Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 11 November 2025 
Dear Councillor 
Finance and Corporate Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 19 November 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Lesley McDonald (Chair), Walter Brogan (Depute Chair), Celine Handibode (Depute Chair), Joe
Fagan (ex officio), Alex Allison, Mathew Buchanan, Andy Carmichael, Maureen Chalmers, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Mary Donnelly, Grant Ferguson, Gladys Ferguson-Miller,
Graeme Horne, Martin Hose, Ross Lambie, Katy Loudon, Hugh Macdonald, Catherine McClymont,
Elaine McDougall, Mark McGeever, Mo Razzaq, John Ross, Graham Scott, Kirsty Williams 
Substitutes
Archie Buchanan, Poppy Corbett, Colin Dewar, Ross Gowland, Gavin Keatt, Susan Kerr, Martin
Lennon, Richard Lockhart, Richard Nelson, Carol Nugent, Norman Rae, Helen Toner, David
Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Finance and Corporate Resources Committee
held on 10 September 2025 submitted for approval as a correct record.  (Copy
attached) 
5 - 16 
3 Minutes of Grievance and Disputes Panel
Minutes of the meeting of the Grievance and Disputes Panel held on 22 October
2025 submitted for approval as a correct record.  (Copy attached) 
17 - 18 
Monitoring Item(s) 
4 Finance and Corporate Resources - Revenue Budget Monitoring 2025/2026
Report dated 22 October 2025 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
19 - 30 
5 Finance and Corporate Resources - Capital Budget Monitoring 2025/2026
Report dated 5 November 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
31 - 34 
6 Finance and Corporate Resources – Workforce Monitoring – 1 July to 30
September 2025
Report dated 8 October 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
35 - 40 
7 Council-wide Workforce Monitoring - 1 July to 30 September 2025
Report dated 8 October 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
41 - 60 
8 Finance and Corporate Resource Plan - Quarter 2 Progress Report
2025/2026
Report dated 21 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
61 - 78 
9 Treasury Management Activity - 2025/2026 Second Quarter Review
Report dated 11 November 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
79 - 86 
Item(s) for Decision 
10  Revenue Collection and Approval for Write Offs
Report dated 28 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
87 - 92 
11  Procurement Service – Establishment Posts
Report dated 10 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
93 - 96 
12  Consultation on Changes to the Local Government Pension Scheme
(Scotland) Regulations 2018
Report dated 29 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
97 - 106
2

Page 3

13  Common Good Update Report – Former Vogue Building
Report dated 5 November 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
107 - 110 
Item(s) for Noting 
14  Early Retirement, Voluntary Severance and Switch 2
Report dated 22 September 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
111 - 116 
15  Statutory Review of Community Council Scheme of Establishment
Report dated 15 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
117 - 122 
16  Response to Electoral Commission Consultation on Updated Guidance for
Returning Officers Assistance with Voting for Disabled People
Report dated 23 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
123 - 132 
17  Freedom of Information Reform (Scotland) Bill:  Call for Views
Report dated 21 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
133 - 144 
18  Annual Procurement Report – 2024/2025
Report dated 28 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
145 - 212 
19  Finance and Corporate Resources' Risk Register and Risk Control Plan
Report dated 22 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
213 - 228 
20  Notification of Contracts Awarded - 1 April to 30 September 2025
Report dated 20 October 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
229 - 234 
Urgent Business 
21  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

FINANCE AND CORPORATE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 10 September 2025 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Alex Allison, Councillor Walter Brogan (Depute), Councillor Mathew Buchanan, Councillor
Andy Carmichael, Councillor Andrea Cowan, Councillor Maureen Devlin, Councillor Colin Dewar
(substitute for Councillor Maureen Chalmers), Councillor Mary Donnelly, Councillor Grant Ferguson,
Councillor Celine Handibode, Councillor Graeme Horne, Councillor Katy Loudon, Councillor Hugh
Macdonald, Councillor Elaine McDougall, Councillor Mark McGeever, Councillor John Ross,
Councillor Graham Scott, Councillor Helen Toner (substitute for Councillor Gladys Ferguson-Miller),
Councillor Kirsty Williams 
Councillors' Apologies:
Councillor Maureen Chalmers, Councillor Margaret Cooper, Councillor Joe Fagan (ex officio),
Councillor Gladys Ferguson-Miller, Councillor Martin Hose, Councillor Ross Lambie, Councillor
Catherine McClymont, Councillor Mo Razzaq 
Chief Executive’s Service
J Davitt, Communications Adviser
Finance and Corporate Resources
J Taylor, Executive Director; C Fergusson, Head of Finance (Transactions); M Husband, Head of IT
Services; S Jessup, Administration Assistant; C Lyon, Administration Officer; M Milne, Head of
Personnel Services; L O’Hagan, Head of Finance (Strategy); I Strachan, Head of Administration and
Legal Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Finance and Corporate Resources Committee held on 11 June
2025 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Finance and Corporate Resources – Revenue Budget Monitoring 2024/2025
A report dated 12 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted comparing the actual expenditure for the period 1 April 2024 to 31 March 2025 against
budgeted expenditure for 2024/2025 for Finance and Corporate Resources. 
As at 31 March 2025, the actual outturn position was an underspend of £2.092 million before
transfers to reserves.  The underspend was mainly due to additional funding provided for the
Scottish Welfare Fund.  Due to the timing of the funding being awarded, the majority of this had
been carried forward for use in the next financial year.  In addition, there were underspends from
vacant posts across the Services, on the Empty Property Relief (EPR) budget and on the Grants
budget that had been carried forward to support the 2025/2026 saving.  
2
5

Page 6

The position after approved transfers to reserves was a breakeven position, as detailed in
Appendix A to the report.  This position had been reported and approved as part of the overall
Council final position for 2024/2025, as reported to the Executive Committee on 25 June 2025. 
Virements were proposed to realign budgets across budget categories and with other Resources,
and those movements were detailed in the appendices to the report. 
The Committee decided: 
(1) that the position as at 31 March 2025 of a breakeven position after approved transfers to
reserves, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference:  Minutes of 26 March 2025 (Paragraph 4) and Minutes of the Executive Committee
of 25 June 2025 (Paragraph 3)] 
4 Finance and Corporate Resources – Revenue Budget Monitoring 2025/2026
A report dated 12 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted comparing the actual expenditure for the period 1 April to 11 July 2025 and providing a
forecast for the year to 31 March 2026 for Finance and Corporate Resources. 
A Service Analysis Statement, which outlined the key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided at Appendix B to the report. 
As at 11 July 2025, the projected outturn position for the Resource was a breakeven position. 
Virements were proposed to realign budgets and those movements were detailed in the
appendices to the report. 
The Committee decided: 
(1) that the forecast to 31 March 2026 of a breakeven position, as detailed in Appendix B of the
report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
5 Finance and Corporate Resources – Capital Budget Monitoring 2024/2025
A report dated 11 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted advising of progress on Finance and Corporate Resources’ capital programme for
2024/2025 and summarising the expenditure at 31 March 2025. 
The budget for 2024/2025 was £3.086 million.  Total expenditure to 31 March 2025 as £3.790
million. 
The final outturn position of £3.790 million was an overspend of £0.704 million in comparison to
the programme of £3.086 million.  The overspend reflected additional funded spend on IT
infrastructure projects (spend and funding transferred from Revenue).  An update on the
2025/2026 programme was detailed in a separate report to this Committee.  
6

Page 7

The Committee decided: that the Finance and Corporate Resources’ capital
programme of £3.086 million, and expenditure for the year
of £3.790 million, be noted. 
[Reference: Minutes of 26 March 2025 (Paragraph 5) and Minutes of the Executive Committee
of 25 June 2025 (Paragraph 5)] 
6 Finance and Corporate Resources – Capital Budget Monitoring 2025/2026
A report dated 11 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted advising of progress on Finance and Corporate Resources’ capital programme for
2025/2026 and summarising the expenditure position at 11 July 2025. 
The revised capital programme for 2025/2026 was £0.545 million, as approved by the Executive
Committee on 25 June 2025. 
The forecast for the financial year was £0.545 million and spend to date was £0.028 million. 
The Committee decided: that the Finance and Corporate Resources’ capital
programme of £0.545 million, and expenditure to date of
£0.028 million, be noted. 
[Reference: Minutes of South Lanarkshire Council (Special) of 26 February 2025 (Paragraph 3)
and Minutes of the Executive Committee of 25 June (Paragraph 6)] 
7 Finance and Corporate Resources - Workforce Monitoring – April to June 2025
A report dated 4 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the following employee information for Finance and Corporate Resources for the
period 1 April to 30 June 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 14 June 2025 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 11 June 2025 (Paragraph 5)] 
8 Council-wide Workforce Monitoring – April to June 2025 
A report dated 4 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the following Council-wide employee information for the period 1 April to 30 June
2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews 
7

Page 8

 recruitment monitoring
 staffing watch as at 14 June 2025 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 11 June 2025 (Paragraph 6)] 
9 Treasury Management Activity – 2025/2026 First Quarter Review 
A report dated 13 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the first quarter review of Treasury Management activity for 2025/2026. 
Details were given on:- 
 market performance  management of risk
 debt management and borrowing strategy  next quarter investment plans
 investment activity  treasury management indicators 
Officers responded to a member’s question on the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of South Lanarkshire Council (Special) of 26 February 2025 (Paragraph 4)] 
Councillor Carmichael, having experienced technical issues, joined the meeting during consideration
of the above item of business 
10 Finance and Corporate Resources’ Workforce Plan 2025 to 2027 
A report dated 5 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on Finance and Corporate Resources’ Workforce Plan. 
The Council’s Workforce Strategy and Plans were aligned to current and future Council service
needs and detailed the approach by the Council to ensure that the workforce required was in place
to meet those needs.  The Council Workforce Strategy and Plan was approved by the Executive
Committee on 28 May 2025. 
The draft Finance and Corporate Resources’ Workforce Plan was attached as Appendix 1 to the
report.  The workforce planning process identified 5 key priority areas, each with associated
challenges and actions, as detailed in paragraphs 5.2 to 5.6 of the report. 
Workforce Plans would be monitored through Resource Management Teams and updates
provided to Committee annually. 
The Committee decided: 
[ (1) that the work to produce the Finance and Corporate Resources’ Workforce Plan be noted;
and 
(2) that the Finance and Corporate Resources’ Workforce Plan 2025 to 2027, attached as
Appendix 1 to the report, be approved. 
[Reference:  Minutes of the Executive Committee of 28 May 2025 (Paragraph 7)]  
8

Page 9

11 Learning and Development Strategy 2025 to 2027 
A report dated 7 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on the Learning and Development Strategy for 2025 to 2027. 
Work to refresh  the Learning and Development Strategy had commenced in 2019, however, the
impacts of COVID-19 on learning and development had been significant as the service had to
adapt at pace to develop and enhance eLearning and other digital learning and development
interventions. 
The Learning and Development Service had continued to prioritise digital learning and had
reviewed the current learning and development plan as part of the development of the new
Learning and Development Strategy.  The Strategy would align with the key Council strategies
and plans, including the objectives set out in the Council Plan 2022 to 2027; the Workforce
Strategy 2025 to 2027; the Council’s Digital Strategy 2022 to 2027 and Sustainable Development
and Climate Change Strategy 2024 to 2027. 
A review exercise had taken place between January and March 2025 and included an analysis of
the internal learning and development policy documents and the work of the Learning and
Development Workforce Planning Boards, together with the external documents detailed in
paragraph 3.3. 
A review had also commenced on the management and leadership development activities across
the Council.  Aa terms of reference had been created and changes were planned to be
implemented by December 2025. 
The Strategy set out the overarching vision for learning and development across the Council and
introduced 6 strategic priorities that were proposed to be delivered during the life of the Strategy
from 2025 to 2027 as follows:- 
 governance  mandatory training
 digital learning  vocational development
 management and leadership development  grow our own 
The priorities were detailed in full at section 6 of the Strategy and had been identified from
research into the aims, objectives and actions set out in key Council strategies and plans that had
connections with learning and development.  The Strategy was attached as Appendix 1 to the
report. 
The Committee decided: that the Learning and Development Strategy 2025 to 2027,
attached at Appendix 1 of the report, be approved. 
12 Prudential Indicators, Treasury Management Activity and Annual Investment
Report 2024/2025 
A report dated 20 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the:- 
 Treasury Management Activity and Prudential Code indicators for 2024/2025
 proposed Annual Investment Report for 2024/2025 
The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of Practice for Treasury
Management required the Council to prepare an annual report on its Treasury Management
activities.  The CIPFA Prudential Code required councils to prepare a series of financial indicators
that demonstrated affordability, prudence and sustainability with regard to capital financing
decisions. 
9

Page 10

The Council’s Capital Programme included, within its funding package, planned borrowing.  The
Prudential Code provided a framework to assist the management of the financial implications and
helped to demonstrate that borrowing was both affordable and prudent. 
The Council’s Treasury Management Activity Report for 2024/2025 and the Treasury
Management and Prudential Code Indicators for 2024/2025 were attached as appendices 1 and
2, respectively, to the report. 
In terms of the Local Government Investments (Scotland) Regulations 2010, the Council was
required to prepare an Annual Investment Strategy prior to the start of each financial year and an
Annual Investment Report after the financial year end.  Both documents required to be approved
by the Council. 
The Annual Investment Strategy for 2024/2025 had covered the following areas:- 
 permitted investments
 risk management
 borrowing in advance 
The Annual Investment Report, attached as Appendix 3 to the report, detailed the Council’s
activity in each of those 3 areas for 2024/2025 and Appendix 4 detailed the permitted investments
that the Council had approved for the financial year 2024/2025. 
No borrowing in advance was taken during 2024/2025. 
The Committee decided: 
(1) that the Treasury Management Activity Report for 2024/2025 and the 2024/2025 Treasury
Management and Prudential Code Indicators be noted and referred to the Executive
Committee for noting; and 
(2) that the 2024/2025 Annual Investment Report be endorsed and referred to the Executive
Committee for endorsement prior to submission to the Council for formal approval in line
with The Local Government Investments (Scotland) Regulations 2010. 
13 Revenue Collection and Approval for Write-Offs 
A report dated 20 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 collection performance for the financial year 2025/2026 to 31 July 2025 on revenue income
which comprised Council Tax, non-domestic rates (NDR), sundry debts and arrears
 performance in the Non Domestic Rates Incentivisation Scheme (NDRIS)
 the write-off of irrecoverable Council Tax, non-domestic rates, Business Improvement
District (BID) levy, sundry debt and Housing Rent and associated charges 
Details were provided on current collection targets.  The Council was ahead of both target and
comparable performance from 2024/2025 in respect of Council Tax.  In respect of sundry debt,
the Council was behind both target and comparable performance from 2024/2025. 
In terms of arrears collection targets, the Council was ahead of target but behind comparable
performance from 2024/2025 in respect of Council Tax.  In respect of non-domestic rates, the
Council was ahead of both target and comparable performance from 2024/2025.  In respect of
sundry debt, the Council was equal to target and ahead of comparable performance from
2024/2025.  
10

Page 11

The Non Domestic Rates Incentivisation Scheme (NDRIS), formerly known as the Business Rates
Incentivisation Scheme (BRIS), was a Scottish Government initiative to incentivise growth of the
local business tax base, with a view to increasing NDR income yields. 
The Scottish Government set annual targets for growth (buoyancy) and councils which achieved
their target retained 50% of the additional income generated above the target.  The provisional
annual buoyancy target for South Lanarkshire Council in 2025/2026 had been set by the Scottish
Government at 0.9%. 
Buoyancy to the end of June 2025 was 0.04%.  The tax base must achieve growth of more than
0.86% during the remaining 3 quarters of the financial year to secure additional income under the
scheme. 
It was proposed that the following debts be written off:- 
 irrecoverable Council Tax accounts from 1993/1994 to 2025/2026 (including bulk write-off
for 2002/2003) to the value of £1,753,617.19 relating primarily to prescribed debt,
sequestrations and estates of the deceased
 irrecoverable non-domestic rates from 2023/2024 to 2025/2026 to the value of £582,799.00
relating primarily to debtors in liquidation, those who had ceased trading or had been
sequestrated
 BID levies totalling £1,583.87 administered by the Council on behalf of Hamilton, Carluke
and Lanark BID companies
 sundry debts to a value of £1,606,030.01
 former tenant rent arrears totalling £385,884.19 (including bulk write offs for 2025/2026 Q1
for temporary accommodation) and housing benefit overpayments of £16,219.90 
The Committee decided: 
(1) that the Council’s performance in the collection of revenues be noted; 
(2) that the current position in respect of the Non Domestic Rates Incentivisation Scheme be
noted; and 
(3) that the write-off of the following irrecoverable debts be approved:-
 Council Tax debt from 1993/1994 to 2025/2026 to the value of £1,753,617.19
 Non Domestic Rates from 2023/2024 to 2025/2026 totalling of £582,799.00
 BID levies totalling £1,583.87
 sundry debts to a value of £1,606,030.01
 house rent and associated charges totalling £402,104.09 
[Reference:  Minutes of 11 June 2025 (Paragraph 9)] 
14 Short Term Lets Licence Fees for New Application Types 
A report dated 4 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the fee structure in respect of new Short Term Lets application types. 
On 2 November 2022, the Executive Committee approved the Council’s Short Term Lets Policy,
in implementation of the Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets)
Order 2022, which introduced the Short Term Lets licensing regime.  
11

Page 12

On 24 August 2024, the Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets)
Amendment Order 2024 was enacted to include the following licence application types in the Short
Term Lets licensing regime, along with other minor technical changes:- 
 Provisional Short Term Let Licence
 Confirmation of Provisional Short Term Let Licence
 Transfer of Short Term Let Licence 
Minor changes to the Council’s Short Term Lets Policy to include the new application types were
approved by the Licensing Committee on 24 June 2025, and the proposed fee structure for the
new application types was endorsed. 
The new fee structure was detailed in paragraph 4.2 of the report and reflected fees charged by
the Council in respect of similar application types within the Licensing (Scotland) Act 2005 and
other licensing fees within South Lanarkshire.  Going forward, the fees would be reviewed as part
of the annual review of fees and charges that took place at the time of the Council’s annual budget
setting. 
A report would be submitted to the Executive Committee later this year with any further changes
proposed to the Policy following the 3 yearly review.  A public consultation on the existing Policy,
and any proposed changes, would be carried out as part of this review. 
The Committee decided: that the fees for the new Short Term Lets application types,
as detailed in paragraph 4.2 of the report, be approved. 
[Reference:  Minutes of the Licensing Committee held on 24 June 2025 (Paragraph 3)] 
15 Reserves Strategy
A report dated 14 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the Council’s Reserves Strategy. 
A Reserves Strategy had been presented to this Committee at its meeting on 30 October 2024
and detailed the Council's Reserves, as at 31 March 2024. 
A report to the Executive Committee on 25 June 2025 on the 2026/2027 to 2027/2028 Revenue
Budget Strategy, noted that an annual review would be undertaken to consider the monies held
in the Earmarked/Committed General Fund Reserve, alongside the Council’s Revenue Budget
Strategy. 
Details of the Council’s Reserves and their balance at the end of 2024/2025 were provided in
Section 4 of the report. 
Information on the Council’s Reserves, their purpose and their link to the Budget Strategy, was
provided in Section 5 of the report and Section 6 of the report outlined the profiled use of Reserves
across the coming years. 
The Council’s Reserves at the end of 2024/2025, and a profile of anticipated use across the
coming years, was detailed in Appendix 1 of the report.  The main movements reflected the use
of Reserves in the Council’s Revenue Budget Strategy, relating to the use of Reserves established
following the implementation of the Service Concession arrangements and from the reduced
pension contributions. 
The table in Appendix 1 showed that all Reserves were committed, except the
Unearmarked/Uncommitted General Fund balance of £13.043 million.  
12

Page 13

The Committee decided: 
[ (1) that the detail on the Reserves and their balance at the end of 2024/2025, as detailed in
Section 4 of the report, be noted; 
(2) that the Strategy proposed for each Reserve, as detailed in Section 5 of the report, be noted;
and 
(3) that the planned use of Reserves across the coming years, as detailed in Section 6 and
Appendix 1 of the report, be noted. 
[Reference:  Minutes of 30 October 2024 (Paragraph 11) and Minutes of the Executive Committee
of 25 June 2025 (Paragraph 8)] 
16 Common Good Update Report 
A report dated 15 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on 
 the Common Good Accounts for the year ended 31 March 2025
 the cyclical spend committed against the Common Good repairs and maintenance budgets
for Lanark and Hamilton
 requests for funding from Lanark Common Good that could not be met from the repairs and
maintenance budgets 
The Common Good funds held within South Lanarkshire Council were Lanark, Biggar, Hamilton
and Rutherglen.  Accounts were prepared on an annual basis, as part of the Council’s year end
process.  The position for the year was detailed in Section 4 of the report and the unaudited
accounts attached at Appendix 1 to the report. 
The Common Good accounts in Lanark and Hamilton held a number of properties.  On 2 October
2013, this Committee had approved an annual cyclical maintenance plan of £15,000 for both
Lanark and Hamilton Common good properties.  If inspections highlighted requirements to
undertake investment which would be beyond routine maintenance, this would be considered
separately for approval and would be the subject of a report to this Committee. 
Cyclical spend committed against the Common Good repairs and maintenance budgets for Lanark
and Hamilton was detailed in Sections 5 and 6 of the report. 
A number of requests for funding had been received for Lanark Common Good and Hamilton
Common Good that were either not for repairs and maintenance or which could not be approved
under delegated authority due to the expected costs, and those were detailed in Sections 7 and
8 the report respectively. 
The Committee decided:
cs]
(1) that the accounts for Common Good for the year ended 31 March 2025 be noted; 
(2) that the cyclical spend committed against the Common Good repairs and maintenance
budgets for Lanark and Hamilton be noted; 
(3) that previously approved projects that would require funding from Lanark Common Good that
could not be met from the repairs and maintenance budgets be noted; and 
13

Page 14

(4) that future projects that would require funding from Hamilton Common Good that could not
be met from the repairs and maintenance budgets be noted. 
[Reference:  Minutes of 21 August 2024 (Paragraph 15)] 
17 Council Tax Paperless Billing
A report dated 7 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the planned introduction of the option for customer to access paperless Council Tax
billing. 
South Lanarkshire Council had more than 160,000 domestic properties subject to a Council Tax
charge.  Billing took place annually in March of each year, as part of a bulk exercise, to notify all
households of their Council Tax charge and payment terms for the forthcoming year.  Billing also
took place daily throughout the year as new properties became liable for Council Tax and changes
in circumstances were processed for existing properties. 
Currently, all Council Tax bills were printed and enveloped by Adare SEC and posted via Royal
Mail economy post.  Around 160,000 annual bills and 110,000 daily bills were printed and posted
each year.  The costs associated with issuing 160,000 Council Tax bills in March 2025 totalled
£0.128 million and equated to £0.80 per bill. 
The provision of paperless billing would build on the existing MyAccount services already available
to customers who wished to view their Council Tax information online.  Existing services included
updating contact details, setting up a direct debit, change of address, applying/cancelling a single
person discount and viewing the date and value of the last payment. 
The Council currently had over 18,000 registered MyAccount users who could view their Council
Tax bill, however they currently received a paper bill each year. 
Customers who signed up for paperless billing would no longer receive a paper bill and any
changes to their bill after signing up would be notified by email.  Customers could contact the
Council Tax team should they wish to revert to receiving paper bills. 
The intention was to adopt a ‘soft launch’ from October 2025 prior to annual billing in 2026.  Details
on the process for signing up for paperless billing were provided in paragraph 4.6 of the report. 
Savings generated from the implementation of the paperless billing would be dependent on uptake
achieved, 
The Committee decided: that the introduction of optional paperless billing for Council
Tax from October 2025 be noted. 
18 Money Matters Advice Service Annual Report 2024/2025
A report dated 20 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the Money Matters Advice Service (MMAS) Annual Report for 2024/2025. 
MMAS was the Council’s dedicated, free and confidential advice service which supported
residents with welfare right, money and debt advice, energy assistance and crisis intervention.  
14

Page 15

In 2024/2025, the Service operated against the backdrop of:- 
 continued cost of living pressures
 a declared housing emergency in June 2024
 increased demand from residents experiencing financial hardship, housing instability and
fuel poverty 
The MMAS was accredited to Type II and Type III under the Scottish National Standards for
Advice and Information Providers (SNAIP) and demonstrated high quality casework specialist
advice capability.  Standard 2 of SNAIP required all services to regularly review their work against
the aims and objectives for their service and make the results available in a publicly accessible
format at least once a year.  An annual report was considered the most appropriate format to do
this. 
The Annual Report 2024/2025 provided the following information:- 
 key outcomes
 team performance reports
 strategic themes
 client demographics
 customer feedback
 case studies
 outcomes by electoral ward 
The key outcomes of the Annual Report were detailed in Section 5 of the report, with the Annual
Report 2024/2025 attached at Appendix 1 to the report. 
The Annual Report 2024/2025 would be published on the Council’s website. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 21 August 2024 (Paragraph 14)] 
19 Urgent Business 
There were no items of urgent business. 
15

Page 16

16

Page 17

GRIEVANCE AND DISPUTES PANEL 
Minutes of meeting held in Committee Room 2, Council Offices, Almada Street, Hamilton on 22
October 2025 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Margaret Cowie, Councillor Kenny McCreary 
Attending:
Finance and Corporate Resources
L Cunningham, Administration Officer; G Robertson, Personnel Adviser; T Slater, Administration
Adviser 
1 Declaration of Interests 
No interests were declared. 
2 Urgent Business 
There were no items of urgent business. 
3 Exclusion of Press and Public 
The Panel decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the next item of business on the grounds
that it was likely that there would be disclosure of exempt
information in terms of Paragraph 11 of Part I of Schedule
7A of the Act. 
4 Grievance 
The Panel considered a grievance (Ref G/1/25) by UNISON. 
A representative from UNISON was present.  The Council was represented by the Head of
Personnel Services.  All parties were heard in relation to the matter and then withdrew from the
meeting. 
The Panel decided: 
(1) that the grounds of the grievance had not been substantiated and the grievance be not
upheld; and 
(2) to recommend that both parties liaise to ensure that the Collective Agreement and
Matching Process was updated to provide clarification on the issue 
3
17

Page 18

18

Page 19

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 18 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources - Revenue Budget
Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[p
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 5 September 2025 for Finance and Corporate
Resources
 provide a forecast for the year to 31 March 2026
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected breakeven position on the 2025/2026 revenue budget for
Finance and Corporate Resources’, as detailed in Appendix B of the report,
be noted; and
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the second revenue budget monitoring report presented to the Finance and
Corporate Resources Committee for the financial year 2025/2026. 
3.2. The report details the financial position for Finance and Corporate Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendix B provides the detailed financial position with
variance explanations by budget category. 
3.3. This report reflects the actual spend to 5 September 2025 for the Resource budget
and the expected outturn forecast on expenditure and income at this date. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. As at 5 September 2025, the Resource’s projected outturn position for 2025/2026 is
a breakeven position.  This is outlined in Appendix A which outlines the key
projected outturn variances by Service for the Resource. 
5.2. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in Appendices C-I, where
relevant.
4
19

Page 20

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the
risk of overspend, however these are mitigated by additional funds being added to
the budget. 
7.2. The risk is managed through four weekly Budget Monitoring meetings at which any
variance is analysed.  In addition, the new forecasting within FUSION and work with
the Resource and finance teams, ensures early warning for corrective action to be
taken where appropriate. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Finance and Corporate Resources Committee – 10 September 2025 
List of Background Papers
 Financial Ledger and budget monitoring results to 5 September 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel: 01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
20

Page 21

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Strategy 2,177 2,253 (76) (3.49%) 1,475
Transactions 18,020 17,709 311 1.73% 10,154
Audit 363 332 31 8.54% 199
Information Technology 8,012 8,228 (216) (2.70%) 7,747
Communications and Strategy 2,435 2,422 13 0.53% 1,639
Administration, Legal, Licensing and
Registration 4,580 4,539 41 0.90% 2,486
Personnel 6,675 6,779 (104) (1.56%) 3,145
Net Controllable Exp. 42,262 42,262 0 0.00% 26,845 
Service Heading Explanation for significant projected outturn variances
Strategy The projected overspend is due to a lower than budgeted level of turnover anticipated during the
financial year. (Appendix C). 
Transactions  The projected underspend is due to less than budgeted spend on Empty Property Relief (EPR)
anticipated and an over recovery of income reflecting additional commission received from Scottish
Water. (Appendix D). 
Audit  The projected underspend is due to turnover within the Service. (Appendix E).
Information
Technology
The projected overspend is due to a lower than budgeted level of turnover anticipated during the
financial year. In addition, there are greater than budgeted IT subscription, licensing and contract
costs and costs of training. (Appendix F). 
Communications
and Strategy 
No significant projected outturn variances to report. (Appendix G).
Administration,
Legal, Licensing
and Registration
The projected underspend is due to additional one-off licensing income partially offset by a lower than
budgeted level of turnover anticipated during the financial year. (Appendix H). 
Personnel The projected overspend is due to a lower than budgeted level of turnover anticipated during the
financial year and higher than budgeted IT equipment leasing costs. (Appendix I). 
21

Page 22

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Finance & Corporate Resources Summary 
Revised   Projected       
Budget Category Annual Projected  Outturn Over/ % YTD    
Budget Outturn Variance Under Variance Actual Note 
£000 £000 £000   £000             
Employee Costs 35,174 35,605 (431) over (1.23%) 14,812                  
Property Costs 3,855 3,649 206 under 5.34% 610                  
Supplies & Services 8,140 8,278 (138) over (1.70%) 5,814                  
Transport & Plant 33 33 0 - 0.00% 13                  
Administration Costs 8,076 8,123 (47) over (0.58%) 3,401                  
Payments to Other Bodies 3,350 3,364 (14) over (0.42%) 1,829                  
Payments to Contractors 284 302 (18) over (6.34%) 98                  
Transfer Payments 65,925 65,925 0 - 0.00% 20,802                  
Financing Charges 1,416 1,462 (46) over (3.25%) 977                  
Total Controllable Exp. 126,253 126,741 (488) over (0.39%) 48,356                  
Total Controllable Inc. (83,991) (84,479) 488 - (0.58%) (21,511)                  
Net Controllable Exp. 42,262 42,262 0 - 0.00% 26,845   
Variance Explanations
Variance explanations are shown in Appendices C to I as appropriate. 
Budget Virements
Budget Virements are noted in Appendices C to I as appropriate. 
22

Page 23

Appendix C 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Finance – Strategy Services 
Revised   Projected        
Budget Category Annual Projected  Outturn Over/ % YTD   
Budget Outturn Variance Under Variance Actual   
£000 £000 £000    £000 Note               
Employee Costs 3,019 3,093 (74) over (2.45%) 1,336 1, a,
b               
Property Costs 0 0 0 - 0.00% 0                 
Supplies & Services 15 15 0 - 0.00% 3                 
Transport & Plant 0 0 0 - 0.00% 0                 
Administration Costs 115 122 (7) over (6.09%) 8 
Payments to Other Bodies 665 677 (12) over (1.80%) 122 
Payments to Contractors 23 23 0 - 0.00% 16                 
Transfer Payments 0 0 0 - 0.00% 0                 
Financing Charges 20 20 0 - 0.00% 0                 
Total Controllable Exp. 3,857 3,950 (93) over (2.41%) 1,485                 
Total Controllable Inc. (1,680) (1,697) 17 under (1.01%) (10) 
Net Controllable Exp. 2,177 2,253 (76) over (3.49%) 1,475   
Variance Explanations
1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year.        
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.054m: Employee Costs £0.054m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.108m: Employee Costs £0.108m. 
23

Page 24

Appendix D 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Finance – Transactions Services 
Revised   Projected      
Budget Category Annual Projected  Outturn Over/ % YTD   
Budget Outturn Variance Under Variance Actual  Note 
£000 £000 £000   £000 
Employee Costs 12,982 13,013 (31) over (0.24%) 5,419 a, b              
Property Costs 3,710 3,504 206 under 5.55% 594 1              
Supplies & Services 776 821 (45) over (5.80%) 606 
Transport & Plant 4 4 0 - 0.00% 0 
Administration Costs 1,236 1,276 (40) over (3.24%) 684 
Payments to Other Bodies 1,504 1,504 0 - 0.00% 865 
Payments to Contractors 261 279 (18) over (6.90%) 82 
Transfer Payments 65,925 65,925 0 - 0.00% 20,802 
Financing Charges 105 105 0 - 0.00% 0 
Total Controllable Exp. 86,503 86,431 72 under 0.08% 29,052 
Total Controllable Inc. (68,483) (68,722) 239 under (0.35%) (18,898) 2              
Net Controllable Exp. 18,020 17,709 311 under 1.73% 10,154   
Variance Explanations
1. The projected underspend reflects less than budgeted spend on the Empty Property Relief (EPR) budget.
2. The projected over recovery of income reflects additional commission received from Scottish Water for the collection
of water and sewage. 
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.489m: Employee Costs £0.489m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.192m: Employee Costs £0.192m. 
24

Page 25

Appendix E 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Audit Services 
Revised   Projected        
Budget Category Annual Projected  Outturn Over/ % YTD 
Budget Outturn Variance Under Variance Actual Note 
£000 £000 £000   £000 
Employee Costs 513 480 33 under 6.43% 199 1, a,
b              
Property Costs 0 0 0 - 0.00% 0 
Supplies & Services 6 6 0 - 0.00% 0 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 7 7 0 - 0.00% 0 
Payments to Other Bodies 0 2 (2) over 0.00% 2 
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 4 4 0 - 0.00% 0 
Total Controllable Exp. 530 499 31 under 5.85% 201 
Total Controllable Inc. (167) (167) 0 - 0.00% (2) 
Net Controllable Exp. 363 332 31 under 8.54% 199 
Variance Explanations
1. The projected underspend is due to the level of turnover being experienced during the year. 
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.018m: Employee Costs £0.018m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.007m: Employee Costs £0.007m. 
25

Page 26

Appendix F 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Information Technology Services 
Revised   Projected       
Budget Category Annual Projected  Outturn Over/ % YTD   
Budget Outturn Variance Under Variance Actual Note 
£000 £000 £000    £000                              
Employee Costs 5,579 5,705 (126) over (2.26%) 2,370 1, a,
b
Property Costs 0 0 0 - 0.00% 0                 
Supplies & Services 6,429 6,484 (55) over (0.86%) 4,804 2               
Transport & Plant 4 4 0 - 0.00% 1                 
Administration Costs 1,591 1,626 (35) over (2.20%) 547 3 
Payments to Other Bodies 0 0 0 - 0.00% 0                 
Payments to Contractors 0 0 0 - 0.00% 0                 
Transfer Payments 0 0 0 - 0.00% 0                 
Financing Charges 835 835 0 - 0.00% 792                
Total Controllable Exp. 14,438 14,654 (216) over (1.50%) 8,514                 
Total Controllable Inc. (6,426) (6,426) 0 - 0.00% (767)                
Net Controllable Exp. 8,012 8,228 (216) over (2.70%) 7,747   
Variance Explanations
1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year.
2. The projected overspend is due to greater than budgeted IT subscription, licensing and contract costs.
3. The projected overspend is due to planned additional training costs in relation to system requirements. 
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.205m: Employee Costs £0.205m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.081m: Employee Costs £0.081m.
26

Page 27

Appendix G 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Communications and Strategy Services 
Revised   Projected      
Budget Category Annual Projected  Outturn Over/ % YTD   
Budget Outturn Variance Under Variance Actual Note 
£000 £000 £000   £000               
Employee Costs 2,439 2,426 13 under 0.53% 984 a, b               
Property Costs 140 140 0 - 0.00% 14                 
Supplies & Services 506 506 0 - 0.00% 163                 
Transport & Plant 3 3 0 - 0.00% 1                 
Administration Costs 1,102 1,102 0 - 0.00% 539 
Payments to Other Bodies 539 539 0 - 0.00% 441                 
Payments to Contractors 0 0 0 - 0.00% 0                 
Transfer Payments 0 0 0 - 0.00% 0                 
Financing Charges 351 351 0 - 0.00% 185                 
Total Controllable Exp. 5,080 5,067 13 under 0.26% 2,327                 
Total Controllable Inc. (2,645) (2,645) 0 - 0.00% (688)                 
Net Controllable Exp. 2,435 2,422 13 under 0.53% 1,639   
Variance Explanations
None. 
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.089m: Employee Costs £0.089m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.051m: Employee Costs £0.051m.
27

Page 28

Appendix H 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Administration, Legal, Licensing and Registration 
Revised   Projected       
Budget Category Annual Projected  Outturn Over/ % YTD   
Budget Outturn Variance Under Variance Actual Note 
£000 £000 £000    £000                 
Employee Costs 3,771 3,965 (194) over (5.14%) 1,629 1, a,
b
Property Costs 5 5 0 - 0.00% 2                  
Supplies & Services 287 317 (30) over (10.45%) 191 
Transport & Plant 13 13 0 - 0.00% 10                  
Administration Costs 2,820 2,785 35 under 1.24% 1,234 c                
Payments to Other Bodies 408 408 0 - 0.00% 294                  
Payments to Contractors 0 0 0 - 0.00% 0                  
Transfer Payments 0 0 0 - 0.00% 0                  
Financing Charges 65 67 (2) over (3.08%) 0                  
Total Controllable Exp. 7,369 7,560 (191) over (2.59%) 3,360                  
Total Controllable Inc. (2,789) (3,021) 232 over (8.32%) (874) 2                
Net Controllable Exp. 4,580 4,539 41 under 0.90% 2,486   
Variance Explanations
1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year.
2. The projected over recovery relates to additional one-off licensing income from the triennial licensing renewals for
Private Hire Operators / Drivers and Taxi Operators. 
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.136m: Employee Costs £0.136m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.049m: Employee Costs £0.049m.
c. Budget from Centre for Councillors remuneration: Net Effect £0.487m: Administration Costs £0.487m.
.
28

Page 29

Appendix I 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 5 September 2025 (No. 6) 
Personnel 
Revised   Projected       
Budget Category Annual Projected  Outturn Over/ % YTD   
Budget Outturn Variance Under Variance Actual Note 
£000 £000 £000    £000                              
Employee Costs 6,871 6,923 (52) over (0.76%) 2,875 1, a,
b               
Property Costs 0 0 0 - 0.00% 0                 
Supplies & Services 121 129 (8) over (6.61%) 47 
Transport & Plant 9 9 0 - 0.00% 1                 
Administration Costs 1,205 1,205 0 - 0.00% 389                 
Payments to Other Bodies 234 234 0 - 0.00% 105                 
Payments to Contractors 0 0 0 - 0.00% 0                 
Transfer Payments 0 0 0 - 0.00% 0                 
Financing Charges 36 80 (44) over (122.22%) 0 2               
Total Controllable Exp. 8,476 8,580 (104) over (1.23%) 3,417                 
Total Controllable Inc. (1,801) (1,801) 0 - 0.00% (272)                 
Net Controllable Exp. 6,675 6,779 (104) over (1.56%) 3,145   
Variance Explanations
1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year.
2. The projected overspend is due to higher than budgeted IT equipment leasing costs. 
Budget Virements
a. Budget from Centre for 2025/2026 pay award: Net Effect £0.251m: Employee Costs £0.251m.
b. Budget from Centre for 2025/2026 National Insurance increase: Net Effect £0.093m: Employee Costs £0.093m. 
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2025/2026 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Finance and
Corporate Resources for the period 1 April 2025 to 5 September 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Finance and Corporate Resources capital programme of
£0.645 million, and forecast expenditure of £0.645 million, be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Finance and Corporate
Resources Committee for the financial year 2025/2026.  Further reports will follow
throughout the year. 
3.2. The budget of £0.645 million for Finance and Corporate Resources is based on the
overall Capital Programme for 2025/2026 (June 2025) and includes an update
approved by the Executive Committee on 5 November 2025. 
3.3. The report details the financial position for Finance and Corporate Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2025/2026 Budget 
As detailed in Section 3.2, the revised capital programme for Finance and Corporate
Resources for 2025/2026 is £0.645 million and includes a budget increase of £0.100
million presented to the Executive Committee on 5 November 2025.  The detail of
this adjustment is shown in Appendix A. 
5.2. 2025/2026 Forecast
Appendix A shows a forecast for the financial year of £0.645 million.  For information,
actual expenditure to 5 September is £0.088 million. 
5
31

Page 32

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
5 November 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 25 June 2025
 Executive Committee, 5 November 2025 
List of Background Papers
 Financial ledger to 5 September 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy) 
Ext:  2699 (Tel:  01698 452699)
E-mail: graham.booth@southlanarkshire.gov.uk
32

Page 33

Appendix A 
South Lanarkshire Council
Capital Expenditure 2025/2026
Finance and Corporate Resources Programme
For Period 1 April 2025 – 5 September 2025 
Finance and Corporate
Resources Total Original
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000
Information Technology Services  545 150 (50) 645 645 - 88
TOTAL 545 150 (50) 645 645 - 88 
For Information Only  
Budget Adjustments presented to Executive Committee, 5 November 2025: 
Budget Adjustments 
Upgrade of SLC Website
(total project approved is £0.150m, with £0.100m profiled in 2025/2026) 
Total Budget Adjustments             
£0.100m 
£0.100m   
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources – Workforce
Monitoring – 1 July to 30 September 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for 1 July to 30 September 2025 relating to
Finance and Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for 1 July to 30 September 2025
relating to Finance and Corporate Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Finance and
Corporate Resources provides information on the position for 1 July to 30 September
2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of September 2025 for
Finance and Corporate Resources. 
The Resource absence figure for September 2025 was 4.0%, this figure has
remained unchanged when compared to the previous month and is 2.1% lower than
the Council-wide figure.  Compared to September 2024, the Resource absence
figure has increased by 0.8%. 
Based on the absence figures at September 2025 and annual trends, the annual
average absence for the Resource for 2025/2026 is 3.6% compared to a Council-
wide average figure of 6.0%.
6
35

Page 36

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health overall, 69 referrals were made this
period.  This represents an increase of 31 when compared with the same period last
year. 
4.3. Accident/Incident Statistics
There was one accident/incident recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 1 disciplinary hearing was heard by the Resource.  This
represents an increase of 1 when compared with the same period last year.  One
appeal was heard by the Resource, and no appeals were pending.  No Grievance or
Dignity at Work complaints were raised within the Resource during the period, these
figures are unchanged when compared with the same period last year.   
4.5. Analysis of Leavers (Appendix 2a) 
There were 5 leavers this period who were eligible for an exit interview.  This figure
has increased by 1, when compared with the same period last year.  2 exit interviews
were conducted in this period, this figure has increased by 2 when compared to the
same period last year. 
5. Employee Implications
5.1. There are no implications for employees arising from the information presented in
this report. 
6. Financial Implications
6.1. All financial implications are accommodated within existing budgets. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability or Environmental Implications in terms
of the information contained within this report. 
8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources)
36

Page 37

8 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources – 10 September 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Eileen McPake, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Eileen.McPake@southlanarkshire.gov.uk 
37

Page 38

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 2.8 3.0 April 0.0 0.0 0.0 April 3.6 2.8 3.0 April 5.1 5.2 5.7
May 3.9 3.2 2.7 May 0.0 0.0 0.0 May 3.9 3.2 2.7 May 5.1 5.3 5.6
June 4.2 3.2 2.9 June 0.0 0.0 0.0 June 4.2 3.2 2.9 June 4.7 5.2 5.4
July 3.5 3.5 3.0 July 0.0 0.0 0.0 July 3.5 3.5 3.0 July 3.8 4.1 4.3
August 3.8 2.6 4.0 August 0.0 0.0 0.0 August 3.8 2.6 4.0 August 4.1 4.7 4.7
September 3.9 3.2 4.0 September 0.0 0.0 0.0 September 3.9 3.2 4.0 September 5.3 6.1 6.1
October 3.2 3.2 October 0.0 0.0 October 3.2 3.2 October 5.1 6.0
November 3.5 4.6 November 0.0 0.0 November 3.5 4.6 November 6.2 6.9
December 3.3 4.4 December 0.0 0.0 December 3.3 4.4 December 6.6 7.0
January 2.8 3.7 January 0.0 0.0 January 2.8 3.7 January 6.1 6.7
February 3.5 3.5 February 0.0 0.0 February 3.5 3.5 February 6.4 7.0
March 2.6 3.7 March 0.0 0.0 March 2.6 3.7 March 6.3 6.8
Annual Average 3.5 3.5 3.6 Annual Average 0.0 0.0 0.0 Annual Average 3.5 3.5 3.6 Annual Average 5.4 5.9 6.0
Average Apr-Sep 3.8 3.1 3.3 Average Apr-Sep 0.0 0.0 0.0 Average Apr-Sep 3.8 3.1 3.3 Average Apr-Sep 4.7 5.1 5.3
814 0 814 15628
Council WideManual Workers
No of Employees at 30 September 2025
Resource Total
No of Employees at 30 September 2025
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Finance and Corporate Resources
No of Employees at 30 September 2025 No of Employees at 30 September 2025
APT&C
38

Page 39

Jul - Sep Jul - Sep
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 18 22
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 38 69
Jul - Sep Jul - Sep
2024 2025
Minor 0 1
Total Accidents/Incidents 0 1
Jul - Sep Jul - Sep
2024 2025
Total Number of Hearings 0 1
Total Number of Appeals 0 1
Time Taken to Convene Hearing October - Jul to Sep 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 1 0
Jul - Sep Jul - Sep
2024 2025
Number of Grievances 0 0
Jul - Sep Jul - Sep
2024 2025
Number of Incidents 0 0
RECORD OF DIGNITY AT WORK
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
FINANCE AND CORPORATE  RESOURCES
9 15
1 3
10 29
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
39

Page 40

Jul - Sep Jul - Sep
2024 2025
Career Advancement 0 1
Child Caring / Caring Responsibilities 0 1
Personal Reasons 0 2
Poor relationship with managers / colleagues 0 1
Other 4 0
Total Number of Leavers Eligible for Exit Interview 4 5
Number of Exit Interviews conducted 0 2
Percentage of interviews conducted 0% 40%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
FINANCE AND CORPORATE  RESOURCES
40

Page 41

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council-wide Workforce Monitoring – 1 July to 30
September 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period 1 July to 30
September 2025
[1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for the period 1 July to 30
September 2025 relating to the Council be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Committee.  This report for the Council
provides information on the position for the period 1 July to 30 September 2025. 
4. Attendance Statistics
4.1. Information on absence statistics for the Council and each Resource, as analysed for
September 2025, is provided in Appendices 1 to 8.  Points to note are:- 
The Council’s absence rate for September 2025, shown in Appendix 1, is 6.1%
which represents an increase of 1.4% when compared to the previous month the
figure remains unchanged at 6.1% when compared to September 2024. 
When compared to September 2024, the APT&C absence rate has decreased by
0.3%, the teachers’ figure has increased by 0.6% and the manual workers’ figure
remains unchanged at 8.3%. 
Based on annual trends and the absence rate to September 2025, the annual
average absence rate for the Council for 2025/2026 is 6.0%. 
7
41

Page 42

In comparison to September 2024 (Appendix 8):- 
 psychological and musculoskeletal conditions are the main reasons for absence
 total days lost due to psychological conditions have increased by 914 days
 total days lost due to musculoskeletal conditions have decreased by 103 days 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
5. Occupational Health
5.1. Information on Occupational Health for the period 1 July to 30 September 2025 is
provided in Appendix 9. 
 during the period there were 356 employees referred for a medical examination,
which is an increase of 38 when compared to the same period last year.  Both
musculoskeletal and psychological conditions continue to be the main reason for
medical referrals
 a total of 459 employees attended physiotherapy treatment, showing an increase
of 46 when compared to the same period last year.  Of the 459 employees
referred, 71% remained at work whilst undertaking treatment
 during this period 522 employees were referred to the Employee Support Officer,
showing an increase of 182 when compared with the same period last year.  Of
the referrals made this period, 54% related to personal reasons
 147 employees were referred to the PAM Assist counselling service this period,
showing a decrease of 11 when compared with the same period last year.  All the
referrals made this period were made directly by employees.  Personal reasons
accounted for 22% of the referrals made, 17% were for work related reasons and
61% was for other reasons
 99 employees were referred for Cognitive Behavioural Therapy this period, an
increase of 78 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident report for 1 July to 30 September 2025 is contained in
Appendix 10. 
 the number of accidents/incidents recorded was 529 of those, all 529 have been
investigated
 of those investigated, no specified injuries were recorded
 of those investigated there were 528 minor accidents/incidents
 of those investigated there were no accidents that resulted in an absence lasting
over 3 days
 of those investigated there was 1 accident that resulted in an absence lasting
over 7 days 
7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals
7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation
Referrals for 1 July to 30 September 2025 is contained in Appendices 11, 12a and
12b.
42

Page 43

During the period:- 
 a total of 43 disciplinary hearings were held across Resources within the Council,
this figure has increased by 11 when compared to the same period last year
 action was taken in 39 of these cases.  One appeal was raised against the
outcome and was not upheld
 our target is to convene disciplinary hearings within 6 weeks, 56% of hearings
met this target
 6 grievances were submitted, all of which are currently being investigated
 7 Dignity at Work complaints were raised, all of which are currently being
investigated
 2 referrals for mediation were submitted 
8. Analysis of Leavers and Exit Interviews
8.1. Information on the number of leavers and exit interviews for the period 1 July to 30
September 2025 is contained in Appendix 13.  Exit interviews are conducted with
employees who leave voluntarily. 
Labour Turnover 
Using information compiled from Resources and Staffing Watch information as at
14 June 2025, the Council’s turnover figure for 1 July to 30 September 2025 is as
follows:- 
156 leavers eligible for exit interviews/15,588 employees in post = Labour Turnover
of 1.0%. 
Based on the figure at September 2025, the annual labour turnover figure for the
financial year 2025/2026 for the Council is 3.4%. 
8.2. Analysis of Leavers and Exit Interviews 
 156 employees left the Council that were eligible for an exit interview, this is a
decrease of 63 when compared with the same period last year
 a total of 51 exit interviews were conducted which is an increase of 48 when
compared with same period last year 
9. Recruitment Monitoring
9.1. Information on Recruitment Monitoring for 1 July to September 30 2025 is contained
within Appendix 14. 
From an analysis of Equal Opportunities Monitoring Forms, the main points to note
are:- 
 overall, 6,504 applications and 6,501 completed Equal Opportunities Monitoring
Forms were received
 of those applicants who declared themselves as disabled (494), 222 were
shortleeted for interview and 23 were appointed
 of those applicants of a black/ethnic minority background (811), 221 were
shortleeted for interview and 13 were appointed
 Of those applicants who are veterans (61), 28 was shortleeted for interview and 3
were appointed
43

Page 44

10. Employee Implications
10.1. There are no implications for employees arising from the information presented in
this report. 
11. Financial Implications
11.1. All financial implications are accommodated within existing budgets. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no climate change, sustainability or environmental implications arising
from the information presented in this report. 
13. Other Implications
13.1. There are no implications for risk in terms of the information contained within this
report. 
14. Integrated Impact Assessment and Consultation Requirements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
14.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources Committee – 10 September 2025 
List of Background Papers
 Monitoring information provided by Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
44

Page 45

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.2 5.2 6.0 April 2.8 2.9 3.5 April 7.0 7.3 7.3 April 5.1 5.2 5.7
May 5.1 5.4 5.6 May 3.2 3.0 3.8 May 6.2 7.1 7.4 May 5.1 5.3 5.6
June 4.9 5.3 5.6 June 2.2 2.8 2.9 June 6.5 7.2 7.5 June 4.7 5.2 5.4
July 4.0 4.3 4.6 July 1.1 1.0 1.4 July 5.8 6.3 6.5 July 3.8 4.1 4.3
August 4.2 4.6 5.0 August 1.3 1.9 1.7 August 6.2 7.5 7.0 August 4.1 4.7 4.7
September 5.2 6.2 5.9 September 2.9 3.5 4.1 September 7.6 8.3 8.3 September 5.3 6.1 6.1
October 5.2 6.3 October 2.7 3.8 October 7.1 7.7 October 5.1 6.0
November 6.1 7.0 November 4.3 5.0 November 8.1 8.4 November 6.2 6.9
December 6.7 7.1 December 4.8 5.4 December 7.8 8.5 December 6.6 7.0
January 5.8 6.8 January 4.8 4.9 January 7.8 8.3 January 6.1 6.7
February 6.3 7.0 February 4.9 4.9 February 8.0 9.0 February 6.4 7.0
March 6.3 7.0 March 4.1 4.5 March 8.1 8.4 March 6.3 6.8
Annual Average 5.4 6.0 6.2 Annual Average 3.3 3.6 3.8 Annual Average 7.2 7.8 7.9 Annual Average 5.4 5.9 6.0
Average Apr-Sep 4.8 5.2 5.5 Average Apr-Sep 2.3 2.5 2.9 Average Apr-Sep 6.6 7.3 7.3 Average Apr-Sep 4.7 5.1 5.3
7196 4032 4400 15628
Council Wide
No of Employees at 30 September 2025 No of Employees at 30 September 2025
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Council Wide
APT&C Teachers
No of Employees at 30 September 2025 No of Employees at 30 September 2025
Manual Workers
45

Page 46

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7
May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6
June 4.3 4.1 3.6 June 5.9 6.4 7.4 June 5.7 6.0 6.8 June 4.7 5.2 5.4
July 2.3 3.8 3.6 July 4.6 4.5 5.9 July 4.3 4.4 5.5 July 3.8 4.1 4.3
August 3.0 3.4 2.5 August 5.2 6.2 6.7 August 4.9 5.7 6.1 August 4.1 4.7 4.7
September 2.5 3.8 3.5 September 7.1 7.5 8.2 September 6.4 6.9 7.4 September 5.3 6.1 6.1
October 2.0 4.2 October 7.0 7.2 October 6.3 6.7 October 5.1 6.0
November 2.6 3.6 November 8.1 8.3 November 7.3 7.6 November 6.2 6.9
December 3.0 3.8 December 7.5 8.1 December 6.8 7.4 December 6.6 7.0
January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7
February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0
March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8
Annual Average 3.2 3.7 3.5 Annual Average 6.8 7.2 7.6 Annual Average 6.2 6.6 6.9 Annual Average 5.4 5.9 6.0
Average Apr-Sep 3.2 3.6 3.2 Average Apr-Sep 5.9 6.3 7.1 Average Apr-Sep 5.5 5.9 6.5 Average Apr-Sep 4.7 5.1 5.3
577 2835 3412 15628
Manual Workers Resource Total
No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025
Appendix 2
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Community and Enterprise Resources
APT&C Council Wide
46

Page 47

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.0 5.4 6.8 April 2.8 2.9 3.5 April 3.8 4.0 4.9 April 5.1 5.2 5.7
May 5.4 6.0 6.6 May 3.2 3.0 3.8 May 4.2 4.4 5.0 May 5.1 5.3 5.6
June 4.8 5.5 6.3 June 2.2 2.8 2.9 June 3.4 4.1 4.4 June 4.7 5.2 5.4
July 3.4 3.2 3.8 July 1.1 1.0 1.4 July 2.2 2.0 2.4 July 3.8 4.1 4.3
August 4.0 3.9 4.4 August 1.3 1.9 1.7 August 2.5 2.8 2.8 August 4.1 4.7 4.7
September 5.9 6.6 5.8 September 2.9 3.5 4.1 September 4.3 4.9 4.8 September 5.3 6.1 6.1
October 5.5 6.5 October 2.7 3.8 October 4.0 5.0 October 5.1 6.0
November 7.1 7.8 November 4.3 5.0 November 5.6 6.2 November 6.2 6.9
December 8.1 8.6 December 4.8 5.4 December 6.3 6.8 December 6.6 7.0
January 6.6 8.0 January 4.8 4.9 January 5.6 6.3 January 6.1 6.7
February 7.2 8.4 February 4.9 4.9 February 6.0 6.5 February 6.4 7.0
March 7.5 8.3 March 4.1 4.5 March 5.7 6.2 March 6.3 6.8
Annual Average 5.9 6.5 6.8 Annual Average 3.3 3.6 3.8 Annual Average 4.5 4.9 5.1 Annual Average 5.4 5.9 6.0
Average Apr-Sep 4.8 5.1 5.6 Average Apr-Sep 2.3 2.5 2.9 Average Apr-Sep 3.4 3.7 4.1 Average Apr-Sep 4.7 5.1 5.3
3158 4032 7190 15628
Appendix 3
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Education Resources
Council WideAPT&C Teachers Resource Total
No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025
47

Page 48

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 2.8 3.0 April 0.0 0.0 0.0 April 3.6 2.8 3.0 April 5.1 5.2 5.7
May 3.9 3.2 2.7 May 0.0 0.0 0.0 May 3.9 3.2 2.7 May 5.1 5.3 5.6
June 4.2 3.2 2.9 June 0.0 0.0 0.0 June 4.2 3.2 2.9 June 4.7 5.2 5.4
July 3.5 3.5 3.0 July 0.0 0.0 0.0 July 3.5 3.5 3.0 July 3.8 4.1 4.3
August 3.8 2.6 4.0 August 0.0 0.0 0.0 August 3.8 2.6 4.0 August 4.1 4.7 4.7
September 3.9 3.2 4.0 September 0.0 0.0 0.0 September 3.9 3.2 4.0 September 5.3 6.1 6.1
October 3.2 3.2 October 0.0 0.0 October 3.2 3.2 October 5.1 6.0
November 3.5 4.6 November 0.0 0.0 November 3.5 4.6 November 6.2 6.9
December 3.3 4.4 December 0.0 0.0 December 3.3 4.4 December 6.6 7.0
January 2.8 3.7 January 0.0 0.0 January 2.8 3.7 January 6.1 6.7
February 3.5 3.5 February 0.0 0.0 February 3.5 3.5 February 6.4 7.0
March 2.6 3.7 March 0.0 0.0 March 2.6 3.7 March 6.3 6.8
Annual Average 3.5 3.5 3.6 Annual Average 0.0 0.0 0.0 Annual Average 3.5 3.5 3.6 Annual Average 5.4 5.9 6.0
Average Apr-Sep 3.8 3.1 3.3 Average Apr-Sep 0.0 0.0 0.0 Average Apr-Sep 3.8 3.1 3.3 Average Apr-Sep 4.7 5.1 5.3
814 0 814 15628
Council WideManual Workers
No of Employees at 30 September 2025
Resource Total
No of Employees at 30 September 2025
Appendix 4
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Finance and Corporate Resources
No of Employees at 30 September 2025 No of Employees at 30 September 2025
APT&C
48

Page 49

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 5.7 5.3 5.6 April 6.9 7.2 4.8 April 6.2 6.1 5.3 April 5.1 5.2 5.7
May 4.9 5.2 4.5 May 6.1 8.1 5.7 May 5.4 6.4 5.0 May 5.1 5.3 5.6
June 5.4 5.7 5.1 June 6.8 8.4 6.0 June 6.0 6.8 5.5 June 4.7 5.2 5.4
July 5.0 5.3 5.2 July 8.1 8.6 6.4 July 6.2 6.7 5.7 July 3.8 4.1 4.3
August 5.1 5.5 5.4 August 8.5 8.8 6.0 August 6.4 6.9 5.7 August 4.1 4.7 4.7
September 4.7 7.5 5.9 September 7.8 7.4 6.7 September 6.0 7.5 6.2 September 5.3 6.1 6.1
October 4.9 7.3 October 5.2 6.0 October 5.0 6.8 October 5.1 6.0
November 4.8 6.8 November 6.7 6.2 November 5.6 6.5 November 6.2 6.9
December 5.1 6.4 December 7.4 5.8 December 6.0 6.2 December 6.6 7.0
January 4.4 7.0 January 6.0 6.2 January 5.0 6.7 January 6.1 6.7
February 5.2 7.0 February 6.3 7.1 February 5.6 7.0 February 6.4 7.0
March 5.3 6.8 March 7.2 5.9 March 6.1 6.4 March 6.3 6.8
Annual Average 5.0 6.3 6.1 Annual Average 6.9 7.1 6.1 Annual Average 5.8 6.7 6.1 Annual Average 5.4 5.9 6.0
Average Apr-Sep 5.1 5.8 5.3 Average Apr-Sep 7.4 8.1 5.9 Average Apr-Sep 6.0 6.7 5.6 Average Apr-Sep 4.7 5.1 5.3
867 548 1415 15628
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
APT&C Manual Workers Council Wide
No of Employees at 30 September 2025No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025
49

Page 50

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 6.5 6.5 7.0 April 9.4 8.8 9.4 April 7.4 7.3 7.8 April 5.1 5.2 5.7
May 5.8 5.8 6.6 May 8.4 9.5 8.6 May 6.6 7.0 7.2 May 5.1 5.3 5.6
June 5.5 6.0 6.6 June 8.6 9.2 8.7 June 6.5 7.0 7.3 June 4.7 5.2 5.4
July 5.4 6.5 6.8 July 8.8 11.2 9.0 July 6.5 8.0 7.5 July 3.8 4.1 4.3
August 4.8 6.9 7.1 August 8.6 11.4 8.7 August 6.0 8.4 7.7 August 4.1 4.7 4.7
September 5.6 7.2 7.7 September 9.3 12.0 10.0 September 6.8 8.8 8.5 September 5.3 6.1 6.1
October 6.5 7.5 October 8.5 11.0 October 7.1 8.6 October 5.1 6.0
November 7.3 8.1 November 9.0 10.0 November 7.8 8.7 November 6.2 6.9
December 7.4 7.0 December 9.5 11.6 December 8.1 8.5 December 6.6 7.0
January 7.0 6.7 January 10.3 11.3 January 8.1 8.2 January 6.1 6.7
February 7.0 7.0 February 9.9 11.6 February 7.9 8.5 February 6.4 7.0
March 7.1 7.5 March 9.4 10.7 March 7.9 8.6 March 6.3 6.8
Annual Average 6.3 6.9 7.1 Annual Average 9.1 10.7 10.1 Annual Average 7.2 8.1 8.1 Annual Average 5.4 5.9 6.0
Average Apr-Sep 5.6 6.5 7.0 Average Apr-Sep 8.9 10.4 9.1 Average Apr-Sep 6.6 7.8 7.7 Average Apr-Sep 4.7 5.1 5.3
1780 1017 2797 15628
Appendix 6
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Social Work Resources
APT&C Council WideResource TotalManual Workers
No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025 No of Employees at 30 September 2025
50

Page 51

Appendix 7
Absence by long and short term
From: 1 July to 30 September 2025
Community and Enterprise 3412 1.3 4.2 5.5 2.1 4.0 6.1 2.8 4.6 7.4
Education 7190 0.2 2.2 2.4 1.3 1.5 2.8 2.0 2.8 4.8
Finance and Corporate 814 0.7 2.3 3.0 1.6 2.4 4.0 1.1 2.9 4.0
Housing & Technical 1415 1.5 4.2 5.7 1.9 3.8 5.7 2.4 3.8 6.2
Social Work 2797 2.2 5.3 7.5 2.4 5.3 7.7 2.6 5.9 8.5
Council Overall for July to
September 2025 15628 1.0 3.3 4.3 1.7 3.0 4.7 2.3 3.8 6.1
August 2025
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
September 2025
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
Resource No of
employees
Resource
Total
Absence %
July 2025
Total Short
Term %
Total Long
Term %
51

Page 52

From : 1 September 2025 to 30 September 2025
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1544 29 1134 17 65 11 490 29 806 20 4039 22
Psychological 1579 30 2439 36 356 58 502 30 1672 42 6548 36
Stomach, Bowel, Blood, Metabolic Disorders 485 9 818 12 26 4 97 6 376 9 1802 10
Respiratory 463 9 819 12 79 13 227 14 366 9 1954 11
Other Classification 1169 22 1492 22 88 14 365 22 780 20 3894 21
Total Days Lost By Resource 5240 100 6702 100 614 100 1681 100 4000 100 18237 100
Total Work Days Available
From : 1 September 2024 - 30 September 2024
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1429 30 1122 17 66 14 626 32 899 21 4142 23
Psychological 1177 25 2222 33 147 31 590 30 1498 35 5634 31
Stomach, Bowel, Blood, Metabolic Disorders 543 11 677 10 39 8 220 11 526 12 2005 11
Respiratory 405 9 991 15 100 21 187 10 569 13 2252 12
Other Classification 1183 25 1718 26 122 26 331 17 743 18 4097 23
Total Days Lost By Resource 4737 100 6730 100 474 100 1954 100 4235 100 18130 100
Total Work Days Available
Finance and
Corporate
Housing and
Technical
Resources
137247
70720 138985 15367
69051 14944 26089
Finance and
Corporate
26901 47317
Appendix 8
Attendance Monitoring
Absence Classification
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total
WDL By
Reason
48396
Education
Resources
Percentage
Housing and
Technical
Resources
Education
Resources
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total
WDL By
Reason
Percentage
52

Page 53

Appendix 9
Teachers Others
79 18 47 15 52 145
70 26 48 9 61 104
Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025
125 129 58 115 1 2
47 39 115 180 0 17
72 81 18 22 0 0
10 29 43 44 0 1
46 53 106 161 Social Work 2 12
113 128 340 522 Not Disclosed 18 67
413 459 Total 21 99
Reason Jul-Sep 2024 Jul-Sep 2025
Work Stress 34 25
Addicition 3 0
Personal 45 33
Anxiety/Depression 65 74
Bereavement 11 15
Total 158 147
Finance and Corporate
Education
Community and Enterprise
Resource
Housing and Technical
Occupational Health Reports
From: 1 July 2025 - 30 September 2025 comparison with 1 July 2024 - 30 September 2024
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
Total (Jul-Sep 2025) 356
Total (Jul-Sep 2024) 318
No of Employees Referred For Physiotherapy No of Employees Referred To Employee Support Officer No of Employees Referred For Cognitive Behavioural Therapy
Resource Resource
Community and Enterprise Community and Enterprise
Education (Teachers) Education
Education (Others) Finance and Corporate
Analysis of Counselling Referrals by Cause
Total
Finance and Corporate Housing and Technical
Housing and Technical Social Work
Social Work Total
53

Page 54

Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025 Jul-Sep 2024 Jul-Sep 2025
Specified Injury 2 0 0 0 0 0 0 0 0 0 2 0
Specified Injury (Violence) 0 0 1 0 0 0 1 0 0 0 2 0
Total Specified Injury* 2 0 1 0 0 0 1 0 0 0 4 0
Over 7 Day 6 0 2 0 0 0 3 1 4 0 15 1
Over 7 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 7 Day** 6 0 2 0 0 0 3 1 4 0 15 1
Over 3 Day 1 0 0 0 0 0 0 0 2 0 3 0
Over 3 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3 Day** 1 0 0 0 0 0 0 0 2 0 3 0
Minor Injury 24 28 38 34 0 1 7 1 8 19 77 83
Near Miss 4 6 3 17 0 0 0 0 2 4 9 27
Violence (Physical) 6 7 210 352 0 0 0 0 7 9 223 368
Violence (Verbal) 3 3 24 31 0 0 1 6 9 10 37 50
Total Minor*** 37 44 275 434 0 1 8 7 26 42 346 528
Total Finalised 46 44 278 434 0 1 12 8 32 42 368 529
Accident 0 0 0 0 0 0 0 0 0 0 0 0
Incident 0 0 1 0 0 0 0 0 0 0 1 0
Violence (Physical) 0 0 0 0 0 0 0 0 1 0 1 0
Violence (Verbal) 0 0 0 0 0 0 0 0 0 0 0 0
Near Miss 0 0 0 0 0 0 0 0 0 0 0 0
Total to be investigated**** 0 0 1 0 0 0 0 0 1 0 2 0
Total Events/Month 46 44 279 434 0 1 12 8 33 42 370 529
Appendix 10
Analysis of Accidents / Incidents
From: 1 July 2025 - 30 September 2025 comparison with 1 July 2024 - 30 September 2024
Accidents by Month of Occurrence
Community and Enterprise Education Finance and Corporate Housing & Tech Social Work TOTAL
**Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury)
***A minor injury is an injury not covered by  Over 7 day, Over 3 day or Specified
****In process relates to records not yet investigated/defined by managers
*Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or penetrating
injury as defined by the HSE
54

Page 55

APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total
Community and Enterprise 0 13 N/A 13 0 0 N/A 0 0 13 N/A 13 4 5 4 69% 13.69
Education 1 0 0 1 0 0 0 0 1 0 0 1 0 0 1 0% 1
Finance and Corporate 1 0 N/A 1 1 0 N/A 1 0 0 N/A 0 0 1 0 100% 1
Housing and Technical 0 4 N/A 4 0 0 N/A 0 0 4 N/A 4 2 1 1 75% 4
Social Work 2 22 N/A 24 1 2 N/A 3 1 20 N/A 21 8 3 13 46% 24
Total  (Jul-Sep 2025) 4 39 0 43 2 2 0 4 2 37 0 39 14 10 19 56% 43
Total  (Jul-Sep 2024) 15 13 4 32 3 0 0 3 12 13 4 29 5 12 15 53% 32
APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total
Total  (Jul-Sep 2025) 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0
Total  (Jul-Sep 2024) 0 2 0 2 0 0 0 0 0 0 0 0 0 2 0 2 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 July - 30 September 2025
Appeal's Panel
Total 0
Not Upheld Total
Appeals
Pending
1
Withdrawn
1
Resource
Resource
Action Taken
Upheld Upheld in Part
Manual/ Craft
Outcome of Disciplinary Hearings
Manual/ Craft
Upheld
APT&C
Upheld in Part
Teachers
% Held within
6 Weeks
No of Appeals
No Action
APT&C 4-6 6+3Teachers Total
No of Disciplinary Hearings
010
Appendix 11
Outcome of Appeals
Not Upheld
From: 1 July 2025 - 30 September 2025 comparison with 1 July 2024 - 30 September 2024
Appeals pending to date
Record of Disciplinary Hearings
No of weeks to convene Disciplinary Hearing
Total
55

Page 56

Appendix 12a
Record of Grievances
From: 1 July 2025 - 30 September 2025 comparison with 1 July 2024 - 30 September 2024
Grievances No of Grievances No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Total (Jul-Sep 2025) 6 0 0 0 6
Total (Jul-Sep 2024) 5 0 3 0 2
Dignity at Work
From: 1 July 2025 - 30 September 2025 comparison with 1 July 2024 - 30 September 2024
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Total (Jul-Sep 2025) 7 0 0 0 0 7
Total (Jul-Sep 2024) 10 1 6 0 0 3
56

Page 57

Referrals for Workplace Mediation
As at September 2025
Workplace Mediation Jul-25 Aug-25 Sep-25
No of Referrals 2 0 0
*No of Successful Cases 0 1 1
*No of Unsuccessful Cases 0 0 0
No of cases unsuitable for mediation 1 2 0
Workplace Mediation Jul-24 Aug-24 Sep-24
No of Referrals 0 1 0
*No of Successful Cases 0 0 0
*No of Unsuccessful Cases 0 0 0
No of cases unsuitable for mediation 0 0 1
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
Appendix 12b
57

Page 58

Appendix 13
From 1 July 2025 - 30 September 2025
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 7 32 1 0 9 49 31%
Personal Reasons 14 8 2 1 8 33 21%
Further Education 1 6 0 3 0 10 6%
Moving outwith area 1 4 0 0 4 9 6%
Child Caring / Caring
Responsibilities 2 2 1 0 1 6 4%
Disatisfaction with terms and
conditions 0 2 0 2 0 4 2%
Poor relationship with managers /
colleagues 0 0 1 0 0 1 1%
Travelling difficulties 0 0 0 1 0 1 1%
Other 9 22 0 3 9 43 28%
Total no. of leavers per Resource
eligible for an exit interview 34 76 5 10 31 156 100%
Number of exit interviews
conducted 10 26 2 2 11 51
% of leavers interviewed 29% 34% 40% 20% 35% 33%
From 1 July 2024 - 30 September 2024
Total no. of leavers per Resource
eligible for an exit interview 68 107 4 18 22 219
Number of exit interviews
conducted 2 1 0 0 0 3
% of leavers interviewed 3% 1% 0% 0% 0% 1%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
58

Page 59

Appendix 14
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
6501 2659 463 41% 7% 17%
2482 700 119 28% 5% 17%
4019 1956 345 49% 9% 18%
494 222 23 45% 5% 10%
5470 2187 394 40% 7% 18%
779 414 67 53% 9% 16%
811 221 13 27% 2% 6%
1057 314 22 30% 2% 7%
5038 2036 344 40% 7% 17%
61 28 3 46% 5% 11%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
2013 567 152 28% 8% 27%
826 201 39 24% 5% 19%
1182 352 103 30% 9% 29%
62 20 3 32% 5% 15%
1684 436 104 26% 6% 24%
317 120 37 38% 12% 31%
1754 512 139 29% 8% 27%
232 41 2 18% 1% 5%
18 4 1 22% 6% 25%
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 July 2025 - 30 September 2025
Total Number of applications received: 6504
Total Number of Equal Opportunities Monitoring forms received: 6501
Total Number of posts advertised: 234
Total Number of appointments: 467
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of Minority Ethnic applicants*
Total No of BME applicants
Total No of White applicants**
Total No of Veteran applicants
*includes Mixed, Asian, Black, White (Irish, Polish, Gypsy/Traveller, Roma, Showman/Showwoman, other
From : 1 July 2024 - 30 September 2024
Total Number of applications received: 2048
** includes White Scottish and White Other British
Total No of applicants aged under 50
Total Number of Equal Opportunities Monitoring forms received: 2013
Total Number of posts advertised: 268
Total Number of appointments: 167
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
59

Page 60

60

Page 61

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resource Plan: 
Quarter 2 Progress Report 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Finance and Corporate Resource Plan Quarter 2 Progress Report
2025/2026, for the period 1 April 2025 to 30 September 2025
[1purpose]
2. Recommendations
2.1. The Committee is asked to note the following recommendation(s):-
[
(1) that the Finance and Corporate Resource Plan Quarter 2 Progress Report
2025/2026 as summarised in paragraph 5.2. and attached as Appendix 2 of
this report, be noted; 
(2) that the key achievements made by the Resource for the year, as detailed in
paragraph 5.3. of this report, be noted; and
(3) that the areas of improvement as detailed in paragraph 5.4. of this report, be
noted. 
3. Background
3.1. The Finance and Corporate Resource Plan 2025/2026 was approved by this
Committee on 11 June 2025 and sets out the outcomes, measures and actions to be
managed and delivered by the Resource for the financial year 2025/2026. 
3.2. The Resource Plan follows the agreed corporate structure and style.  The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2025/2026
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2025/2026.  These are detailed at Appendix 1. 
5. Quarter 4 Progress Report 2025/2026
5.1. Progress against all Resource Plan measures is contained in the Quarter 4 Progress
Report 2025/2026, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:-
8
61

Page 62

Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report.  To ensure adequate scrutiny of performance across all Resources, the
council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or ‘amber’
measures at a future meeting. 
The overall summary of progress to date is set out in the table below:- 
Status Measures
Statistical  Project  Total %
Blue N/A 2 2 5%
Green  15 13 28  68%
Amber  4 0 4  10%
Red     2 2 4  10%
Report later/Contextual 0 3 3   7%
Totals  21 20 41 100%  
(Data correct as at 21 Oct 2025) 
5.3. Key achievements for 2025/2026, to date, are noted below:- 
5.3.1. 
Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
Individuals and
communities in South
Lanarkshire are
engaged and able to
participate in decision-
making processes
Nothing to report at this time 
Connect Outcome  Education and Learning
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
62

Page 63

Connect Outcome:  Health and Wellbeing 
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Children and Young People
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Housing and Land
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome  Our Economy
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
5.3.2. In addition to working towards these Outcomes, we recognise that the council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and achieving Best Value
Resource
Outcome
Achievement 
Customers
experience high
quality and
improving council
services
Nothing to report at this time
The council
demonstrates high
standards of
governance and
sound financial
stewardship
Nothing to report at this time
The workforce has
the skills, flexibility
and capacity to
deliver the council’s
priorities.
During the period 1 April 2025 – 30 September 2025, SLC
employees completed 42,293 eLearning modules. 
In the same period 3,604 employees attended 380 classroom-
based events, and 526 employees attended 52 virtual online
events. 
63

Page 64

Digital and ICT
service meet the
needs of the council
and its customers
The Digital Telecare Project has been formally signed off and
closed. 
5.4. Areas for improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why, and the
management action now being taken, where applicable. 
Delivering the plan and achieving Best Value
Resource Outcome:   Digital and ICT services meet the needs of the council and its
customers
Measure  Comments/Progress Action by
Manager 
Migrate to new
Integrated Housing and
Property Management
system
Project Review Board (PRB) considering
revised timeline for new go live date
Revised timeline and
project plan re-
alignment currently
underway.
Migrate to new Social
Work Information system
Project Review Board (PRB) considering
revised timeline for new go live date
Revised timeline and
project plan re-
alignment currently
underway.
Resource Outcome:   The council demonstrates high standards of governance and
sound financial stewardship
Liquor licensing
processing – target 97% 
Our monthly totals for Q2 are as follows:-
July 2025 – 91.26%
August 2025 – 97.54%
September 2025 – 97%
This gives a running total of 84.18%, and
whilst the PI has not been met all statutory
deadlines have been and shows an
increase of 8.7% from Quarter 1 which
were as follows:
April 2025 – 81.32%
May 2025 – 74.76%
June 2025 – 71.67%
(Running total for Quarter 1 was 75.48%) 
Quarter 2 was particularly challenging in
the month of July for the Team due to
preparation for annual fee invoices, and
the increase in marriage registrations, as
well as an increase in civic and liquor
applications, alongside other ongoing
business and summer annual leave.  The
months of August and September were
improved and successful in meeting the
targets. 
Team Leaders have
been reminded to
continue to allocate
tasks depending on
the nature of the
business within
performance targets
where possible. 
Management team
will continue to
oversee this. 
64

Page 65

We continue to work towards a sustained
improvement in performance, including
through planned staff training, recruitment
to vacancies, active absence
management, review of staff
accommodation arrangements and more
proactive allocation of tasks.  Longer term
it is anticipated that the planned
introduction of an upgraded licensing case
management system in 2026 will also
assist 
Registration processing
– target 97.5%
Our monthly totals for Q2 are as follows:-
July 2025 – 83.78%
August 2025 – 99.78%
September 2025 – 99.59%
This gives a running total of 86.12% for
the period, and whilst the PI has not been
met all statutory deadlines have been and
shows an increase of 10.31% from
Quarter 1 which were as follows:
April 2025 – 99.35%
May 2025 – 84.61%
June 2025 – 68.56%
(Running total for Quarter 1 was 75.81%)  
Quarter 2 was particularly challenging in
the month of July for the Team due to
preparation for annual fee invoices, and
the increase in marriage registrations, as
well as an increase in civic and liquor
applications, alongside other ongoing
business and summer annual leave.  The
months of August and September were
improved and successful in meeting the
targets.  
We continue to work towards a sustained
improvement in performance, including
through planned staff training, recruitment
to vacancies, active absence
management, review of staff
accommodation arrangements and more
proactive allocation of tasks. 
Team Leaders have
been reminded to
allocate tasks
depending on the
nature of the
business within
performance targets
where possible. 
Management team
will continue to
oversee this. 
5.5.  Report later 
Measures in the quarterly progress reports which are not blue, red, amber or green
can be assigned a status of ‘report later’ or ‘contextual’.  A further analysis
introduced to aid scrutiny of performance, is to follow up the measures in these
categories from the Quarter 4 2024-25 report.  There were no measures identified as
‘report later’ or ‘contextual’ in that report so no further action or analysis is required.
65

Page 66

6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy. 
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2025/2026. 
9. Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10.  Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
21 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027 
Previous References
 Finance and Corporate Resources Quarter 2 Progress Report 2024/2025, Finance and
Corporate Resources Committee – 29 January 2025 
66

Page 67

List of Background Papers
 Council Plan Connect 2022 to 2027 – approved by the full Council on 15 June 2022
 Finance and Corporate Resource Plan 2025/2026 – approved by Finance and
Corporate Resources Committee on 11 June 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little (Head of Communications and Strategy)
Ext:  4904 (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk
67

Page 68

Appendix 1 
Finance and Corporate Resource Outcomes 2025-26  
Connect Outcomes  Resource Outcomes
Communities and
Environment 
• Individuals and communities in South Lanarkshire are
engaged and able to participate in decision-making
processes
Education and
Learning 
• No Resource Outcomes for this Connect Outcome
Health and
Wellbeing
• No Resource Outcomes for this Connect Outcome
Children and Young
People 
• No Resource Outcomes for this Connect Outcome
Housing and Land  • No Resource Outcomes for this Connect Outcome
Our Economy  • No Resource Outcomes for this Connect Outcome 
Delivering the Plan
and achieving Best
Value
• The council demonstrates high standards of governance
and sound financial stewardship
• Customers experience high quality and improving council
services
• The workforce has the skills, flexibility and capacity to
deliver the council’s priorities
• Digital and ICT services meet the needs of the council and
its customers 
68

Page 69

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 27 Oct 10:44
Quarter 2 : April 2025 - September 2025
South Lanarkshire Council
Finance and Corporate Resources
Resource Plan
(This represents the cumulative position to September 2025)
Performance Report 2025-26
8
69

Page 70

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 27 Oct 10:44
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 0 0 0 0 0
Education and Learning 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 0 0 0 0 0
Delivering the plan and achieving best value 15 4 2 0 21
Total 15 4 2 0 21
Page 1
70

Page 71

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Pay invoices within the target of 28 days Performance is ahead of target due to new system features, including
invoice scanning which replaced manual processing.
Green 92.5% 96.0% 91.7% 94.0% 93.0%
Percentage of income due from Council
Tax received by the end of the year - in
year (incl water)
The annual Council Tax collection target for 2025/2026 has been set at
95.6%. Council Tax collection rate is currently 60.31%, ahead of target
by 0.05%.
Green 95.60% 60.31% 96.77% 95.70% 95.69%
% of Non Domestic rates income achieved To date, a collection rate of 48.0% has been achieved, 0.1% ahead of
target.
Green 97.6% 48.0% 97.8% 97.8% 98.4%
Sundry Income collection There are currently a number of high value invoices outstanding, which
have largely contributed to performance being slightly behind target. We
are actively pursuing customers to secure payment, as well as liaising
with colleagues across the council to resolve disputes and recommend
appropriate cases for write-off and resolution to the non-payment of
debt.
Amber 97.5% 97.1% 98.3% 96.9% 98.2%
Liquor licensing processing target - 97%
within service targets
Despite improvements in performance in Quarter 2 the annual result fell
below the target. July was particularly challenging for the Team due to
preparation for annual fee invoices, and the increase in marriage
registrations, as well as an increase in civic and liquor applications,
alongside other ongoing business and summer annual leave. The
months of August and September were improved and successful in
meeting the targets. Workload is prioritised depending on the nature of
business and priority is given to urgent time critical service requests.
Red 97.0% 84.2% 96.0% 94.0% 80.5%
Registration processing target - 97.5%
within service targets
Despite improvements in performance in Quarter 2 the annual result fell
below the target. July was particularly challenging for the Team due to
preparation for annual fee invoices, and the increase in marriage
registrations, as well as an increase in civic and liquor applications,
alongside other ongoing business and summer annual leave. The
months of August and September were improved and successful in
meeting the targets. Workload is prioritised depending on the nature of
business and priority is given to urgent time critical service requests.
Red 97.5% 86.1% 99.0% 99.0% 95.0%
Citizenship processing target - 97.5%
within service targets
Target has been achieved Green 97.5% 100.0% 100.0% 100.0% 100.0%
Page 2
71

Page 72

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Complaints processing target - 97.5%
within service targets
Target has been achieved Green 97.5% 100.0% 100.0% 100.0% 100.0%
Respond to FOI/EIR Requests within the
statutory timescale
Target met.
The figure given is combined for both FOI and EIR Requests.
The Year to date figures for each element are as follows:
FOI: 95.80
EIR: 96.73
Green 96.0% 96.3% ------ ------ ------
Respond to Data Protection Subject
Access Requests within the statutory
timescale
Target exceeded Green 90.0% 100.0% ------ ------ ------
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Customer Service Centre - % of calls
answered
Due to a high staff turnover, training, absences and new systems this
has had an impact on our performance for the 1st and 2nd quarters of
the year.
We continue to work with Personnel Services regarding recruitment and
in the management of absences. We have also arranged additional
training and support on new systems. As a result we are now seeing a
steady increase in performance levels.
Amber 90.00% 84.00% 94.00% 91.00% 94.00%
Customer Service Centre – average queue
time (in seconds)
Due to a high staff turnover, training, absences and new systems this
has had an impact on our performance for the 1st and 2nd quarters of
the year.
We continue to work with Personnel Services regarding recruitment and
in the management of absences. We have also arranged additional
training and support on new systems. As a result we are now seeing a
steady increase in performance levels.  .
Amber 250 402 134 252 187
Page 3
72

Page 73

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 27 October 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Benefits administration – average
processing times for new Housing Benefit
and Council Tax Reduction claims
Processing times for new claims is currently 13 days, 1 day under target
with annual target of 14 days expected to be achieved.
Green 14 days 13 days 12 days 11 days 11 days
Benefits administration – average
processing times for Housing Benefit and
Council Tax Reduction change in
circumstances
Processing times for change in circumstances is currently 4 days, equal
to target.
Green 4 days 4 days ------ 2 days 2 days
Housing Benefit and Council Tax
Reduction – accuracy of processing
Accuracy performance is currently 97.1%, exceeding the target. Green 95.0% 97.1% 97.1% 95.8% 95.3%
Scottish Welfare Fund – average
processing times for Crisis Grants
Processing times for Crisis Grants is currently equal to target. Green 2 days 2 days 2 days 2 days 2 days
Scottish Welfare Fund – average
processing times for Community Care
grants
Processing times for Community Care Grants is currently under target by
4 working days.
Green 15 days 11 days 13 days 17 days 12 days
Money Matters Advice – customer service -
% cases responded to within 5 days of
initial customer contact
Target met Green 96.00% 97.00% ------ 98.00% 97.00%
Money Matters Advice – 86% of all claims
for benefits to be successful (New)
Delays by SSS processing some claims – up to 7 months currently Amber 86.0% 83.0% ------ ------ 89.0%
Complete food and fuel bank referrals
within 24 hours of request
Target met Green 97.0% 96.0% ------ ------ 98.0%
Make Financial Wellbeing Support Fund
(FWSF) Cash First payments within 24
hours of request
Target met Green 95.0% 99.9% ------ ------ 97.0%
Page 4
73

Page 74

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 0 5 0 0 0 5
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0 0
Children and Young People 0 0 0 0 0 0
Housing and Land 0 0 0 0 0 0
Our Economy 0 0 0 0 0 0
Delivering the plan and achieving best value 2 8 0 2 3 15
Total 2 13 0 2 3 20
Page 5
74

Page 75

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Communities and Environment
Individuals and communities in South Lanarkshire are engaged and able to participate in decision-making processes
Action Measures Comments/ Progress Status
Increase routes for
communities to
participate in decision
making and priority
setting
Increase participation in Stakeholder Groups and the delivery
of Neighbourhood Plans
Participatory Budgeting continues to be a key feature of
neighbourhood planning. Funding is aligned to the delivery of the
priority themes that form the basis of the neighbourhood plans for each
area. PB along with capacity building support catalyses the interest of
local people and empowers communities by  promoting participation in
local democratic decision making, including the allocation of funds,
and the delivery of community led projects and activities.
In August £160,000 was invested in PB across ten neighbourhood
planning area, £120,000  from the UK governments Shared Prospertity
Fund and £40,000 from SLC.
In this round of PB 83 project proposals were received, 63 were fully
funded, 8 were part funded and 10,975 votes were cast by people
living in the ten neighbourhood planning areas.
Green
Develop new Community Engagement and Participation
Strategy 2026-2031
The Community Engagement and Participation Strategy is in
development
Green
Support local
communities to work
together to address
issues that matter to
them by growing their
tools to do so: capacity,
resources, assets.
Increase Community Asset Transfer Support for
Communities
We continue to promote Community Asset Transfer as a means for
community empowerment,  providing pre-application support and
guidance to interested parties.
The ongoing workload is supporting over 50 groups in development of
their applications.
The majority of properties returned to SLC from SLLC have been
transferred into community ownership via short term concessionary
leases which will be converted to full Community Asset Transfers
(CATs) in due course.
Green
Take forward IT strategic
developments
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements, including improved
availability and affordability of broadband and 4G/5G mobile
services across the council area
Revised business case developed and remains under consideration. Green
Deliver action plan on Digital Inclusion as key stakeholder of
the Digital Inclusion sub-group.
Digital Inclusion subgroup proceeding with action plan and has now
received funding.  Development of services to be deployed underway.
Green
Page 6
75

Page 76

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Action Measures Comments/ Progress Status
Lead financial planning
and reporting for the
Financial Strategy to be agreed by June 2025 A report titled 2026/2027 to 2027/2028 Revenue Budget Strategy was
presented to the Executive Committee in June 2025.
Complete
council Budget proposals to be considered by members by
December 2025
Budget proposals will be presented to members for consideration in
November 2025.
Report Later
Budget agreed by March 2026 The 2026/2027 revenue budget will be agreed by March 2026. Report Later
Capital programme for 2026-27 to be agreed by March 2026 The 2026/2027 capital programme will be agreed by March 2026. Report Later
Lead on strategic
planning
Develop a mid-term review of the Council Plan, Connect for
consideration by Elected Members in April 2025.
The mid-term review of Connect was approved at Executive
Committee on 30 April 2025 and is available on the council website.
Complete
Take forward IT strategic
developments
To improve the availability and accessibility of local
intelligence about South Lanarkshire and its communities,
develop a dashboard of key facts aligned with Council Plan
outcomes by March 2026.
Work has been completed to define the set of indicators which will
feature in the dashboard, and historical data is being migrated into the
format required for the new dashboard.  A prototype dashboard has
been developed which covers key facts on across the 6 council plan
outcomes.  User feedback on this phase of work will be sought in the
coming months, prior to a general release in 2026.
Green
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Provide effective and
responsive customer
services
Continuous improvement in the provision and uptake of
digital customer contact options
The project is now well underway and the action plan accompanying
this project is progressing as planned.
Green
Monitor the progress of
transformation projects
through reporting
framework to
CMT/PRSF
Report progress of transformational projects regularly to
Performance and Review Scrutiny Forum (PRSF)
An update on the Transformational Review Programme was presented
to the Performance and Review Scrutiny Forum in August 2025.
Updates on the progress of reviews are provided on a regular basis,
with a further update to the Forum due in November.
Green
Page 7
76

Page 77

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 27 October 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Take forward IT strategic
developments
Migrate to new Integrated Housing and Property
Management system
PRB considering proposed revised timeline for new go live date. Red
Develop and deliver training plan to upskill IT staff in new
technologies
Training plan agreed and underway. Green
Migrate to new Social Work Information system PRB considering proposed revised timeline for new go live date. Red
Migrate all analogue telephony services to technology to
align with Ofcom 2025 switch off
Project remains on track. Green
Develop and deliver proof of value business case for the use
of artificial intelligence within the council
Development of an AI accelerator approach is well underway and will
be available to all Resources.
Green
Develop and support delivery of cross-resource Digital
Transformation programme
Programme well developed and underway.  Key focus on website
refresh and Microsoft Copilot.
Green
The workforce has the skills, flexibility, and capacity to deliver the council’s priorities
Action Measures Comments/ Progress Status
Monitor progress on
actions associated with
Strategic Workforce
Plans
Report progress on Strategic Workforce Plans to Committee
on an annual basis
The 'Council Workforce Strategy and Plan 2025 to 2027' was reported
to Executive Committee on 28 May 2025.
Resource Workforce Plans were reported to the respective Resource
Committees in September and October 2025.
Green
Page 8
77

Page 78

78

Page 79

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Treasury Management Activity – 2025/2026 Second
Quarter Review 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a second quarter review of Treasury Management Activity for 2025/2026
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted.
[1recs]
3. Background
3.1 In order to provide members with information on the Council’s Treasury Management
activities, a quarterly report is presented to this Committee.  This report covers the
period 1 April 2025 to 30 September 2025. 
4. Market Performance
4.1. At the time of writing the base rate was 4.00% and the Bank of England Asset
Purchase Programme (commonly referred to as its policy of quantitative easing) was
£555bn.  The Council’s Treasury Management Advisers are forecasting that the
base rate is likely to be cut to 3.75% in February 2026. 
5. Debt Management and Borrowing Strategy
5.1. The Council began the year with debt of £1,030.762 million with fixed rate loans from
the Public Works Loans Board (PWLB) making up 94.32% of the debt. 
5.2. Table 1 shows the movement in borrowing from 1 April 2025 to 30 September 2025.   
Table 1 – Movement in Borrowing to 30 September 2025 
Balance as
at
01/04/2025
£m 
New
Borrowing
£m 
Debt
Maturing
£m 
Debt
Repaid
£m 
Balance as
at
30/09/2025
£m
Increase/
Decrease
in
Borrowing
£m
Short Term
Borrowing 170.153 87.500 (196.436) 0.00 61.217 (108.936)
Long Term Borrowing 860.609 0.000 0.00 0.00 860.609 0.000
TOTAL
BORROWING 1,030.762 87.500 (196.436) 0.00 921.826 (108.936)  
9
79

Page 80

5.3. Short term borrowing reflects borrowing which will mature in the coming year, or
where the debt can be recalled in the coming year. 
5.4. In 2012/2013, HM Treasury introduced a “certainty rate” to enable eligible local
authorities to access cheaper PWLB funding, with a 20-basis point (0.20%) reduction
on the standard rate.  South Lanarkshire Council has access to this reduced rate. 
5.5. The Council has an expected borrowing requirement of £400.567 million for
2025/2026 including £237.667 million carried over from 2024/2025.  It is expected
that only £232.325 million of borrowing will actually need to be taken in 2025/2026. 
5.6. The Executive Director (Finance and Corporate Resources), under delegated
powers, will continue to take the most appropriate form of borrowing depending on
the prevailing interest rates at the time, taking into consideration the differential
between investment earnings and debt costs that remains high. 
5.7. No borrowing has been taken so far in the current financial year.  Instead, cash
balances have been used to fund capital spend.  Borrowing to replace these
balances will be required going forward. 
6. Investment Activity
6.1. On a daily basis, the Treasury Management section within Finance and Corporate
Resources manages the Council’s cash balances.  These balances can result from
day-to-day cash flow situations where income has been received before expenditure
has taken place, and from the balances held in earmarked reserves for use at a later
date.  It is the responsibility of the section to manage these funds.  The primary
consideration when making deposits is the security of funds.  Secondary to this,
consideration is given to ensuring we have access to funds when necessary, and
that these funds are working as well as they can for the Council. 
6.2. The Prudential Indicators, Treasury Management Strategy and Annual Investment
Strategy Report for 2025/2026 was approved by South Lanarkshire Council on
26 February 2025.  This included details of permitted investments for the Council. 
6.3. Prior to depositing funds with any bank or building society, checks are made with the
Council’s treasury adviser, Link Asset Services, that the institution is considered safe
and that any deposit conforms to their recommended time duration as determined by
their Rating Methodology.  This methodology uses credit ratings, rating watches and
outlooks and credit default swap (CDS) prices to establish a suggested time duration
for deposits. 
6.4. Deposits made in the period 1 April 2025 to 30 September 2025 totalled
£1,045.184 million.  This is the cumulative deposits placed over this period.  This is
broken down per sector and institution in Table 2. 92.56% of these deposits were
made with the UK Government through the Debt Management Office (DMO) deposit
facility. 
6.5. In order to manage their cash flow over the short term, local authorities, as part of
normal treasury management activity, will place money on deposit with other local
authorities.  Deposits placed with other local authorities account for 6.09% of
deposits.  The remaining 1.35% was placed in instant access call accounts with
Bank of Scotland. 
80

Page 81

Table 2 – Investment Activity 1 April 2025 to 30 September 2025 
Counterparty
Deposit
Totals (£m)
% of
Total
Deposits
Average
Interest
Rate
Deposits in UK Government   
Debt Management Account Deposit
Facility 967.390 92.56% 4.20%
Total Deposits in UK Government 967.390 92.56% 4.20%    
Deposits in UK Local Authorities 63.700 6.09% 4.13%    
Deposits in UK Banks and Building
Societies:   
Bank of Scotland 14.094 1.35% 4.26%
Total Deposits in UK Banks and
Building Societies 14.094 1.35% 4.26%
Total Deposits 01/04/2025 to 30/09/2025 1,045.184 100.00% 4.20% 
6.6. The average interest rates achieved from the deposits are also shown in Table 2. 
Interest rates achievable for deposits have been falling since the Bank of England
began a series of interest rate cuts. 
6.7. Actual deposits as at 30 September 2025 totalled £61.846 million. 
7. Management of Risk
7.1. It is recognised that no Treasury Management activity is without risk and practices
are put in place in order to limit risk.  As noted in section 6.2, the Treasury
Management Strategy was approved in February 2025 and set a framework for
Treasury Management activities in 2025/2026.  It also set limits on debt and
investments in order to mitigate risks. 
7.2. The Annual Investment Strategy for 2025/2026, also approved in February 2025,
included details on how risk would be managed for all permitted investments.  This
included criteria for placing deposits with the Debt Management Office (DMO), UK
Local Authorities, Banks and Building Societies and Money Market Funds. 
7.3. Part of the criteria for counterparties is meeting minimum credit ratings with the three
main rating agencies.  A credit rating evaluates the credit worthiness of an
organisation.  It is an evaluation made by a credit rating agency of the organisation’s
ability to pay back the debt and the likelihood of default. 
7.4. Tables 3 to 5 show a breakdown of deposits with details of the credit ratings of banks
and building societies used from 1 April 2025 to 30 September 2025. Deposits with
the DMO are with the UK Government and so have a rating equivalent to the UK’s
sovereign rating.  Deposits with local authorities are considered to be of very high
credit quality. 
81

Page 82

Table 3 – Fitch Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA-) 967.390m 92.56%
Deposits with Local Authorities 63.700m 6.09%
AA- F1+ 14.094m 1.35%
Total  1,045.184m 100.00% 
Table 4 – Moody’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (Aa3) 967.390m 92.56%
Deposits with Local Authorities 63.700m 6.09%
A1 P-1 14.094m 1.35%
Total  1,045.184m 100.00% 
Table 5 – Standard and Poor’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA) 967.390m 92.56%
Deposits with Local Authorities 63.700m 6.09%
A+ A-1 14.094m 1.35%
Total  1,045.184m 100.00% 
7.5. The tables above show that 98.65% of deposits were made with counterparties of
very high credit quality (DMO/UK Government and other local authorities).  The
remaining 1.35% were deposits in instant access accounts with Bank of Scotland. 
7.6. The graph at Appendix 1 shows the duration of deposits made from 1 April 2025 to
30 September 2025.  The graph shows that, since 1 April 2025, all deposits have
been made for 1 year or less.  The maximum maturity period of 61 days was for a
deposit of £15.000 million to a local authority. 
8. Next Quarter Investment Plans
8.1. The current investment framework will be continued in the next quarter.  Deposits will
continue to be placed with the institutions where their ratings are consistent with the
Council’s approved criteria.  Deposits will also continue to be placed with the DMO
and UK local authorities. 
8.2. Treasury Bills will be used when they return a higher yield than deposits in the DMO
for the same, very low risk. 
8.3. We will continue to work with our Treasury Management Advisers, Link, to ensure
we gain all information available on counterparties before any deposits are made. 
82

Page 83

9. Treasury Management Indicators
9.1. The purpose of these indicators is to contain the activity of the treasury function
within certain limits, thereby managing risk and reducing the impact of an adverse
movement in interest rates.  However, if these are set to restrictive limits, they will
impair the opportunities to reduce costs/improve performance.  The indicators are
detailed in sections 9.2 to 9.5. 
9.2. Limits for External Debt: The operational and authorised limits for external debt for
2025/2026 were set in the Prudential Indicators, Treasury Management Strategy and
Annual Investment Strategy 2025/2026 approved by South Lanarkshire Council on
24 February 2025.  These are shown in Table 6, along with a column showing the
difference between the actual debt level and the limits (headroom). 
Table 6 – Limits for External Debt 
Estimate as
per 2025/26
Strategy
Minimum
Headroom
to Limits in
period
Headroom
as at
30/09/2025 
£m £m £m
Operational Limit for external debt 1,570.000 451.738 648.174
Authorised Limit for external debt 1,590.000 471.738 668.174 
9.3. The indicator shows that we have not breached the operational and authorised limits
to 30 September 2025.  There has been a minimum level of headroom of
£471.738 million between actual and authorised level for external debt in the period
to 30 September 2025. 
9.4. Limits on Maturity Structure: By setting limits on the maturity structure of
borrowing, the exposure to large concentrations of debt needing to be replaced at
the same time in the future at currently unknown rates can be limited.  This
effectively places a limit on exposure to longer term interest rate movement. This is
shown in Table 7. 
Table 7 – Limits on Maturity Structure 
Maturity Structure of Borrowing  
Upper
Limit 
Lower
Limit
Maximum
for period
to 30/09/25 
Actuals as
at 30/09/25
Under 12 months 30% 0% 23.04% 9.90%
12 months and 24 months 40% 0% 7.12% 4.35%
24 months and 5 years 50% 0% 23.16% 23.16%
5 years and 10 years 60% 0% 22.06% 22.06%
10 years and 20 years 60% 0% 3.57% 3.57%
20 years and 30 years 70% 0% 26.19% 26.19%
30 years and 40 years 80% 0% 10.77% 10.77%
40 years and 50 years 90% 0% 0.00% 0.00%
50 years and above 90% 0% 0.00% 0.00% 
9.5. The indicator shows that the upper limits for all maturity profiles have not been
breached to 30 September 2025.  
83

Page 84

10. Employee Implications
10.1. There are no employee implications. 
11. Financial Implications
11.1. The current rate of interest receivable remains relatively low but has increased over
recent months.  Any deposit interest received offsets Loan Charges made to the
Council’s Revenue budget. 
11.2. The costs of borrowing for capital expenditure have been built into the long-term
Revenue Budget Strategy. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no implications for climate change or sustainability in terms of the
information contained in this report. 
12.2. There is also no requirement to carry out an environmental impact assessment in
terms of the information contained within this report. 
13. Other Implications (Including Environmental and Risk Issues)
13.1. Section 7 of this report provides details of how investment risk is managed. 
14. Integrated Impact Assessment and Consultation Requirements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
14.2. There is no requirement to carry out any consultation in terms of the information
provided in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
11 November 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References 
 Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy
2025/2026, South Lanarkshire Council, 26 February 2025
 Treasury Management Activity – 2025/2026 First Quarter Review, Finance and
Corporate Resources Committee, 10 September 2025  
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
84

Page 85

Appendix 1
85

Page 86

86

Page 87

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Collection and Approval for Write Offs 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise Committee of revenue collection performance for financial year 2025/2026
to 30 September 2025
 advise Committee of the position regarding the Non-Domestic Rates
Incentivisation Scheme (NDRIS) for financial year 2025/2026 
 seek approval for write offs 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that performance in the collection of revenue be noted;
(2) that the current position in respect of NDRIS be noted; and
(3) that write offs for the following be approved:-
 Council Tax  £1,858,035.42
 Non-Domestic Rates £436,650.78
 BID Levy £1,592.16
 Sundry Debt  £290,966.05
 Housing Rent and associated charges                £388,880.60  
3. Background
3.1. Responsibility for the collection of Council Tax, Non-Domestic Rates (NDR) and
Sundry Debt is the responsibility of Finance and Corporate Resources.  This report
and the attached appendix provide information on collection performance and
proposals for write off. 
4. Current Collection Performance
4.1. The first table in Appendix 1 presents the collection performance for Council Tax,
NDR and Sundry Debts for financial year 2025/2026. 
4.2. The annual Council Tax collection target for 2025/2026 has been set at 95.6%.
Council Tax collection is currently 60.31%, ahead of target by 0.05% and ahead of
comparable performance in 2024/2025 by 0.12%. 
4.3. A Non-Domestic Rates (NDR) collection target of 97.6% has been set for 2025/2026.
NDR collection is currently 48.0%, ahead of target by 0.1% and behind comparable
performance in 2024/2025 by 0.7%. The reduction in comparable performance is
due to the profile of payments received in comparison with the same period last year. 
10
87

Page 88

4.4. The 2025/2026 annual target for Sundry Debt collection has been set at 97.5%.
Sundry Debt collection to 30 September 2025 was 97.1%, behind target by 0.4% and
behind comparable performance in 2024/25 by 0.4%. 
5. Arrears Collection Performance
5.1. Arrears collection performance for Council Tax, NDR and Sundry Debt is presented
in the second table of Appendix 1. 
5.2. The 2025/2026 arrears annual target for Council Tax has been set at £3.000 million,
with collection to 30 September 2025 of £2.016 million, ahead of target by
£0.123 million (4.1%) and behind comparable performance in 2024/2025 by
£0.198 million. 
5.3. The 2025/2026 arrears target for NDR has been set at £2.000 million, with collection
to 30 September 2025 of £1.739 million, ahead of target by £0.141 million (7.1%)
and behind comparable performance in 2024/2025 by £1.198 million. 
5.4. The 2025/2026 arrears target for Sundry Debt was set at £14.076 million, with
collection to 30 September 2025 of £11.673 million, equal to target and ahead of
comparable performance in 2024/2025 by £5.622 million. 
6. Non-Domestic Rates Incentivisation Scheme
6.1. The Non-Domestic Rates Incentivisation Scheme (NDRIS), formally known as the
Business Rates Incentivisation Scheme is a Scottish Government initiative to
incentivise growth of the local business tax base, with a view to increasing NDR
income yields. 
6.2. The Scottish Government sets annual targets for growth (buoyancy) and Councils
who achieve their target retain 50% of the additional income generated above the
target.  The buoyancy target is a measure of the increase in the total rateable value
of the non-domestic properties on the Valuation Roll (including certain categories of
public undertakings). 
6.3. The provisional buoyancy target for South Lanarkshire Council in 2025/2026 has
been set by the Scottish Government at 0.9%.  This is a measure of the increase in
the total rateable value of the non-domestic properties on the Valuation Roll
(including certain categories of public undertakings). 
6.4. Performance against the NDRIS target will be reported to Committee on a quarterly
basis.  Buoyancy to the end of September 2025, was -0.17%. 
6.5. The tax base must achieve growth of more than 1.07% during the remaining two
quarters of the financial year to secure additional income under the scheme. 
7. Proposals for Write Off
7.1. Approval for write off of the following irrecoverable debts is requested from
Committee.  The Council has the power to write off accounts where the debtor is
deceased, sequestrated, in liquidation or the debt is prescribed or where the debt is
deemed uneconomical to pursue. 
7.2. The proposed write off of Council Tax accounts dating from 1993/1994 to 2025/2026
totals £1,858,035.42 relating mainly to prescribed debt, sequestrations and estates
of the deceased.  This includes the bulk write off of prescribed debt for financial year
2003/2004. 
88

Page 89

7.3. The value of accounts currently marked for write off in the Non-Domestic Rates
system from rating years 2023/2024 to 2025/2026 totals £436,650.78.  These debts
are deemed to be irrecoverable because the debtor is in liquidation, has ceased
trading or has been sequestrated. 
7.4. Approval is sought for the write off of Business Improvement District (BID) Levies
totalling £1,592.16, administered by the Council on behalf of the Hamilton, Carluke
and Lanark BID companies.  There is no financial impact on the Council for these
write offs. 
7.5. Following consultation and agreement with Resources, the proposed write off of
Sundry Debt totals £290,966.05.  Appendix 2 provides a breakdown of the proposed
write-off over categories. 
7.6. Approval is sought for the write off of former tenant rent arrears of £385,709.99
(including bulk write offs for financial year 2025/2026 Q2 for temporary
accommodation) and Housing Benefit Overpayments of £3,170.61. 
7.7. A full list of all debts proposed for write off is held by the Executive Director (Finance
and Corporate Resources). 
8. Employee Implications
8.1. None. 
9. Financial Implications
9.1. Provision has been made for the financial impact of all write offs. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
11. Other Implications
11.1. The main risk associated with the Council’s revenue collection is a failure to monitor
collection rates and take effective corrective action where required, resulting in a
significant reduction in collection performance and Council funding.  The risk is
managed through monthly performance reporting and review of performance at
monthly Senior Management Meetings. 
11.2. There are no implications for sustainability in terms of the information contained in
this report. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
12.2. There is also no requirement to undertake any consultation in terms of the                                                      
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
28 October 2025 
89

Page 90

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Finance and Corporate Resources Committee – 10 September 2025 
List of Background Papers
 System Reports from Council Tax, Non-Domestic Rates, Sundry Debt and Academy
Housing 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
90

Page 91

Appendix 1        
SOUTH LANARKSHIRE COUNCIL        
REVENUES COLLECTION        
FOR PERIOD ENDING 30 SEPTEMBER 2025         
Annual Budget           
Cash Target  Actual Variance   % Variance   
Budget to 30/09/25 to 30/09/25 to 30/09/25   to  Notes 
£000's £000's £000's £000's    annual budget          
FINANCIAL YEAR 2025/2026       
Council Tax 168,413  106,157   106,245   88 over 0.05% 
Non-Domestic Rates 392,293     192,529     192,920         391 over 0.1% 
Sundry Debt 122,016     122,016  121,497  (519) under -0.4% 
ARREARS        
Council Tax 3,000  1,893 2,016   123 over  4.1% 
Non-Domestic Rates 2,000    1,598  1,739         141 over 7.1% 
Sundry Debt       14,076       11,669       11,673             4        over          0.0% 
91

Page 92

Appendix 2 
BREAKDOWN OF PROPOSED
SUNDRY DEBT WRITE-OFF 
Resource Service No. of Accounts Value (£)
Housing & Technical Property Services / H&T General /
Estates (Commercial Rent) 
53                 37,204.72 
Rechargeable Repairs / Capital
Repairs 
471               164,083.37
Community and Enterprise /
Education
Bereavement / Care of Gardens /
Waste / Education General
27                 51,290.54
Finance & Corporate  Housing Benefit Overpayments / 
IT 
4                   2,514.87
Social Work Alert Community Alarm Service /
Non-Residential 
338 35,872.55 
Total 893 290,966.05 
92

Page 93

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date: 19 November 2025
Prepared by: Executive Director (Finance and Corporate Resources) 
Subject: Procurement Service – Establishment Posts 
1. Purpose of the report
1.1. The purpose of the report is to:- 
 update Committee on the current workload in the Procurement service
 seek approval to be add 2 additional trainee procurement officer posts to the
establishment on a permanent basis and 1 trainee procurement officer post on a
temporary basis to help address workload demands 
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the need to permanently increase the resources available to support
procurement activity be noted;
(2) that the proposal to increase the procurement establishment by 2 FTE trainee
procurement officer posts, be approved;and
(3) that the proposal to add 1 FTE temporary procurement officer post, be approved. 
3. Background
3.1.  The Council operates a largely centralised procurement service delivering the
following core functions:- 
 management of the procurement workplan, including contract renewals,
extensions and responding to new requirements
 assisting Resources with scoping procurement requirement and identification of
appropriate routes to market
 managing the delivery of tenders covering initial publication, responding to
clarifications from potential bidders, evaluation and contract award
 ensuring compliance with procurement regulations and standing orders on
contracts
 delivery of the Council’s procurement strategy and reporting requirements,
including the Annual Procurement Report and reporting to committee on contract
awards 
3.2. The workload of the Procurement team continues to increase. In 2024/2025, a total of
232 awards over £50,000 were made, in comparison to 207 in 2023/2024 and 175 in
2022/2023, representing a cumulative increase of 33%.  Total awards in 2024/2025,
including non-regulated contracts under £50,000, totalled 473 contracts. 
11
93

Page 94

3.3. The increased demand for tendering activity arises from Resource procurement
requirements to meet the Council’s strategic objectives, including investment
programmes, regeneration and external funding and ongoing efforts to improve
contractual compliance.  The complexity of procurement projects, particularly in
respect of externally funded projects, has also increased. 
4. Procurement Staffing Support 
4.1. Due to wider recruitment pressures in the procurement market, the Council has
invested in an extensive trainee procurement programme, and as a result the current
structure of the team is heavily weighted towards trainee procurement officers.  This
programme has been successful in attracting staff with broad experience and assisting
with workforce planning; however, the retention of officers can be challenging. 
4.2. Trainee procurement officers provide a critical role in supporting Resource
procurement priorities, both conducting competitive processes and ensuring
compliance with Council Standing Orders on Contracts. 
4.3. Trainees quickly take on responsibility for lower value procurement projects as a
platform for supporting more complex work.  A key component of the trainee
programme is the provision of professional training to allow trainees to qualify with the
Certified Institute of Procurement and Supply (CIPS). 
4.4. There are currently 13 trainee procurement officers in post (excluding the 2 temporary
positions) as part of an overall procurement team establishment of 23 FTEs. 
4.5. 2 temporary positions were added to the structure in 2024 for a period of 18 months.
The 2 temporary members of staff have made good progress within their training
cohort in progressing lower value procurements, including mini competitions and direct
awards and will, in time, progress towards more complex open tenders and framework
arrangements. 
5. Proposal 
5.1. It is proposed the 2 temporary trainee procurement officer posts (Grade 2) are
converted to permanent posts within the Procurement structure to secure longer term
capacity and 1 trainee procurement officer post is added on a temporary basis for a
period of 18 months to provide additional workload capacity over the short term. 
6. Employee Implications
6.1. It is proposed that the following posts are added to the establishment of the
Procurement team on a permanent basis as detailed below:- 
Post title Number
of
posts
Grade /
SCP
Hourly
Rate
Annual
salary
(excluding
on-costs)
Gross
salary
(including
on-costs
30.3%)
Total 
Trainee
Procurement
Officer
2 G2,
Level 2-
4
£16.54
-
£20.53
£30,183.85
-
£37,465.20
£39,329.56
– 
£48,817.16
£78,659.12
-
£97,634,32 
Thes
These posts have been evaluated using the Council’s grading scheme. 
94

Page 95

6.2. The 1 FTE temporary post will be graded at the same level as the permanent posts. 
7. Financial Implications
7.1. The cost of the two temporary posts is currently being met from existing resources in
Finance and Corporate Resources, therefore there are no direct financial implications. 
7.2. The cost of the new temporary post will be met by a contribution from Housing and
Technical Resources given the volume of procurement work that is undertaken and
planned with the Resource. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. There is a risk that the delivery of the council’s strategic priorities is significantly
impacted by the increasing levels of procurement activity. The adding of two trainee
procurement officer posts to the establishment on a permanent basis will safeguard
the capacity of the service allowing it to continue to support the delivery of the strategic
priorities of the Council. This will be further enhanced by an additional temporary
trainee post. 
10. Integrated Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required. 
10.2. There is not a requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
95

Page 96

96

Page 97

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Consultation on Changes to the Local Government
Pension Scheme (Scotland) Regulations 2018 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide an update on the Scottish Public Pensions Authority consultation on the
proposal to change the local government pension scheme (Scotland) regulations
(2018)
 provide an update on the approach to responding to the consultation 
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted; and
(2) that the proposed response be approved for submission to the Scottish Public
Pensions Authority by the deadline of 25 November 2025. 
3. Background
3.1. The Local Government Pension Scheme (LGPS) continues to be an integral part of
the remuneration package for local government and chief officers in Scotland.  The
Scheme offers the security of a guaranteed income in every year of retirement for all
its members, on some of the most generous terms available from a pension scheme. 
3.2. Membership of the scheme is provided for individuals who are employed by a
participating employer, where they are between the ages of 16 and 75.  By law, all
employees joining the council are contractually enrolled from their first day of
employment and can opt out of the scheme if they wish.  A 50:50 scheme is also
available for employees who wish to save for their retirement, but in a reduced
capacity. 
4. Consultation on the changes to the local government pension scheme
(Scotland) regulations (2018)
4.1. The purpose of the consultation is to seek views on changes to the local government
pension scheme (Scotland) regulations (2018) which are intended to bring the
Scottish scheme in line with the LGPS in England and Wales and Northern Ireland.  
The amendments also cover a number of proposals in relation to pension benefits for
scheme members and technical amendments to the regulations.  
12
97

Page 98

4.2. This consultation seeks views on the proposed changes and runs from 2 September
to 25 November 2025.  The consultation questions are detailed in Appendix 1. 
4.3. The consultation proposals and questions are published on SPPA’s website.  There
are a number of proposals which impact upon the Council, and it’s LGPS members,
and the key proposals are noted below:- 
 Death grants - remove the upper age limit of 75 for death grants from the
regulations backdated to 6 April 2011. 
 Gender pension gap - A number of proposals have been made in recognition
that information on the gender pension and pension saving gap is not routinely
gathered, however it is acknowledged that membership of the LGPS (Scotland) is
around 69% female and in general women accrue a lower pension than their
male counterparts. 
To this end, a number of proposed amendments have been made as follows (1)
all authorised unpaid absences over 30 days should be automatically
pensionable (2) the time limit for buying back unpaid leave pension absences
increases from 30 days to 1 year or when the employment ends (3) gender pay
gap reporting should be mandatory for employers with over 100 employees. 
 Child related leave: 
pensions during additional maternity and adoption leave - the definition of
child related leave is changed to include periods of additional maternity, adoption
and shared parental leave when on reduced pay with the contribution cost being
met by LGPS employers. 
bereaved paternity leave and neonatal care leave - an update to the
regulations is proposed to take account of recent legislation changes in regard to
these statutory leave types. 
 Opt outs/participation rates - to mandate the collection and reporting of opt-out
data including opt-out reason in addition to details of profession type, working
hours, salary, gender, age, ethnicity, marital status and dependants. 
 Forfeiture - removing the 3-month timescale for an employer to make a forfeiture
application to bring it in line with other public sector pension scheme regulations. 
 Employment relating to the provision of education - transitional regulations
relating to certain postholders in Education who can now remain in the LGPS
until they leave their post (in light of recent amendments to the STPS regulations
regarding posts where eligibility for STPS membership was unclear.) 
4.4.  Additional proposals to tidy up or re-align the regulations from a technical
perspective cover the areas below:- 
 McCloud Remedy
 Survivor benefits
 Club transfers and transfers from other public service scheme for members over
65 years old
 Lifetime allowance
 Children’s pensions 
98

Page 99

 Removal of references to EU law
 Consolidation of civilian Scottish Fire and Rescue pension members from
regional schemes into Strathclyde Pension Fund
 Concurrent membership aggregation. 
5. Proposed South Lanarkshire Council Response
5.1. In relation to the points highlighted in section 4.3, the Council is supportive of the
proposals which are intended to address, in practical terms, the fairness and equality
issues linked to known pensions gaps linked to gender and other demographic
characteristics of scheme members.  The Council also welcomes the steps being
taken to gather information on opt-outs, participation rates, and the amendments
designed to address inequalities and ensure fairer outcomes for all members 
It is likely that some of these measures will have the potential to bring an additional
financial impact on the Council.  The consultation document does not, however,
provide sufficient technical detail on a number of the consultation points to draw
distinct conclusions in relation to the financial implications.  These points will be
highlighted in the Council’s consultation response and further clarification requested. 
5.2. The proposed measures listed at section 4.4, to simplify scheme administration and
reduce complexity by aligning the Scottish scheme with UK-wide standards, are also
viewed by the Council as sensible and advantageous. 
5.3. The biggest area of financial impact relates to the proposals linked to child-related
leave.  Currently the employer and employee pension contributions are paid on
occupational and statutory maternity pay, however no contributions are made in
respect of the periods of no pay.  The Scottish Government is proposing that
employers automatically pay contributions (at the member’s normal rate of pay
immediately before the additional leave began) in respect of the final 26 weeks
maternity, adoption or shared parental leave, resulting in reduced or no pay.  Under
the current regulations, employers do not pay contributions on the final 13 weeks of
no pay during this period. 
6.  Next Steps
6.1. The Council’s consultation response will be submitted before the deadline of 25
November 2025. 
7.  Employee implications
7.1. There are employee implications associated with this consultation, as the proposals
are intended to have a positive impact on the pension benefits of members by
addressing recognised gender pay gap inequalities and simplifying the regulations. 
8.  Financial implications
8.1.   Some of the proposals are high-level and therefore do not contain the required
technical detail to allow robust conclusions to be drawn on the full financial
implications; particularly relating to the gender pensions gap and family leave
(maternity and adoption). 
8.2. In terms of the proposal that all authorised unpaid absences over 30 days should be
automatically pensionable; based on an analysis of information for the period August
2024 to September 2025 less than 10 local government employees were granted
special leave of over 30 days in duration; based on these numbers the estimated
cost of this change would be in the region of £980 per year.  However, it should be  
99

Page 100

noted that the employer pension contribution rate is expected to increase at the next
pension scheme triennial revaluation in 2026, therefore this projected employer cost
would be likely to increase.
8.3. It should also be noted that this proposal does not state whether career breaks,
which meet the definition of authorised unpaid leave as stated in the consultation
document, would fall into this classification.  If this were the intention, the proposal
would incur a more significant financial consequence for the Council, as 98 local
government career breaks were granted and took effect in the period August 2024 to
September 2025.  The Council would not agree to the inclusion of career breaks
under this proposal.
8.4. The financial implications of making employer pension contributions linked to periods
of reduced or no pay linked to additional maternity, adoption or shared parental leave
are expected to be more significant for the Council. 
8.5. Based on an analysis of information for the period August 20204 to September 2025
the additional employer costs are estimated to be in the region of £70,013 per year. 
Again, it should be noted that the expected increase to the employer pension
contribution rates in 2026 would be likely to result in an increase to this estimated
cost. 
8.6. The overall estimated additional annual costs of these changes are approximately
£71,000, however an increase in the number of leave requests or pension
contribution rates would result in increased costs.  When more information has been
shared on these proposals, a further assessment of the financial impact can be
undertaken, in the event that the proposals are accepted by the Scottish
Government.
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no climate change, sustainability or environment implications arising from
this report. 
10. Other Implications
10.1. There are no other implications as a result of this report 
11. Integrated Impact Assessments and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, and therefore no impact assessment is required. 
11.2. The trade unions have been advised of this consultation. 
Jackie Taylor
Executive Director 
29 October 2025  
100

Page 101

Links to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Excellent employer 
Previous Reference
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Michelle Milne, Head of Personnel Services
Ext:4330 (Tel: 01698 454330)
E-mail: michelle.milne@southlanarkshire.gov.uk 
101

Page 102

Appendix 1 Council’s response to the Scottish Government Consultation 
Changes to the LGPS (Scotland) (2018) regulations
Q1. Do you have any comments on Scottish Ministers’ proposals to remove the
upper age limit of 75 for death grants from the LGPS Regulations, backdated to 6
April 2011?
• The council is supportive of this proposal. 
Q2. Do you agree that all authorised unpaid absences over 30 days should be
automatically pensionable?
• The council is supportive of this proposal in part, but does not agree that all
categories of authorised unpaid absences over 30 days should be automatically
pensionable.  The Council is of the view that only certain categories of unpaid leave
over 30 days should be pensionable including family, caring, health related leave. 
However, authorised paid leave in respect of national, public and community, country
and overseas service and other events extending over 30 days should not be
pensionable as these are voluntary and decisions are made on a personal choice. 
The Council does not agree that these categories of leave should be pensionable. 
Furthermore, it is not clear whether the intention of the proposal is for Career Breaks
to be covered by this proposal.  The Council is of the view that Career Breaks should
not be covered by this proposal and should remain unpensionable as they are
voluntary and decisions are made on a personal choice.  Should this be the case,
significant additional costs will be incurred by employers and currently there is no
financial provision for this.  Further clarification of this point is required in terms of the
proposal.
Q3. Do you agree with the proposal to change the time-limit for buying back
unpaid leave pension absences from 30 days to 1 year, or when the employment
ends?
• The council is supportive of this proposal in principle, but clarity is needed on the
position regarding interest on pension that is bought back.  Under the current
regulations this is not incurred, and confirmation would be helpful on whether this
arrangement will continue.  Notwithstanding this point, if addressing the gender pay
gap properly it would make sense for employees to have until their employment ends
to decide whether to buy back any lost pension contributions rather than a one year
time limit.  It is possible that, in the first year after a period of no pay, the employee’s
financial circumstances are relatively unchanged thus they are unable to benefit from
this option.  They may be in an improved financial position at a later point in their
career and therefore be in a better financial position to take advantage of this and
begin to make contributions in respect of the previous period of lost contributions. 
Q4. Do you agree with updating the definition of child-related leave to include all
periods of additional maternity, additional adoption and shared parental leave when
on reduced or no pay?
• The council is supportive of this proposal in principle, however clarification is
required on how this would work in practice.  Is this proposed change an extension
to the current arrangements for Assumed Pensionable Pay (as cited in section 11 of
the LGPS 2015  HR guidance) in that it will now include the 13 week period of
unpaid leave?  Or would the new proposal introduce the requirement for employers
102

Page 103

to pay both the lost employee and employer contributions associated with the period
of no pay?  Further clarification of the proposed arrangements should be made clear,
in terms of both of these clarification points, so that the full financial impact can be
properly assessed and provision made. 
Q5. Do you agree that the contribution cost of this should be met by LGPS
employers?
• Whilst this proposal is likely to bring significant financial implications for employers,
the Council is supportive of this proposal in principle.  Further clarification is needed
on whether the intention of this change is that employers will also be required to pay
the employee contributions in addition to the employer contributions in respect of this
leave.
Q6. Do you agree that gender pension gap reporting should be mandatory in the
LGPS?
• The council is supportive of this proposal as it brings this matter into line with other
employer statutory reporting requirements.
Q7. Do you agree with the threshold of 100 LGPS members for defining which
employers must report on their gender pension gap?
• The council is of the view that this data should be provided by all employers.
Q8. Do you agree with the definition of ‘gender pension gap’ and ‘gender
pensions savings gap’?
• The council agrees with the definitions provided.
Q9. Do you agree that the annual report is the best method for reporting on
participation and opt out data? 
• The Council agrees with this proposal as it provides a sensible year end approach to
gathering and publishing the data.  Time should be allowed for system and reporting
changes to be implemented (depending on the final requirements) should this
proposal proceed. 
Q10. Do you foresee any issues with Administering Authorities’ ability to gather
data on opt-outs?
• Yes, it is likely to be problematic to gather the information on protected
characteristics.  Employees do not routinely provide this information to their
employer and from experience do not actively keep this up to date when their
circumstances change.  Therefore, it is possible that the information held by
employers has gaps and is not necessarily current. 
Asking members to provide this information when completing the opt out form will
only result in comprehensive accurate details being gathered if the fields are made
mandatory or a full explanation for the reason for gathering the information is
provided.
Clarification is also requested as to whether the intention is for this data to be
returned via iconnect during the end of year return.  If so, system development time
and costs may be incurred for employers linked to the creation of additional fields,
and reports. 
103

Page 104

Q11. When updating the annual report guidance to reflect opt-out data collection,
what information would be most useful to include?
• Information on all protected characteristics should be gathered: gender, age, job title,
pay range, disability, ethnicity, working hours, marital status, length of service with
employer/local government, caring responsibilities, reason for leaving the scheme.
Q12. Do you have any comments on the collection of additional information? 
• As stated at question 10, employers may have the ability to provide some of the
employment related information in respect of this monitoring duty and they may also
be able to provide some other categories of equalities monitoring information
depending on what data they hold (this is often gathered by employers during the
recruitment process).  It is the council’s view that it would be prudent to request
some information from the member on the opt out form to ensure that information
provided is accurate and current.  From experience employees do not always
provide information unless it is mandatory therefore this option should be
considered. 
This proposal may be problematic for employers and may result in additional costs in
terms of system and report development and testing.
Q13. Do you agree that the three-month time limit for an LGPS employer to make
an application for a forfeiture certificate should be removed?  
• Yes, the council agrees with this proposal that aligns these arrangements with other
public pension schemes. 
Q14. Do you agree with or have any comments on these technical remedy
amendments?
• The Council agrees with the proposals in relation to the technical amendments.
Q15. Do you agree with these changes to allow those who left the scheme prior to
1 April 2015 to commute small pensions?
• The council agrees with this proposal.
Q16. Do you agree with the changes proposed to the Lifetime allowance
regulations?
• The Council agrees with these proposed changes.
Q17. Do you agree with the proposed amendments to the Regulations?
• The Council agrees with the proposal to pay refund of contributions after a 5 year
period or before the members 75 birthday.
Q18. Do you agree with adding the definition of ‘local government service’ to
Schedule 1? 
• The Council agrees with the proposal to reinstate the term into the regulations.
Q.19 Do you agree with the change to part 2 of schedule 4 transferring all SFRS
staff to Glasgow City Council?
• The council agrees with this proposal.
Q20. Do you agree to the addition of Neo-natal care to the definition of child
related leave? 
• The Council agrees with this proposal. 
104

Page 105

Q21. Do you agree with the proposed amendment to Regulation 10(8)
• The Council agrees with the proposal to amend regulation 10(8) to align it with
current practise. 
105

Page 106

106

Page 107

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Common Good Update Report – Former Vogue
Building 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of requests for funding from Hamilton Common Good that
cannot be met from the Repairs and Maintenance budget
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the demolition of the former Vogue building, 11 Keith Street, Hamilton at
a cost of up to £0.150 million, be funded from Hamilton Common Good
(Section 4.4), be approved. 
3. Background
3.1. The Common Good is a fund of money/assets and is administered by a Scottish
local authority in respect of each former burgh within the area of the local authority. 
3.2. Common Good property is administered separately from other local authority assets
for accounting purposes.  What the authority can do with the assets is subject to a
system of statutory control.  This control has the potential to limit the extent to which
the authority can dispose of or deal with the asset and on what terms. 
3.3. The Common Good funds held within South Lanarkshire Council are Lanark, Biggar,
Hamilton and Rutherglen.   
3.4. The last Common Good report to this Committee in September 2025 provided
information on status of the former Vogue building which is an asset classified as
Hamilton Common Good.  The report noted that an update would be provided to this
Committee once demolition costs are identified, for approval.  Section 4 provides an
update on this project. 
4. Former Vogue Building 
4.1. As noted in the previous report in September 2025, following the serving of a
Dangerous Building Notice, Listed Building Consent has been sought for the
demolition of the remaining part of the building.   This was subject to a consultation
period which closed on 7 November 2025. 
4.2. No relevant objections have been received and at the time of writing, the Listed
Building application is currently being considered. 
13
107

Page 108

4.3. Alongside this statutory process, a demolition contractor has been selected through
an appropriate procurement process with budgeted costs estimated at
£0.150 million. 
4.4. It is proposed that demolition works up to the value of £0.150 million be funded from
the Hamilton Common Good Fund, and that the building is demolished after all the
required approvals are in place. 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. At the end of 2024/2025, Hamilton Common Good Fund had a cash balance of
£0.775 million held by the Council, and which is readily available to meet
expenditure.  Excluding £0.015 million set aside for planned maintenance and
£0.100 million for the Hamilton Town Square project, there is a balance of
£0.660 million available.  This is available to cover the costs of the demolition of the
former Vogue building. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. There are no other implications. 
9. Integrated Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, and therefore, no impact
assessment is required. 
9.2. The proposed demolition has been subject to a consultation period as required as
part of a Listed Building application.   
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 November 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Common Good Update Report, 21 August 2024
 Common Good Update Report, 11 September 2025 
List of Background Papers
 None 
108

Page 109

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance
Ext:  2601  (Tel:  01698 452601)
E-mail:  lorraine.ohagan@southlanarkshire.gov.uk
109

Page 110

110

Page 111

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Early Retirement, Voluntary Severance and Switch 2 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise on activity related to early retirements, voluntary severances, re-
employment of early retirees and re-deployments with an effective date during the
period 1 October 2024 to 31 March 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that early retirements, voluntary severances, re-employment of early retirees
and redeployment of employees on the Switch 2 register with an effective date
during the period 1 October 2024 to 31 March 2025 be noted.
[1recs]
3. Background
3.1. The Council analyses the number and associated costs of employees being released
through early retirement and voluntary severance.  This report provides information on
the Council’s position for the period 1 October 2024 to 31 March 2025. 
4. Early Retirements (Efficiency of the Service/Voluntary Redundancy) and
Voluntary Severance
4.1. During the period, no early retirements on the grounds of efficiency of the service;
voluntary redundancy or voluntary severance were granted.  This represents no
change compared to the previous 6-month period. 
4.2. The re-employment of those who have been granted early retirement or voluntary
severance is monitored and approved centrally within Personnel Services.  During the
6-month period, no requests for re-employment were made and this represents no
change when compared to the previous 6-month period. 
5. Early Retirements – Ill Health
5.1. The Local Government Pension Scheme (LGPS) regulations allow for 2 tiers of ill-
health retirement in situations where the member’s ill-health or infirmity of mind or body
renders them permanently incapable of discharging efficiently the duties of their
current employment.  Tier 1 relates to members with no reasonable prospect of
obtaining gainful employment before their state pension age.  Tier 2 relates to
members with a reasonable prospect of obtaining gainful employment before their
state pension age.  
14
111

Page 112

5.2. The Scottish Teachers Pension Scheme (STPS) similarly has 2 levels of ill-health
retirement: total incapacity benefits and partial incapacity benefits.  Total incapacity
benefit relates to members who are permanently unable to teach and assessed as
having their ability to carry out any work impaired by more than 90% and this is likely
to be permanent in the future.  Partial incapacity benefit relates to members who are
permanently unable to teach but able to undertake other employment. 
5.3. During the 6-month period, of the 48 ill-health retirement requests made, 33 were
granted under these provisions as shown below and 15 applications resulted in no
award being granted.  Capitalisation costs are not incurred as a result of early
retirement on ill- health grounds. 
Resource  No. of Early Retirements
on ill health grounds
Community and Enterprise 9
Education/ Finance and
Corporate/ Housing and
Technical
13
Social Work 11
Total 33 
5.4. During the period 1 April 2024 to 31 March 2025, the number of ill health retirements
granted decreased by 6 when compared to the previous year.  This decrease is due
to a reduction in the number of employees with medical conditions that met the criteria
for ill health retirement. 
5.5. Annual Trend Analysis 
Annual
Period
1/4/20-
31/3/21
1/4/21-
31/3/22
1/4/22-
31/3/23
1/4/2023-
31/3/24
1/4/2024-
31/03/25
No. of 
ill-health
retirements 
43  46  69  66  60 
6. Switch 2
6.1. Switch 2 is monitored and approved centrally within Personnel Services.  During the
6-month period, 36 employees were redeployed to suitable alternative posts within the
Council as follows:- 
Resource Employees Modern
apprentices
Total
Council Wide 3 0 3
Housing and Technical 2 7 9
Social Work 24 0 24
TOTALS 29 7 36 
6.2. This is an increase of 23 when compared to the same period last year.  Of the
employees matched during the period, 35 were placed in permanent roles and 1 into
a fixed term role.  In line with the Switch 2 policy, employees placed on a fixed term
basis will be matched to a suitable, permanent post when available.  
112

Page 113

6.3. Annual Trend Analysis 
Annual
Period
1/4/20–
31/3/21
1/4/21–
31/3/22
1/4/22–
31/3/23
1/4/23-
31/3/24
1/4/24-
31/3/25
No. of 
Switch 2
matches
43 90 28 30  111 
6.4. During the period 1 April 2024 to 31 March 2025, the number of employees re-
deployed increased by 81 compared to the previous year.  This increase primarily
relates to the decommissioning of residential units within Social Work Resources,
Adults and Older People Services. 
7. Flexible Retirement
7.1. Both the local government and teachers’ pension scheme regulations allow employees
to access their pension benefits whilst continuing to work in a reduced capacity with
their employer’s consent.  In line with the council’s flexible retirement policy, requests
that result in a strain on the fund cost to the Council will not be granted. 
7.2. In line with this policy, flexible retirement, phased retirement, and winding down
applications (from local government employees and teachers respectively) are
approved and monitored centrally within Personnel Services. 
During the 6-month period, 41 requests were approved as detailed below:- 
Resource  Flexible
Retirements
(local
government
employees)
Phased
Retirements/
Winding Down
(teachers)
Community and
Enterprise 8 
Education 7 2
Finance and Corporate 2 
Housing and Technical 8 
Social Work  14 
Total 41 
7.3. The average age of the flexible retirements that were granted during the 6-month
period was 62 years and this is unchanged when compared with the same period
last year. 
7.4. Annual Trend Analysis 
Annual
Period
1/4/20 -
31/3/21
1/4/21-
31/3/22
1/4/22-
31/3/23
1/4/23-
31/3/24
1/4/24-
31/3/25
No. of 
Flexible
Retirements
125 126 128 156 112 
7.5. During the period 1 April 2024 to 31 March 2025, the number of flexible retirements
decreased by 44 compared to the previous year.  This is due in part to an increase in
flexible retirement applications which were not granted due to strain on the fund costs. 
It is anticipated that this trend will continue in future periods.  
113

Page 114

7.6. Flexible retirement refusals are monitored within Personnel Services and 4 requests
with effective dates during the period 1 October 2024 to 31 March 2025, were declined
on a cost basis.  This is an increase of 4 compared to the previous year. 
8. Employee Implications
8.1. Incapability dismissals may have been considered in respect of employees who were
refused ill-health retirement. 
8.2. Due to the implementation of Strathclyde Pension Fund’s revised strain on the fund
calculation on 1 October 2024, early retirements requiring employer consent, such as
flexible retirement applications, are more likely to incur a cost.  In line with the flexible
retirement policy, only applications which are zero cost will be approved and as a
consequence the number of rejections and subsequent appeals is anticipated to
increase. 
9. Financial Implications
9.1. No early exit packages relating to early retirement or voluntary severance were
granted within the period 1 October 2024 to 31 March 2025 therefore no costs were
incurred. 
9.2. During this period, costs of £35,853 were incurred in relation to 24 flexible retirement
applications which were granted or in progress before changes to the strain on the
fund factors took effect on 1 October 2024.  These costs were agreed as part of the
Council’s transitionary arrangements. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no climate change, sustainability or environmental implications. 
11. Other Implications
11.1. The early release of employees across the Council must be properly managed to
minimise the risk of adversely impacting service levels through the loss of vital skills
and experience.  In accordance with agreed policies, the redeployment of employees
through the Switch 2 process continues to be considered. 
11.2. Employees have the right to invoke the internal dispute resolution process if their
application for retirement has not been granted.  Stage 1 appeals which are not upheld
by the Council can be submitted to the Scottish Public Pensions Agency at stage 2
and the Pensions Ombudsman as the final appeal stage.  Should an appeal be upheld
at a later stage in the process, the Council’s original decision may be overturned and
compensation awarded to the employee thus incurring additional costs and potential
reputational damage. 
12. Integrated Impact Assessments and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
114

Page 115

12.2. All releases were in line with agreed policies and procedures.  Consultation took place
with the Trades Unions in respect of Strathclyde Pension Fund’s revised strain on the
fund calculations and Council’s agreed transitionary arrangements. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Excellent Employer
 Accountable, Effective, Efficient and Transparent 
Previous References
 Finance and Corporate Resources Committee 29 January 2025
 Finance and Corporate Resources Committee 22 May 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Danielle Lang, HR Business Manager (Operations)
Ext:  4132 (Tel:  01698 454132)
E-mail:  Danielle.Lang@southlanarkshire.gov.uk 
115

Page 116

116

Page 117

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Statutory Review of Community Council Scheme of
Establishment 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Committee with a proposal for the timing of the next statutory review
of the Scheme for the Establishment of Community Councils 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted;
(2) that it be noted that the next statutory review of the Scheme be commenced in
autumn 2027, following the 2027 Local Government elections; and
(3) that it be noted that this report, and the decision of the Committee, will be
shared with all local elected representatives and all Community Councils. 
[1recs]
3. Background
3.1. The Council currently has arrangements in place for 57 Community Councils.  At the
present time, only 32 are active.  A breakdown of those which are active/inactive is
given in Appendix 1 to this report. 
3.2. The arrangements for Community Councils are regulated by the Council’s Scheme
for the Establishment of Community Councils.  The Council’s Scheme dates from
July 2014 when it was last formally reviewed, albeit minor changes were made in
both September 2018 (voting age lowered from 18 to 16) and December 2020
(scheme amended to permit exclusion of public and press from Community Council
meetings and remove the need for physical attendance).  In terms of the Local
Government (Scotland) Act 1973 (the 1973 Act) the Council shall “from time to time”
and “having regard to changing circumstances and to any representations made to
them” review its Scheme, where it considers that the Scheme ought to be amended. 
The Scheme also states that the Council shall review it “from time to time”. 
3.3. The procedure for reviewing the Scheme is laid down in the 1973 Act, and can be
quite involved, and take around a year to complete, from the time it is commenced to
the time when the new community councils are formed and elections to them held. 
3.4. All decisions on the review of the Scheme must, in terms of the 1973 Act, be taken
by special meetings of the Full Council, with decisions requiring the support of two
thirds of those members present and voting.  In practical terms, special meetings
would be convened on the same date as scheduled Full Council meetings and held
immediately before or after the scheduled meeting. 
15
117

Page 118

4.  Proposals
4.1. A review of the Scheme will consider both the current Community Council areas,
including the number of Community Councils, and the terms of the Scheme itself
which, amongst other things, contains provisions on:- 
 maximum and minimum memberships
 co-option and limits on co-option
 minimum meeting requirements 
 elections
 model Standing Orders and Constitution 
4.2. The Improvement Service has produced a Good Practice Guidance for Community
Councils which covers the process for such a review.  There is also a model scheme
on which the current Scheme is to be based, and which will form the basis for the
review. 
4.3. A possible review timeline, taken from the Best Practice Guidance referred to above,
is included in Appendix 2.  This should be seen as indicative only, as the time taken
for review will vary depending on, among other things, the level of consultation
responses received, and the nature of any changes proposed. 
4.4.  Whilst a Scheme review is not, of itself, a complicated exercise, it involves a high
degree of public engagement, that will likely generate a large amount of community
interest.  At the same time, the Council will want to stimulate interest in those parts of
South Lanarkshire that do not at this time have an established Community Council. 
As noted above, there is no fixed period after which a Scheme should be reviewed. 
The Scheme has not been formally reviewed since 2014, albeit minor changes were
made in September 2018 and December 2020.  In addition, given the work involved
in a statutory review and the elections that would follow it and considering the
scheduled Scottish Parliament and Local Government elections which will be taking
place in May 2026 and May 2027 respectively, there is a need to consider the
potential timings of such a review. 
4.5. Given the above, it is proposed that the next statutory review of the Scheme is
commenced in autumn 2027, following the 2027 Local Government elections.  This
would enable the new Council to shape the review, and see it concluded during a
year in which there are no scheduled electoral events. 
4.6. The Scheme currently provides for 4 yearly elections.  The last set was held in
October 2022, and it is intended that a further set would be held in October 2026,
which would help support the current arrangements continuing until the proposed
review is completed.   
4.7. It is proposed that the details from this report will be shared with all local elected
representatives, including all elected members, and all Community Councils. 
4.8. In advance of a proposal being brought forward to Full Council on how the review is
undertaken, feedback will be sought from Community Councils and local elected
representatives on their views around this, and areas that the review should
specifically consider.  A report will be brought back to this Committee in advance of
that feedback being sought.
118

Page 119

5. Employee Implications
5.1. There are no employee implications from this report. 
6. Financial Implications
6.1. There are no financial implications from this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. There is no need for an integrated impact assessment (IIA) or formal consultation to
be undertaken at this time.  However, an IIA will be undertaken as part of the review
of the Scheme, and there will also be extensive public consultation undertaken. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Fair, open and sustainable
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council of 16 December 2020 and 9 July 2014 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Iain Strachan, Head of Administration and Legal Services
Ext: 4658 (Tel:  01698 454658)
E-mail: iain.strachan@southlanarkshire.gov.uk 
119

Page 120

Appendix 1 – List of Community Councils
No. Name Active at October 2025
1 Royal Burgh of Lanark Yes
2 New Lanark No
3 Lesmahagow Yes
4 Blackwood and Kirkmuirhill No
5 Black Mount Yes
6 Symington Yes
7 Biggar Yes
8 Leadhills Yes
9 Crawford and Elvanfoot No
10 Duneaton Yes
11 Carmichael Yes
12 Pettinain Yes
13 Quothquan and Thankerton Yes
14 Carstairs Yes
15 Carnwath Yes
16 Douglas Yes
17 Rigside and Douglas Water Yes
18 Coalburn Yes
19 Carluke Yes
20 Forth No
21 Tarbrax, Woolfords, Auchengray and
District Yes
22 Calderwood No
23 St Leonards Yes
24 East Mains Yes
25 West Mains No
26 Westwood No
27 Murray No
28 Greenhills and Lindsayfield No
29 Whitehills No
30 Hairmyres No
31 Jackton and Thorntonhall Yes
32 Stewartfield No
33 Auldhouse and Chapelton Yes
34 Strathaven and Glassford Yes
35 Sandford and Upper Avondale Yes
36 Blantyre Yes
37 Burnbank No
38 Hamilton Centre No
39 Whitehill  No
40 Bothwell Yes
41 Uddingston Yes
42 Hillhouse No
43 Udston No
44 Wellhall No
120

Page 121

45 Earnock No
46 Meikle Earnock No
47 Hamilton Centre and Ferniegair No
48 Low Waters No
49 Silvertonhill No
50 Quarter and Cadzow No
51 Lower Clyde Valley No
52 Larkhall Yes
53 Stonehouse Yes
54 Rutherglen Yes
55 Burnside Yes
56 Cambuslang Yes
57 Halfway Yes 
121

Page 122

Appendix 2 – Indicative Review Timetable 
As indicated in the foregoing note, this timeline will vary depending on level of community
response and any changes ultimately proposed. 
Date Event  Description
1. Month 0  Special Council Meeting. 
Both areas and composition and
draft Amended Scheme and
associated documentation. 
As part of a report on the current
Scheme for the Establishment of
Community Councils, Council to
consider a recommendation to amend
the existing Scheme and make a new
Scheme for the Establishment of
Community Councils 
2. Month 0  Publish Public Notice. 
Areas/Composition. 
Give public notice of the Council’s
intention to amend the existing Scheme
and make a new Scheme for the
Establishment of Community Councils.
Period of 8 weeks 
3. Month 3 Special Council Meeting. 
Areas/Composition. 
Council to consider suggestions from the
first consultation period and agree a
Draft Amended Scheme for consultation. 
4. Month 3  Publish Public Notice. 
Draft Amended Scheme and
associated documentation. 
Give public notice of the Council’s Draft
Amended Scheme. Period of 8 weeks
5. Month 6  Special Council Meeting 
Draft Amended Scheme and
associated documentation. 
Council to consider suggestions to the
Draft Amended Scheme and agree a
final Draft Amended Scheme for
consultation. 
6. Month 6  Publish Public Notice. 
Both. 
Give public notice of the Council’s final
Draft Amended Scheme for the
establishment of Community Councils.
Period of 4 weeks 
7. Month 9  Special Council Meeting. 
Both. 
Council to consider suggestions to the
final Draft Amended Scheme; alter if
required; and formally approve the
Amended Scheme. 
8. Month 10  Publish Public Notice. 
Establishment Process/Notice for
currently non-established
Community Council areas. 
Give public notice of the Council’s
Amended Scheme; and invitation to
electors to apply for establishment
(where there is no Community Council
currently in existence). 
122

Page 123

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee 
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject:  Response to Electoral Commission Consultation on
Updated Guidance for Returning Officers: Assistance
with Voting for Disabled People 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the recent consultation launched by the Electoral Commission:
Updated Guidance for Returning Officers – Assistance with voting for disabled
voters
 set out the steps the Returning Officer and his team will take to comply with this
guidance, including current ongoing work to improve accessibility for voters with
disabilities
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) to note the contents of this report and the consultation response at Appendix 1
which was submitted before the consultation closed on 26 October 2025; and 
(2) to note the ongoing work being undertaken by the Returning Officer and his
team as set out in Section 5 of the report.
[1recs]
3. Background and Legislation 
3.1. On 4 August 2025, the Electoral Commission (“the Commission”) launched a
consultation seeking responses from Returning Officers (RO) and their teams, on their
updated guidance on assistance with voting for disabled voters. 
3.2. To help inform the proposed amendments to the current guidance, the Commission
engaged with a range of stakeholders including charity and third-sector organisations
across the whole of the UK.  These organisations represent people with physical and
learning disabilities, mental health conditions and invisible disabilities. 
3.3. The consultation was open until 26 October, and it is intended that responses will
inform further developments of the guidance.  Updated guidance will be published
towards the end of 2025, alongside a full response to the consultation, details of
feedback received and how it has been addressed.  
16
123

Page 124

3.4. Under the Equality Act 2010, ROs have a duty to anticipate the needs of disabled
voters and make reasonable adjustments to remove substantial disadvantage for
those voters.  This means they must take steps to understand and anticipate, on an
ongoing basis, the needs of disabled voters – with different types of disability, support
and access requirements within their area so that they can make informed decisions
about how best to meet these needs by making reasonable adjustments, including
providing appropriate equipment and support.  This includes the selection of polling
venues to ensure accessibility. 
3.5. Under the provisions of the Elections Act 2022, for UK Parliamentary elections, ROs
are required to provide such equipment as is reasonable to enable or make it easier
for disabled people to vote independently and in secret.  The Commission is also
required to provide guidance to support ROs in delivering these changes, which they
must have regard to. 
3.6. Ahead of the Scottish Parliamentary elections in May 2026, the Scottish Government
is introducing legislation via the Scottish Parliament (Elections etc.) (Miscellaneous
Amendments) Order 2025 to align the accessibility provisions for Scottish
Parliamentary elections with the changes introduced by the Elections Act 2022.
Legislation will follow covering local government elections in Scotland. 
4. Consultation and Updated Guidance
4.1. As part of the pre-consultation engagement, organisations and stakeholders were
asked about:- 
 the experiences of disabled voters
 anything they would like to see covered by the guidance or any areas that can be
strengthened
 any amendments to the list of equipment for polling stations that should be
considered
 any examples of good practice 
4.2. The Commission also considered the evidence gathered as part of their monitoring
and evaluation of the four sets of elections which have taken place across the UK
since the changes were first introduced by the Elections Act 2022. 
4.3. The following themes emerged from the pre-consultation engagement:- 
4.3.1. Support for ROs to understand their equality duties
Support is needed to improve RO understanding of their duties under the Equality
Act, including the anticipatory duty.  There also requires to be more proactive work to
understand the needs of voters and the barriers they face when voting in polling
stations. 
4.3.2. Equipment provided in polling stations
Although the list of equipment currently provided was agreed to be helpful to
disabled voters, suggestions were made for additional equipment and support that
could be considered.  For example, further help for blind or partially sighted people
so they can vote independently and in secret with the use of different audio
solutions, and additional guidance for supporting clinically vulnerable voters.  
124

Page 125

4.3.3. Polling station staff support
Polling station staff are not confident nor consistently able to support disabled voters
or voters with health conditions to cast their vote independently and in secret. 
Improved support and training are needed to help polling station staff understand
their role in making voting accessible for disabled voters. 
4.3.4. Communications
Improved communication strategies and approaches are needed to raise awareness
of accessibility support available in polling stations.  Communications to disabled
electors need to be consistently accessible and the approach to engaging and
sharing information with different voters needs to be more inclusive. 
4.4. Changes to Guidance
To address the feedback received, the Commission made a number of changes to
the existing guidance, which forms the basis of the consultation: 
4.4.1. Returning Officer duties  
This section covers the new legislative provisions so that the guidance is applicable
to all polls across the UK.  The wording around the duties of the RO has also been
strengthened, to draw out links to the Public Sector Equality Duty.  The importance
of ROs considering the wide range of equality responsibilities when making
decisions and of being proactive in contacting electors and local groups to support
making informed decisions about the provision of appropriate equipment has also
been highlighted. 
4.4.2. Equipment and support in the polling station 
There have been no changes to the list of equipment that should, as a minimum, be
provided in the polling station, as the evidence from previous polls does not suggest
that changes are needed.  However, in response to feedback received after the 2024
UK General Election and in the pre-consultation engagement work, the list of
equipment and support that ROs may also provide to reference the range of audio
solutions available to blind and partially sighted electors has been updated. 
This now includes:- 
 the provision of a combined audio tactile device
 the provision of recordings of ballot paper details accessed by a QR code or
telephone helpline, either accessed in the polling station or beforehand, used in
conjunction with the tactile voting device, or other equipment 
Specific reference has also been made to the provision of face masks and additional
support that can be provided to clinically vulnerable people when managing any
voter ID requirements in the polling station. 
4.4.3. Staff training 
The guidance has been updated to emphasise the importance of staff being
approachable and professional for voters, and that training needs to specifically
cover what support they can provide to disabled voters, how to use the equipment
that has been provided, and making sure the equipment is readily available for
voters when they come to vote.  
125

Page 126

4.4.4. Public awareness 
The importance of ROs providing information about what help is available in polling
stations has been emphasised, making sure that communications are accessible and
inclusive.  The need for communications plans to be part of both early planning and
post-election review, with a view to continuous improvement, has also been
stressed. 
4.4.5. Resources 
Links to resources to support voters in accessible formats has also been included. 
The Commission have endorsed a range of voter-facing resources by disability
charities including United Response, RNID and RNIB.  These include information on
how to register to vote, the voter ID requirement (where applicable), what to expect
at the polling station, and what support is available to disabled voters throughout the
voting process.  This suite of resources will continue to be updated to support ROs. 
4.5. Consultation Survey
The consultation survey posed a series of yes/no questions to ROs, with the
opportunity to add additional comment should the selected answer be no.  The final
question asked for any other comments on the guidance.  Whilst brief, it provided an
opportunity for ROs to provide any constructive feedback or raise any issues where
compliance would be problematic. 
4.6. The RO team at South Lanarkshire Council took the opportunity to review the
proposed guidance against our existing guidance, and ongoing work, and whilst the
Council’s consultation response was brief, we believe the refreshed guidance is
reasonable, thorough and we do not anticipate any issues in achieving compliance. 
The Council’s response to the consultation can be found at Appendix 1. 
5. Ongoing work to improve voter accessibility 
5.1. In advance of the May 2026 elections and following feedback from voters and staff at
the recent Hamilton, Larkhall and Stonehouse by-election, there are a number of
ongoing initiatives within the Elections Office to improve voter accessibility for
disabled voters, and to ensure compliance with the updated guidance. 
5.2. To support the Council’s commitment to accessibility and inclusivity during the
election period, a British Sign Language (BSL) interpreter will be booked to attend in
person both the pre and post nomination candidate and agent briefing sessions.
Recordings will be available for future reference.  This will help ensure that
information is accessible to all prospective candidates and agents, promote equal
participation in the democratic process and demonstrate good practice in meeting
the diverse needs of our communities. 
5.3. In terms of staff training, there is an ongoing re-write to the training programme
which elections staff undertake, particularly for those who are working at polling
stations.  This new training programme will be delivered face-to-face, to allow staff to
familiarise themselves with the equipment available for disabled voters on polling
day; this can be a concern amongst polling staff themselves, where they do not feel
confident assisting disabled voters.  The polling day guidance will also be updated to
mandate that the equipment should be clearly visible, and not in the polling day bag,
to allow voters or those assisting voters to ask for support should they require it. 
126

Page 127

5.4. A review of the Council’s BSL videos on elections has also been undertaken, to
ensure the content remains fit for purpose.  This review was undertaken in
conjunction with colleagues in the Council’s equality policy team.  Engagement will
continue with this team in the run up to the election to ensure that any other needs of
disabled voters are taken into account. 
5.5. Dialogue is ongoing on a national level, managed by the Electoral Management
Board for Scotland, to develop additional accessibility support for voters.  This
includes a tactile overlay which will provide braille and embossed numbering for
ballot papers, allowing visually impaired voters to vote independently with more
confidence.  The overlay has been trialled successfully by visually impaired users
and refined based on their feedback.  A national telephone support line is also
proposed which will provide audio files for each ballot paper and constituency, with a
dedicated public awareness campaign to promote it, once developed. 
5.6. An interim review of the Council’s Polling Scheme is currently ongoing, the closing
date for consultation responses being 31 October 2025.  As part of this review,
feedback was sought from interested parties, including organisations representing
the disabled, on how accessible the Council’s current polling places are, and
whether there are any barriers to our existing polling places.  A report detailing the
outcome of this review is intended to be presented to Full Council on 10 December
2025. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. There are no financial implications directly arising from this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability and the environment
directly arising from this report. 
9. Other Implications
9.1. There are no implications for risk in terms of the information contained within this
report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
127

Page 128

List of Background Papers
 Guidance for Returning Officers – Assistance with voting for disabled voters 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Nikki Jarvie, Elections Manager and Depute Returning Officer
Ext : 4872  (Tel : 01698 454872)
E-mail : nikki.jarvie@southlanarkshire.gov.uk 
128

Page 129

Appendix 1 – Response to Consultation 
Questions
Q1. Disabled people face barriers when voting in elections. Does the guidance help
Returning Officers to understand these barriers?  
Yes 
No 
Don’t know
Q1a. Is there anything we could add or change in the guidance to improve this? 
No – the guidance is comprehensive and clearly explains the barriers disabled people
face.
Q2. Does the guidance support Returning Officers to understand what their legal
responsibilities are in relation to supporting disabled people to vote at a polling station, and
how to meet them?  
Yes 
No 
Don’t know
Q2a. Is there anything we could add or change in the guidance to improve this? 
No – the guidance clearly sets out the legal responsibilities of the Returning Officer.
Q3. The guidance sets out a minimum list of equipment that should be provided in all polling
stations, and further equipment that Returning Officers could provide if appropriate. Do you
think that the information in the guidance on equipment and support is appropriate?  
Yes 
No 
Don’t know
Q3a. Is there anything we could add or change in the guidance to improve this? 
No – the minimum requirements are clear, and the suggested additional equipment is
also appropriate. 
16
129

Page 130

Q4. Does the guidance help Returning Officers to raise public awareness of the support
available for disabled people voting at polling stations, and how they can request additional
equipment and support?
Yes 
No 
Don’t know
Q4a. Is there anything we could add or change in the guidance to improve this? 
No – the guidance fully explains how Returning Officers and their teams can raise
public awareness and also signposts to other areas of support.
Q5. Does the guidance provide Returning Officers with the information they need to assess
their current accessibility measures and identify ways to improve them for future elections? 
Yes 
No 
Don’t know
Q5a. Is there anything we could add or change in the guidance to improve this? 
No – overall the guidance is clear, easily understood and helpful.
Q6. Do you have any other comments you would like to make on the guidance?   
Firstly, thank you for this guidance. It is clear, constructive and supports our ongoing
work to improve accessibility in elections for disabled voters. We are committed to
removing barriers and this guidance has allowed us to reflect on what further steps
we must take. The guidance strikes the right balance by providing sufficient direction
to inform practice while avoiding an overly prescriptive approach, allowing for local
flexibility, innovation and allowing us to adapt to feedback from both voters and
polling staff. 
Background
Who we are
The Electoral Commission is the independent body which oversees elections and
regulates political finance in the UK. We work to promote public confidence in the
democratic process and ensure its integrity.
We provide comprehensive guidance for ROs, which covers information about what they
should be doing to help support disabled voters to participate. It includes specific
resources to help and support disabled voters at polling stations. For example, we
produce a polling station accessibility checklist to highlight practical accessibility
130

Page 131

considerations, and a handbook for polling station staff with information on how to ensure
voting at the polling station is accessible. We have also worked with RNIB and Mencap to
create videos for use during polling station staff training, to help staff better understand
the challenges disabled voters may face when going to a polling station.  
You can find out more about our role and responsibilities on our website. 
Legislation
The UK Elections Act 2022 included provisions relating to assisting disabled people to
vote whether they are blind, partially sighted, or have another disability, and these
provisions have been in effect for reserved elections since 2023.
We published the first version of the guidance in 2023. We undertook an initial six-week
public consultation in September 2022 on the draft guidance followed by a further six-
week statutory consultation in December 2022 (Opens in new window via links).  
Governments in both Scotland and Wales have now legislated to introduce the same
provisions for Scottish Parliamentary elections and Senedd elections respectively. These
provisions will require ROs to provide such equipment as is reasonable for the purposes
of enabling, or making it easier for, relevant persons to vote independently and in secret.
Relevant persons are defined in the legislation as those who find it difficult or impossible
to vote due to blindness, partial sight or another disability.
Independently refers to voting without assistance from another person, not without any
form of assistive device.
These provisions will apply to:
• Scottish Parliament elections
• Senedd elections
In future, it is the intention that the provisions will also apply to local government elections
in Scotland and Wales, once the legislation for those elections is in place.  
For Senedd and local government elections in Wales, equivalent provisions were
introduced by the rule 37(14) of the Senedd Cymru election rules in Schedule 5 of the
draft Senedd Cymru (Representation of the People) Order 2025 and article 14 of the draft
Scottish Parliament (Elections etc.) (Miscellaneous Amendments) Order 2025 which are
due to enter into force this year. 
131

Page 132

132

Page 133

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 9 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Freedom of Information Reform (Scotland) Bill: Call for
Views 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide the Committee with an update on the Freedom of Information Reform
(Scotland) Bill (the Bill) currently being considered by the Scottish Parliamentary
Scrutiny Committee and to note 2 responses on behalf of the Council submitted
prior to the deadlines of 22 October and 6 November 2025, on the Bill and the
associated Financial Memorandum 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of this report be noted; and
(2) that the responses issued on behalf of the Council in advance of the Call for
Views deadline of 22 October 2025, and the separate response issued on the
Financial Memorandum on the Bill in advance of the deadline of 6 November
2025, as set out in Appendix 1 and 2 to this report be noted. 
3. Background – Current Freedom of Information Legislation
3.1. The Freedom of Information (Scotland) Act 2002 (FOISA) gives a general right to
information held by Scottish public authorities.  It operates within a wider legislative
landscape on access to information which includes the Environmental Information
Regulations (Scotland) 2004 (EIRs), and regulation of access to and disclosure of
personal information under the UK General Data Protection Regulation and the Data
Protection Act 2018.  A wide range of public bodies (listed in the Schedule 1 to
FOISA) including the Scottish Government, the Scottish Parliament, local authorities,
Police Scotland, the Scottish Fire and Rescue Service, and Registered Social
Landlords are subject to FOISA.  The Scottish Government has the power to
designate further organisations as public bodies under FOISA with approval of the
Scottish Parliament.  This has led to organisations including housing associations
(RSLs), privately run prisons, sports and cultural trusts created by public authorities
and grant aided and special schools coming under the scope of FOISA. 
17
133

Page 134

3.2. Public authorities are required to respond to requests for information “promptly” and
within twenty working days and are required to publish information under the
“publication scheme duty”.  This scheme outlines the information already published,
where it can be found, and the costs (if any) a public authority charges to provide it. 
A link to the Council’s Publication Scheme is available in the list of background
papers below. 
3.3. Requests for information can be refused if:- 
 the authority does not hold the information requested
 the information is already available
 not enough detail has been provided by the requester to enable the authority to
respond to the request, which may result in the authority asking for “reasonable”
clarification, with the effect that the ‘clock’ is reset once clarification has been
provided
 it would cost the authority more than £600 to provide the information (based on a
capped rate of £15 per hour of time incurred in doing so)
 the request is recorded as “vexatious” because it disrupts the authority’s work in
an unreasonable way
 the requester has asked for information in a format the authority cannot
reasonably provide
 the information requested is exempt from disclosure by reason of a provision in
FOISA/EIRs e.g. confidentiality 
3.4. Requesters can request an internal review if they are dissatisfied with the response
they have received.  The Council has procedures in place to deal with such internal
reviews.  If the requester is unhappy with the authority’s handling of the review, they
may appeal to the Scottish Information Commissioner (SIC).  A requester may also
appeal to the Court of Session if they believe that a decision of the Commissioner is
based on an incorrect understanding of a point of law.  The First Minister may also
overturn a decision notice issued by the Commissioner by issuing a “ministerial
certificate”. 
3.5. In addition to the legislation, there are two codes of practices that Scottish Ministers
have produced and maintain under FOISA, and which public authorities should
follow: the Code of Practice on the Discharge of Functions by Scottish Public
Authorities and the Code of Practice on Records Management by Scottish Public
Authorities. 
3.6. By way of context, in 2024/25 the Council received approximately 1,600 information
requests under FOISA and 300 under the EIRs.  According to the information
published with the Bill, in the same period NHS Greater Glasgow and Clyde received
approximately 1,400 requests under FOISA. 
4. The Freedom of Information Reform (Scotland) Bill, Context and “Call for
Views”
4.1. On 1 November 2022, Katy Clark MSP produced a draft proposal for a Member’s Bill
which aimed to “reform Freedom of Information legislation in Scotland”.  Consultation
on the Bill was carried out between 2022 and 2023, and a public awareness
research exercise was then carried out by the SIC in 2024 into attitudes towards
freedom of information law and rights.  Responses and outcomes in relation to both
are included in the list of background papers.
134

Page 135

4.2. The Bill was introduced on 2 June 2025 and proposes to make a number of key
changes to FOISA.  The stated aim of the Bill is to enhance the public’s right to
information and improve transparency among public authorities.  In summary it
includes the following changes:- 
 Presumption in favour of disclosure: A new general presumption that
information should be disclosed unless an “absolute exemption” applies
 Extension of FOI: The Scottish Parliament would have powers to designate
additional bodies as being subject to FOISA, including contractors delivering
services on behalf of public authorities
 Changing Response Times: A "clock pause" mechanism for response 
▪ periods while clarification is awaited
 No More Publication Schemes: The requirement to maintain a publication
scheme would be replaced by a proactive publication duty supported by a new
publication code of practice
 Appointment of Freedom of Information Officers, being a new statutory
post: The reasoning for this is to help improve compliance with FOISA and
includes public authority obligations and prescribes FOI Officer “tasks”
 Strengthened Enforcement Powers: The Scottish Information Commissioner's
powers would be enhanced, allowing referrals to the Court of Session for non-
compliance with timescales and the Codes of Practice 
4.3. The Bill is currently at Stage 1 in the Scottish Parliament.  The Standards,
Procedures and Public Appointments (SPPA) Committee of the Scottish Parliament
sought views by 22 October 2025 to inform the Committee’s scrutiny of the Bill and
to help the Committee understand if the stated aims outlined above are likely to be
achieved.  In summary, having considered the Bill, the Council’s position is that a
number of the proposals would create further pressure on the Council both financially
and from a resourcing perspective.  Given the timescales for responding to the Call
for Views a response was issued on behalf of the Council in advance of the 22
October deadline, a copy of that response being included in Appendix 1 to this
report. 
4.4. There was a separate Call for Views on the Financial Memorandum which was also
issued in respect of the Bill.  The deadline for responses to that was 6 November
2025.  Again, given these timescales a response was issued on behalf of the Council
in advance of the deadline, a copy of that response being included in Appendix 2 to
this report. 
4.5. Following consideration of responses received, the SPPA will then publish a Stage 1
report before the debate on the general principles of the Bill takes place.  It is not
clear whether all the requisite stages of this Bill will progress in a manner which will
result in the Bill becoming law by the Scottish Parliamentary Elections cut-off which
is likely to be mid-March 2026.  If enacted in its current form, the legislation would
significantly broaden the scope of freedom of information law in Scotland, potentially
bringing a wider range of service providers under its remit and increasing internal
administrative responsibilities related to FOISA compliance. 
5. Employee Implications
5.1. There are no employee implications directly arising from this report.
135

Page 136

6. Financial Implications
6.1. There are no financial implications directly arising from this report. The Council has
concerns over the potential financial implications of the Bill, were it to become law,
and these are covered in the consultation responses. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this
report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. There is no need for an integrated impact assessment or formal consultation to be
undertaken at this time.  Members of the Council’s Corporate Management Team
and the cross-service Information Governance Board were made aware of this call
for views, and feedback sought on the Council’s response on the Bill in advance of it
being submitted. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
21 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Fair, open and sustainable
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Freedom of Information Reform (Scotland) Bill as introduced
 Guide to the Freedom of Information Publication Scheme - South Lanarkshire Council
 FOI/EIR: section 60 code of practice - gov.scot
 Section 61 code of practice on records management - gov.scot
 Consultation Results Summary: https://www.parliament.scot/-
/media/files/legislation/proposed-members-bills/final-version--foi-consultation-
summary.pdf
 SIC 2024 Poll Report https://www.foi.scot/sites/default/files/2024-
05/Public%20Awareness%20Research%20Report%202024.pdf 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Iain Strachan, Head of Administration and Legal Services
Ext: 4658 (Tel:  01698 454658)
E-mail: iain.strachan@southlanarkshire.gov.uk 
136

Page 137

APPENDIX 1 – Response Issued to Freedom of Information Reform (Scotland) Bill:
Call for views 
Freedom of Information Reform (Scotland) Bill: Call for views 
Q Page 1 
1. To what extent do you believe the proposals in the Bill will help achieve its primary
aim of improving transparency in Scotland by strengthening the Freedom of
Information (Scotland) Act 2002?
South Lanarkshire Council supports the aim of improving transparency and people’s access
to information rights subject to measured exemptions and restrictions but is concerned that
some of the proposals in the Bill will not do so in a proportionate manner, given the duties
local authorities are already under and the current resource challenges facing the sector.
The Council would question the necessity of the legislation, without additional resources
being made available to assist organisations with implementation and ongoing future
compliance. 
The Council is particularly concerned about the risk of deterring private organisations from
bidding for public sector contracts, and the likely additional costs which would be passed on
to the public sector, should companies providing services to public authorities be included
within the scope of the Freedom of Information regime. 
2. Do you support the proposal that when a public authority is deciding whether to
withhold information under a qualified exemption, it must begin from the position
that the information should be disclosed?
This is unlikely to have any significant impact on public authorities and is a familiar concept
in that there is a similar provision in Regulation 10(2)(b) of the Environmental Information
(Scotland) Regulations 2004. It is noted that this proposal does not apply to information
where an absolute exemption applies. It would, however, assist were the Bill to be clear in
what instances the presumption can be rebutted. 
3. Do you agree with the repeal of the current provisions in relation to publication
schemes and the introduction of a proactive publication duty and code of practice?
South Lanarkshire Council would, in principle, welcome a general obligation to take
reasonable steps to organise the information it holds in relation to its functions (where it is
relevant to the public interest) and make that information available to the public in an
accessible form and manner. However, it is satisfied that the current arrangements in place
are sufficient for these purposes, when the volume and breadth of information held by the
authority is considered and the ongoing maintenance that the publication would then
require. 
However, a broad statutory duty to publish information is not supported by South
Lanarkshire Council as it believes this is not proportionate, both in terms of cost and
resourcing, unless additional resources are made available to assist local authorities with
implementation and ongoing future compliance), and could result in resources being
diverted from elsewhere in order to meet this further statutory duty. 
This proposal, as currently drafted, is quite high-level, and more details setting out what
such a duty would involve, how this would be reflected in any new code of practice issued
by the Commissioner under section 60B and how this would be enforced is crucial to
understand the full extent and impact of this provision.  As matters stand, the current
position is considered sufficient, while also providing authorities with discretion to
proactively publish more information, where that is felt appropriate.
137

Page 138

Q Page 2 
1. Do you support the proposal that the 20-day period for a response to be provided
should be paused rather than reset in relation to requests on which the public body
seeks clarification from the requester?
Excluding from the calculation of the 20- day response period any time between the
authority requesting more information and receiving that information will place further
pressures on local authorities and is not supported. While South Lanarkshire Council
makes every effort to seek clarification at the earliest opportunity as required by the section
60 code of practice, it is not always possible to do so, and, as there is no provision
permitting an extension of time to respond to complex or large volume requests (as there is
in the Environmental Information (Scotland) Regulations 2004) this would add further
resourcing pressures on local authorities in such cases. 
In addition, it is understood that local authorities are experiencing more complex requests
and more often (possibly generated by AI). These take more time and invariably involve
more resources to gather the information for a response and to identify whether clarification
is required.  This proposal would place an additional burden on resources and could lead to
an increase in late responses and potentially more reviews requests and, as a result, is
unlikely to enhance the requester’s rights in a meaningful way. 
2. Do you think that the provisions of the Bill in relation to the reporting by Scottish
Ministers of the use of ‘section 5’ powers to designate new public authorities would,
as the Policy Memorandum contends, “incentivise Scottish Ministers to regularly use
their section 5 powers and at a pace which enables the system of independent
regulation to operate effectively”?
South Lanarkshire Council is not in a position to comment on this question.  However, as
noted above, the Council is concerned in respect of the proposals around the designation of
new public authorities. We comment more on this in the final section of this submission. 
3. Do you support the requirement for all public authorities subject to the Act to
designate a Freedom of Information officer?
South Lanarkshire Council does not support a new statutory Freedom of Information Officer
and regards this as unnecessary. The introduction of this new role as outlined in the
proposed section 61B and the prescriptive nature of the tasks outlined in section 61C would
be a disproportionate response and a further significant burden on resources. Like many
other local authorities, South Lanarkshire Council has a clear and robust framework for
Freedom of Information requests overseen by an internal cross-service Information
Governance Board, chaired by the Council’s Monitoring Officer,  and would suggest that a
more  flexible and proportionate approach would be to allow each public authority to decide
- based on its own requirements, size and structure - the most appropriate way to comply
with FOISA, rather than this being prescribed in the manner proposed. 
In addition, decentralisation of FOISA responsibilities in large public authorities is not
uncommon, and this proposal would add further difficulties in relation to who would be
designated in such a role, particularly given the specific requirements imposed in terms of
section 61B and C. While such organisations, including the Council, already have a
designated Data Protection Officer (DPO), in respect of which there are analogous and
linked duties around information governance and information requests, it is submitted that it
would be inappropriate to assume that this role could be taken on by existing DPOs as this
would simply add further significant duties without due regard for the operational and
resource challenges and further cost implications which would inevitably be caused for
public authorities of all sizes. 
138

Page 139

The provisions in section 61B(3) are of particular concern and South Lanarkshire Council
does not support a statutory obligation on public authorities to provide the  Freedom of
Information Officer with the “necessary resources” to enable them to perform the prescribed
statutory “tasks” and to maintain their “expert knowledge”.  The tasks set out in section 61C
are overly prescriptive and create further obligations for public authorities. Given the nature
of the Freedom of Information regime, the rights and duties already in place, and in the
absence of any substantiated need for such a role and additional resources to support the
creation of the role on a sustainable basis, It should be for individual authorities to
determine how they should direct their limited resources to deliver their services and
discharge their duties. 
Q Page 3
1. The Bill proposes the introduction of an offence to prevent destruction of
information with the intent to prevent disclosure, even when no information request
has been made. Do you support this proposal? 
South Lanarkshire Council does not support this proposal and sees it as unnecessary and
very likely to create significant confusion. From a practical point of view, it is not clear how
this offence (the intention) would be evidenced or how the offence would be enforced.
There is a risk that routine disposal of information at a time when no information request
has been made could later be said to be an offence, just because such a request might
have been later made. This could also risk authorities having to ensure they had ability to
store more information that might otherwise have been destroyed, physical and electronic,
with the associated cost and no additional funding being provided to meet this
South Lanarkshire Council would suggest that this is already dealt with sufficiently in the
Scottish Public Records Act and the sections 60 and 61 codes of practice and appropriate
updates to the new codes of practice could sufficiently deal with this matter. 
2. Do you support the proposal to remove the power of the First Minister to ‘veto’
certain decision of the Scottish Information Commissioner in relation to information
deemed to be of “exceptional sensitivity”?
South Lanarkshire Council has no comment to make in response to this question. 
3. Do you support the proposals to strengthen the general functions and
enforcement powers of the Scottish Information Commissioner, and to introduce an
exemption for information provided to the Commissioner during the investigation of
appeals? 
South Lanarkshire Council is generally supportive of an appropriately resourced regulator
with reasonable powers to discharge the functions conferred upon it. Comments on some of
the specific proposals are as follows: 
Section 12 – Enforcement notices 
The power to issue enforcement notices in respect of a failure by a Scottish public authority
to comply with a provision of a code of practice is noted. While the Scottish Information
Commissioner is understood to currently issue many fewer enforcement notices than
decision notices, this could add further pressure on public authorities should there be a
trend towards increasing the use of such notices for this purpose, and could be excessive. 
The Council is also not clear that the necessity of the proposed changes have been
demonstrated. If used, timescales for complying should be reasonable and proportionate to
the nature and severity of the failure to comply. Consulting with the Keeper of the Records
of Scotland before issuing enforcement notices under the section 61 code of practice
139

Page 140

appears to be reasonable and is consistent with the current requirement to consult the
Keeper before issuing a practice recommendation. 
Section 14 – Failure to comply with notice
Referring a public authority’s failure to comply with a deadline in a decision notice issued by
Commissioner to the Court of Session and dealing with the failure as if this is a contempt of
Court is not inconsistent with other sanctions available to more serious failures to comply
with enforcement action.  South Lanarkshire Council is concerned, however, that such a
new power (or the threat of using it) could be used in a manner which would place further
and unreasonable pressures on local authorities.  It is suggested that the necessity for this
should be explored further and at the same time other options should be considered, such
as publishing a failure to comply with such a deadline and naming the public authority
concerned. 
Q Page 4 
1. Do you have any views on the estimated costs and savings associated with the
proposed changes set out in the Bill?
There is significant concern around the apparent lack of appreciation and understanding
about the current cost and resource implications of FOISA and the Council is of the view
that further consideration should be given to the operational requirements to meet these
obligations and the additional costs of the proposals in the Bill. In particular, the Financial
Memorandum notes that “This Bill will lead to savings for bodies who are currently
designated by greater use of proactive publication with streamlined processes.” The
Council, however, is not clear the basis upon which this has been substantiated, given the
additional resources that would be required to comply with the additional requirements as
currently set in the Bill, and other associated impacts. 
There is also a lack of clarity around how many of the proposals in the Bill would work in
practice, such as the proactive publication proposal. This is of real concern given the
demanding operational issues and financial challenges facing local authorities which are
likely to be more difficult in the coming years. 
As such, and for the reasons set out in this response, the Council is very concerned that the
Bill, were it to become law, would result in significant additional unbudgeted resource
pressures for the Council, unless additional resources are made available to assist local
authorities with implementation and ongoing future compliance 
2. Please use the text box below to set out any further comments you wish to make
about the Bill. 
The Council suggests that further consideration should be given to the necessity for and the
proportionality of some of the proposals within the Bill, particularly given the resource
constraints faced by local authorities. 
The Council is concerned in respect of the proposals around the designation of new public
authorities, in the context of a local authority setting, that there is a risk of deterring private
bodies from bidding for public sector contracts, if there is the potential they could come
within the scope of the Freedom of Information regime. It is also likely that such obligations
would incur additional costs which would be passed on to the public sector. There is also a
risk this could place Scottish-based companies at a significant competitive disadvantage
compared to companies based outwith Scotland as the Scottish company would need to
factor in FOI compliance costs which their non-Scottish counterparts would not need to
include. It is also unclear from the draft Bill how far down the supply chain these provisions
140

Page 141

are intended to apply. The Council is concerned as to how this fits with other priorities for
local government such as Community Wealth Building. In addition, it is not clear how would
this approach work in practice, is it for contract length only or retrospective and is it also
intended to apply to third sector providers? 
The Council has nothing further to add. 
141

Page 142

APPENDIX 2 – Response Issued to Freedom of Information Reform (Scotland) Bill:
Call for views 
Financial Memorandum: Call for views 
1. Did you take part in any consultation exercise preceding the Bill and, if so, did
you comment on the financial assumptions made?   
No, the Council did not. 
2. If applicable, do you believe your comments on the financial assumptions
have been accurately reflected in the FM?   
Not applicable. 
3. Did you have sufficient time to contribute to the consultation exercise? 
Not applicable, but we had sufficient time to respond to the Call for Views on the Bill,
although more time would have been helpful. 
4. If the Bill has any financial implications for you or your organisation, do you
believe that they have been accurately reflected in the FM? If not, please
provide details. 
The Council supports the aim of improving transparency and people’s access to
information rights subject to measured exemptions and restrictions but is concerned
that some of the proposals in the Bill will not do so in a proportionate manner, given
the duties local authorities are already under and the current resource challenges
facing the sector. 
The Council also appreciates the Bill’s intention to deliver cultural change. However,
the Bill would have potentially significant financial implications for the Council. As
reflected in the Council’s separate response to the Call for Views on the Bill, the
Council does not believe these have been accurately reflected in the Financial
Memorandum. 
There is significant concern around the apparent lack of appreciation and
understanding about the current cost and resource implications of FOISA and the
Council is of the view that further consideration should be given to the operational
requirements to meet these obligations and the additional costs of the proposals in
the Bill. In particular, the Financial Memorandum notes that “This Bill will lead to
savings for bodies who are currently designated by greater use of proactive
publication with streamlined processes.” The Council, however, is not clear the basis
upon which this has been substantiated, given the additional resources that would be
required to comply with the additional requirements as currently set in the Bill, and
other associated impacts. 
The Council is neither clear that it should “make savings from the S3 designations as
they should no longer require to administer those organisations FOI applications for
them”, and is again not clear the basis upon which this has been substantiated, i.e.
where bodies are wholly owned by Scottish public authorities the FOI regime would
also apply to them as public owned companies through the Bill. 
142

Page 143

There neither appears to have been a consideration of the additional cost that might
be incurred by private sector companies bidding for Council contracts, should they
become subject to the FOI regime, and look to pass such cost onto the Council, or
else not bid resulting in reduced competitive tension in such procurement exercises
and higher pricing. 
There is also a lack of clarity around how many of the proposals in the Bill would
work in practice, such as the proactive publication proposal. This is of real concern
given the demanding operational issues and financial challenges facing local
authorities which are likely to be more difficult in the coming years. 
It is noted that the Financial Memorandum estimated an annual ongoing cost of
employing an FOI Officer as between £39,480 and £78,171 b for each body. Even if
that costs is correct for the Council that would present a further unbudgeted cost that
would need delivered and require a cost saving elsewhere in the Council, and
potentially the loss of another post. 
As such, and for the reasons set out in this response, the Council is very concerned
that the Bill, were it to become law, would result in significant additional unbudgeted
resource pressures for the Council, unless additional resources are made available
to assist local authorities with implementation and ongoing future compliance 
5. Do you consider that the estimated costs and savings set out in the FM are
reasonable and accurate?   
For the reasons set out above, the Council does not believe they are in assessing
the potential implications of the Bill as a whole. 
6. If applicable, are you content that your organisation can meet any financial
costs that it might incur as a result of the Bill? If not, how do you think these
costs should be met?   
For the reasons set out above, the Council is not content that it can meet any
financial costs that might be so incurred, unless additional resources are made
available to assist local authorities with implementation and ongoing future
compliance. 
7. Does the FM accurately reflect the margins of uncertainty associated with the
Bill’s estimated costs and with the timescales over which they would be
expected to arise? 
Given our comments above, the Council does not believe it does. 
143

Page 144

144

Page 145

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject:  Annual Procurement Report – 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Annual Procurement Report for 2024/2025
[1purpose]
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Annual Procurement Report for 2024/2025 be noted.
[1recs]
3. Background
3.1. The Procurement (Scotland) Reform Act 2014 requires contracting authorities to
prepare and publish an annual procurement report on its regulated procurement
activities. 
3.2. This report to Committee provides an overview of the annual report highlighting key
content from each of the sections.  The full annual report is provided as Appendix 1. 
4. Annual reporting requirements
4.1. The Act states that the annual report must include:- 
 Regulated procurement activity
 Procurement strategy
 Community Wealth Building and Community Benefits
 Sustainable Procurement and Supported Businesses
 Future planning
 Other information 
4.2. Section 2: Regulated Procurement Activity
4.2.1. Regulated procurement is defined by the Procurement Reform (Scotland) Act 2014
as any procurement with an estimated value of over £50,000 for supplies or services
or £2 million for works contracts.  The Council includes all awards over £50,000 in
the Annual Report for transparency. 
4.2.2. The Council’s contract awards in 2024/2025, as detailed in Appendix 1 of the annual
report, totalled 213 contracts (over £50,000) with a total value of £250 million.  This
compares to 196 contracts for the same period in 2023/2024. 
18
145

Page 146

4.3. Section 3: Regulated Procurement Compliance 
4.3.1. This section sets out how procurements carried out demonstrated compliance with
the Council’s Procurement Strategy and Procurement regulations. 
4.3.2. The Procurement Strategy 2023 to 2028 was endorsed by Finance and Corporate
Resources Committee on 3 May 2023 and approved by the Executive Committee on
17 May 2023.  The Strategy is subject to annual review, including an action plan to
ensure continuous improvement across procurement activity and an update on the
Procurement Strategy for 2024/2025 was reported to this Committee on 22 May
2024.  The Annual Report highlights actions completed during 2024/2025, including
improved levels of local spend, efficiencies delivered by the procured spend review
and improvements in Community Benefit monitoring. 
4.3.3. The Annual Report also outlines the Council’s arrangements to ensure compliance,
transparency and Value for Money. 
4.4. Section 4: Community Wealth Building and Community Benefits 
4.4.1. This section of the annual report has been developed to focus on procurement
outcomes from the Community Wealth Building Strategy, including levels of local
spend.  Local spend improved from 19% in 2023/2024 to 25% in 2024/2025,
representing £108 million of spend with local enterprises.  There are a number of
local enterprises with positive improved spend positions in comparison to last year,
including social care providers, vehicle purchases, transport contractors and
construction companies.  In addition, data cleansing and improved definition of local
companies with the National Observatory data analytics has contributed to the
improved position. 
4.4.2. The Council’s approach to secure Community Benefits is outlined in the Annual
Report.  In 2024/2025, 339 Community Benefit commitments from 109 contracts are
detailed, in comparison to 131 Community Benefits secured in 2023/2024 from 31
contracts.  Case studies of appropriate projects are included, including contracts with
Findel Education and Wellwood Communications.  The delivery status of Community
Benefits is also included. 
4.5. Section 5: Sustainable Procurement and Supported Businesses
4.5.1. This section of the report provides an update on the Council’s progress in
embedding the Scottish Government’s sustainable procurement tools and examples
of sustainable outcomes.  Positive sustainable outcomes in procurement include
compliance with Fair Work First guidance, provision of guidance to Resources for
sustainability questions to support the mandated 30% sustainability score in tenders
and use of the sustainability test to embed sustainability measures in the Passenger
Transport, Boiler and New Build Housing tenders. 
4.5.2. The Council’s responsibility to facilitate the involvement of supported businesses in
procurement is also outlined in this section.  Supported businesses are enterprises
whose main aim is to integrate disabled or disadvantaged people socially and
professionally.  Their workforce must be at least 30% disabled or disadvantaged, as
specified in EU Directive 2014/24/EU.  The Council’s contractual activity with
supported businesses and social enterprises is noted, including Haven Products,
Hey Girls and Scotland’s Bravest Manufacturing Company.  
146

Page 147

4.6. Section 6: Future Planning
4.6.1. A summary of the regulated procurements the authority expects to award in the next
2 years, including renewals and new contracts, is included in Appendix 3 of the
report, which has been developed following procurement service planning
consultation with Resources. 
4.6.2. The procurement programme for 2025/2026 and 2026/2027 contains a significant
volume of projects, including high value construction, IT and economic development
projects and continuing phases of the various Education and Social Care long-term
Procured Service Arrangements. 
4.7. Section 7: Further information
4.7.1. Information to be included in this section is not prescribed, however, the Council has
highlighted several areas, including local and SME spend analysis and invoicing and
e-invoicing performance information for 2024/2025. 
4.7.2. As referenced at 4.4.1, spend in the South Lanarkshire area (for all contractors,
including SMEs) increased to 25%. 
4.7.3. A geographical analysis of spend is included in the annual procurement report and
quantifies spend for the wider Lanarkshire area (35%), Glasgow City Region (51%)
and across Scotland (63%): positively, spend retained within the Glasgow City
Region increased by 6% in 2024/2025. 
4.7.4. The Procurement Service continue to work in partnership with the Economic
Development Service and the Supplier Development Programme to improve the
participation of local SMEs in Council contracts, an area of focus in the spend pillar
of the Council’s Community Wealth Building strategy. 
4.7.5. An analysis of the impact on local spend through collaborative arrangements is also
included in the annual report, noting that £5.8 million (13%) of South Lanarkshire
Council spend via Scotland Excel frameworks is with local enterprises, a decrease
from £6.7 million in 2023/2024.  In 2024/2025, £69 million of spend was directed to
South Lanarkshire companies from Scotland Excel in total (spend via all local
authorities), a slight decrease from £70 million in 2023/2024. 
4.7.6. Council spend with Hub South West reduced to £1.9m in 2024/2025 (of which no
spend was with local enterprises), compared to £10.6 million in 2023/2024 (£2.7
million of local spend).  However, Hub South West’s total sub-contracted spend in
South Lanarkshire increased from £4.1 million to £33.8 million, confirming the wider
economic benefits from collaboration. 
4.7.7. The Annual Procurement Report 2024/2025 is attached as an Appendix for noting
and publication thereafter. 
5. Employee Implications
5.1. The forward programme presents a significant number of projects for delivery by the
Procurement Team, at a time when the recruitment of experienced procurement staff
continues to be extremely challenging.  The recruitment programme of procurement
graduates supports the capacity of the team. 
6. Financial Implications
6.1. The financial implications of procured spend is accounted for within Resource
budgets.  
147

Page 148

7. Other Implications
7.1. Given the large volume of projects identified in the forward programme there is a risk
that some procurement activity may be affected due to resourcing challenges.
Projects will therefore continue to be prioritised and assessed to minimise the risk of
disruption. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
28 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Annual Procurement Report 2023/2024, Finance and Corporate Resources Committee,
30 October 2024
 Procurement Strategy 2023-2028, Finance and Corporate Resources Committee, 3 May
2023
 Procurement Strategy review 2024/2025, Finance and Corporate Resources
Committee, 22 May 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Craig Fergusson, Head of Finance (Transactions) 
Ext: 4951   (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
148

Page 149

Finance and Corporate Resources
Executive Director Jackie Taylor 
Annual Procurement Report 
2024/2025 
If you need this information in another language or format, please contact us to discuss how we can
best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.UK
18
149

Page 150

Contents   
1. Introduction 
2. Regulated Procurement Activity 
3. Regulated Procurement Compliance 
4. Community Wealth Building and Community Benefits 
5. Sustainable Procurement and Supported Business 
6. Future Regulated Procurements 
7. Further Information 
Appendix 1: Contracts Awarded 
Appendix 2: Procurement Strategy Action Plan 
Appendix 3: Future Regulated Procurements 
150

Page 151

1. Introduction 
South Lanarkshire Council’s Procurement Service supports the delivery of works,
supplies and services across the Council and has a vital role in ensuring services
operate efficiently and effectively. 
The report details the Council’s regulated procurement activity for the period 1 April
2024 to 31 March 2025, as required by the Procurement Reform (Scotland) Act
2014. During this period, the Council’s total procured spend was £476m. 
Our annual report will publish the Council’s performance in procurement activity by
providing the following information:
• a summary of regulated procurements, including all procurements over
£50,000.
• a review of whether those procurements complied with our published
Procurement Strategy and where they did not, a statement on how we intend
to achieve compliance.
• a review of Community Wealth Building activity and summary of Community
Benefits achieved.
• a summary of progress in facilitating the involvement of Supported
Businesses.
• a summary of future regulated procurement, including all procurements over
£50,000 expected to commence in the next two financial years. 
The Procurement Service continued to support Council services through challenging
financial conditions while continuing to focus on the seven objectives of the Council’s
Procurement Strategy:   
Compliance
Value for
Money 
Collaborate
Contract and
Supplier
Management 
Fair Work
First
Sustainable
and Ethical
Community
Wealth
Building
151

Page 152

2. Regulated Procurement Activity 
A regulated procurement is defined by the Procurement Reform (Scotland) Act 2014
as any procurement with an estimated value of over £50,000 for supplies or services
or over £2m for works contracts. A regulated procurement is complete when the
contract award notice is published and can include new contracts and framework
agreements. 
In addition, regulated procurements will be subject to the Public Contracts (Scotland)
Regulations 2015 where they meet the appropriate thresholds. The Council must
follow the relevant procurement rules in respect of planning through to contract
award, as detailed in Section 3: Regulated Procurement Compliance. 
In total, the Council awarded 213 contracts over £50,000 in 2024/2025, with a total
award value of £250m, as listed in Appendix 1 (excluding the value of long term
frameworks, Dynamic Purchasing Systems and Procured Spend Arrangements).
This includes both regulated and non-regulated contracts, with the Council
publishing all awards over £50,000 in this Annual Procurement Report for
transparency. All live contracts are published in the Council’s online contract register
regardless of value. 
152

Page 153

3. Regulated Procurement Compliance 
The Procurement Reform (Scotland) Act 2014 requires all contracting authorities to
publish a Procurement Strategy. 
2024/2025 was the second year of our Procurement Strategy 2023-2028, which aims
to promote best practice across all procurement activity, while supporting the
Council’s priorities set out in the strategic plan “Connect”. The strategy is supported
by an Action Plan to ensure compliance for all procurement activity, including
regulated procurements, and is subject to annual review to reflect new legislative
requirements, innovation and updated priorities. 
A summary of the Council’s strategic procurement objectives is included in Appendix
2. Progress in achieving our Procurement Strategy action plan is monitored by the
Council’s Corporate Management Team and Finance and Corporate Resources
Committee. 
Key achievements in 2024/2025 included:
• Continuation of the Council’s Procured Spend Review project, with efficiencies of
over £2.5m achieved since 2021.
• Increased level of spend with local enterprises from 19% to 25% in 2024/2025,
representing £108m spent locally, of which £86m was with SMEs. 
• Implementation of the Council’s new financial management system “Oracle Fu-
sion” from April 2024. The new system contributes to improved procurement
compliance through an integrated Contract Register with workflow authorisation
for contract awards, with spend linked to contract value.
• Continued delivery of payment of Living Wage in all Social Care and Early Learn-
ing contracts, uplifted in April 2024. 
• Improved monitoring the Community Benefits delivery through our new software
“Cenefits”. 
Procurement Compliance and Transparency 
The Council’s procurement activity, including regulated procurements, is undertaken
in accordance with a legal and procedural framework to ensure compliance with the
procurement regulations. Legal requirements are underpinned by the Council’s
Standing Orders on Contracts and procedural arrangements are as set out in the
Scottish Government’s Procurement Journey.   
Additional governance and monitoring arrangements for regulated procurements
ensure a robust structure is in place to ensure compliance. At a practical level this
consists of the preparation and authorisation of sourcing strategies and tender
documentation through to robust arrangements for authorisation of awards. To
maintain the highest standards of transparency, the Council’s Standing Orders on
Contracts mandate that all contract awards over £50,000 are reported to Committee,
with all reports available in the public domain. The Council also maintains a publicly
accessible online contracts register with access to all contract awards of all values
and we continue to publish our register monthly to ensure transparency. 
153

Page 154

The Council also has a scrutiny review structure in place to review tendering and
award arrangements for high-risk procurements. These arrangements provide
assurance that all regulated procurements were materially compliant with the
strategy. 
The Council monitors contractual compliance, with 96% of 2024/2025 spend over
£50,000 with contracted suppliers. Arrangements to monitor and control spend
compliance to contracts have been improved following the implementation of Oracle
Fusion and a quarterly review process is in place to identify and resolve spend with
non-contracted suppliers. 
Value for Money 
Value for Money in contractual arrangements is a key strategic objective of the
Procurement Service and a review of procured spend is one of the Council’s key
efficiency review areas led by the Corporate Management Team. 
The review set ambitious targets to review procured spend across all Council areas
and seek deliverable revenue efficiencies: either through review of existing
contractual arrangements or by putting new contracts or collaborative agreements in
place. In the previous three-year period, total efficiencies of £2.5m have been
identified. 
154

Page 155

4. Community Wealth Building and Community Benefits 
Community Wealth Building
The Council’s Community Wealth Building Strategy was approved by the Council in
2021 and sets out five strategic pillars to develop resilient local economies. The
“spend” pillar seeks to use the purchasing power of the Council and other local
anchor institutions to improve local spending and deliver positive impacts on
employment opportunities: the Procurement Service and our colleagues in Economic
Development are responsible for delivering the actions for this pillar. 
Key achievements for the Procurement Service in 2024/2025 included:
• £108m spent in the local South Lanarkshire economy, an increase from £67m
in 2023/2024 and improving spend levels with local enterprises to 25% of core
trade spend.
• Continuing to focus on the use of Quick Quote for Works up to £2m to
improve the engagement of local enterprises in Council tenders, with 9 local
awards totalling £1.7m through this route.
• Engagement with local suppliers with the Supplier Development Programme
including participation in Meet the Buyer events, Build Lanarkshire and pre-
tender opportunity events. 
• Promotion of subcontracting opportunities for local enterprises with Scotland
Excel framework opportunities and HubSW projects. 
Community Benefits
Community Benefit clauses require contactors to deliver long term sustainable social
and economic benefits to the South Lanarkshire community, while demonstrating
Best Value in contract awards. 
The Procurement Reform (Scotland) Act 2014 requires the Council to consider
Community Benefits for contract values over £4m, however, the Council will consider
inclusion of Community Benefits in all regulated tenders (over £50,000), regardless
of value, where appropriate to the supplier, value and duration of the contract. 
Consideration of Community Benefits is embedded in the Council’s Sourcing
Strategy and clearly stated in the tender documents to ensure transparency and
fairness in the evaluation process. 
The Council has a points-based system to target Community Benefits, with the
number of points based on the value and duration of the contract. Suppliers select
appropriate community benefits from the Council’s menu of deliverables, including
employability through apprenticeships, work placements, local employment and
engagement with local and SME subcontractors in the supply chain. Since 2023, the
Council’s Community Benefit points menu has included scope for commitments from
the Community Wish List.   
In April 2024, the Council went live with a new monitoring system for Community
Benefits called “Cenefits” which enables delivery of Community Benefit commitments
to be monitored with contracted suppliers. A series of engagement events with
Council suppliers were held with the Supplier Development Programme to launch the
155

Page 156

Cenefits system and the successful implementation has enabled significant
improvements in the Council’s monitoring and delivery of Community Benefits. 
Of the contracts awarded in 2024/2025, 109 had specific Community Benefit
outcomes, with the benefits committed detailed below. Also included in Community
Benefit delivery this year was fulfilment of 51 wishes from the Council’s Community
Wish List. 
Community Benefit 2024/2025 2023/2024
Targeted recruitment and training, including
apprenticeships and work placements
100 47
Supply Chain Initiatives 25 3
Use of local SME 32 11
Use of social enterprise or supported business 1 -
Community consultation 7 4
Young Person engagement 14 2
Educational Career Development support 44 9
Community Endowment 15 8
Local Events 13 6
Physical infrastructure 1 -
Local sponsorship 17 5
Mentoring 8 3
Financial donation  35 25
Environmental support in Education 7 2
Environmental improvements 12 2
Other, including public art projects  8 4
Total 339 131
Community Benefits from Scotland Excel frameworks 59 28 
Community Benefit status 
Of the 339 Community Benefits committed in 2024/2025, the following diagram
summarises the delivery status of each contract: noting that Community Benefits are
delivered over the term of the contract. 
Community Benefit Delivery 2024/2025
Delivered In Progress Due later in contract Overdue
156

Page 157

Community Benefit case studies 
Supplier: Findel Education 
Contract: Education Materials
Contract duration: 3 years
Community Benefit points: 100 
Findel Education provide Educational Materials to South Lanarkshire Council
schools from the Scotland Excel Education Materials Framework. 
In June 2024 Findel Education met their annual commitment to deliver Community
Benefits via the Community Wish List. Findel made five donations to Community
Projects across South Lanarkshire, with a total value of £3,200. 
Donations included:
• Agape Wellbeing Centre in East Kilbride had donations including tables,
splash mats, paints and five wheeled storage boxes.
• The Village Centre in East Kilbride received 12 new chairs 
• Friends of Stonehouse Park received 3 outdoor storage boxes, 5 large indoor
storage boxes and 5 wheeled storage boxes.  
• The Creative Crafters Lego group in Rutherglen received a donation of four
large packs of Building Plates and a 1000-piece Creative Lego bricks box.
• High Blantyre Primary School Parent Council received messy play trays,
texture blocks, sensory toys, a floor cushion and a chair. 
These donations from Findel have been invaluable contributions to these groups,
supporting each of them to continue to provide services and activities with their
communities. 
Supplier: Wellwood Communication Ltd 
Contract: Telephony and Communications Services
Contract duration: 2 years
Community Benefit points: 165 
Wellwood Communications Ltd were awarded a two-year contract via a Scottish
Government Dynamic Purchasing System to provide Telephony and
Communications Services to the Council. 165 Community Benefits points were
attributed to the contract. 
A range of commitments were made under the Councils Community Benefit Menu
which included: 
• Recruitment of an employee
• 1 work experience opportunity
• Supporting Supplier Chain Initiatives
• Use of Local SMEs
• Educational Career development opportunities to local Secondary Schools
• Mentoring a South Lanarkshire SME
• Financial Donations to Community Projects across South Lanarkshire. 
157

Page 158

Delivery of Community Benefits are underway, with Wellwood Communications
having already undertaken mentoring of a local SME, Crawford Decoration, for four
months. Wellwood shared expertise and guidance to the SME in their ambition to
develop and grow their business. This included providing support in professional and
personal development to the business and its staff team. The mentorship included
guidance on planning for the future, managing money, leadership and personal
growth, solving problems creatively and building community connections. 
Crawford Decoration have found the support “invaluable, with mentorship and
guidance…over the past months…the support we received from Drew at Wellwood
has significantly enhanced both my business operations and personal growth.” 
In addition to this mentorship, Wellwood Communications have also engaged with
three other local SMEs in their supply chain and have made their supply chain
requirements known locally to increase opportunities across South Lanarkshire.
SMEs in East Kilbride, Lanark and Hamilton have been engaged in their supply
chain as a result. Wellwood Communications have also reached out to local schools
and have provided opportunities to high school pupils for mock interview
opportunities. Wellwood Communications developed a mock interview session,
taking pupils through the process as well as providing valuable feedback from the
session to support pupils to continue to develop their interview skills. 
The Council continues to work with Wellwood Communications to progress the
remaining Community Benefits committed and will continue to ensure the delivery of
meaningful and impactful community benefits across South Lanarkshire. 
158

Page 159

5. Sustainable Procurement and Supported Business Summary 
Sustainable Procurement 
One of the Council’s key strategic objectives is “Sustainable and Ethical” in
recognition of our responsibility to secure wider social, economic and environmental
benefits through contracts, as set out in the Sustainable Procurement Duty. 
The Council uses the Scottish Government’s Sustainable Flexible Framework to
measure organisational progress in embedding sustainable outcomes: the
framework measures performance across the following areas:
• People: training on sustainable procurement tools is progressing across the
organisation (level 4 achieved)
• Objective, Strategy and Communications: sustainable procurement duty
embedded in Procurement Strategy (level 4 achieved)
• Process: using prioritisation and sustainable toolkits to focus on outcomes at
category and contract level and sustainability scoring improved (level 3
achieved)
• Stakeholders: improved engagement for stakeholders (level 3 achieved) 
• Monitoring and Reporting: on sustainable procurement outcomes through
procurement strategy and annual report (level 3 achieved) 
Prioritisation Tool 
The outcome from the Council’s Prioritisation analysis is detailed below: this
identifies the categories of spend where the Council has scope to improve
sustainable outcomes and influence in the market to achieve this. This analysis will
guide future procurement strategies, focusing on areas of climate impact such as
Construction and Waste Management and those areas with social and economic
impacts, including Social Care and Early Learning. 
• Risk: relevance of overall sustainability risk/relevance (environmental, socio-economic and reputational) to procure-
ment category
159

Page 160

• Scope: How much scope is there to improve the sustainability of procurement of this category
• Influence: level of influence your organisation might have over the market to improve sustainability outcomes 
Examples of good sustainable practice this year include: 
• Continued focus on Fair Work First principles, complying with the seven key
priorities set out by Scottish Government
• Ensuring Real Living Wage paid in social care and early learning contracts,
which accounts for £151m (35%) of council spend. 
• Continuing to embed the Sustainable Procurement Tools, focusing on the
publication of guidance for sustainability questions to support our mandatory
30% sustainability score. 
• Completion of sustainability test to identify key sustainability measures in
Passenger Transport, Boiler and New Build Housing tenders. 
• Rollout of sustainability tender training to 70 contract managers across the
Council. 
Supported Business Engagement 
The involvement of Supported Businesses and Social Enterprises is included in the
strategic objective of “Sustainable and Ethical” and engagement is considered in the
Council’s Sourcing Strategy for new tenders. 
In 2024/2025, the Council’s spend with registered charities totalled £52m,
representing 12% of core spend, an increase from 10% in 2023/2024. We continued
to support Supported Business and Social Enterprises, including: 
Haven Products: Supported Business
The Council has a contract with Haven Products until December 2025 for production
of Homecare uniforms, with an estimated value of £0.180m. Haven Products is a
supported business, providing employment opportunities to disabled people. 
Royal British Legion: Supported Business
The Council has a four-year contract in place with Scotland’s Bravest for signage
manufacture until March 2026, with an estimated value of £0.160m. Scotland’s
Bravest are a supported business supporting veterans with disabilities to develop
new skills, regain independence and earn in a supportive commercial environment. 
Hey Girls Social Enterprise
Hey Girls are based in Dunbar, founded by a mother and her two daughters to
address period poverty through a “Buy One, Give One” social enterprise model. The
Council has four-year contract in place with Hey Girls through the Scotland Excel
Washrooms and Sanitary Framework. Hey Girls continue to be a key supplier in
achieving the Scottish Government’s period poverty targets and the Council’s spend
in 2024/2025 was £0.130m. 
160

Page 161

6. Future Regulated Procurements
The Council’s activity over the next two years in regulated procurement will include
existing contracts which are due to be extended or re-let and new tenders. Appendix
3 provides a list of anticipated future procurements over £50,000 in value.   
The Council continues to develop the use of our long-term flexible framework model
of Procured Service Arrangements for light touch services, including Social Care and
Education. The Council is also extending the use of Dynamic Purchasing Systems
and working closely with the Scottish Procurement Alliance, Procurement for
Housing and Scotland Excel to identify future collaborative opportunities. 
The following provides some examples from the wide range of projects detailed in
Appendix 3 that illustrate the diverse range of commodities and services being
procured by the Council, including:
• Adult and Children’s social care services  
• Early Learning and childcare
• Construction and maintenance contracts for property and roads
• Purchase and maintenance of fleet and vehicles
• Waste recycling and disposal 
161

Page 162

7. Further Information
Procurement Performance information 
The Council reports on a range of performance indicators, including the level of
procurement spend with local companies (based within the South Lanarkshire area)
and SMEs (small and medium enterprises). 
The Council’s spend with South Lanarkshire enterprises (including both SME and
larger companies) increased from 19% in 2023/2024 to 25% in 2024/2025,
representing £108m of spend in the local area. Spend with South Lanarkshire based
SMEs at £86m increased from 17% to 20% and spend with SMEs generally
(including those outwith South Lanarkshire) increased by 1%. The Council’s
Community Wealth Building Strategy continues to target further improvements in
local spend levels. 
Indicator 2022/2023 2023/2024 2024/2025
Core Trade spend £351m £346m £433m
Core spend in South Lanarkshire area 18% 19% 25%
Core spend with South Lanarkshire SMEs 17% 17% 20%
Core spend with SMEs 49% 50% 51%  
(Source: National Observatory) 
In addition to our direct spend with suppliers in the local area, we are also working
towards identification of subcontracted local spend with our tier one contractors,
particularly in major construction projects. Although the Council’s spend with Hub
South West in 2024/2025 reduced to £1.9m, Hub South West’s sub-contracted
spend to South Lanarkshire enterprise from all Hub projects totalled £33.8m:
confirming the importance of encouraging our local enterprises to engage with wider
sub-contracting opportunities across the public sector. 
Where we spend 
A geographical analysis of the Council’s core spend by area is provided below: 25%
of our spend is within South Lanarkshire and 35% of spend was within the wider
Lanarkshire area, including North Lanarkshire. 51% of our spend was with
companies based in the Glasgow City Region: an increase from 45% in 2023/2024.
63% of our total spend is retained in Scotland. 
162

Page 163

Collaborative contracts 
The Council continues to focus on a collaborative approach to procurement
wherever possible and collaborative contracts accounted for 25% of Council spend
in 2024/2025. 
This year, the Council’s spend through Scotland Excel frameworks totalled £44.6m,
of which £5.8m (13%) was spent with local suppliers, a reduction of 1% in
comparison to last year. However, these collaborative frameworks generated £69m
of spend with South Lanarkshire based suppliers in total, including spend from other
local authorities, of which 98% was with SMEs.   
Supplier payment performance and e-invoicing 
The Council continues to exceed the national target of 85% of invoices paid within 30
days of receipt, with 93% of invoices meeting this standard in 2024/2025. This
represented a slight decrease of 1% in comparison to 2023/2024 which is
attributable to the implementation of the Council’s new financial management system
Oracle Fusion, in April 2024, with improvements anticipated from 2025/2026. 
E-invoicing, which enables automated payment of invoices where they can be
electronically matched to a purchase order, has been in place for the Council since
2017. During 2024/2025, 43% of invoices were paid using e-invoicing, a significant
increase in comparison to 19% in 2023/2024 due to new processes implemented
through Oracle Fusion.
163

Page 164

7.1. Appendix 1: Contracts Awarded over £50,000 (including Regulated) 2024/2025 
Award Date Supplier Description Start Date End Date Extension
Date Value
01/04/2024 Various Suppliers
Secure Care Services Call-off from
SXL 0219 Secure Care Services
Framework
01/04/2024 31/03/2027 - 3,500,000.00
01/04/2024 Children 1st Family Group Decision Making 01/04/2024 31/03/2027 - 471,000.00
02/04/2024 John McGeady Ltd NEC3 ECSC for Cunningar Loop
Phase 3 (Allotments and Car Park) 08/04/2024 29/07/2024 - 637,105.17
04/04/2024 Allstar Business Solutions
Ltd
Direct Award for the provision of Fuel
Cards and Associated Services 11/04/2024   - 4,680,000.00
04/04/2024 Ayrshire Tree Surgeons Ltd
Tree Surgeon - Works for Trees af-
fected by Ash Dieback Disease – Lots
1, 2 and 3
04/04/2024 03/05/2024 - 80,569.44
08/04/2024 Various Suppliers Framework for Removals, Storage and
Disposals 23/04/2024 22/04/2028 - 667,500.00
08/04/2024 J C Peacock & Co Ltd                     Supply and Delivery of Bagged Salt for
Winter Road Maintenance 01/04/2024 31/03/2028 - 160,800.00
12/04/2024 Brakes Direct Award for the Supply and Deliv-
ery of Groceries and Provisions 01/05/2024 30/04/2025 - 1,000,000.00
15/04/2024 Blantyre Park Services Ltd TACT Community Hall – H&V Installa-
tion 15/04/2024 07/06/2024 - 129,360.30
16/04/2024 Hugh L S McConnell Ltd Stonefield/ Burnbrae/ Kelvin Gardens
Veranda Refurbishment 01/04/2024 30/11/2024 - 572,369.76
164

Page 165

Award Date Supplier Description Start Date End Date Extension
Date Value
16/04/2024 SACRO Alcohol and Drug Problem Solving
Court Peer Mentor(s) 22/04/2024 21/04/2026 21/04/2028 400,000.00
16/04/2024 The Miracle Foundation
SCIO Parent and Child Dyadic Therapy 15/08/2024 14/08/2025 - 75,000.00
18/04/2024 Sportsafe UK Ltd Inspection and Maintenance of PE
Equipment 01/01/2024 31/12/2026 31/12/2027 160,209.76
19/04/2024 Ringgo Limited Cashless Parking 31/05/2024 30/05/2027 30/05/2028 55,000.00
22/04/2024 Various Suppliers Supply and Delivery of Audio-Visual
Equipment 03/04/2024 02/04/2027 - 345,000.00
24/04/2024 Fast Fixx Catering Engineers
Ltd
Repair, Inspection and Maintenance of
Commercial Catering Equipment 01/05/2024 30/04/2028 - 979,000.00
24/04/2024 HP Inc UK Limited Desktop Client Devices 01/09/2023 31/08/2027 - 700,000.00
24/04/2024 J H Civil Engineering Ltd Mini Comp - SLC NEC3 ECC Option B
– Tollbooth Lanark, Streetscape 22/06/2024 13/09/2024 - 294,800.60
25/04/2024 BCA Insulation Ltd Loft and Cavity Wall Insulation Meas-
ured Term Contract 27/05/2024 26/05/2026 26/05/2027 552,449.12
25/04/2024 Oracle Corporation UK Ltd Oracle Fusion Implementation 25/04/2024 24/10/2024 - 73,657.54
26/04/2024 Tarmac Building Products
Ltd 
Supply and Delivery of Cold Permanent
Pothole Repair - Viafix 29/04/2024 28/04/2026 28/04/2027 125,000.00
08/05/2024 Tenants Information Service
Provision of Independent Advice and
Development Support to customers in
South Lanarkshire
01/06/2024 30/11/2024 30/05/2025 90,000.00
165

Page 166

Award Date Supplier Description Start Date End Date Extension
Date Value
09/05/2024 Sense Scotland Daycare provision – Touchbase and
Springfield 01/04/2024 31/03/2027 31/03/2028 1,088,287.62
09/05/2024 Power Distribution Contract-
ing Ltd
Electromagnetic repairs to Non-Hous-
ing General Service Properties 03/06/2024 02/06/2026 02/06/2028 746,500.00
13/05/2024 Various Suppliers
Direct Award from the Framework
Agreement for the Provision of Passen-
ger Transport Services
14/08/2024 26/06/2025 - 74,100.00
14/05/2024 J H Civil Engineering Ltd
Wellhall Rd / Woodfoot Rd / Hillhouse
Rd, A723 Strathaven Rd / B755 Mill
Rd, Woodfoot Rd / Laighstonehall Rd/
Gateside Street Junction Improvements 
26/08/2024 29/09/2025 - 2,018,965.84
14/05/2024 A C Whyte & Co Ltd Mill Court, Rutherglen External Fabric
Upgrade 03/06/2024 07/04/2025 - 1,908,898.60
15/05/2024 Chubb Fire & Security Ltd Provision of a Shared Digital ARC
Technology Solution 17/05/2024 16/05/2028 16/05/2029 492,448.80
15/05/2024 Joseph Leckie & Sons Con-
tracts Ltd Nursery Soft Pore Replacement 01/05/2024 31/10/2024 - 159,845.50
17/05/2024 Computacenter (UK) Ltd Technology Peripherals and Infrastruc-
ture 10/06/2024 09/06/2026 09/06/2027 558,000.00
20/05/2024
Holeside Training Ltd,
Ringlink Services Ltd, Sib-
bald Ltd, Speedy Asset Ser-
vices Ltd
Provision of Access, Hand, Mobile and
Small Plant Operators Training 17/06/2024 16/06/2028 - 480,000.00
166

Page 167

Award Date Supplier Description Start Date End Date Extension
Date Value
21/05/2024
BJMCA Ltd t/a Bluebird Care
(South Lanarkshire), Cera
Care Operations Ltd, Con-
stance Care, Enable Scot-
land, JKL Care Services,
The Richmond Fellowship
Scotland Ltd, All New Begin-
nings Ltd, Angels Home
Care Lanarkshire Ltd, Be-
spoke Care Services Ltd,
Call-In Homecare Ltd, GMD
Community Service, HRM
Homecare Services Ltd, ION
Care and Support Services
Ltd, Keane Premier Support
Services, Precious Care Ser-
vices Ltd t/a My Homecare
Glasgow, SRS Care Solu-
tions (Central) Ltd.
Care at Home and Housing Support
Services Procured Services Arrange-
ment (PSA) – Phase 1
01/07/2024 30/06/2034 30/06/2039 714,300,000.00*
21/05/2024
Care Solutions Homecare
Ltd, Medd Care Services Ltd,
Adigo Care, Care1 Profes-
sional Services Ltd, Oncall
Care Services ltd, Trust
Community Care Limited
Care at Home and Housing Support
Services Procured Services Arrange-
ment (PSA) – Phase 3
08/11/2024 30/06/2034 30/06/2039 714,300,000.00*
21/05/2024 Lanes Group Plc Provision of Water Infrastructure Ser-
vices 03/06/2024 02/06/2028 - 883,000.00
24/05/2024 GMG Contractors Ltd External Fabric Works 03/06/2024 02/06/2026 02/06/2028 20,000,000.00
167

Page 168

Award Date Supplier Description Start Date End Date Extension
Date Value
28/05/2024 Insight Direct (UK) Ltd Microsoft Enterprise Licensing Agree-
ment 01/07/2024 30/06/2027 - 5,000,000.00
30/05/2024 EDF Energy Customers Ltd
Scottish Procurement Supply of Elec-
tricity Framework Call-off from Scottish
Procurement Electricity Framework,
SP-21-052
01/04/2024 31/03/2026 31/03/2027 41,255,118.41
30/05/2024 Lifeways Community Care
Ltd
Adult Supported Living for Supported
Person 17/06/2024 16/06/2034 17/06/2039 10,968,739.61
30/05/2024 Various Suppliers Printing and Associated Services 15/05/2024 31/07/2027 31/07/2028 241,666.00
30/05/2024 Kiwa Ltd T/A Kiwa CMT Structural Specialist Investigation of
Transmission Lighting Columns 05/06/2024 04/06/2028 - 60,000.00
31/05/2024 Framework Suppliers Passenger Transport Mini Competition
1 14/08/2024 25/06/2025 25/06/2026 2,583,369.96
31/05/2024 Elliott Baxter & Company Ltd Supply and Delivery of Specialist Digi-
tal Paper 10/06/2024 09/06/2027 09/06/2028 280,000.00
07/06/2024 Rainbow International Environmental Cleaning & Decontami-
nation Works 10/06/2024 30/11/2024 - 50,000.00
10/06/2024 Various Suppliers Hire of Vehicles and Plant 14/06/2024 20/02/2026 - 3,600,000.00
11/06/2024 Covanburn Contracts Ltd
NEC3 ECSC for Scottish Government
Play Investment Programme - Ruther-
glen and Cambuslang
22/07/2024 27/09/2024 - 326,284.24
11/06/2024 P F Cusack (Tools Supplies)
Ltd
Supply and Delivery of Temporary
Signs and Associated Products 20/06/2024 19/06/2028 - 115,240.00
168

Page 169

Award Date Supplier Description Start Date End Date Extension
Date Value
14/06/2024 Various Suppliers Supply and Delivery of Vehicle Parts 14/06/2024 31/03/2025 - 1,500,000.00
14/06/2024 Blantyre Park Services Ltd Castlefield Gardens SH – Ventilation
Upgrade 12/08/2024 29/11/2024 - 148,645.79
14/06/2024 Framework Suppliers Passenger Transport Mini Competition
1/2 14/08/2024 25/06/2025 - 55,079.10
17/06/2024 Affiniti Response Ltd Hamilton Towers Structural Repairs 08/07/2024 16/08/2024 - 184,444.42
19/06/2024 Joinery & Timber Creations
(65) Ltd
Supply and Delivery of Kitchens includ-
ing Surveys 01/07/2024 30/06/2026 30/06/2028 8,000,000.00
19/06/2024 Central Demolition Ltd Demolition of Lindsay House East Kil-
bride 01/08/2024 30/01/2025 - 176,351.00
21/06/2024 Framework Suppliers Passenger Transport Mini Competition
2 14/08/2024 25/06/2025 25/06/2026 2,408,977.13
25/06/2024 Hugh L S McConnell Ltd Refurbishment Works / Aids and Adap-
tations 08/07/2024 07/07/2027 07/07/2028 4,800,000.00
26/06/2024 Chubb Fire & Security Ltd Warden Call System Upgrades 08/07/2024 31/12/2026 - 781,866.68
26/06/2024 Jadu Creative Ltd SLC Website Hosting 01/04/2024 31/03/2026 31/03/2027 311,247.62
26/06/2024 Swarco Smart Charging Ltd Direct Award – EV Charging Infrastruc-
ture Service Contract Renewal 01/03/2024 31/12/2025 - 74,258.32
27/06/2024 Mastek Systems Company
Ltd Support Services for Oracle Fusion 09/07/2024 08/07/2026 08/07/2027 600,000.00
169

Page 170

Award Date Supplier Description Start Date End Date Extension
Date Value
28/06/2024 Softcat Plc Provision of Microsoft Support Services 01/07/2024 30/06/2027 - 121,974.00
03/07/2024
Flexible Healthcare One So-
lution Ltd, Invercare Services
Ltd, Lica Homecare Ltd,
Love@Care Ltd
Care at Home and Housing Support
Services Procured Services Arrange-
ment (PSA) – Phase 2
01/07/2024 30/06/2034 30/06/2039 714,300,000.00*
04/07/2024 Clearview Intelligence Ltd Supply, Installation and Maintenance of
Traffic Counting Equipment 02/08/2024 01/08/2029 01/08/2031 958,754.47
04/07/2024 Framework Suppliers Passenger Transport Mini Competition
5 14/08/2024 25/06/2025 25/06/2026 409,378.18
04/07/2024 Framework Suppliers Passenger Transport Mini Competition
3 14/08/2024 25/06/2025 25/06/2026 349,923.00
04/07/2024 Framework Suppliers Passenger Transport Mini Competition
4 14/08/2024 25/06/2025 25/06/2026 133,098.80
05/07/2024 Under the Trees Limited Education Services Procured Service
Arrangement: phase 4 20/12/2021 19/12/2026 19/12/2031 42,500,000.00*
05/07/2024 GMG Contractors Ltd External Wall Installations Fabric
Works 15/07/2024 14/07/2026 14/07/2028 20,000,000.00
05/07/2024 Actian Europe Limited Licences for Academy Housing System 01/12/2023 30/11/2026 - 630,000.00
10/07/2024 Joseph Leckie & Sons Con-
tracts Ltd
Hawbank Depot- 1 No 6 Man Carriage-
way Patching Squad 15/07/2024 30/08/2024 - 80,890.00
16/07/2024 Prime Build Solutions Ltd Mote Hill Retaining Walls Phase 2
HGF011492.001 26/08/2024 01/11/2024 - 74,987.00
170

Page 171

Award Date Supplier Description Start Date End Date Extension
Date Value
17/07/2024 Various Suppliers Supply and Delivery, Maintenance and
Repairs of Cleaning Equipment 22/07/2024 21/07/2028 - 320,000.00
18/07/2024
Michelle's Childminding,
Hay's Childminding, Karen
McCue, Cright Sparks
Childminding, Dawn's
Childminding, Linsay Scott,
Marie's Childminding Service
Early Learning and Child Care PSA
phase 10 01/04/2020 31/07/2030 - 143,500,000.00
18/07/2024 John McGeady Ltd
Planer and Paver Hire and Works with
Operator including Supplementary
Plant
22/07/2024 21/07/2027 21/07/2030 4,430,957.80
22/07/2024 Velocity UK Limited Application of Rhinophalt Preservative
Road Treatment 29/07/2024 06/09/2024 - 105,299.44
25/07/2024 Various Suppliers Supply, Delivery & Installation of Com-
mercial Catering Equipment 09/08/2024 31/05/2027 - 1,030,050.00
25/07/2024 Elveden Farms Ltd Supply and Delivery of Christmas
Trees 08/08/2024 31/12/2026 31/12/2028 277,955.90
25/07/2024 Gl Education Group Ltd
Provision of Literacy, Numeracy, Health
and Wellbeing Educational Assessment
Resources
01/08/2024 31/07/2025 01/08/2026 215,250.00
30/07/2024 Therapeutic Counselling Ser-
vices Ltd Play Therapy   12/08/2024 11/08/2025 - 80,000.00
01/08/2024 Framework Suppliers Passenger Transport Mini Competition
6 14/08/2024 25/06/2025 25/06/2026 383,874.10
06/08/2024 Econ Engineering Ltd Hire of 12, 18 and 26 Tonne Gritters for
Winter Maintenance 01/10/2024 01/04/2025 - 220,584.00
171

Page 172

Award Date Supplier Description Start Date End Date Extension
Date Value
06/08/2024 Land Use Consultants Ltd                                                                                                                                                                                            Outdoor Recreation and Adventure
Tourism 12/08/2024 31/01/2025 - 65,462.96
07/08/2024 Valtech Ltd Blue Badge Central Record and Badge
Ordering Services 05/08/2024 04/08/2027 04/08/2029 64,915.68
08/08/2024 Veolia CHP UK Ltd Maintenance of Combined Heat and
Power Unit (CHP) at Dollan Aqua 19/08/2024 18/08/2029 18/08/2034 260,206.80
08/08/2024 Joseph Leckie & Sons Con-
tracts Ltd
NEC3 ECSC for Donaldson Street,
Hamilton 16/08/2024 31/10/2024 - 109,584.75
09/08/2024 Computacenter (UK) Ltd Online Benefits Calculator 01/08/2024 31/07/2026 31/07/2027 66,476.92
14/08/2024 Computacenter (UK) Ltd Safety Management System including
Auditing and Inspection Software 19/08/2024 30/09/2029 - 141,654.32
14/08/2024 Computacenter (UK) Ltd Web Security Gateway Licences 02/10/2024 01/10/2025 - 78,982.43
15/08/2024 Careium UK Ltd Telecare Peripheral Equipment 15/08/2024 14/08/2026 14/08/2027 711,656.00
21/08/2024 Computacenter (UK) Ltd Software Solution for Grounds, Street
Cleansing & Waste Services 01/10/2024 30/09/2028 30/09/2029 370,146.85
22/08/2024 Civica UK Ltd Provision of a Sundry Debtors System 04/08/2024 03/08/2029 03/08/2034 172,870.72
23/08/2024 Routes To Work South 2024/2025 employability services 01/04/2024 31/03/2025 - 2,263,000.00
23/08/2024 The Lilias Graham Trust Parenting Capacity Assessment 02/09/2024 24/01/2025 - 148,121.20
172

Page 173

Award Date Supplier Description Start Date End Date Extension
Date Value
28/08/2024 Oxed & Assessment Ltd Nuffield Early Language Intervention   16/08/2024 15/08/2025 15/08/2026 243,560.00
28/08/2024 Covanburn Contracts Ltd Maintenance of 4 No. Structures on EK
Main Line 24/02/2025 28/03/2025 - 174,085.00
02/09/2024 TURNER & TOWNSEND
PROJECT
Project Management Team Centre
West 10/09/2024 31/08/2028 - 614,622.74
03/09/2024 Landcare Solutions (Scot-
land) Ltd
NEC3 Engineering and Construction
Short Contract for McKirdy Park Play
Area, Community Garden and Outdoor
Gym
02/09/2024 30/11/2024 - 251,705.30
04/09/2024 Advance Construction (Scot-
land) Ltd Hairmyres Park and Ride 05/09/2024 27/06/2025 - 5,054,488.79
05/09/2024 Leaseplan UK Ltd Contract Hire/Lease of Light Vehicles 01/08/2024 31/07/2025 - 384,025.03
10/09/2024 Civica UK Ltd Income Management System / Online
Cashless Payments 14/09/2024 13/09/2029 13/09/2031 1,284,663.56
10/09/2024 Stepford Contracts Ltd Telford Road Lock Ups – Resurfacing
& Lighting 14/10/2024 25/11/2024 - 196,908.00
11/09/2024 Blantyre Park Services Ltd Mill Street & Parker Place Boiler 01/10/2024 04/02/2025 - 245,160.12
12/09/2024 Penna Plc Recruitment Advertising and Public In-
formation Notices 23/09/2024 22/09/2028 22/09/2029 102,357.72
12/09/2024 Kentallen Mechanical Ser-
vices Ltd Clydeford View – Suspended Ceiling 30/09/2024 25/11/2024 - 97,003.30
173

Page 174

Award Date Supplier Description Start Date End Date Extension
Date Value
17/09/2024 Advanced Case Manage-
ment Solutions
Advice Pro Case Management Soft-
ware - Money Matters 01/10/2023 30/09/2026 30/09/2027 112,257.82
18/09/2024 Zap Entertainment Ltd Christmas Lights Switch on Events 02/10/2024 01/10/2027 01/10/2029 348,000.00
18/09/2024 The Salvation Army Trustee
Company Homelessness Out of Hours Service 01/10/2024 31/03/2025 30/09/2025 122,914.00
19/09/2024 First Steps Future Training
Ltd
Mini Competition for YES Construction
Tasters South Lan Wide 2024 31/10/2024 30/10/2025 - 132,796.80
23/09/2024 THE RICHMOND FELLOW-
SHIP SCOTLAND
Care Home Service for Adults with
Learning Disabilities – Cherry Tree
Court
01/04/2024 31/03/2029 31/03/2031 22,817,154.43
23/09/2024 Various Suppliers Provision of Winter Assistance (Snow
Ploughing & Gritting) 01/10/2024 30/09/2029 29/09/2032 132,522.00
24/09/2024 Covanburn Contracts Ltd 103 Strathaven Road – Retaining Wall
– Retender 14/10/2024 09/12/2024 - 63,971.37
25/09/2024
Blossom with Nurture,
Clydesdale Community Initi-
atives, Fare Scotland Ltd,
Kooth Digital Health,
MacLaughter, Outlet Play
Resource, Royal Bilnd, Ven-
ture Trust, Field Studies
Council, ACER International
UK Ltd., Mathermatices Re-
covery Council UK and Ire-
land, UTeach Ltd Scottish
Online Lessons
Education Services Procured Service
Arrangement: phase 5 20/12/2021 19/12/2026 19/12/2031 42,500,000.00*
174

Page 175

Award Date Supplier Description Start Date End Date Extension
Date Value
26/09/2024 South Lanarkshire College Employability Academy 01/10/2024 30/09/2025 30/09/2026 420,000.00
26/09/2024 Civica Uk Ltd Legal Case Management System 30/09/2024 29/09/2029 29/09/2031 179,972.55
01/10/2024 Cromwell Polythene Ltd Supply and Delivery of Refuse Sacks 08/10/2024 07/10/2028 - 461,727.02
01/10/2024 RACAM Security & Commu-
nications Ltd
Fault Finding and Repair of Property
Based CCTV Systems and New Instal-
lations
08/10/2024 07/10/2026 07/10/2028 400,000.00
03/10/2024 Stantec Uk Ltd 2024-25 - Principal Inspection of Struc-
tures with Difficult Access 14/10/2024 14/03/2025 - 219,314.00
03/10/2024 Robert Potter And Partners
Ltd
Professional Services for Cathcart
Road Net Zero 21/10/2024 31/10/2025 - 84,265.00
03/10/2024 M Squared (Scotland) Ltd Roads & Infrastructure Works on Cam-
nethan Street, Stonehouse 14/10/2024 21/12/2024 - 80,337.33
10/10/2024 St Philips Care Caledonia
Ltd
Care Home for Adults with Mental
Health Difficulties, Neurodiverse and
Learning Difficulties – Catalina House
01/10/2024 30/09/2027 30/09/2028 333,331.45
12/10/2024 Advanced Case Manage-
ment Solutions
Advice Pro Case Management System
Licenses Software and Support (Em-
ployability)
01/05/2023 30/04/2026 30/04/2028 117,249.41
17/10/2024 Mental Health Care (Uk) Specialist Residential Care- Pine Cot-
tages 01/11/2024 31/10/2027 - 870,368.60
17/10/2024 NHS Lanarkshire Provision of Moving and Assisting
Training 28/10/2024 27/10/2027 27/10/2029 332,611.44
175

Page 176

Award Date Supplier Description Start Date End Date Extension
Date Value
17/10/2024 The Disabilities Trust Specialist Residential Care for CM-
7199061 at Graham Anderson House 15/10/2024 14/04/2025 14/10/2025 258,311.64
17/10/2024 South Lanarkshire Leisure &
Cul Ltd
Provision of Outdoor Learning Activities
for Family Support Hubs, Children and
Young People
04/11/2024 03/11/2027 03/11/2029 125,000.00
28/10/2024 MGM Timber ( Scotland) Ltd Supply and Delivery of Wall Panels 04/11/2024 03/11/2027 03/11/2028 80,569.44
31/10/2024 Voluntary Action South Lan-
arkshire Volunteering for Employability 01/04/2024 31/03/2025 31/03/2026 180,000.00
01/11/2024 Catch Scotland Accommodation and Intensive Support
for Young People 01/11/2024 31/10/2026 31/10/2028 1,119,195.36
04/11/2024 Various Suppliers Provision and Delivery of Washroom
Solutions and Sanitary Products   11/11/2024 10/11/2028 - 1,935,129.00
04/11/2024 Covanburn Contracts Ltd Coalburn Recreation Area Tennis Court
Redevelopment 11/11/2024 27/01/2025 - 295,295.45
08/11/2024 Saltire Facilities Manage-
ment Ltd
Fixed Electrical Testing Programme
and Remedials 25/11/2024 24/11/2025 24/11/2026 184,444.42
11/11/2024 Covanburn Contracts Ltd Hamilton BU Woodstore 25/11/2024 20/12/2024 - 51,843.00
13/11/2024 TD Tree & Land Services Ltd Tree Surgeon Works for Trees affected
by Ash Dieback Disease 18/11/2024 31/01/2025 - 87,870.00
14/11/2024 Therapeutic Counselling Ser-
vices Ltd Primary School Counselling 01/12/2024 30/11/2026 - 120,000.00
14/11/2024 Oracle Corporation Uk Ltd Oracle CRM Support 01/09/2024 31/08/2026 - 65,713.52
176

Page 177

Award Date Supplier Description Start Date End Date Extension
Date Value
18/11/2024 Vivedia Limited Crematorium AV Equipment 18/11/2024 17/11/2029 - 286,000.00
21/11/2024 King Communications & 
Security Ltd
Maintenance of Fire and Intruder
Alarms 09/12/2024 08/12/2027 08/12/2028 1,200,000.00
22/11/2024 Tenants Information Service
Provision of Independent Advice and
Development Support to Customers in
South Lanarkshire
01/12/2024 30/11/2026 30/11/2027 159,845.50
25/11/2024 Ailsa Building Contractors
Ltd Lockups Refurbishment Works 03/03/2025 18/08/2025 - 380,997.26
25/11/2024 Landscapes & Contracts Ltd Galloway Drive – Retaining Wall 13/01/2025 21/02/2025 - 68,794.79
26/11/2024 W I & A Gilbert Ltd Elvanfoot Bridge Refurbishment 03/03/2025 28/03/2025 - 58,895.03
27/11/2024 South Lanarkshire College Delivery of Foundation Apprenticeships 27/08/2024 28/05/2026 - 256,179.00
27/11/2024 New College Lanarkshire GradU8 Programme 26/08/2024 04/04/2025 - 80,000.00
27/11/2024 South Lanarkshire College GradU8 Programme 26/08/2024 04/04/2025 - 80,000.00
28/11/2024 Motus Commercials Supply and delivery of Heavy Vehicles 02/12/2024 31/01/2025 - 594,860.00
29/11/2024 James Scott & Sons Kitchen
Equipment Ltd
Kirktonholme Primary School (Supply &
Installation of Kitchen Equipment) 06/01/2025 28/03/2025 - 55,477.00
04/12/2024 Computacenter (Uk) Ltd Mobile Device Management - Omnissa
Workspace ONE 29/01/2025 28/01/2026 - 130,200.00
177

Page 178

Award Date Supplier Description Start Date End Date Extension
Date Value
06/12/2024 Helen Kane HCM Limited HR Support – HCM Hypercare and
Redwood Implementation 01/11/2024 31/05/2025 31/08/2025 86,100.00
12/12/2024 Various Suppliers Adult Supported Living: phases 5 & 6 01/03/2020 14/09/2035 - 242,837,766.00
12/12/2024 Maxi Construction Ltd Lanark Library Roof & Window Re-
placement 10/02/2025 05/07/2025 - 574,733.37
13/12/2024 Ochil Tower School Residential Placement (AS) at Ochil
Tower School 01/08/2024 31/07/2025 - 222,450.40
16/12/2024 Bentley Systems (Uk) Ltd Exor Roads Management Support 25/01/2025 31/12/2025 - 197,314.70
17/12/2024 The Spark (Scotland) 1 to 1 Counselling Services for Second-
ary School pupils  14/08/2024 13/08/2026 13/08/2027 388,800.00
23/12/2024 Action For Children Services
Ltd Intensive Family Support Service 06/01/2025 05/04/2028 05/04/2030 4,335,526.00
24/12/2024 Sense Scotland Short Break and Respite Service for
Adults with Learning Disabilities 01/04/2025 31/03/2027 31/03/2028 2,940,196.76
27/12/2024 Motus Commercials Supply and delivery of Heavy Vehicles 27/12/2024 31/01/2025 - 360,350.00
27/12/2024 Landscapes & Contracts Ltd
Woodside PS Kitchen Alterations & Ex-
tension Work – Groundworks Including
Pilling
09/12/2024 31/03/2025 - 74,476.95
07/01/2025 Civica Uk Ltd Civica Tranman Fleet Management
System 01/08/2023 30/09/2028 30/09/2029 165,340.00
15/01/2025 SSI Schaefer Plastics Uk Ltd Supply and Delivery of 2 Wheeled Bins 15/01/2025 14/07/2025 - 257,000.00
178

Page 179

Award Date Supplier Description Start Date End Date Extension
Date Value
15/01/2025 Covanburn Contracts Ltd Wooddean Park Wetland and Path In-
frastructure Works, Phase 2 03/03/2025 02/05/2025 - 99,445.91
16/01/2025 Storm Environmental Ltd Direct Award for Supply and Delivery of
Communal Recycling Bins 20/01/2025 31/01/2025 - 148,888.80
21/01/2025 Ailsa Building Contractors
Ltd
Forrest Place, Crossford, Carluke –
RAAC Removal 03/03/2025 28/03/2025 - 120,672.87
23/01/2025 Aspect Contracts Ltd              Removal of Asbestos and Remedial
Works 23/01/2025 22/01/2026 - 4,400,000.00
23/01/2025 Renfrewshire Council Procured Spend Review   27/01/2025 26/01/2027 - 200,000.00
28/01/2025 B Squared Ltd Tracking and Monitoring ASN Individual
Milestones 05/02/2025 04/02/2027 04/02/2028 53,826.00
29/01/2025 Storm Environmental Ltd Supply and Delivery of 1100 L & 1280
L - 4 Wheeled Bins 29/01/2025 08/12/2025 - 60,000.00
03/02/2025 Rm Education Ltd Educational Digital Futures – Education
ICT Managed Service 01/10/2025 30/09/2032 30/09/2037 53,500,000.00
03/02/2025 Broxap Ltd Supply and Delivery of Litter Bins 06/02/2025 31/03/2025 - 65,800.00
05/02/2025 Enva Organics Recycling Ltd The Receipt and Treatment of Organic
Waste  01/04/2025 31/03/2027 - 400,345.16
06/02/2025 The Salvation Army Trustee
Company
Ukrainian Displaced Persons Accom-
modation Service 01/04/2025 30/09/2025 31/03/2026 196,908.00
179

Page 180

Award Date Supplier Description Start Date End Date Extension
Date Value
07/02/2025 Racam Security & Communi-
cations Ltd
South Lanarkshire Council CCTV Infra-
structure Upgrade Phase 2 - Installa-
tion Works for Cameras and Network
Upgrade
17/02/2025 31/03/2027 31/03/2029 251,594.68
12/02/2025 Park's Of Hamilton (Town-
head Garage) Ltd
Supply and Delivery of Light Vehicles
for the 2024 – 2025 financial year 12/02/2025 30/05/2025 - 1,841,559.40
12/02/2025 Motus Commercials Supply and delivery of Heavy Vehicles 12/02/2025 30/05/2025 - 714,669.00
12/02/2025 Industrial Floor Treatments
Ltd Blantyre Fleet Depot 06/05/2025 19/08/2025 - 226,626.66
13/02/2025 GMG Contractors Ltd Emergency Roofing Repairs 24/02/2025 23/02/2026 23/02/2027 97,003.30
18/02/2025 Greenhill Outdoors Ltd Early Learning and Child Care PSA:
phase 11 01/04/2020 31/07/2030 - 143,500,000.00
19/02/2025 Jobling Purser Ltd Supply and Delivery of Bitumen Prod-
ucts 24/02/2025 23/02/2027 23/02/2029 80,891.60
20/02/2025 Oracle Corporation UK Ltd Oracle - Technical Support Services 06/04/2025 05/04/2026 - 189,260.93
25/02/2025 Pulse Fitness Ltd
Supply & delivery of SLLC Fitness
Equipment – Lot 1 Gym Equipment
Cardiovascular and Resistance
28/02/2025 27/02/2030 - 1,080,148.76
25/02/2025 Pulse Fitness Ltd Supply & delivery of SLLC Fitness
Equipment – Lot 2 Cycling 28/02/2025 27/02/2030 - 190,165.13
25/02/2025 Engage Process Ltd Cloud Hosted Process Mapping Soft-
ware 01/03/2025 29/02/2028 - 92,432.50
180

Page 181

Award Date Supplier Description Start Date End Date Extension
Date Value
25/02/2025 Pulse Fitness Ltd Supply & delivery of SLLC Fitness
Equipment – Lot 3 Free Weights 28/02/2025 27/02/2030 - 76,194.07
26/02/2025 Swarco Smart Charging Ltd Direct Award – Contactless Compli-
ance Grant 28/02/2025 31/03/2025 - 123,049.80
27/02/2025 Marvtech Limited Hire, Service and Maintenance of Elec-
tric Hot Boxes 01/04/2025 31/03/2035 31/03/2040 408,000.00
27/02/2025 A M Phillip Trucktech Ltd Supply and delivery of Heavy Vehicles 27/02/2025 30/05/2025 - 394,121.05
03/03/2025 Highland Fuels Ltd The Supply and Delivery of Liquid
Fuels 01/04/2025 31/03/2027 - 5,200,000.00
03/03/2025 Ailsa Building Contractors
Ltd Emergency Roofing Repairs 10/03/2025 09/09/2025 09/03/2026 1,000,000.00
03/03/2025 Certas Energy Uk Ltd                               The Supply and Delivery of Liquid
Fuels 01/04/2025 31/03/2027 - 800,000.00
03/03/2025 Scottish Sports Council Trust
Company School Residential Trips to Inverclyde 12/08/2024 25/06/2026 - 147,307.65
04/03/2025 Blue Triangle (Glasgow)
Housing Family First Stop – Charles Brownlee 01/12/2024 30/11/2025 30/11/2026 1,104,833.02
04/03/2025 Blue Triangle (Glasgow)
Housing
First Stop Supported Accommodation -
Wide Close 01/12/2024 30/11/2025 30/11/2026 602,347.71
04/03/2025 Blue Triangle (Glasgow)
Housing
Supported Accommodation - Clydes-
dale Street 01/12/2024 30/11/2025 30/11/2026 448,780.95
04/03/2025 Securigroup Services Ltd Security for Council Offices 01/04/2025 30/09/2025 31/03/2026 169,284.10
181

Page 182

Award Date Supplier Description Start Date End Date Extension
Date Value
05/03/2025 Sportex Group Ltd Design and Construction of 1 x 3rd
Generation Pitch at McKirdy Park 01/05/2025 24/07/2025 - 117,813.96
06/03/2025 Turner & Townsend Project Design and Delivery of the Clydesdale
Way Project 17/03/2025 23/07/2027 - 702,762.00
06/03/2025 Savills (UK) Ltd South Lanarkshire Data Centre Site
Analysis and Land Sale 14/03/2025 13/03/2026 - 95,000.00
07/03/2025 George Carruthers & Sons
Ltd
Supply and Delivery of Fresh Fruit and
Vegetables 01/04/2025 31/03/2028 31/03/2029 4,773,744.75
07/03/2025 Censis Technology Solutions
Ltd
Provision of Amazon Healthcare De-
vices & Support 01/04/2025 31/03/2026 - 160,000.00
10/03/2025
Community Volunteers Ena-
bling You Ltd, Dobe Ltd,
Maths Circle Ltd, Renais-
sance Learning UK Ltd,
Scripture Union Scotland,
SOEC, SU Scotland
Lendrick Muir, Synergy
Training Services Ltd, The
Verdancy Group Ltd, Ven-
ture Trust
Education Services Procured Service
Arrangement: phase 6 20/12/2021 19/12/2026 19/12/2031 42,500,000.00*
11/03/2025 Centrica Business Solutions
Uk Ltd
Maintenance of the Combined Heat
and Power Unit ("CHP") Unit at Lanark
Leisure Centre
17/03/2025 31/03/2035 - 195,284.93
12/03/2025 Sibcas Ltd Supply, Delivery and Hire of Secure
Site Containers and Welfare Units 17/03/2025 16/03/2026 16/03/2027 207,867.60
13/03/2025 Portakabin (Scotland) Ltd Modular Works at Priory Parks Pavillion 28/04/2025 29/08/2025 - 409,546.41
182

Page 183

Award Date Supplier Description Start Date End Date Extension
Date Value
13/03/2025 Softcat Plc Lease Accounting and Portfolio Man-
agement System 19/03/2025 25/05/2028 25/05/2029 68,617.60
14/03/2025 Turner & Townsend Project Country Parks Master Plan Phase 1
(White Bridge & Pump Track) 17/03/2025 16/03/2026 - 193,700.00
17/03/2025 IFS Uk Ltd IT Service Management System 01/03/2025 28/02/2027 - 160,000.00
18/03/2025 Enhance Living Support Ser-
vices Ltd
Adult Supported Living for Individual
Supported Person 17/03/2025 31/03/2026 31/03/2027 448,818.02
18/03/2025 Action For Children Services
Ltd The Blues Programme 01/04/2025 31/03/2026 31/03/2027 253,657.44
18/03/2025 The Salvation Army Trustee
Company Homelessness Out of Hours Service 01/04/2025 30/11/2025 31/07/2026 99,559.53
20/03/2025 Dawn Homes Limited Development and New Build Housing
at Dale Avenue, Cambuslang 28/04/2025 12/10/2026 - 3,500,000.00
21/03/2025 Adl Lift Services Ltd Modernisation of Passenger Lifts at
Brandon Gate 31/03/2025 24/11/2025 - 195,000.00
24/03/2025 Various Suppliers Passenger Transport Services Dy-
namic Purchasing System: phase 1 & 2 28/03/2025 27/03/2030 27/03/2033 99,531,097.00
24/03/2025 Lowmac Alloys Ltd                
Mini Competition for the Receipt and
Processing of Recyclate Waste - Con-
tainer Mix
01/04/2025 31/03/2028 31/03/2030 931,095.00
24/03/2025 Fujitsu Services ConSol Annual Maintenance and Tech-
nical Support 01/04/2025 31/03/2026 - 224,029.83
26/03/2025 IPL Plastics (Uk) Ltd T/A IPL
Hull Supply and Delivery of 2 Wheeled Bins 01/04/2025 31/07/2025 - 64,982.40
183

Page 184

Award Date Supplier Description Start Date End Date Extension
Date Value
26/03/2025 Covanburn Contracts Ltd Scottish Play Area Investment Pro-
gramme Bothwell & Uddingston 14/04/2025 02/06/2025 - 60,123.51
*represents the contract value over the life of the long term Procured Service Arrangement for all suppliers
184

Page 185

7.2. Appendix 2: Procurement Strategy 2023-2028 Strategic Objectives update 
Objective Aim Outcome  Progress
Compliance Ensure compliance with
Procurement Regulations
and the Council’s
Standing Orders on
Contracts
Improve compliance and
mitigate risk of contract
challenge. 
Procurement continues to monitor compliance with
regulations and Standing Orders on Contracts across the
Council, as evidenced by
• Implementation of new procurement and purchasing
arrangements under Oracle Fusion, including elec-
tronic authorisation of contracts. 
• Action plan to address compliance issues across
specific targeted areas
Value for
Money
To secure Best Value,
balancing cost and quality
of service and support the
Council in achieving
budget savings 
Improved Value for Money
in support of the Council's
Financial Strategy
We continue to work with Resources in recognising
demand and cost drivers and identifying opportunities for
efficiencies, as evidenced by:
• Procured Spend review under Council’s Transforma-
tional Review Programme achieving savings of £2.5m
to date
• Management of price increase requests given inflation-
ary and eNIC pressures. 
Collaborative Identify and influence
collaborative opportunities
to work with public
partners and drive value
through the power of
public sector procurement. 
Improved levels of
collaborative activity and
delivery of efficiencies 
We continue to engage with procurement partners to
identify collaborative opportunities and influence
development of collaborative working, as evidenced by: 
• 90% participation in Scotland Excel frameworks
• Positive engagement with Scottish Procurement Alli-
ance, Procurement for Housing and Hub Southwest 
185

Page 186

Contract and
Supplier
Management
Support Resources to
take a proactive approach
to contract and supplier
management to achieve
innovation and value in
contract delivery. 
Ensure suppliers meet
contractual obligations, drive
improvements in supplier
performance and achieve
efficiency improvements. 
We can demonstrate an improved approach to contract and
supplier management, as evidenced by:
• Improved levels of engagement with Social Care 
providers 
• Development of new electronic performance appraisal
arrangements in Oracle Fusion. 
• Increased engagement to drive value in contracts
through Procured Spend Review
Fair Work
First
Work with suppliers to
implement Fair Work First
standards, including
payment of the Living
Wage and compliance
with Council Charters 
Improved Fair Work and
Living Wage arrangements
for those involved in delivery
of Council contracts 
We continue to promote Fair Work First and payment of the
Living Wage, as evidenced by:
• Annual confirmation of payment of Living Wage in all
Social Care contracts
• Continued focus on Fair Work First recommendations
from Scottish Government included in all appropriate
tenders. 
Sustainable
and Ethical
Secure wider social,
economic and
environmental benefits
through contracts as set
out in the Sustainable
Procurement Duty 
Meet the Sustainable
Procurement Duty 
Procurement continues to self-assess progress using the
Scottish Government’s Flexible Framework to assess the
organisational approach to sustainable procurement. 
• Rollout of sustainable procurement training to Resource
contract managers.
• Training for procurement team on Whole Life Costing.  
Community
Wealth
Building
Support and encourage
the local economy to grow
sustainably through the
effective use of
procurement to develop
local communities and
maximise use of
Community Benefits
Ensure the spending power
of the Council and
Community Benefits
contribute towards
Community Wealth and
achieve National Outcomes
Procurement contributes to the local spend pillar under the
Community Wealth Building Strategy, as evidenced by: 
• Demonstrating increased levels of local spend in
2024/2025. 
• Improving performance in commitment and delivery of
Community Benefits, including Community wishes. 
186

Page 187

7.3. Appendix 3: Planned Future Regulated Procurements 2025/2026 and 2026/2027 
Contract Description Expected Award
Date
Estimated Value
(£)
Servicing and Maintenance - Laundry Equipment 01/04/2025 £100,000
Provision of Security for Offices 01/04/2025 £100,000
Residential Trips for Education 01/04/2025 £150,000
Supply of Grounds Equipment 01/04/2025 £300,000
Supply and Delivery of 4 Wheeled Bins 01/04/2025 £400,000
Legal Services Providers 01/04/2025 £670,000
Installation Street Lighting Columns 01/04/2025 £2,000,000
Langlands Moss Path Access Route Upgrade 04/04/2025 £80,000
End User Services 05/04/2025 £2,400,000
Care Homes for Adults with Learning Disabilities including Autism 06/04/2025 £700,000
187

Page 188

Contract Description Expected Award
Date
Estimated Value
(£)
Supply and Delivery of Catering Sundries (Disposables) 06/04/2025 £1,000,000
Supply and Delivery of Street Lighting Materials (TRT Lanterns) 08/04/2025 £50,000
Supply and Delivery of Grounds and Plant Equipment 09/04/2025 £100,000
Utilities - Natural Gas Framework 09/04/2025 £50,000,000
Burial and cremation software system 14/04/2025 £300,000
Employee salary sacrifice, additional voluntary contributions 15/04/2025 £200,000
Counselling, Support and Advice Services 15/04/2025 £1,800,000
Supply and Delivery of Domestic Furniture and Furnishings 17/04/2025 £18,000,000
Land Led Development and New Build Housing (Dale Avenue) 30/04/2025 £3,500,000
Kirkmuirhill Play Area Play Investment Upgrades 30/04/2025 £112,000
Glespin Play Area Redevelopment Play Investment Upgrades 30/04/2025 £160,000
188

Page 189

Contract Description Expected Award
Date
Estimated Value
(£)
East Kilbride Area Play Investment Upgrades 30/04/2025 £900,000
Ground Investigation Framework 30/04/2025 £1,600,000
Supply and Delivery of 2 Wheeled Bins 12/05/2025 £390,000
Respite Support Service 12/05/2025 £600,000
Hamilton Town Square 15/05/2025 £200,000
Supply & Delivery of Library Books / Textbooks / Multimedia supplies 22/05/2025 £100,000
Early Learning Unit Demolition 30/05/2025 £100,000
PCS Digital Care System 02/06/2025 £250,000
Supply & delivery of SLLC Fitness Equipment 03/06/2025 £200,000
Boilers, Radiators and Associated Products 04/06/2025 £2,000,000
Blantyre Library Refurbishment 05/06/2025 £200,000
189

Page 190

Contract Description Expected Award
Date
Estimated Value
(£)
Supply and Delivery of Ceramic Tiles and Accessories 05/06/2025 £200,000
Philipshill Cemetery Path Renovation Works 07/06/2025 £50,000
Metal Roofing 17/06/2025 £2,000,000
Maintenance of Sewage Treatment Systems 20/06/2025 £600,000
Electrical Safety Management Audits 20/06/2025 £50,000
Gas Safety Management Audits 20/06/2025 £50,000
Primary School Paint Works 23/06/2025 £50,000
Microsoft Office 365 Backup and Recovery Solutions 23/06/2025 £300,000
Hire of Gritters for Winter Maintenance. 23/06/2025 £300,000
Supply and Delivery of Catering Sundries 27/06/2025 £770,000
Septic Tank Replacement: Auldhouse PS 30/06/2025 £100,000
190

Page 191

Contract Description Expected Award
Date
Estimated Value
(£)
Law Primary School refurbishment 30/06/2025 £100,000
Millheugh Bridge refurbishment 30/06/2025 £200,000
Supply and Delivery of Catering Sundries 30/06/2025 £775,900
Disabled Adaptation Materials 30/06/2025 £1,500,000
Timber Materials 30/06/2025 £2,500,000
Housing support for individuals in Extra Sheltered Housing 01/07/2025 £4,000,000
Supply, Delivery and Installation of Furniture for Challenging Environments 03/07/2025 £2,450,000
Supply and Delivery of Fresh Fruit and Vegetables (Fresh and pre-prepared) 03/07/2025 £5,000,000
Land Sensitivity Study 03/07/2025 £100,000
Fencing Works Measured Term Contract 2025-2027 04/07/2025 £800,000
Installation and Testing of Roof Safety Systems 07/07/2025 £50,000
191

Page 192

Contract Description Expected Award
Date
Estimated Value
(£)
The Supply & Delivery of Body Storage Trays 09/07/2025 £50,000
Supply of Swimming Pool Chemicals 09/07/2025 £276,618
Customer Feedback Services 11/07/2025 £50,000
Digital Mental Health 17/07/2025 £298,076
Supply and Delivery of Groceries and Provisions 22/07/2025 £1,000,000
Braidwood Park Play Area Redevelopment 23/07/2025 £120,000
Installation and Maintenance of Vending Machines 28/07/2025 £70,000
Electronic Payment Services 28/07/2025 £550,000
Supply and Delivery of Road Marking Materials (Screed) 29/07/2025 £242,000
Quick Quote for Supply and Delivery of Street Lighting Materials 29/7/2025 £50,000
Energy and Retrofit One Stop Shop - All Council areas 31/07/2025 £200,000
192

Page 193

Contract Description Expected Award
Date
Estimated Value
(£)
Country Parks Master Planning - Bike Pump Track 31/07/2025 £100,000
Country Parks Master Planning - White Bridge 31/07/2025 £200,000
St Hilary's Primary School MUGA 31/07/2025 £200,000
Supply and Delivery Street Lighting materials 31/07/2025 £200,000
SLLC Front of House IT Solution 31/07/2025 £500,000
Scottish Government Play Investment Programme 31/07/2025 £1,000,000
Supply and Delivery of Composite/UPVC Doors and UPVC Windows 31/07/2025 £2,000,000
Secondary School Counselling Services 01/08/2025 £388,000
Groundworks Harriet Street site 01/08/2025 £1,000,000
Mini competitions Passenger Transport for 25/26 school year 01/08/2025 £5,000,000
Education Materials 01/08/2025 £7,000,000
193

Page 194

Contract Description Expected Award
Date
Estimated Value
(£)
Educational Materials - all Lots 11/08/2025 £4,000,000
Supply, Delivery, Servicing and Maintenance of Fire Safety Products 14/08/2025 £600,000
Provision of Asbestos Consultancy 17/08/2025 £450,000
Homelessness - Supported Accommodation (Social Bite) 27/08/2025 £2,000,000
South Vennel roof replacement 30/08/2025 £100,000
Civil and Structural Engineering Services 30/08/2025 £250,000
Mechanical Engineering Services 30/08/2025 £350,000
Maintenance of Lightning and Surge Protection Systems 31/08/2025 £194,000
MFD Corporate Network 31/08/2025 £3,000,000
Council HQ door replacement 01/09/2025 £100,000
Hire of Waste Disposal Skips 12/09/2025 £2,705,000
194

Page 195

Contract Description Expected Award
Date
Estimated Value
(£)
Installation of Electric Vehicle (EV) Charging Units 24/09/2025 £100,000
Overtoun Bandstand Restoration Works 30/09/2025 £400,000
Supply and Delivery of Cleaning Equipment & Accessories 30/09/2025 £200,000
St Leonards Heat Network - Servicing and Billing 30/09/2025 £250,000
Double Glazed Units Supply and Delivery 30/09/2025 £384,921
General Roofing Works 30/09/2025 £500,000
Concrete Repairs 30/09/2025 £500,000
Supply and Delivery of Vehicle Parts 30/09/2025 £750,000
Purchase of Heavy Vehicles 30/09/2025 £1,300,000
SLC Phase 4 Demolition 30/09/2025 £1,275,000
Mini Competition for the Receipt, Treatment and Processing of Bulky Waste 30/09/2025 £10,785,912
195

Page 196

Contract Description Expected Award
Date
Estimated Value
(£)
Web Security Gateway Licences 01/10/2025 £78,982
Supply and Delivery of School Dining Tables 01/10/2025 £80,000
Supply and Delivery of Vehicle Parts 01/10/2025 £600,000
Postal Services - Physical and Hybrid Mail 04/10/2025 £1,000,000
Kitchen Flooring 06/10/2025 £2,000,000
Supply and Delivery of Industrial Gases 21/10/2025 £50,000
Country Park - Calderglen Pump Track Works 30/10/2025 £700,000
Supply, Delivery and Installation of Education and Office Furniture 31/10/2025 £1,000,000
Land Led Development and New Build Housing (Backmuir Road) 31/10/2025 £6,000,000
Land Led Development and New Build Housing (Reid Street) 31/10/2025 £6,000,000
Feasibility study for a heat network comprising public sector anchor load 01/11/2025 £55,000
196

Page 197

Contract Description Expected Award
Date
Estimated Value
(£)
Professional Services - Produce 12 Urban Woodland Management Plans (UWMP) within South
Lanarkshire 01/11/2025 £140,000
Supply of Cleaning Equipment - Scrubber Dryers 01/11/2025 £230,000
John Cumming 3G Pitch Refurbishment 01/11/2025 £449,000
Lanark Interchange Project 01/11/2025 £1,100,000
New Build Housing Project at former Lindsay House, East Kilbride 02/11/2025 £3,000,000
New Build Housing at Former Ballgreen Hall, Strathaven 03/11/2025 £3,000,000
Cashless Catering Solution 06/11/2025 £550,000
Design, Supply, and Installation of Gas Central Heating Systems 14/11/2025 £80,000
Mobile Client Devices 15/11/2025 £2,400,000
Supply and Delivery of Bollards and Verge Markers 30/11/2025 £279,980
Assistive Technology Installation 30/11/2025 £296,340
197

Page 198

Contract Description Expected Award
Date
Estimated Value
(£)
Hamilton Vogue Demolition 30/11/2025 £150,000
Quick Quote for Works: Groundworks Measured Term Contract 2025 -2027 01/12/2025 £2,000,000
Law Primary School Nursery Alterations 02/12/2025 £100,000
Physiotherapy Services for Employees 06/12/2025 £420,000
New Build Housing Developments at Main Street Blantyre & Raploch Street, Larkhall 06/12/2025 £7,000,000
Calderwood Ground Source Heat Pump Heat Network Project 20/12/2025 £12,000,000
Maintenance of Honeywell Gent Alarms 31/12/2025 £50,000
Roadtrace Application Software Licence 31/12/2025 £70,000
EV Charging Infrastructure Service Contract Renewal 31/12/2025 £100,000
Street Lighting Supplies 31/12/2025 £150,000
Arboriculture Works (Ash Dieback - Various Sites) 31/12/2025 £220,000
198

Page 199

Contract Description Expected Award
Date
Estimated Value
(£)
Supply of Homecare Uniforms - Tunics & Trousers 31/12/2025 £270,000
Blantyre/Hamilton Area Play Investment Upgrades 31/12/2025 £300,000
Landfilling of Residual Waste (unsuitable for processing via Thermal Treatment Facilities) 31/12/2025 £500,000
Provision of Managed Print Service 31/12/2025 £670,000
Framework for Mechanical and Electrical Vehicle Repairs 31/12/2025 £2,000,000
East Kilbride Centre West Demolition / Deconstruction 31/12/2025 £6,600,000
Cathcart Road Phase 2 Construction 01/01/2026 £1,900,000
Mobile Welding 12/01/2026 £600,000
Structural Testing and Visual Inspection of Lighting Columns 15/01/2026 £400,000
Payment Acceptance 31/01/2026 £557,500
The Supply and Fitting of Tyres for Vehicles and Plant 31/01/2026 £2,200,000
199

Page 200

Contract Description Expected Award
Date
Estimated Value
(£)
Crosshall Construction St Leonards East Kilbride 31/01/2026 £5,000,000
Blue Badge Digital Service Blue Badge Printing and Fulfilment Services 04/02/2026 £75,000
Hire of Vehicles and Plant 20/02/2026 £3,600,000
Sheriff Officer Services 28/02/2026 £200,000
Supply, Installation and Maintenance of a Corporate Telematics Solution 28/02/2026 £1,000,000
Supply and Delivery of Milk 28/02/2026 £1,950,000
Supply and Delivery of Ratchets and Straps 13/03/2026 £50,000
Secure Site Containers and Welfare Units 18/03/2026 £250,000
Video Conferencing Solution for schools 20/03/2026 £153,600
SLLC Audit Services 21/03/2026 £73,500
Foundation Apprenticeship in Automotive 31/03/2026 £50,000
200

Page 201

Contract Description Expected Award
Date
Estimated Value
(£)
Service and Maintenance of UPS Systems: various properties 31/03/2026 £50,000
Carluke Skate Park Refurbishment Works 31/03/2026 £50,000
Blacksmiths Materials 31/03/2026 £50,000
Provision of an ICT Research and Advisory Service 31/03/2026 £50,000
Maintenance and Servicing of Weighbridges 31/03/2026 £50,000
Specialist water treatment contract at Headquarters 31/03/2026 £50,000
Legal Online Research Package - Annual Subscription 31/03/2026 £64,103
Provision of Solar Powered CCTV (Fly Tipping) 31/03/2026 £70,000
Signage for Local Nature Reserves 31/03/2026 £70,000
Parent and Child Counselling 31/03/2026 £75,000
Disabled Ramps 31/03/2026 £78,000
201

Page 202

Contract Description Expected Award
Date
Estimated Value
(£)
Water Quality Sampling and Risk Assesments (Including Legionella) 31/03/2026 £100,000
Day time transport for school pupils - Taxis and Buses 31/03/2026 £100,000
Supply and Delivery of UPVC Materials 31/03/2026 £100,000
Project Management Team Hamilton Town Centre 31/03/2026 £100,000
Mental health and wellbeing Children and Young People 31/03/2026 £100,000
Street Lighting Materials- Aluminium Colums 31/03/2026 £100,000
The provision of Council wide PAT Testing at Council Properties 31/03/2026 £100,000
Tree Surgeon Works for Trees affected by Ash Back Disease 31/03/2026 £100,000
Ventiliation Works 31/03/2026 £100,000
Decoration Works 31/03/2026 £100,000
Interpretation Services including British Sign Language 31/03/2026 £100,000
202

Page 203

Contract Description Expected Award
Date
Estimated Value
(£)
Supply, Delivery and Installation of specialist Refrigeration Equipment 31/03/2026 £100,000
IT Service Management System 31/03/2026 £100,000
Dampness Works 31/03/2026 £103,000
Hamilton Masterplan – New Cross Demolition 31/03/2026 £125,000
Repair of Brick/Stone Cemetery Walls 31/03/2026 £150,000
Lone Working Solution 31/03/2026 £160,000
Payment Processing Software - Subscription Services 31/03/2026 £200,000
Play Equipment 31/03/2026 £200,000
Supply and Delivery of Trees, Plants, Shrubs and Associated Products 31/03/2026 £250,000
Heating Spares 31/03/2026 £400,000
Debt Management & Diligence Services 31/03/2026 £400,000
203

Page 204

Contract Description Expected Award
Date
Estimated Value
(£)
Roughcasting 31/03/2026 £400,000
Supply and Delivery of Plumbing Materials 31/03/2026 £500,000
Supply and Delivery of Trade Materials 31/03/2026 £600,000
Advocacy Services 31/03/2026 £700,000
Supply & Delivery of Library Books / Textbooks / Multimedia supplies 31/03/2026 £750,000
Provision, Support and Maintenance of eLearning and Development Platform 31/03/2026 £750,000
Supply & Installation of E Gates for SLLC 31/03/2026 £800,000
Supply and Delivery of Electrical Materials 31/03/2026 £1,000,000
Supply, Delivery and Installation of Non-Housing Flooring 31/03/2026 £1,000,000
Removal of Asbestos with Reinstatement Works and Remedials 31/03/2026 £1,000,000
Synthetic Football Pitch Upgrades - Hamilton Palace Sports Grounds 31/03/2026 £1,000,000
204

Page 205

Contract Description Expected Award
Date
Estimated Value
(£)
Telecare equipment - personal alarms (SW) 31/03/2026 £1,200,000
City Deal - M74 Junction Improvements 31/03/2026 £1,300,000
Rigside Primary School Fire Damage Reinstatement New Build 31/03/2026 £1,500,000
Plumbing Supplies 31/03/2026 £1,500,000
Secure Care Provision 31/03/2026 £3,500,000
Homelessness Provision all areas 31/03/2026 £5,000,000
Digital Connectivity Multi-Lot 31/03/2026 £18,000,000
City Deal - Stewartfield Way 31/03/2026 £25,000,000
Care at Home and Housing Support PSA: applicants to Procured Spend Arrangement during
2024/2025 and 2025/2026 31/03/2026 £714,300,000
New Build Housing - Sheildaig Drive, Rutherglen 31/03/2026 £4,500,000
New Build - Priory Avenue, Lesmahagow 31/03/2026 £5,400,000
205

Page 206

Contract Description Expected Award
Date
Estimated Value
(£)
GCR – Professional Services - Enabling Commercial Space 31/03/2026 £100,000
Langlands Site Improvement Works 31/03/2026 £250,000
Retread Contract 31/03/2026 £1,600,000
GCR – Enabling Commercial Space Works Contract 31/03/2026 £1,900,000
Rhinophalt Contract 31/03/2026 £100,000
Hamilton Masterplan – Procurement of Project Management Team 31/03/2026 £100,000
Clydesdale Way - paths and infrastructure (multiple works projects) 31/03/2026 £7,000,000
Educational Services PSA: applicants to Procured Spend Arrangement during 2025/2026 and
2026/2027 31/03/2026 £42,141,617
Passenger Transport Services DPS: Applications during 2025/2026 and 2026/2027 31/03/2026 £100,000,000
Early Learning and Childcare PSA: applicants to Procured Spend Arrangement during 2025/2026
and 2026/2027 31/03/2026 £143,500,000
Adult Supported Living:  applicants to Procured Spend Arrangement during 2025/2026 and
2026/2027 31/03/2026 £229,000,000
206

Page 207

Contract Description Expected Award
Date
Estimated Value
(£)
Preparation of Management Plans for 7 of South Lanarkshire's Local Nature Reserves - Prepara-
tion and Associated Work 01/04/2026 £56,000
Supply and Delivery of 2 Wheeled Bins 01/04/2026 £2,500,000
Supply and Delivery of Personal Protective Equipment (PPE) 10/04/2026 £2,700,000
Traffic Order Management system 30/04/2026 £50,000
Clyde Walkway Repairs - Works 30/04/2026 £540,000
Supply and Delivery of Lubricant Oils, Greases and Anti-Freeze 08/05/2026 £156,000
Calibration and Repair of Mechanical Testing Equipment 15/05/2026 £100,000
Delivery of Foundation Apprenticeships 28/05/2026 £235,000
SUPPLY AND DISTRIBUTION OF FROZEN FOODS UNDER SCOTLAND EXCEL FRAMEWORK
FROZEN FOODS 11-20 29/05/2026 £4,859,078
Arboriculture Works Framework (Ash Dieback/Emergency works) 30/05/2026 £500,000
Technical Managed Service 31/05/2026 £175,000
207

Page 208

Contract Description Expected Award
Date
Estimated Value
(£)
Adult and Young Peoples Carer Service 31/05/2026 £4,500,000
Employability Services PSA - all service users 31/05/2026 £10,000,000
Void Property Protection 05/06/2026 £400,000
Supply and Delivery of Miscellaneous Roads Products 12/06/2026 £120,000
Non-Housing Planned Decorating Maintenance and Repairs 22/06/2026 £50,000
Supply and Delivery of Ultracrete 26/06/2026 £230,000
Installation of Door and Door Entry Systems 26/06/2026 £358,559
Chimney Works 30/06/2026 £100,000
Provision of ICT Managed Security 30/06/2026 £300,000
Scientific Testing Services (including chemical analytical, bacteriological examination) 30/06/2026 £350,000
Adult and Young Peoples Carer Service - Adults & Young People 30/06/2026 £4,500,000
208

Page 209

Contract Description Expected Award
Date
Estimated Value
(£)
Design, Supply, and Installation of Fire Doors - Towers 23/07/2026 £8,406,000
Supply and Delivery of Drainage Products 31/07/2026 £560,000
Provision and Maintenance of Watercourse Remote Monitoring Equipment 18/08/2026 £50,000
Maintenance of Lifts 29/08/2026 £1,947,002
Replacement for CRM System 31/08/2026 £65,713
The Provision of Vehicle Breakdown Recovery Services 31/08/2026 £325,000
Tenants Contents Insurance 30/09/2026 £400,000
Double Glazed Units 30/09/2026 £500,000
Printing and Issue of Postal Votes, Printing of Ballot Papers and Postal Vote Management System
(PVMS) 30/09/2026 £880,000
Christie Place Fabric including RAAC Removal 30/09/2026 £2,400,000
Employee Travel Services 31/10/2026 £60,000
209

Page 210

Contract Description Expected Award
Date
Estimated Value
(£)
Independent Adult Advocacy Services 31/10/2026 £2,282,274
Supply and Delivery of Small Tools 30/11/2026 £80,610
Primary School Counselling 30/11/2026 £120,000
Uplift, Storage and Disposal of Abandoned Vehicles 13/12/2026 £50,000
Provision of Secure Cash Collection Services 31/12/2026 £300,000
Fostering and Continuing Care 31/12/2026 £9,700,000
Anti-Skid Road Surfacing and Reflective Studs Contract 20/01/2027 £2,250,000
Supply and Delivery of Kerbs and Associated Products 02/03/2027 £240,000
Supply of Coffee and Associated Products 23/03/2027 £65,000
Supply and Delivery of Permanent Road Signage & Associated Products 27/03/2027 £162,000
Automated External Defibrillators 31/03/2027 £50,000
210

Page 211

Contract Description Expected Award
Date
Estimated Value
(£)
SLC Website, Intranet and Galaxy 31/03/2027 £50,000
The Repair and Maintenance of VAS Signs 31/03/2027 £50,000
Window Cleaning - Various Locations 31/03/2027 £200,000
Grounds Machinery Parts and Associated Products 31/03/2027 £200,000
First Aid Materials 31/03/2027 £227,000
Direct Award for the Supply and Distribution of Fresh Meats, Cooked Meats and Fresh Fish 31/03/2027 £2,000,000
Various works associated with Country Park Masterplanning 31/03/2027 £20,000,000
The Supply & Delivery of Liquid Fuels 01/04/2027 £6,000,000
Receipt and Processing of Organic Waste 01/04/2027 £8,200,000
Supply and Delivery of Audio-Visual Equipment 02/04/2027 £345,000
Supply and Delivery of Cold Permanent Pothole Repair 28/04/2027 £125,000
211

Page 212

Contract Description Expected Award
Date
Estimated Value
(£)
Service, Maintenance and Repair of Closed Protocol Fire and Intruder Alarms 01/05/2027 £300,000
Road Materials Testing Contract 12/05/2027 £430,000
Supply and Delivery of Commercial Catering Equipment 01/06/2027 £1,500,000
Supply and Delivery of Ad Blue Fuel Additive 08/06/2027 £160,000
Framework for the Provision of Vehicle Body Repairs 18/06/2027 £980,000
Maintenance of Lighting Columns (Sports Pitches Floodlighting) 26/06/2027 £640,000
Provision of Volume Mailing and Associated Services (for outbound mail and digital communica-
tions) 30/06/2027 £3,700,000
Supply, Implementation and Support of an EDRMS Corporate Solution 31/07/2027 £750,000 
212

Page 213

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources' Risk Register and
Risk Control Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-[purpose] 
 present an update on the Risk Register and Risk Control actions for Finance and
Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the content of the Resource Risk Register following review, attached at
Appendix 1, be noted; 
(2) that it be noted that the outstanding Risk Control actions will be progressed by
relevant officers.
[1recs]
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision-making processes.  The strategy requires Resources
to record and review risks and control actions regularly.  Finance and Corporate
Resources follow the guidance in developing, monitoring, and updating the Risk
Register on an ongoing basis. 
3.2. The Council’s updated Risk Management Strategy was rolled out via a Management
Bulletin with an effective date of 1 April 2025. 
3.3. The purpose of the risk register is to ensure that the Resource is fully aware of its top
risks; that these risks are prioritised; and that controls are in place to eliminate or
minimise the impact of the risks. 
3.4. The Resource scores the risks in accordance with the Council scoring mechanism,
based on likelihood and impact.  This results in risks being scored between 1 and 25
(low – very high). 
3.5. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls). 
3.6. The last update of the Finance and Corporate Resources Risk Register was reported
to the Committee on 30 October 2024.  
19
213

Page 214

3.7. The Resource’s top Risk Register and Risk Control Plan has been reviewed.  This
work was completed in September 2025. 
3.8. The Central Risk Management team annually review Resource compliance with the
Risk Management Strategy.  The outcome of the 2024/2025 review identified that
Finance and Corporate Resources achieved 100 per cent compliance, scoring 45 out
of a possible 45. 
4. Resource Risk Management
4.1. Each Resource has a Resource Risk Management Group which has responsibility
for the promotion and management of risk. 
4.2. The Finance and Corporate Resources Risk Management Group continues to
consult on a regular basis. 
4.3. The work of the group over the last year has focused on the review and update of
the Resource Risk Register and ensuring that the register reflected the Council Plan
and individual Service Plans. 
5. Risk Register
5.1. Work has been completed by the Resource Risk Group to finalise the review of the
Resource Risk Register.  The update considered risks at a Service level, as well as
strategic council risks. 
5.2. The Resource Risk Register will be monitored on an ongoing basis to allow new
risks to be added and for the control measures and scores of the existing risks to be
reviewed considering new information. 
5.3. Risks can result from internal or external influences, with examples being the impact
of projected funding cuts, legislative changes, or the impact of internal service
changes. 
5.4. The development process for the Resource Plan requires a risk assessment process
to be undertaken as appropriate resulting in some actions within the Resource Plan
having a corresponding risk identified within the risk register. 
5.5. The main changes to the register are summarised below:- 
 Risks removed 
“The Council is materially affected by the implications arising from the National
Care Service (NCS) Bill” 
On 23 January the Government published amendments which delete the entirety
of Part 1 of the National Care Service (Scotland) Bill.  This means that all the
structural reforms in the original NCS bill (and the government’s proposed draft
Stage 2 amendments) have been dropped.  This is therefore no longer
considered a Council Top risk.  
214

Page 215

“The Council inherits commercially unviable shopping centres due to the financial
failure of existing owner/management companies resulting in significant financial
and operational liabilities transferring to the Council.” 
This risk has been removed following the recent sale of the Regent Shopping
Centre in Hamilton and agreement to demolish Centre West in East Kilbride. 
There are no other shopping centres where ownership may transfer back to the
Council due to Council ownership of land.
 Risks consolidated
Table 1 details risks that have been consolidated this year, given they are closely
related.  The new risk wording is intended to cover all types of civil emergency
rather than a specific pandemic/endemic event. 
Table 1 – Consolidated Risks
2024 Risks 2025 Risk
 Failure to fulfil emergency
response commitments befitting
the Council’s status as a
Category One (emergency)
responder
 The Council does not have the
appropriate emergency /
business continuity plans;
contingency arrangements or
partnerships in place to respond
to/or recover from a
pandemic/endemic event
 The Council does not have the
appropriate resilience
measures, emergency or
business continuity plans in
place to respond efficiently as
a Category 1 Responder to a
civil emergency. 
 Changes to residual risk scores
Table 2 provides a summary of changes to risk scores. 
Table 2 – Amendments to Risk Scores
Risk Residual
Risk
Score
2024
Residual
Risk
Score
2025
Change
in
residual
score
Reason/comments
The Council fails to
comply with or meet
the expected
standards of scrutiny
and deliver the
improvement actions
identified by
regulatory bodies
20 16  As a result of the
Council receiving
positive inspection
reports the residual
risk score has been
reduced
Information
governance not
subject to adequate
control
12 16  Information
governance has
been added as a
new area in the
annual governance
statement for
2024/25 due to an
awareness of the
impact of security
215

Page 216

Risk Residual
Risk
Score
2024
Residual
Risk
Score
2025
Change
in
residual
score
Reason/comments
information
incidents. 
The perception of
this risk is increased
with the introduction
of new IT systems
planned for
2025/26.
Inability to ensure
public protection and
safety
16 12  The overall risk
score has
reduced given
that the Council
is compliant with
legislation and
has sound
governance
processes in
place. 
Following the
move from
analogue to
digital telephone
networks, there
has been periods
of disruption
experienced with
the community
alarm system. 
There are well
established
business
continuity plans
in place to
mitigate against
such risks, with a
focus on
communication
with service
users and next of
kin.
The provision of
Council services is
disrupted because of
industrial action
16 12  The residual risk
has been reduced
due to the recent
agreement of a two
year pay deal for all
staff members, with
exception to
teaching staff.
216

Page 217

Risk Residual
Risk
Score
2024
Residual
Risk
Score
2025
Change
in
residual
score
Reason/comments
Failure to provide an
effective legal service
6 12  This risk has
increased due to a
lack of capacity and
qualified officers to
meet service
demands 
5.6. As part of the review of the Risk Management Strategy, risk categories were
realigned, and some scores have been revised as part of the review of the risk
register.  This has resulted in a number of previously high/very high categorised risks
now being categorised as medium level risks, and therefore no longer feature as part
of the Resource’s top risks. 
5.7. Risks scored 20 to 25 are considered to be very high risks and risks scored 10 to 16
are considered to be high risks.  Very high and high risks are monitored closely.  The
top risks identified for the Resource, that is those that are residually scored as being
very high and high, are attached at Appendix 1. 
5.8. Appendix 2 provides a comparison of risk scores for 2024 and 2025.  This appendix
also details changes in risk descriptions. 
5.9. Risks evaluated residually as being medium or low risk will be monitored to ensure
that they continue to be adequately managed. 
6. Insurance hotspots and claim mitigation
6.1. An analysis of all claims has been undertaken by the Risk Management team.  This
highlights the main cause of claims and areas of concern within each Resource. 
Resources have been asked to feedback on controls that are currently in place and
any further planned actions to mitigate against any hotspot areas identified.  No
areas of concern were identified for Finance and Corporate Resources. 
7. Horizon scanning
7.1.   Through wider analysis and discussion, areas that could pose potential threats and
risks are emerging issues and opportunities that could affect the Resource were
identified.  Areas identified are listed below:- 
 Transformational Change 
The Council has embarked upon a transformational change programme which
includes a series of cross-cutting reviews, with a view to transforming services and
meeting savings targets over the next three years.  The level of change will require
the Council to take on new levels of risk in managing and delivering service change. 
Progress with the transformational reviews is being monitored and as part of review
the top risks for 2026/2027, updates will be sought from review leads to assess
progress and consider the need for a standalone risk. 
217

Page 218

 The Terrorism (Protection of Premises) Act 
The Act, more commonly known as Martyn’s Law, received Royal Assent on 3 April
2025.  The Security Industry Authority (SIA) has been named as the national
regulator, and it estimates that establishing the new regulatory capability will take
at least 24 months during which time they will work with the Home Office to engage
and inform stakeholders as preparation work progresses. 
The Act will require certain public premises and events to be prepared to keep
people safe in the event of an attack. 
Premises within scope of the legislation will include locations used for
entertainment and leisure, retail, food and drink, museums and galleries, sports
grounds (with controlled entry), the public areas of buildings, visitor attractions and
temporary event spaces where entry to a defined space is ticketed (with or without
a fee), as well as places of worship, health, and education settings. 
Existing Council-wide activities related to health and safety, risk management,
property maintenance, resilience and security generally all contribute to creating
safe environments for our staff, service users, visitors, and pupils.  Martyn’s Law
will add a new reference point for these activities.   
The Resilience Adviser, on behalf of the Executive Director (Housing and Technical
Resources), will convene a working group comprising representation from Risk
Management, Personnel, Licensing, Property Services, Facilities, Health and
Safety, Education, South Lanarkshire Leisure and Culture, HSCP and Police
Counter Terrorism Liaison Officers to:- 
 Raise awareness of Martyn’s Law within this group
 Identify premises anticipated to fall within the respective tiers
 Identify key issues and make recommendations on changes to policy and/or
procedure for managing the implementation of Martyn’s Law and ongoing
compliance 
 The Care Reform (Scotland) Bill 
The Care Reform (Scotland) Bill was passed on 10 June 2025 and will introduce
changes to social care procurement and a new right to breaks for unpaid carers. 
The legal right to breaks for unpaid carers means that Councils will have a duty to
decide whether a carer is able to take sufficient breaks from their caring role.  If
they are not, then the local authority will provide support to enable this, such as
providing funding for short respite breaks. 
This policy, given Scotland has around 700,000 unpaid carers, will cost between
£196 million and £315 million by 2035/2036, according to the Bill's financial
memorandum. 
Scotland’s Census 2022 estimated that there are 42,375 carers in South
Lanarkshire, equating to approximately 13% of its population.  This is likely to
have significant financial implications for the Council.  A watching brief will be
maintained, as “sufficient” has not yet been defined. 
218

Page 219

 Scotland Excel Supply Chain Intelligence Report 
The Scotland Excel Supply Chain Intelligence 2025 report highlights a significant
number of national and global issues that present supply chain challenges. 
The main areas covered in the 2025 Intelligence Report are:- 
 The Economic Outlook
 Inflation and price fluctuations
 Interest rates
 Global Market Security
 International trade tariffs
 US-UK Economic Prosperity Deal
 The Labour Market
 National Insurance Contributions
 Changes for international workers in care
 Policy and Funding
 Local Government Funding Landscape
 Proposed policy and legislation changes (Housing, Social Care)
 Environmental Change
 Avian bird flu
 Climate change adaptation
 Technological Change
 Artificial intelligence in supply chains 
This report has been circulated throughout the Council and Resources are being
encouraged to prepare and where possible put plans in place to react to the
challenges that arise. 
7.2. These areas will continue to be monitored to ensure that the Resource is adequately
prepared to respond where required. 
8. Scope and appetite for risk
8.1. The Resource aims to be risk embracing, that is it will accept a tolerable level of risk
in seeking service efficiencies and in agreeing control measures. 
8.2. The level of risk facing the Resource is measured both before (inherent risk) and
after (residual risk) consideration of controls.  The Resource should never carry a
very high residual risk exposure as this would indicate instability, but a low residual
risk exposure should also be avoided as this indicates lack of innovation. 
8.3. The Council’s universal risk tolerance levels were updated as part of the review of
the Risk Management Strategy last year, with the ideal risk profile now defined as:- 
 no more than 20 per cent of risks at a very high level
 no more than 25 per cent of risks at a high level
 around 40 to 50 per cent of risks at a medium level
 no more than 25 per cent of risks at a low level 
8.4. Table 3 below shows the Finance and Corporate Resources risk heat map, i.e. it
details the total number of risks for each individual risk score.  Table 4 below notes
the overall risk profile for the Finance and Corporate Resources risks.  
219

Page 220

Table 3 – Top risks heat map 
Likelihood
5
Almost
certain   
2 
4
Likely   3 2 1
3
Possible  2 11 5 
2
Unlikely 1 12 15 5 
1
Rare 3 7 7    
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table 4 – Top risks risk profile
Risk
category
Risk rating Number
of risks
Percentage
of risks
1 Very high (20-25) 3 3.9%
2 High (10-16) 10 13.2%
3 Medium (5-9) 33 43.4%
4 Low (1-4) 30 39.5%  
76 100.0% 
8.5. The main changes to the Resource risk profile, as a result of the realignment of risk
categories, and changes to risk scores noted in Section 5.5, are:- 
 Number of very high risks has reduced from 8 to 3
 Number of high risks has reduced from 31 to 10
 33 risks are now recorded as being medium risks; with a further 30 recorded
as low risks. 
8.6. The risk profile detailed in Table 4 is now largely in line with the ideal universal risk
exposure defined by the Risk Management Strategy, as there has been a reduction
in the number of very high and high risks.  This is in part due to the revision to risk
bandings and tolerance levels within the strategy. 
9. Risk Control Actions
9.1. 71.4 per cent (10/14) of control actions due for completion during 2024/2025 were
completed on time against an overall Resource target of 90 per cent. 
9.2. The actions that are on hold or where slippage has occurred relate to Community
Planning and IT forecasting.  These actions have been carried forward to the
2025/2026 risk control plan. 
9.3. Details of the completion of risk control actions during 2024/2025 and 2025/2026 to
date are contained in Table 5 below. 
220

Page 221

Table 5 – Completion of risk control actions 
2024/2025
2025/26
(as at 30
September
2025)
Completed on time 10 0
Slippage/On Hold 4
(c/f to 25/26) 1
To be completed at a later date 0 4
Total number of actions due 14 5 
9.4. Progress with completion of Resource Risk Control Actions is monitored by the
Central Risk Management team.  This is also reviewed by the Resource Risk Group. 
9.5. There are currently 5 risk control actions due for completion during the remainder of
2025/2026.  The Committee is asked to note that the outstanding actions to mitigate
risks within the Risk Control Plan will be progressed by the relevant officers. 
10. Three lines model 
10.1. The ‘three lines’ model was developed by the Institute of Internal Auditors.  When
using this model, risk controls are categorised under three lines of defence.  This
aims to provide assurance around the adequacy of control measures that are in
place to mitigate strategic risks, identify control descriptions that need amendment to
clearly link these to the mitigation of the risk and to highlight any residual gaps in
controls that require to be addressed. 
10.2. Internal Audit work on the three lines model for the top risks has been concluded,
with Resources provided with individual analysis and guidance to support them in
developing further controls to close any gaps identified from the three lines approach
for the Council top risks that they lead on.  Work is now ongoing to review and refine
risk controls.  This is scheduled to be completed by 31 March 2026. 
11. Major projects, partnerships or change
11.1. Within Finance and Corporate Resources 2 partnerships have been identified.  1 of
these is considered to be high risk, the Community Planning Partnership.  The
remaining partnership (Clyde Valley Learning and Development Project) has been
assessed as being low risk. 
11.2. Appropriate risk management arrangements are in place for the CPP with regular
reviews and reports on their risk register and action plan presented to the CPP
Board. 
12. Next steps
12.1. The Resource Risk Management Group will continue to consult on a regular basis. 
The risk register will be reviewed on an ongoing basis by the group to ensure that
risks remain valid for the appropriate Service areas and to identify new areas of risk
that affect the Resource.  An update report will be provided to the Committee on an
annual basis. 
13. Employee Implications
13.1. Time will be required by the Resource Risk Management Group in the management
of the Resource Risk Register and Risk Control Plan. 
221

Page 222

14. Financial Implications
14.1. There are no direct financial implications associated with the Resource’s top risks. 
There are a number of proposed risks which are classified under the heading of
financial.  Where this is the case, the appropriate controls and actions have been
included in the risk control cards and progress will be monitored. 
15.  Climate Change, Sustainability and Environmental Implications 
15.1. Sustainable development issues are included within the Council’s top risk register
through being linked directly to the Council plan objective ‘make communities safer,
stronger and sustainable’ 
16. Other Implications
16.1. Failure to demonstrate that risk is actively considered and managed cannot only lead
to avoidable financial loss but could also affect delivery of services and could affect
the Resources’ reputation. 
17. Integrated Impact Assessment and Consultation Requirements
17.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore, no impact assessment
is required. 
17.2. Consultation on the content of this report has been undertaken with the Resource
Management Team. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective and efficient 
Previous References
 Report to Finance and Corporate Resources Committee – 30 October 2024 – Update of
Finance and Corporate Resources Risk Register and Risk Control Plan 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
222

Page 223

Appendix 1
Finance and Corporate Resources Risk Register (as at September 2025)
Extract of risks with residual score category of Very High and High
Risk
Category
Key risk Inherent
Risk
Score
Sample of Controls Residual
Risk
Score
1
Very High
(20-25) 
The Budget Gap that the council faces across the
medium term continues to be the biggest risk
faced by the Council.  The Budget Gap is the
result of the cumulative real terms reductions in
Government funding as well as the ongoing
impact of increased demand, increased cost of
services due to inflation, and increased staff
costs resulting from pay awards.  The potential of
reduced fees/income being received by the
Council would further add to budget pressures
across Services
Council Top Risk
25 • An embedded and systematic approach to
savings identification
• Robust processes in place to report annual
budget and Council Tax proposals to Elected
Members
• Council’s approved long term financial strategy
20
Failure to prevent or mitigate against fraud, theft,
organised crime and cyber attacks which impact
upon the council’s operations 
Council Top Risk
25 • Anti-Fraud and Corruption Strategy
• Whistle-blowing procedures
• Cyber security and information security training
• Dissemination of fraud alerts
20
The council, in conjunction with its partners, is
unable to provide the required support to reduce
the overall impact of the cost-of-living crisis on
households in South Lanarkshire, resulting in
increasing levels of poverty, debt, and poorer
outcomes for people 
Council Top Risk
25 • Debt and money advice from the Money
Matters Advice Service
• Provision of crisis and community care grants
from the Scottish Welfare Fund
20
223

Page 224

2
High
(10-16)
Information governance not subject to adequate
control 
Council Top Risk
20 • Awareness raising
• Information Governance Group in place
• Information Governance Strategy
16
The council fails to comply with or meet the
expected standards of scrutiny and deliver the
improvement actions identified by regulatory
bodies
Council Top Risk
25 • Regular communication with regulatory bodies
• Improvement plans developed and progressed
16
Inability to ensure public protection and safety
Council Top Risk
25 • Resilience response plans to respond to
disruption to community alarm service
12
The council does not have the appropriate
resilience measures, emergency or business
continuity plans in place to respond efficiently as
a Category 1 Responder to a civil emergency
Council Top Risk
25 • Media response policy
• IT business continuity plans
• Emergency Management Team
12
Procurement activity is affected by supply chain
issues; a lack of resources; non-compliance or
legal challenge 
Council Top Risk
25 • Procurement Strategy and action plan
• Contracts register in place
• Procurement Network Group
12
The provision of council services is disrupted
because of industrial action
Council Top Risk
20 • Two-year deal agreed provides degree of
certainty around service provision (except for
Education)
• Strong local Trade Union relations to manage
any issues arising
12
Lack of capacity and skills to meet increased
service demands 
Council Top Risk
20 • Workforce Strategy
• Performance Appraisal Process
• Learning and Development Strategy
12
224

Page 225

Historic childhood abuse  
Council Top Risk
16 • Regular actuarial reviews of post insurance
fund exposures undertaken to establish
potential liability for the council
12
Gap in data analytical skills within Internal Audit
impacting on development of the function or
failure to maximise new AI opportunities.
16 • Formal strategy being developed (including a
training plan)     
• Time within the Internal Audit Plan to develop
data analytical skills 
• Attendance at cross-Local Authority Data
Analytical groups                                                                                   
12
Failure to provide an effective legal service 16 • Outsourcing via Approved Providers list
including new Legal Services Framework
• Succession planning and staff development to
develop skills in areas where there are gaps in
knowledge or resources
12
225

Page 226

Appendix 2: Comparison between 2025 and 2024 Finance and Corporate Resources risk register 
Risk
Category
Key risk 2024
Residual
risk
score 
2025
Residual
risk
score
Change
in
residual
risk
scores
Other changes
1
Very High
(20-25) 
The Budget Gap that the council faces across the medium term
continues to be the biggest risk faced by the Council.  The Budget
Gap is the result of the cumulative real terms reductions in
Government funding as well as the ongoing impact of increased
demand, increased cost of services due to inflation, and increased
staff costs resulting from pay awards.  The potential of reduced
fees/income being received by the Council would further add to
budget pressures across Services
Council Top Risk
20 20 = Amended wording
Failure to prevent or mitigate against fraud, theft, organised crime
and cyber attacks which impact upon the council’s operations 
Council Top Risk
20 20 = 
The council, in conjunction with its partners, is unable to provide
the required support to reduce the overall impact of the cost-of-
living crisis on households in South Lanarkshire, resulting in
increasing levels of poverty, debt, and poorer outcomes for
people 
Council Top Risk
20 20 = 
2
High
(10-16)
Information governance not subject to adequate control 
Council Top Risk
12 16  
The council fails to comply with or meet the expected standards of
scrutiny and deliver the improvement actions identified by
regulatory bodies
Council Top Risk
20 16  
Inability to ensure public protection and safety
Council Top Risk
16 12  
226

Page 227

Risk
Category
Key risk 2024
Residual
risk
score 
2025
Residual
risk
score
Change
in
residual
risk
scores
Other changes
The council does not have the appropriate resilience measures,
emergency or business continuity plans in place to respond
efficiently as a Category 1 Responder to a civil emergency
Council Top Risk
12 12 = Consolidated: 
Failure to fulfil emergency
response commitments
befitting the council’s status
as a Category One
(emergency) responder 
And 
The council does not have
the appropriate emergency /
business continuity plans;
contingency arrangements or
partnerships in place to
respond to/or recover from a
pandemic/ endemic event.  
Procurement activity is affected by supply chain issues; a lack of
resources; non-compliance or legal challenge 
Council Top Risk
12 12 = 
The provision of council services is disrupted because of industrial
action
Council Top Risk
16 12  
Lack of capacity and skills to meet increased service demands 
Council Top Risk
12 12 = 
Historic childhood abuse  
Council Top Risk
12 12 = 
227

Page 228

Risk
Category
Key risk 2024
Residual
risk
score 
2025
Residual
risk
score
Change
in
residual
risk
scores
Other changes
Gap in data analytical skills within Internal Audit impacting on
development of the function or failure to maximise new AI
opportunities.
9 12  Amended wording to include
AI opportunities
Failure to provide an effective legal service 6 12  
228

Page 229

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 19 November 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Notification of Contracts Awarded: 1 April to 30
September 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee, in accordance with Standing Orders on
Contracts, of contracts awarded by Finance and Corporate Resources during the
period 1 April to 30 September 2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that details of the contracts awarded be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts
that details of the acceptance of all tenders above £50,000 be reported
retrospectively to the relevant Committee for noting, other than those under Clause
21.3 where the award is not the lowest in a price only tender, or costs exceed the
approved financial provision.  In these instances, a report is submitted to the
appropriate Committee and subsequent authority to award is granted by that
Committee. 
4. Contract Awards
4.1. The details of contracts awarded for the period 1 April to 30 September 2025, on the
basis of lowest offer and/or most economically advantageous offer submitted, is
provided at Appendix 1. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. Appropriate budget provision is in place for all contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information presented in this report.  
20
229

Page 230

8. Other Implications
8.1. There are no direct risks or implications for sustainability in terms of the information
contained in this report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
20 October 2025 
Link(s) to Council Values/Priorities/Outcomes
 Value:  Accountable, effective, efficient and transparent 
Previous Reference
 Finance and Corporate Resources Committee, 11 June 2025 
List of Background Papers
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.uk 
230

Page 231

Appendix 1
Contracts Awarded by Finance and Corporate Resources over £50,000 in value 
Contract
Reference
Number
Contract Description Contractor Name Estimated
Value Start Date End Date Extension
Date Award date
SLC/FC/24/046
Provision of Postal Services - Physical
and Hybrid Mail (for outbound mail
physical mail)
Royal Mail Group Ltd 1,000,000.00 31-Mar-2025 30-Mar-2027 30-Mar-2029 01-Apr-2025
SLC/FC/24/012
Provision of Civica Digital 360EDM and
Workflow Software (EDRMS for Benefits
and Revenue)
Civica UK Ltd 456,352.61 01-Apr-2025 31-Mar-2030 31-Mar-2031 01-Apr-2025
SLC/FC/24/001 End User Services Computacenter (UK) Ltd 3,673,009.23 01-Jul-2025 30-Jun-2030  05-Apr-2025
SLC/FC/24/099 Utilities – Supply of Gas for SLC and
SLLC - April 2025 onwards
TotalEnergies Gas & Power
Ltd 49,892,976.04 01-Apr-2025 31-Mar-2027 31-Mar-2028 08-Apr-2025
SLC/FC/25/031 Annual Renewal of CMER AutoDesk
AutoCAD Licences Computacenter (UK) Ltd 76,074.52 14-Apr-2025 13-Apr-2026 14-Apr-2027 10-Apr-2025
SLC/FC/24/003 ArcGIS Licences and Maintenance Esri (UK) Ltd 162,985.25 01-Apr-2025 31-Mar-2026 31-Mar-2027 11-Apr-2025
SLC/FC/24/024 Burial and Cremation Software System GSS (NI) Ltd T/A Plotbox 229,180.00 14-Apr-2025 13-Apr-2028 13-Apr-2029 12-Apr-2025
SLC/FC/23/087 Employee Salary Sacrifice, Additional
Voluntary Contributions
AVC Wise Ltd T/A My Money
Matters 201,118.48 01-Jun-2025 31-May-2029  14-Apr-2025
SLC/FC/24/059 Licensing Identification Products VIP System Ltd 159,274.07 01-May-2025 30-Apr-2028 30-Apr-2030 14-May-2025
SLC/FC/23/066 Digital Care Plan Computacenter (UK) Ltd 252,512.10 31-May-2025 30-May-2030  31-May-2025
SLC/FC/25/019 Provision of Employee Physiotherapy
Services Physicare 189,339.95 08-Jun-2025 07-Dec-2025 07-Jun-2026 02-Jun-2025
SLC/FC/24/004 Cashless Catering Solutions CRB Cunninghams 421,643.40 01-Jul-2025 30-Jun-2028 30-Jun-2030 10-Jun-2025
SLC/FC/23/054  Legal Services Providers
CMS Cameron McKenna
Nabarro Olswang, Harper
Macleod LLP, Morton Fraser
MacRoberts LLP, Clyde & Co
(Scotland) LLP, Anderson
Strathern Sols, Shepherd &
Wedderburn LLP, DWF LLP,
Brodies, Olswang LLP 
666,667.00 01-Apr-2024 20-Dec-2025 20-Dec-2026 15-Jun-2025
SLC/FC/25/030 Microsoft Office 365 Backup and
Recovery Solutions Softcat Plc 270,579.69 01-Aug-2025 31-Jul-2028  23-Jun-2025
SLC/FC/25/025 Building Standards Regulations (CIS)
Licenses Allium UK Holding Ltd 85,990.49 17-Apr-2025 16-Apr-2026 16-Apr-2027 30-Jun-2025
231

Page 232

Contract
Reference
Number
Contract Description Contractor Name Estimated
Value Start Date End Date Extension
Date Award date
SLC/FC/24/094
Provision, Support and Maintenance of
Tessello Software eLearning and
Development Platform
Capita Business Services Ltd 261,805.50 01-Aug-2025 31-Jul-2026 31-Jul-2027 29-Jul-2025
SLC/FC/25/036 Oracle Fusion Implementation Measure For Measure Limited 60,200.00 01-Jul-2025 31-Dec-2025 30-Jun-2026 07-Aug-2025
SLC/FC/25/011 Provision of Road Operative Modern
Apprenticeship Training R.C.R Safety & Training Ltd 88,870.52 23-Jun-2025 31-Oct-2028 31-Oct-2029 16-Aug-2025
SLC/FC/25/055 Oracle Fusion Workforce Scheduling
Implementation Mastek Systems Company Ltd 85,958.00 18-Aug-2025 31-Mar-2026  20-Aug-2025
SLC/FC/24/081 Electronic Payment Services Allpay.Net Ltd 386,080.00 01-Sep-2025 31-Aug-2027 31-Aug-2028 04-Sep-2025
SLC/FC/24/043
Supply, Delivery, Installation and
Maintenance of Multi-Functional Device
(MFD) Hardware incorporating
maintenance and Secure Print
Management Software
Canon UK Ltd 3,000,000.00 10-Sep-2025 09-Sep-2030  08-Sep-2025
SLC/FC/25/071 Web Security Gateway Licences Computacenter (UK) Ltd 112,255.00 02-Oct-2025 01-Oct-2026  26-Sep-2025  
232

Page 233

Contract Extensions for contracts over £50,000 in value 
Contract Reference
Number Contract Description Contractor Name Estimated
Value (£)
Extension
Value (£) Start Date End Date Extension
date
SLC/PS/FINCOR/18/183 Cloud Migration and Hosting
Services Datavita Ltd 10,232,942.54 3,000,000 01-Oct-2020 30-Sep-2027 14-Apr-2025
SLC//PS/FINCOR/23/013
Provision of Volume Mailing
and Associated Services (for
outbound mail and digital
communications)
Critiqom Ltd 3,643,014.00 2,013,502 01-Jun-2023 30-Jun-2027 27-Jun-2025
SLC/FC/23/128 Desktop Client Devices HP Inc UK Limited 700,000.00 175,000 01-Sep-2023 31-Aug-2026 27-Aug-2025
SLC/FC/24/015 Security for Council Offices Securigroup Services
Ltd 169,284.10 82,115 01-Apr-2025 31-Mar-2026 25-Sep-2025 
233

Page 234

234