Democracy Spraffa

Agenda Document Pack - Housing and Technical Resources Committee - 31/05/2023

South Lanarkshire Council · 31 May 2023
Back to Housing and Technical Resources Committee — 31 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 23 May 2023 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 31 May 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Davie McLachlan (Chair), Martin Lennon (Depute Chair), Joe Fagan (ex officio), John
Bradley, Walter Brogan, Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry
Convery, Margaret Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Allan Falconer,
Grant Ferguson, Alistair Fulton, Ross Gowland, Geri Gray, Ross Lambie, Richard Lockhart,
Julia Marrs, Ian McAllan, Kenny McCreary, Norman Rae, David Shearer, Margaret B
Walker 
Substitutes
Robert Brown, Poppy Corbett, Gladys Ferguson-Miller, Martin Hose, Cal Johnston-
Dempsey, Gavin Keatt, Susan Kerr, Eileen Logan, Monique McAdams, Richard Nelson,
Helen Toner, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources
Committee held on 15 March 2023 submitted for approval as a correct record.
(Copy attached) 
5 - 12 
Monitoring Item(s) 
3 Housing and Technical Resources - Workforce Monitoring - January to
March 2023
Joint report dated 14 April 2023 by the Executive Director (Finance
and Corporate Resources) and Executive Director (Housing and
Technical Resources). (Copy attached) 
13 - 18 
Item(s) for Decision 
4 Housing and Technical Resource Plan 2023/2024
Report dated 10 May 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
19 - 44 
5 Pavilion at Alexander Hamilton Memorial Park, Stonehouse – Asset
Transfer to Friends of Stonehouse Park
Report dated 24 April 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
45 - 50 
6 The Fountain 9-11 Abbeygreen, Lesmahagow – Lease to Lesmahagow
Development Trust
Report dated 26 April 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
51 - 56 
Item(s) for Noting 
7 Annual Update on the Property Asset Management Plan 2021 to 2025
Report dated 11 May 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
57 - 78 
8 Revision of Costs Associated with the Acquisition of Houses at
Brackenhill Farm, Hamilton
Report dated 21 April 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
79 - 82 
9 Delegated Authority Report – Update
Report dated 6 April 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
83 - 86 
10  Notification of Contracts Awarded - 28 October 2022 to 31 March 2023
Report dated 11 April 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
87 - 92 
2

Page 3

Urgent Business 
11  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 15 March 2023 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor
Gerry Convery, Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Allan Falconer, Councillor Grant Ferguson, Councillor Alistair
Fulton, Councillor Ross Gowland, Councillor Geri Gray, Councillor Ross Lambie, Councillor Martin
Lennon (Depute), Councillor Richard Lockhart, Councillor Julia Marrs, Councillor Ian McAllan,
Councillor Kenny McCreary, Councillor Norman Rae, Councillor Ali Salamati (substitute for
Councillor John Bradley), Councillor David Shearer, Councillor Margaret B Walker 
Councillors' Apologies:
Councillor John Bradley, Councillor Janine Calikes, Councillor Joe Fagan (ex officio) 
Attending:
Finance and Corporate Resources
G Booth, Finance Adviser; H Calley, Administration Officer; J Davitt, Public Relations Officer; H
Goodwin, Finance Manager (Resources); E McPake, HR Business Manager; L O’Hagan, Finance
Manager (Strategy); M M Wilson, Legal Services Manager; L Wyllie, Administration Assistant
Housing and Technical Resources
S Gibson, Executive Director; A Finnan, Head of Housing Services; J Forbes, Head of Property
Services; C Mitchell, Strategy and Support Manager 
1 Declaration of Interests 
The following interest was declared:- 
Councillor(s) Item(s) Nature of Interest(s)
Cowan Acquisition of Property in Netherburn Involved in sale of property 
2 Minutes of Previous Meeting
The minutes of the meeting of the Housing and Technical Resources Committee held on 14
December 2022 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Minutes of Special Meeting 
The minutes of the special meeting of the Housing and Technical Resources Committee held on
23 January 2023 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
2
5

Page 6

4 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources (excl
Housing Revenue Account (HRA))
A joint report dated 15 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April 2022 to 27 January
2023 for Housing and Technical Resources (excl HRA). 
Following the probable outturn exercise, the forecast to 31 March 2023 was an overspend of
£0.342 million.  This overspend was mainly due to overspends in the Estates and Homelessness
services and was offset by underspends in Supporting People and other Housing budgets. 
As at 27 January 2023, there was an overspend of £0.245 million against the phased budget. 
Virements were proposed to realign budgets, as detailed in appendices B and C to the report. 
The Committee decided: 
(1) that the overspend position of £0.245 million, as at 27 January 2023, on Housing and
Technical Resources’ (excl HRA) Revenue Budget and the forecast to 31 March 2023 of
an overspend of £0.342 million, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of the Executive Committee of 1 March 2023 (Paragraph 3)] 
5 Revenue Budget Monitoring 2022/2023 - Housing and Technical Resources
- Housing Revenue Account (HRA)
A joint report dated 15 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of the actual
expenditure measured against the revenue budget for the period 1 April 2022 to 27 January
2023 for Housing and Technical Resources (HRA). 
As at 27 January 2023, there was a breakeven position against the phased budget and,
following the Council’s formal Probable Outturn exercise, the forecast to 31 March 2023 was
also a breakeven position. 
Virements were proposed, as detailed in Appendix A to the report. 
The Committee decided: 
(1) that the breakeven position on Housing and Technical Resources’ (HRA) revenue budget,
as detailed in Appendix A of the report, and the forecast to 31 March 2023 of a breakeven
position be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of the Executive Committee of 1 March 2023 (Paragraph 3)]
6

Page 7

6 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources (excl
Housing Revenue Account (HRA))
A joint report dated 22 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of progress on the
capital programme for Housing and Technical Resources (excl HRA) for the period 1 April 2022
to 27 January 2023. 
At its meeting on 14 December 2022, this Committee noted that the budget for Housing and
Technical Resources for the financial year 2022/2023 totalled £8.486 million.  At its meeting on
1 February 2023, the Executive Committee agreed changes to the Housing and Technical
Resources’ Capital Programme totalling a net decrease of £0.050 million, as detailed in
Appendix A of the report.  The revised Housing and Technical Resources’ programme for
2022/2023 totalled £8.436 million. 
Work had been ongoing to monitor the predicted spend position for this financial year and
current estimates from Housing and Technical Resources suggested an outturn of £5.1 million. 
This represented an underspend of £3.336 million and was mainly due to timing of spend on a
number of multi-year projects, which resulted in budget required in 2023/2024 rather than
2022/2023.   
Anticipated spend to date was £1.709 million and spend to 27 January 2023 amounted to
£1.691 million, an underspend of £0.018 million.  This mainly reflected the timing of spend on
the multi-year and multi-project Principal Offices Programme. 
The Committee decided: 
(1) that the Housing and Technical Resources’ (excl HRA) capital programme of £8.436
million and expenditure to date of £1.691 million be noted; and 
(2) that the projected outturn of £5.1 million be noted. 
[Reference: Minutes of 14 December 2022 (Paragraph 5) and Minutes of the Executive
Committee of 1 February 2023 (Paragraph 4)] 
7 Capital Budget Monitoring 2022/2023 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 15 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted advising of progress on the
capital programme for Housing and Technical Resources (HRA) for the period 1 April 2022 to 27
January 2023. 
The revised Housing Capital Programme for 2022/2023 totalled £66.361 million and was
detailed, along with the funding sources, in Appendix A to the report.  Actual expenditure to 27
January 2023 was £43.015 million. 
It was estimated that there would be an underspend of £4.1 million within the Housing Capital
Programme at the end of the financial year.  It was noted that this was mainly due to Property
Services’ operatives being diverted from capital works to respond to the impact of the severe
weather in December 2022. 
Work would continue to monitor achievable spend and funding for projects that remained
unspent at the end of the financial year would be carried forward into 2023/2024 to allow
projects to be completed. 
7

Page 8

The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £66.361 million and expenditure of
£43.015 million be noted. 
[Reference: Minutes of 14 December 2022 (Paragraph 6) 
8 Housing and Technical Resources – Workforce Monitoring – October to December
2022
A joint report dated 2 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted on the following employee
information for Housing and Technical Resources for October to December 2022:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 10 December 2022 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 14 December 2022 (Paragraph 7)] 
9 Housing Allocation Policy – Local Letting Plans 2023/2024
A report dated 23 February 2023 by the Executive Director (Housing and Technical Resources)
was submitted advising on progress against the 2022/2023 letting targets and requesting
approval for:- 
 the 2023/2024 letting targets
 the 2023/2024 Local Letting Initiatives (LLIs) 
Local Letting Plans (LLPs) were a key feature of the Housing Allocation Policy and continued to
ensure that a strategic and flexible approach was taken in the allocation of Council housing. 
Annually, LLPs were prepared for each housing management area and provided an overview of
local supply and demand setting out:- 
 annual letting targets for each of the 4 housing lists (in relation to mainstream and
sheltered properties)
 details of LLIs in operation within a local area 
LLPs and associated targets were subject to this Committee’s approval and this was the third
annual report since the revised Housing Allocation Policy had been introduced.   
Details of the projected outcomes in relation to the letting targets set for both mainstream and
sheltered properties in 2022/2023 were set out in appendices 1 and 2 of the report and factors,
which had been taken into account when setting the mainstream letting targets, were
summarised in the report.
8

Page 9

The Housing Allocation Policy allowed for the establishment of LLIs in areas where there were
particular needs, issues or circumstances which required to be addressed.  It was proposed that
the 5 LLIs set out in Appendix 3 of the report be retained during 2023/2024.  It was also
proposed that a new LLI be introduced in the Whitlawburn area of Cambuslang to promote
sustainability and cohesion. 
The South Lanarkshire-wide letting initiative had been introduced in 2013 to mitigate the impact
of the under-occupancy provisions of the Welfare Reform Act 2012.  An evaluation of the
initiative confirmed that its impact had been very limited, with only 4 tenants rehoused since
2018/2019 and none during the last year.  This could be attributed to the availability of the
Discretionary Housing Payment which mitigated the impact of the under-occupancy provisions of
the Act that enabled tenants to continue living in their own home without additional liability.  In
addition, there were now very few applicants on the housing register who met the criteria for
priority to be awarded under the initiative.  Consequently, it was proposed that the initiative be
discontinued from 3 April 2023.  It was recognised, however, that there were benefits to
providing means for supporting and facilitating tenants living in larger homes to move to smaller
properties and those were detailed in the report. 
Within the current Housing Allocation Policy, under-occupancy was a recognised housing need
category and points were awarded to tenants living in properties which were larger than the
household required.  It was proposed that, during 2023/2024, a proactive approach be taken to
support tenants under-occupying larger sized Council properties to downsize to a smaller
property, where they wished to do so.  A review of tenants in that situation would be progressed
and a housing options based discussion would take place to identify tenants’ needs and, where
appropriate, ensure they were placed on the housing register and that preferences were
reasonable. 
The 2023/2024 LLPs would be published on the Council’s website. 
The Head of Housing Services responded to members’ questions on various aspects of the
report. 
The Committee decided: 
(1) that progress against the 2022/2023 letting targets be noted; 
(2) that the 2023/2024 mainstream housing letting targets, attached as Appendix 1 to the
report, be approved; 
(3) that the 2023/2024 sheltered housing letting targets, attached as Appendix 2 to the report,
be approved; and 
(4) that the Local Letting Initiatives, attached as Appendix 3 to the report, be approved. 
[Reference:  Minutes of 8 December 2021 (Paragraph 8)] 
10 Housing and Technical Resource Plan - Quarter 2 Progress Report 2022/2023
A report dated 10 February 2023 by the Executive Director (Housing and Technical Resources)
was submitted on the Housing and Technical Resource Plan Quarter 2 Progress Report
2022/2023, for the period 1 April to 14 October 2022. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG), which indicated that an action had been completed.
9

Page 10

Details were provided on:- 
 the outcomes established to support the delivery of the Connect Plan priorities in
2022/2023, as detailed in Appendix 1 to the report
 progress against all Resource Plan measures contained in the Quarter 2 Progress Report
2022/2023, as detailed in Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in paragraph 5.3 of the
report
 areas for improvement and associated management actions, as detailed in paragraph 5.4
of the report 
The Strategy and Support Manager responded to a member’s question on the report. 
The Committee decided: 
(1) that the Housing and Technical Resource Plan Quarter 2 Progress Report 2022/2023, as
summarised in paragraph 5.2 and attached as Appendix 2 of the report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in paragraph 5.3 of
the report, be noted; and 
(3) that the areas for improvement and associated management actions, as detailed in
paragraph 5.4 of the report, be noted. 
[Reference:  Minutes of 5 October 2022 (Paragraph 8) and Minutes of the Executive Committee
of 30 November 2022 (Paragraph 6)] 
11 Revision of Costs Associated with the Acquisition of Houses at Former Phillips
Factory Site, Wellhall Road, Hamilton - Section 75
A report dated 13 February 2023 by the Executive Director (Housing and Technical Resources)
was submitted advising on the action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Housing and Technical Resources), in
consultation with the Chair and an ex officio member, to conclude the contract with Lovell
Homes. 
The site at the former Philips factory, Wellhall Road in Hamilton, had been identified within the
Council’s Strategic Housing Investment Plan as a priority site in delivering the Council’s target of
1,300 additional homes by 2027. 
The application for the development of the site had been approved by the Planning Committee
on 15 February 2022 for the erection of 163 dwellings by Lovell Homes and included an
obligation for an on-site provision of up to 40 affordable homes. 
The Council entered into discussions with Lovell Homes to provide its planning obligation for
new affordable homes via a turnkey arrangement, with the Council only paying the full amount
due on completion of each house.  The proposal provided by Lovell Homes had been assessed
by the Council’s Technical and Commercial Team as presenting value for money. 
The Executive Director (Housing and Technical Resources) had been authorised by this
Committee, at its meeting on 14 December 2022, to acquire 40 completed affordable homes
from Lovell Homes for a total price not in excess of £7 million, which included the cost of land, to
fulfil the planning obligations associated with the residential development of the site.  Through
further contractual discussions, on 1 December 2022 Lovell Homes intimated their intention to
charge VAT on the land transaction aspect of the purchase, resulting in a revision in the total
costs required to acquire the properties.
10

Page 11

The Council had been advised that Lovell Homes’ decision to charge VAT on the land
transaction stemmed from a requirement to pay VAT on their own land purchase as a
consequence of the former landowner opting to pay tax.  Therefore, an additional £188,139.51
was required to complete the transaction and authority had been requested by the Executive
Director (Housing and Technical Resources) to acquire 40 completed affordable homes at the
revised cost which would not exceed £7,188,139.51. 
The increased cost had no impact on the financial implications associated with the acquisition as
the Council would be able to re-claim the VAT paid under the special rules for recovery for local
authorities. 
The Head of Property Services responded to a member’s question on the VAT aspect of the
report. 
The Committee decided: that the action taken, in terms of Standing Order No 37(c),
by the Executive Director (Housing and Technical
Resources), in consultation with the Chair and an ex officio
member, to authorise the Executive Director (Housing and
Technical Resources), in consultation with the Head of
Administration and Legal Services, to conclude matters
and to enter into the necessary legal agreements on terms
which were of the best interests of the Council, be noted. 
[Reference: Minutes of the Planning Committee of 15 February 2022 (Paragraph 9), Minutes of
the Executive Committee of 30 November 2022 (Paragraph 7) and Minutes of 14
December 2022 (Paragraph 8)] 
12 Delegated Authority Report – Update
A report dated 3 February 2023 by the Executive Director (Housing and Technical Resources)
was submitted on transactions processed by Property Services during Quarter 3 of 2022/2023. 
The Executive Director (Housing and Technical Resources), under delegated powers, had
authority to deal with various transactions including:- 
 leases up to the value of £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
Details of the transactions undertaken during Quarter 3, as contained in Appendix 1 of the
report, were as follows:- 
Quarter 3 2022/2023:
Number of transactions 55
Total value of lease transactions £126,864 per annum
Total value of capital transactions £1,967,710
Total value of miscellaneous transactions £0 
The Committee decided: that the report be noted. 
[Reference: Minutes of 14 December 2022 (Paragraph 18)]
11

Page 12

13 Urgent Business 
There were no items of urgent business. 
14 Chair’s Remarks
The Chair advised that this was the last Committee meeting that Hazel Goodwin, Finance
Manager (Resources) and Annette Finnan, Head of Housing Services, would be attending as
they were retiring.  The Chair, on behalf of the Committee, thanked Hazel and Annette for their
many years of public service and wished them well for their future. 
Councillors Cowan and Shearer echoed the Chair’s sentiments. 
Councillor Convery left the meeting after this item of business 
15 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following items of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraph 2 of Part I of
Schedule 7A of the Act. 
16 Acquisition of Property in Netherburn
A report dated 28 February 2023 by the Executive Director (Housing and Technical Resources)
was submitted advising on the action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Housing and Technical Resources), in
consultation with the Chair and an ex officio member, to acquire a property in Netherburn. 
The Committee decided: that the following action taken, in terms of Standing Order
No 37(c), by the Executive Director (Housing and Technical
Resources), in consultation with the Chair and an ex officio
member, be noted:- 
 to acquire a property in Netherburn
 to authorise the Executive Director (Housing and
Technical Resources), in consultation with the Head
of Administration and Legal Services, to conclude all
matters pertaining to the acquisition and to enter into
the necessary legal agreements on terms which were
in the best interests of the Council 
Councillor Cowan, having declared an interest in the above item of business, withdrew from the
meeting during its consideration
12

Page 13

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – January to March 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for January to March 2023 relating to Housing
and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for January to March 2023 relating
to Housing and Technical Resources, be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report, for Housing and
Technical Resources, provides information on the position for January to March
2023. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of March 2023 for
Housing and Technical Resources. 
The Resource absence figure for March 2023 was 5.9%, this figure has increased by
0.8% when compared to last month and is 0.5% lower than the Council-wide figure. 
Compared to March 2022, the Resource absence figure has decreased by 3.1%. 
Based on the absence figures at March 2023 and annual trends, the annual average
absence for the Resource for 2022/2023 is 5.9% compared to a Council-wide
average figure of 5.7%. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work or to return to work after a sickness absence. 
3
13

Page 14

There are comprehensive employee supports in place and additionally, Personnel
Services works in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall 149 referrals were made this period.  This represents a
decrease of 33 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 13 accidents/incidents recorded within the Resource this period, a
decrease of 1 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 1 disciplinary hearing was held within the Resource, this figure
remains unchanged when compared to the same period last year.  During this period
1 appeal was heard by the Appeals Panel.  No grievances were raised within the
Resource, this figure remains unchanged when compared to the same period last
year.  No Dignity at Work complaints were raised within the Resource, this figure
remains unchanged when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There was a total of 13 leavers in the Resource this period eligible for an exit
interview.  This figure remains unchanged when compared with the same period last
year.  Six exit interviews were conducted in this period, an increase of 2 when
compared with the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period January to March 2023, 29 (23.90 FTE)
employees in total left employment.  Managers indicated that all employees will be
replaced. 
5. Employee Implications
5.1. There are no implications for employees arising from the information presented in
this report. 
6. Financial Implications
6.1. All financial implications are accommodated within existing budgets. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications in terms
of the information contained within this report. 
14

Page 15

8. Other Implications
8.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
14 April 2023 
Link(s) to Council Values/Priorities/Outcomes
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others 
Previous References
 Housing and Technical Resources Committee – 15 March 2023 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
15

Page 16

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 4.1 3.2 5.5 April 3.5 3.6 10.6 April 3.8 3.3 7.6 April 4.4 4.3 5.6
May 2.8 2.9 4.5 May 2.0 4.2 8.1 May 2.5 3.4 6.0 May 3.1 4.9 5.4
June 3.2 3.5 4.9 June 2.0 6.2 8.5 June 2.7 4.6 6.4 June 2.7 4.7 5.3
July 2.7 4.0 5.5 July 2.7 5.7 8.9 July 2.7 4.7 6.9 July 2.3 4.0 4.6
August 2.5 4.9 4.7 August 3.4 7.9 7.1 August 2.8 6.2 5.7 August 3.1 4.7 4.4
September 2.1 5.8 4.5 September 3.3 8.1 6.3 September 2.6 6.8 5.2 September 4.2 6.4 5.4
October 2.9 5.2 4.3 October 3.9 9.0 7.8 October 3.3 6.8 5.8 October 4.8 6.3 5.8
November 3.7 5.7 4.6 November 5.6 9.2 7.8 November 4.5 7.2 5.9 November 5.8 6.9 6.5
December 3.3 4.6 4.4 December 4.8 9.5 7.2 December 3.9 6.7 5.6 December 5.6 6.9 7.0
January 3.5 5.2 4.5 January 4.4 8.8 5.5 January 3.9 6.7 4.9 January 4.8 7.0 5.8
February 3.2 6.4 4.4 February 4.7 8.5 6.2 February 3.8 7.3 5.1 February 4.8 6.6 5.9
March 3.1 7.8 5.3 March 4.5 10.7 6.8 March 3.6 9.0 5.9 March 4.9 7.9 6.4
Annual Average 3.1 4.9 4.8 Annual Average 3.7 7.6 7.6 Annual Average 3.3 6.1 5.9 Annual Average 4.2 5.9 5.7
873 570 1443 16090
Council Wide
No of Employees at 31 March 2023No of Employees at 31 March 2023 No of Employees at 31 March 2023 No of Employees at 31 March 2023
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
APT&C Manual Workers
16

Page 17

HOUSING AND TECHNICAL RESOURCES
Jan - Mar Jan - Mar
2022 2023
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 53 28
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 182 149
Jan - Mar Jan - Mar
2022 2023
Specified Injuries* 1 0
Over 7 day absences 4 2
Over 3 day absences** 1 0
Minor 6 10
Violent Incident:  Verbal***** 2 1
Total Accidents/Incidents 14 13
Jan - Mar Jan - Mar
2022 2023
Total Number of Hearings 1 1
Total Number of Appeals 2 1
Time Taken to Convene Hearing January - March 2023
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 1 0
Jan - Mar Jan - Mar
2022 2023
Number of Grievances 0 0
Jan - Mar Jan - Mar
2022 2023
Number of Incidents 0 0
Jan - Mar Jan - Mar
2022 2023
Career Advancement 1 3
Personal Reasons 1 1
Travelling Difficulties 0 1
Further Education 1 0
Dissatisfaction With Terms and Conditions 0 1
Other 1 0
Number of Exit Interviews conducted 4 6
Total Number of Leavers Eligible for Exit Interview 13 13
Percentage of interviews conducted 31% 46%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
49
APPENDIX 2
41 54
13 18
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
75
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
17

Page 18

FTE H/C FTE H/C
Terminations/Leavers 23.90 29 99.49 122
Being replaced 23.90 29 98.49 121
Filling on a temporary basis 0.00 0 0.00 0
Plan to transfer this budget to another post 0.00 0 0.00 0
End of fixed term contract 0.00 0 0.00 0
Held pending service Review 0.00 0 1.00 1
Plan to remove for savings 0.00 0 0.00 0
Appendix 2a
Reason Jan - Mar 2023 Cumulative total
18

Page 19

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resource Plan 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Housing and Technical Resource Plan 2023/2024 for approval and
note the monitoring arrangements
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Resource Plan 2023/2024, attached as Appendix 1, be approved;
(2) that the Resource Plan 2023/2024 be uploaded onto the Council’s website
following consideration by this Committee; 
(3) following Committee approval, all Resource Plans will be presented to
Executive Committee on 21 June 2023, for noting; and
(4) that Progress Reports on the Resource Plan 2023/2024 be provided at
Quarter 2 and Quarter 4 to future meetings of this Committee. 
3. Background
3.1. The Resource Plans for 2023/2024 were prepared in line with the corporate
Resource Planning guidance. 
3.2. The Resource Plan is a key element of the Council’s performance management
arrangements.  It provides details of the context within which the Resource operates
and establishes actions and measures for the year ahead based on the priorities and
outcomes set out in the Council Plan Connect 2022 - 2027. 
3.3. Performance management is a keystone of Best Value and ensures that the Council
can demonstrate sound governance arrangements.  The Resource Plan is 1 part of
the Council’s framework for planning and budgeting and demonstrates how this
leads to effective front line service delivery. 
3.4. As part of this framework, the Resource Plan reflects the aspirations of the Council
Plan and the Community Plan as well as being complemented by the details of
individual Service, Business and other Plans.  Ultimately, these details are included
in the key work objectives of individual officers.  This demonstrates the ‘Golden
Thread’ of performance management which ensures a clear understanding of the
Council’s vision, values, priorities and outcomes at all levels. 
3.5. The current format for performance reporting has been established since 2007 and is
used for Executive Directors’ reports to the Chief Executive, Resource Management
Teams, Resource Committees and the Performance and Review Scrutiny Forum.   
4
19

Page 20

The focus has been on reporting progress on Council outcomes, statutory
performance indicators, other key performance measures and high level Resource
outcomes.  Progress reports are provided at Quarter 2 and Quarter 4 to this
Committee. 
3.6. In preparing the Plan, account has also been taken of the need to ensure a robust
response to Risk Management and Control.  Risks associated with delivery of the
actions in this Resource Plan have been identified and evaluated and are listed in
the Resource Risk Register.  Where necessary, controls or further actions to mitigate
these risks have been agreed.  Such actions are tracked through the Resource Risk
Control Plan which is kept under review by the Risk Sponsor for the Resource. 
3.7. Following approval at individual Resource Committees, all Resource Plans will be
presented, as a pack, to Executive Committee on 21 June 2023, for noting. 
4. Resource Plan 2023/2024
4.1. The Resource Plan 2023/2024 is attached as Appendix 1 and is structured around
the following headings:- 
i. Introduction
ii. Key areas for the year ahead
iii. Resource outcomes
iv. Measures and actions
v. Resourcing the Plan 
4.2. Resource Outcomes 2023/2024
The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2023/2024.  To support these outcomes, the Resource has
developed performance measures which are set out within the action plan, detailed
at section 4 of the Resource Plan.  Key or strategic measures will be included in the
Council Pan Connect Progress Reports 2023/2024, with the rest being monitored
and reported at Resource level. 
4.3. Monitoring and Reporting 
As part of the performance management arrangements, the Committee will receive a
mid-year update of progress on the measures in the Resource Plan covering the
period April 2023 to September 2023 (Quarter 2) as well as an end of year progress
report covering the full year April 2023 to March 2024 (Quarter 4). 
5. Employee Implications
5.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and in turn, the Performance Appraisal process for individual
employees. 
6. Financial Implications
6.1. The outcomes within the Resource Plan are reflected in the respective Resource
Revenue and Capital budgets and longer term, within the framework of the Council’s
approved Financial Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change or environmental implications as a result of this report. 
The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy. 
20

Page 21

All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2023/2024 to the full extent that funding permits. 
8. Other Implications
8.1. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
Stephen Gibson 
Executive Director (Housing and Technical Resources) 
10 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values, Priorities and
Outcomes in the Council Plan Connect 2022 - 2027 
Previous References
 None 
List of Background Papers
 Council Plan 2022-2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Sharon Egan (Head of Housing Services)
Ext:  4595  (Tel:  01698 454595)
E-mail:  sharon.egan@southlanarkshire.gov.uk 
21

Page 22

22

Page 23

Housing and Technical Resources
Housing and Technical
Resource Plan 2023-2024  
4
23

Page 24

Section Contents Page
1.0 Introduction 1
2.0 Key areas of focus for the year ahead 2
3.0 Resource outcomes  5
4.0 Measures and actions  7
5.0 Resourcing the Plan  19 
24

Page 25

1 
Section One – Introduction 
I am pleased to introduce our Resource Plan for 2023-24 which sets out our intended outcomes and
priorities for the coming year. This is the main annual business planning document for the Resource. 
It reflects the council’s key priorities as set out in the Council Plan ‘Connect’ and provides an overview
of the Resource’s main areas of activity. 
This plan demonstrates our clear commitment to deliver on the priorities set out in ‘Connect’ and the
vision, “To Improve the Lives and Prospects of Everyone in South Lanarkshire”.
There are two Services within Housing and Technical Resources which help to ensure that the council
operates successfully in an increasingly complex and challenging environment, and although diverse,
each service is essential to the running of the council and the delivery of its vision, values and priorities.
Housing Services is the fourth largest social landlord in Scotland and is responsible for providing a
comprehensive housing management service, managing 25,328 homes, including 34 Sheltered
Housing complexes and two sites and services for the Gypsy /Traveller community. Housing Services
is divided into the three distinct, yet interrelated service areas of Homelessness and housing support;
Housing Management Services and Housing Strategy and Support. We provide a homelessness and
housing support services, working to prevent and alleviate homelessness; support independent living;
improve levels of tenancy sustainment and support vulnerable households in our communities,
including refugees. At a strategic level, we have responsibility for the development and implementation
of the Strategic Housing Investment Plan (SHIP) and the Local Housing Strategy. The Service also
provides both strategic and support functions across the Resource, contributing to the Council and
national agenda, including community safety, tackling poverty, affordable warmth and the development
and delivery of additional affordable homes. 
Property Services is responsible for managing the council’s portfolio of properties and land and is
split between three services, Building Services, Assets and Estates and Consultancy Services.  These
services have a wide range of responsibilities including working with all other Resources to develop,
design, procure and, in many cases deliver property construction/improvement projects. The Service
undertakes maintenance works across the property portfolio, including the out of hours repairs service
and carries out legislative compliance works including electrical testing and gas safety checks. The
Service also manages properties for sale and lease and provides strategic support to the Resource
and the council for energy efficiency and the sustainability agenda. 
Stephen Gibson 
Executive Director
(Housing and Technical Resources)
25

Page 26

2 
Section Two – Key areas of focus for the year ahead   
2.0. Overview 
The Resource has identified the main challenges, risks and new developments which will have
significant impact on the delivery of services in the coming year.  These are outlined briefly
below. 
2.1. Cost of living Crisis 
The UK is experiencing the worst cost-of-living crisis in 40 years.  With inflation soaring into
double figures both the UK and the Scottish Government have formally recognised the severity
of the crisis and have deployed emergency measures to help mitigate the effects of rising costs.
While all sectors of society are seeing prices rise the impacts are greatest for those on the
lowest incomes.  The council recognises the immense pressures being faced by households
across South Lanarkshire and acknowledges the potential for additional pressures on council
services.  The council has identified a range of new and existing support which can help
households manage scarce resources and services will continue to explore all avenues to
support the most vulnerable in the year ahead. 
While doing all we can to support our communities in these difficult times, the council
recognises that inflationary pressures will also present significant challenges for council
services as budgets are increasingly squeezed by rising costs. 
2.2. Housing to 2040
Published in early 2021, the Scottish Government’s Housing to 2040 publication identified
significant policy changes planned for the housing sector over the next 20 years. This includes
a target of delivering 110,000 additional affordable homes across Scotland, the introduction of
a Rented Sector Strategy, including proposals to introduce new legislation aimed at aligning
standards within both the private and social rented sectors, new housing quality standards, an
emphasis on place-based strategy and accelerated energy efficiency targets. The Resource
will continue to monitor progress in relation to all aspects of this document, working with
housing, health and homelessness partners across South Lanarkshire to meet any new
requirements. 
2.3. Financial Considerations
In order to continue to maintain, invest and meet legislative requirements for council housing
and services, maximising rental income and minimising arrears will continue to be a priority for
the Resource. However, we recognise that the ongoing situation will be having a significant
impact to the financial capacity or security of many.  It is therefore our intention to continue to
set affordable rents and provide a person centred approach to supporting our tenants and
customers who face financial difficulties, while contributing to the wider tackling poverty
agenda.  The scale and nature of investment in the council’s property assets is changing as a
result of restricted budgets and new technology.  The Resource will review operational models
to ensure that property services continue to be delivered effectively and staff are upskilled. 
2.4. Preventing and Alleviating Homelessness
The Resource continues to work closely with our partners to address emerging issues and the
priorities identified in the South Lanarkshire Rapid Re-housing Transition Plan 2019-24, 
including review our supply of temporary and supported accommodation to ensure it is suitable
and is meeting identified needs as well as delivering our Housing Options service with a focus
on homeless prevention to support and assist people who are homeless or at risk of becoming
so. 
26

Page 27

3 
We will continue to work in partnership and seek to further develop person centred housing
and support packages for vulnerable households, including continued joint working with
corporate parenting partners, strengthen our pathway planning approach, and Women’s Aid
South Lanarkshire and East Renfrewshire to further develop responses to domestic abuse. 
We will continue to deliver the aims and objectives of the SHORE (Sustainable Housing on
Release for Everyone) standards, working with partners to prevent homelessness and stop the
cycle of reoffending, contributing to community safety. 
2.5. Continuing to improve the supply and availability of housing
The Resource will continue to deliver on its Home+ programme to increase the supply of council
homes through the building of new homes and purchasing existing ones from the market. To
support this, we aim to deliver an additional  1,300  council homes  by 2027. In addition, by
working with RSL partners, the Resource will also continue to meet housing needs by letting
houses efficiently, effectively and fairly. 
2.6. Provision of Services to Gypsy/Travellers
The Resource currently operates two Gypsy/Traveller sites comprising a total of 24 pitches.
The Resource will continue to work closely with residents to deliver an accommodation need
and demand assessment, and continue to implement a co-produced investment masterplan for
both sites which includes a range of investment activities including; pitch expansions, upgrades
to amenity buildings and continuing to implement measures to support fire safety on sites. 
In addition, the Resource will continue to work with the Scottish Government and COSLA to
deliver appropriate outcomes from the national ‘Improving the Lives for Gypsy/Travellers Action
Plan.’ 
2.7. Health and Social Care 
With the approval of the third Strategic Commissioning Plan, the Resource will continue to
contribute to the planning and delivery of services provided through the Health and Social Care
partnership and ensure effective alignment in relation to strategic planning for housing and
homelessness,  through two specific Directions to prioritise access to health service and ensure
appropriate referrals by health practitioners for households who are homeless 
2.8. Development of Integrated Housing and Property Management System
The development and implementation of the new integrated housing and property management
system will remain a key priority for the Resource during 2023/24. This will progress in tandem
with ensuring effective operation of existing systems to meet statutory and regulatory
requirements and further digitisation of services that will enhance our interactions with
customers and tackle digital inclusion. 
2.9. Health and Safety  
Health and Safety legislation and regulations will remain a key area for the Resource to
maximise efforts to reduce accidents and comply with all current and emerging health and
safety legislation for council buildings and housing, developing and promoting a safe
environment for employees, tenants and customers.   
2.10. Sustainable Development and Climate Change
The council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency and in
Scotland’s transition to a net-zero and climate resilient society and economy. 
To the full extent that funding permits, the Resource will continue to manage the property and
land assets as well as the commercial portfolio of the council, ensuring it continues to meet
requirements in terms of scale, location, condition, suitability and corporate image. 
27

Page 28

4 
The 2023/24 Housing Capital Programme reflects the level of investment required to continue
to maintain the Scottish Housing Quality Standard and to increase the proportion of homes that
meet the Energy Efficiency Standard for Social Housing by December 2032 (EESSH2). 
The Scottish Government will require all new domestic buildings to be installed with a
decarbonised heating source and will not be able to be connected to the existing gas network,
through a New Build Heat Standard which is proposed to be introduced in 2024. Significant
planning will be required to meet this new requirement, including changes to suppliers and
procurement routes as well as training and restructuring existing services. 
2.11. Refugee Re-settlement Programme and Asylum Dispersal 
The Resource will continue to manage and support the refugee resettlement programmes for
families who arrive in South Lanarkshire through the following visa schemes: the UK
Resettlement Scheme, the Afghanistan Relocation and Assistance Policy, the Afghan
Resettlement Programme and the Homes for Ukraine scheme. We will work in partnership with
relevant agencies to support new arrivals and ensure that families move to settled
accommodation as quickly as possible. 
The Resource will also coordinate the council and partners involvement in the asylum seeker
dispersal programme.   
28

Page 29

5 
Section Three – Resource outcomes 
3.1. Resource Outcomes
The Resource has established the following outcomes to support the delivery of Connect
Outcomes in 2023-2024. 
Connect Outcomes Resource Outcomes
Communities and
Environment
• Work with communities to create safe, strong
sustainable places
• Increased ownership of local assets 
Education and Learning • No Resource outcomes for this Connect
outcome.
Health and Wellbeing • Support people to live active and
independent lives
• Help people to continue to live within their
homes and communities through integrated
community health and social care services
Children and Young
People
• Improve the health and wellbeing of children,
young people and families
Housing and Land • Support people to access and sustain
housing which meets their needs through our
Integrated Housing Options service
• Provide a comprehensive range of services
to help prevent and alleviate homelessness
including the provision of suitable temporary
and supported accommodation
• Continue to deliver an affordable housing
programme to meet needs
• Manage the council’s portfolio of properties
and land
• Ensure our repairs service continues to meet
the needs of customers
• More energy efficient council homes
• Continue to engage and work with tenants
and other customers to design our services
• Provide high quality services to our service
to our tenants, including those who live in
sheltered housing and residents at our
Gypsy / Travellers sites
• Improved outcomes for households
experiencing homelessness, including
access to settled accommodation
• Work to bring empty homes back into use to
help meet needs within South Lanarkshire
• Continue to develop a range of properties to
meet the council needs
• Deliver a first-class repairs and maintenance
service
• Work with property owners and landlords to
make sure our private housing is suitable for
the needs of our residents
Our Economy • Help create town centres that offer a social,
cultural and economic heart to a community
and contain shared built environment,
29

Page 30

6 
heritage and spaces that, with the right
conditions, provides inclusive and
sustainable centres 
3.2. Delivering the Plan and achieving Best Value
In working towards the six Outcomes, the council aims to continually improve and ensure
effective and efficient use of resources, and our business will be conducted with integrity,
transparency and will operate to the highest standards. 
Housing and Technical Resources has established the following Resource outcomes which
specifically aim to support delivery of the plan  and achieving best value.
Delivering the Plan and
achieving Best Value
Resource Outcomes
• Digital and ICT services meet the needs of
its customer 
• Customers experience high quality and
improving council services
• The council demonstrates high standards of
governance and sound financial stewardship
• The workforce has the skills, flexibility and
capacity to deliver the council’s outcomes 
30

Page 31

7 
Section Four – Measures and actions 
4.0. Performance measures and action plan
This section of the Resource Plan is divided into two parts: part (a) sets out our main
performance measures against our outcomes; and part (b) describes the key actions we will
take in the coming year to respond to the challenges ahead and improve services and
outcomes. 
4.a. How we will measure our performance
The ongoing effects of COVID-19 continue to have a significant impact on performance for
some services. The table below shows our performance measures, with data for the last two
years and the target for 2023-24 and additional context for the targets is detailed within the
notes column where applicable. 
Resource Outcome:   Support people to access and sustain housing which meets their needs through
our Integrated Housing Option Service 
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
1. % of lets to
Urgent
housing (UH)
need
households
(locally set
target)
56.59% 58.14% 
55% to
65% 
C05.01 Housing The target is set between
55% - 65% to ensure
progress is made towards the
priorities and targets set
within RRTP. Target
approved by HTR Committee
on 15/3/23 as part of Local
Letting Plan Report.
2. % of new
tenancies
sustained for
more than a
year for all lets 
(locally set
target)
93.4% 92% 88%  SSHC 
C05.01 
Housing 
Tenancy sustainment has
remained strong in year,
significantly above target.
3. % of tenancy
offers refused
during the
year
(N/A)
16.6% 23.38% N/A SSHC 
05.01 
Housing This is a contextual indicator
as refusals are driven by the
applicant and can vary
significantly depending on
size/availability/location of
housing.
This indicator is required for
the Scottish Housing
Regulator charter return and
is used to benchmark against
all other Scottish LA’s. 
4. Average time
taken to re-let
empty
properties
(locally set
target)
21.51
days
27.76
days 
30 days 05.16 
SSHC
Housing This continues to be a key
focus for the Resource with a
Voids Working Group
established to closely monitor
and identify improvement
actions. 
Performance against this
Charter measure is
consistently good and SLC
remains one of the top
31

Page 32

8 
performing councils in void
management.
Resource Outcome:   Provide a comprehensive range of services to help prevent and alleviate
homelessness including the provision of suitable and temporary and supported
accommodation 
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
5. Average
length of time
in temporary
accommodatio
n
(locally set
target)
105 days 95.7 days 120 days SG 
05.02
Housing The target has been set,
taking account of the
continued uncertainty in
relation to turnover/
availability of permanent
housing solutions and the
demand for homelessness
services. 
6. % of
households
provided with
temporary
accommodatio
n
(nationally set
target)
100% 100% 100% SG 
05.02
Housing Consistently excellent
performance against indicator
which is reported to the
Scottish Government.
7. % of
temporary
accommodatio
n offers
refused
(locally set
target)
7.42% 6% 6%  SG 
05.02
Housing Performance has improved in
the year and will continue to
be monitored closely. 
8. Number of
times we did
not meet our
obligation to
provide
suitable
accommodatio
n
(nationally set
target)
0 0 0 SG 
05.02
Housing
Good performance against
national requirement 
Resource Outcome:  Improved outcomes for households experiencing homelessness, including
access to settled accommodation
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
9. % of
homeless
households
advised of
outcome of
assessment
within 28 days
(locally set
target)
99.6% 95.2% 95%  SG 
05.15
Housing Slight drop in performance
due to new service
arrangements implemented in
first half of year. Performance
returned to previously high
levels second half of year. 
This is a locally set target and
is a key focus for the
Resource and continues to be
closely monitored by
management. 
32

Page 33

9 
10. % of Housing
Options
interventions
where
Homelessnes
s prevented
(locally set
target)
73.48% 65.92% 70%  C05.15 Housing This is a locally set target and
is a key focus for the
Resource. 
The operating context in
relation to the prevention of
homelessness has proven to
be extremely challenging in
the year. The prevailing socio-
economic conditions
adversely impacted upon the
ability to prevent
homelessness during
2022/23.
This trend has been mirrored
nationally  
Resource Outcome:  Ensure our repairs service continues to meet the needs of customers 
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
11. % of response
repairs
completed on
time
(nationally set
target)
99.1% 95.3% 90% C05.16 Property This measure is a statutory
requirement and is also used
for benchmarking returns.   
Slight drop in performance
due to the ongoing onset of
Covid 19 and the impact of
severe weather.
12. Average
length of time
to complete
emergency
repair
(contracted
target)
4 hours
24
minutes
5 hours
36 mins
24 hours
(contracted
target)
SSHC 
05.16
Property
This target is a contractual
arrangement and is a Charter
requirement of the Scottish
Housing Regulator. 
13. Average
length of time
to complete
non-
emergency
repair
(contracted
target)
11.76
days
11.63
days
28 days
(contracted
target)
SSHC
LGBF 
05.16
Property
This target is a contractual
arrangement and is a Charter
requirement of the Scottish
Housing Regulator. 
14. % of reactive
repairs
completed first
time right
(nationally set
target)
99.76% 99.6% 90% SSHC 
05.16
Property This target is nationally set
and is a statutory requirement
for the Scottish Housing
Regulator. 
15. % of repairs
appointment
kept
(nationally set
target)
94% 100% 90% SHN 
05.16
Property This indicator is a statutory
requirement and is also used
for benchmarking returns.   
16. Number of
times we did
439 20 0 SSHC  Property As result of the residual
impact of COVID-19 and
33

Page 34

10 
not, meet our
obligation to
complete the
annual gas
safety check
by annual
anniversary
date
(nationally set
target)
05.16 tenants refusing access due
to self-isolation as well as
occasions where it was not
considered appropriate to
carry out a service, has
resulted in target not being
achieved.  
Resource Outcome:  Deliver a first-class repairs and maintenance service
Measure  2021-22 2022-23  2023-24  
Target  Links Service Notes
17. % of tenant
satisfaction
with repairs or
maintenance
in year
(locally set
target)
91% 89%  90% SSHC 
05.08
Property
This target is to maintain
performance at 90% and is a
charter requirement for the
Scottish Housing Regulator. 
Resource Outcome:  More energy efficient homes  
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
18. % of council
stock meeting
the SHQS 
(locally set
target)
72.25% 80.00% 90%  SSHC 
05.17
Property The changes to the Fire
Tolerable standard has
continued to impact on the
SHQS pass rate due to the
lack of supplies of the alarms.
We have also experienced
difficulties with gaining access
to properties to carry out
Fixed Electrical Testing.
19. % of council
dwellings that
are Energy
Efficiency
Standard for
Social
Housing 2
(EESSH2)
(N/A)
6.48% 7.39% No target
as
currently
subject to
review 
C05.17 Property Reporting to the Scottish
Government against this
indicator has ceased. New
indicators are currently being
devised as part of a national
review. 
In advance of the new
national indicators, a review
of housing stock is underway
to determine the additional
energy measures required to
achieve energy efficiency and
carbon reduction
requirements within the
council’s housing stock.   
Resource Outcome:  Work with communities to create safe, strong and sustainable places 
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
20. % of Anti-
Social
Behaviour
94.3% 96.8% 90% SSHC 
01.01
Housing Performance continues to be
strong against this indicator
34

Page 35

11 
cases
resolved in the
year
(locally set
target) 
Resource Outcome:  Support people to live active and independent lives 
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
21. Number of
adaptations
completed in
Council
homes
(locally set
target)
933 1,266 100% of
requests
received
03.01 Property Performance in this area is
demand led - numbers are
contextual and can vary
significantly from year to year.
We have updated the target
to 100% of adaptations
received. 
22. Number of
households
currently
waiting for
adaptations to
their home
(locally set
target)
0 0 0 C03.01 Property This is a locally set target and
has been consistently
achieved over a number of
years. 
23. % of approved
applications
for
adaptations
completed in
year
(locally set
target)
100% 100% 100% SSHC 
C03.01 
Property This target is a local target
and indicator is a statutory
requirement for the Scottish
Housing Regulator. 
This target has been
consistently achieved over the
past years.
24. Average time
(working days)
to complete
applications
(nationally set
target)
23.49
days
21.72
days 
28 days SSHC 
03.01
Property This target is a contractual
arrangement and indicator is
a statutory requirement for the
Scottish Housing Regulator. 
25. % of standard
adaptations to
council
houses within
agreed
appointment
times
(nationally set
target)
98.3% 90.1% 90% C03.01 Property This target is a contractual
arrangement and indicator is
a requirement for
benchmarking returns.   
26. % of new build
that are
wheelchair
accessible
(locally set
target)
N/A N/A 10% C03.01 Housing/
Property Target is determined through
demand analysis achieved
through the regional Housing
Need and Demand
Assessment and local
35

Page 36

12 
discussions with social
housing providers.   
Resource Outcome:  Customers experience high quality and improving council services
Measure 2021-22 2022-23 2023-24
Target Links Service Notes
27. % of Stage 1
complaints
responded to
in full
(nationally set
target)
91% 95% 100% SSHC 
07.01
Housing/
Property
This is a nationally set target
and indicator is a statutory
requirement for the Scottish
Housing Regulator.
28. Average time
in working
days for a full
response at
Stage 1
(nationally set
target)
5 days 5.2 days  5 days SSHC 
07.01
Housing/
Property
This is a nationally set target
and indicator is a statutory
requirement for the Scottish
Housing Regulator.
29. % of Stage 2
complaints
responded to
in full
nationally set
target)
100% 88% 100% SSHC 
07.01
Housing/
Property
This is a nationally set target
and indicator is a statutory
requirement for the Scottish
Housing Regulator. 
Complaints continue to be a
focus for management and
are routinely monitored. As a
result, the numbers remain
consistently low, which in turn
can have a detrimental impact
on the overall percentage. 
30. Average time
in working
days for a full
response at
Stage 2
(nationally set
target)
15 days 15 days 20 days SSHC 
07.01
Housing/
Property
This is a nationally set target
and indicator is a statutory
requirement for the Scottish
Housing Regulator.
Resource Outcome:   The council demonstrates high standards of governance and sound financial
stewardship 
31. Rent collected
as a % of rent
due in the
year
(locally set
target)
98.3% 99.10% 99.31% SSHC 
07.02
Housing Performance in this area has
been strong in the year
against extremely challenging
socio-economic environment.
It will continue to be an area
of focus in the 2023-24 and
monitored and reported at a
senior management level. 
32. Gross rent
arrears
(current and
former
tenants) as a
8.91% 8.66% 9.01% LGBF
SSHC 
07.02
Housing Performance against this
indicator has improved
despite the challenging socio-
economic environment. It will
continue to be an area of
36

Page 37

13 
% of rent due
for the year
(locally set
target)
focus in the forthcoming year
and monitored and reported
at a senior management level. 
33. % of rent due
in the year
that was lost
due to voids
(Operational
void rent loss)
(locally set
target)
0.6% 0.62% 0.62% SSHC 
07.02 
Housing Performance impacted by
void repair performance and  
associated challenges. It will
continue to be an area of
focus in the forthcoming year
and monitored and reported
at a senior management level. 
34. % of total void
rent loss
(locally set
target)
1.53% 1.41% 1.42% SSHC 
07.02
Housing Performance will continue to
be an area of focus in the
forthcoming year and
monitored and reported at a
senior management level as
well as a statutory
requirement for the Scottish
Housing Regulator. 
35. Factoring
collection rate
(locally set
target)
73% 72.2% 75% C07.02 Property Target set by Finance and
Corporate Resources. 
4.b. What actions we will take in 2023-2024 
Resource Outcome: Continue to deliver an affordable housing programme to meet needs 
Action Milestones/Steps we will take to deliver our actions Links Service
1. Increase the number of
new affordable homes
(NH)
Total new/additional affordable homes delivered per SHIP
and reported to HTR Committee. 
C05.10  Housing/
Property
Resource Outcome:   Work to bring empty homes back into use to help meet needs within South
Lanarkshire
2. Physical regeneration
work in priority areas
Work with partners to bring 15 Long Term empty homes
into use by March 2024.
C05.07  Housing/
Property 
Resource Outcome:    Continue to develop a range of properties to meet the council needs
3. Increase supply of
housing suitable for
older people (NH)
Continue to adapt  suitable homes, as identified at the void
stage, to Amenity standard. 
Total new amenity homes delivered through AHSP and
reported to HTR Committee through the SHIP 
C05.09 Housing/
Property
Resource Outcome:   Support people to access and sustain housing which meets their needs through
our Integrated Housing Option Service
Action Milestones/Steps we will take to deliver our actions Links Service
37

Page 38

14 
4. Understand the
financial security of our
customers 
Provide a programme of support to our customers including
– 
• The offer of tailored support to 100% of tenants who go
on to receive Universal Credit
• Tenancy Sustainment Fund to support tenant
experiencing financial difficulties sustain their tenancy 
As part of rent setting process - 
• Complete analysis of the affordability of our rents by
December 2023.
Consult with tenants regarding proposed rent levels by
December 2023.
05.01 Housing
5. Development and
implement Local
Housing Strategy for
2022-27
Annual Review completed and approved by Executive
Committee in November 2023. 
C05.01 Housing    
Resource Outcome:    Improved outcomes for households experiencing homelessness, including
access to settled accommodation
Action Milestones/Steps we will take to deliver our actions Links Service
6. Improve access to
settled accommodation
for homeless
households 
Continue to implement Rapid Rehousing Transition Plan
delivered including – 
Implement Housing First approach, provide suitable
accommodation and support for up to 40 individuals with
complex needs by 2023/24. 
Increase settled accommodation by converting 10 to 15
temporary accommodation units to Scottish Secure
Tenancies during 2023/24. 
We will continue to make progress towards our target of
converting up to 100 temporary accommodation units to
Scottish Secure tenancies by 2024. 
Reduce and maintain repeat instances of homelessness to
below 4.5% of all cases during 2023/24 (RRTP aim is <3%
over life of plan)
Review of Commissioned Services exploring opportunities of
partnership working for efficiencies and to lever in funding
that will add value to existing homelessness services. 
C05.15 Housing
Resource Outcome: Work with communities to create safe, strong sustainable places
Action Milestones/Steps we will take to deliver our actions Links Service
7. Community Safety
priorities are achieved
(NH)
Implement the recommended next steps of the review of
the Safer South Lanarkshire Board and associated
structure, ensuring that reporting requirements around
police and fire scrutiny, anti-social behaviour and
community justice are appropriate 
A project to upgrade the public space cameras and install
new cameras at identified hotspots not currently covered by
C01.01  Housing
/
Property
38

Page 39

15 
CCTV is due to complete during 2023/24. These measures
will allow the council to provide a significantly more effective
support function to the police and increase public safety. 
Contribute to the Environmental Task Force to address
graffiti, vandalism and fly tipping. 
Review the Anti-Social Behaviour Strategy.
01.01
8. Review of rural action
plans to improve
sustainability
Rural action plans will be reviewed with rural communities
every two years
1.01 Housing
Resource Outcome:   Continue to engage and work with tenants and other customers to design our
services
Action Milestones/Steps we will take to deliver our actions Links Service
9. Develop and implement
Customer Involvement
Strategy
The new Customer Involvement Strategy will be developed,
consulted, and approved by Housing and Technical
Resources Committee by September 2023.
05.12 Housing
10.Ensure effective
involvement with
tenants and other
customer groups
Annual Scrutiny Programme 2023/24 developed August
2023 and implemented by March 2024. 
Customer Engagement Programme agreed with tenant
representatives by August 2023. 
C05.12 Housing
11.Service development is
informed by
understanding our
customer satisfaction
levels of key service
areas
Customer Satisfaction Programme developed and
approved by July 2023. 
Results are reviewed quarterly, and any improvement
activities are identified and incorporated into service and
resource planning cycles. 
SSHC 
05.12
Housing/
Property
Resource Outcome: Provide high quality services to our service to our tenants, including those who   
live in sheltered housing and residents at our Gypsy / Travellers sites 
Action Milestones/Steps we will take to deliver our actions Links Service
12.Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement 
Continue to deliver co-produced Site Masterplans at both
sites, reflecting council and resident priorities.     
Work in 2023/24 will continue with key projects including
new pitches, play parks and upgrade of amenity units.
C05.03 Housing
13.Ensure that Sheltered
housing services are
compliant with Care
Inspectorate inspection
standards
Complete Quality assurance checks to monitor and ensure
compliance with care inspectorate standards. Each of the
34 sheltered housing complexes will be checked during
2023/24 with findings of completed checks reported on a
quarterly basis.
C05.03  Housing
Resource Outcome: More energy efficient council homes 
Action Milestones/Steps we will take to deliver our actions Links Service
14. Improve energy
efficiency stock to help
address fuel poverty
(NH)
Deliver Housing Investment Programmes to ensure as
many socially rented properties as practically possible
achieve the Energy Efficiency Standard for Social Housing
(EESSH2) by 2032. 
C05.17 
05.17
Property
39

Page 40

16 
Maximise the energy efficiency of homes to help with
household bills and build towards net zero. 
Develop and implement South Lanarkshire Local Heat and
Energy Efficiency Strategy (LHEES) and associated
Delivery Plan. 
To contribute to national fuel poverty targets, the council will
undertake a review to identify the proportion of households
within its housing stock that are in, or are susceptible to
being in, fuel poverty. 
Develop feasibility studies for proposed district heating
systems at the multi storey blocks in East Kilbride and
Hamilton. 
Improve homes and the housing environment for residents
by continuing to invest in fabric upgrade. 
05.17 
05.17
Resource Outcome: Improve the health and wellbeing of children, young people and families 
Action Milestones/Steps we will take to deliver our actions Links Service
15. Contribute to effective
joint working to protect
and promote the
wellbeing of children,
young people and
adults
100% of households identified as at risk are referred to
appropriate statutory agencies. 
04.04 Housing/
Property
Deliver key actions detailed in the Local Child Poverty
Action Report during 2023/24 within the following areas: 
• Reducing the costs of housing for families including
energy costs;
• Investment to increase new affordable housing
supply;
• Preventing and reducing homelessness for
households, including families with children and
young people 
04.04 Housing
Continue to deliver the SHORE Standards (Sustainable
Housing on Release for Everyone) standards, by providing
appropriate support to 80% of individuals leaving prison
with identified housing need
04.04 Housing
100% of young people moving on from care offered housing
options appointment, and of those requiring Housing
Service assistance, 100% supported to move onto suitable
and sustainable housing via a personal housing pathway
plan.
04.04 Housing
Resource Outcome:   Work with property owners and landlords to make sure our private housing is
suitable for the needs of our residents
Action Milestones/Steps we will take to deliver our actions Links Service
16. Provide support and
assistance to owner
occupiers and landlords
helping them to meet
their responsibilities of
maintain and repair to
their homes. 
Conduct review of Scheme of Assistance Policy during
2023/24. 
05.06 Housing /
Property
Resource Outcome:   Help people to continue to live within their homes and communities through
integrated community health and social care services
Action Milestones/Steps we will take to deliver our actions Links Service
40

Page 41

17 
17.Ensure effective
contribution to health
and social care
outcomes contained
within the Strategic
Commissioning Plan
In line with Homelessness related Directions within the
Strategic Commissioning Plan 2022-25 pilot routine enquiry
within identified front line homelessness services and
develop plan to support full roll out across health and care
services. 
C03.08 Housing
Resource Outcome:    Increased ownership of local assets
Action Milestones/Steps we will take to deliver our actions Links Service
18. Support sustainable
Community asset
transfer (NH)
Further promote the community asset transfer process and
support communities to develop sustained applications
target 3. 
01.16 Property
Resource Outcome:   Manage the Council’s portfolio of properties and land 
Action Milestones/Steps we will take to deliver our actions Links Service
19. Project Management of
General Services
Projects
The General Services Programme spend will be achieved
for the financial year. 
C05.11 Property
Clyde Terrace, Bothwell commencing with completion in
2023. 
05.11 Property
New Jackton Primary School is due for completion in 2023. 05.11 Property 
20.Review of operational
assets and reduction in
the number of properties 
Continue to engage with all Council Resources and public
sector partners during 2023/24 to ensure continued
progress towards establishing a core estate through
property rationalisation and investment. 
A review of operational assets in each area will identify
opportunities to rationalise, reuse and redevelop to create
sustainable property portfolio.
05.11 Property 
21.Review of office
accommodation in light
of changing working
patterns 
Develop and implement a new 5 year office strategy and
action plan. 
Condition is assessed as the percentage of floor space of
operational buildings which are in a satisfactory condition. 
Suitability is assessed as the percentage of operational
buildings which are considered to be suitable for service
delivery. 
05.11 Property 
22. Progress towards
decarbonisation on the
non housing estate
The council will develop a programme for reducing
emissions within its non-domestic building stock, aiming for
heat to be delivered by zero carbon technology by the 2038
backstop. 
Complete feasibility studies to identify and cost the energy
efficiency measures and heating system replacement works
that will be required to decarbonise heat by 2038 across the
council’s wet leisure and primary school estate. 
Achieve energy efficiency and carbon emissions reductions
through delivery of the CEEF programme. 
05.11 Property 
41

Page 42

18 
Resource Outcome: Help create town centres that offer a social, cultural and economic heart to a
community and contain shared built environment, heritage and spaces that, with
the right conditions, provides inclusive and sustainable centres
Action Steps we have taken to deliver our actions Links Service
23.Ensure effective
development of
opportunities
Support the development of opportunities to re-envision and
redevelop town centres
06.04 Property
Resource Outcome: The Council demonstrates high standards of governance and sound financial
stewardship
Action eps we have taken to deliver our actions Links Service
24.Ensure effective
management of all
Resource budgets and
Business Plans
Overall budgetary target achieved by March 2024. 07.02 Housing/
Property
Resource Outcome:  Digital and ICT Services meet the needs of the council and its
customer
25.Progress the council’s
Digital Strategy within
the Resource
Progress the implementation of a new Integrated Housing
and Property management System, including sourcing a
new supplier and contract negotiations. 
07.04 Housing/
Property
42

Page 43

19 
Section Five – Resourcing the Plan 
5.0. Introduction 
In this section we consider the resources needed to implement our plan, including funding and
staffing. 
5.1. Revenue Budget 2023-24
The Resource has a Net Revenue Budget of £13.630 million for 2023-24. The table below
allocates this budget across the services: 
NET Budget by Service 2023-24
Detail £ million %
Housing Services 8.373 61%
Property Services 5.257 39%
Total 13.630 100% 
5.2. Capital Budget 2023-24
The following capital budget of £63.916 million is allocated to the Resource for 2023/24: 
Capital Programme 2023-24 
Project  £ million 
Housing Revenue Account (HRA) Capital (new projects)  63.916 
Total  63.916 
5.3. Resource Employees 
The Resource has 1,434 employees as at February 2023. We support these employees to
deliver their duties through a range of policies including personal appraisal and a robust
training framework.   
The number of employees (per headcount) by service is as follows:
Service Number of
employees 
Housing Services  484 
Property Services  950 
Total  1,434 
43

Page 44

44

Page 45

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Pavilion at Alexander Hamilton Memorial Park,
Stonehouse – Asset Transfer to Friends of Stonehouse
Park 
1. Purpose of Report 
The purpose of the report is to:- 
 advise the Committee of the request for asset transfer, by lease, of the pavilion
within Alexander Hamilton Memorial Park, Stonehouse to Friends of Stonehouse
Park and request approval to the principal terms and conditions of asset transfer
as set out in Section 5 of the report 
2. Recommendation(s) 
The Committee is asked to approve the following recommendation(s):- 
(1) that the pavilion at Alexander Hamilton Memorial Park, Stonehouse be leased to
Friends of Stonehouse Park, subject to the terms and conditions outlined in
Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
3. Background
3.1. The Council owns a pavilion within the Alexander Hamilton Memorial Park,
Stonehouse.  The property houses electrical equipment that serves the wider park,
however, has not been used as a pavilion for many years and is in poor condition. 
3.2. Friends of Stonehouse Park is a local community organisation that has been working
in partnership with the Council to deliver projects and run local events in the park. 
3.3. Friends of Stonehouse Park submitted a request for Community Asset Transfer of the
pavilion, by lease, the validation date for which was 11 January 2023. 
3.4. In addition to placing the application and supporting documentation on the Council’s
Planning Portal, notices were placed on the property advising that the Council was
considering an asset transfer.  The closing date for responses was 6 March 2023 at
which time 31 representations were received, all supportive of the proposal. 
3.5. The request was placed before the Community Asset Transfer Assessment Panel
when the following matters were taken into consideration. 
5
45

Page 46

3.6. Property
3.6.1. The property, as shown on the attached plan, consists of a former pavilion set within
Alexander Hamilton Memorial Park, Stonehouse.  A single storey brick building with a
pitched roof, this property has been vacant for some considerable time and is in a very
poor condition. 
3.6.2. The property does not have an independent vehicular access and therefore, in any
lease agreement, the group will have exclusive occupation of the building but can only
be given non-exclusive access rights through the park.  There are private residencies
within the park which share the existing access arrangements. 
3.6.3. The pavilion houses electrical equipment that services the wider park and alterations
will be required to ensure that the Council can continue to access this equipment. 
3.6.4. The Council has a clear and marketable title, however, the existing lease with South
Lanarkshire Leisure and Culture will require to be terminated. 
3.6.5. The Planning Service has indicated that planning Consent will be required for change
of use. 
3.6.6. The in-house Valuer has placed a rental value of £1 per annum on the property which
reflects the level of investment required to bring the property back into use and its
location within the public park. 
3.7. Organisation
3.7.1. Friends of Stonehouse Park is a Scottish Charitable Incorporated Organisation
(SCIO), Scottish Charity No. SC052194.  The organisation has been running for over
7 years and became a SCIO in 2023.  The constitution contains an “asset lock”
requiring that if the organisation ceased to exist, the ownership of the land would
transfer to another charitable organisation with similar objectives. 
3.7.2. The organisation has 20 members, a Board who has private business experience and
has held positions in other community organisations, secured funding from various
sources and delivered community projects as well as have a wider pool of volunteers. 
3.7.3. The objectives of the organisation are:- 
 the provision of recreational facilities and the organisation of recreational
activities within the Alexander Hamilton Memorial Park
 the advance of citizenship or community development by hosting and
encouraging community participation at events within the park 
3.7.4. The Friends of the Stonehouse Park have been arranging and delivering events within
the park since 2014 and have worked in partnership with the Council to secure the
£225,000 funding for the refurbishment of the park’s band stand and a range of other
projects. 
3.8. Project
3.8.1. The proposal is for a 15-year lease followed with phased investment in the property. 
Initially the electrical equipment access will be created and the wind and watertight
repairs will be undertaken to allow the organisation to store all of its equipment and
supplies. 
46

Page 47

3.8.2. The property will ultimately be refurbished, by Friends of Stonehouse Park, to provide
a Community Hub with kitchen/café, toilets and meeting space, and be available to
other community organisations such as the Rugby Club, Scouts, etc. 
3.8.3. There is no detailed “business plan” accompanying the application, however, the initial
running of the facility as a store will incur low revenue costs and the Friends of
Stonehouse Park accounts show adequate accessible funds and an ability to regularly
raise funds through applications to funders and local events/activities. 
3.8.4. A funding application is being made to the Council’s SLC Community Asset Transfer
fund for the costs of redesigning the electrical supply area to enable external and
secure access.  This work will be carried out by the Council. 
3.8.5. At the time of writing the report, no funding applications have been submitted in respect
of the wind and watertight repairs although the group has used an architect to assess
the property and obtained an initial quote for the work. 
4. Assessment
4.1. Friends of Stonehouse Park has an established and experienced Board, stable
membership and a track record of delivering successful events within the park and
working well with Council’s Land Services. 
4.2. The scale of the project is such that risks are considered to be minimal and the
proposal is likely to be viable and sustainable.  However, planning consent will be
required for change of use and the exact sources of funding are still to be identified. 
4.3. The community benefits derived from the proposal relate to health and wellbeing, and
promotion of high quality, thriving and sustainable communities. 
4.4. Within its asset transfer request, Friends of Stonehouse Park requested transfer by
lease at a nominal rental of £1 pa.  The Community Asset Transfer Working Group
assessed the potential community benefits and recommend that a discount of 100%
be applied.  As this is a request for a lease and the rental value is nominal the
requested rent of £1 pa is recommended. 
5. Proposal
5.1. It is proposed to grant a lease of the pavilion at Alexander Hamilton Memorial Park,
Stonehouse, as shown on the attached plan, to Friends of Stonehouse Park, on the
following principal terms and conditions:- 
i. the lease will be for 15 years
ii. the rental is £1 per annum if asked
iii. the use will be for a community hub and store
iv. the tenants would be responsible for all repairs and maintenance 
v. the tenants would be responsible for all necessary insurances required in
connection with their occupation and use of the site including public liability
insurance 
vi. full details of any proposed alterations to be provided to the Council for landlord’s
consent
vii. date of entry to be agreed
viii. each party to bear their own legal fees, tenants to pay registration fees and Land
and Buildings Transaction Tax (LBTT) if required
ix. tenants to obtain all necessary statutory consents including planning and building
standards required for their use of the premises
47

Page 48

x. assignation will not be permitted; subletting permitted subject to landlord’s
consent
xi. tenants will be responsible for any rates or other property charges resulting from
their occupation and use of the subjects 
5.2. The offer of lease will be conditional upon:- 
 The tenant securing any necessary planning consent for change of use
 Suitable funding being secured for:-
o the initial set up of access to electrical equipment
o the phase 1 wind and watertight repairs
 A long stop date of 18 months for the lease to be entered into, failing which the
Council can withdraw from the transaction 
6. Employee Implications
6.1. There are no employee implications for South Lanarkshire Council. 
7. Financial Implications
7.1. The proposed asset transfer removes the future liability for the maintenance of the
pavilion and secures investment in the building. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015 the Council has until
11 July 2023 to provide a notice of its decision whether to agree to or refuse the asset
transfer request. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale or the asset transfer request be refused. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community, Land Services, Planning, Legal,
and Finance Services as well as having been published for public consultation. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
24 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
 None 
48

Page 49

List of Background Papers
 Asset Transfer Application Ref CAT/23/0002 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
49

Page 50

50

Page 51

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject:   The Fountain, 9-11 Abbeygreen, Lesmahagow – Lease
to Lesmahagow Development Trust 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for a lease of The Fountain, 9-11 Abbeygreen,
Lesmahagow to Lesmahagow Development Trust and seek approval to the
principal terms and conditions as set out in Section 5 of the report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the subjects at The Fountain, 9-11 Abbeygreen, Lesmahagow be leased to
Lesmahagow Development Trust subject to the terms and conditions outlined in
Section 5 of the report; and 
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. The subjects at The Fountain 9-11 Abbeygreen, Lesmahagow were, until recently,
managed by South Lanarkshire Leisure and Culture (SLLC). 
3.2.  Following a review of its business plan, the SLLC Board announced that it could not
sustain service delivery from this facility and control was returned to the Council. 
3.3. Lesmahagow Development Trust approached the Council with a request for an annual
lease of the subjects to enable the facility to re-open for community use as quickly as
possible.  The lease will enable them to operate the facility whilst testing the viability
of a future Community Asset Transfer (CAT). 
3.4. This is not a formal CAT request in terms of the Community Empowerment (Scotland)
Act 2015, however, similar matters have been considered. 
3.5. Property
3.5.1. The extent of the property is shown on the attached plan and as there is no change of
use or development, proposed planning consent will not be required. 
6
51

Page 52

3.5.2. Part of the subjects at 9 Abbeygreen are currently leased to Bank of Scotland and this
area will be excluded from the lease to Lesmahagow Development Trust and remain
with the Council. 
3.5.3. The upper floor of the property is a former flat which is in poor condition.  Lesmahagow
Development Trust is happy for the flat to be included in the lease subject to the
outcome of their building condition survey. 
3.6. Organisation
3.6.1. Lesmahagow Development Trust is a charitable company limited by guarantee
Company Registration No SC364744.  The Trust has been operating since 2009, owns
a number of properties and has considerable funds and income streams. 
3.6.2. The purpose of the organisation is to provide facilities, activities and resources to the
residents of Lesmahagow.
3.7. Project
3.7.1. The proposal is for Lesmahagow Development Trust to initially re-open the facility as
a community hall and office then, through their management, develop additional
activity which will evidence a sustainable operating model and support a future CAT
application.  The grant of an annual lease will allow the organisation to assess the
viability of the proposal and develop proposals for a future, longer term agreement or
purchase. 
3.7.2. The organisation has a number of ideas for the expansion of the use of the facility,
however, is keen to limit the impact of the hall’s closure on local community groups
such as the local church, whilst it develops its proposals.  It is also keen for the lease
to be in place for mid-June to support the local Highland Games which will take place
on 17 June 2023. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and funds to manage the facility. 
4.2. The grant of the annual lease will enable the facility to re-open and relieve the Council
of the costs of empty property rates, utility charges, insurance costs and repairs. 
4.3. The risks associated with the proposed lease are considered low, given both the status
of the organisation and that the request is for a year-to-year lease. 
4.4. The Council has no alternative operational requirement for the subjects.  Should the
lease prove unsustainable for the Trust, the Council will have the ability to resume full
ownership and consider the future of the property, however, it is anticipated that a
formal application for CAT will be forthcoming. 
5. Proposal
5.1. It is proposed to lease the subjects at The Fountain, 9-11 Abbeygreen, Lesmahagow
to Lesmahagow Development Trust on the following principal terms and conditions:- 
i. the lease will be to Lesmahagow Development Trust
ii. the lease will be for a period of 1 year  
iii. the date of entry to be agreed
iv. the rental shall be £1 per annum, if asked
v. the lease to be fully repairing and insuring subject to the Tenant obtaining a
satisfactory condition survey
52

Page 53

vi. the tenants will be required to obtain and exhibit as required, public liability
insurance to the value of £5 million for any one claim
vii. the Council will insure the property and recover the costs from the tenants
viii. the property will be used as a community hall, soft play area and offices
ix. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
x. assignation and subletting (excluding hourly lets ) will not be allowed without the
Council's express consent 
xi. each party to be responsible for their own legal costs however, the tenants will
require to pay any registration fees and Land and Buildings Transaction Tax
(LBTT) if required 
5.2. At the expiry of the lease, the Council and Lesmahagow Development Trust will
consider renewal of the lease subject to being satisfied as to the operation of the
subjects by the Trust. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. The lease will result in a saving in void property costs including empty rates, insurance
and utility standing charges and repairs and maintenance. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. The income from the lease to Bank of Scotland at 9 Abbeygreen will be retained by
the Council.  The Council will manage the retained common repairs liabilities for areas
shared with the Bank. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
26 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Caring, connected, sustainable communities 
Previous References
♦ None  
53

Page 54

List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: joanne.forbes@southlanarkshire.gov.uk  
54

Page 55

55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Update on the Property Asset Management
Plan 2021 to 2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update Committee on the outcomes of the Property Asset Management Plan
2021 to 2025 annual update, including the Local Government Benchmarking
Framework (LGBF) Indicator outcomes for Property Condition and Suitability
 update Committee on the outcomes of the review into the extended model for
Corporate Asset Management Plans
 advise Committee of the development of a new Energy Demand Reduction Plan
to be incorporated into the Property Asset Management Plan 2021 to 2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations:- 
(1) that the 2022 update to the Property Asset Management Plan 2021 to 2025,
including the updated Local Government Benchmarking Framework Indicators
for Property Condition and Suitability, be noted;
(2) that the outcomes of the review into the extended model for Corporate Asset
Management Plans, be noted; and
(3) that proposals to develop a new Energy Demand Reduction Plan within the
Property Asset Management Plan 2021 to 2025, be noted. 
3. Background
3.1. On 22 September 2010, the Executive Committee approved the implementation of
an extended model for Corporate Asset Management to be implemented from 2011. 
This included developing Asset Management Plans (AMPs) across a number of
service areas, in line with the Chartered Institute of Public Finance and Accountancy
(CiPFA) guidance at that time. 
3.2. The service areas from across the Council included within this approach were
Property, Housing, Roads Infrastructure, Fleet and ICT with each being approved by
and progress reported to the relevant Resource Committee.  A Corporate AMP was
also developed and reported through the Council’s Corporate Management Team
before publication.  This summarises the content of the service AMPs, ensuring
alignment with the Council’s corporate objectives, in relation to appropriate asset
management. 
3.3. The current Property AMP 2021 to 2025 was approved at the Housing and Technical
Resources Committee on 8 December 2021 and in line with CiPFA guidance, is
subject to an annual update.  
7
57

Page 58

This is the twelfth version of the current format, aiming to support the Council’s
recognition of the importance of the good management of its assets to enable the
delivery of high quality services.  This includes managing a property portfolio which
meets the Council’s needs in terms of scale, condition, location and suitability.  In
addition, the portfolio should adhere to Corporate Standards, being in good
condition, well maintained, well used and energy and cost efficient. 
4. 2022 Update to the Property AMP 2021 to 2025
4.1. The current Property AMP is divided into 2 sections: direct operational property and
the lease portfolio, for which a separate business plan has been prepared. 
4.2. Operational Property
4.2.1. The operational property portfolio comprises 355 establishments from which a
Council service is delivered. 
4.2.2. Within the Property AMP, operational properties are assessed on Core Facts for
Condition and Suitability, the outcome of which is detailed in Appendix 1. 
4.2.3. The 2022 update has been prepared in accordance with the latest guidance from the
Scottish Government which aims to:- 
 strengthen the risk-based approach to condition surveys through a raised
awareness of the importance of effective risk management as an integral part
of the facilities management regime
 ensure greater uniformity in the scope and methodology applied to each
property to minimise variations in assessment methods and criteria
 further improve the consistency and robustness of the reporting of the
Suitability Core Fact and therefore increase confidence in the comparability of
the ratings within and among local authorities across Scotland 
4.2.4. The outcome of the assessment demonstrates continued progress towards
establishing a core estate through property rationalisation and investment.  Despite
the current financial climate and reduced funding to Scottish Local Authorities, the
figures show that, through programmes of Prioritised Capital Investment and
Planned Preventative Maintenance, performance to date remains positive. 
The centralisation of property budgets and services enables the prioritisation of
investment and ensures that it is directed in line with corporate priorities.  It is
recognised, however, that the restrictions in budgets, building and energy costs and
climate change to targets mean that sustaining the current property estate is
becoming more challenging.  Property Services continues to engage with all Council
Resources and public sector partners during 2022/2023 and 2023/2024, regarding
service requirements. 
4.3. Estates Portfolio
4.3.1. On behalf of the Council, Property Services also manages a tenanted, non-
residential, lease portfolio, known as the ‘Estates Portfolio’, which consists of 711
properties, with a gross rental income of £4,972,222 as at 31 March 2022.  The role
of this portfolio, which comprises a wide range of property interests from ground
rents for major retail developments through to business centres, is to support the
economic and social objectives of the Council as well as meeting corporate financial
targets.  Key Facts for the Estates Portfolio are included in Appendix 1. 
58

Page 59

4.3.2. During 2023/2024 the Estates Portfolio objectives will continue to be reviewed, in
conjunction with services from across Housing and Technical Resources and
Community and Enterprise Resources, to ensure they are aligned and contribute to
the Council’s objectives.  Opportunities to further invest in this portfolio will also be
explored.  Financial performance and risks will continue to be monitored through the
Estates Business Plan. 
4.4. Community Asset Transfer
Under the terms of the Community Empowerment (Scotland) Act 2015, Community
Asset Transfer requests can be made in respect of any type of property asset.
Additional support in terms of grants and advice has seen a steady increase in the
levels of enquiry regarding asset transfer and in the number of successful
applications that have been processed by the Council.  During 2021/2022, 1 transfer
was approved and during 2022/2023, 7 were approved. 
5. Performance Indicators
5.1. The Local Government Benchmarking Framework (LGBF) Indicators for Asset
Management relate to the property Core Facts for Condition and Suitability for direct
operational property, excluding Housing. 
5.2. Benchmarking for 2022 has given the following return for the LGBF Indicators:- 
 condition is assessed as the percentage of floor space of operational buildings
which are in a satisfactory condition (categories A & B in Core Facts).  This
indicates 88.1% of properties are in a satisfactory condition, sustaining the
performance of 87.8% from the previous year
 suitability is assessed as the percentage of operational buildings which are
considered to be suitable for service delivery (matching categories A & B in
Core Facts).  This indicates 94.7% of properties are suitable for service
delivery.  This represents a decrease in suitability performance, reflecting the
changing nature of the Council’s service requirements 
5.3. The performance figures for Condition noted above differ from the Council’s internal
performance assessment, as set out in Appendix 1, as the LGBF measures are
calculated on a floor area basis. 
6. Review of Extended Corporate Asset Management Model
6.1. With the overarching aim of reducing duplication across new and emerging reporting
requirements for the Council, Housing and Technical Resources has reviewed the
updated CiPFA guidance relating to asset management.   
6.2. The review identified that existing reporting arrangements for Property, Roads
Infrastructure, Fleet and ICT remain appropriate, with relevant services continuing to
report to their own Committees on an annual basis. 
6.3. In relation to the Housing AMP, the review highlighted that significant duplication
was occurring for the detail contained within the Housing AMP and other statutory or
non-statutory reporting mechanisms.  The review also included analysis of asset
management processes completed within other local authorities and identified South
Lanarkshire as an outlier in terms of the publishing of a Housing AMP.   
6.4. As such a specific Housing AMP will no longer be prepared and submitted to
Housing and Technical Resources Committee for noting, with the detail it contained
available through a range of other reporting mechanisms.  This includes:- 
59

Page 60

 information on compliance with the Scottish Housing Quality Standard (SHQS)
and both phases of the Energy Efficiency Standard for Social Housing
(EESSH) is reported through the annual update of the statutory Local Housing
Strategy 2022 to 2027, reported to Executive Committee and the Scottish
Government, the annual update to the Resource Plan, reported to Housing and
Technical Resources Committee and through the Scottish Housing Charter
annual return, compiled by the Scottish Housing Regulator
 information on the Council’s domestic stock profile reported to the Scottish
Housing Regulator and published online
 information on repairs and adaptations and the associated service performance
reported through the Resource Plan, reported to both Housing and Technical
Resources Committee and through the annual Scottish Housing Charter return
 information relating to progress and projects supporting local or national energy
efficiency or decarbonisation ambitions and targets reported through the annual
update of the Local Housing Strategy, reported to Executive Committee
 information relating to the acquisition or disposal of housing stock reported to
Housing and Technical Resources Committee, including through annual update
to the Strategic Housing Investment Programme and standalone reports 
6.5. Housing and Technical Resources will continue to monitor CiPFA and other
appropriate guidance in relation to asset management with any significant changes
to the extended model established in 2011 submitted to Executive Committee for
approval and relevant Resource Committee’s for noting.   
7. Development of an Energy Demand Reduction Plan
7.1. At the full Council meeting on 7 December 2022, a motion was passed titled ‘Cut
Fuel Bills, Cut Carbon Emissions, Kick Start the Green Economy’.  This included a
range of actions for the Council to progress including a requirement to consider how
it could further reduce energy usage across its property portfolio.   
7.2. In response to this, Housing and Technical Resources is currently working with
relevant services from across the Council to prepare an Energy Demand Reduction
Plan.  Initial actions within this could include recommencement of ‘energy
champions’ across the workforce and a phased building assessment to identify
further saving opportunities. 
7.3. A full report detailing the Council’s response to the motion will be submitted to the
Sustainable Development and Climate Change Committee on 14 June 2023,
including the proposed approach of developing an Energy Demand Reduction Plan
to align with the Property AMP and annual update.   
8. Next Steps
8.1. A 2022/2023 update to the Property AMP will be presented to Housing and Technical
Resources Committee in August 2023 for noting. 
8.2. Housing and Technical Resources will continue to monitor CiPFA and other
appropriate guidance in relation to asset management. 
8.3. As detailed at 7.3, reference to the Property AMP will be included within a response
to the full Council motion of 7 December 2023, highlighting development of an
Energy Demand Reduction Plan. 
9. Employee Implications
9.1. There are no employee implications associated with this report. 
60

Page 61

10. Financial Implications
10.1. The details of the AMPs will influence future investment decisions and capital bids,
however there are no current direct financial implications from the production of the
Property AMP. 
11. Climate Change, Sustainability and Environmental Implications
11.1. The AMPs will influence future proposals/options to utilise the Council’s portfolio of
assets in a way which improves energy efficiency whilst reducing carbon outputs. 
11.2. The national Heat in Buildings Strategy sets out ambitions for transforming
Scotland’s buildings so they are warmer, greener and more efficient.  The Strategy,
covering both energy efficiency and decarbonisation, seeks to ensure a just
transition to zero emissions by 2045, whilst maximising economic opportunities.  The
focus of any future investment or improvement works must therefore aim to reduce
carbon emissions. 
11.3. The scale of investment required to retrofit all Council assets to meet the
environmental targets cannot be met from existing budgets.  Consideration therefore
needs to be given to opportunities to secure external funding and prioritisation of
investment projects to achieve climate change or sustainability ambitions. 
12. Other Implications
12.1. The AMPs assist the Council in managing its assets, efficiently and effectively to
deliver best value whilst also helping to manage risk across the asset base. 
13. Equality Impact Assessment and Consultation Arrangements
13.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
13.2. The statutory Consultation Authorities have confirmed that the AMPs are exempt
from Strategic Environmental Assessment as their implementation will have minimal
effect in relation to the environment. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
11 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
 Fair, open and sustainable
 Caring, connected, sustainable communities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve   
Previous References
 Housing and Technical Resources Committee 8 December 2021 
List of Background Papers
 2022 Lease Portfolio Asset Management Plan 
61

Page 62

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk
62

Page 63

Appendix 1 - Property AMP Key Facts 
Table 1: Condition Core Fact 
2022 2021
Condition Category  Number of
properties
by category
Percentage 
by 
category
Number of
properties
by category
Percentage 
by 
category
A Good - Performing well and
operating effectively.
160 45.0% 165 46.1%
B Satisfactory - Performing
adequately but showing minor
deterioration.
122 34.4% 115 32.1%
C Poor - Showing major
defects and/or not operating
adequately
68 19.2% 72   20.1%
D Bad - Economic life expired
and/or risk of failure
5 1.4% 6   1.7%
Totals 355 100% 358 100% 
Table 2: Suitability Core Fact 
2022 2021
Suitability Category  Number of
properties
by category
Percentage 
by 
category
Number of
properties
by category
Percentage 
by 
category
A Good - Performing well and
operating effectively.
300 54.5% 308 55.3%
B Satisfactory - Performing
well but with minor problems.
143 26.0% 136 24.4%
C Poor - Showing major
problems and/or not operating
optimally
78 14.2% 93   16.7%
D Bad - Does not support the
delivery of services 
29 5.3% 20   3.6%
Totals 550 100% 557 100% 
63

Page 64

Notes to Tables: 
1. 355 is the number of operational establishments which may comprise more
than one building or accommodate multiple Resources and uses. Condition is
assessed on an establishment basis. 
2. 550 is the number of service interests within the operational establishments. 
3. Condition is assessed as an overall rating for the property based on an
elemental assessment carried out by qualified surveyors. 
4. Suitability is an assessment by Resources of how well the property supports 
current service delivery in terms of design and location. 
Table 3: Estates Portfolio Headline Financial Figures 
2021/22 2020/21
Number of Properties 711 708
Gross Income Received £5,782,312 £4,778,321
Gross Rental Income £4,972,222 £4,284,071 
64

Page 65

Appendix 2 
Property Asset Management Plan 2021-2025 
2022 Update 
65

Page 66

PART 1: PERFORMANCE UPDATE 
Table 1: Condition Core Fact 
2022 2021  
Condition Category  Number of
properties by
category
Percentage 
by 
category
Number of
properties by
category
Percentage 
by 
category
Direction of
Travel
Comment
A Good - Performing well and
operating effectively.
160 45.0% 165 46.1%  The table demonstrates that 79.4% of
properties are in satisfactory
condition, an increase from 78.2% in
2021. Despite the current financial
climate and reduced funding to
Scottish Local Authorities, the figures
show that, through programmes of
Prioritised Capital Investment and
Planned Preventative Maintenance,
performance remains positive for the
majority of categories of property. 
B Satisfactory - Performing
adequately but showing minor
deterioration.
122 34.4% 115 32.1% 
C Poor - Showing major
defects and/or not operating
adequately
68 19.2% 72   20.1% 
D Bad - Economic life expired
and/or risk of failure
5 1.4% 6   1.7% 
Totals 355 100% 358 100%  
66

Page 67

Table 2: Suitability Core Fact 
2022 2021  
Suitability Category  Number of
properties by
category
Percentage 
by 
category
Number of
properties by
category
Percentage 
by 
category
Direction of
Travel
Comment
A Good - Performing well and
operating effectively.
300 54.5% 308 55.3%  The table demonstrates that 94.7% of
properties support delivery of services
in terms of suitability, a slight decrease
from 96.4% in 2021. Continued
implementation of the Council’s asset
management strategy and plans has
resulted in a clear focus in optimising
Council buildings to ensure they are
suitable.
The reduction in numbers attributable
to assets now disposed of
demonstrates continued progress
towards the Council’s strategic
objective of establishing a core estate
through property rationalisation.
B Satisfactory - Performing
well but with minor problems.
143 26.0% 136 24.4% 
C Poor - Showing major
problems and/or not
operating optimally
78 14.2% 93 16.7% 
D Bad - Does not support the
delivery of services 
29 5.3% 20  3.6% 
Totals 550 100% 557 100%  
67

Page 68

Table 3: Local Government Benchmarking Framework Indicators: Condition 
Measure 2022 2021 Direction of
Travel
Comment
Gross Internal Floor Area of
Operational Buildings (m2)
691,733 694,219  The table indicates 88.1% of properties are in a satisfactory condition,
sustaining the performance of 87.8% from the previous year. The
restrictions placed on capital investment during the current capital
programme will provide challenges to sustained performance.  However,
measures are in place through our Asset Management Strategy to
mitigate any risks and sustain service delivery. 
Proportion of GIA that is in
Satisfactory Condition (m2)
609,537 609,391 
Percentage of Internal Floor
Area of Operational Buildings in
Satisfactory Condition
88.1% 87.8%  
Table 4: Local Government Benchmarking Framework Indicators: Suitability 
Measure 2022 2021 Direction of
Travel
Comment
Total Number of Operational
Buildings
550 557  The table indicates 94.7% of properties support delivery of services in
terms of suitability, a slight reduction from 96.4% in 2021 and reflects the
changing nature of the Council’s service requirements. 
Number of Operational Buildings
that are Suitable for Their
Current Use
521 537 
Percentage of Operational
Buildings that are Suitable for
Their Current Use
94.7% 96.4%  
68

Page 69

Table 5: Property Costs 
Measure 2022 2021 Direction of
Travel
Comment
Gross Property Costs of the
Operational Estate as a
percentage of the Council’s
Gross Revenue Budget.
6.52% 6.48%  Renewable technologies and staff behavioural programmes lower the
council’s dependency on grid electricity and gas and reduce both carbon
emissions and energy costs.  The reduction in costs demonstrates the
effectiveness of these measures. 
Total cost of Repairs and
Maintenance
£7.089m £7.432m 
Energy/Carbon Costs £12.052m £12.585m  
Table 6: Estates Management 
Measure 2022 2021 Direction of
Travel
Comment
Percentage of lease portfolio
properties that are void
10.9% 8.6%  Voids were an issue in business centres and the Hamilton/Larkhall
industrial units, however these have staged a recovery since the
2021/22 year-end.
The increased debt is primarily due to the post covid collapse in
shopping centre ground rents and the increasing company failures
especially related to retail sector and the end of covid support.
Continued focus on void and debt reduction remains the priority.
Percentage debt of invoiced
income
10.9% 7.7% 
Total Value of Capital Receipts £2.082m £126.9k  
69

Page 70

Table 7: Energy Management 
2022 2021
EPC Rating Number Number
A+ 7 7
A 29 28
B+ 24 24
B 42 42
C+ 25 25
C 12 12
D+ 1 1
D 13 13
E+ 7 7
E 10 11
F+ 2 2
F 20 20
G 67 67
No Rating 96 99
Total 355 358 
70

Page 71

Table 8: Community Asset Transfer 
Measure 2022 2021 Direction of
Travel
Comment
Total number of applications
received
8  3  Community Asset Transfer is reported annually to the Scottish
Government at the end of June. 
There has been a steady increase in enquiries and successful
asset transfer requests.
Number of successful
applications
7 1 
Number of applications refused 1 1  
Withdrawn prior to Decision
Notice
0 1 
Number of Appeals to
Council/Scottish Government
1 0  
71

Page 72

PART 2: ACTION PLAN 
A, Action Plan – Strategic 
Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
A1 Development of a 5 year
Office Strategy.
Plan and manage property as a
corporate resource to deliver the
Council’s outcomes.
Develop proposals to
further reduce the office
portfolio.
Ongoing.
A2 Complete a review on impact
of agile working on office
requirements.
Plan and manage property as a
corporate resource to deliver the
Council’s outcomes.
Develop proposals to
support a “blended”
approach to agile working.
Discussions underway
with Services
regarding future office
requirements.
A3 Implement the Council’s
sustainable development and
carbon management plans
and strategies, ensuring the
Council’s properties are fully
accessible and contribute to
short, medium and long term
carbon reduction targets. 
Ensure our current property and
future estate is as sustainable as
possible in design, construction,
operation and final disposal.
Two actions which will be
undertaken this year and
which contribute to the
Council’s sustainability
goals are the accessibility
review and strategic
energy review.
Ongoing.
A4 Continue to implement the
Council’s 10 year Capital
Investment Strategy. 
Plan and manage property as a
corporate resource to deliver the
Council’s outcomes. 
Investment in our leisure
centres, community halls,
roads – including park and
ride facilities, cemeteries,
pitches, play parks, country
parks and allotments and
libraries.
New priorities
identified and Capital
Programme updated.
A5 Asset Review and Challenge
– Rationalisation of the
Provide the right property, fit for
purpose, in the right place, to
Identification of sites for
new build social housing, 
72

Page 73

Council’s asset portfolio.  meet current service needs and to
plan for the future.
co-location and disposal.
A6 Review of homeless
accommodation.
Provide the right property, fit for
purpose, in the right place, to
meet current service needs and to
plan for the future.
Identification of sites to
support the newly
emerging homelessness
accommodation model.
Feasibility studies
being progressed. 
A7 Partnership working Promote joint working where it will
provide benefit for service delivery
and in securing efficiencies.
Explore options for co-
location across South
Lanarkshire with Police
Scotland
Ongoing. 
A8 Produce an energy demand
reduction plan for council
buildings.
Ensure our current property and
future estate is as sustainable as
possible in design, construction,
operation and final disposal.
Consider actions such as
consulting on a set point of
18 degrees or a ‘one
degree less’ approach
where it is safe to do so,
reducing heating times or
boiler temperatures and
engaging and supporting
Members and staff in other
immediate, no/low cost
ways to reduce bills.
New initiative. 
73

Page 74

B. Action Plan – Operational/Service Improvement 
Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
B1 Identify a future programme
of disposals in line with the
Capital Receipts targets.
Manage and maintain
property effectively and
efficiently, together with
optimising financial return
and commercial
opportunities from the
rationalisation and disposal
of property.
Agreed Capital Receipt
programme with
Finance.
A review of future disposal sites
ongoing with proposed future
programme to be agreed.
B2 Develop an Integrated
Housing and Property
Management System.
Plan and manage property
as a corporate resource to
deliver the Council’s
outcomes.
Move towards a single
system and removal of
outdated separate
systems.
Property Services (Estates) progressing
interim Property Management system to
replace Yardi (at similar cost) pending
development of single system in future
years .
B3 Lifecycle Replacement –
Schools.  Manage and maintain
property effectively and
efficiently, together with
optimising financial return
and commercial
opportunities from the
rationalisation and disposal
of property.
Develop a programme
of replacement for
major elements of
infrastructure.
Draft 5 year programme developed.
Year 1 implemented.
B4 Complete relocation from
Caird Centre and complete
disposal transaction.
Manage and maintain
property effectively and
efficiently, together with
optimising financial return
and commercial
Settlement of disposal
by January 2022.
Complete.
74

Page 75

opportunities from the
rationalisation and disposal
of property.
B5 Develop a demolition
programme and identify
funding options. 
Manage and maintain
property effectively and
efficiently, together with
optimising financial return
and commercial
opportunities from the
rationalisation and disposal
of property.
Removal of
outstanding liabilities.
Demolitions to date include Crawford
and Leadhills Public Toilets.
B6 Completion of the 1140
Hours Early Learning and
Childcare Programme
Provide the right property, fit
for purpose, in the right
place, to meet current
service needs and to plan for
the future.
Completion by
December 2022
All projects completed by August 2021
with the exception of the new nursery in
Bothwell/Uddingston which is targeted
for completion late 2022.
B7 Review the approach to
reporting on Common Good
assets.
Plan and manage property
as a corporate resource to
deliver the Council’s
outcomes. 
Implement agreed
reporting model
Ongoing.
B8 Consult and engage with
community groups who have
indicated an active interest in
community asset transfer.
Manage and maintain
property effectively and
efficiently, together with
optimising financial return
and commercial
opportunities from the
rationalisation and disposal
of property.
Support a minimum of
2 community
organisations to
achieve successful
Community Asset
Transfer.
Achieved. Community Asset Transfer
Fund used to support community
organisations develop proposals.
Council processes updated.
B9 Review of Community and
Enterprise Depots, civic
Provide the right property, fit
for purpose, in the right
Service requirement
brief and identification
Ongoing.
75

Page 76

amenity sites and salt barn
facilities to identify best
investment options.
place, to meet current
service needs and to plan for
the future.
of funding options.
Potential Capital Bid
B10 Review of day care centres. Provide the right property, fit
for purpose, in the right
place, to meet current
service needs and to plan for
the future.
Implement actions
identified through
review being
undertaken by Social
Work.
Will reach a conclusion by end of the
calendar year.
B11 Review of proposed care
home replacement
programme including
investment in those being
retained.
Provide the right property, fit
for purpose, in the right
place, to meet current
service needs and to plan for
the future.
Implement actions
identified through
review being
undertaken by Social
Work.
Phase 1 – Decommissioning of 3No
care homes and opening of new facility
will conclude this year.
Phase 2 – Remodelling of
Clydesdale/Larkhall area still to be
determined.
Phase 3 – Reconfiguration of David
Walker Gardens, Meldrum Gardens and
McKillop Gardens is a future
development.
B12 Review impact of new IPC
measures on the care home
environment and plan for
necessary upgrades on a
cyclical basis. 
Manage and maintain
property effectively and
efficiently, together with
optimising financial return
and commercial
opportunities from the
rationalisation and disposal
of property.
Implement actions
identified through
review.
Social Work have identified all
investment that fall under IPC.
B13 Review investment required
in Universal Connections
facilities to maximise their
potential in delivering the
Councils Community
Provide the right property, fit
for purpose, in the right
place, to meet current
service needs and to plan for
the future.
Service requirement
brief and identification
of funding options.
Ongoing.
76

Page 77

Learning and Development
Initiatives.
B14 Plan and Manage Early
years, Primary School and
Secondary School
expansions to meet the
education needs of the new
SLC Community Growth
Areas and other large scale
housing developments.
Provide the right property, fit
for purpose, in the right
place, to meet current
service needs and to plan for
the future.
Completion by March
2026
Planned projects include new primary
school and nursery at EK CGA
(Jackton), new nursery at Larkhall,
expansions and extensions at a number
of Early Learning and Child Care
Centre, Primary and Secondary
Schools.
B15 Undertake adaptations and
extensions to Educational
Property to meet planned
growth and changing
requirements of pupils.
Provide the right property, fit
for purpose, in the right
place, to meet current
service needs and to plan for
the future.
Programme of capital
works to be developed.
Ongoing - funding being sought through
LEIP. 
77

Page 78

78

Page 79

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Report: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Revision of Costs Associated with the Acquisition of
Houses at Brackenhill Farm, Hamilton - Section 75
Planning Reference PL/21/2093 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise on action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Housing and Technical
Resources), in consultation with the Chair and an ex officio member, to conclude
the contract with Taylor Wimpey
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-  
(1) that the following action taken, in terms of Standing Order No 37(c ), by the
Executive Director (Housing and Technical Resources), in consultation with
the Chair and an ex officio member, be noted; and 
(2) that the authority granted to the Executive Director (Housing and Technical
Resources), in conjunction with the Head of Administration and Legal
Services, to conclude matters and to enter into the necessary legal
agreements on terms which are in the best interests of the Council, be noted.  
3. Background
3.1. The site at Brackenhill Farm in Hamilton is identified within the Council’s Strategic
Housing Investment Plan as a priority site in delivering the Council’s target of 1,300
additional homes by 2027.  This site forms 1 part of the Hamilton Community Growth
Area (CGA), which is located on the southwest edge of Hamilton and is designated
for residential development to meet Glasgow and Clyde Valley Structure Plan
requirements for the release of 2,000 houses. 
3.2.  The application for the development at Brackenhill Farm, Hamilton was approved by
the Planning Committee on 11 October 2022.  The approval was granted for the
erection of 53 dwellings to Taylor Wimpey, this has now been consented and
includes an obligation for an on-site provision of up to 50 affordable homes. 
3.3.  The Council entered into discussions with Taylor Wimpey to provide its planning
obligation for new affordable homes via a turnkey arrangement with the Council only
paying the full amount due on completion of each property.  The proposal provided
by Taylor Wimpey has been assessed by the Council’s Technical and Commercial
Team as representing value for money. 
8
79

Page 80

4. Proposal
4.1. In the report approved at Housing and Technical Resources Committee on 14
December 2022 (agenda item 9), the Executive Director (Housing and Technical
Resources) was authorised to acquire 50 completed affordable homes from Taylor
Wimpey for a total price not in excess of £8.545 million (which includes the cost of
land), to fulfil the planning obligations associated with the residential development of
the site. 
4.2. Following approval at Committee on 14 December 2022, Taylor Wimpey advised the
Council that it had not included costs for full Electrical Vehicle Charging Points
(EVCPs) to be installed for each dwelling being purchased by the Council on the site,
instead opting to provide costs relating only to the ducting and infrastructure,
allowing the EVCPs to be installed at a later date.  Installation of full EVCPs for each
unit on the site is, however, required, as set through Supplementary Planning
Guidance to the South Lanarkshire Local Development Plan 2. 
4.3. As such, an additional £166,000 will now be required to complete the transaction and
authority is requested by the Executive Director (Housing and Technical Resources)
to acquire 50 completed affordable homes at the revised cost of £8,711,000. 
5. Employee Implications
5.1. There are no employee implications associated with this report. 
6. Financial Implications
6.1. In line with the Home+ Programme, including the new target established at Executive
Committee on 30 November 2022, acquisition of the plots will be funded through a
combination of Scottish Government grant funding, Housing Revenue Account
capital investment and Council borrowing. 
6.2.  Should expected levels of Scottish Government grant be received and average costs
for borrowing and capital contributions continue, it is expected the new build aspect
of the Home+ programme and in particular the acquisitions of these plots, would
have a neutral impact to the Housing Revenue Account Business Plan over a 40-
year period.  This means that over the 40-year period, the net cost of the additional
borrowing and all other costs can be met from the additional rental income received. 
6.3.  Whilst there is a neutral impact on the Housing Revenue Account Business Plan
over a 40-year period, there are initial construction and purchase costs at the start of
the programme which impact on the cashflow in the early years of the programme. 
The estimated costs have been included in the Business Plan in respect of the rent
uplift projections for 2023/2024. 
6.4. Despite the increase in costs detailed at 4.3, as a result of the requirements of
installing full EVCPs, there will be no further financial implications associated with
the acquisition.  The revised costs remain within the financial assumptions made and
as such will continue have a neutral impact on the Housing Revenue Account
Business Plan. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising
from this proposal. 
8. Other Implications
8.1. There are no other implications associated with this report.   
80

Page 81

8.2. There are no significant risks or sustainability issues associated with this report. 
8.3. Normal Council protocols to ensure that there are no conflicts of interest apply to this
scheme. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy and therefore, no
separate impact assessment is required. 
9.2. No formal consultation process was required in terms of the recommendation
contained in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
21 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities  
 Focused on people and their needs 
Previous References 
 Housing and Technical Resources Committee, 14 December 2022 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or require further information, please
contact:
Joanne Forbes, Head of Property Services
Housing and Technical Resources
joanne.forbes@southlanakshire.gov.uk 
81

Page 82

82

Page 83

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Delegated Authority Report – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise on transactions processed by delegated authority by Property Services
during Quarter 4 of 2022/2023 and to provide a year-end summary
[1purpose]
2. Recommendation(s)
2.1. The Housing and Technical Resources Committee is asked to approve the following
recommendation(s):- 
(1) that the transactions processed by delegated authority by Property Services
during Quarter 4 of 2022/2023, together with the year-end summary of all such
transactions, be noted. 
3. Background
3.1. The Executive Director (Housing and Technical Resources) has delegated authority
to deal with various transactions, including:- 
 leases of a value up to £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
3.2. Delegated authority reports are prepared by case officers and submitted to the Head
of Property Services for approval, once provisional agreement has been reached
with the third party.  A weekly list of approved reports is published on the Council’s
intranet under “Estates Property Transactions”. 
3.3. The delegated reports provide authority for officers to progress transactions and
where appropriate, to instruct Legal Services.  The receipt of any monies arising
from the transactions occurs at a date in the future, once missives have been
concluded and any suspensive conditions met.  It should be noted that some
transactions may never settle. 
4.  Summary Quarter 4, 2022/2023
4.1. The summary of transactions progressed under delegated authority during Quarter 4
of 2022/2023 is shown in Appendix 1, column 2, however, can be summarised as
follows:-  
9
83

Page 84

Total number of transactions 38 
Total value of lease transactions £68,669 per annum 
Total value of capital transactions £1,584,075 
Total number of miscellaneous transactions Nil 
5. Annual Summary 2022/2023
5.1. The summary of all transactions progressed under delegated authority during the
financial year 2022/2023 is shown on Appendix 1, column 3 and can be summarised
as follows:- 
Total number of transactions 216 
Total value of lease transactions £597,477 per annum 
Total value of capital transactions £6,229,202 
Total value of miscellaneous transactions £55,502 
5.2.  The overall profile of the volume and value of transactions during 2022/2023
generally compares with previous years.   
6. Employee Implications
6.1. There are no employee implications. 
7. Financial Implications
7.1. The rental income to the Council is increased as a result of the new lettings and
lease renewals.   
7.2. Disposals generate additional capital monies for the Council’s Capital Programme. 
7.3. Acquisitions are carried out in accordance with project plans and approved capital
budgets, to enable investment programmes to proceed. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and environment
contained within this report. 
9. Other Implications
9.1. There is a low risk that the rental and capital receipts identified within these
delegated authority reports are not achieved if, for reasons outwith the Council’s
control, the tenant/purchaser chooses not to proceed with the transactions. 
However, Property Services has in place procedures and consultations intended to
minimise this risk. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Consultation takes place with the occupying Resource, Planning, Roads and Legal
Services, on a transaction by transaction basis as and when required. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
6 April 2023
84

Page 85

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 15 March 2023
 Housing and Technical Resources Committee, 14 December 2022 
List of Background Papers
 Plans and drawings of the property involved in these transactions can be obtained from
the Assets and Estates Team, Property Services
 Weekly List of Delegated Authority Transactions can be obtained on the Council’s
intranet 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
85

Page 86

Appendix 1 
Delegated Authority Transactions 
Transaction Type  Quarter 4
2022/2023
Annual Summary 
No Value No Value     
Lease Renewal 0 £0 19  £141,950     
New Lease 
Landlords Consent
5
7
£38,932 
£1
39 
19
£339,639 
£1     
Assignation 3 £0 8 £0     
Rent Review 1 £29,736 8 £115,887     
Total Revenue  16  £68,669  93  £597,477     
Disposal 0 £0 15 £172,180     
Compensation 2 £10,275 16 £61,655     
Wayleave/Servitude 2    £800 10 £3,527     
Acquisition 
Title Waiver
17 
0
£1,573,000 
£0
71 
0
£5,991,840 
£0     
Total Capital  21  £1,584,075  112  £6,229,202     
Miscellaneous 1 £0 11 £55,502 
86

Page 87

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 31 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Notification of Contracts Awarded - 28 October 2022 to
31 March 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee of contracts awarded by Housing and Technical
Resources for the supply of Goods, Services and Works, following formal
tendering in excess of £50,000 during the period 28 October 2022 to 31 March
2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r]
(1) that the details of the contracts awarded by Consultancy Services in Appendix
A, be noted; and
(2) that the details of the contracts awarded by Procurement Team in Appendix
B, be noted.
[1recs]
3. Background
3.1. It is a requirement of Clause 21.8 of the Standing Orders on contracts that details of
the acceptance of all tenders above £50,000, be reported retrospectively to the
relevant Committee for noting other than those under Clause 21.3 where the award
is not the lowest in a price only tender or costs exceed the approved financial
provision.  In these instances a report is submitted to the appropriate Committee and
subsequent authority to award is granted by that Committee. 
4. Contracts Awarded
4.1. A full list of the contracts is provided in the appendices to this report. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. Appropriate budgetary provision is available for each of the contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications in terms of
the information contained within this report. 
8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report.
10
87

Page 88

9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is no requirement to undertake any consultation in relation to the content of
this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
11 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Housing and Technical Resources Committee, 14 December 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Derek Craig, Property Manager (Consultancy Services)
Ext:  845 3517 (Tel:  01698 453517)
E-mail:  Derek.Craig@southlanarkshire.gov.uk 
88

Page 89

Appendix A 
Contracts Awarded (Consultancy Services) 28 October 2022 – 31 March 2023 
Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Housing HOD011923 &
HOD011924
Patrickholme Avenue,
Stonehouse & Rorison Place,
Ashgill
Landscapes and Contracts
Ltd Parking Provision £88,974.83 12/12/2022
Housing HOD011875 Headhouse Court Sheltered
Housing Complex SLC Building Services Internal Area Upgrade £182,135.52 28/12/2022
Education EDD011890 Forth PS Alterations SLC Building Services Alterations £134,443.25 18/01/2023
Housing HOD011366 Dunlop, Lister & Fraser River
Towers, East Kilbride
Magnus Electrical Services
Ltd Emergency Lighting £344,280.87 24/01/2023
Education
EDD012048.002,
EDD012048.003,
EDD012048.005,
EDD012048.007,
EDD012048.010
Universal School Meals
Kitchen Expansions
James Scott & Sons (Kitchen
Equipment) Ltd
Kitchen Equipment at
Chapelton, St John the Baptist,
Woodside, Kirkfieldbank and
Mossneuk Primary Schools
£279,595.00 31/01/2023
Education EDD011853 Crawforddyke PS SLC Building Services Adaptations to Nursery,
Classroom & GP Area £148,872.80 06/02/2023
Education EDD011944 Carluke Primary School SLC Building Services ASN Adaptations £157,683.74 17/02/2023
Housing HOD011877 McLean Gardens Sheltered
Housing Complex SLC Building Services Internal Area Upgrade £174,708.96 22/02/2023
89

Page 90

Client Project Ref Title Winning Contractor Brief Description of Work Contract Sum
Letter of
Acceptance
Issued
Enterprise ERD011063.001 Lanark Park & Ride Burnfield demolition Ltd Demolition Ladyacre Road,
Lanark £63,351.75 27/02/2023
Education EDD012048.003 Kirkfieldbank PS SLC Building Services Kitchen Expansion £117,533.44 09/03/2023
Housing HOD011852.002 Kirkton House George Beattie & Sons Ltd Demolition £86,604.00 10/03/2023
Housing HOD011852.001 McWhirter House MacWilliams Demolition Ltd Demolition £96,967.50 10/03/2023
Housing HOD011879 Davaar Sheltered Housing
Complex SLC Building Services Internal Area Upgrade £167,111.25 21/03/2023
Education EDD011841 First Steps Nursery Extension SLC Building Services Advanced Works Package £223,200.68 23/03/2023
90

Page 91

Appendix B 
Contracts Awarded (Procurement Team) 28 October 2022 – 31 March 2023 
Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/HTR/22/267 Supply and Delivery of
Wallboards FIBO UK LTD Supply and Delivery of
Wallboards £310,000 14/11/2022
SLC/PS/HTR/22/034 Servicing & Maintenance of Fire
Alarms and Intruder Alarms
King Communications &
Security Ltd
Servicing & Maintenance of Fire
Alarms and Intruder Alarms £87,594 09/12/2022
SLC/PS/HTR/22/270 Interim Ukrainian Displaced
Persons Accommodation Service
The Salvation Army
Trustee Company
Interim Ukrainian Displaced
Persons Accommodation Service £262,541 19/12/2022
SLC/PS/HTR/21/440
Maintenance of Biomass Boilers
& Supply & Delivery of Biomass
Pellets
Alternative Heat Ltd
Maintenance of Biomass Boilers
& Supply & Delivery of Biomass
Pellets
£3,562,500 22/12/2022
SLC/PS/HTR/22/125
Maintenance of Commercial and
Domestic Fire Suppression
Systems
FES Ltd
Maintenance of Commercial and
Domestic Fire Suppression
Systems
£1,932,287.50 05/01/2023
SLC/PS/HTR/22/248 Headhouse Court Warden Call
System - QQ for Works Chubb Security Ltd Headhouse Court Warden Call
System - QQ for Works £74,003.53 09/01/2023
SLC/PS/HTR/22/023
Supply, Delivery and Hire of
Secure Site Containers and
Welfare Units
SIBCAS Ltd
Supply, Delivery and Hire of
Secure Site Containers and
Welfare Units
£250,000 16/01/2023
SLC/PS/HTR/22/263 Removal of Asbestos and
Remedial Works Aspect Contracts Ltd  Removal of Asbestos and
Remedial Works £1,700,000 19/01/2023
SLC/PS/HTR/22/149
South Lanarkshire Council
Almada Street HQ HV/LV Switch-
board Upgrade
SPIE Scotshield Ltd
South Lanarkshire Council
Almada Street HQ HV/LV Switch-
board Upgrade
£259,737 25/02/2023
91

Page 92

Project Ref Title Winning Contractor Brief Description of Work Contract Sum Letter of Acceptance
Issued
SLC/PS/HTR/22/172 Maintenance of Air Conditioning
and Air Handling Units
Diamond Air Conditioning
Ltd
Maintenance of Air Conditioning
and Air Handling Units £536,379.30 07/02/2023
SLC/PS/HTR/22/040 Supply and Delivery of Paint,
Paint Sundries and Paint Packs Crown Paints Ltd Supply and Delivery of Paint,
Paint Sundries and Paint Packs £239,579.96 20/02/2023
SLC/PS/HTR/21/425
Supply, Installation and
Maintenance of a Secure Door
Entry System in Council Offices
SPIE Scotshield Ltd
Supply, Installation and
Maintenance of a Secure Door
Entry System in Council Offices
£133,531.31 21/03/2023
SLC/PS/HTR/22/376
Eddlewood Deck Access
Hamilton, Blocks Phase 1 -
External Fabric &   Walkway
Repairs
Procast Contractors Ltd
Eddlewood Deck Access
Hamilton, Blocks Phase 1 -
External Fabric &   Walkway
Repairs
£974,629.51 22/03/2023
SLC/PS/HTR/21/362 Coalburn Leisure Centre CMM Pools Ltd Installations & Remedials £60,449.13 27/03/2023
SLC/PS/HTR22/335
Supply, Delivery and Hire of
Temporary Appliances for
Commercial Properties
Flogas Britain Ltd
Supply, Delivery and Hire of
Temporary Appliances for
Commercial Properties
£95,471.75 30/03/2023       
92