Democracy Spraffa

Agenda Document Pack - Hamilton Area Committee - 08/02/2023

South Lanarkshire Council · 8 February 2023
Back to Hamilton Area Committee — 8 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 31 January 2023 
Dear Councillor 
Hamilton Area Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 08 February 2023
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Allan Falconer (Chair), Mo Razzaq (Depute Chair), Andy Carmichael, Maureen Chalmers, Ross
Clark, Maureen Devlin, Colin Dewar, Mary Donnelly, Celine Handibode, Graeme Horne, Martin
Hose, Cal Johnston-Dempsey, Gavin Keatt, Kenny McCreary, Lesley McDonald, Mark McGeever,
Davie McLachlan, Richard Nelson, John Ross, Bert Thomson, Helen Toner
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the previous meeting of the Hamilton Area Committee held on 9
November 2022 submitted for approval as a correct record.  (Copy attached) 
3 - 8 
Item(s) for Noting 
3 Community Asset Transfer Update
Report dated 10 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
9 - 12 
4 Participatory Budgeting - Education Resources - Pupil Equity Funding
Report dated 24 January 2023 by the Executive Director (Education
Resources).  (Copy attached) 
13 - 24 
5 Participatory Budgeting - Housing and Technical Resources - Estate
Improvement Budget
Report dated 24 January 2023 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
25 - 26 
6 Update on Town Centres
Report dated 24 January 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
27 - 30 
Item(s) for Decision 
7 Application P/22/1613 for Change of Use From Dwellinghouse to Short-
term Lets/Serviced Accommodation at 26 Shawburn Street, Hamilton
Report dated 23 January 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
31 - 38 
8 Community Grant Applications/Warm Welcome Initiative
Report dated 24 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
39 - 44 
Urgent Business 
9 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

HAMILTON AREA COMMITTEE 
Minutes of meeting held via Teams and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 9 November 2022 
Chair:
Councillor Allan Falconer 
Councillors Present:
Councillor Andy Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor
Maureen Devlin, Councillor Colin Dewar, Councillor Mary Donnelly, Councillor Cal Johnston-
Dempsey, Councillor Gavin Keatt, Councillor Kenny McCreary, Councillor Lesley McDonald,
Councillor Mark McGeever, Councillor Mo Razzaq (Depute), Councillor Bert Thomson, Councillor
Helen Toner 
Councillors' Apologies:
Councillor Celine Handibode, Councillor Graeme Horne, Councillor Martin Hose, Councillor Davie
McLachlan, Councillor Richard Nelson, Councillor John Ross 
Attending:
Education Resources
L Mitchell, Quality Improvement Officer
Finance and Corporate Resources
G Cochran, Administration Assistant; J McCafferty, Development Officer;  E A McGonigle,
Administration Officer; K McLeod, Administration Assistant; L O’Hagan, Finance Manager
(Strategy) 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s) Item(s) Nature of Interest(s) 
Devlin and
McCreary
Community Grant Applications:-
♦ Bothwell Futures (HA/24/22)  Members of Group 
In terms of Standing Order No 14, the Chair adjourned the meeting at 2.06pm for a 5 minute
period 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Hamilton Area Committee held on 31 August 2022 were
submitted for approval as a correct record.   
The Committee decided: that the minutes be approved as a correct record. 
3 Common Good Update 
A report dated 20 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the Hamilton Common Good fund.
2
3

Page 4

Common Good was a fund of money or assets, or both, which was administered by a Scottish
local authority in respect of each former burgh within the local authority area.  Common Good
property was owned by the local authority and administered separately from other local
authority assets for accounting purposes.   
The Common Good funds held in South Lanarkshire were Biggar, Hamilton, Lanark and
Rutherglen.  The Common Good fund in Hamilton held a number of properties and a proactive
approach to maintenance supported the viability of those assets and reduced the Council’s
risk to greater liability in the future.  On 2 October 2013, the Finance and Corporate
Resources Committee approved an annual cyclical maintenance plan of £15,000 for Hamilton
Common Good properties and the Executive Director (Finance and Corporate Resources) had
delegated authority to approve maintenance expenditure up to that amount for all funds. 
Finance Services administered the Common Good accounts, which included revenue
monitoring, preparation of annual accounts and, when required, to seek approval from the
Finance and Corporate Resources Committee for expenditure to be incurred on various
projects.  Reports on the management of the Common Good funds would be provided
annually to appropriate Area Committees. 
The unaudited annual accounts for 2021/2022 were detailed at Appendix 1 to the report.  The
balance invested in the Council’s Loans Fund for Hamilton was £412,000 and details of those
assets were provided in Appendix 2 to the report. 
Details were provided on repairs and maintenance incurred during 2021/2022 and the
commitments for repairs and planned maintenance in 2022/2023.  There had been no
consultations on Common Good properties since the previous update to the Committee on 8
September 2021. 
There followed a full discussion on the report during which the Finance Manager (Strategy)
responded to members’ questions and undertook to:- 
♦ provide information on administration costs of the Common Good Fund and whether this
could be reviewed or increased
♦ provide a member with further details on the £3,000 for repair and redecoration works in
Hamilton Town Centre, as detailed in section 8.3 of the report
♦ provide a member with details on the sale of the former Vogue Bingo Hall/Cinema which
had still to be concluded. It was expected that this would be removed from the asset
register during 2022/2023
♦ take a request to the Finance and Corporate Resources Committee for the Davie Cooper
Monument at the Hamilton Palace Grounds to be cleaned 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 8 September 2021 (Paragraph 3)] 
4 Participatory Budgeting – Place Based Programme 
A report dated 25 October 2022 by the Executive Director (Education Resources) was
submitted on Participatory Budgeting (PB) in relation to the Place Based Programme.
4

Page 5

An update was given on Hillhouse/Udston/Burnbank where the stakeholder group had been
actively involved in designing the PB process. The consultation process opened on 14
September 2022 and had closed on 25 October 2022. Although proposals were welcomed on
the 10 priority themes within the plan, the stakeholder group had decided that, in 2022/2023,
the emphasis would be placed on projects and activities that:- 
 promoted financial wellbeing
 reduced the impact of the cost-of-living crisis
 promoted health improvement 
The stakeholder group met on 27 October 2022 to assess the proposals received. Details
were provided on the voting process which concluded on 8 November 2022. 
The stakeholder group in Strutherhill and Birkenshaw was actively involved in the PB process.
Discussions were underway and a series of meetings and contacts had been made with
relevant partners so that the following 3 elements of activity for investment could be enabled:- 
 play and park development
 physical environment improvements
 a bike initiative 
The stakeholder group was proactively promoting neighbourhood planning and the benefits
that this had brought to the area.  Planned community events, hosted by local schools and
community groups, would be used to raise awareness and promote wider community
involvement in the neighbourhood planning process. 
An update was provided on the PB activity in Blantyre. The funding for 2021/2022 had been
carried over so that local priorities could be re-established. A public survey had been carried
out which ended in June 2022 and this had received 743 votes and identified 3 themes as
follows:- 
 youth activities
 community safety
 community activities 
A total of £11,200 had been allocated to 6 groups and those were detailed in the report. A
breakdown of those voting by age, gender, ethnic background and disability was provided in
the report. Consideration would be given to involving more men and young people in this
year’s process which was currently being planned by the stakeholder group. 
The Development Officer responded to members’ questions on various aspects of the report.  
In relation to ensuring more young people and elderly people were involved in the PB process,
assurance was provided that the team would continue publicise the process to as many local
groups as possible. 
The Committee decided: that the report be noted. 
5 Education Resources - Participatory Budgeting - Pupil Equity Funding 
A report dated 14 October 2022 by the Executive Director (Education Resources) was
submitted on Participatory Budgeting (PB) in relation to Pupil Equity Funding (PEF).
5

Page 6

An update was given on PB activity within Education Resources in 2021/2022 which
highlighted that:- 
 a video showing the work of PB within Education Resources in 2021/2022 had been
shared locally and nationally
 lead officers had presented the Council’s PB journey at PB Scotland’s National
Conference on 28 September 2022
 Education Resources had submitted an award application to the International
Observatory on Participatory Democracy for the Best Practice Award for Citizen
Participation.  The application highlighted the success of PB in schools during
2021/2022.  The evaluation phase for the award was currently underway
 a PB section had been developed within a new Equity Hub, an online site to provide
schools with support and resources to assist in tackling the poverty related attainment
gap 
PB activity in 2022/2023 was also detailed in the report which highlighted that:- 
 prior to the summer holiday period, Head Teachers had been asked to allocate a
minimum of 5% of their 2022/2023 PEF allocation and identify a staff member to
lead/facilitate this activity in their school
 refreshed PB training had been developed and delivered to Head Teachers and PB
Leads
 Head Teachers had subsequently identified the percentage of their 2022/2023 PEF
allocation they wished to allocate to PB in 2022/2023 
Schools within the Hamilton area had allocated £196,007.25 of their £3,656,910 million PEF
allocation for PB.  A breakdown of the allocation for each learning community was provided in
Appendix 1 to the report.  Appendix 2 of the report summarised the percentage of PEF which
schools had allocated for PB.  A further school-by-school breakdown was outlined in Appendix
3 of the report. 
PB Stakeholder groups, comprising pupils, parents and staff, were currently leading the PB
process in their schools.  The outcome for each school would be reported to Education
Resources by 7 October 2022.  Information on the outcome of the process would be shared at
future Area Committee meetings. 
Education Resources would provide Area Committees with:- 
 a summary report of each school’s PB outcome 
 case studies of school activity, which had particular impact/success 
 a detailed financial report of how PEF money allocated for PB had been spent 
Education Resources would support schools and monitor and track the impact of this activity. 
Findings would inform any future PB activity within the Resource. 
The Committee acknowledged the good work that had been undertaken in relation to the PEF
and thanked everyone involved, particularly the young people, whose voices were so
important. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 16 February 2022 (Paragraph 3)]
6

Page 7

6 Community Grant Applications 
A report dated 20 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on applications for community grants. 
There followed a discussion on the recommended grant awards to community groups which
were presented to the Area Committee.  The amount of grant proposed took account of the
eligibility criteria for grants and, as a general rule, was based on a ‘standard’ level of grant
dependent on the type of organisation/activity etc.  This aimed to provide consistency across
the 4 Area Committee areas.   
The following 2 proposals were put forward by the Committee and, following lengthy debate, it
was agreed that the Chairs of the other Area Committees be consulted in order that a
consistent approach could be adopted:- 
 a copy of each grant application should be circulated to the Area Committee to help
inform the amount awarded by the Committee
 each grant application should be considered on its individual merit and that the current
criteria, particularly for the variable categories of spend, was not the best approach 
Following discussion on the proposal to award Bothwell Futures a community grant of £456,
Councillor Johnston-Dempsey, seconded by Councillor Donnelly, moved that the level of grant
be increased to £760 which was unanimously agreed. 
The Committee decided: 
(1) that community grants be awarded as follows:- 
(a) Applicant: Larkhall Avondale Amateur Swimming Club (HA/18/22) 
Purpose of Grant: Equipment 
Amount Awarded: £600 
(b) Applicant: 78th Lanarkshire (3rd Blantyre) Scout Group (HA/21/22)  
Purpose of Grant: Entrance fees  
Amount Awarded: £350 
(c) Applicant: Hamilton Ramblers Club (HA/23/22)  
Purpose of Grant: Outing  
Amount Awarded: £300 
(d) Applicant: Bothwell Futures (HA/24/22) 
Purpose of Grant: Equipment, administration and publicity costs 
Amount Awarded: £760 
Councillors Devlin and McCreary, having declared an interest in the above
application, withdrew from the meeting during its consideration 
(e) Applicant: Blantyre Bonnie Tots (HA/25/22)  
Purpose of Grant: Start-up costs - equipment  
Amount Awarded: £300 
(f) Applicant: 1st Larkhall Girls’ Brigade (HA/26/22)  
Purpose of Grant: Outing, administration and publicity costs  
Amount Awarded: £350
7

Page 8

(2) that the Chairs of the other Area Committees be consulted on the proposals outlined by
the Committee in relation to the allocation of community grants in order that a consistent
approach be agreed across all 4 areas. 
[Reference: Minutes of 31 August 2022 (Paragraph 7)] 
7 Urgent Business
There were no items of urgent business. 
8

Page 9

Report
Agenda Item 
Report to: Hamilton Area Committee
Date of Meeting: 8 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Asset Transfer Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide Members with an update on the current work related to Community Asset
Transfer 
2. Recommendation(s) 
The Committee is asked to approve the following recommendation(s):- 
(1) that progress regarding the development of Community Asset Transfer be
noted. 
3. Background
3.1. The Community Empowerment (Scotland) Act 2015 created several legal obligations
aimed at improving the involvement of community members in the design,
implementation and delivery of services and activities that impacted them and their
fellow residents, 1 of which was the introduction of Community Asset Transfer (CAT). 
3.2. CAT enables suitably constituted local community organisations to formally apply to
lease, purchase or implement managed arrangements for any land or property owned
by relevant public bodies where they can evidence that their proposed community
benefit is better than the current usage. 
3.3. As this legislation increasingly impacted upon the work of the authority, a dedicated
Community Asset Transfer officer was employed from March 2022 on a 2-year
contract.  The officer’s role was to improve the authority’s internal processes, redesign
community information (website, documentation and marketing) to improve uptake,
support organisations considering the process and to act as a conduit for the flow of
information within the Council and externally. 
4. Redesign of internal processes
4.1. The existing website was basic and contained limited information. This has been
upgraded to be more user friendly and provide both members of the public and
interested parties with more information on the process. This will go live in early 2023. 
4.2. An animation has been designed and created and can be viewed at
https://www.youtube.com/watch?v=smqE8MHVh1o. 
5. Promotion of CAT Processes Internally
5.1. The CAT process can be complicated for colleagues and elected members who may
be approached with regards to it. With this in mind, an internal short training package
3
9

Page 10

was produced and is hosted on the Council’s Learn-On-Line training platform which
provides basic information on the process. 
6. External Promotion 
6.1. The CAT officer has attended a wide number of third sector network events to promote
the opportunities that exist using the legislation. Strong links have been developed
with key local and national agencies such as Voluntary Action South Lanarkshire
(VASLAN) and Community Ownership Support Services, ensuring that where
possible, a joined-up approach exists to support interested organisations into and
through the progress. 
6.2. The CAT officer hosted a recent information event in conjunction with South
Lanarkshire Leisure and Culture (SLLC) and the Scottish Football Association (SFA)
to provide information to over 50 individuals representing community football clubs on
the CAT process and what it means to them. 
7. Progress to Date
7.1. South Lanarkshire-wide there has been contact from over 75 organisations during the
last financial year. 19 of these organisations were from the Hamilton area. 
7.2. Of these enquiries the CAT officer is currently in dialogue with 30 organisations who
are interested in using the legislation. 5 of these were from the Hamilton area. 
7.3. Two applications have been submitted and approved, and it is anticipated that a further
5 will be submitted before the end of the year. One of these is from the Hamilton area. 
8. Employee Implications
8.1. There are no employee implications associated with this report. 
9. Financial Implications 
9.1. There are no financial implications associated with this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1 There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
11. Other Implications
11.1. There are no risk or sustainability issues associated with the content of this report. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
10 January 2023 
10

Page 11

Link to Council Values/Priorities/Outcomes
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Iain Mulholland, Community Asset Transfer Officer
Email: Iain.Mulholland@southlanarkshire.gov.uk 
11

Page 12

12

Page 13

Participatory Budgeting – Update for Hamilton Area Committee January 2023
Service Area Education Lead Officer Laura Mitchell  
Stage 1 : Pre Consultation :
• What are we asking the public for their view on (what service is it /
description etc)? 
• How much funding are we asking about? 
• Who are we asking, 
• How are we doing this ?  
• When are we doing this ?
• When will we report back ? 
Progress update since last Area Committee 
Participatory Budget Allocation:
As reported at the last Hamilton Area Committee, schools within the Hamilton area have
collectively allocated £196,007.25 (approximately 5.4%) of their £3,656,910 Pupil Equity
Funding (PEF) allocation for participatory budgeting (PB).  Appendix 1 shows a
breakdown of this for each of the learning communities.  Appendix 2 summarises the
percentage of PEF allocation that schools have allocated for participatory budgeting –
78% of schools have allocated the minimum 5% of their PEF budget, whilst 22% of
schools have allocated more than this. 
Reported Outcome
The Participatory Budgeting Stakeholder Group in each school has led the PB process in
their school with the consultation now complete.  Appendix 3 outlines the outcome of the
vote for each school.  Appendix 4 shows the distribution of spend across the Hamilton
Area.  Appendix 5 outlines the distribution of votes by stakeholders across the Hamilton
area. 
Next Steps
Schools are now progressing with their spend, to ensure the minimum 5% is spent in full
by end of March 2023.  The central Equity Team are available to help schools navigate
any challenges they face to ensure a full spend before the end of the financial year. 
Stage 2 : Post Consultation
• The outcome of the PB activity 
• What happens next ? 
• Further reporting requirements (e.g. required Committee approval) 
Following the voting, Education Resources will provide Area Committees with the
following:- 
- Summary Report of each school’s PB outcome (available late October/early
November) and Local Authority and Area analysis report of this
- Case studies of school activity, which has had particular impact/success (ongoing
throughout the year)
- Detailed Local Authority Financial Report of how PEF money allocated for PB has
been spent (May/June 2023) 
Education Resources will support schools with implementation of this and monitor and
track the impact of this activity. Findings will inform any future PB activity within Education
Resources. 
Regular PB Updates and the highlighting of good practice will be communicated to
schools via the Equity Hub and through our @SLCEquity Twitter handle. 
4
13

Page 14

Appendix 1: 
14

Page 15

Appendix 2: 
15

Page 16

Appendix 3:   
16

Page 17

17

Page 18

18

Page 19

19

Page 20

20

Page 21

21

Page 22

Appendix 4: 
22

Page 23

Appendix 5: 
23

Page 24

24

Page 25

Update for Hamilton Area Committee 
Participatory Budgeting – Update for Area Committee
Service Area Estate Improvement
Budget 
Lead Officer Claire Frew
Stage 1 : Pre Consultation :
• What are we asking the public for their view on (what service is it / description etc)? 
• How much funding are we asking about? 
• Who are we asking, 
• How are we doing this?  
• When are we doing this?
• When will we report back? 
Improving Bin Areas in Blantyre
The Estate Improvement Budget totals £40,000 and is split across the 4 housing divisions of South
Lanarkshire.  Each local housing management team can direct the funding towards projects or
improvements highlighted as a priority by customers of Housing and Property Services.  Although
not a significant value, the budget is ideally suited for conversion to a participatory budgeting
approach as often funds a number of smaller projects that have been highlighted as a priority by
customers.  Examples for its use recently have been the installation of new fencing and lighting,
which the types and design of were consulted on with customers.   
To date, one project has been completed within the Hamilton area with improvements made to bin
areas in the Industrial Estate area of Blantyre following feedback from tenants. 
Improving Lighting in Larkhall
In addition to the project undertaken through the Estate Improvement Budget, a small project to
improve lighting in Larkhall was delivered through the Planned Maintenance Budget following
tenants highlighting safety and security issues. 
Stage 2: Post Consultation
• The outcome of the PB activity 
• What happens next? 
• Further reporting requirements (e.g. required Committee approval)  
Improving Bin Areas in Blantyre
In response to customer feedback, £3,109.20 was spent removing bin chutes and installing new
bins in the Industrial Estate area of Blantyre. 
Improving Lighting in Larkhall
Following engagement with local people who raised safety and security issues in Larkhall, officers
utilised funding from the Planned Maintenance Budget to carry out an additional project making
improvements to lighting at Annbank Street.  The total cost of the project was £3,865.71. 
Officers from Housing and Technical Resources will continue to take forward opportunities within
the Hamilton area to ensure tenants and other customers have the opportunity to determine the
outcome of budgets within the Environmental Programme and Community Safety Partnership
Commissioning Budget, with further updates provided to Committee at a later date. 
5
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Hamilton Area Committee
Date of Meeting: 8 February 2023
Report by: Executive Director (Community and Enterprise
Resources) 
Subject: Update on Town Centres 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update members on the activity currently being undertaken in town centres across
the Hamilton area 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the current activity across town centres be noted.
[recs]
3. Background
3.1. The nature of town centres across the UK is in a transitional stage.  The range of
issues involved in the challenges town centres are facing are broad and complex.
Factors such as the economic downturn, internet shopping, the growth of out of town
shopping malls, changes in retailers’ business models and consumer expectations
have resulted in a decline in footfall. 
3.2. Some of the issues are local and specific to individual towns, however, many are
issues seen across the country influenced by wider economic patterns, consumer
behaviour and corporate decisions.  Supporting town centres remains a Council
priority and officers continue to work in partnership with groups and organisations in
each town to achieve our common goals. 
3.3. The role town centres have in our communities is significant and, therefore, their role
cannot be overstated. Town centres support and contribute to people across our
communities whether this is to access essential services, visiting for shopping or
enjoying leisure time. 
3.4. Around 70% of businesses and jobs in the economy are located in town centres and
they are the principal location for leisure and hospitality.  They retain a vital social
importance as a meeting, events and performance space. 
3.5. Across the 10 towns defined in the South Lanarkshire Local Development Plan (LDP)
there is active and ongoing engagement with the most appropriate groups in the town. 
These range from town to town and include Business Improvement Districts (BIDs),
Development Trusts, Community Councils and private property owners.   
6
27

Page 28

3.6. Town Centre strategies and action plans have been prepared and approved for
Hamilton, Cambuslang, Larkhall and Blantyre with work now underway in Rutherglen. 
Similar plans are being progressed by the communities in Lanark and Carluke along
with the master planning work by the owners of East Kilbride. 
3.7. These strategies and action plans are closely aligned with the Government approach
to town centres captured in the New Future for Scotland’s Town Centres report and
action plan. 
3.8. Officers in Economic Development are working with all key stakeholders across our
towns and have commissioned 2 key pieces of work to set the direction of the
Council’s work around town centres going forward.  These will inform and align with
existing and emerging funding opportunities around town centres.  
 Town Centre Visioning – this will set out how the Council delivers on the strategic
aims and objectives at a local level.  As noted above, while all towns have similar
challenges, the solutions are not always the same.  This work will set out how
the Council, communities and partners should deliver meaningful and
sustainable change within our town centres through a series of projects and
action plans. 
 Transition to net zero – town centres are major contributors to pollution and
although a number of early wins have been achieved, the ways to deliver long
term meaningful and sustainable reductions are complex and not always
palatable to business or customers.  This work will set out a practical approach
to working towards net zero across our towns. 
4. Town Centre Activity
4.1. Hamilton 
The town centre strategy and action plan were put in place in October 2018 and, given
the continued change in consumer behaviour, the impact of the pandemic and the
increased focus on the climate emergency officers have begun a review and update
of the strategy and action plan. 
4.2. This work is at a very early stage and will go through a similar process used for the
preparation of each of the previous strategies. The aim will be to present a consultative
draft to the Community and Enterprise Resources Committee in early summer 2023.
This will capture the strategic work set out at section 3.8 of this report, a review of the
previous strategy and initial suggestions for the action plan moving forward. Officers
will consult with a range of partners and interested parties in the preparation of this
initial draft and will look to hold a full consultation of the draft document over the
summer period of 2023. 
4.3. There are a number of ongoing projects linked to the previous strategy which are at
various stages of delivery. The success of those projects which have been delivered
and continual engagement to deliver those which are outstanding will be key to the
future success of Hamilton. 
4.4. Blantyre 
The Blantyre town centre strategy and action plan were approved at the Community
and Enterprise Committee in October 2022 following an extensive period of work and
consultation. Officers are now liaising with the community to deliver on the objectives
set out in the report. 
28

Page 29

4.5. Larkhall 
The Larkhall town centre strategy and action plan were approved at the Community
and Enterprise Resources Committee in May 2021. The completion of this work has
assisted the community in securing town centre capital funding to deliver a range of
town centre project and improvements. These projects are close to completion and
the groups are working on their next round of bids.   
4.6. As can be seen from above, there is significant and ongoing activity across the town
centres in the Hamilton area and officers in Enterprise and Sustainable Development
would be keen to explore further opportunities with groups across our communities. 
5. Employee Implications
5.1. There are no employee implications from the information set out in this report 
6. Financial Implications
6.1. There are no financial implications from the information set out in this report.  All
projects and spend referred to will be subject to separate approvals as appropriate 
7. Climate Change, Sustainability and Environmental Implications
7.1. Climate change and working to net zero is at the heart of all the work on town centres
as we seek to deliver sustainable town centres which support liveable
neighbourhoods. 
8. Other Implications
8.1. All town centres face a challenging set of circumstances.  It is essential the Council
plays a full and active role in the future of or town centres.  Not doing so will result in
continued decline and greater demands on limited resources. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Our town centres have to be available for all across our communities.  We continue to
work and consult with a broad range of groups across our communities and as noted
above the work involved in improving our town centres will be subject to wide
consultation. 
David Booth
Executive Director (Community and Enterprise Resources) 
24 January 2023 
Link(s) to Council Values/Priorities/Outcomes
Values
 Ambitious, self-aware and improving
 Fair, open and sustainable
Priorities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres 
29

Page 30

Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Ross, Project Manager, Enterprise and Sustainable Development
E-mail: Iain.ross@southlanarkshire.gov.uk
30

Page 31

Report
Agenda Item 
Report to: Hamilton Area Committee
Date of Meeting: 8 February 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/1613
Change of use of dwellinghouse to short-term lets/serviced
accommodation 
1 Summary application information 
[purpose]
•Application type:  Detailed planning application
•
Applicant:  Mr. Steven Evans 
•Location:  26 Shawburn Street
Hamilton
ML3 9DX 
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Area Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Kimberley Hughes
♦ Council Area/Ward: 18 Hamilton West and Earnock
♦ Policy Reference(s): Policy 2 - Climate Change
Policy 3 - General Urban Areas and Settlements
Policy 5 - Development Management and
Placemaking
Policy 6 - Visitor Economy and Tourism
Policy VET2 - Visitor Accommodation 
♦ Representation(s): 
► 6  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
7
31

Page 32

♦ Consultation(s):   
Roads Development Management Team 
Environmental Services 
32

Page 33

Planning Application Report
1 Application Site
1.1 The site relates to an upper floor cottage flat at 26 Shawburn Street, Hamilton.  The
2-bedroom flat has a driveway with a single off-street parking space and a rear
garden shared with the lower flat. 
1.2 Shawburn Street is a residential cul-de-sac composed of primarily cottage flats of
similar scale and design, although not all properties have a driveway. That said the
neighbouring property to the north-east (No. 24) is a semi-detached two storey
house. 
1.3 To the rear of the application site is a row/group of trees which separates the site
from the A724 (Burnbank Road). The wider area is mainly residential in character. 
2 Proposal(s)
2.1 The proposal relates to a change of use of the 2-bedroom cottage flat to short-term
let accommodation.  No external alterations/changes are proposed. 
2.2 The applicant has provided details of the operation of the proposed short-term let.
The property is to be let in its entirety and not for housing multiple occupants (House
of Multiple Occupancy) and shall be managed by a professional letting agent who
specialise in letting to professionals and businesses as well as insurance companies
to accommodate people displaced from their own home due to repair work. The
property may, however, on occasion be let as tourist accommodation. 
3 Background
3.1 Local Plan Status
3.1.1 With regard to the South Lanarkshire Local Development Plan 2 this application
must be assessed against: Policy 2 – Climate Change and Policy 5 – Development
Management and Placemaking. In addition, as the site falls within the general urban
area Policy 3 – General Urban Areas - is also applicable. Furthermore, as the
property will on occasion be used as tourist accommodation, Policies 6 - Visitor
Economy and Tourism and VET2 – Visitor Accommodation are also a consideration. 
3.1.2 Policy 2 – Climate Change identifies that all development should seek to minimise
and mitigate the effects of climate change, however, a change of use from flat to
short-term let is not considered to have a significant impact on the climate. 
3.1.3 Policy 3 – General Urban Areas and Settlements states that proposals that are
ancillary to residential areas will be assessed on their individual merits regarding
their effect on the amenity and character of the area. 
3.1.4 Policy 5 – Development Management and Placemaking states that the Council
should ensure that the proposal will not result in any significant adverse impact on
nearby buildings or the streetscape by way of layout, scale, massing, design, or
external materials. Development should also have no unacceptable adverse impacts
by way of overshadowing, overlooking or any other loss of residential amenity. 
3.1.5 Policy 6 – Visitor Economy and Tourism states that proposal for new visitor
accommodation will be supported where they contribute to the visitor economy and
demonstrate their viability. Development should respect the area’s character and
have suitable parking provision. 
33

Page 34

3.1.6 Policy VET2 – Visitor Accommodation states that all proposals should be
accompanied by a business plan demonstrating financial viability and that proposals
within settlement boundaries should respect and integrate with the establish
character and streetscape. 
3.1.7 Section 7.0 (Short-term lets/self-catering) of the recently approved Supporting
Planning Guidance at a Dwellinghouse sets out that in deciding if a material change
of use has occurred the following factors will be considered:- 
 how guests arrive and depart
 likely frequency and intensity of noise or other antisocial behaviour
 impact on public services and resident’s amenity
 the ability of provide in-curtilage car parking
 cumulative impact on the character and amenity of a neighbourhood
 number or people staying. 
3.2 Relevant Government Advice/Policy
3.2.1 The Revised Draft National Planning Framework 4 (NPF4) was approved by the
Scottish Parliament on the 11 January 2023. In the interim period before NPF4 is
formally adopted, it will be considered a significant material consideration in the
determination of planning applications. In this instance, there are not considered to
be any provisions of the NPF4 draft framework which would materially affect the
determination of this application. 
3.3 Planning Background
3.3.1 There are no records of any previous planning applications relating to 26 Shawburn
Street, Hamilton. 
4 Consultation(s)
4.1  Roads Development Management Team – No objection. Visibility splays are
achievable, one off-street parking space is acceptable for the proposal, and on-street
parking is also available. 
4.2 Environmental Services - No adverse comments or objection. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken, and 6 letters of objection were
received from neighbouring proprietors. The grounds of objection are summarised as
follows: 
a) There is insufficient parking on the street to accommodate the proposal
which is impacting residents’ ability to park. The proposal could also be
detrimental to road safety and traffic congestion as pavements are full of
parked cars and vans thus a fire engine would have trouble reaching the
bottom of the street and the proposal is a danger to children playing and
impairs the movement of elderly residents.
Response:  Shawburn Street is within an established residential area where
cottage flats are dominant. When built, the provision of off-street parking was
not a major consideration presumably due to low car ownership at that time.
This, however, has changed with the passage of time. 
Any residential use of the property has potential to generate demand for
parking be it one, two or more cars. The proposed use has similar possibilities
and the fact that one off street parking space exists is advantageous.
Furthermore, the limited number of bedrooms (two) is likely to limit parking
34

Page 35

demand. Accordingly, it is not considered that this proposal would have any
detrimental effect in terms of parking when compared with the existing
situation. The property will remain residential in use/character with the same
parking requirements as being occupied long-term. It must be recognised that
this is only one of several properties on the street and is not the sole cause of
the expressed traffic/parking concerns. Indeed, 26 Shawburn Street has a
driveway which approximately half the properties on the street do not, and as
a 2-bedroom property it would be unlikely to require more than one vehicle to
park on-street. Consequently, any perceived parking and traffic issues in
Shawsburn Street are not considered sufficient justification to refuse planning
permission. 
In terms of accidents and associated perceived danger this, on the balance of
probability, is more likely to be due to irresponsible/inconsiderate driving
rather that one property being used for short-term lets. 
b) The proposal could have a detrimental impact in terms of noise and
disturbance.
Response:  The property will remain residential in use and while it will be
used for short-term let instead of long-term occupancy, it will have similar
amenity impacts. On this basis it is not considered that change of use when
compared with ‘normal’ occupancy would cause any significant adverse
impacts in terms of noise and disturbance. 
5.2 These letters have been copied and are available for inspection in the usual manner
and on the planning portal. 
6 Assessment and Conclusions
6.1 The determining issues in the consideration of this application are its compliance
with the adopted South Lanarkshire Local Development Plan 2 and its impact on the
amenity of the adjacent area. 
6.2 It is considered that the proposed change of use raises no unacceptable issues from
a development management perspective. In relation to Policies 2, 3, 5, 6, and VET2
of the South Lanarkshire Local Development Plan 2, it is noted that:- 
 As the application is for a change of use to an existing flatted dwelling, the
development will not result in a significant material impact on the climate. 
 No external changes are proposed to the flat, therefore, the change of use will
not have a significant material impact on the physical character of the flat or its
surroundings. 
 Due to the proposed short-term let being a 2-bed cottage flat, the number of
residents at any one time will be limited by the nature of the building. Guests
will arrive and depart at varying times of day and the flat may be left unoccupied
just as permanent residents would. The flat has one off-street parking space
instead of the Council’s minimum standard of two spaces, however, on-street
parking is also available and whether the flat is occupied long-term or let short-
term, it would have the same parking requirements. The management company
would take responsibility for disposing of waste and the flat would also benefit
from Council refuse collection. Consequently, as a short-term let the property
will have similar amenity impacts as its current use and, therefore, it is not
considered that the proposed change of use would cause significant adverse
impacts on neighbouring amenity. 
35

Page 36

 While Policies 6 and VET2 seek evidence of financial viability, this has not been
sought for the establishment of the proposed short-term let as the applicant has
provided a supporting statement detailing that the accommodation is not
intended for general tourist purposes but mainly for letting to professionals,
businesses, and home insurance companies. 
6.3 The main consideration in the assessment of this application is the impact of the
proposed use on the existing level of amenity. It is, however, considered that use as
a short-term let will have a comparable impact on amenity as a permanently
occupied flatted dwelling. Consequently, the proposal accords with the
considerations of Policies 2, 3, 5, 6 and VET2 of the South Lanarkshire Local
Development Plan 2. 
6.4 Given the above, it is recommended that planning permission be granted. 
7 Reasons for Decision
7.1 The proposal will not result in a significant adverse impact on residential amenity and
complies with the provisions of Policies 2, 3, 5, 6 and VET2 of the adopted Local
Development Plan 2. There are no other material considerations which would justify
the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 January 2023 
Previous references
 None 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (Adopted 2021)
► Neighbour notification letter dated 25 November 2022
► Supporting Planning Guidance – Development at a Dwellinghouse.
► Consultations: 
Roads Development Management Team 30.11.2022
Environmental Services 06.12.2022
► Representations           Dated:  
S Thompson
28 Shawburn Street, Hamilton, ML3 9DX  22.12.2022 
M McJamie
24 Shawburn Street, Hamilton, ML3 9DX  22.12.2022 
E Devine
34 Shawburn Street, Hamilton, ML3 9DX  12.12.2022
Elizabeth Valentin 
36

Page 37

32 Shawburn Street, Hamilton, ML3 9DX  14.12.2022 
Shelley McKeown  15.12.2022
Miss Jacqueline Campbell
22 Shawburn Street, Hamilton, ML3 9DX  02.12.2022 
Contact for further information:
If you would like to inspect the background papers or want further information, please
contact:- 
Mark Ripley, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07385516141   
Email: mark.ripley@southlanarkshire.gov.uk 
37

Page 38

Detailed planning application 
Paper apart – Application number: P/22/1613 
Conditions and reasons 
01. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice.   
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
02. That the permission hereby granted is for a temporary period only and shall expire
on 8 February 2033. For the avoidance of doubt, at the expiry of this permission the
property will revert to Use Class 9 - House, unless an application is submitted to and
approved by the Council as Planning Authority.   
Reason: To safeguard the amenity of the area. 
03. That within the 10-year period set-out in Condition 1, the use of the short-term let
hereby approved shall be restricted to short-term occupation only and shall not be let
or used as the sole residence of any one person, family, or group. No individual,
family, company, group, or any other type of occupant shall occupy the
accommodation for more than 12 weeks in any calendar year. To facilitate
monitoring, a record system of all lettings, to include names, addresses and duration
of stay, shall be in place at all times for Council inspection and shall be submitted to
the Council as Planning Authority 12 months from the date of initial occupation or
completion, whichever is the earlier, and every 12 months thereafter.   
Reason: To ensure that the accommodation does not become occupied by long term
or permanent residents without the express grant of planning permission and to
ensure compliance with local plan policy.
38

Page 39

Report
Agenda Item 
Report to: Hamilton Area Committee
Date of Meeting: 8 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Grant Applications/Warm Welcome
Initiative 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval for the allocation of community grants to 8 community groups in
the Hamilton Area Committee area from the 2022/2023 community grant budget
 advise of grants awarded to community and voluntary groups/organisations in the
Hamilton Area Committee area in response to the Warm Welcome Initiative 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that community grants be awarded as follows:- 
(a) Applicant:  Dalserf Village Garden Club, Larkhall      
(HA/20/22)   
Purpose of Grant:  Environmental project   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £380   
Total Eligible Grant Applied for: £380   
Recommendation:  £228 
Amount Awarded:  To be determined by the Committee 
(b) Applicant:  Larkhall OAP Association Town Branch
(HA/22/22)   
Purpose of Grant:  Outing   
Identified Community Benefits: Working with and respecting others   
Estimated Cost:  £300   
Total Eligible Grant Applied for: £300   
Recommendation:  £300 
Amount Awarded:  To be determined by the Committee
8
39

Page 40

(c) Applicant:  REACH Lanarkshire Autism SCIO,
Hamilton (HA/27/22)   
Purpose of Grant:  Equipment, outing and entrance fees   
Identified Community Benefits: Focused on people and their needs   
Estimated Cost:  £800   
Total Eligible Grant Applied for: £800   
Recommendation:  £530   
Amount Awarded:  To be determined by the Committee 
(d) Applicant:  Cadzow Community Corps, Hamilton      
(HA/28/22)   
Purpose of Grant:  Equipment and materials   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £625   
Total Eligible Grant Applied for: £625   
Recommendation:  £375   
Amount Awarded:  To be determined by the Committee 
(e) Applicant:  Trinity Church Guild, Larkhall (HA/30/22)   
Purpose of Grant:  Outing   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £400   
Total Eligible Grant Applied for: £400   
Recommendation:  £300   
Amount Awarded:  To be determined by the Committee 
(f) Applicant:  Hamilton Stitchers (HA/31/22)   
Purpose of Grant:  Equipment, outing and entrance fees   
Identified Community Benefits: Caring, connected, sustainable      
communities   
Estimated Cost:  £986   
Total Eligible Grant Applied for: £986   
Recommendation:  £530 
Amount Awarded:  To be determined by the Committee 
(g) Applicant: National Autistic Society (NAS) South
Lanarkshire, Hamilton (HA/33/22)   
Purpose of Grant:  Materials   
Identified Community Benefits: Focused on people and their needs   
Estimated Cost:  £210   
Total Eligible Grant Applied for: £210   
Recommendation:  £126 
Amount Awarded:  To be determined by the Committee 
(h) Applicant:  Hamilton YFC (HA/34/22)   
Purpose of Grant:  Start-up costs - Equipment   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £360   
Total Eligible Grant Applied for: £360   
Recommendation:  £300 
Amount Awarded:  To be determined by the Committee 
(2) that the award of 6 grants, totalling £5,500, to the following community and
voluntary groups/organisations in the Hamilton Area in response to the Warm
Welcome Initiative be noted:-
40

Page 41

(a) Applicant:  Hamilton Old Parish Church   
Amount Applied for:  £1,000   
Amount Awarded:  £1,000 
(b) Applicant:  The Machan Trust, Larkhall   
Amount Applied for:  £1,000   
Amount Awarded:  £1,000 
(c) Applicant:   St Andrew’s Parish Church, Blantyre   
Amount Applied for:  £1,000   
Amount Awarded:  £1,000 
(d) Applicant:  Meikle Earnock Community Council,
Hamilton   
Amount Applied for:  £1,000   
Amount Awarded:  £1,000 
(e) Applicant:  Supporting Our Community, Hamilton   
Amount Applied for:  £1,000   
Amount Awarded:  £1,000 
(f) Applicant:  Hamilton Baptist Church   
Amount Applied for:  £500   
Amount Awarded:  £500 
3. Background
3.1. The Council operates a community grants scheme to support local constituted
community groups and voluntary organisations.  All applications require to be
supported by a constitution, audited accounts or annual income and expenditure
accounts, a bank statement, and confirmation that the group/organisation will adhere
to the conditions of the grant award. Applications are invited continually throughout
the year. 
3.2. The main aims of the community grants scheme are to:- 
 fund activities and projects which bring community benefit
 involve people in the community by bringing them together to enjoy educational,
recreational, leisure and other community activities or to improve the local
environment 
3.3. Support can be provided for a range of activities including administration and
publicity costs, purchase of equipment and materials, annual outings and entrance
fees, start-up costs and special events. 
3.4. At the meeting of the full Council on 28 September 2022, it was agreed that the Chief
Executive would bring forward a package of cost of living supports for agreement, in
consultation with the Group Leaders, and endorsed by the Executive Committee at
its meeting on 30 November 2022.  This package included support for a Warm
Welcome Initiative. 
3.5. Working in conjunction with South Lanarkshire Leisure and Culture and community
and voluntary groups and organisations, the Warm Welcome Initiative is a network of
warm spaces in community settings and public buildings where members of the
public are welcomed and can participate in activities and access advice and support. 
41

Page 42

To support the Initiative, a small grants scheme was created offering grants to a
maximum of £1,000 to cover extra costs incurred by offering a Warm Welcome.  A
total of £40,000 was identified for the Initiative and the monies were apportioned
equally between the 4 Area Committees. 
3.6. As funds were required immediately to assist in the response effort, it was agreed
that applications would be considered by the Executive Director (Finance and
Corporate Resources), in consultation with the relevant Area Committee Chair and
submitted to the Area Committee for noting. 
3.7. In terms of the community grants scheme, community groups would normally only be
permitted to submit one application in each financial year, however, community
groups that applied for funding to assist in the Warm Welcome Initiative are entitled
to apply for a grant for another purpose under the scheme in the same financial year. 
3.8. A total of 6 grants were awarded to community and voluntary groups/organisations in
the Hamilton Area, totalling £5,500. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. The current position of the community for the Hamilton Area Committee area in
2022/2023 is as follows:- 
Total allocation for Community Grants £25,750
Grants previously allocated £9,278
Community grants allocated in this report £2,689
Remaining balance £13,783 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The risk to the Council is that grant funding is not utilised for the purpose of which it
was intended.  This risk is mitigated by internal controls including audit procedures
and conditions of grant agreement. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. All the necessary consultation with the community groups has taken place. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 January 2023
42

Page 43

Link(s) to Council Values/Priorities/Outcomes
♦ Accountable, effective, efficient and transparent
♦ We will work towards a sustainable future in sustainable places
♦ Caring, connected, sustainable communities 
Previous References
 Hamilton Area Committee – 9 November 2022
 Executive Committee – 30 November 2022
 South Lanarkshire Council – 28 September 2022 
List of Background Papers
 Individual application forms 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Geraldine Wilkinson, Clerical Assistant 
Ext:  4818  (Tel:  01698 454818)
E-mail:  geraldine.wilkinson@southlanarkshire.gov.uk 
43

Page 44

44