Democracy Spraffa

Agenda Document Pack - Employee, Equalities, Diversity and Inclusion Forum - 27/08/2025

South Lanarkshire Council · 27 August 2025
Back to Employee, Equalities, Diversity and Inclusion Forum — 27 August 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 19 August 2025 
Dear Councillor 
Employee, Equalities, Diversity and Inclusion Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Wednesday, 27 August 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Walter Brogan, Janine Calikes, Ross Clark, Margaret Cowie, Grant Ferguson, Ross Lambie,
Catherine McClymont, Mark McGeever, Mo Razzaq, Kirsten Robb 
Substitutes
Mathew Buchanan, Poppy Corbett, Cal Johnston-Dempsey, Gavin Keatt, Katy Loudon, Norman
Rae
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Employee, Equalities, Diversity and Inclusion
Forum held on 28 May 2025 submitted for approval as a correct record.  (Copy
attached) 
3 - 6 
Item(s) for Consideration 
3 Council-Wide Workforce Monitoring - 1 April to 30 June 2025
Report dated 28 July 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
7 - 26 
4 Community and Enterprise Resources - Workforce Monitoring - 1 April to
30 June 2025
Joint report dated 28 July 2025 by the Executive Directors (Finance and
Corporate Resources) and  (Community and Enterprise Resources).  (Copy
attached) 
27 - 34 
5 Annual Report on Mainstreaming Equalities and Diversity 2024/2025 -
Community and Enterprise Resources
Report dated 23 July 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
35 - 56 
6 Just Transition - Transitioning to a Post-Carbon Society
Presentation by A Wallace, Sustainability Adviser, Enterprise and Sustainable
Development Services. 
7 Forward Programme for Future Meetings
Verbal update by  A Floyd, Learning and Development Adviser, Finance and
Corporate Resources. 
Urgent Business 
8 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Ishara Opatha
Clerk Telephone: 07385 370069
Clerk Email: ishara.opatha@southlanarkshire.gov.uk 
2

Page 3

EMPLOYEE, EQUALITIES, DIVERSITY AND INCLUSION FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 28 May 2025 
Chair:
Councillor Mo Razzaq 
Councillors Present:
Councillor Walter Brogan, Councillor Janine Calikes, Councillor Ross Clark, Councillor Margaret
Cowie (Depute), Councillor Grant Ferguson, Councillor Catherine McClymont, Councillor Kirsten
Robb 
Councillors' Apologies:
Councillor Ross Lambie, Councillor Mark McGeever 
Attending:
Finance and Corporate Resources
A Bell, Team Leader, Consultation, Organisational Development and Equality; T Ferguson,
Learning, Organisational Development and Diversity Manager; S Jessup, Administration Assistant;
E Maxwell, HR Business Manager; I Opatha, Administration Officer; T Slater, Administration Adviser
Health and Social Care/Social Work Resources
A Brown, Telecare Programme Lead; K Glancy, Telehealth Programme Lead; M Kane, Service
Development Manager; J O’Boyle, Technology Enabled Care Service Manager; B Perrie, Planning
and Performance Manager 
Also Attending:
M Kennedy, NASUWT; J Lennon EIS; T Slaven, UNISON 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Employee, Equality, Diversity and Inclusion Forum held on 12
March 2025 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Council-wide Workforce Monitoring – 1 January to 31 March 2025 
A report dated 24 April 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the following Council-wide employee information for the period 1 January to 31
March 2025. 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 8 March 2025
2
3

Page 4

Officers responded to a member’s questions in relation to the attendance statistics. 
The Forum decided: that the report be noted. 
[Reference: Minutes of 12 March 2025 (Paragraph 3)] 
4 Social Work Resources’ Workforce Monitoring – January to March 2025
A joint report dated 29 April 2025 by the Executive Director (Finance and Corporate Resources)
and the Director, Health and Social Care was submitted on the following employee information
for Social Work Resources for the period January to March 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 8 March 2025 
The Forum decided: that the report be noted. 
[Reference: Minutes of the Employee Issues Forum of 5 March 2024 (Paragraph 4)] 
5 Annual Report on Mainstreaming Equalities and Diversity – Social Work
Resources 2023/2024
A report dated 5 March 2025 by the Director, Health and Social Care was submitted advising of
the strategic and operational work being undertaken by Social Work Resources to meet the
commitments within ‘South Lanarkshire Working for You’ Mainstreaming Equalities Report 2021
to 2025. 
The Council Plan 2022 to 2027, Connect, set out the Council’s objective to deliver a range of
outcomes for the benefit of everyone in South Lanarkshire.  There were 6 outcomes, with Social
Work Resources focusing mainly on the following 3:- 
 Health and Wellbeing – people live the healthiest lives possible
 Children and Young People – our children and young people thrive
 Communities and Environment – caring, connected, sustainable communities 
The statutory framework for social work services was contained in a raft of legislation.  Principal
among those, was the Social Work (Scotland) Act 1968 which placed a duty on all local
authorities to “promote social welfare”.  Social workers had a distinctive set of knowledge, skills
and values when supporting the most vulnerable people and ensuring that their needs were met
without discrimination. 
Many of the services that were delivered to the public were set out in statute and, therefore, the
majority of direct service delivery had to comply with the respective legislative framework.  It was
this framework that provided the basis of the Social Work Service, working alongside the South
Lanarkshire University Health and Social Care Partnership (South Lanarkshire University HSCP)
to reduce inequality and provide effective care to meet the needs of vulnerable people in South
Lanarkshire.  The areas of work the targeted service focused on were detailed in paragraph 3.3
of the report.
4

Page 5

The Council and the South Lanarkshire Integration Joint Board (IJB) also recognised the
immense pressure faced by households across South Lanarkshire as they were experiencing
the worst cost-of-living crisis in 40 years.  Additional demands continued to be placed upon
services as supports were offered to help households manage scarce resources and maintain
support. 
Social Work Resources participated in the Council’s Equality and Diversity Working Group and,
along with other Resources, had developed equality outcomes that met the general duty as set
out in the Equality Act 2010 as follows:- 
 to eliminate discrimination
 to advance equality of opportunity
 to foster good relations in all the work we do 
During 2023/2024, there were no complaints recorded by Social Work Resources under the
equalities category. 
The Resource reported progress against 4 of the Council’s outcomes within the ‘Mainstreaming
equalities progress report 2019 to 2021 and Mainstreaming equalities report 2021 to 2025 and
those were fully detailed at section 5 of the report under the following headings:- 
 increase the number of people from ethnic backgrounds employed in the Council
workforce to reflect the diversity of the South Lanarkshire population
 older people, those from vulnerable groups and individuals who live alone are protected
from scams and nuisance calls and their wellbeing is improved through increased
awareness and preventative action
 counselling through schools’ service is accessible for all children/young people aged 10
and over
 improve health, care and wellbeing for the most vulnerable in our communities 
Over the course of 2023/2024, the Resource carried out Equality Impact Assessments (which
pre-dated Integrated Impact Assessments), which included Equipment and Adaptations and The
Richmond Fellowship Scotland (TRFS) Connect Services. 
The Planning and Performance Manager responded to a member’s question in relation to the
Unpaid Work Service and, where information was not readily available, undertook to provide this
to the relevant member. 
The Forum decided: that the report be noted. 
[Reference: Minutes of the Equal Opportunities Forum of 27 February 2024 (Paragraph 4)] 
6 Technology-Enabled Care
A presentation on Technology Enabled Care (TEC) was delivered by the following officers:- 
 J O’Boyle, TEC Service Manager, South Lanarkshire University Health and Social Care
Partnership (SLUHSCP)
 K Glancy, Telehealth Programme Lead, SLUHSCP 
 A Brown, Telecare Programme Lead, Social Work Resources 
Information was provided on:- 
 the TEC team, which was an integrated health and social care work team
 the 3 programmes delivered by the TEC team which included:-
5

Page 6

 telecare (South Lanarkshire)
 telehealth (pan-Lanarkshire)
 innovations and solutions
 key priorities of the TEC Team which included:-
 Care Surround (Amazon Healthcare)
 patient/service user engagement
 digital inclusion
 the TEC Zone
 connected care homes
 the TEC roadmap
 a human impact story 
Officers responded to a member’s question in relation to support for Deaf BSL users to
effectively use the technology. 
The officers were thanked for their informative presentation. 
The Forum decided: that the presentation be noted 
7 Mainstreaming Equality – Equality Outcome One: Increase Ethnic Minority
Representation Action Plan 2025 to 2029 
An action plan was submitted on Equality Outcome One ‘increasing ethnic minority
representation’ which supported the Mainstreaming Equalities Outcomes for 2025 to 2029. 
Detailed information was provided in the action plan on the following areas which aimed to
improve the ethnic minority representation in the Council:- 
 action 1 – reviewing recruitment processes
 action 2 – training for recruitment panels
 action 3 – diversification of interview panels
 action 4 – enhancing advertising
 action 5 – collaborating with community organisations 
There followed a discussion during which members welcomed the engagement with community
organisations. 
The Team Leader, Consultation, Organisational Development and Equality responded to
UNISON’s representative in relation to past and future engagement with trades unions for this
work. 
The Chair, on behalf of the Forum, congratulated officers for the work to date to develop the
action plan. 
The Forum decided: that the action plan be noted 
8 Urgent Business 
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Employee, Equalities, Diversity and Inclusion Forum 
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council-wide Workforce Monitoring – 1 April to 30 June
2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
  provide employment information relating to the Council for the period 1 April to
30 June 2025
[1purpose] 
2. Recommendation(s)
2.1. The Employee, Equalities, Diversity and Inclusion Forum is asked to approve the
following recommendation(s):-
[recs]
(1) that the following employment information for the period 1 April to 30 June 2025
relating to the Council be noted: - 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 Staffing Watch as at 14 June 2025
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Employee, Equalities, Diversity and Inclusion
Forum.  This report for the Council provides information on the position for the period
1 April to 30 June 2025. 
4. Attendance Statistics
4.1. Information on absence statistics for the Council and each Resource, as analysed for
June 2025, is provided in Appendices 1 to 8.  Points to note are:- 
The Council’s absence rate for June 2025, shown in Appendix 1, is 5.4% which
represents a decrease of 0.2% when compared to the previous month and an
increase of 0.2% when compared to June 2024. 
When compared to June 2024, the APT&C absence rate has increased by 0.3%, the
teachers’ figure has increased by 0.1% and the manual workers’ figure has
increased by 0.3%. 
3
7

Page 8

Based on annual trends and the absence rate to June 2025, the average absence
rate for the Council for the financial year 2025/2026 is 6%. 
In comparison to June 2024 (Appendix 8):- 
 psychological and musculoskeletal conditions are the main reasons for 
 absence
 total days lost due to psychological conditions have increased by 159 days
 total days lost due to musculoskeletal conditions have increased by 11 days 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken.   
5. Occupational Health
5.1. Information on Occupational Health for the period 1 April to 30 June 2025 is provided
in Appendix 9:- 
 during the period, there were 520 employees referred for a medical examination,
which is an increase of 50 when compared to the same period last year.  Both
musculoskeletal and psychological conditions continue to be the main reasons for
medical referrals
 a total of 466 employees attended physiotherapy treatment, showing a decrease
of 86 when compared to the same period last year.  Of the 466 employees
referred, 73% remained at work whilst undertaking treatment
 during this period, 423 employees were referred to the Employee Support Officer,
showing a decrease of 23 when compared with the same period last year.  Of the
referrals made this period, 86% related to personal reasons
 121 employees were referred to the PAM Assist counselling service this period,
showing a decrease of 45 when compared with the same period last year.  All the
referrals made this period were made directly by employees.  Personal reasons
accounted for 14% of the referrals made, 16% were for work related reasons and
70% was for other reasons
 53 employees were referred for Cognitive Behavioural Therapy this period, an
increase of 49 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident report for 1 April to 30 June 2025 is contained in Appendix 10 
 the number of accidents/incidents recorded was 410.  Of those, 388 have been
investigated and categorised 22 are still in process of being investigated
 of those investigated, no specified injuries were recorded
 of those investigated, there were 386 minor accidents/incidents
 of those investigated, there were no accidents that resulted in an absence lasting
over 3 days
 of those investigated, there were 2 accidents that resulted in an absence lasting
over 7 days
8

Page 9

7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals
7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation
Referrals for 1 April to 30 June 2025 is contained in Appendices 11 and 12. 
During the period:- 
 a total of 66 disciplinary hearings were held across Resources within the Council,
this figure has increased by 27 when compared to the same period last year
 action was taken in 64 of these cases.  No appeals were raised against the
outcomes
 our target is to convene disciplinary hearings within 6 weeks, 73% of hearings
met this target
 1 appeal was received and is currently scheduled to be heard by the Appeals
Panel
 10 grievances were submitted, all of which are currently being investigated
 5 Dignity at Work complaints were raised, all of which are currently being
investigated
 no referrals for mediation were submitted 
8. Analysis of Leavers and Exit Interviews
8.1. Information on the number of leavers and exit interviews for the period 1 April to 30
June 2025 is contained in Appendix 13.  Exit interviews are conducted with
employees who leave voluntarily. 
Labour Turnover 
Using information compiled from Resources and Staffing Watch information as at 14
June 2025, the Council’s turnover figure for April to June 2025 is as follows:- 
113 leavers eligible for exit interviews/15,588 employees in post = Labour Turnover
of 0.7%. 
Based on the figure at June 2025, the annual labour turnover figure for the financial
year 2025/2026 for the Council is 2.9%. 
8.2. Analysis of Leavers and Exit Interviews:- 
 113 employees left the Council that were eligible for an exit interview, this is a
decrease of 27 when compared with the same period last year
 a total of 24 exit interviews were conducted which is a decrease of 19 when
compared with same period last year 
9. Recruitment Monitoring
9.1. Information on Recruitment Monitoring for 1 April to 30 June 2025 is contained within
Appendix 14. 
9

Page 10

From an analysis of Equal Opportunities Monitoring Forms, the main points to note
are:- 
 overall, 7,262 applications and 7,236 completed Equal Opportunities Monitoring
Forms were received
 of those applicants who declared themselves as disabled (392), 222 were
shortlisted for interview and 20 were appointed
 of those applicants of a black/ethnic minority background (660), 204 were
shortlisted for interview and 17 were appointed
 of those applicants who are veterans (71), 12 were shortlisted for interview and 3
were appointed 
10. Staffing Watch
10.1. There has been a decrease of 31 in the number of employees in the post from 8
March 2025 to 14 June 2025.  Details of the Staffing Watch are contained in
Appendix 15. 
11. Employee Implications
11.1. There are no implications for employees arising from the information presented in
this report. 
12. Financial Implications
12.1. All financial implications are accommodated within existing budgets. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no climate change, sustainability or environmental implications arising
from the information presented in this report. 
14. Other Implications
14.1. There are no implications for risk in terms of the information contained within this
report. 
15. Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
15.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
28 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others
10

Page 11

Previous References
 Employee, Equalities, Diversity and Inclusion Forum – 28 May 2025  
List of Background Papers
 Monitoring information provided by Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
11

Page 12

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.2 5.2 6.0 April 2.8 2.9 3.5 April 7.0 7.3 7.3 April 5.1 5.2 5.7
May 5.1 5.4 5.6 May 3.2 3.0 3.8 May 6.2 7.1 7.4 May 5.1 5.3 5.6
June 4.9 5.3 5.6 June 2.2 2.8 2.9 June 6.5 7.2 7.5 June 4.7 5.2 5.4
July 4.0 4.3 July 1.1 1.0 July 5.8 6.3 July 3.8 4.1
August 4.2 4.6 August 1.3 1.9 August 6.2 7.5 August 4.1 4.7
September 5.2 6.2 September 2.9 3.5 September 7.6 8.3 September 5.3 6.1
October 5.2 6.3 October 2.7 3.8 October 7.1 7.7 October 5.1 6.0
November 6.1 7.0 November 4.3 5.0 November 8.1 8.4 November 6.2 6.9
December 6.7 7.1 December 4.8 5.4 December 7.8 8.5 December 6.6 7.0
January 5.8 6.8 January 4.8 4.9 January 7.8 8.3 January 6.1 6.7
February 6.3 7.0 February 4.9 4.9 February 8.0 9.0 February 6.4 7.0
March 6.3 7.0 March 4.1 4.5 March 8.1 8.4 March 6.3 6.8
Annual Average 5.4 6.0 6.1 Annual Average 3.3 3.6 3.8 Annual Average 7.2 7.8 7.9 Annual Average 5.4 5.9 6.0
Average Apr-Jun 5.1 5.3 5.7 Average Apr-Jun 2.7 2.9 3.4 Average Apr-Jun 6.6 7.2 7.4 Average Apr-Jun 5.0 5.2 5.6
7234 3999 4407 15640
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Council Wide
APT&C Teachers
No of Employees at 30 June 2025 No of Employees at 30 June 2025
Manual Workers Council Wide
No of Employees at 30 June 2025 No of Employees at 30 June 2025
12

Page 13

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7
May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6
June 4.3 4.1 3.6 June 5.9 6.4 7.4 June 5.7 6.0 6.8 June 4.7 5.2 5.4
July 2.3 3.8 July 4.6 4.5 July 4.3 4.4 July 3.8 4.1
August 3.0 3.4 August 5.2 6.2 August 4.9 5.7 August 4.1 4.7
September 2.5 3.8 September 7.1 7.5 September 6.4 6.9 September 5.3 6.1
October 2.0 4.2 October 7.0 7.2 October 6.3 6.7 October 5.1 6.0
November 2.6 3.6 November 8.1 8.3 November 7.3 7.6 November 6.2 6.9
December 3.0 3.8 December 7.5 8.1 December 6.8 7.4 December 6.6 7.0
January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7
February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0
March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8
Annual Average 3.2 3.7 3.6 Annual Average 6.8 7.2 7.4 Annual Average 6.2 6.6 6.8 Annual Average 5.4 5.9 6.0
Average Apr-Jun 3.9 3.5 3.2 Average Apr-Jun 6.2 6.5 7.3 Average Apr-Jun 5.9 6.1 6.7 Average Apr-Jun 5.0 5.2 5.6
578 2853 3431 15640
Resource Total
No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025
Appendix 2
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Community and Enterprise Resources
APT&C Council WideManual Workers
13

Page 14

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.0 5.4 6.8 April 2.8 2.9 3.5 April 3.8 4.0 4.9 April 5.1 5.2 5.7
May 5.4 6.0 6.6 May 3.2 3.0 3.8 May 4.2 4.4 5.0 May 5.1 5.3 5.6
June 4.8 5.5 6.3 June 2.2 2.8 2.9 June 3.4 4.1 4.4 June 4.7 5.2 5.4
July 3.4 3.2 July 1.1 1.0 July 2.2 2.0 July 3.8 4.1
August 4.0 3.9 August 1.3 1.9 August 2.5 2.8 August 4.1 4.7
September 5.9 6.6 September 2.9 3.5 September 4.3 4.9 September 5.3 6.1
October 5.5 6.5 October 2.7 3.8 October 4.0 5.0 October 5.1 6.0
November 7.1 7.8 November 4.3 5.0 November 5.6 6.2 November 6.2 6.9
December 8.1 8.6 December 4.8 5.4 December 6.3 6.8 December 6.6 7.0
January 6.6 8.0 January 4.8 4.9 January 5.6 6.3 January 6.1 6.7
February 7.2 8.4 February 4.9 4.9 February 6.0 6.5 February 6.4 7.0
March 7.5 8.3 March 4.1 4.5 March 5.7 6.2 March 6.3 6.8
Annual Average 5.9 6.5 6.8 Annual Average 3.3 3.6 3.8 Annual Average 4.5 4.9 5.1 Annual Average 5.4 5.9 6.0
Average Apr-Jun 5.1 5.6 6.6 Average Apr-Jun 2.7 2.9 3.4 Average Apr-Jun 3.8 4.2 4.8 Average Apr-Jun 5.0 5.2 5.6
3203 3999 7202 15640
Teachers Resource Total
No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025
Appendix 3
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Education Resources
Council WideAPT&C
14

Page 15

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 2.8 3.0 April 0.0 0.0 0.0 April 3.6 2.8 3.0 April 5.1 5.2 5.7
May 3.9 3.2 2.7 May 0.0 0.0 0.0 May 3.9 3.2 2.7 May 5.1 5.3 5.6
June 4.2 3.2 2.9 June 0.0 0.0 0.0 June 4.2 3.2 2.9 June 4.7 5.2 5.4
July 3.5 3.5 July 0.0 0.0 July 3.5 3.5 July 3.8 4.1
August 3.8 2.6 August 0.0 0.0 August 3.8 2.6 August 4.1 4.7
September 3.9 3.2 September 0.0 0.0 September 3.9 3.2 September 5.3 6.1
October 3.2 3.2 October 0.0 0.0 October 3.2 3.2 October 5.1 6.0
November 3.5 4.6 November 0.0 0.0 November 3.5 4.6 November 6.2 6.9
December 3.3 4.4 December 0.0 0.0 December 3.3 4.4 December 6.6 7.0
January 2.8 3.7 January 0.0 0.0 January 2.8 3.7 January 6.1 6.7
February 3.5 3.5 February 0.0 0.0 February 3.5 3.5 February 6.4 7.0
March 2.6 3.7 March 0.0 0.0 March 2.6 3.7 March 6.3 6.8
Annual Average 3.5 3.5 3.4 Annual Average 0.0 0.0 0.0 Annual Average 3.5 3.5 3.4 Annual Average 5.4 5.9 6.0
Average Apr-Jun 3.9 3.1 2.9 Average Apr-Jun 0.0 0.0 0.0 Average Apr-Jun 3.9 3.1 2.9 Average Apr-Jun 5.0 5.2 5.6
817 0 817 15640
Resource Total
No of Employees at 30 June 2025
Appendix 4
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Finance and Corporate Resources
No of Employees at 30 June 2025 No of Employees at 30 June 2025
APT&C Council WideManual Workers
No of Employees at 30 June 2025
15

Page 16

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.7 5.3 5.6 April 6.9 7.2 4.8 April 6.2 6.1 5.3 April 5.1 5.2 5.7
May 4.9 5.2 4.5 May 6.1 8.1 5.7 May 5.4 6.4 5.0 May 5.1 5.3 5.6
June 5.4 5.7 5.1 June 6.8 8.4 6.0 June 6.0 6.8 5.5 June 4.7 5.2 5.4
July 5.0 5.3 July 8.1 8.6 July 6.2 6.7 July 3.8 4.1
August 5.1 5.5 August 8.5 8.8 August 6.4 6.9 August 4.1 4.7
September 4.7 7.5 September 7.8 7.4 September 6.0 7.5 September 5.3 6.1
October 4.9 7.3 October 5.2 6.0 October 5.0 6.8 October 5.1 6.0
November 4.8 6.8 November 6.7 6.2 November 5.6 6.5 November 6.2 6.9
December 5.1 6.4 December 7.4 5.8 December 6.0 6.2 December 6.6 7.0
January 4.4 7.0 January 6.0 6.2 January 5.0 6.7 January 6.1 6.7
February 5.2 7.0 February 6.3 7.1 February 5.6 7.0 February 6.4 7.0
March 5.3 6.8 March 7.2 5.9 March 6.1 6.4 March 6.3 6.8
Annual Average 5.0 6.3 6.2 Annual Average 6.9 7.1 6.5 Annual Average 5.8 6.7 6.4 Annual Average 5.4 5.9 6.0
Average Apr-Jun 5.3 5.4 5.1 Average Apr-Jun 6.6 7.9 5.5 Average Apr-Jun 5.9 6.4 5.3 Average Apr-Jun 5.0 5.2 5.6
856 538 1394 15640
Manual Workers Council Wide
No of Employees at 30 June 2025No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
APT&C
16

Page 17

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 6.5 6.5 7.0 April 9.4 8.8 9.4 April 7.4 7.3 7.8 April 5.1 5.2 5.7
May 5.8 5.8 6.6 May 8.4 9.5 8.6 May 6.6 7.0 7.2 May 5.1 5.3 5.6
June 5.5 6.0 6.6 June 8.6 9.2 8.7 June 6.5 7.0 7.3 June 4.7 5.2 5.4
July 5.4 6.5 July 8.8 11.2 July 6.5 8.0 July 3.8 4.1
August 4.8 6.9 August 8.6 11.4 August 6.0 8.4 August 4.1 4.7
September 5.6 7.2 September 9.3 12.0 September 6.8 8.8 September 5.3 6.1
October 6.5 7.5 October 8.5 11.0 October 7.1 8.6 October 5.1 6.0
November 7.3 8.1 November 9.0 10.0 November 7.8 8.7 November 6.2 6.9
December 7.4 7.0 December 9.5 11.6 December 8.1 8.5 December 6.6 7.0
January 7.0 6.7 January 10.3 11.3 January 8.1 8.2 January 6.1 6.7
February 7.0 7.0 February 9.9 11.6 February 7.9 8.5 February 6.4 7.0
March 7.1 7.5 March 9.4 10.7 March 7.9 8.6 March 6.3 6.8
Annual Average 6.3 6.9 7.1 Annual Average 9.1 10.7 10.6 Annual Average 7.2 8.1 8.2 Annual Average 5.4 5.9 6.0
Average Apr-Jun 5.9 6.1 6.7 Average Apr-Jun 8.8 9.2 8.9 Average Apr-Jun 6.8 7.1 7.4 Average Apr-Jun 5.0 5.2 5.6
1780 1016 2796 15640
Resource TotalManual Workers
No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025
Appendix 6
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Social Work Resources
APT&C Council Wide
17

Page 18

Appendix 7
Absence by long and short term
From: 1 April to 30 June 2025
Community and Enterprise 3431 1.7 4.9 6.6 2.1 4.5 6.6 1.9 4.9 6.8
Education 7202 0.8 4.1 4.9 1.6 3.4 5.0 1.3 3.1 4.4
Finance and Corporate 817 1.1 1.9 3.0 1.0 1.7 2.7 1.0 1.9 2.9
Housing & Technical 1394 1.3 4.0 5.3 2.1 2.9 5.0 1.9 3.6 5.5
Social Work 2796 2.4 5.4 7.8 2.1 5.1 7.2 2.2 5.1 7.3
Council Overall for April to June
2025 15640 1.3 4.4 5.7 1.8 3.8 5.6 1.6 3.8 5.4
Resource No of
employees
Resource
Total
Absence %
April 2025
Total Short
Term %
Total Long
Term %
May 2025
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
June 2025
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
18

Page 19

From : 1 June 2025 - 30 June 2025
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1401 30 952 16 58 14 392 28 616 18 3419 22
Psychological 1243 27 2184 38 207 49 505 36 1251 37 5390 35
Stomach, Bowel, Blood, Metabolic Disorders 479 10 867 15 59 14 215 15 331 10 1951 12
Respiratory 357 8 476 8 37 9 81 6 373 11 1324 8
Other Classification 1142 25 1324 23 64 15 206 15 776 23 3512 23
Total Days Lost By Resource 4622 100 5803 100 425 100 1399 100 3347 100 15596 100
Total Work Days Available
From : 1 June 2024 - 30 June 2024
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1336 33 904 16 48 10 348 19 772 21 3408 21
Psychological 1038 25 1926 34 192 40 737 40 1338 36 5231 33
Stomach, Bowel, Blood, Metabolic Disorders 480 12 628 11 41 9 224 12 439 12 1812 11
Respiratory 348 8 857 15 74 16 172 9 351 9 1802 11
Ear / Nose / Throat / Mouth / Eye 146 4 302 5 5 1 58 3 179 5 690 4
Gynaelogical / Urological 153 4 280 5 55 12 69 4 187 5 744 5
Cardiovascular 184 4 120 2 0 0 108 6 124 3 536 3
Cancer 167 4 264 5 0 0 40 2 112 3 583 4
Neurological, Endocrine 205 5 269 5 24 5 64 3 169 4 731 5
Skin 24 1 45 1 30 6 14 1 36 1 149 1
Infectious Diseases 23 1 112 2 7 1 11 1 57 2 210 1
Other Classification 902 22 1392 24 121 25 364 20 864 23 3643 23
Total Days Lost By Resource 4104 100 5707 100 476 100 1845 100 3764 100 15896 100
Total Work Days Available
*WDL = Work Days Lost
Finance and
Corporate
25615 45896
Appendix 8
Attendance Monitoring
Absence Classification
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total WDL
By Reason Percentage
Housing and
Technical
Resources
Education
Resources
PercentageTotal WDL
By ReasonREASONS
Community and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Housing and
Technical
Resources
68051 132974 14681
Social Work
Resources
53548270981495814076768500
19

Page 20

Appendix 9
Teachers Others
133 47 74 27 81 158
102 57 101 13 64 133
Apr-Jun 2024 Apr-Jun 2025 Apr-Jun 2024 Apr-Jun 2025
130 117 Community and Enterprise 1 5
109 63 1 10
100 91 0 0
25 24 0 0
63 51 0 4
125 120 2 34
552 466 4 53
Reason Apr-Jun 2024 Apr-Jun 2025 Apr-Jun 2024 Apr-Jun 2025
Work Stress 12 19 91 98
Addicition 0 1 173 161
Personal 141 17 29 16
Anxiety/Depression 0 72 34 46
Bereavement 13 12 119 102
Total 166 121 446 423
Community and Enterprise
Resource
No of Employees Referred To Employee Support Officer
No of Employees Referred For Cognitive Behavioural Therapy
Resource
Finance and Corporate
Education
Housing and Technical
Occupational Health Reports
From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
Total (Apr-Jun 2025) 520
Total (Apr-Jun 2024) 470
No of Employees Referred For Physiotherapy
Resource
Community and Enterprise
Education (Teachers)
Education (Others)
Finance and Corporate
Housing and Technical
Social Workk
Total
Analysis of Counselling Referrals by Cause
Not Disclosed
Education
Finance and Corporate
Housing and Technical
Social Work
Social Work
Total
Total
20

Page 21

2024 2025 2024 2025 2024 2025 2024 2025 2024 2025 2024 2025
Specified Injury 0 0 0 0 0 0 0 0 0 0 0 0
Specified Injury (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Specified Injury* 0 0 0 0 0 0 0 0 0 0 0 0
Over 7 Day 8 1 2 0 0 0 1 1 1 0 12 2
Over 7 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 7 Day** 8 1 2 0 0 0 1 1 1 0 12 2
Over 3 Day 1 0 3 0 0 0 0 0 1 0 5 0
Over 3 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3 Day** 1 0 3 0 0 0 0 0 1 0 5 0
Minor Injury 38 15 57 33 0 1 6 4 23 20 124 73
Near Miss 0 5 6 17 0 0 0 1 4 4 10 27
Violence (Physical) 6 14 346 221 0 0 0 0 12 5 364 240
Violence (Verbal) 5 3 42 34 0 0 2 4 12 5 61 46
Total Minor*** 49 37 451 305 0 1 8 9 51 34 559 386
Total Finalised 58 38 456 305 0 1 9 10 53 34 576 388
Accident 1 3 9 4 0 0 0 0 0 0 10 7
Incident 0 0 4 3 0 0 0 0 1 0 5 3
Violence (Physical) 0 0 12 9 0 0 0 0 0 0 12 9
Violence (Verbal) 0 0 4 0 0 0 0 3 0 0 4 3
Near Miss 0 0 0 0 0 0 0 0 0 0 0 0
Total to be investigated**** 1 3 29 16 0 0 0 3 1 0 31 22
Total Events/Month 59 41 485 321 0 1 9 13 54 34 607 410
**Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury)
***A minor injury is an injury not covered by  Over 7 day, Over 3 day or Specified
****In process relates to records not yet investigated/defined by managers
*Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or
penetrating injury as defined by the HSE
Appendix 10
Analysis of Accidents / Incidents
From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024
Accidents by Month of Occurrence
Community and Enterprise Education Finance and Corporate Housing & Tech Social Work TOTAL
21

Page 22

APT&C Manual /
Craft Teachers Total APT&C Manual /
Craft Teachers Total
Community and Enterprise 1 32 N/A 33 0 0 N/A 0 1 32 N/A 33 11 14 8 52% 33.52
Education 4 N/A 4 8 0 0 0 0 4 0 4 8 1 2 5 6% 8
Finance and Corporate 1 0 N/A 1 0 0 N/A 0 1 0 N/A 1 1 0 0 2% 1
Housing and Technical 5 5 N/A 10 0 2 N/A 2 5 3 N/A 8 3 4 3 15% 10
Social Work 1 13 N/A 14 0 0 N/A 0 1 13 N/A 14 7 5 2 25% 14
Total  (Apr-Jun 2025) 12 50 4 66 0 2 0 2 12 48 4 64 23 25 18 73% 66
Total  (Apr-Jun 2024) 7 29 3 39 3 5 0 8 5 23 3 31 24 10 5 87%
APT&C Manual/
Craft Teachers Total APT&C Manual/
Craft Teachers Total APT&C Manual/
Craft Teachers Total
Community and Enterprise 0 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0
Education 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 0
Finance and Corporate 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0
Housing and Technical 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0
Social Work 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0
Total  (Apr-Jun 2025) 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0
Total  (Apr-Jun 2024) 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 April - 30 June 2025
Appeal's Panel
Total
Appendix 11
Record of Disciplinary Hearings
From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024
Resource
No of Disciplinary Hearings Outcome of Disciplinary Hearings No of weeks to convene Disciplinary
Hearing
% Held within
6 Weeks
APT&C Manual/
Craft 6+Teachers Total
No Action Action Taken
3
Appeals
PendingAPT&C Manual/
Craft Teachers Total
Upheld
4-6
Upheld in Part Not Upheld
Upheld Upheld in Part Not Upheld Total Withdrawn Appeals pending to
date
Resource
No of Appeals Outcome of Appeals
10 0 0 0
22

Page 23

Appendix 12
Record of Grievances
From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024
Grievances No of Grievances No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Total (Apr-Jun 2025) 10 0 0 0 10
Total (Apr-Jun 2024) 0 0 0 0 0
Dignity at Work
From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Total (Apr-Jun 2025) 5 0 0 0 0 5
Total (Apr-Jun 2024) 0 0 0 0 0 0
23

Page 24

Appendix 13
From 1 April - 30 June 2025
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 3 11 1 4 10 29 26%
Child Caring / Caring
Responsibilities 4 3 0 0 1 8 7%
Disatisfaction with terms and
conditions 1 1 0 1 0 3 3%
Further Education 2 1 0 0 2 5 4%
Moving outwith area 2 0 1 0 2 5 4%
Personal Reasons 9 14 2 5 7 37 33%
Poor relationship with managers /
colleagues 4 2 0 0 1 7 6%
Other 8 5 3 0 3 19 17%
Total no. of leavers per Resource
eligible for an exit interview 33 37 7 10 26 113 100%
Number of exit interviews
conducted 6 10 2 2 4 24
% of leavers interviewed 18% 27% 29% 20% 15% 21%
From 1 April - 30 June 2024
Total no. of leavers per Resource
eligible for an exit interview 39 54 6 11 30 140
Number of exit interviews
conducted 6 23 3 4 7 43
% of leavers interviewed 15% 43% 50% 36% 23% 31%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
24

Page 25

Appendix 14
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
5197 2509 292 48% 6% 12%
1951 1067 90 55% 5% 8%
3239 1371 199 42% 6% 15%
392 222 20 57% 5% 9%
4222 1982 226 47% 5% 11%
718 409 59 57% 8% 14%
660 204 17 31% 3% 8%
844 287 27 34% 3% 9%
4146 2116 257 51% 6% 12%
71 12 3 17% 4% 25%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
2854 899 281 31% 10% 31%
1043 333 102 32% 10% 31%
1797 560 177 31% 10% 32%
115 47 5 41% 4% 11%
2142 595 183 28% 9% 31%
674 285 93 42% 14% 33%
2312 809 266 35% 12% 33%
369 65 12 18% 3% 18%
12 5 0 42% 0% 0%
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 April - 30 June 2025
Total Number of applications received: 7262
Total Number of Equal Opportunities Monitoring forms received: 7236
Total Number of posts advertised: 269
Total Number of appointments: 425
Gender / Disability / Age
** includes White Scottish and White Other British
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of BME applicants
Total No of Minority Ethnic applicants*
Total No of White applicants**
Total No of Veteran applicants
*includes Mixed, Asian, Black, White (Irish, Polish, Gypsy/Traveller, Roma, Showman/Showwoman, other
Total No of Female Applicants
From : 1 April - 30 June 2024
Total Number of applications received: 6128
Total Number of Equal Opportunities Monitoring forms received: 3523
Total Number of posts advertised: 2862
Total Number of appointments: 581
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
25

Page 26

Appendix 15
Resource Total F/T P/T F/T P/T Total Chief
Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3387 1246 351 238 1552 2446.47 5.00 1697.99 413.49 264.45 45.94 17.60 0.00 2.00 0.00
Education - Others 3164 95 88 554 2427 2433.87 6.00 1181.26 1054.95 130.70 49.00 11.00 0.00 0.96 0.00
Education - Teachers 4122 700 117 2127 1178 3527.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3527.90
Finance & Corporate Resources 809 182 22 368 237 720.60 8.00 88.75 335.41 210.07 55.37 23.00 0.00 0.00 0.00
Housing & Technical 1367 751 113 344 159 1260.51 4.00 195.51 668.67 350.04 33.29 7.00 0.00 2.00 0.00
Social Work Resources 2739 191 230 923 1395 2347.99 3.00 319.33 1436.10 465.66 91.30 31.60 0.00 1.00 0.00
9209.44 (excluding Teachers)
Total All Staff 15588 3165 921 4554 6948 12737.34 26.00 3482.84 3908.62 1420.92 274.90 90.20 0.00 5.96 3527.90
Resource Total F/T P/T F/T P/T Total Chief
Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3351 1198 365 239 1549 2404.42 5.00 1650.91 410.60 269.67 47.94 18.30 0.00 2.00 0.00
Education - Others 3169 97 94 551 2427 2438.90 5.00 1172.94 1063.60 136.40 48.00 11.00 0.00 1.96 0.00
Education - Teachers 4154 705 127 2140 1182 3544.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3544.20
Finance & Corporate Resources 813 184 22 360 247 721.38 8.00 89.59 338.44 207.13 56.22 22.00 0.00 0.00 0.00
Housing & Technical 1373 760 115 337 161 1266.27 3.00 188.00 676.43 354.95 32.89 9.00 0.00 2.00 0.00
Social Work Resources 2759 189 232 927 1411 2364.87 3.00 320.84 1449.61 472.02 84.80 33.60 0.00 1.00 0.00
9195.84 (excluding Teachers)
Total All Staff 15619 3133 955 4554 6977 12740.04 24.00 3422.28 3938.68 1440.17 269.85 93.90 0.00 6.96 3544.20
Quarterly Joint Staffing Watch Return : Number Employed On 14 June 2025
Analysis by Resource
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
Quarterly Joint Staffing Watch Return : Number Employed On 8 March 2025
Analysis by Resource
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
26

Page 27

Report
Agenda Item 
Report to: Employee, Equalities, Diversity and Inclusion Forum
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – 1 April to 30 June 2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide employment information for 1 April to 30 June 2025 relating to  
Community and Enterprise Resources 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that following employment information for the period 1 April to 30 June 2025
relating to Community and Enterprise Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as of 14 June 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Employee, Equalities, Diversity and Inclusion
Forum.  This report for Community and Enterprise Resources provides information
on the position for 1 April to 30 June 2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of June 2025 for
Community and Enterprise Resources. 
The Resource absence figure for June 2025 was 6.8%, this figure has increased by
0.2% when compared to the previous month and is 1.4% higher than the Council-
wide figure.  Compared to June 2024, the Resource absence figure has increased by
0.8%.
4
27

Page 28

Based on the absence figures for June 2025 and annual trends, the annual average
absence for the Resource for 2025/2026 is 6.8%, compared to a Council-wide
annual average figure of 6%. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 353 referrals were made during the period.  This represents
an increase of 29 when compared with the same period last year. 
4.3. Accident/Incident Statistics 
There were 38 accidents/incidents recorded within the Resource this period; this
figure has decreased by 20 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 33 disciplinary hearings were held within the Resource.  This
figure has increased by 9 when compared to the same period last year.  One appeal
has been submitted and is scheduled to be heard by the Appeals panel.  Three
grievance complaints were submitted, which is an increase of 3 when compared to
the same period last year.  Three Dignity at Work complaints were also raised, which
also represents an increase of 3 when compared to the same period last year.   
4.5. Analysis of Leavers (Appendix 2a) 
There were 33 leavers within the Resource this period eligible for an exit interview, a
decrease of 6 when compared with the same period last year.  6 exit interviews were
conducted during the period, and this figure remains unchanged when compared
with the same period last year.   
5. Staffing Watch (Appendix 3)
5.1. Appendix 3 provides the Staffing Watch and shows there has been an increase of 36
in the number of employees in post from 8 March 2025 to 14 June 2025. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report.
28

Page 29

10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
28 July 2025 
Link(s) to Council Values/Priorities/Outcomes
  Accountable, effective, efficient and transparent
  Fair, open and sustainable
  Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
None 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.maxwell@southlanarkshire.gov.uk 
29

Page 30

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7
May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6
June 4.3 4.1 3.6 June 5.9 6.4 7.4 June 5.7 6.0 6.8 June 4.7 5.2 5.4
July 2.3 3.8 July 4.6 4.5 July 4.3 4.4 July 3.8 4.1
August 3.0 3.4 August 5.2 6.2 August 4.9 5.7 August 4.1 4.7
September 2.5 3.8 September 7.1 7.5 September 6.4 6.9 September 5.3 6.1
October 2.0 4.2 October 7.0 7.2 October 6.3 6.7 October 5.1 6.0
November 2.6 3.6 November 8.1 8.3 November 7.3 7.6 November 6.2 6.9
December 3.0 3.8 December 7.5 8.1 December 6.8 7.4 December 6.6 7.0
January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7
February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0
March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8
Annual Average 3.2 3.7 3.6 Annual Average 6.8 7.2 7.4 Annual Average 6.2 6.6 6.8 Annual Average 5.4 5.9 6.0
Average Apr-Jun 3.9 3.5 3.2 Average Apr-Jun 6.2 6.5 7.3 Average Apr-Jun 5.9 6.1 6.7 Average Apr-Jun 5.0 5.2 5.6
578 2853 3431 15640
Resource Total
No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Community and Enterprise Resources
APT&C Council WideManual Workers
30

Page 31

Apr - Jun Apr - Jun
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 91 98
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 1 5
TOTAL 324 353
Apr - Jun Apr - Jun
2024 2025
Specified Injuries* 0 0
Over 7 day absences 8 1
Over 3 day absences** 1 0
Minor 38 15
Near Miss*** 0 5
Violent Incident:  Physical**** 6 14
Violent Incident:  Verbal***** 5 3
Total Accidents/Incidents 58 38
Apr - Jun Apr - Jun
2024 2025
Total Number of Hearings 24 33
Total Number of Appeals 5 1
Appeals Pending 0 1
Time Taken to Convene Hearing October - Apr to Jun 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
11 14 8
Apr - Jun Apr - Jun
2024 2025
Number of Grievances 0 3
Number Resolved at Stage 1 0 0
Number Resolved at Stage 2 0 0
Number Resolved at Stage 3 0 0
Still in Progress 0 3
Apr - Jun Apr - Jun
2024 2025
Number of Incidents 0 3
Number Resolved at Informal Stage 0 0
Number Resolved at Formal Stage 0 0
Number of Appeals 0 0
Appeals in Process 0 0
Still in Process 0 3
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
COMMUNITY AND ENTERPRISE RESOURCES
102 133
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
0 0
130 117
CAUSE OF ACCIDENTS/INCIDENTS
31

Page 32

Apr - Jun Apr - Jun
2024 2025
Career Advancement 4 3
Child Caring / Caring Responsibilities 1 4
Disatisfaction with terms and conditions 0 1
Further Education 0 2
Moving outwith area 0 2
Personal Reasons 0 9
Poor relationship with managers / colleagues 0 4
Travelling difficulties 0 0
Other 34 8
Total Number of Leavers Eligible for Exit Interview 39 33
Number of Exit Interviews conducted 6 6
Percentage of interviews conducted 15% 18%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
COMMUNITY AND ENTERPRISE RESOURCES
32

Page 33

Appendix 3
COMMUNITY AND ENTERPRISE RESOURCES
F/T P/T F/T P/T
1246 351 238 1552 3387
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed
SCP Teacher Total
5.00 1697.99 413.49 264.45 45.94 17.60 0.00 2.00 0.00 2446.47
F/T P/T F/T P/T
1198 365 239 1549 3351
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed
SCP Teacher Total
5.00 1650.91 410.60 269.67 47.94 18.30 0.00 2.00 0.00 2404.42
As at 08 March 2025
Total Number of Employees
Male Female Total
*Full-Time Equivalent No of Employees                                                                                                                                                    
Salary Bands                                                                                                                                       
Joint Staffing Watch Return
As at 14 June 2025
Total Number of Employees
Male Female Total
*Full-Time Equivalent No of Employees                                                                                                                                                    
Salary Bands                                                                                                                                       
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Employee, Equalities, Diversity and Inclusion Forum
Date of Meeting: 27 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Annual Report on Mainstreaming Equalities and
Diversity 2024/2025 – Community and Enterprise
Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
]
 update the Forum on the strategic and operational work being undertaken by
Community and Enterprise Resources to meet the commitments within the
Mainstreaming equalities progress report 2021 to 2023 and South Lanarkshire
Working for You Mainstreaming equalities report 2021 to 2025 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the work being undertaken by Community and Enterprise Resources in
terms of mainstreaming equalities be noted. 
3. Background
3.1. In April 2021, the Council published its Mainstreaming equalities report 2021 to
2025.  Within this document, there are 5 Equality Outcomes set for 2021 to 2025 with
a focus on actions to produce results intended to achieve specific and identifiable
improvements in people’s life chances. The five outcomes are:- 
 Equality Outcome 1: Increase the number of people from minority ethnic
backgrounds employed in the South Lanarkshire Council workforce to reflect the
diversity of the South Lanarkshire population
 Equality Outcome 2: Older people, those from vulnerable groups and individuals
who live alone are protected from scams and nuisance calls and their wellbeing
is improved through increased awareness and preventative action 
 Equality Outcome 3: ‘Counselling through schools’ service is accessible for all
children/young people aged 10 and over
 Equality Outcome 4: Prevent homelessness from occurring and significantly
reduce homelessness
 Equality Outcome 5: Increase the number of affordable homes for rent.
5
35

Page 36

3.2. Community and Enterprise Resources is made up of a diverse range of services,
with several services being delivered in line with statutory or regulatory legislation.
Although diverse, there is a clear purpose that all services are working towards, and
that is set out in the Council Plan 2022-2027. Resource equality activity is aligned
and reported against the following six Council plan ‘Connect’ objectives:-   
 caring, connected, sustainable communities
 inspiring learners, transforming learning, strengthening partnerships
 people live the healthiest lives possible
 our children and young people thrive
 good quality, suitable and sustainable places to live
 thriving business, fair jobs and vibrant town centre 
4.  Progress Meeting the Council’s Equality Outcomes
4.1. Community and Enterprise Resources lead on Equality Outcome 2. This outcome is
being progressed by Environmental Services’ Consumer and Trading Standards
Services, and quarterly updates are provided to the Corporate Equality and Diversity
Lead Officer. 
4.1.1. Equality Outcome 2: Older people, those from vulnerable groups and
individuals who live alone are protected from scams and nuisance calls and
their wellbeing is improved through increased awareness and preventative
action 
Elderly and vulnerable adults are often the victims of scams, cold calling, and bogus
workmen. To prevent these individuals from being victims, Trading Standards
Officers have continued to work with Police Scotland and South Lanarkshire
Council’s Social Work and Housing Services to provide talks and educational
literature within sheltered housing complexes.  Posts are also regularly made on
Facebook and Twitter, raising awareness of the latest scams and signposting
consumer educational resources. 
Over the last year:-
 9 presentations were delivered by Trading Standards to Police Scotland,
Seniors Together and Sheltered Housing. These talks help prevent elderly and
vulnerable adults from becoming the victims of scams by raising awareness of
the areas where scammers target
 ‘No Cold Calling’ stickers were distributed to vulnerable consumer groups, and
‘Buy with Confidence’ literature was distributed to local businesses
 2 video doorbells have been fitted in 2024
 call blocking - 81 true Call units have been installed since 2013 to protect
vulnerable residents from nuisance and scam phone calls, of which 37 have
been active within the last year. In total, since 2013, 36,729 nuisance calls were
received, of which 36,315 were blocked (over 95%). Over the operational life of
these units, they will have blocked 67,754 nuisance calls (of which 18,708 will
have been scam phone calls), prevented 110 scams, saved vulnerable
households £325,826 and led to a reduction of £302,648 in public service costs
(NHS, social care and police). There will be wellbeing benefits of £156,573
across all users, and for those who would have been scam victims, there are
quality of life benefits of £185,209. This gives total project benefits of £970,256
of which £628,474 are direct financial benefits
36

Page 37

Consumer and Trading Standards have carried out a number of inspections on local
businesses, ensuring compliance with consumer protection, consumer safety,
weights and measures, fair trading and animal health. The impact of these
inspections lifts consumer confidence and ensures a level playing field for
businesses in South Lanarkshire.  To this end, our officers carried out the following
inspections of businesses:- 
 weights and measures related inspections - 169 visits and found 119
contraventions
 consumer safety-related inspections – 128 visits and found 49 contraventions
 fair trading related inspections – 200 visits and found 155 contraventions
 53 visits have been made to ascertain compliance with the sale of products
which are age restricted, mainly vapes, and 15 premises were issued with fixed
penalty notices 
5. Mainstreaming Equalities and Key Areas of Progress 2024/2025 
5.1. Equalities are embedded in each area of service delivery within the Resource.  The
in-house Employee, Equalities, Diversity and Inclusion Group includes officers from
each Service, and it is the responsibility of these service representatives to promote
and co-ordinate employee, equalities, diversity and inclusion activities within their
Services. The Chair of the Resource group attends the corporate Employee,
Equalities, Diversity and Inclusion Working Group, and this ensures the flow of
information between Services and the corporate team and vice versa. 
5.2. The Resource monitors all complaints regarding discrimination and ensures
measures are taken to resolve any issues.  These are reported through the Council’s
complaints procedure and any equality issues are reported to the Resource
Management team as part of the quarterly monitoring process.  There have been no
complaints since the last Annual Report on Mainstreaming Equalities and Diversity
was reported to the Forum in May 2024. 
5.3. Progress on Key Equalities Areas that have been Discussed Over the Last
Year at Employee, Equalities, Diversity and Inclusion Working Group Meetings. 
These are noted below, with more detail on these and other equalities activities
highlighted in Appendix 1 under Council Plan 2022-2027 objectives (as noted in 3.2).
Please note that this is not an exhaustive list of equalities activities embedded in our
Services. 
5.3.1. Caring, connected, sustainable communities
 protection for elderly and vulnerable adults against scams and bogus callers
(included at 4.1.1) 
 Community and Enterprise Resources’ Sustainability Team is working with a
Climate Justice PhD student from Glasgow Caledonian University. The student
is undertaking a study to understand who is vulnerable to climate change in
South Lanarkshire and what actions should be taken to ensure that the
transition to net-zero carbon emissions is fair to everyone. 
Climate change affects everyone differently. Vulnerable people are
characterised as being most exposed to the negative impacts of climate
change, like heat and flooding. Additionally, factors such as (but not limited to)
income, race, gender, and age may increase one’s vulnerability.
37

Page 38

The study aims to identify the most vulnerable people in South Lanarkshire so
they can have a say in how the transition to net zero unfolds. Gathering
perspectives of South Lanarkshire residents will help inform South Lanarkshire
Council on how to best support their communities. This research will ultimately
contribute to policymaking intended to improve the lives of South Lanarkshire’s
residents by reducing both their vulnerability to climate change and contribution
to global carbon emissions. Through this research South Lanarkshire can work
towards a fairer, greener future for everyone in the region. 
 the Scottish Government financed Community Led Local Development (CLLD)
gives local communities the power to tackle their own, local challenges by
building knowledge and skills, supporting new ideas and encouraging
cooperation. CLLD helps to create viable and resilient communities. 
CLLD aims to address social, environmental, and economic issues and includes
actions affecting rural and island communities to:- 
 drive community action on climate change
 enhance rural services and facilities, including transport initiatives
 enhance natural/cultural heritage, tourism and leisure
 support food and drink initiatives (for example short supply chains,
community food)
 build co-operation with similar groups in Scotland, UK, and Europe
 empowering communities to exchange learning and knowledge with each
other, realise their potential and build opportunities for all 
In South Lanarkshire Council, Community and Enterprise Resources’ External
Funding Team manage the CLLD funds to support the delivery of CLLD
programmes, addressing issues such as young people support groups through
peer support (Outreach Community Church) and Energy efficiency upgrades to
homes through an innovative community approach (Climate Action Strathaven).
In 2024/2025 CLLD provided £473,109 funding to 44 projects in rural
Lanarkshire in 22 different locations. Examples of how this funding was used is
included in Appendix 1. 
5.3.2. Our children and young people thrive
 Community and Enterprise Resources’ Facilities Services provides a school
meals service for children and young people in South Lanarkshire. All meals
meet the Nutritional Requirements for Food and Drink in Schools (Scotland)
Regulations 2020.  The service provides a range of nutritionally balanced menu
options every day, including meals which are suitable for vegetarians and
vegans. There is an Adapted Diet Procedure in place for any child or young
person who has any dietary need, food allergy or intolerance, a registration
form is completed, and menu agreed. In addition to this, Facilities Services offer
cultural menu provision, such as Vegan and Halal menu options and all
requests are handled within this process. The number of adapted diets
continues to grow, and the register now holds 882 adapted diets for medical
reasons and 775 diets for pupils with cultural beliefs. Through provision of these
nutritious school meals, the Facilities Service is assisting in improving the
health and wellbeing of children and young people in South Lanarkshire.  
38

Page 39

 Community and Enterprise Resources’ Environmental Services have an
ongoing programme of work designed to prevent the sale of tobacco and
Nicotine Vapour Products (NVPs) to children (under 18s) which assists in the
prevention of children taking up smoking. This includes carrying out inspections
to businesses which sell such products (as noted at 4.1.1, 53 visits have been
made to ascertain compliance with the sale of products which are age
restricted, mainly vapes, and 15 premises were issued with fixed penalty
notices). 
5.3.3. Good quality, suitable and sustainable places to live
 South Lanarkshire Local Development Plan (SLLDP) is a statutory plan which
guides the future use of land within the Council’s area. Community and
Enterprise Resources’ Planning service has started work on the preparation of
the third version, SLLDP3, however there is a long development process before
this will be adopted by the Council, anticipated to be towards the end of 2027.
The first stage involves the preparation of an Evidence Report which will inform
the spatial strategy for South Lanarkshire. The Evidence Report involves firstly
the gathering of extensive data and information covering 33 policy themes,
including: the location of new housing and employment; addressing the
principles of local living (the creation of 20-minute neighbourhoods) so that
everyone has access to local services and facilities; health and wellbeing;
sustainable transport and active travel; and tackling the climate and nature
emergencies.   
During the year, the Planning service has undertaken extensive engagement
with other Council services, partners and stakeholders to help gather data and
information and understand the spatial implications of their own proposals and
strategies. At the same time, wider engagement has been carried out with local
communities, and interest groups to understand their needs and aspirations. A
Place survey that was published during 2024 resulted in over 950 responses.
This reflects the key role that the planning system has in improving our local
communities, tackling disadvantage, and promoting equality. 
The Planning service is a partner in the Marmot Place project. The Marmot
approach recognises that health and inequalities are mostly shaped by the
conditions in which people are born, grow, live, work and age, and takes action
to improve health and reduce health inequalities.  The eight principles of a
Marmot Place will be embedded in SLLDP3 and be a driver in the preparation
of the spatial strategy. 
Community and Enterprise Resources’ External Funding team administer the
UK Shared Prosperity Fund (UKSPF) across the four UKSPF investment
themes below:- 
 community and place 
 local business 
 people and skills 
 multiply (numeracy for adults)  
39

Page 40

The three-year UKSPF programme will invest £12,221,811 across three
financial years, 2022/2023 to 2024/2025. A range of initiatives in South
Lanarkshire have been supported, which help to embed equalities across many
aspects of service provision, including:- 
 town centre improvements which enhance accessibility
 CCTV investment that improves safety
 targeted employment support underpinning the Council’s No One Left
Behind Plan, including a focus on those with protected characteristics 
5.3.4. Thriving business, fair jobs and vibrant town centre
 Community and Enterprise Resource’s Economic Development team has
continued to lead the delivery of investment in town and neighbourhood centres
which has acted as a catalyst for additional investment to maximise
opportunities for growth. 
This has led to the development of the East Kilbride and Hamilton masterplans
and subsequent investment of £50.3M and £8M respectively, alongside support
and investment in other town centres such as Rutherglen, with the development
of a town centre action plan, and Lanark, with streetscape investment. Both
East Kilbride and Hamilton masterplans have been subject to extensive
community consultation, and we will continue to consult on individual elements
of each plan. The East Kilbride masterplan has been through a Community
Health Impact Assessment. 
The Economic Development team continues to play an active part in all town
centres, liaising with local groups to achieve positive outcomes. Projects are
varied but include looking at accessible and dementia friendly initiatives in our
town centres. 
The vision is for inclusive and accessible town centres with increased levels of
living, working and play, regardless of mobility and income. 
Further details on the above and other areas of work progressed by the
Resource in relation to mainstreaming equalities during 2024/2025 can be
found in Appendix 1. 
6. Integrated Impact Assessments (IIAs)
6.1. The Council meets its statutory duties by ensuring that equality and diversity issues
are effectively mainstreamed and built into strategic planning and performance
monitoring, and the Council’s Equality and Diversity Strategy indicates this can be
achieved by undertaking IIAs. IIAs have been in place within South Lanarkshire
Council since mid-October 2024 and include the requirements to consider a range of
duties, including:- 
 Equality Act 2010 protected characteristics 
 socio-economic – Ffairer Scotland Duty 
 human rights 
 children and young people’s rights 
 Armed Forces Duty 
 Consumer Duty 
 sustainability 
40

Page 41

Prior to October 2024, there had been a requirement to complete both an Equality
Impact Assessment (EQiA) and Sustainable Impact Assessment separately. 
6.2. During 2024/2025, the Resource completed two EQiAs and eleven IIAs, details are
provided within the links before, which indicate the subject in relation to the list of
savings proposals following: 
 Financial Savings 2024/2025 - Support for Gala Days Plans 
 Financial Savings 2025/2026 - Christmas Events Plans and policies
 Financial Savings 2025/2026 - Weedkilling (CER03), Grounds Grass Cutting
(CER11) Plans and policies
 Financial Savings 2025/2026 Mechanical Sweeping-Small (CER05), Litter
Collection (CER06) Plans and policies
 Financial Savings 2025/2026 - Winter Gritting Plans and policies
 Financial Savings 2025/2026 - Business Support Plans and policies
 Financial Savings 2025/2026 - School Meals Plans and policies
 Financial Savings 2025/2026 - Building Cleaning (Schools) Plans and policies
 Financial Savings 2025/2026 - Income Generation (Bereavement) Plans and
policies
 The Employability Promise Plans and Policies 
 Commissioning Plan for services delivered by SLLC (2025 to 2027) Plans and
Policies
 Implementation of a Booking System at Household Waste Recycling Centres
(EQiA)
 Introduction of Charge for Uplift of Household Garden Waste (Burgundy Bin)
(EQiA) 
The Resource follows corporate guidance for carrying out IIAs.  Training for new
users of the IIA system is arranged corporately.   
7. Training and Employees  
7.1. Training and Development
7.1.1. The Resource will continue to ensure employees understand that equal opportunities
are a core competence against which they are measured. Within the Council’s
induction framework, line managers are required to explain conditions of service and
processes to new employees, which includes consideration of equal opportunities
issues.  The Learn on-Line modules, listed below, were identified as mandatory
training for all employees, and have been added to Service training matrices, and
completion of these courses is being monitored by the Community and Enterprise
Learning and Development Board.   
 Equality and Diversity Awareness
 Marriage and Civil Partnerships
 Unconscious Bias
 Race Discrimination 
7.1.2. During 2024/2025, Community and Enterprise Resources received a total of 2,981
applications for employment. From these applications, 277 posts were filled following
the Council’s policy on recruitment and selection. Of the 543 candidates who
declared a disability, 36 were appointed.  Of the 409 candidates from a black/ethnic
minority background, 16 were appointed. 
41

Page 42

7.2. Supporting Employees
7.2.1. Community and Enterprise Resources continues its commitment to ensuring
employees have the necessary support to allow them to undertake their duties and is
proactive in promoting the health and wellbeing of employees. 
7.2.2. The Resource supports employees who require adjustments to be made in their role. 
This enables them to undertake their full range of duties, preventing potential
absences, and in some cases, helping them to return to work.  These adjustments
range from providing a more supportive chair, upright mouse, adapted keyboard, as
well as considering amendment to their duties. 
7.2.3. The Resource will continue to ensure that employees are made aware of the
Neurodiversity Officer role and the availability of the officers trained in British Sign
Language (BSL). 
8. Access to Information 
8.1. The Resource publishes information about Council services on the Council website,
in compliance with the Web Content Accessibility Guidelines legislation which came
into force on 23 September 2020.  ReciteMe was launched on the Council’s website
in October 2022, providing additional accessibility and language options for users. 
The Resource has a commitment to translate documents and provide interpretation
services when appropriate. 
9. British Sign Language Activities
9.1. The Council has established a South Lanarkshire British Sign Language (BSL) Local
Plan Working Group with the aim of raising awareness of BSL users and to promote
South Lanarkshire as a great place to live and work for the Deaf and Deafblind
community. The group meets quarterly and consists of representatives from all five
Resources, South Lanarkshire Leisure and Culture, Councillor Grant Ferguson,
Lanarkshire Deaf Clubs and Motherwell Deaf Hub.  Community and Enterprise are
represented on the group and officers have also been invited on occasion to speak
specifically on topics of interest. 
10. Consultation, Involvement and Engagement 
10.1. The Resource works closely with a range of equalities groups and stakeholders. 
Over the last year, these have included:- 
 Seniors Together 
 Youth Council 
 various community councils/groups and development trusts, including Burnill
Action Group and Lanark Development Trust
 gypsy/travelling community 
These groups and stakeholders were instrumental in shaping the development of key
strategic pieces of work including the South Lanarkshire Local Development Plan 3
(LDP3).
42

Page 43

11. Next Steps and Priorities    
11.1. During the next year, the Resource will: 
 continue to promote and facilitate equality in all areas of service delivery
 ensure effective input to the Corporate Equality Outcomes 
 continue to implement the process of integrated impact assessments across all
new and revised policy areas
 continue its commitment to staff training and development in relation to
employee, equalities, diversity and inclusion-related issues 
 continue the project management and delivery of projects, which assist in
providing improved facilities for disabled people and ensure compliance with
equality legislation. 
12. Employee Implications
12.1. Mainstreaming equalities are met from within existing employee resources. 
13. Financial Implications
13.1. There are no financial implications arising from this report. 
14. Climate Change, Sustainability and Environmental Implications
14.1. There are no climate change or environmental implications as a result of this report. 
15. Other Implications
15.1. There is a risk to the Council if the Resource does not comply with the relevant
equality legislation. 
16. Integrated Impact Assessment and Consultation Requirements
16.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy and, therefore, there is no requirement for an impact
assessment to be carried out. 
16.2. Other than consultation with the Resource Services on key areas of work related to,
or incorporating, equalities considerations, there was no requirement to undertake
wider consultation in terms of the content of this report. 
David Booth
Executive Director (Community and Enterprise Resources)
23 July 2025 
Links to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
43

Page 44

Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
Community and Enterprise Resources Annual report to Equal Opportunities Forum – 8 May
2024 - Equal Opportunities Forum – 8 May 2024 
List of Background Papers
South Lanarkshire working for you, Mainstreaming equalities progress report 2019–2021
and Mainstreaming equalities report 2021-2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Anne Lewis, Performance and Development Officer
Email: anne.lewis@southlanarkshire.gov.uk 
44

Page 45

Appendix 1 – Employee Equalities Diversity and Inclusion Annual Report 2025 
Caring, connect, sustainable communities 
What we have done so far What difference it has made Service
1 Waste Services provide help to elderly and infirm members of the
community who require assistance presenting their bin for
collection.  This involves removing the bin from the customer’s
garden, emptying, and returning the bin to the storage point. Most
people using this service are 65+. 
Waste Services have special arrangements in place for households
that produce additional non-recyclable waste because one or more
of the residents has a recognised medical condition.
This service is important to those who receive it, as it allows
their bins to be collected by Waste Services and therefore
negates any need or concerns for them to have a relative or
someone else do it for them, or indeed to struggle themselves
to do this, possibly risking injury. This allows them to participate
in all waste services, including recycling, and is therefore
inclusive.   
The medical pull-out service is important as it allows for the safe
disposal of non-hazardous medical waste on a weekly collection
basis. The service facilitates patients with long term medical
conditions to be treated at home; by ensuring the weekly
collection of this waste they will not have to worry about it lying
in a waste bin for too long, or the bin overflowing.
Waste
2 Preparation of an Open Space Strategy (OSS) is a statutory
requirement of the Planning (Scotland) Act 2019.  To date this has
involved firstly an audit of existing open space provision and an
assessment in terms of its quality, quantity and accessibility at a
Council area and locality level. This has been supplemented by
engagement.   
The audit of open space across the Council area this year saw
an assessment of the quantity, quality and accessibility of these
spaces. In addition, wider engagement on the Council’s next
Local Development Plan has included seeking views on open
space provision. All of this work will inform preparation of the
strategy with a draft due to be published for formal consultation
in 2025-26. 
In addition, the findings will be included in the Council’s
evidence report being prepared as part the new Local
Development Plan process. This in turn informs the plan’s
spatial strategy particularly in relation to policy topics on
reducing health inequalities and developing local living
aspirations. 
Planning and
Building
Standards
45

Page 46

Caring, connect, sustainable communities 
What we have done so far What difference it has made Service
3 Elderly and vulnerable adults are often the victims of scams, cold
calling, and bogus workmen. To prevent these individuals being
victims, Trading Standards Officers have continued to work with
Police Scotland and South Lanarkshire Council’s Social Work and
Housing Services to provide talks and educational literature within
sheltered housing complexes.   
Posts are regularly made on Facebook and Twitter, raising
awareness of the latest scams and signposting consumer
educational resources.
Over the last year:
• Nine presentations were delivered by Trading Standards
to Police Scotland, Seniors Together and Sheltered
Housing. These talks help prevent elderly and vulnerable
adults becoming the victims of scams by raising the
awareness of the areas where scammers target. 
• ‘No Cold Calling’ stickers were distributed to vulnerable
consumer groups, and ‘Buy with Confidence’ literature
was distributed to local businesses. 
• Two video doorbells have been fitted during 2024.
• Call blocking - 81 trueCall units have been installed since
2013 to protect vulnerable residents from nuisance and
scam phone calls, of which 37 have been active within
the last year. In total, since 2013, 36,729 nuisance calls
were received, of which 36,315 were blocked (over
95%).  Over the operational life of these units, they will
have blocked 67,754 nuisance calls (of which 18,708 will
have been scam phone calls), prevented 110 scams,
saved vulnerable households £325,826 and led to a
reduction of £302,648 in public service costs (NHS, social
care & police). There will be wellbeing benefits of
£156,573 across all users, and for those who would have
been scam victims there are quality of life benefits of
£185,209. This gives total project benefits of £970,256 of
which £628,474 are direct financial benefits. 
Environmental
Services
46

Page 47

Caring, connect, sustainable communities 
What we have done so far What difference it has made Service
4 Tactile paving, tactile cones, audible tones, dropped kerbs as well
as “on crossing detectors” are provided on all new and upgrades to
traffic signals.   
Footways/footpaths and pedestrian areas are inspected, and safety
defects are noted and repaired by Roads and Transportation
Services. 
Undertake Annual Accident Investigation and Prevention analysis,
identifying seven locations for road safety improvements. 
The Roads and Transportation Service’s programme of
enhancing pedestrian crossing facilities has continued.  During
2024, four pedestrian crossings were upgraded. 
Projects were progressed at the New Hairmyres Rail Station
where the construction of new bus interchange facilities
commenced.  Also, the Lanark Interchange project continued,
with Network Rail agreement discussions ongoing, and the
project developed for future implementation.     
Funding from the Road Safety Improvement Fund has enabled
road safety improvements works to be completed on seven
routes / sites. 
Roads,
Transportation
and Fleet
5 A draft version of the new Local Transport Strategy (LTS) has been
developed and is currently being reviewed and will be presented to
the Committee and Enterprise Committee in June 2024. 
This includes the condition of roads and footways as well as overall
road safety across the network.
New LTS guidance was issued by Transport Scotland and the
draft document has been reviewed in accordance with this.  A
revised draft has been prepared, and it is anticipated that
following consultation in the summer of 2025 the new LTS will
be presented to the Community and Enterprise Committee later
in 2025. 
This addresses transport issues that the community identified
as being important to them in relation to travel within South
Lanarkshire.  The vision is for a sustainable, inclusive, safe, and
accessible transport system helping deliver a healthier, fairer
and more prosperous South Lanarkshire for communities,
businesses and visitors. 
Roads,
Transportation
and Fleet
47

Page 48

Caring, connect, sustainable communities 
What we have done so far What difference it has made Service
6 The Council has received funding to assess our footways to
determine which, if any, may be appropriate to be exempt from the
pavement parking prohibition. This exercise is ongoing and once
concluded a review of whether any exemption orders are required
will be undertaken.  It is anticipated that the new offences will be
enforced by the Council’s Parking Attendants, commensurate with
their other duties and priorities.
A paper including the implementation of enforcing pavement
parking was presented to the Community and Enterprise
Committee in November 2024.  This referred to a period of soft
enforcement activities where information notices would be
placed on vehicles and then followed by full enforcement.   
A list of streets being considered for exemption will be collated
later in 2025.  To date, approximately 5,000 Penalty Charge
Notices have been issued. 
Awareness of the issues relating to barriers, such as blocking of
footways by parked cars which can prevent some pedestrians
using the footway network safely, has improved.          
Roads,
Transportation
and Fleet
7 Grounds Services provide a Care of Gardens maintenance service
primarily targeted at those who are unable to manage their garden,
particularly older people, and people with a disability. 
This service provided by Ground Services is a basic garden
maintenance service provided to those council tenants free of
charge who qualify, or residents who wish to pay for the service.   
The service ensures that a resident’s garden is maintained to a
basic standard that would allow them to enjoy their garden as it
is, but they can also still get involved to do other minor
gardening, if they wish.  It is good for their physical and mental
health and provides an outdoor space that they can enjoy,
particularly in good weather. 
Grounds 
48

Page 49

Caring, connect, sustainable communities 
What we have done so far What difference it has made Service
8 External Funding Team administers Community Led Local
Development (CLLD) which gives local communities the power to
tackle their own, local challenges. By building knowledge and
skills, supporting new ideas and encouraging cooperation, CLLD
helps to create viable and resilient communities. 
Community Led Local Development - Aims 
CLLD aims to address social, environmental, and economic
issues and include actions affecting rural and island communities
to:
• drive community action on climate change
• enhance rural services and facilities, including transport
initiatives
• enhance natural/cultural heritage, tourism and leisure
• support food and drink initiatives (for example short supply
chains, community food)
• build co-operation with similar groups in Scotland, UK, and
Europe
• empowering communities to exchange learning and
knowledge with each other, realise their potential and build
opportunities for all. 
These programmes address issues such as young people
support groups through peer support (Outreach Community
Church) and Energy efficiency upgrades to homes through an
innovative community approach (Climate Action Strathaven)
In 2024-25, the Community led Local Development programme
provided £473,109 funding to 44 projects in rural Lanarkshire in
22 different communities including the following, for example: 
• Lowther Mens Shed in Leadhills received £20,000 to part
fund the build of a new base.
• Woolfords Auchengray and Tarbrax Improvement
Foundation received £130,000 to develop a community
facility and café and included the redevelopment of the
Cowbyre Café, which will be available for the community and
to generate income. 
• The Machan Trust in Netherburn received £4,168 to
purchase laptops and a printer.  Our trained staff support
families in Netherburn who struggle with online applications,
shopping and accessing benefits.  Also to reduce Food
Poverty, several air fryers were purchased, to use with
groups and to distribute to those who do not have one.  The
trust provides cooking classes and support for families to eat
healthily on a budget.  The purchase of other equipment will
allow the trust to provide cooking support.  The trust works
with families and children’s groups.
• Biggar youth Project received £3,095 to support the
opening of the new centre and provide staff training and
safeguarding awareness and provide furnishings.
• Esteen Clydesdale a mental health charity for the
Clydesdale area that received £5,000 to provide additional
storage facilities.
• Smile a children’s charity that received £4,450 to purchase
new IT equipment. 
• The Haven Caring Counselling Communication Centre
received £12,415 to support equipment costs. 
External
Funding Team
49

Page 50

Caring, connect, sustainable communities 
What we have done so far What difference it has made Service
9 External Funding Team administers the UK Shared Prosperity
Fund (UKSPF) across the four investment themes below: 
- Community and Place 
- Local Business 
- People and Skills 
- Multiply (Numeracy for adults)  
This three-year programme will invest £12,221,811 across three
financial years for 2022-23 to 2024-25.
In 2024-25 the UKSPF supported a range of initiatives in South
Lanarkshire which help embed equalities across many aspects of
service provision including  
- Town centre improvements which enhance accessibility 
- CCTV investment that improves safety 
- Targeted employment support underpinning SLC’s No One
Left Behind Plan, including a focus on those with protected
characteristics.
External
Funding Team
10 The Planning Service prepared a Placemaking in South
Lanarkshire document during the year Placemaking Guide
Summary Planning for developers - South Lanarkshire Council. It
sets out a vision of creating thriving neighbourhoods that are
sustainable and connected where everyone has a place to live
that meets their needs and where health and wellbeing will
flourish. The next step is to prepare detailed guidance to
encourage developers and landowners to create great places.
The document sets out the Council’s vision of creating thriving
neighbourhoods that are sustainable and connected, where
everyone has a place to live that meets their needs and where
health and wellbeing will flourish. It will set the context for the
planning policy position on placemaking in the next Local
Development Plan. The next step is to prepare detailed guidance
to encourage developers and landowners to create great places
and this will be carried out during 2025-26.
Planning and
Building
Standards
11 The Council is working with a Climate Justice PhD student from
Glasgow Caledonian University. They are undertaking a study to
understand who is vulnerable to climate change in South
Lanarkshire and what actions should be taken to ensure that the
transition to net zero carbon emissions is fair to everyone. 
Climate change affects everyone differently. Vulnerable people
are characterised as being most exposed to the negative impacts
of climate change, like heat and flooding. Additionally, factors
such as (but not limited to) income, race, gender, and age may
increase one’s vulnerability. 
The study aims to identify the most vulnerable people in South
Lanarkshire so they can have a say in how the transition to net
zero unfolds. Gathering perspectives of South Lanarkshire
residents will help inform South Lanarkshire Council on how to
best support their communities. This research will ultimately
contribute to policymaking intended to improve the lives of South
Lanarkshire’s residents by reducing both their vulnerability to
climate change and contribution to global carbon emissions.
Through this research South Lanarkshire can work towards a
fairer, greener future for everyone in the region.
Sustainable
Development 
50

Page 51

Inspiring learners, transforming learning, strengthening partnerships   
What we have done so far What difference it has made Service
12 Roads and Transportation have continued to support road safety
education and initiatives, taking a “whole life” approach to road
safety education with initiatives aimed at all ages. The service
believes that good habits are best developed when we are young
and particular emphasis is given to educating and training children
and young people.  Current programmes are: 
• Ziggy’s Road Safety Mission
• Junior Road Safety Officer Scheme 
• Roadstars
• Crash Magnets
• Road Safety Calendar Competition
• Bikeability training 
These programmes provide young people with road safety learning
opportunities and ultimately assist in contributing to the national
casualty reduction targets
Baseline annual average casualty figures between
2014 and 2018 were 580.  There remains a
downward trend with 370 casualties being recorded
during 2023. Final figures for 2024 will be reported
later this year in the Reported Road Casualties
Scotland (RRCS) return. 
The Roads service has made progress towards the
achievement of ‘vision zero’ by 2050 and the interim
target of a 50% reduction in all fatal and serious
casualties, and a 60% reduction in child fatal and
serious casualties by 2030. 
Roads,
Transportation
and Fleet 
51

Page 52

People live the healthiest lives possible 
What we have done so far What difference it has made Service
13 Planning officers held a conference with Seniors Together in
September 2024 as part of its wider engagement on the next Local
Development Plan (LDP). This was followed by participation in a
Community Planning Partnership led event. 
The conference allowed members of Seniors Together
to provide their views on the future of the area including
issues such as safety, housing provision, access to
services and public transport.  The engagement with
Seniors Together has helped facilitate closer
relationships with all age groups and developed an
understanding of the needs of the elderly. These views
will be a key element in the LDP evidence report and in
the development of the proposed plan. 
Planning
and
Building
Standards
/All
14 Facilities Services provides a school meals service for children and
young people in South Lanarkshire. All meals meet the Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations
2020.  The service provides a range of nutritionally balanced menu
options every day, including meals which are suitable for vegetarians. 
There is an adapted diet procedure in place for any child or young
person who has any dietary need, food allergy or intolerance, in which
case a registration form is completed, and menu agreed. In addition
to this, Facilities Services offer cultural menu provision such as Vegan
and Halal menu options and all requests are handled within this
process.
By providing nutritious school meals, Facilities services
are assisting in improving the health and wellbeing of
children and young people in South Lanarkshire. 
The adapted diet procedure allows children and young
people within schools and nurseries who are unable to
eat standard menus, for medical or cultural reasons, to
access the appropriate meals provided. 
The number of adapted diets continues to grow, and
the register now holds 882 adapted diets for medical
reasons and 775 diets for pupils with cultural beliefs. 
Facilities 
52

Page 53

People live the healthiest lives possible 
What we have done so far What difference it has made Service
15 Preparation of a Play Sufficiency Assessment (PSA) is being
carried out as part of the evidence gathering for the next Local
Development Plan. 
Preparation of the PSA has included an assessment
of existing play provision in terms of its quality,
quantity and accessibility across the Council as a
whole and in 14 localities. 
In addition, direct engagement took place with school
children to gather their views on play in their area. The
outcomes of the PSA will be taken forward in the
proposed LDP3.
Planning and
Building
Standards/
Grounds
16 Environmental Services have an ongoing programme of work
designed to prevent the sale of tobacco and Nicotine Vapour
Products (NVPs) to children (under 18s) which assists in the
prevention of children taking up smoking. This includes carrying
out inspections to business which sell such products.
In total, 53 visits have been made to ascertain
compliance with the sale of products which are age
restricted, mainly vapes, and 15 premises were issued
with fixed penalty notices.
Environmental
Services
17 Fleet Services provide transportation services to Education
Resources (primarily school pupils with Additional Support Needs
and pupils attending college) and Social Work Resources (both
Adult Services and Older Peoples Services’ clients).   
This transport service helps children and adults
access school or social care establishments safely
throughout South Lanarkshire. 
Transport is provided for 529 children and 213 adults
in a range of vehicles adapted where necessary to
meet the specific needs of the individual. 
Roads,
Transportation
and Fleet 
53

Page 54

Good quality, suitable and sustainable places to live   
What we have done so far What difference it has made Service
18 South Lanarkshire Local Development Plan (LDP) is a statutory plan
which guides the future use of land in the area within the Council’s
area.  Work has started on the preparation of the third version
(SLLDP3). The first stage involves the preparation of an Evidence
Report which will inform the spatial strategy for South Lanarkshire. It
will be submitted to Scottish Ministers for a Gatecheck following
which preparation of the plan itself will begin. It is anticipated it will
be adopted by the Council towards the end of 2027. 
The Evidence report involves firstly the gathering of extensive data
and information covering 33 policy themes including the location of
new housing and employment; addressing the principles of local
living (the creation of 20-minute neighbourhoods) so that everyone
has access to local services and facilities; health and wellbeing;
sustainable transport and active travel; and tackling the climate and
nature emergencies.   
During the year, extensive engagement has taken place
with other Council services, partners and stakeholders
to help gather data and information and understand the
spatial implications of their own proposals and
strategies. At the same time, wide engagement has
been carried out with local communities and interest
groups to understand their needs and aspirations. This
reflects the key role of the planning system in improving
our local communities and tackling disadvantage and
promoting equality. A Place survey that was published
during the year resulted in over 950 responses. 
The Planning service is a key partner in the Marmot
Place project. The eight principles of a Marmot Place
will be embedded in SLLDP3 and be a driver in the
preparation of the spatial strategy. 
It is intended the Evidence Report will be reported to full
Council in October 2025 for approval following which it
will be submitted to Scottish Ministers for the
Gatecheck. Once it has been cleared, work will start on
the proposed SLLDP3 in early 2026. This will involve
further extensive consultation and engagement. 
Planning
and
Building
Standards
54

Page 55

Thriving business, fair jobs and vibrant town centre   
What we have done so far What difference it has made Service
19 Economic Development continue to lead the delivery of investment
in town and neighbourhood centres which has acted as a catalyst for
additional investment to maximise opportunities for growth. 
This has led to the development of the East Kilbride and Hamilton
Masterplans and subsequent investment of £50.3M and £8M
respectively, alongside support and investment in other town centres
such as Rutherglen with the development of a town centre action
plan, and Lanark with streetscape investment. 
Economic Development continue to look for opportunities to
maximise positive outcomes for town and neighbourhood centres.
Nearly £60M of funding has been secured to realise
the aims of our town centre masterplans. These
masterplans have a commitment to rebalance the
town centres away from an over-reliance on retail,
aiming to forge a community-focused future which
fosters connectivity, liveability and economic vitality for
generations to come. Through the introduction of new
homes, leisure and essential services, all set within a
transformed and greened urban realm, we are
redefining our town centres as a benchmark for 21st
century urban living. The vision is for inclusive and
accessible town centres with increased levels of living,
working and play, regardless of mobility and income.
Over twenty percent of new housing to be developed
on both sites will be social housing. 
Both masterplans, East Kilbride and Hamilton, have
been subject to extensive community consultations,
and we will continue to consult on individual elements
of each plan. The East Kilbride masterplan has been
through a Community Health Impact Assessment –
the outcome of which will inform decisions going
forward, the Hamilton plan will follow. 
We continue to play an active part in all town centres,
liaising with local groups to achieve positive outcomes.
Projects are varied but include looking at accessible
and dementia friendly initiatives in our town centres,
supporting the South Lanarkshire Pride event, and
physical projects to improve the public realm and
attract business to the area. 
Economic
Development
55

Page 56

Thriving business, fair jobs and vibrant town centre   
What we have done so far What difference it has made Service
20 Consumer and Trading Standards have carried out a number of
inspections to local business, ensuring compliance with consumer
protection - consumer safety, weight and measures, fair trading and
animal health. 
The impact of these inspections lifts consumer
confidence and ensures a level playing field for
business in South Lanarkshire.
Environmental
Services 
56