Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 03 February 2026 
Dear Councillor 
Hamilton Area Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 11 February 2026
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Allan Falconer (Chair), Mo Razzaq (Depute Chair), Andy Carmichael, Maureen Chalmers, Ross
Clark, Maureen Devlin, Colin Dewar, Mary Donnelly, Celine Handibode, Graeme Horne, Martin
Hose, Cal Johnston-Dempsey, Gavin Keatt, Kenny McCreary, Lesley McDonald, Mark McGeever,
Davie McLachlan, Richard Nelson, John Ross, Bert Thomson, Helen Toner 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Hamilton Area Committee held on 12 November
2025 submitted for approval as a correct record. (Copy attached) 
3 - 6 
Item(s) for Noting 
3 Delivering a Lasting Impact - Routes to Work South Presentation
Presentation by N McNaughton, Deputy Chief Executive, Routes to Work South 
4 Chatelherault Country Park Masterplan
Report dated 13 January 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
7 - 10 
5 Housing and Technical Resources - Participatory Budgeting Update
2025/2026
Report dated 27 January 2026 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
11 - 16 
6 Hamilton Common Good - Update Report
Report dated 21 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
17 - 24 
7 Forward Programme for Future Meetings
Report dated 19 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
25 - 28 
Item(s) for Decision 
8 Community Grant Applications
Report dated 27 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
29 - 32 
Urgent Business 
9 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Laura Cunningham
Clerk Telephone: 07385 370044
Clerk Email: laura.cunningham2@southlanarkshire.gov.uk 
2

Page 3

HAMILTON AREA COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 12 November 2025 
Chair:
Councillor Allan Falconer 
Councillors Present:
Councillor Andy Carmichael, Councillor Ross Clark, Councillor Maureen Devlin, Councillor Colin
Dewar, Councillor Mary Donnelly, Councillor Martin Hose, Councillor Cal Johnston-Dempsey,
Councillor Gavin Keatt, Councillor Kenny McCreary, Councillor Lesley McDonald, Councillor Davie
McLachlan, Councillor Mo Razzaq (Depute), Councillor John Ross, Councillor Bert Thomson 
Councillors’ Apologies:
Councillor Maureen Chalmers, Councillor Celine Handibode, Councillor Graeme Horne, Councillor
Mark McGeever, Councillor Richard Nelson, Councillor Helen Toner 
Attending:
Chief Executive’s Office
A Hopkins-Simpson, Development Officer; J Kerr, Community Engagement Manager
Education Resources
E Fitzpatrick, Headteacher, St Mary’s Primary School; A Jessimer, Lead Officer
Finance and Corporate Resources
L Cunningham, Administration Officer; A Norris, Administration Assistant; T Slater, Administration
Adviser
Housing and Technical Resources
J Read, Strategy and Policy Adviser 
Also Attending:
Police Scotland
Area Inspector M Chivers; Chief Inspector S McArthur; Sergeant S McDonald 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Hamilton Area Committee held on 3 September 2025 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Local Policing Annual Update 
Chief Inspector S McArthur, Area Inspector M Chivers and Sergeant S McDonald, Police
Scotland gave a presentation providing an update on police activity within Hamilton and Larkhall
which was focused and strategically aligned with Operation Evolve, Police Scotland’s 2030
vision.   
Information was provided on various activities to tackle key issues including:- 
 violent crime and anti-social behaviour
2
3

Page 4

 sexual crime/gender-based abuse
 online safety/protecting the most vulnerable
 road safety
 acquisitive crime
 serious and organised crime/substance induced harm 
Having responded to members’ questions, the officers from Police Scotland were thanked for
their informative presentation. 
The Committee decided: that the presentation be noted. 
[Reference: Minutes of 14 August 2024 (Paragraph 3)] 
4 Education Scotland Report - St Mary's Primary School, Hamilton 
A report dated 29 September 2025 by the Executive Director (Education Resources) was
submitted on the outcome of the inspection of St Mary’s Primary School, Hamilton by Education
Scotland. 
The inspection had taken place in May 2025 as part of a national sample of primary education
and the report by Education Scotland had been published on 19 August 2025.   
A number of particular strengths of the school had been identified.  Areas for continued
improvement, agreed with the school and education authority, had been incorporated into the
school’s improvement plan.  Education Scotland had intimated that they would make no further
visits in connection with this inspection. 
A Jessimer, Lead Officer and E Fitzpatrick, Headteacher, having spoken on key aspects of the
report, were congratulated on the positive inspection. 
The Committee decided: that the report be noted. 
5 Community Engagement Team Update 2024/2025 
A report dated 30 October 2025 by the Chief Executive was submitted providing an update on
the work of the Community Engagement Team in Hamilton between 1 April 2024 and 31 March
2025. 
Neighbourhood planning activity was first initiated in South Lanarkshire in 2017 and aimed to
tackle inequalities and improve outcomes for local people living in some of South Lanarkshire’s
most deprived areas. 
The Community Engagement Team was established in 2019 to develop community
empowerment and participation on behalf of the Council and deliver its duties within the
Community Planning Partnership (CPP).  The team had co-produced 9 neighbourhood plans in
South Lanarkshire’s areas that experienced inequalities and had at least 1 data zone in the top
5% of the most deprived areas of Scotland included in the Scottish Index of Multiple Deprivation
(SIMD).  A 10th plan for East Kilbride South was currently in progress. 
Information was provided on the other areas of work the team undertook in relation to tackling
poverty and community capacity building, including:- 
 neighbourhood planning areas
 placed based Participatory Budgeting, as detailed at Appendix 3
4

Page 5

 the Can Do Community Fund
 community asset transfers
 the community wishlist
 period positive in community venues
 support to community partnerships 
An annual report for all neighbourhood plans was attached as Appendix 1 to the report which
would be shared with local communities. 
Officers responded to members’ questions on various aspects of the report and undertook to:- 
 liaise with a member in relation to the timing of “Our Place Our Plan” Stakeholder Group
meetings
 provide a member with the formulas and boundaries in relation to Participatory Budgeting
allocations. 
Members commended the Community Engagement Team for all the work it carried out. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 15 May 2024 (Paragraph 6)] 
6 Forward Programme for Future Meetings 
A report dated 23 October 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on the outline forward programme for the meetings of the Hamilton Area
Committee to 23 September 2026. 
As part of future arrangements, members were invited to suggest topics for inclusion in the
Committee’s forward programme. 
The Committee decided: that the outline forward programme for the meetings of the
Hamilton Area Committee to 23 September 2026 be noted. 
[Reference: Minutes of 3 September 2025 (Paragraph 6)] 
7 Community Grant Applications 
A report dated 27 October 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on 2 applications for community grant. 
There followed a discussion during which members debated the amounts that should be
allocated for community grants.  Following discussion, Councillor Falconer, seconded by
Councillor Razzaq, moved that the recommendations for the community grants, as detailed at
section 2.1 of the report, be approved.  Councillor Dewar, seconded by Councillor Donnelly,
moved as an amendment that the total eligible amounts applied for be approved. 
On a vote being taken using the electronic voting system, 5 members voted for the amendment,
and 10 members voted for the motion which was declared carried. 
The Committee decided: that community grants be awarded as follows:- 
(a) Applicant: St Mary’s For All SCIO, Hamilton (HA/20/25) 
Purpose of Grant: Equipment, administration and publicity costs 
Amount Awarded: £300
5

Page 6

(b) Applicant: Udston Primary School Parent Council, Hamilton (HA/25/25) 
Purpose of Grant: Equipment 
Amount Awarded: £525 
[Reference: Minutes of 3 September 2025 (Paragraph 7)] 
8 Urgent Business
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Hamilton Area Committee 
Date of Meeting: 11 February 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Chatelherault Country Park Masterplan 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update members on the work undertaken to develop a Masterplan for Chatelherault
Country Park which provides a strategic approach for development and investment
over the next ten years 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that it be noted that the Community and Enterprise Resources Committee
approved the strategic approach for development and investment in
Chatelherault at its meeting on 7 October 2025;
(2) that it be noted that a series of investment proposals have been identified to
deliver beneficial and impactful improvements to Chatelherault for which external
funding opportunities will be sought, and;
(3) that it be noted that investigations are underway to establish the deliverability of
the identified Phase 1 White Bridge project. 
3. Background
3.1. In March 2024, following a competitive procurement exercise, Enterprise and
Sustainable Development Services appointed Turner and Townsend Project
Management (TTPM) to assemble and lead a multidisciplinary design team to
undertake a master planning exercise for Chatelherault and Calderglen Country Parks. 
The multidisciplinary design team comprises Landscape Architect, Architects, Civil and
Structural Engineers, Transport Consultant, Planning Consultant, Forestry Consultant,
Property Agent and Cost Consultant. 
3.2. In consultation with the Council and South Lanarkshire Leisure and Culture (SLLC),
the design team were asked to develop a suite of bespoke strategic documents and
supporting intelligence, including Masterplans and Green Book Business Cases, for
both Chatelherault and Calderglen setting out the context for development and
investment over the next 10 years.  Each Masterplan reflects the shared aspiration to
maintain Chatelherault and Calderglen as regional destinations offering vibrant and
welcoming facilities which are linked to, and contribute towards, the regeneration of
surrounding communities. 
4
7

Page 8

3.3. In addition to the masterplans, Forestry Management Plans (FMP) are also being
updated for each park to ensure effective planning, management, and enhancements
to maintain ecological, historical, and user-experience value.  The FMP will help
protect historic features, sensitive habitats and special landscapes for the enjoyment
of visitors.   
3.4. The consultancy work was fully funded by the UK Shared Prosperity Fund. 
4. Consultation and Engagement 
4.1. TTPM facilitated workshops attended by colleagues from across the Council and SLLC
on topics including but not limited to heritage, woodland management, branding,
commercial opportunities, risk, location and access.  The Council facilitated broad
stakeholder engagement including targeted briefings and discussions with elected
members, SLLC Board, Historic Environment Scotland, local residents and sports
clubs.  Initial public consultation events took place at Chatelherault Country Park
during August 2024 and included an online survey which received 658 responses. 
4.2. The intelligence gathered from this wide-ranging consultation and stakeholder
engagement, together with specialist input from the multidisciplinary design team, has
informed the development of investment proposals for Chatelherault Country Park. 
4.3. Follow up public engagement sessions were held at Chatelherault during late August,
early September 2025 to share the proposed strategic approach and present the draft
proposals.  This on-site engagement was supported by a dedicated website and once
again, the public had the opportunity to complete an online survey which received 550
responses. 
5. Short List of Investment Proposals  
5.1. The Chatelherault Country Park Masterplan has been informed by the short list of
investment proposals as detailed below. 
Chatelherault Investment Proposals 
Architectural Interventions
Visitor Experience 
Enhanced visitor centre including re-configuration of
arrival space and transformation of the café,
exhibition and conference area with new roof-top
orangery 
Heritage  Repairs and upgrades to Grade A Listed Hunting
Lodge 
Landscape Interventions
Access  Enhance paths/landscape surrounding visitor centre
and central facilities 
Play  Expansion and upgrade of the existing adventure
playground 
Parking 
Existing overflow car park formalised including
integrated drainage and electric car charging
infrastructure 
Infrastructure and Servicing
8

Page 9

Events Infrastructure
Power/ water/Wi-Fi infrastructure distributed around
the park for events. Infrastructure works include the
addition of a new gatehouse building to service the
play park and events, including sanitary facilities,
community room and shop
Paths Infrastructure  Reinstating the White Bridge 
5.2. The delivery of these investment proposals is contingent upon the availability of
funding.  The Council will use the Masterplan and investment proposals to actively
explore and pursue external funding opportunities as they become available. 
5.3. As the proposals are implemented, it is anticipated that the overall sustainability of the
park will improve supporting ongoing investment in other aspects of the park over time. 
For example, additional improvements may include:- 
 Signage Strategy - Site-wide replacement of signs and addition of new signs
particularly at key points.  This may include integrated lighting, braille, mapping
information and QR codes to link to a website.
 Arts Strategy - Public sculpture could be located at key gateways. 
 Repairs to Trails - Around 30% of the trail network in Chatelherault, including
stepped areas, could benefit from improvement. 
 Enhancing Biodiversity - There is scope for a management plan for wildflower
meadow reinstatement. 
6. Phase 1 Projects  
6.1. The Council’s approved budget for 2025/2026 includes an allocation of £0.800 million
towards the reinstatement of the White Bridge, Chatelherault’s Phase 1 project.  In
addition, Facilities, Waste and Grounds have a budget of £0.200 million giving a total
project budget of £1 million. 
6.2. To secure continuation of service in relation to the Masterplan exercise, the Council
has appointed TTPM to manage the delivery of this project through Royal Institute of
British Architects (RIBA) Plan of Work stages 3 to 7.   
6.3 The White Bridge project is still in the early stages of development with project scope,
cost and viability being determined.  There are a number of technical issues
challenging this project including new regulations imposed by the Scottish
Environment Protection Agency which the team are working through.   
7. Employee Implications
7.1. The project has been supported by officers in Enterprise and Sustainable
Development (ESD), with input from colleagues across Community and Enterprise
Resources and SLLC. 
7.2. Delivery of the Phase 1 project is also being supported by ESD employees. 
8. Financial Implications
8.1. The Council’s approved budget for 2025/2026 includes an allocation of £0.800 million
towards the reinstatement of the White Bridge, Chatelherault’s Phase 1 project. In
addition, Facilities, Waste and Grounds have a budget of £0.200 million giving a total
project budget of £1 million.  
9

Page 10

8.2 The completed Masterplan and supporting intelligence will be used to pursue
significant external investment in Council assets and support external funding bids to
a range of sources including UK Government, Scottish Government, Heritage Lottery
Fund etc.   
9. Climate Change, Sustainability and Environmental Implications
9.1. The proposed projects have a strong net zero focus and will contribute towards the
Council’s Sustainable Development and Climate Change Strategy.
10. Other Implications
10.1. The masterplan sets the vision for investment in Chatelherault Country Park over the
next 10 years.  The investment required is significant and will be reliant on the Council
securing external funding.  
11. Integrated Impact Assessment and Consultation Requirements
11.1. An Integrated Impact Assessment has been undertaken, and can be found on the
Council’s website via Chatelherault Country Park Masterplan IIA 
11.2. Consultation has been ongoing throughout the development of the Masterplan
including two rounds of public engagement, in Summer 2024 and Summer 2025.  As
investment proposals are further developed, additional consultation including the
establishment of a stakeholder group will be undertaken.   
Kevin Carr  
Executive Director (Community and Enterprise Resources) 
13 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs 
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 We will work towards a sustainable future in sustainable places.
 People live the healthiest lives possible.
 Caring, connected, sustainable communities 
Previous References
 Chatelherault and Calderglen Country Parks Masterplans and associated Phase 1
Projects, Community and Enterprise Committee, 7 October 2025 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Pauline Crisp, Team Leader  
Enterprise and Sustainable Development Services 
pauline.crisp@southlanarkshire.gov.uk 
10

Page 11

Update for Hamilton Area Committee 
Participatory Budgeting 2025/2026 – Update for Area Committee
Service Area Estate Improvement
Budget/HIP
Environmental
Programme
Lead Officer David Edgar, Area Housing Manager 
Stage 1: Pre-Consultation
• What are we asking the public for their view on (what service is it / description etc)? 
• How much funding are we asking about? 
• Who are we asking, 
• How are we doing this?  
• When are we doing this?
• When will we report back? 
Estate Improvement Budget 
The Estate Improvement Budget totals £40,000 and is split evenly across the 4 housing divisions
of South Lanarkshire.  Each Local Housing Management Team can direct the funding towards
projects or improvements highlighted as a priority by customers.  Although limited in value, the
budget is ideally suited to a participatory budgeting approach as it often funds a number of smaller
projects that are important to customers and can affect their quality of life. 
Following discussions with local tenants, five projects have been delivered within the Hamilton
division so far in relation to: 
• Preventing dumping of waste at Meikle Earnock Road
• Renewing fencing at Furnace Road
• Installing bollard at William Drive/Jeanette Avenue
• Removing overgrown trees at Duncan Graham Street
• Replacing fencing at Castle Street/Grammar School Square 
Housing Revenue Account budget for 2025/2026 - Housing Investment Programme
Engagement with tenants on the overall Housing Revenue Account budget for the 2025/2026
period, and the proposed level and focus of the Housing Investment Programme, took place as
part of the annual resource budgetary consultation process, which included a series of focus
groups and meetings with customers, and an online survey that received 1,335 responses.  The
Environmental aspect of the Housing Investment Programme (the ‘Environmental Programme’) is
a significant budget area that covers a wide range of projects that seek to improve the quality and
energy efficiency of the council’s domestic housing stock. 
Examples of projects within this budget area can include replacement doors and windows within
properties, or redevelopment of communal areas in multi-storey buildings or sheltered housing
facilities.  Not all projects included within this budget area are suitable for a participatory budgeting
approach, however for those that are officers will ensure the required element of choice and
voting opportunities are offered to customers and appropriately recorded. 
To date, one participatory budgeting project is underway in the Hamilton division: 
• Ongoing improvements at the Shawlands Crescent Gypsy/Traveller site in line with the
Masterplan developed in partnership with residents. 
5
11

Page 12

Stage 2: Post Consultation
• The outcome of the PB activity 
• What happens next? 
• Further reporting requirements (eg required Committee approval)  
Estate Improvement Budget
To date, £7,776 from the  Estate Improvement Budget has been spent in the Hamilton division
during 2025/2026 on a range of tenant priorities. 
• In response to feedback from residents in Meikle Earnock Road about a common area
being used to dump unwanted items, a new gate and fencing was installed to prevent
access to the area.
• Following contact from residents in Furnace Road, Quarter, the fencing at the playpark
was renewed.
• In response to discussions with residents in Duncan Graham Street in Larkhall, overgrown
trees were removed and new secure fencing installed.
• Following feedback from residents in Castle Street and Grammar School Square, fencing
at a pathway linking properties was replaced.
• In response to problems highlighted by residents at William Drive and Jeanette Avenue
about fly tipping, a bollard was installed to prevent access. 
Following engagement with tenants about the condition of closes in blocks on Glasgow Road
plans are underway to use the remainder of the Estate Improvement Budget for close cleaning. 
Housing Revenue Account budget for the 2025/2026 - Housing Investment Programme 
Shawlands Crescent Gypsy/Traveller site
Following consultation with Shawlands Crescent through site meetings and individual discussions,
it was agreed that the next stage of improvement works on the site would focus on a programme
of amenity unit extensions.  This work is almost complete, with the remaining pitches due to be
finished by end March 2026.  The total costs of the project to date in 2025/2026 are £283,145.53.   
Officers from Housing and Technical Resources will continue to take forward opportunities within
Hamilton to ensure tenants and other customers can determine the outcome of budgets within the
Environmental Programme and Estate Improvement Budget, with further updates provided to
Committee. 
12

Page 13

Photographs – Installing bollard at William Drive/Jeanette Avenue – 
13

Page 14

14

Page 15

15

Page 16

16

Page 17

Report
Agenda Item 
Report to: Hamilton Area Committee  
Date of Meeting: 11 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Hamilton Common Good - Update Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide background information and update on the Hamilton Common Good Fund
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the background information and update on Hamilton Common Good Fund
be noted.
[1recs]
3. Background
3.1. The Common Good is a fund of money or assets or both and is administered by a
Scottish local authority in respect of each former burgh within the area of the local
authority. 
3.2. Common Good property is owned by the local authority although it is administered
separately from other local authority assets for accounting purposes.  Ownership is
absolute in the strict sense that the authority holds legal title to it.  However, what the
authority can do with the asset is subject to a system of statutory control.  This control
has the potential to limit the extent to which the authority can dispose of or deal with
the asset and on what terms. 
3.3. The Common Good funds held within South Lanarkshire Council are Lanark, Biggar,
Hamilton and Rutherglen.  The Hamilton Common Good Account holds a number of
properties.  A proactive approach to maintenance supports the viability of these assets
and reduces the risk to greater liability in the future. 
3.4. The Council’s Finance and Corporate Resources (FCR) Committee, at its meeting on
2 October 2013, approved an annual cyclical maintenance plan of £15k for Hamilton
Common Good properties.  The Executive Director (Finance and Corporate
Resources) has delegated authority to approve maintenance work up to the value of
£15,000 for each fund.  If inspections highlight requirements to undertake investment
which would be beyond routine maintenance, this will be considered separately for
approval and will be the subject of a report to the FCR Committee.   
3.5. This report will provide details of the management and administration of the Common
Good funds (sections 4 and 5).   
6
17

Page 18

3.6. Accounts for the Common Good are prepared on an annual basis, as part of the
Council’s year end process.  The position for the year ended 31 March 2025 is detailed
in section 6. 
3.7. An up-to-date position, including planned maintenance and committed projects, is
included in section 7 and 8. 
4. Administration of Common Good
4.1. Finance Services administer the Common Good Fund.  This includes revenue
monitoring, preparation of annual accounts and seeking Committee approval for
expenditure to be incurred on various projects as and when they are required. 
4.2. If any proposals for common good spend are considered to benefit the local
community in Hamilton, and the level of funding required is feasible, then Finance
Services will seek approval from the FCR Committee. 
4.3. A Common Good Update report is presented to the FCR Committee at least twice a
year. 
5. Role of South Lanarkshire Council’s Elected Members
5.1. Decisions on the Common Good Funds are considered by the Council’s FCR
Committee.  Elected Members are kept up to date with any issues affecting the
Common Good and are involved in the consideration of approving spend from the
Account.  A report on the management of the Hamilton Common Good Fund will be
provided annually to the Hamilton Area Committee. 
6. Common Good Annual Accounts 2024/2025
6.1. Appendix 1 to the report shows the audited accounts for 2024/2025. These form part
of the Council’s accounts that were approved at the Risk and Audit Scrutiny Committee
on 30 September 2025. 
6.2. The Appendix shows that as at the end of 2024/2025, the Balance Invested in South
Lanarkshire Council’s Loans Fund for Hamilton is £0.775 million.  This is the cash that
is held by the Council on behalf of the Common Good funds, and which is readily
available to meet expenditure. 
7. Hamilton Common Good Fund
7.1. 2024/2025 Year-end position:  The Hamilton Common Good Fund holds both assets
and cash.  As noted in section 6.2, (and Appendix 1) the balance invested in South
Lanarkshire Council’s Loans Fund (cash balances available to spend) is £0.775 million
and is the Hamilton Common Good Fund’s investment balance.   
7.2. As well as cash balances, the Hamilton Common Good Fund also holds assets.  These
are detailed in Appendix 2.   
7.3. Expenditure is incurred on the upkeep of Hamilton Common Good Assets and cash
balances available can be considered for spend on specific projects.  Income is
generated from rent of particular assets.  A summary of the Income and Expenditure
for 2024/2025 is shown in Table 1. 
18

Page 19

Table 1 - Hamilton Common Good - Income and Expenditure 2024/2025   
£000
Income 
Rental Income from various properties 223
Interest Received 30
Total Income 253  
Expenditure 
Repairs and Maintenance (Section 7.4) 5
Administration of Common Good Account 4
Payments to Other Bodies (Section 7.5) 67
Depreciation and Revaluation Losses 20
Total Expenditure 96  
Net Surplus for Year 157 
7.4. The cost of Repairs and Maintenance incurred during 2024/2025 was a request for
funding to refurbish the entrance gates for the children’s play park entrance at Bothwell
Road Park.  This was approved under delegated authority from the planned
maintenance budget for 2024/2025.  Works have been carried out at a cost of £4,860. 
7.5. The Payments to Other Bodies costs incurred during 2024/2025 includes contributions
to Grants to Voluntary Organisations, Contributions to Civic Events and Ground
Maintenance. 
8. Hamilton Repairs and Maintenance Budget – Planned Maintenance 2025/2026
8.1. As noted in 3.4. an annual budget of £15,000 is available for the maintenance of
Common Good properties in Hamilton. 
8.2. There are two commitments against this planned maintenance budget for 2025/2026
as noted below: 
8.3. Cadzow Glen:  Funding of £4,680 was approved to cover the costs incurred for repairs
to the footpath and bridge at Cadzow Glen which are now complete. Removal of the
old boardwalk will cost a maximum of £3,000 and has been approved through
delegated authority. 
8.4. Gatehouse, 65 Bothwell Road Investigate flooding on main entrance pathway: A
cost of £1,750 has been approved, in order to carry out investigative work to identify
the cause of flooding on the main entrance pathway to the property. The property is
currently leased out. 
9. Hamilton Common Good – Additional Funding Requests / Update
9.1. Requests for funding have been received that are either not for repairs and
maintenance or which cannot be approved under delegated authority due to the level
of the expected costs. 
9.2. Former Vogue Bingo Site: The status of this site was reported to the Finance and
Corporate Resources committee in September 2025:  In May 2025, Building
Standards obtained three independent surveys of the structure from different
perspectives (valuation, structure, and heritage) and the conclusion of each report was
that the building is in an unsafe condition and that demolition was recommended.  As
19

Page 20

a result, a Dangerous Building Notice was served on the Council on 17 June 2025 in
line with relevant regulations. 
9.3. The Dangerous Building Notice gives the option to reinstate or demolish the facade. 
Given the extent and cost of reinstatement required, coupled with the fact that securing
development on the site has historically been unsuccessful over a period of 28 years,
with interested parties quoting the façade as a barrier to development, demolition was
considered the only feasible option. 
9.4. Following the serving of a Dangerous Building Notice, an application was made to
Historic Environment Scotland (HES) to remove the Listed Building designation
(Grade B). Listed Building Consent was sought for the demolition of the remaining part
of the building.  This was subject to a consultation period which closed on 7 November
2025.   
9.5. No relevant objections were received, and the Listed Building application was
approved. 
9.6. Alongside this statutory process, a demolition contractor was selected through an
appropriate procurement process with budgeted costs estimated at £0.150 million and
approval was granted at the Finance and Corporate Resources committee on 19
November 2025.   
9.7. Given a gap site will be created on completion of the demolition, it is proposed that a
fence and a landscaped edge be created whilst redevelopment options for the site are
considered.  This will be carried out following demolition of the property. 
9.8. Hamilton Town Square: A contribution from Hamilton Common Good fund of £0.100
million was approved in May 2024 by the Finance and Corporate Resources
committee.  An external Project Management Team has been appointed to take the
project forward to the next stage. 
9.9. Hamilton Common Good Fund currently has a cash balance held by the Council, and
which is readily available to meet expenditure of £0.775 million. Excluding the £0.015m
set aside for planned maintenance, £0.760 million is available to meet proposed costs
which may arise, and the approved costs of £0.150 million (section 9.6) and £0.100
million (section 9.8).  This would leave a balance of £0.510 million. 
10. Employee Implications
10.1. None 
11. Financial Implications
11.1. All costs identified will be met from the Hamilton Common Good fund. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
13. Other Implications
13.1. The ongoing repairs and maintenance support the viability of Common Good assets
and reduces the Council’s risk to increased liabilities in the future. 
20

Page 21

14. Integrated Impact Assessment and Consultation Requirements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
14.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
21 January 2026 
Link(s) to Council Values/Priorities/Outcomes
Accountable, effective, efficient and transparent 
Previous References
 Hamilton Area Committee, 18 December 2024 
List of Background Papers
 Finance and Corporate Resources Committee, 10 September 2025
 Finance and Corporate Resources Committee, 19 November 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637  (Tel:  01698 455637)
E-mail:  lorraine.ohagan@southlanarkshire.gov.uk 
21

Page 22

Appendix 1 
2024/2025 Annual Accounts Hamilton 
£000
Income and Expenditure Accounts 
Income for the Year 253
Expenditure for the Year (96)
Surplus / (Deficit) to the Balance Sheet 157  
Balance Sheet 
Fixed Assets  
Property, Plant and Equipment 1,517
Investments 
Advances to South Lanarkshire Council Loans Fund 775
Debtors -
Total Assets 2,292
Current Liabilities 
Creditors (17)
Total Assets less Current Liabilities 2,275  
Represented By: 
Common Good Account 1,526
Surplus / (Deficit) from Income and Expenditure Account 156
Amortisation of Revaluation Reserve 8
Gain / Loss on Revaluation - 
1,690
Revaluation Reserve 
Opening Balance 593
Gain / Loss on Revaluation -
Amortisation of Revaluation Reserve (8)
Closing Balance 585  
Total 2,275 
22

Page 23

Appendix 2
Hamilton Common Good Assets 
Asset Name  Address 
Bothwell Road Public Park Bothwell Road, Hamilton, ML3 0DW
Bothwell Road Public Park Bandstand Bothwell Road, Hamilton, ML3 0DW
Common Green Back Row, Hamilton, ML3 6BW
Former Vogue Bingo Hall / Cinema
(Note 1)
11 Keith Street, Hamilton, ML3 7BL
Gatehouse 65 Bothwell Road, Hamilton, ML3 0DW
Sculptural Walls Old Cross, Hamilton, ML3 6DS
Glass Blocks Old Cross, Hamilton, ML3 6DS
Floral Trumpets Cadzow Glen, Hamilton, ML3 6BW
Library Gates Cadzow Glen, Hamilton, ML3 6HQ
Pyramid Cadzow Glen, Hamilton, ML3 6H
Entrance Feature Cadzow Glen, Hamilton, ML3 6BJ
Watson Fountain Cadzow Street, Hamilton, ML3 6HP
Hamilton Racecourse Bothwell Road, Hamilton, ML3 0DW
Stairwell 92-94 Cadzow Street, Hamilton, ML3 6DS
Hamilton Towers Castle Street, Hamilton, ML3 6BU
Cinema Palace Grounds Road, Hamilton, ML3 6AD
Asda Stores Ltd Palace Grounds Road, Hamilton, ML3 6AD
Retail Park Palace Grounds Road, Hamilton, ML3 6AD
Express by Holiday Inn Keith Street, Hamilton, ML3 7BL
Esporta Ground Lease Mote Hill, Hamilton, ML3 6BY
Gateway Site Palace Grounds Road, Hamilton, ML3 6AD
Backmuir Plantation Bothwell Road, Hamilton, ML3 0EF
Grand Avenue Palace Grounds Road, Hamilton, ML3
Cythera Palace Grounds, Hamilton, ML3 6BY
David Cooper Memorial Palace Grounds, Hamilton, ML3 6BY
Railing Design Back Row, Hamilton, ML3 6BW
Sandstone Abstract Cadzow Glen, Hamilton, ML3 6B
Sandstone Tomb Cadzow Glen, Hamilton, ML3 6BA
Wash Day Cadzow Glen, Hamilton, ML3 6BL
The Cadzow Cow Cadzow Glen, Hamilton, ML3 6B
Railing Design Cadzow Glen, Hamilton, ML3 6PA
Union Street Entrance Gate Cadzow Glen, Hamilton, ML3 6PA
Art Trail Direction Plaque Cadzow Glen, Hamilton, ML3 6BJ
Four Youths Quarry Street, Hamilton, ML3 7AR
Music Project Quarry Street, Hamilton, ML3 7AH
Red Measures Quarry Street, Hamilton, ML3 6AH
Railing Design Quarry Street, Hamilton, ML3 7DT
Gazebo Quarry Street, Hamilton, ML3 7AH
Light Heavyweight Town Square, Hamilton, ML3 6AD
Totem Town Square, Hamilton, ML3 6AD
Square Stars Town Square, Hamilton, ML3 6BU
Cadzow Glen Local Nature Reserve Cadzow Street, Hamilton, ML3 
Note 1 Demolition of the Vogue bingo site is underway.  The asset extents will be updated to land only when complete.
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Hamilton Area Committee
Date of Meeting: 11 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Hamilton
Area Committee to 2 December 2026
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the
Hamilton Area Committee to 2 December 2026, attached as an appendix to
the report, be noted.
[1recs]
3. Background
3.1. Following discussion with the Chairs of the 4 Area Committees, it was agreed that a
list of items proposed for consideration at subsequent meetings be provided to afford
an opportunity for members to inform future agendas.  The outline forward
programme for Hamilton Area Committee to 2 December 2026 is attached, for
members’ information, as an appendix to the report. 
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
7
25

Page 26

8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
19 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Laura Cunningham, Administration Officer
Tel:  07385 370 044
E-mail:  laura.cunningham2@southlanarkshire.gov.uk 
26

Page 27

APPENDIX 
HAMILTON AREA COMMITTEE OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility   
29 April 2026 South Lanarkshire Leisure and
Culture (SLLC) Update 
SLLC 
Community Grants  Finance and Corporate
Resources 
24 June 2026 Playscheme Grants  Finance and Corporate
Resources 
Community Grants  Finance and Corporate
Resources 
23 September 2026 Community Engagement Update Jennifer Kerr 
Annual Housing and Homelessness
Update 2025/2026
Housing and Technical
Resources 
Community Grants Finance and Corporate
Resources   
2 December 2026 Police Scotland Presentation
Community Grants
Police Scotland
Finance and Corporate
Resources   
Note:- Education Scotland Inspection Reports will come to Committee as and when they
are available 
27

Page 28

28

Page 29

. Report
Agenda Item 
Report to: Hamilton Area Committee
Date of Meeting: 11 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval for the allocation of community grants to 6 community groups in
the Hamilton Area Committee area from the 2025/2026 community grant budget 
 request authorisation for the Executive Director (Finance and Corporate
Resources), in consultation with the Chair, to approve further community grant
applications meeting the relevant criteria in the period to 31 March 2026 from the
2025/2026 budget 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that community grants be awarded as follows:- 
(a) Applicant:  Hamilton Caledonian Bowling Club Male
Voice Choir (HA/24/25)   
Purpose of Grant:   Outing 
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £650   
Total Eligible Grant Applied for: £650   
Recommendation:  £300 (Outing)     
Amount Awarded:  To be determined by the Committee 
(b) Applicant:  Dalserf Village Garden Club, Larkhall
(HA/27/25)   
Purpose of Grant:  Environmental project   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £350   
Total Eligible Grant Applied for: £350   
Recommendation:  £210 (60% of £350)   
Amount Awarded:  To be determined by the Committee 
(c) Applicant:  Skate Rite, Blantyre (HA/28/25)   
Purpose of Grant:  Start-up costs – Equipment and
administration and publicity     
Identified Community Benefits: Our children and young people thrive   
Estimated Cost:  £1,000   
Total Eligible Grant Applied for: £1,000   
Recommendation:  £300 (Start-up)     
Amount Awarded:  To be determined by the Committee
8
29

Page 30

(d) Applicant:  Uddingston Old Parish Church Monday
Club (HA/29/25)   
Purpose of Grant:  Outing   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £540   
Total Eligible Grant Applied for: £540   
Recommendation:  £300 (Outing)   
Amount Awarded:  To be determined by the Committee 
(e) Applicant:  St John Ogilvie High School PTA,
Hamilton (HA/31/25)   
Purpose of Grant:   Equipment 
Identified Community Benefits: Our children and young people thrive   
Estimated Cost:  £1,000   
Total Eligible Grant Applied for: £1,000   
Recommendation:  £600 (60% of £1000)     
Amount Awarded:  To be determined by the Committee 
(f) Applicant:  Cadzow Community Corps, Hamilton
(HA/32/25)   
Purpose of Grant:  Equipment and materials   
Identified Community Benefits: People live the healthiest lives possible   
Estimated Cost:  £415   
Total Eligible Grant Applied for: £415   
Recommendation:  £250 (60% of £415 rounded up)   
Amount Awarded:  To be determined by the Committee 
(2) that the Executive Director (Finance and Corporate Resources), in consultation
with the Chair, be authorised to approve any further community grant
applications meeting the relevant criteria in the period to 31 March 2026 from
the 2025/2026 budget 
3. Background
3.1. The Council operates a community grants scheme to support local constituted
community groups and voluntary organisations.  All applications require to be
supported by a constitution, audited accounts or annual income and expenditure
accounts, a bank statement, and confirmation that the group/organisation will adhere
to the conditions of the grant award.  Applications are invited continually throughout
the year. 
3.2. The main aims of the community grants scheme are to:- 
 fund activities and projects which bring community benefit
 involve people in the community by bringing them together to enjoy educational,
recreational, leisure and other community activities or to improve the local
environment 
3.3. Support can be provided for a range of activities including administration and
publicity costs, purchase of equipment and materials, annual outings and entrance
fees, start-up costs and special events. 
4. Employee Implications
4.1. None. 
30

Page 31

5. Financial Implications
5.1. The current position of the community for the Hamilton Area Committee area in
2025/2026 is as follows: - 
Total allocation for Community Grants £25,750
Community grants previously allocated £8,610
Community grants allocated in this report £1,960
Remaining balance £15,180 
5.2. In view of the fact that this is the last meeting of the Committee in the current
financial year, and to allow any further applications submitted prior to the end of the
current financial year to be considered, it is proposed that the Executive Director
(Finance and Corporate Resources), in consultation with the Chair, be authorised to
approve any further community grant applications meeting the relevant criteria in the
period to 31 March 2026.  Information on those grants awarded would be reported to
a future meeting. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The risk to the Council is that grant funding is not utilised for the purpose of which it
was intended.  This risk is mitigated by internal controls including audit procedures
and conditions of grant agreement. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
8.2. All the necessary consultation with the community groups has taken place. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
27 January 2026 
Link(s) to Council Values/Priorities/Outcomes
♦ Accountable, effective, efficient, and transparent
♦ We will work towards a sustainable future in sustainable places
♦ Caring, connected, sustainable communities 
Previous References
 Hamilton Area Committee – 12 November 2025 
List of Background Papers
 Individual application forms 
31

Page 32

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Geraldine Wilkinson, Clerical Assistant 
Ext:  4818 (Tel:  01698 454818)
E-mail:  geraldine.wilkinson@southlanarkshire.gov.uk 
32