Democracy Spraffa

Agenda Document Pack - Finance and Corporate Resources Committee - 15/02/2023

South Lanarkshire Council · 15 February 2023
Back to Finance and Corporate Resources Committee — 15 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 07 February 2023 
Dear Councillor 
Finance and Corporate Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 15 February 2023
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Lesley McDonald (Chair), Walter Brogan (Depute Chair), Celine Handibode (Depute Chair), Joe
Fagan (ex officio), Alex Allison, Mathew Buchanan, Andy Carmichael, Maureen Chalmers, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Colin Dewar, Mary Donnelly, Grant Ferguson, Gladys
Ferguson-Miller, Graeme Horne, Martin Hose, Katy Loudon, Hugh Macdonald, Catherine
McClymont, Elaine McDougall, Mark McGeever, Richard Nelson, Mo Razzaq, John Ross, Graham
Scott 
Substitutes
John Bradley, Archie Buchanan, Ross Gowland, Gavin Keatt, Susan Kerr, Ross Lambie, Martin
Lennon, Richard Lockhart, Carol Nugent, Norman Rae, Dr Ali Salamati, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Finance and Corporate Resources Committee
held on 16 November 2022 submitted for approval as a correct record.  (Copy
attached) 
5 - 12 
3 Minutes of Appeals Panel
Minutes of the meeting of the Appeals Panel held on 23 November and 21
December 2022 submitted for approval as a correct record.  (Copies attached) 
13 - 16 
Monitoring Item(s) 
4 Revenue Budget Monitoring 2022/2023 - Finance and Corporate Resources
Report dated 10 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
17 - 26 
5 Capital Budget Monitoring 2022/2023 - Finance and Corporate Resources
Report dated 17 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
27 - 30 
6 Finance and Corporate Resources – Workforce Monitoring – September to
November 2022
Report dated 11 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
31 - 38 
7 Council-wide Workforce Monitoring – September to November 2022
Report dated 11 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
39 - 60 
8 Treasury Management Activity – 2022/2023 Third Quarter Review
Report dated 6 February 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
61 - 68 
Item(s) for Decision 
9 Revenue Collection and Approval for Write Offs
Report dated 25 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
69 - 74 
10  Non-Domestic Rates – Empty Property Relief Policy
Report dated 25 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
75 - 84 
Item(s) for Noting 
11  Procurement Strategy Action Plan – Mid Year Update (2022/2023)
Report dated 13 January 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
85 - 94
2

Page 3

12  Finance and Corporate Resource Plan - Quarter 2 Progress Report
2022/2023
Report dated 20 December 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
95 - 112 
Urgent Business 
13  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

FINANCE AND CORPORATE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 16 November 2022 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Alex Allison, Councillor Walter Brogan (Depute), Councillor Mathew Buchanan, Councillor
Andy Carmichael, Councillor Maureen Chalmers, Councillor Margaret Cooper, Councillor Andrea
Cowan, Councillor Colin Dewar, Councillor Mary Donnelly, Councillor Grant Ferguson, Councillor
Gladys Ferguson-Miller, Councillor Celine Handibode (Depute), Councillor Graeme Horne,  Councillor
Gavin Keatt (substitute for Councillor Maureen Devlin), Councillor Richard Lockhart (substitute for
Councillor Richard Nelson), Councillor Katy Loudon, Councillor Catherine McClymont, Councillor
Mark McGeever, Councillor Carol Nugent (substitute for Councillor John Ross), Councillor Mo
Razzaq, Councillor Dr Ali Salamati (substitute for Councillor Hugh Macdonald), Councillor Graham
Scott 
Councillors' Apologies:
Councillor Maureen Devlin, Councillor Joe Fagan (ex officio), Councillor Martin Hose,  Councillor Hugh
Macdonald, Councillor Elaine McDougall, Councillor Richard Nelson, Councillor John Ross 
Attending:
Finance and Corporate Resources
P Manning, Executive Director; G Cochran, Administration Assistant; C Fergusson, Head of Finance
(Transactions); T Little, Head of Communications and Strategy; C Lyon, Administration Officer; G
McCann, Head of Administration and Legal Services; K McVeigh, Head of Personnel Services; L
O’Hagan, Finance Manager (Strategy); B Teaz, Head of IT Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Finance and Corporate Resources Committee held on 7
September 2022 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Minutes of Appeals Panel 
The minutes of the meetings of the Appeals Panel held on 22 September, 25 October and 1
November 2022 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
4 Minutes of Recruitment Committee 
The minutes of the meetings of the Recruitment Committee held on 9 and 20 September and 24
October 2022 were submitted for approval as a correct record. 
2
5

Page 6

The Committee decided: that the minutes be approved as a correct record. 
5 Revenue Budget Monitoring 2022/2023 – Finance and Corporate Resources 
A report dated 19 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted comparing actual expenditure for the period 1 April to 7 October 2022 against
budgeted expenditure for 2022/2023 for Finance and Corporate Resources. 
As at 7 October 2022, there was a breakeven position against the phased budget, detailed in
Appendix A to the report. 
The forecast to 31 March 2023 was a breakeven position. 
Virements were proposed to realign budgets and those movements were detailed in the
appendices to the report. 
The Committee decided: 
(1) that the breakeven position, as detailed in Appendix A to the report, be noted; 
(2) that the forecast to 31 March 2023 of a breakeven position be noted; and 
(3) that the budget virements, as detailed in the appendices to the report, be approved. 
[Reference: Minutes of 7 September 2022 (Paragraph 4)] 
6 Capital Budget Monitoring 2022/2023 – Finance and Corporate Resources 
A report dated 19 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted advising of progress on Finance and Corporate Resources’ capital programme for
2022/2023 and summarising the expenditure position at 7 October 2022. 
The Finance and Corporate Resources’ capital programme for 2022/2023 was £3.695 million. 
Anticipated spend to date was £1.944 million and spend to 7 October 2022 totalled £2.093 million. 
This represented an overspend of £0.149 million. 
The Committee decided: that the Finance and Corporate Resources’ capital
programme of £3.695 million and expenditure to date of
£2.093 million be noted. 
[Reference: Minutes of 7 September 2022 (Paragraph 6)] 
7 Finance and Corporate Resources – Workforce Monitoring – July and August 2022
A report dated 5 October 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on the following employee information for Finance and Corporate Resources for the
period July and August 2022:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases  
6

Page 7

 analysis of leavers and exit interviews
 staffing watch as at 11 June 2022 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 7 September 2022 (Paragraph 7)] 
8 Council-wide Workforce Monitoring – July and August 2022 
A report dated 14 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on the following Council-wide employee information for the period July and August
2022:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 11 June 2022 
The Head of Personnel Services responded to members’ questions on various aspects of the
report.  Following detailed discussion around recruitment statistics, specifically in respect of BAME
Groups and Veterans, it was agreed that further discussion would take place at the Equal
Opportunities Forum and that the Head of Personnel Services would bring a report a future
meeting of this Committee.  It was also agreed that the analysis of leavers’ information be
presented as a number rather than a percentage, going forward, in the same way as reported for
Finance and Corporate Resources’ Workforce Monitoring. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 7 September 2022 (Paragraph 8)] 
Councillor Razzaq left the meeting after this item of business 
9 Treasury Management Activity 2022/2023 – Second Quarter Review 
A report dated 19 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on the second quarter review of Treasury Management activity for 2022/2023. 
Details were given on:- 
 market performance  management of risk
 debt management and borrowing strategy  next quarter investment plans
 investment activity  treasury management indicators 
Officers responded to a member’s question on various aspects of the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 7 September 2022 (Paragraph 9)]  
7

Page 8

10 Revenue Collection and Approval for Write-Offs 2022/2023 
A report dated 28 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on:- 
 collection performance for the financial year 2022/2023 to 30 September 2022 on revenue
income which comprised Council Tax, non-domestic rates, sundry debts and arrears
 performance in the Business Rates Incentivisation Scheme (BRIS)
 the write-off of irrecoverable Council Tax, non-domestic rates, BID levy, sundry debt,
Housing Rent and associated charges, and school meals debt 
Details were provided on collection targets and, at this stage, the Council was ahead of target but
behind comparable performance from 2021/2022 in respect of Council Tax and non-domestic
rates.  In respect of sundry debt, the Council was ahead of target and of comparable performance
from 2021/2022. 
Performance against the BRIS target was closely monitored.  As previously advised to Committee,
the scheme had been suspended for 2020/2021 and 2021/2022 due to the impact of COVID-19. 
Further guidance was awaited from the Scottish Government. 
As agreed by the Executive Committee at its meeting on 21 September 2022, school meals debt
would be taken forward in line with the process for other debt, and that formal write-off of this debt
would be made through this Committee. 
Education Resources would continue to work with schools to review all remaining amounts owed
for school meals.  This exercise would be carried out with the utmost sensitivity and would identify
further cases where the write-off of debt was deemed appropriate.  Those amounts would be
presented to a future meeting of this Committee for approval to write-off. 
It was proposed that the following debts be written off:- 
 irrecoverable Council Tax accounts from 1993/1994 to 2022/2023 to the value of
£278,833.94 relating primarily to prescribed debt, sequestrations and estates of the
deceased
 irrecoverable non-domestic rates from 2020/2021 to 2022/2023 to the value of £260,624.83
relating primarily to debtors in liquidation, had ceased trading or had been sequestrated
 write-off of Business Improvement District (BID) levies totalling £2,309.50 administered by
the Council on behalf of Hamilton, Carluke and Lanark BID companies
 sundry debts to a value of £11,343.86
 former tenant rent arrears totalling £100,267.62, factoring arrears of £19.60 and Housing
Benefit overpayments totalling £20,945.71
 School Meals Debt totalling £67,803.78 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Council’s performance in the collection of revenues be noted; 
(2) that the Council’s performance against the Business Rates Incentivisation Scheme target
be noted; and 
(3) that the write-off of the following irrecoverable debts be approved:- 
 Council Tax debt from 1993/1994 to 2022/2023 to the value of £278,833.94
 Non Domestic Rates from 2020/2021 totalling £260,624.83
 BID levies totalling £2,309.50 
8

Page 9

 sundry debts to a value of £11,343.86
 house rent and associated charges totalling £121,232.93
 School Meals Debt totalling £67,803.78 
[Reference: Minutes of 7 September 2022 (Paragraph 12) and Minutes of the Executive
Committee of 21 September 2022 (Paragraph 12)] 
11 24-Hour Control Centre – Additional Staffing 
A report dated 28 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on additional staffing for the 24-hour control centre at Pollock Avenue, Hamilton. 
The Council’s 24-hour control centre provided 2 key services to residents, the Alarm Receiving
Service and the Out of Hours Emergency Service. 
The Alarm Receiving Service received calls or activations from Social Work service users in need
of assistance through the community alarm system.  The Out of Hours Emergency Service dealt
with calls in relation to any Council service outwith normal office hours. 
The current establishment comprised of 2 Team Leaders, 21 Call Services Assistants, 1
Administration Assistant and 9 sessional/casual Call Services Assistants.  The Team Leaders and
administration employees worked normal office hours and the remaining employees covered a
pattern of 3 shifts. 
The Council also had a contract with Tunstall Healthcare (UK) Limited for the provision of staffing
to support the Alarm Receiving Service in the event of staff shortages.  This service was necessary
as it was not always possible to obtain cover from the existing employee pool.  In September
2021, Tunstall Healthcare (UK) Limited provided notice to the Council that they would be
withdrawing this service from 1 January 2022 due to difficulties experienced with recruitment and
retention. 
As a direct result of this, 2 additional full-time employees were recruited in November 2021 within
the Alarm Receiving Service, for a temporary period of 12 months, covering the period 1 January
2022 to 31 December 2022.  The additional staffing provided a more consistent level of cover and
offset the impact of the withdrawal of the support from Tunstall Healthcare (UK) Limited. 
The appointment of the 2 additional temporary employees had reduced the need for overtime and
also meant that the Council no longer had to pay for external support.  It was proposed that the 2
existing full-time equivalent (FTE) temporary Call Services Assistant posts on Grade 2, Level 1
plus 4 (£25,822 to £26,150) be made permanent and added to the establishment of the 24-hour
control centre within Finance and Corporate Resources. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: that the 2 existing FTE temporary Call Services Assistant
posts, as detailed in Section 5 of the report, be made
permanent and added to the establishment of the 24-hour
control centre within Finance and Corporate Resources. 
In terms of Standing Order No 14, the Chair adjourned the meeting at 2.58pm and reconvened at
3.10pm.  Councillor Cooper was not present when the meeting reconvened  
9

Page 10

12 Early Retirement, Voluntary Severance and Switch 2 
A report dated 18 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on early retirements, voluntary severances, and the Switch 2 programme for the
period 1 April to 30 September 2022. 
Officers responded to a member’s questions on various aspects of the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 7 September 2022 (Paragraph 22)] 
13 Update of the Finance and Corporate Resources’ Risk Register and Risk Control
Plan 
A report dated 18 October 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on the Risk Register and Risk Control actions for Finance and Corporate
Resources. 
The Resource had followed Council guidance in developing, monitoring, and updating its Risk
Control Register on an ongoing basis.  The Register had been developed to ensure that the
Resource was fully aware of the main risks that it had, was able to prioritise those risks and had
controls in place to eliminate or minimise the impact of risk. 
The scoring matrix and definitions for likelihood and impact were outlined in Appendix 1 to the
report.  This had resulted in risks being scored between 1 to 25 (low to very high). Risks were
scored on their inherent risk (risk if nothing was done) and their residual risk (risk after applying
controls). 
The Risk Register had been developed and was monitored on an ongoing basis to add any new
risks and to review the scores of existing risks.  The main changes to the Finance and Corporate
Resources’ risk profile from last year were:- 
 4 new, very high risks had been added to the risk register:-
 ‘the Council was unable to support households most significantly impacted by the cost
of living crisis, resulting in increasing levels of poverty, debt and damage to health’
 ‘the Council fails to deliver the objectives of the Community Wealth Building Strategy’
 ‘the Council was materially affected by the implications arising from the National Care
Service Bill’
 ‘disruption to council services as a result of industrial action’
 1 new high risk had been added, ‘failure to achieve the outcomes of the Council Plan’
 the high scored ‘EU Exit’ risk had been removed
 the risk score for the ‘pandemic’ risk changed from very high to high 
Risks scored 15 to 25 were considered very high and risks scored 8 to 12 were considered high
risks.  The top risks identified for the Resource were detailed in Appendix 2 to the report. 
Appendix 3 provided a comparison of risk scores for 2021 and 2022 and also detailed changes in
risk descriptions. 
There were 4 risk control actions due for delivery between April and September 2022.  3 had been
completed on time, with one ongoing. 
7 actions were due for completion during 2021/2022 and had been completed.  
10

Page 11

There were currently 9 risk actions due for completion during the remainder of 2022/2023, with a
further 2 actions due to be completed in 2023/2024.  Details of those actions were noted at
Appendix 4 to the report.  Outstanding actions to mitigate the risks would be progressed by
relevant officers. 
Within Finance and Corporate Resources, 4 partnerships had been identified, of which the
Community Planning Partnership (CPP) had been assessed as high risk and the remaining 3
partnerships had been assessed as low risk. 
Appropriate risk management arrangements were in place for the CPP, with regular reports on its
risk register and action plan presented to the CPP Board. 
The Committee decided: 
(1) that the contents of the Finance and Corporate Resources’ Risk Register be noted; and 
(2) that it be noted that the outstanding risk control actions would be progressed by relevant
officers. 
[Reference:  Minutes of 10 November 2021 (Paragraph 13)] 
14 Notification of Contracts Awarded – 1 April to 30 September 2022 
A report dated 4 October 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on contracts awarded by Finance and Corporate Resources during the period 1 April
to 30 September 2022. 
In terms of Standing Order Nos 21.8 and 22.5 of the Standing Orders on Contracts, Resources
were required to notify the relevant Committee of contracts awarded.  Details of the contracts
awarded by Finance and Corporate Resources were provided in the appendix to the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 7 September 2022 (Paragraph 21)] 
15 Safety at Sports Grounds – Issue of Special Safety Certificate for Fireworks Event
- New Douglas Park 
A report dated 4 November 2022 by the Executive Director (Finance and Corporate Resources)
was submitted on action taken, in terms of Standing Order No 37(c) in view of the timescales
involved, by the Executive Director (Finance and Corporate Resources), in consultation with the
Chair and an ex officio member, to issue a Special Safety Certificate for the North and West
Stands, Hamilton Academical Football Club (HAFC) Stadium Limited, New Douglas Park, Cadzow
Avenue, Hamilton. 
An application for a Special Safety Certificate had been received from HAFC Stadium Limited to
hold a fireworks event on 4 November 2022.  As the certificate was requited to be issued prior to
the event, the Executive Director (Finance and Corporate Resources), in consultation with the
Chair and an ex officio member, approved the issue of the Special Safety Certificate, subject to
the completion of a satisfactory site inspection. 
A site inspection, attended by representatives of South Lanarkshire Sports Grounds Safety
Advisory Group, had subsequently taken place on 4 November 2022.  Representatives were
satisfied with the event arrangements and the Special Safety Certificate had been issued prior to
the admission of spectators. 
11

Page 12

The Committee decided:  that the action taken, in terms of Standing Order No
37(c), by the Executive Director (Finance and Corporate
Resources), in consultation with the Chair and an ex
officio member, to issue a Special Safety Certificate for
the North and West Stands, HAFC Stadium Limited, New
Douglas Park, Cadzow Avenue, Hamilton, be noted. 
[Reference:  Minutes of 7 September 2022 (Paragraph 23)] 
16 Urgent Business 
There were no items of urgent business. 
12

Page 13

APPEALS PANEL 
Minutes of meeting held in Committee Room 2, Council Offices, Almada Street, Hamilton on 23
November 2022 
Chair:
Councillor Celine Handibode 
Councillors Present:
Councillor Gavin Keatt, Councillor Helen Toner 
Attending:
Finance and Corporate Resources
H Calley, Administration Officer; E Maxwell, HR Business Manager 
1 Declaration of Interests
No interests were declared. 
2 Urgent Business
There were no items of urgent business. 
3 Exclusion of Press and Public
The Panel decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the next item of business on the grounds that
it was likely that there would be disclosure of exempt
information in terms of Paragraph 1 of Part I of Schedule 7A
of the Act. 
4 Appeal Against Dismissal
The Panel considered an appeal (Ref 6/22) by an employee against their dismissal. 
The appellant was present and represented by a trades union representative.  The Council was
represented by a Personnel Adviser.  The Council called a witness and the appellant’s
representative called the appellant.  All parties were heard in relation to the appeal and then
withdrew from the meeting. 
The Panel decided: that the grounds of the appeal had not been substantiated
and the appeal be not upheld. 
3
13

Page 14

14

Page 15

APPEALS PANEL 
Minutes of meeting held in Committee Room 2, Council Offices, Almada Street, Hamilton on 21
December 2022 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Mathew Buchanan, Councillor Ali Salamati 
Attending:
Finance and Corporate Resources
H Calley, Administration Officer; G Robertson, Personnel Adviser 
1 Declaration of Interests
No interests were declared. 
2 Urgent Business
There were no items of urgent business. 
3 Exclusion of Press and Public
The Panel decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the next item of business on the grounds that
it was likely that there would be disclosure of exempt
information in terms of Paragraph 1 of Part I of Schedule 7A
of the Act. 
4 Appeal Against Final Written Warning
The Panel considered an appeal (Ref 9/22) by an employee against their final written warning. 
The appellant was present and represented themself.  The Council was represented by a Human
Resources Business Manager.  The Council called a witness.  All parties were heard in relation
to the appeal and then withdrew from the meeting. 
The Panel decided: that the grounds of the appeal had not been substantiated
and the appeal be not upheld.
3
15

Page 16

16

Page 17

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[p
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2022 to 29 December 2022 for Finance and
Corporate Resources
 provide a forecast for the year to 31 March 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the breakeven position on the Finance and Corporate Resources’
revenue budget, as detailed in Appendix A of the report, and the forecast to
31 March 2023 of breakeven, be noted; and
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the third revenue budget monitoring report presented to the Finance and
Corporate Resources Committee for the financial year 2022/2023. 
3.2. The report details the financial position for Finance and Corporate Resources on
Appendix A, along with variance explanations in Appendices B-H.  This also includes
the forecast position to end March 2023. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Probable Outturn:  Following the Council’s formal Probable Outturn exercise, the
Resource is forecasting a breakeven position.  The Resource has no proposed
transfers to reserves at this point.  This will be confirmed at the year-end. 
5.2. The Resource position is outlined in Appendix A. 
5.4. Position as at 29 December 2022:  As at 29 December 2022, the Resource
position is breakeven. 
5.6. The budget included in Transactions (Appendix C) includes funding for Child
Bridging Payments (£1.890 million) advised as part of Finance Circular 11/2022.
4
17

Page 18

5.7. Virements are proposed to realign budgets.  These movements are detailed in the
appendices to this report, as appropriate.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are general inflation and budget pressures this year which
increase the risk of overspend however we have mitigated this going forward by
providing additional funds in future years’ budget strategy, and in this year, through
some reserve funds available.  There are also emerging underspends in employee
costs which will help offset increasing inflationary pressures. 
7.2. We will also continue to monitor the actual impact through four weekly budget
monitoring meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
10 January 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 29 December 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
18

Page 19

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 29 December 2022 (No.10) 
Finance and Corporate Resources Summary 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 38,472 37,753 719 28,059 27,811 248 Under 0.9% 
Property Costs 1,831 1,791 40 1,427 1,391 36 Under 2.5% 
Supplies & Services 12,354 12,404 (50) 8,398 8,474 (76) Over (0.9%) 
Transport & Plant 73 63 10 44 43 1  Under               2.3% 
Administration Costs 8,971 9,210 (239) 6,406 6,625 (219) Over (3.4%) 
Payments to Other Bodies 9,890 9,929 (39) 5,658 5,734 (76) Over (1.3%) 
Payments to Contractors 259 250 9 223 218 5 Under 2.2% 
Transfer Payments 65,197 63,553 1,634 48,339 46,812 1,527 Under 3.2% 
Financing Charges 1,230 1,310 (80) 934 949 (15) Over (1.6%) 
Total Controllable Exp. 138,267 136,263 2,004 99,488 98,057 1,431 Under 1.4% 
Total Controllable Inc. (90,509) (88,505) (2,004) (54,986) (53,555) (1,431) Under
Recovered  2.6% 
Net Controllable Exp. 47,758 47,758 0 44,502 44,502 0 - 0.0% 
Variance Explanations 
Variance explanations are shown in Appendices B to H as appropriate. 
Budget Virements 
Budget virements are shown in Appendices B to H as appropriate. 
19

Page 20

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 29 December 2022 (No.10) 
Finance – Strategy Services   
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 3,048 3,036 12 2,194 2,164 30 Under 1.4% 1, a
Property Costs 0 0 0 0 0 0 - n/a 
Supplies & Services 19 16 3 10 9 1 Under 10.0% 
Transport & Plant 0 0 0 0 1 (1) Over n/a 
Administration Costs 112 113 (1) 105 106 (1) Over (1.0%) 
Payments to Other Bodies 516 521 (5) 353 353 0 - 0.0% 
Payments to Contractors 22 22 0 15 15 0 - 0.0% 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 16 21 (5) 12 11 1 Under 8.3% 
Total Controllable Exp. 3,733 3,729 4 2,689 2,659 30 Under 1.1% 
Total Controllable Inc. (1,604) (1,588) (16) (79) (67) (12) Under
recovered 15.2% 
Net Controllable Exp. 2,129 2,141 (12) 2,610 2,592 18 Under 0.7% 
Variance Explanations
1. The underspend is a consequence of vacant posts within the Service, which are being considered in line with service requirements 
Budget Virements 
a. Additional Pay Award:  Net Effect £0.114m:  Employee Costs (£0.114m).  
20

Page 21

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 29 December 2022 (No.10) 
Finance – Transactions Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 13,642 13,053 589 9,704 9,447 257 Under 2.6% 1, a, f
Property Costs 1,700 1,688 12 1,369 1,374 (5) Over (0.4)% f
Supplies & Services 5,806 5,763 53 3,430 3,423 7 Under 0.2% b, f
Transport & Plant 6 3 3 3 1 2 Under 66.7% 
Administration Costs 2,915  2,884 31 2,388 2,325 63 Under 2.6% c, f, 2 
Payments to Other Bodies 2,944 2,995 (11)          1,809 1,815 (6) Over (0.3%) d
Payments to Contractors 237 228 9 208 201 7 Under 3.4% f
Transfer Payments 65,187 63,553 1,634 48,339 46,812 1,527 Under 3.2% 3,e
Financing Charges 155 165 (10) 85 77 8 Under 9.4% f          
Total Controllable Exp. 92,592 90,282 2,310 67,335 65,475 1,860 Under 2.8% 
Total Controllable Inc. (69,062) (67,246) (1,816) (48,269) (46,914) (1,355) Under
recovered 2.8% 3,f
Net Controllable Exp. 23,530 23,036 494 19,066 18,561 505 under 2.6% 
Variance Explanations 
1. Employee Costs 
The underspend is a consequence of vacant posts within the Service, which are being considered in line with service requirements. 
2. Administration Costs
The underspend in Administration Costs relates to the timing of spend on the Scottish Child Payment Bridging Payments. 
3. Transfer Payments / Controllable Income
The underspend in Transfer Payments reflects the demand lead spend on Rent Allowance and Rent Rebates and is offset by an under-recovery of
Income. 
Budget Virements 
a. Additional Pay Award: Net Effect: £0.599m, Employee Costs £0.599m.
b. Child Bridging Payments (General Revenue Grant) Net Effect: £1.980m, Supplies and Services £1.980m
c. LACER Funding for SWF and Family Wellbeing Support Fund:  Net Effect £0.624m:  Administration Costs £0.624m.
d. Additional Funding for the Warm Initiative:  Net Effect: £1.445m, Payments to Other Bodies £1.445m.
e. DHPO Benefit Gap (General Revenue Grant): Net Effect: £0.077m, Transfer Payments £0.077m.
f. Internal Budget Realignments: Net Effect: £0.000m, Employee Costs £0.225m, Property Costs (£0.015m), Supplies and Services (£0.032m),
Administration Costs £0.053m, Payments to Contractors (£0.012m), Financing Charges £0.013m, Income (£0.232m) 
21

Page 22

Appendix D 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 29 December 2022 (No.10) 
Audit Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 635 664 (29) 456 488 (32) Over (7.0%) 1, a
Property Costs 0 0 0 0 0 0 - n/a 
Supplies & Services 7 7 0 1 2 (1) Over (100.0%) 
Transport & Plant 0 0 0 0 0 0 - n/a 
Administration Costs 6 6 0 4 3 1 Under 25.0% 
Payments to Other Bodies 1 1 0 0 0 0 - n/a 
Payments to Contractors 0 0 0 0 0 0 - n/a 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 4 4 0 3 3 0 - 0.0% 
Total Controllable Exp. 653 682 (29) 464 496 (32) Over (6.9%) 
Total Controllable Inc. (277) (306) 29 (1) (22) 21 Over
recovered (2100.0%) 2
Net Controllable Exp. 376 376 0 463 474 (11) Over (2.4%) 
Variance Explanations 
1. Employee Costs 
The overspend is mainly due to lower than anticipated staff turnover across the Service to date. 
2. Income
The over-recovery of income reflects staff funded by the European Social Fund. 
Budget Virements 
a. Additional Pay Award: Net Effect: £0.023: Employee Costs £0.023m. 
22

Page 23

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 7 October 2022 (No.7) 
Information Technology Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 5,238 5,274 (36) 3,965 3,984 (19) Over (0.5%) 1,a
Property Costs 0 0 0 0 (13) 13 Under n/a 
Supplies & Services 5,576 5,576 0 4,391 4,417 (26) over (0.6%) b
Transport & Plant 4 4 0 3 2 1 Under 33.3% 
Administration Costs 1,604 1,604 0 937 937 0 - 0.0% 
Payments to Other Bodies 0 0 0 0 0 0 - n/a 
Payments to Contractors 0 0 0 0 0 0 - n/a 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 631 631 0 525 526 (1) Over (0.2%) 
Total Controllable Exp. 13,053 13,089 (36) 9,821 9,853 (32) Over (0.3%) 
Total Controllable Inc. (7,749) (7,749) 0 (2,125) (2,132) 7 Over
recovered (0.3%) 
Net Controllable Exp. 5,304 5,340 (36) 7,696 7,721 (25) Over (0.3%) 
Variance Explanations 
1. Employee Costs
The overspend is mainly due to lower than anticipated staff turnover across the Service to date. 
2. Supplies and Services
The overspend reflects the timing of spend on Computer Equipment Purchases. 
Budget Virements 
a. Additional Pay Award: Net Effect £0.185m: Employee Costs (£0.185m).
b. Transfer from Reserves for LG Digital Transformation Partnership: Net Effect £0.051m, Supplies and Services £0.051m 
23

Page 24

Appendix F 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 29 December 2022 (No.10) 
Personnel Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 9.146 8,801 345 6,840 6,720 120 Under 1.8% 1,
a-d,f
Property Costs 113 98 15 49 27 22 Under 44.9% 
Supplies & Services 193 249 (56) 106 128 (22) Over (20.8%) 
Transport & Plant 19 10 9 7 5 2 Under 28.6% 
Administration Costs 1,098 1,213 (115) 849 992 (143) Over (16.8%) 2
Payments to Other Bodies 4,376 4,399 (23) 2,110 2,180 (70) Over (3.3%) 3,e,g
Payments to Contractors 0 0 0 0 2 (2) Over n/a 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 41 70 (29) 28 40 (12) Over (42.9%) 
Total Controllable Exp. 14,986 14,840 146 9,989 10,094 (105) Over (1.1%) 
Total Controllable Inc. (6,194) (6,226) 32 (1,372) (1,437) 65 Over
recovered (4.7%) 4,g
Net Controllable Exp. 8,792 8,614 178 8,617 8,657 (40) Over (0.5%) 
Variance Explanations 
1. Employee Costs
The underspend in employee costs reflects the level of modern apprentices currently required and also staff working on other funded projects. 
2. Administration Costs
The overspend in Administration Costs reflects the level of training costs and medical expenses incurred to date.   
3. Payments to Other Bodies
The overspend in Payments to Other Bodies is the timing of spend in relation to the Youth Guarantee Programme.  A budget realignment will be funded
by a transfer of prior year funding from Reserves. 
4. Income
The income over-recovery relates to greater than anticipated contributions for Modern Apprentice Programmes. 
Budget Virements 
a. Additional Pay Award:  Net effect: £0.233m, Employee Costs £0.233m.
b. Transfer to Corporate Items to support the Wellbeing Day:  Net Effect: (£0.300m), Employee Costs (£0.300m).
c. Transfer to Corporate Items to support Transformational Change: Net Effect (£0.200m), Employee Costs (£0.200m).
d. Drawdown of Young Person Guarantee Funding:  Net Effect: £0.540m, Employee Costs £0.540m.
e. Drawdown of PACE Funding from Reserves: Net Effect: £0.060m, Payments to Other Bodies £0.060m
f. Transfer of budget from Social Work Resources for contribution to the Maximising Attendance Team:  Net effect: £0.096m, Employee Costs 0.096m.
g. Additional Income in relation to the Kickstart Programme: Net Effect £0.000m, Payments to Other Bodies £0.200m, Income (£0.200m) 
24

Page 25

Appendix G 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 7 October 2022 (No.7) 
Administration, Legal and Licensing Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 4,219 4,260 (41) 3,076 3,118 (42) Over (1.4%) 1,a
Property Costs 18 5 13 9 3 6 Under 66.7% 
Supplies & Services 120 170 (50) 45 80 (35) Over (77.8%) 
Transport & Plant 14 16 (2) 3 3 0 - 0.0% 
Administration Costs 2,094 2,248 (154) 1,495 1,631 (136) Over (9.1%) 2
Payments to Other Bodies 718 718 0 550 550 0 - 0.0% b
Payments to Contractors 0 0 0 0 0 0 - n/a 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 32 68 (36) 21 36 (15) Over (71.4%) 
Total Controllable Exp. 7,215 7,485 (270) 5,199 5,421 (222) Over (4.3%) 
Total Controllable Inc. (2,941) (2,738) (203) (1,631) (1,503) (128) Under
recovered 7.8% 3
Net Controllable Exp. 4,274 4,747 (473) 3,568 3,918 (350) over (9.8%) 
Variance Explanations 
1. Employee Costs
The overspend is mainly due to lower than anticipated staff turnover across the Service to date. 
2. Administration Costs
The overspend in Administration Costs reflects higher than anticipated spend on a number of budget lines including printing and stationery, and
membership fees/subscriptions. 
3. Income
The under-recovery is due to a lower level of Licensing and Registration income generated to date and includes the ongoing impact of the pandemic on
a number of licenses, including taxi licences being applied for in 2022/2023. 
Budget Virements 
a. Additional Pay Award: Net Effect: £0.132m, Employee Costs (£0.132m).
b. Citizen Advice Bureau Funding (Transfer from Communications and Strategy): Net Effect: £0.040m, Payment to Other Bodies £0.040m. 
25

Page 26

Appendix H 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance and Corporate Resources Committee: Period Ended 29 December 2022 (No.10) 
Communications and Strategy Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
29/12/22 
Actual
29/12/22
Variance 
29/12/22 
%
Variance
29/12/22 
£000 £000  £000 £000 £000 £000   
Budget Category         
Employee Costs 2,544 2,665 (121) 1,824 1,890 (66) Over (3.6%) 1,a,b
Property Costs 0 0 0 0 0 0 - n/a 
Supplies & Services 633 633 0 415 415 0 Over 0.0% 
Transport & Plant 30 30 0 28 31 (3) Over (10.7%) 
Administration Costs 1,142 1,142 0 628 631 (3) Over (0.5%) 
Payments to Other Bodies 1,335 1,335 0 836 836 0 - 0.0% c,d
Payments to Contractors 0 0 0 0 0 0 - n/a 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 351 351 0 260 256 4 Under 1.5% 
Total Controllable Exp. 6,035 6,156 (121) 3,991 4,059 (68) Over (1.7%) 
Total Controllable Inc. (2,682) (2,652) (30) (1,509) (1,480) (29) Under
recovered 1.9% 
Net Controllable Exp. 3,353 3,504 (151) 2,482 2,579 (97) Over (3.9%) 
Variance Explanations 
1. Employee Costs
The overspend is mainly due to lower than anticipated staff turnover across the Service to date. 
Budget Virements 
a. Additional Pay Award: Net Effect £0.093m. Employee Costs £0.093m.
b. Emergency Planning Team Transfer: Net Effect £0.136m, Employee Costs £0.136m 
c. Citizen Advice Bureau Funding (Transfer to Admin, Legal and Licensing): Net Effect (£0.040m), Payment to Other Bodies (£0.040m).
d. Additional Foodbank Funding (Transfer from Transactions): Net Effect £0.100m, Payment to Other Bodies £0.100m 
26

Page 27

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Finance and
Corporate Resources for the period 1 April 2022 to 29 December 2022
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Finance and Corporate Resources capital programme of £3.695
million, and expenditure to date of £2.832 million, be noted; and
(2) that the projected outturn of £4.4 million be noted.
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Finance and Corporate
Resources Committee for the financial year 2022/2023.  Further reports will follow
throughout the year. 
3.2. The budget of £3.695 million for Finance and Corporate Resources is based on the
overall Capital Programme for 2022/2023, which was approved by the Executive
Committee on 29 June 2022.  There has been no change to this budget since the
last report to this Committee (16 November 2022). 
3.3. The report details the financial position for Finance and Corporate Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2022/2023 Budget 
As detailed in Section 3.2, the 2022/2023 capital programme for Finance and
Corporate Resources is £3.695 million.  
5
27

Page 28

5.2. 2022/2023 Outturn
Work has been ongoing to monitor the predicted spend position for this financial year
and current estimates from Finance and Corporate Resources suggest an outturn of
£4.4 million, an overspend of £0.705 million.  This mainly relates to the timing of
spend on the Oracle Fusion project, with funding for the overall spend on this project
already identified into next financial year. 
5.3. Period 10 Position 
Anticipated spend to date was £2.247 million and spend to 29 December 2022
amounts to £2.832 million, an overspend of £0.585 million.  Again, this mainly
reflects the timing of spend on the Oracle Fusion project. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend. 
There are detailed project management plans prepared and the risk of overspend on
each project is monitored through four weekly investment management meetings. 
7.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact the supply chain for the foreseeable future.  The impact of this will continue to
be monitored through the four weekly investment management meetings.  Further
updates will be reported in the coming months with any significant increases in
contract values being brought to members’ attention.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
17 January 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 29 June 2022
 Finance and Corporate Resources Committee, 16 November 2022 
List of Background Papers
 Financial ledger to 29 December 2022  
28

Page 29

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy) 
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 
29

Page 30

Appendix A 
South Lanarkshire Council
Capital Expenditure 2022-2023
Finance and Corporate Resources Programme
For Period 1 April 2022 – 29 December 2022 
Finance and Corporate
Resources Total Original
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000
Information Technology Services  3,695 - - 3,695 2,247 2,832
TOTAL 3,695 - - 3,695 2,247 2,832 
30

Page 31

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources – Workforce
Monitoring – September to November 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for September to November 2022 relating to
Finance and Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for September to November 2022
relating to Finance and Corporate Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 10 September 2022 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Finance and
Corporate Resources provides information on the position for September to
November 2022. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of November 2022 for
Finance and Corporate Resources. 
The Resource absence figure for November 2022 was 3.4%, this figure has
decreased by 0.4% when compared to last month and is 3.1% lower than the
Council-wide figure.  Compared to November 2021, the Resource absence figure
has decreased by 0.9%. 
Based on the absence figures at November 2022 and annual trends, the projected
annual average absence for the Resource for 2022/2023 is 3.6%, compared to a
Council-wide average figure of 6.0%.
6
31

Page 32

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
The attendance information contained in this report includes absences as a result of
Covid-19, and employees are being supported through this difficult time to maintain
attendance levels where they can.  At the time of this report, the Council overall
absence level was 6.0% with 0.43% of this relating to Covid-19 for sickness and
special leave. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 61 referrals were made this period.  This represents an
increase of 12 when compared with the same period last year. 
4.3. Accident/Incident Statistics 
There was 1 accident/incident recorded within the Resource this period, this figure
has increased by 1 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 2 disciplinary hearings were held within the Resource.  This figure
has increased by 2 when compared to the same period last year.  No appeals were
heard by the Appeals Panel.  No grievance hearings were raised within the
Resource, this figure remains unchanged when compared to the same period last
year.  No Dignity at Work complaints were raised within the Resource, this figure
remains unchanged when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There were a total of 11 leavers in the Resource this period eligible for an exit
interview, an increase of 6 when compared with the same period last year.  One exit
interview was conducted in this period, a decrease of 1 when compared to the same
period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term post 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period September to November 2022, 27
employees (19.10 FTE) in total left employment, managers indicated that 22 posts
(16.0 FTE) were being replaced, 2 posts (1.0 FTE) were filled on a temporary basis,
1 post (0.71 FTE) was due to the end of a fixed term contract, 1 post (0.60 FTE) is
being held pending a service review and 1 post (0.79 FTE) is being removed for
savings.
32

Page 33

5. Staffing Watch 
5.1. There has been an increase of 36 in the number of employees in post from 11 June
2022 to 10 September 2022. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
11 January 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources – 16 November 2022 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
33

Page 34

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 3.5 2.6 2.8 April 8.5 0.0 0.0 April 3.6 2.6 2.8 April 4.4 4.3 5.6
May 2.3 3.3 3.2 May 16.0 0.0 0.0 May 2.4 3.3 3.2 May 3.1 4.9 5.4
June 1.9 3.5 4.0 June 7.4 0.0 0.0 June 1.9 3.5 4.0 June 2.7 4.7 5.3
July 2.0 3.3 3.9 July 3.5 0.0 0.0 July 2.0 3.3 3.9 July 2.3 4.0 4.6
August 1.8 3.6 4.1 August 12.1 0.0 0.0 August 2.0 3.6 4.1 August 3.1 4.7 4.4
September 2.3 4.0 3.6 September 13.4 0.0 0.0 September 2.4 4.0 3.6 September 4.2 6.4 5.4
October 3.2 3.6 3.8 October 10.2 0.0 0.0 October 3.3 3.6 3.8 October 4.8 6.3 5.8
November 3.1 4.3 3.4 November 11.4 0.0 0.0 November 3.2 4.3 3.4 November 5.8 6.9 6.5
December 2.7 3.8 December 11.4 0.0 December 2.8 3.8 December 5.6 6.9
January 2.8 3.8 January 7.0 0.0 January 2.8 3.8 January 4.8 7.0
February 3.5 3.4 February 0.0 0.0 February 3.5 3.4 February 4.8 6.6
March 3.5 3.4 March 0.0 0.0 March 3.5 3.4 March 4.9 7.9
Annual Average 2.7 3.6 3.6 Annual Average 8.4 0.0 0.0 Annual Average 2.8 3.6 3.6 Annual Average 4.2 5.9 6.0
Average Apr-Nov 2.5 3.5 3.6 Average Apr-Nov 10.3 0.0 0.0 Average Apr-Nov 2.6 3.5 3.6 Average Apr-Nov 3.8 5.3 5.4
981 0 981 16160
APT&C Council WideManual Workers
No of Employees at 30 Nov 2022
Resource Total
No of Employees at 30 Nov 2022
Appendix 1
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Finance and Corporate Resources
No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
34

Page 35

Sep - Nov Sep - Nov
2021 2022
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 18 27
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 49 61
Sep - Nov Sep - Nov
2021 2022
Minor 0 1
Total Accidents/Incidents 0 1
Sep - Nov Sep - Nov
2021 2022
Total Number of Hearings 0 2
Total Number of Appeals 1 0
Appeals Pending 0 1
Time Taken to Convene Hearing September - November 2022
0-3 Weeks 4-6 Weeks Over 6 Weeks
2 0 0
Sep - Nov Sep - Nov
2021 2022
Number of Grievances 0 0
Sep - Nov Sep - Nov
2021 2022
Number of Incidents 0 0
Sep - Nov Sep - Nov
2021 2022
Personal Reasons 0 1
Other 2 0
Number of Exit Interviews conducted 2 1
Total Number of Leavers Eligible for Exit Interview 5 11
Percentage of interviews conducted 40% 9%
ANALYSIS OF REASONS FOR LEAVING
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the "Total
Specified" figures.
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-day"
figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
13 15
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight, serious
burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a chemical or hot
metal burn to the eye or pen
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not lead to
injury of persons, damage to property, plant or equipment but may have done so in different circumstance.
Appendix 2
18 19
0 0
FINANCE & CORPORATE RESOURCES
35

Page 36

FTE H/C FTE H/C
Terminations/Leavers 19.10 27 52.45 67
Being replaced 16.00 22 44.93 57
Filling on a temporary basis 1.00 2 1.00 2
Plan to transfer this budget to another post 0.00 0 2.00 2
End of fixed term contract 0.71 1 2.14 3
Held pending service Review 0.60 1 1.60 2
Plan to remove for savings 0.79 1 0.79 1
Appendix 2a
Reason Sep - Nov 2022 Cumulative total
36

Page 37

As at 10 September 2022
Total Number of Employees
F/T P/T F/T P/T
207 24 415 251
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
2.00 128.41 363.75 223.48 57.49 24.30 6.00 0.00 0.00 805.43
As at 11 June 2022
Total Number of Employees
F/T P/T F/T P/T
199 20 390 252
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
2.00 126.48 332.42 226.70 55.10 24.30 6.00 0.00 0.00 773
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
861
Appendix 3
JOINT STAFFING WATCH RETURN
FINANCE AND CORPORATE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
897
MALE FEMALE TOTAL
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council-wide Workforce Monitoring – September to
November 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period September
to November 2022
[1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for the period September to
November 2022 relating to the Council be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 10 September 2022
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Committee.  This report for the Council
provides information on the position for the period September to November 2022. 
4. Attendance Statistics
4.1. Information on absence statistics for the Council and each Resource, as analysed for
November 2022, is provided in Appendices 1 to 8.  Points to note are:- 
The Council’s absence rate for November 2022, shown in Appendix 1, is 6.5%,
which represents an increase of 0.7% when compared with last month and the figure
has decreased by 0.4% when compared to November 2021. 
When compared to November 2021, the APT&C absence rate has decreased by
0.2%, the teachers’ figure has decreased by 0.9% and the manual workers’ figure
has decreased by 0.1%. 
Based on annual trends and the absence rate to November 2022, the projected
average absence rate for the Council for the financial year 2022/2023 is 6.0%. 
7
39

Page 40

In comparison to November 2021 (Appendix 8):- 
 Psychological and musculoskeletal conditions are the main reasons for 
absence.
 Total days lost due to psychological conditions have increased by 380 days.
 Total days lost due to musculoskeletal conditions have increased by 56
days.
 Total days lost due to respiratory conditions have decreased by 2028 days.
 Total days lost due to stomach, bowel, blood and metabolic disorders have 
increased by 183 days. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
The attendance information contained in this report includes absences as a result of
Covid-19, and employees are being supported through this difficult time to maintain
attendance levels where they can.  At the time of this report, the Council overall
absence level was 6.0% with 0.43% of this relating to Covid-19 for sickness and
special leave. 
5. Occupational Health
5.1. Information on Occupational Health for the period September to November 2022 is
provided in Appendix 9. 
 during the period there were 395 employees referred for a medical examination,
an increase of 4 when compared to the same period last year.  Both
musculoskeletal and psychological conditions continue to be the main reason for
medical referrals.
 a total of 510 employees attended physiotherapy treatment, showing a decrease
of 3 when compared to the same period last year.  Of the 510 employees
referred, 74% remained at work whilst undertaking treatment.  
 during this period 540 employees were referred to the Employee Support Officer,
showing a decrease of 18 when compared with the same period last year.  Of the
referrals made this period, 86% related to personal reasons.
 174 employees were referred to the PAM Assist counselling service this period,
showing a decrease of 8 when compared with the same period last year. All the
referrals made this period were from management and none were made directly
by employees. Personal reasons accounted for 63% of the referrals made, 25%
were for work related reasons and 12% was for other reasons.
 4 employees were referred for Cognitive Behavioural Therapy this period, a
decrease of 4 when compared to the same period last year. 
6. Accidents/Incidents
6.1. The accident/incident report for September to November 2022 is contained in
Appendix 10. 
 the number of accidents/incidents recorded was 591, this figure has increased by
158 from the same period last year. 
 there was 1 specified injury recorded, this figure has increased by 1 from the
same period last year.
 there were 580 minor accidents/incidents, this figure has increased by 166 from
the same period last year.
40

Page 41

 there are 4 accidents resulting in an absence lasting over 3 days during the
period, this figure has decreased by 2 from the same period last year. 
 there were 6 accidents resulting in an absence lasting over 7 days during the
period, this figure has decreased by 7 from the same period last year. 
7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals
7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation
Referrals for September to November 2022 is contained in Appendices 11, 12a and
12b. 
 in total, 41 disciplinary hearings were held across Resources within the Council,
this figure has increased by 2 when compared to the same period last year.
 action was taken in 39 of these cases.  No appeals were raised against the
outcomes.
 our target is to convene disciplinary hearings within 6 weeks, 63% of hearings
met this target.
 during the period, 5 appeals were heard by the Appeals Panel, of which 1 was
upheld in part, 3 were not upheld and 1 was withdrawn.
 at the end of November 2022, 3 Appeals Panels were pending.
 during the period, 3 grievance cases were raised.
 during the period, no Dignity at Work cases were raised.
 during the period, no referrals for mediation were submitted. 
8. Analysis of Leavers and Exit Interviews
8.1. Information on the number of leavers and exit interviews for the period September to
November 2022 is contained in Appendix 13.  Exit interviews are conducted with
employees who leave voluntarily. 
Labour Turnover 
Using information compiled from Resources and Staffing Watch information as at
10 September 2022, the Council’s turnover figure for September to November 2022
is as follows: - 
205 leavers eligible for exit interviews/15,065 employees in post = Labour Turnover
of 1.4%. 
Based on the figure at November 2022, the projected annual labour turnover figure
for the financial year 2022/2023 for the Council is 5.4%. 
8.2. Analysis of Leavers and Exit Interviews 
 there were a total of 205 employees leaving the Council that were eligible for an
exit interview, an increase of 33 when compared with the same period last year.
 there were a total of 67 exit interviews conducted, which is an decrease of 6
when compared with the same period last year. 
8.3. When processing an employee termination, managers are asked to identify whether
they intend to replace the employee who had left the Council.  If they indicate that
they do not intend to replace the employee, they are asked to select from four
options:-
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract
41

Page 42

8.4. Appendix 13a provides information relating to vacant posts and whether these are
being replaced or held for savings. From September to November 2022, 397 (278.44
FTE) employees left employment. Managers indicated that 359 posts (244.85 FTE)
would be replaced, 3 posts (2.00 FTE) were being filled on a temporary basis, the
budgets for 1 post (0.45 FTE) is being transferred to another post, 28 posts (27.12
FTE) were due to the end of fixed term contracts, 4 posts (2.42 FTE) were being left
vacant pending savings or service reviews and 2 posts (1.60 FTE) are planning to be
removed for savings. 
9. Recruitment Monitoring
9.1. Information on Recruitment Monitoring for September to November 2022 is
contained within Appendix 14. 
From an analysis of Equal Opportunities Monitoring Forms, the main points to note
are:-
 overall, 2815 applications and 2764 completed Equal Opportunities Monitoring
Forms were received
 of those applicants who declared themselves as disabled (85), 43 were
shortleeted for interview and 10 were appointed.  
 of those applicants of a black/ethnic minority background (179), 49 were
shortleeted for interview and 11 were appointed.
 Of those applicants who are veterans (40), 28 were shortleeted for interview and
none were appointed. 
10. Staffing Watch
10.1 There has been a decrease of 108 in the number of employees in post from 
11 June 2022 to 10 September 2022. Details of the staffing watch are contained in
Appendix 15. 
11. Employee Implications
11.1. There are no implications for employees arising from the information presented in
this report. 
12. Financial Implications
12.1. All financial implications are accommodated within existing budgets. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no climate change, sustainability or environmental implications arising
from the information presented in this report. 
14. Other Implications
14.1. There are no implications for risk in terms of the information contained within this
report. 
15. Equality Impact Assessment and Consultation Arrangements 
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.
42

Page 43

15.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
11 January 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources Committee – 16 November 2022  
List of Background Papers
 Monitoring information provided by Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
43

Page 44

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 4.2 4.1 5.2 April 2.9 2.5 2.7 April 6.0 6.2 8.8 April 4.4 4.3 5.6
May 2.9 4.7 5.0 May 1.4 3.2 3.6 May 4.9 6.7 7.6 May 3.1 4.9 5.4
June 2.5 4.4 5.0 June 0.9 2.6 2.6 June 4.5 7.0 8.1 June 2.7 4.7 5.3
July 2.2 4.1 4.5 July 0.5 1.1 1.4 July 4.0 6.3 7.4 July 2.3 4.0 4.6
August 2.9 4.6 4.3 August 1.2 2.0 1.4 August 5.1 7.3 7.4 August 3.1 4.7 4.4
September 4.1 6.1 5.2 September 2.7 4.4 2.8 September 5.8 8.5 8.0 September 4.2 6.4 5.4
October 4.7 6.0 5.7 October 3.2 4.1 3.4 October 6.4 8.7 8.1 October 4.8 6.3 5.8
November 5.6 6.5 6.3 November 4.6 5.6 4.7 November 7.3 8.7 8.6 November 5.8 6.9 6.5
December 5.3 6.2 December 4.7 6.1 December 6.9 8.8 December 5.6 6.9
January 4.5 6.7 January 2.7 3.9 January 7.2 10.1 January 4.8 7.0
February 4.3 6.5 February 2.5 3.7 February 7.4 9.5 February 4.8 6.6
March 4.6 8.0 March 2.9 4.3 March 7.2 11.3 March 4.9 7.9
Annual Average 4.0 5.7 5.7 Annual Average 2.5 3.6 3.4 Annual Average 6.1 8.3 8.6 Annual Average 4.2 5.9 6.0
Average Apr-Nov 3.6 5.1 5.2 Average Apr-Nov 2.2 3.2 2.8 Average Apr-Nov 5.5 7.4 8.0 Average Apr-Nov 3.8 5.3 5.4
7673 3969 4518 16160
Appendix 1
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Council Wide
APT&C Teachers
No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
Manual Workers Council Wide
No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
44

Page 45

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 3.1 2.3 4.4 April 5.3 5.7 7.3 April 5.0 5.2 6.9 April 4.4 4.3 5.6
May 2.4 2.7 3.9 May 4.3 6.4 6.8 May 4.0 5.9 6.3 May 3.1 4.9 5.4
June 1.6 2.8 3.5 June 4.0 6.6 7.2 June 3.6 6.0 6.7 June 2.7 4.7 5.3
July 1.8 2.9 3.9 July 3.6 5.3 5.9 July 3.4 4.9 5.6 July 2.3 4.0 4.6
August 1.7 2.9 3.4 August 4.9 6.4 6.6 August 4.4 5.9 6.1 August 3.1 4.7 4.4
September 1.6 3.4 3.1 September 5.8 8.2 7.9 September 5.1 7.5 7.1 September 4.2 6.4 5.4
October 3.1 3.8 5.1 October 6.3 7.9 7.5 October 5.8 7.3 7.1 October 4.8 6.3 5.8
November 3.6 3.5 4.2 November 7.1 8.0 8.3 November 6.6 7.3 7.7 November 5.8 6.9 6.5
December 3.1 4.2 December 6.4 8.0 December 5.9 7.4 December 5.6 6.9
January 3.4 3.6 January 6.0 9.6 January 5.6 8.6 January 4.8 7.0
February 2.8 4.4 February 6.5 9.5 February 5.9 8.7 February 4.8 6.6
March 2.6 6.0 March 6.8 11.0 March 6.2 10.2 March 4.9 7.9
Annual Average 2.6 3.5 4.1 Annual Average 5.6 7.7 8.0 Annual Average 5.1 7.1 7.4 Annual Average 4.2 5.9 6.0
Average Apr-Nov 2.4 3.0 3.9 Average Apr-Nov 5.2 6.8 7.2 Average Apr-Nov 4.7 6.3 6.7 Average Apr-Nov 3.8 5.3 5.4
532 2915 3447 16160No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
Appendix 2
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
45

Page 46

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 3.9 4.8 5.5 April 2.9 2.5 2.7 April 3.3 3.5 4.0 April 4.4 4.3 5.6
May 2.2 5.7 5.5 May 1.4 3.2 3.6 May 1.8 4.4 4.5 May 3.1 4.9 5.4
June 1.8 4.7 5.1 June 0.9 2.6 2.6 June 1.3 3.5 3.7 June 2.7 4.7 5.3
July 1.3 3.4 3.8 July 0.5 1.1 1.4 July 0.9 2.1 2.5 July 2.3 4.0 4.6
August 2.7 3.8 3.6 August 1.2 2.0 1.4 August 1.8 2.8 2.4 August 3.1 4.7 4.4
September 4.8 6.4 5.8 September 2.7 4.4 2.8 September 3.6 5.3 4.1 September 4.2 6.4 5.4
October 5.4 6.6 6.5 October 3.2 4.1 3.4 October 4.1 5.2 4.8 October 4.8 6.3 5.8
November 6.6 8.0 7.9 November 4.6 5.6 4.7 November 5.5 6.7 6.2 November 5.8 6.9 6.5
December 6.5 8.0 December 4.7 6.1 December 5.5 7.0 December 5.6 6.9
January 4.8 8.1 January 2.7 3.9 January 3.6 5.8 January 4.8 7.0
February 4.7 7.2 February 2.5 3.7 February 3.5 5.3 February 4.8 6.6
March 5.6 9.5 March 2.9 4.3 March 4.1 6.7 March 4.9 7.9
Annual Average 4.2 6.4 6.4 Annual Average 2.5 3.6 3.4 Annual Average 3.3 4.9 4.8 Annual Average 4.2 5.9 6.0
Average Apr-Nov 3.6 5.4 5.5 Average Apr-Nov 2.2 3.2 2.8 Average Apr-Nov 2.8 4.2 4.0 Average Apr-Nov 3.8 5.3 5.4
3470 3969 7439 16160
Resource Total
No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
Appendix 3
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Education Resources
Council WideAPT&C Teachers
46

Page 47

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 3.5 2.6 2.8 April 8.5 0.0 0.0 April 3.6 2.6 2.8 April 4.4 4.3 5.6
May 2.3 3.3 3.2 May 16.0 0.0 0.0 May 2.4 3.3 3.2 May 3.1 4.9 5.4
June 1.9 3.5 4.0 June 7.4 0.0 0.0 June 1.9 3.5 4.0 June 2.7 4.7 5.3
July 2.0 3.3 3.9 July 3.5 0.0 0.0 July 2.0 3.3 3.9 July 2.3 4.0 4.6
August 1.8 3.6 4.1 August 12.1 0.0 0.0 August 2.0 3.6 4.1 August 3.1 4.7 4.4
September 2.3 4.0 3.6 September 13.4 0.0 0.0 September 2.4 4.0 3.6 September 4.2 6.4 5.4
October 3.2 3.6 3.8 October 10.2 0.0 0.0 October 3.3 3.6 3.8 October 4.8 6.3 5.8
November 3.1 4.3 3.4 November 11.4 0.0 0.0 November 3.2 4.3 3.4 November 5.8 6.9 6.5
December 2.7 3.8 December 11.4 0.0 December 2.8 3.8 December 5.6 6.9
January 2.8 3.8 January 7.0 0.0 January 2.8 3.8 January 4.8 7.0
February 3.5 3.4 February 0.0 0.0 February 3.5 3.4 February 4.8 6.6
March 3.5 3.4 March 0.0 0.0 March 3.5 3.4 March 4.9 7.9
Annual Average 2.7 3.6 3.6 Annual Average 8.4 0.0 0.0 Annual Average 2.8 3.6 3.6 Annual Average 4.2 5.9 6.0
Average Apr-Nov 2.5 3.5 3.6 Average Apr-Nov 10.3 0.0 0.0 Average Apr-Nov 2.6 3.5 3.6 Average Apr-Nov 3.8 5.3 5.4
981 0 981 16160
APT&C Council WideManual Workers
No of Employees at 30 Nov 2022
Resource Total
No of Employees at 30 Nov 2022
Appendix 4
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Finance and Corporate Resources
No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
47

Page 48

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 4.1 3.2 5.5 April 3.5 3.6 10.6 April 3.8 3.3 7.6 April 4.4 4.3 5.6
May 2.8 2.9 4.5 May 2.0 4.2 8.1 May 2.5 3.4 6.0 May 3.1 4.9 5.4
June 3.2 3.5 4.9 June 2.0 6.2 8.5 June 2.7 4.6 6.4 June 2.7 4.7 5.3
July 2.7 4.0 5.5 July 2.7 5.7 8.9 July 2.7 4.7 6.9 July 2.3 4.0 4.6
August 2.5 4.9 4.7 August 3.4 7.9 7.1 August 2.8 6.2 5.7 August 3.1 4.7 4.4
September 2.1 5.8 4.5 September 3.3 8.1 6.3 September 2.6 6.8 5.2 September 4.2 6.4 5.4
October 2.9 5.2 4.3 October 3.9 9.0 7.8 October 3.3 6.8 5.8 October 4.8 6.3 5.8
November 3.7 5.7 4.6 November 5.6 9.2 7.8 November 4.5 7.2 5.9 November 5.8 6.9 6.5
December 3.3 4.6 December 4.8 9.5 December 3.9 6.7 December 5.6 6.9
January 3.5 5.2 January 4.4 8.8 January 3.9 6.7 January 4.8 7.0
February 3.2 6.4 February 4.7 8.5 February 3.8 7.3 February 4.8 6.6
March 3.1 7.8 March 4.5 10.7 March 3.6 9.0 March 4.9 7.9
Annual Average 3.1 4.9 5.2 Annual Average 3.7 7.6 8.6 Annual Average 3.3 6.1 6.6 Annual Average 4.2 5.9 6.0
Average Apr-Nov 3.0 4.4 4.8 Average Apr-Nov 3.3 6.7 8.1 Average Apr-Nov 3.1 5.4 6.2 Average Apr-Nov 3.8 5.3 5.4
872 575 1447 16160
Council Wide
No of Employees at 30 Nov 2022No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
APT&C Manual Workers
48

Page 49

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 5.5 4.5 6.2 April 10.2 9.6 12.6 April 7.1 6.2 8.3 April 4.4 4.3 5.6
May 4.4 5.0 5.7 May 8.1 9.3 10.1 May 5.7 6.5 7.1 May 3.1 4.9 5.4
June 3.9 3.9 5.9 June 7.6 7.6 11.3 June 5.2 5.2 7.6 June 2.7 4.7 5.3
July 3.7 6.1 6.0 July 6.3 10.3 11.8 July 4.6 7.5 7.9 July 2.3 4.0 4.6
August 4.4 7.3 6.0 August 6.7 10.2 10.8 August 5.2 8.2 7.5 August 3.1 4.7 4.4
September 5.4 7.6 5.9 September 7.5 10.3 9.6 September 6.1 8.5 7.1 September 4.2 6.4 5.4
October 5.9 6.9 5.8 October 8.2 11.3 10.4 October 6.7 8.4 7.3 October 4.8 6.3 5.8
November 6.6 6.2 6.0 November 8.9 10.8 10.4 November 7.4 7.7 7.4 November 5.8 6.9 6.5
December 6.5 5.5 December 10.3 11.1 December 7.7 7.3 December 5.6 6.9
January 5.8 7.4 January 13.1 13.0 January 8.3 9.2 January 4.8 7.0
February 5.1 7.5 February 12.6 10.1 February 7.6 8.3 February 4.8 6.6
March 4.6 8.0 March 10.6 12.8 March 6.6 9.5 March 4.9 7.9
Annual Average 5.2 6.3 6.3 Annual Average 9.2 10.5 11.2 Annual Average 6.5 7.7 7.9 Annual Average 4.2 5.9 6.0
Average Apr-Nov 5.0 5.9 5.9 Average Apr-Nov 7.9 9.9 10.9 Average Apr-Nov 6.0 7.3 7.5 Average Apr-Nov 3.8 5.3 5.4
1818 1028 2846 16160
Manual Workers
No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022 No of Employees at 30 Nov 2022
Appendix 6
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Social Work Resources
APT&C Council WideResource Total
49

Page 50

Appendix 7
Absence by long and short term
From: 1 September 2022 to 30 November 2022
Community and Enterprise 3447 2.7 4.4 7.1 2.4 4.7 7.1 3.1 4.6 7.7
Education 7439 2.0 2.1 4.1 2.0 2.8 4.8 2.6 3.6 6.2
Finance and Corporate 981 1.4 2.2 3.6 1.4 2.4 3.8 1.3 2.1 3.4
Housing & Technical 1447 2.2 3.0 5.2 2.4 3.4 5.8 2.1 3.8 5.9
Social Work 2846 2.1 5.0 7.1 2.3 5.0 7.3 2.5 4.9 7.4
Council Overall for September
2022 to November 2022 16160 2.2 3.2 5.4 2.2 3.6 5.8 2.6 3.9 6.5
Resource
Total
Absence %
October 2022
Total Short
Term %
Total
Long
Term %
November 2022
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
Resource No of
employees
September 2022
Total Short
Term %
Total Long
Term %
Resource Total
Absence %
50

Page 51

From : 1 November 2022 to 30 November 2022
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1608 29 1020 11 58 9 644 37 787 21 4117 19
Psychological 1443 26 3446 36 345 52 390 22 1324 35 6948 33
Stomach, Bowel, Blood, Metabolic Disorders 510 9 1046 11 45 7 101 6 333 9 2035 10
Respiratory 967 17 1873 20 57 9 198 11 521 14 3616 17
Other Classification 1035 19 2082 22 156 24 402 23 836 22 4511 21
Total Days Lost By Resource 5563 100 9467 100 661 100 1735 100 3801 100 21227 100
Total Work Days Available
From : 1 November 2021 to 30 November 2021
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1283 24 1322 13 82 10 421 20 953 24 4061 18
Psychological 1240 23 3076 30 237 30 706 33 1309 32 6568 29
Stomach, Bowel, Blood, Metabolic Disorders 398 7 905 9 34 4 226 11 289 7 1852 8
Respiratory 1368 26 2805 28 234 30 514 24 723 18 5644 25
Other Classification 1049 20 2078 20 205 26 258 12 774 19 4364 19
Total Days Lost By Resource 5338 100 10186 100 792 100 2125 100 4048 100 22489 100
Total Work Days Available
*WDL = Work Days Lost
PercentageTotal WDL
By Reason
73409 152247 18278 29669 52702
REASONS
Community and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Housing and
Technical
Resources
Social Work
Resources
Appendix 8
Attendance Monitoring
Absence Classification
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total WDL
By Reason
72636 152949 19215
Percentage
Housing and
Technical
Resources
Education
Resources
Finance and
Corporate
29438 51119
51

Page 52

Appendix 9
Teachers Others
110 40 47 19 53 126
107 18 50 18 64 134
Sep - Nov 2021 Sep - Nov 2022 Sep - Nov 2021 Sep - Nov 2022 Sep - Nov 2021 Sep - Nov 2022
109 122 124 123 0 0
88 96 258 246 5 2
126 110 18 27 0 0
13 15 46 32 0 0
51 55 112 112 Social Work 1 0
126 112 558 540 Not Disclosed 2 2
513 510 Total 8 4
M S M S M S M S M S M S
Total (Sep - Nov 2022) 43 0 0 0 110 0 0 0 21 0 174 0
Total (Sep - Nov 2021) 45 0 0 0 115 0 0 0 22 0 182 0
Total 174
182
M = MANAGEMENT REFERRAL      S = SELF REFERRAL
Occupational Health Reports
Total
Social Work
Resource
Community and Enterprise
Education (Teachers)
Education (Others)
Total
Resource
Community and Enterprise
Education
Finance and Corporate
Education
Social Work
Housing and Technical
Resource
Community and Enterprise
Total
Finance and Corporate
Housing and Technical
391
No of Employees Referred To Employee Support Officer
Total (Spe - Nov 2022) 395
Total (Sep - Nov 2021)
Finance and Corporate
Housing and Technical
Totals
Total Referrals (Sep - Nov 2022)   
From: 1 September 2022 - 30 November 2022 comparison with 1 September 2021 - 30 November 2021
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work
Total Referrals (Sep - Nov 2021)   
No of Employees Referred For Cognitive Behavioural Therapy
Analysis of Counselling Referrals by Cause
Reason
Work Stress Addiction Personal Anxiety/ Depression Bereavement
No of Employees Referred For Physiotherapy
52

Page 53

2021 2022 2021 2022 2021 2022 2021 2022 2021 2022 2021 2022
Specified Injury 0 0 0 1 0 0 0 0 0 0 0 1
Violent Incident:  Physical 0 0 0 0 0 0 0 0 0 0 0 0
Total Specified Injury* 0 0 0 1 0 0 0 0 0 0 0 1
Over 7-day 7 2 1 2 0 0 3 0 2 2 13 6
Violent Incident:  Physical 0 0 0 0 0 0 0 0 0 0 0 0
Violent Incident:  Verbal 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 7-day** 7 2 1 2 0 0 3 0 2 2 13 6
Over 3-day 1 1 1 1 0 0 0 1 4 1 6 4
Violent Incident:  Physical 0 0 0 0 0 0 0 0 0 0 0 0
Violent Incident:  Verbal 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3-day** 1 1 1 1 0 0 0 1 4 1 6 4
Minor 22 18 13 11 0 1 3 5 13 15 51 50
Near Miss 1 4 2 1 0 0 0 2 3 0 6 7
Violent Incident:  Physical 5 6 309 468 0 0 0 0 15 6 329 480
Violent Incident:  Verbal 5 3 20 36 0 0 2 2 1 2 28 43
Total Minor*** 33 31 344 516 0 1 5 9 32 23 414 580
Total Accidents/Incidents 41 34 346 520 0 1 8 10 38 26 433 591
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury,
a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a period of absence of absence as defined by the HSE. 
*** A minor injury is an injury not covered by " Over 7-day", "Over 3-day" or "Specified".
Housing & Tech
Analysis of Accidents/ Incidents
Comparison
Cause of Accidents/ Incidents to employees
Appendix 10
Social Work TOTALCommunity and Enterprise Education
From: 1 September 2022 - 30 November 2022 comparison with 1 September 2021 - 30 November 2021
Finance and Corporate
53

Page 54

APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total
Community and Enterprise 0 29 N/A 29 0 1 N/A 1 0 28 N/A 28 17 2 10 66% 29
Education 4 0 1 5 1 0 0 1 3 0 1 4 1 0 4 20% 5
Finance and Corporate 2 0 N/A 2 0 0 N/A 0 2 0 N/A 2 2 0 0 100% 2
Housing and Technical 1 0 N/A 1 0 0 N/A 0 1 0 N/A 1 1 0 0 100% 1
Social Work 2 2 N/A 4 0 0 N/A 0 2 2 N/A 4 2 1 1 75% 4
Total  (Sep - Nov 2022) 9 31 1 41 1 1 0 2 8 30 1 39 23 3 15 63% 41
Total  (Sep - Nov 2021) 12 25 2 39 4 1 0 5 8 24 2 34 17 15 7 82% 39
APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total
Total  (Sep - Nov 2022) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total  (Sep - Nov 2021) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 September 2022 - 30 November 2022
Appeal's Panel
Total 1
Not Upheld Withdrawn
Appeals
Pending
Total
3
Resource
Resource
Action Taken
Upheld Upheld in Part
Manual/ Craft
Outcome of Disciplinary Hearings
Manual/ Craft
5
Upheld
APT&C
Upheld in Part
Teachers
% Held within
6 Weeks
No of Appeals
No Action
APT&C 4-6 6+3Teachers Total
No of Disciplinary Hearings
310
Appendix 11
Outcome of Appeals
Not Upheld
From: 1 September 2022 - 30 November 2022 comparison with 1 September 2021 - 30 November 2021
Appeals pending to date
Record of Disciplinary Hearings
No of weeks to convene Disciplinary Hearing
Total
54

Page 55

Appendix 12a
Record of Grievances
From: 1 September 2022 - 30 November 2022 comparison with 1 September 2021 - 30 November 2021
Grievances No of Grievances No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Community and Enterprise 2 1 1 0 0
Social Work 1 0 1 0 0
Total (Sep - Nov 2022) 3 1 2 0 0
Total (Sep - Nov 2021) 4 0 4 0 0
Dignity at Work
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Total (Sep - Nov 2022) 0 0 0 0 0 0
Total (Sep - Nov 2021) 1 0 1 0 0 0
From: 1 September 2022 - 30 November 2022 comparison with 1 September 2021 - 30 November 2021
55

Page 56

Appendix 12b
Referrals for Workplace Mediation
Workplace Mediation Sep-22 Oct-22 Nov-22
No of Referrals 0 0 0
*No of Successful Cases 0 1 0
*No of Unsuccessful Cases 0 0 0
No of cases unsuitable for mediation 1 0 1
Workplace Mediation Sep-22 Oct-22 Nov-22
No of Referrals 0 0 0
*No of Successful Cases 0 0 0
*No of Unsuccessful Cases 0 0 0
No of cases unsuitable for mediation 0 0 0
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
As at November 2022
56

Page 57

Appendix 13
From 1 September 2022 - 30 November 2022
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 3 14 0 4 18 39 1
Personal Reasons 4 4 1 1 1 11 0
Moving outwith area 0 1 0 1 3 5 0
Further Education 0 0 0 0 3 3 0
Travelling difficulties 1 1 0 0 1 3 0
Poor relationship with managers /
colleagues 0 0 0 0 2 2 0
Child Caring / Caring
Responsibilities 1 0 0 0 0 1 0
Other 1 1 0 0 1 3 0
Number of exit interviews
conducted 10 21 1 6 29 67
Total no. of leavers per Resource
eligible for an exit interview 57 55 11 12 70 205
% of leavers interviewed 18% 38% 9% 50% 41% 33%
From 1 September 2021 - 30 November 2021
Number of exit interviews
conducted 13 30 2 8 20 73
Total no. of leavers per Resource
eligible for an exit interview 51 57 5 14 45 172
% of leavers interviewed 25% 53% 40% 57% 44% 42%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
57

Page 58

Resource Total FTE* Total H/C** FTE H/C FTE H/C FTE H/C FTE H/C FTE H/C FTE H/C
Community & Enterprise 95.38 154 68.98 127 0 0 0 0 26.405 27 0 0 0 0
Education 55.59 75 53.63 72 1.00 1 0 0 0 0 0.965 2 0 0
Finance & Corporate 19.10 27 16.00 22 1 2 0.00 0 0.71 1 0.6 1 0.786 1
Housing & Technical 23.42 26 23.42 26 0 0 0 0 0 0 0 0 0 0
Social Work 84.95 115 82.83 112 0 0 0.453 1 0 0 0.852 1 0.81 1
Total 278.44 397 244.85 359 2.00 3 0.45 1 27.12 28 2.42 4 1.60 2
Appendix 13a
September to November
2022 Number of leavers Replace Employee Filling on a temp basis Plan to transfer this budget
to another post End of fixed term post
Leave vacant pending
savings or service
review
Plan to remove for
savings
58

Page 59

Appendix 14
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
2764 1298 508 47% 18% 39%
997 515 193 52% 19% 37%
1758 781 315 44% 18% 40%
85 43 10 51% 12% 23%
2103 948 366 45% 17% 39%
615 330 133 54% 22% 40%
2547 1235 492 48% 19% 40%
179 49 11 27% 6% 22%
40 28 0 70% 0% 0%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
3423 1476 546 39% 13% 34%
1013 359 113 41% 10% 25%
2403 1116 426 37% 16% 43%
128 66 22 53% 11% 22%
2816 1197 448 37% 12% 33%
552 246 85 39% 20% 52%
3253 1421 526 40% 14% 34%
125 34 8 27% 4% 16%
43 24 0 39% 0% 0%
Total Number of appointments: 555
Total No of Veteran applicants
Total No of applicants aged over 50
Total No of Female Applicants
Gender / Disability / Age
Total EO Forms Received
Gender / Disability / Age
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 September 2022 - 30 November 2022
From : 1 September 2021 - 30 November 2021
846
Total Number of applications received:
Total EO Forms Received
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
2815
Total Number of Equal Opportunities Monitoring forms received: 2764
Total Number of posts recruited for:
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Total Number of Equal Opportunities Monitoring forms received: 3423
Total No of applicants aged over 50
Total Number of posts recruited for:
Total No of Veteran applicants
Total Number of appointments: 585
Total Number of applications received: 3486
Total No of Male Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
754
59

Page 60

Resource Total F/T P/T F/T P/T Total Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3137 1287 236 206 1408 2230.86 1.00 1525.42 397.39 233.22 45.23 17.00 2.00 9.60 0.00
Education - Others 3212 143 88 656 2325 2352.27 1.00 1159.20 914.47 143.94 46.60 11.60 4.00 63.66 7.80
Education - Teachers 3876 688 70 2275 843 3515.30 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 3514.30
Finance & Corporate Resources 897 207 24 415 251 805.43 2.00 128.41 363.75 223.48 57.49 24.30 6.00 0.00 0.00
Housing & Technical 1291 823 26 320 122 1233.52 1.00 216.87 615.18 358.87 28.60 11.00 2.00 0.00 0.00
Social Work Resources 2652 223 166 1003 1260 2321.75 1.00 1131.10 572.73 548.36 36.80 29.76 2.00 0.00 0.00
8943.83 (excluding Teachers)
Total All Staff 15065 3371 610 4875 6209 12459.13 6.00 4161.00 2863.52 1507.87 214.72 94.66 16.00 73.26 3522.10
Resource Total F/T P/T F/T P/T Total Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3185 1300 231 196 1458 2244.04 1.00 1543.77 402.16 227.38 45.73 17.00 2.00 5.00 0.00
Education - Others 3207 138 89 651 2329 2347.67 1.00 1178.56 899.35 140.99 45.44 11.60 4.00 58.93 7.80
Education - Teachers 3941 704 71 2330 836 3587.40 0.00 0.00 0.00 0.00 0.00 1.00 0.00 4.60 3581.80
Finance & Corporate Resources 861 199 20 390 252 773.00 2.00 126.48 332.42 226.70 55.10 24.30 6.00 0.00 0.00
Housing & Technical 1299 829 24 320 126 1241.06 1.00 214.12 622.86 358.48 33.60 9.00 2.00 0.00 0.00
Social Work Resources 2680 231 168 1041 1240 2346.88 1.00 1149.08 589.20 542.04 34.80 28.76 2.00 0.00 0.00
8952.65 (excluding Teachers)
Total All Staff 15173 3401 603 4928 6241 12540.05 6.00 4212.01 2845.99 1495.59 214.67 91.66 16.00 68.53 3589.60
Male Female Salary Band
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
QUARTERLYJOINT STAFFING WATCH RETURN : NUMBER EMPLOYED ON 11 JUNE 2022
QUARTERLYJOINT STAFFING WATCH RETURN : NUMBER EMPLOYED ON 10 SEPTEMBER 2022
Analysis by Resource
Analysis by Resource
Appendix 15
Total Number of Employees Full-Time Equivalent
60

Page 61

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Treasury Management Activity – 2022/2023 Third
Quarter Review 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a third quarter review of Treasury Management Activity for 2022/2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted.
[1recs]
3. Background
3.1. In order to provide members with information on the Council’s Treasury Management
activities, a quarterly report is presented to this Committee.  This report covers the
period 1 April 2022 to 31 December 2022. 
4. Market Performance
4.1. After the Bank of England left the base rate unchanged at 0.75% in January 2020,
the onset of the coronavirus epidemic in March of that year resulted in two
emergency cuts, first to 0.25% and then to 0.10%. 
4.2. On 16 December 2021, the Bank of England increased the base rate to 0.25%.  This
was followed by a series of increases throughout 2022 to control rising inflation. 
4.3. On 2 February, the base rate was increased to 4% and the Bank of England Asset
Purchase Programme (commonly referred to as its policy of quantitative easing) was
£844 billion.  The Council’s Treasury Management Advisers are predicting that the
base rate will rise to 4.25% by March 2023. 
5. Debt Management and Borrowing Strategy
5.1. The Council began the year with debt of £993.486m with fixed rate loans from the
Public Works Loans Board (PWLB) making up 99.14% of the debt. 
5.2. Table 1 shows the movement in borrowing from 1 April 2022 to 31 December 2022. 
Short term borrowing reflects borrowing which will mature in the coming year, or
where the debt can be recalled in the coming year. 
8
61

Page 62

Table 1 – Movement in Borrowing to 31 December 2022 
Balance as
at
01/04/2022
£m 
New
Borrowing
£m 
Debt
Maturing
£m 
Debt
Repaid
£m 
Balance as
at
31/12/2022
£m
Increase/
Decrease
in
Borrowing
£m
Short Term
Borrowing 43.884 0.000 (42.307) 0.00 1.577 (42.307)
Long Term
Borrowing 949.602 86.700 0.00 0.00 1,036.302 86.700
TOTAL
BORROWING 993.486 86.700 (42.307) 0.00 1,037.879 44.393 
5.3. In 2012/2013, HM Treasury introduced a “certainty rate” to enable eligible local
authorities to access cheaper PWLB funding, with a 20 basis point (0.20%) reduction
on the standard rate.  South Lanarkshire Council has access to this reduced rate. 
5.4. The Council has an expected borrowing requirement of £151.823 million during
2022/2023 (including borrowing carried forward from last year), of which £86.700
million has been taken to the end of December 2022 as shown in Table 2. 
Table 2 – Details of Long Term Borrowing to 31 December 2022 
Loan
Ref.  Period
Start
Date
Principal
£m
Rate
%
Year
High
Year
Low  Average
513025 2½ - 3 Yrs 13/05/2022 £57.800 2.38 5.42 2.08 3.38
538409 7½ - 8 Yrs 09/08/2022 £28.900 2.43 5.39 2.29 3.48 
5.5. The Executive Director (Finance and Corporate Resources), under delegated
powers, will continue to take the most appropriate form of borrowing depending on
the prevailing interest rates at the time, taking into consideration the differential
between investment earnings and debt costs that remains high. 
6. Investment Activity
6.1. On a daily basis, the Treasury Management section within Finance and Corporate
Resources manages the Council’s cash balances.  These balances can result from
day-to-day cash flow situations where income has been received before expenditure
has taken place, and from the balances held in earmarked reserves for use at a later
date.  It is the responsibility of the section to manage these funds.  The primary
consideration when making deposits is the security of funds.  Secondary to this,
consideration is given to ensuring we have access to funds when necessary, and
that these funds are working as well as they can for the Council. 
6.2. The Prudential Indicators, Treasury Management Strategy and Annual Investment
Strategy Report for 2022/2023 was approved by South Lanarkshire Council on 23
February 2022.  This included details of permitted investments for the Council. 
6.3. Prior to depositing funds with any bank or building society, checks are made with the
Council’s treasury adviser, Link Asset Services, that the institution is considered safe
and that any deposit conforms to their recommended time duration as determined by
their Rating Methodology.  This methodology uses credit ratings, rating watches and
outlooks and credit default swap (CDS) prices to establish a suggested time duration
for deposits. 
62

Page 63

6.4. Deposits made in the period 1 April 2022 to 31 December 2022 totalled £1,260.360
million.  This is the cumulative deposits placed over this period.  This is broken down
per sector and institution in Table 3.  81.60% of these deposits were made with the
UK Government through the Debt Management Office (DMO) deposit facility and
Treasury Bills. 
6.5. In order to manage their cash flow over the short term, local authorities, as part of
normal treasury management activity, will place money on deposit with other local
authorities.  Deposits placed with other local authorities account for 9.68% of
deposits.  Fixed term deposits with Clydesdale Bank accounted for 3.17% of
deposits with the remaining 5.55% placed in call accounts with Bank of Scotland and
The Royal Bank of Scotland. 
Table 3 – Investment Activity 1 April 2022 to 31 December 2022 
Counterparty
Deposit
Totals (£m)
% of
Total
Deposits
Average
Interest
Rate
Deposits in UK Government   
Debt Management Account Deposit
Facility 990.675 78.60% 1.59%
Treasury Bills 37.840 3.00% 1.87%
Total Deposits in UK Government 1,028.515 81.60% 1.60%    
Deposits in UK Local Authorities 122.000 9.68% 2.06%    
Deposits in UK Banks and Building
Societies:   
Clydesdale Bank 40.000 3.17% 2.60%
Bank of Scotland 6.370 0.51% 0.53%
Royal Bank of Scotland 63.475 5.04% 0.14%
Total Deposits in UK Banks and
Building Societies 109.845 8.72% 1.25%
Total Deposits 01/04/2022 to 31/12/2022 1,260.360 100.00% 1.62% 
6.6. The average interest rates achieved from the deposits are also shown in Table 3. 
Interest rates achievable for deposits have been increasing, however there is still a
differential between these and the rates at which the Council can borrow. 
6.7. Actual deposits as at 31 December 2022 totalled £200.600 million. 
7. Management of Risk
7.1. It is recognised that no Treasury Management activity is without risk and practices
are put in place in order to limit risk.  As noted in section 6.2, the Treasury
Management Strategy was approved in February 2022 and set a framework for
Treasury Management activities in 2022/2023.  It also set limits on debt and
investments in order to mitigate risks.  
63

Page 64

7.2. The Annual Investment Strategy for 2022/2023, also approved in February 2022,
included details on how risk would be managed for all permitted investments.  This
included criteria for placing deposits with the Debt Management Office (DMO), UK
Local Authorities, Banks and Building Societies and Money Market Funds. 
7.3. Part of the criteria for counterparties is meeting minimum credit ratings with the three
main rating agencies.  A credit rating evaluates the credit worthiness of an
organisation.  It is an evaluation made by a credit rating agency of the organisation’s
ability to pay back the debt and the likelihood of default. 
7.4. Tables 4 to 6 show a breakdown of deposits with details of the credit ratings of banks
and building societies used from 1 April 2022 to 31 December 2022. Deposits with
the DMO are with the UK Government and so have a rating equivalent to the UK’s
sovereign rating.  Deposits with local authorities are considered to be of very high
credit quality. 
Table 4 – Fitch Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA-) 1,028.515m 81.60%
Deposits with Local Authorities 122.000m 9.68%
A+ F1 69.845m 5.55%
A- F2 40.000m 3.17%
Total  1,260.360m 100.00% 
Table 5 – Moody’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (Aa3) 1,028.515m 81.60%
Deposits with Local Authorities 122.000m 9.68%
A1 P-1 69.845m 5.55%
A3 P-2 40.000m 3.17%
Total  1,260.360m 100.00% 
Table 6 – Standard and Poor’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA) 1,028.515m 81.60%
Deposits with Local Authorities 122.000m 9.68%
A+ A-1 6.370m 0.51%
A A-1 63.475m 5.04%
A- A-2 40.000m 3.17%
Total  1,260.360m 100.00% 
7.5. The tables above show that 91.28% of deposits were made with counterparties of
very high credit quality (DMO/UK Government and other local authorities).  
64

Page 65

7.6. Of the remaining 8.72%, 3.17% were fixed term deposits with Clydesdale Bank and
5.55% were in instant access accounts with The Royal Bank of Scotland and Bank of
Scotland. 
7.7. The graph at Appendix 1 shows the duration of deposits made from 1 April 2022 to
31 December 2022.  The graph shows that, since 1 April 2022, all deposits have
been made for 1 year or less.  The maximum maturity period of 332 days was for a
deposit of £5.000 million. 
8. Next Quarter Investment Plans
8.1. The current investment framework will be continued in the next quarter.  Deposits will
continue to be placed with the institutions where their ratings are consistent with the
Council’s approved criteria.  Deposits will also continue to be placed with the DMO
and UK local authorities. 
8.2. Treasury Bills will be used when they return a higher yield than deposits in the DMO
for the same, very low risk. 
8.3. Deposits may also be placed with selected Money Market Funds that meet the
Council’s approved criteria. 
8.4. We will continue to work with our Treasury Management Advisers, Link, to ensure we
gain all information available on counterparties before any deposits are made. 
9. Treasury Management Indicators
9.1. The purpose of these indicators is to contain the activity of the treasury function
within certain limits, thereby managing risk and reducing the impact of an adverse
movement in interest rates.  However, if these are set to restrictive limits, they will
impair the opportunities to reduce costs/improve performance.  The indicators are
detailed in sections 9.2 to 9.5. 
9.2. Limits for External Debt: The operational and authorised limits for external debt for
2022/2023 were set in the Prudential Indicators, Treasury Management Strategy and
Annual Investment Strategy 2022/2023 approved by South Lanarkshire Council on
23 February 2022.  These are shown in Table 7, along with a column showing the
difference between the actual debt level and the limits (headroom). 
Table 7 – Limits for External Debt 
Estimate as
per 2021/22
Strategy
Minimum
Headroom
to Limits in
period
Headroom
as at
31/12/2022 
£m £m £m
Operational Limit for external debt 1,340.000 279.180 302.121
Authorised Limit for external debt 1,360.000 299.180 322.121 
9.3. The indicator shows that we have not breached the operational and authorised limits
to 31 December 2022.  There has been a minimum level of headroom of £299.180m
between actual and authorised level for external debt in the period to 31 December
2022.  
65

Page 66

9.4. Limits on Maturity Structure: By setting limits on the maturity structure of
borrowing, the exposure to large concentrations of debt needing to be replaced at
the same time in the future at currently unknown rates can be limited.  This
effectively places a limit on exposure to longer term interest rate movement. This is
shown in Table 8. 
Table 8 – Limits on Maturity Structure 
Maturity Structure of Borrowing  
Upper
Limit 
Lower
Limit
Maximum
for period
to 31/12/22 
Actuals as
at 31/12/22
Under 12 months 30% 0% 4.42% 0.15%
12 months and 24 months 30% 0% 2.20% 2.10%
24 months and 5 years 50% 0% 21.71% 21.59%
5 years and 10 years 60% 0% 37.27% 37.27%
10 years and 20 years 60% 0% 6.35% 6.06%
20 years and 30 years 70% 0% 3.06% 2.92%
30 years and 40 years 80% 0% 31.36% 29.91%
40 years and 50 years 90% 0% 0.00% 0.00%
50 years and above 90% 0% 0.00% 0.00% 
9.5. The indicator shows that the upper limits for all maturity profiles have not been
breached to 31 December 2022. 
10. Employee Implications
10.1. There are no employee implications. 
11. Financial Implications
11.1. The current rate of interest receivable remains relatively low but has increased over
recent months. Any deposit interest received offsets Loan Charges made to the
Council’s Revenue budget. 
11.2. The costs of borrowing for capital expenditure have been built into the long-term
Revenue Budget Strategy. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no implications for climate change or sustainability in terms of the
information contained in this report. 
12.2. There is also no requirement to carry out an environmental impact assessment in
terms of the information contained within this report. 
13. Other Implications (Including Environmental and Risk Issues)
13.1. Section 7 of this report provides details of how investment risk is managed. 
14. Equality Impact Assessment and Consultation Arrangements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.  
66

Page 67

14.2. There is no requirement to carry out any consultation in terms of the information
provided in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
6 February 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy
2022/2023, South Lanarkshire Council, 23 February 2022
 Treasury Management Activity – 2022/2023 First Quarter Review, Finance and
Corporate Resources Committee, 7 September 2022
 Treasury Management Activity – 2022/2023 Second Quarter Review, Finance and
Corporate Resources Committee, 16 November 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Jackie Taylor, Head of Finance
Ext:  5637 (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk
67

Page 68

Appendix 1
68

Page 69

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Collection and Approval for Write Offs 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of Revenue Collection performance for financial year
2022/2023 to 31 December 2022
 advise Committee of performance regarding the Business Rates Incentivisation
Scheme (BRIS) for financial year 2022/2023 to 31 December 2022
 seek approval for write offs
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that performance in the collection of revenue be noted;
(2) that the current position in respect of BRIS be noted; and
(3) that write offs for the following be approved:-
 Council Tax £292,163.74
 Non-Domestic Rates £706,171.79
 BID Levy £3,155.56
 Sundry Debt £233,270.78
 Housing Rent and associated charges £380,351.68 
[1recs]
3. Background
3.1. Responsibility for the collection of Council Tax, Non-Domestic Rates (NDR) and
Sundry Debt is the responsibility of Finance and Corporate Resources.  This report
and the attached appendix provide information on collection performance and
proposals for write off. 
4. Current Collection Performance
4.1. The first table in Appendix 1 presents the collection performance for Council Tax,
NDR and Sundry Debts for financial year 2022/2023. 
4.2. The annual Council Tax collection target for 2022/2023 has been set at 95.5%. 
Council Tax collection is currently 90.07%, ahead of target by 0.09% and ahead of
comparable performance in 2021/2022 by 1.98%.  Due to the Scottish Government’s
Cost of Living Award being allocated as an up-front cash payment at the beginning
of the financial year, a comparison with the same period in 2021/2022 is not on a
like-for-like basis.  
9
69

Page 70

4.3. A Non-Domestic Rates (NDR) collection target of 97.5% has been set for 2022/2023. 
NDR collection is currently 74.4%, ahead of target by 0.1% and ahead of
comparable performance in 2021/2022 by 1.6% due to two large energy companies
paying their annual bills in full as opposed to paying by instalments as they have
done in previous years. 
4.4. The 2022/2023 annual target for Sundry Debt collection has been set at 98.0%. 
Sundry Debt collection to 31 December 2022 was 97.8%, behind target by 0.2% but
ahead of comparable performance in 2021/2022 by 1.4%. 
5. Arrears Collection Performance
5.1. Arrears collection performance for Council Tax, NDR and Sundry Debt is presented
in the second table of Appendix 1. 
5.2. The 2022/2023 arrears annual target for Council Tax has been set at £3.500 million,
with collection to 31 December 2022 of £2.945 million, ahead of target by
£0.083 million (2.4%) but behind comparable performance in 2021/2022 by
£0.524 million. 
5.3. The 2022/2023 arrears target for NDR has been set at £2.000 million, with collection
to 31 December 2022 of £2.934 million, ahead of target by £1.027 million (51.3%)
but behind comparable performance in 2021/2022 by £3.769 million. 
5.4. The 2022/2023 arrears target for Sundry Debt has been set at £11.309 million, with
collection to 31 December 2022 of £10.596 million, behind target by £0.023 million
(0.2%) but ahead of comparable performance in 2021/2022 by 12.0%. 
6. Business Rates Incentivisation Scheme
6.1. The Business Rates Incentivisation Scheme (BRIS) is a Scottish Government
initiative to incentivise growth of the local business tax base, with a view to
increasing NDR income yields. 
6.2. The Scottish Government sets annual targets for growth (buoyancy) and councils
who achieve their target retain 50% of the additional income generated above the
target.  The buoyancy target is a measure of the increase in the total rateable value
of the non-domestic properties on the Valuation Roll (including certain categories of
public undertakings). 
6.3. Due to the impact of Covid-19, the Scottish Government confirmed that the scheme
has been suspended for both 2020/2021 and 2021/2022.  Currently, there has been
no update on the reinstatement of BRIS for 2022/2023.  Further guidance and
information is awaited from the Scottish Government. 
6.4. Nonetheless, BRIS performance continues to be monitored closely and is reported to
Committee on a quarterly basis.  Buoyancy for the third quarter, to the end of
December 2022, has seen a decrease of 0.31%. 
7. Proposals for Write Off
7.1. Approval for write off of the following irrecoverable debts is requested from
Committee.  The Council has the power to write off accounts where the debtor is
deceased, sequestrated, in liquidation or the debt is prescribed or where the debt is
deemed uneconomical to pursue.  
70

Page 71

7.2. The proposed write off of Council Tax accounts dating from 1993/1994 to 2022/2023
totals £292,163.74, relating mainly to prescribed debt, sequestrations and estates of
the deceased. 
7.3. The value of accounts currently marked for write off in the Non-Domestic Rates
system from rating years 2020/2021 to 2022/2023 totals £706,171.79.  These debts
are deemed to be irrecoverable because the debtor is in liquidation, has ceased
trading or has been sequestrated. 
7.4. Approval is sought for the write off of Business Improvement District (BID) Levies
totalling £3,155.56, administered by the Council on behalf of the Hamilton, Carluke
and Lanark BID companies.  There is no financial impact on the Council for these
write offs. 
7.5. Following consultation and agreement with Resources, the proposed write off of
Sundry Debt totals £233,270.78.  Appendix 2 provides a breakdown of the proposed
write-off over categories. 
7.6. Approval is sought for the write off of former tenant rent arrears of £316,627.93,
factoring arrears of £407.98 and Housing Benefit Overpayments of £63,315.77. 
7.7. A full list of all debts proposed for write off is held by the Executive Director (Finance
and Corporate Resources). 
8. Employee Implications
8.1. None. 
9. Financial Implications
9.1. Provision has been made for the financial impact of all write offs. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
11. Other Implications
11.1. The main risk associated with the Council’s revenue collection is a failure to monitor
collection rates and take effective corrective action where required, resulting in a
significant reduction in collection performance and Council funding.  The risk is
managed through monthly performance reporting and review of performance at
monthly Senior Management Meetings. 
12. Equalities Impact Assessment and Consultation Arrangements
12.1. There is no requirement to carry out an impact assessment in terms of the proposals
within this report. 
12.2. There is no requirement to undertake any consultation in relation to the content of
this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
25 January 2023  
71

Page 72

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Finance and Corporate Resources Committee - 16 November 2022 
List of Background Papers
 System Reports from Council Tax, Non-Domestic Rates, Sundry Debt and Academy
Housing 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
72

Page 73

Appendix 1        
SOUTH LANARKSHIRE COUNCIL        
REVENUES COLLECTION        
FOR PERIOD ENDING 31 DECEMBER 2022         
Annual Budget           
Cash Target  Actual Variance   % Variance   
Budget to 31/12/22 to 31/12/22 to 31/12/22   to  Notes 
£000's £000's £000's £000's    annual budget          
FINANCIAL YEAR 2022/2023       
Council Tax 145,115  136,727  136,860  132  over 0.09% 
Non-Domestic Rates 320,024  243,874  244,302  428  over 0.1% 
Sundry Debt 151,032  151,032  150,664  (368) under -0.2% 
ARREARS        
Council Tax 3,500  2,862  2,945  83  over 2.4% 
Non-Domestic Rates 2,000  1,907  2,934  1,027  over 51.3% 
Sundry Debt 11,309      10,619     10,596        (23)       under          -0.2% 
73

Page 74

Appendix 2 
BREAKDOWN OF PROPOSED
SUNDRY DEBT WRITE-OFF 
Resource Service No. of Accounts Value (£)
Housing & Technical Rechargeable Repairs 207 80,667.33
H&T General 23 15,423.95
Estates 16 15,313.12
Capital Repairs 2 3,075.51
Social Work Non Residential Services 707 90,639.89
Finance & Corporate Sundry Income Team 1 18,750.00
Housing Benefit Overpayments 7 3,185.14
Finance 3 101.64
Community & Enterprise Facilities 2 4,620.95
Education Education General 1 1,493.25 
Total 969 233,270.78 
74

Page 75

Report
Agenda Item 
Report to: Finance and Corporate Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Non-Domestic Rates – Empty Property Relief Policy 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the devolution of Non-Domestic Rates Empty Property
Relief (EPR) from the Scottish Government to local authorities and seek approval
for the policy to apply in South Lanarkshire Council from 1 April 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the background to the devolution of EPR to councils and the funding
arrangements as set out in the report be noted;
(2) that the EPR Policy to be adopted by South Lanarkshire Council from 1 April
2023, as outlined at section 5, be endorsed and referred to the Executive
Committee for approval; and
(3) that the EPR Policy be reviewed and presented to Committee by March 2024
to allow for a period of stability for rate payers and the Council.
[1recs]
3. Background
3.1. The existing Empty Property Relief (EPR) scheme operates at a national level.  EPR
provides certain rates relief on unoccupied non-domestic properties.  It is currently
mandatory and fully funded by the Scottish Government through the Local
Government Financial Settlement. 
3.2. The Programme for Government 2021/2022 confirmed that the devolution of EPR
would be delivered in April 2023 for the purpose of enabling councils to tailor support
to meet local needs.  This means EPR reliefs and exemptions will no longer be
covered by legislation.  All Scottish councils therefore require to have an EPR Policy
in place from 1 April 2023 as the current legislation governing this will lapse on 31
March 2023. 
3.3. The Council’s current EPR Policy was approved by the Executive Committee in 2010
and was last updated in 2015 to mirror changes in legislation at that time.  
10
75

Page 76

3.4. A total of £105 million is to be devolved across councils by the Scottish Government,
reflecting the Scottish Fiscal Commission (SFC) Medium Term Financial Strategy
(MTFS) forecasts published on 31 May 2022.  The annual allocation of £105 million
is fixed until the next revaluation in 2026.  This considers the impact of the rates
revaluation effective from 1 April 2023 and any inflationary pressures and is fixed
until the next revaluation in 2026.  The Council’s annual allocation from 2023/2024 is
£2.183 million. 
3.5. It will be for local authorities to decide how they use this funding and the reliefs and
exemptions that may apply under a local scheme.  The funding provided is based on
the operation of the current national EPR scheme.  Any changes to the reliefs and
exemptions provided which costs more than the funding will have to be met by the
Council. 
4. Current Position
4.1. Entitlement to EPR and the rate at which it applies is dependent on different factors
relating to the ratepayer and/or the property type.  The current legislative criteria for
awarding EPR are:- 
 Unoccupied industrial property - eligible for 100% relief for the first six months
since becoming unoccupied, and 10% thereafter
 Other (non-industrial) unoccupied property - eligible for 50% relief for the first
three months since becoming unoccupied and 10% thereafter
 Unoccupied properties which meet any of the following criteria - 100% relief
indefinitely
 listed building
 rateable value is under £1,700
 owned by a trustee for sequestration, liquidation or executors
 cannot be occupied by law
 under a compulsory purchase order
 the property has no buildings 
 the owner is in administration (or subject to an administration order)
 the owner is a company or partnership being wound up 
4.2. EPR of £1.505 million was awarded in 2021/2022 against the following relief
categories:- 
Table 1: Total EPR awarded in 2021/2022 
CATEGORY 2021/22 
£000
Industrial 354
Other (Non-Industrial) 584
Insolvency 170
Listed buildings 199
No buildings 147
Rateable Value < £1,700 43
Deceased 8 
1,505 
76

Page 77

5. Proposal
5.1. Devolution of EPR becomes effective at a time of significant change with a major
revaluation of non-domestic rateable values effective from 1 April 2023 (previously
undertaken in 2017) and at a time of major volatility in the economy and financial
uncertainty facing businesses. 
5.2. Maintaining the current provisions would provide some stability and certainty for
businesses and the Council during these challenging times.  It will also provide an
adequate period to assess the benefits of any future amendments to the Policy. 
Indications from other councils is that this is also the approach that they are
adopting.  Clarification is also awaited from the Scottish Government on some
specific aspects of the new arrangements (e.g., how backdated awards of EPR
particularly for non-devolved years should be treated).  It should also be noted that
the Council received confirmation of a revised funding allocation on 24 January
2023. 
5.3. It is recommended that the EPR Policy adopted by from 1 April 2023 reflects the
change in legislation covering EPR and therefore the current policy should be
amended to reflect this.  The proposed policy document is attached in Appendix 1.
This reflects the criteria listed at 4.1. 
5.4. This also recognises that the funding provided is based on the current EPR rules and
regulations. 
5.5. A review of the Council’s EPR Policy will be provided to this Committee by March
2024.  The review will consider potential changes that could be made to the Policy
and their implications with input from Economic Development considered vital. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. Council funding of £2.183 million per annum over the next 3 years is expected to be
sufficient to meet the cost of EPR awards based on the current forecast for
2022/2023 of up to £2.0 million. 
7.2. The Scottish Government recognises that some exceptional economic events may
impact on the number of empty non-domestic properties in an area, and that these
cannot be predicted.  Where an exceptional economic shock has a substantial,
unmanageable impact on an area in respect of a change in empty non-domestic
properties having significant bearing on the settlement agreed, it is expected that
local authorities and COSLA would raise this for discussion with the Scottish
Government in the first instance. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
9. Other Implications
9.1. The devolution of EPR transfers the risk of additional costs arising from increases in
the value of the relief from the Scottish Government to local authorities.  
77

Page 78

10. Equality Impact Assessment and Consultation Arrangements
10.1. An Equality Impact Assessment has been carried out. 
Paul Manning 
Executive Director (Finance and Corporate Resources) 
25 January 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Report to Finance and Information Technology Resources Committee 19 January 2010
– Non-Domestic Rates Unoccupied Property Relief Policy
 Report to Executive Committee 4 November 2015 - Review of Non Domestic Rates
Unoccupied Property Relief Policy 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Fraser Morrison, Revenues and Benefits Manager
Ext: 7436 (Tel: 01698 527436)7
E-mail:  fraser.morrison@southlanarkshire.gov.uk  
78

Page 79

Appendix 1 
Finance and Corporate Resources
Transactions Service
Non-Domestic Rates 
Empty Property Relief Policy 
Subject:   Relief for unoccupied non-domestic properties 
Date:    February 2023 
Reason for change:  Legislative change 
Index           Page 
1. Introduction 2
2. Definition of an unoccupied property 2
3. Eligibility and level of relief 2 
3.1 Levels of relief 2 
3.2 100% relief and exempt categories 2 
3.3 Unoccupied industrial property 3 
3.4 Other (non-industrial) unoccupied property 4 
3.5 Short term partly occupied properties 4 
3.6 Re-occupation rule 4 
3.7 Retrospective relief applications 4
4. Documentary evidence 4
5. Unoccupied repossessed property 5
6. Seasonal occupation 5
7. Showhouses 5
8. Retrospective claims 5
9.   Avoidance of rates charges 5
10. Further information and guidance 5 
79

Page 80

1.         Introduction 
This revised policy reflects changes to the legislative arrangements covering Empty
Property Relief (EPR) and becomes effective from 1 April 2023. EPR provides rates
relief on unoccupied non-domestic properties for ratepayers.  This policy sets out the
qualifying criteria for EPR and the level of relief available, including the timescales. 
The policy also details how eligibility is determined. 
2.        Definition of an unoccupied property 
For the purposes of awarding relief, the following criteria must be met before a
property is considered to be unoccupied: 
• there should be no physical occupation by any person, for any purpose
• the premises must not be open or available to the public
• there should be no stock left on the premises*
• there should be no moveable items left on the premises such as furniture,
equipment, tools or moveable equipment or machinery*.
• the premises, or windows of the premises, must not be used to advertise or
promote any other business or property. 
*Except where these items have been abandoned by a tenant and the claim for relief
is submitted by the landlord. 
3. Eligibility and level of relief 
3.1    There are 4 levels of relief that can be awarded: 
• 100% relief (exemption)
• 100% relief for the first six months followed by a 90% unoccupied charge
(industrial property)
• 50% relief for the first three months followed by a 90% unoccupied charge
(non-industrial property)
• 100% relief for a maximum of three months for partially unoccupied industrial
property. 
3.2 100% relief and exempt categories 
Properties which fall into one of the defined exempt categories listed below are
eligible for 100% relief and are exempt from payment of rates during an unoccupied
period for an unlimited time. 
3.2.1 Properties under a Preservation Order or which are a listed building or ancient
monument 
Most claims under this category will be listed buildings. Confirmation of listed
building or ancient monument status must be obtained from this website: 
http://www.historic-scotland.gov.uk/index/heritage/historicandlistedbuildings.htm 
3.2.2 Rateable value less than £1,700 
Exemption is awarded to all properties where the rateable value is less than £1,700. 
80

Page 81

3.2.3 Trustees and liquidators 
Exemption can be awarded under this category when the person entitled to
possession of the property is so entitled because they are: 
• a trustee under a trust deed for creditors
• a trustee under an award of sequestration
• a liquidator under section 112 or section 145 of the Insolvency Act 1986
 
3.2.4 Executors 
Exemption can be awarded under this category when the person entitled to
possession of the property is so entitled because they are the executor of the estate
of a deceased ratepayer. 
3.2.5 Prohibited by law from occupation 
Properties will be eligible for exemption under this category where a letter or notice
has been served by a recognised authority prohibiting the use of the premises. 
3.2.6 Properties under a Compulsory Purchase Order 
Exemption should be awarded under this category where the ratepayer can provide
proof from either South Lanarkshire Council or any Scottish Government department
indicating that they have, or intend to, compulsorily purchase the premises.
Exemption can be awarded from the date that notice is served on the ratepayer
which is likely to be an earlier date than the actual date of the compulsory purchase. 
3.2.7    Property has no buildings 
Where the subject has no buildings, i.e., an aerial or mast, advertising station etc,
then neither the 50% nor 90% unoccupied rate can be levied. These empty property
relief charges can only be levied on ‘relevant lands and heritages’ which is defined in
the legislation as ‘any lands and heritages comprising one or more buildings or a part
of a building’. Therefore, exemption must also be given in this situation. 
3.2.8 Owner is a company or partnership in administration 
Exemption is awarded where the ratepayer is the property owner and is a company
or limited liability partnership which is subject to an administration order under part II
of the Insolvency Act 1986 or is in administration within the meaning of paragraph 1
of schedule B1 of the Insolvency Act 1986. 
3.2.9 Owner is a company or partnership being wound up 
Exemption is awarded where the ratepayer is the property owner and is a company
or limited liability partnership being wound up in terms of the Insolvency Act 1986. 
3.3 Unoccupied industrial property 
3.3.1 Industrial properties that do not fall into one of the exempt categories above are
eligible for 100% relief for 6 months followed by a 90% empty property charge.
Where a property is receiving 100% relief on 31 March 2023, only the balance of the
6 months relief at this rate will be applicable from 1 April 2023. 
81

Page 82

For the purposes of this policy, the definition of industrial property is: 
"industrial lands and heritages" means lands and heritages (other than retail lands
and heritages) comprising one or more buildings which is, or all of which are,— 
(a) constructed or adapted for use in the course of a trade or business; and 
(b) constructed or adapted for use for one or more of the following purposes, or one
or more such purposes and one or more purposes ancillary thereto:— 
(i) the manufacture, repair or adaptation of goods or materials; 
(ii) the subjection of goods or materials to any process; 
(iii) storage (including the storage or handling of goods in the course of their  
distribution); 
(iv) the working or processing of minerals; 
(v) the generation of electricity; 
"relevant lands and heritages" means any lands and heritages comprising one or
more buildings or a part of a building; 
3.4 Other (non-industrial) properties 
Properties which do not fall into one of the exempt categories above, and are not
industrial properties, are entitled to 50% relief for three months followed by a 90%
empty property charge. Where a property is receiving 50% relief on 31 March 2023
only the balance of the 3 months relief at this rate will be applicable from 1 April
2023. 
3.5 Short term partly occupied properties 
In certain circumstances, unoccupied relief can be awarded where only part of a
property is occupied. This relief is restricted to a maximum of three months on the
unoccupied part and can only be awarded once. The criteria which must be met
before relief can be awarded is as follows: 
• the property must be industrial (see definition above)
• applications can only be considered for the current financial year
• the rateable value of the unoccupied area must be at least 5% of the total
rateable value
• relief cannot be applied for periods of less than 1 month
• relief cannot be applied for periods of more than 3 months
• The claim must be submitted whilst the area remains unoccupied 
A plan of the premises, indicating the unoccupied area, must be sent to the council
with the completed application form. The Lanarkshire Valuation Joint Board will
determine the rateable value of the unoccupied area and relief will be awarded on
this basis. 
3.6 Re-occupation rule 
Non-exempt properties will not be eligible for 50% or 100% relief if the property has
been occupied for less than six months since the last award of relief.  10% relief will
apply in such cases.  
82

Page 83

3.7      Retrospective relief applications 
An award of empty property relief may have to be recalculated in the event that a
retrospective application is received for a past period.  This may result in the
reduction of relief for the existing rate payer. 
4.        Documentary evidence 
4.1      Documentary evidence is required in all cases unless: 
• the rateable value of the subject is £100 or less, or the property description
is ‘ground’ or ‘premises’
• the unoccupied period is less than 1 month
• the application for relief is completed by a trustee, liquidator or administrator
in the case of insolvency
• South Lanarkshire Council is the ratepayer. 
4.2    Examples of documentary evidence are: 
• Zero or minimal use energy bills for the unoccupied period.
• Invoices and receipts for refurbishment works carried out on the property. 
• Evidence of the property advertised for sale or let.
• Time stamped photographic evidence of the inside and outside of the
property. 
• Preservation Orders
• Governing body notice prohibiting occupation
• Compulsory purchase order
• Other evidence / verification that the property is / was unoccupied may be
acceptable by the Council’s Non-Domestic Rates Team. 
5. Unoccupied repossessed property 
Exemption can only be awarded where the property falls into one of the defined
exempt categories in section 3 above. 
6. Seasonal occupation 
Unoccupied relief is not available to the property types below as the rateable value
has been adjusted to take account of seasonal occupation. 
• self-catering units
• holiday cottages
• markets
• other outdoor or tourist attractions 
7. Showhouses 
Showhouses, are entered into the valuation roll whether they are furnished or not
and are not eligible for unoccupied property relief.  
83

Page 84

8. Retrospective claims 
Eligible claims will be processed for the current year and with 6 years retrospection.
As with all claims for unoccupied relief documentary evidence must be supplied
covering the relevant period. 
9. Avoidance of rates charges 
The Council reserves the right to reject an empty property relief application from a
tenant/lease holder where it appears that the property owner has put the agreement
in place for the purpose of avoiding liability for rates charges. 
10.      Further information and guidance 
If you require further information or have any questions about the content of this
procedure, please contact: 
Linda Buchanan 
Team Leader (Non-Domestic Rates and Sundry Income) 
Transactions Service 
Finance and Corporate Resources 
David Dale House 
Blantyre 
Telephone 01698 527442 
linda.buchanan@southlanarkshire.gov.uk 
84

Page 85

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee 
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Procurement Strategy Action Plan – Mid Year Update
(2022/2023) 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on progress in the Procurement Strategy Action Plan for the
period 1 April to 30 September 2022 
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):- 
(1) that the content of the report be noted. 
3. Background
3.1. The Council’s Procurement Strategy 2020/2023 was approved by Executive
Committee on 13 May 2020 and the reviewed Strategy objectives for 2022/2023
were noted by Finance and Corporate Resources Committee on 7 September 2022. 
4. Procurement Strategy and Action Plan Update
4.1. The Procurement Strategy updated for 2022/2023 included seven key strategic
objectives, which linked to key outcomes for the Procurement Service.  An update on
each of these objectives and evidence of progress in working towards these
outcomes is included in Appendix 1 with highlights included below:- 
 publication of the Annual Procurement Report 2021/2022
 contribution to financial savings targets through Procured Spend Review
 supplier liaison on supply chain and inflationary pressures in challenging
economic conditions
 implementation of new Fair Work First criteria from April 2022 and annual
confirmation of payment of Living Wage in all Social Care contracts
 improved local SME engagement in tender events in support of the council’s first
Community Wealth Building Strategy, including a Meet the Buyer event with
North Lanarkshire planned for February 2023 
4.2. The Procurement Strategy Action Plan included specific projects for 2022/2023, in
support of our strategic objectives.  An update on progress across each of the
actions to the end of September 2022 is provided in Appendix 2. 
11
85

Page 86

4.3. A total of 9 actions are included in the action plan for 2022/2023 and progress is
summarised in the table below.  Highlights include:- 
 implementation of Fair Work First standards from April 2022
 progress in Procured Spend review in identifying financial efficiencies totalling
£0.600 million by September 2022
 Prioritisation Framework completed in the Sustainable Procurement Tools and
published in the Annual Procurement Report
 ongoing support for Resources with supply chain issues and inflationary
pressures given wider economic challenges 
Category Number Comment
Green 9 Expected to complete within timescale 
Total 9 
4.4. A new Procurement Strategy for the period 2023 to 2028 is currently under
development. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. There are no financial implications arising from this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1.  The Procurement Service are working with the Scottish Government’s Sustainable
Toolkit, which aims to embed sustainable procurement into the Council’s
procurement processes and monitors progress in achieving the Sustainable
Procurement Duty, including Climate Change objectives. 
7.2.  For 2022/2023 the main activity will focus on the review of the scoring of
sustainability in contracts and progression of the Flexible Framework Sustainability
action plan. 
8. Other Implications
8.1. The Procurement Reform (Scotland) Act 2014 requires any public organisation,
which has an estimated total annual value of regulated procurement spend of £5
million or more, to prepare and publish a Procurement Strategy.  An organisation
must also review its Procurement Strategy annually and make such revisions as it
considers appropriate for the purposes of the Act.  The risk of non-compliance is
mitigated by the proposals in this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. There is no requirement to carry out an equality impact assessment in terms of the
proposals contained within this report. 
9.2. As this is a monitoring report, no consultation is appropriate or necessary. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
13 January 2023 
86

Page 87

Link(s) to Council Values/Ambitions/Priorities
 Accountable, effective, efficient and transparent 
Previous References
 Procurement Strategy 2020-2023 Review 2022/2023: Finance and Corporate
Resources Committee 7 September 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Name: Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951 (Tel:  01698 454951)
E-mail: craig.fergusson@southlanarkshire.gov.uk 
87

Page 88

Appendix 1
Procurement Strategy 2020-2023 Key Objectives 
Objective Aim Outcome  Progress
Compliance Ensure compliance with
Procurement Regulations and the
Council’s Standing Orders on
Contracts
Improve compliance and mitigate
risk of contract challenge 
Satisfactory: Procurement continue to monitor
compliance with regulations and Standing
Orders on Contracts across the Council,
including publication of the Annual Procurement
Report. 
Value for
Money
To secure Best Value, balancing
cost and quality of service and
support the Council in achieving
budget savings 
Improved Value for Money in
support of the Council's Financial
Strategy
Satisfactory: Procurement continue to work with
Resources in recognising demand and cost
drivers and identifying opportunities for
efficiencies, as evidenced by:
• Efficiency opportunities identified in the
Procured Spend review under Council’s
Transformational Review Programme
Collaborative Identify and influence collaborative
opportunities to work with public
partners and drive value through
the power of public sector
procurement 
Improved levels of collaborative
activity and delivery of
efficiencies 
Satisfactory: We continue to engage with
procurement partners to identify collaborative
opportunities and influence development of
collaborative working, as evidenced by: 
• 93% participation in Scotland Excel
frameworks and positive engagement
with other collaborative partners,
including Scottish Procurement Alliance,
Procurement for Housing and Hub South-
West.
Contract and
Supplier
Management
Support Resources to take a
proactive approach to contract and
supplier management to achieve
innovation and value in contract
delivery 
Ensure suppliers meet
contractual obligations, drive
improvements in supplier
performance and achieve
efficiency improvements 
Satisfactory: We can demonstrate an effective
approach to contract and supplier management,
as evidenced by:
• Extensive liaison with suppliers on
inflationary and supply chain issues in a
challenging economic environment
• Positive contract management
engagement with Social Care providers
to support H&SCP 
88

Page 89

Appendix 1
Fair Work
Practices
Work with suppliers to improve Fair
Work Practices, including payment
of the Living Wage and compliance
with Council Charters 
Improved Fair Work Practices
and Living Wage for those
involved in delivery of Council
contracts 
Satisfactory: We continue to promote Fair Work
Practices and payment of the Living Wage, as
evidenced by:
• Annual confirmation of payment of Living
Wage in all Social Care contracts
• Implementation of new Fair Work First
standards from Scottish Government by
April 2022 
Sustainable
and Ethical
Secure wider social, economic and
environmental benefits through
contracts as set out in the
Sustainable Procurement Duty 
Meet the Sustainable
Procurement Duty 
Satisfactory: working with the Scottish
Government’s Sustainable Procurement Toolkit,
the council has:
• Committed to six monthly updates of the
Flexible Framework to assess the
organisational progress with sustainable
procurement. 
• Completed the Prioritisation tool to inform
the Council’s priorities for sustainable
outcomes for contracts and published the
outcomes in the annual report. 
Community
Wealth Building
Support and encourage the local
economy to grow sustainably
through the effective use of
procurement to develop local
communities and maximise use of
Community Benefits 
Ensure the spending power of the
Council and Community Benefits
contribute towards Community
Wealth and achieve National
Outcomes 
Satisfactory: Procurement contributes to the
local spend pillar under the Community Wealth
Building Strategy, as evidenced by: 
• We continue to engage with local
suppliers and SMEs to promote contract
opportunities and our joint work in this
area is continuing with the Supplier
Development Programme and Economic
Development partners.
• A joint in person Meet the Buyer event is
being planned with North Lanarkshire
Council for February 2023. 
• Monitoring of the impact of the new Quick
Quote for Works under £2m projects.   
89

Page 90

Appendix 2 
Procurement Strategy Action Plan 2021/2022 
Action  Strategic
Objective  Responsibility Timescale Status Update
Sustainable Procurement toolkit
progress: update Flexible Framework 6
monthly 
Sustainable and
Ethical
Procurement  31 March 2023 Green Flexible framework
updated in
September 2022
Sustainable Procurement: complete
Prioritisation Framework consultation with
Resources and complete pilot
Sustainability Test 
Sustainable and
Ethical
Procurement 30 June 2022 Green Prioritisation
Framework
completed June
2022. Pilot
sustainability test for
Household Waste
Recycling Centres
will be progressed for
the 2023 tender
process. 
Continue to monitor commodity and
pricing pressures following EU Exit, Covid
19 recovery and general economic
impacts
Contract and
Supplier
Management
Procurement &
Resources
31 March 2023 Green Procurement Service
continue to support
contract managers in
dealing with
inflationary
pressures. 
Support Scotland Excel’s savings review
project and consider Benefit Tracking
framework
Value for Money Procurement &
Resources
31 March 2023 Green Procurement Service
are supporting the
projects
recommended by the
Procured Spend
review. 
90

Page 91

Appendix 2 
Action  Strategic
Objective  Responsibility Timescale Status Update
Implementation of Community Benefit
monitoring arrangements and review the
scope of the Community Benefits menu.
Including scope for Community Wish-lists
Sustainable and
Ethical /
Community Wealth
Building
Procurement /
Community
Engagement
Team /
Resources
31 March 2023  Green  Community Benefit
officer in post from
October 2022 and
plans are in place to
review the CB
strategy and points
menu and implement
monitoring
arrangements.
Ongoing liaison with
Community
Engagement Team
on Community Wish
List approach
Progress the action plan for the Spend
Pillar to support the delivery of the
objectives of the Community Wealth
Building strategy.  
Community Wealth
Building 
Procurement /
Economic
Development 
31 March 2023  Green Procurement
contribute to the
Community Wealth
Building Spend Pillar
Action plan, with
specific focus on
supplier engagement
events and working
with Resources to
identify suitable
projects for Quick
Quote. 
Monitor the impact of new Fair Work First
framework and monitor Scottish
Government guidance on Living Wage 
Fair Work First Procurement  31 March 2023 Green  Fair Work First
implemented from 1
April 2022 and
approach to Living
Wage is being
developed.  91

Page 92

Appendix 2 
Action  Strategic
Objective  Responsibility Timescale Status Update
Monitor implications of introduction of
National Care Service on Social Care
commissioning arrangements and
implement revised contractual
arrangements in accordance with SPPN7 
Contract and
Supplier
Management
Procurement and
H&SCP
31 March 2023 Green Procurement and the
HSCP continue to
consider the
recommendations of
SPPN7 for all Social
Care contractual
arrangements,
although no further
guidance has been
issued by Scottish
Government. 
92

Page 93

Appendix 2 
Action  Strategic
Objective  Responsibility Timescale Status Update
Support Oracle Fusion project to
transform Procure to Pay systems
Compliance Procurement 31 March 2023 Green Good progress is
being made on the
development of the
new contract and
supplier performance
management
modules in Oracle
Fusion. Extensive
discussions with
Resources on the
review of No PO, No
Pay policy,
specifically on the
issue of Purchase
Orders for Works. A
revised set of
purchasing controls
has been reviewed
by Internal Audit and
is with the
Procurement
Network for
Resource comment.   
93

Page 94

94

Page 95

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 15 February 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resource Plan: 
Quarter 2 Progress Report 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Finance and Corporate Resource Plan Quarter 2 Progress Report
2022/2023, for the period 1 April 2022 to 30 September 2022
[1purpose]
2. Recommendations
2.1. The Committee is asked to note the following recommendation(s):-
[
(1) that the Finance and Corporate Resource Plan Quarter 2 Progress Report
2022/2023 as summarised in paragraph 5.2. and attached as Appendix 2 of
this report, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3. of this report, be noted;
(3) that the areas for improvement and associated management actions as
detailed in paragraph 5.4. of this report, be noted; and
(4) that the additional scrutiny of reporting the updated status of those measures
identified as ‘report later’ at Quarter 4 2020/2021, as summarised in
paragraph 5.5., be noted. 
3. Background
3.1. The Finance and Corporate Resource Plan 2022/2023 was approved by the
Executive Committee on 24 August 2022 and noted by this Committee on 7
September 2022 and sets out the outcomes, measures and actions to be managed
and delivered by the Resource in the financial year 2022/2023. 
3.2. The Resource Plan follows the agreed corporate structure and style.  The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
3.3. As Elected Members are aware, from March 2020 onwards at times the Council was
forced to suspend or reduce a number of services that could not be continued in full
due to the Covid pandemic.  The Council was also obliged to redirect resources so
that it could deliver vital new services and supports for individuals, communities, and
businesses.  Despite the return of services through the Council’s Recovery Plan
there is a Covid legacy in terms of a residual impact on some services and a
significant build-up of demand, as a result of which there remains an inevitable
impact on performance in some areas. 
12
95

Page 96

4. Resource Objectives 2022/2023
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2022/2023.  These are detailed at Appendix 1. 
5. Quarter 2 Progress Report 2022/2023
5.1. Progress against all Resource Plan measures is contained in the Quarter 2 Progress
Report 2022/2023, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:- 
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report.  To ensure adequate scrutiny of performance across all Resources, the
Council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or
‘amber’ measures at a future meeting. 
The overall summary of progress to date is as follows and performance should be
considered in the context of the impact of responding to Covid 19:- 
Status Measures
Statistical  Project  Total %
Blue N/A 2 2  4%
Green  16 23 39     85%
Amber  1 0 1    2%
Red     0 1 1    2%
Report later/Contextual 0 3 3     7%
Totals  17 29 46 100%  
(Data correct as at 20 December 2022) 
5.3. Key achievements for 2022/2023, to date, are noted below:- 
5.3.1. 
Connect Outcome Communities and Environment 
Resource Outcome Achievement
Individuals and
communities in
South Lanarkshire
are engaged and
able to participate in
decision-making
processes
In pursuit of developing bespoke locality planning, two
partnerships have been established in
Cambuslang/Rutherglen and Clydesdale, chairpersons are
in place and have joined the Community Planning
Partnership Board. 
96

Page 97

Connect Outcome Education and Learning 
Resource Outcome Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome Health and Wellbeing 
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome Children and Young People 
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome Housing and Land 
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome  Our Economy
Resource
Outcome
Achievement
A people-centred
approach to
recovery is
implemented to help
individuals,
communities,
businesses and the
social and third
sector thrive
At the Community Wealth Building (CWB) Commission on
6 September an input from the Centre for Local Economic
Strategies (CLES)/Scottish Government provided an
opportunity for a wide-ranging discussion of CWB both in
the UK and elsewhere, which will feed into the further
development of the strategy in South Lanarkshire.  Further
sessions will be held later in the year.
We support a range of Modern Apprentices in Care,
Digital/IT, Construction and Business Administration.  The
programme is on target, with 32 starts to date 
5.3.2. In addition to working towards these Outcomes, we recognise that the council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value.  
97

Page 98

Delivering the Plan and achieving Best Value
Resource
Outcome
Achievement 
The Council
demonstrates high
standards of
governance and
sound financial
stewardship
The Council's Revenue Budget Strategy for 2023-24 was
approved by Council on 15 June 2022.  An update was
approved by the Executive Committee in September 2022,
with further updates to be provided as required.
Customers
experience high
quality and
improving Council
services 
Licensing and Registration implemented a remote birth
registration service, providing customers with the option of
registering a birth either in person or over the phone.
The use of 'real-time' messaging within Finance
Transactions has been implemented within the Benefits and
Council Tax Call Centre and is being rolled out to other
teams ie Non Domestic Rates (NDR), Customer Service
Centre (CSC).  This enables call handlers to issue links to
online forms/web content to callers to promote customer
self-service for enquiries, such as applying for
Benefits/discounts and registering for myaccount.
The new Council Plan 2022 to 2027 and the new
Community Plan 2022 to 2032 were completed and
approved by the full Council on 15 June 2022
The workforce has
the skills, flexibility
and capacity to
deliver the
Council’s priorities
During the period 1 April to 30 September 2022, SLC
employees completed 59,196 eLearning modules. 
In the same period, 3,751 employees attended 665
classroom-based events, and 1,053 employees attended
112 virtual online events.
Digital and ICT
services meet the
needs of the
Council and its
customers
• Implemented a new home care workforce scheduling
system.
• Upgraded Audio Visual systems within the Council
Chambers.
• Refreshed network equipment across the schools estate. 
5.4. Areas for improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why, and the
management action now being taken, where applicable. 
Delivering the plan and achieving Best Value
Resource Outcome:   Digital and ICT services meet the needs of the council and
its customers
Measure  Comments/Progress Action by Manager 
(where applicable)
Migrate to new
Integrated Housing
and Property
Management system
by Nov 2022
Due to COVID and other
technical reasons, the project
has experienced delays and is
to be rescheduled.
Project rescheduled for
implementation in
October 2023 
98

Page 99

5.5. Report later
Measures in the quarterly progress reports which are not red, amber or green can be
assigned a status of ‘report later’ or ‘contextual’.  Of the 3 measures identified in
these categories at Quarter 4 2021/2022, one was a contextual measure, for which
figures and narrative were provided in the Q4 report.  Two are Local Government
Benchmarking Framework (LGBF) indicators, for which the 2021/2022 results will not
be published until February 2023.  No further action is required. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The Resource Plan takes into account Resource responsibilities in relation to
sustainable development and climate change. 
9. Other Implications
9.1. There are no other implications as a result of this report. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
20 December 2022 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027 
Previous References
 Finance and Corporate Resources Quarter 4 Progress Report 2021/2022 - 7 September
2022  
99

Page 100

List of Background Papers
 Council Plan Connect 2022 to 2027 – approved by the full Council on 15 June 2022
 Finance and Corporate Resource Plan 2022/2023 – approved by the Executive
Committee on 24 August 2022 and noted by Finance and Corporate Resources
Committee on 7 September 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little (Head of Communications and Strategy)
Ext:  4904 (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk
100

Page 101

Appendix 1 
Finance and Corporate Resource Outcomes 2022-23   
Connect Outcomes  Resource Outcomes
Communities and
Environment 
• Individuals and communities in South Lanarkshire are
engaged and able to participate in decision-making
processes
Education and
Learning 
• No Resource Outcomes for this Connect Outcome
Health and
Wellbeing
• No Resource Outcomes for this Connect Outcome
Children and Young
People 
• No Resource Outcomes for this Connect Outcome
Housing and Land  • No Resource Outcomes for this Connect Outcome
Our Economy  • A people-centred approach to recovery is implemented to
help individuals, communities, businesses and the social
and third sector thrive 
Delivering the Plan
and achieving Best
Value
• The council demonstrates high standards of governance
and sound financial stewardship
• Customers experience high quality and improving council
services
• The workforce has the skills, flexibility and capacity to
deliver the council’s priorities
• Digital and ICT services meet the needs of the council
and its customers 
101

Page 102

102

Page 103

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 20 Dec 15:31
Quarter 2 : April 2022 - September 2022
Finance and Corporate Resources
Resource Plan
(This represents the cumulative position to September 2022)
Performance Report 2022-23
12
103

Page 104

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 20 Dec 15:31
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 0 0 0 0 0
Education and Learning 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 3 0 0 0 3
Delivering the plan and achieving best value 13 1 0 0 14
Total 16 1 0 0 17
Page 1
104

Page 105

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
Our Economy
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrive.
Performance Indicators Comments/ Progress Status Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of unemployed people supported
via council-operated employability
programmes
The results to the end of Quarter 2 are on target Green 1,200 867 1,322 1,348 1,934
Number of unemployed people gaining
sustainable employment
The results to the end of Quarter 2 are on target Green 600 326 713 410 1,146
Number of unemployed people accessing
further education or training
As at Quarter 2 we have 214 people progressing in further education
and training.  We have exceeded our annual target
Green 200
people
214
people
568 people 211 people 219 people
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Performance Indicators Comments/ Progress Status Target To Date
-------- Last 3 Years ------------------- This Year -----------
Pay invoices within the target of 28 days Target exceeded. Green 90.0% 92.0% 89.0% 90.9% 93.4%
Percentage of income due from Council
Tax received by the end of the year - in
year (incl water)
The annual Council Tax collection target for 2022-23 has been set at
95.5%.  At Quarter 2, Council Tax collection is currently 63.53%, ahead
of target by 0.03% and ahead of comparable performance in 2021-22 by
3.59%.
Green 95.50% 63.53% 95.36% 94.89% 95.54%
% of Non Domestic rates income achieved Non Domestic rates collection is currently 53.6%, ahead of the Q2 target
by 0.1%.
Green 97.5% 53.6% 98.6% 96.8% 97.5%
Sundry Income collection To date, a collection rate of 97.9% has been achieved, 0.9% ahead of
target.
Green 97.0% 97.9% 98.0% 97.8% 98.1%
Liquor licensing processing target - 97%
within service targets
Target has been achieved. Green 97.0% 97.0% 99.0% 100.0% 92.0%
Registration processing target - 97% within
service targets
Target has been achieved. Green 97.0% 100.0% 99.0% 100.0% 93.0%
Citizenship processing target - 97%  within
service targets
Target has been achieved. Green 97.0% 100.0% 100.0% 100.0% 100.0%
Complaints processing target - 97% within
service targets
Target has been achieved. Green 97.0% 100.0% 100.0% 100.0% 100.0%
Page 2
105

Page 106

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 20 December 2022
Resource Plan Performance Indicators Finance and Corporate Resources -
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status Target To Date
-------- Last 3 Years ------------------- This Year -----------
Customer Service Centre - % of calls
answered
Target exceeded - at Q2, 95% of all calls answered against a target of
90%.
Green 90.00% 95.00% 91.00% 92.00% 93.00%
Customer Service Centre – average queue
time
Slight slippage against target. Currently sitting at 153 seconds. Target is
120 seconds. Continue to work to ensure target is met.
Amber 120 153 94 93 158
Benefits administration – average
processing times for new Housing Benefit
and Council Tax Reduction claims
Processing times for new claims is currently 13 days, 1 day under target
with annual target of 14 days expected to be achieved.
Green 14 days 13 days 15 days 13 days 13 days
Housing Benefit and Council Tax
Reduction – accuracy of processing
Accuracy performance is currently 96.1%, exceeding the target. Green 93.5% 96.1% 94.4% 92.6% 94.4%
Scottish Welfare Fund – average
processing times for Crisis Grants
Processing times for Crisis Grants is currently equal to target. Green 2 days 2 days 2 days 2 days 2 days
Scottish Welfare Fund – average
processing times for Community Care
grants
Processing times for Community Care Grants is currently equal to target. Green 15 days 15 days 14 days 12 days 16 days
Page 3
106

Page 107

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 0 3 0 0 0 3
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0 0
Children and Young People 0 0 0 0 0 0
Housing and Land 0 0 0 0 0 0
Our Economy 0 7 0 0 0 7
Delivering the plan and achieving best value 2 13 0 1 3 19
Total 2 23 0 1 3 29
Page 4
107

Page 108

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
Communities and Environment
Individuals and communities in South Lanarkshire are engaged and able to participate in decision-making processes
Action Measures Comments/ Progress Status
Increase routes for
communities to
participate in decision
Monitor and develop the bespoke locality planning
partnership in each of the four localities
Two partnerships established, chairs in place and chairs have joined
the CPP Board. Two partnerships in development, and dialogue
happening with the groups who will be invited to join them.
Green
making and priority
setting
Develop a comprehensive set of neighbourhood planning
structures across all identified priority communities in South
Lanarkshire
Stakeholder groups in place in all communities with current
neighhourhood plans.
Green
Support communities and Resources in the roll out of a 1%
mainstream participatory budgeting process
Support given to resources for PB in roads and street cleaning
services. Support given to communities to engage.
Green
Our Economy
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrive.
Action Measures Comments/ Progress Status
Progress the Community
Wealth Building (CWB)
strategy for South
Lanarkshire
Implement a programme of development sessions for the
CWB Commission to widen the scope of the strategy by
March 2023
At the CWB Commission on 6 September an input from CLES/Scottish
Government provided an opportunity for a wide-ranging discussion of
CWB both in the UK and elsewhere, which will feed into the further
development of the strategy in South Lanarkshire.  Further sessions
will be held later in the year.
Green
Establish a monitoring and reporting framework for the CWB
action plan by the end of April 2022
The monitoring and reporting framework is in place and the action plan
has been reported to the Commission at Q2 and Q4 2021-22.  The
refreshed action plan for 2022-23 will be reported to the Commission
at similar points in the year 2022-23.
Green
Page 5
108

Page 109

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
Our Economy
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrive.
Action Measures Comments/ Progress Status
Deliver effective
Employability Services
to support Economic
Recovery
Deliver the Young Persons Guarantee Programme. A
guarantee to young people aged 16-24 to support and
progress them into fair work opportunities, training or further
education and volunteering
We continue to deliver support to young people aged 16-24 with Key
Workers supporting them on their journey towards sustainable work.
The young people engaged having multiple barriers to employment
and require longer intensive employability support
Green
Kickstart Programme – support DWP flag ship programme
as the largest employer in the area providing fair work
opportunities for 50 young people to work within the council
in various occupations
South Lanarkshire Council won an employer award for this UK govt
funded programme. Of the Kickstart trainees who started, 19 have
been successful in securing either a longer term or permanent post
within the Council before their Kickstart opportunity came to an end. 1
trainee secured a similar role with a different employer, and 4 have
exited the programme upon completion to pursue opportunities
elsewhere.   We currently have 19 trainees still on their Kickstart
journey and we expect to see the majority of them progressing into
Council jobs.
Green
Support Modern Apprentices to enter fair work opportunities
within the Council ranging from care, admin and craft
occupations
We support a range of MA's in Care, Digital/IT, Construction and
Business Administration. The programme is on target with 32 starts to
date
Green
Deliver targeted recruitment programmes to support the local
jobs market addressing skills shortages such as HGV
Drivers, Personal Carers, Customer Service etc
We currently have 12 trainees progressing through HGV training and
tests including wraparound employability support and will be extending
the scope to support PCV opportunities.
Green
Deliver targeted employer recruitment incentives to support
those aged 25 plus enter and sustain fair work opportunities
and support parents and families with complex barriers to
employment
The employer engagement function continues to support businesses
with recruitment incentives to support clients with multiple barriers to
employment and help parents and families most in need. A dedicated
Money Matters member of staff is now providing in work better off
financial support and advice  including helping the most vulnerable
families within our communities as the cost-of-living crisis looms, rising
interest rates and energy and food bills remain stuck at historic highs
Green
Page 6
109

Page 110

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Action Measures Comments/ Progress Status
Lead financial planning
and reporting for the
council
Financial Strategy to be agreed by June 2022 The Council's Revenue Budget Strategy for 2023/2024 was approved
by Council on 15 June 2022.  An update was approved by the
Executive Committee in September 2022, with further updates to be
provided as required.
Green
Budget proposals to be considered by members by
December 2022
A recent Budget update was approved by Executive Committee in
September 2022 and a further update will be provided before the end
of the calendar year.
Report Later
Budget agreed by March 2023 Work is ongoing with a view to setting a Budget by the end of the
financial year.
Report Later
Capital programme for 2023-24 to be agreed by March 2023 Work is ongoing to set a capital programme for 2023/2024. Report Later
Compliance with internal
audit standards
Undertake an external assessment of Internal Audit to
provide assurance that the function continues to operate in
compliance with the Public Sector Internal Audit Standards
PSIAS external assessment is due to commence in Quarter 3 of
2022/2023 with a report on outcomes to CMT and RASC by 31 March
2023.
Green
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Monitor the progress of
transformation projects
through reporting
framework to CMT
Evidence of reporting of progress to CMT across all
transformation projects
CMT Efficiency meetings are held regularly and transformation project
progress reported at each meeting.
Green
Deliver more convenient
and accessible forms of
customer contact
Increase the availability and use of online forms and
streamline customer contact processes
An ongoing programme of work to review and develop Transactions
online forms and improve web content, has increased customer
access to self-service options.
Changes to 3 B&R telephony menu structures are being piloted.  The
aim is to promote self service by directing callers to the website and
online forms for specific enquiry types.
Green
Page 7
110

Page 111

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
New digital contact methods will be explored to improve
contact channels
The use of 'real-time' SMS within Transactions has been implemented
within the Benefits & Council Tax Call Centre and is being rolled out to
other teams ie NDR, CSC.  This enables call handlers to issue links to
online forms/web content to callers to promote customer self service
for enquiries such as applying for Benefits/discounts and registering
for myaccount.
Green
Relaunch myaccount to promote customer self-service
options for a range of Council Tax activity such as viewing
account balance, making payments, and applying for
discounts and exemptions
Promotional activity for myaccount Council Tax via SMS, Social Media
and web content has resulted in an average of 500 new registrations
per month. Further promotion via Social Media is planned quarterly
throughout 22/23.
Green
Lead on the renewal of
strategic planning and
Finalise the new Community Partnership Plan (CPP) by June
2022
Plan published June 2022. Complete
work to further align the
Council Plan with the
Promote the new CPP plan across South Lanarkshire
throughout 2022
Comms plan agreed and launch of plan arranged. Green
Community Plan Develop a comprehensive monitoring process for CPP
actions
Work under way using the Sustainable Development Goals as a
framework.
Green
Submit new Council Plan for approval by July 2022 The new Council Plan 2022-27 was approved by the council at its
meeting on 15 June 2022.
Complete
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Take forward IT strategic
developments
Migrate to new Integrated Housing and Property
Management system by November 2022
Due to COVID and other technical reasons, the project has
experienced delays and is to be rescheduled for implementation in
October 2023
Red
Implement approved actions from Year 3 of the SLC Digital
Inclusion Strategy to support most deprived citizens to
access benefits of being online
On course to achieve Green
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements
On course to achieve Green
Develop and deliver training plan to upskill IT staff in new
technologies
On course to achieve Green
Page 8
111

Page 112

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 20 December 2022
Resource Plan actions and measures Finance and Corporate Resources -
Delivering the plan and achieving best value
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Complete first phase of migration to Oracle Cloud Fusion
system by February 2023
On course to achieve Green
The workforce has the skills, flexibility and capacity to deliver the council's Priorities
Action Measures Comments/ Progress Status
Adjust the Council
Workforce Plan to
match the changed
environment
Resource Workforce Plans updated taking account recovery
from COVID and set out requirements moving forward.
These will be used to configure the Council Workforce Plan
and will reported to Committees by September 2022
Workforce Plans as described have been presented to committee. Green
Page 9
112