Democracy Spraffa

Agenda Document Pack - Housing and Technical Resources Committee - 24/04/2024

South Lanarkshire Council · 24 April 2024
Back to Housing and Technical Resources Committee — 24 April 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 16 April 2024 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 24 April 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Davie McLachlan (Chair), Margaret Cowie (Depute Chair), Joe Fagan (ex officio), Walter
Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry Convery, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer, Grant Ferguson,
Alistair Fulton, Ross Gowland, Geri Gray, Ross Lambie, Richard Lockhart, Julia Marrs, Ian
McAllan, Kenny McCreary, Norman Rae, David Shearer, Kirsty Williams 
Substitutes
John Bradley, Robert Brown, Poppy Corbett, Gladys Ferguson-Miller, Martin Hose, Cal
Johnston-Dempsey, Susan Kerr, Eileen Logan, Monique McAdams, Richard Nelson, Helen
Toner, Margaret B Walker, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources Committee
held on 7 February 2024 submitted for approval as a correct record. (Copy
attached) 
5 - 20 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 27 March 2024 by the Executive Director (Housing
and Technical Resources) and Executive Director (Finance and Corporate
Resources). (Copy attached) 
21 - 26 
4 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources
- Housing Revenue Account (HRA)
Joint report dated 27 March 2024 by the Executive Director (Housing
and Technical Resources) and Executive Director (Finance and Corporate
Resources). (Copy attached) 
27 - 30 
5 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources
(excl Housing Revenue Account (HRA))
Joint report dated 3 April 2024 by the Executive Director (Housing and Technical
Resources) and Executive Director (Finance and Corporate Resources). (Copy
attached) 
31 - 34 
6 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account)
Joint report dated 27 March 2024 by the Executive Director (Housing
and Technical Resources) and Executive Director (Finance and Corporate
Resources). (Copy attached) 
35 - 38 
7 Housing and Technical Resources – Workforce Monitoring – December
2023 to February 2024
Joint report dated 13 March 2024 by the Executive Director (Housing
and Technical Resources) and Executive Director (Finance and Corporate
Resources). (Copy attached) 
39 - 46 
Item(s) for Decision 
8 Proposed Partnership with Social Bite
Report dated 8 March 2024 by the Executive Director (Housing and Technical
Resources). (Copy attached) 
47 - 56 
9 Low Waters Hall, Hamilton – Community Asset Transfer to Low Waters
Community Group
Report dated 5 March 2024 by the Executive Director (Housing and Technical
Resources.  (Copy attached) 
57 - 62
2

Page 3

10  Former Walston Primary School, Elsrickle – Asset Transfer to Biggar and
District Men’s Shed
Report dated 11 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
63 - 68 
11  Community Asset Transfer of 33 Smyllum Road, Lanark – 5 year Lease to
Healthy Valleys
Report dated 13 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
69 - 72 
12  Community Asset Transfer of Former St Leonard's Hall East Kilbride to
East Kilbride Men's Shed - 15 Year Lease
Report dated 13 March 2024 by the Executive Director (Housing and Technical
Resources). (Copy attached) 
73 - 78 
13  Tom Craig Centre, 3 Lawhill Road, Law – Lease to Law Boxing Club
Limited
Report dated 13 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
79 - 82 
14  Bothwell Community Hall, 8 Fallside Road, Bothwell - Lease to Bothwell
Futures
Report dated 13 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
83 - 86 
Item(s) for Noting 
15  Refugee Resettlement Programme Review
Report dated 21 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
87 - 90 
16  Scottish Government Consultations on the Social Housing Net Zero
Standard in Scotland and Heat in Buildings Bill
Report dated 18 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
91 - 96 
17  Notification of Contracts Awarded - 9 September 2023 – 29 February 2024
Report dated 8 March 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
97 - 106 
Urgent Business 
18  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 7 February 2024 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor
Janine Calikes, Councillor Gerry Convery, Councillor Andrea Cowan, Councillor Margaret Cowie
(Depute), Councillor Maureen Devlin, Councillor Colin Dewar, Councillor Allan Falconer, Councillor
Grant Ferguson, Councillor Gladys Ferguson-Miller (substitute for Councillor Geri Gray), Councillor
Alistair Fulton, Councillor Ross Gowland, Councillor Cal Johnston-Dempsey (substitute for
Councillor Ian McAllan), Councillor Ross Lambie, Councillor Richard Lockhart, Councillor Julia
Marrs, Councillor Kenny McCreary, Councillor Norman Rae, Councillor David Shearer, Councillor
Kirsty Williams 
Councillors' Apologies:
Councillor Margaret Cooper, Councillor Joe Fagan (ex officio), Councillor Geri Gray, Councillor Ian
McAllan 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Resources); H Calley, Administration Officer; E Maxwell, HR Business
Manager; L O’Hagan, Finance Manager (Strategy); M M Wilson, Legal Services Manager; L Wyllie,
Administration Assistant
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services; J Forbes, Head of Property
Services; G McParland, Property Manager (Assets and Estates); C Mitchell, Strategy and Support
Manager 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s) Item(s) Nature of Interest(s)
Lockhart 
Marrs
Lease of Proposed Development – Lanark
Community Workshop at Lanark
Racecourse 
Lease of Proposed Development – Lanark
Community Workshop at Lanark
Racecourse
Member of groups who have
an involvement and interest in
developing the assets of
Lanark Racecourse 
Personal connection to
members of Lanimer
Committee 
2 Minutes of Previous Meeting
The minutes of the meeting of the Housing and Technical Resources Committee held on 8
November 2023 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
2
5

Page 6

3 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 10 January 2024 by the Head of Finance (Strategy) and the Executive
Director (Housing and Technical Resources) was submitted advising of the actual expenditure
measured against the revenue budget for the period 1 April to 1 December 2023 for Housing
and Technical Resources (excl HRA). 
As at 1 December 2023, there was a breakeven position against the phased budget, as detailed
in Appendix A to the report.  Following the probable outturn exercise, the forecast to 31 March
2024 was a breakeven position, after approved transfers to reserves. 
Virements were proposed to realign budgets and those were detailed in appendices B and C to
the report. 
The Committee decided: 
(1) that the breakeven position as at 1 December 2023 on Housing and Technical Resources’
(excl HRA) revenue budget, as detailed in Appendix A to the report, be noted; 
(2) that the forecast to 31 March 2024 of a breakeven position, after approved transfers to
reserves, be noted; and 
(3) that the proposed budget virements be approved. 
[Reference: Minutes of 8 November 2023 (Paragraph 3) and Minutes of the Executive
Committee of 24 January 2024 (Paragraph 3)] 
4 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 10 January 2024 by the Head of Finance (Strategy) and the Executive
Director (Housing and Technical Resources) was submitted advising of the actual expenditure
measured against the revenue budget for the period 1 April to 1 December 2023 for Housing
and Technical Resources (HRA). 
As at 1 December 2023, there was a breakeven position against the phased budget, as detailed
in Appendix A to the report.  Following the probable outturn exercise, the forecast to 31 March
2024 was a breakeven position.  This breakeven position included a lower than anticipated
transfer from reserves. 
The Committee decided: 
(1) that the breakeven position on Housing and Technical Resources’ (HRA) revenue budget,
as detailed in Appendix A to the report, and the forecast to 31 March 2024 of a breakeven
position, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 8 November 2023 (Paragraph 4) and Minutes of the Executive
Committee of 24 January 2024 (Paragraph 3)] 
6

Page 7

5 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 17 January 2024 by the Head of Finance (Strategy) and the Executive
Director (Housing and Technical Resources) was submitted advising of progress on the capital
programme for Housing and Technical Resources (excl HRA) for the period 1 April to 1
December 2023. 
The revised budget for Housing and Technical Resources was £11.488 million.  On 22
November 2023 and 24 January 2024, the Executive Committee agreed changes to the
Programme totalling a net decrease of £0.770 million, as detailed in Appendix A to the report. 
Anticipated spend to date was £2.238 million and spend to 1 December 2023 amounted to
£1.988 million.  This represented an underspend of £0.250 million which was due to the timing
of project spend on the demand-led Prioritised Urgent Investment Programme being less than
anticipated. 
The projected outturn for 2023/2024 was £8.800 million, an underspend of £2.688 million.  This
was mainly due to the anticipated timing of spend on a number of multi-year projects. 
The Committee decided: 
(1) that the Housing and Technical Resources’ (excl HRA) capital programme of £11.488
million and expenditure to date of £1.988 million be noted; and 
(2) that the projected outturn of £8.800 million be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 5) and Minutes of the Executive
Committee of 22 November 2023 (Paragraph 4) and 24 January 2024 (Paragraph
4)] 
6 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 10 January 2024 by the Head of Finance (Strategy) and the Executive
Director (Housing and Technical Resources) was submitted advising of progress on the capital
programme for Housing and Technical Resources (HRA) for the period 1 April to 1 December
2023. 
The budget was based on the revised capital programme for the year which had been approved
by the Executive Committee on 24 January 2024. 
The Housing capital programme for 2023/2024 totalled £67.443 million and was detailed, along
with the funding sources, in Appendix A to the report. 
Actual expenditure to 1 December 2023 was £33.973 million.  This was £0.658 million ahead of
programme and was due to the number of buy backs through the open market purchase
scheme being ahead of programme. 
Current estimates suggested an outturn of £67.443 million.  The Resource was expected to
spend to this level and work would continue in the coming months to deliver spend.
7

Page 8

The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £67.443 million and expenditure to 1
December 2023 of £33.973 million be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 6) and Minutes of the Executive
Committee of 24 January 2024 (Paragraph 4)] 
7 Housing and Technical Resources – Workforce Monitoring – September to
November 2023
A joint report dated 21 December 2023 by the Head of Finance (Strategy) and the Executive
Director (Housing and Technical Resources) was submitted on the following employee
information for Housing and Technical Resources for September to November 2023:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 9 September 2023 
The Committee decided: that the report be noted. 
[Reference: Minutes of 8 November 2023 (Paragraph 7)] 
8 Housing Revenue and Capital Account Budget 2024/2025
A joint report dated 12 January 2024 by the Chief Executive and the Executive Director
(Housing and Technical Resources) was submitted on:- 
 the revenue estimate proposals for the Housing Revenue Account (HRA) for 2024/2025
which had been prepared in line with the 30-year Business Plan
 the 2024/2025 Housing Capital Programme totalling £77.303 million 
The HRA revenue budget for 2024/2025 had been prepared in line with the 30-year HRA
Business Plan, developed to reflect the investment priority to maintain and improve the housing
stock to meet national housing quality and energy efficiency standards.  The programme also
included projects to increase the supply of Council housing as well as environmental works and
legislative compliance programmes, to ensure that all safety requirement standards were met. 
The movement from the original 2023/2024 revenue budget was summarised in the report and
outlined in Appendix 1 to the report. 
The 2024/2025 budget proposal also included a provision of £3.743 million for bad debt which
would be required to continue to provide for the potential impact on rent collection and arrears. 
This included contingency for the ongoing uncertainty on rental collections in the coming year
due to cost-of-living pressures and an allocation of £0.300 million for tenancy sustainment
mitigation.
8

Page 9

During previous budget engagement, tenants had favoured multi-year agreements on the basis
that they would have some clarity regarding rent levels in the medium term.  A rent increase of
6.50% was proposed from 2024/2025 with a further 6.50% increase in 2025/2026 and again in
2026/2027.  In accordance with statutory requirements, this 3-year commitment would be
subject to annual review and customer engagement.  This approach would allow the Council
and tenants to plan and budget on a longer-term basis.  To achieve this level of rent increase, a
re-profiling of the long-term investment priorities had been undertaken.  Short-term investment
priorities and current service levels would be maintained. 
A recently published Scottish Government draft budget for 2024/2025 included the reduction in
funding available for the Affordable Housing Supply Programme.  The 2024/2025 budget
represented a decrease of 22% on the previous published figure for 2024/2025 and it was still
unclear how the Scottish Government would reduce individual Councils’ funding.  Further
discussions were planned with the More Homes Team at the Scottish Government for further
clarity on the situation.  Any reduction in Scottish Government grant available for the Council
could impact the planned investment to increase the overall supply of Council housing.  An
update would be provided to the Committee when information on the impact for the Council,
which might affect the 2024/2025 and future years capital programmes, was available. 
Based on the latest Scottish Social Housing Charter returns, the average rent charges for South
Lanarkshire Council tenants remained affordable and were currently the seventh lowest of local
authority landlords in Scotland.  In addition, South Lanarkshire Council tenants’ rent charges
were the lowest of all the social landlords operating in South Lanarkshire. 
In line with the HRA Business Plan, a reduction of £0.300 million for efficiencies had been
included within the Resource’s Supervision and Management and Other Income budgets. 
£0.100 million of the efficiencies did not affect the delivery of services to tenants and related to
the removal of vacant posts from the current establishment.  The remaining £0.200 million was
anticipated to come from standardising charges for washing and drying facilities across all
Council areas which had been approved by this Committee on 8 November 2023. 
At the Executive Committee on 24 June 2020, the Council approved the implementation of the
findings from the Loans Fund Review which included work by Link Asset Services to analyse the
impact on the HRA loans fund principal repayments if a Loans Fund Review for the HRA was
implemented.  This work was refreshed at the end of March 2023 and further details of the
Loans Fund Review were provided in the report.  Implementing the Loans Fund Review meant
looking at the repayment terms of loans and the lifespan of the related assets. 
As at 31 March 2023, outstanding Loans Fund Advances for the HRA totalled £292.694 million. 
However, by applying the Loans Fund Review, the Loans Fund Advances as at 31 March 2023
would have been £407.126 million, which meant that the accounting for repaying debt resulted
in an overpayment of £114.432 million.  This was referred to as a recalculation adjustment which
was detailed in table 1 of the report. 
It was proposed that the recalculation adjustment be applied over the financial years 2023/2024
to 2025/2026 to reduce the HRA repayments in those years by £22.000 million, compared to
current repayment profile. 
How the benefits of the Loans Fund Review would be utilised were detailed in the report as well
as information on additional debt repayments. 
Details of the proposed Housing Capital Programme, totalling £77.303 million, were provided in
Appendix 3 to the report and information on how the Programme would be funded was
summarised in the report. 
9

Page 10

The Budget Scrutiny Group (BSG) provided the main consultation process between the Council
and tenant representatives.  Each year, the Council and the BSG worked together to develop
and co-ordinate the consultation programme on setting Council rent levels for the year ahead. 
This year’s consultation programme followed a similar approach to previous years and included
the Tenant Participation Co-ordination Group (TPCG).  A summary of the feedback received
from the BSG and TPCG was detailed in the report as well as feedback received from various
engagement events and an online survey. 
Officers responded to members’ questions on various aspects of the report. 
The Committee recommended to the Executive Committee: 
(1) that the rent increase of 6.50% to be applied in 2024/2025 with a further 6.50% increase in
2025/2026 and again in 2026/2027 subject to annual review and customer engagement for
all Council houses, Gypsy/Traveller sites, lockups and garage sites and the revenue
estimate proposals for the HRA, as detailed in Appendix 1 to the report, be endorsed; 
(2) that the findings of the HRA Loans Fund Review, as detailed in Section 4 of the report, be
endorsed for implementation; and 
(3) that based on the rent increase of 6.50%, the 2024/2025 Housing Capital Programme of
£77.303 million, as detailed in Appendix 2 to the report, be endorsed. 
[Reference: Minutes of 23 January 2023 (Paragraph 2) and Minutes of the Executive
Committee of 24 June 2020 (Paragraph 12)] 
9 Housing Allocation Policy – Local Letting Plans 2024/2025
A report dated 11 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted advising on progress against the 2023/2024 letting targets and requesting
approval for:- 
 the 2024/2025 letting targets
 the 2024/2025 Local Letting Initiatives (LLIs) 
Local Letting Plans (LLPs) were a key feature of the Housing Allocation Policy and continued to
ensure that a strategic and flexible approach was taken in the allocation of Council housing. 
Annually, LLPs were prepared for each housing management area and provided an overview of
local supply and demand setting out:- 
 annual letting targets for each of the 4 housing lists (in relation to mainstream and
sheltered properties)
 details of LLIs in operation within a local area 
LLPs and associated targets were subject to this Committee’s approval and this was the fourth
annual report since the revised Housing Allocation Policy had been introduced. 
Details of the projected outcomes in relation to the letting targets set for both mainstream and
sheltered properties in 2023/2024 were set out in appendices 1 and 2 to the report and factors,
which had been taken into account when setting the mainstream letting targets, were
summarised in the report. 
The Housing Allocation Policy allowed for the establishment of LLIs in areas where there were
particular needs, issues or circumstances which required to be addressed.  It was proposed that
the 6 LLIs set out in Appendix 3 of the report be retained during 2024/2025.  
10

Page 11

In the previous LLP report presented to this Committee on 15 March 2023, it had been
recoginised that there were benefits to supporting tenants living in larger homes to downsize to
a smaller property.  Consequently, it was agreed that during 2023/2024, a proactive approach
would be taken to support Council tenants under occupying larger sized properties to downsize
to a smaller property where they wished to do so. 
During 2023, a review of Council tenants living in 4-bedroom properties had been carried out. 
The key aim was to consider the tenants’ needs and application preferences, provide housing
options advice and, where appropriate, ensure applications had been placed appropriately on
the housing register to maximise tenants’ chances of being re-housed to a smaller property. 
A change in operational practice had also been introduced to ensure that when a Council tenant
living in either a 3 or 4-bedroom property submitted a new application for housing, specific
consideration was given to application preferences and housing options advice was provided to
enhance the tenant’s chance of being re-housed. 
As a result of the review exercise and through the mainstream allocation process, 19 tenants
had been rehoused in a smaller, more suitable property and 3 tenants had been made an offer
of housing.  In addition, through the right to mutual exhange, a further 20 tenants had also been
rehoused from a larger property to a smaller home. 
It was proposed that this approach would continue and be expanded to include a focus on
tenants living in 3-bedroom properties. 
The 2024/2025 LLPs would be published on the Council’s website. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that progress against the 2023/2024 letting targets be noted; 
(2) that the 2024/2025 mainstream housing letting targets, attached as Appendix 1 to the
report, be approved; 
(3) that the 2024/2025 sheltered housing letting targets, attached as Appendix 2 to the report,
be approved; and 
(4) that the Local Letting Initiatives, attached as Appendix 3 to the report, be approved. 
[Reference:  Minutes of 15 March 2023 (Paragraph 9)] 
10 South Lanarkshire Council Customer Involvement Strategy 2024 to 2029
A report dated 20 December 2023 by the Executive Director (Housing and Technical
Resources) was submitted requesting approval for the introduction of the revised Customer
Involvement Strategy with effect from 1 April 2024. 
This was the 5th Customer Involvement Strategy, a copy of which was attached as Appendix 1
to the report, and had been prepared and developed in accordance with the requirements of the
Housing (Scotland) Act 2001 and relevant legislation and regulatory requirements. 
On 14 December 2022, this Committee had approved the updated Policy and Strategy Review
Schedule which confirmed that a review of the Council’s Customer Involvement Strategy would
take place during 2023.
11

Page 12

The key aim of the Strategy was to ensure extensive engagement with tenants and other
customers to inform the important decisions taken across housing and related services.  The
Strategy had also been developed to reflect the principles of both the Community Empowerment
(Scotland) Act 2015 and the National Standards for Community Engagement. 
The actions taken during the pre-consultation stage to support the development of a consultative
draft were detailed in the report.  The comments received and views expressed during the pre-
consultation stage had also been used to inform the consultative draft Strategy. 
To ensure extensive engagement with customers to inform the important decisions taken across
housing services, the revised Strategy set out the approach the Council would take in customer
involvement.  This approach was in line with the Council’s values outlined in Connect 2022 to
2027. 
The consultative draft Strategy had been developed in conjunction with the Tenant Participation
Co-ordination Group (TPCG) and was issued for formal consultation from 1 September to 8
December 2023.  It had also been published on the Council’s website, together with an online
survey, which had been developed to guide responses in relation to key aspects of the Strategy. 
Further information on the formal consultation process was detailed in the report. 
Subject to approval, the revised Strategy would be implemented from 1 April 2024 and, in
conjunction with the TPCG, an annual report on progress would be provided to Committee. 
An officer responded to a member’s question in relation to using different methods of and
venues for engagement. 
The Committee decided: 
(1) that the revised South Lanarkshire Council Customer Involvement Strategy, attached as
Appendix 1 of the report, be approved; and 
(2) that the revised Strategy be implemented with effect from 1 April 2024. 
[Reference: Minutes of 14 December 2022 (Paragraph 10) and Minutes of 23 May 2018
(Paragraph 9)] 
11 Homelessness Pressures - Impact and Proposals
A report dated 5 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted:- 
 providing an update on the challenges resulting from unprecedented demand for statutory
homeless services, including temporary accommodation
 highlighting the actions being progressed and proposed in mitigation 
Local authorities had a range of legal duties in responding to homelessness which included
securing settled housing.  Locally, the Council and its partners had a strong record of effective
delivery of homeless services.  The commitment to preventing and alleviating homelessness
had been a continuing strategic focus for over 20 years and was clearly set out within the Local
Housing Strategy and Community Plan along with other key Council and partner strategies. 
In October 2017, the Scottish Government established the Homelessness and Rough Sleeping
Action Group (HARSAG) to develop solutions to end homelessness.  Final recommendations
included a requirement for local authorities to develop a 5-year Rapid Re-housing Transition
Plan (RRTP), setting out the local context and detailing actions which partners would have to
take to achieve a change in reducing homelessness.
12

Page 13

The Scottish Government had provided funding of £2.66 million to support delivery of the South
Lanarkshire RRTP, which was significantly less than the £14 million estimated to be required. 
Despite the significant shortfall in funding, tangible success had been achieved in years 1 to 3 of
the Plan, as outlined in the report. 
The fourth year of the RRTP (2022/2023) had proved extremely challenging both locally and
nationally, with national statistics reflecting homelessness at the highest level since current
statistics began in 2002.  The increase was significantly more pronounced within South
Lanarkshire than Scotland as a whole and had resulted in a wholescale reversal on the
previously reduced trend in relation to the level of homelessness and had also placed extreme
strain on local services and budgets.  The scale of demand experienced in 2022/2023 resulted
in an overspend in the homelessness budget. 
The annual RRTP review, approved by this Committee on 30 August 2023, noted the scale and
impact of the reversal experienced in the year and reconsidered the ambitious 5-year targets to
significantly reduce homelessness and caseload backlog to a new target to reduce or maintain
current levels within 2023/2024. 
In July 2023, SOLACE (the Society of Local Authority Chief Executives) and ALACHO (the
Association of Local Authority Chief Housing Officers) produced a report which set out a wide
range of concerns, including a chronic shortage in the supply of affordable housing, an
increasing demand trend that was projected to continue and a risk to the delivery of new builds
at the scale required culminating in a housing emergency in Scotland.  As local authorities and
partners increasingly raised concerns over pressures in the homeless system, the Scottish
Government had established a short life Housing Review Group in June 2023.  The focus of the
Group was to consider the recommendations of SOLACE and ALACHO, explore opportunities to
increase affordable housing supply and maximise existing supply to meet demand. 
The local issues and actions were detailed in the report which included statistics on the
continuing scale of increased demand which compared the position at the end of November
2023 with the corresponding period in the previous year. 
After consideration of all available statistical information, actions across wider authorities and
the detail of national discussions, actions to address the emergency homeless situation in South
Lanarkshire had been identified and were detailed in the report. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the scale and nature of the increase in demand for homelessness assistance, both
nationally and locally, be noted; 
(2) that the pressure and impact within South Lanarkshire stemming from the increase, which
was above those being experienced nationally, be noted; 
(3) that the mitigation measures in place be noted; and 
(4) that the proposed further actions, as detailed in paragraph 5 of the report, be noted. 
[Reference: Minutes of 30 August 2023 (Paragraph 14)]
13

Page 14

12 Lease of Proposed Development - Lanark Community Workshop at Lanark
Racecourse
A report dated 6 December 2023 by the Executive Director (Housing and Technical Resources)
was submitted advising on the action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Housing and Technical Resources), in
consultation with the Chair and an ex officio member, to grant the lease of the proposed Lanark
Community Workshop at Lanark Racecourse to Lanark Lanimer Committee. 
In October 2015, the Council had applied to the Scottish Government’s Regional Capital Grant
Fund (RCGF) to support the development of a Clydesdale Rural Development Centre in Lanark. 
The Council had received the formal offer of a grant on 19 May 2016 for £1 million against a
project cost of £2 million, with the remaining funds to come from other grants. 
The project that was submitted followed a community consultation, market appraisal and
preparation of a detailed feasibility plan developed through work with organisations including
Lanark Lanimer Committee, a potential tenant for the community facilities portion of the project. 
During 2016, negotiations to purchase the original identified site, the former Alston’s Yard,
reached an impasse so the project could not be delivered at that location.  Other locations were
considered, however, those could also not be delivered.  Consequently, there was a need to
explore other options and identify an alternative site to fulfil the intention of the grant and deliver
a workable project for the town. 
An opportunity at Lanark Racecourse, on the site of a demolished building, had been identified
as the best solution.  Following discussions with the Scottish Government, it was confirmed the
project could be progressed.  Discussions had also taken place with community representatives
and potential occupiers who had all indicated their support, in principle, for the revised project. 
The Scottish Government had confirmed a revised offer to deliver the Community Workshop
project.  The proposed site, part of the Common Good, comprising the footprint of a former
stable block, currently a concrete pad, soft landscaping and car parking area, was of sufficient
size to accommodate the building to be constructed.  Planning consent had been obtained. 
The community benefit from the Lanark Lanimer Project was assessed as if subject to the
Community Asset Transfer process and qualified for a 77% discount to the market value (rental). 
Prior to committing to the construction of the new building, negotiations had been ongoing to
agree the terms of occupation with Lanark Lanimer Committee.  Although this was not a
Community Asset Transfer, Lanark Lanimer Committee had asked that, when setting the rent,
the Council considered the role it played within the local community and the community benefits. 
The market value of the building, when completed, would be £16,000 per annum.  At a 77%
discount, the rental would be £3,680 per annum.  In addition, in return for the fit out of the
building being completed at Lanark Lanimer Committee’s expense, a 5 year rent-free period had
been requested. 
The proposed principal lease terms for the lease to Lanark Lanimer Committee, together with
any financial implications, were outlined in the report. 
The Committee decided: 
(1) that the action taken, in terms of Standing Order No 37(c), by the Executive Director
(Housing and Technical Resources), in consultation with the Chair and an ex officio
member, to grant the lease of the proposed Lanark Community Workshop at Lanark
Racecourse to Lanark Lanimer Committee, be noted; and
14

Page 15

(2) that the authority granted to the Executive Director (Housing and Technical Resources), in
consultation with the Head of Administration and Legal Services, to conclude matters and
enter into the necessary legal agreements in terms of the principal conditions contained in
paragraph 4.6 of the report and terms which were in the best interests of the Council, be
noted. 
[Reference: Minutes of Community and Enterprise Resources Committee of 9 August 2022
(Paragraph 13)] 
Councillors Lockhart and Marrs, having declared an interest in this item, withdrew from the meeting
during its consideration 
13 Acquisition of Houses at Jacktonhall, Jackton (Section 75 Planning Reference
EK/09/0218) and Brackenhill Farm, Hamilton (Section 75 Planning Reference
HM/10/0052)
A report dated 14 December 2023 by the Executive Director (Housing and Technical
Resources) was submitted requesting approval to acquire 89 homes across 2 developments, at
Jacktonhall, Jackton and Brackenhill Farm, Hamilton, from Barratt Homes, for inclusion in the
Council’s housing stock in fulfilment of the Planning obligations associated with the development
of the residential sites. 
At its meeting on 30 November 2022, the Council’s Executive Committee had approved the
Local Housing Strategy 2022 to 2027 and a new affordable housing supply target for the Council
which aimed to deliver an additional 1,300 homes by 31 March 2027.  This would be delivered
through a combination of new Council homes and the acquisition of existing homes on the
market, with the new sites set out within the Strategic Housing Investment Plan (SHIP) which
was updated on an annual basis. 
On 8 November 2023, the SHIP 2024 to 2029 had been approved by this Committee.  This
included projects with a total potential capacity for delivering up to 2,442 affordable homes in
South Lanarkshire over the 5-year period to March 2029 and included both Jacktonhall, Jackton
(40 units) and Brackenhill Farm, Hamilton (49 units). 
In November 2023, the Council entered into discussions with Barratt Homes to fulfil its planning
obligation for new affordable homes through a turnkey arrangement with the Council paying
staged payments for each key stage completed for each house.  The mix of houses across the
sites consisted of 2, 3 and 4-bedroom homes including cottage flats, terraced, semi-detached
and detached houses.  It was anticipated that those houses would be completed in 2026. 
The proposal provided by Barratt Homes had been assessed by the Council’s relevant technical
and commercial services as presenting value for money for the Council.  Therefore, it was
proposed to acquire 89 completed houses from Barratt Homes, subject to the principal
conditions detailed in the report. 
Acquisition of the properties would be funded from the Housing Revenue Account, Capital
Programme and would be eligible for Scottish Government Affordable Housing grant funding
which would reduce the overall cost to the Council. 
The proposed purchase price for each unit type compared favourably with the asking prices of
the same house types within the development and prices of similar new properties on the open
market. 
An officer undertook to provide the Chair with the number of 4-bedroom homes included in the
proposal.
15

Page 16

The Committee decided: 
(1) that the acquisition of 89 completed affordable homes from Barratt Homes for a total price
of £17.8 million (which included the cost of land and circa £500,000 in recoverable VAT
payments), to fulfil the Planning obligations associated with the residential development of
the sites, be approved; and 
(2) that authority be delegated to the Executive Director (Housing and Technical Resources) to
instruct Legal Services to conclude transactions, in the appropriate manner and in the best
interests of the Council, where each individual transaction was in excess of the current
£100,000 acquisition limit under the existing delegated powers arrangements. 
[Reference: Minutes of 8 November 2023 (Paragraph 8) and Minutes of the Executive
Committee of 30 November 2022 (Paragraphs 6 and 7)] 
14 Former David Milne Centre, 84 Old Mill Road, Uddingston – Asset Transfer to
Rivals School of Martial Arts 
A report dated 10 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted advising of a request for asset transfer, by lease, of the former David Milne
Centre, 84 Old Mill Road, Uddingston to Rivals School of Martial Arts and requesting approval of
the principal terms and conditions of asset transfer, as detailed in the report. 
The Council owned the former David Milne Centre, 84 Mill Road, Uddingston.  The property
closed in March 2023 and was currently vacant. 
Rivals School of Martial Arts had been in existence for 16 years and a charity since April 2016. 
The School had submitted a request for Community Asset Transfer (CAT) of the former hall, by
lease, with the validation date of 18 September 2023. 
In addition to placing the application and supporting documentation on the Council’s Planning
Portal, notices had been placed on the property advising that the Council was considering an
asset transfer.  The closing date for responses was 19 October 2023, at which time 57
representations had been received, 34 in favour and 23 objections. 
The request had been considered at the CAT Assessment Panel on 12 December 2023 when
matters in relation to the property, organisation and project had been taken into consideration. 
It was proposed to lease the former David Milne Centre, 84 Old Mill Road, Uddingston to Rivals
School of Martial Arts on the principal terms and conditions detailed in the report. 
The Committee decided: 
(1) that the former David Milne Centre, 84 Old Mill Road, Uddingston be leased to Rivals
School of Martial Arts, subject to the terms and conditions detailed in paragraph 5 of the
report; and 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters in respect
of the lease and enter into the necessary legal agreements on terms which were in the best
interests of the Council.
16

Page 17

15 Former Hareleeshill Sports Barn, Donaldson Road, Larkhall – Lease to Rivals
School of Martial Arts
A report dated 10 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted advising of a request for asset transfer, by lease, of the Hareleeshill Sports Barn,
Donaldson Road, Larkhall, to Rivals School of Martial Arts and requesting approval of the
principal terms and conditions of asset transfer, as detailed in the report. 
The subjects at Hareleeshill Sports Barn, Donaldson Road, Larkhall were, until recently,
managed by South Lanarkshire Leisure and Culture (SLLC).  Following a review of its business
plan, the SLLC Board announced that it could not sustain service delivery from that facility and
control had been returned to the Council. 
Rivals School of Martial Arts had approached the Council with a request for an annual lease of
the subjects to enable the facility to re-open for community participation in sports, participation in
martial arts and associated health promotion activities.  The lease would enable them to operate
the facility whilst testing the viability of a future Community Asset Transfer (CAT). 
This was not a formal CAT request in terms of the Community Empowerment (Scotland) Act
2015, however, the application to lease had been assessed following the established CAT
procedure.  The CAT Working Group had recommended that the applicants be granted a 100%
rent reduction for the annual lease. 
It was proposed to lease the subjects at Hareleeshill Sports Barn, Donaldson Road, Larkhall to
Rivals School of Martial Arts on the principal terms and conditions detailed in the report. 
The Committee decided: 
(1) that the subjects at Hareleeshill Sports Barn, Donaldson Road, Larkhall, be leased to
Rivals School of Martial Arts, subject to the terms and conditions detailed in paragraph 5 of
the report; and 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters in
respect of the lease and enter into the necessary legal agreements on terms which were in
the best interests of the Council. 
16 Former Spittal Community Centre, Carrick Road, Rutherglen and Former Toll
Pitch Community Hall, Hamilton Road, Cambuslang – Lease to the LEAP Project 
A report dated 10 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted advising of a request for a concessionary lease of the former Spittal Community
Centre, Carrick Road, Rutherglen and former Toll Pitch Community Hall, Hamilton Road,
Cambuslang to the LEAP Project and seeking approval of the principal terms and conditions, as
detailed in the report. 
The subjects at Spittal Community Centre, Carrick Road, Rutherglen and Toll Pitch Community
Hall, Hamilton Road, Cambuslang were, until March 2023, managed by South Lanarkshire
Leisure and Culture (SLLC).  Following a review of its business plan, the SLLC Board
announced that it could not sustain service delivery from those facilities and control was
returned to the Council. 
The LEAP Project had approached the Council with a request for an annual lease of those
subjects to enable the facilities to re-open for community use.  The leases would enable them to
operate the facilities whilst testing the viability of a future Community Asset Transfer (CAT).
17

Page 18

This was not a formal CAT request in terms of the Community Empowerment (Scotland) Act
2015, however, the application to lease had been assessed following the established CAT
procedure.  The CAT Working Group had recommended that that the applicants be granted a
100% rent reduction for the annual leases and it was anticipated that a formal CAT application
would be developed. 
The Council had no alternative operational requirement for either of the subjects.  Should the
lease prove unsustainable for the LEAP Project, the Council would have the ability to resume full
ownership and consider the future of the properties. 
It was proposed to lease the subjects at Spittal Community Centre, Carrick Road, Rutherglen
and Toll Pitch Community Hall, Hamilton Road, Cambuslang to the LEAP Project on the
principal terms and conditions detailed in the report. 
The Committee decided: 
(1) that the former Spittal Community Centre, Carrick Road, Rutherglen be leased to the
LEAP Project, subject to the terms and conditions detailed in paragraph 5.1 of the report; 
(2) that the former Toll Pitch Community Hall, Hamilton Road, Cambuslang be leased to the
LEAP Project, subject to the terms and conditions detailed in paragraph 5.2 of the report;
and 
(3) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all matters in
respect of the leases and enter into the necessary legal agreements on terms which were
in the best interests of the Council. 
17 Housing and Technical Resource Plan: Quarter 2 Progress Report 2023/2024 
A report dated 5 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted on the Housing and Technical Resource Plan Quarter 2 Progress Report for
2023/2024 for the period 1 April 2023 to 30 September 2023. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG), which indicated that an action had been completed. 
Details were provided on:- 
 progress against all Resource Plan measures contained in the Quarter 2 Progress Report
2023/2024, as detailed in Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in paragraph 5.3 of the
report
 areas for improvement and associated management actions, as detailed in paragraph 5.4
of the report 
The Committee decided: 
(1) that the Housing and Technical Resource Plan Quarter 2 Progress Report 2023/2024, as
summarised at paragraph 5.2 and detailed in Appendix 2 of the report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in paragraph 5.3 of
the report, be noted; and 
18

Page 19

(3) that the areas for improvement and associated management actions, as detailed in
paragraph 5.4 of the report, be noted. 
[Reference: Minutes of 31 May 2023 (Paragraph 4) and Minutes of South Lanarkshire Council
of 15 June 2022 (Paragraph 3)] 
18 Delegated Authority Report – Update 
A report dated 10 January 2024 by the Executive Director (Housing and Technical Resources)
was submitted on transactions processed by Property Services during Quarters 2 and 3 of
2023/2024. 
The Executive Director (Housing and Technical Resources), under delegated powers, had
authority to deal with various transactions including:- 
 leases up to the value of £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
Details of the transactions undertaken during Quarters 2 and 3, as contained in Appendix 1 of
the report, were as follows:- 
Quarter 2 2023/2024:
Number of transactions 107
Total value of lease transactions £91,405.30 per annum
Total value of capital transactions £7,176,652
Total value of miscellaneous transactions 21 
Quarter 3 2023/2024:
Number of transactions 103
Total value of lease transactions £83,302.29 per annum
Total value of capital transactions £6,949,200
Total value of miscellaneous transactions Nil  
The Committee decided: that the report be noted. 
[Reference: Minutes of 31 May 2023 (Paragraph 9)] 
19 Urgent Business 
There were no items of urgent business. 
Chair’s Closing Remarks
The Chair advised the Committee that this would be the Clerk, Helen Calley’s last meeting, as she
would be leaving the Council, and wished her all the best for the future. 
19

Page 20

20

Page 21

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2023/2024 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2023 to 26 January 2024 for Housing and Technical
Resources (excl HRA)
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position as at 26 January 2024 on Housing and Technical
Resources (excl HRA) Revenue Budget, and the forecast to 31 March 2024 of
a breakeven position after approved transfers to reserves, as detailed in
Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the fourth revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) on Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. Probable Outturn: Following the Council’s formal Probable Outturn exercise, the
forecast for the budget to 31 March 2024 is a breakeven position after approved
transfers to reserves of £1.510 million.  This is made up of overspends in the Estates
and Property Maintenance services, offset by an underspend in Office
Accommodation. 
5.2. As at 26 January 2024, there is a breakeven position against the phased budget. 
3
21

Page 22

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no climate change, sustainability and environmental Implications in terms
of the information contained within this report.   
7 Other Implications
7.1 The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed. In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
7.2 Inflationary and budget pressures this year increase the risk of overspend however
we have mitigated through providing additional funds in future years’ budget
strategy, and, in this year, through some reserve funds available. 
8 Equality Impact Assessment and Consultation Arrangements
8.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2 There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 March 2024 
Link(s) to Council Values/Priorities/Outcomes
   Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 20 March 2024 
List of Background Papers
 Financial ledger and budget monitoring results to 26 January 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  graham.booth@southlanarkshire.gov.uk
22

Page 23

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 26 January 2024 (No.11) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
26/01/24
Actual
26/01/24
Variance
26/01/24 
%
Variance
26/01/24 Notes            
Budget Category            
Employee Costs 50,062  48,205 1,858  40,227 38,517 1,710 under 4.3% 
Property Costs 19,319  21,038  (1,719)  16,104 17,575 (1,471) over (9.1%) 
Supplies & Services 13,832  14,010  (178)  9,778 9,967 (189) over (1.9%) 
Transport & Plant 4,723  4,408  315  3,567 3,375 192 under 5.4% 
Administration Costs 3,754  3,734  20  477 580 (103) over (21.6%) 
Payments to Other Bodies 8,600  8,625 (25)  6,288 6,253 35 under 0.6% 
Payments to Contractors 12,865 12,625 240  9,427 9,221 206 under 2.2% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  181 (27)  41 62 (21) over (51.2%) 
Total Controllable Exp. 113,309  112,826 484 85,909 85,550 359 under 0.4% 
Total Controllable Inc. (95,717) (96,743) 1,026 (59,433) (59,074) (359) under
recovered (0.6%) 
Net Controllable Exp. 17,592  16,082  1,510 26,476 26,476 0  - 0.0% 
Transfer to Reserves as
at (26/01/24) 0  1,510  (1,510)  0  0  0  -   
Position After Transfers
to Reserves (26/01/24) 17,592  17,592 0  26,476 26,476 0  - 0.0% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate. 
Approved Transfers to Reserves 
Detailed in Appendix B and C 
23

Page 24

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 26 January 2024 (No.11) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
26/01/24
Actual
26/01/24
Variance
26/01/24 
%
Variance
26/01/24 Notes            
Budget Category            
Employee Costs 4,034  4,016  18  3,231 3,187 44 under 1.4% 
Property Costs 6,638  7,305  (667)  5,194 5,813 (619) over (11.9%) 1
Supplies & Services 217  212  5  241 237 4 under 1.7% 
Transport & Plant 194  154  40  178 143 35 under 19.7% 
Administration Costs 156  145  11  56 65 (9) over (16.1%) 
Payments to Other Bodies 4,728  4,626  102  3,856 3,737 119 under 3.1% 2
Payments to Contractors 2,709  2,468  241  1,855 1,651 204 under 11.0% 3
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  20  (9)  3 2 1 under 33.3% 
Total Controllable Exp. 18,687  18,946  (259)  14,614 14,835 (221) over (1.5%) 
Total Controllable Inc. (8,458) (10,273) 1,815  (5,851) (6,133) 282 over
recovered 4.8% 4
Net Controllable Exp. 10,229  8,673  1,556  8,763 8,702 61 under (0.7%) 
Transfer to Reserves as
at (26/01/24) 0  1,485 (1,485)  0  0  0  -   
Position After Transfers
to Reserves (26/01/24) 10,229  10,158  71 8,763 8,702 61 under (0.7%) 
Variance Explanations 
1. The overspend relates to the cost of works on temporary accommodation to meet current demand.
2. The underspend relates to commissioned services in the homelessness budget where expenditure varies according to service requirements.
3. The underspend relates to commissioned services in the homelessness budget where expenditure varies according to service requirements.
4. The over recovery relates mainly to rent from temporary accommodation stock. 
Budget Virements 
There are no virements to report. 
Approved Transfers to Reserves (£1.485m): 
i. Ukraine Resettlement Funding.  (£1.485m) 
24

Page 25

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 26 January 2024 (No.11)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
26/01/24
Actual
26/01/24
Variance
26/01/24 
%
Variance
26/01/24 Notes            
Budget Category            
Employee Costs 46,029  44,189 1,840  36,996 35,330 1,666 under 4.5% 1
Property Costs 12,681  13,733  (1,052)  10,910 11,762 (852) over (7.8%) 2
Supplies & Services 13,615  13,798  (183)  9,537 9,730 (193) over (2.0%) 3
Transport & Plant 4,529  4,254  275  3,389 3,232 157 under 4.6% 4
Administration Costs 3,598 3,589  9  421 515 (94) over (22.3%) 
Payments to Other Bodies 3,872 3,999 (127)  2,432 2,516 (84) over (3.5%) 
Payments to Contractors 10,156 10,157 (1)  7,572 7,570 2 under 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143 161 (18)  38 60 (22) over (57.9%) 
Total Controllable Exp. 94,623 93,880 743  71,295 70,715 580 under 0.8% 
Total Controllable Inc. (87,260) (86,471) (789)  (53,582) (52,941) (641) under
recovered (1.2%) 5
Net Controllable Exp. 7,363  7,409 (46)  17,713 17,774 (61)  over 0.3% 
Transfer to Reserves as
at (26/01/24) 0  25  (25)  0  0  0  -   
Position After Transfers
to Reserves (26/01/24) 7,363  7,434 (71)  17,713 17,774 (61)  over 0.3% 
Variance Explanations 
1. The variance relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are determined.
2. The overspend relates primarily to service charges within the estates service.
3. The level of expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue
works.
4. The level of expenditure on scaffolding, plant and other transportation costs varies depending on the current workload demands and timing of works on a
wide variety of capital and revenue works.
5. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
There are no virements to report. 
Approved Transfers to Reserves (£0.025m): 
i) Local Heat and Energy Efficiencies Strategies (LHEES).  (£0.025m) 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2023/2024 - Housing and
Technical Resources - Housing Revenue Account
(HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2023 to 26 January 2024 for Housing and Technical
Resources (HRA)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report, and the forecast to
31 March 2024 of a breakeven position be noted; and 
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the fourth revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. Probable Outturn: Following the Council’s formal Probable Outturn exercise, the
forecast for the budget to 31 March 2024 is a breakeven position. 
5.2. This breakeven position includes a lower than budgeted Transfer from Reserves
being required in the financial year.  The increased level of costs experienced will be
offset by an underspend in Loan Charges this financial year.  
4
27

Page 28

5.3. A reduction in spend on Loan Charges is anticipated in 2023/2024 from utilising an
in-year benefit from the Housing Revenue Account Loans Fund Review.  This was
approved by Council on 21 February 2024 as part of the 2024/2025 budget setting
report for the HRA. 
5.4. As at 26 January 2024, there is a breakeven position against the phased budget. 
6 Climate Change, Sustainability and Environmental Implications
6.1 There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
7. Other Implications
7.1 The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed. In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
7.2 Inflationary and budget pressures this year increase the risk of overspend, however,
these pressures are assessed and managed within the budget planning exercise for
current and future years. 
8 Equality Impact Assessment and Consultation Arrangements
8.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2 There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 March 2024 
Link(s) to Council Values/Priorities/Outcomes
  Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 20 March 2024 
List of Background Papers
 Financial ledger and budget monitoring results to 26 January 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  graham.booth@southlanarkshire.gov.uk
28

Page 29

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 26 January 2024 (No.11) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
26/01/24
Actual
26/01/24
Variance
26/01/24 
%
Variance
26/01/24 Notes            
Budget Category            
Employee Costs 15,310  15,401  (91)  12,343 12,409 (66) over (0.5%) 
Property Costs 50,929  56,610  (5,681)  34,269  38,885 (4,616) over (13.5%) 1
Supplies & Services 653  691  (38)  557  551 6 under 1.1% 
Transport & Plant 196  189  7  119 113 6 under 5.0% 
Administration Costs 5,570  5,597  (27)  427 443 (16) over (3.7%) 
Payments to Other Bodies 2,974  2,979  (5)  1,696  1,703 (7) over (0.4%) 
Payments to Contractors 100  145  (45)  68  68 0 - 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 27,162  27,162  0  25,167  25,167 0 - 0.0% 
Total Controllable Exp. 102,894  108,774  (5,880)  74,646  79,339 (4,693) over (6.3%) 
Total Controllable Inc. (115,940) (116,768) 828  (85,715) (85,908) 193 over
recovered 0.2% 2
Transfer to/(from) Balance
Sheet (4,907) (853) (4,054)  (3,118) (1,123) (1,995) under
recovered (64.0%) 3
Net Controllable Exp. (17,953) (8,847) (9,106)  (14,187) (7,692) (6,495)  over (45.8%) 
Loan Charges 17,953  8,847  9,106  6,495  0  6,495 under (100.0%) 4
Net Controllable Exp. 0  0  0  (7,692) (7,692) 0  - 0.0% 
Variance Explanations 
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.
3. The net combined overspend requires for a lower than budgeted level of transfer from reserves at this time.
4. The underspend is due to a reduction in spend on Loan Charges anticipated from utilising an in-year benefit from the Housing Revenue Account Loans
Fund Review.   
Virements 
There are no virements to report. 
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing and
Technical Resources (excl. Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl. HRA) for the period 1 April 2023 to 26 January 2024.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation:
[recs]
(1) that the Housing and Technical Resources capital programme of £11.488
million, and expenditure to date of £2.332 million, be noted; and 
(2) that the projected outturn of £8.800 million be noted.
[1recs]
3. Background
3.1. This is the fourth capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2023/2024. 
3.2. As noted in the last report to this Committee (7 February 2024), the budget for Housing
and Technical Resources for financial year 2023/2024 was £11.488 million.  There has
been no change to this budget since the last report to this Committee.   
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2023/2024 Budget   
The total capital programme for Housing and Technical Resources is £11.488 million,
as detailed in Section 3.2.   
5
31

Page 32

5.2.     2023/2024 Outturn
As reported previously to this Committee, the predicted spend position for this financial
year for Housing and Technical Resources suggested an outturn of £8.800 million, an
underspend of £2.688 million.  This mainly reflects the anticipated timing of spend on
a number of multi-year projects, resulting in budget required in 2024/2025 rather than
2023/2024. 
5.3. The projects which will now underspend in 2023/2024 include:  Prioritised Urgent
Investment Programme and Lifecycle Replacement – Schools.  Funding for these
projects will carry forward into next financial year.   
5.4. The year-end position is currently being finalised and this will be reported to the
Executive Committee on 26 June 2024.  The final position for the Housing and
Technical Resources programme will be reported to the next Committee thereafter, on
18 September 2024.      
5.5. Period 11 Position   
The anticipated spend to date was £2.402 million and spend to 26 January 2024
amounts to £2.332 million, an underspend of £0.070 million.  This mainly reflects the
timing of project spend on the demand led Prioritised Urgent Investment Programme
being less than anticipated at this time.     
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
3 April 2024 
Link(s) to Council Values/Priorites/Outcomes
 Accountable, effective, efficient and transparent 
32

Page 33

Previous References
 Housing and Technical Resources Committee, 7 February 2024 
List of Background Papers
▪ Financial ledger to 26 January 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
33

Page 34

Appendix A 
South Lanarkshire Council
Capital Expenditure 2023-24
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2023 – 26 January 2024 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000
Asset Management
Programmes 10,636 299 0 10,935  2,239 2,170
Private Housing Scheme of
Assistance 1,000 (1,000) 0 0  0 0
Other Housing 163 390 0 553  163 162
TOTAL 11,799 (311) 0 11,488  2,402 2,332 
34

Page 35

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing and
Technical Resources (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April 2023 to 26 January 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources (HRA) capital programme
of £67.443 million, and expenditure to 26 January 2024 of £45.478 million be
noted. 
3. Background
3.1. This is the fourth capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2023/2024. 
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 20 March 2024. 
3.3. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2023/2024 totals £67.443 million and is detailed
along with the funding sources at Appendix A to this report.   
5.2. Actual expenditure to 26 January 2024 is £45.478 million.  This is £2.253 million
ahead of programme and is due to the number of buy backs through the open
market purchase scheme being ahead of programme to date. 
5.3. Current estimates suggest an outturn of £67.443 million.  The Resource is expecting
to spend to this level. 
5.4. 2024/25 Resource Planning Assumption (RPA)  Grant : We have been advised 
that the RPA for South Lanarkshire is £22.149m for 2024/2025 and that this will be
6
35

Page 36

followed up with a formal letter.  This reflects a significant reduction in grant due to
the overall funding being made available for affordable housing being reduced.
Given the council is the strategic housing authority, we will now consider how this
impacts progress within our housing route map and engage with our partner
Registered Social Landlords in order to prioritise sites that are already committed to,
that are cost effective and will resolve housing need in pressurised areas with a view
to continue to deliver upon the Strategic Housing Investment Plan (SHIP) and strive
towards our 1300 target.  We continue to engage with the Scottish Government’s
More Homes team in this regard.  This will be reported back to committee in due
course. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
7.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact on the supply chain for the foreseeable future.  The impact will continue to be
monitored through the four weekly investment management meetings.  Further
updates will be reported in the coming months with any significant increases in
contract values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 March 2024 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, Effective, Efficient and Transparent 
Previous References
▪ Executive Committee, 20 March 2024 
List of Background Papers
▪ Financial ledger to 26 January 2024 
36

Page 37

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
37

Page 38

South Lanarkshire Council       Appendix A
Housing Capital Programme 2023/24
As at 26 January 2024 
£m £m
Anticipated Capital Expenditure 2023/24   67.443
Estimated Financing Position 2023/24   
Capital Receipts  1.683  
Capital Financed From Current Revenue 27.162  
Prudential Borrowing 23.166  
Specific Grant – Scottish Government New Council Houses 10.048  
Specific Grant – Scottish Government Buy Backs 5.264  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
67.443 
Actual Expenditure to 26 January 2024  45.478 
Actual Financing Position to 26 January 2024   
Capital Receipts  1.923  
Capital Financed From Current Revenue 27.162  
Prudential Borrowing 8.419  
Specific Grant – Scottish Government New Council Houses 7.843  
Specific Grant – Scottish Government Buy Backs 0.000  
Specific Grant – Scottish Government Mortgage to Rent 0.131  
Other Income 0.000        
45.478 
38

Page 39

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – December 2023 to February 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for December 2023 to February 2024 relating to
Housing and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for December 2023 to February
2024 relating to Housing and Technical Resources be noted:- 
 attendance statistics;
 occupational health;
 accident/incident statistics;
 discipline, grievance and Dignity at Work cases;
 analysis of leavers and exit interviews;
 staffing watch as at 9 December 2023 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for December 2023 to
February 2024. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of February 2024 for
Housing and Technical Resources. 
The Resource absence figure for February 2024 was 5.6%.  This figure has
increased by 0.6% when compared to last month and is 0.8% lower than the Council-
wide figure.  Compared to February 2023, the Resource absence figure has
increased by 0.5%. 
7
39

Page 40

Based on the absence figures at February 2024 and annual trends, the projected
annual average absence for the Resource for 2023/2024 is 5.8%, compared to a
Council-wide average figure of 5.4%. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and, additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall 156 referrals were made this period.  This represents an
increase of 29 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 28 accidents/incidents recorded within the Resource this period, an
increase of 16 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 2 disciplinary hearings were held within the Resource.  This figure
has decreased by 3 when compared to the same period last year.  During this period
3 appeals were heard by the Appeals Panel.  This figure has increased by 3 when
compared to the same period last year.  No Appeals Panels were pending, a
decrease of 1 when compared to the same period last year.  One grievance was
raised within the Resource and this figure has increased by 1 when compared to the
same period last year.  No Dignity at Work complaint was raised within the
Resource.  This figure has decreased by 1 when compared to the same period last
year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 15 leavers in the Resource this period eligible for an exit
interview. This figure has increased by 7 when compared with the same period last
year.  Nine exit interviews were conducted in this period, an increase of 5 when
compared with the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:-
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period December 2023 to February 2024, 30
employees (23.10 FTE) in total left employment, Managers indicated that all 30 posts
(23.10 FTE) were being replaced. 
5. Staffing Watch 
5.1. There has been an increase of 8 in the number of employees in post from 9
September 2023 to 9 December 2023. 
40

Page 41

6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no risk implications or risk in terms of the information contained within this
report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
13 March 2024   
Link(s) to Council Values/Ambitions/Objectives
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others 
Previous References
 Housing and Technical Resources, 7 February 2024 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Eileen McPake, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:    Eileen.McPake@southlanarkshire.gov.uk
41

Page 42

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 3.2 5.5 5.7 April 3.6 10.6 6.9 April 3.3 7.6 6.2 April 4.3 5.6 5.1
May 2.9 4.5 4.9 May 4.2 8.1 6.1 May 3.4 6.0 5.4 May 4.9 5.4 5.1
June 3.5 4.9 5.4 June 6.2 8.5 6.8 June 4.6 6.4 6.0 June 4.7 5.3 4.7
July 4.0 5.5 5.0 July 5.7 8.9 8.1 July 4.7 6.9 6.2 July 4.0 4.6 3.8
August 4.9 4.7 5.1 August 7.9 7.1 8.5 August 6.2 5.7 6.4 August 4.7 4.4 4.1
September 5.8 4.5 4.7 September 8.1 6.3 7.8 September 6.8 5.2 6.0 September 6.4 5.4 5.3
October 5.2 4.3 4.9 October 9.0 7.8 5.2 October 6.8 5.8 5.0 October 6.3 5.8 5.1
November 5.7 4.6 4.8 November 9.2 7.8 6.7 November 7.2 5.9 5.6 November 6.9 6.5 6.2
December 4.6 4.4 5.1 December 9.5 7.2 7.4 December 6.7 5.6 6.0 December 6.9 7.0 6.6
January 5.2 4.5 4.4 January 8.8 5.5 6.0 January 6.7 4.9 5.0 January 7.0 5.8 6.1
February 6.4 4.4 5.2 February 8.5 6.2 6.3 February 7.3 5.1 5.6 February 6.6 5.9 6.4
March 7.8 5.3 March 10.7 6.8 March 9.0 5.9 March 7.9 6.4
Annual Average 4.9 4.8 5.0 Annual Average 7.6 7.6 6.9 Annual Average 6.1 5.9 5.8 Annual Average 5.9 5.7 5.4
Average Apr-Feb 4.7 4.7 5.0 Average Apr-Feb 7.3 7.6 6.9 Average Apr-Feb 5.8 5.9 5.8 Average Apr-Feb 5.7 5.6 5.3
886 565 1451 16199
Council Wide
No of Employees at 29 February 2024No of Employees at 29 February 2024 No of Employees at 29 February 2024 No of Employees at 29 February 2024
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
APT&C Manual Workers
42

Page 43

HOUSING AND TECHNICAL RESOURCES
Dec - Feb Dec - Feb
2022 / 2023 2023 / 2024
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 26 30
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 2
TOTAL 127 156
Dec - Feb Dec - Feb
2022 / 2023 2023 / 2024
Over 7 day absences 2 1
Over 3 day absences** 0 1
Minor 8 22
Near Miss 0 1
Violent Incident:  Physical**** 1 0
Violent Incident:  Verbal***** 1 3
Total Accidents/Incidents 12 28
Dec - Feb Dec - Feb
2022 / 2023 2023 / 2024
Total Number of Hearings 5 2
Total Number of Appeals 0 3
Appeals Pending 1 0
Time Taken to Convene Hearing December 2023 - February 2024
0-3 Weeks 4-6 Weeks Over 6 Weeks
1 1 0
Dec - Feb Dec - Feb
2022 / 2023 2023 / 2024
Number of Grievances 0 1
Still in Progress 0 1
Dec - Feb Dec - Feb
2022 / 2023 2023 / 2024
Number of Incidents 1 0
Number Resolved at Formal Stage 1 0
Dec - Feb Dec - Feb
2022 / 2023 2023 / 2024
Career Advancement 3 5
Moving Outwith Area 0 2
Personal Reasons 0 1
Dissatisfaction With Terms and Conditions 1 0
Other 0 1
Number of Exit Interviews conducted 4 9
Total Number of Leavers Eligible for Exit Interview 8 15
Percentage of interviews conducted 50% 60%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
57
APPENDIX 2
49 58
15 9
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
37
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
43

Page 44

FTE H/C FTE H/C
Terminations/Leavers 23.10 30 90.94 114
Being replaced 23.10 30 86.83 109
Filling on a temporary basis 0.00 0 0.00 0
Plan to transfer this budget to another post 0.00 0 0.00 0
End of fixed term contract 0.00 0 2.11 3
Held pending service Review 0.00 0 2.00 2
Plan to remove for savings 0.00 0 0.00 0
Appendix 2a
Reason Dec 2023 - Feb 2024 Cumulative total
44

Page 45

As at 9 December 2023
Total Number of Employees
F/T P/T F/T P/T
791 24 330 133
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 200.18 619.36 355.58 29.60 10.00 0.00 0.00 0.00 1217.72
As at 9 September 2023
Total Number of Employees
F/T P/T F/T P/T
802 25 332 127
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 205.10 623.16 357.38 29.60 10.00 0.00 0.00 0.00 1228.24
MALE FEMALE TOTAL
TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
Salary Bands
Appendix 3
JOINT STAFFING WATCH RETURN
HOUSING & TECHNICAL RESOURCES
1278
1286
*Full - Time Equivalent No of Employees
MALE FEMALE
45

Page 46

46

Page 47

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: Proposed Partnership with Social Bite 
1. Purpose of Report
1.1. The purpose of this report is to:- 
♦ update Housing and Technical Resources Committee on discussions with Social
Bite to develop an innovative approach to meeting the accommodation and
support needs of single homeless households. 
♦ seek approval to lease a site at Harriet Street Rutherglen to Social Bite to
establish 15 units of supported accommodation at a nominal rent of £1. 
2. Recommendation(s)
2.1. Housing and Technical Resources Committee is asked to approve the following
recommendations:- 
(1) approve the principle of the Council granting a 5 year lease with option to extend
for a further 5 years of site at Harriet Street Rutherglen to Social Bite, for Social
Bite to establish 15 units of supported accommodation at a nominal annual rent
of £1, as summarised in this report; and 
(2) delegate authority to the Executive Director of Housing and Technical
Resources, in consultation with the Head of Administration and Legal Services,
to conclude legal agreements relating to the proposed arrangements with Social
Bite. 
3. Background 
3.1. Discussion between Housing and Technical Resources and Social Bite commenced
in early summer of 2020, exploring the option of a partnership approach to meeting
the accommodation and support needs of homeless households.  Social Bite
approached the council as a charity organisation who were able to front fund the
proposal of a homeless village, providing modular housing in line with similar models
across the country. 
3.2. The proposal is based on a model which has operated successfully in Edinburgh
since 2017, whereby Social Bite provide temporary accommodation for homeless
people through an innovative partnership with the city council. The council provided
an unused piece of land in Granton and Social Bite contributed funding for labour
and materials to develop the site, which at the time was forest land.  The site was
developed to provide 20 wooden cabins referred to as Nest Homes, each containing
bedroom, kitchen, shower room and living area. 
8
47

Page 48

3.3. Social Bite also partnered with Hillcrest Housing Association who provide a housing
management service and Cyrenians who provide on-site housing support, in a
similar way to South Lanarkshire’s current arrangements for 1st Stop and Supported
accommodation, with partners such as The Salvation Army and Blue Triangle. 
3.4. This project was called The Village and is designed to provide a highly supportive
community with emphasis on encouraging and nurturing peer support alongside
professional housing support services. 
3.5. The physical site used in Edinburgh lends itself to this with each tenant having their
own homely environment, including a small section of outdoor space attached to
their home to develop as they wish and to enjoy. There is also a community facility
with sufficient space for all residents to gather to eat, socialise and participate in a
wide range of social, health and wellbeing activities. This model offers the ability for
residents to enjoy their own space and build independent living skills with all the
facilities to deliver necessary support for the period required while developing
independent living skills. 
3.6. The Village model has proved successful with very positive feedback from those who
have spent time within this temporary accommodation model. 
4. South Lanarkshire Council Context
4.1. Discussion with Social Bite coincided with the council’s development of a Temporary
Accommodation Strategic Plan. This involved consideration of the optimum portfolio
of temporary accommodation in the context of national developments such as the
revised Unsuitable Accommodation Order and updated Code of Guidance for
Homelessness, which included new temporary accommodation standards to be
achieved. 
4.2. The majority of accommodation utilised to meet the needs of homeless households
within South Lanarkshire meets required standards. The vast majority meeting the
Council’s more stringent optimal standard, which is for temporary accommodation to
be ordinary homes within ordinary communities. 
4.3. At that time, the only exception to this was accommodation at Lindsay House,
assessed as at risk of failing to meet expected standards due to the deteriorating
condition of the property, its scale and level of shared facilities. A range of
interventions aimed to address this, including reduction in population
accommodated, however, events took over and due to repeat flooding and
disproportionate costs to continue to operate, the service closed fully in December
2023. 
4.4. Housing and Technical Resources had anticipated Lindsay House would operate
until a replacement Supported Accommodation service was identified to relocate the
service. Therefore, unexpected earlier closure has left a shortfall in supported
accommodation. 
4.5. Housing Services Temporary Accommodation Strategic Plan demand analysis,
based on 2022/23 level of need for supported accommodation, reflects supply
requirement of 64 units of supported accommodation. Current provision is at 36
units. 
4.6. It is recognised that this is a spend to save project, as need for temporary
accommodation has significantly increased in line with the spike in homelessness
demand resulting in unprecedented use of unsuitable B&B accommodation, at
48

Page 49

projected cost of around £100,000 for 2023/2024, more than double the allocated
annual budget, a stark contrast to previous years which have seen a significant
underspend. This also contributes to wider issues including regulatory risk utilising
accommodation considered unsuitable as response to homelessness, ongoing risk
of breaching the unsuitable accommodation order and risk to ability to accommodate
and meet basic statutory duty. 
5. Proposal
5.1. Following detailed discussion with Social Bite, the proposal is for the development of
15 units of accommodation to be delivered at Harriet Street, Rutherglen. It is
proposed that the site which is owned by the Council, within general services, will be
leased to Social Bite, based on a 5-year lease agreement with the option to extend
for a further 5 years at a nominal rent of £1 per annum. It is considered that the
project would make a significant contribution to addressing the shortfall of supported
accommodation noted at section 4.5 above. This approach would also compliment
other solutions, such as a growing Housing First outreach support model, and do so
within a suitable location for the project to settle into and work with local partners
with a view to adding value to the local area. 
5.2. Social Bite will provide 15 high quality, carbon neutral cabin homes, which come with
a 60-year lifespan testament to the quality of materials and design. The council will
have exclusive access for the purpose of using the units to provide temporary
accommodation to homeless individuals for a weekly rental fee in line with temporary
accommodation rents which will come to the council.  This proposal brings value for
money, whereby Social Bite will also provide annual grant funding to support the
project. 
5.3. The council will cover operational costs related to maintaining, letting, and managing
the site, thus minimising the lease costs for the accommodation. 
5.4. Subject to the Committee’s decision, the Council will appoint a 3rd sector partner to
manage the Council’s involvement in the project, which will be dealt with separately
in accordance with the Council’s standard procurement arrangements, this will
include collection of rental income. This income will cover rental costs payable by the
Council to Social Bite for use of the accommodation and a percentage will be re-
invested in the project covering running costs, as set out in detail at Appendix 2. As
part of the legal agreement between Social Bite and the council, the arrangements
will include opportunities whereby Social Bite, through their charity organisation, will
promote employment and educational opportunities, supporting community wealth
and connect the project to local services within the community. 
5.5.  Social Bite will retain ownership of the modular housing units for removal from site at
the end of the lease period, in line with the lease agreement.   
5.6. The costs associated for this new village partnership include design and consultancy
work, preparatory ground works to a Council owned site, infrastructure, and siting of
15 individual cabins.  Beyond development, ongoing service costs have been
calculated with input from Finance and Benefit and Revenue Teams, though these
will be refreshed ahead of any future go live date to take account of uplifts. 
5.7. The site which has been identified at Harriet Street, Rutherglen is zoned for
residential use in the Adopted South Lanarkshire Local Development Plan (site plan
included at Appendix 1). The site is considered suitable to achieve the model that
both the Council and Social Bite wish to deliver, ensuring that occupants can access
49

Page 50

amenities but also have privacy to tackle any complex support needs and be out with
the public eye. 
5.8. Meantime, site investigations are progressing.  To date, no concerns have been
identified based on information held or from initial desk top surveys, however, more
detailed investigation is underway to confirm site suitability taking account of
industrial history of general area, utility requirements and costs to develop site to
required condition ready for placement of cabin accommodation. 
5.9. Since initial discussions began, demand for homeless services has significantly
increased over the last year, resulting in reliance on reserves to meet service costs
in the last year and same projected forward. 
5.10. The business case for this new village has been based on an appropriate rent level
for supported accommodation, taking account of housing benefit applicable level,
and rent collection assumptions, occupancy and turnover rates, rent due to Social
Bite for use of the cabin accommodation, management and support service provider
costs. Also, allowing for recurring Social Bite contribution (return on rent collected) to
support the project. All associated operational costs can be accommodated within
the existing homeless budget. 
5.11. A key consideration in the business case for progressing this partnership approach is
the Council’s requirement for increase in supply of supported accommodation and
exclusive opportunity within this model to attract significant external funding, not
available through any other route, therefore reducing costs of what is a necessary
site development for the council.  
6. Next Steps Proposed
6.1. Housing and Technical Resources will continue to support Social Bite with preparing
applications for Planning Permission and Building Warrants with the assistance of
colleagues across Council services. 
6.2. In the usual way, these applications will be subject to statutory publicity, consultation
and decision-making processes. Subject to the Committee’s decision, a cross-
service project group will be established, to include housing, legal, procurement and
finance services, to take forward the necessary contract and commercial activities
with Social Bite. 
6.3. Once the formal processes are completed, and full approval has been provided, an
update report will be brought to a future committee meeting for noting, which will
include project timelines and handover dates. 
7. Employee Implications
7.1. There are no employee implications arising from this proposal, however employees
from a range of council services will work to put in place the necessary contractual,
procurement and service arrangements. 
8. Financial Implications
8.1.  Appendix 2 sets out the projected costs for project delivery and subsequent ongoing
operating costs. 
8.2.  This includes the breakdown of the estimated project delivery costs of £3.357m.
Social Bite costs are anticipated at £1.677m for the supply of cabins, furnishings, site
works and associated fees.  Social Bite have also committed to annual grant funding
to support the project. Council costs are anticipated at £1.680m for site works and
50

Page 51

associated fees. The Council’s share of project delivery costs will be funded through
the Homelessness Service. 
8.3.  Appendix 2 also provides the breakdown of the estimated ongoing operating costs.
These are estimated at £0.552m per annum. Anticipated rental income and service
charges from service users is anticipated totalling £0.263m. In addition, Social Bite
will provide an annual contribution of £0.088m. This reduces the net ongoing cost to
the Council to £0.201m per annum. This will be funded from within the existing
Homelessness revenue budget and is a significant reduction compared to the
arranged £0.500m operating costs for Lindsay House in recent financial years. The
financial benefit from this will be utilised for ongoing financial pressures within the
Homelessness Service. 
8.4. Given the current condition of the proposed site, and the current absence of
alternative uses for it, it is considered that the proposed lease will enable the Council
to secure Best Value in respect of this use of the site, especially when the nature of
the proposal is considered, the non-financial benefits and how it will contribute to the
health and social wellbeing of the area. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The proposal, if agreed, would deliver 15 units of accommodation in the form of
modern and comfortable, sustainable with a 60-year lifespan, carbon neutral, highly
insulated modular homes. 
10. Other Implications
10.1. There will be community interest in any site identified and requirements around
consultation in due course. 
10.2. The Project will assist the council and partners in meeting the accommodation and
support needs of homeless households, therefore meeting statutory homeless
duties. 
10.3. Social Bite bring community wealth opportunities by having the modular housing
designed and built within South Lanarkshire and will bring employment and
educational opportunities to our customers as a result of our partnership and their
charity status. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
8 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable. 
51

Page 52

Previous Reference
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jacqueline Fernie
Ext: 07795 454041
Email: Jacqueline.fernie@southlanarkshire.gov.uk 
Appendix 1 – Site Plan
Appendix 2 – Project Costs
52

Page 53

4,515.0 Square meters    342.0 Meters
Crown copyright and database rights 2017.  Ordnance Survey 100020730.,
Crown copyright and database rights 2023.  Ordnance Survey 100020730.
03/08/2023 18:22:03
South Lanarkshire Council
1:1,250Scale
(c) Crown Copyright and database rights 2023.  Ordnance Survey Licence number 100020730.
Title:
Notes:
Original Drawing Size: 210 x 297 (A4) (c)
Ownership Map
SLC = AREA SHADED RED
8
53

Page 54

54

Page 55

Appendix 2 
Project Delivery Costs 
Costs  Donations Total 
Social Bite  SLC Total Social Bite 
£m  £m £m £m £m
Structure Costs  1.382 0.000 1.382 (0.201) 1.181
Furnishing  0.062 0.000 0.062 (0.035) 0.027
Site Costs  0.100 1.111 1.211 (0.040) 1.171
Project &
Professional Costs
0.006 0.422 0.428 (0.002) 0.426
Contingency  0.127 0.147 0.274 0.000 0.274
Total Expenditure  1.677 1.680 3.357 (0.278) 3.079 
Annual Operating Costs 
£m 
Commissioned
Services Costs
0.299
Rent 0.126
Repairs 0.030
Void Rent Loss 0.029
Furniture 0.030
Utilities 0.013
Other Costs 0.025
Total Costs 0.552
Rental Income (0.263)
Net Costs 0.289  
Social Bite Grant 0.088
SLC Costs 0.201 
8
55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:  Low Waters Hall, Hamilton – Community Asset Transfer
to Low Waters Community Group 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for a lease of Low Waters Hall, Elliot Crescent,
Hamilton by Low Waters Community Group and seek approval to the principal
terms and conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at of Low Waters Hall, Eliot Crescent, Hamilton be leased to
Low Waters Community Group, subject to the terms and conditions outlined in
Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at Low Waters Hall were previously managed by South Lanarkshire
Leisure and Culture (SLLC) and, following a review of its business plan, the SLLC
Board announced that it could no longer sustain this facility and the property was
returned to the Council. 
3.2. A request for an asset transfer to lease the subjects to the Trustees of Clyde Scouts
was approved by Committee on 8 December 2021. However, because of
organisational issues within the Trustees of Clyde Scouts, the lease has not
concluded. 
3.3.     The Trustees of Clyde Scouts have now requested that their interest be transferred to
Low Waters Community Group a SCIO (Charity number SC 052955) to take on the
lease to enable the facility to re-open for community use.  The lease will enable Low
Waters Community Group to operate the facility. 
3.4. The individuals from the local community that were involved in the previous application
from Trustees of Clyde Scouts are now reconstituted within Low Waters Community
Group, however, the business plan, investment, objectives and operational intentions
are unchanged from the original application. 
9
57

Page 58

3.5.   The application was validated on 23 July 2021. The application and supporting
documents were placed on the planning portal. 
3.6. The Community Asset Transfer Working Group assessed the original application and
recommended that that the applicants be granted a 67% rent reduction on the rental.
This is considered equally applicable to Low Waters Community Group given the
similarities in the organisations, membership, and objectives. However, the Asset
Transfer Panel has reviewed the proposal and taken the following matters into
account.           
3.7. Property
3.7.1. The extent of the property is shown on the attached plan and, as there is no change
of use or development, planning consent will not be required. 
3.7.2. The property has potential commercial value and there is interest from an adjoining
proprietor should the community asset transfer not proceed. 
3.8. Organisation
3.8.1. Low Waters Community Group is a SCIO (Scottish Charitable Incorporated
Organisation) Company Registration a SCIO (Charity number SC 052955). 
3.8.2. The purpose of the organisation is to provide facilities for community development,
recreational facilities, and resources to the residents of Hamilton.
3.9. Project
3.9.1. The proposal is for Low Waters Community Group to re-open the facility as a
community hall and then, through their management, develop additional activity. 
Initially, the use will focus principally upon accommodation for the Scouts. 
3.9.2. The financial viability of the project is considered marginal and low revenue income
presents a risk. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.2. The lease will enable the facility to re-open and relieve the Council of the costs of
empty property rates, utility charges, insurance costs and repairs, however, it does
defer the ability to generate a capital receipt. 
4.3. The Council has no alternative operational requirement for the subjects. The risks of
the transfer are considered low, however, should the lease prove unsustainable for
Low Waters Community Group, the Council will have the ability to resume full
ownership and consider the future of the property. 
5. Proposal
5.1. It is proposed to lease Low Waters Hall to Low Waters Community Group, on the
following principal terms and conditions:- 
1. The lease will be to the Low Waters Community Group.
2. The lease will be for a period of 20 years.
3. The date of entry to be agreed.
4. The rental shall be £825 per annum being a 67% discount on the market value
of £2,500 p.a.
5. The tenants shall be granted break options on the second, fifth and tenth
anniversary of the date of entry. 
58

Page 59

6. The lease to be fully repairing and insuring.
7. The tenants shall be granted a tenant break option in the event of any single
major repair exceeding £30,000 (2024 value) during the term of the lease.
8. The tenants will pay the buildings insurance costs as charged by the Council.
9. The tenants will be required to obtain and exhibit, as required, public liability
insurance to the value of £5 million for any one claim.
10. The property will be used as a community hall.
11. The tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects.
12. Assignation and subletting will not be allowed.
13. Landlord's consent will be required for any structural alterations to the property.
14. Each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required.
15. A one year rent free period to be granted to the tenants, during the first 12 months
whilst the property is being improved. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates, insurance
and utility standing charges and repairs and maintenance. 
7.2.    The property has an estimated capital receipt value in the order of £30,000- £50,000. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council initially had
until 23 January 2023 to provide a notice of its decision whether to agree to or refuse
the asset transfer. 
9.2.    The organisation had a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request was refused or the organisation
didn’t agree with the proposed terms and conditions. 
9.3 However, this recent request is for a different organisation and in delivering a
community managed facility in light of the continued interest, the process has
continued to allow the necessary organisational issues to be resolved. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
59

Page 60

5 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities. 
Previous References
♦ Housing and Technical Resources Committee 8 December 2021        
Low Waters Hall Hamilton – Asset Transfer to the Trustees of Clyde Scouts 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/21/0005 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk 
60

Page 61

61

Page 62

62

Page 63

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Former Walston Primary School, Elsrickle – Asset
Transfer to Biggar and District Men’s Shed 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
♦ advise Committee of the request for asset transfer, by sale, of the former
Walston Primary School at Elsrickle to Biggar and District Men’s Shed and seek
approval to the principal terms and conditions of asset transfer as set out in
Section 5 of the report 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the former Walston Primary School be sold to Biggar and District Men’s
Shed subject to the terms and conditions outlined in Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the sale and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. At its meeting on 29 September 2021, the Housing and Technical Resources
Committee approved the lease of the former Walston Primary School to Biggar and
District Men’s Shed. 
3.2.  The Biggar and District Men’s Shed has been in occupation since the 10 year lease
commenced on 22 October 2021.  The terms of the lease being full repairing and
insuring, a rental of £2,100 per annum, representing a 65% discount on market value
to reflect community benefits, and a rent-free period of a year to enable the Men’s
Shed to become established in its new premises.  Biggar and District Men’s Shed
subsequently requested and was granted an additional 1 year rent free to take
account of the increasing revenue costs and their work to increase their
membership. 
3.3. Although the lease still has over 7 years to run, Biggar and District Men’s Shed is
now seeking to purchase the property outright and submitted a formal request for
Community Asset Transfer, the validation date for which was 30 November 2023. 
3.4. The application and supporting documentation was placed on the Council’s Planning
Portal.  The closing date for responses was 11 January 2024, at which time one
neutral representation was received. 
10
63

Page 64

3.5. The request was placed before the Community Asset Transfer Assessment Panel on
27 February 2024 when the following matters were taken into consideration. 
3.6. Property
3.6.1. The extent of the property requested, is shown on the attached plan. 
3.6.2. The Council registered its title in 2013 and this should now be the subject of warranty
by the Registers of Scotland, however, this will require to be verified and potentially
require an insurance to be obtained as part of the transaction. 
3.6.3. Since taking on the lease, Biggar and District Men’s Shed has carried out a number
of repairs including rewiring the property, replacing the windows and doors, installing
a log burner and creating a disabled access to the property. A polytunnel has been
installed on the grounds.  It has also commissioned a condition survey report which
indicates that investment in the region of £224,500 is required to bring the property
up to modern standards. 
3.6.5.  The property was valued by the District Valuer in 2021 at £80,000. The in-house
valuer has confirmed that this figure remains appropriate and reflects current market
conditions. 
3.7. Organisation
3.7.1. Biggar and District Men’s Shed is a Scottish Charitable Incorporated Organisation
(SCIO), Scottish Charity No. SC049102. The organisation has now been established
for 5 years. 
3.7.2. The purpose of the organisation is to provide recreational facilities and advance the
social needs, health and wellbeing of men of all ages and backgrounds living in the
Biggar and surrounding areas. 
3.7.3. The organisation membership has increased from 21 at the beginning of the lease to
over 50 members. 
3.7.4. There are strong connections with other community groups in the area, the support
of a national Men’s Shed organisation and the Trustees have a range of skills and
experience. 
3.7.5. In terms of the organisation’s financial position, accounts show a small surplus,
however this reflects the rent-free arrangement and an external grant towards
energy costs. The organisation’s viability remains vulnerable and there is still some
way to go to become financially sustainable. 
3.7.6. Biggar and District Men’s Shed is due to pay rent from 23 October 2023 however
have requested that a further continuation of the rent-free period be allowed. This
has not been agreed to date and consideration of the request has been overtaken by
the asset transfer request. The rental due until 24 May 2024 is £1,424. 
3.8. Project
3.8.1. The project is to invest further in the property and continue to use the facility as a
Men’s Shed. The organisation feels strongly that being owners rather than tenants
will increase their stability and sustainability, as well as give them access to a wider
range of external funding opportunities. 
64

Page 65

3.8.2. At present, no firm project or funding plans have been presented as part of the
application. The intention would appear to be to tender for the works after securing
the agreement to the purchase and then apply for funding. 
3.8.3. The business model is based around income being generated from donations, sale
of products and services created by members and open days. As mentioned above,
the business model has a financial risk. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation clearly has the
drive and enthusiasm to further develop a vibrant Men’s Shed delivering support and
opportunities to those in the community that can feel isolated. However, the condition
of the property, the lack of a project or funding plan and the financial risks present
concerns regarding the viability and sustainability of the proposal. 
4.2. The request for asset transfer is based upon sale of the property at £1. The
community benefits derived from the proposal relate to health and wellbeing,
education, environmental and recreational. 
4.3. The Community Asset Transfer Working Group assessed the potential community
benefits and recommended that a discount of between 75% and 90% be applied to
the market value to reflect the benefits to the community. 
4.4. The risks associated with the asset transfer are considered medium to high, and the
application to purchase is a little premature, however, it is also recognised that there
are considerable community benefits derived from the project. On balance, the
Assessment Panel considers that it is appropriate to agree the sale subject to the
protections in Section 5. 
5. Proposal
5.1. It is proposed to sell the former Walston Primary School, as shown on the attached
plan, to Biggar and District Men’s Shed, on the following principal terms and
conditions:- 
(i) The sale will be to Biggar and District Men’s Shed 
(ii) The purchase price will be £8,000, exclusive of VAT (reflecting 90% discount) 
(iii) The date of entry to be agreed, subject to the conditions below
(iv)  Each party to be responsible for their own legal expenses, however, the
purchasers will require to pay any registration fees and Land and Buildings
Transaction Tax (LBTT) if required. 
To mitigate against the risks identified at Section 4, the sale will be conditional upon 
(v) Evidence of the availability of funding to deliver a significant investment in the
property.
(vi) The terms and conditions of the existing lease, including rental being due from
23 October 2023, being met.
(vii) A 2-year, long stop date. 
6. Employee Implications
6.1. There are no employee implications for South Lanarkshire Council. 
65

Page 66

7. Financial Implications
7.1. The property is surplus to Council operational requirements and, although currently
subject to a concessionary lease, has potential to generate a capital receipt in the
order of £80,000. 
7.2. As the current lease is on full repairing and insuring terms, Council has no revenue
costs associated with this property. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until
30 May 2024 to provide a notice of its decision whether to agree to or refuse the
asset transfer request. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request is refused or the organisation
does not agree with the proposed terms and conditions. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community and Enterprise, Land Services,
Planning, Legal, and Finance Services as well as having been published for public
consultation. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
11 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Work with communities and partners to promote high quality, thriving and sustainable
communities
 Caring, connected, sustainable communities 
Previous References
 Minutes of Housing and Technical Resources Committee, 29 September 2021 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/23/0015 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk
66

Page 67

10
67

Page 68

68

Page 69

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Community Asset Transfer of 33 Smyllum Road,
Lanark – 5 year Lease to Healthy Valleys 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Committee of the request for a 5 year lease of 33 Smyllum Road, Lanark
by Healthy Valleys and seek approval to the principal terms and conditions as set
out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the subjects at 33 Smyllum Road, Lanark the be leased to Healthy Valleys
subject to the terms and conditions outlined in Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at 33 Smyllum Road, Lanark form part of a range of retail units in Council
and private ownership.  In 2022 Healthy Valleys were granted an annual tenancy of
the unit on commercial terms to develop their operations and form which to provide
local services. 
3.2. Healthy Valleys have now approached the Council with a request for a 5 year lease of
the subjects to enable the facility to futher develop. 
3.3. This is a formal Community Asset Transfer request in terms of the Community
Empowerment (Scotland) Act 2015. The request was validated on 1 December. The
application and supporting documentation was placed on the Planning Portal. The
closing date for responses was 4 January 2024 at which time no public comments
were received. The application for the lease was considered by the Community Asset
Transfer Assessment panel on 31 January 2024 where the following matters were
taken into consideration. 
3.4. Property
3.4.1. The extent of the property is shown on the attached plan and there is no change of
use or development proposed. 
3.5. Organisation
11
69

Page 70

3.5.1. Healthy Valleys is a charitable company limited by Guarantee Company Registration
No SC246145 and Charity Registration No SCO34253.  The organisation has been
operating since 2003.  Healthy Valleys are a strong, well-established body with diverse
community focussed activities throughout Clydesdale Area. 
3.5.2. The purpose of the organisation is to provide facilities, activities, and resources to
protect mental and physical health education for the residents of Lanark and
Clydesdale.
3.6. Project
3.6.1. The proposal is for Healthy Valleys to continue to use the facility as a centre for their
mental and physical health education activities.  The grant of 5-year lease will allow
the organisation to continue to develop the facility for the longer term with security of
occupation. 
3.6.2. The facility will provide opportunities for Warm Spaces, Peer Support Group and a   
series of workshops and classes. 
4. Assessment
4.1. The property continues to be suitable for the use and the organisation has ability,
capacity and funds to manage the facility. 
4.2. The grant of the 5-year lease will enable the tenants to invest in the facility and relieve
the Council of the costs of empty property rates, utility charges, insurance costs and
repairs. 
4.3. The risks associated with the proposed lease are considered low, given the status of
the organisation and the community benefits already being delivered. 
5. Proposal
5.1. It is proposed to lease the subjects at 33 Smyllum Road, Lanark on the following
principal terms and conditions:- 
i. The lease will be to Heathy Valleys.  
ii. The lease will be for a period of 5 years.
iii. The date of entry to be agreed.
iv. The rental shall be £1 per annum, if asked.
v. The lease to be fully repairing and insuring.
vi. The tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim.
vii. The Council will insure the property and recover the costs from the tenants.
viii. The tenants will meet the costs of any common repairs and maintenance of the
common areas on a pro rata basis.
ix. The property will be used in conjunction with the tenant’s activities as providers
of physical and mental health education.
x. The tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects.
xi. Assignation and subletting (excluding hourly lets) will not be permitted without
the Council's express consent. 
xii. Each party to be responsible for their own legal costs however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required. 
6. Employee Implications
6.1. There are no employee implications associated with this report.
70

Page 71

7. Financial Implications
7.1. The lease will result in a loss of rental income of £4,350 per annum. However it should
be noted that this is not currently being received and would be dependent on attracting
an alternative tenant at market value. 
7.2.   The letting will result in a saving of any void property costs including empty rates,
insurance and utility standing charges and repairs and maintenance. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. The Council will manage the retained common repairs liabilities for the retail range. 
9.2. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until
31 May 2024 to provide a notice of its decision whether to agree or to refuse the asset
transfer request. 
9.3. The organisation has the right to appeal to Scotland Ministers should a decision not
be made in that timescale, if the asset transfer is refused or the organisation does not
agree with the proposed terms and conditions. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
13 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
♦ None 
List of Background Papers
 Application and supporting documentation via Planning Portal ref CAT/23/0014. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073  (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
71

Page 72

72

Page 73

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Community Asset Transfer of Former St Leonard’s
Hall, East Kilbride to East Kilbride Men’s Shed - 15
Year Lease 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Committee of the request for a 15 year lease of the former
St Leonard’s Hall by East Kilbride Men’s Shed and seek approval to the principal
terms and conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the former St Leonard’s Hall be leased to East Kilbride Men’s Shed subject
to the terms and conditions outlined in Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal
agreements on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at the former St Leonard’s Hall were managed by South Lanarkshire
Leisure and Culture (SLLC) and used as a store. A short-term lease to East Kilbride
Men’s Shed to enable the organisation to build capacity and develop a sustainable
business model was agreed in February 2022. The current rent is £3,600 per annum
to cover all utilities and property costs, excluding non-domestic rates for which the
group has responsibility. 
3.2. East Kilbride Men’s Shed has now approached the Council with a request for a 15
year lease of the subjects to enable the facility and the organisation to further
develop. 
3.3. This is a formal community asset transfer request in terms of the Community
Empowerment (Scotland) Act 2015.  The validation date for which was 20 November
2023.  The application and supporting documentation was placed on the Council’s
planning portal.  The closing date for responses was 27 December 2023, and no
comments were received.  The application for the lease was considered by the
Community Asset Transfer Panel on 31 January 2024, where the following matters
were taken into consideration. 
3.4. Property
12
73

Page 74

3.4.1. The extent of the property is shown on the attached plan and as there is no change
of use or development proposed. Separate meters have been installed to allow the
relevant utility costs to be appropriately allocated to the proposed occupation. 
3.4.2. The request does include a small additional area of open space to be included.  This
area, however, forms sight lines for the car park traffic and it is not recommended for
inclusion in the lease. 
3.5. Organisation
3.5.1. East Kilbride Men’s Shed is a charitable company limited by Guarantee Company
Registration No SC048316.  The organisation has been operating since 2017 and
registered as a SCIO in 2018.  East Kilbride Men’s Shed is the second oldest men’s
shed in South Lanarkshire. 
3.5.2. The purpose of the organisation is to provide facilities, activities and resources to the
residents of East Kilbride in particular, reducing isolation of individuals and develop
capacity to share skills and knowledge with the community.
3.6. Project
3.6.1. The proposal is for East Kilbride Men’s Shed to continue to use the facility as a
Men’s Shed and offices.  The grant of 15 year lease will allow the organisation to
continue to develop the Men’s Shed for the long term with security of occupation. 
4. Assessment
4.1. The property continues to be suitable for the use and the organisation has the
capacity and funds to manage the facility. 
4.2. The grant of the 15-year lease will enable the tenants to invest in the facility and
relieve the Council of the costs of empty property rates, utility charges, insurance
costs and repairs. 
4.3. The risks associated with the proposed lease are considered low, given the status of
the organisation. 
4.4. The Council has no alternative operational requirement for the subjects.  Should the
lease prove unsustainable for tenants, the Council will have the ability to resume full
ownership and consider the future of the property. 
4.5 The Community Asset Working Group assessed the existing and potential
community benefits and recommended that a discount of 90% be applied to the
market value of £9.550 to reflect these. However, in light of the utility costs and
communal charges associated with the building, it is proposed to grant a 2-year rent
free period to allow the transitioning to direct metering of the utilities. 
5. Proposal
5.1. It is proposed to lease the subjects at the former St Leonard’s Hall to East Kilbride
Men’s Shed on the following principal terms and conditions: - 
i. the lease will be to the former St Leonard’s Hall, East Kilbride. 
ii. the lease will be for a period of 15 years.
iii. the date of entry to be agreed.
iv. the rental shall be £955 per annum (reflecting 90% discount).
v. a rent free period of 2 years will be granted from the date of entry.
vi. the lease to be fully repairing and insuring.
74

Page 75

vii. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim.
viii. the Council will insure the property and recover the costs from the tenants.
ix. the tenants will meet the costs of any common repairs and maintenance of the
common areas on a pro rata basis.
x. the property will be used in conjunction with the tenant’s activities as operators    
of a ‘Men’s Shed’ within the Scottish Men’s Shed Association.
xi. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects.
xii. assignation and subletting (excluding hourly lets) will not be permitted without
the Council's express consent. 
xiii. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates,
insurance and utility standing charges and repairs and maintenance. 
7.2. The property has an estimated capital receipt value in the order of £75,000. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. The Council will manage the retained common repairs liabilities for areas shared with
the adjacent Library. 
9.2. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until
20 May 2024 to provide a notice of its decision whether to agree or refuse the asset
transfer request. 
9.3. The organisation has the right to appeal to Scottish Ministers should a decision not
be made in that timescale, if the asset transfer is refused or the organisation does
not agree with the proposed terms and conditions. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal
Services and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
13 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
75

Page 76

 Caring, connected, sustainable communities 
Previous References
♦ Standing Order 36 (C) Report approved 27th January 2022 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/23/0013. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073 (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
76

Page 77

77

Page 78

78

Page 79

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Tom Craig Centre, 3 Lawhill Road, Law – Lease to Law
Boxing Club Limited 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Committee of the request for a lease of the Tom Craig Centre, 3
Lawhill Road, Law by Law Boxing Club Limited and seek approval to the principal
terms and conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the subjects at the Tom Craig Centre, 3 Lawhill Road, Law be leased to
Law Boxing Club Limited subject to the terms and conditions outlined in Section
5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal
agreements on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at the Tom Craig Centre, 3 Lawhill Road, Law, were, until recently,
managed by South Lanarkshire Leisure and Culture (SLLC). 
3.2.  Following its meeting of 28 February 2024, the SLLC Board advised this facility was
affected by the budget setting decisions for 2024/25 and was, therefore, at risk. 
3.3. Law Boxing Club Limited approached the Council with a request for an annual lease
of the subjects to enable the facility to remain open for community use as quickly as
possible.  The lease will enable them to operate the facility whilst testing the viability
of a future Community Asset Transfer (CAT). 
3.4. This is not a formal CAT request in terms of the Community Empowerment
(Scotland) Act 2015, however, similar matters have been considered. 
3.5. Property
3.5.1. The extent of the property is shown on the attached plan and as there is no change
of use or development, consequently, planning consent will not be required. 
3.6. Organisation
13
79

Page 80

3.6.1. Law Boxing Club Limited is a nonprofit company limited by Guarantee Company
Registration No SC799007.  The company has recently been formed and this is its
first step in terms of property management. 
3.6.2. The purpose of the organisation is to provide facilities, activities and resources to the
residents of Law, Carluke, Overtown and the Clyde valley area.
3.7. Project
3.7.1. The proposal is for Law Boxing Club to initially re-open the facility using it as a
boxing club and gym hall to promote health, fitness and wellbeing and then, through
their management, develop additional activity which will evidence a sustainable
operating model and support a future CAT application.  The grant of an annual lease
will allow the organisation to assess the viability of the proposal and develop plans
for a future, longer term agreement or purchase. 
3.7.2. The organisation has a number of ideas for the expansion of the use of the facility for
the wider community, however, is keen to limit the impact of the hall’s potential
closure on local community groups, whilst it develops its proposals. The group
propose to support existing hires and introduce new activities into the hall to
maximise the use as a community centre. 
3.7.3. The club will generate income from running core activities as a boxing gym through
fees and routine fund raising, which will allow them to offer access to the wider
community at a reduced rate. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.2. The grant of the annual lease will enable the facility to remain open and relieve the
Council of the costs of empty property rates, utility charges, insurance costs and
repairs. 
4.3. The risks associated with the proposed lease are considered low, given both the
status of the organisation and that the request is for a year-to-year lease. 
4.4. The Council has no alternative operational requirement for the subjects.  Should the
lease prove unsustainable for Law Boxing Club Limited, the Council will have the
ability to resume full ownership and consider the future of the property, however, it is
anticipated that a formal application for CAT will be forthcoming. 
5. Proposal
5.1. It is proposed to lease the subjects at the Tom Craig Centre, 3 Lawhill Road, Law,
ML8 5JQ to Law Boxing Club Limited on the following principal terms and
conditions:- 
i. the lease will be to Law Boxing Club Limited. 
ii. the lease will be for a period of 1 year.  
iii. the date of entry to be agreed.
iv. the rental shall be £1 per annum, if asked.
v. the lease to be fully repairing and insuring.
vi. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim.
vii. the Council will insure the property and recover the costs from the tenants.
viii. the property will be used as a boxing club, gym and community facility.
80

Page 81

ix. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects.
x. assignation and subletting (excluding hourly lets) will not be allowed without the
Council's express consent. 
xi. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required. 
5.2. At the expiry of the lease, the Council and Law Boxing Club Limited will consider
renewal of the lease subject to being satisfied as to the operation of the subjects by
the tenants. 
6. Employee Implications
6.1. There are no employee implications directly associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates,
insurance and utility standing charges and repairs and maintenance. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. There are no other implications in terms of the information contained in the report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal
Services and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
13 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk 
81

Page 82

82

Page 83

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Bothwell Community Hall, 8 Fallside Road, Bothwell -
Lease to Bothwell Futures 
1. Purpose of Report
1.1. The purpose of the report is to:- 
advise the Committee of the request for a lease of Bothwell Community Hall,
8 Fallside Road, Bothwell by Bothwell Futures and seek approval to the principal
terms and conditions as set out in Section 5 of the report
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the subjects at Bothwell Community Hall, 8 Fallside Road, Bothwell be
leased subject to the terms and conditions outlined in Section 5 of the report;
and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal
agreements on terms which are in the best interests of the Council.
3. Background
3.1. The subjects at Bothwell Community Hall, 8 Fallside Road, Bothwell were, until
recently, managed by South Lanarkshire Leisure and Culture (SLLC). 
3.2. Following its meeting of 28 February 2024, the SLLC Board advised that this facility
was affected by the budget setting discussions for 2024/25 and was, therefore, at
risk. 
3.3. Bothwell Futures approached the Council with a request for an annual lease of the
subjects to enable the facility to remain open for community use as quickly as
possible.  The lease will enable them to operate the facility whilst testing the viability
of a future Community Asset Transfer (CAT). 
3.4. This is not a formal CAT request in terms of the Community Empowerment
(Scotland) Act 2015, however, similar matters have been taken into consideration. 
3.5. Property
3.5.1. The extent of the property is shown on the attached plan and, as there is no change
of use or development, consequently, planning consent will not be required. 
3.6. Orqanisation
14
83

Page 84

3.6.1. Bothwell Futures is a SCIO (Scottish Charitable Incorporated Organisation)
Company Registration No SCIO 51013. As an organisation it has been operating
since June 2021 and currently owns and manages Bothwell Community Hub. 
3.6.2. The purpose of the organisation is to provide facilities for educational and
recreational activities and resources to the residents of Bothwell. 
3.6.3. This is an experienced organisation with capacity and experience to manage the
property. 
3.7. Project
3.7.1. The proposal is for Bothwell Futures to keep open the facility as a community hall
through its management, develop additional activity which will evidence a
sustainable operating model and support a future CAT application.  The grant of an
annual lease will allow the organisation to assess the viability of the proposal and
develop plans for a future, longer term agreement or purchase. 
3.7.2. The organisation has ideas for the expansion of the use of the facility, in particular
music and dance, however, it is keen to limit the impact of the hall's closure on local
community groups. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.2.  The grant of the annual lease will enable the facility to remain open and relieve the
Council of the costs of empty property rates, utility charges, insurance costs and
repairs. 
4.3. The risks associated with the proposed lease are considered low, given both the
status of the organisation and that the request is for a one year lease. 
4.4.  The Council has no alternative operational requirement for the subjects.  Should the
lease prove unsustainable for the Trust, the Council will have the ability to resume
full ownership and consider the future of the property, however, it is anticipated that
a formal application for CAT will be forthcoming. 
5. Proposal
5.1. It is proposed to lease the subjects at Bothwell Community Halt, 8 Fallside Road,
Bothwell to Bothwell Futures on the following principal terms and conditions:- 
the lease will be to Bothwell Futures. 
ii.  the lease will be for a period of 1 year. 
the date of entry to be agreed.
iv the rental shall be £l per annum, if asked. 
the lease to be fully repairing and insuring.  Neither tenant not the landlord
will be responsible for any major repair works that may be required to the
premises. 
the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim.
vii.  the Council will insure the property and recover the costs from the tenants. 
viii.  the property will be used as a community hall.
ix.  the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects.
x. assignation and subletting (excluding hourly lets) will not be allowed without
the Council's express consent. 84

Page 85

xi. each party to be responsible for their own legal costs, however, the tenants
will require to pay any registration fees and Land and Buildings Transaction
Tax (LBTT), if required. 
5.2. At the expiry of the lease, the Council will consider renewal of the lease subject to
being satisfied as to the operation of the subjects by the Trust. 
6. Employee Implications
6.1. There are no employee implications directly associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs, including empty rates,
insurance and utility standing charges and repairs and maintenance. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. There are no risk implications in terms of the information contained in this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal
Services and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
13 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
85

Page 86

86

Page 87

Report
Agenda Item 
Report to: Housing and Technical Resources Committee 
Date: 24 April 2024
Report by: Executive Director (Housing and Technical Resources) 
Subject: Refugee Resettlement Programme Review 
1. Purpose of Report
1.1. The purpose of the report is to:- 
♦ provide an update on refugee resettlement within South Lanarkshire 
♦ advise Committee of name change for the service 
2. Recommendation(s)
2.1. Housing and Technical Resources Committee is asked to approve the following
recommendations:- 
(1) to note that the Refugee Resettlement Programme continues to provide
support on the basis approved by the Housing and Technical Resources
Committee on 29 January 2020 (providing support to up to 30 families per
year); and 
(2) that the change in the name of the service from Refugee Resettlement Team
to Refugee and Asylum Support Team be noted. 
3. Background
3.1. The Refugee Resettlement Programme was established in 2015 when South
Lanarkshire partners were involved in assisting families fleeing from the Syrian civil
war. At this point, a new team was established within Housing and Technical
Resources, the Refugee Resettlement Service, which was responsible for leading on
resettlement in South Lanarkshire, including liaison with all relevant services such as
health and education. 
3.2. Commencing April 2020, the Home Office brought together a range of resettlement
programmes to ensure parity of financial support and assistance and introduced the
UK Resettlement Programme (UKRS) which aims to support refugees from any
country determined as requiring assistance by the United Nations High Commission
for Refugees. 
3.3.  At that time, South Lanarkshire Council’s Executive Committee, 29 January 2020,
approved a consolidated approach committing to support up to 10% of the Scottish
equivalent of the proposed 5000 UK wide arrivals per year, equating to
approximately 30 households for South Lanarkshire (150 individuals). 
3.4  However anticipated numbers were not achieved due to the outbreak of the Covid-19
pandemic, resulting in suspension of all Resettlement Programmes from early 2020
until 2022. 
15
87

Page 88

3.5. During 2021, a further 3 new programmes were initiated to support Afghan nationals
fleeing the country following the withdrawal of British and American military services
and supported by South Lanarkshire partners, this resulted in 12 individuals settling
in the area. 
3.6. The Ukrainian emergency in March 2022 resulted in a mass movement of the
population to surrounding countries. The UK Government initiated the Homes for
Ukraine Scheme to allow families to travel under the Ukrainian Displaced Persons
visa to stay with host families across the country. 
3.7. The Scottish Government developed a further programme linked to Homes for
Ukraine which enabled the Scottish Government to become the hosts, the Scottish
Super Sponsor Scheme (SSS).  This allowed individuals/families to enter Scotland
directly without a host family in place.  Visa applications under the SSS scheme are
currently suspended. 
3.8. South Lanarkshire was one of a number of local authorities across Scotland which
supported Ukrainians who arrived through the Super Sponsor Scheme in hotels.   
3.9. Home Office funding covers the costs associated with all planned refugee
programmes detailed in this report. 
3.10. Arrivals through any of the Resettlement Programmes have immediate recourse to
public funds and will have the right to work in the UK.  Although there is variance in
length of visas related to the various programmes. 
4. Current Situation
4.1. Over the first five years of the Syrian Resettlement Programme (now UKRS) the             
Refugee Resettlement Team supported approximately 210 individuals. 
4.2. Families (12 individuals) who arrived from Afghanistan have also been provided with
support to integrate into South Lanarkshire communities. 
4.3. The unexpected Ukrainian situation resulted in significant resettlement need across
neighbouring countries, including the UK. South Lanarkshire Council supported
approximately 1,000 individuals through welcome accommodation, and in the wider
local authority area. 
4.4. The Refugee Resettlement Team provided support to residents across 4 Scottish
Government procured hotels in the area as well as assisting approximately 250
guests in over 150 hosting arrangements.   Approximately 100 households have
been accommodated and over 170 individuals have been supported to secure longer
term accommodation options. 
4.5. Wider humanitarian programmes were suspended whilst the UK and Scottish
Government focused on the Ukrainian Displaced Person Programme (UDP), with
very limited arrivals over the last 2 years via the UKRS programme. 
4.6. Afghan arrivals to the UK increased during the latter months of 2023 and new
arrivals are expected in South Lanarkshire over the coming months via a formal
partnership between the Ministry of Defence and Mears. This is fully funded by the
UK Government, accommodation is obtained from the private sector and support
provided by the Refugee Resettlement Team, again funded by the Home Office. 
88

Page 89

4.7. In addition to Refugee Resettlement programmes, the Home Office has established
accommodation hubs for asylum seekers who are currently being dispersed across
the UK while awaiting a determination of their immigration status.    Currently there is
one hotel in the South Lanarkshire area which is supported by the Home Office.  
The Refugee Resettlement Team attend on a regular basis to provide information
and advice to residents on relevant services available and to provide support when
refugee status is awarded, with a view to preventing homelessness as far as
possible. 
4.8. The Service, therefore, now encompasses assistance to Asylum Seekers and, as
such, the Service name will be amended to Asylum and Refugee Resettlement
Service.   
4.9. The operating context in relation to the provision of support and accommodation for
asylum seekers has become increasingly challenging, particularly when considered
alongside the extreme pressures which continue to be faced in relation to
homelessness. 
5. Next Steps  
5.1. It is proposed that South Lanarkshire Council continue to assist a proportionate
share of refugee resettlement in Scotland on the basis of previous Committee
approval, that is up to 30 households per year for the next two years, 2024/25 and
2025/26. 
5.2.  It is proposed that a further report will be presented to the Housing and Technical
Resources Committee before the end of the current financial year updating on
progress with national programmes and detailing recommendations for the future
level and nature of involvement by the Council, taking account of national and,
therefore, South Lanarkshire’s proportionate share. 
6. Employee Implications
6.1. No employee implications related to this report, other than noting proposed name
change of service to Asylum and Refugee Resettlement service, reflecting existing
work of team. 
7. Financial Implications
7.1. Costs relating to all establishment proposals are covered from existing funds from
UKRS programme, Afghan programmes, and Ukrainian programme to date. 
However, the Asylum and Resettlement Service supported the Scottish
Government’s Warm Scottish Welcome, which supported Ukrainians within welcome
hotels and whilst costs were previously fully covered for this, the Scottish
Government announced mid-2023, that funding for 2023/24 would no longer be
provided.  This position changed in March 2024, when the Scottish Government
announced there was £5m funding to cover services provided within welcome hotels
across the country.  South Lanarkshire Council have submitted a claim for £0.400m
for support services provided during this time and await the outcome of this.   For
new and ongoing planned UKRS and Afghan arrivals, the Home Office and UK
Government funding mechanisms will contribute to future financial considerations.   
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. There are no risk implications in terms of the information contained in this report.
89

Page 90

10. Equality Impact Assessment and Consultation Arrangements
10.1. No equalities Impact Assessment was undertaken for the information contained
within this report as the Programme arrangements are outwith the control of the
Council. 
10.2. Trade unions have been updated in terms of the content of this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 March 2024 
Link(s) to Council Values/Priorities/Outcomes
Working with and respecting others 
Previous References
Scheme of Delegation – 12 May 2022
Executive Committee Report – 29 January 2020 
For further information please contact:- 
Jackie Fernie, Homelessness & Support Manager
Andrea Sinclair, Refugee Resettlement Programme Advisor 
90

Page 91

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: Scottish Government Consultations on the Social
Housing Net Zero Standard in Scotland and Heat in
Buildings Bill 
1. Purpose of Report
1.1. The purpose of the report is to provide Committee with:-
[purpose]
 an overview of two recent Scottish Government consultations on proposed new
net zero standard for social housing and the new Heat in Buildings Bill
 a summary of South Lanarkshire Council’s response to the consultations,
submitted to the Scottish Government on 8 March 2024.   
2. Recommendations
2.1. Committee is asked to approve the following recommendations:- 
(1)  that the overview of the consultations on the proposed new net zero standard
for social housing and Heat in Buildings Bill, be noted; and 
(2)     that the summary of South Lanarkshire Council’s response to each
consultation, be noted. 
3. Background
3.1. In 2021, the Scottish Government published a Heat in Buildings Strategy which
committed to: - 
 reviewing the existing standards for improving energy efficiency within social
housing across Scotland. The review aimed to better align the existing
standards with Scotland’s latest net zero targets, as set out in the Climate
Change (Scotland) Act 2009, as amended in 2020
 introducing new legislation to phase out the need to install new or replacement
fossil fuel boilers across all domestic and non-domestic buildings in Scotland,
whilst also requiring building owners to improve the energy efficiency of
buildings to help achieve net-zero targets, as set out in the Climate Change
(Scotland) Act 2009, as amended in 2020 
3.2. Consultations on each of these commitments were launched by the Scottish
Government in early 2024, with the public and stakeholders asked to consider how
they could be delivered within current delivery models and budgets, whilst
highlighting any possible implications from the proposals.  
16
91

Page 92

4. Overview of the ‘Consultation on the Social Housing Net Zero Standard’ and
response from South Lanarkshire Council
4.1. The consultation sought views on a proposed new energy efficiency and net zero
standard to be implemented across all social housing in Scotland. In South
Lanarkshire, this comprises over 32,000 homes, the majority of which are owned by
the Council. 
4.2. The consultation documents provide limited detail on what the proposed new Social
Housing Net Zero Standard (SHNZS) will comprise of, but highlights that it should
aim to:- 
 be compatible with and enable progress towards net zero targets
 be compatible with Scotland’s fuel poverty targets
 be compatible and consistent with proposals for other domestic buildings
 support a just transition
 set a timescale for meeting the SHNZS which recognises the pressures on
social landlords
 support the Scottish Government’s Heat Network targets
 take a realistic view of the whole system costs
 address concerns about the Standard Assessment Procedure as the underlying
methodology for a new metric
 provide flexibility for specific circumstances while still requiring action 
4.3. The consultation did detail that there would be two aspects to the standard:- 
 a requirement to achieve a yet to be defined fabric energy efficiency rating for
each home to reduce heat demand and living costs for tenants
 a requirement to install a clean heating system within each socially rented home
to contribute to reducing emissions across Scotland 
4.4. The consultation advises that the SHNZS will be introduced no earlier than 2025,
however, this will be confirmed following review of responses by a dedicated Review
Group. 
4.5. In responding to the earlier consultations on carbon reduction, the Council, along
with many other social landlords and representative bodies, have emphasised that,
for the transition to be truly just, it is essential at a national level that sufficient
funding is provided to avoid an unacceptable burden being placed upon tenants. The
Scottish Government has established a Green Heat Finance Taskforce to explore
ways of encouraging private finance with a report on the outcomes of this anticipated
later in 2024/25. 
4.6. The consultation states that the cost of meeting previous standards (Energy
Efficiency Standard for Social Housing 2) by 2032 was estimated at £3.4 to £3.7
billion in 2018.  Costs have since increased, and a new net zero standard would
require additional capital cost elements such as installing new clean heating systems
and the consultation paper suggests that total capital costs of approximately £4.6
billion will now be required for clean heating alone across the sector.  Additionally,
the Scottish Housing Regulator stated, in February 2024, that the anticipated total
costs of implementing the full standard could be in excess of £9 billion across
Scotland. 
92

Page 93

4.7. The Council submitted a response to the consultation on 8 March 2024, with a
summary of this provided below:- 
 the council is supportive of a fabric efficiency rating based on heat demand but
highlights the significant costs associated with this and the additional support
that would be required to avoid tenants having to cover all of this
 the council strongly disagrees with the proposal to prevent the relet of
properties if they do not meet the proposed new standard by 2028. The
standard itself and timescales for implementation have not yet been agreed,
making it difficult to for the council to assess the implications of this on its own
stock. A phased approach and discretion for the council would be preferable
 the council supports the requirements of installing clean heating systems by
2045 and recognises the contribution this could have on achieving wider climate
change targets. However, there are significant costs and practical challenges
associated with retrofitting the systems currently available and the response
highlights the need for additional support and guidance from the Scottish
Government on this
 the council highlights the importance of providing discretion to social housing
providers, allowing them to make the best decisions for their tenants and
housing stock whilst adhering to the regulatory framework led through the
Scottish Housing Regulator
 the council is supportive of a 2025 implementation date and notes that it would
provide clarity on the standards now required, benefitting investment
programmes for existing stock and new build specifications 
4.8. The full Council response to the consultation is available on request. 
5. Overview of the ‘consultation on the new Heat in Buildings Bill’ and response
from South Lanarkshire Council
5.1. The consultation sought views on new legislation that will be implemented to require
owners of domestic and non-domestic buildings to meet yet to be determined energy
efficiency standards and move to clean heating systems to heat their properties. 
5.2. The proposals included within the Bill are:- 
 prohibit the use of polluting heating systems after 2045
 requirement on homeowners to meet a reasonable minimum energy efficiency
standard by 2033
 requirement on private landlords to meet a reasonable minimum energy
efficiency standard by 2028
 requirement on property owners to end their use of polluting heat when a heat
network becomes available
 requirement on those purchasing a home or business premise to end their use
of polluting heating systems within a fixed period following completion of the
sale 
5.3. Given the costs associated with clean heating systems, it is anticipated this will have
a significant financial impact for existing homeowners. The availability of government
finance through grants and loans is being reviewed by the Scottish Government, as
are financial products and funding options that may be available through lenders,
business, or energy companies, to assist the transition. 
5.4. The Scottish Government states that the proposals aim to be affordable, fair, and
feasible. Provisions are included within the consultation to consider the flexibility,
93

Page 94

protections, and exemptions that specific groups may need, e.g. rural communities,
or households in fuel poverty, or vulnerable groups such as older people. 
5.5. The Council submitted a response to the consultation on 8 March 2024, with a
summary of this provided below:- 
 the Council is fully supportive of the necessity to transition to clean heating
systems to achieve climate change commitments and targets
 the Council believes that all obligated property owners must be bound by the
requirements to move to clean heating systems and to achieve a minimum
energy efficiency standard in their properties, and by the agreed deadline dates
 the Council recognises the significant financial challenges property owners may
face, and particularly in the present financial climate, and is reassured that the
Scottish Government is exploring a full range of funding options. For local
authorities, the transition requires to be fully funded and resourced. This also
includes any additional responsibility on councils to monitor or enforce the
transition
 the Council is reassured that the Scottish Government has fully considered the
scale of the challenges some vulnerable groups and communities may face to
transition and that it is exploring appropriate exemptions. However, the council
believes that exemptions should be on a case-by-case basis, and focused on
extending timescales or providing additional support to facilitate the transition
where it is technically feasible for a property to transition to a clean heating
system
 the council is concerned that the application of a cost-cap that stipulates a
maximum amount a property owner will be expected to pay to transition may
result in too many properties not meeting the standard, which will impact on the
progress made to transition to clean heating systems and targets 
5.6. The full council response to the consultation is available on request. 
6. Next Steps
6.1. Housing and Technical Resources will continue to monitor national developments in
this area and report any significant implications for the council to the relevant
Committee for noting. 
7. Employee Implications
7.1. There may be employee implications from the proposals detailed in both consultation
documents, with relevant officers requiring additional training or services requiring an
increase in personnel to meet additional tasks. The council is clear in its response to
both consultations that any additional burdens placed on council services as a result
of the proposals will require to be fully funded by the Scottish Government. 
8. Financial Implications
8.1. Actual costs to implement the proposals within the consultation documents are
unknown at this stage and will be dependent on the finalised standards and
implementation dates. It is expected, however, that costs to achieve the new SHNZS
will significantly outweigh the capital funding currently available through the council’s
Housing Investment Programme. 
8.2. In addition, the council’s non-domestic properties will be required to comply with the
standards proposed within the Heat in Buildings Bill, with costs of transitioning to
clean heating systems requiring to be fully funded and resourced. It is estimated that
the transitioning of non-domestic council properties along could be up to £900
94

Page 95

million, significantly outweighing capital funding currently available to improve or
maintain non-domestic assets.
9.       Climate Change, Sustainability and Environmental Implications
9.1. This report does not currently introduce a new policy, function or strategy or
recommend a change to an existing policy, function or strategy and therefore no
strategic environmental assessment is required, however this will be kept under
review. 
9.2. Should the proposals contained within both consultations be progressed, it is
anticipated these will have long term positive impacts on reducing emissions within
South Lanarkshire. 
10. Other Implications
10.1. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. Within its response to both consultations, the council suggests it would be
appropriate for the Scottish Government to consider the impact to vulnerable groups
and households from the proposals. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
18 March 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent 
Previous References
None 
List of Background Papers
 Scottish Government, Consultation on a new Social Housing Net Zero Standard in
Scotland, Consultation on a new Social Housing Net Zero Standard in Scotland
(www.gov.scot)
 Scottish Government, Consultation on the Heat in Buildings Bill, Delivering net zero for
Scotland's buildings - Heat in Buildings Bill: consultation - gov.scot (www.gov.scot) 
 Scottish Government, Heat in Buildings Strategy, November 2021. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Jonathan Read, Strategy and Policy Advisor
Housing and Technical Resources
E-mail: jonathan.read@southlanarkshire.gov.uk 
95

Page 96

96

Page 97

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 24 April 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: Notification of Contracts Awarded 
9 September 2023 – 29 February 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee of contracts awarded by Housing and Technical
Resources for the supply of Goods, Services and Works, following formal
tendering in excess of £50,000 during the period 9 September 2023 – 29
February 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r]
(1) that the details of the contracts awarded by Consultancy Services in Appendix
A be noted;
(2) that the details of the contracts awarded by Procurement Team in Appendix
B, be noted (including 2 jobs from July 2023 that were overlooked on the
previous contract award report; and
(3) that the details of the sub-contracts awarded by Building Services in Appendix
C, be noted.
[1recs]
3. Background
3.1. It is a requirement of Clause 21.8 of the Standing Orders on contracts that details of
the acceptance of all tenders above £50,000 be reported retrospectively to the
relevant Committee for noting, other than those under Clause 21.3 where the award
is not the lowest in a price only tender, or costs exceed the approved financial
provision.  In these instances, a report is submitted to the appropriate Committee
and subsequent authority to award is granted by that Committee. 
4. Contracts Awarded
4.1. A full list of the contracts is provided in the appendices to this report. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. Appropriate budgetary provision is available for each of the contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1 There are no climate change, sustainability or environmental implications in terms of
the information contained within this report.
17
97

Page 98

8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. There is no requirement to undertake any consultation in relation to the content of
this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
8 March 2024 
Link(s) to Council Values/ Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 7 February 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Derek Craig, Property Manager (Consultancy Services)
Ext:  845 3517 (Tel: 01698 453517)
E-mail:  Derek.Craig@southlanarkshire.gov.uk 
98

Page 99

Appendix A 
Contracts Awarded (Consultancy Services) 9 September 2023 – 29 February 2024 
Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Community
& Enterprise SLC/HT/23/083 Uddingston Library
Refurbishment
C&S Facilities Management
Ltd T/A C&S Group Refurbishment £56,378.87 14/09/2023
Housing HOD011347.006 Design, Supply and Installation
of Fire Doors - Towers CCG (Scotland) Ltd Dunlop, Lister & Fraser River
Towers Fire Door Replacement £1,326,310.94 27/09/2023
Education EDD012048.005 Mossneuk PS Kitchen
Adaptations SLC Building Services Kitchen Adaptations £132,390.24 28/09/2023
Education EDD011926 Our Lady of Lourdes
Refurbishment SLC Building Services Refurbishment £3,270,368.00 02/10/2023
Housing SLC/HT/23/174 Void Property Reinstatement CRD Property Renovations
and Reinstatements Ltd Void Property Reinstatements £500,000.00 27/10/2023
Education EDD012048.007 St John the Baptist Primary
School SLC Building Services Kitchen Extension Phase 1 £527,451.63 09/11/2023
Education EDD012187 Calderwood Primary School Hawthorn Heights Ltd Muga Surface Upgrade £57,980.00 22/11/2023
Housing HOD012244 Telford Road Lock Ups -
Refurbishment
CRD Property Renovations
and Reinstatements Ltd Refurbishment £61,269.86 22/11/2023
99

Page 100

Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Housing HOD012100 Lorne Street Sheltered Housing SLC Building Services Internal Area Upgrade £158,376.08 22/11/2023
Housing HOD011689 Kirkriggs Gardens Landscaping Stepford Contracts Landscaping £70,913.00 23/11/2023
Community
& Enterprise COM012206 Ballgreen Hall Demolition David Morton Larbet Ltd Demolition Works £61,057.50 20/12/2023
Housing HOD012142 Gypsy Site, Springbank Park,
East Kilbride Covanburn Contracts Ltd Perimeter Security Fence and
Groundworks £76,793.20 03/01/2024
Housing HOD012111
Amenity Unit Extension,
Travelling Peoples Site,
Larkhall
Ailsa Building Contractors
Ltd
Internal Refurbishment and
Utility Works £910,274.35 11/01/2024
Social Work SOD012181 SLC HQ - Floor 9 Alterations SLC Building Services Alterations £62,378.00 16/01/2024
Housing
General
Fund
HGF012122 David Walker Gardens Faskin Group Ltd Roof Repairs   £154,331.46 02/02/2024
Housing HOD012092 Newfield, Rutherglen SLC Building Services External Fabric Repairs £808,279.41 06/02/2024
100

Page 101

Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Housing HOD012103 Simpson Court Sheltered
Housing, Uddingston SLC Building Services Internal Area Upgrade £197,370.57 21/02/2024       
101

Page 102

Appendix B 
Contracts Awarded (Procurement Team) 9 September 2023 – 29 February 2024 
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/SW/20/076 1st Stop Accommodation Loretto Care t/a Wheatley
Care 1st Stop Accommodation £201,494.00 19/07/2023
SLC/PS/SW/22/025 Outreach Support Loretto Care t/a Wheatley
Care Outreach Support £142,012.00 19/07/2023
SLC/HT/23/009
Supply, Delivery, Installation and
Maintenance of Bottled Water
Coolers and Mains Fed Coolers  Eden Springs (UK) Ltd
SLC/HT/23/009/A - Lot 1 - Bottled
Water Coolers and Associated
Products
£220,000.00 20/09/2023
SLC/HT/23/009
Supply, Delivery, Installation and
Maintenance of Bottled Water
Coolers and Mains Fed Coolers  Eden Springs (UK) Ltd
SLC/HT/23/009/B - Lot 3 -
Sanitisation and Maintenance of
Bottled and Plumbed-In Water
Coolers
£220,000.00 20/09/2023
SLC/HT/23/099
Supply and Install of Doors and
Windows - Cambuslang, and
Rutherglen  Sidey Solutions Ltd
Supply and Install of Doors and
Windows - Cambuslang, and
Rutherglen
£1,365,401.61 03/11/2023
SLC/HT/23/119 Supply and Install of Doors and
Windows - East Kilbride
CR Smith Manufacturing
Ltd
Supply and Install of Doors and
Windows - East Kilbride £493,894.80 14/11/2023
SLC/HT/23/195 Muga Surface Upgrade 23-24 Hawthorn Heights Ltd Muga Surface Upgrade 23-24 £145,004.00 22/11/2023
SLC/HT/23/210 Mini Competition Strutherhill
Zone C - Roofing Materials Jewson Mini Competition Strutherhill
Zone C - Roofing Materials £154,507.62 22/11/2023
102

Page 103

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/HTR/22/358 Kitchen Canopy Cleaning Perfect Service Solutions
Ltd Canopy Cleaning £181,550.00 23/11/2023
SLC/HT/23/121 Interim Ukrainian Displaced
Persons Accommodation Service
The Salvation Army Trustee
Company
Interim Ukrainian Displaced
Persons Accommodation Service £666,584.00 14/12/2023
SLC/PS/HTR/22/017
Maintenance Of Building Energy
Management System Installations
including Underfloor Heating 
Building Management
Solutions
Maintenance Of Building Energy
Management System
Installations including Underfloor
Heating - Lot 2
£1,380,475.00 15/01/2024
SLC/PS/HTR/22/017
Maintenance Of Building Energy
Management System Installations
including Underfloor Heating  Affiniti Response Ltd
Maintenance Of Building Energy
Management System
Installations including Underfloor
Heating - Lot 4
£1,380,475.00 15/01/2024
SLC/PS/HTR/22/017
Maintenance Of Building Energy
Management System Installations
including Underfloor Heating 
Building Management
Solutions
Maintenance Of Building Energy
Management System
Installations including Underfloor
Heating - Lot 3
£1,380,475.00 15/01/2024
SLC/PS/HTR/22/017
Maintenance Of Building Energy
Management System Installations
including Underfloor Heating  Chartwell Controls Limited
Maintenance Of Building Energy
Management System
Installations including Underfloor
Heating - Lot 1
£1,380,475.00 15/01/2024
SLC/HT/23/038 Maintenance of Fire and Intruder
Alarms Chubb Fire & Security Ltd Maintenance of Fire and Intruder
Alarms £171,426.00 25/01/2024
SLC/HT/23/238 Supply and Delivery of Smoke
Detectors Bemco Ltd Supply and Delivery of Smoke
Detectors £1,455,405.21 25/01/2024
SLC/HT/23/191 Domestic Abuse and Refuge
Services
Women's Aid South
Lanarkshire
Domestic Abuse and Refuge
Services £626,998.50 25/01/2024
103

Page 104

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/HT/23/199
South Lanarkshire Council CCTV
Infrastructure Phase 1 - Supply,
Install and Maintenance of
Cameras 
Racam Security &
Communications Ltd
South Lanarkshire Council CCTV
Infrastructure Phase 1 - Supply,
Install and Maintenance of
Cameras
£142,660.21 02/02/2024
SLC/HT/23/247
Mini Competition under SXL
Framework for Electrical
Materials - Lot 7 - Light Fittings &
Accessories - Our Lady of Lourdes
Primary School 
Bemco Ltd
Mini Competition under SXL
Framework for Electrical
Materials - Lot 7 - Light Fittings &
Accessories - Our Lady of Lourdes
Primary School
£54,394.07 06/02/2024
SLC/HT/23/253
Mini Competition Supply and
Delivery of PV Panels and
Accessories, Shawlands
Crescent, Larkhall
Edmundson Electrical
Limited
Mini Competition Supply and
Delivery of PV Panels and
Accessories, Shawlands
Crescent, Larkhall
£62,123.80 20/02/2024             
104

Page 105

Appendix C 
Contracts Awarded (Building Services) 9 September 2023 – 29 February 2024  
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
BSP012138.007 First Steps Nursery Affiniti Response Ltd Sub-Contract: Joiner works £121,253.25 11/09/2023
BSP012194.002 Our Lady of Lourdes PS Procladd (Small Works) Ltd Sub-Contract: Roof Coverings £255,229.87 05/10/2023
BSP012194.003 Our Lady of Lourdes PS Procladd (Small Works) Ltd Sub-Contract: Rainwater
Cladding £338,882.10 05/10/2023
BSP012194.005 Our Lady of Lourdes PS Carter Ceilings Ltd Sub-Contract: Suspended
Ceilings £76,915.32 13/10/2023
BSP012194.007 Our Lady of Lourdes PS Scottech Limited Sub-Contract: Curtain Walling £225,339.98 13/10/2023
BSP012194.006 Our Lady of Lourdes PS Kentallen Mechanical
Serivces Ltd Sub-Contract: Mechanical £995,027.03 13/10/2023
BSP012194.008 Our Lady of Lourdes PS Joseph Leckie & Sons
(Contracts) Ltd
Sub-Contract: Ground &
Brickworks £310,131.05 23/10/2023
BSP012254.007 St John the Baptist PS Affiniti Response Ltd Sub-Contract: Joiner works £75,684.00 21/11/2023
105

Page 106

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
BSP012254.005 St John the Baptist PS Kentallen Mechanical
Serivces Ltd Sub-Contract: Mechanical £90,000.40 21/11/2023
BSP012194.012 Our Lady of Lourdes PS Boyco (UK) Ltd Sub-Contract: Fixed Furniture £80,044.98 18/12/2023  
106