Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 06 December 2022 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 14 December 2022
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Davie McLachlan (Chair), Martin Lennon (Depute Chair), Joe Fagan (ex officio), John
Bradley, Walter Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry
Convery, Margaret Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer,
Grant Ferguson, Alistair Fulton, Ross Gowland, Geri Gray, Lynsey Hamilton, Ross Lambie,
Richard Lockhart, Julia Marrs, Ian McAllan, Kenny McCreary, Norman Rae, David Shearer 
Substitutes
Robert Brown, Poppy Corbett, Gladys Ferguson-Miller, Martin Hose, Cal Johnston-
Dempsey, Gavin Keatt, Eileen Logan, Monique McAdams, Richard Nelson, Dr Ali Salamati,
Helen Toner, Margaret B Walker, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources Committee
held on 5 October 2022 submitted for approval as a correct record.  (Copy
attached) 
5 - 16 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 23 November 2022 by the Executive Director (Finance and
Corporate Resources) and Executive Director (Housing and Technical
Resources).  (Copy attached) 
17 - 22 
4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
- Housing Revenue Account (HRA)
Joint report dated 23 November 2022 by the Executive Director (Finance and
Corporate Resources) and Executive Director (Housing and Technical
Resources).  (Copy attached) 
23 - 26 
5 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(excl Housing Revenue Account)
Joint report dated 23 November 2022 by the Executive Director (Finance and
Corporate Resources) and Executive Director (Housing and Technical
Resources).  (Copy attached) 
27 - 30 
6 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account)
Joint report dated 23 November 2022 by the Executive Director (Finance and
Corporate Resources) and Executive Director (Housing and Technical
Resources).  (Copy attached) 
31 - 34 
7 Housing and Technical Resources – Workforce Monitoring – August and
September 2022
Joint report dated 23 November 2022 by the Executive Director (Finance and
Corporate Resources) and Executive Director (Housing and Technical
Resources).  (Copy attached) 
35 - 42 
Item(s) for Decision 
8 Acquisition of Houses at Former Phillips Factory Site Wellhall Road,
Hamilton - Section 75 Planning Reference PL/21/1697
Report dated 21 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
43 - 46 
9 Acquisition of Houses at Brackenhill Farm, Hamilton - Section 75 Planning
Reference PL/21/2093
Report dated 21 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
47 - 50
2

Page 3

10  Policy and Strategy Review Schedule
Report dated 22 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
51 - 54 
11  Enhancements to the South Lanarkshire Council Open Market Purchase
Scheme
Report dated 22 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
55 - 60 
12  Notification of Use of Standing Order 37(c) – Lease of 26 Units within the
Former Student Residencies at 2 Barrack Street, Hamilton for the
Purposes of Accommodating Ukrainian Refugees and Resettlement
Report dated 22 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
61 - 64 
13  Disposal of Montrose House, Montrose Crescent, Hamilton ML3 6LB
Report dated 21 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
65 - 68 
14  Disposal of Vacant Domestic Dwelling House at 49 Nevis Avenue,
Hamilton ML3 8UB
Report dated 21 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
69 - 72 
15  Stonefield Pitches, Blantyre – Asset Transfer to Blantyre Victoria Youth
Football Club
Report dated 23 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
73 - 78 
Item(s) for Noting 
16  Update of the Housing and Technical Resources Risk Register and Risk
Control Plan
Report dated 22 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
79 - 98 
17  Annual Report - Mainstreaming Equality and Diversity within Housing and
Technical Resources
Report dated 22 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
99 - 108 
18  Delegated Authority Report – Update
Report dated 21 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
109 - 112 
19  Notification of Contracts Awarded - 1 July to 27 October 2022
Report dated 22 November 2022 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
113 - 120 
Urgent Business 
20  Urgent Business
Any other items of business which the Chair decides are urgent. 
3

Page 4

For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 5 October 2022 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor John Bradley, Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Mathew
Buchanan, Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Allan Falconer, Councillor Grant Ferguson, Councillor Alistair
Fulton, Councillor Ross Gowland, Councillor Geri Gray, Councillor Lynsey Hamilton, Councillor
Gavin Keatt (substitute for Councillor Gerry Convery), Councillor Ross Lambie, Councillor Martin
Lennon (Depute), Councillor Richard Lockhart, Councillor Julia Marrs, Councillor Kenny McCreary,
Councillor Norman Rae, Councillor Dr Ali Salamati (substitute for Councillor Janine Calikes),
Councillor David Shearer, Councillor Helen Toner (substitute for Councillor Ian McAllan) 
Councillors' Apologies:
Councillor Janine Calikes, Councillor Gerry Convery, Councillor Joe Fagan (ex officio), Councillor
Ian McAllan 
Attending:
Finance and Corporate Resources
H Goodwin, Finance Manager (Resources); C Lyon, Administration Officer; E Maxwell, HR Business
Manager; K McLeod, Administration Assistant; L O’Hagan, Finance Manager (Strategy); M M
Wilson, Legal Services Manager; L Wyllie, Administration Assistant
Housing and Technical Resources
A Finnan, Interim Executive Director; S Egan, Area Housing Manager; J Forbes, Head of Property
Services; C Mitchell, Interim Head of Housing Services 
1 Declaration of Interests
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Housing and Technical Resources Committee held on 10
August 2022 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources (excl
Housing Revenue Account (HRA))
A joint report dated 31 August 2022 by the Executive Director (Finance and Corporate
Resources) and Interim Executive Director (Housing and Technical Resources) was submitted
advising of the actual expenditure measured against the revenue budget for the period 1 April to
12 August 2022 for Housing and Technical Resources (excl HRA). 
As at 12 August 2022, there was a breakeven position against the phased budget.
2
5

Page 6

The Committee decided: that the breakeven position as at 12 August 2022 on the
Housing and Technical Resources’ (excl HRA) revenue
budget, as detailed in Appendix A of the report, be noted. 
[Reference: Minutes of 10 August 2022 (Paragraph 4)] 
4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
- Housing Revenue Account (HRA) 
A joint report dated 31 August 2022 by the Executive Director (Finance and Corporate
Resources) and Interim Executive Director (Housing and Technical Resources) was submitted
advising of the actual expenditure measured against the revenue budget for the period 1 April to
12 August for Housing and Technical Resources (HRA). 
As at 12 August 2022, there was a breakeven position against the phased budget. 
The Committee decided: that the breakeven position on the Housing and Technical
Resources’ (HRA) revenue budget, as detailed in Appendix
A of the report, be noted. 
[Reference: Minutes of 10 August 2022 (Paragraph 5)] 
5 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources (excl
Housing Revenue Account (HRA))
A joint report dated 14 September 2022 by the Executive Director (Finance and Corporate
Resources) and Interim Executive Director (Housing and Technical Resources) was submitted
advising of progress on the capital programme for Housing and Technical Resources (excl HRA)
for the period 1 April to 12 August 2022. 
At its meeting on 10 August 2022, this Committee noted that the budget for Housing and
Technical Resources for the financial year 2022/2023 totalled £8.125 million.  Since that
meeting, the Executive Committee at its meetings on 24 August and 21 September 2022, had
also agreed changes to the Housing and Technical Resources’ capital programme, totalling a
net increase of £0.361 million, as detailed in Appendix A to the report.  This took the Housing
and Technical Resources’ programme for 2022/2023 to £8.486 million. 
Anticipated spend to date was £0.544 million and spend to 12 August 2022 amounted to £0.466
million, an underspend of £0.078 million.  This mainly reflected the timing of spend on the multi-
year and multi-project Prioritised Urgent Investment programmes. 
The Committee decided: that the Housing and Technical Resources’ (excl HRA)
capital programme of £8.486 million and expenditure to
date of £0.466 million be noted. 
[Reference: Minutes of 10 August 2022 (Paragraph 8) and Minutes of the Executive Committee
of 24 August 2022 (Paragraph 4) and 21 September 2022 (Paragraph 4)] 
6

Page 7

6 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 6 July 2022 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising of
progress on the capital programme for Housing and Technical Resources (HRA) for the period
1 April to 12 August 2022. 
The Housing capital programme for 2022/2023 totalled £66.361 million and was detailed, along
with the funding sources, at Appendix A to the report.  The budget was based on the revised
capital programme agreed at the Executive Committee on 24 August 2022.  Actual expenditure
to 12 August 2022 was £16.150 million. 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £66.361 million and expenditure to
date of £16.150 million be noted. 
[Reference: Minutes of 10 August 2022 (Paragraph 9) and Minutes of the Executive Committee
of 24 August 2022 (Paragraph 4)] 
Councillor Lambie entered the meeting during this item of business 
7 Housing and Technical Resources – Workforce Monitoring – June and July 2022
A joint report dated 6 September 2022 by the Executive Director (Finance and Corporate
Resources) and Interim Executive Director (Housing and Technical Resources) was submitted
on the following employee information for Housing and Technical Resources for June and July
2022:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 11 June 2022 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 10 August 2022 (Paragraph 10)] 
Councillor Salamati entered the meeting after this item of business 
8 Housing and Technical Resources’ Resource Plan - Quarter 4 Progress Report
2021/2022
A report dated 4 August 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on the Housing and Technical Resource Plan Quarter 4 Progress
Report for 2021/2022 for the period 1 April 2021 to 31 March 2022. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG), which indicated that an action had been completed.
7

Page 8

Details were provided on:- 
 progress made in implementing the priority projects identified in the Resource Plan
2021/2022, as detailed in the Quarter 4 Progress Report, attached as Appendix 2 to the
report
 key achievements made by the Resource to date, as detailed in Section 5.3 of the report
 areas for improvement and associated management actions, as detailed in Section 5.4 of
the report
 measures which had changed from Quarter 2 to Quarter 4, as detailed in Appendix 3 to the
report 
Officers responded to members’ questions on various aspects of the report. 
In response to a member’s request for further information to be added to the key achievements
to included monetary values as well as percentages and days, the Interim Head of Housing
Services agreed to provide this information and respond to the member. 
The Committee decided: 
(1) that the Quarter 4 Progress Report for 2021/2022, as summarised in paragraph 5.2 and
attached as Appendix 2 of the report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in paragraph 5.3 of
the report, be noted; 
(3) that the areas for improvement and associated management actions, as detailed in
paragraph 5.4 of the report, be noted; and 
(4) that the additional scrutiny of changes in BRAG status between Quarter 2 and Quarter 4,
as summarised at paragraph 5.5 and detailed in Appendix 3 of the report, be noted. 
[Reference:  Minutes of 29 September 2021 (Paragraph 8)] 
9 Housing and Technical Resources’ Workforce Plan 2022 to 2025
A report dated 12 September 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on the Housing and Technical Resources’ Workforce Plan for the
period 2022 to 2025 and the associated key strategic actions for the Council. 
The Executive Committee had agreed the Council Workforce Plan 2017 to 2022, with Resources
being required to provide updates on their Workforce Plan to their respective Committees.  The
review of the Workforce Plans had been delayed due to the COVID-19 pandemic and
Resources had produced plans covering the period 2022 to 2025. 
The Housing and Technical Resources’ Workforce Plan 2022 to 2025, together with the Action
Plan, was attached as Appendix 1 to the report.  The Plan provided an overview of the services
delivered by the Resource, the service demands and a workforce profile.  This, along with the
strategic plans and drivers, was used to identify the objectives and actions required. 
The key themes for workforce planning that had been identified were:- 
 demographic of the workforce and the impact on succession planning
 ability to recruit and retain employees 
 development of current workforce to ensure skills were available to deliver in key strategic
areas for future developments and changes in respect of climate change and sustainability
and new IT technology
8

Page 9

 Refugee Resettlement Programme expansion and widening asylum dispersal
 maintaining employee wellbeing and resilience 
The key activities identified were:- 
 improved recruitment practices to attract and retain employees
 graduate and other apprenticeship approach to recruitment
 further expand links with schools and colleges to encourage consideration of a role with
the Council
 expand on methods, training and development to grow our own talent and future proof the
workforce
 robust succession planning across several key areas
 review working practices, making improved use of workforce/assets and considering future
needs to deliver key services in a changing environment
 optimise efficiency of existing workforce, including staff absence cover, application of
employee wellbeing supports/wellbeing, application of Maximising Attendance processes
and maintaining a solution focused approach to complex issues 
This aligned with the general common themes from all Resource Action Plans which were:- 
 increased demand and a reduced workforce pool which was a national issue
 demographic challenges, increased turnover, employees retiring earlier than expected and
succession planning
 employee wellbeing 
In response to a member’s question in relation to why there was no equality and diversity
monitoring included in this report, the HR Business Manager advised that the relevant
information in this report was the age demographic of the workforce and undertook to direct the
member to the information that he was looking for. 
The Committee decided: 
(1) that the content of the report be noted; and 
(2) that the Housing and Technical Resources’ Workforce Plan 2022 to 2025, attached as
Appendix 1 to the report, be approved. 
[Reference:  Minutes of 4 October 2017 (Paragraph 9)] 
10 Scottish Housing Regulator – Annual Assurance Statement 2021/2022
A report dated 22 August 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on the Annual Assurance Statement for South Lanarkshire Council. 
The Scottish Housing Regulator (SHR) had been established in 2011 as an independent body
directly accountable to the Scottish Government to regulate registered social landlords (RSLs)
and local authority housing and homelessness services.  The SHR did this by assessing and
reporting on social landlords’ delivery of services, RSLs financial well-being and standards of
governance and, where necessary, the SHR would intervene to secure improvements. 
The SHR had published a revised Regulatory Framework in 2019.  Local authority landlords
were required to submit an Annual Assurance Statement confirming compliance with the
regulatory requirements.
9

Page 10

South Lanarkshire’s Annual Assurance Statement for 2021/2022 was attached at Appendix 1 to
the report.  The key requirement of the Annual Assurance Statement was for the Committee to
confirm that it was confident that appropriate systems, evidence, relationships and channels of
communication were in place to ensure the effective planning, delivery and monitoring of
relevant services against statutory and regulatory requirements. 
Within South Lanarkshire, the assurance required was provided through a wide range of
arrangements which were in place at a Council and Resource wide level.  A summary of the key
requirements for assurance and how those were addressed was attached as Appendix 2 to the
report. 
The Regulator recognised that councils and RSLs continued to work to recover from the impact
of the pandemic and fully restore services and programmes of work, and that the pandemic
might continue to impact on compliance with regulatory requirements. 
The Council was required to identify any non-compliance with regulatory requirements that was
directly due to the pandemic and distinguish this from non-compliance for other reasons. 
The SHR had indicated that, provided that tenant and resident safety was not compromised, it
would not engage with a landlord where there was not full compliance with regulatory
requirements, specifically where the non-compliance was exclusively or largely a consequence
of the pandemic, and the landlord had effective plans to return to full compliance.  In relation to
this year’s statement, there were 2 points, highlighted below, where the Council was partially
compliant due to the ongoing effects from the pandemic:- 
♦ fire safety for Gypsy/Traveller sites
♦ Scottish Housing Quality Standards (SHQS) – Fire Tolerable Standards and Fixed
Electrical Testing 
In relation to the Council’s 2 Gypsy/Traveller sites, a programme of improvement work had been
progressed and compliance in terms of the revised fire safety standards had now been fully met
at one of the sites with partial compliance at the other.  Progress at the Council’s larger site at
Shawlands Crescent in Larkhall was now well advanced and would be fully compliant by the end
of November 2022.  Fire safety guidance continued to be a key focus of activity for the Council. 
In relation to SHQS and the reporting requirements of Fire Tolerable Standards and Fixed
Electrical Testing, a programme of work had progressed well, however, a number of actions
remained outstanding due to issues in relation to the availability of the required equipment and
also the ability to gain access to properties to carry out the installations/testing.  A further
programme of work was now in place to address those issues and was being closely monitored
within the Resource. 
Sector guidance on equalities data collection, ‘Collecting equality information: National
Guidance for Scottish social landlords’, had been published in August 2022 and updated in June
2022.  In this year’s Annual Assurance Statement, social landlords were asked to provide
assurance that they had or were in the process of implementing an effective approach to the
collection of equalities information and were considering how a human rights approach to their
work could be adopted.  This was reflected in the proposed Annual Assurance Statement. 
If approved, the Annual Assurance Statement would be submitted to the SHR to confirm the
required assurance. 
The Committee decided: that the Council’s Annual Assurance Statement 2021/2022,
attached as Appendix 1 to the report, be approved and
submitted to the Scottish Housing Regulator. 
[Reference:  Minutes of 29 September 2021 (Paragraph 9)]
10

Page 11

11 South Lanarkshire Council's Strategic Housing Investment Plan 2023 to 2028
A report dated 20 September 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on:- 
 progress in delivering affordable housing through the Strategic Local Programme
Agreement (SLPA) during 2021/2022
♦ the Strategic Housing Investment Plan (SHIP) for the 5-year period from 2023 to 2028 
The SHIP identified strategic housing projects to help deliver affordable homes and inform the
allocation of the affordable housing grant through the SLPA.  The SHIP and SLPA were
reviewed and updated annually to reflect changes to the 5 year rolling SHIP to include progress
made to deliver affordable housing in 2021/2022 and planned progress in the current year
2022/2023. 
The previous Local Housing Strategy (LHS), covering the period 2017 to 2022, was due to end
and a new strategy, covering the period 2022 to 2027, was currently at the consultation stage. 
The finalised strategy would be presented to the Executive Committee on 30 November 2022 for
approval. 
During 2021/2022, 551 affordable homes for rent had been delivered.  A summary of
completions by the Council and Registered Social Landlord (RSL) partners during 2021/2022
was provided in Appendix 1 to the report. 
The impact of the COVID-19 restrictions had interrupted all sectors of society, affecting the
construction and housing sectors’ ability to reach the national target for 50,000 affordable homes
by March 2021.  The target for completion of those homes had been extended to 2021/2022, as
detailed in the national housing strategy ‘Housing to 2040’. 
Despite the challenges presented by the pandemic, the Council and its RSL partners had
continued to make positive progress on increasing the supply of affordable housing across
South Lanarkshire.  This included the Council being on track to achieving its own target, set in
2017, of delivering 1,000 additional Council homes, within 2022/2023. 
The Scottish Government’s Affordable Housing Investment Benchmark Working Group worked
with the housing sector and CoSLA to undertake a review of the affordable housing benchmark
system and published revised information on this in October 2021. 
The revised baseline benchmark had been set for local authorities at £71,500 (3-person
equivalent), with the option to apply additional quality measure benchmarks where there was an
increase to the specification of properties to include items such as space for work or study, fire
suppression systems, zero emission heating systems amongst others, which could increase the
figure to £84,800.  Local authorities across Scotland were now working to the revised
benchmark levels. 
The Council would continue to deliver on its Home+ programme to increase the supply of
Council homes through the building of new homes and purchasing existing homes.  The
previous target of delivering 1,000 units would be achieved in 2022/2023, with a breakdown of
projects detailed in Appendix 2 to the report. 
Reports would be presented to this Committee requesting approval for the delivery of sites for
new homes and market purchases that would contribute to the delivery of the SHIP and assist in
achieving national supply targets, as detailed in the report.
11

Page 12

Of the 1,008 additional homes built or under construction to date, 383 homes (38%) had been
designed for particular needs, including 168 (17%) barrier free lift access amenity flats and 70
(7%) bungalows, all designed to meet the needs of older people and wheelchair users.  This
exceeded the 8% wheelchair housing target set within the LHS for the proportion of new build
social homes built to wheelchair accessible standards. 
The Council’s Open Market Purchase Scheme (OMPS) was closely aligned to the LHS priorities
and targeted the purchase of property to increase the Council’s supply of priority house types
and sizes depleted through Right to Buy.  The key aims were to meet specific and urgent
housing needs and wider housing quality improvement and regeneration priorities.  In
2021/2022, 53 homes had been purchased through the scheme and a further 60 had been
budgeted for acquisition during 2022/2023. 
A copy of the proposed SHIP and associated table of priority sites was attached as Appendix 3
to the report and included projects with total capacity for delivering up to 2,562 affordable homes
in South Lanarkshire over its lifespan.  It had been updated in line with national guidance for the
preparation of SHIPs. 
Any financial impact in relation to the costs of delivering additional Council housing would be
reported to this Committee for approval and would also be submitted for approval as part of the
Annual Housing Revenue and Capital Account Budget. 
The Council would continue to review its Affordable Housing Supply Programme to consider,
wherever possible, opportunities to extend the current programme to meet identified local
housing need and demand. 
If approved, the SHIP 2023 to 2028 would be submitted to the Scottish Government by 28
October 2022 to inform the allocation of the affordable housing grant funding through the SLPA.
Thereafter, it would be collated into a national programme for Ministerial approval, following
which, the SLPAs would be prepared for sign-off by each local authority. 
The Interim Executive Director (Housing and Technical Resources) advised members that some
of the figures detailed in the report were incorrect and advised of the updated figures.  The Chair
requested that the correct figures be minuted and that the updated report be published to the
Council’s website. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the progress made in increasing the supply of affordable housing through the SHIP
2022 to 2027 and SLPA be noted; and 
(2) that the content of the SHIP 2023 to 2028, as set out in Appendix 3 to the report, be
approved. 
[Reference:  Minutes of 29 September 2021 (Paragraph 14)] 
In terms of Standing Order No 14, the Chair adjourned the meeting at 10.59am and reconvened at
11.01am
12

Page 13

12 Housing Services’ Customer Involvement Strategy 2018 to 2022 Annual Review
2021/2022
A report dated 9 September 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on:- 
♦ the fourth annual review of Housing Services’ Customer Involvement Strategy 2018 to
2022
♦ proposals to develop a new Housing Services’ Customer Involvement Strategy during
2022/2023 
The Housing Services’ Customer Involvement Strategy 2018 to 2022 had been approved by this
Committee on 23 May 2018. 
The Annual Review of the Strategy 2021/2022 and associated Action Plan was attached as
Appendix 1 to the report and summarised progress made between 1 April 2021 and 31 March
2022 in engaging with and involving customers in developing and shaping Housing Services. 
The report outlined key achievements in 2021/2022 and the priority areas to be continued in
2022/2023. 
As detailed throughout the annual review, a range of actions had not been able to be
progressed as intended due to the impact of the COVID-19 pandemic and associated
restrictions.  As such, Tenant Participation Co-ordination Group (TPCG) members had proposed
that the Strategy be continued in its current form to enable commencement or completion of
those actions throughout 2022/2023, with a new strategy developed and submitted to this
Committee for approval in 2023/2024. 
As part of the review, customer representatives within the TCPG highlighted the priorities they
wished to see progressed by Housing Services in 2022/2023. 
Officers would continue to work with customer representatives and other services and partners
to progress those priorities through the remaining term of the Strategy.  Consideration would
also be given as to how the current approach to and methods of engagement could be
developed as part of the new strategy, revised and improved as necessary to meet the
continually evolving requirements of housing and homelessness customers. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Housing Services’ Customer Involvement Strategy 2018 to 2022 Annual Review
2021/2022, as detailed Appendix 1, be noted; and 
(2) that the proposed timeline for the development of the new Housing Services’ Customer
Involvement Strategy be approved. 
[Reference:  Minutes of 23 May 2018 (Paragraph 9) and 21 September 2021 (Paragraph 17)] 
13 1 Kilmory Road, Carluke – Asset Transfer to Carluke Men’s Shed
A report dated 8 September 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on a request for asset transfer, by lease, of the former Wilton
Cemetery House to Carluke Men’s Shed. 
The Council owned the former Wilton Cemetery House, 1 Kilmory Road, Carluke which had
been vacant since 2016, having previously been used as an office base by a local charity.
13

Page 14

Carluke Men’s Shed had submitted a request for the Community Asset Transfer of 1 Kilmory
Road, which included the house and 2 small outbuildings, and the validation date for this was
13 July 2022.  In addition to placing the application and supporting documentation on the
Council’s Planning Portal, notices had been placed on the property advising that the Council
was considering an asset transfer.  The closing date for responses had been 11 August 2022 at
which time 10 representations had been received, 9 in support and 1 neutral. 
The request had been placed before the Community Asset Transfer Assessment Panel on
12 September 2022 and details of the matters taken into consideration were provided in the
report. 
The Community Asset Transfer Working Group assessed the potential community benefits and
recommended that a discount of 71% be applied to the market value to reflect the benefits to the
community, which suggested a rent of £1,100 per annum. 
Carluke Men’s Shed had offered a rental of £500 per annum and also to undertake the repair
works estimated at £25,000.  This was considered to represent Best Value to the Council.  The
risks associated with the asset transfer were considered low. 
It was proposed to lease 1 Kilmory Road, Carluke, as shown on the attached plan, to Carluke
Men’s Shed, on the principal terms and conditions as detailed in the report. 
The Committee decided: 
(1) that the former Wilton Cemetery House, 1 Kilmory Road, Carluke be leased to Carluke
Men’s Shed, subject to the terms and conditions outlined in Section 5 of the report; and 
(2) that the Interim Executive Director (Housing and Technical Resources), in conjunction with
the Head of Administration and Legal Services, be authorised to conclude all matters in
respect of the lease and enter into the necessary legal agreements on terms which were in
the best interests of the Council. 
14 Annual Report on the Charter (ARC) 2021/2022
A report dated 24 August 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted providing an update on:- 
 the Scottish Social Housing Charter and the requirement to produce an Annual Report on
the Charter (ARC) covering performance during 2021/2022
 arrangements to monitor and report on Charter progress throughout 2022/2023 
The Charter contained 32 measures of performance which reflected a mixture of qualitative,
survey-based information as well as a range of efficiency and effectiveness measures.  To
comply with the requirements set out by the Scottish Housing Regulator (SHR), the Resource
submitted its 2021/2022 performance information to the Regulator on 26 May 2022. 
The Charter report was consistent with those of previous years and a summary, attached as
Appendix 1 to the report, provided further details on each indicator together with a comparison
against the Scottish average for all social landlords and that of the other Scottish local authority
landlords.  Of the 12 reported indicators, 3 had improved, 3 remained the same and 6 had
declined. 
The report provided further information on each performance indicator.  The Resource Plan
2022/2023 would continue to be monitored and reported as part of the 6-monthly update to the
Committee. 
14

Page 15

The Committee decided: 
(1) that the Council’s reported performance and contextual information for the Scottish Social
Housing Charter and comparisons with other landlords, as detailed at Appendix 1 of the
report, be noted; and 
(2) that the future use of the Charter for ongoing scrutiny by the Scottish Housing Regulator
(SHR), tenants and other service users be noted. 
[Reference:  Minutes of 29 September 2021 (Paragraph 15)] 
15 Housing and Technical Resource Plan 2022/2023
A report dated 9 September 2022 by the Interim Executive Director (Housing and Technical
Resources) was submitted on the Housing and Technical Resource Plan 2022/2023. 
Details were provided on the Resource Plan for 2022/2023, attached as Appendix 1 to the
report, which outlined the:- 
 key areas of focus for the year ahead
 objectives and outcomes
 measures and actions
 resourcing of the Plan 
The Resource had established a number of objectives to support the delivery of the Connect
priorities in 2022/2023, which were detailed in Appendix 2 to the report.  In line with the
Council’s performance management arrangements, a mid-year progress report on actions
identified in the 2022/2023 Resource Plan and an end of year progress respectively, would be
submitted to a future meeting of the Committee. 
The Committee decided: that the Housing and Technical Resource Plan for
2022/2023 be noted and uploaded to the Council’s website. 
[Reference:  Minutes of the Executive Committee of 24 August 2022 (Paragraph 8)] 
16 Urgent Business
There were no items of urgent business. 
15

Page 16

16

Page 17

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 4 November 2022 for Housing and Technical
Resources (excl HRA)
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position as at 4 November 2022 on Housing and Technical
Resources (excl HRA) Revenue Budget, as detailed in Appendix A of the
report, be noted; and
(2) that the proposed budget virements, be approved.
[1recs]
3. Background
3.1. This is the third revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) in Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 4 November 2022, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed. In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
we have mitigated this through providing additional funds in future years budget
strategy and in this year, through some reserve funds available. 
3
17

Page 18

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental Implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 5 October 2022 
List of Background Papers
 Financial ledger and budget monitoring results to 4 November 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Hazel Goodwin, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Hazel.Goodwin@southlanarkshire.gov.uk
18

Page 19

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 4 November 2022 (No.8) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
04/11/22
Actual
04/11/22
Variance
04/11/22 
%
Variance
04/11/22 Notes            
Budget Category            
Employee Costs 44,426  44,426  0  25,109  24,876  233  under 0.9% 
Property Costs 19,898  19,898  0  14,009  14,329  (320) over (2.3%) 
Supplies & Services 14,167  14,167  0  7,927  6,552  1,375  under 17.3% 
Transport & Plant 4,677  4,677  0  2,455  2,417  38  under 1.5% 
Administration Costs 3,746  3,746  0  2,276  2,314  (38) over (1.7%) 
Payments to Other Bodies 8,711  8,711  0  4,811  4,808  3  under 0.1% 
Payments to Contractors 18,756  18,756  0  10,784  10,526  258  under 2.4% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  154  0  98  95  3  under 3.1% 
Total Controllable Exp. 114,535  114,535  0  67,469  65,917  1,552  under 2.3% 
Total Controllable Inc. (96,727) (96,727) 0  (53,734) (52,182) (1,552) under
recovered (2.9%) 
Net Controllable Exp. 17,808  17,808  0  13,735  13,735  0  - 0.0% 
Transfer to Reserves as
at (04/11/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (04/11/22) 17,808  17,808  0  13,735  13,735  0  - 0.0% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate.
19

Page 20

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 4 November 2022 (No.8) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
04/11/22
Actual
04/11/22
Variance
04/11/22 
%
Variance
04/11/22 Notes            
Budget Category            
Employee Costs 2,882  2,882  0  1,571  1,547  24  under 1.5% 
Property Costs 5,765  5,765  0  3,639  3,687  (48) over (1.3%) a
Supplies & Services 130  130  0  73  65  8  under 11.0% 
Transport & Plant 129  129  0  73  61  12  under 16.4% 
Administration Costs 147  147  0  97  101  (4) over (4.1%) 
Payments to Other Bodies 4,838  4,838  0  2,810  2,806  4  under 0.1% b
Payments to Contractors 2,750  2,750  0  1,126  1,126  0  - 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  11  0  9  11  (2) over (22.2%) 
Total Controllable Exp. 16,652  16,652  0  9,398  9,404  (6) over (0.1%) 
Total Controllable Inc. (7,568) (7,568) 0  (3,890) (3,939) 49  over
recovered 1.3% 
Net Controllable Exp. 9,084  9,084  0  5,508  5,465  43  under (0.8%) 
Transfer to Reserves as
at (04/11/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (04/11/22) 9,084  9,084  0  5,508  5,465  43  under (0.8%) 
Variance Explanations 
No significant variances to report. 
Budget Virements 
a. Corporate Procurement Savings Property Costs net (£0.014m): (£0.014m) Property Costs.
b. Transfer of Homeless Funding (LACER and RRTP) from Reserves net £0.617m: £0.617m Payments to Other Bodies. 
20

Page 21

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 4 November 2022 (No.8)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
04/11/22
Actual
04/11/22
Variance
04/11/22 
%
Variance
04/11/22 Notes            
Budget Category            
Employee Costs 41,544  41,544  0  23,538  23,329  209  under 0.9% 1
Property Costs 14,133  14,133  0  10,370  10,642  (272) over (2.6%) 2
Supplies & Services 14,037  14,037  0  7,854  6,487  1,367  under 17.4% 3, a
Transport & Plant 4,548  4,548  0  2,382  2,356  26  under 1.1% 
Administration Costs 3,599  3,599  0  2,179  2,213  (34) over (1.6%) 
Payments to Other Bodies 3,873  3,873  0  2,001  2,002  (1) over (0.0%) b
Payments to Contractors 16,006  16,006  0  9,658  9,400  258  under 2.7% 4
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143  143  0  89  84  5  under 5.6% 
Total Controllable Exp. 97,883  97,883  0  58,071  56,513  1,558  under 2.7% 
Total Controllable Inc. (89,159) (89,159) 0  (49,844) (48,243) (1,601) under
recovered (3.2%) 5
Net Controllable Exp. 8,724  8,724  0  8,227  8,270  (43) over 0.5% 
Transfer to Reserves as
at (04/11/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (04/11/22) 8,724  8,724  0  8,227  8,270  (43) over 0.5% 
Variance Explanations 
1. The variance relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are determined.
2. The overspend relates primarily to service charges within the estates service.
3. The level of expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue
works.
4. The use of private contractors varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
5. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
a. Corporate Procurement Savings Supplies and Services net (£0.024m): (£0.024m) Supplies & Services.
b. Transfer of Community Assets to Finance and Corporate Resources net (£0.113m): (£0.113m) Payments to Other Bodies. 
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources - Housing Revenue Account
(HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 4 November 2022 for Housing and Technical
Resources HRA
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ HRA
revenue budget, as detailed in Appendix A of the report, be noted.
1recs]
3. Background
3.1. This is the third revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources HRA in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 4 November 2022, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed. In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
these pressures are assessed and managed within the budget planning exercise for
current and future years. 
4
23

Page 24

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental Implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 30 November 2022 
List of Background Papers
 Financial ledger and budget monitoring results to 4 November 2022. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Hazel Goodwin, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Hazel.Goodwin@southlanarkshire.gov.uk
24

Page 25

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 4 November 2022 (No.8) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
04/11/22
Actual
04/11/22
Variance
04/11/22 
%
Variance
04/11/22 Notes            
Budget Category            
Employee Costs 13,914  13,914  0  7,880  7,809  71  under 0.9% 1
Property Costs 46,906  46,906  0  30,586  30,589  (3) over (0.0%) 
Supplies & Services 609  609  0  268  246  22  under 8.2% 
Transport & Plant 195  195  0  100  66  34  under 34.0% 
Administration Costs 5,644  5,644  0  3,368  3,375  (7) over (0.2%) 
Payments to Other Bodies 3,030  3,030  0  1,701  1,703  (2) over (0.1%) 
Payments to Contractors 100  100  0  73  104  (31) over (42.5%) 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 26,050  26,050  0  22,584  22,584  0  - 0.0% 
Total Controllable Exp. 96,448  96,448  0  66,560  66,476  84  under 0.1% 
Total Controllable Inc. (112,000) (112,000) 0  (60,107) (60,107) 0  - 0.0% 
Transfer to/(from) Balance
Sheet (2,773) (2,773) 0  (1,848) (1,764) (84) under
recovered (4.5%) 2
Net Controllable Exp. (18,325) (18,325) 0  4,605  4,605  0  - 0.0% 
Loan Charges 18,325  18,325  0  0  0  0  -   
Net Controllable Exp. 0  0  0  4,605  4,605  0  - 0.0% 
Variance Explanations 
1. The variance is due to higher than anticipated staff turnover.
2. The net combined underspend to date allows for a lower than budgeted transfer from reserves. 
Virements 
None. 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (excl Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl HRA) for the period 1 April 2022 to 4 November 2022
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources (excl HRA) capital programme of
£8.486 million and expenditure to date of £0.924 million, be noted.
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023.  Further reports will follow
throughout the year. 
3.2. As noted in the last report to this Committee (5 October 2022), the budget for
Housing and Technical Resources for financial year 2022/2023 is £8.486 million.
There has been no change to this budget since the last report to this Committee. 
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As detailed in Section 3.3, the revised capital programme for Housing and Technical
Resources for 2022/2023 is £8.486 million.   
5.2. Period 8 Position 
Anticipated spend to date was £1.045 million and spend to 4 November 2022
amounts to £0.924 million, an underspend of £0.121 million.  This mainly reflects the
timing of spend on the multi-year and multi-project Prioritised Urgent Investment and
Principal Offices programmes.   
5
27

Page 28

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The Council continues to experience material shortages, longer lead
times and extraordinary inflationary price increases and it is anticipated that this will
continue to impact the supply chain for the foreseeable future.  The impact of this will
continue to be monitored through the 4-weekly investment management meetings. 
Further updates will be reported in the coming months with any significant increases
in contract values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 5 October 2022 
List of Background Papers
 Financial ledger to 4 November 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
28

Page 29

Appendix A 
South Lanarkshire Council
Capital Expenditure 2022-2023
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2022 – 4 November 2022 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000
Asset Management
Programmes 7,758 188 0 7,946  992 871
Other Housing 367 173 0 540  53 53
TOTAL 8,125 361 0 8,486  1,045 924 
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources HRA for the period 1 April 2022 to 4 November 2022
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources HRA capital programme of
£66.361 million and expenditure of £30.783 million, be noted.
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023. 
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 24 August 2022. 
3.3. The report details the financial position for Housing and Technical Resources HRA in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2022/2023 totals £66.361 million and is detailed
along with the funding sources at Appendix A to this report.  Actual expenditure to 4
November 2022 is £30.783 million. 
5.2. The Resource is expecting to spend to this level and work will continue in the coming
months to monitor achievable spend.  
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
6
31

Page 32

7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through 4-weekly
Investment Management meetings. 
7.2 The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact on the supply chain for the foreseeable future.  The impact will continue to be
monitored through the 4-weekly investment management meetings.  Further updates
will be reported in the coming months with any significant increases in contract
values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 November 2022 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, effective, efficient and transparent 
Previous References
▪ Executive Committee, 24 August 2022 
List of Background Papers
▪ Financial ledger to 4 November 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  hazel.goodwin@southlanarkshire.gov.uk
32

Page 33

South Lanarkshire Council       Appendix A
Housing Capital Programme 2022/23
As at 4 November 2022 
£m £m
Anticipated Capital Expenditure 2022/23   66.361
Estimated Financing Position 2022/23   
Capital Receipts  7.311  
Capital Financed From Current Revenue 26.050  
Prudential Borrowing 26.462  
Specific Grant – Scottish Government New Council Houses 4.048  
Specific Grant – Scottish Government Buy Backs 2.370  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
66.361 
Actual Expenditure to 4 November 2022  30.783 
Actual Financing Position to 4 November 2022   
Capital Receipts  4.613  
Capital Financed From Current Revenue 22.534  
Prudential Borrowing 0.000  
Specific Grant – Scottish Government New Council Houses 3.581  
Specific Grant – Scottish Government Buy Backs 0.000  
Specific Grant – Scottish Government Mortgage to Rent 0.055  
Other Income 0.000        
30.783 
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – August and September 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for August and September 2022 relating to
Housing and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for August and September 2022
relating to Housing and Technical Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 10 September 2022 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for August and September
2022. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of September 2022 for
Housing and Technical Resources. 
The Resource absence figure for September 2022 was 5.2%, this figure has
decreased by 0.5% when compared to last month and is 0.2% lower than the
Council-wide figure.  Compared to September 2021, the Resource absence figure
has decreased by 1.6%. 
Based on the absence figures at September 2022 and annual trends, the projected
annual average absence for the Resource for 2022/2023 is 6.8% compared to a
Council-wide average figure of 6.0%.
7
35

Page 36

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services works in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
The attendance information contained in this report includes absences as a result of
COVID-19 and employees are being supported to maintain attendance levels where
they can.  At the time of this report, the Council overall absence level was 6.12% with
0.54% of this relating to COVID-19 for sickness and special leave. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall 87 referrals were made this period.  This represents a
decrease of 39 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 5 accidents/incidents recorded within the Resource this period, an
increase of 3 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, no disciplinary hearings were held within the Resource, this
represents a decrease of 3 when compared to the same period last year.  During this
period no appeals were heard by the Appeals Panel.  No grievances were raised
within the Resource, this figure has decreased by 1 when compared to the same
period last year.  No Dignity at Work complaints were raised within the Resource,
this figure has decreased by 1 when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 11 leavers in the Resource this period eligible for an exit
interview.  This figure has increased by 3 when compared with the same period last
year.  Five exit interviews were conducted in this period, this remains unchanged
when compared with the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period August and September 2022, 24 (20.29
FTE) employees in total left employment, managers indicated that all employees will
be replaced. 
5. Staffing Watch 
5.1. There has been a decrease of 8 in the number of employees in post from 11 June
2022 to 10 September 2022. 
36

Page 37

6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability and environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no other implications or risk in terms of the information contained within
this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 November 2022 
Link(s) to Council Values/Priorities/Outcomes
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others 
Previous References
 Housing and Technical Resources, 5 October 2022 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
37

Page 38

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 4.1 3.2 5.5 April 3.5 3.6 10.6 April 3.8 3.3 7.6 April 4.4 4.3 5.6
May 2.8 2.9 4.5 May 2.0 4.2 8.1 May 2.5 3.4 6.0 May 3.1 4.9 5.4
June 3.2 3.5 4.9 June 2.0 6.2 8.5 June 2.7 4.6 6.4 June 2.7 4.7 5.3
July 2.7 4.0 5.5 July 2.7 5.7 8.9 July 2.7 4.7 6.9 July 2.3 4.0 4.6
August 2.5 4.9 4.7 August 3.4 7.9 7.1 August 2.8 6.2 5.7 August 3.1 4.7 4.4
September 2.1 5.8 4.5 September 3.3 8.1 6.3 September 2.6 6.8 5.2 September 4.2 6.4 5.4
October 2.9 5.2 October 3.9 9.0 October 3.3 6.8 October 4.8 6.3
November 3.7 5.7 November 5.6 9.2 November 4.5 7.2 November 5.8 6.9
December 3.3 4.6 December 4.8 9.5 December 3.9 6.7 December 5.6 6.9
January 3.5 5.2 January 4.4 8.8 January 3.9 6.7 January 4.8 7.0
February 3.2 6.4 February 4.7 8.5 February 3.8 7.3 February 4.8 6.6
March 3.1 7.8 March 4.5 10.7 March 3.6 9.0 March 4.9 7.9
Annual Average 3.1 4.9 5.4 Annual Average 3.7 7.6 8.8 Annual Average 3.3 6.1 6.8 Annual Average 4.2 5.9 6.0
Average Apr-Sep 2.9 4.1 4.9 Average Apr-Sep 2.8 6.0 8.3 Average Apr-Sep 2.9 4.8 6.3 Average Apr-Sep 3.3 4.8 5.1
862 578 1440 16136
Council Wide
No of Employees at 30 Sept 2022No of Employees at 30 Sept 2022 No of Employees at 30 Sept 2022 No of Employees at 30 Sept 2022
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
APT&C Manual Workers
38

Page 39

HOUSING AND TECHNICAL RESOURCES
Aug-Sep Aug-Sep
2021 2022
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 33 19
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 126 87
Aug-Sep Aug-Sep
2021 2022
Specified Injuries* 0 0
Over 7 day absences 0 1
Over 3 day absences** 0 1
Minor 2 1
Near Miss 0 0
Violent Incident:  Physical**** 0 0
Violent Incident:  Verbal***** 0 2
Total Accidents/Incidents 2 5
Aug-Sep Aug-Sep
2021 2022
Total Number of Hearings 3 0
Time Taken to Convene Hearing Aug - Sep 2022
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 0 0
Aug-Sep Aug-Sep
2021 2022
Number of Grievances 1 0
Number Resolved at Stage 2 1 0
Aug-Sep Aug-Sep
2021 2022
Number of Incidents 1 0
Still in Process 1 0
Aug-Sep Aug-Sep
2021 2022
Career Advancement 3 2
Poor Relationship with Manager/Colleagues 1 1
Personal Reasons 0 2
Other 1 0
Number of Exit Interviews conducted 5 5
Total Number of Leavers Eligible for Exit Interview 8 11
Percentage of interviews conducted 63% 45%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
25
APPENDIX 2
41 36
5 7
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
47
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
39

Page 40

Appendix 2a     
Aug - Sep 2022
Cumulative
total
(Apr 22 - Mar
23)  
FTE* H/C** FTE H/C
Number of Leavers 20.29 24 55.83 69
Replace Employee 20.29 24 54.83 68
Filling on a Temp Basis 0.00 0 0.00 0
Plan to transfer budget to another post 0.00 0 0.00 0
End of fixed term post 0.00 0 0.00 0
Leave vacant pending savings or service review 0.00 0 1.00 1
Plan to remove for savings 0.00 0 0.00 0     
* Full time equivalent     
** Head count/number of employees     
40

Page 41

As at 10 September 2022
Total Number of Employees
F/T P/T F/T P/T
823 26 320 122
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 216.87 615.18 358.87 28.60 11.00 2.00 0.00 0.00 1233.52
As at 11 June 2022
Total Number of Employees
F/T P/T F/T P/T
829 24 320 126
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 214.12 622.86 358.48 33.60 9.00 2.00 0.00 0.00 1241.06
Salary Bands
Appendix 3
JOINT STAFFING WATCH RETURN
HOUSING & TECHNICAL RESOURCES
1291
1299
*Full - Time Equivalent No of Employees
MALE FEMALE
MALE FEMALE TOTAL
TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
41

Page 42

42

Page 43

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Acquisition of Houses at Former Phillips Factory Site
Wellhall Road, Hamilton - Section 75 Planning
Reference PL/21/1697 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval to acquire 40 homes at the former Philips factory site Wellhall
Road, Hamilton from Lovell Homes, for inclusion in the Council’s housing stock in
fulfilment of the planning obligations associated with the residential development
of the site 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Executive Director (Housing and Technical Resources) be authorised
to acquire 40 completed affordable homes from Lovell Homes for a total price,
not in excess of £7.0 million (which includes the cost of land), to fulfil the
planning obligations associated with the residential development of the site;
and 
(2) that authority is granted to the Executive Director (Housing and Technical
Resources), in conjunction with the Head of Administration and Legal
Services, to conclude transactions, in the appropriate manner and in the best
interest of the Council. 
[1recs]
3. Background
3.1.  The site at the former Philips factory, Wellhall Road in Hamilton is identified within
the Council’s Strategic Housing Investment Plan as a priority site in delivering the
Council’s target of 1,300 additional homes by 2027. 
3.2. The application for the development at Wellhall Road, Hamilton was approved by the
Planning Committee on 15 February 2022.  The approval was granted for the
erection of 163 dwellings to Lovell Homes and includes an obligation for an on-site
provision of up to 40 affordable homes. 
3.3. The Council entered into discussions with Lovell Homes to provide its planning
obligation for new affordable homes via a turnkey arrangement with the Council only
paying the full amount due on completion of each house.  The proposal provided by
Lovell Homes has been assessed by the Council’s Technical and Commercial Team
as presenting value for money.  
8
43

Page 44

4. Proposal
4.1. It is, therefore, proposed to acquire, 40 completed properties subject to the following
principal conditions:- 
♦ the Council will pay a deposit of the land value of £1,238,183.81 plus VAT
♦ an additional payment of £25,000 will be made for each foundation completed
on a quarterly basis
♦ 50% of balance per total number of roofs tiled - payable quarterly for all roofs
tiled within the period 
♦ the balance of the purchase price will be paid upon completion and transfer of
title
♦ the properties will be acquired in batches of 6 units or more, at a time
♦ the Council will obtain a standard security over the site until such times as all
properties have been completed
♦ the Council will receive a third party warranty covering defects and structure
♦ each party will be responsible for their own legal fees 
5. Employee Implications
5.1. There are no employee implications associated with this report. 
6. Financial Implications
6.1. In line with the Home+ Programme, including the new target established at Executive
Committee on 30 November 2022, acquisition of the plots will be funded through a
combination of Scottish Government grant funding, Housing Revenue Account
capital investment and Council borrowing. 
6.2. Should expected levels of Scottish Government grant be received and average costs
for borrowing and capital contributions continue, it is expected the new build aspect
of the Home+ programme and in particular the acquisitions of these plots, would
have a neutral impact to the Housing Revenue Account Business Plan over a 40-
year period.  This means that over the 40-year period, the net cost of the additional
borrowing and all other costs can be met from the additional rental income received. 
6.3. Whilst there is a neutral impact on the Housing Revenue Account Business Plan
over a 40-year period, there are initial construction and purchase costs at the start of
the programme which impact on the cash flow in the early years of the programme.
The estimated costs have been included in the Business Plan in respect of the rent
uplift projections for 2023/2024.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising
from this proposal. 
8 Other Implications
8.1. If the proposal did not proceed there would be implications on the supply of social
housing units within the Council’s New Housing Supply Programme. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. All necessary consultations with Housing, Planning, Roads and Legal Services have
taken place and they are supportive of the proposal. 
9.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
44

Page 45

Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
45

Page 46

46

Page 47

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Acquisition of Houses at Brackenhill Farm, Hamilton -
Section 75 Planning Reference PL/21/2093 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval to acquire 50 homes at Brackenhill Farm, Hamilton from Taylor
Wimpey, for inclusion in the Council’s housing stock, in fulfilment of the
planning obligations associated with the residential development of the site
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Executive Director (Housing and Technical Resources) be authorised
to acquire 50 completed affordable homes from Taylor Wimpey, for a total
price not in excess of £8.545 million (which includes the cost of land), to fulfil
the planning obligations associated with the residential development of the
site; and 
(2) that authority is granted to the Executive Director (Housing and Technical
Resources), in conjunction with the Head of Administration and Legal
Services, to conclude transactions, in the appropriate manner and in the best
interest of the Council. 
[1recs]
3. Background
3.1.  The site at Brackenhill Farm in Hamilton is identified within the Council’s Strategic
Housing Investment Plan as a priority site in delivering the Council’s target of 1,300
additional homes by 2027.  This site forms 1 part of the Hamilton Community Growth
Area (CGA), which is located on the south west edge of Hamilton and is designated
for residential development to meet Glasgow and Clyde Valley Structure Plan
requirements for the release of 2,000 houses. 
3.2. The application for the development at Brackenhill Farm, Hamilton was approved by
the Planning Committee on 11 October 2022.  The approval was granted for the
erection of 53 dwellings to Taylor Wimpey, this has now been consented and
includes an obligation for an on-site provision of up to 50 affordable homes. 
3.3. The Council entered into discussions with Taylor Wimpey to provide its planning
obligation for new affordable homes via a turnkey arrangement with the Council only
paying the full amount due on completion of each property.  The proposal provided
by Taylor Wimpey has been assessed by the Council’s Technical and Commercial
Team as representing value for money.
9
47

Page 48

4. Proposal
4.1. It is, therefore, proposed to acquire, 50 completed properties subject to the following
principal conditions:- 
♦ the Council will pay a deposit of £20,000 per unit
♦ an additional payment of £25,000 will be made when foundations are complete
to be valued on a quarterly basis
♦ 50% of balance per total number of roofs tiled - payable quarterly for all roofs
tiled within the period 
♦ the balance of the purchase price will be paid upon completion and transfer of
title
♦ the properties will be acquired in batches of 6 units or more, at a time
♦ the Council will obtain a standard security over the site until such times as all
properties have been completed
♦ the Council will receive a third party warranty covering defects and structure
♦ each party will be responsible for their own legal fees 
5. Employee Implications
5.1. There are no employee implications associated with this report. 
6. Financial Implications
6.1. In line with the Home+ Programme, including the new target established at Executive
Committee on 30 November 2022, acquisition of the plots will be funded through a
combination of Scottish Government grant funding, Housing Revenue Account
capital investment and Council borrowing. 
6.2. Should expected levels of Scottish Government grant be received and average costs
for borrowing and capital contributions continue, it is expected the new build aspect
of the Home+ programme and in particular the acquisitions of these plots, would
have a neutral impact to the Housing Revenue Account Business Plan over a 40-
year period.  This means that over the 40-year period, the net cost of the additional
borrowing and all other costs can be met from the additional rental income received. 
6.3. Whilst there is a neutral impact on the Housing Revenue Account Business Plan
over a 40-year period, there are initial construction and purchase costs at the start of
the programme which impact on the cash flow in the early years of the programme. 
The estimated costs have been included in the Business Plan in respect of the rent
uplift projections for 2023/2024.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising
from this proposal. 
8 Other Implications
8.1. If the proposal did not proceed there would be implications on the supply of social
housing units within the Council’s New Housing Supply Programme. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. All necessary consultations with Housing, Planning, Roads and Legal Services have
taken place and they are supportive of the proposal. 
9.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
48

Page 49

Stephen Gibson
Executive Director ( Housing and Technical Resources) 
21 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
49

Page 50

50

Page 51

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Policy and Strategy Review Schedule 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval for the policy and strategy review schedule for Housing and
Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the policy and strategy review schedule, attached at Appendix 1, be
approved; and 
(2) that the outcome of policy and strategy reviews be reported to future
Committees, in line with the schedule
[1recs]
3. Background
3.1. To support ongoing and systematic service improvement processes, a formal policy
and strategy review schedule was established in October 2011.  This schedule is
reviewed on an annual basis and reported to the Housing and Technical Resources
Committee.  The last updated policy and strategy review schedule was presented to
Committee on 8 December 2021. 
3.2. The policy and strategy review schedule assists annual service planning by providing
a clear timeframe for the formal review of all key housing policies and strategies. 
The review schedule also informs the development of the annual work plan for
customer involvement.  This provides a basis for the Council to ensure that its
statutory obligations in relation to engagement, participation and consultation take
place with service users helping to inform and influence housing policy and service
delivery. 
3.3. This report seeks approval for an updated policy and strategy review schedule.  The
updated schedule reflects changes in the local and national policy context, including
legislative and regulatory changes. 
4. Outline of the Policy and Strategy Review Schedule
4.1. The policy and strategy review schedule, attached as Appendix 1, sets out:- 
♦ details of housing policies and strategies 
♦ the frequency of reviews
♦ when the reviews are next scheduled to take place 
10
51

Page 52

4.2. As part of the policy and strategy review process, associated procedures and
protocols, which support the delivery of services, are also considered and reviewed
as appropriate.  This ensures that scope for service improvements is also considered
as part of the review process. 
4.3. The scope of the policy/strategy areas covered by the schedule is consistent with the
key service areas identified by the Scottish Housing Regulator’s regulatory
framework.  In summary, these are:- 
♦ allocation of housing
♦ rent management
♦ tenancy and estate management services
♦ repairs, maintenance and improvement
♦ services provided at Council managed Gypsy/Traveller sites  
♦ tenant participation
♦ homelessness 
4.4. In addition to the areas noted at 4.3, the review also incorporates key housing and
other strategies which the Resource has lead responsibility for within the Council. 
5. Next Steps
5.1. The schedule will inform the Resource and Service Plans for 2023/2024 and will be
used to establish a joint programme for customer engagement and scrutiny, a key
objective within the Customer Involvement Strategy.   
5.2. The proposed frequency of review is considered appropriate to the individual policy
or strategy area.  In some circumstances, linked to legislative or regulatory changes,
there may be a requirement for a policy or strategy to be revised within a scheduled
period.  An updated schedule will be presented to the Housing and Technical
Resources Committee on an annual basis which will advise of progress and any
amendments to the schedule. 
5.3. The Housing and Technical Resources Committee will continue to be updated fully
and separately in relation to the development of the specific policies and strategies
contained within the schedule. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. There are no financial implications associated with this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. This report does not introduce a new policy, function or strategy which impacts on the
natural environment, climate change or sustainability. 
9. Other Implications
9.1. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement to the Scottish Housing Regulator. 
10. Equality Impact Assessment and Consultation Arrangements
10.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
52

Page 53

10.2. On an ongoing basis, discussions take place with customer representatives on the
future programme for customer engagement.  These discussions are reflected in the
proposed schedule.  The schedule provides a basis for discussion with customers
and other service users to facilitate planning for future service delivery. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
22 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Housing and Land - good quality, suitable and sustainable places to live
 Communities and Environment - caring, connected, sustainable communities 
Previous References
 Policy and Strategy Review Schedule, Housing and Technical Resources Committee, 8
December 2021 
List of Background Papers
 None 
Contact for Further Information
If you require further information, please contact: - 
Linda Pearson, Strategy Co-ordinator
Ext: 4092  (Tel: 01698 454092)
Email:  linda.pearson@southlanarkshire.gov.uk  
53

Page 54

Appendix 1: Housing and Technical Resources Policy and Strategy Review Schedule
(Revised October 2022) 
Strategy and Policy Review frequency Date of next review
1. Rapid Rehousing Transition
Plan (RRTP)
Annually 2023/2024 
2. Strategic Housing
Investment Plan (SHIP) 
Annually 2023/2024 
3. Customer Involvement
Strategy
4-yearly  2023/2024 
4. Home Improve/Scheme of
Assistance Grants
5-yearly 2023/2024 
5. Anti-social Behaviour
Strategy
5-yearly 2023/2024 
6. Gypsy/Travellers
Pitch Allocation Policy
5-yearly 2024/2025
7. Repairs Policy 5-yearly 2024/2025 
8. Housing Allocation
Policy
5-yearly 2024/2025
9. Rent Management Policy  5-yearly 2025/2026 
10. Tenancy and Estate
Management
Policy
5-yearly 2025/2026 
11. Anti-social Behaviour Policy  5-yearly 2026/2027 
12. Local Housing Strategy  5-yearly 2027/2028 
54

Page 55

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Enhancements to the South Lanarkshire Council Open
Market Purchase Scheme 
1. Purpose of Report
1.1. The purpose of this report is to:-
 seek approval from Committee to broaden the scope of the South Lanarkshire’s
Open Market Purchase Scheme, as detailed at sections 4.3 and 4.4 below 
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:-
(1) that the additional criteria for an enhanced Open Market Purchase Scheme, as
detailed within sections 4.3 and 4.4, be approved. 
3. Background 
3.1. The current South Lanarkshire Open Market Purchase Scheme (OMPS) was
approved by the Housing and Technical Resources Committee in July 2015 and
amended in February 2021.  The scheme aims to help increase the supply of Council
housing to meet housing need, whilst maximising use of Scottish Government
Affordable Housing Supply Programme funding. 
3.2. The OMPS allows officers from within Housing and Technical Resources to review
properties for sale on the housing market with a view to purchasing them to add to
the Council’s housing stock. 
3.3. The existing criteria for the OMPS, aligned with the key strategic outcomes set out
within the South Lanarkshire Local Housing Strategy 2022 to 2027, requires:- 
♦ that the property is of a particular type or size required to meet identified
housing need and demand within an area 
♦ that the property will support regeneration within an area or allow the Council to
tackle a particular issue in an area 
♦ that the property will make the Council the majority owner in a block and allow
for future investment or improvement work to be undertaken 
♦ that the property provides the most cost effective and appropriate solution to
meeting an urgent and specific housing need 
♦ that the property has a valid Home Report available to review 
3.4. In February 2021, the Housing and Technical Resources Committee approved the
extension of the criteria for the OMPS to include consideration of long-term empty
properties in the private sector not being marketed for sale.  This extension
stipulated that the property required to be empty for at least a 24-month period, as
detailed within Council Tax records. 
11
55

Page 56

3.5. This extension aimed to provide greater flexibility in acquiring properties under the
OMPS, improving opportunities for the Council to meet identified housing need as
well as having the ability to bring long-term empty homes back into use across South
Lanarkshire. 
3.6. Annual targets for the existing OMPS are set out in the Strategic Housing Investment
Plan and reported to the Housing and Technical Resources Committee each year. 
Since 2018 this target has been set at 60 properties. 
3.7. In 2018/2019 and 2019/2020 this target was exceeded with 61 properties purchased
in both years.  In 2020/2021 the target was not met with 53 properties purchased. 
This was mainly due to the challenges posed by the COVID-19 pandemic and the
impact that had on the property market at that time.  In 2021/2022, again 53
properties were purchased with the Council’s purchasing ability impacted by market
conditions.  
4. Proposed Enhancements to the South Lanarkshire OMPS 
4.1.  On 30 November 2022, the Executive Committee approved a new target to deliver
an additional 1,300 Council homes within South Lanarkshire by 2027.  To support
the Council in achieving this target and to align with updated strategic priorities within
the new South Lanarkshire Local Housing Strategy 2022 to 2027, it is proposed that
the current OMPS scheme be revised to take account of 1 amendment to the current
provisions and the addition of 2 new criteria. 
4.2. An outline of the context and rationale for the amendment and additions is detailed in 
Appendix 1.  It should be noted that the proposed amendment and additions to the
scheme will operate in conjunction with the existing criteria noted at section 3.3
above. 
4.3. It is proposed that the scope provided through the scheme to purchase long-term
empty properties (noted at section 3.4 above) is revised to:- 
♦ allow private sector properties which are not being actively marketed for sale
and which have been empty for a period of more than 12 months, as
determined by Council Tax records, to be considered by the Council for
purchase under the scheme 
4.4. Proposed criteria to expand the scope within which the Council can purchase
properties through the scheme are detailed below:- 
♦ that owner occupiers and private landlords of former Council properties can
contact the Council directly with the offer of property for sale
♦ the Council can engage with private landlords who currently lease properties to
the Council but no longer wish to remain in the sector, to purchase their
properties directly from them 
5. Next Steps
5.1. Following Committee approval, it is proposed that the amendment to the current 
OMPS and the additional new criteria, as set out in section 4, be introduced with
immediate effect. 
5.2. Details relating to the enhanced scheme will be appropriately publicised and
promoted and Housing and Technical Resources will develop new or revised internal
procedures and guidance to facilitate these enhancements.
56

Page 57

5.3. Performance in relation to the number of purchases completed as part of the OMPS
will continue to be reported to the Housing and Technical Resources Committee as
part of the annual Strategic Housing Investment Plan report. 
5.4. Housing and Technical Resources will continue to actively monitor national context
and consider any further proposals that may be appropriate to acquire properties to
help increase the supply of affordable housing and meet identified housing needs. 
5.5. Any future proposals to further develop the scheme will be reported to the Housing
and Technical Resources Committee for approval. 
6. Employee implications
6.1. There are no employee implications associated with this report. 
7. Financial implications
7.1. Homes acquired by the Council through the Open Market Purchase Scheme qualify
for Scottish Government grant funding and based on current projections, will
positively contribute to the Housing Revenue Account Business Plan once acquired. 
7.2. Financial implications relating to the delivery of the OMPS, as part of the wider
Home+ Programme, will continue to be monitored and adjusted as part of the
Strategic Housing Investment Plan and Housing Revenue and Capital Account
Budget, both reported to the Housing and Technical Resources Committee on an
annual basis.   
8. Climate Change, Sustainability and Environmental Implications
8.1. The contents and proposals within this report link with key strategic priorities of the
Local Housing Strategy.  As part of the development of the Local Housing Strategy
2022 to 2027, a full Strategic Environmental Assessment (SEA) was undertaken with
the report submitted to the SEA Gateway and published online for consultation. 
8.2. This assessment identified that the specification for future housing projects will
contribute to improved energy efficiency standards and therefore make a positive
contribution to local and national sustainability and climate change targets. 
9. Other implications
9.1. There are no other implications as a consequence of this report. 
10. Impact Assessments and Consultation arrangements
10.1. Equality Impact Assessment (EqIA) processes were undertaken throughout the
development of the Local Housing Strategy 2022 to 2027 to identify and mitigate any
negative impacts and seek opportunities to promote equality.  This identified the
Local Housing Strategy 2022 to 2027 will have no negative impacts on any protected
characteristics groups and will have significant positive impacts in relation to age and
disability. 
10.2. The OMPS, as part of the wider Home+ programme, remains a key aspect of the
Local Housing Strategy’s priority to increase the supply of affordable housing across
South Lanarkshire.  As part of the development of the Strategy, a range of
consultation activities were completed with internal and external partners as well as
members of the public.   
Stephen Gibson
Executive Director (Housing and Technical Resources)
57

Page 58

22 November 2022 
Links to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Achieve results through leadership, good governance and organisational effectiveness
 Making communities safer, stronger and sustainable
 Improve the availability, quality and access of housing
 Work with Communities and Partners to promote high quality, thriving and sustainable
Communities. 
Previous References
 Housing and Technical Resources Committee, 1 July 2015
 Housing and Technical Resources Committee, 17 February 2021 
List of Background Papers
 South Lanarkshire Strategic Housing Investment Plan 2023-2028 
Contact for Further Information
If you would like further information, please contact:-
Annette Finnan, Head of Housing Services, Housing and Technical Resources
Ext:  4595 (Phone: 01698 454595)
E-mail:  Annette.Finnan@southlanarkshire.gov.uk 
58

Page 59

Appendix 1 
Table 1: Proposed amendment to existing OMPS criteria
Current position  Background to Amendment Amendment
Long-term empty properties 
The current criteria for the OMPS
requires that a property has been
empty for a period of at least 24
months, as determined by council
tax records, in order that  the
property may be considered by the
council for purchase, without being
actively marketed for sale. 
In 2019, following the introduction
of new legislation to tackle empty
homes across Scotland, the council
introduced an Empty Property
Surcharge for properties which
have been empty for a period of 12
months or longer. This equates to a
200% council tax charge being
applied until the property becomes
occupied, with the aim being to
encourage owners to return the
property to use. 
To align with this approach, it is
proposed that the OMPS be
amended to allow properties that
have been empty for a period of
more than 12 months, as
determined by council tax records,
to be considered by the council for
purchase under the scheme,
without being actively marketed for
sale.
Allow properties which are not being
actively marketed for sale and which
have been empty for a period of
more than 12 months, as determined
by council tax records, to be
considered by the council for
purchase under the scheme. 
Table 2: Proposed additions to existing OMPS criteria
Current position  Background to Additional
Criteria New Criteria
Contact with agents and private
owners
The council currently engages with
estate agents and other property
professionals to facilitate the
identification of suitable properties for
purchase under the OMPS. 
Whilst this will continue, it is
proposed to expand the
existing OMPS scheme to
allow owner occupiers and
private landlords of former
council properties to contact
the council directly with the
offer of property for sale. 
To be eligible for consideration, 
these properties will require to 
align with the existing criteria of
the scheme as noted at section
3.3, and the sellers would have
to provide the council with a
valid home report for review
prior to entering into
negotiations. 
Allow owner occupiers and
private landlords of former
council properties to contact
the council directly with the
offer of property for sale.
59

Page 60

Current position  Background to Additional
Criteria New Criteria
Engage with landlords of properties
in the Private Leasing Scheme 
The council currently leases 120 
properties from landlords in the 
private rented sector through the 
Private Leasing Scheme (PLS) which 
assists in meeting demand and 
service requirements within some 
areas of South Lanarkshire.
Principally these properties are used
to augment the council’s temporary 
accommodation portfolio for 
homeless households and support 
achievement of the council’s 
statutory requirements.
Under the current PLS 
scheme, any lease is agreed 
for 2 years with a breakpoint
every 6 months where the 
council or landlord can break 
the lease. This breakpoint 
would serve as an appropriate 
opportunity to discuss the 
purchase of the property 
where suitable and a landlord
has indicated that they wish to 
end the lease. 
To allow acquisition of PLS
properties, guidance and
procedures would be
developed to ensure
appropriate consideration is
given to the impact on the
wider supply of temporary
accommodation. 
Enable the council to engage
with private landlords who
currently lease properties to the
council, and no longer wish to
remain in the sector, to
purchase their properties
directly from them. 
60

Page 61

Report 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Notification of Use of Standing Order 37(c) – Lease of
26 Units within the Former Student Residencies at 2
Barrack Street, Hamilton for the Purposes of
Accommodating Ukrainian Refugees and Resettlement 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee on the use of Standing Order No 37(c) which was approved
due to the timescales involved and the urgent requirement to enter into a lease
agreement to provide accommodation for refugees, at 2 Barrack Street, Hamilton
[1purpose]
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):- 
(1) that the Executive Director (Housing and Technical Resources) was
authorised to lease the subjects at 2 Barrack Street, Hamilton to meet the
identified housing needs for Ukrainian refugees, on the principle terms and
conditions set out in Section 4 of this report, be noted; and 
(2) that authority was granted to the Executive Director (Housing and Technical
Resources), in conjunction with the Head of Administration and Legal
Services, to conclude matters and to enter into the necessary legal
agreements on terms which are in the best interests of the Council, be noted. 
3. Background
3.1. In March 2022, the UK Government established the Homes for Ukrainian Scheme to
enable individuals fleeing the conflict in the Ukraine to move to and secure
accommodation in the United Kingdom.  The Scottish Government established the
‘Scottish Super Sponsor’ Scheme to assist individuals seeking to move to Scotland
by selecting the Scottish Government as their sponsor. 
3.2. South Lanarkshire Council, along with other local authorities, plays a key role in the
delivering of the scheme and currently operates a welcome hub on behalf of the
Scottish Government providing temporary accommodation and support to “Ukrainian
Displaced Persons” when they arrive in Scotland.  The Council’s Resettlement Team
works to assist those housed at the hub move towards a more permanent home. 
The Council also plays an important role in carrying out checks on the properties and
backgrounds of individuals who wish to host a Ukrainian refugee. 
12
61

Page 62

There has been an extremely high demand for the Scottish Super Sponsor Scheme
which resulted in the scheme being passed on 13 July 2022. 
3.3. The level of demand has led to significant pressure on the availability of
accommodation and the Scottish Government has written to Councils on a number
of occasions to ask that they consider accommodation options that could be
progressed to meet the needs of Ukrainian households. 
3.4. Having previously utilised part of the property for temporary accommodation to
support homeless households during the COVID-19 pandemic, Housing and
Technical Resources has identified the subjects at 2 Barrack Street, Hamilton as a
suitable accommodation option. 
3.5. The subjects are vacant following purchase by C&S Facilities Management Limited
from the University of West of Scotland in 2022 and offer 26 accommodation units
with 6 individual rooms in each, split over 3 separate blocks. 
It has been agreed that the lease and all associated services relating to the
proposed accommodation at 2 Barrack Street, Hamilton are to be delivered at no
overall cost to South Lanarkshire Council. 
3.6. The proposal is to utilise the subjects at 2 Barrack Street, Hamilton as interim
accommodation for parties currently residing in short term, ‘welcome hub’ hotel
accommodation, whilst continuing to be supported to find settled accommodation in
South Lanarkshire or elsewhere. 
3.7. Following positive discussions with the subject owners and the Scottish Government,
Housing and Technical Resources entered into negotiations with C&S Facilities
Management Limited for the lease of occupation of 26 units, within the former
student residencies at Barrack Street, Hamilton for use by the Council for the
purposes of interim accommodation of up to 200 Ukrainian refugees. 
4. Proposal
4.1. The following terms and conditions have been agreed with C&S Facilities
Management Limited: 
1. Lease duration:  for a period of 1 year
2. Break options:  mutual 6 months subject to 28 days’ notice
3. Use:  refugee interim accommodation
4. Date of entry: 2nd November 2022
5. Rent.   £21,450 per month (£257,400 per annum)
6. Deposit:  3 month rent deposit (£64,350)
7. Rates/Council tax: Council, as lease responsible for any Council
tax/Business rates 
8. Extension: Tenant only 1 year renewal option exercisable 3 months
prior to expiry date 
9. Fees: All costs, legal fees and outgoings incurred by the
Council to be met by Scottish Government 
4.2. The cost of the works required to bring the internal accommodation up to a standard
suitable for letting, which will be carried out by the Landlord, will be recharged to the
Council and reimbursed by Scottish Government and the Homes for Ukraine Tariff
Grant. 
62

Page 63

5. Employee Implications
5.1. An externally commissioned service will be utilised to manage the building and
support the occupants throughout the duration of the lease.  Existing resources
within Housing and Technical Resources will also be utilised to provide support to
occupants. 
6. Financial Implications
6.1. The lease and all associated services relating to the proposed accommodation at 2
Barrack Street, Hamilton are to be delivered at no overall cost to South Lanarkshire
Council. 
6.2. A grant will be provided by the Scottish Government to the Council of up to £820,000
to cover the costs of the project, however, actual grant received will be based on the
actual costs incurred by the Council for the duration of the accommodation offer. 
Opportunities to attract funding from the Homes for Ukraine Tariff Grant will also be
explored for eligible occupants of the accommodation. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising
from this proposal. 
8. Other Implications
8.1. The lease of the subjects enabled by this report will ensure South Lanarkshire
Council continues to actively contribute to the Scottish Government’s national
response to the Ukraine crisis.   
8.2. There are no significant risks associated with this report. 
8.3. Normal Council protocols to ensure that there are no conflicts of interest apply to this
scheme. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy and therefore no
separate impact assessment is required. 
9.2. No formal consultation process was required in terms of the recommendation
contained in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
22 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live 
Previous References 
♦ None 
List of Background Papers
 Internal Briefing Paper ‘ Ukrainian move on accommodation proposal’, Annette Finnan
Head of Housing Services, 21 July 2022 
63

Page 64

Contact for Further Information
If you would like further information, please contact:-
Annette Finnan, Head of Housing Services, Housing and Technical Resources
Ext:  4595 (Phone: 01698 454595)
E-mail:  Annette.Finnan@southlanarkshire.gov.uk
64

Page 65

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Disposal of Montrose House, Montrose Crescent,
Hamilton, ML3 6LB 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval for the disposal of the site of the former Council Offices at
Montrose House, Montrose Crescent, Hamilton to AC Land Regeneration Limited
(or assignees or nominees)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Montrose House, Montrose Crescent, Hamilton on a site extending to
0.591 hectares (1.48 acres) or thereby, as detailed within Appendix 1, be
disposed of to AC Land Regeneration Limited (or assignees or nominees) for
the sum of £205,000 exclusive of VAT and in terms of the principal conditions
contained in Section 4 of this report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to
conclude all other matters pertaining to the disposal of the site and to enter
into the necessary legal agreements on terms which are in the best interests
of the Council 
[1recs]
3. Background
3.1. The property is located within the Hamilton West area, adjacent to the Council’s
Headquarters and approximately 1.5 miles from Hamilton town centre and is
surrounded by a mix of residential and commercial properties.  It is a detached 3
storey building and includes 76 car parking spaces. 
3.2. The introduction of more agile ways of working led to a reduction in the floorspace
requirements for office accommodation for the Council.  On the basis of this,
Montrose House, Montrose Crescent, Hamilton formerly used by the Council as
office accommodation, was declared surplus by the Executive Committee at its
meeting on 2 March 2022. 
3.3. The property was marketed with a closing date of 8 July 2022.  One offer was
received, that being an offer of £205,000 from AC Land Regeneration Limited who is
considering a range of redevelopment options for the site, however, initially focusing
on use as a rental opportunity for 1 of its businesses. 
13
65

Page 66

3.4. AC Land Regeneration Limited was founded on 28 July 2021.  The company
specialises in property development and is a sister company of Advance
Construction (Scotland) Limited who specialises in the construction of domestic
buildings. 
3.5. The property is largely vacant with the majority of staff relocated to Headquarters.  A
project is underway to relocate the remaining services to other locations. 
4. Proposal
4.1. The current proposal, which is subject to detailed planning consent, is to redevelop
the building and rent it out as commercial premises although other uses are still
being considered. 
4.2. AC Land Regeneration Limited has offered terms to purchase the Council’s interest
for £205,000 exclusive of VAT.  The offer is conditional only on satisfactory Title
which the bidder has informally advised was satisfactory to them upon carrying out
its initial due diligence. 
4.3. It is proposed to dispose of Montrose House, Montrose Crescent, Hamilton
extending to 0.591 hectares (1.48 acres) or thereby, as shown on the attached
indicative plan, to AC Land Regeneration Limited (or assignees or nominees) subject
to the following principal conditions:- 
1. the purchase price to be £205,000 exclusive of VAT
2. the offer will be subject to satisfactory Title
3. the purchasers to meet the Council’s reasonably incurred legal fees 
5. Employee Implications
5.1. Some staff within Montrose House are still to be relocated to alternative premises to
allow Montrose House to be sold with vacant possession. 
5.2. Arrangements have already been made for the redeployment of facilities
management staff and Council officers will be redeployed when the building fully
closes. 
6. Financial Implications
6.1. Disposal of the property will generate a receipt of £205,000 (2 hundred and 5
thousand pounds), subject to satisfactory Title, for the Council’s capital programme
in year 2023/2024.   
6.2. The current annual running costs for the building are in the region of £400,000 per
annum.  The disposal will remove this ongoing revenue liability. 
6.3. Due to the largely unconditional nature of the offer to purchase, the Council will be
able to mitigate against property costs and liabilities associated with holding vacant
property and achieve the ongoing savings earlier than in the case of a sale suspensive
on planning consent for alternative use. 
7. Other Implications
7.1. The risk of not proceeding with this proposal would have adverse implications for the
Council.  A capital receipt for the Council’s non-housing programme would fail to
materialise. The Council would remain liable for a dilapidated asset with associated
empty property costs and the possible cost of future demolition. 
66

Page 67

8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and environment
contained within this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Consultations with Planning, Housing, Roads and Legal Services will take place as
and when the anticipated change of use goes through the planning application
process. 
9.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable 
Previous References
 Executive Committee, 2 March 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 845 4073)
email: joanne.forbes@southlanarkshire.gov.uk  
67

Page 68

68

Page 69

Report
Agenda Item 
Report to:  Housing and Technical Resources Committee 
Date of Meeting:  14 December 2022
Report by:  Executive Director (Housing and Technical Resources) 
Subject:  Disposal of Vacant Domestic Dwelling House at
49 Nevis Avenue, Hamilton, ML3 8UB 
1.  Purpose of Report 
1.1.  The purpose of the report is to:- 
♦ seek approval to declare the vacant property at 49 Nevis Avenue, Hamilton
surplus to the operational requirements of Housing Services and progress
its disposal 
2.  Recommendation(s) 
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the vacant property at 49 Nevis Avenue, Hamilton, as detailed within
Appendix 1, be declared surplus to the operational requirements of Housing
Services;
(2) that the Executive Director (Housing and Technical Resources) be authorised
to progress disposal of the property from the Housing Account, through the
Council’s normal surplus property procedure; and 
(3) that the Executive Director (Housing and Technical Resources), in
consultation with the Head of Administration and Legal Services, be
authorised to conclude all matters in respect of any subsequent disposal and
enter into the necessary legal agreements in terms which are in the best
interest of the Council 
3. Background 
3.1.  The property at 49 Nevis Avenue, Hamilton was acquired by South Lanarkshire
Council in 2000 and comprises of a 3 bedroom mid-terraced property. 
3.2.  The property was constructed in 1975 within an estate formerly owned by Scottish
Special Housing Association.  Latterly, the estate consists of a majority of privately
owned properties as well as a number of properties owned and let by Clyde Valley
Housing Association. 
3.3.  The property was initially purchased by the Council to be utilised as temporary
homeless accommodation, meeting demand and requirements for the service at that
time. 
14
69

Page 70

3.4. In 2013, the property ceased being used as temporary homeless accommodation
due to the resulting management issues within this locale and has been let as a
mainstream property since this time.   
4. Current position
4.1. The property is currently vacant and is situated outwith a Council managed area. 
4.2. Given the Council does not own any other housing stock in this locale, the property
no longer fits with the Council’s property portfolio for management and investment
purposes and it is therefore recommended that the property be declared surplus. 
5. Next Steps 
5.1. Following approval from the Housing and Technical Resources Committee, officers
will be instructed to declare the vacant property at 49 Nevis Avenue, Hamilton
surplus, and market the property for sale on the open market. 
6. Employee Implications  
6.1.  There are no employee implications arising from this report. 
7. Financial Implications 
7.1.  Disposal of the property will generate a capital receipt which will contribute to the
Housing Revenue Account’s Capital Programme. 
7.2.  Disposal of this property will reduce the Council’s liability in terms of management
and maintenance. 
8. Climate Change, Sustainability and Environmental Implications 
8.1.  There are no climate change, sustainability, environmental or risk implications in
terms of the information contained within this report. 
9.  Other Implications
9.1.  There are no other implications in terms of the information contained within this
report. 
10.  Equality Impact Assessment and Consultation Arrangements 
10.1.  This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
10.2.  There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 November 2022 
Link(s) to Council Values/Priorities/Outcomes
♦ Good quality, suitable and sustainable places to live
♦ Accountable, effective, efficient and transparent 
Previous References 
♦ None 
70

Page 71

List of Background papers 
♦ None 
Contact for further information 
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services 
Telephone: 01698 454073
Email:  joanne.forbes@southlanarkshire.gov.uk  
71

Page 72

Appendix 1 
72

Page 73

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Stonefield Pitches, Blantyre – Asset Transfer to
Blantyre Victoria Youth Football Club 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for asset transfer, by lease, of the pitches at
Stonefield Road, Blantyre to Blantyre Victoria Youth Football Club and request
approval to the principal terms and conditions of asset transfer as set out in Section
5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the pitches at Stonefield Road, Blantyre be leased to Blantyre Victoria Youth
FC subject to the terms and conditions outlined in Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The pitches and pavilion at Stonefield Road, Blantyre are currently managed by South
Lanarkshire Leisure and Culture (SLLC). 
3.2.  Blantyre Victoria Youth FC is the principal user of the pitches and has aspirations to
develop long-term proposals for both the pitches and the pavilion, however, is seeking
a lease of the pitches as a first stage. Blantyre Victoria Youth FC submitted a request
for Community Asset Transfer, the validation date for which was 11 May 2022. 
3.3. The initial request included the pavilion, however, in light of issues associated with the
relocation of electric equipment within the pavilion, Blantyre Victoria Youth FC has
withdrawn this aspect at the moment.  The request being considered, therefore, is for
the pitches alone, as shown on Appendix 1. 
3.4. In addition to placing the application and supporting documentation on the Council’s
Planning Portal, notices were placed on the property advising that the Council was
considering an asset transfer.  The closing date for responses was 24 June 2022 at
which time 58 responses were received, 52 positive, 1 neutral and 5 negative. 
15
73

Page 74

The negative responses highlight concerns regarding reduced local access for dog
walking and the loss of green areas by the community if the transfer takes place.
One football club objected after the closing date. 
3.5. The request was placed before the Community Asset Transfer Assessment Panel on
30 September 2022 and 9 November 2022 when the following matters were taken into
consideration. 
3.6. Property
3.6.1. The extent of the property requested, is shown on the attached plan and as there is
no change of use or development, proposed planning consent will not be required. 
3.6.2. The pitches are currently leased to SLLC and this arrangement will require to be
amended to enable the lease to proceed.  An income in the region of £13,300 per
annum can be generated from the let of the pitches. 
3.6.3. The Council is responsible for the ground’s maintenance and this costs in the region
on £11,400 per annum. 
3.7. Organisation
3.7.1. Blantyre Victoria Youth FC is an unincorporated organisation controlled by a
management committee which is elected at its AGM.  The organisation, previously
known as Lanarkshire Sports Club, became Blantyre Victoria Youth FC in 2016. 
3.7.2. The purpose of the organisation is the advancement of sport and fitness and to
provide people in Blantyre and the wider area with the opportunity to play association
football.
3.7.3. The organisation is managed by a Board of 10 and has over 200 members, with
potential to expand. 
3.8. Project
3.8.1. The proposal is for Blantyre Victoria Youth FC to formally have exclusive use and
management of the pitches which will enable the development of a sustainable
community business model for the longer term through delivery of a community
training facility and greater participation in football for all.  The grant of a year-to-year
lease will allow the organisation to evidence the community benefits and develop
proposals for a future, longer term agreement. 
3.8.2. The organisation will continue to use facilities at the nearby Blantyre Victoria Junior
Stadium with whom it has an affiliation. The organisation has confirmed that it will have
in place arrangements that will enable other organisations to book the pitches. 
3.8.3. The business plan submitted in support of the application shows that savings to the
organisation and booking fee income will cover the costs associated with the pitch
maintenance. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity to
further develop. 
4.2. The community benefits anticipated from the proposal relate to health and wellbeing,
education, environmental and recreation. 
74

Page 75

4.3. The Community Asset Transfer Working Group assessed the potential community
benefits and recommended that a discount of 93% be applied to the market rental
value to reflect the benefits to the community.  The majority of the Council’s leases to
unlicensed sports clubs are at £1 per annum on the basis that all maintenance is
undertaken by the tenant and is to a satisfactory standard, therefore, there is no market
rental figure. 
4.4. If the lease is on an annual basis, there is a loss of income to SLLC and a gain from
reduction to ground maintenance to SLC.  Across the 2 organisations the net effect is
minimal at £1,900 loss.  However, it is considered essential that there is clear evidence
of delivery of the community benefit to offset this loss. 
4.5. The risks associated with the asset transfer are considered low, given that the request
is for a year-to-year lease.  The key concerns are that the land is maintained to a high
standard and that there is evidence of benefits to the local community.  Therefore, it
is proposed that annual renewal of the lease will be dependent upon an annual
inspection of the ground conditions and a report from Blantyre Victoria Youth FC
evidencing the increased outcomes from control of the pitch passing to the
organisation. 
5. Proposal
5.1. It is proposed to lease the pitches at Stonefield Road, Blantyre, as shown on the
attached plan, to Blantyre Victoria Youth FC, on the following principal terms and
conditions:- 
1. The lease will be to Blantyre Victoria Youth FC
2. The lease will be for a period of 1 year  
3. The date of entry to be agreed
4. The rental shall be £1 per annum 
5. The lease to be fully repairing and insuring, 
6. The tenants will be required to obtain and exhibit as required public liability
insurance to the value of £5 million for any one claim.
7. The property will be used in conjunction with the tenant’s activities as a football
club
8. The tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
9. Assignation and subletting will not be allowed without the Council's express
consent 
10. Each party to be responsible for their own legal costs however the tenants will
require to pay any registration fees and Land & Buildings Transaction Tax
(LBTT) if required 
5.2. Any annual renewal of the lease will be conditional upon:- 
1. Satisfactory ground condition inspection by Land Services
2. Submission of a report evidencing delivered community benefits by Blantyre
Victoria Youth FC 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The asset transfer will result in a loss of income to SLLC of £13,300 per annum.  It will
also result in a reduction in the costs to the Council of maintaining the land equating
to around £11,400. 
75

Page 76

8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council had until
11 November 2022 to provide a notice of its decision whether to agree to or refuse the
asset transfer request, however, Blantyre Victoria Youth FC agreed an extension to
the date of the Housing and Technical Resources Committee. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale or the asset transfer request be refused. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the SLLC, Land Services, Planning, Legal and
Finance Services as well as having been published for public consultation. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
76

Page 77

77

Page 78

78

Page 79

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Update of the Housing and Technical Resources Risk
Register and Risk Control Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-
]
 provide an update to Committee on the Risk Register and Risk Control actions for
Housing and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the contents of the Resource Risk Register, be noted; and
(2) that the outstanding Risk Control Actions, be noted.
[1recs]
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision making processes.  The strategy requires Resources
to record and review risks and control actions regularly.  Housing and Technical
Resources follows the guidance in developing, monitoring and updating the Risk
Register on an ongoing basis. 
3.2. The purpose of the register is to ensure that the Resource is fully aware of its top
risks, that these risks are prioritised and that controls are in place to eliminate or
minimise the impact of the risks. 
3.3. The Resource scores the risks in accordance with the Council scoring mechanism,
based on likelihood and impact.  This results in risks being scored between 1 and 25
(low to very high). 
3.4. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls).  The Council’s scoring matrix is attached at Appendix 1. 
3.5. The last update of the Housing and Technical Resources Risk Register was reported
to Committee on 29 September 2021.   
3.6. The Resource’s top Risk Register and risk control plan has been reviewed.  This
work was completed in August 2022. 
3.7. The Central Risk Management Team annually reviews Resource compliance with
the Risk Management Strategy.  The outcome of the 2021/2022 review identified that
Housing and Technical Resources achieved 100 per cent compliance, scoring 45 out
of a possible 45.
16
79

Page 80

4. Resource Risk Management
4.1. Each Resource has a Resource Risk Management Group which has responsibility
for the promotion and management of risk.   
4.2. The Housing and Technical Resources Risk Management Group continues to meet
on a regular basis.   
4.3. The work of the Group over the last year has focused on the review and update of
the Resource Risk Register and ensuring that the register reflected the Council Plan
and individual Service Plans.   
5. Risk Register
5.1. Work has been completed by the Resource Risk Management Group to finalise the
review of the Resource Risk Register.  The update gave consideration to risks at a
Service level, as well as strategic Council risks. 
5.2. The Resource Risk Register is monitored on an ongoing basis to allow new risks to
be added and for the control measures and scores of the existing risks to be
reviewed in light of new information.   
5.3. Risks can result from internal or external influences, with examples being the impact
of projected funding cuts, legislative changes or the impact of internal service
changes. 
5.4. The development process for the Resource Plan requires a risk assessment process
to be undertaken as appropriate resulting in some actions within the Resource Plan
having a corresponding risk identified within the Risk Register.   
5.5. The main changes to the register are summarised below:- 
 four new risks have been added:- 
♦ the Council fails to support households significantly impacted by the cost-
of-living crisis, resulting in increasing levels of poverty, debt and damage to
health 
♦ the Council fails to deliver the objectives of the Community Wealth Building
Strategy 
♦ inability of partners to effectively accommodate and support households who
arrive in South Lanarkshire as part of refugee resettlement and the asylum
seeker dispersal programmes 
♦ failure to achieve the outcomes of the Council Plan 
 the ‘Homes+’ programme risk has been updated to make reference to material
supply issues and the impact influenced by ongoing global factors 
 the ‘Failure to provide suitable temporary and settled accommodation for
homeless applicants’ risk has been updated to reflect the review of the
temporary accommodation portfolio 
80

Page 81

 the ‘Fire in Council Properties’ risk has been updated to include published
Scottish Government practical fire safety guidance which applies to ‘specialised
housing’ and similar premises that are provided for older people and others
requiring care and support. This includes sheltered housing services provided by
the Council. Tenants within mainstream Council properties who receive a ‘care
at home’ service are also covered by aspects of the guidance. High rise domestic
buildings and other specialist accommodation, including Gypsy/Traveller sites,
are covered by separate guidance and legislation 
 the risk description on ‘Funding’ has been updated to reflect the level of
Government grant received, inflationary increases, rising energy costs, reduced
income (cost-of-living crisis) and greater pressure on council budgets 
 the ‘pandemic’ risk description has been refocused to consider potential future
events and residual effects of the current pandemic being managed at
Resource level.  The residual risk score has been reduced from 16 to 12 
 the ‘sustainable development and climate change’ risk has been updated to
reflect the recently approved strategy and the impact of capital budget
spend/funding on zero carbon targets. This risk has increased from 6 to 12 
 the ‘procurement’ risk has been updated to reflect issues relating to the supply
chain, cost of materials and the stability of tender market prices.  The risk score
has increased accordingly from 9 to 12 
 the ‘extreme weather’ risk has been updated to cover droughts/water supply
issues and wildfires 
 the Brexit risk card has been removed from the register with residual actions
have been added to the procurement risk card 
 risk descriptions, controls and actions have been updated as required on
individual risks, following discussion with risk owners 
5.6. Risks scored 15 to 25 are considered to be very high risks and risks scored eight to
12 are considered to be high risks.  Very high and high risks are monitored closely. 
The top risks identified for the Resource, that is those that are residually scored as
being very high and high, are attached at Appendix 2. 
5.7. Appendix 3 provides a comparison of risk scores for 2021 and 2022.  This Appendix
also details changes in risk descriptions. 
5.8. Risks evaluated residually as being medium or low risk will be monitored to ensure
that they continue to be adequately managed. 
6. Insurance Hotspots
6.1. Following the completion of claims analysis reports by insurers, various areas of
work have been identified to mitigate insured losses. Those which affect Housing
and Technical Resources include a property insurer survey programme; awareness
raising and advice to tenants in respect of council house fires, ongoing development
of driving at work training and a health and safety training review to be undertaken
by the Council’s claims handlers. 
6.2. Progress with implementation and effectiveness of actions will be reported back to
the Committee, via the Risk and Audit Committee insured risks reports.
81

Page 82

7. Scope and Appetite for Risk
7.1. The Council aims to be risk embracing, that is it will accept a tolerable level of risk in
seeking service efficiencies and in agreeing control measures. 
7.2. The level of risk facing the Council is measured both before (inherent risk) and after
(residual risk) consideration of controls.  The Council should never carry a very high
residual risk exposure as this would indicate instability but a low residual risk exposure
should also be avoided as this indicates lack of innovation. 
7.3. The Council’s universal risk tolerance levels were updated as part of the review of the
Risk Management Strategy last year, with the ideal risk profile defined as:- 
 no more than 10 per cent of residual risks at a very high level
 no more than 15 per cent of risks at a high level
 around 50 to 60 per cent of residual risks at a medium level
 no more than 30 per cent of residual risks at a low level 
7.4. Table 1 below shows the top risks heat map, ie, it details the total number of risks for
each individual residual risk score.  Table 2 below notes the overall risk profile for the
top risks. 
Table 1 – Housing and Technical Resources Top Risks Heat Map 
Likelihood
5
Almost Certain    2 
4
Likely   4  
3
Possible  10 2 1 
2
Unlikely  5  3 
1
Rare     
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table 2 – Housing and Technical Resources Risk Profile 
Risk
Category
Risk Rating Number of
residual risks
Percentage of
residual risks
1 Very high 2 7.4%
2 High 10 55.6%
3 Medium 15 37.0%
4 Low 0 0.0% 
7.5. The profile noted in Table 2 is outwith the ideal universal risk exposure defined by the
Risk Management Strategy, however, this risk exposure is considered reasonable
given the number of high level risks currently being faced by the Resource. 
7.6. Housing and Technical Resources has ensured that all inherent risks scored at a
very high and high level have cost effective control measures in place.  Where
further control measures are required, these are included within the Resource Risk
Control Plan. 
82

Page 83

8. Risk Control Actions
8.1. No risk control actions were due for delivery between April and August 2022. 
8.2. There was 1 risk control action due for completion in 2020/2021 (Affordable Housing
Supply Programme – failure to increase supply of affordable homes by completion of
1,000 new council houses), however, as a result of COVID-19, the target was
revised with the Scottish Government to completion during 2021/2022. 
9. Major Projects, Partnerships or Change
9.1. Within Housing and Technical Resources 2 partnerships have been identified.  Both
of these are considered to be low risk. 
9.2. Appropriate risk management arrangements are in place for the Community Safety
Partnership and Hub SW Partnership. 
10. Next Steps
10.1. The Resource Risk Management Group will continue to meet on a regular basis. 
The Risk Register will be reviewed on an ongoing basis by the Group to ensure that
risks remain valid for the appropriate Service areas and to identify new areas of risk
that affect the Resource.  An update report will be provided to Committee on an
annual basis.   
11. Employee Implications
11.1. Time will be required by the Resource Risk Management Group in the management
of the Resource Risk Register and Risk Control Plan. 
12. Financial Implications
12.1. There are no direct financial implications associated with the Resource’s top risks. 
There are a number of proposed risks which are classified under the heading of
financial.  Where this is the case, the appropriate controls and actions have been
included in the risk control cards and progress will be monitored. 
13.  Climate Change, Sustainability and Environmental Implications 
13.1. Sustainable development issues are included within the Council’s top Risk Register
through being linked directly to the Council Plan Objective ‘make communities safer,
stronger and sustainable’. 
14. Other Implications
14.1. Failure to demonstrate that risk is actively considered and managed cannot only lead
to avoidable financial loss but could also affect delivery of services and could affect
the Resources’ reputation. 
15. Equality Impact Assessment and Consultation Arrangements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore, no impact assessment
is required. 
15.2. Consultation on the content of this report has been undertaken with the Resource
Management Team. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
22 November 2022
83

Page 84

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 21 September 2021 
List of Background Papers
♦ None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Cameron Mitchell, Strategy and Support Manager
Telephone: 01698 454862
Email:  cameron.mitchell@southlanarkshire.gov.uk 
84

Page 85

Appendix 1 – Risk scoring matrix and likelihood and impact definitions 
Likelihood 
Score 1 2 3 4 5
Description Rare   Unlikely  Possible  Likely Almost
certain 
Likelihood of
occurrence
1 in 10 years 1 in 3 years 1 in 2 years Annually Monthly
Probability of
occurrence
The event may
occur in certain
circumstances
The event
could occur
The event may
occur
The event will
probably occur
The event is
expected to
occur or
occurs
regularly 
Impact 
Reputation Financial Service delivery/
Time to recover
Compliance Safety
1
Negligible
Public concern
restricted to
local
complaints
<£50,000 per
annum
No impact to
service quality;
limited disruption
to operations.
No external
interest
Minor injury
– no lost
time
2
Minor
Minor adverse
local/public/me
dia attention
and complaints
£50,000-
£250,000 per
annum
Minor impact to
service quality;
minor service
standards are not
met; short term 
Very minor
attention
from
legislative
/Regulatory
body
Minor injury
– resulting
in lost time
3
Moderate
Adverse
national media
Public attention
£250,000 to
£500,000 per
annum
Significant fall in
service quality;
major partnership
relationships
strained; serious
disruption in
service standards
Short-term
attention
from
legislative/
regulatory
body 
Major injury
or ill health
resulting in
lost time
4
Major
Serious
negative
national or
regional
criticism
£500,000 to
£1million per
annum
Major impact to
service delivery;
multiple service
standards are not
met; long term
disruption to
operations;
multiple
partnerships
affected
Medium-term
attention
from
legislative/
regulatory
body 
Fatality;
Or injuries
to several
people
5
Catastrophic
Prolonged
international,
regional and
national
condemnation
>£1million per
annum
Catastrophic fail
in service quality
and key service
standards are not
met; long term
catastrophic
interruption to
operations;
several major
partnerships are
affected
National
impact with
rapid
intervention
of legislative/
regulatory
body 
Multiple
fatalities; Or
injuries to
large
number of
people 
The assessments for impact and likelihood combine to provide an overall inherent risk score on the
scale of between 1 and 25, using the Council’s recognised risk matrix. 
85

Page 86

Risk matrix
Likelihood
5
Almost
Certain
5 10 15 20 25
4
Likely 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Unlikely 2 4 6 8 10
1
Rare 1 2 3 4 5  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
The risk score is calculated as follows: 
Likelihood score x Impact score = Risk Score 
86

Page 87

Appendix 2 
Housing and Technical Resources Risk Register (as at 31 August 2022)
Extract of risks with residual score category of Very High and High 
Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
1
Very High
(15-25) 
Reduction in external funding and
fees/income received by the Council, as
well as the increased demand for services
including the residual impact of the
pandemic, and the increased cost of
services due to rising inflation and the cost
of living crisis, results in increasing budget
gaps. 
The Council is seeing considerable
increases in prices in terms of energy, fuel
and supplies reflecting the global economic
environment.  These will have an impact on
the current and future years’ Budget
Strategy.  This may also affect the level of
service that the council can provide. 
(Council Top Risk) 
• Failure to deliver key services /
projects
• Failure to achieve Resource savings
targets
• Failure to collect Rent/income
• Increased level of arrears
25 • Embedded structure and systematic approach
to savings identification.
• Revised working arrangements and
deployment of staff resources.
• Close partnership working with Department for
Work and Pensions and other agencies.
• Robust rent collection and arrears management
processes to reflect all circumstances.
• Robust arrangements in place to monitor
service delivery and outturns against budgets.
• Regular reporting to Housing and Technical
Resources Committee and Corporate
Management Team.
20
87

Page 88

• Failure to effectively manage the
processes and practices to reduce
the impact of cost of living crisis
• Extension of Scottish Government
rent freeze/cap beyond 31 March
2023
The Council is unable to support
households most impacted by the cost of
living crisis resulting in increasing levels of
poverty, debt, and damage to health 
(Council Top Risk) 
• increase council tax and rent arrears
• an increase in consumer debt
• an increase in the use of prepaid
energy meters
• detrimental impact on mental and
physical health
25 • Support from Tenancy Sustainment and
Tenant Grant Fund for tenants facing
difficulty paying their rent 
• Provision of housing benefit and
Discretionary Housing Payments support
• Debt and money advice from the Money
Matters Advice Service
• Financial support for those households on
prepaid meters
• Energy support from dedicated energy
advisors
20
2
High
(8-12)
Fire in Council Properties 
• Poor / inadequate fire risk
assessments/precautions
• Failure to adhere to building
regulations/statutory legislative
requirements
• Tenants’ lifestyle
• Tenants’ failure to insure their own
contents 
• Owners failure to insure their own
property
• Building Users behaviour 
• Wilful Fire Raising 
25 • Scottish Fire and Rescue Service (SFRS)
Home Fire Safety Visits encouraged including
at tenancy sign up/within temporary
accommodation/within supported
accommodation, including sheltered housing
• Tenancy Agreement – restrictions 
• Promotion of home contents insurance –
booklet and flyers 
• Joint article to be produced in conjunction with
SFRS and Housing Services for inclusion in
Housing News 
• Ongoing liaison with SFRS and staff training 
12
88

Page 89

• Criminality 
• Faulty electrical equipment
• Failure to maintain plant and
equipment
• Property damage
• Loss of rent
• Financial costs for reinstatement 
• Common Sense Initiative – communal areas
fire safety posters 
• Legislative compliance checks – gas / electrical
etc
• Fire risk assessments.
• Health and Safety audits undertaken
• All new schools have sprinkler or fire
suppression systems 
• Cyclical visits within schools
• Programmes of work to install controlled door
entry systems
• Outcomes of public inquiries
The council does not have the appropriate
emergency / business continuity plans;
contingency arrangements or partnerships
in place to respond to/or recover from a
pandemic/endemic event. 
(Council Top Risk) 
• Lack of robust business continuity
plans/resilience arrangements
• Restriction on service delivery –
statutory and non-statutory 
• Clarity/timing of Government
guidance
• Ineffective communication by
employee and service users 
• Workforce absences/shortage 
• Lack of mobile IT devices
• Lack of PPE
25 • Emergency Response Commitments as a
Category One responder.
• Temporary testing centres identified by
Resource.
• Monitoring of national guidance. 
• Resource / Service Recovery Plans and
Service Restart Framework.
• Business Continuity Plans.
• IT software licences to allow agile working
procured.
• IT – Roll out of Microsoft Teams throughout the
Council.
• IT – Increased numbers of agile workers and
increased number of laptops/tablets.
• Guidance on Health and Safety Risk
Assessments/Safe Systems of Work for Covid-
19 has been issued.
• Introduction of Virtual Call Centre.
• Tenancy Sustainment Fund Assistance. 
• Health and Wellbeing Group established.
12
89

Page 90

Procurement activity is affected by supply
chain issues; a lack of resources; non-
compliance or legal challenge 
(Council Top Risk) 
• Failure to fulfil statutory
requirements 
• Failure to achieve best value.
• Service delivery affected/fails.
• Cyber Attacks - failure to protect our
data systems or assets held by
Council
• Serious organised crime - proceeds
of crime or money laundering
• Lack of trained personnel 
25 • Full contract wording includes SLC
expectations from contractors.
• Guidance on new legislation including the
Bribery Act and the linkages with procurement
issued by Legal Services.  Council has a
security framework in place.
• Contractor vetting (Health and Safety),
construction line and financial checks
undertaken for all contractors.
• Meetings with contractors to review
performance/appraisals.
• iProc used extensively by all Resources.
• Learn online employee training – Quick
quote/procurement awareness.
• Standard procurement documents/processes
held on intranet and reviewed/updated on an
ongoing basis.  These are used consistently
across Resources.
• Review of procedures for financial appraisals.
• Performance monitoring of all significant
contracts.
12
Failure to meet sustainable development
and climate change objectives. 
(Council Top Risk) 
• inadequate or lack of funding 
lead to slippage against targets and
timescales
• failure by the Council to meet carbon
reduction and sustainability targets
20 • Climate change and sustainability governance
(committee and steering group)
• Council's Sustainable Development and
Climate Change Strategy and Action Plan
• Carbon Management Plan
• Long-term capital programme that tackles
climate change mitigation and adaptation
• Energy efficiency investment programmes and
strategic energy reviews of all domestic and
non-domestic properties
• Report 6 monthly to RMT. 
12
90

Page 91

• failure to deliver energy efficiency
would see an increase in tenants
paying more money for fuel to heat
their homes
• SLC Properties will fail to have
energy efficient homes and not meet
EESSH2 compliance.
• Resource energy framework and action plan.
• Energy management software in properties. 
• Renewable energy ie new house build
programme
• Environmental projects
• Reduction in carbon emissions, zero carbon
targets
• Compliance built into future projects
• Capital budget spend/funding.
The inability of the council to effectively
accommodate and support
households who arrive in South
Lanarkshire as part of refugee resettlement
and the asylum seeker dispersal
programmes. 
(Council Top Risk) 
• Statutory requirements not fulfilled
• Failure to provide suitable
accommodation
• Failure to provide the required
support based on individuals needs 
• Maintain good relationships /
partnerships with National / Local
Governments and Community
Planning Partners
• Failure to resource support
mechanisms required 
16 • Dedicated resources within Housing and
Technical Resources – Resettlement Team to
co-ordinate approach in implementation of
national programmes.
• Established partnership working practices
which are closely monitored at a local and
national level
• A range of partnership structures in place to
support implementation
• Monitoring and reporting to RMT, CMT,
Community Planning Partnership and
Committees
• COSLA Strategic Migration Partnership (SMP)
– partnership meetings attended by appropriate
representatives to co-ordinate and support
delivery of national programmes in asylum and
refugees’ programmes.
12
The Council fails to meet statutory and
legislative duties in respect of public
protection 
16 • Multi-agency child protection committee in
place
• Multi-agency adult protection committee in
place
9
91

Page 92

(Council Top Risk) 
Failure to deliver statutory and legislative
duty to deliver services that protect
everybody within our communities:
• Child Protection
• Adult Protection
• Prevent people supporting terrorism
or extremism (Counter terrorism and
Security)
• Environmental services 
• Multi-agency procedures adopted to provide
guidance to staff
• Multi- agency MAPPA arrangements in place
• Significant case review protocol in place
• Data sharing agreements in place to support
alert messaging and sharing key information
• Multi-agency Prevent case discussions take
place
• Training to raise awareness – Learn on line
modules
• Existing partnership working with Police
Scotland and other organisations (Community
Planning Partnership)
Increasing levels of adverse weather 
(Council Top Risk) 
• Inability of the Council to deliver its
core services
• Failure to maintain Council assets
• Increase in the number of insurance
claims received
• A potential overspend in budget as
the Council responds to
emergencies
• Damage to public and private
property 
16 • Emergency Planning arrangements in place
and contact details updated. 
• Severe Weather Group established to control
the delivery of the service.
• Decant properties identified.
• Additional Labour/Trades identified.
• Additional Plant/Transport.
• Additional stock.
• Additional sub-contractors identified if work
content becomes high.
• Additional admin staff to deal with
calls/enquiries/complaints.   
• Better housing stock though capital
programmes.
• 24 hour control centre.
• General Met Office alerts to Contingency
Planning Officers. 
9
92

Page 93

Health, Safety (including death or serious
injury) and wellbeing of employees; and
protection of service users and members of
the public affected by council operations 
(Council Top Risk) 
• Increased claims intimated against
the council 
• Involvement in Fatal Accident
Inquiries
• Increased employee absence
• HSE Involvement - prohibition
notice, improvement notices.
• Prosecution of
organisation/employee under
Corporate Homicide legislation or
Health and Safety at Work Act.
• Industrial disease claims 
• Historical claims
20 • Occupational Health and Safety Management
System embedded throughout the Council.
• Risk Assessments and Safe Systems of Work
developed and implemented.
• Resource, Service and Trade Union
communication and consultation arrangements
in place.
• Health and Safety Training matrices (Specific
training requirements for employees)
• Claims lessons learned reports.
• Resource and Service Health and Safety
Groups meet on a regular basis within all
Resources. 
• Management of Occupational Road Risk Policy
and associated documents
• Analysis of statistics to identify trends and
advise on mitigations to reduce risks.
• Violent incident reporting procedures.
• Record management and record retention
schedules.
8
Failure to achieve the outcomes of the
Community Plan 
(Council Top Risk) 
• Failure to tackle inequalities in priority
areas 
• Failure to comply with statutory
requirements 
• Failure to improve outcomes for
communities 
20 • Participation in CP Outcomes Lead and
Progress Groups.
• Delivery of Local Housing Strategy and
Strategic Housing Investment Plan
• Safer South Lanarkshire Steering Group
undertake a monitoring role and report
progress regularly to Safer South Lanarkshire
Board.
• Delivery of the Anti-Social Behaviour Strategy.
• Promotion and delivery of Anti-Social
Behaviour services 
8
93

Page 94

• Promotion of Equality and Diversity through
Resource Co-ordination Group 
• Fuel poverty – work towards achieving national
targets 
• Promotion of a community engagement
approach and events
• Cross Resource Security Working Group meet
quarterly 
• Specific targets within Resource plan, reported
quarterly
• Local Child Poverty Action Plan Report 
Failure to achieve the outcomes of the
Council Plan 
(Council Top Risk) 
• Failure to reduce inequalities in priority
areas 
• Failure to comply with statutory
requirements 
• Not improving outcomes for
individuals/families 
20 • Resource Risk Register maintained, monitored
and reported to Committee
• Annual performance reporting and annual
performance spotlights
• Governance arrangements via the Executive
Committee, PRSF and Resource Committees
of the council
• Resource Plan and Service Plans are prepared
annually
• Resource Plans are reported and monitored by
Committee. 
8
94

Page 95

Appendix 3 : Comparison of the 2021 and 2022 Housing and Technical Resources Risk
Register 
Risk
Category
2021 Key risk description 2021
Residual
risk
score 
2022
Residual
risk
score
Change
in
residual
risk
scores
Changes to key
risk descriptions
Very High
(15-25) 
Reduction in external funding
and fees/income received by
the Council, as well as the
increased demand for
services including the
residual impact of the
pandemic, and the increased
cost of services due to rising
inflation and the cost of living
crisis, results in increasing
budget gaps. 
The Council is seeing
considerable increases in
prices in terms of energy, fuel
and supply costs reflecting
the global economic
environment.  These will
have an impact on the
current and future years’
Budget Strategy.  This may
also affect the level of service
that the council can provide. 
20 20  = Wording updated
to reflect
inflationary
increases, energy
costs, reduced
income (cost of
living crisis) and
greater pressure
on council budgets
The council is unable to
support households most
impacted by the cost of living
crisis resulting in increasing
levels of poverty, debt, and
damage to health 
N/A 20 New
Risk 
High
(8-12)
Fire in Council Properties 12 12 = Wording updated
to include
published Scottish
Government
practical fire safety
guidance which
applies to
‘specialised
housing’ and
95

Page 96

Risk
Category
2021 Key risk description 2021
Residual
risk
score 
2022
Residual
risk
score
Change
in
residual
risk
scores
Changes to key
risk descriptions
similar premises
that are provided
for older people
and others
requiring care and
support. 
The council does not have
the appropriate emergency /
business continuity plans;
contingency arrangements or
partnerships in place to
respond to/or recover from a
pandemic/endemic event.
16 12   Wording amended
to focus on
response and
recovery from
future pandemic
events
The inability of the council to
effectively accommodate and
support households who
arrive in South Lanarkshire
as part of refugee
resettlement and the asylum
seeker dispersal
programmes.
N/A 12 New
Risk 
Procurement activity is
affected by supply chain
issues; a lack of resources;
non-compliance or legal
challenge 
9 12  Wording updated
to include Supply
Chain issues
Failure to meet the Council’s
sustainable development and
climate change objectives 
6 12   Wording updated
to reflect approved
strategy and
impact on capital
budget
spend/funding on
zero carbon
targets. 
The Council fails meet
statutory and legislative
duties in respect of public
protection
9 9 = 
Increasing levels of adverse
weather
9 9 = 
96

Page 97

Risk
Category
2021 Key risk description 2021
Residual
risk
score 
2022
Residual
risk
score
Change
in
residual
risk
scores
Changes to key
risk descriptions
Health, Safety (including
death or serious injury) and
wellbeing of employees; and
protection of service users
and members of the public
affected by council
operations
8 8  = 
Failure to achieve the
outcomes of the Council Plan
N/A 8 New
Risk 
Failure to achieve the
outcomes of the Community
Plan
8 8 = 
Medium 
(4-6)
Failure to fulfil emergency
response commitments
befitting the Council’s status
as a Category One
(emergency) responder.
6 6  = 
Information Governance not
subject to adequate control
6 6 = 
Failure to deliver City Deal
projects and realise
anticipated economic benefits
6 6 = 
Failure to achieve results and
demonstrate continuous
improvement, through
leadership, good governance
and organisational
effectiveness
6 6 = 
Failure to deliver the
Council’s “Homes+” council
house supply programme
and impact on ability to meet
housing need
6 6 = Addition - updated
to make reference
to material supply
issues and note
that impact
influenced by
ongoing global
factors. 
The council fails to maximise
the benefits of the
Community Wealth Building
Strategy 
N/A 6 New
Risk 
97

Page 98

Risk
Category
2021 Key risk description 2021
Residual
risk
score 
2022
Residual
risk
score
Change
in
residual
risk
scores
Changes to key
risk descriptions
Failure to implement the new
Integrated Housing and
Property Management
System
6 6 = 
Failure to address fuel
poverty in council houses
6 6 = 
Failure to deliver the
Council's Capital Programme
6 6 = 
Failure to provide suitable
temporary and settled
accommodation for homeless
applicants
4 4 = Addition - updated
to reflect a full
review of
temporary
accommodation
portfolio was
completed and the
development of
temporary
accommodation
standards and
mapping. 
Failure to improve tenants’
sustainability
4 4 = 
Failure to implement Local
Housing Strategy (LHS)
4 4 = 
Failure to implement planned
maintenance programmes
4 4 = 
New and amended legislation 4 4 = 
Failure to ensure the
Corporate Asset
Management Plan is
progressed
4 4 = 
98

Page 99

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Report - Mainstreaming Equality and Diversity
within Housing and Technical Resources 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an overview of progress made in relation to mainstreaming equalities
within Housing and Technical Resources during 2021/2022
 highlight the key actions being progressed during 2022/2023 
2. Recommendation(s)
2.1. Housing and Technical Resources Committee is asked to approve the following
recommendation(s):- 
(1) that the progress made during 2021/2022 and key actions for 2022/2023 in
relation to mainstreaming equalities, detailed in appendices 1 and 2, be noted. 
3. Background
3.1. The Housing and Technical Resources Equality and Diversity Co-ordinating Group
has oversight of progress in relation to the equality and diversity work plan, supporting
a consistent approach to mainstreaming equality and diversity across the Resource. 
3.2. The range of work being carried out across the Resource in relation to
mainstreaming equality and diversity is reported on an annual basis.  The last annual
report, covering the period 2020/2021, was presented to the Housing and Technical
Resources Committee on 8 December 2021. 
3.3. It has been widely recognised that the COVID-19 pandemic has had a
disproportionate impact upon vulnerable and disadvantaged individuals and groups
within communities.  While restrictions had eased, work across the Resource to help
mitigate the impact of COVID-19 on potentially vulnerable customer groups has
remained a focus during 2021/2022. 
3.4. This report provides further details of this work, alongside other activities, progressed
during 2021/2022 and sets out the key priorities to be progressed during 2022/2023. 
4. National and Local Policy Developments
4.1. A New Deal for Tenants - Draft Rented Sector Strategy 
In December 2021, the Scottish Government launched the consultative draft
strategy, ‘A New Deal for Tenants’ which aims to help deliver the Housing to 2040
vision of improving accessibility, affordability choices and standards across the
whole rented sector in Scotland.  The results of the consultation will feed into the
final version of the strategy, with elements of the proposals included within a
Housing Bill to be presented to Parliament in 2023.
17
99

Page 100

4.2. Review of Public Sector Equality Duty 
In December 2021, the Scottish Government published a consultation on the
‘Review of the Operation of the Public Sector Equality Duty (PSED) in Scotland’. 
The Public Sector Equality Duty emanates from the Equality Act 2010, with Scottish
Specific Duties introduced in 2012. 
The Scottish Specific Duties outline the key responsibilities for public bodies and
include statutory requirements to report against Equality Outcomes and to continue
to evidence that decisions relating to policy and practice are properly assessed
against the general duties. 
The Resource contributed to the development of the Council’s response to the
consultation, which was submitted in March 2022.  The Scottish Government and the
Equality and Human Rights Commission are currently reviewing the Scottish Specific
Duties with a view to revising these for 2025, in time for the next Mainstreaming
Equalities reports.     
4.3. Strategic Commissioning Plan (SCP) 2022 to 2025 
During 2021/2022, the Resource worked with colleagues from the Health and Social
Care Partnership to develop the new Strategic Commissioning Plan (SCP) 2022 to
2025.  A Housing Contribution Statement is, as is statutorily required, embedded
within the SCP.  This includes a range of actions identified to support 2 strategic
housing priorities:- 
 suitable and sustainable housing and
 preventing and reducing homelessness 
Broadly defined, the housing actions identified aim to widen access to housing
options, support older and disabled people to live independently at home for longer
and prevent homelessness and its impact by improving access to health and support
services, especially for those with complex needs.  Progress against the actions will
be monitored against identified performance measures.   
4.4. South Lanarkshire Council’s Rapid Rehousing Transition Plan (RRTP)
In 2020/2021, as part of a review of the Council’s Equalities Outcomes, Housing and
Technical Resources identified a new headline Equality Outcome, ‘Prevent
homelessness occurring and significantly reduce homelessness’ for the period 2021
to 2025, with specific actions identified which align to the Rapid Rehousing
Transition Plan (RRTP). 
These actions are routinely monitored and reported on as part of the RRTP annual
review process and progress against the Resource’s Equality Outcomes for 2021 to
2025 is also closely monitored by the Resource Equality and Diversity Co-ordination
Group. 
An update on progress in relation to the Council’s Equality Outcomes and its
approach to mainstreaming equalities will be reported to Executive Committee and
the Scottish Government during 2023. 
4.5. Equality Impact Assessment and the Fairer Scotland Duty 
The Resource continues to undertake Equality Impact and Fairer Scotland Duty
assessments against new or revised policies and strategies as a means of mitigating
inequalities. 
100

Page 101

During 2021/2022, the Resource continued to work with the Corporate Equality and
Diversity Working Group to develop an integrated approach to Equality Impact
Assessment and the Fairer Scotland Duty.  The proposed new approach will also
consider human rights, children’s rights and climate change as part of policy
development processes.  It is anticipated that the new integrated impact assessment
will be implemented during 2022/2023.   
5. Key Areas of Progress 2021/2022
5.1. Key highlights in relation to mainstreaming equalities for Housing and Technical
Resources during 2021/2022 are detailed in Appendix 1 and include:- 
 the delivery of the Home+ affordable housing supply programme, with a focus
on accessibility
 progression of a number of initiatives supporting digital inclusion and
technology enabled care for housing customers
 a range of supports to vulnerable individuals and groups including those
experiencing homelessness, Gypsy/Travellers, refugees, older people and
those with disabilities
 national recognition of the Council’s engagement activity and collaborative
approach with Gypsy/Traveller residents with the Council winning awards from
both COSLA and the UK Municipal Journal
 the continued strong focus on partnership working to deliver homelessness
prevention and tenancy sustainment services
 the implementation of a person-centred housing pathway approach for people
experiencing domestic abuse and care experienced young people
 the continued implementation of the ‘Homes for Ukraine’ scheme and other
resettlement programmes, by providing accommodation and support to
refugees
 supporting the identification of appropriate accommodation for asylum seekers 
5.2. Full details of key areas of progress for the Resource during 2021/2022 can be found
at Appendix 1.   
6. Consultation, Engagement and Customer Feedback
6.1. As part of the Resource’s annual consultation programme and in addition to the
broader programme of engagement, officers continued to work closely with a range
of equalities groups and stakeholders including:- 
 Disability Partnership Housing Sub-Group 
 South Lanarkshire Access Panel 
 residents of the Council’s 2 gypsy/travellers’ sites
 Seniors Together
 sheltered housing tenants 
 people with lived experience of homelessness
 care-experienced young people
 South Lanarkshire Gender-based Violence Partnership
 South Lanarkshire Autism Strategy Group
 Financial Inclusion Network Digital Inclusion Sub-Group
 South Lanarkshire Youth Council 
 Bord-na-Gaidhlig 
101

Page 102

During 2021/2022, these groups and stakeholders were instrumental in contributing
to the development of key strategic pieces of work, including the review of the Anti-
Social Behaviour Policy and the annual rent setting scrutiny and engagement
programme. 
7. Complaints
7.1. There were no complaints recorded within the Equalities category during 2021/2022. 
8. Employee Learning and Development
8.1. Resource employees participated in a wide range of equality and diversity related e-
learning activities during 2021/2022.  This included a core set of mandatory training
modules for all employees which included:- 
 Equality and Diversity Awareness (completed by 749 employees)
 Unconscious Bias (completed by 473 employees)
 Marriage and Civil Partnership (completed by 463 employees)
 Race Discrimination (completed by 728 employees) 
This programme of equalities training will continue to be rolled out by Employee
Development on an ongoing basis.  Additionally, the Resource also delivered
training/awareness sessions on the following topics:- 
 British Sign Language training at an appropriate level for employees to support
customers with a hearing impairment
 in July 2021, guidance in relation to Equality Impact Assessment and the Fairer
Scotland Duty was delivered to appropriate housing staff as part of a service
development session.  This aimed to ensure that these processes continue to
be considered in all new or revised strategic pieces of work
 in December 2021, a service development session on the Housing and
Dementia Framework was delivered to all housing operational staff to raise
awareness of the Framework.  This included information and advice on the
Herbert Protocol, a tool which provides vital information to the police about
vulnerable people who may have gone missing 
9. Equality and Diversity Reporting Framework
9.1. On an annual basis, the Resource reports the range of work and activities being
progressed to support mainstreaming equality to the following key stakeholders:- 
 Housing and Technical Resources, Resource Management Team 
 Equal Opportunities Forum 
 Parent Joint Consultative Committee
 Housing and Technical Resources Committee 
10. Key Priorities for 2022/2023
10.1. The Resource Equality and Diversity Co-ordinating Group (EDCG) will continue to
oversee the work in relation to mainstreaming equality across Housing and Technical
Resources during 2022/2023. 
10.2. Key priorities for the Resource during 2022/2023 include:- 
 continue to implement Equality Impact and Fairer Scotland Duty assessments
to new and revised policies and strategies
 continuing to deliver a range of housing solutions to meet a wide variety of
needs
102

Page 103

 delivering Year 4 of the Rapid Rehousing Transition Plan
 continue to implement the adaptations programme to support independent living
for older people with disabilities
 continuing to support the refugee resettlement programmes, including the
‘Homes for Ukraine’ scheme and the provision of accommodation for asylum
seekers
 continue a programme of consultation and engagement with a range of equality
groups to help shape housing services and practice
 continue to provide a range of translation services to customers with specific
communication requirements, including sign language provision 
10.3. Full details of key priorities to be taken forward during 2022/2023 can be found at
Appendix 2. 
11. Next Steps
11.1. During 2022/2023, in line with the agreed reporting schedule, an annual update has
been reported to the groups/stakeholders detailed at 9.1 above. 
12. Employee Implications
12.1. There are no employee implications associated with this report. 
13. Financial Implications
13.1. There are no financial implications associated with this report. 
14. Climate Change, Sustainability and Environmental Implications
14.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
15. Other Implications
15.1. There is a risk to South Lanarkshire Council should the Resource not comply with
the relevant equalities’ duty and legislation. 
15.2. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement to the Scottish Housing Regulator. 
16. Equality Impact Assessment and Consultation Arrangements
16.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment or formal consultation is required.   
Stephen Gibson
Executive Director (Housing and Technical Resources) 
22 November 2022 
Link(s) to Council Values/Priorities/Objectives
 Focused on people and their needs
 Working with and respecting others 
 Accountable, effective, efficient and transparent 
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Good quality, suitable and sustainable places to live 
 Caring, connected, sustainable communities
103

Page 104

 People live the healthiest lives possible 
 Our children and young people thrive 
Previous References
 Mainstreaming Equality and Diversity within Housing and Technical Resources –
Annual Report to Housing and Technical Resources Committee (8 December 2021) 
List of Background Papers
 A New Deal for Tenants – Draft Strategy Consultation Paper (The Scottish
Government – December 2021) 
 Review of the Operation of the Public Sector Equality Duty in Scotland: Consultation
Paper (The Scottish Government – December 2021)
 South Lanarkshire Health and Social Care Partnership Strategic Commissioning Plan
2022 to 2025
 South Lanarkshire Council Equality Outcomes 2021-2025
 Fairer Scotland Duty Guidance for Public Bodies (The Scottish Government – October
2021)
 South Lanarkshire Rapid Rehousing Transition Plan 2019 to 2024 
Contact for further Information
If you would like to inspect the background papers or want further information, please
contact: 
Linda Pearson, Strategy Co-ordinator
Tel:  01698 454092
E-mail: linda.pearson@southlanarkshire.gov.uk 
104

Page 105

APPENDIX 1 
KEY AREAS OF PROGRESS 2021/22
Home+ Affordable Housing Supply Programme
During 2021/22, a total of 551 additional affordable homes for social rent were
delivered across South Lanarkshire. This included 362 additional homes delivered 
by the council and 189 new build homes built by Registered Social Landlords
(RSLs). In delivering the council’s new build housing programme, 23% of these properties 
were designed to meet the needs of those with particular needs, including wheelchair 
users. 
Adaptations Programme
During 2021/22, a total of 1,514 homes were adapted to support people with health
conditions or disabilities to continue to live independently within their own homes, without
the need for rehousing or moving to a care setting.  The Resource completed 993
adaptations to council properties and a further 521 adaptations were completed in private
homes through grant funding provided through the Scheme of Assistance.  
Housing and Homelessness
Through the Rapid Rehousing Transition Plan (RRTP), the Resource and its
housing and homelessness partners continue to take forward a range of actions to
prevent and reduce homelessness and limit the time people experiencing 
homelessness spend in temporary accommodation.   
The third annual review of the RRTP was undertaken during 2021/22 and was
reported to Housing and Technical Resources Committee on 10 August 2022. The
review noted that significant progress had been made in the third year of the plan. 
Key highlights included:- 
 a 21% reduction in the number of households who were homeless (969
households at 31 March 2021 reducing to 765 household at the end of March
2022);
 a significant reduction in long-term homelessness with 25% fewer homeless
households living in temporary accommodation for more than 12 months;
 the continued strong focus on partnership working to deliver homelessness
prevention and tenancy sustainment services; 
 the further development of Housing First, with a total of 33 households supported
through the programme; 
 the continuation of the positive Personal Housing Planning approach for
vulnerable groups including women experiencing domestic abuse, care
experienced young people and those leaving prison.
Technology Enabled Care Programme
During 2021/22, the Resource continued to progress a range of Technology 
Enabled Care (TEC) initiatives to support independent living for older people, those
with disabilities and other vulnerable customers.  Some examples of the work undertaken in
the year included:-   
 the delivery of 20 TEC enabled council homes at the Blantyre housing and care
development.
 176 digital devices with data supplied to vulnerable tenants and other customers
through successful bids to Connecting Scotland, the Lintel Trust and the ‘Bringing
IT Home’ project.  
 installation of wi-fi at both council-owned Gypsy/Traveller sites.
 utilising Turning Point Scotland’s out of hours crisis response service Digital
105

Page 106

Harm Reduction Toolkit with homelessness service users.   
 Truecall call blockers and video doorbells installed for sheltered tenants and
other vulnerable customers by Trading Standards.
 use of the NHS ‘Near Me’ video consulting service promoted across
homelessness and sheltered housing services to facilitate virtual face-to-face
medical appointments for service users.
 joint working with IT and Social Work Occupational Therapy services to test
telecare solutions for sheltered housing tenants. 
To augment the work that is ongoing around TEC, during 2021/22, the Resource
also completed sign-up to the Scottish Federation of Housing Association’s TEC in Housing
Charter.  This provides an opportunity to join a network of housing providers across
Scotland to share good practice and explore new innovations. 
Housing and Dementia
During 2021/22, the Resource commenced implementation of the Chartered Institute of
Housing’s Housing and Dementia Framework.  This aims to better support tenants who are
living with dementia to lead full and independent lives for as long as possible, within the
comfort of their own home.   
An initial self-assessment of the sheltered housing service was undertaken, and an action
plan has been developed to take forward a number of improvements.  This aims to ensure
that people living with dementia are provided with the right advice, the right home and the
right support.  
Refugee Resettlement
As at the end of March 2022, 56 families (202 individuals) had been settled across
South Lanarkshire, with over half being children under 16 years of age.  These families
have come to the UK through the Syrian Refugee Resettlement Programme and the
new UK Resettlement Programme and are supported by specialist Support Officers
from the Refugee Resettlement Team.  The Refugee Resettlement Team work 
closely with four Youth, Family and Community Learning Officers (ESOL), within 
Education Resources, enabling individuals to access opportunities, positively
engage and integrate with communities and develop English language skills.   
Following the Russian invasion of Ukraine on 24 February 2022, the UK 
Government announced a ‘Homes for Ukraine’ scheme to assist Ukrainian nationals
displaced by the war to apply for a visa to live in the UK.  The council and its 
partners have a pivotal role in helping to support Ukrainian nationals, by providing 
accommodation, conducting property and safeguarding checks, providing a range of 
practical support and assistance and managing health and wellbeing.  This work will
help support the implementation of the scheme and the associated Scottish Super 
Sponsor scheme during the year ahead.  The Resource has also been working to support
the identification of accommodation for asylum seekers.
Gypsy/Travellers
During 2021/22, the Resource continued to work closely with residents of its two 
Gypsy/Traveller sites to improve both accommodation and site provision.  A range
of improvement projects were progressed in line with site investment masterplans
previously co-developed with site residents.  These included: - 
 the installation of a new community facility and events space at Shawlands
Crescent, Larkhall, designed and managed by residents.
 the extension and reconfiguration of pitches across both sites to meet fire safety
guidance and provide residents with more space to allow larger accommodation
options. 
 a range of upgrades to the amenity units at both sites, including the installation of
106

Page 107

new decarbonised heating, insulation, doors, windows and roofs. 
 the installation of wi-fi at both sites to help residents overcome social isolation
and digital accessibility issues commonly observed within the Gypsy/Traveller
community.   
The Resource’s engagement activity and collaborative approach with 
Gypsy/Traveller residents recently received recognition at a national level, with the 
council winning awards from both COSLA and the UK Municipal Journal.
Equality Data Collection and Knowing our Customers
During 2021/22, the Resource provided an update to the Scottish Housing Regulator,
through the Annual Assurance Statement, confirming that plans were being developed to
review and adjust the existing approach to the collection of equalities and human rights
information to support new regulatory requirements. 
A Resource working group was established to consider actions to improve the
efficacy and level of equalities monitoring information held for customers.  An action
plan has been developed, prioritising key areas to be progressed in conjunction with
the development of the new Integrated Housing and Property Management System.
This work will be a key priority area for the Resource Equality and Diversity Co-
ordinating group during 2022/23 and will help ensure that the specific needs of 
customers are being met.  
Support to Victims of Domestic Abuse
During 2021/22, the Resource implemented a person-centred housing pathway approach
for people experiencing domestic abuse.  The pathway considers options to support victims
that can include agency support and safety planning to remain in their current
accommodation or provision of housing advice, should they wish to move to a different
location.   
A total of 19 housing pathways were completed for people experiencing domestic abuse
during 2021/22.  
Translation and Interpretation Services 
The Resource continues to provide a range of translation (written) and interpretation
(verbal) services to customers with specific communication requirements, including sign
language provision.  These services have helped to make housing services more inclusive
for people whose first language is not English.   
107

Page 108

APPENDIX 2 
KEY PRIORITIES FOR 2022/23
Equality Impact Assessment and the Fairer Scotland Duty
Continue to implement Equality Impact and Fairer Scotland Duty assessments to new and
revised policies and strategies, whilst contributing to development of the new integrated
approach.
Rapid Rehousing Transition Plan (RRTP) 
Continue to implement, monitor and report on progress in relation to the Equality Outcomes
for 2021-25, linking to the implementation of Year 4 of the RRTP. 
Equalities Data Collection and Monitoring
Take forward priority actions identified to improve equalities monitoring information held for
customers to help better understand and meet their needs. 
Home+ Affordable Housing Supply Programme 
Continue to implement the Home+ affordable housing supply programme, to support the
delivery of additional affordable homes that meet a variety of needs.  
Adaptations Programme
Continue to implement the adaptations programme to support independent living for older
people and those with disabilities. 
Technology Enabled Care
Continue to explore and deliver new innovations around Technology Enabled Care and
digital inclusion to support health and wellbeing for vulnerable customers.  
Refugee Resettlement Programme
Continue to contribute to the UK Refugee Resettlement Programme and support the
Homes for Ukraine and Scottish Super Sponsor Scheme. 
Asylum Dispersal
Take forward actions in support of the introduction of the UK Government’s system for
widening asylum dispersal.  
A New Deal for Tenants – Rented Sector Strategy
Consider implications and respond to requirements arising from the finalised Rented Sector
Strategy due to be published by the Scottish Government in late 2022 and related housing
legislation to be introduced in 2023. 
Housing and Dementia
Continue to implement the Housing and Dementia framework to support customers living
with dementia to maintain their independence for as long as possible.
Gypsy/Travellers
Continue to engage with Gypsy/Traveller site residents to inform and shape services and
the programme of investment which continues to be delivered at both sites.  
Translation and Interpretation 
Continue to make housing services more accessible for people whose first language is not
English by providing translation and interpretation services. 
Consultation and Engagement 
Continue a programme of consultation and engagement with a range of equality groups to
help shape housing services and practice.
Learning and Development
Continue to provide equalities-based learning and development opportunities for employees
and Elected Members to reflect current priorities. 
Public Sector Equality Duty 
Consider any implications for the Resource arising from the Scottish Government’s revised
Public Sector Equality Duty, when published. 
Gaelic Language Plan
Support the implementation of the council’s Gaelic Language Plan. 
108

Page 109

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Delegated Authority Report – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Committee on transactions processed by delegated authority by
Property Services during Quarter 2 of 2022/2023
[1purpose]
2. Recommendation(s)
2.1. The Housing and Technical Resources Committee is asked to approve the following
recommendation(s):- 
(1) that the transactions processed by delegated authority by Property Services
during Quarter 2 of 2022/2023, be noted 
3. Background
3.1. The Executive Director (Housing and Technical Resources) has delegated authority
to deal with various transactions, including:- 
 leases of a value up to £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
3.2. Delegated authority reports are prepared by case officers and submitted to the Head
of Property Services for approval, once provisional agreement has been reached
with the third party.  A weekly list of approved reports is published on the Council’s
intranet under “Estates Property Transactions”. 
3.3. The delegated reports provide authority for officers to progress transactions and
where appropriate, to instruct Legal Services.  The receipt of any monies arising
from the transactions occurs at a date in the future once missives have been
concluded and any suspensive conditions met.  It should be noted that some
transactions may never settle. 
4.  Summary Quarter 2 2022/2023
4.1. The summary of transactions progressed under delegated authority during Quarter 2
of 2022/2023 is shown in Appendix 1, however, can be summarised as follows:- 
Total number of transactions 60 
Total value of lease transactions £305,543 per annum 
Total value of capital transactions £1,594,065 
Total number of miscellaneous transactions £0
18
109

Page 110

5. Employee Implications
5.1. There are no employee implications associated with this report. 
6. Financial Implications
6.1. The rental income to the Council is increased as a result of the new lettings and
lease renewals. 
6.2. Disposals generate additional capital funds for the Council’s Capital Programme. 
6.3. Acquisitions are carried out in accordance with project plans and approved capital
budgets, to enable investment programmes to proceed. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no issues in relation to climate change, sustainability and environment
contained within this report. 
8. Other Implications
8.1. There is a low risk that the rental and capital receipts identified within these
delegated authority reports are not achieved if, for reasons outwith the Council’s
control, the tenant/purchaser chooses not to proceed with the transactions. 
However, Property Services has in place procedures and consultations intended to
minimise this risk. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Consultation takes place with the occupying Resource, Planning, Roads and Legal
Services on a transaction by transaction basis as and when required. 
9.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 10 August 2022
 Housing and Technical Resources Committee, 8 December 2021 
List of Background Papers
 Plans and drawings of the property involved in these transactions can be obtained from
the Assets and Estates Team, Property Services
 Weekly List of Delegated Authority Transactions can be obtained on the Council’s
intranet 
110

Page 111

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
111

Page 112

Appendix 1 
Delegated Authority Transactions 
Transaction Type  Quarter 2
2022/2023 
No  Value   
Lease Renewal 13 £102,650 
New Lease 
Landlords Consent
11 
2
£165,542 
£0   
Assignation 1 £0   
Rent Review 1 £37,351   
Total Revenue  28  £305,543   
Disposal 4 £15,400   
Compensation 0 £0   
Wayleave/Servitude 3 £1,075   
Acquisition 
Title Waiver
20 
0
£1,577,590 
£0   
Total Capital  27  £1,594,065   
Miscellaneous 5 £0 
112

Page 113

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 14 December 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Notification of Contracts Awarded - 1 July to 27
October 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee of contracts awarded by Housing and Technical
Resources for the supply of Goods, Services and Works, following formal
tendering in excess of £50,000 during the period 1 July to 27 October 2022
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r]
(1) that the details of the contracts awarded by Consultancy Services in Appendix
A, be noted;
(2) that the details of the contracts awarded by Procurement Team in Appendix
B, be noted; and
(3) that the details of the sub contracts awarded by Building Services in Appendix
C, be noted.
[1recs]
3. Background
3.1. It is a requirement of Clause 21.8 of the Standing Orders on contracts that details of
the acceptance of all tenders above £50,000, be reported retrospectively to the
relevant Committee for noting other than those under Clause 21.3 where the award
is not the lowest in a price only tender or costs exceed the approved financial
provision.  In these instances, a report is submitted to the appropriate Committee
and subsequent authority to award is granted by that Committee. 
4. Contracts Awarded
4.1. A full list of the contracts is provided in the appendices to this report. 
5. Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. Appropriate budgetary provision is available for each of the contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1 There are no climate change, sustainability or environmental implications in terms of
the information contained within this report. 
19
113

Page 114

8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is no requirement to undertake any consultation in relation to the content of
this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
22 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 10 August 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Derek Craig, Property Manager (Consultancy Services)
Ext:  845 3517 (Tel:  01698 453517)
E-mail:  Derek.Craig@southlanarkshire.gov.uk 
114

Page 115

Appendix A 
Contracts Awarded (Consultancy Services) 1 July – 27 October 2022 
Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Education EDD011120.004 Clyde Terrace Nursery SLC Building Services New Build Nursery £3,230,699.23 05/07/2022
Education EDD011888 Cathkin Nursery Expansion SLC Building Services Nursery Expansion £104,880.28 07/07/2022
Education EDD011859 Carnwath Nursery Expansion SLC Building Services Nursery Expansion £105,223.38 07/07/2022
Housing
General
Fund
HGF011901 Lanark Lifestyles Pool - Roof
Works Procladd (Small Works) Ltd Roof Works £97,147.58 01/08/2022
Housing HOD011742 Wyler Tower, Hamilton -
Emergency Lighting SLC Building Services Emergency Lighting £143,561.37 04/08/2022
Housing HOD011863 Strutherhill Zone B External
Fabric Repairs SLC Building Services External Fabric Repairs £1,736,881.43 07/08/2022
Housing
General
Fund
HGF011889 Lanark Business Unit Roof
Replacement Procladd (Small Works) Ltd Roof Replacement £90,928.05 09/08/2022
Community COM011639 Carnwath Roads Depot – Pre-
Demolition Works SLC Building Services Pre-Demolition Works £82,808.12 18/08/2022
115

Page 116

Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Education EDD011239 Castlefield PS Extension SLC Building Services Castlefield PS Extension £1,025,884.00 18/08/2022
Housing HOD011521.002 Hamilton Road, Larkhall SLC Building Services Aids & Adaptations (Extension) £112,275.82 29/09/2022
Housing
General
Fund
HGF011819 Replacement Roof to the Land
& Fleet Depot, Rutherglen SLC Building Services Roof Replacement £72,246.30 04/10/2022
Housing
General
Fund
HGF 011964 Calderglen Park Conservatory  Blantyre Park Services Ltd H&V Controls £60,000.00 14/10/2022
Housing HOD011876 Margaretvale Sheltered
Housing Complex SLC Building Services Internal Area Upgrade £130,418.63 24/10/2022
116

Page 117

Appendix B 
Contracts Awarded (Procurement Team) 1 July – 27 October 2022 
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/FINCOR/21/140 Provision of Independent Advice
and Support for Tenants in South
Lanarkshire
Tenants Information
Service
Provision of Independent Advice
and Support for tenants in South
Lanarkshire
£160,000.00 24/05/2022
SLC/PS/HTR/21/115 Close Lighting Upgrade, Cathkin GD Chalmers Ltd Close Lighting Upgrade, Cathkin £58,196.20 04/07/2022
SLC/PS/HTR/21/262 Provision of Manned Security
Services
Profile Security Services
Ltd
Provision of Manned Security
Services £3,250,000.00 05/07/2022
SLC/PS/HTR/21/278
Maintenance of Closed Protocol
Combined Heat Power (CHP)
Units
Sav United Kingdom Ltd
Maintenance of Closed Protocol
Combined Heat Power (CHP)
Units
£152,710.95 08/07/2022
SLC/HTR/16/353 Maintenance Of BEMS
Installations
Building Management
Solutions
Maintenance Of BEMS
Installations £117,113.20 29/07/2022
SLC/PS/HTR/21/231 Maintenance and Contracts
Term Scaffolding Contract Turner Access Ltd Maintenance and Contracts
Term Scaffolding Contract £2,352,665.04 05/09/2022
SLC/PS/HTR/22/089 SLC Phase 4 Demolition George Beattie & Sons Ltd SLC Phase 4 Demolition £1,275,000.00 04/10/2022
SLC/PS/HTR/22/244 Service and Maintenance of
Chiller Units at EK Ice Rink Star Refrigeration Ltd Service and Maintenance of
Chiller Units at EK Ice Rink £88,528.00 05/10/2022 
117

Page 118

Appendix C 
Contracts Awarded (Building Services) 1 July – 27 October 2022 
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
BSP011947.002 Clyde Terrace New Build
Nursery Fleming Buildings Ltd Sub-Contract: Timber Kit £276,967.00 14/07/2022
BSP011947.004 Clyde Terrace New Build
Nursery Blantyre Park Services Ltd Sub-Contract: Mechanical &
Plumbing £308,834.59 14/07/2022
BSP011947.001 Clyde Terrace New Build
Nursery Joseph Leckie & Sons Ltd Sub-Contact: Groundworks,
Brickworks & Piling £788,629.20 14/07/2022
BSP011947.003 Clyde Terrace New Build
Nursery Procladd (Scotland) Ltd Sub-Contract: Roof & Wall
Cladding £246, 789.91 14/07/2022
BSP011947.007 Clyde Terrace New Build
Nursery Scottech Ltd Sub-Contract: Curtain Walling £112,290.50 19/07/2022
BSP011947.008 Clyde Terrace New Build
Nursery Orona Ltd Sub-Contract: Lift £220,853.00 19/07/2022
BSP011973.001 Strutherhill Zone B  BCA Insulation Ltd Sub-Contract: Cavity Wall
Insulation £117,604.80 27/09/2022
118

Page 119

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
BSP011976.001 Castlefield PS Classroom
Extension Fleming Building Ltd Sub-Contract: Structural Timber
Kit £136,557.00 27/09/2022
BSP011976.006 Castlefield PS Classroom
Extension Scottech Limited Sub-Contract: Curtain Walling £84,400.10 30/09/2022
BSP011976.005 Castlefield PS Classroom
Extension Blantyre Park Services Ltd Sub-Contract: Mechanical £124,982.00 30/09/2022
BSP011973.002 Strutherhill Zone B  Ailsa Building Contractors
Ltd
Sub-Contract: Roughcast &
Rendering £342,401.22 30/09/2022
BSP011976.007 Castlefield PS Classroom
Extension Joseph Leckie & Sons Ltd Sub-Contract: Ground &
Brickworks £164,197.65 06/10/2022 
119

Page 120

120