Democracy Spraffa

Agenda Document Pack - Housing and Technical Resources Committee - 26/02/2025

South Lanarkshire Council · 26 February 2025
Back to Housing and Technical Resources Committee — 26 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 18 February 2025 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 26 February 2025
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Davie McLachlan (Chair), Margaret Cowie (Depute Chair), Joe Fagan (ex officio), Walter
Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry Convery, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer, Grant Ferguson,
Alistair Fulton, Ross Gowland, Geri Gray, Ross Lambie, Martin Lennon, Richard Lockhart,
Julia Marrs, Ian McAllan, Kenny McCreary, Norman Rae, David Shearer, Kirsty Williams 
Substitutes
Robert Brown, Poppy Corbett, Monique Equi, Gladys Ferguson-Miller, Elise Frame, Martin
Hose, Cal Johnston-Dempsey, Susan Kerr, Eileen Logan, Richard Nelson, Helen Toner,
Margaret B Walker, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources Committee
held on 27 November 2024 submitted for approval as a correct record.  (Copy
attached) 
5 - 18 
3 Minutes of Special Meeting
Minutes of the special meeting of the Housing and Technical Resources
Committee held on 22 January 2025 submitted for approval as a correct record. 
(Copy attached) 
19 - 22 
Monitoring Item(s) 
4 Revenue Budget Monitoring 2024/2025 - Housing and Technical Resources
- Housing Revenue Account (HRA)
Joint report dated 29 January 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
23 - 26 
5 Revenue Budget Monitoring 20242025 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 29 January 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
27 - 32 
6 Capital Budget Monitoring 2024/2025 - Housing and Technical Resources -
Housing Revenue Account (HRA)
Joint report dated 29 January 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
33 - 36 
7 Capital Budget Monitoring 2024/2025 - Housing and Technical Resources
(excl Housing Revenue Account (HRA))
Joint report dated 28 January 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
37 - 40 
8 Housing and Technical Resources – Workforce Monitoring – October to
December 2024
Joint report dated 31 January 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
41 - 46 
Item(s) for Decision 
9 Housing Allocation Policy – Local Letting Plans 2025-2026
Report dated 23 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
47 - 54 
10  Homeless Pressures Update
Report dated 6 January 2025 by the Executive Director  (Housing and Technical
Resources).  (Copy attached) 
55 - 72
2

Page 3

11  South Lanarkshire Council Housing Repairs Policy
Report dated 13 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
73 - 88 
12  CAT Lease - Hollandbush Golf Course and Clubhouse – Community Asset
Transfer to Hollandbush Golf Club
Report dated 20 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
89 - 94 
13  Dunedin Pitches and Pavilion, East Kilbride – Community Asset Transfer
to EKRFC Dunedin Project Ltd
Report dated 20 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
95 - 100 
14  Raploch Pitches and Pavilion – Community Asset Transfer to Larkhall
Thistle Community Football Club
Report dated 20 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
101 - 106 
15  Eastfield Community Hall  Community Asset Transfer to Eastfield
Community Centre Management Committee
Report dated 20 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
107 - 112 
Item(s) for Noting 
16  Delegated Authority Report – Update
Report dated 14 January 2025 by the Executive Director  (Housing and
Technical Resources).  (Copy attached) 
113 - 116 
Urgent Business 
17  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Lynne Hamilton
Clerk Telephone: 07385 370044
Clerk Email: lynn.hamilton2@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 27 November 2024 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor
Gerry Convery, Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Margaret Cowie
(Depute), Councillor Maureen Devlin, Councillor Colin Dewar, Councillor Allan Falconer, Councillor
Grant Ferguson, Councillor Ross Gowland, Councillor Cal Johnston-Dempsey (substitute for
Councillor Janine Calikes), Councillor Ross Lambie, Councillor Martin Lennon, Councillor Eileen
Logan (substitute for Councillor Kirsty Williams), Councillor Julia Marrs, Councillor Ian McAllan,
Councillor Kenny McCreary, Councillor Norman Rae, Councillor David Shearer, Councillor Helen
Toner (substitute for Councillor Geri Gray) 
Councillors' Apologies:
Councillor Janine Calikes, Councillor Joe Fagan (ex officio), Councillor Alistair Fulton, Councillor
Geri Gray, Councillor Richard Lockhart, Councillor Kirsty Williams 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); J Davitt, Public Relations Team Leader; L Hamilton,
Administration Officer; E A McGonigle, Administration Adviser; D McMillan, Finance Adviser; E
McPake, Human Resources Business Manager; L Wyllie, Administration Assistant
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services; C Jardine, Head of Property
Services; G McParland, Property Manager (Assets and Estates); C Mitchell, Strategy and Support
Manager; J Read, Strategy and Policy Adviser 
1 Declaration of Interests
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Housing and Technical Resources Committee held on 18
September 2024 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record 
3 Revenue Budget Monitoring 2024/2025 - Housing and Technical Resources - (Excl
Housing Revenue Account (HRA))
A joint report dated 30 October 2024 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April to 4 October 2024 and
providing a forecast for the year to 31 March 2025 for Housing and Technical Resources (excl
HRA).
2
5

Page 6

A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to D of the report. 
As at 4 October 2024, the projected outturn position for the Resource was a breakeven position. 
Virements were proposed to realign budgets and those were detailed in appendices C and D to
the report. 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position on the Housing and Technical
Resources’ Revenue budget (excl HRA), as detailed in Appendix A to the report, be noted;
and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 18 September 2024 (Paragraph 5)] 
Councillor Cooper joined the meeting during this item of business 
4 Revenue Budget Monitoring 2024/2025 - Housing and Technical Resources
Housing Revenue Account (HRA))
A joint report dated 30 October 2024 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April to 4 October 2024 and
providing a forecast for the year to 31 March 2025 for Housing and Technical Resources (HRA). 
As at 4 October 2024, there was a forecast breakeven position against the budget, as detailed in
Appendix A to the report. 
Virements were proposed to realign budgets and those were detailed in Appendix A to the
report. 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position on Housing and Technical
Resources’ (HRA) revenue budget, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 18 September 2024 (Paragraph 6)] 
5 Capital Budget Monitoring 2024/2025 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 30 October 2024 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted providing information on the
progress of the capital programme for Housing and Technical Resources (excl HRA) for the
period 1 April to 4 October 2024.
6

Page 7

The revised budget of £10.629 million was based on the overall Capital Programme for
2024/2025 approved by the Executive Committee on 13 November 2024.  Appendix A to the
report detailed a forecast for the financial year of £10.629 million.  Actual expenditure to 4
October 2024 was £0.935 million.   
The Committee decided: that the Housing and Technical Resources’ capital
programme of £10.629 million, and forecast expenditure of
£10.629 million, be noted. 
[Reference: Minutes of 18 September 2024 (Paragraph 10) and Minutes of the Executive
Committee of 13 November 2024 (Paragraph 4)] 
6 Capital Budget Monitoring 2024/2025 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 30 October 2024 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising on the progress of
the capital programme for Housing and Technical Resources (HRA) for the period 1 April to 4
October 2024. 
The Housing Capital Programme for 2024/2025 was £77.248 million, as detailed at Appendix A
to the report.  This budget was based on the original programme approved by the Council in
February 2024, budget carried forward from financial year 2023/2024 and the Scottish
Government Affordable Housing grant available for 2024/2025.  It also included the allocation of 
£1.724 million in Resource Planning Assumption (RPA) for 2024/2025. 
The forecast for 2024/2025 from Housing and Technical Resources had identified an outturn of
£72.106 million for the year, an underspend of £5.142 million.  This was a result of delays in site
starts at 2 locations and the fact that the average purchase price for properties purchased
through the Market Purchase Scheme had reduced. 
Opportunities continued to be explored to utilise the uncommitted £5.142 million in the current
programme.  Any Council funding not utilised would be carried forward into the next financial
year. 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £77.248 million, and expenditure to 4
October 2024 of £22.439 million, be noted. 
[Reference: Minutes of 18 September 2024 (Paragraph 9)] 
7 Housing and Technical Resources – Workforce Monitoring – July to September
2024
A joint report dated 28 October 2024 by the Executive Directors (Housing and Technical
Resources) and (Finance and Corporate Resources) was submitted on the following employee
information for Housing and Technical Resources for July to September 2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 14 September 2024
7

Page 8

The Committee decided: that the report be noted. 
[Reference: Minutes of 18 September 2024 (Paragraph 11)] 
8 Housing and Technical Resource Plan - Quarter 2 Progress Report 2024/2025
A report dated 6 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted on the Housing and Technical Resource Plan Quarter 2 Progress Report for
2024/2025 for the period 1 April to 30 September 2024. 
The Resource Plan measures were rated using a traffic light system of red, amber, or green as
well as blue (BRAG), which indicated that an action had been completed. 
Details were provided on:- 
 progress against all Resource Plan measures contained in the Quarter 2 Progress Report
2024/2025, as detailed in Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in Section 5.3 of the report
 areas for improvement and associated management actions, as detailed in Section 5.4 of 
the report
 the status of those measures identified as ‘report later’ at Quarter 4 2023/2024, as detailed
at Appendix 3 to the report 
An officer responded to members’ questions in relation to:- 
 the supports available to young people being offered tenancies
 whether there had been a stabilisation in the rising rates of homelessness 
The Committee decided: 
(1) that the Housing and Technical Resource Plan Quarter 2 Progress Report 2024/2025, as
summarised at Section 5.2 and detailed in Appendix 2 of the report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in Section 5.3 of the
report, be noted; 
(3) that the areas for improvement and associated management actions, as detailed in
Section 5.4 of the report, be noted; and 
(4) that the additional scrutiny of reporting the updated status of those measures identified as
‘report later’ at Quarter 4 2023/2024, as detailed in Section 5.5 and at Appendix 3 to the
report, be noted. 
[Reference: Minutes of 19 June 2024 (Paragraph 5)] 
9 Policy and Strategy Review Schedule
A report dated 8 October 2024 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval for the Policy and Strategy Review Schedule for Housing
and Technical Resources.
8

Page 9

The Policy and Strategy Review Schedule was established in 2011 with regular updates
provided, most recently on 8 November 2023.  It assisted annual service planning by providing a
timeframe for the formal review of all key housing policies and strategies.  It informed the
development of the annual work plan for customer involvement and provided a basis for the
Council to ensure that its statutory obligations were delivered. 
The proposed Schedule reflected changes in the local and national policy context and was
attached as Appendix 1 to the report.  It set out:- 
 details of housing policies and strategies 
 the frequency of reviews
 when the reviews were next scheduled to take place 
As part of the policy and strategy review process, associated procedures, and protocols, which
supported the delivery of services, were also considered, and reviewed as appropriate.  This
ensured that scope for service improvements was also considered as part of the review process. 
The scope of the policy and strategy areas covered by the Schedule was consistent with the key
service areas identified by the Scottish Housing Regulator’s regulatory framework, as detailed in
the report. 
In addition, the review also incorporated key housing and other strategies which the Resource
had lead responsibility for within the Council. 
The Schedule would inform the next round of Resource and Service Plans for 2025/2026 and
would be used to establish a joint programme for customer engagement. 
The proposed frequency of review was considered appropriate to the individual policy or
strategy area.  An updated Schedule would be presented to this Committee on an annual basis
which would advise of progress and any amendments to the Schedule. 
The Committee would continue to be fully updated in relation to the development of the specific
policies and strategies contained within the Schedule. 
The Committee decided: 
(1) that the Policy and Strategy Review Schedule, attached as Appendix 1 to the report, be
approved; and 
(2) that the outcome of policy and strategy reviews be reported to future Committees, in line
with the Schedule. 
[Reference: Minutes of 8 November 2023 (Paragraph 9)] 
10 South Lanarkshire Council's Strategic Housing Investment Plan 2025 to 2030
A report dated 6 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted:- 
 requesting approval for South Lanarkshire Council’s Strategic Housing Investment Plan
(SHIP) 2025 to 2030
♦ providing an update on additional considerations given as part of the development of
South Lanarkshire Council’s SHIP 2025 to 2030
9

Page 10

The SHIP was a rolling 5-year plan, the purpose of which was to set out affordable housing
development priorities within a local authority area, to guide the way in which Scottish
Government funding and other resources were allocated to achieve current South Lanarkshire
Local Housing Strategy 2022 to 2027 outcomes. 
Information was provided on:- 
 the development of the SHIP 2025 to 2030
 the content and key considerations of the SHIP 2025 to 2030, which was attached as
Appendix 1 to the report
 resource planning assumptions for 2024/2025
 the connection of the SHIP to progressive housing through the Affordable Housing Supply
Programme
 the significance of town centre regeneration and the capacity of potential affordable  
housing
 alternative procurement routes 
Officers responded to members’ questions in relation to:- 
 the consideration of the inclusion of modular housing within the SHIP
 the inclusion of the more remote rural areas, with the Head of Housing Services
undertaking to liaise with Planning Services in relation to planning fees
 the timescales for the Ball Green site in Strathaven 
The Committee decided: 
(1) that the Council’s Strategic Housing Investment Plan (SHIP) 2025 to 2030, as detailed in
Appendix 1 to the report, be approved for publication and submission to the Scottish
Government; and 
(2) that the key considerations made as part of the development of the Council’s Strategic
Housing Investment Plan (SHIP) 2025 to 2030 be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 8) and Minutes of the Executive
Committee of 8 May 2024 (Paragraph 11)] 
11 Westwood Community Hall, Riverton Drive, East Kilbride - Lease to Westwood
Community Centre
A report dated 10 October 2024 by the Executive Director (Housing and Technical Resources)
was submitted advising of a request for a concessionary lease of Westwood Community Hall to
Westwood Community Centre. 
Westwood Community Hall was managed by South Lanarkshire Leisure and Culture (SLLC)
and, following a review of its business plan, the SLLC Board announced that it could not sustain
service delivery for the facility and it would be returned to the Council. 
Information was provided on:- 
 the terms of the lease request
 the property requested, as shown on the plan attached as an appendix to the report
 the purpose of Westwood Community Centre
 the proposed use of the hall
 the assessment of the application and proposed terms and conditions of the lease of
Westwood Community Hall to Westwood Community Centre
10

Page 11

The Committee decided: 
(1) that the subjects at Westwood Community Hall, Riverton Drive, East Kilbride be leased to
Westwood Community Centre, subject to the terms and conditions detailed in Section 5 of
the report; and 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters in
respect of the lease and to enter into the necessary legal agreements on terms which were
in the best interests of the Council. 
12 Acquisition of 2 Former Church Sites at Reid Street and Backmuir Road, Hamilton
from JR Group
A report dated 6 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval to acquire 2 former church sites at Backmuir Road and Reid
Street, Hamilton from the JR Group on which 48 affordable housing properties would be
constructed by the JR Group for inclusion in the Council’s housing stock. 
Following the assessment of the JR Group’s proposals and having entered into negotiations with
JR Group to progress those proposals to provide new affordable homes, it was proposed to
acquire the former 2 church sites on which the JR Group would construct 48 affordable housing
properties, subject to the following principal conditions:- 
 the Council would acquire title to the 2 former church sites in exchange for the land
payments (each site being valued at £360,000)
 the balance for each property constructed would then be paid on completion of the
following stages – floor slab, wind and watertight, and completion
 the Council would receive a third-party warranty covering defects and structure for a period
of no less than 10 years
 each party would be responsible for their own legal fees 
Approval for the award of a works contract to the JR Group for the construction of the 48
affordable housing properties on the 2 former church sites would be secured in accordance with
the requirements of the Council’s Standing Orders on Contracts. 
Information was provided on:- 
 the actions the Council had taken to develop housing across South Lanarkshire and meet
its affordable housing supply target, which aimed to deliver an additional 1,300 homes by
March 2027
 the publication of a Prior Information Notice (PIN) which sought proposals from parties that
had access to land for residential development and who would be interested in delivering
affordable housing for the Council
 the proposal from the JR Group through the PIN exercise for 2 former church sites of land
at Reid Street and Backmuir Road, Hamilton 
Officers responded to members’ questions in relation to:- 
 the higher cost of this project in relation to other projects
 the lack of 3 and 4 bedroom houses on the site
11

Page 12

The Committee decided: 
(1) that the acquisition of the 2 former church sites at Backmuir Road and Reid Street,
Hamilton from the JR Group, and the funding package for the acquisition of those sites as
well as the construction by JR Group on those sites of 48 affordable homes for a total price
of £11,850,000 (which included the cost of land), be approved; 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters
pertaining to those transactions and to enter into all necessary legal agreements on terms
which were in the best interests of the Council; and 
(3) to note that the award of a negotiated works contracts to the JR Group for the construction
of the 48 affordable housing units on the 2 former church sites would be secured in
accordance with Council’s Standing Orders on Contracts. 
[Reference: Minutes of 8 November 2023 (Paragraph 8) and Minutes of the Executive
Committee of 30 November 2022 (Paragraph 7)] 
13 Acquisition of Houses at Landsdale, Newhouse Road, East Kilbride (EK CGA Site
D) - Section 75 Planning Reference PL/09/0218
A report dated 6 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval to acquire 56 homes at the Bellway Landsdale Development,
Newhouse Road, East Kilbride from Bellway Homes, for inclusion in the Council’s housing stock
in fulfilment of the planning obligations associated with the development of the residential sites. 
It was proposed to acquire 56 completed houses from Bellway Homes, subject to the following
principal conditions:- 
 the Council would pay a land payment of £1.14 million prior to works commencing and
take ownership of the site
 the balance for each unit would then be paid in the following stages – floor slab, wind and
watertight, and completion
 the Council would receive a third-party warranty covering defects and structure for a period
of no less than 10 years
 each party would be responsible for their own legal fees 
Information was provided on:- 
 the actions the Council had taken to develop housing across South Lanarkshire and meet
its affordable housing supply target, which aimed to deliver an additional 1,300 homes by
March 2027
 the discussions entered into by the Council with Bellway Homes to fulfil the planning
obligations for new affordable homes 
The Head of Property Services responded to a member’s question in relation to the accessibility
of the properties. 
The Committee decided: 
(1) that the acquisition of 56 completed affordable homes from Bellway Homes for a total price
of £11,360,000 (which included the cost of land), to fulfil the planning obligations
associated with the residential development of the sites, be approved; and
12

Page 13

(2) that the Executive Director (Housing and Technical Resources) be given delegated
authority to authorise the transactions and instruct Legal Services to conclude
transactions, in the appropriate manner and in the best interests of the Council, with each
individual transaction being in excess of the current £100,000 acquisition limit under the
existing delegated powers arrangements. 
[Reference: Minutes of 8 November 2023 (Paragraph 8) and Minutes of the Executive
Committee of 30 November 2022 (Paragraph 7)] 
14 Acquisition of Land and Construction of Properties at Dale Avenue, Cambuslang -
Section 75 Planning Reference PL/21/1901
A report dated 6 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval to acquire an area of land at Dale Avenue, Cambuslang from
Dawn Homes, on which 17 affordable housing properties would be constructed by Dawn
Homes, for inclusion in the Council’s housing stock in fulfilment of the planning obligations
associated with the development of this residential site. 
It was proposed to acquire the land on which Dawn Homes would construct 17 affordable
homes, subject to the following principal conditions:- 
 the Council would acquire title to the land in exchange for the land payment (the site being
valued, and payment determined in line with the planning obligations in terms of the
Section 75 Agreement to acquire at 50% market value at £170,000)
 the balance for each property constructed would then be paid in the following stages –
floor slab, wind and watertight, and completion
 the Council would receive a third-party warranty covering defects and structure for a period
of no less than 10 years
 each party would be responsible for their own legal fees 
Information was provided on:- 
 the actions the Council had taken to develop housing across South Lanarkshire and meet
its affordable housing supply target, which aimed to deliver an additional 1,300 homes by  
March 2027
 the discussions entered into by the Council with Dawn Homes to fulfil the planning
obligations in terms of the Section 75 Agreement, as outlined in the report 
The Head of Property Services responded to a member’s question in relation to the building
warranty standard. 
The Committee decided: 
(1) that the acquisition of the area of land at Dale Avenue, Cambuslang from Dawn Homes,
and the funding package for the acquisition of that land and construction by Dawn Homes
on that area of land of 17 affordable homes for a total price of £3.5 million (which included
the cost of land), to fulfil the planning obligations associated with the residential
development previously entered into, be approved; 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters
pertaining to those transactions and to enter into all necessary legal agreements on terms
which were in the best interests of the Council; and 
13

Page 14

(3) to note the award of a negotiated works contract to Dawn Homes for the construction of
the 17 affordable housing units on the land to be acquired, in accordance with the
Council’s Standing Orders on Contracts. 
[Reference: Minutes of 8 November 2023 (Paragraph 8) and Minutes of the Executive
Committee of 30 November 2022 (Paragraph 7)] 
In terms of Standing Order No 14, the Chair adjourned the meeting at 11.00am and reconvened at
11.05am 
15 Delegated Authority Report – Update
A report dated 17 October 2024 by the Executive Director (Housing and Technical Resources)
was submitted on transactions processed by Property Services during Quarter 2 of 2024/2025. 
The Executive Director (Housing and Technical Resources), under delegated powers, had
authority to deal with various transactions including:- 
 leases up to the value of £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
Details of the transactions undertaken during Quarter 2, as contained in Appendix 1 to the
report, were as follows:- 
Quarter 2 2024/2025:
Number of transactions 84
Total value of lease transactions £187,174 per annum
Total value of capital transactions £3,192,271
Total number of miscellaneous transactions 3 
In addition, at the Council meeting on 27 March 2024, temporary authority had been granted to
the Executive Director (Housing and Technical Resources), in conjunction with the Head of
Administration and Legal Services, to enter into short-term lease arrangements for the
properties affected by the budget setting decisions made by the Council and South Lanarkshire
Leisure and Culture on 21 February and 28 February 2024, respectively. 
This authority ran from 19 June to 18 September 2024 and 5 leases had been completed during
this period for the following properties:- 
♦ Carstairs Junction Hall
♦ Pettinain Hall
♦ Coulter Hall
♦ Crossford Hall
♦ Thankerton Hall 
The Committee decided: 
(1) that the transactions processed by delegated authority by Property Services during Quarter
2 of 2024/2025 be noted; and 
(2) that the short-term leases, as detailed in the report, be noted. 
[Reference: Minutes of 18 September 2024 (Paragraph 19) and Minutes of the South
Lanarkshire Council of 27 March 2024 (Paragraph 6)]
14

Page 15

16 Annual Report on the Charter (ARC) 2023/2024
A report dated 5 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted providing an update on:- 
 the Scottish Social Housing Charter and the requirement to produce an Annual Report on
the Charter (ARC) covering performance during 2023/2024
 arrangements to monitor and report on Charter progress throughout 2024/2025 
The Charter contained 32 measures of performance which reflected a mixture of qualitative,
survey-based information, as well as a range of efficiency and effectiveness measures.  To
comply with the requirements set out by the Scottish Housing Regulator (SHR), the Resource
submitted its 2023/2024 performance information to the Regulator on 23 May 2024. 
The Charter report was consistent with those of previous years and a summary, attached as
Appendix 1 to the report, provided further details on each indicator together with a comparison
against the Scottish average for all social landlords, and that of the other Scottish local authority
landlords.  There were 5 indicators where performance had improved in the last year, details of
which were included in the report, along with a summary of the position and context in relation to
3 indicators where performance had reduced. 
The Resource Plan 2024/2025, which included the majority of the Charter indicators, would
continue to be monitored and reported as part of the 6-monthly update to this Committee. 
The Committee decided: 
(1) that the Council’s reported performance and contextual information for the Scottish Social
Housing Charter and comparisons with other landlords, as detailed at Appendix 1 to the
report, be noted; and 
(2) that the future use of the Charter for ongoing scrutiny by the Scottish Housing Regulator
(SHR), tenants and other service users, be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 13)] 
17 Scottish Housing Regulator – Annual Return on the Scottish Social Charter – A
Consultation
A report dated 5 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted on the Council’s response to the consultation on the Annual Return on the
Scottish Social Charter which had been submitted to the Scottish Housing Regulator (SHR) in
advance of the set timescale of 8 November 2024. 
The report outlined the focus of the consultation and Council response, which was also detailed
in Appendix 1 to the report. 
The SHR had been established in 2011 as an independent body directly accountable to the
Scottish Government to regulate registered social landlords (RSLs) and local authority housing
and homelessness services.  The SHR did this by assessing and reporting on social landlords’
delivery of services, RSLs’ financial well-being and standards of governance and, where
necessary, the SHR would intervene to secure improvements. 
During 2023, the SHR consulted on the future of social housing regulation in Scotland and
published their revised framework in February 2024.
15

Page 16

During a consultation on the revised Regulatory Framework, the SHR noted proposals to
develop and introduce specific indicators on tenant and resident safety within the Annual Report
on the Charter (ARC).  It was also proposed to develop appropriate monitoring of the
effectiveness of landlords’ approach to managing reports and instances of damp and mould. 
Views were also sought on the continuing appropriateness of existing ARC indicators. 
After reviewing feedback, the SHR would aim to publish final versions of the Charter indicators
in a revised Technical Guidance and a list of FAQs by January 2025.  This would allow landlords
to start collecting the data from 1 April 2025. 
The Committee decided: that the Council’s response to the Scottish Housing
Regulator’s consultation on the Annual Return on the
Scottish Social Charter be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 13)] 
18 Notification of Contracts Awarded - 1 March to 30 September 2024
A report dated 22 October 2024 by the Executive Director (Housing and Technical Resources)
was submitted on contracts awarded by Housing and Technical Resources, valued in excess of
£50,000, in the period 1 March to 30 September 2024. 
In terms of Standing Order No 21.8 of the Council’s Standing Orders on Contracts, Resources
were required to notify the relevant committee of contracts awarded above the sum of £50,000. 
Details of the contracts awarded or extended were provided in the appendices to the report. 
The Committee decided: 
(1) that the details of the contracts awarded, as detailed in Appendix A to the report, be noted;
and 
(2) that details of the contracts extended, as detailed in Appendix B to the report, be noted. 
[Reference: Minutes of 24 April 2024 (Paragraph 17)] 
19 Update of the Housing and Technical Resources' Risk Register and Risk Control
Plan
A report dated 5 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted providing an update on the Housing and Technical Resources’ Risk Register and
Risk Control Actions. 
Housing and Technical Resources had followed Council guidance in developing, monitoring,
and updating its Risk Register on an ongoing basis.  The Register had been developed to
ensure that the Resource:- 
 was fully aware of the top risks 
 was able to prioritise those risks 
 had controls in place to eliminate or minimise the impact of the risk
16

Page 17

The risks were scored in accordance with the Council’s scoring mechanism based on likelihood
and impact of risk.  This resulted in risks being scored between 1 to 25 (low to very high).  Risks
were scored on their inherent risk (risk if nothing was done), and their residual risk (risk after
applying controls).   
The Risk Register for the Resource had been developed and was monitored on an ongoing
basis by the Resource Risk Management Group to add new risks and to review the score of
existing risks.  The main changes to the Risk Register, including 4 new risks, were summarised
in the report. 
Details of all risks which had scored very high and high were provided in Appendix 1 to the
report.  Risks evaluated as being medium or low risk would be monitored to ensure that they
continued to be adequately managed. 
Appendix 2 to the report provided a comparison of risk scores for 2023 and 2024.  This
appendix also detailed changes in risk descriptions. 
Officers responded to a member’s question in relation to encouraging the uptake of common
buildings insurance and undertook to look at this as part of the factoring review that was
currently taking place. 
The Committee decided: that the contents of the Resource Risk Register be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 14)] 
20 Annual Report - Mainstreaming Equality and Diversity within Housing and
Technical Resources 
A report dated 5 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted providing an overview of progress made in relation to mainstreaming equalities
within Housing and Technical Resources during 2023/2024 and highlighting the key actions
being progressed during 2024/2025. 
The Housing and Technical Resources’ Equality and Diversity Co-ordination Group continued to
progress the Equality and Diversity work plan and supported a consistent approach to
mainstreaming equality and diversity across the Resource. 
Details were provided on progress made in meeting those commitments during 2023/2024 and
the key priorities for 2024/2025 were outlined. 
The Committee decided: that the progress made during 2023/2024 and key actions
for 2024/2025 in relation to mainstreaming equalities be
noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 12) and Minutes of the Executive
Committee of 2 October 2024 (Paragraph 10) and 21 June 2023 (Paragraph 11)] 
21 Urgent Business 
There were no items of urgent business.
17

Page 18

22 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following items of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraph 9 of Part I of
Schedule 7A of the Act. 
23 Disposal of Land at Stewartfield Way, East Kilbride
A report dated 6 November 2024 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval for the disposal of land extending to 34.59 hectares, or
thereby, at Stewartfield Way, East Kilbride, currently held on a long lease. 
Information was provided on the proposal for the disposal of the land, subject to the principal
conditions detailed in the report. 
The Committee decided: 
(1) that the site at Stewartfield Way, East Kilbride, extending to 34.59 hectares, or thereby, be
disposed of and in terms of the principal conditions detailed in the report; and 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all other matters
pertaining to the disposal of the site and to enter into the necessary legal agreements on
terms which were in the best interests of the Council. 
18

Page 19

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of the special meeting held via Confero and in Committee Room 1, Council Offices, Almada
Street, Hamilton on 22 January 2025 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor
Janine Calikes, Councillor Gerry Convery, Councillor Andrea Cowan, Councillor Margaret Cowie
(Depute), Councillor Maureen Devlin, Councillor Colin Dewar, Councillor Allan Falconer, Councillor
Grant Ferguson, Councillor Alistair Fulton, Councillor Ross Gowland, Councillor Geri Gray,
Councillor Ross Lambie, Councillor Richard Lockhart, Councillor Julia Marrs, Councillor Ian
McAllan, Councillor Kenny McCreary, Councillor Norman Rae, Councillor David Shearer, Councillor
Kirsty Williams 
Councillors' Apologies:
Councillor Margaret Cooper, Councillor Joe Fagan (ex officio), Councillor Martin Lennon 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); K McLeod, Administration Assistant; S McLeod,
Administration Officer; D McMillan, Finance Adviser
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services 
Chair’s Opening Remarks
The Chair thanked tenant representatives on the Budget Scrutiny Group and the Tenant
Participation Co-ordination Group for the feedback they had provided and for their assistance in
ensuring that tenants’ views had been considered in relation to the development of the Housing
Revenue and Capital Account Budget for 2025/2026. 
1 Declaration of Interests
No interests were declared. 
2 Housing Revenue and Capital Account Budget 2025/2026
A joint report dated 24 December 2024 by the Executive Directors (Housing and Technical
Resources) and (Finance and Corporate Resources) was submitted on:- 
 the revenue estimate proposals for the Housing Revenue Account (HRA) for 2025/2026
which had been prepared in line with the 30-year Business Plan
 the 2025/2026 Housing Capital Programme totalling £85.948 million 
The HRA revenue budget for 2025/2026 had been prepared in line with the 30-year HRA
Business Plan, developed to reflect the investment priority to maintain and improve the housing
stock to meet national housing quality and energy efficiency standards.  The programme also
included projects to increase the supply of Council housing as well as environmental works and
legislative compliance programmes, to ensure that all safety requirement standards were met.
3
19

Page 20

The movement from the original 2024/2025 revenue budget was outlined in Appendix 1 to the
report. 
The 2025/2026 budget proposal also included a provision of £2.273 million for bad debt which
would be required to continue to provide for the potential impact on rent collection and arrears. 
This included contingency for the ongoing uncertainty on rental collections in the coming year
due to cost-of-living pressures, continued managed migration to Universal Credit and an
allocation of £0.300 million for tenancy sustainment mitigation. 
During previous budget engagement, tenants had favoured multi-year agreements on the basis
that they would have some clarity regarding rent levels in the medium term.  A rent increase of
6.50% was proposed from 2025/2026, with a further 6.50% increase in 2026/2027, as the
second year of a 3-year multi-year agreement.  In accordance with statutory requirements, this
would be subject to annual review and customer engagement.  This approach allowed the
Council and tenants to plan and budget on a longer-term basis. 
The proposed 2025/2026 HRA capital programme was detailed in Appendix 2 to the report. 
Information was provided on:- 
 the funding allocation in the Scottish Government draft budget for 2025/2026 for the
Affordable Housing Supply Programme, which would increase by 44%, with the Council
continuing to engage with the Scottish Government to clarify how this would translate
locally
 the budget consultation programme undertaken by the Council in conjunction with the
Budget Scrutiny Group and the Tenant Participation Co-ordination Group 
Officers responded to members’ questions in relation to:- 
 specific updates being provided to Committee in relation to bad debt and unpaid rents,
particularly looking at the demographic, patterns and impact of the cost-of-living crisis
 the impact of the rise in employer’s national insurance on:-
 supervision and management costs
 tenants’ rents for this and future years and whether redress had been sought from
the UK government
 reassurance that the Council had the in-house capability to cope with the reduced use of
external contractors
 whether there would be any flexibility in the budget for Council house adaptations
 housing acquisitions targets 
The Head of Housing Services undertook to provide a member with information in relation to
upgrading works in their ward. 
The Committee recommended to the Executive Committee: 
(1) that the proposed rent increase of 6.50% to be applied in 2025/2026, with a further 6.50%
increase in 2026/2027, subject to annual review and customer engagement, for all Council
houses, Gypsy/Traveller sites, lock-ups and garage sites and the revenue estimate
proposals for the HRA, as detailed in Appendix 1 to the report, be endorsed and referred to
the Council for approval; and 
(2) that, based on the proposed rent increase of 6.50%, the 2025/2026 Housing Capital
Programme of £85.948 million, as detailed in Appendix 2 to the report, be endorsed and
referred to the Council for approval. 
[Reference: Minutes of 27 November 2024 (Paragraph 10) and Minutes of the special meeting
of South Lanarkshire Council of 21 February 2024 (Paragraph 3)]
20

Page 21

3 Urgent Business 
There were no items of urgent business. 
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2024/2025 - Housing and
Technical Resources - Housing Revenue Account
(HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 27 December 2024 for Housing and Technical
Resources (HRA)
 provide a forecast for the year to 31 March 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the forecast breakeven position on Housing and Technical Resources’
(HRA) revenue budget, as detailed in Appendix A to the report, be noted; and
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the third revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2024/2025. 
3.2. This report reflects the actual spend to 27 December 2024 within the Resource
budget and reflects the expected outturn forecast on expenditure and income at this
date.     
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 27 December 2024, there was a forecast breakeven position against the
budget. This is outlined in Appendix A to the report. 
5.2. This breakeven position includes a lower than budgeted Transfer from Reserves,
reflecting a net reduction in expenditure for the year.  This is detailed in Appendix A
to the report. 
5.3. Appendix A to the report also notes the actual position, as at 27 December 2024,
being a net income position of £31.538 million.  This reflects the timing of income
and expenditure at that point in the year.  
4
23

Page 24

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4 weekly Budget Monitoring Meetings at
which any variance is analysed.  In addition, the move to routine forecasting and the
work within the Resource and Finance teams, ensures early warning for corrective
action to be taken where appropriate. 
7.2. Inflationary and budget pressures increase the risk of overspend, however, these
pressures are assessed and managed within the budget planning exercise for
current and future years. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
29 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 27 December 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kathleen Gowrie, Finance Manager
Ext:  2680 (Tel:  01698 452601)
E-mail :  Kathleen.Gowrie@southlanarkshire.gov.uk
24

Page 25

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 27 December 2024 (No.10) 
Housing Revenue Account 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 14,415 14,374 41 under 0.28% 10,572 
Property Costs 60,703 60,258 445 under 0.73% 38,904 1
Supplies & Services 1,543 1,553 (10) over (0.65%) 391 
Transport & Plant 195 127 68 under 34.87% 138 
Administration Costs 5,594 5,469 125 under 2.23% 325 2
Payments to Other Bodies 2,975 3,354 (379) over (12.74%) 2,086 3
Payments to Contractors 100 100 0 - 0.00% 335 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 33,573 33,571 2 under 0.01% 3 
Total Controllable Exp. 119,098 118,806 292 under 0.25% 52,754 
Total Controllable Inc. (123,397) (124,665) 1,268 over
recovered (1.03%) (84,292) 4
Transfer to/(from) Balance
Sheet (4,862) (3,141) (1,721) under
recovered 35.40% 0 5
Net Controllable Exp. (9,161) (9,000) (161) under 1.76% (31,538) 
Loan Charges 9,161 9,000 161 under 1.76% 0 6
Net Controllable Exp. / (Inc.) 0 0 0 - 0.00% (31,538) 
Variance Explanations 
1.  The underspend in property costs is due to the net effect of lower than forecast bad debt write offs and forecast expenditure on          
grounds maintenance charges partially offset by greater than forecast repairs and maintenance expenditure, electricity charges and
fixtures and fittings due to increased demand.
2.  The underspend is mainly due to lower than forecast expenditure on postage, printing and stationery and mobile phone costs.
3. The overspend in Payments to Other Bodies reflects additional support payments for current IT systems.
4.  The over recovery in income is due to greater than budgeted income from rent collection offset in part by lower-than-expected income
from laundry charges and reflects the severe weather insurance settlement being less than expected arising from ineligible
expenditure.
5.  The transfer to reserves is anticipated to be lower than budget due to the overall projected position.
6.  The underspend is due to forecast loan charges being lower than budget along with interest on revenue balances being greater than
anticipated. 
Virements 
There are no virements to report. 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2024/2025 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2024 to 27 December 2024 for Housing and
Technical Resources (excl HRA)
 provide a forecast for the year to 31 March 2025
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the forecast to 31 March 2025 of a breakeven position after approved
transfer to reserves as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the third revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2024/2025. 
3.2. The report details the financial position for Housing and Technical Resources
(excluding HRA).  Appendix A  to the report provides the service analysis statement,
outlining key highlights by Service for the Resource and Appendices B to D to the
report provide the detailed financial position with variance explanations by budget
category. 
3.3. This report reflects the actual spend to 27 December 2024 within the Resource
budget and reflects the expected outturn forecast on expenditure and income at this
date.  The output from the formal Probable Outturn exercise is noted in Section 5.2.   
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 27 December 2024, the Resource’s projected outturn position for 2024/2025 is
an underspend of £0.705 million, before transfers to reserves.  This is outlined in
Appendix A to the report. 
5
27

Page 28

5.2. Probable Outturn  
Following the Council’s formal Probable Outturn exercise, the forecast for the budget
to 31 March 2025 is a breakeven position after transfers to reserves of £0.705m
approved at the Executive Committee (12 February 2025).  This position is outline in
Appendices B to D. 
5.3. Virements are proposed to realign budgets. These movements have been detailed in
the appendices to this report, as appropriate. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
29 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 27 December 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kathleen Gowrie, Finance Manager
Ext:  2680 (Tel:  01698 452601)
E-mail :  kathleen.gowrie@southlanarkshire.gov.uk
28

Page 29

Appendix A 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period 10 Ended 27 December 2024 (No. 10) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Housing Services 9,182 8,644 538 5.86% 9,499
Property Services 5,909 5,742 167 2.83% 13,105
Net Controllable Exp. 15,091 14,386 705 8.69% 22,604 
Service Heading Explanation for significant projected outturn variances
Housing Services
The service is anticipated to underspend at the year-end mainly due to reduced payments to external
providers for sheltered housing. 
Expenditure on temporary accommodation within the Homelessness service is forecast to overspend
however this is offset by an underspend on commissioned services and anticipated increased rental
income. 
Transfers to reserves of £0.455m have been approved by the Executive Committee (12 February
2025): £0.237m for Homelessness Temporary Accommodation and £0.218m for the Ukraine
Resettlement Funding. 
Property Services
The service is anticipated to underspend at the year-end mainly due to lower than forecast rates and
utility charges within Office Accommodation and employee costs within CCTV and Estates.  These
underspends are offset in part by overspends in repairs and maintenance within Property
Maintenance. 
There is also a forecast underspend on employee costs within Building Services and an over recovery
in income which are anticipated to offset an overspend in payment to contractors. 
There is a proposed transfer to reserves of £0.250m at the end of the financial year relating to an
underspend in Office Accommodation budgets. 
29

Page 30

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 27 December 2024 (No.10) 
Housing and Technical Resources Summary (excl HRA) 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 46,818 45,078 1,740 Under 3.72% 32,002 
Property Costs 20,615 21,787 (1,172) Over (5.69%) 22,836 
Supplies & Services 13,522 11,713 1,809 Under 13.38% 3,999 
Transport & Plant 4,677 4,219 458 Under 9.79% 3,569 
Administration Costs 3,724 3,743 (19) Over (0.51%) 719 
Payments to Other Bodies 6,979 7,050 (71) Over (1.02%) 3,626 
Payments to Contractors 12,376 17,350 (4,974) Over (40.19%) 12,427 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 156 137 19 Under 12.18% 17 
Total Controllable Exp. 108,867 111,077 (2,210) Over (2.03%) 79,195 
Total Controllable Inc. (93,776) (96,691) 2,915 Over
Recovered (3.11%) (56,592) 
Net Controllable Exp. 15,091 14,386 705 - 4.67% 22,603 
Transfer to Reserves 0 705 (705)    
Position after Transfer to
Reserves 15,091 15,091 0 - 0.00%     
Variance Explanations 
Variances are shown in Appendices C and D. 
Budget Virements 
Virements are shown in Appendices C and D. 
Approved Transfers to Reserves 
Transfer to Reserves are shown in Appendices C and D. 
30

Page 31

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 27 December 2024 (No.10) 
Housing Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 4,140 4,092 48 Under 1.16% 2,458 a
Property Costs 7,579 8,220 (641) Over (8.46%) 9,884 1, b
Supplies & Services 204 183 21 Under 10.29% 53 
Transport & Plant 147 118 29 Under 19.73% 72 
Administration Costs 146 147 (1) Over (0.68%) 71 
Payments to Other Bodies 4,326 4,228 98 Under 2.27% 2,449 2
Payments to Contractors 2,295 2,172 123 Under 5.36% 822 3
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 12 13 (1) Over (8.33%) 1 
Total Controllable Exp. 18,849 19,173 (324) Over (1.72%) 15,810 
Total Controllable Inc. (9,667) (10,529) 862 Over
Recovered (8.92%) (6,311) 4
Net Controllable Exp. 9,182 8,644 538 Under 5.86% 9,499 
Transfer to Reserves 0 455 (455)  0.00%  
Position after Transfer to
Reserves 9,182 9,099 83 Under 0.90%   
Variance Explanations 
1. The forecast overspend relates to commissioned services in the homelessness budget where expenditure varies according to service requirements,
offset by the over recovery of income (see 4. below).
2. The forecast underspend is mainly due to lower than budgeted payments to Registered Social Landlords for Housing Support Services. 
3. The underspend relates to commissioned services in the homelessness budget where expenditure varies according to service requirements.
4. The forecast over recovery of income mainly offsets the additional costs in relation to the homelessness service (see 1. above). 
Budget Virements 
a. Transfer of budget in relation to pay award. Net effect £0.112m: Employees £0.112m.
b. Redetermination of General Revenue Grant in respect of Temporary Accommodation and Ukraine Resettlement Funding. Net effect £0.303m: Property
Costs £0.303m. 
Approved Transfers to Reserves (£0.455m): 
i. Homelessness Temporary Accommodation (£0.237m).  There is an underspend in the current year forecast, and it is proposed to transfer this to
reserves to fund future investment in the Homelessness service to meet future demands.
ii. Ukraine Resettlement Funding (£0.218m).  This funding forms part of the 2024/2025 revenue grant redeterminations and will be carried forward for
use in 2025/2026. 
31

Page 32

Appendix D 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 27 December 2024 (No.10)  
Property Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 42,678 40,986 1,692 Under 3.96% 29,544 1, a, b,
Property Costs 13,036 13,567 (531) Over (4.07%) 12,953 2, a, c
Supplies & Services 13,318 11,530 1,788 Under 13.43% 3,946 3 
Transport & Plant 4,530 4,101 429 Under 9.47% 3,497 4
Administration Costs 3,578 3,596 (18) Over (0.50%) 648 
Payments to Other Bodies 2,653 2,822 (169) Over (6.37%) 1,177 5 
Payments to Contractors 10,081 15,178 (5,097) Over (50.56%) 11,605 6
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 144 124 20 Under 13.89% 16 
Total Controllable Exp. 90,018 91,904 (1,886) Over (2.10%) 63,386 
Total Controllable Inc. (84,109) (86,162) 2,053 Over
Recovered (2.44%) (50,281) 7, a
Net Controllable Exp. 5,909 5,742 167 Under 2.83% 13,105 
Transfer to Reserves 0 250 (250)    
Position after Transfer to
Reserves 5,909 5,992 (83) Over (1.40%)   
Variance Explanations 
1. The forecast underspend relates to turnover and vacancies Building Services and Estates which are actively being recruited as required.
2. The forecast overspend relates to service charges within Estates and costs associated with planned and reactive maintenance of Council properties.
3. The forecast underspend mainly relates to lower than anticipated expenditure on materials within Building Services due to the timing of capital and
revenue works.  It also includes an underspend on minor adaptations (refer 5 below).
4. The level of expenditure on scaffolding, plant and other transportation costs varies depending on the current workload demands and timing of works on a
wide variety of capital and revenue works within Building Services.
5. The forecast overspend is in relation to grants for Homeowners via the Private Sector Scheme of Assistance and is offset by an underspend in Supplies
and Services for minor adaptations (refer 3 above).
6. The forecast overspend reflects current workload demands and timing of works by Building Services, on a wide variety of capital and revenue works.  
7. The forecast over recovery of income is due to the recharge of the net additional spend incurred by Building Services, reflecting the level and type of
revenue and capital works undertaken this financial year. 
Budget Virements 
a. Transfer of budget in relation to pay award. Net effect £0.347m: Employees £1.532m, Property Costs £0.209m, Income (£1.394m)
b. Removal of budget in respect of Overtime savings 2024/2025. Net effect (£0.100m): Employees (£0.100m).
e. Transfer of budget in relation to Net Zero Innovation Fund (2024/2025 Investment monies).  Net effect £0.075m.  Property Costs £0.075m 
Approved Transfers to Reserves (£0.250): 
i. Office Accommodation (£0.250m).  Underspend from property rationalisation to be used to support future property requirements.
32

Page 33

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025 
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2024/2025 - Housing and
Technical Resources (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April to 27 December 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources HRA capital programme of
£77.248 million, and forecast expenditure of £73.112 million, be noted. 
3. Background
3.1. This is the third capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2024/2025.   
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 13 November 2024.   
3.3. The report details the financial position for Housing and Technical Resources (HRA)
in Appendix A to the report. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2024/2025 totals £77.248 million and is detailed
along with the funding sources at Appendix A to the report.  This budget is based on
the original programme approved by the Council in February 2024, budget carried
forward from financial year 2023/2024 and the Scottish Government Affordable
Housing Grant available for 2024/2025. 
5.2. The current forecast for 2024/2025 from Housing and Technical Resources has
identified an outturn of £73.112 million for the year, an underspend of £4.136 million. 
As reported previously, this is a result of delays in site starts at Cairnswell Avenue,
Cambuslang and Brackenhill Farm, Hamilton.  In addition, the average purchase
price for properties purchased through the Market Purchase Scheme has reduced
reflecting the current size of properties.   
6
33

Page 34

5.3. Any Council funding not utilised in year (borrowing) will carry forward into the next
financial year. 
5.4. The spend to 30 December 2024 on the Housing Capital Programme amounts to
£43.425 million.   
5.5. As at 30 December 2024, £43.425 million of funding had been received.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
29 January 2025 
Link(s) to Council Values/Priorities/Outcomes
♦ Accountable, Effective, Efficient and Transparent 
Previous References
♦ Executive Committee, 13 November 2024 
List of Background Papers
♦ Financial ledger to 27 December 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kathleen Gowrie, Finance Manager (Resources)
Ext:  2601 (Tel:  01698 452601)
E-mail:  Kathleen.Gowrie@southlanarkshire.gov.uk  
34

Page 35

South Lanarkshire Council       Appendix A
Housing Capital Programme 2024/2025
As at 27 December 2024 
2024/25
Annual 
Budget  
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25 
Actual to
27/12/24 
£m £m £m £m
Expenditure 
2024/25 Budget  77.248  73.112  4.136  43.425     
2024/25
Annual 
Budget  
2024/25
Actual to
27/12/24 
£m   £m
Income         
Capital Receipts 0.000   0.265
Capital Funded from Current Revenue 33.506   32.330
Prudential Borrowing 23.363   0.000
Scottish Government Specific Grant:    
- New Build 17.259   10.206
- Open Market Purchase Scheme 3.000   0.000
- Mortgage to Rent 0.120   0.353
Other Income 0.000   0.271 
77.248   43.425 
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2024/2025 - Housing and
Technical Resources (excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl. HRA) for the period 1 April to 30 December 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources capital programme of £9.984
million, and forecast expenditure of £8.120 million, be noted.
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2024/2025.  Further reports will follow
throughout the year. 
3.2. The revised budget of £9.984 million for Housing and Technical Resources is based
on the overall Capital Programme for 2024/2025 (June 2024) and includes updates
approved by the Executive Committee on 11 December 2024 (a decrease of £0.645
million). 
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A to the report. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2024/2025 Budget   
As detailed in Section 3.2 in the report, the revised capital programme for Housing
and Technical Resources is £9.984 million and includes budget amendments,
totalling a net decrease of £0.645 million, which have been approved by the
Executive Committee on 11 December 2024.  The details of these amendments are
shown in Appendix A to the report. 
7
37

Page 38

5.2. 2024/2025 Forecast 
Appendix A to the report shows a forecast for the financial year of £8.120 million.
This forecast underspend reflects the timing of spend across this year and into the
new financial year, and results in budget required in 2025/2026, rather than
2024/2025.  Funding for projects remaining underspent at the financial year end will
be carried forward, to allow the projects to be completed in 2025/2026.  As at 30
December 2024, work continues to clarify the predicted spend position for the
General Services Capital Programme for the remainder of this financial year. 
Officers will continue to work to maximise spend in 2024/2025.   
5.3. For information, actual expenditure to 30 December 2024 is £5.012 million. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
28 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 11 December 2024 
List of Background Papers
▪ Financial ledger to 30 December 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
38

Page 39

Appendix A 
South Lanarkshire Council
Capital Expenditure 2024-25
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2024 – 30 December 2024 
Housing and Technical
Resources (excl. HRA)
Base
Budget 
£000
Budget
Adjustment
s
£000
Slippage/
Acceleration
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000
Asset Management Programme 8,675 - -  8,675  7,261  1,414  4,601
Private Housing Scheme of
Assistance 1,000  (1,000) -  -  -  -  -
Other Housing 1,254 700 (645)  1,309  859  450  411
TOTAL 10,929 (300) (645)  9,984  8,120  1,864  5,012 
For Information Only  
Budget Adjustments presented for approval by Executive Committee, 11 December 2024: 
Budget Adjustments 
Alarms (Analogue to Digital) Fire Alarm System Upgrade
CEEF - 2024/2025 programme 
Total Budget Adjustments             
(£0.607m)
(£0.038m) 
(£0.645m) 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – October to December 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for October to December 2024 relating to
Housing and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for October to December 2024
relating to Housing and Technical Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for October to December
2024. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of December 2024 for
Housing and Technical Resources. 
The Resource absence figure for December 2024 was 6.2%, this figure has
decreased by 0.3%, when compared to the previous month and is 0.8% lower than
the Council-wide figure.  Compared to December 2023, the Resource absence figure
has increased by 0.2%. 
Based on the absence figures at December 2024 and annual trends, the projected
annual average absence for the Resource for 2024/2025 is 6.4% compared to a
Council-wide average figure of 5.8%.
8
41

Page 42

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 146 referrals were made this period. 
This represents a decrease of 24 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 4 accidents/incidents recorded within the Resource this period.   
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 20 disciplinary hearings were held within the Resource, an
increase of 19 when compared to the same period last year.  No appeals were heard
by the Appeals Panel, this figure has remained unchanged when compared to the
same period last year and 1 appeals panel is pending.  One grievance was raised
within the Resource, this figure also remains unchanged when compared to the
same period last year.  One Dignity at Work complaint was raised within the
Resource, this figure has increased by 1 when compared to the same period last
year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were 19 leavers in the Resource this period eligible for an exit interview.  This
figure has decreased by 2, when compared with the same period last year.  Five exit
interviews were conducted in this period, this figure has decreased by 2 when
compared to the same period last year.   
5. Employee Implications
5.1. There are no implications for employees arising from the information presented in
this report. 
6. Financial Implications
6.1. All financial implications are accommodated within existing budgets. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
8. Other Implications
8.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report.
42

Page 43

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
31 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Housing and Technical Resources, 27 November 2024 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Eileen McPake HR Business Manager
Ext:  (Tel: 01698 454668)
E-mail:    eileen.mcpake@southlanarkshire.gov.uk
43

Page 44

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.7 5.3 April 10.6 6.9 7.2 April 7.6 6.2 6.1 April 5.6 5.1 5.2
May 4.5 4.9 5.2 May 8.1 6.1 8.1 May 6.0 5.4 6.4 May 5.4 5.1 5.3
June 4.9 5.4 5.7 June 8.5 6.8 8.4 June 6.4 6.0 6.8 June 5.3 4.7 5.2
July 5.5 5.0 5.3 July 8.9 8.1 8.6 July 6.9 6.2 6.7 July 4.6 3.8 4.1
August 4.7 5.1 5.5 August 7.1 8.5 8.8 August 5.7 6.4 6.9 August 4.4 4.1 4.7
September 4.5 4.7 7.5 September 6.3 7.8 7.4 September 5.2 6.0 7.5 September 5.4 5.3 6.1
October 4.3 4.9 7.3 October 7.8 5.2 6.0 October 5.8 5.0 6.8 October 5.8 5.1 6.0
November 4.6 4.8 6.8 November 7.8 6.7 6.2 November 5.9 5.6 6.5 November 6.5 6.2 6.9
December 4.4 5.1 6.4 December 7.2 7.4 5.8 December 5.6 6.0 6.2 December 7.0 6.6 7.0
January 4.5 4.4 January 5.5 6.0 January 4.9 5.0 January 5.8 6.1
February 4.4 5.2 February 6.2 6.3 February 5.1 5.6 February 5.9 6.4
March 5.3 5.3 March 6.8 7.2 March 5.9 6.1 March 6.4 6.3
Annual Average 4.8 5.0 5.8 Annual Average 7.6 6.9 7.2 Annual Average 5.9 5.8 6.4 Annual Average 5.7 5.4 5.8
Average Apr-Dec 4.8 5.1 6.1 Average Apr-Dec 8.0 7.1 7.4 Average Apr-Dec 6.1 5.9 6.7 Average Apr-Dec 5.6 5.1 5.6
860 546 1406 15698No of Employees at 31 December 2024No of Employees at 31 December 2024 No of Employees at 31 December 2024 No of Employees at 31 December 2024
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
APT&C Manual Workers Council Wide
44

Page 45

Oct - Dec Oct - Dec
2023 2024
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 34 24
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 2 0
TOTAL 170 146
Oct - Dec Oct - Dec
2023 2024
Specified Injuries* 0 0
Over 7 day absences 1 1
Over 3 day absences** 1 0
Minor 7 0
Near Miss *** 0 1
Violent Incident:  Physical**** 0 0
Violent Incident:  Verbal***** 1 2
Total Accidents/Incidents 10 4
Oct - Dec Oct - Dec
2023 2024
Total Number of Hearings 1 20
Total Number of Appeals 0 0
Appeals Pending 0 1
Time Taken to Convene Hearing October - Oct to Dec 2024
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 2 18
Oct - Dec Oct - Dec
2023 2024
Number of Grievances 1 1
Still in Progress 1 1
Oct - Dec Oct - Dec
2023 2024
Number of Incidents 0 1
Still in Process 0 1
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
HOUSING AND TECHNICAL RESOURCES
52 58
21 10
61 54
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
RECORD OF DIGNITY AT WORK
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
45

Page 46

Oct - Dec Oct - Dec
2023 2024
Career Advancement 1 2
Child Caring / Caring Responsibilities 0 0
Disatisfaction with terms and conditions 0 0
Further Education 0 0
Moving outwith area 0 0
Personal Reasons 1 1
Poor relationship with managers / colleagues 1 0
Travelling difficulties 0 0
Other 0 2
Number of Exit Interviews conducted 3 5
Total Number of Leavers Eligible for Exit Interview 21 19
Percentage of interviews conducted 14% 26%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
HOUSING AND TECHNICAL RESOURCES
46

Page 47

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Housing Allocation Policy – Local Letting Plans
2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise on progress against the 2024/2025 letting targets
 request approval for the 2025/2026 letting targets
 request approval for the 2025/2026 local letting initiatives
?1ur[1purpos
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that progress against the 2024/2025 letting targets be noted;
(2) that the 2025/2026 mainstream housing letting targets, attached as  Appendix
1 to the report, be approved;
(3) that the 2025/2026 sheltered housing letting targets, attached as Appendix 2
the report, be approved; and
(4) that the Local Letting Initiatives, attached as Appendix 3 to the report, be
approved.
[[1recs]
3. Background
3.1. Local Letting Plans (LLPs) have been a key feature of the Housing Allocation Policy
since 2009.  During the review of the Housing Allocation Policy in 2018/2019, it was
recognised that LLPs continue to provide an effective means for ensuring that a
strategic and flexible approach is taken in the allocation of Council housing in South
Lanarkshire.  Consequently, LLPs were retained within the revised Housing
Allocation Policy, which came into effect in May 2019. 
3.2.  On an annual basis, LLPs are prepared for each of the housing management areas
of South Lanarkshire.  LLPs provide an overview of local supply and demand and set
out:- 
 annual letting targets for each of the 4 housing lists (in relation to mainstream
and sheltered properties)
 details of Local Letting Initiatives (LLIs) in operation within a local area 
3.3. The targets and initiatives detailed within LLPs are subject to Housing and Technical
Resources Committee approval.  This is the sixth annual report on LLPs since the
revised Housing Allocation Policy was introduced.  
9
47

Page 48

4. Homelessness Strategic Plan
4.1. In recent years, both across Scotland and locally, levels of homelessness have
increased substantially, placing significant pressures on homelessness services. 
The South Lanarkshire Homelessness Strategic Plan sets out a number of actions
to prevent homelessness as far as possible and otherwise minimise the impact,
through the provision of good quality temporary accommodation, support as
required and striving to end homelessness as quickly as possible.  Identifying
letting targets contributes towards achieving the priority objectives set out within
the plan. 
5. Achievement of the 2024/2025 Letting Targets 
5.1. The information provided in relation to the achievement of letting targets has been
projected to the end of the financial year, based on data collated between 1 April and
8 December 2024.  This approach allows letting targets and letting initiatives to be
fully implemented from the start of the financial year. 
5.2. Across each housing management area, letting targets are set within bands for each
housing list to allow for a degree of flexibility when allocating properties.  Full details
of the projected outcomes in relation to the targets set for both mainstream and
sheltered properties in 2024/2025 are set out in Appendices 1 and 2 to the report. 
5.3. In relation to mainstream Council properties, it is projected that across South
Lanarkshire, performance against the Urgent Housing Need list will exceed the
banded target.  This can be attributed to the significant on-going demand for housing
from homeless households in South Lanarkshire.  Consequently, lets directed to the
Transfer and Waiting lists are projected to be below the target, while lets to the Other
Categories list are projected to be within the target band.  A key focus for local
housing teams is to increase lets to transfer applicants to help achieve the year-end
target, which will in turn increase turnover. 
5.4. In relation to the targets set for sheltered properties across South Lanarkshire, it is
projected that lets to all housing lists will be within target.   
6. Letting Targets for Mainstream Properties during 2025/2026
6.1. The letting targets proposed for mainstream properties across South Lanarkshire
and for each of the 4 housing management divisions are set out in Appendix 1 to the
report. 
6.2.  The factors which have been taken into account when setting the mainstream letting 
targets for 2025/2026 are detailed below:- 
♦ demand for social rented housing remains high – 12,939 applicants were on the
HomeFinder housing register as at 8 December 2024
♦ a continuing high demand from homeless households – between 1 April and 8
December 2024, 1727 homelessness applications were received.  Assuming
this trend continues, it is projected that 2494 homelessness applications will
have been received by the end of the financial year.  Whilst this represents a
decrease of 8.5% on the 2023/2024 year, numbers remain high
♦ the Council’s statutory duty to homeless households – the number of applicants
assessed as homeless and to whom the Council has a duty to provide settled
accommodation remains high.  As at 8 December 2024, there were 1,554
homeless applicants on the HomeFinder housing register, this is comparable
with the 2023/2024 year end position
48

Page 49

♦ the number of properties becoming available for let – it is projected that by the
end of the financial year, 1,868 mainstream properties will have been let, this
represents a slight increase of 2% (39) on the previous year  
♦ additional supply of housing – the number of Council new build properties and
acquisitions planned for completion during 2025/2026
 support to individuals and families as part of refugee resettlement programmes
 joint working with partners – the contribution that HomeFinder partners and
other Registered Social Landlords (RSLs) make to meeting housing need,
including the needs of homeless applicants and other priority groups, through
agreed targets 
7. Sheltered Housing Letting Targets for 2025/2026
7.1.  Between 1 April and 8 December 2024, 100 sheltered properties became available
for let.  It is projected that by the end of the financial year, 144 sheltered properties
will have been let, broadly comparable to the number let in 2023/2024. 
7.2. There continues to be a high level of demand for sheltered housing, with 1,032
applicants on the HomeFinder housing register as at 8 December 2024.   
7.3. It is recognised that demand for sheltered housing varies across areas and individual
sheltered housing developments and this has been taken into account in the letting
targets proposed for 2025/2026. 
7.4. The letting targets proposed for sheltered properties across South Lanarkshire and
for each of the 4 housing management areas are set out in Appendix 2 to the report. 
8.  Local Letting Initiatives (LLIs)
8.1.  The Housing Allocation Policy allows for the establishment of LLIs in areas where
there are particular needs, issues or circumstances which require to be addressed. 
8.2.  During 2024/2025, there were 6 LLIs in operation across South Lanarkshire.  To
inform the development of the LLPs for 2025/2026, each of the letting initiatives have
been subject to review, to assess their impact and identify whether there is a need
for the initiative to continue. 
8.3. Based on the findings from the review, and to help contribute to meeting the needs of
homeless households in the area, it is proposed that the LLI to restrict lets to
homeless applicants in Greenhill Court, Rutherglen be removed.  Ensuring tenancy
sustainment in Greenhill Court will remain a priority and future lets will be closely
monitored to ensure stability within the community.   
8.4. It is proposed that the remaining 5 LLIs be retained during 2025/2026 and a new LLI
be introduced across South Lanarkshire, for the allocation of general needs flats
situated in blocks where ground and first floor properties are designated and utilised
as amenity flats.  The new initiative will promote tenancy sustainment and consider
the individual needs and circumstances of prospective tenants.  Details of all LLIs
are set out in Appendix 3 to the report. 
8.5.  In addition to the operation of LLI’s, local offices continue to support Council tenants
currently living in larger homes to downsize where they wish to do so.  As of 8
December 2024, 39 tenants were rehoused to smaller more suitable properties.  In
addition, through the right to mutual exhange, a further 18 tenants have downsized. 
It is proposed that this approach will continue in the year ahead. 
49

Page 50

9. Next Steps
9.1.  Implement 2025/2026 letting targets effective from Monday 7 April 2025. 
9.2.  Publish the 2025/2026 Local Letting Plans on the South Lanarkshire Council
website.  Housing Allocation Policy Local Letting Plans 2025-2026 
9.3.  Continue to monitor the impact of the LLIs throughout the year. 
10. Employee Implications
10.1.  There are no employee implications contained within this report. 
11. Financial Implications
11.1. There are no financial implications contained within this report. 
12. Climate Change, Sustainability and Environmental Implications
12.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
13. Other Implications
13.1.   The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
14. Integrated Impact Assessment and Consultation Requirements
14.1.  An integrated impact assessment has been carried out on the Local Letting Plan
(LLP) proposals outlined within this report.  The assessment identified that in general
the LLP targets and initiatives will have a neutral or postive impact on protected
characteristics groups and socio economic groups.  The assessment confirmed that
the targets will contribute positively to the Armed Forces Community and to both
Human and Children’s Rights through the effective allocation of housing to those
assessed as being in housing need. 
14.2. Consultation on the proposed letting targets and the LLIs has taken place with
tenants representatives from of the Tenant Participation Co-ordination Group.   
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 We will work to put people first and reduce inequality
 Focused on people and their needs
 Caring, connected, sustainble communities 
 Accountable, effective, efficient and transparent 
Previous Reference
 Housing and Technical Resources Committee report – Local Letting Plans, 7 February
2024 
List of Background Papers
 Local Letting Plans 2024/2025
50

Page 51

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Sharon Egan, Head of Housing Services
Ext: 4595 (Tel: 01698 454595)
E-mail: sharon.egan@southlanarkshire.gov.uk
51

Page 52

Appendix 1 
South Lanarkshire Council (SLC) Proposed Letting Targets for Mainstream
Properties 2025/2026 
South Lanarkshire
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 55-65% 1340 72 55-65%
Transfer 15-25% 259 14 15-25%
Waiting 15-20% 181 9 15-20%
Other Categories 0-5% 88 5 0-5%  
1868 100 
Cambuslang/Rutherglen Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 55-65% 259 73 55-65%
Transfer 15-25% 42 12 15-25%
Waiting 15-20% 22 6 15-20%
Other Categories 0-5% 32 9 0-5%  
355 100 
Clydesdale Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 45-55% 257 63 45-55%
Transfer 20-25% 64 16 20-25%
Waiting 20-30% 74 18 20-30%
Other Categories 0-5% 12 3 0-5%  
407 100 
East Kilbride Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 60-65% 376 75 60-65%
Transfer 20-30% 74 15 15-25%
Waiting 5-15% 27 5 10-20%
Other Categories 0-5% 27 5 0-5%  
504 100 
Hamilton Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 60-65% 448 75 60-65%
Transfer 15-25% 79 13 15-25%
Waiting 10-20% 58 9 10-20%
Other Categories 0-5% 17 3 0-5%  
602 100 
52

Page 53

Appendix 2
SLC Proposed Letting Targets for Sheltered Properties 2025/2026   
South Lanarkshire
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 15-30% 36 25 15-30%
Transfer 40-50% 58 40 40-50%
Waiting 25-35% 49 34 25-35%
Other Categories 0-5% 1 1 0-5%  
144 100 
Cambuslang Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 15-20% 6 27 15-20%
Transfer 35-45% 12 55 35-45%
Waiting 35-45% 4 18 35-45%
Other Categories 0-5% 0 0 0-5%  
22 100 
Clydesdale Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 15-20% 3 10 15-20%
Transfer 35-45% 13 45 35-45%
Waiting 35-45% 13 45 35-45%
Other Categories 0-5% 0 0 0-5%  
29 100 
East Kilbride Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 20-30% 13 30 20-25%
Transfer 30-45% 17 40 45-55%
Waiting 30-40% 13 30 20-30%
Other Categories 0-5% 0 0 0-5%  
43 100 
Hamilton Division
Housing Need List 2024/2025 2024/2025 Projected
Lets
2025/2026
Target Number % Target
Urgent Housing Need 15-25% 14 28 20-30%
Transfer 50-55% 16 32 35-40%
Waiting 20-30% 19 38 30-40%
Other Categories 0-5% 1 2 0-5%  
50 100 
53

Page 54

Appendix 3  
Proposed Local Letting Initiatives for 2025/2026 
Management
Area
Details of LLI Area covered by
LLI
Property
types/sizes
Duration
of LLI
Clydesdale  Priority for housing will be
given to applicants who have
a social or economic
connection with the area.  To
encourage tenancy
sustainment, discussions will
take place with prospective
tenants to ensure that they
fully understand the context to
living in a rural location. 
Forth East
Douglas
Douglas Water
Glespin
Rigside
All property
types/sizes
1 year     
Hamilton Reasonable priority for
housing to be given to
applicants with an assessed
mobility need. 
Almada Tower
Wyler Tower
1 and 2
bedroom multi
storey flats
1 year 
Cambuslang Reasonable priority for
housing to be given to
applicants with an assessed
mobility need.
Rosebank Tower
Sherry Heights
Standford Hall
Logan Tower
Springhall Court 
2 bedroom
multi storey
flats
1 year 
Cambuslang Priority for housing to be
given to Transfer list and
Waiting list applicants who
have a local connection. 
Cathkin Braes
Tenant
Management
Co-operative
area 
All property
sizes and
types
1 year 
Cambuslang  Priority for housing to be
given to Transfer list and
Waiting list applicants who
have a local connection. 
Whitlawburn  All property
types and
sizes
1 year 
All areas Priority will be given to
applicants who meet the
criteria for amenity housing,
taking into account their
individuals needs and
circumstances
South
Lanarkshire
General
needs flatted
properties
situated in
blocks where
ground and
first floor
properties are
designated
and utilised as
amenity flats
1 year
54

Page 55

Report
Agenda Item 
Report to: Housing and Technical Resource Committee 
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Homeless Pressures Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update committee on the continuing pressure on homelessness services 
 update committee on the impact of approved mitigations
 seek approval for the continuation of the Homeless Strategic Action Plan for
one further year to 2025/2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations:- 
(1) that the scale and nature of continued high demand for homelessness
assistance both nationally and locally, be noted;
(2) that the impact of mitigating actions set out in the Homeless Strategic Action
Plan 2024/25, be noted; and
(3) that the continuation of the Homelessness Strategic Action Plan for one further
year to 2025/2026, be approved. 
3. Background
3.1.  Over the past year regular updates have been provided to Housing and Technical
Resources Committee outlining the severe pressure placed on homelessness
services due to sustained high levels of demand. 
3.2. This position led to a range of mitigations being incorporated within the Homelessness
Strategic Action Plan 2024/2025, approved by Committee on 16 September 2024. 
3.3. Reports to Committee have highlighted that the extremely challenging circumstances
experienced locally are being mirrored across Scotland. 
3.4. Also previously noted in reports to Committee, national 5-year Rapid Re-housing
Transition Plans (RRTP) concluded in March 2024.  There is currently no further ask
of local authorities or direction from the Scottish Government in relation to continuation
of RRTPs or any alternative model. 
3.5. However, confirmation was received on 19 December 2024 of 1 further years RRTP
funding totalling £8 million across local authorities, which is on a par with previous
years funding.  Detail of the Council’s share of this funding is yet to be confirmed. 
3.6. National focus remains on response to the housing emergency, with Council officials
actively engaged in regular local meetings with the Scottish Government and
participating in national working groups. 
10
55

Page 56

3.7. The Council’s Homelessness Strategic Action Plan continues to focus on housing
emergency mitigating actions and long-standing strategic objectives, founded on
maintaining a person-centred approach to:- 
♦ address the significant increase in the number of households in temporary
accommodation
♦ maintain a sufficient supply of appropriate temporary accommodation
♦ improve the timescales to resolve homelessness
♦ reduce the number of children who are currently experiencing homelessness 
3.8. The last update to Committee on 16 September 2024 noted early indications of a
positive impact which the mitigating actions were having on key performance
outcomes.  It was, however, recognised this position followed 2 years of sustained
increased demand and that consideration of the trends would be required over a
longer time period to better understand the impact. 
3.9. Progress continues to be made in further developing the Council’s temporary
accommodation provision.  This includes the development of supported
accommodation in partnership with Social Bite and a Third Sector Partner which will
launch in the summer of 2025 and additional first stop accommodation with
timescales to be confirmed. 
4. Performance Monitoring
4.1.     Table 1 below sets out performance in relation to key indicators identified to gauge
the impact of mitigations, implemented since April 2024, by comparing the position at
Quarter 3 this year (up to 8 December 2024) with the same period the previous two
years. 
Table 1-  Comparison of Key Homelessness Measures 2022/2023 to 2024/2025
Homelessness Measures
South
Lanarkshire
Council
(SLC)
% Change
Quarter 3
YTD  2024/25 -
2023/24
SLC SLC
2024/2025
Quarter 3
2023/2024
Quarter 3
Year To
Date
2022/2023
Quarter 3
Year To
Date
Number Homeless applications
received 1734 -14.0% 2016 1724
Number  Homeless / Potentially
homeless decisions 1486 -11.5% 1679 1494
Caseload active 1552 -1.6% 1578 1107
Average case closure timescale 278.15 16.9% 238 208
Lets to Urgent Homeless 65.32% -2.5% 66.98% 56.38%
Permanent Offers refused 53  0% 53 74
Appeals received  248 42.5% 174 111
UH tenancy sustainment 93.50% 0.5% 93.02% 92.78%
Outcomes (Percentage of
homeless households provided
with a Scottish Secure Tenancy
(SST))
58.41% -5.63%  64.04% 69.30% 
56

Page 57

4.2. It is worth noting again actions implemented since April 2024 have had limited time
to show an impact up to the end of quarter three, particularly following sustained
increased demand over a 2-year period. It will, therefore, take a period of stability for
the pressure in the system to ease and caseload to reduce over time. 
4.3. Notwithstanding this position, and despite homeless presentations continuing at higher
rate than pre pandemic norms, latest statistics show a decrease of 14% in comparison
to Quarter 3 the previous year (2023/2024). 
4.4. Similarly positive homeless decisions have reduced by 11%, therefore, reducing the
number of households the council owes a duty of permanent housing. 
4.5. The caseload or backlog remains high, though recently shows a very slight reduction
compared to last year (1.6%), in the context of the continuing focus on prioritising the
allocation of available properties to homeless households. 
4.6. To date there has not been any reduction in timescales to resolve homelessness
which have over the last 2 years increased to a peak of an average 278 days in the
current year. This represents an increase of almost 17% compared to last year due
to the pressure in the system, it is anticipated this will reduce in time, provided the
current reducing demand trend remains stable. 
4.7. There has been a significant increase in the level of homeless appeals received over
the last 2 years, while mitigating actions may be a contributing factor, the trajectory
pre-dates their introduction. The trend can be attributed to the level of demand in the
system and the availability of housing which matches applicant preferences.  Close
monitoring of appeal reasons and outcomes is in place, with year to date, over 95% of
settled housing offers appealed have been upheld as reasonable to resolve
homelessness. 
4.8. The full range of performance measures which are used to gauge progress in relation
to homelessness, remain under constant review and the full year’s performance
against strategic outcomes will be reported to Committee at year end. 
5.  Homeless Strategic Plan Priorities for 2025/2026
5.1. The position at a national level will continue to be monitored and the Council will
continue to take every opportunity to make the case for the increased resources
required to support service delivery. 
5.2. Meantime, the Council has continued its long-standing approach to strategic
planning to meet housing and homelessness need, guided by Local Housing
Strategy objectives. 
5.3. A range of actions related to homelessness priorities, which were informed by
learning through RRTP delivery, were set out in the Homelessness Strategic Action
Plan approved by the Housing and Technical Resources Committee on 18
September 2024. 
5.4. It is proposed this approach continues for a further year through 2025/2026,
maintaining key priorities to meet homeless needs, including:- 
 continued focus on prevention of homelessness, particularly in relation to
households with children 
 further progress the homelessness priorities and actions contained within the
Strategic Commissioning Plan
57

Page 58

 continue to prioritise social housing lets to resolve homelessness and reduce
backlog, whilst balancing this with meeting wider housing need 
5.5. It is, therefore, proposed the current Strategic Homeless Action Plan (included as
appendix 1 to the report) is extended for a further year to cover 2025/2026
continuing mitigation actions, with a view to easing the pressure in the homeless
system and final performance outcomes for 2024/2025 are reported to Housing and
Technical Resources Committee at year end. 
6. Next Steps 
6.1.  Council officers will continue to closely monitor performance and a full review of the
Homeless Strategic Action Plan for 2024/2025 will be presented to Committee on 13
August 2025. 
6.2. Partnership approach to homeless prevention and response continues, in particular,
work with Health and Social Care Partners in developing the fourth Strategic
Commissioning Plan, developing prevention opportunities connected to pending
duties on public bodies (The Housing (Scotland) Bill 2024). 
6.3.  Progressing development of additional temporary accommodation, ensuring
statutory duty to accommodate continues to be met and risk in this regard is
reduced. 
6.4.   Officers will continue to work with Scottish Government officials directly and engage
in national groups focused on addressing the housing emergency locally and
nationally. 
6.5.  Progress in relation to the Homelessness Strategic Action Plan 2024/2025 will be
reported to committee on 13 August 2025 
7.  Employee Implications
7.1.  There are no employee implications as a result of this report. 
8. Financial Implications
8.1. There are no financial implications as a result of the content of this report, however,
it is worth noting uncertainty around future funding of homeless services remains a
risk for the Council. 
9. Climate Change, Sustainability and Environmental Implications
9.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
10. Other Implications
10.1. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
10.2. There are no additional risks associated with this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. There is no requirement for an equality impact assessment related to the content of
this report.  
58

Page 59

Stephen Gibson
Executive Director (Housing and Technical Resources) 
6 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Our children and young people thrive
 Good quality, suitable and sustainable places to live 
Previous References
 South Lanarkshire Rapid Rehousing Transition Plan 2019-24, Housing and Technical
Resources Committee Report, 23 January 2019
 Homeless Pressures Report to Executive Committee 12 June 2024
 Annual Review of the South Lanarkshire Rapid Rehousing Plan and 2023/24 and
Homeless Pressures Update, 16 September 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Jacqueline Fernie
Homelessness and Housing Support Manager
Ext: 5139 (Tel: 01698 455139)
E-mail: Jacqueline.fernie@southlanarkshire.gov.uk 
59

Page 60

60

Page 61

Homelessness Strategic Plan 2024/2025         Appendix 1
In our ever-evolving landscape of addressing homelessness, adaptability and strategic planning are paramount. As we revisit our RRTP action
plan, we recognise the need for clarity, alignment, and purpose. This revised plan aims to provide a concise overview of our priority outcomes,
measures and actions alongside mitigations approved to tackle the homeless emergency situation. 
The annual review for the final year of the RRTP 2023/2024 provided the opportunity to assess and report on the progress made against each of
the actions and measures contained within the plan. It also allows for a general re-examination of the RRTP, to ensure that the objectives, actions,
and measures identified, remain appropriate, relevant, and measurable.
While the RRTP placed a renewed focus on partnership planning across Scotland, locally partners have, over the last 20 years maintained a
consistent strategic focus on homelessness. Accordingly, while there is no specific requirement to continue or prepare a new RRTP to ensure a
continuity of focus partners locally have agreed to continue the current RRTP for a further year.
A report to Housing and Technical Resources Committee on 7 February 2024 set out a range of actions to help address the emergency
homelessness situation. These measures of these are incorporated within an updated RRTP outcome framework for 2024/2025 with a dual focus,
namely detailing the;
1. the actions identified to address the emergency situation; and 
2.  partnership actions which will be progressed to continue and further develop key areas previously included within the RRTP  2019/2024
While future requirements in relation to RRTPs at a national level remain to be clarified, this strategic plan reflects the continuing commitment of
the Council and Community Planning Partners to the priority objectives set out in the original document. For the purposes of the strategic plan
priority objectives 4 and 5 have been combined This reflects, that while partners remain committed to progressing Housing First funding
restrictions significantly limit the ability to upscale activity in this area.  Combining the priority objectives provides for a greater  multi agency focus
within the outcome, emphasising the need for a for a multi-agency approach to this.
Priority Outcomes:
1. Prevent homelessness occurring wherever possible thus reducing its impact
2. Limit time spent by households in temporary accommodation and minimise temporary accommodation moves before moving onto settled
homes
3. Ensure housing support provision meets the level and type of need for households to live independently within communities 
4. Enhance integration and partnership working to embed RRTP through a whole systems approach 
5. Implement and monitor the Homeless Demand Pressures Mitigations
10
61

Page 62

The plan has been reviewed to enhance efficiency and streamline processes to optimise resource utilisation.  By doing so the plan will be impact
driven by ensuring that every action and measure contributes directly to our vision: ‘Homelessness in South Lanarkshire is significantly reduced,
with homeless households moving to a settled home as quickly as possible’.  This will also strengthen collaboration and concentrate on
partnership working in line with the impending prevention duties for seamless implementation.
Actions:
The plan sets out actionable steps, assigns responsibilities, and establishes clear timelines. The plan also incorporates the mitigations set to
tackle the homeless pressures. Regular progress assessments through the continuation of the Homeless Strategy Group will guide the course
of the plan. The document will be open to adjustments and improvements as we progress and learn from our experiences. Completed actions
will be removed from the plan to ensure the document remains concise. 
Homeless Strategic Plan
Strategic Outcome 1: Prevent homelessness occurring wherever possible thus reducing its impact 
Actions
Ref. Action Start Milestone/Target Lead Partner 2025/26 Plan
A1.1 Minimise increase in level of
homelessness or maintain
homelessness levels
2024/2025 Annual  Housing and
Technical
Resources
Continuing action
A1.2
(EA)*
Reduce the number of children
affected by homelessness
2024/2025 Annual Housing and
Technical
Resources
Continuing action
A1.3 Promote homeless prevention
activities to prevent homeless as
far as possible 
2024/2025 Annual Housing and
Technical
Resources
Continuing action
A1.4
(EA)*
Complete review of prevention
approach and implement identified
service improvements 
2024/2025 March 2025  Housing and
Technical
Resources
Continuing action
A1.5
(EA)*
Undertake annual update of
Temporary Accommodation
Strategic Plan with ‘ordinary
homes’ objective 
2024/2025 Annual Housing and
Technical
Resources 
Continuing action
62

Page 63

Measures
Ref. Measure Baseline 2023/24 Target Responsibility 2025/26 Measure
M1.1 Number of homeless presentations 2728 Maintain or reduce Housing and
Technical
Resources
Continuing Measure
M1.2 Level of Households Homeless
(homelessness case load at year
end)
1579 Maintain or reduce Housing and
Technical
Resources
Continuing Measure
M1.3 Meet targets set for percentage of
social housing allocated to
homeless households by all social
housing providers in South
Lanarkshire
SLC 62.90%
RSL 43.50% 
50-60% Housing and
Technical
Resources 
RSL
Continuing Measure 
Strategic Outcome 2: Limit time spent by households in temporary accommodation and minimise temporary accommodation moves before
moving onto settled homes
Actions
Ref. Action Start Milestone/Target Lead Partner 2025/26 Plan
A2.1
(EA)*
Review existing homelessness
cases to ensure people
appropriately queued to resolve
homelessness 
2024/2025 6 monthly report on
progress
Housing and
Technical
Resources 
Action completed
2024/25
A2.2 Minimise the number of moves
between types of
accommodation by utilising
emergency accommodation
2024/2025 Annual Housing and
Technical
Resources 
Continuing action
63

Page 64

A2.3 Increase affordable housing
supply by progressing actions
within the LHS and SHIP to
increase supply through new
build, acquisitions and bringing
long term empty properties into
use.
2024/2025 Aligned with
Strategic Housing
Investment Plan
(SHIP) and the Local
Housing Strategy
(LHS). Annual target
will be set and
detailed in the
Strategic Local
Programme
Agreement,
developed between
SLC and the
Scottish
Government.
Housing and
Technical
Resources 
RSL
Scottish
Government
Continuing action
A2.4
(EA)*
Complete the Personal Housing
Plan review. 
2024/2025 April 2024  Housing and
Technical
Resources 
Action completed
2024/25 
Measures
Ref. Measure Baseline 2023/24 Target Responsibility 2025/26 Measure
M2.1 Reduce the average time spent
in temporary accommodation
181.5 days Manage in line with
Temporary
accommodation
model requirements
Housing and
Technical
Resources 
Continuing Measure
M2.2 Convert temporary
accommodation units to SST
wherever possible 
12 10 Housing and
Technical Resources 
RSL
Continuing Measure
64

Page 65

M2.3 Increase the number of
affordable homes added to the
housing supply (new and market
purchase)
SLC 269
RSL 177
Aligned with the
SHIP
Housing and
Technical Resources 
RSL
Continuing Measure
M2.4 Number of long term empty
properties are brought back into
use in South Lanarkshire
28 15 Housing and
Technical Resources 
Continuing Measure
M2.5 Increase the number of
homeless households whose
housing needs are met in the
private rented sector
24 Increase on
previous year
Housing and
Technical Resources 
Continuing Measure
Strategic Outcome 3: Ensure housing support provision meets the level and type of need for households to live independently within communities 
Actions
Ref. Action Start Milestone/Target Lead Partner 2025/26 Plan
A3.1 Monitor, evaluate and adapt
housing support services to
improve homelessness
prevention and support tenancy
sustainment across all tenures
2024/2025 Annual Housing and
Technical
Resources 
3rd Sector Partners
Continuing action
A3.2 Complete an assessment of the
availability of housing support
services
2024/2025 Annual Housing and
Technical
Resources 
Continuing action
A3.3 Continue to develop and
implement approaches to prevent
youth homelessness, with a
particular focus on pathway
approach to meeting the needs of
care experienced young people
2024/2025 95% pathway plans
in place 
95% sustainment
Housing and
Technical
Resources 
Social Work
Resources
Continuing action
65

Page 66

A3.4 Deliver Private Sector Innovation
Fund and Sustainment service
providing financial support to
private rented tenants to prevent
homelessness
2024/2025 Widen scope of
service delivery
Housing and
Technical
Resources 
Right There
Future delivery
model under
consideration for
2025/26
A3.5 Prepare and publish a domestic
abuse policy setting out how
tenants affected by domestic
abuse will be supported and a
view to preventing homelessness
2025/2026 Publish Policy Housing and
Technical
Resources 
Continuing action
A3.6  Implement new commissioning
approach
2024/2025 Introduce consortium
approach to
commissioning 
Housing and
Technical
Resources
Corporate and
Finance 
Continuing action
A3.7 Implement actions of Housing
Support Review
2024/2025 New Housing
Support lead role 
Housing and
Technical
Resources 
Action completed
2024/25 
Measures
Ref. Measure Baseline 2023/24 Target Responsibility 2025/26 Measure
M3.1 Ensure all homeless households
who require support are provided
with Housing Support Officer
assistance, including specialist
and intensive where required
100% Maintain 100% Housing and
Technical
Resources 
Salvation Army
Blue Triangle
Housing Association
Continuing Measure
66

Page 67

M3.2 Maintain or improve the
percentage of former homeless
households provided with an SST
that maintain their home for more
than 12 months
91% Maintain/improve on Housing and
Technical
Resources 
Continuing Measure
M3.3 Sustain a low percentage of all
homeless presentations which are
repeated (within 12 months) 
3.6% Reduce to less than
3% 
Housing and
Technical
Resources 
Continuing Measure
M3.4 Reduce the number of homeless
presentations that result in the
application being withdrawn
1.9% Reduce form the
previous year
Housing and
Technical
Resources 
Continuing Measure
M3.5 Reduce the number of homeless
applications were contact is lost
with the applicant 
5.7% Reduce form the
previous year
Housing and
Technical
Resources 
Continuing Measure
M3.6 Continue to develop and
implement approaches to support
victims of domestic abuse and
prevent homelessness 
100% 100% HTR
representation at
MARAC
Housing and
Technical
Resources 
BTHA
Say Women
Continuing Measure
M3.7 Continue to deliver SHORE
standards for people entering and
exiting prison 
533 Double interactions
from 2022/23 
Housing and
Technical
Resources 
ADP
Social Work
Resources
Continuing Measure
Strategic Outcome 4: Enhance integration and partnership working to embed RRTP through a whole systems approach 
Actions
Ref. Action Start Milestone/Target Lead Partner 2025/26 Plan
67

Page 68

A4.1 Continue our Housing First
approach to be the first partnership
response for households with
multiple complex needs
2024/2025 Maintain  Housing and
Technical
Resources 
Continuing action
A4.2 Expand workforce development
and training across partners Ensure
training and development across
partners contains effective
communication, coordination, and
referral processes to ensure that
individuals receive the right support
and services at the right time (Ask
& Act)
2024/2025 Ongoing All specified bodies Continuing action 
Measures
Ref. Measure Baseline Target Responsibility 2025/26 Measure
M4.1 Number of new Housing First
cases in year 
4 Maintain Housing and
Technical
Resources 
Salvation Army
SACRO
Continuing Measure
M4.2 Promote ‘routine enquiry’ across
all health and care services
through the review of the
Strategic Commissioning Plan
and in line with the forthcoming
Prevention Duties 
- Increase Health & Social Care
Partnership 
Housing and
Technical
Resources 
Continuing Measure
68

Page 69

M4.3 Prioritise access to general
medical and universal health
screening services for homeless
people, including primary care
(GP), prescribing, dentists, etc 
Increase Health & Social Care
Partnership 
Housing and
Technical
Resources 
Continuing Measure
M4.4 Increase awareness of
homelessness issues and
services, particularly within the
Third Sector 
Access to pathways
monitored via
VASLAN and third
sector agencies 
Housing and
Technical
Resources 
VASLAN 
Continuing Measure
M4.5 Deliver Housing Options and
homelessness awareness training
to young people, targeting high
schools in areas identified with
high homelessness rates
amongst young people
-  Housing and
Technical
Resources 
Education
Resources
Continuing Measure
M4.6 Continue to explore employment
and training pathways for
homeless/potentially homeless
households
Access to pathways
monitored via
Employability 
Housing and
Technical
Resources 
Employability
DWP
Continuing Measure
M4.7 Promote Digital Inclusion for
homeless/potentially homeless
households
Access to services
monitored via FIN
Sub-Group 
Housing and
Technical
Resources 
Continuing Measure
69

Page 70

Financial Inclusion
Network Digital
Inclusion Subgroup
Strategic Outcome 5: Implement and monitor the Homeless Demand Pressures Mitigations (EA)*   
Measures
Ref. Measure Start/Baseline Target Responsibility Progress
M5.1 Homeless Pressures Update
Report to Housing Committee
2024/25 February 2025 Housing and
Technical
Resources 
Action completed
2024/25
M5.2 Continue to brief staff on further
actions and service
developments to address
pressure on homelessness
service 
2024/25 March 2025 Housing and
Technical
Resources 
Action completed
2024/25
M5.3 Review scrutiny group findings on
access to homeless service and
incorporate improvements as
appropriate.
2024/2025 September 2024 Housing and
Technical
Resources 
Action completed
2024/25, feedback
informing future
planning
M5.4 Consider wider urgent need –
SHORE, GBV, Housing First -
impact
2024/2025 March 2025 Housing and
Technical
Resources 
Continuing action
M5.5 Review of webpages 2024/2025 June 2024 Housing and
Technical
Resources 
Continuing action
70

Page 71

M5.6 Communicate
approach/implementation plan to
staff:
• Staff
• Tenants & customers (UH
applicants)
• Elected Members
• Partners - H&SCP, 3rd
Sector, ADP, CAB
• Trade Unions
• Regulator
2024/2025 May 2024 Housing and
Technical
Resources 
Action completed
2024/25
M5.7 Revise communications to
ensure effectively reference the
current pressure on service
Consider strapline on emails for
homeless service
2024/2025  2024 Housing and
Technical
Resources 
Action completed
2024/25
M5.8 Routine Performance monitoring
will inform ongoing evaluation 
2024/2025 Ongoing Housing and
Technical
Resources 
Continuing action
M5.9 Develop revised Homeless
induction and L & D programme
2024/2025 August 2024 Housing and
Technical
Resources 
Continuing action
M5.10 Implementation of HOME system 2024/25 January 2025 Housing and
Technical
Resources 
Continuing action
• *EA – Emergency Action
71

Page 72

72

Page 73

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: South Lanarkshire Council Housing Repairs Policy 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek endorsement from Housing and Technical Resources Committee for the
introduction of the revised South Lanarkshire Council Housing Repairs Policy
with effect from 5 May 2025 
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:- 
(1) that the revised South Lanarkshire Council Housing Repairs Policy, attached
as Appendix 1 to the report, be endorsed;
(2) that the revised policy be submitted to the Executive Committee on 30 April
2025 for approval; and 
(3) that the revised policy be implemented with effect from 5 May 2025. 
3. Background
3.1. The Council has a statutory duty to provide a repairs service to maintain its housing
stock and related assets to an acceptable standard, as contained in the Housing
(Scotland) Act 2001.  This Act also requires that Council tenants are formally
consulted in relation to any policy and service revisions. 
3.2. The current Housing Repairs Policy was approved by the Housing and Technical
Resources Committee on 23 May 2018 and sets out the Council’s approach to
dealing with repairs to Council housing stock and related assets. 
3.3. In accordance with the Housing and Technical Resources Policy and Strategy review
schedule, approved by this Committee on 8 November 2023, a review of the Housing
Repairs Policy was undertaken during 2024. 
3.4. An internal officer group worked in partnership with tenant representatives from the
Tenant Participation Co-ordination Group, Repairs Sub Group to carry out the
review.  The review involved an appraisal of the current policy, including repair
responsibilities, service standards and actions required to ensure the policy supports
a prompt, efficient and effective housing repairs service.  Consideration was also
given to statutory and regulatory requirements and operational practices. 
3.5. This work informed the development of the consultative draft policy which was
issued for formal consultation on 17 September 2024. 
11
73

Page 74

4. Consultation process
4.1. Formal consultation on the draft Housing Repairs Policy took place between 17
September and 13 December 2024.  The consultative draft policy was published on
the Council’s website, together with an online questionnaire, developed to guide
responses in relation to the following key aspects of the policy:- 
 introduction to the policy
 policy objectives
 access to the repair service
 Council and tenant repair responsibilities
 rechargeable repairs
 service standards 
The questionnaire also gave respondents the opportunity to provide additional
comments in relation to the policy. 
4.2. The consultative draft policy was promoted via the Council’s social media platforms
and through the digital edition of Housing news.  Texts and emails containing a link
to the draft policy and online questionnaire were issued to Council tenants, tenant
and resident groups, interested individuals and members of the People’s Panel.  The
consultation on the draft policy was also highlighted to a range of other stakeholders
including, Housing Association partners, Lanarkshire Carers, the South Lanarkshire
University Health and Social Care Partnership and Armed Forces Community
Organisations. 
4.3. During the consultation, an awareness session for Elected Members was held on 2
October 2024, providing an overview of the policy, the consultation arrangements
and the opportunity to discuss the policy in more detail. 
4.4. Discussions on the policy proposals also took place with key stakeholders and
interested groups including:- 
 South Lanarkshire Tenant Participation Co-ordination Group
 South Lanarkshire Disability Partnership Housing Sub-Group
 Gypsy/Traveller site residents
 homelessness service users
 Sheltered Housing tenants
 East Kilbride Sheltered Housing Forum
 employees within Housing and Property Services teams 
4.5. A total of 977 responses were received from individuals and organisations who
completed the online questionnaire.  Detailed below is a summary of the responses
received to the key questions within the questionnaire:- 
 91% of respondents agreed that the introduction to the policy clearly set out the
purpose of the policy
 84% of respondents agreed that the policy objectives are clear and appropriate
 85% of respondents agreed that the policy clearly sets out how the repairs
service can be accessed
 87% of respondents agreed that tenants who breach their tenancy agreement
through damage to or misuse of their home should be recharged for the work
required to repair/reinstate
 79% of respondents agreed with the service standards
74

Page 75

4.6. The views and comments received during the consultation were taken into account
and informed the development of the revised policy.   
5. Summary of Changes to the Housing Repairs Policy 
The revised Housing Repairs Policy reflects the comments made during the
consultation but remains fundamentally based on the current Policy.  The revised
Policy will continue to support the Council’s approach to providing a prompt, efficient
and effective housing repairs service.  A summary of key changes made to the
sections within the policy are set out below:- 
5.1. Introduction
5.1.1. includes reference to highlight the significance of rechargeable repairs and the   
availability of further information on the Council’s website. 
5.2. Policy Objectives
5.2.1. Objectives have been updated to include more detail on the Council’s compliance
with legal duties. 
5.2.2. An emphasis is placed on tenants’ responsibilities to provide access to carry out
essential health and safety checks. 
5.2.3. The aim of completing non-emergency repairs first time where possible, is
confirmed. 
5.3. Access to the service
5.3.1. To help ensure the service is as accessible as possible, details are provided on the
range of ways a tenant can report a repair. 
5.3.2 Methods no longer in use have been removed. 
5.4. Repairs Responsibilities and Rechargeable Repairs 
5.4.1. Additional information provided in relation to health and safety obligations and the
need for tenants to provide access. 
5.4.2. The requirement for written permission for tenant alterations is highlighted along with
confirmation that no alterations are allowed to health and safety installations
including fire doors. 
5.4.3. Further information on rechargeable repairs is provided. 
5.5. Delivering the Service and Service Standards
5.5.1 Highlights tenants’ obligation to allow access for repairs and advises on
circumstances where the council may force entry. 
5.5.2 Further detail is also provided in relation to owners’ responsibility for common repairs
and essential health and safety inspections. 
5.6. Comments, Compliments and Complaints
5.6.1 Updated to provide more information on making a complaint. 
6. Overview of the Revised Policy
6.1. The policy sets out the Council’s approach to delivering a repair service to Council
homes and related assets in relation to:-
 repairs reported directly by customers
75

Page 76

 repairs identified through routine management of housing stock and estates
 planned programmes of maintenance 
6.2. The Policy sets out a range of objectives to support the delivery of a high quality,
efficient and comprehensive housing repairs service and ensures that the services
provided are effective and achieve high standards of customer care.  A number of
actions are detailed and contribute towards the achievement of these objectives. 
6.3. The Policy aims to make the housing repairs service as accessible as possible and
sets out a range of ways tenants can report repairs and obtain information on the
service. 
6.4. Both the Council and tenants’ responsibilities are clearly defined, as well as the need
for tenants to obtain permission from the council before carrying out any work on
their home.  The Policy also highlights circumstances in which a tenant may be
recharged for a repair. 
6.5. A focus of the Policy is to support the council to meet legislative compliance duties
and emphasis is placed on tenants allowing access to their home for essential health
and safety work to be carried out. 
6.6. The Policy details how the repairs service is delivered and includes information on
categories of repairs and associated service standards and other service areas
including; planned maintenance, common repairs and annual servicing.  
6.7. The full Policy document is set out in Appendix 1 to the report. 
7. Next Steps
7.1. Subject to endorsement by Housing and Technical Resources Committee, the
revised Housing Repairs Policy will be presented to Executive Committee for
approval on 30 April 2025. 
7.2. Subject to Executive Committee approval, the revised policy will be implemented
from 5 May 2025. 
7.3. A review of existing procedures and documentation is underway to ensure alignment
with the revised Policy. 
8. Employee Implications
8.1. There are no employee implications associated with this report. 
9. Financial Implications
9.1. There are no financial implications associated with this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
11. Other Implications
11.1. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement to the Scottish Housing Regulator. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. An integrated impact assessment has been completed as part of the development of
the Housing Repairs Policy.  The assessment of the revised repairs policy has
76

Page 77

confirmed the positive contribution the repairs policy will make to support tenants
and ensure effective delivery of tenants’ rights.   
12.2. As noted in Section 4 in the report, consultation on the draft Housing Repairs Policy
took place between September and December 2024. During this period, a range of
consultation events and discussions took place with stakeholders and other
interested parties, including an awareness session for elected members, held on 2
October 2024.  The views and comments received during the consultation informed
the development of the finalised policy document. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
13 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Working with and respecting others
 We will work to put people first and reduce inequalities
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities 
Previous References
 Housing and Technical Resources Committee Report – Housing Repairs Policy
Review 23 May 2018 
List of Background Papers
 None 
Contact for Further Information
If you want further information or background papers, please contact:- Craig Jardine, Head
of Property Services, Housing and Technical Resources
Phone: 01698 454073
E-mail: craig.jardine@southlanarkshire.gov.uk 
77

Page 78

Appendix 1 
Housing and Technical Resources 
Housing Repairs Policy 
If you need this information in another language or format, please contact us to discuss how we can
best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk
78

Page 79

Contents 
1. Introduction 
2. Policy objectives 
3. Access to the service 
4. Repair responsibilities and rechargeable repairs 
5. Delivering the service and service standards 
6. Comments, compliments and complaints 
7. Monitoring and review 
8. Equal opportunities 
9. Glossary of terms 
79

Page 80

1. Introduction 
1.1 The council has a legal duty to provide a repairs service to maintain our housing stock and
related assets to an acceptable standard. 
1.2 This policy document sets out our approach to dealing with repairs to council houses and
related assets and details the following: 
• the policy objectives 
• access arrangements for the service
• repair responsibilities of both South Lanarkshire Council, as the landlord, and the tenant
(including rechargeable repairs)
• service standards
• delivering the service and service standards
• comments, compliments and complaints
• monitoring and review 
1.3 The policy covers the responsive and planned repairs service we provide in relation to: 
• repairs reported directly by tenants
• repairs identified through routine management of the housing stock and estates
• planned programmes of maintenance, including communal and external areas that we are
jointly responsible for with other owners 
The policy does not cover improvement works carried out through the Capital Investment
Programme. 
1.4 The policy reflects legal requirements and the terms of the South Lanarkshire Council Scottish
Secure Tenancy Agreement and is supplemented by more detailed information for tenants
contained in a range of publications, including the Tenant’s Guide to Repairs which is
available on the council’s website at www.southlanarkshire.gov.uk 
1.5 To complement the work carried out to improve our housing stock to the Scottish Housing
Quality Standard (SHQS) through the Capital Investment Programme, the repairs service
plays a key part in ensuring that our housing stock is maintained to a high standard. 
The council will continue to invest in energy efficiency measures to help reduce running costs
for tenants and install zero direct emissions heating systems where appropriate. 
1.6 This policy is effective from 5 May 2025 and replaces all previous policies. 
80

Page 81

2. Policy objectives 
2.1 The council aims to provide tenants with a high quality, efficient and comprehensive housing
repairs service. 
2.2 The objectives of the policy are to: 
• provide a prompt, efficient and effective housing response repairs service 
• maximise the useful life of council housing stock and related assets 
• ensure homes are warm, comfortable and in a good and safe condition of repair and
continue to meet the requirements of national housing standards
• maximise planned maintenance programmes 
• achieve high standards of customer care 
• comply with our legal duties including access to carry out essential health and safety
checks, for example, gas servicing and electrical safety testing
• ensure ease and equality of service access and outcome 
2.3 To help achieve these objectives, we will: 
• ensure all tenants are provided with clear information on their repair responsibilities and
what we will do when the repair is our responsibility
• ensure tenants are aware of their responsibilities in allowing access to their home for
essential health and safety inspections or repairs, as required and in accordance with
section 5 of their Scottish Secure Tenancy Agreement 
• advise tenants when they report a repair, whether there is a need for an inspection before
the work is carried out and make an appointment if required
• carry out repairs in accordance with our published service standards
• carry out non-emergency repairs on an appointment basis and where possible, complete
repairs at the first visit
• provide an emergency repairs service
• carry out post inspection of a range of repairs to ensure that they are completed to the
agreed standard
• recharge repair costs from tenants who wilfully, or through neglect, damage their homes
(see section 5 of the Scottish Secure Tenancy Agreement and the Tenant’s Guide to
Repairs)
• consult and seek feedback from tenants to ensure that the services provided are
appropriate and effective 
• monitor and continuously improve the performance of staff and contractors, taking into
account feedback from tenants
• review and where appropriate implement examples of best practice, and ensure value for
money 
2.4 Section 5 of this policy sets out our service standards and section 7 details the arrangements
for monitoring progress with the service and achieving the policy objectives. 
81

Page 82

3. Access to the service
3.1  The council is committed to making the housing repairs service open and accessible to all
tenants.   
3.2 There are a number of ways to report repairs, which are designed to make the service as
accessible as possible, including: - 
• online through our website
• by telephoning, writing or emailing 
• report emergency repairs out with office hours by telephoning the emergency out of hours
service 
3.3 Addresses and telephone numbers are detailed in publications and publicised on the council’s
website. 
3.4 We will provide a range of clear information on the housing repairs service, including: 
• repairs that we are responsible for
• repairs tenants are responsible for
• how to report a repair
• how we will respond to repair requests
• carrying out the work
• comments, compliments and complaints 
3.5 Information on the housing repairs service is issued to all new council tenants as part of the
tenancy sign-up process and is available on the council’s website at
www.southlanarkshire.gov.uk 
3.6 Where required, we will provide assistance to tenants with a disability and/or who are
vulnerable to access the repairs service. 
4. Repair responsibilities and rechargeable repairs
4.1 The council is responsible for the majority of repairs to the structure and outside of the
building and to the fixtures and fittings in the home, to keep the structure of homes in good
repair and to keep them wind and watertight. 
4.2 We have a number of planned maintenance programmes in place, designed to ensure the
safe and healthy occupancy of the home for tenants, their family and neighbours. These
include annual servicing of all heating systems and five yearly electrical wiring checks. These
programmes are carried out without the need for tenants to request the work and the main
obligation on tenants is to provide access to their home in order to complete the works. 
4.3 Whilst we are responsible for most repairs, tenants also have a responsibility for some repairs
within their home.  The main types of repairs for which the tenant is responsible are detailed
within the ‘Tenant’s Guide to Repairs’ and include: - 
• decoration, including repairs to minor cracks, holes in plasterwork, laminate flooring and
painted kitchens/wraps
• damage/breakages caused by neglect or carelessness of the tenant, their family or
visitors to their home 
• any floor coverings, including vinyl floor covering fitted as part of the Home+ Programme,
but excluding floorboards and concrete flooring
82

Page 83

• supplying and fitting plugs and chains to sinks, basins and baths
• fixtures and fittings e.g. curtain rails, decorative light fittings, external lights 
• light bulbs, fluorescent tubes or starters, plugs or fuses connected to appliances, unless
fitted by the council 
• batteries for battery operated smoke alarms
• cookers, refrigerators and washing machines (including the installation of washing
machines) unless we provided them as part of a tenancy 
• extra door or window locks, spyholes or security chains 
• divisional fencing and outhouses
• shower curtains
• heating and ventilating the home to prevent condensation which may result in dampness.   
The above list is not exhaustive and there may be other repairs the tenant is responsible for. 
4.4 As detailed in section 5 of the Scottish Secure Tenancy Agreement, tenants wishing to carry
out work to their properties beyond their general responsibilities, must get our written
permission first. We will not refuse permission unreasonably. We may grant permission with
conditions, relating to the expected standard of work. 
We will generally grant permission if we are satisfied that:
• the work will be carried out to a sufficient high standard, using material of a suitable quality
• the work will be carried out by a qualified person
• the work will not impact neighbouring properties
• where appropriate the tenant has obtained any necessary legal consents
• the work does not alter any health and safety installations including fire doors 
4.5 It is recognised that there may be tenants who, as a result of their individual circumstances,
are unable to carry out repairs they are responsible for. In these situations, additional support
and assistance may be available to the tenant to complete the repair. 
4.6 Rechargeable repairs
Tenants must pay for any repairs that have occurred as a result of: 
• damage or misuse caused by them, their family or visitors to their home 
• gaining access into their home and changing locks when they have lost their keys 
• the replacement of broken glass 
• alterations to the property without written consent from the council, including fire doors or
any other alteration to health and safety installations 
Section 5 of Scottish Secure Tenancy Agreement provides further information relating to re-
chargeable repairs and tenant responsibilities.  
Whilst the list above identifies the most common re-chargeable repairs, it is not exhaustive. 
5. Delivering the service and service standards
5.1 When the council is contacted with a repairs request, we will confirm whether the 
repair is our responsibility and: 
• help identify the repair needed which may include visiting the property to carry out an
inspection
83

Page 84

• explain to the tenant how long it will take to complete the repair or inspection
• offer a convenient appointment time for all inspections and internal repairs 
• telephone/write to/text the tenant to confirm details of all repairs by appointment and
external works. 
5.2 In line with legal requirements, we operate the ‘Tenant’s Right to Repair’ scheme. This allows 
tenants to arrange for certain repairs to be carried out by an alternative contractor if we 
have not responded within our publicised timescales. Tenants are advised when they report 
a repair to the Repairs Team if it is a ‘qualifying repair’ under this scheme. Compensation will 
be paid to tenants, where appropriate, in line with our legal obligations. Tenants will be
required to submit their request for compensation in writing. 
5.3 It may be necessary for us to carry out an inspection before work is carried out to identify the
materials needed to complete the repair. If we do, we will arrange a weekday morning or
afternoon appointment time for this visit to take place within five working days of the repair
being reported. Where possible we will arrange appointment times that are suitable to the
tenant. During the inspection the Technical Officer will advise the tenant of any repair works
needed and the expected timescale for completion. 
Service standards
5.4 Work will be prioritised and instructed based on the type of repair and the risk posed to health
and safety. Repair categories, together with their associated timescales for completion, are
noted below: 
• Emergency repairs – we aim to complete these repairs within 24 hours. These repairs will
generally be attended to within six hours of the fault being reported. No appointments will
be made for emergency repairs, but we will discuss a suitable time to access tenants’
homes to make sure that the emergency work can be done. This category of work will
generally involve making the fault safe and thereafter we will make an appointment,
suitable to the tenant, to carry out any further work which may be required. 
The types of repairs carried out through this category include, but are not limited to, burst
pipes, faulty electrics, no heating, security and health and safety issues. 
• Repairs by appointment – these are provided for the majority of work where we require
access to homes. Where possible we will try to arrange appointment times that are suitable
to the tenant. We aim to have these works carried out within 28 days from date of request.
With all internal works we aim to have these repairs completed, where possible, at the first
visit.   
The types of repairs carried out through this category include, but are not limited to, internal
repairs to doors, floorboards, plasterwork, electrical and plumbing works. 
• External works – these are provided where the work is not urgent, and we do not need
access to the home. We aim to have these works carried out within 60 days from date of
request. 
The types of repairs carried out through this category include, but are not limited to,
roughcast, boundary fencing, roofing, lock ups, gutters and downpipes. 
5.5 For repairs by appointment and external works we will confirm to tenants the detail of the
repair requested and the agreed appointment date and time. 
5.6 Work required to enable tenants to be discharged from hospital
Work required to a tenant’s home, to enable them to be discharged from hospital, will be
prioritised.   These works will be organised and arranged quickly in conjunction with Health
and Social Care partners.   
84

Page 85

5.7 Access to your home 
Tenants are required under the terms of their Scottish Secure Tenancy Agreement to allow us
as their landlord, access to their home to inspect, carry out repairs, or do other works that are
necessary to their property or adjoining properties.  As a last resort, where we have a health
and safety or legal obligation to carry out works, or where there is an emergency, we reserve
the right to force entry. 
5.8 Planned and cyclical maintenance
In addition to repair categories detailed at 5.4, we also carry out planned and cyclical
maintenance works. This includes, but is not limited to, cleaning gutters, clothes poles, slab
repairs and external paint work. 
Through the housing repairs service, we also aim to undertake additional work such as gutter
cleaning and external paint work on a planned programme rather than on a responsive basis.
This ensures that investment made to bring the housing stock up to the Scottish Housing
Quality Standard (SHQS) is protected in the long term. 
Regular surveys of council housing and related assets will be undertaken to inform future
works programmes and tenants/owners will be kept informed throughout. 
5.9 Common repairs 
All property owners have a responsibility to meet a share of the cost of the maintenance of
common parts of buildings that the council maintain. If the block is factored by the council, we
will inspect and instruct repairs then recharge them to owners in  accordance with the title
deeds or deeds of declaration of conditions for their home. 
There are a number of blocks of flats in South Lanarkshire where the block is not factored by
the council, but the council retains housing stock. In these cases, it is the responsibility of the
owners managing the maintenance of the common parts of the building to progress any
repairs required. Pemission should be sought from the council and owners and, in terms of the
property titles, should be consulted ahead of any common area works. 
Ahead of any work being undertaken, we would strongly recommend that owners should first
consult a solicitor. This will provide clarification from the property title deeds on whether the
permissions required from the owners in the block should be by majority or unanimous to
allow works to proceed; and for any further advice or recommendations on how to proceed. 
5.10 Annual servicing
The contractors appointed by the council will contact the tenant directly to make initial
arrangements for access regarding annual servicing of all gas and solid fuel appliances, as
well as lifts and fire/intruder alarms etc. 
5.11 Heating Systems 
We place a high priority on the safety of all our heating systems. All reasonable efforts will be
made to arrange a convenient appointment with tenants to have these works carried out, but if
we are unable to do so, we may need to force entry at a date and time notified to the tenant.
The cost of forcing entry will be recharged to the tenant. 
5.12 Essential Health and Safety Inspections 
By law, we need to carry out inspection programmes of health and safety installations for
example, annual gas servicing and fixed electrical testing every five years (which also
includes inspection of smoke and carbon monoxide alarms). This is to ensure the safety of
tenants, their families and neighbours. We place a high priority on health and safety
inspections. All reasonable efforts will be made to arrange a convenient appointment with
tenants to have this work carried out. 
Where we cannot gain access to carry out essential work, we reserve the right to force entry
to carry the work out.
85

Page 86

5.13 Carrying out the work
When repair work is being carried out, we will treat tenants’ homes with courtesy and respect
and expect tenants to treat us in the same way. 
While on site we will: 
• always display identification badges 
• explain the work we have come to do
• advise which rooms we will need to work in
• advise on whether any furniture or floor coverings (including laminate flooring) require to
be moved to allow access to complete the work. This is normally the tenant’s
responsibility, however, if help and assistance is required to move carpets or furniture, we
will aim to assist.
• advise approximately how long the work will take 
When tenants, members of their household or visitors’ actions or behaviours are considered
unacceptable, we will take appropriate action in line with the council’s policy for dealing with
unacceptable actions. 
We aim to carry out all works with the minimum mess and disruption possible and when the
repair is complete, we will remove any debris. 
5.14 Compensation
Where we have caused damage to any fixtures and/or fittings in a tenant’s home, we will
endeavour to repair or replace these and where this is not possible, a third-party claim form
will be provided. On completion by the tenant the claim form will be assessed by our Risk
Management Service and any compensation will be paid in accordance with the assessment
made. 
Where dehumidifiers are required, whilst we try to complete repair works, we will pay
compensation based on an agreed daily rate for each day that they are needed. 
Please note, where there are monies owed to a South Lanarkshire Council account, it is
standard practice to transfer any compensation to reduce an outstanding balance before any
remaining monies will be issued. 
6. Comments, compliments and complaints
6.1 We are committed to providing high quality services to tenants, but we know that sometimes
we may get this wrong. When this happens, we want tenants to tell us about it in order that we
can put things right. Similarly, we want tenants to let us know if they are happy with the
service we provide. 
6.2 There are a range of ways that tenants can provide views on the service including: - 
• online through our website
• by telephoning, writing to or emailing our Repairs Team
• by completing and returning a satisfaction questionnaire
• by providing feedback to tenant’s groups/local housing meetings etc 
6.3  Tenants dissatisfied with any aspect of the service have the right to make a complaint through
the council’s comments and complaints scheme. Complaints will be accepted either in writing
or verbally and can be registered in two ways: 
• through a housing office, where staff will register the complaint; or
86

Page 87

• by completing and returning the comments and complaints scheme form 
Further information on the comments and complaints scheme can be found on the council’s
website at www.southlanarkshire.gov.uk. 
If, after making a complaint, a tenant continues to be dissatisfied with the service that they
have received, a further complaint can be made to the Scottish Public Services Ombudsman.
The Ombudsman will only consider complaints of injustice or hardship as a result of
maladministration or service failure.
The address of the Scottish Public Services Ombudsman is:
Bridgeside House, 99 McDonald Road, Edinburgh, EH7 4NS (FREEPOST SPSO) 
7. Monitoring and review
7.1 To ensure that the policy is achieving the objectives set out in section 2, it will be subject to
regular monitoring and review. 
7.2 Regular reports on performance will be provided to a range of audiences including: - 
• Housing and Technical Resources, Resource Management Team 
• Tenant Participation Co-ordination Group - Repairs Sub Group 
• Tenants, via local housing meetings, publications such as Housing news and through
other council social media platforms 
8.  Equal opportunities
8.1 This policy is consistent with the council’s Equal Opportunities Policy and aims to ensure that
we act fairly and lawfully on all occasions. We will not discriminate against anyone on the
grounds of race, colour, ethnic origin, nationality, gender, sexuality, disability, age, religion or
other belief. 
8.2 An Integrated Impact Assessment has been carried out to ensure that the policy is inclusive
and does not unfairly disadvantage any groups within the community.  We will continue to
monitor the policy to ensure that it achieves all equalities objectives set. 
9.  Glossary of terms 
Scottish Housing Quality Standard (SHQS) 
All social landlords (including the council) must ensure the homes they rent meet a minimum
standard set out by the Scottish Government. 
Home+ Programme
The council’s programme for delivering new homes and improving existing homes to meet the
Scottish Housing Quality Standard. 
Scottish Secure Tenancy Agreement (SSTA)
The SSTA was introduced by the Housing (Scotland) Act 2001.  It is a legal agreement which
sets out tenant’s rights and responsibilities and is signed by every council tenant. 
Capital Investment Programme
A programme of projects to renew major elements of work in council homes such as kitchens
and bathrooms, windows and doors and central heating systems. 
Tenant’s Right to Repair scheme
87

Page 88

A scheme which was established in law and sets out rules to allow tenants to have certain
types of repairs, which affect health and safety or security, carried out and the landlord pays
for it. 
Planned and cyclical maintenance
Works that are required to a number of homes within an area or areas, such as close painting,
cleaning gutters or fascia replacement. 
88

Page 89

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Hollandbush Golf Course and Clubhouse,
Lesmahagow – Community Asset Transfer to
Hollandbush Golf Club 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for a lease of Hollandbush Golf Course and
Clubhouse, by Hollandbush Golf Club, and seek approval to the principal terms
and conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at Hollandbush Golf Course and Club, New Trows Road,
Lesmahagow, ML11 0JS be leased to Hollandbush Golf Club, subject to the
terms and conditions outlined in Section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. Hollandbush Golf Course is managed by South Lanarkshire Leisure and Culture
(SLLC). However, following a review of it’s business plan, the SLLC Board announced
that it could not sustain service delivery from this facility and control was returned to
the Council. 
3.2. Hollandbush Golf Club wish to take over the management of the golf course, the
maintenance of the site and the development of environmental improvements
throughout the course.  The trustees of this organisation are already involved in the
current Golf Club and have successfully managed the Club House and Social Events
at the venue. 
3.3.     The Club submitted a request for Community Asset Transfer (CAT) of the golf course
and club, the validation date for which was 6 September 2024.  Public consultation
was undertaken, and no negative comments or objections were received.  Support for
the application has come from a wide range of political figures and a broad range of
partners, including Scottish Golf and other courses.   
3.4. The request was placed before the CAT Assessment Panel on 20 January 2025 when
the following matters were taken into consideration.
12
89

Page 90

3.5. Property
3.5.1. The extent of the property is shown in Appendix 1 to the report and comprises of an
18-hole municipal golf course, clubhouse and ancillary buildings.  The course is laid
out on the edge of a moorland area and is defined as a par 70 course measuring, 6262
yards.  The golf course also contains a practice ground. 
3.5.2.  As there is no proposed change of use or development, planning consent will not be
required for continued use. 
3.6. Organisation
3.6.1. The organisation is a single tier Scottish Charitable Incorporated Organisation (SCIO)
registered number SC053521, having registered this entity with Scottish Charity
Regulator (OSCR) on the 22 July 2024. 
3.6.2. This organisation has been established as a constituted vehicle for the purposes of
the provision of recreational facilities, the organisation of recreational activities, service
user wellbeing and advancing public participation in the sport of golf.  The trustees of
this organisation are already involved in the current Golf Club and the skills of the
Board members demonstrates a depth of knowledge of the course and golf club
memberships and overall management. 
3.7. Project
3.7.1. The proposal is for the Club to take over the management of the golf course, the
maintenance of the site and development of environmental improvements throughout
the course.  It will employ, and manage, a team of greenkeeping and administrative
staff. Trustees will oversee the strategic direction and source funding to develop and
enhance the facilities. 
3.7.2. The applicant organisation is newly established, however, its trustees, volunteers and
supporters have a successful history of running the club house and social events at
the venue.  Hollandbush Golf Club has been active since 1954 and existing surpluses
generated demonstrate prudent financial management and ability to generate income
from non-course activities.  Surpluses generated from this activity have been allocated
to supporting this application and assisting with cash flow in year 1 of the proposed
new lease through interest free loans. 
3.7.3 While there are reservations about the sustainability of the proposal and the capacity
to finance the current operational costs, based on the known operational costs from
SLLC, the club is confident that it can reduce and meet the operating costs based on
the assumptions in the Business plan. 
3.7.4 The applicant has produced a business plan, which recognises local priorities and
confirmation of need.  To achieve their end aims, a significant amount of grant funding
will be required and the approval of this lease will make that more likely. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility in line with the business plan. 
4.2. The lease will enable the facility to continue to operate the facility and continue to
remove liability for the Council in grounds maintenance.  In addition, the lease will
allow the Club to pursue external funding for the development of the facility. 
90

Page 91

4.3. The Council has no alternative operational requirement for the subjects and the
planning zoning, site location and lease use clause would safeguard the value in terms
of any alternative proposal. The risks of the transfer are considered low, however,
should the lease prove unsustainable for the Club, the Council will have the ability to
resume full ownership and consider the future of the property. 
5. Proposal
5.1. It is proposed to lease Hollandbush Golf Course and Club, New Trows Road,
Lesmagow ML11 0JS to Hollandbush Golf Club, on the following principal terms and
conditions:- 
1. the lease will be to Hollandbush Golf Club
2. the lease will be for a period of 25 years
3. the date of entry to be agreed
4. the rental shall be £1
5. the lease to be fully repairing and insuring
6. the tenants will pay the buildings insurance costs as charged by the Council
7. the tenants will be required to obtain and exhibit as required public liability
insurance to the value of £5 million for any one claim
8. the property will be used as a Golf club
9. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
10. assignation and subletting will not be allowed
11. landlord's consent will be required for any structural alterations to the property
12. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
6. Employee Implications
6.1. There are 6 members of staff (2 SLLC and 2 Council), who would be eligible for TUPE
transfer to the Golf Club.  However, discussions have been undertaken and the staff
affected by the proposed transfer have indicated that they would seek to remain to be
employed by the SLLC and SLC.  Both organisations have capacity with existing
vacancies to accommodate this. 
6.2. The Clubs Business plan and financial projections include staff salaries for both the
administration of the Club and course maintenance. 
7. Financial Implications
7.1. The lease will result in a saving in grounds maintenance and operational running costs. 
7.2. If the existing employees opt to exercise their right to TUPE transfer, the salaries (and
conditions) would require to be met in the business plan for the golf club. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council have until
6 March 2025 to make a decision, and the recommendation of the CAT Assessment
Panel will be presented to the meeting of the Housing and Technical Committee on 26
February 2025. 
91

Page 92

9.2.    The organisation has a right to appeal to Scottish Ministers should a decision not be
made within this timescale, if the asset transfer request is refused or the organisation
do not agree with the proposed terms and conditions. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities 
Previous References
♦ None 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/24/0008 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Jardine, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk
92

Page 93

Appendix 1 
12
93

Page 94

94

Page 95

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Dunedin Pitches and Pavilion, East Kilbride –
Community Asset Transfer to EKRFC Dunedin Project
Limited 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for a lease of Dunedin Pitches and Pavilion,
by EKRFC Dunedin Project Limited and seek approval to the principal terms and
conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at Dunedin Pitches and Pavilion, Dunedin Drive, East Kilbride,
G75 8QQ be leased to EKRFC Dunedin Project Limited, subject to the terms and
conditions outlined in Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at Dunedin Pitches and Pavilion were previously managed by South
Lanarkshire Leisure and Culture (SLLC), however, have been dormant for a number
of years and SLLC Board have confirmed that they are happy to transfer this site under
Community Asset transfer and are supportive of the objectives. 
3.2. EKRFC Dunedin Project Ltd wish to operate the facility for youth rugby in East
Kilbride and this is in addition to their existing offering at Calderglen Park, which no
longer has the capacity to deal with demand. The Club are particularly interested in
the development of youth, female and disabled rugby and see the Dunedin site as a
key part of this plan. 
3.3. The group submitted a request for Community Asset Transfer (CAT) of the Dunedin
Pitches and Pavilion, the validation date for which was 16 August 2024.  A public
consultation ran from 16 August until 13 September 2024, during which time no
comments were received 
3.4. The request was placed before the Community Asset Transfer Assessment Panel on
20 January 2025 when the following matters were taken into consideration. 
13
95

Page 96

3.5. Property
3.5.1. The extent of the property is shown on the attached plan and comprises a single storey
pavilion, associated parking and 2 full size grassed pitches. The pavilion is in a poor
to moderate state of repair. 
3.5.2. The existing premises at Dunedin pitches, are classified as Class 11: assembly and
leisure (a gymnasium or area for other indoor or outdoor sports or recreation) under
the Town and Country Planning (Use Classes) (Scotland) Order 1997 as amended.
As there is no proposed change of use or development, planning consent will not be
required. 
3.6. Organisation
3.6.1. EKRFC Dunedin Project Ltd is a private company, limited by guarantee (registered
number 810655) having registered this entity with Companies House on the 15 May
2024. 
3.6.2. This organisation has been established as a constituted vehicle to drive forward the
ambitions of the applicant to develop more rugby activity in the East Kilbride area
and cater for the demand which exists. The existing EKRFC already operate a
successful operation at Calderglen Country Park in East Kilbride. 
3.7. Project
3.7.1. The proposal is for EKRFC Dunedin Project Ltd to use the facility for the furtherance
of rugby within the East Kilbride Community and enable the club to see through its
plans for increased youth participation, female involvement and additional resource
for rugby for the disabled in conjunction with EK Disabled sports group. 
3.7.2 EKRFC Dunedin Project Ltd has worked closely with the existing Friends of Dunedin
group who have led community involvement on the site for a number of years.  Friends
of Dunedin are supportive of the application and recognise the benefits it will bring to
users and local residents and the group will continue to work alongside Friends of
Dunedin and support their projects in tandem. 
3.7.3. The organisation is newly established for the purpose of the CAT and there is no
tangible information to confirm the financial viability.  However, it has a number of
trustees who have been involved in the successful operation of EKRFC for some time
and bring a range of skills and knowledge that should provide a firm base for future
development. 
4. Assessment
4.1. The property is suitable for the proposed use and through its affiliation with East
Kilbride RFC the organisation has the capacity and funds to manage the facility.  The
group propose to utilise existing club funds for initial outlay and a portion of the
membership income on an ongoing basis to cover ongoing costs. 
4.2. The lease will enable the facility to re-open and relieve the Council of empty property
costs and site maintenance, currently undertaken by Grounds Services.  The club
would be expected to take on the property in its current condition and take
responsibility for any costs of recommissioning.   
4.3. The Council has no alternative operational requirement for the subjects and the
planning zoning, site configuration and lease use clause would safeguard the value in
terms of any alternative proposal. The risks of the transfer are considered low,
however, should the lease prove unsustainable for EKRFC Dunedin Project Ltd, the
96

Page 97

Council will have the ability to resume full ownership and consider the future of the
property. 
4.4 A community benefit assessment was carried out by the community asset transfer
working group which gave a score of 100%, indicating that the community benefit was
deemed excellent. 
5. Proposal
5.1. It is proposed to lease Dunedin Pitches and Pavilion to EKRFC Dunedin Project
Limited, on the following principal terms and conditions:- 
1. the lease will be to the EKRFC Dunedin Project Limited
2. the lease will be for a period of 50 years, with agreed break options
3. the date of entry to be agreed
4. the rental shall be £1
5. the lease to be fully repairing and insuring
6. the tenants will pay the buildings insurance costs as charged by the Council.
7. the tenants will be required to obtain and exhibit as required public liability
insurance to the value of £5 million for any one claim
8. the property will be used as a sports pavilion and pitches
9. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
10. assignation and subletting will not be allowed
11. landlord's consent will be required for any structural alterations to the property.
12. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates, insurance
and utility standing charges and repairs and maintenance. In addition, it will enable a
saving in grounds maintenance costs for South Lanarkshire Council. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council initially
had until 16 February 2025 to make a decision. 
9.2.    The organisation had a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request was refused or the organisation
did not agree with the proposed terms and conditions. However, the group have
agreed to a request to extend the deadline until 26 February 2025 to allow the matter
to be considered at the Housing and Technical Resource Committee meeting. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
97

Page 98

10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities. 
Previous References
♦ None 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/24/0008 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Jardine, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk
98

Page 99

Appendix 1 
13
99

Page 100

100

Page 101

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Raploch Pitches and Pavilion, Larkhall – Community
Asset Transfer to Larkhall Thistle Community Football
Club 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for a lease of Raploch Pitches and Pavilion,
by Larkhall Thistle Community Football Club and seek approval to the principal
terms and conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at Raploch Pitches and Pavilion, Burnbrae Road, Larkhall, ML9
1AL be leased to Larkhall Thistle Community Football Club, subject to the terms
and conditions outlined in Section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at Raploch Pitches and Pavilion were previously managed by South
Lanarkshire Leisure and Culture (SLLC). However, SLLC created a sub-lease with
the Larkhall Thistle Community Football Club, allowing them to maintain the pitches
and site themselves. This arrangement was reached following a proposal by SLLC to
close the changing pavilion due to it being at end of life and the club wishing to
continue themselves to keep the pavilion functional.  This arrangement has been
harmonious and SLLC are fully supportive of the proposed transfer and the
organisation’s capacity. 
3.2. Larkhall Thistle Community Football Club wish to continue to operate the facility to
develop youth football and promote advancement of public participation in football
through the provision of mainstream non-competitive and competitive youth football. 
3.3. The Club submitted a request for Community Asset Transfer (CAT) of Raploch
Pitches and Pavilion, the validation date for which was 15 July 2024. A Public
consultation ran from 15 July until 13 August 2024.  One comment was received
during this period which was designated as being neutral.  It supported the groups
aspiration but raised some concern about parking during periods of high demand. 
14
101

Page 102

3.4. The request was placed before the CAT Assessment Panel on 20 January 2025
when the following matters were taken into consideration. 
3.5. Property
3.5.1. The extent of the property is shown on Appendix 1 to the report and comprises of a
stone changing pavilion, pre-fabricated toilet block, two 11 a side pitches and one 7 a
side pitch.  The buildings are in a poor state of repair, while the pitches are maintained
to a high standard. 
3.5.2.  As there is no proposed change of use or development, planning consent will not be
required for continued use.  Relevant warrants and consent will need sought as and
when the Club proposes to rebuild the pavilion. 
3.6. Organisation
3.6.1. Larkhall Thistle Community Football Club is a 2 tier Scottish Charitable Incorporated
Organisation (SCIO), registered number SC052983, having registered this entity with
the Scottish Charity Regulator (OSCR), on 5 December 2023. 
3.6.2. The organisation has been established as a constituted vehicle to drive forward the
ambitions of the applicant to redevelop the site.  Prior to becoming a SCIO, Larkhall
Thistle FC operated under a community football constitution for over 25 years. 
3.7. Project
3.7.1. The proposal is for Larkhall Thistle Community Football Club to continue to manage
the facility as a going concern for the development of youth football and incrementally
invest in the facility to redevelop the pavilion, introduce an artificial pitch and improve
parking and security. 
3.7.2. The Council have let a small area of land within the curtilage of the site to Larkhall
Men’s Shed.  This was done in conjunction with the applicant who recognises the
benefit of serving the wider community and the Club propose to collaborate with
them to maximise the use of resources, experience and networking. 
3.7.3. The organisation is newly established for purpose, however, accounts for previous
entity show a positive bank balance.  It incurred a loss of £6223.23 during the last
financial year due to renewing equipment, new leases on grounds equipment and
consultancy and professional advice, in relation to this project.  The club normally
makes a small amount of profit which is generally carried forward. 
3.7.4. The applicant has produced a business plan, which recognises local priorities and
confirmation of need.  To achieve their end aims, a significant amount of grant
funding will be required, the approval of this longer lease will make that possible. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.2. The lease will enable the Club to continue to operate the facility and continue to
remove liability for the Council in property costs and grounds maintenance.  In
addition, the lease will allow the Club to pursue external funding for the development
of the facility.  
102

Page 103

4.3. The Council has no alternative operational requirement for the subjects and the
planning zoning, restricted vehicular access, site configuration and lease use clause
would safeguard the value in terms of any alternative proposal.  The risks of the
transfer are considered low, however, should the lease prove unsustainable for
Larkhall Thistle Community Football Club, the Council will have the ability to resume
full ownership and consider the future of the property. 
4.4. A community benefit assessment was carried out by the CAT working group which
gave a score of 90%, indicating that the community benefit was deemed excellent. 
5. Proposal
5.1. It is proposed to lease Raploch Pitches and Pavilion, Burnbrae Road, Larkhall to
Larkhall Thistle Community Football Club, on the following principal terms and
conditions:- 
 the lease will be to the Larkhall Thistle Community Football Club
 the lease will be for a period of 25 years with agreed break options
 the date of entry to be agreed
 the rental shall be £1
 the lease to be fully repairing and insuring
 the tenants will pay the buildings insurance costs as charged by the Council
 the tenants will be required to obtain and exhibit as required public liability
insurance to the value of £5 million for any one claim
 the property will be used as a sports pavilion and pitches
 the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
 assignation and subletting will not be allowed
 landlord's consent will be required for any structural alterations to the property.
 each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates, insurance
and utility standing charges and repairs and maintenance. In addition, it will enable a
saving in grounds maintenance costs for South Lanarkshire Council. 
7.2.    The property has an estimated capital receipt value in the order of £40,000 - £50,000. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council initially
had until 16 January 2025 to make a decision.  However, the group have agreed to a
request to extend the deadline until 26 February 2025 to allow the matter to be
considered at the Housing and Technical Resource Committee meeting.  
103

Page 104

9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request is refused or the organisation do
not agree with the proposed terms and conditions. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities. 
Previous References
♦ None 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/24/0008 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Jardine, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk
104

Page 105

Appendix 1 
14
105

Page 106

106

Page 107

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Eastfield Community Hall, Cambuslang – Community
Asset Transfer to Eastfield Community Centre
Management Committee 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for the disposal of Eastfield Community Hall
to Eastfield Community Centre Management Committee under Community Asset
Transfer (CAT) and seek approval to the principal terms and conditions as set out
in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at Eastfield Community Hall, Dukes Road, Cambuslang, G72
7BA, be disposed to Eastfield Community Centre Management Committee
subject to the terms and conditions outlined in Section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the disposal and enter into the necessary legal
agreements on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. Eastfield Community Hall was previously managed by South Lanarkshire Leisure
and Culture (SLLC). However, following a review of its business plan, the SLLC
Board announced in March 2024 that it could not sustain service delivery from this
facility and control was to be returned to the Council.  However, the property
remained operational, funded by the community fightback fund whilst negotiations
took place with the management committee regarding their intentions for the future. 
3.2. On 27 March 2024, the Executive Director (Housing and Technical Resources) had
obtained Committee approval for Temporary Delegated Authority to enter annual
arrangements with community organisations to take over the management of
facilities affected by budget decisions.  A request for a 1-year concessionary lease
was approved by Delegated Powers on 23 August 2024, which resulted in the
management committee taking over day-to day responsibility for this facility pending
the submission of a full CAT application. 
3.3. The Committee submitted a request for CAT of the hall by sale, the validation date
for which was 16 August 2024.  Public consultation was undertaken between 16
August and 13 September 2024 and no comments or objections were received. 
15
107

Page 108

3.4. The request was placed before the CAT Assessment Panel on 20 January 2025
when the following matters were taken into consideration. 
3.5. Property
3.5.1. The extent of the property is shown in Appendix 1 to the report and comprises of a
single storey steel framed community centre with facing brick outer walls and a pitched
tiled roof.  Pedestrian access from Dukes Road to the main entrance is via a paved
ramp with metal handrails.  There is a tarmac surfaced walkway around the building
and an external garage/store and a tarmac surfaced car park. 
3.5.2. The remainder of the site, which extends to 2,030 square metres (sq m),  or thereby,
comprises of maintained grassed open space/landscaping and the site is bounded
by metal fencing.  The building and grounds are in a well-maintained condition and
do not require any work of significance to continue to operate. 
3.5.3.  The property is currently used by the applicant as a community facility for the local
community and as there is no proposed change of use or development, planning
consent will not be required for continued use. 
3.6. Organisation
3.6.1. The organisation is a 2-tier Scottish Charitable Incorporated Organisation (SCIO)
registered number SC053182, having registered this entity with the Scottish Charity 
Regulator (OSCR) on 12 March 2024. 
3.6.2. This organisation has been established as a constituted vehicle to continue
operating the hall as a community centre.  Historically this facility was community
managed with support from South Lanarkshire Leisure and Culture who are
supportive of the organisation and believe it has the capacity to continue to operate
the facility successfully. 
3.7. Project
3.7.1. Having successfully operated the facility on an interim basis during the
concessionary lease, the proposal is for the Committee to continue to occupy, use
and maintain the building in long-term. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.2. The disposal will enable the Management Committee to continue to operate the facility
and remove liability for the Council in grounds maintenance.  In addition, the sale will
allow the Club to pursue external funding for the development of the facility. 
4.3. The Council has no alternative operational requirement for the subjects.  The risks of
the transfer are considered low, as the property is a purpose-built community centre
classified as class 10: non-residential institution under the Town and Country Planning
(Use Classes) (Scotland) Order and surrounded by land, owned by the Council and
zoned as Priority Greenspace and Urban Green network. Therefore, it is not
considered that the property has any realistic alternative development potential. 
4.4. Within their asset transfer request, Eastfield Community Centre Management
Committee requested a 100% discount on the jointly agreed, independent valuation.
As the price to be paid reflects the Community Benefit, which has been assessed as
very good, and the requirement to seek Best Value in the disposal of a Council
108

Page 109

asset, a discount of 80% of the unrestricted market value is recommended. This is a
consistent approach adopted in previous sales transactions for properties of a similar
nature and reflects the Best Value assessment. 
4.5. An independent valuation was prepared by the District Valuer (Valuation Office
Agency) which reported:- 
 market value – unrestricted use: the opinion of the market value of the Council’s
interest in the property, with vacant possession with regard to the continued use
of the building on an unrestricted basis and with regard to potential
redevelopment for residential use, is £115,000 (One Hundred and Fifteen
Thousand Pounds) as at 1 August 2024
 market value - restricted use: The opinion of the market value of the Council’s
interest in the property, with vacant possession subject to the special
assumption that its use is restricted to a Community Centre is £80,000 (Eighty
Thousand Pounds) as at 1 August 2024 
5. Proposal
5.1. It is proposed to sell Eastfield Community Hall, Dukes Road, Cambuslang, G72 7BA
to Eastfield Community Centre Management Committee, on the following principal
terms and conditions:- 
 the purchaser will be to Eastfield Community Centre Management Committee
 the purchase price is £23,000 exclusive of VAT which reflects 80% discount
 date of Entry to be agreed
 each party to bear their own Legal Fees
 the purchaser will be responsible for obtaining planning and any other relevant
consents relating to the use and any proposed alterations 
6. Employee Implications
6.1. None 
7. Financial Implications
7.1. If the sale outlined in this report is approved by committee, it will remove the costs of
operating this asset from the limited-period Community Fightback Fund and
Renewable Energy that were established by the Council in 2024. 
7.2. The sale of the property will generate a Capital Receipt of £23,000 for the Council’s
General Services Account. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until
16 February 2025 to make a decision.  The group have agreed to a request to
extend the deadline to allow the matter to be considered at the Housing and
Technical Resource Committee meeting. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request is refused or the organisation do
not agree with the proposed terms and conditions.  
109

Page 110

10. Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities. 
Previous References
♦ None 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/24/0008 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Jardine, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk
110

Page 111

Appendix 1  
15
111

Page 112

112

Page 113

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 26 February 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Delegated Authority Report – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise on transactions processed by delegated authority by Property Services
during Quarter 3 of 2024/2025
[1purpose]
2. Recommendation(s)
2.1. The Housing and Technical Resources Committee is asked to approve the following
recommendation(s):- 
(1) that the transactions processed by delegated authority by Property Services
during Quarter 3 of 2024/2025 be noted. 
3. Background
3.1. The Executive Director (Housing and Technical Resources) has delegated authority
to deal with various transactions, including:- 
♦ leases of a value up to £50,000 per annum and a maximum period of 20 years
♦ rent reviews up to an increase of £20,000 per annum
♦ disposals up to a value of £200,000
♦ acquisitions up to a value of £200,000 
3.2. Delegated authority reports are prepared by case officers and submitted to the Head
of Property Services for approval, once provisional agreement has been reached
with the third party.  A weekly list of approved reports is published on the Council’s
intranet under “Estates Property Transactions”. 
3.3. The delegated reports provide authority for officers to progress transactions and,
where appropriate, to instruct Legal Services.  The receipt of any monies arising
from the transactions occurs at a date in the future, once missives have been
concluded and any suspensive conditions met.  It should be noted that some
transactions may never settle. 
4.  Summary Quarter 3, 2024/2025
4.1. The summary of transactions progressed under delegated authority during Quarter 3
of 2024/2025 is shown in Appendix 1 to the report, column 2, however, can be
summarised as follows:-  
16
113

Page 114

Total number of transactions  75 
Total value of lease transactions   £59,300 per annum 
Total value of capital transactions   £4,499,971.25 
Total number of miscellaneous transactions 5 
4.2.  The overall profile of the volume and value of transactions during 2024/2025
generally compares with previous years.   
5. Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. The rental income to the Council is increased as a result of the new lettings and
lease renewals.   
6.2. Disposals generate additional capital monies for the Council’s Capital Programme. 
6.3. Acquisitions are carried out in accordance with project plans and approved capital
budgets, to enable investment programmes to proceed. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no issues in relation to climate change, sustainability and environment
contained within this report. 
8. Other Implications
8.1. There is a low risk that the rental and capital receipts identified within these
delegated authority reports are not achieved if, for reasons out with the Council’s
control, the tenant/ purchaser chooses not to proceed with the transactions. 
However, Property Services has in place procedures and consultations intended to
minimise this risk. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. Consultation takes place with the occupying Resource, Planning, Roads and Legal
Services, on a transaction by transaction basis as and when required. 
9.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
14 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 27 November 2024
 Housing and Technical Resources Committee, 18 September 2024  
114

Page 115

List of Background Papers
 Plans and drawings of the property involved in these transactions can be obtained from
the Assets and Estates Team, Property Services
 Weekly List of Delegated Authority Transactions can be obtained on the Council’s
intranet 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Craig Jardine, Head of Property Services
Ext: 4073 (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk 
115

Page 116

Appendix 1 
Delegated Authority Transactions 
Transaction Type  Quarter 3
2024/2025 
No Value   
Lease Renewal 0 £0   
New Lease/ Licence 
Landlords Consent
11 
2
£59,300 
£0   
Assignation 7 £0   
Rent Review 0 £0   
Total Revenue  20  £59,300   
Disposal 1 £0   
Compensation 7 £31,871.25   
Wayleave/Servitude 0    £0   
Acquisition 
Title Waiver
42 
0
£4,468,100 
£0   
Total Capital  50  £4,499,971.25   
Miscellaneous 5 £14 
116