Agenda Document Pack - Housing and Technical Resources Committee - 10/08/2022

South Lanarkshire Council · 10 August 2022
Back to Housing and Technical Resources Committee — 10 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 02 August 2022 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 10 August 2022
Time:  10:00
Venue: Hybrid - Council Chamber, 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Davie McLachlan (Chair), Martin Lennon (Depute Chair), Joe Fagan (ex officio), John
Bradley, Walter Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry
Convery, Margaret Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer,
Grant Ferguson, Alistair Fulton, Ross Gowland, Geri Gray, Lynsey Hamilton, Ross Lambie,
Richard Lockhart, Julia Marrs, Ian McAllan, Kenny McCreary, Norman Rae, David Shearer 
Substitutes
Robert Brown, Poppy Corbett, Cal Dempsey, Gladys Ferguson-Miller, Martin Hose, Gavin
Keatt, Eileen Logan, Monique McAdams, Richard Nelson, Dr Ali Salamati, Helen Toner,
Margaret B Walker, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
Monitoring Item(s) 
2 Revenue Budget Monitoring 2021/2022 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 28 June 2022 by the Executive Director (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
5 - 10 
3 Revenue Budget Monitoring 20212022 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 29 June 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
11 - 14 
4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 6 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
15 - 20 
5 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
- Housing Revenue Account (HRA)
Joint report dated 6 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
21 - 24 
6 Capital Budget Monitoring 20212022 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 20 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy
attached) 
25 - 28 
7 Capital Budget Monitoring 2021/2022 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 7 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
29 - 32 
8 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(excl Housing Revenue Account (HRA))
Joint report dated 20 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
33 - 36 
9 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 6 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
37 - 40
2

Page 3

10  Housing and Technical Resources – Workforce Monitoring – April to May
2022
Joint report dated 5 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
41 - 48 
Item(s) for Decision 
11  Annual Review of the South Lanarkshire Rapid Rehousing Transition Plan
2021/2022
Report dated 29 June 2022 by the Executive Director (Housing and Technical
Resources.  (Copy attached) 
49 - 98 
12  Housing Allocation Policy – Medical Assessment
Joint report dated 15 July 2022 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
99 - 102 
13  Disposal of Vacant Domestic Dwelling House at 1 Newhousemill Cottages,
Newhousemill Road, East Kilbride G74 2LD
Report dated 7 July 2022 by the Executive Director (Housing and Technical
Resources.  (Copy attached) 
103 - 106 
Item(s) for Noting 
14  Notification of Contracts Awarded - 1 November 2021 to 30 June 2022
Report dated 8 July 2022 by the Executive Director (Housing and Technical
Resources.  (Copy attached) 
107 - 114 
15  Delegated Authority Report - Update
Report dated 4 July 2022 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
115 - 120 
Urgent Business 
16  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2021/2022 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2021 to 31 March 2022 for Housing and Technical
Resources (excl HRA).
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the overspend of £0.939m as at 31 March 2022 on Housing and
Technical Resources (excl HRA) revenue budget, as detailed in Appendix A
of the report, be noted
(2) that the proposed budget virements, be approved
[1recs]
3. Background
3.1. This is the fourth revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2021/2022. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) in Appendix A, then details the individual services in Appendices B and C and
outlines the additional COVID-19 costs, in Appendix D. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 31 March 2022, there is a overspend of £0.939m against the phased budget. 
5.2. The overspend is caused by additional expenditure in relation to the COVID-19
response including additional expenditure for temporary accommodation costs for
homeless people. 
5.3. As previously reported, the COVID-19 lockdown has had an impact on the Property
Services section which provides the property investment, repairs and maintenance
service to the HRA and other resources capital and revenue budgets. The section
incurred non variable costs which required to be offset by income recovery, therefore
a recharge has been made to these budgets to cover fixed costs.
2
5

Page 6

6. Other Implications
6.1. The main risk associated with the Council’s revenue budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through 4-weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
28 June 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 29 June 2022.
 Housing & Technical Committee, 8 December 2021. 
List of Background Papers
 Financial ledger and budget monitoring results to 31 March 2022. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager
Ext:  2699  (Tel:  01698 452699)
E-mail:  Hazel.Goodwin@southlanarkshire.gov.uk
6

Page 7

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2022 (No.14) 
Housing and Technical Resources Summary (excl HRA)                  
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
31/03/22
Actual
31/03/22
Variance
31/03/22 
%
Variance
31/03/22 Notes              
Budget Category              
Employee Costs 43,646  43,935  (289) (289) 43,646  43,766  (120) over (0.3%) 
Property Costs 19,903  21,853  (1,950) (1,950) 19,903  20,871  (968) over (4.9%) 
Supplies & Services 14,201  11,181  3,020  3,020  14,201  10,953  3,248  under 22.9% 
Transport & Plant 4,586  4,068  518  518  4,586  3,993  593  under 12.9% 
Administration Costs 3,602  3,660  (58) (58) 3,602  3,740  (138) over (3.8%) 
Payments to Other Bodies 9,260  9,101  159  (130) 9,260  8,832  428  under 4.6% 
Payments to Contractors 18,589  13,079  5,510  5,510  18,589  12,981  5,608  under 30.2% 
Transfer Payments 0  0  0  0  0  0  0  - 0.0% 
Financing Charges 155  158  (3) (3) 155  185  (30) over (19.4%) 
Total Controllable Exp. 113,942  107,035  6,907  6,618  113,942  105,321  8,621  under 7.6% 
Total Controllable Inc. (95,801) (88,165) (7,636) (7,636) (95,801) (86,639) (9,162) under
recovered (9.6%) 
Net Controllable Exp. 18,141  18,870  (729) (1,018) 18,141  18,682  (541) over 3.0% 
Transfer to Reserves as
at (31/03/22) 0  0  (289) 0  0  398  (398) under
recovered   
Position After Transfers
to Reserves (31/03/22) 18,141  18,870  (1,018) (1,018) 18,141  19,080  (939) over 5.2% 
Variance Explanations 
Variances are shown in Appendix B to D as appropriate. 
Budget Virements 
Virements are shown in Appendix B to D as appropriate.
7

Page 8

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2022 (No.14) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
31/03/22
Actual
31/03/22
Variance
31/03/22 
%
Variance
31/03/22 Notes              
Budget Category              
Employee Costs 2,565  2,591  (26) (26) 2,565  2,622  (57) over (2.2%) 1, a
Property Costs 5,673  6,005  (332) (332) 5,673  6,214  (541) over (9.5%) 2, b
Supplies & Services 113  111  2  2  113  56  57  under 50.4% 3
Transport & Plant 105  66  39  39  105  57  48  under 45.7% 
Administration Costs 157  151  6  6  157  156  1  under 0.6% 
Payments to Other Bodies 4,449  4,335  114  114  4,449  4,240  209  under 4.7% 4
c,d,e
Payments to Contractors 2,583  2,324  259  259  2,583  2,407  176  under 6.8% 4
Transfer Payments 0  0  0  0  0  0  0  - 0.0% 
Financing Charges 11  14  (3) (3) 11  17  (6) over (54.5%) 
Total Controllable Exp. 15,656  15,597  59  59  15,656  15,769  (113) over (0.7%) 
Total Controllable Inc. (6,760) (6,655) (105) (105) (6,760) (6,908) 148  over
recovered 2.2% 5, e
Net Controllable Exp. 8,896  8,942  (46) (46) 8,896  8,861  35  under (0.4%) 
Transfer to Reserves as
at (31/03/22) 0  0  0  0  0  0  0  -   
Position After Transfers
to Reserves (31/03/22) 8,896  8,942  (46) (46) 8,896  8,861  35  under (0.4%) 
Variance Explanations 
1. The variance in Employee Costs relates to delayed implementation of the Community Warden saving managed within the service.
2. The overspend relates to the cost for Homelessness temporary accommodation to meet current demand. This is managed within the overall service.
3. The underspend in Supplies & Services relates to an underspend in CCTV equipment in Problem Solving and manages the Employee Costs overspend
within the Community Warden service. 
4. The underspend relates to commissioned services in the  Homelessness budget and manages the overspend in property costs. Actual expenditure
varies according to service requirements, a budget realignment is required for future years. 
5. The over recovery relates to the income for Homelessness temporary accommodation based on current levels and covers costs within the service. 
Budget Virements 
a. Transfer of additional pay award £0.019m and Apprentice Levy £0.011m: £0.030m Employee Costs.
b. Transfer of Efficiency saving in physio charges net (£0.003m): (£0.003m) Property Costs.
c. Transfer from Reserves for Homelessness RRTP allocation from prior year net £0.372m: £0.372m Payments to Other Bodies.
d. Transfer of Living Wage allocation for support contracts net £0.037m: £0.037m Payments to Other Bodies.
e. Transfer from Reserves for Homelessness general reserve allocation from prior year net £0.226m: (£0.029m) Payments to Other Bodies, Income
£0.255m. 
8

Page 9

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2022 (No.14)  
Property Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
31/03/22
Actual
31/03/22
Variance
31/03/22 
%
Variance
31/03/22 Notes              
Budget Category              
Employee Costs 41,081  41,344  (263) (263) 41,081  41,131  (50) over (0.1%) 1 a
Property Costs 14,230  14,455  (225) (225) 14,230  13,647  583  under 4.1% 2 b
Supplies & Services 14,088  11,047  3,041  3,041  14,088  10,888  3,200  under 22.7% 3
Transport & Plant 4,481  4,002  479  479  4,481  3,925  556  under 12.4% 4 c,d
Administration Costs 3,445  3,509  (64) (64) 3,445  3,580  (135) over (3.9%) 5
Payments to Other Bodies 4,388  4,088  300  11  4,388  3,945  443  under 10.1% 6 e,f
Payments to Contractors 16,006  10,755  5,251  5,251  16,006  10,573  5,433  under 33.9% 7
Transfer Payments 0  0  0  0  0  0  0  - 0.0% 
Financing Charges 144  144  0  0  144  168  (24) over (16.7%) 
Total Controllable Exp. 97,863  89,344  8,519  8,230  97,863  87,857  10,006  under 10.2% 
Total Controllable Inc. (89,041) (80,857) (8,184) (8,184) (89,041) (79,398) (9,643) under
recovered (10.8%) 8 a,g
Net Controllable Exp. 8,822  8,487  335  46  8,822  8,459  363  under (4.1%) 
Transfer to Reserves as
at (31/03/22) 0  0  (289) 0  0  398  (398) over   
Position After Transfers
to Reserves (31/03/22) 8,822  8,487  46  46  8,822  8,857  (35) over 0.4% 
Variance Explanations 
1. The variance in Employee Costs relates in the main to vacancies which are actively being recruited or are still under consideration whilst service
requirements are determined. This offsets an overspend due to the need for overtime to meet current levels of service demand.
2. Covid-19 restrictions has impacted on the level of security and refuse uplifts needed. This varies depending on the current workload demands and timing
of works on a wide variety of capital and revenue works.
3. Covid-19 restrictions has impacted on the level of materials required. This varies depending on the current workload demands and timing of works on a
wide variety of capital and revenue works. 
4. Covid-19 restrictions have impacted on the level of Plant required. This varies depending on the current workload demands and timing of works on a
wide variety of capital and revenue works. 
5. This is a combination of minor overspends in relation to administration costs including increased use of mobile telephones.
6. This reflects the current level of demand for owners grants relating to the participation in the Housing Investment projects. This demand will have been
partially impacted by COVID-19.
7. Covid-19 restrictions have impacted on the level of Sub Contractors required. This varies depending on the current workload demands and timing of
works on a wide variety of capital and revenue works.
8. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. Covid-19 restrictions has had an impact on the level of income recovered as can be seen from the net underspends above. The service
continues to incur non variable costs which require to be offset by income recovery, therefore a final recharge is required to Resources revenue and
capital budgets to cover these fixed costs. 
Budget Virements 
a. Transfer of additional pay award £0.076m and Apprentice Levy £0.157m overall net £0.233m: £0.545m Employee Costs, Income (£0.312m)
b. Transfer of additional utilities funding from RHI net £0.111m: £0.111m Property Costs.
c. Realignment of Central Support budget net (£0.052m): Administration (£0.160m), Income £0.108m
d. Transfer of Efficiency saving in physio charges net (£0.023m): (£0.023m) Administration.
e.  Care and Repair expenditure and income realignment net £0.000m : Payments to Other Bodies £0.214m, Income (£0.214m)
f. Transfer of Community Investment budget for use in future years net (£0.013m): (£0.013m) Payments to Other Bodies.
g. Office Accommodation income realignment for dilapidations one off net (£0.315m) : Income (£0.315m) 
9

Page 10

Appendix D 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2022 (No.14) 
Housing and Technical Resources Summary (excl HRA) - Covid-19 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
31/03/22
Actual
31/03/22
Variance
31/03/22 
%
Variance
31/03/22 Notes              
Budget Category              
Employee Costs 0  0  0  0  0  13  (13) over 0.0% 
Property Costs 0  1,393  (1,393) (1,393) 0  1,010  (1,010) over 0.0% 1
Supplies & Services 0  23  (23) (23) 0  9  (9) over 0.0% 
Transport & Plant 0  0  0  0  0  11  (11) over 0.0% 
Administration Costs 0  0  0  0  0  4  (4) over 0.0% 
Payments to Other Bodies 423  678  (255) (255) 423  647  (224) over (53.0%) 1, a
Payments to Contractors 0  0  0  0  0  1  (1) over 0.0% 
Transfer Payments 0  0  0  0  0  0  0  - 0.0% 
Financing Charges 0  0  0  0  0  0  0  - 0.0% 
Total Controllable Exp. 423  2,094  (1,671) (1,671) 423  1,695  (1,272) over (300.7%) 
Total Controllable Inc. 0  (653) 653  653  0  (333) 333  over
recovered 0.0% 1
Net Controllable Exp. 423  1,441  (1,018) (1,018) 423  1,362  (939) over 222.0% 
Transfer to Reserves as
at (31/03/22) 0  0  0  0  0  0  0  -   
Position After Transfers
to Reserves (31/03/22) 423  1,441  (1,018) (1,018) 423  1,362  (939) over 222.0% 
Variance Explanations 
1. The majority of this is additional expenditure and income for temporary accommodation costs for homeless people.  
Budget Virements 
a.   Tenancy Sustainment Funding Income net £0.423m: Payments to Other Bodies £0.423m.
10

Page 11

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2021/2022 - Housing and
Technical Resources - Housing Revenue Account (HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2021 to 31 March 2022 for Housing and Technical
Resources (HRA).
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements, be approved.
1recs]
3. Background
3.1. This is the fourth revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2021/2022. 
3.2. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 31 March 2022, there is a breakeven position against the phased budget. 
5.2 The COVID-19 lockdown has had an impact on the Property Services section which
provides the property repairs and maintenance service to the HRA. The section
continues to incur non variable costs which require to be offset by income recovery,
therefore a recharge to HRA revenue budget was required at year-end to cover a
share of these fixed costs. 
6. Other Implications
6.1. The main risk associated with the Council’s revenue budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources.   
3
11

Page 12

The risk is managed through 4-weekly Budget Monitoring Meetings at which any
variance is analysed. In addition, the probable outturn exercise ensures early
warning for corrective action to be taken where appropriate. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
29 June 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 29 June 2022.
 Housing & Technical Committee, 8 December 2021. 
List of Background Papers
 Financial ledger and budget monitoring results to 31 March 2022. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager
Ext:  2699  (Tel:  01698 452699)
E-mail:  Hazel.Goodwin@southlanarkshire.gov.uk
12

Page 13

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2022 (No.14) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
31/03/22
Actual
31/03/22
Variance
31/03/22 
%
Variance
31/03/22 Notes              
Budget Category              
Employee Costs 14,090  13,842  248  248  14,090  13,957  133  under 0.9% 1
Property Costs 46,061  46,666  (605) (605) 46,061  46,893  (832) over (1.8%) 2 a,b
Supplies & Services 879  841  38  38  879  701  178  under 20.3% 3
Transport & Plant 195  167  28  28  195  153  42  under 21.5% 
Administration Costs 5,645  5,633  12  12  5,645  5,485  160  under 2.8% 4
Payments to Other Bodies 3,076  3,113  (37) (37) 3,076  3,130  (54) over (1.8%) 5 b
Payments to Contractors 100  97  3  3  100  69  31  under 31.0% 
Transfer Payments 0  0  0  0  0  0  0  - 0.0% 
Financing Charges 19,637  19,662  (25) (25) 19,637  19,744  (107) over (0.5%) 6                     
Total Controllable Exp. 89,683  90,021  (338) (338) 89,683  90,132  (449) over (0.5%) 
Total Controllable Inc. (106,485) (106,823) 338  338  (106,485) (108,765) 2,280  over
recovered 2.1% 7 a
Transfer to/(from) Balance
Sheet 971  971  0  0  971  2,917  (1,946) under
recovered 200.4% 8 c
Net Controllable Exp. (15,831) (15,831) 0  0  (15,831) (15,716) (115) over (0.7%) 
Loan Charges 15,831  15,831  0  0  15,831  15,716  115  over
recovered   9 c
Net Controllable Exp. 0  0  0  0  0  0  0  - 0.0% 
Variance Explanations 
1. The variance in Employee Costs is due to higher than anticipated staff turnover.
2. The net overspend reflects a reduction in repairs and maintenance during the various periods of lockdown throughout the year, offset by an increase in
demand when restrictions eased and for the level of void work required. The position includes the agreed recharge from Property Services for downtime
during the COVID-19 lockdown. This was partly offset by a lower than budgeted level of bad debt provision. During the year collection rates for rental
income have been better than forecast, which is due in part to schemes such as the tenancy sustainment fund mitigating the overall level of debt. This
underspend is used to manage the additional repairs and voids expenditure in the current year.
3.  This underspend reflects slippage in milestone payments for the new IT system which is under development. The funding will be carried forward into a
future year to complete the project.
4. A large element of this underspend is due to demand led legal expenses and the underspend reflects the current level of court action. This also reflects a
reduced charge in relation to efficiency savings made within central support departments 
5. This overspend reflects the costs of our contracted services for tenant scrutiny participation and is managed within the overall budget.
6. The IT leasing budget has been impacted by changing demands post Covid-19 and realignment of budget is required in future years to manage this
pressure. The interest on revenue balances is impacted by the levels held and interest rates and is lower than budget.
7. This over recovery is a combination of additional one off funding including insurance, funded posts, energy funding and rental income due to the timing
of new build completions.  
8. The net combined underspend at year end date allows for a higher than budgeted level of transfer to reserves.
9. The overall level of debt charges was lower than anticipated due to the profile of funding requirements. 
Virements 
a.  The estimated expenditure and income for owner occupier energy efficiency measures was adjusted to reflect the revised annual demand levels - net
£0.000m: Property Costs (£1.860m) and Income £1.860m.
b. An allocation of £0.100m was transferred from Bad Debt Provision to allow for Tenancy Sustainment measures - net £0.000m: Property Costs (£0.100m)
and Payments to Other Bodies £0.100m.
c. The estimated expenditure on Loan Charges is amended to better reflect the profile of funding requirements - net £0.000m: Loan Charges (£1.810m)
and Transfer to/(from) Balance Sheet £1.810m. 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 20 May 2022 for Housing and Technical
Resources (excl HRA).
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position as at 20 May 2022 on Housing and Technical
Resources (excl HRA) revenue budget, as detailed in Appendix A of the
report, be noted; and
(2) that the proposed budget virements be approved
[1recs]
3. Background
3.1. This is the first revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) in Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 20 May 2022, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s revenue budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through 4-weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
4
15

Page 16

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
6 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 29 June 2022. 
List of Background Papers
 Financial ledger and budget monitoring results to 20 May 2022. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager
Ext:  2699  (Tel:  01698 452699)
E-mail:  Hazel.Goodwin@southlanarkshire.gov.uk
16

Page 17

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 20 May 2022 (No.2) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
20/05/22
Actual
20/05/22
Variance
20/05/22 
%
Variance
20/05/22 Notes            
Budget Category            
Employee Costs 43,888  43,888  0  5,044  4,943  101  under 2.0% 
Property Costs 19,725  19,725  0  3,487  3,457  30  under 0.9% 
Supplies & Services 14,145  14,145  0  1,377  1,285  92  under 6.7% 
Transport & Plant 4,584  4,584  0  616  479  137  under 22.2% 
Administration Costs 3,748  3,748  0  459  448  11  under 2.4% 
Payments to Other Bodies 8,014  8,014  0  649  649  0  - 0.0% 
Payments to Contractors 18,756  18,756  0  1,176  1,156  20  under 1.7% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  154  0  14  7  7  under 50.0% 
Total Controllable Exp. 113,014  113,014  0  12,822  12,424  398  under 3.1% 
Total Controllable Inc. (95,726) (95,726) 0  (10,157) (9,759) (398) under
recovered (3.9%) 
Net Controllable Exp. 17,288  17,288  0  2,665  2,665  0  - 0.0% 
Transfer to Reserves as
at (20/05/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (20/05/22) 17,288  17,288  0  2,665  2,665  0  - 0.0% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate.
17

Page 18

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 20 May 2022 (No.2) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
20/05/22
Actual
20/05/22
Variance
20/05/22 
%
Variance
20/05/22 Notes            
Budget Category            
Employee Costs 2,344  2,344  0  272  275  (3) over (1.1%) 
Property Costs 5,593  5,593  0  1,785  1,783  2  under 0.1% 
Supplies & Services 84  84  0  6  0  6  under 100.0% 
Transport & Plant 96  96  0  15  9  6  under 40.0% 
Administration Costs 144  144  0  20  20  0  - 0.0% 
Payments to Other Bodies 4,028  4,028  0  380  380  0  - 0.0% 
Payments to Contractors 2,750  2,750  0  0  0  0  - 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  11  0  3  0  3  under 100.0% 
0  0  0  0  0  0      
Total Controllable Exp. 15,050  15,050  0  2,481  2,467  14  under 0.6% 
Total Controllable Inc. (6,569) (6,569) 0  (546) (532) (14) under
recovered (2.6%) 
Net Controllable Exp. 8,481  8,481  0  1,935  1,935  0  - 0.0% 
Transfer to Reserves as
at (20/05/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (20/05/22) 8,481  8,481  0  1,935  1,935  0  - 0.0% 
Variance Explanations 
None. 
Budget Virements 
None. 
18

Page 19

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 20 May 2022 (No.2)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
20/05/22
Actual
20/05/22
Variance
20/05/22 
%
Variance
20/05/22 Notes            
Budget Category            
Employee Costs 41,544  41,544  0  4,772  4,668  104  under 2.2% 1
Property Costs 14,132  14,132  0  1,702  1,674  28  under 1.6% a
Supplies & Services 14,061  14,061  0  1,371  1,285  86  under 6.3% 2
Transport & Plant 4,488  4,488  0  601  470  131  under 21.8% 3
Administration Costs 3,604  3,604  0  439  428  11  under 2.5% 
Payments to Other Bodies 3,986  3,986  0  269  269  0  - 0.0% b, c
Payments to Contractors 16,006  16,006  0  1,176  1,156  20  under 1.7% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143  143  0  11  7  4  under 36.4% 
Total Controllable Exp. 97,964  97,964  0  10,341  9,957  384  under 3.7% 
Total Controllable Inc. (89,157) (89,157) 0  (9,611) (9,227) (384) under
recovered (4.0%) 4
Net Controllable Exp. 8,807  8,807  0  730  730  0  - 0.0% 
Transfer to Reserves as
at (20/05/22) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (20/05/22) 8,807  8,807  0  730  730  0  - 0.0% 
Variance Explanations 
1. The variance in Employee Costs relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are
determined.
2. The expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
3. The use of plant and equipment varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
4. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
a. Additional planned maintenance funding from CFCR net £3.000m: £3.000m Property Costs.
b. Transfer from CFCR in respect of Private Sector Housing Scheme of Assistance. Net Effect £1.000m: Payment to Other Bodies £1.000m.
c. Transfer of Community Investment budget from reserves net £0.113m: £0.113m Payments to Other Bodies. 
19

Page 20

20

Page 21

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources - Housing Revenue Account
(HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 20 May 2022 for Housing and Technical
Resources (HRA)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report, be noted
1recs]
3. Background
3.1. This is the first revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 20 May 2022, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s revenue budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through 4-weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.  
5
21

Page 22

8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
6 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 29 June 2022. 
List of Background Papers
 Financial ledger and budget monitoring results to 20 May 2022. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager
Ext:  2699  (Tel:  01698 452699)
E-mail:  Hazel.Goodwin@southlanarkshire.gov.uk
22

Page 23

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 20 May 2022 (No.2) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
20/05/22
Actual
20/05/22
Variance
20/05/22 
%
Variance
20/05/22 Notes            
Budget Category            
Employee Costs 13,914  13,914  0  1,575  1,584  (9) over (0.6%) 
Property Costs 46,906  46,906  0  6,684  6,693  (9) over (0.1%) 
Supplies & Services 609  609  0  23  26  (3) over (13.0%) 
Transport & Plant 195  195  0  23  19  4  under 17.4% 
Administration Costs 5,644  5,644  0  893  881  12  under 1.3% 
Payments to Other Bodies 3,030  3,030  0  301  301  0  - 0.0% 
Payments to Contractors 100  100  0  17  21  (4) over (23.5%) 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 26,050  26,050  0  3,283  3,283  0  - 0.0% 
Total Controllable Exp. 96,448  96,448  0  12,799  12,808  (9) over (0.1%) 
Total Controllable Inc. (112,000) (112,000) 0  (9,933) (9,925) (8) under
recovered (0.1%) 
Transfer to/(from) Balance
Sheet (2,773) (2,773) 0  (462) (479) 17  over
recovered 3.7% 
Net Controllable Exp. (18,325) (18,325) 0  2,404  2,404  0  - 0.0% 
Loan Charges 18,325  18,325  0  0  0  0  -   
Net Controllable Exp. 0  0  0  2,404  2,404  0  - 0.0% 
Variance Explanations 
None 
Virements 
None 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2021/2022 - Housing and
Technical Resources (excl Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl HRA) for the period 1 April 2021 to 31 March 2022.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources (excl HRA) capital programme of  
£6.801 million and expenditure for the year of £5.484 million, be noted.
[1recs]
3. Background
3.1. This is the final capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2021/2022. 
3.2. As noted in the last report to this Committee (8 December 2021), the budget for
Housing and Technical Resources for financial year 2021/2022, including carry
forward, was £8.146 million.   
3.3. Since that meeting, the Executive Committee (2 February 2022) has also agreed
changes to the Housing and Technical Resources Capital Programme totalling a net
decrease of £1.345 million.  The details are shown in Appendix A.  This takes the
Housing and Technical Resources programme for 2021/2022 to £6.801 million.   
3.4. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. 2021/2022 Capital Programme – Final Position
4.1. As detailed in Section 3.3, the revised capital programme for Housing and Technical
Resources for 2021/2022 was £6.801 million.  Total expenditure to 31 March 2022
was £5.484 million, a difference of £1.317 million on the programme of £6.801
million.  
6
25

Page 26

4.2. The programme underspend of £1.317 million is mainly due to the timing of project
spend on a number of projects within multi-year programmes.  The main projects
which are responsible for the underspend are: Prioritised Urgent Investment
(£0.249m), Lifecycle Replacement Schools (£0.246m), Community Facilities Fund
(£0.100m), Civic Centre Fabric Upgrade (£0.317m) and Central Energy Efficiency
Fund (£0.367m) along with other minor movements. 
4.3. Any underspend on these projects, along with the funding, will carry forward into next
financial year as required.  An update on the 2022/2023 programme is detailed in a
separate report to this Committee.     
4.4. While sections 4.1 to 4.3 detail the position on the capital programme as set,
Accounting Regulations mean that adjustments are required to report spend
correctly as either capital or revenue for the purposes of publishing our Annual
Accounts.  This includes where spend is in relation to assets that are not owned by
the Council and where the spend must be classed as revenue.  There is no
operational impact for projects from this adjustment, it is an accounting entry only.   
4.5. £0.036 million of capital spend is required to be recorded as revenue spend.  This
transfer means that, for the purpose of publishing our Annual Accounts only, there is
capital spend of £5.448 million.   
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s capital programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment Management Meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
26

Page 27

20 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 8 December 2021
 Executive Committee, 2 February 2022 
List of Background Papers
 Financial ledger to 31 March 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 
27

Page 28

Appendix A 
South Lanarkshire Council
Capital Expenditure 2021-2022
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2021 – 31 March 2022 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Anticipated
Spend
£000
Actual
Expenditure
£000 
Office Accommodation 7,828 (455) (1,480) 5,893 5,893 4,943 
Private Housing Scheme of
Assistance 0 0 0 0 0 0 
Other Housing 559 349 0 908 908 541 
TOTAL 8,387 (106) (1,480) 6,801 6,801 5,484 
Accounting Adjustments     
Less Transfers to Revenue      (36)  
Add Transfers to Capital      -  
2021/22 Outturn Position
(Accounting Basis Only)     
5,448 
For Information Only  
Budget Adjustments approved by Executive Committee 2 February 2022: 
Budget Adjustments 
Prioritised Urgent Investment Fund 
Prioritised Urgent Investment Fund – Law Football Pavilion Upgrade and
drainage to Sports Pitches
Principal Offices – Fabric and Service Investment
Total Budget Adjustments             
(£0.680m)
(£0.015m) 
(£0.650m)   
(£1.345m)   
28

Page 29

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2021/2022 - Housing and
Technical Resources (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April 2021 to 31 March 2022.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs
(1) that the revised Housing and Technical Resources (HRA) capital programme
of £79.640 million and expenditure to 31 March 2022 of £73.181 million, be
noted.
[1recs]
3. Background
3.1. This is the fourth capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2021/2022.   
3.2. As noted in the report to the Committee on 29 September 2021, the budget for the
revised programme for Housing & Technical Resources is £79.640 million.   
3.3. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing capital programme for 2021/2022 totals £79.640 million and is detailed
along with the funding sources at Appendix A to this report. 
5.2. The actual expenditure on the Housing programme was £73.181 million, a net
underspend of £6.459 million. The delivery of the Housing capital programme for
2021/2022 has been affected by the pandemic. Part of this underspend relates to the
New Housing Supply Programme and this was due to the volume of buy backs,
which was lower than targeted levels due to current market conditions. The
remainder of the underspend relates to our ongoing investment in stock, which has
been affected by the Covid-19 restrictions    
7
29

Page 30

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s capital programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment management meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
7 July 2022 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, Effective, Efficient and Transparent 
Previous References
▪ Executive Committee, 23 June 2021
▪ Executive Committee, 22 September 2021 
▪ Executive Committee, 1 December 2021
▪ Executive Committee, 29 June 2022
▪ Housing & Technical Committee, 17 February 2021
▪ Housing & Technical Committee, 5 May 2021
▪ Housing & Technical Committee, 30 June 2021
▪ Housing & Technical Committee, 29 September 2021
▪ Housing & Technical Committee, 8 December 2021 
List of Background Papers
▪ Financial ledger to 31 March 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  hazel.goodwin@southlanarkshire.gov.uk
30

Page 31

South Lanarkshire Council       Appendix A
Housing Capital Programme 2021/22
As at 31 March 2022 
£m £m
Anticipated Capital Expenditure 2021/22   79.640
Estimated Financing Position 2021/22   
Capital Receipts  0.000  
Capital Financed From Current Revenue 19.637  
Prudential Borrowing 50.532  
Specific Grant – Scottish Government New Council Houses 7.191  
Specific Grant – Scottish Government Buy Backs 2.160  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
79.640 
Actual Expenditure to 31 March 2022  73.181 
Actual Financing Position to 31 March 2022   
Capital Receipts  1.537  
Capital Financed From Current Revenue 19.637  
Prudential Borrowing 39.942  
Specific Grant – Scottish Government New Council Houses 6.235  
Specific Grant – Scottish Government Buy Backs 1.995  
Specific Grant – Scottish Government Mortgage to Rent 0.056  
Other Income 3.779        
73.181 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (excl Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl HRA) for the period 1 April 2022 to 20 May 2022.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources (excl HRA) capital programme of  
£8.125 million and expenditure to date of £0.061 million, be noted.
[1recs]
3. Background
3.1. This is the first capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023.  Further reports will follow
throughout the year. 
3.2. The budget of £8.125 million for Housing and Technical Resources is based on the
overall capital programme for 2022/2023, which was approved by the Executive
Committee on 29 June 2022.   
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. The total capital programme for Housing and Technical Resources is £8.125 million.  
This budget is based on the original programme of projects approved by the Council
in February 2022, updated to include budget carried forward from financial year
2021/2022 as well as additional funding received and used to fund expenditure
incurred in 2021/2022.   
5.2. As has been the case in previous years, it has been identified that to comply with
accounting rules, some project expenditure should be reported through the revenue
budget as it cannot be classed as capital.  Budget of £4 million has been transferred
to Housing and Technical Resources’ revenue budget, along with the relevant
funding for Private Housing Scheme of Assistance project (£1 million) and £3 million
8
33

Page 34

of the Planned Asset Management budget.  In relation to Planned Asset
Management, the total overall budget across capital and revenue, remains at £4.800
million.  This will continue to be reviewed to ensure that it is classed appropriately
(as revenue or capital) and any further movement reported to a future meeting. 
These accounting adjustments are included in the programme of £8.125 million. 
5.3. The position for period 2 is anticipated spend to date of £0.061 million and spend to
20 May 2022 amounts to £0.061 million.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s capital programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment Management Meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
20 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council (Special), 23 February 2022 
 Executive Committee, 29 June 2022 
List of Background Papers
 Financial ledger to 20 May 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 
34

Page 35

Appendix A 
South Lanarkshire Council
Capital Expenditure 2022-2023
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2022 – 20 May 2022 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000 
Office Accommodation 7,758 0 0 7,758  61 61 
Private Housing Scheme
of Assistance 0 0 0 0  0 0 
Other Housing 367 0 0 367  0 0 
TOTAL 8,125 0 0 8,125  61 61 
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April 2022 to 20 May 2022.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources (HRA) capital programme
of £52.230 million and expenditure of £3.289 million, be noted.
[1recs]
3. Background
3.1. This is the first capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023.   
3.2. The budget is based on the capital programme for the year, which was presented to
the Executive Committee on 29 June 2022.   
3.3. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing capital programme for 2022/2023 totals £52.230 million and is detailed
along with the funding sources at Appendix A to this report. 
5.2. The Resource is expecting to spend to this level, work will continue in the coming
months to monitor achievable spend.    
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9
37

Page 38

7. Other Implications
7.1. The main risk associated with the Council’s capital programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment Management Meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
6 July 2022 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, Effective, Efficient and Transparent 
Previous References
▪ Executive Committee, 29 June 2022 
List of Background Papers
▪ Financial ledger to 20 May 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Hazel Goodwin, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  hazel.goodwin@southlanarkshire.gov.uk
38

Page 39

South Lanarkshire Council       Appendix A
Housing Capital Programme 2022/23
As at 20 May 2022 
£m £m
Anticipated Capital Expenditure 2022/23   52.230
Estimated Financing Position 2022/23   
Capital Receipts  0.000  
Capital Financed From Current Revenue 26.050  
Prudential Borrowing 22.018  
Specific Grant – Scottish Government New Council Houses 2.242  
Specific Grant – Scottish Government Buy Backs 1.800  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
52.230 
Actual Expenditure to 20 May 2022  3.289 
Actual Financing Position to 20 May 2022   
Capital Receipts  0.007  
Capital Financed From Current Revenue 3.282  
Prudential Borrowing 0.000  
Specific Grant – Scottish Government New Council Houses 0.000  
Specific Grant – Scottish Government Buy Backs 0.000  
Specific Grant – Scottish Government Mortgage to Rent 0.000  
Other Income 0.000        
3.289 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – April to May 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for April to May 2022 relating to Housing and
Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for April to May 2022 relating to
Housing and Technical Resources, be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 12 March 2022 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for April to May 2022. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of May 2022 for Housing
and Technical Resources. 
The Resource absence figure for May 2022 was 6.0%, this figure has decreased by
1.6% when compared to last month and is 0.6% higher than the Council-wide figure. 
Compared to May 2021, the Resource absence figure has increased by 2.1%. 
Based on the absence figures at May 2022 and annual trends, the projected annual
average absence for the Resource for 2022/2023 is 6.8%, compared to a Council-
wide average figure of 5.5%.
10
41

Page 42

For the financial year 2022/2023, the projected average days lost per employee
equates to 8.1 days, compared with the overall figure for the Council of 6.5 days per
employee. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services works in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
The attendance information contained in this report includes absences as a result of
Covid-19 and employees are being supported through this difficult time to maintain
attendance levels where they can.  At the time of this report, the Council overall
absence level was 4.73% with 1.07% of this relating to Covid-19 for sickness and
special leave. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 116 referrals were made this period.  This represents an
increase of 30 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 5 accidents/incidents recorded within the Resource this period, an
increase of 2 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, no disciplinary hearings were held within the Resource, this
represents a decrease of 1 when compared to the same period last year.  During this
period, no appeals were heard by the Appeals Panel.  No grievances were raised
within the Resource, this figure remains unchanged when compared to the same
period last year.  No Dignity at Work complaints were raised within the Resource,
this figure remains unchanged when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 6 leavers in the Resource this period eligible for an exit
interview. This figure has increased by 2 when compared with the same period last
year.  Three exit interviews were conducted in this period an increase of 2 when
compared to the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period April to May 2022, 24 (18.36 FTE)
employees in total left employment, managers indicated that 23 (17.36 FTE) were
being filled and 1 (1.0 FTE) is being left vacant pending a savings or service review.
42

Page 43

5. Staffing Watch 
5.1. There has been a decrease of 7 in the number of employees in post from 12 March
2022 compared to 11 December 2021. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
5 July 2022   
Link(s) to Council Values/Ambitions/Objectives
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
43

Page 44

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
April 4.1 3.2 5.5 April 3.5 3.6 10.6 April 3.8 3.3 7.6 April 4.4 4.3 5.6
May 2.8 2.9 4.5 May 2.0 4.2 8.1 May 2.5 3.4 6.0 May 3.1 4.9 5.4
June 3.2 3.5 June 2.0 6.2 June 2.7 4.6 June 2.7 4.7
July 2.7 4.0 July 2.7 5.7 July 2.7 4.7 July 2.3 4.0
August 2.5 4.9 August 3.4 7.9 August 2.8 6.2 August 3.1 4.7
September 2.1 5.8 September 3.3 8.1 September 2.6 6.8 September 4.2 6.4
October 2.9 5.2 October 3.9 9.0 October 3.3 6.8 October 4.8 6.3
November 3.7 5.7 November 5.6 9.2 November 4.5 7.2 November 5.8 6.9
December 3.3 4.6 December 4.8 9.5 December 3.9 6.7 December 5.6 6.9
January 3.5 5.2 January 4.4 8.8 January 3.9 6.7 January 4.8 7.0
February 3.2 6.4 February 4.7 8.5 February 3.8 7.3 February 4.8 6.6
March 3.1 7.8 March 4.5 10.7 March 3.6 9.0 March 4.9 7.9
Annual Average 3.1 4.9 5.0 Annual Average 3.7 7.6 9.4 Annual Average 3.3 6.1 6.8 Annual Average 4.2 5.9 5.5
Average Apr-May 3.5 3.1 5.0 Average Apr-May 2.8 3.9 9.4 Average Apr-May 3.2 3.4 6.8 Average Apr-May 3.8 4.6 5.5
866 577 1443 16196
For the financial year 2022/23, the annual average days lost per employee equates to 8.1 days.
Council Wide
No of Employees at 31 May 2022No of Employees at 31 May 2022 No of Employees at 31 May 2022 No of Employees at 31 May 2022
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
APT&C Manual Workers
44

Page 45

HOUSING AND TECHNICAL RESOURCES
Apr - May Apr - May
2021 2022
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 19 29
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 86 116
Apr-May Apr - May
2021 2022
Specified Injuries* 0 0
Over 7 day absences 0 2
Over 3 day absences** 1 0
Minor 2 1
Near Miss 0 0
Violent Incident:  Physical**** 0 0
Violent Incident:  Verbal***** 0 2
Total Accidents/Incidents 3 5
Apr-May Apr - May
2021 2022
Total Number of Hearings 1 0
Total Number of Appeals 0 0
Appeals Pending 0 0
Time Taken to Convene Hearing Apr - May 2022
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 0 0
Apr-May Apr - May
2021 2022
Number of Grievances 0 0
Number Resolved at Stage 1 0 0
Number Resolved at Stage 2 0 0
Number Resolved at Stage 3 0 0
Still in Progress 0 0
Apr-May Apr - May
2021 2022
Number of Incidents 0 0
Number Resolved at Informal Stage 0 0
Number Resolved at Formal Stage 0 0
Number of Appeals 0 0
Appeals in Process 0 0
Still in Process 0 0
Apr-May Apr - May
2021 2022
Number of Exit Interviews conducted 1 3
Total Number of Leavers Eligible for Exit Interview 4 6
Percentage of interviews conducted 50% 50%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
49
APPENDIX 2
29 30
9 8
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
29
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide
the "Total Specified" figures.
45

Page 46

FTE* H/C** FTE H/C
Number of Leavers 18.36 24 18.36 24
Replace Employee 17.36 23 17.36 23
Leave vacant pening savings review 1.00 1 1.00 1
Plan to remove for savings 0.00 0 0.00 0
Filling on a Temp Basis 0.00 0 0.00 0
Plan to transfer budger to another post 0.00 0 0.00 0
End of fixed term post 0.00 0 0.00 0
* Full time equivalent
** Head count/number of employees
April 2022 - May 2022 Cumulative total
(Apr 22 - Mar 23)
Appendix 2a
46

Page 47

As at 12 March 2022
Total Number of Employees
F/T P/T F/T P/T
831 23 314 128
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 209.82 628.46 356.31 33.20 9.00 2.00 0.00 0.00 1239.79
As at 11 December 2021
Total Number of Employees
F/T P/T F/T P/T
839 24 311 129
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 210.89 634.14 360.12 30.60 10.00 2.00 0.00 0.00 1248.75
Salary Bands
Appendix 3
JOINT STAFFING WATCH RETURN
HOUSING & TECHNICAL RESOURCES
1296
1303
*Full - Time Equivalent No of Employees
MALE FEMALE
MALE FEMALE TOTAL
TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
47

Page 48

48

Page 49

Report
Agenda Item 
Report to: Housing and Technical Resource Committee 
Date of Meeting: 10 August 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Review of the South Lanarkshire Rapid
Rehousing Transition Plan 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Committee on the completion of the third annual review of the Rapid
Rehousing Transition Plan (RRTP) 2019 to 2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the progress made in delivering the RRTP objectives, as set out in the
RRTP Annual Review 2021/2022, attached as Appendix 1, be noted; 
(2) that the proposed revisions to the RRTP, detailed in section 5, be approved;
and
(3) that the key priorities to be progressed in 2022/2023, detailed in section 7, be
noted 
3. Background
3.1. In October 2017, the Scottish Government established the Homelessness and
Rough Sleeping Action Group (HARSAG) to develop solutions to ending
homelessness and rough sleeping across Scotland.  Included in the
recommendations was the requirement for local authorities to develop a five-year
RRTP.   
3.2. HARSAG was reconvened in June 2020 to make further recommendations on
actions required to end homelessness during the Covid-19 pandemic and beyond,
recognising the increased demand on homelessness services and maintaining a
focus on the prevention of homelessness. 
3.3. South Lanarkshire’s RRTP was developed in collaboration with a wide range of
partners and stakeholders in 2019 and is subject to an established annual review
process.  The plan built upon a long-standing commitment and a well-established
framework within South Lanarkshire, to meet the needs of homeless people. 
3.4.  The second annual review covering the period 2020/2021 was approved by Housing
and Technical Resources Committee on 30 June 2021 and reported to the
Community Planning Partnership Board on 15 September 2021. 
11
49

Page 50

3.5. In accordance with requirements, the third annual review, covering 2021/2022 was
submitted to the Scottish Government on 30 June 2022.  When forwarding the
review, it was noted that it was being submitted, subject to approval at the first
meeting of the Housing and Technical Resources Committee of the new Council. 
3.6. To support implementation of the RRTP, the Scottish Government has confirmed
funding of £451,000 for 2022/2023 and a further £451,000 for 2023/2024.  This
funding will continue to be used to progress delivery of the 5 key priority objectives of
the plan. 
4. Annual Review 2021/2022
4.1. The RRTP is structured around 5 high level priority objectives.  There are 53
indicators against which the Council and its partners monitor progress, comprising
33 actions and 20 measures.  In accordance with wider reporting arrangements
across the Council, these indicators are categorised into ‘blue’, ‘green’, ‘amber’ and
‘red’ depending on the progress made against them. 
4.2. During 2021/2022, positive progress was made, with over 96% of the indicators on
or only slightly behind target, to achieve the projected outcomes within the identified
timescales. Table 1 below, details the categorisation of the 53 indicators. 
Table 1: Categorisation of RRTP indicators 2021/22 
Status Measures Actions Total %
Blue 0 1 1 1.9%
Green  13 31 44 81.1%
Amber  7 0 7 15.1%
Red  0 0 0 0%
Report later/Contextual 0 1 1 1.9%
Totals  20 33 53 100% 
4.3. Table 1 illustrates that good progress continues to be made within the RRTP, with 1
indicator completed, 44 progressing well and on target and 7 showing minor
slippage. 
4.4. Full details and progress against all indicators are provided in the RRTP Annual
Review 2021/2022, attached as Appendix 1 and a summary of progress within each
of the 5 priority objectives has been provided in Table 2 below. 
Table 2: Summary of RRTP Year 3 Achievements 
RRTP Priority Objective  Achievement 
1. Prevent
homelessness
occurring and
significantly reduce
homelessness 
• 657 additional homes for social rent were delivered across
South Lanarkshire.  This included 604 new build properties
and an additional 53 homes secured through the council’s
Open Market Purchase Scheme.  
• 72% of Housing Options cases were closed with support
being provided by the Integrated Housing Options Team to
prevent homelessness from occurring. This is despite an
increase of 28% in approaches to the service on the
previous year.
• An allocation of £254,221 from the Covid-19 Tenant Grant
Fund assisted in homelessness prevention and tenancy
sustainment by providing financial assistance and support to
social rented tenants and tenants in the private rented sector
with covid related rent arrears.
50

Page 51

RRTP Priority Objective  Achievement 
• A further 25% reduction in long term homelessness from 56
households living in temporary accommodation for more
than 1 year in 2020/21 to 42 in 2021/22. This is an overall
65% reduction since the RRTP was implemented in 2019.
2. Significantly reduce
time spent by
households in
temporary
accommodation and
minimise moves
before moving to a
settled home
• 21 homeless households had their temporary tenancies
converted (or flipped) to a Scottish Secure Tenancy (SST),
providing the household with a permanent home and
avoiding the need for further moves.  This exceeded the
target of 20 per year.  Since the introduction of the RRTP a
total of 75 properties have been "flipped" to SSTs.
• Permanent lets to homeless households across social
housing in South Lanarkshire represented 53% of all council
and 32% of RSL lets during 2021/22 and will continue to be
an area of focus during 2022/23.
• A 22% reduction in time spent in temporary accommodation
by households with children.
3. Improve and increase
the provision of
housing support for
households to live
independently within
communities
• The HomeStart team continued to provide support and
assistance to all new tenants, including those who may be at
most risk of not sustaining their tenancy and future
homelessness. In 2021/22, 217 starter packs were provided
to new tenants. Since full roll of the service in 2019, a total of
681 starter packs have been provided to new tenants to help
with sustainment and prevent repeat homelessness.
• Commissioned services, provided by The Salvation Army,
Blue Triangle Housing Association and Right There continue
to deliver tailored packages of intensive support to service
users with multiple and complex needs.
4. Expand the scope of
Housing First and
capacity of our
Housing First
approach to be the
first response for
households with
multiple complex
needs
• A further 11 individuals engaged with the Housing First
programme which offers intensive support and access to
settled housing. Since 2019, 33 individuals have engaged in
the Housing First Programme. 
• The overall sustainment rate for Housing First cases is 83%.
5. Enhance integration
of partnership working
to embed RRTP
through a whole
systems approach 
• Partner Contribution Statements (PCS) support the RRTP by
setting out the specific contributions which each partner
intends to make towards delivering the five priority
objectives. 
• Two Directions relating to health and homelessness are
included within the Health and Social Care Partnership’s
Strategic Commissioning Plan and continue to be
progressed. 
5. Proposed Revisions to the RRTP      
5.1. In addition to reviewing the progress made against the actions and measures set out
within the RRTP action plan, the annual review also provides the opportunity to re-
examine the plan to ensure that the priority objectives, actions and measures remain
appropriate, relevant and measurable. 
5.2. Table 3 below details the proposed amendment to the RRTP and sets out the
existing action to be removed and the proposed replacement action.  Subject to
approval, this revision will be incorporated into the RRTP action plan for 2022/2023. 
51

Page 52

Table 3: Proposed new action for inclusion in RRTP action plan 
RRTP
Ref.
Current action/measure Status RRTP
Ref.
Proposed replacement
action/measure (where
appropriate)
A1.5A Monitor progress of the
expansion of the Private
Sector Access and
Sustainment
Service(PSASS)
administered by YPeople
Complete A1.5B Continue to support people
to overcome the financial
barriers to accessing
accommodation in the
private rented sector through
the PSASS 
6. RRTP Priorities for 2022/2023
6.1. The review of progress in Year 3 of the RRTP noted that, under very challenging
circumstances, significant positive indicators of success have been achieved. The
review also confirmed the continuing commitment of partners to delivering RRTP
priorities over the short-term as well as securing the longer-term objectives of the
plan. 
6.2. Year 4 priorities will build on key learning points from the first 3 years of the plan and
also on the progress achieved by working in partnership to deliver services which are
focussed on preventing homelessness and minimising the impact of homelessness
where crisis cannot be avoided. 
6.3. Detailed below is a summary of the key priorities to be progressed during Year 4 of
the plan (2022/2023):- 
 continue to deliver affordable homes for social rent
 ongoing focus on prevention of homelessness, particularly in relation to
households with children
 continue to reduce long-term homelessness
 sustain or increase the proportion of social housing lets directed to homeless
households
 further progress the homelessness Directions contained within the Strategic
Commissioning Plan 
 continue to maintain and develop links to the Local Child Poverty Action Report
 monitor implementation of specific pathways for victims of domestic abuse and
young care leavers
 continue to implement specific pathways for individuals released from prison
 continue to focus on pathways and a Housing Options approach for young people
 continue to expand the council’s HomeStart service for new tenants
 continue to expand the Housing First approach
 continue to convert temporary units to permanent accommodation 
7. Next Steps
7.1. The RRTP Annual Review 2021/2022, attached as Appendix 1, was submitted to the
Scottish Government by the required timescale of 30 June 2022 subject to approval
by Housing and Technical Resources Committee in August 2022. Officers await
feedback from this submission and will consider any relevant actions within this. 
7.2. The outcomes from the RRTP Annual Review 2021/2022 will be presented to the
South Lanarkshire Community Planning Partnership Board for noting on 14
September 2022. 
52

Page 53

8. Employee Implications
8.1. There are no employee implications as a result of this report. 
9. Financial Implications
9.1. The RRTP confirmed the significant level of resources required to be directed
towards the prevention and alleviation of homelessness.  The Scottish Government
has provided £2,184,717 in funding to assist in the development and implementation
of the RRTP.  This includes £451,000 to support the continued implementation of the
RRTP in 2022/2023. 
9.2. As part of the ongoing RRTP monitoring and review process, consideration is given
by all partners on how to further embed RRTP activities into mainstream services. 
At the same time partners will continue to identify opportunities to access additional
funding, which is required to meet not only RRTP objectives but also to support
achievement of national objectives detailed within the Ending Homelessness
Together Action Plan. 
10. Climate Change, Sustainability and Environmental Implications
10.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
11. Other Implications
11.1. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
11.2. There are no additional risks associated with this report. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. An equality impact assessment was carried out on the RRTP.  The assessment
confirmed that the plan will make a positive contribution to the promotion of
equalities. 
12.2. A Strategic Environmental Assessment (SEA) pre-screening determination was
completed as part of the development of the RRTP 2019 to 2024. This confirmed
there is no requirement for a separate SEA to be carried out for the RRTP. 
12.3. The RRTP was developed and co-produced with a range of key partners and
stakeholders.  These groups have confirmed their commitment to work together to
ensure the delivery of the priority outcomes.  Through the Homelessness Strategy
Group, these partners have been involved in monitoring and reviewing progress of
the plan. 
Annette Finnan
Head of Housing Services 
(Housing and Technical Resources) 
29 June 2022 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Our children and young people thrive
53

Page 54

 Good quality, suitable and sustainable places to live 
List of Background Papers
 South Lanarkshire Rapid Rehousing Transition Plan 2019-24, Housing and
Technical Resources Committee Report, 23 January 2019
 Annual Review of the South Lanarkshire Rapid Rehousing Plan 2020/21. Housing
and Technical Resources Committee Report, 30 June 2021 
Contact for Further Information
If you would like further information, please contact:- 
Jacqueline Fernie, Homelessness and Housing Support Manager
Jacqueline.fernie@southlanarkshire.gov.uk 
Lesley Cockburn, Strategy Co-ordinator (RRTP)
Lesley.cockburn@southlanarkshire.gov.uk 
54

Page 55

1 
Appendix 1 
South Lanarkshire Council 
Rapid Rehousing Transition Plan   
Annual Review 2021/22 
11
55

Page 56

2 
Contents 
Foreword ................................................................................................................................. 3
1. Executive Summary ........................................................................................................ 4
2. Background ..................................................................................................................... 5
3. Homelessness Trends in South Lanarkshire .............................................................. 10
4. Year Three progress ..................................................................................................... 17
5.  Proposed Changes to Rapid Rehousing Transition Plan (RRTP) ............................. 25
6. Priorities for 2022/23 .................................................................................................... 26
Appendix 1: RRTP Action Plan ........................................................................................... 29 
56

Page 57

3 
Foreword
Councillor Davie McLachlan
Chair of Housing and Technical Resources Committee 
I am pleased to report that that the third year of South Lanarkshire’s Rapid
Rehousing Transition Plan has been a successful one with a wide range of
services and partner organisations coming together and working towards
our shared aim of addressing homelessness across South Lanarkshire 
This review shows the breadth of work that has been undertaken over the
year.  I am pleased to see the reduction in the level of homelessness in
South Lanarkshire and, in particular the significant reduction in the number
of people who have been homeless for more than 12 months. We have
also continued to work towards the commitment to deliver 1,000 additional
council homes, alongside significant increases in the numbers of additional
affordable housing provided by our housing association partners. 
As we move forward into year four of the plan, I am confident that we will continue to build on the
good work and outcomes already achieved.  Ensuring we maximise opportunities to increase the
supply of affordable housing will provide the essential foundation for delivering the impact on
homelessness which we seek to achieve over the remaining two years of the plan. 
Councillor Joe Fagan
Chair of South Lanarkshire’s Community Planning Partnership Board
Over the past year, a wide range of work to tackle homelessness and meet the
needs of homeless households has been delivered by partners from across the
Community Planning Partnership. 
This review highlights just some of the excellent work that is being
delivered every day by partners to improve the lives of people in South
Lanarkshire. In particular, it is really encouraging to see new, innovative
approaches to support those who are amongst the most vulnerable in our
community, particularly given the challenges many have also faced during
the Covid-19 pandemic. 
We must continue to work together, utilising the strength of the Community Planning Partnership to
ensure that we achieve a step change in addressing homelessness across South Lanarkshire over
the next year of the Plan. 
57

Page 58

4 
1. Executive Summary 
1.1 Effective partnership working and a shared commitment to addressing homelessness has
enabled good progress to be made during the third year of the South Lanarkshire Rapid Re-
Housing Transition Plan (RRTP). 
This review, co-ordinated by the Homelessness Strategy Group, confirms South
Lanarkshire’s continuing commitment to partnership working in the delivery of services and
support to those at risk of or who are experiencing homelessness, and the progress made in
delivering on the outcomes within the RRTP.
A summary of the key highlights from the third year of the RRTP include: -
• A 21% reduction in the number of households who were homeless (969 households at
the 31 March 2021 reducing to 765  households at the end of March 2022)
• A 4% reduction in the number of homeless presentations to the Council from 2225 in
2020/21 to 2134 in 2021/22
• A significant reduction in long-term homelessness, with 25% fewer homeless households
living in temporary accommodation for more than 12 months.
• A 22% reduction in time spent in temporary accommodation by households with children
since March 2020/21 
• An 8% reduction in children affected by homelessness since 2018/19
• Continued growth of the Housing First approach with a further 9 households with multiple
and complex needs supported during the year.  A total of 33 households are now
included within the programme.
• The council and its Housing Association partners continued to increase the supply of
affordable housing in South Lanarkshire, delivering a total of 657 additional homes
during the year.
• A continued focus on the percentage of empty social rented properties directed to
homeless households saw, 53% of all vacant council homes and 33% of Registered
Social Landlord lets in 2021/22 to homeless households compared to 49% and 29%
respectively from the RRTP baseline set in 2018. 
• A 1% increase in the number of homeless households sustaining their tenancies for
more than 12 months, to 92% overall.
• A further 21 temporary homes converted to secure tenancies, reflecting the choice of the
homeless household, and settled position reducing any further upheaval.
• A continued focus across the partnership to delivering quality person-centred support
meeting a wide range of needs 
• Increased funding through the Tenancy Sustainment Fund to assist council tenants
experiencing financial difficulties 
• 324 households across all tenures were provided with financial assistance for covid
related rent arrears, through the Scottish Government Tenant Grant Fund.
• An increase in housing options prevention activity, with a continued focus on early
intervention resulted in homelessness being prevented in 72% of cases.
• Continuation of the successful HomeStart service, assisting 217 new tenants settle into
their home and community, which includes furniture starter pack, financial advice
including assistance to access benefits and minimise fuel costs, preventing the risk of
repeat homelessness.
• Further promotion of digital inclusion through the continuation of the ‘Bringing IT Home’
and Connecting Scotland programme, with a further 79 vulnerable households provided
with devices and unlimited internet access for 2 years. 
58

Page 59

5 
2. Background
2.1 National Context 
The requirement to prepare Rapid Rehousing Transition Plans (RRTPs) was introduced by
the Scottish Government in 2018. The RRTP and subsequent reviews have documented the
dynamic policy and legislative context within which the RRTP is being implemented. This
challenging context has continued in 2021/22 and included the following major
developments: - 
• ‘Preventing Homelessness in Scotland’, a consultation published jointly by the Scottish
Government and COSLA   in December 2021, sought views on proposals to introduce
statutory prevention duties across public bodies, re-emphasising that the responsibility
for preventing homelessness needs to be shared across community planning partners. 
• The publication of ‘Branching Out: The National Framework’ was launched to support 
organisations to scale  up Housing First. This framework encourages local authorities to
work towards the provision of evidence-based systems with integrated services and a
right based, person-centred approach to housing and homelessness. 
• ‘Housing to 2040’, the Scottish Government’s route map for the housing sector over the
next 20 years was published in March 2021. The publication sets out the Scottish
Government’s ambition to deliver 110,000 affordable homes by 2031/32 which is
anticipated to deliver outcomes in tackling child poverty and alleviating homelessness.
There is also a strategic objective to progress new approaches to house those
experiencing homelessness quickly and provide an appropriate intensity of support
through Housing First
• The links between homelessness and poverty are well documented and 2021/22 has
witnessed a significant economic downturn accompanied by what has been
characterised as the “cost of living crisis”. It is projected that the period ahead will
continue to present significant economic challenges which will disproportionately impact
on economically disadvantaged households at greatest risk of homelessness. 
2.2 South Lanarkshire Context
South Lanarkshire Council’s Rapid Rehousing Transition Plan 2019-24 (RRTP) was
developed in conjunction with a wide range of partners and submitted to the Scottish
Government in December 2018. The RRTP builds upon a well-established partnership
framework in South Lanarkshire and aims to act upon the opportunity to achieve a step
change in preventing and reducing homelessness. The vision set out in South Lanarkshire’s
RRTP is to ensure: - 
“Homelessness in South Lanarkshire is significantly reduced, with homeless households
moving to a settled home as quickly as possible” 
2.3 South Lanarkshire Council has a long-standing strong commitment to meeting the needs of
homeless people. In 2021/22 the focus has been to continue this approach and seek
opportunities to implement developments in integrating services to improve outcomes for
homeless households. These include an integrated housing contribution statement in the
59

Page 60

6 
new Health and Social Care Partnership’s Strategic Commissioning Plan (2022-25) and an
ongoing commitment to address homelessness within the South Lanarkshire Community
Plan. Indeed, the alignment of the RRTP with community planning is further emphasised by
the inclusion within the new “Community Plan 2022 to 2032” of the following high-level
priority 
We will work in partnership to prevent and significantly reduce homelessness, and
improve outcomes for those at risk of or who experience homelessness 
2.4 Over several years, the council has significantly increased and developed its use of
temporary accommodation to meet a range of needs, tested and expanded prevention
activity. During 2021/22 a ‘Temporary Accommodation Strategic Plan’ has been developed
in partnership with an external consultant which has provided a remodelling tool with the aim
of monitoring and projecting forward as we anticipate demand continues to reduce, ensuring
supply is maintained at the optimal level throughout and beyond the transition period
streamlining the provision of temporary accommodation in South Lanarkshire over the
longer-term.
2.5 Co-production 
The South Lanarkshire RRTP was co-produced through intensive engagement with key
partners and this approach has been continued in the development and delivery of this, and
the two previous annual reviews. The RRTP links to wider strategic groups including the
Local Housing Strategy Steering Group, Homelessness Strategy Group, ‘Make A Stand’
Group, which includes representation by Women’s Aid South Lanarkshire and East
Renfrewshire, a range of Corporate Parenting groups and boards, Alcohol and Drug
Partnership and related groups such as drug death monitoring.  The review reflects the
progress that has been made against the most challenging of backdrops, including
continuing to mitigate the impact of Covid-19 and support people facing the most difficult
financial circumstances.  
2.6 Covid-19 
While the impact of the pandemic has continued in 2021/22 the improving context has
enabled a focus on progressing towards pre-pandemic levels for key indicators, such as the
number of homelessness presentations and the level of homelessness. In this regard,
progress has been, made within the year with a 4% decrease in homelessness
presentations, a 15% decrease in the levels of homelessness and a 6.5% decrease in
demand for temporary accommodation. This trend mirrored that experienced across
Scotland where between September 2020 and September 2021, there was also a 7%
decrease in demand for temporary accommodation.
2.7 Local Resilience
The Homelessness Strategy Group continued to meet on an 8-weekly basis on a virtual
platform throughout 2021/22 allowing monitoring of key objectives and planning to continue.
Flexibility and resilience became apparent as key learning points from the pandemic.
A system of quarterly monitoring of the RRTP Measures and Actions was established during
2021/22 which has kept relevant stakeholders and senior management informed of progress
throughout the year and provided the opportunity to raise awareness of Rapid Rehousing.
Senior managers from the council also attended regular meetings of the Housing Options
West HUB meeting, benefiting from shared learning across authorities and Scottish
Government updates. 
60

Page 61

7 
2.8 Links to other Strategies
The RRTP was developed to align closely with a broad range of partner strategies and plans
being progressed in South Lanarkshire. Figure 1 below demonstrates the relationship
between these and the National Housing and Regeneration Performance Framework.
Figure 1: Diagram showing RRTP Links to other plans and strategies
National Housing and Regeneration Performance Framework
A well-functioning
housing system
High quality,
sustainable homes
Homes that meet
people’s needs
Sustainable
communities 
South Lanarkshire Community Plan 22 to 32 
“Improve the lives and the life prospects of everyone
in South Lanarkshire”
Local Housing Strategy (LHS) 2022-27
“Housing in South Lanarkshire is more suitable, affordable
and sustainable to help meet current and future residents’
needs”
Strategic
Commissioning
Plan 2022-25
Child Poverty
Action Plan 
Strategic
Housing
Investment Plan
2022-27
Rapid Rehousing Transition Plan 2019-24
“Homelessness in South Lanarkshire is significantly
reduced, with homeless households moving to a settled
home as quickly as possible.”
Locality
Commissioning
Plans
LHS Outcomes
Addressing Homelessness
Housing Supply, Affordability and Choice
Supporting Independent Living 
Housing
Contribution
Statement
Alcohol and
Drug
Partnership
Strategy 
2020-23
Children
Services Plan
2021-23
61

Page 62

8 
2.9 During 2021/22, further work continued to strengthen the above links, ensuring homelessness
and its wider impact is appropriately reflected in each strategy/plan. Key developments
included: -
• the inclusion of actions relating to homelessness within the Local Child Poverty Action
Plan 2022/23.
• the inclusion of specific RRTP related priorities within the South Lanarkshire Community
Plan.
• the inclusion of homelessness actions and monitoring within the Children’s Services
(Corporate Parenting) Action Plan and Re-designing Children’s Services plan.
• progression of two Homelessness Directions within the Health and Social Care
Partnership’s Strategic Commissioning Plan (2022-25).
• the inclusion of action on homeless prevention within the Alcohol and Drug Partnership
Strategy 2020-23 (Priority 4 A public Health Approach) and overall emphasis on early
intervention and prevention. 
• As noted above the inclusion of the high-level priority relating to homelessness within
the new “Community Plan 2022 to 2032” 
2.10 Governance 
The South Lanarkshire Homelessness Strategy Group is the partnership responsible for the
prioritisation and delivery of actions set out within the RRTP, in addition to the range of actions
routinely monitored across the range of partnership plans.
The group meets every eight weeks and have the following remit: -
• monitoring and reporting on progress in relation to the RRTP.
• reviewing and updating key actions and measures/indicators, considering new and
emerging policy priorities and resources as required.
The RRTP was developed to ensure that its’ priority objectives align with the Local Housing
Strategy (LHS) 2022-27 priority outcomes for addressing homelessness. 
Annual updates on progress against the actions within the LHS are reported to Executive
Committee and the RRTP reported to Housing and Technical Resources Committee and the
Community Planning Partnership Board.
2.11 Funding
In 2021/22, the third full year of the plan, £440,000 was allocated to South Lanarkshire from
the Scottish Government.  Scottish Government funding from year two was carried forward
into Year three of the RRTP and was fully committed to RRTP activities. In December 2021 it
was confirmed that £453,000 would be allocated to South Lanarkshire for 2022/23 and
2023/24.  
Since the first award of funding from the Scottish Government in 2019 and taking account of
the funding noted above for future years, a total of £2.643m has been allocated to South
Lanarkshire to support the development and implementation of the RRTP.
As noted in previous review the level of funding allocated and secured since 2019 is less than
the original calculation made of the resources required to secure full delivery of the plan. 
While partners have continued to progress actions utilising all resources available, some
actions within the plan have been limited or not progressed as a result.
62

Page 63

9 
A summary of the key areas which have been progressed using funding received from the
Scottish Government’s Ending Homelessness Together Fund is detailed below: -
• Expansion of specialist support services to meet a range of complex need including
repeat homelessness, multiple needs in particular addiction and mental health, further
supported by Alcohol and Drug Partnership (ADP) funding.
• Scaling up of the Housing First approach and enhanced furniture starter pack provision
offering homeless households’ greater choice and support in making their house a
home.
• Continued focus on homeless prevention at points of transition in people’s lives,
including the further development of the Sustainable Housing on Release for Everyone
(SHORE) approach 
• Continued delivery and further development of 
o approaches to Gender Based Violence and
o housing pathway planning for young people moving on from care 
• The further development of services to prevent homelessness in the private sector
through the Private Sector Access and Sustainment Service delivering advice along with
practical and financial support to sustain private tenancies. 
• Delivering ‘Bringing IT Home’, a digital inclusion programme, further supported via
Connecting Scotland and Lintel Trust funding.
• Establishment of a fully trained peer support network supported by wider partnership
networks for ongoing learning, development, and support
• Re-configuration of services based on learning through pandemic and positive outcomes
achieved. 
• Strengthening of pathway approaches to ensure a planned approach to meeting the
needs of specific groups, including young care leavers and those fleeing domestic
abuse
Other funding sources
Partners within the Homelessness Strategy Group are clear on the need to actively consider
other potential funding routes to take forward priority activities, and how mainstream services
and budgets can be revised or re-focused to help deliver RRTP priorities.
Significant progress was made in the year with:
• Confirmation of additional funding from the EU Poverty and Inclusion fund of £172,976,
which will largely be utilised to deliver the HomeStart project providing valuable
information and practical assistance to new tenants
• Distribution of £173,082 allocated from the Scottish Government Tenant Grant Fund
established to provide financial assistance to tenants from the social and private rented
sectors with covid related rent arrears
• A test pilot for specialist support to meet multiple and complex needs with £63,000
committed by the Drug Task Force in 2021/22 delivered a 1-year programme in
63

Page 64

10 
partnership with Turning Point Scotland. This service was successful in its aim to meet
gaps in crisis response service provision out with office hours and intervening to 
prevent injury or deaths among the homeless population. Learning from this test for
change work informed development of a new ADP funded out of hours service in South
Lanarkshire established in 2022/23. 
• The Alcohol and Drug Partnership has also confirmed an allocation of £80,000 in year
four and five of the plan to deliver services specifically designed to meet the needs of
vulnerable women with addictions.
• The Criminal Justice Service committed £40,000 to test a community-based sentencing
partnership approach. 
• Successful partnership bid to Healthcare Improvement Scotland for inclusion in a
yearlong “Reducing Harm, Improving Care” programme brought expert resources to
South Lanarkshire’s partnership enhancing our collaborative approach to meeting need,
in particular for those experiencing homelessness, addiction and poor mental health.   
3. Homelessness Trends in South Lanarkshire
3.1 In line with national guidance the RRTP incorporates analysis of homelessness trends over
the last 15 years.  The annual review provides an opportunity to consider any significant
changes against the baseline position, review projections contained within the RRTP and
analyse the outturn figures, at the end of the third year. 
3.2 In the previous financial year (202/21) the impact of the Covid 19 pandemic resulted in
significant divergence from key long term homelessness trends, such as the level of
application and demand for temporary accommodation.  While, as noted above there has
during the year been a move towards pre-pandemic levels for some indicators   significant
uncertainty remains in relation to homelessness trends. Considered alongside the
particularly challenging economic climate and the “cost of living crisis “there is a clear
potential for demand for homelessness services to increase over the short and medium term.
The challenging context further underlines the importance of local partners continuing to
work collaboratively to monitor and respond to the direction of emerging measures. 
3.3 The year has also witnessed a significant increase in the involvement of local partners in   
supporting national refugee resettlement programmes, with the establishment of the “Homes
for Ukraine Scheme” and the continued expansion of the “Afghan Resettlement
Programme”. Additionally, in April 2022 the UK Government announced its intention to
implement a policy of “full dispersal” of asylum seekers with target levels of dispersal to each
nation and region to be established during 2022/23. Given the on-going crisis in Ukraine and
wider global uncertainty it can be anticipated that both locally and nationally demands for
housing and support services  for refugees and people seeking asylum will increase 
significantly in the year ahead . 
3.4 Homelessness demand 
3.4.1 Figure 2 below demonstrates the trend in the number of homelessness presentations
received between 2002/03 and 2021/22, measured against the number of cases where the
council had a duty to house the applicant and the number of cases that resulted in a Scottish
Secure Tenancy being allocated upon case closure. 
64

Page 65

11 
Figure 2 – Homelessness trends 2002-2021 
• There has been a 4.1% decrease in the number of homeless presentations, from 2,225
in 2020/21 to 2,134 in 2021/22. This is despite the challenges of the pandemic and
reveals a downward trajectory towards pre-pandemic levels.
• Of the total number of presentations, the council had a duty to house 77% compared
with 75% in 2020/21. This is a welcome downward trajectory in short term demand for
temporary accommodation not witnessed through the pandemic. The reduction took
place in the context of the council continuing to provide good quality temporary
accommodation from point of contact until homelessness is resolved
• Positive outcomes remain proportionally high with 80% of statutory homeless
households being provided with a Scottish Secure Tenancy either by the council or by
RSL partners. This is outcome is higher than the Scottish national figure of 78%. 
• Tenancy sustainment continues to improve with 92% of homeless households
sustaining their tenancy for over 12 months in 2021/22, compared with 91% in 2020/21.
• There has been a continued focus on maximising the percentage of lets to homeless
households in 2021/22 (53%). Although within target bands agreed, this is lower than
2020/21 level, in part due to the impact and timescales related to regeneration new build
activity with secondary lets progressing beyond year end. The council will continue to
focus on maximising lets to homeless households, including ongoing work with RSL
partners to maximise overall lets to homeless households.
• The percentage of homeless households being allocated a Scottish Secure Tenancy
increased to 53% which is higher than Scottish national figure of 51% 
0
500
1000
1500
2000
2500
3000
3500
Homelessness Trends
Presentations Duty Outcome Scottish Secure Tenancy
65

Page 66

12 
3.4.2      Reasons for homelessness 
Figure 4 below provides a comparison of reasons for homelessness between South
Lanarkshire and Scotland in 2021/22. 
Figure 4 – Reasons for homelessness   
• Being asked to leave current accommodation continues to be the most common reason
for presenting as homeless in South Lanarkshire (27.68%) which is a slight reduction on
2020/21 level of 28.21%.
• Fleeing non-domestic violence accounted for 12.19% of presentations in South
Lanarkshire during 2021/22 which is a 3% reduction on 2020/21 level.
• Dispute with a violent partner accounted for 16.96% of all homeless presentations in
South Lanarkshire, this is an increase of more than 3% on 2020/21 level. 
3.4.3 By continuing to monitor RRTP data and its links to the Local Child Poverty Action Report it
will be possible to shape support within our homelessness services to meet the needs of
homeless households to reduce the likelihood of children going on to experience poverty and
homelessness in adulthood. This also aligns with relevant housing and homelessness
content within the South Lanarkshire Community Plan. The plan, during 2022/23, will focus
on the prevention of homelessness and reducing time spent in temporary accommodation. 
3.4.4  Where homelessness cannot be prevented the partnership is keen to ensure needs and
vulnerabilities are understood at the earliest opportunity to mitigate the impact of
homelessness on health and well-being. Between January and June 2021 150 referrals were
made to the Homelessness Nursing Service of NHS Lanarkshire, they continue to provide a
nurse led team assessing the needs of homeless households and referring on to the
necessary services to improve health and well-being.
To further develop partnerships across health and homelessness services in March 2022,
South Lanarkshire Health and Social Care Partnership Integration Joint Board reinforced the
commitment to progress two homelessness Directions: firstly, to prioritise access to health
0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00%
Asked to Leave
Fleeing Non-domestic Violence
Dispute with Violent Partner
Reasons for Homelessness
SLC 2021/22 SLC2020/21
66

Page 67

13 
services for homeless households and establish routine enquiry about homelessness with
service users.  These Directions align with the particular and specific focus on homelessness
within the Health and Social Care Partnership’s Strategic Commissioning Plan 2022-25. 
Effectively identifying needs will facilitate positive communication between Housing, Health
and Social Care and Education and assist with the establishment of   a co-ordinated care
approach, particularly for those with multiple and complex needs. This will help mitigate  the
impact of homelessness as a traumatic event, an Adverse Childhood Experience (ACE) both
independently and heightened for those who experience the collective impact of other
traumatic experiences.  This would particularly help with the planning and delivery of
services for  those who may be more vulnerable such as children and young people, those
experiencing domestic abuse, experiencing mental health or addiction issues. 
3.4.5  Prevention of Homelessness 
Figure 5 illustrates the number of cases managed by the council’s Housing Options service
between 2018/19 and 2021/22 and details of the outcome of advice provided. 
Figure 5 – Number of Housing Options cases and outcomes 
• In the four-year period between 2018/19 and 2021/22, the number of approaches for
advice and assistance to the council’s Housing Options services increased by 25%, from
912 to 1137, the increase in approaches can be attributed at least in part, to increased
awareness of the services provided by the Integrated Housing Options Team 
• Positively, the increase in the number of housing option cases has also been
accompanied by an increase in the proportion of cases where homelessness has been
prevented from 731 in 2020/21 to 817 cases in 2021/22. This underlines the positive
difference the Housing Options approach continues to have on preventing
homelessness in South Lanarkshire. 
There has been a significant focus on the development of prevention services over recent
years, including during the period of the pandemic in preparation for an anticipated
increased demand on this important first response to emerging housing need and risks.
0
200
400
600
800
1000
1200
2018/19 2019/20 2020/21 2021/22
Housing Options Cases and Outcomes
Housing Options Cases
Cases Resulting in Homelessness Presentation
Cases Where Homelessness was Prevented
67

Page 68

14 
3.5 Affordable Housing Supply (Social Rented)
3.5.1 Figure 6 below, provides details of the increase in social rented stock (owned by the council
and Registered Social Landlords) across the different localities over the last two years.   
Figure 6 – Total Social Rented Housing Supply (non-sheltered) 
Description Clydesdale East
Kilbride Hamilton Rutherglen/
Cambuslang
South
Lanarkshire
RRTP Baseline 6,077 6,261 10,970 6,674 29,982
2019/20
additions 32 107 93 52 284
2020/21
additions 6 210 10 113 339
2021/22
additions 62 108 177 310 657
Total 6,177 6,686 11,250 7,149 31,262 
• Throughout the third year of the RRTP and despite the challenges to the construction
industry due to Covid-19, the council and its’ Registered Social Landlord partners have
continued to increase the number of affordable homes for social rent across South
Lanarkshire. 
• In the 2021/22, a total of 657 additional affordable homes were delivered with 24% (155
homes) designed to meet the needs of those with particular needs, including wheelchair
users. 
3.5.2 Temporary Accommodation 
Figure 7 below provides details of the supply of mainstream (self-contained furnished
accommodation) by locality over the period since the RRTP was established   
Figure 7 – Breakdown of mainstream temporary accommodation units by locality. 
• During 2020/21, in response to Covid-19, a targeted approach was adopted to increase
the supply of temporary accommodation in each locality as an interim measure to meet
increased demand linked to the pandemic.  Figure 7 above shows that over the course of
the last year, across South Lanarkshire, there was a 10% decrease in the supply of self-
0
100
200
300
400
500
600
700
800
RRTP Baseline 2019/20 2020/21 2021/22
Clydesdale East Kilbride Hamilton Cambuslang/Rutherglen Total
68

Page 69

15 
contained furnished temporary accommodation properties (from 676 units in 2020/21 to
609 units in 2021/22) because of decreasing demand for temporary accommodation over
the course of 2021/22. 
• In addition to the council’s core temporary accommodation provision, self-contained
furnished properties, ordinary homes across our communities, additional congregate
living accommodation complements the portfolio. This ensures immediate housing and
support needs can be met, on a 24-hour 7 day per week basis. The council’s First
Stop/Rapid Access Accommodation provides 83 units of safe, welcoming accommodation
with staff providing appropriate assistance and support. There are also 49 units of
specialist supported accommodation and 26 units of refuge accommodation through
Women’s Aid. 
3.5.3 Our objective is to ensure that all homeless households spend the shortest possible time in
suitable temporary accommodation before moving to a settled home. Reducing the need for
temporary accommodation was an intended outcome of the council’s LHS objectives, later
reinforced within the RRTP and at the end of Year one there were early positive indications
of this, whilst delayed by covid we are again making positive progress
3.5.4 A review of temporary accommodation was carried out during 2021/22 in partnership with an
external contractor, with input from a range of stakeholders including elected members. This
aim of this exercise was to  
- assess the effectiveness of the current model in delivering successful outcomes, and 
- support continued provision of the right level of good quality temporary accommodation,
and 
- inform the actions required to achieve RRTP targets to reduce supply of temporary
accommodation when it was appropriate to do so.
This has informed the new Temporary Accommodation Strategic Plan which has been
developed and will be implemented from 2022/23 onward
3.5.5 The process of “flipping” temporary units to Scottish Secure Tenancies has continued, with
75 units having been converted to a permanent home for homeless households since the
implementation of the RRTP in 2019 with a focus on planning for longer term cases. 
Case Study: Flipped Tenancy 
One homeless household was very pleased with the offer of converting her temporary
accommodation as her son had become very settled in the property.
Her eight-year-old son had developed severe anxiety due to witnessing violence against
his mum in her previous relationship. He would not let his mother out of his sight and had
become very isolated and would not mix with other children.
When they were allocated their temporary accommodation, the child became settled,
started going to the park with other children and his schoolwork began to improve.
Identifying this was a positive move for this family the Housing Support Officer discussed
the possibility of offering the property as a permanent settled home and a positive solution
to their homelessness. The service user reports 
“This really worked in my benefit, I couldn’t believe my luck and I’m over the moon, my
neighbours are pleased there is someone in the house permanently, I am a happy
customer”. 
69

Page 70

16 
3.5.6 Figure 8 provides a comparison of the average number of days spent in temporary furnished
accommodation (excluding First Stop, Supported) between 2019 (RRTP baseline position)
and 2021/22. 
South Lanarkshire Council’s temporary accommodation planning, and monitoring processes
have ensured consistent provision of suitable temporary accommodation with any use of
unsuitable options such as bed and breakfast being minimal and very short term, there has
therefore been no breaches of the Unsuitable Accommodation Order to report. 
Figure 8 – Average number of days spent in temporary furnished accommodation by Locality 
• The South Lanarkshire average number of days spent in self-contained temporary
furnished accommodation decreased by 20% from 226 in 2020/21 to 181 days in
2021/22 and is now at the lowest point since the RRTP was approved.
• In 2019 (RRTP baseline) the average time spent in temporary furnished accommodation
varied significantly by area, from 127 days in Clydesdale to 286 days in East Kilbride. 
The South Lanarkshire average being 200 days. This is due to higher demand for
accommodation in more urban localities.
• There has been a 22% reduction in the time spent in temporary accommodation for
households with children from 221 days in 2020/21 to 164 days in 2021/22
• Throughout the period the council has continued to make only minimal use of bed and
breakfast accommodation, with only 32 placements and  an average stay of  1.7 nights
during 2021/22
3.5.7 A specific focus on reducing long-term homelessness has resulted in a significant
achievement in the year with a 65% reduction in homeless households living in temporary
accommodation for more than 12 months, from 120 households in 2018/19 to 42 households
in 2021/22. This underlines the positive impact which the partnership is having and allows a
positive projection to achieving an end to long-term homelessness in South Lanarkshire
within the five-year timescale of the RRTP. 
3.6 Repeat Homelessness
3.6.1 During 2021/22, there has been an increase in the proportion of repeat homelessness cases
compared with the previous year from 4.6% in 2020/21 to 5.6% in 2021/22. This broadly
200
286
195
186
127
186
267
194
161
99
226
302
212
197
138
181
205
156
207
106
South Lanarkshire
East Kilbride
Ruth/Cam
Hamilton
Clydesdale
2021/22
2020/21
2019/20
RRTP  Baseline
70

Page 71

17 
mirrors the national figure of 5% and there continues to be an increased focus on support,
particularly for cases with complex needs, which contributes to improvements in tenancy
sustainment and prevention of repeat homelessness.  Analysis of repeat homelessness is
ongoing and informing future service development. 
Relatively low levels of rough sleeping continue to be reported across South Lanarkshire,
from 162 reported instances during 2020/21 to 161 instances reported during 2021/22.
Ongoing analysis shows households largely sleep rough through choice or lack of
awareness of assistance available. In response a focused action plan was developed in
collaboration with service users and partners intended to effect positive change. An example
of action progressed during 2021/22 was promoting our 24-hour access to homeless
services, including temporary accommodation, across the partnership (food banks,
publications in health and public sector locations) and a social media campaign. On a
positive note, a downward trajectory was noted towards year end, this remains an area of
focus into 2022/23.
4. Year Three progress
4.1 Tackling homelessness requires a shared commitment from a range of agencies and
partners in the public, private and third sectors. As such the RRTP was co-produced with
partners and stakeholders involved in the decision-making process for agreeing priority
actions contained within the plan.
4.2 Reviewing the plan 
The Homelessness Strategy Group has responsibility for monitoring progress in relation to
the RRTP and overseeing the annual review, including the evaluation of progress against
actions and measures set out within the action plan and consideration of the
appropriateness of the actions identified. 
During the process of reviewing the third year of the RRTP, it has been recognised that
progress has built upon the existing foundations of strong partnerships, and this will ensure
the continuation and further development of key areas of work, it has been noted that while
the expected progress in Year three has resulted in meeting key objectives whilst adapting
to the impact of the public health emergency, a structure is in place enabling the
achievement of positive outcomes. 
4.3 Review Scorecard 
To monitor progress against each of the five priority objectives in the RRTP, a traffic light
scoring system is used. Attached to the priorities are 53 indicators comprising of 33 actions
and 20 measures. A further category of blue is an addition to the second annual review and
highlights actions which have been completed. Figure 8 below provides a summary of the
position in relation to the progress made towards the achievement of the five priority
objectives of the RRTP during 2021/22. Over 96% of indicators were either achieved or were
close to target. 
71

Page 72

18 
Figure 8: Scorecard
RRTP Scorecard 2020/21 Blue Green Amber Red Grey Total
Prevent homelessness
occurring and significantly
reduce homelessness
1 10 3 0 0 14
Significantly reduce time
spent by households in
temporary accommodation
and minimise moves before
moving to settled homes
0 10 2 0 0 12
Improve and increase the
provision of housing support
for households to live
independently within
communities
0 12 0 0 0 12
Expand the scope and
capacity of our Housing First
approach to be the first
response for households with
multiple complex needs
0 8 1 0 1 10
Enhance integration and
partnership working to embed
RRTP through a whole
systems approach
0 4 1 0 0 5
All 1 44 7 0 1 53 
Colour Progress
Blue Complete
Green Achieved/on target
Amber Minor slippage
Red Significantly off target
Grey Report Later/Contextual 
4.4 Key Highlights of Progress Made in Year 3
Detailed below are key highlights of the progress that has been made towards delivering the
actions and measures outlined for Year three for each of the five RRTP priority objectives.
Some examples of service user feedback and case studies have also been provided to
demonstrate the positive outcomes achieved.
A summary of progress made in Year three, in relation to all actions and measures detailed
in the RRTP Action Plan is also attached as Appendix 1. 
72

Page 73

19 
Priority Objective 1: Prevent homelessness occurring and significantly reduce
homelessness
• Significant impact on the levels of homelessness with a 21% reduction in the homelessness
case load from the previous year. This achievement reflects the successful impact of early
intervention through integrated housing options and a continued partnership focus on RRTP
objectives.
• Improved availability of affordable housing in South Lanarkshire, with a total of 657 additional
affordable homes for social rent delivered in 2021/22. This included 189 new build homes by
Registered Social Landlords, 468 additional council homes (including 53 purchased through
the Council’s Open Market Purchase Scheme) 
• Continued approach to promoting access to and sustainment of tenancies in the private sector
in partnership with Right There (formerly YPeople). This includes an Innovation Fund which
provides financial assistance to sustain private sector tenancies and prevent homelessness,
including during 2020/21 the benefit of additional hardship funding administered to the private
sector to prevent eviction due to build-up of arrears linked to the outbreak of covid19. 
• Continued focus on early detection of housing risk factors and interventions to prevent
homelessness where possible through the Integrated Housing Options model. In 2021/22,
72% of advice cases were closed with support being provided to prevent
homelessness from occurring.  This is despite a 28% increase in demand for services on
the previous year.
• Continued strong focus on partnership working with commissioned services (Right There, The
Salvation Army, Turning Point, Women’s Aid, and Blue Triangle Housing Association), to
deliver homelessness prevention and tenancy sustainment services, with a particular focus on
households at risk of repeat homelessness.
• Improved service pathways developed between the Integrated Housing Options Team and
Adult Employability Services to support adults at risk of homelessness to access work
education or training.
• Ongoing pathway approach to ensure a planned approach to meeting the needs of young
people moving on from a care setting and those affected by domestic abuse with a view to
preventing homelessness wherever possible 
• Ongoing joint approach to supporting young people moving on from a care setting including
additional support available via Social Work’s Throughcare and Aftercare team in close
partnership with Housing Services.
• Improvements to the council’s long standing housing pathway planning approach through
review of processes and co-production with staff and service users. The revised client led
approach, based on person centred planning principals will be implemented during 2022/23. 
Quote from Blue Triangle tenant: 
‘I can’t thank you enough for believing in me, for showing me that I am capable of much more than
the life I was living. I now have belief in myself and self-worth. I am planning a future that I didn’t
know I was capable of until now’ 
73

Page 74

20 
Priority Objective 3: Improve and increase the provision of housing support for
households to live independently within the communities  
• There has been a 4% increase in tenancy sustainment levels for council tenants since
2019/20. This is in part due to the support from the HomeStart Team and a focus on assisting
new council tenants in South Lanarkshire, (including those at most risk of or who have
experienced homelessness), to sustain their tenancy.  In the last year, the HomeStart team
provided information, advice and practical assistance to new tenants, including 217 starter
packs helping set up a comfortable home. Since the introduction of the service and with the
input of valued third sector partners there has been a 15% reduction in the number of
tenancies coming to an end within the first 12 months.
• Improved integration of housing support services - Partnership work with Salvation Army,
Turning Point, Blue Triangle Housing Association and Right There has supported the
continued development of the pathway planning approach which ensures the provision of
innovative housing support projects across South Lanarkshire.  All congregate living temporary
accommodation projects offer quality, person centred support in a “psychologically informed
environment”. Support is designed to build personal resilience, strengthen social networks, and
empower service users by increasing life skills to support tenancy sustainment. An Intensive
Floating Support service is also provided to households with multiple and complex needs.
• Three specialist posts have been made permanent to continue to deliver a positive Personal
Housing Planning approach for vulnerable groups including women experiencing domestic
abuse, care leavers, and the continued implementation of SHORE standards for the prevention
of homelessness on release from prison. 
Priority objective 2: Significantly reduce time spent by households in temporary
accommodation and minimise moves before moving to a settled home 
• A further 25% reduction in the number of households who have spent more than 12 months in
temporary accommodation. Despite the challenges of the pandemic this figure has continued
to reduce and since 2019/20 there has been a 65% reduction in long term homelessness from
120 in 2019/20 to 42 in 2021/22
• A 21% reduction in time spent in temporary accommodation from an average of 226 days in
2020/21 to an average of 181 days in 2021/22.This not only reflects improvements on a very
challenging year but sees a 9.5% reduction compared against pre-pandemic levels.
• An increase in the number of temporary tenancies which were ‘flipped’ to a Scottish Secure
Tenancy, providing the homeless household with a permanent home, and avoiding the need
for the disruption of further moves. A total of 75 tenancies have been flipped since 2019/20 
• The Council and its HomeFinder Registered Social Landlord (RSL) partners continue to
maximise the percentage of lets to be directed to those on the Homeless List. In 2021/22, 53%
of council properties were let to homeless applicants. HomeFinder RSLs collectively let 33% of
vacant properties to homeless households. 
• There continues to be a low incidence of rough sleeping in South Lanarkshire, however an
action plan has been developed and there will be a continued focus throughout 2022/23 on
raising awareness of the availability of assistance, including access to temporary
accommodation on a 24-hour basis and there being no need for anyone to sleep rough in
South Lanarkshire. 
74

Page 75

21 
Priority Objective 3: Improve and increase the provision of housing support for
households to live independently within the communities  
• Ongoing partnership approach to delivering housing pathway approach to preventing
homelessness or appropriately responding minimising any negative impact for those fleeing
domestic abuse.  This approach, involving Housing and homeless, wider corporate partners,
Women’s Aid South Lanarkshire, and East Dunbartonshire links to wider objectives of the
South Lanarkshire Gender Based Violence Partnership. The council is also committed to “The
Make a Stand” pledge developed by the Chartered Institute of Housing in partnership with
Women's Aid and the Domestic Abuse Housing Alliance. 
• Improvements to integration were achieved through a pilot Out of Hours Crisis Response
Service delivered through RRTP and ADP funding and operated by Turning Point Scotland.
This project provided key learning for the introduction of a new ADP commissioned service
aimed at meeting support requirements for individuals with multiple and complex needs and
particularly those who are harder to reach and engage with through mainstream statutory
services.
• The Complex Needs Discussion Panel continues to meet to consider the individual
circumstances of homeless households with multiple and complex needs for whom a suitable
housing and support plan has not been agreed or requires additional partnership input.to
ensure the persons needs are met and their homelessness resolved.  The lead officer tracks
progress to ensure housing support is not withdrawn, and that every option is explored to meet
support needs and secure permanent sustainable accommodation as quickly as possible.   
Case Study: Emergency First Stop Accommodation Service User (Eva Burrows,
Cambuslang)
This long established project supports and works well with a range of community partners  
During the  year staff and service users worked to  ensure strong relationships with the
Community Links Service and have been involved in online meetings regarding activities to
promote confidence and enhance mental health well-being.
One service user explains: -
“I have done this so many times, and your input and support has made me see sense.  I
want my life back and things seem to be going right for once.  You believed in what I could
achieve, and I am getting there”. 
75

Page 76

22 
Priority Objective 4: Expand the scope and capacity of our Housing First
approach to be the first response for households with multiple complex needs
• The Salvation Army has been commissioned to work in partnership with South Lanarkshire
Council on the councils Housing First approach. During 2021/22, permanent accommodation
with “wraparound” intensive support was provided to 11 service users. The support provided
is flexible, tailored to the needs and circumstances of the service user and includes a 2-week
induction prior to moving in. This includes advice on budgeting, benefit entitlement,
managing utility bills as well as introducing the service user to community groups and
facilities in the local area.  This support has helped to ensure an 82% tenancy sustainment
rate for the Housing First cases in 2021/22. Reduced availability of housing in the last year
has impacted on timescales to secure settled accommodation however this will be an
ongoing focus of the Housing First programme.
• Wider access to directly provided and commissioned services across the partnership has
supported the Housing First approach, complementing Salvation Army activities or directly
delivering key worker support.
• A specialist Housing Officer position has been made permanent within the establishment to
allow continuation of the Sustainable Housing on Release for Everyone (SHORE) standards,
during 2021/22 the lead Officer contacted 396 individuals who were detained to discuss their
housing circumstances and options before planned release of which 
o  111 requests were refused by service users, 
o 212 requests were accepted and closed with advice and information provided 
o 73 cases required more detailed intervention from the officer to assist with
securing accommodation on release, 
o 28 individuals were assisted to complete a homeless application prior to liberation  
o Interim accommodation was available in all 28 cases and only 1 homelessness
presentation was made. 
Case Study: Housing First Service User 
The Salvation Army’s Housing First project is now into its second year and has had great
success.  Positive success rates are being achieved through Service Users engaging in full
lifestyle changes, engaging in the community, and attending meetings to enhance positive
changes with support.
The staff have continued to build on Partnership relationships and engage well with Harm
Reduction, Addiction and Mental Health Services and are continuously linked to cover all gaps.
The team continue to engage with SLC and now have planned joint support visits so there can
be easily identified routes of support via housing and intensive support.
One service user explains: -
“I thought all I needed was a house, but you have saved me so many times and look at
what I have done.  I have a home that is mine and you could not be any more of a
diamond to me.  Thank you” 
1st 
76

Page 77

23 
Priority Objective 5: Enhance integration and partnership working to
embed RRTP through a whole systems approach
• A key feature of the RRTP is the continued use of Partner Contribution Statements
(PCS). These live documents detail the progress of each partner’s support to the
RRTP by setting out details of specific contributions they will make, individually or in
conjunction with other partners, towards ensuring delivery of the five priority objectives.
The actions detailed within PCS’s are wide and varied reflecting the different roles of
partners and the services they deliver. Regular update on partner services is provided
to the Homelessness Strategy Group which improves knowledge and understanding of
the role of each partner and promotes best practice and consistency for governance of
the plan. 
• The Homelessness Strategy Group, a sub-group of the LHS Steering Group has
collective responsibility for developing and delivering RRTP outcomes, taking account
of the voice of lived experience.  The group meet every eight weeks to monitor
progress against the RRTP action plan and discuss any issues. The group reports
quarterly to the LHS Steering Group.
• SLC Housing Services continues to work closely with partners in the Health and Social
Care Partnership to develop and progress specific ‘Directions’ within the Strategic
Commissioning Plan 2022-25. These unique Directions aim to promote homelessness
routine enquiry across frontline health services and prioritise access to services for
homeless households, including the introduction of a health and wellbeing assessment
for all children affected by homelessness, this is an opportunity to capitalise on existing
pathways from health to housing and homelessness services and places South
Lanarkshire in a good position to respond to the recommendations of the Prevention
Review Group.
• The council has also successfully agreed an information sharing arrangement with the
National Health Service enabling data trend analysis to understand links between
health and homelessness data with a view to aiding preventative activity. 
• Supported by ADP, Housing Services delivered an out of hours crisis response Service
focused on harm reduction and reducing deaths in the homeless population. This pilot
service, administered by Turning Point Scotland achieved priority outcomes and
provided key learning points through 2021/22, the test project helped inform a new
ADP commissioned outreach service aimed at supporting those with multiple and
complex needs, particularly hard to reach or disengaged from mainstream or statutory
services with a continued aim of reducing harm and risk
• Participation in the Healthcare Improvement Scotland project, Reducing Harm,
improving Care which mapped key services across five local authority areas and will
provide key learning for the future development of consistent services across Scotland. 
77

Page 78

24 
4.5 Key Areas for Improvement
4.5.1 Progress is being made with 96% of indicators within the RRTP Action Plan being on target
or close to target, however there are seven indicators across the five priority objectives that
have been allocated an amber status and these will continue to be areas of focus and
improvement during 2022/23. 
4.5.2 Table A below provides the context as to why they continue to be monitored. 
Table A – Amber Measures
Reference Measure Comment
M1.1 The number of homeless
Presentations
Increased from baseline of 1928 to 2138 in
2021/22 however there is a downward trajectory
from the peak figure of 2225 in 2020/21. This
indicates that demand for homelessness
assistance may be returning to pre-pandemic
levels and is on target for a 10-20% reduction
by the final year of the RRTP. This action will
remain amber and be a particular focus of
partnership attention in 2022/23
M1.5 Increase the number of
landlord accredited
properties
Through the Private Landlord Forum, private
landlords are encouraged to take up training
offered by Landlord Accreditation Scotland.
Four online training sessions were delivered in
2021/22. This measure will remain at amber
during 2022/23 to monitor the five-year
objective of increasing the number of landlords
by 9% on the baseline by 2024.
M1.6 Number of households
whose housing needs are
met in the private rented
sector
A total of 35 households had homelessness
duty discharged to the private sector which
remains a sector the council is keen to unlock.
Right There have reported that demand for
private rented properties remains high however,
they continue to raise awareness of services to
private landlords and remain confident that they
can maximise opportunities to overcome the
financial barriers to accessing and/or
maintaining accommodation in the private
rented sector through the provision of a
Guarantee Deposit Bond and the Innovation
Fund
M2.3 Percentage of homeless
households provided with a
Scottish Secure Tenancy
South Lanarkshire Council housing allocations
to 1154 homeless households (53.3% of total
allocations) is lower than the year end position
for 2020/21 (61%), however the figure remains
improved from the RRTP baseline (49.2%) and
there is confidence that over the next two years
there will be an upward trajectory to optimise
the target figure of 50-60%.
78

Page 79

25 
Reference Measure Comment 
M2.7 Percentage of homeless
presentations which are
repeated within 12 months
Increased on the baseline figure of 4.9% to
5.6%. This continues to be an area of focus and
monitoring detailed analysis is being undertaken
of the profile of repeat homelessness to identify
trends and determine further actions to be taken
to reduce to 3% during the term of the RRTP 
M4.2A Number of Housing First
planning cases handled by
health professional led
multi-agency care
management approach
This measure was updated in the RRTP Annual
Review 2020/21 and approved by H&TR
Committee in June 2021. Progress has been
made during the year raising awareness of
Housing First across the Health and Social Care
Partnership and a test pilot is now underway in
East Kilbride locality to include Housing First
households in regular Housing/Social Work
Liaison meetings and to discuss potential
referrals from out with the Area Housing Teams.
Effectiveness of the pilot will be evaluated and
used as model for full rollout during 2022/23
M5.1 Number of training and
employment pathways for
homeless households
The number of referrals to Employability and
Training services remains low. The reasons
underpinning this are being analysed and work
will continue during 2022/23 to focus on
maximising the employment opportunities
available. to support a positive outcome over
the remaining period of the RRTP 
5.  Proposed Changes to Rapid Rehousing Transition Plan (RRTP)
5.1 The annual review provides the opportunity to assess and report on the progress made
against each of the actions and measures contained within the plan. It also allows for a
general re-examination of the RRTP, to ensure that the objectives, actions, and measures
identified, remain appropriate, relevant, and measurable.
5.2 During the annual review one proposed revised action has been identified. Details of the
proposed change are detailed in Table B below.  Following approval, the revision will be
incorporated into the RRTP action plan for 2022/23. 
5.3 In addition, several minor amendments have been made throughout the action plan to
measures and actions to reflect changes in processes or updated terminology. These do not
impact on the outcomes reported; however, help ensure the RRTP remains up to date and
clear in how it will deliver the intended outcomes. 
79

Page 80

26 
Table B – Proposed Amendments
Ref. Current action/measure Status Ref. Proposed replacement
action/measure (where
appropriate)
A1.5A Monitor progress of the
Private Sector Access
and Sustainment Service
administered by YPeople
Complete A1.5B Support people to
overcome financial barriers
to accessing and sustaining
accommodation in the
private rented sector
through the Private Sector
Access and Sustainment
Service. 
6. Priorities for 2022/23 
6.1 The review also provides an opportunity to set out the key priorities to be progressed over
the next year of the plan. 
6.2 A summary of these to be progressed during 2022/23 are detailed below: -
• Focus on reducing homelessness presentations through positive prevention activity
• Continue to focus on pathways and expand to developing a housing options framework
for young people.
• Continue to deliver affordable homes for social rent in South Lanarkshire in accordance
with the Strategic Housing Investment Programme.
• Through a range of prevention activities and partnership support interventions ensure
that 
o the number of families with children presenting as homeless is further reduced
and 
o the length of time households with children who experience homelessness is
reduced
• Raise awareness and preparation for young people leaving home through partnership
with education delivering homeless and housing options awareness film to every
secondary school in South Lanarkshire as part of the curriculum 
• Further reducing long term homelessness through the delivery of affordable housing in
line with the Strategic Housing Investment Plan and by converting or “flipping” temporary
tenancies into secure tenancies where this best meets the households needs
• Increase the proportion of social housing allocations to homeless households to meet
demand and reduce the homelessness case backlog 
• Continue focus on prevention, early intervention and mitigating the disproportionate
effect of homelessness on health and well-being. 
• Liaise with the H&SCP for further progressing the two Homelessness Directions
contained in the Strategic Commissioning Plan.
• Implementation of the actions set out in the Temporary Accommodation Strategic Plan
developed to meet strategic priorities relating to the provision of temporary and
supported accommodation. This will include re-provisioning or re-configuring of
supported accommodation to achieve long-term objectives.
80

Page 81

27 
• Complete strategic analysis of homelessness and health data to identify trends in
relation to community mental health contact, psychiatric admission and non-elective
admissions for substance misuse and self-harm. This will inform further actions required  
• Implementation of revised Housing/Social Work joint Throughcare protocol for care
experienced young people in conjunction with service users and Third Sector partners.
• Ensure continuing links to the Local Child Poverty Action Report 2022 are in place to
support and improve outcomes for homeless households with children 
• Continue to support victims of domestic abuse through the implementation of specific
housing pathways. 
• Implement specific housing pathways for individuals on release from prison to ensure
SHORE standards are maintained.
• Continue to develop the council’s Housing First approach by providing suitable secure
accommodation and wraparound support to homeless households with complex needs.
• Increase homelessness prevention through hardship sustainability funding and support
services across all housing tenures
• Continue to focus on provision of good quality trauma informed services to meet a range
of needs, including review of overall support service provision and consideration of
future commissioning arrangements. 
• Consider how a social lettings agency may be implemented within South Lanarkshire to
provide an additional option for affordable, secure housing.
• Increase the number of private landlords registered with Landlord Accreditation Scotland
• Review service user engagement plan ensuring developments are co-produced.
• Continue priorities for digital inclusion by sourcing opportunities for the provision of
digital equipment, online access, and start-up support to homeless households.
• Tackling the wider causes of homelessness, such as the impact of rising cost of living
and ensuring that everyone faced with losing their home receives the right support to
find accommodation that suits their needs. 
6.3 Funding the RRTP during 2022/23
Scottish Government Funding
During 2021/22, the Scottish Government’s Ending Homelessness Together Fund confirmed
a funding allocation of £451,000 each for Year four and five for South Lanarkshire. Partners
agreed that this would be used to further embed and progress the following RRTP actions: -
• The expansion of specialist support services currently provided by Blue Triangle
Housing Association for intensive floating support services to individuals with complex
needs.
• Continuation of funding dedicated officer posts to support victims of domestic abuse.
• Continued support of the Private Sector Access and Sustainment Service and
expansion of the Innovation Fund administered by Right There.
• Continuation of funding dedicated officer posts to support young care leavers
• Continuation of funding dedicated officer to support SHORE standards for individuals
entering and leaving prison.
• The continuation of the Housing First programme.
• The further development of the digital inclusion project Bringing IT Home to improve
digital connectivity for homeless families.
• Additional funding from the Scottish Government’s EU Poverty and Inclusion fund will be
utilised to increase funding for the HomeStart project providing valuable practical
assistance to new tenants
81

Page 82

28 
Other Funding Sources
The Homelessness Strategy Group is aware of the need to consider other potential funding
routes to meet future resourcing requirements of the RRTP. Partners have committed to
work collaboratively to identify funding opportunities in 2022/23.
82

Page 83

29 
Appendix 1: RRTP Action Plan 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
RRTP Measures Target RRTP
Baseline
Progress
2021/22 Lead
M1.1 Number of homeless presentations Reduce 10-20% 1,928 2,134 HTR
M1.2 Level of Homeless Households (homelessness
caseload at year end)
Reduce 10-20% 892 765 HTR
M1.3 Number of affordable homes added to the housing
supply (new and OMP)
Annual target will be set and
detailed in the Strategic Local
Programme Agreement,
developed between SLC and
the Scottish Government
RSL 283 189 HTR / RSL
SLC 193 468
M1.4 New supply affordable housing suitable to meet
particular needs 
Annual target will be set and
detailed in the Strategic Local
Programme Agreement,
developed between SLC and
the Scottish Government
170 155
HTR / RSL
M1.5 Increase the number of accredited landlord properties +9% from LHS baseline 1,068 1,057 HTR
M1.6 Number of homeless households whose housing
needs are met in the private rented sector
Increase 2020/21 50  35 HTR 
83

Page 84

30 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
Actions Target/Milestone Progress in 2021/22 Lead
A1.1  Set housing supply targets for new
build properties and ensure
contribution to meeting
homelessness needs are
considered in the planning process
Aligned with Strategic
Housing Investment Plan
and the Local Housing
Strategy.  Annual target
will be set and detailed in
the Strategic Local
Programme Agreement,
developed between SLC
and the Scottish
Government.
New build programme progressing in accordance
with South Lanarkshire Strategic Housing
Investment Plan 2022-27 approved by Housing
and Technical Resources Committee in
November 2021.
HTR/RSL
A1.2 Increase number of properties
acquired through Open Market
Purchase (OMP Scheme) to
support conversion of temporary
accommodation to secure tenancies
and rehousing in pressure areas
Annual target to be
agreed in Strategic
Housing Investment Plan. 
53 additional council homes were purchased
through the council’s framework for Open Market
Purchase Scheme. 
HTR
A1.3 Continue to develop and promote
the landlord accreditation scheme
Deliver two private
landlord forums per
annum in partnership with
the Landlord
Accreditation Scotland 
South Lanarkshire Council has continued to
promote the accreditation scheme at forum
meetings and the Council’s websites. There are
1057 registered landlords in South Lanarkshire.
HTR
A1.4 Provide funding to incentivise
landlords to access accreditation
and training from Landlord
Accreditation Scotland
Annual fees provided and
accreditation monitored
The council continues to fund and work in
partnership with Landlord Accreditation Scotland
who provide training to private landlords. The
accreditation scheme is free to join and once
accredited, landlords are required to attend one
training session per year. 
HTR
84

Page 85

31 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
Actions Target/Milestone Progress in 2021/22 Lead
A1.5A Expand the Private Sector Access
and Sustainment Service
administered by Right There
Monitor effectiveness of
increased capacity and
widening scope of
service delivery
Right There (formally Ypeople), via direct contact
or referral, provide expert advice and assistance,
assessing housing need, risk to tenancy
sustainment in particular financial risk and assist
households access and sustain private sector
accommodation where this is a viable longer
term housing option. 
To expand access to the sector the project has
proactively fostered positive relationships with
private sector landlords and agents to expand
opportunities for households to access the
market.
In 2021/22 £22,910 of financial assistance was
provided through Guarantee Bonds in place of a
cash deposit
HTR /Right
There
A1.6A Deliver and continue to develop 
Private Sector Innovation Fund
administered by Right There -
providing financial support to
private rented tenants to prevent
homelessness 
Service continues to be
delivered in accordance
with commissioning
contract 
Routine monitoring arrangements in place 
The Innovation Fund administered by Right 
There's Private Sector Access and Sustainment
Fund (PSASS), has seen increased demand. A
total of £6,175 has been administered in financial
assistance. A total of 92 people with covid
related rent arrears through the Scottish
Government Covid-19 Tenant Grant Fund. The
team worked with existing clients, landlords and
letting agencies as well as working with any
accredited landlord in South Lanarkshire to
access the fund for the prevention of eviction due
to covid related rent arrears. £173,082 in
payments have now been administered. Right
HTR/ Right
There
85

Page 86

32 
There provide a monthly performance report
which is monitored routinely for appropriate
action.
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
Actions Target/Milestone Progress in 2021/22 Lead
A1.7A Continue to develop and implement
approaches to prevent youth
homelessness, with a particular
focus on pathway approach to
meeting the needs of care
experienced young people 
Continue to deliver
personalised and
planned approach to
provision of housing for
young people leaving
care 
New Pathway Approach
implemented by March
2023 
Housing pathway now well established across
partnership. During 2021/22 46 new throughcare
housing applications were received, 43 young
people housed in the year and the average age
was 20 years old. One tenancy ended within the
year resulting in a tenancy sustainment rate of
96%. 
1st draft of broader youth housing options
framework developed, to be progressed and
tested in partnership with service users, housing
staff and partners during 2022/23. 
HTR
A1.8 Continue to develop and implement
approaches to support victims of
domestic abuse and prevent
homelessness 
Enhance the
development of the
housing pathway for
victims of domestic
abuse and considering
legislative changes and
good practice 
Housing Pathway process for domestic abuse
group working well, small numbers during
2021/22 however positive outcomes include
securing alternative accommodation, staying put
following safety planning interventions and 2
planned homeless presentations as customers
preference as best way forward. 
Action plan progressing in relation to
commitment to The Make a Stand pledge
developed by the Chartered Institute of Housing
in partnership with Women's Aid and the
Domestic Abuse Housing Alliance. 
86

Page 87

33 
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes
RRTP Measures Target RRTP
Baseline
Progress
2021/22 Lead
M2.1 Temporary Accommodation Supply Temporary Accommodation
Strategic Plan Developed
and to be implemented over
remaining period of RRTP.
Annual target for units to be
set from March 2023
Units 530 Units 609  HTR
M2.2 Percentage of social housing allocated to homeless
households by all social housing providers in South
Lanarkshire
50-60%
Set target subject to annual
review
49.2% SLC
29.4% RSL
53.05%
32.80%
HTR/RSL
M2.3 Percentage of homeless households provided with a
Scottish Secure Tenancy (SST)
Maintain/improve on LHS
baseline of 61.2%
61.2% 53.30% HTR
M2.4 Percentage of former homeless households provided
with an SST that maintain their home for more than 12
months
Maintain/improve on LHS
baseline of 88%
88% 91.9% HTR
M2.5 Average time spent in temporary accommodation Reduce from 192 days 192 days 181 days HTR
M2.6 Number of temporary accommodation units converted
to SST
Up to 100 units converted
over 5-year period 
21 units
(75 in total)
HTR
M2.7 Percentage of all homeless presentations which are
repeated (within 12 months)
Reduce to less than 3% 4.5% 5.60% HTR
87

Page 88

34 
M2.8 Number of homeless households who spend more
than 12 months in temporary accommodation
Reduce by 50% on baseline  120 42 (65%
reduction)
HTR   
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes 
Actions Target/Milestone Progress in 2021/22 Lead
A2.1A Maximise the potential for
converting temporary
accommodation to a Scottish
Secure Tenancy where the
property meets the needs of the
household 
Review best practice and
identify suitable
households and units
21 units have been flipped during 2021/22. This
continues to be an area of strategic focus and
Area Teams continue to achieve a balance
between flipping and keeping quality temporary
accommodation in the right places.
HTR
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes 
Actions Target/Milestone Progress in 2021/22 Lead
A2.2 Increase percentage of allocations
to homeless households 
SLC aligned with Local
Letting Plans. 
RSL partners as per
agreed targets
The council continues to allocate between 50%
and 60% of lets to homeless households. Some
RSL HomeFinder partners were below their
individual target. Cumulatively RSL HomeFinder
partners allocated 33% of vacant properties to
homeless households in 2021/22. To support
delivery of the RRTP, the council continues to
work with RSLs to ensure that the necessary  
proportion   of their vacant properties are
directed towards meeting the needs of homeless
households.. 
HTR
88

Page 89

35 
A2.3 Review number of properties
currently used as temporary
accommodation in line with
demand
Reconfigure targets for
temporary
accommodation provision
in 2022/23 subject to
analysis confirmed in
Temporary
Accommodation
Strategic Plan
The development of a Temporary
Accommodation Strategic Plan completed which
included development of a modelling tool for
forecasting targets for temporary accommodation
beyond 2024. See section 2.4 for details. 
Annualised target for number of properties used
as temporary accommodation to be set based
upon plan from 2023/24 
HTR
A2.4 Regularly review rent charges for
temporary accommodation to
ensure it remains a financially
viable option for all homeless
households 
Aligned with
Homelessness Business
Plan 
Progress has been made during 2021/22 with
work ongoing to implement the objectives of the
Temporary Accommodation Strategic Plan which
aims to assess the effectiveness of the current
model in delivering successful outcomes by area,
property size and support provision and
undertake forecasting to support the impact of
achieving RRTP targets on future temporary
accommodation supply and affordability.
HTR
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
RRTP Measures Target RRTP
Baseline
Progress
2021/22 Lead
M3.1 Number of people accessing Housing Options
(prevention) services
1,000 964 1137 HTR
M3.2A Percentage of homeless households who require
support, provided with Housing Support Officer
assistance
Maintain at 100% 100% 100% HTR
M3.3 Percentage of looked after young people accessing
and sustaining accommodation that meets their
needs
Determine baseline 
Increase annually
95% 96% HTR 
89

Page 90

36 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2021/22 Lead
A3.1 Increase housing support service
provision to improve homelessness
prevention and support tenancy
sustainment across all tenures. 
Review current service
provision
During 2020/21 the internal support need
assessment and delivery process was reviewed in
collaboration with staff and service users resulting
in a revised approach, this included the launch of
South Lanarkshire’s wellbeing web in early
2022/23. Range of internal and 3rd sector partners
continue to deliver housing support services, both
in prevention activity and response to
homelessness minimising its impact.
HTR
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2021/22 Lead
A3.2 Increase provision of support from
all services to support new
tenancies, including improvements
to housing starter/furnishing packs
and incentives to encourage uptake
of offers.
Review and develop
Implement and monitor
effectiveness
The HomeStart service was established
permanently during 2021/22.  During the year the
service has continued to assist 681 new tenants
settle into and sustain their new tenancy through
assessing risk factors such as previous eviction or
homelessness and financial risk, offering
information and advice from benefit entitlement,
employment, and training opportunities to
practical support for example around budgeting,
reducing debts and making community
connections. The service includes provision of
starter pack furniture as required; 217 tenants
received this assistance. 
HTR
A3.3 Monitor current Housing Options
approach, and ensure adequate
resourcing to meet any future
increase in demand
Annually monitor
resourcing requirements
and report through
annual review
Year-end prevention targets achieved through
focus on prevention activities and ensuring a
person-centred approach.  
HTR
90

Page 91

37 
A3.4 Deliver Housing Options and
homelessness awareness training
to young people, targeting high
schools in areas identified with high
homelessness rates amongst young
people
Monitor and report  In preparing young people for leaving home in
future and factors to consider, during 2021/22
Officers and Service Users were involved in the
production of a film for distribution to all
secondary Schools in South Lanarkshire.  Service
users enjoyed this experience and considered it
valuable to provide an overview of the impact of
homelessness.
HTR 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2021/22 Lead
A3.5 Review access to Scottish Welfare
Fund with a view to ensuring
effective and appropriate access for
homeless households 
Complete Review 
Implement any actions
from review
Review no longer required as good partnership
working across services with regular liaison
meetings, good communication and awareness of
urgency for homeless households. SWF team
utilised additional funding to increase support to
homeless household aiding sustainment over the
last year. 
Consideration given to dedicated SWF resource
to manage demand from homeless households
utilising additional hardship funding however not
progressed as priority action considering positive
position and other pressing priorities. 
HTR
A3.7 Ensure ‘care experience’ is
identified as a support need for any
young people presenting as
homeless and directed towards
appropriate case managed pathway
Monitor and report  
Use of pathway plan, which complements wider
Children’s plan enables comprehensive person-
centred housing and support planning and
delivery.
HTR
91

Page 92

38 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2021/22 Lead
3.8 Complete a Wellbeing Assessment
for A all children and young people
who are homeless
Monitor and report
(annually)
Continued liaison between Housing and NHS
Lanarkshire Health Improvement team has
allowed progress in development of a process for
wellbeing assessments for children affected by
homelessness through the school nurse service.
A process for a “request for assistance” is now in
place to highlight affected children both to health
visitors and school nurses.
HTR
A3.9 Promote digital inclusion for
households who are homeless
Maximise funding for the
provision of digital
equipment and two year’s
unlimited internet access
for homeless households
Since 2019 104 homeless households and
vulnerable young adults have benefited from the
continued efforts to challenge digital exclusion
through the Bringing IT Home project. Each
household has received a piece of digital
equipment and two years of unlimited internet
access.
HTR
92

Page 93

39 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
RRTP Measures Target RRTP
Baseline
Progress
2021/22 Lead
M4.1 Number of current households receiving Housing
First Support
Phased increase to 40 3 33 HTR
M4.2A Number of Housing First planning cases handled by
health professional led multi-agency care
management approach 
Baseline to be established  - See Action
A4.8
HTR/HSCP 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2021/22 Lead
A4.1 Expand Housing First across South
Lanarkshire
40 cases to be
progressed on period of
RRTP - 2019-24
During 2021/22, an additional 11 households
were housed through Housing First. 
Since Housing First was introduced a total of 33
households have been included within the
programme.  There is currently an 83% tenancy
sustainment rate. HTR
93

Page 94

40 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2021/22 Lead
A4.2 Evaluate Housing First pathfinders
and increase scale/scope of
approach aligned to case
conference criteria and pathways
approach
Evaluation Report to be
completed
To be reported later HTR
A4.3A Complete development of the
Temporary Accommodation
Strategic Plan and progress
implementation
Implement focus of
Temporary
Accommodation Strategic
Plan and reconfiguration
of temporary
accommodation model.
The Temporary Accommodation Strategic Plan
has been developed to meet longer term RRTP
objectives of reducing the use of temporary
accommodation. 
The plan is supported by a e modelling tool
which was developed in 21/22 by independent
consultants to support analysis and inform the
future provision of temporary accommodation. 
A4.4 Work with Scottish Prison Service
and Addiewell prison to implement
SHORE standards for people
entering and exiting prison,
including a priority focus for short-
sentence prisoners on remand.
Explore additional options for
dedicated staff resources
Implementation plan
agreed for
implementation from
2020/21
The evaluation report for 2021/22 is currently in
the process of development.  Test pilot to be
considered for continuation into 22/23.  National
paper due to be published by the Association of
Local Authority Chief Housing Officers.  The
Scottish Government & Scottish Prison Service
are organising a further event to relaunch
updated procedures and share good practice. 
All protocols being adhered to within South
Lanarkshire Council. 
HTR
94

Page 95

41 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2021/22 Lead
A4.5 Increase awareness and increase
training offered to front line
services to support people
impacted by Adverse Childhood
Experiences (ACEs) from being
homeless
Evaluate requirement to
raise awareness of
partners in relation to
ACEs. 
Service Development Sessions have been
delivered to Housing Officers and Housing
Support Officers across operational teams to
raise awareness of trauma and providing a
psychologically informed environment. 
Further trauma training will be delivered during
2022/23.
HTR
A4.6 Identify requirements for intensive
trauma informed and PIE
residential supported
accommodation to meet the needs
of extremely vulnerable groups
Complete scoping report Relevant Housing/Support Officers included in
ACE's and PIE training delivered on partnership
approach across Housing, Health and Social
Care delivered by Right There. Managers
participated in Trauma Informed Practice
awareness. This will continue to be an on-going
focus for partners.
HTR
A4.7 Promote ‘routine enquiry’ across all
health and care services, including
visiting outreach, to identify
housing provision and financial
security
Monitor and report via
Health and
Homelessness Steering
Group 
Continued commitment to improving
homelessness prevention has been achieved
through the publication of the new Strategic
Commissioning Plan (2022-25) will provide
opportunities to improve early intervention where
recognised triggers of homelessness are
identified. 
HTR/HSCP
95

Page 96

42 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2021/22 Lead
A4.8 Prioritise access to general medical
and universal health screening
services for homeless people,
including primary care (GP),
prescribing, dentists, etc
Monitor and report via
Health and
Homelessness Steering
Group
The new Strategic Commissioning Plan
continues the “Direction” to support prioritised
access to health and care services for homeless
households. Arrangements are in place between
housing and the health and care partnership to
progress this Direction in 2022/23. A pilot has
been agreed in the East Kilbride locality with the
aim of full roll out across South Lanarkshire in
2022/23 
HTR/HSCP 
Priority Objective 5: Enhance integration and partnership working to embed RRTP through a whole systems approach
RRTP Measures Target RRTP
Baseline
Progress
2020/21  Lead
M5.1 Number of training and employment pathways for
homeless households 
To be agreed To be agreed 4 FCR 
96

Page 97

43 
Priority Objective 5: Enhance integration and partnership working to embed RRTP through a whole systems approach
Actions Target/Milestone Progress in 2021/22 Lead
A5.1 Work with DWP to further develop
use of discretionary support funding
for homeless households to
undertake appropriate training to
develop skills and resilience to
improve access to employment
Agree pathways for
accessing discretionary
support with DWP
DWP continue to work with the council and a
range of third sector organisations on a local level
to ensure claimants who are homeless/at risk of
homelessness are offered relevant and timely
support.
HTR/DWP
A5.2 Explore options for improving digital
connectivity for all homeless
households, increasing
engagement with services, and
enabling improved tenancy
management
Explore options for
expansion of project
Utilising RRTP funding, the Bringing IT Home
project was expanded. Since 2019 104 homeless
and vulnerable households have been provided
with digital devices and unlimited internet access
for 2 years,
HTR
A5.3 Ensure effective training for staff is
in place on awareness of the third
sector support available to people
at risk of homelessness in each
locality 
Implement improvements
as required
VASLAN continue to be represented within the
RRTP partnership for raising awareness of third
sector support within South Lanarkshire.  TS
A5.4 Contribute to ongoing development
and review of homelessness
business plan to ensure sufficient
resources available to continue to
provide high quality services to
homeless households
Implemented
recommendations as
required
Progress against Homelessness Business Plan is
monitored on an ongoing basis throughout the
year, through monthly performance report and at
mid-year and year-end review.  HTR   
97

Page 98

98

Page 99

Report
Agenda Item 
Report to: Housing and Technical Resource Committee 
Date of Meeting: 10 August 2022
Report by: Executive Director (Housing and Technical Resources)
Executive Director (Finance and Corporate Resources )  
Subject: Housing Allocation Policy – Medical Assessment 
1. Purpose of Report
1.1. The purpose of the report is to:- 
♦ seek approval to increase the Housing Services establishment by 1 FTE Strategy
and Policy Officer, to support the revised medical assessment approach. 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that 1.0 FTE Strategy and Policy Officer is added to Housing Services
establishment, as detailed in section 5. 
3. Background
3.1. The revised Housing Allocation Policy was approved by Housing and Technical
Resources Committee on 20 March 2019 and introduced in May 2019.  The policy is
subject to ongoing monitoring to ensure that its aims are being met.  The policy
includes provision for applicants’ medical circumstances to be assessed and
considered within the assessment of their housing need.  The medical assessment
service is currently carried out by an independent medical adviser and provides an
assessment of an applicant’s medical needs in relation to an application for housing
(including appeals) and homelessness applications. 
3.2. The service has been delivered through the current service provider for over 20
years and is due to end in March 2023.  The provider has confirmed it will not be in a
position to continue to provide the service after this point.  Whilst the contract has
been routinely subject to open procurement it has over the period, however,
attracted little or no interest from alternative providers. 
3.3 In this context, on 8 December 2021 Housing and Technical Resources Committee
approved a minor change to the Allocation Policy to support any required change in
approach.  A revised approach has now been identified (see section 4 below) which
requires the addition of a Strategy and Policy Officer to the Housing Services 
establishment.  This Officer will work with colleagues in the Health and Social Care
Partnership to carry out the medical assessment function. 
4. Proposed Approach to Medical Assessment 
4.1. An appraisal of alternative approaches to the medical assessment function has been
completed by staff from Housing and Technical Resources and the South
Lanarkshire Health and Social Care Partnership (H&SCP). 
12
99

Page 100

4.2. The exercise appraised that a joint approach by Housing and Health staff was the
preferred medical assessment service model.  Furthermore, it was considered that
the Health Professional role would be best carried out by an Occupational Therapist. 
This profession has the appropriate training and skills to assess whether an
applicant’s current home could be adapted or equipment provided, to make it
suitable to their physical needs and are also trained in assessing mental health and
developmental needs. 
4.3. Work to develop the new approach is currently being progressed and it has been
confirmed that the Housing input to the service cannot be delivered from within
existing resources.  It is therefore proposed to recruit an additional Strategy and
Policy Officer who will have specific responsibility for medical assessments and
supporting wider joint working with the Health and Social Care Partnership. 
5. Employee Implications
5.1. The following post should be added to the establishment: 
Post Grade/SCP Hourly
Rate
Annual
Salary
Gross Cost (inc on costs
31.5%)  
Strategy  and
Policy Officer 
(Medical
Assessment)
Grade 3 Level
2 - 4 SCP 63 -
74
£18.44 – 
£21.46
£33,651
- £39,162
£44,268 – £51,518 
6. Next Steps
6.1. A plan has been developed detailing the key actions required to ensure the
implementation of the new medical assessment service model by the end of March
2023.  This will include arrangements for the recruitment and management of the
Housing and Health professionals, as appropriate. 
6.2. It is proposed that the current service will continue to operate alongside the new
service for the first 3 months to enable a seamless transition and ensure the new
model is delivering on anticipated outcomes. 
7. Financial Implications
7.1. The costs of establishing the new post will, in part, be off-set against the annual cost
of the existing service which amounted to £16,866 in 2021/2022.  The remaining
amount, £34,652, will be met from within existing Housing Revenue Account budget. 
8. Climate Change, Sustainability and Environmental Implications
8.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
8.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no strategic
environmental assessment is required. 
9. Other Implications
9.1. There are no additional risks associated with this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
100

Page 101

Annette Finnan
Head of Housing Services 
(Housing and Technical Resources) 
15 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 We will work to put people first and reduce inequality
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Good quality, suitable and sustainable places to live 
List of Background Papers
 Report to Housing And Technical Resources Committee 8 December 2021 - Housing
Allocation Policy – Local Letting Plans 2022/2023
 South Lanarkshire Council Allocation Policy 
Contact for Further Information
If you would like further information, please contact:- 
Cameron Mitchell, Strategy and Support Manager
E-mail:  cameron.mitchell@southlanarkshire.gov.uk 
101

Page 102

102

Page 103

Agenda Item 
Report 
Report to: Housing & Technical Resources Committee
Date: 10 August 2022
Report by: Executive Director (Housing and Technical Resources)
Subject: Disposal of Vacant Domestic Dwelling House at 1
Newhousemill Cottages, Newhousemill Road, East
Kilbride, G74 2LD 
1. Purpose of Report
1.1. The purpose of the report is to:- 
♦ request approval to declare the vacant dwelling house at 1 Newhousemill
Cottages, Newhousemill Road, East Kilbride, surplus to the operational
requirements of Housing Services and progress its disposal 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the vacant property at 1 Newhousemill Cottages, as shown on the
attached plan, be declared surplus to the operational requirements of Housing
Services
(2) that the Executive Director (Housing and Technical Resources) be authorised
to deal with disposal of the property from the Housing Account through the
Council’s normal surplus property procedure
(3) that the Executive Director (Housing and Technical Resources), in
consultation with the Head of Administration and Legal Services, be
authorised to conclude all matters in respect of any subsequent disposal and
enter into the necessary legal agreements in terms which are in the best
interest of the Council 
3. Background
3.1. The property at 1 Newhousemill Cottages, East Kilbride was acquired by East
Kilbride District Council from East Kilbride Development Corporation in December
1995 and transferred to South Lanarkshire Council at Local Government Re-
organisation.  It comprises a 1 bedroom, end terraced, non-traditional, sandstone
cottage which is unique in terms of the Council’s current residential property portfolio
in the East Kilbride area. 
3.2.  The property’s construction type differs from the remainder of the housing stock and
is adjoined to similar, terraced, sandstone cottages that are now wholly, privately
owned.   
3.3. The property has been upgraded, in part, through the Housing Investment
Programme, however, requires significant investment if it is to meet Scottish Housing
Quality Standard.  The previous tenancy has ended and the property is currently
vacant.  Disposal of the asset is considered to be the preferred solution in terms of
property management.
13
103

Page 104

3.4.  It is recommended that the property be declared surplus and the Asset and Estates
Section be instructed to market the property for sale on the open market. 
4. Employee Implications
4.1. There are no employee implications arising from this report. 
5. Financial Implications
5.1. Disposal of the property will generate a capital receipt which will contribute to the
Housing Account’s capital investment programme.  A Home Report will be required
prior to marketing and it is anticipated that the property will generate a high level of
interest. 
5.2. Disposal of this property will reduce the Council’s liability in terms of management,
investment and maintenance. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no climate change, sustainability, environmental or risk implications in
terms of the information contained within this report. 
7. Other Implications 
7.1. There are no other implications contained within this report. 
8. Equality Impact Assessment and Consultation Arrangements 
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
7 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Good quality, suitable and sustainable places to live 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
104

Page 105

105

Page 106

106

Page 107

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Notification of Contracts Awarded 
1 November 2021 to 30 June 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to the Committee of contracts awarded by Housing and
Technical Resources for the supply of Goods, Services and Works, following
formal tendering in excess of £50,000 during the period 1 November 2021 to 30
June 2022.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r]
(1) that the details of the contracts awarded by Consultancy Services in Appendix
A, be noted;
(2) that the details of the contracts awarded by Procurement Team in Appendix B,
be noted; and
(3) that the details of the sub contracts awarded by Building Services in Appendix
C, be noted.
[1recs]
3. Background
3.1. It is a requirement of Clause 21.8 of the Standing Orders on contracts that details of
the acceptance of all tenders above £50,000, be reported retrospectively to the
relevant Committee for noting other than those under Clause 21.3 where the award
is not the lowest in a price only tender or costs exceed the approved financial
provision.  In these instances, a report is submitted to the appropriate Committee
and subsequent authority to award is granted by that Committee. 
4. Contracts Awarded
4.1. A full list of the contracts is provided in the appendices to this report. 
5. Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. Appropriate budgetary provision is available for each of the contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1 There are no climate change, sustainability or environmental implications in terms of
the information contained within this report. 
14
107

Page 108

8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There is no requirement to undertake any consultation in relation to the content of
this report. 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
8 July 2022 
Link(s) to Council Values/ Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 8 December 2021. 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Derek Craig, Property Manager (Consultancy Services)
Ext:  845 3517 (Tel:  01698 453517)
E-mail:  Derek.Craig@southlanarkshire.gov.uk 
108

Page 109

Appendix A 
Contracts Awarded (Consultancy Services) 1 November 2021 – 30 June 2022 
Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Housing HOD011750
Shawlands Crescent Travellers
Persons Site, Larkhall –
Groundworks
Joseph Leckie Sons
Contracts Ltd Groundworks £486,503.56 05/11/2021
Housing HOD011526
External Wall Insulation and
Re-Roofing in Burnbank and
Carnwath
AC Whyte & Co Ltd External Wall Insulation and Re-
Roofing £2,039,764.79 16/11/2021
Housing HOD011348 Strathcona House - Internal
Area upgrade SLC Building Services Internal upgrade   £446,368.93 02/12/2021
Housing HOD011684 Strathclyde Path, Uddingston
- Retaining Wall
Landscapes and Contracts
Ltd Retaining Wall £101,717.34 26/01/2022
Housing
General
Fund
HGF011822 SLC Headquarters - Floor 2
Ancillary Moves SLC Building Services Floor 2 Ancillary Moves £127,831.72 28/01/2022
Housing HOD010523.040
Reinstatement Works 44-60 &
62-78 Main Street, East
Kilbride
Cruden Building & Renewals
Ltd
Reinstatement Works 44-60 &
62-78 Main Street, East Kilbride £442,218.75 25/02/2022
Education EDD011127
New Build Primary School,
Nursery & Sports Facility,
Jackton
Hub South West Scotland
Ltd 
New Build Primary School,
Nursery & Sports Facility,
Jackton
£14,892,187.12 08/03/2022
Housing HOD011682 26 Rosslyn Avenue, East
Kilbride SLC Building Services Extension   £199,843.95 25/04/2022
109

Page 110

Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Housing HOD011737 11 & 13 Sweethope Place,
Bothwell SLC Building Services
Internal Alterations and
Conversions to No 11 and 13
Sweethope Place
£210,485.96 27/04/2022
Housing HOD011347.002 Kyle Court, Cambuslang - Fire
Door Replacement CCG (Scotland) Ltd Fire Door Replacement £731,822.42 10/05/2022
Housing HOD011690
Almada Tower, Hamilton -
Emergency Lighting
Replacement
SLC Building Services Emergency Lighting
Replacement £187,179.14 26/05/2022
Housing HOD011350 Bosfield Placed, Sheltered
Housing - Internal Upgrade SLC Building Services Internal Area Upgrade £386,063.56 31/05/2022
Housing HOD011347.003
Clyde, Calder & White Cart
Towers - Fire Door
Replacement
CCG (Scotland) Ltd Fire Door Replacement £1,593,423.72 07/06/2022
Education EDD011478 Uddingston Nursery
Expansion SLC Building Services Nursery Expansion £186,359.20 13/06/2022
110

Page 111

Appendix B
Contracts Awarded (Procurement Team) 1 November 2021 – 30 June 2022 
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/HTR/21/298
CEEF Solar Panel Install - SXL
Electrical Materials Framework,
Lot 7 2021-22
CCL Components Ltd Solar Panel Installation £90,595.38 05/11/2021
SLC/PS/HTR/21/121
Service, Maintenance and Repair
of Closed Protocol Lift
Installations
Orona Ltd  Lift Installation Works £605,020.00 16/11/2021
SLC/PS/HTR/20/257 Lift Upgrade at Deer Park
Sheltered Housing ADL Lift Services Ltd  Lift Upgrade £78,048.60 18/11/2021
SLC/PS/HTR/20/261 Lift Upgrade at Parker Place
Sheltered Housing ADL Lift Services Ltd Lift Upgrade £65,395.05 18/11/2021
SLC/PS/HTR/21/091 Design, Supply, and Installation
of Fire Doors - Towers CCG (Scotland) Ltd Replacement Fire Doors £8,406,000.00 21/12/2021
SLC/PS/HTR/21/179 Roberton Hall Refurbishment
Works Maxi Construction Ltd Refurbishment of Robertson Hall £190,350.54 13/01/2022
SLC/PS/HTR/21/293 Quick Quote for Life Cycle
Flooring Works Rutherglen Area Muirgroup Interiors Ltd Flooring Works £77,380.00 09/02/2022
SLC/PS/HTR/21/291 Quick Quote for Life Cycle
Flooring Works Hamilton Area 1 Muirgroup Interiors Ltd Flooring Works £50,113.50 09/02/2022
SLC/PS/HTR/21/294
Quick Quote for Life Cycle
Flooring Works East Kilbride
Area
Muirgroup Interiors Ltd Flooring Works £107,040.00 09/02/2022
SLC/PS/HTR/21/236 Maintenance of Air Conditioning
and Air Handling Units
Diamond Air Conditioning
Ltd Air Maintenance  £560,000.00 15/02/2022
111

Page 112

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/HTR/21/390
Back Up Contractor
Refurbishment Works / Aids and
Adaptations
Hugh LS McConnell Refurbishment  £2,000,000.00 01/03/2022
SLC/PS/HTR/21/391
Supply and Delivery of Carbon
Dioxide Monitors to Glenfield
Road EK
BEMCO Ltd Supply and Delivery of Carbon
Dioxide Monitors  £1,777,780.00 07/03/2022
SLC/PS/HTR/21/416 Provision of Manned Security Profile Security Services
Ltd Provision of Manned Security £800,000.00 08/03/2022
SLC/PS/HTR/18/320
Double Glazed Units Supply and
Delivery - Extension of Contract
to 01/04/2024
Strathclyde Insulating
Glass Ltd
Double Glazed Units Supply and
Delivery £384,921.00 10/03/2022
SLC/PS/HTR/19/369
Private Sector Access and
Tenancy Sustainment Scheme -
Extension of Contract to
31/03/2023
YPEOPLE Private Sector Access and
Tenancy Sustainment Scheme £474,180.00 25/03/2022
SLC/HTR/17/512
WQ Management Services
Including Legionella APUC
Framework - Extension of
Contract to 31/03/2024
SOCOTEC UK Ltd
WQ Management Services
Including Legionella APUC
Framework
291837.5 30/03/2022
SLC/PS/HTR/20/272
Supply and Delivery of External
Door Sets and Windows -
Extension of Contract to
31/03/2023
Sovereign Group Ltd Supply and Delivery of External
Door Sets and Windows £1,600,000.00 30/03/2022
SLC/PS/HTR/21/123
Service, Maintenance and Repair
of Closed Protocol Intruder
Alarms
Spie Scotshield Ltd Alarm Security Works £450,000.00 31/03/2022
SLC/PS/HTR/21/122
Service, Maintenance and Repair
of Closed Protocol Fire and
Intruder Alarms
FMS Fire & Security Ltd Alarm Security Works £612,110.00 31/03/2022
SLC/PS/HTR/21/369
Service, Maintenance and Repair
of Closed Protocol Fire and
Intruder Alarms
Stanley Security Solutions
Ltd Alarm Security Works £298,990.00 22/04/2022
112

Page 113

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/HTR/20/184
Direct Award for the Supply of
Domestic Boilers, Associated
Materials - Extension of Contract
to 01/05/2023
City Plumbing Supplies
Holdings Ltd
Supply of Domestic Boilers,
Associated Materials £4,250,000.00  27/04/2022
SLC/PS/HTR/21/265 Service & Maintenance of
Voltage Optimiser Health Checks SDC Industries Ltd Service & Maintenance of
Voltage Optimisers £90,000.00 03/05/2022
SLC/PS/HTR/21/263 Maintenance of Commercial
Heating Out of Hours Contractor Valley Group Ltd Heating Maintenance £80,040.00 04/05/2022
SLC/PS/HTR/22/079 SLC Maintenance and Contracts
Term Scaffolding Contract Turner Access Ltd Scaffolding  £750,000.00 09/05/2022
SLC/PS/HTR/21/447 Void Property Protection Orbis Protect Ltd Void Property Protection £400,000.00 25/05/2022
SLC/PS/HTR/21/271 Maintenance of Fire Dampers H & V Commissioning
Services Maintenance of Fire Dampers £211,887.00 25/05/2022
SLC/PS/HTR/21/252
Service, Maintenance and Repair
of Closed Protocol CHP Units in
Larkhall Leisure Centre and
Hamilton Water Palace
Centrica Business
Solutions UK Ltd
Service, Maintenance and Repair
Works £11,122,450.00 07/06/2022
SLC/PS/HTR/21/272
Maintenance of Lighting
Columns (Sports Pitches
Floodlighting)
GMA Electrical Ltd Lighting Maintenance  £640,000.00 27/06/2022
SLC/PS/HTR/21/362 
Planned and Preventive
Maintenance and Repair of Pool
Plant Installations and Remedials
CMM Pools Ltd Maintenance and Repair of Pool
Plant Installations and Remedials £958,518.96 30/06/2022 
113

Page 114

Appendix C 
Contracts Awarded (Building Services) 1 November 2021 – 30 June 2022 
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
BSP011791.001 Kirkriggs & Kirkconnell
External Fabric Repairs
Ailsa Building Contractors
Ltd Sub-Contract: Render £115,282.15 22/11/2021
EDD011478 Uddingston Nursery
Expansion
Kentallen Mechanical
Services Ltd
Sub-Contract: Mechanical and
Plumbing £71,109.89 17/06/2022 
114

Page 115

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 10 August 2022
Report by: Executive Director (Housing and Technical Resources)  
Subject: Delegated Authority Report – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise on transactions processed by delegated authority by Property Services
during Quarter 3 and Quarter 4 of 2021/2022 and provide a summary for
2021/2022 as well as for Quarter 1 of 2022/2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the transactions processed by delegated authority by Property Services
during Quarter 3 and the Quarter 4 of 2021/2022 and the summary for
2021/2022 and Quarter 1 of 2022/23; be noted 
3. Background
3.1. The Executive Director (Housing and Technical Resources) has delegated authority
to deal with various transactions, including:- 
 leases of a value up to £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000; and
 acquisitions up to a value of £200,000 
3.2. Delegated authority reports are prepared by case officers and submitted to the Head
of Property Services for approval, once provisional agreement has been reached
with the third party.  A weekly list of approved reports is published on the Council’s
intranet under “Estates Property Transactions”. 
3.3. The delegated reports provide authority for officers to progress transactions and
where appropriate, to instruct Legal Services.  The receipt of any monies arising
from the transactions occurs at a date in the future, once missives have been
concluded and any suspensive conditions met.  It should be noted that some
transactions may never settle. 
4.  Summary Quarter 3, 2021/2022
4.1. The summary of transactions progressed under delegated authority during Quarter 3
of 2021/2022 is shown in Appendix 1, Column 1, however, can be summarised as
follows:-  
15
115

Page 116

Total number of transactions 56 
Total value of lease transactions £61,287 per annum 
Total value of capital transactions £1,292,703 
Total value of miscellaneous transactions £55,001 
5. Summary Quarter 4, 2021/2022
5.1. The summary of all transactions progressed under delegated authority during quarter
4 of 2021/2022 is shown on Appendix 1, Column 2, however, can be summarised as
follows:- 
Total number of transactions 40 
Total value of lease transactions £97,127 per annum 
Total value of capital transactions £486,150 
Total value of miscellaneous transactions £106,650 
6. Annual Summary 2021/2022
6.1. The summary of all transactions progressed under delegated authority during the
financial year 2021/2022 is shown on Appendix 1, column 3 and can be summarised
as follows:- 
Total number of transactions 180     
Total value of lease transactions £599,293 per annum 
Total value of capital transactions £3,587,402 
Total value of miscellaneous transactions £476,651 
6.2.  The overall profile of the volume and value of transactions during 2021/2022
generally compares with previous years. 
7.  Summary Quarter 1, 2022/2023
7.1. The summary of transactions progressed under delegated authority during Quarter 1
of 2022/2023 is shown in Appendix 2, Column 1, however, can be summarised as
follows:- 
Total number of transactions 65 
Total value of lease transactions £114,400 per annum 
Total value of capital transactions £1,083,352 
Total number of miscellaneous transactions £55,500 
8. Employee Implications
8.1. There are no employee implications arising from this report. 
9. Financial Implications
9.1. The rental income to the Council is increased as a result of the new lettings and rent
reviews. 
9.2. Disposals generate additional capital monies for the Council’s Capital Programme. 
9.3. Acquisitions are carried out in accordance with project plans and approved capital
budgets, to enable investment programmes to proceed. 
10. Climate Change, Sustainability and Environmental Implications
10.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
116

Page 117

11. Other Implications
11.1. There is a low risk that the rental and capital receipts identified within these
delegated authority reports are not achieved if, for reasons outwith the Council’s
control, the tenant/purchaser chooses not to proceed with the transactions. 
However, Property Services has in place procedures and consultations intended to
minimise this risk. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. Consultation takes place with the occupying Resource, Planning, Roads and Legal
Services, on a transaction by transaction basis as and when required. 
12.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
Daniel Lowe
Executive Director (Housing and Technical Resources) 
4 July 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 30 June 2021
 Housing and Technical Resources Committee, 8 December 2021 
List of Background Papers
 Plans and drawings of the property involved in these transactions can be obtained from
the Assets and Estates Team, Property Services
 Weekly List of Delegated Authority Transactions can be obtained on the Council’s
intranet 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
117

Page 118

Appendix 1 
Delegated Authority Transactions 
Transaction Type  Quarter 3
2021/2022 
Quarter 4
2021/2022
Annual Summary 
No  Value No Value No Value       
Lease Renewal 1 £8,500  1 £10,000 6  £268,502       
New Lease 
Landlords Consent
12 
4
£52,786 
£1
19 
5
£84,863 
£0
58 
13
£297,813 
£2       
Assignation 3 £0 2 £0 7 £0       
Rent Review 0 £0 1 £2,264 2 £32,976       
Total Revenue  20  £61,287  28  £97,127  86  £599,293       
Disposal 11 £195,695 2 £4,700 21 £516,312       
Compensation 1 £27,050 0 £0 8 £233,200       
Wayleave/Servitude 6 £1,208 2 £950 16 £23,037       
Acquisition 
Title Waiver
15 
0
£1,068,750 
£0
6
0
£480,500 
£0
43 
0
£2,814,853 
£0       
Total Capital  33  £1,292,703  10  £486,150  88  £3,587,402       
Miscellaneous 3 £55,001 2 £106,650 6 £476,651 
118

Page 119

Appendix 2 
Delegated Authority Transactions 
Transaction Type  Quarter 1
2022/2023 
No  Value   
Lease Renewal 5 £23,300 
New Lease 
Landlords Consent
10 
7
£42,300 
£0   
Assignation 3 £0   
Rent Review 6 £48,800   
Total Revenue  31  £114,400   
Disposal 3 £13,700   
Compensation 6 £13,900   
Wayleave/Servitude 3 £2   
Acquisition 
Title Waiver
16 
0
£1,055,750 
£0   
Total Capital  28  £1,083,352   
Miscellaneous 6 £55,500 
119

Page 120

120