Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 17 June 2024 
Dear Councillor 
Planning Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 25 June 2024
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Richard Nelson (Chair), Gerry Convery (Depute Chair), Joe Fagan (ex officio), Alex Allison, Ralph
Barker, Archie Buchanan, Ross Clark, Margaret Cowie, Maureen Devlin, Colin Dewar, Mary
Donnelly, Elise Frame, Alistair Fulton, Celine Handibode, Graeme Horne, Ross Lambie, Martin
Lennon, Monique McAdams, Lesley McDonald, Davie McLachlan, Norman Rae, John Ross,
Graham Scott, David Shearer, Helen Toner, David Watson 
Substitutes
Walter Brogan, Robert Brown, Mathew Buchanan, Margaret Cooper, Poppy Corbett, Allan Falconer,
Grant Ferguson, Gladys Ferguson-Miller, Martin Hose, Julia Marrs, Ian McAllan, Kenny McCreary,
Bert Thomson
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of meeting of the Planning Committee held on 28 May 2024 submitted
for approval as a correct record. (Copy attached) 
5 - 8 
Item(s) for Decision 
3 Masterplan Consent Areas
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
9 - 12 
4 Application P/21/0225 for Importation of Inert Waste to Remediate Former
Reservoir to Woodland Including Operation of an Inert Construction Waste
Recycling Facility at Boghead Reservoir, Bellscroft Road, Boghead,
Lanark
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
13 - 20 
5 Application P/22/1224 for Extraction and Processing of Hard Rock
Aggregates by Quarrying Methods - Section 42 Application to Vary
Condition 41 (Relocation of Ethylene Pipeline) and Condition 43
(Confirmation of Predicted Vibration Levels) of Planning Consent
P/20/0514 at Duneaton Quarry, B7078 from Millbank to Abington,
Crawfordjohn, Biggar
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
21 - 30 
6 Application P/23/1293 for Extraction and Processing of Hard Rock
Aggregates by Quarrying Methods (Section 42 Application to Vary
Condition 1 of Planning Consent P/20/0514, to Permit an Extended Period
for the Extraction of Reserves from 2 June 2029 to 2 June 2036) at
Duneaton Quarry, B7078 from Millbank to Abington, Crawfordjohn, Biggar
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
31 - 46 
7 Application P/23/1289 for Formation of Football Pitch/Sports Facility and
Installation of 6 x 15 Metre High Floodlights, Refurbishment and Extension
of Larkfield Hall, Formation of Additional Parking, Re-Alignment of
Existing Footpaths, Erection of Fencing Enclosing Pitch and Associated
Alterations at Land Adjacent to Stonefield Road and Larkfield
Neighbourhood Hall, Blantyre
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
47 - 58 
8 Application P/24/0243 for Change of Use of Retail Premises (Class 1A) to
Gymnasium (Class 11) at Unit 3, Braidfute Retail Park, Old Market Road,
Lanark
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
59 - 68
2

Page 3

9  Application P/24/0278 for External Alterations Associated with the Change
of Use of a Betting Office to a Restaurant Including the Formation of a Flue
at 4A Cullen Road, East Kilbride
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
69 - 76 
10  Application P/24/0297 for Change of Use of Farm Steading to Form 2
Dwellings, Restoration of Farmhouse to Form 1 Dwelling, Erection of 3
Houses and Associated Access Improvements - Further Application Under
Regulation 11 to Amend Layout and Design of 1 of the Houses Approved
Under Application P/22/0345 at Orchard Farm, Waygateshaw Road,
Carluke
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
77 - 96 
11  Application P/24/0329 for Demolition of Existing Building and Erection of 4
Terraced Houses with Associated Parking and Landscaping at 26 Church
Street, Larkhall
Report dated 17 June 2024 submitted by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
97 - 106 
Urgent Business 
12  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

PLANNING COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 28 May 2024 
Chair:
Councillor Richard Nelson 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Archie Buchanan, Councillor Ross
Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cowie, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Mary Donnelly, Councillor Celine Handibode, Councillor Graeme
Horne, Councillor Lesley McDonald, Councillor Davie McLachlan, Councillor Norman Rae,
Councillor Graham Scott, Councillor David Shearer, Councillor Helen Toner, Councillor David
Watson 
Councillors' Apologies:
Councillor Joe Fagan (ex officio), Councillor Elise Frame, Councillor Alistair Fulton, Councillor Ross
Lambie, Councillor Martin Lennon, Councillor Monique McAdams, Councillor John Ross 
Attending:
Community and Enterprise Resources
F Carlin, Head of Planning and Regulatory Services; B Darroch, Planning and Building Standards
Manager (East); T Finn, Planning and Building Standards Manager (Headquarters); F Jack, Team
Leader, Development Management Team, Roads, Transportation and Fleet Services
Finance and Corporate Resources
S Jessup, Administration Assistant; S McLeod, Administration Officer 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Planning Committee held on 30 April 2024 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 South Lanarkshire Development Plan Scheme 2024 and Local Development Plan 3
Update 
A report dated 20 May 2024 by the Executive Director (Community and Enterprise Resources)
was submitted:- 
♦ requesting approval of the South Lanarkshire Development Plan Scheme 2024, attached
as Appendix 1 to the report
♦ providing an update on progress made in the preparation of the South Lanarkshire Local
Development Plan 3 (SLLDP3)
2
5

Page 6

The Development Plan Scheme (DPS), which was required to be published annually, set out
South Lanarkshire Council’s timetable for the preparation of its local development plan and
included:- 
 an explanation of what the local development plan was
 a timetable for the preparation of SLLDP3
 details of community engagement in the planning process and how relevant stakeholders,
including residents, could get involved 
In line with updated national guidance and legislation, the South Lanarkshire Local Development
Plan 3 would be place-based and presented as a series of maps, site briefs and masterplans for
individual sites and localities.  The Plan would be a corporate document and a vehicle for the
delivery of outcomes by drawing on the Council’s strategies and plans, including the objectives
of the Council Plan, Connect 2022 to 2027, as well of those of its partners and other
stakeholders, including the South Lanarkshire Community Planning Partnership’s Community
Plan 2022 to 2032. 
SLLDP3 would include a Delivery Programme detailing how the Council would implement the
Plan and the associated timescales. 
The Council was required to engage with key agencies whilst preparing the Plan including
NatureScot, SEPA, Scottish Water, Scottish Enterprise, NHS Lanarkshire and the Regional
Transport Partnership.  It was also required to engage with a range of groups including children
and young people, disabled persons, Gypsies and Travellers and Community Councils.  The
Participation Statement in the DPS had been developed to reflect those requirements and
detailed the work on engagement that would be undertaken over the next 6 months. 
The DPS also included an updated timetable in relation to the following stages over the next 12
months, details of which were included in the report:- 
 drafting of the evidence report
 early engagement
 gate check 
There followed a discussion during which an officer responded to members’ questions on
aspects of the report. 
The Committee decided: 
(1) that the South Lanarkshire Development Plan Scheme 2024, attached as Appendix 1 to
the report, be approved and published on the Council’s website; and 
(2) that the update on progress made in the preparation of the South Lanarkshire Local
Development Plan 3 (SLLDP3) be noted. 
[Reference:  Minutes of 8 August 2023 (Paragraph 3)] 
4 Application P/23/1372 for Demolition of Double Garage (Conservation Area
Consent) at Vacant Land at Ladyacre Road, Lanark 
A report dated 20 May 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/1372 by West of Scotland Housing Association and
Zoom Developments Limited for the demolition of a double garage (conservation area consent)
at vacant land at Ladyacre Road, Lanark.
6

Page 7

There followed a discussion on the application during which officers responded to members’
questions on aspects of the report.  Councillor Nelson, seconded by Councillor Convery, moved
that the application be refused for the reason detailed in the Executive Director’s report. 
Councillor Scott, seconded by Councillor McDonald, moved that the application be deferred to a
future meeting of the Planning Committee to allow negotiations to continue with the applicant.   
On a vote being taken using the electronic voting system, 8 members voted for the amendment
and 11 for the motion which was declared carried. 
The Committee decided: that planning application P/23/1372 by West of Scotland
Housing Association and Zoom Developments Limited for
the demolition of a double garage (conservation area
consent) at vacant land at Ladyacre Road, Lanark be
refused for the reason detailed in the Executive Director’s
report. 
Councillor Ross joined the meeting during consideration of the above item of business and was,
therefore, unable to participate in the vote 
5 Application P/23/1373 for Demolition of Detached Double Garage and Erection of
39 Flats with Car Parking, Cycle Storage, Landscaping and Associated Facilities
at Vacant Land at Ladyacre Road, Lanark 
A report dated 20 May 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/1373 by West of Scotland Housing Association and
Zoom Developments Limited for the demolition of a detached double garage and erection of 39
flats with car parking, cycle storage, landscaping and associated facilities at vacant land at
Ladyacre Road, Lanark. 
The Committee decided: that planning application P/23/1373 by West of Scotland
Housing Association and Zoom Developments Limited for
the demolition of a detached double garage and erection of
39 flats with car parking, cycle storage, landscaping and
associated facilities at vacant land at Ladyacre Road,
Lanark be refused for the reasons detailed in the Executive
Director’s report. 
6 Application P/23/1543 for Demolition and Rebuild of 2-Storey House at 9
Sunningdale Wynd, Bothwell 
A report dated 20 May 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/1543 by A Waseem for the demolition and rebuild of
a 2-storey house at 9 Sunningdale Wynd, Bothwell. 
At its meeting on 12 March 2024, the Committee deferred the application to a future meeting to
allow further information to be provided regarding construction arrangements, in terms of public
safety on Sunningdale Wynd. 
Following discussion, during which an officer responded to members’ questions on various
aspects of the report, Councillor Nelson, seconded by Councillor Convery, moved that the
application be granted subject to the conditions specified in the Executive Director’s report. 
Councillor Devlin, seconded by Councillor Donnelly, moved as an amendment that the
application be deferred to allow a site visit to be carried out.  On a vote being taken using the
electronic voting system, 7 members voted for the motion, 1 member abstained and 12
members voted for the amendment which was declared carried.
7

Page 8

The Committee decided: that planning application P/23/1543 by A Waseem for the
demolition and rebuild of a 2-storey house at 9
Sunningdale Wynd, Bothwell be deferred to a future
meeting of the Planning Committee to allow a site visit to
be carried out. 
[Reference: Minutes of 12 March 2024 (Paragraph 12)] 
7 Urgent Business 
There were no items of urgent business. 
8

Page 9

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject Masterplan Consent Areas 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update members on current planning legislation on Masterplan Consent Areas
 seek approval for the Council’s statement on its approach to Masterplan Consent
Areas as set out in Appendix 1 of the report 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the statement setting out the Council’s approach to Masterplan Consent
Areas, as set out in Appendix 1 of the report, be approved. 
3.  Background
3.1. The Planning (Scotland) Act 2019 introduced the ability for Planning Authorities to
prepare Masterplan Consent Area (MCA) schemes for their area.  MCA schemes act
as a grant of authorisation of the following statutory consents for the carrying out of
development that is specified in the scheme:- 
 planning permission
 roads construction consent
 listed building consent
 conservation area consent 
The authorisation is subject to conditions, limitations and exceptions which can cover
matters such as design, environmental issues and development standards.  Within
adopted MCA areas, development can be brought forward without the need for the
submission of these applications if it is in line with the agreed scheme. 
3.2. MCAs will set out the Council’s aspirations for new development including new
construction and changes to the use of land and buildings which contribute towards
the regeneration of areas.  Matters that can be considered include infrastructure, new
roads and streets, energy developments, business development, new homes and
services, and conversions to bring empty buildings, including listed buildings back into
use.  The preparation of a MCA scheme would be led by the Council with collaboration
with stakeholders and would show the type and quality of development to be provided.    
3
9

Page 10

3.3. The Act sets out the legal framework for preparing MCAs, however, it should be noted
these provisions are not yet in force.  In association with this, the Scottish Government
recently published a consultation on draft regulations on the procedures to prepare
MCAs. 
4. Duty to Consider Making MCA Schemes
4.1. The Act places a duty on the Council to consider whether it is desirable to make an
MCA scheme at least once every 5 years.  It must publish a statement showing how
this duty has been fulfilled including what has been decided and the reasons for the
decision.  This must be carried out within 5 years of the Act receiving Royal Assent ie
24 July 2024. 
4.2. Guidance on this duty was published by the Scottish Government on 19 March 2024. 
It recognises that it will not be possible for any Planning Authority to make an MCA as
the Regulations are not in place.  However, it states authorities should still consider
how they wish to make use of the provisions once they are in effect. 
4.3. The guidance on preparing the statement includes suggested text that can be used to
reflect the current situation.  Two options are available.  Firstly, to cover cases where
an authority has held initial discussions with stakeholders and landowners and
developers about the potential to take forward an MCA.  Secondly, one that
acknowledges the Regulations are not in pace so that potential locations have not
been identified or assessed but that the position will be reviewed once the Regulations
have been published. 
5.  Next Steps
5.1. The Council is required by 24 July 2024 to fulfil its legal obligations under the Town
and Country Planning (Scotland) Act as amended, by providing either a Scheme for
Masterplan Consent Areas that have already been identified or a statement of intent
to reconsider the Council’s position once the regulations are in place. 
5.2. In a South Lanarkshire context, the appropriateness of bringing forward MCAs will be
fully assessed during the preparation of the proposed South Lanarkshire Local
Development Plan 3.  As a result, it is considered appropriate that the Council’s
statement be based on the second option described above.  The proposed statement
for the Council is attached as appendix 1 of the report. 
5.3. If members agree to this approach the statement will be published on the Council’s
website. 
6. Employee Implications
6.1. There are no additional employee implications in preparing the statement. 
7. Financial Implications
7.1. The carrying out of the duty to prepare the statement has no financial implications.  It
is noted, however, that no funding has been made available to Council’s should they
be considering introducing a Masterplan Consent Area. 
8. Climate Change, Sustainability and Environmental Implications 
8.1. The statement has no implications in terms of climate change, sustainability, or impact
on the environment. 
10

Page 11

9. Other Implications
9.1. The statement of intent is legislatively required and failure to comply by the date
required carries a reputational risk and challenge to a plan-led approach to site
delivery. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. The statement of intent is legislatively required to comply with the Planning (Scotland)
Act 2019 and, as such, is not required to be assessed in terms of its impact on equality
issues.  In addition, consultation is not required to be carried out. 
David Booth
Executive Director (Community and Enterprise Resources) 
17 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live 
Background Papers
 Planning (Scotland) Act 2019 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tony Finn, Planning and Building Standards Manager (Headquarters)
Ext:  5105  (Tel: 01698 455105)
E-mail: tony.finn@southlanarkshire.gov.uk 
11

Page 12

Appendix 1 
Background / Introduction 
The Planning (Scotland) Act 2019 introduced Masterplan Consent Areas (MCAs) as a new
proactive consenting mechanism. 
South Lanarkshire Council will in future be able to prepare Masterplan Consent Area
schemes as part of a placemaking approach to planning and consenting.  It is a new way
for the Council to shape new development in our area – enabling the type and quality of
development we wish to come forward through a consenting masterplan, and to support
delivery of development that can support local needs, priorities and outcomes. 
Unlike planning applications which are typically led by a developer, the preparation of MCA
schemes will be led by the planning authority but can be taken forward through
collaboration. 
The new provisions will allow the Council to prepare an MCA ‘Scheme’ setting out for
particular places, the detail of what they are giving consent for, through the MCA scheme.
There will be requirements for publicity and consultation on individual schemes. 
MCA schemes can streamline consent, allowing issues to be considered as part of a joined
up approach, they can grant:- 
• planning permission; 
• roads construction consent; 
• listed building consent; and 
• conservation area consent. 
Within adopted MCA areas, development could be brought forward without the need for a
full application as long as it is in line with the agreed scheme. 
Consideration of the Duty to periodically consider making MCA schemes 
Part 2 of the 2019 Act (Section 15) sets out the legal framework for preparing MCAs.  The
full provisions from the Act relating to MCAs and the associated regulations are not yet in
force.  It is anticipated that the MCA provisions will be fully in place later in 2024. 
Schedule 5A Paragraph 5 of the Act is in force and requires planning authorities to consider
whether it would be desirable to make a scheme for a part or parts of their district.   
As the MCA regulations are not yet in place, the Council has not yet identified or assessed
potential locations for which it may be desirable to bringing forward an MCA scheme.  It is
intended to consider this once the legal basis for preparing MCAs is in place. 
The Scottish Government has indicated that MCAs could be used to support delivery of the
local development plan.  The Council will consider whether it would be desirable to make
any Masterplan Consent Areas as part of the work on the preparation of its Local
Development Plan 3. 
This Statement fulfils the Council’s legal requirements under Schedule 5A Paragraph 5 of
the Town and Country Planning (Scotland) Act, as amended. 
12

Page 13

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/21/0225
Proposal:  Importation of Inert Waste to Remediate Former Reservoir to
Woodland Including Operation of an Inert Construction Waste
Recycling Facility 
Site Address:  Boghead Reservoir 
Bellscroft Road
Boghead
Lanark 
Applicant:  Enviro-Clean (Scotland) Limited
Agent:  AED Consultant Services Ltd
Ward:  04 – Clydesdale South
Application Type:  Detailed Planning Application
Advert Type:  Non-notification of neighbours: Lanark Gazette 23 February 2021
Bad Neighbour: Lanark Gazette 23 February 2021 
Development Plan
Compliance: 
No 
Departures:  Not applicable
Recommendation:  Refuse 
Legal Agreement:  Not applicable
Direction to
Scottish Ministers 
No 
4
13

Page 14

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015 as it constitutes a major planning application. 
2. Site Description
2.1. The application site consists of the former Boghead Reservoir which was constructed
in the 1920’s but ceased to be used as a reservoir in the 1980s and was subsequently
used by Scottish Water as a storage depot. The site was sold in 1999 since when parts
of the site have been subject to clay extraction. 
2.2. The site is 3.5km to the south west of Kirkmuirhill and extends to 7.5 hectares in area.
It is served by a private access road and the surrounding area is predominantly
agricultural and forestry plantation with active mineral extraction being carried out 1km
to the west at Dunduff Quarry. There are a number of residential properties within 1km
of the site, the nearest being Bellscroft which is 570m from the reservoir and 45m from
the access road.       
3. Description of Proposed Development
3.1. The application proposes the restoration of the former reservoir and the infilling of the
reservoir bowl with inert aggregate waste. It is suggested that an average of 150,000
tonnes of inert material will be imported per annum which would mean a period of 10
years being required to complete the proposed works. It is also proposed to reclaim
and recycle any inert materials that can be reused by the construction industry. This
would involve a crushing and screening process and the provision of on-site plant and
machinery. Once the infilling is complete the site would be restored to a mix of meadow
and woodland. 
4. Relevant Planning History
4.1. There have been no recent applications for development at the application site. A
range of works not requiring planning permission were carried out as part of the
process for removing the reservoir from the reservoir register. 
5. Supporting Information 
5.1. The applicant has submitted a number of supporting documents with the application,
including a supporting statement which addresses a range of issues.   
6. Consultations
6.1. Environmental Services – no objections subject to compliance with environmental
standards on noise and dust. 
Response:  Noted. These matters could be covered by condition if consent were
granted. 
6.2. Lesmahagow Community Council – raise a number of concerns including:- 
 Dusts and noise levels
 The access road being used by local walkers
 Increased traffic
 Potential flood risk
 The type of materials to be processed 
Response:  Noted. 
6.3. Roads and Transportation Services – having considered the Transport Statement
submitted with the application recommend the deferral of a decision until a range of
concerns have been considered and addressed by the applicants. These include:-
14

Page 15

 The existing carriageway widths on Bellscroft Road will not support two way HGV
movement and result in verge overrun and damage to the public road
 Conflict with existing residential traffic and walkers
 Conflict with the operations of the nearby Dunduff Quarry. The applicant should
carry out an assessment of the haul route between the B7078 and A71.
 Clarification on whether abnormal loads will be required
 Detailed drawings and a Road Safety Audit should be submitted for the access
proposals
 Further details of sightlines that can be achieved should be submitted including
evidence that third party agreement has been reached where necessary
 Further assessment should be carried out in terms of the potential traffic impact
throughout the area 
Response:  Noted. The applicant has been advised about these comments but to date
no response has been received. 
6.4. Flood Management (Roads and Transportation Services) – a Flood Riak assessment
should be submitted. 
Response: The applicant has been advised about these comments but to date no
response has been received. 
7. Representations
7.1. Following the advertisement of the application in the local paper and the carrying out
of neighbour notification, 393 letters of objection were received. The issues raised are
summarised as follows:- 
 Impact on the amenity of local residents and the wider area
 Additional traffic through local villages and past Bent Primary School
 Impact on biodiversity
 Impact on local walkers
 Increase in pollution
 The site would become a dumping ground for inert waste 
The above issues are considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. The development plan comprises the
adopted National Planning Framework 4 and the adopted South Lanarkshire Local
Development Plan 2. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 12 – Zero Waste  
15

Page 16

8.3. South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development
 Policy 15 - Travel and Transport
 Policy 16 - Water Environment and Flooding
 Policy 17 – Waste 
9. Guidance
9.1. None 
10. Assessment and Discussion
10.1. The application proposes the restoration of the former Boghead reservoir and the
infilling of the reservoir bowl with inert aggregate waste. It is also proposed to reclaim
and recycle any inert materials that can be reused by the construction industry. This
would involve a crushing and screening process. Once the infilling is complete the site
would be restored to a mix of meadow and woodland. 
10.2. Policy 12 - Zero Waste in National Planning Framework 4 states that, in general terms,
development proposals will seek to reduce, reuse, or recycle materials in line with the
waste hierarchy. They will be supported where they minimise demolition and salvage
materials for reuse; minimise waste, reduce pressure on virgin resources and enable
building materials, components and products to be disassembled, and reused at the
end of their useful life; use materials with the lowest forms of embodied emissions,
such as recycled and natural construction materials; and use materials that are
suitable for reuse with minimal reprocessing. 
10.3. In addition, proposals for waste infrastructure and facilities will be only supported
where there are no unacceptable impacts (including cumulative) on the amenity of
nearby dwellings, local communities; the transport network; natural and historic
environment assets; environmental (including cumulative) impacts relating to noise,
dust, smells, pest control and pollution of land, air and water are acceptable; any
greenhouse gas emissions resulting from the processing and transportation of waste
to and from the facility are minimised; an adequate buffer zone between sites and
sensitive uses such as homes is provided taking account of the various environmental
effects likely to arise; and a restoration and aftercare scheme (including appropriate
financial mechanisms) is provided and agreed to ensure the site is restored. 
10.4. Policy 17 – Waste in the adopted South Lanarkshire Local Development Plan 2 states
the Council will ensure that proposals for waste management facilities such as landfill
and waste recycling will be assessed against a range of criteria including impact on
local communities and the natural and historic environment; local environmental
effects such as noise, dust, odour, air quality and water contamination; the hours of
operation; traffic volumes and the impact on the local road network and road safety;
and suitability of restoration and aftercare proposals. In addition, Policy 5 –
Development Management and Placemaking states that proposals should have no
unacceptable impact on the local community and the environment. In particular,
development should provide suitable access and have no adverse implications for
public safety. As well as these policies others set out in 8.3 above are also relevant. 
16

Page 17

10.5. In very general terms the infilling of the former reservoir with inert material together
with the reclamation and recycling of this material for use in the construction industry
accords broadly with the planning policy position on this form of development. 
10.6. Nevertheless, the appropriateness of the proposed development in respect of a wide
range of criteria must be demonstrated for the proposals to be acceptable. In this
particular case Roads, Transportation and Fleet Services have raised a number of
issues that require to be addressed and these are summarised above.  The applicants
have been advised of these concerns but to date have failed to submit additional
information to allow a full assessment of the impact on the local road network and road
safety to be carried out. Similarly, a flood risk assessment requested by the Flood
Management Team has also not been provided. 
10.7. A significant amount of objection has been received from local residents and from
Lesmahagow Community Council. Among the concerns raised are the impact of the
increased traffic levels on local roads and nearby settlements with reference being
made to the proximity of Bent Primary school to the haul route and the use of the area
by local walkers. In addition, the potential flood risk associated with the proposals has
also been highlighted as a concern. 
10.8. The failure of the applicants to submit information to address these issues has meant
the application remains undetermined 3 years after being first received. It is
considered appropriate to now determine the application. The assessment in this
report focusses predominantly on the implications of the proposals on road safety and
flood risk and the inability to fully assess this aspect of the application. A detailed
assessment against other criteria has not been carried out due to the fundamental
concerns about the impact on these two key issues. 
10.9. Conclusion 
In conclusion, the failure of the applicant to submit additional information means it has
not been demonstrated that the proposed development complies with the
Development Plan. It is considered to be contrary to Policy 12 – Zero Waste of National
Planning Framework 4 (NPF4) and Policies 5 – Development Management and
Placemaking and 17 - Waste of the adopted South Lanarkshire Local Development
Plan 2.  It is, therefore, recommended that the Planning Committee refuse the
application. 
11. Recommendation and Reason
11.1. The Committee is asked to agree the following recommendation:- 
Refuse the application for the following reason:- 
01. The applicant has failed to submit additional information in respect of the impact
of the proposed development on road safety and flood risk. As a result, the
proposals are contrary to Policy 12 – Zero Waste of National Planning
Framework 4 (NPF4) and Policies 5 – Development Management and
Placemaking and 17 - Waste of the adopted South Lanarkshire Local
Development Plan 2 as it has not been demonstrated that there would not be
an adverse impact on road safety and flood risk. 
17

Page 18

David Booth
Executive Director (Community and Enterprise Resources) 
Date:  17 June 2024 
Background Papers
Further information relating to the application can be found online:-
P/21/0225 | Importation of inert waste to remediate former reservoir to woodland including operation
of an inert construction waste recycling facility | Boghead Reservoir - Disused Bellscroft Road
Boghead Lanark South Lanarkshire 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
18

Page 19

19

Page 20

20

Page 21

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/22/1224
Proposal:  Extraction and Processing of Hard Rock Aggregates by Quarrying
Methods - Section 42 Application to Vary Condition 41 (Relocation of
Ethylene Pipeline) and Condition 43 (Confirmation of Predicted
Vibration Levels) of Planning Permission P/20/0514 
Site Address:  Duneaton Quarry
B7078 from Millbank to Abington
Crawfordjohn
South Lanarkshire 
Applicant:  Mr Alistair Hodge, Hodge Plant Ltd 
Agent:  Mr William Booth, Dalgleish Associates Ltd
Ward:  03 – Clydesdale East
Application Type:  Modification, Variation or Removal of Planning Condition
Advert Type:  EIA Report Submitted: Edinburgh Gazette 30 September 2022
Environmental Impact Assessment (EIA) Report Submitted: Lanark
Gazette 28 September 2022 and 15 May 2024
Non-notification of neighbours: Lanark Gazette 28 September 2022
and 15 May 2024
Bad Neighbour: Lanark Gazette 28 September 2022and 15 May 2024 
Development Plan
Compliance: 
No 
Departures:  Not applicable
Recommendation:  Refuse 
Legal Agreement:  Not applicable
Direction to
Scottish Ministers 
No 
5
21

Page 22

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015 as it constitutes a major planning application. 
2. Site Description
2.1. The application site consists of an existing hard rock quarry (Duneaton Quarry) which
is located to the north of the B7078, approximately 800m west of the Abington Services
at Junction 13 of the M74 motorway, some 1.6km to the northwest of the settlement
of Abington.  The quarry is approximately 12.8 hectares in area.  Access is taken
directly from the quarry onto the B7078. 
2.2. Quarrying commenced in 2009 and extraction is currently permitted until June 2029,
following which the site is proposed to be restored. The quarry produces Greywacke
(a variety of sandstone) that is used for a range of products in the construction industry,
including road surfacing and concrete. 
2.3. The application site is on land designated as Rural Area within the adopted South
Lanarkshire Local Development Plan 2. A high-pressure gas pipeline, the North West
Ethylene Pipeline, owned and operated by Shell Chemicals UK Limited, crosses the
south east corner of the application site. This underground pipeline was constructed
in 1991/92 and transports Ethylene gas south from Grangemouth to the operator’s
petrochemicals plant at Stanlow in Chesire.     
3. Description of Proposed Development
3.1. The application is made under Section 42 of the Town and Country Planning
(Scotland) Act 1997 (as amended) and is an application for planning permission for
the development of land but without compliance with a condition or conditions attached
to a previous planning permission. 
3.2. The applicant originally sought to delete condition 4 and to vary the wording of
condition 43 attached to planning permission P/20/0514 (a previous Section 42
application for the operational quarry to amend/extend the original approved extraction
area). 
3.3. Condition 41 of application P/20/0514 states:- 
“That before this planning permission is implemented on site, the ethylene pipeline
(North West Ethylene Pipeline) shall be relocated fully outwith the site boundary.
Details demonstrating the safe relocation of the pipeline, including all required
authorisations from the Health and Safety Executive shall be submitted for the written
confirmation of the Planning Authority.” 
The applicant had requested that this condition be deleted. However, they
subsequently sought to vary the wording of condition 41 to read as follows:- 
In implementing this planning permission, the operator shall provide evidence to the
Planning Authority on an ongoing basis that the operator is in full compliance with the
relevant requirements of the Mining Code as applied in an adapted form by the
Servitude. Without prejudice to the generality of the foregoing, prior to working
minerals within the Area of Protection the operator shall provide the Council with a
copy of the Notice of Intention served on Shell and confirm that no Counter Notice was
served by Shell within the period afforded to Shell under the Mining Code as adapted
by the Servitude. In the event that Shell serves a valid Counter Notice, the operator
shall not work minerals within the Area of Protection to the extent stipulated under the
Counter Notice unless Shell subsequently withdraws the Counter Notice. 
22

Page 23

In this condition:- 
“Mining Code” means (i) the provisions of Part II of and the First, Second and Third
Schedules to the Mines (Working Facilities and Support) Act 1923 which were
substituted in place of Sections 71 to 78 inclusive of the Railway Clauses
Consolidation (Scotland) Act 1845 or (ii) Sections 71 to 78 inclusive of the Railway
Clauses Consolidation (Scotland) Act 1845 as they are in force during the period of
this planning permission to the extent that such provisions include more stringent
provisions regarding the protection of the pipeline than the provisions of the Mining
Code as introduced in the said 1923 Act. 
“Servitude” means the Grant of Servitude containing Disposition by George Hodge to
Shell Chemicals UK Limited, recorded in the General Register of Sasines for the
County of Lanark on 6 February 1992 and which is now registered against the subjects
registered in the Land Register of Scotland under Title Number LAN 22964. 
“Shell” means Shell UK Limited or any other entity which from time to time is the
“Company” as defined in the Servitude. 
“Area of Protection”, “Notice of Intention” and “Counter Notice” have the meanings
given in the Mining Code as adapted by the Servitude. 
3.4. Condition 43 of planning application P/20/0514 states:- 
“That before this planning permission is implemented on site but following the
relocation of the pipeline required by condition 41, the operator shall obtain, and
provide to the Planning Authority, written confirmation from Shell UK that the predicted
vibration levels at their apparatus within the vicinity of the site are within parameters
acceptable to them.” 
The applicant has requested that condition 43 be varied to read:- 
“Vibration levels from the development authorised by this permission when measured
at the relocated Shell pipeline shall not exceed 50 mm/s ppv.”   
3.5. If successful, the effect of a Section 42 application to modify a planning condition or
conditions is to grant a further planning permission for the whole development but with
the amended condition or conditions replacing those that were previously issued, or
with conditions removed if required.  All other conditions, if relevant, are also required
to be attached to any new planning permission.  If the proposed changes to the
condition or conditions are deemed unacceptable, then Section 42 of the Act requires
the application to be refused.  Any refusal of an application under Section 42 of the
Act does not have any effect on the original planning permission which remains intact. 
4. Relevant Planning History
4.1. An application for planning permission (CL/07/0070) was granted on 4 December 2007
for the extraction and processing of hard rock aggregates by quarrying methods
subject to a legal agreement.  Following completion of the legal agreement, planning
permission was issued on 2 March 2009.  The permission was granted with an
extraction period of 20 years and 3 months from the date of commencement with a
further year allowed for restoration of the site.    
23

Page 24

4.2. In 2012 an application (CL/12/0236) was made for the formation of a materials
recycling facility within the quarry. This application was recommended for approval
subject to a legal agreement but was withdrawn at the applicant’s request prior to any
decision being made on the application. 
4.3. In November 2020, Planning Committee approved a Section 42 Planning Application
to amend condition 4 of the original planning permission to allow the quarry extraction
area to extend into a southern area that had not previously been identified for
extraction (P/20/0514). 
4.4. Planning permission was granted in December 2021 for the part change of use of the
quarry to allow the recycling of construction waste within an area that had already
been worked (P/21/0106). 
4.5. A further Section 42 (P/23/1293) has now been submitted by the applicant to permit
an extended period for the extraction of reserves from 2 June 2029 to 2 June 2036.
This application is the subject of a separate report on the agenda. 
5. Supporting Information 
5.1. The applicant has submitted a number of supporting documents with the application,
including a series of supporting statements setting out the justification for the
application, and copies of the original submitted Environmental Statement (ES)
documents and figures for the site.   
6. Consultations
6.1. Environmental Services – no response to date on the consultation request.
Response:  Noted. 
6.2. Health and Safety Executive (HSE) – provided standard advice in relation to proximity
to pipelines and directed the Council to their online enquiry web app for determining
whether they would advise against or not advise against certain developments in
relation to their proximity to a pipeline.  Following completion of the web app in relation
to the proposals, the HSE advice was ‘Do not advise against’.  Whilst the HSE web
app did not advise against the proposals in relation to the site’s proximity to
underground pipelines, the existing Shell UK pipeline would require to be relocated
before any work could commence on the new extraction area.  Although noting that
the HSE do not advise against the proposals, it is also noted in their response that
they advise that the Council should consider contacting the pipeline operator (Shell
UK) before deciding the case.
Response:  Noted. 
6.3. Shell UK Oil – object to the original proposal to delete the conditions and the
subsequent change to the description of the proposal to amend the wording of
condition 41. They state that both planning conditions are required to remain on any
approval for the quarry operation, in the interest of public safety. A summary of their
reasoning for objecting to the application is set out in section 10 below. 
Response:  Noted. 
7. Representations
7.1 Following the advertisement of the application in the local paper and the Edinburgh
Gazette, both at the time of the original submission and the subsequent amendment
to the description of the application, no letters of representation have been received.  
24

Page 25

8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. The development plan comprises the
adopted National Planning Framework 4 and the adopted South Lanarkshire Local
Development Plan 2. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 23 - Health and Safety
 Policy 33 - Minerals 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development
 Policy 15 - Travel and Transport
 Policy 16 - Water Environment and Flooding
 Policy 19 - Minerals Development
 Policy MIN1 - Settlements
 Policy MIN2 - Cumulative Impact
 Policy MIN3 - Restoration
 Policy MIN5 - Controlling Impacts from Extraction Sites
 Policy MIN6 - Community Benefit   
9. Guidance
9.1. Planning Circular 3/2015 – Planning Controls over Hazardous Substances states that
the aims of European Directive 2012/18/EU must be taken into account in planning
decisions by ensuring appropriate safety distances between major hazards and
development are maintained. 
9.2. Planning Circular 4/1998 – Use of Conditions states that, in relation to section 42
applications, the planning authority can refuse the application if they decide the original
conditions should continue. In all cases conditions should meet 6 tests ie they should
be:- 
 Necessary
 Relevant to planning
 Relevant to the development to be permitted
 Enforceable
 Precise
 Reasonable in all other aspects  
25

Page 26

10. Assessment and Discussion
10.1. The application has been made under section 42 of the Planning Act to vary the
wording of two conditions attached to the planning permission for the quarrying
operations at Duneaton Quarry. Under the terms of Section 25 of the Town and
Country Planning (Scotland) Act 1997, all applications must be determined in
accordance with the development plan unless material considerations indicate
otherwise.  The policies contained within National Planning Framework 4 and the
South Lanarkshire Local Development Plan 2 are the main consideration in this case,
together with an assessment of any other material planning considerations. 
10.2. As the proposals involve amendments to an existing consent there is no need to revisit
the principle of the development, or any facets of the original consent that do not form
part of the proposed amendments.  Therefore, in this instance, the assessment of the
proposals relates solely to consideration of any impacts that may arise from the
variation of the 2 conditions referred to. The main matters for the Council’s
consideration are therefore whether the quarry operations would continue to comply
with the Development Plan.  No changes to the scale, design or layout of the previously
approved minerals extraction scheme are proposed. 
10.3. In terms of the Development Plan, Policy 5 – Development Management and
Placemaking of the South Lanarkshire Local Development Plan 2 states that proposals
should have no significant adverse impacts on the local community and the
environment and have no adverse implications for public safety. Policy 19 – Minerals
Development states that all proposals associated with mineral extraction must be
carried out with minimum impact and appropriate mitigation. Similarly, Policy MIN5 –
Controlling impacts from extraction sites states that the Council will seek to ensure
that all applications for mineral development will not create an unacceptable impact
through the generation of noise, dust, vibration, air, and light pollution. 
10.4. Since the granting of the original consent National Planning Framework 4 has been
adopted by the Scottish Government. Policy 23 – Health and Safety states that
proposals within the vicinity of a major accident hazard pipeline should consider the
potential impacts of the proposal and the major accident hazard site/pipeline of being
located in proximity to one another. This is in order to protect people and places from
harm and hazards. Policy 33 – Minerals states proposals for the extraction of minerals
will only be supported where they demonstrate that levels (including cumulative
impact) of noise, dust, vibration and potential pollution of land, air and water will be
acceptable.  In addition, Planning Circular 3/2015 – Planning Controls over Hazardous
Substances and Planning Circular 4/1998 – Use of Conditions are relevant. 
10.5. A number of supporting documents have been submitted by the application in support
of the application. They highlight that, whilst the pipeline is owned and operated by
Shell UK, the applicant is the landowner and there is a legal agreement (deed of
servitude) between both parties. The applicant considers that this deed of servitude
with Shell allows them to insist on the relocation of the pipeline to allow their previously
approved extraction scheme to commence. The statement also states that the
applicant has endeavoured to work with Shell UK, however, the approach taken by
Shell UK necessitates the making of this application. Reference is also made to the
Mining Code, which is stated as being a clause within the deed of servitude. The
Mining Code explains that an area of protection is identified around pipelines, within
which the mineral operator is required to serve a Notice of Intention (to work minerals).
However, the pipeline owner may serve a counter notice on the mineral operator,
preventing mineral works and offering compensation (value based on the agricultural
use of the site when the pipeline was installed). They are seeking the variation of
condition 41 to accommodate this situation.                
26

Page 27

10.6. The applicant’s supporting statement also states that the current wording of Condition
43 has the potential to frustrate the intended working of The Mining Code in that it
envisages the pipeline being relocated before the 2020 planning permission can be
implemented. The purpose of the condition is to ensure that quarrying operations,
particularly blasting, do not result in vibration levels at the pipeline which exceeds safe
limits. The applicant is seeking to make the wording of the condition more prescriptive,
incorporating a maximum vibration level of 50mm/sec Peak Particle Velocity.  
10.7. The owner and operator of the pipeline, Shell UK have formally objected to the
proposals, stating that the conditions were imposed by the Council in the interests of
public safety and are directly linked to the safe operation of the pipeline. Having
assessed the information submitted by the applicant, Shell UK consider the proposed
changes to the conditions could have serious and significant implications for the
pipeline and object to the application and there would be no planning control over the
proposed quarry extension in respect of the pipeline. They conclude that conditions
41 and 43 were specifically imposed in the interests of public safety and issues of
potential compensation are not a matter of public interest or a material planning
consideration. 
10.8. The implementation of planning permission P/20/0514 to extend the area of quarrying
requires the relocation of an existing portion of the Shell UK’s North West Ethylene
Pipeline. The issue of whether the use of conditions to ensure the pipeline is relocated
before work starts on quarrying in the area affected by the pipeline is appropriate was
addressed fully in the report on that application to the Planning Committee in
November 2020.  The report highlighted that planning permission was being sought
for mineral extraction once the pipeline has been relocated, not whether it is
acceptable to relocate the pipeline or to extract minerals whilst the pipeline is in situ.
The view taken at the time was that the conditions are necessary to protect public
safety. The Local Development Plan remains extant as do the two circulars referred
to above. In addition, the policy position in NPF4 reinforces the original decision in
relation to the two conditions. The applicants had the opportunity to appeal to Scottish
Ministers to delete the conditions but did not. 
10.9. There is a legal agreement (deed of servitude) between both the applicants and Shell
regarding the pipeline. The applicant continues to assert that the deed of servitude
with Shell allows them to insist on the relocation of the pipeline to allow extraction to
take place in the area where consent has been granted to extend quarrying activity.
However, the view was taken at that time that this is a separate legal matter and does
not relate to the Council’s function which is to decide whether or not a proposed
development is acceptable and/ or desirable in the public interest. It is not for the
Council to review ownership agreements, such as deeds of servitude, to consider their
competency or come to a view as to their enforceability when determining a planning
application. Rather it has a responsibility to ensure the quarry operates in a manner
that is not detrimental to public safety. 
10.10. In this respect Circular 4/1998 on the Use of Conditions states that a condition that
duplicates the effect of other controls is normally unnecessary. This relates to matters
that are controlled by other legislation. It does not extend to private legal agreements.
The Council as the Planning Authority does not have a role in resolving disputes
between third parties. 
10.11. Circumstances since the original decision remain unchanged and the conditions as
currently worded are still considered appropriate and reasonable. The existence of a
private legal agreement between the parties is not considered to provide sufficient
comfort to ensure public safety and therefore, in planning terms, a significant public
27

Page 28

safety issue would be outwith planning control if the conditions are deleted. Indeed,
the applicants acknowledge that this matter is essentially a private legal matter and
does not relate to the function of the Council, which is to decide whether or not a
proposal is acceptable in the overall public interest. In this case there is no guarantee
that public safety will continue to be protected. 
10.12. Conclusion 
In conclusion, following a detailed assessment, it is considered that the variation of
conditions 41 and 43 of planning permission P/20/0514 is unacceptable as it would
result in a form of development that would not be subject to adequate planning control
to ensure public safety is protected. The proposed deletion of condition 41 is therefore
considered to be contrary to policies 23 - Health and Safety and 33 - Minerals of
National Planning Framework 4 (NPF4) and policies 5 - Development Management
and Placemaking, 19 - Minerals and MIN5 - Controlling Impacts from Extraction Sites
of the adopted South Lanarkshire Local Development Plan 2.  It is, therefore,
recommended that the Planning Committee refuse the application. 
11. Recommendation and Reason
11.1. The Committee is asked to agree the following recommendation:- 
Refuse the further application for the following reason:- 
01. The variation of Conditions 41 and 43 of planning permission P/20/0514 as
proposed is considered unacceptable as it would result in a form of
development that would not be subject to adequate planning control to ensure
public safety is protected.  It would therefore be contrary to policies 23 - Health
and Safety and 33 - Minerals of National Planning Framework 4 (NPF4) and
policies 5 - Development Management and Placemaking, 19 - Minerals and
MIN5 - Controlling Impacts from Extraction Sites of the adopted South
Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  17 June 2024 
Background Papers
Further information relating to the application can be found online:-
https://publicaccess.southlanarkshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summaryandkeyVal=RH6NDNOPH5100 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
28

Page 29

29

Page 30

30

Page 31

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/1293
Proposal:  Extraction and Processing of Hard Rock Aggregates by Quarrying
Methods (Section 42 Application to Vary Condition 1 of Planning
Permission P/20/0514, to Permit an Extended Period for the
Extraction of Reserves from 2 June 2029 to 2 June 2036) 
Site Address:  Duneaton Quarry
B7078 from Millbank to Abington
Crawfordjohn
Biggar
South Lanarkshire 
Applicant:  Mr Alistair Hodge, Hodge Plant Ltd 
Agent:  Mr William Booth, Dalgleish Associates Ltd
Ward:  03 – Clydesdale East
Application Type:  Modification, Variation or Removal of Planning Condition
Advert Type:  Non-notification of neighbours: Lanark Gazette 31 October 2023
Bad Neighbour: Lanark Gazette 31 October 2023 
Development Plan
Compliance: 
Yes 
Departures:  Not applicable
Recommendation:  Grant subject to conditions
Legal Agreement:  Not applicable
Direction to
Scottish Ministers 
No 
6
31

Page 32

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015 as it constitutes a major planning application. 
2. Site Description
2.1. The application site consists of an existing hard rock quarry (Duneaton Quarry) which
is located to the north of the B7078, approximately 800m west of the Abington Services
at Junction 13 of the M74 motorway, some 1.6km to the north west of the settlement
of Abington.  The quarry is approximately 12.8 hectares in area.  Access is taken
directly from the quarry onto the B7078. 
2.2. Quarrying commenced in 2009 and extraction is currently permitted until June 2029,
following which the site is proposed to be restored. The quarry produces Greywacke
(a variety of sandstone) that is used for a range of products in the construction industry,
including road surfacing and concrete. 
2.3. The application site is on land designated as Rural Area within the adopted South
Lanarkshire Local Development Plan 2 (2021). A high-pressure gas pipeline, the North
West Ethylene Pipeline, owned and operated by Shell Chemicals UK Limited, crosses
the south east corner of the application site. This underground pipeline was
constructed in 1991/92 and transports Ethylene gas south from Grangemouth to the
operator’s petrochemicals plant at Stanlow in Chesire.     
3. Description of Proposed Development
3.1. The application is made under Section 42 of the Town and Country Planning
(Scotland) Act 1997 (as amended) and is an application for planning permission for
the development of land but without compliance with a condition or conditions attached
to a previous planning permission. 
3.2. The applicant seeks to vary condition 1 attached to planning permission P/20/0514 (a
previous Section 42 application for the operational quarry to amend/extend the original
approved extraction area). This condition states:- 
“That all extraction operations on the site shall be discontinued no later than 2 June
2029 and that, within a period of 12 months from this discontinuance date, the entire
site shall be restored in accordance with the approved restoration scheme (as required
by condition 2) to the satisfaction of the Council as Planning Authority.” 
3.3. The applicant is proposing to extend the extraction period for a further seven years ie
2 June 2036. 
3.4. If successful, the effect of a Section 42 application to modify a planning condition or
conditions is to grant a further planning permission for the whole development but with
the amended condition or conditions replacing those that were previously issued, or
with conditions removed if required.  All other conditions, if relevant, are also required
to be attached to any new planning permission.  If the proposed changes to the
condition or conditions are deemed unacceptable, then Section 42 of the Act requires
the application to be refused.  Any refusal of an application under Section 42 of the
Act does not have any effect on the original planning permission which remains intact. 
4. Relevant Planning History
4.1. An application for planning permission (CL/07/0070) was granted on 4 December 2007
for the extraction and processing of hard rock aggregates by quarrying methods
subject to a legal agreement.  Following completion of the legal agreement, planning
permission was issued on 2 March 2009.  The permission was granted with an
32

Page 33

extraction period of 20 years and 3 months from the date of commencement with a
further year allowed for restoration of the site.   
4.2. In 2012 an application (CL/12/0236) was made for the formation of a materials
recycling facility within the quarry. This application was recommended for approval
subject to a legal agreement but was withdrawn at the applicant’s request prior to any
decision being made on the application. 
4.3. In November 2020, Planning Committee approved a Section 42 Planning Application
to amend condition 4 of the original planning permission to allow the quarry extraction
area to extend into a southern area that had not previously been identified for
extraction (P/20/0514). 
4.4. Planning permission was granted in December 2021 for the part change of use of the
quarry to allow the recycling of construction waste within an area that had already
been worked (P/21/0106). 
4.5. A further Section 42 (P/22/1224) has been submitted seeking to vary the wording of
conditions 41 and 43 attached to planning permission P/20/0514. This application is
the subject of a separate report on the agenda. 
5. Supporting Information 
5.1. The applicant has submitted a number of supporting documents with the application,
including copies of the original submitted Environmental Statement (ES) documents
and figures for the site.   
6. Consultations
6.1. Roads, Transportation and Fleet Services – no objections subject to the imposition of
the Roads related conditions attached to the original consent. 
Response:  Noted. 
6.2. Nature Scot – no objections subject to earlier Protection Plans and Restoration Plans
being reviewed and updated where necessary.
Response:  Noted. This can be addressed by a condition. 
6.3. Shell UK Oil – No objections subject to conditions 41 and 43 on the original consent
being retained.  
Response:  Noted. The conditions in question were imposed to ensure a pipeline
operated and owned by Shell is relocated before quarrying operations move into the
area affected by the pipeline. The varying of the wording is subject to a separate
application which is reported on elsewhere on the agenda. 
7. Representations
7.1. Following the advertisement of the application in the local paper no letters of
representation have been received. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. The development plan comprises the
adopted National Planning Framework 4 and the adopted South Lanarkshire Local
Development Plan 2.  
33

Page 34

8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 23 - Health and Safety
 Policy 33 - Minerals 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development
 Policy 15 - Travel and Transport
 Policy 16 - Water Environment and Flooding
 Policy 19 - Minerals Development
 Policy MIN1 - Settlements
 Policy MIN2 - Cumulative Impact
 Policy MIN3 - Restoration
 Policy MIN5 - Controlling Impacts from Extraction Sites
 Policy MIN6 - Community Benefit   
9. Guidance
9.1. Planning Circular 3/2015 – Planning Controls over Hazardous Substances states that
the aims of European Directive 2012/18/EU must be taken into account in planning
decisions by ensuring appropriate safety distances between major hazards and
development are maintained. 
9.2. Planning Circular 4/1998 – Use of Conditions states that, in relation to section 42
applications, the planning authority can refuse the application if they decide the original
conditions should continue. In all cases conditions should meet 6 tests ie they should
be:- 
 Necessary
 Relevant to planning
 Relevant to the development to be permitted
 Enforceable
 Precise
 Reasonable in all other aspects 
10. Assessment and Discussion
10.1. Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. The policies contained within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2 are the
main considerations in this case, together with an assessment of any other material
planning considerations. 
34

Page 35

10.2. In this case the application is made under section 42 of the Act to vary a condition to
restrict quarrying operations until 2 June 2029 at Duneaton Quarry. As the proposals
involve an amendment to an existing live consent, there is no opportunity for the
Planning Authority to revisit the principle of the development, or any facets of the
original permission.  Therefore, in this instance, the assessment of the proposals
relates solely to consideration of any impacts that may arise from an extension of the
quarrying period by the further 7 years proposed. The main matters for the Council’s
consideration are, therefore, whether the development would continue to comply with
the Development Plan based on a further period of quarrying. 
10.3. The reference to the quarrying ceasing in 2029 was first made in the decision made
on the planning application that established the quarry (CL/07/0070). The applicant
has advised that it was anticipated an average annual production rate of 195,000
tonnes per annum would be achieved. However, this figure has only been reached
once since the start of operations in 2009 and the average output is 125,000 tonnes
per annum. This has resulted in a current reserve of 1.6m tonnes which, based on the
average output of 125,000 tonnes annually, equates to around 13 years of production. 
10.4. The proposal has been assessed against the relevant policies in the Development
Plan. Policy 5 – Development Management and Placemaking of the South Lanarkshire
Local Development Plan 2 states that proposals should have no significant adverse
impacts on the local community and the environment and have no adverse
implications for public safety. Policy 19 – Minerals Development states that all
proposals associated with mineral extraction must be carried out with minimum impact
and appropriate mitigation. Similarly, Policy MIN5 – Controlling impacts from extraction
sites states that the Council will seek to ensure that all applications for mineral
development will not create an unacceptable impact through the generation of noise,
dust, vibration, air, and light pollution. 
10.5. In terms of National Planning Framework 4 Policy 33 – Minerals states proposals for
the extraction of minerals will be supported where they do not result in significant
adverse impacts on biodiversity, geodiversity and the natural environment, sensitive
habitats and the historic environment, as well as landscape and visual impacts; can
demonstrate that there are no significant adverse impacts (including cumulative
impact) on any nearby homes, local communities and known sensitive receptors and
designations; demonstrate acceptable levels (including cumulative impact) of noise,
dust, vibration and potential pollution of land, air and water; minimise transport impacts
through the number and length of lorry trips and by using rail or water transport
wherever practical; and include schemes for a high standard of restoration and
aftercare and commitment that such work is undertaken at the earliest opportunity. 
10.6. The appropriateness of establishing a hard rock quarry has been determined through
the various planning applications submitted to the Council which included a significant
range of environmental information being provided. The planning permissions are also
subject to a suite of conditions which control and manage the ongoing quarrying
activity.  There has been no adverse impact on the environment, amenity or the road
network since quarrying began. The applicant has explained the extension of the
period to cease operations has been driven by production rates not being as extensive
as originally anticipated. The proposal to extend the quarrying activity by 7 years is
considered acceptable and accords with the provisions of the Development Plan. The
same conditions would be attached to the new decision notice if consent is granted. 
10.7. In view of the above assessment, it is considered that the proposals to extend the
extraction period would not have an adverse impact on the environment, residential
amenity and road safety. The recommendation is therefore to approve the application
35

Page 36

which in turn will result in a new standalone planning permission being granted. The
original conditions would be attached to the decision notice including conditions 41
and 43 which are the subject of a separate report at this Committee. 
10.8. Conclusion 
In conclusion, it is considered that the proposed development is acceptable, and that
planning permission be granted, subject to the conditions detailed below. The
proposals are considered to be in accordance with the relevant policies of the adopted
National Planning Framework 4 and the South Lanarkshire Local Development Plan
2 and it is recommended that the Planning Committee grant the application. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant consent subject to the conditions listed below:- 
01. That all extraction operations on the site shall be discontinued no later than 2
June 2036 and that, within a period of 12 months from this discontinuance date,
the entire site shall be restored in accordance with the approved restoration
scheme (as required by condition 2) to the satisfaction of the Council as
Planning Authority.   
Reason: To ensure that the site is satisfactorily restored within an acceptable
timeframe. 
02. That no details of the restoration scheme are hereby approved. Within 12
months of the date of this permission, or unless otherwise agreed in writing by
the Planning Authority, a detailed restoration, habitat management and
aftercare scheme for the entire site shall be submitted for the written approval
of the Council as Planning Authority and the restoration, habitat management
and aftercare of the site shall be carried out to the satisfaction of the Council as
Planning Authority in accordance with the approved scheme and timescale.   
Reason: Further details are required on the restoration, habitat management
and aftercare proposals to ensure suitable restoration of the site. 
03. That if, due to unforeseen circumstances, it becomes necessary or expedient
following commencement of works to materially amend the provisions
contained within the approved documents or conditions, the developer shall
submit for the consideration of the Council as Planning Authority, an amended
application and statement of intent: the developer shall adhere to the approved
plans until such time as an amended application may be approved by the
Council as Planning Authority.   
Reason: In order that the terms of consent may be considered should a change
in operation become necessary. 
04. That the site shall at all times be worked in accordance with the operational
programme of works as set out in the Environmental Impact Assessment
Report dated March 2020 accompanying the application, unless otherwise
directed by these conditions or by the prior written approval of the Council as
Planning Authority.   
Reason: To ensure that the Planning Authority retains effective control of the
development. 
36

Page 37

05. That before this planning permission is implemented on site, compliance with
the Council's Sustainable Drainage Systems (SuDs) design criteria guidance
and inclusive sign off by the relevant parties carrying out the elements of work
associated with the design criteria appendices 1 to 5 shall be submitted for the
written approval of the Council, as Planning Authority and thereafter be carried
out as approved for the lifetime of the development, hereby approved.   
Reason: In the interests of flood risk and water management. 
06. Notwithstanding the details shown on the stamped approved plans, that before
this planning permission is implemented on site (including enabling works), the
following details shall be submitted to and approved in writing by the Council as
Planning Authority, and such details as may be approved, shall be implemented
to the satisfaction of the Council as Planning Authority prior to the
implementation of the permission hereby approved:- 
(a) detailed plans and elevations of all buildings, structures and fixed plant to
be erected on the site, including the colours and type of external materials to
be used; 
(b) details of the location, design and height of all new fences, walls and gates
to be erected within or around the boundaries of the site; 
(c) a noise monitoring programme (to include provisions relating to equipment
used, competence of monitoring personnel, frequency of measurement,
programme of implementation, action to be taken when non-compliance is
detected, parameters to be recorded, monitoring locations and submission of
results to the Council as Planning Authority); 
(d) a vibration monitoring programme (to include provisions relating to
equipment used, competence of monitoring personnel, frequency of
measurement, programme of implementation, action to be taken when non-
compliance is detected, parameters to be recorded, monitoring locations and
submission of results to the Council as Planning Authority); 
(e) a detailed planting and management plan for the existing Dod Wood and
screen bunding, detailing species to be planted, planting densities, tree
protection measures, grass seed mixes and long term management proposals
to ensure successful establishment. 
(f) a programme of archaeological works in accordance with a written scheme
of investigation detailing methods of recording and recovery of any
archaeological resources found. 
(g) details of the location, type and orientation of any external lighting to be
erected.   
Reason: In order to define the terms of the consent. 
07. That in the first available planting season following implementation of this
permission, the proposed area of coniferous planting to the south of the
compound area and the existing Dod Wood shall be planted, and thereafter
managed in accordance with the approved planting and management plan
submitted in terms of condition 6(e).   
Reason: To ensure that screen planting is carried out on site. 
08. That before implementation of this permission, details of all soil screening
mounds shall be submitted for the written approval of the Planning Authority.
Once approved the mounds shall be implemented as such and maintained for
the lifetime of the development, hereby approved. 
37

Page 38

Reason: In the interests of visual amenity. 
09. That in the first available planting season following the construction of the soil
screening mounds as required by condition 8 shall be planted and thereafter
managed in accordance with the approved planting and management plan
submitted in terms of condition 6(e).   
Reason: In the interests of visual amenity. 
10. The site shall not operate outwith the hours stated below without the prior
written approval of the Council as Planning Authority, and during these hours
the site shall be adequately manned and supervised.                          
Weekdays    Saturdays 
Time of Opening  7.00 am  7.00 am 
Time of Closing  7.00 pm  1.00 pm 
There shall be no working on Sundays or local bank holidays (with the
exception of essential maintenance work), unless otherwise agreed in writing
by the Council as Planning Authority.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
11. Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development)(Scotland) Order 1992 (or of any order revoking,
amending or re-enacting that Order), no buildings, structures or fixed plant,
including that required for lighting the site, other than those approved under 
conditions 6a and 6k, shall be erected or installed within the site, without the
prior written approval of the Council as Planning Authority.   
Reason: In the interests of maintaining planning control of the site 
12. The applicant or subsequent operator(s) shall at all times be responsible for the
removal of mud or other materials deposited on the public highway by vehicles
entering or leaving the site.   
Reason: In the interests of road safety. 
13. That all laden lorries leaving the site shall be sheeted before entering the public
highway.   
Reason: In the interests of road safety. 
14. That for the duration of operations, all road-going mineral carrying vehicles (or
other vehicles entering the processing area), shall pass through the operational
wheel washing facility prior to entering the public highway.   
Reason: In the interests of road safety. 
15. The section of the access road between the wheel washing equipment and the
B7078 shall be maintained in such condition as to prevent ruts, potholes and
ponding of water and shall be kept clear of mud and dirt at all times, to the
satisfaction of the Council as Planning Authority.  
38

Page 39

Reason: To minimise the chance of any debris from the site being carried onto
the public highway; in the interests of road safety. 
16. That with respect to the control of noise resulting from the operations at this site
the developer shall comply with the following:- 
(a) that during the operational hours, as defined by Condition 10, the nominal
noise limit from site operations at all noise sensitive properties, in the vicinity of
the site, shall not exceed 55 dB(A) LAeq, over any one hour period; 
(b) that during the non-operational hours the nominal noise limit from site
operations at all noise sensitive properties in the vicinity of the site shall not
exceed 42 dB(A) LAeq, over any one hour period; 
(c) that for soil stripping and construction of permanent landforms, during
operational hours and for no more than 8 weeks in any 12 month period, the
nominal noise limit from site operations at all noise sensitive properties in the
vicinity of the site shall not exceed 70 dB(A) LAeq, over any one hour period.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
17. That the operator shall at all times abide by the terms of all noise management
contained within the Environmental Impact Assessment Report dated March
2020, including Appendix 1. For the avoidance of doubt, all references within
this report to the noise management programme contained within section 10 of
the Planning and Environmental Statement dated February 2007 of Planning
Permission Ref: CL/07/0070 are considered to require compliance with this
document and form part of the noise management programme approved by this
condition.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
18. Efficient silencers shall be fitted to and used and maintained in accordance with
manufacturer's instructions on all vehicles, plant and machinery used on the
site.  With the exception of maintenance, no machinery shall be operated with
the covers open or removed.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
19. That reversing alarms used on plant and vehicles shall be either non-audible,
ambient related, or low tone devices.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
20. That the operator shall minimise dust emissions from the site by every
practicable means, and shall at all times operate the site in full accordance with
the dust monitoring and management plan contained within Environmental
Impact Assessment Report dated March 2020.  For the avoidance of doubt, all
references within this report to the dust monitoring and management
programme contained within section 11 of the Planning and Environmental
Statement dated February 2007 of Planning Permission Ref: CL/07/0070 are
considered to require compliance with this document and form part of the noise
management programme approved by this condition. 
39

Page 40

Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
21. That, in the event of dust nuisance problems being created by operations on
site, the operator shall take all reasonable remedial measures to minimise the
transmissions of dust, to the satisfaction of the Council as Planning Authority.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
22. That at all times during operations, water bowsers and sprayers, whether fixed
or mobile, shall be used to minimise the emission of dust from the site.  If the
prevention of dust nuisance by these means is not possible, then the movement
of soils, vehicles, etc. shall temporarily cease until such time as the weather
conditions improve.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
23. That the developer shall ensure that sufficient water is maintained at all times
on site, to address the requirements for dust suppression.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
24. That no blasting shall take place on site outwith the hours of 10.00 hours to
16.00 hours Monday to Friday.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
25. That from the date of this permission until the cessation of operations, each
blast shall be numbered consecutively. Ground vibration, as a result of blasting
operations, shall not exceed a peak particle velocity of 6mm per second in 95%
of each block of 20 consecutively numbered blasts, and no individual blast shall
exceed a peak particle velocity of 10mm per second, all as measured at any
vibration sensitive property.  The measurement to be the maximum of 3
mutually perpendicular directions taken at the ground surface of any vibration
sensitive property.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
26. That the developer shall at all times, adopt good blasting practice and so far as
is reasonably practical, shall not carry out blasting operations in adverse
weather conditions.   
Reason: To minimise any nuisance and to protect the amenity of neighbouring
properties. 
27. That any stripping, stacking and replacement of topsoil shall be carried out
when conditions are dry enough to avoid unnecessary compaction of the soils
at any stage.  The applicant shall give at least 7 days notice to the Council as
Planning Authority prior to the commencement of any period of soil movements
and the Council as Planning Authority reserves the right to suspend operations
40

Page 41

during adverse weather conditions or to impose such conditions as it sees fit
for the safekeeping of the topsoil.   
Reason: To preserve the quality of soils. 
28. That the movement of plant, vehicles and machinery on the site shall be carried
out in such a manner as to avoid, as far as possible, the crossing of undisturbed,
reclaimed or restored land.   
Reason: To avoid any unnecessary incursion onto parts of the site which are
undisturbed or have been restored; in the interests of the general amenity of
the site. 
29. No operations involving soil lifting/replacement shall take place between the
months of October to March inclusive except with the prior written approval of
the Council as Planning Authority.   
Reason: To preserve the quality of soils. 
30. That soils shall only be stripped when they are in a suitably dry and friable
condition (suitably dry means that the top soil can be separated from the sub
soil without difficulty so that it is not damaged by machinery passage over it).   
Reason: To preserve the quality of soils. 
31. That no soil shall be removed from the site.   
Reason: To ensure sufficient soils are retained on site for restoration purposes. 
32. That all soil storage mounds (temporary and permanent) shall be constructed
with only the minimum amount of compaction necessary to ensure stability and
shall not be traversed by heavy vehicles or machinery except during stacking
and removal for re-spreading during site restoration.  They shall be graded and
seeded with a suitable low maintenance grass seed mixture immediately
following their formation.  The sward shall be managed in accordance with the
appropriate agricultural management techniques throughout the period of
storage.   
Reason: To preserve the quality of soils, and in the interests of the visual
appearance of the site. 
33. That without the prior written approval of the Council as Planning Authority, no
trees within the application site shall be lopped, topped or felled, and the
operator shall protect the same from damage.   
Reason: To safeguard the ancient woodland to the site boundary. 
34. That where the outer operational boundary does not coincide with an existing
suitable stockproof fence the operator shall provide and erect a stockproof
fence, to the satisfaction of the Council as Planning Authority, prior to the
implementation of this permission. The fencing shall thereafter be maintained
in good condition until final restoration is completed.   
Reason: To ensure site safety and maintenance of boundary security.  
41

Page 42

35. All containers being used to store liquids (which have the potential to cause
pollution) within the application site shall be labelled clearly to show their
contents and located in a bund which shall be at least 110% of the capacity of
the largest container stored within it.   
Bunds shall conform to the following standards:- 
- The walls and base of the bund shall be impermeable  
- The base shall drain to a sump  
- All valves, taps, pipes and every part of each container shall be located within
the area served by the bund when not in use;  
- Vent pipes shall be directed down into the bund;  
- No part of the bund shall be within 10 metres of a watercourse;  
- Any accumulation of any matter within the bund shall be removed as
necessary to maintain its effectiveness.   
Reason: To ensure the safekeeping of such liquids. 
36. That unless otherwise approved in writing by the Council as Planning Authority,
at the completion of final restoration, all remaining access roads and
hardstandings are to be removed and the ground restored in accordance with
the approved scheme (submitted in terms of condition 2). 
Reason: To ensure suitable restoration of the site. 
37. That unless otherwise approved in writing by the Council as Planning Authority,
no material shall be imported to or deposited at the site.   
Reason: For the avoidance of any doubt over what is approved. 
38. That, in the event of extraction operations on any phase of the site ceasing for
a period of 12 months or more, the Council as Planning Authority shall deem
operations on site to have permanently ceased, and shall require immediate
implementation of the approved restoration scheme (submitted in terms of
condition 2), unless otherwise agreed in writing with the Council as Planning
Authority.   
Reason: To ensure that the Planning Authority retains effective control of the
development. 
39. That from the date of commencement of works on the site until completion of
the final restoration, a copy of this permission and all approved documents and
subsequently approved documents, shall be available for inspection in the site
offices during approved working hours.   
Reason: To ensure the site operator and visiting officials are aware of the
approved details. 
40. That within one year of the date of commencement of this permission (and on
that date each year thereafter), the operator shall submit to the Council as
Planning Authority, an annual progress plan detailing:- 
- The extent of extraction operations undertaken that year;  
- Areas prepared for extraction;  
- The extent of backfilling or restoration operations carried out;
42

Page 43

- The extent of landscaping, nature conservation and agricultural works that
have been implemented;  
- Recent site survey;  
- Current and anticipated production figures;  
- Remaining reserves;  
- Compliance with statutory permissions;  
- Site complaint logs and actions taken.   
Reason: To ensure that the Planning Authority is informed at regular intervals
of the progress of the site; to assist with site monitoring; and to help inform
development plan production. 
41. That before this planning permission is implemented on site, the ethylene
pipeline (North West Ethylene Pipeline) shall be relocated fully outwith the site
boundary. Details demonstrating the safe relocation of the pipeline, including
all required authorisations from the Health and Safety Executive shall be
submitted for the written confirmation of the Planning Authority. 
Reason: In the interests of public safety. 
42. That before this planning permission is implemented on site the operator shall
obtain, and provide to the Planning Authority, written confirmation from Scottish
Water and the National Grid that the predicted vibration levels at their
respective apparatus within the vicinity of the site are within parameters
acceptable to them. 
Reason: In the interests of public safety. 
43. That before this planning permission is implemented on site but following the
relocation of the pipeline required by condition 41, the operator shall obtain,
and provide to the Planning Authority, written confirmation from Shell UK that
the predicted vibration levels at their apparatus within the vicinity of the site are
within parameters acceptable to them. 
Reason: In the interests of public safety. 
12. Reason for Decision
12.1. The proposals to vary a condition to extend the period of quarrying at the site are
considered acceptable, subject to the imposition of the previous suite of conditions
and accord with policies 23 and 33 of the National Planning Framework 4, and with
policies 1, 2, 4, 5, 14, 15, 16, 19, MIN1, MIN2, MIN3, MIN5 and MIN6 of the adopted
South Lanarkshire Local Development Plan 2.   
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  17 June 2024 
Background Papers
Further information relating to the application can be found online:-
P/23/1293 | Extraction and processing of hard rock aggregates by quarrying methods (Section 42
application to vary condition 1 of planning permission P/20/0514, to permit an extended period for the
extraction of reserves from 2nd June 2029 to 2nd June 2036) | Duneaton Quarry B7078 From Millbank
To Abington Int Crawfordjohn Biggar (southlanarkshire.gov.uk)  
43

Page 44

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk
44

Page 45

45

Page 46

46

Page 47

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 25 June 2024 
Report by: Executive Director (Community and Enterprise
Resources) 
Reference no:  P/23/1289 
Proposal:  Formation of Football Pitch/Sports Facility and Installation of 6 x 15
Metre High Floodlights, Refurbishment and Extension of Larkfield
Hall, Formation of Additional Parking, Re-Alignment of Existing
Footpaths, Erection of Fencing Enclosing Pitch and Associated
Alterations 
Site Address:  Land adjacent to Stonefield Road and Larkfield Neighbourhood Hall,
Blantyre 
Applicant:  Blantyre Soccer Academy 
Agent:  Mark Dysart
Ward:  15 - Blantyre
Application Type:  Full planning permission
Advert Type:  Schedule 2 and Non-notification of Neighbours: Hamilton Advertiser 8
February 2024 
Development Plan
Compliance: 
Yes 
Departures:  N/A 
Recommendation:  Grant subject to conditions
Legal Agreement:  No 
Direction to
Scottish Ministers 
No 
7
47

Page 48

1. Reason for Report
1.1. This application is being presented to the Planning Committee for determination as it
has received more than 5 objections, as detailed in paragraph 3.5 (b) of the Decision
Making Process (April 2015). 
2. Site Description
2.1. The planning application site extends to approximately 1.5ha and currently contains
an ash football pitch with associated floodlighting columns and mesh fencing,
however, the floodlighting is no longer operational.  The site also accommodates the
Larkfield Neighbourhood Hall which has been closed for a number of years, an
associated car parking area, a footpath network, trees and areas of open space.   
2.2. The site is situated within an established residential area in Blantyre and is enclosed
to the south by Stonefield Road, a main route through Blantyre, and further by a mix
of residential and commercial properties.  The site is enclosed to the west by open
space and a restaurant / public house.       
2.3. There are level differences within the site as the ground falls from the existing pitch
towards Stonefield Road and Broompark Road. The pedestrian access to the site is
from an existing footpath network and the existing vehicular access to the site is from
Broompark Road. 
3. Description of Proposed Development
3.1. Planning permission is sought for the formation of a football pitch / sports facility, the
installation of six 15 metre high floodlights, the refurbishment and extension of
Larkfield Hall, the formation of additional parking, the re-alignment of existing
footpaths, the erection of fencing and associated alterations. 
3.2. The proposal seeks to replace the existing ash pitch, with a full size (100m x 60m) 3G
artificial playing surface pitch.  The pitch would be enclosed by 2m high spectator
fencing and 5m high wire mesh metal fencing.  In addition, a 1.8m high acoustic fence
would also be installed adjacent to the pitch. The proposal includes associated
floodlights to illuminate the pitch and the proposed operating hours of the floodlighting
system is 9am to 9pm daily.  The proposal includes external alterations to the existing
single storey Larkfield Hall and the erection of a single storey rear extension to
accommodate changing facilities and toilets.  In addition, the proposal includes an
extension to the existing parking area.  The car park currently accommodates 12 car
parking spaces and the proposal relates to an increase to 38 car parking spaces,
including 3 accessible spaces and 8 with associated electric vehicle charging points.     
3.3. The supporting information submitted by Blantyre Soccer Academy identifies that the
football pitch is proposed to be utilised by local schools during the day and at evenings
and weekends by Blantyre Soccer Academy for training and competitive football
games.  In addition, the refurbished Larkfield Neighbourhood Hall is proposed to be
utilised for a wide range of community uses including classes to support adults with
learning difficulties, mother and baby groups, men’s mental health groups and a drop-
in centre for pensioners. 
3.4. The original proposal also included a 5-a-side pitch situated to the rear of the
neighbouring restaurant, however, this was omitted during the planning application
process.   
4. Relevant Planning History
4.1 There is no relevant planning history relating to this site.    
48

Page 49

5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted the following:- 
 Design and Access Statement
 Noise Impact Assessment
 Lighting Impact Assessment
 Floodlighting Statement 
 letter detailing the proposed pitch and hall usage 
6. Consultations
6.1. Environmental Services – No objections to the proposal following the submission of a
noise and lighting impact assessment.  Conditions and advisory notes are
recommended in relation to the floodlighting scheme (including the operating hours),
site investigation works, construction noise and an acoustic barrier. 
Response: Noted. 
6.2. Scottish Water - No objection to the proposal.
Response: Noted. 
6.3. Roads Development Management Team - No objection to the proposed development,
subject to conditions relating to the parking provision within the site, surface water
drainage, the submission of a Construction Phase Traffic Management Plan and a
roads dilapidation survey.
Response: Noted. 
6.4. The Coal Authority – Whilst noting the presence of a historic mine shaft within the site,
the Coal Authority have no objection to the proposal subject to the attachment of an
informative. 
Response: Noted. 
7.   Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
199 representations have been received (26 objections and 173 supporting the
application). The issues raised are summarised as follows:- 
Design and Amenity 
 The proposal will result in noise issues and disturbance for the surrounding
properties
 Concern regarding the light levels from the proposed floodlighting and the
subsequent impact on the nearby residential properties
 The site is within a residential area and this development is out of character for
the area
 There are lots of dog walkers which use the area and the proposal will impact on
walking routes 
Roads Related Matters
 The development will result in a significant increase in traffic and subsequent
associated noise and pollution levels
 The proposal will encourage the use of the private car
 The proposed car parking for the development is insufficient
 The existing car parks in the area, including Carrigan’s, are already over capacity
and the proposal will exacerbate this issue
 There is not adequate provision at Stonefield Road, particularly in the evenings,
for pedestrians to safely cross the road to access the facilities 
49

Page 50

 The junction at Broompark Road and Stonefield Road is already one of the
busiest in Blantyre as there is significant traffic flow associated with the churches,
schools, shops and other existing uses in the area.  This proposal will contribute
to further congestion and road safety issues
 Concern regarding the potential for an increase in road traffic accidents 
Impact on the Natural Environment
 Concern that trees will be removed from the site
 The development will adversely impact on wildlife 
Other Matters Raised
 The site should be utilised for an alternative use such as allotments
 The development will reduce the value of nearby properties
 This will result in the loss of a public area
 The proposal will result in more litter
 There is a mine shaft within the site and this will pose a threat to surface stability
and public safety
 Stonefield Park has an area with football fields which is not being used to full
capacity and this could be upgraded and utilised
 Impact of the development on health 
Matters Raised in Support of the Application 
 The hall is currently an eyesore and its redevelopment is welcomed
 The hall will be utilised by local community groups rather than them having to
travel outwith the area
 Lots of local facilities are closed
 The site is derelict and it is about time that this land was developed for an
appropriate use
 The ash pitch and floodlighting has been at the site for many years
 This would be an excellent facility for the community of Blantyre especially
children
 This development should promote a healthier lifestyle and will have health
benefits for both children and adults
 The five local primary schools will be able to use this facility during the school
day
 This facility will support grass roots football and provide a safe environment for
members of the Blantyre Soccer Academy to play
 Such a development will contribute to improving children and young people’s
mental health and wellbeing
 The development should contribute to a reduction in anti-social behaviour in the
surrounding area
 The increase in footfall will support local businesses 
7.2. The above issues are considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  
50

Page 51

8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation
 Policy 3 - Biodiversity
 Policy 13 - Sustainable Transport 
 Policy 14 - Design, Quality and Place
 Policy 15 - Local Living and 20 Minute Neighbourhoods
 Policy 21 - Play, Recreation and Sport 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2). In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 5 - Development Management and Placemaking
 Policy 13 - Green Network and Greenspace
 Policy 15 - Travel and Transport
 Policy DM1 - New Development Design 
9.   Guidance
9.1. None. 
10.   Assessment and Discussion
10.1. Principle of Development 
Detailed planning permission is sought for the formation of a football pitch/sports
facility and the installation of six 15 metre high floodlights, the refurbishment and
extension of Larkfield Hall, the formation of additional parking, the re-alignment of
existing footpaths, the erection of fencing enclosing the pitch and associated
alterations at land adjacent to Stonefield Road and Larkfield Neighbourhood Hall,
Blantyre.  The determining issues in the consideration of this application are its
compliance with national policy, local development plan policy and its impact on
residential amenity, traffic safety, environmental matters and infrastructure issues. 
10.2. Policy 21 of NPF4 promotes and seeks to facilitate spaces and opportunities for play,
recreation and sport.  This policy aims to simultaneously improve the natural and built
environment and physical and mental health through the provision of, and access to,
outdoor recreation, play and sport facilities.  The lawful use of the majority of the site
is an ash football pitch and this policy supports the upgrading of existing facilities to
provide better quality sports provision.  Therefore, the re-development of the existing
outdated pitch to provide a modern, accessible, all-weather pitch and associated
facilities raises no issues within the context of Policy 21 of NPF4.    
51

Page 52

10.3. Policies 14 and 15 of NPF4 relate to 20 minute neighbourhoods and liveable places.
Policy 14 sets out that all development should be designed to improve the quality of
an area and be consistent with the six qualities of a successful place: healthy,
pleasant, connected, distinctive, sustainable and adaptable.  Policy 15 establishes that
development proposals should contribute to local living and 20 minute
neighbourhoods. 
10.4. In relation to the six qualities of a successful place, the proposal includes the
refurbishment of the existing community hall and the provision of a modern sports
facility.  Therefore, it is considered that this development will contribute to seeking to
improve both the mental and physical health of the local community.  In addition, the
investment and expansion of the existing facilities would contribute to creating a
pleasant and more distinctive place.  The proposed development site is located within
the Blantyre settlement boundary, which has a wide range of facilities and services
including a number of mixed uses such as education, commercial and residential
properties adjacent to the site.  The site is enclosed by Stonefield Road and
Broompark Road, which are two key routes through Blantyre, and therefore the site is
considered to be well connected and situated within a sustainable location which will
support local compact living and a 20 minute neighbourhood.  In addition, the site is
considered to be adaptable as the proposal seeks to ensure the long-term re-
occupation of a vacant building and a poor quality sports pitch whilst simultaneously
improving the vitality of the area.  It is considered that the proposal accords with the
provisions of Policies 14 and 15 of NPF4. 
10.5. Climate Change
Policy 1 of NPF4 requires that when considering all development proposals, significant
weight will be given to the global climate and nature crises.  Policy 2 of NPF4 seeks
to minimise and mitigate against the effects of climate change by considering various
criteria including being sustainably located, the reuse of vacant and derelict land, the
avoidance of flood risk areas, incorporating low and zero carbon generating
technologies, opportunities for active travel routes and trips by public transport and the
provision of electrical vehicle recharging infrastructure.  The proposal relates to the
redevelopment of brownfield land and the re-occupation of an existing property within
an established urban area, situated in close proximity to existing supporting facilities
and local services, established transport links and will include the provision of electrical
vehicle charging infrastructure at the site.  Therefore, it is considered that the proposal
raises no issues within the context of Policies 1 and 2 of NPF4. 
10.6. Policies 1 and 2 of the adopted Local Development Plan encourage sustainable
economic growth and regeneration, a move towards a low carbon economy, the
protection of the natural and historic environment and mitigation against the impacts
of climate change.  The proposal involves the regeneration of a site which is in a poor
state of repair within Blantyre and therefore raises no issues within the context of
Policies 1 and 2 of the adopted Local Development Plan.   
10.7. Natural Environment 
NPF4 Policy 3 details that all local developments shall include appropriate measures
to conserve, restore and enhance biodiversity.  In addition, the policy states that any
potential adverse impacts, including cumulative impacts, of development proposals on
biodiversity, nature networks and the natural environment should be minimised
through careful planning and design.  Whist the proposal relates to the removal of trees
to the northeast of the site to accommodate parking provision, the development has
been designed to ensure the retention of the majority of the trees within the site.  In
addition, the existing open space within the site and the surrounding area will not be
52

Page 53

adversely impacted upon by the development.  Therefore, it is considered that, on
balance, the proposal raises no issues in the context of Policy 3 of NPF4.   
10.8. The site is designated within the adopted Local Development Plan as part of the
established green network and priority greenspace.  Policy 13 establishes that  
proposals should safeguard the green network and that a partial loss of greenspace
may be considered favourably if a number of criteria are met.  In this instance, it is
considered that a significant proportion of the planning application proposal will be
within the footprint of the existing developed site and the remaining area will be
improved, including the formation of new footpath links throughout the site.  The
majority of areas of open space within the site and surrounding area will be unaffected
by the development, and this is an important component of the green network for
wildlife movement etc.  Therefore, it is not considered that the proposal will have a
significant adverse impact on the character or function of the green network,
greenspace area, landscape character and amenity of the site.  Therefore, the
proposal raises no issues within the policy context of Policy 13 of the adopted Local
Development Plan. 
10.9. Layout, Siting and Design
In terms of the detailed design of the development, Policies 5 and DM1 of the adopted
Local Development Plan generally require new development to have due regard to the
layout, form, design and local context of the area, and to promote quality and
sustainability in its design.  The ash sports pitch and lighting columns are established
at the site and the proposed 3G pitch is within the footprint of the existing pitch.  In
addition, the proposal seeks to refurbish and extend the existing community hall and
extend the established car parking area at the site.  Therefore, it is considered that the
proposed layout, form and scale of the artificial playing surface, lighting columns,
fencing and associated development is in keeping with the existing site.   
10.10. The removal of the 5-a-side football pitch during the application process has reduced
the proposed lighting levels, car parking requirements and general impact of the
development at the site.  In terms of amenity, it is considered that the existing site
levels, the installation of a 1.8m high acoustic barrier adjacent to the proposed pitch
and the restriction on the operating hours and the design of the floodlighting will
minimise the potential impact of the development on the residential properties in the
surrounding area.  The Noise Impact Assessment and Lighting Impact Assessment
have been reviewed and accepted by Environmental Services.  In addition, it is
considered that the design of the proposal will not result in a significant adverse impact
on any adjacent dwellings in terms of loss of light, overshadowing, overlooking or loss
of privacy.  Subsequently, it is considered that the development raises no issues within
the context of Policies 5 and DM1 of the adopted Local Development. 
10.11. Transport 
Policy 13 of NPF4 provides support for development proposals which have links to
local facilities, are accessible via public transport, provide low emission vehicle
charging points, provide cycle parking and take into account the transport needs of
diverse groups whilst simultaneously reducing the dominance of the car.  The location
of the site and the design of the proposal supports sustainable travel and generally
address these infrastructure requirements, in accordance with the provisions of Policy
13 of NPF4. 
10.12. Policy 15 of the adopted Local Development Plan seeks to ensure that development
considers, and where appropriate, mitigates the resulting impacts of traffic growth and
encourages sustainable transport options that take account of the need to provide
provision for walking, cycling and public transport.  In this regard, the site is situated
53

Page 54

adjacent to two main routes through Blantyre, is accessible by public transport and the
development would be well integrated into existing walking and cycling networks.  In
addition, Roads, Transportation and Fleet Services consider that the proposal is
acceptable in terms of access, parking and road safety issues.  Subsequently, it is
considered that the proposal accords with the provisions of Policy 15 of the adopted
Local Development Plan. 
10.13. With regards to the other matters raised in relation to an alternative site for the
proposed development or a different use for the subject site, it should be noted that
the Planning Service require to fully assess the application as submitted.  In addition,
concern regarding the loss of an existing view or a potential reduction in the value of
nearby properties are not material considerations in the determination of the current
planning application. 
10.14. Conclusion 
In conclusion, the proposal seeks to upgrade and regenerate an existing sports pitch
and vacant hall.  It is considered that the proposal will result in the creation of a high
quality facility which is anticipated to promote physical and mental health within the
local community. In addition, the design, layout and general impact of the development
is considered to be acceptable and the proposal raises no significant environmental
or infrastructure issues. Accordingly, the proposal complies with the relevant policies
contained in NPF4 and the adopted Local Development Plan.  It is therefore
recommended that the application be granted subject to the conditions listed. 
11.  Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.    
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That the approved floodlights shall only be used between the following hours:-  
 9am and 9pm 
The floodlights shall be turned off within 15 minutes of the end of the times
stated above.   
Reason: In the interests of amenity.  
03. That before the development hereby approved is brought into use the 1.8m high
acoustic barrier, which is detailed in the Addendum (dated 10 June 2024) to the
Noise Impact Assessment (dated 5 April 2024) prepared by New Acoustics,
shall be installed and remain in perpetuity to the satisfaction of the Council as
Planning Authority. 
Reason: In the interests of amenity.  
54

Page 55

04. That prior to the commencement of works on site, further information including
a site plan identifying the existing trees and those trees proposed to be removed
shall be submitted to and approved in writing by the Council as Planning
Authority. 
Reason: These details have not been submitted or approved. 
05. That all trees to be retained within the site shall be fully protected until the
completion of all site operations in accordance with methods, as set out in
BS5837/2012, to the satisfaction of the Council as Planning Authority.    
Reason: To ensure that adequate steps are taken to protect existing trees on
the site throughout the period of the proposed building operations. 
06. For the avoidance of doubt, no consent is granted for the external steel sheeting
as a facing material for the extension to the existing Larkfield Hall and further
details of the proposed external material shall be submitted to and approved in
writing by the Council as Planning Authority.  Thereafter, the development shall
be completed in accordance with the approved details.   
Reason: In order to retain effective planning control over the appearance of the
proposed extension. 
07. (a) That prior to the commencement of works on site, a comprehensive site
investigation, carried out to the appropriate Phase level, shall be submitted to
and approved in writing by the Council as Planning Authority. The investigation
shall be completed in accordance with advice given in the following:- 
- Planning Advice Note 33 (2000) and Part IIA of the Environmental Protection
Act 1990 (as inserted by section 57 of the Environment Act 1995).  
- Contaminated Land Report 11 - 'Model Procedures for the Management of
Land Contamination (CLR 11) - issued by DEFRA and the Environment
Agency.  
- BS 10175:2011 - British Standards institution 'The Investigation of Potentially
Contaminated Sites - Code of Practice.' 
(b) If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment. If a Phase 2 investigation is required, then a risk
assessment of all relevant pollution linkages using site specific assessment
criteria will require to be submitted. 
(c) If the risk assessment identifies any unacceptable risks, a detailed
remediation strategy will be submitted to and approved in writing by the Council
as Planning Authority. No works other than investigative works shall be carried
out on site prior to receipt of the Council's written approval of the remediation
plan. 
Reason: In order to ensure that the ground conditions are suitable for the 
proposed development.    
08. That prior to any works commencing on site, the applicant shall submit a
Construction Phase Traffic Management Plan (CPTMP) for the written approval
of the Council as Planning and Roads Authority. The plan shall include, but not
be limited to, the following:- 
55

Page 56

(i) Delivery route of all construction traffic from Stonefield Road.
(ii) A construction programme with HGV/LGV/Car movements by month and
type of work including removal of excess topsoil/subsoil.             
(iii) Details of all temporary construction direction signage.             
(iv) Provisions for emergency vehicle access.            
(v) Measures to prevent mud, detritus and surface water being deposited on
the public road.           
(vi) Details of on-site construction compound, laydown space, turning area and
on-site parking such that no construction vehicles or contractor vehicles shall
be permitted to park on the public road.            
(vii) Identification of a nominated person to whom any road safety issues can
be referred. 
Reason: In the interests of roads and pedestrian safety. 
09. That prior to the proposed football pitch being brought into use, all car parking
spaces and vehicular access shall be formed in accordance with drawing A1.1
Revision P4 with a bound surface and be set out and constructed in accordance
with the specification and to the satisfaction of the Council as Planning and
Roads Authority: 
(i) Right angled parking bays shall be 2.5 metres by 5.0 metres long with
additional activity space for disabled bays.             
(ii) Parallel parking bays shall be 2.5 metres by 6.0 metres long.
(iii) Electric vehicle charging bays shall be provided in accordance with the
Council’s Electric Vehicle Charging Points policy dated August 2022. 
Reason: To ensure adequate parking facilities are provided within the site. 
10. That prior to the occupation of the site, details for the treatment and disposal of
surface water run-off for the car park shall be submitted to and approved in
writing by the Council as Planning and Roads Authority.  The development shall
thereafter be constructed in accordance with the approved details. 
Reason: To ensure the appropriate disposal of surface water from the site. 
11. That prior to any works commencing on site, the applicant shall undertake a
roads dilapidation survey, in the presence of a representative of the Council as
Roads Authority, covering Stonefield Road and delivery route agreed through
the CPTMP.  Interim and final surveys shall be undertaken as directed by the
Council as Roads Authority.  Each inspection shall be recorded in a report to
include photographs, plans and a description of road condition, and be
submitted for record purposes within timescales agreed in writing with the
Council.  The applicant shall be responsible for repairing damage attributable
to their operations and undertake all necessary repairs within timescales
stipulated by the Council as Planning and Roads Authority.   
Reason: In the interests of road safety.. 
12. Reason for Decision
12.1. The proposal raises no significant adverse amenity, environmental or infrastructure
issues and complies with Policies 1, 2, 3, 13, 14, 15 and 21 of the National Planning
Framework 4 and raises no issues within the context of Policies 1, 2, 5, 13, 15 and
DM1 of the adopted South Lanarkshire Local Development Plan 2.  There are no other
material considerations which would justify the refusal of planning permission.
56

Page 57

David Booth
Executive Director (Community and Enterprise Resources) 
Date: 17 June 2024 
Background Papers
Further information relating to the application can be found online:-
P/23/1289 | Formation of football pitch/sports facility and installation of six 15 metre high floodlights,
refurbishment and extension of Larkfield Hall, formation of additional parking, re-alignment of existing
footpaths, erection of fencing enclosing pitch and associated alterations | Land Adjacent To Stonefield
Road And Larkfield Neighbourhood Hall Blantyre (southlanarkshire.gov.uk) 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
57

Page 58

58

Page 59

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0243
Proposal:  Change of Use of Retail Premises (Class 1A) to Gymnasium (Class
11)
Site Address:  Unit 3
Braidfute Retail Park
Old Market Road
Lanark
ML11 7LQ 
Applicant:  Pure Gym Limited 
Agent:  Urban Agile Limited
Ward:  06 - Lanark
Application Type:  Full Planning Permission
Advert Type:  Bad Neighbour – Lanark Gazette
Development Plan
Compliance: 
Yes 
Departures:  Not applicable 
Recommendation:  Grant subject to conditions 
Legal Agreement:  Not applicable
Direction to
Scottish Ministers 
Not applicable 
8
59

Page 60

1. Reason for Report
1.1. This application is required to be determined by Planning Committee under Class 16
of the South Lanarkshire Local Scheme of Delegation, namely due to the number of
objections received. 
2. Site Description
2.1. The site is located in the town centre of Lanark within an existing retail park, Braidfute
Retail Park. 
2.2. The retail park layout positions the majority of the retail units to the north and east
sides with delivery and servicing to the rear of these units. The southern edge of the
retail park has open space, a vacant listed building (former rotunda to the Auction
Market which the retail park replaced) and a row of smaller retail units, built later, at
the entrance. Residential developments are situated on the north and east sides. To
the south residential properties are situated on the opposite side of Hyndford Road.
To the west lies the entrance to the retail park off a roundabout, the servicing access
road leading to the rear. Beyond which lie further residential properties, a park and
ride car park and areas of open space. 
2.3. The unit this application relates to sits on the northern side of the retail park. It currently
operates as a retail business (Poundstretcher) and is situated between a supermarket
and clothes retailer. All units within the retail park are retail uses. However, there is
one currently vacant unit within the main retail park and four vacant smaller retail units
at the entrance which have remained vacant from the point of construction. 
2.4. The retail park is located in close proximity to the bus and train station of Lanark and
there are suitable pedestrian links into the retail park. There is also a large car park
within the retail park.   
3. Description of Proposed Development
3.1. The application seeks to use the current retail unit as a gymnasium, which is defined
in the Use Class Order as Class 11 – Assembly and Leisure Use.  The submitted
details proposed that the gym will operate 24 hours.  A separate application has been
made for air conditioning plant, which will be assessed separately under planning
application P/24/0383. 
3.2. During the handling of the application further amendments were requested to the
acoustic report requiring further testing and mitigation measures. 
4. Relevant Planning History
4.1. None relevant. 
5. Supporting Information
5.1. The following information has been submitted in support of the application:- 
 Acoustic Report - measures background noise, predicts impact on residential and
commercial units from plant noise, gym noise and vibration, sound breakout and
noise from weight drops and sets out mitigation measures 
6. Consultations
6.1. Environmental Services - No objection subject to conditions relating to provision and
specification of inhouse speaker system and acoustic limiter, noise levels for each
receptor, mitigation measures (covering insultation, lobbies and fire doors) and a
validation test prior to operations commencing.  
60

Page 61

7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
335 representations have been received (120 objections, 213 support, 2 comment). 
The issues raised are summarised as follows:- 
Support 
 Creates footfall for other uses in retail park
 Increase to any service with health and well-being benefits should be encouraged 
 Reduce vacancy within the retail park
 24 hour gym will provide for those who work shifts
 Sport and fitness facilities in Lanark and Biggar are lacking
 Ample parking 
 Presents a positive option for youths, who are presenting unsustainable anti-
social behaviour
 Many already travel outwith the town to go to the gym, this would reduce travel
 The unit is empty and will remain empty if this application isn’t approved 
Objections
 Other uses would be more beneficial at the retail park such as a restaurant or
soft play
 There is a need to retain retail units within the retail park
 There is an over provision of gyms already
 The development would create more traffic and congestion
 Noise impact from a 24-hour gym next to residential properties 
 Disturbance from nighttime activity in an otherwise daytime business area
 Use of the car park 24 hour will attract large car meets and associated noise 
The above issues are considered in the assessment below and full copies are
available to view on the planning portal.  A number of issues relating to the type of
gym proposed, i.e. a franchise and competition between existing gyms in Lanark were
raised, however, these are not material planning considerations. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland. It sets out spatial principles, regional priorities, national developments, and
national planning policy. NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 – Tackling the climate and nature crises
 Policy 2 – Climate mitigation and adaptation
 Policy 12 – Zero waste
 Policy 13 – Sustainable transport
 Policy 14 – Design, quality and place
 Policy 15 – Local living
 Policy 23 – Health and safety
 Policy 27 – City, town, local and commercial centres  
61

Page 62

8.3. South Lanarkshire Local Development Plan 2 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2). In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 – Climate Change
 Policy 5 – Development Management and Placemaking
 Policy 9 – Network of Centres and Retailing 
SLLDP2 Volume 2 Policies
 Policy DM1- New Development Design 
South Lanarkshire Council (SLC) Supporting Planning Guidance
None applicable. 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Principle of Development
It requires to be considered whether a gymnasium is a suitable use within Lanark retail
park which is also part of the designated town centre for Lanark. 
10.2. NPF4 Policy 27 and SLLDP2 Policy 9 both cover town centres, seeking to encourage
a mixture of uses compatible with their role as commercial and community focal points
and direct development to the most sustainable locations. Those locations tend to be
accessible by a range of sustainable transport modes and provide communities with
easy access to goods, services and the recreational opportunities they need. 
10.3. NPF4 Policy 15 Local Living seeks to ensure connected and compact neighbourhoods
where people can meet the majority of their daily needs (including sport and
recreation) within a reasonable distance of their home by walking, wheeling or cycling.
NPF4 Policy 13 Sustainable Transport seeks to encourage, promote and facilitate
development that prioritise walking, wheeling and cycling and public transport for
everyday travel and reduce the need to travel unsustainably. 
10.4. Lanark is considered a strategic town and sustainable urban location in the local
development plan. The site is located in the town centre in proximity to a bus station,
train station and pedestrian links.  A gymnasium is considered a sport and recreation
facility that is likely to be used on a regular basis by patrons. A gymnasium - a Class
11 Assembly and Leisure Use - is considered a suitable use in a town centre location
and a use which would add to the evening economy in a retail park, an identified action
for Lanark town centre in the SLLDP2. The proposal is considered acceptable in
principle. 
10.5. Climate Change
NFP4 Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2 aim to ensure that proposals for
new development must seek to minimise and mitigate against the effects of climate
change. The proposal has no external changes and relates to a change of use.
However, the use is sited in an accessible location with sustainable transport modes
utilising an existing building. Is considered to meet the overarching principles of NPF4
Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2.  
62

Page 63

10.6. Design, Quality and Place
The proposal involves only minor changes to the external appearance of the existing
building and the assessment is therefore primarily based on the change of use aspect
of the proposal. 
10.7. NPF4 Policy 14 Design, quality and place advises that proposals should be consistent
with the six qualities of a successful place. This includes ‘healthy’ quality, which
prioritises women’s safety and improving physical and mental health. This is an
existing retail park and the applicant has indicated that the proposed gym will operate
on a 24 hour basis. Whilst lighting is already available within the retail park, provision
could also be made for CCTV to ensure the safety of users using the gym. 
10.8. Since the construction of the retail park, planning policies have changed and now the
‘connected’ quality and various other policies seek to reduce car dependency. As
above the town centre location has bus and train links, however, the retail park has no
provision for cycle parking. As such, given the change of use and type of use, where
those are likely to utilise a bike to travel to the gym, it is considered proportionate to
request (via condition) the installation of cycle stands.  
10.9. Overall, it is considered that the proposal meets the terms of NPF4 Policy 14. 
10.10. Noise and Disturbance Impact
Whilst the use is suitable in principle in this location, there are neighbouring residential
properties which are required to be taken into consideration. A gymnasium use can
result in noise impact issues resulting from the music and activities undertaken during
classes and the operation of gym equipment and weights. 
10.11. NPF4 Policy 23 Health and Safety advises that proposals that give rise to
unacceptable noise issues will not be supported and also advises any proposals which
shall have positive effects on health, including providing opportunities for exercise, will
be supported. SLLDP2 Policy 5 Development Management and Placemaking and
SLLDP2 Policy DM1 seeks to ensure there is no conflict with adjacent land uses in
terms of noise. 
10.12. The submitted acoustic report has set out background noise measures, predicted
impact on residential and adjacent commercial properties. The mitigation measures
are detailed in the report and include – internal insulation to walls and ceiling,
improvements to the fire door arrangements and acoustic limiter to the in-house sound
system. Environmental Services have offered no objections subject to conditions
covering noise levels, noise management plan, mitigation measures and a validation
check. 
10.13. A representation has raised the issue of the opening of the car park 24 hours
potentially attracting car meets. The use of the car park and any potential anti-social
behaviour is a matter for the landlord and Police. 
10.14. On this basis, it is considered that the noise impact can be managed and mitigated
against and that the gym will have positive effects on health.  It is considered that the
proposal meets the terms of NPF4 Policy 23. 
10.15. Other issues
Various representations have raised the issue of loss of competition, concern in
relation to the franchise and impact on gyms ran by local business. Whilst empathetic
to the concerns of other gym owners and users in the town, private interests such as
63

Page 64

competition between businesses are not a material planning consideration and cannot
be taken into account in the decision making. 
10.16. Various representations have indicated they consider that there are a sufficient
number of gyms in Lanark. Others have pointed out the particular provision proposed,
including 24 hour provision, is attractive to them and they already travel outwith the
town to access this type of gym. 
10.17. The purpose of planning is to consider the long-term interest and therefore does take
into account if there is over-provision of a particular use which is damaging. NPF4
Policy 27 advises that development proposals for non-retail uses in city, town, local
and commercial centres will not be supported if further provision of these services
would undermine the character and amenity of the area and/or the health and
wellbeing of communities. These uses are deemed to include hot food takeaways,
betting offices, and high interest money lenders. It is not considered further provision
of a gym in Lanark would seek to undermine the health and wellbeing of the
community. Policy 23 Health and Safety actively encourages support to any use that
promotes exercise. 
10.18. Therefore, there is no basis within the development plan on which to refuse the further
provision of a gym in Lanark. 
10.19. Conclusion 
In conclusion, the use of the existing retail unit for a gymnasium situated within Lanark
town centre in an existing retail park is considered acceptable. The noise concerns
can be mitigated against and there no other material considerations which would
warrant refusal. It is considered the proposal meets the terms of the development plan,
NPF4 and SLLDP2. Overall, it is recommended that planning permission be granted,
subject to conditions. 
11.   Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.   
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That prior to the use, hereby approved, coming into operation, details of cycle
parking to be positioned to the front of the building, including number of stands
and design shall be submitted to the Council as Planning Authority for written
approval. Thereafter, the cycle parking shall be installed prior to the use being
implemented. 
Reason: To ensure the provision of cycle parking and in interests of sustainable
transport. 
03. A dedicated in-house sound system shall be used exclusively for the amplification
of music and speech which is produced in association with activities undertaken
within the gym and studio at all times. 
64

Page 65

The mounting of loudspeakers for the sound system shall be carried out by a
suitably qualified acoustician to ensure that they are well isolated from the
building structure, typically through the use of independent stands or resilient
fixings to achieve an isolation of at least 90%. 
Reason: To minimise noise disturbance to adjacent occupants. 
04. That prior to the use, hereby approved coming into operation, an Electronic
Sound Level Attenuation System otherwise known as an acoustic limiter, shall
be fitted to the in-house sound system required by Condition 3, before the
amplifier in the signal chain with the thresholds of the limiter set on both the Left
and Right stereo channels and the specification of the acoustic limiter shall be
submitted to and approved in writing by the Council as Planning Authority. The
aforementioned agreed specification shall then be set by the appointed person
who shall be suitably qualified (i.e. an acoustic/sound engineer and secured so
that it cannot be overridden by persons other than the appointed person). The
agreed electronic sound level attenuation system and specification shall be
retained thereafter and any alteration to the electronic sound level attenuation
system shall be agreed in writing with the Council as Planning Authority. 
Reason: To minimise noise disturbance to adjacent occupants. 
05. That prior to the use, hereby approved, coming into operation a Noise
Management Plan (NMP) shall be submitted to and approved in writing by the
Council as Planning Authority. The minimum details of the NMP shall cover
matters as set out in the Environmental Health Officer Consultation Response
dated 21.05.2024. The NMP shall thereafter be adhered to at all times. Any
amendment to the NMP shall be agreed in writing with the Council as Planning
Authority. 
Reason: To minimise noise disturbance to adjacent occupants. 
06. That prior to the use, hereby approved, coming into operation the mitigation
schemes as detailed in the Acoustic Report shall be completed. Any change to
the mitigation scheme shall be agreed in writing with the Council as Planning
Authority. 
Reason: To minimise noise disturbance to adjacent occupants. 
07. That during the operation of the use, hereby approved, the noise emissions
from the gym, music and associated sources shall not be audible within any
external amenity space at any noise sensitive property at any time. The
following shall be used as an objective guide for the aforementioned
requirement:- 
 (1) The LA10 entertainment noise shall not exceed the representative
background noise levels LA90 (without entertainment noise) in any 1/3
octave band between 40Hz and 160Hz
 (2) The LAeq,15min of the entertainment noise shall not exceed the
representative background noise LA90,15min (without entertainment
noise).
 (3) In terms of Leq / Lmax,F should be demonstrated not to exceed the
NR 15 curve respectively 
Reason: To minimise noise disturbance to adjacent residential properties.
65

Page 66

08. That during the operation of the use, hereby approved, Maximum noise levels
generated by the proposed new development in terms of Leq / Lmax,F shall not 
exceed the NR 35 curve respectively inside adjacent commercial premises. 
Reason: To minimise noise disturbance to adjacent commercial properties. 
09. That within an agreed timescale not exceeding six weeks of the use hereby
approved becoming operational, the applicant shall undertake a validation noise
impact assessment examining the design, use and effectiveness of the proposed
mitigation installed. This shall demonstrate compliance with the permitted noise
levels as identified. The validation noise impact assessment shall be submitted
to and approved in writing by the Planning Authority. Where levels are not
achieved, further mitigation in the form of additional acoustic treatment or
management of the noise sources shall be introduced. 
Reason: To minimise noise disturbance to adjacent occupants. 
10. That following any reasonable complaint relating to noise emissions arising from
the operation of the Gym, the operator shall appoint an independent noise
consultant, whose appointment shall require to be approved in writing by the
Planning Authority, to measure the level of noise emission from the gym at the
residential or commercial property to which the complaint is related in keeping
with the required conditions and relevant standards. 
Reasonableness would be contingent on the complaint having been initially
brought to the attention of the unit operator, in line with the details in the noise
management plan, to be investigated and as necessary resolved. 
Reason: To minimise noise disturbance to adjacent occupants. 
12. Reason for Decision
12.1. The application seeks detailed planning permission for the use of Unit 3 as a
gymnasium, Class 11 - Assembly and Leisure, for 24 hour use. The site by its
sustainable location in Lanark town centre and retail park location is suitable for this
use. Noise impacts can be mitigated against and further improvements such as cycle
stands have been requested via condition. The proposal complies with Policies 1, 2,
3, 14, 15, 23, 27 of National Planning Framework 4 (adopted 2023) and Policies 2, 5,
DM1 of South Lanarkshire Local Development Plan 2 (adopted 2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 17 June 2024 
Background Papers
Further information relating to the application can be found online:- 
P/24/0243 | Change of use of retail premises (Class 1A) to gymnasium (Class 11). | Unit 3 Braidfute
Retail Park Old Market Road Lanark ML11 7LQ (southlanarkshire.gov.uk) 
66

Page 67

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
67

Page 68

68

Page 69

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0278
Proposal:  External Alterations Associated with the Change of Use of a Betting
Office to a Restaurant Including the Formation of a Flue 
Site Address:  4A Cullen Road
East Kilbride
G75 0ET 
Applicant:  Murray Burgers
Agent:  David Jarvie
Ward:  07 East Kilbride Central South
Application Type:  Full Planning Permission
Advert Type:  Schedule 2 and Non-Notification of Neighbours: East Kilbride News
20 March 2024 
Development Plan
Compliance: 
Yes 
Departures:  N/A
Recommendation:  Grant subject to conditions
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
9
69

Page 70

1. Reason for Report
1.1. This application must be presented to the Planning Committee for determination as it
has received more than 5 objections, as detailed in paragraph 3.5 (b) of the approved
South Lanarkshire Council Planning Application Decision Making Process April 2015. 
2. Site Description
2.1. The application site is an existing single storey detached building, located on the
corner of Cullen Road and Cullen Lane, north-west of The Murray Square, East
Kilbride. It consists of a vacant former betting office unit and a small area of
surrounding land, including a small front car parking area and both steps and a ramp
to provide access to the unit. The immediate surrounding land uses include the
adjacent public house and Cullen Lane, which provides access to lock ups and is the
main service access for the commercial units within The Murray Square. There are
also residential units within The Murray Square and dwellings to the north of the site,
along Cullen Road. 
3. Description of Proposed Development
3.1. Planning permission is sought for external alterations to the unit associated with the
change of use of the betting office to a restaurant. These are primarily related to the
installation of a ventilation system for the kitchen, including the formation of a flue, with
no other significant external changes proposed. Internally, the space is proposed to
be reconfigured to form a kitchen area, ancillary storage, and staff spaces as well as
a servery/bar and customer seating area. 
3.2. It should be noted that the change of use of the unit from a betting office to a restaurant
(Class 3) falls within permitted development rights under Class 11A of the Town and
Country Planning (General Permitted Development) (Scotland) Order 1992, as
amended.  It therefore does not require the submission of a planning application, and
this application is only for the external alterations to the building.   
4. Relevant Planning History
4.1. Planning consent was refused for the erection of a single storey extension to the
building in both 1999 (EK/98/0112) and 2001 (EK/01/0019). Consent was granted for
the installation of air conditioning units in 2002 (EK/02/0108) and for the display of new
signage the same year (EK/02/0065). These applications were related to the buildings
former use as a betting office. 
5. Supporting Information 
The following information was submitted by the applicant in support of the application: 
5.1. Covering Letter – This confirmed that the only external changes would be the
ventilation system. It also advised that the restaurant is proposed to open between
9am and 11pm Sunday to Thursday, and 9am to 12 Midnight on Friday and Saturday. 
It aims to cater for breakfast trade through to evening meals, with an element of
takeaway.  Six full time members of staff and six part time members of staff would be
required. 
5.2. Ventilation System Details – This document provides further details on the proposed
ventilation system operation. It was revised and updated with additional information
while the application was under consideration. 
6. Consultations
6.1. Environmental Services – Recommended that a decision on the application is
deferred pending the submission of further information on the ventilation system and
have also requested the inclusion of relevant advisory notes on the decision notice.
70

Page 71

Response – Noted. Additional information has been provided by the applicant and it
is considered that the remaining technical details can be controlled by a suitably
worded condition on the decision notice. The advisory notes can also be added as
appropriate. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of 6
representations have been received (6 objections). The issues raised are summarised
as follows:- 
 Concerns regarding drainage and the potential for fat discharge into the sewage
system
 Concerns regarding the lack of car parking in the area and the impact on traffic
 Concerns regarding the poor state of the existing car parking area and grounds
maintenance
 Concerns regarding the potential for noise and disturbance, and for groups of
people to congregate in the area
 Concerns regarding odour and the effectiveness of the ventilation system
 Concerns regarding the potential for wildlife and vermin to feed on discarded food
 Concerns regarding increased competition and the impact of the development on
the viability of other units within The Murray Square 
The above issues are considered in the assessment below. These letters are available
for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
National Planning Framework 4
8.2. National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy. It sets
out spatial principles, regional priorities, national developments, and national planning
policy. NPF4 supports the planning and delivery of sustainable places, liveable places,
and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation
 Policy 14 - Design, quality and place
 Policy 27 - City, town, local and commercial centres 
South Lanarkshire Local Development Plan 2 (2021)
8.3. For the purposes of determining planning applications the Council will also assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan (SLLDP2). In this regard the application site and associated
proposals are affected by the following policies:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change
 Policy 5 - Development Management and Placemaking
 Policy 9 - Network of Centres and Retailing  
71

Page 72

SLLDP2 Volume 2 Policies
 Policy DM1 - New Development Design
 Policy DM9 - Hot Food Shops 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Full planning permission is sought for external alterations associated with the change
of use of a betting office to a restaurant, including the formation of a flue, at 4A Cullen
Road, East Kilbride. The main issues to be addressed in the determination of this
application includes the acceptability in principle of the proposed development, its
design, siting and impact upon amenity, and an assessment of technical matters.  The
policies contained within National Planning Framework 4 and the South Lanarkshire
Local Development Plan 2 are the main consideration in this case, together with an
assessment of any other material planning considerations. 
Principle of Development
10.2. The application site is located within a designated local centre serving The Murray,
where NPF4 Policy 27 – City, town, local and commercial centres is applicable. This
policy supports proposals that enhance and improve the vitality and viability of city,
town and local centres, including proposals that increase the mix of uses. 
Development proposals will be consistent with the town centre first approach, and
proposals for non-retail uses will not be supported if further provision of these services
will undermine the character and amenity of the area or the health and wellbeing of
communities, particularly in disadvantaged areas.     
10.3. SLLDP2 Policy 9 – Network of Centres and Retailing seeks to support a network of
centres to provide retail and other local services to communities.  Within local centres,
proposals for change of use will be assessed with regard to the provision for an
appropriate mix of uses that meet economic and social need.  A retail element should
be retained to serve the needs to the local community.     
10.4. SLLDP2 Policy DM9 - Hot Food Shops sets out the policy for such establishments in
various settings. Within retail/commercial areas, an adequate level of shopping
provision must be maintained, and the viability of the centre and its retail function must
not be adversely affected. There should also be a satisfactory balance between
retailing and non-retailing uses, and the proposal must not have a significant impact
in terms of environmental, traffic, public safety, or amenity considerations. The
applicant must also be able to demonstrate that a suitable ventilation system can be
provided. 
10.5. With regards to the principle of the development, this application can only consider the
external alterations to the building.  The applicant has stated that the proposed use of
the property is as a restaurant with ancillary takeaway only. The principle of the change
of use from a vacant betting shop to a restaurant is therefore covered under permitted
development legislation and is not the subject of this application.   
10.6. The proposal has been considered against SLLDP2 Policy DM9 as it is considered
that the setting and scale of the unit may lead to more takeaway customers than would
be expected of a typical restaurant. There are several takeaways operating within The
Murray Square, however, suitable retail provision remains. The unit has been vacant
for some time, and this proposal will bring the unit back into productive use and provide
further choice within the local centre. On the specific subject of this application, the
implementation of external alterations to install a suitable ventilation system at this unit
72

Page 73

is acceptable in principle, and the proposal is not considered to conflict with NPF4
Policy 27 or with SLLDP2 Policies 9 and DM9. 
Climate Change
10.7. NFP4 Policy 1 - Tackling the Climate and Nature Crises and NPF4 Policy 2 - Climate
Mitigation, along with Policy 2 of SLLDP2, aim to ensure that proposals for new
development must, where possible, seek to minimise and mitigate against the effects
of climate change. In this instance, the proposal is for relatively minor alterations to an
existing vacant building to bring it back into productive use and there would not be any
significant impact upon the local environment or climate associated with these works. 
The proposal therefore does not conflict with NPF4 Policies 1 and 2, and with SLLDP2
Policy 2. 
Layout, Siting and Design
10.8. NPF4 Policy 14 - Design, quality and place aims to encourage, promote, and facilitate
well designed development that makes successful places by taking a design-led
approach and applying the Place Principle. It sets out six qualities of successful
places, including whether the development is connected and sustainable. 
10.9. SLLDP2 Policy 5 – Development Management and Placemaking advises that to
ensure development takes account of the principles of sustainable development, all
proposals require to be well designed and integrated with the local area. Proposals
should have no significant adverse impacts on the local community and the
environment. Where appropriate, proposals should include measures to enhance the
environment. Policy DM1 – New Development Design of SLLDP2 also requires
development to promote quality and sustainability in design and layout. 
10.10. The proposal is limited to minor external alterations associated with the installation of
the ventilation system.  The most significant change would be the installation of a flue
on the roof of the structure. Such alterations are relatively common in urban
commercial spaces, including within this local centre, and the alterations would not be
visually prominent given the size of the flue, the scale of the building and its setting. 
No other significant external alterations are proposed, with the remainder of the work
relating to internal changes only which are outwith the scope of this application.
Replacement signage is likely to be required, which may be subject to separate
advertisement consent as appropriate, and it is hoped that bringing this unit back into
use would encourage other maintenance of the unit to be undertaken with regards to
car park repairs and landscape maintenance.   
10.11. There are residential properties close to the application site and a suitable ventilation
system can be provided for the property which will avoid odours or noise significantly
impacting upon local residents. Further details on this matter are noted below, under
technical matters. Overall, the proposal is considered to comply with NPF4 Policy 14
and with SLLDP2 Policies 5 and DM1. 
Other issues
10.12. Commercial competition is not a material planning consideration for applications of
this scale, and it is not a matter which can be considered in the assessment of this
proposal.  The change of use of the unit is permitted development and it is not the
subject of this planning application.   
10.13. As the change of use of this unit is not the subject of this application, matters related
to litter, concerns over discarded food, drainage, the function of the sewerage system,
and the potential for anti-social behaviour are noted but these concerns are not directly
relevant to the proposed external alterations which are the subject of this proposal. 
73

Page 74

The impact upon parking and traffic is similarly noted, but not directly relevant to this
proposal for external alterations.   
Technical Matters
10.14. Details of the ventilation system have been provided, and consultations have been
undertaken with colleagues in Environmental Services to ensure that the system is
suitable for its use in terms of controlling odours and preventing noise disturbance
from the ventilation system. The final technical details of this system have not yet been
agreed, but the operation of a sufficient ventilation system at this property, and the
operation of the restaurant generally, would not be considered to significantly impact
upon the amenity of local residents or the local centre. Conditions for a suitable
ventilation system can be included on the decision notice as appropriate. 
Conclusion 
10.15. In conclusion, following a detailed assessment of this proposal, it is considered that
the proposed external alterations and installation of a ventilation system would not
significantly impact upon the residential or visual amenity of the local area, or upon the
function of the local centre. The proposal will help to bring the vacant unit back into
productive use and provide additional choice for local residents. The proposal
complies with the relevant policies of the development plan and there are no material
considerations which would justify the refusal of consent. It is recommended that
consent is granted subject to an appropriate condition regarding the installation and
ongoing maintenance of a suitable ventilation system. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to the following conditions:- 
01. That prior to the commencement of any works on site, full technical details
relating to the method of ventilation, including its control of odours, fumes and
vapours generated on the premises, and its noise level, shall be submitted to
and agreed in writing by the Council as Planning Authority.   
Reason: In the interests of residential amenity. 
02. That prior to the development becoming operational, the ventilation system as
approved in writing by Condition 1 of this consent, shall be installed
appropriately.   
Reason: In the interests of residential amenity. 
12. Reason for Decision
12.1. The proposal would have no significant adverse impact on amenity, public safety, the
local environment or upon the function of the local centre, and complies with the
provisions of Policies 1, 2, 14 and 27 of National Planning Framework 4 (2023), and
Policies 2, 5, 9, DM1 and DM9 of the adopted South Lanarkshire Local Development
Plan 2 (2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 17 June 2024 
74

Page 75

Background Papers
Further information relating to the application can be found online:-
https://publicaccess.southlanarkshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=S9XJ2ZOPMNT00 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
75

Page 76

76

Page 77

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0297
Proposal:  Change of Use of Farm Steading to Form 2 Dwellings, Restoration of
Farmhouse to Form 1 Dwelling, Erection of 3 Dwelling Houses and
Associated Access Improvements - Further Application Under
Regulation 11 to Amend Layout and Design of one of the
Dwellinghouses Approved Under Application P/22/0345 
Site Address:  Orchard Farm
Waygateshaw Road
Carluke
ML8 5PX 
Applicant:  Mr M Porcelli
Agent:  Nicholas Lindsay Architects
Ward:  01 Clydesdale West
Application Type:  Full Planning Permission
Advert Type:  Non notification of neighbours and development affecting the setting
of Listed Building: Lanark Gazette 10 April 2024 
Development Plan
Compliance: 
Yes 
Departures:  N/A
Recommendation:  Grant subject to conditions
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
10
77

Page 78

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee within the
context of the approved Planning Application Decision Making Process (2015) as more
than 5 representations have been submitted in relation to the proposals. 
2. Site Description
2.1. The application site is situated between Crossford and Braidwood on a small plateau
above the River Clyde. It is enclosed by mature woodland and sloping ground to the
south and east, whilst to the west, the land falls to the River Clyde floodplain. To the
south-west of the farm steading lie the Listed Buildings of the Italian Garden and
Orchard House Nursing Home. These properties are screened from the steading
buildings by the nature of the local topography and mature woodland.   
2.2. To the west and south of the steading group, the fields were planted with orchard trees
and the presence of a number of ancillary potting or storage sheds are evidence that
the orchards were at one time run commercially. Access to the steading is taken from
the unclassified Waygateshaw Road via an unsurfaced access track which continues
down the north side of the steading to the orchards to the south and west of the
farmhouse. A private driveway to Orchard House adjoins the site to the south. 
3. Description of Proposed Development
3.1. Planning Permission (P/22/0345 – approved at Planning Committee, September
2023) authorised a change of use of farm steading to form two dwellings, restoration
of farmhouse to form one dwelling, erection of three dwelling houses and associated
access improvements. The purpose of this application is to seek permission to change
the design of the detached house at plot 2 and relocate it further northward of its
current approved position. 
3.2. The originally approved house was to be a 2 storey, 5 bedroom house with detached
garage. It had a linear design, finished with stone walls, slate and weather boarding
and was located in the south western corner of the site. The proposed house
comprises a single storey pitched roof block linked by a flat roofed corridor to the main
one and half storey section with single storey garage. It is linear in form and would be
finished in metal and timber boarding – it is smaller in mass, height, and floor area
than the previously approved house. The position of the house would be relocated
further to the northeast, closer to the farm steading, in a level area of the site and
would be orientated at an angle to face southwest (the original house had a west facing
aspect). The access from the public road would remain unchanged. 
3.3. Hedgerow and native tree planting is proposed along the northern and western
boundaries of the plot. An air heat source pump and sustainable drainage would be
installed. All foul drainage would be linked to a private treatment plant with clear water
outflow to a soakaway. 
4. Relevant Planning History
4.1. Planning permission (CL/12/00180) was granted on 1 April 2015 for the restoration
and conversion of the farmhouse and steading and for the three new dwellings as
enabling development and renewed by Planning Permission Ref. P/18/0374 on 1 April
2019. 
4.2. A report recommending the removal of the need for a Section 75 planning obligation
and amendment to planning conditions which were proposed to be attached to the
planning permission CL/12/0180 was approved by the Planning Committee in January
2015.  
78

Page 79

4.3. Listed Building Consent CL/12/0292 for the restoration and alteration of the B-Listed
farmhouse and steading was granted in August 2013 and after it expired another
Listed Building Consent P/22/0420, for the same proposal was granted in October
2022. 
4.4. Planning Permission P/22/0345 (renewal of planning application P/18/0374) was
granted by the Planning Committee on 5 September 2023. 
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
 Design Statement 
6. Consultations
6.1. None. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement in the local
press, a total of 8 objections have been received.  The issues raised are summarised
as follows:-   
Objections:- 
Amenity
 Increase in light, noise, and other general pollution
 The proposal conflicts with the rural character of the area
 The houses are more suited to an urban area 
Land Use Concerns 
 Not a sustainable location for 6 dwellings
 Cumulative impacts on nearby consents
 The application does not address the sustainable management of the site 
Impact on Natural and Historic Environment
 To be effective the farmstead and farm buildings must be restored first. The
Listed Buildings have further deteriorated over time
 The area is of internationally recognised historical significance in that it remains
one of the few areas in which one can witness the former importance of fruit
growing in the Clyde Valley and its preservation is an important responsibility for
the Council 
Roads Related Matters
 Narrow lane and unsuitable for increase in traffic
 The public footpath is not shown on the application
 Waygateshaw Road is already suffering from an increase in traffic and is not
suitable for further increase
 Approach roads are single track, frequently used by agricultural vehicles and
horses and are not suitable for the already increased traffic
 There has never been access to the development site from the lane running
between Waygateshaw Road and Orchard House  
79

Page 80

Other Matters Raised
 Pressure on existing utilities
 It is doubtful that the burn that takes the outflow from septic tanks can further
support outflows
 The infrastructure for roads, water supply and electricity are already extended
beyond its capacity and will further undermine its effectiveness for all residents
 The application has a lack of detail and does not clarify or identify what is
intended in either the short or long term 
7.2. Other non-material planning comments were included in representations.  These
points relate to:- 
 The completed housing development at Gillfoot nursery does not fit into the
landscape character
 The access at the road end of the lane is owned by Orchard Lodge, owned by an
objector who does not intend to grant access 
7.3. The above issues are considered in the assessment below. These letters have been
copied and are available on the planning portal.  
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. The development plan comprises the
South Lanarkshire Local Development Plan 2 (SLLDP2) and National Planning
Framework 4.   
National Planning Framework 4
8.2. National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland. It sets out spatial principles, regional priorities, national developments, and
national planning policy. NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 policies:-
 NPF4: Policy 1 Tackling the climate and nature crises
 NPF4: Policy 2 Climate mitigation and adaptation
 NPF4: Policy 3 Biodiversity
 NPF4: Policy 4 Natural places
 NPF4: Policy 7 Historic assets and places
 NPF4: Policy 8 Green belts
 NPF4: Policy 14 Design, quality and place
 NPF4: Policy 15 Local Living and 20 minute neighbourhoods 
South Lanarkshire Local Development Plan 2 (2021)
8.3. For the purposes of determining planning applications the Council will, therefore, also
assess proposals against the policies contained within the adopted SLLDP2.  In this
regard the application site and associated proposals are affected by the following
policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2: Climate change
 Policy 4: Green Belt and Rural Area
 Policy 5: Development Management and Placemaking
 Policy 14: Natural and Historic Development 
80

Page 81

SLLDP2 Volume 2 Policies
 Policy GBRA1: Rural Design and Development
 Policy GBRA4: Conversion and Re-use of Existing Buildings
 Policy DM8: Enabling Development
 Policy NHE3: Listed Buildings
 Policy NHE16: Landscape   
9. Guidance
9.1. None 
10. Assessment and Discussion
10.1. Principle of Development
NPF4 Policy 8 – Green Belts states that development proposals will only be supported
within green belts in certain circumstances which includes the re-use and rehabilitation
of historic environment assets.  Any development in the green belt must also
demonstrate that the location is essential, does not undermine the purpose of the
greenbelt, is compatible with the surrounding area, is of an appropriate design and
would not have a detrimental impact on the environmental quality of the area. 
10.2. The proposal involves the re-use and rehabilitation of an important B-Listed building
and although there is no specific reference to necessary enabling development in
Policy 8, this is referred to and justified under the terms of Policy 7 Historic assets and
places, which the proposal is considered to comply with. The character of the
established countryside and landscape would not be adversely affected, the new build
element has been appropriately designed and sited, the restoration works, and
planting scheme would enhance environmental quality and the purpose of the green
belt would not be undermined. 
10.3. In this instance the long-term future of an important historic asset within the green belt
cannot be secured without enabling development in the same location to contribute to
the significant costs of the listed building refurbishment. The retention of this heritage
asset, and the means to bring that retention about, are therefore considered to
enhance the landscape character and long-term environmental quality of the green
belt at this location. Policy compliance had already been established by the previous
Planning Permission P/22/0345 for the whole development. The current application
relates to a design change to and relocation of the approved dwelling at plot 2 and
would not undermine in anyway policy objectives or contradict the previous planning
approval.
10.4. In terms of Local Development Plan policy, the application site lies within the green
belt and is subject to assessment against Policy 4 - Green Belt and Rural Area of the
adopted SLLDP2.  This states the purpose of the green belt is to: direct development
to the most appropriate locations and support regeneration, protect and enhance the
character, landscape setting and identity of the settlement, protect and provide access
to open space. Development which does not require to locate in the countryside would
be expected to be accommodated within the settlements identified on the proposals
map. There are several instances where small scale residential developments could
be acceptable as set out in SLLDP2 and in this case the relevant policies are described
below.  
81

Page 82

10.5. GBRA4 Conversion and Re-use of Existing Buildings list a range of criteria which are
relevant to the proposal and are as follows:- 
1. Buildings shall be of a local, visual or historical merit which generally relates to
traditionally constructed buildings.
2. Buildings shall be suitable for conversion and a structural survey submitted to
determine the condition of the building to demonstrate that it is capable of
conversion to the proposed use.
3. The structure, form, setting, historic and architectural integrity of the original
buildings shall be respected and preserved so that they retain their traditional
appearance after conversion.
4. Any alterations, extensions or increase in height of the original building shall be
carried out sympathetically without detrimentally affecting the proportions or
character of the original building. 
10.6. It has already been established through the previous renewal, Listed Building Consent
and Planning Permission and structural survey (submitted as supporting information
with the original planning application), inspections and protective works undertaken to
date that the conversion and alterations are appropriate. The current application
relates to the house substitution on plot 2 and does not affect the approved conversion
of the Listed farmhouse and steading. 
10.7. Policy DM8 - Enabling Development advises that proposals for single houses or small-
scale housing shall be considered where it is required to fund works to a Listed
Building or other significant historical asset. Proposals will be required to meet the
following criteria:- 
⧫ It requires to be demonstrated that this is the only means to prevent the loss of
the asset and secure its long-term future
⧫ Evidence is required in all cases to demonstrate that other sources of funding
have been pursued and why these are unavailable or unable to fully fund the
project
⧫ Any new development shall be the minimum necessary to bridge any gap in
funding to achieve the works required
⧫ A business plan will be required. The expected demand and sale price of the
proposed dwelling(s) shall be evidenced and based on a local market
assessment
⧫ The development shall be designed and sited carefully to preserve and enhance
the character and setting of the historical asset and the surrounding landscape
or townscape
⧫ The location, siting and design of the new house(s) shall meet existing design
policy and guidance as set out in LDP2 and supporting planning guidance
In all cases, a Section 75 obligation and/or planning condition will be required to control
the phasing of the works in relation to the proposed dwellings 
10.8. Conditions to control phasing would be applied in the event approval is granted. In
consideration, the proposed development complies with Policies 4 - Green Belt and
Rural Area, GBRA4 – Conversion and Re-use of Existing Buildings and DM8 –
Enabling Development of the adopted Local Plan. 
10.9. Climate Change
NFP4 Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2 aim to ensure that proposals for
new development must, where possible, seek to minimise and mitigate against the
effects of climate change.  
82

Page 83

10.10. The site is not at risk of flooding. If planning permission is granted, conditions would
be attached requiring the submission and approval of details for low carbon
technology, for a tree planting scheme, protection measures for retained trees and the
installation of an electric vehicle charging point. The proposed house has been
orientated to maximise solar gain and natural daylight and an air heat source pump
would be installed, contributing towards the renewable production of domestic heat
and hot water.  Part of the proposal involves the re-use of a vacant building which ties
in with the objectives of sustainability.  In consideration, the proposals would not
undermine the objectives of Policy 2. 
10.11. Layout, Siting and Design
NPF4 Policy 14 Design, quality and place and SLLDP2 Policies 5 Development
Management and Placemaking and GBRA1 Rural Design and Development aim to
ensure well designed development that makes for successful places and considers
the impact on residential amenity and the appropriateness of the development to a
rural setting. 
10.12. The previous Planning Permission P/22/0345 for the conversion of the Listed Building
and erection of three bespoke designed dwellings, linked to enabling development,
confirmed compliance with relevant policies. The assessment of this application is
primarily focused on the appropriateness of the proposed amended design and house
position for the new build property at Plot 2. 
10.13. Although contemporary, the design is respectful of its surroundings and reflects the
scale, mass, and form of rural farm architecture. The proposal would have the
appearance of low lying agricultural buildings set back a reasonable distance from the
original historic steading, allowing a cohesive grouping. Internally it would be
adaptable to changing needs and lifestyle with an open plan living area. The proposed
house is not as bulky and, in terms of design quality, is better than the previously
approved house. 
10.14. The benefits of the outdoors to wellbeing are enhanced by access to an extensive
garden and covered patio. In considering distance from and orientation to, the
proposed dwelling would not impact unacceptably on existing and proposed
neighbouring dwellings in terms of privacy, overshadowing or loss of sunlight. The
level of light emission would not be significant, being similar to that omitted from
existing properties. The right of way, which passes through the site and is referred to
in the site plan, would not be impeded or blocked by this development. The proposed
dwelling would be positioned on the flattest area of the plot, thereby minimising the
need for land reprofiling and engineered excavations. 
10.15. The objectors rather than address the specific purpose of the application to change
the design and position of the house at plot 2, have repeated arguments against the
principle of the whole development which has already been subject to a series of
previous approvals, the most recent being approved in September 2023. These
approvals had already comprehensively considered all relevant issues including
impacts upon infrastructure, road network, traffic safety, residential amenity,
landscape, and biodiversity, concluding that there would be no adverse impacts. The
current proposal does not introduce any material changes necessitating a reappraisal
of assessments applying to the said previous consents. The proposal is therefore
satisfactory in terms of NFP4 Policy 14 and SLLDP2 Policies 5 and GBRA1. 
10.16. Policy 15 Local living and 20 minute neighbourhoods states: ‘Development proposals
will contribute to local living including, where relevant. To establish this, consideration
will be given to existing settlement pattern, and the level and quality of interconnectivity
83

Page 84

of the proposed development with the surrounding area, including local access to:
sustainable access (including local public transport and safe, high quality walking,
wheeling and cycling networks), employment, shopping, health and social care
facilities, schools and play areas.’ 
10.17. The site is in the countryside some distance from the nearby settlement of Crossford
and is not capable of achieving many of the characteristics of the 20-minute
neighbourhood or achieving wider local -living aspirations.  Notwithstanding this, for
the fit able pedestrian there is a path from the site down to the river edge where it joins
the Clyde walkway, a good quality path connecting through to Crossford, where a
range of services/facilities, approximately 1.2km to the south east, can be accessed.
In view of the circumstances described, the proposal does not fully accord with the
aims and intent of Policy 15 of National Planning Framework 4. 
10.18. Natural and Historic Heritage
NPF4 Policy 3 Biodiversity states that development proposals should contribute to the
enhancement of biodiversity, including where relevant, restoring degraded habitats,
and building and strengthening nature networks and the connections between them. 
10.19. The original application (CL/12/0180) was supported by an ecological assessment
which contained recommendations relating to the protection and enhancement of
wildlife, habitats, and flora. A protected species survey was also carried out prior to the
determination of the original application in July 2012 which made various
recommendations and the permission included a condition requiring an update to the
ecology report. That condition would be replicated on any subsequent permission and
would include a requirement for any mitigation measures proposed in the report to be
implemented. Biodiversity would be further enhanced by a proposed tree and
hedgerow planting scheme. No trees or habitat important to biodiversity are affected
by the proposed changes to Plot 2. The proposal is considered to comply with the
objectives of this policy subject to compliance with relevant conditions, and the
implementation of the recommendations contained within an updated ecological
assessment. 
10.20. NPF4 Policy 4 Natural Places is of relevance due to the site falling within a designated
Special Landscape Area as identified in the adopted Local Plan.  The policy states
‘Development proposals that affect a site designated as a local nature conservation
site or landscape area in the LDP will only be supported where: Development will not
have significant adverse effects on the integrity of the area or the qualities for which it
has been identified’. 
10.21. The development would respect the historic development pattern in this part of the
Clyde Valley and would not appear out of place. They are sited so that the setting of
the steading would not be adversely affected. In addition, existing trees, and proposals
to reinforce this planting, including the restoration of an historic orchard would further
aid the integration of the development. 
10.22. The scale, materials, and design of the proposed dwelling reflects some of the
characteristics found in the local rural area and the mix of materials and building
proportions add a modern interpretation to construction rather than being a pastiche
of the listed buildings. In addition, the site is reasonably self contained and the new
house would not be noticeably prominent in the setting of the wider landscape. The
backdrop of the existing farm steading and undulating topography along with tree
planting should ensure visual containment of the proposals in the surrounding
landscape and, as such, the proposal would not have an adverse impact upon the
84

Page 85

qualities and character of the designated Special Landscape Area. Therefore, the
proposal is considered acceptable with regards to Policy 4 of NPF4. 
10.23. NPF4 Policy 7 Historic assets and places states that development proposals for the
reuse, alteration or extension of a listed building will only be supported where they will
preserve its character, special architectural or historic interest and setting.
Development proposals which sensitively repair, enhance and bring historic buildings,
as identified as being at risk locally or on the national Buildings at Risk Register, back
into beneficial use will be supported.  Enabling development for historic environment
assets or places that would otherwise be unacceptable in planning terms, will only be
supported when it has been demonstrated that the enabling development proposed
is:- 
i. essential to secure the future of an historic environment asset or place which is
at risk of serious deterioration or loss; and 
ii. the minimum necessary to secure the restoration, adaptation and long-term
future of the historic environment asset or place. 
The beneficial outcomes for the historic environment asset or place should be secured
early in the phasing of the development and would be ensured through the use of
appropriate conditions.
10.24. The previous Planning Permission P/22/0345 accepted that three new dwellings were
justified as enablement to secure the satisfactory restoration and long term future of
the B-Listed Orchard Farmhouse and steading. In the case of Orchard Farm, a full
assessment of the proposal to convert it into three dwellings has been carried out
through the associated Listed Building Consent (P/22/0420), granted October 2022
which concluded that the principle of conversion is acceptable. Conditions are
recommended to ensure: that the funds from the sale of the plots will be invested into
the restoration of the Listed Building; approval of phasing details prior to the
commencement of development and; approval of external finishes/colours. In view of
the above assessment the proposal complies with Policy 7 of NPF4.
10.25. SLLDP2 Policy 14 – Natural and Historic Environment advises that the Council assess
all development proposals in terms of their impact on the natural and historic
environment, including biodiversity, geodiversity, landscape and townscape. In
Category 3 areas (which includes B and C listed Buildings their settings and Special
Landscape Areas) development which would have a significant adverse impact
following the implementation of mitigation measures will only be permitted where the
effects are outweighed by significant social or economic benefits. Where possible, any
development proposals which affect natural and historic designations should include
measures to enhance the conservation value of the site affected.
10.26. SLLDP2 Policy NHE3 – Listed Buildings states development affecting the setting of a
Listed Building shall seek to preserve its setting. The layout, design, materials, scale,
siting and use of any development shall be sensitive to and respect the character and
appearance of the Listed Building and its setting.
10.27. Policy NHE16 – Landscape advises that development proposals within Special
Landscape Areas will only be permitted where they can be accommodated without
having an unacceptable significant adverse effect on the landscape character, scenic
interest and special qualities and features for which the area has been designated. All
proposed development should take into account the detailed guidance contained in
the South Lanarkshire Landscape Character Assessment 2010.  
85

Page 86

10.28. The characteristics of the landscape around Orchard Farm, is of mature woodland with
narrow roads bordered by established hedgerows meaning that views of the new build
houses would be restricted. The new build element of the proposal would be viewed
against a backdrop of mature woodland on the western boundary which screens
Orchard Farm from the A72. Views of the development from within the Special
Landscape Area will therefore be restricted to the immediate locality. No historic or
landscape features which contribute to landscape quality would be affected by the new
dwellings and tree/hedgerow retention and a scheme of tree planting and orchard
restoration will ensure further integration of the development into its setting. 
10.29. In terms of the impact on landscape character, there are similar low density residential
developments nearby and, as such, this proposal can be integrated without appearing
out of place. Restoring an important Listed Building and saving it from dilapidation and
continuing deterioration is a positive outcome which would enhance the character of
the local area.  Assessment of details associated with the conversion works to the
listed buildings is acceptable and are subject of Listed Building Consent P/22/0420.
Although the proposed house at Plot 2 would be moved closer to the Listed Building,
a minimum distance of 60m will be maintained and the ridgeline of the proposed new
house will be 2.5m lower than the farmhouse – the new build would introduce contrast
and variety whilst complementing the original building group, reflective of how rural
steadings have evolved and expanded over the years. As such, the setting and
character of the Listed Building and Special Landscape Area would not be adversely
affected. In considering the above, the proposal complies with policies 14, NHE3 and
NHE16 of South Lanarkshire Local Development Plan 2. 
10.30. Conclusion
The principle of converting the Listed Building into residential units and erection of
three new dwellings has already been established. The application specifically relates
to alterations to the design and relocation of the new house within the confines of plot
2. These revisions are sensitive to the rural character and the setting of the Listed
Building and have resulted in marked improvements to the initial house design. In view
of the above, the proposal is an appropriate form of development for the site and
complies with National and Local Plan policies. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following conditions:- 
01. That the funds from the sale of the first plot shall cover the cost of servicing
the plots and that the remaining balance shall then be invested in the listed
building, starting with work to renew the roof of the Listed Building.  The
quantifying expenditure shall be submitted to the Council as Planning
Authority for verification before the second plot can be released for sale.   
The funds from the second Plot shall be further invested into the Listed
Building.  Work shall continue to be spent on the roof and on completion, any
remaining funds shall be spent on the inside of the Listed Building starting
with the windows.  Again, the quantifying expenditure shall be submitted to
the Council as Planning Authority for verification.  
Thereafter the third plot can be released for sale and funds from that sale
shall be directed towards the completion of the conversion and restoration of
the Listed Building.    
86

Page 87

Reason:  To ensure the proper and timeous restoration and conversion of the
Listed Building and to retain effective planning control.   
02. Details of the phasing of the development shall be submitted to the Council for
approval, and no work shall begin until the phasing scheme has been
approved in writing. Following approval, the development shall be
implemented in accordance with the approved scheme.     
Reason:  In order to retain effective planning control. 
03. No earlier than 6 months prior to works commencing on site, the Ecology
survey (JDC ecology, July 2012) shall be updated and submitted for the
written approval of the Council as Planning Authority. All mitigation measures
proposed therein including where necessary bat licence, installation of bat
boxes, 30 metre exclusion zone around any identified badger sett within the
application site, badger method statement and nesting bird method statement
shall be implemented in full, in accordance with the approved details.     
Reason:  In the interests of nature conservation. 
04. No development shall take place within the development site as outlined in
red on the approved plan until the developer has secured the implementation
of a programme of archaeological works in accordance with a written scheme
of investigation which has been submitted by the applicant, agreed by the
West of Scotland Archaeology Service, and approved by the Council as
Planning Authority. Thereafter the developer shall ensure that the programme
of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Council as Planning Authority in
agreement with the West of Scotland Archaeology Service.     
Reason:  In order to safeguard any archaeological items of interest or finds. 
05. That no trees within the application site shall be lopped, topped, pollarded or
felled, and no shrubs or hedges shall be removed from the application site
without the prior written consent of the Council as Planning Authority.   
Reason: To ensure the protection and maintenance of the existing trees and
other landscape features within the site. 
06. Prior to the commencement of the development hereby approved (including
any demolition and all preparatory work), a scheme for the protection of the
retained trees, in accordance with BS 5837:2012, including a tree protection
plan(s) (TPP) and an arboricultural method statement (AMS) shall be
submitted to and approved in writing by the Council as Planning Authority. 
Specific issues to be dealt with in the TPP and AMS are as follows:- 
a)  Location and installation of services/ utilities/ drainage. 
b)  Methods of demolition within the root protection area (RPA as defined 
in BS 5837: 2012) of the retained trees.      
c)  Details of construction within the RPA or that may impact on the 
retained trees.       
d)  A full specification for the installation of boundary treatment works. 
87

Page 88

e)  A full specification for the construction of any roads, parking areas and
driveways, including details of the no-dig specification and extent of the
areas of the roads, parking areas and driveways to be constructed
using a no-dig specification. Details shall include relevant sections
through them. 
f)  Detailed levels and cross-sections to show that the raised levels of     
surfacing, where the installation of no-dig surfacing within Root             
Protection Areas is proposed, demonstrating that they can be 
accommodated where they meet with any adjacent building damp                   
proof courses.    
g)  A specification for protective fencing to safeguard trees during both 
demolition and construction phases and a plan indicating the alignment
of the protective fencing.      
h)  A specification for scaffolding and ground protection within tree 
protection zones.  
i) Tree protection during construction indicated on a TPP and   
construction and construction activities clearly identified as prohibited           
in this area. 
j)  Details of site access, temporary parking, on site welfare facilities, 
loading, unloading and storage of equipment, materials, fuels and    
waste as well concrete mixing and use of fires. 
k)  Boundary treatments within the RPA. 
l)  Methodology and detailed assessment of root pruning. 
m)  Arboricultural supervision and inspection by a suitably qualified tree 
specialist. 
n)  Reporting of inspection and supervision 
o)  Methods to improve the rooting environment for retained and proposed 
trees and landscaping. 
p)  Veteran and ancient tree protection and management. 
The development shall thereafter be implemented in strict accordance with
the approved details.      
Reason:  To ensure that the trees to be retained will not be damaged during
demolition or construction and to protect and enhance the appearance and
character of the site and locality. 
07. All trees to be removed must be replaced by semi-mature/mature trees of a
similar species at the locus.   
Reason: In the interests of amenity. 
08. That before any work commences on the site, a scheme of landscaping for the
application site as outlined in red on the plans hereby approved, shall be
submitted to the Council as Planning Authority for written approval and shall
include:- 
(a) proposals to maintain and enhance the biodiversity of the site; 
(b) an indication of all existing trees and hedgerows plus details of those to be
retained and measures for their protection in the course of development; 
(c) details and specification of all trees, shrubs, grass mix, etc including,
where appropriate, the planting of fruit/apple trees; 
(d) details of any top-soiling or other treatment to the ground; 
(e) sections and other necessary details of any mounding, earthworks and
hard landscaping;  
88

Page 89

(f) proposals for the initial and future maintenance of the landscaped areas;
(g) details of the phasing of these works. 
For the avoidance of doubt no work shall be undertaken on the site until
approval has been given to these details.     
Reason: In the interests of the visual amenity of the area. 
09. That the landscaping scheme relating to the development hereby approved
under Condition 9 above, shall be carried out simultaneously with the
development, or each phase thereof as agreed appropriate.     
Reason:  In the interests of amenity. 
10. That before any work commences on site, a maintenance and management
scheme shall be submitted to and approved by the Council as Planning
Authority and it shall include proposals for the continuing care, maintenance
and protection of:- 
(a) the proposed footpaths; 
(b) the proposed parking areas; 
(c) the proposed grassed, planted and landscaped areas as approved under
the terms of Condition 9 above; and 
(d) the proposed boundary treatment.  
Reason:  To safeguard the amenity of the area. 
11. For the avoidance of doubt, no consent is granted for the physical sub-division
of any part of the courtyard within Orchard Farm, and at all times the
courtyard shall be kept free of walls, fences or other means of boundary
definition.     
Reason:  To safeguard the character and appearance of the Listed Building. 
12. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used
as external finishes on the development shall be submitted to and approved in
writing by the Council as Planning Authority.  
Reason: In the interests of amenity and in order to retain effective planning
control. 
13. That before any work commences on the site, sample panels of all the
proposed wall finishes shall be provided and no further work on the site shall
be commenced until the written approval of the Council as Planning Authority
has been granted for these finishes. The approved sample panels shall
remain in place throughout construction and be used as a quality template.
For the avoidance of doubt the sample panels for the natural stone and
natural slate walling shall clearly demonstrate the colour, texture and coursing
of the materials.   
Reason:  To ensure satisfactory integration of the new dwellinghouses with
the designated Greenbelt.  
89

Page 90

14. All external colours shall be agreed in writing with the Council as Planning
Authority prior to the commencement of works.   
Reason:  In the interests of amenity and in order to retain effective planning
control. 
15. That before development starts, details of all boundary treatments and their
location shall be submitted to and approved in writing by the Council as
Planning Authority and thereafter all approved works shall be completed in
accordance with the approved details prior to the development hereby
approved being occupied or brought into use.   
Reason:  In the interests of amenity and in order to retain effective planning
control. 
16. That notwithstanding the provisions of the Town and Country Planning
(General Permitted Development)(Scotland) Amendment Order 2011 (or any
such order revoking or re-enacting that order), no development shall take
place within the curtilage of the application site other than that expressly
authorised by this permission without the submission of a further planning
application to the Council as Planning Authority.     
Reason:  In the interests of the visual amenity of the area. 
17. That notwithstanding the terms of the Town and Country Planning (General
Permitted Development)(Scotland) Amendment Order 2011 (or any such
order revoking or re-enacting that order), no fences, walls or other means of
enclosure shall be erected on the site other than post and wire fences up to 1
metre in height or those expressly authorised by this permission without the
submission of a further planning application to the Council as Planning
Authority.   
Reason:  In the interests of amenity and in order to retain effective planning
control. 
18. That before any of the dwellinghouses hereby approved are brought into use,
a 6 metre wide dropped kerb verge crossing, with the kerb laid to delineate
the edge of the public road and hard surfaced for the first 6 metres behind the
edge of the public road, shall be constructed in accordance with the approved
specification and to the satisfaction of the Council as Roads and Planning
Authority.     
Reason:  In the interest of public safety. 
19.  That before any of the dwellinghouses hereby approved are completed or
brought into use, visibility splays of 2.4 metres by 100 metres measured from
the road channel shall be provided on both sides of the vehicular access and
everything exceeding 1.05 metres in height above the road channel level shall
be removed from the sight line areas and thereafter nothing exceeding 1.05
metres in height shall be planted, placed or erected within these sight lines.     
Reason:  In the interest of road safety  
90

Page 91

20. That before any of the dwellinghouses hereby approved are occupied, a
drainage system capable of preventing any flow of water from the site onto
the public road or neighbouring land, or into the site from surrounding land
shall be implemented.     
Reason:  To ensure the provision of a satisfactory drainage system. 
21. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council
as Planning Authority; such drainage arrangements will require to comply with
the principles of sustainable urban drainage systems and with the Council's
Developer Design Guidance (May 2020) and shall include the following
signed appendices: C 'Sustainable Drainage Design Compliance certificate',
D 'Sustainable Drainage Design Independent Check Certificate' and E
'Confirmation of Future Maintenance of Sustainable Drainage Apparatus' .
The development shall not be occupied until the surface drainage works have
been completed in accordance with the details submitted to and approved in
writing by the Council as Planning Authority. 
Reason: To ensure that the disposal of surface water from the site is dealt
with in a safe and sustainable manner, to return it to the natural water cycle
with minimal adverse impact on people and the environment and to alleviate
the potential for on-site and off-site flooding. 
22. Prior to the commencement of works a detailed plan of public access across
the site (existing, during construction and upon completion) shall be provided
for the approval of the Council as Planning Authority. 
For the avoidance of doubt this shall show:- 
a) all existing paths, tracks and rights of way, and any areas currently outwith
or excluded from statutory access rights*; 
b) any areas proposed for exclusion from statutory access rights, for reasons
of privacy, disturbance or curtilage, in relation to proposed buildings or
structures;   
c) all paths and tracks proposed for construction, for use by walkers, riders,   
cyclists, all-abilities users, etc; and 
d) any diversions of paths - temporary or permanent - proposed for the
purposes of the development.     
* under Part One of the Land Reform (Scotland) Act 2003.     
Reason:  In the interests of satisfactorily maintaining public rights of way.   
23. (a) The applicant shall be required to undertake a comprehensive site
investigation, carried out to the appropriate Phase level, to be submitted to
and approved in writing by the Council as Planning Authority. The
investigation shall be completed in accordance with the advice given in the
following:-   
(i) Planning Advice Note 33 (2000) and Part IIA of the Environmental
Protection Act 1990 (as inserted by section 57 of the Environment Act
1995);  
91

Page 92

(ii) Contaminated Land Report 11 - 'Model Procedures for the
Management of Land Contamination (CLR 11) - issued by DEFRA and
the Environment Agency; 
(iii) BS 10175:2001 - British Standards institution 'The Investigation of
Potentially Contaminated Sites - Code of Practice'.   
(b) If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment. If a Phase 2 investigation is required, then a
risk assessment of all relevant pollution linkages using site specific
assessment criteria will require to be submitted.   
(c) If the risk assessment identifies any unacceptable risks, a detailed
remediation strategy will be submitted to and approved in writing by the
Council as Planning Authority. No works other than investigative works shall
be carried out on site prior to receipt of the Council's written approval of the
remediation plan. 
Reason: To avoid unacceptable risks to human health and the environment,
to ensure that the land is remediated and made suitable for its proposed use.   
24. (a) Remediation of the site shall be carried out in accordance with the
approved remediation plan prior to the proposed development being brought
into use. Any amendments to the approved remediation plan shall not be
implemented unless approved in writing by the Council as Planning Authority.   
(b) On completion of the remediation works, the developer shall submit a
completion report to the Council as Planning Authority, confirming that the
works have been carried out in accordance with the approved remediation
plan and that the works have successfully reduced these risks to acceptable
levels. 
(c) Any previously unsuspected contamination which becomes evident during
the development of the site shall be brought to the attention of the Council as
Planning Authority within one week or earlier of it being identified. A more
detailed site investigation to determine the extent and nature of the
contaminant(s) and a site-specific risk assessment of any associated pollutant
linkages, shall then require to be submitted to and approved in writing by the
Council as Planning Authority.   
Reason: To avoid unacceptable risks to human health and the environment,
to ensure that the land is remediated and made suitable for its proposed use.   
25. No development shall commence at Plot 3 until:- 
a) a scheme of intrusive investigations has been carried out on site to 
establish the risks posed to the development by past coal mining
activity; and
b) any remediation works and/or mitigation measures to address land 
instability arising from coal mining legacy, as may be necessary, have
been implemented on site in full in order to ensure that the site is made
safe and stable for the development proposed.    
92

Page 93

The intrusive site investigations and remedial works shall be carried out in
accordance with authoritative UK guidance.   
Reason: To ensure safe development and mitigate against ground instability
on site for the lifetime of the development. 
26. Prior to the occupation of the dwelling house at Plot 3, a signed statement or
declaration prepared by a suitably competent person confirming that the site
is, or has been made, safe and stable for the approved development shall be
submitted to the Local Planning Authority for approval in writing. This
document shall confirm the methods and findings of the intrusive site
investigations and the completion of any remedial works and/or mitigation
necessary to address the risks posed by past coal mining activity.       
Reason: To ensure safe development and mitigate against ground instability
on site for the lifetime of the development. 
27. Prior to the commencement of development on site, details of the Sustainable
Urban Drainage System (SUDS) and its maintenance following installation
shall be submitted to and approved by the Planning Authority. The SUDS
shall be designed to ensure that contaminants present on the site are not
mobilised and that pollution pathways are not created. The Sustainable Urban
Drainage System shall thereafter be constructed in accordance with the
approved details.   
Reason: To ensure that no contaminated material leaves the site untreated in
order to protect public health, the water environment and to ensure that the
site is fit for its intended use. 
28. That the dwellinghouses shall not be occupied until the developer provides a
written agreement from Scottish Water and SEPA that the site can be served
by a water supply and sewerage scheme in accordance with relevant
standards and regulations.     
Reason: To ensure that the development is served by an appropriate effluent
disposal system and water supply. 
29. Prior to the commencement of development on site, an energy statement
covering the new build element of the approved development which
demonstrates that on-site zero and low carbon energy technologies contribute
at least an extra 10% reduction in CO2 emissions beyond the 2007 building
regulations carbon dioxide emissions standard, shall be submitted to and
approved in writing by the Council as Planning Authority. The statement shall
include:-       
a) the total predicted energy requirements and CO2 emissions of the
development, clearly illustrating the additional 10% reduction beyond the 2007
building regulations CO2 standard; 
b) a schedule of proposed on-site zero and low carbon energy technologies to
be included in the development and their respective energy contributions and
carbon savings;       
c) an indication of the location and design of the on-site energy technologies;
and 
93

Page 94

d) a maintenance programme for the on-site zero and low carbon energy
technologies to be incorporated.       
Reason: To secure a reduction in carbon dioxide emissions. 
30. The approved on-site zero and low carbon energy technologies shall be fully
installed and operational prior to the occupation of any approved buildings
and shall thereafter be maintained and shall remain fully operational in
accordance with the approved maintenance programme, unless otherwise
agreed in writing by the Council as Planning Authority. 
Reason: To secure the timeous implementation of on-site zero and low
carbon energy technologies. 
31. Prior to commencement of the development hereby approved, details of
measures to facilitate the provision of full fibre broadband to serve the
development, including details of appropriate digital infrastructure and a
timescale for implementation, shall be submitted to and approved in writing by
the Council as Planning Authority, unless otherwise agreed in writing with the
applicant. The approved measures shall thereafter be carried out in
accordance with the agreed implementation timescale.     
Reason: To ensure the provision of digital infrastructure to serve the
development. 
32. That prior to the commencement of works, details and locations of charging
points for electrical cars, at a rate of one charging point per house plot, shall
be submitted for the written approval of the Council as Planning Authority.
Prior to the completion of the development the approved charging points shall
be installed, available for use and thereafter maintained and replaced where
necessary to the satisfaction of the Council. 
Reason: To ensure facilities for recharging electrical cars are available for the
use of the residents. 
33. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
12. Reason for Decision
12.1. The proposal would not adversely impact on visual amenity, landscape quality, raises
no road safety concerns, conserves an important B-Listed Building and the application
site is self contained. In addition, the proposal meets the 3 tests for the renewal of
planning applications and accords with Policies 1, 2, 3, 4, 7, 8, 14 and 15 of National
Planning Framework 4 and Policies 2, 4, 5, 14, GBRA1, GBRA4, DM8, NHE3 and
NHE16 of the South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 17 June 2024 
94

Page 95

Background Papers
Further information relating to the application can be found online:-
P/24/0297 | Change of use of farm steading to form two dwellings, restoration of farmhouse
to form one dwelling, erection of three dwelling houses and associated access improvements
- Further application under Regulation 11 to amend layout and design of one of the
dwellinghouses approved under application P/22/0345. | Orchard Farm Waygateshaw Road
Carluke ML8 5PX 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
95

Page 96

96

Page 97

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 25 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0329
Proposal:  Demolition of Existing Building and Erection of 4 Terraced
Dwellinghouses with Associated Parking and Landscaping 
Site Address:  26 Church Street
Larkhall
ML9 1HE 
Applicant:  Lablik Homes 
Agent:  Wilson Architects
Ward:  14 - Larkhall
Application Type:  Full Planning Permission
Advert Type:  Non-notification of neighbours – Hamilton Advertiser
Development Plan
Compliance: 
Yes 
Departures:  Not applicable
Recommendation:  Grant subject to conditions
Legal Agreement:  Not applicable
Direction to
Scottish Ministers 
Not applicable 
11
97

Page 98

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee under Clause
16 of the South Lanarkshire Scheme of Delegation, namely the application has
received more than 5 objections. 
2. Site Description
2.1. The site is located in Larkhall to the south of the town centre and within close proximity
to the train station, bus services on the Main Street and the various services and
amenities Larkhall has to offer. The site is accessed off Gallowhill Road which is a no
through road to vehicular traffic.  However, it does provide a pedestrian link between
the Secondary School, Leisure Centre and the town centre.  The site was recently
used as a joinery workshop, yard and storage area. 
2.2. The site is bounded on the north by a vehicle repair unit and other commercial units. 
Residential areas are located to the east, south and west. 
3. Description of Proposed Development
3.1.  Planning permission is sought to erect four terraced two storey dwellings with
associated parking and landscaping. Each dwelling would contain 3 bedrooms, with
kitchen and lounge on the ground floor and separate rear garden areas. 
3.2. The proposed finishing materials include concrete roof tiles, reconstituted stonework,
cedral lining board and white render, with UPVC windows. Drainage is shown in the
form of an attenuation tank under the car parking. Connections to the public drainage
and water supply are proposed. 
3.3. During the handling of the application, amended plans have been submitted in order
to clarify boundary arrangements at the rear and relocate the bin storage area.  This
would allow refuse to be collected on Gallowhill Road, thus avoiding any conflict with
existing arrangements for bin storage and collection on Broomhill Court. Plans have
also added further landscaping, including hedging across the front of the site and
clarified arrangements for garden grounds and sustainable urban drainage. 
4. Relevant Planning History
4.1. A previous planning application for 8 flatted dwellings was refused in August 2023,
under reference P/21/1208 due to a lack of supporting information and
overdevelopment of the site. This current application has been submitted by the same
applicant and is an amended scheme. 
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
 Supporting Statement - setting out the design and access arrangements. 
6. Consultations
6.1. Roads Development Management – No objections subject to conditions relating to
surfacing and a construction traffic management plan. 
Response: Noted.  
6.2. Environmental Services – No objections.
Response: Noted. 
6.3. Scottish Water – No objections as there is sufficient water and waste water capacity.
Response: Noted.  
98

Page 99

7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of 8
representations have been received (7 objections, 1 comment, 0 support). The issues
raised are summarised as follows:- 
Road safety
 Conflicts with driveway on no. 7 Broomhill Court
 Concerns with the access onto Gallowhill, the road is overused by parking and
turning vehicles and the proposal would exacerbate present congestion, parking
issues and safety concerns for pedestrians using route
 Concerns in relation to insufficient parking within the site
 Request that the road is a resident access and pedestrian only and an alternative
access is found 
Damage to property 
 Concerns relating to existing boundary fence between the site and residents of
Broomhill Court 
Bin collection
 Concerns in relation to bin storage and collection taking place on Broomhill Court
(amended plans have resolved this issue) 
Construction matters
 Concerns relating to construction vehicles and parking 
Other matters
 Gallowhill is a private road and residents pay for street lighting, hedging and
grass 
The above issues are considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland. It sets out spatial principles, regional priorities, national developments, and
national planning policy. NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 – Climate mitigation and adaptation
 Policy 3 – Biodiversity
 Policy 9 – Brownfield, vacant and derelict land and empty buildings
 Policy 14 – Design, quality and place
 Policy 15 - Local living
 Policy 16 – Quality homes
 Policy 21 - Play, recreation and sport
 Policy 22 – Flood risk and management 
99

Page 100

8.3. South Lanarkshire Local Development Plan 2(2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2). In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change
 Policy 3 - General Urban Areas and Settlements
 Policy 5 - Development Management and Placemaking 
SLLDP2 Volume 2 Policies
 Policy DM1 - New Development Design
 Policy DM7 - Demolition and Redevelopment for Residential Use
 Policy SDCC7 - Low and Carbon Emissions from New Buildings
 Policy DM15 - Water Supply
 Policy DM16 - Foul Drainage/Sewerage Provision 
South Lanarkshire Council (SLC) Supporting Planning Guidance
Electric Vehicle Charging Points August 2022 
9. Guidance
9.1. Developing with Nature Guidance - Nature Scot 
10. Assessment and Discussion
10.1. Principle of Development
In terms of the principle of residential use on this site, the site is located within the
settlement of Larkhall. NPF4 Policy 16 - Quality Homes seeks to encourage,
promote, and facilitate the delivery of more high quality, affordable and sustainable
homes, in the right locations. NPF4 Policy 15 Local Living seeks to encourage,
promote and facilitate connected and compact neighbourhoods where people can
meet the majority of their daily needs within a reasonable distance of their home,
preferably by walking, wheeling or cycling or using sustainable transport methods.
NPF4 Policy 9 Brownfield, vacant and derelict land and empty buildings seeks to
encourage, promote and facilitate reuse of brownfield, vacant and derelict land and
reduce the need for greenfield development.  SLLDP2 Policy 3 General Urban Areas
is supportive of residential uses on appropriate sites. 
10.2. The site is not specifically allocated for housing within the LDP; therefore it requires
to be assessed against the terms of NPF4 Policy 16 part (f). Larkhall is a well-served
town with a train station, bus connections, secondary and primary schools, health
and social care facilities, major supermarkets and various types of employment
opportunities. The site itself is located in the centre of the town within close proximity
of the train station, the secondary school and town centre. The current site occupiers
have relocated, leaving the site temporarily vacant. Its use for residential would
reduce the need for greenfield development. 
10.3. It is considered the proposal is consistent with the spatial strategy, local living and 20
minute neighbourhoods.  The proposal is therefore considered to comply with part
(iii) of 16 (f) as the proposal is for a smaller scale opportunity within an existing
settlement boundary. A timing condition would be applied to any permission granted
in line with part (i).  Overall, the principle of the small-scale housing development can
therefore be accepted in this case.  There is no evidence of naturalisation or
biodiversity value on the site. The proposal meets the terms of Policies 16, 15 and 9
of NPF4 and Policy 3 of SLLDP2. 
100

Page 101

10.4. Climate Change
NPF4 Policy 1 requires that when considering all development proposals, significant
weight will be given to the global climate and nature crises. NPF4 Policy 2 Climate
Change and Mitigation expands on this, requiring all new developments to be sited
and designed (1) to minimise lifecycle greenhouse gas emissions as far as possible
and (2) to adapt to the current and future risks from climate change.  The Chief
Planner letter (4th February 2023) details that quantitative assessments shall be
required and guidance in this aspect will be forthcoming. Until such time this
proposal shall be assessed against SLLDP2 Policy 2 - Climate Change – which sets
out criteria which new development should address to help minimise and mitigate
against climate change. Thereby assisting in meeting the LDP overall strategic vision
and the Scottish Government’s targets relating to climate change. 
10.5. Policy SDCC7 – Low and Zero Carbon Emissions from Buildings - requests new
buildings, such as this proposal, are designed such that the carbon dioxide reduction
standard is met. NPF4 Policy 19 Heating and Cooling requires that buildings
occupied by people (i.e. dwellings) ensure sustainable temperature management
utilising passive methods where possible. NPF4 Policy 13 Sustainable Transport
seeks to encourage, promote and facilitate developments that prioritise walking,
wheeling, cycling and public transport for everyday travel and reduce the need to
travel unsustainably. 
10.6. The site is well located, within 1.6km of the train station and less than 200m from bus
connections on Church Street. There are no details of low or zero carbon
technologies on the site, however, this could be requested by condition. The site
layout has positioned the main living area windows to the south allowing for
sustainable temperature management. The dwellings themselves shall be required
to go through the Scottish Building Standards. A condition shall ensure provision of
electric car charging which has been shown on submitted plans. In addition, the
proposal will have no significant adverse impact on the water or soil environment, air
quality, biodiversity and/or green networks. Therefore, overall the proposal is
considered, on balance, to meet the terms of NPF4 Policies 1, 2, and 19 and
SLLDP2 Policies 2 and SDCC7. 
10.7. Layout, Siting and Design
NPF4 Policy 14 - Design, Quality and Place seeks to encourage, promote and facilitate
well designed development meeting the six qualities of successful places. SLLDP2
Policy 5 - Development Management and Placemaking and Policy DM1 - Design
seeks to ensure proposals are well-designed and integrated into the local area.
Proposals shall be suitable in terms of layout, scale, mass, design, impact on
neighbouring properties. The proposals shall also include suitable access, parking,
connections to public transport, sustainable urban design. NPF4 Zero Waste Policy
12 details that suitable bin storage inclusive of recycling bins shall be shown on site.
SLLDP2 Policy DM7 - Demolition and Redevelopment for Residential Use provides
guidance for this type of proposal. 
10.8. The site is well positioned within the town, close to sustainable transport modes and
services. The dwellings are not positioned in line with the established forward building
line. However, given the triangular nature of the site and the constraints this would
have placed on overlooking and lack of garden ground, it is considered that the current
layout with the addition of landscaping to the front of the development is suitable. The
scale of development at 2 storey is taller than those dwellings directly adjacent and
there is an increase in the existing site levels. However, given the position of the
proposed dwellings, the location in proximity to the town centre and 3 storey flatted
dwelling to the rear of the site, it is considered that the scale and density is appropriate
101

Page 102

in this context. The proposed terrace and position of windows and distance from other
properties does not pose unacceptable overlooking or overshadowing issues. 
10.9. Each proposed dwellinghouse would have sufficient garden ground for the
surrounding context, which is positioned south facing as is the living area. The layout
includes 2 parking spaces per dwelling, with electric car charging shown on the plans.
The communal landscaping would be kept to a minimum, whilst still creating a pleasant
place. Suitable bin storage arrangements are proposed.   
10.10. NPF4 Policy 21 (d) Play, recreation and sport details that any dwelling occupied by
children and young people shall incorporate well-designed, good quality provision for
play, recreation and relaxation which is proportionate to the development and existing
provision in the area.  In this context, it is not considered proportionate to request play
provision. 
10.11. Concerns have been raised in relation to the use of Gallowhill as the access point for
the proposal. The previous application, which was refused, proposed Broomhill Court
as the access point and this was the basis for one of the reasons for refusal. The
recently relocated joinery business utilised this site and a similar access point to that
now proposed. The scale of traffic movements associated with a joinery/yard/storage
business (which is the current lawful use of the site) and 4 dwellinghouses (proposed)
are unlikely to be materially different. Roads, Transportation and Fleet Services have
not raised any objections to the use of Gallowhill as the access point for the proposal. 
10.12. The proposal therefore meets the terms of NPF4 Policies 14 and 12 and SLLDP2
Policies 5, DM1 and DM7. 
10.13. Biodiversity
NPF4 Policy 3(c) Biodiversity details that all local developments shall include
appropriate measures to conserve, restore and enhance biodiversity. The Developing
with Nature Guidance is pertinent in this case. The guidance encourages a mitigation
hierarchy to be applied - avoid, minimise, restore and offset to achieve a net positive
biodiversity impact. There is no notable biodiversity on site to avoid or minimise impact
upon. The amended plans include a hedge along the frontage of the site and
landscaping planting including a mix of plants to the front, chosen to be suitable for
the urban location.  It is considered given scale and location of the site that these
measures are suitable. Therefore, subject to conditions, the proposal meets the terms
of NPF4 Policy 3. 
10.14. Technical Matters
SLLDP2 Policy SDCC 3 - Sustainable Urban Drainage seeks to ensure suitable
sustainable urban drainage. NPF4 Policy 22 - Flood risk and water management
details that proposals shall not increase the risk of surface water to others or
themselves. Additionally, all rain and surface water should be managed through SUDS
and form part of the proposed/existing, blue/green infrastructure and areas of
impermeable surfaces are to be minimised. The site is not at risk from river or surface
water flooding. 
10.15. The submitted information details an attenuation tank shall be utilised on site.
However, Scottish Water have advised no connection to the pubic sewar for surface
water except in exceptional circumstances and only in cases of brownfield land. This
site could be considered brownfield and there is limited area within the site. It is
considered acceptable in this case to allow the developer to investigate connections
post planning determination and prior to a site start. Therefore, a condition requiring
confirmation that a connection is achievable shall be required before any works
102

Page 103

commence on site. On this basis, the proposal meets the terms of SLLDP2 Policy
SDCC3 and NPF4 Policy 22. 
10.16. SLLDP2 Policy DM16 - Water Supply and Policy DM16 - Foul Drainage seeks to
ensure appropriate water supply and foul drainage arrangements. The application
form details connections will be made to the existing public water and sewerage
system. Therefore, the proposal meets the terms of Policy DM15 and DM16 
10.17. Conclusion 
In conclusion, the proposal seeks planning permission for 4 terraced dwellings. The
site is well located within the settlement boundary of Larkhall and is a suitable location
for residential use. The proposal is a suitable layout and design for the surrounding
area, providing an attractive landscaped frontage and suitable parking, inclusive of
electric vehicle charging, garden ground and bin storage. Overall, it is considered that
the proposals comply with the provisions of the relevant policies within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.  
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That no development shall commence on site until written confirmation is
submitted to the Council as Planning Authority confirming that Technical
Approval or Permission to Connect has been agreed with Scottish Water. 
Reason: To ensure there are suitable surface water drainage arrangements
prior to site start. 
03. That prior to any works starting on site, an energy statement including details
of low/zero carbon technologies shall be submitted for the written approval of
the Planning Authority.  The development shall then be completed in
accordance with the approved details.   
Reason: To secure the timeous implementation of renewable and/or low carbon
energy technologies. 
04. That before any dwellinghouse hereby approved is completed or brought into
use, an electric vehicle charging point shall be provided for each dwelling, and
thereafter retained, and be capable of delivering a minimum 7kw charge all in
accordance with the Council's 'Supporting Planning Guidance - Electric Vehicle
Charging Points August 2022'.   
Reason: To ensure timely and continued provision of electric vehicle charging
point.  
103

Page 104

05. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used
as external finishes on the development shall be submitted to and approved in
writing by the Council as Planning Authority.  
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
06. Prior to the commencement of any works associated with the development, a
Construction Traffic Management Plan shall be submitted to and approved in
writing by the Council as Roads and Planning Authority and implemented
thereafter. This document shall include details of access, egress, turning of
construction vehicles, parking provision (including a parking plan) for staff and
operatives, intended working hours, the management and storage of deliveries
and the provision of wheel washing facilities.   
Reason: In order to retain effective planning control. 
07. That prior to the occupation of any dwellinghouse hereby approved, the first two
metres of the car park access shall be surfaced across its full width. 
Reason: In the interests of traffic and public safety. 
08. The landscaping scheme as shown on approved plan 2142-05 Rev B, shall be
implemented during the first available planting season following completion of
the development hereby approved.   
Reason: To minimise the level of visual intrusion, and to protect the quality and
character of the area as far as practicable. 
09. That prior to the occupation of any dwellinghouse, hereby approved, the parking
layout as shown on approved plan 2142-05 Rev B shall be finished in a
permeable surface and thereafter retained. 
Reason: In the interests of traffic and road safety and surface water drainage. 
10. That notwithstanding the provisions of the Town and Country Planning (General
Permitted Development)(Scotland) Order 2011, the hedge as shown on
approved plan 2142-05 Rev B shall be retained and maintained along the
frontage of the site .   
Reason: To safeguard the residential and visual amenity of the area and in the
interests of biodiversity. 
11. Prior to the commencement of development on site, a dilapidation survey shall
be conducted on Gallowhill.  The scope of the dilapidation survey shall be
agreed in writing with the Planning Authority and thereafter the findings shall be
submitted to and agreed with the Planning Authority.  The access road shall be
maintained and/or repaired by the developer in accordance with the agreed
details. 
Reason:  In the interest of road and pedestrian safety.  
104

Page 105

12. Reason for Decision
12.1. The application seeks detailed planning permission for four terraced dwellings. The
site is suitable for residential use and the design and layout is suitable for the
surrounding area. There is no significant adverse impact on amenity, public safety or
the local environment. The proposal complies with Policies 1, 2, 3, 9, 12, 14, 16, 19,
21, 22 of National Planning Framework 4 (adopted 2023) and Policies 2, 3, 5,
SDCC3, DM1, DM15, DM16 and SDCC7 of South Lanarkshire Local Development
Plan 2 (adopted 2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 17 June 2024 
Background Papers
Further information relating to the application can be found online:- 
P/24/0329 | Demolition of existing building and erection of 4 terraced dwellinghouses with
associated parking and landscaping. | 26 Church Street Larkhall ML9 1HE
(southlanarkshire.gov.uk) 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
105