Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 30 September 2025 
Dear Councillor 
Housing and Technical Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 08 October 2025
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Davie McLachlan (Chair), Margaret Cowie (Depute Chair), Joe Fagan (ex officio), Walter Brogan,
Archie Buchanan, Mathew Buchanan, Janine Calikes, Gerry Convery, Margaret Cooper, Andrea
Cowan, Maureen Devlin, Colin Dewar, Allan Falconer, Grant Ferguson, Alistair Fulton, Ross
Gowland, Geri Gray, Martin Lennon, Richard Lockhart, Julia Marrs, Ian McAllan, Kenny McCreary,
Norman Rae, Kirsten Robb, David Shearer, Kirsty Williams 
Substitutes
Robert Brown, Monique Equi, Gladys Ferguson-Miller, Elise Frame, Martin Hose, Cal Johnston-
Dempsey, Susan Kerr, Eileen Logan, Richard Nelson, Helen Toner, Margaret B Walker, David
Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Housing and Technical Resources Committee
held on 13 August 2025 submitted for approval as a correct record.  (Copy
attached) 
5 - 18 
3 Minutes of the Asset Transfer Appeals Panel
Minutes of the Asset Transfer Appeals Panel held on 4 September 2025
submitted for approval as a correct record.  (Copy attached) 
19 - 22 
Monitoring Item(s) 
4 Housing and Technical Resources - Revenue Budget Monitoring 2025/2026
- (Excl Housing Revenue Account (HRA))
Joint report dated 8 September 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources). (Copy attached) 
23 - 28 
5 Housing and Technical Resources - Revenue Budget Monitoring 2025/2026
- Housing Revenue Account (HRA)
Joint report dated 8 September 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
29 - 32 
6 Housing and Technical Resources - Capital Budget Monitoring 2025/2026
(excl. Housing Revenue Account (HRA))
Joint report dated 17 September 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
33 - 36 
7 Housing and Technical Resources – Capital Budget Monitoring 2025/2026
(Housing Revenue Account)
Joint report dated 10 September 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
37 - 40 
8 Housing and Technical Resources – Workforce Monitoring – 1 June to 31
July 2025
Joint report dated 28 August 2025 by the Executive Directors (Finance and
Corporate Resources) and (Housing and Technical Resources).  (Copy
attached) 
41 - 48 
Item(s) for Decision 
9 Housing and Technical Resources' Workforce Plan
Report dated 5 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
49 - 90 
10  Scottish Housing Regulator – Annual Assurance Statement 2024/2025
Report dated 17 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
91 - 98
2

Page 3

11  Additional Staffing – Building Services
Joint report dated 25 September 2025 by the Executive Directors (Housing and
Technical Resources) and (Finance and Corporate Resources).  (Copy
attached) 
99 - 104 
12  Acquisition of Right of Access to Land and Construction of Affordable
Homes at Calderwood Road, East Kilbride
Report dated 18 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
105 - 110 
13  Thankerton Hall – Community Asset Transfer to the Thancard Trust
Report dated 17 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
111 - 116 
14  Carstairs Junction Hall – Community Asset Transfer to Soul of the
Junction SCIO
Report dated 18 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
117 - 122 
15  Review of the Community Asset Transfer Assessment and Approval
Process
Report dated 11 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
123 - 130 
Item(s) for Noting 
16  Annual Report - Mainstreaming Equality and Diversity within Housing and
Technical Resources
Report dated 17 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
131 - 142 
17  Update of the Housing and Technical Resources Risk Register
Report dated 17 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
143 - 166 
18  Annual Review of the Housing Services Customer Involvement Strategy
2024 to 2029
Report dated 27 August 2025 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
167 - 172 
Urgent Business 
19  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Laura Cunningham
Clerk Telephone: 07385 370044
Clerk Email: laura.cunningham2@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

HOUSING AND TECHNICAL RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 13 August 2025 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor
Gerry Convery, Councillor Andrea Cowan, Councillor Margaret Cowie (Depute), Councillor Maureen
Devlin, Councillor Colin Dewar, Councillor Allan Falconer, Councillor Grant Ferguson, Councillor
Geri Gray, Councillor Martin Lennon, Councillor Richard Lockhart, Councillor Julia Marrs, Councillor
Ian McAllan, Councillor Kenny McCreary, Councillor Norman Rae, Councillor Kirsten Robb,
Councillor David Shearer, Councillor Helen Toner (substitute for Councillor Janine Calikes),
Councillor Kirsty Williams 
Councillors' Apologies:
Councillor Janine Calikes, Councillor Margaret Cooper, Councillor Joe Fagan (ex officio), Councillor
Alistair Fulton, Councillor Ross Gowland 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); L Cunningham, Administration Officer; J Davitt, Public
Relations Team Leader; K Gowrie, Finance Adviser; E-A McGonigle, Administration Adviser; E
McPake, Human Resources Business Manager; L Wyllie, Administration Assistant
Housing and Technical Resources
S Egan, Interim Executive Director; J Fernie, Homelessness and Housing Support Manager; L
Hayes, Performance and Support Adviser; C Jardine, Head of Property Services; G McParland,
Property Manager (Assets and Estates); C Mitchell, Interim Head of Housing Services; T O’Donnell,
Area Housing Manager 
1 Declaration of Interests 
Councillor(s) Item(s) Nature of Interest(s)
Marrs  Community Asset Transfer of Castlebank
House Outbuildings to Lanark Community
Development Trust 
Adviser to the Community
Development Trust 
2 Minutes of Previous Meeting
The minutes of the meeting of the Housing and Technical Resources Committee held on 14 May
2025 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Minutes of the Asset Transfer Appeals Panel
The minutes of the Asset Transfer Appeals Panel held on 16 May 2025 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.
2
5

Page 6

4 Housing and Technical Resources’ Revenue Budget Monitoring 2024/2025 - (Excl
Housing Revenue Account (HRA))
A joint report dated 18 June 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising of
the actual expenditure measured against the revenue budget for the period 1 April 2024 to 31
March 2025 for Housing and Technical Resources (excl HRA). 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to D of the report. 
As at 31 March 2025, the year-end outturn position for the Resource was an underspend of
£1.718 million before transfers to reserves, as detailed in Appendix A to the report.  A breakeven
position was reported after transfers to reserves of £0.705 million and £1.013 million, approved
by the Executive Committee on 12 February 2025 and 25 June 2025 respectively. 
Virements were proposed to realign budgets and those were detailed in appendices C and D to
the report. 
The Committee decided: 
(1) that the breakeven position as at 31 March 2025, after approved transfers to reserves, as
detailed in Appendix B to the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 14 May 2025 (Paragraph 5) and Minutes of the Executive Committee of
12 February 2025 (Paragraph 3) and 25 June 2025 (Paragraph 3)] 
5 Revenue Budget Monitoring 2024/2025 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 24 June 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising of
the actual expenditure measured against the revenue budget for the period 1 April 2024 to 31
March 2025 for Housing and Technical Resources (HRA). 
As at 31 March 2025, there was a breakeven position against the phased budget after a transfer
to the HRA Reserve of £2.974 million.  This transfer from reserves was £0.430 million higher
than the latest probable outturn position because of an overspend on Loan Charges due to
interest charges being greater than anticipated, and an overspend in repairs and maintenance
costs, as detailed in paragraph 5.2 of the report.   
The Head of Property Services responded to a member’s questions in relation to the overspend
in planned maintenance and, where information was not readily available, undertook to provide
this to members. 
The Committee decided: 
(1) that the forecast breakeven position on Housing and Technical Resources’ (HRA) revenue
budget, as detailed in Appendix A of the report, be noted; and 
6

Page 7

(2) that the proposed budget virements be approved. 
[Reference: Minutes of 14 May 2025 (Paragraph 4) and Minutes of the Executive Committee of
24 June 2025 (Paragraph 3)] 
6 Revenue Budget Monitoring 2025/2026 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 27 June 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising of
the actual expenditure measured against the revenue budget for the period 1 April to 16 May
2025 and a forecast for the year to 31 March 2026 for Housing and Technical Resources (excl
HRA). 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to D of the report. 
As at 16 May 2025, the projected outturn position for the Resource for 2025/2026 was a
breakeven position. 
Virements were proposed to realign budgets and those were detailed in appendices B to D of
the report. 
The Committee decided: 
(1) that the forecast to 31 March 2026 of a breakeven position, as detailed in Appendix A of
the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of the Executive Committee of 25 June 2025 (Paragraph 4)] 
7 Revenue Budget Monitoring 2025/2026 - Housing and Technical Resources -
Housing Revenue Account (HRA)
A joint report dated 27 June 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising of
the actual expenditure measured against the revenue budget for the period 1 April to 16 May
2025 and a forecast for the year to 31 March 2026 for Housing and Technical Resources (HRA). 
As at 16 May 2025, there was a forecast breakeven position against the budget, as detailed in
Appendix A to the report.  The actual position as at 16 May 2025 was a net position of £6.116
million which reflected the timing of income and expenditure at that time. 
The Committee decided: 
(1) that the forecast of a breakeven position on the Housing and Technical Resources’ (HRA)
revenue budget, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of the Executive Committee of 25 June 2025 (Paragraph 4)]
7

Page 8

8 Capital Budget Monitoring 2024/2025 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 14 July 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising of
progress on the capital programme for Housing and Technical Resources (excl HRA) for the
period 1 April 2024 to 31 March 2025. 
The Housing and Technical Resources’ capital programme for 2024/2025 was £9.984 million. 
Total expenditure to 31 March 2025 was £7.379 million, which resulted in an underspend of
£2.605 million.  This forecast underspend reflected the timing of spend across financial years, as
detailed in paragraphs 5.2 and 5.3 of the report.  The main projects responsible for the
underspend were detailed in Appendix B to the report.  Any underspend on those projects, along
with the funding, had been carried forward into the next financial year. 
At the year-end 2024/2025, £4.301 million of capital spend was required to be recorded as
revenue spend.  This transfer meant that, for the purpose of publishing the Annual Accounts
only, there was Capital spend of £3.078 million.  Details of the accounting adjustments were
provided in paragraph 5.5 of the report. 
The Committee decided: that the Housing and Technical Resources’ (excl HRA)
capital programme of £9.984 million, and expenditure for
the year of £7.379 million, be noted. 
[Reference: Minutes of 14 May 2025 (Paragraph 7)] 
9 Capital Budget Monitoring 2024/2025 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 18 July 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising on
the progress of the capital programme for Housing and Technical Resources (HRA) for the
period 1 April 2024 to 31 March 2025. 
The Housing Capital Programme for 2024/2025 totalled £77.248 million, as detailed at Appendix
A to the report.  This budget was based on the original programme approved by the Council in
February 2024, budget carried forward from financial year 2023/2024 and the Scottish
Government Affordable Housing Grant available for 2024/2025. 
Actual expenditure on the Housing Capital Programme was £71.544 million, which represented
an underspend of £5.704 million, as detailed in paragraph 5.2 of the report.  The total approved
Housing Capital Programme for 2025/2026 included an assumed carry forward of £4.136
million, therefore, an additional £1.568 million would be carried forward and included in the
2025/2026 Capital Programme 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £77.248 million, and expenditure to
31 March 2025 of £71.544 million, be noted. 
[Reference: Minutes of 14 May 2025 (Paragraph 6) and Minutes of the Executive Committee of
25 June 2025 (Paragraph 5)]
8

Page 9

10 Capital Budget Monitoring 2025/2026 - Housing and Technical Resources (Excl
Housing Revenue Account (HRA))
A joint report dated 14 July 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted providing
information on the progress of the capital programme for Housing and Technical Resources
(excl HRA) for the period 1 April to 16 May 2025. 
The revised budget of £10.664 million was based on the overall Capital Programme for
2025/2026 and included adjustments approved by the Executive Committee on 26 February
2025 and 25 June 2025 which totalled a net increase of £0.536 million.  Details of those
amendments were provided in Appendix A to the report.   
Forecast for the financial year was £10.664 million, as detailed in Appendix A to the report. 
Actual expenditure at 16 May 2025 was £0.212 million.   
The Committee decided: that the Housing and Technical Resources’ capital
programme of £10.664 million, and forecast expenditure of
£10.664 million, be noted. 
[Reference: Minutes of the Executive Committee of 26 February 2025 (Paragraph 4) and 25
June 2025 (Paragraph 6)] 
11 Capital Budget Monitoring 2025/2026 - Housing and Technical Resources
(Housing Revenue Account (HRA))
A joint report dated 27 June 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted advising on
progress of the capital programme for Housing and Technical Resources (HRA) for the period 1
April to 16 May 2025. 
The revised Housing Capital Programme for 2025/2026 was £87.540 million, as detailed at
Appendix A to the report.  This budget was based on the original programme approved by the
Council on 26 February 2025 and updated to include budget carried forward from financial year
2024/2025 and the Scottish Government Affordable Housing Grant for 2025/2026.   
The forecast for 2025/2026 from Housing and Technical Resources had identified an outturn of
£87.540 million for the year, The spend to 16 May 2025 on the Housing Capital Programme
amounted to £2.462 million and £2.462 million of funding had been received. 
The Committee decided: that the revised Housing and Technical Resources’ (HRA)
capital programme of £87.540 million, and actual
expenditure to 16 May 2025 of £2.462 million, be noted. 
[Reference:  Minutes of the Executive Committee of 25 June 2025 (Paragraph 6)] 
12 Housing and Technical Resources – Workforce Monitoring – 1 March to 31 May
2025
A joint report dated 12 June 2025 by the Executive Director (Finance and Corporate Resources)
and Interim Executive Director (Housing and Technical Resources) was submitted on the
following employee information for Housing and Technical Resources for 1 March to 31 May
2025:- 
 attendance statistics
9

Page 10

 occupational health statistics
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 8 March 2025 
The Committee decided: that the report be noted. 
[Reference: Minutes of 14 May 2025 (Paragraph 8)] 
13 Housing and Technical Resource Plan - Quarter 4 Progress Report 2024/2025
A report dated 30 June 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted on the Housing and Technical Resource Plan Quarter 4 Progress
Report for 2024/2025 for the period 1 April 2024 to 31 March 2025. 
The Resource Plan measures were rated using a traffic light system of red, amber, or green as
well as blue (BRAG) which indicated that an action had been completed. 
Details were provided on: - 
 progress made in implementing the priority projects identified in the Resource Plan
2024/2025, as detailed in paragraph 5.2 and attached as Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in paragraph 5.3 of the
report
 areas for improvement and associated management actions, as detailed in paragraph 5.4
of the report
 additional scrutiny of changes in BRAG status between Quarter 2 and Quarter 4, as
summarised in paragraph 5.5 and detailed at Appendix 3 to the report 
The Committee decided: 
(1) that the Housing and Technical Resource Plan Quarter 4 Progress Report 2024/2025, as
summarised at paragraph 5.2 and detailed in Appendix 2 of the report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in paragraph 5.3 of
the report, be noted; 
(3) that the areas for improvement and associated management actions, as detailed in
paragraph 5.4 of the report, be noted; and 
(4) that the additional scrutiny of changes in measure status between Quarter 2 and Quarter
4, as summarised at paragraph 5.5 and detailed in Appendix 3 of the report, be noted. 
[Reference: Minutes of 24 November 2024 (Paragraph 8)] 
14 Acquisition of Houses at Eaglesham View, Eaglesham Road, East Kilbride -
Section 75 Planning Reference PL/21/1616
A report dated 3 July 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted requesting approval to acquire 40 homes at the Eaglesham View Development,
Eaglesham Road, Jackton, East Kilbride from Barratt Homes, for inclusion in the Council’s
housing stock, in fulfilment of the planning obligations associated with the development of the
residential sites.
10

Page 11

The Local Housing Strategy 2022 to 2027 was approved at the Executive Committee on 30
November 2022 and highlighted the commitment by the Council and partners to actively seek
opportunities to develop housing across South Lanarkshire to both meet housing need and
support social and economic regeneration. On 8 November 2023, the Strategic Housing
Investment Programme 2024 to 2029, was approved by this Committee and included a total
potential capacity for delivering up to 2,442 affordable homes in South Lanarkshire over a 5-year
period to March 2029, and included reference to properties within the Barratt development off
Eaglesham Road, East Kilbride. 
In December 2022, the Council entered discussions with Barratt Homes to fulfil its planning
obligation for new affordable homes, as detailed in paragraph 4.1 of the report.  The proposal
had been assessed by the Council’s relevant technical and commercial services as presenting
value for money for the Council.  It was proposed to acquire 40 completed houses from Barratt
Homes, subject to the following principal conditions:- 
 the Council would pay a land payment prior to works commencing and take ownership of
the site
 the balance for each unit would then be paid in the following stages – floor slab, wind and
watertight, and completion
 the Council would receive a third-party warranty covering defects and structure for a period
of no less than 10 years
 each party would be responsible for their own legal fees 
The Interim Head of Housing Services responded to a member’s questions on various aspects
of the report and, where information was not readily available, undertook to provide this to
members. 
The Committee decided: 
(1) that the acquisition of 40 completed affordable homes from Barratt Homes for a total price
of £8,738,502 (which included the cost of land), to fulfil the planning obligations associated
with the residential development of the sites, be approved; and 
(2) that the Interim Executive Director (Housing and Technical Resources) be given delegated
authority to authorise the transactions and instruct Legal Services to conclude transactions
in the appropriate manner and in the best interests of the Council, with each individual
transaction being in excess of the current £100,000 acquisition limit under the existing
delegated powers arrangements. 
[Reference: Minutes of 8 November 2023 (Paragraph 8) and Minutes of the Executive
Committee of 30 November 2022 (Paragraph 7)] 
15 Castlebank House Outbuildings - Community Asset Transfer to Lanark
Community Development Trust
A report dated 3 July 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted advising of a request for the disposal of Castlebank House outbuildings to Lanark
Community Development Trust under Community Asset Transfer (CAT) and requesting
approval of the principal terms and conditions of asset transfer, as detailed in the report. 
Castlebank House, Lanark, was a category B listed, 3-storey, former country house purchased
by the Royal Burgh of Lanark from Margrave Estates in 1952.  The property and associated
ancillary buildings were situated within the grounds of Castlebank Park, with access to the
property through a traditional gate house and single track, stone chipped road through the park. 
The property was constructed around 1760.
11

Page 12

A full building survey was completed on Castlebank House in 2014 and concluded that the
Council properties and wider building would require significant investment if they were to meet
the required Scottish Housing Quality Standard (SHQS) or energy efficiency standard, as
detailed in paragraph 3.2 of the report.  On 30 August 2023, this Committee approved the
recommendation to declare surplus and dispose of 4 vacant properties within Castlebank House
and formally engage with the remaining tenants and residents to discuss the Council’s
intentions. 
Lanark Community Development Trust had submitted a request for a CAT by sale of the
outbuildings, with the application being validated on 3 February 2025.  The Trust wished to
solidify its income streams to protect its future.  Details of the application and related documents
were contained in the Council’s Planning Portal under reference CAT/25/0001.  Further details
of the property, the organisation and the project were provided in paragraphs 3.6 to 3.8 of the
report. 
It was proposed to sell Castlebank House outbuildings to Lanark Community Development
Trust, subject to the principal terms and conditions detailed in paragraph 5.1 of the report. 
The Property Manager (Assets and Estates) responded to a member’s question in relation to the 
conditions of sale. 
The Committee decided: 
(1) that the subjects at Castlebank House Buildings, Castlebank Park, Lanark be disposed to
Lanark Community Development Trust, subject to the terms and conditions detailed in
section 5 of the report; and 
(2) that the Interim Executive Director (Housing and Technical Resources), in consultation
with the Head of Administration and Legal Services, be authorised to conclude all matters
in respect of the lease and enter into the necessary legal agreements on terms which were
in the best interests of the Council. 
[Reference:  Minutes of 30 August 2023 (Paragraph 15)] 
Councillor Marrs, having declared an interest in the above item of business, withdrew from the
meeting during its consideration 
In terms of Standing Order No 14, the Chair adjourned the meeting following this item of business at
10.57am.  The meeting reconvened at 11.07am 
16 Update on Asylum and Refugee Resettlement Programmes
A report dated 23 July 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted:- 
♦ providing an update on the various asylum and refugee resettlement programmes relevant
to South Lanarkshire, specifically including:- 
 the consolidation of various refugee resettlement programmes available to those
from Afghanistan
 the recent UK Government “ask” of all local authorities to participate in a new Afghan
Refugee Resettlement (ARP) Programme
♦ highlighting immigration and asylum changes managed by the UK Government through
the Home Office
♦ providing an overview of the Council’s contribution to refugee resettlement across all
Home Office and Scottish Government programmes, including projections for future
demand and anticipated impact
12

Page 13

Following the withdrawal of American Armed Forces from Afghanistan in August 2021, the UK
Government reviewed the Afghan Relocations and Assistance Policy (ARAP) which allowed
Afghan nationals to apply for resettlement in the UK. 
Various pathways had been developed for Afghan nationals who sought support and relocation
to the UK.  Those pathways supported groups such as, individuals who worked alongside the
UK Armed Services and those under the Afghan Citizens’ Resettlement Scheme (ACRS). 
Information was provided on:- 
♦ the new Afghan Resettlement Programme (ARP), which focused on individuals and
families currently in transitional accommodation awaiting settled housing throughout the
UK, as detailed in section 4 of the report
♦ national asylum arrangements, as detailed in section 5 of the report.  The UK Government
continued to progress national dispersal of asylum seekers to ease disproportionate
pressure in certain regions of England and end the extensive use of hotel accommodation. 
Although local authorities had no official role in relation to asylum seekers, within South
Lanarkshire, officers were proactively engaged nationally and locally in discussions
♦ the context in South Lanarkshire, as detailed in section 6 of the report, which included:-
 engagement in discussions with the Ministry of Defence (MoD) in relation to sourcing
hotel accommodation to replace the temporary use of MoD accommodation to
progress national dispersal plans
 engagement with the Home Office to provide an understanding of the Council’s
position, namely that transitional accommodation should not be located within the
most pressurised areas, and that separate and appropriate funding must be provided
to cover associated costs
 continuing to support the ARP under the traditional resettlement approach which
matched households to settled accommodation with support being delivered by the
Council’s Refugee Resettlement Service and provision of support to families
accommodated in South Lanarkshire on a temporary basis (in MoD or Mears sourced
accommodation)
 continuing the approach, approved by the Executive Committee on 29 January 2020,
to resettle 30 families (approximately 180 individuals) per year, which was a total
figure across all programmes including Afghan, Ukraine and the UK Refugee
Resettlement Scheme
♦ the next steps which would be undertaken by the Council’s Asylum and Refugee
Resettlement Service, as detailed in section 7 of the report, whereby officers would
continue to:-
 closely monitor asylum and refugee resettlement developments
 work with COSLA, local authorities’ Resettlement Services, the Home Office, the
MoD and the UK Government on addressing issues and highlighting financial
requirements
 provide updates to the Committee on developments 
The Homelessness and Housing Support Manager responded to members’ questions on various
aspects of the report. 
The Committee decided: 
(1) that it be agreed that the Refugee Resettlement Programme would continue to provide
support on the basis approved by the Executive Committee on 29 January 2020 (providing
support to up to 30 families per year); 
(2) that it be noted that officers would continue to engage with the UK Government and the
Scottish Government, as well as COSLA representatives, to maintain awareness of
refugee programme developments and their likely impact on South Lanarkshire; and
13

Page 14

(3) that it be noted that officers would continue to engage with the UK Government, through
the Home Office and COSLA representatives, to stay informed about immigration and
asylum changes and their potential impact across the UK, Scotland and South
Lanarkshire. 
[Reference:  Minutes of 24 April 2024 (Paragraph 15)] 
17 Acquisition of 4 Properties at Christie Place, Cambuslang to Progress Removal of
Reinforced Autoclaved Aerated Concrete (RAAC)
A report dated 30 June 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted providing an update on the proposals to potentially purchase 4
properties at Christie Place, Cambuslang from owner occupiers to progress the removal of
reinforced autoclaved aerated concrete (RAAC) and deliver associated improvement works. 
Following the confirmation of potentially dangerous RAAC at 3 tenement blocks in Christie,
Place, Cambuslang, on 14 May 2025 the Committee approved removal of the RAAC, together
with a series of energy efficient improvement works, as detailed in paragraph 3.1 of the report. 
The Council was the majority owner in each of the tenement blocks and could, therefore, instruct
the removal works to go ahead. Since the last report to the Committee, it had been confirmed
that the 4 non-council owned properties in the blocks were private rented sector and were
currently tenanted.  Regardless of current housing tenure, those owners were liable for the costs
of removing RAAC and other improvements. 
To support the progress of work to remove the RAAC in Christie Place, it was proposed that the
Council commence engagement with the owners (private landlords) with an option being offered
whereby the homes were acquired through the Council’s Market Purchase Scheme. Valuation of
the properties would require the deduction of the removal of RAAC and the associated costs. 
Further details were provided in section 4 of the report. 
The next steps were outlined in section 5 of the report and included engagement with the 4
property owners. Timescales for commencing the work at Christie Place would be subject to
agreement from the property owners and current tenants, and the successful acquisition of the
properties. 
The Committee decided: that the proposal to potentially purchase 4 properties at
Christie Place, Cambuslang, through the Market Purchase
Scheme, to progress the removal of Reinforced Autoclaved
Aerated Concrete (RAAC) and deliver improvement works,
be noted. 
[Reference:  Minutes of 14 May 2025 (Paragraph 11)] 
Councillor Toner left the meeting during this item of business 
18 Homelessness Update
A report dated 23 July 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted providing an update on the continuing pressure on homelessness
services and the impact of Committee approved mitigations.
14

Page 15

Regular updates had been provided to the Committee since the Council declared a housing
emergency on 12 June 2024, outlining the severe pressure placed on homelessness services
due to high levels of demand. This position, alongside the conclusion of the Scottish
Government led Rapid Re-Housing Transition Plan (RRTP) approach in March 2024, led to a
range of mitigations being incorporated within a refreshed Homelessness Strategic Action Plan
2024/2025. 
Information was provided on:- 
♦ joint working with the Scottish Government by Housing Services because South
Lanarkshire was one of 5 local authorities experiencing the greatest surge in demand for
homelessness assistance
♦ the further year of RRTP funding being allocated to local authorities
♦ the focus being placed on scaling up the supply of good quality, temporary
accommodation to meet the current demand.  This included:- 
 plans to introduce new supported accommodation by the end of 2025, in partnership
with Social Bite
 a proposal, approved by the Executive Committee on 25 June 2025, to create
additional emergency First Stop Accommodation using an existing council asset (the
former Beckford Street Business Centre)
♦ a comparison of 2022/2023 and 2024/2025 performance measures identified to gauge the
impact of mitigations 
The next steps were outlined in section 5 of the report.  Progress would continue to be reported
to the Committee on a 6-monthly basis. 
The Committee decided: 
(1) that the scale and nature of continued high demand for housing and homelessness
assistance, both nationally and locally, be noted; and 
(2) that the impact of mitigating actions, as set out in the current Homelessness Strategic
Action Plan, be noted. 
[Reference: Minutes of 26 February 2025 (Paragraph 10) and Minutes of the Executive
Committee of 25 June 2025 (Paragraph 11)] 
Councillor McCreary left the meeting during this item of business 
19 Rent Management Update
A report dated 30 June 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted providing an update on rent management, including services in place
to support tenants manage their rent accounts. 
The Housing Services’ Rent Management Policy was approved by the Executive Committee on
24 June 2020 and implemented from September that year. The overarching aim of the policy
was to achieve an appropriate balance between ensuring tenants were clear about their
responsibility to pay their rent, whilst remaining mindful of an individual’s circumstances. 
The key aspects of the Council’s approach were:- 
 prevention
 early intervention
 person-centred
 supporting tenants to sustain their tenancy
15

Page 16

Detailed information was provided in sections 4 to 6 of the report on the following issues:- 
 supporting tenants
 rent management performance
 the future development of rent management 
The Committee decided: that the content of the report be noted. 
[Reference: Minutes of 1 April 2020 (Paragraph 9) and Minutes of the Executive Committee of
24 June 2020 (Paragraph 11)] 
20 Housing (Scotland) Bill 2024 – Consultation on Rent Controls
A report dated 11 June 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted:- 
 providing an update on the Housing (Scotland) Bill 2024 
 detailing the Council’s response to the Scottish Government consultation on rent controls,
which closed on Friday 18 July 2025 
The introduction of the Housing (Scotland) Bill fulfilled the 2023/2024 Programme for
Government commitment to bring forward housing legislation.  The Bill outlined proposals, as
part of the delivery of the Scottish Government’s ‘New Deal for Tenants' continued reform of the
rented sector, and some aspects of ‘Housing to 2040’. 
The Bill aimed to contribute to creating a well-regulated rented sector, which balanced the needs
of tenants and landlords, and the introduction of a duty to ‘Ask and Act’, which would create a
shared public responsibility to prevent homelessness. To achieve this, the Bill covered a range
of topics related to housing and homelessness prevention. 
The Council had provided responses to the previous 4 consultations and calls for views by the
Scottish Government on the Bill in relation to the various proposals, including private sector rent
controls, evictions and homelessness. 
Throughout the development of the Bill, the Scottish Government had continued to consult with
stakeholders who had called for greater clarity on how rent controls would be implemented and
how rents would be capped in areas where rent control applied.  In response to this, the Scottish
Government launched a 12-week consultation on 23 April 2025 which sought views on a
number of key areas, as detailed in paragraph 4.2 of the report.  The Council’s consultation
response was provided in the appendix to the report.     
It was envisaged that Stage 3 would happen in September 2025 with Royal Assent in autumn,
as detailed in paragraph 5.1 of the report. 
The Interim Head of Housing Services responded to members’ questions in relation to:- 
 the position for student accommodation
 the proposals to exempt Mid Market Rent (MMR) and Build to Rent (BtR) properties from
the application of rent controls 
The Interim Head of Housing Services undertook to provide further information direct to the
relevant member on the proposals to exempt MMR and BtR properties from the application of
rent controls.
16

Page 17

The Committee decided: 
(1) that the current status of the Housing (Scotland) Bill 2024 be noted; and 
(2) that the Council’s response to the consultation, as detailed in the appendix to the report,
be noted. 
21 Delegated Authority Report - Update
A report dated 24 June 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted on transactions processed by Property Services during Quarter 4 of
2024/2025 and providing a year-end summary. 
The Executive Director (Housing and Technical Resources), under delegated powers, had
authority to deal with various transactions including:- 
 leases up to the value of £50,000 per annum and a maximum period of 20 years
 rent reviews up to an increase of £20,000 per annum
 disposals up to a value of £200,000
 acquisitions up to a value of £200,000 
Details of the transactions undertaken during Quarter 4, as contained in Appendix 1 of the
report, were as follows:- 
Quarter 4 2024/2025:
Number of transactions 45
Total value of lease transactions £97,194.00 per annum
Total value of capital transactions £2,546,525.00
Total value of miscellaneous transactions Nil 
Annual Summary 2024/2025:
Number of transactions 255
Total value of lease transactions £446,743.60 per annum
Total value of capital transactions £14,153,467.25
Total value of miscellaneous transactions £15.00 
The Committee decided: that the transactions processed by delegated authority by
Property Services during Quarter 4 of 2024/2025, together
with the year-end summary of all such transactions, be
noted. 
[Reference: Minutes of 25 February 2025 (Paragraph 16)] 
22 Notification of Contracts Awarded - 1 October 2024 to 31 March 2025
A report dated 3 July 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted on contracts awarded by Housing and Technical Resources, valued in excess of
£50,000, in the period 1 October 2024 to 31 March 2025. 
In terms of Standing Order No 21.8 of the Council’s Standing Orders on Contracts, Resources
were required to notify the relevant committee of contracts awarded above the sum of £50,000. 
Details of the contracts awarded or extended were provided in the appendices to the report.
17

Page 18

The Committee decided: that the details of the contracts awarded be noted. 
[Reference: Minutes of 27 November 2024 (Paragraph 18)] 
23 Urgent Business 
There were no items of urgent business. 
18

Page 19

ASSET TRANSFER APPEALS PANEL 
Minutes of meeting held via Microsoft Teams and in Committee Room 5, Council Offices, Almada
Street, Hamilton on 4 September 2025 
Chair:
Councillor Davie McLachlan 
Councillors Present:
Councillor Margaret Cowie, Councillor Geri Gray 
Attending:
Community and Enterprise Resources
T Finn, Resource Adviser to the Asset Transfer Appeals Panel
Finance and Corporate Resources
D McLardy, Legal Adviser to the Asset Transfer Appeals Panel; T Slater, Administration Adviser 
1 Declaration of Interests 
No interests were declared. 
2 Review of Case – Application CAT/24/0014 for Community Asset Transfer of
Murray Pitches and Pavilion, Liddell Grove, East Kilbride
A report dated 8 August 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted on a request, in terms of The Asset Transfer Request (Procedure)
(Scotland) Regulations 2016, for a review of the decision taken by officers to refuse an asset
transfer request (application CAT/24/0014) made by East Kilbride Burgh United (EKBU) in
relation to Murray Pitches and Pavilion, Liddell Grove, East Kilbride. 
To assist the Asset Transfer Appeals Panel in its review, copies of the following information had
been appended to the report:- 
 aerial photograph and site plan
 asset transfer request form
 EKBU’s:-
 Constitution
 Business Plan
 pitch maintenance plan
 community benefit assessment in respect of EKBU
 community benefit assessment in respect of South Lanarkshire Leisure and Culture
(SLLC)
 Community Asset Transfer Panel meeting note of 9 April 2025
 Decision Notice
 request for review and additional information 
The Panel heard the Legal Adviser in relation to:- 
 the legal background to the case
 statutory criteria which required to be considered in relation to the case 
 the Asset Transfer Request (Review Procedure) (Scotland) Regulations 2016 which set
out the procedure to be followed in relation to the review
 the options available to the Panel in determining the review
3
19

Page 20

The Panel also heard the Resource Adviser in relation to:- 
 the application process
 issues which required to be considered in relation to the case including:-
 benefits resulting from the request
 ability of the applicants to deliver the proposal
 impact on the Council’s ability to deliver its functions
 obligations or restrictions in relation to the request
 other matters such as community support for the proposal 
The Panel noted that the applicant’s stated preference was for the review to be dealt with as a
hearing.  On the basis of the information submitted, the Panel considered it had sufficient
information to allow it to proceed to determine the review.  The options available to the Panel
were to confirm, modify or substitute with a different decision, the decision taken in respect of
the application under review. 
In reviewing the case, the Panel considered:- 
 the information submitted by all parties
 statutory matters
 any views of the local community in relation to the proposal, noting that no responses had
been received to the public consultation 
Following its review of the information and after discussion, the Panel concluded that the
officers’ decision to refuse the asset transfer request be confirmed for the reasons set out in the
Decision Notice of 15 May 2025, as follows:- 
 the benefits of the asset transfer request were judged to be less than the benefits of the
continued operation by SLLC and agreeing to the request would restrict SLLC’s ability to
carry out its function for the Council as a sports and culture facility and negatively impact
the delivery of its objectives as a Scottish Charitable Incorporated Organisation
 in considering the proposal, the Council had to balance consideration of the benefits and
investment that could be delivered through the transfer of the property to an organisation,
such as EKBU, against the benefits of the continued delivery of services at this facility
which provided a positive contribution to SLLC and supported both SLLC and the Council
in the broader delivery of services
 the Murray pitch cluster made up an important element of SLLC’s East Kilbride provision
and pitch strategy allowing the Council, through SLLC, to provide the appropriate assets
locally. In this case, the showers and multiple pavilions enabled the Council, through
SLLC, to accommodate both youth and adult football whilst offering suitable, appropriate
changing facilities for a range of users, including minority groups who might need
separate changing facilities. If this cluster was not retained within the operational portfolio,
SLLC would be unable to provide the same standard of provision for those groups at
alternative East Kilbride venues which did not have the same facilities or adequate
parking, and this would negatively impact local groups and displace users
 the site contributed to the broader provision and SLLC and the Council worked
collaboratively to ensure there was an estates strategy and building life cycle provision.
This ensured maintenance and replacement programmes were in place
 the Council’s governance provided oversight and ensured that a broad range of users,
including minority groups, were catered for and that assets remained financially
accessible and equitable in provision strategically at both a local and regional level
 it was recognised that EKBU as an organisation had the ambition, capacity and
experience to deliver a service. However, for the reasons set out above, it was believed
that the transfer of the asset to EKBU did not represent Best Value or deliver wider
community benefits
20

Page 21

The Legal Adviser to the Panel confirmed that a written decision would be issued within 21 days
of the date of this meeting. 
The Panel decided: that the decision taken by officers to refuse a request, in
terms of the Community Empowerment (Scotland) Act,
made by East Kilbride Burgh United for an asset transfer
(application CAT/24/0014) in relation to Murray Pitches and
Pavilion, Liddell Grove, East Kilbride be confirmed for the
reasons detailed above. 
3 Urgent Business 
There were no items of urgent business. 
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources - Revenue Budget
Monitoring 2025/2026 - (Excl Housing Revenue
Account (HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2025 to 8 August 2025 for Housing and Technical
Resources (excl HRA)
 provide a forecast for the year to 31 March 2026
[1pur
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the forecast to 31 March 2026 of a breakeven position, as detailed in
Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the second revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2025/2026. 
3.2. The report details the financial position for Housing and Technical Resources
(excluding HRA).  Appendix A provides the service analysis statement, outlining key
highlights by Service for the Resource and Appendices B to D provide the detailed
financial position with variance explanations by budget category. 
3.3 This report reflects the actual spend to 8 August 2025 within the Resource budget
and reflects the expected outturn forecast on expenditure and income at this date.   
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 8 August 2025, the Resource’s projected outturn position for 2025/2026 is a
breakeven position.  This is outlined in Appendix A. 
5.2. Virements are proposed to realign budgets. These movements have been detailed in
the appendices to this report, as appropriate.
4
23

Page 24

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.   
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
8 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kathleen Gowrie, Finance Manager
Ext:  2680 (Tel:  01698 452601)
E-mail :  kathleen.gowrie@southlanarkshire.gov.uk
24

Page 25

Appendix A 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period 5 Ended 08 August 2025 (No.5) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Housing Services 8,967 9,003 (36) -0.40% 4,496
Property Services 10,272 10,236 36 0.35% 2,914
Net Controllable Exp. 19,239 19,239 0 0.00% 7,410 
Service Heading Explanation for significant projected outturn variances
Housing Services  The minor overspend is mainly due to an increase in bed & breakfast costs within the Homelessness
service which are partially offset by an over recovery in income. 
Property Services 
There are minor forecast overspends within Office Accommodation that are offset by minor forecast
underspends within the Estate Services and the Scheme of Assistance budget, reflecting demand. 
There is also an underspend on employee costs within Building Services due to turnover, and an over
recovery in income which offsets an overspend in payment to contractors reflecting demand for
services. 
25

Page 26

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 08 August 2025 (No.5) 
Housing and Technical Resources Summary (excl HRA) 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 48,280 46,115 2,165 under 4.48% 15,363 
Property Costs 24,843 25,250 (407) over (1.64%) 9,752 
Supplies & Services 13,487 12,126 1,361 under 10.09% 4,419 
Transport & Plant 4,587 4,344 243 under 5.30% 1,436 
Administration Costs 3,729 3,743 (14) over (0.38%) 1,225 
Payments to Other Bodies 7,330 7,459 (129) over (1.76%) 2,793 
Payments to Contractors 15,551 19,222 (3,671) over (23.61%) 6,750 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 155 160 (5) over (3.23%) 0 
Total Controllable Exp. 117,962 118,419 (457) over (0.39%) 41,738 
Total Controllable Inc. (98,723) (99,180) 457 Over
recovered (0.46%) (34,328) 
Net Controllable Exp. 19,239 19,239 0 - 0.00% 7,410 
Variance Explanations 
Variances are shown in Appendices C and D. 
Budget Virements 
Virements are shown in Appendix C and D. 
26

Page 27

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 08 August 2025 (No.5) 
Housing Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 3,597 3,607 (10) Over (0.28%) 1,259 a, b
Property Costs 7,880 7,961 (81) Over (1.03%) 4,192 1, b, d
Supplies & Services 133 125 8 Under 6.02% 50 b
Transport & Plant 110 112 (2) Over (1.82%) 18 b
Administration Costs 150 148 2 Under 1.33% 37 b
Payments to Other Bodies 4,677 4,698 (21) Over (0.45%) 1,618 b, c
Payments to Contractors 2,610 2,611 (1) Over (0.04%) 497 c
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 11 13 (2) Over (18.18%) 0 
Total Controllable Exp. 19,168 19,275 (107) Over (0.56%) 7,671 
Total Controllable Inc. (10,201) (10,272) 71 Over
Recovered (0.70%) (3,175) 2, b
Net Controllable Exp. 8,967 9,003 (36) Over (0.40%) 4,496 
Variance Explanations 
1. The overspend relates to additional costs of accommodation and bed and breakfast expenditure in the homelessness budget where expenditure varies
according to service requirements.  This is offset in part by the over recovery of income (see 2. below).
2. The over recovery of income offsets the additional property costs (see 1. above) and relates to income recovery for homelessness services. 
Budget Virements 
a. Transfer from corporate items for pay award and the increase in employer national insurance rates 2025/2026.  Net effect £0.163m: Employees £0.163m
b. Establishment of the Ukraine refugee budget for 2025/2026.  Net Effect £0m: Employee Costs £0.560m, Property Costs £0.905m, Supplies & Services
£0.051m, Transport & Plant £0.013m, Administration Costs £0.008m, Payments to Other Bodies £1.289m and Income (£2.826m).
c. Transfer of Living Wage funding from Social Work Resources. Net Effect £0.097m: Payments to Other Bodies £0.013m and Payments to Contractors
£0.084m.
d. Redetermination of General Revenue Grant in respect of Ukraine Resettlement Funding.  Net Effect £0.123m:  Property Costs £0.123m. 
27

Page 28

Appendix D 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 08 August 2025 (No.5)  
Property Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 44,683 42,508 2,175 Under 4.87% 14,104 1, a
Property Costs 16,963 17,289 (326) Over (1.92%) 5,660 2
Supplies & Services 13,354 12,001 1,353 Under 10.13% 4,.369  3
Transport & Plant 4,477 4,232 245 Under 5.47% 1,418 4
Administration Costs 3,579 3,595 (16) Over (0.45%) 1,188 
Payments to Other Bodies 2,653 2,761 (108) Over (4.07%) 1,175 b
Payments to Contractors 12,941 16,611 (3,670) Over (28.36%) 6,253 5, c
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 144 147 (3) Over (2.08%) 0 
Total Controllable Exp. 98,794 99,144 (350) Over (0.35%) 34,067 
Total Controllable Inc. (88,522) (88,908) 386 under
recovered 0.44% (31,153) 6, a, c
Net Controllable Exp. 10,272 10,236 36 Under 0.35% 2,914 
Variance Explanations 
1. The underspend relates to turnover and vacancies mainly in Building Services and Estates services which are being actively recruited as required.
2. The overspend relates to greater than forecast expenditure on Facilities Management and utility charges within Office Accommodation and Estates and
IT security costs within CCTV service. 
3. The underspend mainly relates to lower than anticipated expenditure on materials within Building Services due to the timing of capital and revenue
works.
4. The level of expenditure on plant and other transportation costs within Building Services varies depending on workload demands and timing of works on
capital and revenue works.
5. The overspend reflects workload demands and timing of works by Building Services, which is dependent on the level of capital and revenue works.  
6. The over recovery of income is due to the recharge of the net additional spend incurred by Building Services, reflecting the level and type of revenue and
capital works undertaken this financial year.  Greater than forecast income within Office Accommodation is also anticipated.  These are partially offset by
lower than anticipated rental income within the Estates service. 
Budget Virements 
a. Incorporation of pay award and increase in employer national insurance rates. Net effect £1.350m: Employees £2.657m, Income (£1.307m)
b. Transfer from CFCR in respect of Private Sector Housing Scheme of Assistance. Net Effect £1.000m: Payment to Other Bodies £1.000m.
c.  Realignment of budgets to reflect spend within Property Maintenance.  Net effect £0.000m.  Payment to Contractor £3.000m, Income (£3.000m). 
28

Page 29

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources - Revenue Budget
Monitoring 2025/2026- Housing Revenue Account
(HRA) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2025 to 8 August 2025 for Housing and Technical
Resources (HRA)
 provide a forecast for the year to 31 March 2026
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the forecast breakeven position on Housing and Technical Resources’
(HRA) revenue budget, as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the second revenue budget monitoring report presented to the Housing and
Technical Resources Committee for the financial year 2025/2026. 
3.2. This report reflects the actual spend to 8 August 2025 within the Resource budget
and reflects the expected outturn forecast on expenditure and income at this date.     
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 8 August 2025, there is a forecast breakeven position against the budget. This
is outlined in Appendix A. 
5.2. Appendix A also notes the actual position as at 8 August 2025, being a net income
position of £6.391 million.  This reflects the timing of income and expenditure at that
point in the year.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report.  
5
29

Page 30

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk is managed through four weekly Budget Monitoring Meetings at
which any variance is analysed.  In addition, the move to routine forecasting and the
work within the Resource and Finance teams, ensures early warning for corrective
action to be taken where appropriate. 
7.2. Inflationary and budget pressures increase the risk of overspend however these
pressures are assessed and managed within the budget planning exercise for
current and future years. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
8 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kathleen Gowrie, Finance Manager
Ext:  2680 (Tel:  01698 452601)
E-mail :  Kathleen.Gowrie@southlanarkshire.gov.uk
30

Page 31

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Housing and Technical Resources Committee: Period Ended 08 August 2025 (No.5) 
Housing Revenue Account 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 15,360 15,171 189 Under 1.23% 5,220 1, a, b, c
Property Costs 59,585 59,597 (12) Over (0.02%) 16,339 c
Supplies & Services 2,369 2,382 (13) Over (0.55%) 199 
Transport & Plant 195 195 0 - 0.00% 35 
Administration Costs 5,594 5,649 (55) Over (0.98%) 213 
Payments to Other Bodies 3,271 3,323 (52) Over (1.59%) 849 
Payments to Contractors 100 100 0 - 0.00% 54 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 34,875 34,875 0 - 0.00% 10,246 
Total Controllable Exp. 121,349 121,292 57 Under 0.05% 33,155 
Total Controllable Inc. (133,968) (133,968) 0 - 0.00% (39,546) a, b, c
Transfer to/(from) Balance
Sheet (4,001) (3,944) (57) Over 1.42% 0 
Net Controllable Exp. (16,620) (16,620) 0 - 0.00% (6,391) 
Loan Charges 16,620 16,620 0 - 0.00% 0 
Net Controllable Exp. / (Inc.) 0 0 0 - 0.00% (6,391) 
Variance Explanations 
1. The underspend in employee costs is due to vacancies within the service that continue to be actively recruited. 
Virements 
a. Realignment of budgets for additional cost of pay award.  Net effect £0.000m.  Employee Costs £0.375m, Income (£0.375m)
b. Realignment of budgets to reflect the budgeted establishment.  Net effect £0.000m.  Employee Costs £0.202m, Income (£0.202m)
c. Temporary realignment of budgets to reflect the closure of Lindsay House. Net effect £0.000m.  Employee Costs (£0.421m), Property
Costs (£0.109m), Income £0.530m 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources - Capital Budget
Monitoring 2025/2026 (excl. Housing Revenue Account
(HRA)) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (excl. HRA) for the period 1 April to 8 August 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation:-
[recs]
(1) that the Housing and Technical Resources’ capital programme of £5.514
million, and forecast expenditure of £5.514 million, be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2025/2026. Further reports will follow
throughout the year. 
3.2. The revised budget of £5.514 million for Housing and Technical Resources is based
on the overall Capital Programme for 2025/2026 (Executive Committee 25 June
2025) updated for adjustments approved by the Executive Committees on 27 August
2025 and 24 September 2025. 
3.3. The report details the financial position for Housing and Technical Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2025/2026 Budget   
As detailed in Section 3.2, the revised capital programme for Housing and Technical
Resources is £5.514 million.  This is after planned transfers to the Revenue Budget
for the Private Housing Scheme of Assistance project (£1.000 million) and Planned
Maintenance Programme (£4.300 million).  As reported to the Executive Committee
on 24 September 2025, this is to reflect Accounting Regulations as this spend
6
33

Page 34

cannot be classed as Capital and therefore, a total of £5.300 million is transferred to
the Revenue Budget along with the associated funding. 
5.2. 2025/2026 Forecast   
Appendix A shows a forecast for the financial year of £5.514 million. For information,
actual expenditure to 8 August 2025 is £0.808 million. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 25 June 2025
 Executive Committee, 27 August 2025
 Executive Committee, 24 September 2025 
List of Background Papers
▪ Financial ledger to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
34

Page 35

Appendix A
South Lanarkshire Council
Capital Expenditure 2024-25
Housing and Technical Resources Programme (excl HRA)
For Period 1 April – 8 August 2025 
Housing and Technical
Resources (excl HRA) Base Budget 
£000
Budget
Adjustments
£000
Slippag
e/
Acceler
ation
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000
Asset Management Programme 8,110 (4,300) - 3,802 3,802 - 530
Private Housing Scheme of
Assistance 1,000  (1,000) - - - - 0
Other Housing 1,018 686 - 1,712 1,712 - 278
TOTAL 10,128 (4,614) - 5,514 5,514 - 808 
For Information Only   
Budget Adjustments approved by Executive Committee, 
27 August 2025: 
Budget Adjustments approved by Executive Committee, 
24 September 2025: 
Budget Adjustments 
Net Zero Innovation Fund 
Total Budget Adjustments 
£0.150m 
£0.150m
Budget Adjustments 
Planned Asset Management Programme
Private Housing Scheme of Assistance (PHSA) 
Total Budget Adjustments   
(£4.300m)
(£1.000m) 
(£5.300m) 
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025 
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources – Capital Budget
Monitoring 2025/2026 (Housing Revenue Account) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Housing and
Technical Resources (HRA) for the period 1 April 2025 to 8 August 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Housing and Technical Resources’ (HRA) capital programme of
£87.700 million and forecast expenditure of £87.700 million be noted. 
3. Background
3.1. This is the second capital monitoring report presented to the Housing and Technical
Resources Committee for the financial year 2025/2026.   
3.2. The budget is based on the revised capital programme for the year, which was
approved by the Executive Committee on 27 August 2025.   
3.3. The report details the financial position for Housing and Technical Resources (HRA)
on Appendix A. 
4. Employee Implications
4.1. There are no employee implications contained within this report. 
5. Financial Implications
5.1. 2025/2026 Budget:  The revised Housing Capital Programme for 2025/2026 is
£87.700 million.  This included £0.160 million Scottish Government grant for the
Climate Emergency Fund which has been approved to spend on Council Houses.
The total budget along with the funding sources is detailed at Appendix A to this
report. 
5.2. 2025/2026 Forecast: Current estimates have identified an outturn of £87.700 million
for the year.  For information, actual expenditure to 8 August 2025 is £19.032 million.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.  
7
37

Page 38

7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.
The risk is mitigated through the detailed project management plans prepared and
monitored for each project.  The risk of overspend is managed through 4 weekly
Investment management meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
10 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kathleen Gowrie, Finance Manager (Resources)
Ext:  2601 (Tel:  01698 452601)
E-mail:  Kathleen.Gowrie@southlanarkshire.gov.uk  
38

Page 39

South Lanarkshire Council       Appendix A
Housing Capital Programme 2025/2026
As at 11 July 2025 
2025/26
Annual 
Budget  
2025/26
Forecast
Spend
2025/26
Forecast
Variance
2025/26 
Actual to
11/07/25 
£m £m £m £m
Expenditure 
2025/26 Budget  87.700  87.700  0.000  19.032     
2025/26
Annual 
Budget  
2025/26
Actual to
11/07/25 
£m   £m
Income         
Capital Receipts 0.000   0.000
Capital Funded from Current Revenue 35.633   10.246
Prudential Borrowing 26.948   3.963
Scottish Government Specific Grant:    
- New Build 18.839   3.628
- Open Market Purchase Scheme 6.000   1.068
- Mortgage to Rent
- Climate Emergency Fund
0.120
0.160  
0.000
0.000
Other Income 0.000   0.127 
87.700   19.032 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Housing and Technical Resources)  
Subject: Housing and Technical Resources – Workforce
Monitoring – 1 June to 31 July 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for 1 June to 31July 2025 relating to Housing
and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for 1 June to 31 July 2025 relating
to Housing and Technical Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 14 June 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee. This report for Housing and
Technical Resources provides information on the position for 1 June to 31 July 2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of July 2025 for Housing
and Technical Resources. 
The Resource absence figure for July was 5.7%, this figure has increased by 0.2%
when compared to last month and is 1.4% higher than the Council-wide figure. When
compared to July 2024, the Resource absence figure has decreased by 1.0%. 
Based on the absence figures at July 2025 and annual trends, the projected annual
average absence for the Resource for 2025/2026 is 6.3% compared to a Council-
wide average figure of 6.0%.
8
41

Page 42

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 109 referrals were made this period. This
represents a decrease of 6 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 4 accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 4 disciplinary hearings were held within the Resource, this figure
is unchanged when compared to the same period last year. No appeals were heard
by the Resource, which also remains unchanged when compared to the same period
last year. One grievance was raised within the Resource, this figure has increased
by 1 when compared to the same period last year. No Dignity at Work complaints
were raised within the Resource, this figure has remains unchanged when compared
to the same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were 5 leavers in the Resource this period eligible for an exit interview. The
number of leavers is unchanged when compared with last year. During the period 2
exit interviews were conducted, this figure has increased by 2 when compared to the
same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been a decrease of 6 employees in post from 8 March 2025 to 14 June
2025. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report.
42

Page 43

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
28 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving.
 Excellent employer
 Focused on people and their needs.
 Working with and respecting others. 
Previous References
 Housing and Technical Resources – 13 August 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext: (Tel: 01698 454647)
E-mail:  elaine.maxwell@southlanarkshire.gov.uk
43

Page 44

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.7 5.3 5.6 April 6.9 7.2 4.8 April 6.2 6.1 5.3 April 5.1 5.2 5.7
May 4.9 5.2 4.5 May 6.1 8.1 5.7 May 5.4 6.4 5.0 May 5.1 5.3 5.6
June 5.4 5.7 5.1 June 6.8 8.4 6.0 June 6.0 6.8 5.5 June 4.7 5.2 5.4
July 5.0 5.3 5.2 July 8.1 8.6 6.4 July 6.2 6.7 5.7 July 3.8 4.1 4.3
August 5.1 5.5 August 8.5 8.8 August 6.4 6.9 August 4.1 4.7
September 4.7 7.5 September 7.8 7.4 September 6.0 7.5 September 5.3 6.1
October 4.9 7.3 October 5.2 6.0 October 5.0 6.8 October 5.1 6.0
November 4.8 6.8 November 6.7 6.2 November 5.6 6.5 November 6.2 6.9
December 5.1 6.4 December 7.4 5.8 December 6.0 6.2 December 6.6 7.0
January 4.4 7.0 January 6.0 6.2 January 5.0 6.7 January 6.1 6.7
February 5.2 7.0 February 6.3 7.1 February 5.6 7.0 February 6.4 7.0
March 5.3 6.8 March 7.2 5.9 March 6.1 6.4 March 6.3 6.8
Annual Average 5.0 6.3 6.2 Annual Average 6.9 7.1 6.4 Annual Average 5.8 6.7 6.3 Annual Average 5.4 5.9 6.0
Average Apr-Jul 5.3 5.4 5.1 Average Apr-Jul 7.0 8.1 5.7 Average Apr-Jul 6.0 6.5 5.4 Average Apr-Jul 4.7 5.0 5.3
862 531 1393 15573No of Employees at 31 July 2025No of Employees at 31 July 2025 No of Employees at 31 July 2025 No of Employees at 31 July 2025
Appendix 1
Housing & Technical Resources
Resource Total
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
APT&C Manual Workers Council Wide
44

Page 45

Jun - Jul Jun - Jul
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 37 35
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 115 109
Jun - Jul Jun - Jul
2024 2025
Over 7 day absences 1 1
Minor 6 2
Violent Incident:  Verbal***** 0 1
Total Accidents/Incidents 7 4
Jun - Jul Jun - Jul
2024 2025
Total Number of Hearings 4 4
Time Taken to Convene Hearing - Jun to Jul 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
2 0 2
Jun - Jul Jun - Jul
2024 2025
Number of Grievances 0 1
Still in Progress 0 1
Jun - Jul Jun - Jul
2024 2025
Number of Incidents 0 0
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
HOUSING AND TECHNICAL RESOURCES
42 36
0 3
36 35
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
RECORD OF DIGNITY AT WORK
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
45

Page 46

Jun - Jul Jun - Jul
2024 2025
Career Advancement 0 1
Disatisfaction with terms and conditions 0 1
Personal Reasons 0 2
Other 5 1
Total Number of Leavers Eligible for Exit Interview 5 5
Number of Exit Interviews conducted 0 2
Percentage of interviews conducted 0% 40%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
HOUSING AND TECHNICAL RESOURCES
46

Page 47

As at 14 June 2025
Total Number of Employees
F/T P/T F/T P/T
751 113 344 159
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
4.00 195.51 668.67 350.04 33.29 7.00 0.00 2.00 0.00 1260.51
As at 8 March 2025
Total Number of Employees
F/T P/T F/T P/T
760 115 337 161
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 188.00 676.43 354.95 32.89 9.00 0.00 2.00 0.00 1266.27
MALE FEMALE TOTAL
TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
Salary Bands
Appendix 3
JOINT STAFFING WATCH RETURN
HOUSING & TECHNICAL RESOURCES
1367
1373
*Full - Time Equivalent No of Employees
MALE FEMALE
47

Page 48

48

Page 49

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director, Housing and Technical Resources  
Subject: Housing and Technical Resources' Workforce Plan 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Housing and Technical Workforce Plan 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the work to produce the Housing and Technical Resources’ Workforce
plan be noted; and
(2) that the Housing and Technical Resources’ Workforce Plan, attached at
Appendix 1, be approved.   
3. Background
3.1. South Lanarkshire Council is committed to delivering high-quality services that
improve the lives of residents across the region. The Council Plan 2022 to 2027
outlines strategic priorities under the themes of People, Planet, and Progress. To
support these priorities, the Council has developed a Workforce Strategy that
ensures the right people are in the right roles at the right time.
3.2. The Council Workforce Strategy and Planning process provides the framework for
workforce planning in the Council. The Strategy and Plans are aligned to current and
future Council service needs and details the approach by the Council to ensure that
the workforce required is in place to meet those needs. The Council Workforce
Strategy and Plan was approved at Executive Committee, 28 May 2025.
3.3. Resource workforce plans detail the key areas of focus for Resources for 2025 to
2027, the current resource workforce profiles, the key workforce challenges and
actions identified to address challenges. 
4. Workforce Planning Process
4.1. Engagement and consultation to produce workforce plans has been primarily
through HR business managers and Resource Management Teams. Resources
undertook a horizon scanning exercise as part of the Resource planning process to
identify key areas of focus, this along with workforce data was used to complete
workforce planning toolkit templates. In addition, there was review of previous
actions (2022 to 2025) to identify any ongoing activity to be reflected in the 2025 to
2027 plans. This structured approach enabled the identification of strategic workforce
priorities and the development of targeted actions to address them.  
9
49

Page 50

5. Housing and Technical Resources Workforce Plan 2025 to 2027.
5.1. The Housing and Technical Resource Workforce Plan is attached in Appendix 1. The
workforce planning process identified 5 key priority areas, each with associated
challenges and actions detailed in paragraphs 5.2. to 5.6. 
5.2. Recruitment, Attraction, and Retention
The challenges identified were the recruitment and retention of housing staff in a
competitive recruitment market and the staff demographic. To address this, the
Resource will continue to use a ‘grow your own approach’ to develop employees and
further develop career pathways within Housing.  This approach will include
succession planning to develop future leaders, continuation of Modern Apprentice
programme to provide a talent pool of qualified employees, as well as promotion of
the Council as an employer of choice. 
5.3. Transformation
Across the Resource there are reviews within Property Services and the
implementation of the integrated IT system. This will have staffing implications in
relation to workload and how this is organised across the Resource. The employee
impact will be reviewed, as the outcomes of are identified and the new IT system is
embedded. 
5.4. Skills Gap
The workforce planning process has identified skills gaps in green skills to enable the
achievement of net zero and digital skills. Training requirements will be identified and
progressed through the Learning and Development Board to ensure skilled staff are
able to deliver the key Resource activities. 
5.5. Delivery of Key Activities
To deliver the key areas of activity for the Resource, there are challenges relating to
increased workload due to the homelessness crisis and asylum activity. There is also
increased work within building services as more work in carried out in house. The
increased staffing requirements will be met by developing existing staff, reallocating
workload and recruiting additional staff where required. 
5.6. Employee Wellbeing
There are challenges across services in terms of absence management, staff
resilience and employee engagement. Personnel Services are recruiting additional
resources to support managers in maximising attendance. The service will also
continue to review and improve supports to enhance employee wellbeing and
engage with Trade unions in line with Partnership Working arrangements.   
6.  Monitoring Arrangements
6.1. Plans will be monitored through Resource Management teams and updates provided
to the Committee on an annual basis. 
6.2. Workforce planning is incorporated into Resource risk registers to acknowledge that
having the right workforce with the right skills at the right time is reliant on the key
workforce actions progressing. There are some workforce actions addressing national
challenges, for example, national campaigns to promote career pathways in local
government and funding available for specific training opportunities to address skills
shortages. There is a risk if these actions do not progress that there will be shortfalls
in the workforce that can impact on service delivery. 
50

Page 51

7. Employee Implications
7.1. Having a Workforce Strategy and proactive workforce planning process in place
ensures an effective workforce is in place to deliver Council services. 
8. Financial Implications
8.1. There are no costs associated with undertaking the workforce planning process. 
8.2. Planning for appropriate workforce arrangements demonstrates effective and
efficient use of resources. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or for the environment on
this report. 
10. Other Implications
10.1. There are risks to the Council in not ensuring that there are clear links between the
workforce planning process and the overall Council planning process. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy or strategy, and no impact assessments
are required. An integrated impact assessment was undertaken for the Workforce
Strategy. 
11.2. Trade Unions been involved in the workforce planning process and updated through
updates to JTUC Executive. Resource workforce planning activity is reported through
JCCs. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
5 September 2025 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open, and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve. 
Outcomes
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 Inspiring learners, transforming learning, strengthening partnerships 
51

Page 52

Previous References
 None 
List of Background Papers
 Council Workforce Strategy and Plan 2025 to 2027, Executive Committee 28 May 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Eileen McPake, HR Business Manager
Ext:  4668  (Tel:  01698 454668)
E-mail:  eileen.mcpake@southlanarkshire.gov.uk 
52

Page 53

1
Housing and Technical Workforce Plan 2025 – 27 
Appendix 1 
9
53

Page 54

2
Housing and Technical Workforce Plan 2025 – 27 
Housing and Technical Resources
Workforce Plan 2025 – 27 
1. Introduction
2. Resource Overview
3. Key Resource Activity
4. Resource Workforce Profile
5. Resource Workforce Plan 
6. Risk Implications
7. Monitoring the Plan
Appendix 1 – Review of 2022-25 Actions
Appendix 2 – Housing and Technical Workforce Profile 
Appendix 3 – 2025 – 27 Housing and Technical Workforce Planning Actions 
54

Page 55

3
Housing and Technical Workforce Plan 2025 – 27 
1. Introduction
South Lanarkshire Council delivers a wide range of services across the community that improve the
lives of everyone living in South Lanarkshire. At the heart of the Council vision are values based on
fairness, empathy, and a commitment to make a difference for the people of South Lanarkshire. The
Council strives to be high achieving and high performing and to achieve this requires an available,
capable, and resilient workforce.
The Council Plan 2022 – 2027 sets out the Council priorities and how these will be delivered. The
foundations of the Council plan are based on People, Planet and Progress. 
To deliver the Council priorities the Council has a Workforce Strategy which sets out the workforce
planning framework used to identify the key strategic drivers, service demands and the actions to
ensure that the Council has the right people in the right place at the right time to deliver our vision.
This framework has been used to produce Resource and Council workforce plans, which outline the
workforce challenges and actions for South Lanarkshire Council. (See section 5 for detail of the
Resource Workforce Plan).
The previous workforce plans covered 2022 – 2025 and this Council Workforce Plan covers the
period 2025 – 27, to align with the lifecycle of the current Council Plan.
2. Resource overview
There are two Services within Housing and Technical Resources which help to ensure that the council
operates successfully in an increasingly complex and challenging environment, and although diverse,
each service is essential to the running of the council and the delivery of its vision, values and
priorities.
Housing Services is the fourth largest social landlord in Scotland and is responsible for providing a
comprehensive housing management service, managing 25,923 homes, including 34 Sheltered
Housing developments and two sites for the Gypsy / Traveller community. Housing Services is divided
into three distinct, yet interrelated service areas of Homelessness and housing support; Housing
Management Services and Housing Strategy and Support. We provide homelessness and housing
support services, working to prevent and alleviate homelessness; support independent living; improve
levels of tenancy sustainment and support vulnerable households in our communities, including
refugees. Housing Management Services includes a range of activities such as, allocating housing,
managing tenancies and rent management. At a strategic level, we have responsibility for the
development and implementation of the Strategic Housing Investment Plan (SHIP) and the Local
Housing Strategy. The Service also provides both strategic and support functions across the
Resource, contributing to the council and national agenda, including anti-social behavior, tackling
poverty, affordable warmth and the development and delivery of additional affordable homes. 
Property Services is responsible for ensuring that the council’s property portfolios, including housing
and land, contribute effectively to service delivery by being fit for purpose, suitable, sustainable and
efficient. The Service is split between three service areas, Building Services, Assets and Estates and
Consultancy Services. These services have a wide range of responsibilities including working with
all other Resources to develop, design, procure and, in many cases deliver property
construction/improvement projects. The Service undertakes maintenance works across the property
portfolio, including the out of hours repairs service and carries out legislative compliance works
including electrical testing and gas safety checks. The Service also manages properties for sale and
lease and undertakes acquisitions and valuations. 
55

Page 56

4
Housing and Technical Workforce Plan 2025 – 27 
3. Key Resource Activity
Overview
The Resource has identified the main challenges, risks and new developments which will have
significant impact on the delivery of services in the coming year. These are outlined briefly below.
Cost of living crisis 
The UK is still experiencing the impact of the worst cost-of-living crisis in 40 years. While all sectors
of society are seeing prices rise the impacts are greatest for those on the lowest incomes. The council
recognises the immense pressures being faced by households across South Lanarkshire and
acknowledges the additional demands on council services as a result. The council has in place a
range of support which can help households manage scarce resources and services will continue, in
the year ahead, to explore all avenues to support the most vulnerable. While doing all we can to
support our communities in these difficult times, the council recognises that inflationary pressures will
also present significant challenges for council services as budgets are increasingly squeezed by rising
costs. 
Housing to 2040
Published in 2021, the Scottish Government’s Housing to 2040 publication identifies significant policy
changes planned for the housing sector over the next 20 years. This includes a target of delivering
110,000 additional affordable homes across Scotland, the introduction of a Rented Sector Strategy,
including proposals to introduce new legislation aimed at aligning standards within both the private
and social rented sectors, new housing quality standards, an emphasis on place-based strategy and
accelerated energy efficiency targets. The Resource will continue to monitor progress in relation to all
aspects of this document, working with housing, health and homelessness partners across South 
Lanarkshire to meet any new requirements. 
In the year ahead, major aspects of the Housing to 2040 programme will be progressed through the
implementation of a new Housing Bill, including reform of the private rented sector tenants ,the
introduction of new homelessness prevention requirements and the establishment of the new
accessible homes standard with phased implementation between 2025 and 2030. 
Financial considerations
In order to continue to maintain, invest and meet legislative requirements for council housing and
services, maximising rental income and minimising arrears will continue to be a priority for the
Resource. However, we recognise that the socio-economic context is continuing to have an adverse
impact on the financial capacity and security of our tenants and other customers. It is therefore our
intention to continue to set affordable rents and provide a person-centred approach to supporting our
tenants and customers who face financial difficulties, while contributing to the wider tackling poverty
agenda. During 2025/26 the number of tenants moving onto Universal Credit will significantly increase
through the ‘managed migration’ process and the Resource will continue to monitor the impact upon
tenants and rent arrears. The scale and nature of investment in the council’s property assets is
changing as a result of restricted budgets, new technology and the requirements in relation to
achieving net zero. The Resource will review operational models to ensure that property services
continue to be delivered effectively and staff are upskilled. 
Severe pressure on homelessness services 
A key priority for the Resource is addressing homelessness as identified in the Local Housing Strategy
and the South Lanarkshire affordable housing supply programme. The Resource continues to work
closely with our partners to address emerging issues and the priorities identified in the South
Lanarkshire Homelessness Strategic Plan, including preventing homelessness occurring and
56

Page 57

5
Housing and Technical Workforce Plan 2025 – 27 
reducing the time spent by households in temporary accommodation and minimise moves before
moving to a settled home. 
The introduction of the Housing Bill in relation to homelessness prevention duty will require landlords
to take specific actions to reduce the risk of homelessness. 
Homelessness has increased at an unprecedented level over the last three years resulting in the
considerable pressure to meet the needs of households most in need. This cumulated in the council’s
decision to declare a housing emergency. To address the continuing emergency conditions the
Resource is progressing a range of actions to help mitigate the impact of the increase and continues
to explore options to alleviate the pressure. 
Continuing to improve the supply and availability of housing
The Resource will continue to deliver on its Home+ programme to increase the supply of council
homes through the building of new homes and purchasing existing homes from the market. 
In November 2022, the Executive committee set a new target to deliver 1,300 additional council
homes by March 2027. Initial progress has been made towards this, however as part of the Strategic
Housing Investment Plan 2025-30 approval process at Housing and Technical Resources Committee
on 27 November 2024,  the council acknowledged that as a result of grant funding reductions in
2023/24, uncertainty around future funding and challenges in progressing key new-build sites, it is no
longer on track to meet this target. Work does however continue to maximise the available funding
and achieve as many additional homes as possible across all areas of South Lanarkshire by 2027. 
In addition to new sites across Hamilton, East Kilbride, Strathaven, Cambuslang and Lesmahagow,
consideration is also being given to new the role of affordable housing within wider town centre
regeneration in Hamilton and East Kilbride. The Market Purchase Scheme also continues to be used
as an affordable and effective method to supplement new build projects, allowing the acquisition of
particular house types in areas of increasing need. The Resource will also continue to meet housing
needs by letting houses efficiently, effectively and fairly, by working with Registered Social Landlord
partners.
Provision of services to Gypsy/Travellers
The Resource currently operates two Gypsy/Traveller sites comprising a total of 24 pitches. The
Resource will continue to work closely with residents to deliver an accommodation need and demand
assessment and continue to implement a co-produced investment masterplan for both sites which
includes a range of investment activities including; pitch expansions, upgrades to amenity buildings
and continuing to implement measures to support fire safety on sites.
In addition, the Resource will continue to work with the Scottish Government and COSLA to deliver
appropriate outcomes from the national ‘Improving the Lives for Gypsy/Travellers Action Plan.’ 
Health and social care 
The Resource supported the development of the Strategic Commissioning Plan 2025-28 which was
approved in March 2025 and will continue to ensure effective alignment with strategic planning for
housing and homelessness through the Local Housing Strategy and associated Strategic Housing
Investment Plan. 
The council’s ‘Progressive Housing’ Framework was approved in June 2024 and includes
arrangements to ensure appropriate consideration is given to identified sites within the council’s
Home+ Programme to incorporate a required number and mix of specialist homes. Early engagement
with local housing, health and planning teams from across each of South Lanarkshire’s four localities
enables new council housing provision to be designed to meet the known needs of those who may
be allocated one of the new homes.
57

Page 58

6
Housing and Technical Workforce Plan 2025 – 27 
Development of integrated housing and property management system
The implementation of the new system represents a significant undertaking for the Resource. This
Plan has been developed to take account of the potential impacts of the implementation on service
delivery and performance.  
Health and safety 
Ensuring effective implementation of statutory and regulatory Health and Safety legislation
requirements will remain a key focus for the Resource to maximise efforts to reduce accidents and
comply with all current and emerging health and safety legislation for council buildings and housing,
developing and promoting a safe environment for employees, tenants and customers. 
Sustainable development and climate change
The council acknowledges the serious and immediate threat of climate change and is committed to
accelerating the pace of action in response to the climate emergency and in Scotland’s transition to
a net-zero and climate resilient society and economy.
To the full extent that resources permit, the Resource will continue to manage the property and land
assets as well as the commercial portfolio of the council, ensuring it continues to meet requirements
in terms of scale, location, condition, suitability and corporate image. 
The 2025/26 Housing Capital Programme reflects the level of investment required to continue to
maintain the Scottish Housing Quality Standard. Whilst the Scottish Government are currently
reviewing the energy efficiency standards for social housing, the council will however continue to
invest in energy efficiency measures to improve thermal performance in tenants’ homes and install
zero direct emissions heating systems where appropriate.
The Scottish Government’s New Build Heat Standard was implemented in 2024 with significant
planning underway to meet this new requirement alongside improving the councils existing housing
stock, with a focus for both of these on ensuring a just transition for tenants is achieved.
The council also continues to support privately owned or rented homes in meeting new energy
efficiency or decarbonisation targets through the delivery of a new Energy Company Obligation
Scheme (ECO).
Refugee re-settlement programme and asylum dispersal 
The Resource will continue to manage and support the refugee resettlement programmes for families
who arrive in South Lanarkshire through the following visa schemes: the UK Resettlement Scheme,
the Afghanistan Relocation and Assistance Policy, the Afghan Resettlement Programme and the
Homes for Ukraine scheme. The council will monitor closely the impact of the assessment routes
which has been established by the Home Office and other developments in national asylum and
refugee policy which could significantly impact upon the demand for accommodation and support
services within South Lanarkshire. The Resource will work in partnership with relevant agencies to
support new arrivals and ensure that families move to settled accommodation as quickly as possible. 
The Resource will also coordinate council and partner involvement in the asylum seeker dispersal
programme.
4. Housing and Technical Workforce Profile
The full workforce profile is attached in Appendix 3. The data reviewed covers the period April 2023
– March 2024. Resources used this data to complete their workforce plans for 2025 – 27. 
The key highlights from the workforce profile are detailed below.
Employee Numbers
For April 2023 – March 2024, Housing and Technical Resources employed an average of 1445
employees, equating to 1341 Full Time Equivalent (FTE). 
58

Page 59

7
Housing and Technical Workforce Plan 2025 – 27 
The workforce is split across two services, Housing and Property; the split of each Service is shown
below in Table 1 by headcount (number of employees) and total FTE.
Please note the Directorate is not a separate service
Table 1 Employee numbers
Housing and Technical Headcount FTE
Housing and Technical 1445 1341
Directorate 3 3
Housing 494 441
Property 948 897 
Employment Status 
As of 31 March 2024, HTR employed 1443 employees. There are 79 employees who are in a
temporary position, 1362 employees in a permanent position and 1 casual employee. This is detailed
in table 2.
The majority of the Service’s workforce is employed on a full-time basis; the highest proportion of part
time employees is within Housing Services. 
Table 2 Employment Status
Service Permanent
Employees
Temporary
Employees
Casual
Employees
Total
Employees
Housing and Technical 1362 79 1 1442
Directorate 3 - - 3
Housing 475 17 - 492
Property 884 62 1 947 
Gender Split
The gender split across Services* is detailed in Table 3. The Resource workforce consists of 64.7%
male and 35.3% female.
Table 3 Gender Split
Service Female Male Total Employees
Housing and Technical 508 933 1441
Directorate 2 1 3
Housing 381 111 492
Property 125 821 946 
*As at 31 March 2024 and excluding casual employees
Age Range
The age range across Services* is detailed in Table 4. Sixty-six percent of the workforce are age 40
or over. Property has the highest employee numbers aged 65 and above, as well as the highest
59

Page 60

8
Housing and Technical Workforce Plan 2025 – 27 
number of employees aged 50 and above. Property also has the highest number of employees aged
16-19 years. 
Table 4 Age Range
Service 16-19
Years
20-29
Years
30-39
Years
40-49
Years
50-59
Years
60-64
Years
65+
Years
No.
Employees
Housing and
Technical 17 200 276 273 402 186 87 1441
Directorate - - - 1 - 2 - 3
Housing 5 55 79 112 146 66 29 492
Property 12 145 197 160 256 118 58 946 
* As at 31 March 2024, excluding casual employees.
Absence
The absence rate for the Resource for 2023/24 was 5.79%. The details are in table 5. 
Table 5 – Absence rates
Service Absence 23 /24
Housing and Technical 5.79%
Directorate 3.14%
Housing 6.02%
Property 5.68% 
Leavers and Turnover
From 1st April 2023 to 31st March 2024, 115 employees left the Resource, equating to 92.10 FTE. The
turnover rate for the Resource for 2023/24 was 7.96%, this turnover rate is calculated using all
leavers. 
Recruitment
During 2023/24 171 posts were advertised attracting 2441 applications. Candidates were appointed
to 186 posts
Full details of the workforce profile are attached in Appendix 1.
60

Page 61

9 
5. Resource Workforce Plan
Resource Workforce plans were produced covering the period 2022 – 25. These plans have been reviewed to
provide an update on actions to date and to identify any ongoing activity to be reflected in the 2025 – 27 plans.
A summary of the review is included in Appendix 1.
During 2024, Resources undertook a horizon scanning exercise as part of the Resource planning process to
identify key areas of focus moving forward. Following this, working with HR Business Managers, Heads of
Service completed the workforce planning toolkits to consider the workforce requirements to deliver resource
plan outcomes, local and national drivers, as well as known and anticipated changes that will impact on the
workforce. The workforce profile information was also taken into account as part of this exercise. 
Common theme emerged across all Resource and the priority workforce planning areas for actions are as
follows:
• Recruitment / Attraction and / retention
• Transformation
• Skills gap
• Delivery of key activities
• Employee well being 
All of this activity identified the key workforce challenges and the actions for Housing and Technical Resources,
a summary is provided in the table below. 
Summary of challenges and actions
Priority Identified Need  Key Challenges Action
Recruitment / Attraction /
Retention
Recruitment challenges
as other provider has
more generous reward
packages. 
Age profile of existing
staff 
Loss of skills and
experience 
Promote the Council as
Excellent Employer 
Promote further the
Chartered Institute of
Housing professional
standards 
Continue to expand use
of ‘grow your own’
approach. 
Implement robust
succession planning. 
Transformation Budget gap and
maintaining service
delivery 
Implementation of
integrated housing
management system 
Property Services Review
Manage employee impact
of efficiency, engage
employees and Trade
Unions 
Manage employee impact
as HOME system is
implemented  
Manage employee impact
of review outcomes
61

Page 62

10 
Support transformation
and review outcomes 
Delivery of Key Resource
Activities
Homelessness
emergency 
Continuing legislative
requirements around
MAPPA and supporting
asylum 
Implementation of
integrated housing
management system 
Review support required
with respect to ongoing
homelessness crisis and
related workload 
Assess implications for
MAPPA and asylum and
increased workload 
Support employees
through implementation
and assess employee
implications of HOME
project - implementation
Employee Well being Maintaining employee
wellbeing and resilience
Reducing absence
Improved employee
engagement 
Adopt Trauma informed
practice approach to
service delivery 
Provision of employee
supports
Additional resources to
support absence
management 
Provide training to enable
employees recognise the
impact of trauma and
impact on service user 
The Housing and Technical Workforce Action Plan is attached in Appendix 3. 
This provides the detail on the actions to deliver the plan, how they will be achieved, who is responsible for the
delivery, the expected outcomes, and the timescales to be achieved by. 
Engagement and consultation to produce workforce plans has been primarily through HR Business Managers
and Resource Management Teams,
Trade Unions have been updated on activity through JTUC Executive updates and Trade Unions were also
asked to provide details of workforce challenges from TU perspective via a survey. 
6. Risk Implications
The actions identified to assist the Council to achieve the right people with the right skills to deliver services.
However, there are risks if these actions cannot be delivered. These are:
• Reduced workforce supply is a risk to meeting the Councils requirements 
• Ability to train and develop staff to create our own talent into specialist roles within required timescales
and maintain service delivery 
• Competing recruitment drives across services and sectors 
The risks identified with workforce planning will be included in the Resource risk registers. 
7. Monitoring the Plan
The action plan will be monitored through Resource Management Teams. As the 
arrangements on national initiatives emerge any significant changes will be reflected in 
62

Page 63

11 
updated action plans. Resource workforce plans will be formally reported through annual 
updates on actions to Resource Committees. The Council workforce plan will be reported to 
Executive Committee on an annual basis. 
Appendix 1 Review Workforce Plan Actions 2022 – 25
An update on the key actions from the 2022 – 25 plan is provided below: 
Priority / identified
need
Actions Achievements Next steps
1a Increased demand and
reduced workforce pool 
Revised
recruitment
practices, utilise
employability
routes. 
Revised
recruitment
practices are now
embedded, use of
social media,
employability, and
promotion of career
pathways. This is
evidence by
continued support
for the Council
Modern Apprentice
program, links to
employability
programs. 
Successful
recruitment
campaigns and the
use of a
recruitment pool for
Housing Assistants 
This will be
addressed
through further
review and
revisions to the
Recruitment
Strategy and
the 
Learning and
Development
Strategy 
1b  Succession
Planning
Succession
planning is
discussed as part
of appraisal
process and
potential leaders
are nominated to
join the Leadership
Development
program, there are
currently 18
delegates enrolled
from HAT.
This will be
addressed
through further
revisions to the
Recruitment
Strategy and
the 
Learning and
Development
Strategy 
2a Service Design and
Efficiency savings 
Managing
employee impact
of savings 
Phase 1 Property
Services review
restructure 
The revision of
SWITCH2
arrangements
in relation to
managing
employee
impact of
savings activity
will ensure that
employee skills
are maximised. 
63

Page 64

12 
2b  Service Redesign The Council has a
program of
transformational
reviews to enable
services to be
delivered in a
different way to
achieve
efficiencies.
The
transformational
review
programme is
ongoing and
current reviews
are within
services areas,
as well as
reviews of
overtime
reduction and
organisational
structures. 
2c  Service Review of
Integrated Housing
Options Service
This is underway
and will link to the
local housing
emergency
The employee
impacts will be
assed once the
review is
complete
3a IT / Digital  Implementation of
Fusion (HR,
finance, and
procurement) 
The new system
was implemented
in August 2024 and
processes have
been improved to
reflect the
capability of the
new system. 
The workforce
planning
process has
matured to
provide a
specific focus to
consider the
workforce
supports for the
delivery of a
Digital Council 
3b  Implementation of
HOME
The
implementation of
HOME has been
delayed and
employee resource
to support this has
remained in place
Implementation
of HOME will
require to be
supported
through
training,
technical and
change
management
resource. 
The will be
improvements
in terms of
service
redesign and
workflow
improvements
across Housing
and Property
Services
4 Employee support and
wellbeing
Enhance
employee support
Revised
occupational health
provision has
enhanced the
support available to
employees
Employee
supports will
continue to be
reviewed to
ensure the
supports are
64

Page 65

13 
Housing Services
have an internal
employee well
being group. 
accessible to all
employees. 
There is a
review of
Maximising
Attendance
Policy and
supporting
procedures to
ensure that the
Council
continues to
develop good
practice to
support and
engage the
workforce 
65

Page 66

14 
Workforce Profile: Housing and Technical Resources          Appendix 2 
Section 1: Headcount and Full Time Equivalent
For the year 2023/24, South Lanarkshire Council (SLC) employed an average of 17,086 employees, equating to 14,046 Full Time Equivalent (FTE).
Housing and Technical Resources employs 1445 employees at 1341 FTE, accounting for 10% of the Council’s headcount. The headcount and FTE for each Service is
shown in Table 1. 
Table 1 – SLC Headcount and FTE
Headcount - 1445 FTE - 1341   
Directorate
2.92
0% Housing
493.92
34%
Property
947.67
66%
Directorate
3.00
0% Housing
440.56
33%
Property
897.00
67%
66

Page 67

15 
Section 2: Employment Categories and Hours Worked
As at 31st March 2024, Housing and Technical employed 1443 employees, with a combined total of 1468 assignments. 1 employee was categorised as Casual. 
Table 2: Employment Category Split 
Resource Permanent
Employees
Temporary
Employees
Casual
Employees
Total
Employees
SLC 15377 594 769 16740  
Housing and Technical 1362 79 1 1442    
Directorate 3 - - 3    
Housing Services 475 17 - 492    
Property Services 884 62 1 947 
*Please note that for all further data sets, Casual Employee figures have been removed. The total number of employees employed by SLC as at 31st March
2024 is therefore 15,971 and Housing and Technical, 1441. 
The majority of the Council’s workforce is employed on Full Time contracts, which for the purposes of this report, has been taken to mean employees working 35
hours or greater per week at a Full Time Equivalent greater than or equal to 0.90. Term – Time employees who meet this criteria over 39 weeks have also been included
in the Full – Time count.
As shown below, 56% of SLC’s workforce were employed Full Time, with the remaining 44% categorised as Part Time employees as of 31st March 2024:
Permanent
94%
Temporary
6%
Casual
0%
67

Page 68

16
Table 3: Part Time / Full Time Split          Full Time Split as Percentage Full Time Split of Service
Resource Total
FT
Total
PT
No.
Employees
South Lanarkshire Council 9267 6704 15971  
Housing and Technical 1140 301 1441    
Directorate 3 - 3    
Housing Services 343 149 492    
Property Services 794 152 946 
Section 3: Leavers and Turnover
Leavers
From 1st April 2023 to 31st March 2024, 1709 employees left the council, equating to 1239.55 FTE. 115 Leavers (92.10 FTE) held positions within Housing and Technical
Resources. Table 4 shows the total leavers by Service and displays the headcount as a percentage of the Resource’s total leavers.
Table 4: Leavers by Resource Service Contribution to Resource Leavers
Resource No. of Leavers Total FTE
South Lanarkshire Council 1709 1239.55
Housing and Technical 115 92.10    
Directorate 1 1.00    
Housing Services 49 33.23    
Property Services 65 57.87 
When looking at the distribution of leavers by headcount (as above), Housing appears to have a higher proportion of leavers than expected relative to its size. This can
partly be explained by Housing Services having a lower average FTE per employee and we will also look at the leaving reasons in Table 6.
Table 5 details all leavers across Housing and Technical Resources and the reason for leaving while Table 6 shows a breakdown of the Top 5 leave reasons by Service.  
FT
79%
PT
21% Directorate
100%
Housing
Servcies
70%
Property
Servcies
84%
Directorate
1%
Housing
Services
43%
Property
Services
56%
68

Page 69

17
Table 5: Reasons for Leaving Housing and Technical Resources 
As shown above, the five most common reason for leaving Housing and Technical Resources were Retirement (31%), followed by Career Development (24%), Personal
Reasons (19%), Retirement Due to Ill Health (7%) and Termination of Temporary / Fixed Contracts (4%).  In total, these five reasons account for nearly 90% of all
leavers in the year 2023/24.
The top five reasons for leaving by Headcount are shown below for each Service, as a percentage of that Service’s total leavers:  
0
5
10
15
20
25
30
35
40
01 Retirement 12 Career
Development
19 Personal
Reasons
02 Retirement
Due To Ill Health
09 Termination
Of
Temporary/Fixed
Term/Contract
Staff
30 Resignation -
No Notice Given
10 Dismissal Due
To Ill Health
11 Dismissal Due
To Misconduct
13 Dissatisfaction
With Terms &
Conditions Of Job
17 Moving
Outwith Area
18 Travelling
Difficulties
Count of Assignment Sum of FTE
69

Page 70

18
Table 6                                                                                                                 Housing and Technical 
Directorate                      Housing Services                   Property Services   
Turnover
Turnover for the year 2023/24 was calculated as the total number of employees who left the Council from within Housing and Technical Resources between 1st April
2023 and 31st March 2024 (115), divided by the average number of employees in post during the year (1445).
The Turnover Rate for Housing and Technical Resources for 2023/24 was 7.96% and is broken down by Service below. This is lower than the Council rate of 10.46%.  
01 Retirement
31%
12 Career
Development
24%
19 Personal
Reasons
19%
02 Retirement
Due To Ill Health
7%
09 Termination Of Temporary/Fixed
Term/Contract Staff
4%
01 Retirement
100%
12 Career Development
37%
01
Retirement
27%
19 Personal
Reasons
20%
09 Termination Of
Temporary/Fixed
Term/Contract
Staff
4%
02
Retirement
Due To Ill
Health
4%
01
Retirement
34%
19 Personal
Reasons
18%
12 Career
Development
15%
02
Retirement
Due To Ill
Health
9%
30 Resignation - No
Notice Given
6%
70

Page 71

19
Table 7: Resource Turnover 
Although Directorate looks to have a high turnover rate, this is due to the small size of the Service (3 employees). There was only one leaver in the year which was
due to retirement.
We see a higher turnover from within Housing Services which is predominantly from Housing Officers and Housing Assistants leaving the Service. The main reason
for leaving Housing Services was for Career Development, with 37% of employees who left, leaving for this reason (as shown by Table 6). 
Property
6.86%
Housing
9.92%
Directorate
34.25%
Housing and Technical
7.96%
0% 5% 10% 15% 20% 25% 30% 35% 40%
71

Page 72

20
Section 4: Age Profile
Table 8: Housing and Technical Resources Age Profile 
Resource 16-19
Years
20-29
Years
30-39
Years
40-49
Years
50-59
Years
60-64
Years
65+
Years
No.
Employees
South Lanarkshire Council 61 1862 3536 3749 4475 1670 618 15971
Housing and Technical 17 200 276 273 402 186 87 1441    
Directorate - - - 1 - 2 - 3    
Housing Services 5 55 79 112 146 66 29 492    
Property Services 12 145 197 160 256 118 58 946 
As shown, South Lanarkshire Council has a predominantly older workforce, with 66% of employees being aged 40 or over and the largest age demographic being 50-
59, with 28% of the Council’s total employees.
Housing and Technical follows the Council trend with 28% of employees aged between 50 – 59 years, and 66% of the workforce over 40 years, however it is the only
one of two Resources which does not have a majority of its workforce over 50 years, with 47% of employees over 50. Both Housing and Property Services follow this
trend.
Table 9: Proportion of Age Band by Service  
16-19 Years
1% 20-29 Years
14%
30-39
Years
19%
40-49 Years
19%
50-59 Years
28%
60-64
Years
13%
65+ Years
6%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Directorate
Housing Services
Property Services
16-19 Years 20-29 Years 30-39 Years 40-49 Years 50-59 Years 60-64 Years 65+ Years
72

Page 73

21 
Section 5.1: Absence Rate
Absence rates for the Council are calculated each calendar month by dividing the total number of workdays lost due to absence by the total number of work days
available for that period. The absence rate for South Lanarkshire Council for the year 2023/24 was 5.38%.
The absence rate for Housing and Technical Resources was 5.79% which is down slightly vs. the previous year, 5.91%.
Total Absence %
(2023/24)
Short Term and Long Term Absence %
(2023/24) 
Despite ending the year at the same absence level as April, there has been an incremental decrease in sickness throughout the year. The main driver of this was
reduced rates of long term sickness, while short terms absences remained consistently around 2.00% for the majority of the year.  
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
73

Page 74

22
Table 10: Service Absence Levels 
Contribution to the absence rate by each Service is broadly similar, and each Service has seen all absence rates fall in the 2nd half of the year with the exception of
Property, where short term absences have risen across the year and have driven a small increase in the Resource’s overall short term sickness level: 
Housing Property   
Directorate , 3.14%Housing , 6.02% Property , 5.68%
0.00
1.00
2.00
3.00
4.00
5.00
6.00
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
-
1.00
2.00
3.00
4.00
5.00
6.00
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
74

Page 75

23 
Section 5.2: Absence Categories
The total number of working days lost in the year 2023/24 for Housing and Technical Resources was 20,247, which accounts for 10% of all working days lost by the
Council. Table 11 shows the number of working days lost due to specific categories of absence for the year 2023/24. The top four Reasons for absence are shown
and the remaining categories aggregated into Other.
Table 11: Days Lost Due to Absence Reason 
Psychological absences were the leading reason for absence, accounting for 33% of absences throughout the year, followed by Musculoskeletal (30%), Respiratory
(12%) and Stomach (10%).
Due to the year to year fluctuation of total numbers of absence, absence proportions are compared below. Each absence reason has been calculated as a
percentage of ‘working days lost due to absence reason’ divided by ‘total working days lost in year’ to illustrate changes in absence across the years 2022/23 –
2023/24.  
0
1000
2000
3000
4000
5000
6000
7000
Musculoskeletal Psychological Stomach Respiratory Other
75

Page 76

24
Table 12: Absence Reasons – Year to Year Comparison 
The Resource absence rate decreased in 2023/24 vs. 2022/23, however Psychological absences have seen a proportional increases of 4 points (and Stomach
related absences have risen by 3 points).
This trend is in line with the rest of the Council, where the proportion of Psychological absences has increased across all Resources year on year. 
0% 5% 10% 15% 20% 25% 30% 35%
Musculoskeletal
Psychological
Stomach
Respiratory
Other
2023/24 2022/23
76

Page 77

25
Housing and Technical Resources  Strategic Workforce Action Plan 2025 - 27
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications       
Recruitment,
attraction and
retention
Promote the
Council as an
employer of
choice through
job adverts
Attract more
candidates for
hard to fill posts 
Successful
recruitment
exercise with a
wider candidate
pool
Head of Service
and Personnel
Adviser
(recruitment) 
Revised
recruitment
adverts will be
provided by the
recruitment team
and hirings
managers will
provide context
relevant to
specific roles
Recruitment
campaigns in
Housing Services
planned for April
2025, the
campaign
December 2025 Within existing
resources
77

Page 78

26
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
material will be
reviewed
Promote further
the Chartered
Institute of
Housing
professional
standards 
Promote career
pathways and
progression in
professional roles
Attract more
candidates for
hard to fill posts 
Head of Service
and Personnel
Adviser
(recruitment)
Revised
recruitment
adverts will be
provided by the
recruitment team
and hirings
managers will
provide context
relevant to
specific roles
December 2025 Within existing
resources
78

Page 79

27
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Continue to
develop ‘grow
you own’
approach.
Specific roles
identified:
Housing
Assistant /
Housing officer
Talent pool of
developed staff to
fill professional
roles as they
become available
Heads of Service  Heads of Service
Modern
Apprentice
recruitment in
2025:
5 x MAs in
Housing Services,
current year
9 x MAs in
building services   
December 2025 Within existing
resources
Succession
planning for
across all
services,
particularly for
Team Leaders
and Supervisors 
developed future
leaders to replace
departing senior
managers  
Learning and
Organisational
Development and
Manager
HR Business
Managers and
Resource
management
teams
December 2025 Within existing
resources
79

Page 80

28
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Resolve
recruitment issues
relating to
establishment on
Fusion
Improved
recruitment
timescales 
HR Business
Manager
(operations)
Personnel Adviser
and Finance
Manager
Work is ongoing
to reach an
agreed position
on the
establishment
which will reduce
the timescales for
the post approval
process
June 2025 Within existing
resources
Transformation Asses the
workforce impact
of outcomes of
the Property
Services Review
Structure aligned
to service delivery 
Head of Service
and HR Business
manager
Personnel Adviser
and Property
Service manager
will progress the
implementation of
outcomes of the
review
December 2025 Within existing
resources
80

Page 81

29
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
Asses the
workforce impact
of outcomes of
the review of
factoring service
Structure aligned
to service delivery 
Head of Service
and HR Business
manager
Personnel Adviser
and Property
Service manager
will progress the
implementation of
outcomes of the
review
December 2025 Within existing
resources 
Review of
contracting
arrangements and
scope for bringing
work in house
More efficient use
of resources,
increased
establishment
Head of Property
Services
Building Services
Manager /
Procurement
Manager /
Personnel Adviser
December 2025 Within existing
resources 
Progress the
actions identified
as part of the
review of overtime 
Delivery of
services within
core staffing and
reduce
requirement for
overtime 
Head of Property
Services
HR Business
manager. The
action plan will be
monitored through
overtime updates
to RMT
Dec 2025 Achievement of
savings target
identified 
81

Page 82

30
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Progress the
actions identified
from the review of
management
structures
Efficient
management
structure in place 
Heads of Service HR Business
Manager
March 2026 Achievement of
savings target
identified
Skills Gap Develop skills
required to
support the
achievement of
net zero 
Skilled staff to
deliver key
resource activity 
Heads of Service L&D Adviser /
L&D Board
March 2026 Within existing
resources 
Develop green
skills within
property services
Skilled staff to
deliver key
resource activity
Heads of Service L&D Adviser /
L&D Board
March 2026 
Address the skills
gap in respect of
LHEES and
retrofitting 
Skilled staff to
deliver key
resource activity
Heads of Service L&D Adviser /
L&D Board
March 2026 Within existing
resources
82

Page 83

31
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
Digital skill
development to
support advanced
technology 
Skilled staff to
deliver key
resource activity
Heads of IT
Service
L&D Adviser /
L&D Board
March 2026 Within existing
resources 
Provide training to
enable employees
recognise the
impact of trauma
and adversity to
enable the
adoption the
trauma informed
principles
Embedding
trauma informed
practice in all
aspect of social
work services 
Heads of Service HR Business
manager / L&D
Adviser / L&D
Board
March 2026 Within existing
resources 
Identify steps
required to reduce
Digital exclusion
Employees able
to engage with
digital services
across the
Council
Head of
Personnel
Head of IT
services, L&D
Manager
December 2026 Within existing
resources
83

Page 84

32
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Maintain ongoing
CPD
Maintenance of
professional
development
standards
Heads of Services Managers as part
of appraisal
process
March 2026 Within existing
resources
Delivery of key
Resource
activity
Assess
implications for
MAPPA and
asylum and
increased
workload 
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
There is
increased
demands on the
existing
employees due to
increased activity
in these areas.
March 2026 Within existing
resources 
Assess employee
implications of
revised Housing
Bill
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
March 2026 Within existing
resources, there
may be external
funding from
Scottish
84

Page 85

33
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
Government to
support this
Realign staffing
due to reduction
in contract work -
movement repairs
/ maintenance 
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
March 2026 Within existing
resources 
Assess employee
implications of 10
year Estates
Strategy
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
This is also linked
to the Agile
working
arrangements
which could
require increased
maintenance or
impact lifespan of
work locations for
employees. 
March 2026 Within existing
resources
85

Page 86

34
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Assess employee
implications of
achievement of
net zero
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
Key housing and
property actions
require to be
compliant with
climate and
sustainability
measures. In
some case this
requires new
skills that are not
currently  within
the existing
workforce 
March 2026 Within existing
resources 
Review support
required with
respect to
ongoing
homelessness
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
March 2026 Within existing
resources
86

Page 87

35
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
crisis and related
workload 
Assess employee
implications of
HOME project -
implementation
Developed and
available staff to
deliver key activity
Heads of Service HR Business
manager 
The new
integrated
management
system will impact
across the whole
resource. Support
and training have
been incorporated
into the project
plan 
June 2026 Within project
resources 
Assess employee
implications of 
customer contact
review
Staff able to
operate new
systems which
will increase
Head of Finance
(transactions)
Service managers
and IT services
June 2026 Within existing
resources
87

Page 88

36
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
effectiveness and
capacity 
Maintaining
employee health
and well being
Improved
employee
engagement
across servers 
Engaged
employees will
contribute to
overall
effectiveness of
services
Head of
Personnel
All managers
across services
March 2026 Within existing
resources 
Partnership
working with TUs
Continue to
maintain existing
relations with TUs
improving
employee
relations and
overall employee
experience
Head of
Personnel
All managers
across services
March 2026 Within existing
resources 
Annual review of
employee
wellbeing
Supported,
engaged, and
Head of
Personnel
All managers
across services
March 2026 Within existing
resources
88

Page 89

37
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
initiatives and
campaigns to
provide to
improved
supports and
increase
resilience of
employees 
motivated
workforce 
Promote
employee
recognition
through appraisal 
Supported,
engaged, and
motivated
workforce 
Head of
Personnel
All managers
across services
March 2026 Within existing
resources 
Employee
recognition
Supported,
engaged, and
motivated
workforce 
Head of
Personnel
All managers
across services
March 2026 Within existing
resources 
Mentoring and
coaching
Supported,
engaged, and
Head of
Personnel
All managers
across services
March 2026 Within existing
resources
89

Page 90

38 
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to
deliver? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support do
we need? Who
else needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
motivated
workforce 
Refresher training
absence
management 
Supported,
engaged, and
motivated
workforce 
Head of
Personnel
All managers
across services
March 2026 Within existing
resources
90

Page 91

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Scottish Housing Regulator – Annual Assurance
Statement 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval to submit the Annual Assurance Statement for South Lanarkshire
Council to the Scottish Housing Regulator 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the South Lanarkshire Council Annual Assurance Statement 2024/2025
(attached as Appendix 1) be approved and submitted to the Scottish Housing
Regulator. 
3. Background
3.1. The Scottish Housing Regulator (SHR) was established in 2011 as an independent
body directly accountable to the Scottish Government to regulate registered social
landlords (RSL’s) and local authority housing and homelessness services.  The SHR
does this by assessing and reporting on social landlord’s delivery of services, RSL’s
financial well-being and standards of governance and where necessary intervening
to secure improvements. 
3.2. The SHR Regulatory Framework requires local authority landlords to submit an
Annual Assurance Statement confirming compliance with regulatory requirements
and, if appropriate, identify any material breaches. Examples of such material
breaches specific to local authorities include those that seriously affect the interests
and safety of tenants, people who are homeless or other service users; threaten the
stability, efficient running or viability of service delivery arrangements and bring the
landlord into disrepute or raise public or stakeholder concern about your organisation
or the social housing sector. 
3.3. The framework is subject to 5 yearly review and in February 2024, following
consultation with stakeholders, the SHR published its new Regulatory Framework
and statutory guidance for social landlords. 
3.4. The new framework went live from 1 April 2024 and sets out how SHR will regulate
social landlords in Scotland. 
10
91

Page 92

3.5. In response to the feedback from stakeholders, the Regulator has maintained much
from the previous framework. The revised framework includes a provision which 
requires landlords to provide explicit assurance in the Annual Assurance Statement
(AAS) on the following issues:- 
♦ gas safety  
♦ electrical safety 
♦ water safety  
♦ fire safety  
♦ asbestos 
♦ damp and mould  
♦ lift safety 
3.6. South Lanarkshire’s Annual Assurance Statement for 2023/2024 was approved by
Housing and Technical Resources Committee on 18 September 2024 and
subsequently submitted to the SHR. 
4. South Lanarkshire Council Annual Assurance Statement
4.1. The Annual Assurance Statement 2024/2025 for the Council is attached as Appendix
1, as recommended by SHR guidance, the statement is short, succinct, and based
upon the format provided by the regulator.   
4.2. The key requirement of the Annual Assurance Statement is for the Committee to
confirm that it is confident that appropriate systems, evidence, relationships, and
channels of communication are in place to ensure the effective planning, delivery
and monitoring of relevant services against statutory and regulatory requirements. 
4.3. Within South Lanarkshire, the assurance required is provided through a wide range
of arrangements which are in place, at a Council and Resource wide level.  A
summary of the key requirements for assurance and how these are addressed is
attached as Appendix 2.
4.5. Provided that tenant and resident safety is not compromised, the SHR continues to
indicate they will not engage with a landlord where it does not fully comply with
regulatory requirements, and the landlord has effective plans to return to full
compliance. In relation to this year’s statement there are 2 points to highlight in
relation to compliance, highlighted below, where the Council is partially compliant:-
♦ Fire Tolerable Standards
♦ Fixed Electrical Testing 
4.6. In relation to the reporting requirements of Fire Tolerable Standards, there are
currently:  
♦ 65 Smoke, Heat and CO out with date (installation of combined alarms to all
houses by required date). 
♦ Fixed Electrical Testing, there are currently 186 (completion of five yearly checks
on electrical systems) out with date. 
A programme of work is progressing well however a number remain outstanding
due to the ability to gain access to carry out the installations/testing.  A robust
programme of work is in place to address these issues, with appropriate use of
forced entry where individuals repeatedly fail to allow access.  Progress in
relation to this work is closely monitored within the Resource.
92

Page 93

4.7. In relation to equalities and human rights, guidance on equalities data collection,
‘Collecting equality information: National guidance for Scottish social landlords’ was
published in August 2021 and updated in June 2022. In this year’s Annual
Assurance Statement, social landlords are asked to provide assurance that they
have or are in the process of implementing an effective approach to the collection of
equalities information and are considering how a human rights approach to their
work can be adopted. The council’s position in relation to this has been reflected in
the proposed Annual Assurance Statement. 
5. Next Steps
5.1. Subject to approval, the Annual Assurance Statement will be signed off by the Chair
of Housing and Technical Resources Committee and returned, as required, to the
Scottish Housing Regulator to confirm the required assurance. 
5.2. The results of the Annual Return on the Charter 2024/2025 are presented as a
separate report to this Committee. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1  The costs associated with the legislative programmes are already taken into account
within existing budgets. 
7.2  The costs associated with the forced entry programme will be closely monitored. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
9. Other Implications
9.1. There are no additional risks associated with this report.
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, strategy or plan and is not subject to
impact assessment requirements. 
9.2. In addition to regular regular discussion with the Tenant Participation Co-ordination
Group on performance and Charter reporting, specific engagement has taken place
to confirm arrangements for the development and submission of the Annual
Assurance Statement. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
17 September 2025 
93

Page 94

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent 
Previous References
 Housing and Technical Resources Committee – 23 January 2019 (Our regulation of
Scottish Housing) 
 Housing and Technical Resources Committee – 4 September 2019 (Scottish Housing
Regulator - Regulation of Social Housing in Scotland) –
 Housing and Technical Resources Committee – 18 September 2024 (Scottish Housing
Regulator – Annual Assurance Statement) 
List of Background Papers
 Our Regulation of Scottish Housing – a discussion paper January 2018
 Our Regulation of Scottish Housing – a Consultation October 2018 
 Our Regulation of Scottish Housing – Final Framework 2019
 Our Regulation of Scottish Housing – Final Framework 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Heather Phillips, Performance Co-ordinator
heather.phillips@southlanarkshire.gov.uk 
94

Page 95

Appendix 1 
Housing and Technical Resources
Executive Director Stephen Gibson 
South Lanarkshire Council Annual Assurance Statement 
South Lanarkshire Council complies with the regulatory requirements set out in Chapter 3
of the Scottish Housing Regulator’s Framework. This includes that we:- 
 achieve all standards and outcomes in the Scottish Social Housing Charter for
tenants, people who are homeless and others who use our services 
 comply with all our legal obligations relating to housing and homelessness, equality
and human rights, and tenant and resident safety with the exception of the following:- 
• Fire Tolerable Standards/Fixed Electrical Testing / Combined Smoke ,Heat and
CO Alarms – a programme of work is progressing well, however, a number
remain outstanding due to the ability to gain access to carry out the
installations/testing.  A robust programme of work is in place to address these
issues which is being closely monitored within the Resource. 
In relation to equalities data collection and human rights, the Council has well established
processes and policies in these areas, with consideration already embedded in how we
deliver services. Work is being progressed to further develop and adjust our existing
approach to the collection of equalities and human rights information along with other
changes to reflect the requirements of the regulatory guidance. 
On an ongoing basis, the Committee specifically consider the information and evidence
necessary to provide the required assurance. 
The Annual Assurance Statement for 2024/2025 was approved at the meeting of the
council’s Housing and Technical Resources Committee on 8th October 2025. 
Chair’s signature: 
Date: 
95

Page 96

Appendix 2
Assurance Requirements 
What Assurance required How assurance is evidenced
Monitor and
report
performance
Performance Management
Framework in place and
appropriately reported 
On an annual basis a report is provided
to Housing and Technical Resources
Committee on performance against
Scottish Social Housing Charter
requirements. Performance against the
charter requirements for 2024/25 will be
reported to Committee in December
2025. 
Effective Resource and Service
planning arrangements are in
place. 
Resource and Service plans are in
place to monitor progress at different
levels of the planning hierarchy i.e.,
Community Plan, the Connect (Council)
Plan, Resource and Service Plan
actions and measures. 
Progress against Connect and
Resource Plan objectives are reported
to Housing and Technical Resources
Committee and Executive Committee
on a twice-yearly basis. 
In conjunction with the above, the
Resource Learning and Development
Plan plays a key role in delivering
assurance and as such we are
committed to providing the highest
levels of professionalism across our
services. As part of this plan and to
further support our commitment, we
signed up to the Chartered Institute of
Housing Scotland’s, ‘Housing
Professionalism Commitment’ in June
2024.  
Appropriate Internal Audit
arrangements are in place 
A comprehensive internal audit
programme is reviewed and
implemented yearly in line with service
requirements. 
Progress against the audit programme
is reported to Finance and Corporate
Resources Committee annually. 
Equality and
Diversity 
Equality and diversity issues are
effectively considered when
making decisions.
Work within the Resource in relation to
equality and diversity is reported to
Housing and Technical Resources
Committee on an annual basis. The
next update will be presented to
Committee on 8 October 2025. 
96

Page 97

What Assurance required How assurance is evidenced
Involve
tenants and
other relevant
service users 
Council and Resource Customer
satisfaction levels 
The Resource has a rolling programme
of customer satisfaction surveys in
place. These are used to inform policy
and service development.
Key results from the survey programme
are reported to the Housing and
Technical Resources Committee as
part of the annual report on
performance against the Scottish Social
Housing Charter. 
Customer Involvement and
Scrutiny Programme in place
and being delivered 
The Customer Involvement Strategy
was reviewed in conjunction with
members of the Tenant Participation
Co-ordination Group and was open for
consultation between September and
December 2023. The strategy was
approved by Housing and Technical
Resources Committee on 7 February
2024, with the first annual update to be
reported to Committee on 8 October
2025.
Legal
obligations
Ensure that all legal obligations
associated with housing and
homelessness are adhered to.
The Resource Strategy and Policy
Review Framework ensures policies
and strategies are reviewed on a
cyclical basis to confirm that they are
delivering the intended outcomes,
reflect changes in policy/services
context and are consistent with legal
and regulatory requirements. 
An update on the framework is
presented to Housing and Technical
Resources Committee on an annual
basis, with the next update scheduled
for Committee in March 2026. 
Risk Management Strategy is reported
to the Housing and Technical Resource
Committee on a yearly basis. The next
update will be reported to Committee
on October 2025. 
This council’s approach to risk
management promotes consideration of
risk in service delivery, planning and
decision-making processes.  The
Strategy requires Resources to record
and review risks and control actions
regularly.  
Tenant and
resident safety
Have evidence to ensure that all
legal obligations associated with
tenant and resident safety are
met.
Effective systems for monitoring and
reporting health and safety issues are
in place within the Resource and
monitored through the council’s
97

Page 98

What Assurance required How assurance is evidenced
Corporate Management Team. Any
proposals to address emerging health
and safety requirements would be
reported to Housing and Technical
Resources Committee and the Annual
Return on the Charter. 
98

Page 99

Report 
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)
Executive Director (Finance and Corporate Resources)  
Subject: Additional Staffing – Building Services 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide an update on the review of the use of external sub-contractors, proposing
in-house resourcing options, revised Out of Hours structure and Void
Management delivery within Building Services 
2. Recommendations
2.1. The Committee is asked to approve the following recommendations(s):- 
(1) that the in-house resourcing option for the Fixed Electrical Testing Programme
(Housing), Kitchen Upgrade Programme (Housing) and Fencing Works
(Housing), and the proposal for additional resources, be approved;
(2) that the Out of Hours Team resourcing option for the Standby Team, and the
proposal for addition resources, be approved;
(3) that the resourcing option for the Voids Team, to make 12 temporary staff (11
temporary trades operatives and one Building Services Officer) permanent
and the addition of a further 7 trades operatives, to maintain progress
achieved to date while reducing overtime costs, be approved; and
(4) that the addition of posts to the Housing and Technical Resources’
establishment, as detailed in Section 5 of the report, be approved. 
3. Background 
In-House Resourcing
3.1. The Housing and Technical Resource has undertaken a review to establish and
prioritise opportunities to reduce external contractor spend and subsequently bring
work in-house in relation to Property Services. The result of the review concluded the
following areas should progress:- 
 Fixed Electrical Testing (Housing)
 Fencing Works (Housing)
 Kitchen Upgrade Programme (Housing) 
Out of Hours - Standby
3.2. The Housing and Technical Resources out of hours and standby team arrangements
have been reviewed to provide more resilience to deliver emergency repairs.  The
out of hours and standby teams were created in June 2022 to address specific
service needs and reduce the effect on service delivery of the wider repairs team.   
11
99

Page 100

3.3. There are 3 teams consisting of 3 joiners, 3 plumbers, and 3 electricians, each
allocated within each team, therefore 18 staff in total. The out of hours repairs
service operates from 16:00 to 23:45 Monday to Friday, with standby from 23:45 until
08:00. On Saturday and Sunday, the teams cover 08:00 to 23:45, and standby from
23:45 to 08:00. 
Voids
3.4.  In response to the backlog to properties that were classified as void, additional
resources were established within Building Services on a temporary basis, with the
aim of improving timescales, particularly to positively impact on new tenants, support
homelessness by reducing the overall number of void properties being reported
monthly. A total of 11 tradespersons were recruited on a temporary contract basis.
However, these arrangements are in place on a fixed term basis until December
2025. 
3.5. This enabled a dedicated team to be allocated to work on void properties and has
resulted in a material improvement of void management KPIs. 
3.6. Since the temporary resource has been in place, the following progress has been
achieved and maintained:- 
 void property numbers have now fallen significantly from a high of 411 in 2024
to consistently being under 200 now for the last 12 months
 3414 voids have been turned around since 1 April 2024 to 31 March 2025
 the total days to let properties is a benchmarked Charter Indicator and has
improved by over 25% since the additional resources were introduced
 the average days to let for 2024/2025 across South Lanarkshire is 19 days,
against our target of 26 days.  This is a continued decrease from 22 days in
2023/2024 and 23 days in 2022/2023
 we have now almost eliminated the use of sub-contractors on voids with over
99% of works now being completed in-house by Building Services
 high levels of customer satisfaction from new tenants on the quality of
properties being handed back since September 2024, with 933 reported as
being satisfied with the condition of their new property out of 938.  Follow up
surveys on any not satisfied are carried out to address any remaining concerns 
3.7. This improved performance contributes to the Council’s overall objectives and
responds directly to challenges created by the housing crisis. By making this team
permanent, Building Services will maintain improvements in service delivery and
reduce ongoing costs to the HRA. 
4. Proposal 
In-House Resourcing
4.1. Subject to approval and following a review of all possible options for Building
Services to take work programmes in-house, the following areas were considered
and will progress to implementation phase. 
 Fixed Electrical Testing (Housing)
 Kitchen Upgrade Programme (Housing)
 Fencing Works (Housing) 
4.2. For fixed electrical testing, it is proposed that 10 electricians are added to the
establishment and that plant, vehicles and equipment are purchased. This will allow
for the full housing fixed electrical testing programme and remedial works to be
100

Page 101

delivered completely in-house, removing the need for sub-contracting the
works and giving greater control over resources and standards of service. 
4.3. Similarly, in relation to the kitchen upgrade programme, it is proposed that 8 joiners,
4 building service operatives, one plasterer, 2 plumbers are added to the
establishment, and that plant, vehicles and equipment are purchased.  Again, this
will allow for the full housing kitchen upgrade programme to be delivered completely
in-house, reducing the cost/reliance of sub-contractors and increasing control. 
4.4. It is also proposed that for the fencing works programme, 10 joiners are added to the
establishment, along with necessary plant, vehicles and equipment.  Using the same
logic as above, this will allow for all external fencing works to be delivered completely
in house and simultaneously provide additional flexibility of general joinery repairs
where required. This removes the need for sub-contracting the works and giving
greater control over resources and standard of service. 
Out of Hours - Standby
4.5. It should be noted that the out of hours and standby team has no provision to provide
cover for rest periods when standby teams are called out, holidays or sickness cover.
To address within the current arrangements, the proposal is to expand the team to
include a further 2 tradespersons (a plumber and joiner which are the busiest
trades), ensuring cover for any resource gaps moving forward. 
Voids
4.6. The initial temporary proposal was for 12 temporary staff, which included 1 Building
Services Officer and 11 trades operatives, was focused on reducing void numbers.
As part of the evaluation process of the current arrangements, the following was also
considered:- 
 levels of overtime across the Resource that has been required in associated
with the completion of void works
 the further positive impact that can be made in number of voids, void
timescales, Energy Performance Certificates (EPCs), hand over to tenants
quicker, improved outcome 
4.7. It is proposed that along with making the temporary team permanent, there is a
business case to support the recruitment of 7 additional trades operatives:- 
 2 electricians
 2 plasterers
 2 painters
 one joiner 
5. Employee Implications
In-House Resourcing
5.1. It is proposed for the Fixed Electrical Testing (Housing) programme that the following
posts should be added to the Housing and Technical Resources’ establishment on a
permanent basis:-
101

Page 102

Post No of
Posts
Grade SCP
range
Hourly
Rate
Annual
salary
Gross
Cost inc
on costs
29.7%
Total cost
Trades
operative 
(electrician) 
10  G3 L2  63-65  £22.36-
£22.85 
£43,136-
£44,079 
£55,947-
£57,171 
£559,479-
£571,710
Total        £559,479-
£571,710 
5.2. It is proposed for the Kitchen Upgrade Programme that the following posts should be
added to the Housing and Technical Resources’ establishment on a permanent
basis:- 
Post No of
Posts
Grade SCP
range
Hourly
Rate
Annual
salary
Gross
Cost inc
on costs
29.7%
Total cost
Trades
operative
(Joiner) 
8 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£399,494-
£410,944
Trade
Operative
(Plumber) 
2 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£99,873-
£102,736
Trade
Operative
(Plasterer) 
1 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£49,936-
£51,368
Building
Services
operative 
4 G1 L4  30-31 £19.96-
£20.53
£28,610-
£28,951
£37,107-
£37,550
£148,431-
£150,200
Total        £697,734-
£715,248 
5.3. It is proposed for the Fencing (Works) Programme that the following posts should be
added to the Housing and Technical Resources’ establishment on a permanent
basis:- 
Post No of
Posts
Grade SCP
range
Hourly
Rate
Annual
salary
Gross
Cost inc
on costs
29.7%
Total cost
Trade
Operative
(Joiner) 
10 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£499,368-
£513,680
Total        £499,368-
£513,680 
Out of Hours - Standby
5.4. It is proposed that the following posts should be added to the Housing and Technical
Resources’ establishment on a permanent basis:-
102

Page 103

Post No of
Posts
Grade SCP
range
Hourly
Rate
Annual
salary
Gross
Cost inc
on costs
29.7%
Total cost
Trades
operative
2 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£99,873-
£102,736
Total        £99,873-
£102,736 
Voids
5.5.  It is proposed that the 12 FTE temporary posts are made permanent and that 7 FTE
additional permanent posts are created and added to the establishment:- 
Post No of
Posts
in
current
team
(temp)
No of
Posts
propo
sed
(perm
)
Grade SCP
range
Hourly
Rate
Annual
salary
Gross
Cost inc
on costs
29.7%
Total cost
Building
Services
Officer
1 1 G3 L2  63-65 £22.36-
22.85
£43,136-
£44,079
£55,947-
£57,171
£55,947-
£57,171
Trades
operative
(Current)
11 11 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£549,305-
£565,048
Trades
operative 
0 7 G2 L4  55-57 £19.96-
£20.53
£38,501-
£39,605
£49,936-
£51,368
£349,557-
£359,576
Total  12 19      £954,811-
£981,796 
6. Financial Implications 
In-House Resourcing
6.1. All 3 areas outlined in 5.1 to 5.3 are deemed cost neutral as works currently being
sub-contracted in full. Total cost for all 3 work programmes detailed in section 5 is up
to £1.936 million. This total figure includes additional vans to support the additional
in-house work activities. 
Out of Hours - Standby
6.2. The proposed new structure would increase staffing costs by £0.103 million and can
be managed within the existing budget for property services. 
Voids
6.3. Converting the current team of 1 Building Services Officer and 11 temporary
operatives to permanent would mean an ongoing cost of £0.622 million per annum,
however this cost is already being incurred and is covered by payment from HRA for
the delivery of service.  Additional trades posts 
7. Climate Change, Sustainability and Environmental Implications
7.1. This report implements no changes that would affect climate change, sustainability or
environmental implications. 
8. Other Implications
8.1. As the in-house resourcing proposal is a significant change in resource levels, it is
expected that a recruitment/marketing campaign would be beneficial to increase
103

Page 104

awareness of upcoming vacancies, encouraging the best candidates to apply for
the new roles. 
8.2. The standby team provide an important service within the structure of South
Lanarkshire Councils repairs policy where we are providing an out-of-hours
emergency repairs service to vulnerable and elderly tenants 24hrs/7 days a week, so
it is imperative we make this service cost effective to be able to carry out this role
within the Council. The standby team also work with other departments to carry out
repairs to keep them within response times and making sure tenants are not at risk.   
8.3. The Scottish Government declared a Housing Emergency on 15 May 2024.  There is
a link in improvements in void turnaround times and being able to reduce the time
families and children spend in temporary accommodation.  Improved void
performance can also assist with improved availability of temporary accommodation
to avoid the council breaching its obligations under the Unsuitable Accommodation
Order.   
9. Integrated Impact Assessment and Consultation Requirements
9.1. This Report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. Trade Unions have been updated via the Joint Consultative Committee with further
consultation planned once this report is approved. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
Jackie Taylor 
Executive Director (Finance and Corporate Resources) 
25 September 2025   
Link(s) to Council Values/Priorities/Outcomes
 Excellent Employer
 Focused on people and their needs
 Effective and Efficient 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Craig Jardine, Head of Property Services 
Ext: 4862  (Tel: 01698 454862)
E-mail:  craig.jardine@southlanarkshire.gov.uk 
104

Page 105

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Acquisition of Right of Access to Land and
Construction of Affordable Homes at Calderwood
Road, East Kilbride 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval from the Housing and Technical Resources Committee to secure a
right of access over land at Cornfoot Crescent to enter into the area of land at
Calderwood Road, East Kilbride from Persimmon Homes, on which 37 affordable
housing properties will be constructed by Persimmon Homes, for inclusion in the
Council’s housing stock
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the acquisition of the right of access over the land at Cornfoot Crescent,
East Kilbride (delineated on the plan at Appendix 1) leading to the area of
land at Calderwood Road, from Persimmon Homes, and the funding package
for the acquisition of the right of access over the land and construction by
Persimmon Homes on the area of land at Calderwood Road, East Kilbride of
37 affordable homes for a total price of £7,818,210 (which includes the cost of
South Lanarkshire Council (SLC) internal Fees) (exclusive of Value Added
Tax), be approved; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters pertaining to these transactions and enter into all necessary legal
agreements on terms which are in the best interests of the Council;
(3) that it be noted, the award of a negotiated works contract to Persimmon
Homes for the construction of the 37 affordable housing units on the land at
Calderwood Road, East Kilbride, from which title to access the site is to be
acquired as recommended at Clause 1, will be secured in accordance with the
Council’s Standing Orders on Contracts; and
(4) that it be noted the transfer of development land from the Corporate Land
Bank to the Housing Revenue Account for the Gross Value of £1 million, with
costs of any site abnormalities to be deducted from this value once identified. 
3. Background
3.1. The Local Housing Strategy 2022 to 2027 was approved at the Executive Committee
on 30 November 2022.  In doing so, it was noted that the Council and its partners
gave a commitment to actively seek opportunities to develop housing across South
Lanarkshire to meet housing need and support social and economic regeneration.
12
105

Page 106

3.2. On 30 November 2022, the Executive Committee approved a new affordable
housing supply target for the Council, aiming to deliver an additional 1,300 homes by
31 March 2027.  The proposal was for this to be delivered through a combination of
new council homes and the acquisition of existing homes from the market, with the
new sites set out within the Strategic Housing Investment Plan which (SHIP).  On 27
November 2024, as part of approval of the Strategic Housing Investment Plan 2025
to 2030, Housing and Technical Resources was advised that due to a range of
external factors this target was unlikely to be achieved, however efforts and focus
was still being given to maximise the number of additional council homes to be
delivered by March 2027. 
3.3. On 27 November 2024, the Strategic Housing Investment Programme 2025 to 2030
was approved by the Housing and Technical Resources Committee.  This includes
projects with a total potential capacity for delivering up to 1,995 affordable homes in
South Lanarkshire over the 5-year period to March 2030 and included reference to
new council homes proposed at Calderwood Road, East Kilbride. 
4. Proposal
4.1. In April 2025, the Council commenced discussions with Persimmon Homes
regarding the opportunity to acquire land that will provide access to vacant council-
owned land, located to the Southeast of Hunter Primary School, which is currently
land locked. Persimmon Homes expressed a desire to utilise this as an opportunity
to develop new affordable homes for the Council through a turnkey arrangement,
with the Council paying staged payments for each key stage completed for each
house. The mix of houses across the sites consists of 3-bedroom semi/terraced
houses, 4 bed semi-detached houses and 2-bedroom cottage flats and terraced
houses. It is anticipated that these houses will be complete in 2026/2027. 
4.2. Persimmon Homes own the existing residential development to the Southeast of the
land at Calderwood Road, East Kilbride which is otherwise land locked as mentioned
at Clause 4.1. 
4.3. As part of those discussions with Persimmon Homes, the costing and financial
proposals provided by Persimmon Homes have been assessed by the Council and
the funding package presents value for money for the Council. 
4.4. It is therefore proposed to enter into a Development Agreement with Persimmons
Homes that will secure access to the Council site at Calderwood Road and the
construction of 37 affordable homes, with missives subject to the following
suspensive conditions:- 
 that Persimmon Homes obtain planning consent on terms agreeable to the
Council
 that the Council receive Scottish Government grant funding approval from the
Affordable Housing Supply Programme. 
4.5. Following the reasonable satisfaction of the above suspensive conditions the
contract would then proceed on the below basis:- 
 the Council will acquire servitude right on land in exchange for the land
payment 
 the balance for each property constructed will then be paid on completion of the
following stages – Floor Slab, Wind and Watertight, and Completion
106

Page 107

 the Council will receive a third-party warranty covering defects and structure for
a period of no less than 10 years
 each party will be responsible for their own legal fees 
5. Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. Acquisition of the right of access and contract for the construction of the properties
will be funded from the Housing Revenue Account, Capital Programme and will be
eligible for Scottish Government Affordable Housing Supply Programme grant
funding which will reduce the overall cost to the Council. 
6.2. The proposed purchase price for each unit type compares favourably with the asking
prices of the same house types within the development and prices of similar new
properties on the open market. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained within the report.  All homes will be built to
Housing for Varying Needs standards and Silver aspect 2 level for energy standards. 
8. Other Implications
8.1. Should the acquisition of the right of access and construction of the 37 homes from
Persimmon Homes not progress, there may be implications to the Council’s ability to
meet increasing housing need in the East Kilbride area.   
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
18 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Good quality, suitable and sustainable places to live 
Previous References
 Local Housing Strategy 2022 to 2027 – Executive Committee, 30 November 2022
 Housing Supply Target – Executive Committee, 30 November 2022 
107

Page 108

List of Background Papers
 Strategic Housing Investment Programme 2024 to 2029 – Housing and Technical
Resources Committee, 8 November 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Amy Roxburgh, Property Manager (Consultancy Services)
Ext: 3517   (Tel: 01698 453517)
E-mail: Amy.Roxburgh@southlanarkshire.gov.uk
108

Page 109

12
109

Page 110

110

Page 111

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject:  Thankerton Hall – Community Asset Transfer to the
Thancard Trust 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for the disposal of Thankerton Hall to the
Thancard Trust under Community Asset Transfer (CAT) and seek approval to the
principal terms and conditions as set out in Section 5 of the report
[1purpose]  
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at Thankerton Hall, 49 Station Road, Thankerton, ML12 6NZ,
be disposed to the Thancard Trust subject to the terms and conditions outlined
in Section 5 of the report; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. Thankerton Hall was previously managed by South Lanarkshire Leisure and Culture
(SLLC). However, following a review of its business plan, the SLLC Board announced
in March 2024 that it could not sustain service delivery from this facility and control
was to be returned to the Council. In recognition of the potential impact upon
communities, the council invited local organisations to express interest in these
properties through CAT, with support from the Community Fightback Fund (CFF) and
the Renewable Energy Fund (REF) to keep facilities open while this process took
place. 
3.2. At the South Lanarkshire Council meeting on 27 March 2024, the Executive Director
(Housing and Technical Resources) obtained approval for temporary delegated
authority to enter into annual arrangements with community organisations to take over
the management of facilities affected by budget decisions. The annual lease of the
property to the Thancard Trust was approved by delegated powers with a date of entry
of 2 October 2024.  
13
111

Page 112

3.3. The Community Group subsequently submitted a request for the CAT of the hall by
sale, the validation date for which was 12 February 2025. Legislatively a decision
should have been made by the 12 August 2025. However, the extents requested
under the CAT application were reduced following discussions between the
applicants and the Council. A request to extend the process to accommodate this
alteration and the Committee schedule has been approved by the applicant who has
agreed to this matter being presented at Committee on 8 October 2025 for
consideration. 
3.4. Public consultation was undertaken between 3 February and 12 March 2025 with one
objection received, based on potential issues with noise, traffic, and parking. These
issues have been noted by the applicants and will be addressed in the proposed
operation of the property. As part of the organisation’s independent consultation, a
survey has shown a level of 98% support from local residents for the proposed asset
transfer. 
3.5. The request was placed before the Community Asset Transfer Assessment Panel on
30 July 2025 when the following matters were taken into consideration. 
3.6. Property
3.6.1. The property, which extends to 277 sq m or thereby, is on a site extending to 905 sq
m or thereby, is shown on the attached plan. It comprises a single storey brick
roughcast hall with a pitched slate roof.  The building has a mixture of single glazed
timber and double glazed UVPC windows and a mixture of cast-iron and UVPC
rainwater goods and timber doors. A vehicular access route leads past the eastern
elevation to a small car park at the rear, surfaced with red stone chips. There is a
disabled access ramp to the rear of the building.  An area of landscaping and bushes
separates the site from the main road. 
There is an electricity sub-station bounded with metal palisade fencing located at the
north-eastern corner of the site. 
3.6.2.  The property is currently used by the applicant for the purposes of operating a scout
troop, with hires to local community groups for their own activities. As there is no
proposed change of use or development, planning consent will not be required for
continued use. Any subsequent alterations to the layout or use of the property/site may
require the relevant consents and this would be the responsibility of the group to
obtain. 
3.7. Organisation
3.7.1. The Thancard Trust is registered as a SCIO number SC0519909, having registered
this entity on the 4 August 2022 with the office of the Scottish Charitable Register. 
3.7.2. The Thancard Trust has existed since 2022. The membership comprises a number
highly motivated individuals with a diverse range of skills who are active in
community representation via the community council and other such organisations. 
The introduction of key individuals from the Biggar Scout Group’s leadership has
brought new skills and diversified the membership, which has been beneficial to the
ongoing operations of the trust. It is anticipated that this will offer an additional
degree of successional planning.  
112

Page 113

3.8. Project
3.8.1. Having successfully operated the facility on an interim basis during the concessionary
lease, the proposal is for the Community Group to continue to occupy, use and
maintain the building in long-term. 
4. Assessment
4.1. The property is suitable for the proposed use and the organisation has the capacity
and access to funds to manage the facility. 
4.2. The disposal will enable the Community Group to continue to operate the facility and
remove liability for the Council in maintenance. In addition, the sale will allow the Club
to pursue external funding for the development of the facility. 
4.3. The Council has no alternative operational requirement for the subject. The risks of
the transfer are considered low, as the property is an existing/established community
hall and surrounded by land, owned by the Council and used as a play area. Therefore,
it is not considered that the property has any realistic alternative development
potential. 
4.4 Within their asset transfer request, the Thancard Trust requested a 100% discount on
the jointly agreed, independent valuation. As the price to be paid reflects the
Community Benefit, which has been assessed as very good, and the requirement to
seek Best Value in the disposal of a Council asset, a discount of 80% of the
unrestricted market value is recommended, which is consistent with previous sales
transactions for properties of a similar nature. 
4.5 An independent valuation was prepared by the J and E Shepherd Chartered Surveyors
which reported that the Market Value of the property with vacant possession as at 29
August 2025, may be fairly stated as being in the sum of £45,000 (Forty-Five
Thousand Pounds). 
5. Proposal
5.1. It is proposed to sell Thankerton Hall, 49 Station Road, Thankerton, ML12 6NZ to The
Thancard Trust, on the following principal terms and conditions:- 
1. the purchaser will be the Thancard Trust
2. the purchase price is £9,000 (Nine thousand pounds) exclusive of VAT (which
reflects 80% discount on the independent valuation)
3. date of Entry to be agreed
4. each party to bear their own Legal Fees
5. the purchaser will be responsible for obtaining planning and any other relevant
consents relating to the use and any proposed alterations 
6. Employee Implications
6.1. None 
7. Financial Implications
7.1. If the sale outlined in this report is approved by the Committee, it will remove any
liability for costs associated with the vacant property. 
7.2 The sale of the property will generate a Capital Receipt of £9,000, for the Council’s
General Services Account (assumes an 80% discount on the Market Value of £45,000
noted in section 4.5).  
113

Page 114

8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. In terms of the Community Empowerment (Scotland) Act 2015, the Council had until
12 August 2025 to make a decision. The group agreed to a request to extend the
deadline to allow the matter to be considered at the Housing and Technical Resources
Committee meeting. 
9.2. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request is refused or the organisation do
not agree with the proposed terms and conditions. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities. 
Previous References
 South Lanarkshire Council – 27 March 2024 
List of Background Papers
 Application and supporting documents via Planning Portal ref CAT/25/0002 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Craig Jardine, Head of Property Services
Ext: 4073  (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk
114

Page 115

13
115

Page 116

116

Page 117

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject:  Carstairs Junction Hall – Community Asset Transfer to
Soul of the Junction SCIO 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the request for the lease of Carstairs Junction Hall to Soul
of the Junction under Community Asset Transfer (CAT) and seek approval to the
principal terms and conditions as set out in Section 5 of the report.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the subjects at Carstairs Junction Community Hall and adjacent car park, 1
St Charles Avenue, Carstairs Junction, Lanark, ML11 8PQ, be leased to Soul of
the Junction subject to the terms and conditions outlined in Section 5 of the report;
and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the lease and enter into the necessary legal agreements
on terms which are in the best interests of the Council. 
[1recs]
3. Background
3.1. Carstairs Junction Community Hall was previously managed by South Lanarkshire
Leisure and Culture (SLLC). However, following a review of its business plan, the
SLLC Board announced in March 2024 that it could not sustain service delivery from
this facility and control was to be returned to the Council. In recognition of the potential
impact upon communities, the Council invited local organisations to express interest
in these properties through CAT, with support from the Community Fightback Fund
(CFF) and the Renewable Energy Fund (REF) to keep facilities open while this process
took place. 
3.2 At the South Lanarkshire Council meeting on 27 March 2024, the Executive Director
(Housing and Technical Resources) obtained approval for Temporary Delegated
Authority to enter into annual arrangements with Community organisations to take
over the management of facilities affected by budget decisions. The annual lease of
the property to the Soul of the Junction was subsequently approved by delegated
powers with a date of entry of 14 November 2024.  
14
117

Page 118

3.3 The organisation subsequently submitted a request for CAT of the facility, based on
a 20-year lease. The validation date for this application was 14 April 2025 and
legislatively a decision is required by 14 October 2025.  Public consultation was
undertaken between 14 April and 4 May 2025, and 4 supporting comments were
received. 
3.4 The request was placed before the Community Asset Transfer Assessment Panel on
30 July 2025 when the following matters were taken into consideration.           
3.5. Property
3.5.1. The asset comprises a single storey timber hall on a brick base with pitched tiled
roof, extending to 257 sq m or thereby.  The property has painted timber single
glazed windows and UVPC rainwater goods.  Internally, floors are timber, walls are
partition and there is electric heating. The accommodation comprises a main hall
with stage, meeting room, kitchen and toilets. The site extends to 1,231 sq. m and
comprises a tarmac car park to the front of the property and grassed areas to the
rear and sides. 
3.5.2  The property is currently used by the applicant as a community hall and café. As
there is no proposed change of use or development, it is not anticipated that
planning consent will be required for continued use. 
3.6. Organisation
3.6.1. The organisation is registered as a SCIO with the office of the Scottish Charitable
Register, having registered this entity on 18 September 2024 (number SC053656).
This organisation was established specifically with a view to progress an asset
transfer. 
3.6.2. The Organisation has been formed for the public benefit of the Community of
Carstairs Junction. Its purpose is the provision of recreational facilities, or the
organisation of recreational activities, with the object of improving the conditions of
life for the persons for whom the facilities or activities are primarily intended.   
3.6.3 The organisation took possession of the premises on 14 November 2024 through a
one-year concessionary lease, although use of the facility was delayed due to storm
damage and repairs being carried out to the venue.
.
3.7. Project
3.7.1. The organisation was established purely for the purpose of potential asset transfer
and has not operated fully to date. Although it has limited experience within the third
sector, the individuals involved have experience in commercial ventures, which
indicates a good capacity to develop and implement the proposed objectives of the
project. The organisation has successfully applied for several grants to assist with
overheads and capital refurbishments. 
3.7.2  A Community Benefit assessment was carried out with a rating of excellent equating
to a 100% discount on the rent. 
4. Assessment
4.1. The property is suitable for the proposed use. Given the track record of the
organisation and the experience gained of managing and operating the facility during
the initial lease, the organisation appears to have the capacity and funds to manage
the facility. 
118

Page 119

4.2. The longer lease will enable the Club to continue to operate the facility and remove
liability for the Council in grounds maintenance. In addition, the sale will allow the
organisation to pursue external funding for the development of the facility. 
4.3. The Council has no alternative operational requirement for the subject. The risks of
the transfer are considered low, as the property is purpose-built, surrounded by land
owned by the Council and the Council will retain ownership of the hall as landlord.
Therefore, it is not considered that the property has any realistic alternative
development potential. 
5. Proposal
5.1. It is proposed that Carstairs Junction Community Hall and adjacent car park, 1 St
Charles Avenue, Carstairs Junction, Lanark, ML11 8PQ, be leased to Albert FC Ltd,
on the following principal terms and conditions:- 
1. the tenant will be to Soul of the Junction 
2. the lease will be for a period of 20 years, with agreed break options
3. the date of entry to be agreed
4. the rent is £1, if asked
5. the lease to be fully repairing and insuring
6. the tenants will pay the buildings insurance costs as charged by the Council
7. the tenants will be required to obtain and exhibit as required public liability
insurance to the value of £5 million for any one claim
8. use – community hall and cafe
9. date of Entry to be agreed
10. the tenants to be responsible for any rates or property charges resulting from
their occupation and use of the subjects
11. assignation and subletting will not be allowed
12. landlord's consent will be required for any structural alterations to the property.
13. each party to bear their own Legal Fees
14. the purchaser will be responsible for obtaining planning and any other relevant
consents relating to the use and any proposed alterations 
6. Employee Implications
6.1. None 
7. Financial Implications
7.1. If the lease outlined in this report is approved by the Committee, it will remove any
liability to the Council for vacant property holding costs. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
9. Other Implications
9.1. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale, if the asset transfer request is refused or the organisation do
not agree with the proposed terms and conditions. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with the Community Participation Team, Legal Services
and Community and Enterprise Resources. 
119

Page 120

10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
18 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Caring, connected, sustainable communities. 
Previous References
♦ South Lanarkshire Council 27 March 2024 -Community Facilities- Temporary
Delegated Authority 
List of Background Papers
♦ None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Jardine, Head of Property Services
Ext: 4073 (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk
120

Page 121

14
121

Page 122

122

Page 123

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Review of the Community Asset Transfer Assessment
and Approval Process 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on refreshed governance arrangements in relation to the
assessment of Community Asset Transfer (CAT) (and associated) Concessionary
Lease applications received by South Lanarkshire Council 
2. Recommendations
2.1. That Committee is asked to approve the following recommendations:- 
(1) that the updated governance arrangements relating to the assessment of
Community Asset Transfer (and associated Concessionary Lease)
applications received by South Lanarkshire Council, as detailed in Appendix 1,
be approved.
3. Background
3.1. Over the past 2 years there has been a significant increase in the number of
enquiries and formal CAT applications received by the Council.  As well as
increasing in number, the operating context for CATs has become more complex,
with applicants often seeking to utilise assets that the Council or South Lanarkshire
Leisure and Culture (SLLC) SCIO are considering disposing of because of budgetary
pressures.   
3.2. Considering this, a review of internal processes for assessing CAT applications and
consideration of Concessionary Leases was conducted by Housing and Technical
Resources.  The focus of this review was to ensure that the approach enabled the
Council to continue to operate in a manner consistent with requirements set out in
legislation and statutory guidance, whilst being reflective of the dynamic environment
in which it operates. 
3.3. As part of the commitment to improving CAT processes, on 2 September 2025 at
Blantyre Community Hub a delegation of council officers met with representatives of
community groups who had been through CAT applications. Led by the Chief
Executive, the Council delegation heard from 8 groups who had been through CATs
between 2016 and 2025, with the general theme being that processes had improved
considerably over that period. While every CAT is different, and some bring up
obstacles that need to be overcome, common areas where further improvements
might be made were agreed, and commitments were made by all parties to continue
to work together to improve processes.
15
123

Page 124

4. Current Approach
4.1. At present, all enquiries are routed through the Council’s dedicated CAT officer who
works with the applicant to ensure that they are:- 
♦ legislatively eligible
♦ have a viable plan
♦ that the land or property in question is not (or is not planned to be) a key part of
the Council’s statutory or non-statutory operations 
4.2. Following the formal consultation period and validation of the application, the CAT
working group, comprising of representatives of the relevant Resources, assess the
collated information from the specific perspective of the Services and meet to
confirm that the application meets legislative standards, identify any gaps and
complete a Community Benefits Assessment. An internal report is then submitted to
a Community Asset Transfer Panel for consideration. This panel consists of the
Head of Property Services, a senior representative from Finance (Strategy) and a
representative of the Community and Enterprise Service. The panel formulate a
decision based on the information contained in the report. 
4.3. Following this, the panel can decide to:- 
1. Recommend that the application is approved - a report will be submitted to the
Housing and Technical Resources Committee seeking approval, or
2. Refuse the application - a response will be sent directly from the Head of
Property Services to the applicant outlining the reasons for the decision.   
4.4. The Council’s standing orders (Terms of Reference -The Council, Committees and
Associated Forums) set out the arrangements for consideration of internal reviews
by elected members via the Asset Transfer Panel (a sub-committee of the Housing
and Technical Resources). Applicants also have a further right of appeal to Scottish
Ministers should they be dissatisfied by the decision of the Council’s internal review. 
4.5. If approved by Committee, terms are offered to the applicant body who can choose
to accept them or formally request a local appeal through the Asset Transfer Panel,
or directly to Scottish Ministers if they are of a view that the terms offered by the
council differ greatly from their expectation. 
4.6. Once notified of the decision, the applicant has a period of 20 working days to
request an internal review by the Council.   
4.7. When a proposed CAT does not meet the required criteria, consideration is given to
enabling the continued use of the building through a Concessionary Lease for an
agreed period. This is based on the principle that this may allow time for the
applicant to get themselves into a position where they meet the criteria for a CAT. 
4.8. Where the initial CAT application is converted to a Concessionary Lease, the
approach to scrutiny and approval of applications is the same as that noted above
for CATs. However, lease arrangements do not have statutory right to appeal.  
124

Page 125

5. Refresh of approach and governance arrangements
5.1. With the aim of ensuring the Council’s approach continues to align with statutory
guidance and to further improve transparency in the context of continuing high levels
of applications, the following immediate actions have been made:- 
♦ A refresh of the report template used for progressing applications through
Housing and Technical Resources Committee, ensuring clarity on what is being
recommended and the required steps that officers have taken to reach that
recommendation in line with statutory guidance. 
♦ Removal of the terminology and references to ‘CAT Lite’ from any future
discussions and reporting. The CAT Lite approach was established in 2023/2024
as a mechanism to mitigate proposed asset savings across the Council and no
formal governance arrangements exist to ensure it is appropriately applied.
Focus will instead revert to “concessionary leasing” as a potential option should a
full CAT application not be appropriate. This is considered to more accurately
reflect the transaction and avoid the implication that the Concessionary Lease is
essentially a staging post to a full CAT, with the application and approval process
for the Concessionary Lease being the same, requiring formal approval. 
♦ Recognising the role of Concessionary Leases in supporting groups to prepare
for a full CAT application, flexibility will now also be given to their duration. 12-
month leases are often not long enough for groups to prepare and apply formally,
and by offering flexibility this will encourage and support those who need
additional time. The length of lease offered will be determined in conjunction with
the community group and reported to the panel (and Committee) for
consideration. 
5.2. The review identified that it would be beneficial to strengthen the arrangements for
consideration of CATs and in particular the role and membership of the CAT Panel.
A key focus of this would be to ensure appropriateness of group representation and
clarity in terms of the role of relevant services across the Council to enable a
thorough assessment of each application.  This includes:- 
♦ formalising an initial assessment of each application by the CAT Officer and the
Estates and Assets Manager
♦ refining the current approval route of applications to minimise the risks associated
with the applicants suggesting the Council has not acted in accordance with its
statutory functions or within the guidance
♦ expansion of the appraisal to ensure systematic consideration of whether there
are reasonable grounds for refusal, including as to whether:-
♦ the benefits of the asset transfer request are judged to be less than the
benefits of the status quo, (that is, continued operational use) or an alternative
proposal
♦ the request would restrict the Council’s ability to carry out its functions
♦ another obligation on the Council prevents or restricts its ability to agree to the
request 
As part of these considerations, budgetary implications to the Council will be
considered across each area:- 
♦ Terms of Reference, including membership, being established for the CAT
Working Group, providing detail as to the remit of the Chair, each member and
the Resource or Service they represent
125

Page 126

♦ clear Terms of Reference being established for the Panel, providing detail as to
the role of the Chair, each member and the Resource or Service they represent.
The role of the Asset and Estates Manager will also be defined, enabling them to
present recommendations and key considerations
♦ refreshed membership of the Panel, ensuring appropriate representation from
across each Council Resource. Suggested membership is detailed in the Terms
of Reference attached at Appendix 1
♦ establishing a standardised approach for the Housing and Technical Resources
Resource Management Team to consider the application based upon
recommendations of the Panel prior to submission to Committee
♦ formalising the approach to informing and updating local elected members of
CAT applications for their ward, confirming the basic details of the application and
the process through which the Council will determine the application 
5.3. As required by the Scottish Government guidance (Asset Transfer Guidance for
Relevant Authorities, Paragraph 10.11) when comparing the benefits of other
proposals to the benefits of an asset transfer request, the benefits of the other
proposals will be considered on the same basis as those used for the asset transfer
request. 
6. Next Steps
6.1. Subject to approval from the Committee, the refreshed governance arrangements
within this report, alongside an overview of recent CAT and Concessionary Lease
activity, will be implemented. 
7. Employee Implications
7.1. There is no employee implications associated with this report. 
8. Financial Implications
8.1. There are no financial implications associated with this report. All CAT or
Concessionary Lease applications received are individually assessed, with any
financial implications for the Council considered as part of this process. 
9. Climate Change, Sustainability and Environmental Implications
9.1. This report does not currently introduce a new policy, function or strategy which
impacts the natural environment, climate change or sustainability. 
10. Other Implications
10.1. There are no other implications associated with this report. All Community Asset
Transfer or Concessionary Lease applications received are individually assessed,
with all implications for the Council considered as part of this process. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not currently introduce a new policy, function or strategy which
requires the completion of an Integrated Impact Assessment or wider consultation. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
11 September 2025 
126

Page 127

Link(s) to Council Values/Priorities/Outcomes
♦ Focused on people and their needs
♦ Working with and respecting others
♦ Accountable, effective, efficient, and transparent
♦ Ambitious, self-aware, and improving
♦ We will work to put people first and reduce inequality
♦ We will work towards a sustainable future in sustainable places
♦ Good quality, suitable and sustainable places to live
♦ Caring, connected, sustainable communities
♦ People live the healthiest lives possible 
Previous References
♦ None 
List of Background Papers
♦ None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Craig Jardine, Head of Property Services
Ext: 4073  (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk 
127

Page 128

Appendix 1 
Community Asset Transfer Panel (CATP) Terms of Reference 
Membership 
Members Resource
Community
Asset Transfer
Panel 
Head of Property Services (Chair) HTR
Finance Manager (Strategy) FCR
Legal Services Representative   FCR
Community Engagement Manager FCR
Partner Liaison Manager CE
Assets and Estates Manager (attendee) HTR 
Role of Panel 
♦ To consider applications for Community Asset Transfers and Concessionary Leases 
♦ To make recommendations to the Executive Director (Housing and Technical
Resources) as to whether an application should be approved or declined,
recommending any conditions or qualifications that should be applied as appropriate. 
Remit 
1. A report will be provided to the Community Asset Transfer Panel (CATP) by the Asset
and Estates Manager which will provide a recommendation as to whether an application
should be approved or declined, detailing any conditions or qualifications that should be
applied. 
2. This report will confirm the outcome of an assessment of the submission for CAT
against the requirements outlined in the Community Empowerment (Scotland) Act 2015
and associated statutory guidance. 
3. In advance of meetings of meetings of the Community Asset Transfer Panel (CATP), the
chair will circulate copies of the assessment of applications, including a community
benefits assessment for transfer of a council asset for review. This will outline whether
agreeing to the application would be likely to promote or improve: 
♦ economic development
♦ regeneration
♦ public health
♦ social wellbeing
♦ environmental wellbeing, or
♦ reduce inequalities of outcome which result from socio-economic disadvantage 
4. The report will also detail whether the: 
♦ the benefits of the asset transfer request are judged to be less than the benefits of
an alternative proposal, 
♦ the request would restrict the council’s ability to carry out its functions, or
♦ another obligation on the council prevents or restricts its ability to agree to the
request 
Cost implications to the council to facilitate the request may also require to be
considered as part of the above. 
128

Page 129

5. At the scheduled CATP meeting, members will consider the report by Asset and Estates
Manager, and
♦ confirm that the report evidences whether:
♦ the group is eligible for a CAT 
♦ the proposal is viable 
♦ the application conflicts with any current or future plans for the site which are
assessed as providing greater benefit, and
♦ the group has the capacity and financial ability to progress the transfer and
deliver the prosed service.
♦ Make a recommendation to the Executive Director of Housing and Technical
Resources as to whether the application should be approved or rejected. 
6. The CATP will seek to establish agreement by consensus, however, if agreement
cannot be reached on an application, this will be reported by the chair to the Executive
Director of Housing and Technical Resources along with a summary of the views of the
panel. The Executive Director will then decide as to whether, and on what basis the
application should be approved. 
7. In relation to Concessionary Leases the report by the Asset and Estates Manager will
note 
a. whether the group has noted an interest in a pursuing a CAT or have an ambition /
intention to do so in the future, 
b. the reason they are considered ineligible for a CAT at this point 
NB Organisations who have advised that they have no interest in a Community
Lease will be assessed solely against statutory CAT requirements. 
8. Applications for a Concessionary Lease will be considered by the panel on a similar
basis as that noted at 1 to 7 above for formal Community Asset Transfers. 
129

Page 130

130

Page 131

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Report - Mainstreaming Equality and Diversity
within Housing and Technical Resources 
1. Purpose of Report
1.1. The purpose of the report is to:- 
♦ provide an overview of progress made in relation to mainstreaming equalities
within Housing and Technical Resources during 2024/2025
♦ highlight the key actions to be progressed during 2025/2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the progress made during 2024/2025, and key actions for 2025/2026 in
relation to mainstreaming equalities, be noted. 
3. Background
3.1. The Housing and Technical Resources Equality and Diversity Coordination Group
(EDCG) has responsibility for ensuring that the Resource’s Equality and Diversity
work plan is progressed, that a consistent approach is taken to mainstreaming
equality and diversity across the Resource and that work undertaken links to the
wider corporate equalities’ agenda.   
3.2. The range of work being carried out across the Resource in relation to
mainstreaming equality and diversity is reported on an annual basis, with the last
report for 2024/2025 presented to Housing and Technical Resources Committee on
27 November 2024. 
3.3. This report provides details of the activities progressed during 2024/2025, whilst
setting out the key priorities to be progressed during 2025/2026. 
4. National and Local Policy Developments
4.1. New Housing Bill 
The Housing (Scotland) Bill was published by the Scottish Government in March
2024 and aims to support delivery of Housing to 2040 and ‘A New Deal for Tenants’.
The main objectives of the Bill are to prevent homelessness and strengthen tenants’
rights through:- 
♦ the introduction of an ‘ask and act’ duty on social landlords and other bodies,
such as health boards and police, to ask about a person’s housing situation, and
act to avoid them becoming homeless wherever possible
16
131

Page 132

♦ reform of provision for people threatened with homelessness up to 6 months
ahead, including provision for tenants experiencing domestic abuse
♦ other proposals relate to the private rented sector and include long term rent
controls for private tenancies, new rights to keep pets, decorate rented homes
and stronger protection against eviction 
The Resource has coordinated various consultations and calls for views in relation to
the Bill and submitted a response to the most recent consultation, relating to rent
controls and termination of joint tenancies in the private sector, in July 2025. 
Progress in relation to the Bill continues to be monitored.  It is expected that the final
Stage 3 process will take place after the Parliamentary summer recess, with Royal
Assent in Autumn and approval of regulations for key parts of the Bill no earlier than
November 2025. 
The Resource will effectively respond to any changes required to housing policy and
practice locally to ensure alignment with the provisions detailed within the Bill. 
4.2. Public Sector Equality Duty 
The Public Sector Equality Duty requires public bodies to set out, monitor and report
on Equality Outcomes to address human rights and inequalities at four yearly
intervals.   
The Equality Outcomes for the Resource for the period 2021 to 2025 focussed on
homelessness with the headline Equality Outcome being ‘Prevent homelessness
occurring and significantly reduce homelessness’, with specific actions and
measures aligned to the Local Housing Strategy (LHS) 2022 to 2027 and Rapid
Rehousing Transition Plan 2019 to 2024 (RRTP). 
Between January and March 2025, the Resource undertook a review of its Equality
Outcomes to determine the priorities for the 4-year period, 2025 to 2029. 
Considering current national and local priorities, it was agreed that the focus would
remain on homelessness, with a revised headline Equality Outcome ‘Prevent
homelessness occurring wherever possible thus reducing its impact’. Revised
actions and measures to support delivery of the revised Equality Outcome continue
to align with the LHS 2022 to 2027 and the Homelessness Strategic Action Plan,
which replaced the RRTP.     
The final progress report on the Council’s 2021 to 2025 Equality Outcomes as well
as the new Equality Outcomes for 2025 to 2029 has been published and is available
to view on the Council’s website.     
4.3. Integrated Impact Assessment 
During 2024/2025, a new Integrated Impact Assessment (IIA) was introduced across
the Council. 
The new IIA aims to ensure compliance with statutory and non-statutory duties and
incorporates Equality Impact and Fairer Scotland Duty assessments as well as
considerations in relation to human rights, children and young people’s rights, the
Consumer Duty, sustainability and the Armed Forces Covenant Duty, as part of
policy/strategy development processes.     
During 2024/2025, the Resource undertook a range of Integrated Impact
Assessments, with details of these provided at Appendix 1.
132

Page 133

4.4. South Lanarkshire Progressive Housing Framework 
On 8 May 2024, a report was presented to Executive Committee highlighting the
development of the South Lanarkshire Progressive Housing Framework and
detailing arrangements for the implementation of the Framework. 
Progressive Housing is an approach which reflects the council’s response to
people’s changing housing, support and care needs over the course of their lives. It
aims to promote independent living through re-focusing operating models in relation
to the types of accommodation provided, the location of new housing sites, the way
care is provided, and the level of support that is delivered.
A key aspect of progressive housing has been the development and roll-out of the
Home and Health Assessment Service (HHAS), which was introduced on 1 April
2024.  Delivered jointly by housing and the Occupational Therapy Service, the
service takes a holistic approach to assessing medical applications for housing,
ensuring that the applicant’s health needs and housing circumstances are fully taken
account of to allow a more accurate assessment to be carried out. 
It aims to help people to remain within their existing home, however where this is not
possible, an appropriate level of priority is awarded under the Housing Allocation 
Policy to help them move to a more suitable home.   
The Progressive Housing approach builds on existing joint working and aligns with
wider ambitions of the Resource and SLUHSCP as set out within key strategic
documents including:- 
♦ The Local Housing Strategy 2022 to 2027
♦ The Strategic Commissioning Plan 2025 to 2028
♦ The Strategic Housing Investment Programme (SHIP) 2025 to 2030 
5. Key Areas of Progress 2024/2025
5.1. Key highlights in relation to mainstreaming equalities for Housing and Technical
Resources during 2024/2025 include:- 
♦ 180 homes (50 new build and 130 properties bought through the council’s Market
Purchase Scheme) delivered through the Council’s Affordable Housing Supply
Programme, with a continued focus on ensuring that homes are accessible to
meet a variety of current and future needs. Of the 50 new build council homes
delivered, eight (16%) were wheelchair accessible properties, exceeding the 10%
target set within the Local Housing Strategy 2022 to 2027
♦ 862 homes adapted to support people with health conditions or disabilities to
continue to live independently within their existing homes, without the need for
rehousing or moving to a care setting
♦ development and implementation of the Homelessness Strategic Action Plan for
2024/2025, with specific actions and measures to help address the continued
pressures and demands on homelessness services, while focussing on
preventing and alleviating homelessness
♦ the successful delivery of the first year of the new Home and Health Assessment
Service. This service ensures a more holistic approach to the assessment of the
medical aspect of housing applications and is a key aspect of the Progressive
Housing Framework
133

Page 134

♦ continued provision of tenant-led site improvements and services to the
Gypsy/Traveller community, including, the installation of solar panels at both
sites, the commencement of amenity unit extensions at Shawlands Crescent and
engagement with residents of Springbank Park on the design of a new play area
♦ to support the objectives of The Promise Scotland, the Resource continued to
work in partnership with other Council Resources and key agencies to prevent,
where possible, children and young people entering the care system, and to
better support care experienced children and young people.  The Promise aims
to ensure that care experienced children and young people grow up loved, safe
and respected with better life chances as they progress into adulthood
♦ the continued development of services for sheltered housing tenants including
the expansion of digital inclusion, promoting technology enabled care (TEC)
initiatives to support independent living and ensuring the service is well prepared
for the upcoming analogue to digital switchover of telephone land lines and
dispersed alarms
♦ delivery of the fourth bi-annual sheltered tenants conference which was attended
by around 150 sheltered housing tenants
♦ continued partnership working with the South Lanarkshire Autism Strategy Group
and the Autism Resources Co-ordination Hub (ARCH) to raise awareness and
deliver improved housing pathways for individuals and families affected by autism
and other forms of neurodivergence 
5.2. Further details on the above and other areas of work progressed by the Resource in
relation to mainstreaming equalities during 2024/2025 can be found in Appendix 1. 
6. Consultation, engagement and customer feedback
6.1. As part of the Resource’s annual consultation programme and in addition to the
broader programme of engagement, officers continued to work closely with a range
of equalities groups and stakeholders including:- 
♦ Disability Partnership Housing Subgroup 
♦ South Lanarkshire Access Panel 
♦ Residents of the council’s two Gypsy/Traveller sites
♦ Sheltered housing tenants 
♦ People with lived experience of homelessness
♦ Veterans/Armed Forces Community
♦ Care-experienced young people
♦ Seniors Together South Lanarkshire 
♦ Violence Against Women and Girls Strategic Partnership 
♦ South Lanarkshire Autism Strategy Group
♦ See Hear Strategic Working Group 
♦ Financial Inclusion Network Digital Inclusion Sub-group
♦ South Lanarkshire Youth Council 
♦ Bord-na-Gaidhlig 
During 2024/2025, the Resource continued to work in partnership with these
stakeholder groups to support the development, review and implementation of key
housing services and policies/strategies, including the review of the Housing Repairs
Policy. 
7. Complaints
7.1. During 2024/2025, there were no complaints recorded by the Resource under the
Equalities category.
134

Page 135

8. Employee Learning and Development  
8.1 During 2024/2025, Resource employees participated in a total of 1098 equality and
diversity related e-learning activities. These are listed below:- 
♦ Age Discrimination (9)
♦ Autism Awareness (3)
♦ Challenging Ageist Stereotypes (8)
♦ Communicating with People who are D/Deaf (9)
♦ Deaf Awareness (10)
♦ Disability Awareness (89)
♦ Equality and Diversity Awareness (179)
♦ Forced Marriage (9)
♦ Gaelic and Scotland (3)
♦ Gender Reassignment (99)
♦ LGB&T People and Public Services (4)
♦ Marriage and Civil Partnership (101)
♦ Race Discrimination (103)
♦ Religion and Belief (3)
♦ Sex Discrimination (97)
♦ Sexual Orientation (95)
♦ Sight Loss Awareness (3)
♦ Transgender Awareness (96)
♦ Unconscious Bias (178) 
The programme of equalities training continues to be rolled out by Employee
Development on an ongoing basis.  Specific training opportunities for Housing and
Technical Resources staff will also continue to be identified by the Resource and
delivered as required.   
9. Key Priorities for 2025/2026
9.1 The Resource Equality and Diversity Coordination Group (EDCG) will continue to
oversee and progress work in relation to mainstreaming equality across Housing and
Technical Resources during 2025/2026. 
9.2 Key priorities for the Resource during 2025/2026 will include:- 
♦ track the Housing (Scotland) Bill as it progresses through Parliament, ensuring
that the Resource responds timeously and appropriately to any new requirements
arising from the Bill
♦ continue to take forward a range of actions to support delivery of the Resource
Equality Outcomes 2025 to 2029, with a specific focus on preventing
homelessness where possible and reducing its impact
♦ undertake Integrated Impact Assessments for all new or revised policies and
strategies, as outlined in the Policy Review Schedule for 2025/2026
♦ continue the programme of consultation and engagement with a range of equality
groups to help shape housing services and practice and ensure they remain
inclusive for everyone.  This will include consultation on the review of the Housing
Allocation Policy and Gypsy/Traveller Pitch Allocation Policy
♦ implement the Council’s Affordable Housing Supply programme to increase the
supply and choice of council homes across South Lanarkshire
♦ continue to deliver adaptations in both council and private homes to support
independent living for older people and those with disabilities
135

Page 136

♦ ensure delivery of the Homelessness Strategic Action Plan for 2025/2026
♦ continue the programme of engagement with Gypsy/Travellers to deliver the
2025/2026 site masterplans, including the installation of the new play area at
Springbank Park and amenity unit extensions at Shawlands Crescent
♦ continue to work in partnership with other agencies to deliver the aims and
objectives of ‘The Promise’ and improve outcomes for care experienced children
and young people
♦ Through the Care Inspectorate quality assurance framework, take forward a
range of initiatives to improve service delivery, promote health and wellbeing and
support independent living for sheltered housing tenants
♦ working in partnership with the Autism Resources Co-ordination Hub (ARCH),
deliver a suite of training for Housing and Property Services staff to raise the
profile of autism and other forms of neurodivergence 
10. Next steps
10.1 Housing and Technical Resources will continue to implement and progress the wide
range of work to support mainstreaming equality across its housing and
homelessness services during 2025/2026. 
10.2 Reporting arrangements for progress during 2025/2026 include to the:- 
♦ Resource Management Team
♦ Parent Joint Consultative Council
♦ Housing and Technical Resources Committee 
♦ Employee, Equalities, Diversity and Inclusion Forum 
11. Employee Implications
11.1 There are no employee implications associated with this report. 
12. Financial Implications
12.1 There are no financial implications associated with this report. 
13. Climate Change, Sustainability and Environmental Implications
13.1 This report does not introduce a new policy, function or strategy which impacts on
the natural environment, climate change or sustainability. 
14. Other Implications
14.1 There is a risk to South Lanarkshire Council should the Resource not comply with
the relevant equalities’ duty and legislation. 
14.2 The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement to the Scottish Housing Regulator. 
15. Integrated Impact Assessment and Consultation Requirements
15.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment or formal consultation is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
17 September 2025 
136

Page 137

Link(s) to Council Values/Priorities/Outcomes
♦ Focused on people and their needs
♦ Working with and respecting others
♦ Accountable, effective, efficient and transparent 
♦ Ambitious, self-aware and improving
♦ Fair, open and sustainable
♦ We need to put people first and reduce inequality
♦ We need to progress and improve
♦ We need to work towards a sustainable future in sustainable places
♦ Caring, connected, sustainable communities 
♦ People live the healthiest lives possible 
♦ Our children and young people thrive
♦ Good quality, suitable and sustainable places to live 
Previous References
♦ Housing and Technical Resources Committee, 27 November 2024, Mainstreaming
Equality and Diversity within Housing and Technical Resources 
List of Background Papers
♦ Housing (Scotland) Bill (The Scottish Government – 26 March 2024)
♦ South Lanarkshire Rapid Rehousing Transition Plan 2019 to 2024
♦ South Lanarkshire Equality Outcomes Final Report 2021 to 25
♦ South Lanarkshire Equality Outcomes Report 2025 to 29
♦ South Lanarkshire Local Housing Stratgey 2022 to 2027
♦ South Lanarkshire Strategic Commissioning Plan 2025 to 2028
♦ Strategic Housing Investment Programme (SHIP) 2025 to 2030
♦ Homelessness Strategic Action Plan 2025/2026 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact: 
Cameron Mitchell, Strategy and Support Manager
Tel: 01698 454862
E-mail: Cameron.mitchell@southlanarkshire.gov.uk 
137

Page 138

APPENDIX 1 
KEY AREAS OF PROGRESS 2024/2025
Affordable Housing Supply Programme
During 2024/2025, a total of 180 additional affordable homes for social rent were delivered
by the Council.  This included 50 new build homes and 130 properties acquired through the
Council’s Market Purchase Scheme. In delivering the new build housing programme, the
Resource delivered eight wheelchair accessible homes, which accounted for 16% of all 
new build homes delivered. This is above the 10% target set within the Local Housing 
Strategy 2022 to 2027. 
All new homes within the programme meet the housing for varying needs standard and are
‘future proofed’, meaning they are designed in such a way that they can be easily adapted
to meet the specific needs of a wide range of customers now and in the future.   
Adaptations Programme
During 2024/2025, a total of 862 homes were adapted to support people with health
conditions or disabilities to continue to live independently within their own homes, without
the need for rehousing or moving to a care setting. 
Housing and Homelessness
The fifth and final annual review of the Rapid Rehousing Transition Plan (RRTP) was
reported to Housing and Technical Resources Committee on 18 September 2024 together
with a new Homelessness Strategic Action Plan for 2024/2025.   
During 2024/2025, the operating context in relation to homelessness, locally and nationally
continued to be challenging, with sustained pressures and demands on homelessness
services.   
The Homelessness Strategic Action Plan continues to focus on the priority objectives
detailed within the RRTP, while also detailing a range of high-level actions identified to
address system pressures. 
Despite the extremely challenging context, the following progress was secured: 
• a continued strong focus on partnership working to deliver homelessness prevention
and tenancy sustainment services. 
• close partnership working to develop the Strategic Commissioning Plan 2025 to
2028. 
• a continued focus on early detection of housing risk factors and interventions to
prevent homelessness where possible, through the Integrated Housing Options
model. Despite an increase in the demand for the service, over half of advice cases
were closed with support being provided, preventing homelessness from occurring.
• fifteen temporary tenancies were flipped to a Scottish Secure Tenancy, taking the
total to 132 since the approach was introduced in 2019/2020.
• 92% of homeless households who were provided with a home, sustained their
tenancy for more than 12 months.  
• continuation of Housing First, with just over 40 households having now been
supported through the programme.
• the continuation of the positive Personal Housing Planning approach for vulnerable
groups including women experiencing domestic abuse, care leavers and people
leaving prison.
• implementation of SLC Futures project in partnership with Barnardo’s and Social
Work Resources to assist care experienced young people transition successfully into
138

Page 139

independent living. 
The Council and its partners have a strong history of delivering effective homelessness
services and the partnership remain committed to continuing to work together to prevent
and alleviate the impact of homelessness.  
Launch of the Home and Health Assessment Service
Following a successful test of the model and approach, the new Home and Health
Assessment Service was launched in April 2024.   
The service provides a more effective assessment of the health/medical aspect of housing
applications and is a key aspect of the Progressive Housing Framework. 
The service is delivered jointly by Housing Services and the South Lanarkshire University
Health and Social Care Partnership’s Occupational Therapy Service and aims to assist
people to remain in their existing home where it is appropriate for them to do so.  Where
this is not possible, a level of priority is awarded under the Housing Allocation Policy to help
them to move to a more suitable home. 
Over the course of the year, the service was fully embedded and provided a range of
positive outcomes for applicants.  The proportion of applicants awarded the highest level of
medical need doubled from 3.5% under the previous service model, to 7%, demonstrating
the effectiveness of the new service in identifying those in the greatest level of need.  
465 applicants moved to medically suitable properties, following an award of medical
priority, including 53 applicants assessed as having the highest medical need.
In addition, 21 applicants were supported to remain in their own home through the provision
of equipment and/or adaptations. 
To support delivery of the new service, local housing teams applied an enhanced approach
to managing enquiries relating to medical priority.  This ensures that applicants are fully
aware and understand the policy position, allowing them to make an informed decision on
whether to apply for medical priority.  As a result of this approach, there has been a 38%
reduction in the number of applications for medical priority received.   
Gypsy/Travellers
Throughout 2024/2025, the Resource continued to ensure the appropriate provision of
services to residents of South Lanarkshire Council’s two Gypsy/Traveller sites. 
This includes the latest phase of the resident-led site masterplans, delivering projects
prioritised by residents to make significant improvements to accommodation and communal
facilities on both sites, with investment from the council’s Housing Revenue Account, the
Scottish Government’s Gypsy/Traveller Accommodation Fund, and the Scottish
Procurement Alliance. 
Progress during the year included the planned programmes of amenity unit extensions at
Shawlands Crescent, installation of solar panels and batteries at Shawlands Crescent and
Springbank Park, and upgrades to meters at Shawlands Crescent. 
The installation of a play area at Springbank Park, co-designed with site residents, is
underway and anticipated to be completed during 2025/2026. 
Support to Care Experienced Children and Young People 
To support the objectives of The Promise, during 2024/2025 the Resource worked in
partnership to implement a number of initiatives to prevent where possible, children and
139

Page 140

young people entering the care system, and to better support children and young people
experiencing care. This included: - 
• Breaking the Cycle team continued to support families with children to improve
parenting skills, address anti-social behaviours, identify and address risk, sustain
accommodation, maximise opportunities in relation to income and connect to
community networks, with successful outcomes reported.
• Delivery of the Housing Services and Social Work Resources continuing care protocol.
Throughcare Housing Officer provides monthly ‘drop-in’ advice and assistance
sessions to care-experienced young people in relation to housing matters, which has
proved an extremely popular and valuable resource. 
• Homelessness advice YouTube video link circulated to all South Lanarkshire high
schools for distribution to students during Personal Social Education classes.
• SLC Futures Project successfully supported care experienced young people to
transition into independent living. The Project is delivered in partnership with Social
Work and Barnardo’s and provides an opportunity for young people leaving care to
experience independent living in a transition flat supported by Barnardo’s before
moving onto a permanent home of their own.  Due to the success of the Project, a
further four transition flats will be established during 2025/26.
• Continued to commission specialist support from third sector to meet multiple and
complex support needs, including Housing First approach. 
Support to Victims of Domestic Abuse
The Resource has a well-established person-centred housing pathway approach for people
experiencing domestic abuse.  The pathway considers options to support victims that can
include agency support and safety planning to remain in their current accommodation or
provision of housing advice, should they wish to move to a different location.   
During 2024/2025, there were 33 contacts in this category, resulting in 15 housing
pathways being completed, 11 being provided with extensive housing advice and
signposting, two were assisted to make a homelessness presentation and five cases did
not engage with the process. 
Refugee Resettlement Programme 
Since December 2015 to the end of March 2025, 77 families (282 individuals) have been
settled across South Lanarkshire through the UK Refugee and Afghan resettlement
programmes, supported by specialist Support Officers from the Asylum and Refugee
Resettlement Team.   
Support for Ukrainian arrivals following the start of the Ukrainian conflict in 2022 has been
provided to resettle 92 families (232 individuals) in communities across South Lanarkshire.
A further 266 guests have been welcomed by 324 hosts in the area since 2022.  An
additional 239 Ukrainians have been supported in interim accommodation as a move on
option from Scottish Government led ‘warm welcome’ hotel provision. 
Officers from the Resource’s Asylum and Refugee Resettlement Team continues to work
closely with Youth, Family and Community Learning Officers (ESOL), within Education
Resources, enabling individuals to access opportunities, positively engage with employers,
communities and develop English language skills.     
Asylum Dispersal
During 2024/2025, the Resource continued to work with a range of internal and external
partners to support the implementation of the UK Government’s proposals to widen
dispersal of asylum seekers.  This work included ensuring the council is represented at
national meetings and contributes effectively to ongoing discussions and liaison with the UK
140

Page 141

Government’s Asylum Accommodation and Support Provider and other agencies, in the
identification of suitable accommodation options within South Lanarkshire.   
Sheltered Housing 
During 2024/2025, the sheltered housing service continued to ensure the delivery of high-
quality services to sheltered housing tenants through a range of initiatives which included: - 
• Continued to promote digital inclusion for tenants, supported by the service’s Digital
Champions.  
• Promoted technology enabled care initiatives for tenants, including the use of
technology and the benefits of wearables for health and wellbeing and falls
prevention, whilst also ensuring the service is well prepared for the upcoming
analogue to digital switchover of telephone land lines and dispersed alarms.  
• Delivered a range of initiatives for tenants living with dementia to support independent
living including dementia awareness training for all sheltered housing staff and
dementia-friendly design principles within sheltered developments.  
• Worked jointly with partners including, Scottish Fire and Rescue Service, Police
Scotland and Trading Standards to help ensure the safety interests of tenants were
protected.  
• Delivery of the fourth sheltered tenants conference.  This event brought together
around 150 tenants from across the service creating a wider sense of community and
providing an opportunity for tenants to meet new people and learn about how to
improve their health and wellbeing.  
• Continued to produce the dedicated sheltered housing newsletter, keeping tenants up
to date with local and strategic news.  This included an audio version of the publication
to help ensure the needs of tenants living with visual impairment were met.   
These actions alongside the day-to-day service provision led to 96% of sheltered housing
tenants who responded to a survey stating that they were either very satisfied or satisfied
with the quality of the housing support they receive. 
South Lanarkshire Autism Strategy
During 2024/2025, the Resource continued to contribute to the work of the Council’s
Autism Strategy Group to help support delivery of the South Lanarkshire Autism Action
Plan.   
Building on the success of Autism Awareness training rolled out to Housing and Technical
Resources staff in 2023/2024, during 2024/2025, an Autism Awareness Toolbox Talk was
rolled out to all Building Services Operatives.  As part of the Toolbox Talk, Operatives were
issued with an at-a-glance pocket-sized card, offering practical tips and advice for
communicating with people with autism and other forms of neurodivergence. This was
considered useful for tradespersons when working in tenant’s homes.   
The Resource continued to receive a steady flow of referrals from the Autism Resources
Co-ordination Hub (ARCH) in relation to individuals and families affected by autism and
other forms of neurodivergence with particular housing needs. Working closely with local
housing offices, a number of successful housing outcomes were delivered for service users
following referrals from ARCH.  This ranged from the provision of housing options advice to
re-housing families to more suitable property types.     
Armed Forces Covenant 
During 2024/2025, the Resource continued to support delivery of the Armed Forces
Covenant.   Building on the principles of the current Housing Allocation Policy which makes
provision for Veterans, the Resource continued to implement the Veterans / Armed Forces
housing enquiries tracker to help ensure that housing issues pertaining to this equality
141

Page 142

group were resolved as quickly as possible.  A total of eight cases were supported during
2024/2025.   
A service development session on the Covenant and “due regard” was also rolled out to
staff across Housing Services.   
Hospital Discharge 
Working in partnership with colleagues in NHS Lanarkshire, the Resource continued to
implement the joint hospital discharge tracker and protocol.  During 2024/2025, a total of
eight cases were supported.  This helped ensure that tailored housing advice was provided
to people ready to be discharged from hospital, assisting them to return to their homes as
quickly as possible whilst also reducing hospital ‘bed blocking’.   
Accessibility
During 2024/2025, the Resource continued to work in partnership with the South
Lanarkshire Disability Partnership Housing Subgroup and the Access Panel.  A key aspect
of this was working in consultation with both groups on the accessibility aspects of council
homes and buildings, as well as key housing policies and strategies.     
Integrated Impact Assessment 
Following the roll-out of the new Integrated Impact Assessment (IIA) during 2024/2025 (as
detailed at 4.3), the Resource undertook a range of IIAs for new and revised policies 
and strategies as a means of mitigating potential inequalities. These were in respect of: - 
♦ Scheme of Assistance 
♦ Housing Revenue and Capital Account Budget 2025/2026
♦ Proposed Financial Savings 2025/2026 
♦ Local Letting Plans 2025/2026
♦ Housing Repairs Policy 2025 to 2030
♦ Strategic Housing Investment Plan (SHIP) 2025 to 2030 
Translation and Interpretation Services 
The Resource continued to provide a range of translation (written) and interpretation
(verbal) services to customers with specific communication requirements, including sign
language provision and translation of documents such as tenancy agreements.  These
services have helped to make housing services more inclusive for people whose first
language is not English.     
142

Page 143

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Update of the Housing and Technical Resources' Risk
Register 
1. Purpose of Report
1.1. The purpose of the report is to:-[purpose] 
 present an update on the Risk Register for Housing and Technical Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
]
(1) that the content of the Resource Risk Register following review, as detailed at
Appendix 1, be noted.
[1recs]
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision-making processes.  The strategy requires Resources
to record and review risks and control actions regularly.  Housing and Technical
Resources follow the guidance in developing, monitoring, and updating the risk
register on an ongoing basis. 
3.2. The Council’s updated Risk Management Strategy was rolled out via a Management
Bulletin with an effective date of 1 April 2025.   
3.3. The purpose of the register is to ensure that the Resource is fully aware of its top
risks; that these risks are prioritised; and that controls are in place to eliminate or
minimise the impact of the risks. 
3.4. The Resource scores the risks in accordance with the Council scoring mechanism,
based on likelihood and impact.  This results in risks being scored between one and
twenty five (low to very high). 
3.5. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls).   
3.6. The last update of the Housing and Technical Resources’ Risk Register was
reported to the Committee on 27 November 2024. 
3.7. The Resource’s top risk register has been reviewed.  This work was completed in
September 2025.  
17
143

Page 144

3.8. The Central Risk Management team annually review Resource compliance with the
Risk Management Strategy.  The outcome of the 2024/2025 review identified that
Housing and Technical Resources achieved 100 per cent compliance, scoring 45 out
of a possible 45. 
4. Resource Risk Management
4.1. Each Resource has a Resource Risk Management Group which has responsibility
for the promotion and management of risk.   
4.2. The Housing and Technical Resources Risk Management Group continues to
consult on a regular basis.   
4.3. The work of the group over the last year has focused on the review and update of
the Resource Risk Register and ensuring that the register reflected the Council Plan
and individual Service Plans.   
5. Risk Register
5.1. Work has been completed by the Resource Risk Group to finalise the review of the
Resource Risk Register.  The update considered risks at a Service level, as well as
strategic council risks. 
5.2. The Resource Risk Register will be monitored on an ongoing basis to allow new
risks to be added and for the control measures and scores of the existing risks to be
reviewed considering new information.   
5.3. Risks can result from internal or external influences, with examples being the impact
of projected funding cuts, legislative changes, or the impact of internal service
changes. 
5.4. The development process for the Resource Plan requires a risk assessment process
to be undertaken as appropriate resulting in some actions within the Resource Plan
having a corresponding risk identified within the risk register.   
5.5. The main changes to the register are summarised below: 
 Risks consolidated
Table 1 details risks that have been consolidated this year, given they are closely
related.  The new risk wording is intended to cover all types of civil emergency
rather than a specific pandemic/endemic event. 
Table 1 – Consolidated Risks
2024 Risks 2025 Risk
• Failure to fulfil emergency
response commitments befitting
the Council’s status as a
Category One (emergency)
responder
• The Council does not have the
appropriate emergency /
business continuity plans;
contingency arrangements or
partnerships in place to respond
to/or recover from a
pandemic/endemic event
• The Council does not have the
appropriate resilience measures,
emergency or business continuity
plans in place to respond
efficiently as a Category 1
Responder to a civil emergency. 
144

Page 145

 Changes to residual risk scores 
Table 2 provides a summary of changes to risk scores 
Table 2 – Amendments to Risk Scores
Risk Residual
Risk
Score
2024
Residual
Risk
Score
2025
Change in
residual
score
Reason/comments
Information
governance not
subject to adequate
control 
6 9  Information
governance has
been added as a new
area in the annual
governance
statement for
2024/2025 given
current levels of
performance in
responding to FOI’s
and SAR’s and an
awareness of the
impact of security
information incidents. 
The perception of
this risk is increased
with the introduction
of new IT systems
planned for
2025/2026.
Inability to maintain
infrastructure, assets
and properties in a
well-maintained
condition and
difficulties achieving
the objectives of
asset and property
reviews
9 12  The increase in risk
score reflects an
ageing property
asset portfolio
against limited
funding available to
maintain.  
The Council fails to
comply with its
statutory duties by
not conducting
sufficiently robust
impact assessments
where the same are
required, including in
respect of
budget/service
redesign proposals,
leading to potential
legal and financial
challenges, which
could result in failure
16 9  The residual score
has decreased as a
result of the new
integrated impact
assessment process
now being in place,
with training
undertaken across
relevant staff groups.
145

Page 146

Risk Residual
Risk
Score
2024
Residual
Risk
Score
2025
Change in
residual
score
Reason/comments
to deliver those
proposals 
 Changes to risk wording 
Some key risk wordings have been updated to reflect the current status of risks
and/or to provide more straightforward and understandable risk descriptions. 
Amendments of note are summarised below:- 
- “Housing Emergency” has been added to the risk description “inability of the
Council to effectively provide accommodation and support to households who
are homeless and people who arrive in South Lanarkshire as part of refugee
resettlement and the asylum seeker dispersal programmes (including those
for unaccompanied children)”.  This is to incorporate the broader context  for
this risk . 
- The risk wording for the adverse weather risk has been expanded to “Inability
of the Council to manage the impacts that increasing frequency and intensity
of adverse weather events such as floods, storms, cold and freezing
conditions and extreme heat, water shortages and wildfires has on council
services, budgets and our communities,” this amendment is to recognise the
effects that the risk has on the council and our local communities. 
- “Inability to maintain infrastructure, assets and properties in a well-maintained
condition that will avoid unplanned closure, due to budget constraints and
difficulties achieving the objectives of asset and property reviews” has been
refined to “Inability to maintain infrastructure, assets and properties in a well-
maintained condition and difficulties achieving the objectives of asset and
property reviews” 
- “Inability to effectively address RAAC identified within domestic or non-
domestic properties due to constraints on council budgets and the  limitation
on  the ability of  owner occupiers to progress work  to their  property due to
their  financial circumstances” - risk description has been updated to reflect all
emerging health and safety actions “Inability to effectively address RAAC and
other emerging health and safety works identified within domestic or non-
domestic properties due to constraints on council budgets and the limitation on
the ability of adjoining building owners and owner occupiers to progress work to
their property due to their financial circumstances”.  
 Changes to risk controls 
- Fire in Council Properties - risk card has been updated to reflect installation
of fire suppression systems in all new-build council homes and installation of
new fire doors across all 21 multi-storey buildings.
- Tenancy Sustainment – risk card has been updated to reflect tenancy ending
can be for a positive reason and review undertaken of tenancies ending within
1 year to understand the reason and consider any learning.  
146

Page 147

- Home + - risk card has been updated to reflect dedicated government funding
– this has been confirmed for 2025/2026, with agreement on how it will be
allocated reached with Scottish Government.
- Fuel Poverty – risk card has been revised  to reflect factors which cause fuel
poverty including increased energy prices and also note that all new build
properties are to a standard exceeding the energy rating target which
significantly  lowers the consumption of energy required to heat properties. This
aims to reduce energy bills for tenants but is dependent on energy market
prices.  
- Tolerable Standards – risk card updated to reflect that a forced entry
programme in place to address no access issues along with a number of other
revision to approach . 
- City Deal – risk card updated to remove Cathkin Bypass and Greenhills Road
/ Strathaven Road as these projects are now complete. 
- Voids - risk card has been updated to reflect improved internal performance
management  and procurement of preferred supplier completed in August 2024. 
5.6. Risks scored 20 to 25 are considered to be very high risks and risks scored 10 to 16
are considered to be high risks.  Very high and high risks are monitored closely.  The
top risks identified for the Resource, that is those that are residually scored as being
very high and high, are attached at Appendix 1. 
5.7. Appendix 2 provides a comparison of risk scores for 2024 and 2025.  This appendix
also details changes in risk descriptions. 
5.8. As part of the review of the Risk Management Strategy, risk categories were
reviewed and some scores revised.  This has resulted in the following previously
high categorised risks now being categorised as medium level risks:- 
♦ the Council fails to comply with its statutory duties by not conducting sufficiently
robust impact assessments where the same are required in respect of
budget/service redesign proposals, leading to potential legal and financial
challenges, which could result in failure to deliver those proposals 
♦ implications of the Scottish Fire and Rescue Service (SFRS) Unwanted Fire
Alarm Signal Policy within council’s non-domestic estate
♦ failure to meet the Council's 'Homes+' affordable housing supply target resulting
in a reduction in the ability to meet housing need’
♦ failure to address fuel poverty in council houses
♦ inability to ensure public safety and protection
♦ failure to ensure Health, Safety and wellbeing of employees and protection of
service users and members of the public in the delivery of council services
♦ inability of the Council to achieve the outcomes of the Community Plan 2022-32
♦ inability of the Council achieve the outcomes of the Council Plan 
5.9. Risks evaluated residually as being medium or low risk will be monitored to ensure
that they continue to be adequately managed. 
6. Insurance hotspots and claim mitigation
6.1. An analysis of all claims has been undertaken by the Risk Management team.  This
highlights the main cause of claims and areas of concern within each Resource,
which includes house fires for Housing and Technical Resources. This analysis has
now been shared with Resources and feedback requested on controls that are
currently in place and further planned actions to mitigate against the hotspot areas
identified.  
147

Page 148

6.2. An update on measures to mitigate insurance hotspots will be provided to the
Committee in due course. 
7. Horizon scanning
7.1. Through wider analysis and discussion, areas that could pose potential threats and
risks or are emerging issues and opportunities that could affect the Resource were
identified.  Areas identified are listed below. 
The Terrorism (Protection of Premises) Act
The Act, more commonly known as Martyn’s Law, received Royal Assent on 3 April
2025.   
The Security Industry Authority (SIA) has been named as the national regulator, and
it estimates that establishing the new regulatory capability will take at least 24 months
during which time they will work with the Home Office to engage and inform
stakeholders as preparation work progresses. 
The Act will require certain public premises and events to be prepared to keep people
safe in the event of an attack. 
Premises within scope of the legislation will include locations used for entertainment
and leisure, retail, food and drink, museums and galleries, sports grounds (with
controlled entry), the public areas of buildings, visitor attractions and temporary event
spaces where entry to a defined space is ticketed (with or without a fee), as well as
places of worship, health, and education settings. 
Existing council-wide activities related to health and safety, risk management, property
maintenance, resilience and security generally all contribute to creating safe
environments for our staff, service users, visitors, and pupils.  Martyn’s Law will add a
new reference point for these activities. 
The Resilience Adviser, on behalf of the Executive Director Housing and Technical
Resources, will convene a working group comprising representation from Risk
Management, Personnel, Licensing, Property Services, Facilities, Health and Safety,
Education, South Lanarkshire Leisure and Culture (SLLC), Health and Social Care
Partnership (HSCP) and Police Counter Terrorism Liaison Officers to:- 
♦ raise awareness of Martyn’s Law within this group
♦ identify premises anticipated to fall within the respective tiers
♦ identify key issues and make recommendations on changes to policy and/or
procedure for managing the implementation of Martyn’s Law and ongoing
compliance. 
Scotland Excel Supply Chain Intelligence Report  
The Scotland Excel Supply Chain Intelligence 2025 report highlights a significant
number of national and global issues that present supply chain challenges.   
The main areas covered in the 2025 Intelligence Report are:-
♦ The Economic Outlook
♦ Inflation and price fluctuations
♦ Interest rates
♦ Global Market Security  
148

Page 149

♦ International trade tariffs
♦ US-UK Economic Prosperity Deal
♦ The Labour Market
♦ National Insurance Contributions
♦ Changes for international workers in care
♦ Policy and Funding
♦ Local Government Funding Landscape
♦ Proposed policy and legislation changes (Housing, Social Care)
♦ Environmental Change
♦ Avian bird flu
♦ Climate change adaptation
♦ Technological Change
♦ Artificial intelligence in supply chains 
This report has been circulated throughout the Council and Resources are being
encouraged to prepare and where possible put plans in place to react to the
challenges that arise. 
The Housing (Scotland) Bill 
In the year ahead, major aspects of the Housing to 2040 programme will be
progressed  through the implementation of a new Housing Bill, including reform of the
private rented sector tenants, the introduction of new homelessness prevention
requirements for partner agencies and the establishment of the new accessible homes
standard. These will be monitored closely and any risks considered. 
7.2. These areas will continue to be monitored to ensure that the Council is adequately
prepared to respond where required. 
8. Scope and appetite for risk
8.1. The Resource aims to be risk embracing, that is it will accept a tolerable level of risk
in seeking service efficiencies and in agreeing control measures. 
8.2. The level of risk facing the Resource is measured both before (inherent risk) and
after (residual risk) consideration of controls.  The Resource should never carry a
very high residual risk exposure as this would indicate instability, but a low residual
risk exposure should also be avoided as this indicates lack of innovation. 
8.3. The Council’s universal risk tolerance levels were updated as part of the review of
the risk management strategy last year, with the ideal risk profile now defined as:- 
♦ no more than 20 per cent of risks at a very high level
♦ no more than 25 per cent of risks at a high level
♦ around 40 to 50 per cent of risks at a medium level
♦ no more than 25 per cent of risks at a low level 
8.4. Table 3 below shows the Housing and Technical Resources risk heat map, that is,
details the total number of risks for each individual risk score.  Table 3 below notes
the overall risk profile for the Housing and Technical Resources risks.  
149

Page 150

Table 3 – Top risks heat map 
Likelihood
5
Almost
certain 
1  4 
4
Likely   4 2 
3
Possible 1 6 6  
2
Unlikely  3  3 
1
Rare  3 1    
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table 4 – Top risks risk profile
Risk
category
Risk rating Number
of risks
Percentage
of risks
1 Very high (20-25) 4 11.8%
2 High (10-16) 7 20.6%
3 Medium (5-9) 15 44.1%
4 Low (1-4) 8 23.5%  
34 100% 
8.5. The main changes to the Resource risk profile, as a result of the realignment of risk
categories, and changes to risk scores noted in paragraph 5.5, are:- 
♦ number of very high risks has reduced from 7 to 4
♦ number of high risks has reduced from 12 to 7
♦ number of medium risks has increased from 11 to 15
♦ number of low risk has increased from 5 to 8 
8.6. The profile detailed in Table 4 is in line with the ideal universal risk exposure defined
by the Risk Management Strategy.  This is in part due to the revision to risk bandings
and tolerance levels within the strategy. 
9. Three lines model 
The ‘three lines’ model was developed by the Institute of Internal Auditors. When
using this model, risk controls are categorised under three lines of defence.  This
aims to provide assurance around the adequacy of control measures that are in
place to mitigate strategic risks, identify control descriptions that need amendment to
clearly link these to the mitigation of the risk and to highlight any residual gaps in
controls that require to be addressed.   
9.1 Internal Audit work on the three lines model for the top risks has been concluded with
Resources provided with individual analysis and guidance to support them in
developing further controls to close any gaps identified from the three lines approach
for the council top risks that they lead on.   Work is now ongoing to review and refine
risk controls.  This is scheduled to be completed by 31 March 2026.  
150

Page 151

10. Major projects, partnerships or change
10.1 Within Housing and Technical Resources 2 partnerships have been identified.  Both
of these are considered to be low risk. Appropriate risk management arrangements
are in place for the Community Safety Partnership and Hub South West Partnership. 
11. Next steps
11.1 The Resource Risk Management Group will continue to consult on a regular basis. 
The risk register will be reviewed on an ongoing basis by the group to ensure that
risks remain valid for the appropriate Service areas and to identify new areas of risk
that affect the Resource.  An update report will be provided to the Committee on an
annual basis.   
12. Employee Implications
12.1 Time will be required by the Resource Risk Management Group in the management
of the Resource Risk Register and Risk Control Plan. 
13. Financial Implications
13.1 There are no direct financial implications associated with the Resource’s top risks. 
There are a number of proposed risks which are classified under the heading of
financial.  Where this is the case, the appropriate controls and actions have been
included in the risk control cards and progress will be monitored. 
14. Climate Change, Sustainability and Environmental Implications 
14.1 Sustainable development issues are included within the Council’s top risk register
through being linked directly to the Council plan objective ‘make communities safer,
stronger and sustainable’ 
14. Other Implications
14.1 Failure to demonstrate that risk is actively considered and managed cannot only lead
to avoidable financial loss but could also affect delivery of services and could affect
the Resources’ reputation. 
15. Integrated Impact Assessment and Consultation Requirements 
15.1 This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
15.2 Consultation on the content of this report has been undertaken with the Resource
Management Team. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective and efficient 
151

Page 152

Previous References
♦ Report to Housing and Technical Resources Committee – 27 November 2024 – Update
of Housing and Technical Resources Risk Register 
List of Background Papers
♦ None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Cameron Mitchell, Strategy and Support Manager.  
Ext: 4862  (Tel: 01698 454862)
E-mail:  cameron.mitchell@southlanarkshire.gov.uk 
152

Page 153

Appendix 1
Housing and Technical Resources Risk Register (as at September 2025)
Extract of risks with residual score category of Very High and High
Risk
Category
Key risk Inherent
Risk
Score
Sample of Controls Residual
Risk Score
1
Very High
(20-25) 
1. The Budget Gap that the council
faces across the medium term
continues to be the biggest risk faced
by the Council.  The Budget Gap is
the result of the cumulative real terms
reductions in Government funding as
well as the ongoing impact of
increased demand, increased cost of
services due to inflation, and
increased staff costs resulting from
pay awards.  The potential of
reduced fees/income being received
by the Council would further add to
budget pressures across Services 
Council Top Risk 
• Failure to deliver key services
/ projects
• Failure to achieve Resource
savings targets
• Failure to collect Rent/income
• Increased level of arrears
• Failure to effectively manage
the processes and practices
25 • Embedded structure and systematic approach to
savings identification.
• Revise working arrangements and deployment of staff
resources.
• Close partnership working with Department for Work
and Pensions and other agencies.
• Robust rent collection and arrears management
processes to reflect all circumstances.
• Robust arrangements in place to monitor service
delivery and outturns against budgets.
• Regular reporting to Housing and Technical
Resources Committee and Corporate Management
Team.
20
153

Page 154

to reduce the impact of cost
of living crisis
2. Housing Emergency - inability of
the council to effectively provide
accommodation and support to
households who are homeless and
people who arrive in South
Lanarkshire as part of refugee
resettlement and the asylum seeker
dispersal programmes (including
those for unaccompanied children) 
Council Top Risk 
• Statutory requirements not
fulfilled
• Failure to provide suitable
temporary accommodation
• Failure to provide settled
accommodation within a
reasonable timescale 
• Failure to provide the required
support based on individuals
needs 
• Maintain good relationships /
partnerships with National / Local
Governments and Community
Planning Partners
• Failure to resource support
mechanisms required 
• Heightened data security risk
(concern over Russian
interference in relation to
25 • Homelessness Services subject to statutory, regulatory and
intervention. Actively engage, influence and monitor via
National and Local partnerships to ensure appropriate
planning and response.
• Incorporated appropriately within key strategies including
Local Housing Strategy and homelessness strategic plan.
Appropriate monitoring and reporting arrangements in
place including RMT, CMT, Community Planning
Partnership, Homeless Strategy Group and Committees.
• Expanded dedicated resources continued on permanent
basis within Housing and Technical Resources –
Resettlement Team to co-ordinate approach in
implementation of national programmes.
• A range of partnership structures in place to support
implementation including a new group to effectively co-
ordinate activities in South Lanarkshire Council, including
the UK Government appointed delivery agent, including
reporting to national groups.
• COSLA Strategic Migration Partnership (SMP) –
partnership meetings attended by appropriate
representatives to co-ordinate and support delivery of
national programmes in asylum and refugees programmes.
Informal reporting to established COSLA reporting
framework.
• Work actively to procure additional accommodation and
support services and establish appropriate funding routes
(including Scottish and UK Government funding) which
mitigate impact to council. Monitoring arrangements in
place for national government funding reporting and
internal financial reporting arrangements in place.
• On data protection plans in progress to join national app
holding all sensitive information securely, meantime review
of processes in place in conjunction with Digital team
20
154

Page 155

Ukrainian Displaced Persons
programme).
• meet the demand where there is
insufficient suitable temporary
accommodation 
• Failure to reduce the time spent
in temporary accommodation
(including children)
• Inability to delivery
unprecedented demand for
services 
• meet demand for settled
accommodation for homeless
households the Council owes a
duty to accommodate 
• avoid use of  unsuitable
accommodation on a temporary
basis, such as B & B, including
out of local authority area
presentations
• meet  duty to offer temporary
accommodation
• deliver on Strategic Homeless
Plan priorities to reduce
homelessness, time spent as
homeless and demand for
temporary accommodation 
3. Inability to take the necessary
action due to funding constraints, to
combat climate change, and work
toward achieving net zero carbon
emissions by 2045, thereby
contributing to negative and
irreversible environmental, social
25 • Sustainable development and climate change is
mainstreamed across the Council and associated Plans,
Policies and Strategies   
• Climate change and sustainability governance (committee
and steering group)   
20
155

Page 156

and economic impacts on the
council and its residents 
Council Top Risk 
• inadequate or lack of funding 
• lead to slippage against targets
and timescales
• failure by the Council to meet
carbon reduction and
sustainability targets
• failure to deliver energy
efficiency would see an increase
in tenants paying more money
for fuel to heat their homes 
• Implementation of the Council's Sustainable Development
and Climate Change Strategy and carbon management
Action Plan   
• Climate change added to the list of 'permanent' comms
campaigns for the council - awareness raising, education,
promotion and capacity building  
• Long-term capital programme that tackles climate change
mitigation and adaptation    
• Preparation of a pipeline of climate change and mitigation
and adaptation projects to attract investment/funding   
• Energy efficiency investment programmes and strategic
energy reviews of all domestic and non-domestic
properties   
4. The council, in conjunction with its
partners, is unable to provide the
required support to reduce the
overall impact of the cost-of-living
crisis on households in South
Lanarkshire, resulting in increasing
levels of poverty, debt, and poorer
outcomes for people 
Council Top Risk 
• increase council tax and rent
arrears
• an increase in consumer debt
• an increase in the use of prepaid
energy meters
• detrimental impact on mental
and physical health.
25 • Support from Tenancy Sustainment for tenants facing
difficulty paying their rent 
• Provision of housing benefit and Discretionary
Housing Payments support
• Debt and money advice from the Money Matters
Advice Service
• Energy support from dedicated energy advisors
20
156

Page 157

2
High
(10-16)
5. Inability of the council to manage
the impacts that increasing
frequency and intensity of adverse
weather events such as floods,
storms, cold and freezing conditions
and extreme heat, water shortages
and wildfires has on council
services, budgets and our
communities 
Council Top Risk 
• Inability of the Council to deliver
its core services
• Failure to maintain Council assets
• Increase in the number of
insurance claims received
• A potential overspend in budget
as the Council responds to
emergencies
• Damage to public and private
property 
20  • Emergency Planning arrangements in place and contact
details updated. 
• Severe Weather Group established to control the delivery
of the service.
• Decant properties identified.
• Additional Labour/Trades identified.
• Additional Plant/Transport.
• Additional stock.
• Additional sub-contractors identified if work content
becomes high.
• Additional admin staff to deal with
calls/enquiries/complaints.   
• Better housing stock though capital programmes.
• 24 hour control centre.
• General Met Office alerts to Contingency Planning Officers.
• Effective management of existing budget resources
through regular reporting and dialogue with Executive
Director Finance and Corporate Resources 
16 
6. The council inherits commercially
unviable shopping centres due to the
financial failure of existing
owner/management companies
resulting in significant financial and
operational liabilities transferring to
the council 
• Town Centres across the UK face
significant decline with challenges
around covered shopping malls. 
20 • Options appraisals undertaken
• Proactive approach to the transfer of ownership
• Progression of the master planning process
• Retention of professional expertise 
o independent advisers acting on behalf of the Council to
oversee property management decisions by private
owners/management companies.
o consultants appointed to advise on the current condition
of the Centres and potential costs. Advice will also be
sought on demolition 
o specialist legal advice on all aspects 
16
157

Page 158

• Due to these market conditions
the shopping centres in South
Lanarkshire have already failed or
are in the process of failing. 
• Owners/operators face a financial
position where they can no longer
operate these centres.   
• project management team to lead technical delivery of the
project for elements such as the demolition
7. The financial implications of fire
within council properties, particularly
within housing stock, where despite
investment being made and
awareness continuing to be raised,
fires continue to occur 
• Poor / inadequate fire risk
assessments/precautions
• Failure to adhere to building
regulations/statutory legislative
requirements
• Tenants’ lifestyle
• Tenants’ failure to insure their
own contents 
• Owners’ failure to insure their
own property
• Building Users behaviour 
• Wilful Fire Raising 
• Criminality 
• Faulty electrical equipment
• Failure to maintain plant and
equipment
• Property damage
• Loss of rent
• Financial costs for reinstatement
25 • Tenancy Agreement – restrictions 
• Promotion of home contents insurance – booklet and flyers 
• Joint article to be produced in conjunction with SFRS and
Housing Services for inclusion in Housing News 
• Ongoing liaison with SFRS and staff training 
• Common Sense Initiative – communal areas fire safety
posters 
• Legislative compliance checks – gas / electrical etc
• Fire risk assessments.
• Health and Safety audits undertaken
• All new schools have sprinkler or fire suppression systems
• Cyclical visits within schools
• Programmes of work to install controlled door entry systems
• Outcomes of public inquiries 
12
158

Page 159

8. The council does not have the
appropriate resilience measures,
emergency or business continuity
plans in place to respond efficiently
as a Category 1 Responder to a civil
emergency. 
Council Top Risk 
• Corporate Response Group
duties
• Incident scene liaison meetings
and Council Incident Officer
deployment
• Supporting the community in a
time of emergency 
• Representation at Local and
Regional Resilience Partnership
meetings   
• Sharing information internally and
with other responders
• Supporting or leading an
integrated multi agency
emergency response
• Warning and informing the public
• 
Further impacts:
• Unmitigated interruption to
service delivery across all council
Resources
• Reputational damage and
censure for the organisation and
individual stakeholders
25 • Established contingency planning methodology
integrating civil protection and business continuity
arrangements which reflects legislative commitments as a
Category One (Emergency) Responder
• Defined roles and responsibilities for key stakeholders
across the contingency planning lifecycle of prepare,
respond and review  
• Multi agency partnership working through Local and
Regional Resilience Partnerships
• Lessons learned meetings – review of incidents/actions
required to mitigate
• Business Continuity management information pack in
place to support preparation and update of Business
Continuity Plans
• Agile Working Guidance allows staff to work a hybrid
model supports services being maintained during periods
of emergency  
• Experiences gained from COVID19 Pandemic places the
council in a better position to respond to a public health
emergency.  
12
159

Page 160

• Litigation / claims
9. Inability to maintain infrastructure,
assets and properties in a well-
maintained condition and difficulties
achieving the objectives of asset
and property reviews 
Council Top Risk 
• Lack of future/continued
investment in these areas
uncertain
• Maintain and repair existing assets
in a safe and well-maintained
condition due to lack of funding
and budget constraints
• Deliver corporate asset
management plan (separate risk
card)
• Standard maintenance not being
carried
• Building closures
• Meet aims for Social and Health
Agenda, as identified in the
Council Plan
• Deterioration to assets as a result
of pro-longed or increase in severe
weather events 
20 • Development and implementation of a cross-cutting review
of the Council’s property asset base, which is linked to an
intention to seek approval for a 10-Year Estate Strategy. To
be reported on an interim basis at Executive Committee
2025 June and full report in November 2025
• Remove liability for unsustainable properties - Pursue
Community Asset Transfer where appropriate and seek
disposal of surplus property through disposal
• Annual update to Asset Management Plan with strategic
document developed
• Dispose of unsuitable buildings and identify redundant
assets in line with the outcomes of the Estates Strategy
Review
12
10. Procurement activity is affected
by supply chain issues; a lack of
resources; non-compliance or legal
challenge 
Council Top Risk
25 • Full contract wording includes SLC expectations from
contractors.
• Guidance on new legislation including the Bribery Act and
the linkages with procurement issued by Legal Services. 
Council has a security framework in place.
12
160

Page 161

• Failure to fulfil statutory
requirements 
• Failure to achieve best value.
• Service delivery affected/fails.
• Cyber Attacks - failure to protect
our data systems or assets held
by Council
• Serious organised crime -
proceeds of crime or money
laundering
• Lack of trained personnel 
• Contractor vetting (Health and Safety), construction line
and financial checks undertaken for all contractors.
• Meetings with contractors to review
performance/appraisals.
• iProc used extensively by all Resources.
• Learn online employee training – Quick quote/procurement
awareness.
• Standard procurement documents/processes held on
intranet and reviewed/updated on an ongoing basis.  These
are used consistently across Resources.
• Review of procedures for financial appraisals.
• Performance monitoring of all significant contracts.
11. Inability of the Council to
effectively comply with current
Tolerable Standard within Scottish
Housing Quality Standard, Element
11 – Electrical Installations, Element
11A – Smoke and Heat Alarms and
Element 11B – Carbon Monoxide
Alarms. 
• Tenant and resident safety
requirements 
• Failure to meet statutory and
regulatory requirements 
15 • Ongoing monitoring of legislative compliance programme.
• Resource Plan updated Q2 and Q4 and reported to HTR
Committee. 
• Proactively targeting upgrading of legislative compliance for
relevant aspects via capital programme and void stage. 
• Action plan in place, including appropriate use of forced
entry
• Rolling social media campaigns for access to properties via
Housing News, South Lanarkshire View and other relevant
digital platforms
• Development of customer portal on new HOME project 
• Routinely update bank of tenants’ email addresses
• Monthly reporting to Scottish Housing Regulator
10 
161

Page 162

Appendix 2: Comparison 2025 and 2024 Housing and Technical Resources risk register 
Risk
Category
Key risk 2024
Residual
risk
score 
2025
Residual
risk
score
Change
in
residual
risk
scores
Other changes
1
Very High
(20-25) 
The Budget Gap that
the council faces
across the medium
term continues to be
the biggest risk
faced by the
Council.  The Budget
Gap is the result of
the cumulative real
terms reductions in
Government funding
as well as the
ongoing impact of
increased demand,
increased cost of
services due to
inflation, and
increased staff costs
resulting from pay
awards.  The
potential of reduced
fees/income being
received by the
Council would
further add to budget
pressures across
Services
20 20 = Revised wording 
Housing Emergency
- inability of the
council to effectively
provide
accommodation and
support to
households who are
homeless and
people who arrive in
South Lanarkshire
as part of refugee
20 20 = Addition of “Housing
Emergency” to key risk
wording
162

Page 163

resettlement and
the asylum seeker
dispersal
programmes
(including those for
unaccompanied
children)
Inability to take the
necessary action
due to funding
constraints, to
combat climate
change, and work
toward achieving net
zero carbon
emissions by 2045,
thereby contributing
to negative and
irreversible
environmental,
social and economic
impacts on the
council and its
residents
20 20 = 
The council, in
conjunction with its
partners, is unable to
provide the required
support to reduce
the overall impact of
the cost-of-living
crisis on households
in South
Lanarkshire,
resulting in
increasing levels of
poverty, debt, and
poorer outcomes for
people 
20 20 = 
2
High
(10-16)
Inability of the
council to manage
the impacts that
increasing frequency
and intensity of
adverse weather
events such as
floods, storms, cold
16 16 = Wording Amended to
acknowledge the effects
severe weather has on
council services and
budgets
163

Page 164

and freezing
conditions and
extreme heat, water
shortages and
wildfires has on
council services,
budgets and our
communities
The council inherits
commercially
unviable shopping
centres due to the
financial failure of
existing
owner/management
companies resulting
in significant financial
and operational
liabilities transferring
to the council 
16 16 = 
The financial
implications of fire
within council
properties,
particularly within
housing stock,
where despite
investment being
made and
awareness
continuing to be
raised, fires continue
to occur
12 12 = 
The council does not
have the appropriate
resilience measures,
emergency or
business continuity
plans in place to
respond efficiently
as a Category 1
Responder to a civil
emergency.
12 12 = The following 2 risks
have been consolidated
to the revised wording to
improve clarity: 
Failure to fulfil
emergency
response
commitments
befitting the
council’s status
as a Category
One
(emergency)
responder 
164

Page 165

and 
The council does
not have the
appropriate
emergency /
business continuity
plans; contingency
arrangements or
partnerships in
place to respond
to/or recover from a
pandemic/ endemic
event.  
Inability to maintain
infrastructure, assets
and properties in a
well-maintained
condition and
difficulties achieving
the objectives of
asset and property
reviews
9 12  The increase in risk score
reflects an ageing
property asset portfolio
against limited funding
available to maintain.   
Amended wording 
Procurement activity
is affected by supply
chain issues; a lack
of resources; non-
compliance or legal
challenge
12 12 = 
Inability of the
Council to effectively
comply with current
Tolerable Standard
within Scottish
Housing Quality
Standard, Element
11 – Electrical
Installations,
Element 11A –
Smoke and Heat
Alarms and Element
11B – Carbon
Monoxide Alarms
10 10 = 
165

Page 166

166

Page 167

Report
Agenda Item 
Report to: Housing and Technical Resources Committee
Date of Meeting: 8 October 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Review of the Housing Services Customer
Involvement Strategy 2024 to 2029 
1. Purpose of Report
1.1 The purpose of the report is to:- 
 provide the Committee with an update on the progress made during 2024/2025
against the agreed outcomes set out in the Customer Involvement Strategy 2024
to 2029 
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):- 
(1) that the progress on actions for delivering the agreed Customer Involvement
Strategy objectives across 4 strategic outcomes, be noted.
[1recs]
3. Background
3.1 The Housing (Scotland) Act 2001 requires local authorities to have a strategy in place
setting out how tenants and customers can influence decisions about the housing
services they receive.  The Strategy was developed in accordance with the
requirements of the Housing (Scotland) Act 2001, alongside the principles of both the
Community Empowerment (Scotland) Act 2015 and the National Standards for
Community Engagement. 
3.2. The current Customer Involvement Strategy was approved by Housing and Technical
Resources Committee on 7 February 2024 and implemented from 1 April 2024. 
3.3. The Strategy covers a 5-year period with the first annual review outlining progress
achieved during 2024/2025. 
3.4. The Strategy is constructed around 4 strategic objectives with a series of objectives
and actions contained within each to be delivered by the Council and its partners. 
These are:- 
 customers are informed and knowledgeable
 more customers are involved
 customers drive continuous service improvement
 customers shape change and make a difference 
3.5. Tenants were involved in the development of the Customer Involvement Strategy
through the Tenant Participation Co-ordination Group (TPCG), comprising of tenant
representatives from each of the 4 housing divisions.  
18
167

Page 168

4. Context and wider policy changes
4.1. A small number of changes in policy context have taken place nationally and locally
since the strategy was approved in February 2024, including:- 
♦ the contract for the South Lanarkshire Tenant Development Support Project
(SLTDSP) was re-tendered for 2 years with the option to extend for up to 12
months, with the contract awarded to the Tenant Information Service in December
2024.  SLTDSP will continue to support the delivery of the objectives of the
Customer Involvement Strategy 2024 to 2029
♦ The Scottish Housing Regulator published a Thematic Review of tenant and 
Gypsy/Traveller Participation in Scottish Social Housing in November 2024,
providing good practice examples and recommendations for improvement.  These
findings will be considered in the delivery of the Customer Involvement Strategy in
2025/2026 
5. Customer Involvement Strategy Annual Review
5.1. The Customer Involvement Strategy 2024 to 2029 contains 22 objectives against
which the Council monitors progress.  In line with wider reporting arrangements across
the council, these indicators can be categorised into ‘green’, ‘amber’, and ‘red’
depending on the progress made against them.  Actions can also be recorded as
‘completed’ where appropriate, or ‘to be reported later’ if they are planned for delivery
in a future year of the Strategy. 
5.2. At the end of 2024/2025, 68% of objectives are in line with projected targets, with 23%
to be delivered in future years of the strategy.  Table 1 outlines the 2024/2025
categorisation of the 22 objectives. 
Table 1: Overview of indicators 
Blue
(completed) Green Amber Red To be
reported later Total
0 15 2 0 5 22
Table 1: Categorisation of Customer Involvement Strategy indicators 2024/2025 
5.3. Key highlights from across the 4 strategic outcomes throughout 2024/2025 have been
provided below:- 
Strategic Outcome 1 – Customers are informed and knowledgeable
♦ The Customer Publicity Group, made up of tenant representatives and the Council,
met five times throughout 2024/2025 to ensure that Housing and Technical
Resources publications are clear and easy to understand.  During the year they
reviewed and approved the:- 
♦ annual rent increase letter
♦ annual Gas Safety Service letter
♦ Kitchen Replacement Programme contact card and online content
♦ summer edition of Housing News  
168

Page 169

♦ Social media, text and email were used to promote 6 customer consultations
throughout the year covering:-
♦ rent setting
♦ a review of the Scheme of Assistance
♦ the development of the council’s Local Heat and Energy Efficiency Strategy
♦ the review of the Repairs Policy
♦ a consultation with tenants in rural villages
♦ a consultation with customers to understand how, where, and when they wish
to be involved to influence decisions about the housing services they receive 
A total of 2,652 responses were received during 2024/2025 across these
consultations. 
♦ The Council’s Annual Return on the Charter (ARC), setting out the council’s
performance in relation to the Scottish Social Housing Charter, was considered by
the Tenant Participation Co-ordination Group in May 2024 before being submitted
to the Scottish Housing Regulator.  The TPCG used this information to compare
the performance of South Lanarkshire Council against other local authorities and
inform the development of the Customer Scrutiny Programme.  It was also reported
more widely to tenants in the Autumn 2024 edition of Housing News.   
Strategic Outcome 2 – More customers are involved
♦ During 2024/2025, 430 tenants or other customers were added to the ‘interested
individual’ database. All individuals on the database will be contacted regularly
about participating in events, meetings, and consultations.
♦ The Council continued to engage with the Gypsy/Traveller community in South
Lanarkshire, holding two residents’ meetings at Shawlands Crescent during
2024/25 to discuss the ongoing delivery of the co-developed site Masterplan. 
Newsletters were also published for residents at the Springbank Park and
Shawlands Crescent sites with regular 1-2-1 engagement also taking place.
♦ Housing Services met with members of South Lanarkshire’s Youth Council and
Youth Parliament to consider young people’s housing priorities and discuss how to
share information in a youth friendly format. 
Strategic Outcome 3 – Customers drive continuous service improvement
♦ The tenant agreed Customer Scrutiny Programme for 2024/2025 was completed
with two scrutiny exercises focusing on the homelessness application process and
the Home and Health Assessment process for housing. 
♦ Reports on the findings of the scrutiny exercises were reported to the relevant
management teams, to agree good practice recommendations for improvement. 
Strategic Outcome 4 – Customers shape change and make a difference 
♦ Tenants had direct involvement in directing spending of over £11.000m within the
Housing Investment Programme during 2024/2025 as part of the Council’s
Participatory Budgeting programme.  This included:- 
♦ Tenants at 4 sheltered housing sites being consulted on a range of internal
and external upgrades that totalled over £1.000m.
♦ Residents at Shawlands Crescent Gypsy/Traveller site were consulted on a
series of improvement works in line with site Masterplan that totalled over
£0.400m.
♦ The tenants in the first phase of the Kitchen Replacement Programme
choosing their preferred style of kitchen, totalling over £3.700m.  
169

Page 170

♦ Tenants choosing their preferred windows/doors as part of the replacement
programme, totalling £5.745m.
♦ Tenants involved in directing the Customer Involvement Budget through the
TPCG and Project Monitoring Group (PMG), totalling £0.070m.
♦ Tenants in four divisions informing priorities for the spending of the Estate
Improvement Budget, totalling £0.040m. 
5.4. Two outcomes were assessed as ‘amber’ during the 2024/2025 annual review:- 
♦ The work to co-produce an annual calendar highlighting customer involvement
activities and events was not completed during 2024/2025. This will now be
developed in line with the review of customer engagement information on the
Council’s website that will be undertaken during 2025/2026
♦ While the action to publish annual ‘You Said, We Did’ feedback to customers began
during 2024/25, the action will continue into 2025/2026 and align with the Customer
Scrutiny Programme for 2025/2026 and the review of customer engagement
information on the council’s website 
5.5. There were no red indicators identified during the review. Performance across
the outcomes will continue to be monitored in 2025/2026. 
6. Proposed Revisions to the Strategy
6.1. As well as providing an opportunity to assess and report on progress, the annual
review process allows for a general re-examination of the Customer Involvement
Strategy 2024 to 2029 to ensure that the strategic objectives, actions and
measures remain appropriate, relevant and measurable. 
6.2. Following the completion of the review, no revisions are proposed to the
performance framework were identified at this stage, with all objectives and
indicators remaining relevant. 
7. Next Steps
7.1. The review identified that the Housing and Technical Resources has made good
progress in 2024/2025 towards delivering the 4 strategic outcomes. 
7.2. The Council will continue to work strategically with tenants and other partners to
engage with customers of Housing Services to deliver the Customer Involvement
Strategy during 2025/2026. 
7.3. The Council will continue to monitor, influence and where possible enact any national
policy changes that relate to the Customer Involvement Strategy 2024 to 2029. 
8. Employee Implications
8.1 There are no employee implications as a result of this report. 
9. Financial Implications
9.1. There are no financial implications as a result of this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no climate change, sustainability or environmental implications as a result
of this report.  
170

Page 171

10.2. The Strategic Environmental Assessment (SEA) pre-screening determination reached
during the development of the strategy concluded that a full SEA was not required. 
11. Other Implications
11.1. There are no other implications as a result of this report. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. Whilst the Customer Involvement Strategy 2024 to 2029 was introduced prior to the
implementation of Integrated Impact Assessments, both an Equality Impact
Assessment and a Fairer Scotland Duty assessment were conducted. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 August 2025 
Links to Council Values/Priorities/Outcomes
♦ Focused on people and their needs
♦ Working with and respecting others
♦ Accountable, effective, efficient and transparent
♦ Ambitious, self-aware and improving
♦ Fair, open and sustainable   
Previous References
♦ Housing and Technical Resources Committee - Customer Involvement Strategy 2024
to 2029 - 7 February 2024 
List of Background Papers
♦ Customer Involvement Strategy 2024 to 2029 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Claire Frew, Strategy and Policy Co-ordinator, Housing and Technical Resources 
E-mail: Claire.frew@southlanarkshire.gov.uk 
171