Agenda Document Pack - Planning Committee - 19/08/2025

South Lanarkshire Council · 19 August 2025
Back to Planning Committee — 19 August 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 11 August 2025 
Dear Councillor 
Planning Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 19 August 2025
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton, ML3
0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Richard Nelson (Chair), Gerry Convery (Depute Chair), Joe Fagan (ex officio), Alex Allison,
Ralph Barker, Archie Buchanan, Ross Clark, Margaret Cowie, Maureen Devlin, Colin Dewar,
Mary Donnelly, Alistair Fulton, Celine Handibode, Graeme Horne, Cal Johnston-Dempsey,
Ross Lambie, Martin Lennon, Lesley McDonald, Davie McLachlan, Norman Rae, John Ross,
Graham Scott, David Shearer, Helen Toner, David Watson 
Substitutes
Walter Brogan, Robert Brown, Mathew Buchanan, Margaret Cooper, Poppy Corbett, Allan
Falconer, Grant Ferguson, Gladys Ferguson-Miller, Richard Lockhart, Julia Marrs, Ian
McAllan, Kenny McCreary, Bert Thomson
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Planning Committee held on 17 June 2025
submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Item(s) for Noting 
3 Local Place Plans - Stonehouse, Strathaven and Glassford and
Lanark
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
11 - 14 
Item(s) for Decision 
4 Application P/24/0165 for Erection of Housing Development (170
Homes) on Undeveloped Vacant Land with Landscaping, Play Areas,
Drainage, Road Layouts, New Access Arrangements and Associated
Development at Station Road, Netherburn, Larkhall
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
15 - 30 
5 Application P/24/0573 for Redevelopment of Existing Farm Buildings
to Provide Farm Workers Dwellings, New Agricultural Buildings,
Estate Office and Main Farmhouse with Access, Landscaping and
Associated Infrastructure - Application to Discharge Conditions 1, 2,
3, 4, 5, 6, 8, 9, 11, 12, 13, 15, 16, 17, 18, 19 and 20 of Planning Consent
P/20/1047 at Auchentibber Farm, Auchentibber Road, Blantyre
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
31 - 36 
6 Application P/24/1137 for Redevelopment of Existing Farm Buildings
to Provide Farm Workers Dwellings, New Agricultural Buildings,
Estate Office and Main Farmhouse with Access, Landscaping and
Associated Infrastructure - Application to Discharge Conditions 7, 10
and 14 of Planning Consent P/20/1047 at Auchentibber Farm,
Auchentibber Road, Blantyre
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
37 - 42 
7 Application P/24/0681 for Extension to Cloburn Quarry to Allow for
Continued Extraction and Processing of Hard Rock at Cloburn
Quarry, Thankerton, Lanark
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
43 - 62
2

Page 3

8  Application P/24/0856 for Erection of House for Retiring Farm Worker
at Land 66 Metres Northeast of Crown House Farm, Struther Highway,
Sandford, Strathaven
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
63 - 68 
9 Application P/24/1236 for Construction and Operation of Renewable
Energy Development, Comprising 22 Wind Turbines, Solar Array,
Battery Energy Storage System and Associated Infrastructure
(Consultation from Scottish Ministers Under Section 36 of the
Electricity Act 1989) at Land Either Side of M74 Immediately to the
Northwest of Abington Service Station and Approximately 4.5km
Southwest of Douglas
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
69 - 80 
10  Application P/24/1561 for Erection of Residential Development
Comprising of 64 Detached Houses, Access Roads, Landscaping,
Land Engineering Operations and Associated Work, Including
Demolition of House at Land 100 Metres North of Beechfield Manor,
Meikle Earnock Road, Hamilton
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
81 - 94 
11  Application P/25/0229 for Change of Use of Nursery (Class 10) to 3
Retail/Professional Service Units (Class 1A) on Ground Floor and
HMO Flatted Dwelling (Sui Generis) on First Floor and Associated
Alterations, and Formation of Car Park at 51 Machan Road, Larkhall
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
95 - 102 
12  Application P/25/0360 for Erection of 2 Storey House for Agricultural
Worker at Land 200 Metres Southeast of Newton Farm, Newton
Highway, Strathaven
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
103 - 110 
13  Application P/25/0388 for Installation of a 20MW Battery Energy
Storage System (BESS) with Associated Infrastructure at Plot 4A,
Hurlawcrook Road, East Kilbride
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
111 - 120 
14  Application P/25/0432 for Change of Use of House (Class 9) to
Children's Residential Care Home to Accommodate 4 Children, (Class
8 Residential Institution) at 36 Wellhall Road, Hamilton
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
121 - 128
3

Page 4

15  Application P/25/0517 for Section 42 Application for Variation of
Condition 1 and Deletion of Condition 22 of P/22/0349 Planning
Permission in Principle (Residential Developments with Associated
Landscaping, Roads, Neighbourhood Centre, Community Facilities
and Infrastructure Works (with Environmental Impact Analysis)) to
Allow for Any Detailed Design for Further Approval of Matters
Specified in Conditons at Larkhall Community Growth Area,
Summerlee Road, Larkhall
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
129 - 142 
16  Application P/25/0529 for Installation of Flue to Rear Elevation of
Existing Building at 15 Montgomery Street, East Kilbride
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
143 - 150 
17  Application P/25/0711 for External Alterations Associated with
Erection of a Flue to the Rear (Listed Building Consent) at 15
Montgomery Street, East Kilbride
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
151 - 156 
18  Application P/25/0555 for Installation of a Battery Energy Storage
System (BESS) with a Capacity of up to 30MW and Associated
Infrastructure at Land at Langlands Gate, East Kilbride
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
157 - 166 
19  Application P/25/0598 for Change of Use of Flatted Dwelling (Sui
Generis) to Short-Term Let (Sui Generis) (Retrospective) at Flat 3, 2
School Street, Hamilton
Report dated 11 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
167 - 172 
Urgent Business 
20  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
4

Page 5

PLANNING COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 17 June 2025 
Chair:
Councillor Richard Nelson 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Archie Buchanan, Councillor Ross
Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cowie, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Mary Donnelly, Councillor Alistair Fulton, Councillor Celine
Handibode, Councillor Ross Lambie, Councillor Lesley McDonald, Councillor Davie McLachlan,
Councillor John Ross, Councillor David Shearer, Councillor Helen Toner 
Councillors' Apologies:
Councillor Joe Fagan (ex officio), Councillor Graeme Horne, Councillor Cal Johnston-Dempsey,
Councillor Martin Lennon, Councillor Norman Rae, Councillor Graham Scott, Councillor David
Watson 
Attending:
Community and Enterprise Resources
F Carlin, Head of Planning and Regulatory Services; B Darroch, Planning Area Manager (East
Team); F Jack, Team Leader, Development Management Team, Roads, Transportation and Fleet
Services; D Russell, Planning Area Manager (West Team)
Finance and Corporate Resources
S Jessup, Administration Assistant; S McLeod, Administration Officer 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Planning Committee held on 20 May 2025 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Application P/24/1246 for Erection of 152 Dwellings with Associated Infrastructure
Works and Landscaping at Land 235 Metres Southeast of Whiteshawgate Cottage,
Whiteshawgate Highway, Strathaven 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/24/1246 by Bancon Homes and Paterson Partners for
the erection of 152 dwellings with associated infrastructure works and landscaping at land 235
metres southeast of Whiteshawgate Cottage, Whiteshawgate Highway, Strathaven. 
At its meeting on 7 July 2015, the Committee had approved a procedure for processing planning
applications which required completion of a Legal Agreement.  If approved, the application
would be subject to a Legal Agreement and/or other appropriate mechanism and the approved
procedure would apply.
2
5

Page 6

The Committee decided: that planning application P/24/1246 by Bancon Homes and
Paterson Partners for the erection of 152 dwellings with
associated infrastructure works and landscaping at land
235 metres southeast of Whiteshawgate Cottage,
Whiteshawgate Highway, Strathaven be granted subject
to:- 
 the conditions specified in the Executive Director’s
report
 the conclusion of a Section 75 Agreement and/or
other appropriate agreement between the Council,
site owner(s) and the applicant 
[Reference:  Minutes of 7 July 2015 (Paragraph 15)] 
4 Application P/24/1527 for Erection of 28 Flats (4 Blocks - 3-Storey to the Front and
2-Storey to the Rear of Site) with Associated Access Road, Parking, Bike and Bin
Enclosures, Landscaping and Demolition of Double Garage at Vacant Land at
Ladyacre Road, Lanark 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/24/1527 by Zoom Developments Holdings Limited for
the erection of 28 flats (4 blocks – 3 storey to the front and 2 storey to the rear of the site) with
associated access road, parking, bike and bin enclosures, landscaping and demolition of double
garage at vacant land at Ladyacre Road, Lanark. 
The Committee decided: that planning application P/24/1527 by Zoom
Developments Holdings Limited for the erection of 28 flats
(4 blocks – 3 storey to the front and 2 storey to the rear of
the site) with associated access road, parking, bike and bin
enclosures, landscaping and demolition of double garage
at vacant land at Ladyacre Road, Lanark be granted
subject to the conditions specified in the Executive
Director’s report. 
[Reference:  Minutes of 28 May 2024 (Paragraph 5)] 
5 Application P/24/1526 for Demolition of Double Garage at Vacant Land at
Ladyacre Road, Lanark 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/24/1526 by Zoom Developments Holdings Limited for
the demolition of a double garage at vacant land at Ladyacre Road, Lanark. 
The Committee decided: that planning application P/24/1526 by Zoom
Developments Holdings Limited for the demolition of a
double garage at vacant land at Ladyacre Road, Lanark be
granted subject to the condition specified in the Executive
Director’s report. 
[Reference:  Minutes of 28 May 2024 (Paragraph 4)]
6

Page 7

6 Application P/24/1545 for Erection of House at Eastford, B7016 from Forth A706 to
Carnwath A70, Forth, Lanark 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/24/1545 by S Carruthers for the erection of a house at
Eastford, B7016 from Forth A706 to Carnwath A70, Forth, Lanark. 
Following discussion, during which an officer responded to members’ questions on various
aspects of the report, Councillor Nelson, seconded by Councillor Convery, moved that the
application be refused for the reasons detailed in the Executive Director’s report.  Councillor
Allison, seconded by Councillor Shearer, moved that the application be granted, subject to
conditions to be agreed by the Committee, on the grounds that the application site was within
the curtilage of other buildings and was an ideal site to contribute towards increasing the
population in the rural area without being detrimental to either the green belt or rural area.  On a
vote being taken using the electronic voting system, 8 members voted for the amendment and
10 for the motion which was declared carried. 
The Committee decided: that planning application P/24/1545 by S Carruthers for the
erection of a house at Eastford, B7016 from Forth A706 to
Carnwath A70, Forth, Lanark be refused for the reasons
detailed in the Executive Director’s report. 
7 Application P/25/0044 for Construction and Operation of Battery Energy Storage
System (BESS) with Associated Infrastructure and Access Points (Consultation
from Scottish Ministers Under Section 36 of the Electricity Act 1989) at Land at
Red Moss, B7078, Crawfordjohn, Biggar 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/25/0044 by GSC Red Moss Limited for the construction
and operation of a battery energy storage system (BESS) with associated infrastructure and
access points (consultation from Scottish Ministers under Section 36 of the Electricity Act 1989)
at land at Red Moss, B7078, Crawfordjohn, Biggar. 
The proposal had been submitted to the Scottish Government under Section 36 of the Electricity
Act 1989 as it had an electricity generating capacity of over 50 megawatts (MW).  As a result,
the Council was a consultee to the application and not the consenting authority. 
The application was considered acceptable on the basis that it accorded with the relevant
policies in the National Planning Framework 4 and adopted South Lanarkshire Local
Development Plan 2. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: 
(1) that the Scottish Government be informed that South Lanarkshire Council had no
objections to planning application P/25/0044 by GSC Red Moss Limited for the
construction and operation of a battery energy storage system (BESS) with associated
infrastructure and access points (consultation from Scottish Ministers under Section 36 of
the Electricity Act 1989) at land at Red Moss, B7078, Crawfordjohn, Biggar; 
(2) that the Head of Planning and Regulatory Services be authorised to undertake any
discussions in relation to further agreements on the proposed conditions, if required, with
the Scottish Government; and
7

Page 8

(3) that, in addition, the Scottish Government be advised that approval should be subject to
the conclusion of:- 
 a legal agreement covering community contribution payments
 an agreement under Section 96 of the Roads (Scotland) Act 1984 
[Reference:  Minutes of 7 July 2015 (Paragraph 15)] 
8 Application P/25/0087 for Subdivision of Garden Ground, Demolition of Detached
Garage and Car Port and Erection of Dwelling with Associated Works at Trickle
Trout, Highflatt Road, Carmunnock 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/25/0087 by C Flynn and H Armstrong for the
subdivision of garden ground, demolition of detached garage and car port and erection of a
dwelling with associated works at Trickle Trout, Highflatt Road, Carmunnock. 
The Committee decided: that planning application P/25/0087 by C Flynn and H
Armstrong for the subdivision of garden ground, demolition
of detached garage and car port and erection of a dwelling
with associated works at Trickle Trout, Highflatt Road,
Carmunnock be refused for the reasons detailed in the
Executive Director’s report. 
9 Application P/25/0164 for Erection of House and Associated Infrastructure at Tinto
View Road, Ashgill, Larkhall 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/25/0164 by A Lister for the erection of a house and
associated infrastructure at Tinto View Road, Ashgill, Larkhall. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/25/0164 by A Lister for the
erection of a house and associated infrastructure at Tinto
View Road, Ashgill, Larkhall be refused for the reasons
detailed in the Executive Director’s report. 
10 Application P/25/0274 for Construction and Operation of Battery Energy Storage
System (BESS) with Associated Infrastructure and Access Point (Consultation
from Scottish Ministers Under Section 36 of the Electricity Act 1989) at Land
1.7km South of Millbank, A70 to Abington Interchange A702, Douglas 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/25/0274 by BayWa R.e. UK Limited for the construction
and operation of a Battery Energy Storage System (BESS) with associated infrastructure and
access point (consultation from Scottish Ministers under Section 36 of the Electricity Act 1989)
at land 1.7km south of Millbank, A70 to Abington Interchange A702, Douglas. 
The proposal had been submitted to the Scottish Government under Section 36 of the Electricity
Act 1989 as it had an electricity generating capacity of over 50 megawatts (MW).  As a result,
the Council was a consultee to the application and not the consenting authority.
8

Page 9

The application was considered acceptable on the basis that it accorded with the relevant
policies in the National Planning Framework 4 and adopted South Lanarkshire Local
Development Plan 2. 
The Committee decided: 
(1) that the Scottish Government be informed that South Lanarkshire Council had no
objections to planning application P/25/0274 by BayWa R.e. UK Limited for the
construction and operation of a battery energy storage system (BESS) with associated
infrastructure and access point (consultation from Scottish Ministers under Section 36 of
the Electricity Act 1989) at land 1.7km south of Millbank, A70 to Abington Interchange
A702, Douglas; 
(2) that the Head of Planning and Regulatory Services be authorised to undertake any
discussions in relation to further agreements on the proposed conditions, if required, with
the Scottish Government; and 
(3) that, in addition, the Scottish Government be advised that approval should be subject to
the conclusion of:- 
 a legal agreement covering community contribution payments
 an agreement under Section 96 of the Roads (Scotland) Act 1984 
[Reference:  Minutes of 7 July 2015 (Paragraph 15)] 
11 Application P/24/1492 for Erection of House for Retiring Farm Worker at
Burnwynd Farm, A723 from Strathaven to Hamilton, Strathaven 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/24/1492 by R Reid for the erection of a house for a
retiring farm worker at Burnwynd Farm, A723 from Strathaven to Hamilton, Strathaven. 
There followed a discussion on the application during which officers responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/24/1492 by R Reid for the
erection of a house for a retiring farm worker at Burnwynd
Farm, A723 from Strathaven to Hamilton, Strathaven be
refused for the reasons detailed in the Executive Director’s
report. 
12 Application P/25/0333 for Erection of Horse Training Centre for Proposed Equine
Business Operation at Burnwynd Farm, A723 from Strathaven to Hamilton,
Strathaven 
A report dated 9 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/25/0333 by R Reid for the erection of a horse training
centre for a proposed equine business operation at Burnwynd Farm, A723 from Strathaven to
Hamilton, Strathaven. 
There followed a discussion on the application during which officers responded to a member’s
question on an aspect of the report.
9

Page 10

The Committee decided: that planning application P/25/0333 by R Reid for the
erection of a horse training centre for a proposed equine
business operation at Burnwynd Farm, A723 from
Strathaven to Hamilton, Strathaven be refused for the
reasons detailed in the Executive Director’s report. 
13 Urgent Business 
There were no items of urgent business. 
10

Page 11

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject Local Place Plans – Stonehouse, Strathaven and
Glassford and Lanark 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose
 inform Planning Committee on the preparation and submission of a Local Place
Plan (LPP) for Stonehouse, Strathaven and Glassford, and Lanark
 advise that Supporting Statements for the Plans demonstrate that the Local Place
Plan legislative requirements have been met 
[
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) to note the preparation and submission of Local Place Plans for Stonehouse,
Strathaven and Glassford, and Lanark; and
(2) to note that Supporting Statements for the Plans, that demonstrate that the Local
Place Plan legislative requirements have been met, have been registered by the
Council and added to the Local Place Plan register on the Council’s website.
[1re
3. Background 
3.1. Local Place Plans are community produced documents that set out proposals for the
development and use of land.  They were introduced by the Town and Country
Planning (Scotland) 2019 Act and are intended to show community aspirations for
future development. 
3.2. Regulations to support the preparation of LPPs came into force on 22 January 2022
and these set out the steps a community must take to ensure that their LPP can be
registered as valid. 
3.3. A LPP must have regard to the Council’s currently adopted Local Development Plan
(LDP2) and National Planning Framework 4 (NPF4) as well as the Council’s
Community Plan.  The LPP gives the community the opportunity to put forward
proposals to amend the LDP, but it must submit a statement outlining the reasons for
proposing this.  These amendments must be taken into consideration when preparing
a new LDP.  
3
11

Page 12

3.4. The Community Body preparing the LPP must carry out a minimum amount of
engagement to ensure it reflects the aspirations of local residents and stakeholders. 
It is a statutory requirement that the Community Body ensures that it contacts all
councillors within the LPP area as well as any community councils within the plan area
or any that adjoin it.  They are also required to seek the wider community’s views on
the proposed LPP. 
4. Current Position
4.1. As part of the preparation of Local Development Plan 3 (LDP3), the Council published
an invitation to prepare LPP’s and this was carried out in late 2023.  At the same time
a dedicated webpage was created to provide information on how to prepare an LPP
and links to other resources available to communities. 
4.2. The Council recently received separate LPP’s for registration covering the
Stonehouse, Strathaven and Glassford, and Lanark areas.  All of them comply with
the regulatory requirements. 
4.3. At this stage it is not the role of the planning authority to assess the proposals
contained within the LPP for their planning merit or deliverability.  They will, however,
be taken into consideration during the preparation of LDP3. 
5. Next Steps
5.1. The LPPs have been checked for validation, and it has been shown the requirements
set out in legislation have been met.  As a result, the Council has registered them on
the website. 
5.2. They can be viewed via this link Register of Local Place Plans - South Lanarkshire
Council.  The Community Bodies will also be advised that registration has taken place. 
5.3. As noted above, the proposals in the LPP’s will be taken into consideration when the
proposed LDP3 is being prepared.  Reference will also be made to them in the
Evidence Report which will be considered by the full Council prior to submission to
Scottish Ministers later this year. 
6. Employee Implications
6.1. The processes involved in validating the LPP’s have been carried out using existing
staff resources within Planning and Regulatory Services. 
7. Financial Implications
7.1. The financial resources required to assess and register the LPP’s will be met from
current budget levels available to Planning and Regulatory Services. 
8. Climate Change, Sustainability and Environmental Implications
8.1. As the LPPs have been prepared by external organisations Strategic Environmental
Assessment (SEA) is not a requirement in this case. 
9. Other Implications
9.1. The Planning Service must take the LPPs into account during the preparation of Local
Development Plan 3.  
12

Page 13

10. Integrated Impact Assessment and Consultation Requirements
10.1. The Local Place Plans have been prepared by community bodies.  Under the relevant
legislation there is no requirement for the Council to carry out consultation, however,
the LPP preparation process was subject to extensive consultation by the community
bodies themselves.  In addition, there is no requirement for the Council to carry out an
Integrated Impact Assessment, Child Rights and Wellbeing and a Fairer Scotland Duty
Assessment. 
David Booth
Executive Director (Community and Enterprise Resources) 
11 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Good quality, suitable and sustainable places to live
 We will work towards a sustainable future in sustainable places 
Previous References
 None 
List of Background Papers
 National Planning Framework 4 - 13 February 2023
 Town and Country Planning (Scotland) Act 2019 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tony Finn, Area Manager
Email: Tony.Finn@southlanarkshire.gov.uk 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0165
Proposal:  Erection of housing development (170 homes) on undeveloped vacant
land with landscaping, play areas, drainage, road layouts, new access
arrangements and associated development 
Site Address:  Station Road
Netherburn
Larkhall
Applicant:  Avant Homes Scotland Ltd and Netherburn Green Ltd
Agent:  Farningham Planning Ltd
Ward:  20 Larkhall
Application Type:  Detailed Planning Permission
Advert Date:  Hamilton Advertiser 30 January 2025
Development Plan
Compliance: 
Yes 
Departures:  No
Recommendation:  Grant subject to conditions and legal agreement
Legal Agreement:  Yes – to secure financial contributions towards education, community
facilities and affordable housing.
Direction to
Scottish Ministers 
N/A 
4
15

Page 16

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a Major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the South Lanarkshire Council Scheme of
Delegation requires that all major applications are determined by the Planning
Committee. 
2. Site Description
2.1. The site extends to 6.75 ha and occupies a central location within the settlement of
Netherburn, 3 miles southeast of Larkhall.  It is currently vacant, was formerly
managed for agriculture and comprises grassland habitats.  To the north, the site is
bounded by Netherburn Primary School, a playground and a football pitch.  To the
west and east are residential areas, amenity space and to the south there is a mixture
of woodland, semi-natural grassland and further residential areas.  Core paths are
located adjacent to the northern and southern boundaries. 
3. Description of Proposed Development
3.1. Planning permission is sought for a residential development consisting of a mix of 2 /
2.5 storey detached, semi-detached and terraced dwellings (50 five bedroom, 48 four
bedroom and 72 three bedroom).  The house designs are contemporary and external
finishes include red/buff facing brick and dark grey/red roof tiles. 
3.2. Access will be taken from Annabelle Road and Station Road via priority junctions.  An
internal layout of primary and secondary roads will be formed in a looped arrangement
around the perimeter connecting to an inner loop in the centre.  The footpath network
will provide links to the existing core paths to the north and south. 
3.3. Surface water will be treated by a SUDS basin in the southwest corner and thereafter
will drain into an upgraded culvert for conveyance to a nearby water course.  Foul
drainage will outfall to an existing sewer.  Extensive landscaping and amenity space
will be laid out throughout the development with a linear play area at a central amenity
focal point forming part of a green corridor through the site. 
4. Relevant Planning History
4.1. A Proposal of Application Notice P/21/0011/PAN for a residential development was
issued in August 2021 with no further consultation required. 
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
⧫ Ecological Appraisal
⧫ Pre-application consultation (PAC) Report
⧫ Site Investigation
⧫ Supporting Planning Statement
⧫ Transport Assessment
⧫ Remediation Method Statement
⧫ Design and Access Statement
⧫ Flood Risk Assessment
⧫ Drainage Statement
⧫ Energy Statement
⧫ Housing needs national release  
16

Page 17

6. Consultations
6.1. Mining Remediation Authority – No objection subject to conditions relating to
necessary remediation and confirmation that the site has been made safe and stable
prior to residential occupation.
Response: Noted and appropriate conditions could be attached to any decision notice. 
6.2. Roads Flood Risk Management – No Objections.
Response:  The site is not identified as falling within a flood risk area.  A Drainage and
Flood Risk Assessment and plans showing the proposed drainage system, including
SUDS basin and upgraded culvert, have been submitted.  If consent is granted,
conditions will be attached requiring the completion of self-certification and
independent check certificate appendices for drainage and flood risk as listed in the
Council's Developer Design Guidance (May 2020). 
6.3. Roads, Transportation and Fleet Services – No objection subject to conditions.
Response: Noted. 
6.4. Environmental Services – No objections, subject to a condition requiring a method
statement for piling. 
Response: Noted. Should planning permission be approved an appropriate condition
would be attached to any decision issued. 
6.5. Scottish Water – No objection.  However, the development may impact upon
infrastructure in the proximity of the development site.  The applicant must identify
potential conflicts with Scottish Water and contact their Asset Impact Team for an
appraisal of the proposals. 
Response: Surface water will be directed into a culvert which is separate from the foul
water sewer.  Drainage plans indicate development will not directly impact upon the
existing sewer pipe which crosses the site adjacent to the western boundary.  If
consent is granted conditions will be attached requiring confirmation from Scottish
Water that they will accept foul water discharge into their system and that the
development will not impact upon Scottish Water assets. 
6.6. Scottish Power Energy Networks – No objection, however, there are overhead lines
and cables within the vicinity of the site and they therefore reserve the right to protect
and/or deviate apparatus at the applicant’s expense. 
Response: If consent is granted an informative will be attached advising on the need
to cover the cost of diverting infrastructure. 
6.7. Community and Enterprise Resources - Play Provision Community Contributions –
The local playpark and nearest bookable football pitch at Ashgill would require
investment to accommodate the additional footfall from the development.  A
contribution per dwelling is requested to cover the upgrading costs.
Response: The applicant has agreed to making the requested financial contribution
and has asked that the requirement is formalised by a Section 75 agreement. 
6.8. Education Resources – No objection subject to appropriate contributions per dwelling
for secondary and nursery provision being sought. 
Response: The applicant has agreed to making the requested financial contribution
and has asked that the requirement is formalised by a Section 75 agreement. 
17

Page 18

6.9. Housing Services – Taking account of existing commitments in the Strategic Housing
Investment Plan (SHIP) and demand for housing in this area, preference for the above
site is for an affordable housing contribution to be provided in the form of a commuted
sum.
Response: The applicant has agreed to making the requested financial contribution
and has asked that the requirement is formalised by a Section 75 agreement. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement in the local
press, a total of 33 objections and 3 support letters have been received.  The issues
raised are summarised as follows:- 
Objections:-       
Amenity
⧫ Netherburn will be spoiled by an array of identical, crammed together, new
build houses that detract from the scenery of the area as well as the quiet,
peaceful life that many people moved into the area for.
⧫ Potential loss of daylight.
⧫ The development would impact on the tranquillity in the surrounding area and
detract from the character of Netherburn. 
Impact on Natural and Historic Environment
⧫ Impact upon birds and wildlife.
⧫ Destroy land required for wildlife.
⧫ Destroy a green space and wildlife habitats leading to a decline in the wildlife
population. 
Roads Related Matters
⧫ Bus service has been halved.
⧫ The road network is unable to support the volume of cars.
⧫ Roads are in a poor condition.
⧫ Increase in traffic represents a safety hazard.
⧫ Temporary traffic lights for construction would add to commuting times.
⧫ Increase in traffic will cause congestion and compromise emergency vehicles.
⧫ A reduction in available on street parking. 
Other Matters Raised
⧫ Unsustainable development on a greenfield site.
⧫ Air pollution and noise from construction.
⧫ Potential for subsidence.
⧫ There is only one shop and a small school, the hall is shutting and there is no
pub.
⧫ The play park is run down.
⧫ Impact upon water pressure.
⧫ The land is clearly on a flood plain. 
7.2. Other non-material planning comments were included in representations.  These
points relate to:- 
⧫ House values will be lowered.
⧫ Preliminary investigations have caused a rat problem.
⧫ The majority of villagers are unaware of the extent of the development.  
18

Page 19

7.3. Support:- 
⧫ Satisfied the developer is addressing issues of concern.
⧫ There is a wider need for new build homes in the local authority area. 
7.4. The above issues are considered in the assessment below.  These letters are
available on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the Development Plan, unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and
supports the planning and delivery of sustainable places, liveable places and
productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 3 – Biodiversity
 Policy 13 - Sustainable transport
 Policy 14 - Design, quality and place
 Policy 15 - Local living and 20 minute neighbourhoods
 Policy 16 - Quality homes
 Policy 22 - Flood risk and water management 
8.3. South Lanarkshire Local Development Plan 2
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change
 Policy 3 - General Urban Areas and Settlements
 Policy 5 - Development Management and Placemaking
 Policy 7 - Community Infrastructure Assessment
 Policy 12 - Affordable Housing
 Policy 15 - Travel and Transport
 Policy 16 - Water Environment and Flooding     
SLLDP2 Volume 2 Policies
 Policy DM1 New Development Design
 Policy SDCC2 Flood risk 
South Lanarkshire Council (SLC) Supporting Planning Guidance
The Community Infrastructure Assessment Supplementary Guidance (2022) 
9. Guidance
9.1. None applicable.  
19

Page 20

10. Assessment and Discussion
10.1. The determining issues in the consideration of this application are its compliance with
the National Planning Framework 4 (NPF4) and adopted South Lanarkshire Local
Development Plan 2 (SLLDP2). 
10.2. Principle of Development
In the adopted SLLDP2 proposal map the site is included within the settlement
boundary of Netherburn where Policy 3 – General Urban Areas and Settlements
advises that residential developments on appropriate sites will generally be
acceptable. 
10.3. The proposal satisfactorily complies with the aims of SLLDP2 Policy 3 and therefore it
accords with the spatial strategy of SLLDP2. 
10.4. Policy 16 of NPF4 relates to quality homes and seeks to encourage, promote and
facilitate the delivery of high quality homes, in the right location.  In relation to new
housing the policy states that development proposals for new homes on land not
allocated for housing in the local development plan will only be supported in limited
circumstances. Firstly, they must be supported by an agreed timescale for build out
and be consistent with the plan spatial strategy and other relevant policies including
local living and 20 minute neighbourhoods. Secondly, the proposal should meet one
of the following criteria 
 The delivery of sites allocated in the plan is happening earlier than identified in
the deliverable housing land pipeline
 The proposal is consistent with policy on rural homes
 The proposal is for smaller scale opportunities within an existing settlement
boundary
 The proposal is for the delivery of less than 50 affordable homes as part of a local
authority supported affordable housing plan 
10.5. The site is not allocated as housing land in SLLDP2. A detailed programme for the
carrying out of the development has been provided. In addition, the proposal accords
with the spatial strategy of SLLDP2 in that it involves development of a site within the
settlement boundary of Netherburn. As is noted below, it is also consistent with other
policies in both NPF4 and SLLDP2; in particular it meets the broader principles of local
living in terms of proximity to a primary school, play provision and greenspace,
convenience store/post office and public transport to Larkhall which provides a wide
range of services. 
10.6. Policy 16 also requires one of the criteria in the second part listed above to be met.
However, none of these are considered to be compliant. Nevertheless, the proposals
do accord with other relevant policies in NPF4 and with the spatial strategy of SLLDP2. 
The overall aim of Policy 16 is to encourage high quality, affordable homes which are
energy efficient and, in a location, where appropriate infrastructure is available which
is the case here. On balance, it is considered that the proposal is consistent with the
development plan and the principle of housing development on the site is acceptable.
The proposal represents a housing opportunity within the settlement boundary and the
layout will be enhanced by extensive amenity open space, tree planting and structured
landscaping. 
10.7. The drainage design will help alleviate localised flooding out with the site.  A financial
contribution will be made towards the provision of affordable housing, in the catchment
area, and the upgrading of a play area and football pitch.  Replacing vacant land at
the centre of the village with a sensitively designed residential development will result
20

Page 21

in environmental and amenity improvements.  Overall and on balance, this proposal
accords with general aspirations of the development plan. 
10.8. Climate Change 
Policies 1 and 2 of NPF4 and Policy 2 of the SLLDP2 relate to the climate crises and
identify that all development should seek to minimise and mitigate the effects of climate
change. 
10.9. The site is not identified on SEPA flooding maps as being at risk of flooding.  Proposed
SUDS and upgrading the capacity of a drainage culvert will effectively manage surface
water runoff, benefitting neighbouring properties and the drainage network. 
Conditions are proposed requiring electric vehicle charging points and the
implementation of a landscaping scheme which includes native tree and hedgerow
planting.  The proposal involves development of vacant land within a settlement where
there is a shop, primary school and public transport links.  Overall, the proposal would
not compromise the objectives of NPF4 Policies 1 and 2 and SLLDP2 Policy 2. 
10.10. Layout, Siting and Design
NPF4 Policy 14 Design Quality and Place and SLLDP2 Policy 5 Development
Management and Placemaking and Policy DM1 New Development Design seeks to
ensure well designed development that makes for successful places and considers
the impact on residential amenity. 
10.11. Informal open space and play areas, structural landscaping, links to the existing path
network and safe vehicle accesses into and out of the site will create a sense of place
with the benefits of a rural lifestyle.  A range of housing styles and sizes will be
provided, adaptable to the needs of families, couples and individuals.  Taking account
of orientation and position, the nearest dwellings will not be significantly affected by
overshadowing or loss of sunlight and privacy will not be compromised. 
10.12. Suitable parking can be provided and Roads, Transportation and Fleet Services in
their consultation response did not raise any public or traffic safety issues.  The site is
not in an identified air quality zone and there is sufficient capacity in the water supply
network.  Construction noise is covered by separate legislative controls. 
10.13. In recognition of historic mine workings, conditions will be attached to ensure the
ground is safe and stable for residential occupation.  There are no infrastructure
constraints.  The proposal will not impact upon landscape features, protected habitats,
or species.  The proposal is therefore satisfactory in terms of NFP4 Policy 14 and
SLLDP2 Policies 5 and DM1. 
10.14. Facilities within Netherburn include a primary school, convenience store/post office,
play park and playing fields and bus routes.  There is a wide range of services and
shops in Larkhall within a short cycle distance or via an hourly bus service.  There are
park and ride facilities next to Larkhall station.  Netherburn is like many small
settlements which rely on nearby larger centres for weekly shopping, employment,
health and social care facilities.  In view of the circumstances described, the proposal
does on balance accord with the aims and intent of Policy 15 Local Living of National
Planning Framework 4. 
10.15. Community Infrastructure Assessment
SLLDP2 Policy 7 Community Infrastructure Assessment states that where
development proposals would require capital or other works or facilities to enable them
to proceed, financial contributions towards their implementation will be required. 
Contributions will be sought in relation to affordable housing; roads and transportation;
21

Page 22

education provision; recreation; and council-owned community facilities where
respective providers assess that the additional demands placed on the services
necessitate financial contributions. 
10.16. SLLDP2 Policy 12 – Affordable housing advises that for sites of 20 or more units, 25%
of capacity should be allocated on site.  If on site provision is not viable then a
contribution towards affordable housing on alternative sites within the housing
catchment area will be sought. 
10.17. Community facilities require a contribution towards upgrading the neighbouring play
area and a bookable football pitch.  Education Resources have requested
contributions for nursery and secondary provision.  Housing Services advised that a
commuted sum for affordable housing elsewhere in the catchment area is appropriate
in this instance.  The applicant has agreed to these contributions which will be
addressed through a legal agreement.  In consideration, the terms of SLLDP2 Policies
7 and 12 can be complied with.  A Decision to Approve will be withheld until the
conclusion of a Section 75 agreement covering the relevant contributions. 
10.18. Natural and Historic Environment
NPF4 Policy 3 relates to biodiversity and details that all development shall include
appropriate measures to conserve, restore and enhance biodiversity. 
10.19. There are no protected species or habitats affected by the proposal. Habitats within 
the site are of limited ecological value.  Existing trees shall be retained.  The
landscaping scheme includes the creation of wetland and grassland meadows and
extensive native hedgerow, tree and bulb planting.  These features will facilitate wildlife
corridors, strengthening local nature networks.  Therefore, the proposal accords with
NPF4 Policy 3. 
10.20. Technical Matters (Flood Risk and Drainage) 
NPF4 Policy 22 Flood risk and water management details that proposals shall not
increase the risk of surface water to others or themselves.  Additionally, all rain and
surface water should be managed through SUDS and form part of the
proposed/existing, blue/green infrastructure and areas of impermeable surfaces are to
be minimised.  SLLDP2 Policy 16 ‘Water Environment and Flooding’ states that any
development proposal which will have an unacceptable impact on the water
environment will not be permitted.  SLLDP2 Policy SDCC2 ‘Flood Risk’ states that the
storage and conveyance capacity of the functional floodplain should be safeguarded.   
10.21. A SUDS basin and end of line swale will be installed in the southwest corner of the
application site.  A Flood Risk Assessment has concluded that there is no identified
flood risk affecting the proposed development.  The finished floor levels of the
dwellings would have a substantial freeboard.  On neighbouring land there is recorded
localised ponding at the junction of Netherburn Road/Station Road and along Crossing
Lane caused by flow impediment to a water course.  During heavy rainfall there could
be minor encroachment in the southwest corner of the site where the SUDS basin is
located.  Surface water drainage from the SUDs basin will connect into an upgraded
culvert (new 900mm pipe) providing conveyance capacity for present and proposed
development and the water catchment whilst alleviating localised flooding on
neighbouring land referred to above.  It is considered that the proposal complies with
the objectives and purpose of NPF4 Policy 22 and SLLDP2 Policy 16 and SDCC2. 
22

Page 23

10.22. Travel and Transport
NPF4 Policy 13 Sustainable Transport advises that for significant car generating
developments, a Transport Assessment and Travel Plan would be required.  Over
reliance on private car journeys will be discouraged.  SLLDP2 Policy 15 Travel and
Transport advises that active travel and the availability and/or provision of public
transport facilities, should be fundamental to the design and locational elements of
new development.  New development proposals should promote opportunities for
travel by sustainable travel modes in the following order of priority – walking, cycling,
public transport and car.  SLLDP2 Policy SDCC4 Sustainable Transport states
development should incorporate access to public transport routes and hubs and have
regard to the core path plans.  In addition, to address climate change and support the
use of electric vehicles, the Council will seek the inclusion of electric vehicle charging
points within new developments. 
10.23. A Transport Assessment has been submitted, and new priority junctions have been
designed to a satisfactory standard, adequate parking and cycle storage can be
provided and the road system includes traffic calming measures and safe crossings.
The layout will have segregated and safe links to local facilities via walking and cycling
networks.  The residential development is accessible by public transport and the
additional demand may result in the extension of the existing bus service to Larkhall. 
There are regular buses to Larkhall where a wide range of shops, services and
employment opportunities can be accessed.  There is also a park and ride facility, with
sufficient parking provision adjoining Larkhall Railway Station from where there are
half hourly trains to Hamilton, Glasgow and the wider conurbation.  In considering
these factors, the proposal accords with NPF4 Policy 13 and SLLDP2 Policies 15 and
SDCC4. 
10.24. Issues Raised by Objectors 
The majority of issues raised have been addressed throughout the assessment.  A
recurring theme relates to additional pressure upon public facilities such as medical
centres and dental practices.  Addressing such demand is the responsibility of the
service provider and falls out with the planning remit.  Notwithstanding, it should be
noted that the original application was for 230 units, and this has now been significantly
reduced to 170 units. 
10.25. Conclusion 
The proposal will result in the development of land within the settlement boundary of
Netherburn. It complies with the principles of local living.  There is a national housing
crisis and this residential development will help meet demand for housing in the
Larkhall area.  The village will benefit from access to good quality amenity open space. 
Extensive landscaping including native hedgerow and tree planting will ensure a net
gain to biodiversity.  The road network and neighbouring amenity will not be adversely
affected.  Installation of a new drainage culvert will alleviate localised flooding close to
the site.  Contributions from the developer for affordable housing and to upgrade
community/roads and educational facilities will be secured through a legal agreement.
Overall, it is considered that the proposal accords with the spatial strategy in the
development plan. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendations:- 
Grant detailed planning permission (subject to conditions listed and the
conclusion of a Section 75 agreement for financial contributions towards
educational provision, community facilities and affordable housing).  
23

Page 24

1) Planning Permission should not be issued until an appropriate obligation
under Section 75 of the Planning Act, and/or other appropriate agreement,
has been concluded between the Council, the applicant(s) and the site
owner(s).  This planning obligation should ensure that appropriate financial
contributions are made at appropriate times during the development towards
the following: 
- Financial contribution towards nursery and secondary school
provision, community facilities and affordable housing. 
In accordance with agreed procedure, should there be no significant
progress, on behalf of the applicant, towards the conclusion of the Planning
Obligation within 6 months of the date of the Committee, the proposed
development may be refused on the basis that, without the planning
control/developer contribution which would be secured by the Planning
Obligation, the proposed development would be unacceptable. 
If, however, this matter is being progressed satisfactorily the applicant will be
offered the opportunity to enter into a Processing Agreement, if this is not
already in place. This will set an alternative agreed timescale for the
conclusion of the Planning Obligation. 
All reasonable legal costs incurred by the Council in association with the
above Section 75 Obligation shall be borne by the applicant. 
Recommended Conditions:- 
01. The development to which this permission relates shall be begun no later 
than the expiration of three years beginning with the date of grant of this 
decision notice.  
Reason: To comply with Section 58(1) of the Town and Country Planning 
(Scotland) Act 1997 (as amended). 
02. That before any of the dwellinghouses situated on the site upon which a 
fence is to be erected is occupied, the fencing and walls, shown on the 
approved plans, shall be erected.  
Reason: To ensure the development is satisfactory in appearance and to 
maintain the visual quality of the area. 
03. That no trees within the application site shall be lopped, topped, pollarded 
or felled, and no shrubs or hedges shall be removed from the application 
site without the prior written consent of the Council as Planning Authority.  
Reason: In the interests of amenity and to ensure the protection and 
maintenance of the existing trees and other landscape features within the  
site. 
04. That the landscaping scheme relating to the development hereby approved 
shall be carried out simultaneously with the development, or each phase   
thereof.  
Reason: In the interests of the visual amenity of the area.  
24

Page 25

05. The recommendations and mitigation measures as listed in the Ecological
Appraisal Report (LUC, November 2022) shall be fully complied with.   
Reason: In the interests of biodiversity and wildlife. 
06. That before any work commences on the site, a scheme for the provision of 
play area(s) within the site shall be submitted to the Council as Planning 
Authority for written approval and shall include:- 
(a) details of the type and location of play equipment, seating and litter bins to be
situated within the play area(s); 
(b) details of the surface treatment of the play area, including the location and type
of safety surface to be installed; 
(c) details of the fences to be erected around the play area(s); and
(d) details of the phasing of these works unless agreed in writing by the Council as
Planning Authority. 
Reason: To ensure the provision of adequate play facilities within the site 
and in order to retain effective planning control. 
07. That prior to the completion or occupation of the last dwellinghouses within 
the development, all of the works required for the provision of equipped play 
area(s) included in the scheme approved under the terms of Condition 06, 
shall be completed, and thereafter, that area shall not be used for any 
purpose other than as an equipped play area.   
Reason: To ensure the provision of adequate play facilities within the site. 
08. That proposals for the maintenance of all areas of open space/play areas  
within the development shall be submitted to the Council as Planning 
Authority and no work on the site shall be commenced until the permission 
of the Council has been granted for these proposals or such other proposals  
as may be acceptable. 
Reason: In the interests of the visual amenity of the area. 
09. That no development shall commence until compliance of proposed drainage 
system with the principles of sustainable urban drainage systems and with 
the Council's Developer Design Guidance (May 2020) has been proven 
through the submission of the following signed appendices: C 'Sustainable 
Drainage Design Compliance certificate', D 'Sustainable Drainage Design 
Independent Check Certificate’ and E 'Confirmation of Future Maintenance  
of Sustainable Drainage Apparatus'. The development shall not be occupied 
until the surface drainage works have been completed in accordance with  
the approved details.        
Reason: To ensure that the disposal of surface water from the site is dealt  
with in a safe and sustainable manner, to return it to the natural water cycle  
with minimal adverse impact on people and the environment and to alleviate   
the potential for on-site and off-site flooding. 
10. Prior to the commencement of works on site, self-certification and 
independent check certificates appendices A and B (refer to the Council's 
developer design guidance May 2020) duly signed by the relevant party 
shall be submitted to the Council. 
25

Page 26

Reason: To ensure that works proposed are not at risk of flooding and will 
not increase the likelihood of flooding elsewhere. 
11. No development shall commence until:- 
Any remediation works and/or mitigation measures to address 
coal mining legacy, as may be necessary, have been implemented on site in full in
order to ensure that the site is safe and stable for the development proposed. 
The intrusive site investigations and remedial works shall be carried out in 
accordance with authoritative UK guidance. 
Reason: To ensure safe development and mitigate against ground instability on site
for the lifetime of the development. 
12. Prior to the occupation of the development, or it being brought into use, a 
signed statement or declaration prepared by a suitably competent 
person confirming that the site is, or has been made, safe and stable for the 
approved development shall be submitted to the Local Planning Authority 
for approval in writing.  This document shall confirm the methods and 
findings of the intrusive site investigations and the completion of any 
remedial works and/or mitigation necessary to address the risks posed by 
the recorded mine entry. 
Reason: To ensure that the risks associated from historical and/or current 
mining activity are minimised in the interests of public safety and ground 
stability for the future users of the proposed development and the 
neighbouring land. 
13. No piling works shall be carried out until a method statement has been 
submitted to and approved in writing by the Planning Authority.  This 
statement shall include an assessment of the impact of the piling on 
surrounding properties, taking into account the guidance contained in BS 
6472: 1992 'Evaluation of human exposure to vibration in buildings'.  It shall 
detail any procedures which are proposed to minimise the impact of noise 
and vibration on the occupants of surrounding properties.  This statement 
shall be prepared by a suitably qualified person, and the piling works shall 
thereafter be carried out in accordance with the approved method 
statement.    
Reason: To minimise noise, vibration and disturbance to neighbouring 
residents/occupants during blasting. 
14. That unless otherwise agreed in writing, Core Paths along the northern and 
southern boundaries of the site shall remain unimpeded at all times 
during construction works on site.  
Reason: In the interests of public access. 
15. Prior to the occupation of any dwelling within the development, the access roads and
footpaths linking the property to the existing public road shall be completed and
available for use. 
Reason: To ensure the provision of satisfactory vehicular and pedestrian access to
the development. 
26

Page 27

16. That, unless otherwise agreed with the Council as Planning Authority, before the
development hereby approved is completed or brought into use, a visibility splay of
2.4 metres by 43 metres measured from the road channel shall be provided on both
sides of the access on to Station Road. 
Reason: In the interests of traffic and public safety. 
17. That, unless otherwise agreed with the Council as Planning Authority, before the
development hereby approved is completed or brought into use, a visibility of 2.4
metres by 43 metres measured from the road channel shall be provided at the
emergency access on to Annabella Road. 
Reason: In the interests of traffic and public safety. 
18. That prior to commencing works on site the developer shall submit, for the written
approval of the Council, a Traffic Management Plan (TMP) which shall include
construction traffic access/egress arrangements and routes from suitable 'A' Class
roads.  The TMP should include information such as, but not limited to, construction
access routes to/from the site, wheel washing facilities, site car parking for
operatives/visitors and any temporary site access arrangements.  Once approved, all
works shall be undertaken in accordance with the TMP.  No construction traffic
access shall be permitted on routes not agreed with the Council as written through
the TMP. 
Reason: In the interest of road safety. 
12. Reason for Decision
12.1. The proposal will not adversely impact on residential amenity, biodiversity and road
safety, and makes optimum use of vacant land within the settlement of Netherburn,
helping to meet demand for housing. The proposal accords with Policies 1, 2, 3, 13,
14, 15, 16 and 22 of National Planning Framework 4 and Policies 2, 3, 5, 7, 12, 15,
16, DM1 and SDCC2 of the South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
Erection of housing development (170 homes) on undeveloped vacant land with landscaping,
play areas, drainage, road layouts, new accesses arrangements and associated
development. 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies.  
27

Page 28

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk  
28

Page 29

29

Page 30

Addendum Specifying Heads of Terms in relation to any relevant legal agreement. 
Planning
Application No.
P/24/0165
Development
Description
Erection of housing development (170 homes) on undeveloped
vacant land with landscaping, play areas, drainage, road layouts,
new accesses arrangements and associated development.
Site Address  Station Road
Netherburn
Larkhall
Applicant Avant Homes Scotland Ltd and Netherburn Green Ltd
Date of
Committee 
19 August 2025
Type of
obligation 
Section 75 
Obligations 
Resource Summary of Required Contributions
Community  Contributions towards a number of community assets in the area
including a nearby play area and a football pitch.
Education  Contributions towards education requirements at the following
locations:- 
 Secondary and nursery provision in the local area
Housing  Financial contribution towards the provision/improvement of
affordable housing within the surrounding area.
Roads  N/A 
30

Page 31

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources) 
Reference no:  P/24/0573
Proposal:  Redevelopment of existing farm buildings to provide farm workers
dwellings, new agricultural buildings, estate office and main
farmhouse with access, landscaping and associated infrastructure -
Application to discharge conditions 1, 2, 3, 4, 5, 6, 8, 9, 11, 12, 13, 15,
16, 17, 18, 19 and 20 of planning consent P/20/1047 
Site Address:  Auchentibber Farm, Auchentibber Road, Blantyre
Applicant:  AC Land Regeneration
Agent:  Page Park Architects
Ward:  18 - Hamilton West and Earnock
Application Type:  Approval of matters specified in conditions
Advert Date:  Hamilton Advertiser 25 July 2024   
Development Plan
Compliance: 
Yes 
Departures:  N/A 
Recommendation:  Approve discharge of conditions 
Legal Agreement:  No 
Direction to
Scottish Ministers 
No 
5
31

Page 32

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a Major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the Scheme of Delegation requires that all major
applications are determined by the Planning Committee. 
2. Site Description
2.1. The application site extends to approximately 11ha and is located to the west of
Hamilton.  The site is situated within the designated Greenbelt.   
2.2. The site comprises agricultural fields located to the north of Auchentibber Road and
includes the existing derelict buildings of Auchentibber Farm.  The perimeter of the
site is enclosed by established hedgerows and there is an area of woodland adjacent
to Auchentibber Farm Steading.  The topography of the site falls from the south to the
north.   
2.3. The existing access to the site is via Auchentibber Road. 
3. Description of Proposed Development
3.1. Planning permission in principle was granted by the Planning Committee on 7
September 2021 for ‘Redevelopment of existing farm buildings to provide farm workers
dwellings, new agricultural buildings, estate office and main farmhouse with access,
landscaping and associated infrastructure (Planning Permission in Principle)’
(P/20/1047). 
3.2. The current application for Approval of Matters Specified in Conditions seeks to
discharge conditions 1, 2, 3, 4, 5, 6, 8, 9, 11, 12, 13, 15, 16, 17, 18, 19 and 20 of
planning consent P/20/1047 to facilitate the re-occupation of the dilapidated farm
buildings and the erection of a new farmhouse, agricultural buildings and an estate
office.  The proposal seeks to create a traditional estate which reflects rural features
whilst simultaneously incorporating contemporary design elements. 
3.3.  Condition 1 of consent P/20/1047 specifies that all relevant matters such as layout,
siting, design, boundary treatments, landscaping and ground levels are submitted to
and approved by the Planning Authority.  Condition 2 relates to the site masterplan,
condition 3 requires the submission of SUDS details, condition 4 is associated with the
sewage system and condition 5 relates to traffic generation.  In addition, condition 6
requires details of the vehicular passing places, condition 8 relates to visibility splays,
condition 9 is associated with vehicular access and condition 11 requires the provision
of adequate parking spaces at the site.   
3.4. Conditions 12 and 13 of consent P/20/1047 relate to site investigation and remediation
works and condition 15 requires details of the phasing of the development.  Condition
16 relates to ecology at the site, condition 17 requires details of the structure of the
existing farm buildings and condition 18 is associated with tree survey work at the site.  
In addition, condition 19 restricts the heights of the proposed buildings on site and
condition 20 relates to extensions to the existing buildings. 
3.5. The information submitted relates to the discharge of the conditions attached to the
planning permission in principle (Ref. P/20/1047). 
4. Relevant Planning History
4.1. Planning permission in principle was granted by the Planning Committee on 7
September 2021 for ‘Redevelopment of existing farm buildings to provide farm workers
dwellings, new agricultural buildings, estate office and main farmhouse with access,
32

Page 33

landscaping and associated infrastructure (Planning Permission in Principle)’
(P/20/1047). 
5. Supporting Information 
5.1. In support of the planning application, the following has been submitted:- 
 Energy and Sustainability Statement 
 Site Investigation Report 
 Transport Statement 
 Dilapidation Survey 
 Design and Access Statement 
 Biodiversity Statement 
6. Consultations
6.1. Roads Development Management Team - No objection to the proposed development
and advise that a Section 56 road opening permit will be required. 
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, no letters
of representation have been received.   
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is the national spatial strategy for Scotland.  It
sets out spatial principles, regional priorities, national developments and national
planning policy.  NPF4 supports the planning and delivery of sustainable places,
liveable places and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation 
 Policy 3 - Biodiversity
 Policy 4 - Natural Places 
 Policy 8 - Green Belts
 Policy 9 - Brownfield, Vacant and Derelict Land and Empty Buildings
 Policy 13 - Sustainable Transport
 Policy 14 - Design, Quality and Place 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
33

Page 34

 Policy DM1 - New Development Design
 Policy GBRA4 - Conversion and Re-use of Existing Buildings
 Policy GBRA5 - Redevelopment of Previously Developed Land Containing
Buildings 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
This is an approval of matters specified by condition application to discharge
conditions 1, 2, 3, 4, 5, 6, 8, 9, 11, 12, 13, 15, 16, 17, 18, 19 and 20 which were
attached to Planning Permission P/20/1047.  These conditions cover a wide range of
matters relating to the development.   
10.2.  Following the determination of the previous Planning Permission in Principle
application, the acceptability of the re-use and redevelopment of the existing farm
buildings, the erection of a new farmhouse, estate office, agriculture buildings and
associated infrastructure has already been established. 
10.3. Matters Specified by Conditions
In relation to condition 1 (a-g) the applicant has submitted detailed drawings for each
of the elements of the proposal and this is supported by a Design and Access
Statement.  The proposals for the farm offices and farm sheds are functional and the
design reflects the rural character of the area.  The details for the restoration of the
existing derelict buildings on site illustrate that three dwellings will be created.  The
proposed restoration seeks to preserve the historic fabric of the buildings but
incorporates contemporary design elements and some modern materials.  The design
of the new farmhouse is high quality, contemporary and utilises modern materials. 
Following assessment, in the context of the topography of the site and the submitted
landscaping drawings, in this instance the proposed details submitted for condition 1
are considered to be acceptable and do not raise any significant policy issues in the
context of NPF4 and the LDP. 
10.4. With regards to condition 2, an updated masterplan has been submitted and is
considered acceptable. 
10.5. The submitted details relating to the surface water drainage and sewage system at the
site, required under the terms of conditions 3 and condition 4, are considered
acceptable. 
10.6. A Transport Assessment and detailed drawings have been submitted and accepted,
in consultation with Roads, Transportation and Fleet Services, in relation to the
matters detailed within conditions 5, 6, 8, 9 and 11.   
10.7. A site investigation report has been submitted in relation to the matters specified in
conditions 12 and 13 and is accepted.   
10.8. A phasing plan has been submitted which satisfies the terms of condition 15. 
10.9. In relation to the natural environment, the information provided in relation to the
protection of species habitats on the site and the existing trees at the site is accepted
in relation to conditions 16 and 18. 
34

Page 35

10.10. With regards to condition 17, the submitted Dilapidation Survey of the existing farm
buildings on site has been accepted.  In relation to the design of the restoration of the
existing farm buildings, the submitted drawings illustrate that the proposal accords with
the details of conditions 19 and 20.  In addition, the proposed new farmhouse has
been designed to accord with the matters detailed in condition 19 relating to storey
height.   
10.11. Conclusion 
In conclusion, the principle of the redevelopment of existing farm buildings to provide
farm workers dwellings, new agricultural buildings, an estate office and main
farmhouse with access, landscaping and associated infrastructure on this site is
supported by the existing Planning Permission in Principle.  The design, layout and
general impact of the development is considered to be acceptable within the Greenbelt
and the proposal raises no significant environmental or infrastructure issues.  The
detailed drawings and supporting information have addressed conditions 1, 2, 3, 4, 5,
6, 8, 9, 11, 12, 13, 15, 16, 17, 18, 19 and 20 of planning permission in principle
P/20/1047 and it is considered that the approval of matters specified in these
conditions is appropriate. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant approval of matters specified by conditions 1, 2, 3, 4, 5, 6, 8, 9, 11, 12, 13,
15, 16, 17, 18, 19 and 20 of planning consent P/20/1047. 
12. Reason for Decision
12.1 The applicant has submitted the information necessary to discharge conditions 1, 2,
3, 4, 5, 6, 8, 9, 11, 12, 13, 15, 16, 17, 18, 19 and 20 of planning permission in principle
P/20/1047. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/0573 | Redevelopment of existing farm buildings to provide farm workers dwellings, new
agricultural buildings, estate office and main farmhouse with access, landscaping and
associated infrastructure - Application to discharge conditions 1, 2, 3, 4, 5, 6, 8, 9, 11, 12, 13,
15, 16, 17, 18, 19 and 20 of consent P/20/1047 | Auchentibber Farm Auchentibber Road
Blantyre 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources) 
Reference no:  P/24/1137
Proposal:  Redevelopment of existing farm buildings to provide farm workers
dwellings, new agricultural buildings, estate office and main
farmhouse with access, landscaping and associated infrastructure -
application to discharge conditions 7, 10 and 14 of planning consent
P/20/1047 
Site Address:  Auchentibber Farm, Auchentibber Road, Blantyre
Applicant:  AC Land Regeneration
Agent:  Page Park Architects
Ward:  18 - Hamilton West and Earnock
Application Type:  Approval of matters specified in conditions
Advert Date:  Hamilton Advertiser 17 July 2025   
Development Plan
Compliance: 
Yes 
Departures:  N/A 
Recommendation:  Approve discharge of conditions and attach continuing conditions
Legal Agreement:  No 
Direction to
Scottish Ministers 
No 
6
37

Page 38

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a Major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the Scheme of Delegation requires that all major
applications are determined by the Planning Committee. 
2. Site Description
2.1. The application site extends to approximately 11ha and is located to the west of
Hamilton.  The site is situated within the designated green belt.   
2.2. The site comprises agricultural fields located to the north of Auchentibber Road and
includes the existing derelict buildings of Auchentibber Farm.  The perimeter of the
site is enclosed by established hedgerows and there is an area of woodland adjacent
to Auchentibber Farm Steading.  The topography of the site falls from the south to the
north.   
2.3. The existing access to the site is via Auchentibber Road. 
3. Description of Proposed Development
3.1. Planning permission in principle was granted by the Planning Committee on 7
September 2021 for ‘Redevelopment of existing farm buildings to provide farm workers
dwellings, new agricultural buildings, estate office and main farmhouse with access,
landscaping and associated infrastructure (Planning Permission in Principle)’
(P/20/1047). 
3.2. The current application for Matters Specified in Conditions seeks to discharge
conditions 7, 10 and 14 of consent P/20/1047 to facilitate the re-occupation of the
dilapidated farm buildings and the erection of a new farmhouse, agricultural buildings
and an estate office.  The proposal seeks to create a traditional estate which reflects
rural features whilst simultaneously incorporating contemporary design elements. 
3.3.  Condition 7 of consent P/20/1047 requires the submission of details of the parking,
turning and cleaning facilities for vehicles during the construction phase of the
development.  Condition 10 relates to the submission of a dilapidation survey of
Auchentibber Road.  In addition, condition 14 relates to the implementation of an
archaeological watching brief.   
3.4. The information submitted relates to the discharge of the conditions attached to the
planning permission in principle (Ref. P/20/1047). 
4. Relevant Planning History
4.1. Planning permission in principle was granted by the Planning Committee on 7
September 2021 for ‘Redevelopment of existing farm buildings to provide farm workers
dwellings, new agricultural buildings, estate office and main farmhouse with access,
landscaping and associated infrastructure (Planning Permission in Principle)’
(P/20/1047). 
5. Supporting Information 
5.1. In support of the planning application, the following has been submitted:- 
 Archaeological Mitigation Works Written Scheme of Investigation
 Dilapidation Survey   
38

Page 39

6. Consultations
6.1. Roads Development Management Team - No objection to the proposed development. 
Response: Noted. 
6.2. West of Scotland Archaeology Service – The submitted method statement for the
watching brief is acceptable.  However, they have advised that the on-site work still
requires to be completed and the post-excavation analysis of recovered material and
the publication of results requires to be undertaken between the developer and the
archaeological contractor. 
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, there have
been no letters of representation received.   
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation 
 Policy 3 - Biodiversity
 Policy 4 - Natural Places 
 Policy 8 - Green Belts
 Policy 9 - Brownfield, Vacant and Derelict Land and Empty Buildings
 Policy 13 - Sustainable Transport
 Policy 14 - Design, Quality and Place 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy DM1 - New Development Design
 Policy GBRA4 - Conversion and Re-use of Existing Buildings
 Policy GBRA5 - Redevelopment of Previously Developed Land Containing
Buildings  
39

Page 40

9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
This is an approval of matters specified by condition application to discharge
conditions 7, 10 and 14 which were attached to planning consent P/20/1047.  These
conditions cover a range of matters relating to the development.   
10.2.  Following the determination of the previous Planning Permission in Principle
application, the acceptability of the re-use and redevelopment of the existing farm
buildings, a new farmhouse, estate office, agriculture buildings and associated
infrastructure and landscaping has already been established. 
10.3. Matters Specified by Conditions
In relation to condition 7, the applicant has submitted a drawing which illustrates the
details of the proposed site compound and construction vehicle cleaning facilities. 
Following consultation with Roads, Transportation and Fleet Services, these details
are considered acceptable and the terms of condition 7 have been satisfied.   
10.4. The submitted Auchentibber Farm Dilapidation Survey has been reviewed and
accepted in relation to the first element of condition 10.  This condition also requires
that, following the completion of all construction activities on site, any defects and
repair works require to be undertaken by the applicant.  Therefore, it is recommended
that a new condition is attached relating to any future repair works to the road which
shall remain for the duration of the development. 
10.5. With regards to condition 14, the submitted Archaeological Mitigation Works Written
Scheme of Investigation has been accepted.  However, it is recommended that a new
condition is attached relating to the archaeological on-site works. 
10.6. Conclusion 
In conclusion, the principle of the redevelopment of existing farm buildings to provide
farm workers dwellings, new agricultural buildings, an estate office and main
farmhouse with access, landscaping and associated infrastructure on this site is
supported by the existing Planning Permission in Principle.  The design, layout and
general impact of the development is considered to be acceptable within the green
belt and the proposal raises no significant environmental or infrastructure issues.  The
drawings and supporting information have addressed conditions 7, 10 and 14 of
planning permission in principle P/20/1047 and it is considered that the approval of
matters specified in this condition is appropriate. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant approval of matters specified by conditions 7, 10 and 14 of consent
P/20/1047 and attach the following conditions:- 
01. Following the construction phase of the development and before any buildings
are occupied on site, any repair works required to Auchentibber Road shall be
completed. 
Reason: In the interests of road safety.  
40

Page 41

02. That the developer shall secure the implementation of an archaeological
watching brief, to be carried out by an archaeological organisation acceptable
to the Council as Planning Authority, during all ground disturbance.  The
retained archaeological organisation shall be afforded access at all reasonable
times and allowed to record and recover items of interest and finds. 
Reason: In order to safeguard any archaeological items of interest or finds. 
12. Reason for Decision
12.1. The applicant has submitted the information necessary to fully discharge condition 7
and partially discharge conditions 10 and 14 of planning permission in principle
P/20/1047. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/1137 | Redevelopment of existing farm buildings to provide farm workers dwellings, new
agricultural buildings, estate office and main farmhouse with access, landscaping and associated
infrastructure - Application to discharge conditions 7, 10 and 14 of consent P/20/1047 | Auchentibber
Farm Auchentibber Road Blantyre G72 0TW 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
41

Page 42

42

Page 43

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0681
Proposal:  Extension to Cloburn Quarry to allow for continued extraction and
processing of hard rock
Site Address:  Cloburn Quarry, Thankerton, Lanark, ML11 8SR
Applicant:  Cloburn Quarry Company Limited
Agent:  Dalgleish Associates – Willie Booth 
Ward:  03 – Clydesdale East
Application Type:  Full Planning Permission
Advert Date  Edinburgh Gazette – 12 July 2024
Lanark Gazette – 10 July 2024 
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to Conditions, Section 75 Agreement and Section 96
Agreement
Legal Agreement:  The Committee should note that the planning permission, if granted,
should not be issued until such times as the following matters have
been concluded: A Section 75 Agreement to secure:- 
1. Financial contributions towards the South Lanarkshire Rural
Communities Trust Fund; and
2. A guarantee to cover all site restoration and aftercare liabilities 
A Section 96 Agreement to ensure the suitable upkeep and repair of
roads within the vicinity of the site. 
The applicant will be responsible for meeting the Council’s reasonably
incurred legal expenses in respect of the legal agreements. 
Direction to
Scottish Ministers 
Not Required.  
7
43

Page 44

1. Reason for Report
1.1. This application is presented to Committee as it constitutes a major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the approved South Lanarkshire Scheme of
Delegation requires that all major applications are determined by the Planning
Committee. 
2. Site Location and Description
2.1. The application site extends to some 15ha in area and lies adjacent to the northern
and western boundaries of the current operational area associated with Cloburn
Quarry.  The existing quarry lies some 5km to the east-southeast of Lanark, with the
village of Pettinain lying some 750m to the north-east of the quarry.  The closest
residential properties to the existing quarry lie within the southernmost part of
Pettinain, some 500m to the north, together with a number of properties on Glentisset
Road, sitting between 450m and 550m to the northwest side of the site, and on the
A73 opposite the access to the site. 
2.2. An area of coniferous woodland lying on the north facing slope of Westraw Hill (sitting
to the immediate north of the excavation area), was felled in 2021 as part of the
ongoing Woodland Management Plan covering the wider area, with the site of the
extension proposed under this application comprising part of this felled woodland area. 
3. Description of Proposed Development
3.1. Under this application, full planning permission is sought for an extension to the
existing operational quarry at Cloburn Quarry.  The proposed extraction operation
would be carried out over 7 phases, covering a period of 42 years together with a
further period of 2 years to cover restoration works.  It is estimated that some 42 million
tonnes of blue and red felsite will be extracted over this period. 
3.2. During phases 1 and 2, excavation operations would extend the existing development
area to its northern, north-western and western sides.  The development of the
western end of Cairngryffe Hill will remove the existing high quarry faces and will allow
the creation of a new quarry access to ramp down to a level of 275m AOD.  Phases 3
to 7 progressively develop the quarry downwards within the existing ‘bowl’ to a
maximum depth of 182m AOD. 
3.3. From phase 3 onwards, all quarry processing waste will be deposited within an existing
void at Swaites Hill within the current operational site.  By the end of phase 7 the
combination of quarry dust and processing waste will allow this former excavation area
to be reinstated close to its original ground level.  The proposed restoration scheme is
designed to restore prominent areas of the quarry at the earliest opportunity, with the
scheme itself largely replicating the approved restoration scheme for the existing
quarry. 
3.4. The quarry currently operates on a 24-hour basis throughout the week.  The main
operations comprise the transportation of material from the site between 7am and 7pm
and processing which is carried out between 6.30am and 5pm.  Blasting is undertaken
between 10am and 4pm on Monday to Friday.  Only other non-audible activity is
carried out outwith these times.  The quarry currently generates an average of 271
daily vehicle movements Monday to Friday based on a current average output of 1m
tonnes a year.  The applicants are planning to increase this output to 1.2m tonnes
which would equate to 355 daily traffic movements, equivalent to an additional 15 two-
way HGV movements per hour.  Approximately 80% of these trips would go
northwards towards Ravenstruther Rail terminal via Hyndford Bridge. 
44

Page 45

4. Relevant Planning History
4.1. Cloburn Quarry has been in operation since 1896.  The site originally operated as two
separate quarries, Cairngryffe and Cloburn, and since both of these quarries were
acquired by Cloburn Quarry Company Limited in 1987 they have been worked as a
single unit. 
4.2. The quarry currently operates under planning permission reference CL/09/0086,
issued by the Council on 10 July 2013.  Amongst other things this planning permission
requires that the extraction ceases by 10 October 2033, with the restoration of the site
being completed within a period of two years thereafter. 
4.3. Planning application reference CL/14/0140 (the Swaites Hill extension) was granted
by the Council on 4 November 2014.  This planning permission requires the extraction
works to cease by June 2031 with the restoration being completed within a period of
2 years thereafter. 
4.4. Planning application reference CL/16/0175 was issued by the Council on 1 July 2016
for an extension to the “dust storage area”. 
4.5. In addition to this application three further separate applications have been submitted
under section 42 of the Town and Country (Planning) Scotland Act 1997.  They seek
to amend conditions attached to the three planning permissions described above in
order to reflect the position if this application were granted. 
5. Supporting Information 
5.1. The planning application submission is supported by the following reports/documents:- 
 Environmental Impact Assessment Report
 Planning Statement 
6. Consultations
6.1. Roads Development Management No objection to the quarry being extended based
on potential increases to annual tonnages and trip distribution as set out in the
submission subject to conditions relating to the provision and maintenance of
sightlines onto the A73; the sheeting of laden lorries leaving Cloburn Quarry; the
removal of mud or other materials deposited on the public highway by vehicles
entering or leaving the site; all vehicles entering or leaving the site shall use the access
road to and from the A73; and the procurement and installation of two new traffic signal
programme boards (proms) at the Hyndford Bridge signalised junction.  In addition,
the existing Section 96 Agreement covering extraordinary wear and tear of the public
road at the site entrance shall be continued to cover the extended life of the quarry.
Response: Noted.  Appropriate conditions will be applied to any consent that is
granted to address these issues.  In addition, if the application is approved the decision
notice shall be withheld until a replacement Section 96 agreement is in place. 
6.2. Environmental Services No objection to the proposed development subject to the
imposition of appropriate conditions relating to noise emissions, dust management,
blasting and hours of operation. 
Response: Appropriate conditions will be applied to any consent that is granted to
address these issues. 
45

Page 46

6.3. NatureScot have raised no objection to the proposed development as there would be
no impact on national or internationally designated sites of nature conservation
importance.  They also advise that while additional landscape and visual impacts are
likely to arise these effects do not raise issues of national interest.  They have no
objections subject to appropriate conditions being attached to any planning permission
to control the timing of operations to ensure the suitable protection of birds nesting
within the area.
Response: Appropriate conditions will be applied to any consent that is granted to
address these issues 
6.4. SEPA Intially submitted a holding objection based upon lack of information relating to
the potential impact of the proposed development on an existing private water supply. 
Following discussions between SEPA and the applicant’s agent, this issue has now
been resolved to the satisfaction of SEPA.  In addition, they require a condition to be
attached to any consent requiring confirmation of the amount of peat extracted and its
management if needed.
Response: Appropriate conditions will be applied to any consent that is granted to
address these issues 
6.5. West of Scotland Archaeological Service  No objection subject to the imposition
of a condition dealing with pre-commencement site investigation.
Response: An appropriate condition will be applied, to any consent that is granted to
address this issue. 
6.6. Scottish Gas Networks Raise no objection to the proposed development. 
Response: Position noted. 
6.7. Transport Scotland Were consulted as the proposal is an Environmental Impact
Assessment (EIA) application, however, they raise no objection to the proposed
development. 
Response: Position noted. 
6.8. Historic and Environment Scotland (HES) Advise they are content with the EIA
report submitted with the application and are satisfied issues they raised at the scoping
stage have been addressed sufficiently to mitigate any concerns. 
Response: Position noted. 
6.9. Forestry Scotland Raise no objection to the proposed development as the proposal
does not impact on any forestry interest. 
Response: Position noted. 
6.10. Carmichael Community Council
Advise they object to the application for the reasons set out in the objection submitted
by the Cairngryffe Hill Action Group.
Response: The points raised by the Cairngryffe Hill Action Group are reported upon
in section 10 of this report. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
68 letters objecting to the proposed development have been received.  62 letters
supporting the proposed development have also been received. 
46

Page 47

7.2. The issues raised within the submitted letters of objection are as follows:- 
 Loss of visual amenity and unacceptable levels of visual intrusion
 Adverse impacts associated with noise associated with the operation of the
quarry
 Adverse impacts associated with dust emitted during the extraction operations.
 Light pollution
 Noise impacts associated with blasting
 Adverse landscape impacts including permanent damage to the qualities of the
Special Landscape Area in which the site is located both during the extraction
and following the creation of the lochan as part of the restoration proposals
 Adverse impacts upon local road network
 No need for the development has been demonstrated 
7.3. The issues raised within the letters of objection are considered within the assessment
section of this report.  These letters are available for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and
supports the planning and delivery of sustainable places, liveable places, and
productive places. 
National Planning Framework 4 Policies 
• Policy 1 – Tackling the climate and nature crisis
• Policy 2 – Climate mitigation and adaptation
• Policy 3 – Biodiversity
• Policy 4 – Natural places
• Policy 5 – Soils
• Policy 29 – Rural development
• Policy 33 – Minerals 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Policies 
 Policy 1 – Spatial Strategy
 Policy 2 – Climate Change
 Policy 4 – Green Belt and Rural Area
 Policy 5 – Development Management and Placemaking
 Policy 13 – Green Network and Greenspace
 Policy 14 – Natural and Historic Environment
 Policy 15 – Travel and Transport
 Policy 16 – Water Environment and Flooding
 Policy 19 – Minerals Development
 Policy GBRA2 – Business Proposals within Green Belt and Rural Area
47

Page 48

 MIN1 – Settlements
 MIN2 – Cumulative Impact
 MIN3 – Restoration
 MIN5 – Controlling Impacts from Extraction Sites
 MIN6 – Community Benefit 
9. Guidance
9.1. Planning Advice Note 50 – Controlling the environmental effects of surface mineral
workings and its associated Annex A are of relevance to the assessment of this
application. 
10. Assessment and Discussion
10.1. Introduction 
The applicant seeks detailed planning permission for an extension to the existing
quarrying operations at Cloburn Quarry.  The determining issues in the consideration
of this application are its compliance with the development plan, which consists of
National Planning Framework 4 and the adopted South Lanarkshire Local
Development Plan 2. 
10.2. Principle of Development 
The application under consideration proposes an extension to Cloburn Quarry
involving the continued extraction of hard rock within the confines of the existing
quarry.  Quarrying activity is long established at the site and therefore the principle of
this form of operation at this location is acceptable.  Nevertheless, the overall scale of
the proposals must be assessed against current development plan policies. 
10.3. The site is identified as lying within the designated Rural Area in the adopted South
Lanarkshire Local Development Plan 2 (SLLDP2).  Policy 4 Green Belt and Rural
Areas states that, amongst other things, both the green belt and rural areas function
primarily for agriculture, forestry, recreation and other uses appropriate to the
countryside. 
10.4. Policy GBRA2 Business Proposals within Green Belt and Rural Area sets out a range
of types of development that are considered appropriate within such areas including
mineral extraction proposals which accord with Policy 19 Minerals of the SLLDP2.  As
a matter of broad principle, the proposed continued use of the application site for
mineral extraction purposes would be in accord with the terms of Policy 4 and Policy
GBRA2, with the overall acceptability resting on the extent to which the proposed
development can be justified against the terms of Policy 19.    
10.5. Policy 19 provides specific policy guidance relative to minerals developments and
advises, amongst other things, that in assessing applications for mineral extraction,
the Council will balance the economic and other benefits from the development against
any potential impacts on the environment and local communities. 
10.6. Due to the high-quality nature of the felsite material quarried at Cloburn, the quarry is
one of a very small number of suppliers that produces railway ballast and is a key
strategic supplier for the entire Network Rail network.  The quarry also exports material
to other national and international markets which sets it apart from most quarries which
generally produce material which is used within a distance of 30 miles or so from the
quarry.  It is therefore acknowledged that there are wider economic benefits
associated with the continued operation of this strategically important source of
quarried material.  It would also help retain the approximately 30 direct jobs as well as
other indirect employment.  As a result, it is considered that the proposed development
can be justified against the economic benefit aspect of Policy 19. 
48

Page 49

10.7. As noted above, Policy 19 also requires that, in assessing applications for mineral
developments, regard should be had to the potential impacts of the proposed
development on the environment and local communities.  The application is supported
by a full Environmental Impact Assessment Report which has been considered by
statutory consultees.  A summary of the impact of the proposals on relevant matters
is now set out. 
10.8. Landscape and Visual Impact
A Landscape and Visual Impact Assessment (LVIA) was submitted with the
application.  The stated purpose of the LVIA was to assess the likely impacts that the
proposed development would have upon the receiving landscape and local
communities.  The LVIA was subject of review by external consultants who confirmed
that the assessment has been carried out using a methodology which broadly accords
with current best practice.  There are several areas of the report that the consultant
highlights in relation to the assessment of sensitivity, the magnitude of change and
significance and the cumulative impact.  Where differences are identified, this was
assessed as being largely due to variances in the assessment approach taken and
did not undermine the overall findings of the assessment. 
10.9. The proposed development lies in a transitional landscape of farmland and foothills
set between a loop of the River Clyde and the prominent Tinto Hills to the south.  It
lies within the Undulating Farmland and Hills Landscape Character Type (LCT), south
and east of the Plateau Farmland LCT and north of Rounded Landmark Hills LCT. 
This area lies within the Upper Clyde Valley and Tinto Special Landscape Area (SLA). 
The special qualities of the SLA include the meandering river Clyde set in a broad
valley enclosed by the Southern Uplands and Tinto Hill as well as the frequent visitors
to the area due to the major transport routes passing through and popular hillwalking
destinations including Tinto Hill.  While these would be visually affected to some
extent, the existence of the existing quarry within the SLA must be considered in the
baseline, reducing the potential for adverse effects. 
10.10. The main landscape and visual effects of the proposed development relate to the site
and its close surroundings including the host LCT and closest properties and Pettinain. 
The proposed development would have slight impacts on the LCT but importantly
would not introduce any new features into the landscape.  The principal effects are
likely to occur in the earlier years of operation, during phases 1 and 2, where changes
to the landform of Cairngryffe and Westraw Hills would be greatest and operations
required to take down the landform would periodically be visible. 
10.11. The changes would be widely visible and seen over a period of several years. 
However they would take place in the context of the existing operational quarry, which
is already visible from all but the closest locations on lower ground to the west and
south of the site.  It is these locations that would experience the greatest level of
change and significant adverse effects although they would be temporary in nature. 
10.12. The western ridge of the current working area runs at a height of 310/311m above
ordnance datum (AOD) and would be reduced to a height ranging between 285/290m
AOD following the extraction works. There would be limited opportunity for mitigation
in these areas during the period in which the landforms are reduced.  However, in later
phases the quarry workings will be screened by the retained landform and proposed
planting.  The effects in later phases, and following full restoration, are therefore likely
to be neutral or increasingly beneficial by comparison with the existing baseline of the
quarry. 
49

Page 50

10.13. More distant receptors will see the upper southeast side of the quarry where it is
intended to carry out planting to the visible retained landforms.  The proposed
development is a limited extension to an existing quarry that is already quite widely
visible.  The restoration proposals will gradually result in a beneficial effect on the
landscape and visual receptors by comparison with the current operational quarry.  In
terms of cumulative effect, the closest operational quarries are two sand and gravel
quarries over 3km to the west.  They are low-lying and, due to the separation and lack
of intervisibility, cumulative effects would be limited. 
10.14. Given these various factors it is considered that the LVIA provides an acceptable
assessment of the landscape and visual impacts of the proposed development, with
the overall conclusion of this consideration being that these impacts are acceptable. 
The assessment indicates that all potentially negative impacts will reduce on
completion of the operations associated with the impact.  The progressive restoration
will mean that, for many of the viewpoints, the residual and long term and permanent
effects will be positive when compared to the baseline condition and currently
permitted restoration scheme. 
10.15. Noise
The noise assessment measured the existing noise levels at the residential properties
which lie closest to the site with an assessment then being made of the sound power
output from the types of plant and equipment to be used in connection with the
quarrying operations.  Using this information predictions were then made of the likely
operational noise levels which would be experienced at the properties in question. 
10.16. The assessment indicates that the proposed development can be undertaken within
the noise criteria guidance set out within PAN 50, Annex A and that accordingly the
proposed development, subject to the proposed noise control measures along with
effective day to day management, can be undertaken without giving rise to any
significant noise related impacts. 
10.17. The document has been reviewed by Environmental Services and they have offered
no objection to the proposed development based on noise related considerations
subject to a number of conditions to control these aspects.  Given these
considerations, it is concluded that the noise impacts associated with the proposed
development fall within acceptable limits and will not give rise to any significant
adverse impacts. 
10.18. Air Quality/Dust
An assessment of the potential impact of dust generation in respect of identified dust
sensitive receptors was carried out in accordance with the guidance set out by the
Institute of Air Quality Management.  This assessment considered the method of
working, dust control measures to be employed as part of the proposed development,
the potential duration of dust generating operations, meteorological conditions and the
location of the sensitive receptors.  It was informed by on-site dust monitoring for both
nuisance and respirable dust, with the results confirming that the current site
operations are not having a significant impact upon the surrounding area. 
10.19. The document has been reviewed by Environmental Services and they have offered
no objection to the proposed development based on noise related considerations
subject to the imposition of conditions to control these aspects. As such, it is concluded
that the potential dust impacts associated with the proposed development fall within
acceptable limits and will not give rise to any significant adverse impacts. 
50

Page 51

10.20. Lighting
The information provided in support of the application indicates that, as the quarry
operates on a 24-hour basis, lighting will be required for operations taking place during
the hours of darkness.  During such periods, lighting will be restricted to that which is
necessary for health and safety reasons and will be directed downward and inwards
towards specific operational areas. 
10.21. This information indicates that the main potential source of light impact is associated
with the processing of the extracted materials and the existing ready-mix and asphalt
plants.  As a result of the recent forestry felling, the upper sections of the plant have
become visible from longer distance views from the north.  The assessment indicates
that as the plant in question is located no less than 800m from the nearest residential
property, whilst there may be potential for an element of “sky glow” and that a small
portion of the plant may be visible from the wider area, there would be no light intrusion
or glare because of the illumination beyond the site boundary. 
10.22. Given these various considerations, the impact of lighting on the amenity of nearby
residential properties and communities, and on the character of the wider area has
been assessed as being slight/negligible.  In addition, Environmental Services have
offered no objection to the proposed development in relation to potential light pollution. 
10.23. Blasting
In common with the existing quarry operation, the extraction of material from the
proposed extension will involve the use of blasting and as a consequence of this, a
blast vibration impact assessment has been undertaken in support of the application. 
Vibration predictions have been made for the existing residential properties which lie
closet to the site, with these predictions being based upon the blast design proposed
for the development of the site and the data collected from previous blast monitoring
at the quarry.  This assessment concludes that proposed extension can operate within
accepted vibration criteria and without giving rise to any significant impacts on local
residents subject to the implementation of the proposed blast design and the proposed
monitoring programme.  Environmental Services have confirmed they are satisfied
with these recommendations. 
10.24. Transportation
Following detailed consideration of the information submitted with the application and
in light of post submission discussions with the applicants agent, the Council’s Roads,
Transportation and Fleet Services has advised that, subject to the imposition of a
number of conditions, the traffic generated by the proposed development will not give
rise to any adverse impacts upon the local road network and that accordingly, they
have offered no objection to the proposed development. 
10.25. Impact on Local Communities
In addition to the above matters, Policy MIN1 Settlements in SLLDP2 states that
minerals developments will only be permitted where impacts on settlements and
communities have been reduced to acceptable levels.  This generally requires a buffer
zone to be established.  In the case where blasting is involved, the buffer zone is
required to be at least 500m from a settlement boundary.  A reduced distance may be
acceptable depending on the individual circumstances of the proposal. 
10.26. In this particular case the proposals involve an extension to an existing quarry.  The
horizontal extent of the area that will be excavated is limited with much of the new
activity associated with excavating to deeper levels in the existing bowl.  While the site
is closer to the southern extremity of Pettinain and individual properties it is considered
there would be a negligible additional impact on their amenity.  In addition, conditions
51

Page 52

to control and manage activity (including limiting blasting to a short period during the
day) would be attached to any consent granted. 
10.27. Since adoption of SLLDP2, National Planning Framework 4 has become part of the
Development Plan for South Lanarkshire.  Policy 33 of NPF4 deals specifically with
minerals development.  It contains a range of criteria that must be met in order for
proposals to be supported, including ensuring that there are no adverse impacts on
the natural and historic environment, the landscape and visual impacts, nearby
settlements and homes; show acceptable levels of noise, dust and vibration; minimise
transport impacts; and include schemes for a high standard of restoration and
aftercare. 
10.28. These various considerations have been assessed above within the context of Policy
19 of SLLDP2 and, for the reasons set out, it is considered that the proposed
development is acceptable in principle and raises no issues which would outweigh the
acceptability of the proposed development when assessed against the requirements
of NPF4 Policy 33. 
10.29. NPF4 Policy 1 Tackling the climate and nature crisis requires that, when considering
all development proposals, significant weight should be given to the global climate and
nature crisis.  The requirement to address the climate crisis is expanded upon within
Policy 2 Climate mitigation and adaptation which requires, amongst other things, that
development proposals should be sited and designed to minimise, as far as possible,
lifecycle greenhouse gas emissions. 
10.30. In assessing each of these policy matters it is considered that as the proposed
development represents an extension of an existing operational quarry the proposals
themselves will not result in a net increase in impacts associated with the site as it
stands at present and will not result in an increase in any greenhouse gas emissions
associated with the operation of the site (which are restricted to emissions associated
with the operation of plant and machinery on the site). 
10.31. With regards to the nature crisis, it is noted that the supporting evidence lodged as
part of the overall application submission shows clearly that the site is of low ecological
and biodiversity value.  As an integral part of the proposed restoration works, new
habitats will be created within the site which will result in an over increase in the
biodiversity value of the site and on this basis, in the longer term, the proposals will
further the aims of addressing the nature crisis. 
10.32. Accordingly, it is considered that the proposed development accords with the
requirements of policies 1 and 2 of NPF4.  Following the same assessment process,
it is also considered that the proposed development accords with the requirements of
policy 2 Climate Change of SLLDP2. 
10.33. In overall terms, it is appropriate for developments of the scale as that proposed under
this application to be assessed also against the Spatial Strategy set out within the
LDP2.  Policy 1 Spatial Strategy advises that the spatial strategy of LDP2 will
encourage sustainable economic growth and regeneration, move towards a low
carbon economy, protect the natural and historic environment and mitigate against the
impacts of climate change. 
10.34. To secure this stated purpose, the policy sets out a number of objectives which the
spatial strategy will achieve.  Of the 12 objectives which are listed, only objectives 9
and 12 are considered to be of relevance to the assessment of the application.
Objective 9 states that the spatial strategy will “protect and enhance the natural and
52

Page 53

historic environment.  The impact of the proposed development on both the natural
and historic environment is considered in detail with the EIAR which has been
submitted in support of the application, with the conclusion of the EIAR being that the
proposed development will have no adverse impacts upon these considerations.  This
assessment is backed up by the terms of the consultation responses which have been
received from HES and NatureScot, neither of who have offered an objection to the
proposed development.  On balance, therefore, it is considered that the proposed
development would not conflict with this aspect of the spatial strategy. 
10.35. Objective 12 states that the spatial strategy will “continue to ensure an adequate and
steady supply of minerals and maintain a minimum ten-year land bank of aggregates”.
To this end, the proposed development in general terms will assist in ensuring that the
minimum ten-year land bank is maintained.  Going beyond this simple consideration,
due to the specific nature of the material, which is quarried at Cloburn, approval for
the continuation of the quarrying activities at this site beyond the scope of the extant
permission is considered to be of significant benefit to the wider construction industry
through the supply of material that cannot readily be sourced from alternative sources. 
Consequently, proposed development accords with this aspect of the spatial strategy. 
10.36. Conclusions
The proposed development, comprises an extension to, and the progressive
restoration of, an existing long standing active quarry and will not give rise to any
significant adverse impacts on the landscape character, visual and residential amenity
of the area and road network and that through the terms of the proposed restoration
scheme, the opportunity exists to significantly enhance the overall biodiversity value
of the site by way of the creation of a number of new habitat types. 
10.37. Having regard to the provisions of Sections 25 and 37(2) of the Town and Country
Planning (Scotland) Act 1997, it is considered that the proposed development is in
accordance with the relevant provisions of the development plan and no relevant
material considerations have been identified which would outweigh the acceptability
of the proposals in terms of the development plan. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Planning Permission subject to the following:- 
1. A Section 75 Legal Agreement covering the following matters; 
 A restoration guarantee bond to ensure the satisfactory restoration of the site
should the applicant fail to or otherwise be unable to fulfil this task. 
 Financial contributions towards the South Lanarkshire Rural Communities Trust
Fund; 
2. A Section 96 Agreement to ensure the suitable upkeep and repair of roads
within the vicinity of the site, and 
53

Page 54

3. The following conditions:- 
01        Unless otherwise directed by conditions attached to this consent, this decision relates
to the Environmental Impact Assessment Report, dated May 2024 for the Proposed
Extension to Cloburn Quarry, Lanark and to those associated technical documents
which form part of the application submission. 
Reason: In order to properly specify the development for which planning
permission is being granted. 
02       That all extraction operations on the site shall be discontinued not later than
42 years from the date of commencement of the development hereby
approved and that, within a period of 2 years from this discontinuance date,
the entire site shall be restored in accordance with the approved restoration
scheme to the satisfaction of the Council as Planning Authority. 
Reason: To ensure that the site is restored in a satisfactory manner within the
time frame permitted under this planning permission. 
03       That before any work starts on the extension to Cloburn Quarry hereby
approved, a detailed scheme to prevent materials, mud and other debris
being carried outwith the site and onto the public road shall be submitted for
the prior written approval of the Council as Planning Authority. The existing
bituminous surface within the site shall be retained and maintained to the
satisfaction of the Council. The approved scheme shall be in operation at all
times during the development hereby approved. 
Reason: In the interests of road traffic safety. 
04       That a wheel washing facility shall be in operation during the operation of the
development hereby approved and all vehicles leaving the site shall pass
through the wheel washing facility before entering the public highway. 
Reason: To prevent mud and other deleterious material from being carried
onto the public highway. 
05       All vehicles entering or leaving the site shall use the access road to and from
the A73.  No vehicles shall be permitted to use any other means of access to
the site unless in an emergency or if otherwise agreed in writing by the
Council as Planning Authority. 
Reason: In the interests of road traffic safety and to protect the amenity of the
surrounding area. 
06       That the site shall operate in accordance with the following conditions in order
to comply with Annex A of Planning Advice Note, PAN 50, "Controlling the
Environmental Effects of Surface Mineral Workings”. 
1. Between 07.00hrs and 19.00hrs, the nominal noise limit attributable to
site operations as measured free field at all noise sensitive properties, in
the vicinity of the site, shall not exceed an LAeq,1hr of 55dB. 
54

Page 55

2. Between 19.00hrs and 07.00hrs the nominal noise limit attributable to site
operations as measured free field at all noise sensitive properties, in the
vicinity of the site, shall not exceed an LAeq,1hr of 42dB. 
3. The quarry shall operate on a 24 hour a day basis throughout the week
with the following provisions- 
a) General dispatch shall be restricted to between 06.00 hours and 20.00   
hours.             
b) Dispatch of asphalt may be undertaken on a 24 hour a day basis. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
07       Notwithstanding the terms of Condition 6 above, during baffle mound
construction and soil stripping operations the nominal daytime noise limit from
site operations, during the hours of operation shall be no more than 70dB
LAeq over any one hour period for a maximum of 8 weeks per year, or for
such other time period to be agreed in writing with the Council as Planning
Authority. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
08       Efficient silencers shall be fitted to, used and maintained in accordance with
manufacturer's instructions on all vehicles, plant and machinery used on the
site.  With the exception of maintenance, no machinery shall be operated with
the covers open or removed. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
09       Reversing alarms used on plant and vehicles shall be either non-audible,
ambient related, or low tone devices. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
10       That within 3 months of the date of this decision notice, a detailed scheme of
site noise monitoring and mitigation shall be submitted to and be approved in
writing by the Council as Planning Authority and thereafter the site operator
shall abide by the terms of the approved monitoring and mitigation scheme
unless otherwise agreed in writing with the Council as Planning Authority. 
This monitoring and mitigation scheme shall provide details of:- 
 Location of noise monitoring equipment.
 Mitigation measures.
 Monitoring frequency.
 Details of equipment to be used and experience of monitoring staff.
 A programme of implementation. 
 Frequency of reporting the results to the Council as Planning Authority. 
 The process and steps to be taken in the event of a complaint regarding
noise. 
55

Page 56

Reason: To allow the Council as Planning Authority to consider these matters
in detail. 
11       That no blasting shall take place on site outwith the hours of 10.00 hours to
16.00 hours Monday to Friday. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
12       That within 3 months of the date of this decision notice, a detailed scheme for
the monitoring and mitigation of blasting within the site shall be submitted to
and be approved in writing by the Council as Planning Authority and
thereafter the site operator shall abide by the terms of the approved
monitoring and mitigation scheme unless otherwise agreed in writing with the
Council as Planning Authority 
This scheme shall provide details of:- 
 Location of monitoring equipment
 Monitoring frequency
 Details of equipment to be used and experience of monitoring staff
 A programme of implementation
 The Local Authority shall be notified in advance of scheduled blasting and
shall receive details (In the form of a trace) of trigger events above a PPV
of 0.5mms-1 
Reason: To allow the Council as Planning Authority to consider these matters
in detail. 
13       That ground vibration and peak linear over pressure as a result of blasting
operations, shall not exceed a peak particle velocity of 6mm per second in
95% of each block of 20 consecutively numbered blasts and no individual
blast shall exceed a peak particle velocity of 12mms per second as measured
at any residential premises in the vicinity of the site. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
14       Within the constraints of safe quarrying practices, blasting shall be avoided
under weather conditions which are likely to direct or focus the blast air
overpressure towards neighbouring noise sensitive properties. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
15       That when required, water bowsers and sprayers, whether fixed or mobile,
shall be used to minimise the emission of dust from the site.  If the prevention
of dust nuisance by these means is not possible, then the movement of soils,
vehicles, etc. shall temporarily cease until such time as the weather
conditions improve. 
Reason: In the interests of the amenity of the surrounding area and nearby
residential properties. 
56

Page 57

16       That within 3 months of the date of this decision notice, a detailed scheme of
dust and air quality monitoring and mitigation shall be submitted to and be
approved in writing by the Council as Planning Authority and thereafter the
site operator shall abide by the terms of the approved monitoring and
mitigation scheme unless otherwise agreed in writing with the Council as
Planning Authority. 
The dust and air quality monitoring and mitigation scheme shall provide
details of:- 
 A dust management plan;
 Mitigation measures;
 Location of monitoring points;
 Monitoring frequency;
 Details of equipment to be used and experience of monitoring staff;
 A programme of implementation;
 Frequency of reporting the results to the Council as Planning Authority;
and
 The process and steps to be taken in the event of a complaint regarding
dust. 
Reason: To allow the Council as Planning Authority to consider these matters
in detail. 
17         That any stripping, stacking and replacement of topsoil shall be carried out when
conditions are dry enough to avoid unnecessary compaction of the soils at any
stage.   
Reason: To preserve the quality of the soils. 
18         That the movement of plant, vehicles and machinery on the site shall be carried out
in such a manner as to avoid, as far as practicably possible, the crossing of
undisturbed, reclaimed or restored land. 
Reason: In the interests of the general amenity of the site. 
19         No operations involving soil lifting/replacement shall take place between the
months of October to March inclusive except with the prior written approval of the
Council as Planning Authority. 
Reason: To preserve the quality of the soils. 
20        That no development hereby approved shall take place within the application site
until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which
has been submitted by the applicant, agreed by the West of Scotland Archaeology
Service and approved in writing by the Council as Planning Authority.  Thereafter
the developer shall ensure that the programme of archaeological works is fully
implemented and that all recording and recovery of archaeological resources within
the development site is undertaken to the satisfaction of the Council as Planning
Authority, in consultation with the West of Scotland Archaeological Service. 
Reason: To ensure that provision is made to address areas of archaeological
interest. 
57

Page 58

21         That before the carrying out of any works within the area affected by peat, details of
the amount of peat to be extracted and how it will be managed will be submitted for
the approval of the Council as Planning Authority. 
Reason: To ensure that sufficient soils and peat are retained for on-site restoration
purposes. 
22         That unless otherwise approved in writing with the Council as planning Authority, at
the completion of the final restoration of the site the remaining access roads and
hard standings are to be removed and the ground restored in accordance with the
approved registration scheme. 
Reason: To ensure the satisfactory restoration of the site. 
23         That within one year from the date of the commencement of the development
hereby authorised (and on that date every year thereafter), the operator shall
submit to the Council as Planning Authority, an annual progress plan detailing the
following:- 
 The extent of extraction operations undertaken that year;
 Areas prepared for extraction;
 The extent of backfilling and restoration carried out;
 The extent of landscaping, nature conservation works that have been carried
out;
 An up to date survey of the site;
 Current and anticipated production figures;
 Remaining reserves;
 Compliance with statutory permission; and
 Site complaint logs and actions taken.     
Reason: To ensure the Planning Authority is informed at regular intervals of the
progress of the site, to assist with site monitoring and to help inform development
plan preparation. 
24         That in the event of the extraction operations on site ceasing for a period of 12
months or more, the Council as Planning Authority shall deem operations to have
permanently ceased and shall require the immediate implementation of the
approved restoration scheme, unless agreed otherwise in writing with the Council
as Planning Authority. 
Reason: To allow the Council to retain effective control over the development. 
25        That unless otherwise approved in writing by the Council as Planning Authority, no
material shall be imported to or deposited at the site, other than that which is
required in connection with the production of asphalt and concrete. 
Reason: To allow the Council to retain effective control over the development. 
26         That prior, but not more than 6 months, to the commencement of the development
hereby approved, updated protected species surveys shall be submitted to and
approved by the Council as Planning Authority, in consultation with NatureScot. 
Reason: To ensure that provision is made to safeguard the ecological interest in the
site. 
58

Page 59

27         All containers being used to store liquids (which have the potential to cause
pollution) within the site shall be clearly labelled to show their contents and be
located in a bund which shall be no less than 110% of the capacity of the largest
container within it. 
All bunds shall conform to the following standards:- 
 The walls and base shall be impermeable;
 The base shall drain to a sump;
 All valves, taps, pipes, and every part of each container shall be located
within the area served by the bund when not in use; 
 Vent pipes shall be directed down into the bund;
 No part of the bund shall be within 10m of any watercourse; and
 Any accumulation of any matter within the bund shall be removed as
necessary to maintain its effectiveness. 
Reason: To ensure the safe storage on potentially polluting liquids on the site. 
28        That the applicant shall be responsible for costs incurred by the Council as Roads
Authority for the procurement and installation of two new traffic signal programme
boards (proms) for introduction of revised traffic signal timings at Hyndford Bridge
signalised junction. 
Reason: In the interests of road safety. 
29     That an access visibility splay of 2.4 metres by 215 metres in both directions be
maintained onto the A73 and that everything exceeding 1.05 metres in height above
the road channel level shall be removed from the visibility envelope and thereafter
nothing exceeding 1.05 metres in height shall be planted, placed or erected within
the visibility splay. 
Reason: In the interests of road safety. 
12 Reason for Decision
12.1 The proposed development, which proposes an extension to Cloburn Quarry and the
restoration thereof, is considered to be acceptable subject to the imposition of the suite
of conditions, as detailed in Section 11 above.  The proposals are therefore considered
to accord with the terms of Policies 1, 2, 3, 4, 5, 29 and 33 of NPF4 and also with
Policies 1, 2, 4, 5, 13, 14, 15, 16, 19, MIN1, MIN2, MIN3, MIN5 and MIN6 of the
adopted SLLDP2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online: 
P/24/0681 | Proposed extension to Cloburn Quarry to allow for continued excavation and
processing of hard rock for 42 years and thereafter a 2 year reinstatement period. | Cloburn
Quarry A73 From Symington A72 To Hyndford Bridge Thankerton Biggar ML11 8SR  
59

Page 60

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
60

Page 61

61

Page 62

62

Page 63

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/0856
Proposal:  Erection of dwellinghouse for retiring farm worker
Site Address:  Land 66M Northeast of Crown House Farm
Struther Highway
Sandford
Strathaven
ML10 6PT 
Applicant:  Mr Hamish McCall
Agent:  Planning Services UK
Ward:  05 Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News - 12 March 2025
Development Plan
Compliance:
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
8
63

Page 64

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee under Section
4B(17)(e) of the adopted Scheme of Delegation 2024 as the Head of Planning and
Regulatory Services, in consultation with the Chair of the Planning Committee, has
determined it raises policy issues meriting consideration by the Planning Committee. 
2. Site Description
2.1. The site, which has an area of approximately 0.2 hectares, is located on land forming
part of Avonbank Farm, located to the south of Strathaven and to the west of Sandford. 
The site is located at the eastern edge of the farm holding, significantly removed from
the main farm buildings.  The site is directly bounded on all sides by undeveloped
greenfield land.  Further to the west of the site is a residential property, known as
Crown House Farm. 
3. Description of Proposed Development
3.1. The proposal is for the erection of a single storey dwellinghouse.  The proposed
dwellinghouse would comprise two bedrooms, in addition to a study, living room and
kitchen accommodation.  Dedicated car parking and garden ground would be provided
externally to the dwellinghouse.  Access to the site would be taken from an existing
gated field access, via an existing private access.  The dwellinghouse would be for the
use of a retiring farm worker, who would sell the remainder of the landholding and farm
buildings at Avonbank Farm and retire to the proposed dwellinghouse. 
4. Relevant Planning History
4.1 There is no relevant planning history for the site. 
5. Supporting Information 
5.1.  The applicants have submitted a planning statement, a design and access statement
and a further statement in support of their proposals. 
6. Consultations
6.1. Roads, Transportation and Fleet Services – offered no objection to the proposed
development, subject to conditions relating to access and road safety measures.
Response: Noted. 
6.2. Environmental Services – offered no objection to the proposed development.
Response: Noted. 
6.3. Scottish Water – offered no objection to the proposed development.
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, two letters
of objection have been received.  The issues raised are summarised as follows:- 
 Overdevelopment 
 Loss of privacy 
The above issues have been considered as part of the assessment below.  These
letters are available for inspection on the planning portal.  Other non-material issues
were also raised, however, these are not planning related and do not form part of the
assessment of the proposal.  
64

Page 65

8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and
supports the planning and delivery of sustainable places, liveable places, and
productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 14 - Design, quality and place
 Policy 17 - Rural homes 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking 
SLLDP2 Volume 2 Policies 
 Policy DM1 - New Development Design
 Policy GBRA1 - Rural Design and Development
 Policy GBRA10 - Accommodation Associated with an Existing or Proposed Rural
Business 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
The main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development, its layout, siting and design,
and an assessment of technical matters.  The policies contained within National
Planning Framework 4 (NPF4) and the South Lanarkshire Local Development Plan 2
(SLLDP2) are the main consideration in this case, together with an assessment of any
other material planning considerations. 
10.2. Principle of Development
In terms of the principle of the development, the site is located within the rural area as
designated by Policy 4 – Green Belt and Rural Area of SLLDP2.  In addition, Policy 17
– Rural homes of NPF4 also provides policy with regard to residential development
proposals in rural locations. 
10.3. Policy 17 of NPF4 seeks to encourage, promote and facilitate the delivery of more high
quality, affordable and sustainable rural homes in the right locations.  The policy
requires all proposed new homes to be suitably scaled, sited and designed to be in
keeping with the character of the area.  With specific regard to the provision of
dwellings for retiring farm workers, the policy permits the provision of such houses only
where the house would relate to the retirement succession of a viable farm holding. 
65

Page 66

10.4. The dwellinghouse is proposed to be located on a self-contained site that is remote
from the farm buildings at Avonbank Farm.  It is advised in the submitted supporting
information that the dwellinghouse would be utilised by a retiring farmer at Avonbank
Farm.  However, further clarification has been provided that the farm would be sold off
separately to the proposed dwellinghouse.  The proposed dwelling would, therefore,
not relate to the retirement succession of the farm holding as required by Policy 17. 
10.5. The location of the site is remote from the farm steading and the proposed use of the
dwelling is a separate entity to Avonbank Farm.  Given this, it would not form part of
the farm holding or the retirement succession of the farm.  As it has not been
appropriately justified as a development that requires it to be located in the
countryside, the proposed development would fail to comply with the provisions of
Policy 17 of NPF4 and Policy 4 of SLLDP2 with regard to siting considerations. 
10.6. Layout, Siting and Design 
In terms of siting and design considerations both Policy 17 of NPF4 and Policy 4 of
SLLDP2 seek to resist isolated, sporadic development that has not been appropriately
justified in terms of being development that would require to be sited within countryside
locations.  Policy 14 of NPF4 and Policies 5, DM1, GBRA1 and GBRA10 of SLLDP2
provide further policy with regard to general development design and rural
development. 
10.7. Climate Change
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of climate
change.  It is noted that the development is proposed to be located in an isolated
location and that appropriate justification has not been provided for the siting of the
development at this location.  The proposed development is therefore considered to
be an unsuitable proposal in an unsustainable location and fails to comply with the
provisions of Policies 1 and 2 of NPF4 or Policy 2 of SLLDP2. 
10.8. Conclusion
Following a detailed assessment of the proposals, it is concluded that the principle of
this proposed residential development within the rural area has not been justified in
this case, as the proposed dwellinghouse would be sited in a remote location from the
farm steading and would not form part of the retirement succession of a farm holding. 
The proposal fails to comply with the relevant policies of the development plan, and it
is recommended that planning consent is refused. 
11. Recommendation and Reasons
11.1.  The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 17 - Rural Homes of National Planning
Framework 4 (2023) as it has not been satisfactorily demonstrated that the proposals
comply with the criteria contained within the policy relating to the provision of new
dwellinghouses in rural areas and, as such, fail to encourage, promote and facilitate
compact urban growth and use the land around our towns and cities sustainably.  
66

Page 67

02. The proposal would be contrary to Policy 4 - Green Belt and Rural Areas and of the
South Lanarkshire Local Development Plan 2 (2021) as it relates to isolated, sporadic
development in the countryside and it has not been appropriately justified in terms of
being development which would require to be located within the rural area. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/0856 | Erection of dwellinghouse for retiring farm worker | Land 66M Northeast Of
Crown House Farm Struther Highway Sandford Strathaven ML10 6PT 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
67

Page 68

68

Page 69

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1236
Proposal:  Construction and Operation of Renewable Energy Development,
comprising 22 Wind Turbines, Solar Array, Battery Energy Storage
System and associated infrastructure (Consultation from Scottish
Ministers under Section 36 of the Electricity Act 1989) 
Site Address:  Land either side of M74 immediately to the northwest of Abington
Service Station and approximately 4.5km southwest of Douglas
Applicant:  M74 West Limited
Agent:  Ramboll UK Limited
Ward:  3 – Clydesdale East
Application Type:  Electricity notification Section 36 application
Advert Type:  None Required
Development Plan
Compliance:
No 
Departures:  N/A
Recommendation:  That the Scottish Government Energy Consents Unit is informed that,
for the reasons stated, South Lanarkshire Council object to the granting
of consent under Section 36 of the Electricity Act 1989 
Legal Agreement:  In the event that the application is granted the Scottish Government is
also advised that any approval issued in respect of this application
should be subject to the conclusion of a legal agreement(s) covering
Community Contribution Payments 
Direction to
Scottish Ministers 
N/A  
9
69

Page 70

1. Reason for Report
1.1. This report relates to a consultation on an application that has been made to the
Scottish Government under Section 36 of the Electricity Act 1989 and which in the
opinion of the Head of Planning and Regulatory Servies raises issues that have policy
implications that are worthy of consideration by the Planning Committee. 
2. Site Description
2.1 The site extends to some 1,275ha in area and is located immediately to the northwest
of Abington and approximately 4.5km to the southeast of Douglas.  It currently
comprises open moorland, improved and semi-improved grassland, an area of forestry
and is intersected by the M74 motorway and B7078 local road.  The A702 and
Abington services form the southern boundary of the site. 
2.2  Parts of the site have been subject to extensive sand and gravel quarrying, with
quarrying activity currently being concluded at Thirstone Quarry, located to the north
of the B7078 and M74 in the central and northern parts of the site, and previous
quarrying activity identified by Ordnance Survey mapping in the northern and western
parts of the site.  In addition, there are a number of utility and telecommunication links
that cross the site, including two high pressure gas pipelines, Scottish Water pipelines
and fixed telecommunication links operated by Vodafone Ltd. 
2.3 The wider landscape features numerous existing wind farms within 15-20 km,
including large developments such as Clyde and its extension to the east, and
Andershaw and Middlemuir occupying the western part of the moorland area where
the area of the site identified for positioning wind turbines is located. 
2.4 There are two residential properties within the red line boundary: Thirstone Cottage
and the Strand. These properties are financially involved in the Proposed
Development, and it is intended that both properties will be used as part of the
Proposed Development and will not continue in residential use.  In addition, there are
a number of residential properties near the site, including Blackburn Farm, Netherton
Farm, Crawfordjohn Mill Farm, Craighead Farm and Duneaton House, as well as
residential settlements at further distance concentrated particularly within the villages
of Abington, Crawfordjohn, Roberton and Douglas. 
2.5 The landscape is typical of the wider location, with the site being in the northern portion
of the Southern Upland Hills, with Tinto Hill lying approximately 8km to the north of the
site.  The Duneaton Water, a tributary of the River Clyde, passes through the eastern
section of the site and forms part of the northern and southern boundaries of the site. 
3. Description of Proposed Development
3.1 An application is made to the Scottish Government under Section 36 of the Electricity
Act 1989 for the construction and operation of a renewable energy development
including:- 
 Up to 22 wind turbines with a combined generation capacity of greater than 50
MW either side of the M74
 A battery energy storage system (BESS) with approximately 50 MW capacity.
measuring approximately 124m x 160m and located within Thirstone Quarry
 Solar Array consisting of approximately 3,065 solar panels laid out in
approximately 37m long rows with a spacing of approximately 9m between each
row.  The approximate area that would be covered by the solar array would be
160 ha.  The panels would be mounted at approximately 0.8m from the ground
rising to 2.86m and be tilted approximately 25 degrees from horizontal in a south
facing direction 
70

Page 71

3.2 Associated components of the proposal include:- 
 permanent turbine foundations and associated permanent and temporary crane
hardstanding at each turbine location
 a main entrance for use during construction and operations, at the current
entrance to Thirstone Quarry
 two site entrances to the south of the B7078 and one site entrance off the B740
directly south of the B7078, which have been designed to accommodate
abnormal indivisible loads (AIL) required for turbine component delivery
 a further site entrance from the M74 motorway to the northern part of the site
only to allow delivery of AIL required for turbine component delivery
 five further site entrances to the solar array area, four from the B7078 (two to
the north and two to the south) and one from the A702 immediately north of
Abington services
 a series of new on-site access tracks with associated watercourse crossings
and turning heads
 underground cable arrays within the site connecting the turbines and solar
panels to the on-site substation
 substation compound and control building
 repurposing of the house at Thirstone Cottage as a site office
 repurposing of the property at The Strand as a strategic spares store
 four temporary construction compounds and laydown areas 
3.3 The expected operational life of the Proposed Development is 40 years from the date
of commissioning. 
3.4 The scale of the proposed development, in terms of its generating capacity, is such
that it requires to be consented through the Electricity Act, with the Scottish
Government acting as the Consenting Authority.  As such, the Council acts as a
consultee and is not the Consenting Authority. 
4. Relevant Planning History
4.1. None. 
5. Supporting Information 
5.1. The applicants have submitted several supporting documents with the application as
set out below:- 
 Environmental Impact Assessment Report
 Design Statement
 Economic and Community Impact Assessment
 Community Benefits Statement 
6. Consultations
6.1 The Council is a consultee in the Section 36 application process and therefore
consultation by the Council is limited to Council services.  A summary of the wider
consultation responses received by the Scottish Government is also included below,
as these may be relevant to the view of the Council.  
71

Page 72

6.2. Environmental Services – offered no objection subject to conditions relating to noise,
shadow flicker and construction activities. 
Response: Noted.  Appropriate conditions form part of the recommended consultation
response to the Scottish Government. 
6.3. Roads, Transportation and Fleet Services (Development Management) – offered
no objection to the proposed development subject to the repositioning of Turbines T17,
T20 and T22 and subject also to several conditions regarding access and ice throw.
Response: Noted, and the required amendments and conditions will be included
within the recommended consultation response to the Scottish Government. 
6.4. West of Scotland Archaeology Service (WoSAS) – at the time of writing, a response
to this consultation request has not been received.  It is, however, noted that Historic
Environment Scotland has provided detailed comments on the application. 
6.5 Relevant consultations undertaken by the Energy Consents Unit (ECU) are listed and
summarised as follows:- 
6.6  BT Radio Network Protection – No objection to the proposed development. 
6.7 NATS Safeguarding – Objects to the proposed development due to the potential
impact on radar facilities. 
6.8 Scottish Water – No objection to the proposed development. 
6.9 Scottish Forestry – No objection to the proposed development. 
6.10 Ministry of Defence (MOD) – Objects to the proposed development based on impacts
on low flight training routes and on the Eskdalemuir seismology recording facility. 
6.11 SP Energy Networks (SPEN) – Objects to the proposed development based upon
the impact on and maintenance of their transmission network.  The resolution of these
matters is an issue for the applicant to address with the ECU, in consultation with
SPEN. 
6.12 Transport Scotland – No objection to the proposed development. 
6.13 Glasgow Airport – No objection to the proposed development. 
6.14 Historic Environment Scotland – Object to the proposed development based upon
the impact of the proposed development upon 4 Scheduled Ancient Monuments. 
6.15 SEPA – No objection to the proposed development. 
6.16 RSPB – Objects to the proposed development based upon impact on breeding waders
(especially curlew and lapwing).  The resolution of these matters is an issue for the
applicant to address with the ECU, in consultation with RSPB. 
6.17 NatureScot – NatureScot object to the proposal but have suggested a series of
conditions requiring mitigation which may address their objection. 
6.18  Civil Aviation Authority (CAA) – No objection to the proposed development. 
6.19 Shell UK - No objection to the proposed development subject to conditions. 
72

Page 73

7. Representations
7.1. The Energy Consents Unit are responsible for carrying out statutory neighbour
notification and publicity on the application.  Any representations are sent directly to
the ECU for consideration in their assessment of the Section 36 application. 
8. Development Plan
8.1 The application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989. A planning application is required to be determined in
accordance with the Development Plan, unless material considerations indicate
otherwise. However, for Section 36 applications the Development Plan has the status
of a material consideration which is required to be taken into account by the Scottish
Ministers in the determination of the application. 
8.2 The Council has been consulted in its role as the Planning Authority for the area in
which the application site is located and therefore the Council’s response to the
consultation request is required to be informed by an assessment against the
provisions of the Development Plan. Other material considerations pertinent to the
application may also be considered. The Development Plan comprises the South
Lanarkshire Local Development Plan 2 adopted in April 2021 and National Planning
Framework 4 adopted by the Scottish Government in February 2023. 
8.3. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and
supports the planning and delivery of sustainable places, liveable places and
productive places.  
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 3 - Biodiversity
 Policy 4 - Natural places
 Policy 5 - Soils
 Policy 6 - Forestry, woodland and trees
 Policy 7 - Historic assets and places
 Policy 11 - Energy
 Policy 22 - Flood risk and water management
 Policy 29 - Rural development 
8.4. South Lanarkshire Local Development Plan 2 (2021)
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):-  
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Environment
 Policy 15 - Travel and Transport
 Policy 16 - Water Environment and Flooding
 Policy 18 - Renewable Energy  
73

Page 74

9. Guidance
9.1. - South Lanarkshire Council (SLC) Supporting Planning Guidance Renewable Energy
(January 2021) 
- Landscape Capacity Study for Wind Energy (2019 as amended) 
10. Assessment and Discussion
10.1. Assessment 
10.2. The proposed development comprises a renewable energy park that includes two
forms of generation and an associated battery storage system within a single location. 
As such, the proposed development is a form of renewable energy generation and
supports the general principles set out in NPF4 Policy 1 and 2, in addition to Policy 1
– Spatial Strategy and Policy 2 – Climate Change of the South Lanarkshire Local
Development Plan 2. 
10.3. Policy 11 – Energy of NPF4 as a general principle encourages and promotes all forms
of renewable energy development.  The policy also sets out a range of criteria that
proposals should be assessed against to ensure the impact of the project design and
mitigation is addressed.  In terms of the matters that are within the remit of the Council
as a consultee on the application, these include:- 
 impacts on communities and individual dwellings, including, residential
amenity, visual impact, noise and shadow flicker 
 significant landscape and visual impacts 
 public access, including impact on long distance walking and cycling routes and
scenic routes 
 impacts on road traffic and on adjacent trunk roads, including during
construction 
 cumulative impacts
 biodiversity including impacts on birds
 impacts on historic environment
 aviation and defence interests including seismological recording 
10.4. In terms of the adopted South Lanarkshire Local Development Plan 2, Policy 18:
Renewable Energy states that applications for renewable energy infrastructure
developments will be supported subject to an assessment against the relevant criteria
and requirements set out in the Assessment Checklist for Renewable Energy
Proposals found in Policy RE1 Renewable Energy.  Renewable energy proposals
should also take into account the considerations, criteria and guidance contained
within the Supporting Planning Guidance (SPG) on Renewable Energy, Landscape
Capacity Study for Wind Energy (2019 as amended). These are broadly similar to the
criteria in NPF4 Policy 11. 
10.5. A key consideration is the impact of the proposal on the landscape character and
visual amenity of the area. The strategy map SLLDP2 shows the land proposed for
wind turbines as being designated as an area which prevents coalescence between
existing clusters.  In this case this relates to Clyde windfarm to the south and
Andershaw to the northwest.  The solar array to the north of Abington Services sits
adjacent to the Upper Clyde Valley and Tinto Special Landscape Area. 
10.6 The Landscape and Visual Assessment (LVIA) which forms part of the Environmental
Impact Assessment (EIA) is a key document in assessing the proposals, as the
landscape impact of the proposed development is a key determining issue from the
Council’s perspective. 
74

Page 75

10.7. The LVIA addresses the potential effects that the proposed development would have
on the landscape, key viewpoints and the visual amenity of the local environment.  The
proposed turbines would have the most impact on the landscape character of the area. 
A Zone of Theoretical Visibility (ZVI) map identifies the receptors likely to be affected
by views of the proposed development, which include residents and those using the
roads and footpaths within the identified study area (which is focussed on
approximately 25km from the site).  Visual effects are identified for several selected
viewpoints representative of views seen by people in the surrounding area. 
10.8. The ZTV mapping and visualisations indicate that the turbines will be visible from the
immediate vicinity of the site, extending up to hills/ridges within approximately 5km,
beyond which visibility would depend more on topography and woodland cover.  Views
from the northern half of the study area, across low lying farmland and moorland would
include the turbine array in the foreground of views of the Southern Uplands to the
further south.  Views from the southern half of the study area would be more limited
due to local topography changes within the Southern Uplands. 
10.9. The effects on landscape character were assessed using established Landscape
Character Types (LCTs) and methodology.  Most of the proposed development would
be located within the Plateau Moorland and Glasgow and the Clyde Valley LCTs
(which include 21 of the 22 proposed turbines).  The other LCTs would include limited
parts of the proposed development, including permanent infrastructure, the solar array
and temporary construction compounds. 
10.10. The topography of the Southern Upland hills around the site exerts an influence over
the visibility of the proposed development.  Widespread theoretical visibility is
predicated within 5km of the site, extending beyond onto plateau farmland either side
of the M74 to the northwest, and summits and upper slopes of the Southern Uplands
to the east, west and south, gradually reducing in geographical extent as the distance
from the site increases. 
10.11. It is important to note that the surrounding landscape includes several existing,
operational wind farms, including the Clyde Windfarm (and extension) to the southeast
and Middlemuir and Andershaw to the west.  The proposed development would
occupy an area between these two existing turbine clusters, albeit appearing as
separate from these existing windfarms.  Further existing and planned energy related
developments are located along the stretch of the M74 as it passes through the site. 
10.12. A very minor part of the proposed development lies on the northernmost edge of the
Leadhills and Lowther Hills Special Landscape Area (SLA) involving two turbines, two
areas of hardstanding, 1.4km of access track, approximately 450 solar panels and
some associated infrastructure.  The defined qualities of the SLA include a lack of
extensive forestry or wind farms which creates a sense of emptiness.  However, this
quality cannot be applied equally to all parts of the designated area due to the
presence of the existing wind farms noted above which create the boundary to the
designed area.  For this reason, the proposed development is not considered to have
a significant adverse impact on quality of the designation. 
10.13 Visibility of the proposed solar array would be widespread within 1km of the site and
more limited beyond this, being limited to views from higher ground to the east and
west of the M74, within the River Clyde valley to the east, and southwest of Abington.
The array proposed on the land in the Upper Clyde Valley and Tinto SLA is bounded
by the M74 and the A702 which forms a key gateway into the Clydesdale area and is
immediately adjacent to the Upper Clyde Valley and Tinto SLA.  It has open views
across the Upper Clyde valley floor and provides an attractive setting for the wider
75

Page 76

landscape character.  It would be sensitive to the introduction of the solar farm in this
part of the site.  However, it is not within a designated landscape area of value. 
10.14. The proposed substation and BESS would be located within the existing Thirstone
Quarry, and would be sited within the excavated area, where the walls of the quarry
would provide screening, reducing the visibility of these elements of the overall
development. 
10.15. NPF4 Policy 11 advises that where significant landscape and visual impacts are of a
localised nature, they will generally be acceptable.  Given the transient nature of those
landscape and visual impacts associated with the proposed development and given
also that the vast majority of those people who experience the landscape within which
the proposed development is located do so as passengers in cars travelling
north/south along the M74, it is considered that these impacts can reasonably be
described as localised. 
10.16  Policy 11 contains a range of other impacts that proposals must demonstrate will be
addressed and they can be cross-referenced to other NPF4 policy areas and policy in
SLLDP2. 
10.17. NPF4 Policy 3 – Biodiversity, seeks to protect biodiversity, reverse any biodiversity
loss, deliver positive effects for development and strengthen nature networks.  NPF4
Policy 4 – Natural Places seeks to protect, restore and enhance natural assets, making
best use of nature-based solutions.  NPF4 Policy 5 – Soils seeks to protect carbon-
rich soils, restore degraded peatlands and minimise disturbance to soils because of
development.  These various policy considerations are echoed within Policy 14 –
Natural and Historic Environment of the SLLDP2. 
10.18. The application is supported by an Environmental Impact Assessment (EIA), which
includes detailed survey work in relation to landscape, ecology, ornithology, hydrology,
geology and other relevant environmental considerations.  NatureScot originally
objected to the proposed development based upon potential impact on adjacent
Muirkirk and North Lowther Uplands Special Protection Area, the North Lowther
Uplands Site of Special Scientific Interest and the Red Moss Special Area of
Conservation and Site of Special Scientific Interest. 
10.19 Following further discussion NatureScot have advised that they will retain their
objection to this proposal unless it is made subject to conditions requiring mitigation
detailed in their response to be carried out. 
10.20 Consequently, it is considered that the proposals comply with the relevant criteria of
the above noted policies, subject to the identified mitigation measures being fully
implemented on site as part of the proposed development.  On this basis, the
application is considered to comply with the relevant provisions of Policies 3, 4 and 5
of NPF4 and Policy 14 of the SLLDP2. 
10.21. Policy 6 – Forestry, woodland and trees of NPF4 seeks to identify and protect existing
woodland and the potential for its enhancement or expansion to avoid habitat
fragmentation and improve ecological connectivity, helping to support and expand
nature networks.  While full details of the implementation of the proposals would
require to be agreed between the applicants and the Scottish Government, subject to
these details being agreed it is considered that the proposals do not raise any
significant concerns in respect of the provisions of Policy 6. 
76

Page 77

10.22. Policy 7 – Historic assets and places of NPF4 seeks to protect and enhance historic
environment assets and places and to enable positive change as a catalyst for
regeneration.  Similar policy regarding the protection of the historic environment is
contained within Policy 14 of SLLDP2.  Historic Environment Scotland (HES) has
raised an objection to the proposed development based upon adverse impact on the
setting of four scheduled ancient monuments within the vicinity of the site. 
10.23 These issues have been the subject of ongoing discussions between the applicant
and HES, however, a further recent response from HES maintains their objection. In
that respect the proposal is contrary to Policy 7 in NPF4 and Policy 14 in SLLDP2. 
10.23. NPF 4 Policy 22 – Flood Risk Assessment seeks to strengthen resilience to flood risk
by promoting avoidance as a first principle and reducing the vulnerability of existing
and future development to flooding.  Similar policy is provided in SLLDP2 Policy 16 -
Water Environment and Flooding.  Due to the absence of any identifiable sources of
potential flooding which could affect the proposed development or potential flood
issues arising from the development, a detailed consideration of flood related matters
has been scoped out of the EIA which accompanies this application with it being further
noted that, within their consultation response on the application, SEPA has raised no
issue of concern with regards to flood related matters. On balance therefore, the
proposals are compliant with the provisions of Policy 22 of NPF4 and Policy 16 of
SLLDP2. 
10.24. NPF4 Policy 29 – Rural development seeks to encourage rural economic activity,
innovation and diversification whilst ensuring that the distinctive character of the rural
area and the service function of small towns, natural assets and cultural heritage are
safeguarded and enhanced.  Similar policy is provided in SLLDP2 Policy 4 – Green
Belt and Rural Area.  Subject to the resolution of any outstanding matters raised by
external consultees to the satisfaction of the Scottish Government as part of their
assessment of the proposal, the view is taken that the proposals would represent an
appropriate rural development that would not significantly adversely affect the rural
area while making a positive contribution in respect of Scotland’s climate change
ambitions.  The proposals are therefore compliant with the provisions of Policy 29 of
NPF4 and Policy 4 of SLLDP2. 
10.25. Policy 5 - Development Management and Placemaking of SLLDP2 states that
development proposals should take account of and be integrated within the local
context and built form.  In addition, proposals should comply with general development
management principles, regarding issues such as amenity, traffic and transportation
and environmental considerations.  Policy 15 – Traffic and Transport further enforces
the requirements to account for and mitigate the transport impact associated with
significant scale development proposals.   
10.26 The Council’s Roads, Transportation and Fleet Services have confirmed that, subject
to recommended conditions, the proposals would not raise any unacceptable
transportation impacts.  Similarly, Environmental Services have confirmed that,
subject to appropriate conditions, the proposals would not create any unacceptable
noise or other environmental impact in this case.  Overall, the proposed development
would not generate unacceptable amenity impacts and is considered to comply with
the relevant provisions of Policies 5 and 15 of SLLDP2. 
10.27 In terms of aviation and defence interests NATS and the MOD have objected to the
application on the grounds of the impact on air traffic safety, low flying MOD aircraft
and the effect on the Eskdalemuir seismology recording facility in that there is currently
no seismic noise capacity available which would have an unacceptable impact on the
77

Page 78

operation and capability of the array.  As a result, the proposal is contrary to NPF4
Policy 11 and Policy 19 in SLLDP2. 
10.28  As such, while the proposals submitted have demonstrated that they address most of
the impacts listed in NPF4 and the assessment criteria in SLLDP2, the multiple
objections that have been received from statutory consultees remain unresolved and
bring the proposal into conflict with the Development Plan. 
10.29 The timescale for the Council responding to the consultation expires at the end of
August and while a request was submitted to the Energy Consents Unit to allow more
time to address the outstanding objections; the response received stated that in order
to improve current average timescales for determining Electricity Act applications, the
request from the Planning Authority for additional time to address outstanding
objections was not acceptable. 
10.30 As such, this has led to the recommendation to Committee that the Planning Authority
should object to this proposal. 
11. Conclusion 
11.1 In conclusion, it is considered that the proposed development does not fully comply
with the relevant policies of both the adopted National Planning Framework 4 and the
adopted South Lanarkshire Local Development Plan 2 in terms of policy relating to the
historic environment, air traffic safety and the impact on Eskdalemuir. 
11.2 It is therefore recommended that the Scottish Government be notified that the Council
objects to the application for the reasons stated below. 
12. Recommendation and Reasons
12.1. The Committee is asked to agree the following recommendation:- 
That the Scottish Government Energy Consents Unit is informed that South 
Lanarkshire Council objects to the granting of consent under Section 36 of the
Electricity Act 1989. 
Reasons for objection 
1. The proposals are contrary to Policies 3 and 11 of National Planning Framework
4 in that the applicant has failed to demonstrate that the impacts on the historic
environment and aviation and defence interests have not been addressed 
2. The proposals are contrary to Policy 18 of the adopted South Lanarkshire Local
Development Plan 2 and the South Lanarkshire Council Supporting Planning
Guidance on Renewable Energy due to the adverse impact on the historic
environment and aviation and defence interests. 
13. Next Steps
13.1. If members agree with this recommendation, Scottish Ministers (via the Energy
Consents Unit) will be advised of the Council’s objection to the proposed development.
Under the terms of the Electricity Act 1989, where the planning authority object to an
application made under Section 36, a public inquiry is required to be held.  However,
a public inquiry is not required where the Scottish Ministers propose to grant the
application subject to modifications or conditions that address the planning authority’s
objection.  
78

Page 79

13.2. In the event Scottish Ministers cause a public inquiry to be held, a further report will
be presented to the Planning Committee advising of this and giving members the
opportunity to confirm their objection to the application. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
https://publicaccess.southlanarkshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SL12E1OP08N00 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk  
79

Page 80

80

Page 81

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/24/1561
Proposal:  Erection of residential development comprising of 64 detached
dwellinghouses, access roads, landscaping, land engineering
operations and associated work, including demolition of
dwellinghouse 
Site Address:  Land 100M North of Beechfield Manor
Meikle Earnock Road
Hamilton
Applicant:  Miller Homes Ltd and Karen Selfridge
Agent:  North Planning and Development
Ward:  18 Hamilton West and Earnock
Application Type:  Full Planning Permission
Advert Date:  Hamilton Advertiser 24 April 2025
Development Plan
Compliance: 
Yes
Departures:  N/A
Recommendation:  Grant subject to conditions following the conclusion of an appropriate
legal agreement 
Legal Agreement:  Section 69 agreement to cover developer contributions
Direction to
Scottish Ministers 
N/A 
10
81

Page 82

1. Reason for Report
1.1. The Scheme of Delegation requires that all Major Developments, such as this proposal
for more than 50 dwellings, are determined by the Planning Committee. 
2. Site Description
2.1. The 3.06 ha site is located on the southwestern edge of Hamilton.  The site is situated
to the north of Meikle Earnock Road (around 1.6km long) which links the site to Low
Waters Road, leading to Hamilton Town Centre.   
2.2. The site is part of the Hamilton Community Growth Area.  There are recently
completed modern houses to the west and south of the site.  To the north lies open
fields and a local nature reserve, Torhead Lake.  To the east lies a large electrical
substation and there are pylons in proximity to the site, and five residential dwellings
fronting Meikle Earnock Road. 
2.3. The site currently comprises a field with a former garden centre to the frontage of the
site and an existing dwellinghouse – known as Beechfield Manor.  The site is generally
level; however, there is a low point in the site in the northeast corner adjacent to the
existing residential site.  An existing hedge line runs along the western boundary. 
3. Description of Proposed Development
3.1. Planning permission is sought for the erection of 64 dwellinghouses with associated
roads, drainage, landscaping and open space and associated demolition of an existing
dwellinghouse - Beechfield Manor. 
3.2. The initial layout included 58 detached dwellings all with integral garages.  During the
handling of the application, amendments were sought, the impact is set out in more
detail in the assessment section.  The number of dwellings has increased to 64 and
contains a mix of terraced, semi-detached and detached dwellings of three to five
bedrooms. 
3.3. The proposal includes one vehicular entry point off Meikle Earnock Road.  The
entrance into the site then splits providing two routes around a central amenity/play
space with dwellings arranged either side.  The roads lead to the rear of the site
providing another pocket of housing to the rear.  A mix of road finishes and
arrangements are provided to identify the primary route to the site.  There are
connections to the cycle way on Meikle Earnock Road, and two pedestrian paths
linking into the adjacent residential site, to the east.   
3.4. Landscaping details incorporating biodiversity measures have been proposed. 
Furthermore, a sustainable urban drainage system in the form of a below ground
cellular tank is proposed along with measures including permeable paving and swales
to mitigate against the proposed layout and improve existing drainage.   
4. Relevant Planning History
4.1. This application is a major application which required a proposal of application notice
(PoAN) prior to submission of the planning application.  The PoAN notifies the
Planning Authority of the intention to submit a major planning application and begins
the consultation period with relevant stakeholders.  The PoAN was duly submitted and
consultation took place over summer 2024 under reference P/24/0005/PAN. 
4.2. The Hamilton Community Growth Area was included in the South Lanarkshire Local
Plan 2006 and a masterplan developed for approximately 2000 homes has been
carried through subsequent local development plans.  It was recorded in 2024 that
82

Page 83

over 850 dwellings of those planned have been built to date.  The proposal would
represent the last site along Meikle Earnock Road. 
5. Supporting Information 
5.1. In support of the planning application, the following information has been submitted:- 
 Design and Access Statement
 Energy Statement
 Tree Report
 Pre-Application Consultation Report
 Statement of Community Benefit 
 Stage 1 Geoenvironmental Investigation Report
 Drainage Strategy 
6. Consultations
6.1. Environmental Services - No objection subject to conditions relating to contaminated
land and construction noise.
Response: Noted, the requested conditions shall be imposed on any permission
issued. 
6.2. Education Resources – No objection, subject to contributions to increase capacity in
relevant catchment schools.
Response: Noted, contributions shall be sought to mitigate impacts of the
development, a concern raised by representees. 
6.3. Roads (Development Management) – No objection, subject to conditions relating to
the construction management plan, delivery routes, parking, visibility splays and
footway connections. 
Response – Noted, the requested conditions shall be imposed on any permission
issued. 
6.4. Roads (Flooding) – No objection.
Response – Noted. 
6.5. Scottish Water – No objection.
Response: Noted 
6.6. West of Scotland Archaeology Service – No objections, subject to a condition requiring
a programme of archaeological works.
Response: Noted, the requested condition shall be imposed on any permission issued. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, which has
been readvertised in association with the increase of dwellinghouses, a total of 6
representations have been received (5 objections, 1 support).  The issues raised are
summarised as follows:- 
 Concerns for additional footpath link and the potential for anti-social behaviour
 Increase in housing is against nature and global climate emissions
 Concerns relating to existing drainage infrastructure, including historical
connections within the site
 Concerns on impact on nature conservation 
 Concerns on impact on road safety 
 Concerns relating to traffic generation 
83

Page 84

 Concerns relating to noise and disturbance 
 Concerns proposal does not align with planning policy relating to Scottish
Planning Policy, as it would not contribute positively to community and
exacerbates existing pressures
 Concern of impact on schools
 Lack of bus services along this section of road 
7.2. The above issues are considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 Tackling the climate and nature crises
 Policy 2 Climate mitigation and adaptation
 Policy 3 Biodiversity
 Policy 5 Soils
 Policy 14 Design, quality and place
 Policy 15 Local Living and 20 minute neighbourhoods
 Policy 16 Quality homes
 Policy 18 Infrastructure first
 Policy 19 Heating and cooling
 Policy 20 Blue and green infrastructure
 Policy 21 Play, recreation and sport
 Policy 22 Flood risk and water management 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 – Spatial Strategy
 Policy 2 – Climate Change
 Policy 5 – Development Management and Placemaking
 Policy 7 – Community Infrastructure Assessment
 Policy 16 – Water Environment and Flooding
 Policy 11 - Housing
 Policy 12 – Affordable Housing
 Policy 13 – Green Network and Greenspace
 Policy 14 – Natural and Historic Environment 
84

Page 85

SLLDP2 Volume 2 Policies
 Policy SDCC7 - Low and Zero Carbon Emissions from New Buildings
 Policy SDCC3 - Sustainable Drainage Systems 
 Policy SDCC2 - Flood Risk
 Policy SDCC4 - Sustainable Transport
 Policy DM1 – New Development Design 
 Policy NHE18 – Walking, Cycling and Riding Routes
 Policy DM15 - Water Supply 
South Lanarkshire Council (SLC) Supporting Planning Guidance
Community Infrastructure Assessment 
Electric Vehicle Charging Points August 2022 
9. Guidance
9.1. None relevant. 
10. Assessment and Discussion
10.1. Introduction
Full planning permission is sought for the erection of 64 dwellings off Meikle Earnock
Road.  The main issues to be addressed in the determination of this application include
the detailed layout, siting, design and an assessment of technical matters. 
10.2. The policies contained within National Planning Framework 4 and the South
Lanarkshire Local Development Plan 2 are the main consideration in this case,
together with an assessment of any other material planning considerations. 
10.3. Principle of Development
SLLDP2 Policy 1 Spatial Strategy supports the development of the Community Growth
Areas (CGAs), this site is located in the Hamilton CGA.  SLLDP2 Policy 11 Housing
advises development will be supported on sites included in the Housing Land Audit
and identified on the proposals map. NPF4 Policy 16 (a) Quality Homes also supports
allocated sites.  In conclusion the proposal for housing at this site is suitable in
principle.   
10.4. Climate Change
NPF4 Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2 aim to ensure that proposals for
new development must, where possible, seek to minimise and mitigate against the
effects of climate change.  SLLDP2 Policy SDCC7 requires the use of low carbon
technologies.  NPF4 Policy 19 Heating and cooling advises buildings should be
designed to promote sustainable temperature management, prioritising matters such
as siting, orientation and materials. 
10.5. The submitted Energy Statement sets out that where possible, habitable rooms have
been directed to south and west, use of air source heat pumps are proposed, and a
range of other measures in terms of materials and construction of the proposed
dwellings are considered.  Technical considerations of the impact on flooding and
drainage are considered later in the report.  As are impact on biodiversity, green
network and soils. Therefore, overall, the proposal is considered, on balance, to meet
the terms of NPF4 Policy 1 and Policy 2 and SLLDP2 Policy 2 and SDCC7.  
85

Page 86

10.6. Layout, Siting and Design
NPF4 Policy 14 - Design, Quality and Place aims to encourage, promote, and facilitate
well designed development that makes successful places by taking a design led
approach and applying the Place Principle.  NPF4 Policy 21 Play, recreation and sport
requires proportionate play provision, which is integral to the layout and overlooked. 
10.7. The Council has set out its approach to design within its Placemaking in South
Lanarkshire sheet approved at Planning Committee in May 2025.  SLLDP2 Policy 5 –
Development Management and Placemaking advises that to ensure development
takes account of the principles of sustainable development, all proposals require to be
well designed and integrated with the local area.  Proposals should include green
infrastructure, also promoted by SLLDP Policy 13.  Policy DM1 – New Development
Design of SLLDP2 also requires development to promote quality and sustainability in
design and layout. 
10.8. The submitted Statement of Community Benefit (required by NPF4 Policy 16) sets out
the proposal would meet local housing requirements by providing adaptable and
wheelchair accessible homes which are energy efficient.  It also advises that the
proposal will provide walking, wheeling and cycling links, including open space and
green infrastructure on site.  The statement concludes that the proposal will meet local
housing requirements, provide local infrastructure and improve residential amenity of
the surrounding area. 
10.9. The initial layout submitted included 58 detached dwellings all of which included
integral garages, resulting in a car dominated layout.  During the handling of the
application the layout has been altered to a mix of detached, semi-detached and
terraced dwellings.  With changes to relocate parking by utilising side parking and
rear/mews parking arrangements.  Whilst the number of dwellings has increased to
64, this has resulted in a layout with the pedestrian in mind, improved visual amenity
of the layout and improved landscaping to the edge of the site.   
10.10. The amenity space and play provision are considered to be proportionate to the scale
of development and have been designed as an integral part of the layout.  The amenity
space is located at the entrance of the site and the relocation of parking to the rear
means the amenity/play space is well overlooked for passive surveillance, whilst being
easily and safely accessible.  Details of the play equipment will be sought by condition. 
Further path connections have been sought and shown on plans to connect into the
adjoining existing residential development and the wider paths for the CGA, in line with
NPF4 Policy 20 and SLLDP NHE18 relating to walking routes and blue/green
infrastructure. 
10.11. Whilst the house design finishes and materials proposed are in line with the type of
housing in the surrounding area.  There has been an increased use in walling and
landscaping at key points of the proposal, including those fronting Meikle Earnock. 
10.12. These changes support the aims of successful placemaking in South Lanarkshire and
the proposal is deemed to meet the terms of NPF4 Policies 14, 12, 20 and 21 and
SLLDP2 Policies 5, 13, DM1 and NHE18. 
10.13. Infrastructure and Affordable Housing. 
NPF4 Policy 18 Infrastructure first requires that the impact of development proposals
on infrastructure should be mitigated.  This includes education, existing and planned
transport infrastructure and recreation. The SLLDP2 Policy 7 Community
Infrastructure Assessment has guidance relating to this matter under the Community
Infrastructure Assessment.  
86

Page 87

10.14. A cumulative assessment of the Hamilton CGA was undertaken when a Section 75
agreement for the majority of the Community Growth Area was agreed covering topics
of affordable housing, education, roads and community infrastructure.  Whilst the
Section 75 considered the whole of the Community Growth Area this site was not
within its legal boundary.  Any receipt of contributions to mitigate impact of this
development would be in line with the cumulative assessment for the overall CGA. 
The applicant has offered that contributions would be provided in the form of a Section
69 legal agreement.   
10.15. Sustainable Transport and Local Living. 
NPF4 Policy 13 Sustainable Transport and NPF4 Policy 15 Local Living seek to
promote proposals that encourage, promote and facilitate developments that prioritise
walking, wheeling, cycling and public transport for everyday travel.  This is a concern
which has been raised by representees. 
10.16. The Community Growth Area, albeit initiated a number of years ago, was designed
with the above concern in mind.  As this site is at the edge of the Community Growth
Area, by its nature is likely to be less well served than others.  Meikle Earnock Road
serves as the main route to local facilities.  It has been designed throughout the
development of the CGA to provide segregated and safe walking routes and a
cycleway, and to accommodate any re-routed bus route to the Hamilton town centre
and local facilities. 
10.17. This would position a bus stop on Meikle Earnock Road approximately 200m from the
application site once there is sufficient population for a viable service.  Within the
proposal, there would be paths of sufficient width and gradient to accommodate
wheeling.  All dwellings would have sufficient space within integral garaging or garden
ground for cycle parking. 
10.18. Overall, given the context of the Hamilton CGA and the design of Meikle Earnock
Road, it is considered that the proposal meets the sustainable transport and local living
policies, NPF4 Policy 13, 15 and SLLDP Policy SDCC4. 
10.19. Biodiversity and Landscaping 
Policy 3 Biodiversity requires all major proposals will only be supported where it can
be demonstrated that the proposal will conserve, restore and enhance biodiversity,
including nature networks so they are in a demonstrably better state than without
intervention.  This site is located on the outer edge of the CGA and the Hamilton
settlement boundary and shall provide the defensible green belt boundary. 
10.20. An ecological assessment has been submitted concluding there are no protected
species on site and a review of surrounding and existing characteristics which sets out
enhancement recommendations to achieve positive effects on biodiversity.  These
include preconstruction survey works, protection areas from adjacent oak tree and
sets out opportunities to include bird boxes to trees and buildings, retain, protect and
enhance the existing hedgerow, plant more native species hedges and trees as part
of landscaping and wildflower planting and shrub planting within amenity areas.  These
recommendations have been reflected in the landscaping plans submitted, there is
use of hedging and trees in front gardens, flowering lawns, bulbs within amenity areas,
and use of log piles and bird boxes.  The landscaping details include construction
details in line with British Standards relating to soils, details will be sought on
construction details to minimise disturbance to soils on the retained hedge boundary
in line with NPF4 Policy 5 Soils.  Conditions shall be imposed to ensure
preconstruction surveys, tree protection and maintenance requirements of all
87

Page 88

elements of biodiversity and landscaping.  In summation, the proposal meets the terms
of NPF4 Policy 3 Biodiversity. 
10.21. Technical Matters 
NPF4 Policy 22 Flood Risk and Water Management seek to ensure that development
proposals will not increase the risk of surface water flooding to others or be at risk
itself.  All rain and surface water shall be managed through sustainable urban drainage
(SUDS), SLLDP Policy 16 and SDCC3 carries similar aims, and the area of
impermeable surface is to be minimised.  Existing drainage issues have been raised
by representees. 
10.22. There is risk of surface water flooding on the northwest corner of the site, which has
been taken into consideration in the technical design of the drainage layout.  The
drainage layout includes an attenuation tank at the northeast corner of the site and the
use of swales to treat surface water.  Permeable paving has been introduced on
driveways and impermeable surfacing reduced.  A condition shall be imposed to seek
any further detailed technical requirements in relation to drainage.  Scottish Water
have raised no objections.  The proposal meets the terms of NPF4 Policy 22 and
SLLDP2 SDCC3 and DM15. 
10.23. Conclusion 
The site is located in the Hamilton Community Growth Area.  As such, the principle of
residential development at this site been established.  On balance, the loss of the
existing dwellinghouse can be accommodated.  The design of Meikle Earnock Road
can accommodate walking and cycle routes and a possible bus route provide
sustainable links to the site. 
10.24. The internal layout provides a focus on the central amenity/play space and the
pedestrian.  The design of the dwellings fits with the surrounding character and is
deemed to meet the terms of NPF4 Policy 14 and SLLDP2 Policies 5 and DM1. 
Technical aspects in terms of roads, flooding and drainage and servicing have been
resolved, meeting NPF4 Policy 22 and SLLDP2 Policies SDCC3 and DM15.  The
existing biodiversity of the site and surrounding area has been considered and
biodiversity enhancement measures identified along with suitable landscaping, in line
with NPF4 Policy 3.  Contributions to education, roads, community infrastructure and
affordable housing shall be sought to mitigate the impact of the proposal. 
10.25. Overall, the proposal represents an appropriate form of development and addresses
the relevant technical matters.  The proposal is acceptable and it is recommended that
planning permission is granted subject to conditions and the conclusion of a legal
agreement. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant subject to conditions following conclusion of a legal agreement:- 
The Section 69 agreement shall cover subject matters of affordable housing,
education, roads and community infrastructure.  If the Section 69 agreement is not
agreed within six months of the decision of Committee, the Planning Authority reserve
the right to return to Committee to seek refusal of the application. 
88

Page 89

Conditions 
01. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
02. That before any development commences on site or before any materials are ordered
or brought to the site, details and samples of all materials to be used as external
finishes on the development shall be submitted to and approved by the Council as
Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
03. That prior to any works starting on site the applicant is required to undertake a
comprehensive site investigation, carried out to the appropriate Phase level, to be
submitted to and approved in writing by the Council as Planning Authority.  The
investigation shall be completed in accordance with advice given in the following:- 
 Planning Advice Note 33 (2000) and Part IIA of the Environmental Protection Act
1990 (as inserted by section 57 of the Environment Act 1995)
 Land Contamination Risk Management Guidance (LCRM)– issued by DEFRA
and the Environment Agency
 the latest edition of BS 10175– British Standards institution ‘The Investigation of
Potentially Contaminated Sites – Code of Practice’. 
(a) The Phase 1 investigation indicates potential pollution linkages, and the formulated
Conceptual Site Model for these linkages has been subjected to risk assessment.  A
Phase 2 investigation is required, and following a risk assessment of all relevant
pollution linkages using site specific assessment criteria will require to be submitted.
,
(b) If the risk assessment identifies any unacceptable risks, a detailed remediation
strategy will be submitted to and approved in writing by the Council as Planning
Authority.  No works other than investigative works shall be carried out on site prior to
receipt of the Council’s written approval of the remediation plan. 
Reason: To avoid unacceptable risks to human health and the environment, to ensure
that the land is remediated and made suitable for its proposed use. 
04. That before any work commences on the site a scheme for the provision of equipped
play area(s) within the application site shall be submitted to the Council as Planning
Authority for written approval and this shall include:- 
(a) details of the type and location of play equipment, seating and litter bins to be
situated within the play area(s);
(b) details of the surface treatment of the play area, including the location and type of
safety surface to be installed;
(c) details of the fences to be erected around the play area(s); and
(d) details of the phasing of these works. 
Reason: To ensure the provision of adequate play facilities within the site. 
89

Page 90

05. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and shall include signed appendices as required.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved by the Council
as Planning Authority. 
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
06. That prior to the commencement of any works associated with the development, a
Construction Traffic Management Plan shall be submitted to and approved in writing
by the Council as Roads and Planning Authority and implemented thereafter.  This
plan should include details of delivery route for HGV traffic and construction vehicles,
dilapidation surveys in line with the delivery route, access and parking provision for
staff and visitors, intended working hours, the management and storage of deliveries
and further information regarding the provision of wheel washing facilities to prevent
mud being carried on to the adopted road.   
Reason: In order to retain effective planning control. 
07. That prior to any work commencing on the site, a maintenance management schedule
for the landscaping scheme and biodiversity enhancement measures shown on
approved plans shall be submitted to and approved by the Council as Planning
Authority.  The schedule shall detail areas to be managed communally i.e. by factoring
arrangement and those areas retained under private management. 
Reason: In the interests of the visual amenity and biodiversity of the area. 
08. No development shall take place within the development site as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted by the applicant, agreed by the West of Scotland Archaeology Service,
and approved by the Council as Planning Authority.  Thereafter the developer shall
ensure that the programme of archaeological works is fully implemented and that all
recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Council as Planning Authority in agreement with
the West of Scotland Archaeology Service. 
Reason: In order to safeguard any archaeological items of interest or finds. 
09. That no development shall commence until pre-construction species surveys are
carried out within the development site in accordance with the Preliminary Ecological
Appraisal dated 3 February 2025.  Where protected species are found to be present
and could be impacted by the development, a species protection plan should be
submitted to and approved in writing by the Council as Planning Authority. 
Reason: In order to retain effective planning control.  
90

Page 91

10. Prior to the commencement of the development hereby approved (including any
demolition and all preparatory work), a scheme for the protection of the retained
hedgerow and adjacent soils on the western boundary and retained tree 1038 on tree
constraints plan, in accordance with BS 5837:2012, including a tree protection plan(s)
(TPP) and an arboricultural method statement (AMS) shall be submitted to and
approved in writing by the Council as Planning Authority. 
Reason: To ensure that adequate steps are taken to protect existing hedgerow and
trees on the site throughout the period of the proposed building operations. 
11. That prior to the completion or occupation of the last dwellinghouses within the
development, all of the works required for the provision of equipped play area(s)
included in the scheme approved under the terms of Condition 04, shall be completed,
and thereafter, that area shall not be used for any purpose other than as an equipped
play area. 
Reason: To ensure the provision of adequate play facilities within the site. 
12. That before the first dwelling house is completed or brought into use, the footway along
the frontage and connecting to existing footway on Meikle Earnock Road as shown on
approved drawing MER0-SL-01 Rev N shall be laid out and constructed in accordance
with the specification of the Council as Roads and Planning Authority. 
Reason:  To ensure the provision of pedestrian connections to and from the site.    
13. That before the development hereby approved is completed or brought into use, a
driveway access shall be formed of 2m x 20m where there are traffic calming
measures and 2m x 35m where there are none.  A pedestrian visibility splay of 2.4m
by 2.4m from the heel of the footway shall be provided. 
Reason: In the interests of traffic and public safety. 
12.   Reason for Decision
12.1. The application seeks full planning permission for the erection of 64 dwellinghouses
including access roads, landscaping, land engineering operations and associated
works including demolition of the existing dwelling.  The proposed residential use on
an allocated site in the Hamilton Community Growth Area (CGA) is suitable in
principle.  The detailed proposed layout and design is considered suitable in terms of
the surrounding character of the CGA, placemaking and technical aspects.  The
proposal meets the terms of Policies 1, 2, 5, 7, 16, 11, 12, 13, 14, SDCC7, SDCC3,
SDCC2, SDCC 4, DM1, NHE18 and DM15 of the South Lanarkshire Local
Development Plan 2 and Policies 1, 2, 3, 5, 12, 14, 15, 16, 18, 19, 20, 21 and 22 of
National Planning Framework 4. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/24/1561 - Erection of 64 dwellinghouses including access roads, landscaping, land
engineering operations and associated work, including demolition of existing dwellinghouse.  
91

Page 92

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
92

Page 93

93

Page 94

94

Page 95

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0229
Proposal:  Change of use of nursery (Class 10) to 3no. retail/professional
services units (Class 1A) on ground floor and HMO flatted dwelling
(sui generis) on first floor and associated alterations, and formation of
car park 
Site Address:  51 Machan Road
Larkhall
ML9 1HX 
Applicant:  Mr Sikandar Cheema
Agent:  Scott Allan
Ward:  20 – Larkhall
Application Type:  Full Planning Permission
Advert Date:  N/A
Development Plan
Compliance: 
No
Departures:  N/A
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
11
95

Page 96

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under the
South Lanarkshire Council Scheme of Delegation, as it has more than 5 letters of
representation both in support and objecting to the proposal.   
2. Site Description
2.1. The site relates to a vacant commercial building at 51 Machan Road which is adjacent
to an area of open space.  The site is within the settlement of Larkhall as defined in
the South Lanarkshire Local Development Plan 2. 
2.2. The building was formerly occupied by Big Bird Nursery (Class 10).  It has a total
footprint of 324m2, with a two-storey element of 149m2.  The single-storey section has
a flat roof, while the upper storey has a gabled pitched roof.  The building is finished
externally in render with some stone detailing. 
2.3. The rectangular site is approximately 0.13ha, including 560m2 of public open space
currently in Council ownership.  Any transfer of ownership would require the
appropriate process to be undertaken separately from the consideration of this
planning application.  The site lies adjacent to a church, with the surrounding area
primarily comprising dwellinghouses.  Machan Road forms part of the B7078, the main
thoroughfare through Larkhall, and the site is located approximately 0.5 miles south of
the town centre. 
3. Description of Proposed Development
3.1. The proposal is for the change of use of the ground floor to 3 retail/professional service
units (Class 1A) and the upper floor to a 5-bed House in Multiple Occupation (HMO). 
The proposed floor areas are approximately: 1 unit at 156m², 2 units at 50m² each,
and the HMO at 120m².  The development includes access alterations, car parking,
window and door changes, and fencing to create bin stores and a private garden for
the residential unit. 
4. Relevant Planning History
4.1. None 
5. Supporting Information 
5.1. Information submitted in support of the application includes:- 
 Supporting statement
 Transportation report
 Parking survey 
6. Consultations
6.1. Roads Development Management - The proposed access arrangements and parking
provision are acceptable. 
Response: Noted 
6.2. Environmental Services - No adverse comments or objections. 
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
347 representations have been received (252 objection, 95 support).  The issues
raised are summarised as follows:- 
96

Page 97

Principle of Development
 Not the right location for shops
 Not the right location for an HMO 
Amenity
 Noise
 Waste
 Disruption
 Antisocial behaviour
 Loss of green/open space 
Access
 Insufficient parking
 Increase traffic
 Road safety
 The parking survey that has been submitted is flawed 
7.2. The above matters are considered in the assessment below and a full copy of the
representations are available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The development plan comprises the
South Lanarkshire Local Development Plan 2 and National Planning Framework 4. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies
 Policy 1 Tackling the climate and nature crisis
 Policy 2 Climate mitigation and adaptation
 Policy 3 Biodiversity
 Policy 9 Brownfield, vacant and derelict land and empty buildings
 Policy 12 Zero waste
 Policy 13 Sustainable transport
 Policy 14 Design, quality and place
 Policy 15 Local living and 20 minute neighbourhoods
 Policy 16 Quality homes
 Policy 28 Retail 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will, therefore, also
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2. 
97

Page 98

SLLDP2 Volume 1 Policies
 Policy 2 Climate Change
 Policy 3 General Urban Areas and Settlements
 Policy 5 Development Management and Placemaking
 Policy 10 New Retail/Commercial Proposals 
South Lanarkshire Council (SLC) Supporting Planning Guidance
 Electric Vehicle Charging Point Supporting Guidance 2022 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Principle of Development
Policies 9 and 12 of NPF4 aim to encourage and facilitate the sustainable reuse of
vacant and empty buildings to reduce the reliance on greenfield development and
minimise waste.  The nursery use is redundant as the building is vacant therefore a
proposal to bring the building into use aligns with the intention of these policies. 
10.2. Regarding the residential element of the proposal, the site is within a settlement where
Policy 3 of the SLLDP2 and Policy 16 offer support to small scale residential proposals
that provide quality homes with good amenity.  The proposed HMO meets the
minimum floor space standards set out in the Scottish Government’s 2004 guidance. 
The Planning Authority must ensure that all homes deliver high-quality living
environments.  However, the proposal would result in poor residential amenity and
fails to meet the quality home expectations of Policy 3 of SLLDP2 and Policy 16 of
NPF4. 
10.3. Regarding the retail element of the proposal, Policy 15 of NPF4 aims to create well-
connected, compact, and mixed-used neighbourhoods which enable residents to meet
their daily needs within a reasonable distance from home, preferably by walking,
cycling, or using sustainable transport.  Policy 28 of NPF4 applies a 'town centre first'
principle but supports small-scale neighbourhood retail outside town centres.  The
proposed retail units total under 270m², are in a largely residential area with limited
retail provision nearby, and benefit from pedestrian links.  As such, they would serve
a legitimate neighbourhood function.  Comments regarding the shops on Keir Hardie
Street are noted, but these are also three small units which offer different pedestrian
permeability than the application site. 
10.4. Policy 10 of the SLLDP2 sets out a town centre first approach to retail proposals and
requires retail assessments.  Unlike NPF4, there is no exception for small
neighbourhood shops.  However, per section 24(3) of the Town and Country Planning
(Scotland) Act 1997, where there are inconsistencies in policies then NPF4 takes
precedence.  Furthermore, retail assessments are required over 1,000m2 but there is
lenience for smaller proposals.  Consequently, the terms of Policy 10 of the SLLDP2
are not considered reasons for the proposal to be viewed as contrary to the
development plan. 
10.5. Layout, Siting and Design 
Policy 14 of NPF4 and Policies 5 and GBRA1 of the SLLDP2 address liveable places,
placemaking, and design quality in rural areas.  Policy 14 states that all development
should enhance the area’s quality and reflect the six qualities of a successful place:
healthy, pleasant, connected, distinctive, sustainable, and adaptable.  Policy 5
requires development to respond to the local context and built form, and to avoid
adverse impacts on amenity or neighbouring properties. 
98

Page 99

10.6. The limited private space and room sizes within the proposed HMO raise concerns
regarding the wellbeing of future occupants, which is a core consideration under the
'healthy' quality of successful places in Policy 14 of NPF4.  One of the bedrooms
measures just 6.5m2.  This can be detrimental to physical and mental wellbeing. 
Therefore, the proposal is not considered consistent with the ‘healthy’ quality of
successful places promoted by Policy 14. 
10.7. Notwithstanding that the proposal is contrary to policy due to the scale of the HMO,
the existing building is suitable for re-use and, with the proposed alterations, could
accommodate a small group of retail units with residential accommodation above in a
way that integrates with the area’s character.  The property currently appears run-
down, with boarded-up windows and evidence of vandalism; bringing it back into use
would enhance the streetscape.  The site has a long-established commercial history,
and small retail premises are a common and appropriate feature in residential areas,
generally with limited amenity impact. 
10.8. While concerns have been raised about the loss of open space, this area offers limited
amenity value beyond its visual contribution.  Landscaping is proposed around the
new car park to mitigate visual impact, and the existing footpath to the larger open
space at the rear would be retained. 
Access and Transport
10.9. Policy 13 of NPF4 aims to encourage developments prioritising sustainable travel
methods, such as walking, cycling, and public transport, while minimising
unsustainable travel.  It emphasises factors like safe and accessible connections to
local facilities, integration of transport modes, and provision of cycle parking. 
Additionally, Policy 5 of SLLDP2 requires developments to have suitable access
arrangements, including parking. 
10.10. The site is ideally located to serve as a neighbourhood shop which can be accessed
by sustainable means.  Objections were received regarding limited parking availability
and road safety concerns.  The proposed car park meets the recommended parking
standard for the scale of development and the Roads Authority have confirmed that
they find the proposal acceptable.  Furthermore, a neighbourhood shop can help
reduce vehicle movements in the area as residents have more opportunity to meet
some daily needs without using a car.  Overall, it is considered that the proposal is
conducive to the aims of Policy 13 of NPF4 and the provision of Policy 5 of the
SLLDP2. 
10.11. Sustainability
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP2 require development to minimise
climate impacts.  The scale of the proposal limits any substantial intervention via
planning, but sustainability would be promoted through the Building Standards
Service. 
10.12. Policy 3 of NPF4 requires development proposals to enhance the biodiversity value of
the site.  While biodiversity gains are limited due to the reuse of an existing building,
landscaping and planting associated with the car park could offer modest
enhancement.  Planting is proposed, and appropriate conditions could be applied if
the principle of development was acceptable.  
99

Page 100

10.13. Technical Matters 
Policy 12 of NPF4 requires appropriate waste storage and separation.  Suitable scaled
bin stores for each unit and the residence are shown on the plans, which are located
out of the streetscape and to ensure minimal conflict between the residential use and
commercial waste. 
10.14. Concerns were raised about potential use as a hot-food takeaway.  However, this
application relates solely to Class 1A uses, which do not include hot-food takeaways. 
Any such change would require a separate planning application. 
10.15. Conclusion 
In summary, the proposal for small-scale retail units aligns with the principles of the
development plan and would bring a vacant building back into use in a way that
enhances the streetscape.  However, the proposed HMO flat would not offer adequate
living standards or amenity for future residents, and this significantly undermines the
overall acceptability of the scheme.  As such, the proposal is contrary to Policy 3 of
the SLLDP2 and Policies 14 and 16 of NPF4. 
11. Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse Planning Permission for following reasons:- 
01. The proposal would be contrary to Policy 3 - General Urban Areas and Settlements of
the South Lanarkshire Local Development Plan 2 as the scale of the HMO flat would
be detrimental to the amenity of its residents. 
02. The proposal would be contrary to Policy 14 - Design, Quality and Place of National
Planning Framework 4 as the scale of the HMO flat would not promote wellbeing and
be inconsistent with the healthy quality of successful places. 
03. The proposal would be contrary to Policy 16 – Quality homes of National Planning
Framework 4 as the scale of the HMO flat is not considered sufficient to create a quality
home. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/25/0229 | Change of use of nursery (Class 10) to 3no. retail/professional services units
(Class 1A) on ground floor and HMO flatted dwelling (sui generis) on first floor and associated
alterations, and formation of car park | 51 Machan Road Larkhall ML9 1HX 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies.  
100

Page 101

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
101

Page 102

102

Page 103

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0360
Proposal:  Erection of two storey dwellinghouse for agricultural worker
Site Address:  Land 200M Southeast of Newton Farm
Newton Highway
Strathaven
South Lanarkshire 
Applicant:  Mr Robert Richie
Agent:  Stuart MacGarvie
Ward:  05 Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News - 22 April 2025
Development Plan
Compliance:
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
12
103

Page 104

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee under Section
4B(17)(e) of the adopted Scheme of Delegation 2024 as the Head of Planning and
Regulatory Services, in consultation with the Chair of the Planning Committee, has
determined it raises policy issues meriting consideration by the Planning Committee. 
2. Site Description
2.1. The site, which has an area of approximately 0.6 hectares, is located on land to the
south of Newton Farm, approximately 1km to the south of Strathaven.  The site is
bounded to the north, west and south by open countryside and to the east by a recently
constructed agricultural building. 
3. Description of Proposed Development
3.1. The proposal is for the erection of a large two storey dwellinghouse.  The proposed
dwellinghouse would comprise five double bedrooms in addition to office, living,
kitchen, dining, utility, snug and balcony areas.  Dedicated car parking and garden
ground would be provided externally to the dwellinghouse.  Access to the site would
be taken via a private access road from Newton Highway to the site.  The applicant
advises that the dwellinghouse would be for the use of a farm worker on site. 
4. Relevant Planning History
4.1. A prior notification submission was made in respect of the erection of an agricultural
building directly to the east of the application site in May 2024 (Planning Ref:
P/24/0667).  The building has since been erected on site. 
5. Supporting Information 
5.1.  The applicants have submitted a planning statement, a design statement and a labour
requirement report in support of their proposals. 
6. Consultations
6.1. Roads, Transportation and Fleet Services – offered no objection to the proposed
development, subject to conditions relating to access details, EV charging provision
and the provision of passing places along the access road to the site from the public
road.
Response: Noted. 
6.2. Environmental Services – offered no objection to the proposed development.
Response: Noted. 
6.3. Scottish Water – offered no objection to the proposed development.
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, five letters
of objection have been received.  The issues raised are summarised as follows:- 
 Scale and design
 Failure to comply with planning policy
 Impact on green belt
 Landscape impact
 Impact on road and public safety
 Climate change impact
 Insufficient justification for an agricultural worker’s dwellinghouse 
104

Page 105

The above issues are considered in the assessment below.  These letters are
available for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and
supports the planning and delivery of sustainable places, liveable places, and
productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation
 Policy 8 - Green belts
 Policy 14 - Design, quality and place
 Policy 17 - Rural homes 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking 
SLLDP2 Volume 2 Policies 
 Policy DM1 - New Development Design
 Policy GBRA1 - Rural Design and Development
 Policy GBRA10 - Accommodation Associated with an Existing or Proposed Rural
Business 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction
The main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development, its layout, siting and design,
and an assessment of technical matters.  The policies contained within National
Planning Framework 4 (NPF4) and the South Lanarkshire Local Development Plan 2
(SLLDP2) are the main considerations in this case, together with an assessment of
any other material planning considerations. 
10.2. Principle of Development
In terms of the principle of the development, the site is located within the green belt as
designated by Policy 4 – Green Belt and Rural Area of SLLDP2.  In addition, Policy 8
– Green belts of NPF4 also provides policy with regard to proposed development
proposals in green belt locations. 
105

Page 106

10.3. Policy 8 of NPF4 seeks to encourage, promote and facilitate compact urban growth
and use the land around our towns and cities sustainably.  Section a) of the policy
provides a list of development types that will be supported in principle in green belt
locations, with other development types not supported by the policy.  One of the
development types that will be supported in principle relates to residential
accommodation required and designed for a key worker in a primary industry within
the immediate vicinity of their place of employment where the presence of a worker is
essential to the operation of the enterprise.  Similar policy provision is also set out in
Policy 17 – Rural homes. 
10.4. Similarly, Policy 4 – Green Belt and Rural Area of SLLDP2, together with Policy
GBRA10 - Accommodation Associated with an Existing or Proposed Rural Business,
requires proposed developments in green belt locations to be for agricultural, forestry,
recreation or other uses generally appropriate to the countryside and resist isolated
and sporadic development.  In respect of the provision of a permanent dwellinghouse,
Policy GBRA10 requires that the business has been established on site for at least
two years. 
10.5. Whilst the business operations are linked to an existing agricultural business at
Bishopton in Renfrewshire, it has been clarified that the proposal relates to a newly
established business on the site.  As the business is newly formed on site, it cannot
be satisfactorily demonstrated at this time that it necessitates the provision of a
permanent dwellinghouse for a key worker at this location as required by Policies 8
and 17 of NPF4.  The business has also not been established for a sufficient time
period to allow compliance with Policy GBRA10 of SLLDP2.  As a result, the proposed
development would represent isolated and sporadic development within the green belt
and would also fail to comply with Policy 4 of SLLDP2.  The principle of the proposed
development is therefore unacceptable in planning policy terms. 
10.6. Siting and Design
With regard to siting and design considerations, Policy 8 of NPF4 requires proposed
developments within the green belt to be designed to ensure they are of an appropriate
scale, massing and external appearance and to be compatible with the surrounding
established countryside and landscape character.  Policy 14 of NPF4 relates to
liveable places.  Policy 14 sets out that all development should be designed to improve
the quality of an area and be consistent with the six qualities of a successful place:
healthy, pleasant, connected, distinctive, sustainable, and adaptable.  Development
proposals that are poorly designed, detrimental to the amenity of the surrounding area
or inconsistent with the six qualities of successful places, will not be supported. 
10.7. Policies 5, DM1 and GBRA1 of SLLDP2 require proposed developments to be
appropriately designed and scaled in the context of the location in which they are to
be sited.  With specific regard to agricultural workers’ dwellinghouses, Policy GBRA10
requires such dwellings to be commensurate with the functional requirements of the
business operation. 
10.8. The proposal relates to a large two storey dwellinghouse comprising five double
bedrooms with a total floor area of 366 square metres.  The proposed dwellinghouse
would not be of a scale or design that would be in keeping with its countryside location
or satisfactorily relate to the local rural landscape character.  The proposed dwelling
would also not be commensurate with its proposed use as a farm worker’s dwelling in
terms of its scale.  The proposed development would therefore fail to comply with the
provisions of Policy 8 of NPF4 and Policies 5, DM1 and GBRA10 of SLLDP2 with
regard to siting and design considerations. 
106

Page 107

10.9. Climate Change
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of climate
change.  The development is proposed in an isolated location and appropriate
justification has not been provided for the siting of the development at this location. 
The proposed development is therefore considered to be an unsuitable proposal in an
unsustainable location and fails to comply with the provisions of Policies 1 and 2 of
NPF4 or Policy 2 of SLLDP2. 
10.10. Conclusion
Following a detailed assessment of the proposals, it is concluded that the principle of
this proposed residential development within the green belt has not been justified in
this case, as it has not been demonstrated that the provision of a permanent
dwellinghouse is essential for a key worker at this location.  In addition, the proposed
development is not of an appropriate design or scale and is not commensurate with
the functional requirements of the business operation on site.  The proposal therefore
fails to comply with the relevant policies of the development plan, and it is
recommended that planning consent is refused. 
11. Recommendation and Reasons
11.1.  The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 8 - Green Belts of National Planning
Framework 4 (2023) as it has not been satisfactorily demonstrated that the proposals
comply with the criteria contained within the policy relating to the provision of new
dwellinghouses in the countryside and, as such, fail to encourage, promote and
facilitate compact urban growth and use the land around our towns and cities
sustainably. 
02. The proposal would be contrary to Policy 17 – Rural Homes of National Planning
Framework 4 (2023) as it has not been satisfactorily demonstrated that the proposals
comply with the criteria contained within the policy relating to the provision of new
dwellinghouses in the countryside and, as such, would not facilitate the provision of an
appropriate rural dwellinghouse. 
03. The proposal would be contrary to Policy 4 - Green Belt and Rural Areas and Policy
GBRA10 - Accommodation Associated with an Existing or Proposed Rural Business
of the South Lanarkshire Local Development Plan 2 (2021) as it relates to isolated,
sporadic development in the countryside and it has not been appropriately justified in
terms of being development which would require to be located within the green belt. 
04. The proposal would be contrary to Policy 5 - Development Management and
Placemaking, Policy DM1 - New Development Design, Policy GBRA1 - Rural Design
and Development and Policy GBRA10 - Accommodation Associated with an Existing
or Proposed Rural Business of the South Lanarkshire Local Development Plan 2
(2021) as it would not be appropriately scaled and would not be commensurate with
the functional requirements of an agricultural worker's dwellinghouse. 
107

Page 108

David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/25/0360 | Erection of two storey dwellinghouse for agricultural worker | Land 200M
Southeast Of Newton Farm Newton Highway Strathaven South Lanarkshire 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
108

Page 109

109

Page 110

110

Page 111

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0388
Proposal:  Installation of a 20 MW Battery Energy Storage System (BESS) with
associated infrastructure 
Site Address:  Plot 4A
Hurlawcrook Road
East Kilbride
Applicant:  Queequeg Renewables Ltd 
Agent:  Mabbett and Associates Ltd
Ward:  5 – Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News - 16 April 2025
Development Plan
Compliance:
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
13
111

Page 112

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a Major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the Scheme of Delegation requires that all major
applications are determined by the Planning Committee. 
2. Site Description
2.1. The site, which has an area of approximately 0.9 hectares, is located to the south of
Hurlawcrook Road in the Langlands area of East Kilbride.  It is designated as Core
Industrial/Business Land and is currently undeveloped. 
2.2 The land is bounded to the north by Hurlawcrook Road, with a storage and distribution
facility located opposite, to the east and west by existing industrial/commercial
properties within the Langlands industrial area and to the south by undeveloped land
forming part of the green belt.  The ground is predominantly flat and is accessed from
the north via Hurlawcrook Road. 
3. Description of Proposed Development
3.1. The proposal is for the formation of a Battery Energy Storage System (BESS) facility
and for the installation of associated infrastructure.  The facility would store electricity
and release it back into the grid when there is demand.  A vehicular access is proposed
to be formed to the site from Hurlawcrook Road.  The battery units would be enclosed
within BESS containers, similar in appearance to shipping containers. 
3.2 The proposed development would comprise of:- 
 16 battery containers (approximately 3.1m in height)
 1 transformer station (approximately 2m in height)
 4 Medium Voltage (MV) Cabins (approximately 3.1m in height)
 2 Distribution Network Operator (DNO)/Customer Substations (approximately 4m
in height)
 1 welfare container (approximately 2.6m in height)
 fencing and security measures, including five inward facing CCTV cameras at a
height of 4m
 maintenance tracks and a site access gate 
4. Relevant Planning History
4.1 A Proposal of Application Notice (PAN) for this proposed development was submitted
in April 2024 (P/24/0004/PAN) with details provided of pre-application public
consultation events, and confirmation that details of the proposal would be sent to local
elected members.  
4.2 This PAN was followed up by the submission of Planning Application reference
P/24/0970, which was withdrawn by the applicant before a decision was made. 
4.3 This current application represents a resubmission of the earlier withdrawn application
and is promoted under the terms of the extant PAN. 
5. Supporting Information 
5.1.  Several supporting documents have been submitted in support of this application
including:- 
 Planning Statement
 Design and Access Statement
 Pre-Application Consultation Report
112

Page 113

 Landscape and Visual Appraisal (LVA)
 LVA Graphics and Visualisations
 Illustrative Landscape Masterplan
 Preliminary Ecological Assessment
 Flood Risk Assessment and Drainage Strategy
 Preliminary Contamination Risk Assessment Report
 Coal Mining Risk Assessment
 Noise Impact Assessment
 Construction Traffic Management Plan
 Access Appraisal
 Battery Safety Management Report
 Economic Note 
6. Consultations
6.1. Environmental Services – offered no objections and have suggested several
advisory notes.
Response: Noted and these matters could be addressed on the decision notice if the
application were to be approved. 
6.2 Roads, Transportation and Fleet Services – offered no objections, subject to the
inclusion of conditions relating to access provision, the provision of an appropriate
visibility splay, the undertaking of a dilapidation survey and the approval of a Traffic
Management Plan for the construction phase.
Response: Noted.  These matters could be addressed through conditions on the
decision notice if the application were to be approved. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, 3
objections have been received.  Each of these objections raise concerns regarding the
potentially adverse impacts of the development upon Longlands Moss, which lies a
short distance to the west of the site. 
7.2 The above issues are considered in the assessment below.  These letters are available
for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 3 - Biodiversity 
 Policy 11 - Energy 
 Policy 14 - Design, quality and place
 Policy 18 - Infrastructure first
 Policy 26 - Business and industry 
113

Page 114

8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change 
 Policy 5 - Development Management and Placemaking
 Policy 8 - Employment 
 Policy 18 - Renewable Energy 
SLLDP2 Volume 2 Policies 
 Policy DM1 - New Development Design
 Policy RE1 - Renewable Energy 
 Policy ICD2 - Non-Conforming Uses in Core Industrial Areas   
South Lanarkshire Council (SLC) Supporting Planning Guidance 
 Renewable Energy (January 2021) 
9. Guidance
9.1. The following documents set out the Scottish Government’s views, policies and
priorities in relation to energy, sustainability, climate change and related topics, and
they are relevant to the assessment of this application:- 
 Draft Energy Strategy and Just Transition Plan: Delivering a Fair and Secure
Zero Carbon Energy System for Scotland, Scottish Government (2023)
 Update to the Climate Change Plan 2018-2032: Securing a Green Recovery on
a Path to Net Zero, Scottish Government (2020)
 Scottish Government Energy Storage Planning Advice (2013) 
10. Assessment and Discussion
10.1. Introduction
The main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development, its layout, siting and design,
and an assessment of technical matters.  The policies contained within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2 are the
main consideration in this case, together with an assessment of any other material
planning considerations. 
10.2 Principle of Development
In terms of the principle of the development, as the site is located within a designated
Core Industrial and Business Area, Policy 26 – Business and industry of NPF4 and
Policy 8 – Employment of SLLDP2 is applicable.  Policy 26 of NPF4 seeks to
encourage, promote and facilitate business and industry uses within the designated
areas.  It seeks to ensure that there is a suitable range of sites that meet current market
demand for business and industry uses and support development proposals for
business and industry uses where they are compatible with the primary business
function of the area. 
10.3 It is noted that, in this case, the proposal would result in the loss of designated core
business and industry land to a renewable energy use that would not generate
employment on site beyond the initial construction stage.  The site in question would
no longer be available for a business and industry use once developed as a battery
storage facility.  
114

Page 115

10.4 The proposal would not generate any permanent on-site employment and therefore
would not encourage, promote or facilitate business and industry uses nor would it
help to ensure that there is a suitable range of sites that meet market demand for
business and industry uses in designated areas.  As such, the proposals do not comply
with the provisions of Policy 26 of NPF4. 
10.5 In such circumstances proposals are assessed against the provisions of Policy ICD2
- Non-Conforming Uses in Core Industrial Areas which requires all non-business and
industry uses proposed to be sited within Core Industrial Areas to be considered
against the following criteria to determine if an exception to policy 26 can be made:- 
a. The effect the proposal will have on the continuity of the marketable industrial
land supply in terms of quantity, range and quality.
b.  Development for residential use will not be permitted.
c.  The proposal must not undermine the vitality and viability of existing town and
local centres within South Lanarkshire and should follow the sequential
approach as set out in LDP2 Policy 10.
d.  That the development of the site or premises would not adversely affect the
industrial operation, amenity, industrial character or function of the area,
including traffic movement and circulation.
e.  The site or premises has been subject to a marketing appraisal for uses within
classes 4, 5 and 6 to the Council’s satisfaction and has been actively marketed
for these uses for a minimum period of six months.
f.  The site or premises can easily be accessed from main road routes and has
satisfactory access by walking, cycling and public transport.
g.  The infrastructure implications, including the impact on the transport network of
the development are acceptable, or can be mitigated to an acceptable level.
h.  The proposal includes appropriate parking provision for the type of
development.
i.  The development shall have no significant impact on the natural and historic
environment and no adverse impact on the integrity of any Natura 2000 sites. 
The policy also requires proposals for non-conforming uses to be accompanied by a
business plan demonstrating the viability of the business and a justification for locating
in an industrial area. 
10.6 In this instance the proposed development would have an adverse impact in terms of
a) above, as it would result in the loss of a designated site within a core industrial area
to a use that would not generate permanent on-site employment beyond the initial
construction phase.  In addition, South Lanarkshire Council appointed property
consultants Ryden to provide a suite of employment land and property market reports
for the area and four specific locality reports including one focused on East Kilbride. 
The report found that all areas of South Lanarkshire have very limited industrial
availability.  East Kilbride reflects this with only a 2.8% floorspace availability rate
(Ryden May, 2024).  The site is located in one of East Kilbride’s more modern industrial
areas where demand tends to be highest.  The report states that at this low level of
vacancy, occupiers may experience very limited choice of premises, while demand for
serviced plots continues against a critically low supply.  The loss of this designated
site to a non-employment use would further adversely impact on the already limited
availability of industrial land within the town. 
10.7 Following the withdrawal of the previous application the applicant has prepared an
Economic Note to support the applicant’s contention that the loss of this area of
allocated business/employment land will have no significant adverse impacts in
relation to the application of Policies 8 and ICD2.  It states that the application site is
115

Page 116

currently on the market for sale or rent and has been for some time and therefore it is
not anticipated that the proposal will have a detrimental impact on the continuity of the
marketable land due to the lack of demand and interest in this site at this location
within East Kilbride.  It will result in a small amount of employment land being taken
from a Core Industrial and Business Area.  Whilst the terms of the submitted Economic
Note are noted, it is not considered that it provides sufficient evidence to support a
departure from the terms of the local development plan. 
10.8 Overall, it is not considered that there is appropriate justification in respect of the
proposed siting of the battery storage facility at this designated core business and
industry location, particularly given the identified shortage of industrial land within East
Kilbride.  As a result, the proposals as submitted do not comply with the provisions of
Policy ICD2.  It is concluded that the proposals do not represent an appropriate
development at this location and fail to comply with Policy 8 of the adopted plan. 
10.9 With regards to energy policy, NPF4 Policy 11 supports development proposals for all
forms of renewable, low-carbon and zero emissions technologies including wind
farms, enabling works and energy storage.  Proposals will only be supported where
they maximise net economic impact, including local and community socio-economic
benefits such as employment.  Project design and mitigation should address matters
including the impact upon amenity, the environment, biodiversity, road networks and
similar matters. 
10.10 NPF4 Policy 18 – Infrastructure first supports development proposals which provide
infrastructure in line with that identified necessary in local development plans,
however, the impacts of development proposals on infrastructure should be mitigated
and addressed where applicable.  Scottish Government Energy Storage Planning
Advice (2013) suggests that authorities should consider whether sites within existing
industrial land allocations or brownfield land are suitable for energy storage.  Given its
core industrial location in addition to the severely limited industrial land availability
within East Kilbride and the failure of the proposal to comply with the relevant policies
of the adopted Local Development Plan as outlined above, it has been determined
that the application site is not suitable for an energy storage use. 
10.11 Council policy regarding renewable energy as set out in Policies 18 and RE1 of the
SLLDP2 and in the Council’s Renewable Energy Supporting Planning Guidance
(2021) recognise that BESS systems can be co-located alongside wind or solar farms
in the countryside, or in urban areas close to grid supply points.  In this case the East
Kilbride South substation is 680m to the northeast of the site.  Proposals will be
assessed on their merits against the relevant policies of the development plan and any
relevant criteria in the renewable energy assessment checklist.  It is recognised that
energy storage is an important part of the energy network, and that the Scottish
Governments Draft Energy Strategy and Just Transition Plan supports a ‘range of
technologies which provide sufficient generation and interconnection to meet energy
demand’, including battery storage.  It is also recognised that whilst the generation of
electricity from batteries is not in itself a renewable source of energy, Scottish Ministers
have previously regarded some large BESS developments as essential infrastructure
due to their provision of energy storage, and the added flexibility and resilience they
provide for the wider electricity network. 
10.12 On balance, it is considered that the provision of this 20MW battery energy storage
facility would not be viewed as essential infrastructure which would require to be
located within a designated Core Business and Industry Area.  In this respect, whilst
the principle of such storage technology is supported by the Scottish Government and
by the Council, there is no specific requirement for this proposal to be sited within a
116

Page 117

designated Core Business and Industry Area, particularly given the existing identified
severely limited availability of such land in the East Kilbride area.  In view of the above,
it is considered that the principle of the development cannot be justified at this Core
Business and Industry location. 
10.13 Climate Change and Biodiversity
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of climate
change.  NPF4 Policy 3 states that development proposals will contribute to the
enhancement of biodiversity, and proposals for national or major development will only
be supported where it can be demonstrated that the proposal will conserve, restore
and enhance biodiversity.  In this case it has been demonstrated that the development
would not adversely impact on biodiversity interests and there are no specific concerns
regarding climate change issues associated with the proposal in this instance. 
Concerns have been raised by objectors about the impact of the proposal on the
nearby Langlands Moss SSSI.  The ecological appraisal submitted with the application
states that, as the site is located approximately 365m to the east of the SSSI, there is
no hydrological connectivity between them and therefore it is not anticipated that the
proposed works will impact the designated site. 
10.14 Layout, Siting and Design
In terms of the design of the proposal, the relevant policy of NPF4 to be considered is
Policy 14 – Design, quality and place.  This policy requires development proposals to
be designed to improve the quality of an area and supports proposals where they are
consistent with the six qualities of successful places; healthy, pleasant, connected,
distinctive, sustainable, and adaptable.  SLLDP2 Policies 5 – Development
Management and Placemaking and DM1 – New Development Design state that
development proposals should take account of and be integrated within the local
context and built form.  Proposals should be of a high quality, of either traditional or
contemporary innovative design and shall make use of appropriate materials which
respect and reinforce local character and identity.  New development should also have
no significant adverse impacts on the local community.  Given the business and
industry location of the application site, it is not considered that the proposals would
appear significantly out of place in visual terms.  However, as noted elsewhere in the
report, the impact of the proposed development on the marketable industrial land
supply in terms of quantity, range and quality is considered to render the principle of
the development unacceptable and this is considered to outweigh considerations
regarding layout, siting and design in this case. 
10.15 Conclusion
Following a detailed assessment of this proposal, it is considered that whilst policy
recognises the need to support the wider energy network through the development of
Battery Energy Storage Systems, such proposals should maximise net economic
impact, including local and community socio-economic benefits such as employment. 
In this instance, appropriate justification has not been provided for the siting of this
proposal within a designated Core Industrial and Business Area and, particularly given
the severely limited availability of such land within the East Kilbride area, it is
considered that the proposed development would significantly adversely affect the
marketable industrial land supply in terms of quantity, range and quality in this case. 
It is therefore considered that the proposal fails to comply with the relevant policies of
the development plan, and it is recommended that planning consent is refused. 
117

Page 118

11. Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 8 - Employment of the South Lanarkshire
Local Development Plan 2 (2021) as it would result in the loss of a site designated as
Core Industrial/Business land to a non-employment use and does not meet the criteria
in respect of non-conforming uses as set out in Policy ICD2 (Non-conforming Uses in
Core Industrial/Business Areas) of the plan. 
02. The proposal would be contrary to Policy ICD2 - Non-conforming Uses in Core
Industrial/Business Areas of the South Lanarkshire Local Development Plan 2 (2021)
as it would adversely affect the marketable industrial land supply in terms of quantity,
range and quality and it has not been satisfactorily demonstrated that the site has been
subject to a marketing appraisal for uses within Classes 4, 5 and 6 to the Council's
satisfaction. 
03. The proposal would be contrary to Policy 18 - Renewable Energy of the South
Lanarkshire Local Development Plan 2 (2021) as, whilst the principle of this form of
development is generally supported, the specific proposal does not accord with the
other relevant policies in the development plan, specifically in relation to its Core
Business/Industry land use location and impact upon core business industry land
supply. 
04. The proposal would be contrary to Policy RE1 - Renewable energy of the South
Lanarkshire Local Development Plan 2 (2021) as the proposal would have an adverse
economic impact given its location within a designated Core Industrial/Business land
use location and sufficient justification in terms of economic benefit to the area has not
been satisfactorily provided, outside of temporary, short term economic activity
associated with the construction of the facility.  As such, the proposal fails to
satisfactorily take into account the considerations, criteria and guidance contained
within the Supporting Planning Guidance on Renewable Energy (January 2021), as
well as the other relevant policies in the South Lanarkshire Local Development Plan 2
(2021). 
05. The proposal would be contrary to Policy 11 - Energy of National Planning Framework
4 (2023) as, whilst the principle of this form of development is generally supported, the
specific location of this proposal would have a significant adverse impact on the
function of a site that is designated for employment uses and, as such, does not
maximise socio-economic benefits due to its location, lack of employment
opportunities and direct economic benefit to the community. 
06. The proposal would be contrary to Policy 26 - Business and Industry of National
Planning Framework 4 (2023) as it would result in the loss of designated employment
land to non-employment use and, as such, would not be compatible with the primary
business function of the area. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025  
118

Page 119

Background Papers
Further information relating to the application can be found online:- 
https://publicaccess.southlanarkshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=SU6UJ5OPLB600 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
119

Page 120

120

Page 121

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0432
Proposal:  Change of use of dwellinghouse (Class 9) to children's residential
care home to accommodate 4 children (Class 8 residential institution)
Site Address:  36 Wellhall Road
Hamilton
ML3 9BL
Applicant:  Mrs Helena and Mr Kenneth Simpson
Agent:  None
Ward:  17 - Hamilton North and East
Application Type:  Full Planning Permission
Advert Date:  N/A
Development Plan
Compliance: 
Yes 
Departures:  N/A
Recommendation:  Grant subject to condition
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
14
121

Page 122

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee under the
South Lanarkshire Council Scheme of Delegation as it has received more than 5
objections. 
2. Site Description
2.1. This application relates to a one and a half storey house with a central dormer
providing bedroom accommodation in the roof space in an established residential area
of Hamilton. 
2.2. The property has garden ground to the front and rear, with most of the front area mono-
blocked to provide a large driveway that could accommodate approximately six cars. 
The adjacent properties are the same size and style and to the rear there are two
semi-detached properties, also of a similar height and design.  The property is
opposite the entrance to Hiltonbank Street. 
3. Description of Proposed Development
3.1. Permission is sought to change the use of the house from residential (class 9) to a
children's residential care home (Class 8).  The house would accommodate 4 children
(up to, and including, age 21) who require trauma-informed care.  The care would be
provided by a small team of trained staff.  The home would be staffed by six care
workers and supported by a manager and external therapist when required.  The six
staff would work on a rotational basis, with two workers on duty per shift, to provide
continuous support. 
3.2. The application is for change of use only and therefore there will be no changes or
alterations to the external appearance of the building or garden. 
4. Relevant Planning History
4.1. HM/17/0302 - Erection of extensions and alterations to dwellinghouse including
decking.  Approved 1 August 2017. 
4.2. HM/17/0418 - Erection of extensions and alterations to dwellinghouse including
decking (amendment to HM/17/0302).  Approved 28 September 2017. 
5. Supporting Information 
5.1. Business Statement - this outlines how the proposed children’s home will operate,
including the number of children, the number of staff and shifts, the qualifications of
those in charge along with details of the parking provision. 
6. Consultations
6.1. Environmental Services - No objections, subject to informatives on health and safety,
food safety and nuisance noise.
Response: Noted.  Should planning permission be approved an appropriate
informative will be attached to any decision issued. 
6.2. Care Inspectorate - No objection to the principle of the change of use.  They advise
that some internal alterations or reconfiguration may be required in order to meet their
Care Homes for Children and Young People Design Guide.  Any alterations required
would be discussed with the applicant as part of the Care Inspectorate’s assessment
of the proposed Children’s Home.
Response: Noted. 
122

Page 123

7.   Representations
7.1. Following the statutory period of neighbour notification, 59 individual letters of
representation (including one with a petition with 55 signatures) were received from
residents of the surrounding streets objecting to the application.  The issues raised are
summarised as follows:-
 Inappropriate change of use given it is a residential area and this proposal is
essentially a business.
 Noise and disturbance from antisocial behaviour will negatively impact on
neighbouring properties and may also make residents feel unsafe.
 Increased vehicles to the property will cause traffic congestion on an already
busy road.
 Increased vehicles, including delivery vans, will also create parking issues.
 Lack of community notification and consultation is underhand and everyone in
the area should have been made aware of the proposal, not just immediate
neighbours.
 Loss of privacy to neighbouring properties from increased people in the house.
 Suitability of the property in terms of privacy and internal layout.
 Ensuring the staff have adequate qualifications and training.
 Title deeds for properties in this street state that the houses can only be used
for family homes, not businesses.
 This type of development will negatively impact on local property values.
7.2. The above issues are considered in the assessment below and full copies are
available to view on the planning portal.
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
Policy 1 - Tackling the climate and nature crises 
Policy 2 - Climate mitigation and adaptation 
Policy 13 - Sustainable transport 
Policy 14 - Design, quality and place 
Policy 15 - Local living and 20 minute neighbourhoods 
Policy 23 - Health and safety 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies 
Policy 2 - Climate Change 
Policy 3 – General Urban Areas and Settlements 
Policy 5 - Development Management and Placemaking 
123

Page 124

SLLDP2 Volume 2 Policies 
Policy DM7 – Demolition and Redevelopment for Residential Use 
9.   Guidance
9.1. None applicable. 
10.   Assessment and Discussion
10.1. Principle of Development
The site is located within the general urban area where Policy 3 of SLLDP2 applies. 
This policy looks to ensure that development proposals make a positive contribution
to the character and appearance of the environment in which they are located, taking
account of, and being integrated with, the local context and built form.   
10.2. Proposals for uses that are ancillary to residential areas will be assessed on their
merits, with particular regard to their effect on the amenity of the area.  Whilst the
change of use will result in a business, the care facility proposed at this location seeks
to give young people somewhere to live that is as close to a home environment as
possible and close to local amenities for the young people to integrate with a
community.  In essence, the house will still be a residential home just not for a
stereotypical “family”.  It is therefore considered that the principle of the development
is acceptable. 
10.3. Climate Change
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP seek to promote developments that
address the global climate emergency and nature crisis.  All developments should aim
to minimise and mitigate the effects of climate change.  Given the scale and nature of
the proposed development, it is not considered that any action is required within the
context of the development management process. 
10.4. Layout, Siting and Design
SLLDP2 Policy 5 - Development Management and Placemaking seeks to ensure that
development proposals take account of and are integrated within the local context and
built form and should have no unacceptable significant adverse impact on the amenity
of neighbouring properties.  In this instance, noise, privacy and parking have been
highlighted as the main amenity issues concerning local residents and these aspects
are addressed below.  However, in general it is not considered that the proposal will
result in an unacceptable significant adverse impact on the immediate neighbours or
wider locality. 
10.5. Noise and Nuisance
Neighbours have expressed concerns regarding potential noise, nuisance and
antisocial behaviour from the proposed children’s home, particularly late at night with
older children coming and going and during shift changes.  They have stated that many
of the neighbours are elderly, young children and vulnerable. 
10.6. The applicant has advised that the children placed in the home will have curfews and
rules to adhere to.  Children playing in a garden, a party, teenagers arguing with
parents can all create additional noise in any typical family home, and it is not
anticipated that the children’s home will create any significant increase in noise above
what is generally considered acceptable in a residential area.  An informative on
nuisance noise will be attached to any grant of consent, at the request of
Environmental Services and, as such, they will investigate if there are any future
complaints over noise or anti-social behaviour from the operation of the business.  It
is not anticipated that the development is likely to give rise to any unacceptable noise
or disturbance. 
124

Page 125

10.7. Loss of Privacy
There is a concern that the increased number of people in the house and using the
garden will result in overlooking and loss of privacy of neighbouring properties and
gardens.  It is accepted that there is a degree of mutual overlooking in all residential
areas, and it is not considered that the change of use will exacerbate this.  Additionally,
the garden is enclosed with a timber boundary fence which provides a screen between
properties.  It is considered the development will not increase overlooking or loss of
privacy unacceptably. 
10.8. Parking and Road Safety
Several objections raise concerns over whether the property has sufficient car parking
and that the increase in people attending the site due to staff shift changes, visiting
family or additional therapists, will cause traffic congestion and road safety issues. 
Wellhall Road is a wide, two-lane road with pavements that can be busy at peak times
of the day with regular vehicle movements. 
10.9. The site has a monoblocked front garden that could provide car parking for up to 6
cars and there will be 2 members of staff on duty at any given time throughout the day. 
It is considered that there is sufficient off-street parking for those on shift and for the
additional cars associated with shift changes or other visitors.  Additionally, there are
no parking restrictions which prevents on street parking and visitors and delivery
drivers to most of the houses on Wellhall Road will already have to utilise this.  Wellhall
Road is already busy and, whilst it is accepted that the development may increase
traffic coming to the property, it is considered that the scale of the increase will not
have any significant impact on traffic congestion.  Additionally, in terms of pedestrian
safety, it is not considered that the increase in traffic should cause any increased
hazard to pedestrians or cyclists as the visibility for drivers and pedestrians is
acceptable.   
10.10. Community Engagement
Residents living in Wellhall Road and the neighbouring streets have raised concerns
regarding a lack of notification about the application or any form of community
consultation.  Several residents have also requested that there be a hearing for the
proposal.  Neighbour notification was undertaken and appropriate properties notified. 
However, due to the scale and nature of the proposal, it does not meet the
requirements for a community event or a hearing.  Similarly, there was no requirement
for additional consultation to be undertaken with the community prior to the submission
of the planning application. 
10.11. Non Planning Issues 
Concerns have been raised in relation to whether the property is suitably set up
internally for use as a children’s home, that there are already other children’s homes
in the area, the times that children may be returning to the house at night, the staff
ratio and what training staff will have.  These are issues that will be addressed by the
Care Inspectorate as the regulatory body responsible for all care services in Scotland. 
10.12. Several representations have noted that the title deeds of the property do not allow
the house to be used as a business.  However, feu burdens are a legal issue as
opposed to a planning matter. 
125

Page 126

10.13. Neighbours have also stated that they believe a children’s home will negatively impact
on house value.  However, property values are also not a material planning
consideration. 
10.14. Conclusion 
The proposal is considered to be an appropriate form of development within a
residential area.  Whilst there might be a degree of disruption associated with the
development, it is unlikely to be to an unacceptable degree.  Overall, it is
recommended that planning permission is granted. 
11.   Recommendation and Condition
11.1. The Committee is asked to agree the following recommendation:- 
Grant full planning permission subject to the following condition:- 
01. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice.   
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
12.   Reason for Decision
12.1. The proposal complies with Policies 1, 2, 13, 14, 15 and 23 of the National Planning
Framework 4 (adopted 2023) and Policies 2, 3 and 5 of the Local Development Plan
2 (adopted 2021) and will not result in a detrimental impact on surrounding residential
amenity.  There are no other material considerations which would justify the refusal of
planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/25/0432 | Change of use of dwellinghouse (Class 9) to children's residential care home to
accommodate 4 children (Class 8 residential institution) | 36 Wellhall Road Hamilton ML3 9BL 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
126

Page 127

127

Page 128

128

Page 129

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0517
Proposal:  Section 42 application for variation of condition 1 and deletion of
condition 22 of P/22/0349 Planning Permission in Principle
(residential developments with associated landscaping, roads,
neighbourhood centre, community facilities and infrastructure works
(with Environmental Impact Analysis)) to allow for any detailed design
for further approval of matters specified in conditions
Site Address:  Larkhall Community Growth Area
Summerlee Road
Larkhall
Applicant:  Persimmon
Agent:  N/A
Ward:  20 Larkhall
Application Type:  Further application to vary a condition under Section 42 of the Act
Advert Date:  Hamilton Advertiser 29 May 2025 
Development Plan
Compliance: 
Yes 
Departures:  N/A
Recommendation:  Grant subject to conditions
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
15
129

Page 130

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a Major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the South Lanarkshire Council Scheme of
Delegation requires that all major applications are determined by the Planning
Committee. 
2. Site Description
2.1. The application relates to an area of land located at the north-eastern edge of Larkhall. 
The site forms the eastern portion of Larkhall Community Growth Area (CGA) and
extends to approximately 46.66 hectares.  The site is bounded by roads for much of
its extent.  The M74 and A72 corridors lie to the north and east of the site and Merryton
Road bounds the site to the north-west.  Duke Street crosses the site in a north-south
direction, linking the centre of Larkhall to the A72/M74 Junction 7.   
2.2 A large proportion of the site has been developed with the construction of 198
dwellings within Phase 1 of the CGA (HM/16/0198) and Phase 2 of the CGA
(P/19/0362) consisting of 273 approved dwellings is expected to be completed in the
near future. 
3. Description of Proposed Development
3.1. In terms of background information, planning permission in principle was granted for
a residential development with associated landscaping, roads, neighbourhood centre,
community facilities and infrastructure works (with Environmental Impact Assessment)
at the Larkhall Community Growth Area (CGA) on 27 May 2014 (HM/13/0352).  A
section 42 application P/19/0076 to extend the period of compliance was approved in
April 2019.   
3.2. A subsequent Section 42 application to vary condition 1 of planning consent P/19/0076
to extend the time for the submission of further application(s) for the approval of
matters specified in conditions was approved on 21 September 2022 (P/22/0349).  By
varying the condition, the permission in principle was renewed for a further three years
and was due to expire on 21 September 2025.  The current planning application was
validated by the Council on 6 May 2025.  As discussed above, Phase 1 of the CGA is
complete and Phase 2 of the development is partly constructed. 
3.3. In this instance, the application seeks to vary the terms of condition 01 attached to
permission P/22/0349.  The amendment sought is to allow the inclusion of detailed
requirements for approval of matters specified in conditions. 
3.4. Condition 01 of application P/22/0349 states:- That no consent is hereby granted for
any of details shown on the plan: Masterplan Framework (dated 06 August 2013). 
3.5. The applicant has requested that the condition be varied to read:- That no consent is
hereby granted for any of details shown on the plan: Masterplan Framework (dated
06 August 2013).  Along with approval of matters specified in conditions applications
the matters specified in this condition must be submitted to and approved by the
Council as Planning Authority, in accordance with the timescales and other
limitations in section 59 of the Town and Country Planning (Scotland) Act 1997 (as
amended).  These matters are as follows:- 
(a)  the layout of the site, including all roads, footways, parking areas and
open spaces;  
130

Page 131

(b)  the siting, design and external appearance of all building(s) and any
other structures, including plans and elevations showing their
dimensions and type and colour of external materials; 
(c)  detailed cross-sections of existing and proposed ground levels, details
of underbuilding and finished floor levels in relation to a fixed datum,
preferably ordnance datum;
(d)  the design and location of all boundary treatments including walls and
fences; 
(e)  the landscaping proposals for the site, including details of existing trees
and other planting to be retained together with proposals for new
planting specifying number, size and species of all trees and shrubs,
including, where appropriate, the planting of fruit/apple trees; 
(f)  the means of drainage and sewage disposal; and 
(g)  the submission of an updated biodiversity survey.  
3.6. The applicant has also requested the deletion of condition 22 which states: That
notwithstanding the terms of Condition 19 above, if Tile Cottage and its outbuilding are
to be demolished or modified a bat activity survey (dusk and/or dawn survey during
the bat activity season (April - September inclusive) shall be undertaken to determine
whether there is a bat roost present in the buildings.  The bat survey in addition to a
bat protection plan shall be submitted for the consideration and detailed approval of
the Council as Planning Authority in consultation with SNH.  Thereafter, the
recommendations of the approved bat survey and bat protection plan shall be
implemented to the Council's satisfaction. 
3.7. The request to delete condition 22 is due to a Bat Survey concluding that the
demolition of Tile Cottage would not have an adverse impact upon bats and that a Bat
Management Plan was not necessary.  Following on from that report, Tile Cottage was
demolished during Phase 1 of the development. 
4. Relevant Planning History
4.1. Planning Permission in Principle was granted for residential development with
associated landscaping, roads, neighbourhood centre, community facilities and
infrastructure works (with Environmental Impact Assessment) at the Larkhall
Community Growth Area (CGA) on 27 May 2014 (HM/13/0352). 
4.2. Matters specified in conditions HM/16/0198 relating to residential development (Phase
1) was approved 23 August 2016.  Matters specified in conditions HM/16/0421 for
landscaping, play equipment, habitat management, drainage and SUDS in Phase 1
was approved 30 December 2016. 
4.3. Planning Permission HM/17/0013 for Matters specified in condition 12 for provision of
a sewerage scheme, was approved 15 February 2017.  A Section 42 application to
vary condition 1 of planning consent HM/13/0352 to extend the time for the submission
of further application(s) for the approval of matters specified in conditions was
approved on 23 April 2019 (P/19/0076). 
4.4.  Planning Permission P/19/0362 for matters specified in conditions relating to
residential development (Phase 2) was granted on 20 November 2019.  A Section 42
application (P/22/0349) for an extension of the time of Planning Permission P/19/0076
was granted on 21 September 2022. 
131

Page 132

5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
 Bat activity survey
 Letter outlining proposed variation to the wording of the condition. 
6. Consultations
6.1. None 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement for non-
notification of neighbours, 14 objections, 1 support and 1 representation have been
received.  The issues raised are summarised as follows:-   
Amenity
⧫ Loss of amenity green space
⧫ Community and wellbeing
⧫ Incompatible with local character
⧫ Noise and disturbance from kart track
⧫ Important for leisure and recreation
⧫ Impact upon privacy
⧫ Overshadowing/loss of light 
Land Use Concerns 
⧫ The area is already overpopulated 
Impact on Natural and Historic Environment
⧫ Environmental and ecological concerns
⧫ Woodland area being destroyed 
Roads Related Matters
⧫ Impact upon traffic safety
⧫ Traffic generation
⧫ Impact of construction traffic on the existing road network
⧫ Added congestion during peak hours
⧫ Surrounding roads are in a state of disrepair 
Other Matters Raised
⧫ Impact on local infrastructure and services
⧫ Potential for subsidence because of former mine workings
⧫ Culvert and water management
⧫ Construction noise from the development
⧫ Dust and potential debris which could aggravate health conditions
⧫ Impact upon natural drainage
⧫ Larkhall Academy is now at capacity
⧫ Construction will cause mice and rats to migrate into residential areas 
7.2. The above issues are considered in the assessment below.  These letters are
available on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
132

Page 133

8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy and sets
out spatial principles, regional priorities, national developments, and national planning
policy.  The relevant policies are:- 
National Planning Framework 4 Policies 
 Policy 1 Tackling the climate and nature crises
 Policy 2 Climate mitigation and adaptation
 Policy 3 Biodiversity
 Policy 13 Sustainable transport
 Policy 14 Design, quality and place
 Policy 15 Local living and 20 minute neighbourhoods
 Policy 16 Quality homes
 Policy 22 Flood risk and water management 
8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 Spatial Strategy
 Policy 2 Climate Change
 Policy 3 General Urban Areas and Settlements
 Policy 5 Development Management and Placemaking
 Policy 7 Community Infrastructure Assessment
 Policy 11 Housing
 Policy 13 Green Network and Greenspace
 Policy 15 Travel and Transport
 Policy 16 Water Environment and Flooding 
SLLDP2 Volume 2 Policies
 Policy DM1 New Development Design
 Policy SDCC2 Flood risk
 Policy SDCC3 Sustainable Drainage Systems
 Policy SDCC4 Sustainable Transport
 Policy DM15 Water Supply
 Policy NHE18 Walking, Cycling and Riding Routes
 Policy NHE20 Biodiversity 
South Lanarkshire Council (SLC) Supporting Planning Guidance
The Community Infrastructure Assessment Supplementary Guidance (2022) 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Principal of Development
The application site is identified as forming part of the Larkhall Community Growth
Area within the adopted South Lanarkshire Local Development Plan 2.  The site falls
within the settlement boundary of Larkhall and is also identified as a Housing supply
site, as well as being covered by the Green Network.  The relevant policies in SLLDP2
in terms of the assessment of this application are Policy 1 - Spatial Strategy, Policy 2
133

Page 134

– Climate Change, Policy 5 - Development Management and Place Making, Policy 7
- Community Infrastructure Assessment, Policy 11 – Housing, Policy 13 - Green
Network and Greenspace, Policy 15 - Travel and Transport, Policy 16 - Water
Environment and Flooding, Policy DM1 - New Development Design, Policy SDCC2 -
Flood Risk, Policy SDCC3 - Sustainable Drainage Systems, Policy SDCC4 -
Sustainable Transport, Policy DM15 - Water Supply, Policy NHE18 - Walking, cycling
and riding routes and Policy NHE20 - Biodiversity. 
10.2.  Since its adoption in February 2023 there are policies in NPF4 which are relevant to
this proposal.  These are Policies 1 Tackling the climate and nature crises, 2 Climate
mitigation and adaptation, 3 Biodiversity,13 Sustainable transport, 14 Design, quality
and place,15 Local living and 20 minute Neighbourhoods, 16 Quality homes and 22
Flood risk and water management.  Most of the criteria in these policies are replicated
in similar associated policies in the adopted Local Plan.  It is considered that the
proposal complies with the terms of these policies.  There is not a similar Local Policy
to NPF4 Policy 15 – Local living and 20 minute neighbourhoods.  However, the
approved residential area, half of which is nearing completion, lies close to a wide
range of shops, services and public transport routes including a train station.  In view
of this the proposal also complies with NPF4 Policy 15. 
10.3. There have been no material changes to the aims and objectives of the relevant
policies contained within NPF4 and South Lanarkshire Local Development Plan 2 or
the nature of the application following the issue of the original planning permission in
principle (Ref. HM/13/0352).  On this basis, it is considered that the proposal remains
acceptable in terms of adopted Development Plan policies. 
10.4. Given the nature of the application no consultations were undertaken in respect of the
proposal. 
10.5. Response to Objections 
The purpose of the application is to vary the wording of a condition and delete another
attached to Planning Permission in Principle P/22/0349.  The site is within the Larkhall
Community Growth Area, therefore the principle of a residential development in this
location has already been established.  Phase 1 is complete, and Phase 2 is nearing
completion.  The undeveloped areas, Phases 3 and 4, will be subject to further
approval of matters specified in conditions applications covering detailed matters such
as house designs, layout, landscape and habitat management.  On receipt of these
applications neighbour notification will be undertaken and comments received at that
time will be fully considered. 
10.6. Most of the 14 objections received relate to matters of detail (see paragraph 7.1
above).  The application has been submitted solely to revise the wording of condition
1 so that it lists relevant details to be covered by further applications.  The deletion of
condition 22 is justified as a Bat Activity Survey concluded that the demolition of Tile
Cottage would not adversely affect bats.  Since then, the Cottage has been
demolished therefore the relevance of the condition is no longer applicable.   
10.7. The future development of the site will be required to accord with the details set out in
the Larkhall Community Growth Area - Environmental Statement and requires the
submission of updated biodiversity surveys to identify existing habitats and species,
mitigation and enhancement proposals.  Other issues which will be addressed as part
of detailed applications for future phases, include noise assessment, dust mitigation,
drainage assessment, landscape plans and coal mining legacy investigations. 
Appropriately worded conditions are attached to the consent to address these matters. 
134

Page 135

10.8. A requirement of Planning Permission HM/13/0352 was the conclusion of a Section
75 agreement to secure contributions towards nursery, primary and secondary
education, affordable housing and community facilities along with improvements to the
road network and public transportations services.  The terms of the Section75
agreement cover all further applications for this development since the initial consent
was issued. 
10.9. Conclusion 
In summary, it is considered that the proposal complies with NPF4 and SLLDP2
policies and raises no amenity issues or concerns.  The changes to the wording of
condition 01 give clarity on the details that future matters specified in conditions will
have to address.  A Bat Activity Survey established that the demolition of Tile Cottage
would not affect the local bat population.  Since the demolition of Tile Cottage this
condition is no longer applicable and therefore the deletion of the condition is justified. 
In view of the above, the proposed Section 42 application is acceptable, and it is
recommended that planning permission in principle be granted based on the revised
conditions listed. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant planning permission in principle subject to the following conditions:- 
01. That no consent is hereby granted for any details shown on the plan:
Masterplan Framework (dated 06 August 2013).  Along with approval of matters
specified in conditions applications the matters specified in this condition must
be submitted to and approved by the Council as Planning Authority, in
accordance with the timescales and other limitations in section 59 of the Town
and Country Planning (Scotland) Act 1997 (as amended).  These matters are
as follows:- 
(a) the layout of the site, including all roads and associated structures,
footways, parking areas and open spaces;
(b) the siting, design and external appearance of all building(s) and any 
other structures, including plans and elevations showing their
dimensions and type and colour of external materials; 
(c) detailed cross-sections of existing and proposed ground levels, details 
of underbuilding and finished floor levels in relation to a fixed datum,
preferably ordnance datum;
(d) the design and location of all boundary treatments, walls and fences;
(e) the landscaping proposals for the site, including details of existing trees 
and other planting to be retained together with proposals for new planting
specifying number, size and species of all trees and shrubs, including,
where appropriate, the planting of fruit/apple trees;   
(f)  the means of drainage and sewage disposal;   
(g)  updated biodiversity surveys;   
(h) updated flood risk assessment;   
(i)  refuse storage and collection arrangements;   
(j) construction management plan (which shall include a scheme for the 
control and mitigation of dust);   
(k) full details of any equipped play areas;   
(l) a phasing plan; and  
(m) details of a welcome pack for each phase outlining public transport and 
active travel options including links to, and locations of, local services. 
135

Page 136

Reason: To comply with section 59 of the Town and Country Planning
(Scotland) Act 1997 as amended. 
02.  That the future development of the site hereby approved in principle shall
accord with the matters set out within the Larkhall Community Growth Area -
Environmental Statement (Volumes 1 - 4) (August 2013), the terms of which
are hereby approved and which accordingly, forms part of the planning
permission in principle.     
Reason: In order to retain effective planning control. 
03.  That the further application(s) required shall include an updated Noise
Assessment (NA) to determine the impact of road traffic noise on the proposed
development using the principles set out in "Calculation of Road Traffic Noise"
(DoT/Welsh Office, HMSO, 1988) or by a method to be agreed by the Planning
Authority.  The survey shall take cognisance of the Scottish Government
Document: Technical Advice Note Assessment of Noise. 
The survey shall be submitted to and approved by the Council as Planning
Authority and where potential noise disturbance is identified, it shall include a
scheme for protecting the proposed dwellings from road traffic noise.  The
scheme shall ensure that the internal levels with windows closed do not exceed
40 dB daytime (07:00 -23:00) and 35 dB night-time (23:00 - 07:00) and the
external levels do not exceed 55 dB daytime in any garden areas, when
measured as LAeq,T.     
Reason: To minimise noise disturbance. 
04.  That the further application(s) required shall include:-  
(a) a comprehensive site investigation, carried out to the appropriate Phase 
level for the consideration and detailed approval of the Council as
Planning Authority.  The investigation shall be completed in accordance
with advice given in the following:-      
- Planning Advice Note 33 (2000) and Part IIA of the Environmental 
Protection Act 1990 (as inserted by section 57 of the Environment Act 
1995);    
- Contaminated Land Report 11 - 'Model Procedures for the 
Management of Land Contamination (CLR 11)'- issued by DEFRA and 
the Environment Agency;    
- BS 10175:2011 - British Standards Institution 'The Investigation of 
Potentially Contaminated Sites - Code of Practice'.  
(b) If the Phase 1 investigation indicates any potential pollution linkages, a 
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment.  If a Phase 2 investigation is required, then
a risk assessment of all relevant pollution linkages using site specific
assessment criteria will require to be submitted.  
136

Page 137

(c) If the risk assessment identifies any unacceptable risks, a detailed 
remediation strategy will be submitted to and approved in writing by the
Council as Planning Authority.  No works other than investigative works
shall be carried out on site prior to receipt of the Council's written
approval of the remediation plan   
Reason: To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use. 
05.  That the further application(s) required shall include a remediation plan for the
relevant site and/or phase.  
(a) Remediation of the site shall be carried out in accordance with the 
approved remediation plan prior to the proposed development being
brought into use.  Any amendments to the approved remediation plan
shall not be implemented unless approved in writing by the Council as
Planning Authority.  
(b) On completion of the remediation works, the developer shall submit a 
completion report to the Council as Planning Authority, confirming that
the works have been carried out in accordance with the approved
remediation plan and that the works have successfully reduced these
risks to acceptable levels. 
(c) Any previously unsuspected contamination which becomes evident 
during the development of the site shall be brought to the attention of the
Council as Planning Authority within one week or earlier of it being
identified.  A more detailed site investigation to determine the extent and
nature of the contaminant(s) and a site-specific risk assessment of any
associated pollutant linkages, shall then require to be submitted to and
approved in writing by the Council as Planning Authority.   
Reason: To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use. 
06.  That the further application(s) required shall include an Outdoor Access Plan
for the provision of walking, cycling and horse riding for the consideration and
detailed approval of the Council as Planning Authority, comprising:-  
(a) A plan at an appropriate scale indicating the location and alignments of 
all existing formal and informal access routes, paths and tracks within
and across the site and including linkages with adjacent areas;  
(b)  A report detailing the existing condition of those routes;  
(c) An assessment of current levels of use, types of user and purpose of 
trips, together with a reasoned estimate of how this might change as a 
result of the development or otherwise;  
(d) A plan at an appropriate scale indicating the proposed scheme of access 
routes for walkers, cyclists and horse riders [as appropriate] including
linkages with adjacent areas;  
137

Page 138

(e) A statement showing how this scheme complies with the requirements 
of the Disability Discrimination Act 1995;  
(f) Detailed specifications for the construction of all routes, and for all 
associated artefacts and structures such as seating, cycle racks,
lighting, handrails, access controls, signage and interpretation; and     
(g)  A programme for completion and subsequent maintenance.     
No work shall commence on site until the written approval of the Council as 
Planning Authority has been given.     
Reason: To ensure that development makes appropriate provision for outdoor 
access and to achieve the completion and subsequent maintenance of the
access proposals within an appropriate timescale. 
07. That unless otherwise agreed, the developer shall secure the implementation
of an archaeological watching brief, to be carried out by an archaeological
organisation acceptable to the Council as Planning Authority, during all ground
disturbance within each phase of the development.  The retained
archaeological organisation shall be afforded access at all reasonable times
and allowed to record and recover items of interest and finds.  A method
statement for the watching brief will be submitted by the applicant, agreed by
the West of Scotland Archaeology Service, and approved by the Planning
Authority prior to commencement of the watching brief.  The name of the
archaeological organisation retained by the developer shall be given to the
Planning Authority and to the West of Scotland Archaeology Service in writing
not less than 14 days before development commences on each phase of the
development.     
Reason: In order to safeguard any archaeological items of interest or finds. 
08.  That the further application(s) required shall include details of a Bus Service
Strategy and should cover details in respect of:-   
i) plans that detail the roads, cycleways and footways associated with that
particular phase of the development;   
ii) the frequency and routing of new/amended bus services; 
iii) details of bus infrastructure design for that phase of development including
lay-by, shelter (with a power supply), pole and lighting details;     
iv) location/position of bus stops and bus layover; and 
v) a temporary bus turning circle at an appropriate location, at the end of each
phase of the development.     
Reason: These details have not been submitted or approved. 
09.  That in the event that it is determined that any trees with bat roosting potential
are required to be felled, prior to felling, a bat survey (dusk and/or dawn survey
during the bat activity season (April - September inclusive) shall be undertaken
to determine whether there is a bat roost present in the trees.  The bat survey
shall be submitted for the consideration and detailed approval of the Council as
Planning Authority in consultation with NatureScot.  Thereafter, the
recommendations of the approved bat survey shall be implemented to the
Council's satisfaction. 
138

Page 139

Reason: To ensure the protection of existing habitats within the site. 
10. That the mitigation measures as stated in section 5.6 of the Environmental
Statement compiled by Enviro Centre (August 2013) (or any
subsequent/updated report) shall be implemented throughout the construction
and post-construction phases of the development.     
Reason: To ensure the protection of existing habitats within the site. 
11.  That an intrusive ground investigation shall be undertaken supervised by
suitably experienced and qualified consulting engineers and a comprehensive
report shall be submitted for the consideration and detailed approval of the
Council as Planning Authority with the further application(s) required.  The
report shall consider all the relevant geotechnical matters including ground
stability, coal mining legacy issues, mining support, groundwater,
environmental issues and the requirements for structures roads and footpaths. 
The report shall contain recommendations for dealing with any geotechnical
constraints and these shall be included in the design of the development all to
the satisfaction of the Council.   
Reason: In order to retain effective planning control and to ensure that the
ground conditions and associated constraints identified in the EIS are suitably
incorporated into the design of the development. 
12. In the event that the site investigations required under Condition 11 above
confirm the need for remedial works, the required remedial works shall be
undertaken prior to any dwellings being occupied to the Council's satisfaction.     
Reason: To ensure the safety and stability of the proposed development. 
13.  That the further application(s) required shall include an updated Noise
Assessment (NA) to determine the impact of noise from The Go-Kart Race
Track on the proposed development using the principles set out in British
Standard BS 4142:1997 - Method for Rating Industrial Noise affecting Mixed
Residential and Industrial Areas, or a method agreed by the Planning Authority. 
The NA shall be submitted to and approved by the Planning Authority and shall
identify:     
1)  the maximum Rating Levels; and 
2)  the minimum Background Noise Level to which any part of the 
development will be exposed.   
The Background Noise Level for the most noise sensitive period that the source
could operate shall be used for this assessment.  Where the Level of
Significance as described within the Scottish Government Document: 
Technical Advice Note Assessment of Noise, identifies changes in noise as
moderate or greater (assessed with windows open), a scheme for protecting
the proposed dwelling(s) from industrial / stationary noise shall be submitted to,
and approved by, the Planning Authority.     
Reason: To minimise noise disturbance to adjacent properties. 
139

Page 140

14.  Prior to the occupation of the 191st dwelling, the alterations to the junction of
A72 Lanark Road / M74 Junction 7 southbound off slip and northbound on slip,
which shall include the installation of traffic signals which shall incorporate
queue detection on the on slip, MOVA (Microprocessor Offset Vehicle
Actuated) control and widening of the carriageway on the A72 overbridge.
Junction design to be generally in accordance with Dougall Baillie Associates
Drawing no. 13069-SK-06 and to be submitted for approval and thereafter
implemented by the applicant to the satisfaction of the Council as Planning and
Roads Authority and in consultation with Transport Scotland and in accordance
with the Design Manual for Roads and Bridges (DMRB).     
Reason: In the interest of public and road safety. 
15.  Prior to the occupation of the 550th dwelling, alterations to the M74 Junction 7
northbound on slip (interim improvement) generally in accordance with Dougall
Baillie Associates Drawing no. 13069-SK-21 shall be submitted for approval
and thereafter implemented by the applicant to the satisfaction of the Council
as Planning and Roads Authority and in consultation with Transport Scotland
and in accordance with the Design Manual for Roads and Bridges (DMRB).     
Reason: In the interest of public and road safety. 
16.  The development shall be restricted to 550 dwellings until such time as an
agreement on the mechanism for the delivery of further upgrades to the M74
northbound on slip and southbound off slip, generally as illustrated on Dougall
Baillie Associates Drawing Numbers 13069-SK-22 and 13069-SK-24, has been
reached between the Council as Planning Authority and/or Transport Scotland
and in accordance with the requirements of the Design Manual for Roads and
Bridges (DMRB).  The agreed mechanism shall define all aspects of phasing,
calculating contribution levels, procurement and delivery for the identified
works. 
Reason: In the interest of public and road safety. 
12. Reason for Decision
12.1. The proposal raises no amenity, environmental or infrastructure issues and complies
with Policies 1, 2, 3, 13, 14, 15, 16 and 22 of NPF4 and Policies 1, 2, 5, 7, 11, 13, 15,
16, DM1, SDCC2, SDCC3, SDCC4, DM15, NHE18 and NHE20 of the adopted South
Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Section 42 application for variation of condition 1 and deletion of condition 22 of P/22/0349
Planning Permission in Principle (residential developments with associated landscaping,
roads, neighbourhood centre, community facilities and infrastructure works (with
Environmental Impact Analysis)) to allow for any detailed design for further approval of
matters specified in conditions.  
140

Page 141

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
141

Page 142

142

Page 143

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0529
Proposal:  Installation of flue to rear elevation of existing building
Site Address:  15 Montgomery Street
East Kilbride
G74 4JS
Applicant:  MHR Pension Trust
Agent:  Stephen Govan, SGA Studio
Ward:  08 East Kilbride Central North
Application Type:  Full Planning Permission
Advert Type:  N/A
Development Plan
Compliance: 
Yes
Departures:  N/A
Recommendation:  Grant subject to conditions
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
16
143

Page 144

1. Reason for Report
1.1. This application must be presented to the Planning Committee for determination as it
has received more than 5 objections, as detailed in paragraph 3.5 (b) of the approved
South Lanarkshire Council Scheme of Delegation 2024. 
2. Site Description
2.1. The application site is an existing C-Listed two storey and attic traditional townhouse
building located on Montgomery Street within the designated local centre and the
Conservation area of East Kilbride Village.  The unit in question is a vacant ground
floor premises, formerly operating as a hairdressing salon. 
3. Description of Proposed Development
3.1. Planning permission is sought for the installation of a flue to the rear elevation of the
existing building.  These changes are primarily related to the installation of a ventilation
system, including the formation of a flue, with no other significant external changes
proposed.  A Listed Building Consent (LBC) application has also been submitted for
the proposal under application number P/25/0711. 
4. Relevant Planning History
4.1. None. 
5. Supporting Information 
The following information was submitted by the applicant in support of the application: 
5.1. Ventilation System Details – This document, submitted while the application was still
under consideration, provides details on the proposed ventilation system operation. 
6. Consultations
6.1. Environmental Services – Have no objections to the proposal subject to the inclusion
of conditions relating to the proposed method of ventilation. 
Response – Noted.  These matters could be addressed through conditions and on the
decision notice if the application were to be approved.  The advisory notes can also
be added as appropriate. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
10 representations have been received (6 objections).  The issues raised are
summarised as follows:- 
 Concerns regarding noise and odours generated by the proposed flue, and their
potential impact on the amenity of nearby residents.
 Concerns regarding the impact of the proposal on the character and appearance
of the listed building.
 Concerns that the development may require a change of use planning
permission, which has not been addressed, and that a dwelling is located within
one metre of the proposed development. 
The above issues will be considered in the assessment below and full copies are
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  
144

Page 145

8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 7 - Historic assets and places
 Policy 14 - Design, quality and place 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change 
 Policy 3 - General Urban Areas and Settlements
 Policy 5 - Development Management and Placemaking 
 Policy 14 - Natural and Historic Environment 
SLLDP2 Volume 2 Policies
 Policy NHE6 - Conservation Areas 
9. Guidance
9.1. None 
10. Assessment and Discussion
10.1. Introduction 
Full planning permission is sought for the installation of a flue to the rear elevation of
an existing building, at 15 Montgomery Street, East Kilbride.  The key issues to be
addressed in the determination of this application include the acceptability in principle
of the proposed development, its design, siting and its impact on residential and visual
amenity and the character and integrity of the Conservation Area and listed building,
as well as an assessment of relevant technical matters.  The policies contained within
National Planning Framework 4 and the South Lanarkshire Local Development Plan
2 are the main considerations in this case, together with an assessment of any other
material planning considerations. 
10.2. Principle of Development
The application site is located within the identified settlement boundary of East
Kilbride.  As such, the proposal is required to be considered against Policy 3 of the
LDP2 which establishes that developments, may be considered acceptable where
they do not have a significant adverse impact upon the amenity and character of the
area.  The site is located in an area which contains a mix of uses and architectural
styles where properties on Montgomery Street are predominantly of commercial use. 
All units within 15 Montgomery Street are owned by the applicant and are in non-
residential use.  In terms of the principle of the development, this application is limited
to external alterations, specifically the installation of a flue on the rear elevation of the
building.  There are no residential properties within five metres from the flue and the
discharge point is above eaves level.  It is therefore considered that the principle of
the flue installation raises no issues in the context of Policy 3 of the LDP2. 
145

Page 146

10.3. Climate Change
NFP4 Policy 1 - Tackling the Climate and Nature Crises and NPF4 Policy 2 - Climate
Mitigation, along with Policy 2 of SLLDP2, seek to ensure that new development
proposals minimise and mitigate the impacts of climate change wherever possible.  In
this case, the proposal involves relatively minor alterations to a currently vacant
building to bring it back into productive use, and it is not expected to result in any
significant impact on the local environment or climate.  As such, the proposal is not
considered to be in conflict with NPF4 Policies 1 and 2, or with SLLDP2 Policy 2. 
10.4. Layout, Siting and Design
Policies 3 and 5 of the SLLDP2 collectively seek to ensure that all new proposals are
appropriately designed and scaled, with no adverse impact on amenity and require to
be well designed and integrated with the local area.  Proposals should have no
significant adverse impacts on the local community and the environment.  Policy 14 of
NPF4 relates to liveable places.  It sets out that all development should be designed
to improve the quality of an area and be consistent with the six qualities of successful
places, including whether the development is connected and sustainable. 
10.5. The proposal involves minor external alterations to accommodate a ventilation system,
with the most notable change being the installation of a wall-mounted flue at the rear
of the building.  Such additions are typical in urban commercial settings and due to the
flue’s scale and positioning, would not appear visually prominent.  No other external
changes are proposed.  Replacement signage may be required and would be subject
to separate advertisement consent, if necessary. 
10.6. Other Issues 
The application site is a category C listed building located within the designated East
Kilbride Village Conservation Area, making its impact on the character of the listed
building and historic streetscape a material consideration.  Policy 7 of NPF4, as well
as Policies 14 and NHE6 of SLLDP2, advise that development proposals in or affecting
the setting of listed buildings and conservation areas will only be supported where the
character and setting is preserved or enhanced.  The proposed external alterations
are minor, limited to the installation of a flue.  This will be positioned at the rear of the
building, attached to the wall and located below the ridge of the existing roof, screened
from public view by existing buildings.  As a result, the proposal is expected to have
minimal visual impact and is considered to preserve the historic character and
appearance of the Conservation Area and does not adversely affect the character of
the listed building.  The proposal is therefore deemed acceptable. 
10.7. It is important to clarify that the change of use from a hairdressing salon (Class 1A) to
a restaurant (Class 3) is not part of this application.  This change is permitted under
Class 1A of the Town and Country Planning (General Permitted Development)
(Scotland) Order 1992, as amended, and therefore does not require formal planning
permission.  This application relates solely to the proposed external alterations to the
building.  Concerns have been raised regarding the proximity of a residential unit
located within one metre of the development.  However, it should be noted that no
residential unit is located within one meter from the application site.  The unit in
question is situated in the neighbouring building and is positioned above the level of
the premises. 
10.8. Technical Matters
With regards to technical considerations, it is noted that the Council’s Environmental
Health Services have no objections to the proposal.  Conditions for a suitable
ventilation system can be included on the decision notice to ensure that the system is
suitable for its use. 
146

Page 147

10.9. Conclusion 
In summary, following a detailed assessment, it is concluded that the proposed
installation of the external flue would not have a significant impact on the residential
or visual amenity of the surrounding area, nor on the character of the listed building or
integrity of the conservation area.  The proposal complies with the relevant policies of
the development plan, and there are no material considerations that would justify
refusal of consent.  Therefore, the application is recommended for approval. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to the following conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.  
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. Before the flue is brought into use, the proposed method of ventilation shall be
operational in accordance with the approved details and thereafter maintained
to the satisfaction of the Council as Planning Authority.  The proposed
development shall not be brought into use until the ventilation systems are
operational in accordance with the approved details. 
All odours, fumes and vapours generated on the premises shall be controlled
by best practicable means to prevent them causing nuisance to occupants of
nearby dwellings or premises. 
The ventilation system shall:- 
a) Incorporate systems to reduce the emission of odours and pollutants and
shall thereafter be maintained as necessary.
b) Be constructed by employing best practical means to minimise noise and
vibration transmission via plant and the building structure. 
Reason: To minimise the risk of nuisance from smells, fumes, vapours and
noise to nearby occupants. 
12. Reason for Decision
12.1. The proposal would have no significant adverse impact on amenity, public safety, the
local environment or the character of the Listed Building and integrity of the
Conservation Area, and complies with the provisions of Policies 1, 2, 7 and 14 of
National Planning Framework 4 (2023) and Policies 2, 3, 5, 14 and NHE6 of the
adopted South Lanarkshire Local Development Plan 2 (2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025  
147

Page 148

Background Papers
Further information relating to the application can be found online:- 
P/25/0529 | Installation of flue to rear elevation of existing building | 15 Montgomery Street
East Kilbride G74 4JS 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
148

Page 149

149

Page 150

150

Page 151

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0711
Proposal:  External alterations associated with erection of a flue to the rear
(Listed Building Consent)
Site Address:  15 Montgomery Street
East Kilbride
G74 4JS
Applicant:  MHR Pension Trust
Agent:  Stephen Govan, SGA Studio
Ward:  08 East Kilbride Central North
Application Type:  Listed Building Application
Advert Type:  Listed Building Consent site notice 27.06.2025
Edinburg Gazette, LBC 25.06.2025
East Kilbride News LBC 25.06.2025
Development Plan
Compliance: 
Yes
Departures:  N/A
Recommendation:  Grant subject to condition
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
17
151

Page 152

1. Reason for Report
1.1. This application must be presented to the Planning Committee for determination as it
has received more than 5 objections, as detailed in paragraph 3.5 (b) of the approved
South Lanarkshire Council Scheme of Delegation 2024. 
2. Site Description
2.1. The application site is an existing C-Listed two storey and attic traditional townhouse
building located on Montgomery Street within the designated local centre and the
Conservation Area of East Kilbride Village.  The unit in question is a vacant ground
floor premises, formerly operating as a hairdressing salon.  The immediate
surrounding area features a mix of uses, including retail units within the same building
and in adjacent properties.  In addition, there are few residential units within
Montgomery Street. 
3. Description of Proposed Development
3.1. Listed building consent is sought for the installation of a flue to the rear elevation of
existing building.  These changes are primarily related to the installation of a ventilation
system, including the formation of a flue, with no other significant external changes
proposed.  A Full Planning Permission application has also been submitted for the
proposal under application number P/25/0529. 
4. Relevant Planning History
4.1. None. 
5. Supporting Information 
5.1. None. 
6. Consultations
6.1. None. 
7. Representations
7.1. Following advertisements of the proposal in the Edinburgh Gazette and East Kilbride
News and a Site Notice display in front of the building, a total of 7 representations
have been received (7 objections).  The issues raised are summarised as follows:- 
 Concerns regarding noise and odours generated by the proposed flue, and their
potential impact on the amenity of nearby residents.
 Concerns regarding the impact of the proposal on the character and appearance
of the listed building and conservation area.
 Concerns that the development may require a change of use planning
permission, which has not been addressed, and that a dwelling is located within
one metre of the proposed development. 
7.2. The above issues will be considered in the assessment below and full copies are
available to view on the planning portal. 
8.  Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  
152

Page 153

8.2. National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 7 - Historic assets and places 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2: 
SLLDP2 Volume 1 Policies
 Policy 14 - Natural and Historic Environment 
SLLDP2 Volume 2 Policies
 Policy NHE3 – Listed Buildings 
9. Guidance
9.1. Historic Environment Scotland - Managing Change in the Historic Environment: - Use
and adaptation of Listed Buildings 
10. Assessment and Discussion
10.1. Listed Building Consent is sought for the installation of a flue to the rear elevation of
existing building, at 15 Montgomery Street, East Kilbride.  The key issue to be
addressed in the determination of this application is the impact of the proposal on the
character of the listed building.  The policies contained within National Planning
Framework 4 and the South Lanarkshire Local Development Plan 2 are the main
considerations in this case, together with an assessment of any other material
planning considerations. 
10.2. Historic Assets
Policy 7 Historic assets and places of NPF4 states that development proposals for the
alteration of a listed building will only be supported where they preserve its character,
special architectural or historic interest and setting.  Policy 14 Natural and Historic
Environment of the SLLDP2 also seeks to protect important natural and historic sites
and advises that development affecting a listed building must accord with specific
guidance relating to listed buildings in Policy NHE3 of the SLLDP2.  Policy NHE3,
Listed Buildings, states that the layout, design, materials, scale, siting and use of any
development shall be sensitive to, and respect the character and appearance of, the
listed building and its setting.  In terms of guidance, Historic Environment Scotland -
Managing Change in the Historic Environment: - Use and adaptation of Listed
Buildings, advises that the proposal would be considered as minimal intervention. 
10.3. The application site is a category C listed building located within the designated East
Kilbride Village Conservation Area.  The proposal involves minor external alterations
to accommodate a ventilation system, with the most notable change being the
installation of a wall-mounted flue at the rear of the building.  This will be positioned at
the rear of the building, attached to the wall and located below the ridge of the existing
roof, screened from public view by existing buildings.  Such additions are typical in
urban commercial settings and due to the flue’s scale and positioning, would not
appear visually prominent.  No other external changes are proposed.  As a result, the
153

Page 154

proposal is expected to have minimal visual impact and is considered to preserve the
historic character and appearance of the Conservation Area and does not adversely
affect the character of the listed building.  The proposal is therefore deemed
acceptable. 
10.4. Other Issues
It is important to clarify that the change of use from a hairdressing salon (Class 1A) to
a restaurant (Class 3) is not part of this application.  This change is permitted under
Class 1A of the Town and Country Planning (General Permitted Development)
(Scotland) Order 1992, as amended, and therefore does not require formal planning
permission.  This application relates solely to the proposed external alterations to the
building and its impact on the character and appearance of the C listed building. 
10.5. Conclusion 
In summary, following a detailed assessment, it is concluded that the proposed
installation of the external flue would not have a significant impact on the character of
the listed building.  The proposal complies with the relevant policies of the
development plan, and there are no material considerations that would justify refusal
of consent.  Therefore, the application is recommended for approval. 
11. Recommendation and Condition
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to the following condition:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice. 
Reason: To comply with Section 16(1) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 (as amended). 
12. Reason for Decision
12.1. The proposal would have no significant adverse impact on the character of the Listed
Building and complies with the provisions of Policy 7 of National Planning Framework
4 (2023), and Policies 14 and NHE3 of the adopted South Lanarkshire Local
Development Plan 2 (2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/25/0711 | External alterations associated with erection of a flue to the rear (Listed Building
Consent) | 15 Montgomery Street East Kilbride G74 4JS 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
154

Page 155

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk  
155

Page 156

156

Page 157

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0555
Proposal:  Installation of a Battery Energy Storage System (BESS) with a capacity
of up to 30MW and associated infrastructure 
Site Address:  Land at Langlands Gate
East Kilbride
G75 0ZY
Applicant:  Advanced Grid Solutions 
Agent:  Sustainability Unlimited
Ward:  5 – Avondale and Stonehouse
Application Type:  Full Planning Permission
Advert Date:  East Kilbride News - 4 June 2025
Development Plan
Compliance:
No 
Departures:  Yes
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
18
157

Page 158

1. Reason for Report
1.1. This application is being presented to Committee as it constitutes a Major planning
application under The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009 and the Scheme of Delegation requires that all major
applications are determined by the Planning Committee. 
2. Site Description
2.1 The application site, which extends to some 0.5ha in area, is located to the west side
of Langlands Drive and lies within the general boundary of the wider Kelvin South
Business Park. 
2.2 The site is bounded to the north and south by existing industrial premises, to the east
by Langlands Drive and thereafter further existing industrial premises and to the west
by open ground which extends westwards towards Langlands Moss. 
3. Description of Proposed Development
3.1. The proposal is for the formation of a Battery Energy Storage System (BESS) facility
with a capacity of up to 30MW, and for the installation of associated infrastructure. 
The facility would store electricity and release it back into the grid when there is
demand.  A vehicular access is proposed to be formed to the site from Langlands
Drive.  The battery units would be enclosed within BESS containers, similar in
appearance to shipping containers. 
3.2 The proposed development would comprise of:- 
 16 battery containers and associated invertor units
 2 sub-station buildings (including one for the Distribution Network Operator)
 Transformer station
 Water tank
 Security fencing with associated CCTV 
4. Relevant Planning History
4.1 Application reference P/21/0063 for the erection of a Class 4 Industrial Unit with
associated car-parking was granted on 12 May 2021. 
4.2 An Environmental Impact Assessment (EIA) Screening Request for the erection of a
16.5MW BESS development was submitted under application reference P/23/1496.  It
was determined that the development concerned would not constitute EIA
development. 
4.3 A Proposal of Application Notice P/25/0004/PAN was submitted in respect of the
construction of a BESS facility setting out the way in which statutory pre-application
consultation would be carried out.  The PAN was approved on 6 March 2025.  The
current application relates to the above noted PAN submission. 
5. Supporting Information 
5.1.  Several supporting documents have been submitted in support of this application
including:- 
 Planning Statement
 Industrial, Business and Employment Assessment
 Lifecycle Carbon Assessment
 Outline Fire Risk Management Plan
 Landscape and Visual Impact Assessment (LVIA)
 Ecological Assessment
158

Page 159

 Cultural Heritage Impact Assessment
 Flood Risk Assessment and Drainage Impact Assessment
 Construction Traffic Management Plan
 Noise Impact Assessment
 Outline Construction Management Plan 
6. Consultations
6.1. Environmental Services – offered no objections and have suggested several
conditions.
Response: Noted and these matters could be addressed on the decision notice if the
application were to be approved. 
6.2 Roads, Transportation and Fleet Services – object to the proposed development
for the following reasons – 
 The Figure showing the proposed access does not show the interaction
between the access track and the car park / access of P/21/0063
 The Swept Path Analysis shows the vehicle will travel out with the red line
boundary.  The applicant should also use the standard (6 axle) max legal
length articulated vehicle profile within Autotrack.
 The proposed construction compound does not appear to have sufficient
space for staff parking or to allow HGV’s to turn
Response: Whilst the terms of this response are noted, roads related matters are not
considered to be a determining issue in respect of the assessment of this application
and, as such, the applicant has not been asked to address these issues of concern. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, no
objections to the proposed development have been received. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation 
 Policy 3 - Biodiversity 
 Policy 11 - Energy 
 Policy 14 - Design, quality and place
 Policy 18 - Infrastructure first
 Policy 26 - Business and industry 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
159

Page 160

SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change 
 Policy 5 - Development Management and Placemaking
 Policy 8 - Employment 
 Policy 18 - Renewable Energy 
SLLDP2 Volume 2 Policies 
 Policy DM1 - New Development Design
 Policy RE1 - Renewable Energy 
 Policy ICD2 - Non-Conforming Uses in Core Industrial Areas   
South Lanarkshire Council (SLC) Supporting Planning Guidance 
 Renewable Energy (January 2021) 
9. Guidance
9.1. The following documents set out the Scottish Governments views, policies and
priorities in relation to energy, sustainability, climate change and related topics, and
they are relevant to the assessment of this application:- 
  Draft Energy Strategy and Just Transition Plan: Delivering a Fair and Secure
Zero Carbon Energy System for Scotland, Scottish Government (2023)
  Update to the Climate Change Plan 2018-2032: Securing a Green Recovery on
a Path to Net Zero, Scottish Government (2020)
  Scottish Government Energy Storage Planning Advice (2013) 
10. Assessment and Discussion
10.1. Introduction
The main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development, its layout, siting and design,
and an assessment of technical matters.  The policies contained within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2 are the
main consideration in this case, together with an assessment of any other material
planning considerations. 
10.2 Principle of Development
In terms of the principle of the development, as the site is located within a designated
Core Industrial and Business Area, Policy 26 – Business and industry of NPF4 and
Policy 8 – Employment of SLLDP2 is applicable.  Policy 26 of NPF4 seeks to
encourage, promote and facilitate business and industry uses in designated areas.  It
seeks to ensure that there is a suitable range of sites that meet current market demand
for business and industry uses and support development proposals for business and
industry uses where they are compatible with the primary business function of the
area. 
10.3 It is noted that, in this case, the proposal would result in the loss of designated core
business and industry land to a renewable energy use that would not generate any
meaningful employment on site beyond the initial construction stage.  The site in
question would no longer be available for a business and industry use once developed
as a battery storage facility. 
160

Page 161

10.4 The proposal would not generate any permanent on-site employment and as a result
would not encourage, promote or facilitate business and industry uses nor help to
ensure that there is a suitable range of sites that meet market demand for business
and industry uses in designated areas.  As such, the proposals do not comply with the
provisions of Policy 26 of NPF4. 
10.5 In these circumstances Policy ICD2 - Non-Conforming Uses in Core Industrial Areas.
Policy ICD2 is applied to assess whether an exception to policy 26 can be made
against the following criteria:- 
a. The effect the proposal will have on the continuity of the marketable industrial
land supply in terms of quantity, range and quality.
b.  Development for residential use will not be permitted.
c.  The proposal must not undermine the vitality and viability of existing town and
local centres within South Lanarkshire and should follow the sequential
approach as set out in LDP2 Policy 10.
d.  That the development of the site or premises would not adversely affect the
industrial operation, amenity, industrial character or function of the area,
including traffic movement and circulation.
e.  The site or premises has been subject to a marketing appraisal for uses within
classes 4, 5 and 6 to the Council’s satisfaction and has been actively marketed
for these uses for a minimum period of six months.
f.  The site or premises can easily be accessed from main road routes and has
satisfactory access by walking, cycling and public transport.
g.  The infrastructure implications, including the impact on the transport network of
the development are acceptable, or can be mitigated to an acceptable level.
h.  The proposal includes appropriate parking provision for the type of
development.
i.  The development shall have no significant impact on the natural and historic
environment and no adverse impact on the integrity of any Natura 2000 sites. 
The policy also requires proposals for non-conforming uses to be accompanied by a
business plan demonstrating the viability of the business and a justification for locating
in an industrial area. 
10.6 In this instance, the proposed development would have an adverse impact in terms of
a) above, as it would result in the loss of a designated site within a core industrial area
to a use that would not generate permanent on-site employment beyond the initial
construction phase.  In addition, this position is reinforced by the outcome of a land
and property market report prepared by property consultants Ryden LLP.  The report
found that all areas of South Lanarkshire have very limited industrial availability.  East
Kilbride reflects this with only a 2.8% floorspace availability rate (Ryden May, 2024).
The site is located in one of East Kilbride’s more modern industrial areas where
demand tends to be highest.  The report states that at this low level of vacancy,
occupiers may experience very limited choice of premises, while demand for serviced
plots continues against a critically low supply.  The loss of this designated site to a
non-employment use would further adversely impact on the already limited availability
of industrial land within the town. 
10.7 The applicants submitted an Industrial, Business and Employment Assessment in
support of the application.  It states that the site has been marketed over several years
with no demand shown for class 4, 5 and 6 uses.  In addition, it includes a business
plan showing the proposal would result in the delivery of a regulated grid service which
would be commercially viable.  It is 1km from the nearest grid supply point.  
161

Page 162

10.8 Overall, it is not considered that there is appropriate justification in respect of the
proposed siting of the battery storage facility at this designated core business and
industry location, particularly given the identified shortage of industrial land within East
Kilbride and it is noted that the proposals as submitted do not comply with the
provisions of Policy ICD2.  As such, the proposals do not represent an appropriate
development at this location and fail to comply with Policy 8 of the adopted plan. 
10.9 With regards to energy policy, NPF4 Policy 11 supports development proposals for all
forms of renewable, low-carbon and zero emissions technologies including wind
farms, enabling works and energy storage.  Proposals will only be supported where
they maximise net economic impact, including local and community socio-economic
benefits such as employment.  Project design and mitigation should address matters
including the impact upon amenity, the environment, biodiversity, road networks and
similar matters.  NPF4 Policy 18 – Infrastructure first supports development proposals
which provide infrastructure in line with that identified necessary in local development
plans, however, the impacts of development proposals on infrastructure should be
mitigated and addressed where applicable.  Scottish Government Energy Storage
Planning Advice (2013) suggests that authorities should consider whether sites within
existing industrial land allocations or brownfield land are suitable for energy storage. 
The application site has been considered in this regard as part of the assessment of
this application, however, given its core industrial location in addition to the severely
limited industrial land availability within East Kilbride as identified in the report of May
2024 by Ryden LLP, together with the failure of the proposal to comply with the
relevant policies of the adopted Local Development Plan as outlined above, it has
been determined that this is not a suitable site for an energy storage use. 
10.10 Council policy regarding renewable energy as set out in Policies 18 and RE1 of the
SLLDP2 and in the Council’s Renewable Energy Supporting Planning Guidance
(2021) recognises that BESS systems can be co-located alongside wind or solar farms
in the countryside, or in urban areas close to grid supply points.  Proposals will be
assessed on their merits against the relevant policies of the development plan and any
relevant criteria in the renewable energy assessment checklist.  It is recognised that
energy storage is an important part of the energy network, and that the Scottish
Governments Draft Energy Strategy and Just Transition Plan supports a ‘range of
technologies which provide sufficient generation and interconnection to meet energy
demand’, including battery storage.  It is also recognised that whilst the generation of
electricity from batteries is not in itself a renewable source of energy, Scottish Ministers
have previously regarded some large BESS developments as essential infrastructure
due to their provision of energy storage, and the added flexibility and resilience they
provide for the wider electricity network. 
10.11 On balance, it is considered that the provision of this 30MW battery energy storage
facility would not be viewed as essential infrastructure which would require to be
located within a designated Core Business and Industry Area.  In this respect, whilst
the principle of such storage technology is supported by the Scottish Government and
by the Council, there is no specific requirement for this proposal to be sited within a
designated Core Business and Industry Area, particularly given the existing identified
severely limited availability of such land in the East Kilbride area.  In view of the above,
it is considered that the principle of the development cannot be justified at this Core
Business and Industry location. 
10.12 Climate Change
Policies 1 and 2 of NPF4 and Policy 2 of SLLDP2 seek to encourage, promote and
facilitate development that addresses the global climate emergency and nature crisis,
and which minimises emissions and adapts to the current and future impacts of climate
162

Page 163

change.  NPF4 Policy 3 states that development proposals will contribute to the
enhancement of biodiversity, and proposals for national or major development will only
be supported where it can be demonstrated that the proposal will conserve, restore
and enhance biodiversity.  In this case it has been demonstrated to the satisfaction of
the Planning Service that the development would not adversely impact on biodiversity
interests and there are no specific concerns regarding climate change issues
associated with the proposal in this instance. 
10.13 Layout, Siting and Design
In terms of the design of the proposal, the relevant policy of NPF4 to be considered is
Policy 14 – Design, quality and place.  This policy requires development proposals to
be designed to improve the quality of an area and supports proposals where they are
consistent with the six qualities of successful places; healthy, pleasant, connected,
distinctive, sustainable, and adaptable.  SLLDP2 Policies 5 – Development
Management and Placemaking and DM1 – New Development Design state that
development proposals should take account of and be integrated within the local
context and built form.  Proposals should be of a high quality, of either traditional or
contemporary innovative design and shall make use of appropriate materials which
respect and reinforce local character and identity.  New development should also have
no significant adverse impacts on the local community.  Given the business and
industry location of the application site, it is not considered that the proposals would
appear significantly out of place in visual terms.  However, as noted elsewhere in the
report, the impact of the proposed development on the marketable industrial land
supply in terms of quantity, range and quality is considered to render the principle of
the development unacceptable and this is considered to outweigh considerations
regarding layout, siting and design in this case. 
10.14 Conclusion
Following a detailed assessment of this proposal, it is considered that whilst policy
recognises the need to support the energy network through the development of Battery
Energy Storage Systems, such proposals should maximise net economic impact,
including local and community socio-economic benefits such as employment.  In this
instance, appropriate justification has not been provided for the siting of this proposal
within a designated Core Industrial and Business Area and, particularly given the
severely limited availability of such land within the East Kilbride area, it is considered
that the proposed development would significantly adversely affect the marketable
industrial land supply in terms of quantity, range and quality in this case.  It is therefore
considered that the proposal fails to comply with the relevant policies of the
development plan, and it is recommended that planning consent is refused. 
11. Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse for the following reasons:- 
01. The proposal would be contrary to Policy 8 - Employment of the South Lanarkshire
Local Development Plan 2 (2021) as it would result in the loss of a site designated as
Core Industrial/Business land to a non-employment use and does not meet the criteria
in respect of non-conforming uses as set out in Policy ICD2 (Non-conforming Uses in
Core Industrial/Business Areas) of the plan.  
163

Page 164

02. The proposal would be contrary to Policy ICD2 - Non-conforming Uses in Core
Industrial/Business Areas of the South Lanarkshire Local Development Plan 2 (2021)
as it would adversely affect the marketable industrial land supply in terms of quantity,
range and quality and it has not been satisfactorily demonstrated that the site has been
subject to a marketing appraisal for uses within Classes 4, 5 and 6 to the Council's
satisfaction. 
03. The proposal would be contrary to Policy 18 - Renewable Energy of the South
Lanarkshire Local Development Plan 2 (2021) as, whilst the principle of this form of
development is generally supported, the specific proposal does not accord with the
other relevant policies in the development plan, specifically in relation to its Core
Business/Industry land use location and impact upon core business industry land
supply. 
04. The proposal would be contrary to Policy RE1 - Renewable energy of the South
Lanarkshire Local Development Plan 2 (2021) as the proposal would have an adverse
economic impact given its location within a designated Core Industrial/Business land
use location and sufficient justification in terms of economic benefit to the area has not
been satisfactorily provided, outside of temporary, short term economic activity
associated with the construction of the facility.  As such, the proposal fails to
satisfactorily take into account the considerations, criteria and guidance contained
within the Supporting Planning Guidance on Renewable Energy (January 2021), as
well as the other relevant policies in the South Lanarkshire Local Development Plan 2
(2021). 
05. The proposal would be contrary to Policy 11 - Energy of National Planning Framework
4 (2023) as, whilst the principle of this form of development is generally supported, the
specific location of this proposal would have a significant adverse impact on the
function of a site that is designated for employment uses and, as such, does not
maximise socio-economic benefits due to its location, lack of employment
opportunities and direct economic benefit to the community. 
06. The proposal would be contrary to Policy 26 - Business and Industry of National
Planning Framework 4 (2023) as it would result in the loss of designated employment
land to non-employment use and, as such, would not be compatible with the primary
business function of the area. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
https://publicaccess.southlanarkshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=SW8X76OPMP500 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies.  
164

Page 165

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
165

Page 166

166

Page 167

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 19 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/25/0598
Proposal:  Change of use of flatted dwelling (sui generis) to short-term let (sui
generis) (retrospective)
Site Address:  Flat 3
2 School Street
Hamilton
ML3 6SD 
Applicant:  Mr Thomas Robertson
Agent:  Euan Pearson
Ward:  19 – Hamilton South
Application Type:  Full Planning Permission
Advert Date:  Hamilton Advertiser 11 June 2025
Development Plan
Compliance: 
No
Departures:  N/A
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
19
167

Page 168

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under the
South Lanarkshire Council Scheme of Delegation.  Councillor Wylie Keatt requested
that the application should be presented to the Planning Committee for consideration
and this was agreed by the Head of Service following consultation with the Chair of
the Planning Committee. 
2. Site Description
2.1. The site relates to a 3-bedroom flat located at 2 School Street, Hamilton in a building
containing 4 flats accessed through a common close with a shared rear garden, and
which forms part of a 2-storey terrace.  The property is 0.8 miles south of the town
centre, bus and train station and 0.2 miles north of Low Waters local centre. 
3. Description of Proposed Development
3.1. The proposal is for a change of use of the flat (sui-generis) to short term let (sui-
generis).  No external changes or other development is proposed.  The application is
retrospective. 
4. Relevant Planning History
4.1. The proposal was recently refused under delegated powers (ref. P/24/0363).  The
current application is a resubmission with additional supporting information.  No appeal
was submitted in relation to the refusal of this application. 
5. Supporting Information 
5.1. A supporting statement has been provided with letters of support from neighbouring
proprietors within the block and a Freedom of Information (FOI) response from the
Council confirming no records of noise complaints. 
6. Consultations
6.1. Environmental Services - No adverse comments or objections. 
Response: Noted 
7. Representations
7.1. No valid third-party representations have been received directly by the Planning
Authority following the statutory period of neighbour notification and consultation. 
However, the application is accompanied by letters of support from each neighbour
within the block. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The development plan comprises the
South Lanarkshire Local Development Plan 2 and National Planning Framework 4. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies
 Policy 1 Tackling the climate and nature crisis
 Policy 2 Climate mitigation and adaptation
 Policy 13 Sustainable transport
 Policy 30 Tourism 
168

Page 169

8.3. South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will, therefore, also
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 Climate Change
 Policy 3 General Urban Areas and Settlements
 Policy 5 Development Management and Placemaking
 Policy 6 Visitor Economy and Tourism 
SLLDP2 Volume 2 Policies
 Policy VET2 Visitor Accommodation 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Principle of Development
Policy 30 of NPF4 makes specific reference to the reuse of existing buildings for short-
term let and sets out that such proposals should not be supported if it would result in
an unacceptable impact on local amenity or the character of an area, and/or that the
loss of residential accommodation is not outweighed by demonstratable local
economic benefits. 
10.2. The Council does not currently consider that the use of residential properties for short-
term lets is at a level to cause concern for the impact on housing stock.  Policy 6 of
the SLLDP2 identifies that visitor accommodation will be supported where it
contributes to the visitor economy and that there are suitable access arrangements. 
Policy VET2 provides further criteria including financial viability, and good visual
integration with the surrounding area. 
10.3. No business plan has been requested per Policy VET2 as there is a low risk of
dereliction if short-term letting proves unviable as the property can easily be returned
to long-term residential.  In any case, the Council’s supporting planning guidance on
making changes to a dwellinghouse advises in Section 6.11, that where planning
permission is approved, a temporary consent for 10 years will be given.  After this
date, and without renewal, the planning permission would lapse, and the use would
revert to residential. 
10.4. Policies 3 and 5 of the SLLDP2 identify that development within settlements may be
considered acceptable if it does not have a significant adverse impact on the amenity
and character of the area, and that all development should take account of, and be
integrated with, the local context and built form. 
10.5. As the proposal makes use of an existing flatted dwelling with no external alterations
proposed, it would not result in a significant material impact on the visual character of
the area or the streetscape.  However, the flat is accessed via a communal stairwell
and shares access to a rear garden.  In suburban flatted developments, the high
turnover of transient residents typically associated with short-term lets is not
considered compatible with the residential character of such properties.  
169

Page 170

10.6. Long-term residents and cognisance of neighbours is typical and expected within
blocks of suburban flats, particularly where there are shared common areas and
facilities (bin stores, garden ground etc.).  The fluctuation of strangers within the
common areas would have an impact on the real and perceived privacy and amenity
of neighbours.  While not all guests would behave in this manner, it is possible that
some may be less mindful of residential amenity or the shared nature of the space,
given the short-term nature of their stay.  It would also be difficult for the Council to
take action against these occurrences as the perpetrator would be a temporary
resident. 
10.7. Therefore, it is considered that the short-term let would have the potential to cause a
significant adverse effect on local amenity by way of privacy impacts and disturbance
to neighbours who share the common areas and facilities.  Consequently, the proposal
is not considered to accord with Policy 30 of NPF4 or Policies 3, 5, and 6 of the
SLLDP2. 
10.8. The supporting information provided in favour of the proposal is noted; however, it
does not alter the assessment that short-term letting in flatted properties with shared
access and amenity space is inappropriate in a suburban residential context.  While
letters of support have been submitted from current neighbours, planning decisions
must consider the long-term protection of residential amenity for both existing and
future occupants.  The absence of recorded noise complaints does not in itself
demonstrate that no disturbance has occurred, particularly given the nature of the use
and the challenge in attributing one-off incidents to individual guests.  Furthermore,
the short-term let use was only established in September 2022 and therefore has a
limited operational history. 
10.9. The Council has consistently taken the view that flats which share communal areas
(such as the application site) are not appropriate locations for short-term let
accommodation due to the real and perceived impacts on privacy, security, and
neighbourly expectations of occupation.  As such, the justification offered does not
outweigh the policy conflict or mitigate the identified amenity impacts. 
10.10. Access 
Policy 13 of NPF4 promotes sustainable modes of transport and intends to reduce car
dominance and supports low/no car developments, particularly in urban locations that
are well-served by sustainable transport modes.  Policy 5 of SLLDP2 requires the
provision of suitable access and parking.  The property does not have dedicated
parking.  There is on-street parking available, however, the flat is adjacent to a bus
stop and a short walk from a local centre and the town centre and train station. 
Consequently, it is considered that the property has a suitable and sustainable level
of access. 
10.11. Conclusion 
In summary, the proposed change of use from flatted dwelling (sui generis) to a short-
term let (sui generis) would result in a detrimental impact upon neighbouring
residential amenity and privacy and is not suitable for the use proposed.  As such, the
proposal is contrary to Policies 3, 5, and 6 of the SLLDP2 and Policy 30 of NPF4.  
170

Page 171

11. Recommendation and Reasons
11.1. The Committee is asked to agree the following recommendation:- 
Refuse Planning Permission for following reasons:- 
01. The proposal is contrary to Policy 3: General Urban Areas and Settlements of the
South Lanarkshire Local Development Plan 2 as it would result in an unacceptable
adverse impact on residential amenity. 
02. The proposal is contrary to Policy 5: Development Management and Placemaking of
the South Lanarkshire Local Development Plan 2 as it would result in an unacceptable
adverse impact on the amenity and privacy of adjacent residential properties. 
03. The proposal is contrary to Policy 6: Visitor Economy and Tourism of the South
Lanarkshire Local Development Plan 2 as it does not comply with other relevant
policies of the plan, particularly with respect to impacts on amenity. 
04. The proposal is contrary to Policy 30: Tourism of National Planning Framework 4 as it
would have an unacceptable impact on local amenity by way of privacy impacts and
disturbance to neighbours who share the building and its common areas. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 11 August 2025 
Background Papers
Further information relating to the application can be found online:- 
P/25/0598 | Change of use of flatted dwelling (sui generis) to short-term let (sui generis)
(retrospective) | Flat 3 2 School Street Hamilton ML3 6SD 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
171

Page 172

172