Agenda Document Pack - Housing and Technical Resources Committee - 07/02/2024

South Lanarkshire Council · 7 February 2024
Back to Housing and Technical Resources Committee — 7 February 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 30 January 2024 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 07 February 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Davie McLachlan (Chair), Margaret Cowie (Depute Chair), Joe Fagan (ex officio), Walter
Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry Convery, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer, Grant Ferguson,
Alistair Fulton, Ross Gowland, Geri Gray, Ross Lambie, Richard Lockhart, Julia Marrs, Ian
McAllan, Kenny McCreary, Norman Rae, David Shearer, Kirsty Williams 
Substitutes
John Bradley, Robert Brown, Poppy Corbett, Gladys Ferguson-Miller, Martin Hose, Cal
Johnston-Dempsey, Susan Kerr, Eileen Logan, Monique McAdams, Richard Nelson, Helen
Toner, Margaret B Walker, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources held on 8
November 2023 submitted for approval as a correct record. (Copy attached) 
5 - 14 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2023 2024 – Housing and Technical
Resources (excl Housing Revenue Account (HRA))
Joint report dated 10 January 2024 by the Head of Finance (Strategy) and
Executive and Executive Director (Housing and Technical Resources). (Copy
attached) 
15 - 20 
4 Revenue Budget Monitoring 2023 2024 – Housing and Technical
Resources (Housing Revenue Account (HRA))
Joint report dated 10 January 2024 by the Head of Finance (Strategy) and
Executive and Executive Director (Housing and Technical Resources). (Copy
attached) 
21 - 24 
5 Capital Budget Monitoring 2023 2024 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 17 January 2024 by the Head of Finance (Strategy) and
Executive and Executive Director (Housing and Technical Resources). (Copy
attached) 
25 - 28 
6 Capital Budget Monitoring 2023 2024 – Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 10 January 2024 by the Head of Finance (Strategy) and
Executive and Executive Director (Housing and Technical Resources). (Copy
attached) 
29 - 32 
7 Housing and Technical Resources - Workforce Monitoring - September to
November 2023
Joint report dated 21 December 2023 by the Head of Finance (Strategy) and
Executive and Executive Director (Housing and Technical Resources). (Copy
attached) 
33 - 38 
Item(s) for Decision 
8 Housing Revenue and Capital Account Budget 2024/2025
Joint report dated 12 January 2024 by the Chief Executive and Executive
Director (Housing and Technical Resources). (Copy attached) 
39 - 48 
9 Housing Allocation Policy – Local Letting Plans 2024/2025
Report dated 11 January 2024 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
49 - 56 
10  South Lanarkshire Council Customer Involvement Strategy 2024 to 2029
Report dated 20 December 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
57 - 86
2

Page 3

11  Homelessness Pressures - Impact and Proposals
Report dated 5 January 2024 by the Executive Director (Housing and Technical
Resources). (Copy attached) 
87 - 94 
12  Lease of Proposed Development - Lanark Community Workshop at Lanark
Racecourse
Report dated 6 December 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
95 - 98 
13  Acquisition of Houses at Jacktonhall, Jackton  (Section 75 Planning
Reference EK-09-0218) and Brackenhill Farm, Hamilton (Section 75
Planning Reference HM-10-0052)
Report dated 14 December 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
99 - 102 
14  Former David Milne Centre, 84 Old Mill Road, Uddingston – Asset Transfer
to Rivals School of Martial Arts
Report dated 10 January 2024 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
103 - 108 
15  Former Hareleeshill Sports Barn, Donaldson Road, Larkhall – Lease to
Rivals School of Martial Arts
Report dated 10 January 2024 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
109 - 114 
16  Former Spittal Community Centre, Carrick Road, Rutherglen and Former
Toll Pitch Community Hall, Hamilton Road, Cambuslang – Lease to The
LEAP Project
Report dated 10 January 2024 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
115 - 120 
Item(s) for Noting 
17  Housing and Technical Resource Plan Quarter 2 Progress Report
2023/2024
Report dated 5 January 2024 by the Executive Director (Housing and Technical
Resources). (Copy attached) 
121 - 150 
18  Delegated Authority Report - Update
Report dated 10 January 2024 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
151 - 154 
Urgent Business 
19  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 8 November 2023 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor Gerry Convery, Councillor
Andrea Cowan, Councillor Margaret Cowie (Depute), Councillor Maureen Devlin, Councillor Colin
Dewar, Councillor Grant Ferguson, Councillor Alistair Fulton, Councillor Ross Gowland, Councillor
Geri Gray, Councillor Ross Lambie, Councillor Richard Lockhart, Councillor Eileen Logan (substitute
for Councillor Kirsty Williams), Councillor Julia Marrs, Councillor Ian McAllan, Councillor Kenny
McCreary, Councillor Norman Rae, Councillor David Shearer, Councillor Margaret B Walker
(substitute for Councillor Allan Falconer) 
Councillors' Apologies:
Councillor Walter Brogan, Councillor Janine Calikes, Councillor Margaret Cooper, Councillor Joe
Fagan (ex officio), Councillor Allan Falconer, Councillor Kirsty Williams 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Resources); H Calley, Administration Officer; M Lunny, Legal Services
Adviser; E Maxwell, HR Business Manager; D McMillan, Accountant; L O’Hagan, Finance Manager
(Strategy); L Wyllie, Administration Assistant
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services; J Forbes, Head of Property
Services; G McParland, Property Manager (Assets and Estates); C Mitchell, Strategy and Support
Manager; J Read, Strategy and Policy Adviser 
Chair’s Opening Remarks
The Chair referred to the appointment of Councillor Cowie as Depute Chair of this Committee and
thanked the outgoing Depute Chair, Councillor Lennon, for his contribution to the work of the
Committee. 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Housing and Technical Resources Committee held on 30
August 2023 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.
2
5

Page 6

3 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 11 October 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April to 8 September 2023
for Housing and Technical Resources (excl HRA). 
As at 8 September 2023, there was a breakeven position against the phased budget. 
Virements were proposed to realign budgets and those were detailed in appendices B and C to
the report. 
The Committee decided: 
(1) that the breakeven position as at 8 September 2023 on Housing and Technical Resources’
(excl HRA) Revenue Budget, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 30 August 2023 (Paragraph 5) and Minutes of the Executive Committee
of 11 October 2023 (Paragraph 3)] 
4 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 11 October 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April to 8 September 2023
for Housing and Technical Resources (HRA). 
As at 8 September 2023, there was a breakeven position against the phased budget. 
The Committee decided: that the breakeven position on Housing and Technical
Resources’ (HRA) Revenue Budget, as detailed in
Appendix A of the report, be noted. 
[Reference: Minutes of 30 August 2023 (Paragraph 6) and Minutes of the Executive Committee
of 11 October 2023 (Paragraph 3)] 
5 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 18 October 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of progress on the
capital programme for Housing and Technical Resources (excl HRA) for the period 1 April to 8
September 2023. 
The revised budget for Housing and Technical Resources was £12.258 million.  On 13
September 2023, the Executive Committee agreed changes to the Programme totalling a net
increase of £0.335 million as detailed in Appendix A of the report. 
Anticipated spend for the period was £1.364 million and spend to 8 September 2023 amounted
to £1.297 million.  This represented an underspend of £0.067 million which was due to a timing
issue only.
6

Page 7

The Committee decided: that the Housing and Technical Resources’ (excl HRA)
capital programme of £12.258 million and expenditure for
the year of £1.297 million, be noted. 
[Reference: Minutes of 30 August 2023 (Paragraph 9) and Minutes of the Executive Committee
of 13 September 2023 (Paragraph 6)] 
6 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 11 October 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of progress on the
capital programme for Housing and Technical Resources (HRA) for the period 1 April to 8
September 2023. 
The budget was based on the revised capital programme for the year which had been approved
by the Executive Committee on 16 August 2023. 
The Housing capital programme for 2023/2024 totalled £69.596 million and was detailed, along
with the funding sources, in Appendix A of the report. 
Actual expenditure to 8 September 2023 was £19.378 million.  This was £1.920 million behind
programme and was due to a number of external fabrics projects being behind programme due
to projects requiring to be reprogrammed to take account of new, more effective procurement
routes and delays requiring further consideration of technical options for some works. 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £69.596 million and expenditure to 8
September 2023 of £19.378 million, be noted. 
[Reference: Minutes of 30 August 2023 (Paragraph 10), Minutes of the Executive Committee of
16 August 2023 (Paragraph 4) and 11 October 2023 (Paragraph 4)] 
7 Housing and Technical Resources – Workforce Monitoring – July and August
2023
A joint report dated 14 September 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted on the following employee
information for Housing and Technical Resources for July and August 2023:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 10 June 2023 
The Committee decided: that the report be noted. 
[Reference: Minutes of 30 August 2023 (Paragraph 11)]
7

Page 8

8 South Lanarkshire Council's Strategic Housing Investment Plan 2024 to 2029
A report dated 23 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted:- 
 requesting approval for South Lanarkshire Council’s Strategic Housing Investment Plan
(SHIP) 2024 to 2029
 providing an update on additional considerations given as part of the development of
South Lanarkshire Council’s SHIP 2024 to 2029 
The SHIP identified affordable housing development priorities within the local authority area to
guide the way in which Scottish Government funding and other resources were allocated to
achieve current South Lanarkshire Local Housing Strategy (LHS) 2022 to 2027 outcomes. 
Local authorities were required to update the SHIP on an annual basis with sites added,
removed or revised as appropriate.  The most recent SHIP, which covered the period from 2023
to 2028, had been approved by this Committee on 5 October 2022. 
The LHS 2022 to 2027 had been approved at the Executive Committee on 30 November 2022
and highlighted a commitment by the Council and its partners to actively seek opportunities to
develop housing across South Lanarkshire to meet housing need and support social and
economic regeneration. 
On 30 November 2022, the Executive Committee also approved a new affordable housing
supply target for the Council, aimed at delivering an additional 1,300 homes by 31 March 2027. 
This would be delivered through a combination of new council homes and the acquisition of
existing homes from the market, with the new sites set out within the SHIP. 
The SHIP 2024 to 2029 had been developed by:- 
 maximising opportunities to bring forward town centre and existing Council or community
planning partner-owned sites to assist in achieving the Council’s new 1,300 additional
homes target
 maximising opportunities to bring forward private sites through utilising new procurement
routes for developers to build relationships with the Council to assist with longer term
development planning
 continued alignment with the South Lanarkshire Health and Social Care Partnership to
ensure appropriate current and future housing provision for those with particular needs
 alignment with relevant aspects of the new National Planning Framework 4 (NPF4) to
ensure new housing developments contributed to and enhanced existing neighbourhoods 
Continued engagement had also taken place with developing Registered Social Landlord (RSL)
partners along with consultation with internal partners, which this year had been extended to
elected members with a special session held on 31 August 2023.  Engagement had also taken
place with the Tenant Participation Co-ordination Group (TPCG). 
The Council had submitted the draft SHIP to the Scottish Government on 28 October 2023.  The
submission highlighted that the document was still in draft form and subject to approval by this
Committee.  Following approval by this Committee, the document would be published on the
Council’s website. 
The draft SHIP and associated table of priority sites was detailed in Appendix 1 to the report. 
The document had been updated in line with national guidance and provided a detailed context
and rationale for the priorities which would be delivered over the 5-year period to March 2029. 
Table 1, annexed to the SHIP, set out priorities for grant funding to be delivered over the rolling
5-year period and included projects with a total potential capacity for delivering up to 2,442
affordable homes in South Lanarkshire over the 5-year period to March 2029.  
8

Page 9

As detailed in the report, a range of key considerations had been made as part of the
development of this year’s SHIP to ensure alignment with a range of Council priorities which
included town centre regeneration and appropriate provision of housing for those with particular
needs. 
The assumptions and forecasts set out in the SHIP were based on the best information available
at the time of preparation and would be subject to refinement as part of the annual review of the
SHIP and preparation of the Strategic Local Programme Agreement (SLPA) as individual
projects were developed.  In accordance with the guidance, this annual agreement would
continue to be reviewed and refreshed annually in consultation with the Scottish Government
and RSL partners. 
The Scottish Government’s More Homes Division would collate the South Lanarkshire SHIP into
a national programme for ministerial approval and thereafter, the SLPA would be prepared for
sign off by each local authority. 
Once the SLPA was finalised, the Scottish Government would issue individual programme
agreements for RSL and Council projects covering the units, tenure mix, subsidy levels, site
start and completion dates, as those came forward.  Monitoring and review of the delivery
programme by the Council, its RSL partners and the Scottish Government would take place on
an ongoing basis throughout the year. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Council’s Strategic Housing Investment Plan 2024 to 2029, as detailed in
Appendix 1 to the report, be approved for publication and submitted to the Scottish
Government; and 
(2) that the key considerations made as part of the development of the Council’s Strategic
Housing Investment Plan 2024 to 2029 be noted. 
[Reference:  Minutes of 5 October 2022 (Paragraph 11) and Minutes of the Executive
Committee of 30 November 2023 (Paragraph 7)] 
9 Policy and Strategy Review Schedule
A report dated 18 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval for the Policy and Strategy Review Schedule for Housing
and Technical Resources. 
The Policy and Strategy Review Schedule was established in 2011 with regular updates
provided, most recently on 14 December 2022.  It assisted annual service planning by providing
a timeframe for the formal review of all key housing policies and strategies.  It informed the
development of the annual work plan for customer involvement and provided a basis for the
Council to ensure that its statutory obligations were delivered. 
The proposed Schedule reflected changes in the local and national policy context and was
attached as Appendix 1 to the report.  It included review dates that had been revised to take
account of the work underway within the Resource to introduce a new Housing and Property
Management system and the associated demands placed on staff resources.  It set out:- 
 details of housing policies and strategies 
 the frequency of reviews
 when the reviews were next scheduled to take place
9

Page 10

As part of the policy and strategy review process, associated procedures and protocols, which
supported the delivery of services, were also considered and reviewed as appropriate.  This
ensured that scope for service improvements was also considered as part of the review process. 
The scope of the policy and strategy areas covered by the Schedule was consistent with the key
service areas identified by the Scottish Housing Regulator’s regulatory framework, as detailed in
the report. 
In addition, the review also incorporated key housing and other strategies which the Resource
had lead responsibility for within the Council. 
The Schedule would inform the next round of Resource and Service Plans for 2024/2025 and
would be used to establish a joint programme for customer engagement. 
The proposed frequency of review was considered appropriate to the individual policy or
strategy area.  An updated Schedule would be presented to this Committee on an annual basis
which would advise of progress and any amendments to the Schedule. 
The Committee would continue to be fully updated in relation to the development of the specific
policies and strategies contained within the Schedule. 
The Committee decided: 
(1) that the Policy and Strategy Review Schedule, attached as Appendix 1 to the report, be
approved; and 
(2) that the outcome of policy and strategy reviews be reported to future Committees, in line
with the Schedule. 
[Reference: Minutes of 14 December 2022 (Paragraph 10)] 
10 Laundry Facilities – Introduction of Charging 2024/2025
A report dated 18 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted on a proposal for the introduction of laundry charges across relevant high rise
flats from 1 April 2024. 
The Council owned a total of 21 high rise blocks in East Kilbride, Hamilton and Cambuslang. 
Laundry facilities for tenants and residents were available within 9 high rise blocks and 1 low
rise block of flats and included washing machines, spinners and driers.  In East Kilbride, 3
blocks had laundry facilities charged at a nominal fee.  In Hamilton and Cambuslang, 6 high rise
blocks and 1 low rise block had similar laundry facilities which, in the past, had been free to use
by tenants and residents.  The remaining 12 high rise blocks had no laundry facilities. 
As charging arrangements were not consistent, an appraisal had been undertaken which
identified the need to introduce a standardised charging arrangement.  This would address the
inequity of the current position in East Kilbride and service-wide as the cost of the service would
be borne across all Council tenants rather than by those directly using the service. 
Standardising charges for washing and drying facilities would generate income to the Council to
meet the significant and increasing costs of equipment, electricity, maintenance and ad-hoc
repairs.  The proposed level of charge had been developed to reflect the costs associated with
the use and maintenance of the equipment.  The introduction of charging was only applicable to
those blocks with existing laundry facilities. 
10

Page 11

A benchmarking comparison with 3 local laundrettes was detailed in Table 1, with the estimated
annual income detailed in Table 2 within the report.   
Following approval by this Committee, a programme of engagement with those affected tenants
and residents would be undertaken prior to the introduction of charging from 1 April 2024. 
The Committee decided: 
(1) that the introduction of laundry charges, as detailed in section 4 of the report, from 1 April
2024, be approved; and 
(2) that it be noted that a programme of engagement with tenants and residents would be
undertaken on the introduction of charging. 
11 Acquisition of 6 Houses at Tenter Place and Lampmaker Drive, Hamilton
A report dated 11 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted requesting approval to acquire 6 houses at Tenter Place and Lampmaker Drive,
Hamilton from Lovell Homes. 
On 30 November 2022, the Executive Committee approved the revised Council Housing Supply
Programme target of 1,300 additional homes to increase the total number of council homes in
South Lanarkshire by March 2027.  It was noted within the report to that Committee, that this
would be achieved through a flexible combination of new homes, built on behalf of the Council
on existing Council owned land, new homes purchased ‘off the shelf’ from housing developers
and the acquisition of suitable existing homes. 
Through the ongoing redevelopment of the former Philips factory site at Wellhall Road,
Hamilton, Lovell Homes was building a total of 163 houses.  As part of the Section 75 Planning
Agreement for the development, Lovell Homes was providing 40 houses to the Council through
a Turnkey arrangement. 
An opportunity had arisen for the Council to acquire an additional 6 ‘off the shelf’ units within the
current calendar year.  The houses comprised four, 3-bedroom semi-detached and two, 3-
bedroom townhouses.  Those units would help increase supply and meet housing need in a high
pressure area.  The Council was already acquiring units within the development as part of the
Section 75 Agreement and therefore, there would be an existing management presence within
the immediate locality. 
The properties had been assessed as being in an area of housing need and the properties were
of a size and type that the Council had demand for.  The acquisitions presented the Council with
an opportunity to deliver additional housing more quickly than through its ongoing new build
programme as planning consent had already been granted and development was nearing
completion.  It was highlighted that the proposed acquisition of the 6 units was an entirely
separate transaction from the previous transaction for 40 houses which were being acquired
pursuant to planning obligations in the Section 75 Agreement. 
The acquisitions would be eligible for Scottish Government Affordable Housing Grant funding
and an assessment of the market value of the houses confirmed that the proposed price
represented good value for money. 
Therefore, it was proposed to acquire the 6 properties at Tenter Place and Lampmaker Drive,
Hamilton from Lovell Homes subject to the following principal conditions:- 
 the purchase price to be £1,306,000, exclusive of VAT, which would be payable on the
date of entry
11

Page 12

 the date of entry to be upon completion
 each party to be responsible for their own legal fees 
The Committee decided: 
(1) that 6 houses at Tenter Place and Lampmaker Drive, Hamilton, be acquired from Lovell
Homes for the total sum of £1,306,000, exclusive of VAT, for addition to the Council’s
housing stock; and 
(2) that the Executive Director (Housing and Technical Resources), in consultation with the
Head of Administration and Legal Services, be authorised to conclude all other matters
pertaining to the acquisition of the properties and to enter into the necessary legal
agreements on terms which were in the best interests of the Council. 
[Reference: Minutes of the Executive Committee of 30 November 2022 (Paragraph 7)] 
12 Annual Report - Mainstreaming Equality and Diversity within Housing and
Technical Resources
A report dated 10 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted providing an overview of progress made in relation to mainstreaming equalities
within Housing and Technical Resources during 2022/2023 and highlighting the key actions
being progressed during 2023/2024. 
The Housing and Technical Resources’ Equality and Diversity Co-ordinating Group continued to
progress the Equality and Diversity work plan and support a consistent approach to
mainstreaming equality and diversity across the Resource. 
Details were provided on progress made in meeting those commitments during 2022/2023 and
the key priorities for 2023/2024 were outlined. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: that the progress made during 2022/2023 and key actions
for 2023/2024 in relation to mainstreaming equalities be
noted. 
[Reference: Minutes of 14 December 2022 (Paragraph 17)] 
13 Annual Report on the Charter (ARC) 2022/2023
A report dated 29 September 2023 by the Executive Director (Housing and Technical
Resources) was submitted providing an update on:- 
 the Scottish Social Housing Charter and the requirement to produce an Annual Report on
the Charter (ARC) covering performance during 2022/2023
 arrangements to monitor and report on Charter progress throughout 2023/2024 
The Charter contained 32 measures of performance which reflected a mixture of qualitative,
survey-based information as well as a range of efficiency and effectiveness measures.  To
comply with the requirements set out by the Scottish Housing Regulator (SHR), the Resource
submitted its 2022/2023 performance information to the Regulator on 26 May 2023. 
12

Page 13

The Charter report was consistent with those of previous years and a summary, attached as
Appendix 1 to the report, provided further details on each indicator together with a comparison
against the Scottish average for all social landlords and that of the other Scottish local authority
landlords.  There were 7 indicators where performance had improved in the last year, details of
which were included in the report along with a summary of the position and context in relation to
5 indicators where performance had reduced. 
A key objective of the Charter process was to ensure robust scrutiny and consideration of the
performance of landlords.  As trends emerged, the comparative aspect of performance with
others would inform and reflect on areas for future tenant and service user scrutiny and potential
areas for service improvement. 
The Resource Plan 2023/2024, which included the majority of the Charter indicators, would
continue to be monitored and reported as part of the 6-monthly update to the Committee. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Council’s reported performance and contextual information for the Scottish Social
Housing Charter and comparisons with other landlords, as detailed at Appendix 1 of the
report, be noted; and 
(2) that the future use of the Charter for ongoing scrutiny by the Scottish Housing Regulator
(SHR), tenants and other service users, be noted. 
[Reference: Minutes of 5 October 2022 (Paragraph 14)] 
14 Update of the Housing and Technical Resources' Risk Register and Risk Control
Plan
A report dated 10 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted providing an update on the Housing and Technical Resources’ Risk Register and
Risk Control actions. 
Housing and Technical Resources had followed Council guidance in developing, monitoring and
updating its Risk Control Register on an ongoing basis.  The Register had been developed to
ensure that the Resource:- 
 was fully aware of the top risks 
 was able to prioritise those risks 
 had controls in place to eliminate or minimise the impact of the risk 
The risks were scored in accordance with the Council’s scoring mechanism based on likelihood
and impact of risk.  This resulted in risks being scored between 1 to 25 (low to very high).  Risks
were scored on their inherent risk (risk if nothing was done) and their residual risk (risk after
applying controls).  The Council’s scoring matrix was attached as Appendix 1 to the report. 
The Risk Register for the Resource had been developed and was monitored on an ongoing
basis by the Resource Risk Management Group to add new risks and to review the score of
existing risks.  The main changes to the Risk Register, including 5 new risks, were summarised
in the report. 
Details of all risks which had scored very high and high were provided in Appendix 2 to the
report.  Risks evaluated as being medium or low risk would be monitored to ensure that they
continued to be adequately managed.
13

Page 14

Appendix 3 to the report provided a comparison of risk scores for 2022 and 2023.  This
appendix also detailed changes in risk descriptions. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the contents of the Resource Risk Register be noted; and 
(2) that it be noted that risk control actions would continue to be progressed by relevant
officers. 
[Reference: Minutes of 14 December 2022 (Paragraph 16)] 
15 Notification of Contracts Awarded - 1 April to 8 September 2023
A report dated 15 September 2023 by the Executive Director (Housing and Technical
Resources) was submitted on contracts awarded by Housing and Technical Resources, valued
in excess of £50,000, in the period 1 April to 8 September 2023, as follows:- 
 contracts awarded by Consultancy Services
 contracts awarded by the Procurement Team
 sub contracts awarded by Building Services 
Details of the contracts and projects were provided in the appendices to the report. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the contracts awarded by Consultancy Services, as detailed in Appendix A to the
report, be noted; 
(2) that the contracts awarded by the Procurement Team, as detailed in Appendix B to the
report, be noted; and 
(3) that the sub contracts awarded by Building Services, as detailed in Appendix C to the
report, be noted. 
[Reference: Minutes of 31 May 2023 (Paragraph 10)] 
16 Urgent Business 
There were no items of urgent business.
14

Page 15

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Head of Finance (Strategy)  
Executive Director (Housing and Technical Resources) 
Subject: Revenue Budget Monitoring 2023/2024 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 1 December 2023 for Housing and Technical
Resources (excl Housing Revenue Account (HRA))
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position as at 1 December 2023 on Housing and Technical
Resources’ (excl HRA) revenue budget and the forecast to 31 March 2024 of
a breakeven position after approved transfers to reserves, as detailed in
Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved
[1recs]
3. Background
3.1. This is the third revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) on Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. Probable Outturn: Following the Council’s formal probable outturn exercise, the
forecast for the budget to 31 March 2024 is a breakeven position after approved
transfers to reserves of £1.510 million.  This is made up of overspends in the Estates
and Property Maintenance services, offset by an underspend in Office
Accommodation. 
5.2. As at 1 December 2023, there is a breakeven position against the phased budget. 
3
15

Page 16

6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed.  In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
we have mitigated this through providing additional funds in future years budget
strategy and in this year, through some reserve funds available. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Head of Finance (Strategy) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 24 January 2024 
List of Background Papers
 Financial ledger and budget monitoring results to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Graham.Booth@southlanarkshire.gov.uk
16

Page 17

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 1 December 2023 (No.9) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
01/12/23
Actual
01/12/23
Variance
01/12/23 
%
Variance
01/12/23 Notes            
Budget Category            
Employee Costs 50,063  48,205 1,858  32,470  31,204 1,266 under 3.9% 
Property Costs 19,319  21,038  (1,719)  14,238  15,341 (1,103) over (7.7%) 
Supplies & Services 13,832  14,010  (178)  8,310  8,504 (194) over (2.3%) 
Transport & Plant 4,723  4,408  315  2,959  2,778 181 under 6.1% 
Administration Costs 3,754  3,734  20  427  557 (130) over (30.4%) 
Payments to Other Bodies 8,600  8,625 (25)  4,216  4,198 18 under 0.4% 
Payments to Contractors 12,865 12,625 240  7,342  6,960 382 under 5.2% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  181 (27)  19 20 (1) over (5.3%) 
Total Controllable Exp. 113,310  112,825 485  69,981  69,562 419 under 0.6% 
Total Controllable Inc. (95,718) (96,743) 1,025 (49,743) (49,324) (419) under
recovered (0.8%) 
Net Controllable Exp. 17,582  16,082  1,510 20,238  20,238 0  - 0.0% 
Transfer to Reserves as
at (01/12/23) 0  1,510  (1,510)  0  0  0  -   
Position After Transfers
to Reserves (01/12/23) 17,592  17,592 0  20,238  20,238 0  - 0.0% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate. 
Approved Transfers to Reserves 
Detailed in Appendix B and C 
17

Page 18

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 1 December 2023 (No.9) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
01/12/23
Actual
01/12/23
Variance
01/12/23 
%
Variance
01/12/23 Notes            
Budget Category            
Employee Costs 4,034  4,016  18  2,546  2,521 25 under 1.0% a
Property Costs 6,638  7,305  (687)  4,665  5,147 (482) over (10.3%) 1, b,
c
Supplies & Services 217  212  5  132  140 (8) over (6.1%) 
Transport & Plant 194  154  40  147 125 22 under 15.0% 
Administration Costs 156  145  11  57 61 (4) over (7.0%) 
Payments to Other Bodies 4,728  4,626  102  2,860  2,789 71 under 2.5% 
Payments to Contractors 2,709  2,468  241  1,466 1,299 167 Under 11.4% 2
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  20  (9)  2 2 0  - 0.0% 
Total Controllable Exp. 18,687  18,946  (259)  11,875  12,084 (209) over (1.8%) 
Total Controllable Inc. (8,458) (10,274) 1,816  (5,546) (5,803) 257 over
recovered 4.6% 3, c,
d
Net Controllable Exp. 10,229  8,672  1,557  6,329  6,281 48  under 0.8% 
Transfer to Reserves as
at (01/12/23) 0  1,485 (1,485)  0  0  0  -   
Position After Transfers
to Reserves (01/12/23) 10,229  10,157  72  6,329  6,281 48  under 0.8% 
Variance Explanations 
1. The overspend relates to the cost of works on temporary accommodation to meet current demand.
2. The underspend relates to commissioned services in the homelessness budget where expenditure varies according to service requirements.
3. The over recovery relates mainly to rent from temporary accommodation stock. 
Budget Virements 
a. Incorporation of additional pay award. Net Effect £0.180m: Employee Costs £0.180m.
b. Transfer of budget from centre for utilities. Net Effect £0.100m, Property Costs £0.100m.
c. Realignment of budget within Homelessness. Net Effect £0.000m: Property Costs £0.305m and Income (£0.305m).
d.  Funding from Scottish Government for Ukraine Resettlement Funding. Net Effect £1.485: Income £1.485m. 
Approved Transfers to Reserves (£1.485m): 
i. Ukraine Resettlement Funding.  (£1.485m) 
18

Page 19

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 1 December 2023 (No.9)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
01/12/23
Actual
01/12/23
Variance
01/12/23 
%
Variance
01/12/23 Notes            
Budget Category            
Employee Costs 46,029  44,189 1,840  29,924 28,683 1,241 under 4.1% 1, a
Property Costs 12,681  13,733  (1,052)  9,573 10,194 (621) over (6.5%) 2, a,
b
Supplies & Services 13,615  13,798  (183)  8,178 8,364 (186) over (2.3%) 3, c
Transport & Plant 4,529  4,254  275  2,812 2,653 159 under 5.7% 4
Administration Costs 3,598 3,589  9  370 496 (126) over (34.1%) 
Payments to Other Bodies 3,872 3,999 (127)  1,356 1,409 (53) over (3.9%) d
Payments to Contractors 10,156 10,157 (1)  5,876 5,661 215 under 3.7% 5, e
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143 161 (18)  17 18 (1) over (5.9%) 
Total Controllable Exp. 94,623 93,880 743  58,106 57,478 628 under 1.1% 
Total Controllable Inc. (87,259) (86,469) (790)  (44,197) (43,521) (676) under
recovered (1.5%) 6, a,
e
Net Controllable Exp. 7,364  7,411  (47)  13,909 13,957 (48)  over 0.3% 
Transfer to Reserves as
at (01/12/23) 0  25  (25)  0  0  0  -   
Position After Transfers
to Reserves (01/12/23) 7,364  7,436  (72)  13,909 13,957 (48)  over 0.3% 
Variance Explanations 
1. The variance relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are determined.
2. The overspend relates primarily to service charges within the estates service.
3. The level of expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue
works.
4. The level of expenditure on scaffolding, plant and other transportation costs varies depending on the current workload demands and timing of works on a
wide variety of capital and revenue works.
5. The use of private contractors varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
6. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
a. Incorporation of additional pay award. Net Effect £0.645m: Employee costs £2.864m, Property Costs £0.181m and Income (£2.400m).
b. Transfer of budget from centre for utilities. Net Effect £0.362m, Property Costs £0.362m.
c. Transfer to centre to reflect achievement of procurement savings. Net Effect (£0.384m): Supplies and Services (£0.384m).
d. Transfer from CFCR in respect of Private Sector Housing Scheme of Assistance. Net Effect £1.000m: Payment to Other Bodies £1.000m.
e. Realignment of budget within Building Services. Net Effect £0.000m: Payments to Contractors (£3.000m) and Income £3.000m. 
Approved Transfers to Reserves (£0.025m): 
i) Local Heat and Energy Efficiencies Strategies (LHEES).  (£0.025m) 
19

Page 20

20

Page 21

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Head of Finance (Strategy)  
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2023/2024 - Housing and
Technical Resources (Housing Revenue Account (HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 1 December 2023 for Housing and Technical
Resources (Housing Revenue Account (HRA))
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report and the forecast to 31
March 2024 of a breakeven position be noted, and
(2) that the proposed budget virements be approved 
3. Background
3.1. This is the third revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Housing and Technical Resources HRA
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. Probable Outturn: Following the Council’s formal probable outturn exercise, the
forecast for the budget to 31 March 2024 is a breakeven position. 
5.2. This breakeven position includes a lower than budgeted Transfer from Reserves
being required in the financial year.  It is assumed that the increased level of costs
experienced will be offset by an underspend in Loan Charges this financial year. 
5.3. A reduction in spend on Loan Charges is anticipated in 2023/2024 from utilising an
in-year benefit from the HRA Loans Fund Review.  This work has been carried out
and forms part of the 2024/2025 budget setting report for the HRA to this Committee
(Housing Revenue and Capital Account Budget 2024/2025). 
4
21

Page 22

5.4. As at 1 December 2023, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed.  In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
these pressures are assessed and managed within the budget planning exercise for
current and future years. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Head of Finance (Strategy) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 24 January 2024 
List of Background Papers
 Financial ledger and budget monitoring results to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Graham.Booth@southlanarkshire.gov.uk
22

Page 23

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 1 December 2023 (No.9) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
01/12/23
Actual
01/12/23
Variance
01/12/23 
%
Variance
01/12/23 Notes            
Budget Category            
Employee Costs 15,310  15,401  (91)  10,015 10,054 (39) over (0.4%) a
Property Costs 50,929  56,610  (5,681)  29,002  32,968 (3,966) over (13.7%) 1
Supplies & Services 653  691  (38)  478  488 (10) over (2.1%) b
Transport & Plant 196  189  7  130 121 9 under 6.9% 
Administration Costs 5,570  5,597  (27)  363 378 (15) over (4.1%) 
Payments to Other Bodies 2,974  2,979  (5)  1,395  1,401 (6) over (0.4%) 
Payments to Contractors 100  145  (45)  62  62 0 - 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 27,162  27,162  0  24,390  24,390 0 - 0.0% 
Total Controllable Exp. 102,894  108,774  (5,880)  65,835  69,862 (4,027) over (6.1%) 
Total Controllable Inc. (115,940) (116,768) 828  (70,811) (71,086) 275 over
recovered 0.4% 2
Transfer to/(from) Balance
Sheet (4,907) (853) (4,054)  (2,093) 0 (2,093) under
recovered (100.0%) 3
Net Controllable Exp. (17,953) (8,847) (9,106)  (7,069) (1,224) (5,845)  over (82.7%) 
Loan Charges 17,953  8,847  9,106  5,845  0  5,845  under (100.0%) 4, a,
b
Net Controllable Exp. 0  0  0  (1,224) (1,224) 0  - 0.0% 
Variance Explanations 
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.
3. The net combined overspend requires for a lower than budgeted level of transfer from reserves at this time.
4. The underspend is due to a reduction in spend on Loan Charges anticipated from utilising an in-year benefit from the Housing Revenue Account Loans
Fund Review.   
Virements 
a. Realignment of budget to fund the anticipated increase in employee costs due to pay award. Net Effect £0: Employee Costs £1.057m and Loan Charges
(£1.057m).
b. Realignment of budget to fund the anticipated costs associated with IT system development. Net Effect £0: Supplies and Services £0.220m and Loan
Charges (£0.220m). 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Head of Finance (Strategy)  
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl Housing Revenue Account (HRA)) for the period 1 April
to 1 December 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources’ (excl HRA) capital programme of
£11.488 million and expenditure to date of £1.988 million, be noted; and
(2) that the projected outturn of £8.800 million be noted.
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2023/2024.  Further reports will follow
throughout the year. 
3.2. The revised budget for Housing and Technical Resources is £11.488 million.  This
reflects the budget of £12.258 million reported to the last meeting of this Committee in
November 2023, adjusted to reflect changes totalling a net decrease of £0.770 million
which were approved by the Executive Committee on 22 November 2023 (£0.230m
increase) and 24 January 2024 (£1.000 million decrease).  The details of these
amendments are shown in Appendix A. 
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2023/2024 Budget   
The total capital programme for Housing and Technical Resources is £11.488 million,
as detailed in Section 3.2.   
5
25

Page 26

5.2. 2023/2024 Outturn
Work has been ongoing to monitor the predicted spend position for this financial year
and current estimates from the Resource suggest an outturn of £8.800 million, an
underspend of £2.688 million.  This mainly reflects the anticipated timing of spend on
a number of multi-year projects, resulting in budget required in 2024/2025 rather than
2023/2024. 
5.3. The projects which will now underspend in 2023/2024 include Prioritised Urgent
Investment Programme and Lifecycle Replacement – Schools.  Funding for these
projects will carry forward into next financial year.   
5.4.  Period 9 Position   
The anticipated spend to date was £2.238 million and spend to 1 December 2023
amounts to £1.988 million, an underspend of £0.250 million.  This reflects the timing
of project spend on the demand-led Prioritised Urgent Investment Programme being
less than anticipated at this time. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment Management meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required.   
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Head of Finance (Strategy) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
17 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 8 November 2023
 Executive Committee, 22 November 2023
 Executive Committee, 24 January 2024 
List of Background Papers
26

Page 27

 Financial ledger to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
27

Page 28

Appendix A 
South Lanarkshire Council
Capital Expenditure 2023-24
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2023 – 1 December 2023 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000
Asset Management
Programmes 10,636 299 0 10,935  2,068 1,829
Private Housing Scheme of
Assistance 1,000 (1,000) 0 0  0 0
Other Housing 163 390 0 553  170 159
TOTAL 11,799 (311) 0 11,488  2,238 1,988 
For Information Only  
Budget Adjustments approved by Executive Committee, 22 November 2023:  Budget Adjustments approved by Executive Committee, 24 January 2024: 
Budget Adjustments 
Central Energy Efficiency Fund  
Total Budget Adjustments             
£0.230m 
£0.230m
Budget Adjustments 
Private Housing Scheme of Assistance 
Total Budget Adjustments 
(£1.000m) 
(£1.000m) 
28

Page 29

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Head of Finance (Strategy)  
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing and
Technical Resources (Housing Revenue Account (HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (Housing Revenue Account (HRA)) for the period 1 April to
1 December 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources’ (HRA) capital programme
of £67.443 million and expenditure to 1 December 2023 of £33.973 million, be
noted 
3. Background
3.1. This is the third capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2023/2024.   
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 24 January 2024. 
3.3. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2023/2024 totals £67.443 million and is detailed
along with the funding sources at Appendix A to this report.   
5.2. Actual expenditure to 1 December 2023 is £33.973 million.  This is £0.658 million
ahead of programme and is due to the number of buy backs through the open market
purchase scheme being ahead of programme to date. 
5.3. Current estimates suggest an outturn of £67.443 million.  The Resource is expecting
to spend to this level and work will continue in the coming months to deliver spend. 
6
29

Page 30

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through 4-weekly
Investment Management meetings. 
7.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact on the supply chain for the foreseeable future.  The impact will continue to be
monitored through the 4-weekly Investment Management meetings.  Further updates
will be reported in the coming months with any significant increases in contract values
being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore, no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Head of Finance (Strategy) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, effective, efficient and transparent 
Previous References
▪ Executive Committee, 24 January 2024 
List of Background Papers
▪ Financial ledger to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
30

Page 31

South Lanarkshire Council       Appendix A
Housing Capital Programme 2023/24
As at 1 December 2023 
£m £m
Anticipated Capital Expenditure 2023/24   67.443
Estimated Financing Position 2023/24   
Capital Receipts  1.683  
Capital Financed From Current Revenue 27.162  
Prudential Borrowing 23.166  
Specific Grant – Scottish Government New Council Houses 10.048  
Specific Grant – Scottish Government Buy Backs 5.264  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
67.443 
Actual Expenditure to 1 December 2023  33.973 
Actual Financing Position to 1 December 2023   
Capital Receipts  1.919  
Capital Financed From Current Revenue 24.385  
Prudential Borrowing 0.000  
Specific Grant – Scottish Government New Council Houses 7.538  
Specific Grant – Scottish Government Buy Backs 0.000  
Specific Grant – Scottish Government Mortgage to Rent 0.131  
Other Income 0.000        
33.973 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Head of Finance (Strategy)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – September to November 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for September to November 2023 relating to
Housing and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for September to November 2023
relating to Housing and Technical Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 9 September 2023 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for September to
November 2023. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of November 2023 for
Housing and Technical Resources. 
The Resource absence figure for November 2023 was 5.6%, this figure has
increased by 0.6% when compared to last month and is 0.6% lower than the
Council-wide figure.  Compared to November 2022, the Resource absence figure
has decreased by 0.3%. 
Based on the absence figures at November 2023 and annual trends, the projected
annual average absence for the Resource for 2023/2024 is 5.7% compared to a
Council-wide average figure of 5.4%. 
7
33

Page 34

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services works in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall 190 referrals were made this period.  This represents an
increase of 27 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 10 accidents/incidents recorded within the Resource this period, this
figure remains unchanged when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 1 disciplinary hearing was held within the Resource, this figure
remains unchanged when compared to the same period last year.  During this period
no appeals were heard by the Appeals Panel.  Three Appeals Panels were pending,
an increase of 3 when compared to the same period last year.  One grievance was
raised within the Resource, this figure has increased by 1 when compared to the
same period last year.  One Dignity at Work complaint was raised within the
Resource, this figure remains unchanged when compared to the same period last
year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 19 leavers in the Resource this period eligible for an exit
interview.  This figure has increased by 7 when compared with the same period last
year.  Four exit interviews were conducted in this period, a decrease of 2 when
compared with the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period September to November 2023, 37
employees (31.62 FTE) in total left employment, managers indicated that 33 posts
(27.91 FTE) were being replaced, 2 posts (1.71 FTE) were due to end of fixed term
contracts and 2 posts (2.00 FTE) are being held pending service reviews. 
5. Staffing Watch
5.1. There has been a decrease of 2 in the number of employees in post from 10 June
2023 to 9 September 2023. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
34

Page 35

7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Head of Finance (Strategy) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 December 2023   
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Housing and Technical Resources – 8 November 2023 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
35

Page 36

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 3.2 5.5 5.7 April 3.6 10.6 6.9 April 3.3 7.6 6.2 April 4.3 5.6 5.1
May 2.9 4.5 4.9 May 4.2 8.1 6.1 May 3.4 6.0 5.4 May 4.9 5.4 5.1
June 3.5 4.9 5.4 June 6.2 8.5 6.8 June 4.6 6.4 6.0 June 4.7 5.3 4.7
July 4.0 5.5 5.0 July 5.7 8.9 8.1 July 4.7 6.9 6.2 July 4.0 4.6 3.8
August 4.9 4.7 5.1 August 7.9 7.1 8.5 August 6.2 5.7 6.4 August 4.7 4.4 4.1
September 5.8 4.5 4.7 September 8.1 6.3 7.8 September 6.8 5.2 6.0 September 6.4 5.4 5.3
October 5.2 4.3 4.9 October 9.0 7.8 5.2 October 6.8 5.8 5.0 October 6.3 5.8 5.1
November 5.7 4.6 4.8 November 9.2 7.8 6.7 November 7.2 5.9 5.6 November 6.9 6.5 6.2
December 4.6 4.4 December 9.5 7.2 December 6.7 5.6 December 6.9 7.0
January 5.2 4.5 January 8.8 5.5 January 6.7 4.9 January 7.0 5.8
February 6.4 4.4 February 8.5 6.2 February 7.3 5.1 February 6.6 5.9
March 7.8 5.3 March 10.7 6.8 March 9.0 5.9 March 7.9 6.4
Annual Average 4.9 4.8 4.9 Annual Average 7.6 7.6 6.8 Annual Average 6.1 5.9 5.7 Annual Average 5.9 5.7 5.4
Average Apr-Nov 4.4 4.8 5.1 Average Apr-Nov 6.7 8.1 7.0 Average Apr-Nov 5.4 6.2 5.9 Average Apr-Nov 5.3 5.4 4.9
889 561 1450 16242No of Employees at 30 November 2023No of Employees at 30 November 2023 No of Employees at 30 November 2023 No of Employees at 30 November 2023
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
APT&C Manual Workers Council Wide
36

Page 37

HOUSING AND TECHNICAL RESOURCES
Sep - Nov Sep - Nov
2022 2023
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 32 36
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 163 190
Sep - Nov Sep - Nov
2022 2023
Over 7 day absences 0 2
Over 3 day absences** 1 0
Minor 5 6
Near Miss 2 0
Violent Incident:  Verbal***** 2 2
Total Accidents/Incidents 10 10
Sep - Nov Sep - Nov
2022 2023
Total Number of Hearings 1 1
Appeals Pending 0 3
Time Taken to Convene Hearing September - November 2023
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 1 0
Sep - Nov Sep - Nov
2022 2023
Number of Grievances 0 1
Number Resolved at Stage 2 0 1
Sep - Nov Sep - Nov
2022 2023
Number of Incidents 1 1
Number Resolved at Formal Stage 1 0
Still in Process 0 1
Sep - Nov Sep - Nov
2022 2023
Career Advancement 4 3
Poor Relationship with Manager/Colleagues 0 1
Moving Outwith Area 1 0
Personal Reasons 1 0
Number of Exit Interviews conducted 6 4
Total Number of Leavers Eligible for Exit Interview 12 19
Percentage of interviews conducted 50% 21%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
70
APPENDIX 2
55 66
23 18
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
53
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
37

Page 38

FTE H/C FTE H/C
Terminations/Leavers 31.62 37 67.84 84
Being replaced 27.91 33 63.73 79
Filling on a temporary basis 0.00 0 0.00 0
Plan to transfer this budget to another post 0.00 0 0.00 0
End of fixed term contract 1.71 2 2.11 3
Held pending service Review 2.00 2 2.00 2
Plan to remove for savings 0.00 0 0.00 0
Appendix 2a
Reason Sep - Nov 2023 Cumulative total
As at 9 September 2023
Total Number of Employees
F/T P/T F/T P/T
802 25 332 127
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 205.10 623.16 357.38 29.60 10.00 0.00 0.00 0.00 1228.24
As at 10 June 2023
Total Number of Employees
F/T P/T F/T P/T
805 27 329 127
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 204.26 628.88 352.43 30.60 10.00 0.00 0.00 0.00 1229.17
MALE FEMALE TOTAL
TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
Salary Bands
Appendix 3
JOINT STAFFING WATCH RETURN
HOUSING & TECHNICAL RESOURCES
1286
1288
*Full - Time Equivalent No of Employees
MALE FEMALE
38

Page 39

Report
Agenda Item 
Report to: Housing & Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Chief Executive and Executive Director (Housing and
Technical Resources)  
Subject: Housing Revenue and Capital Account Budget
2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 outline the revenue estimate proposals for the Housing Revenue Account (HRA)
for 2024/2025
 request approval for the 2024/2025 Housing Capital Programme totalling
£77.303 million
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the proposed rent increase of 6.50% to be applied in 2024/2025 with a
further 6.50% increase in 2025/2026 and again in 2026/2027 (reviewed
annually), to all Council houses, Gypsy/Traveller sites, lock-ups and garage
sites and the revenue estimate proposals for the HRA, as detailed in Appendix
1, be endorsed
(2) that the findings of the HRA Loans Fund Review be implemented (Section 4),
be endorsed
(3) that based on the rent increase of 6.50%, the 2024/2025 Housing Capital
Programme of £77.303 million, as detailed in Appendix 2, be endorsed; and
(4) that the recommendations be referred to Executive Committee, for
endorsement, then to Council for approval
[1recs]
3. Proposals for Housing Revenue and Capital Account Budget 2024/2025
3.1. The HRA revenue budget for 2024/2025 has been prepared in line with the 30-year
HRA Business Plan.  This has been developed to reflect the investment priority to
maintain and improve the housing stock to meet national housing quality and energy
efficiency standards.  The programme also includes projects to increase the supply
of council housing as well as environmental works and legislative compliance
programmes to ensure that all safety requirement standards are met. 
3.2. The movement from the original 2023/2024 revenue budget is outlined in Appendix
1.  The main expenditure movements are:- 
 Supervision and Management Costs increased for pay award and other
inflationary pressures and efficiency saving targets (as detailed further in
Paragraph 3.7)
8
39

Page 40

 Housing Repairs and Maintenance reflecting a prudent allocation for expected
costs and demands for these services
 Financing Costs Loan Charges reflects the costs associated with the planned
investment requirements and the HRA Loans Fund Review (as detailed further
in Section 4)
 House Rents are inclusive of additional new stock and the proposed rent
increase
 A planned transfer from reserves reflects requirement within the 2024/2025
budget for the long term investments included in the 30-year HRA Business
Plan 
3.3. The 2024/2025 budget proposal also includes a provision of £3.743 million for bad
debt which is required to continue to provide for the potential impact on rent
collection and arrears.  This includes contingency for the ongoing uncertainty on
rental collections in the coming year due to cost-of-living pressures and an allocation
of £0.300 million for tenancy sustainment mitigation. 
3.4. In previous rounds of budget engagement, tenants have favoured multi-year
agreements on the basis that they provided some clarity regarding rent levels over
the medium term.  A rent increase of 6.50% is proposed from 2024/2025 with a
further 6.50% increase in 2025/2026 and again in 2026/2027.  In accordance with
statutory requirements, this 3-year commitment will be subject to annual review and
customer engagement.  This approach will allow the Council and tenants to plan and
budget on a longer-term basis.  To achieve this level of rent increase, a re-profiling of
the long-term investment priorities has been undertaken.  Short-term investment
priorities and current service levels will be maintained. 
3.5. One of the headlines from the recently published Scottish Government draft budget
for 2024/2025 is a reduction in funding available for the Affordable Housing Supply
Programme.  The 2024/2025 budget represents a decrease of 22% on the previous
published figure for 2024/2025.  At this time, it is still unclear how the Scottish
Government will reduce individual Council’s funding.  Further discussions are
planned with the More Homes Team at the Scottish Government for further clarity on
the situation.  Any reduction in Scottish Government grant available for the Council
may impact the planned investment to increase the overall supply of Council
housing.  We will report back to committee when we have information on the impact
for the Council which may affect the 2024/2025 and future years capital
programmes. 
3.6. It should be noted that, based on the latest Scottish Social Housing Charter returns,
the average rent charges for South Lanarkshire Council tenants remain affordable
and are currently the seventh lowest of local authority landlords in Scotland.  In
addition, South Lanarkshire Council tenants’ rent charges are the lowest of all the
social landlords operating in South Lanarkshire.   
3.7. In line with the HRA Business Plan, a reduction of £0.300 million for efficiencies has
been included within the Resources Supervision and Management and Other
Income budgets.  £0.100 million of the efficiencies do not affect the delivery of
services to our tenants and relate to the removal of vacant posts from the current
establishment.  The remaining £0.200 million is anticipated to come from
standardising charges for washing and drying facilities across all Council areas (as
approved at the Housing and Technical Resources Committee on 8 November
2023). 
40

Page 41

4. Housing Revenue Account – Loans Fund Review
4.1. Background: The Council approved the implementation of the findings from the
Loans Fund Review in 2020 (Executive Committee on 24 June 2020).  As part of this
exercise, Link Asset Services completed work to analyse the impact on the HRA
loans fund principal repayments if we were to implement a Loans Fund Review for
the HRA.  This work has been refreshed to bring it up to date as at end March 2023.   
4.2. In summary, the review relates to how HRA debt is written off in our accounts. 
Members will be aware that the HRA capital programme is partly funded by planned
borrowing.  This borrowing is taken from the Council’s Loans Fund (which is a fund
identified to manage the external borrowing for the Council and the subsequent
onward ‘lending’ to fund the HRA capital programme).  The funding for capital spend
is known as Loans Fund Advances.  Repayment of these advances is made each
year and these repayments form part of the HRA revenue expenditure.  Therefore,
borrowing to fund the HRA capital programme creates a liability to repay those
advances from future years’ budgets. 
4.3. Implementing the Loans Fund Review means looking at the repayment term of loans
and the lifespan of the related assets.  The main focus is on the assets that
transferred from the former district councils.  The balance of Loans Fund Advances
outstanding as at 31 March 2004 are recalculated to reflect a 40 year life using a
standard rate of interest of 5%.  The anticipated remaining life previously was 13
years.  This means that we are assuming as at 31 March 2004, our housing stock,
including that inherited from the former district councils, could be expected to last
another 40 years and this has been endorsed by Property Services as realistic.  All
subsequent advances are repaid over a 40 year life using a standard rate of interest
of 5%. 
4.4. Proposed Approach: As at 31 March 2023, outstanding Loans Fund Advances for
the HRA totalled £292.694 million.  However, by applying the Loans Fund Review,
the Loans Fund Advances as at 31 March 2023 should have been £407.126 million,
meaning that the accounting for repaying debt resulted in an overpayment of
£114.432 million.  This is referred to as a recalculation adjustment.  Table 1 below
details how the overpayment is calculated. 
Table 1: Loans Fund Advances Calculations  
Actual Loans Fund Repayments Revised Loans Fund Repayments Difference 
Opening
Advances
£m
Repayments 
£m
Closing
Advances
£m
Opening
Advances
£m
Repayments 
£m
Closing
Advances
£m  £m
2004/2005
(Opening
Balance)
246.822 190.120 56.702 246.822 62.399 184.423 127.721
2004/2005 –
2022/2023
240.260 4.268 235.992 240.260 17.557 222.703 -13.289
Total 487.082 194.388 292.694 487.082 79.956 407.126 114.432 
4.5. It is proposed that the recalculation adjustment is applied over the financial years
2023/2024 to 2025/2026 to reduce the HRA repayments in these years by £22.000
million, compared to current repayment profiles.   
41

Page 42

4.6. Utilising the Benefits of the Loans Fund Review: This will realise an in-year
benefit in 2023/2024 and a reduction in the level of budget required for Loan
Charges in the next 2 years.  This can then support other spend within the HRA to
the value of £22.000 million including the increasing cost of housing repairs and
maintenance and the annual contribution to the capital programme for housing
investment works. 
4.7. The remainder of the recalculation adjustment can be applied over the financial
years 2026/2027 to 2043/2044.  This reduces the principal repayments in these
years but they are still higher than current repayment profiles.  This begins at £0.002
million in 2026/2027 and increases incrementally to £0.969 million in 2043/2044.   
4.8. Over the whole time period, the principal repayments that the HRA make remain the
same.  We are reprofiling these to give the HRA benefit of £22.000 million over the
period 2023/2024 to 2025/2026.  This benefit will then be repaid through increased
charges over the period 2026/2027 to 2066/2067.  Further details are shown in
Appendix 2. 
4.9. Additional Debt Repayments: While the HRA will repay the same level of debt, it
will be over a longer period of time.  Repaying over a longer timeframe means
incurring additional interest payments.  These equate to approximately £1 million per
annum on average.  The total cost of the reprofiling of the Loans Fund Advances is
circa £41 million over the debt repayment period and has been factored into the 30-
year HRA Business Plan. 
5. Housing Revenue Account – Capital Programme Estimates
5.1. The 2024/2025 capital programme is compiled in line with the 30-year HRA Business
Plan.  As well as continuing to plan and undertake the works needed to maintain and
improve the housing stock to meet national housing quality and energy efficiency
standards, a significant workstream in this year’s Housing Investment Programme
will be to continue our investment to increase the overall supply of Council housing in
line with the target to deliver an additional 1,300 council homes by 2027. The full
HRA capital programme for 2024/2025, including expected costs and funding for the
new housing supply target, is detailed in Appendix 3. 
5.2. Further key investment activities in relation to these priorities include heating
replacements and insulation, external fabric upgrading, windows and doors
replacement, legislative compliance works and other external environmental
improvements. 
5.3. The funding for this programme is detailed in Table 2 below:- 
Table 2: Capital Programme Funding 
£m
Revenue Contribution to 2024/2025 Capital Programme 33.506
Borrowing 20.259
Scottish Government Grant – Additional Council Houses 23.418
Scottish Government Grant – Mortgage to Rent 0.120
Total Capital Programme Funding 77.303 
42

Page 43

5.4. As per Section 3.5., the Scottish Government grant anticipated in Table 1 above will
be impacted by the funding available to the Council for Affordable Housing Supply
Programme.  The grant and borrowing assumptions above are based on the
anticipated 143 units and 120 acquisitions expected to be completed during
2024/2025.  Delivery of the Council target of 1,300 properties will involve significant
higher levels of completion in the following 2 years (2025/2026 and 2026/2027). 
5.5. Borrowing for the £20.259 million noted in Table 1 includes previously approved
borrowing of £3.085 million carried forward from previous years.  An additional
£17.174 million of new borrowing for additional housing supply is included within the
borrowing total which will result in an increase to the annual Loan Charges of circa
£0.770 million per annum starting in 2025/2026.  These costs are included within the
HRA Business Plan, with the overall rental income from the additional stock numbers
and the annual rent increase meeting the additional costs. 
6. Consultation Arrangements
6.1. The Budget Scrutiny Group (BSG) provides the main vehicle for discussion between
the Council and tenant representatives on the housing budgetary process and the
financial challenges and opportunities facing Housing Services.  Each year, the
Council and the BSG work together to develop and co-ordinate the consultation
programme on setting Council rent levels for the year ahead.   
6.2. This year’s consultation programme followed a similar approach to previous years
with the main focus on an on-line survey, open to all Council tenants which was
widely promoted via the South Lanarkshire View and through the Council’s social
media channels.  In addition, other engagement opportunities and events were held
including local area focus group meetings, specific focus group meetings with
Gypsy/Traveller residents and homelessness service users and direct contact with
tenants via email and text, seeking views and encouraging completion of the survey. 
6.3. During the consultation, the BSG and Tenant Participation Co-ordination Group
(TPCG) participated in open discussions with senior Council officers on key issues
and challenges facing the Council, including the ongoing economic uncertainty and
impact of the cost-of-living-crisis, increased costs associated with delivering frontline
services and the Council’s commitment to ensuring rents remain affordable. 
6.4. A summary of the feedback received from the TPCG/BSG is provided below:- 
 the various challenges facing the Council were recognised and it was
understood that the Council cannot continue to absorb the high cost of
delivering services
 the need to increase rent levels in line with inflation to reduce borrowing and
increase reserves was understood
 the group was supportive of the Council’s commitment to rents remaining
affordable
 support was expressed for the proposal to set rents for a 3-year period with an
annual review 
 it was recognised that the continuing economic uncertainty presents additional
risks to the Council in relation to the investment and new build programmes 
6.5. Feedback received from the various engagement events and the on-line survey is
set out below:- 
 there was strong agreement from respondents that the proposed investment
priorities are the right ones
43

Page 44

 the BSG and focus group attendees were broadly supportive of the 6.50% rent
increase and the proposal to set sent levels for 3 years
 over 1,200 surveys were completed during the consultation
 37% of respondents supported the rent level to be increased by 6.50%
 a significant majority (77%) of respondents supported setting rent levels for the
next 3 years with an annual review 
7. Employee Implications
7.1. There are no employee implications as a result of this report. 
8. Financial Implications
8.1. The financial implications are as detailed in the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The impact which capital investment will have upon climate change and
sustainability is appropriately considered through the Resource’s approach to project
design, procurement, project management and delivery.  Works will be progressed in
such a way to support a positive impact on the environment.  Appropriate mitigation
actions will be put in place where any potential negative impact is identified. 
10. Other Implications
10.1. The risks associated with this report are in relation to the Council’s ability to collect
rents and charges following the increases.  These risks have been assessed and
added to the Resource Risk Register. 
10.2. Social landlords, such as the Council, are required to submit an Annual Assurance
Statement to the Scottish Housing Regulator.  This provides assurance that the
organisation is compliant with the relevant requirements of Chapter 3 of the
Regulatory Framework, all relevant standards and outcomes in the Scottish Social
Housing Charter and all relevant legislative duties.  The content of this report will
contribute to the evidence to support this Statement. 
11. Equality Impact Assessment and Consultation Arrangements 
11.1. Equality Impact Assessments are not required for the management and operational
efficiencies included in the proposed budget.  In addition, an assessment has been
carried out in line with the Fairer Scotland Duty.  For details, please contact the
Strategy and Support Manager, Housing and Technical Resources. 
11.2. Details of the consultation arrangements are set out in section 6 above. 
Paul Manning
Chief Executive 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
12 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Accountable, effective, efficient and transparent 
44

Page 45

Previous References
 Executive Committee, 24 June 2020, 2021/2022 Revenue Budget Strategy and
Savings Requirement
 Housing and Technical Resources Committee, 23 January 2023, Housing Revenue
and Capital Account Budget 2023/2024
 Housing and Technical Resources Committee, 8 November 2023, Laundry Facilities –
Introduction of Charging 2024/2025 
List of Background Papers
 Revenue Budget Working Papers 2024/2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637 (Tel: 01698 455637)
Email:  jackie.taylor@southlanarkshire.gov.uk
45

Page 46

Appendix 1
SOUTH LANARKSHIRE COUNCIL
HOUSING REVENUE ACCOUNT
REVENUE ESTIMATES YEAR 2024/2025 
2023/2024     2024/2025   Movement
Estimate Estimate £m
£m   £m  £m          
Expenditure                  
31.093   Supervision and Management 33.677  2.584
41.380   Housing Repairs and Maintenance 47.600  6.220
2.445   Void Rents 2.588  0.143
19.230   Financing Costs Loan Charges 10.729  (8.501)
27.162   Contribution to Capital Programme 33.506  6.344
0.000   Reserves to C/F 0.000  0.000        
121.310    Total Expenditure   128.100   6.790 
Income   
104.668   House Rents 111.801  7.133
2.679   Other Rents 2.802  0.123
0.067   Interest 0.067  0.000
8.989   Other Income 9.201  0.212
4.907   Use of B/F Reserves 4.229  (0.678)        
121.310   Total Income 128.100  6.790             
46

Page 47

Appendix 2
(1) (2) (3) (4) (5) (6) (7) [(1) + (4)] (8) [(2) + (5)] (9) [(3) + (6)] (10) (11) (12) (13) (14)
Reprofiled
Loans Fund
Advances
Existing
Repayments Difference
Future
Reprofiled
Loans Fund
Advances
Future
Repayments Difference
Reprofiled
Loans Fund
Advances Repayments Difference
Reprofiled
Loans Fund
Advances
Apply
Recalculation
Adjustment
Actual
Repayments
Benefit
(Difference to
Existing
Repayments)
Cumulative
Benefit
2023/2024 8.030 8.348 -0.318 0.000 0.000 0.000 8.030 8.348 -0.318 8.030 -8.030 0.000 8.348 8.348
2024/2025 8.431 8.508 -0.077 0.193 0.287 -0.094 8.624 8.795 -0.171 8.624 -8.624 0.000 8.795 17.143
2025/2026 8.853 8.798 0.055 0.458 0.660 -0.202 9.311 9.458 -0.147 9.311 -4.710 4.601 4.857 22.000
2026/2027 9.295 8.970 0.325 0.704 0.997 -0.293 9.999 9.967 0.032 9.999 -0.030 9.969 -0.002 21.998
2027/2028 9.760 9.308 0.452 0.961 1.330 -0.369 10.721 10.638 0.083 10.721 -0.078 10.643 -0.005 21.993
2028/2029 10.248 9.626 0.622 1.010 1.377 -0.367 11.258 11.003 0.255 11.258 -0.236 11.022 -0.019 21.974
2029/2030 10.761 9.973 0.788 1.060 1.426 -0.366 11.821 11.399 0.422 11.821 -0.391 11.430 -0.031 21.943
2030/2031 11.299 9.524 1.775 1.113 1.476 -0.363 12.412 11.000 1.412 12.412 -1.310 11.102 -0.102 21.841
2031/2032 11.864 9.153 2.711 1.169 1.529 -0.360 13.033 10.682 2.351 13.033 -2.181 10.852 -0.170 21.671
2032/2033 12.457 9.511 2.946 1.227 1.583 -0.356 13.684 11.094 2.590 13.684 -2.404 11.280 -0.186 21.485
2033/2034 13.080 9.787 3.293 1.288 1.639 -0.351 14.368 11.426 2.942 14.368 -2.731 11.637 -0.211 21.274
2034/2035 13.734 10.173 3.561 1.353 1.697 -0.344 15.087 11.870 3.217 15.087 -2.986 12.101 -0.231 21.043
2035/2036 14.420 10.574 3.846 1.421 1.757 -0.336 15.841 12.331 3.510 15.841 -3.258 12.583 -0.252 20.791
2036/2037 15.141 10.991 4.150 1.492 1.819 -0.327 16.633 12.810 3.823 16.633 -3.548 13.085 -0.275 20.516
2037/2038 15.898 6.102 9.796 1.566 1.883 -0.317 17.464 7.985 9.479 17.464 -8.798 8.666 -0.681 19.835
2038/2039 16.693 6.338 10.355 1.644 1.950 -0.306 18.337 8.288 10.049 18.337 -9.327 9.010 -0.722 19.113
2039/2040 17.528 6.581 10.947 1.727 2.019 -0.292 19.255 8.600 10.655 19.255 -9.888 9.367 -0.767 18.346
2040/2041 18.404 6.843 11.561 1.813 2.090 -0.277 20.217 8.933 11.284 20.217 -10.473 9.744 -0.811 17.535
2041/2042 19.325 7.102 12.223 1.904 2.165 -0.261 21.229 9.267 11.962 21.229 -11.101 10.128 -0.861 16.674
2042/2043 20.291 7.320 12.971 1.999 2.241 -0.242 22.290 9.561 12.729 22.290 -11.813 10.477 -0.916 15.758
2043/2044 21.305 7.601 13.704 2.099 2.321 -0.222 23.404 9.922 13.482 23.404 -12.515 10.889 -0.967 14.791
2044/2045 - 2066/2067 120.309 111.563 8.746 81.764 75.719 6.045 202.073 187.282 14.791 202.073 0.000 202.073 -14.791 0.000
Totals 407.126 292.694 114.432 107.965 107.965 0.000 515.091 400.659 114.432 515.091 -114.432 400.659 0.000
Columns 1-3 show the reprofiled loans fund advances outstanding as at 31 March 2023 along with existing repayments and the recalculation adjustment as shown in Table 1.
Columns 4-6 show the repayment of estimated future borrowing while columns 7-9 show total borrowing.
Columns 10-12 show the reprofiled advances and the application of the recalculation adjustment over the years 2023/2024 to 2043/2024 to leave the actual repayments that will be made from the HRA.
Column 12 is the same as Column 8 showing that the HRA will repay the same level of debt that is actually outstanding.
Column 13 shows the annual benefit while the cumulative benefit is shown in Column 14 with this reaching £22.000m by 2025/2026.
Existing Borrowing as at 31 March 2023 Future Borrowing Total Borrowing Principal Repayments
47

Page 48

Appendix 3
SOUTH LANARKSHIRE COUNCIL
HOUSING REVENUE ACCOUNT
CAPITAL ESTIMATES YEAR 2024/2025 
Area  Project Title Budget 
Provision of Council Housing     
SLC Wide Provision of Council
Housing  £43,397,000
SLC Wide Mortgage To Rent  £400,000
Provision of Council Housing Sub Total    £43,797,000    
Refurbishment works     
Kitchen & Bathrooms     
SLC Wide Kitchens & Bathrooms  £10,000,000 
Kitchen & Bathrooms Sub Total    £10,000,000 
Heating Replacements     
SLC Wide Central Heating
Upgrades/Installations  £5,000,000 
Heating Replacements Sub Total     £5,000,000 
External Fabric Upgrading Works     
SLC Wide External Fabric Upgrading
- Various Blocks  £6,000,000 
External Fabric Upgrading Works Sub Total   £6,000,000 
Environmental Works     
SLC Wide Environmental
Improvements £1,200,000 
Environmental Works Sub Total   £1,200,000 
Energy Efficiency Works      
SLC Wide External Wall Insulation  £1,250,000 
Energy Efficiency Works Sub Total    £1,250,000 
Miscellaneous Projects     
SLC Wide Legislative Compliance
Works £2,700,000 
SLC Wide Window and Door
Replacement Programme  £5,520,000 
SLC Wide
Sheltered Housing
Schemes Refurbishment
Works 
£876,000 
SLC Wide Services Upgrades  £660,000 
SLC Wide Area Regeneration £100,000 
SLC Wide Council House
Adaptations £150,000 
SLC Wide Alterations including DDA £50,000 
Miscellaneous Projects Sub Total    £10,056,000 
Refurbishment Works Sub Total    £33,506,000       
Total Capital Programme 2024/2025    £77,303,000 
48

Page 49

Report 
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Housing Allocation Policy – Local Letting Plans
2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise on progress against the 2023/2024 letting targets
 request approval for the 2024/2025 letting targets
 request approval for the 2024/2025 local letting initiatives
?1ur[1purpos
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that progress against the 2023/2024 letting targets, be noted 
(2) that the 2024/2025 mainstream housing letting targets, attached as Appendix
1, be approved
(3) that the 2024/2025 sheltered housing letting targets, attached as Appendix 2,
be approved; and
(4) that the Local Letting Initiatives attached as Appendix 3, be approved
[[1recs]
3. Background
3.1. Local Letting Plans (LLPs) have been a key feature of the Housing Allocation Policy
since 2009.  During the review of the Housing Allocation Policy in 2018/2019, it was
recognised that LLPs continue to provide an effective means for ensuring that a
strategic and flexible approach is taken in the allocation of council housing in South
Lanarkshire.  Consequently, LLPs were retained within the revised Housing Allocation
Policy, which came into effect in May 2019. 
3.2.  On an annual basis, LLPs are prepared for each of the housing management areas of
South Lanarkshire.  LLPs provide an overview of local supply and demand and set
out:- 
 annual letting targets for each of the 4 housing lists (in relation to mainstream
and sheltered properties); and
 details of Local Letting Initiatives (LLIs) in operation within a local area 
3.3. The targets and initiatives detailed within LLPs are subject to Housing and Technical
Resources Committee approval.  This is the fourth annual report on LLPs since the
revised Housing Allocation Policy was introduced. 
9
49

Page 50

4. Rapid Rehousing Transition Plan
4.1.  The South Lanarkshire Rapid Rehousing Transition Plan (RRTP) 2019 to 2024 sets
out a number of objectives to address homelessness and limit the amount of time
people experiencing homelessness spend in temporary accommodation.  Identifying
and reviewing letting targets contributes towards achieving the priority objectives set
out within the RRTP. 
5. Achievement of the 2023/2024 Letting Targets
5.1. The information provided in relation to the achievement of letting targets has been
projected to the end of the financial year, based on data collated between 3 April and
10 December 2023.  This approach allows letting targets and letting initiatives to be
fully implemented from the start of the financial year. 
5.2. Across each housing management area, letting targets are set within bands for each
housing list to allow for a degree of flexibility when allocating properties.  Full details
of the projected outcomes in relation to the targets set for both mainstream and
sheltered properties in 2023/2024 are set out in Appendices 1 and 2. 
5.3. In relation to mainstream council properties, it is projected that across South
Lanarkshire, performance in relation to the Urgent Housing Need List will be above the
banded target.  This can be attributed to the significant increase in homelessness
experienced both locally and nationally.  Consequently, lets directed to the Transfer
and Waiting lists are projected to be below the target while lets to the Other Categories
list within the target.  A key focus for local housing teams is to increase lets to transfer
applicants to help achieve the year-end target which will in turn increase turnover. 
5.4. In relation to the targets set for sheltered properties across South Lanarkshire, it is
projected that lets to all housing lists will be within target.   
6. Letting Targets for Mainstream Properties during 2024/2025
6.1. The letting targets proposed for mainstream properties across South Lanarkshire and
for each of the 4 housing management divisions are set out in Appendix 1. 
6.2.  The factors which have been taken into account when setting the mainstream letting 
targets for 2024/2025 are detailed below:- 
♦ demand for social rented housing remains high – 13,431 applicants were on the
HomeFinder housing register as at 10 December 2023 
♦ a continuing high demand from homeless households – between 3 April and 10
December 2023, 1,952 homelessness applications have been received. 
Assuming this trend continues, it is projected that 2,820 homelessness
applications will have been received by the end of the financial year.  This
represents an increase of 13% on the 2022/2023 year end position and reflects
a general increase in homelessness presentations being experienced nationally 
♦ the Council’s statutory duty to homeless households – the number of applicants
assessed as homeless and to whom the Council has a duty to provide settled
accommodation remains high.  As at 10 December 2023, there were 1,581
homeless applicants on the HomeFinder housing register, an increase of 20%
(1,312) on the 2022/2023 year end position 
50

Page 51

♦ the number of properties becoming available for let – it is projected that by the
end of the financial year, 1,825 mainstream properties will have been let.  Whilst
this represents a increase of 7% on the previous year, this figure is comparable
with average turnover levels pre-Covid 
♦ additional supply of housing – the number of Council new build properties and
acquisitions planned for completion during 2024/2025 
♦ joint working with partners – the contribution that HomeFinder partners and other
Registered Social Landlords (RSLs) make to meeting housing need, including
the needs of homeless applicants and other priority groups, through agreed
targets 
7. Sheltered Housing Letting Targets for 2024/2025
7.1.  Between 3 April and 10 December 2023, 112 sheltered properties became available
for let.  It is projected that by the end of the financial year, 162 sheltered properties will
have been let, broadly comparable to the number let in 2022/2023. 
7.2. There continues to be a high level of demand for sheltered housing with 1,159
applicants on the HomeFinder housing register as at 10 December 2023.   
7.3. It is recognised that demand for sheltered housing varies across areas and individual
sheltered housing developments and this has been taken into account in the letting
targets proposed for 2024/2025. 
7.4. The letting targets proposed for sheltered properties across South Lanarkshire and for
each of the 4 housing management areas are set out in Appendix 2. 
8.  Letting Initiatives
8.1.  The Housing Allocation Policy allows for the establishment of LLIs in areas where there
are particular needs, issues or circumstances which require to be addressed. 
8.2.  During 2023/2024, there were 6 LLIs in operation across South Lanarkshire.  To inform
the development of the LLPs for 2024/2025, each of the letting initiatives have been
subject to review to assess their impact and identify whether there is a need for the
initiative to continue. 
8.3. It is proposed that the existing 6 LLIs, set out in Appendix 3, be retained during
2024/2025.   
8.4. In the previous Local Letting Plan report presented to Committee in March 2023, it was
recoginised that there are benefits to supporting tenants living in larger homes to
downsize to a smaller property.  Consequently, it was agreed that during 2023/2024,
a proactive approach would be taken to support council tenants under occupying larger
sized properties, to downsize to a smaller property, where they wished to do so.   
8.5. During 2023, a review of council tenants living in 4-bedroom properties was carried
out.  The key aim being to consider the tenant’s needs and application preferences,
provide housing options advice and where appropriate, ensure their application was
placed appropriately on the housing register to maximise their chance of being re-
housed to a smaller property.   
51

Page 52

8.6.  At the same time, a change in operational practice was also introduced to ensure that
when a council tenant (living in either a 3 or 4-bedroom property) submits a new
application for housing, specific consideration is given to application preferences and
housing options advice provided to enhance the tenant’s chance of being re-housed.   
8.7. As a result of the review exercise and through the mainstream allocation process,19
tenants have been rehoused in a smaller, more suitable property and 3 tenants have
been made an offer of housing.  In addition, through the right to mutual exhange, a
further 20 tenants have also been rehoused from a larger property to a smaller home.   
8.8. It is proposed that this approach will continue in the year ahead and expanded to
include a focus on tenants living in 3-bedroom properties. 
9. Next Steps
9.1.  Implement 2024/2025 letting targets effective from Monday 1 April 2024. 
9.2.  Publish the 2024/2025 Local Letting Plans on the South Lanarkshire Council website. 
9.3.  Continue to monitor the impact of the Local Letting Initiatives throughout the year. 
10. Employee Implications
10.1.  There are no employee implications contained within this report. 
11. Financial Implications
11.1. There are no financial implications contained within this report. 
12. Climate Change, Sustainability and Environmental Implications
12.1. This report does not introduce a new policy, function or strategy which impacts on the
natural environment, climate change or sustainability. 
13. Other Implications
13.1.   The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
13.2. The risks associated with welfare reform have been included within the Resource’s
risk register and actions taken to mitigate these risks where possible. 
14. Equality Impact Assessment and Consultation Arrangements
14.1.  An equality impact assessment has been carried out on each LLI proposed for
2024/2025.  The assessment is that the proposals do not have any adverse impact on
any of the protected characteristics groups.   
14.2. Consultation on the proposed letting targets and the LLIs has taken place with 
tenants and other customers at a meeting of the Tenant Participation Co-ordination
Group.   
Stephen Gibson
Executive Director (Housing and Technical Resources) 
11 January 2024 
52

Page 53

Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 We will work to put people first and reduce inequality
 Focused on people and their needs
 Caring, connected, sustainble communities 
 Accountable, effective, efficient and transparent 
Previous Reference
 Housing and Technical Resources Committee – Local Letting Plans, 15 March 2023 
List of Background Papers
 Local Letting Plans 2023/2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Sharon Egan, Head of Housing Services
Ext: 4595 (Tel: 01698 454595)
E-mail: sharon.egan@southlanarkshire.gov.uk
53

Page 54

Appendix 1 
SLC Proposed Letting Targets for Mainstream Properties 2024/2025   
South Lanarkshire
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 55-65% 1382 75% 55-65%
Transfer 15-25% 202 11% 15-25%
Waiting 15-20% 166 9% 15-20%
Other Categories 0-5% 88 5% 0-5%  
1838 100% 
Cambuslang/Rutherglen Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 55-65% 290 80% 55-65%
Transfer 15-25% 14 4% 15-25% 
Waiting 15-20% 18 5% 15-20%
Other Categories 0-5% 39 11% 0-5%  
361 100% 
Clydesdale Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 45-55% 222 60% 45-55%
Transfer 20-25% 48 13% 20-25%
Waiting 20-30% 85 23% 20-30%
Other Categories 0-5% 16 4% 0-5%  
371 100% 
East Kilbride Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 60-65% 334 85% 60-65%
Transfer 20-30% 29 8% 20-30%
Waiting 5-15% 17 4% 5-15%
Other Categories 0-5% 13 3% 0-5%  
393 100% 
Hamilton Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 60-65% 536 75% 60-65%
Transfer 15-25% 111 16% 15-25%
Waiting 10-20% 46 6% 10-20%
Other Categories 0-5% 20 3% 0-5%  
713 100% 
54

Page 55

Appendix 2 
SLC Proposed Letting Targets for Sheltered Properties 2024/2025   
South Lanarkshire
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 15-30% 35 22% 15-30%
Transfer 40-50% 71 44% 40-50%
Waiting 25-35% 54 33% 25-35%
Other Categories 0-5% 1 1% 0-5%  
161 100% 
Cambuslang Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 15-20% 9 69% 15-20%
Transfer 35-45% 3 22% 35-45%
Waiting 35-45% 1 9% 35-45%
Other Categories 0-5% 0 0% 0-5%  
13 100% 
Clydesdale Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 15-20% 7 26% 15-20%
Transfer 35-45% 6 22% 35-45%
Waiting 35-45% 13 48% 35-45%
Other Categories 0-5% 1 4% 0-5%  
27 100% 
East Kilbride Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 20-30% 10 17% 20-30%
Transfer 30-45% 27 45% 30-45%
Waiting 30-40% 23 38% 30-40%
Other Categories 0-5% 0 0% 0-5%  
60 100% 
Hamilton Division
Housing Need List 2023/2024 2023/2024 Projected
Lets
2024/2025
Target Number % Target
Urgent Housing Need 25-35% 9 15% 15-25%
Transfer 45-50% 35 57% 50-55%
Waiting 15-25% 17 28% 20-30%
Other Categories 0-5% 0 0% 0-5%  
61 100% 
55

Page 56

Appendix 3 
Proposed Local Letting Initiatives for 2024/2025 
Management
Area
Details of LLI Area covered by
LLI
Property
types/sizes
Duration
of LLI
Clydesdale  Priority for housing will be
given to applicants who have
a social or economic
connection with the area.  To
encourage tenancy
sustainment, discussions will
take place with prospective
tenants to ensure that they
fully understand the context to
living in a rural location. 
Forth East
Douglas
Douglas Water
Glespin
Rigside
All property
types/sizes
1 year     
Hamilton Reasonable priority for
housing to be given to
applicants with an assessed
mobility need. 
Almada Tower
Wyler Tower
1 and 2
bedroom multi
storey flats
1 year 
Cambuslang Reasonable priority for
housing to be given to
applicants with an assessed
mobility need.
Rosebank Tower
Sherry Heights
Standford Hall
Logan Tower
Springhall Court 
2 bedroom
multi storey
flats
1 year 
Cambuslang Priority for housing to be
given to Transfer list and
Waiting list applicants who
have a local connection. 
Cathkin Braes
Tenant
Management
Co-operative
area 
All property
sizes and
types
1 year 
Cambuslang  Priority for housing to be
given to Transfer list and
Waiting list applicants who
have a local connection. 
Whitlawburn  All property
types and
sizes
1 year
Rutherglen Restrict lets to the Urgent
Housing Need list up to 45%. 
Greenhill Court All 1 and 2
bedroom
properties
1 year
56

Page 57

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: South Lanarkshire Council Customer Involvement
Strategy 2024 to 2029 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval from Housing and Technical Resources Committee for the
introduction of the revised Customer Involvement Strategy with effect from 1 April
2024.   
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the revised South Lanarkshire Council Customer Involvement Strategy,
attached as Appendix 1, be approved; and
(2) that the revised strategy be implemented with effect from 1 April 2024
recs]
3. Background
3.1. This is the fifth strategy prepared in accordance with the requirements of the Housing
(Scotland) Act 2001 and was developed in accordance with relevant legislation and
regulatory requirements.  The current strategy relating to the approach the Council
takes in relation to customer involvement was approved by the  Housing and Technical
Resources Committee on 23 May 2018. 
3.2. On 14 December 2022, Housing and Technical Resources Committee approved the
updated Policy and Strategy Review Schedule which confirmed that a review of the
Council’s Customer Involvement Strategy would take place during 2023.   
3.3. The key aim of this strategy is to ensure extensive engagement with tenants and other
customers to inform the important decisions taken across housing and related 
services.  The strategy has also been developed to reflect the principles of both the
Community Empowerment (Scotland) Act 2015 and the National Standards for
Community Engagement. 
4. Pre-Consultation Stage 
4.1. During the pre-consultation stage, to support the development of a consultative draft,
the following actions were taken:- 
• an evaluation of the current strategy against a range of criteria derived from the
priorities and objectives specified within the strategy and legal and regulatory
requirements 
10
57

Page 58

• a review of other Scottish Local Authority Customer Involvement Strategies
• discussions with the Tenant Participation Co-ordination Group (TPCG), customers
and other services in relation to content of the draft strategy; and
• a review of the feedback received from those with experience of customer
involvement who have used Council services 
4.2. The comments received and views expressed during the pre-consultation stage
informed the consultative draft strategy. 
5. Summary of Key Changes from Current Strategy
5.1. It is proposed that the revised strategy will continue to take forward the learning from
the pandemic and focus on the Council’s approach to customer involvement, with the
following key changes:- 
 undertaking a review of local engagement arrangements with the aim of offering
a variety of opportunities that fit with the needs and aspirations of tenants and
other customers
 enhancing our approach to working alongside communities of interest across
South Lanarkshire to ensure they have the opportunity to influence important
decisions
 considering how we continue to develop new ways of working and new
engagement structures to meet the changing needs and expectations of
customers
 further developing participatory budgeting to ensure that customers can help to
shape the use of key aspects of budget
 developing the “Customer Portal” as part of the new Integrated Housing and
Property Management System which will enhance the ability and scope for direct
engagement with customers; and
 consolidating links with Community Planning to reach more local groups across
South Lanarkshire 
6. Key Features of the Revised Strategy
6.1. To ensure extensive engagement with customers to inform the important decisions
taken across housing services, the revised strategy sets out the approach the Council
will take in customer involvement.   
6.2. This approach is also in line with the Council’s values outlined in Connect 2022-2027:- 
 focused on people and their needs
 working with and respecting others
 accountable, effective, efficient and transparent
 ambitious, self-aware and improving; and
 fair, open and sustainable
 excellent employer 
6.3. The strategy aims to reverse the trend of a decrease in local groups and registered
tenant organisations that began pre-Covid-19, by prioritising the continued
development of customer involvement whilst also focusing on getting more customers
involved and ensuring there are a range of options and opportunities for this to happen. 
6.4. The strategy is focused on 4 strategic outcomes which are set out below, with the
overall goal of further developing the approach and enabling customers to have
realistic opportunities to become involved and help shape housing services.  To
58

Page 59

achieve each of the strategic outcomes, the strategy details a number of associated
priority actions which will be progressed over the next 5 years:- 
 customers are informed and knowledgeable
 more customers are involved
 customers drive continuous service improvement; and
 customers shape change and make a difference 
6.5. The key learning from customer engagement during the pandemic has been reflected
within the new strategy and the Council will continue to offer a range of online, in-
person and hybrid options to give flexibility and further develop levels of involvement. 
6.6. The full revised strategy is contained within Appendix 1. 
7. Formal Consultation Process
7.1. A consultative draft Customer Involvement Strategy was developed in conjunction with
the TPCG and issued for formal consultation from 1 September to 8 December 2023. 
The consultative draft strategy was published on the Council’s website, together with
an online survey, which was developed to guide responses in relation to the following
key aspects of the strategy:- 
 the aims and objectives of the strategy
 the Council’s approach to customer involvement; and
 that priorities and actions to ensure progress of the strategy are appropriate 
7.2. In addition to the launch of the online questionnaire, a range of consultation events
and presentations or discussions with existing interested groups, were taken forward
by officers including:- 
 South Lanarkshire Tenant Participation Co-ordination Group
 South Lanarkshire Disability Partnership Housing Sub-Group
 East Kilbride Sheltered Housing Forum
 Community Planning Progress Group
 Autism Strategy Group
 Corporate Equality and Diversity Coordinating Group; and
 Clydesdale Local Housing Forum 
7.3. Views were also sought from a number of specialist organisations who offer support
and advice to care experienced young people, veterans and members of the armed
forces community, carers and young people. 
7.4. Through the consultation approximately 200 people shared their views on the draft
strategy with key responses including:- 
 high levels of support with the priorities and actions detailed in the strategy
 the importance of ensuring a range of flexible, local options for people to get
involved that recognises people’s different experiences and interests
 the benefit of ongoing promotion of the definition of ‘customer’ to make it easier
for people to understand their ability to participate
 building ongoing relationships with other local groups to make it easier for them
to share their views 
7.5. Views and comments received throughout the consultation were considered and
incorporated as appropriate to inform the preparation of the finalised strategy.
59

Page 60

8. Next Steps
8.1. Following approval from Housing and Technical Resources Committee, the revised
strategy will be implemented from 1 April 2024. 
8.2. Implementation of the strategy will be progressed in conjunction with the TPCG with
an annual report on progress provided to the Housing and Technical Resources
Committee. 
9. Employee Implications
9.1. There are no employee implications associated with this report. 
10. Financial Implications
10.1. There are no financial implications associated with this report. 
11. Climate Change, Sustainability and Environmental Implications
11.1. This report does not introduce a new policy, function or strategy which impacts on the
natural environment, climate change or sustainability. 
11.2. A Strategic Environmental Assessment (SEA) pre-screening determination was
completed as part of the review of the South Lanarkshire Council Customer
Involvement Strategy.  The assessment confirmed that there is no requirement to
complete a SEA.   
12. Other Implications
12.1. There are no other implications as a result of this report. 
12.2. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
13. Equality Impact Assessment and Consultation Arrangements
13.1. Consultation on the draft Customer Involvement Strategy took place between 1
September and 24 November 2023.  During this time a range of key stakeholders,
including tenants and other customers, partner agencies and external organisations
were given the opportunity to comment on the proposed strategy. The views and
comments received have significantly contributed to the shape the finalised strategy
document. 
13.2. An equality impact assessment has been carried out on the recommendations
contained within this report and where identified, remedial action has been taken.  The
assessment is that the proposals do not have any adverse impact on any part of the
community covered by equalities legislation or on community relations.  The results of
the assessment will be published on the Council’s website. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 December 2023 
Link(s) to Council Values/Priorities/Objectives
 focused on people and their needs
 working with and respecting others
 accountable, effective, efficient and transparent
60

Page 61

Previous References
 Customer Involvement Strategy - Housing and Technical Resources Committee, 23 May
2018
 Housing and Technical Resources Policy and Strategy Review Schedule 2022/2023 -
Housing and Technical Resources Committee, 14 December 2022 
List of Background Papers
 South Lanarkshire Customer Involvement Strategy 2018-2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Sharon Egan, Head of Housing Services
E-mail: sharon.egan@southlanarkshire.gov.uk
61

Page 62

62

Page 63

South Lanarkshire Customer Involvement
Strategy 2024-29 
10
63

Page 64

Contents 
1.  Introduction          3 
2.  Legislative and regulatory framework      4 
3.  Our approach to customer involvement      7     
4. Progress and achievements       7 
5. Our strategic outcomes and priorities      11 
6. Resourcing and supporting customer involvement    14 
7. Monitoring, evaluation and review       14 
Appendices 
Appendix 1: Ways to get involved       16 
Appendix 2: Action Plan 2024-2029       17       
Appendix 3:  Our approach to customer involvement     22 
Glossary           24 
64

Page 65

1. Introduction 
1.1 The Customer Involvement Strategy is organised into three main parts:
• Introduction - Providing an overview of the main context and factors shaping the
Customer Involvement Strategy, including legislative requirements and lessons
from previous strategies.
• Customer Involvement – Detailing our approach to customer involvement in
South Lanarkshire and our Strategic Outcomes.
• Delivery – Setting out the action plan and how key partners will work together to
progress the Customer Involvement Strategy 2024-29. 
1.2 This is the fifth strategy prepared in accordance with the requirements of the
Housing (Scotland) Act 2001.This strategy aims to build upon the achievements of
our previous Customer Involvement Strategy and sets out our continued
commitment to engaging and involving customers in shaping housing services. 
1.3 The key aim of this strategy is to ensure extensive engagement with tenants and
other customers to inform the important decisions taken across housing services.
This reflects the principles of both the Community Empowerment (Scotland) Act
2015 and the National Standards for Community Engagement. 
1.4 For the purposes of this strategy, the term ‘customer’ refers to tenants, future
tenants including those on the housing register, Gypsy /Traveller residents, people
experiencing homelessness, and others who use housing services. The strategy will
also consider the protected characteristics of customers, as well as wide ranging
communities of interest such as veterans and members of the armed forces
community, carers, and care experienced young people. 
1.5 We recognise that the best way to ensure that customers are involved in shaping
our housing services is to work in partnership and build on existing relationships.
This approach is also in line with the council values outlined in Connect 2022-2027: 
• focused on people and their needs
•  working with and respecting others
•  accountable, effective, efficient and transparent
•  ambitious, self-aware and improving
•  fair, open and sustainable 
1.6 This strategy sets out: 
• the strengths of our approach and achievements over the period of the previous
strategy
• proposals to further develop customer involvement 
• how we will measure success and monitor progress 
1.7   South Lanarkshire Council has a long history of meaningful customer involvement,
and tenants and other customers have been involved in co-producing this strategy.
As with preceding versions, this strategy has been co-produced with the Tenant
Participation Co-ordination Group (TPCG) supported by the South Lanarkshire
Tenant Development Support Project (SLTDSP).
65

Page 66

2. Legislative and regulatory framework 
2.1  The Strategy is prepared in line with the legal framework for tenant participation set
out in the Housing (Scotland) Acts 2001 and 2010. 
2.2 The Housing (Scotland) Act 2001 introduced a legal requirement for tenant
participation and gave tenants the rights to: 
• form independent registered tenant organisations
• access information about housing policies 
• be consulted on issues that affect them 
• participate in decisions that affect the housing services they receive
• have sufficient time to consider proposals. 
2.3  The Housing (Scotland) Act 2010 introduced the Scottish Social Housing Charter,
with the aim of improving the quality and value of services provided by social
landlords and improving transparency for tenants and customers. 
2.4  We submit an annual return on the Charter to the Scottish Housing Regulator
(SHR) and report on our landlord performance in meeting Charter outcomes to
tenants. Members of the TPCG review the return prior to submission to the SHR.
The return includes key performance information in relation to overall tenant
satisfaction, satisfaction with the opportunities to participate, and the percentage of
tenants who feel they are kept informed. Tenant representatives are involved in
developing the report to tenants which is included within the autumn edition of
‘Housing news’ and published on our website. 
2.5 Our approach to customer involvement also takes account of the principles of the
Community Empowerment (Scotland) Act 2015, which has a specific focus on
promoting effective engagement and participation to help communities achieve
greater control and influence the decisions and circumstances that affect their lives,
including through Community Asset Transfer. To support organisations in putting
the Act into practice, the Local Housing Strategy 2022-27 is committed to ensuring
tenant involvement with Community Asset Transfer applications involving land
currently owned by the Housing Revenue Account. The National Standards for
Community Engagement are also used to shape the participation processes of
public bodies as well as shape how community organisations can involve wider
community interests. 
2.6  To ensure customers are involved in important decisions, this strategy also reflects: 
• Housing to 2040, the long-term strategy for housing in Scotland. This
strategy sets out a vision and a route-map to deliver 110,000 affordable
homes by 2031/32, with at least 70% for social rent, improve tenants’ rights,
deliver affordable warmth and zero emissions homes, and prevent and end
homelessness for good.
• The forthcoming Housing Bill, due to be introduced in 2024, which will create
powers for the introduction of long-term rent controls, creating new tenant
rights, and introduce new duties aimed at the prevention of homelessness.
66

Page 67

2.7 Our approach to customer involvement is inherently linked to a broader framework
of plans and strategies across the council including alignment with community
engagement work being progressed through Community Planning neighbourhood
plans. 
These strategies and plans include the: 
• Community Plan 2022-2032 which aims to make South Lanarkshire a better
place to live, learn, play and work and sets priorities in consultation with
customers.
• Community Engagement Framework which defines the approach to
consulting and working in partnership with communities throughout South
Lanarkshire.
• Council Plan - Connect 2022-2027 which was developed in consultation with
local people and groups and aims to improve the lives and prospects of
everyone in South Lanarkshire.
• HSCP Strategic Commissioning Plan 2022-25 which sets out the overall
plan for health and social care services across South Lanarkshire.
• Local Housing Strategy 2022-2027 which sets out how the council and its
partners will meet the range of housing needs of residents within South
Lanarkshire, including a commitment to developing a process to ensure tenant
involvement in Community Asset Transfer applications for land currently
owned by the Housing Revenue Account.
• Housing and Technical Resources Annual Resource Plan which sets out
the key strategic factors which influence housing and property services who
provide a housing service to customers.
• Annual Customer Scrutiny Framework which outlines the council’s
approach to customer-led scrutiny in assessing housing delivery and
identifying areas for improvement. 
2.8  The Customer Involvement Strategy 2024-29 complements and aligns with wider
partnership community engagement work which is being progressed to ensure
efficient and effective delivery of community and neighbourhood planning in South
Lanarkshire. 
2.9  Equal Opportunities 
We are committed to encouraging equal opportunities in everything we do. We will 
work to actively remove any barriers that stop customers getting involved and 
ensure that all customers have equal access and an opportunity to take part. 
To ensure that customers are treated fairly and are not disadvantaged in any way 
an Equality Impact Assessment (EQIA) will be carried out on this strategy to identify 
and mitigate any negative impacts and seek opportunities to promote equality. 
In relation to the Fairer Scotland Duty (FSD) we will actively consider how we can  
reduce inequalities of outcome caused by socio-economic disadvantage. A FSD 
and EQIA are being completed alongside the development of the Customer 
Involvement Strategy and these documents will be available for review in advance  
of the approval of the final  strategy. www.southlanarkshire.gov.uk. 
67

Page 68

2.10  Consultation and Engagement 
The Customer Involvement Strategy is developed and implemented with tenants,
customers, and wider stakeholders, and the council worked closely with the Tenant
Participation Coordination Group and staff to review the previous strategy and build
a shared understanding of areas to continue to take forward, areas to improve, and
new ideas to be implemented over the next five years.   
The consultative draft of the strategy was published on the South Lanarkshire
Council website alongside an online survey and promoted across social media
channels between September and December 2023.   
As part of the consultation process, the council has engaged directly with a wide
range of partners who provided constructive and positive feedback, including: 
• Discussions with tenants through the Tenant Participation Coordination
Group, Local Housing Forums/Neighbourhood Boards, and a series of local
engagement events, including Gypsy/Traveller sites and Sheltered Housing.
• Individual interviews with people with lived experience of homelessness.
• Stakeholders including the membership of the Autism Strategy Group,
Disability Partnership Housing sub-group, Seniors Together Executive
Group, and the Housing and Technical Resources Equality and Diversity
Coordinating Group.
• Engagement with Community Planning partners and local people attending
online discussion events.
• Engagement with representatives of a range of communities including
veterans and the armed forces, young people, carers, and care experienced
young people. 
Feedback on the draft Customer Involvement Strategy was positive, with strong
support for the proposed strategic objectives and actions to deliver them.  Key
feedback on the strategy included: 
• The need to ensure a range of flexible, local options for people to get
involved that recognises people’s different experiences and interests.
• The need to further develop engagement arrangements at a locality level to
meet customer’s needs and aspirations.
• Continuing to improve engagement with equalities groups across South
Lanarkshire, including young people, veterans and members of the armed
forces community, and carers.
• Ongoing promotion of the definition of ‘customer’ to make it easier for people
to understand their ability to participate.
• Building ongoing relationships with other local groups to make it easier for
them to share their views.
• Striking the right balance between virtual and face-to-face engagement.
• Further developing and embedding scrutiny in the service improvement
framework. 
68

Page 69

3.      Our approach to customer involvement 
3.1   Customer involvement and participation has continually progressed within South 
Lanarkshire. We recognise that not everyone wants to get involved in the same 
way or to the same extent and we have worked with customers to develop a wide  
range of ways for them to become involved as and when they wish. 
3.2   We recognise that the best way to ensure that customers are involved in shaping  
our housing services is to work in partnership and build on existing relationships, 
taking account of the positive contribution that customers can make. 
Appendix 3 sets out in detail our approach to customer involvement. 
3.3 The strategy aims to build on the existing range of local engagement opportunities,
including: 
• Tenant and Resident Associations.
• Local housing meetings across South Lanarkshire. 
• Sheltered Housing Forums in East Kilbride and Clydesdale.
• Homelessness lived experience group.
• Gypsy/ Traveller groups working to shape service development and site
improvement programmes at both council sites. 
• Drop-in sessions for young people in Blantyre.
• Housing involvement in Advice Surgeries in Blantyre, Burnbank and Larkhall
Engagement with locality community groups in Burnhill, Glespin, Law, Rigside,
Carnwath and Lanark.
• Regular walkabouts with tenants, housing officers, elected members, Police
Scotland and other partners in local communities across South Lanarkshire.  
4. Customer Involvement Strategy 2018-22: Progress and achievements 
4.1  The lockdown restrictions put in place in response to the Covid-19 pandemic
presented a set of unprecedented challenges the required a reconsideration of how
customer involvement activity would be delivered.  The inability of people to meet in
person impacted on the number of local groups remaining active across South
Lanarkshire, meaning we emerged from the pandemic with fewer groups in
operation to consult with.   
4.2 The middle period of the previous strategy was largely devoted to considering new
options for customer engagement, combatting the loneliness and isolation being
experienced by customers during the pandemic, and ensuring more people had
access to digital devices to aid communication and engagement. A significant
success was achieved in relation to this, with a switch in focus to:  
• Publishing a special edition of Housing news to all council tenants detailing
the temporary changes to key housing services and signposting to available
help and support. 
• Publishing specific newsletters for sheltered housing tenants and residents of
the council’s Gypsy/Traveller sites advising of temporary changes to their
services and signposting to available help and support.
69

Page 70

• Working with the SLTDSP to successfully apply to the Connecting Scotland
initiative to secure digital devices to allow tenant representatives on the
TPCG to engage with the council online. 
4.3 The challenges presented by the pandemic resulted in a significant expansion of
the use of online engagement platforms for customer involvement. This transition
has had a number of positive outcomes, including: 
• Efficiencies in seeking customer approval for council documents or
publications.
• Reduced travel time for customer representatives to attend meetings or
events.
• Improved ability of customers to participate in a way which takes account of
their own circumstances. 
4.4 The key learning from customer engagement during the pandemic has been
reflected within the new strategy, with key actions identified around reviewing local
engagement structures and working with partners to increase the range and
number of locality engagement opportunities including Registered Tenant
Organisations. The strategy also aims to progress this object through the right
balance between online, in-person and hybrid opportunities for involvement that
meet the needs and aspirations of customers.  Table 1 below sets out the progress
and achievements delivered during the last strategy. 
Table 1: Progress and Achievements 2018-22 
Strategic
Outcome
Progress and Achievements 2018- 2022 
Customers are
informed and
knowledgeable
Keeping customers informed on performance 
Information on how well the council is performing on issues
that matter to customers is published each year and promoted
through social media together with publications such as
Housing news and specific newsletters for Sheltered Housing
tenants and Gypsy/Traveller residents. 
The TPCG are provided with scheduled budget reports in
agreed accessible format and frequency. 
The housing sub-group of the South Lanarkshire Disability
Partnership helped shape the Local Housing Strategy 2022-27
and the revised Repairs Policy and Rent Management Policy. 
Delivery of independent advice and its outputs has been
provided to customers over the period of the strategy. This
enables customers to be informed on areas of strong
performance and areas where improvements are needed. The
council is committed to providing independent advice which
supports meaningful engagement with customers. 
Build customer understanding 
TPCG members visited the BE-ST factory in Blantyre to learn
more about the range of modern technologies available to
70

Page 71

Strategic
Outcome
Progress and Achievements 2018- 2022
support the transition to Net Zero, including high performance
insulation materials, zero emissions heating systems, and new
construction methods. 
Providing access
The council secured funding to provide access to digital
training and almost 200 tablets or other devices to customers
to ensure they can access information, submit benefit
applications, and attend online meetings and appointments. 
More customers
are involved
Ensuring access to information
More than 10,000 tenants opted into receiving information via
text or email, providing quick and easy access to
consultations, surveys, and other information, including: 
• rent setting
• key service messages
• online issue of Housing news 
Over 1,600 tenants participated in the council’s Tenant
Satisfaction Survey in 2022/23, sharing their views on a range
of topics including satisfaction with the quality of their home,
satisfaction with opportunities to participate in the decision-
making process, and satisfaction with the management of their
neighbourhood. 
During the strategy, 3,589 tenants participated in the annual
rent setting consultation. 
Customers help
to drive
continued
service
improvement
Facilitating effective engagement
The strength and resilience of the budget scrutiny approach
secured effective engagement in budget setting throughout the
pandemic, particularly when restrictions were at their highest. 
The Homelessness Services Users Group were involved in the
review to determine the future approach to the delivery of
homelessness commissioned services. 
Service improvement 
Tenant-led scrutiny programmes were re-established as
restrictions were lifted and new projects were delivered with
tenants being supported to review, report and make
recommendations for the further development and
improvement in the following service areas: 
• Virtual call handling.
• Homelessness information and advice.
• Gas servicing. 
71

Page 72

Strategic
Outcome
Progress and Achievements 2018- 2022
The council will continue to deliver annual programmes of
scrutiny-based activities to support service improvement.
.
Customers can
help to shape
change and
make a
difference
Gypsy/Travellers
Gypsy/Traveller residents continue to shape the development
and delivery of detailed site improvement plans which include
a new community facility at Shawlands Crescent, Larkhall,
cladding replacement on amenity units at both sites, new
decarbonised heating systems, extended pitch sizes, and
upgraded waste management at Shawlands Crescent,
Larkhall. The council’s joint work with Gypsy/Traveller
residents has been recognised with the receipt of two national
awards: 
• COSLA Excellence Award for ‘Excellent People,
Excellent Outcomes.
• Municipal Journal (MJ) award for ‘Innovation in
Building Diversity and Inclusion’.
Participatory Budgeting
During the strategy customers were involved in directing over
£1.7 million of funding through Participatory Budgeting across
housing services. In 2022-23 this included: 
• Projects to improve fencing, drying areas, bin areas,
communal paths and stairs, and communal gardens
across the 4 housing divisions.
• Internal and external upgrades to sheltered housing
including tenants voting for their preferred finishes such
as flooring, tiles, and wall coverings.
• Whitlawburn tenants and residents were involved in
determining the allocation of the Community
Endowment Fund, prioritising responding to the
increased cost of living through the provision of £100
food vouchers for local tenants, donating to the local
food pantry, and making donations to two local primary
schools.
• Gypsy/Traveller residents were involved in determining
priorities for the site Masterplans, contributing to the
designs for the new extended units, and selecting
preferred fixtures and fittings. 
Delivering on the commitments made in the Customer Involvement Strategy 2018-22
under lockdown restrictions during the pandemic was challenging for the council and
customers. However, it led to a number of key learning points to take forward into this
strategy to ensure continued customer involvement, including: 
72

Page 73

• Increasing the involvement of customers by offering a wide range of opportunities
to participate, offering flexible options that take account of people’s individual
circumstances.
• Expanding our reach by strengthening links with other customer groups across
South Lanarkshire, ensuring alignment and avoiding duplication of effort.
• Respecting the benefits of face-to-face meetings while offering a range of local
options for engagement that make more use of technology.   
5 Our strategic outcomes and priorities 
5.1 The Customer Involvement Strategy 2024-29 aims to build from the strong outcomes
achieved through the delivery of the previous strategy and taking account of the
learning from the pandemic period to consider how we continue to develop new ways
of working and new engagement structures to understand and meet the changing
needs and expectations of customers. This will be supported by the development of
the new Integrated Housing and Property Management System, which will enhance
the ability and scope for direct engagement with customers. 
5.2 The strategy aims to ensure the continued development of customer involvement
whilst also focusing on getting more customers involved and ensuring there are a
range of options and opportunities for this to happen. It sets out involvement which is
sharply focused on listening to customer feedback and ensuring this is reflected in
service delivery, improvement and increased customer satisfaction. 
5.3 The 4 strategic outcomes below set out what we want to achieve, with the overall
goal of further developing our approach and enabling customers to have realistic
opportunities to become involved and help shape housing services. To achieve each
of the strategic outcomes, there are a number of associated priorities which will be
progressed over the next five years. 
The strategic priorities for each outcome are: 
Strategic Outcome 1 - Customers are informed and knowledgeable 
Key priorities 
• Work with the Customer Publicity Group to assess and approve communication
intended for distribution to customers by awarding the ‘Customer Approved Stamp’
to highlight that they are clear, accessible and easy to understand. 
• Ensure ‘Housing news’ and ‘Sheltered Housing news’ articles continue to be
relevant and of interest to customers, including regular publication of performance
information and service improvement plans. 
• Ensure that our new tenant pack issued at the new tenant sign up is relevant,
captures frequently asked questions, and offers key contact details. 
• Continue to work alongside local Gypsy/Traveller residents to deliver and further
develop site masterplans. 
73

Page 74

• Continue to publicly report service performance in an accessible way and provide
comparisons with other social landlords. 
• Further develop the council website to reflect best practice in customer
engagement and to raise awareness of opportunities to become involved by
promoting customer feedback through ‘real time’ surveys and by developing more
customer self-serve options. 
• Continue to expand the use of social media to encourage greater knowledge and
understanding of housing services and performance and to encourage more
customer feedback. 
• Promote awareness of the wide range of opportunities for customer involvement. 
• Work with customers to ensure that the new IT system is developed to further
improve customer engagement. 
• Review resources for customer involvement to ensure they reflect the needs and
aspirations of customer groups. 
Strategic Outcome 2 - More customers are involved 
Key Priorities 
• Encourage involvement and feedback from less engaged groups of customers. 
• Work with customers to review structures for engagement at a local divisional
level, including local forums, estate walkabouts, housing surgeries and drop-ins to
strengthen engagement at a local level. 
• Continue to develop participation with other local groups such as neighbourhood
boards, community councils and other tenant organisations. 
• Further develop and promote a programme of local estate walkabouts. 
• Establish customer panels as an alternative way for interested individuals to
become involved and provide views and feedback. 
• Undertake an awareness raising programme for all customer scrutiny activities to
encourage customer participation in them. 
• Develop and improve engagement opportunities with young people. 
• Develop and improve engagement opportunities with homelessness service users. 
• Develop and improve engagement opportunities with veterans and members of
the armed forces community. 
• Continue to provide appropriate learning and training opportunities for customers
to improve knowledge and confidence to assist them to become effectively
74

Page 75

involved, appraising options for new briefings, seminars, and annual customer
conference. 
Strategic Outcome 3 – Customers drive continuous service improvement 
Key Priorities 
• Revise the Tenant Scrutiny Framework to widen the range of customer groups
involved, including older people, homelessness service users and
Gypsy/Travellers. 
• Consider options to further develop scrutiny recommendations by the council. 
• Deliver an annual programme of customer scrutiny through the Customer Scrutiny
Group. 
• Consider links with the South Lanarkshire Council People’s Panel as an additional
route to drive service improvement. 
• Ensure reports to Housing and Technical Resources Committee highlight the
contribution and influence of customers in developing recommendations.  
• Resource and Service Plans to confirm the involvement and influence of
customers in prioritising actions and measures. 
• Gypsy/Traveller residents continue to be involved in the implementation of site   
masterplans. 
Strategic Outcome 4 - Customers shape change and make a difference 
Key Priorities 
• Include ‘You Said, We Did’ feedback to customers via ‘Housing news’, the council
website, social media platforms and annual reports to customers highlighting the
difference made by customer involvement. 
• Analyse and report on feedback from customer satisfaction surveys including
marginalised service users, for example, Gypsy/Travellers, homelessness service
users and ensure that it is used to influence service planning and delivery. 
• Explore and implement a system to track and evaluate involvement activities from
all customer groups and the resulting effect.
75

Page 76

• Review independent advice and support for customers to ensure it provides for
needs of all customer groups. Use customer surveys, comments and complaints to
inform how the council can improve the service. 
6 Resourcing and supporting customer involvement 
6.1  We recognise that adequate funding and support is essential to ensure effective and
meaningful customer involvement. We are therefore committed to providing
resources for this. The strategy will be supported through the Housing Revenue
Account from within existing resources. Resource requirements and priorities will be
continually monitored. 
6.2  Detailed below is a breakdown of direct spend in relation to tenant participation in
South Lanarkshire for the financial year 2022/23. This figure does not include costs
for council staff resources. 
Details          £ 
South Lanarkshire Tenant Development Support Project  90,409 
Contracted consultant (surveys and quantitative/qualitative  47,947 
Research) 
Production of Housing News publications     24,742       
Tenants Information Service membership      2,000 
Meeting costs – room hire, catering, equipment     1,278 
Annual grants paid to tenant and residents group       500 
Total expenditure  167,189 
7      Monitoring, evaluation and review 
7.1 The strategy action plan (Appendix 2) outlines how the strategic outcomes that
guide our vision for success will be delivered over the next five years. 
7.2 Effective monitoring and evaluation is essential if we are to assess the success of
the strategy and ensure that we achieve the required outcomes. 
7.3 The TPCG is responsible for overseeing the implementation and ongoing
monitoring of the strategy. A report on progress against the action plan will be
prepared and discussed with the group twice per year. In addition, the group has
responsibility for identifying issues that require to be reflected in the annual review
of the strategy.
76

Page 77

7.4 The TPCG will also monitor and review the financial spend in relation to the
strategy. 
7.5 The action plan will be reviewed annually and action planning for the future years
developed as appropriate. The findings from the review and progress on the
implementation of the strategy will be reported to: 
• Housing and Technical Resources Committee.
• Housing and Technical Resources Resource Management Team.
• Housing Services Management Team.
• Tenant Participation Coordination Group. 
• Tenant and resident groups. 
7.6 We will also publish annual customer involvement and participation achievements in
‘Housing news’, on the council website and through social media platforms. 
77

Page 78

Appendix 1: Ways to get involved 
The table below highlights the range of options for involvement and shows the level of
customer commitment required in relation to each option: 
Low Medium High
Surveys/questionnaires Tenant and Resident
Groups
Tenant Participation Co-
ordination Group and
associated sub groups 
Annual Budget and Rent
Setting consultation
Continuous
Improvement Groups
Customer Scrutiny
Group
Annual sheltered housing
meetings
Sheltered Housing
Forum
Customer Publicity
Group
Consultations Focus Groups
Budget Scrutiny Group Open meetings on
‘standalone’ issues 
Comments, compliments and
complaints 
Interested Individual Register  
Walkabouts  
Housing surgeries and drop-
ins   
78

Page 79

Appendix 2: Action Plan 2024-2029 
Strategic Outcome 1
Customers are informed and knowledgeable 
Number Objective Action Timescale
1.1  Work with the Customer
Publicity Group (CPG) to
assess and approve
communication intended for
distribution to customers 
• Annual programme of
documents/publications to be
considered for ‘Customer
Approved’ Stamp to be agreed and
linked to the Areas for Customer
Involvement 
• CPG to meet as required to assess
publications
2024-25
onwards 
1.2 Continue to publish articles of
interest to tenants,
performance information, and
service improvement plans in
‘Housing news’ and
‘Sheltered Housing news’ 
• Agree arrangements to ensure
customer involvement in each
edition of ‘Housing news’ and
‘Sheltered Housing news’
• Use ‘Housing news’ and ‘Sheltered
Housing news’ to feedback on
customer consultation/participation
and how this will be used to shape
service delivery
2024-25
onwards 
1.3 Report on landlord
performance and provide
comparisons in relation to
other social landlords 
• Publish a landlord performance
report in consultation with tenants
and in line with Scottish Social
Housing Charter (SSHC) guidelines
• Provide comparison of performance
in relation to other social landlords
through ‘Housing news’ and council
website
Annually by
November
each year 
1.4 Further develop the council
website to reflect best
practice in customer
engagement and to raise
awareness of opportunities to
become involved
• CPG to review and make
recommendations for improvement
to content and information
• Undertake online consultation
where appropriate 
2025/26
1.5 Further develop the use of
social media to encourage
greater knowledge and
understanding of housing
services and performance
and to encourage more
customer feedback
• Review existing approach and
identify opportunities to further
develop communication with and
involving customers through use of
text, email and social media
2024-25
onwards
79

Page 80

Number Objective Action Timescale
1.6 Promote awareness of the
range of opportunities for
customer involvement
• Publicise and encourage
attendance at events to raise
awareness and promote networking
opportunities
• Continue to involve customer
groups such as those identified at
4.1, to ensure effective customer
engagement 
2024-25
onwards
1.7 Co-produce annual calendar
highlighting customer
involvement activities and
events
• Publish programme of participation
opportunities throughout the year
on the council website, including
meeting dates, surveys, and
consultations 
2024-25
onwards
1.8 Independent advice • Review independent advice and
support for customers to ensure it
meets the needs and aspirations of
all customer groups 
• Review approach to supporting
customers to ensuring effective
customer involvement 
2024-25 
Strategic Outcome 2
More customers are involved 
Number Objective Actions Timescale
2.1 Encourage involvement and
feedback from less engaged
groups of customers, e.g.
young people, minority ethnic
communities, carers and
veterans and members of the
armed forces community 
• Use customer profile information to
identify less engaged customer
groups
• Review good practice elsewhere
and Identify opportunities to target
specific engagement with specific
groups of customers
• Review, update and promote
interested individual database
2024-25 
2.2 Undertake an awareness
raising programme for service
improvement and customer
scrutiny activities to
encourage active participation
in them 
• Develop a programme of scrutiny
opportunities
• Produce final reports
• Recruit customers for future
scrutiny activities through
Customer Scrutiny Framework
2024-25
onwards 
2.3 Continue to engage with
Gypsy/Travellers 
• Annual focus group meeting with
Gypsy/Travellers at Shawlands
Crescent, Larkhall
• Quarterly meetings with
Gypsy/Travellers at Springbank,
East Kilbride
2024-25
onwards 
80

Page 81

Number Objective Actions Timescale
2.4 Develop and improve
engagement opportunities for
young people
• Arrange workshop with Youth
Council to identify how they wish
to be involved
• Explore and identify where existing
groups and activities exist that are
engaging with young people
• Develop the use of social media to
target views of young people 
• Establish new engagement
arrangements to reflect feedback
from young people 
2024-25
onwards 
2025-26
2.5 Develop and improve
engagement opportunities for
homelessness service users 
• Continue to engage with
customers using homelessness
services
• Ensure annual scrutiny
programme includes specific
consideration of homelessness
service 
• Ensure opportunities for
homelessness service users to
become involved in wider
participation opportunities 
2024-25
onwards 
2.6 Continue to provide a range
of training opportunities 
• Develop and publicise annual
training programme to ensure that
customers have the knowledge,
skills and confidence to become
involved
• Consider the development of a
series of new briefings and
seminars to support customer
engagement 
2025-26
onwards 
2.7 Annual customer conference • Engage with customers to
appraise options for an annual
customer conference in South
Lanarkshire 
• Implement annual event reflecting
outcome of consultation 
2025/26 
2026/27
81

Page 82

Number Objective Actions Timescale
2.8 Local engagement
arrangements
• Review of divisional engagement
arrangements
• Work with customers to review
arrangements for engagement at
a divisional level, including local
forums and estate walkabouts to
strengthen engagement at a local
level. 
• As part of review ensure
appropriate linkage with wider
community engagement
structures including:
➢ Hareleeshill Community 
Growers
➢ Whitehill Neighbourhood        
Board
➢ Burnhill Action Group 
2024-25
onwards 
Strategic Outcome 3 
Customers drive continuous service improvement 
Number Objective Actions Timescale
3.1 Deliver an annual programme
of customer scrutiny through
the Customer Scrutiny Group
(CSG) 
• undertake and report on two
scrutiny activities each year 
• encourage active participation in
the scrutiny activities
• extend the scope of the scrutiny
programme to other customer
groups, including people using
homelessness services,
Gypsy/Travellers
2024-25
onwards 
2025-26 
3.2 Explore option to establish a
scrutiny panel for older
people 
• Develop a proposal for an Older
People Scrutiny Panel 
• Advertise on social media looking
to establish a scrutiny panel for
older people
• Consult with tenants via local
sheltered housing forum 
2026-27
onwards 
82

Page 83

Strategic Outcome 4 
Customers shape change and make a difference. 
Number Objective Actions Timescale
4.1 Ensure regular ‘You Said, We
Did’ feedback to customers
via ‘Housing news’, the
council website and annual
report to customers
highlighting the difference
made by customer
involvement
• Produce ‘You Said, We Did’ report
annually
2024-25
onwards 
4.2 Analyse and report on
feedback from customer
satisfaction surveys and
ensure that it is used to
influence service planning and
delivery. 
• Review and agree approach to
how satisfaction results are
reported 
2024-25
onwards 
4.3 Further develop system to
track and evaluate customer
involvement activities and the
resulting effect
• Explore options to track feedback
from customers on their
involvement and resulting effect
• Work with customers to ensure
that system enhances
engagement with customers
• Develop and implement system 
2025/26 
4.4 Ensure customer involvement
in identifying local priorities to
be progressed through
Participatory Budgeting 
• Ensure effective customer
involvement in identifying estate in
directing spending in relation to
the Estate Improvement Budget
and the Environmental aspect of
the Housing Improvement Budget.
• Report Participatory Budgeting
activity to Area Committees
annually 
2024-25
onwards 
4.5 Independent Advice and
Support • Review independent advice and
support
• Review funding arrangement for
customer groups and individuals
2024-2025
onwards 
83

Page 84

Appendix 3: Our approach to customer involvement 
Service Improvement and Customer Scrutiny 
• Tenants are involved in delivering service improvement through our tenant-
led customer scrutiny programme which provides an active role in reviewing
how housing services are being delivered and how they can be improved.
Our customer scrutiny framework sets out the role of customers, staff and
elected members in working together to deliver self-assessment and service
improvement and puts customers in the driving seat to evaluate how well
housing services are performing and to work together to achieve change.
• Over the life of the Customer Involvement Strategy, we will extend our
approach to scrutiny, involving other customer groups such as people using
homelessness services and residents of Gypsy/Traveller sites. 
Participatory Budgeting 
• Tenants are involved in directing spending by housing services through the
council’s approach to Participatory Budgeting (PB), a method of giving local
people the opportunity to decide where public money is spent in their
communities. PB is an effective community engagement tool, rather than
merely a different means of allocating resources.
• Housing and Technical Resources continues to make a positive contribution
to the council’s PB programme through the environmental aspect of the
Housing Investment Programme, the Estate Improvement Budget, the
commissioning element of the Community Safety Budget, the Independent
Advice contract, and the Whitlawburn Regeneration Endowment Fund.
• Tenant involvement in PB has led to improvements to sheltered housing and
Gypsy/Traveller sites, tackling the cost of living for local customers, local
projects including improvements to bin and drying areas, and communal
paths and gardens.
Collaborative approach to engagement on the housing budget 
• The Budget Scrutiny Group (BSG) provides a vehicle for developing,
delivering and reviewing engagement with customers on the financial issues
facing the housing service on an ongoing basis. This includes overseeing the
annual process for consulting on the housing budget.
Annual programme of consultation and involvement 
• Customer engagement priorities agreed with the TPCG.
• Policy/strategy review programme agreed with customers.
• Customer priorities in service and policy reviews reflected in the service level
planning process. 
84

Page 85

Engagement at a local level 
•  Support to tenant and resident groups to operate effectively and to become 
involved collectively at a local level.
•  Annual training programme provided by SLTDSP, developed in consultation with 
customers.
•   Register of tenant organisations available on our website. 
Information and advice 
• Range of information provided to customers on housing and related services.
• New tenants provided with information about opportunities to become 
involved.
• ‘Housing news’ produced biannually and distributed to all council tenants.
• Regular publication of newsletters for Sheltered Housing and 
Gypsy/Traveller sites.
• Range of briefings and reports provided by SLTDSP for customers. 
Individual customers 
•  Database of individuals who have expressed an interest in being involved. 
This is viewed by the SHR as a good way for customers to become involved 
and engage with the council.
• The increased use of text and email with customers has provided additional
options for customers to engage with the council. 
85

Page 86

Glossary  
Customers tenants, future tenants, homeless people and others who
use housing services
Customer Involvement customers taking part in decision making processes and
influencing decisions about housing and related services
Customer Scrutiny giving customers the ability to hold their landlord to
account by working in partnership to achieve better
performance and improve outcomes
Expenditure money the council spends on running costs e.g., office
costs, staff wages, repairs
Housing Revenue Account a separate account held by the council for money
collected from council house rents and spent on repairing,
maintaining and improving council housing
Housing (Scotland) Act 2001 legislation written by the Scottish Government which
housing providers must apply
Mystery Shopper customers using council services to collect information
about how good the service is
Outcomes the change or difference made in the result of an action
Registered Tenants
Organisations (RTOs)
groups set up by tenants of an area, that have a written
constitution and committee, and have registered their
details with their social landlord 
Resources money, people or property which the council or another
body can use to do its business
Scottish Housing Regulator an independent body which looks after the interests of
people who are or may become homeless, tenants of
social landlords, or users of the services that social
landlords provide
Scottish Social Housing Charter the standards and outcomes that all social landlords,
should aim to achieve
Social Landlord a landlord who manages non-commercial housing, usually
a local authority or housing association
South Lanarkshire Tenant
Development Support Project
(SLTDSP)
provides independent, impartial advice, guidance and
support to customers in South Lanarkshire on housing
and related matters
Tenant Information Service (TIS) provides independent advice, support, and training for
tenants and landlords across Scotland
Tenant Participation Advisory
Service (TPAS)
promotes good practice in tenant participation,
engagement and empowerment 
If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk
86

Page 87

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: Homelessness Pressures - Impact and Proposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Housing and Technical Resources Committee on the challenges
resulting from unprecedented demand for statutory homeless services including
temporary accommodation and
 highlight actions being progressed and proposed in mitigation
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]h
(1) that the scale and nature of the increase in demand for homelessness
assistance both nationally and locally, be noted
(2) that the pressure and impact within South Lanarkshire, stemming from the
increase, which is above those being experienced nationally, be noted
(3)  that the mitigation measures in place, be noted; and
(4) that the proposed further actions detailed at section 5 of this report, be noted 
[1recs] 
3. Background
3.1. Local authorities have a range of legal duties in responding to homelessness which 
includes securing settled housing. 
3.2. Locally, the Council and its partners have a strong track record of effective delivery of
homeless services.  The commitment to preventing and alleviating homelessness has
been a continuing strategic focus for over 20 years, clearly set out within the Local
Housing Strategy and Community Plan along with other key Council and partner
strategies. 
3.3. In October 2017, the Scottish Government established the Homelessness and Rough
Sleeping Action Group (HARSAG) to develop solutions to end homelessness.  Final
recommendations included a requirement for local authorities to develop a 5-year
Rapid Re-housing Transition Plan (RRTP), setting out the local context and detailing 
actions which partners would take to achieve a step change in reducing
homelessness. 
3.4. The amount of funding provided (£2.66 million) by the Scottish Government to support
delivery of the South Lanarkshire RRTP was significantly less than the amount (circa
£14 million) which the plan had estimated was required. 
11
87

Page 88

3.5. Notwithstanding the significant shortfall in funding, tangible success was achieved in
the early years of the plan (years 1 to 3) through a combination of:- 
 effective use of additional funding directed towards increased prevention activity
 additional support to meet complex needs
 flipping temporary accommodation to permanent housing to meet individual need
 a renewed focus on a partnership approach; and 
 success of wider existing plans delivering additional housing stock 
3.6. The fourth year of RRTP 2022/2023, however, proved extremely challenging both
locally and nationally, with national statistics reflecting homelessness at the highest
level since current statistics began in 2002.  Moreover, the increase was significantly
more pronounced within South Lanarkshire (19% v 9%) than Scotland as a whole. 
This increase has resulted in a wholescale reversal on the previously reducing trend
in relation to the level of homelessness and has also placed extreme strain on local
services and budgets.  Indeed, the scale of the demand experienced in 2022/2023
resulted in an overspend in the homelessness budget. 
3.7. The overall caseload for duty to offer secure accommodation increased by 46% from
a record low point below 860 during 2021, to 966 by the end of March 2022 to 1,407
by March 2023. 
3.8. The timescale to resolve homelessness, reduced through the first 3 years of the RRTP
to 210 days in March 2022, increased to 238 days by November 2023.  In essence,
the positive progress made in reducing homelessness over the first 3 years of the
RRTP was completely undone in 2022/2023. 
3.9. The annual RRTP review, approved by Housing and Technical Resources Committee
on 30 August 2023, noted the scale and impact of the reversal experienced in the year
and reconsidered ambitious 5-year targets to significantly reduce homelessness and
caseload backlog to a new target to reduce or maintain current levels within
2023/2024. 
3.10. The end of the fourth year of RRTP coincided with significant debate at a national level
regarding the extreme pressures on the housing and homelessness system, this
included the following:- 
 publication of a thematic review of homeless services by the Scottish Housing
Regulator (SHR) in February 2023.  This emphasised the efforts being made by
local authorities in incredibly challenging circumstances, highlighting that some
local authorities were at point of systemic failure.  The report noted 3 major
strategic challenges:- 
 dealing with the significant numbers of people in temporary accommodation
 maintaining a sufficient supply of appropriate temporary accommodation
 ensuring access to the required number of permanent homes 
 in July 2023 Solace, in collaboration with the Association of Local Authority Chief
Housing Officers (ALACHO), produced a report ‘Housing in Scotland: current
context and preparing for the future’ which set out a wide range of concerns
including a chronic shortage in supply of affordable housing, increasing demand
trend projected to continue and risk to delivery of new build at scale required
culminating in a housing emergency in Scotland 
88

Page 89

 Argyle and Bute, City of Edinburgh and Glasgow City Councils declared housing
emergencies within their respective authorities in 2023 
 in November 2023, the SHR published a further update highlighting the risk that
a systematic failure has now been realised with wider significant failure to meet
statutory duty and ongoing risk nationally 
 the increase in demand noted above has continued into 2023/2024.  This has
further exacerbated the acute pressure on resources and increased the likelihood
that the Council will be unable to meet statutory duties.  Moreover, it is clear in
the current operating context that a significant downturn in performance and 
increase in service costs is now anticipated 
3.11. As local authorities and partners increasingly raised concerns over pressure in the
homeless system, the Scottish Government established a short life Housing Review
Group in June 2023.  The focus being to consider the recommendations of Solace,
explore opportunities to increase affordable housing supply and maximise existing
supply to meet demand.
3.12. Despite widespread consensus on the key drivers behind increased demand pressure
and the scale of the concern reflected in national statistics, there is ongoing uncertainty
regarding the national response including resources to ensure local authorities meet
statutory duties. 
3.13. Core funding of homeless services reduced during 2022/2023 despite the increased
demand and associated costs to manage services. 
4.  Local Issues and Actions 
4.1. The continuing scale of increased demand is illustrated through the following statistics
which compare the position at the end of November 2023 with the corresponding
period in the previous year:- 
 homeless presentations have increased by a further 15% (1,786 v 1,547)
 there has been a further 14% increase in duty to accommodate (1,461 v 1,287)
 the number of households homeless has increased by 47% (1,542 v 1,047) 
4.2. This has created a significant pressure on resources, increasing the likelihood the
Council will struggle to meet statutory duties and maintain performance and costs in
relation to key aspects of the homeless service. 
4.3. There is no standout reason for increased homeless presentations, the most common
reason for homelessness continues to relate to people who have been ‘asked to leave
parental home’ accounting for 18% of all homeless presentations, closely followed by
relationship breakdown at 17% of all presentations. 
4.4. Whilst proportionate increases can be seen across reasons for homelessness in the
current year, over the last 3 years there are notable differences within the private
sector with an increase in the levels of private rented loss of accommodation across
subcategories, eg, landlord leaving the sector, a 150% increase over 3 years from 1
in 25 households to 1 in 10 since 2020/2021. 
89

Page 90

4.5. In the year to date (2023/2024), 196 homeless presentations resulted due to the loss
of a private sector tenancy, this accounts for 11% of all homeless presentations.  At
the same time, challenges accessing the private rented sector is contributing to
additional demand, with limited supply against high demand for available properties
further limiting housing options. 
4.6. Among the other factors contributing to the increase in homelessness are:- 
 the removal of consideration of local connection within Scotland in November
2019 leading to out of area presentations (c100 in current year to date); and 
 significant housing need arising from humanitarian programmes which has been 
considerably above the expected local commitment 
4.7. Whilst the Council and other local authorities have an ongoing commitment to assist
humanitarian need and recognised success in its strong partnership approach to
resettlement, the increasing and various streams of demand through refugee and
asylum programmes is concerning and projected to continue and grow. 
4.8. This includes housing need related to the mandated National Transfer Scheme for
young unaccompanied asylum seekers and adult asylum dispersal, for which the
authority has 1 hotel accommodating c100 asylum seekers.  This is in addition to
community placements and the ongoing expectation of a 6% contribution to meeting
the needs of Scotland’s refugee resettlement need.  In 2021, estimated refugee
resettlement was approximately 30 households annually although this significantly
increased in the last 18 months with 83 Ukrainian refugee households resettled in
social housing. 
4.9. Pressure in the system was further impacted by severe winter weather and unusually
high decant requirements resulted in significant pressure in the void property
management system increasing demand for temporary accommodation. 
4.10. During 2022/2023, the greatest increase in temporary accommodation was B&B
placements which increased by 89.8% (not including decant placements) compared
to the previous year, albeit starting from a very low level of only 30 placements during
2022/2023. 
4.11. Alongside increased demand for temporary accommodation, demographics are
expanding.  Notably, more households approaching the Council for homeless
assistance are in work and in receipt of no or only partial housing cost assistance
impacting on their ability to cover temporary accommodation costs, again risking
homeless business plan outturn against projections. 
4.12. Pressure can be seen in performance outcomes including waiting times for homeless
appointments, albeit same day appointments are maintained for urgent need cases.
The authority has also breached the unsuitable accommodation order on 8 occasions
year-to-date in 2023/2024, from a long-standing position of full compliance. 
4.13. It is worth noting that South Lanarkshire remains a top performing local authority. 
Whilst areas of performance have certainly deteriorated, this is from a strong starting
position and the Council continues to compare well against peers, albeit this is
nationally a deteriorating position. 
90

Page 91

4.14. The continuing increasing demand trend and pressure on resources including staff
managing significantly higher caseloads with no additional resource and budgetary
pressure, are a significant concern for future service delivery and ability to meet
statutory duties. 
4.15. Based on 2022/2023 trends, temporary accommodation modelling suggests a
requirement to let 92% of available lets to Urgent Homeless Households to
significantly reduce the homelessness backlog over the next 5 years.  This is not an
appropriate approach long term, taking account of the increasing level of lets directed
to resolve homelessness over recent years, currently approximately 70% of all lets
due to the level of demand.  Meanwhile, the backlog is increasing and wider need is
not met.  Another consequence is limited turnover of housing stock lets to the transfer
list would generate and risk of encouraging homelessness as the only route to access
secure housing. 
4.16. Consistent with SHR’s thematic review, the key issues fall into 3 main categories:- 
Dealing with the significant numbers of people currently in temporary
accommodation
 prevention is proving increasingly difficult as the private sector market is proving
to be less accessible or sustainable for customers
 reasons underpinning increased demand are linked to the ongoing cost of living
crisis, decline of the private rented sector and out of area demand
 the service continues to assist through direct financial and practical support to
sustain tenancies, early housing options advice, prevention for vulnerable groups
via housing pathway planning and working in partnership with neighbouring
authorities to minimise and effectively plan for out of area presentations
 reduced stock turnover from 7.59% of properties becoming available for let in
2021/2022 to 7.12% in 2022/2023 further limits the availability of properties to
meet the growing urgent homeless waiting list (a reduction of 108 lets)
 permanent lets to meet demand from humanitarian programmes is further
exacerbating overall housing demand, the shortfall in lets to meet domestic
homelessness now resulting in increasing amounts of time spent in temporary
accommodation 
Maintaining a sufficient supply of appropriate temporary accommodation
 demand has grown significantly beyond previous trends or projections in short
space of time, therefore, supply has increased as far as possible at speed
 this limits opportunities to flip or meet wider need and ambitions, eg, prevention
via pathway plans or Housing First, as demand for temporary drives planning
 incurring breaches of unsuitable accommodation order, albeit low level year-to-
date is a change from the Council’s long standing position of full compliance
 significant increase in costs associated with provision of temporary
accommodation and concern for homeless business plan, related to volume but
also increased costs overall
 recently introduced emergency furnished properties to reset culture and end
unintended consequences of reliance on hotel accommodation, early indications
are this approach is proving successful in meeting emergency need as well as
cultural shift 
Ensuring access to the number of permanent homes
 lets to the urgent homeless list have been maximised at almost 70% of all lets
excluding amenity and sheltered amounts to almost all available lets 
91

Page 92

 increased Registered Social Landlords (RSL) contribution at 44% of all lets, the
highest individual organisation at 55.90%
 continuing new build will be key to meeting overall housing need in the medium
to long term
 affordable Housing Supply Buy Back target was doubled during 2023/2024
delivering short term increase in stock, targeting East Kilbride as the most
pressured housing area.  This approach will continue in the early years of the
Strategic Housing Investment Plan (SHIP) 2023 to 2027
 continuing the Council’s approach to balancing consideration of housing need
against community cohesion through Local Letting Plan approach
 in the coming year, considering the ongoing high and increasing demand for
homelessness, increasing backlog and inability to reduce or clear backlog with
current rate of lets, exploring opportunity to generate turnover and meet wider
housing need through increase of transfer lets directing secondary let to
homeless list 
5. Next Steps
5.1. Having considered all available statistical information, actions across wider authorities
and the detail of national discussions, the following actions to address the emergency
homeless situation in South Lanarkshire have been identified:- 
 review and revise the Council’s approach in response to homelessness ensuring
clarity of offer (advice and suitable accommodation to resolve homelessness) to
manage expectations from first contact
 end repeat offers of temporary accommodation related to challenging behaviour
in favour of revised enhanced Promoting Positive Behaviour approach
 work with customers to ensure that they are queuing for a range of areas which
will enable them to be housed within a reasonable period.  This would involve
individuals being asked to select whole housing locality areas and not selective
letting areas (by exception ability to negate streets)
 remove opportunity to select house/heating types (by exception ability to negate
based on criteria)
 applicants with minority access to children are queued for multistorey properties
 continue pilot of use of furnished properties as emergency accommodation 
 continue work to increase core temporary accommodation options (first stop for
East Kilbride and supported project)
 consider reduced lets to urgent homeless applicants in favour of transfer list lets
to generate turnover and improve ability to meet wider housing need
 convene meeting of Head of Housing and Chief Executive of RSLs to further
discuss national and local issues and requirements
 continue active participation in national discussion and working groups
 continue engagement with the Scottish Government 
5.2. A consideration of opportunities to minimise the impact of homelessness on the most
vulnerable has taken account of the trauma homelessness can have on a child.  In this
context, the service will ensure that a particular focus is now placed on the needs of a
child in the allocation of housing as work continues to tackle the backlog of
homelessness. 
5.3. As noted earlier, the increased demand trend has continued through the first half of
2023/2024 with no reduction in sight, taking account of the key drivers being the
ongoing cost of living crisis and private sector housing market conditions, which is
impacting on the cost-of-service delivery.
92

Page 93

5.4. The emerging gap between core homelessness funding and actual delivery costs to
meet significant increased demand is a concern for the homeless business planning
process and future service delivery.  This includes delivering on plans to ensure long
term adequate supply of compliant temporary accommodation and minimising
wasteful spend, such as unsuitable hotel accommodation. 
5.5. It is proposed that a communications strategy will be developed to accompany a
review of personal housing plans for existing homelessness households in a planned
programme and all new households at initial contact stage.  Progress will be monitored
via the range of partnership groups including Local Housing and Homeless Strategy
groups.  Engagement in national discussion with also continue via Solace, ALACHO
and the range of homelessness and humanitarian groups. 
6. Employee Implications
6.1.  There are no employee implications arising from the content of this report. 
7. Financial Implications
7.1. The current out-turn in the homelessness budget projects that the service will deliver
on budget, therefore, maintaining current reserves level at £1.5 million (ring fenced for
development of accommodation) following management actions to reduce costs.
However, this is a fragile position, any surge in demand will increase costs and the
service is operating at increased cost with reduced funding and uncertainty over longer
term funding, a risk to business planning and the quality of service moving forward. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment implications
arising from this report. 
9. Other Implications
9.1. There are no other implications arising from the content of this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. There is no requirement to equality impact assess the content of this briefing paper or
perform consultation. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
5 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Good quality, suitable and sustainable places to live 
Previous References
 None 
List of Background Papers
 2022/2023 Annual Rapid Rehousing Transition Plan
 2022 to 2027 Local Housing Strategy 
93

Page 94

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jacqueline Fernie, Homelessness and Housing Support Manager 
Jacqueline.fernie@southlanarkshire.gov.uk
94

Page 95

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:  Lease of Proposed Development - Lanark Community
Workshop at Lanark Racecourse 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise on action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Housing and Technical
Resources), in consultation with the Chair and an ex officio member to approve the
granting of a lease of the proposed Lanark Community Workshop at Lanark
Racecourse to Lanark Lanimer Committee
[1purpose]
2. Recommendation(s)
2.1.  The Committee is asked to approve the following recommendation(s):- 
(1) that the following action taken, in terms of Standing Order No 37(c), by the
Executive Director (Housing and Technical Resources), in consultation with
the Chair and an ex officio member, be noted; and
(2) that the authority granted to the Executive Director (Housing and Technical
Resources), in conjunction with the Head of Administration and Legal
Services, to conclude matters and to enter into the necessary legal
agreements in terms of the principal conditions contained in Section 4.6 of this
report and terms which are in the best interests of the Council, be noted.  
3. Background
3.1.  In October 2015, South Lanarkshire Council applied to the Scottish Government’s
Regional Capital Grant Fund (RCGF) to support the development of a Clydesdale
Rural Development Centre in Lanark.  The Council received the formal offer of grant
on 19 May 2016 for £1 million against a project cost of £2 million, the remaining funds
coming from other grants. 
3.2.  The project that was submitted followed a community consultation, market appraisal
and preparation of a detailed feasibility plan working with organisations including
Lanark Lanimer Committee, a potential tenant for the community facilities portion of
the project.   
3.3. During 2016, negotiations to purchase the original identified site, the former Alston’s
Yard, reached an impasse and the project could not be delivered at this location.  Other
locations were also considered, however, again these could not be delivered. 
Consequently, there was a need to explore other options and identify an alternative
site to fulfil the intention of the grant and deliver a workable project for the town.   
12
95

Page 96

3.4. An opportunity at the Racecourse, on the site of a demolished building has been
identified as the best solution.  This opportunity has been discussed with the Scottish
Government who has confirmed it is content for the project to be progressed. 
Discussions have also taken place with community representatives and potential
occupiers who have all indicated their support, in principle, for the revised project. 
4. Proposals
4.1. The Scottish Government has recently confirmed its agreement to the Council, in a
revised offer, to deliver the Community Workshop.  The site, part of the Common
Good, comprising the footprint of a former stable block, currently a concrete pad, soft
landscaping and car parking area, is of sufficient size to accommodate the building to
be constructed.  Planning consent has been obtained, reference P-23-0015. 
4.2. The change of site and the scale of investment has changed and therefore, the revised
project outputs are now:- 
 500m² of storage space for Lanark Lanimer Committee 
 500m² of brown field land redeveloped 
Community and Enterprise Resources (Enterprise and Sustainable Development
Services) advise that progressing the project on the above terms will deliver these
objectives. 
4.3. The community benefit from the Lanark Lanimer Project was assessed as if under the
Community Asset Transfer process and qualifies for a 77% discount to the market
value (rental).  Prior to committing to the construction of the new building, negotiations
have been ongoing to agree the terms of occupation with Lanark Lanimer Committee.
Although this is not a Community Asset Transfer, the Lanark Lanimer Committee
asked that the Council takes into account the role it plays within the local community
and the community benefits when setting the rent. 
4.4. The market value of the building, when complete, would be £16,000 per annum.  At a
77% discount, the rental would be £3,680 per annum. 
4.5. In addition, in return for the fit out of the building being completed at the Lanark
Lanimer Committee’s expense, a 5 year rent-free period has been requested. 
4.6. The proposed principle lease terms for the lease to the Lanark Lanimer Committee
are:- 
1. Premises - the completed building to be constructed at Lanark Racecourse in
accordance with planning reference P-23-0015
2. Repairs - the tenants to be responsible for repairs
3. Insurance - the Council will insure premises with premium recoverable from the
tenants
4. Rent – £3,680 per annum (exclusive of VAT)
5. the rent to be fixed at £1 per annum for the first 5 years 
6. Rent reviews – rent to be reviewed to 23% of market rental after first 5 years and
by RPI 5 yearly thereafter 
6. the tenants to be responsible for all rates and utility charges
7. Use – industrial/storage 
8. Term - 20 years
9. break options to be agreed
10. date of entry to be agreed
96

Page 97

11. Costs - each party responsible for their own legal costs
12. alienation/assignation is permitted only to a similar organisation with similar
objectives subject to landlord consent 
5. Employee Implications
5.1. There are no employee implications. 
6 Financial Implications
6.1. The site is held in the Lanark Common Good account.  The premises, once
constructed and let, will be added of the assets of the Common Good account. 
6.2. If the workshop is vacated, it would be relet on commercial terms, however, the Lanark
Common Good Fund would be liable for any costs associated with any vacant property
until the new lease was in place. As these buildings are being built with the intention
of these being leased out, a financial liability to the Common Good would only arise
should these tenants leave.  Therefore, at this point, there should be no financial
implications for the Common Good. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. Planning consent has been granted for the proposed development.  Statutory
consultation on the change of use for Common Good has also been undertaken. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no Equality Impact
Assessment is required. 
9.2. Consultation under the Community Empowerment (Scotland) Act 2015 has been
undertaken regarding use of Common Good assets. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
6 December 2023 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee - 9 August 2022 Scottish Government
Regeneration Capital Grant Fund Proposal to Create a Rural Development Centre at
Lanark Racecourse. 
List of Background Papers
 None 
97

Page 98

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk
98

Page 99

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Acquisition of Houses at Jacktonhall, Jackton (Section
75 Planning Reference EK/09/0218) and Brackenhill
Farm, Hamilton (Section 75 Planning Reference
HM/10/0052) 
1. Purpose of Report
1.1. The purpose of the report is to:-[purpose]
 seek approval from Housing and Technical Resources Committee to acquire 89
homes across 2 developments, at Jacktonhall, Jackton and Brackenhill Farm,
Hamilton from Barratt Homes, for inclusion in the Council’s housing stock in
fulfilment of the Planning obligations associated with the  development of the
residential sites
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the acquisition of 89 completed affordable homes from Barratt Homes for
a total price, of £17.8m (which includes the cost of land and includes circa
£500k in recoverable VAT payments), to fulfil the Planning obligations
associated with the residential development of the sites, be approved; and
(2) that the Executive Director (Housing and Technical Resources) be given
Delegated Authority to authorise the transactions and instruct Legal Services
to conclude transactions, in the appropriate manner and in the best interests of
the Council, with each individual transaction being in excess of the current
£100k acquisition limit under the existing delegated powers arrangements.
3. Background
3.1. The Local Housing Strategy 2022 to 2027 was approved at Executive Committee on
30 November 2022 and highlights a commitment by the Council and its partners to
actively seek opportunities to develop housing across South Lanarkshire to both meet
housing need and support social and economic regeneration. 
3.2. Also on 30 November 2022, Executive Committee approved a new affordable housing
supply target for the Council, aiming to deliver an additional 1,300 homes by 31 March
2027.  This will be delivered through a combination of new council homes and the
acquisition of existing homes from the market, with the new sites set out within the
Strategic Housing Investment Plan which is updated on an annual basis. 
13
99

Page 100

3.3. On 8 November 2023, the Strategic Housing Investment Programme 2024 to 2029
was approved by Housing and Technical Resources Committee.  This includes
projects with a total potential capacity for delivering up to 2,442 affordable homes in
South Lanarkshire over the 5-year period to March 2029 and included both
Jacktonhall, Jackton (40 units) and Brackenhill Farm, Hamilton (49 units). 
4. Proposal
4.1. In November 2023, the Council entered into discussions with Barratt Homes to fulfil
their planning obligation for new affordable homes through a turnkey arrangement with
the Council paying staged payments for each key stage completed for each house.
The mix of houses across the sites consists of 2, 3 and 4-bedroom homes including
cottage flats, terraced, semi-detached and detached houses.  It is anticipated that
these houses will be complete in 2026. 
4.2. The proposal provided by Barratt Homes has been assessed by the Council’s relevant
technical and commercial services as presenting value for money for the Council. 
4.3. Therefore, it is proposed to acquire 89 completed houses from Barratt Homes, subject
to the following principal conditions:- 
 the Council will pay a land payment (20% of unit value)
 the balance for each unit will then be paid in the following stages – Floor Slab
(25%), Wind and Watertight (35%) and Completion (20%)
 the Council will obtain a standard security over the site until such times as all
houses have been completed
 the Council will receive a third party warranty covering defects and structure for
a period of no less than 10 years.
 each party will be responsible for their own legal fees 
5. Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. Acquisition of the properties will be funded from the Housing Revenue Account,
Capital Programme and will be eligible for Scottish Government Affordable Housing
grant funding which will reduce the overall cost to the Council. 
6.2. The proposed purchase price for each unit type compares favourably with the asking
prices of the same house types within the development and prices of similar new
properties on the open market. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained within the report.  All homes will be built to Housing for
Varying Needs standards and Silver aspect 2 level for energy standards. 
8. Other Implications
8.1. Should the acquisition of the 89 homes from Barratt Homes not progress, there may
be implications to the Council’s ability to meet increasing housing need in Hamilton
and East Kilbride areas, along with its ability to achieve the 1,300 additional council
home target set by Executive Committee on 30 November 2022.   
100

Page 101

9. Equality Impact Assessment and Consultation Arrangements
9.1. All necessary consultations with Housing, Planning, Roads and Legal Services have
taken place and they are supportive of the proposal. 
9.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
14 December 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Good quality, suitable and sustainable places to live 
Previous References
 None 
List of Background Papers
 Local Housing Strategy 2022 to 2027 – Executive Committee, 30 November 2022
 Housing Supply Target – Executive Committee, 30 November 2022
 Strategic Housing Investment Programme 2024 to 2029 – Housing and Technical
Resources  Committee, 8 November 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Derek Craig, Property Manager (Consultancy Services)
Ext: 3517   (Tel: 01698 453517)
E-mail: Derek.Craig@southlanarkshire.gov.uk
101

Page 102

102

Page 103

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Former David Milne Centre, 84 Old Mill Road,
Uddingston – Asset Transfer to Rivals School of
Martial Arts 
1. Purpose of Report 
The purpose of the report is to:-
[purpose]
 advise the Committee of the request for asset transfer, by lease, of the former
David Milne Centre, 84 Old Mill Road, Uddingston to Rivals School of Martial
Arts; and 
 request approval to the principal terms and conditions of asset transfer as set out
in Section 5 of the report
[1purpose]
2. Recommendation(s) 
The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the former David Milne Centre, 84 Old Mill Road, Uddingston be leased to
Rivals School of Martial Arts, subject to the terms and conditions outlined in
Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council 
3. Background
3.1. The Council owns the former David Milne Centre, 84 Mill Road, Uddingston.  The
property closed in March 2023 and is currently vacant. 
3.2.  Rivals School of Martial Arts has been in existence for 16 years and a charity since-
April 2016.   
3.3. Rivals School of Martial Arts submitted a request for Community Asset Transfer of the
former hall, by lease, the validation date for which was 18 September 2023. 
3.4. In addition to placing the application and supporting documentation on the Council’s
Planning Portal, notices were placed on the property advising that the Council was
considering an asset transfer.  The closing date for responses was 19 October 2023
at which time 57 representations were received, 34 in favour of the project and 23
raised objections, primarily with concerns around parking provision and potential
competition with other local organisations/facilities. 
14
103

Page 104

3.5. The request was placed before the Community Asset Transfer Assessment Panel on
12 December 2023 when the following matters were taken into consideration. 
3.6. Property
3.6.1. The property is a single storey building with a main hall, 2 small meetings rooms,
kitchen and toilets.  Car parking is provided via public car parking which does
experience pressure during the day, however, has capacity in the evenings. 
3.6.2. The facility has been closed since South Lanarkshire Leisure and Culture (SLLC)
withdrew services in March 2023 and there are no other operational requirements for
the building. 
3.6.3. The Planning Service has indicated that planning consent will not be required as there
is no change of use. 
3.6.4. The in-house Valuer has placed a rental value of £8,200 per annum on the property. 
3.7. Organisation
3.7.1. The organisation has been in existence for 16 years and was established as a Scottish
Charitable Incorporated Organisation (SCIO), Scottish Charity No. SC046518 in April
2016.   
3.7.2. Legal Services has confirmed the constitution is appropriate for community asset
transfer by lease and the constitution does contain an asset lock. 
3.7.3. The purposes of the organisation are “the promotion of community participation in
healthy sport (and recreation) for the health, benefit and community development by
the provision of premises and facilities for playing and participating in Martial Arts and
associated health promoting activities.”
3.7.4. The organisation has 8 trustees, 8 members of staff and 30 volunteers.  The
organisation currently operates from 3 other facilities across South and North
Lanarkshire. 
3.8. Project
3.8.1. The proposal is to transfer the former hall via a 20-year lease, with a break option at
year 5, at nominal rent.   
3.8.2. There is no major capital investment programme or redevelopment proposed, rather
conversion into a state-of-the-art martial arts training and community centre, involving
interior renovations to create well-equipped training areas, fitness facilities,
classrooms for workshops and social spaces for gathering and relaxation. 
3.8.3. The organisation has assessed the costs of operating the facility based upon its
experience in other locations and the latest accounts and bank statements show that
the organisation is sustainable and has the funds to deliver the works to the property. 
4. Assessment
4.1. Rivals School of Martial Arts has experienced trustees and is successfully operating
similar facilities across Lanarkshire.  The organisation works closely with other third
sector organisations particularly providing support for employability programmes and
working with young people with complex needs. 
104

Page 105

4.2. There are no significant capital works required to the property and therefore, no grant
funding applications are being made at the present time. 
4.3. There is a small risk in terms of viability of the project given the rapid expansion of the
organisation’s activities, however, the inclusion of a break option within the lease goes
towards mitigating this risk. 
4.4. The community benefits derived from the proposal relate to health and wellbeing,
education and development of sport. 
4.5. Within its asset transfer request, Rivals School of Martial Arts requested transfer by
lease at a nominal rental of £1 per annum.  The Community Asset Transfer Working
Group assessed the potential community benefits and recommended that a discount
of 100% be applied.  This equates to £8,200 per annum. 
4.6. On balance, given that the facility is no longer required by SLLC, the organisation is
stable and the project viable, it is recommended that the 20-year lease be granted with
a mutual break option at year 5. 
5. Proposal
5.1. It is proposed to grant a lease of the former David Milne Centre, Uddingston to Rivals
School of Martial Arts, on the following principal terms and conditions:- 
1. the lease will be to Rivals School of Martial Arts 
2. the lease will be for 20 years
3. there will be a mutual break option in year 5 of the lease
4. date of entry to be agreed
5. the rental is £1 per annum, if asked
6. the tenants would be responsible for all repairs and maintenance
7. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5m for any one claim
8. the Council will insure the property and recover the costs from the tenants
9. the use will be for a sports facility and community centre
10. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
11. assignation and subletting (excluding hourly lets) will not be allowed without the
Council's express consent
12. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
6. Employee Implications
6.1. There are no employee implications as the facility is currently closed. 
7. Financial Implications
7.1. The proposed asset transfer removes revenue costs associated with the vacant
property, in excess of £8,500 per annum. 
7.2. The property could generate a capital receipt in the region of £80k if planning consent
could be secured for commercial use. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report.
105

Page 106

9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until
18 March 2024 to provide a notice of its decision whether to agree to or refuse the
asset transfer request. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale or the asset transfer request be refused. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with Community and Enterprise, Planning, Legal and
Finance Services as well as having been published for public consultation. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities. 
Previous References
 None 
List of Background Papers
 Asset Transfer Application Ref CAT/23/0008 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk
106

Page 107

14
107

Page 108

108

Page 109

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Former Hareleeshill Sports Barn, Donaldson Road,
Larkhall – Lease to Rivals School of Martial Arts 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Housing and Technical Resources Committee of the request for a
concessionary lease of Hareleeshill Sports Barn, Donaldson Road, Larkhall to
Rivals School of Martial Arts; and
 seek approval to the principal terms and conditions as set out in Section 5 of the
report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the subjects at Hareleeshill Sports Barn, Donaldson Road, Larkhall, be
leased to Rivals School of Martial Arts, subject to the terms and conditions
outlined in Section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council 
[1recs]
3. Background
3.1. The subjects at Hareleeshill Sports Barn Donaldson Road, Larkhall were, until
recently, managed by South Lanarkshire Leisure and Culture (SLLC). 
3.2.  Following a review of its business plan, the SLLC Board announced that it could not
sustain service delivery from this facility and control was returned to the Council. 
3.3. Rivals School of Martial Arts approached the Council with a request for an annual
lease of the subjects to enable the facility to re-open for community participation in
sports and participating in martial arts and associated health promotion activities.  The
lease will enable them to operate the facility whilst testing the viability of a future
Community Asset Transfer (CAT). 
3.4. At this point, this is not a formal CAT request in terms of the Community Empowerment
(Scotland) Act 2015, however, the application to lease has been assessed following
the established CAT procedure.  The Community Asset Transfer Working Group has
recommended that that the applicants be granted a 100% rent reduction for the annual
lease. 
15
109

Page 110

3.5. Property
3.5.1. The extent of the property is shown on the attached plan and as there is no change of
use or development proposed, planning consent will not be required. 
3.5.2. The facility has been closed since SLLC withdrew services in March 2023 and there
are no other operational requirements for the building. 
3.5.3. The in-house valuer has placed a rental value of £17,100 per annum. 
3.6. Organisation
3.6.1. Rivals School of Martial Arts has been in existence for 16 years and was established
as a Registered Charity Registration No SCO46518 in April 2016. 
3.6.2. The purposes of the organisation are “the promotion of community participation in
healthy sport (and recreation) for the health, benefit and community development by
the provision of premises and facilities for playing and participating in Martial Arts and
associated health promoting activities.” 
3.6.3. Rivals School of Martial Arts works with Active Schools, school partnerships, Routes
to Work, Children with Autism and families from disadvantaged backgrounds.  In
addition, it works with Police Scotland, Scottish Fire and Rescue and other charities
and third sector organisations. 
3.6.4. The organisation has 8 trustees, 8 members of staff and 30 volunteers.  The
organisation currently operates from 3 other facilities across South and North
Lanarkshire. 
3.7. Project
3.7.1. The proposal is to re-open the facility as a sports facility, community hall and offices
then, through its management, develop additional activities which will evidence a
sustainable operating model and support a future CAT application.  The grant of an
annual lease will allow the organisation to assess the viability of the proposal. 
3.7.2. The organisation has several ideas for the use of the facility and is keen to limit the
impact of the hall’s closure on local community groups. 
4. Assessment
4.1. Rivals School of Martial Arts has experienced trustees and is successfully operating
similar facilities across Lanarkshire.  The organisation works closely with other third
sector organisations particularly providing support for employability programmes and
working with young people with complex needs. 
4.2. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.3. The grant of the annual lease will enable the facility to re-open and relieve the Council
of the costs of empty property rates, utility charges, insurance costs and repairs. 
4.4. The risks associated with the proposed lease are considered low, given both the status
of the organisation and that the request is for a year-to-year lease. 
4.5. The Council has no alternative operational requirement for the subjects.  Should the
lease prove unsustainable, the Council will have the ability to resume full ownership
and consider the future of the property, however, a significant capital receipt could
only be generated through a change of designation in the Local Development Plan. 
110

Page 111

5. Proposal
5.1. It is proposed to lease the subjects at Hareleeshill Sports Barn Donaldson Road,
Larkhall to Rivals School of Martial Arts on the following principal terms and
conditions:- 
1. the lease will be to Rivals School of Martial Arts
2. the lease will be for a period of 1 year
3. the date of entry to be agreed
4. the rental shall be £1 per annum, if asked
5. the lease to be fully repairing and insuring.  Neither the tenant nor the landlord
will be responsible for any major repair works that may be required to the
premises
6. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim
7. the Council will insure the property and recover the costs from the tenants
8. the property will be used as a sports facility, community hall and offices
9. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
10. assignation and subletting (excluding hourly lets) will not be allowed without the
Council's express consent
11. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
5.2. At the expiry of the lease, the Council will consider renewal of the lease subject to
being satisfied as to the operation of the subjects by the Trust and evidence of
community benefits. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates, insurance
and utility standing charges and repairs and maintenance, estimated to be £35,000
per annum. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability or the environment
contained within this report. 
9. Other Implications
9.1. None. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024
111

Page 112

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities. 
Previous References
♦ Asset Transfer Application Ref CAT/23/0008 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073 (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
112

Page 113

113

Page 114

114

Page 115

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Former Spittal Community Centre, Carrick Road,
Rutherglen and Former Toll Pitch Community Hall,
Hamilton Road, Cambuslang – Lease to The LEAP
Project 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Housing and Technical Resources Committee of the request for a
concessionary lease of the former Spittal Community Centre, Carrick Road,
Rutherglen and former Toll Pitch Community Hall, Hamilton Road, Cambuslang to
The LEAP Project; and
 seek approval to the principal terms and conditions as set out in Section 5 of the
report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the former Spittal Community Centre, Carrick Road, Rutherglen, be leased
subject to the terms and conditions outlined in Section 5.1 of the report
(2) that the former Toll Pitch Community Hall, Hamilton Road, Cambuslang be
leased subject to the terms and conditions outlined in Section 5.2 of the report;
and
(3) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the leases and enter into the necessary legal agreements
on terms which are in the best interests of the Council 
3. Background
3.1. The subjects at Spittal Community Centre, Carrick Road, Rutherglen and Toll Pitch
Community Hall, Hamilton Road, Cambuslang were, until March 2023, managed by
South Lanarkshire Leisure and Culture (SLLC). 
3.2.  Following a review of its business plan, the SLLC Board announced that it could not
sustain service delivery from this facility and control was returned to the Council. 
3.3. The LEAP Project approached the Council with a request for an annual lease of these
subjects to enable the facilities to re-open for community use as quickly as possible. 
The leases will enable them to operate the facilities whilst testing the viability of a
future Community Asset Transfer (CAT). 
16
115

Page 116

3.4. At this point, this is not a formal CAT request in terms of the Community Empowerment
(Scotland) Act 2015, however, the application to lease has been assessed following
the established CAT procedure.  The Community Asset Transfer Working Group has
recommended that that the applicants be granted a 100% rent reduction for the annual
leases and it is anticipated that a formal CAT application will be developed. 
3.5. Property
3.5.1. The extent of the properties is shown on the attached plans and as there is no change
of use or development proposed, planning consent will not be required in either case. 
3.5.2. The in-house valuer has estimated that the rental values associated with the properties
are circa £9,900 per annum and £4,500 per annum respectively. 
3.6. Organisation
3.6.1. The LEAP Project is a Scottish Charitable Incorporated Organisation (SCIO) Company
Registration No SCIO 024196.  LEAP, as an organisation, has been operating since
1992 and manages several properties in the area.  The organisation is stable and has
considerable funds and income streams. 
3.6.2. The purpose of the organisation is to provide facilities for educational, health and
recreational activities and resources to the residents of Cambuslang.
3.7. Project
3.7.1. The proposal is for The LEAP Project to re-open the facilities as community halls and
offices then, through their management, develop additional activity which will evidence
a sustainable operating model and support a future CAT application.  The grant of an
annual lease will allow the organisation to assess the viability of the proposals and
develop proposals for future, longer term lease agreements or purchase. 
3.7.2. The organisation has several ideas for the use of the facility and is keen to limit the
impact of the hall’s closure on local community groups. 
4. Assessment
4.1. The properties are suitable for the proposed use and the organisation has the capacity
and funds to manage them. 
4.2. The grant of the annual leases will enable the facilities to re-open and relieve the
Council of the costs of empty property rates, utility charges, insurance costs and
repairs. 
4.3. The risks associated with the proposed leases are considered low given both the
status of the organisation and that the request is for year-to-year lease arrangements. 
4.4. The Council has no alternative operational requirement for either of the subjects. 
Should the lease prove unsustainable for The LEAP Project, the Council will have the
ability to resume full ownership and consider the future of the properties, however, it
is anticipated that a formal application for CAT will be forthcoming. 
5. Proposal
5.1. It is proposed to lease the subjects at Spittal Community Centre, Carrick Road,
Rutherglen to The LEAP Project on the following principal terms and conditions:- 
1. the lease will be to The LEAP Project
2. the lease will be for a period of 1 year
3. the date of entry to be agreed
4. the rental shall be £1 per annum, if asked
116

Page 117

5. the lease to be fully repairing and insuring.  Neither tenant nor the landlord will
be responsible for any major repair works that may be required to the premises
6. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim
7. the Council will insure the property and recover the costs from the tenants
8. the property will be used as a community hall and offices
9. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
10. assignation and subletting (excluding hourly lets) will not be allowed without the
Council's express consent
11. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
5.2. It is proposed to lease the subjects at Toll Pitch Community Hall, Hamilton Road,
Cambuslang to The LEAP Project on the following principal terms and conditions:- 
1. the lease will be to The LEAP Project
2. the lease will be for a period of 1 year
3. the date of entry to be agreed
4. the rental shall be £1 per annum, if asked
5. the lease to be fully repairing and insuring.  Neither tenant nor the landlord will
be responsible for any major repair works that may be required to the premises
6. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim
7. the Council will insure the property and recover the costs from the tenants
8. the property will be used as a community hall and offices
9. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
10. assignation and subletting (excluding hourly lets) will not be allowed without the
Council's express consent
11. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
5.3. At the expiry of the leases, the Council will consider renewal of the leases subject to
being satisfied as to the operation of the subjects by the tenants and the demonstration
of community benefits. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates, insurance
and utility standing charges and repairs and maintenance. 
7.2. The properties remain in Council ownership and therefore, a future capital receipt
remains an option. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. None. 
117

Page 118

10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Joanne Forbes, Head of Property Services
Ext: 4073 (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
118

Page 119

119

Page 120

120

Page 121

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resource Plan: Quarter 2
Progress Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide the Housing and Technical Resource Plan Quarter 2 Progress Report
2023/2024, for the period 2 April to 30 September 2023 
2. Recommendations
2.1. The Committee is asked to note the following recommendation(s):- 
(1) that the Housing and Technical Resource Plan Quarter 2 Progress Report
2023/2024, as summarised in paragraph 5.2 and attached as Appendix 2 of
this report, be noted
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3 of this report, be noted; and 
(3) that the areas for improvement and associated management actions, as
detailed in paragraph 5.4 of this report, be noted 
3. Background
3.1. The Housing and Technical Resource Plan 2023/2024 was approved by Committee
on 31 May 2023 and sets out the outcomes, measures and actions to be managed
and delivered by the Resource for the financial year 2023/2024.   
3.2. The Resource Plan follows the agreed corporate structure and style.  The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2023/2024
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2023/2024.  These are detailed at Appendix 1. 
5. Quarter 2 Progress Report 2023/2024
5.1. Progress against all Resource Plan measures is contained in the Quarter 2 Progress
Report 2023/2024, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe and uses a traffic
light format with the following definitions to give a status report on each measure:
17
121

Page 122

Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4 of this
report.  To ensure adequate scrutiny of performance across all Resources, the
Council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or
‘amber’ measures at a future meeting. 
The overall summary of progress to date is set out in the table below.  There remains
a legacy impact of Covid-19 and the response to it in some areas and performance
should be considered in that context. 
Status Measures
Statistical  Project  Total %
Blue 0 3 3      3%
Green  25 45 70     77%
Amber  4 1 5    5%
Red     0 0 0     0%
Report later/Contextual 6 8 14     15%
Totals  35 57 92 100%    
(Data correct as at 14 December 2023) 
5.3. Key achievements for 2023/2024, to date, are noted below. 
5.3.1. 
Connect Outcome:  Health and Wellbeing 
Resource Outcome Achievement
Support people to
live active and
independent lives
All of the 58 new homes completed to date within
2023/2024 have been built to ‘Housing for Varying Needs’
standards and are easily adaptable to accommodate
tenant’s changing needs over time.  24% (14) of the new
homes have been built suitable for those who use
wheelchairs or with mobility difficulties, with fully
accessible wet rooms and step free access. 
The Council’s affordable housing supply programme
continues to increase the supply of council homes across
South Lanarkshire, with a focus on ensuring that the new
homes provide for changes in peoples need over the
course of time.
Approval of applications for adaptations were, on average,
completed in 24 days against a target of 28 days. 
122

Page 123

Connect Outcome:  Children and Young People
Resource Outcome Achievement
Improve the health and
wellbeing of children,
young people and
families
100% of care leavers were  offered a housing options
discussion. All care experienced young people on the
housing register were provided with housing options
advice  which resulted in the  creation of personal
housing pathway. By the end of Quarter 2, 24 care
experienced young people had been  permanently
housed in the year. 
Connect Outcome:  Housing and Land
Resource Outcome Achievement
Continue to deliver an
affordable housing
programme to meet
needs
Continued to increase the supply of affordable housing
with the delivery of 108 additional new houses provided
2023/2024 YTD.  This includes 58 new build properties
and 50 properties have been acquired through the
market purchase scheme.
Support people to
access and sustain
housing which meets
their needs through our
Integrated Housing
Option Service
Ensuring those with the highest housing need are
prioritised with 67.40% of lets to Urgent Housing (UH)
need households. 
93.10% of tenancies sustained for more than a year.
Ensure our repairs
service continues to
meet the needs of
customers
99% of reactive repairs were completed right first time. 
Emergency repairs were, on average, completed in 7
hours 30 minutes against a target of 24 hours.
Provide a
comprehensive range
of services to help
prevent and alleviate
homelessness
including the provision
of suitable and
temporary and
supported
accommodation
The continuing surge in demand for homelessness
services and reduced  access to other options ,
particularly  within the private rented sector (which is
occurring nationally and locally) is acting against
achievement of the key strategic target of reducing
homelessness. 
However, temporary accommodation was provided to all
homelessness households where it was required. 
5.3.2. In addition to working towards these Outcomes, we recognise that the Council will
continually aim to improve and ensure effective and efficient use of resources and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and Achieving Best Value
Resource Outcome Achievement
The Council
demonstrates high
standards of
governance and
sound financial
stewardship
Stage 1 complaints were fully responded to within an
average of 4 working days, against a target timescale of 5
working days (SSHC).
Stage 2 complaints were fully responded to within an
average of 15 working days, against a target timescale of
20 working days (SSHC).
123

Page 124

Delivering the Plan and Achieving Best Value
Resource Outcome Achievement
Against an extremely challenging set of socio-economic
circumstances, positive performance, against previous
year, was achieved in relation to:-
• the percentage of rent collected increased from 96.9% in
quarter 1 to 98.9% quarter 2
• the percentage of gross rent arrears (current and former)
reduced over the same period from 8.84% in quarter 1 to
8.27% in quarter 2 
5.4. Areas for Improvement
There were no measures that have been classified as ‘red’ (major slippage against
timescale or shortfall against target). 
5.5.  Report Later
Measures in the quarterly progress reports which are not red, amber or green can be
assigned a status of ‘report later’ or ‘contextual’.  The updated status and
explanatory narrative relating to the remaining one ‘report later’ measure from the
previous Resource Plan 2022/2023 Quarter 4 update to Committee is detailed in
Appendix 3. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and longer term, within the framework of the
council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2023/2024. 
9.  Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register.
.
10. Equality Impact Assessment and Consultation Arrangements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
124

Page 125

Stephen Gibson
Executive Director (Housing and Technical Resources) 
5 January 2024 
Link(s) to Council Values/Priorities
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Housing and Technical Resources Quarter 1 Progress Report 2021/2022: No Quarter 1
report produced in 2022/2023 due to approval of the new Council Plan 2022-27 
List of Background Papers
 Council Plan Connect 2022 to 2027 – Council, 15 June 2022
 Housing and Technical Resource Plan 2023/2024 – Housing and Technical Resources
Committee, 31 May 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lynn Hayes (Performance and Support Advisor)
Ext:  4823 (Tel:  01698 454823)
E-mail:  lynn.hayes@southlanarkshire.gov.uk
125

Page 126

Appendix 1 
Housing and Technical Resource Outcomes 2023/2024 
Connect Outcomes Resource Outcomes
Communities and
Environment
• Work with communities to create safe, strong sustainable places
• Increased ownership of local assets 
Education and Learning • No Resource outcomes for this Connect outcome.
Health and Wellbeing • Support people to live active and independent lives
• Help people to continue to live within their homes and
communities through integrated community health and social
care services
Children and Young
People
• Improve the health and wellbeing of children, young people and
families
Housing and Land • Support people to access and sustain housing which meets
their needs through our Integrated Housing Options service
• Provide a comprehensive range of services to help prevent and
alleviate homelessness including the provision of suitable
temporary and supported accommodation
• Continue to deliver an affordable housing programme to meet
needs
• Manage the council’s portfolio of properties and land
• Ensure our repairs service continues to meet the needs of
customers
• More energy efficient council homes
• Continue to engage and work with tenants and other customers
to design our services
• Provide high quality services to our service to our tenants,
including those who live in sheltered housing and residents at
our Gypsy / Travellers sites
• Improved outcomes for households experiencing
homelessness, including access to settled accommodation
• Work to bring empty homes back into use to help meet needs
within South Lanarkshire
• Continue to develop a range of properties to meet the council
needs
• Deliver a first-class repairs and maintenance service
• Work with property owners and landlords to make sure our
private housing is suitable for the needs of our residents
Our Economy • Help create town centres that offer a social, cultural and
economic heart to a community and contain shared built
environment, heritage and spaces that, with the right conditions,
provides inclusive and sustainable centres 
Delivering the Plan and
achieving Best Value
Resource Outcomes
• Digital and ICT services meet the needs of its customer 
• Customers experience high quality and improving council
services
• The council demonstrates high standards of governance
and sound financial stewardship
• The workforce has the skills, flexibility and capacity to
deliver the council’s outcomes 
126

Page 127

17
127

Page 128

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 8 Jan 10:03
Summary - number of measures green, amber and red under each Council Plan Outcome / Theme
Council Outcome/ Theme  Green Amber Red Report later /
Contextual
Total
Communities and Environment  0 1 0 0 1
Education and Learning  0 0 0 0 0
Health and Wellbeing  5 0 0 1 6
Children and Young People  0 0 0 0 0
Housing and Land  14 2 0 3 19
Our Economy  0 0 0 0 0
Delivering the plan and achieving best value  6 1 0 2 9 
Total 25 4 0 6 35
128

Page 129

IMPROVe - SLC Performance Management System          Report printed on 8 Jan 10:03
129

Page 130

Resource Plan Performance Indicators South Lanarkshire Council - Housing and Technical
IMPROVe - SLC Performance Management System        Report printed on Monday 8 January 2024
Communities and Environment
Work with communities to create safe, strong sustainable places
Performance Indicators Comments/ Progress ----------- This Year -----------
Status Target To Date
-------- Last 3 Years --------
2020/21 2021/22 2022/23
% of Anti-Social Behaviour cases resolved in
the year (SSHC) (RP)
Performance currently slightly below target but is anticipated to improve
as the year progresses.
Amber 90.00% 86.50% 95.21% 94.30% 96.80%
Health and Wellbeing
Support people to live active and independent lives
----------- This Year ----------- -------- Last 3 Years --------
Performance Indicators Comments/ Progress Status Target To Date 2020/21 2021/22 2022/23
No. of adaptations completed in Council
homes
518 adaptations completed in Council Homes. Contextual ------ 518 476 993 1,266
No of households currently waiting for
adaptations to their home
Target achieved. Green 0 0 0 0 0
% of approved applications for adaptations
completed in year (SSHC)
All adaptations were approved, this measure is demand led. Green 100.00% 100.00% 100.00% 100.00% 100.00%
Average time (working days) to complete
applications (SSHC)
Target achieved. Green 28.00
days
24.00
days
28.00 days 23.49 days 21.72 days
% of standard adaptations to council houses
within agreed appointment times
Target achieved. Green 90.0% 90.9% 92.4% 98.3% 90.1%
% of new build that are wheelchair
accessible (RP)
The council!s affordable housing supply programme continues to increase
the supply of council homes across South Lanarkshire, with focus on
ensuring that new homes provide for peoples changing needs over the
course of time.
All of the 58 new homes completed to date within 2023/24, all have been
built to "Housing for Varying Needs! standards and are easily adaptable
to accommodate tenant!s changing needs over time. 24% (14 units) of
the new homes have been built suitable for those who use wheelchairs
or with mobility difficulties, with fully accessible wet rooms and step free
access.
Green 10.0% 24.0% ------ ------ ------
130

Page 131

Resource Plan Performance Indicators South Lanarkshire Council - Housing and Technical
-------- Last 3 Years --------
To Date 2020/21 2021/22 2022/23
IMPROVe - SLC Performance Management System        Report printed on Monday 8 January 2024
Housing and Land
Support people to access and sustain housing which meets their needs through our Integrated Housing Options service
----------- This Year -----------
Performance Indicators Comments/ Progress Status Target
% of lets to Urgent housing (UH) need
households (RP)
Target achieved. Green 55.0% 67.4% 61.1% 53.5% 58.1%
% of new tenancies sustained for more
than a year for all lets (SSHC) (RP)
Tenancy sustainment has remained strong in the period of the year and
above target.
Green 88.00% 93.10% 91.90% 93.40% 92.00%
% of tenancy offers refused during the year
(SSHC) (RP)
Refusals are driven by the applicant and can vary significantly depending
on size/availability/location of housing.
Contextual ------ 17.6% 24.7% 16.6% 23.4%
Average time taken to relet empty properties
(SSHC) (RP)
At quarter 2 there has been an improvement on previous year!s
performance. Performance continues to be monitored and a number of
improvement actions identified.
Green 30.00
days
25.83
days
21.00 days 21.50 days 27.76 days
Provide a comprehensive range of services to help prevent and alleviate homelessness including the provision of sustainable temporary and supported accommodation
----------- This Year ----------- -------- Last 3 Years --------
Performance Indicators Comments/ Progress Status Target To Date 2020/21 2021/22 2022/23
Average length of time in temporary
accommodation (RP)
Target achieved. Green 120 days 78 days 121 days 105 days 96 days
% of households provided with temporary
accommodation (SG) (RP)
Target achieved. Green 100.0% 100.0% 100.0% 100.0% 100.0%
% of temporary accommodation on offers
refused (RP)
Target achieved. Green 6.00% 6.00% 6.84% 7.42% 6.00%
Number of times we did not meet our
obligation to provide suitable
accommodation (SG) (RP)
Target achieved. Green 0 0 0 0 0
% of homeless households advised of
outcome of assessment within 28 days (RP)
This is a locally set target and is a key focus for the Resource and continues
to be closely monitored by management.
Green 95.0% 96.2% 99.8% 99.6% 95.2%
131

Page 132

Resource Plan Performance Indicators South Lanarkshire Council - Housing and Technical
-------- Last 3 Years --------
To Date 2020/21 2021/22 2022/23
IMPROVe - SLC Performance Management System        Report printed on Monday 8 January 2024
Housing and Land
Improved outcomes for households experiencing homelessness, including access to settled accommodation
----------- This Year ----------- -------- Last 3 Years --------
Performance Indicators Comments/ Progress Status Target To Date 2020/21 2021/22 2022/23
Improved outcomes for households experiencing homelessness, including access to settled accommodation
----------- This Year -----------
Performance Indicators Comments/ Progress Status Target
% of Housing Options interventions where
Homelessness prevented (RP)
During 2023/24, 271 (64.5%) homeless cases have been prevented. The
operating context in relation to the prevention of homelessness
continues to be extremely challenging this year. The prevailing socio-
economic conditions adversely impacted upon the ability to prevent
homelessness during 2023/24. This trend has been mirrored nationally.
Amber 70.0% 64.5% ------ 73.5% 65.9%
Ensure our repairs service continues to meet the needs of customers
----------- This Year ----------- -------- Last 3 Years --------
Performance Indicators Comments/ Progress Status Target To Date 2020/21 2021/22 2022/23
% of response repairs completed on time Target achieved. Green 90.0% 96.6% 97.7% 99.1% 95.3%
% of tenant satisfaction with repairs or
maintenance in year (SSHC)
Target achieved. Green 90.0% 91.0% 90.0% 91.0% 89.0%
132

Page 133

Resource Plan Performance Indicators South Lanarkshire Council - Housing and Technical
-------- Last 3 Years --------
To Date 2020/21 2021/22 2022/23
IMPROVe - SLC Performance Management System        Report printed on Monday 8 January 2024
Housing and Land
Ave length of time to complete emergency
repair - hours (SSHC) - YTD
Target achieved. Green 24.00
hours
7.30
hours
3.26 hours 4.24 hours 5.36 hours
Ave length of time to complete non
emergency repair (SSHC) (LGBF) - YTD
Target achieved, non emergency repairs were suspended from 26 June to
18 September 2023 and the average days to complete exclude this
duration until the re-instated date.
Green 28.00
days
14.94
days
13.07 days 11.76 days 11.63 days
% of reactive repairs completed first time
right (SSHC)
Target achieved. Green 90.00% 99.00% 99.95% 99.00% 99.60%
% of repairs appointments kept Target achieved. Green 90.00% 88.90% 94.18% 94.00% 94.00%
No of times we did not, meet our obligation
to complete the annual gas safety check by
annual anniversary date
23 services beyond target date, all now complete. Amber 0 23 411 1 20
Deliver a first-class repairs and maintenance service
----------- This Year ----------- -------- Last 3 Years --------
Performance Indicators Comments/ Progress Status Target To Date 2020/21 2021/22 2022/23
More energy efficient council homes
----------- This Year -----------
Performance Indicators Comments/ Progress Status Target
% of Council stock meeting the SHQS To be reported at year end. Report Later ------ ------ 93.5% 72.3% 80.0%
% of council dwellings that are Energy
Efficiency Standard for Social Housing 2
(EESSH2)
The 2025 and 2032 EESSH Milestones have been suspended as the
Scottish Government are reviewing the EESSH2 standards to strengthen
and realign the standard with the target for net zero heat in houses from
2045.
Report Later ------ ------ 93.88% 98.64% ------
Delivering the plan and achieving best value
Delivering the plan and achieving best value
----------- This Year ----------- -------- Last 3 Years --------
Performance Indicators Comments/ Progress Status Target To Date 2020/21 2021/22 2022/23
133

Page 134

Resource Plan Performance Indicators South Lanarkshire Council - Housing and Technical
-------- Last 3 Years --------
To Date 2020/21 2021/22 2022/23
IMPROVe - SLC Performance Management System        Report printed on Monday 8 January 2024
Housing and Land
% of Stage 1 complaints responded to in full
(SSHC)
70 out of 73 stage 1 complaints responded to in full.  Complaints
continue to be a focus for management and are routinely monitored.
Contextual ------ 96.00% 93.00% 91.00% 95.00%
Average time in working days for a full
response at Stage 1
Target achieved. Green 5 4 5 5 5
% of Stage 2 complaints responded to in full
(SSHC)
9 out of 9 stage 2 complaints responded to in full. Complaints continue
to be a focus for management and are routinely monitored.
Contextual ------ 100.00% 91.00% 100.00% 88.00%
Average time in working days for a full
response at Stage 2
Target achieved. Green 20 15 14 15 15
Rent collected as a % of rent due in the year
(SSHC) (RP)
Performance is very slightly below target and based on the current position,
it is anticipated that the year-end target will be achieved.
Green 99.3% 98.9% 97.4% 98.3% 99.1%
Gross rent arrears (current and former
tenants) as a % of rent due for the year
(LGBF) (SSHC) (RP)
Target achieved. Green 9.01% 8.27% 8.26% 8.91% 8.66%
% of rent due in the year that was lost due
to voids (Operational void rent loss)
(SSHC)
Performance has reduced on previous year!s performance and continues
to be routinely monitored with a number of improvement actions
identified.
Green 0.62% 0.63% 0.42% 0.60% 0.62%
% of total void rent loss (SSHC) Rent lost is currently above target.  Performance continues to be
routinely monitored with a number of improvement actions identified.
Amber 1.42% 1.78% 1.22% 1.53% 1.41%
Factoring collection rate The collection target is 75% by year end.  It is a progressive target and the
collection rate will increase each quarter.   At the end of quarter 2 its
anticipated we will achieve the target by year end.
Green 75.00% 50.10% 74.06% 73.00% 72.20%
134

Page 135

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 0 6 0 0 0 6
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 1 0 0 0 1
Children and Young People 0 7 0 0 0 7
Housing and Land 3 28 1 0 8 40
Our Economy 0 1 0 0 0 1
Delivering the plan and achieving best value 0 2 0 0 0 2
Total 3 45 1 0 8 57
135

Page 136

136

Page 137

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Communities and Environment
Work with communities to create safe, strong sustainable places
Action Measures Comments/ Progress Status
Community Safety
priorities are achieved
Implement the recommended next steps of the review of the
Safer South Lanarkshire Board and associated structure,
ensuring that reporting requirements around police and fire
scrutiny, anti-social behaviour and community justice are
appropriate
The SSLB review completed in March 2023, confirming that the Board
would focus on its statutory scrutiny functions in June 2023 scrutiny
training needs were scoped and approved with training delivery
scheduled for later in the year.
Green
A project to upgrade the public space cameras and install
new cameras at identified hotspots not currently covered by
CCTV is due to complete during 2023/24. These measures
will allow the council to provide a significantly more effective
support function to the police and increase public safety
Funding has been granted from the UK Shared Prosperity Fund and
phase 1 of the works was completed in 2022/23. For the second stage
of the works, the Design Consultant has been appointed and has
provided a comprehensive report.
Preparation of tender documents commenced September 2023 with the
intention of completing this phase by end of March 2024.
Green
Contribute to the Environmental Task Force to address
graffiti, vandalism and fly tipping (RP)
Action plan developed in conjunction with Litter Strategy Group - with
all actions either completed or progressing in line with target
timescales.
Report to the Climate Change and Sustainability Committee provided
on 20 September 2023.
Green
Review the Anti-Social Behaviour Strategy (RP) The review of the Anti-Social Behaviour Strategy is being completed
with partners across the Anti-Social Behaviour Implementation Group
and the Safer South Lanarkshire Steering Group.  The consultative draft
is being finalised for publication and the consultation period will begin
in November before the strategy is submitted to Executive Committee
for approval in March 2024.
Green
Review of rural action
plans to improve
sustainability
Rural action plans will be reviewed with rural communities
every two years
Rural action plans for towns across Clydesdale currently being reviewed
with local tenant representatives and community groups consulted on
the content.
Green
137

Page 138

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Communities and Environment
Increased ownership of local assets
Action Measures Comments/ Progress Status
Support sustainable
community asset
transfer
Further promote the community asset transfer process and
support communities to develop sustained applications
target 3
CAT Officer continues to support growing number of enquiries regarding
Community Asset Transfers and is supporting over 50 groups with the
process.  During this period one application has been approved and a
further application is currently under consideration.
Green
Health and Wellbeing
Help people to continue to live within their homes and communities through integrated community health and social care services
Action Measures Comments/ Progress Status
Ensure effective
contribution to health
and social care outcomes
contained within the
Strategic Commissioning
Plan
In line with Homelessness related Directions within the
Strategic Commissioning Plan 2022-25 pilot routine enquiry
within identified front line homelessness services and develop
plan to support full roll out across health and care services (RP)
Health Improvement passed a report to HSCP managements teams over
the summer including proposals to refresh the Lanarkshire Health and
Homelessness Action Plan and membership.  Ongoing discussion with all
partners via Homeless Strategy Group and continued local positive
approaches, however keen to progress more formal/reportable
arrangements through strategic approach.
Green
Children and Young People
Improve the health and wellbeing of children, young people and families
Action Measures Comments/ Progress Status
Contribute to effective
joint working to
protect
100% of households identified as at risk are referred to
appropriate statutory agencies (RP)
Process in place and staff fully briefed with process. Green
138

Page 139

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Children and Young People
Improve the health and wellbeing of children, young people and families
Action Measures Comments/ Progress
and promote the
wellbeing of children,
young people and adults
Reducing the housing costs for families including energy costs
during 2023/24 - a key action as detailed in the Local Child
Poverty Action Report (RP)
The council published a revised ECO Statement of Intent confirming it is
now participating in the Great British Insulation Scheme alongside the
ECO4 Scheme on 2 September 2023.  Both schemes are open and
receiving applications for eligible households across South Lanarkshire,
allowing national funding to be accessed to support homeowners to
improve the energy efficiency of their homes.
In addition, the council continues to deliver its Housing Investment
Programme to improve the energy efficiency of its properties and reduce
energy costs for tenants.
Green
Investment to increase new affordable housing supply during
2023/24 - a key action as detailed in the Local Child Poverty
Action Report (RP)
The council continues to make positive progress within its Affordable
Housing Supply Programme, with 58 new build properties and 50
additional homes acquired through its Market Purchase Scheme during
2023/24 to date.
Green
Preventing and reducing homelessness for households,
including families with children and young people during
2023/24 - a key action as detailed in the Local Child Poverty
Action Report (RP)
The continuing surge in demand for homelessness services which is
occurring nationally and locally is acting against achievement of the key
strategic target of reducing homelessness. The Resource continues with a
range of measures to address and prevent homelessness including
(Promise and Pathway Plan) and Tenancy Sustainment Fund. 49 out of
128 awards from the Tenancy Sustainment Fund were made to families
with children.
Green
139

Page 140

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Continue to deliver the SHORE standards (Sustainable Housing
on Release for Everyone) standards, by providing appropriate
support to 80% of individuals leaving prison with identified
housing need (RP)
The SHORE Standards are fully implemented with the role expanded to
include admissions as well as representation at the women's unit in
Glasgow.  Funding has been provided from ADP for an additional
SHORE Officer for 3 years.
Green
100% of young people moving on from care offered housing
options appointment, and of those requiring Housing Service
assistance, 100% supported to move onto suitable and
sustainable housing via a personal housing pathway plan (RP)
Pathway plans now well established, 100% of young care leavers offered
housing options discussion progressing to housing plan.
Housing providing surgeries at Promise HUB.
Green
140

Page 141

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Children and Young People
Work with property owners and landlords to make sure our private housing is suitable for the needs of our residents
Action Measures Comments/ Progress
Provide support and
assistance to owner
occupiers and landlords
helping them to meet
their responsibilities of
maintain and repair to
their homes
Conduct review of Scheme of Assistance Policy during 2023/24
(RP)
Review has been rescheduled to 2024/25 to take account of Scottish
Government guidance on all Tenure Housing condition standards and
housing varying needs.
Green
Housing and Land
Support people to access and sustain housing which meets their needs through our Integrated Housing Option Service
Action Measures Comments/ Progress Status
Understand the financial
security of our
customers
Provide a programme of support to our customers including
The offer of tailored support to 100% of tenants who go on to
receive Universal Credit (RP)
Continue to make  personal contact with all tenants who claim Universal
Credit providing person centred advice and support which includes
referrals, signposting to other Council Services and partners.
Green
Provide a programme of support to our customers including
Tenancy Sustainment Fund to support tenant experiencing
financial difficulties sustain their tenancy (RP)
Officer continue to take a person centred approach to managing rent
arrears and supporting tenants in financial difficulties. The Tenancy
Sustainment Fund is a vital tool to assist tenants in arrears to maintain
their rent payments and sustain their tenancy with 128 awards been made
to households within the period.
Green
141

Page 142

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Housing and Land
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
As part of rent setting process complete analysis of the
affordability of our rents by December 2023 (RP)
As part of arrangements for the annual rent consultation for 2024/25, the
Housemark rent affordability tool has been used to carry out a
comparison of South Lanarkshire Council rent levels with other Local
Authority and RSL landlords.  This has shown that South Lanarkshire
Council continues to benchmark as one of the most affordable landlords
in Scotland.
This information will be shared with tenants during the rent setting
consultation process.
Green
Support people to access and sustain housing which meets their needs through our Integrated Housing Option Service
Action Measures Comments/ Progress
Consult with tenants regarding proposed rent levels by
December 2023
Detailed proposals have been developed for the consultation on the
2024/25 rent levels.  The proposed arrangements have been discussed
and agreed with the Budget Scrutiny Group and will be progressed
between the end of October and December 2023.
Green
Development and
implement Local
Housing Strategy for
2022-2027
Annual review completed and approved by Executive
Committee in November 2023 (RP)
Progress has been reviewed by Local Housing Strategy monitoring group
on an ongoing basis. First review to take place in Spring 2024.
Green
Continue to deliver an affordable housing programme to meet needs
Action Measures Comments/ Progress Status
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP and
reported to Housing and Technical Resources Committee (RP)
108 additional new houses provided YTD 2023/24. Includes 58 new
build properties and 50 properties have been acquired through the
Market Purchase Scheme.
Green
Manage the council's portfolio of properties and land
Action Measures Comments/ Progress Status
142

Page 143

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Housing and Land
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Project Management of
General Services
Projects
The General Services Programme spend will be achieved for the
financial year
Spend to Period 6 #17.897m.  Revised 2023/24 Budget #80.357m. Green
Clyde Terrace, Bothwell Nursey commencing with completion
due in 2023
Has been delayed by utilities and now due to complete November 2023. Green
New Jackton Primary School is due for completion in 2023 School opened August 2023. Green
Review of operational
assets and reduction in
the number of properties
Continue to engage with all Council Resources and public sector
partners during 2023/24 to ensure continued progress towards
establishing a core estate through property rationalisation and
investment
To be reported at year end. Report Later
A review of operational assets in each area will identify
opportinuties to rationalise, reuse and redevelop to create
sustainable property portfolio
To be reported at year end. Report Later
Manage the council's portfolio of properties and land
Action Measures Comments/ Progress
Review of office
accommodation in light
of changing working
patterns
Develop and implement a new 5 year office strategy and action
plan
Pursuing imminent settlement of Montrose House and assessing office
space requirements as part of both Hamilton and East Kilbride Town Centre
Masterplan.
Green
Condition is assessed as the percentage of floor space of
operational buildings which are in satisfactory condition
To be reported at year end. Report Later
Suitability is assessed as the percentage of operational buildings
which are considered to be suitable for service delivery
To be reported at year end. Report Later
Progress towards
decarbonisation on the
non housing estate
The council will develop a programme for redusing emissions
within its non-domestic building stock, aiming for heat to be
delivered by zero carbon technology by the 2028 backstop
In progress.  Feedback from Net Zero feasibility studies being used to
develop priorities for an emissions reduction programme to transition
fossil fuel heating systems to zero carbon technology by 2038 backstop. 
A review of assets is underway to establish the $core estate% before
finalising any investment strategy.
Green
143

Page 144

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Housing and Land
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Complete feasibility studies to identify and cost the energy
measures and heating system replacement works that will be
required to decarbonise heat by 2038 across the council's wet
leisure and primary school estate
On target.  Individual feasibilities received for both primary schools and Wet
Leisure sites. Final report being prepared to scale up findings.
Green
Achieve energy efficiency and carbon emissions reductions
through delivery of the CEEF programme
On Target.  Report was submitted to CMT on 21 September and the
programme of works was approved.  The addition of the budget to the
Capital Programme will need to be approved by Executive Committee
before projects can be initiated.
Green
More energy efficient council homes
Action Measures Comments/ Progress Status
Improve energy efficiency
stock to help address fuel
poverty
Deliver Housing Investment Programmes to ensure as many
socially rented properties as practically possible achieve the
Energy Efficiency Standard for Social Housing (EESSH2) by 2032
The 2025 and 2032 EESSH Milestones have been suspended as the Scottish
Government are reviewing the EESSH2 standards to strengthen and realign
the standard with the target for net zero heat in houses from 2045.
Report Later
Maximise the energy efficiency of homes to help with household
bills and build towards net zero
To be reported at year end. Report Later
More energy efficient council homes
Action Measures Comments/ Progress
Develop and implement South Lanarkshire Local Heat and
Energy Efficiency Strategy (LHEES) and associated Delivery Plan
Development of LHEES underway with external consultant appointed to
support with reporting to Committee in April 2024.
Green
To contribute to national fuel poverty targets, the council will
undertake a review to identify the proportion of households
within its housing stock that are in, or are susceptible to being
in, fuel poverty
Review of properties underway to determine how best Housing
Investment Programme can tackle fuel poverty, targeting those most in
need.
Green
Develop feasibility studies for proposed district heating systems
at the multi storey blocks in East Kilbride and Hamilton
Feasibility studies completed for both. Complete
144

Page 145

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Housing and Land
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Improve homes and the housing environment for residents by
continuing to invest in fabric upgrade
To be reported at year end. Report Later
Continue to engage and work with tenants and other customers to design our services
Action Measures Comments/ Progress Status
Ensure effective
involvement with tenants
and other customer
groups
Annual Scrutiny Programme 2023/24 developed August 2023
and implemented by March 2024 (RP)
The Scrutiny Programme has been signed off with customer
representatives and the identified scrutiny activities will now be delivered
by the end of this year.
Green
Customer Engagement Programme agreed with tenant
representatives by August 2023 (RP)
The annual programme for customer engagement was agreed with the
Tenant Participation Coordination Group on August 2023 and includes:
The provision of regular information on the Strategic Housing
Investment Plan, Local Housing Strategy, and Scottish Social Housing
Charter.
Involvement in the revised Customer Involvement Strategy and revised Anti-
Social Behaviour Strategy.
Complete
Continue to engage and work with tenants and other customers to design our services
Action Measures Comments/ Progress
Service Development is
informed by
understanding our
customer satisfaction
levels of key service
areas
Customer satisfaction programme developed and approved by
July 2023 (RP)
The 2023/24 customer satisfaction survey programme was approved at
RMT on 13 July 2023.
Green
Results are reviewed quarterly, and any improvement activities
are identified and incorporated into services and resource
planning cycles (RP)
For areas progressed in 2023/24, all survey results have been analysed
and if required, improvement actions identified and progressed.
Green
145

Page 146

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Housing and Land
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Develop and implement
Customer Involvement
Strategy
The new Customer Involvement Strategy will be developed,
consulted, and approved by Housing and Technical Resources
Committee by November 2023 (RP)
The new Customer Involvement Strategy has been published for
consultation between 1 September and 24 November 2023.
A consultation plan is being implemented to get feedback from a wide
range of customers.
Green
Provide high quality services to our service to our tenants, including those who live in sheltered housing and residents at our Gypsy/Travellers sites
Action Measures Comments/ Progress Status
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Complete quality assurance checks to monitor and ensure
compliance with care inspectorate standards. Each of the 34
sheltered housing complexes will be checked during 2023/24
with findings of completed checks reported on a quarterly basis
(RP)
Ongoing quality assurance and self-assessment continues to demonstrate
high levels of compliance.
Green
Work with
Gypsy/Traveller residents
to develop and
implement a programme
of site improvement
Continue to deliver co-produced Site Masterplans at both sites,
reflecting council and resident priorities (RP)
Masterplans on both sites continue to be delivered with latest projects
under development and progressing through design and procurement
phases. Resident engagement remains strong at both sites.
Green
Work in 2023/24 will continue with key projects including new
pitches, play parks and upgrade of amenity units (RP)
Key projects progressing well with consultation events and discussions
held for the new play area and amenity unit extensions at Shawlands
Crescent, as well as pitch extensions at Springbank Park.
Green
Improve outcomes for households experiencing homelessness, including access to settled accommodation
Action Measures Comments/ Progress
Physical regeneration
work in priority areas
Work with partners to bring 15 Long Term empty homes into
use by March 2024 (RP)
Work ongoing with owners of empty homes to deliver target. 13 brought
back into use YTD 2023/24.
Green
146

Page 147

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
Housing and Land
Status
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Improve access to settled
accommodation for
homeless households
Continue to implement Rapid Rehousing Transition Plan (RP) The continuing surge in demand for homelessness services which is
occurring nationally and locally is acting against achievement of the key
strategic target of reducing homelessness.
Good performance despite challenging circumstances and these significant
pressures that continue to effect homelessness services.
Amber
Implement Housing First approach, provide suitable
accommodation and support for up to 40 individuals with
complex needs by 2023/24 (RP)
In total we have supported 37 cases through Housing First, currently support
at capacity however expect to reach target by year end.
Green
Increase settled accommodation by converting 10 to 15
temporary accommodation units to Scottish Secure
Tenancies during 2023/24 (RP)
3 properties flipped during 2023/24, reduction on previous years which is
a direct result of increased demand for temporary accommodation.
Flipping properties has proven problematic in the period. General need to
identify additional units of temporary accommodation to meet increased
levels of demand.
Green
We will continue to make progress towards our target of
converting up to 100 temporary accommodation units to Scottish
Secure tenancies by 2024
Target was exceeded in 2022/23 at 105 properties now sitting with 108 at
the end of quarter 2 2023/24.
Complete
Reduce and maintain repeat instances of homelessness to below
4.5% of all cases during 2023/24 (RRTP aim is <3% over life of
plan) (RP)
Currently sitting just above 3% which is an improving position, all repeat
homeless cases are reviewed to identify patterns and to infirm future
development of services.
Green
Review of Commissioned Services exploring opportunities of
partnership working for efficiencies and to lever in funding that
will add value to existing homelessness services (RP)
Review complete, ongoing discussion with partners on consortium
approach, tender in development.
Report Later
Work to bring empty homes back into use to help meet needs within South Lanarkshire
Action Measures Comments/ Progress Status
147

Page 148

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Housing and Land
Continue to develop a range of properties to meet the council needs
Action Measures Comments/ Progress Status
Increase supply of
housing suitable for
older people
Continue to adapt suitable homes, as identified at the void
stage, will be converted to Amenity standard (RP)
At the end of quarter 2, 8 properties have been brought up to amenity
standard when last void.
Green
Continue to develop a range of properties to meet the council needs
Action Measures Comments/ Progress Status
Increase supply of
housing suitable for
older people
Total new amenity homes delivered through Affordable
Housing Supply Programme and reported to HTR Committee
through the SHIP (RP)
11 additional amenity properties YTD. Green
Our Economy
Help create town centres that offer a social, cultural and economic heat to a community and contain shared built environment, heritage and spaces that, with
the right conditions, provides inclusive and sustainable centres
Action Measures Comments/ Progress Status
Ensure effective
development of
opportunities
Support the developemnt of opportunities to re-envision and
redevelop town centres
Community and Enterprise have obtained committee approval to
continue work on EK and Hamilton masterplans. Where sites have been
identified for affordable housing, site markers are identified within SHIP
2024-29.
Green
Delivering the plan and achieving best value
The Council Demonstrates high standards of governance and sound financial 
Action Measures Comments/ Progress Status
148

Page 149

Resource Plan actions and measures South Lanarkshire Council - Housing and Technical
IMPROVe - SLC Performance Management System       Report printed on Monday 8 January 2024
Ensure effective
management of all
Resource budgets and
Business Plans
Overall budgetary targets achieved by March 2024 We anticipate that overall budgetary targets will be achieved by the end
of the financial year.
Green
Digital and ICT Services meet the needs of the council and its customer 
Action Measures Comments/ Progress Status
Progress the council's
Digital Strategy within
the Resource
Progress the implementation of a new Integrated Housing and
Property management system, including sourcing a new
supplier and contract negotiations (RP)
Capita are now confirmed as the supplier and project plan in place and
on target.
Green
149

Page 150

Appendix 3
Housing and Technical Resource Plan 2022/2023 Quarter 4 Progress - ‘Report
later’ measures – update of status/comments
Measure Comments at
Quarter 4
Previous year
Updated
Q4
Status 
Updated comments
% of Council dwellings
that are Energy Efficiency
Standard for Social
Housing 2 (EESSH2)
HTR
The 2025 and 2032
EESSH milestones have
been suspended as the
Scottish Government
are reviewing the
EESSH2 standards to
strengthen and realign
the standard with the
target for net zero heat
in houses from 2045.
Report
Later
Scottish Government opened
consultation on 28 November
on their proposals for Social
Housing Net Zero Standard
(SHNZS) in Scotland, the
contents of which are being
reviewed.
150

Page 151

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 7 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: Delegated Authority Report – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise on transactions processed by delegated authority by Property Services
during Quarters 2 and 3 of 2023/2024. 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the transactions processed by delegated authority by Property Services
during Quarters 2 and 3 of 2023/2024, be noted 
3. Background
3.1. The Executive Director (Housing and Technical Resources) has delegated authority
to deal with various transactions including:- 
 leases of a value up to £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
3.2. Delegated authority reports are prepared by case officers and submitted to the Head
of Property Services for approval once provisional agreement has been reached with
the third party.  A weekly list of approved reports is published on the Council’s intranet
under “Estates Property Transactions”. 
3.3. The delegated reports provide authority for officers to progress transactions and where
appropriate, to instruct Legal Services.  The receipt of any monies arising from the
transactions occurs at a date in the future once missives have been concluded and
any suspensive conditions met.  It should be noted that some transactions may never
settle. 
4.  Summary Quarter 2, 2023/2024
4.1. The summary of transactions progressed under delegated authority during Quarter 2
of 2023/24 is shown in Appendix 1, column 2, however, can be summarised as
follows:- 
Total number of transactions 107 
Total value of lease transactions £91,405.30 per annum 
Total value of capital transactions £7,176,652 
Total number of miscellaneous transactions 21
18
151

Page 152

5. Summary Quarter 3, 2023/2024
5.1. The summary of transactions progressed under delegated authority during Quarter 3
of 2023/2024 is shown in Appendix 1, column 3, however, can be summarised as
follows:- 
Total number of transactions 103 
Total value of lease transactions £83,302.29 per annum 
Total value of capital transactions £6,949,200 
Total number of miscellaneous transactions 0 
5.2.  The overall profile of the volume and value of transactions during 2023/2024 generally
compares with previous years, however, there is an increase in the number of
acquisitions reflecting the outcomes of the Council House Open Market Purchase
Scheme.   
6. Employee Implications
6.1. There are no employee implications. 
7. Financial Implications
7.1. The rental income to the Council is increased as a result of the new lettings and lease
renewals.   
7.2. Disposals generate additional capital monies for the Council’s Capital Programme. 
7.3. Acquisitions are carried out in accordance with project plans and approved capital
budgets to enable investment programmes to proceed. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and environment
contained within this report. 
9. Other Implications
9.1. There is a low risk that the rental and capital receipts identified within these delegated
authority reports are not achieved if, for reasons outwith the Council’s control, the
tenant/purchaser chooses not to proceed with the transactions.  However, Property
Services has in place procedures and consultations intended to minimise this risk. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation takes place with the occupying Resource, Planning, Roads and Legal
Services on a transaction by transaction basis as and when required. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
152

Page 153

Previous References
 Housing and Technical Resources Committee, 30 August 2023
 Housing and Technical Resources Committee, 30 May 2023 
List of Background Papers
 Plans and drawings of the property involved in these transactions can be obtained from
the Assets and Estates Team, Property Services
 Weekly List of Delegated Authority Transactions can be obtained on the Council’s intranet 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
153

Page 154

Appendix 1 
Delegated Authority Transactions 
Transaction Type  Quarter 2
2023/24 
Quarter 3
2023/24 
No Value No Value     
Lease Renewal 0 £0 2 £26,000     
New Lease/ Licence 
Landlords Consent
10 
4
£64,905.30 
£0
7
0
£40,802.29 
£0     
Assignation 2 £0 2 £0     
Rent Review 1 £26,500 1 £16,500     
Total Revenue  17  £91,405.30  12  £83,302.29     
Disposal 4 £103,100 5 £13,400     
Compensation 0 £0 18 £142,800     
Wayleave/Servitude 4    £10,450 1 £0     
Acquisition 
Title Waiver
61 
0
£7,063,101 
£0
67 
0
£6,793,000 
£0     
Total Capital  69  £7,176,651  91  £6,949,200     
Miscellaneous 21 £1 0 £0 
154