Agenda Document Pack - Housing and Technical Resources Committee - 30/08/2023

South Lanarkshire Council · 30 August 2023
Back to Housing and Technical Resources Committee — 30 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 22 August 2023 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 30 August 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Davie McLachlan (Chair), Martin Lennon (Depute Chair), Joe Fagan (ex officio), Walter Brogan,
Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry Convery, Margaret Cooper, Andrea
Cowan, Maureen Devlin, Colin Dewar, Allan Falconer, Grant Ferguson, Alistair Fulton, Ross
Gowland, Geri Gray, Ross Lambie, Richard Lockhart, Julia Marrs, Ian McAllan, Kenny McCreary,
Norman Rae, David Shearer, Margaret B Walker, Kirsty Williams 
Substitutes
John Bradley, Robert Brown, Poppy Corbett, Gladys Ferguson-Miller, Martin Hose, Cal Johnston-
Dempsey, Gavin Keatt, Susan Kerr, Eileen Logan, Monique McAdams, Richard Nelson, Helen
Toner, David Watson, 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources held on 31 May
2023 submitted for approval as a correct record. (Copy attached) 
5 - 12 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 29 June 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
13 - 18 
4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 29 June 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
19 - 22 
5 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 2 August 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
23 - 28 
6 Revenue Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 2 August 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
29 - 32 
7 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 9 August 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
33 - 36 
8 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 29 June 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
37 - 40 
9 Capital Budget Monitoring 2023/2024 - Housing and Technical Resources
(Excl Housing Revenue Account (HRA))
Joint report dated 9 August 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
41 - 44 
10  Capital Budget Monitoring 2023/2024 - Housing and Technical Resources
(Housing Revenue Account (HRA))
Joint report dated 2 August 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
45 - 48 
11  Housing and Technical Resources - Workforce Monitoring - April to June
2023
Joint report dated 26 July 2023 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
49 - 54
2

Page 3

12  Housing and Technical Resource Plan Quarter 4 Progress Report
2022/2023
Report dated 9 August 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
55 - 80 
Item(s) for Decision 
13  Scottish Housing Regulator – Annual Assurance Statement 2022/2023
Report dated 20 July 2023 by the Executive Director (Housing and Technical
Resources). (Copy attached) 
81 - 86 
14  Annual Review of the South Lanarkshire Rapid Rehousing Transition Plan
2022/2023
Report dated 18 July 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
87 - 138 
15  Disposal of Domestic Council Properties within Castlebank House, Lanark
Report dated 9 August 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
139 - 144 
16  Community Facility Review – Ward 7, East Kilbride Central South
Joint report dated 26 July 2023 by the Executive Directors (Housing and
Technical Resources) and (Community and Enterprise Resources).  (Copy
attached) 
145 - 150 
17  2 & 2A Langlands Avenue, Kelvin South Industrial Estate, East Kilbride –
Lease to Ellsworth Adhesives Limited
Report dated 27 July 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
151 - 154 
18  Floor 14, Council Offices, Almada Street, Hamilton – Extension of Lease to
SEEMiS Group LLP
Report dated 27 July 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
155 - 156 
19  Stewartfield Community Centre, East Kilbride – Asset Transfer to
Badminton Academy Social Enterprise
Report dated 30 July 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
157 - 162 
Urgent Business 
20  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 31 May 2023 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Mathew Buchanan, Councillor Janine Calikes, Councillor Gerry
Convery, Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Allan Falconer, Councillor Grant Ferguson, Councillor Ross
Gowland, Councillor Geri Gray, Councillor Cal Johnston-Dempsey (substitute for Councillor Archie
Buchanan), Councillor Ross Lambie, Councillor Martin Lennon (Depute), Councillor Richard
Lockhart, Councillor Julia Marrs, Councillor Ian McAllan, Councillor Kenny McCreary, Councillor
Norman Rae, Councillor David Shearer 
Councillors' Apologies:
Councillor John Bradley, Councillor Archie Buchanan, Councillor Joe Fagan (ex officio), Councillor
Alistair Fulton, Councillor Margaret B Walker 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Resources); H Calley, Administration Officer; C Cumming, Personnel
Adviser; M M Wilson, Legal Services Manager; L Wyllie, Administration Assistant
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services; J Forbes, Head of Property
Services; C Mitchell, Strategy and Support Manager 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Housing and Technical Resources Committee held on 15
March 2023 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Housing and Technical Resources – Workforce Monitoring – January to March
2023
A joint report dated 14 April 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted on the following employee
information for Housing and Technical Resources for January to March 2023:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
2
5

Page 6

The Committee decided: that the report be noted. 
[Reference:  Minutes of 15 March 2023 (Paragraph 8)] 
4 Housing and Technical Resource Plan 2023/2024
A report dated 10 May 2023 by the Executive Director (Housing and Technical Resources) was
submitted on the Housing and Technical Resource Plan 2023/2024. 
Details were provided on the Resource Plan for 2023/2024, attached as Appendix 1 to the
report, which outlined the:- 
 key areas of focus for the year ahead
 Resource outcomes
 measures and actions
 resourcing of the Plan 
The Resource had established a number of outcomes to support the delivery of the Council
Plan, Connect, in 2023/2024.  To support those outcomes, the Resource had developed
performance measures in an action plan detailed in Section 4 of the Resource Plan.  Key or
strategic measures would be included in the Council Plan progress reports 2023/2024, with the
remaining measures being monitored and reported at Resource level. 
Following approval at individual Resource Committees, the Resource Plans for 2023/2024
would be submitted, as a pack, to the meeting of the Executive Committee to be held on 21
June 2023 for noting. 
In line with the Council’s performance management arrangements, a mid-year progress report
on measures identified in the 2023/2024 Housing and Technical Resource Plan and an end of
year report respectively would be submitted to future meetings of the Committee. 
Once approved, the Resource Plan would be made available on the Council’s website. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Resource Plan 2023/2024, attached as Appendix 1 to the report, be approved; 
(2) that the Resource Plan 2023/2024 be uploaded onto the Council’s website; 
(3) that it be noted that, following Committee approval, all Resource Plans would be submitted
to the Executive Committee on 21 June 2023 for noting; and 
(4) that it be noted that Progress Reports on the Resource Plan 2023/2024 would be
submitted, at Quarter 2 and Quarter 4, to future meetings of this Committee. 
Councillors Cooper and Gray joined the meeting during this item of business
6

Page 7

5 Pavilion at Alexander Hamilton Memorial Park, Stonehouse – Asset Transfer to
Friends of Stonehouse Park
A report dated 24 April 2023 by the Executive Director (Housing and Technical Resources) was
submitted on a request for asset transfer, by lease, of the pavilion within Alexander Hamilton
Memorial Park, Stonehouse, to Friends of Stonehouse Park and requesting approval of the
principal terms and conditions of asset transfer, as detailed in the report. 
The Council owned a pavilion within the Alexander Hamilton Memorial Park, Stonehouse which
had not been used for many years and was in poor condition. 
Friends of Stonehouse Park was a local community organisation that worked in partnership with
the Council to deliver projects and run local events in the park.  Friends of Stonehouse Park had
submitted a request for Community Asset Transfer of the pavilion, by lease, the validation date
for which was 11 January 2023. 
In addition to placing the application and supporting documentation on the Council’s Planning
Portal, notices had been placed on the property advising that the Council was considering an
asset transfer.  The closing date for responses had been 6 March 2023, at which time 31
representations had been received which were all supportive of the proposal. 
The request had been placed before the Community Asset Transfer Assessment Panel and
details of the matters taken into consideration were provided in the report. 
The property did not have independent vehicular access, therefore, in any lease agreement,
there would be exclusive occupation of the building but  non-exclusive access rights through the
park.  There were private residencies within the park which shared the existing access
arrangements. 
The pavilion housed electrical equipment that served the wider park and alterations would be
required to ensure that the Council could continue to access this equipment. 
The Council had a clear and marketable title, however, the existing lease with South Lanarkshire
Leisure and Culture would require to be terminated.  Planning Services had indicated that
planning consent would be required for change of use. 
The in-house Valuer had placed a rental value of £1 per annum on the property which reflected
the level of investment required to bring the property back into use and its location within the
public park. 
The proposal was for a 15-year lease followed by phased investment in the property.  Initially,
the electrical equipment access would be created and the wind and watertight repairs would be
undertaken by the Council to allow the organisation to store its equipment and supplies. 
The property would be refurbished by Friends of Stonehouse Park to provide a Community Hub
with kitchen/café, toilets and meeting space, and would be available to other community
organisations. 
A funding application would be made to the Council’s Community Asset Transfer fund for the
costs of redesigning the electrical supply area to enable external and secure access.  This work
would be carried out by the Council. 
It was proposed to grant the lease of the pavilion at Alexander Hamilton Memorial Park,
Stonehouse, as shown on the plan attached to the report, to Friends of Stonehouse Park, on the
principal terms and conditions as detailed in the report.
7

Page 8

The Committee decided: 
(1) that the pavilion at Alexander Hamilton Memorial Park, Stonehouse, be leased to Friends
of Stonehouse Park, subject to the terms and conditions outlined in the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction with the
Head of Administration and Legal Services, be authorised to conclude all matters in
respect of the lease and enter into the necessary legal agreements on terms which were in
the best interests of the Council. 
6 The Fountain, Lesmahagow – Lease to Lesmahagow Development Trust
A report dated 26 April 2023 by the Executive Director (Housing and Technical Resources) was
submitted on a request for a lease of The Fountain, Lesmahagow to Lesmahagow Development
Trust and requesting approval of the principal terms and conditions as set out in the report. 
The subjects at The Fountain, Lesmahagow had been, until recently, managed by South
Lanarkshire Leisure and Culture (SLLC).  Following a review of its business plan, the SLLC
Board announced that it could not sustain service delivery from this facility and control had been
returned to the Council. 
Lesmahagow Development Trust had approached the Council requesting an annual lease of the
subjects to enable the facility to re-open for community use and enable the Trust to operate the
facility whilst testing the viability of a future Community Asset Transfer (CAT).  This was not a
formal CAT request in terms of the Community Empowerment (Scotland) Act 2015, however,
similar matters had been considered. 
The extent of the property was shown on the plan attached to the report and, as there was no
change of use or development, proposed planning consent would not be required. 
Part of the subjects at The Fountain was currently leased to the Bank of Scotland and this area
would be excluded from the lease to Lesmahagow Development Trust and would remain with
the Council. 
The upper floor of the property was a former flat which was in poor condition.  Lesmahagow
Development Trust was content that the flat be included in the lease, subject to the outcome of
its building condition survey. 
It was proposed to lease the subjects at The Fountain, Lesmahagow to Lesmahagow
Development Trust on the principal terms and conditions as detailed in the report. 
At the expiry of the lease, the Council and Lesmahagow Development Trust would consider
renewal of the lease, subject to being satisfied as to the operation of the subjects by the Trust. 
The Committee decided: 
(1) that the subjects at The Fountain, Lesmahagow be leased to Lesmahagow Development
Trust on the terms and conditions outlined in the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction with the
Head of Administration and Legal Services, be authorised to conclude all matters in
respect of the lease and enter into the necessary legal agreements on terms which were in
the best interests of the Council.
8

Page 9

7 Annual Update on the Property Asset Management Plan 2021 to 2025
A report dated 11 May 2023 by the Executive Director (Housing and Technical Resources) was
submitted:- 
 on the outcomes of the Property Asset Management Plan 2021 to 2025 annual update
2022, including the Local Government Benchmarking Framework (LGBF) Indicator
outcomes for Property Condition and Suitability
 on the outcomes of the review into the extended model for Corporate Asset Management
Plans
 advising of the development of a new Energy Demand Reduction Plan to be incorporated
into the Property Asset Management Plan 2021 to 2025 
The Committee decided: 
(1) that the 2022 update to the Property Asset Management Plan 2021 to 2025, including the
updated Local Government Benchmarking Framework Indicator outcomes for Property
Condition and Suitability, be noted; 
(2) that the outcomes of the review into the extended model for Corporate Asset Management
Plans be noted; and 
(3) that proposals to develop a new Energy Demand Reduction Plan within the Property Asset
Management Plan 2021 to 2025 be noted. 
[Reference: Minutes of 8 December 2021 (Paragraph 15)] 
8 Revision of Costs Associated with the Acquisition of Houses at Brackenhill Farm,
Hamilton - Section 75 Planning Reference PL/21/2093
A report dated 21 April 2023 by the Executive Director (Housing and Technical Resources) was
submitted advising on the action taken, in terms of Standing Order No 37(c), because of the
timescales involved, by the Executive Director (Housing and Technical Resources), in
consultation with the Chair and an ex officio member, to conclude the contract with Taylor
Wimpey in relation to the revision of costs associated with the acquisition of houses at
Brackenhill Farm, Hamilton. 
On 14 December 2022, this Committee agreed that the Executive Director (Housing and
Technical Resources) be authorised to acquire 50 completed affordable homes from Taylor
Wimpey for a total price not in excess of £8.545 million, which included the cost of land, to fulfil
the planning obligations associated with the residential development of the site. 
Following that approval, Taylor Wimpey had advised the Council that it had not included costs
for full Electrical Vehicle Charging Points (EVCPs) to be installed for each dwelling being
purchased by the Council on the site.  Instead, it opted to provide costs relating only to the
ducting and infrastructure, with the EVCPs to be installed at a later date.  Installation of full
EVCPs for each unit on the site was, however, required, as set out in Supplementary Planning
Guidance to the South Lanarkshire Local Development Plan 2. 
Therefore, an additional £166,000 was required to complete the transaction and authority had
been requested, by the Executive Director (Housing and Technical Resources), to acquire 50
completed affordable homes at the revised cost of £8.711 million. 
9

Page 10

Despite the increase in costs outlined in the report as a result of the requirements of installing
full EVCPs, there would be no further financial implications associated with the acquisition.  The
revised costs remained within the financial assumptions made and, as such, would continue to
have a neutral impact on the Housing Revenue Account Business Plan. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the action taken, in terms of Standing Order No 37(c), because of the timescales
involved, by the Executive Director (Housing and Technical Resources), in consultation
with the Chair and an ex officio member, to conclude the contract with Taylor Wimpey in
relation to the revision of costs associated with the acquisition of houses at Brackenhill
Farm, Hamilton, be noted; and 
(2) that the authority granted to the Executive Director (Housing and Technical Resources), in
consultation with the Head of Administration and Legal Services, to conclude matters and
to enter into the necessary legal agreements on terms which were in the best interests of
the Council, be noted. 
[Reference: Minutes of 14 December 2022 (Paragraph 9)] 
9 Delegated Authority Report – Update
A report dated 6 April 2023 by the Executive Director (Housing and Technical Resources) was
submitted on transactions processed by Property Services during Quarter 4 of 2022/2023,
together with a year-end summary. 
The Executive Director (Housing and Technical Resources), under delegated powers, had
authority to deal with various transactions including:- 
 leases up to the value of £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
Details of the transactions undertaken during Quarter 4 and the annual summary for 2022/2023,
as contained in Appendix 1 of the report, were as follows:- 
Quarter 4 2022/2023:
Number of transactions 38
Total value of lease transactions £68,669 per annum
Total value of capital transactions £1,584,075
Total value of miscellaneous transactions Nil 
Annual Summary 2022/2023:
Number of transactions 216
Total value of lease transactions £597,477 per annum
Total value of capital transactions £6,229,202
Total value of miscellaneous transactions £55,502  
The Committee decided: that the report be noted. 
[Reference: Minutes of 15 March 2023 (Paragraph 12)] 
10

Page 11

10 Notification of Contracts Awarded - 28 October 2022 to 31 March 2023
A report dated 11 April 2023 by the Executive Director (Housing and Technical Resources) was
submitted on contracts awarded by Housing and Technical Resources, valued in excess of
£50,000, in the period 28 October 2022 to 31 March 2023, as follows:- 
 contracts awarded by Consultancy Services
 contracts awarded by the Procurement Team 
Details of the contracts and projects were provided in the appendices to the report. 
Officers responded to a member’s question in relation to a particular contract. 
The Committee decided: 
(1) that the contracts awarded by Consultancy Services, as detailed in Appendix A to the
report, be noted; and 
(2) that the contracts awarded by the Procurement Team, as detailed in Appendix B to the
report, be noted. 
[Reference: Minutes of 14 December 2022 (Paragraph 19)] 
11 Urgent Business 
There were no items of urgent business.
11

Page 12

12

Page 13

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 31 March 2023 for Housing and Technical
Resources (excl HRA).
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the overspend of £0.080 million, as at 31 March 2023 on Housing and
Technical Resources (excl HRA) Revenue Budget, after transfers to reserves,
as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements, be approved
[1recs]
3. Background
3.1. This is the fifth revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) on Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 31 March 2023, there is an overspend of £0.005 million against the phased
budget.  This was the position before transfers to reserves.  The position reported in
the paper includes an agreed transfer to reserves (as detailed in Appendix C)
approved by the Executive Committee on 21 June 2023.  The Resource position as
at 31 March 2023, after the transfers to reserves were approved, is an overspend of
£0.080 million. 
5.2. The agreed transfer to reserves is in relation to Local Heat and Energy Efficiencies
Strategies (LHEES) funding committed in 2023/2024 for costs associated with
preparing and publishing the LHEES strategy and delivery plan.
3
13

Page 14

5.3. The overspend is due to the net effect of overspends in Property Maintenance and
Estates, offset by underspends in Office Accommodation and the Scheme of
Assistance budget.  There were also minor net underspends in relation to Other
Housing, Supporting People and CCTV. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed.  In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
we have mitigated through providing additional funds in future year’s budget strategy
and in this year, through some reserve funds available. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
29 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 21 June 2023 
List of Background Papers
 Financial ledger and budget monitoring results to 31 March 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail:  Graham.Booth@southlanarkshire.gov.uk
14

Page 15

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2023 (No.14) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
31/03/23
Actual
31/03/23
Variance
31/03/23 
%
Variance
31/03/23 Notes            
Budget Category            
Employee Costs 46,368  45,922  446  46,368  45,917  451  under 1.0% 
Property Costs 22,240  23,069  (829) 22,240  23,603  (1,363) over (6.1%) 
Supplies & Services 14,348  11,303  3,045  14,348  12,096  2,252  under 15.7% 
Transport & Plant 4,746  4,289  457  4,746  4,487  259  under 5.5% 
Administration Costs 3,627  3,627  0  3,627  3,750  (123) over (3.4%) 
Payments to Other Bodies 9,181  9,247  (66) 9,181  8,966  215  under 2.3% 
Payments to Contractors 18,500  14,479  4,021  18,500  17,231  1,269  under 6.9% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  161  (7) 154  180  (26) over (16.9%) 
Total Controllable Exp. 119,164  112,097  7,067  119,164  116,230  2,934  under 2.5% 
Total Controllable Inc. (100,211) (92,802) (7,409) (100,211) (97,272) (2,939) under
recovered (2.9%) 
Net Controllable Exp. 18,953  19,295  (342) 18,953  18,958  (5) over 0.0% 
Transfer to Reserves as
at (31/03/23) 0  0  0  0  75  (75) over   
Position After Transfers
to Reserves (31/03/23) 18,953  19,295  (342) 18,953  19,033  (80) over 0.4% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate.
15

Page 16

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2023 (No.14) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
31/03/23
Actual
31/03/23
Variance
31/03/23 
%
Variance
31/03/23 Notes            
Budget Category            
Employee Costs 2,990  3,080  (90) 2,990  3,220  (230) over (7.7%) 1, a,
b
Property Costs 7,443  7,678  (235) 7,443  7,390  53  under 0.7% 2, a,
c
Supplies & Services 311  297  14  311  322  (11) over (3.5%) a, d
Transport & Plant 198  109  89  198  167  31  under 15.7% a
Administration Costs 161  165  (4) 161  170  (9) over (5.6%) a
Payments to Other Bodies 5,001  5,033  (32) 5,001  4,674  327  under 6.5% 3, a,
d, e
Payments to Contractors 2,419  2,188  231  2,419  2,310  109  under 4.5% 4, c
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  18  (7) 11  20  (9) over (81.8%) 
Total Controllable Exp. 18,534  18,568  (34) 18,534  18,273  261  under 1.4% 
Total Controllable Inc. (9,194) (9,228) 34  (9,194) (9,036) (158) under
recovered (1.7%) 5, a
Net Controllable Exp. 9,340  9,340  0  9,340  9,237  103  under 1.1% 
Transfer to Reserves as
at (31/03/23) 0  0  0  0  75  (75)  over   
Position After Transfers
to Reserves (31/03/23) 9,340  9,340  0  9,340  9,312 28  under 0.3% 
Variance Explanations 
1. The overspend relates to staffing costs within the homeless service and is offset by underspends in payments to other bodies and payments to
contractors.
2. The costs in relation to temporary accommodation were lower than anticipated.
3. The underspend relates to the homelessness budget where expenditure varies according to service requirements and is offset by the overspend in
employee costs.
4. The underspend relates to commissioned services in the homelessness budget where expenditure varies according to service requirements.
5. The under recovery relates to the income for Homelessness temporary accommodation and is offset by underspends elsewhere within the service. 
Budget Virements 
a. Realignment of budget in relation to Ukraine Refugee funding. Net Nil: Employee costs £0.189m, Property costs £0.877m, Supplies & services
(£0.004m), Transport & plant £0.003m, Administration costs £0.013m, Payments to other bodies £0.284m and Income (£1.362m).
b. Transfer of budget for Apprentice Levy. Net £0.011m: Employee Costs £0.011m.
c. Transfer to Reserves for Homelessness for use in future years. Net (£0.486m): Property Costs (£0.156m) and Payments to Contractors (£0.330m).
d.  Realignment of budgets within Other Housing Services. Net Nil: Supplies and Services £0.024m and Payments to Other Bodies (£0.024m).
e. Transfer to Reserves for Rapid Re-housing Transition for use in future years. Net (£0.017m): Payments to Other Bodies (£0.017m). 
16

Page 17

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2023 (No.14)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
31/03/23
Actual
31/03/23
Variance
31/03/23 
%
Variance
31/03/23 Notes            
Budget Category            
Employee Costs 43,378  42,842  536  43,378  42,697  681  under 1.6% 1, a
Property Costs 14,797  15,391  (594) 14,797  16,213  (1,416) over (9.6%) 2, b,
c, d
Supplies & Services 14,037  11,006  3,031  14,037  11,774  2,263  under 16.1% 3, e
Transport & Plant 4,548  4,180  368  4,548  4,320  228  under 5.0% 4
Administration Costs 3,466  3,462  4  3,466  3,580  (114) over (3.3%) 5, c
Payments to Other Bodies 4,180  4,214  (34) 4,180  4,292  (112) over (2.7%) 6
Payments to Contractors 16,081  12,291  3,790  16,081  14,921  1,160  under 7.2% 7
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143  143  0  143  160  (17) over (11.9%) 
Total Controllable Exp. 100,630 93,529 7,101  100,630  97,957  2,673  under 2.7% 
Total Controllable Inc. (91,017) (83,574) (7,443) (91,017) (88,236) (2,781) under
recovered (3.1%) 8, c,
d, e
Net Controllable Exp. 9,613  9,955  (342) 9,613  9,721  (108) over (1.1%) 
Transfer to Reserves as
at (31/03/23) 0  0  0  0  0  0 -   
Position After Transfers
to Reserves (31/03/23) 9,613  9,955  (342) 9,613  9,721  (108) over (1.1%) 
Variance Explanations 
1. The underspend relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are determined.
2. The overspend relates to increased service charges within Estates Services and higher than anticipated costs in relation to property maintenance
expenditure due to severe weather and additional costs for the internal contractor.
3. The level of expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue
works.
4. The level of expenditure on scaffolding, plant and other transportation costs varies depending on the current workload demands and timing of works on a
wide variety of capital and revenue works.
5. This overspend reflects the costs in relation to membership fee / subscriptions across building services.
6. This reflects the level of demand for owners’ grants relating to the participation in the Housing Investment projects.
7. The use of private contractors varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
8. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
a. Transfer of budget for Apprentice Levy. Net £0.163m: Employee Costs £0.163m.
b.  Transfer of funding in relation to utilities costs for office accommodation. Net £0.180m: Property Costs £0.180m.
c. Realignment of central support budgets including transfer to Finance and Corporate Resources. Net (£0.046m): Property Costs £0.056m, Administration
Costs (£0.132m) and Income £0.030m.
d. Realignment of budget in relation to additional planned maintenance funding. Net Nil: Property Costs £0.052m and Income (£0.052m).
e. Realignment of budget in relation to Scheme of Assistance. Net Nil: Supplies & Services (£0.201m) and Income £0.201m. 
17

Page 18

18

Page 19

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Housing and
Technical Resources (Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 31 March 2023 for Housing and Technical
Resources (HRA)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report, be noted 
(2) that the proposed budget virements, be approved
1recs]
3. Background
3.1. This is the fifth revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 31 March 2023, there is a breakeven position against the phased budget.  The
breakeven position was after a final transfer from the balance sheet of £3.990
million.  The original budget anticipated a drawdown from reserves of £3.500 million
would be required, although this was projected to be £5.840 million at outturn. 
5.2. The required drawdown position is primarily due to overspends in repairs and
maintenance as result of demands on the service, the overall cost of providing the
service by the internal contractor and unexpected costs in relation to the severe
weather incident in December.  This was offset by underspends in employee costs,
bad debt provision, loan charge repayments, an over recovery in rental income and
expected insurance recoveries for the severe weather incident.  Further details on
the variances for the HRA are detailed in Appendix A. 
4
19

Page 20

6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed.  In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
these pressures are assessed and managed within the budget planning exercise for
current and future years. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
29 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 21 June 2023 
List of Background Papers
 Financial ledger and budget monitoring results to 31 March 2023. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail:  Graham.Booth@southlanarkshire.gov.uk
20

Page 21

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 31 March 2023 (No.14) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
31/03/23
Actual
31/03/23
Variance
31/03/23 
%
Variance
31/03/23 Notes            
Budget Category            
Employee Costs 14,641  14,140  501  14,641  14,342  299  under 2.0% 1
Property Costs 45,239  51,757  (6,518) 45,239  52,852  (7,613) over (16.8%) 2, a,
b
Supplies & Services 609  1,021  (412) 609  793  (184) over (30.2%) 3
Transport & Plant 195  183  12  195  127  68  under 34.9% 4
Administration Costs 5,644  5,593  51  5,644  5,532  112  under 2.0% 5
Payments to Other Bodies 3,141  3,165  (24) 3,141  3,154  (13) over (0.4%) b
Payments to Contractors 100  80  20  100  135  (35) over (35.0%) 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 26,050  26,050  0  26,050  25,451  599  under 2.3% 6                   
Total Controllable Exp. 95,619  101,989  (6,370) 95,619  102,386  (6,767) over (7.1%) 
Total Controllable Inc. (110,444) (110,919) 475  (110,444) (112,588) 2,144  over
recovered 1.9% 7, a
Transfer to/(from) Balance
Sheet (3,500) (5,840) 2,340  (3,500) (3,990) 490  over
recovered 14.0% 8
Net Controllable Exp. (18,325) (14,770) (3,555) (18,325) (14,192) (4,133) over (22.6%) 
Loan Charges 18,325  14,770  3,555  18,325  14,192  4,133  under   9
Net Controllable Exp. 0  0  0  0  0  0  - 0.0% 
Variance Explanations 
1. This underspend reflects higher than anticipated staff turnover within the Service.
2. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor, and additional repairs
costs due to the cold weather incident in December 2022 covered by income from an insurance claim (refer 7.). This was partly offset by a lower than
budgeted level of bad debt provision required as collection rates have been better than forecast. 
3. This overspend reflects payments and consultancy related costs for the new IT system which is under development.
4. The underspend reflects lower than forecast embedded pool car costs across the service, reflecting changing working practices with meetings taking
place online rather than in person.
5. A large element of this underspend is due to the demand led legal expenses and the underspend reflects the level of eviction action.
6. The interest on revenue balances is impacted by the levels held and interest rates and was significantly higher than budget.
7. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent as well as income
assumed from an insurance claim relating to the costs for the cold weather incident (refer 2.).
8. The net combined overspend requires for a higher than budgeted level of transfer from reserves but is overall lower than the level of reserves predicted
to be required at outturn. 
9. The overall level of debt charges was lower than anticipated due to the profile of funding requirements. 
Virements 
a. Budget realignment to reflect the annual demand levels (expenditure and income) for owner occupier energy efficiency measures. Net £0.000m:
Property Costs (£1.556m) and Income £1.556m.
b. An allocation of £0.111m was transferred from Bad Debt Provision to allow for Tenancy Sustainment measures. Net £0.000m: Property Costs (£0.111m)
and Payments to Other Bodies £0.111m. 
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2023/2024 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 14 July 2023 for Housing and Technical
Resources (excl HRA).
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position as at 14 July 2023 on Housing and Technical
Resources (excl HRA) Revenue Budget, as detailed in Appendix A of the
report, be noted; and
(2) that the proposed budget virements, be approved.
[1recs]
3. Background
3.1. This is the first revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Housing and Technical Resources (excl
HRA) on Appendix A, then details the individual services in Appendices B and C. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 14 July 2023, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed.  In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
we have mitigated through providing additional funds in future year’s budget strategy
and in this year, through some reserve funds available. 
5
23

Page 24

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
2 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 16 August 2023 
List of Background Papers
 Financial ledger and budget monitoring results to 14 July 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Graham.Booth@southlanarkshire.gov.uk
24

Page 25

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 14 July 2023 (No.4) 
Housing and Technical Resources Summary (excl HRA)                
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
14/07/23
Actual
14/07/23
Variance
14/07/23 
%
Variance
14/07/23 Notes            
Budget Category            
Employee Costs 46,966  46,966  0  12,452  12,034  418  under 3.4% 
Property Costs 18,368  18,368  0  7,399  7,542  (143) over (1.9%) 
Supplies & Services 14,210  14,210  0  3,501  3,819  (318) over (9.1%) 
Transport & Plant 4,722  4,722  0  1,419  1,429  (10) over (0.7%) 
Administration Costs 3,756  3,756  0  75  48  27  under 36.0% 
Payments to Other Bodies 6,854  6,854  0  1,459  1,455  4  under 0.3% 
Payments to Contractors 18,790  18,790  0  2,313  1,868  445  under 19.2% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 154  154  0  8  7  1  under 12.5% 
Total Controllable Exp. 113,820  113,820  0  28,626  28,202  424  under 1.5% 
Total Controllable Inc. (99,644) (99,644) 0  (15,185) (14,761) (424) under
recovered (2.8%) 
Net Controllable Exp. 14,176  14,176  0  13,441  13,441  0  - 0.0% 
Transfer to Reserves as
at (14/07/23) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (14/07/23) 14,176  14,176  0  13,441  13,441  0  - 0.0% 
Variance Explanations 
Variances are shown in Appendix B and C as appropriate. 
Budget Virements 
Virements are shown in Appendix B and C as appropriate.
25

Page 26

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 14 July 2023 (No.4) 
Housing Services 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
14/07/23
Actual
14/07/23
Variance
14/07/23 
%
Variance
14/07/23 Notes            
Budget Category            
Employee Costs 3,756  3,756  0  1,013  999  14  under 1.4% a, b
Property Costs 6,260  6,260  0  2,170  2,208  (38) over (1.8%) b
Supplies & Services 211  211  0  96  97  (1) over (1.0%) b
Transport & Plant 193  193  0  34  40  (6) over (17.6%) b
Administration Costs 157  157  0  11  5  6  under 54.5% b
Payments to Other Bodies 3,981  3,981  0  1,074  1,069  5  under 0.5% a, b,
c
Payments to Contractors 2,709  2,709  0  265  265  0  - 0.0% a, c
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 11  11  0  1  0  1  under 100.0% 
Total Controllable Exp. 17,278  17,278  0  4,664  4,683  (19) over (0.4%) 
Total Controllable Inc. (8,814) (8,814) 0  (1,943) (1,962) 19  over
recovered 1.0% b
Net Controllable Exp. 8,464  8,464  0  2,721  2,721  0  - 0.0% 
Transfer to Reserves as
at (14/07/23) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (14/07/23) 8,464  8,464  0  2,721  2,721  0  - 0.0% 
Variance Explanations 
No significant variances to report. 
Budget Virements 
a. Realignment of Housing Advice and Support Team Establishment Costs. Net £0.000m: Employee Costs £0.396m, Payments to Other Bodies (£0.284m)
and Payments to Contractors (£0.112m).
b. Ukraine refugee budget funding realignments Net £0.000m: Employee costs £0.947m, Property costs £0.841m, Supplies & Services £0.128m, Transport
& Plant £0.096m, Administration costs £0.014m, Payments to other bodies £0.218m and Income (£2.244m).
c. Transfer of Living Wage funding from Social Work Resources. Net £0.091m: Payments to Other Bodies £0.019m and Payments to Contractors £0.072m. 
26

Page 27

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 14 July 2023 (No.4)  
Property Services 
Annual
Budget
Forecast for
Year
Annual
Forecast
Variance
Budget
Proportion
14/07/23
Actual
14/07/23
Variance
14/07/23 
%
Variance
14/07/23 Notes            
Budget Category            
Employee Costs 43,210  43,210  0  11,439  11,035  404  under 3.5% 1
Property Costs 12,108  12,108  0  5,229  5,334  (105) over (2.0%) 2, a,
b
Supplies & Services 13,999  13,999  0  3,405  3,722  (317) over (9.3%) 3
Transport & Plant 4,529  4,529  0  1,385  1,389  (4) over (0.3%) c
Administration Costs 3,599  3,599  0  64  43  21  under 32.8% 
Payments to Other Bodies 2,873  2,873  0  385  386  (1) over (0.3%) 
Payments to Contractors 16,081  16,081  0  2,048  1,603  445  under 21.7% 4
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 143  143  0  7  7  0  - 0.0% 
Total Controllable Exp. 96,542  96,542  0  23,962  23,519  443  under 1.8% 
Total Controllable Inc. (90,830) (90,830) 0  (13,242) (12,799) (443) under
recovered (3.3%) 5, b
Net Controllable Exp. 5,712  5,712  0  10,720  10,720  0  - 0.0% 
Transfer to Reserves as
at (14/07/23) 0  0  0  0  0  0  -   
Position After Transfers
to Reserves (14/07/23) 5,712  5,712  0  10,720  10,720  0  - 0.0% 
Variance Explanations 
1. The variance relates to vacancies which are actively being recruited or are still under consideration whilst service requirements are determined.
2. The overspend relates primarily to service charges within the estates service.
3. The level of expenditure on materials varies depending on the current workload demands and timing of works on a wide variety of capital and revenue
works.
4. The use of private contractors varies depending on the current workload demands and timing of works on a wide variety of capital and revenue works.
5. The level of income recovered varies depending on the current workload and timing for the recovery of income on a wide variety of major capital and
revenue works. 
Budget Virements 
a. Transfer from Reserves for funding in relation to Office Accommodation Utilities. Net £0.413m: Property Costs £0.413m.
b. Realignment of budget within Estates services. Net £0.000m: Property Costs £0.166m and Income (£0.166m).
c. 2023/24 allocation from Community and Enterprise for Fuel Inflation. Net £0.042m: Transport & Plant £0.042m. 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Revenue Budget Monitoring 2023/2024 - Housing and
Technical Resources (Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 14 July 2023 for Housing and Technical
Resources (HRA)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements, be approved 
3. Background
3.1. This is the first revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 14 July 2023, there is a breakeven position against the phased budget. 
6. Other Implications
6.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through 4-weekly Budget Monitoring meetings at
which any variance is analysed.  In addition, the probable outturn exercise ensures
early warning for corrective action to be taken where appropriate. 
6.2. Inflationary and budget pressures this year increase the risk of overspend, however,
these pressures are assessed and managed within the budget planning exercise for
current and future years. 
6
29

Page 30

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
2 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 16 August 2023 
List of Background Papers
 Financial ledger and budget monitoring results to 14 July 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
E-mail :  Graham.Booth@southlanarkshire.gov.uk
30

Page 31

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 14 July 2023 (No.4) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance
Budget
Proportion
14/07/23
Actual
14/07/23
Variance
14/07/23 
%
Variance
14/07/23 Notes            
Budget Category            
Employee Costs 14,253  14,253  0  3,781  3,816  (35) over (0.9%) a
Property Costs 50,929  50,929  0  10,910  11,259  (349) over (3.2%) 1
Supplies & Services 433  433  0  159  177  (18) over (11.3%) 
Transport & Plant 196  196  0  45  49  (4) over (8.9%) 
Administration Costs 5,570  5,570  0  152  137  15  under 9.9% 
Payments to Other Bodies 2,974  2,974  0  634  661  (27) over (4.3%) 
Payments to Contractors 100  100  0  25  25  0  - 0.0% 
Transfer Payments 0  0  0  0  0  0  - 0.0% 
Financing Charges 27,162  27,162  0  5,904  5,904  0  - 0.0% 
Total Controllable Exp. 101,617  101,617  0  21,610  22,028  (418) over (1.9%) 
Total Controllable Inc. (115,940) (115,940) 0  (28,015) (28,113) 98  over
recovered 0.3% 2, a
Transfer to/(from) Balance
Sheet (4,907) (4,907) 0  (377) (697) 320  over
recovered 84.9% 3
Net Controllable Exp. (19,230) (19,230) 0  (6,782) (6,782) 0  - 0.0% 
Loan Charges 19,230  19,230  0  0  0  0  -   
Net Controllable Exp. 0  0  0  (6,782) (6,782) 0  - 0.0% 
Variance Explanations 
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor. There is also an
overspend in relation to cleaning charges.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.
3. The net combined overspend requires for a higher than budgeted level of transfer from reserves at this time. 
Virements 
a. Realignment of Housing Advice and Support Team Establishment Costs. Net £0.000m: Employee Costs (£0.396m), Income £0.396m. 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (Excl Housing Revenue Account (HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl HRA) for the period 1 April 2022 to 31 March 2023.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources (excl HRA) capital programme of  
£8.436 million and expenditure for the year of £4.883 million, be noted.
[1recs]
3. Background
3.1. This is the final capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023. 
3.2. As noted in the last report to this Committee (15 March 2023), the budget for
Housing and Technical Resources for financial year 2022/2023 was £8.436 million. 
There have been no changes to the budget allocation since that Committee meeting. 
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. 2022/2023 Capital Programme – Final Position
5.1. As detailed in Section 3.3, the capital programme for Housing and Technical
Resources for 2022/2023 was £8.436 million.  Total expenditure to 31 March 2023
was £4.883 million, a difference of £3.553 million on the programme of £8.436
million. 
5.2. The programme underspend of £3.553 million is mainly due to the timing of project
spend on a number of projects within multi-year programmes.  The main projects
which are responsible for the underspend are detailed in Appendix A for information.   
5.3. Any underspend on these projects, along with the funding, has been carried forward
into the new financial year as required.  An update on the 2023/2024 programme is
detailed in a separate report to this Committee.    
7
33

Page 34

5.4. Accounting Adjustments - while sections 5.1 to 5.3 detail the position on the Capital
Programme as set, Accounting Regulations mean that adjustments are required to
report spend correctly as either Capital or Revenue for the purposes of publishing
our Annual Accounts.  This includes where spend is in relation to assets that are not
owned by the Council and where the spend must be classed as Revenue.  There is
no operational impact for projects from this adjustment, it is an accounting entry only.   
5.5. At the year-end 2022/2023, £0.052 million of capital spend required to be recorded
as Revenue spend.  This transfer means that for the purpose of publishing our
Annual Accounts only, there is Capital spend of £4.831 million.   
6. Financial Implications
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment Management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
9 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 15 March 2023 
List of Background Papers
 Financial ledger to 31 March 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
34

Page 35

Appendix A
(Page 1) 
South Lanarkshire Council
Capital Expenditure 2022-2023
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2022 – 31 March 2023 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Anticipated
Spend
£000
Actual
Expenditure
£000 
Office Accommodation 7,758 138 0 7,896 7,896 4,601 
Private Housing Scheme of
Assistance 0 0 0 0 0 0 
Other Housing 367 173 0 540 540 282 
TOTAL 8,125 311 0 8,436 8,436 4,883 
Accounting Adjustments     
Less Transfers to Revenue      (52)  
Add Transfers to Capital      -  
2022/23 Outturn Position
(Accounting Basis Only)     
4,831 
35

Page 36

Appendix A
(Page 2) 
Main Projects with Underspends in 2022/2023 
Project Name
U/spend
Value
£000 
Project Name
U/spend
Value
£000
Prioritised Urgent Investment 2,319 Central Energy Efficiency Fund 279
Principal Offices 165 Civic Centre Fabric Upgrade 187
Lifecycle Replacement Schools 279 Community Facilities Fund 100
Lock Up Areas – Housing Estates 192 Council Offices – Brandon Gate  42 
36

Page 37

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing and
Technical Resources (Housing Revenue Account (HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April 2022 to 31 March 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources (HRA) capital programme
of £66.361 million and expenditure to 31 March 2023 of £60.695 million, be
noted 
3. Background
3.1. This is the fifth capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2022/2023.   
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 24 August 2022.   
3.3. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2022/2023 totals £66.361 million and is
detailed, along with the funding sources, at Appendix A to this report. 
5.2. The actual expenditure on the Housing programme was £60.695 million, a net
underspend of £5.666 million.  This is due to a number of factors, mainly, delays in
relation to the expected milestone payments for the Kirk Street, Strathaven new build
project and property services operatives being diverted to tackle the impact of bad
weather in December which resulted in flooding damage to a number of Council
properties.  In addition, environmental surveys on external fabric projects have
required work to be paused due to the suspected presence of bats which, in turn,
has delayed owner consultations.  There has also been reduced owner uptake for
external works.
8
37

Page 38

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through 4-weekly
Investment Management meetings. 
7.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact on the supply chain for the foreseeable future.  The impact will continue to be
monitored through the 4-weekly Investment Management meetings.  Further updates
will be reported in the coming months with any significant increases in contract
values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
29 June 2023 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, effective, efficient and transparent 
Previous References
▪ Executive Committee, 24 August 2022
▪ Executive Committee, 21 June 2023 
List of Background Papers
▪ Financial ledger to 31 March 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  Graham.Booth@southlanarkshire.gov.uk
38

Page 39

South Lanarkshire Council       Appendix A
Housing Capital Programme 2022/23
As at 31 March 2023 
£m £m
Anticipated Capital Expenditure 2022/23   66.361
Estimated Financing Position 2022/23   
Capital Receipts  7.311  
Capital Financed From Current Revenue 26.050  
Prudential Borrowing 26.462  
Specific Grant – Scottish Government New Council Houses 4.048  
Specific Grant – Scottish Government Buy Backs 2.370  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
66.361 
Actual Expenditure to 31 March 2023  60.695 
Actual Financing Position to 31 March 2023   
Capital Receipts  8.027  
Capital Financed From Current Revenue 26.050  
Prudential Borrowing 14.383  
Specific Grant – Scottish Government New Council Houses 7.820  
Specific Grant – Scottish Government Buy Backs 2.633  
Specific Grant – Scottish Government Mortgage to Rent 0.082  
Other Income 1.700        
60.695 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing and
Technical Resources (Excl Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl HRA) for the period 1 April to 14 July 2023.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources capital programme of £11.923
million and expenditure to date of £0.575 million, be noted
[1recs]
3. Background
3.1. This is the first capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2023/2024. Further reports will follow
throughout the year. 
3.2. The budget of £11.923 million for Housing and Technical Resources is based on the
overall Capital Programme for 2023/2024 approved by the Executive Committee on
21 June 2023. 
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2023/2024 Budget   
The total capital programme for Housing and Technical Resources is £11.923
million, as detailed in Section 3.2.  This budget is based on the original programme
of projects approved by the Council in February 2023, updated to include budget
carried forward from financial year 2022/2023 and a budget amendment for £0.124
million.  This budget amendment was approved by Executive Committee in June
2023 (detailed in Appendix A).  The budget of £11.923 million also reflects the
estimated level of spend which can be achieved in 2023/2024, based on current
information.    
9
41

Page 42

5.2. Period 4 Position 
The anticipated spend to date was £0.560 million and spend to 14 July 2023
amounts to £0.575 million, an overspend of £0.015 million.  This is a timing issue
only. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through 4-weekly Investment Management meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
9 August 2023 
Link(s) to Council Values/Ambitions/Objectives
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council, 22 February 2023
 Executive Committee, 21 June 2023 
List of Background Papers
▪ Financial ledger to 19 May 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
42

Page 43

Appendix A 
South Lanarkshire Council
Capital Expenditure 2023-24
Housing and Technical Resources Programme (excl HRA)
For Period 1 April 2023 – 14 July 2023 
Housing and Technical 
Resources (excl HRA)
Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000
Asset Management
Programmes 10,636 124 0 10,760  540 563
Private Housing Scheme of
Assistance 1,000 0 0 1,000  0 0
Other Housing 163 0 0 163  20 12
TOTAL 11,799 124 0 11,923  560 575 
For Information Only  
Budget Adjustments approved by Executive Committee, 21 June 2023: 
Budget Adjustments 
Prioritised Urgent Investment - Priory Changing Pavilion, Blantyre 
Total Budget Adjustments             
£0.124m 
£0.124m   
43

Page 44

44

Page 45

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing and
Technical Resources – (Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April to 14 July 2023.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Housing and Technical Resources (HRA) capital programme
of £69.596 million and expenditure to 14 July 2023 of £12.469 million, be
noted 
3. Background
3.1. This is the first capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2023/2024.   
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 16 August 2023.   
3.3. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. The Housing Capital Programme for 2023/2024 totals £69.596 million and is detailed
along with the funding sources at Appendix A to this report. 
5.2. The Resource is expecting to spend to this level, work will continue in the coming
months to monitor achievable spend. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10
45

Page 46

7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through 4-weekly
Investment Management meetings. 
7.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact on the supply chain for the foreseeable future.  The impact will continue to be
monitored through the 4-weekly Investment Management meetings.  Further updates
will be reported in the coming months with any significant increases in contract
values being brought to members’ attention. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
2 August 2023 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, effective, efficient and transparent 
Previous References
▪ Executive Committee, 16 August 2023 
List of Background Papers
▪ Financial ledger to 14 July 2023. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Resources)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
46

Page 47

South Lanarkshire Council       Appendix A
Housing Capital Programme 2023/24
As at 14 July 2023 
£m £m
Anticipated Capital Expenditure 2023/24   69.596
Estimated Financing Position 2023/24   
Capital Receipts  1.683  
Capital Financed From Current Revenue 27.162  
Prudential Borrowing 23.331  
Specific Grant – Scottish Government New Council Houses 12.036  
Specific Grant – Scottish Government Buy Backs 5.264  
Specific Grant – Scottish Government Mortgage to Rent 0.120  
Other Income 0.000        
69.596 
Actual Expenditure to 14 July 2023  12.469 
Actual Financing Position to 14 July 2023   
Capital Receipts  1.688  
Capital Financed From Current Revenue 5.902  
Prudential Borrowing 0.000  
Specific Grant – Scottish Government New Council Houses 4.748  
Specific Grant – Scottish Government Buy Backs 0.000  
Specific Grant – Scottish Government Mortgage to Rent 0.131  
Other Income 0.000        
12.469 
47

Page 48

48

Page 49

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Housing and Technical
Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – April to June 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for April to June 2023 relating to Housing and
Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for April to June 2023 relating to
Housing and Technical Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Housing and
Technical Resources provides information on the position for April to June 2023. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of June 2023 for Housing
and Technical Resources. 
The Resource absence figure for June 2023 was 6.0%, this figure has increased by
0.6% when compared to last month and is 1.3% higher than the Council-wide figure. 
Compared to June 2022, the Resource absence figure has decreased by 0.4%. 
Based on the absence figures at June 2023 and annual trends, the projected annual
average absence for the Resource for 2023/2024 is 5.7% compared to a Council-
wide average figure of 5.6%. 
11
49

Page 50

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services works in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall 160 referrals were made this period.  This represents a
decrease of 16 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 7 accidents/incidents recorded within the Resource this period, a
decrease of 1 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 3 disciplinary hearings were held within the Resource, this figure
has increased by 3 when compared to the same period last year.  During this period
no appeals were heard by the Appeals Panel.  No grievances were raised within the
Resource, this figure has decreased by 1 when compared to the same period last
year.  No Dignity at Work complaints were raised within the Resource, this figure
remains unchanged when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 5 leavers in the Resource this period eligible for an exit
interview.  This figure has decreased by 4 when compared with the same period last
year.  Three exit interviews were conducted in this period, a decrease of 1 when
compared with the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period April to June 2023, 26 employees (20.23
FTE) in total left employment, managers indicated that 25 posts (19.83 FTE) were
being replaced and 1 post (0.40 FTE) was due to the end of fixed term contract. 
5. Employee Implications
5.1. There are no implications for employees arising from the information presented in
this report. 
6. Financial Implications
6.1. All financial implications are accommodated within existing budgets. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
50

Page 51

8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
26 July 2023 
Link(s) to Council Values/Ambitions/Objectives
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Housing and Technical Resources – 31 May 2023 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
51

Page 52

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 3.2 5.5 5.7 April 3.6 10.6 6.9 April 3.3 7.6 6.2 April 4.3 5.6 5.1
May 2.9 4.5 4.9 May 4.2 8.1 6.1 May 3.4 6.0 5.4 May 4.9 5.4 5.1
June 3.5 4.9 5.4 June 6.2 8.5 6.8 June 4.6 6.4 6.0 June 4.7 5.3 4.7
July 4.0 5.5 July 5.7 8.9 July 4.7 6.9 July 4.0 4.6
August 4.9 4.7 August 7.9 7.1 August 6.2 5.7 August 4.7 4.4
September 5.8 4.5 September 8.1 6.3 September 6.8 5.2 September 6.4 5.4
October 5.2 4.3 October 9.0 7.8 October 6.8 5.8 October 6.3 5.8
November 5.7 4.6 November 9.2 7.8 November 7.2 5.9 November 6.9 6.5
December 4.6 4.4 December 9.5 7.2 December 6.7 5.6 December 6.9 7.0
January 5.2 4.5 January 8.8 5.5 January 6.7 4.9 January 7.0 5.8
February 6.4 4.4 February 8.5 6.2 February 7.3 5.1 February 6.6 5.9
March 7.8 5.3 March 10.7 6.8 March 9.0 5.9 March 7.9 6.4
Annual Average 4.9 4.8 4.9 Annual Average 7.6 7.6 7.0 Annual Average 6.1 5.9 5.7 Annual Average 5.9 5.7 5.6
Average Apr-Jun 3.2 5.0 5.3 Average Apr-Jun 4.7 9.1 6.6 Average Apr-Jun 3.8 6.7 5.9 Average Apr-Jun 4.6 5.4 5.0
875 560 1435 16208
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
APT&C Manual Workers Council Wide
No of Employees at 30 June 2023No of Employees at 30 June 2023 No of Employees at 30 June 2023 No of Employees at 30 June 2023
52

Page 53

HOUSING AND TECHNICAL RESOURCES
Apr - Jun Apr - Jun
2022 2023
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 38 44
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 1
TOTAL 176 160
Apr - Jun Apr - Jun
2022 2023
Over 7 day absences 4 1
Minor 1 4
Violent Incident:  Verbal***** 3 2
Total Accidents/Incidents 8 7
Apr - Jun Apr - Jun
2022 2023
Total Number of Hearings 0 3
Time Taken to Convene Hearing April - June 2023
0-3 Weeks 4-6 Weeks Over 6 Weeks
2 1 0
Apr - Jun Apr - Jun
2022 2023
Number of Grievances 1 0
Number Resolved at Stage 1 1 0
Apr - Jun Apr - Jun
2022 2023
Number of Incidents 0 0
Apr - Jun Apr - Jun
2022 2023
Career Advancement 1 0
Personal Reasons 0 1
Travelling Difficulties 1 1
Childcare/caring responsibilities 1 0
Dissatisfaction With Terms and Conditions 1 1
Number of Exit Interviews conducted 4 3
Total Number of Leavers Eligible for Exit Interview 9 5
Percentage of interviews conducted 44% 60%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
46
APPENDIX 2
58 51
14 18
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
66
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
53

Page 54

FTE H/C FTE H/C
Terminations/Leavers 20.23 26 20.23 26
Being replaced 19.83 25 19.83 25
Filling on a temporary basis 0.00 0 0.00 0
Plan to transfer this budget to another post 0.00 0 0.00 0
End of fixed term contract 0.40 1 0.40 1
Held pending service Review 0.00 0 0.00 0
Plan to remove for savings 0.00 0 0.00 0
Appendix 2a
Reason Apr - Jun 2023 Cumulative total
54

Page 55

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resource Plan Quarter 4
Progress Report 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
• provide the Housing and Technical Resource Plan Quarter 4 Progress Report
2022/2023, for the period 1 April 2022 to 31 March 2023 
2. Recommendations
2.1. The Committee is asked to note the following recommendation(s):- 
(1) that the Housing and Technical Resource Plan Quarter 4 Progress Report
2022/2023, as summarised in paragraph 5.2 and attached as Appendix 2 of
this report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3 of this report, be noted; 
(3) that the areas for improvement and associated management actions, as
detailed in paragraph 5.4 of this report, be noted; and
(4) that the additional scrutiny of changes in measure status between Quarter 2
and Quarter 4, as summarised at paragraph 5.5 and detailed at Appendix 3 of
this report, be noted 
3. Background
3.1. The Housing and Technical Resource Plan 2022/2023 was approved by the
Executive Committee on 24 August 2022 and noted by this Committee on 5 October
2022 and sets out the outcomes, measures and actions to be managed and
delivered by the Resource in the financial year 2022/2023.   
3.2. The Resource Plan follows the agreed corporate structure and style.  The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022-27.  
3.3. As elected members are aware, from March 2020 onwards, at times, the Council
was forced to suspend or reduce a number of services that could not be continued in
full due to the Covid-19 pandemic.  The Council was also obliged to redirect
resources so that it could deliver vital new services and supports for individuals,
communities and businesses.  Despite the return of services through the Council’s
Recovery Plan, there is a Covid-19 legacy in terms of a residual impact on some
services and a significant build-up of demand, as a result of which there remains an
inevitable impact on performance in some areas. 
12
55

Page 56

4. Resource Outcomes 2022/2023
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2022/2023.  These are detailed at Appendix 1. 
5. Quarter 4 Progress Report 2022/2023
5.1. Progress against all Resource Plan measures is contained in the Quarter 4 Progress
Report 2022/2023, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe and uses a traffic
light format with the following definitions to give a status report on each measure:-  
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when
available
Contextual Included for ‘information only,’ to set performance information in
context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4 of this
report.  To ensure adequate scrutiny of performance across all Resources, the
Council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or
‘amber’ measures at a future meeting. 
The overall summary of progress to date is as follows and performance should be
considered in the context of the impact of responding to Covid-19:- 
Status Measures
Statistical  Project  Total %
Blue  3 3 4%
Green  24 30 54 75%
Amber  3 2 5 7%
Red     2 2 4 6%
Report later/Contextual 6 0 6 8%
Totals  35 37 72 100%   
(Data correct as at 2 August 2023) 
5.3. Key achievements for 2022/2023, to date, are noted below:- 
Connect Outcome Health and Wellbeing 
Resource
Outcome
Achievement
Support people to
live active and
independent lives
Approval of applications for adaptations were, on average,
completed in 21.72 days against a target of 28 days.
90.1% of standard adaptations to council houses were
complete within agreed appointment times against target of
90%.
All demand has been met for adaptations to council
housing.  There is no waiting list for adaptations to council
housing.
56

Page 57

Connect Outcome Housing and Land 
Resource
Outcome
Achievement
Support people to
access and sustain
housing which
meets their needs
through our
Integrated Housing
Options service
92% of new tenancies sustained for more than a year
against target of 88%.
Development and
implement Local
Housing Strategy
for 2022-27
The Local Housing Strategy 2022-27 was approved by
Executive Committee on 30 November 2022.  The first
Annual Review will be presented to Executive Committee in
June 2024, with a mid-year update provided to Resource
Management Team in October 2023.
Ensure our repairs
service continues
to meet the needs
of customers
Emergency repairs were, on average, completed in 5 hours
36 minutes against a target of 24 hours.
Non-emergency repairs were, on average, completed in
11.63 days against a target of 28 days.
99.6% of reactive repairs were completed right first time.
Continue to deliver
an affordable
housing
programme to
meet needs
A total of 176 new build homes have been delivered during
2022/2023 by the council, with a further 57 acquired through
the Council’s Market Purchase scheme. 
In addition to working towards these Outcomes, we recognise that the Council will
continually aim to improve and ensure effective and efficient use of resources and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource Outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and Achieving Best Value
Resource
Outcome
Achievement 
Delivering the plan
and achieving best
value
Stage 1 complaints were fully responded to on an average
of 5 working days, against a target timescale of 5 working
days (SSHC).
Stage 2 complaints were fully responded to on an average
of 15 working days, against a target timescale of 20 working
days (SSHC).
1.41% of rent was lost due to properties being void (SSHC)
against the target of 1.42%.
99.1% rent collected as a % of rent due in the year against
target of 98.8% (SSHC). 
5.4. Areas for Improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why and the
management action now being taken, where applicable. 
57

Page 58

Connect Outcome:   Housing and Land
Resource Outcome: Ensure our repairs service continues to meet the needs of
customers
Measure  Comments/Progress Action by Manager 
(where applicable)
No of times we did
not, meet our
obligation to
complete the annual
gas safety check by
annual anniversary
date
As at the end of the reporting year,
there were 20 annual gas safety
checks which were not complete
by their required date. 
Of the 20 out of date, 19
properties were complete
by year end, with the
remaining property
currently an active crime
scene with access
prohibited.
Resource Outcome:   More energy efficient homes 
% of Council stock
meeting the SHQS
80% of Council stock meeting the
SHQS (% of dwellings meeting
SHQS) against a target of 90.9%.
The changes to the Fire
Tolerable standard have
continued to impact on
the SHQS.  
In relation to the reporting
requirements for  Fire
Tolerable Standards and 
Fixed Electrical Testing, a
robust programme of
work is in place to
address these issues,
including  the appropriate
use of  forced entry.
Resource Outcome:   Provide a comprehensive range of services to help
prevent and alleviate homelessness including the
provision of suitable and temporary and supported
accommodation
During 2022/2023,
reduce the overall
homelessness
caseload from 900
to 850 and reduce
long term
homelessness
caseload by 10%
The operating context in relation to
homelessness has proven to be
extremely challenging in the year.
The prevailing socio-economic
conditions adversely impacted
upon the ability to achieve this
target 2022/2023. This trend has
been mirrored nationally
This is a key focus for the
Resource and continues
to be closely monitored
by management. 
Delivering the Plan and Achieving Best Value
Resource Outcome:   Digital and ICT services meet the needs of the council and
its customers
Measure  Comments/Progress Action by Manager 
(where applicable)
Continue with
phased
implementation of
new IT system
Following formal engagement with
the supplier it was established that
they were unable to deliver the
agreed requirements.
The Council acted to
terminate the contract. 
A new supplier has now
been appointed with a
revised project plan in
place. 
58

Page 59

5.5. Scrutiny of Change in Measure Status 
A further analysis introduced to aid scrutiny of performance, is to highlight and
explain all measures that have changed status from Quarter 2 to Quarter 4.  On
analysis of these, 5 measures recorded a decline in performance.  Details of these 5
measures are included at Appendix 3.  The remaining measures under scrutiny
changed to Green (timescale or target met) or Blue (complete) and need no further
action. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The Outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and longer term, within the framework of the
Council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2023/2024. 
9.  Other Implications
9.1. There are no other implications as a result of this report. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
9 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022-27 
Previous References
 Housing and Technical Resource Plan Quarter 4 Progress Report 2021/2022 - noted by
Housing and Technical Resources Committee on 5 October 2022 
59

Page 60

List of Background Papers
 Council Plan Connect 2022-27 – approved by the full Council on 15 June 2022
 Housing and Technical Resource Plan 2022/2023 – approved by Housing and Technical
Resources Committee on 5 October 2022
 Housing and Technical Resource Plan 2022/2023 - approved by the Executive
Committee on 24 August 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lynn Hayes (Performance and Support Advisor)
Ext:  4823 (Tel:  01698 454823)
E-mail:  lynn.hayes@southlanarkshire.gov.uk
60

Page 61

Appendix 1 
Housing and Technical Resource Outcomes 2022/2023  
Connect Outcomes Resource Outcomes
Communities and
Environment
• Work with communities to create safe, strong sustainable
places
Health and Wellbeing • Support people to live active and independent lives
• Help people to continue to live within their homes and
communities through integrated community health and social
care services
Children and Young
People
• Improve the health and wellbeing of children, young people
and families
Housing and Land • Support people to access and sustain housing which meets
their needs through our Integrated Housing Options service
• Provide a comprehensive range of services to help prevent
and alleviate homelessness including the provision of suitable
temporary and supported accommodation
• Continue to deliver an affordable housing programme to meet
needs
• Manage the council’s portfolio of properties and land
• Ensure our repairs service continues to meet the needs of
customers
• More energy efficient council homes
• Continue to engage and work with tenants and other
customers to design our services
• Provide high quality services to our service to our tenants,
including those who live in sheltered housing and residents at
our Gypsy / Travellers sites 
Delivering the Plan and
achieving Best Value
Resource Outcomes
• Digital and ICT services meet the needs of its customer 
• Customers experience high quality and improving council
services
• The council demonstrates high standards of governance and
sound financial stewardship
• The workforce has the skills, flexibility and capacity to deliver
the Council’s Outcomes 
61

Page 62

62

Page 63

IMPROVe - SLC Performance Management System Report printed on 2 Aug 15:37
Quarter 4 : April 2022 - March 2023
Housing and Technical Resources
Housing and Technical
Resource Plan Scorecard
(This represents the cumulative position to March 2023)
Performance Report 2022-23
12
63

Page 64

IMPROVe - SLC Performance Management System Report printed on 2 Aug 15:37
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 1 0 0 0 1
Education and Learning 0 0 0 0 0
Health and Wellbeing 4 0 0 2 6
Children and Young People 0 0 0 0 0
Housing and Land 13 2 2 2 19
Our Economy 0 0 0 0 0
Delivering the plan and achieving best value 6 1 0 2 9
Total 24 3 2 6 35
64

Page 65

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
Communities and Environment
Work with communities to create safe, strong sustainable places
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of Anti-Social Behaviour cases resolved
in the year (SSHC)
Target achieved. Green 90.00% 96.80% 98.00% 95.21% 94.30%
Health and Wellbeing
Support people to live active and independent lives
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of adaptations completed in
Council homes
1266 adaptations completed in Council Homes. Contextual ------ 1,266 848 476 993
No of households currently waiting for
adaptations to their home
Target achieved. Green 0 0 0 0 0
% of approved applications for adaptations
completed in year (SSHC)
All adaptations were approved, this measure is demand led. Green 100.00% 100.00% 100.00% 100.00% 100.00%
Average time (working days) to complete
applications (SSHC)
Target achieved. Green 28.00
days
21.72
days
24.82 days 28.00 days 23.49 days
% of standard adaptations to council
houses within agreed appointment times
Target achieved. Green 90.0% 90.1% 85.6% 92.4% 98.3%
% of new build that meets needs of older
people
Of the 176 new build units delivered by the council within 2022/23, 27%
of these are designed to meet the needs of older people.
Contextual ------ 27.0% ------ ------ 20.0%
Housing and Land
Support people to access and sustain housing which meets their needs through our Integrated Housing Options service
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of lets to Urgent housing (UH) need
households
Target achieved. Green 55.0% 58.1% 51.4% 61.1% 53.5%
% of new tenancies sustained for more
than a year  for all lets (SSHC)
Tenancy sustainment has remained strong in year, significantly above
target.
Green 88.00% 92.00% 90.08% 91.90% 93.40%
% of tenancy offers refused during the year
(SSHC)
Refusals are driven by the applicant and can vary significantly
depending on size/availability/location of housing.
Contextual ------ 23.4% 30.8% 24.7% 16.6%
65

Page 66

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
Housing and Land
Support people to access and sustain housing which meets their needs through our Integrated Housing Options service
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Average time taken to relet empty
properties (SSHC)
Slightly above target at year end. This continues to be a key focus for
the Resource with a Voids Working Group established to closely monitor
and identify improvement actions.  Continue to perform well in
comparison to peers.
Amber 26.00
days
27.76
days
21.70 days 21.00 days 21.50 days
Provide a comprehensive range of services to help prevent and alleviate homelessness including the provision of sustainable temporary and supportedaccommodation
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of homeless households advised of
outcome of assessment within 28 days
Slight drop in performance due to new service arrangements
implemented  in first half of year. Performance returned to previously
high levels second half of year.  This is a locally set target and is a key
focus for the Resource and continues to be closely monitored by
management.
Green 95.0% 95.2% 99.8% 99.8% 99.6%
Average length of time in temporary
accommodation
Target achieved. Green 120 days 96 days 102 days 121 days 105 days
% of households provided with temporary
accommodation (SG)
Target achieved. Green 100.0% 100.0% 100.0% 100.0% 100.0%
% of temporary accommodation on offers
refused
Target achieved. Green 6.00% 6.00% 6.24% 6.84% 7.42%
Number of times we did not meet our
obligation to provide suitable
accommodation (SG)
Target achieved. Green 0 0 ------ 0 0
% of Housing Options interventions where
Homelessness prevented
The operating context in relation to the prevention of homelessness has
proven to be extremely challenging in the year. The prevailing
socio-economic conditions adversely impacted upon the ability to
prevent homelessness during 2022/23.  This trend has been mirrored
nationally.
Amber 70.0% 65.9% ------ ------ 73.5%
Ensure our repairs service continues to meet the needs of customers
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of response repairs completed on time Target achieved. Green 90.0% 95.3% 96.0% 97.7% 99.1%
66

Page 67

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
Housing and Land
Ensure our repairs service continues to meet the needs of customers
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Ave length of time to complete emergency
repair - hours (SSHC) - YTD
Although target has been achieved, there has been an increase on the
time taken to complete emergency repairs due to storm damage in
December 2022.
Green 24.00
hours
5.36
hours
3.44 hours 3.26 hours 4.24 hours
Ave length of time to complete non
emergency repair (SSHC) (LGBF) - YTD
Target achieved. Green 28.00
days
11.63
days
14.19 days 13.07 days 11.76 days
% of reactive repairs completed first time
right (SSHC)
Target achieved. Green 90.00% 99.60% 99.91% 99.95% 99.00%
% of repairs appointments kept Target achieved. Green 90.00% 94.00% 94.00% 94.18% 94.00%
No of times we did not, meet our obligation
to complete the annual gas safety check by
annual anniversary date
Of the 20 out of date, 19 properties were complete by year end, with the
remaining property currently an active crime scene with access
prohibited.
Red 0 20 7 411 1
% of tenant satisfaction with repairs or
maintenance in year (SSHC)
Slight drop in performance due to the impact of severe weather. Green 90.0% 89.0% 93.0% 90.0% 91.0%
More energy efficient council homes
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of Council stock meeting the SHQS The changes to the Fire Tolerable standard have continued to impact on
the SHQS.
In relation to the reporting requirements for  Fire Tolerable Standards
and  Fixed Electrical Testing, a robust programme of work is in place to
address these issues, including  the appropriate use of  forced entry.
Red 90.9% 80.0% 93.2% 93.5% 72.3%
% of council dwellings that are Energy
Efficiency Standard for Social Housing 2
(EESSH2)
The 2025 and 2032 EESSH Milestones have been suspended as the
Scottish Government are reviewing the EESSH2 standards to
strengthen and realign the standard with the target for net zero heat in
houses from 2040.
Report Later ------ ------ 93.39% 93.88% 98.64%
Delivering the plan and achieving best value
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of Stage 1 complaints responded to in
full (SSHC)
133 out of 140 stage 1 complaints responded to in full. Contextual ------ 95.00% 97.44% 93.00% 91.00%
67

Page 68

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard Performance Indicators Housing and Technical Resources - Housing and Technical
Delivering the plan and achieving best value
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Average time in working days for a full
response at Stage 1
Target achieved. Green 5 5 4 5 5
% of Stage 2 complaints responded to in
full (SSHC)
29 out of 33 stage 2 complaints responded to in full. Complaints
continue to be a focus for management and are routinely monitored. As
a result, the numbers remain consistently low, which in turn can have an
detrimental impact on the overall percentage.
Contextual ------ 88.00% 96.77% 91.00% 100.00%
Average time in working days for a full
response at Stage 2
Target achieved. Green 20 15 17 14 15
Rent collected as a % of rent due in the
year (SSHC)
Target achieved. Green 98.8% 99.1% 99.7% 97.4% 98.3%
Gross rent arrears (current and former
tenants) as a % of rent due for the year
(LGBF) (SSHC)
Target achieved. Green 9.00% 8.66% 7.05% 8.26% 8.91%
% of rent due in the year that was lost due
to voids (Operational void rent loss)
(SSHC)
Performance continues to be routinely monitored with a number of
improvement actions identified.
Green 0.60% 0.62% 0.49% 0.42% 0.60%
% of total void rent loss (SSHC) Target achieved. Green 1.42% 1.41% 1.35% 1.22% 1.53%
Factoring collection rate Despite increased revenue collection of £200k, factoring collection fell
£73k short of the annual target.  This was largely attributable to a £55k
increase in service charges and rechargeable repairs.  It is also
considered that the cost of living crisis led to factoring bills being viewed
as a lesser priority debt by owners.
Amber 75.00% 72.20% 78.10% 74.06% 73.00%
68

Page 69

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 0 1 0 0 0 1
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 1 0 0 0 1
Children and Young People 0 6 0 0 0 6
Housing and Land 3 21 2 1 0 27
Our Economy 0 0 0 0 0 0
Delivering the plan and achieving best value 0 1 0 1 0 2
Total 3 30 2 2 0 37
69

Page 70

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Communities and Environment
Work with communities to create safe, strong sustainable places
Action Measures Comments/ Progress Status
Community Safety
priorities including
relevant parts of the
SLCP are achieved
The Resource will administer a review of the safer South
Lanarkshire Board and associated structure during 2022/23.
This will aim to ensure reporting requirements around police
and fire scrutiny, anti-social behaviour and community justice
remain appropriate alongside links to revised community
planning priorities
The report on the outcomes of the review of the Safer South
Lanarkshire Board, including a revised terms of reference, was
approved by the Board in March 2023, and was approved by Executive
Committee May 2023.
Green
Health and Wellbeing
Help people to continue to live within their homes and communities through integrated community health and social care services
Action Measures Comments/ Progress Status
Ensure effective
contribution to health
and social care
outcomes contained
within the Strategic
Commissioning Plan
Implementation of agreed housing actions within SCP3 to be
progressed throughout the duration of the SCP3
Work continues to implement the two strategic intentions relating to
housing and homelessness, with particular focus being placed on work
to support implementation of forthcoming homelessness prevention
duties.
Green
70

Page 71

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Children and Young People
Improve the health and wellbeing of children, young people and families
Action Measures Comments/ Progress Status
Contribute to effective
joint working to protect
100% of households identified as at risk are referred to
appropriate statutory agencies
Process in place and staff fully briefed with process. Green
and promote the
wellbeing of children,
young people and adults
Reducing the costs of housing families including energy
costs - a key action as detailed in the Local Child Poverty
Action Report
South Lanarkshire continues to perform well in relation to housing
affordability with council rent approximately 5% lower than the Scottish
average.
The council successfully worked in conjunction with tenants to set rent
levels for 2023-24 with an increase of approved 3.5% that took
account of the cost-of-living crisis and to support continuing to invest in
housing stock and provide high quality services.
Green
Investment to increase new affordable housing supply - a
key action as detailed in the Local Child Poverty Action
Report
During 2022/23 176 additional new build homes for social rent were
delivered by the council and 57 homes were secured through the
council’s Open Market Purchase Scheme.
Green
Preventing and reducing homelessness for households,
including families with children and young people - a key
action as detailed in the Local Child Poverty Action Report
We provided financial support to 696 homeless households through
the Tenancy Sustainment Fund (TSF) in 2022/23.
Green
Implement the SHORE (Sustainable Housing on Release for
Everyone) standards, by providing appropriate support to
80% of individuals leaving prison with identified housing
need
The SHORE Standards are fully implemented with the role expanded
to include admissions as well as representation at the womens unit in
Glasgow.
Green
100% of young people moving on from care offered housing
options appointment, and of those requiring Housing Service
assistance, 100% supported to move onto suitable and
sustainable housing via a personal housing pathway plan
100% of care leavers were offered a housing options appointment. At
March 2023, 36 out of 37 (98%) young care leavers with live housing
applications had completed a housing pathway plan.
Green
Housing and Land
Support people to access and sustain housing which meets their needs through our Integrated Housing Option Service
Action Measures Comments/ Progress Status
Understand the financial
security of our
customers
Provide a programme of support to our customers including -
The offer of tailored support to 100% of tenants who go on to
receive Universal Credit
Continue to make contact with all Council tenants who claim Universal
Credit to provide them with advice and support including referrals and
signposting to other Council services or external agencies.
Green
71

Page 72

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Housing and Land
Support people to access and sustain housing which meets their needs through our Integrated Housing Option Service
Action Measures Comments/ Progress Status
Provide a programme of support to our customers including -
Tenancy Sustainment Fund
We provided financial support to 696 homeless households through
the Tenancy Sustainment Fund (TSF) in 2022/23.
Green
As part of rent settling process complete analysis of the
affordability of our rents by December 2022
Rent affordability tool updated with SLC rent information and
discussed at meetings of the Tenant Participation Co-ordination Group
and Budget Scrutiny Group.  SLC has 8th lowest average local
authority rent in Scotland.
Green
Consult with tenants regarding proposed rent levels by
December 2022
Rent consultation programme co-developed and delivered with Tenant
Participation Co-ordination Group and Budget Scrutiny Group and
closed on 19th January 2023. Focus of consultation was investment
priorities. Details of the consultation including views received was
included in the Housing Revenue and Capital Account Budget Report
presented to Housing and Technical Resources Committee on 23
January 2023.
Green
Development and
implement Local
Local Housing Strategy developed, consulted and approved
by Executive Committee November 2022
The Local Housing Strategy 2022-27 was approved by Executive
Committee on 30th November 2022.
Complete
Housing Strategy for
2022-2027
A Housing Needs and Demand Assessment completed by
August 2022
Housing Needs and Demand Assessment 3 has been published,
setting out a broad, long-term estimate of the number of additional
units that may be required to meet existing and future housing
demand.  The Local Housing Strategy 2022-27 was informed by the
projections contained in the HNDA.
Complete
Provide a comprehensive range of services to help prevent and alleviate homelessness including the provision of suitable and temporary and
supported accommodation
Action Measures Comments/ Progress Status
Improve access to
settled accommodation
for homeless
Rapid Rehousing Transition Plan delivered Five key priorities continue to be the focus of the plan with 91% of
indicators either on target or anticipated to meet the target by the
conclusion of the plan.
Green
households Implement Housing First approach, provide suitable
accommodation and support for up to 40 individuals with
complex needs by 2022/23
36 households have now engaged with the Housing First Journey
which provides suitable accommodation and support for individuals
with complex needs.
Green
72

Page 73

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Housing and Land
Provide a comprehensive range of services to help prevent and alleviate homelessness including the provision of suitable and temporary and
supported accommodation
Action Measures Comments/ Progress Status
Increase settled accommodation by converting 20 to 30
temporary accommodation units to Scottish Secure
Tenancies during 2022/23
30 temporary accommodation units have been flipped through
2022/23.  Local offices continue to utilise this process when a
household is settled and choose to remain in their temporary home.
Green
We will continue to make progress towards our target of
converting up to 100 temporary accommodation units to
Scottish Secure tenancies by 2024
This indicator has been met with a total of 105 temporary
accommodation units converted to Scottish Secure Tenancies.
Green
During 2022/23, reduce the overall homelessness caseload
from 900 to 850 and reduce long term homelessness
caseload by 10%
The operating context in relation to homelessness has proven to be
extremely challenging in the year. The prevailing socio-economic
conditions adversely impacted upon the ability to achieve this target
2022/23.  This trend has been mirrored nationally.
Red
Reduce and maintain repeat instances of homelessness to
below 4.5% of all cases during 2022/23 (RRTP aim is <3%
over life of plan)
Repeat homelessness was reported at 3.6% for 2022/23. Green
Continue to deliver an affordable housing programme to meet needs
Action Measures Comments/ Progress Status
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP
and reported to Housing and Technical Resources
Committee
The council have completed delivery of 176 new build homes across
the South Lanarkshire area during 2022/23, with a further 57 acquired
through the council's Market Purchase scheme. No figures have been
published for partner RSL's yet with the information collated and held
by the Scottish Government.
Green
Physical regeneration
work in priority areas
Remaining properties (Phase 3 of the masterplan) for
regeneration at Whitlawburn complete by end of March 2023
Handover of the final SLC properties at East Whitlawburn was
completed. Work on West Whitlawburn Housing Co-operative is
ongoing and will be completed in quarter 1 2023/24.
Green
73

Page 74

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Housing and Land
Continue to deliver an affordable housing programme to meet needs
Action Measures Comments/ Progress Status
Work with partners to bring 15 Long Term empty homes into
use by March 2023
Through working with partners, including the Scottish Empty Homes
Partnership and the council's Finance and Corporate Resources, the
Resource has successfully worked with owners to assist in bringing
back 15 empty properties into use during 2022/23.
Green
Increase supply of
housing suitable for
older people
All properties that are suitable, as identified at the void stage,
will be converted to Amenity standard
At quarter 4 there have been 7 mainstream properties brought up to
the current amenity standard.  We will continue to upgrade the void
properties already identified suitable for amenity housing.
The amenity upgrade programme commenced in 2012/13 and 629
homes have been upgraded to the new amenity standard.
Green
During the period of the SHIP 2022-2027, a total of 569
specialist provision properties are forecast to be delivered
across both SLC and RSL sites
47 amenity standard or accessible properties have been delivered by
the council during 2022/23. No figures have been published for RSL's
yet with the information collated and held by the Scottish Government.
Green
Manage the council's portfolio of properties and land
Action Measures Comments/ Progress Status
Project Management of
Schools Projects and
General Services
Projects
The General Services Programme spend will be achieved for
the financial year
Spend to quarter 4 £65.736m.  Revised Estimated Expenditure
£78.396m.  Outturns were impacted by the continued issue of securing
supplies and labour at the right time due to issues caused by the
Pandemic, Brexit and War in Ukraine.
Amber
Two new nursery projects - Skylark, Larkhall to be completed
in 2022/23 and Clyde Terrace, Bothwell commencing with
completion date August 2023
Skylark is complete.  Clyde Terrace, Bothwell has been delayed by
utilities and will not now complete until November 2023.
Green
74

Page 75

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Housing and Land
More energy efficient council homes
Action Measures Comments/ Progress Status
Improve energy
efficiency stock to help
address fuel poverty
Deliver investment projects to increase energy efficiency of
housing stock during 2022/23
As reported to the council’s Executive Committee as part of the Capital
Programme Monitoring reports throughout 2022/23, the Housing
Investment Programme has been subject to delays due to a variety of
reasons which includes staff resources being diverted from energy
efficiency works to tackle urgent repairs stemming from the extreme
weather in December 2022.
The council has been working throughout 2022/23 to prepare for the
launch of the next phase of the Energy Company Obligation scheme
(ECO4).  This scheme is funded from energy companies and
administered nationally by Ofgem aiming to provide a pathway for
households that are fuel poor or on low incomes and vulnerable to the
effects of cold, to access financial assistance to improve the energy
efficiency of their homes.  Preparatory work is now complete and the
scheme is scheduled to be launched.
In relation to the second phase of the Energy Efficiency Standards for
Social Housing (EESSH2), the Scottish Government are currently
reviewing the standards and the council await further detail prior to
commencing performance reporting against new or revised measures.
Amber
Continue to engage and work with tenants and other customers to design our services
Action Measures Comments/ Progress Status
Develop and implement
Customer Involvement
Strategy
Customer Involvement Strategy to be developed, consulted,
and approved by Housing and Technical Resources
Committee by June 2023
The Customer Involvement Strategy 2023-28 will be developed and
consulted on during 2023/24 before being submitted for approval to
Housing and Technical Resources Committee in February 2024.
Green
Ensure effective
involvement with tenants
and other customer
groups
Annual Scrutiny Programme 2022/23 developed August
2022 and implemented by March 2023
A gas servicing and tenant safety scrutiny exercise concluded in
March, with a report on findings received from the Customer Scrutiny
Group.  The recommendations from the report will be reviewed by the
Resource and opportunity required to the further development of
service.
Green
75

Page 76

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Housing and Land
Continue to engage and work with tenants and other customers to design our services
Action Measures Comments/ Progress Status
Customer Engagement Programme agreed with tenant
representatives by August 2022
For the thirteenth consecutive year, an annual programme for
customer engagement and involvement was agreed with customers.
Complete
Service Development is
informed by
understanding our
customer satisfaction
Customer satisfaction programme developed and approved
by July 2022
The programme for 2022/23 has been approved and implemented. To
meet our Charter requirements, tenant satisfaction surveys were
conducted in relation to overall satisfaction, quality of home, value for
money and neighbourhood with excellent results achieved in all areas.
Green
levels of key service
areas
Results are reviewed quarterly, and any improvement
activities are identified and incorporated into services and
resource planning cycles
For areas progressed in 2022/23, all survey results have been
analysed and if required, improvement actions identified and
progressed.
Green
Provide high quality services to our service to our tenants, including those who live in sheltered housing and residents at our Gypsy/Travellers sites
Action Measures Comments/ Progress Status
Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement
Site Investment Masterplans reviewed in consultation with
residents and planned improvement works for progression
during 2022 and current works completed by 31 March 2023
Work continues to be progressed on both South Lanarkshire sites to
improve facilities and amenities available to residents. These works
are being taken forward in conjunction with site residents, who have
jointly developed site masterplans that highlight key projects they wish
to see take place. This includes the completion of significant pitch
extensions across both sites to provide residents with more space and
aid compliance with relevant fire safety standards.
Green
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Complete quality assurance checks to monitor and ensure
compliance with care inspectorate standards.  Each of the 34
sheltered housing complexes will be checked during 2022/23
with findings of completed checks reported on a quarterly
basis
Quality assurance continues to quality across services with high
compliance rates and levels of customer satisfaction.
Green
76

Page 77

IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
IMPROVe - SLC Performance Management System Report printed on Wednesday 2 August 2023
Resource Plan Scorecard actions and measures Housing and Technical Resources - Housing and Technical
Delivering the plan and achieving best value
Delivering the plan and achieving best value
Action Measures Comments/ Progress Status
Ensure effective
management of all
Resource budgets and
Business Plans
Overall budgetary targets achieved by March 2023 It is expected that overall budgetary targets will be achieved by the end
of the financial year.  Final details will be known once the annual
accounts exercise has been completed.
Green
Progress the council's
Digital Strategy within
the Resource
Continue with phased implementation of new IT system Following formal engagement with the supplier it was established that
they were unable to deliver the agreed requirements, and the Council
acted to terminate the contract.
A new supplier has now been appointed with a revised project plan in
place.
Red
77

Page 78

78

Page 79

Appendix 3 
HTR: Quarter 2 to Quarter 4 2022/2023 - Scrutiny of Change in Measure Status 
Measure Q2 Status Q4 Status Q4 Comments
Performance has declined from Q2 to Q4 
During 2022/23, reduce the
overall homelessness caseload
from 900 to 850 and reduce
long term homelessness
caseload by 10%
Amber Red The operating context in relation to
homelessness has proven to be
extremely challenging in the year.
The prevailing socio-economic
conditions adversely impacted upon
the ability to achieve this target
2022/23.  This trend has been
mirrored nationally.
No of times we did not, meet
our obligation to complete the
annual gas safety check by
annual anniversary date
Green Red Of the 20 out of date, 19 properties
were complete by year end, with the
remaining property currently an
active crime scene with access
prohibited.
% of Council stock meeting the
SHQS
Report Later Red The changes to the Fire Tolerable
standard have continued to impact
on the SHQS.  We have also
experienced difficulties with gaining
access to properties to complete
installation of interlinked alarms and
to carry out Fixed Electrical Testing.
Factoring collection rate Green Amber Despite increased revenue collection
of £200k, factoring collection fell
£73k short of the annual target.  This
was largely attributable to a £55k
increase in service charges and
rechargeable repairs.  It is also
considered that the cost of living
crisis led to factoring bills being
viewed as a lesser priority debt by
owners.
The General Services
Programme spend will be
achieved for the financial year
Green Amber Spend to quarter 4 £65.736m. 
Revised Estimated Expenditure
£78.396m.  Outturns were impacted
by the continued issue of securing
supplies and labour at the right time
due to issues caused by the
Pandemic, Brexit and War in
Ukraine. 
12
79

Page 80

80

Page 81

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023 
Report by: Executive Director (Housing and Technical Resources)  
Subject: Scottish Housing Regulator – Annual Assurance
Statement 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval to submit the Annual Assurance Statement for South Lanarkshire
Council to the Scottish Housing Regulator 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the South Lanarkshire Council Annual Assurance Statement 2022/2023
(attached as Appendix 1) be approved and submitted, to the Scottish Housing
Regulator 
3. Background
3.1. The Scottish Housing Regulator (SHR) was established in 2011 as an independent
body directly accountable to the Scottish Government to regulate registered social
landlords (RSLs) and local authority housing and homelessness services.  The SHR
does this by assessing and reporting on social landlord’s delivery of services, RSLs
financial wellbeing and standards of governance and where necessary, the SHR will
intervene to secure improvements. 
3.2. Following a consultation process, the SHR published a revised Regulatory
Framework in February 2019. 
3.3. Local authority landlords are required to submit an Annual Assurance Statement
confirming compliance with regulatory requirements which should also, if
appropriate, identify any material breaches.  Examples of such material breaches
specific to local authorities include those that seriously affect the interests and safety
of tenants, people who are homeless or other service users; threaten the stability,
efficient running or viability of service delivery arrangements and bring the landlord
into disrepute or raise public or stakeholder concern about your organisation or the
social housing sector. 
3.4. South Lanarkshire’s Annual Assurance Statement for 2021/2022 was approved by
Housing and Technical Resource’s Committee on 5 October 2022 and subsequently
submitted to the SHR following approval. 
4. South Lanarkshire Council Annual Assurance Statement
4.1. The Council’s Annual Assurance Statement 2022/2023 is attached as Appendix 1.  
13
81

Page 82

As recommended by SHR guidance, this is short, succinct and based upon the
format provided by the regulator.   
4.2. The key requirement of the Annual Assurance Statement is for the Committee to
confirm that it is confident that appropriate systems, evidence, relationships and
channels of communication are in place to ensure the effective planning, delivery
and monitoring of relevant services against statutory and regulatory requirements. . 
4.3. Within South Lanarkshire, the assurance required is provided through a wide range
of arrangements which are in place, at a Council and Resource-wide level.  A
summary of the key requirements for assurance and how these are addressed is
attached as Appendix 2. 
4.4. Provided that tenant and resident safety is not compromised, the SHR continues to
indicate it will not engage with a landlord where they do not fully comply with
regulatory requirements and the landlord has effective plans to return to full
compliance.  In relation to this year’s statement there are 2 aspects, highlighted
below, where the Council is partially compliant:- 
 Fire Tolerable Standards
 Fixed Electrical Testing 
4.5. In relation to the reporting requirements for the Fire Tolerable Standards and Fixed
Electrical Testing, a programme of work is progressing well, however, a number
remain outstanding due to the inability to gain access to carry out the necessary
installations/testing.  A robust programme of work is in place to address these issues
including the appropriate use of forced entry, which is being closely monitored within
the Resource. 
4.6.  In this year’s Annual Assurance Statements, local authorities are asked to provide
assurance that they have an effective approach to the collection of equalities
information and are considering how they will progress towards a human rights
based approach.  This has been reflected in the proposed Annual Assurance
Statement. 
5. Next Steps
5.1. Subject to approval, the Annual Assurance Statement will be signed off by the Chair
of Housing and Technical Resources Committee and returned, as required, to the
Scottish Housing Regulator to confirm the required assurance. 
5.2. The results of the Annual Return on the Charter 2022/2023 are presented as a
separate report to this Committee. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. There are no financial implications associated with this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report.   
82

Page 83

9. Other Implications
9.1. There are no additional risks associated with this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. In addition to regular regular discussion with the Tenant Participation Co-ordination
Group on performance and Charter reporting, specific engagement has taken place
to confirm arrangements for the development and submission of the Annual
Assurance Statement. 
Stephen Gibson 
Executive Director (Housing and Technical Resources) 
20 July 2023 
Link(s) to Council Values/Objectives
 Accountable, effective, efficient, and transparent 
Previous References
 Our regulation of Scottish Housing – H&TR Committee Report 23 January 2019
 Scottish Housing Regulator - Regulation of Social Housing in Scotland – H&TR
Committee Report 4 September 2019
 Scottish Housing Regulator – Annual Assurance Statement – H&TR Committee Report
25 November 2020
 Scottish Housing Regulator – Annual Assurance Statement – H&TR Committee Report
29 September 2021 
 Scottish Housing Regulator – Annual Assurance Statement – H&TR Committee Report
5 October 2022 
List of Background Papers
 Our Regulation of Scottish Housing – a discussion Paper January 2018
 Our Regulation of Scottish Housing – a Consultation October 2018 
 Our Regulation of Scottish Housing – Final Framework 2019 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Cameron Mitchell
Ext:  845 4862
E-mail: cameron.mitchell@southlanarkshire.gov.uk
83

Page 84

Appendix 1 
Housing and Technical Resources
Executive Director Stephen Gibson 
Our Annual Assurance Statement 
South Lanarkshire Council complies with the regulatory requirements set out in Chapter 3
of the Scottish Housing Regulator’s Framework. This includes that we: 
▪ achieve all standards and outcomes in the Scottish Social Housing Charter for
tenants, people who are homeless and others who use our services; 
▪ comply with all our legal obligations relating to housing and homelessness, equality
and human rights, and tenant and resident safety with the exception of the following:- 
o Fire Tolerable Standards / Fixed Electrical Testing – a programme of work is
progressing well, however a number remain outstanding due to the inability to
gain access to carry out the installations/testing.  A robust programme of work is
in place to address these issues which is being closely monitored within the
Resource. 
In relation to equalities data collection, the Council has well established processes and
policies in this area, with consideration already embedded in the way services are
delivered.  Work is being progressed to further develop and adjust our services to ensure a
human rights based approach along with other changes to reflect the requirements of the
regulatory guidance and current and future legislation. 
On an ongoing basis, the Committee specifically consider the information and evidence
necessary to provide the required assurance. 
The Annual Assurance Statement for 2022/23 was approved at the meeting of the council’s
Housing and Technical Resources Committee on 30 August 2023. 
Chair’s signature: 
Date: 
84

Page 85

Appendix 2
Assurance Requirements 
What Assurance required How assurance is evidenced
Monitor and
report
performance
Performance Management
Framework in place and
appropriately reported 
On an annual basis a report is provided
to Housing and Technical Resources
Committee on performance against
Scottish Social Housing Charter
requirements. Performance against the
charter requirements for 2022/23 will be
reported to HTR Committee on 8
November 2023.
Effective Resource and Service
planning arrangements are in
place. 
Resource and Service plans are in
place to monitor progress at different
levels of the planning hierarchy i.e.,
Community Plan, the Connect (Council)
Plan, Resource and Service Plan
actions and measures. 
Progress against Connect and
Resource Plan objectives are reported
to Housing and Technical Resources
and Executive Committee on a twice
yearly basis.
Appropriate Internal Audit
arrangements are in place 
A comprehensive internal audit
programme is reviewed and
implemented yearly in line with service
requirements. 
Progress against the audit programme
is reported to Finance and Corporate
Resources Committee.
Equality and
Diversity 
Equality and diversity issues are
effectively considered when
making decisions.
Work within the Resource in relation to
equality and diversity is reported to
Housing and Technical Resources
Committee on an annual basis. The last
reported 14 December 2022 with next
report to reported to be presented on 8
November 2023.
Involve
tenants and
other relevant
service users 
Council and Resource Customer
satisfaction levels 
The Resource has a rolling programme
of customer satisfaction surveys in
place. These are used to inform policy
and service development.
Key results from the survey programme
are reported to the Housing and
Technical Resources Committee as
part of the annual report on
performance against the Scottish Social
Housing Charter.
Customer Involvement and
Scrutiny Programme in place
and being delivered 
Progress in relation to customer
involvement and scrutiny was reported
to committee as part of the annual
review of the Customer Involvement
Strategy on 5 October 2022.
85

Page 86

What Assurance required How assurance is evidenced 
The Customer Involvement Strategy
2023-28 will be developed and
consulted on during 2023/24 before
being submitted for approval to Housing
and Technical Resources Committee in
November 2023. 
Legal
obligations
Ensure that all legal obligations
associated with housing and
homelessness are adhered to.
The Resource Strategy and Policy
Review Framework ensures policies
and strategies are reviewed on a
cyclical basis to confirm that they are
delivering the intended outcomes,
reflect changes in policy/services
context and are consistent with legal
and regulatory requirements. 
An update on the framework is
presented to Housing and Technical
Resources Committee on an annual
basis. This will be reported to the
Committee on 8 November 2023. 
Risk Management Strategy is reported
to the Housing and Technical Resource
Committee on a yearly basis. This will
be reported to Housing and Technical
Resource’s Committee in November
2023. 
This corporate approach to risk
management promotes consideration of
risk in service delivery, planning and
decision making processes.  The
Strategy requires Resources to record
and review risks and control actions
regularly.  
Tenant and
resident safety
Have evidence to ensure that all
legal obligations associated with
tenant and resident safety are
met, including: - 
• Gas safety 
• Electrical safety 
• Water safety 
• Fire safety 
• Asbestos 
• Damp and Mould 
• Lift safety 
Effective systems for monitoring and
reporting health and safety issues are
in place within the Resource and
monitored through the Corporate
Management Team. Any proposals to
address emerging health and safety
requirements would be reported to
Housing and Technical Resources
Committee and the Annual Return on
the Charter. 
86

Page 87

Report
Agenda Item 
Report to: Housing and Technical Resource Committee 
Date of Meeting: 30 August 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Review of the South Lanarkshire Rapid
Rehousing Transition Plan 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update Committee on the completion of the fourth annual review of the Rapid
Rehousing Transition Plan (RRTP) 2019 to 2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the progress made in delivering the RRTP objectives, as set out in the
RRTP Annual Review 2022/2023, attached as Appendix 1, be noted; 
(2) that the proposed revisions to the RRTP, detailed in section 5, be approved;
and 
(3) that the key priorities to be progressed in 202320/24, detailed in section 6, be
noted 
3. Background
3.1. In October 2017, the Scottish Government established the Homelessness and
Rough Sleeping Action Group (HARSAG) to develop solutions to ending
homelessness and rough sleeping across Scotland.  One of the key
recommendations of the Group, which was adopted by the Scottish Government,
was the requirement for local authorities to develop a 5-year RRTP.   
3.2. South Lanarkshire’s RRTP was developed in collaboration with a wide range of
partners and stakeholders in 2019 and is subject to an established annual review
process.  The plan built upon a long-standing commitment and a well-established
framework within South Lanarkshire, to meet the needs of homeless people. 
3.3.  The third annual review for the year 2021/2022 was approved by Housing and
Technical Resources Committee on 10 August 2022. 
3.4. In accordance with requirements, the fourth annual review, covering 2022/23, was
submitted to the Scottish Government on 25 August 2023.  When forwarding the
review, it was noted that it was being submitted, subject to approval of the first
meeting of the Housing and Technical Resources Committee following the required
submission date. 
14
87

Page 88

4. Annual Review 2022/2023
4.1. The RRTP review is structured around 5 high level priority objectives.  There are 53
indicators against which the Council and its partners monitor progress, comprising
33 actions and 20 measures.  In accordance with wider reporting arrangements
across the Council, these indicators are categorised into ‘blue’, ‘green’, ‘amber’ and
‘red’ depending on the progress made against them. 
4.2. It was an extremely challenging year, both locally and nationally, in terms of
maintaining progress.  Nationally it has been reported that homelessness figures
were at the highest they had been since records began in 2002.  During 2022/2023,
in line with national trends, homeless levels spiked in South Lanarkshire with a 17%
increase in homeless presentations.   
The challenging economic climate, the “cost of living crisis” and changes in the
private rented sector are thought to have driven the increased demand for
homelessness services.  The position was further exacerbated by the impact on the
housing system of the positive contribution which the Council and local RSLs played
in providing accommodation to Ukrainian households displaced by the invasion.   
4.3. Despite the most challenging of contexts in 2022/2023, positive progress was made
with over 92% of the indicators on or only slightly behind target, to achieve the
projected outcomes within the identified timescales.  Table 1 below, details the
categorisation of the 53 indicators. 
Table 1: Categorisation of RRTP Indicators 2022/2023 
Status Measures Actions Total %
Blue 0 3 3 5.66%
Green  15 28 43 81.13%
Amber  3 0 3 5.66%
Red  2 0 2 3.77%
Report later/Contextual 0 2 2 3.77%
Totals  20 33 53 100.00% 
4.4. Table 1 illustrates that good progress continues to be made within the RRTP, with 3
indicators completed, 43 are progressing well and on target, 3 showing minor
slippage and 2 with major slippage. 
4.5. Full details and progress against all indicators are provided in the RRTP Annual
Review 2022/2023, attached as Appendix 1 and is summarised in Table 2 below. 
Table 2: Summary of RRTP Year 4 Achievements 
RRTP Priority 
Objective 
Achievement 
1. Prevent
homelessness
occurring and
significantly reduce
homelessness 
• A further improvement of availability in affordable
housing has been seen in 2022/2023 with a total of
233 additional homes delivered.
• In 2022/2023 there was a continued focus on early
detection and intervention to prevent
homelessness where possible. Despite an increase
in the demand for housing options service, 65% of
advice cases were closed with support being
provided preventing homelessness from occurring. 
88

Page 89

RRTP Priority 
Objective 
Achievement 
• Delivery of a bespoke pathway to prevent
homelessness for those affected by domestic
abuse, with 17 people supported through the year. 
2.  Significantly reduce
time spent by
households in
temporary
accommodation and
minimise moves
before moving to a
settled home 
• Since the last annual review there has been a
further 4% reduction in the number of households
who have spent more than 12 months in temporary
accommodation. 
• A 65% reduction in long term homelessness over
the life of the plan from 120 in 2019/2020, 56 in
2020/2021, 42 in 2021/2022 and 40 in 2022/2023.
• We have also seen a 4% reduction in time spent in
temporary accommodation from an average of 181
days in 2021/2022 to an average of 174 days in
2022/2023. 
• An increase in the number of temporary tenancies
which have been ‘flipped’ to a Scottish Secure
Tenancy, providing the homeless household with a
permanent home and avoiding the need for the
disruption of further moves.  A total of 105
tenancies have been flipped since the beginning of
the plan, 30 of these during 2022/2023.
• The Council and its HomeFinder Registered Social
Landlord (RSL) partners continue to maximise the
percentage of lets to be directed to those on the
Homeless List. In 2022/2023, 58% of council
properties were let to homeless applicants.
HomeFinder RSLs collectively let 38% of vacant
properties to homeless households. 
3.  Improve and increase
the provision of
housing support for
households to live
independently within
communities 
• Tenancy sustainment levels remain high at 92% for
overall tenancies and 91% for previously homeless
households.   
• Improved understanding of the impact of support
services for homeless households a new outcome
measure tool, the Wellbeing Web introduced during
the year showed positive outcomes for nearly 82%
of households in relation to issues such as
managing a home, addiction, mental health and
community connections. 
4.  Expand the scope of
Housing First and
capacity of our
Housing First
approach to be the
first response for
households with
multiple complex
needs 
• In 2022/2023 a further 3 individuals were
supported through Housing First totalling 36
supported since the service began.  
• Continued growth of the partnership Community
Harm Reduction Hub enabling those supported by
the Housing First service to access group work,
harm reduction intervention, psychosocial
implementation and build on life skills.
89

Page 90

RRTP Priority 
Objective 
Achievement 
5. Enhance integration
of partnership working
to embed RRTP
through a whole
systems approach 
• The new Local Housing Strategy (LHS) 2022 to
2027 approved in November 2022 was developed
to complement the RRTP.
• Close partnership working continues to develop
and progress specific ‘Directions’ within the
Strategic Commissioning Plan 2022 to 2025.
Progress made over last year includes positive
partnership with community links health team. The
Council has also successfully agreed an
information sharing arrangement with the National
Health Service enabling data trend analysis to
understand links between health and
homelessness data with a view to aiding
preventative activity. 
5. Proposed Revisions to the RRTP
5.1. In addition to reviewing the progress made against the actions and measures set out
within the RRTP action plan, the annual review also provides the opportunity to re-
examine the plan to ensure that the priority objectives, actions and measures remain
appropriate, relevant and measurable. 
5.2. Table 3 below details the proposed amendment to the RRTP and sets out the existing
action to be removed and the proposed replacement action.  Subject to approval, this
revision will be incorporated into the RRTP action plan for 2023/2024. 
Table 3: Proposed new action for inclusion in RRTP action plan 
RRTP
Ref.
Current action/
measure
Status RRTP
Ref.
Proposed replacement
action/measure (where
appropriate)
M1.1A The number of
homeless
Presentations
Red M1.1 It is looking increasingly unlikely that
the target to reduce by 10%-20% will
be met due to the increasing
pressures from external factors out
with the control of the authority. 
It is proposed therefore that the
target for this measure be
amended to “maintain or reduce
the level of homeless
presentations in the year.”
M1.2A Level of
Homeless
Households
(homelessness
caseload at year
end)
Red M1.2 It is looking increasingly unlikely that
the target to reduce by 10%-20% will
be met due to the increasing
pressures from external factors out
with the control of the authority. 
It is proposed that the target for
this measure be amended to
“maintain or reduce level of
homelessness.” 
90

Page 91

6. RRTP Priorities for 2023/2024
6.1. The review of progress in Year 4 of the RRTP noted that, under very challenging
circumstances, significant positive indicators of success have been achieved.  The
review also confirmed the continuing commitment of partners to delivering RRTP
priorities over the short-term as well as securing the longer-term objectives of the
plan. 
6.2. Year 5 priorities will build on key learning points from the first 4 years of the plan and
also on the progress achieved by working in partnership to deliver services which are
focussed on preventing homelessness and minimising the impact of homelessness
where crisis cannot be avoided. 
6.3. Detailed below is a summary of the key priorities to be progressed during Year 5 of
the plan (2023/2024):- 
 continue to deliver affordable homes for social rent
 ongoing focus on prevention of homelessness, particularly in relation to
households with children through continuing to maximise social lets to
homeless households and continued support to access and sustain in relation
to the private sector
 continue to reduce long-term homelessness
 further progress the homelessness directions contained within the Strategic
Commissioning Plan
 continue to maintain and develop links to the Local Child Poverty Action Plan
 monitor implementation of pathways for victims of domestic abuse, with addition
of ADP funded specialist support
 continue to work with Social Work Resources to develop housing options for
young care leavers including supported accommodation model
 further develop the approach for individuals released from prison by expanding
the service by linking in with female prisons
 continue to focus on pathways and a Housing Options approach for young
people
 continue to develop, promote and monitor the Private Sector Access and
Sustainment Service
 the RRTP currently funds a ‘Homestart’ service to all new tenants.  A review of
the current service will be undertaken during 2023/2024 to assess the
outcomes achieved and any future service developments
 continue to expand Council’s Housing First approach
 continue to convert temporary units to permanent accommodation
 complete review of support service provision and identify proposals for
implementation of revised approach to commission and delivery of trauma
informed support services
 review of Commissioned Services exploring opportunities of partnership
working for efficiencies and to lever in funding that will add value to existing
homelessness services
 further progress ongoing work with RSL partners to expand Homefinder
Common Housing Register 
7. Next Steps
7.1. The RRTP Annual Review 2022/2023, attached as Appendix 1, was submitted to the
Scottish Government by the required timescale of 25 August 2023 subject to
approval by Housing and Technical Resources Committee on 30 August 2023.
Officers await feedback from this submission and will consider any relevant actions
within this. 
91

Page 92

7.2. The outcomes from the RRTP Annual Review 2022/2023 will be presented to the
South Lanarkshire Community Planning Partnership Board for noting later in the
year. 
7.3. It is proposed that the RRTP will be replaced in 2024/2025 and that a final review of
the current plan will be presented to the Housing and Technical Resources
Committee in September 2024. 
8. Employee Implications
8.1. There are no employee implications as a result of this report. 
9. Financial Implications
9.1. The RRTP confirmed the significant level of resources required to be directed
towards the prevention and alleviation of homelessness.  While the Scottish
Government has provided £2,659,892 in funding to assist in the development and
implementation of the RRTP, this was significantly short of the £7.31 million set out
as required in the original plan.   
Experience during 2022/2023 has shown the need for a fundamental review of long-
term resourcing requirements for homelessness at a national level, indeed this point
was highlighted by the recent report by the Temporary Accommodation Task and
Finish Group.  The Group made 15 recommendations to the Scottish Government
including action should be taken to make changes to the funding of homelessness
services to ensure they are funded sufficiently. 
9.2. The funding provided by the Scottish Government to date includes £453,000 to
support the continued implementation of the RRTP in 2022/2023 and a further
£460,892 for 2023/2024.  This funding will continue to be used to progress delivery
of the 5 key priority objectives of the plan. 
9.3. As part of the ongoing RRTP monitoring and review process, consideration is given
by all partners on how to further embed RRTP activities into mainstream services. 
At the same time partners will continue to identify opportunities to access additional
funding, which is required to meet not only RRTP objectives but also to support
achievement of national objectives detailed within the Ending Homelessness
Together Action Plan. 
10. Climate Change, Sustainability and Environmental Implications
10.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
11. Other Implications
11.1. the content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
11.2. There are no additional risks associated with this report. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. An equality impact assessment was carried out on the RRTP.  The assessment
confirmed that the plan will make a positive contribution to the promotion of
equalities. 
92

Page 93

12.2. A Strategic Environmental Assessment (SEA) pre-screening determination was
completed as part of the development of the RRTP 2019 to 2024.  This confirmed
there is no requirement for a separate SEA to be carried out for the RRTP. 
12.3. The RRTP was developed and co-produced with a range of key partners and
stakeholders.  These groups have confirmed their commitment to work together to
ensure the delivery of the priority outcomes.  Through the Homelessness Strategy
Group, these partners have been involved in monitoring and reviewing progress of
the plan. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
18 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Our children and young people thrive.
 Good quality, suitable and sustainable places to live 
Previous References
 None 
List of Background Papers
 South Lanarkshire Rapid Rehousing Transition Plan 2019-24, Housing and Technical
Resources Committee Report, 23 January 2019. 
 Annual Review of the South Lanarkshire Rapid Rehousing Plan 2021/22. Housing and
Technical Resources Committee Report, 30 August 2023. 
Contact for Further Information
If you would like further information, please contact: 
Jacqueline Fernie, Homelessness and Housing Support Manager
Jacqueline.fernie@southlanarkshire.gov.uk
Linzi Brunton, Strategy Co-ordinator (RRTP)
Linzi.Brunton@southlanarkshire.gov.uk
93

Page 94

94

Page 95

14
95

Page 96

1 
South Lanarkshire Council 
Rapid Rehousing Transition Plan   
Annual Review 2022/23 
96

Page 97

2 
Contents 
Foreword ................................................................................................................................ 3
1. Executive Summary ........................................................................................................ 4
2. Homelessness Trends in the Year ................................................................................. 9
3. Year Four progress ....................................................................................................... 16
4.  Proposed Changes to Rapid Rehousing Transition Plan (RRTP) ............................. 24
5. Priorities for 2023/24 .................................................................................................... 24
Appendix 1: RRTP Action Plan ........................................................................................... 27 
97

Page 98

3 
Foreword
Councillor Davie McLachlan
Chair of Housing and Technical Resources Committee 
I am pleased to report that that the fourth year of South Lanarkshire’s
Rapid Rehousing Transition Plan has been another successful one despite
the significant challenges we have faced over the last 12 months. The
marked increase in demand for homelessness services which has been
experienced locally and nationally during the year has bucked trends
reported in previous years RRPT reviews. Once again however local
services have stepped up to meet the challenges, preventing
homelessness where possible, otherwise providing appropriate
accommodation and support services to meet individual needs whilst also
meeting unprecedented and wide-ranging needs arising from humanitarian
programmes, in particular from Ukraine. 
This review shows the breadth of work that has been undertaken over the year and the ongoing
commitment to delivering quality, person centred services to achieve positive and sustainable
outcomes. We have now moved beyond our commitment to deliver 1,000 additional council homes
by setting a new target of an additional 1300 homes by 2027. Working collaboratively with our
housing association partners to deliver a significant increase in additional affordable homes which is
key to achieving the significant reduction in homelessness at the heart of our plan. 
As we move forward into year five, the final year of the plan, I am confident that we will continue to
build on the good work and outcomes already achieved despite the challenging context.  Ensuring
we maximise opportunities to increase the supply of affordable housing, prevent homelessness
wherever possible or effectively respond with appropriate packages of accommodation and support
as our foundation for delivering the impact on homelessness and individual outcomes which we
seek to achieve over the remaining year of the plan. 
Councillor Joe Fagan
Chair of South Lanarkshire’s Community Planning Partnership Board
Over the past year, our communities have faced real challenges in terms of
meeting their basic needs and this year’s review demonstrates the scale and
nature of the efforts that partners have directed towards tackling homelessness in
what has been the most difficult of circumstances. 
This review highlights just some of the excellent work that is being
delivered across the Community Planning Partnership every day to
improve the lives of people in South Lanarkshire. Over the last year the
focus has remained on prevention of homelessness and where prevention
is not possible to minimise the impact on individuals, families  and
communities through rapid provision of quality temporary housing, based
on our model of temporary housing being ordinary homes within ordinary communities, quality
98

Page 99

4 
trauma informed housing and homelessness services including specialist support services where
required to meet the needs of some of the most vulnerable people in our society.
We must continue to work together, utilising the strength of the Community Planning Partnership to
understand need, respond effectively to increased pressures and continue our path to achieving
change in addressing homelessness across South Lanarkshire over the final year of the Plan and
beyond. 
1. Executive Summary 
Effective partnership working and a shared commitment to addressing homelessness has
enabled good progress to be made over the period since South Lanarkshire’s Rapid Re-
Housing Transition Plan (RRTP) was approved. Indeed, the position recorded at the end of
the previous year noted the scale of the progress which had been made in preventing and
resolving homelessness, including;
• a 21% reduction in overall homelessness, 
• a 25% reduction in long term homelessness (households residing in temporary
accommodation for over 12 months), 
• a 22% reduction in time spent in temporary accommodation by households with
children and 
• a reduction of 8% in the number of children affected by homelessness.
2022/23 has however proven an extremely challenging year both locally and nationally in
terms of maintaining progress, with a 17% increase in homeless presentations in South
Lanarkshire accompanied with a 38% increase in homelessness since 2021/22. Nationally it
has been reported that homelessness figures are at the highest they have been since
records began in 2002. 
In reviewing the fourth year of the plan the Homelessness Strategy Group reflected on the
changing environment in which partners operate, not least the national spike in
homelessness, the cost-of-living crisis and wider increasing demand and pressures in the
housing system, including from humanitarian programmes. 
Notwithstanding this context the partnership has reiterated its ongoing commitment to
working over the longer term to prevent homelessness wherever possible and support those
at risk of or who are experiencing homelessness. A summary of the key highlights over the
last year, the fourth year of the RRTP include: - 
• A continued reduction in long-term homelessness, with 67% fewer homeless
households living in temporary accommodation for more than 12 months over the
lifespan of the plan.
• A further 3.7% reduction in the number of days people resided in temporary
accommodation now 174 days.
• The avoidance of homelessness in 65% of cases through positive prevention activity
by the Councils Integrated Home Options service.
• Continued success in the pathway plan approach to meeting the housing needs of
care experienced young people, with 100% (51) over the last year having a
99

Page 100

5 
completed pathway plan. Of the 51 young care leavers seeking housing 30 have
had tenancies secured and 7 are under offer, increasing average age for move onto
independent living to 21. The sustainability for this group is positive with 93% of
tenancies sustained over last year.
• Continue delivery of new affordable homes for social rent in South Lanarkshire with
a total of 233 additional council homes during the year.
• The development of a short video to improve awareness of housing options and
homelessness in secondary schools with active participation from homeless service
users. This will be rolled out to education to incorporate into the school curriculum
and shared with other services through 2023/24.
• A further 30 temporary homes converted to secure tenancies, best meeting the
needs and choice of the household.
• Increase in social rented properties directed to homeless households, 58% of all
vacant council homes and 38% of Registered Social Landlord lets in 2022/23.
• Continued progress raising awareness and testing approaches to homeless
prevention via routine enquiry and collaborative response, informing priorities for
coming year in relation to Homelessness Directions contained in the Strategic
Commissioning Plan.
• Continued to support victims of domestic abuse through the implementation of
specific housing pathway and housing representation at all Multi Agency Risk
Assessment Conference (MARAC) meetings. Ensuring a multi-agency approach
and resulting in successful work being carried out with 17 people through 2022/23. 
• Evaluation of SHORE project reflected that the liberation process has enabled us to
reduce the number of prisoners having to present as homeless and securing
accommodation on their release. The dedicated SHORE worker engaged with 197
people, 70 cases were able to return to their previous residence and 9 with offers of
accommodation.
• Continued growth of the Housing First approach with a further 3 households with
multiple and complex needs supported during 2022/23, in addition to the cumulative
36 individuals supported through the programme.  At year end 75% of Housing First
cases have seen improvement in their overall outcomes. 
• Increase in homelessness prevention through hardship sustainability funding and
support services across all housing tenures.
• 81.8% improvement in distance travelled with internal housing support was recorded
through the introduction of Wellbeing Web.
• High level of tenancy sustainment continues with 91% of homeless households
sustaining their tenancy for over 12 months in 2022/23. 
1. Background
1.1 National Context
While previous reviews have documented the dynamic context within which the RRTP is
being implemented the fourth year of the plan, as noted above, has been progressed in the
most challenging set of circumstances since the inception of the plan. A summary of key
developments and challenges in the year is detailed below: 
• The links between homelessness and poverty are well documented, in 2022/23 there
has been a continued economic downturn accompanied by the “cost of living crisis”.
Global and national economies have been significantly affected by the impact of Covid
19 and the war in Ukraine which have directly impacted on the housing system. It is
100

Page 101

6 
expected the challenges will continue to disproportionately impact on economically
disadvantaged households who are at greatest risk of homelessness. 
• ‘Preventing Homelessness in Scotland,’ a consultation published jointly by The Scottish
Government and COSLA in December 2021, sought views on proposals to introduce
statutory prevention duties across public bodies, re-emphasising the responsibility for
preventing homelessness needs to be shared across community planning partners. The
forthcoming Housing bill is expected to be published later in 2023 will clarify the
legislative implications.
• Rapid Rehousing Transition Plans: Making the case for the next five years. The
Chartered Institute of Housing Scotland (CIH) together with Fife Council published a
report building on the work in July 2021 by CIH Scotland, highlighting the importance of
Rapid Rehousing Transition Plans (RRTPs) as part of the Ending Homelessness
Together commitment. Nevertheless, the Scottish Government has yet to confirm the
requirements and expectations for RRTPs from 2024.
• A Temporary Accommodation Standards Framework was published by the Scottish
Government in May 2023, intended to ensure all temporary accommodation throughout
Scotland is of a consistently high quality. The framework covers the standards that
should be achieved by all social landlords relating to physical, location, service, and
management of temporary accommodation. The Scottish Government continue work to
set out how standards will be monitored and enforced nationally. 
1.2  South Lanarkshire Context
South Lanarkshire Council has a long-standing strong commitment to meeting the needs of
homeless people. During 2022/23 the partnership focus on improving outcomes, both
through prevention and response activity continued. This included the commitment set out in
the Health and Social Care Partnership’s Strategic Commissioning Plan (2022-25).
The alignment of the RRTP with community planning was also further established during the
year with the inclusion within the new “Community Plan 2022 to 2032” of the following high-
level priority. 
“We will work in partnership to prevent and significantly reduce homelessness and
improve outcomes for those at risk of or who experience homelessness.” 
1.3 Co-production and Oversight of the RRTP 
The South Lanarkshire RRTP was co-produced through intensive engagement with key
partners and this approach has been continued in the development, delivery, and review of
the plan continuing to meet varying need, pressure on limited housing resources and the
cost-of-living crisis.  
The Homelessness Strategy Group who are responsible for monitoring and reporting in
relation to the RRTP continued to meet throughout 2022/23. 
A system of quarterly monitoring of the RRTP Measures and Actions was continued through
2022/23. This kept relevant stakeholders and senior management informed of progress
throughout the year and provided the opportunity to raise awareness of Rapid Rehousing.
Senior managers from Housing and Technical Resources also attended regular meetings of
the Housing Options West HUB meeting and represent the West HUB at the National
101

Page 102

7 
Homeless Prevention RRTP subgroup, benefiting from shared learning across authorities
and Scottish Government updates and discussions.
During 2022/23, further work continued to strengthen partnership links, ensuring
homelessness and its wider impact is appropriately reflected in each strategy/plan. Key
developments included: -
• The inclusion of the high-level priority relating to homelessness within the new
“Community Plan 2022 to 2032”. 
• the inclusion of homelessness prevention actions and monitoring within the Children’s
Services (Corporate Parenting) Action Plan and Re-designing Children’s Services plan.
• the progression of two Homelessness Directions within the Health and Social Care
Partnership’s Strategic Commissioning Plan (2022-25).
• the inclusion of action on homeless prevention within the Alcohol and Drug Partnership
Strategy 2020-23 (Priority 4 A public Health Approach) and overall emphasis on early
intervention and prevention.
• the inclusion of actions relating to homelessness within the Local Child Poverty Action
Plan 2021/22.
• Continued focus on actions to support victims of domestic abuse from the Make a Stand
pledge. 
1.4 Funding
The Scottish Government awarded £453,000 to South Lanarkshire Council to fund RRTP
delivery during 2022/23. The total funding that was originally sought to support the RRTP was
£7.31million.
Since the first award of funding form the Scottish Government in 2019, and taking account of
the confirmed award for 2023/24 of £460,892 a total of £2,659,892 has been awarded to
support the development and implementation of RRTP, the breakdown is as follows:
RRTP funding received by year Amount
2019 £105,000 (start-up funding)
2019/20 £461,000
2020/21 £453,000
2020/21 £282,000
2021/22 £445,000
2022/23 £453,000
2023/24 £460,892 
It should be emphasised that partner contributions require to be considered broadly to include
not only financial resources but other partner contributions such as realignment of staffing
resources and service priorities to support delivery of the RRTP. 
102

Page 103

8 
A summary of the key areas which have been progressed during the year using funding
received from the Scottish Government’s Ending Homelessness Together Fund is detailed
below: -
• Expansion of specialist support services to meet a range of complex need including
repeat homelessness, multiple needs in particular addiction and mental health, further
supported by Alcohol and Drug Partnership (ADP) funding.
• Scaling up of the Housing First approach to meet the needs of the most vulnerable
offering greater choice and support to access and make a house a comfortable home.
• Continued focus on homeless prevention at points of transition in people’s lives,
including the further development of the Sustainable Housing on Release for Everyone
(SHORE) 
• Continued delivery and further development of 
o approaches to Gender Based Violence and
o housing pathway planning for young people moving on from care. 
• The further development of services to prevent homelessness in the private sector
through the Private Sector Access and Sustainment Service delivering advice along with
practical and financial support to access and sustain private tenancies. 
The original RRTP identified the need for £7.31million to resource the 5-year plan. To date
£2,659,892 has been provided. The commitment for a further two years funding from the
Scottish Government is welcomed. From the outset RRTP funding has been used to help
establish or further develop key aspects of the RRTP. It should be emphasised that the
overwhelming level of resources that partners have contributed to support delivery of the
RRTP. 
Experience across 2022/23 has shown that the high level of resources required to provide
resilience is essential to maintain forward trajectory for homelessness when in context of the
most challenging socio-economic circumstances.  
1.5 Other funding sources
Throughout the period of the RRTP the partners within the Homelessness Strategy Group
have worked together to actively consider alternative funding routes to take forward priority
activities and identify opportunities to mainstream services and budgets to be revised or re-
focused to help deliver RRTP priorities.
Progress was made in the year with:
• The Alcohol and Drug Partnership has also confirmed an allocation of £40,000 in year
five of the plan to deliver services specifically designed to meet the needs of vulnerable
women with addictions. ADP currently considering opportunities to further support
prevention activity during 2023/34 including funding to increase SHORE, residential
pathway plan and intensive support activities.
• South Lanarkshire Council contributed £10,000 towards delivering the SHORE project
with a further £15,000 confirmed for 2023/24.
• Work across mental health and addiction services to remove barriers to access.
103

Page 104

9 
2. Homelessness Trends in the Year 
During 2022/23, in line with national trends, homeless levels have spiked. The challenging
economic climate, the “cost of living crisis” and changes in the private rented sector are
thought to be driving the increased demand for homelessness services. 
Over the last year South Lanarkshire has seen a 17% increase in homeless presentations
and over 30% increase in the number of households assessed as homeless awaiting settled
accommodation. 
The Council is continuing to deliver quality homeless prevention and response services,
striving to prevent homelessness where possible or effectively respond, with continued
success across a range of measures for example reduction in repeat homelessness. 
2.1 Humanitarian Assistance
This year has also witnessed a huge uplift in the level of support provided across the range
of humanitarian programmes. This has included seeking to increase and support hosting
arrangements and offering quality housing options advice. 
The has required a significant increase in the involvement of local partners to support
national refugee resettlement programmes, with the establishment of the “Homes for Ukraine
Scheme” and the continued expansion of the “Afghan Resettlement Programme.”
Additionally, in April 2022 the UK Government also announced its intention to implement a
policy of “full dispersal” of asylum seekers with target levels of dispersal to each nation and
region established during 2022/23. During 2022/23 the Council and other partners have
actively engaged with COSLA and the Home Office to support implementation of the
dispersal programme which it is anticipated will increase significantly in scale in 2023/24. 
Given the on-going crisis in Ukraine and wider global uncertainty it can be anticipated that
demand for housing and support services for refugees and people seeking asylum will
significantly increase in the year/s ahead. 
During 2022/23 South Lanarkshire played an active role in assisting Ukrainian households
resettling in Scotland, over 600 people were accommodated in welcome hub hotel
accommodation over the course of the year, 74 families were supported to settle in
secure tenancies across our communities and the Refugee resettlement team also
supported a further 188 individuals accommodated via host schemes.   
Interim accommodation was developed at Barrack Street former student accommodation
to provide accommodation and support services for 150 single Ukrainians. The service
opened in January 2023, delivered in partnership with The Salvation Army offering an
opportunity to move on from hotel provision, to find work and have time to make move on
plans to other housing options e.g., private rented sector longer term.   
South Lanarkshire’s focus on supporting households and delivering innovative solutions
has helped prevent homelessness from humanitarian programmes within South
Lanarkshire, also assisting nationally supporting the disembarkation of both the Glasgow
and Edinburgh Ukrainian ships ensuring the smooth arrival of families into South
Lanarkshire.   
Alongside supporting Ukrainian nationals, the Refugee Resettlement service continued to
support 53 refugee families (202 individuals) already settled in the local authority area and
welcomed three new families who arrived as part of the Home Office UK Resettlement
Scheme.  
104

Page 105

10 
2.2 Homelessness demand 
o Figure 1 below demonstrates the trend in the number of homelessness presentations
received between 2002/03 and 2022/23, measured against the number of cases where the
council had a duty to house the applicant and the number of cases that resulted in a Scottish
Secure Tenancy being allocated upon case closure.
Figure 1 – Homelessness trends 2002-2023 
• There has been a 17.2% increase in the number of homeless presentations, from 2134
in 2021/22 to 2502 in 2022/23. This is likely to be due to the external economic issues
affecting the housing market including the reduction in turnover/availability, pressures in
the private rented sector and the “cost of living crisis.”
• A rise of 9% in the proportion of households the council had a duty to house from 77% in
2021/22 to 86% in 2022/23. 
• Continued high level of success in tenancy sustainment levels with 91% of homeless
households sustaining their tenancy for over 12 months in 2022/23. 
• Lets to homeless households both by the council and RSL partners have increased by
5% over the year (58% for council and 38% RSLs) despite a 14% fall in the total number
of properties available to let. 
0
500
1000
1500
2000
2500
3000
3500
Homeless Trends
Presentations Duty Outcome Scottish Secure Tenancy
105

Page 106

11 
2.3 Reasons for homelessness 
Figure 2 below provides reasons for homelessness in South Lanarkshire in 2022/23. 
Figure 2 – Reasons for homelessness 
There has been an overall increase in homeless demand locally and nationally. The success
in reducing the backlog in the previous year has minimised the impact of this increase. The
greatest increase has been seen in the areas below;
• Being asked to leave current accommodation continues to be the most common reason
for homelessness in South Lanarkshire (28%) which is a slight increase on 2021/22
level of over 27%.
• Dispute with a violent partner account for 14.08% of all homeless presentations in South
Lanarkshire, a slight increase of less than 1% on 2021/22 level.
• There is an increase in the levels of private rented across subcategories e.g., Landlord
leaving the sector, a 150% increase over 3 years from 1 in 25 households to 1 in 10
since 2020/21. 
2.3.1 By continuing to monitor RRTP data and its links to the Local Child Poverty Action Report,
the partnership has continued to shape services to meet the needs of homeless households,
to reduce the impact of poverty and homelessness, including likelihood of repeat cycles,
aligning with Community Plan priorities. 
2.3.2  Where homelessness cannot be prevented the partnership is keen to ensure needs and
vulnerabilities are understood at the earliest opportunity to mitigate the impact of
homelessness on health and well-being. In the last quarter 55 referrals were made to the
Homelessness Nursing Service of NHS Lanarkshire, providing speeding access to the
specialist nurse led team for assessment, direct support and referral onto specialist services
as required. 
2.4  Prevention of Homelessness 
Figure 3 illustrates the number of cases managed by the council’s Housing Options service
between 2018/19 and 2022/23 and details of the outcome of advice and assistance
provided. 
0% 10% 20% 30% 40%
Asked to Leave
Dispute with Violent
Partner
Loss of Private Rented
Tenancy
Reasons for Homelessness
22/23
21/22
20/21
106

Page 107

12 
Figure 3 – Number of Housing Options cases and outcomes 
• Positively, the increase in the number of housing option cases over the five years of the
plan has also been accompanied by an increase in the proportion of cases where
homelessness has been prevented to 65% in 2022/23. This underlines the positive
difference the Housing Options approach continues to have preventing homelessness in
South Lanarkshire. 
• There has been a significant focus on the development of prevention services over
recent years, including during the period of the pandemic in preparation for an
anticipated increased demand on this important first response to emerging housing need
and risks. 
2.5 Affordable Housing Supply (Social Rented)
2.5.1 Figure 4 below, provides details of the increase in social rented stock (owned by the council)
across the four localities during 2022/23, RSL figures cannot be included until the Scottish
Government Output report is published later.   
Figure 4 – Total Social Rented Housing Supply by SLC (non-sheltered) 
Description Clydesdale East
Kilbride Hamilton Rutherglen/
Cambuslang
South
Lanarkshire
RRTP Baseline
(2018/19) 6,077 6,261 10,970 6,674 29,982
2022/23 SLC
additions  7 92 79 55 233
Total 6,177 6,686 11,250 7,149 31,262    
• Throughout the fourth year of the RRTP and despite the challenges to the construction
industry due to Covid-19, the council and its’ Registered Social Landlord partners have
continued to increase the number of affordable homes for social rent across South
Lanarkshire. 
0
200
400
600
800
1000
1200
2020/2021 2021/2022 2022/2023
Housing Options Cases and Outcomes
Housing Options Cases
Cases Resulting in Homelessness Presentation
Cases Where Homelessness was Prevented
107

Page 108

13 
• In the 2022/23, a total of 233 additional affordable homes were delivered by South
Lanarkshire Council with 27% designed to meet the needs of those with particular needs,
including wheelchair users. 
2.6 Temporary Accommodation 
Figure 5 below provides details of the supply of mainstream (self-contained furnished
accommodation) by locality over the period since the RRTP was established.   
Figure 5 – Breakdown of mainstream temporary accommodation units by locality. 
• In addition to the council’s core temporary accommodation provision, self-contained
furnished properties, ordinary homes across our communities, additional congregate
living accommodation compliments the portfolio. This ensures immediate housing needs
can be met, on a 24-hour 7 day per week basis. The council’s First Stop/Rapid Access
Accommodation provides 61 units of safe, welcoming accommodation with staff providing
appropriate assistance and support. There are also 49 units of specialist supported
accommodation and 26 units of refuge accommodation through Women’s Aid. 
• The greatest increase in temporary accommodation placements has occurred in relation
to B&B usage which has increased by 89.8% since the same period last year, albeit
starting from a very low level of only 30 placements during the course of 2022/23.  This is
as a result of increased demand for temporary accommodation and the impact of severe
weather over winter months which required significant use of properties to decant tenants
and less lets available overall despite % lets to unintentionally homeless households
increasing and the unusually high lets in in 2021/22 due to the 657 new build properties in
the year.  
2.6.1 Following a review of Temporary Accommodation undertaken during 2021/22 a Temporary
Accommodation Strategic Plan was developed in 2022/23. This strategy and associated
planning tool have aided: 
- modelling supply to meet varying need and unprecedented increase in demand 
0
100
200
300
400
500
600
700
800
RRTP Baseline 2019/20 2020/21 2021/22 22/23
Clydesdale East Kilbride
Hamilton Camuslang/ Rutherglen
Total
108

Page 109

14 
- consideration on the Councils approach, resulting in the decision to close Lindsay House
and re-locate to separate sites East Kilbride First Stop provision and the required level of
specialist supported accommodation, to modern appropriate accommodation 
- A more robust process for continual monitoring and review of temporary accommodation
requirements 
2.6.2 The process of “flipping” temporary units to Scottish Secure Tenancies has continued, with
105 units having been converted to a permanent home for homeless households since the
implementation of the RRTP in 2019 with a focus on planning for longer term cases.
Case Study: Flipped Tenancy 
A service user who had mobility issues and suffered from poor mental health had settled
and was doing very well in their temporary furnished flat. Their occupational therapist had
assessed that the property was medically suitable and the following discussions the
property was converted to a permanent settled home. This alleviated the stress of another
move and the challenge of identifying a permanent tenancy that would meet the
applicants’ medical needs. 
Quote from Service User: Flipped Tenancy 
“…thrilled to keep the temporary accommodation and happy in the tenancy.” 
2.6.3 Figure 6 provides a comparison of the average number of days spent in temporary furnished
accommodation (excluding First Stop, Supported) between 2019 (RRTP baseline position)
and 2022/23 
South Lanarkshire Council’s temporary accommodation planning, and monitoring processes
have ensured consistent provision of suitable temporary accommodation with any use of
unsuitable options such as bed and breakfast being minimal and very short term, there has
therefore been no breaches of the Unsuitable Accommodation Order to report.  Although this
has been increasingly challenging over the last year with the increase in demand for
temporary accommodation requiring significant increase in use of bed and breakfast
accommodation, conservation of the optimal use mainstream temporary accommodation is a
foremost consideration of the council. 
109

Page 110

15 
Figure 6 – Average number of days spent in temporary furnished accommodation by Locality. 
• The South Lanarkshire average number of days spent in self-contained temporary
furnished accommodation decreased by 20% from 226 in 2020/21 to 181 days in
2021/22 and is now decreased a further 4% in 2022/23 to 174 days at the lowest point
since the RRTP was approved.
• The average time spent in temporary furnished accommodation varies significantly by
area, from 108 days in Clydesdale to 232 days in East Kilbride. The South Lanarkshire
average being 174 days. This is due to higher demand and greater pressure on
accommodation in more urban localities. Across all temporary accommodation types the
average length of stay was 95.7 days.
2.6.4 At the end of 2022/23 a 65% reduction in homeless households living in temporary
accommodation for more than 12 months has been secured since the beginning of the
RRTP. This underlines the positive impact which the partnership is having and allows a
positive projection to achieving an end to long-term homelessness in South Lanarkshire
within the five-year timescale of the RRTP. Reducing long term homelessness numbers is a
key area of focus for partners despite the challenging context and progress in relation to this. 
2.7 Repeat Homelessness
2.7.1 During 2022/23, there has been a decrease in the proportion of repeat homelessness cases
compared with the previous year from 5.6% in 2021/22 to 3.6% in 2022/23. There continues
to be an increased focus on support, particularly for those with complex needs, which
contributes to improvements in tenancy sustainment and prevention of repeat
homelessness. Analysis of repeat homelessness is continuous informing future service
development. 
Relatively low levels of rough sleeping continue to be reported across South Lanarkshire,
from 69 reported instances during 2021/22 to 25 instances reported during 2022/23 a 64%
decrease. All actions developed in the Rough Sleeping Action Plan in 2021/22 are now
0 50 100 150 200 250 300 350
South Lanarkshire
East Kilbride
Rutherglen/
Cambuslang
Hamilton
Clydesdale
RRTP Baseline 2019/20 2021/21 2021/22 2022/23
110

Page 111

16 
complete, this included introducing online reporting, promotion of 24-hour service availability
in response to urgent homelessness contributing to successful reduction in instances of
rough sleeping. However, this remains an area of focus into 2023/24.
3. Year Four progress
3.1 Tackling homelessness requires a shared commitment from a range of agencies and
partners in the public, private and third sectors. As such the RRTP was co-produced and
annually reviewed with partners and stakeholders involved in the decision-making process
for agreeing ongoing priority actions contained within the plan.
3.2 Reviewing the plan 
The Homelessness Strategy Group has responsibility for monitoring progress in relation to
the RRTP and overseeing the annual review, including the evaluation of progress against
actions and measures set out within the action plan and consideration of the
appropriateness of the actions identified. 
During the process of reviewing the fourth year of the RRTP, it has been recognised that
progress has built upon the existing foundations of strong partnerships, and this will ensure
the continuation and further development of key areas of work, particularly in light of the
continually challenging environment. The group note good progress has been made over the
last four years meeting key objectives whilst adapting to the impact of the public health
emergency, and a solid structure is in place enabling the achievement of positive outcomes. 
3.3 Review Scorecard 
To monitor progress against each of the five priority objectives in the RRTP, a traffic light
scoring system is used. Attached to the priorities are 53 indicators comprising of 33 actions
and 20 measures. A further category of blue was an addition to the second annual review
and highlights actions which have been completed. Figure 7 below provides a summary of
the position in relation to the progress made towards the achievement of the five priority
objectives of the RRTP during 2022/23. Over 92% of indicators were either achieved or were
close to target.   
Figure 7: Scorecard
RRTP Scorecard 2022/23 Blue Green Amber Red Grey Total
Prevent homelessness
occurring and significantly
reduce homelessness
1 10 1 2 0 14
Significantly reduce time
spent by households in
temporary accommodation
and minimise moves before
moving to settled homes
0 11 1 0 0 12
Improve and increase the
provision of housing support
for households to live
independently within
communities
1 9 1 0 1 12
Expand the scope and
capacity of our Housing First
approach to be the first
response for households with
multiple complex needs
0 9 0 0 1 10
111

Page 112

17 
Enhance integration and
partnership working to embed
RRTP through a whole
systems approach
1 4 0 0 0 5
All 3 43 3 2 2 53 
Colour Progress
Blue Complete
Green Achieved/on target
Amber Minor slippage
Red Significantly off target
Grey Report Later/Contextual   
3.4 Key Highlights of Progress Made in Year 4
Detailed below are key highlights of the progress that has been made towards delivering the
actions and measures outlined for Year four for each of the five RRTP priority objectives.
Some examples of service user feedback and case studies have also been provided to
demonstrate the positive outcomes achieved.
A summary of progress made in Year four, in relation to all actions and measures detailed in
the RRTP Action Plan is also attached as Appendix 1. 
Priority Objective 1: Prevent homelessness occurring and significantly reduce
homelessness
• Although early intervention and integrated housing options has continued in line with national
trends there has been an increase in the levels of homelessness. Success in reducing the
backlog over the previous year can however be considered to have limited the impact of this
increase. 
• A further improvement of availability in affordable housing has been seen in 2022/23 with a
total of 233 delivered (this included 57 purchased through the Council’s Open Market
Purchase Scheme).
• There has been a continued partnership approach with Right There to support access and
sustainability of tenancies in the Private Rented Sector with the continuation of the Innovation
Fund. In 2022/23 there were 24 people helped through the scheme. 
• In 2022/23 there was a continued focus on early detection of housing risk factors and
interventions to prevent homelessness where possible through the Integrated Housing Options
model. Despite an increase in the demand for the service 65% of advice cases were closed
with support being provided preventing homelessness from occurring. 
• Improved service pathways developed between the Integrated Housing Options Team and
Adult Employability Services supporting adults at risk of homelessness to access education,
training, or employment.
• Ongoing pathway approach to support those affected by domestic abuse with a view to
preventing homelessness wherever possible. With 17 people supported through the year by a
part time post the aim is to expand this service through 2023/24 with additional funding from
the Alcohol and Drug Partnership. 
• Ongoing joint approach to supporting young people moving on from a care setting through
pathway plan process and additional support available via Social Work’s Throughcare and
Aftercare team in close partnership with Housing Services.
112

Page 113

18 
• A homelessness awareness video co-produced with service users details journeys through
homelessness was shared with partners including a service user group. The feedback from all
service users who viewed the video was very positive noting this was an informative resource
relating to homelessness prevention and homelessness services. The video is now being
shared in Education, wider Council Departments, Women’s Aid and Commissioned Services
to share with those at risk of or actually homeless across the partnership. 
Case Study: Innovation Fund 
We received a call from Lanark housing service looking for some advice regarding a male single
parent that had contacted housing after the sudden death of his wife.
He was living in a private rented property with his 12-year-old son, and both were finding it difficult
living there due to his wife passing away in the property. This was very traumatic for them and
was affecting their mental health. The father made reference to preferring to be homeless than
continuing to reside at the property due to the trauma he and his son had faced.
The client had identified an alternative property through his current private sector landlord but
didn’t have the finances to pay the deposit required to secure the property.
Unfortunately, the landlord would not accept the standard guarantee bond for the deposit,
however we were able to support through the Innovation Fund and arranged for a cash payment
to be paid directly into the landlord's account facilitating a move within 2 weeks. We were also
able to help with decoration cost for the son’s bedroom to support him to settle well in his new
tenancy by accessing a starter pack fund.
The client expressed his gratitude to the service and explained that without the help of Right
There , there would have been no way he would have been able to afford the deposit required to
move and that they have both settled in well to their new home which has had a significant impact
on the child’s welfare, education and both father and son’s general wellbeing. 
Case Study: Domestic Abuse Housing Pathway 
AM was first presented at MARAC in September 2020 with her partner. They had two homeless
applications prior to this date for fleeing the threat of external violence. Anti-social behaviour
complaints from their tenancy stated the perpetrator was regularly arguing or violent towards
neighbours and the victim. Since 2019 there were more than five complaints concerned for the
welfare of the victim. 
The perpetrator was imprisoned May 2021 for domestic abuse offences. AM made it clear to
Housing Officer that once perpetrator was released from prison, she did not wish to continue the
relationship. AM indicated that she wished to remain in the tenancy so the Housing Officer tried
various routes to seek his removal from the joint tenancy. This was not successful. The perpetrator
refused to sign over the tenancy even with the offer of alternative accommodation on his release.
Legal services were unable to assist as he had joint rights to the tenancy.
The perpetrator was released from prison May 2022 and headed straight for their tenancy where it
was suspected the domestic abuse, including financially abuse, restarted. 
113

Page 114

19 
The following week the victim attended an appointment in a council office and the perpetrator found
her there and assaulted her. He was arrested and released with bail conditions. AM presented to
the out of hours service that evening with Police, she was very subdued and did not speak to staff.
Later the following day she was found to be in possession of an unknown substance and was asked
to leave and alternative accommodated had to be sourced. 
AM began to engage with Social Work, community addictions team, Women’s Aid and ASSIST. She
was also diagnosed as schizophrenic. 
The Housing Officer completed a domestic abuse Housing Pathway with AM. She has since been
rehoused in another locality, a safe distance away from her previous joint tenancy where he
continues to reside. This took 239 days from the date she applied as homeless to the date her new
tenancy started. Outreach housing support service has been put in place and she engages well with
this and the other agencies. 
Priority Objective 3: Improve and increase the provision of housing support for
households to live independently within communities  
• Tenancy sustainment levels remain high at 92% for overall tenancies and 91% for previously
homeless households. The HomeStart service contributes to this positive position with
continued focus on assisting new council tenants, (in particular those at most risk of or who
have experienced homelessness), to sustain their tenancy.  In the last year, the HomeStart
service provided both practical assistance and advice to 1235 new tenants helping set up a
comfortable home. 
• Improved integration of housing support services - Partnership work with Salvation Army,
Turning Point, Blue Triangle Housing Association and Right There has supported the
continued development of the pathway planning approach which ensures the provision of 
Priority Objective 2: Significantly reduce time spent by households in
temporary accommodation and minimise moves before moving to a settled
home 
• A further 4% reduction in the number of households who have spent more than 12 months in
temporary accommodation. 
•  A 65% reduction in long term homelessness from 120 in 2019/20, 56 in 2020/21, 42 in
2021/22 and 40 in 2022/23.
•  A 4% reduction in time spent in temporary accommodation from an average of 181 days in
2021/22 to an average of 174 days in 2022/23. This not only reflects improvements on a very
challenging year but sees a 7% reduction compared against pre-pandemic levels.
• An increase in the number of temporary tenancies which were ‘flipped’ to a Scottish Secure
Tenancy, providing the homeless household with a permanent home, and avoiding the need
for the disruption of further moves. A total of 105 tenancies have been flipped since 2019/20 
• The Council and its HomeFinder Registered Social Landlord (RSL) partners continue to
maximise the percentage of lets to be directed to those on the Homeless List. In 2022/23, 58%
of council properties were let to homeless applicants. HomeFinder RSLs collectively let 38% of
vacant properties to homeless households. 
• There continues to be a low incidence of rough sleeping in South Lanarkshire with a 60%
reduction in those who advised they had slept rough the night before presenting as homeless
over the lifetime of the plan. 
114

Page 115

20 
Priority Objective 3: Improve and increase the provision of housing support for
households to live independently within communities  
innovative housing support projects across South Lanarkshire. All congregate living temporary
accommodation projects offer quality, person centred support in a “psychologically informed
environment.” Support is designed to build personal resilience, strengthen social networks, and
empower, including increasing life skills to support tenancy sustainment. An Intensive Floating
Support service is also provided to households with multiple and complex needs.
• A dedicated focus, with specialist posts, deliver a positive Personal Housing Planning
approach for vulnerable groups including women experiencing domestic abuse, care leavers,
and the continued implementation of SHORE standards for the prevention of homelessness on
release from prison remains.
• Ongoing partnership approach to meeting the needs of women at risk of homelessness due to
gender based violence. Housing represented on Co-corporate GBV partnership group in
addition to Housing subgroup with purpose of raising awareness of issue, supporting learning
and development across workforce, and delivering person centred pathway plans to explore all
housing options and secure suitable sustainable housing outcomes. 
• The complex need case discussion panel has continued through 2022/23 with a planned
calendar of meetings and flexibility for emergency panels as required. The focus has been on
encouraging the sharing of knowledge, skills, and insight from partners in Health and Social
Work with the panel to target interventions and improve the quality of life for clients and reduce
further homelessness and the impact of homelessness as far as possible.
• Service users were offered the opportunity to attend Harm Reduction training through the
Service User Engagement programme resulting in positive feedback enabling those who
attending to use their skills to assist their peers.
• The Wellbeing Web was introduced in 2022/23 to enable better understanding and monitoring
of housing support need and outcomes achieved. The service supported 485 clients over the
course of the year achieving 81.8% improvement against assessed support needs, this
includes managing a home, addiction, mental health, and community connections. 
Case Study: Complex Case Panel 
Service user presented as homeless due to being asked to leave by his Mum. He had a diagnosis
of ADHD and his behaviours in the family home were causing distress to his two younger sisters.
His Mum felt she could no longer cope with him in the house but still wanted to provide a level of
support.
Housing Support Officer assessment lead onto referral for discussion at the complex need case
panel. Abusive behaviour was a key concern. 
A meeting was arranged and the Housing Support Officer, Homeless Team Leader, Social Worker,
representation from Blue Triangle Intensive Floating Support, Health & Homeless and Right There
discussed an approach to meeting accommodation and support needs. 
It was considered abusive behaviours seemed linked to the ask to move on from the family home,
a feeling of isolation and placement out with the area he had grown up in.
The panel agreed the following actions: -
• Identify a temporary furnished flat in close proximity to his family. 
Referral onto outreach support service and Social Work to look at providing and funding
appropriate service for additional support needs.
115

Page 116

21 
• Housing Support Officer to work with client to complete detailed housing plan so we could
establish the best areas to be rehoused permanently. 
Following the agreed plan of action, a Temporary Furnished Flat was identified 0.3 miles from
Mum’s house. Joint discussion and support in place lead to agreement on temporary return to the
family home until this property was available to move into solving immediate accommodation
concerns. A referral was made to Right There and a male support worker picked up the case. Social
Work continued to work with the family in considering the most appropriate supports. 
After moving into the Temporary Furnished Flat he settled quickly. The family relationships improved
greatly as he had his own space but Mum close by for support. Across the partnership support was
delivered and well received on a voluntary basis. After five months of a settled position, it was
agreed to ‘flip’ the tenancy to a Scottish secure tenancy.
The positive outcomes for this case: -
• Multi agency approach met support needs.
• Person centred housing plan identified most appropriate accommodation option.
• Appropriate offer of housing through flipping tenancy preventing further disruption.
• Positive relationships established should there be any future need for advice or support. 
Priority Objective 4: Expand the scope and capacity of our Housing First
approach to be the first response for households with multiple complex needs
• South Lanarkshire Council in partnership with The Salvation Army continue to work to deliver
Housing First support to individuals with multiple complex needs. 
• In 2022/23 a further 3 individuals were supported through Housing First totalling 36
supported since the service began.  Improvement in outcomes for individuals supported by
Housing First has been recorded in areas such as a 22% increase in engagement around
drug & alcohol use, in turn a 5% decrease in offending behaviour, 12% increase in motivation
& taking responsibility, 3% increase in management of tenancies and 3% increase in self-
care.
• As the individual learns they gradually become more self-reliant; this is maximised by the
number of hours staff were available to support service users by arranging for staggered
starts, shift working, and/or encouraging staff to work flexible hours.
• Continued growth of the partnership Community Harm Reduction Hub enabling those
supported by the Housing First service to access group work, harm reduction intervention,
psychosocial implementation and build on life skills.
• Further support through Health and Wellbeing began in 2022/23 with the implementation of a
walking group for Housing First service users.
• Progress made over last year with prioritising access to general medical and universal health
screening services for homeless people particularly positive partnership with community links
health team. During 2023/24 work will continue to explore opportunities to expand and
evidence prevention activity through priority access. 
1st 
116

Page 117

22 
Service User Feedback/Comments: Housing First Service 
“Thanks to everyone at Housing 1st for their help and support over the last few years. I’d have
been lost without all of you, they are all diamonds yourself included so thank you, you all do an
amazing job”.
“Thanks very much for everything that you’ve done for me, guiding me.  If it wasn’t for you, I
wouldn’t have come this far”. 
“This Service has saved me, like mentally and physically. There is nothing that staff wouldn’t do
to support me and are always there to make sure I am ok.  My treatment can take it out of me
sometimes but just knowing that someone cares make it all worthwhile. I feel stable in my home
and feel as though this is my time.”
“The staff helped me with cooking.”
“I hide away, and my worker always makes sure that I get the things I need. I struggle but always
tried to act as though I was managing.  It’s good to have people know me”.
“If it wasn’t for staff and this Service I would probably be in and out of hostels and prison.  This is
the longest that I have not spent time in prison. My house looks amazing.”
“I have been going to the groups at the HUB, never usually go anywhere as I struggle with people.
It is really fun and even get to meet new people”.
“Yesterday, I bought my own furniture. Some I have to do things too, but it is mine and felt really
good”. 
Priority Objective 5: Enhance integration and partnership working to
embed RRTP through a whole systems approach
• Regular update on partner services is provided to the Homelessness Strategy Group
which improves knowledge and understanding of the role of each partner and
promotes best practice and consistency for governance of the plan. 
• The Homelessness Strategy played an active role in shaping the homelessness
content of the new Local Housing Strategy (LHS) 2022 to 2077 which was approved in
November 2022.
• Close partnership working continues to develop and progress specific ‘Directions’
within the Strategic Commissioning Plan 2022-25. Progress made over last year
includes positive partnership with community links health team. During 2023/24 work
will continue to explore opportunities to expand and evidence prevention activity
through priority access. Evaluation will be undertaken by end of 2023 which will allow
sufficient time to take account of the of legislation and statutory guidance on new
prevention of homelessness duties for public bodies in the forthcoming Housing Bill. 
• The council has also successfully agreed an information sharing arrangement with the
National Health Service enabling data trend analysis to understand links between
health and homelessness data with a view to aiding preventative activity. 
• Data sharing on an individual basis in relation to household with children has been re-
established to ensure the impact of homelessness is minimised 
117

Page 118

23 
3.5 Key Areas for Improvement
3.5.1 Progress is being made with 92% of indicators on the RRTP Action Plan being complete, on
target or close to target, however there are three indicators across the five priority objectives
that have been allocated an amber status and two which are now red and these will continue
to be areas of focus and improvement during 2023/24. 
3.5.2 Table A below provides the context as to why they continue to be monitored. 
Table A – Red and Amber Measures
Reference Measure Comment
M1.1 The number of homeless
Presentations
This action, in line with national trends, the
demand for homelessness services increased
significantly in the year, a 17% increase. This
trend is likely to continue in light of external
factors including socio-economic
circumstances. It is therefore considered
necessary to increase RRTP measure from a
target to reduce homelessness by 10%-20%
and replaced (see 4.3 Table B – Proposed
Amendments below)
M1.2 Level of Homeless
Households (homelessness
caseload at year end)
As above the spike in demand for homeless
services has resulted in the measure now being
red and the likelihood of meeting the target
unlikely. Nationally homeless applications are at
the highest since collections began in 2002,
with an increase of 29% compared to 2019
reported by the Scottish Government in January
2023. It is therefore proposed that this measure
will be removed from the RRTP and replaced
(see 4.3 Table B – Proposed Amendments
below)
M1.5 Increase the number of
landlord accredited
properties
Through the Private Landlord Forum, private
landlords are encouraged to take up training
offered by Landlord Accreditation Scotland. This
measure will continue to be progressed during
2023/24.
M2.3 Percentage of homeless
households provided with a
Scottish Secure Tenancy
While performance reduced during the year in
the face of a number of external challenges
there has been a 4% improvement when
considered over the last 2 years. There is
confidence that over the next year the
performance will improve further.
M3.1 Number of people accessing
Housing Options
(prevention) services
Slightly under target for 2022/23 however a
positively the proportion of cases where
homelessness has been prevented was 65%.
This underlines the positive difference the
Housing Options approach continues to have on
preventing homelessness in South Lanarkshire.
118

Page 119

24 
4.  Proposed Changes to Rapid Rehousing Transition Plan (RRTP)
4.1 The annual review provides the opportunity to assess and report on the progress made
against each of the actions and measures contained within the plan. It also allows for a
general re-examination of the RRTP, to ensure that the objectives, actions, and measures
identified, remain appropriate, relevant, and measurable.
4.2 During the annual review one proposed revised action has been identified. Details of the
proposed change are detailed in Table B below. Following approval, the revision will be
incorporated into the RRTP action plan for 2023/24. 
4.3 In addition, several minor amendments have been made throughout the action plan to
measures and actions to reflect changes in processes or updated terminology. These do not
impact on the outcomes reported; however, help ensure the RRTP remains up to date and
clear in how it will deliver the intended outcomes. 
Table B – Proposed Amendments
Ref. Current action/measure Status Ref. Proposed replacement
action/measure (where
appropriate)
M1.1A The number of homeless
Presentations
Red M1.1 It is looking increasingly
unlikely that the target to
reduce by 10%-20% will be
met due to the increasing
pressures from external
factors out with the control
of the authority. Although
the focus on prevention
work will continue. 
It is proposed therefore that
the target for this measure
be amended to “maintain or
reduce the level of
homeless presentations in
the year.”
M1.2A Level of Homeless
Households
(homelessness caseload
at year end)
Red M1.2 It is looking increasingly
unlikely that the target to
reduce by 10%-20% will be
met due to the increasing
pressures from external
factors out with the control
of the authority. 
Although the focus on
prevention work will
continue, it is proposed that
the target for this measure
be amended to “maintain or
reduce level of
homelessness.” 
5. Priorities for 2023/24 
5.1 The review also provides an opportunity to set out the key priorities to be progressed over
the next year of the plan. 
119

Page 120

25 
5.2 A summary of these to be progressed during 2023/24 are detailed below: -
• Continue to deliver affordable homes for social rent.
• Ongoing focus on prevention of homelessness, particularly in relation to households with
children through continuing to maximise social lets to homeless households and
continued support to access and sustain in relation to the private sector.
• Continue to reduce long-term homelessness.
• Further progress the homelessness directions contained within the Strategic
Commissioning Plan.
• Continue to maintain and develop links to the Local Child Poverty Action Plan.
• Monitor implementation of specific pathways for victims of domestic abuse, with
additional of ADP funded specialist support.
• Continue to work with Social Work Resource to develop housing options for young care
leavers, including supported accommodation model.
• Further develop the approach for individuals released from prison by expanding the
service by linking in with female prisons.
• Continue to focus on pathways and a Housing Options approach for young people.
• Continue to develop, promote, and monitor the Private Sector Access and Sustainment
Service.
• Review the councils Homestart service for new tenants for decision on future and to
capture learning to inform future service development.
• Continue to expand councils Housing First approach.
• Continue to convert temporary units to permanent accommodation.
• Complete review of support service provision and identify proposals for implementation
of revised approach to commission and delivery of trauma informed support services.
• Continue the focus on joined up approaches and avoid long-term duplication of services.
especially with health and social care partnerships and community justice.  
• Review of Commissioned Services exploring opportunities of partnership working for
efficiencies and to lever in funding that will add value to existing homelessness services.
• Further progress ongoing work with RSL partners to expand Homefinder Common
Housing Register. 
5.3 Funding the RRTP during 2023/24  
Scottish Government Funding
During 2022/23, the Scottish Government’s Ending Homelessness Together Fund confirmed
a funding allocation of £460,892 for year five for South Lanarkshire. Partners agreed that this
would be used to further embed and progress the following RRTP actions: -
• The expansion of specialist support services currently provided by Blue Triangle
Housing Association for intensive floating support services to individuals with complex
needs.
• Continuation of funding dedicated officer posts to support victims of domestic abuse.
• Continued support of the Private Sector Access and Sustainment Service and
expansion of the Innovation Fund administered by Right There.
• Continuation of funding dedicated officer posts to support young care leavers.
• Continuation of funding dedicated officer to support SHORE standards for individuals
entering and leaving prison.
• The continuation of the Housing First programme. 
120

Page 121

26 
Other Funding Sources
The Homelessness Strategy Group actively consider other potential funding routes to meet
future resourcing requirements of the RRTP. Partners have committed to work
collaboratively to identify funding opportunities in 2023/24.
ADP have provided £40k to support delivery of SLC’s RRTP in relation to funding two part-
time posts within Blue Triangle Housing Association (BTHA) to support vulnerable women
with addictions.
The posts have been advertised and recruitment is now complete for one and underway for
the second. It is anticipated that the posts will provide valuable support to vulnerable women
with addictions to enable them to engage with services and to develop the necessary
knowledge and skills to successfully manage their home and sustain settled housing.
There is a bid being submitted jointly with BTHA to Young Scot. If successful, this bid would
fund a post to support young people in South Lanarkshire. It is hoped the funding could also
give the opportunity to work with New College Lanarkshire to develop an accredited course
to provide young people with basic life skills that are essential in setting up a home including
cooking and budgeting. 
Another potential funding source is also being pursued jointly with BTHA in a bid to Tesco fur
a small sum to fund an infographic and short video to assist in setting up a home. This will be
aimed again at young people however could be utilised for all new tenants. 
121

Page 122

27 
Appendix 1: RRTP Action Plan 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
RRTP Measures Target RRTP
Baseline
Progress
2022/23 Lead
M1.1 Number of homeless presentations Maintain or reduce 1,928 2502  HTR
M1.2 Level of Homeless Households (homelessness
caseload at year end)
Maintain or reduce 892 1331  HTR
M1.3 Number of affordable homes added to the housing
supply (new and OMP)
Annual target will be set and
detailed in the Strategic Local
Programme Agreement,
developed between SLC and
the Scottish Government
RSL 283 To be reported
later
HTR / RSL
SLC 193 233
M1.4 New supply affordable housing suitable to meet
particular needs 
Annual target will be set and
detailed in the Strategic Local
Programme Agreement,
developed between SLC and
the Scottish Government
170 63
HTR / RSL
M1.5 Increase the number of accredited landlord properties +9% from LHS baseline 1,068 942 HTR
M1.6 Number of homeless households whose housing
needs are met in the private rented sector
Increase 2020/21 50  39 HTR 
122

Page 123

28 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
Actions Target/Milestone Progress in 2022/23 Lead
A1.1  Set housing supply targets for new
build properties and ensure
contribution to meeting
homelessness needs are
considered in the planning process
Aligned with Strategic
Housing Investment Plan
and the Local Housing
Strategy. Annual target
will be set and detailed in
the Strategic Local
Programme Agreement,
developed between SLC
and the Scottish
Government.
New build programme progressing in accordance
with South Lanarkshire Strategic Housing
Investment Plan 2022-27 approved by Housing
and Technical Resources Committee in
November 2021.
HTR/RSL
A1.2 Increase number of properties
acquired through Open Market
Purchase (OMP Scheme) to
support conversion of temporary
accommodation to secure
tenancies and rehousing in
pressure areas
Annual target to be
agreed in Strategic
Housing Investment
Plan. 
57(53 - 21/22) additional council homes were
purchased through the council’s framework for
Open Market Purchase Scheme. The scope of
the was extended follow approval at HTR
committee on 14/12/2022 to allow for properties
that have been empty for a period of more than
12 months to be considered for purchase without
being actively marketed for sale.
The changes also allow owners of former council
properties to contact the council and for direct
discussion to take place with the owner
themselves and the council to engage with
private landlords who are already leasing their
property to the council on the potential purchase
of this. 
HTR
123

Page 124

29 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
Actions Target/Milestone Progress in 2022/23 Lead
A1.3 Continue to develop and promote
the landlord accreditation scheme
Deliver two private
landlord forums per
annum in partnership
with the Landlord
Accreditation Scotland 
South Lanarkshire Council has continued to
promote the accreditation scheme at forum
meetings and the Council’s websites. There are
942 registered landlords in South Lanarkshire.
HTR
A1.4 Provide funding to incentivise
landlords to access accreditation
and training from Landlord
Accreditation Scotland
Annual fees provided and
accreditation monitored
The council continues to fund and work in
partnership with Landlord Accreditation Scotland
who provide training to private landlords. The
accreditation scheme is free to join and once
accredited, landlords are required to attend one
training session per year. 
HTR
A1.5A Expand the Private Sector Access
and Sustainment Service
administered by Right There
Service Expanded – by
DATE 
Monitor effectiveness of
increased capacity and
widening scope of
service delivery
Right There (formally Ypeople) provide expert
advice and assistance, assessing housing
needs, risk to sustainment in particular financial
risk and assist households access and sustain
private sector accommodation. 
In 2022/23 £3,500 of financial assistance was
provided through Guarantee Bonds in place of a
cash deposit
HTR /Right
There
A1.6A Deliver and continue to develop
Private Sector Innovation Fund
administered by Right There -
providing financial support to
private rented tenants to prevent
homelessness. 
Service continues to be
delivered in accordance
with – commissioning
contract. 
The Innovation Fund administered by Right
There's Private Sector Access and Sustainment
Fund (PSASS), has seen increased demand. A
total of £15705.50 has been administered in
financial assistance. 
HTR/ Right
There 
124

Page 125

30 
Priority Objective 1: Prevent homelessness occurring and significantly reduce homelessness
Actions Target/Milestone Progress in 2022/23 Lead
A1.7A Continue to develop and implement
approaches to prevent youth
homelessness, with a particular
focus on pathway approach to
meeting the needs of care
experienced young people. 
Continue to deliver
personalised and
planned approach to
provision of housing for
young people leaving
care. 
New Pathway Approach
implemented by March
2023 
This year we continued our Housing Pathways
approach for all care experienced young people
within the Throughcare system. Partners set a
target in the year for 95% of applicants in the
throughcare route to have a person-centred
housing pathway agreement in place. 
HTR
A1.8 Continue to develop and implement
approaches to support victims of
domestic abuse and prevent
homelessness. 
Enhance the
development of the
housing pathway for
victims of domestic
abuse and considering
legislative changes and
good practice 
During 2022/23 we have continued to provide
housing representation at every MARAC, sharing
relevant information on victims and perpetrators
and taking away appropriate actions agreed at
each meeting with the goal of maximising safety
planning to safeguard victims. 
125

Page 126

31 
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes
RRTP Measures Target RRTP
Baseline
Progress
2022/23 Lead
M2.1 Temporary Accommodation Supply Complete review of options
for the provision of temporary
accommodation in 2022/23 in
conjunction with
implementation of the
Temporary Accommodation
Strategic Plan to maintain
optimum supply.
Units 530 Units 609  HTR
M2.2 Percentage of social housing allocated to homeless
households by all social housing providers in South
Lanarkshire
50-60%
Set target subject to annual
review
49.2% SLC
29.4% RSL
58.14%
37.90%
HTR/RSL
M2.3 Percentage of homeless households provided with a
Scottish Secure Tenancy (SST)
Maintain/improve on LHS
baseline of 61.2%
61.2% 57.77% HTR
M2.4 Percentage of former homeless households provided
with an SST that maintain their home for more than 12
months
Maintain/improve on LHS
baseline of 88%
88% 91% HTR
M2.5 Average time spent in temporary accommodation Reduce from 192 days 192 days 173.72 HTR
M2.6 Number of temporary accommodation units converted
to SST
Up to 100 units converted
over 5-year period 
30 units
(105 in total)
HTR
126

Page 127

32 
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes
RRTP Measures Target RRTP
Baseline
Progress
2022/23 Lead
M2.7 Percentage of all homeless presentations which are
repeated (within 12 months)
Reduce to less than 3% 4.5% 3.6% HTR
M2.8 Number of homeless households who spend more
than 12 months in temporary accommodation
Reduce by 50% on baseline  120 40 HTR   
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes 
Actions Target/Milestone Progress in 2022/23 Lead
A2.1A Maximise the potential for
converting temporary
accommodation to a Scottish
Secure Tenancy where the
property meets the needs of the
household
Review best practice and
identify suitable
households and units
30 units have been flipped during 2022/23. This
continues to be an area of strategic focus and
Area Teams continue to achieve a balance
between flipping and keeping quality temporary
accommodation in the right places.
HTR
A2.2 Increase percentage of allocations
to homeless households 
SLC aligned with Local
Letting Plans. 
RSL partners as per
agreed targets
The council continues to allocate between 50%
and 60% of lets to homeless households. Some
RSL HomeFinder partners were below their
individual target. Cumulatively RSL HomeFinder
partners allocated 38% of vacant properties to
homeless households in 2022/23. To support
delivery of the RRTP, the council continues to
work with RSLs to secure the necessary  
proportion of their vacant properties are directed
HTR
127

Page 128

33 
towards meeting the needs of homeless
households during the year. 
Priority Objective 2: Significantly reduce time spent by households in temporary accommodation and minimise moves before
moving to settled homes 
Actions Target/Milestone Progress in 2022/23 Lead
A2.3 Review number of properties
currently used as temporary
accommodation in line with
demand
Reconfigure targets for
temporary
accommodation provision
in 2022/23 subject to
analysis confirmed in
Temporary
Accommodation
Strategic Plan
The development of a Temporary
Accommodation Strategic Plan completed which
included development of a modelling tool for
forecasting targets for temporary accommodation
beyond 2024. See section 2.4 for details. 
Annualised target for number of properties used
as temporary accommodation to be set based
upon plan from 2023/24 
HTR
A2.4 Regularly review rent charges for
temporary accommodation to
ensure it remains a financially
viable option for all homeless
households. 
Aligned with
Homelessness Business
Plan 
Further work to ensure rent affordability
opportunity being progressed as part of the
implementation Temporary Accommodation
Strategic Plan.
HTR 
128

Page 129

34 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
RRTP Measures Target RRTP
Baseline
Progress
2022/23 Lead
M3.1 Number of people accessing Housing Options
(prevention) services
1,000 964 972 HTR
M3.2A Percentage of homeless households who require
support, provided with Housing Support Officer
assistance
Maintain at 100% 100% 100% HTR
M3.3 Percentage of looked after young people accessing
and sustaining accommodation that meets their
needs
Determine baseline 
Increase annually
95% 93% HTR 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2022/23 Lead
A3.1 Increase housing support service
provision to improve homelessness
prevention and support tenancy
sustainment across all tenures. 
Review current service
provision
Range of internal and 3rd sector partners continue
to deliver housing support services, both in
prevention activity and response to
homelessness minimising its impact.
Monitoring of housing support outcomes reflects
positive outcomes, reduced need across all
wellbeing/support need indicators and increasing
tenancy sustainment.
The Wellbeing Web was introduced 2022/23 to
enable SLC to monitor and track progress of
households engaged with Housing Support
Workers.
The impact of the Wellbeing Web recording,
monitoring, and reporting demonstrates the level
HTR
129

Page 130

35 
of housing support needs across SLC,
particularly in relation to provision of supports in
relation to managing the home, finances, mental
and physical health and employment and
education.
The introduction of the Wellbeing Web has
provided an opportunity to understand our
service users needs across localities and the
distance they have travelled to achieve desired
outcomes that will help them sustain a settled
tenancy. 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2022/23 Lead
A3.2 Increase provision of support from
all services to support new
tenancies, including improvements
to housing starter/furnishing packs
and incentives to encourage uptake
of offers.
Review and develop
Implement and monitor
effectiveness
The HomeStart service was established
permanently during 2021/22. During the year, the
service has continued to assist 1235 new tenants
settle into and sustain their new tenancy through
assessing risk factors such as previous eviction
or homelessness and financial risk, offering
information and advice from benefit entitlement,
employment, and training opportunities to
practical support for example around budgeting,
reducing debts and making community
connections. The service includes provision of
starter pack furniture as required.
HTR
A3.3 Monitor current Housing Options
approach, and ensure adequate
resourcing to meet any future
increase in demand
Annually monitor
resourcing requirements
and report through
annual review
While performance is marginally below the
prevention target the focus on person-centred
approach continues to support positive
outcomes. 
HTR
A3.4 Deliver Housing Options and
homelessness awareness training
Monitor and report  Improved awareness of housing options and
homelessness by secondary school pupils due to HTR
130

Page 131

36 
to young people, targeting high
schools in areas identified with high
homelessness rates amongst
young people
the development of a film that incorporated into
the school curriculum with active participation
from homeless service users. Service users
enjoyed this experience and considered it
valuable to provide an overview of the impact of
homelessness. 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2022/23 Lead
A3.5 Review access to Scottish Welfare
Fund with a view to ensuring
effective and appropriate access for
homeless households. 
Complete Review 
Implement any actions
from review
Good partnership working across services with
regular liaison meetings, good communication
and awareness of urgency for homeless
households. SWF team utilised additional funding
to increase support to homeless household aiding
sustainment over the last year. 
HTR
A3.6 Review current provision and need
for outreach housing support and
agree future service arrangements
Complete Review.
Current
services/contracts due to
end and implement
revised arrangements as
result of review
To be reported later
HTR
A3.7 Ensure ‘care experience’ is
identified as a support need for any
young people presenting as
homeless and directed towards
Monitor and report  There have been positive outcomes and
improvements to processes due to effective joint
working between Housing and Social Work. The HTR
131

Page 132

37 
appropriate case managed
pathway. 
joint protocol will continue to be monitored and
reported to senior management annually. 
Use of pathway plan, which compliments with
wider Children’s plan enables comprehensive
person-centred housing and support planning and
delivery. 
Priority Objective 3: Improve and increase provision of housing support for households to live independently within communities
Actions Target/Milestone Progress in 2022/23 Lead
A3.8 Complete a Wellbeing Assessment
for all children and young people
who are homeless
Monitor and report
(annually)
A process for a “request for assistance” is now in
place to highlight affected children both to health
visitors and school nurses. Housing and NHS
Lanarkshire Health Improvement team working
towards development of a process for wellbeing
assessments for children affected by
homelessness through the school nurse service. 
HTR
A3.9 Promote digital inclusion for
households who are homeless
Maximise funding for the
provision of digital
equipment and two year’s
unlimited internet access
for homeless households
Since 2019 108 homeless households and
vulnerable young adults have benefited from the
continued efforts to challenge digital exclusion
through the Bringing IT Home project. Each
household has received a piece of digital
equipment and two years of unlimited internet
access.
HTR 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
RRTP Measures Target RRTP
Baseline
Progress
2022/23 Lead
132

Page 133

38 
M4.1 Number of current households receiving Housing
First Support
Phased increase to 40 3 36 HTR
M4.2A Number of Housing First planning cases handled by
health professional led multi-agency care
management approach. 
Baseline to be established  - See Action
A4.8
HTR/HSCP 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2022/23 Lead
A4.1 Expand Housing First across South
Lanarkshire
40 cases to be
progressed on period of
RRTP - 2019-24
During 2022/23, an additional 3 cases were
included in the programme bringing the total
households who have been supported to 36. 
HTR
A4.2 Evaluate Housing First pathfinders
and increase scale/scope of
approach aligned to case
conference criteria and pathways
approach
Evaluation Report to be
completed
To be reported later HTR
A4.3A Complete development of the
Temporary Accommodation
Implementation of
Temporary
The Temporary Accommodation Strategic Plan
has been developed and annual reviews are
underway to enable a complete understanding of 
133

Page 134

39 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2022/23 Lead
Strategic Plan and progress
implementation
Accommodation Strategic
Plan and reconfiguration
of temporary
accommodation model.
how temporary accommodation is used and how
it can be best developed to meet demand over
the medium and longer term. It has been agreed
that due to the increase in demand on the
homeless service the modelling tool which was
developed in support of the plan in 2021/22 will
be redone to inform the future provision of
temporary accommodation. 
A4.4 Work with Scottish Prison Service
and Addiewell prison to implement
SHORE standards for people
entering and exiting prison,
including a priority focus for short-
sentence prisoners on remand.
Explore additional options for
dedicated staff resources
Implementation plan
agreed for
implementation from
2020/21
The liberation process has enabled us to reduce
the number of prisoners having to present as
homeless and securing accommodation on their
release. There have been 5 service users that
have received housing at release. Quarter 4
seen 3 further offers from the Other Category list.
Ongoing we are continuing to track cases,
ensuring tenancies are sustained and working in
partnership with Justice Throughcare Services to
support and prevent re-offending where possible. 
HTR
A4.5 Increase awareness and increase
training offered to front line
services to support people
impacted by Adverse Childhood
Experiences (ACEs) from being
homeless
Evaluate requirement to
raise awareness of
partners in relation to
ACEs. 
Service Development Sessions continue to be
delivered to Housing Officers and Housing
Support Officers across locality operational
teams to raise awareness of trauma and
providing a psychologically informed
environment. 
HTR
A4.6 Identify requirements for intensive
trauma informed and PIE
Complete scoping report Relevant Housing/Support Officers included in
ACE's and PIE training delivered on partnership HTR
134

Page 135

40 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2022/23 Lead
residential supported
accommodation to meet the needs
of extremely vulnerable groups
approach across Housing, Health and Social
Care delivered by Right There. Managers
participated in Trauma Informed Practice
awareness. This will continue to be an on-going
focus for partners.
A4.7 Promote ‘routine enquiry’ across all
health and care services, including
visiting outreach, to identify
housing provision and financial
security
Monitor and report via
Health and
Homelessness Steering
Group
Continued commitment to improving
homelessness prevention has been achieved
through the publication of the Strategic
Commissioning Plan (2022-25) will provide
opportunities to improve early intervention where
recognised triggers of homelessness are
identified. Arrangements are in place between
housing and the Health and Social Care
Partnership to progress this direction in 2023/24. 
HTR/HSCP
A4.8 Prioritise access to general medical
and universal health screening
services for homeless people,
including primary care (GP),
prescribing, dentists, etc
Monitor and report via
Health and
Homelessness Steering
Group
Progress made over last year particularly positive
partnership with community links health team.
During 2023/24 work will continue to explore
opportunities to expand and evidence prevention
activity through priority access. 
Evaluation will be undertaken with a formal report
to the IJB by end of 2023. 
HTR/HSCP
135

Page 136

41 
Priority Objective 4: Expand the scope and capacity of our Housing First approach to be the first response for households with
multiple complex needs
Actions Target/Milestone Progress in 2022/23 Lead
This will allow sufficient time to take account of
the of legislation and statutory guidance on new
prevention of homelessness duties for public. 
bodies in the forthcoming Housing Bill. 
Priority Objective 5: Enhance integration and partnership working to embed RRTP through a whole systems approach
RRTP Measures Target RRTP
Baseline
Progress
2022/23 Lead
M5.1 Number of training and employment pathways for
homeless households 
To be agreed To be agreed 4 FCR 
Priority Objective 5: Enhance integration and partnership working to embed RRTP through a whole systems approach
Actions Target/Milestone Progress in 2022/23 Lead
A5.1 Work with DWP to further develop
use of discretionary support funding
for homeless households to
undertake appropriate training to
develop skills and resilience to
improve access to employment
Agree pathways for
accessing discretionary
support with DWP
DWP continue to work with the council and a
range of third sector organisations to ensure
claimants who are homeless/at risk of
homelessness are offered relevant and timely
support.
HTR/DWP
136

Page 137

42 
Priority Objective 5: Enhance integration and partnership working to embed RRTP through a whole systems approach
Actions Target/Milestone Progress in 2022/23 Lead
A5.2 Explore options for improving digital
connectivity for all homeless
households, increasing
engagement with services, and
enabling improved tenancy
management
Explore options for
expansion of project
Utilising RRTP funding, the Bringing IT Home
project was expanded. Since 2019 108 homeless
and vulnerable households have been provided
with digital devices and unlimited internet access
for 2 years.
HTR
A5.3 Ensure effective training for staff is
in place on awareness of the third
sector support available to people
at risk of homelessness in each
locality 
Implement improvements
as required
VASLAN continue to be represented within the
RRTP partnership for raising awareness of third
sector support within South Lanarkshire.  TS
A5.4 Contribute to ongoing development
and review of homelessness
business plan to ensure sufficient
resources available to continue to
provide high quality services to
homeless households
Implemented
recommendations as
required
Progress against Homelessness Business Plan is
monitored on an ongoing basis throughout the
year, through monthly performance report and at
mid-year and year-end review.  HTR   
137

Page 138

43 
138

Page 139

Agenda Item 
Report  
Report to:  Housing and Technical Resources Committee 
Date of Meeting:  30 August 2023
Report by:  Executive Director (Housing and Technical Resources) 
Subject:  Disposal of Domestic Council Properties within
Castlebank House, Lanark 
1. Purpose of Report 
1.1. The purpose of the report is to:- 
 seek approval to declare 4 Council properties within Castlebank House,
Lanark, surplus to the operational requirements of Housing and Technical
Resources
 seek approval to dispose of 4 Council properties within Castlebank House,
Lanark on the open market, with any income allocated to the Housing
Revenue Account’s Capital Programme
 advise of proposals to formally engage with the remaining tenants and
residents to discuss the Council’s intentions in relation to Castlebank House 
2.  Recommendation(s) 
2.1.  The Committee is asked to approve the following recommendation(s):- 
(1) that the 4 existing empty Council properties within Castlebank House,
Lanark, as detailed within Appendix 1 and any subsequent properties that
become empty, be declared surplus to the operational requirements of
the Resource
(2) that the Executive Director (Housing and Technical Resources) be
authorised to progress disposal of the properties from the Housing
Revenue Account, through the Council’s existing surplus property
procedure
(3) that the Executive Director (Housing and Technical Resources), in
consultation with the Head of Administration and Legal Services, be
authorised to conclude all matters in respect of any subsequent disposal
and enter into the necessary legal agreements in terms which are in the
best interest of the Council
(4) that engagement takes place with the remaining tenants and residents to
advise of the Council’s intentions in relation to Castlebank House 
3.  Background 
3.1.  Castlebank House, Lanark is a category B listed, 3-storey former country
house. The property and associated ancillary buildings, are situated within the
grounds of Castlebank Park with access to the property through a traditional
gate house and single track, stone chipped road through the park. 
3.2. The property was constructed in circa 1760 and came into public services ownership
when purchased by the Royal Burgh of Lanark from Margrave Estates in 1952. 
15
139

Page 140

3.3. South Lanarkshire Council inherited the property in 1996 following local
government re-organisation.  The property is divided into 12 separate
dwellings ranging from 1 to 3 bedrooms in size.  Eight of the 12 properties
remain in Council ownership, with 4 purchased by private owners as part of the
statutory Right to Buy scheme which was in place until 2016.   
4. Current Position
4.1. Of the remaining 8 Council properties, 4 are currently empty.  These have not
been re-let due to significant works required to bring them up to a lettable
standard. 
4.2. A full building survey was completed on Castlebank House in 2014 and
concluded that the Council properties and wider building would require
significant investment if it were to meet the required Scottish Housing Quality
Standard (SHQS) or energy efficiency standards for social housing. 
4.3. The conclusions of this survey have been reviewed, with costs updated to
reflect inflationary pressures and revised standards.  The estimated costs
associated with bringing the Council properties and the Council’s proportion of
common parts up to the required standard amounts to over £2 million. 
4.4. This re-affirmed the initial conclusions that significant financial investment
would be required for the Council properties to meet the relevant quality and
energy efficiency standards, with substantial contributions also required from
the other property owners to upgrade common parts. 
4.5. The layout and construction type of Castlebank House offers little flexibility for
the properties to be adapted to meet the changing needs of tenants over time.
In addition, the repair costs associated with the properties are significantly
higher than those of mainstream housing stock. 
4.6. These significant costs and limitations, coupled with the complexities
associated with the listed building status and joint ownership of Castlebank
House, have led to the proposal to dispose of the 4 empty properties within the
Council’s ownership.   
4.7. It is proposed at this stage that the associated ancillary buildings are not
included in the sale of the properties and for the time being will remain in the
Council’s ownership. 
5. Tenant and Resident Engagement 
5.1. Over the course of several years, engagement has taken place with tenants
and residents of Castlebank House regarding the ongoing management and
maintenance of the main building and associated ancillary buildings. 
5.2. Following Committee approval of the disposal of the 4 empty properties, it is
proposed the Council will engage with tenants and residents to highlight the
Council’s intention to dispose of the remaining properties.  This process will
include full consideration of individual tenants’ current housing needs and
preferences and how these can be best met, supported by the Council. 
5.3. It should be noted that discussions with individual tenants will seek to reassure
them of their right to remain in their current home and that any option to move
to alternative Council housing would only be progressed with their expressed
consent.  
140

Page 141

6. Next Steps 
6.1. Following approval from Housing and Technical Resources Committee,
officers will communicate the Councils’ intentions to the remaining tenants and
residents. 
6.2. Officers will be instructed to declare the 4 empty Council properties within
Castlebank House surplus to requirements and market these for sale on the
open market. 
6.3. Officers will also commence formal engagement with tenants in relation to the
options for the remaining Council properties. 
6.4. Consideration will be given to future use of the associated ancillary buildings
with any formal proposals submitted to the relevant Committee for approval.   
6.5. Local elected members will be kept updated on progress in relation to the
disposal of the Council properties within Castlebank House. 
7.  Financial Implications 
7.1.  Disposal of the property could generate a receipt which will contribute to the
Housing Revenue Account’s Capital Programme.  The 4 Council properties are
currently valued between £250,000 and £350,000.  However, this may not be
achieved given the current lending market and the significant works required to
upgrade the individual properties and the common parts by any prospective
buyers.    
7.2.  Disposal of these properties will reduce the Housing Revenue Account’s liability in
terms of management and maintenance, which as noted in section 4.3 is substantial.
Should the 4 properties remain in ownership of the Council, these will have a
negative impact on the Housing Revenue Account, with expenditure required
exceeding income generated from rent. 
7.3. The proposed sale of the properties will have no impact to the general services fund
and the Council will continue to own and maintain the ancillary buildings and wider
Castlebank Park area.   
8. Employee Implications
8.1. There are no employee implications associated with this report. 
9.  Climate Change, Sustainability and Environmental Implications 
9.1.  There are no climate change, sustainability or environmental implications associated
with this report.   
10. Other Implications 
10.1.  The Council’s Legal Services has confirmed that there are no provisions in the
Council’s title deed to the property which would prevent the Council disposing
of the 4 properties in Castlebank House.  There is no reference in the title to
the building being purchased under any statutory power or for a specific
purpose and does not contain any conditions which would prevent a sale by
the Council or which would restrict the Council’s use of the building. 
10.2. Should the proposed disposal of the 4 Council properties be progressed, the
reduction in stock in the Clydesdale area will be offset through the Council’s
141

Page 142

affordable housing supply programme, with new Council properties built or
existing properties acquired. 
10.3. Should the proposed disposal of the 4 Council properties not be progressed,
the Council’s inability to achieve the SHQS and relevant national energy
efficiency standards for social housing for the properties will negatively impact
the Council’s performance on the relevant indicators within the Scottish
Housing Charter.  
11.  Equality Impact Assessment and Consultation Arrangements 
11.1.  This report does not introduce a new policy, function or strategy or recommend
a change to existing policy, function or strategy and therefore no impact
assessment is required. 
11.2.  Consultation in terms of the information contained in this report will take place
directly with residents impacted by the proposed disposal, as detailed in
section 5.   
Stephen Gibson
Executive Director (Housing and Technical Resources) 
9 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
 Focused on people and their needs 
 Working with and respecting others 
Previous References 
 None 
List of Background papers 
 None 
Contact for further information 
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services 
Email: joanne.forbes@southlanarkshire.gov.uk
Sharon Egan, Head of Housing Services
Email: sharon.egan@southlanarkshire.gov.uk  
142

Page 143

Appendix 1 
Location of Castlebank House, Lanark 
143

Page 144

144

Page 145

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Housing and Technical Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community Facility Review – Ward 7, East Kilbride
Central South 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 advise Committee of matters considered in the Asset Review Pilot exercise,
reviewing the community accessed assets within Ward 7; and
 advise Committee of the proposed action plan for the properties within East
Kilbride Central South 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the process for reviewing the community accessed facilities within Ward
7, be noted
(2) that the Ward 7 action plan is approved and incorporated into the overall
action programme for East Kilbride locality 
(3) that the Head of Property Services be authorised to investigate the options for
developing a “campus” around Murray Owen Centre that includes the pitches,
Murray Owen Bowling Pavilion and Murray Owen Football Pavilion; and 
(4) that the Head of Property Services be authorised to take forward proposals in
respect of the alternative options for:- 
 Westwood Community Hall
 Red Deer Centre and associated Bowling Club
 Dunedin Pavilion and pitches 
3. Background
3.1. Through its approach to asset management planning and prioritised investment
strategy, the Council regularly reviews its property requirements with a view to
improving the condition, suitability and effectiveness of its portfolio, identifying
opportunities to improve service delivery and create a sustainable portfolio. 
3.2. The Scottish Government has set out emission reduction targets in legislation with
the intention for Scotland to become Net Zero by 2045, with responsibility upon
public sector organisations to decarbonise their properties by 2038.  The costs
associated with complying with this target are significant, estimated at over £250
million for the Council’s schools alone.  Therefore, it is imperative before embarking
on the development of investment proposals and seeking funding, that the Council is
confident of the service need for all its properties. 
16
145

Page 146

3.3. Set against this background and in light of the increasing budget pressures within
the Council and consequently South Lanarkshire Leisure and Culture (SLLC) , the
existing asset portfolio is unsustainable and it is essential to identify opportunities to
reduce operating costs and avoid future financial liabilities.  In terms of service
continuity, it is better to do this in a planned way rather than await events which
require property closure at short notice.  A review of property assets in conjunction
with local members is now underway and this report is the result of the pilot exercise
which has informed this wider review process. 
3.4. The options for each of the properties within Ward 7 have been reviewed by
Community and Enterprise Resources, SLLC and Property Services with input from
Social Work and Education Resources where appropriate. 
3.5. Consideration has been given to the following factors:- 
 the area profile and the locality that each property serves
 accessibility and local transport
 service demand and whether the property serves a local geography or
particular type of activity, for example, sport
 potential changes in demand, for example, community growth areas and
proposed developments in the locality 
 level of current community engagement at the property
 property investment 
 operating costs 
3.6.  The next stage has been to discuss the information collated on the assets with
elected members for the Ward through 3 meetings.  Those meetings worked
towards developing the action plan and identifying assets either as:- 
 Core Estate – preference to continue to maintain the property, with repairs and
maintenance being programmed through the repair budgets and prioritised
investment fund
 Opportunities – potential reuse or redevelopment leading to:- 
 better use of remaining assets
 potential for revenue savings and avoidance of unnecessary capital
expenditure
 carbon reduction
 releasing assets for other operational uses or site redevelopment
 releasing assets for sale or lease through the Property Bulletin process
 Community Asset Transfer opportunities 
3.7. This report outlines the outcomes of those detailed discussions and highlights the
proposed actions. 
4. Assessment of Assets
4.1. Core Estate
4.1.1. Schools 
The Council’s modern school estate is core to the locality and there are 7 schools in
Ward 7.  Three schools are not currently available to the community letting
programme as they are within 1 mile of a high school. 
146

Page 147

Opportunities remain for the community use of:- 
 Heather Knowe Primary School
 Murray Primary School
 St Louise’s Primary School 
The opportunities at Duncanrig Secondary School are under review following the
recent announcement of SLLC withdrawal from service provision at this facility. 
4.1.2. Murray Owen Centre/East Kilbride Lifestyles 
This is a modern facility in good condition which operates as a social work day care
facility during the day and a lifestyles facility in the evening and at weekends.  The
facility is operationally considered a core property within the Ward and has capacity
for additional community letting through discussion with Social Work Resources and
SLLC.  This property should be a priority for planned maintenance and investment. 
The facility is adjacent to playing fields, a football pavilion and bowling greens with a
bowling pavilion and there is potential to create a “campus” with these adjoining
facilities which are well used. 
4.2. Opportunities
4.2.1. Westwood Hall
This hall is in basic condition and would require significant capital investment within
the next 5 years to simply to sustain the existing service.  The level of use is low and
income does not even cover the utility costs.  There is scope to transfer the existing
activities to alternative facilities in the Ward.   
Opportunities include:- 
 sale or lease of the property on the open market
 sale or lease to an adjoining owner; and
 Community Asset Transfer – although no known interests at present 
4.2.2. Red Deer Centre and Red Deer Bowling Club
Red Deer Centre, formerly a day centre, remains the responsibility of Social Work
Resources.  Part of the building is leased to Red Deer Bowling Club and there are a
number of legacy community lets that are currently free of charge which are
anomalous to other community assets.  Of the 23 groups that used the facility pre
Covid, only 9 continue and there is scope to transfer these remaining activities to
alternative facilities in the Ward, albeit that charges would apply at the new locations
to apply consistency with the treatment of other community groups. 
This facility is in extremely poor condition with running costs of approximately
£220,000 per annum and investment of around £1.15 million forecast to be required
over the next 5 years, simply to bring the property into a state of good repair.  In
order to meet modern standards of accommodation, investment in order of £3.8
million would be required.  There are no budgets available for this scale of
investment. 
Community Asset Transfer is unlikely to be a viable option given the level of funding
required for the refurbishment of the facility, however, there are options in terms of
retaining the bowling greens that could be explored with the club and external
funders or for the club to merge with other nearby clubs. 
147

Page 148

The location is suitable for residential or commercial redevelopment and initial
investigations show that the site would be suitable for social housing. 
Opportunities include:- 
 redevelopment by the Council for Social Housing
 combination with the adjoining social housing site owned by East Kilbride
Housing Association
 disposal 
4.2.3. Dunedin Pavilion
The pavilion serves the adjoining grass and blaze pitches, is in basic condition and
there are currently no lets for the facility. 
There is interest in Community Asset Transfer for existing use, however, in terms of
redevelopment, the site would have challenges in terms of planning policy and
Sports Scotland could seek to have the pitches reprovisioned elsewhere if
development or disposal was proposed. 
The opportunities include:- 
 Community Asset Transfer – live interest from local sports club 
5. Next Steps
5.1. It is recognised that the core community facilities in the area are the schools and the
Murray Owen/East Kilbride Lifestyles.  There is potential to create a “campus”
around the lifestyles based on the property, the pitches, bowling club and pavilion.
Some alterations may be required to Murray Owen Centre to support increased
community use and the potential investment need will be identified and considered
as part of the Transition Fund. 
5.2. It is recommended that:- 
 discussions commence with the users of Westwood Hall and Red Deer Centre
to identify alternative locations for their activities
 the opportunity to redevelop the site of the Red Deer Centre for Social Housing
is progressed
 the opportunity to dispose of Westwood Hall is progressed; and
 discussions continue with the local community regarding the Community Asset
Transfer of Dunedin Pavilion 
6. Employee Implications
6.1. The review of services may result in the requirement for adjustments to staffing
arrangements and these will be considered as part of any future detailed property
project.  This will include discussions with SLLC and Unions.  There are not,
however, considered to be any significant issues within Ward 7. 
7. Financial Implications
7.1. Financial implications will be identified through the development of any individual
projects and will include any possible adjustment to repairs and maintenance
budgets, potential capital projects, any potential capital receipts and/or revenue
savings along with community benefits. 
148

Page 149

8. Climate Change, Sustainability and Environmental Implications
8.1. This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
9. Other Implications
9.1. There are potentially implications for service users arising from decisions to close or
asset transfer properties and in the case of each property recommended for more
detailed review, the opportunities for relocating or re-provisioning the service will
take these implications into account. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.  Services may, however, be required to undertake equality
impact assessments when considering service reviews and/or the specific
circumstances of a property. 
10.2. The contents of this report have been the subject of consultation with Community
and Enterprise Resources, SLLC and Property Services with input from Social Work
and Education Resources where appropriate. 
10.3. The contents of this report have been the subject of consultation with the elected
members for Ward 7. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
26 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes
Head of Property Services
01698 455621
Joanne.forbes@southlanarkshire.gov.uk
149

Page 150

150

Page 151

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject:   2 & 2A Langlands Avenue, Kelvin South Industrial
Estate, East Kilbride – Lease to Ellsworth Adhesives
Limited 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the request for a lease of 2 & 2A Langlands Avenue, Kelvin
South Industrial Estate, East Kilbride to Ellsworth Adhesives Limited and seek
approval to the principal terms and conditions as set out in section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the subjects at 2 & 2A Langlands Avenue, Kelvin South Industrial Estate,
East Kilbride be leased to Ellsworth Adhesives Limited subject to the terms and
conditions outlined in section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal
agreements on terms which are in the best interests of the Council 
[1recs]
3. Background
3.1. Ellsworth Adhesives Limited has occupied 2 Langlands Avenue since 1 June 2006
under the terms of a 5-year lease.  In October 2007, the company extended its
operation into the adjoining unit at 2A Langlands Avenue and the 5-year lease was
varied to formalise this change. 
3.2. The lease has been automatically renewing every year since June 2011 on the same
terms and conditions at a rental of £85,000 per annum. 
3.3. This unit is typical of the units within the estate which suffer from defective floor slabs
resulting in severe moisture problems affecting floor finishes and creating high
humidity levels.  This issue limits the use to which the units can be utilised, reducing
both the marketability and the rentals for the units in the estate.   
3.4. Occupational and rental levels within the estate have until now, remained fairly static,
however as a result of increasing demand for industrial space rental levels are rising.
As a result, negotiations were entered into with the tenant for new lease terms. 
4. Property
4.1. The premises were constructed in 1994 within an estate of 27 units of steel portal
frame construction with cavity brickwork and composite metal cladding to roofs. 
17
151

Page 152

The unit is fully serviced including direct fired gas heating, WCs, 3 phase electricity,
together with pedestrian and vehicular access doors.  Ample car parking and
servicing is provided close by. 
4.2. The premises extend to a gross internal area of 2,592 sqm or thereby.  This is the
largest industrial unit in the Council’s industrial portfolio. 
4.3.  Other than the known issue with the floor slabs, the property is in good condition for
its age. 
5. Proposal
5.1. It is proposed to lease the subjects at 2 & 2A Langlands Avenue, Kelvin South
Industrial Estate, East Kilbride to Ellsworth Adhesives Limited on the following
principal terms and conditions:- 
1. the lease will be to Ellsworth Adhesives Limited
2. the lease will be for a period of 5 years
3. the date of entry to be agreed
4. the rental will be £101,000 per annum
5. a 3-month rent-free period will be granted
6. the lease to be fully repairing and insuring basis
7. the Council will insure the property and recover the costs from the tenant
8. the property will be used for supply and distribution of adhesives
9. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
10. assignation of lease will be permitted with landlord’s prior written consent
11. sub-letting of the premises will not be permitted
12. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in increased rental income for the Council. 
7.2 To date the tenant has undertaken all lease obligations in a proper and timely
manner and it is anticipated that this will continue.  The risk to the Council of
increasing the rental is minimal.   
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. By granting a 5-year lease, the Council will secure a rental income of circa £480k
over the next 5 years and alleviate itself of any potential empty property costs. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
152

Page 153

Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Thriving business, fair jobs and vibrant town centres. 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk
153

Page 154

154

Page 155

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Floor 14, Council Offices, Almada Street, Hamilton –
Extension of Lease to SEEMiS Group LLP 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for an extension of the lease of floor 14,
Council Offices, Almada Street, Hamilton to SEEMiS Group LLP and seek
approval to the principal terms and conditions as set out in section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the lease of floor 14, Council Offices, Almada Street, Hamilton to SEEMiS 
Group LLP be extended subject to the terms set out in section 5 of the report;
and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the Minute of Variation and enter into the necessary
legal agreements on terms which are in the best interests of the Council 
[1recs]
3. Background
3.1. SEEMiS Group LLP was originally formed by 12 Councils and delivers management
information systems to schools and education authorities throughout Scotland. 
3.2. SEEMiS has occupied floor 14 of the Council Offices at Almada Street, Hamilton
since 1 September 2013 under the terms of a 10-year lease. 
3.3. The current rent of £109,727 per annum was last reviewed in September 2018.  This
is a composite charge which includes all costs related to the tenant’s occupation of
floor 14 including non-domestic rates, utility costs, heating, service charges, cleaning
and building insurance. 
3.4. SEEMiS has requested terms for a 5-year extension of its lease.  As the operational
costs of the building have increased, it is proposed that the composite rent be
increased from £109,727 per annum to £121,000 per annum.  The remaining agreed
terms are detailed in section 5. 
4. Property
4.1. The floor 14 of the Council Offices at Almada Street extends to 562 sqm. 
5. Proposal
5.1. It is proposed the existing lease of floor 14, Council Offices, Almada Street, Hamilton
to SEEMiS Group LLP be varied on the following principal terms and conditions:-
18
155

Page 156

1. the lease is to SEEMiS Group LLP
2. the lease will be extended for a period of 5 years
3. the effective date will be 1 September 2023
4. the composite rent charge for year 1 year shall remain at £109,727 per annum
5. the composite rent charge for years 2-5 will be £121,000 per annum
6. all other lease terms will remain as existing
7. each party to be responsible for their own legal costs, however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease extension will result in increased rental income for the Council. 
7.2. To date the tenant has undertaken all lease obligations in a proper and timely
manner and it is anticipated that this will continue.  The risk to the Council of
increasing the rental is minimal.   
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. By granting a 5-year lease extension, the Council will secure a rental income of circa
£594k over the next 5 years and maximise the use of a key corporate office. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent 
Previous References
♦ None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk
156

Page 157

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 30 August 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Stewartfield Community Centre, East Kilbride – Asset
Transfer to Badminton Academy Social Enterprise 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for asset transfer, by lease, of Stewartfield
Community Centre, East Kilbride to Badminton Academy Social Enterprise
(BASE) and request approval to the principal terms and conditions of asset
transfer as set out in section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Stewartfield Community Centre, East Kilbride be leased to Badminton
Academy Social Enterprise (BASE), subject to the terms and conditions
outlined in section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal
agreements on terms which are in the best interests of the Council 
3. Background
3.1. The Council owns Stewartfield Community Centre, East Kilbride, adjacent to
Morrisons supermarket.  The property is leased to South Lanarkshire Leisure and
Culture (SLLC) and consists of a main sports hall and smaller community hall. 
3.2.  BASE is a Community Interest Company Limited by Shares that has been in
existence since February 2021.  BASE is a not for profit social enterprise with the
purpose of bringing people and communities together through a shared interest in
badminton. 
3.3. BASE submitted a request for Community Asset Transfer of the sports centre, by
lease, the validation date for which was 26 February 2023. 
3.4. In addition to placing the application and supporting documentation on the Council’s
Planning Portal, notices were placed on the property advising that the Council was
considering an asset transfer.  The closing date for responses was 17 May 2023 at
which time 212 representations were received, 28 in favour of the project and 184
against.  Many of the objections were against the principle of asset transfer and lack
of certainty for existing users.  Others were based upon the assumption that the
Council/SLLC would retain the costs of operating and maintaining the building. 
19
157

Page 158

Particular concerns were raised in respect of the impact on trampolining and the
Additional Support Needs (ASN) groups currently using the facility. 
3.5. The request was placed before the Community Asset Transfer Assessment Panel on
30 June 2023 when the following matters were taken into consideration. 
3.6. Property
3.6.1. The property, built in 1994, is situated within a small retail park next to Morrisons
supermarket and is in good condition.  It consists of a large sports hall and a smaller
hall/community space with car parking shared with the other retail park occupiers. 
3.6.2. The facility particularly appeals to trampoline and badminton users as the large hall
has a high roof.  The only other facility in the area with a similar roof height is the
John Wright Sports Centre. 
3.6.3. This is an operational facility leased to SLLC and was identified as potentially “at
risk” in the South Lanarkshire Leisure and Culture Review of 2021.  Whilst not one of
the properties handed back to the Council in April 2023, it remains vulnerable to
closure.  SLLC has confirmed that the property operates at a loss in excess of
£140,000 per annum. 
3.6.4. User levels have almost halved from pre-Covid levels. 
3.6.5. The existing lease with SLLC will require to be terminated should the asset transfer
proceed. 
3.6.6. The Planning Service has indicated that planning consent will not be required as
there is no change of use. 
3.6.7. The in-house valuer has placed a rental value of £20,000 per annum on the property,
however, this is based upon the assumption that there is a market for alternative
community and commercial uses.  It is likely, if the property was not operationally
required, it would remain vacant for some considerable time before attaining this
level of rent. 
3.7. Organisation
3.7.1. The organisation was established as a Community Interest Company Limited by
Shares, Scottish Charity No. SC689388 in February 2021.   
3.7.2. Legal Services has confirmed the constitution is appropriate for Community Asset
Transfer by lease and the company has not been established for private gain, any
surplus or assets have to be used for the benefit of the badminton community. 
3.7.3. BASE is a social enterprise with the clear purpose of bringing people and
communities together through a shared interest in badminton.  The objects of the
Company are to carry on activities which benefit the community and in particular,
(without limitation), to promote the training and playing of badminton throughout
Scotland. 
3.7.4. The organisation has 4 Board members and works with a coaching community of 10
individuals and a small number of volunteers.  Two of the Board members have
business experience and 2 are actively involved in the sport. 
158

Page 159

3.8. Project
3.8.1. The proposal is to transfer the community centre via a 5-year lease at nominal rent.
No major investment works are proposed or required at present. 
3.8.2. The project is to create a badminton academy and a base for badminton within
Lanarkshire and beyond.  The main sports hall will become exclusively for badminton
with the smaller hall continuing to be available for a wider range of uses and
community activity. 
3.8.3. BASE has undertaken a financial feasibility study and used the worst case to best
case scenarios to demonstrate their understanding of the costs and risks involved.
The proposal is based upon having 1 full time employee; a cleaner/caretaker.  The
facility would be managed by 1 of the Board members and the pool of 10 coaches. 
3.8.4. The study shows that the facility will run at a significant loss in year 1 and BASE
intends to raise funds to support the expenditure through a Board loan. 
4. Assessment
4.1. BASE has an experienced Board and a close relationship with the sport’s governing
body, Badminton Scotland.  However, it is not a registered charity and the structure,
aims and management can be changed by its Board.  Therefore, it is proposed that
the lease include a restriction on assignation, subletting or other sharing of
occupation, requiring BASE to obtain the Council’s approval to any proposed change
in constitution or Board control. 
4.2. There are no significant capital works required to the property, therefore, no grant
funding applications are being made at the present time. 
4.3. There are risks in terms of the viability of the project, particularly in the first year and
although specific funding sources have not been referenced within the application,
BASE has advised that the initial revenue costs will be covered by a loan. 
4.4. The community benefits derived from the proposal relate to health and wellbeing,
education and development of sport.  The Assessment Panel is of the view that the
benefits to the badminton community are, in part, offset by the loss of access to the
classes currently delivered by SLLC at this location.  Therefore, it has been agreed
with BASE that, should the lease be approved, SLLC will retain the right to access
the small hall for 9 hours each week to deliver classes. 
4.5. Within its asset transfer request, BASE requested transfer by lease at a nominal
rental of £1 per annum.  The Community Asset Transfer Working Group assessed
the potential community benefits and recommended that a discount of 90% be
applied.  This equates to £2,000 per annum. 
4.6. On balance, given the significant deficit to SLLC associated with operating the
facility, that SLLC classes will be able to continue, that the majority of other existing
users can be accommodated at other facilities and that this proposal will establish a
regional sports academy offering opportunity to aspiring athletes as well as those
playing the sport recreationally, it is recommended that the 5 year lease be granted. 
5. Proposal
5.1. It is proposed to grant a lease of Stewartfield Community Centre, East Kilbride to
BASE on the following principal terms and conditions:- 
159

Page 160

1. The lease will be for 5 years
2. The rental is £2,000 per annum 
3. The use will be for a sports facility and community centre
4. The tenants would be responsible for all repairs and maintenance 
5. The tenants would be responsible for all necessary insurances required in
connection with their occupation and use of the site including public liability
insurance.  The Council will continue to insure the building and recharge the
insurance premium
6. Date of Entry to be agreed
7. Assignation, subletting or sharing of occupation, will require Landlord’s consent,
such consent being at the Landlord’s sole discretion
8. Any change in constitution, organisational structure or board control will be
regarded as an assignation
9. Each party to bear their own Legal Fees 
5.2. The offer of lease will be conditional upon:- 
 An agreement being entered into with SLLC enabling their continued use of the
small hall, for a maximum of 9 hours a week, to allow of continued provision of
local services.  This access to the facility will be at no charge to SLLC. 
6. Employee Implications
6.1. There are 4 employees currently based at this facility 1 full time duty officer, 1 full
time and 2 part-time recreation assistants.  TUPE implications have not been
investigated in detail.  SLLC has indicated that regardless of TUPE, it should be able
to redeploy the staff to other facilities in the area over time. 
7. Financial Implications
7.1. The proposed asset transfer removes SLLC operating loss of in excess of £140,000
per annum whilst allowing the existing classes to still be delivered. 
7.2. The full saving to SLLC would not be immediately delivered as it would be
dependent upon the successful transfer of staff to other establishments as vacancies
arose. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until
26 August 2023 to provide a notice of its decision whether to agree to or refuse the
asset transfer request.  BASE had agreed to a short extension to match in with the
Committee timetable. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale or the asset transfer request be refused. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the SLLC, Community and Enterprise Resources,
Planning, Legal and Finance Services as well as having been published for public
consultation. 
160

Page 161

10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
30 July 2023 
Link(s) to Council Values/Priorities/Objectives
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 Asset Transfer Application Ref CAT/23/0005 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk
161

Page 162

162