Democracy Spraffa

Agenda Document Pack - Planning Committee - 04/03/2025

South Lanarkshire Council · 4 March 2025
Back to Planning Committee — 4 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 24 February 2025 
Dear Councillor 
Planning Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 04 March 2025
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Richard Nelson (Chair), Gerry Convery (Depute Chair), Joe Fagan (ex officio), Alex Allison, Ralph
Barker, Archie Buchanan, Ross Clark, Margaret Cowie, Maureen Devlin, Colin Dewar, Mary
Donnelly, Alistair Fulton, Celine Handibode, Graeme Horne, Cal Johnston-Dempsey, Ross Lambie,
Martin Lennon, Lesley McDonald, Davie McLachlan, Norman Rae, John Ross, Graham Scott, David
Shearer, Helen Toner, David Watson 
Substitutes
Walter Brogan, Robert Brown, Mathew Buchanan, Margaret Cooper, Poppy Corbett, Allan Falconer,
Grant Ferguson, Gladys Ferguson-Miller, Martin Hose, Julia Marrs, Ian McAllan, Kenny McCreary,
Bert Thomson
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Planning Committee held on 4 February 2025
submitted for approval as a correct record.  (Copy attached) 
5 - 12 
Item(s) for Decision 
3 Application P/24/0260 for Mixed Use Development Including Residential,
Hotel and Commercial Uses, Demolition and Ancillary Works (Planning
Permission in Principle) at Shawfield Stadium, Rutherglen Road,
Rutherglen
Report dated 24 February 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
13 - 32 
4 Application P/24/0332 for Erection of House with Associated Landscaping
and Access Arrangements at New Steadings Farm, Green Towers Road,
Lanark
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
33 - 42 
5 Application P/24/1069 for Formation of Fishing Ponds and Associated
Facilities (Section 42 Application to Vary the Terms of Condition 21 of
Planning Consent P/19/1807 to Allow Continued Operations at the Site for
a Further 10 Year Period) at Woodend Farm, Carnwath, Lanark
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
43 - 54 
6 Application P/24/1185 for Erection of Single Storey House and Relocation
of Existing Stables at Knowehead Farm, Blackburnmill Highway,
Strathaven
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
55 - 62 
7 Application P/24/1282 for Section 42 Application to Vary Condition 18 of
Planning Consent P/21/1100 to Amend Position of Substation Associated
with Wind Turbine at Land at West Dykes, Muirkirk Road, Strathaven
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
63 - 74 
8 Application P/24/1373 for Erection of House at Newark Farm, Land 135
Metres Northwest of Newark Mill, Whitecraigs Highway, Glassford,
Strathaven
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
75 - 82 
9 Application P/24/1421 for Erection of 6 2-Storey Houses (2 Terraced
Blocks) and a 3-Storey Block of 18 Flats with Associated Parking,
Landscaping and Associated Services at Land Enclosed by High Blantyre
Road, Glenlee Street and Reid Street, Hamilton
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
83 - 94
2

Page 3

10  Application P/24/1423 for Erection of 2 3-Storey Blocks of Flats (24 Units)
with Associated Parking, Landscaping and Associated Services at Land at
Backmuir Road, Hamilton
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
95 - 106 
11  Application P/24/1465 for Erection of Single Storey House with Attic
Space, Associated Garage/Studio Space and Formation of New Driveway
at Land 82 Metres Northwest of 148 Lanark Road, Crossford, Carluke
Report dated 24 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
107 - 114 
Urgent Business 
12  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

PLANNING COMMITTEE 
Minutes of meeting held via Confero and the Council Chamber, Council Offices, Almada Street,
Hamilton on 4 February 2025 
Chair:
Councillor Richard Nelson 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Archie Buchanan, Councillor Ross
Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cowie, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Mary Donnelly, Councillor Alistair Fulton, Councillor Celine
Handibode, Councillor Graeme Horne, Councillor Cal Johnston-Dempsey, Councillor Ross Lambie,
Councillor Lesley McDonald, Councillor Davie McLachlan, Councillor Norman Rae, Councillor John
Ross, Councillor Graham Scott, Councillor David Shearer, Councillor Helen Toner, Councillor David
Watson 
Councillors' Apologies:
Councillor Joe Fagan (ex officio), Councillor Martin Lennon 
Attending:
Community and Enterprise Resources
F Carlin, Head of Planning and Regulatory Services; B Darroch, Planning Area Manager (East
Team); F Jack, Team Leader, Development Management Team, Roads, Transportation and Fleet
Services; D Russell, Planning Area Manager (West Team)
Finance and Corporate Resources
L Hamilton, Administration Officer; S Jessup, Administration Assistant; S McLeod, Administration
Officer 
Order of Business
The Committee decided:  that the items of business be dealt with in the order
minuted below. 
1 Declaration of Interests  
Councillor(s)
Shearer 
Item(s)
Application P/23/0619 for installation of
air source heat pump (retrospective) at
Plot 23, Waterlands Road, Law, Carluke
Nature of Interest(s)
Prior involvement in
application
Shearer  Application P/23/1183 for installation of
air source heat pump to side of house
(retrospective) at Plot 29, Waterlands
Road, Law, Carluke 
Prior involvement in
application 
Donnelly  Application P/24/1038 for change of use
of after school care facility (class 10) to
retail (class 1A) and associated
alterations at 20 Argyle Drive, Hamilton 
Prior discussion with
constituents 
2
5

Page 6

2 Minutes of Previous Meeting 
The minutes of the meeting of the Planning Committee held on 3 December 2024 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Application P/23/0619 for Installation of Air Source Heat Pump (Retrospective) at
Plot 23, Waterlands Road, Law, Carluke 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0619 by T Smith for the installation of
an air source heat pump (retrospective) at Plot 23, Waterlands Road, Law, Carluke. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/23/0619 by T Smith for the
installation of an air source heat pump (retrospective) at
Plot 23, Waterlands Road, Law, Carluke be granted. 
Councillor Shearer, having declared an interest in this item, withdrew from the meeting during its
consideration 
Councillor Horne joined the meeting during consideration of this item of business 
4 Application P/23/1183 for Installation of Air Source Heat Pump to Side of House
(Retrospective) at Plot 29, Waterlands Road, Law, Carluke 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/1183 by J Gilhaney for the installation
of an air source heat pump to the side of the house (retrospective) at Plot 29, Waterlands Road,
Law, Carluke. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/23/1183 by J Gilhaney for the
installation of an air source heat pump to the side of the
house (retrospective) at Plot 29, Waterlands Road, Law,
Carluke be granted. 
Councillor Shearer, having declared an interest in this item, withdrew from the meeting during its
consideration 
5 Application P/23/0927 for Installation of 9.8 Megawatt (MW) Battery Storage
Facility and Associated Infrastructure at Land 290 Metres North Northwest of 3
Leadhills Road, Elvanfoot, Biggar 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0927 by Muirhall Energy Limited for the
installation of a 9.8 megawatt (MW) battery storage facility and associated infrastructure at land
290 metres north northwest of 3 Leadhills Road, Elvanfoot, Biggar.
6

Page 7

Following discussion, during which an officer responded to members’ questions on various
aspects of the report, Councillor Nelson, seconded by Councillor Convery, moved that the
application be granted subject to the conditions specified in the Executive Director’s report. 
Councillor Barker, seconded by Councillor Shearer, moved that the application be refused on
the grounds that the application site was 50 metres from the nearest residential property which
was too close.  On a vote being taken using the electronic voting system, 9 members voted for
the amendment and 14 for the motion which was declared carried. 
The Committee decided: that planning application P/23/0927 by Muirhall Energy
Limited for the installation of a 9.8 megawatt (MW) battery
storage facility and associated infrastructure at land 290
metres north northwest of 3 Leadhills Road, Elvanfoot,
Biggar be granted subject to the conditions specified in the
Executive Director’s report. 
6 Application P/23/1581 for Mixed Use Development, Including Residential,
Community Facilities, Open Space, Distributor Road, Primary School and
Neighbourhood Retail Centre (Approval of Matters Specified in Condition 2 of
Planning Consent CR/15/0007 (which varied CR/09/0139) to Facilitate the Erection
of 206 Residential Dwellings and Associated Works and Discharge of the
Remaining Condition of Associated Planning Permission in Principle) at Newton
Farm POD 2F, Harvester Avenue, Cambuslang 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/1581 by Taylor Wimpey West Scotland
for a mixed use development, including residential, community facilities, open space, distributor
road, primary school and neighbourhood retail centre (approval of matters specified in condition
2 of planning consent CR/15/0007 (which varied planning consent CR/09/0139) to facilitate the
erection of 206 residential dwellings and associated works and discharge of the remaining
condition of associated planning permission in principle) at Newton Farm POD 2F, Harvester
Avenue, Cambuslang. 
The Committee decided: that planning application P/23/1581 by Taylor Wimpey
West Scotland for a mixed use development, including
residential, community facilities, open space, distributor
road, primary school and neighbourhood retail centre
(approval of matters specified in condition 2 of planning
consent CR/15/0007 (which varied planning consent
CR/09/0139) to facilitate the erection of 206 residential
dwellings and associated works and discharge of condition
2 (a-h) of planning consent CR/15/0007) at Newton Farm
POD 2F, Harvester Avenue, Cambuslang be granted. 
[Reference:  Minutes of 24 March 2015 (Paragraph 18)] 
7 Application P/23/1613 for Installation of a 49.9 Megawatt (MW) Battery Energy
Storage Facility (BESS) with Associated Infrastructure at Sheriffaulds Farm,
Muttonhole Road, Hamilton 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/1613 by Big Battery (Sheriff Faulds
Farm 1) Limited for the installation of a 49.9 megawatt (MW) battery energy storage facility
(BESS) with associated infrastructure at Sheriffaulds Farm, Muttonhole Road, Hamilton.
7

Page 8

There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/23/1613 by Big Battery (Sheriff
Faulds Farm 1) Limited for the installation of a 49.9
megawatt (MW) battery energy storage facility (BESS) with
associated infrastructure at Sheriffaulds Farm, Muttonhole
Road, Hamilton be granted subject to the conditions
specified in the Executive Director’s report. 
8 Application P/24/0808 for Erection of 6 Dwelling Flats and Associated
Infrastructure at Land 50 Metres South of 1A Wilkie Road, Wilkie Road,
Uddingston 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/24/0808 by W&D Investments for the
erection of 6 dwelling flats and associated infrastructure at land 50 metres south of 1A Wilkie
Road, Wilkie Road, Uddingston. 
There followed a discussion on the application during which an officer responded to a member’s
question on an aspect of the report. 
The Committee decided: that planning application P/24/0808 by W&D Investments
for the erection of 6 dwelling flats and associated
infrastructure at land 50 metres south of 1A Wilkie Road,
Wilkie Road, Uddingston be granted subject to the
conditions specified in the Executive Director’s report. 
9 Application P/24/1038 for Change of Use of After School Care Facility (Class 10) to
Retail (Class 1A) and Associated Alterations at 20 Argyle Drive, Hamilton 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/24/1038 by IA Real Estate Limited for the
change of use of an after-school care facility (class 10) to retail (class 1A) and associated
alterations at 20 Argyle Drive, Hamilton. 
There followed a discussion on the application during which an officer responded to a member’s
question on an aspect of the report. 
The Committee decided: that planning application P/24/1038 by IA Real Estate
Limited for the change of use of an after-school care facility
(class 10) to retail (class 1A) and associated alterations at
20 Argyle Drive, Hamilton be refused for the reasons
detailed in the Executive Director’s report. 
[Reference:  Minutes of 22 November 2022 (Paragraph 3)] 
Councillor Donnelly, having declared an interest in this item, withdrew from the meeting during its
consideration
8

Page 9

10 Application P/24/1149 for Installation of 33 Kilovolt (kV) Underground Electrical
Cable (4.5km in Length) Supplementing Consented Overhead Lines, Electrical
Kiosk, Associated Ancillary Infrastructure and Access to Connect Priestgill Wind
Farm to Elvanfoot Substation at Development Location Spanning from Littlegill
Farm to Elvanfoot Substation Via Abington and Leadhills 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/24/1149 by Priestgill Wind Farm Limited for
the installation of a 33 kilovolt (kV) underground electrical cable (4.5km in length) supplementing
consented overhead lines, electrical kiosk, associated ancillary infrastructure and access to
connect Priestgill Wind Farm to Elvanfoot Substation at Development Location spanning from
Littlegill Farm to Elvanfoot substation via Abington and Leadhills. 
There followed a discussion on the application during which officers responded to members’
questions on aspects of the report. 
The Chair asked that it be noted that the public road through Abington should be reinstated to
an appropriate standard following completion of works and called upon the developer to
maintain regular contact with local elected members in terms of arrangements to minimise
disruption to the local community. 
The Committee decided: that planning application P/24/1149 by Priestgill Wind Farm
Limited for the installation of a 33 kilovolt (kV) underground
electrical cable (4.5km in length) supplementing consented
overhead lines, electrical kiosk, associated ancillary
infrastructure and access to connect Priestgill Wind Farm
to Elvanfoot Substation at Development Location spanning
from Littlegill Farm to Elvanfoot substation via Abington
and Leadhills be granted subject to the conditions specified
in the Executive Director’s report.   
[Reference:  Minutes of 1 December 2020 (Paragraph 9)] 
11 Application P/24/1171 for Demolition of Detached Garage, Alterations/Land
Engineering Operations Including Retaining Walls and Erection of 4 Bedroom
Detached House at 24 Covanburn Avenue, Hamilton 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/24/1171 by G Ferguson for the demolition
of a detached garage, alterations/land engineering operations including retaining walls and
erection of a 4-bedroom detached house at 24 Covanburn Avenue, Hamilton. 
There followed a discussion on the application during which an officer responded to a member’s
question on an aspect of the report. 
The Committee decided: that planning application P/24/1171 by G Ferguson for the
demolition of a detached garage, alterations/land
engineering operations including retaining walls and
erection of a 4-bedroom detached house at 24 Covanburn
Avenue, Hamilton be granted subject to the conditions
specified in the Executive Director’s report.
9

Page 10

12 Application P/24/1184 for Part Change of Office Building (Class 4) to Veterinary
Surgery (Class 1A) on Entirety of Ground Floor and Mix of Business Use and
Veterinary Surgery on First Floor at 1 Biggar Business Park, Market Road, Biggar 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/24/1184 by Armac Vets Limited for a part
change of use of an office building (class 4) to a veterinary surgery (class 1A) on the entirety of
the ground floor and a mix of business use and a veterinary surgery on the first floor at 1 Biggar
Business Park, Market Road, Biggar. 
There followed a discussion on the application during which an officer responded to a member’s
question on an aspect of the report. 
The Committee decided: that planning application P/24/1184 by Armac Vets Limited
for a part change of use of an office building (class 4) to a
veterinary surgery (class 1A) on the entirety of the ground
floor and a mix of business use and a veterinary surgery on
the first floor at 1 Biggar Business Park, Market Road,
Biggar be granted subject to the conditions specified in the
Executive Director’s report. 
13 Application P/24/1379 for Residential Development Comprising 105 Dwellings,
MUGA, Landscaping and Associated Infrastructure (Section 42 Application to
Vary Condition 15 of Planning Consent P/22/0056 to Facilitate Alterations to the
Approved Landscaping Scheme) at Land 115 Metres Northwest of 52 Rickard
Avenue, Strathaven 
A report dated 27 January 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/24/1379 by Bancon Homes and Paterson
Partners for a residential development comprising of 105 dwellings, MUGA, landscaping and
associated infrastructure (section 42 application to vary condition 15 of planning consent
P/22/0056 to facilitate alterations to the approved landscaping scheme) at land 115 metres
northwest of 52 Rickard Avenue, Strathaven. 
At its meeting on 7 July 2015, the Committee had approved a procedure for processing planning
applications which required completion of a Legal Agreement.  If approved, the application
would be subject to a Legal Agreement and/or other appropriate mechanism and the approved
procedure would apply. 
The Committee decided: that planning application P/24/1379 by Bancon Homes and
Paterson Partners for a residential development comprising
of 105 dwellings, MUGA, landscaping and associated
infrastructure (section 42 application to vary condition 15 of
planning consent P/22/0056 to facilitate alterations to the
approved landscaping scheme) at land 115 metres
northwest of 52 Rickard Avenue, Strathaven be granted
subject to:- 
 the conditions specified in the Executive Director’s
report
 the conclusion of an amended version of the Section
75 Agreement, between the Council, site owner(s)
and the applicant, in respect of planning consent
EK/12/0003 
[Reference:  Minutes of 7 July 2015 (Paragraph 15) and 29 March 2022 (Paragraph 15)]
10

Page 11

14 Urgent Business 
There were no items of urgent business. 
11

Page 12

12

Page 13

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0260
Proposal:  Mixed use development including residential, hotel and commercial
uses, demolition and ancillary works (Planning Permission in Principle) 
Site Address:  Shawfield Stadium
Rutherglen Road
Rutherglen 
Applicant:  Shawfield Regeneration Ltd 
Agent:  Ryden
Ward:  12 – Rutherglen Central and North
Application Type:  Planning Permission in Principle
Advert Date:  Rutherglen Reformer
20 March 2024
Development Plan
Compliance:
No 
Departures:  Yes
Recommendation:  Grant (subject to conditions and the conclusion of a Section 75 legal
agreement)
Legal Agreement:  The Planning Committee is also advised that approval should be
subject to the conclusion of a legal agreement(s) covering:- 
1. Education Contribution Payments 
2. Community Contribution Payments
3. On-site Affordable Housing Provision 
The applicant will be responsible for meeting the Council’s reasonably
incurred legal expenses in respect of the legal agreement. 
Direction to
Scottish Ministers 
N/A 
3
13

Page 14

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a National
Development under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the Scheme of Delegation requires that all National
Developments are determined by the Planning Committee. 
1.2. The Committee is advised that, in accordance with regulations associated with
National Developments, a hearing was offered to the applicants and all representees
in respect of the proposal.  However, as none of those contacted elected to accept the
offer of a hearing, a pre-determination hearing is not required. 
2. Site Description
2.1. The site, which measures approximately 4.72 hectares in area, is located on
Rutherglen Road with Shawfield Drive to the east and a commercial unit to the south
currently in use as a tile showroom. 
2.2. The site currently comprises the former stadium, which has fallen into a state of
disrepair.  A car parking area is located to the south-west of the site adjacent to
Rutherglen Road, while there is an elevated area of unmaintained ground located at
the north of the site.  While the former playing field within the stadium is flat, the site’s
overall natural landform slopes up from a low point on the south-east of the site
towards the north and the River Clyde. 
3. Description of Proposed Development
3.1 Planning Permission in Principle is sought for the redevelopment of the site for a mixed
use development including residential, hotel and commercial uses, including
demolition and ancillary works.  All existing structures within the site would be removed
to facilitate the proposed redevelopment. 
3.2. As the application is for Planning Permission in Principle detailed plans do not require
to be submitted at this stage.  However, sufficient design detail has been provided to
address technical matters upfront, including site access, drainage strategy and ground
conditions, while an indicative design layout has also been provided to seek to
establish site capacity in terms of scale, mass and density.  In this regard the proposals
seek permission for the development of the site for the following:- 
 circa 450 residential units, largely expected to be flatted in a variety of sizes
and tenures
 circa 150 bedroom hotel with associated ground floor amenities
 provision of circa 700sqm of ground floor commercial space to accommodate
local facilities.  Such facilities could include Class 1A retail and commercial,
office space, Class 3 food and drink/sui generis and Class 11 assembly and
leisure uses 
4. Relevant Planning History
4.1. Shawfield Stadium formed part of the Shawfield Masterplan area approved under
Planning Permission in Principle consent CR/12/0099 in December 2012.  Within the
overall masterplan the stadium site was designated as office and leisure space. 
4.2. A Proposal of Application Notice (PAN) for the proposed development was submitted
in October 2023 (P/23/0020/PAN) with details provided of multiple pre-application
public consultation events, and confirmation that details of the proposal would be sent
to local elected members and other representatives and groups as appropriate.  
14

Page 15

5. Supporting Information 
5.1.  Several supporting documents have been submitted in support of this application
including:- 
- Planning Statement
- Design and Access Statement
- Pre-Application Consultation Report
- Transport Assessment
- Tree Survey Report
- Statement of Energy
- Phase 1 Contamination Study
- Flood Risk Assessment 
- Drainage Impact Assessment
- Heritage Assessment
- Preliminary Ecological Appraisal
- Archaeological Assessment 
6. Consultations
6.1. Environmental Services – No objections subject to the inclusion of conditions relating
to noise, waste, dust, air quality and contamination issues.
Response: Noted.  These matters could be addressed through conditions and on the
decision notice if the application were to be approved. 
6.2. Roads, Transportation and Fleet Services (Development Management) – No
objections subject to the inclusion of conditions relating to car parking, servicing,
sustainable transport and traffic management issues.
Response: Noted.  These matters could be addressed through conditions and on the
decision notice if the application were to be approved. 
6.3. Roads, Transportation and Fleet Services (Flood Risk Management) – No
objections subject to the inclusion of a condition relating to flooding and drainage
issues.
Response: Noted.  These matters could be addressed through conditions and on the
decision notice if the application were to be approved. 
6.4. Education Resources – No objections subject to the provision of appropriate
education contributions by the developer to ensure the provision of nursery, primary
and secondary education capacity to serve the development. 
Response: Noted.  These matters would be addressed through a legal agreement
forming part of any consent to be issued. 
6.5. Housing Services – No objections subject to the Council’s affordable housing
requirement of 25% being provided as part of the development. 
Response: Noted.  This matter could be addressed through a condition and on the
decision notice if the application were to be approved. 
6.6. West of Scotland Archaeology Service - No objections subject to the inclusion of a
condition relating to archaeological matters.
Response: Noted.  These matters could be addressed through conditions and on the
decision notice if the application were to be approved. 
6.7. Scottish Water – offered no objections to the proposed development.
Response: Noted. 
15

Page 16

6.8. SEPA - No objections subject to the inclusion of a condition relating to flooding and
drainage issues.
Response: Noted.  This matter could be addressed through a condition and on the
decision notice if the application were to be approved. 
6.9. Historic Environment Scotland – offered no objections to the proposed
development.
Response: Noted. 
6.10. SP Energy Networks – have not responded to date. 
6.11. Transport Scotland – No objections subject to the inclusion of a condition relating to
sustainable transport matters.
Response: Noted.  This matter could be addressed through a condition and on the
decision notice if the application were to be approved. 
6.12. Glasgow City Council – No response. 
6.13.  Scotland Gas Networks – offered no objections to the proposed development.
Response: Noted. 
6.14.  SportScotland – offered no objections to the proposed development.
Response: Noted. 
6.15. SPT – No objections subject to the inclusion of a condition relating to bus stop
provision.
Response: Noted.  This matter could be addressed through a condition and on the
decision notice if the application were to be approved. 
6.16. Glasgow Airport – No objections subject to the inclusion of a condition requiring the
airport to be further consulted in the event that any element of the future detailed
design exceeded 90 metres in height.
Response: Noted.  The airport would be further consulted as a matter of course in the
event that such a development was proposed. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
three objections and three letters of support have been received.  The issues raised
are summarised as follows:- 
 Traffic
 Parking provision 
 Flooding
 Amenity provision
 Scale of development
 Pollution 
The above issues are considered in the assessment below.  These letters are
available for inspection on the planning portal.  Other non-material issues were also
raised, however, these are not planning related and do not form part of the assessment
of the proposal.  
16

Page 17

8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 3 - Biodiversity 
 Policy 7 - Historic assets and places 
 Policy 9 - Brownfield, vacant and derelict land and empty buildings 
 Policy 13 - Sustainable transport 
 Policy 14 - Design, quality and place 
 Policy 15 - Local Living and 20 minute neighbourhoods 
 Policy 16 - Quality homes 
 Policy 22 - Flood risk and water management 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies 
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change 
 Policy 5 - Development Management and Placemaking 
 Policy 7 - Community Infrastructure Assessment 
 Policy 8 - Employment 
 Policy 11 - Housing 
 Policy 12 - Affordable Housing 
 Policy 13 - Green Network and Greenspace 
 Policy 14 - Natural and Historic Environment 
 Policy 15 - Travel and Transport 
 Policy 16 - Water Environment and Flooding 
SLLDP2 Volume 2 Policies 
 Policy DM1 - New Development Design 
 Policy ICD1 - Strategic Economic Investment Locations 
 Policy NHE9 - Protected Species 
 Policy NHE20 - Biodiversity 
 Policy SDCC1 - Vacant, Derelict and Contaminated Land 
 Policy SDCC2 - Flood Risk 
 Policy SDCC3 - Sustainable Drainage Systems 
17

Page 18

9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
The main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development and an assessment of technical
matters.  The policies contained within National Planning Framework 4 and the South
Lanarkshire Local Development Plan 2 are the main consideration in this case,
together with an assessment of any other material planning considerations. 
10.2. Principle of Development
In terms of land use designation, the site is located within the Shawfield SEIL (Strategic
Economic Investment Location) as designated by Policy 8 – Employment and Policy
ICD1 – Strategic Economic Investment Locations of the South Lanarkshire Local
Development Plan 2.  The site is also located within the wider Clyde Gateway
Development Framework site as designated by Policy 1 – Spatial Strategy. 
10.3. The previous Planning Permission in Principle consent for the wider site (Planning Ref:
CR/12/0099) designated the stadium site as office and leisure space.  As such, the
previous consent included a non-strategic economic land use in the form of leisure
space.  The current proposal would result in the site being almost entirely removed
from business use, with residential, hotel and commercial uses, to include up to 700
square metres of ground floor retail, commercial, food and drink/sui generis and
gym/leisure uses, though an element of office space provision may be retained.  As
such, the proposed development would not fully conform to the provisions of Policies
8 or ICD1 of the adopted Local Development Plan, as these policies generally require
business and industry land, in particular SEILs, to be retained for employment land
uses. 
10.4. With regard to the other provisions of NPF4, Policy 14 – Design, Quality and Place
seeks to encourage, promote and facilitate well designed development that makes
successful places. Policy 15 – Local Living and 20 minute neighbourhoods seeks to
encourage, promote and facilitate the application of the Place Principle and create
connected and compact neighbourhoods where people can meet the majority of their
daily needs within a reasonable distance of their home, preferably by walking,
wheeling or cycling or using sustainable transport options.  In this case, while the site
is not currently designated for residential use, it is located at the north-western edge
of the Clyde Gateway Development Framework site, on the boundary of South
Lanarkshire Council and Glasgow City Council. 
10.5. The site is in close proximity to both Richmond Park and existing residential
developments at Oatlands and Bridgeton.  It is therefore well connected to existing
neighbourhoods and green spaces and is considered to have the scope to provide a
development that facilitates the aims of Policies 14 and 15.
10.6. Policy 16 – Quality homes seeks to encourage, promote and facilitate the delivery of
more high quality, affordable and sustainable homes, in the right locations, providing
choice across tenures that meets the diverse housing needs of people and
communities across Scotland.  SLLDP2 Policy 11 - Housing and Policy 12 – Affordable
Housing require that developers provide a range of house sizes and types to give
greater choice in meeting the needs of the local community, with Policy 12 specifically
requiring the Council’s affordable housing requirements to be met as part of proposed
developments.  It is considered that this proposed development has the potential to
provide up to 450 residential dwellings in a sustainable location, while also making
18

Page 19

appropriate on-site provisions in respect of affordable housing.  As such, the proposals
are considered to meet the aims of Policy 16 of NPF4 and Policies 11 and 12 of
SLLDP2. 
10.7. Policy 9 – Brownfield, vacant and derelict land and empty buildings of NPF4 seeks to
encourage, promote and facilitate the reuse of brownfield, vacant and derelict land
and empty buildings, and to help reduce the need for greenfield development.  Policy
SDCC1 – Vacant, Derelict and Contaminated Land of the South Lanarkshire Local
Development Plan 2 reinforces this position, with a specific emphasis on implementing
delivery on brownfield land in the Clyde Gateway urban regeneration company (URC)
area. 
10.8. Shawfield Stadium currently lies unused and has fallen into a state of disrepair.  The
proposals therefore provide the opportunity for this redundant and derelict site to be
brought back into an appropriate use and, as such, the proposals are considered to
be fully compliant with the provisions of Policy 9 of NPF4 and Policy SDCC1 of
SLLDP2. 
10.9. Policy 7 – Historic Assets and Places of NPF4 seeks to protect and enhance historic
environment assets and places, and to enable positive change as a catalyst for the
regeneration of places.  This position is also reflected in Policy 14 – Natural and
Historic Environment of the South Lanarkshire Local Development Plan 2.  Given that
the site is not subject to any statutory listing or designation in respect of historic assets
the proposed redevelopment of the site does not raise any issues in the context of
Policy 7 of NPF4 or Policy 14 of SLLDP2. 
10.10. Policy 22 – Flood risk and water management of NPF4 seeks to strengthen resilience
to flood risk by promoting avoidance as a first principle and reducing the vulnerability
of existing and future development to flooding.  Similar policy is provided in Policies
16 – Water Environment and Flooding, SDCC2 – Flood Risk and SDCC3 –
Sustainable drainage systems of the South Lanarkshire Local Development Plan 2. 
In this case detailed consultation has been undertaken both with SEPA and the
Council’s Roads and Transportation (Flood Risk Management) Service with regard to
the principle of the proposed redevelopment of the site as brought forward by the
applicants in respect of flood risk and drainage matters. 
10.11. Both SEPA and the Council’s Roads and Transportation (Flood Risk Management)
Service have advised that they are satisfied that sufficient information has been
provided to allow them to support the principle of the redevelopment of the site as
proposed.  However, both have noted that further detailed information would require
to be provided as part of any future Approval of Matters Specified in Conditions
(AMSiC) application submitted to the Council in respect of the site.  Subject to
conditions addressing these requirements it is considered that the proposals comply
with the provisions of Policy 22 of NPF4 and Policies 16, SDCC2 and SDCC3 of
SLLDP2. 
10.12. Policy 13 – Sustainable Transport of NPF4 seeks to encourage, promote and facilitate
developments that prioritise walking, wheeling, cycling and public transport for
everyday travel and reduce the need to travel unsustainably.  In this case, it is noted
that the application site is located within a developed urban area and in close proximity
to public transport links including bus services on Rutherglen Road, directly adjacent
to the site, and nearby railway stations.  The Clyde Walkway and cycle route is also
located in close proximity to the site.  Additionally, both Transport Scotland and SPT
have confirmed their support of the application, subject to conditions relating to travel
and transport considerations that would be attached to any consent issued.  The
19

Page 20

proposals are therefore considered to be compliant in principle with Policy 13 in this
case.
10.13. Policies 5 – Development Management and Placemaking and DM1 – New
Development Design of the South Lanarkshire Local Development Plan 2 seek to
ensure that proposals are appropriately designed, take account of the principles of
sustainable development, appropriately integrate with the local area and do not raise
any significant amenity issues.  Policy 15 – Travel and Transport of the adopted local
development plan requires to ensure that the impact of all new development on the
public road network is accounted for as part of all development proposals brought
forward. 
10.14. In this case the principles in respect of the design and layout of the proposed
development as brought forward have been considered and the principle of the
proposed scale of development is appropriate in respect of the application site.  Details
of the actual development of the site will however be assessed in subsequent
applications which would follow the issue of consent on this application. 
10.15. Consultation has been undertaken with the Council’s Environmental Services in
respect of contamination issues in the area and within the site itself.  The Service has
confirmed that sufficient information has been provided in respect of the principle of
the development of the site for residential use.  Further specific detail with regard to
contamination matters would require to be provided as part of any future AMSiC
application in respect of the site and any Planning Permission in Principle granted at
this stage would be appropriately conditioned in this regard. 
10.16. Similarly, consultation has been undertaken with the Councils Roads, Transportation
and Fleet Services in respect of traffic, transport, parking and other road safety
considerations associated with the proposals.  Again, subject to conditions that would
be attached to any consent issued, including the provision of an updated Transport
Assessment as part of any future AMSiC application in respect of the site, the Service
has confirmed their satisfaction with the principle of the proposed land uses in this
case.  Overall, following a detailed assessment of the proposals brought forward, it
has been concluded that the proposals are fully compliant with the provisions of
Policies 5, 15 and DM1 of the SLLDP2 and with the Council’s Residential Design
Guide. 
10.17. Policy 13 – Green Network and Greenspace of the South Lanarkshire Local
Development Plan 2 states that development proposals should safeguard the green
network, as identified on the proposals map, and identify opportunities for
enhancement and/or extension as appropriate.  In this case the site is located within
the Green Network designated across the wider Clyde Gateway Development
Framework Site.  However, there are no specific implications relating to the Green
Network resulting from this proposed development.  Indeed, the proposals create the
opportunity to provide enhanced Green Network linkages as part of any future detailed
design brought forward.  As such, the proposals do not raise any concerns in respect
of Policy 13. 
10.18. Policy 7 – Community Infrastructure Assessment of the South Lanarkshire Local
Development Plan 2 states that, in cases where development proposals would require
capital or other works or facilities to enable the development to proceed, financial
contributions towards their implementation will be required.  In this case contributions
in respect of appropriate education and community facility provision would be sought
as part of a Section 75 legal agreement forming part of any consent granted in respect
20

Page 21

of the site.  Through this process the requirements of Policy 7 would be fully adhered
to in respect of the proposed site redevelopment works. 
10.19. Climate Change
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of
climate change.  NPF4 Policy 3 states that development proposals will contribute to
the enhancement of biodiversity, and proposals for national or major development will
only be supported where it can be demonstrated that the proposal will conserve,
restore and enhance biodiversity.  This position is similarly set out in Policies NHE9 –
Protected Species and NHE20 – Biodiversity of the South Lanarkshire Local
Development Plan 2.  In this case it has been demonstrated to the satisfaction of the
Planning Service that the development would not adversely impact on biodiversity
interests and there are no specific concerns with regard to climate change issues
associated with the proposal in this instance.  As such, the proposals are considered
to comply with the relevant provisions of Policies 1, 2 and 3 of NPF4 and Policies 2,
NHE9 and NHE20 of SLLDP2. 
10.20. Layout, Siting and Design
In this instance, as the application is for Planning Permission in Principle, detailed
plans do not require to be submitted at this stage.  However, sufficient design detail
has been provided to address technical matters upfront, including site access,
drainage strategy and ground conditions, while an indicative design layout has also
been provided to seek to establish site capacity in terms of scale, mass and density. 
While there is no requirement for any future detailed plans brought forward as part of
a subsequent AMSiC application to adhere to the indicative design details presented
in this case, it is considered that it has been satisfactorily demonstrated that the site
can accommodate the scale of development proposed, subject to appropriate detailed
plans being brought forward in due course through an AMSiC application to the
Council. 
10.21. Conclusion
Following a detailed assessment of the application, it is recognised that the proposals
do not fully comply with the provisions of the South Lanarkshire Local Development
Plan 2 (adopted 2021), in respect of Policies 8 and ICD1, as they relate to the provision
of non-employment uses, including residential development, within an area
designated as a Strategic Economic Investment Location within the plan.  The
application has therefore been advertised in the local press as Development Contrary
to the Development Plan on this basis.  However, following a detailed assessment of
the proposed development, it is considered appropriate for Planning Permission in
Principle to be granted, contrary to the adopted development plan, for the following
reasons:- 
(i) The proposals would allow the provision of a mixed use development, to include
residential development, on a brownfield site within the urban area;
(ii) The proposals would allow a vacant, redundant site to be redeveloped to an
appropriate use;
(iii) The proposals can be developed in a manner that would not adversely impact
on the amenity of existing or future residents of the area;
(iv) The proposals fully comply with the provisions of National Planning Framework
4 (2023), with particular regard to sustainability and brownfield land
considerations;
(v) The proposals comply with the provisions of Policies 1, 2, 5, 7, 11, 12, 13, 14,
15 and 16 of the South Lanarkshire Local Development Plan 2 (adopted 2021).
21

Page 22

11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Planning Permission in Principle subject to the following conditions and
a Section 75 Legal Agreement:- 
01. Details of the specified matters listed below shall be submitted for consideration by the
Planning Authority, in accordance with the timescales and other limitations in section
59 of the Town and Country Planning (Scotland) Act 1997 (as amended).  No
development shall begin on the site unless all of the details listed in this condition have
been submitted to and approved in writing by the Planning Authority for each identified
phase of development.  Thereafter the development shall be carried out in complete
accordance with the details approved in relation to this condition.   
Specified matters:- 
(a)  Full details of the layout, siting, design, external appearance and finishing
materials of the proposed development;
(b)  Full details of the proposed means of access to the development including
visibility splays and vehicle lay-by at the junction with the public road;
(c)  A landscaping scheme for the development including details of the existing
landscape features and vegetation to be retained; the locations of new trees,
shrubs, hedges and grassed areas; a schedule of plants including species,
plant sizes and proposed numbers and density; the layout, design and materials
of all hard landscaping works including walls, fences and gates; and a
programme for the completion and subsequent maintenance of the proposed
landscaping;
(d)  A detailed levels survey of the site and cross sections showing proposed
finished ground and floor levels relative to existing ground levels and a fixed
ordnance datum point;
(e)  Full details of the proposed means of disposal of foul and surface water from
the development;
(f)  Full details of the provision of street furniture, public realm and public art within
the proposed development;
(g)  Full details of the provisions in respect of biodiversity, species protection and
habitat management within the site, including the submission of an up-to-date
protected species survey in respect of the site;
(h)  Full details of the provisions in respect of contamination and remediation
measures/works associated with the proposed development;
(i)  A scheme for the control and mitigation of dust that shall thereafter be
implemented in accordance with a programme to be agreed in writing with the
Council as Planning Authority;
(j)  A comprehensive materials management plan detailing how excavation
arisings will be characterised and managed including any testing; proposals for
re-use and disposal; and proposals for managing contamination risks including
to members of the public and the Water Environment.  Upon completion of
works, evidence of materials management plan aspects, such as testing data,
photographs, disposal record etc shall be submitted to and approved in writing
by the Planning Authority;
(k)  A noise assessment to determine the impact of road traffic noise on the
proposed development using the principles set out in "Calculation of Road
22

Page 23

Traffic Noise" (DoT/Welsh Office, HMSO, 1988) or by a method to be agreed
by the Planning Authority such as the shortened daytime measurement method;
(l)  Full details of the implementation of a scheme in respect of construction noise
within the site; 
(m)  An air quality impact assessment; 
(n)  A waste strategy; 
(o)  A Flood Risk Assessment addendum. 
Reason: Permission for the development has been granted in principle only and
subsequent approval is required for these matters in accordance with Section 59 of
the Town and Country Planning (Scotland) Act 1997 (as amended). 
02. That the first application for the approval of matters specified in the conditions of the
consent hereby approved shall include the submission of the following details for
consideration by the Planning Authority, in accordance with the timescales and other
limitations in section 59 of the Town and Country Planning (Scotland) Act 1997 (as
amended).  No development shall begin on the site unless all of the details listed in
this condition have been submitted to and approved in writing by the Planning
Authority for each identified phase of development.   
Specified Matters:- 
a) Car Parking Strategy 
b) Site Servicing Strategy 
c) Sustainable Transport Strategy 
d) Transport Assessment 
e) Traffic Management Plan 
f) Flooding Strategy 
g) Flood Risk Assessment
h) Drainage Strategy, to include Scottish Water approval or permission to connect
to the public network   
Reason: In the interests of road and public safety. 
03. That the Car Parking Strategy required under the terms of Condition 2 of the consent
hereby approved shall include the provision of the following details to the satisfaction
of the Council as Planning Authority:-   
a) Full details of the parking layout
b) Full details of the provisions in respect of electric vehicle charging (EVC)
facilities 
c) Full details of the provisions in respect of accessible parking 
d) Full details in respect of pedestrian provisions associated with the development 
e) Clarification that no lay-by parking will be incorporated into the development   
Reason: In the interests of road and public safety. 
04. That the Servicing Strategy required under the terms of Condition 2 of the consent
hereby approved shall include the provision of the following details to the satisfaction
of the Council as Planning Authority:- 
23

Page 24

a) Full details of servicing in respect of all commercial units within the site
b) Full details of refuse provisions in respect of all residential and commercial units
within the site
c) Full details to confirm that all servicing will be undertaken within the confines of 
the site   
Reason: In the interests of road and public safety. 
05. That the Sustainable Transport Strategy required under the terms of Condition 2 of the
consent hereby approved shall include measures to address the following matters to
the satisfaction of the Council as Planning Authority:- 
a) Measures to address pedestrian connectivity within and around the site 
b) Measures to provide cycling connectivity within the site which connect and
improve the wider cycle networks in the surrounding area
c) Full details of public transport connections and infrastructure that will be
available and details of how the occupiers and visitors to the site can be
encouraged to utilise these elements
d) Full details of the proposals in respect of any bus stops that require to be
repositioned/relocated to facilitate the development
e) A comprehensive Travel Plan that sets out proposals for reducing dependency
on the private car and identifies measures to be implemented, the system of
management, monitoring, review, reporting and the duration of the plan 
Reason: In the interests of road and public safety. 
06. That the Transport Assessment required under the terms of Condition 2 of the consent
hereby approved shall include the provision of the following details to the satisfaction
of the Council as Planning Authority:-  
a) Full details in respect of junction assessments and improvements associated
with the development
b) Full details in respect of access arrangements associated with the development   
Reason: In the interests of road and public safety. 
07. That the Traffic Management Plan required under the terms of Condition 2 of the
consent hereby approved shall include the provision of the following details to the
satisfaction of the Council as Planning Authority:-   
a) Full details of the route to and from the site of all construction traffic 
b) Full details of car parking for staff and sub-contractors 
c) Full details of drop-off and storage locations for materials 
d) Full details of wheel washing facilities   
Reason: In the interests of road and public safety. 
08. That the Flooding Strategy required under the terms of Condition 2 of the consent
hereby approved shall include the provision of the following details to the satisfaction
of the Council as Planning Authority:-  
a) Full details in respect of safe escape measures from car parking areas during
flooding events
24

Page 25

b) Full details of all mitigation measures in respect of any danger to life during
flooding events   
Reason: In the interests of road and public safety. 
09. That the first application for the approval of matters specified in the conditions of the
consent hereby approved shall include the submission of a Construction Phasing Plan,
which shall detail the timescales for the implementation of all of the measures
submitted as required under Condition 2 above, for the approval of the Planning
Authority.  The development shall thereafter be carried out in accordance with the
details set out in the Construction Phasing Plan, unless otherwise agreed in writing
with the Council as Planning Authority.   
Reason: In the interests of road and public safety. 
10. That the matters specified under the terms of Condition 1 of the consent hereby
approved shall include the provision of the following details to the satisfaction of the
Council as Planning Authority:-  
(a) The applicant shall be required to undertake a comprehensive site
investigation, carried out to the appropriate Phase level, to be submitted to and
approved in writing by, the Council as Planning Authority.  The investigation
shall be completed in accordance with advice given in the following:-  
-   Planning Advice Note 33 (2000) and Part IIA of the Environmental Protection
Act 1990 (as inserted by section 57 of the Environment Act 1995)
-   Land Contamination Risk Management Guidance (LCRM)- issued by DEFRA
and the Environment Agency
-   the latest edition of BS 10175- British Standards institution 'The Investigation
of Potentially Contaminated Sites - Code of Practice'.  
(b)  If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated, and these linkages must be
subjected to risk assessment.  If a Phase 2 investigation is required, then a risk
assessment of all relevant pollution linkages using site specific assessment
criteria will require to be submitted.  
(c)  If the risk assessment identifies any unacceptable risks, a detailed remediation
strategy will be submitted to and approved in writing by the Council as Planning
Authority.  No works other than investigative works shall be carried out on site
prior to receipt of the Council's written approval of the remediation plan.  
If there is a requirement to either re-use site won material or to import material, then
the assessment criteria and sampling frequency that would adequately demonstrate
its suitability for use shall be submitted to and approved by the Planning Authority prior
to any material being used.  In addition to this and in accordance with BS3882:2015
and BS8601:2013, material to be used in the top 300mm shall also be free from
metals, plastic, wood, glass, tarmac, paper and odours.  
25

Page 26

On completion of the works and at a time and or phasing agreed by the Planning
Authority, the developer shall submit a verification report containing details of the
source of the material and appropriate test results to demonstrate its suitability for use.   
Reason: To safeguard the environmental amenity of the area. 
11. That the noise assessment specified under the terms of Condition 1 of the consent
hereby approved shall include the provision of the following details to the satisfaction
of the Council as Planning Authority:-  
The survey shall take cognisance of the Scottish Government Document: Technical
Advice Note Assessment of Noise.  The survey shall be submitted to and approved by
the Planning Authority and where potential noise disturbance is identified, it shall
include a scheme for protecting the proposed dwellings from road traffic noise. 
The scheme shall ensure that the internal levels with windows open (or under
exceptional circumstances closed) do not exceed an LAeq,16hr of 40dB daytime and
an LAeq,8hr of 30dB night-time.  The external levels shall not exceed an LAeq,16hr of
50dB daytime in any rear garden areas, when measured free-field.  The external
amenity level can be raised to an LAeq,16hr of 55dB where it cannot be avoided.  The
approved scheme for the mitigation of noise shall be implemented prior to the
development being brought into use.   
Reason: To safeguard the environmental amenity of the area. 
12. That the scheme in respect of construction noise specified under the terms of
Condition 1 of the consent hereby approved shall include the provision of the following
details to the satisfaction of the Council as Planning Authority:-  
The applicant shall ensure that all works carried out on site are carried out in
accordance with the current BS5228:2009, 'Noise control on construction and open
sites'.  Prior to commencement of construction activities a detailed report identifying
the projected noise impact at the nearest noise sensitive receptors shall be provided
in accordance with the standard.  The imissions at the Noise Sensitive Receptor shall
be cumulative and shall include mobile and stationary plant and equipment.  The noise
from any haul roads on site shall also be included.  Corrections shall be made for
variables such as the operating time and the relative cumulative impact value.  This
shall be corrected for attenuation and shall be provided as an LAeq.1hr to be
compared with either the pre-existing background level or using the ABC table within
the British Standard. 
Reason: To safeguard the environmental amenity of the area. 
13. That the air quality impact assessment specified under the terms of Condition 1 of the
consent hereby approved shall include the provision of the following details to the
satisfaction of the Council as Planning Authority:-  
The air quality impact assessment shall satisfy the Planning Authority that the Local
Air Quality Management Objectives for the pollutants specified in the Air Quality
Regulations, made under Part IV of the Environment Act 1995, will not be exceeded
at (any location in the vicinity of the development where public exposure is relevant)
26

Page 27

AND/OR (residential properties in the vicinity of the development) due to the impacts
of the proposed development and to the increase in traffic associated with the
development.  The survey and report shall use a method based on the principles set
out in the Environmental Protection UK document Development Control: Planning for
Air Quality (2010 Update) and Scottish Government publication "Local Air Quality
Management Technical Guidance LAQM.TG(09)" or a method that has been agreed
with the Planning Authority.   
Reason: To safeguard the environmental amenity of the area. 
14. That the waste strategy specified under the terms of Condition 1 of the consent hereby
approved shall include the provision of the following details to the satisfaction of the
Council as Planning Authority:-  
a) Details for the storage and the collection of commercial waste arising from the
proposed development.  The agreed details shall be in place prior to the
development being brought into use.
b) Details of facilities for the storage of residential refuse within the proposed
development, including the design, location and access for uplift.  No dwellings
shall be occupied until the facilities for the storage of waste have been provided
within the proposed development, in accordance with the approved scheme.   
Reason: To safeguard the environmental amenity of the area. 
15. That the Flood Risk Assessment (FRA) addendum required under the terms of
Condition 1 of the consent hereby approved shall include the provision of the following
details to the satisfaction of the Council as Planning Authority:-  
a) The updated FRA Addendum will require to include 75% and 90% blockage
scenarios; it will also require to include further sensitivity analysis, with regards to
changes in roughness and to the downstream boundaries of both watercourses
(the River Clyde and the Polmadie Burn).  Information will also be required
regarding the calibration of the model. 
b) The submission of outputs that compare a pre-development (baseline) flood model
run and a post development model run shall also be required.  This will confirm if
the car park will play any additional flood storage role (i.e. as a result of levels being
altered) and address the possibility that the detailed design of the proposed
development might be subject to minor alterations.  
Reason: To ensure the compliance of the development with relevant national planning
policy in respect of flood risk management. 
16. No development shall take place within the development site as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted by the applicant, agreed by the West of Scotland Archaeology Service,
and approved by the Planning Authority.  Thereafter the developer shall ensure that
the programme of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
27

Page 28

Reason: To ensure that all matters of archaeological importance are appropriately
dealt with as part of the redevelopment of the site. 
17. A programme for the implementation/phasing of the various parts of the development
shall be submitted to and approved in writing by the planning authority as part of the
first application for matters specified in conditions. 
Reason: To ensure that if phased, each phase of the development can meet the terms
of the relevant conditions. 
18. That the Drainage Strategy required under the terms of Condition 2 of the consent
hereby approved shall include the provision of the following details to the satisfaction
of the Council as Planning Authority:- 
a) Confirmation of the suitability, in regards to both condition and capacity, of the
existing drainage system on Rutherglen Road to receive surface water
discharge from the development.
b) Full details of the proposed Sustainable Drainage System (SuDS) proposed to
serve the development, including construction, operation and maintenance
details. 
Reason: To ensure that appropriate arrangements are made to address the surface
water and sustainable drainage aspects of the development. 
19. That the additional details required under the terms of Condition 1 of the consent
hereby approved shall include the provision of affordable housing in respect of the
proposed development, amounting to no less than 25% of the total number of
residential units for which consent is sought within the site. 
Reason: To ensure the provision of affordable housing within the site in accordance
with Council requirements. 
20. The maximum floorspace (Gross) and/or number of units within the site area hereby
approved shall not exceed:- 
a) Housing – 450 units
b) Hotel – 150 bedrooms and associated ground floor amenity provision
c) Commercial space to accommodate local facilities (including Class 1A uses,
Class 4 office space, food and drink uses Class 3/sui generis and Class 11
gym/leisure uses) – 700 square metres in total 
Reason: In the opinion of the Planning Authority this level of floorspace and mix of
uses is considered appropriate in terms of the capacity of the consented development
site. 
12 Reason for Decision
12.1. The proposals fully comply with the sustainability and brownfield land considerations
provisions of National Planning Framework 4 (2023) and with the provisions of Policies
1, 2, 5, 7, 11, 12, 13, 14, 15 and 16 of the South Lanarkshire Local Development Plan
2 (adopted 2021).  
28

Page 29

David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/0260 | Mixed use development including residential, hotel and commercial uses,
demolition and ancillary works (Planning Permission in Principle). | Shawfield Stadium
Rutherglen Road Rutherglen G73 1SZ 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk  
29

Page 30

Addendum Specifying Heads of Terms in relation to an agreement under Section 75
of the Town and Country Planning (Scotland) Act 1997. 
Planning
Application No.
P/23/0293
Development
Description
Mixed use development including residential, hotel and
commercial uses, demolition and ancillary works (Planning
Permission in Principle). 
Site Address  Shawfield Stadium
Rutherglen Road
Rutherglen 
Applicant Shawfield Regeneration Ltd 
Date of
Committee 
4th March 2025
Type of
obligation 
Section 75 
Obligations 
Resource Summary of Required Contributions
Community  Contributions towards upgrade of Rutherglen Town Hall, Cunningar
Loop, Overton Park and Eastfield Lifestyles. 
Education  Contributions towards education requirements at the following
schools:- 
 Stonelaw High
 Nursery provision in the local area
Housing  Suitable clauses to ensure that affordable housing is provided as
part of the development.
Roads  N/A 
30

Page 31

31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0332
Proposal:  Erection of dwellinghouse with associated landscaping and access
arrangements 
Site Address:  New Steadings Farm
Green Towers Road
Lanark
ML11 7RB 
Applicant:  Mr David Lowry 
Agent:  Planning Services UK
Ward:  02 Clydesdale North
Application Type:  Detailed Planning Permission
Advert Type:  Non-notification of neighbours 
Development Plan
Compliance: 
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
4
33

Page 34

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee as the Head
of Planning and Regulatory Services, in consultation with the Chair of the Planning
Committee, has determined it raises policy issues meriting consideration by the
Planning Committee. 
2. Site Description
2.1. The application site (0.20 ha) is in open countryside, between Cartland and Lanark.  It
sits on the west side of the access road to New Steading Farm, 60 metres from the
junction with New Towers Road (a minor public road).  The ground gently slopes and
forms part of an agricultural unit. 
3. Description of Proposed Development
3.1. The proposal is for a single storey detached dwelling with associated access.  It is
proposed as a home for a retired farmer who initially wanted to pass New Steading
Farm onto family members although the intention is now to sell to a larger farming
enterprise. 
3.2. The proposed house would contain 3 bedrooms, an open plan living room/kitchen, a
separate lounge, utility room, home office and an integral garage.  Parking would be
provided on site.  The bungalow would have a pitched roof finished in slate, with stone
quoins and roughcast walls. 
4. Relevant Planning History
4.1. There is no relevant planning history for the application site.   
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
 Design Statement
 Supporting Document
 Planning Statemen
 Labour Report
 Agricultural Report 
6. Consultations
6.1. Roads Development Management - No objection subject to conditions covering
visibility, parking, turning and electrical charging points. 
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement for non-
notification of neighbours in the local press, no representations were received. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and sets
out spatial principles, regional priorities, national developments, and national planning
policy.  The relevant policies are:-  
34

Page 35

National Planning Framework 4 Policies 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 – Biodiversity
Policy 4 - Natural places
Policy 14 - Design, quality and place
Policy 15 – Local living and 20 minute neighbourhoods
Policy 16 – Quality homes
Policy 17 – Rural homes 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
Policy 2 - Climate Change
Policy 4 - Green Belt and Rural Area
Policy 5 - Development Management and Placemaking
Policy 14 - Natural and Historic Development 
SLLDP2 Volume 2 Policies
Policy GBRA1 - Rural Design and Development
Policy NHE16 Landscape 
9. Guidance
9.1. NatureScot Developing with Nature Guidance is relevant to all local developments and
provides advice and guidance on how to achieve Policy 3 Biodiversity of NPF4. 
10. Assessment and Discussion
10.1. The determining issues in the consideration of this application are its compliance with
the National Planning Framework 4 (NPF4) and the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2). 
10.2. Climate Change
NFP4 Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2 aim to ensure that proposals for
new development must, where possible, seek to minimise and mitigate against the
effects of climate change. 
10.3. There is no evidence that the development area is affected by flooding.  Solar panels
are proposed for the western and southern roof planes.  If the decision had been to
approve, conditions could have been attached requiring tree planting and the
installation of an electric vehicle charging point.  Overall, the proposal does not
compromise the objectives of NPF4 Policy 1 and Policy 2 and SLLDP2 Policy 2. 
10.4. Principle of Development 
NPF4 Policy 17 Rural homes aims to encourage, promote and facilitate the delivery of
high quality, affordable homes in the right location.  The policy advises that NPF4
supports new homes in the rural area where the development is suitably scaled, sited
and designed and (using the only applicable criteria under (17a) vi for this proposal)
where it is for a single home for the retirement succession of a viable farm holding. 
35

Page 36

10.5. The proposal is for a retirement home for a farmer who runs an established livestock
farm.  Unfortunately, as a Business Plan has not been submitted, despite repeated
requests, it has not been possible to demonstrate that the farm holding is viable as
required by the terms of the policy.  Therefore, the proposal is not fully compliant with
NPF4 Policy 17. 
10.6. NPF4 Policy 16 – Quality Homes seeks to encourage, promote and facilitate the
delivery of high quality homes, in the right locations.  It advises that development
proposals for new homes on land not allocated for housing in the local development
plan (LDP) will only be supported in limited circumstances, in rural locations the
proposal must be consistent with the policy on rural homes. 
10.7. In this case the proposal does not comply with relevant policies on rural homes and
therefore contravenes NPF4 Policy 16. 
10.8. Policy 4 ‘Green Belt and Rural Area’ of the SLLDP2 specifies that within the Rural
Area, the aim is to protect the amenity of the countryside while at the same time,
supporting small scale development in the right places that is appropriate in land use
terms and is of a high environmental quality that will support the needs of communities. 
It functions primarily for agriculture, forestry, recreation, and other uses appropriate to
the countryside.  Development which does not need to be in the countryside will be
expected to be accommodated within the settlements identified on the proposals map. 
Isolated and sporadic development will not be supported. 
10.9. The proposed retirement house is linked to an appropriate rural business, however,
as it has not been established that the business is viable the proposal contravenes
Policy 4 of the South Lanarkshire Local Development Plan 2. 
10.10. SLLDP2: Policy GBR10 Accommodation associated with an Existing or Proposed
Rural Business requires to demonstrate that the house is linked to a viable agricultural
enterprise. 
10.11. Business accounts and profit projections proving the land holding is viable have not
been submitted.  Therefore, in the absence of a Business Plan, the proposal does not
fully comply with SLLDP2 Policy GBRA10. 
10.12. Layout, Siting and Design
NPF4 Policy 14 Design Quality and Place and SLLDP2 Policy 5 Development
Management and Placemaking and Policy GBRA1 Rural Design and Development
aim to ensure well designed development that makes for successful places and
considers the impact on residential amenity and the appropriateness of the
development to a rural setting.  Proposed developments shall be well related to locally
traditional patterns and scale and shall avoid the introduction of suburban-style
developments into the rural environment.  Proposals specifically for residential
development should not be isolated or sporadic. 
10.13. The site is isolated and due to the intervening distance, the proposed house would not
visually integrate with or consolidate the nearest building group, to the north east –
two existing dwellings and associated outbuildings and stables.  The applicant has
resisted suggestions that the house should be located at the farm steading, in
accordance with established practice for retirement homes.  The applicant’s preferred
alternative solution would be to locate the house at the entrance to the farm access. 
Plans were submitted for this, however, that cannot be dealt with as an amendment to
the current application as it falls out with the application boundary.  
36

Page 37

10.14. Although there are elements of the design which are acceptable such as a slate roof,
chimneys and quoins, generally the house has a suburban appearance, inappropriate
to a rural setting.  Suburban components include an L-shaped footprint, shallow roof
pitch on the eastern gable and windows and garage door with a horizontal emphasis. 
Attempts to improve the design have been resisted on grounds that the design is not
dissimilar to nearby dwellings.  However, the houses referred to were built more than
twenty years ago.  It is important that past developments should not set a continuing
precedence justifying suburban development now and into the future, at the expense
of aspirations to improve design quality in the countryside.  The Design Statement
refers to the retention of trees along the site frontage which would help the
development blend in.  These trees have not been annotated on the site plan,
however, photographs and a site visit have revealed that these trees are poor quality
specimens with limited visual presence and life expectancy. 
10.15. The proposed development of a new dwelling in the rural area, contrary to policies
designed to preserve that rural area from housing in inappropriate locations and
promote compact urban growth, is not considered to be characteristic of a liveable
place.  The design of the dwelling is suburban in appearance, and inappropriate for a
rural area.  On this basis, it is considered that the application proposal is contrary to
NPF4 Policy 14 and SLLDP2 Policies 5 and GBRA1. 
10.16. Policy 15 Local Living and 20 minute neighbourhoods states: ‘Development proposals
will contribute to local living including, where relevant, 20 minute neighbourhoods.  To
establish this, consideration will be given to existing settlement pattern, and the level
and quality of interconnectivity of the proposed development with the surrounding
area, including local access to: sustainable access (including local public transport
and safe, high quality walking, wheeling and cycling networks), employment,
shopping, health and social care facilities, schools and play areas.’ 
10.17, The site is in a rural location where many of the characteristics of the 20-minute
neighbourhood or achieving wider local living aspirations are not possible.  National
policy accepts that a retirement succession home is, in principle, acceptable and in a
rural location, where a 20 minute neighbourhood is unrealistic, can be justified. 
10.18. Natural and Historic Environment
NPF4 Policy 3 Biodiversity under part (c) details that all local developments shall
include appropriate measures to conserve, restore and enhance biodiversity.  The
Development with Nature Guidance is pertinent in this case.  The guidance
encourages a mitigation hierarchy to be applied – avoid, minimise, restore, and offset
to achieve a net positive biodiversity impact. 
10.19. The applicant has indicated trees along the front boundary will be retained and
replaced where necessary.  These trees are poor quality specimens and have not
been depicted on the site plan nor has any additional tree planting around the
boundaries been proposed.  Notwithstanding, landscaping of the site and other
biodiversity measures could be undertaken on site.  As the site comprises managed
agricultural grassland the proposal will not have a significant impact upon protected
habitats or species.  Therefore, the proposal accords with NPF4 Policy 3. 
10.20. NPF4 Policy 4 Natural Places is of relevance due to the site falling within a designated
Special Landscape Area as identified in the adopted Local Plan.  The policy states
‘Development proposals that affect a site designated as a local nature conservation
site or landscape area in the LDP will only be supported where: Development will not
have significant adverse effects on the integrity of the area or the qualities for which it
has been identified’. 
37

Page 38

10.21. SLLDP2 Policy 14 – Natural and Historic Environment advises that the Council assess
all development proposals in terms of their impact on the natural and historic
environment, including biodiversity, geodiversity, landscape, and townscape.  In
Category 3 areas (which includes Special Landscape Areas) development which
would have a significant adverse impact following the implementation of mitigation
measures will only be permitted where the effects are outweighed by significant social
or economic benefits.  Where possible, any development proposals which affect
natural and historic designations should include measures to enhance the
conservation value of the site affected. 
10.22. SLLDP2 Policy NHE16 – Landscape advises that development proposals within
Special Landscape Areas will only be permitted where they can be accommodated
without having an unacceptable significant adverse effect on the landscape character,
scenic interest and special qualities and features for which the area has been
designated.  All proposed development should take into account the detailed guidance
contained in the South Lanarkshire Landscape Character Assessment 2010.  The site
falls within the Rolling Farmland Landscape type.  In this area developments should
be sited to maximise natural screening and integration provided by topography and
woodland variety.  The landscape would be sensitive to schemes which break
ridgelines and fail to respond to topography.  New land uses that would result in the
introduction of new features, should be discouraged, particularly in prominent areas. 
10.23. The proposed site sits in a prominent exposed location above the Mouse Valley and
in such a location a dwelling would be highly visible over an extensive area especially
as it lacks an established woodland or building group backdrop.  There are some poor
quality trees located along the site frontage, however, the visual screening afforded
would be minimal.  Also, the life expectancy of these trees is limited, and any
replacement trees would take years to mature to a size and form with screening
credentials.  In considering the above, the proposal contravenes NPF4 Policy 4 and
SLLDP2 Policies 14 and NHE16. 
10.24. Conclusion
Insufficient information has been provided demonstrating that the proposed retirement
succession home is linked to a viable landholding.  The design of the house is
inappropriate for a rural location as it has a suburban appearance, countering local
and national objectives to improve design quality in the countryside.  The site sits
isolated and separate from the nearest building group. 
10.25. The introduction of a suburban style house in a prominent location would erode the
special qualities of the landscape in this area.  In summary, the proposed development
fails to adhere to the provisions of the development plan, with specific regard to
Policies 4, 14, 16 and 17 of NPF4 (adopted 2023) and Policies 4, 5, 14, GBRA1,
GBRA10 and NHE16 of the South Lanarkshire Local Development Plan 2 (adopted
2021) and there are no material considerations which would outweigh this variance
with the development plan.  In view of this, it is considered that the application be
refused planning permission.    
38

Page 39

11. Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse planning permission for the following reasons:- 
01. The proposal would be contrary to Policy 4 (Green Belt and Rural Area) of the
South Lanarkshire Local Development Plan 2 as it would constitute an
inappropriate form of development, without appropriate justification. 
02. The proposal would be contrary to Policy 5 (Development Management and
Placemaking) and GBRA1 (Rural Design and Development) of the South
Lanarkshire Local Development Plan 2 as it would constitute an inappropriate
form of development, without appropriate justification, which would exacerbate
the impression of suburbanisation at this location, leading to further erosion of
the rural character. 
03. The proposal would be contrary to Policy GBRA10 (Accommodation
Associated with an Existing or Proposed Rural Business) of the South
Lanarkshire Local Development Plan 2 as the business has not been proven to
be viable. 
04. The proposal would be contrary to SLLDP2 Policies 14 'Natural and Historic
Environment) and NHE16 'Landscape' as it would erode the character of a
designated Special Landscape Area. 
05. The proposal would be contrary to Policy 4 - Natural places of National Planning
Framework 4 as it would erode the character of a designated Special
Landscape Area. 
06. The proposal would be contrary to Policy 14 - Design, Quality and Place of
National Planning Framework 4 as it is not consistent with the 6 qualities of
successful places.   
07. The proposal would be contrary to Policy 16 - Quality Homes of National
Planning Framework 4 as the proposal is not consistent with the policy on rural
homes. 
08. The proposal would be contrary to Policy 17 - Rural homes of National Planning
Framework 4 as a Business Plan has not been submitted demonstrating that
the proposed retirement succession home is linked to a viable farm holding. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:-
P/24/0332 | Erection of dwellinghouse with associated landscaping and access
arrangements. | New Steadings Farm Green Towers Road Lanark ML11 7RB 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
39

Page 40

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867 
E-mail:  planning@southlanarkshire.gov.uk 
40

Page 41

41

Page 42

42

Page 43

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1069
Proposal:  Formation of fishing ponds and associated facilities (Section 42
application to vary the terms of condition No. 21 of consent P/19/1807
to allow continued operations at the site for a further 10 year period) 
Site Address:  Woodend Farm
Carnwath
Lanark
ML11 8LR 
Applicant:  Onyx Leisure Ltd 
Agent:  ICDP Architects
Ward:  03 Clydesdale East
Application Type:  Full Planning Permission
Advert Type:  Non-notification of neighbours 
Development Plan
Compliance: 
Yes 
Departures:  N/A
Recommendation:  Grant subject to conditions
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
5
43

Page 44

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee within the
context of the approved South Lanarkshire Scheme of Delegation (2024) as it relates
to a major development. 
2. Site Description
2.1. The application site lies to the east of the B7016, approximately 2km to the north of
Carnwath, between a conifer plantation and the Dippool Water.  The site occupies a
total area of 17.3 hectares.  Access is via an existing track (approximately 1km in
length) taken directly off the B7016.  The existing access currently also serves
Woodend Farm (which sits immediately adjacent to the B7016). 
2.2. Work has started on site with a pond partly formed.  An access, hard standing,
compound with car park, site office and weigh bridge has been established on site. 
Throughout the site there are mounds of excavated sand and gravel.  The entrance
has been widened and surfaced with concrete for the first 33m, from the edge of the
public road. 
3. Description of Proposed Development
3.1. The application is made under Section 42 of the Town and Country Planning
(Scotland) Act 1997 (as amended) and is an application for planning permission for
the development of land but without compliance with a condition or conditions attached
to a previous planning permission. 
3.2. In this instance, the application seeks to vary the terms of condition 21 attached to
Planning Permission P/19/1807 which was granted in September 2020 for the creation
of 3 fishing ponds through the extraction of sand and gravel from the raised mounds
at the forestry edge.  The amendment of the condition is to enable a further 10 years
of operations at the site including excavations, land engineering, landscaping and
pond creation. 
3.3. Condition 21 of application P/19/1807 states:- All extraction operations on the site shall
be discontinued not later than 01 February 2025 and, within a period of 12 months
from this discontinuance date, the entire site shall be restored in accordance with the
approved restoration plan to the satisfaction of the Council as Planning Authority. 
3.4. The applicant has requested that the condition be varied to read:- All extraction
operations on the site shall be discontinued not later than 10 years from the date of
this Planning Permission and, within a period of 12 months from this discontinuance
date, the entire site shall be restored in accordance with the approved restoration plan. 
3.5. In this report the condition is listed as No. 09 due to re-ordering as some conditions
attached to the previous consent P/19/1807 have now been discharged. 
4. Relevant Planning History
4.1. The original Planning Permission CL/12/0511 for the formation of fishing ponds and
associated facilities was granted in April 2013.  A Section 42 application to vary
condition 25 attached to Planning Permission CL/12/0511, to enable an extension of
the extraction period by a further 6 years was granted in September 2020. 
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
 Dust Management Report
 Maintenance Plan
44

Page 45

 Traffic Management Plan
 Flood Risk Assessment Report
 Hydrogeological Assessment
 Surface Water Features Survey Report 
6. Consultations
6.1. Roads Development Management Team - No objection subject to appropriate roads
related conditions. 
Response: Noted. 
6.2. NatureScot – Requested a condition preventing road widening onto or material storage
within the confines of the Site of Special Scientific Interest (SSSI). 
Response: An appropriate condition is proposed to address this matter. 
6.3. Scottish Environmental Protection Agency (SEPA) – No objection. 
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement for non-
notification of neighbours, one objection and one representation have been received. 
The issues raised are summarised as follows:- 
Roads Related Matters
⧫ Land ownership at the site entrance is under dispute and it is not possible to
install a wheel wash where first planned.
⧫ The top access is unsuitable for large vehicles. 
Other Matters Raised
⧫ There is no operational weighbridge therefore no paperwork for transactions.
⧫ Boulders were placed in front of the access at a neighbouring property.
⧫ A neighbouring resident was advised that their septic tank would be removed. 
7.2. Other non-material planning comments were included in representations:- 
⧫ The holder of the servitude cannot extend the right to third parties unless
expressly permitted.
⧫ Servitudes cannot be materially changed in a way that increases the burden on
burdened land.
⧫ The applicant should negotiate with the burdened landowner to extend the
servitude or create a new one for third party use. 
7.3. The above issues are considered in the assessment below.  These letters are
available for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and sets
out spatial principles, regional priorities, national developments, and national planning
policy.  The relevant policies are:-  
45

Page 46

National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 3 - Biodiversity
 Policy 14 - Design, quality and place
 Policy 29 - Rural development
 Policy 30 - Tourism
 Policy 33 - Minerals 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 6 - Visitor Economy and Tourism
 Policy 19 - Minerals Development 
SLLDP2 Volume 2 Policies
 GBRA1 - Rural Design and Development
 Policy GBRA2 - Business Proposals within Green Belt and Rural Area
 Policy VET1 - Visitor Attractions 
9. Guidance
9.1. NatureScot Developing with Nature Guidance is relevant to all local developments and
provides advice and guidance on how to achieve Policy 3 Biodiversity of NPF4. 
10. Assessment and Discussion
10.1. Introduction
This application has been submitted under Section 42 of the Town and Country
Planning (Scotland) Act 1997 (as amended) and seeks to extend the time period for
excavation of sand and gravel to be carried out to form fishing ponds on land at
Woodend Farm near Carnwath.  Section 42 of the Act states that:-  
'On such an application, the Planning Authority shall consider only the question of the
conditions subject to which planning permission should be granted.’ 
10.2. This type of application, therefore, does not revisit the principle of development on the
site but only considers the appropriateness of the conditions attached to the previous
consent and whether it is acceptable to amend or delete as requested.  Whilst, in
essence, a Section 42 is an application to vary condition(s) on an existing permission,
the process requires a new, stand-alone planning permission to be issued for the
original development but with a new suite of conditions, including all those still thought
to be relevant as well as the varied condition(s).  Should the proposed amendment to
the condition(s) not be acceptable, a Section 42 application is to be refused but without
affecting the status of the original permission. 
10.3. In assessing whether any condition is still relevant there is a requirement to consider
certain aspects of the development.  In this instance, the applicant has requested that
condition 21 is amended.  However, it is noted that the nature of the legislation requires
46

Page 47

all conditions to be revisited as they may be linked or connected to these specific
conditions.  The main matters for consideration are, therefore, whether the proposed
amendment to the condition proposed would undermine the reasons for the original
conditions or the Development Plan position; and if it is considered this Section 42
application does undermine either of these, whether there are material considerations
which would outweigh this to allow permission to be granted. 
10.4. The determining issues in the consideration of this application are its compliance with
the National Planning Framework 4 (NPF4) and the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2). 
10.5. Climate Change
NFP4 Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2 aim to ensure that proposals for
new development must, where possible, seek to minimise and mitigate against the
effects of climate change. 
10.6. The application seeks a time extension of 10 years to allow the formation of fishing
ponds.  The method of mineral extraction and restoration of the site has previously
been approved by condition discharge and does not involve any additional
infrastructure being created.  Most of the site will comprise landscaped greenfield with
water bodies which is a sustainable land use for the countryside.  The development
will utilise an existing access road.  A substantial area of native tree planting will be
established around the pond margins.  It is therefore considered that the proposals
comply with the relevant criteria of these policies. 
10.7. Principle of Development 
SLLDP2 Policy 4 ‘Green Belt and Rural Area’ of the SLLDP2 specifies that within the
Rural Area, the aim is to protect the amenity of the countryside while at the same time,
supporting small scale development in the right place that is appropriate in land use
terms and is of a high environmental quality that will support the needs of communities. 
It functions primarily for agriculture, forestry, recreation, and other uses appropriate to
the countryside. 
10.8. SLLDP2 Policy GBRA2 ‘Business Proposals within the Greenbelt and Rural Area’
reiterates that proposals should be an appropriate use in the rural area.  The policy
lists types of development considered appropriate in the rural area including:
recreation, tourism, holiday accommodation, leisure and sporting developments. 
10.9. It is considered that the principle of the development has already been deemed
acceptable within the Rural Area through the granting of the previous planning
permission P/19/1807 and the proposed amendment to condition 21 of said
permission has no further implications on the countryside strategy set out within the
Development Plan.  It is therefore considered that the proposals comply with SLLDP2
Policies 4 and GBRA2. 
10.10. Layout, Siting and Design
NPF4 Policy 14 Design Quality and Place and SLLDP2 Policy 5 Development
Management and Placemaking and GBRA1 - Rural Design and Development aim to
ensure well designed development that makes for successful places and considers
the impact on residential amenity and the appropriateness of the development to a
rural setting. 
10.11. The proposals are to extend the lifetime of the extraction period by a further 10 years. 
It is considered that, in terms of both landscape and visual impact, the extended time
period would not have a long-term adverse impact upon the landscape.  The site is
47

Page 48

currently well screened in the context of the wider area by woodland and topography. 
The distance from the nearest public road further reduces the visual impact.  Once
complete, the fishing ponds and associated landscaping will be a feature which
integrates with and enhances the landscape quality of the area.  In addition, the
residential amenity of the area would not be adversely affected subject to the
implementation of conditions. 
10.12. The access route will use the improved track which served the nearby peat extraction
works.  The route would be a reasonable distance from the nearby residential
properties. 
10.13. It is therefore considered that the amendment to condition 21 would be in accordance
with NPF4 Policy 14 and SLLDP2 Policy 5. 
10.14. Rural Development and Tourism 
NPF4 Policy 29 Rural Development states that development proposals which
contribute to the viability, sustainability and diversity of rural communities and local
rural economy will be supported. 
10.15. NPF4 Policy 30 Tourism states: Proposals for tourism related development will take
into account: (i). The contribution made to the local economy; (ii). Compatibility with
the surrounding area in terms of the nature and scale of the activity and impacts of
increased visitors; (iii). Opportunities for sustainable travel and appropriate
management of parking and traffic generation and scope for sustaining public
transport services, particularly in rural areas. 
10.16. SLLDP2 Policy 6 ‘Visitor Economy and Tourism’ states ‘The provision of new, high
quality visitor attractions, activities, facilities, infrastructure and accommodation, and
the safeguarding and maintenance of existing features will be supported where they
are shown to positively contribute towards the visitor economy.  Policy VET1 ‘Visitor
Attractions’ will support the creation of new visitor attractions or the expansion of
existing facilities in appropriate locations where the financial viability and contribution
of the proposal towards the visitor economy and attracting visitor footfall can be
demonstrated. 
10.17. In the recent past, progress in forming the ponds has been impeded by legal disputes
and the Covid 19 pandemic.  With the resolution of theses constraints, meaningful
progress can now be made.  Ten years in 3 phased stages is considered both a
realistic and cautious timescale.  Extending the operational period by a further 10
years would not deviate from or change the intention to create fishing ponds.  The
proposal will provide an attractive environment for fishing and will be an additional
recreational asset in South Lanarkshire.  The leisure business will create employment
opportunities and contribute to the local economy.  It is therefore considered that the
amendment to condition 21 would be in accordance with NPF4 Policies 29 and 30 and
SLLDP2 Policies 6 and VET1. 
10.18. Natural and Historic Environment
NPF4 Policy 3 Biodiversity under part (c) details that all local developments shall
include appropriate measures to conserve, restore and enhance biodiversity.  The
Development with Nature Guidance is pertinent in this case.  The guidance
encourages a mitigation hierarchy to be applied – avoid, minimise, restore, and offset
to achieve a net positive biodiversity impact.  
48

Page 49

10.19. Extensive areas of landscaping around the ponds includes native trees, hedgerows,
marginal and aquatic plants.  The proposed landscaping and pond creation will
enhance biodiversity.  To avoid adverse impacts upon protected species, regular
monitoring and mitigation measures, as recommended by appointed ecological
consultants, will be undertaken during the construction phases.  Therefore, the
proposal accords with NPF4 Policy 3. 
10.20. Mineral Development 
NPF4 Policy 33 advises sustainable extraction of minerals will only be supported
where adverse impacts upon biodiversity, geodiversity and the natural environment
can be avoided.  The proposal needs to demonstrate there are no significant adverse
impacts on any homes.  Any noise, dust, vibration and potential for pollution needs to
be at an acceptable level.  Transport impacts need to be minimised.  A high standard
of restoration and after care is required.  Safeguards should include a restoration bond. 
10.21. SLLDP2 Policy 19 – Minerals states any development proposals for mineral extraction
must be carried out with impacts reduced to acceptable levels and with appropriate
mitigation. 
10.22. There are material differences in the pond depths and extraction quantities compared
to what was approved by the original Planning Permission (Ref. CL/12/0511).  A
section 42 application does not require a complete reconsideration of the Planning
merits.  Works to implement the proposal have already started.  Extraction,
Restoration and Aftercare/Maintenance plans, detailing the referred updated pond
depths and extraction quantities, were submitted to support the discharge of conditions
09 ‘Landscaping’ and 22 ‘Restoration scheme’ attached to Planning Permission
P/19/1807.  These conditions have since been discharged.  The said plans have been
marked in the file for P/19/1807 as having been approved.  If planning permission is
granted a revised restoration bond, taking account of increased pond depth and
excavated material, to be concluded with the Council, will be required by condition. 
10.23. The creation of ponds along with additional tree planting will enhance the environment
and create an asset in an area of limited landscape appeal.  The proposal will not have
an adverse impact upon the nearby Kames SSSI (a geological feature) or any historic
designations.  The amount of mineral extraction and importation over the extended 10
year period is considered relatively small scale in comparison to larger operations
elsewhere in South Lanarkshire and over the construction period, the number of
vehicle trips generated is unlikely to be significant.  The adjacent peat extraction site
has now ceased operations thereby reducing cumulative impacts which were
prevalent at the time the previous planning permission was determined.  Roads,
Transportation and Fleet Services have not objected to this application.  The entrance
has already been widened and improved with concrete surfacing.  Speed restriction
signage has been installed along the access route.  The extraction area itself is remote
from housing.  As a result, there would not be an adverse effect on residential amenity. 
If planning permission is granted, conditions will be applied requiring confirmation on
daily traffic generation, a wheel wash facility, restricted hours of operation, compliance
with approved dust mitigation plans and the approval of pollution control measures. 
10.24. In view of this assessment. it is considered that the section 42 application does not
compromise NPF4 Policy 33 and SLLDP2 Policy 19. 
10.25. Conclusion
It is considered that the extension of the lifetime of the extraction period to form the
fishing ponds for a further 10 years is acceptable as it will not prejudice the
development plan nor have an adverse impact on landscape character, residential and
49

Page 50

visual amenity and road safety.  The variation to the condition will not affect the
outcome or intent of the original approval. 
10.26. It is therefore recommended that permission be granted.  Under the terms of Section
42 of the Town and Country Planning (Scotland) Act 1997 if a Planning Authority is
content that the proposed changes to conditions are acceptable, as in this instance, a
new planning permission with amended conditions could be issued.  It is considered
that whilst it is acceptable to amend condition 21 as requested, other conditions should
be updated and/or removed as necessary to any new permission issued.  This ensures
that the new permission is consistent with the Development Plan and previous
assessment.  It should be noted that some conditions have already been fully or
partially discharged.  In addition, several additional conditions are proposed which
reflects the effects of the development to date. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following conditions:- 
01. The operator shall abide by the approved dust monitoring and management plan,
unless otherwise agreed in writing by the Council as Planning Authority. 
Reason: To minimise any nuisance; to protect the amenity of nearby properties;
and to minimise the chance of dust being transmitted onto the public highway. 
02. That within 4 months from the date of this permission (and each year thereafter)
the operator shall submit to the Planning Authority an annual progress plan
detailing:- 
 The extent of ongoing extraction operations;
 Areas prepared for extraction;
 Water quality;
 The extent of backfilling or restoration operations carried out;
 The extent of landscaping, nature conservation and agricultural works that have
been implemented;
 Current and anticipated production figures;
 Remaining reserves;
 Compliance with statutory permissions;
 Site complaint logs and actions taken.  
Reason: To ensure that the Planning Authority is informed at regular intervals of
the progress of the site. 
03. That within two months of the date of this Planning Permission, a scheme showing
the details of peat/soil stripping at the site and the storage and proposed use and
replacement of peat/soil and subsoil shall be submitted to the planning authority. 
The scheme shall have regard to the drainage implications of soil movement and
storage.  All soil stored on site shall be stored in accordance with BS 3882. 
Thereafter, all soil stripping, storage and replacement operations shall accord with
the approved details as approved by the planning authority.  In particular, the
scheme shall incorporate a method statement setting out the measures to protect,
store and replace peat/soil and any necessary mitigation measures.  
Reason: In the interests of amenity and in order to retain effective planning control.  
50

Page 51

04. That within one month of the date of this Planning Permission a Pollution
Prevention and Incident and Waste Management Plan which includes mitigation
measures against environmental pollution during the life of the site shall be
submitted to the Planning Authority.  
Reason: In the interests of pollution and waste control. 
05. That the approved landscaping scheme shall be completed during the first
available planting season following completion of each phase of the development. 
Reason: In the interests of amenity. 
06. That within one month of the date of this permission the developer shall ensure a
programme of archaeological works, in accordance with the approved written
scheme of investigation, is fully implemented and that all recording and recovery
of archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason: In order to safeguard any archaeological items of interest or finds. 
07. The mitigation measures for birds, otters and badgers as outlined in the Badger
and Otter Survey (Wild Surveys Ltd, October 2023) shall be fully implemented
during all phases of construction. 
Reason: In the interests of wildlife. 
08. The silt and freshwater lagoons shall be properly lined and located at least 5 metres
away from the Dippool Water in accordance with a scheme to be submitted to and
approved by the Planning Authority.  
Reason: To limit pollution and to prevent erosion of the river bank. 
09. All extraction operations on the site shall be discontinued not later than ten years
from the date of this Planning Permission and, within a period of 12 months from
this discontinuance date, the entire site shall be restored in accordance with the
approved restoration plan to the satisfaction of the Council as Planning Authority.  
Reason: To ensure that the Planning Authority retains effective control of the
development and to ensure that the site is satisfactorily restored. 
10. Upon the termination of extraction operations, all plant, machinery, buildings and
the foundations thereof shall be removed from the site, and the areas so occupied
restored in accordance with the approved restoration and 5 year aftercare scheme
shall be carried out to the satisfaction of the Planning Authority in accordance with
the approved details and within the agreed timescale. 
Reason: To ensure that the Planning Authority retains effective control of the
development and to ensure that the site is satisfactorily restored. 
11. That the mitigation measures contained in section 4.8 'Flood Management
Measures' of the Flood Risk Assessment Report (Gondolin, Land and Water,
December 2023)' shall be adhered to during the construction/excavation and
operational phases.  
51

Page 52

Reason: To ensure appropriate flood risk mitigation measures are in place. 
12. The developer shall ensure that any vehicle transporting excavated material on or
off the site must be treated by means of adequate wheel washing facilities.  The
facility will require to be in operation at all times during earth moving operations. 
The wheel washing facility shall be fully operational prior to works commencing on
site.  A ''clean zone'' shall be maintained between the end of the wheel wash facility
and the public road.  Furthermore, the developer shall ensure a road brush motor
is made available throughout the construction period to ensure adjacent roads are
kept clear of mud and debris.  
Reason: In the interests of road safety. 
13. That prior to any further work starting on site, a programme indicating the phasing
of construction of development and number and rate of heavy goods vehicles
entering the site on a daily basis, shall be submitted for the written approval of the
Planning Authority.  The approved details shall be implemented throughout the
period of the development of the site.  
Reason: In the interests of road safety. 
14. Within one month of the date of this Planning Permission a revised restoration bond
taking account of increased pond depth and excavated material shall be concluded
with the Council.  This will include a guarantee to cover all site restoration for each
phase of the construction in the event that the development is not satisfactorily
completed shall be submitted for the written approval of the Council as Planning
Authority.  Such guarantee must, unless otherwise agreed in writing:- 
i) be granted in favour of the Council as Planning Authority 
ii) be granted by a bank or other institution which is of sound financial
standing and capable of fulfilling the obligations under the guarantee;
iii) be for a specified amount which covers the value of all site restoration
and aftercare liabilities as agreed between the developer and the planning
authority at the commencement of development
iv) either contain indexation provisions so that the specified amount of the
guarantee shall be increased on each anniversary of the date of this consent
by the same percentage increase in the General Index of Retail Prices (All
Items) exclusive of mortgage interest published by or on behalf of HM
Government between the date hereof and such relevant anniversary or be
reviewable to ensure that the specified amount of the guarantee always covers
the value of the site restoration and aftercare liabilities 
v) come into effect on or before the date of commencement of development
and expire no earlier than 12 months after the end of the construction period.  
No further work shall be undertaken at the site until (1) written approval of the
Council as Planning Authority has been given to the terms of such guarantee
and (2) thereafter the validly executed guarantee has been delivered to the
Council as Planning Authority.  
In the event that the guarantee becomes invalid for any reason, no further
operations will be carried out on site until a replacement guarantee completed
in accordance with the terms of this condition is lodged with the Council as
Planning Authority.  
52

Page 53

Reason: To ensure that provision is made for the restoration and aftercare of
the site. 
15. That the hours of operation during the creation of the fishing ponds through the 
excavation of sand and gravel and lorry movements associated with the
export/import of material from the site shall be limited to between 8am and 7pm
Monday to Friday; 8am and 1pm on Saturday and at no time at all on Sunday or
public holidays. 
Reason: In the interests of residential amenity. 
16. That within one month of the date of this permission written details of a
maintenance scheme for the access road shall be submitted for the written
approval of the Planning Authority.   
Reason: To ensure that the developer contributes to the maintenance of the access
road. 
17. The existing access track shall not be widened or expanded in any way to the
southeast of its current line and no materials shall be dumped or stored to the
south-east of the track's current line. 
Reason: This is to protect the integrity of the Carstairs Kames SSSI. 
12. Reason for Decision
12.1. The amendment to condition 21 is considered acceptable.  Extending the extraction
period by a further 10 years, does not contravene the relevant provisions of the
Development Plan subject to the imposition of the attached environmental conditions
as allowed under Section 42 of the Town and Country Planning Act (Scotland) 1997
as amended.  The development also complies with the relevant policies contained in
the development plan. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/1069 | Section 42 application to vary the terms of condition No. 21 of consent P/19/1807
to allow continued operations at the site for a further 10 year period | Woodend Farm
Carnwath Lanark ML11 8LR 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk
53

Page 54

54

Page 55

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1185
Proposal:  Erection of single storey dwellinghouse and relocation of existing
stables 
Site Address:  Knowehead Farm
Blackburnmill Highway
Strathaven
ML10 6RP 
Applicant:  Mr Bavaird
Agent:  DTA
Ward:  05 Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News 20th November 2024
Development Plan
Compliance: 
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
6
55

Page 56

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee as the Head
of Planning and Regulatory Services in consultation with the Chair of the Planning
Committee has determined it raises policy issues meriting consideration by the
Planning Committee. 
2. Site Description
2.1. The application site is located within the designated Green Belt, approximately 140
metres East of Knowehead Farm, Blackburnmill Highway, Strathaven.  The application
site boundary is contained within an agricultural field which gradually slopes down in
a southerly direction and is bound to the east and south by mature trees and shrubs
and a hedgerow and fence along the northern boundary of Blackburnmill Highway. 
Beyond the rest of the field there are individual residential properties located to the
east and west.   
2.2. Currently there are horse shelters located approximately 80 metres to the southwest
of the site, however, these do not benefit from planning permission and the current
equestrian use of the land for this purpose is unauthorised.  There is an existing field
gate access to the east of the site off Blackburnmill Highway, which is outwith the site
and is not part of this proposal. 
3. Description of Proposed Development
3.1. The proposal seeks the erection of a single storey dwellinghouse and the relocation of
the nearby horse shelters to within the proposed residential site.  The area of the
proposed site would extend to 0.33Ha with the horse shelters positioned to the rear of
the dwellinghouse.  Three off street parking spaces are identified on the submitted
plans to the front of the proposed property.  No details of the proposed boundary
treatment to the site or a site access were submitted with the application. 
3.2. The proposed single storey dwellinghouse would contain a large open-plan
kitchen/living/dining space, lounge, snug, utility, bathroom and three bedrooms, one
with en-suite at ground floor level.  A paved patio area would be located at the rear of
the property.  The Design Statement submitted with the application advises that the
proposed finishing materials for the property would consist of a combination of stone
and render to the walls, black framed window and doors and a slate roof. 
3.3. The proposed horse shelters would be of a basic construction containing three timber
sides, open fronts and a corrugated roof. 
4. Relevant Planning History
4.1. The applicant has advised that the horse grazing/end-of-life care business has been
in operation at the site for three years.  There is no record of planning approval for this
business operation or for the erection of the horse shelters at this location.  The
business and shelters are an unauthorised development and a Planning Enforcement
case has been opened to investigate this planning breach. 
4.2. The applicant previously submitted a planning application for a similar development in
2023 (P/23/0647) which was refused due to the lack of justification for a new
dwellinghouse at this Green Belt location. 
4.3. Planning Application P/21/1892 for the erection of an agricultural worker's
dwellinghouse was also submitted by the applicant in October 2021.  This application
was returned prior to validation as the requested information was not received. 
56

Page 57

5. Supporting Information 
5.1. The agent submitted a Design Statement and Business Plan with the application.  This
has been considered as part of the assessment of the application, below. 
6. Consultations
6.1.  Roads Development Management – Objected to the proposal due to insufficient
details on access dimensions, lack of turning facilities, visibility splays and details on
how the stables will be accessed. 
Response:  Noted.  The Planning Service requested this information from the agent,
however, it has not been submitted. 
6.2.  Environmental Services – No objection to the proposal.  Requested advisory notes
relating to construction noise, nuisance, and a note about the role of SEPA. 
Response:  Noted.  These matters could be addressed through conditions and
advisory notes on the decision notice if the application was to be approved. 
6.3. Scottish Water – No objection to the proposal.  Have advised that there is sufficient
water capacity in the area but no public wastewater infrastructure which could serve
the site. 
Response:  Noted.   
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, no
representations have been received. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 (2023) 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 8 - Green belts
 Policy 14 - Design, quality and place 
 Policy 15 - Local living and 20 minute neighbourhoods 
 Policy 16 - Quality homes 
8.3.  South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will also assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan (SLLDP2).  In this regard, the application site and associated
proposals are affected by the following policies:- 
SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking 
57

Page 58

SLLDP2 Volume 2 Policies 
 Policy GBRA1 - Rural Design and Development 
 Policy GBRA10 - Accommodation Associated with an Existing or Proposed Rural
Business
 Policy DM15 - Water Supply
 Policy DM16 - Foul Drainage and Sewerage 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
Full planning permission is sought for the erection of a single storey dwellinghouse
and the relocation of existing stables for an equestrian business.  The main issues to
be addressed in the determination of this application include the acceptability in
principle of the proposed development, its layout, siting and design, and an
assessment of technical matters.  The relevant policies set out above will be assessed
in turn alongside any relevant material considerations. 
10.2. Principle of Development
In terms of the principle of the development, as the site is located within the designated
Green Belt, NPF4 Policy 8 - Green Belts applies.  NPF4 Policy 8 provides a list of
appropriate Green Belt uses, with limited new-build residential development linked to
essential farm workers/key workers, retired farm workers or the one-for-one
replacement of existing residential dwellings only.  Developments in these categories
are also required to demonstrate a specific locational need, that would not undermine
the purpose of the Green Belt and would require to be compatible with the surrounding
established countryside and landscape character.  In terms of NPF4 Policy 8, the
proposal does not meet any of the criteria nor is there a specific locational need.  The
applicant does not own the land in question and the current business and land-use at
the site is unauthorised and is subject to a separate enforcement investigation. 
10.3. SLLDP2 Policy 4 - Green Belt and Rural Area would also be relevant to this proposal. 
This states that the purpose of the Green Belt is to; direct development to the most
appropriate locations and support regeneration, protect and enhance the character,
landscape setting and identity of the settlement, and protect and provide access to
open space.  Development which does not require to locate in the countryside will be
expected to be accommodated within the settlements identified on the proposals map. 
10.4. SLLDP2 Policy GBRA10 - Accommodation Associated with an Existing or Proposed
Rural Business - advises that within the Green Belt and Rural Area the provision of a
dwelling house or temporary accommodation may be considered in association with a
rural business.  Proposals will be required to meet the following criteria:- 
All Proposals 
 The applicant should first consider whether there are traditional buildings suitable
for conversion, redundant buildings, gap sites or opportunities to consolidate a
building group within the land available to them. 
 The business proposal shall comply with Policy GBRA2. 
 It is demonstrated that accommodation is essential for the successful
management of the business. 
58

Page 59

 It is demonstrated that the business (new, relocating or established) is based upon
a robust market assessment, planned on a sound financial basis and the business
will become viable in the long term. 
 The submission of a 5 year business plan will be required to demonstrate
compliance with criteria 3 and 4. 
 The accommodation shall meet rural design policy as set out in Policy GBRA1 and
in supporting planning guidance. 
10.5. The submitted application does not meet the above criteria as the business has no
planning permission, has not demonstrated it is based on a sound financial basis and
is viable and has not submitted a satisfactory business plan.  The proposal therefore
fails the requirements of Policy GBRA10. 
10.6. The applicant has advised that the business of leasing out the field and shelters has
been in operation for three years without the need for a residential property on site. 
The applicant also advises in their Design Statement that they lease the field and
maintain the shelters but are not engaged in the care of the horses.  Even once a
house is built, the proposal is that the owners would still be required to visit the site
daily to tend to the horses, as is the current position.  As such, the applicants own
submission confirms that there is no need for on-site residential accommodation for
the existing, unauthorised, business. 
10.7. The applicant submitted a Business Plan in support of the application.  The Business
Plan has been produced by the applicant, contains limited information, features no
independent financial verification and the current or projected level of income is not of
a sustainable level to justify residential accommodation.  This statement also refers to
accounts, which again have not been submitted.  However, as the current business is
unauthorised, the robustness of the Business Plan is not a determining factor in the
assessment of the application. 
10.8. In summary, it is considered that there is no justification in policy terms for a new
dwellinghouse at this location within the Green Belt.  There are no material
considerations which would justify a departure from the development plan at this site
to permit the erection of a new dwellinghouse contrary to policy.  The proposal is
considered to be contrary to SLLDP2 Policies 4 and GBRA10 and NPF4 Policy 8. 
10.9 Climate Change
Policies 1 and 2 of NPF4, and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of climate
change.  It is noted the plans include proposals for renewable technologies at the new
dwelling.  However, given that there is no justification for a new dwellinghouse in the
Green Belt, the dwellinghouse would not be sustainably located and it would lead to
additional private car trips with their associated greenhouse gas emissions.  This
would adversely impact upon the wider climate and the proposal would therefore fail
to comply with Policies 1 and 2 of NPF4 or with Policy 2 of SLLDP2. 
10.10 Layout, Siting and Design
In terms of the design of the proposal, the relevant policies of NPF4 to be considered
are Policies 14 – Design, quality and place and 16 – Quality homes.  These policies
require development proposals to be designed to improve the quality of an area and
supports proposals where they are consistent with the six qualities of successful
places; healthy, pleasant, connected, distinctive, sustainable, and adaptable.  SLLDP2
Policies 5 - Development Management and Placemaking and GBRA1 – Rural Design
and Development state that development proposals should take account of and be
59

Page 60

integrated within the local context and built form, provide suitable access, parking and
have no adverse implications for public safety.  New development should also have
no significant adverse impacts on the local community. 
10.11. Whilst the elevations and external materials of the proposed dwelling are considered
to be acceptable, and would not significantly impact on neighbouring amenity, the
building position, site layout and unclear means of access are unacceptable.  The
erection of a dwelling within the green belt, contrary to the policy designed to preserve
the green belt, is not considered to be characteristic of a sustainable place.  Given its
location is removed from any main settlements, the proposal is also not considered to
be connected.  It is remote from services and facilities and would require the occupants
to travel by private vehicle either to East Kilbride or Strathaven for activities including
retail and leisure.  Roads, Transportation and Fleet Services objected to the proposal
due to insufficient details on access dimensions, lack of turning facilities, visibility
splays and details on how the stables will be accessed.  The proposal is therefore
considered contrary to Policies 14 and 16 of NPF4 and Policies 5 and GBRA1 of
SLLDP2. 
10.12. Technical Matters 
DM15 and DM16 of the SLLDP2 seek to ensure appropriate supply of water and
wastewater services.  The application proposes connection to the public water supply. 
Private treatment is proposed for wastewater with a Klargester Bio-Disk sewage
treatment system with outflow to soakaway. 
10.13. Conclusion 
Given the above, it is considered that the proposed development has not been
appropriately justified in land-use policy terms and that there are no material
considerations which could justify a new dwellinghouse at this site.  The applicant has
failed to demonstrate that the proposal would not have road safety implications.  The
proposal would also be unsustainable in the Green Belt, failing to address climate
concerns and generating increased private car trips and their associated greenhouse
gasses and emissions.  As such, the proposal would not comply with the relevant
policies of the adopted development plan (NPF4 and SLLDP2) and it is therefore
recommended that planning consent is refused. 
11 Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 8 - Green Belts of National Planning
Framework 4 (2023) as it does not meet the criteria set out in the policy for
Green Belt development and, as such, fails to encourage, promote and facilitate
compact urban growth and use the land around our towns and cities
sustainably. 
02. The proposal is contrary to Policy 4 of the South Lanarkshire Local
Development Plan 2 (2021) as it is not for agricultural, forestry, recreation or
other uses generally appropriate to the countryside and it has not been
appropriately justified in terms of being development which would require to be
located within the Green Belt.  
60

Page 61

03. The proposal does not meet the requirements of Policy GBRA10 of the South
Lanarkshire Local Development Plan 2 (2021) as the related business at the
site is unauthorised and insufficient evidence has been submitted to justify the
requirement of a residential dwelling at this location. 
04. The proposal is contrary to Policy 5 of the South Lanarkshire Local
Development Plan 2 (2021) as insufficient details have been submitted to
assess if the proposal would have implications on road safety. 
05. The proposal would be contrary to Policy 14 – Design, quality and place of
National Planning Framework 4 (2023) as it is inconsistent with the qualities of
either a Connected or a Sustainable place. 
06. The proposal would be contrary to Policy 16 - Quality Homes of National
Planning Framework 4 (2023) as it does not constitute the delivery of high
quality homes in the right locations as set out in the policy criteria. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/1185 | Erection of single storey dwellinghouse and relocation of existing stables for
equestrian business | Knowehead Farm Blackburnmill Highway Strathaven ML10 6RP 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
61

Page 62

62

Page 63

Report
Agenda Item 
Amended
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1282
Proposal:  Section 42 application to vary Condition 18 of planning permission
P/21/1100 to amend position of substation associated with wind
turbine 
Site Address:  Land at West Dykes
Muirkirk Road
Strathaven
ML10 6RF 
Applicant:  Clean Earth Energy Ltd
Agent:  N/A
Ward:  05 Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News 6th November 2024
Development Plan
Compliance: 
Yes 
Departures:  N/A
Recommendation:  Grant subject to conditions
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
7
63

Page 64

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under the
South Lanarkshire Council Scheme of Delegation (2024) as more than 5 letters of
objection have been received in respect of the proposal. 
2. Site Description
2.1. The application site, extending to approximately 1.3 hectares is located on sloping
farmland associated with West Dykes Farm approximately 1km to the south of Muirkirk
Road (B743) and 5.5km to the south-west of Strathaven.  The site is generally
surrounded by agricultural land with a small number of residential properties in the
vicinity. 
3. Description of Proposed Development
3.1. This proposal relates to a Section 42 application to vary Condition 18 of planning
permission P/21/1100.   
3.2. Planning permission P/21/1100, granted 22 October 2021, was also as a Section 42
application which sought to amend Condition 1 of planning permission P/19/1829
(Erection of wind turbine up to a maximum blade tip height of 149.9m with associated
infrastructure including crane pad, access track and electrical housing) to extend the
time period and allow micrositing of the turbine. 
3.3. Condition 18 of planning permission P/21/1100 states:- 
The wind turbine, electrical housing unit, areas of hardstanding and tracks, hereby
approved, shall be erected and installed in the position indicated as shown on
approved Location Plan drawing reference CE5439-LP-01-1-5000.  At least 1 month
prior to the construction of the turbine foundation a variation of the indicated position
of the turbine on the approved drawing shall be notified on the following basis:- 
(a) If the variation is less than 25 metres it shall only be permitted following the
submission of the new location to the Planning Authority in an acceptable,
scaled plan form
(b) if the variation is of between 25 metres and 50 metres it shall only be permitted
following written approval of the Planning Authority in consultation with
NatureScot 
The said provisions relating to variation shall not have the effect such that any
variation will:- 
- bring a turbine within 1000m of a non-involved residential property
- bring a turbine outwith the planning application boundary 
3.4. The proposal seeks to change the location of the substation associated with the
consented turbine and therefore vary the plan referenced in the above condition to
CE5439-LP-02-1-5000. 
4. Relevant Planning History
4.1. Planning permission was refused for the erection of wind turbine up to a maximum
blade tip height of 149.9m with associated infrastructure including crane pad, access
track and electrical housing at the site under application P/19/1829 in August 2020. 
However, following appeal, this was authorised by a Reporter of the Scottish
Government in December 2020. 
64

Page 65

4.2. As noted above, a Section 42 application to amend condition 1 of P/19/1829 and allow
micrositing was subsequently approved by the Council in October 2021. 
5. Supporting Information 
5.1 In support of the planning application, the following has been submitted:- 
 A supporting statement
 Letter clarifying location of substation 
6. Consultations
6.1. None required. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
10 representations have been received (10 objections).  The issues raised are
summarised as follows:- 
 Proximity of substation to residential properties
 Object to approved turbine
 Impact of associated turbine and turbine development in general on residents in
relation to noise, shadow flicker, health risks, safety, loss of value
 Impact of associated turbine and turbine development on the environment and
wildlife
 Cumulative impact
 Insufficient access
 Lack of community consultation from developer
 Lack of information on plans 
The above issues are considered in the assessment below.  These letters are
available for inspection on the planning portal. 
8 Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy.  It sets
out spatial principles, regional priorities, national developments, and national planning
policy.  NPF4 supports the planning and delivery of sustainable places, liveable places
and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 11 - Energy
 Policy 14 - Design, quality and place 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will also assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies:-   
65

Page 66

SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change 
 Policy 4 – Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking 
 Policy 18 – Renewable Energy 
SLLDP2 Volume 2 Policies
 Policy GBRA1 – Rural Design and Development
 Policy DM1 - New Development Design 
 Policy RE1 – Renewable Energy 
9 Guidance
9.1. None applicable.   
10. Assessment and Discussion
10.1. Introduction
Permission is sought to vary Condition 18 of planning permission P/21/1100 to allow
repositioning of the substation associated with the wind turbine approved at the site. 
This involves relocating the substation from one side of the crane pad to the other. 
The determining issues in the consideration of this application are its compliance with
national policy and local development plan policy. 
10.2. Principle of Development
The application site is located within the rural area as identified under SLLDP2.  As
the site benefits from planning permission for a wind turbine of up to 149.9 metres in
height to blade tip, as authorised by a Reporter of the Scottish Government under
application P/19/1829, and subsequent Section 42 application P/21/1100, the principle
of the development has already been established and therefore complies with Policy
11 – Energy of NPF4, and Policies 18 and RE1 – Renewable Energy of SLLDP2.  The
purpose of this application is therefore not to reassess the acceptability of the wind
turbine development, but to establish if the repositioning of the substation is
acceptable and, as such, the amendment of Condition 18. 
10.3. Layout, Siting and Design
Policy 14 - Design, Quality and Place of NPF4 aims to encourage, promote, and
facilitate well designed development that makes successful places by taking a design-
led approach and applying the Place Principle.  Policy 5 – Development Management
and Placemaking of SLLDP2 advises that to ensure development takes account of the
principles of sustainable development, all proposals require to be well designed and
integrated with the local area.  Proposals should have no significant adverse impacts
on the local community and the environment.  Where appropriate, proposals should
include measures to enhance the environment.  Policy DM1 – New Development
Design of SLLDP2 also requires development to promote quality and sustainability in
design and layout. 
10.4. The submitted plans indicate that the substation would be relocated a distance of
approximately 25 metres from approved position to the south-west of the crane pad to
a new location on the northeast of the crane pad.  As this will have no impact on
residential properties or have any significant visual impact on the overall development,
the proposal is considered acceptable. It is therefore considered that the proposal
complies with Policy 14 of NPF4 and Policies 5 and DM1 of SLLDP2.  
66

Page 67

10.5. Policy 1 – Tackling the climate and nature crises and Policy 2 – Climate mitigation of
NPF4, along with Policy 2 of SLLDP2, seek to encourage, promote and facilitate
development that addresses the global climate emergency and nature crisis, and
which minimises emissions and adapts to the current and future impacts of climate
change.  As the proposal relates to an approved renewable energy development, the
proposal is not considered to raise any issues that conflict with the aims of Policy 1 or
2 of NPF4, or Policy 2 of SLLDP2. 
10.6. Representations 
The main issues raised through representation to this proposal relate to the principle
of wind turbine development at this location.  As outlined above, this application is not
a reassessment of the acceptability of the turbine itself. 
10.7. Several representations have also raised concern that the proposal relates to a
substation located off the B743 and that the plans do not accurately represent this.  In
response to this, the applicant has provided a supplementary statement confirming
that the proposal relates to the repositioning of the substation adjacent to the crane
pad and therefore does not relate to the existing substation located just off the B743. 
The Council considers that the submitted plans do show the location of the substation
as approved, as well as its proposed new location. 
10.8. In relation to a lack of community consultation from the applicant, the proposal relates
to an approved turbine.  There is no formal requirement for the applicant to carry out
community consultation in this instance. 
10.9. Conclusion 
The Section 42 application to vary Condition 18 of planning permission P/21/1100 is
considered to be acceptable and the proposal is considered to comply with the
provisions of the Development Plan.  It is recommended that Planning permission be
granted subject to the attached conditions. 
10.10. A Section 42 application requires all other conditions, if relevant, to be reattached to
any new permission.  As such, all conditions have been reattached and Condition 18
amended. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to the following conditions:- 
01. The permission hereby granted is for a temporary period only and shall expire 30 years
from the date of this decision.   
Reason: To enable the permission to be reviewed at the end of the permitted period
in the light of the circumstances pertaining at that time. 
02. On the expiry of 30 years from the date of the permission or in the event that the
turbine becomes obsolete or redundant before that date, it shall be removed along
with its associated hardstandings and the site reinstated in accordance with the
decommissioning plans approved under the terms of condition 4 below within six
months.   
Reason: To ensure the proper restoration of the site, in the interests of the visual
amenity of the area.  
67

Page 68

03. Prior to the commencement of the development, a guarantee to cover all site
restoration and aftercare liabilities imposed on the expiry of this permission will be
submitted for the written approval of the planning authority.  Such guarantee must:-   
i.  be granted in favour of the planning authority;
ii.  be granted by a bank or other institution which is of sound financial standing
and capable of fulfilling the obligations under the guarantee;
iii.  be for an amount which covers the value of all site restoration and aftercare
liabilities as determined by the planning authority at the commencement of
development;
iv.  contain indexation provisions so that all site restoration and aftercare liabilities
as determined at the commencement of development shall be increased on
each anniversary of the date of this permission by the same percentage
increase in the General Index of Retail Prices (All Items) exclusive of mortgage
interest published by or on behalf of HM Government between the date hereof
and such relevant anniversary;
v.  come into effect on or before the date of commencement of development, and
expire no earlier than 12 months after the end of the aftercare period.   
No work shall begin at the site until (1) written approval of the planning authority has
been given to the terms of such guarantee; and (2) thereafter the validly executed
guarantee has been delivered to the planning authority.  In the event that the
guarantee becomes invalid for any reason, no operations will be carried out on site
until a replacement guarantee completed in accordance with the terms of this condition
is lodged with the planning authority.   
Reason: To ensure that adequate financial provision is available at all times to enable
the satisfactory restoration of the site. 
04. Before any work starts on site, details of the decommissioning and removal of the
turbine hereby approved, together with the removal of the associated hardstandings,
control buildings and access tracks, and the restoration of the site shall be submitted
to the planning authority.  No work shall start on site until these details have been
approved in writing by the planning authority.  This work shall be carried out in
accordance with the approved decommissioning and restoration scheme unless
otherwise agreed in writing by the planning authority.   
Reason: To ensure that the development is decommissioned and the site restored to
the satisfaction of the planning authority. 
05. Before any work starts on the site, a Construction Environmental Management Plan
(CEMP) shall be submitted to and approved in writing by the planning authority.  The
CEMP shall include the following provisions:- 
a) a pollution prevention and control method statement, including arrangements for
the storage and management of oil, fuel and other chemicals on the site; 
b) soil storage and management measures; 
c) a peat management plan if necessary; 
d) a water and drainage management plan for all groundwater, surface and waste
water; 
e) details of any watercourse crossings; 
f) proposals for monitoring the site during construction operations, including any tree
felling required, to ensure that they cause no harm to protected species.   
The development shall be implemented thereafter in accordance with the approved
CEMP unless otherwise approved in writing by the planning authority. 
68

Page 69

Reason: To ensure that all construction operations are carried out in a manner that
minimises their impact on the water environment and wildlife. 
06. There shall be no development on site until a Traffic Management Plan has been
submitted to and approved in writing by the planning authority, in consultation with the
roads authority.  The plan shall include details of the number and type of all vehicles
to be used during the delivery and construction of the turbine and its infrastructure,
including for the removal of excavated material from the site; the proposed routes to
be used; swept path analysis for the longest delivery vehicles and the total weights
and individual axle loads of all heavy loads; the measures required for the transport of
abnormal loads, including any temporary signage; and provisions for the reinstatement
of or repair of road surfaces, verges or roadside features, by the operator, that have
been damaged by construction traffic by means of pre- and post-development
condition surveys (alternatively an upfront payment in lieu of extraordinary damages
can be agreed).  The plan shall also include the following information for the intended
turbine transportation route:-   
a) proposed timings and methodology; 
b) a swept path analysis detailing over-run areas for specialist loads, clarification of
land agreements where improvements are required to third party land to facilitate road
infrastructure and/or junction visibility splays, including details of local improvements
in the public road geometry and strengthening in order to provide the required
transport corridor for these loads; 
c) all temporary works including relocation of signs, advanced warning signing details,
guardrails, bollards, street furniture and all temporary measures; 
d) any alteration to the public road network; 
e) details of the construction compound including staff car parking and turning
arrangements; and 
f) details of appropriate cleaning systems to be put in place within the site to ensure
mud and debris is not deposited on the public road.   
The Traffic Management Plan, as approved, shall thereafter be implemented in full.   
Reason: In the interest of public safety, and to ensure that all traffic movements in
association with the construction of the turbine can be carried out with the minimum
inconvenience to other road users. 
07. Before the development hereby approved is completed or brought into use, visibility
splays of 2.5 metres by 120 metres to the vehicular access, measured from the road
channel shall be provided and everything exceeding 0.9 metres in height above the
road channel level shall be removed from the sight line areas and thereafter nothing
exceeding 0.9 metres in height shall be planted, placed or erected within these sight
lines.   
Reason: In the interest of public safety. 
08. Before the development hereby approved is completed or brought into use, a turning
space shall be provided within the site to enable vehicles to enter and leave the
application site in forward gears at all times.   
Reason: In the interest of public safety. 
09. The first 30 metres of the access (measured from the edge of the carriageway) shall
be surfaced, sealed and trapped to prevent any detritus, material or water leaving the
access and entering the public road. 
69

Page 70

Reason: In the interests of traffic safety. 
10. All external colours shall be agreed in writing by the planning authority prior to the
commencement of works.   
Reason: In the interests of protecting the visual amenity of the area. 
11. In the event that an alternative turbine other than that shown on the approved planning
drawings is sourced during the tendering process the alternative turbine will require
the written approval of the Planning Authority and require to meet the stipulated noise
limit conditions below.   
Reason: To safeguard the amenity of the area. 
12. The turbine shall not display any logo, sign or advertisement without express consent
from the planning authority unless such a sign is required for health and safety or
operational reasons.   
Reason: To safeguard the amenity of the area. 
13. The cumulative day time noise (7am to 11pm) and cumulative night time noise (11pm
to 7am) from the wind turbine as it contributes to any noise sensitive receptor shall be
a minimum of 10dB below the cumulative emissions of any other previously consented
wind farm developments operating within their operational allowance.  This is based
on Section 5 of the West Dykes Wind Turbine ETSU-R-97 Assessment for the planning
application of 6 December 2019.   
Reason: To minimise noise disturbance to adjacent occupants. 
14. If the tonal noise emitted by the development exceeds the threshold of audibility by
6.5dB or more, then the acceptable noise specified above shall be reduced by 5dB,
always providing that the definition of audibility for the purposes of this condition shall
be as described in 'The Assessment and rating of Noise from Wind Farms (ETSU-R-
97).   
Reason: To minimise noise disturbance to adjacent occupants. 
15. At the reasonable request of the planning authority and following a complaint to it
relating to noise emissions arising from the operation of the wind turbine, the wind
turbine operator shall appoint an independent noise consultant, whose appointment
shall require to be approved by the planning authority, to measure the level of noise
emission from the wind turbine at the property to which the complaint related.  The
measurement and calculation of noise levels shall be undertaken in accordance with
ETSU-R-97 having regard to paragraphs 1 to 3 and 5 to 11 inclusive of the schedule
on Pages 95 to 97 inclusive, and Supplementary Guidance Notes to the Planning
Obligation on pages 99 to 109 of ETSU-R-97.  Where an assessment of any noise
impact is, in the opinion of the planning authority acting reasonably, found to be in
breach of the noise limits, the wind turbine operator shall carry out mitigation measures
to remediate the breach so caused. Details of any such mitigation measures required
are to be submitted to the planning authority for prior approval.   
Reason: To protect residential properties from noise disturbance.  
70

Page 71

16. In the event that noise complaints are made about the operation of the turbine, the use
of the turbine shall be discontinued and the complaint investigated in accordance with
the procedures outlined in condition 15 above.  The turbine shall not be brought back
into use until the complaint has been resolved to the satisfaction of the planning
authority, including the implementation of any necessary mitigation measures.   
Reason: To protect residential properties from noise disturbance. 
17. The turbine hereby approved shall be fitted with MOD accredited aviation safety
lighting in accordance with the Civil Aviation Authority, Air Navigation Order 2016 and
thereafter this lighting shall be maintained to the satisfaction of the planning authority.   
Reason: In the interests of aviation safety. 
18. The wind turbine, electrical housing unit, areas of hardstanding and tracks, hereby
approved, shall be erected and installed in the position indicated as shown on
approved Location Plan drawing reference CE5439-LP-02-1-5000.  At least 1 month
prior to the construction of the turbine foundation a variation of the indicated position
of the turbine on the approved drawing shall be notified on the following basis:- 
(a) If the variation is less than 25 metres it shall only be permitted following the
submission of the new location to the Planning Authority in an acceptable,
scaled plan form
(b) if the variation is of between 25 metres and 50 metres it shall only be permitted
following written approval of the Planning Authority in consultation with
NatureScot  
The said provisions relating to variation shall not have the effect such that any
variation will:- 
- bring a turbine within 1000m of a non-involved residential property   
- bring a turbine outwith the planning application boundary   
Reason:  In the interests of amenity and in order to retain effective planning control. 
19. Within 3 months of commissioning the approved wind turbine the applicant shall submit
to the Planning Authority an "as built plan" at an appropriate scale indicating the
location of any track, turbine, crane pad and grid building within the development.   
Reason:  In order to retain effective planning control. 
20. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
12 Reason for Decision
12.1. The variation to Condition 18 is considered to be acceptable and the proposal will not
result in any significant adverse amenity, environmental or safety impacts, and
therefore complies with the relevant policies of the adopted National Planning
Framework 4 and the adopted South Lanarkshire Local Development Plan 2.  
71

Page 72

David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:-
P/24/1282 | Section 42 application to vary Condition 18 of planning permission P/21/1100 to amend
position of substation associated with wind turbine | Land At West Dykes Muirkirk Road Strathaven
ML10 6RF 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk  
72

Page 73

73

Page 74

74

Page 75

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1373
Proposal:  Erection of dwellinghouse 
Site Address:  Newark Farm
Land 135m Northwest of Newark Mill
Whitecraigs Highway
Glassford
Strathaven
ML10 6TX 
Applicant:  Mr Thomas Miller 
Agent:  Planning Services UK
Ward:  05 Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News – 4th December 2024
Development Plan
Compliance: 
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
8
75

Page 76

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee as the Head
of Planning and Regulatory Services in consultation with the Chair of the Planning
Committee has determined it raises policy issues meriting consideration by the
Planning Committee. 
2. Site Description
2.1. The application site is an agricultural field located within the designated Green Belt,
approximately 800 metres west of Glassford and 80 metres northwest of Newark Mill. 
The site is relatively flat agricultural land and is bound to the north and south by mature
trees, to the west by agricultural land and to the east by the grounds of Newark Mill. 
The site is roughly triangular in nature, measuring 0.7Ha. 
2.2. The proposed property would be accessed from the road to Newark Mill, off
Whitecraigs Highway. 
3. Description of Proposed Development
3.1. The proposal seeks the erection of a two-storey, 6-bedroom dwellinghouse which
would be accessed via a new 125 metre driveway.  The property would be set within
substantial grounds.  Two parking spaces are proposed at the front of the property
with an additional parking area to the north of the site. 
3.2. The proposed dwellinghouse would contain a large open-plan kitchen/living/dining
space, lounge, garden room, snug, utility, boot room, dog room and WC on the ground
floor.  The upper floor of the property would contain six bedrooms (four with en-suite)
and a bathroom.  The Design Statement submitted with the application advises that
the proposed external materials would be of a traditional nature including stone and
timber. 
4. Relevant Planning History
4.1. There is no relevant planning history for the site. 
5. Supporting Information 
5.1. The agent submitted a Planning Statement in support of the proposal.  The report puts
forward the view that the proposal complies with development plan policies.  This has
been considered as part of the assessment of the application, below. 
6 Consultations
6.1.  Roads Development Management – No objection subject to conditions relating to
visibility splays, electric vehicle (EV) charging and parking. 
Response:  Noted.  These matters could be addressed through conditions and
advisory notes if the application was to be approved. 
6.2.  Environmental Services – No objection to the proposal.  Requested advisory notes
relating to construction noise, nuisance, and a note about the role of SEPA. 
Response:  Noted.  These matters could be addressed through the inclusion of
advisory notes on the decision notice if the application was to be approved. 
6.3. Roads Flood Risk Management – No response.
Response:  Noted. 
7  Representations
7.1. Following the statutory period of neighbour notification and advertisement, no valid
representations have been received. 
76

Page 77

8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 (2023) 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 8 - Green belts
 Policy 14 - Design, quality and place 
 Policy 15 - Local living and 20 minute neighbourhoods 
 Policy 16 - Quality homes 
8.3.  South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will also assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan (SLLDP2).  In this regard, the application site and associated
proposals are affected by the following policies:- 
SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking 
SLLDP2 Volume 2 Policies 
 Policy GBRA1 - Rural Design and Development
 Policy GBRA9 - Consolidation of Existing Building Groups
 Policy DM15 - Water Supply
 Policy DM16 - Foul Drainage and Sewerage 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
Full planning permission is sought for the erection of a two storey dwellinghouse.  The
main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development, its layout, siting and design,
and an assessment of technical matters.  The relevant policies set out above will be
assessed in turn alongside any relevant material considerations. 
10.2. Principle of Development
In terms of the principle of the development, as the site is located within the designated
Green Belt, NPF4 Policy 8 - Green Belts applies.  This policy sets out the types of
development that would be supported in the Green Belt which includes:- 
77

Page 78

 development associated with agriculture, woodlands, and forestry
 accommodation for an essential worker
 horticulture
 outdoor recreation, play and sport, leisure and tourism uses
 flood risk management proposals
 essential infrastructure or new cemetery provision
 mineral operations and renewable energy
 intensification of established uses, including extensions to an existing building
where that is ancillary to the main use
 the reuse, rehabilitation and conversion of historic environment assets
 one-for-one replacements of existing permanent homes 
Developments in these categories are also required to demonstrate a specific
locational need, that would not undermine the purpose of the Green Belt and would
require to be compatible with the surrounding established countryside and landscape
character. 
10.3. SLLDP2 Policy 4 - Green Belt and Rural Area would also be relevant to this proposal. 
This states that the purpose of the Green Belt is to; direct development to the most
appropriate locations and support regeneration, protect and enhance the character,
landscape setting and identity of the settlement, and protect and provide access to
open space.  Development which does not require to locate in the countryside will be
expected to be accommodated within the settlements identified on the proposals map. 
10.4. Notwithstanding policy GBRA1, there are several policies within SLLDP2 that consider
new-build housing in the green belt, however, none of them are considered to be
applicable to this proposal.  The applicant has sought to set out a case in the Planning
Statement that the proposal could be a consolidation of an existing building group,
however, the nearest building is 80 metres from the proposed application site and the
proposed dwelling would be around 100m from this existing dwelling.  As the site is
not part of an existing group no argument can be made that it would represent a
consolidation and the proposal would not comply with SLLDP2 Policy GBRA9. 
10.5. No specific locational justification has been provided for the erection of a
dwellinghouse at this location within the Green Belt.  In policy terms, it is considered
that there is no justification for the erection of a new dwellinghouse within the Green
Belt at this location.  NPF4 Policy 8 provides a list of appropriate Green Belt uses, as
outlined above, with limited new-build residential development linked to essential farm
workers/key workers, retired farm workers or the one-for-one replacement of existing
residential dwellings only. 
10.6. With regards to the case made in the Planning Statement that the proposal would be
a consolidation of an existing building group, the site would not comply with SLLDP2
Policy GBRA9 as the building group referred to is located 80 metres from the proposed
application site and not connected to this group of buildings. 
10.7. The erection of a dwelling at this location would not contribute to local living and, in
summary, it is considered that there is no justification in policy terms for a new six
bedroom dwellinghouse at this location within the Green Belt.  There are no material
considerations which would justify a departure from the development plan at this site
to permit the erection of a new dwellinghouse contrary to policy and to do so would
risk undermining the purpose of the Green Belt.  As such, the proposal is considered
to be contrary to NPF4 Policies 8 and 15 and with SLLDP2 Policies 4 and GBRA9. 
78

Page 79

10.8. Climate Change
Policies 1 and 2 of NPF4, and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of climate
change.  While the proposal would include energy efficient features and would be
relatively close to sustainable transport options, there is no justification for a new
dwellinghouse in the Green Belt and it is still considered that a six-bedroom dwelling
would lead to additional private car trips with their associated greenhouse gas
emissions.  This would adversely impact upon the wider climate and the proposal
would therefore fail to comply with Policies 1 and 2 of NPF4 or with Policy 2 of SLLDP2. 
10.9. Layout, Siting and Design
In terms of the design of the proposal, the relevant policies of NPF4 to be considered
are Policies 14 – Design, quality and place and 16 – Quality homes.  These policies
require development proposals to be designed to improve the quality of an area and
supports proposals where they are consistent with the six qualities of successful
places; healthy, pleasant, connected, distinctive, sustainable, and adaptable.  SLLDP2
Policies 5 - Development Management and Placemaking and GBRA1 – Rural Design
and Development state that development proposals should take account of and be
integrated within the local context and built form, address the six qualities of
placemaking and not be isolated or sporadic.  New development should also have no
significant adverse impacts on the local community. 
10.10. The physical characteristics of the proposed dwellinghouse are not a material
consideration in this instance as the principle is unsupportable.  However, the scale
and design of the proposal is not considered to reflect the Green Belt setting and the
submitted drawings do not even specify external materials.  As the proposed dwelling
is within the Green Belt without a locational need, it cannot be considered as a
sustainable location.  The proposed dwellinghouse is not connected to the local
buildings and, as such, is considered sporadic development.  It is therefore considered
that the proposal is contrary to Policy 14 of NPF4 and Policies 5 and GBRA1 of the
SLLDP2. 
10.11 Technical Matters
DM15 and DM16 of the SLLDP2 seek to ensure appropriate supply of water and
wastewater services.  No details of the water connection proposals were submitted
with the application.  Private treatment is proposed for wastewater with a septic tank
sewage treatment system with outflow to soakaway. 
10.12. Other Issues
The Planning Statement submitted by the agent states the proposal aligns with key
national and local planning objectives:- 
 Meeting Local Housing Needs: The increase in Glassford’s population indicates
a demand for rural housing, which this proposal addresses by adding a dwelling
within an established cluster, thus maintaining Green Belt openness. 
 Supporting Sustainable Development: The dwelling’s design aligns with
sustainability standards set by NPF4 and SLLDP2. 
 Respecting Rural Character and Green Belt Openness: The proposal preserves
the landscape's continuity by integrating with the established cluster minimising
visual and spatial disruption to the Green Belt. 
 Land is not Prime Agricultural land.  The land is classified as Class 3.2 - Land
capable of average production, though high yields of barley, oats, and grass can
be obtained.  Grass leys are common.  
79

Page 80

10.13. As detailed above, the required justification for a new dwelling in the Green Belt, set
out in the NPF4 and the SLLDP2 has not been provided.  The site is not within the
identified settlement of Glassford and for a pedestrian there is approximately a 1.4km
walk along unlit roads with no public footways between Glassford and the site.  The
proposal is not development associated with agriculture, woodlands, and forestry, is
not connected to an existing building group and does not provide accommodation for
an essential worker.  The argument that a two-storey house better preserves
landscape character than the existing field is without merit and its development would
not minimise visual disruption in the green belt.  The agricultural land classification is
not a material consideration given that the principle of the development is
unsupportable. 
10.14. Conclusion 
Given the above, it is considered that the proposed development has not been
appropriately justified in policy terms with regards to its Green Belt location and that
there is therefore no justification for a new dwellinghouse at this site.  The proposal
would also have an adverse impact upon the wider amenity of the area, being an
unjustified Green Belt development and sited in a manner which does not reflect the
rural character.  The proposal would also be unsustainable in the Green Belt, failing
to address climate concerns and generating increased private car trips and their
associated greenhouse gasses and emissions.  As such, the proposal would not
comply with the relevant policies of the adopted development plan (NPF4 and
SLLDP2) and it is therefore recommended that planning consent is refused. 
11.   Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 8 - Green Belts of the National
Planning Framework 4 (2023) as it does not meet the criteria set out in the policy
for Green Belt development and, as such, fails to encourage, promote and
facilitate compact urban growth and use the land around our towns and cities
sustainably. 
02. The proposal is contrary to Policy 4 of the South Lanarkshire Local
Development Plan 2 (2021) as it is not for agricultural, forestry, recreation or
other uses generally appropriate to the countryside and it has not been
appropriately justified in terms of being development which would require to be
located within the Green Belt. 
03. The proposal is contrary to Policy 5 of the South Lanarkshire Local
Development Plan 2 (2021) as it does not take account of the principles of
sustainable development and does not include measures which enhance the
environment or address the six qualities of placemaking. 
04. The proposal does not meet the requirements of Policy GBRA9 of the South
Lanarkshire Local Development Plan 2 (2021) as the proposal is not within a
reasonable distance of the existing nearby building group. 
05. The proposal would be contrary to Policy 14 – Design, quality and place of
National Planning Framework 4 (2023) as it is inconsistent with the qualities of
either a Connected or a Sustainable place.  
80

Page 81

06. The proposal would be contrary to Policy 16 - Quality Homes of the National
Planning Framework 4 (2023) as it does not constitute the delivery of high
quality homes in the right locations as set out in the policy criteria. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/1373 | Erection of dwellinghouse | Land 135M Northwest Of Newark Mill Whitecraigs
Highway Glassford Strathaven ML10 6TX 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
81

Page 82

82

Page 83

Report
Agenda Item 
Report to: Planning Committee 
Date of Meeting: 4 March 2025  
Report by: Executive Director (Community and Enterprise
Resources) 
Reference no:  P/24/1421 
Proposal:  Erection of 6 two storey houses (two terraced blocks) and a 3 storey
block of 18 flats with associated parking, landscaping and associated
services 
Site Address:  Land Enclosed by High Blantyre Road, Glenlee Street and Reid
Street, Hamilton 
Applicant:  JR Group Ltd 
Agent:  Mast Architects
Ward:  17 - Hamilton North and East
Application Type:  Full planning permission
Advert Date:  Hamilton Advertiser - 19 December 2024 
Development Plan
Compliance: 
Yes 
Departures:  N/A 
Recommendation:  Grant subject to conditions
Legal Agreement:  No 
Direction to
Scottish Ministers 
No 
9
83

Page 84

1. Reason for Report
1.1. This application is being presented to the Planning Committee for determination as
the proposal has received more than 5 objections. 
2. Site Description
2.1. The application site extends to approximately 0.52ha and is situated in an established
residential area, within the settlement boundary of Hamilton.   
2.2. The site relates to an area of vacant land which previously accommodated St
Cuthbert’s Church and associated buildings, including a residential dwelling, a
detached double garage and landscaping.  The buildings were demolished in 2023
and the site cleared.   
3. Description of Proposed Development
3.1. Planning permission is sought for the erection of 6 two storey houses (two terraced
blocks) and a 3 storey block of 18 flats with associated parking, landscaping and
associated services at land enclosed by High Blantyre Road, Glenlee Street and Reid
Street, Hamilton. 
3.2. The terraced properties and flatted units are for social rent with the end user being
South Lanarkshire Council.  Externally, the properties are proposed to be finished in
a combination of facing brick, cladding, glazing panels and concrete roof tiles.   
3.3. The proposal includes vehicular access to the development from Glenlee Street and
access to parking provision from Reid Street.  In addition, the proposal includes
pedestrian accesses from Reid Street, High Blantyre Road and Glenlee Street and
footpath links throughout the site.  The development includes 32 off street parking
spaces associated with the residential units.  The proposal also includes a new
landscaping scheme and the retention of the existing boundary walls with a reduction
in height. 
3.4. Following discussions with the Planning Service, during the planning application
process some minor changes were undertaken to the design of the flatted
development.  These changes included alterations to the material configuration of the
flatted development and the lowering of the ridge line on parts of the block.  In addition,
the initially proposed timber fence adjacent to the parking area has been replaced with
metal railings.   
4. Relevant Planning History
4.1. There is no relevant planning history relating to this site.   
5. Supporting Information 
5.1. In support of the planning application, the following has been submitted:- 
 Design and Access Statement
 Solar Study 
 Roads Comments Response Document 
 A letter confirming the end user of the site 
6. Consultations
6.1. Environmental Services - No objection to the proposals, subject to advisory notes
relating to noise and preparation of an action plan.  
Response: Noted.  
84

Page 85

6.2. Roads Development Management Team - No objection to the proposed development,
subject to conditions relating to the provision of a dropped kerb access and the
submission of a Construction Phase Traffic Management Plan.
Response: Noted. 
6.3. Housing Services – Advise the site is identified in the South Lanarkshire Strategic
Hosing Investment Plan (SHIP).
Response: Noted. 
7.   Representations
7.1. Following the statutory period of neighbour notification and advertisement, 57
representations (55 objections) have been received.  The issues raised are
summarised as follows:- 
Design Issues 
 The proposed three storey block of flats is out of keeping with the character and
architectural style of Reid Street and the surrounding area. 
 Due to the level changes the flats will appear four storeys in height. 
 The proposal is not sympathetic to the Conservation Area.  
 The proposed materials are not in keeping with the surrounding area. 
 The design does not accord with the Local Development Plan policies.
 The proposal will result in overdevelopment of the site. 
Amenity Issues 
 The flats will result in overlooking over adjacent properties and garden grounds
of the properties on Reid Street. 
 The new flats will create privacy issues.
 The proposal will block sunlight and result in overshadowing of our properties,
affecting our quality of life.
 The new residential accommodation will result in noise, light and air pollution for
existing residents. 
 The properties should be rotated to face Glenlee Street as this will minimise
overlooking. 
Natural Environment
 The proposal will have an adverse impact on wildlife and loss of habitat.
 The development will result in the loss of a green space. 
 The existing trees on the site were there for 130 years and have been removed.
 Concern regarding the impact of the trees identified in the landscaping scheme
as they mature. 
Roads Related Matters
 There are only 32 spaces proposed, which is not enough parking for the
development as some households will have 2 and 3 cars. 
 The parking provision does not accord with the Councils Residential
Development Guide. 
 Concern regarding the parking spaces in Reid Street as this will result in less off-
street parking in the area. 
 There have been accidents at the surrounding junctions and the development will
result in increased road safety issues. 
 The area is already congested with traffic and the development will exacerbate
this issue.
 The proposal will impact on the safety of children walking to school.
85

Page 86

 The development will result in residents having difficulty accessing their homes
and create unsafe traffic conditions.  
 Concern regarding the impact of the development on High Blantyre Road as it is
an arterial route through Hamilton.  
 The new kerb parking regulations are causing issues which will be made worse
by this development.
 Road markings should be re-instated in the surrounding area. 
Other Matters Raised
 The development of more housing will put pressure on existing schools and GP
surgeries. 
 Greater infrastructure is required for the development to progress. 
 The increase in hard surfacing will result in drainage issues. 
 The noise from the demolition of the church buildings was awful and resulted in
significant disruption and there is now concern regarding the noise and impact
during the construction process. 
 The proposal will impact on property prices. 
 The site should be developed to accommodate bungalows. 
 Concern regarding the communication from the Council regarding the proposal
as there was an issue with the neighbour notification process and we are not
receiving updates regarding the proposal.   
 Elderly residents cannot access the planning portal. 
 Concern regarding the lack of communication from the Diocese of Motherwell
regarding the site. 
 Two external bin stores are likely to attract rodents.
 Concern regarding the ambiguity of the ownership of the site.   
7.2. The above issues are considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and sets
out spatial principles, regional priorities, national developments and national planning
policy.  The relevant policies are:- 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation 
 Policy 3 - Biodiversity 
 Policy 9 - Brownfield, Vacant and Derelict Land and Buildings
 Policy 13 - Sustainable Transport 
 Policy 14 - Design, Quality and Place
 Policy 15 - Local Living and 20 Minute Neighbourhoods
 Policy 16 - Quality Homes  
86

Page 87

8.3. South Lanarkshire Local Development Plan 2
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2: 
SLLDP2 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 3 - General Urban Areas
 Policy 5 - Development Management and Placemaking
 Policy 15 - Travel and Transport
 Policy DM1 - New Development Design 
9.   Guidance
9.1. None. 
10.   Assessment and Discussion
10.1. Principle of Development 
The determining issues in the consideration of this application are its compliance with
national policy, local development plan policy and its impact on residential amenity,
traffic safety, environmental matters and infrastructure issues. 
10.2. Policy 9 of NPF4 identifies that proposals for the re-use of vacant brownfield land and
existing buildings will be supported as this will maximise the use of existing assets and
minimise additional land take.  The proposal relates to the sustainable re-use of vacant
land within an established urban area to provide residential accommodation. 
Subsequently, the proposal accords with the provisions of Policy 9 of NPF4.   
10.3. Policy 16 of NPF4 seeks to encourage, promote, and facilitate the delivery of more
high quality, affordable and sustainable homes, in the right locations.  The site is not
allocated for housing within the local development plan (LDP), therefore in terms of
Policy 16 part (f), the proposal is contained within the defined settlement boundary
where the principle of development is considered to be acceptable in accordance with
the LDP and NPF4 and therefore complies with part (iii) as the proposal is for smaller
scale opportunities within an existing settlement boundary.  A timing condition will be
applied to any permission granted in line with part (i).   
10.4. Overall, the principle of a small-scale housing development can therefore be accepted
in this case.  For the avoidance of doubt, Policy 16 part (e) is not applicable in this
case as affordable housing contributions are not required as the development relates
to provision of accommodation for the social rented sector.  Therefore, the principle of
the development of the site for a residential use raises no issues within the context of
Policy 16 of NPF4. 
10.5. The site is affected by Policy 3 of the adopted Local Development Plan which
establishes that residential developments, and those of an ancillary nature, may be
considered acceptable provided that they do not have a significant adverse impact on
the amenity and character of the area.  The site was previously developed and
occupied by a church, associated buildings and a residential dwellinghouse.  The
application site is situated within an established residential area.  The principle of the
proposed development would not result in a significant adverse impact on residential
amenity or the established character of the area and therefore raises no issues within
the context of Policy 3 of the adopted Local Development Plan.  
87

Page 88

10.6. Policies 1 and 2 of the adopted Local Development Plan and National Planning
Framework 4 encourage sustainable economic growth and regeneration, a move
towards a low carbon economy, the protection of the natural and historic environment
and mitigation against the impacts of climate change.  The proposal involves the
regeneration of a vacant site in Hamilton and therefore raises no issues within the
context of Policies 1 and 2 of the adopted Local Development Plan or NPF4.   
10.7. Layout, Siting and Design
Policies 14 and 15 of NPF4 relate to 20 minute neighbourhoods and liveable places. 
Policy 14 sets out that all development should be designed to improve the quality of
an area and be consistent with the six qualities of a successful place: healthy,
pleasant, connected, distinctive, sustainable and adaptable.  Policy 15 establishes that
development proposals should contribute to local living and 20 minute
neighbourhoods. 
10.8. The site is located in an established residential area within the Hamilton settlement
boundary and is situated in close proximity to a range of facilities and services.  The
site is considered to be well connected, situated directly adjacent to High Blantyre
Road and links to the wider transport network.  The proposal is situated in a
sustainable location which will support local compact living and be accommodated
within a 20 minute neighbourhood.  In addition, the site is considered to be adaptable
as the proposal seeks to ensure the long-term re-occupation of a derelict site whilst
improving the vitality and viability of the local area.  Subsequently, it is considered that
the proposal accords with the provisions of Policies 14 and 15 of NPF4. 
10.9. In terms of the detailed design of the development, Policies 5 and DM1 of the adopted
Local Development Plan generally require new development to have due regard to the
layout, form, design and local context of the area, and to promote quality and
sustainability in its design.  It is noted that prior to the demolition of the existing
buildings and structures that the site was densely developed, including buildings
constructed adjacent to the footpath at Reid Street.  The surrounding area comprises
a wide range of house types, styles and materials and whilst the adjacent properties
are generally two storeys in height there are flatted developments three storeys in
height in the surrounding area.   
10.10. The proposal relates to two storey dwellinghouses and a three storey flatted block. 
Following a detailed assessment, it is not considered that the proposed development
will result in a significant adverse visual impact on the streetscape.  In addition, the
external finishes of the development are considered acceptable within the context of
the established area. 
10.11. In relation to overshadowing, it is noted that the site was previously occupied by
numerous buildings and large trees which would have resulted in the overshadowing
of the adjacent properties.  A solar study has been submitted which demonstrates that
there will be an increase in overshadowing in comparison to the vacant site.  However,
this is not likely to result in a significant adverse impact on any adjacent properties. 
With regards to privacy, the proposed development meets the minimum window to
window distance required and the proposed landscaping will also provide additional
screening.  However, it should be noted that the application site and neighbouring
properties are within an established urban area where a degree of mutual overlooking
and overshadowing already occurs. 
10.12. The proposed development relates to a range of residential accommodation to provide
choice and meet the diverse needs of the local community.  It is considered that the
buildings have been designed and positioned within the site to minimise significant
88

Page 89

adverse impact on any adjacent dwellings in terms of loss of light, overshadowing,
overlooking or loss of privacy.  Subsequently, following assessment, it is considered
that the design, location and scale of the proposed development is acceptable and the
proposal raises no issues within the context of Policies 5 and DM1 of the adopted
Local Development Plan. 
10.13. Natural Environment 
NPF4 Policy 3 details that all local developments shall include appropriate measures
to conserve, restore and enhance biodiversity.  In addition, the policy states that any
potential adverse impacts, including cumulative impacts, of development proposals on
biodiversity, nature networks and the natural environment should be minimised
through careful planning and design.  The site is urban in nature, has been the subject
of substantial demolition and there is no evidence of any protected species occupying
the site.  In addition, prior to the submission of the planning application all of the
existing trees were removed.  However, the proposal includes a new landscaping
scheme which will improve the biodiversity impact of the development, in accordance
with the provisions of Policy 3 of NPF4.   
10.14. Transport 
Policy 13 of NPF4 provides support for development proposals which have links to
local facilities, are accessible via public transport, provide low emission vehicle
charging points, cycle parking and take into account the transport needs of diverse
groups whilst simultaneously reducing the dominance of the car.  The location of the
site and the design of the proposal support sustainable travel and generally address
these infrastructure requirements, in accordance with the provisions of Policy 13 of
NPF4. 
10.15. Policy 15 of the adopted Local Development Plan seeks to ensure that development
considers, and where appropriate, mitigates the resulting impacts of traffic growth and
encourages sustainable transport options that take account of provision for walking,
cycling and public transport.  In this regard, the site is situated in close proximity to a
wide range of facilities and services, is accessible by public transport and the
development would be well integrated into existing walking and cycling networks.  In
addition, Roads, Transportation and Fleet Services fully assessed the application and
consider that the proposal is acceptable in terms of access, parking and road safety
issues.  Subsequently, it is considered that the proposal accords with the provisions
of Policy 15 of the adopted Local Development Plan. 
10.16. In relation to the other matters raised, some of the representations identified concerns
regarding the neighbour notification process.  There was a delay in relation to the
neighbour notification letters, however, the letters were issued on 6 January 2025 and
the application was advertised in the local press.  Subsequently, it is considered that
the appropriate procedures have been undertaken with regards to this matter.  In
addition, paper copies of drawings and supporting information have been made
available to third parties when requested.  Communication from the owner of the site
is a matter outwith the control of the Planning Service.   
10.17. Whilst alternative uses for the site have been suggested by local residents, the
Planning Service are required to fully assess the proposal as submitted.  In relation to
the issue of construction noise, it is noted that similar to any construction site, the
proposal is anticipated to result in some local disruption in the short term.  However,
the issue of construction noise can be addressed through the use of advisory notes. 
A number of the other issues raised are not material consideration in the determination
of the planning application. 
89

Page 90

10.18. Conclusion 
In conclusion, the proposal relates to the creation of a high quality housing
development on a vacant site which will provide accommodation for the social rented
sector.  The design, layout and general impact of the development is considered to be
acceptable and the proposal raises no significant environmental or infrastructure
issues.  Overall, it is considered that the proposal complies with the provisions of the
relevant policies within the National Planning Framework 4 and the South Lanarkshire
Local Development Plan.  It is therefore recommended that the application be granted
subject to the conditions listed. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.    
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That the development is for the use by a registered social landlord and shall not
be used for private rent or sale, unless otherwise agreed in writing with the
Council as Planning Authority.    
Reason:  The submitted proposal has been assessed on the basis of this
tenure. 
03. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used
as external finishes on the development shall be submitted to and approved in
writing by the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
04. That no development shall commence on site until details of surface water
drainage arrangements have been submitted to and approved in writing by the
Council as Planning Authority; such drainage arrangements will require to
comply with the principles of sustainable urban drainage systems and with the
Council's Sustainable Drainage Design Criteria and shall include signed
appendices as required.  The development shall not be occupied until the
surface drainage works have been completed in accordance with the details
submitted to and approved by the Council as Planning Authority.   
Reason: To ensure that the disposal of surface water from the site is dealt with
in a safe and sustainable manner, to return it to the natural water cycle with
minimal adverse impact on people and the environment and to alleviate the
potential for on-site and off-site flooding. 
05. That prior to the occupation of the development, the landscaping scheme as
shown on the approved plans shall be completed. 
Reason: In the interests of biodiversity and visual amenity of the area. 
90

Page 91

06. That before development starts, full details of the design and location of all
fences and walls, including any retaining walls to be erected on the site shall
be submitted to and approved in writing by the Council as Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
07. That prior to the occupation of the development, the walls and fences approved
under the terms of the above condition shall be erected. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
08. That no development shall commence until a Construction Phase Traffic
Management Plan (CPTMP) has been submitted to and approved in writing by
the Council as Planning and Roads Authority.  The plan shall include details of
the following and all construction works shall be undertaken in accordance with
the approved CPTMP:- 
- The proposed delivery route for HGV traffic and construction vehicles.
- The wheel washing facilities to provide detritus being deposited on the public
road. 
- The arrangement of construction compound(s) and contractor/staff car
parking on site to ensure that no vehicles are parked on the public road.
- The location and layout of the delivery area and turning area within the site to
ensure that all construction delivery vehicles can enter and exit site in a forward
gear.
- Prior to agreement with the Council as Roads Authority, an identification of
the construction traffic route for which the required road dilapidation survey will
be undertaken. 
Reason: In the interests of road safety. 
9. That before the development hereby approved is brought into use, the entire
access road (including a dropped kerb access) and footpath network serving
the development shall be laid out and constructed in accordance with the
specification of the Council as Roads and Planning Authority.  
Reason: To ensure the provision of satisfactory vehicular and pedestrian
access to the dwellings. 
10. That works relating to the removal of the existing boundary wall will require the
installation of a new heel kerb and any works on the footway will require
resurfacing over the full width of the footway. 
Reason: To ensure the footway is reinstated to the correct standard. 
12. Reason for Decision
12.1. The proposal raises no significant adverse amenity, environmental or infrastructure
issues and complies with Policies 1, 2, 3, 9, 13, 14, 15 and 16 of the National Planning
Framework 4 and raises no issues within the context of Policies 1, 2, 3, 5, 15 and DM1
of the adopted South Lanarkshire Local Development Plan 2.  There are no other
material considerations which would justify the refusal of planning permission.  
91

Page 92

David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:-
P/24/1421 | Erection of 6 two storey houses (two terraced blocks) and a 3 storey block of 18 flats with
associated parking, landscaping and associated services | Land Enclosed By High Blantyre Road,
Glenlee Street And Reid Street Hamilton ML3 9HW 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
92

Page 93

93

Page 94

94

Page 95

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025  
Report by: Executive Director (Community and Enterprise
Resources) 
Reference no:  P/24/1423 
Proposal:  Erection of two 3-storey blocks of flats (24 units) with associated
parking, landscaping and associated services 
Site Address:  Land at Backmuir Road, Hamilton, ML3 0PX 
Applicant:  JR Group Ltd 
Agent:  Mast Architects
Ward:  17 - Hamilton North and East
Application Type:  Full planning permission
Advert Date:  Hamilton Advertiser 19th December 2024 
Development Plan
Compliance: 
Yes 
Departures:  N/A 
Recommendation:  Grant subject to conditions
Legal Agreement:  No 
Direction to
Scottish Ministers 
No 
10
95

Page 96

1. Reason for Report
1.1. This application is being presented to the Planning Committee for determination as
the proposal has received more than 5 objections. 
2. Site Description
2.1. The planning application site extends to approximately 0.4ha and is situated in an
established residential area of Hamilton.   
2.2. The site relates to an area of vacant land which previously accommodated St Paul’s
Church, an associated two storey residential dwelling, garage and garden ground. 
The buildings were demolished in 2024 and the existing landscaping removed.  The
topography of the site slopes gradually from the south west to the north east and
pedestrian access is from the existing footpath network with vehicular access from
Backmuir Road. 
3. Description of Proposed Development
3.1. The proposal will accommodate 12 one bedroom flats and 12 two bedroom flats for
social rent, with the end user being South Lanarkshire Council.  Externally, the flats
are proposed to be finished in a combination of facing brick, cladding, glazing panels
and concrete roof tiles.  In addition, the flatted units are proposed to have photovoltaic
panels integrated within the roof structure. 
3.2. The proposal includes the formation of vehicular and pedestrian accesses from
Backmuir Road, with footpath links throughout the site.  In addition, the development
includes 26 off street parking spaces and landscaping. 
4. Relevant Planning History
4.1. There is no relevant planning history relating to this site.   
5. Supporting Information 
5.1. In support of the planning application, the following has been submitted:- 
 Design and Access Statement
 Solar Study 
 Flood Risk Assessment 
 Ground Investigation Report 
 A letter confirming the end user of site 
6. Consultations
6.1. Environmental Services - No objection to the proposals, subject to conditions and
advisory notes relating to noise and the submission of a detailed remediation strategy. 
Response: Noted. 
6.2. Scottish Water - No objection to the proposal.
Response: Noted. 
6.3. Roads Development Management Team - No objection to the proposed development,
subject to conditions relating to the provision of a dropped kerb access and the
submission of a Construction Phase Traffic Management Plan.
Response: Noted. 
6.4. Housing Services – Advise the site is identified in the Council’s Strategic Housing
Investment Plan (SHIP).
Response: Noted.  
96

Page 97

7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, 21
representations (20 objections) have been received.  The issues raised are
summarised as follows:- 
Design Issues 
 There is concern regarding the height of the development in a lower density area. 
 The proposal is overdevelopment of this site.
 The bin storage areas should be relocated. 
 The existing palisade fence should be removed and replaced with a new fence. 
Amenity Issues
 The proposal will result in overlooking of adjacent properties and garden grounds. 
 The proposal will have a negative impact on the privacy of neighbouring
properties.
 The proposal will block the sunlight to properties on Abbotsford Avenue.
 Before the demolition of the church building and manse, there were large trees
around the perimeter which provided the houses with a large measure of privacy. 
Roads Related Matters
 There is a shortage of off-street parking in the development.
 The parking provision doesn’t accord with the Councils Residential Development
Guide and 36 spaces are required. 
 An increase in traffic so close to the school will have an adverse impact on
children’s safety.
 The area is already congested with traffic associated with the football ground and
the schools in the surrounding area and this proposal will exacerbate this issue. 
Other Matters Raised
 The ground should be used as a play area as there is currently no such amenity
areas for local children.
 The proposal is contrary to Local Plan policy. 
 The development will have an impact on private mortgage payers.
 The development will put pressure on existing local amenities.
 Concern regarding the noise during the construction process. 
 Neighbour notification letters were sent out before Christmas and the residents
have not had sufficient time to consider the proposal. 
7.2. The above issues are considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and sets
out spatial principles, regional priorities, national developments and national planning
policy.  The relevant policies are:-  
97

Page 98

National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation 
 Policy 3 - Biodiversity 
 Policy 9 - Brownfield, Vacant and Derelict Land and Buildings
 Policy 13 - Sustainable Transport 
 Policy 14 - Design, Quality and Place
 Policy 15 - Local Living and 20 Minute Neighbourhoods
 Policy 16 - Quality Homes 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will also assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 3 - General Urban Areas
 Policy 5 - Development Management and Placemaking
 Policy 15 - Travel and Transport
 Policy DM1 - New Development Design 
9.   Guidance
9.1. None. 
10.   Assessment and Discussion
10.1. Principle of Development 
Detailed planning permission is sought for the erection of two 3-storey blocks of flats
(24 units) with associated parking, landscaping and associated services at Backmuir
Road, Hamilton.  The determining issues in the consideration of this application are its
compliance with national policy, local development plan policy and its impact on
residential amenity, traffic safety, environmental matters and infrastructure issues. 
10.2. Policy 9 of NPF4 identifies that proposals for the re-use of vacant brownfield land and
existing buildings will be supported as this will maximise the use of existing assets and
minimise additional land take.  The proposal relates to the sustainable re-use of vacant
land within an established urban area to provide residential accommodation. 
Subsequently, the proposal accords with the provisions of Policy 9 of NPF4.   
10.3. Policy 16 of NPF4 seeks to encourage, promote, and facilitate the delivery of more
high quality, affordable and sustainable homes, in the right locations.  The site is not
allocated for housing within the local development plan (LDP), therefore in terms of
Policy 16 part (f), the proposal is contained within the defined settlement boundary
where the principle of development is considered to be acceptable in accordance with
the LDP and NPF4 and is therefore considered to comply with part (iii) as the proposal
is for a smaller scale opportunity within an existing settlement boundary.  A timing
condition will be applied to any permission granted in line with part (i).   
10.4. Overall, the principle of a small-scale housing development can therefore be accepted
in this case.  For the avoidance of doubt, Policy 16 part (e) is not applicable as
affordable housing contributions are not required as the development relates to
provision of accommodation for the social rented sector.  Therefore, the principle of
98

Page 99

the development of the site for a residential use raises no issues within the context of
Policy 16 of NPF4. 
10.5. The site is affected by Policy 3 of the adopted Local Development Plan which
establishes that residential developments, and those of an ancillary nature, may be
considered acceptable provided that they do not have a significant adverse impact on
the amenity and character of the area.  The site was previously occupied by a two
storey church and a two storey dwellinghouse, with associated access and parking. 
Therefore, the principle of development, including residential accommodation, at this
site has been established.  Subsequently, it is considered that the principle of the
proposed use of the site for flatted units would not result in a significant adverse impact
on residential amenity or the established character of the area and therefore raises no
issues within the context of Policy 3 of the adopted Local Development Plan. 
10.6. Policies 1 and 2 of the adopted Local Development Plan and National Planning
Framework 4 encourage sustainable economic growth and regeneration, a move
towards a low carbon economy, the protection of the natural and historic environment
and mitigation against the impacts of climate change.  The proposal involves the
regeneration of a vacant site in Hamilton and therefore raises no issues within the
context of Policies 1 and 2 of the adopted Local Development Plan or NPF4.   
10.7. Layout, Siting and Design
Policies 14 and 15 of NPF4 relate to 20 minute neighbourhoods and liveable places. 
Policy 14 sets out that all development should be designed to improve the quality of
an area and be consistent with the six qualities of a successful place: healthy,
pleasant, connected, distinctive, sustainable and adaptable.  Policy 15 establishes that
development proposals should contribute to local living and 20 minute
neighbourhoods. 
10.8. The proposed development site is located within the Hamilton settlement boundary
and is within walking distance of a wide range of facilities and services.  The site is
considered to be well connected and situated within a sustainable location which will
support local compact living and a 20 minute neighbourhood.  In addition, the site is
considered to be adaptable as the proposal seeks to ensure the long-term re-
occupation of a vacant site whilst simultaneously improving the vitality of the area.  It
is considered that the proposal accords with the provisions of Policies 14 and 15 of
NPF4. 
10.9. In terms of the detailed design of the development, Policies 5 and DM1 of the adopted
Local Development Plan generally require new development to have due regard to the
layout, form, design and local context of the area, and to promote quality and
sustainability in its design.   
10.10. The proposed three storey flatted dwellings are of modern design with a suitably high
standard of external finishing materials.  The site is surrounded by a range of
properties which vary in height but are predominantly two storeys.  However, the
proposed street elevations illustrate that, whilst higher, the development will not be out
of keeping with the existing residential development in the surrounding area. 
10.11. In relation to overshadowing, it is noted that the site was previously occupied by a two
storey dwelling, a two storey church building and there were high trees at the
boundaries which would have resulted in overshadowing of the adjacent properties. 
A solar study has been submitted which demonstrates that whilst there will be an
increase in overshadowing this is not likely to result in a significant adverse impact on
any adjacent properties.  With regards to privacy, a new 1.8m high screen fence will
99

Page 100

enclose the site and the proposed landscaping will also provide additional screening. 
In addition, the proposed development meets the minimum window to window distance
required.  Notwithstanding the above, it should be noted that the application site and
neighbouring properties are within an established urban area where a degree of
mutual overlooking and overshadowing already occurs. 
10.12. The proposed development relates to a range of flatted dwelllings to provide choice
and meet the diverse needs of the local community.  It is considered that the buildings
have been designed and positioned within the site to minimise any significant adverse
impact on any adjacent dwellings in terms of loss of light, overshadowing, overlooking
or loss of privacy.  Subsequently, following assessment it is considered that the
design, location and scale of the proposed development is acceptable and the
proposal raises no issues within the context of Policies 5 and DM1 of the adopted
Local Development Plan. 
10.13. Natural Environment 
NPF4 Policy 3 details that all local developments shall include appropriate measures
to conserve, restore and enhance biodiversity.  In addition, the policy states that any
potential adverse impacts, including cumulative impacts, of development proposals on
biodiversity, nature networks and the natural environment should be minimised
through careful planning and design.  Prior to the submission of the planning
application all of the existing trees were removed leaving a vacant site.  However, the
proposal includes a new landscaping scheme which will improve the biodiversity
impact of the development, in accordance with the provisions of Policy 3 of NPF4. 
10.14. Transport 
Policy 13 of NPF4 provides support for development proposals which have links to
local facilities, are accessible via public transport, provide low emission vehicle
charging points, provide cycle parking and take into account the transport needs of
diverse groups whilst simultaneously reducing the dominance of the car.  The location
of the site and the design of the proposal support sustainable travel and generally
address these infrastructure requirements, in accordance with the provisions of Policy
13 of NPF4. 
10.15. Policy 15 of the adopted Local Development Plan seeks to ensure that development
considers, and where it is appropriate, mitigates the resulting impacts of traffic growth
and encourages sustainable transport options that take account of provision for
walking, cycling and public transport.  In this regard, the site is situated in close
proximity to a wide range of facilities and services, is accessible by public transport
and the development would be well integrated into existing walking and cycling
networks.  In addition, Roads, Transportation and Fleet Services fully assessed the
application and consider that the proposal is acceptable in terms of access, parking
and road safety issues.  Subsequently, it is considered that the proposal accords with
the provisions of Policy 15 of the adopted Local Development Plan. 
10.16. In relation to the other matters raised which include alternative proposals for the
redevelopment of the site, the Planning Service require to assess the application as
submitted.  With regards to the neighbour notification letters, whilst the points are
noted, this process has been correctly undertaken by the Planning Service and it is
considered any interested third parties have had full opportunity to submit comment. 
In relation to house valuations, this is not a material consideration in the determination
of the planning application.  In addition, in relation to the issue of construction noise it
is noted that, similar to any construction site, the proposal is anticipated to result in
some local disruption in the short term.  However, the issue of construction noise can
be addressed through the use of planning advisory notes.   
100

Page 101

10.17. Conclusion 
In conclusion, the proposal relates to the creation of a high quality housing
development on a vacant site which will provide affordable accommodation for the
social rented sector.  The design, layout and general impact of the development is
considered to be acceptable and the proposal raises no significant environmental or
infrastructure issues.  Overall, it is considered that the proposal complies with the
provisions of the relevant policies within the National Planning Framework 4 and the
South Lanarkshire Local Development Plan.  It is therefore recommended that the
application be granted subject to the conditions listed. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used
as external finishes on the development shall be submitted to and approved in
writing by the Council as Planning Authority.    
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
03. That no development shall commence on site until details of surface water
drainage arrangements have been submitted to and approved in writing by the
Council as Planning Authority; such drainage arrangements will require to
comply with the principles of sustainable urban drainage systems and with the
Council's Sustainable Drainage Design Criteria and shall include signed
appendices as required.  The development shall not be occupied until the
surface drainage works have been completed in accordance with the details
submitted to and approved by the Council as Planning Authority.    
Reason: To ensure that the disposal of surface water from the site is dealt with
in a safe and sustainable manner, to return it to the natural water cycle with
minimal adverse impact on people and the environment and to alleviate the
potential for on-site and off-site flooding. 
04. For the avoidance of doubt the approved bin storage shall not be constructed
of timber and prior to the completion of the development further details of the
proposed design, location and materials of the bin storage units shall be
submitted to and approved in writing by the Council as Planning Authority. 
Reason: To maintain the visual quality of the area. 
101

Page 102

05. Prior to the commencement of any works on site, a detailed remediation
strategy shall be submitted to and approved in writing by the Council as
Planning Authority.  For the avoidance of doubt, no works other than
investigative works shall be carried out on site prior to the Council's written
approval of the remediation plan. 
The investigation and remediation plan shall be completed in accordance with
the following:- 
- Planning Advice Note 33 (2000) and Part IIA of the Environmental Protection
Act 1990 (as inserted by section 57 of the Environment Act 1995).  
- Land Contamination Risk Management Guidance (LCRM)- issued by DEFRA
and the Environment Agency.  
- The latest edition of BS 10175- British Standards institution 'The Investigation
of Potentially Contaminated Sites - Code of Practice.'    
(a) The remediation of the site shall be carried out in accordance with the
approved remediation plan prior to the proposed development being brought
into use.  Any amendments to the approved remediation plan shall not be
implemented unless approved in writing by the Council as Planning Authority.  
(b) On completion of the remediation works, the developer shall submit a
completion report to the Council as Planning Authority, confirming that the
works have been carried out in accordance with the approved remediation plan
and that the works have successfully reduced these risks to acceptable levels. 
(c) Any previously unsuspected contamination which becomes evident during
the development of the site shall be brought to the attention of the Council as
Planning Authority, within one week or earlier of it being identified.  A more
detailed site investigation to determine the extent and nature of the
contaminant(s) and a site-specific risk assessment of any associated pollutant
linkages, shall be submitted to and approved in writing by the Council as
Planning Authority. 
Reason: Following the Phase 1 and Phase 2 site investigations the conceptual
site model and related risk assessment of all relevant pollutant linkages have
identified unacceptable risks. 
06. That the development is for the use by a registered social landlord and shall not
be used for private rent or sale, unless otherwise agreed in writing with the
Council as Planning Authority.   
Reason: The submitted proposal has been assessed on the basis of this tenure. 
07. That prior to the occupation of the development, the landscaping scheme as
shown on the approved plans shall be completed to the satisfaction of the
Council as Planning Authority. 
Reason: In the interests of biodiversity and visual amenity of the area. 
08. That before development starts, full details of the design and location of all
fences and walls, including any retaining walls to be erected on the site shall
be submitted to and approved in writing by the Council as Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area.  
102

Page 103

09. That prior to the occupation of the development, the walls and fences approved
under the terms of the above condition shall be erected. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
10.  That no development shall commence until a Construction Phase Traffic
Management Plan (CPTMP) has been submitted to and approved in writing by
the Council as Planning and Roads Authority.  The plan shall include details of
the following and all construction works shall be undertaken in accordance with
the approved CPTMP:- 
- The proposed delivery route for HGV traffic and construction vehicles.
- The wheel washing facilities to provide detritus being deposited on the public
road. 
- The arrangement of construction compound(s) and contractor/staff car
parking on site to ensure that no vehicles are parked on the public road.
- The location and layout of the delivery area and turning area within the site to
ensure that all construction delivery vehicles can enter and exit the site in a
forward gear.
- Prior to agreement with the Council as Roads Authority, an identification of
the construction traffic route for which the required road dilapidation survey will
be undertaken. 
Reason: In the interests of road safety. 
11. That before the development hereby approved is brought into use, the entire
access road (including a dropped kerb access) and footpath network serving
the development shall be completed and available for use.    
Reason: To ensure the provision of satisfactory vehicular and pedestrian
access to the development. 
12. That works relating to the removal of the existing boundary wall will require the
installation of a new heel kerb and any works on the footway will require
resurfacing over the full width of the footway. 
Reason: To ensure the footway is reinstated to the correct standard. 
12. Reason for Decision
12.1. The proposal raises no significant adverse amenity, environmental or infrastructure
issues and complies with Policies 1, 2, 3, 9, 13, 14, 15 and 16 of the National Planning
Framework 4 and raises no issues within the context of Policies 1, 2, 3, 5, 15 and DM1
of the adopted South Lanarkshire Local Development Plan 2.  There are no other
material considerations which would justify the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
103

Page 104

Background Papers
Further information relating to the application can be found online:-
P/24/1423 | Erection of two 3-storey blocks of flats (24 units) with associated parking,
landscaping and associated services. | Land At Backmuir Road Hamilton ML3 0PX 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
104

Page 105

105

Page 106

106

Page 107

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 4 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1465
Proposal:  Erection of single storey dwellinghouse with attic space, associated
garage/studio space and formation of new driveway 
Site Address:  Land 82M Northwest of 148 Lanark Road
Lanark Road
Crossford 
Applicant:  Mr Scott and Mrs Neal
Agent:  Thomas Robinson Architects
Ward:  01 Clydesdale West
Application Type:  Full Planning Permission
Advert Date:  Lanark Gazette – 18th December 2024
Development Plan
Compliance: 
No 
Departures:  No
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
11
107

Page 108

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee as the Head
of Planning and Regulatory Services, in consultation with the Chair of Planning
Committee, has determined it raises policy issues meriting consideration by the
Planning Committee. 
2. Site Description
2.1. The application site is located on the A72, Lanark Road situated between Crossford
and Hazelbank.  The site is 60m in depth, at its deepest on the southeast boundary
and 38m on the northwest boundary and 43m wide.  The site rises towards the
southwest where it meets a wooded area.   
2.2. To the northwest is a former school building, previously a restaurant and now
converted to dwellings known as, ‘The Old School & Davingillbank’.  To the southeast
lies Underwood Cottage, beyond which is the former Underbank Primary School site
and Silverbirch Garden Centre. 
2.3. The site is designated as being within the rural area. 
3. Description of Proposed Development
3.1. The application seeks detailed planning permission for the erection of a single storey
dwellinghouse, with attic accommodation, a detached garage and studio.  A new
access point is proposed with a sweeping drive.  The proposed house would be set
back from the road, with the garage running along the northwest boundary.  A ground
mounted solar array is proposed to the front of the site. 
3.2. The dwellinghouse proposed relates to a single storey dwelling, accommodating an
open plan kitchen living dining area, 2 bedrooms on the ground floor and a further 2
bedrooms and studio on the upper floor.  Box dormers on either roof plane are
proposed, materials include a slate roof, stone and timber cladding.  The boundary
treatment consists of a beech hedge along the frontage and a low stone wall as a
feature of the access point. 
4. Relevant Planning History
4.1. An earlier application was received, in April 2024, by the same applicant and agent. 
Advice was provided to the applicant that the application was unlikely to be supported
and they sought to withdraw prior to the application being validated (ref P/24/0418). 
5. Supporting Information 
5.1. The application includes a supporting statement and a drainage statement. 
6. Consultations
6.1. Environmental Services - No objections to the proposal
Response: Noted. 
6.2. Roads Development Management Team - No objections subject to conditions.
Response: Noted. 
6.3. Scottish Water - There is a public water connection available, however, there is no
infrastructure for a public foul drainage connection
Response: Noted, the drainage statement has considered a septic tank arrangement
for the development.  
108

Page 109

7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, no valid
representations have been received. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and sets
out spatial principles, regional priorities, national developments, and national planning
policy.  The relevant policies are:- 
National Planning Framework 4 Policies 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 5 - Soils
Policy 9 - Brownfield, vacant and derelict land and empty buildings
Policy 16 - Quality homes
Policy 17 - Rural homes 
8.3. South Lanarkshire Local Development Plan 2 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies  
Policy 2 - Climate Change  
Policy 4 - Green Belt and Rural Area  
Policy 5 - Development Management and Placemaking  
Policy 14 - Natural and Historic Development 
SLLDP2 Volume 2 Policies  
Policy GBRA1 - Rural Design and Development
Policies GBRA 4 - 10  
Policy NHE16 - Landscape  
Policy DM1 - New Development Design  
Policy NHE10 - Prime Agricultural Land 
South Lanarkshire Council (SLC) Supporting Planning Guidance
Electric Vehicle Charging Points – August 2022 
9. Guidance
9.1. Nature Scot - Developing with Nature guidance. 
10. Assessment and Discussion
10.1. Principle of Development
The site is located in the rural area, outwith the settlement boundary of Crossford.  
109

Page 110

10.2. A supporting statement submitted by the applicant sets out that the proposal would
improve the visual amenity of the area and provide continuity of development in the
area.  It notes there is a site adjacent which previously sought consent and has applied
to renew their permission.  The application to renew has since been withdrawn.  The
statement further sets out policies which the proposal complies with.   
10.3. NPF4 Policy 17 Rural Housing is a relevant policy as the site is located in the rural
area.  This policy is not covered in the supporting statement.  Policy 17 sets out in part
(a) eight situations numbered (i to viii) where a dwellinghouse could be considered in
the rural area.   
10.4. SLLDP2 Policy 4 details that for the Green Belt and Rural Area, proposals that do not
need to be located in the countryside (in this case defined rural area) shall be expected
to be within settlements.  There is no detailed need for this proposal to be sited in the
rural area. 
10.5. Policy 4 does, however, hold exceptions and directs the reader to seven situations set
out in Policies GBRA4 to 10 (inclusive) where residential proposals could be
considered in the rural area.  The exceptions in the SLLDP2 policies for the most part
are similar to that in NPF4. 
10.6. SLLDP2 Policy GRBA4 – Conversion and Re-Use of Buildings, Policy GBRA5 –
Redevelopment of previously developed land containing buildings and GRBA6
Replacement Dwelling are similar to circumstances permitted within NPF4 Policy 17 -
namely (ii-brownfield), (iii-reuse of building), (iv – historic asset), (vii – retirement farm
home) and (viii – replacement/reinstatement), respectively. 
10.7. All the aforementioned policies require an existing building or previous development
land on site.  This site is a green field site, a review of historic mapping back to late
1800’s demonstrates no previous uses.  The site has no characteristics of brownfield
land and there are no buildings on site.  The site would not meet any of the terms of
the aforementioned policies in SLLDP2 or criterion of Policy 17 NPF4. 
10.8. SLLDP2 Policy GBRA 10 permits accommodation associated with a rural business,
again similar to point v – dwelling to support rural business/croft permitted by NPF4
Policy 17.  Policy 17 also explicitly supports retirement succession homes for a farm
holding (point vi).  There is no rural business/farm or croft to sustain or succeed on
this site. 
10.9. SLLDP2 GBRA7 permits a small-scale settlement extension in the rural area, this site
is not adjacent to the settlement boundary (the boundary of Crossford is 380m away)
so GBRA7 is not relevant to this proposal.  GBRA8 – Development of a Gap Site
permits a site where the site is bound on two sides by a dwellinghouse and where the
proposed plot is in keeping with the curtilage and frontage of the existing group. 
10.10. The proposed application site is not bound on two sides by dwellinghouses, therefore
this policy is not relevant to this site.  SLLDP2 GBRA 9 Consolidation of a Building
Group permits a rounding off of a group of houses defined to be three or more.  The
application site is not within a housing group, as such, this policy is not relevant to this
site.  The proposal does not meet any of the GBRA policies and is considered contrary
to SLLDP2 Policy 4. 
10.11. The site is not allocated for housing in the LDP (point (i) of Policy 17).  And as per the
above assessment, the proposal does not meet any of the other situations set out in
part (a) Policy 17.  It is therefore contrary to NPF4 Policy 17.   
110

Page 111

10.12. NPF4 Policy 16 Quality Homes details that homes not allocated for housing shall only
be supported in limited circumstances, set out in part (f).  The proposal is not
considered to be consistent with the rural homes policy nor is it within a settlement
boundary.  The proposal is contrary to the terms of Policy 16. 
10.13. NPF4 Policy 9 Brownfield Land, vacant land and empty buildings details that
development on greenfield sites, which this site is deemed to be, shall not be
supported unless the site has been allocated or explicitly supported by local
development plan policies.  The site is not allocated nor is the proposal explicitly
supported by local development plan policies.  The proposal is contrary to the terms
of Policy 9. 
10.14. It is concluded that the proposal is contrary to SLLDP2 Policy 4 and NPF4 Policies 17,
9 and 16 and the principle of residential use here does not meet the terms of the
development plan.  Nor do any of the reasons set out in the applicants’ statement carry
sufficient weight to override this non-compliance with the development plan. 
10.15. Climate Change
NPF4 Policy 1 requires that when considering all development proposals significant
weight will be given to the global climate and nature crises.  NPF4 Policy 2 Climate
Change and Mitigation expands on this, requiring all new developments to be sited
and designed (1) to minimise lifecycle greenhouse gas emissions as far as possible
and (2) to adapt the current and future risks from climate change.  SLLDP2 Climate
Change carries similar aims. 
10.16. The proposal has included ground mounted solar panels.  If the proposal had
otherwise been found acceptable in principle other aspects of the climate change
policies could be met or dealt with by revision or condition. 
10.17. Layout, Siting and Design
Notwithstanding that the principle of development is not supported at this location, the
proposal is also required to meet the design policies.  Policy DM1 requests that
proposals respect the local context and are appropriate to the local character.  Policy
GBRA1 adds further scrutiny to ensure suburban style development is not introduced
to the rural area and residential development is not sporadic.  NPF4 Policy 14 seeks
that attention is paid to the detail of local architectural styles and these are interpreted
to reinforce identity in the surrounding area. 
10.18. The application site has remained undeveloped throughout history and has separated
the original schoolhouse location from the later location and then modern school, on
the opposite of the road.  To approve a dwelling on this site would change the
development pattern of this area and it is not considered it would provide continuity,
instead it is considered that the proposal would set an undesirable precedent and
development pressure on remaining open land adjacent to the site. 
10.19. It is considered the application site would detract from the local context as the position
of the dwelling in the site (over 20m from the road) itself does not reflect the immediate
context.  If the proposal was found to be acceptable in principle further revisions to the
design itself would have been required to present a dwelling which respects local form,
detail or materials. 
10.20. Other Issues
The site appears to be unmanaged grass or scrub field, which sits adjacent to
Devongill Wood, designated as a long-established woodland i.e. used as woodland
since 1800’s and is in proximity to the River Clyde.  The site is located in the Special
111

Page 112

Landscape Area - Middle Clyde Valley and in the landscape character area of Incised
River Valley and is in a highly visible location on the A72. 
10.21. SLLDP2 Policy 14 Natural and Historic Environment directs the reader to Policy
NHE16 Landscape, which advises proposals in special landscape areas shall only be
permitted if they accord with SLLDP2 and guidance on the Green Belt and Rural Area. 
The proposal does not accord with SLLDP2 or Green Belt and Rural Area guidance. 
Additionally, the loss of natural features to be replaced by incremental residential
development in a prominent position would run counter to the landscape advice.  The
proposal is contrary to SLLDP2 Policy 14 and Policy NHE16. 
10.22. NPF4 Policy 3 Biodiversity under part (c) requires local applications, such as this, to
include biodiversity measures to conserve, restore and enhance which are
proportionate to the nature and scale of the proposal.  No biodiversity measures have
been identified.  Although at this scale, if other matters are resolved, biodiversity
measures could be conditioned.  There is a concern over the extent of natural area
the proposed plot would accommodate which does not sit with the aim to conserve
biodiversity by using avoidance as a first principle.  The strategy maps also identify
the land as prime agricultural land.  The land classification maps show the land as
Class 3.2 which Policy NHE10 defines as locally important.  Whilst it does not appear
the land is in agricultural use; this land is considered highly flexible for other uses
including woodland.  To approve and utilise land of this quality for residential purpose
which has remained undeveloped would run counter to SLLDP2 Policy NHE10 and
Policy 5 Soils seeking to protect high quality soils.   
10.23. Technical Matters
NPF4 Policy 22 Flood risk and water management details that proposals shall not
increase risk of surface water to others or themselves.  Additionally, all rain and
surface water be managed through SUDS and form part of proposed/existing
blue/green infrastructure and area of impermeable surface to be minimised.  SDCC3
Sustainable Drainage Systems advises SUDS is required on all developments with
the exception of single dwellings.  The site is not at risk from river or surface water
flooding, albeit land adjacent on the opposite site of the A72 is at risk.  A drainage
statement and layout has been provided setting out that surface water would be dealt
with by infiltration trenches, however, percolation rates of the soil or a design has not
been provided.  However, for this scale of development provision of a soakaway or
similar would be regulated by Building Regulations.  Further consideration would be
required to show compliance with Policy 22. 
10.24. SLLDP2 Policy DM16 Water Supply and Policy DM16 Foul Drainage seeks to ensure
appropriate water supply and foul drainage arrangements.  The application form
details connections will be made to the existing public water system and a private foul
system would be used.  A layout of the foul system has been provided, if otherwise
acceptable, this would be controlled by condition.  Therefore, the proposal meets the
terms of Policy DM15 and DM16. 
10.25. Conclusion 
In summary, the proposal is sited outwith the settlement boundary of Crossford in the
rural area.  Whilst there are other dwellings in proximity but not directly adjacent, the
proposal would not meet the terms of the gap site policy in SLLDP2 and would set an
undesirable precent.  Furthermore, proposals require to meet NPF4 and SLLDP2,
particularly in relation to the aim to facilitate sustainable rural homes in the right
location.  
112

Page 113

10.26. The proposal does not meet the rural housing polices of SLLDP2 or NPF4.  There are
no material considerations which would outweigh this conflict with the development
plan.  It is recommended that the application is refused planning permission. 
11. Recommendation and Reasons
11.1.  The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 4 - Green Belt and the Rural Area of
South Lanarkshire Local Development Plan 2 as the dwelling is not required to
be located in the countryside and the proposal does not meet any of the
exceptions set out in Policies GBRA 4-10 inclusive. 
02. The proposal would be contrary to Policy 14 Natural and Historic Environment
and Policy NHE16 Landscape of South Lanarkshire Local Development Plan 2
as it would result in further incremental residential development which is not
supported by the LDP in the Special Landscape Area and does not accord with
Green Belt and Rural Area Guidance. 
03. The proposal would be contrary to Policy 17 - Rural homes of National Planning
Framework 4 as new homes in rural areas are not supported in unsuitable
locations.  The proposed location for the new dwelling does not meet any of the
criteria to be considered suitable and, as such, cannot be supported. 
04. The proposal would be contrary to Policy 16 - Quality Homes of National
Planning Framework 4 as it does not constitute the delivery of high-quality
homes in the right locations as set out in the policy criteria. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 24 February 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/1465 | Erection of single storey dwellinghouse with attic space associated
garage/studio-space and formation of new driveway. | Land 82M Northwest Of 148 Lanark
Road Lanark Road Crossford Carluke South Lanarkshire 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
113

Page 114

114