Agenda Document Pack - Housing and Technical Resources Committee - 05/10/2022

South Lanarkshire Council · 5 October 2022
Back to Housing and Technical Resources Committee — 5 October 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 27 September 2022 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 05 October 2022
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Davie McLachlan (Chair), Martin Lennon (Depute Chair), Joe Fagan (ex officio), John
Bradley, Walter Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry
Convery, Margaret Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer,
Grant Ferguson, Alistair Fulton, Ross Gowland, Geri Gray, Lynsey Hamilton, Ross Lambie,
Richard Lockhart, Julia Marrs, Ian McAllan, Kenny McCreary, Norman Rae, David Shearer 
Substitutes
Robert Brown, Poppy Corbett, Gladys Ferguson-Miller, Martin Hose, Cal Johnston-
Dempsey, Gavin Keatt, Eileen Logan, Monique McAdams, Richard Nelson, Dr Ali Salamati,
Helen Toner, Margaret B Walker, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources Committee
held on 10 August 2022 submitted for approval as a correct record. (Copy
attached) 
5 - 14 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 31 August 2022 by the Executive Director (Finance and
Corporate Resources) and Interim Executive Director (Housing and Technical
Resources).  (Copy attached) 
15 - 20 
4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
- Housing Revenue Account (HRA)
Joint report dated 31 August 2022 by the Executive Director (Finance and
Corporate Resources) and Interim Executive Director (Housing and Technical
Resources).  (Copy attached) 
21 - 24 
5 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(excl Housing Revenue Account)
Joint report dated 14 September 2022 by the Executive Director (Finance and
Corporate Resources) and Interim Executive Director (Housing and Technical
Resources).  (Copy attached) 
25 - 28 
6 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account)
Joint report dated 6 July 2022 by the Executive Director (Finance and Corporate
Resources) and Interim Executive Director (Housing and Technical Resources). 
(Copy attached) 
29 - 32 
7 Housing and Technical Resources – Workforce Monitoring – June and July
2022
Joint report dated 6 September 2022 by the Executive Director (Finance and
Corporate Resources) and Interim Executive Director (Housing and Technical
Resources).  (Copy attached) 
33 - 40 
8 Housing and Technical Resources’ Resource Plan - Quarter 4 Progress
Report 2021-2022
Report dated 4 August 2022 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
41 - 70 
Item(s) for Decision 
9 Housing and Technical Resources Workforce Plan 2022 - 2025
Report dated 12 September 2022 by the Interim Executive Director (Housing
and Technical Resources).  (Copy attached) 
71 - 80 
10  Scottish Housing Regulator – Annual Assurance Statement 2021/2022
Report dated 22 August 2022 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
81 - 88
2

Page 3

11  South Lanarkshire Council's Strategic Housing Investment Plan 2023-2028
Report dated 20 September 2022 by the Interim Executive Director (Housing
and Technical Resources). (Copy attached) 
89 - 120 
12  Housing Services Customer Involvement Strategy 2018-2022 Annual
Review 2021/2022
Report dated 9 September 2022 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
121 - 142 
13  1 Kilmory Road, Carluke – Asset Transfer to Carluke Men’s Shed
Report dated 8 September 2022 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
143 - 148 
Item(s) for Noting 
14  Annual Report on the Charter (ARC) 2021/2022
Report dated 24 August 2022 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
149 - 154 
15  Housing and Technical Resource Plan 2022-2023
Report dated 9 September 2022 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
155 - 178 
Urgent Business 
16  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 10 August 2022 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Mathew Buchanan, Councillor Janine Calikes, Councillor Gerry
Convery, Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Allan Falconer, Councillor Grant Ferguson, Councillor Alistair
Fulton, Councillor Ross Gowland, Councillor Geri Gray, Councillor Lynsey Hamilton, Councillor
Ross Lambie, Councillor Martin Lennon (Depute), Councillor Richard Lockhart, Councillor Julia
Marrs, Councillor Ian McAllan, Councillor Kenny McCreary, Councillor Norman Rae, Councillor Dr
Ali Salamati (substitute for Councillor John Bradley), Councillor David Shearer 
Councillors' Apologies:
Councillor John Bradley, Councillor Archie Buchanan, Councillor Joe Fagan (ex officio) 
Attending:
Finance and Corporate Resources
H Calley, Administration Officer; J Davitt, Public Relations Officer; H Goodwin, Finance Manager
(Resources); E Maxwell, HR Business Manager; G McCann, Head of Administration and Legal
Services; L O’Hagan, Finance Manager (Strategy); S Somerville, Administration Manager; L Wyllie,
Administration Assistant
Housing and Technical Resources
D Lowe, Executive Director; A Finnan, Head of Housing Services; J Forbes, Head of Property
Services; C Mitchell, Strategy and Support Manager 
1 Declaration of Interests
No interests were declared. 
2 Revenue Budget Monitoring 2021/2022 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 28 June 2022 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April 2021 to 31 March 2022
for Housing and Technical Resources (excl HRA). 
An overspend position of £0.939 million was reported at 31 March 2022 which was mainly due to
additional expenditure in relation to the COVID-19 response, including temporary
accommodation costs for homeless people. 
The COVID-19 lockdown also had an impact on Property Services which provided the property
investment, repairs and maintenance service to the HRA and other Resources’ capital and
revenue budgets.  The Service continued to incur non-variable costs which required to be offset
by income recovery, therefore, a recharge had been made to those budgets to cover fixed costs.
2
5

Page 6

The main risk associated with the Council’s revenue budget was that there was an overspend. 
The risk had been assessed as low given the detailed budget management applied across the
Resources.  The risk would be managed through 4-weekly budget monitoring meetings at which
any variance would be analysed.  In addition, the probable outturn exercise ensured early
warning for corrective action to be taken, where appropriate. 
Virements were proposed to realign budgets and those movements were detailed in appendices
B, C and D of the report. 
The Committee decided: 
(1) that the overspend of £0.939 million as at 31 March 2022 on the Housing and Technical
Resources’ Revenue Budget (excl HRA), as detailed in Appendix A of the report, be noted;
and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 8 December 2021 (Paragraph 3) and Minutes of the Executive
Committee of 29 June 2022 (Paragraph 2)] 
3 Revenue Budget Monitoring 2021/2022 - Housing and Technical Resources -
Housing Revenue Account (HRA)
A joint report dated 29 June 2022 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April 2021 to 31 March 2022
for Housing and Technical Resources (HRA). 
As at 31 March 2022, there was a breakeven position against the phased budget. 
The COVID-19 lockdown had an impact on Property Services which provided the property
repairs and maintenance service to the HRA.  The Service continued to incur non-variable costs
which required to be offset by income recovery, therefore, a recharge would be required at year-
end to HRA revenue budget to cover a share of those fixed costs. 
The main risk associated with the Council’s revenue budget was that there was an overspend. 
The risk had been assessed as low given the detailed budget management applied across the
Resources.  The risk would be managed through 4-weekly Budget Monitoring meetings at which
any variance would be analysed.  In addition, the probable outturn exercise ensured early
warning for corrective action to be taken, where appropriate. 
Virements were proposed to realign budgets and those movements were detailed in Appendix A
of the report. 
The Committee decided: 
(1) that the breakeven position on the Housing and Technical Resources’ (HRA) revenue
budget, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 8 December 2021 (Paragraph 4) and Minutes of the Executive
Committee of 29 June 2022 (Paragraph 2)] 
6

Page 7

4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 6 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted advising of the actual expenditure
measured against the revenue budget for the period 1 April to 20 May 2022 for Housing and
Technical Resources (excl HRA). 
As at 20 May 2022, there was a breakeven position against the phased budget.   
Virements were proposed to realign budgets and those movements were detailed in appendices
B and C of the report. 
The Committee decided: 
(1) that the breakeven position as at 20 May 2022 on the Housing and Technical Resources’
(excl HRA) revenue budget, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of the Executive Committee of 29 June 2022 (Paragraph 2)] 
Councillor Colin Dewar entered the meeting during this item of business 
5 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources -
Housing Revenue Account (HRA) 
A joint report dated 6 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted advising of the actual expenditure
measured against the revenue budget for the period 1 April to 20 May 2022 for Housing and
Technical Resources (HRA). 
As at 20 May 2022, there was a breakeven position against the phased budget. 
The Committee decided: that the breakeven position on the Housing and Technical
Resources’ (HRA) revenue budget, as detailed in Appendix
A of the report, be noted. 
[Reference: Minutes of the Executive Committee of 29 June 2022 (Paragraph 2)] 
6 Capital Budget Monitoring 2021/2022 - Housing and Technical Resources (excl
Housing Revenue Account (HRA))
A joint report dated 20 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted advising of progress on the capital
programme for Housing and Technical Resources (excl HRA) for the period 1 April 2021 to 31
March 2022. 
At its meeting on 8 December 2021, this Committee noted that the budget for Housing and
Technical Resources for the financial year 2021/2022, including carry forward, was £8.146
million.  Since that meeting, the Executive Committee, at its meeting on 2 February 2022, had
also agreed the changes to the Housing and Technical Resources’ capital programme totalling a
net decrease of £1.345 million.  This took the Housing and Technical Resources’ programme for
2021/2022 to £6.801 million.
7

Page 8

The programme underspend of £1.317 million was mainly due to the timing of project spend on
a number of projects within multi-year programmes, as outlined in the report. 
Any underspend on those projects, along with the funding, would be carried forward into the
next financial year, as required.  An update on the 2022/2023 capital programme was detailed in
a separate report to the Committee. 
£0.036 million of capital spend would be required to be recorded as revenue spend.  This
transfer meant that, for the purpose of publishing the Council’s Annual Accounts only, there was
a capital spend of £5.448 million. 
The Committee decided: that the Housing and Technical Resources’ (excl HRA)
capital programme of £6.801 million, and expenditure for
the year of £5.484 million, be noted. 
[Reference: Minutes of 8 December 2021 (Paragraph 5) and Minutes of the Executive
Committee of 2 February 2022 (Paragraph 4)] 
7 Capital Budget Monitoring 2021/2022 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 7 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted advising of progress on the capital
programme for Housing and Technical Resources (HRA) for the period 1 April 2021 to 31 March
2022. 
The Housing capital programme for 2021/2022 totalled £79.640 million and was detailed, along
with the funding sources, in Appendix A of the report. 
The actual expenditure on the Housing programme was £73.181 million, a net underspend of
£6.459 million.  The delivery of the Housing capital programme for 2021/2022 had been affected
by the COVID-19 pandemic.  Part of that underspend related to the New Housing Supply
Programme and was due to the volume of buy backs, which had been lower than targeted
levels, due to the current market conditions.  The remainder of the underspend related to the
Council’s ongoing investment in stock, which had been affected by COVID-19 restrictions. 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £79.640 million and expenditure to
31 March 2022 of £73.181 million be noted. 
[Reference: Minutes of 8 December 2021 (Paragraph 6) and Minutes of the Executive
Committee of 29 June 2022 (Paragraph 5)] 
8 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources (excl
Housing Revenue Account (HRA))
A joint report dated 20 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted advising of progress on the capital
programme for Housing and Technical Resources (excl HRA) for the period 1 April to 20 May
2022. 
The budget of £8.125 million for Housing and Technical Resources was based on the overall
capital programme for 2022/2023, which had been approved by the Executive Committee on 29
June 2022.
8

Page 9

The financial position for Housing and Technical Resources was detailed in Appendix A of the
report. 
The total capital programme for Housing and Technical Resources was £8.125 million.  This
budget was based on the original programme of projects approved by the Council in February
2022, which had been updated to include budget carried forward from the financial year
2021/2022, as well as additional funding received and used to fund expenditure incurred in
2021/2022. 
As in previous years, it had been identified that, to comply with accounting rules, some project
expenditure would be reported through the revenue budget as it could not be classed as capital. 
£4 million had been transferred to Housing and Technical Resources’ revenue budget, along
with the relevant funding for the Private Housing Scheme of Assistance project (£1 million) and
£3 million of the Planned Asset Management budget.   
In relation to Planned Asset Management, the total overall budget across capital and revenue
remained at £4.800 million.  This would continue to be reviewed to ensure that it was classed
appropriately, as revenue or capital and any further movement reported to a future meeting. 
Those accounting adjustments were included in the programme of £8.125 million. 
The position for period 2 was anticipated spend to date of £0.061 million and spend to 20 May
2022 amounted to £0.061 million. 
The Committee decided: that the Housing and Technical Resources’ (excl HRA)
capital programme of £8.125 million and expenditure to
date of £0.061 million be noted. 
[Reference: Minutes of South Lanarkshire Council (Special) of 23 February 2022 (Paragraph 3)
and Minutes of the Executive Committee of 29 June 2022 (Paragraph 5)] 
9 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 6 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted advising of progress on the capital
programme for Housing and Technical Resources (HRA) for the period 1 April to 20 May 2022. 
The budget was based on the capital programme for the year, which had been presented to the
Executive Committee on 29 June 2022. 
The Housing capital programme for 2022/2023 totalled £52.230 million and was detailed, along
with the funding sources, at Appendix A to the report. 
Expenditure to 20 May 2022 was £3.289 million. 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £52.230 million and expenditure of
£3.289 million, be noted. 
[Reference: Minutes of the Executive Committee of 29 June 2022 (Paragraph 5)] 
10 Housing and Technical Resources – Workforce Monitoring – April and May 2022
A joint report dated 5 July 2022 by the Executive Directors (Finance and Corporate Resources)
and (Housing and Technical Resources) was submitted on the following employee information
for Housing and Technical Resources for April and May 2022:- 
9

Page 10

 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 12 March 2022 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 8 December 2021 (Paragraph 7)] 
11 Annual Review of the South Lanarkshire Rapid Rehousing Transition Plan
2021/2022
A report dated 29 June 2022 by the Executive Director (Housing and Technical Resources) was
submitted on the third annual review of the Rapid Rehousing Transition Plan (RRTP) 2019 to
2024. 
The RRTP, which aimed to significantly reduce homelessness and achieve rapid rehousing in
South Lanarkshire, was structured around 5 high level priority objectives.  There were 53
indicators against which the Council and its partners monitored progress, comprising 33 actions
and 20 measures.  In accordance with wider reporting arrangements across the Council, those
indicators were categorised into ‘blue’, ‘green’, ‘amber’ and ‘red’ depending on the progress
made against them. 
During 2021/2022, positive progress had been made.  Over 96% of the indicators were on or
only slightly behind target, to achieve the projected outcomes within the identified timescales. 
1 indicator was complete, 44 were progressing well and were on target, 7 showed minor
slippage and 1 was report later/contextual.  A summary of key highlights and achievements in
relation to each of the 5 priority objectives for 2021/2022 (Year 3) was detailed in the report. 
In addition to reviewing progress against the actions and measures set out within the RRTP
action plan, the annual review also provided the opportunity to examine the RRTP to ensure that
priority objectives, actions and measures remained appropriate, relevant and measurable.  As a
result, it was proposed that 1 amendment be made to the RRTP action plan.  The amendment
was detailed in the report and had been incorporated into the RRTP action plan for 2022/2023.   
The review of progress in Year 3 of the RRTP noted that, under very challenging circumstances,
significant positive indicators of success had been achieved.  The review also confirmed the
continuing commitment of partners to deliver RRTP priorities over the short-term as well as
securing the longer-term objectives of the Plan. 
Year 4 priorities would build on key learning points from the first 3 years of the plan and also on
the progress achieved by working in partnership to deliver services which were focused on
preventing homelessness and minimising the impact of homelessness where crisis could not be
avoided. 
A detailed summary of the key priorities to be progressed during Year 4 of the Plan (2022/2023)
was as follows:- 
♦ continue to deliver affordable homes for social rent
♦ ongoing focus on prevention of homelessness, particularly in relation to households with
children 
♦ continue to reduce long-term homelessness 
♦ sustain or increase the proportion of social housing lets directed to homeless households 
♦ further progress the homelessness Directions contained within the Strategic
Commissioning Plan
10

Page 11

♦ continue to maintain and develop links to the Local Child Poverty Action Report 
♦ monitor implementation of specific pathways for victims of domestic abuse and young care
leavers 
♦ continue to implement specific pathways for individuals released from prison 
♦ continue to focus on pathways and a Housing Options approach for young people 
♦ continue to expand the council’s HomeStart service for new tenants 
♦ continue to expand the Housing First approach 
♦ continue to convert temporary units to permanent accommodation 
The RRTP Annual Review 2021/2022, attached as Appendix 1 to the report, was submitted to
the Scottish Government by the required timescale of 30 June 2022. 
The outcomes from the RRTP Annual Review 2021/2022 would be submitted to the South
Lanarkshire Community Planning Partnership Board for noting on 14 September 2022. 
The RRTP confirmed the level of resources required to be directed towards the prevention and
alleviation of homelessness.  The Scottish Government had provided £2,184,717 in funding to
assist in the development and implementation of the RRTP which included £451,000 to support
the continued implementation of the RRTP in 2022/2023. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the progress made in delivering the RRTP objectives, as set out in the RRTP Annual
Review 2021/2022, attached as Appendix 1 to the report, be noted; 
(2) that the proposed revisions to the RRTP, detailed in section 5 of the report, be approved;
and 
(3) that the key priorities to be progressed in 2022/2023, detailed in section 7 of the report, be
noted. 
[Reference:  Minutes of 30 June 2021 (Paragraph 12)] 
12 Housing Allocation Policy – Medical Assessment
A joint report dated 15 July 2022 by the Executive Directors (Housing and Technical Resources)
and (Finance and Corporate Resources) was submitted requesting approval to increase the
Housing Services’ establishment. 
The revised Housing Allocation Policy had been approved by Housing and Technical Resources
Committee on 20 March 2019 and was introduced in May 2019.  The policy was subject to
ongoing monitoring to ensure that its aims were being met.  The policy included provision for
applicants’ medical circumstances to be assessed and considered within the assessment of their
housing needs.  The medical assessment service was currently carried out by an independent
medical adviser and provided an assessment of an applicant’s medical needs in relation to an
application for housing (including appeals) and homelessness applications. 
The service had been delivered through the current service provider for over 20 years and was
due to end in March 2023.  The provider had confirmed that it would not be in a position to
continue to provide the service after that point.  Whilst the contract had been routinely subject to
open procurement over the period, it had, however, attracted little or no interest from alternative
providers.
11

Page 12

On 8 December 2021, this Committee approved a minor change to the Allocation Policy to
support any required change in approach.  A revised approach had been identified and required
the addition of a Strategy and Policy Officer to the Housing Services’ establishment.  This Officer
would work with colleagues in the Health and Social Care Partnership to carry out the medical
assessment function. 
An appraisal of alternative approaches to the medical assessment function had been completed
by staff from Housing and Technical Resources and the South Lanarkshire Health and Social
Care Partnership (H&SCP). 
The exercise appraised that a joint approach by Housing and Health staff was the preferred
medical assessment service model.  Furthermore, it had been considered that the Health
Professional role would be best carried out by an Occupational Therapist.  This professional
would have the appropriate training and skills to assess whether an applicant’s current home
would be adapted or equipment provided, to make it suitable to their physical needs and were
also trained in assessing mental health and developmental needs. 
Work to develop the new approach was currently being progressed and it had been confirmed
that the Housing input to the service could not be delivered from within existing resources.  It
was, therefore, proposed to add 1 full-time equivalent (FTE) post of Strategy and Policy Officer
(Medical Assessment) on Grade 3, Level 2-4, SCP 63-74 (£33,651 to £39,162) to the Housing
and Technical Resources staffing establishment.  This post would have the specific
responsibility for medical assessments and supporting wider joint working with the Health and
Social Care Partnership. 
A plan had been developed detailing the key actions required to ensure the implementation of
the new medical assessment service model by the end of March 2023.  This would include
arrangements for the recruitment and management of the Housing and Health professionals,
where appropriate. 
It was proposed that the current service would continue to operate alongside the new service for
the first 3 months to enable a seamless transition and ensure the new model was delivered on
anticipated outcomes. 
The costs of establishing the new post would, in part, be offset against the annual cost of the
existing service which amounted to £16,866 in 2021/2022.  The remaining amount of £34,652
would be met from within existing Housing Revenue Account budget. 
The Committee decided: that 1 full-time equivalent (FTE) post of Strategy and Policy
Officer (Medical Assessment) on Grade 3, Level 2-4, SCP
63-74 (£33,651 to £39,162) be added to the Housing and
Technical Resources staffing establishment. 
[Reference:  Minutes of 8 December 2021 (Paragraph 8)] 
13 Disposal of Vacant Domestic Dwelling House at 1 Newhousemill Cottages,
Newhousemill Road, East Kilbride
A report dated 7 July 2022 by the Executive Director (Housing and Technical Resources) was
submitted requesting approval to declare the vacant dwelling house at 1 Newhousemill
Cottages, Newhousemill Road, East Kilbride surplus to the operational requirements of Housing
Services and progress its disposal. 
The property had been acquired by East Kilbride District Council from East Kilbride
Development Corporation in December 1995 and transferred to South Lanarkshire Council at
Local Government Re-organisation.  It comprised a 1 bedroom, end terraced, non-traditional,
sandstone cottage which was unique in terms of the Council’s current residential property
portfolio in the East Kilbride area.
12

Page 13

The property’s construction type differed from the remainder of the housing stock and was
adjoined to similar, terraced, sandstone cottages that were now wholly, privately owned. 
The property had been upgraded, in part, through the Housing Investment Programme,
however, now required significant investment if it was to meet Scottish Housing Quality
Standards.  The previous tenancy had ended and the property was currently vacant.  Disposal
of the asset was considered to be the preferred solution in terms of property management. 
It was recommended that the property be declared surplus and the Asset and Estates Section
be instructed to market the property for sale on the open market. 
Disposal of the property would generate a capital receipt which would contribute to the Housing
Account’s capital investment programme.  A Home Report would be required prior to marketing
and it was anticipated that the property would generate a high level of interest.  Disposal of this
property would reduce the Council’s liability in terms of management, investment and
maintenance. 
The Committee decided: 
(1) that the vacant property at 1 Newhousemill Cottages, Newhousemill Road, East Kilbride
be declared surplus to the operational requirements of Housing Services; 
(2) that the Executive Director (Housing and Technical Resources) be authorised to deal with
the disposal of the property from the Housing Account through the Council’s normal
surplus property procedure; and 
(3) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters in
respect of any subsequent disposal and enter into the necessary legal agreements on
terms which were in the best interests of the Council. 
14 Notification of Contracts Awarded - 1 November 2021 to 30 June 2022
A report dated 8 July 2022 by the Executive Director (Housing and Technical Resources) was
submitted on contracts awarded by Housing and Technical Resources, valued in excess of
£50,000, in the period 1 November 2021 to 30 June 2022, as follows:- 
 contracts awarded by Consultancy Services
 contracts awarded by Procurement Team
 contracts awarded by Building Services 
Details of the contracts and projects were provided in the appendices to the report. 
The Committee decided: 
(1) that the contracts awarded by Consultancy Services, as detailed in Appendix A to the
report, be noted; 
(2) that the contracts awarded by the Procurement Team, as detailed in Appendix B to the
report, be noted; and 
(3) that the sub-contracts awarded by Building Services, as detailed in Appendix C to the
report, be noted. 
[Reference:  Minutes of 8 December 2021 (Paragraph 18)] 
13

Page 14

15 Delegated Authority Report – Update
A report dated 4 July 2022 by the Executive Director (Housing and Technical Resources) was
submitted on transactions processed by Property Services during Quarters 3 and 4 of
2021/2022, together with a summary for 2021/2022 and Quarter 1 of 2022/2023. 
The Executive Director (Housing and Technical Resources), under delegated powers, had
authority to deal with various transactions including:- 
 leases up to the value of £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £100,000 
Details of the transactions undertaken during Quarters 3 and 4, as contained in Appendix 1 of
the report, were as follows:- 
Quarter 3 2021/2022:
Number of transactions 56
Total value of lease transactions £61,287 per annum
Total value of capital transactions £1,292,703
Total value of miscellaneous transactions £55,001   
Quarter 4 2021/2022:
Number of transactions 40
Total value of lease transactions £97,127 per annum
Total value of capital transactions £486,150
Total value of miscellaneous transactions £106,650 
Annual Summary 2021/2022:
Number of transactions 180
Total value of lease transactions £599,293 per annum
Total value of capital transactions £3,587,402
Total value of miscellaneous transactions £476,651  
Quarter 1 2022/2023:
Number of transactions 65
Total value of lease transactions £114,400 per annum
Total value of capital transactions £1,083,352
Total value of miscellaneous transactions £55,500 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 8 December 2021 (Paragraph 17)] 
16 Urgent Business
There were no items of urgent business.
14

Page 15

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Executive Director (Finance and Corporate Resources)
Interim Executive Director (Housing and Technical
Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 12 August 2022 for Housing and Technical
Resources (excl HRA)
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position as at 12 August 2022 on Housing and Technical
Resources (excl HRA) Revenue Budget, as detailed in Appendix A of the
report, be noted.
[1recs]
3. Background
3.1. This is the second revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) in Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 12 August 2022, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed. In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate.
3
15

Page 16

6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
we have mitigated through providing additional funds in future years budget strategy,
and in this year, through some reserve funds available. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
31 August 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Housing and Technical Resources  Committee, 10 August 2022 
List of Background Papers
 Financial ledger and budget monitoring results to 12 August 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Hazel Goodwin, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Hazel.Goodwin@southlanarkshire.gov.uk
16

Page 17

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 12 August 2022 (No.5) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
12/08/22
Actual
12/08/22
Variance
12/08/22 
%
Variance
12/08/22 Notes            
Budget Category            
Employee Costs 44,426  44,426  0  15,056  14,983  73  under 0.5% 
Property Costs 19,912  19,912  0  7,898  7,991  (93) over (1.2%) 
Supplies & Services 14,191  14,191  0  5,223  3,780  1,443  under 27.6% 
Transport & Plant 4,677  4,677  0  1,312  1,272  40  under 3.0% 
Administration Costs 3,746  3,746  0  1,341  1,349  (8) over (0.6%) 
Payments to Other Bodies 8,207  8,207  0  2,581  2,566  15  under 0.6% 
Payments to Contractors 18,756  18,756  0  6,675  6,692  (17) over (0.3%) 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  154  0  25  16  9  under 36.0% 
Total Controllable Exp. 114,069  114,069  0  40,111  38,649  1,462  under 3.6% 
Total Controllable Inc. (96,727) (96,727) 0  (32,854) (31,392) (1,462) under
recovered (4.4%) 
Net Controllable Exp. 17,342  17,342  0  7,257  7,257  0  - 0.0% 
Transfer to Reserves as
at (12/08/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (12/08/22) 17,342  17,342  0  7,257  7,257  0  - 0.0% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate.
17

Page 18

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 12 August 2022 (No.5) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
12/08/22
Actual
12/08/22
Variance
12/08/22 
%
Variance
12/08/22 Notes            
Budget Category            
Employee Costs 2,882  2,882  0  882  892  (10) over (1.1%) 
Property Costs 5,779  5,779  0  2,699  2,704  (5) over (0.2%) 
Supplies & Services 130  130  0  50  42  8  under 16.0% 
Transport & Plant 129  129  0  36  38  (2) over (5.6%) 
Administration Costs 147  147  0  47  47  0  - 0.0% 
Payments to Other Bodies 4,221  4,221  0  1,458  1,442  16  under 1.1% 
Payments to Contractors 2,750  2,750  0  711  711  0  - 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  11  0  5  2  3  under 60.0% 
Total Controllable Exp. 16,049  16,049  0  5,888  5,878  10  under 0.2% 
Total Controllable Inc. (7,568) (7,568) 0  (2,256) (2,258) 2  over
recovered 0.1% 
Net Controllable Exp. 8,481  8,481  0  3,632  3,620  12  under (0.3%) 
Transfer to Reserves as
at (12/08/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (12/08/22) 8,481  8,481  0  3,632  3,620  12  under (0.3%) 
Variance Explanations 
None. 
Budget Virements 
None. 
18

Page 19

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 12 August 2022 (No.5)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
12/08/22
Actual
12/08/22
Variance
12/08/22 
%
Variance
12/08/22 Notes            
Budget Category            
Employee Costs 41,544  41,544  0  14,174  14,091  83  under 0.6% 1
Property Costs 14,133  14,133  0  5,199  5,287  (88) over (1.7%) a
Supplies & Services 14,061  14,061  0  5,173  3,738  1,435  under 27.7% 2
Transport & Plant 4,548  4,548  0  1,276  1,234  42  under 3.3% 3, b
Administration Costs 3,599  3,599  0  1,294  1,302  (8) over (0.6%) 
Payments to Other Bodies 3,986  3,986  0  1,123  1,124  (1) over (0.1%) 
Payments to Contractors 16,006  16,006  0  5,964  5,981  (17) over (0.3%) 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143  143  0  20  14  6  under 30.0% 
Total Controllable Exp. 98,020  98,020  0  34,223  32,771  1,452  under 4.2% 
Total Controllable Inc. (89,159) (89,159) 0  (30,598) (29,134) (1,464) under
recovered (4.8%) 4
Net Controllable Exp. 8,861  8,861  0  3,625  3,637  (12) over 0.3% 
Transfer to Reserves as
at (20/05/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (20/05/22) 8,861  8,861  0  3,625  3,637  (12) over 0.3% 
Variance Explanations 
1. The variance in Employee Costs relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are
determined.
2. The level of expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue
works.
3. The use of plant and equipment varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
4. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
19

Page 20

20

Page 21

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Executive Director (Finance and Corporate Resources)
Interim Executive Director (Housing and Technical
Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources - Housing Revenue Account
(HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 12 August 2022 for Housing and Technical
Resources (HRA)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report be noted.
1recs]
3. Background
3.1. This is the second revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 12 August 2022, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed. In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
these pressures are assessed and managed within the budget planning exercise for
current and future years. 
4
21

Page 22

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
31 August 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 21 September 2022. 
List of Background Papers
 Financial ledger and budget monitoring results to 12 August 2022. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Hazel Goodwin, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Hazel.Goodwin@southlanarkshire.gov.uk
22

Page 23

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 12 August 2022 (No.5) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
12/08/22
Actual
12/08/22
Variance
12/08/22 
%
Variance
12/08/22 Notes            
Budget Category            
Employee Costs 13,914  13,914  0  4,727  4,678  49  under 1.0% 1
Property Costs 46,906  46,906  0  19,728  19,718  10  under 0.1% 
Supplies & Services 609  609  0  139  137  2  under 1.4% 
Transport & Plant 195  195  0  58  32  26  under 44.8% 
Administration Costs 5,644  5,644  0  1,373  1,376  (3) over (0.2%) 
Payments to Other Bodies 3,030  3,030  0  752  752  0  - 0.0% 
Payments to Contractors 100  100  0  40  49  (9) over (22.5%) 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 26,050  26,050  0  16,160  16,146  14  under 0.1% 
Total Controllable Exp. 96,448  96,448  0  42,977  42,888  89  under 0.2% 
Total Controllable Inc. (112,000) (112,000) 0  (37,203) (37,208) 5  over
recovered 0.0% 
Transfer to/(from) Balance
Sheet (2,773) (2,773) 0  (1,155) (1,061) (94) under
recovered (8.1%) 2
Net Controllable Exp. (18,325) (18,325) 0  4,619  4,619  0  - 0.0% 
Loan Charges 18,325  18,325  0  0  0  0  -   
Net Controllable Exp. 0  0  0  4,619  4,619  0  - 0.0% 
Variance Explanations 
1. The variance is due to higher than anticipated staff turnover
2. The net combined underspend to date allows for a lower than budgeted transfer from reserves. 
Virements 
None 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Executive Director (Finance and Corporate Resources)
Interim Executive Director (Housing and Technical
Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (excl Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl HRA) for the period 1 April 2022 to 12 August 2022
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the Housing and Technical Resources (excl HRA) capital programme of  
£8.486 million, and expenditure to date of £0.466 million, be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023. Further reports will follow
throughout the year. 
3.2. As noted in the last report to this Committee (10 August 2022), the budget for
Housing and Technical Resources for financial year 2022/2023 was £8.125 million.   
3.3. Since that meeting, the Executive Committee (24 August and 21 September 2022)
has also agreed changes to the Housing and Technical Resources Capital
Programme totalling a net increase of £0.361 million.  The details are shown in
Appendix A.  This takes the Housing and Technical Resources programme for
2022/2023 to £8.486 million.   
3.4. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As detailed in Section 3.3, the revised capital programme for Housing and Technical
Resources for 2022/23 is £8.486 million.   
5
25

Page 26

5.2. Period 5 Position 
Anticipated spend to date was £0.544 million and spend to 12 August 2022 amounts
to £0.466 million, an underspend of £0.078 million.  This mainly reflects the timing of
spend on the multi-year and multi project Prioritised Urgent Investment programmes.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The Council continues to experience material shortages, longer lead
times and extraordinary inflationary price increases and it is anticipated that this will
continue to impact the supply chain for the foreseeable future.  The impact of this will
continue to be monitored through the four weekly investment management
meetings.  Further updates will be reported in the coming months with any significant
increases in contract values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
14 September 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 10 August 2022
 Executive Committee, 24 August 2022
 Executive Committee, 21 September 2022 
List of Background Papers
 Financial ledger to 12 August 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
26

Page 27

Appendix A 
South Lanarkshire Council
Capital Expenditure 2022-2023
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2022 – 12 August 2022 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000
Office Accommodation 7,758 188 0 7,946  539 463
Other Housing 367 173 0 540  5 3
TOTAL 8,125 361 0 8,486  544 466 
For Information Only  
Budget Adjustments approved by Executive Committee, 24 August
2022: 
Budget Adjustments approved by Executive Committee, 21
September 2022: 
Budget Adjustments 
Prioritised Urgent Investment - Roberton Hall
Total Budget Adjustments             
£0.188m
£0.188m
Budget Adjustments 
Central Energy Efficiency Fund
Total Budget Adjustments             
£0.173m
£0.173m 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Executive Director (Finance and Corporate Resources)
Interim Executive Director (Housing and Technical
Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April 2022 to 12 August 2022
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources (HRA) capital programme
of £66.361 million, and expenditure of £16.150 million be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023. 
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 24 August 2022. 
3.3. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2022/2023 totals £66.361 million and is detailed
along with the funding sources at Appendix A to this report. Actual expenditure to 12
August is £16.150 million. 
5.2. The Resource is expecting to spend to this level, work will continue in the coming
months to monitor achievable spend. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
6
29

Page 30

7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
7.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact on the supply chain for the foreseeable future.  The impact will continue to be
monitored through the four weekly investment management meetings.  Further
updates will be reported in the coming months with any significant increases in
contract values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
6 July 2022 
Link(s) to Council Values/Priorities/Outcomes
♦ Accountable, Effective, Efficient and Transparent 
Previous References
♦ Executive Committee, 24 August 2022 
List of Background Papers
♦ Financial ledger to 12 August 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  hazel.goodwin@southlanarkshire.gov.uk
30

Page 31

South Lanarkshire Council       Appendix A
Housing Capital Programme 2022/23
As at 12 August 2022 
£m £m
Anticipated Capital Expenditure 2022/23   66.361
Estimated Financing Position 2022/23   
Capital Receipts  7.311  
Capital Financed From Current Revenue 26.050  
Prudential Borrowing 26.462  
Specific Grant – Scottish Government New Council Houses 4.048  
Specific Grant – Scottish Government Buy Backs 2.370  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
66.361 
Actual Expenditure to 12 August 2022  16.150 
Actual Financing Position to 12 August 2022   
Capital Receipts  0.007  
Capital Financed From Current Revenue 16.143  
Prudential Borrowing 0.000  
Specific Grant – Scottish Government New Council Houses 0.000  
Specific Grant – Scottish Government Buy Backs 0.000  
Specific Grant – Scottish Government Mortgage to Rent 0.000  
Other Income 0.000        
16.150 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – June and July 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for June and July 2022 relating to Housing and
Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for June and July 2022 relating to
Housing and Technical Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 11 June 2022 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for June to July 2022. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of July 2022 for Housing
and Technical Resources. 
The Resource absence figure for July 2022 was 6.9%, this figure has increased by
0.5% when compared to last month and is 2.3% higher than the Council-wide figure. 
Compared to July 2021, the Resource absence figure has increased by 2.2%. 
Based on the absence figures at July 2022 and annual trends, the projected annual
average absence for the Resource for 2022/2023 is 7.0% compared to a Council-
wide average figure of 6.1%. 
7
33

Page 34

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
The attendance information contained in this report includes absences as a result of
COVID-19, and employees are being supported through this difficult time to maintain
attendance levels where they can.  At the time of this report, the Council overall
absence level was 4.8% with 0.50% of this relating to Covid-19 for sickness and
special leave. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall 115 referrals were made this period.  This represents an
increase of 18 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 8 accidents/incidents recorded within the Resource this period, no
change when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, no disciplinary hearings were held within the Resource, this
represents a decrease of 3 when compared to the same period last year.  During this
period no appeals were heard by the Appeals Panel.  No grievances were raised
within the Resource, this figure remains unchanged when compared to the same
period last year.  No Dignity at Work complaints were raised within the Resource,
this figure remains unchanged when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 11 leavers in the Resource this period eligible for an exit
interview. This figure has increased by 1 when compared with the same period last
year.  Four exit interviews were conducted in this period an increase of 4 when
compared to the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period June to July 2022, 21 (17.18 FTE)
employees in total left employment, managers indicated that 21 (17.18 FTE)
employees will be replaced. 
5. Staffing Watch 
5.1. There has been an increase of 3 in the number of employees in post from 11 June
2022 to 12 March 2022. 
34

Page 35

6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
6 September 2022 
Link(s) to Council Values/Priorities/Outcomes
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
35

Page 36

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
April 4.1 3.2 5.5 April 3.5 3.6 10.6 April 3.8 3.3 7.6 April 4.4 4.3 5.6
May 2.8 2.9 4.5 May 2.0 4.2 8.1 May 2.5 3.4 6.0 May 3.1 4.9 5.4
June 3.2 3.5 4.9 June 2.0 6.2 8.5 June 2.7 4.6 6.4 June 2.7 4.7 5.3
July 2.7 4.0 5.5 July 2.7 5.7 8.9 July 2.7 4.7 6.9 July 2.3 4.0 4.6
August 2.5 4.9 August 3.4 7.9 August 2.8 6.2 August 3.1 4.7
September 2.1 5.8 September 3.3 8.1 September 2.6 6.8 September 4.2 6.4
October 2.9 5.2 October 3.9 9.0 October 3.3 6.8 October 4.8 6.3
November 3.7 5.7 November 5.6 9.2 November 4.5 7.2 November 5.8 6.9
December 3.3 4.6 December 4.8 9.5 December 3.9 6.7 December 5.6 6.9
January 3.5 5.2 January 4.4 8.8 January 3.9 6.7 January 4.8 7.0
February 3.2 6.4 February 4.7 8.5 February 3.8 7.3 February 4.8 6.6
March 3.1 7.8 March 4.5 10.7 March 3.6 9.0 March 4.9 7.9
Annual Average 3.1 4.9 5.5 Annual Average 3.7 7.6 9.0 Annual Average 3.3 6.1 7.0 Annual Average 4.2 5.9 6.1
Average Apr-Jul 3.2 3.4 5.1 Average Apr-Jul 2.6 4.9 9.0 Average Apr-Jul 2.9 4.0 6.7 Average Apr-Jul 3.1 4.5 5.2
866 579 1445 16062
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
APT&C Manual Workers Council Wide
No of Employees at 31 Jul 2022No of Employees at 31 Jul 2022 No of Employees at 31 Jul 2022 No of Employees at 31 Jul 2022
36

Page 37

HOUSING AND TECHNICAL RESOURCES
Jun-Jul Jun-Jul
2021 2022
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 24 20
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 97 115
Jun-Jul Jun-Jul
2021 2022
Specified Injuries* 0 0
Over 7 day absences 1 5
Over 3 day absences** 0 0
Minor 6 2
Near Miss 0 0
Violent Incident:  Physical**** 0 0
Violent Incident:  Verbal***** 1 1
Total Accidents/Incidents 8 8
Jun-Jul Jun-Jul
2021 2022
Total Number of Hearings 3 0
Total Number of Appeals 0 0
Appeals Pending 0 0
Time Taken to Convene Hearing Jun - Jul 2022
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 0 0
Jun-Jul Jun-Jul
2021 2022
Number of Grievances 0 0
Number Resolved at Stage 1 0 0
Number Resolved at Stage 2 0 0
Number Resolved at Stage 3 0 0
Still in Progress 0 0
Jun-Jul Jun-Jul
2021 2022
Number of Incidents 0 0
Number Resolved at Informal Stage 0 0
Number Resolved at Formal Stage 0 0
Number of Appeals 0 0
Appeals in Process 0 0
Still in Process 0 0
Jun-Jul Jun-Jul
2021 2022
Number of Exit Interviews conducted 0 4
Total Number of Leavers Eligible for Exit Interview 10 11
Percentage of interviews conducted 0% 36%
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
23
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide
the "Total Specified" figures.
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
44
APPENDIX 2
45 41
5 10
37

Page 38

FTE* H/C** FTE H/C
Number of Leavers 17.18 21 35.54 45.00
Replace Employee 17.18 21 34.54 44.00
Leave vacant pening savings review 0.00 0 1.00 1.00
Plan to remove for savings 0.00 0 0.00 0.00
Filling on a Temp Basis 0.00 0 0.00 0.00
Plan to transfer budger to another post 0.00 0 0.00 0.00
End of fixed term post 0.00 0 0.00 0.00
* Full time equivalent
** Head count/number of employees
Jun - Jul 2022 Cumulative total
(Apr 22 - Mar 23)
Appendix 2a
38

Page 39

As at 11 June 2022
Total Number of Employees
F/T P/T F/T P/T
829 24 320 126
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 214.12 622.86 358.48 33.60 9.00 2.00 0.00 0.00 1241.06
As at 12 March 2022
Total Number of Employees
F/T P/T F/T P/T
831 23 314 128
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 209.82 628.46 356.31 33.20 9.00 2.00 0.00 0.00 1239.79
MALE FEMALE TOTAL
TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
Salary Bands
Appendix 3
JOINT STAFFING WATCH RETURN
HOUSING & TECHNICAL RESOURCES
1299
1296
*Full - Time Equivalent No of Employees
MALE FEMALE
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources’ Resource Plan:
Quarter 4 Progress Report 2021-2022 
1. Purpose of Report
1.1. The purpose of the report is to:- 
♦ provide the Housing and Technical Resources Resource Plan Quarter 4
Progress Report 2021-2022, for the period 1 April 2021 to 31 March 2022 
2. Recommendations
2.1. The Committee is asked to approve the following recommendations: 
(1) that the Housing and Technical Resources Resource Plan Quarter 4 Progress
Report 2021-2022 as summarised in paragraph 5.2. and attached as
Appendix 2 of this report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3. of this report, be noted; 
(3) that the areas for improvement and associated management actions as
detailed in paragraph 5.4. of this report, be noted; and
(4) that the additional scrutiny of changes in measure status between Quarter 2
and Quarter 4 as summarised at paragraph 5.5 and detailed at Appendix 3 of
this report, be noted. 
3. Background
3.1. The Housing and Technical Resources Resource Plan 2021-2022 was approved by
the Executive Committee on 28 April 2021 setting out the outcomes, measures and
actions to be managed and delivered by the Resource for the financial year 2021-
2022.   
3.2. The Resource Plan follows the agreed corporate structure and style. The Plan is a
key element of the council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Priorities set out in the Council Plan
Connect 2017-2022. 
3.3. Despite the easing of social distancing and other restrictions, the Council continues
to face financial and other impacts resulting from Covid. At times during the
pandemic a number of services had to be suspended or reduced due to government
advice, and the council was also obliged to redirect resources so that it could deliver
vital new services and supports for individuals, communities and businesses. There
was an inevitable impact on performance in some areas, with some effects ongoing. 
8
41

Page 42

4. Resource Objectives 2021-2022
4.1. The Resource established a number of outcomes to support the delivery of the
Connect Priorities in 2021-2022. These are detailed at Appendix 1. 
5. Quarter 4 Progress Report 2021-2022
5.1. Progress against all Resource Plan measures is contained in the Quarter 4 Progress
Report 2021-2022, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format, with the following definition, to give a status report on each measure:  
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report. To ensure adequate scrutiny of performance across all Resources, the
Council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or
‘amber’ measures at a future meeting. 
The overall summary of progress to date is as follows and performance should be
considered in the context of the impact of responding to COVID-19:
Status Measures
Statistical  Project  Total %
Blue  6 6 9%
Green  23 22 45 68%
Amber  5 3 8 12%
Red     2 1 3 4%
Report later/Contextual 5 0 5 7%
Totals  35 32 67 100%
(Data correct as at 08 September 2022) 
5.3. Key achievements for 2021-2022, to date, are noted below: 
5.3.1. 
Connect Priority  Ensure communities are safe, strong and sustainable 
Resource
Objective
Achievement
Improve the
availability, quality
and access of
housing
99.6% of homeless and potentially homeless decision
notifications issued with 28 days of date of initial
presentation achieved against a target of 98%.
93.4% of new tenancies sustained for more than a year
against target of 88%.
The average time to relet empty homes was 21.5 days
achieved against target of 26 days. 
Emergency repairs were, on average, completed in 4 hours
24 minutes against a target of 24 hours.
42

Page 43

Non-emergency repairs were, on average, completed in
11.76 days against a target of 28 days
99% of reactive repairs were completed right first time.
25% reduction in long-term homelessness (cases where
people have been homeless for more than 12 months) 
A 21% reduction in the level of active homeless cases from
969 in 2020/21 to 765 in 2021/22 
A 19% reduction in the length of time homeless households
spent in temporary accommodation from 223 days in
2020/21 to 181 days in 2021/22
Delivery of 537 new build properties and 53 Open Market
Purchase properties acquired. 
Work with
communities and
partners to
promote high
quality, thriving
and sustainable
communities
The annual review of the South Lanarkshire Local Housing
Strategy was approved by Executive Committee November
2021, and highlighted good progress against the indicators
within the strategy including performance within new supply,
homelessness and energy efficiency. 
Connect Priority  Get it right for children and young people 
Resource
Objective
Achievement
Contribute to the
Council’s objective
to protect
vulnerable
children, young
people and adults
In line with the Council's Housing Allocation Policy, housing
continues to be allocated to those most in need.  The
Council and its Registered Social Landlord partners
delivered an increase in the percentage of social rented
properties directed to homeless households in the year
(53.4% of all council homes and 33% of Registered Social
Landlord homes) reducing time spent in temporary
accommodation and minimising the impact on households
with children. 
Progress against this measure is reported annually
within the South Lanarkshire Local Child Poverty Action
Report. 
Connect Priority:  Improve health, care and wellbeing 
Resource
Objective
Achievement
Improve services
for older people
All demand has been met for adaptations to council housing.
There is no waiting list for adaptations to council housing.
Throughout 2021/22, a total of 94 amenity/wheelchair
additional housing units were provided across development
sites within South Lanarkshire. 
5.3.2. In addition to working towards these Priorities, we recognise that the Council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
43

Page 44

Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and achieving Best Value
Resource
Objective
Achievement 
Maintain current
high levels of
income collection
and generation
98.3% of rent collected against rent due against the target of
96.3% 
Continue to
effectively manage
customer
complaints
An average of 5 working days for a full response to be
issued at Stage 1, against a target timescale of 5 working
days (SSHC)
An average of 15 working days for a full response to be
issued at Stage 2, against a target timescale of 20 working
days (SSHC) 
5.4. Areas for improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why, and the
management action now being taken, where required.  
Ensure communities are safe, strong and sustainable
Resource Objective: High quality, thriving and sustainable communities
Measure  Comments/Progress Action by Manager 
(where applicable)
Council stock
meeting the
SHQS (% of
dwellings meeting
SHQS) (LGBF)
72.25% of Council stock meeting
the SHQS (% of dwellings meeting
SHQS) against a target of 94%. 
The decrease in this indicator
relates to the delay in the heat and
smoke alarm installation programme
which was affected by no access
and the availability of stock.  
Programme of works
recommenced in August
2022 to install heat and
smoke alarms.
% of total void
rent loss (SSHC)
1.53% of total void rent loss against
target of 1.35%.  Performance
below target due to the continued
impact of Covid-19 on workforce
and supplies. 
Continue to address the
workload associated with
voids 
• a designated void
team in place 
• a number of
efficiency
improvement
actions identified
and 
• close monitoring of
performance.
44

Page 45

Increase settled
accommodation
by converting 40
temporary
accommodation
units to Scottish
Secure
Tenancies by
March 2022
A further 21 units converted during
2021/22 towards the RRTP target of
converting 100 temporary tenancies
to Scottish Secure tenancies by
2024. 
Further progression on
conversion of temporary to
permanent tenancies will
be prioritised in year 4 of
the Rapid Rehousing
Transition Plan. 
5.5.  Scrutiny of change in measure status 
A further action introduced to aid scrutiny of performance, is to highlight and explain
all measures that have changed status from Quarter 2 to Quarter 4. On analysis of
these, nine measures show a decline in performance, mainly due to the impact of the
Covid pandemic. The remaining measures have shown an improvement in
performance or are complete (7 measures). A list of all the measures falling into this
category of further scrutiny is included at Appendix 3. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The Resource Plan takes into account Resource responsibilities in relation to
sustainable development and climate change. 
9.  Other Implications
9.1. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
4 August 2022 
Link(s) to Council Values/Priorities/Outcomes
• The Resource Plan has been structured upon the Vision, Values and Priorities in the
Council Plan Connect 2017-22 
45

Page 46

Previous References
• Housing and Technical Resources Quarter 4 Progress Report 2020-21 
List of Background Papers
• Council Plan Connect 2017-22 – endorsed by the Executive Committee on 8 November
2017 and approved by the full Council on 6 December 2017: mid-term review of Connect
endorsed by the Executive Committee 24 June 2020
• Housing and Technical Resource Plan 2021-22 – approved by the Executive Committee
on 28 April 2021 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lynn Hayes (Performance and Support Advisor)
Ext:  4823 (Tel:  01698 454823)
E-mail:  lynn.hayes@southlanarkshire.gov.uk
46

Page 47

Appendix 1 
Housing and Technical Resource Outcomes 2021-22 
Connect Priority Resource Outcomes
Ensure communities are
safe, strong and
sustainable 
• Availability, quality and access to housing is
improved 
• High quality, thriving and sustainable
communities
• Schools and other places of learning are
inspirational
Promote sustainable and
inclusive economic
growth and tackle
disadvantage
•  The quality of life in the most disadvantaged
communities in South Lanarkshire is
improved 
Get it right for children
and young people
• Protect vulnerable children, young people
and adults
Improve health, care and
wellbeing
• Later life is improved
• Improved health and social care outcomes
for all 
Delivering the Plan and
achieving Best Value
Resource Outcomes
• Provide sound financial stewardship for the
council 
• Deliver and communicate the Council Plan
and ensure high standards of governance
• Support local democracy, council
committees, Integrated Joint Board, elected
members and senior managers
• Promote equality and the well-being of staff
• Develop and implement effective financial
strategies
• Implement a digital and ICT strategy that
meets business needs
• Develop improvement activity and promote
scrutiny
• Improve the skills, flexibility and capacity of
the workforce 
8
47

Page 48

48

Page 49

IMPROVe - SLC Performance Management System   Report printed on 8 Sep 14:43
Quarter 4 : April 2021 - March 2022
Housing and Technical Resources
Resource Plan
(This represents the cumulative position to March 2022)
Performance Report 2021-22
8
49

Page 50

IMPROVe - SLC Performance Management System   Report printed on 8 Sep 14:43
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Promote sustainable and inclusive economic growth and tackle
disadvantage
0 0 0 0 0
Get it right for children and young people 0 0 0 0 0
Improve health, care and wellbeing 5 0 0 1 6
Ensure communities are safe, strong and sustainable 15 3 2 2 22
Delivering the plan and achieving best value 3 2 0 2 7
Total 23 5 2 5 35
Page 1
50

Page 51

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
Improve health, care and wellbeing
Later life is improved
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of adaptations completed in
Council homes
993 adaptations completed in Council Homes. Contextual ------ 993 979 848 476
No of households currently waiting for
adaptations to their home
Target achieved. Green 0 0 0 0 0
% of approved applications for adaptations
completed in year (SSHC)
All adaptations were approved, this measure is demand led. Green 100.00% 100.00% 93.00% 100.00% 100.00%
Average time (working days) to complete
applications (SSHC)
Target achieved. Green 28.00
days
23.49
days
29.73 days 24.82 days 28.00 days
% of standard adaptations to council
houses within agreed appointment times
Target achieved. Green 97.0% 98.3% 93.0% 85.6% 92.4%
% of new build that meets needs of older
people
Target exceeded. Green 8.0% 20.0% 0.0% 0.0% 0.0%
Ensure communities are safe, strong and sustainable
Availability, quality and access to housing is improved
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of lets to Urgent housing (UH) need
households
Although performance is slightly below target, there has been an
increase in the number of lets to urgent need from 1089 in 2020/21 to
1225 in 2021/22.
Amber 60.0% 56.6% 49.2% 51.4% 61.1%
% of homeless and potentially homeless
decision notifications issued within 28 days
of date of initial presentation
Target achieved. Green 98.0% 99.6% 99.4% 99.8% 99.8%
Average length of time in temporary
accommodation
Target achieved. Green 120 days 105 days 108 days 102 days 121 days
% of households provided with temporary
accommodation (SG)
Target achieved. Green 100.0% 100.0% 99.4% 100.0% 100.0%
% of temporary accommodation offers
refused
Target achieved. Green 6.00% 7.42% 8.25% 6.24% 6.84%
Number of times we did not meet our
obligation to provide suitable
accommodation (SG)
Target achieved. Green 0 0 0 0 0
% of Housing Options interventions where
Homelessness prevented
Target achieved. Green 70.0% 73.5% 0.0% 0.0% 0.0%
Page 2
51

Page 52

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
Availability, quality and access to housing is improved
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of new tenancies sustained for more
than a year  for all lets (SSHC)
Target achieved. Green 88.00% 93.40% 89.37% 90.08% 91.90%
Average time taken to relet empty
properties (SSHC)
Target achieved. Green 26.00
days
21.50
days
22.04 days 21.70 days 21.00 days
% of rent due in the year that was lost due
to voids (Operational void rent loss)
(SSHC)
Performance is slightly below target due to the continued impact of
Covid-19 and workload demands associated with voids. The
Resource continues to focus on void management to minimise void
rent loss.
Comparison with performance across local authority landlords is
strong.
Amber 0.53% 0.60% 0.46% 0.49% 0.42%
% of total void rent loss (SSHC) Performance below target due to the continued impact of Covid-19.
Improvement actions identified to minimise rent loss.
Red 1.35% 1.53% 1.08% 1.35% 1.22%
% of tenancy offers refused during the year
(SSHC)
This is a contextual performance measure. Contextual ------ 16.6% 37.1% 30.8% 24.7%
% of response repairs completed on time Target achieved. Green 90.0% 99.1% 97.0% 96.0% 97.7%
Ave length of time to complete emergency
repair - hours (SSHC) - YTD
Target achieved. Green 24.00
hours
4.24
hours
3.23 hours 3.44 hours 3.26 hours
Ave length of time to complete non
emergency repair (SSHC) (LGBF) - YTD
Target achieved. Green 28.00
days
11.76
days
14.32 days 14.19 days 13.07 days
% of reactive repairs completed first time
right (SSHC)
Target achieved. Green 90.00% 99.00% 99.87% 99.91% 99.95%
% of repairs appointments kept (SSHC) Target achieved. Green 90.00% 94.00% 96.15% 94.00% 94.18%
No of times we did not, meet our obligation
to complete the annual gas safety check by
annual anniversary date
At the year end there was one gas safety check outwith target due to
household self-isolating. This was arranged and completed as a soon as
the self-isolation period ended.
Amber 0 1 0 7 411
% of tenant satisfaction with repairs or
maintenance in year (SSHC)
Target achieved. Green 90.0% 91.0% 92.0% 93.0% 90.0%
Page 3
52

Page 53

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of ASB cases resolved in the year
(SSHC)
Target achieved. Green 90.00% 94.30% 88.15% 98.00% 95.21%
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of Council stock meeting the SHQS (%
of dwellings meeting SHQS) (LGBF)
The decrease in this indicator relates to the delay in the heat and
smoke alarm installation programme which was affected by no access
and the availability of stock. However has now recommenced.
Red 94.0% 72.3% 92.5% 93.2% 93.5%
% of council dwellings that are Energy
Efficiency Standard for Social Housing
(EESSH) (LGBF)
Reporting on the new EESSH 2 standard will commence during 2022/23
with a review of housing stock underway to determine the additional
energy measures required to achieve EESSH2.
Contextual ------ 98.64% 91.10% 93.39% 93.88%
Delivering the plan and achieving best value
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of Stage 1 complaints responded to in
full (SSHC)
186 out of 204 stage 1 complaints responded to in full. Contextual ------ 91.00% 98.00% 97.44% 93.00%
Average time in working days for a full
response at Stage 1
Target achieved. Green 5 5 4 4 5
% of Stage 2 complaints responded to in
full (SSHC)
29 stage 2 complaints responded to in full. Contextual ------ 100.00% 96.00% 96.77% 91.00%
Average time in working days for a full
response at Stage 2
Target achieved. Green 20 15 15 17 14
Rent collected as a % of rent due in the
year (SSHC)
Target achieved. Green 96.3% 98.3% 99.0% 99.7% 97.4%
Gross rent arrears (current and former
tenants) as a % of rent due for the year
(LGBF) (SSHC)
Performance slightly below target due to the continued impact of
Covid-19. A range of supports are in place to assist tenants financial
hardship. Performance continues to be routinely monitored.
Amber 8.70% 8.91% 6.78% 7.05% 8.26%
Page 4
53

Page 54

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan Performance Indicators Housing and Technical Resources -
Delivering the plan and achieving best value
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Factoring collection rate An additional £0.5m in revenue was collected when compared to
2020/21 however the annual target was not met.  A number of payment
plans for rechargeable repairs have carried forward into 2022/23.
Amber 77.00% 73.00% 81.00% 78.10% 74.06%
Page 5
54

Page 55

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Promote sustainable and inclusive economic growth and tackle
disadvantage
0 0 0 0 0 0
Get it right for children and young people 0 5 0 0 0 5
Improve health, care and wellbeing 2 3 0 0 0 5
Ensure communities are safe, strong and sustainable 4 12 2 1 0 19
Delivering the plan and achieving best value 0 2 1 0 0 3
Total 6 22 3 1 0 32
Page 6
55

Page 56

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Improve health, care and wellbeing
Later life is improved
Action Measures Comments/ Progress Status
Increase supply of
housing suitable for
older people
Additional amenity standard and wheelchair accessible
homes delivered as per SHIP as reported to Housing and
Technical Resources Committee
94 Amenity/Wheelchair additional housing units were provided across
development sites within South Lanarkshire.
Green
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Sheltered housing support services monitored to ensure
compliance with Care Inspectorate standards.  Outcome of
inspections report to Housing and Technical Resources
Committee and improvement plans developed for any areas
of improvement
No inspections since 2017 however continue to self-asses against
Care Inspectorate framework, identify and progress improvement
actions.
Green
Get it right for children and young people
Protect vulnerable children, young people and adults
Action Measures Comments/ Progress Status
Contribute to effective
joint working in
protecting children and
adults at risk of harm
Annual report on operation of Adult and Child Protection
procedures reported to Resource Management Team during
March 2022
Annual report was delivered in April 2021. A service development
session was delivered in July 2021 for Housing Services and a further
development session for Property Services will be delivered April/May
2022.
Green
Contribute to effective
joint working in
protecting children and
Six monthly reporting to Chief Officer Group (COG) for
Homelessness and Gender Based Violence statistics
Quarterly statistical update provided. Meet with Gender Based
Violence Partnership Co-ordinator to discuss and agree a broader
update during 2022/23 covering prevention activity.
Green
Page 7
56

Page 57

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Get it right for children and young people
Protect vulnerable children, young people and adults
Action Measures Comments/ Progress Status
adults at risk of harm Personal plan developed for all young people moved from
Care to living in their own home on a permanent basis
Good progress made rolling out new pathway plan with around
90% of current young care leavers with housing applications
completed a housing pathway.
Green
Maintain affordable rents for council homes, benchmarked
against the Scottish average - a key action as detailed in the
Local Child Poverty Action Report
The average rent of £74.94 for 2021/22 continues to remain lower
than the Scottish local authority average of £79.71 per week for the
same period.
In recognition of the ongoing financial impact the Covid-19
pandemic is having on many households, the 2022/23 rent
increase for tenants was 2.2%, held at the same level of increase
as 2021/22. This continues to allow investment in services and
properties to be delivered.
Progress against this measure is reported annually within the
South Lanarkshire Local Child Poverty Action Report.
Green
Prioritise allocation of available housing for those in need,
including homeless households - a key action as detailed in
the Local Child Poverty Action Report
In line with the Council's Housing Allocation Policy, housing continues
to be allocated to those most in need.
The council and its Registered Social Landlord partners delivered an
increase in the percentage of social rented properties directed to
homeless households in the year (53.4% of all council homes and 33%
of Registered Social Landlord homes) reducing time spent in
temporary accommodation and minimising the impact on households
with children.
Progress against this measure is reported annually within the South
Lanarkshire Local Child Poverty Action Report.
Green
Page 8
57

Page 58

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Improve health, care and wellbeing
Improved health and social care outcomes for all
Action Measures Comments/ Progress Status
Ensure effective
contribution to health
and social care
outcomes contained
Scheduled reviews of the Strategic Commissioning Plan Housing and Technical Resources have actively contributed to the
development of the latest South Lanarkshire Strategic
Commissioning Plan. This includes the inclusion of housing's specific
contribution to the outcomes of the plan.
Green
within the Strategic
Commissioning Plan
Progress reported as part of the Rapid Re-housing Transition
Plan Annual Report to Housing and Technical Resources
Committee in June 2021
The second annual review of the South Lanarkshire Rapid
Rehousing Transition Plan was completed and presented to Housing
and Technical Resources in June 2021. The review identified that
despite the challenges of the Covid-19 pandemic, good progress had
been made across the different  priorities.
Complete
The Local Housing Strategy reported to Executive
Committee during November 2021
Annual review completed and approved by Executive Committee
November 2021.
Review highlighted good progress made against the indicators within
the Strategy including performance within new supply, homelessness
and energy efficiency. The final year (2021/22) review will be
completed as part of the development of the next strategy, scheduled
for submission to the Executive Committee in 2022.
Complete
Ensure communities are safe, strong and sustainable
Availability, quality and access to housing is improved
Action Measures Comments/ Progress Status
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP
and reported to Housing and Technical Resources
Committee
537 new build properties delivered by to the council. 53
Open Market Purchase properties acquired.
Green
Page 9
58

Page 59

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
Availability, quality and access to housing is improved
Action Measures Comments/ Progress Status
Improve access to
settled accommodation
for homeless
households
Implementation Rapid Rehousing Transition Plan - Year 3 Year 3 Quarter 3 review complete and showing positive progress,
annual review process now underway.
Key measures to report are a further 25% reduction in long-term
homelessness, a 21% reduction in levels of homelessness from 969 in
2020/21 to 765 in 2021/22 and a 19% reduction in the length of time
homeless households spent in temporary accommodation from 223
days in 2020/21 to 181 days in 2021/22.
Green
Increase settled accommodation by converting 40 temporary
accommodation units to Scottish Secure Tenancies by March
2022
A further 21 units converted during 2021/22 towards the RRTP
targeting converting 100 temporary tenancies to Scottish Secure
tenancies by 2024.  Post-covid priorities to maintain levels of
temporary accommodation supply have prevented meeting target.
Further progression on conversion of temporary tenancies to
permanent will be prioritised in year 4 of the Rapid Rehousing
Transition Plan.
Red
Implement Housing First approach.  Provide suitable
accommodation and support for up to 40 individuals with
complex needs by 2023/24
On target, with 33 cases implemented to date.  84% tenancy
sustainment record with 100% tenancies sustained in first 12 months
since April 2021.
Green
Page 10
59

Page 60

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Action Measures Comments/ Progress Status
Ensure continued
implementation of the
Local Housing Strategy
Local Housing Strategy implemented with annual review
reported to the Executive Committee November 2021
Annual review completed and approved by Executive Committee
November 2021.
Review highlighted good progress made against the indicators within
the Strategy including performance within new supply, homelessness
and energy efficiency. The final year (2021/22) review will be
completed as part of the development of the next strategy, scheduled
for submission to the Executive Committee in 2022.
Complete
A Housing Needs and Demand Assessment, including an
assessment of the needs of Gypsy/Travellers, to be
completed by November 2021
The Resource continues to play a significant contribution to the
development of the Glasgow City Region Housing Need and Demand
Assessment. This includes providing analysis and commentary on
different sections within the document, including specialist provision for
Gypsy/Travellers.
As part of the wider HNDA, development of a South Lanarkshire
Gypsy/Traveller accommodation needs assessment will also be
completed in partnership with housing, health and education services
to ensure the right numbers and types of accommodation options are
available. This is scheduled for completion within 2022.
Green
Community Safety
priorities including
relevant parts of the
SLCP are achieved
Progress against Community Safety priorities to the Safer
South Lanarkshire Board on June 2021 and November 2021
Progress updates provided to Safer South Lanarkshire Board as
planned.
Complete
Page 11
60

Page 61

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Action Measures Comments/ Progress Status
Ensure effective
involvement with tenants
and other customer
groups
Customer Involvement Strategy with Annual review (including
programme of Customer Scrutiny) reported to Housing and
Technical Resources Committee
The third annual review of the Housing Services' Customer
Involvement Strategy was presented and approved at Housing and
Technical Resources Committee on 29 September 2021.
The review was completed jointly by officers within Housing and
Technical Resources and customer representatives within the Tenant
Participation Co-ordination Group, providing them with the opportunity
to monitor progress and define the priorities for the year ahead.
Complete
Service Development is
understood by
understanding our
customer satisfaction
levels of key service
areas
Annual customer satisfaction programme approved by
Resource Management Team in May 2021 and delivered The proposed programme for 2021/22 has been reviewed by the
Resource Management Team. Following agreement with the
Scottish Housing Regulator, the scheduled overall review of tenant
satisfaction and factoring service has been postponed until the next
reporting year for the Charter.
For Care Inspectorate monitoring purposes, a one off survey was
completed in relation to Sheltered Housing Tenants. The findings
were very positive, highlighting the quality of service provided
during the pandemic.
For others areas progressing in 2021/22, all survey results will be
analysed and if required, improvement actions identified and
progressed.
Green
Page 12
61

Page 62

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Action Measures Comments/ Progress Status
Key satisfaction levels monitored and reported and published
as part of annual report on SSH Charter performance
December 2021
In relation to the Scottish Social Housing Charter, the Scottish Housing
Regulator published its annual findings on the 31st August 2021.
The annual charter performance report to tenants included this
information and was published in the housing news and online within
the required timescales as set out by the Regulator.
Green
Understand the financial
security of our
customers
Key indicators reported to the Scottish Housing Regulator as
part of annual return on the charter submitted during May
2021
Following submission to the regulator in May 2021, detailed analysis
and monitoring of key indicators related to the financial position facing
our customers continues to be progressed.
Following publication of data by the Scottish Housing Regulator and
voluntary benchmarking groups of which the Council are members,
results have been analysed to understand our position, relative to
other Local Authority landlords.  The Council continues to be the 7th
lowest in terms of average rent levels and affordability.
Green
Page 13
62

Page 63

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Action Measures Comments/ Progress Status
Contributions to the Welfare Reform Group led by Finance
and Corporate Resources
The Resource continues to contribute to the corporate response to
welfare reform.  A 2020/21 update from Housing Services was
included in the report to Corporate Management Team (CMT) in June
2021, and also reported to the Community Planning Partnership Board
(CPPB) on 15 September 2021.
A further Housing Services update covering the first 6 months of
2021/22 was provided and presented to CMT in December 2021 and
to the CPPB on 9 March 2022.
Green
Key actions detailed in the Local Child Poverty Action Report The third annual South Lanarkshire report has now been developed
and similar to the previous Local Child Poverty Action Report (LCPAR),
it contains measures and actions which are structured around three
drivers of child poverty: income from employment; costs of living;
income from social security and benefits in kind.
Within the LCPAR the measures and actions relating to Housing and
Technical Resources are predominately set out within the chapter on
‘cost of living’. They focus around the key areas below, for which
housing makes a clear contribution towards preventing and reducing
child poverty:
• Reducing the costs of housing for families including energy costs;
• Investment to increase new affordable housing supply;
• Preventing and reducing homelessness for households, including
families with children and young people
Green
Page 14
63

Page 64

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Action Measures Comments/ Progress Status
Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement
Site Investment Plans developed in consultation with
residents and planned improvement works completed by 31
March 2022
Work continues to be progressed on both South Lanarkshire sites to
improve facilities and amenities available to residents. These works
are being taken forward in conjunction with site residents, who have
jointly developed site masterplans that highlight key projects they wish
to see take place. In addition a range of other projects are being taken
forward to ensure the sites continue to meet legislative compliance
and standards.
Projects delivered to date include new heating within the amenity
buildings, pitch extensions and a new community facility.
Green
Ensure communities are safe, strong and sustainable
High quality, thriving and sustainable communities
Action Measures Comments/ Progress Status
Improve energy
efficiency stock to help
address fuel poverty
Deliver energy efficiency planned capital investment by 31
March 2022
Delivery of programme was impacted by the continued affect of
Covid-19 and affected the ability to drawdown funding prior to June
2022, therefore, some projects have carried forward into 2022/23
programme.
Amber
Physical regeneration
work in priority areas
Deliver remaining 36 properties as part of Phase 1 of the
masterplan for regeneration at East Whitlawburn along with
Phase 2 (34 units) and Phase 3 (52 units)
112 properties within phase 1,2 and 3 delivered to date, with the
remaining 10 properties to be completed within 2022/23.
Green
Work with partners to bring 15 Long Term empty homes into
use during 2021/22
15 brought back into use using a mixture of advice, assistance and
practical engagement.  Work in relation to empty homes will continue
to be expanded in 2022/23.
Green
Page 15
64

Page 65

IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
IMPROVe - SLC Performance Management System   Report printed on Thursday 8 September 2022
Resource Plan actions and measures Housing and Technical Resources -
Ensure communities are safe, strong and sustainable
Schools and other places of learning are inspirational
Action Measures Comments/ Progress Status
Project Management of
Schools Projects and
General Services
Projects
General Services Programme spend will be achieved for the
financial year
Spend to Q4 £61.587m.  Annual target (Revised Estimated
Expenditure) £72.731m.  Outturns were impacted by the continued
issue of securing supplies and labour at the right time because of the
Pandemic, Brexit and War in Ukraine.
Amber
Support for Early Years Programme - Delivery of 8 new
nursery sites by the end of financial year 2021/22
Eight nurseries now complete. Complete
Delivering the plan and achieving best value
Delivering the plan and achieving best value
Action Measures Comments/ Progress Status
Ensure effective
management of all
Resource budgets and
Business Plans
Overall budgetary targets achieved by March 2022 It is expected that overall budgetary targets will be achieved by the end
of the financial year but all targets have been impacted by the
Covid-19 emergency. Final details will be known once the annual
accounts exercise has been completed.
Green
Delivery of targeted agreed efficiency savings by March 2022 Some efficiency targets will not be achieved in full but are expected to
be offset by other in year underspends.
Green
Progress the council's
Digital Strategy within
the Resource
Replacement Integrated Housing Management and Property
System developed and implemented by June 2022 Overall review with supplier completed, with implementation
phased from end of 2023.
Amber
Page 16
65

Page 66

66

Page 67

Appendix 3
HTR: Quarter 2 to Quarter 4 2021-22 - scrutiny of change in measure status 
Measure Q2  Status Q4 Status Q4 Comments
Performance has declined from Q2 to Q4 
% of lets to Urgent housing (UH)
need households
Green Amber Although performance (56.59%) is
slightly below target, there has been
an increase in the number of lets to
urgent need from 1089 in 2020/21 to
1225 in 2021/22.
Increase settled accommodation
by converting 40 temporary
accommodation units to Scottish
Secure Tenancies by March 2022
Green Red A further 21 units converted during
2021/22 towards the RRTP target of
converting 100 temporary tenancies
to Scottish Secure tenancies by
2024. 
% of rent due in the year that was
lost due to voids (Operational
void rent loss) (SSHC)
Green Amber Performance of 0.60% is slightly
below target due to the continued
impact of Covid-19.  The Resource
continues to focus on void
management to minimise void rent
loss. 
While performance is slightly below
target, comparison with performance
across local authority landlords is
strong
% of total void rent loss (SSHC) Green Red Performance of 1.53% is below
target due to the continued impact of
Covid-19.  The Resource continues
to address void demand with a
designated void team in place and
performance continues to be
routinely monitored with a number of
improvement actions identified.
No of times we did not, meet our
obligation to complete the annual
gas safety check by annual
anniversary date
Green Amber At the year end there was one gas
safety check out with target due to
the household self-isolating. The
check was arranged and completed
as a soon as the self-isolation period
ended.
% of Council stock meeting the
SHQS (% of dwellings meeting
SHQS) (LGBF)
Report
Later
Red The decrease in this indicator relates
to the delay in the heat and smoke
alarm installation programme which
was affected by no access and the
availability of stock.  This
programme has now recommenced.
General Services Programme
spend will be achieved for the
financial year
Green Amber Spend to Q4 £61.587m.  Annual
target (Revised Estimated
Expenditure) £72.731m.  Outturns
were impacted by the continued
issue of securing supplies and
labour at the right time because of
the Pandemic, Brexit and War in
Ukraine.
Gross rent arrears (current and
former tenants) as a % of rent
due for the year (LGBF) (SSHC)
Green Amber Performance is at 8.91% slightly
below target due to the continued
impact of Covid-19. A range of
supports are in place to assist 
tenants facing financial hardship.
8
67

Page 68

Measure Q2  Status Q4 Status Q4 Comments
Performance continues to be
routinely monitored with a number of
improvement actions identified.
Replacement Integrated Housing
Management and Property
System developed and
implemented by June 2022
Green Amber Overall review with supplier
completed, with implementation
phased from end 2023.
Performance has improved/completed from Q2 to Q4 
% of new build that meets needs
of older people
Report
Later
Green Target exceeded.
Progress reported as part of the
Rapid Re-housing Transition Plan
Annual Report to Housing and
Technical Resources Committee
in June 2021
Green Blue The second annual review of the
South Lanarkshire Rapid Rehousing
Transition Plan was completed and
presented to Housing and Technical
Resources in June 2021. The review
identified that despite the challenges
of the Covid-19 pandemic, good
progress had been made across the
different priorities.
The Local Housing Strategy
reported to Executive Committee
during November 2021
Green Blue Annual review completed and
approved by Executive Committee
November 2021. 
Review highlighted good progress
made against the indicators within
the Strategy including performance
within new supply, homelessness
and energy efficiency. The final year
(2021/22) review will be completed
as part of the development of the
next strategy, scheduled for
submission to the Executive
Committee in 2022.
Progress against Community
Safety priorities to the Safer
South Lanarkshire Board on June
2021 and November 2021
Green Blue Progress updates provided to Safer
South Lanarkshire Board as
planned.
Local Housing Strategy
implemented with annual review
reported to the Executive
Committee November 2021 
Green Blue Annual review completed and
approved by Executive Committee
November 2021. 
Review highlighted good progress
made against the indicators within
the Strategy including performance
within new supply, homelessness
and energy efficiency. The final year
(2021/22) review will be completed
as part of the development of the
next strategy, scheduled for
submission to the Executive
Committee in 2022.
Customer Involvement Strategy
with Annual review (including
programme of Customer
Scrutiny) reported to Housing and
Technical Resources Committee
Green Blue The third annual review of the
Housing Services' Customer
Involvement Strategy was presented
and approved at Housing and
Technical Resources Committee on
29 September 2021. 
68

Page 69

Measure Q2  Status Q4 Status Q4 Comments 
The review was completed jointly by
officers within Housing and
Technical Resources and customer
representatives within the Tenant
Participation Co-ordination Group,
providing them with the opportunity
to monitor progress and define the
priorities for the year ahead.
% of council dwellings that are
Energy Efficiency Standard for
Social Housing (EESSH) (LGBF)
Report
Later
Contextual Reporting on the new EESSH 2
standard will commence during
2022/23 with a review of housing
stock underway to determine the
additional energy measures required
to achieve EESSH2. 
69

Page 70

70

Page 71

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources Workforce Plan
2022 - 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose] 
 update the committee on the Housing and Technical Resources Workforce Plan
2022 – 2025 and highlight the key strategic actions required in relation to
workforce planning
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-[recs] 
(1) that the content of the report, be noted; and
(2) that the Housing and Technical Resources Workforce Plan 2022-25
(Appendix 1), be approved.
[1recs]
3. Background
3.1. The Workforce Strategy for the Council was reported to Executive Committee in
2016 and following this Resources developed Workforce Plans covering the period
2017 – 2022. 
3.2. These Workforce Plans outlined the strategic actions required to ensure that
services have the right people, in the right place at the right time to enable delivery of
the Council objectives and statutory requirements. 
3.3. The review of Workforce Plans has been delayed due to the Covid-19 impact and
Resources have now produced plans covering the period 2022 – 2025.   
4. Workforce Planning Toolkit
4.1. The Plans were developed using the Workforce Planning toolkit which includes:- 
Four planning stages: 
Stage one - Determine the Business Strategy
Through this stage an analysis of the key internal and external drivers for the
Resource is undertaken to determine how these will inform the services to be
delivered and the numbers and skills required in the workforce to achieve the desired
outcomes. 
9
71

Page 72

Stage two - Analyse and discuss relevant data
This stage assesses relevant and available data relating to the current profile of the
workforce and any observations and predictions around future resourcing
requirements.
Stage 3 – Agree objectives of the plan
Information from Stage 1 and 2 is used to identify what the plan is trying to achieve,
which will then need to be reviewed against available resources.  
Stage 4 – Agree actions and implement plan
This stage is the culmination of stages 1-3 where Resources and the HR Business
Manager develop an action plan to address risks that have been identified in relation
to the Resource’s ability to deliver business objectives. 
5. Workforce Plan Overview
5.1. The Workforce Plan, including the action plan, for Housing and Technical Resources
is attached as Appendix 1. The Plan provides an overview of the services delivered
by the resource, the service demands and a workforce profile. This, along with the
strategic plans and drivers, were used to identify the objectives and actions required.   
5.2 For Housing and Technical Resources the key challenges for workforce planning
that have been identified are:  
• The demographic profile of the workforce and the impact on succession
planning
• The ability to recruit and retain employees 
• The development of the current workforce to ensure skills are available to
deliver in key strategic areas for future developments and changes in respect
of Climate change and sustainability and new IT technology
• Refugee Resettlement Programme expansion and widening asylum dispersal
• Maintaining employee wellbeing and resilience  
5.3. The specific actions identified to address these challenges are: 
• Improved recruitment practices to attract and retain employees
• A graduate and other apprenticeship approach to recruitment
• Further expand links with schools and colleges to encourage those to
consider a role with the council
• Expand on methods, training and development to grow our own talent and
future proof the workforce
• Robust Succession Planning, across several key areas
• A review of working practices, making improved use of workforce/assets and
consider future needs to deliver key services, in changing environment
• Optimise the efficiency of the existing workforce including staff absence cover: 
application of employee supports/wellbeing; application of Maximising
Attendance processes and maintaining a solution-focused approach to
complex issues 
5.4. This aligns with the general common themes from all Resource action plans which
are:
• Increased demand and a reduced workforce pool - this is a national issue
• Demographic challenges – increased turnover, employees retiring earlier than
expected and succession planning
• Employee wellbeing 
72

Page 73

6. Risk Implications
6.1. The actions identified will assist the Resource in having the right people with the right
skills to deliver services, however there are risks if these actions cannot be
delivered:
• Reduced workforce supply is a risk to delivering the actions identified and this
can be mitigated by adapting services to be delivered within workforce
available 
• Ability to maintain service requirements given the time taken to train and
develop employees to achieve the required skills mix given the complexity of
skills set required across the different roles
• Competing recruitment drives across authorities and other service providers
could mean a reduced staffing level in some areas
7.  Monitoring the Plan
7.1. The action plan will be monitored through the Resource Management Team as the
arrangements on national initiatives emerge and any significant changes will be
reported though the Corporate Management Team. 
8. Employee Implications
8.1 Having a proactive workforce planning process in place ensures an effective
workforce is in place to deliver our services. 
9. Financial Implications
9.1. There are no costs associated with undertaking the workforce planning process and
any financial implications that have been detailed in the action plan will be met within
existing resources 
9.2. Planning for appropriate workforce arrangements demonstrates effective and
efficient use of resources. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for Climate Change, sustainability or the environment in
terms of the information contained in this report. 
11. Other Implications
11.1. The risks associated with the workforce plan are outlined in Section 6 
11.2. There are no other issues associated with this report.   
12. Equality Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
12.2. There is also no requirement to undertake any additional consultation in terms of the
information contained in this report. 
Annette Finnan
Interim Executive Director, Housing and Technical Resources 
12 September 2022 
73

Page 74

Link(s) to Council Values/Priorities/Outcomes
• Focused on people and their needs
• Working with and respecting others
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving
• Fair, open and sustainable
• Excellent employer 
Previous References
 Housing and Technical Resources Committee, 4 October 2017
 Executive Committee of 13 April 2016 - Workforce Planning Strategy 
 Executive Committee of 8 March 2017 – South Lanarkshire Council Workforce Plan,
2017- 2020 
List of Background Papers
 none 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:  845 4647 (Phone:  01698 454647)
Email:  elaine.maxwell@southlanarkshire.gov.uk 
74

Page 75

Housing and Technical Resources 
Workforce Plan
2022 - 25
1) Introduction and Background
The purpose of this Plan is to outline the key strategic drivers for the Housing and Technical
Resources workforce to the current and future challenges and ensure these are aligned to
Council challenges, risks and new developments.
2) Resource Overview
The Executive Director oversees two service areas withing Housing and Technical
Resources which help to ensure that the council operates successfully in an increasingly
complex and challenging environment, and although diverse, each service is essential to the
running of the council and the delivery of its vision, values and priorities.   
Housing Services is the fourth largest social landlord in Scotland and is responsible for
providing a comprehensive housing management service, proving a homelessness, and
housing support service, working to prevent and alleviate homelessness, support
independent living, improve levels of tenancy sustainment, and support vulnerable
households in our communities including refugees.  The service provides both strategic
and support functions across the resource, contributing to the Council and national
agenda, including community safety and the development and delivery of additional
affordable homes. 
Property Services are responsible for managing the council’s portfolio of properties
and land and includes Building Services, Assets and Estates and Consultancy Services. 
These Services have a wide range of responsibilities including working with all other
Resources to develop, design, procure and, where appropriate, deliver property
construction programmes.  The Service also delivers maintenance works across the
property portfolio, including the out of hours repairs service and manages properties for
sale and lease and carries out legislative compliance works including electrical testing
and gas safety checks.  The Service also provides strategic support to the Resource
and council for the energy efficiency and sustainability agenda. 
Resource Overview
The Housing and Technical Resource Plan (2022/23) has identified the main challenges, risks
and new developments which will have significant impact on the delivery of services in the
coming year. Key areas of focus are:
• Covid recovery 
• Health and Wellbeing
• Legislative and Policy Changes 
• Education Growth and capacity School Estate
• Asset Management – review asset requirements in light of changing council and
service user needs and opportunities it presents
• Preventing and alleviating Homelessness and tenancy sustainment
• Resettlement programme expansion and widening asylum dispersal
• Health and Social Care contribution
• Changing work streams linked to the overall management of the Council’s asset and
meeting targets set e.g. Climate Change & Sustainability
9
75

Page 76

Strategic Drivers
The Resource Plan sets out the key areas of focus, as well as strategic drivers and policy
frameworks that will have an impact on Housing and Technical Resources and the
workforce:
• Financial savings and efficiencies
• Covid recovery - continued response and recovery to the impact of COVID pandemic
ensuring resilience in the workforce to respond to future outbreaks 
• Recruitment and retention - there is increased number of retirals, flexible working
requests and turnover which results in a reduced workforce availability.  
• Pay and reward - increased demands to ensure that pay and reward remains
competitive and attractive to employees 
Strategic Plans
All of the above is factored into the key strategic plans which Housing and Technical
Resources is a key contributor or partner to.  The main plans covering each of these areas
are: 
• South Lanarkshire Community Plan 2017-27
• South Lanarkshire Council Plan 2022 - 27
• South Lanarkshire Children’s Services Plan 2021-23
• Sustainable Development and Climate Change Strategy
• Local Housing Strategy and Rapid Rehousing Transmission Plan
• Housing and Technical Resource Plan and associated Service Plans 
3) Current Workforce and People Skills Required
The Resource currently has 1345 FTE employees, which are broken down as follows:
Service FTE
Housing Services (including Directorate) 426.15
Property Services  918.85 
General Workforce information:
• 49% workforce is 50 years old or over. 
• In 2021/22 there have been an increase in the number of retirals, requests for
flexible working and reduction in working hours. 
• For 21/22 the absence rate was 6.1% and the turnover was 6.24% 
Workforce Challenges
At present, there are a number of workforce challenges for Housing and Technical
Resources directly impacting on the ability to fully meet current demand, as summarised
below: 
• Workforce availability – there are challenges recruiting some roles in Housing
Services (e.g. Housing Officers) and technically qualified roles such as Quantity
Surveyors, this has led to increased pressure on the existing workforce, covering
vacancies. 
76

Page 77

• Ageing workforce – the profile of the workforce in South Lanarkshire is working
against demand, with a significant proportion of the workforce being in the 50-70 age
bracket (49%). As a result of the COVID pandemic there is evidence that people are
re-evaluating priorities with a potential further increase in earlier retirals 
4) Objectives of the Plan
The objectives of this workforce plan are to consider how the above strategic priorities and
areas of service demand can be mitigated against and managed over the course of the next
5 years.  Delivering more of the same will not necessarily solve these challenges, and the
Services will have to consider new ways of working, including transformational change. 
Some of the principles underpinning how this will shape the workforce moving forward have
already been set out in the strategic plans referred to above.   
5) Actions and Recommendations
A number of key actions have been identified to manage the demands and challenges
anticipated over the next 5 years with the main ones being:
• Review existing recruitment practices inclusive of adverts, use of social media and
refreshed and updated job descriptions, where applicable
• Further development of the graduate apprenticeship approach for securing professional
roles
• Build on existing contacts with Schools and Colleges to encourage more applicants 
• Strengthen links with employability to access a wider audience
• Look across the Council to access routes to ‘Grow our own’ and future proof our
workforce
• Look at the existing structures and skills or skills base and plain what is required to
deliver the services moving forward across all areas
• Succession planning across a number of key areas, and building leadership capacity
• Optimise the efficiency of the existing workforce including staff absence cover: 
application of employee supports/wellbeing; application of Maximising Attendance
processes and maintaining a solution-focussed approach to complex issues. 
77

Page 78

Finance and Corporate Resources
Workforce Action Plan 2022 - 2025            Appendix 1
Priority/Identified
Needs.  What are
the future
workforce
priorities based
upon your supply
and demand
analysis?
Actions
What specific actions that
are needed to deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else needs
to be involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
Workforce / HR       
Increased
demand and
reduced
workforce pool
Revised recruitment
practices, greater use of
social media and campaign
approach, consider graduate
and other apprenticeship
approach and opportunities
to develop current staff 
Fill vacancies with
suitably skilled
candidates
Heads of Service
/ HR Business
Manager
HR advisers Annual none
Pay and reward Promote benefits of working
in SLC 
Recruitment and
retention 
Heads of Service
/ HR Business
Manager 
Ongoing 
Savings and
Efficiencies
requirements
Identify savings
requirements and continue
to make efficiencies, review
working practices, making
better use of assets e.g.
property/fleet and
technology
Efficient
deployment of
resources to
deliver service,
smarter use of
property, fleet,
technology and
people resources
Executive
Director
Heads of Service
and HR Business
Manager
Annual 
Increased number
of retirals
Quantify likely turnover
Succession Planning, 
Develop entry options into
posts. 
Recruitment to
maintain agreed
staffing levels 
Head of Service HR Business
Manager
Annual review 
78

Page 79

Increased flexible
working requests
Monitor impact
Review criteria 
Reduce impact on
service delivery
Heads of Service
/ HR Business
Manager
HR Business
Manager
2022/23 
Increased career
break requests
Monitor impact
Review criteria 
Reduce impact on
service delivery
Heads of Service
/ HR Business
Manager
HR Business
Manager
Ongoing 
Employee Health
and Well being
Maintain support and explore
additional support methods
Improved
attendance,
retention
Heads of Service
/ HR Business
Manager
HR Business
Manager
Ongoing 
Changing
workload
demands
Identification of future
workload needs to meet
national and council
priorities and statutory
requirements in relation to
Housing Standards, Climate
Change and Sustainability
and wider asset
management
In-house workforce
aligned to future
work needs 
Maintain high
productivity levels
across the
workforce 
Potential
opportunity for
commercialisation
Workforce is fully
aligned to future
work needs 
Executive
Director / Head of
Service / HR
Business
Manager 
Training &
Development
Implementation of:
- Fusion project
- Integrated Housing &
Property
Management System
Streamlined and
more efficient
working practices
Heads of Service
/ HR Business
Manager   
79

Page 80

80

Page 81

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Scottish Housing Regulator – Annual Assurance
Statement 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval to submit the Annual Assurance Statement for South Lanarkshire
Council to the Scottish Housing Regulator 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the South Lanarkshire Council Annual Assurance Statement 2021/2022
(attached as Appendix 1) be approved and submitted, to the Scottish Housing
Regulator. 
3. Background
3.1. The Scottish Housing Regulator (SHR) was established in 2011 as an independent
body directly accountable to the Scottish Government to regulate registered social
landlords (RSL’s) and local authority housing and homelessness services.  The SHR
does this by assessing and reporting on social landlord’s delivery of services, RSL’s
financial well-being and standards of governance and where necessary, the SHR will
intervene to secure improvements. 
3.2. Following a consultation process, the SHR published a revised Regulatory
Framework in February 2019. 
3.3. Local authority landlords are required to submit an Annual Assurance Statement
confirming compliance with regulatory requirements which, should also, if
appropriate, identify any material breaches.  Examples of such material breaches
specific to Local Authorities include those that seriously affect the interests and
safety of tenants, people who are homeless or other service users; threaten the
stability, efficient running or viability of service delivery arrangements and bring the
landlord into disrepute or raise public or stakeholder concern about your organisation
or the social housing sector. 
3.4. South Lanarkshire’s Annual Assurance Statement for 2020/21 was approved by
Housing and Technical Resource’s Committee on 29 September 2021 and
subsequently submitted to the SHR in October 2021.
10
81

Page 82

4. South Lanarkshire Council Annual Assurance Statement
4.1. The Annual Assurance Statement 2021/2022 for the Council is attached as Appendix
1. As recommended by SHR guidance, this is short, succinct and based upon the
format provided by the regulator. 
4.2. The key requirement of the Annual Assurance Statement is for the Committee to
confirm that it is confident that appropriate systems, evidence, relationships and
channels of communication are in place to ensure the effective planning, delivery
and monitoring of relevant services against statutory and regulatory requirements. 
4.3. Within South Lanarkshire, the assurance required is provided through a wide range
of arrangements which are in place, at a Council and Resource wide level.  A
summary of the key requirements for assurance and how these are addressed is
attached as Appendix 2. 
4.4. The Regulator recognises that that councils and Registered Social Landlords are
continuing to work to recover from the impact of the pandemic and fully restore
services and programmes of work and appreciates that the pandemic may,
therefore, continue to impact on compliance with regulatory requirements. 
The Council is, therefore, required to identify any non-compliance with regulatory
requirements that is directly due to the pandemic and distinguish this from non-
compliance for other reasons.
4.5. Provided that tenant and resident safety is not compromised, the SHR continues to
indicate they will not engage with a landlord where it does not fully comply with
regulatory requirements, specifically where the non-compliance is exclusively or
largely a consequence of the pandemic, and the landlord has effective plans to
return to full compliance. In relation to this year’s statement there are two points,
highlighted below, where the Council is partially compliant due to the ongoing effects
from the pandemic:-
• Fire safety for Gypsy/Traveller sites
• Scottish Housing Quality Standards (SHQS) – Fire Tolerable Standards and
Fixed Electrical Testing 
4.6. In relation to the Council’s two Gypsy/Traveller sites, a programme of improvement
work has progressed and compliance in terms of the revised fire safety standards
has now been fully met at one of the sites, and partial compliance at the other.
Progress at the Council’s larger site at Shawlands Crescent in Larkhall is now well
advanced and will be fully compliant by end of November 2022. Fire safety guidance
continues to be a key focus of activity for the Council. 
4.7. In relation to SHQS and the reporting requirements of Fire Tolerable Standards and
Fixed Electrical Testing, a programme of work has progressed well, however a
number remain outstanding due to issues in relation to the availability of the required
equipment and also the ability to gain access to properties to carry out the
installations/testing.  A further programme of work is now in place to address these
issues which is being closely monitored within the Resource.
82

Page 83

4.8.  In relation to equalities and human rights, Sector guidance on equalities data
collection, ‘Collecting equality information: National guidance for Scottish social
landlords’ was published in August 2021 and updated in June 2022. In this year’s
Annual Assurance Statement, social landlords are asked to provide assurance that
they have or are in the process of implementing an effective approach to the
collection of equalities information and are considering how a human rights approach
to their work can be adopted. This has been reflected in the proposed Annual
Assurance Statement. 
5. Next Steps
5.1. Subject to approval, the Annual Assurance Statement will be signed off by the Chair
of Housing and Technical Resources Committee and returned, as required, to the
Scottish Housing Regulator to confirm the required assurance. 
5.2. The results of the Annual Return on the Charter 2021/22 are presented as a
separate report to this Committee. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. There are no financial implications associated with this report. 
8. Other Implications
8.1. There are no additional risks associated with this report.
8.2. There are no sustainable development issues associated with this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, strategy or plan and is not subject to
impact assessment requirements. 
9.2. In addition to regular regular discussion with the Tenant Participation Co-ordination
Group on performance and Charter reporting, specific engagement has taken place
to confirm arrangements for the development and submission of the Annual
Assurance Statement 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
22 August 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent 
Previous References
 Our regulation of Scottish Housing – H&TR Committee Report 23 January 2019
 Scottish Housing Regulator - Regulation of Social Housing in Scotland – H&TR
Committee Report 4 September 2019
 Scottish Housing Regulator – Annual Assurance Statement – H&TR Committee Report
25 November 2020
 Scottish Housing Regulator – Annual Assurance Statement – H&TR Committee Report
29 September 2021 
83

Page 84

List of Background Papers
 Our Regulation of Scottish Housing – a discussion Paper January 2018
 Our Regulation of Scottish Housing – a Consultation October 2018 
 Our Regulation of Scottish Housing – Final Framework 2019 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Cameron Mitchell
Ext:  845 4862
E-mail: cameron.mitchell@southlanarkshire.gov.uk 
84

Page 85

Appendix 1 
Housing and Technical Resources
Executive Director Daniel Lowe 
Our Annual Assurance Statement 
South Lanarkshire Council complies with the regulatory requirements set out in Chapter 3
of the Scottish Housing Regulator’s Framework. This includes that we: 
▪ achieve all standards and outcomes in the Scottish Social Housing Charter for tenants,
people who are homeless and others who use our services 
▪ comply with all our legal obligations relating to housing and homelessness, equality and
human rights, and tenant and resident safety with the exception of the following:- 
• In relation to the Council’s two Gypsy/Traveller sites, a programme of
improvement work has progressed and compliance in terms of the fire safety
standards has now been met at one of the sites, and partial compliance at the
other. Progress at the council’s site at Shawlands Crescent in Larkhall is now
well advanced and will be fully compliant by end of November 2022.  Fire
safety guidance continues to be a key focus of activity for the Council.
• In relation to SHQS and the reporting requirements of Fire Tolerable
Standards and Fixed Electrical Testing, a programme of work has progressed
well, however a number remain outstanding due to ongoing issues with the
availability of equipment and ability to gain access to properties to carry out
the installations/testing.  A further programme of work is now in place to
address these issues and will be closely monitored by the council. 
In relation to equalities data collection and human rights, the Council has well established
processes and policies in these areas, with consideration already embedded in how we
deliver services. Work is being progressed to further develop and adjust our existing
approach to the collection of equalities and human rights information along with other
changes to reflect the requirements of the regulatory guidance. 
On an ongoing basis, the Housing and Technical Resource’s Committee consider the
information and evidence necessary to provide the required assurance. 
The Annual Assurance Statement for 2021/22 was approved at the meeting of our Housing
and Technical Resources Committee on 5 October 2022. 
Chair’s signature: 
Date: 
85

Page 86

Appendix 2
Assurance Requirements 
What Assurance required How assurance is evidenced
Monitor and
report
performance
Performance Management
Framework in place and
appropriately reported 
On an annual basis a report is provided
to Housing and Technical Resources
Committee on performance against
Scottish Social Housing Charter
requirements. Performance against the
charter requirements for 2021/22 will be
reported to H&TR Committee on 5
October 2022. 
Effective Resource and Service
planning arrangements are in
place. 
Resource and Service plans are in
place to monitor progress at different
levels of the planning hierarchy ie,
Community Plan, the Connect (Council)
Plan, Resource and Service Plan
actions and measures. 
Progress against Connect and
Resource Plan objectives are reported
to Housing and Technical Resources
and Executive Committee on a twice
yearly basis. 
Appropriate Internal Audit
arrangements are in place 
A comprehensive internal audit
programme is reviewed and
implemented yearly in line with service
requirements. 
Progress against the audit programme
is reported to Finance and Corporate
Resources Committee. 
Equality and
Diversity 
Equality and diversity issues are
effectively considered when
making decisions.
Work within the Resource in relation to
equality and diversity is reported to
Housing and Technical Resources
Committee on an annual basis. The last
reported was presented on 8 December
2021 and is next scheduled to be
presented on 14 December 2022. 
Involve
tenants and
other relevant
service users 
Council and Resource Customer
satisfaction levels 
The Resource has a rolling programme
of customer satisfaction surveys in
place. These are used to inform policy
and service development.
Key results from the survey programme
are reported to the Housing and
Technical Resources Committee as
part of the annual report on
performance against the Scottish Social
Housing Charter.
86

Page 87

What Assurance required How assurance is evidenced 
Customer Involvement and
Scrutiny Programme in place
and being delivered 
Progress in relation to customer
involvement and scrutiny was reported
to committee as part of the annual
review of the Customer Involvement
Strategy on 29 September 2021.  This
will also be reported to Committee on
5 October 2022. 
Legal
obligations
Ensure that all legal obligations
associated with housing and
homelessness are adhered to.
The Resource Strategy and Policy
Review Framework ensures policies
and strategies are reviewed on a
cyclical basis to confirm that they are
delivering the intended outcomes,
reflect changes in policy/services
context and are consistent with legal
and regulatory requirements. 
An update on the framework is
presented to Housing and Technical
Resource’s Committee on an annual
basis. This will be reported to
Committee on 14 December 2022. 
Risk Management Strategy is reported
to the Housing and Technical
Resource’s Committee on a yearly
basis. This will be reported to Housing
and Technical Resource’s Committee in
December 2022. 
This corporate approach to risk
management promotes consideration of
risk in service delivery, planning and
decision making processes.  The
Strategy requires Resources to record
and review risks and control actions
regularly.   
Tenant and
resident safety
Have evidence to ensure that all
legal obligations associated with
tenant and resident safety are
met.
Effective systems for monitoring and
reporting health and safety issues are
in place within the Resource and
monitored through the Corporate
Management Team. Any proposals to
address emerging health and safety
requirements would be reported to
Housing and Technical Resources
Committee and the Annual Return on
the Charter. 
87

Page 88

88

Page 89

Report
Agenda Item      
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: South Lanarkshire Council's Strategic Housing
Investment Plan 2023-2028 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on progress delivering affordable housing through the
Strategic Local Programme Agreement (SLPA) during 2021/2022
 seek approval for the Strategic Housing Investment Plan (SHIP) for the
five-year period from 2023-2028 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the progress made in increasing the supply of affordable housing
through the SHIP 2022-2027 and SLPA, be noted, and
(2) that the content of the SHIP 2023-2028, as set out in Appendix 3 to this
report, be approved. 
3. Background
3.1. The SHIP is a five-year rolling plan which links the strategic priorities identified in
South Lanarkshire’s Local Housing Strategy (LHS) to a strategic plan for the delivery
of additional affordable housing. The purpose of the SHIP is to guide the allocation of
available Scottish Government investment funding to meet the affordable Housing
Supply Target as set out in the LHS and the associated priorities and outcomes. 
3.2. The previous LHS, covering the period 2017-2022, is ending and a new strategy is
currently at the consultation stage, covering the period 2022-2027. Following this, the
finalised strategy will be presented to Executive Committee on 30 November 2022
for approval. 
3.3. Aligned to statutory guidance, the consultative draft includes provisional Housing
Supply Targets. These are calculated through evidence collated within the regional
Housing Needs and Demand Assessment 3 (HNDA3), existing Local Development
Plan and locally set targets. For the 2022-2027 period, the provisional target has
been set between 1,250-1,500 additional affordable homes.  Taking account of
current fiscal and market pressures within the construction industry, the target range
aims to provide flexibility over the five year period.
11
89

Page 90

3.4. The Scottish Government uses SHIPs to inform the allocation of the affordable
housing investment grant funding through a Strategic Local Programme Agreement
(SLPA) for each local authority area.  Thereafter, the SLPA informs the development
of separate local programme agreements between the local authority and the
Scottish Government and Registered Social Landlords (RSLs) and the Scottish
Government. 
3.5. The Council’s previous SHIP was approved by Housing and Technical Resources
Committee in September 2021 and covered the five-year period from April 2022 to
March 2027.  The SHIP and SLPA are reviewed and updated annually and this
review takes account of progress made in delivering affordable housing across South
Lanarkshire during 2021/22, and planned progress in the current year 2022/2023,
aligned to the RPAs issued by the Scottish Government. 
4. Impact of COVID-19
4.1. The impact of the COVID-19 restrictions interrupted all sectors of society, affecting
the construction and housing sectors’ ability to reach the national target for 50,000
affordable homes by March 2021. The target for completion of these homes was
extended to 2021/2022, as detailed in the national housing strategy ‘Housing to
2040’. 
4.2. Despite the challenges presented by the Covid-19 pandemic, the Council and its
RSL partners have continued to make positive progress on increasing the supply of
affordable housing across South Lanarkshire. This includes the Council being on
track to achieving its own target of delivering 1,000 additional council homes, set in
2017, within 2022/2023. 
5. Links to national strategy 
5.1. The national long-term housing strategy ‘Housing to 2040’, sets out a vision and
principles which focus upon the vital role of which good housing and homes play in
supporting health, wellbeing, life chances and employment opportunities. 
5.2. The strategy also includes a route-map, setting out high level actions to achieve the
stated visions and includes a number of actions relevant to the supply of new
housing. These actions will be considered further in relation to any new proposals for
the development of affordable housing in relation to location, construction, quality of
new housing, options for financing, and involving the community in the development
process. 
5.3. A long term ambition has been set out in the national Programme for Government to
deliver an additional 110,000 affordable homes by 2032, with at least 70% of these
to be for social rent. 
5.4. Of this figure, 55,000 of these affordable homes are to be delivered by 2027. The
further 55,000 homes to be delivered by 2032, including accelerating investment
funding towards bringing existing homes into the programme, as well as building new
homes. 
5.5. Locally, the SHIP sets out the capacity for 2,562 units across South Lanarkshire
during the period up to 2028, including new build and acquisitions.
90

Page 91

6. Investment grants and construction tender prices
6.1. The Scottish Government’s Affordable Housing Investment Benchmark Working
Group worked with the housing sector and CoSLA to undertake a review of the
affordable housing benchmark system and published revised information on this in
October 2021. 
6.2. The revised baseline benchmark was set for local authorities at £71,500 (3-person
equivalent), with the option to apply additional quality measure benchmarks where
there was an increase to the specification of properties to include items such as
space for work or study, fire suppression systems, zero emission heating systems
amongst others, with could increase the figure to £84,800. 
6.3. Local authorities across Scotland are now working to the revised benchmark levels.
Locally, the Council has based applications for grant funding under the new scheme
on a financial assessment to confirm that the development will not have an adverse
impact on the Housing Revenue Account business plan or rent affordability. 
6.4. The Scottish Social Housing Tender Price Index measures the movement in
construction costs of social housing in Scotland.  The latest published quarterly
briefing (June 2022) indicates tender prices for social housing in Scotland are rising
steadily. In Q4 21/22 they were up 4.0% on the previous quarter and 8.3% on the
same quarter a year earlier. Underlying construction costs of labour, materials and
plant contributed to these rises. We will continue to monitor these costs for future
projects to ensure the Council achieves best value for money. 
7. SLPA progress 2021/2022 
7.1. Closely working with RSL partners and the Scottish Government, a total of 551
additional affordable homes for social rent were delivered across South Lanarkshire.
This included 189 new homes built by three developing RSLs and 362 additional
homes delivered by the Council, including those purchased through the council’s
Open Market Purchase Scheme (OMPS). 
7.2. The additional affordable supply delivered in 2021/22 includes a mix of 385 units
(70%) for general needs and 166 (30%) for particular needs/amenity standard
housing. In compliance with Scottish Government grant requirements, all homes
constructed on behalf of the council or RSLs meet Housing for Varying Needs
Standard. 
7.3. Appendix 1 provides a summary of the Council and RSL completions during
2021/2022. 
8. Home+ Programme 
8.1. The Council will continue to deliver on its Home+ programme to increase the supply
of council homes through the building of new homes and purchasing existing homes. 
8.2. The previous target of delivering 1,000 units will be achieved in 2022/2023 with a
breakdown of projects detailed in Appendix 2. 
8.3. As such, subsequent reports will be presented to Housing and Technical Committee
to seek approval for the delivery of sites for new homes and market purchases, that
will contribute to the delivery of the SHIP and assist in achieving national supply
targets as set out at 5.3.
91

Page 92

8.4. Home+ assists in increasing the supply of specialist housing to meet particular
needs.  Of the 1008 additional homes built or under construction to date, 383 homes
(38%) are designed for particular needs, including 168 (17%) barrier free lift access
amenity flats and 70 (7%) bungalows designed to meet the needs of older people
and wheelchair users.  This exceeds the 8% wheelchair housing target set within the
LHS for the proportion of new build social homes built to wheelchair accessible
standards. 
8.5. The Council’s Open Market Purchase Scheme (OMPS) is closely aligned to the LHS
priorities and targets the purchase of property to increase the council’s supply of
priority house types and sizes depleted through Right to Buy.  The key aims are to
meet specific and urgent housing needs and wider housing quality improvement and
regeneration priorities.  In 2021/2022, 53 homes were purchased through the
scheme and a further 60 have been budgeted for acquisition during 2022/2023. 
8.6. The OMPS has represented a cost effective and efficient method of delivering much
needed additional homes in priority areas, particularly in cases where an urgent
housing need can be met. While the new SHIP proposes to continue open market
purchases throughout the five-year period, the actual outturn will be driven by the
availability of investment grant and the supply and value of properties being brought
to the market. 
9. Resource Planning Assumptions (RPAs) 2023/2024 to 2027/2028
9.1. As noted in Table A below, the SHIP has been prepared taking account of estimated
RPAs of £152.3 million for planning purposes, for the future period from April 2023 to
March 2026. In accordance with the guidance, for planning purposes, councils are
asked to over-programme by a factor of 25% per year to allow for slippage in the
programme. 
Table A: Resource Planning Assumption Levels
Financial
Year
Scottish Government
RPA (£0.0M) 
SHIP Planning Assumptions
RPA + future year capacity*
(£0.0M)
2023/24 £30.074 £37.592
2024/25  £30.180 £37.725
2025/26 £30.680 £38.350
2026/27 £30.680** £38.350
2027/28 £30.680** £38.350
Total £152.30 £190.37 
* RPA + 25% slippage factor applied 
** Subject to future years funding commitment 
9.2. The development priorities and potential grant funding requirements reflect the
development capacity of potential sites that could be brought forward to increase the
supply of affordable housing in South Lanarkshire.
92

Page 93

10. South Lanarkshire SHIP 2023-2028
10.1. A copy of the proposed SHIP and associated table of priority sites is appended to
this report (Appendix 3).  The document has been updated in line with national
guidance and provides a detailed context and rationale for the priorities which could
be delivered over the five-year period to March 2028.   
10.2. Table 1 annexed to the SHIP sets out priorities for grant funding to be delivered over
the rolling five-year period of the SHIP (April 2023 to March 2028). 
10.3. The SHIP 2023-2028, includes projects with a total potential capacity for delivering
up to 2,562 affordable homes in South Lanarkshire over the five-year period to
March 2028, including 2,262 new build homes and 300 to be purchased through the
OMPS. The actual new build output will be subject to a detailed development
assessment of the viability of each site as well as the level of grant funding which will
be available for each project over the period to 2027/2028. 
10.4. Table B below illustrates the anticipated distribution of new build completions across
the four housing market areas in South Lanarkshire over the five-year period,
alongside the percentage increase of each compared within existing housing for
social rent in that area. Table B also includes the 350 units to be purchased in
priority areas across all market areas of South Lanarkshire.
Table B: SHIP distribution by Housing Market Area 
Clydesdale Hamilton East Kilbride Rutherglen/
Cambuslang
OMP 
(All areas)
South
Lanarkshire
Units 332 810 807 313 300 2,562
% of total SHIP
(ex OMP) 14% 36% 36% 14% n/a 100%
Total units of
existing social
housing in HMA
6,177 6,686 11,250 7,149 n/a 31,262
% increase
against existing
in HMA
5.3% 12.1% 7.1% 4.4% n/a 8.2% 
10.5. The SHIP tables reflect development progress and comprise a combination of
projects rolled forward from the previous SHIP and new sites consistent with LHS
strategic priorities.  The information provided includes estimates of site capacity, the
mix of general or special needs housing to be provided, indicative site start and
completion dates, along with associated grant funding requirements, based on the
current Housing Subsidy Target levels.   
10.6. The assumptions and forecasts set out in the tables are based on the best
information available at the time of preparation and will be subject to refinement as
part of the annual review of the SHIP and preparation of SLPAs as individual
projects are developed.   
10.7. In accordance with the guidance, the SLPA will continue to be managed, reviewed
and refreshed annually in consultation and agreement with the Scottish Government
and RSL partners. 
93

Page 94

11. Next Steps
11.1. To achieve specified timescales, the SHIP 2023-2028, as detailed in Appendix 3, will
be submitted to the Scottish Government by 28 October 2022 subject to approval by
Committee. The Scottish Government’s Housing Supply Team (More Homes
Division) will collate the South Lanarkshire SHIP into a national programme for
Ministerial approval and thereafter the SLPA will be prepared for sign off by each
local authority.   
11.2. Once the SLPA is finalised, the Scottish Government will issue individual programme
agreements for RSL and council projects covering the units, tenure mix, subsidy
levels, site start and completion dates, as these come forward. Monitoring and
review of the delivery programme by the council, its RSL partners and the Scottish
Government will take place on an ongoing basis throughout the year. 
11.3. To enable the delivery of the SHIP, and contribute to national targets, additional
reports will be presented to Housing and Technical Resources Committee seeking
approval to build or purchase new homes across South Lanarkshire.   
11.4. A report monitoring delivery of the Council programme will be presented to Housing
Committee as part of the annual SHIP report. 
12. Employee Implications
12.1. There are no employee implications arising from the information presented in this
report. 
13. Financial Implications
13.1. Any financial impact relating to the costs of delivering additional council housing will
be detailed in reports presented to Housing and Technical Resources for
consideration and approval. 
13.2 Financial implications relating to the delivery of additional affordable housing supply
will also be detailed within the annual Housing Revenue and Capital Account Budget
update reported to Housing and Technical Resources Committee. 
14. Climate Change, Sustainability and Environmental Implications
14.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability.
15. Other Implications
15.1.  Provision of new affordable housing is one of the Council’s top risks and is included
on the Resource Risk Register. 
15.2. The new build specification for future projects will achieve higher energy standards
reflecting enhanced building regulations and will therefore make a positive
contribution to both the council’s sustainability, climate change and fuel poverty
reduction targets. 
15.3.  The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement.
94

Page 95

16. Equality Impact Assessment and Consultation Arrangements
16.1. The SHIP is a delivery plan for the council’s LHS which has been subject to an
equalities impact assessment. 
16.2. Consultation on the preparation of the SHIP has taken place with RSL partners,
other Council Resources and the Scottish Government. 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
20 September 2022 
Link(s) to Council Values/Priorities/Outcomes
♦ Focused on people and their need
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 People - Put people first and reduce inequality
 Progress – we need to recover, progress and improve
 Planet – we need to work towards a sustainable future in sustainable places
 Communities and environment – caring, connected, sustainable communities
 Housing and land – good quality, suitable and sustainable places to live
 Our economy – thriving business, fair jobs and vibrant town centres 
Previous References
 South Lanarkshire Local Housing Strategy 2017-2022 
 South Lanarkshire Rapid Rehousing Transition Plan 2019-24
 Strategic Housing Investment Plan 2022-2028 Housing and Technical Resources
Committee Report, Sept 2021 
List of Background Papers
♦ Scottish Government Guidance: Strategic Housing Investment Plan: Guidance Note
MHDGN 2022/01 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Rosie Hart, Development and Private Sector Co-ordinator
Ext:4588  (Phone: 01698 454588)
E-mail:  rosie.hart@southlanarkshire.gov.uk 
95

Page 96

Appendix 1: Summary of SLPA completions by SLC and RSLs within South Lanarkshire 2021/22
Site Provider General Particular Needs/Amenity Total
Auldkirk Road/Woodlands Crescent, Cambuslang SLC 42 6 48
Gilbertfield Road, Cambuslang SLC 45 12 57
Glengonnar Site, Larkhall SLC 16 4 20
Hamilton CGA Phase 1- Highstonehall Road Hamilton SLC 36 12 48
Hareton Place East Kilbride (EK CGA Pod 1D site A) SLC 0 24 24
Edinburgh Road, Biggar SLC 14 10 24
Law Primary School SLC 8 12 20
Roadmeetings, Carluke SLC 10 4 14
East Whitlawburn Regeneration Phase 2 SLC 34 0 34
Gas Works Uddingston SLC  10 10 20
Open Market Purchase SLC 53 0 53
Council Programme Sub Total  268 94 362
Percentage  74% 26% 100%     
Carlisle Road, Ferniegair Clyde Valley HA 9 18  27
Low Waters Road, Hamilton  Clyde Valley HA 4 8 12
Hoover Site, Cambuslang Clyde Valley HA 11 6 17
Bothwellbank Farm, Bothwell Clyde Valley HA 17 8 25
Redwood Crescent, East Kilbride East Kilbride HA 22 0 22
Bridge Street, Cambuslang Link HA 54 32 86
RSL Programme Sub Total   117 72 189
Percentage  62% 38%  100%
Council and RSL Combined Total   385 166 551
Percentage   70% 30% 100%
96

Page 97

Appendix 2: Home+ Programme Summary 
Table 1: Home+ Programme 
Site Area General
Needs
Particular
Needs/
Amenity
Total
Units
Year
completion
Baird Hill East Kilbride 14 14 28 2015/16
Belmont Drive East Kilbride 8 14 22 2016/17
Fernhill Road Rutherglen 36 34 70 2016/17
Old Mill Rd Uddingston 0 12 12 2017/18
Maxwellton Avenue East Kilbride 4 12 16 2017/18
Belstane Gate Carluke 22 0 22 2017/18
Almada Street  Hamilton 10 0 10 2018/19
South Vennel Lanark 0 18 18 2018/19
Morven Avenue Blantyre 14 0 14 2018/19
Highstonehall Road Hamilton 20 4 24 2018/19
Heathery Knowe East Kilbride 4 12 16 2018/19
St Blanes PS Blantyre 10 10 20 2018/19
East Milton East Kilbride 0 30 30 2018/19
Kirkton Street Carluke 0 18 18 2019/20
St Leonards East Kilbride  36 24 60 2020/21
East Whitlawburn Ph1 Rutherglen 56 28 84 2020/21
Hamilton CGA Ph1 -Highstonehall
Road 
Hamilton 36 12 48 2021/22
Hareton Place (EK CGA) East Kilbride 0 24 24 2021/22
Edinburgh Road,  Biggar 14 10 24 2021/22
Law Primary School Law 8 12 20 2021/22
East Whitlawburn Ph2 Rutherglen 34 0 34 2021/22
Auldkirk Road/Woodlands
Crescent, 
Cambuslang 42 6 48 2021/22
Gilbertfield Road,  Cambuslang 45 12 57 2021/22
Glengonnar Site,  Larkhall 16 4 20 2021/22
Roadmeetings,  Law  10 4 14 2021/22
Gas Works Uddingston  10 10 20 2021/22
Carlisle Road  Hamilton 12 0 12 2022/23
St Joseph’s PS Blantyre 19 26 45 2022/23
Benthall Farm, Shields Road East Kilbride 51 16 67 2022/23
Avon Road Larkhall 29 9 38 2022/23
East Whitlawburn, Ph3 Rutherglen 53 0 53 2022/23
Kirk Street Strathaven 12 8 20 2022/23
New build completions  Total 625 383 1008  
%    62% 38% 100%   
97

Page 98

Table 2: Open Market Purchase to March 2022 
Site Area General
Needs
Particular
Needs/
Amenity
Total
Units
Year
completion
Open Market
Purchase
All areas  12 1 13 2015/16
19 0 19 2016/17
31 1 32 2017/18
59 2 61 2018/19
60 0 60 2019/20
53 0 53 2020/21  
53 0 53 2021/22
Open market 
Purchase
Total  287 4 291 
%  98% 2% 100% 
98

Page 99

Housing and Technical Resources
Strategic Housing Investment Plan for South Lanarkshire 2023 – 2028
October 2022
11
99

Page 100

Index
Ref  Item 
1  Introduction
1.1  Purpose
1.2  Background
1.3  Impact of Covid-19, and construction price increases on the programme
1.4  SHIP 2023-2028 framework
1.5  Equalities
1.6  Strategic Environmental Assessment
2  Context
2.1  National strategic housing investment and delivery framework
2.1.1  Housing to 2040
2.1.2 Programme for Government 
2.1.3 Housing supply targets
2.1.4  Second Homes
2.1.5  Empty Homes
2.1.6  Climate change and sustainable housing development
2.1.7 Community Plan 2022-2032
2.2  Local strategic housing investment and delivery framework
2.2.1  South Lanarkshire Local Development Plan 2
2.2.2  Community growth areas land supply
2.2.3  Local Housing Strategy (LHS)
2.2.4  Housing Need Demand Assessment (HNDA)
3  Meeting housing need and improving quality of life
3.1  South Lanarkshire Council’s Home+ Programme
3.2  Registered Social Landlords (RSL) completions
3.3  Private Housing completions
3.4  Homelessness and Rapid Rehousing Transition Plan (RRTP) 2019 -2024
3.5  Wheelchair accessible housing targets
3.6  Gypsy/Travellers
3.7  Child Poverty 
3.8  Strategic Commissioning Plan 2022-2025
4  SHIP 2023-2028 delivery
4.1  SHIP tables and development priorities
4.2  Site prioritisation criteria
4.3  Financial resources
4.4  South Lanarkshire Council contributions
4.5  Private developer contributions
4.6  Organisational capacity
4.7  How to comment on the SHIP
100

Page 101

Table 1:  Development priorities Years 1 to 5 (2023-2028) 
Table 2:  Housing Infrastructure Fund (HIF) Projects
Table 3:  Potential HIF affordable housing projects which may be delivered following
HIF investment
Table 4:  Affordable housing projects funded or supported by sources other than
RPA/AHSP budget
Table 5.1:  Council Tax on second and empty homes
Table 5.2:  Private developer contributions
101

Page 102

1. Introduction 
1.1 Purpose 
The Strategic Housing Investment Plan (SHIP) is a five-year plan that sets out affordable
housing development priorities within a local authority area to guide the way in which
Scottish Government funding and other resources are allocated to achieve Local Housing
Strategy (LHS) outcomes. It is refreshed and submitted to the Scottish Government every
year. 
1.2  Background 
This SHIP covers the period 2023-2028 and builds on the progress that has been made
towards meeting the target of 50,000 additional supply of affordable homes across all
tenures which was set originally for March 2021, but which was extended to March 2022 to
reflect the impact of the global Covid-19 pandemic. The SHIP identifies potential sites
which will deliver strategic housing projects to deliver affordable housing across South
Lanarkshire.
The development of the SHIP 2023-2028 has been based on the Resource Planning
Assumptions noted in section ‘4.3 Financial Resources’ along with consideration of the
following mechanisms identified in the Scottish Government’s Infrastructure Investment
Plan for Scotland 2022-2023 to 2027-2028.  
• Over £3.3 billion is allocated to deliver more affordable and social homes, helping to
create great places, and continuing to ensure the right types of homes in the right
places to support Local Housing Strategies and regional development priorities
• Investing £275m to support community led regeneration and town centre revitalisation
as part of a new Place Based Investment Programme. 
• £525m investment in City Region and Regional Growth Deal programme to bring long
term approaches to improving regional economies, harness additional investment,
create new jobs, and accelerate inclusive and sustainable economic growth.
• A £250m capital investment in support of Place, community led regeneration, town
centres and 20-minute neighbourhoods. 
• £20m Gypsy/Traveller Accommodation Fund to provide more and better
accommodation for Gypsy/Traveller communities. 
Building on its housing supply programme, the Scottish Government aims to create
sustainable economic growth and address homelessness through existing and new
initiatives including increasing the supply of accessible affordable homes across all tenures
with appropriate community infrastructure. The SHIP is a key document for directing
resources to achieving the delivery of affordable housing.
1.3 Impact of Covid-19, and construction price increases on the programme 
The impact of the Covid-19 pandemic interrupted all sectors of society, affecting the
construction and housing sectors’ ability to reach the national target for 50,000 affordable
homes by March 2021. The target for completion of these homes was extended to 2021/22,
as noted in the Scottish Government’s long term housing strategy Housing to 2040
published in March 2021.
The council, local developing Registered Social Landlords (RSLs) and the Scottish
Government continue to work closely to ensure that the South Lanarkshire affordable
housing programme can be delivered as quickly and safely as possible. 
The Scottish Social Housing Tender Price Index measures the movement in construction
costs of social housing in Scotland.  The latest published quarterly briefing (June 2022)
indicates tender prices for social housing in Scotland are rising steadily. In Q4 21/22 they
were up 4.0% on the previous quarter and 8.3% on the same quarter a year earlier.
Underlying construction costs of labour, materials and plant contributed to these rises. The
102

Page 103

council will continue to monitor these costs for future projects to ensure the council
achieves best value for money. 
1.4  SHIP 2023-2028 framework
The SHIP has been produced by the Council’s Housing and Technical Resources in
collaboration with Planning colleagues from Community and Enterprise Resources, and
Health and Social Care Partnership (H&SCP), and in consultation with the Scottish
Government’s More Homes Team, developing Registered Social Landlords (RSLs) and
private developers. The plan has been developed to meet relevant Scottish Government
guidance and specific requirements set out in Guidance on Preparing Strategic Housing
Investment Plans – More Homes Division Guidance Notes 2022/01 (MHDGN).
The assumptions and forecasts set out in the appendix tables are based on information
available at the time of preparation and will be subject to refinement as projects are
developed. Strategic Local Programme Agreements (SLPAs) are reviewed and reissued
annually to maintain a minimum three year forward programme. This process takes account
of progress and allows new projects, drawn from the SHIP, to be included in the
programme if additional funding becomes available, or particular sites prove to be unviable. 
The Scottish Government monitors delivery of affordable housing via the Affordable
Housing Supply Programme (AHSP). The SHIP tables provide the basis for the
development of the three-year rolling SLPAs between the Council and Scottish
Government.   SLPAs in turn form the basis for RSL and Local Authority Programme
agreements and become the primary mechanism for delivery of the Affordable Housing
Supply Programme. 
1.5  Equalities
The SHIP is a delivery plan for the Local Housing Strategy (LHS).  An Equalities Impact
Assessment (EQIA) completed for the current LHS (2017-2022) found the strategy would
have a positive impact on the people of South Lanarkshire and there were no negative
impacts on protected characteristic groups as identified in the Equality Act 2010. As part of
South Lanarkshire Council’s approach to mainstreaming equalities, equalities principles
were considered throughout the development of the LHS and informed the associated
outcomes and priorities.  The key principles included:
• Accessing: providing services in ways that mean everyone can and does have the
right to use them
• Community: providing services that bring people together and make the most of
individual needs and abilities
• Informing: ensuring everyone has access to information in a format that suits their
needs
• Involving: talking to groups and individuals and using their views and opinions to
shape the strategy
• Promoting: ensuring individuals are treated fairly and given the opportunity to
participate fully no matter their individual need
• Understanding: raising awareness of diversity and ensuring people are treated with
dignity and respect 
The next LHS covering the period 2022-2027 is under development and scheduled for
publication in December 2022. As part of the development of this a full EQIA is being
prepared and will be completed. This will ensure the strategy and other key documents it
aligns with, including the SHIP, continue to positively impact on the people of South
Lanarkshire. 
103

Page 104

1.6 Strategic Environmental Assessment (SEA)
The Council undertook a pre-screening in accordance with the Environmental Assessment
(Scotland) Act, 2005, setting out its view that the SHIP will have no effect in relation to the
environment. The Council made this decision because the SHIP sits under the hierarchy of
the Council Plan, the Local Housing Strategy, and the Local Development Plan, all of which
have undergone a full SEA.
2. Context
National housing and related policies, including planning policies along with the wider UK
policies and their impact on local housing markets, provide the strategic context within
which the SHIP is developed. 
2.1 National strategic housing investment and delivery framework
2.1.1 Housing to 2040 
The Scottish Government’s long term housing strategy ‘Housing to 2040’ (2021), sets out a
vision and principles which focus upon the vital role which good housing and homes play in
supporting health, wellbeing, life chances and employment opportunities.
The visions and principles are set out in a route-map as follows:   
1. More homes in great places
2. Affordability and choice
3. Affordable warmth and zero emissions homes
4. Improving the quality of all homes (which includes taking action to support those with
long-term conditions and disabilities to live at home independently). 
A long-term ambition has been set by the Scottish Government to deliver an additional
110,000 affordable homes by 2032, with at least 70% of these to be for social rent. 
Of this figure 55,000 of these affordable homes are to be delivered by 2027.  A further
55,000 homes to be delivered by 2032 including accelerating investment funding towards
bringing existing homes into the programme, as well as building new homes.   The SHIP
sets out the capacity to deliver 2562 units in South Lanarkshire by 2028. 
A timeline of key actions has been set out by the Scottish Government to identify how each
aspect of the ‘Housing to 2040’ strategy will be delivered.  All relevant actions will be
considered throughout the identification, design and construction of the sites identified
within the SHIP 2023-2028 as appropriate.
2.1.2 Programme for Government 
In September 2021, the Scottish Government published its’ Programme for Government,
reiterating the aim to deliver 110,000 affordable homes across Scotland by 2032 which are
warm, safe and well connected.   Experience of the Covid-19 pandemic has also
highlighted the importance of considering the quality of the environment that people live in
and creating conditions that promote healthier lifestyles.
Investment Grant discussions concluded in October 2021 and revised benchmark figures
have been published.  These figures reflect increases in build costs since benchmark
figures were first set. Registered Social Landlords can claim for increased monies for
additional build standards such as net zero homes, home working stations etc.
The revised baseline benchmark was set for local authorities at £71,500 (3-person
equivalent), with the option to apply additional quality measure benchmarks where there
was an increase to the specification of properties to include items such as space for work or
study, fire suppression systems, zero emission heating systems amongst others, with could
increase the figure to £84,800.  
Local authorities across Scotland are now working to the revised benchmark levels. Locally
the council has based applications for grant funding under the new scheme on a financial
assessment to confirm that the development will not have an adverse impact on the
housing business plan or rent affordability for tenants.
104

Page 105

2.1.3 Housing supply targets 
The LHS five-year Housing Supply Targets (HST) for affordable and private housing are
based on Housing Estimates and other Core Outputs of the Glasgow and Clyde Valley
Housing Need and Demand Assessment (HNDA3) 2022.
A HNDA is designed to give broad, long-term estimates of the number of additional housing
units that may be required to meet existing and future housing need and demand. The
HNDA also includes information on the operation of housing systems to help local
authorities to develop policies for management of existing housing stock and the provision
of housing related services. The full HNDA3 can be found at www.clydeplan-sdpa.gov.uk.
HSTs are a policy-based interpretation of the HNDA outputs for the number of homes that
may be delivered in the local authority area. They take account of a range of factors, as set
out in Scottish Planning Policy and Scottish Government HNDA Guidance. As a
consequence, HSTs may be higher or lower than the housing estimates calculated in the
HNDA.
The proposed targets for South Lanarkshire are detailed in Table A below. These will be
confirmed following approval and publication of the LHS 2022-2027.  
Table A: Proposed 2022-2027 housing supply targets
Tenure Per year Total
Affordable 250-300 1,250-1,500
Market (private) 700-750 3,500-3,750
All 950-1050 4,750-5,250
2.1.4 Second Homes
Making better use of existing housing stock in all tenures is a key element of the overall
strategy for meeting growing levels of housing need. Since 2005, local authorities have
been granted discretionary powers to vary Council Tax discounts on long term empty and
unfurnished dwellings.  Additionally, income generated from the application of council tax to
“second homes” is also used to support the provision of new-build affordable housing for
rent to meet locally determined priorities. 
Table 5.1 of the SHIP sets out the resources generated through Council Tax and reused to
support affordable housing delivery across the South Lanarkshire Council programme. 
2.1.5 Empty Homes
Since 2013, local authorities have been granted additional discretionary Council Tax
variation powers on long term empty properties to help bring properties back into use.  A
local authority may set a council tax increase of 100% on certain properties which have
been empty for one year or more.  South Lanarkshire Council has applied a 100% levy on
empty homes since 1 April 2019 and raised £496,000 in revenue from the levy during the
financial year 2020/21. 
Recognising the importance of bringing empty homes back into use and the contribution
this can make towards meeting housing need, during 2021 South Lanarkshire Council has
a Strategy and Policy Officer (Empty Homes) to assist property owners in bringing their
properties back into use. Referrals for this service are made internally and by the public
who can report an empty property using an online form available on the council’s website.
As of 31 July 2022, there is an active caseload of 104 properties which are currently being
pursued.
The council has set a target in the LHS of bringing 15 empty properties per year back into
use. Assistance is provided to empty homes owners in the form of information, advice, and
support in how to deal with the issues presented by empty homes, and the benefits to
105

Page 106

owners in occupying, renting out, or selling their empty properties. An internal working
group meets regularly, attended by officers from Building Standards, Environmental
Services, Council Tax, HomeImprove Service and Legal Services to address issues
presented by empty homes and to develop a partnership approach in bringing properties
back into use. 
2.1.6 Climate change and sustainable housing development
A key objective in the delivery of the affordable housing supply programme is to ensure that
the design principles achieve the standards required to help reduce the greenhouse gas
emissions as per Scottish Government’s higher Energy Efficiency Standards for Social
Housing post 2020, (EESSH2).   
Through the LHS, the council and RSL partners will work to increase the proportion of their
housing stock meeting the equivalent of EPC Band B or above and explore opportunities to
trial new technology to assist in meeting this standard. The national Heat in Buildings
Strategy (2021) also guides building owners and users, outlining steps to reduce
greenhouse gas emissions from homes, workplaces, and community buildings, aiming to
ensure poor energy performance does not lead to fuel poverty.   
South Lanarkshire Council’s Sustainable Development and Climate Change Strategy 2022-
2027 focuses on the themes of People, Place and Communities, the Natural Environment,
and a Green Economy.  The LHS makes a significant contribution to the Place &
Communities theme, through work to improve the condition and energy efficiency
performance of all housing, as well as minimising the impact of fuel poverty. 
To this effect, all South Lanarkshire Council new-build homes are built to the Silver Greener
Standard as set out in Section 7, Silver Level, of the 2011 Building Regulations in respect
of both Carbon Dioxide emissions and Energy for Space Heating.    A higher grant subsidy
is available from the Scottish Government to help meet the cost of achieving this Standard. 
In addition, modern construction methods are utilised as far as possible to help minimise
adverse environmental impacts. 
Building new homes to these standards also contributes to the council’s wider contribution
to the national Energy Efficient Scotland programme which seeks to raise the energy
efficiency ratings of domestic properties across Scotland to the following Energy
Performance Certificate (EPC) bandings: 
• Eligible social rented properties should achieve EPC Band B by 2032
• Eligible private rented properties should achieve EPC Band E by 2022*, Band D by
2025, Band C by 2030
• Eligible owner-occupied properties should achieve EPC Band C by 2040
*As a result of the Covid-19 pandemic, the requirement for achieving EPC Band E for
private rented properties was delayed. Further details on this are expected to be published
by the Scottish Government at a later date.  
2.1.7 Community Plan 2022-2032 
The Community Plan brings together local and national public, private and community
sector representatives to work together. The aim is to improve the lives and prospects of
everyone in South Lanarkshire. 
In the context of housing the plan focuses on providing good quality, suitable housing for
everyone. Priority areas of action identified in the plan are as follows:
• We will increase affordable housing supply and improve access to and choice of
housing options that suit people's needs
• We will work in partnership to improve housing quality and energy efficiency, whilst
supporting a just transition to decarbonisation
106

Page 107

• We will work in partnership to prevent and signficantly reduce homelessness, and im-
prove outcomes for those at risk of or who experience homelessness 
2.2 Local Strategic Housing Investment and Delivery Framework
2.2.1 South Lanarkshire Local Development Plan 2
The Local Development Plan 2 (LDP2) was adopted in April 2021 and sets out the spatial
framework for new housing development across South Lanarkshire. Local Development
Plan 2 (LDP2) builds on the previous LDP aligning with the Scottish Planning Policy and
Clydeplan Strategic Development Plan 2 (SDP2) in relation to ensuring a five-year effective
housing land supply at all times for both private and public sectors. 
LDP2 contains a section on housing which considers aspects of private and public sector
housing, and this is translated into policies dealing with housing land supply and affordable
housing. These policies are aimed at ensuring a five-year supply of appropriate housing to
meet a range of needs and demands. Key priorities include the continuation of the
Council’s development of the Community Growth Areas linked to the City Deal project and
the Council’s new house building programme. 
2.2.2 Community growth areas land supply
South Lanarkshire has identified five community growth areas (CGAs) which will assist in
meeting future housing need and demand arising from projected household growth. These
areas are also key strategic projects for major infrastructure investment to be delivered
through the City Deal. ‘Table B’ below sets out the remaining supply and capacity position,
based on the draft 2022 Housing Land Audit.
Table B: Community Growth Areas (CGAs)
Community
Growth Area
No of
Sites
Capacity for
development
2022-2027
Capacity for
development
post 2027
Total
capacity
across CGA
Carluke 4 51 550 601
East Kilbride 31 1694 423 2117
Ferniegair/Larkhall 6 162 1100 1262
Hamilton 14 740 766 1506
Newton 6 266 348 614
Total 61 2913 3187 6100
The estimated CGA outputs reflect up-to-date assessment of current and future conditions
and performance within the local housing market and the economy. Phases are under
construction at all the CGA’s across South Lanarkshire.
The SHIP has identified potential affordable housing opportunities across CGA sites over
the five year period.  Delivery will be determined by the rate of development linked to
improvements in the housing market as well as capacity within the affordable housing
budget at such times as sites become available. The Council continues to work with key
partners involved in the CGAs to consider options for securing delivery of new affordable
housing taking account of changes in funding.
2.2.3 Local Housing Strategy 
South Lanarkshire’s next Local Housing Strategy covers the five-year period from 2022 to
2027 and is subject to annual review. Closely linking to other council and partner strategies
and plans, the LHS also now aligns with priorities of people, progress and planet contained
within the South Lanarkshire Community Plan. 
Following the structure of the LHS 2017-2022, the draft strategy contains eight outcomes to
improve the access to, and quality of, affordable housing in South Lanarkshire:
107

Page 108

1. Increase overall housing supply and improve access to and choice of housing
options that suit people’s needs which they can afford and sustain
2. Private landlords and tenants are supported to ensure renting remains a
sustainable housing option that meets all required standards
3. Housing quality and energy efficiency are improved, with advice and support
provided to building owners and tenants to help them achieve the required
standards
4. More homes are heated through decarbonised sources and renewable energy
supply opportunities are explored
5. People with particular needs are better supported to live independently within the
community in a suitable, sustainable home
6. Prevent homelessness occurring and significantly reduce homelessness
7. People who experience homelessness are provided with suitable temporary
accommodation as required and are supported to move to settled accommodation
that meets their needs as quickly as possible
8. Housing sustainability is improved in priority areas and settlements and people are
encouraged to be part of their local community
2.2.4 Housing Need and Demand Assessment (HNDA)
HNDA3 sets out a broad, long-term estimate of the number of additional housing units that
may be required to meet the existing and future housing need and demand between 2022
and 2040. The HNDA takes account of projected population change including an ageing
population, changing household composition patterns, and inward migration and estimates
a need for an additional 9,258 to 10,650 dwellings across South Lanarkshire by 2040. 
Housing Supply Targets within the LHS (as outlined at 2.1.3) consider HNDA3 analysis
which continues to show the need for affordable housing to meet need across all four
Housing Market Areas in South Lanarkshire.
3.  Meeting housing need and improving quality of life
Aligning to the relevant national and local housing strategies and policies, the key focus
when allocating affordable social rented housing is to respond to local needs and demands
by ensuring that:
• those assessed as being in most need are prioritised for housing
• best use is made of available housing stock within South Lanarkshire
• the allocation of housing contributes towards the achievement of balanced and
sustainable communities 
The majority (91%) of South Lanarkshire’s social rented stock is accessible through
HomeFinder, the South Lanarkshire common housing register, where the Council and
participating RSL partners have agreed a single application process and common
assessment of housing need.
3.1 South Lanarkshire Council’s Home+ Programme
The Home+ Programme set a target to deliver 1,000 additional new houses for the council.
This target is to be achieved during 2022/23. 38% of the Council’s new build supply
addresses the needs of older people and those with particular needs. This meets the
requirements identified in the current LHS and is consistent with the population and
household projections of an ageing population in South Lanarkshire. 
The council’s new build supply aims to meet the Housing for Varying Needs (HfVN)
standards featuring barrier free internal spaces, energy efficient and high-quality standards. 
The general needs category comprises a range of property types, including terraced and
semi- detached homes designed to achieve a degree of flexibility to suit people of different
abilities and needs. Their specification includes a wider staircase allowing for the
108

Page 109

installation of a chairlift, downstairs toilet and walk in shower or space provided for future
installation of a shower for ambulant disabled household members as needs arise. Larger
sized semi-detached properties (four bedrooms or more) feature a downstairs bedroom/s
and bathroom aimed at addressing the needs of households with a disabled family
member. 
The particular needs/amenity category comprise semi-detached bungalows, cottage flats
and lift access flats for older and ambulant disabled people. Wheelchair user homes have
been specifically adapted to suit the particular needs of a household and are designed to
HfVN wheelchair user basic standards, including additional desired features where
required.
3.2 Registered Social Landlords (RSL) completions
RSL partners participating in the affordable housing supply programme have made a
significant contribution towards meeting a wide range of housing needs and to the Scottish
Government’s affordable housing target. RSLs have delivered a total of 1,247 social rented
homes 
3.3 Private Housing completions 
Private housing developments have progressed at a good pace, with a total of 3256
completions during the three-year period from 2020, with 937 of these in the community
growth areas (based on draft 2022 figures).
3.4 Homelessness and Rapid Rehousing Transition Plan (RRTP) 2019-2024
Addressing homelessness is a key priority of the LHS and the South Lanarkshire affordable
housing supply programme. The RRTP, co-produced with a wide range of partners sets out
a strategic approach to addressing homelessness, outlined in five high priority objectives
and articulated in the associated actions.
1. Preventing homelessness occurring and significantly reduce homelessness
2. Significantly reduce time spend by households in temporary accommodation and
minimise moves before moving to a settled home
3. Improve and increase the provision of housing support for households to live
independently within communities
4. Expand the scope and capacity of our Housing First approach to be the first
response for households with multiple complex needs
5. Enhance integration of partnership working and imbed RRTP through a whole
systems approach
The Open Market Purchase Scheme targets specific properties to support actions relating
to the RRTP, including replacing housing stock where a temporary tenancy is converted or
‘flipped’ to a permanent home. In addition, a significant proportion of affordable social
rented homes are allocated to homeless households to support targets set out within the
RRTP.  The level of lets allocated to homeless households as a result of the affordable
housing supply programme is monitored and reported.
The third annual review of the RRTP was approved by Housing and Technical Resources
Committee in June 2022. The review confirmed that good progress had been made against
the action plan to date. 
3.5 Wheelchair accessible housing targets
Scottish Government guidance MHDN 2019/02 recommends setting wheelchair housing
targets within the LHS to support the delivery of more wheelchair accessible housing. This
is a key housing action in ‘A Fairer Scotland for Disabled People’ delivery plan. 
Adaptations to existing and new supply of social housing contribute to increasing the supply
of fully wheelchair accessible homes, though these are a small percentage of all housing
supply. An important priority for the LHS is for housing and health and social care partners
to work together with stakeholders to identify the extent of need for additional wheelchair
109

Page 110

accessible housing in South Lanarkshire and look to opportunities through the Strategic
Housing Investment Plan and via the Affordable Housing and Housing Choice
Supplementary Planning Guidance, to increase fully wheelchair accessible housing supply. 
As per the LHS Guidance (2019) a target for the proportion of new-build properties across
all housing tenures was set at 8%. This will be kept under review as part of the LHS annual
review process, analysis of demand and discussions with partners and developers.
3.6 Gypsy/Travellers 
South Lanarkshire Council owns and manages two Gypsy/Traveller sites with 18 pitches at
Shawlands Crescent in Larkhall, and 6 pitches at Springbank Park, East Kilbride operating
at full occupancy.
It is proposed the LHS 2022-2027 will build on the significant progress made during the last
LHS through actions to assess accommodation need and demand of Gypsy/Travellers in
South Lanarkshire, as well as continue to implement improvement projects from the two
masterplans, developed in conjunction with current site residents. 
3.7 Child poverty
The fourth South Lanarkshire Local Child Poverty Action Report (LCPAR) was approved by
the Community Planning Partnership Board in September 2022 and continues to focus on
tackling the three main drivers of child poverty: income from employment; costs of living;
income from social security and benefits in kind.
Within the ‘reducing the cost of living’ section of the report, there are a range of actions
relating to the supply of good quality, affordable housing, including: 
• Reducing the costs of housing for families including energy costs;
• Investment to increase new affordable housing supply;
• Preventing and reducing homelessness for households, including families with
children and young people.
In terms of new affordable housing, a key objective of the design principles is to help
reduce the cost of living. A primary factor is location, ensuring housing developments are
close to amenities helping to minimise transport costs as most facilities will be within
walking distance. By building all new council homes to the Silver Greener Standard, tenants
will also benefit from reduced energy costs. 
3.8 Strategic Commissioning Plan 2022-2025
The Public Bodies (Joint Working) (Scotland) Act 2014 established requirements for the
integration of health and social care services for adults across Scotland. The local
Integration Authority, ‘South Lanarkshire Health and Social Care Partnership’ assumed
responsibility for delegated functions on 1 April 2016 and has published its third Strategic
Commissioning Plan (2022-25). 
Key themes of the Strategic Commissioning Plan include promoting sustainable and
housing and contributing to homelessness prevention and reduction.  The Local Housing
Strategy (LHS) is very closely aligned to the plan with a specific Housing Contribution
Statement setting out how partners and services will help people to remain healthy and well
and support them to live independently within their own homes. The Strategic
Commissioning Plan and the LHS also work together to contribute to wider social and
economic community planning priorities and goals, including tackling inequalities and
supporting more vulnerable people to achieve better outcomes and quality of life. 
110

Page 111

4. SHIP 2023-2028 delivery
4.1 SHIP tables and development priorities 
The tables set out 72 sites with an estimated total capacity for the delivery of up to 2562
additional affordable homes over the five-year period to March 2028.  These include priority
projects rolled forward from the previously approved SHIP, projects with current SLPA
funding commitments and new sites. The programme has been developed in consultation
with key developer partners and reflects key national and local strategic issues of material
consideration including negotiations with private developers in relation to specific
development proposals
A breakdown of the proposed distribution of the new build affordable housing units across
the four housing market areas is set out below.
Table C: combined five-year affordable housing units by Housing Market Area
Clydesdale Hamilton East
Kilbride
Rutherglen/
Cambuslang
OMP
(various
areas)
South
Lanarkshire
332 810 807 313 300 2562
14% 36% 36% 14% n/a 100% 
4.2 Site prioritisation criteria
New sites are prioritised for inclusion in the SHIP based on a number of key factors and
associated strategic issues of material consideration.  All sites are assessed based on the
agreed criteria and depending on the outcome, they are categorised, as high, medium or
low priority. An outline of the assessment approach agreed with relevant developer partners
is set out in Table D.
Table D: Site assessment approach
Key factors Material Considerations
Site location LDP2 housing land sites/windfall sites regeneration/ proximity to
other sites under development and services
Tenure mix LHS priority tenure: social rented/mid-market/shared equity/
localised housing pressure analysis to inform demand/house
types
Needs
category
General needs/older people/ wheelchair user/ homeless
households/Gypsy/Travellers
Sustainable
development
brownfield/greenfield/conservation/flood zone EESSH2
specification/digital inclusion
Development
constraints
Ownership/abnormals/access/ infrastructure deliverability in
relation to timescales
Development sites have to score positively on all key factors to be included in the SHIP. 
Priority categories of high, medium and low are assigned depending on whether the
development proposal contributes to outcomes as identified at national and local levels. 
Key strategic issues considered at site prioritisation stage are highlighted in the Material
considerations column of Table D above based on the best information available at the time
of preparing the SHIP. This enables investment to be targeted to priority developments
which will best meet local needs and identified LHS outcomes within the SLPA timeframe in
the event that the investment is constrained to the minimum RPA. The final output will be
111

Page 112

subject to a detailed development assessment on the viability of each site as well as the
level of grant funding resources available over the plan period. 
Subject to funding availability and unforeseen abnormal site constraints, the plan is realistic
in terms of estimated site start dates.
Mid-market rent, shared equity and low cost home ownership may form part of an overall
procurement package for each development to facilitate cost effective delivery of affordable
housing for rent.  To achieve this, the Council will continue to work closely with the Scottish
Government and our partners in the public and private sector to develop alternative funding
sources and delivery mechanisms and maximise implementation of this SHIP particularly in
the major Community Growth Areas.
4.3 Financial resources
The principal sources of funding for the Council’s Home+ Programme come from
contributions made by the Housing Revenue Account (HRA) through Prudential Borrowing,
the Scottish Government’s Affordable Housing Supply Programme (AHSP), Private
Developer Contributions and the Council Tax levy on second and empty homes. AHSP is
available for various types of affordable housing including social rent comprising new build
and open market purchases, mid-market rents and Low-cost Initiative for First Time buyers
(LIFT) shared equity schemes delivered by the Council or RSLs and in some cases, in
partnership with private developers. 
The Scottish Government has published Resource Planning Assumptions for councils
across Scotland covering the five year period from 2021/22 to 2025/26. The total published
RPA issued to South Lanarkshire for this period is £156.084.
The SHIP has been prepared taking account of the estimated RPA of £152.3m for planning
purposes, for the future period from April 2023 to March 2028. In accordance with the
guidance, for planning purposes, councils are asked to over-programme by a factor of 25%
per year to allow for slippage in the programme. 
Table E below summarises the RPA projected between 2023 to 2028: 
Table E: South Lanarkshire’s Resource Planning Assumptions (RPA) 
Financial Year Scottish Government RPA
(£0.0m) 
SHIP Planning Assumptions RPA +
future year capacity (£0.0m)
2023/24 £30.074 £37.592
2024/25  £30.180 £37.725
2025/26 £30.680 £38.350
2026/27 £30.680** £38.350
2027/28 £30.680** £38.350
Total £152.30 £190.37
* RPA + 25% slippage factor applied 
** Projections subject to confirmation of funding for future years. 
4.4  South Lanarkshire Council contributions 
The Council’s key funding sources include:
• Prudential borrowing by the HRA of over £26.452 million was approved in 2022/23
budget 
• Council Tax on second homes and empty homes generated £496,000 in 2021/22 
112

Page 113

4.5 Private developer contributions
To comply with the SLC Affordable Housing Policy private developers are required to
contribute 25% of all sites (with capacity of 20 units or more) available for affordable
housing.  The Council’s Local Development Plan Policy 13 ‘Affordable Housing and
Housing Choice’ and the associated Supplementary Guidance for Affordable Housing and
Community Infrastructure Assessment are used to inform local negotiations on developer
contributions to meet affordable housing requirements. 
SHIP Table 5.2 sets out developer contribution commuted sum payments received to date,
that will be used to support the delivery of the SHIP over the five-year programme.
4.6 Organisational capacity
South Lanarkshire has a good track record of innovative joint working and delivery and will
continue to work collaboratively with the Scottish Government, RSLs and private sector
partners, making best use of available resources to increase the supply of affordable
housing and contribute to meeting priorities set out within this SHIP.
4.7 How to comment on the SHIP
For more information or if you want this information in a different format or language, please
phone SratSupAdm@southlanarkshire.gov.uk 
If you need this information in another language or format, please contact us to discuss how
we can best meet your needs. Phone 0303 123 1015 or email
equalities@southlanarkshire.gov.uk
113

Page 114

Table 1 – SHIP 2023-2028
No Project Housing Market Area Developer Post code Priority
Social rent
Other
affordable
tenures Total
Units
Greener
Standard
Estimated
approval
date
Year 1
23/24
(£m)
Year 2
24/25
(£m)
Year 3
25/26
(£m)
Year 4
26/27
(£m)
Year 5
27/28
(£m)
Total
(£m)GN SN IMR NSSE
1 Stroud Road, East Kilbride East Kilbride Cairn HA Ltd G75 0HQ Medium 32 0 0 0 32 Yes 06/09/2023 0.000 2.976 0.000 0.000 0.000 2.976
2 Hoover Site Phase 2 Cambuslang/Rutherglen Clyde Valley HA Ltd G72 7 EB Medium 15 2 0 0 17 Yes 01/04/2024 0.000 1.326 0.000 0.000 0.000 1.326
3 Braxfield Road/Hyndford
Road, Lanark Clydesdale Clyde Valley HA Ltd ML11 9AB High 15 24 0 0 39 Yes 03/05/2022 0.000 0.000 0.000 0.000 0.000 0.000
4 Woodend Road, Carluke Clydesdale Clyde Valley HA Ltd ML8 4EF Medium 12 12 0 0 24 Yes 01/04/2022 0.000 1.000 1.000 0.000 0.000 2.000
5 Vogue Cinema, Lanark Clydesdale Clyde Valley HA Ltd ML11 7JS Low 6 3 0 0 9 Yes 01/08/2023 0.000 0.500 0.500 0.000 0.000 1.000
6 Mavor Avenue Phase 4, East
Kilbride East Kilbride Clyde Valley HA Ltd G74 4XT Medium 12 12 0 0 24 Yes 01/04/2024 0.000 1.872 0.000 0.000 0.000 1.872
7 Thornton Farm, East Kilbride East Kilbride Clyde Valley HA Ltd G74 5AL Low 19 2 0 0 21 Yes 01/05/2023 0.000 1.638 0.000 0.000 0.000 1.638
8 Alness Street Hamilton Clyde Valley HA Ltd ML3 6RS Low 14 12 0 0 26 Yes 01/04/2026 0.000 0.000 1.000 1.028 1.000 3.028
9 Bothwell Road Hamilton Hamilton Clyde Valley HA Ltd ML3 0AS Medium 20 20 0 0 40 Yes 01/04/2023 0.500 1.000 1.000 0.000 0.000 2.500
10 Cadzow Gait Phase 5 Hamilton Clyde Valley HA Ltd ML3 7GX Medium 8 8 0 0 16 Yes 01/04/2024 0.000 1.248 0.000 0.000 0.000 1.248
11 Hamilton Vogue, Keith Street,
Hamilton Hamilton Clyde Valley HA Ltd ML3 7BL High 6 12 0 0 18 Yes 01/04/2023 1.868 0.000 0.000 0.000 0.000 1.868
12 Torhead Farm Hamilton Clyde Valley HA Ltd ML3 8SZ Low 55 2 0 0 57 Yes 01/03/2027 0.000 0.000 0.000 2.000 2.446 4.446
13 Market Road, Biggar Clydesdale Clydesdale HA ML12 6FX High 16 4 0 0 20 Yes 05/06/2023 1.250 0.000 0.000 0.000 0.000 1.250
14 Alberta Avenue East Kilbride East Kilbride HA G75 8NH Medium 20 10 0 0 30 Yes 17/08/2022 0.000 0.500 2.200 0.000 0.000 2.700
15 Bosfield Corner East Kilbride East Kilbride HA G74 4AZ High 0 18 0 0 18 Yes 18/08/2022 0.000 0.300 1.140 0.000 0.000 1.440
16 Carnegie Hill East Kilbride East Kilbride HA G75 0AE Low 0 16 0 0 16 Yes 01/04/2025 0.000 0.000 0.000 0.000 1.000 1.000
17 Hunter Primary School,
Cornfoot Crescent East Kilbride East Kilbride HA G74 3YB Low 36 4 0 0 40 Yes 31/03/2024 0.000 0.000 0.000 0.750 0.000 0.750
18 Auldhouse Road, Langlands East Kilbride East Kilbride HA G75 0SG Medium 26 4 0 0 30 Yes 01/04/2023 0.600 1.800 1.800 0.000 0.000 4.200
19 Jackton Road East Kilbride East Kilbride HA G75 8RW Low 18 6 0 0 24 yes 29/03/2025 0.000 0.000 0.000 2.800 1.000 3.800
20 Goremire Road, Carluke Clydesdale Link Group ML8 4PF High 74 7 0 0 81 Yes 01/12/2022 9.000 2.714 0.000 0.000 0.000 11.714
21 Auldhouse Road, Langlands East Kilbride Link Group G75 0SG Medium 198 22 0 0 220 Yes 01/04/2023 11.240 7.480 0.000 0.000 0.000 18.720
22 Dunkeld Place, Hamilton Hamilton Link Group ML3 9PY Medium 22 2 0 0 24 Yes 01/03/2025 0.000 0.200 3.706 0.000 0.000 3.906
23 Grier Place, Larkhall Hamilton Link Group ML9 1AN High 44 4 0 0 48 Yes 01/05/2023 4.900 2.277 0.000 0.000 0.000 7.177
24 Wellhall Road, Hamilton Hamilton Link Group ML3 9TA High 52 7 0 0 59 Yes 30/06/2023 2.786 2.500 0.000 0.000 0.000 5.286
25 Braidwood House, Braidwood
Road, Carluke Clydesdale RSL ML8 5NU Low 30 0 0 0 30 Yes 01/02/2023 0.000 0.000 1.500 2.500 3.000 7.000
26 Avon Street, Larkhall Hamilton RSL ML9 1AT Low 23 2 0 0 25 Yes 01/04/2026 0.000 0.000 0.000 2.120 0.000 2.120
27 New Road, Halfway Cambuslang/Rutherglen Rutherglen/
Cambuslang HA Ltd G72 7PU High 35 8 0 0 43 Yes 31/01/2023 4.800 0.000 0.000 0.000 0.000 4.800
28
Former Greenhills Sports
Centre, Stroud Road, East
Kilbride
East Kilbride Sanctuary Scotland
HA G75 0YA High 25 3 0 0 28 Yes 01/04/2021 0.000 0.000 0.000 0.000 0.000 0.000
29 Bouverie Street, Rutherglen Cambuslang/Rutherglen SLC/RSL G73 3RX Medium 46 4 0 0 50 Yes 01/04/2024 0.000 4.240 0.000 0.000 0.000 4.240
30 Sheildaig Drive, Rutherglen Cambuslang/Rutherglen SLC/RSL G73 4DN Low 22 3 0 0 25 Yes 01/04/2026 0.000 0.000 0.000 2.120 0.000 2.120
31 Douglas Street, Hamilton Hamilton SLC/RSL ML3 0PB High 9 12 0 0 21 Yes 01/04/2023 1.781 0.000 0.000 0.000 0.000 1.781
32 Millheugh Brae Glengowan
Larkhall Hamilton SLC/RSL Medium 25 8 0 0 33 Yes 01/04/2025 0.000 0.000 1.399 1.399 0.000 2.798
33 Cairnswell Avenue, Cairns
Ph 3 Cambuslang/Rutherglen South Lanarkshire
Council G72 8SA High 34 10 0 0 44 Yes 30/12/2022 1.867 1.867 0.000 0.000 0.000 3.734
34 Central Site,Cambuslang Cambuslang/Rutherglen South Lanarkshire
Council G72 Low 10 2 0 0 12 Yes 01/05/2025 0.000 0.000 1.018 0.000 0.000 1.018
35 Central Site, Rutherglen Cambuslang/Rutherglen South Lanarkshire
Council G72 Low 10 2 0 0 12 Yes 01/05/2026 0.000 0.000 0.000 1.018 0.000 1.018
36 Fernbrae Avenue/Ryan Way,
Rutherglen Cambuslang/Rutherglen South Lanarkshire
Council G73 4AH Low 12 0 0 0 12 Yes 01/04/2025 0.000 0.000 1.018 0.000 0.000 1.018
37
Former Speyside Distillery
Site, Duchess Road,
Rutherglen
Cambuslang/Rutherglen South Lanarkshire
Council G73 1AU Medium 26 20 0 0 46 Yes 01/04/2025 0.000 0.000 3.901 0.000 0.000 3.901
38 Delves Road, Lanark Clydesdale South Lanarkshire
Council ML11 9DU Low 0 12 0 0 12 Yes 01/04/2024 0.000 0.000 0.000 1.018 0.000 1.018
114

Page 115

No Project Housing Market Area Developer Post code Priority
Social rent
Other
affordable
tenures Total
Units
Greener
Standard
Estimated
approval
date
Year 1
23/24
(£m)
Year 2
24/25
(£m)
Year 3
25/26
(£m)
Year 4
26/27
(£m)
Year 5
27/28
(£m)
Total
(£m)GN SN IMR NSSE
39 Thornton Farm, East Kilbride East Kilbride South Lanarkshire
Council G74 5BD Low 20 4 0 0 24 Yes 01/04/2026 0.000 0.000 0.000 2.035 0.000 2.035
40 Central East Kilbride site East Kilbride South Lanarkshire
Council G74 1AB Low 10 2 0 0 12 Yes 01/04/2024 0.000 0.000 0.708 1.018 0.000 1.726
41 Eaglesham Road, East
Klibride East Kilbride South Lanarkshire
Council G75 8RW High 36 6 0 0 42 Yes 31/08/2023 0.000 3.562 0.000 0.000 0.000 3.562
42 East Overton Farm,
Strathaven East Kilbride South Lanarkshire
Council ML10 6SZ Medium 22 2 0 0 24 Yes 03/04/2023 0.000 2.035 0.000 0.000 0.000 2.035
43 EK CGA (Site B - Jacktonhall) East Kilbride South Lanarkshire
Council G75 8RW High 36 4 0 0 40 Yes 31/08/2023 0.000 3.392 0.000 0.000 0.000 3.392
44 EK CGA (site C)  East Kilbride South Lanarkshire
Council G75 8RR Low 24 20 0 0 44 Yes 28/04/2025 0.000 0.000 3.731 0.000 0.000 3.731
45 EK CGA (Site D) East Kilbride South Lanarkshire
Council G75 8RW Low 33 3 0 0 36 Yes 31/03/2024 0.000 0.000 3.053 0.000 0.000 3.053
46 EK CGA (Site E) East Kilbride South Lanarkshire
Council G75 8RW High 45 11 0 0 56 Yes 31/03/2023 0.000 4.749 0.000 0.000 0.000 4.749
47 EK CGA (site F - Newsland
Road) East Kilbride South Lanarkshire
Council G75 8RR High 34 12 0 0 46 Yes 01/04/2023 0.000 3.901 0.000 0.000 0.000 3.901
48 Avon Road, Larkhall Hamilton South Lanarkshire
Council ML9 1EL High 32 6 0 0 38 Yes 15/08/2022 0.000 0.000 0.000 0.000 0.000 0.000
49 Brackenhill Farm, Hamilton Hamilton South Lanarkshire
Council ML3 8LU High 47 2 0 0 49 Yes 23/02/2023 4.155 0.000 0.000 0.000 0.000 4.155
50 Carlisle Road (Former ELU) Hamilton South Lanarkshire
Council ML3 7BZ Medium 0 20 0 0 20 Yes 31/03/2024 0.000 0.841 0.841 0.000 0.000 1.682
51 Central Site Hamilton Hamilton South Lanarkshire
Council ML3 0AA Medium 10 2 0 0 12 Yes 31/03/2024 0.000 1.017 0.000 0.000 0.000 1.017
52 Former Philips Factory,
Wellhall Road, Hamilton Hamilton South Lanarkshire
Council ML3 8PA High 34 6 0 0 40 Yes 15/09/2022 1.976 0.000 0.000 0.000 0.000 1.976
53 Brackenhill Farm Hamilton
CGA site Hamilton South Lanarkshire
Council ML3 8LU Medium 46 4 0 0 50 Yes 30/09/2023 2.120 2.120 0.000 0.000 0.000 4.240
54 Hamilton Green, Hamilton Hamilton South Lanarkshire
Council ML3 0JB High 57 32 0 0 89 Yes 30/11/2022 0.000 3.774 3.773 0.000 0.000 7.547
55 Larkhall Academy Site Hamilton South Lanarkshire
Council ML9 1QN High 54 0 0 0 54 Yes 01/04/2023 2.290 2.290 0.000 0.000 0.000 4.580
56 Larkhall CGA Hamilton South Lanarkshire
Council ML9 2UH Medium 18 2 0 0 20 Yes 31/03/2024 0.000 1.670 0.000 0.000 0.000 1.670
57 Main Street Blantyre Hamilton South Lanarkshire
Council G72 0EZ High 10 2 0 0 12 Yes 01/08/2023 1.017 0.000 0.000 0.000 0.000 1.017
58 Mill Road, Hamilton Hamilton South Lanarkshire
Council ML3 8AA High 6 0 0 0 6 Yes 30/11/2022 0.509 0.000 0.000 0.000 0.000 0.509
59 Morris Street Hamilton Hamilton South Lanarkshire
Council ML3 6SJ High 0 6 0 0 6 Yes 30/11/2022 0.509 0.000 0.000 0.000 0.000 0.509
60 Raploch Street, Larkhall Hamilton South Lanarkshire
Council ML9 1AJ High 13 2 0 0 15 Yes 01/08/2023 1.272 0.000 0.000 0.000 0.000 1.272
61 Shawlands Crescent, Larkhall Hamilton South Lanarkshire
Council ML9 2PH Low 2 0 0 0 2 Yes 31/03/2026 0.000 0.000 0.000 0.169 0.000 0.169
62 Open Market Purchase
(2023/24) South Lanarkshire South Lanarkshire
Council ML3 0AA High 60 0 0 0 60 No 01/04/2023 2.100 0.000 0.000 0.000 0.000 2.100
63 Open Market Purchase
(2024/25) South Lanarkshire South Lanarkshire
Council ML3 0AA High 60 0 0 0 60 No 01/04/2024 0.000 2.100 0.000 0.000 0.000 2.100
64 Open Market Purchase
(2025/26) South Lanarkshire South Lanarkshire
Council ML3 0AA High 60 0 0 0 60 No 01/04/2025 0.000 0.000 2.100 0.000 0.000 2.100
65 Open Market Purchase
(2026/27) South Lanarkshire South Lanarkshire
Council ML3 0AA Medium 60 0 0 0 60 No 01/04/2026 0.000 0.000 0.000 2.100 0.000 2.100
66 Open Market Purchase
(2027/2028) South Lanarkshire South Lanarkshire
Council ML3 0AA Medium 60 0 0 0 60 No 01/04/2027 0.000 0.000 0.000 0.000 2.100 2.100
115

Page 116

No Project Housing Market Area Developer Post code Priority
Social rent
Other
affordable
tenures Total
Units
Greener
Standard
Estimated
approval
date
Year 1
23/24
(£m)
Year 2
24/25
(£m) 
Year 3
25/26
(£m)
Year 4
26/27
(£m)
Year 5
27/28
(£m)
Total
(£m) GN SN IMR NSSE
67 Fernbrae Avenue/ Burnside
Road Rutherglen Cambuslang/Rutherglen South Lanarkshire
Council  G73 4AE Medium 48 4 0 0 52 Yes 01/04/2023 0.000 2.205 2.205 0.000 0.000 4.410
68 Old St Mary's Hospital Clydesdale Trust HA ML11 7JU Medium 72 6 0 0 78 Yes 01/04/2024 0.000 4.091 3.072 1.019 0.000 8.182
69 Ladyacre Road, Lanark Clydesdale West of Scotland HA ML11 7JS High 35 4 0 0 39 Yes 27/01/2023 1.000 2.777 0.000 0.000 0.000 3.777
70 Provost Gate, Larkhall  Hamilton West of Scotland HA ML9 1DN High 12 0 0 0 12 Yes 31/02/2023 1.199 0.000 0.000 0.000 0.000 1.199
71 Raploch Street, Larkhall  Hamilton West of Scotland HA ML9 1AE High  14 1 0 0 15 Yes 31/01/2023 1.156 0.000 0.000 0.000 0.000 1.156
72
St Andrew's Church John
St/Haddow St, Hamilton
Phase 2
Hamilton West of Scotland HA ML3 7EU High 3 0 0 0 3 Yes 29/03/2022 0.000 0.000 0.000 0.000 0.000 0.000    
Overall total  2100 462 0 0 2562  59.895 75.962 40.665 23.094 10.546 210.162
SLC total 1173 216 0 0 1389 20.014 42.391 26.819 9.776 2.100 101.100
RSL total 927 246 0 0 1173 39.881 33.571 13.846 13.318 8.446 109.062
Table 2.1 - Housing infrastructure fund (hif) grant projects 
Affordable housing units directly provided
by infrastructure funding – by estimated
completion date
Market housing units directly provided by infra-
structure funding – by estimated completion
date Hif grant funding required
Project Appli-
cant
Current
site
owner
Brief description of
works for which infra-
structure funding is
sought (provide work
headings – do not insert
“infrastructure works”)
Is project linked
to direct provision
of affordable
housing?
23/24 24/25 25/26 Post
26/27
Affordable
total over
period
23/24 24/25 25/26 Post 
26/27
Market total
over plan
over ship 
period
23/24 24/25 25/26 Post
26/27
Total hif
grant fund-
ing required
NIL return
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Table 2.2 - Housing infrastructure fund (hif) loan projects 
Affordable housing units directly provided
by infrastructure funding – by estimated
completion date
Market housing units directly provided by infra-
structure funding – by estimated completion
date Hif loan funding required
Project Appli-
cant
Current
site
owner
Brief description of
works for which infra-
structure funding is
sought (provide work
headings – do not insert
“infrastructure works”)
Is projec– linked
to direct provision
of affordable
housing?
23/24 24/25 25/26 Post
26/27
Affordable
total over
period
23/24 24/25 25/26 Post 
26/27
Market total
over plan
over ship 
period
23/24 24/25 25/26 Post
26/27
Total hif
loan funding
required
NIL return
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 
116

Page 117

Table 3 - Potential Hif affordable 
Units - tenure Units - type
Greener
stand-
ards
Ap-
proval
date
Unit site starts Units - completions SG AHSP  funding requirement
(£0.000m)
Pro-
ject
Sub-
area
Devel-
oper
So-
cial
rent
Mid
mar-
ket
rent
LCHO Im-
prove-
ment for
sale
Total
units
GN Spe-
cialist
Provi-
sion
Type
of spe-
cialist
partic-
ular
need
(if
known)
Total
units
by
type
Enter Y
or N
Finan-
cial
year
(esti-
mated
or ac-
tual)
23/24 24/25 25/26 Post
26/27
Total
site
starts
over
pe-
riod
of
SHIP
23/24 24/25 25/26 Post
26/27
Total
comple-
tions
over
SHIP
period
23/24 24/25 25/26 Post
26/27
Total
AHSP
fund-
ing re-
quired
over
SHIP
period
NIL return
Table 4 - Affordable housing projects funded or supported by sources other than the RPA/TMDF budget     
Approval date 
Total
site
starts
Unit completions
Total
unit
comple-
tions
Non SG
funding
total
Other
non-
AHSP
SG fund-
ing (if
applica-
ble)
Total
funding
Project
address Sub-area Developer
Funding
support
source
Finan-
cial
Year
(actual
or esti-
mated) 2023/24 2024/25 2025/26 2026/27 2027/28 2023/24 2024/25 2025/26 2026/27 2027/28 £0.000m £0.000m £0.000m
NIL return  0 0 0 0 0   0 0 0 0 0        
Total 0 0 0 0 0   0 0 0 0 0        
Table 5.1 - Council tax on second and empty homes (£0.000m)
Year Tax raised or in
hand
Tax used to sup-
port affordable
housing
Tax carried forward to
subsequent years
2017/18 £0.42 £0.42 0
2018/19 £0.46 £0.46 0
2019/20 £0.46 £0.46 0
2020/21 £0.47 £0.47 0
2021/22 £0.54 £0.54 0 
117

Page 118

Table 5.2 - Developer contributions (£0.000m)
Year Sum raised or
in hand
Sum used to
assist housing
Sum carried forward to
subsequent years
Affordable units fully
funded from contributions
2017/18 £0.71 £0.45 £0.30 n/a
2018/19 £1.19 £0.71 £0.48 n/a
2019/20 £2.54 £1.66 £0.88 n/a
2020/21 £1.44 £0.44 £1.06 139
2021/22 £2.40 £1.34 £1.06 tbc
118

Page 119

119

Page 120

120

Page 121

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Housing Services Customer Involvement Strategy 2018-
2022 Annual Review 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the completion of the fourth annual review of Housing
Services Customer Involvement Strategy 2018-2022
 provide details on the proposals to develop a next Housing Services Customer
Involvement Strategy during 2022/2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Housing Services Customer Involvement Strategy 2018-2022 Annual
Review 2021/2022, as detailed within Appendix 1, be noted; and
(2) that the proposed timeline for development of the next Housing Services
Customer Involvement Strategy, be approved.
[1recs]
3. Background
3.1. Housing Services Customer Involvement Strategy 2018-2022 was approved by
Housing and Technical Resources Committee in May 2018. 
3.2. This is the fourth Customer Involvement Strategy developed in partnership with the
Tenant Participation Co-ordination Group (TPCG).  The strategy outlines how
Housing Services will continue to engage with and involve customers in developing
and shaping housing services. The Strategy was produced in accordance with the
requirements of the Housing (Scotland) Act 2001 and reflects the principles of both
the Community Empowerment (Scotland) Act 2015 and the National Standards for
Community Engagement. 
3.3. The Strategy is structured around four distinct strategic outcomes:- 
♦ Customers are informed and knowledgeable
♦ More customers are involved
♦ Customers help to drive continuous service improvement
♦ Customers help to shape change and make a difference 
3.4. A total of 23 objectives and associated actions are contained within the Strategy. 
These outline how Housing Services and its partners will work to achieve each of the
four outcomes.  
12
121

Page 122

3.5. As detailed throughout the annual review, a range of actions have not been able to
be progressed as intended due to the impact of the COVID-19 pandemic and
associated restrictions.  As such, TPCG members proposed that the Strategy
continue in its current form to enable commencement or completion of these actions
throughout 2022/2023, with a new strategy developed and submitted to Housing and
Technical Resources Committee for approval in 2023/2024. 
4.  Annual Review 2021/2022
4.1. The review covers the period between 1 April 2021 and 31 March 2022 and was
completed by officers from Housing and Technical Resources, in partnership with
customer representatives from the TPCG, supported by the South Lanarkshire
Tenant Development Support Project (SLTDSP).   
4.2. In summary, the review highlights that good progress has been made in relation to
16 of the 23 objectives contained across the four strategic outcomes. This includes
progress in relation to the following areas:-   
• the Budget Scrutiny Group led a significant programme of engagement in the
2022/23 rent setting process through use of virtual platforms and an online
survey.  Although it was not possible to host physical public events to promote
the survey, 1,133 surveys were completed 
• customers participated in the review of the Anti-Social Behaviour Policy and
provided feedback via a consultation questionnaire, online meetings and social
media
• significant progress continues in relation to engagement with Gypsy/Traveller
residents at both Shawlands Crescent and Springbank Park. In recognition of
this positive approach, the Council and community members were awarded the
COSLA excellence award for ‘Excellent People, Excellent Outcomes’ and the
UK-wide ‘Innovation in Building Diversity and Inclusion’ award by Municipal
Journal Awards 
• improvement in the ability for customers to engage with the Council including
the development of capacity for digital engagement/connectivity with:- 
➢ 79 devices provided to homeless households across South
Lanarkshire. This consisted of 55 from ‘Bringing IT Home’ (funded
through the Rapid Rehousing Transition Plan) and 24 from the
national ‘Connecting Scotland’ programme
➢ 40 devices provided to sheltered housing tenants and 10 for
sheltered housing communal spaces from the ‘Connecting
Scotland’ programme, tackling social isolation and helping residents
access on-line services
➢ through funding provided by the Council and Scottish Procurement
Alliance, the Council installed free-to-access Wi-fi at both
Gypsy/Traveller sites. This aims to support residents to access
education and employment resources, as well as tackle digital
exclusion and social isolation issues that exist within the wider
Gypsy/Traveller community  
122

Page 123

• to ensure clarity of language in communications, the Customer Publicity Group
reviewed and identified changes to the Anti-social Behaviour Policy, Housing
News publications and rent letters 
• the Mystery Shopping exercise on the virtual call handling approach in relation
to housing options and housing management was completed on 31 March
2022.  The effectiveness and ease of use of the call handling approach was
confirmed as 97% of participants reported the process as being streamlined
and easier to follow 
• additional tenant scrutineers have now joined the Customer Scrutiny Group 
• for the thirteenth consecutive year, an annual programme for customer
engagement and involvement was agreed with customers 
4.3. There were seven objectives categorised as ‘to be reported later’, where progress
was unable to be made during the year.  The actions associated with four of the
objectives were unable to be progressed due to the continuing impact of COVID-19
restrictions, which prevented face to face contact, the main way of engaging with
specific customer groups, who had limited or no means to engage virtually.   
4.4. Due to education priorities a Young Persons Housing Forum was unable to be
established therefore this action will continue to be progressed. 
4.5. Two customer engagement objectives relating to the implementation of the new
integrated IT system will also be reported later.  Discussion has commenced with the
TPCG in relation to the new system and this will continue in line with the revised
implementation timeline. 
4.6. A phased approach of hybrid meetings with the TPCG and other customer groups
has now been established with the first meeting of the TPCG held on Tuesday 9
August 2022.   
4.7. In addition to monitoring progress against the strategic outcomes of the Strategy, the
review also provided an opportunity to re-examine the Strategy in general to ensure
that outcomes, objectives and actions remain appropriate and relevant. In carrying
out the review it was identified that there was no requirement for any amendments to
be made to the Strategy. 
4.8. The full review document and associated Action Plan can be found in Appendix 1. 
5. Priorities and Considerations for 2022/2023 
5.1. As part of the review, customer representatives within the Tenant Participation Co-
ordination Group highlighted the priorities they wish to see progressed by Housing
Services in 2022/2023, this includes:- 
• co-develop the next Customer Involvement Strategy
• further develop communication with new tenants promoting customer
involvement
• develop and improve engagement opportunities for young people
• publish calendar with activities and events such as details of budget setting
consultation and scrutiny activities  
123

Page 124

5.2. Officers will continue to work with customer representatives and other services and
partners to progress these priorities throughout 2022/23. In addition, consideration
will be given as to how the current approach to and methods of engagement can be
developed as part of the next strategy, revised and improved to meet the continually
evolving requirements of housing and homelessness customers. 
6. Proposed revisions to the Customer Involvement Strategy Action Plan       
6.1. The are no proposed revisions to the current Strategy with opportunities for customer
engagement continuing to be promoted and encouraged across all housing and
homelessness services. 
7. Next Steps
7.1. The outcomes from the Customer Involvement Strategy Annual Review 2021/2022
will be shared with relevant stakeholders. 
7.2. The priority areas detailed at 5.1 will be progressed by the relevant services. 
7.3. A new Housing Services Customer Involvement Strategy will be developed in
conjunction with customer representatives throughout 2022/2023, with a proposed
submission date to Housing and Technical Resources Committee in 2023/2024. 
8.  Employee Implications
8.1. There are no employee implications associated with this report.
9. Financial Implications
9.1. There are no financial implications associated with this report.
10.  Climate Change, Sustainability and Environmental Implications
10.1.  This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
11. Other Implications
11.1. There are no additional risks associated with this report.
11.2. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
12. Impact Assessments and Consultation arrangements
12.1. An equalities impact assessment was completed for the Housing Services Customer
Involvement Strategy 2018-2022. 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
9 September 2022 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable  
124

Page 125

List of Background Papers
 South Lanarkshire Council, Housing Services Customer Involvement Strategy 2018-
2022 
Contact for Further Information
If you would like further information, please contact:-
Annette Finnan, Interim Executive Director, Housing and Technical Resources 
e-mail:  Annette.finnan@southlanarkshire.gov.uk 
125

Page 126

Appendix One 
Housing Services 
Customer Involvement Strategy 
2018-2022 
Annual Review 2021/22 
126

Page 127

If you need this information in another language or format, please contact us to discuss how
we can best meet your needs. Phone: 0303 123 1015 or email
equalities@southlanarkshire.gov.uk
Contents         
1.  Introduction 
2.  Summary of progress     
3.  Amendments and additions 
4.  Independent advice and support 
5. Next Customer Involvement Strategy 
6. Resourcing Customer Involvement   
7. Key priorities for 2022/23 
8. Reporting       
Action Plan 2021/22 Update
South Lanarkshire Customer Scrutiny Programme 
127

Page 128

1. Introduction
1.1 South Lanarkshire Council’s Housing Services Customer Involvement Strategy
2018-22 was approved by Housing and Technical Resources Committee in May
2018.   
1.2 This is the fourth annual review of the strategy and aims to summarise the progress
that has been made between 1 April 2021 and 31 March 2022, whilst also outlining
challenges or changes that have occurred during this period. The review was carried
out in conjunction with customer representatives from the Tenant Participation Co-
ordination Group (TPCG) and supported by the South Lanarkshire Tenant
Development Support Project (SLTDSP). 
1.3 The strategy is focused upon four strategic outcomes: 
• Customers are informed and knowledgeable 
• More customers are involved 
• Customers help to drive continuous service improvement 
• Customers help to shape change and make a difference   
The four strategic outcomes contain a total of 23 objectives that outline how Housing
Services, customers and other stakeholders will work to achieve each of these. The
full list of objectives, and the subsequent actions are listed along with the progress
made towards each within the year, in Appendix 1. 
2. Summary of progress during 2021/22
2.1 Despite the challenges presented to services throughout 2021/22, the annual review
process identified that 70%, 16 of the 23 objectives contained within the strategy
have been progressed.  The majority of objectives that have not been achieved has
is in relation to the restrictions during the pandemic. 
2.2 During 2021/22 progress has been made in the following areas:- 
• the Budget Scrutiny Group led a significant programme of engagement in
the 2022/23 rent setting process through use of virtual platforms and an
online survey.  Although it was not possible to host physical public events
to promote the survey, 1,133 surveys were completed; 
• customers participated in the review of the Anti-Social Behaviour Policy
and provided feedback via a consultation questionnaire, online meetings
and social media;
• significant progress continues in relation to engagement with
Gypsy/Traveller residents in development of masterplans for both
Shawlands Crescent and Springbank Park.  In recognition of this positive
approach, the council and community members were awarded the COSLA
excellence award for ‘Excellent People, Excellent Outcomes’ and the UK-
wide ‘Innovation in Building Diversity and Inclusion’ award by Municipal
Journal Awards; 
• further improvement in the ability for customers to engage with the council
in the development of capacity for digital engagement/connectivity with:-
128

Page 129

➢ 79 devices provided to homeless households across South
Lanarkshire. This consisted of 55 from ‘Bringing IT Home’ and 24
from ‘Connecting Scotland’ programmes. 
➢ 40 devices provided to sheltered housing tenants and 10 for
sheltered housing communal spaces from Connecting Scotland.
➢ Through funding provided by the Scottish Procurement Alliance, the
council installed free-to-access Wi-fi at both Gypsy/Traveller sites.
This aims to support residents to access education and
employment resources, as well as tackle digital exclusion and
social isolation issues that exist within the wider Gypsy/Traveller
community.   
• to ensure clarity of language in communications, the Customer Publicity
Group reviewed and identified changes to the Anti-social Behaviour Policy,
Housing News publications and rent letters; 
• the Mystery Shopping exercise on the virtual call handling approach in
relation to housing options and housing management was completed on 31
March 2022.  The effectiveness and ease of use of the call handling
approach was confirmed as 97% of participants reported the process as
being streamlined and easier to follow; 
• additional tenant scrutineers have now joined the Customer Scrutiny
Group; 
• for the thirteenth consecutive year, an annual programme for customer
engagement and involvement was agreed with customers. 
2.3 There were seven objectives categorised as ‘to be reported later’, where progress 
was unable to be made during the year.  The actions associated with four of the 
objectives were unable to be progressed due to the continuing impact of Covid-19 
restrictions, which prevented face to face contact, the main way of engaging with 
specific customer groups, who had limited or no means to engage virtually.   
2.4 Due to education priorities a Young Persons Housing Forum was unable to be 
established therefore this action will be progressed during 2022/23. 
2.5 Two customer engagement objectives relating to the implementation of the new 
integrated IT system will also be reported later.  Discussion has commenced with the 
TPCG in relation to the new system and this will continue in line with the revised 
implementation timeline. 
2.6     In addition to monitoring progress against the strategic outcomes of the strategy, the 
review also provided an opportunity to re-examine the strategy in general to ensure 
that outcomes, objectives and actions remain appropriate and relevant. In carrying 
out the review it was identified that there was no requirement for any amendments to 
be made to the strategy at this time.   
2.7 The associated Action Plan can be found in Appendix 1. 
3. Independent Advice and Support 
3.1 Following discussions with customer representatives between October and
December 2021 it was agreed to extend the current contract with the Tenants
Information Service (TIS) by a further 12 months to 31 May 2023. The procurement
129

Page 130

exercise is now complete and a new Project Workplan agreed with customer
representatives. 
4. Beyond the Customer Involvement Strategy 2018-2022
4.1 It is intended that the next Customer Involvement Strategy will be developed in 
conjunction with customer representatives over the remainder of 2022/23, with 
appropriate consultation taking place.  The strategy will then  be submitted for
approval to Housing and Technical Resources Committee in  2023/24.   
5. Resourcing customer involvement
5.1 The strategy recognises that effective customer involvement requires adequate
funding and support. In 2021/22 a range of financial and non-financial resources
were provided to customers and services to improve opportunities for engagement.  
Financial support included:- 
• Annual grant to tenants and resident groups
• Access to independent advice and support from South Lanarkshire Tenant
Development Support Project.
• Financial assistance to attend virtual national conferences/seminars. 
Non-financial support provided to tenants and resident groups included:- 
• Assistance with organising virtual events and meetings
• General administration support
• Assistance to apply for funding
• Production of leaflets and posters 
5.2 In 2021/22 the financial resources spent to support customer involvement was 
£148,795 which is an increase of £19,343(13%) from £129,405 in 2020/21 which
was the start of the pandemic.   
6. 2022/23 Priority areas 
6.1 Over the next year the priority areas which will be progressed by Housing Services,
together with its customers, are outlined below. 
• Co-develop the next Customer Involvement Strategy
• Further develop communication with new tenants promoting customer
involvement 
• Develop and improve engagement opportunities for young people
• Publish calendar with activities and events such as details of budget setting
consultation and scrutiny activities 
6.2 During 2022/23 a phased approach to hybrid meetings, with some participants
joining through virtual platforms while others attended in person, has been
established with the first meeting of the TPCG held on Tuesday 9 August 2022. 
Further discussions will take place during the year to progress a hybrid approach for
all central and local customer engagement activities. 
7. Reporting
7.1 In line with the agreed monitoring and reporting schedule of the Housing Services
Customer Involvement Strategy 2018-22, the contents of this review will be reported
to: 
• South Lanarkshire Tenant Participation Co-ordination Group
• Housing and Technical Resources Resource Management Team
130

Page 131

• Housing and Technical Resources Committee 
131

Page 132

Appendix 1: Action Plan 2021/22 Update 
Key 
Achieved – performance is in line with or better than expected 
Partially achieved – performance is not in line with expectations and has slipped
To be reported later/not yet acheived
Removed from strategy 
Strategic Outcome 1: Customers are informed and knowledgeable    
Objective Action Timescale Progress update as at 31 March 2022
1.1 Work with the Customer
Publicity Group (CPG) to
assess and approve
communication intended
for distribution to tenants
and other customers
Establish new ways of
communicating with and involving
customers through use of text,
email and social media
2019/2020
onwards
Customer Publicity Group(CPG) aware of advantages of using
digital platforms to reach more tenants/customers going forward. 
Discussions with the CPG will continue in relation to increasing
the use of social media and the South Lanarkshire View for
promoting/updating on current housing issues.   
The rent setting consultation process was developed and agreed
with tenants with a focus on the online survey though council
website.  Promotion of survey took place through the council’s
social media platforms and text and emails sent to over 10,000
tenants who ‘opted in’ to receiving information in this way. 
CPG to meet as required to
assess publications
2019/2020
onwards
CPG approved the Autumn edition of the Housing News, which
focused on 2020/21 Charter performance and was delivered to
all tenants in October 2021. 
CPG also approved the rent increase letter advising tenants of
the increase in rent for 2022/23.  In addition, CPG also approved
revisions to current routine rent letters that are used by
operational staff. 
132

Page 133

Strategic Outcome 1: Customers are informed and knowledgeable    
Objective Action Timescale Progress update as at 31 March 2022
1.2 Ensure ‘Housing News’
and ‘Sheltered Housing
News’ articles continue to
be relevant and of interest
to customers with a
particular focus on
performance and service
improvement plans
Agree arrangements to ensure
customer involvement in each
edition of ‘Housing news’ and
‘Sheltered Housing News’
2019-2020
onwards
CPG reviewed articles and graphics for Housing News
publications and stated that the pictures provided a visual story
to the articles.
Use ‘Housing news’ and
‘Sheltered Housing News’ to
feedback on customer
consultation/participation and
how this will be used to shape
service delivery
CPG approved Spring and Autumn 2021 editions of Housing
News.  The Summer edition included articles developed by CPG
and TPCG on digital empowerment and the role of the SLTDSP,
the role of the TPCG in responding to the Scottish Government
Housing to 2040 consultation and the rent setting process for
22/23. 
Agreed ongoing involvement with future editions of Housing
News, which will include developing articles. 
Publication of Sheltered Housing News was fully reinstated. 
Autumn/Winter 2021 edition was issued December 2021.   
Sheltered housing staff continue to engage with tenants to
shape content, while Head of Service column encourages
tenants to provide their feedback on the service. 
Produce a landlord performance
report in consultation with tenants
and in line with Scottish Social
Housing Charter (SSHC)
guidelines
The TPCG reviewed the 2020/21 Charter information prior to the
report being submitted to the Scottish Housing Regulator in May
2021. Discussions on key aspects of the council’s performance
took place as a result.
1.3 Continue to report on
landlord performance and
provide comparisons in
relation to other social
landlords
Provide comparison of
performance in relation to other
social landlords through Housing
News and council website
Annually (by
31 October)
The Charter performance information, as agreed by TPCG, was
published within the Autumn 2021 edition of Housing News and
also on the council website which contains comparative
information against other landlords. 
CPG to review and make
recommendations for
improvement to content and
information
2020-2021
onwards
The CPG continue to be involved in reviewing customer
involvement pages on the council website.   
133

Page 134

Strategic Outcome 1: Customers are informed and knowledgeable    
Objective Action Timescale Progress update as at 31 March 2022
Discussions continue to highlight the advantages of using digital
platforms to reach more tenants/customers in future.
1.4 Further develop the council
website to reflect best
practice in customer
engagement and to raise
awareness of opportunities
to become involved
Consider ways to promote
customer feedback using ‘real
time’ surveys and by developing
more self-serve options for
customers
2019-2020
onwards
Dialogue has already taken place with the Tenant Participation
Co-ordination Group on how customers will be involved in the
developing and testing of this and discussions will continue to
take place throughout the transition to the new I.T. system.
Undertake online consultation
where appropriate
2019-2020
onwards
Online consultation undertaken for example the rent setting
consultation which received 1,133 responses and the Anti-social
Behaviour consultation received 102 responses.
Establish new ways of
communicating with and involving
customers through use of text,
email and social media
2019-2020
onwards
Consultation activities, for example, the ASB Policy, continue to
be promoted on South Lanarkshire Council’s website, Facebook
and Twitter social media channels. 
ASB service is regularly promoted on social media such as
• an article on drink spiking in consultation with Police
Scotland
• a short animation showing ‘A day in the Life of a
Community Warden’ which received 1700 views on the
councils social media channels
• a video was created with officers from the Mediation
Service illustrating ‘How Mediation can Help’ which
reached 9,535 people
• an article on how to report anti-social behaviour to
Police Scotland. 
Meetings of Whitehill Neighbourhood Board advertised on
Facebook and Twitter social media channels which resulted in
increased attendance.
134

Page 135

Strategic Outcome 1: Customers are informed and knowledgeable    
Objective Action Timescale Progress update as at 31 March 2022
1.5 Develop the use of social
media to encourage
greater knowledge and
understanding of housing
services and performance
and to encourage more
customer feedback
Publicise and encourage
attendance at events to raise
awareness and promote
networking opportunities
2019-2020
onwards
The Project continues to undertake outreach, promotion and
participation of South Lanarkshire Council housing services
through Facebook and Twitter social media channels. 
The Project promoted online opportunities to participate in the
Scottish Government’s Housing to 2040 strategy and ‘A New
Deal for Tenants’ Rented Sector Strategy. 
1.6 Promote customer
awareness of opportunities
for customer involvement
Publish Annual Participation and
Communication programme on
council website
2019-2020
onwards
Customer involvement opportunities such as rent setting
continue to be promoted on council website, Facebook and
Twitter social media channels and also on the council’s tenant
participation page on the SLC website. 
1.7 Co-produce annual
calendar highlighting
customer involvement
activities and events
Publish calendar with activities
and events
2018-2019
onwards
A range of approaches were used during the year to highlight
engagement opportunities for tenants and other customers. 
This included promotion within publications, on the council
website and through Facebook and Twitter social media
channels. 
Whilst the formal calendar was not produced due to Covid-19
restrictions, a range of approaches were used during the year to
highlight engagement opportunities for tenants and other
customers. 
135

Page 136

Strategic Outcome 2: More customers are involved  
Objective Action Timescale Progress update as at 31 March 2022
2.1 Develop and implement
annual local area
participation plans for each
housing management area
to improve engagement
Develop local area participation
plans reflecting local needs and
priorities
2019-2020
onwards
This work was not progressed due to Covid-19 restrictions
relating to travel and personal contact. Consideration will
however be given to the development of local area participation
plans in 2022/23. Monitor and review plans
annually and identify actions to
be progressed
2019-2020
onwards
2.2 Encourage involvement and
feedback from less engaged
groups of customers
Use customer profile information
to identify less engaged
customer groups
2019-2020
onwards
Customer engagement continues to be promoted to less
engaged groups of customers. 
At the onset of the pandemic, services produced service specific
newsletters for Sheltered Housing tenants and Gypsy/Travellers
site residents. These provided essential information on changes
to services and detailed how the council could support them
during the challenges of the pandemic and who else could help. 
This communication has continued with regular publications
provided to both sets of customer groups. 
Due to Covid-19 restrictions the Sheltered Housing Forum did
not recommence during 2021/22 however proposals to reinstate
the forum are now being taken forward by the local Sheltered
Housing Team Leader in conjunction with the Forum
Chairperson in 2022/23. At the two Gypsy/Traveller sites, work
has progressed on a collaborative basis with site residents to
develop detailed site masterplans which detail the range of
improvement works being taken forward at the sites. Virtual
meetings has continued with a strong attendance from site
residents. 
The Housing Disability Sub-Group meetings continue to meet
virtually and some examples discussed during 2021/22 was The
Fairer Scotland Duty, The Rented Sector Strategy – A New Deal
for Tenants and Housing to 2040. 
Identify opportunities to target
specific engagement with these
groups of customers
2019-2020
onwards
Review, update and promote
interested individual database..
2019-2020
onwards
136

Page 137

Officers from the Central Homeless Team have been working
with a group of people who have lived experience of
homelessness. This includes provision of peer mentoring
training in conjunction with Homelessness Network Scotland
with a view to involving the group in a range of consultation and
review activity to improve services provided. 
2.3 Establish customer panels Promote customer involvement,
feedback and comments through
a range of digital channels
2019-2020
onwards
The project continues to develop and promote opportunities for
involvement through its social media feeds. 
The Budget Scrutiny Group successfully delivered a virtual
tenant-led Conversation Café to close the Annual Budget and
Rent Setting Consultation 2022-23. 
2.4 Undertake an awareness
raising programme for
customer scrutiny activities
to encourage active
participation in them 
Develop a programme of
scrutiny opportunities
2019-2020
onwards
The scrutiny programme was reinstated during 2021/22 with a
mystery shopping exercise carried out on the Housing Service’s
virtual call handling approach. 
The findings from the first phase of the exercise highlighted a
positive experience, with CSG members noting that the process
was straightforward, clear and concise; staff were helpful and
polite; and enquiries dealt with efficiently.   
Discussions are underway with tenants/customers to agree the
scrutiny programme for 2022/23. 
Recruit customers for future
scrutiny activities through
Customer Scrutiny Framework
2019-2020
onwards
• As part of the 2022/23 work plan, the SLTDSP will
continue to promote opportunities for customers to
become involved in customer scrutiny including four new
scrutineers trained during the year.  Proposals to date
include completing exercises on the gas servicing
programme and homelessness assessment and out-of-
hours services. 
137

Page 138

2.5 Deliver and further develop
engagement opportunities
with Gypsy/Travellers
Annual focus group meeting with
Gypsy/Travellers at Shawlands
Crescent, Larkhall 
2019-2020
onwards
Regular virtual and in-person meetings continue to take place
between residents of Shawlands Crescent and council officers, 
with strong attendance. The meetings are used as an
opportunity for officers to update residents on services and
improvements taking place at the site, and for residents to
highlight issues or discuss concerns they may have.  Each
meeting is followed by the issue of a site newsletter which
includes details of the discussion at the meeting and other
information that may be of interest to residents. 
At Springbank Park, residents continue to be offered
opportunities to meet in a group with officers however have so
far elected to maintain one-to-one engagement with the site
officer and local housing management team.  This is supported
through the issue of regular site specific newsletters. 
In recognition of this positive approach, the council and
community members were awarded the COSLA excellence
award for ‘Excellent People, Excellent Outcomes’ and the UK-
wide ‘Innovation in Building Diversity and Inclusion’ award by
Municipal Journal Awards. 
2.6 Develop and improve
engagement opportunities
for young people
Arrange workshop with Youth
Council to identify how they wish
to be involved
2019-20
onwards
Progress has been limited due to the impact of the pandemic
and the restrictions put in place. However these actions will be
progressed in conjunction with Education Resources.
Establish Young Persons
Housing Forum
2019-20
onwards
Explore and identify where
existing groups and activities
exist that are engaging with
young people
2019-20
onwards
Develop the use of social media
to target views of young people
2019-2020
onwards
The promotion of all consultation activities and events on the
council’s social media channels routinely takes place, for
example rent setting 2022/23.
138

Page 139

2.7 Develop and improve
engagement opportunities
for homelessness service
users 
Explore key ways to make
involvement effective
2019-2020
onwards
Service user feedback used to inform both the Rapid Rehousing
Transition Plan and the Local Child Poverty Action Report,
ensuring voices of lived experience are represented at strategic
level.  This was facilitated through contact with service users to
request that they share their experiences in the form of case
studies. Feedback experience in relation to lived experience was
used to inform the Local Child Poverty Action Report 2021-22
and the Rapid Rehousing Transition Plan Annual Report 2021-
22. 
Administered by Housing and Technical Resources and funded
jointly by the Scottish Government and Scottish Procurement
Alliance, 79 devices with wi-fi connectivity were provided to
homeless households across South Lanarkshire’. This consisted
of 55 from Bringing IT Home and 24 from Connecting Scotland. 
Officers from the Central Homeless Team have been working
with a group of individuals who have lived experience of
homelessness. This includes provision of peer mentoring
training in conjunction with Homelessness Network Scotland
with a view to involving the group in a range of consultation and
review activity to improve services provided.
2.8  Continue to provide a range
of training opportunities
Develop and publicise annual
training programme to ensure
that customers have the
knowledge, skills and confidence
to become involved 
2019-2020
onwards
Training and support continue to be available to recipients and
households in receipt of Connecting Scotland devices. 
TPCG representatives receive ongoing briefings and training
sessions with ongoing national policy, strategy and legislative
developments, such as:
• Housing to 2040
• A New Deal for Tenants Rented Sector Strategy 
2.9 Develop a programme of
estate walkabouts and
encourage tenants and
other customers to
participate
Arrange and deliver a
programme of local estate
walkabouts
2019-2020 Due to ongoing Covid-19 restrictions and in accordance with
Scottish Government guidance, estate walkabouts were unable
to take place during 2021/22.  Consideration will be given to
implementing a programme of estate walkabouts in 2022/23.
Develop an action plan to
address issues identified and
feedback - ‘You Said, We Did’ 
2019/20 An action plan was not developed due to no walkabouts taking
place in 2021/22.   
139

Page 140

Strategic Outcome 3   
Customers help to drive continuous service improvement   
Objective Action Timescale Progress update as at 31 March 2021
3.1 Deliver an annual
programme of customer
scrutiny through the
Customer Scrutiny Group
(CSG) 
Undertake and report on two
scrutiny activities each year 
2019-2020
onwards
The scrutiny programme for 2021/22 was developed jointly with
tenants/customers.  The first activity was a mystery shopping
exercise focusing on the Resource’s virtual call handling
approach.  Due to the impact of Covid-19, the second activity, to
consider the council’s approach to gas servicing, has been re-
scheduled to take place in during the summer of 2022/23.
Encourage active participation
in the scrutiny activities
2019-2020
onwards
Ongoing support to TPCG and associated scrutiny subgroups to
participate confidently and competently. 
The Customer Scrutiny Group completed a 32 sample mystery
shopping exercise of the SLC Virtual Call Handling Approach
(housing management) in March 2022. A subsequent report was
submitted with findings to SLC. 
3.2 Explore option to establish a
scrutiny panel for older
people 
Develop a proposal for an Older
People Scrutiny Panel
2020-2021
onwards
Progress has been limited due to the impact of the pandemic
and the restrictions put in place. However these actions will be
progressed during 2022/23. 
140

Page 141

Strategic Outcome 4   
Customers help to shape change and make a difference     
Objective Action Timescale Progress update as at 31 March 2021
4.1 Establish regular ‘You Said,
We Did’ feedback to
customers via ‘Housing
news’, the council website
and annual report to tenants
highlighting the difference
made by customer
involvement
Produce ‘You Said, We Did’
report annually.
2019-2020
onward
During 2021/22, customers were provided with feedback in
relation to services within Housing News, for example, 
consultation on the Anti-social Behaviour Policy and rent setting. 
4.2 Communicate outcome of
estate walkabout programme
to customers  
Develop an approach to publish
and report on the outcomes of
estate walkabouts
2019-2020
onwards
To be considered during 2022/23 – linked with 2.10.
4.3 Analyse and report on
feedback from customer
satisfaction surveys and
ensure that it is used to
influence service planning
and delivery.
Review and agree approach to
how satisfaction results are
reported.
2019-2020
onwards
Customer satisfaction programme for 21-22 was agreed and
implemented during the year. Satisfaction outcomes continues
to be a focus for the Council. 
4.4 Develop a system to track
and evaluate customer
involvement activities and
the resulting effect
Explore options to track
feedback from customers on
their involvement and resulting
effect.
2019-2020
onwards
Tenants are kept up to date with progress and are fully involved
in discussions and the development of the new system. 
Develop and implement system  2019-2020
Onwards
4.5 Further develop customer
involvement in identifying
local priorities to be
progressed through
dedicated estate budgets. 
Review options to ensure
effective community
involvement in identifying estate
priorities, including scope to
move to a participatory
budgeting approach.
2019-2020
onwards
Projects continue to be progressed through Housing and
Technical Resources estate improvement budgets across each
of the four divisions in South Lanarkshire. 
141

Page 142

Appendix 2 
1. South Lanarkshire Customer Scrutiny Programme 2021/22
The South Lanarkshire Customer Scrutiny Group (CSG) was formed in July 2016 following the TIS “Making it Happen” Scrutiny
training and development programme which took place earlier in the year. The CSG is at the core of the Customer Scrutiny
Framework.  A key task for the CSG is working with the council to develop a programme for scrutiny work and identify areas of
council housing and homelessness services that need to be reviewed. 
In 2021/22 the Customer Scrutiny Programme involved the customer scrutiny exercise of two service areas/activity within Housing
and Technical Resources:- 
• The virtual customer call handling approach – Phase One of the virtual customer call handling scrutiny exercise
has concluded, with Phase Two scheduled to be completed during Summer 2022
• The gas servicing programme – this scrutiny exercise will now be carried out during 2022 
2. South Lanarkshire Customer Scrutiny Programme 2022/23
The CSG have agreed that the areas/activities for scrutiny for the 2022/23 programme are:- 
• Gas servicing programme
• Homelessness services, in particular, the single assessment service and out-of-hours homelessness services
142

Page 143

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject:   1 Kilmory Road, Carluke – Asset Transfer to Carluke
Men’s Shed 
1. Purpose of Report
1.1 The purpose of the report is to:-
[purpose]
 advise the Committee of the request for asset transfer, by lease, of the former
Wilton Cemetery House, 1 Kilmory Road, Carluke to Carluke Men’s Shed and
request approval to the principal terms and conditions of asset transfer as set out
in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the former Wilton Cemetery House, 1 Kilmory Road, Carluke be leased to
Carluke Men’s Shed subject to the terms and conditions outlined in Section 5
of the report; and
(2) that the Interim Executive Director (Housing and Technical Resources), in
conjunction with the Head of Administration and Legal Services, be authorised
to conclude all matters in respect of the lease and enter into the necessary legal
agreements on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The former Wilton Cemetery House, 1 Kilmory Road, Carluke has been vacant since
2016, having previously been used as an office base by a local charity. 
3.2.  Carluke Men’s Shed have been seeking a new location for their exclusive occupation
as their current premises at High Mill, Carluke is to be the subject of development by
Carluke Development Trust. Carluke Mens Shed submitted a request for Community
Asset Transfer for 1 Kilmory Road, the validation date for which was 13 July 2022. 
3.3. The request includes the house and 2 small outbuildings. 
3.4. In addition to placing the application and supporting documentation on the Council’s
Planning Portal, notices were placed on the property advising that the Council was
considering an asset transfer.  The closing date for responses was 11 August 2021 at
which time 10 representations were received (9 in support and 1 neutral). 
13
143

Page 144

3.5. The request was placed before the Community Asset Transfer Assessment Panel on
12 September 2022 when the following matters were taken into consideration. 
3.6. Property
3.6.1. The extent of the property requested, is shown on the attached plan. 
3.6.2. The Council has a clear and marketable title, however planning consent will be
required for change of use at which time any concerns regarding parking and access
can be addressed. 
3.6.3. The property requires repair and it is estimated that £25,000 is required to bring the
property up to good condition. 
3.6.4.  The market rental of the property has been assessed as £3,800 per annum by the
Council’s in-house valuer. 
3.7. Organisation
3.7.1. Carluke Men’s Shed is a Scottish Charitable Incorporated Organisation (SCIO),
Scottish Charity No. SC049768. The organisation has been established for 2 years. 
3.7.2. The purpose of the organisation is to provide recreational facilities or the organisation
of recreational activities, with the object of improving the conditions of life for the
persons for whom the facilities or activities are primarily intended. 
3.7.3. The organisation has 25 members, with potential to expand at the new location. 
3.7.4. Although the organisation has not been operating long, there is a strong Board and
programme of activity that can be further developed. 
3.8. Project
3.8.1. The project plans to use the facility as a Men’s Shed and primarily as property
workshops and meeting space. 
3.8.2. The organisation has sufficient funds to cover the initial operating costs and repairs
therefore is not seeking any external funding support at this time. 
3.8.3. The business plan submitted in support of the application under-estimates likely future
operating costs; however, the organisation has a regular income stream as well as a
track record of generating income. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation have the capacity
to further develop the Men’s Shed, delivering support and opportunities to those in the
community that can feel isolated. 
4.2. The community benefits anticipated from the proposal relate to health and wellbeing,
education, environmental and recreation. 
4.3. The Community Asset Transfer Working Group assessed the potential community
benefits and recommend that a discount of 71% be applied to the market value to
reflect the benefits to the community which would suggest a rent of £1,100 per annum.  
144

Page 145

4.4. Carluke Men’s Shed have offered a rental of £500 per annum and to undertake the
repair works estimated at £25,000. This is considered to represent Best Value to the
Council. 
4.5. The risks associated with the asset transfer are considered low. 
5. Proposal
5.1. It is proposed to lease 1 Kilmory Road, Carluke, as shown on the attached plan, to
Carluke Men’s Shed, on the following principal terms and conditions:- 
1. The lease will be to Carluke Mens’ Shed
2. The lease will be for a period of 5 years 
3. The date of entry to be agreed
4. The rental shall be £500 per annum 
5. The lease to be fully repairing and insuring, 
6. The tenants will be required to obtain and exhibit as required public liability
insurance to the value of £5 million for any one claim.
7. The property will be used in conjunction with the tenant’s activities as
operators of a ‘Men’s Shed ‘within the UK Men’s Shed Association.
8. The tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects.
9. Assignation and subletting will not be allowed without the Council's express
consent 
10. Landlord's consent will be required for any structural alterations to the
property
11. Each party to be responsible for their own legal costs however the tenants will
require to pay any registration fees and Land & Buildings Transaction Tax
(LBTT) if required.
12. The offer of lease will be conditional upon planning consent for change of use 
6. Employee Implications
6.1. There are no employee implications for South Lanarkshire Council. 
7. Financial Implications
7.1. The property is vacant and the grant of a lease on a full repairing and insuring basis
removes the Council’s liability for the ongoing maintenance and management of the
property. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015 the Council has until
13 January 2023 to provide a notice of its decision whether to agree to or refuse the
asset transfer request. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale or the asset transfer request be refused.  
145

Page 146

10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community, Land Services, Planning, Legal,
and Finance Services as well as having been published for public consultation. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
8 September 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk 
146

Page 147

13
147

Page 148

148

Page 149

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022 
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Annual Report on the Charter (ARC) 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Scottish Social Housing Charter and the requirement to
produce an Annual Report on the Charter (ARC) covering performance during
2021/2022
 provide an update on arrangements to monitor and report on Charter progress
throughout 2022/2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Council’s reported performance and contextual information for the
Scottish Social Housing Charter and comparisons with other landlords at
Appendix 1, be noted; and
(2) that the future use of the Charter for ongoing scrutiny by the Scottish Housing
Regulator (SHR), tenants and other service users, be noted. 
3. Background
3.1. The Housing (Scotland) Act 2010 introduced a statutory requirement to report on a
range of performance measures and indicators which form the basis of the Scottish
Social Housing Charter (SSHC) and publish an annual report on performance.  The
Scottish Housing Regulator (SHR) is responsible for monitoring and reporting on
overall national performance for all social housing landlords and will use the Charter
as part of its risk based approach to landlord scrutiny. 
3.2. The Charter currently contains 32 measures of performance. These reflect a mixture
of qualitative (survey based information) as well as a range of efficiency and
effectiveness measures. Indicator 23 is specific to Registered Social Landlords
(RSLs) only and Indicator 24, is specific to Local Authorities. In addition, there are
also 13 contextual indicators, 12 of which relate to both councils and RSLs with one
applying only to RSLs. 
3.3.  In line with requirements set out by the SHR, the Resource submitted its 2021/2022
performance information to the Regulator on 26 May 2022. 
14
149

Page 150

4.  Annual Report on the Charter 2021/2022 
4.1.  The SHR published a national report on the Charter at the end of August 2022
covering 16 of the indicators. This report sets out the performance for 2021/2022 of
all 176 social housing landlords in Scotland. 
4.2. The SHR also publishes an electronic version of the charter information and this is
made available through the SHR website. This provides data on the Charter
indicators for all landlords.   
4.3. For the reporting year 2021/2022, the Charter requires that the Council publishes a
more detailed annual report on its performance by the end of October 2022. Tenants
involved in the Tenants Participation Co-ordination Group (TPCG) have contributed
to the development of the style and format of the Council’s report on performance.
This will be available via the Council’s website from 31 October 2022 and also
included within ‘Housing News’ which will be issued during November 2022. 
4.4. The Council’s Charter report is consistent with previous annual reports on
performance, covering the list of reported indicators published by the SHR as well as
a number of other contextual and performance measures relating to the service. As
appropriate and where available, the Council’s published report also provides
comparison with both the Scottish average and that of other local authority landlords. 
5. South Lanarkshire Council Performance 2021/2022
5.1. Based on the SHR’s report on the Charter, the summary report at Appendix 1 sets
out the indicators and provides a comparison with both the Scottish average for all
social landlords, that of the other 26 Scottish local authority landlords and over the
two previous years (where available).   
5.2. The 16 reported indicators include 4 measures which set the context of the size or
scale of landlords and comparisons of performance. The table below sets out the
direction of travel for the remaining 12 reported indicators:- 
Direction of travel  Movement from 2020/2021
Improved  3
Remained same  3
Declined  6 
5.3. In terms of the efficiency and effectiveness indicators which improved in the last
year, the key highlights are detailed below:- 
• average days to complete non-emergency repairs reduced from 13.07 days to
11.76 days
• rent collected as % of total rent due increased from 97.37% to 98.28% 
5.4. A summary of the position and context in relation to the 6 efficiency and
effectiveness indicator areas where performance reduced is detailed below:- 
• average length of time taken to re-let properties increased by 0.65 days from
20.86 days to 21.51 days
• % of anti-social behaviour cases resolved in the last year decreased slightly from
95.2% to 94.3%
150

Page 151

• repairs completed right first time decreased slightly from 99.95% to 99.76%.
• % of stock meeting the Scottish Housing Quality Standard (SHQS) decreased
from 93.5% to 72.25%. The decrease in this indicator is mainly due to the delay
in completing the heat and smoke alarm installation programme
• average length of time taken to complete emergency repairs increased from 3.44
hours to 4.24 hours
• % of rent due lost through properties being empty during the last year increased
from 0.42% to 0.6% 
5.5. It should be noted that although performance has reduced in these areas, in all
cases the Council has performed better than the Scottish Local Authority Average for
2021/2022. 
5.6. Of the remaining indicators, 4 are qualitative satisfaction indicators, 3 of which are
updated on a 3 yearly basis, with one updated annually. 
5.7. The following satisfaction results are derived from a 3 yearly survey and have been
reported previously to committee as part of annual charter update reports:- 
• tenant satisfaction with overall service – 90.3%
• tenants who feel their landlord is good at keeping them informed about their
services and decisions – 92.4%
• tenants who are satisfied with opportunities given to them to participate in their
landlords decision making process – 91.1% 
5.8. The following indicator, which is based upon a survey carried out in 2021/22, shows
a slight increase in satisfaction:- 
• tenant satisfaction with repairs is measured annually and reported an increase
from 90.1% to 91% 
6. Next steps
6.1.  A key objective of the Charter process is to ensure robust scrutiny and consideration
of the performance of landlords.  The comparative aspect of performance against
other landlords will inform and reflect on areas for future tenant and service user
scrutiny and potential areas for service improvement. 
6.2. Housing and Technical Resources’ Resource Plan (2022/2023) includes the majority
of the Charter indicators and these will continue to be monitored and reported as part
of the 6 monthly updates on the Resource Plan to the Housing and Technical
Resources Committee. 
6.3. The comparative aspect of performance continues to be a focus for the Council and
its service users as well as the SHR in assessing and scrutinising local and national
trends in performance. 
7. Employee Implications
7.1.  There are no employee implications as a result of this report. 
8. Financial Implications
8.1. There are no financial implications as a result of this report.
151

Page 152

9. Climate Change, Sustainability and Environmental Services
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10.2. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
11. Equality Impact Assessment and Consultation Arrangements
11.1.  This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore no impact
assessment is required. 
11.2. Consultation and involvement has taken place with service users through the survey
process for a number of indicators and with the Tenant Participation Coordination
Group on the new Charter report.   
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
24 August 2022 
Link(s) to Council Values/Ambitions/Objectives
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 Ambitious, self-aware and improving 
Previous References
 Housing and Technical Resources Committee – SHR Regulation of Social Housing in
Scotland, 4 September 2019
 Housing and Technical Resources Committee – Annual Report on the Charter 2018-19,
25 November 2020
 Housing and Technical Resources Committee – Annual Report on the Charter
2020/2021, 21 September 2021 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Annette Finnan, Interim Executive Director (Housing and Technical Resources)
Ext: 5611 (Tel: 01698 455611)   
E-mail:  annette.finnan@southlanarkshire.gov.uk
152

Page 153

Appendix 1 
Housing and Technical Resources
Projected return to the Charter 2021/2022  
No Scottish Charter Indicators SLC 
19/20
SLC 
20/21
SLC 
21/22
Scottish Local
Authority
Average 21/22
Scottish
Average
21/22
1
% of tenants satisfied with
the overall service provided
by the Council (their
landlord).  
90.3% 90.3% 90.3% 82.5% 87.7%
2
% of tenants who feel their
landlord is good at keeping
them informed about their
services and decisions. 
92.4% 92.4% 92.4% 85.3% 91.1%
3
% of tenants satisfied with
the opportunities given to
them to participate in their
landlord’s decision making
processes.  
91.1% 91.1% 91.1% 80.5% 86.8%
4
% of stock meeting the
Scottish Housing Quality
Standard (SHQS).  
93.2% 93.5% 72.25% 69.70% 74.6%
5
Average length of time taken
to complete emergency
repairs.
3.7 hours 3.4 hours 4.24 hours 4.77 hours 4.1 hours
6
Average length of time taken
to complete non-emergency
repairs.
14.2 days 13.1 days 11.76 days 9.87 days 8.87 days
7
% of reactive repairs carried
out in the last year
completed right first time.
99.91% 99.95% 99.76% 78.79% 88.27%
8
% of tenants who have had
repairs or maintenance
carried out in last 12 months
satisfied with the repairs and
maintenance service. 
92.8% 90.1% 91.0% 87.2% 88.01%
9
% of anti-social behaviour
cases reported in the last
year which were resolved.
98.0% 95.2% 94.3% 93.3% 94.7%
10
% of rent due lost through
properties being empty
during the last year. 
0.49% 0.42% 0.60% 1.63% 1.43%
11
Rent collected as % of total
rent due in the reporting
year.
99.70% 97.37% 98.28% 98.63% 99.28%
12
Average length of time taken
to re-let properties in the last
year. 
21.68 days 20.86 days 21.50 days 59.43 days 51.57 days
C The landlords wholly owned
stock 24,864 25,012 25328 N/A N/A
C Average Weekly Rent £70.26 £73.10 £74.55 N/A N/A
C Rent increase for next
financial year 3.95% 2.20% 2.20% 1.46% 2.98%
C Total Rent Due £89,502,574 £93,969,021 £96,540,465 N/A N/A 
153

Page 154

154

Page 155

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 5 October 2022
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resource Plan 2022-2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
♦ present the Housing and Technical Resource Plan 2022-2023 for consideration
and endorsement 
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:- 
(1) that the Resource Plan 2022-2023, attached as Appendix 1, be noted;
(2) that the Resource Plan 2022-2023 be uploaded onto the Council’s website
following consideration by this Committee; and
(3) that Progress Reports on the Resource Plan 2022-2023 be provided at Q2
and Q4 to future meetings of this Committee. 
3. Background
3.1. The draft Resource Plans for 2022-2023 were prepared prior to the local government
elections in May 2022, in line with the corporate Resource Planning guidance.
Following the election and subsequent approval of the new Council Plan on 15 June
2022, the draft Resource Plans were reviewed and updated to take account of the
new Priorities and Outcomes within Connect 2022-2027. 
3.2.    The Resource Plan is a key element of the Council’s performance management
arrangements.  It provides details of the context within which the Resource operates
and establishes actions and measures for the year ahead based on the priorities set
out in the Council Plan Connect 2022-2027. 
3.3. Performance management is a keystone of Best Value, and ensures that the Council
can demonstrate sound governance arrangements.  The Resource Plan is one part
of the Council’s framework for planning and budgeting, and demonstrates how this
leads to effective front line service delivery. 
3.4. As part of this framework the Resource Plan reflects the aspirations of the Council
Plan and the Community Plan as well as being complemented by the details of
individual Service, Business and other Plans.  Ultimately, these details are included
in the key work objectives of individual officers.  This demonstrates the ‘Golden
Thread’ of performance management which ensures a clear understanding of the
council’s vision, values, ambitions and objectives at all levels. 
15
155

Page 156

3.5. The current format for performance reporting has been established since 2007 and is
used for Executive Directors’ reports to the Chief Executive, Resource Management
Teams and Resource Committees.  The focus has been on reporting progress on
council objectives, statutory performance indicators, other key performance
measures and high level Resource priorities. 
3.6. In preparing the Plan, account has also been taken of the need to ensure a robust
response to Risk Management and Control.  Risks associated with delivery of the
actions in this Resource Plan have been identified and evaluated and are listed in
the Resource Risk Register.  Where necessary, controls or further actions to mitigate
these risks have been agreed.  Such actions are tracked through the Resource Risk
Control Plan which is kept under review by the Risk Sponsor for the Resource. 
4. Resource Plan 2022-2023
4.1. The Resource Plan 2022-2023 is attached as Appendix 1 and is structured around
the following headings:- 
1. Introduction 
2. Key areas of focus for the year ahead 
3. Resource outcomes 
4. Measures and actions 
5. Resourcing the Plan 
4.2. Resource Objectives 2022-2023
The Resource has established a number of objectives to support the delivery of the
Connect priorities in 2022-2023.  These are detailed in Appendix 2. To support these
objectives, the Resource has developed performance measures and an action plan
which are set out in section 4 of the Resource Plan.  A selection of these will be
included in the Council Pan Connect Quarter 2 and Quarter 4 Progress Reports
2022-2023, with the rest being monitored and reported at Resource level. 
4.3. Monitoring and reporting 
As part of the performance management arrangements, the Committee will also
receive a mid-year update of progress on the measures in the Resource Plan –
Quarter 2 Progress Report 2022-2023. 
5. Employee Implications
5.1. The objectives noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
6. Financial Implications
6.1. The objectives within the Resource Plan are reflected in the respective Resource
Revenue and Capital budgets and, longer term, within the framework of the Council’s
approved Financial Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change implications as a result of this report.
156

Page 157

8. Other Implications
8.1. The Community Plan 2017-2027 was agreed at the Community Planning Partnership
Board on 11 October 2017.  A significant element of the delivery of the outcomes in
the Community Plan will come through the achievement of the actions contained
within Connect. 
8.2.  Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
8.3. The Resource Plan takes into account Resource responsibilities in relation to
sustainable development. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
Annette Finnan
Interim Executive Director (Housing and Technical Resources) 
9 September 2022 
Link(s) to Council Values/Priorities/Outcomes
• The Resource Plan has been structured upon the Vision, Values, Priorities and
Outcomes in the Council Plan Connect 2022-2027 
Previous References
• None 
List of Background Papers
• Council Plan Connect 2022-27
• Housing and Technical Resource Plan 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Lynn Hayes (Performance and Support Advisor)
Ext:  4823 (Tel:  01698 454823)
E-mail:  lynn.hayes@southlanarkshire.gov.uk 
157

Page 158

158

Page 159

Housing and Technical Resources
Housing and Technical
Resource Plan 2022-23  
15
159

Page 160

Section Contents Page
1.0 Introduction 1
2.0 Key areas of focus for the year ahead 2
3.0 Resource outcomes  5
4.0 Measures and actions  6
5.0 Resourcing Plan  16 
160

Page 161

1 
Section One – Introduction 
I am pleased to introduce our Resource Plan for 2022-23 which sets out our intended outcomes and
priorities for the coming year. This is the main annual business planning document for the Resource. 
It reflects the council’s key priorities as set out in the Council Plan ‘Connect’ and provides an overview
of the Resource’s main areas of activity. 
This plan demonstrates our clear commitment to deliver on the priorities set out in ‘Connect’ and the
vision, “To Improve the Lives and Prospects of Everyone in South Lanarkshire”.
There are two Services within Housing and Technical Resources which help to ensure that the council
operates successfully in an increasingly complex and challenging environment, and although diverse,
each service is essential to the running of the council and the delivery of its vision, values and priorities.
Housing Services is the fourth largest social landlord in Scotland and is responsible for providing a
comprehensive housing management service, managing 25,012 homes, including 34 Sheltered
Housing complexes and two sites and services for the Gypsy /Traveller community. We provide a
homelessness and housing support service, working to prevent and alleviate homelessness; support
independent living; improve levels of tenancy sustainment and support vulnerable households in our
communities, including refugees. The Service also provides both strategic and support functions
across the Resource, contributing to the Council and national agenda, including community safety and
the development and delivery of additional affordable homes. 
Property Services is responsible for managing the council’s portfolio of properties and land and is
split between three services, Building Services, Assets and Estates and Consultancy Services.  These
services have a wide range of responsibilities including working with all other Resources to develop,
design, procure and, in many cases deliver property construction/improvement projects. The Service
undertakes maintenance works across the property portfolio, including the out of hours repairs service
and carries out legislative compliance works including electrical testing and gas safety checks. The
Service also manages properties for sale and lease and provides strategic support to the Resource
and the council for energy efficiency and the sustainability agenda. 
This Resource Plan has been prepared in the context of the COVID-19 pandemic and the measures
the council continues to take to minimise its spread, deal with its effects and to support communities. 
The long-term impact on the council and its services, including the financial impact, will not be fully
understood for some time.  However, all Resources have response plans which will continue to be
developed in parallel with the Resource Plans. 
Annette Finnan
Interim Executive Director
(Housing and Technical Resources)
161

Page 162

2 
Section Two – Key areas of focus for the year ahead   
2.0. Overview 
The Resource has identified the main challenges, risks and new developments which will
have significant impact on the delivery of services in the coming year.  These are outlined
briefly below. 
2.1. COVID-19 - Response and Recovery
The Resource will continue to give priority to ensuring services are delivered to address
ongoing and emerging challenges presented by COVID-19. Our priority will be placed upon
ensuring effective delivery of critical and statutory services, taking full account of the
continuing or emerging issues which are faced by customers, employees and our Services
stemming from COVID-19. This also includes continued implementation of revised service
and working arrangements which have been put in place to deliver services in the context
of the public health crisis, that have been identified as being both efficient and effective
and suitable for permanent implementation. It is important to recognise that our planning
is informed by, and dependent on, guidance issued by the Scottish Government and
therefore our approach will be subject to continual review and change. 
2.2. Housing to 2040
Published in early 2021, the Scottish Government’s Housing to 2040 publication identified
significant policy changes planned for the housing sector over the next 20 years. This
includes a target of delivering 110,000 additional affordable homes, the introduction of a
Rented Sector Strategy, including proposals to introduce new legislation aimed at aligning
standards within both the private and social rented sectors, new housing quality standards
and accelerated energy efficiency targets. The Resource will continue to monitor progress
in relation to all aspects of this document, working with housing, health and homelessness
partners across South Lanarkshire to meet any new requirements. 
2.3. Financial Considerations
In order to continue to maintain, invest and meet legislative requirements for council
housing and services, maximising rental income and minimising arrears will continue to be
a priority for the Resource. However, we recognise that the ongoing situation will be having
a significant impact to the financial capacity or security of many.  It is therefore our intention
to continue to set affordable rents and provide advice and assistance where necessary to
support our tenants and customers, while contributing to the wider tackling poverty agenda. 
2.4. Preventing and Alleviating Homelessness
The year ahead is expected to be a pivotal year for homelessness in South Lanarkshire
and the Resource will continue to ensure that services are developed and delivered to
meet requirements. We will work closely with our partners to address emerging issues and
the priorities identified in the South Lanarkshire Rapid Re-housing Transition Plan 2019-
24. We will continue to review our supply of temporary & supported accommodation to
ensure it is suitable and meets demand and need.  We will also continue with our approach
in delivering our Housing Options service with a focus on homeless prevention to support
and assist people who are homeless or at risk of becoming so and to ensure access to
settled accommodation and support services for homeless households. 
The Resource will continue to work in partnership and seek to further develop person
centred housing and support packages for vulnerable households, including continued joint
working with corporate parenting partners, strengthening our pathway planning approach,
and Women’s Aid South Lanarkshire and East Renfrewshire to further develop responses
to domestic abuse.  This approach links to wider objectives of the South Lanarkshire
Gender Based Violence Partnership and takes account of Chartered Institute of Housing
162

Page 163

3 
and Women’s Aid guidance and recent changes in legislation namely the implementation
of the Domestic Abuse Protection (Scotland) Act 2021. The Resource will also continue to
implement the aims and objectives of the SHORE (Sustainable Housing on Release for
Everyone) standards, working with partners to prevent homelessness and stop the cycle
of reoffending contributing to community safety.
2.5. Continuing to improve the supply and availability of housing
The Resource will continue to deliver on its Home+ programme to increase the supply of
council homes through the building of new homes and purchasing existing ones from the
open market. In addition, by working with RSL partners, the Resource will also continue to
meet housing needs by letting houses efficiently, effectively and fairly. 
2.6. Provision of Services to Gypsy/Travellers
The Resource currently operates two Gypsy/Traveller sites comprising a total of 24
pitches. The Resource will continue to work closely with residents to implement a co-
produced investment masterplan for both sites which includes a range of investment
activities including; pitch expansions, upgrades to amenity buildings and continuing to
implement measures to improve fire safety on sites. 
In addition, the Resource is working with both the Scottish Government and CoSLA to
contribute to the implementation of the national ‘Improving the lives of Gypsy/Traveller’s’
action plan published in 2019. This includes aligning the current local investment priorities
and service provision with the national outcomes contained within the plan. 
2.7. Health and Social Care 
With the approval of the third Strategic Commissioning Plan, The Resource will continue
to contribute to the planning and delivery of services provided through the Health and
Social Care partnership and ensure effective alignment in relation to strategic planning for
housing and homelessness. 
2.8. Development of Integrated Housing and Property Management System
The development and implementation of the new integrated housing and property
management system will remain a key priority for the Resource during 2022/23. This will
progress in tandem with ensuring effective operation of existing systems to meet statutory
and regulatory requirements and further digitisation of services that will enhance our
interactions with customers and tackle digital inclusion. 
2.9. Health and Safety  
Health and Safety legislation and regulations will remain a key area for the Resource to
maximise efforts to reduce accidents and comply with all current and emerging health and
safety legislation for Council buildings and Housing, developing and promoting a safe
environment for employees and customers.   
2.10. Asset Management and Decarbonisation 
The Resource will continue to manage the property and land assets as well as the
commercial portfolio of the council, ensuring it continues to meet requirements in terms of
scale, location, condition, suitability and corporate image. Corporate Standards will be
reviewed to ensure they are kept in a good condition, well maintained, well used and
energy and cost efficient. 
In relation to Council Housing, a key priority will be to ensure provision of well maintained,
appropriate  quality housing which meets the need of existing and future tenants. The
2022/23 Housing Capital Programme reflects the level of investment required to continue
to maintain the Scottish Housing Quality Standard and to increase the proportion of homes
that meet the second phase of the Energy Efficiency Standard for Social Housing by
December 2032 (EESSH2).
163

Page 164

4 
Through the introduction of the proposed New Build Heat Standard, the Scottish
Government will require all new domestic buildings to be installed with a decarbonised
heating source and will not be able to be connected to the existing gas network.  Although
the proposed introduction for the new standard is not until 2024, significant planning will
be required to meet this new requirement. This includes changes to suppliers and
procurement routes, as well as training and restructuring existing services. As
decarbonised heating sources are also currently more expensive to run than traditional
heating sources, consideration will also need to be given to how the installation and
maintenance costs are met, as well as ensuring the homes remain affordable for tenants
to live in. 
The full impacts of the United Kingdom’s exit from the European Union continue to be a
source of great uncertainty.  The potential consequences for the Resource include rising
demands on housing services, the availability and costs of building materials, supplies and
services and possible skills shortages across the construction sector. The Resource will
continue to monitor the potential impact of the withdrawal process on service delivery as
the year progresses. 
2.11. Refugee Re-settlement Programme   
The Resource will continue to manage and support the refugee resettlement
programmes for families who arrive in South Lanarkshire through the following visa
schemes: the UK Resettlement Scheme, the Afghanistan Relocation and
Assistance Policy, the Afghan Resettlement Programme and the Homes for
Ukraine scheme. We will work in partnership with relevant agencies to support new
arrivals and ensure that families move to settled accommodation as quickly as
possible. The Resource will also coordinate the council and partners involvement
in the asylum seeker dispersal programme.   
164

Page 165

5 
Section Three – Resource outcomes 
3.1. Resource Outcomes
The Resource has established the following outcomes to support the delivery of
Connect Outcomes in 2022-23. 
Connect Outcomes Resource Outcomes
Communities and
Environment
• Work with communities to create safe, strong
sustainable places
Health and Wellbeing • Support people to live active and
independent lives
• Help people to continue to live within their
homes and communities through integrated
community health and social care services
Children and Young
People
• Improve the health and wellbeing of children,
young people and families
Housing and Land • Support people to access and sustain
housing which meets their needs through our
Integrated Housing Options service
• Provide a comprehensive range of services
to help prevent and alleviate homelessness
including the provision of suitable temporary
and supported accommodation
• Continue to deliver an affordable housing
programme to meet needs
• Manage the council’s portfolio of properties
and land
• Ensure our repairs service continues to meet
the needs of customers
• More energy efficient council homes
• Continue to engage and work with tenants
and other customers to design our services
• Provide high quality services to our service
to our tenants, including those who live in
sheltered housing and residents at our
Gypsy / Travellers sites 
3.2. Delivering the Plan and achieving Best Value
In working towards the six Outcomes, the council aims to continually improve and
ensure effective and efficient use of resources, and our business will be conducted with
integrity, transparency and will operate to the highest standards. 
The Resource has established the following outcomes which specifically aim to support
delivery of the plan  and achieving best value. 
Delivering the Plan and
achieving Best Value
Resource Outcomes
• Digital and ICT services meet the needs of
its customer 
• Customers experience high quality and
improving council services
• The council demonstrates high standards of
governance and sound financial stewardship
• The workforce has the skills, flexibility and
capacity to deliver the council’s outcomes
165

Page 166

6 
Section Four – Measures and actions 
4.0. Performance measures and action plan
This section of the Resource Plan is divided into two parts: part (a) sets out our main
performance measures against our outcomes; and part (b) describes the key actions we
will take in the coming year to respond to the challenges ahead and improve services
and outcomes. 
4.a. How we will measure our performance
The impact of Covid continues to have a significant effect on performance for some
services.  The table below shows our key performance measures, with data for the last 2
years and the target for 2022-23.  To provide additional context for the targets, an indication
of pre-Covid performance is provided in the notes column where possible.  The impact of
Covid may mean that some targets are below the level of performance seen pre-Covid,
however they represent an improving picture from the levels seen in the Covid period. 
Resource Outcome:   Support people to access and sustain housing which meets their needs through
our Integrated Housing Option Service 
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
1. % of lets to
Urgent
housing (UH)
need
households
(locally set
target)
61.1% 56.59%  55% to
65% 
C05.01 Housing
The target is set between 55%
65% to ensure progress is made
towards the priorities and
targets set within RRTP. Target
approved by HTR Committee on
8/12/21 as part of Local Letting
Plan Report.
2. % of new
tenancies
sustained for
more than a
year for all
lets 
(locally set
target)
91.9% 93.4% 88%
SSHC 
C05.01  Housing
As anticipated and consistent
with social landlords across
Scotland tenancy sustainment
has been higher during the
pandemic, however, it is
anticipated that this may
decline.  
3. % of tenancy
offers
refused
during the
year
(N/A)
24.7% 16.6% N/A
SSHC 
05.01  Housing
This is a contextual indicator as
refusals are driven by the
applicant and can vary
significantly depending on
size/availability/location of
housing This indicator is
required for the Scottish
Housing Regulator charter
return and is used to benchmark
against all other Scottish LA’s. 
4. Average time
taken to re-
let empty
properties
(locally set
target)
21 days 21.51
days 26 days
05.16 
SSHC
Housing
Performance against this
Charter measure is consistently
good and SLC remains one of
the top performing councils in
void management. Average
Relet times have fluctuated
during the pandemic. 
The target is considered
challenging as it is anticipated
that re-let times will rise due to
166

Page 167

7 
continued disruption to supplies,
materials and the workforce,
delays with contractors and
utilities. 
Resource Outcome:   Provide a comprehensive range of services to help prevent and alleviate
homelessness including the provision of suitable and temporary and supported
accommodation 
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
5. % of
homeless
households
advised of
outcome of
assessment
within 28
days
(locally set
target)
99.8% 99.6% 95%
SG 
05.02
Housing
Performance against this
measure is good. However, to
comply with legislation and
statutory guidance, some
investigations into
homelessness e.g. for
particularly complex cases and
lost contact decisions will result
in the 28 day timescale being
exceeded. 
6. Average
length of time
in temporary
accommodati
on
(locally set
target)
102 days 105 days 120 days
SG 
05.02
Housing
Performance against this
measure in 20/21 was impacted
by the higher level of cases in
temporary accommodation for
shorter periods, linked directly to
the Covid 19 pandemic.
The target has been set, taking
account of the continued
uncertainty in relation to
turnover/ availability of
permanent housing solutions
and the demand for
homelessness services. 
7. % of
households
provided with
temporary
accommodati
on
(nationally
set target)
100% 100% 100%
SG 
05.02
Housing
Good performance against
nationally set target which is
reported to the Scottish
Government.
8. % of
temporary
accommodati
on offers
refused
(locally set
target)
6.84% 7.42% 6.00% 
SG 
05.02
Housing
Slight reduction in performance. 
Will be monitored closely in year
to support achievement of
target. 
9. Number of
times we did
not meet our
obligation to
provide
suitable
accommodati
on
0 0 0
SG 
05.02
Housing Good performance against
nationally set target.
167

Page 168

8 
(nationally
set target)
10. % of Housing
Options
interventions
where
Homelessnes
s prevented
(locally set
target)
78.73% 73.48%  70%  C05.02 Housing
This is a locally set target and is
a key focus for the Resource
.
Operating context continues to
be extremely challenging with
economic conditions likely to
adversely impact upon ability to
prevent homelessness 
Resource Outcome:  Ensure our repairs service continues to meet the needs of customers 
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
11. % of
response
repairs
completed on
time
(nationally
set target)
97.7% 99.1% 90%
SSHC 
C05.16
Property
This target is a statutory
requirement for the Scottish
Housing Regulator. 
12. Average
length of time
to complete
emergency
repair
(contracted
target)
3 hours
25
minutes
4 hours
24
minutes
24 hours
(contracted
target)
SSHC 
05.16
Property
This target is a contractual
arrangement that has been
agreed in conjunction with
tenant representatives and is a
Charter requirement of the
Scottish Housing Regulator. 
13. Average
length of time
to complete
non-
emergency
repair
(contracted
target)
13.07
days
11.76
days
28 days
(contracted
target)
SSHC
LGBF 
05.16
Property
This target is a contractual
arrangement that has been
agreed and is a Charter
requirement of the Scottish
Housing Regulator. 
14. % of reactive
repairs
completed
first time right
(nationally
set target)
99.95% 99.76% 90%
SSHC 
05.16
Property
This target is a statutory
requirement for the Scottish
Housing Regulator. 
15. % of repairs
appointment
kept
(nationally
set target)
94.18% 94% 90%
SHN 
05.16
Property
This target is a statutory
requirement for benchmarking
returns.   
16. Number of
times we did
not, meet our
obligation to
complete the
annual gas
safety check
by annual
411 439 0
SSHC 
05.16
Property
Throughout the period since the
onset of the pandemic, SLC
revised its approach to Gas
Servicing to take account of the
COVID 19 specific guidance
issued by the HSE and the Gas
Safety Register. 
168

Page 169

9 
anniversary
date
(nationally
set target)
Our revised approach took
account of tenants refusing
access because they or another
member of their household was
self-isolating, and/ or they were
anxious about anyone entering
their home.
17. % of tenant
satisfaction
with repairs
or
maintenance
in year
(locally set
target)
90% 91% 90%
SSHC 
05.16
Property
This target is to maintain
performance at 90% and is a
regulatory requirement for the
Scottish Housing Regulator. 
Resource Outcome:  More energy efficient homes  
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
18. % of council
stock
meeting the
SHQS 
(locally set target)
93.5% 72.25% 90%
SSHC 
05.17
Property
Performance has reduced due
to the reporting of Fire Tolerable
Standards and Fixed Electrical
Testing with a robust
programme in place to address
outstanding inspections/testing. 
19. % of council
dwellings that
are Energy
Efficiency
Standard for
Social
Housing 2
(EESSH2)
(locally set target)
4.8% 6.48% 10% C05.17 Property
Review of housing stock
underway to determine the
additional energy measures
required to achieve EESSH 2. 
Resource Outcome:  Work with communities to create safe, strong and sustainable places 
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
20. % of Anti-
Social
Behaviour
cases
resolved in
the year
(locally set
target)
95.2% 94.3% 90%
SSHC 
01.01  Housing
Performance continues to be
strong against this indicator and
target is to maintain
performance at 90% and above. 
169

Page 170

10 
Resource Outcome:  Support people to live active and independent lives 
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
21. Number of
adaptations
completed in
Council
homes
(locally set
target)
476 933
100% of
requests
received
03.01 Property
Performance in this area is
demand led - numbers are
contextual - and can vary
significantly from year to year.
We have updated the target to
100% of adaptations received. 
22. Number of
households
currently
waiting for
adaptations
to their home
(locally set
target)
0 0 0 C03.01 Property
This is a locally set target and
has been consistently achieved
over a number of years. 
23. % of
approved
applications
for
adaptations
completed in
year
(locally set
target)
100% 100% 100% 
SSHC 
C03.01 
Property
This target is a local target as
well as a statutory requirement
for the Scottish Housing
Regulator. This target has been
consistently achieved over the
past years.
24. Average time
(working
days) to
complete
applications
(nationally
set target)
28 days 23.49
days 28 days
SSHC 
03.01
Property
This target is a contractual
arrangement as well as a
statutory requirement for the
Scottish Housing Regulator. 
25. % of
standard
adaptations
to council
houses within
agreed
appointment
times
(nationally
set target)
92.4% 98.3% 90.0% C03.01 Property
This target is a contractual
arrangement as well as a
statutory requirement for the
Scottish Housing Regulator. 
26. % of new
build that
meets needs
of older
people
(locally set
target)
27% 20% N/A C03.01 Housing/
Property
No target set. Numbers
determined by need and
demand assessment.   
170

Page 171

11 
Resource Outcome:  Delivering the Plan and achieving best value
Measure 2020-21 2021-22 2022-23
Target Links Service Notes
27. % of Stage 1
complaints
responded to
in full
(nationally
set target)
93% 91% 100%
SSHC 
07.01
Housing/
Property 
Good performance against
target which is reported to the
Scottish Housing Regulator.
28. Average time
in working
days for a full
response at
Stage 1
(nationally
set target)
5 days 5 days 5 days
SSHC 
07.01
Housing/
Property
This is a locally set target as
well as a statutory requirement
for the Scottish Housing
Regulator.
29. % of Stage 2
complaints
responded to
in full
nationally set
target)
91% 100% 100%
SSHC 
07.01
Housing/
Property
The council performs well
against this statutory target
which   is reported to the
Scottish Housing Regulator. 
30. Average time
in working
days for a full
response at
Stage 2
(nationally
set target)
14 days 15 days 20 days
SSHC 
07.01
Housing/
Property
This is a locally set target as
well as a statutory requirement
for the Scottish Housing
Regulator.
31. Rent
collected as
a % of rent
due in the
year
(locally set
target)
97.4% 98.3% 98.76%
SSHC 
07.02
Housing
Performance in this area will
continue to be an area of focus
in the 2022/23 and monitored
and reported at a senior
management level. 
32. Gross rent
arrears
(current and
former
tenants) as a
% of rent due
for the year
(locally set
target)
8.26% 8.91% 9%
LGBF
SSHC 
07.02
Housing
Performance in this area will
continue to be an area of focus
in the forthcoming year and
monitored and reported at a
senior management level. 
33. % of rent due
in the year
that was lost
due to voids
(Operational
void rent
loss)
(locally set
target)
0.42% 0.6% 0.6% 
SSHC 
07.02 
Housing
Performance will continue to be
an area of focus in the
forthcoming year and monitored
and reported at a senior
management level. 
171

Page 172

12 
34. % of total
void rent loss
(locally set
target)
1.22% 1.53% 1.42%
SSHC 
07.02
Housing
Performance will continue to be
an area of focus in the
forthcoming year and monitored
and reported at a senior
management level as well as a
statutory requirement for the
Scottish Housing Regulator. 
35. Factoring
collection
rate
(locally set
target)
74.1% 73% 75% C07.02 Property Target set by Finance and
Corporate Resources. 
4.b. What actions we will take in 2022-23 
Resource Outcome: Continue to deliver an affordable housing programme to meet needs 
Action Milestones/Steps we will take to deliver our actions Links Service
1. Increase the number of
new affordable homes
Total new/additional affordable homes delivered per
SHIP and reported to H&TR Committee.
C05.10 Housing/
Property
2. Physical regeneration
work in priority areas
Remaining properties (Phase 3 of the masterplan) for
regeneration at Whitlawburn complete by end of March
2023.
05.10  Housing/
Property
Work with partners to bring 15 Long Term empty homes
into use by March 2023.
C05.10  Housing/
Property 
3. Increase supply of
housing suitable for
older people
All properties that are suitable, as identified at the void
stage, will be converted to Amenity standard. 
During the period of the SHIP 2022-2027, a total of 569
specialist provision properties are forecast to be
delivered across both SLC and RSL sites. 
C05.10 Housing/
Property
Resource Outcome:   Support people to access and sustain housing which meets their needs through
our Integrated Housing Option Service
Action Milestones/Steps we will take to deliver our actions Links Service
4. Understand the
financial security of
our customers 
Provide a programme of support to our customers
including – 
• The offer of tailored support to 100% of tenants who
go on to receive Universal Credit.
• Tenancy Sustainment Fund 
As part of rent setting process - 
• Complete analysis of the affordability of our rents by
December 2022.
Consult with tenants regarding proposed rent levels by
December 2022.
05.01 Housing
5. Development and
implement Local
Housing Strategy for
2022-27
Local Housing Strategy developed, consulted and
approved by Executive Committee in November 2022.
C05.01 Housing
A Housing Needs and Demand Assessment completed
by August 2022.
05.01 Housing
172

Page 173

13 
Resource Outcome:   Provide a comprehensive range of services to help prevent and alleviate
homelessness including the provision of suitable and temporary and supported
accommodation
Action Milestones/Steps we will take to deliver our actions Links Service
6. Improve access to
settled accommodation
for homeless
households 
Rapid Rehousing Transition Plan delivered including – 
Implement Housing First approach, provide suitable
accommodation and support for up to 40 individuals with
complex needs by 2022/23. 
Increase settled accommodation by converting 20 to 30
temporary accommodation units to Scottish Secure
Tenancies during 2022/23. 
We will continue to make progress towards our target of
converting up to 100 temporary accommodation units to
Scottish Secure tenancies by 2024. 
During 2022/23, reduce the overall homelessness
caseload from 900 to 850 and reduce long term
homelessness caseload by 10%. 
Reduce and maintain repeat instances of homelessness
to below 4.5% of all cases during 2022/23 (RRTP aim is
<3% over life of plan).
C05.02 Housing
Resource Outcome: Work with communities to create safe, strong sustainable places
Action Milestones/Steps we will take to deliver our actions Links Service
7. Community Safety
priorities including
relevant parts of the
SLCP are achieved
The Resource will administer a review of the Safer South
Lanarkshire Board and associated structure during
2022/23. This will aim to ensure reporting requirements
around police and fire scrutiny, anti-social behaviour and
community justice remain appropriate alongside links to
revised community planning priorities.
C01.01 Housing
Resource Outcome:   Continue to engage and work with tenants and other customers to design our
services
Action Milestones/Steps we will take to deliver our actions Links Service
8. Develop and
implement Customer
Involvement Strategy
Revised Customer Involvement Strategy to be
developed, consulted, and approved by Housing and
Technical Resources Committee 2023/24.
05.12 Housing
9. Ensure effective
involvement with
tenants and other
customer groups
Annual Scrutiny Programme 2022/23 developed August
2022 and implemented by March 2023. 
Customer Engagement Programme agreed with tenant
representatives by August 2022. 
C05.12 Housing
10.Service development
is informed by
understanding our
customer satisfaction
levels of key service
areas
Customer Satisfaction Programme developed and
approved by July 2022. 
Results are reviewed quarterly, and any improvement
activities are identified and incorporated into service and
resource planning cycles. 
SSHC 
05.12
Housing/
Property
173

Page 174

14 
Resource Outcome: Provide high quality services to our service to our tenants, including those who   
live in sheltered housing and residents at our Gypsy / Travellers sites 
Action Milestones/Steps we will take to deliver our actions Links Service
11.Work with
Gypsy/Traveller
residents to develop
and implement a
programme of site
improvement 
Site Investment Masterplans reviewed in consultation
with residents and planned improvement works for
progression during 2022 and current works completed by
31 March 2023.
C05.03 Housing
12.Ensure that Sheltered
housing services are
compliant with Care
Inspectorate inspection
standards
Complete Quality assurance checks to monitor and
ensure compliance with care inspectorate standards.
Each of the 34 sheltered housing complexes will be
checked during 2022/23 with findings of completed
checks reported on a quarterly basis.
C05.03  Housing
Resource Outcome: More energy efficient council homes 
Action Milestones/Steps we will take to deliver our actions Links Service
13. Improve energy
efficiency stock to
help address fuel
poverty
Deliver investment projects to increase energy efficiency
of housing stock during 2022/23.
C05.17 Property
Resource Outcome: Manage the council’s portfolio of properties and land 
Action Milestones/Steps we will take to deliver our actions Links Service
14. Project Management
of Schools Projects
and General Services
Projects
The General Services Programme spend will be
achieved for the financial year.
C05.11 Property
Two new nursery projects - Skylark, Larkhall to be
completed in 2022/23 and Clyde Terrace, Bothwell
commencing with completion date August 2023. 
05.11 Property
Resource Outcome: Improve the health and wellbeing of children, young people and families 
Action Milestones/Steps we will take to deliver our actions Links Service
15. Contribute to effective
joint working to
protect and promote
the wellbeing of
children, young
people and adults
100% of households identified as at risk are referred to
appropriate statutory agencies. 
04.04 Housing/
Property
Deliver key actions detailed in the Local Child Poverty
Action Report during 2022/23 within the following areas: 
• Reducing the costs of housing for families
including energy costs;
• Investment to increase new affordable housing
supply;
• Preventing and reducing homelessness for
households, including families with children and
young people
04.04 Housing
Implement the SHORE (Sustainable Housing on
Release for Everyone) standards, by providing
appropriate support to 80% of individuals leaving prison
with identified housing need.
04.04 Housing
100% of young people moving on from care offered
housing options appointment, and of those requiring
Housing Service assistance, 100% supported to move
04.04 Housing
174

Page 175

15 
onto suitable and sustainable housing via a personal
housing pathway plan.
Resource Outcome:   Help people to continue to live within their homes and communities through
integrated community health and social care services
Action Milestones/Steps we will take to deliver our actions Links Service
16. Ensure effective
contribution to health
and social care
outcomes contained
within the Strategic
Commissioning Plan
Implementation of agreed housing actions within SCP3
to be progressed throughout the duration of the SCP3.
C03.08 Housing
Resource Outcome: Delivering the plan and achieving best value
Action Steps we have taken to deliver our actions Links Service
17. Ensure effective
management of all
Resource budgets
and Business Plans
Overall budgetary target achieved by March 2023. 
07.02
Housing/
Property
18. Progress the council’s
Digital Strategy within
the Resource
Continue with phased implementation of new IT system. 
07.04
Housing/
Property
175

Page 176

16 
Section Five – Resourcing the Plan 
5.0. Introduction 
In this section we consider the resources needed to implement our plan, including funding and
staffing. 
5.1. Revenue Budget 2022-23
The Resource has a Net Revenue Budget of £13,175 for 2022-23. The table below
allocates this budget across the services: 
NET Budget by Service 2022-23
Detail £ million %
Housing Services 8,481 64%
Property Services 4,694 36%
Total 13,175 100% 
5.2. Capital Budget 2022-23
The following capital budget of £52.23 million is allocated to the Resource for 2022-23: 
Capital Programme 2022-23 
Project  £ million 
Housing Revenue Account (HRA) Capital (new projects)  52.23 
Total  52.23 
5.3. Resource Employees 
The Resource has 1442 employees as at March 2022. We support these employees to
deliver their duties through a range of policies including personal appraisal and a robust
training framework.   
The number of employees (per headcount) by service is as follows:
Service Number of
employees 
Housing Services  471 
Property Services  971 
Total  1442 
176

Page 177

Appendix 2  
The Resource has established a number of objectives to support the delivery of the Connect
priorities in 2022-23. 
Connect Outcomes Resource Outcomes
Communities and
Environment
• Work with communities to create safe, strong
sustainable places
Health and Wellbeing • Support people to live active and
independent lives
• Help people to continue to live within their
homes and communities through integrated
community health and social care services
Children and Young
People
• Improve the health and wellbeing of children,
young people and families
Housing and Land • Support people to access and sustain
housing which meets their needs through our
Integrated Housing Options service
• Provide a comprehensive range of services
to help prevent and alleviate homelessness
including the provision of suitable temporary
and supported accommodation
• Continue to deliver an affordable housing
programme to meet needs
• Manage the council’s portfolio of properties
and land
• Ensure our repairs service continues to meet
the needs of customers
• More energy efficient council homes
• Continue to engage and work with tenants
and other customers to design our services
• Provide high quality services to our service
to our tenants, including those who live in
sheltered housing and residents at our
Gypsy / Travellers sites 
15
177