Agenda Document Pack - Finance and Corporate Resources Committee - 10/09/2025
South Lanarkshire Council · 10 September 2025
Back to Finance and Corporate Resources Committee — 10 September 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Council Offices, Almada Street Hamilton, ML3 0AA Tuesday, 02 September 2025 Dear Councillor Finance and Corporate Resources Committee The Members listed below are requested to attend a meeting of the above Committee to be held as follows:- Date: Wednesday, 10 September 2025 Time: 14:00 Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton, ML3 0AA The business to be considered at the meeting is listed overleaf. Yours sincerely Paul Manning Chief Executive Members Lesley McDonald (Chair), Walter Brogan (Depute Chair), Celine Handibode (Depute Chair), Joe Fagan (ex officio), Alex Allison, Mathew Buchanan, Andy Carmichael, Maureen Chalmers, Margaret Cooper, Andrea Cowan, Maureen Devlin, Mary Donnelly, Grant Ferguson, Gladys Ferguson-Miller, Graeme Horne, Martin Hose, Ross Lambie, Katy Loudon, Hugh Macdonald, Catherine McClymont, Elaine McDougall, Mark McGeever, Mo Razzaq, John Ross, Graham Scott, Kirsty Williams Substitutes Archie Buchanan, Poppy Corbett, Colin Dewar, Ross Gowland, Gavin Keatt, Susan Kerr, Martin Lennon, Richard Lockhart, Richard Nelson, Carol Nugent, Norman Rae, Helen Toner, David Watson 1
Page 2
BUSINESS 1 Declaration of Interests 2 Minutes of Previous Meeting Minutes of the Finance and Corporate Resources Committee of 11 June 2025 submitted for approval as a correct record. (Copy attached) 5 - 12 Monitoring Item(s) 3 Finance and Corporate Resources - Revenue Budget Monitoring 2024/2025 Report dated 12 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 13 - 24 4 Finance and Corporate Resources - Revenue Budget Monitoring 2025/2026 Report dated 12 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 25 - 36 5 Finance and Corporate Resources Committee - Capital Budget Monitoring 2024/2025 Report dated 11 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 37 - 40 6 Finance and Corporate Resources - Capital Budget Monitoring 2025/2026 Report dated 11 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 41 - 44 7 Finance and Corporate Resources – Workforce Monitoring – 1 April to 30 June 2025 Report dated 4 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 45 - 52 8 Council-wide Workforce Monitoring – 1 April to 30 June 2025 Report dated 4 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 53 - 72 9 Treasury Management Activity – 2025/2026 First Quarter Review Report dated 13 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 73 - 80 Item(s) for Decision 10 Finance and Corporate Resources' Workforce Plan 2025 to 2027 Report dated 5 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 81 - 126 11 Learning and Development Strategy 2025 to 2027 Report dated 7 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 127 - 152 12 Prudential Indicators, Treasury Management Activity and Annual Investment Report 2024/2025 Report dated 20 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 153 - 174 2
Page 3
13 Revenue Collection and Approval for Write Offs Report dated 20 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 175 - 180 14 Short Term Lets Licence Fees for New Application Types Report dated 4 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 181 - 184 Item(s) for Noting 15 Reserves Strategy Report dated 14 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 185 - 190 16 Common Good Update Report Report dated 15 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 191 - 198 17 Council Tax Paperless Billing Report dated 7 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 199 - 202 18 Money Matters Advice Service Annual Report 2024/2025 Report dated 20 August 2025 by the Executive Director (Finance and Corporate Resources). (Copy attached) 203 - 238 Urgent Business 19 Urgent Business Any other items of business which the Chair decides are urgent. For further information, please contact:- Clerk Name: Carol Lyon Clerk Telephone: 07385370065 Clerk Email: carol.lyon@southlanarkshire.gov.uk 3
Page 4
4
Page 5
FINANCE AND CORPORATE RESOURCES COMMITTEE Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street, Hamilton on 11 June 2025 Chair: Councillor Lesley McDonald Councillors Present: Councillor Alex Allison, Councillor Walter Brogan (Depute), Councillor Mathew Buchanan, Councillor Andy Carmichael, Councillor Maureen Chalmers, Councillor Andrea Cowan, Councillor Maureen Devlin, Councillor Colin Dewar (substitute for Councillor Gladys Ferguson-Miller), Councillor Grant Ferguson, Councillor Celine Handibode (Depute), Councillor Graeme Horne, Councillor Martin Hose, Councillor Ross Lambie, Councillor Hugh Macdonald, Councillor Catherine McClymont, Councillor Elaine McDougall, Councillor John Ross, Councillor Graham Scott, Councillor Helen Toner (substitute for Councillor Mary Donnelly), Councillor Kirsty Williams Councillors’ Apologies: Councillor Margaret Cooper, Councillor Mary Donnelly, Councillor Joe Fagan (ex officio), Councillor Gladys Ferguson-Miller, Councillor Katy Loudon, Councillor Mark McGeever, Councillor Mo Razzaq Chief Executive’s Service T Little, Head of Communications and Strategy Finance and Corporate Resources J Taylor, Executive Director; C Fergusson, Head of Finance (Transactions); M Husband, Head of IT Services; S Jessup, Administration Assistant; C Lyon, Administration Officer; M Milne, Head of Personnel Services; L O’Hagan, Head of Finance (Strategy); I Strachan, Head of Administration and Legal Services 1 Declaration of Interests No interests were declared. 2 Minutes of Previous Meeting The minutes of the meeting of the Finance and Corporate Resources Committee held on 26 March 2025 were submitted for approval as a correct record. The Committee decided: that the minutes be approved as a correct record. 3 Minutes of Appeals Panel The minutes of the meeting of the Appeals Panel held on 27 February 2025 were submitted for approval as a correct record. The Committee decided: that the minutes be approved as a correct record. Councillor Dewar joined the meeting during consideration of the above item of business 4 Minutes of the Recruitment Committee The minutes of the meeting of the Recruitment Committee held on 23 April 2025 were submitted for approval as a correct record. 2 5
Page 6
The Committee decided: that the minutes be approved as a correct record. 5 Finance and Corporate Resources - Workforce Monitoring – February and March 2025 A report dated 6 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on the following employee information for Finance and Corporate Resources for the period 1 February to 31 March 2025:- attendance statistics occupational health statistics accident/incident statistics disciplinary hearings, grievances and Dignity at Work cases analysis of leavers and exit interviews staffing watch as at 8 March 2025 The Committee decided: that the report be noted. [Reference: Minutes of 26 March 2025 (Paragraph 6)] 6 Council-wide Workforce Monitoring – February and March 2025 A report dated 6 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on the following Council-wide employee information for the period 1 February 2 to 31 March 2025:- attendance statistics occupational health statistics accident/incident statistics disciplinary hearings, grievances and Dignity at Work cases analysis of leavers and exit interviews recruitment monitoring staffing watch as at 8 March 2025 The Committee decided: that the report be noted. [Reference: Minutes of 26 March 2025 (Paragraph 7)] 7 Finance and Corporate Resource Plan – Quarter 4 Progress Report 2024/2025 A report dated 13 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on the Finance and Corporate Resource Plan Quarter 4 Progress Report for 2024/2025 for the period 1 April 2024 to 31 March 2025. The Resource Plan measures were rated using a traffic light system of red, amber or green as well as blue (BRAG) which indicated that an action had been completed. Details were provided on:- progress made in implementing the priority projects identified in the Resource Plan 2024/2025, as detailed in the Quarter 4 Progress Report, attached as Appendix 2 to the report 6
Page 7
key achievements made by the Resource to date, as detailed in Section 5.3 of the report measures which had changed from Quarter 2 to Quarter 4, as detailed in Appendix 3 to the report The Committee decided: (1) that the Finance and Corporate Resource Plan Quarter 4 Progress Report 2024/2025, as summarised in paragraph 5.2. and attached as Appendix 2 of the report, be noted; (2) that the key achievements made by the Resource for the year, as detailed in paragraph 5.3. of the report, be noted; (3) that the area for improvement, as detailed in paragraph 5.4. of the report, be noted; and (4) that the additional scrutiny of changes in measure status between Quarter 2 and Quarter 4, as summarised at paragraph 5.5. and detailed at Appendix 3 of the report, be noted. [Reference: Minutes of 21 August 2024 (Paragraph 12)] 8 Finance and Corporate Resource Plan 2025/2026 A report dated 13 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on the Finance and Corporate Resource Plan 2025/2026. Details were provided on the Resource Plan for 2025/2026, attached as Appendix 1 to the report, which outlined:- key areas of focus for the year ahead resource outcomes measures and actions resourcing of the Plan Following approval at individual Resource Committees, the Resource Plans for 2025/2026 would be submitted, as a pack, to the meeting of the Executive Committee to be held on 25 June 2025 for noting. The Resource had established a number of outcomes to support the delivery of the Council Plan, Connect, in 2025/2026. To support those outcomes, the Resource had developed performance measures in an action plan, detailed in Section 4 of the Resource Plan. Key or strategic measures would be included in the Council Plan progress reports 2025/2026, with the remaining measures being monitored and reported at Resource level. In line with the Council’s performance management arrangements, a mid-year progress report on actions identified in the 2025/2026 Resource Plan and an end of year progress report respectively, would be submitted to future meetings of the Committee. Once approved, the Resource Plan would be made available on the Council’s website. The Committee decided: [ (1) that the Finance and Corporate Resource Plan 2025/2026, attached as Appendix 1 to the report, be approved; (2) that the Resource Plan 2025/2026 be uploaded to the Council’s website; 7
Page 8
(3) that it be noted that, following Committee approval, all Resource Plans would be submitted to the Executive Committee on 25 June 2025 for noting; and (4) that it be noted that Progress Reports on the Resource Plan 2025/2026 would be submitted, at Quarter 2 and Quarter 4, to future meetings of this Committee. 9 Revenue Collection and Approval for Write-Offs A report dated 21 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on:- collection performance for the financial year 2024/2025 to 31 March 2025 on revenue income which comprised Council Tax, non-domestic rates (NDR), sundry debts and arrears performance in the Non Domestic Rates Incentivisation Scheme (NDRIS) the write-off of irrecoverable Council Tax, non-domestic rates, Business Improvement District (BID) levy, sundry debt and Housing Rent and associated charges Details were provided on current collection targets. The Council was ahead of target but behind comparable performance from 2023/2024 in respect of Council Tax. In respect of non-domestic rates and sundry debt, the Council was ahead of both target and comparable performance from 2023/2024. In terms of arrears collection targets, the Council was ahead of both target and comparable performance from 2023/2024 in respect of Council Tax and non-domestic rates. In respect of sundry debt, the Council was behind both target and comparable performance from 2023/2024. The Non Domestic Rates Incentivisation Scheme (NDRIS), formerly known as the Business Rates Incentivisation Scheme (BRIS), was a Scottish Government initiative to incentivise growth of the local business tax base, with a view to increasing NDR income yields. The Scottish Government set annual targets for growth (buoyancy) and councils which achieved their target retained 50% of the additional income generated above the target. The annual buoyancy target for South Lanarkshire Council in 2024/2025 had been set by the Scottish Government at 0.9%. Buoyancy for 2024/2025 was 1.09%. The tax base exceeded the final target by 0.19% which should result in the securing of additional income under the scheme of approximately £0.106 million in relation to 2024/2025. The Scottish Government would confirm the value before payment was made to the Council and this could take some time based on previous experience. It was proposed that the following debts be written off:- irrecoverable Council Tax accounts from 1993/1994 to 2024/2025 (including bulk write-off for 2001/2002) to the value of £1,631,922.33 relating primarily to prescribed debt, sequestrations and estates of the deceased irrecoverable non-domestic rates from 2023/2024 to 2025/2026 to the value of £168,511.50 relating primarily to debtors in liquidation, those who had ceased trading or had been sequestrated BID levies totalling £2,001.15 administered by the Council on behalf of Hamilton, Carluke and Lanark BID companies sundry debts to a value of £240,306.89 former tenant rent arrears totalling £272,327.44 and factoring arrears of £265.50 school meal debt totalling £107,000 (funded by Scottish Government grant of £224,000) 8
Page 9
The Committee decided: (1) that the Council’s performance in the collection of revenues be noted; (2) that the current position in respect of the Non Domestic Rates Incentivisation Scheme be noted; and (3) that the write-off of the following irrecoverable debts be approved:- Council Tax debt from 1993/1994 to 2024/2025 to the value of £1,631,922.33 Non Domestic Rates from 2023/2024 to 2025/2026 totalling £168,511.50 BID levies totalling £2,001.15 sundry debts to a value of £240,306.89 house rent and associated charges totalling £272,592.94 school meal debt totalling £107,000 [Reference: Minutes of 26 March 2025 (Paragraph 8)] 10 2025/2026 Information and Communication Technology (ICT) Asset Management Plan A report dated 21 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted advising on the outcomes of the 2025/2026 Information and Communication Technology (ICT) Asset Management Plan. The ICT Asset Management Plan outlined the priorities and strategies required to develop and support the ICT asset estate which was in place to support the business objectives of the Council whilst ensuring business continuity. The plan highlighted the key actions planned for the year ahead, ensuring that the Council’s ICT Assets were fit for purpose. Details of the key actions were provided in the report and a copy of the proposed 2025/2026 ICT Asset Management Plan was attached as Appendix 1 to the report. The Committee decided: that the ICT Asset Management Plan for 2025/2026 be approved [Reference: Minutes of 22 May 2024 (Paragraph 11)] 11 Gaelic Language Plan A report dated 7 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on the Gaelic Language Plan 2025 to 2030. The Gaelic Language (Scotland) Act was passed by the Scottish Parliament in 2005 with the aim of reversing the declining use of the Gaelic language. As part of the Act, Bòrd na Gàidhlig (the Bòrd) was created to develop and oversee the National Plan for Gaelic which set out a strategy to increase the occasions and circumstances in which Gaelic could be used with equity to English. One of the key features of the 2005 Act was the provision enabling the Bòrd to require a public authority to prepare a Gaelic Language Plan (GLP). This provision was designed to ensure that the public sector in Scotland played its part in creating a sustainable future for Gaelic by raising the status and profile of the language and creating practical opportunities for its use. 9
Page 10
The Council’s GLP 2025 to 2030, as detailed in Appendix 1 to the report, was a proportionate response to the statutory duty that the Council had, acknowledging both the size of the Gaelic speaking community and working within the financial climate that currently existed. Following a request from a member, the Head of Personnel Services agreed to link in with Education Resources in terms of activities taking place at present and what was being done to promote Gaelic and feed that information back to the member. In response to a member’s question, the Executive Director (Finance and Corporate Resources) agreed to provide details on how much funding the Council received to all members of the Committee. The Committee decided: that the Gaelic Language Plan 2025 to 2030, attached as Appendix 1 of the report, be approved for final submission to Bòrd na Gàidhlig. [Reference: Minutes of the Executive Committee of 13 February 2019 (Paragraph 15)] 12 Amendment to Local Government Pension Scheme Discretions Policy A report dated 11 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on an amendment to the Council’s Statement of Policy in discretions in relation to the Local Government Pensions Scheme (LGPS) 2015 (Scotland), as governed by the 2018 regulations. Employers participating in the Local Government Pension Scheme (LGPS) in Scotland were required to formulate, publish and keep under review a policy statement on certain discretions which they had the power to exercise in relation to members of the CARE pension scheme (enacted on 1 April 2015). Employers also had the same duties in relation to discretions relating to members of pension schemes in place prior to 2015. The Council’s existing list of discretions, which also covered Lanarkshire Valuation Joint Board, Seemis LLP and South Lanarkshire Leisure and Culture, had been approved by this Committee on 18 March 2015. In 2016, the LGPS (Scotland) regulations were amended to provide employers with the discretion to implement a shared cost additional voluntary contributions (SCVAC) via salary sacrifice. A saving linked to the introduction of this scheme was approved at the February 2025 budget meeting. The Council was working to implement a salary sacrifice scheme and had to consequently update its discretions policy to that effect. To align with the scheme being launched, the Council was required to enable regulation 17 (clause 1) of the above regulations, which provided employers with the discretion to offer their workforce the opportunity to contribute to a salary sacrifice scheme (SCVAC). The updated policy statement on the Council’s employer discretions was detailed in full at Appendix 1 to the report. Once approved, the updated discretions policy would be published on the Council’s intranet. The Committee decided: (1) that the content of the report be noted; and (2) that the revision to the Statement of Policy in respect of the Local Government Pensions Scheme employer discretions be approved. [Reference: Minutes of 18 March 2015 (Paragraph 9)] 10
Page 11
13 Review of Procurement Strategy for 2025/2026 A report dated 12 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on:- progress in the Procurement Strategy Action Plan to March 2025 the annual review of the Procurement Strategy for 2025/2026 the Procurement Strategy Action Plan for 2025/2026 The Council’s Procurement Strategy 2023 to 2028 was approved by the Executive Committee on 17 May 2023. The Procurement Strategy 2023 to 2028 included 7 key strategic objectives, which linked to key outcomes for the Procurement Service. An update on each of those objectives and evidence of progress in working towards those outcomes was included in Appendix 1 to the report. The Procurement Strategy Action Plan included specific projects for 2024/2025 in support of those strategic objectives which included 8 actions. Progress made to the end of March 2025 was detailed in Appendix 2 to the report. The Council was required to review the Procurement Strategy annually and this was the second review of the 2023 to 2028 Strategy. The updated Strategy was attached as Appendix 3 to the report. The key strategic objectives had been reviewed and updated to reflect current and emerging issues and a number of strategic objectives had been expanded during this review period. Appendix 4 detailed the proposed Procurement Strategy Action Plan for 2025/2026. The specific actions contributed towards the achievement of the procurement strategic objectives and included:- continued focus on procurement compliance, reflecting the new arrangements under Oracle Fusion the introduction of whole life costing process for appropriate contracts an updated sourcing strategy and tender documentation for the Safe Staffing Act, Armed Forces Covenant and Breastfeeding Friendly scheme The Committee decided: that the report be noted. [Reference: Minutes of 22 May 2024 (Paragraph 14) and Minutes of the Executive Committee of 17 May 2023 (Paragraph 12)] 14 Notification of Contracts Awarded - 1 October 2024 to 31 March 2025 A report dated 8 May 2025 by the Executive Director (Finance and Corporate Resources) was submitted on contracts awarded by Finance and Corporate Resources during the period 1 October 2024 to 31 March 2025. In terms of Standing Oder Nos 21.8 and 22.5 of the Standing Orders on Contracts, Resources were required to notify the relevant Committee of contracts awarded. Details of the contracts awarded by Finance and Corporate Resources were provided in the appendix to the report. The Committee decided: that the report be noted. [Reference: Minutes of 29 January 2025 (Paragraph 12)] 11
Page 12
15 Urgent Business There were no items of urgent business. 12
Page 13
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Finance and Corporate Resources - Revenue Budget Monitoring 2024/2025 1. Purpose of Report 1.1. The purpose of the report is to:- [p provide information on the actual expenditure measured against the revenue budget for the period 1 April 2024 to 31 March 2025 for Finance and Corporate Resources [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s): [recs] (1) that the position to 31 March 2025 of a breakeven position after approved transfer to reserves as detailed in Appendix A of the report be noted; and (2) that the proposed budget virements be approved. 3. Background 3.1. This is the final revenue budget monitoring report presented to the Finance and Corporate Resources Committee for the financial year 2024/2025. 3.2. The report details the financial position for Finance and Corporate Resources. Appendix A provides the service analysis statement, outlining key highlights by Service for the Resource and appendices B to I provides the detailed financial position with variance explanations by budget category. 3.3. This report reflects the actual spend to 31 March 2025 4. Employee Implications 4.1. None. 5. Financial Implications 5.1. As at 31 March 2025, the actual outturn position for 2024/2025 is an underspend of £2.092 million before approved transfers to reserves. This is outlined in the attached appendices. 5.2. The underspend is mainly due to additional funding provided for the Scottish Welfare Fund. Due to the timing of this funding being awarded, the majority of this has been carried forward for use next financial year. In addition, there are underspends from 3 13
Page 14
vacant posts across the Services, on the Empty Property Relief (EPR) budget and on the Grants budget that has been carried forward to support the 2025/2026 saving. 5.3. The position after approved transfers to reserves is a breakeven position. This position has been reported and approved as part of the overall Council final position for 2024/2025 reported to Executive Committee on 25 June 2025. 5.4. Virements are proposed to realign budgets across budget categories and with other Resources. These movements have been detailed in the appendices to this report, as appropriate. 6. Climate Change, Sustainability and Environmental Implications 6.1. There are no implications for climate change, sustainability, or the environment in terms of the information contained in this report. 7. Other Implications 7.1. The main risk associated with the Council’s Revenue Budget is that there is an overspend. The risk has been assessed as low given the detailed budget management applied across the Resources. The risk is managed through four weekly Budget Monitoring Meetings at which any variance is analysed. In addition, the probable outturn exercise ensures early warning for corrective action to be taken where appropriate. 8. Integrated Impact Assessment and Consultation Requirements 8.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function, or strategy and, therefore, no impact assessment is required. 8.2. There is also no requirement to undertake any consultation in terms of the information contained in the report. Jackie Taylor Executive Director (Finance and Corporate Resources) 12 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, Effective, Efficient and Transparent Previous References None List of Background Papers Financial ledger and budget monitoring results to 31 March 2025 14
Page 15
Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Lorraine O’Hagan, Head of Finance (Strategy) Ext: 5637 (Tel: 01698 455637) E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 15
Page 16
Appendix A SOUTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Revenue Budget Monitoring Report – Service Analysis Service Analysis Revised Annual Budget (£000) YTD Actual (£000) Variance (£000) % Strategy 2,254 2,312 (58) (2.57%) Transactions 18,136 16,295 1,841 10.15% Audit 358 315 43 12.01% Information Technology 7,112 7,242 (130) (1.83%) Communications and Strategy 2,803 2,516 287 10.24% Administration, Legal, Licensing and Registration 4,265 4,025 240 5.63% Personnel 6,314 6,445 (131) (2.07%) Net Controllable Exp. 41,242 39,150 2,092 5.07% Service Heading Explanation for significant projected outturn variances Strategy No significant variances to report. (Appendix C). Transactions The underspend is mainly due to additional funding provided for the Scottish Welfare Fund. Due to the timing of this funding being awarded, the majority of this has been carried forward for use next financial year. In addition, there are underspends from vacant posts within the Service and on the Empty Property Relief (EPR) budget. (Appendix D). Transfers to reserves of £1.956m have been approved by the Executive Committee on 25 June: £1.153m Scottish Welfare Fund and £0.803m Insurance Fund. Audit No significant variances to report. (Appendix E). Information Technology The overspend is due to greater than budgeted IT subscription, licensing and contract costs within Supplies and Services, which are partially offset by an over recovery of income. This is partially offset by underspends from vacant posts and less than budgeted telephony contract costs (Appendix F). Communications and Strategy The underspend is due to turnover within the Service and an over recovery of income from the level of rechargeable work undertaken within the print room. (Appendix G). A transfer to reserves of £0.030m has been approved by the Executive Committee on 25 June in relation to Sanitary Products. Administration, Legal, Licensing and Registration The underspend is due to less than budgeted spend on the Grants budget within Payments to Other Bodies, and reduced superannuation contributions in the financial year. (Appendix H). A transfer to reserves of £0.106m has been approved by the Executive Committee on 25 June in relation to the Grants underspend to support the 2025/2026 saving. Personnel The overspend is due to a lower than budgeted level of turnover and higher than budgeted IT equipment leasing costs during the financial year. In addition, there is an under recovery of income relating to lower than budgeted income from third party settlements. These are partially offset by an underspend relating to lower than anticipated legal costs in the financial year. (Appendix I). 16
Page 17
Appendix B SOUTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Finance & Corporate Resources Summary Variance Explanations Variance explanations are shown in Appendices C to I as appropriate. Budget Virements Budget Virements are noted in Appendices C to I as appropriate. Approved Transfers to Reserves Detailed in Appendices C to I as appropriate. Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Over/ Under % Variance Note £000 £000 £000 £000 £000 Employee Costs 33,819 33,531 288 33,398 421 under 1.24% Property Costs 4,963 4,283 680 3,105 1,858 under 37.44% Supplies & Services 8,228 8,743 (515) 8,712 (484) over (5.88%) Transport & Plant 28 17 11 16 12 under 42.86% Administration Costs 7,765 7,681 84 7,656 109 under 1.40% Payments to Other Bodies 4,093 3,948 145 3,831 262 under 6.40% Payments to Contractors 277 314 (37) 348 (71) over (25.63%) Transfer Payments 65,934 60,661 5,273 62,086 3,848 under 5.84% Financing Charges 1,404 1,436 (32) 1,526 (122) over (8.69%) Total Controllable Exp. 126,511 120,614 5,897 120,678 5,833 under 4.61% Total Controllable Inc. (85,269) (80,228) (5,041) (81,528) (3,741) under recovered (4.39%) Net Controllable Exp. 41,242 40,386 856 39,150 2,092 under 5.07% Transfer to Reserves 0 856 (856) 2,092 (2,092) Position after Transfer to Reserves 41,242 41,242 0 41,242 0 17
Page 18
Appendix C South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Finance – Strategy Services Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 2,839 2,820 19 2,877 (38) over (1.34%) a Property Costs 0 0 0 0 0 - 0.00% Supplies & Services 15 19 (4) 23 (8) over (53.33%) Transport & Plant 0 0 0 0 0 - 0.00% Administration Costs 114 121 (7) 135 (21) over (18.42%) Payments to Other Bodies 637 642 (5) 635 2 under 0.31% Payments to Contractors 16 26 (10) 24 (8) over (50.00%) Transfer Payments 0 0 0 0 0 - 0.00% Financing Charges 20 20 0 22 (2) over (10.00%) Total Controllable Exp. 3,641 3,648 (7) 3,716 (75) over (2.06%) Total Controllable Inc. (1,387) (1,382) (5) (1,404) 17 over recovered 1.23% b Net Controllable Exp. 2,254 2,266 (12) 2,312 (58) over (1.34%) Transfer to Reserves - - - - - Position after Transfer to Reserves 2,254 2,266 (12) 2,312 (58) Variance Explanations None. Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.013m. Employee Costs £0.013m. b. Realignment of Central Support Charges to reflect actual income. Net effect £0.307m: Income £0.307m. 18
Page 19
Appendix D South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Finance – Transactions Services Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 12,573 12,431 142 12,300 273 under 2.17% 1, a Property Costs 4,953 4,234 719 3,044 1,909 under 38.54% 2 Supplies & Services 752 845 (93) 783 (31) over (4.12%) Transport & Plant 4 3 1 0 4 under 100.00% Administration Costs 1,490 1,622 (132) 1,543 (53) over (3.56%) Payments to Other Bodies 1,504 1,524 (20) 1,519 (15) over (1.00%) Payments to Contractors 261 288 (27) 298 (37) over (14.18%) Transfer Payments 65,934 60,661 5,273 62,086 3,848 under 5.84% 3 Financing Charges 105 106 (1) 137 (32) over (30.48%) Total Controllable Exp. 87,576 81,714 5,862 81,710 5,866 under 6.70% Total Controllable Inc. (69,440) (64,311) (5,129) (65,415) (4,025) under recovered (5.80%) 4, b Net Controllable Exp. 18,136 17,403 733 16,295 1,841 under 10.15% Transfer to Reserves - 750 (750) 1,956 (1,956) i, ii Position after Transfer to Reserves 18,136 18,153 (17) 18,251 (115) Variance Explanations 1. The underspend in Employee Costs is due to turnover experienced during the year. 2. The underspend is due to additional funding provided for the Scottish Welfare Fund. Due to the timing of this funding being awarded, the majority of this will be carried forward for use next financial year (refer i below). In addition, there is an underspend on the Empty Property Relief (EPR) budget. 3. The underspend reflects the demand-led spend on Rent Allowance and Rent Rebates and is offset by an under- recovery of Income (refer 4 below). 4. The under recovery is offset by the demand-led underspend in Transfer Payments (refer 3 above). Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.054m. Employee Costs £0.54m b. Realignment of Central Support Charges to reflect actual income. Net effect £0.251m: Income £0.251m. Transfer to Reserves i. Scottish Welfare Fund - This funding forms part of the 2024/2025 revenue grant redeterminations and has been carried forward for use in 2025/2026 (£1.153m). ii. Insurance Fund - A contribution to reflect additional Fund costs resulting from significant storm events over recent financial years, including storm Eowyn (£0.803m). 19
Page 20
Appendix E South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Audit Services Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 490 456 34 451 39 under 7.96% a Property Costs 0 0 0 1 (1) over - Supplies & Services 7 5 2 4 3 under 42.86% Transport & Plant 0 0 0 0 0 - - Administration Costs 6 4 2 3 3 under 50.00% Payments to Other Bodies 0 0 0 0 0 - - Payments to Contractors 0 0 0 0 0 - - Transfer Payments 0 0 0 0 0 - - Financing Charges 4 3 0 5 (1) over (25.00%) Total Controllable Exp. 507 469 38 464 43 under 8.48% Total Controllable Inc. (149) (149) 0 (149) 0 - - b Net Controllable Exp. 358 320 38 315 43 under 12.01% Transfer to Reserves - - - - - Position after Transfer to Reserves 358 320 38 315 43 Variance Explanations None. Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.002m. Employee Costs £0.002m b. Realignment of Central Support Charges to reflect actual income. Net effect £0.018m: Income £0.018m. 20
Page 21
Appendix F South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Information Technology Services Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 5,534 5,477 57 5,462 72 under 1.30% 1, a Property Costs 0 0 0 0 0 - - Supplies & Services 6,502 6,930 (428) 7,007 (505) over (7.77%) 2 Transport & Plant 4 2 2 1 3 under 75.00% Administration Costs 1,591 1,489 102 1,461 130 under 8.17% 3 Payments to Other Bodies 0 0 0 0 0 - - Payments to Contractors 0 0 0 0 0 - - Transfer Payments 0 0 0 0 0 - - Financing Charges 823 826 (3) 867 (44) over (5.35%) Total Controllable Exp. 14,454 14,724 (270) 14,798 (344) over (2.38%) Total Controllable Inc. (7,342) (7,480) 138 (7,556) 214 over recovered 2.91% 4, b Net Controllable Exp. 7,112 7,244 (132) 7,242 (130) over (1.83%) Transfer to Reserves - - - - - Position after Transfer to Reserves 7,112 7,244 (132) 7,242 (130) Variance Explanations 1. The underspend reflects turnover experienced through the year. 2. The overspend is due to greater than budgeted IT subscription, licensing and contract costs which are partially offset by an over recovery of income (see 4 below). 3. The underspend reflects less than budgeted telephony contract costs during the financial year. 4. The projected over recovery of income reflects greater than budgeted level of recharges during the financial year which partially offsets the increased IT costs above (refer 2). Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.021m. Employee Costs £0.021m. b. Realignment of Central Support Charges to reflect actual income. Net effect (£0.893m): Income (£0.893m). 21
Page 22
Appendix G South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Communications and Strategy Services Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 2,268 2,146 122 2,156 112 under 4.94% 1, a Property Costs 0 0 0 0 0 - - Supplies & Services 668 655 13 604 64 under 9.58% Transport & Plant 7 4 3 6 1 under 14.29% Administration Costs 1,165 1,163 2 1,162 3 under 0.26% Payments to Other Bodies 990 990 0 984 6 under 0.61% Payments to Contractors 0 0 0 0 0 - - Transfer Payments 0 0 0 0 0 - - Financing Charges 351 347 4 347 4 under 1.14% Total Controllable Exp. 5,449 5,305 144 5,259 190 under 3.49% Total Controllable Inc. (2,646) (2,691) 45 (2,743) 97 over recovered 3.67% 2, b Net Controllable Exp. 2,803 2,614 189 2,516 287 under 10.24% Transfer to Reserves - - - 30 (30) i Position after Transfer to Reserves 2,803 2,614 159 2,546 257 Variance Explanations 1. The underspend is due to turnover experienced in the year. 2. The over recovery is due to level of rechargeable work undertaken within the print room. Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.010m. Employee Costs £0.010m. b. Realignment of Central Support Charges to reflect actual income. Net effect £0.083m: Income £0.083m. Transfer to Reserves i. Sanitary Products - The underspend is required to be carried forward to fulfil orders placed before the end of the financial year. Due to timing, these will be received in 2025/2026 (£0.030m). 22
Page 23
Appendix H South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Administration, Legal, Licensing and Registration Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 3,618 3,632 (14) 3,616 2 under 0.06% a Property Costs 10 9 1 10 0 - 0.00% Supplies & Services 163 152 11 161 2 under 1.23% Transport & Plant 4 6 (2) 7 (3) over (75.00%) Administration Costs 2,334 2,283 51 2,282 52 under 2.23% 1 Payments to Other Bodies 678 572 106 504 174 under 25.66% 2 Payments to Contractors 0 0 0 0 0 - - Transfer Payments 0 0 0 0 0 - - Financing Charges 65 66 (1) 67 (2) over (3.08%) Total Controllable Exp. 6,872 6,720 152 6,647 225 under 3.27% Total Controllable Inc. (2,607) (2,607) 0 (2,622) 15 over recovered 0.58% b Net Controllable Exp. 4,265 4,113 152 4,025 240 under 5.63% Transfer to Reserves 0 106 (106) 106 (106) i Position after Transfer to Reserves 4,265 4,219 46 4,131 134 Variance Explanations 1. The underspend is due to reduced superannuation contributions in the financial year. 2. The underspend relates to less than budgeted spend on the Grants budget which has been set aside to support the use of reserves as part of the 2025/2026 savings proposal (refer i below). Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.022m. Employee Costs £0.022m. b. Realignment of Central Support Charges to reflect actual income. Net effect £0.129m: Income £0.129m. Transfer to Reserves i. Grants to Voluntary Organisations - An underspend on the Grants has been transferred to reserves to support the 2025/2026 saving (£0.106m). 23
Page 24
Appendix I South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 31 March 2025 (No. 14) Personnel Budget Category Revised Annual Budget Forecast for Year Forecast Variance YTD Actual YTD Variance Under/ (Over) % Variance Note £000 £000 £000 £000 £000 Employee Costs 6,497 6,569 (72) 6,536 (39) over (0.60%) 1, a Property Costs 0 40 (40) 50 (50) over - Supplies & Services 121 137 (16) 130 (9) over (7.44%) Transport & Plant 9 2 7 2 7 under 77.78% Administration Costs 1,065 999 66 1,070 (5) over (0.47%) Payments to Other Bodies 284 220 64 189 95 under 33.45% 2 Payments to Contractors 0 0 0 26 (26) over - Transfer Payments 0 0 0 0 0 - - Financing Charges 36 67 (31) 81 (45) over (125.00%) Total Controllable Exp. 8,012 8,034 (22) 8,084 (72) over (0.90%) Total Controllable Inc. (1,698) (1,608) (90) (1,639) (59) under recovered (3.47%) 3, b Net Controllable Exp. 6,314 6,426 (112) 6,445 (131) over (2.07%) Transfer to Reserves - - - - - Position after Transfer to Reserves 6,314 6,426 (112) 6,445 (131) Variance Explanations 1. The overspend is due to a lower than budgeted level of turnover during the financial year. 2. The underspend relates to lower than budgeted legal costs in the financial year. 3. The under recovery of income mainly relates to lower than budgeted income from third party settlements. Budget Virements a. Apprenticeship Levy Allocation. Net effect £0.027m. Employee Costs £0.027m. b. Realignment of Central Support Charges to reflect actual income. Net effect (£0.038m): Income (£0.038m). 24
Page 25
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Finance and Corporate Resources - Revenue Budget Monitoring 2025/2026 1. Purpose of Report 1.1. The purpose of the report is to:- [p provide information on the actual expenditure measured against the revenue budget for the period 1 April to 11 July 2025 for Finance and Corporate Resources provide a forecast for the year to 31 March 2026 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s): [recs] (1) that the projected break-even position on the 2025/2026 revenue budget for Finance and Corporate Resources’, as detailed in Appendix B of the report, be noted; and (2) that the proposed budget virements be approved. 3. Background 3.1. This is the first revenue budget monitoring report presented to the Finance and Corporate Resources Committee for the financial year 2025/2026. 3.2. The report details the financial position for Finance and Corporate Resources. Appendix A provides the service analysis statement, outlining key highlights by Service for the Resource and Appendix B provides the detailed financial position with variance explanations by budget category. Any variance explanations and proposed budget virements are shown, where relevant, in appendices C to I. 3.3. This report reflects the actual spend to 11 July 2025 for the Resource budget and the expected outturn forecast on expenditure and income at this date. 4. Employee Implications 4.1. None. 5. Financial Implications 5.1. Appendix A is the service analysis statement and will outline the key projected outturn variances by Service for the Resource. 4 25
Page 26
5.2. Virements are proposed to realign budgets across budget categories and with other Resources. These movements have been detailed in appendices C to I, where relevant. 6. Climate Change, Sustainability and Environmental Implications 6.1. There are no implications for climate change, sustainability, or the environment in terms of the information contained in this report. 7. Other Implications 7.1. The main risk associated with the Council’s Revenue Budget is that there is an overspend. There are inflationary and budget pressures which could increase the risk of overspend, however these are mitigated by additional funds being added to the budget. 7.2. The risk is managed through four weekly Budget Monitoring meetings at which any variance is analysed. In addition, the new forecasting within FUSION and work with the Resource and finance teams, ensures early warning for corrective action to be taken where appropriate. 8. Integrated Impact Assessment and Consultation Requirements 8.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function, or strategy and, therefore, no impact assessment is required. 8.2. There is also no requirement to undertake any consultation in terms of the information contained in the report. Jackie Taylor Executive Director (Finance and Corporate Resources) 12 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, Effective, Efficient and Transparent Previous References None List of Background Papers Financial Ledger and budget monitoring results to 11 July 2025. Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Lorraine O’Hagan, Head of Finance (Strategy) Ext: 5637 (Tel: 01698 455637) E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 26
Page 27
Appendix A SOUTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Revenue Budget Monitoring Report – Service Analysis Service Analysis Revised Annual Budget (£000) Projected Outturn (£000) Projected Outturn Variance (£000) % YTD Actual (£000) Strategy 2,018 2,071 (53) (2.63%) 952 Transactions 17,258 17,051 207 1.20% 7,692 Audit 339 301 38 11.21% 131 Information Technology 7,775 7,775 0 0.00% 5,488 Communications and Strategy 2,257 2,242 15 0.66% 820 Administration, Legal, Licensing and Registration 3,798 3,905 (107) (2.82%) 1,728 Personnel 6,339 6,439 (100) (1.58%) 1,872 Net Controllable Exp. 39,784 39,784 0 0.00% 18,683 Service Heading Explanation for significant projected outturn variances Strategy The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year. (Appendix C). Transactions The projected underspend is due to less than budgeted spend on Empty Property Relief (EPR) anticipated and an over recovery of income reflecting additional commission received from Scottish Water. (Appendix D). Audit The projected underspend is due to turnover within the Service. (Appendix E). Information Technology The projected breakeven position reflects turnover experienced within the Service offset by greater than budgeted IT subscription, licensing and contract costs and costs of training. (Appendix F). Communications and Strategy No significant projected outturn variances to report. (Appendix G). Administration, Legal, Licensing and Registration The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year. (Appendix H). Personnel The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year and higher than budgeted IT equipment leasing costs. (Appendix I). 27
Page 28
Appendix B SOUTH LANARKSHIRE COUNCIL Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Finance & Corporate Resources Summary Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 33,331 33,499 (168) over (0.50%) 8,990 Property Costs 3,855 3,649 206 under 5.34% 306 Supplies & Services 7,960 8,042 (82) over (1.03%) 4,104 Transport & Plant 35 35 0 - 0.00% 1 Administration Costs 7,587 7,635 (48) over (0.63%) 2,114 Payments to Other Bodies 3,346 3,350 (4) over (0.12%) 1,496 Payments to Contractors 284 302 (18) over (6.34%) 98 Transfer Payments 65,924 65,924 0 - 0.00% 13,525 Financing Charges 1,416 1,462 (46) over (3.25%) 996 Total Controllable Exp. 123,738 123,898 (160) over (0.13%) 31,630 Total Controllable Inc. (83,954) (84,114) 160 over recovered 0.19% (12,947) Net Controllable Exp. 39,784 39,784 0 - 0.00% 18,683 Variance Explanations Variance explanations are shown in Appendices C to I as appropriate. Budget Virements Budget Virements are noted in Appendices C to I as appropriate. 28
Page 29
Appendix C South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Finance – Strategy Services Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual £000 £000 £000 £000 Note Employee Costs 2,824 2,888 (64) over (2.27%) 815 1 Property Costs 0 0 0 - 0.00% 0 Supplies & Services 15 15 0 - 0.00% 2 Transport & Plant 0 0 0 - 0.00% 0 Administration Costs 114 119 (5) over (4.39%) 7 Payments to Other Bodies 665 667 (2) over (0.30%) 120 Payments to Contractors 23 23 0 - 0.00% 16 Transfer Payments 0 0 0 - 0.00% 0 Financing Charges 20 20 0 - 0.00% 0 Total Controllable Exp. 3,661 3,732 (71) over (1.94%) 960 Total Controllable Inc. (1,643) (1,661) 18 over recovered 1.10% (8) Net Controllable Exp. 2,018 2,071 (53) over (2.63%) 952 Variance Explanations 1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year. Budget Virements None. 29
Page 30
Appendix D South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Finance – Transactions Services Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 12,224 12,272 (48) over (0.39%) 3,284 1, a Property Costs 3,710 3,504 206 under 5.55% 294 2 Supplies & Services 777 812 (35) over (4.50%) 599 Transport & Plant 4 4 0 - 0.00% 0 Administration Costs 1,236 1,276 (40) over (3.24%) 472 b Payments to Other Bodies 1,500 1,500 0 - 0.00% 873 Payments to Contractors 261 279 (18) over (6.90%) 82 Transfer Payments 65,924 65,924 0 - 0.00% 13,525 Financing Charges 105 105 0 - 0.00% 0 Total Controllable Exp. 85,741 85,676 65 under 0.08% 19,129 Total Controllable Inc. (68,483) (68,625) 142 over recovered (0.21%) (11,437) 3, a Net Controllable Exp. 17,258 17,051 207 under 1.20% 7,692 Variance Explanations 1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year. 2. The projected underspend reflects less than budgeted spend on the Empty Property Relief (EPR) budget. 3. The projected over recovery of income reflects additional commission received from Scottish Water for the collection of water and sewage. Budget Virements a. Procurement Saving realignment in relation to rebates: Net Effect (£0.000m): Employee Costs £0.150m, Income (£0.150m). b. Scottish Welfare Fund Drawdown from Reserves: Net Effect £0.044m: Administration Costs £0.044m. 30
Page 31
Appendix E South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Audit Services Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 489 449 40 under 8.18% 131 1 Property Costs 0 0 0 - 0.00% 0 Supplies & Services 6 6 0 - 0.00% 0 Transport & Plant 0 0 0 - 0.00% 0 Administration Costs 7 7 0 - 0.00% 0 Payments to Other Bodies 0 2 (2) over 0.00% 2 Payments to Contractors 0 0 0 - 0.00% 0 Transfer Payments 0 0 0 - 0.00% 0 Financing Charges 4 4 0 - 0.00% 0 Total Controllable Exp. 506 468 38 under 7.51% 133 Total Controllable Inc. (167) (167) 0 - 0.00% (2) Net Controllable Exp. 339 301 38 under 11.21% 131 Variance Explanations 1. The projected underspend is due to the level of turnover being experienced during the year. Budget Virements None. 31
Page 32
Appendix F South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Information Technology Services Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 5,400 5,326 74 under 1.37% 1,422 1 Property Costs 0 0 0 - 0.00% 0 Supplies & Services 6,371 6,410 (39) over (0.61%) 3,269 2 Transport & Plant 4 4 0 - 0.00% 0 Administration Costs 1,591 1,626 (35) over (2.20%) 437 3 Payments to Other Bodies 0 0 0 - 0.00% 0 Payments to Contractors 0 0 0 - 0.00% 0 Transfer Payments 0 0 0 - 0.00% 0 Financing Charges 835 835 0 - 0.00% 792 Total Controllable Exp. 14,201 14,201 0 - 0.00% 5,920 Total Controllable Inc. (6,426) (6,426) 0 - 0.00% (432) Net Controllable Exp. 7,775 7,775 0 - 0.00% 5,488 Variance Explanations 1. The projected underspend is due to the level of turnover being experienced during the year. 2. The projected overspend is due to greater than budgeted IT subscription, licensing and contract costs. 3. The projected overspend is due to planned additional training costs in relation to system requirements. Budget Virements None. 32
Page 33
Appendix G South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Communications and Strategy Services Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 2,257 2,242 15 under 0.66% 624 Property Costs 140 140 0 - 0.00% 11 Supplies & Services 508 508 0 - 0.00% 133 Transport & Plant 5 5 0 - 0.00% 0 Administration Costs 1,102 1,102 0 - 0.00% 148 Payments to Other Bodies 539 539 0 - 0.00% 170 Payments to Contractors 0 0 0 - 0.00% 0 Transfer Payments 0 0 0 - 0.00% 0 Financing Charges 351 351 0 - 0.00% 204 Total Controllable Exp. 4,902 4,887 15 under 0.31% 1,290 Total Controllable Inc. (2,645) (2,645) 0 - 0.00% (470) Net Controllable Exp. 2,257 2,242 15 under 0.66% 820 Variance Explanations None. Budget Virements None. 33
Page 34
Appendix H South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Administration, Legal, Licensing and Registration Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 3,602 3,741 (139) over (3.86%) 967 1 Property Costs 5 5 0 - 0.00% 1 Supplies & Services 162 162 0 - 0.00% 82 Transport & Plant 13 13 0 - 0.00% 1 Administration Costs 2,332 2,300 32 under 1.37% 841 Payments to Other Bodies 408 408 0 - 0.00% 281 Payments to Contractors 0 0 0 - 0.00% 0 Transfer Payments 0 0 0 - 0.00% 0 Financing Charges 65 65 0 - 0.00% 0 Total Controllable Exp. 6,587 6,694 (107) over (1.62%) 2,173 Total Controllable Inc. (2,789) (2,789) 0 - 0.00% (445) Net Controllable Exp. 3,798 3,905 (107) over (2.82%) 1,728 Variance Explanations 1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year. Budget Virements None. . 34
Page 35
Appendix I South Lanarkshire Council Revenue Budget Monitoring Report Finance & Corporate Resources Committee: Period Ended 11 July 2025 (No. 4) Personnel Revised Projected Budget Category Annual Projected Outturn Over/ % YTD Budget Outturn Variance Under Variance Actual Note £000 £000 £000 £000 Employee Costs 6,535 6,581 (46) over (0.70%) 1,747 1 Property Costs 0 0 0 - 0.00% 0 Supplies & Services 121 129 (8) over (6.61%) 19 Transport & Plant 9 9 0 - 0.00% 0 Administration Costs 1,205 1,205 0 - 0.00% 209 Payments to Other Bodies 234 234 0 - 0.00% 50 Payments to Contractors 0 0 0 - 0.00% 0 Transfer Payments 0 0 0 - 0.00% 0 Financing Charges 36 82 (46) over (127.78%) 0 2 Total Controllable Exp. 8,140 8,240 (100) over (1.23%) 2,025 Total Controllable Inc. (1,801) (1,801) 0 - 0.00% (153) Net Controllable Exp. 6,339 6,439 (100) over (1.58%) 1,872 Variance Explanations 1. The projected overspend is due to a lower than budgeted level of turnover anticipated during the financial year. 2. The projected overspend is due to higher than budgeted IT equipment leasing costs. Budget Virements None. 35
Page 36
36
Page 37
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Finance and Corporate Resources Committee - Capital Budget Monitoring 2024/2025 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide information on the progress of the capital programme for Finance and Corporate Resources for the period 1 April 2024 to 31 March 2025 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendations: [recs] (1) that the Finance and Corporate Resources’ Capital Programme of £3.086 million, and expenditure for the year of £3.790 million, be noted. [1recs] 3. Background 3.1. This is the final capital monitoring report presented to the Finance and Corporate Resources Committee for the financial year 2024/2025. 3.2. As noted in the last report to this Committee 26 March 2025, the budget for Finance and Corporate Resources for financial year 2024/2025 was £3.086 million. This was the final budget for the year 2024/2025. 3.3. The report details the financial position for Finance and Corporate Resources in Appendix A. 4. Employee Implications 4.1. There are no employee implications as a result of this report. 5. Financial Implications 5.1. 2024/2025 Capital Programme – Final Position As detailed in Section 3.2, the total capital programme for Finance and Corporate Resources for 2024/2025 was £3.086 million. Total expenditure to the 31 March 2025 was £3.790 million, a difference of £0.704 million in comparison to the programme of £3.086 million. 5.2. The position reflects additional funded spend on IT Infrastructure projects (spend and funding transferred from Revenue). An update on the 2025/2026 programme is detailed in a separate report to this Committee. 5 37
Page 38
6. Climate Change, Sustainability and Environmental Implications 6.1. There are no implications for climate change, sustainability, or the environment in terms of the information contained in this report. 7. Other Implications 7.1. The main risk associated with the Council’s Capital Programme is that there is an overspend. The risk has been assessed as low given the detailed project management plans prepared and monitored for each project. The risk of overspend is managed through four weekly Investment Management Meetings. 8. Integrated Impact Assessment and Consultation Requirements 8.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 8.2. There is also no requirement to undertake any consultation in terms of the information contained in the report. Jackie Taylor Executive Director (Finance and Corporate Resources) 11 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, Effective, Efficient and Transparent Previous References Finance and Corporate Resources Committee, 11 June 2025 Executive Committee, 25 June 2025 List of Background Papers Financial ledger to 31 March 2025 Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Graham Booth, Finance Manager (Strategy) Ext: 2699 (Tel: 01698 452699) E-mail: graham.booth@southlanarkshire.gov.uk 38
Page 39
Appendix A South Lanarkshire Council Capital Expenditure 2024/2025 Finance and Corporate Resources Programme For Period 1 April 2024 to 31 March 2025 Finance and Corporate Resources Total Original Budget £000 Budget Adjustments £000 Slippage £000 Total Budget £000 Actual Expenditure £000 Information Technology Services 3,086 - - 3,086 3,790 TOTAL 3,086 - - 3,086 3,790 39
Page 40
40
Page 41
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Finance and Corporate Resources - Capital Budget Monitoring 2025/2026 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide information on the progress of the capital programme for Finance and Corporate Resources for the period 1 April to 11 July 2025 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendations:- [recs] (1) that the Finance and Corporate Resources’ Capital Programme of £0.545 million, and forecast expenditure of £0.545 million, be noted. [1recs] 3. Background 3.1. This is the first capital monitoring report presented to the Finance and Corporate Resources Committee for the financial year 2025/2026. Further reports will follow throughout the year. 3.2. The budget of £0.545 million for Finance and Corporate Resources is based on the overall Capital Programme for 2025/2026 approved by the Executive Committee in February 2025, updated to include the budget carried forward from 2024/2025 (Executive Committee, June 2025). 3.3. The report details the financial position for Finance and Corporate Resources in Appendix A. 4. Employee Implications 4.1. There are no employee implications as a result of this report. 5. Financial Implications 5.1. 2025/2026 Budget As detailed in Section 3.2, the revised capital programme for Finance and Corporate Resources for 2024/2025 is £0.545 million. This budget is based on the original programme of projects approved by the Council in February 2025 (£0.300 million), updated to include budget carried forward from financial year 2024/2025 (£0.245 million). 5.2. The budget of £0.545 million reflects the level of spend which can be achieved in 2025/2026, based on current estimates. 6 41
Page 42
5.3. 2025/2026 Forecast Appendix A shows a forecast for the financial year of £0.545 million. For information, actual expenditure to 11 July 2025 is £0.028 million. 6. Climate Change, Sustainability and Environmental Implications 6.1. There are no implications for climate change, sustainability or the environment in terms of the information contained in this report. 7. Other Implications 7.1. The main risk associated with the Council’s Capital Programme is that there is an overspend. The risk has been assessed as low given the detailed project management plans prepared and monitored for each project. The risk of overspend is managed through four weekly Investment Management Meetings. 8. Integrated Impact Assessment and Consultation Requirements 8.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 8.2. There is also no requirement to undertake any consultation in terms of the information contained in the report. Jackie Taylor Executive Director (Finance and Corporate Resources) 11 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, Effective, Efficient and Transparent Previous References South Lanarkshire Council, 26 February 2025 Executive Committee, 25 June 2025 Executive Committee, 27 August 2025 List of Background Papers Financial ledger to 11 July 2025 Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Graham Booth, Finance Manager (Strategy) Ext: 2699 (Tel: 01698 452699) E-mail: graham.booth@southlanarkshire.gov.uk 42
Page 43
Appendix A South Lanarkshire Council Capital Expenditure 2025/2026 Finance and Corporate Resources Programme For Period 1 April 2025 to 11 July 2025 Finance and Corporate Resources Total Original Budget £000 Budget Adjustments £000 Slippage £000 Total Budget £000 Forecast Spend £000 Forecast Variance £000 Actual Expenditure £000 Information Technology Services 545 - - 545 545 - 28 TOTAL 545 - - 545 545 - 28 43
Page 44
44
Page 45
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Finance and Corporate Resources – Workforce Monitoring – 1 April to 30 June 2025 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide employment information for 1 April to 30 June 2025 relating to Finance and Corporate Resources [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s): - [recs] (1) that the following employment information for 1 April to 30 June 2025 relating to Finance and Corporate Resources be noted:- attendance statistics. occupational health. accident/incident statistics. discipline, grievance and Dignity at Work cases. analysis of leavers and exit interviews. Staffing watch as at 14 June 2025 [1recs] 3. Background 3.1. As part of the Council’s performance management arrangements, regular workforce monitoring reports are submitted to Committee. This report for Finance and Corporate Resources provides information on the position for 1 April to 30 June 2025. 4. Monitoring Statistics 4.1. Attendance Statistics (Appendix 1) Information on absence statistics is analysed for the month of June 2025 for Finance and Corporate Resources. The Resource absence figure for June 2025 was 2.9%, this figure has increased by 0.2% when compared to the previous month and is 2.5% lower than the Council-wide figure. Compared to June 2024, the Resource absence figure has decreased by 0.3%. Based on the absence figures at June 2025 and annual trends, the annual average absence for the Resource for 2025/2026 is 3.4% compared to a Council-wide average figure of 6%. 7 45
Page 46
Managers follow the procedures outlined in the Maximising Attendance Policy to support employees to remain at work, or to return to work after a sickness absence. There are comprehensive employee supports in place and additionally, Personnel Services work in close partnership with line managers and Resource Management Teams on a case management basis to ensure that appropriate actions are taken. 4.2. Occupational Health (Appendix 2) In terms of referrals to occupational health overall, 27 referrals were made this period. This represents an increase of 14 when compared with the same period last year. 4.3. Accident/Incident Statistics There was one accident/incident recorded within the Resource this period. 4.4. Discipline, Grievance and Dignity at Work (Appendix 2) During the period, one disciplinary hearing was heard by the resource. This represents an increase of 1 when compared with the same period last year. No grievance or Dignity at Work complaints were raised within the Resource during the period, these figures are unchanged when compared with the same period last year. 4.5. Analysis of Leavers (Appendix 2a) There were 7 leavers this period who were eligible for an exit interview. This figure has increased by 1, when compared with the same period last year. 5. Staffing Watch (Appendix 3) 5.1. There has been a decrease of 4 employees in post from 8 March 2025 to 14 June 2025. 6. Employee Implications 6.1. There are no implications for employees arising from the information presented in this report. 7. Financial Implications 7.1. All financial implications are accommodated within existing budgets. 8. Climate Change, Sustainability and Environmental Implications 8.1. There are no Climate Change, Sustainability and Environmental Implications in terms of the information contained within this report. 9. Other Implications 9.1. There are no implications for sustainability or risk in terms of the information contained within this report. 10. Integrated Impact Assessment and Consultation Requirements 10.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 10.2. There was no requirement to undertake any consultation in terms of the information contained in this report. Jackie Taylor 46
Page 47
Executive Director (Finance and Corporate Resources) 4 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective, efficient and transparent Ambitious, self-aware and improving Fair, open and sustainable Excellent employer Focused on people and their needs Working with and respecting others Previous References Finance and Corporate Resources – 11 June 2025 List of Background Papers Monitoring information provided by Finance and Corporate Resources Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Eileen McPake, HR Business Manager Ext: 4647 (Tel: 01698 454647) E-mail: Eileen.McPake@southlanarkshire.gov.uk 47
Page 48
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 3.6 2.8 3.0 April 0.0 0.0 0.0 April 3.6 2.8 3.0 April 5.1 5.2 5.7 May 3.9 3.2 2.7 May 0.0 0.0 0.0 May 3.9 3.2 2.7 May 5.1 5.3 5.6 June 4.2 3.2 2.9 June 0.0 0.0 0.0 June 4.2 3.2 2.9 June 4.7 5.2 5.4 July 3.5 3.5 July 0.0 0.0 July 3.5 3.5 July 3.8 4.1 August 3.8 2.6 August 0.0 0.0 August 3.8 2.6 August 4.1 4.7 September 3.9 3.2 September 0.0 0.0 September 3.9 3.2 September 5.3 6.1 October 3.2 3.2 October 0.0 0.0 October 3.2 3.2 October 5.1 6.0 November 3.5 4.6 November 0.0 0.0 November 3.5 4.6 November 6.2 6.9 December 3.3 4.4 December 0.0 0.0 December 3.3 4.4 December 6.6 7.0 January 2.8 3.7 January 0.0 0.0 January 2.8 3.7 January 6.1 6.7 February 3.5 3.5 February 0.0 0.0 February 3.5 3.5 February 6.4 7.0 March 2.6 3.7 March 0.0 0.0 March 2.6 3.7 March 6.3 6.8 Annual Average 3.5 3.5 3.4 Annual Average 0.0 0.0 0.0 Annual Average 3.5 3.5 3.4 Annual Average 5.4 5.9 6.0 Average Apr-Jun 3.9 3.1 2.9 Average Apr-Jun 0.0 0.0 0.0 Average Apr-Jun 3.9 3.1 2.9 Average Apr-Jun 5.0 5.2 5.6 817 0 817 15640No of Employees at 30 June 2025 Resource Total No of Employees at 30 June 2025 Appendix 1 Absence Trends - 2023/2024, 2024/2025 & 2025/2026 Finance and Corporate Resources No of Employees at 30 June 2025 No of Employees at 30 June 2025 APT&C Council WideManual Workers 48
Page 49
Apr - Jun Apr - Jun 2024 2025 MEDICAL EXAMINATIONS Number of Employees Attending EMPLOYEE COUNSELLING SERVICE Total Number of Referrals PHYSIOTHERAPY SERVICE Total Number of Referrals REFERRALS TO EMPLOYEE SUPPORT OFFICER 29 16 REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0 TOTAL 67 68 Apr - Jun Apr - Jun 2024 2025 Minor 0 1 Total Accidents/Incidents 0 1 Apr - Jun Apr - Jun 2024 2025 Total Number of Hearings 1 1 Total Number of Appeals 0 0 Appeals Pending 0 0 Time Taken to Convene Hearing October - Apr to Jun 2025 0-3 Weeks 4-6 Weeks Over 6 Weeks 1 Apr - Jun Apr - Jun 2024 2025 Number of Grievances 0 0 Apr - Jun Apr - Jun 2024 2025 Number of Incidents 0 0 RECORD OF DIGNITY AT WORK ****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the ****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7- day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures. ****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where applicable, to provide the "Total Minor" figures. RECORD OF DISCIPLINARY HEARINGS RECORD OF GRIEVANCE HEARINGS ***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not lead to injury of persons, damage to property, plant or equipment but may have done so in different Appendix 2 FINANCE AND CORPORATE RESOURCES 13 27 0 1 25 24 CAUSE OF ACCIDENTS/INCIDENTS *A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE. **Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a period of absence of absence as defined by the HSE. 49
Page 50
Apr - Jun Apr - Jun 2024 2025 Career Advancement 1 1 Child Caring / Caring Responsibilities 1 0 Disatisfaction with terms and conditions 0 0 Further Education 0 0 Moving outwith area 0 1 Personal Reasons 0 2 Poor relationship with managers / colleagues 1 0 Travelling difficulties 0 0 Other 3 3 Total Number of Leavers Eligible for Exit Interview 6 7 Number of Exit Interviews conducted 3 2 Percentage of interviews conducted 50% 29% ANALYSIS OF REASONS FOR LEAVING Appendix 2a FINANCE AND CORPORATE RESOURCES 50
Page 51
As at 14 June 2025 Total Number of Employees F/T P/T F/T P/T 182 22 368 237 Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL 8.00 88.75 335.41 210.07 55.37 23.00 0.00 0.00 0.00 720.60 As at 8 March 2025 Total Number of Employees F/T P/T F/T P/T 184 22 360 247 Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL 8.00 89.59 338.44 207.13 56.22 22.00 0.00 0.00 0.00 721.38 Appendix 3 JOINT STAFFING WATCH RETURN FINANCE AND CORPORATE RESOURCES *Full - Time Equivalent No of Employees Salary Bands 809 MALE FEMALE TOTAL *Full - Time Equivalent No of Employees Salary Bands MALE FEMALE TOTAL 813 51
Page 52
52
Page 53
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Council-wide Workforce Monitoring – 1 April to 30 June 2025 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide employment information relating to the Council for the period 1 April to 30 June 2025 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- [recs] (1) that the following employment information for the period 1 April to 30 June 2025 relating to the Council be noted:- attendance statistics occupational health accident/incident statistics discipline, grievance and Dignity at Work cases analysis of leavers and exit interviews recruitment monitoring staffing watch as at 14 June 2025 [1recs] 3. Background 3.1. As part of the Council’s performance management arrangements, regular workforce monitoring reports are submitted to the Committee. This report for the Council provides information on the position for the period 1 April to 30 June 2025. 4. Attendance Statistics 4.1. Information on absence statistics for the Council and each Resource, as analysed for June 2025, is provided in appendices 1 to 8. Points to note are:- The Council’s absence rate for June 2025, shown in Appendix 1, is 5.4% which represents a decrease of 0.2% when compared to the previous month and an increase of 0.2% when compared to June 2024. When compared to June 2024, the APT&C absence rate has increased by 0.3%, the teachers’ figure has increased by 0.1% and the manual workers’ figure has increased by 0.3%. Based on annual trends and the absence rate to June 2025, the annual average absence rate for the Council for 2025/2026 is 6%. 8 53
Page 54
In comparison to June 2024 (Appendix 8):- psychological and musculoskeletal conditions are the main reasons for absence total days lost due to psychological conditions have increased by 159 days total days lost due to musculoskeletal conditions have increased by 11 days Managers follow the procedures outlined in the Maximising Attendance Policy to support employees to remain at work, or to return to work after a sickness absence. There are comprehensive employee supports in place and additionally, Personnel Services work in close partnership with line managers and Resource Management Teams on a case management basis to ensure that appropriate actions are taken. 5. Occupational Health 5.1. Information on Occupational Health for the period 1 April to 30 June 2025 is provided in Appendix 9. during the period there were 520 employees referred for a medical examination, which is an increase of 50 when compared to the same period last year. Both musculoskeletal and psychological conditions continue to be the main reason for medical referrals a total of 466 employees attended physiotherapy treatment, showing a decrease of 86 when compared to the same period last year. Of the 466 employees referred, 73% remained at work whilst undertaking treatment during this period 423 employees were referred to the Employee Support Officer, showing a decrease of 23 when compared with the same period last year. Of the referrals made this period, 86% related to personal reasons 121 employees were referred to the PAM Assist counselling service this period, showing a decrease of 45 when compared with the same period last year. All the referrals made this period were made directly by employees. Personal reasons accounted for 14% of the referrals made, 16% were for work related reasons and 70% was for other reasons 53 employees were referred for Cognitive Behavioural Therapy this period, an increase of 49 when compared to the same period last year 6. Accidents/Incidents 6.1. The accident/incident report for 1 April to 30 June 2025 is contained in Appendix 10. the number of accidents/incidents recorded was 410 of those, 388 have been investigated and categorised 22 are still in process of being investigated of those investigated, no specified injuries were recorded of those investigated there were 386 minor accidents/incidents of those investigated there were no accidents that resulted in an absence lasting over 3 days of those investigated there were 2 accidents that resulted in an absence lasting over 7 days 7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals 7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation Referrals for 1 April to 30 June 2025 is contained in Appendices 11, 12a and 12b. During the period:- 54
Page 55
a total of 66 disciplinary hearings were held across Resources within the Council, this figure has increased by 27 when compared to the same period last year action was taken in 64 of these cases. No appeals were raised against the outcomes our target is to convene disciplinary hearings within 6 weeks, 73% of hearings met this target one appeal was received and is currently scheduled to be heard by the Appeals Panel 10 grievances were submitted, all of which are currently being investigated 5 Dignity at Work complaints were raised, all of which are currently being investigated no referrals for mediation were submitted 8. Analysis of Leavers and Exit Interviews 8.1. Information on the number of leavers and exit interviews for the period 1 April to 30 June 2025 is contained in Appendix 13. Exit interviews are conducted with employees who leave voluntarily. Labour Turnover Using information compiled from Resources and Staffing Watch information as at 14 June 2025, the Council’s turnover figure for April to June 2025 is as follows:- 113 leavers eligible for exit interviews/15,588 employees in post = Labour Turnover of 0.7%. Based on the figure at June 2025, the annual labour turnover figure for the financial year 2025/2026 for the Council is 2.9%. 8.2. Analysis of Leavers and Exit Interviews 113 employees left the Council that were eligible for an exit interview, this is a decrease of 27 when compared with the same period last year a total of 24 exit interviews were conducted which is a decrease of 19 when compared with same period last year 9. Recruitment Monitoring 9.1. Information on Recruitment Monitoring for 1 April to 30 June 2025 is contained within Appendix 14. From an analysis of Equal Opportunities Monitoring Forms, the main points to note are:- overall, 7,262 applications and 7,236 completed Equal Opportunities Monitoring Forms were received of those applicants who declared themselves as disabled (392), 222 were shortleeted for interview and 20 were appointed of those applicants of a black/ethnic minority background (660), 204 were shortleeted for interview and 17 were appointed of those applicants who are veterans (71), 12 was shortleeted for interview and 3 were appointed 10. Staffing Watch 10.1 There has been an decrease of 31 in the number of employees in post from 8 March to 14 June 2025. Details of the staffing watch are contained in Appendix 15. 55
Page 56
11. Employee Implications 11.1. There are no implications for employees arising from the information presented in this report. 12. Financial Implications 12.1. All financial implications are accommodated within existing budgets. 13. Climate Change, Sustainability and Environmental Implications 13.1. There are no climate change, sustainability or environmental implications arising from the information presented in this report. 14. Other Implications 14.1. There are no implications for risk in terms of the information contained within this report. 15. Integrated Impact Assessment and Consultation Requirements 15.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 15.2. There was no requirement to undertake any consultation in terms of the information contained in this report. Jackie Taylor Executive Director (Finance and Corporate Resources) 4 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective, efficient and transparent Fair, open and sustainable Ambitious, self-aware and improving Excellent employer Focused on people and their needs Working with and respecting others Previous References Finance and Corporate Resources Committee – 11 June 2025 List of Background Papers Monitoring information provided by Resources Contact for Further Information If you would like to inspect the background papers or want further information, please contact: - Elaine Maxwell, HR Business Manager Ext: 4647 (Tel: 01698 454647) E-mail: Elaine.Maxwell@southlanarkshire.gov.uk 56
Page 57
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 5.2 5.2 6.0 April 2.8 2.9 3.5 April 7.0 7.3 7.3 April 5.1 5.2 5.7 May 5.1 5.4 5.6 May 3.2 3.0 3.8 May 6.2 7.1 7.4 May 5.1 5.3 5.6 June 4.9 5.3 5.6 June 2.2 2.8 2.9 June 6.5 7.2 7.5 June 4.7 5.2 5.4 July 4.0 4.3 July 1.1 1.0 July 5.8 6.3 July 3.8 4.1 August 4.2 4.6 August 1.3 1.9 August 6.2 7.5 August 4.1 4.7 September 5.2 6.2 September 2.9 3.5 September 7.6 8.3 September 5.3 6.1 October 5.2 6.3 October 2.7 3.8 October 7.1 7.7 October 5.1 6.0 November 6.1 7.0 November 4.3 5.0 November 8.1 8.4 November 6.2 6.9 December 6.7 7.1 December 4.8 5.4 December 7.8 8.5 December 6.6 7.0 January 5.8 6.8 January 4.8 4.9 January 7.8 8.3 January 6.1 6.7 February 6.3 7.0 February 4.9 4.9 February 8.0 9.0 February 6.4 7.0 March 6.3 7.0 March 4.1 4.5 March 8.1 8.4 March 6.3 6.8 Annual Average 5.4 6.0 6.1 Annual Average 3.3 3.6 3.8 Annual Average 7.2 7.8 7.9 Annual Average 5.4 5.9 6.0 Average Apr-Jun 5.1 5.3 5.7 Average Apr-Jun 2.7 2.9 3.4 Average Apr-Jun 6.6 7.2 7.4 Average Apr-Jun 5.0 5.2 5.6 7234 3999 4407 15640 Appendix 1 Absence Trends - 2023/2024, 2024/2025 & 2025/2026 Council Wide APT&C Teachers No of Employees at 30 June 2025 No of Employees at 30 June 2025 Manual Workers Council Wide No of Employees at 30 June 2025 No of Employees at 30 June 2025 57
Page 58
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7 May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6 June 4.3 4.1 3.6 June 5.9 6.4 7.4 June 5.7 6.0 6.8 June 4.7 5.2 5.4 July 2.3 3.8 July 4.6 4.5 July 4.3 4.4 July 3.8 4.1 August 3.0 3.4 August 5.2 6.2 August 4.9 5.7 August 4.1 4.7 September 2.5 3.8 September 7.1 7.5 September 6.4 6.9 September 5.3 6.1 October 2.0 4.2 October 7.0 7.2 October 6.3 6.7 October 5.1 6.0 November 2.6 3.6 November 8.1 8.3 November 7.3 7.6 November 6.2 6.9 December 3.0 3.8 December 7.5 8.1 December 6.8 7.4 December 6.6 7.0 January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7 February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0 March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8 Annual Average 3.2 3.7 3.6 Annual Average 6.8 7.2 7.4 Annual Average 6.2 6.6 6.8 Annual Average 5.4 5.9 6.0 Average Apr-Jun 3.9 3.5 3.2 Average Apr-Jun 6.2 6.5 7.3 Average Apr-Jun 5.9 6.1 6.7 Average Apr-Jun 5.0 5.2 5.6 578 2853 3431 15640 Resource Total No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 Appendix 2 Absence Trends - 2023/2024, 2024/2025 & 2025/2026 Community and Enterprise Resources APT&C Council WideManual Workers 58
Page 59
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 5.0 5.4 6.8 April 2.8 2.9 3.5 April 3.8 4.0 4.9 April 5.1 5.2 5.7 May 5.4 6.0 6.6 May 3.2 3.0 3.8 May 4.2 4.4 5.0 May 5.1 5.3 5.6 June 4.8 5.5 6.3 June 2.2 2.8 2.9 June 3.4 4.1 4.4 June 4.7 5.2 5.4 July 3.4 3.2 July 1.1 1.0 July 2.2 2.0 July 3.8 4.1 August 4.0 3.9 August 1.3 1.9 August 2.5 2.8 August 4.1 4.7 September 5.9 6.6 September 2.9 3.5 September 4.3 4.9 September 5.3 6.1 October 5.5 6.5 October 2.7 3.8 October 4.0 5.0 October 5.1 6.0 November 7.1 7.8 November 4.3 5.0 November 5.6 6.2 November 6.2 6.9 December 8.1 8.6 December 4.8 5.4 December 6.3 6.8 December 6.6 7.0 January 6.6 8.0 January 4.8 4.9 January 5.6 6.3 January 6.1 6.7 February 7.2 8.4 February 4.9 4.9 February 6.0 6.5 February 6.4 7.0 March 7.5 8.3 March 4.1 4.5 March 5.7 6.2 March 6.3 6.8 Annual Average 5.9 6.5 6.8 Annual Average 3.3 3.6 3.8 Annual Average 4.5 4.9 5.1 Annual Average 5.4 5.9 6.0 Average Apr-Jun 5.1 5.6 6.6 Average Apr-Jun 2.7 2.9 3.4 Average Apr-Jun 3.8 4.2 4.8 Average Apr-Jun 5.0 5.2 5.6 3203 3999 7202 15640 Teachers Resource Total No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 Appendix 3 Absence Trends - 2023/2024, 2024/2025 & 2025/2026 Education Resources Council WideAPT&C 59
Page 60
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 3.6 2.8 3.0 April 0.0 0.0 0.0 April 3.6 2.8 3.0 April 5.1 5.2 5.7 May 3.9 3.2 2.7 May 0.0 0.0 0.0 May 3.9 3.2 2.7 May 5.1 5.3 5.6 June 4.2 3.2 2.9 June 0.0 0.0 0.0 June 4.2 3.2 2.9 June 4.7 5.2 5.4 July 3.5 3.5 July 0.0 0.0 July 3.5 3.5 July 3.8 4.1 August 3.8 2.6 August 0.0 0.0 August 3.8 2.6 August 4.1 4.7 September 3.9 3.2 September 0.0 0.0 September 3.9 3.2 September 5.3 6.1 October 3.2 3.2 October 0.0 0.0 October 3.2 3.2 October 5.1 6.0 November 3.5 4.6 November 0.0 0.0 November 3.5 4.6 November 6.2 6.9 December 3.3 4.4 December 0.0 0.0 December 3.3 4.4 December 6.6 7.0 January 2.8 3.7 January 0.0 0.0 January 2.8 3.7 January 6.1 6.7 February 3.5 3.5 February 0.0 0.0 February 3.5 3.5 February 6.4 7.0 March 2.6 3.7 March 0.0 0.0 March 2.6 3.7 March 6.3 6.8 Annual Average 3.5 3.5 3.4 Annual Average 0.0 0.0 0.0 Annual Average 3.5 3.5 3.4 Annual Average 5.4 5.9 6.0 Average Apr-Jun 3.9 3.1 2.9 Average Apr-Jun 0.0 0.0 0.0 Average Apr-Jun 3.9 3.1 2.9 Average Apr-Jun 5.0 5.2 5.6 817 0 817 15640 Resource Total No of Employees at 30 June 2025 Appendix 4 Absence Trends - 2023/2024, 2024/2025 & 2025/2026 Finance and Corporate Resources No of Employees at 30 June 2025 No of Employees at 30 June 2025 APT&C Council WideManual Workers No of Employees at 30 June 2025 60
Page 61
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 5.7 5.3 5.6 April 6.9 7.2 4.8 April 6.2 6.1 5.3 April 5.1 5.2 5.7 May 4.9 5.2 4.5 May 6.1 8.1 5.7 May 5.4 6.4 5.0 May 5.1 5.3 5.6 June 5.4 5.7 5.1 June 6.8 8.4 6.0 June 6.0 6.8 5.5 June 4.7 5.2 5.4 July 5.0 5.3 July 8.1 8.6 July 6.2 6.7 July 3.8 4.1 August 5.1 5.5 August 8.5 8.8 August 6.4 6.9 August 4.1 4.7 September 4.7 7.5 September 7.8 7.4 September 6.0 7.5 September 5.3 6.1 October 4.9 7.3 October 5.2 6.0 October 5.0 6.8 October 5.1 6.0 November 4.8 6.8 November 6.7 6.2 November 5.6 6.5 November 6.2 6.9 December 5.1 6.4 December 7.4 5.8 December 6.0 6.2 December 6.6 7.0 January 4.4 7.0 January 6.0 6.2 January 5.0 6.7 January 6.1 6.7 February 5.2 7.0 February 6.3 7.1 February 5.6 7.0 February 6.4 7.0 March 5.3 6.8 March 7.2 5.9 March 6.1 6.4 March 6.3 6.8 Annual Average 5.0 6.3 6.2 Annual Average 6.9 7.1 6.5 Annual Average 5.8 6.7 6.4 Annual Average 5.4 5.9 6.0 Average Apr-Jun 5.3 5.4 5.1 Average Apr-Jun 6.6 7.9 5.5 Average Apr-Jun 5.9 6.4 5.3 Average Apr-Jun 5.0 5.2 5.6 856 538 1394 15640 Manual Workers Council Wide No of Employees at 30 June 2025No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 Appendix 5 Housing & Technical Resources Resource Total Absence Trends - 2023/2024, 2024/2025 & 2025/2026 APT&C 61
Page 62
2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 2023 / 2024 2024 / 2025 2025 / 2026 % % % % % % % % % % % % April 6.5 6.5 7.0 April 9.4 8.8 9.4 April 7.4 7.3 7.8 April 5.1 5.2 5.7 May 5.8 5.8 6.6 May 8.4 9.5 8.6 May 6.6 7.0 7.2 May 5.1 5.3 5.6 June 5.5 6.0 6.6 June 8.6 9.2 8.7 June 6.5 7.0 7.3 June 4.7 5.2 5.4 July 5.4 6.5 July 8.8 11.2 July 6.5 8.0 July 3.8 4.1 August 4.8 6.9 August 8.6 11.4 August 6.0 8.4 August 4.1 4.7 September 5.6 7.2 September 9.3 12.0 September 6.8 8.8 September 5.3 6.1 October 6.5 7.5 October 8.5 11.0 October 7.1 8.6 October 5.1 6.0 November 7.3 8.1 November 9.0 10.0 November 7.8 8.7 November 6.2 6.9 December 7.4 7.0 December 9.5 11.6 December 8.1 8.5 December 6.6 7.0 January 7.0 6.7 January 10.3 11.3 January 8.1 8.2 January 6.1 6.7 February 7.0 7.0 February 9.9 11.6 February 7.9 8.5 February 6.4 7.0 March 7.1 7.5 March 9.4 10.7 March 7.9 8.6 March 6.3 6.8 Annual Average 6.3 6.9 7.1 Annual Average 9.1 10.7 10.6 Annual Average 7.2 8.1 8.2 Annual Average 5.4 5.9 6.0 Average Apr-Jun 5.9 6.1 6.7 Average Apr-Jun 8.8 9.2 8.9 Average Apr-Jun 6.8 7.1 7.4 Average Apr-Jun 5.0 5.2 5.6 1780 1016 2796 15640 Resource TotalManual Workers No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 No of Employees at 30 June 2025 Appendix 6 Absence Trends - 2023/2024, 2024/2025 & 2025/2026 Social Work Resources APT&C Council Wide 62
Page 63
Appendix 7 Absence by long and short term From: 1 April to 30 June 2025 Community and Enterprise 3431 1.7 4.9 6.6 2.1 4.5 6.6 1.9 4.9 6.8 Education 7202 0.8 4.1 4.9 1.6 3.4 5.0 1.3 3.1 4.4 Finance and Corporate 817 1.1 1.9 3.0 1.0 1.7 2.7 1.0 1.9 2.9 Housing & Technical 1394 1.3 4.0 5.3 2.1 2.9 5.0 1.9 3.6 5.5 Social Work 2796 2.4 5.4 7.8 2.1 5.1 7.2 2.2 5.1 7.3 Council Overall for April to June 2025 15640 1.3 4.4 5.7 1.8 3.8 5.6 1.6 3.8 5.4 Resource No of employees Resource Total Absence % April 2025 Total Short Term % Total Long Term % May 2025 Total Short Term % Total Long Term % Resource Total Absence % June 2025 Total Short Term % Total Long Term % Resource Total Absence % 63
Page 64
From : 1 June 2025 - 30 June 2025 Total WDL % Total WDL % Total WDL % Total WDL % Total WDL % Musculoskeletal 1401 30 952 16 58 14 392 28 616 18 3419 22 Psychological 1243 27 2184 38 207 49 505 36 1251 37 5390 35 Stomach, Bowel, Blood, Metabolic Disorders 479 10 867 15 59 14 215 15 331 10 1951 12 Respiratory 357 8 476 8 37 9 81 6 373 11 1324 8 Other Classification 1142 25 1324 23 64 15 206 15 776 23 3512 23 Total Days Lost By Resource 4622 100 5803 100 425 100 1399 100 3347 100 15596 100 Total Work Days Available From : 1 June 2024 - 30 June 2024 Total WDL % Total WDL % Total WDL % Total WDL % Total WDL % Musculoskeletal 1336 33 904 16 48 10 348 19 772 21 3408 22 Psychological 1038 25 1926 34 192 40 737 40 1338 36 5231 33 Stomach, Bowel, Blood, Metabolic Disorders 480 12 628 11 41 9 224 12 439 12 1812 11 Respiratory 348 8 857 15 74 16 172 9 351 9 1802 11 Other Classification 902 22 1392 24 121 25 364 20 864 23 3643 23 Total Days Lost By Resource 4104 100 5707 100 476 100 1845 100 3764 100 15896 100 Total Work Days Available *WDL = Work Days Lost 68051 132974 14681 Social Work Resources 53548270981495814076768500 Percentage Housing and Technical Resources Education Resources PercentageTotal WDL By ReasonREASONS Community and Enterprise Resources Education Resources Finance and Corporate Housing and Technical Resources Finance and Corporate 25615 45896 Appendix 8 Attendance Monitoring Absence Classification Reasons Community and Enterprise Resources Social Work Resources Total WDL By Reason 64
Page 65
Appendix 9 Teachers Others 133 47 74 27 81 158 102 57 101 13 64 133 Apr-Jun 2024 Apr-Jun 2025 Apr-Jun 2024 Apr-Jun 2025 130 117 Community and Enterprise 1 5 109 63 1 10 100 91 0 0 25 24 0 0 63 51 0 4 125 120 2 34 552 466 4 53 Reason Apr-Jun 2024 Apr-Jun 2025 Apr-Jun 2024 Apr-Jun 2025 Work Stress 12 19 91 98 Addicition 0 1 173 161 Personal 141 17 29 16 Anxiety/Depression 0 72 34 46 Bereavement 13 12 119 102 Total 166 121 446 423 Community and Enterprise Resource No of Employees Referred To Employee Support Officer No of Employees Referred For Cognitive Behavioural Therapy Resource Finance and Corporate Education Housing and Technical Occupational Health Reports From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024 Medical Referrals Community and Enterprise Education Finance and Corporate Housing & Technical Social Work Totals Total (Apr-Jun 2025) 520 Total (Apr-Jun 2024) 470 No of Employees Referred For Physiotherapy Resource Community and Enterprise Education (Teachers) Education (Others) Finance and Corporate Housing and Technical Social Workk Total Analysis of Counselling Referrals by Cause Not Disclosed Education Finance and Corporate Housing and Technical Social Work Social Work Total Total 65
Page 66
2024 2025 2024 2025 2024 2025 2024 2025 2024 2025 2024 2025 Specified Injury 0 0 0 0 0 0 0 0 0 0 0 0 Specified Injury (Violence) 0 0 0 0 0 0 0 0 0 0 0 0 Total Specified Injury* 0 0 0 0 0 0 0 0 0 0 0 0 Over 7 Day 8 1 2 0 0 0 1 1 1 0 12 2 Over 7 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0 Total Over 7 Day** 8 1 2 0 0 0 1 1 1 0 12 2 Over 3 Day 1 0 3 0 0 0 0 0 1 0 5 0 Over 3 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0 Total Over 3 Day** 1 0 3 0 0 0 0 0 1 0 5 0 Minor Injury 38 15 57 33 0 1 6 4 23 20 124 73 Near Miss 0 5 6 17 0 0 0 1 4 4 10 27 Violence (Physical) 6 14 346 221 0 0 0 0 12 5 364 240 Violence (Verbal) 5 3 42 34 0 0 2 4 12 5 61 46 Total Minor*** 49 37 451 305 0 1 8 9 51 34 559 386 Total Finalised 58 38 456 305 0 1 9 10 53 34 576 388 Accident 1 3 9 4 0 0 0 0 0 0 10 7 Incident 0 0 4 3 0 0 0 0 1 0 5 3 Violence (Physical) 0 0 12 9 0 0 0 0 0 0 12 9 Violence (Verbal) 0 0 4 0 0 0 0 3 0 0 4 3 Near Miss 0 0 0 0 0 0 0 0 0 0 0 0 Total to be investigated**** 1 3 29 16 0 0 0 3 1 0 31 22 Total Events/Month 59 41 485 321 0 1 9 13 54 34 607 410 **Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury) ***A minor injury is an injury not covered by Over 7 day, Over 3 day or Specified ****In process relates to records not yet investigated/defined by managers *Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE Appendix 10 Analysis of Accidents / Incidents From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024 Accidents by Month of Occurrence Community and Enterprise Education Finance and Corporate Housing & Tech Social Work TOTAL 66
Page 67
APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total Community and Enterprise 1 32 N/A 33 0 0 N/A 0 1 32 N/A 33 11 14 8 52% 33.52 Education 4 N/A 4 8 0 0 0 0 4 0 4 8 1 2 5 6% 8 Finance and Corporate 1 0 N/A 1 0 0 N/A 0 1 0 N/A 1 1 0 0 2% 1 Housing and Technical 5 5 N/A 10 0 2 N/A 2 5 3 N/A 8 3 4 3 15% 10 Social Work 1 13 N/A 14 0 0 N/A 0 1 13 N/A 14 7 5 2 25% 14 Total (Apr-Jun 2025) 12 50 4 66 0 2 0 2 12 48 4 64 23 25 18 73% 66 Total (Apr-Jun 2024) 7 29 3 39 3 5 0 8 5 23 3 31 24 10 5 87% APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total Community and Enterprise 0 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 Education 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 0 N/A 0 0 0 Finance and Corporate 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0 Housing and Technical 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0 Social Work 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 Total (Apr-Jun 2025) 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0 Total (Apr-Jun 2024) 0 N/A 0 0 0 0 N/A 0 0 0 0 0 0 0 N/A 0 0 *Resources nil responses are not included in figures Appeal's Panel From: 1 April - 30 June 2025 Appeal's Panel Total Appendix 11 Record of Disciplinary Hearings From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024 Resource No of Disciplinary Hearings Outcome of Disciplinary Hearings No of weeks to convene Disciplinary Hearing % Held within 6 Weeks APT&C Manual/ Craft 6+Teachers Total No Action Action Taken 3 Appeals PendingAPT&C Manual/ Craft Teachers Total Upheld 4-6 Upheld in Part Not Upheld Upheld Upheld in Part Not Upheld Total Withdrawn Appeals pending to date Resource No of Appeals Outcome of Appeals 10 0 0 0 67
Page 68
Appendix 12a Record of Grievances From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024 Grievances No of Grievances No Resolved at Stage 1 No Resolved at Stage 2 No Resolved at Stage 3 Still in Process Total (Apr-Jun 2025) 10 0 0 0 10 Total (Apr-Jun 2024) 0 0 0 0 0 Dignity at Work From: 1 April 2025 - 30 June 2025 comparison with 1 April 2024 - 30 June 2024 Dignity at Work No of Incidents No Resolved at Informal Stage No Resolved at Formal Stage No of Appeals Appeals in Process Still in Process Total (Apr-Jun 2025) 5 0 0 0 0 5 Total (Apr-Jun 2024) 0 0 0 0 0 0 68
Page 69
Appendix 13 From 1 April - 30 June 2025 Reason for leaving Community and Enterprise Education Finance and Corporate Housing & Technical Social Work Total % Career Advancement 3 11 1 4 10 29 26% Child Caring / Caring Responsibilities 4 3 0 0 1 8 7% Disatisfaction with terms and conditions 1 1 0 1 0 3 3% Further Education 2 1 0 0 2 5 4% Moving outwith area 2 0 1 0 2 5 4% Personal Reasons 9 14 2 5 7 37 33% Poor relationship with managers / colleagues 4 2 0 0 1 7 6% Other 8 5 3 0 3 19 17% Total no. of leavers per Resource eligible for an exit interview 33 37 7 10 26 113 100% Number of exit interviews conducted 6 10 2 2 4 24 % of leavers interviewed 18% 27% 29% 20% 15% 21% From 1 April - 30 June 2024 Total no. of leavers per Resource eligible for an exit interview 39 54 6 11 30 140 Number of exit interviews conducted 6 23 3 4 7 43 % of leavers interviewed 15% 43% 50% 36% 23% 31% * Note these totals include temporary employees Analysis of leavers and exit interviews 69
Page 70
Appendix 14 Applied Interviewed Appointed % of Applicants interviewed % of Applicants appointed % of Interviewees appointed 5197 2509 292 48% 6% 12% 1951 1067 90 55% 5% 8% 3239 1371 199 42% 6% 15% 392 222 20 57% 5% 9% 4222 1982 226 47% 5% 11% 718 409 59 57% 8% 14% 660 204 17 31% 3% 8% 844 287 27 34% 3% 9% 4146 2116 257 51% 6% 12% 71 12 3 17% 4% 25% Applied Interviewed Appointed % of Applicants interviewed % of Applicants appointed % of Interviewees appointed 2854 899 281 31% 10% 31% 1043 333 102 32% 10% 31% 1797 560 177 31% 10% 32% 115 47 5 41% 4% 11% 2142 595 183 28% 9% 31% 674 285 93 42% 14% 33% 2312 809 266 35% 12% 33% 369 65 12 18% 3% 18% 12 5 0 42% 0% 0% Recruitment Monitoring Analysis of Gender, Disability, Ethnicity and Age From : 1 April - 30 June 2025 Total Number of applications received: 7262 Total Number of Equal Opportunities Monitoring forms received: 7236 Total Number of posts advertised: 269 Total Number of appointments: 425 Gender / Disability / Age ** includes White Scottish and White Other British Total EO Forms Received Total No of Male Applicants Total No of Female Applicants Total No of Disabled Applicants Total No of applicants aged under 50 Total No of applicants aged over 50 Total No of BME applicants Total No of Minority Ethnic applicants* Total No of White applicants** Total No of Veteran applicants *includes Mixed, Asian, Black, White (Irish, Polish, Gypsy/Traveller, Roma, Showman/Showwoman, other Total No of Female Applicants From : 1 April - 30 June 2024 Total Number of applications received: 6128 Total Number of Equal Opportunities Monitoring forms received: 3523 Total Number of posts advertised: 2862 Total Number of appointments: 581 Gender / Disability / Age Total EO Forms Received Total No of Male Applicants *Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds. Total No of Disabled Applicants Total No of applicants aged under 50 Total No of applicants aged over 50 Total No of White applicants Total No of Black/Ethnic minority applicants* Total No of Veteran applicants 70
Page 71
Appendix 15 Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher Community & Enterprise Resources 3387 1246 351 238 1552 2446.47 5.00 1697.99 413.49 264.45 45.94 17.60 0.00 2.00 0.00 Education - Others 3164 95 88 554 2427 2433.87 6.00 1181.26 1054.95 130.70 49.00 11.00 0.00 0.96 0.00 Education - Teachers 4122 700 117 2127 1178 3527.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3527.90 Finance & Corporate Resources 809 182 22 368 237 720.60 8.00 88.75 335.41 210.07 55.37 23.00 0.00 0.00 0.00 Housing & Technical 1367 751 113 344 159 1260.51 4.00 195.51 668.67 350.04 33.29 7.00 0.00 2.00 0.00 Social Work Resources 2739 191 230 923 1395 2347.99 3.00 319.33 1436.10 465.66 91.30 31.60 0.00 1.00 0.00 9209.44 (excluding Teachers) Total All Staff 15588 3165 921 4554 6948 12737.34 26.00 3482.84 3908.62 1420.92 274.90 90.20 0.00 5.96 3527.90 Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher Community & Enterprise Resources 3351 1198 365 239 1549 2404.42 5.00 1650.91 410.60 269.67 47.94 18.30 0.00 2.00 0.00 Education - Others 3169 97 94 551 2427 2438.90 5.00 1172.94 1063.60 136.40 48.00 11.00 0.00 1.96 0.00 Education - Teachers 4154 705 127 2140 1182 3544.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3544.20 Finance & Corporate Resources 813 184 22 360 247 721.38 8.00 89.59 338.44 207.13 56.22 22.00 0.00 0.00 0.00 Housing & Technical 1373 760 115 337 161 1266.27 3.00 188.00 676.43 354.95 32.89 9.00 0.00 2.00 0.00 Social Work Resources 2759 189 232 927 1411 2364.87 3.00 320.84 1449.61 472.02 84.80 33.60 0.00 1.00 0.00 9195.84 (excluding Teachers) Total All Staff 15619 3133 955 4554 6977 12740.04 24.00 3422.28 3938.68 1440.17 269.85 93.90 0.00 6.96 3544.20 Quarterly Joint Staffing Watch Return : Number Employed On 14 June 2025 Analysis by Resource Total Number of Employees Full-Time Equivalent Male Female Salary Band Quarterly Joint Staffing Watch Return : Number Employed On 8 March 2025 Analysis by Resource Total Number of Employees Full-Time Equivalent Male Female Salary Band 71
Page 72
72
Page 73
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Treasury Management Activity – 2025/2026 First Quarter Review 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide a first quarter review of Treasury Management Activity for 2025/2026 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- [recs] (1) that the contents of this report be noted. [1recs] 3. Background 3.1 In order to provide members with information on the Council’s Treasury Management activities, a quarterly report is presented to this Committee. This report covers the period 1 April to 30 June 2025. 4. Market Performance 4.1. At the time of writing the base rate was 4.00% and the Bank of England Asset Purchase Programme (commonly referred to as its policy of quantitative easing) was £586bn. The Council’s Treasury Management Advisers are forecasting that the base rate is likely to be cut to 3.75% in February 2026. 5. Debt Management and Borrowing Strategy 5.1. The Council began the year with debt of £1,030.762m with fixed rate loans from the Public Works Loans Board (PWLB) making up 94.32% of the debt. 5.2. Table 1 shows the movement in borrowing from 1 April 2025 to 30 June 2025. Short term borrowing reflects borrowing which will mature in the coming year, or where the debt can be recalled in the coming year. 9 73
Page 74
Table 1 – Movement in Borrowing to 30 June 2025 Balance as at 01/04/2025 £m New Borrowing £m Debt Maturing £m Debt Repaid £m Balance as at 30/06/25 £m Increase/ Decrease in Borrowing £m Short Term Borrowing 170.153 87.500 (126.216) 0.00 131.437 (38.716) Long Term Borrowing 860.609 0.000 0.00 0.00 860.609 0.000 Total Borrowing 1,030.762 87.500 (126.216) 0.00 992.046 (38.716) 5.3. In 2012/2013, HM Treasury introduced a “certainty rate” to enable eligible local authorities to access cheaper PWLB funding, with a 20 basis point (0.20%) reduction on the standard rate. South Lanarkshire Council has access to this reduced rate. 5.4. The Council has an expected borrowing requirement of £400.567m for 2025/2026 including £237.667m carried over from 2024/2025. It is expected that only £232.325m of borrowing will actually need to be taken in 2025/2026. 5.5. The Executive Director (Finance and Corporate Resources), under delegated powers, will continue to take the most appropriate form of borrowing depending on the prevailing interest rates at the time, taking into consideration the differential between investment earnings and debt costs that remains high. 5.6. No long-term borrowing has been taken so far in the current financial year. Instead, cash balances have been used to fund capital spend. Borrowing to replace these balances will be required going forward. 5.7. Short-term borrowing of £87.500m has been taken during 2025/2026 for cashflow purposes. This borrowing has been taken from other public bodies such as local authorities and police/fire boards; and local government pension funds. 6. Investment Activity 6.1. On a daily basis, the Treasury Management section within Finance and Corporate Resources manages the Council’s cash balances. These balances can result from day-to-day cash flow situations where income has been received before expenditure has taken place, and from the balances held in earmarked reserves for use at a later date. It is the responsibility of the section to manage these funds. The primary consideration when making deposits is the security of funds. Secondary to this, consideration is given to ensuring we have access to funds when necessary, and that these funds are working as well as they can for the Council. 6.2. The Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy Report for 2025/2026 was approved by South Lanarkshire Council on 26 February 2025. This included details of permitted investments for the Council. 6.3. Prior to depositing funds with any bank or building society, checks are made with the Council’s treasury adviser, MUFG, that the institution is considered safe and that any deposit conforms to their recommended time duration as determined by their Rating Methodology. This methodology uses credit ratings, rating watches and outlooks and credit default swap (CDS) prices to establish a suggested time duration for deposits. 74
Page 75
6.4. Deposits made in the period 1 April 2025 to 30 June 2025 totalled £543.770m. This is the cumulative deposits placed over this period. This is broken down per sector and institution in Table 3. 95.32% of these deposits were made with the UK Government through the Debt Management Office (DMO) deposit facility. 6.5. In order to manage their cash flow over the short term, local authorities, as part of normal treasury management activity, will place money on deposit with other local authorities. Deposits placed with other local authorities account for 2.76% of deposits. The remaining 1.92% was placed in instant access call accounts with Bank of Scotland. Table 3 – Investment Activity 1 April 2025 to 30 June 2025 Counterparty Deposit Totals (£m) % of Total Deposits Average Interest Rate Deposits in UK Government Debt Management Account Deposit Facility 518.335 95.32% 4.32% Total Deposits in UK Government 518.335 95.32% 4.32% Deposits in UK Local Authorities 15.000 2.76% 4.25% Deposits in UK Banks and Building Societies: Bank of Scotland 10.435 1.92% 4.34% Total Deposits in UK Banks and Building Societies 10.435 1.92% 4.34% Total Deposits 01/04/2025 to 30/06/2025 543.770 100.00% 4.31% 6.6. The average interest rates achieved from the deposits are also shown in Table 3. Interest rates achievable for deposits have been falling since the Bank of England began a series of interest rate cuts.. 6.7. Actual deposits as at 30 June 2025 totalled £84.662m. 7. Management of Risk 7.1. It is recognised that no Treasury Management activity is without risk and practices are put in place in order to limit risk. As noted in section 6.2, the Treasury Management Strategy was approved in February 2025 and set a framework for Treasury Management activities in 2025/2026. It also set limits on debt and investments in order to mitigate risks. 7.2. The Annual Investment Strategy for 2025/2026, also approved in February 2025, included details on how risk would be managed for all permitted investments. This included criteria for placing deposits with the Debt Management Office (DMO), UK Local Authorities, Banks and Building Societies and Money Market Funds. 7.3. Part of the criteria for counterparties is meeting minimum credit ratings with the three main rating agencies. A credit rating evaluates the credit worthiness of an organisation. It is an evaluation made by a credit rating agency of the organisation’s ability to pay back the debt and the likelihood of default. 75
Page 76
7.4. Tables 4 to 6 show a breakdown of deposits with details of the credit ratings of banks and building societies used from 1 April 2025 to 30 June 2025. Deposits with the DMO are with the UK Government and so have a rating equivalent to the UK’s sovereign rating. Deposits with local authorities are considered to be of very high credit quality. Table 4 – Fitch Ratings Long Term Rating Short Term Rating Deposits Totals Percentage of Total Deposits Deposits with DMO / UK Government (AA-) 518.335m 95.32% Deposits with Local Authorities 15.000m 1.92% AA- F1+ 10.435m 2.76% Total 543.770m 100.00% Table 5 – Moody’s Ratings Long Term Rating Short Term Rating Deposits Totals Percentage of Total Deposits Deposits with DMO / UK Government (Aa3) 518.335m 95.32% Deposits with Local Authorities 15.000m 1.92% A1 P-1 10.435m 2.76% Total 543.770m 100.00% Table 6 – Standard and Poor’s Ratings Long Term Rating Short Term Rating Deposits Totals Percentage of Total Deposits Deposits with DMO / UK Government (AA) 518.335m 95.32% Deposits with Local Authorities 15.000m 1.92% A+ A-1 10.435m 2.76% Total 543.770m 100.00% 7.5. The tables above show that 97.24% of deposits were made with counterparties of very high credit quality (DMO / UK Government and other local authorities). The remaining 2.76% were deposits in instant access accounts with Bank of Scotland. 7.6. The graph at Appendix 1 shows the duration of deposits made from 1 April 2025 to 30 June 2025. The graph shows that, since 1 April 2025, all deposits have been made for 1 year or less. The maximum maturity period of 61 days was for a deposit of £15.000m to a local authority. 8. Next Quarter Investment Plans 8.1. The current investment framework will be continued in the next quarter. Deposits will continue to be placed with the institutions where their ratings are consistent with the Council’s approved criteria. Deposits will also continue to be placed with the DMO and UK local authorities. 8.2. Treasury Bills will be used when they return a higher yield than deposits in the DMO for the same, very low risk. 8.3. We will continue to work with our Treasury Management Advisers, Link, to ensure we gain all information available on counterparties before any deposits are made. 76
Page 77
9. Treasury Management Indicators 9.1. The purpose of these indicators is to contain the activity of the treasury function within certain limits, thereby managing risk and reducing the impact of an adverse movement in interest rates. However, if these are set to restrictive limits, they will impair the opportunities to reduce costs/improve performance. The indicators are detailed in paragraphs 9.2 to 9.5. 9.2. Limits for External Debt: The operational and authorised limits for external debt for 2025/2026 were set in the Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy 2025/2026 approved by South Lanarkshire Council on 26 February 2025. These are shown in Table 7, along with a column showing the difference between the actual debt level and the limits (headroom). Table 7 – Limits for External Debt Estimate as per 2025/26 Strategy Minimum Headroom to Limits in period Headroom as at 30/06/2026 £m £m £m Operational Limit for external debt 1,570.000 451.738 577.954 Authorised Limit for external debt 1.590,000 471.738 597.954 9.3. The indicator shows that we have not breached the operational and authorised limits to 30 June 2025. There has been a minimum level of headroom of £451.738m between actual and authorised level for external debt in the period to 30 June 2025. The headroom at the end of June was £597.954m for external debt. 9.4. Limits on Maturity Structure: By setting limits on the maturity structure of borrowing, the exposure to large concentrations of debt needing to be replaced at the same time in the future at currently unknown rates can be limited. This effectively places a limit on exposure to longer term interest rate movement. This is shown in Table 8. Table 8 – Limits on Maturity Structure Maturity Structure of Borrowing Upper Limit Lower Limit Maximum for period to 30/06/25 Actuals as at 30/06/25 Under 12 months 50% 0% 23.04% 13.25% 12 months and 24 months 50% 0% 7.07% 7.07% 24 months and 5 years 50% 0% 21.52% 21.52% 5 years and 10 years 55% 0% 20.50% 20.50% 10 years and 20 years 60% 0% 3.31% 3.31% 20 years and 30 years 70% 0% 24.34% 24.34% 30 years and 40 years 80% 0% 10.01% 10.01% 40 years and 50 years 90% 0% 0.00% 0.00% 50 years and above 100% 0% 0.00% 0.00% 9.5. The indicator shows that the upper limits for all maturity profiles have not been breached to 30 June 2025. 10. Employee Implications 10.1. There are no employee implications. 77
Page 78
11. Financial Implications 11.1. The current rate of interest receivable remains relatively low but has increased over recent months. Any deposit interest received offsets Loan Charges made to the Council’s Revenue budget. 11.2. The costs of borrowing for capital expenditure have been built into the long-term Revenue Budget Strategy. 12. Climate Change, Sustainability and Environmental Implications 12.1. There are no implications for climate change or sustainability in terms of the information contained in this report. 12.2. There is also no requirement to carry out an environmental impact assessment in terms of the information contained within this report. 13. Other Implications (Including Environmental and Risk Issues) 13.1. Section 7 of this report provides details of how investment risk is managed. 14. Integrated Impact Assessment and Consultation Requirements 14.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 14.2. There is no requirement to carry out any consultation in terms of the information provided in this report. Jackie Taylor Executive Director (Finance and Corporate Resources) 13 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective, efficient and transparent Previous References Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy 2025/2026, South Lanarkshire Council, 07 February 2025. List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Lorraine O’Hagan, Head of Finance Ext: 2601 (Tel: 01698 452601) E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 78
Page 79
0 10 20 30 40 50 60 70 80 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 61 Call £m Term (Days) Maturity of Deposits 1st April 2025 - 30th June 2025 Appendix 1 79
Page 80
80
Page 81
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Finance and Corporate Resources' Workforce Plan 2025 to 2027 1. Purpose of Report 1.1. The purpose of the report is to:- provide an update on the Finance and Corporate Workforce Plan 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- (1) that the work to produce the Finance and Corporate Resources’ Workforce Plan be noted; and (2) that the Finance and Corporate Resources’ Workforce Plan 2025 to 2027, attached at Appendix 1, be approved. 3. Background 3.1. South Lanarkshire Council is committed to delivering high-quality services that improve the lives of residents across the region. The Council Plan 2022 to 2027 outlines strategic priorities under the themes of People, Planet, and Progress. To support these priorities, the Council has developed a Workforce Strategy that ensures the right people are in the right roles at the right time. 3.2. The Council Workforce Strategy and Planning process provides the framework for workforce planning in the Council. The Strategy and Plans are aligned to current and future Council service needs and details the approach by the Council to ensure that the workforce required is in place to meet those needs. The Council Workforce Strategy and Plan was approved at the Executive Committee, 28 May 2025. 3.3. Resource workforce plans detail the key areas of focus for Resources for 2025 to 2027, the current resource workforce profiles, the key workforce challenges and actions identified to address challenges. 4. Workforce Planning Process 4.1. Engagement and consultation to produce workforce plans has been primarily through HR business managers and Resource Management Teams. Resources undertook a horizon scanning exercise as part of the Resource planning process to identify key areas of focus, this along with workforce data was used to complete workforce planning toolkit templates. In addition, there was a review of previous actions (2022 to 2025) to identify any ongoing activity to be reflected in the 2025 to 2027 plans. This 10 81
Page 82
structured approach enabled the identification of strategic workforce priorities and the development of targeted actions to address them. 5. Finance and Corporate Resources Workforce Plan 2025 to 2027. 5.1. The Finance and Corporate Resource Workforce Plan is attached in Appendix 1. The workforce planning process identified 5 key priority areas, each with associated challenges and actions detailed in paragraphs 5.2 to 5.6. 5.2. Recruitment, Attraction, and Retention The challenges identified were that in some services there is an ageing workforce, which will mean a loss of skills and expertise. There has also been difficulty in recruiting and retaining staff for specialist roles in procurement, IT and finance, due to a competitive recruitment market. To address this, services will continue to use a ‘grow your own approach’ to develop employees into more specialist roles, this has been successful in procurement in the last workforce planning cycle. This approach will include succession planning to develop future leaders, expansion of graduate recruitment and career pathways, as well as promotion of the Council as an employer of choice. 5.3. Transformation Across the Resource, services advised that on an annual basis they will be carrying service reviews as appropriate and contributing to the budget gap through efficiencies. It can be challenging to balance maintaining or improving services and managing programmes of transformation and change. The services will continue to review capacity and look at staffing requirements along with the outcomes to transformation reviews and changes in demand for services. IT services will progress the Digital Transformation Review and this will contribute to cross council transformation reviews. The Resource will also continue to manage efficiencies as Oracle Fusion is embedded. 5.4. Skills Gap The workforce planning process has identified skills gaps across the resource in digital and change management skills. The Learning and Development Strategy will address these gaps through learning and development activity to support and improve change management skillsets and decrease skills gaps across IT services to enable them to fully support digital transformation across the Resources and the Council. 5.5. Delivery of Key Activities To deliver the key areas of activity for the Resource, there are challenges relating to increased service demand on Corporate Services, for example IT services are leading on digital transformation council wide. In addition, the Learning and Development Team will support the delivery of management and leadership development and sustainable development and climate change strategy through facilitating training requirements across Resources. The Resource will review staffing arrangements and prioritise requirements to deliver key activities as detailed above and such as supporting Marmot and the implementation of new technologies. Services will also undertake skills assessments to enable them to provide support for the implementation of new technologies, projects and outcomes of service reviews. 5.6. Employee Wellbeing There are challenges across services in terms of absence management, staff resilience and continuing to build on and further develop methods of employee engagement. Personnel Services are recruiting additional resources to support 82
Page 83
managers in managing absence. The service will also continue to review and improve supports to enhance employee wellbeing and engage with Trade Unions in line with Partnership Working arrangements. 6. Monitoring Arrangements 6.1. Workforce Plans will be monitored through Resource Management Teams and updates provided to the Committee on an annual basis. 6.2. Workforce planning is incorporated into Resource risk registers to acknowledge that having the right workforce with the right skills at the right time is reliant on the key workforce actions progressing. There are some workforce actions addressing national challenges, for example, national campaigns to promote career pathways in local government and funding available for specific training opportunities to address skills shortages. There is a risk if these actions do not progress that there will be shortfalls in the workforce that can impact on service delivery. 7. Employee Implications 7.1. Having a Workforce Strategy and proactive workforce planning process in place ensures an effective workforce is in place to deliver Council services. 8. Financial Implications 8.1. There are no costs associated with undertaking the workforce planning process, the activities detailed above, for example learning and development plans will be met from existing budgets. 8.2. Planning for appropriate workforce arrangements demonstrates effective and efficient use of resources. 9. Climate Change, Sustainability and Environmental Implications 9.1. There are no implications for climate change, sustainability or for the environment on this report. 10. Other Implications 10.1. There are risks to the Council in not ensuring that there are clear links between the workforce planning process and the overall Council planning process. 11. Integrated Impact Assessment and Consultation Requirements 11.1. This report does not introduce a new policy or strategy, and no impact assessments are required. An integrated impact assessment was undertaken for the Workforce Strategy. 11.2. Trade Unions been involved in the workforce planning process and updated through updates to JTUC Executive. Resource workforce planning activity is reported through JCCs. Jackie Taylor Executive Director (Finance and Corporate Resources) 5 August 2025 83
Page 84
Link(s) to Council Values/Priorities/Outcomes Values Focused on people and their needs Working with and respecting others Accountable, effective, efficient and transparent Ambitious, self-aware and improving Fair, open and sustainable Excellent employer Priorities We will work to put people first and reduce inequality We will work towards a sustainable future in sustainable places We will work to recover, progress and improve Outcomes Caring, connected, sustainable communities Thriving business, fair jobs and vibrant town centres Inspiring learners, transforming learning, strengthening partnerships Previous References None List of Background Papers Council Workforce Strategy and Plan 2025 to 2027, Executive Committee 28 May 2025 Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Eileen McPake, HR Business Manager Ext: 4668 (Tel: 01698 454668) E-mail: eileen.mcpake@southlanarkshire.gov.uk 84
Page 85
85
Page 86
Finance and Corporate Workforce Plan 2025 – 27 1. Introduction 2. Resource Overview 3. Key Areas of Focus 4. Resource Workforce Profile 5. Resource Workforce Plan 6. Risk Implications 7. Monitoring the Plan Appendix 1 – Review of 2022-25 Actions Appendix 2 – Finance and Corporate Workforce Profile Appendix 3 – 2025 – 27 Finance and Corporate Workforce Planning Actions 86
Page 87
1. Introduction South Lanarkshire Council delivers a wide range of services across the community that improve the lives of everyone living in South Lanarkshire. At the heart of the Council vision are values based on fairness, empathy, and a commitment to make a difference for the people of South Lanarkshire. The Council strives to be high achieving and high performing and to achieve this requires an available, capable, and resilient workforce. The Council Plan 2022 – 2027 sets out the Council priorities and how these will be delivered. The foundations of the Council plan are based on People, Planet and Progress. To deliver the Council priorities, the Council has a Workforce Strategy which sets out the workforce planning framework used to identify the key strategic drivers, service demands and the actions to ensure that the Council has the right people in the right place at the right time to deliver our vision. This framework has been used to produce Resource and Council workforce plans, which outline the workforce challenges and actions for South Lanarkshire Council. The previous workforce plans covered 2022 – 2025 and this Council Workforce Plan covers the period 2025 – 27, to align with the lifecycle of the current Council Plan. 2. Resource overview The services within Finance and Corporate Resources help to ensure that the council operates successfully in an increasingly complex and challenging environment, and although diverse, each service is essential to the running of the council and the delivery of its vision, values, and priorities. Administration and Legal Services provide essential support for the core democratic and governance arrangements of the council as well as providing a full range of legal advice and support, managing electoral events and licensing and registration services to the public. Finance Services provides sound financial stewardship to ensure the council’s priorities are effectively funded and expenditure, including procurement, is appropriately monitored, controlled, and reported. Finance Services is split between transactional activities including payables, procurement, risk management and insurance, benefits and revenues, customer services and money matters advice; and Strategy which includes budget strategy, budget monitoring and providing financial support to all Resources. Information Technology Services supports all council services through the maintenance of over 5,000 computers and servers running over 200 business applications across council Resources. This delivery is supported by council-wide networks covering telephones, printing, mail, and internet technologies. Personnel Services is responsible for the delivery of the personnel provision within the council and covers providing information and support to employees and the implementation of personnel policies. This includes personnel, payroll, employee learning and organisational development; complaints and consultation; delivery of training, further education and apprenticeships, health, safety, and wellbeing. And is responsible for the co-ordination and implementation of equality and human rights legislation, good practice, and supporting and promoting diversity, equity, and inclusion 87
Page 88
for all. The Resource is also responsible for Internal Audit, which provides assurance on the effectiveness of the council’s risk management, control, and governance arrangements. Communications and Strategy (which is part of the Chief Executive’s Office) provides a range of key corporate services in support of all Resources as well as accurate, timely information for employees and residents. The service is responsible for the council's publications, its websites, intranet, and social media. It also co-ordinates all Media enquiries. The service incorporates the Resilience team, the Research and Improvement Unit as well as the Community Engagement Team, which provides support to the Community Planning Board, and provides a single interface for community engagement including neighbourhood planning. 88
Page 89
3. Key Areas of Focus Overview The Resource has identified the main challenges, risks and new developments which will have significant impact on the delivery of services in the coming year. These are outlined briefly below. Cost of Living In recent years, the UK experienced the worst cost-of-living crisis in 40 years, and the impact is ongoing. While all sectors of society continue to see prices rise, the impacts are greatest for those on the lowest incomes. The council recognises the pressures being faced by households across South Lanarkshire and acknowledges the additional demands on council services as a result. The council has in place a range of support which can help households manage scarce resources and services will continue to explore all avenues to support the most vulnerable in the year ahead. Financial Strategy The Resource leads on financial planning and reporting for the council. Over recent years, the challenges for Local Government finance have continued, around balancing pressures of meeting additional demand and costs of delivering services. The challenges local authorities have faced have been extraordinary and these financial challenges are expected to continue. The budget gap faced by the council in recent years has meant that the council has had to consider how and what services we can deliver going forward. A key part of the financial management process is the development of Financial Strategies, developing financial plans which deliver the council’s visions, values, and priorities, while at the same time recognising and responding to financial constraints. Financial strategies are prepared annually and approved by members leading to the final approval of annual budgets. This process includes consideration and approval of efficiency and savings options and considers requirements for investment. In the current financial environment, the challenges around consideration and approval of savings options will be key. The council’s programme of Transformational Reviews (both Resource specific and council-wide) continues to play a key role in addressing the Budget Gap identified in the council’s Budget Strategy. The strategic approach to financial planning also includes planning for Capital programmes of work. Involving our Communities Our Council and Community plans both reflect the priorities of our communities and connect to the neighbourhood plans created in smaller areas of South Lanarkshire. We will continue to progress delivery of these, developing appropriate ways to codesign services with local people. Our ambition is that all communities in South Lanarkshire are empowered to lead on their local priorities and can see positive changes taking place through the way we work together. We will continue to support community groups to represent the views of their neighbours and to work together to address issues that matter to them. We will work to develop opportunities for our community to take action themselves, including continuing to support community asset transfer and helping them to take action to improve sustainability. 89
Page 90
Strategic Workforce Planning The Resource is responsible for co-ordinating workforce planning for the Council and the facilitation of Resource Workforce Plans. The Workforce Strategy sets out the council’s approach to its workforce, which supports the ‘people’ elements of our workforce strategy and plans. South Lanarkshire Council and its employees continue to go through a period of change which will impact on how we deliver services in the future. The Strategy will continue to ensure the impact of the key challenges facing councils is reflected, mitigated where possible, and risks managed. Oracle Fusion The Oracle system (People Connect/HRMS, FMS) has been successfully migrated to Fusion, Oracle’s cloud-based Human Resources (HR) and Finance solution. This was a significant change programme affecting the whole workforce and work will continue to focus on delivering significant improvements to processes, workflow, support agile working, employee self-service and engagement as well as greater levels of automation and improved management information. This change project will also provide a platform for continuing service improvements and efficiency. Strategic Digital Developments The council is continuing to invest in digital technologies to improve the delivery of services to citizens, streamline and standardise business processes, and improve collaboration and partnership working (for example Health and Social Care Partnership - HSCP). This investment is targeted at delivering significant productivity improvements and cost savings. Information Technology (IT) has a major part to play in the ongoing digital transformation of the council by implementing and supporting new technologies at pace and at scale, including emerging areas encompassing artificial intelligence. IT projects will continue to be prioritised based upon need, business case and alignment with council priorities. Partnerships with Local Government Digital Office, NHS Lanarkshire, Scottish Government, and key suppliers will be leveraged to share best practices and accelerate rollout and adoption of new digital solutions. IT will continue to maintain high levels of availability of IT estate and high levels of support to officers and elected members. Key IT activities will include the move from analogue to digital telephony in line with Ofcom’s national programme, replacement of key legacy business applications (for example Housing and Property, Social Work and Telecare alarm receiving) and the rollout of digital connectivity solutions to improve performance and security of internet access, deliver wider economic benefits through digital connectivity and support digital inclusion. Sustainable Development and Climate Change The council acknowledges the serious and immediate threat of climate change and is committed to accelerating the pace of action in response to the climate emergency and in Scotland’s transition to a net-zero and climate resilient society and economy. It is expected that, as a public body, the council leads by example and uses its role to influence area-wide climate change, action and sustainability. The Sustainable Development and Climate Change Strategy (2022-27) sets out how the council aims to develop sustainably and tackle climate change. The overall picture is one of clear aspirations and commitment, but residual risks scores reflect the challenges and remain very high corporately even despite the level of mitigations that are being put in place. Over time, how to fund will remain one of the 90
Page 91
most significant risks. Continued Development of the Council Transformation Programme The council has had a programme of transformation reviews over recent years, which have fed through to deliver outcomes in terms of savings, efficiencies, and transformation programmes. Change has been the one constant in recent years, and this is reflected in the guidance to support managers to deliver their transformational projects. It is important that managers and leaders are equipped to lead transformation, and that review and improvement processes are adopted and welcomed. Through addressing the ongoing financial challenges, there is the opportunity to shape council services which are responsive, flexible, and fit for the future. A transparent process which is understood by all involved, the early involvement of those affected, and honest evaluation of options are key features of our continued approach. Customer Engagement A review of customer engagement across the council is being led by Finance and Corporate Resources. The review will assess the range of systems and processes used to support customer contact and identify opportunities for improvement including the consideration of digital technologies. Other activities include the appraisal of the strategic positioning of customer services within the council and ensuring the needs of stakeholders are met. Digital Transformation The Digital Transformation review is led by Finance and Corporate Resources and defines three key areas of transformation: Business Systems and Processes, Workforce Productivity, and Customer Engagement, which is a separate review. The review will assess the current digital maturity of the council, develop a clear vision for digital transformation, and identify opportunities for improvement through the use of digital technologies. It will also involve the development of a detailed project plan, standard methods and approaches to transformation, and engagement with external expertise and support where required. The ultimate goal is to improve process efficiency, optimise service delivery, and ensure that digital services are accessible to all residents. The review will also support the demonstration of best value and alignment with the Audit Scotland report on 'Transformation in councils’. 91
Page 92
4. Finance and Corporate Workforce Profile Overview The full workforce profile is attached in Appendix 2. The data reviewed covers the period April 2023 – March 2024. Resources used this data to complete their workforce plans for 2025 – 2027. The key highlights from the workforce profile are detailed below. Employee Numbers For April 2023 – March 2024, Finance and Corporate Resources employed an average of 906 employees, equating to 802.8 Full Time Equivalent (FTE). The workforce is split across seven services; the split of each Service is shown below in Table 1 by headcount (number of employees) and total FTE. Table 1 Employee numbers Finance and Corporate Services Headcount FTE Total Resource 906 802.8 Administration and Legal 85 73.91 Internal Audit 13 11.32 Communications and Strategy 48 46.04 Finance - Strategy 69 66.16 Finance - Transactions 386 328.11 Information Technology 99 91.71 Personnel 202 181.55 Directorate 4 4.0 Employment Status As of 31 March 2024, FCR employed 882 employees. There were 30 employees who are in a temporary position, 848 employees in a permanent position and 4 casual employees. This is detailed in table 2. The majority of the Service’s workforce is employed on a full-time basis; the highest proportion of part time employees is within Finance Services – Transactions. Table 2 Employment Status Finance and Corporate Services Permanent Employees Temporary Employees Casual Employees Total Employees Total Resource 848 30 4 882 Administration and Legal 80 - - 80 Internal Audit 12 - - 12 Communications and Strategy 44 4 - 48 Finance - Strategy 63 5 1 69 Finance - Transactions 369 7 3 379 Information Technology 98 - - 98 Personnel 178 14 - 192 Directorate 4 - - 4 92
Page 93
Gender Split The gender split across Services* is detailed in Table 3. The Resource workforce consists of 25.1% male and 74.9% female. Table 3 Gender Split Finance and Corporate Services Female Male Total Employees Total Resource 657 221 878 Administration and Legal 64 16 80 Internal Audit 7 5 12 Communications and Strategy 29 19 48 Finance - Strategy 49 19 68 Finance -Transactions 319 57 376 Information Technology 36 62 98 Personnel 150 42 192 Directorate 3 1 4 As at 31 March 2024 and excluding casual employees Age Range The age range across Services is detailed in Table 4. Seventy-seven percent of the workforce are age 40 or over. Finance - Transactions has the highest employee numbers aged 65 and above, as well as the highest number of employees aged 50 and above. Personnel has the highest number of employees aged 16-19 years. Table 4 Age Range Finance and Corporate Services 16-19 Years 20-29 Years 30-39 Years 40-49 Years 50-59 Years 60-64 Years 65+ Years No. Employees Total 8 62 135 208 353 89 23 878 Administration and Legal - 5 8 22 33 11 1 80 Internal Audit - - 1 3 8 - - 12 Communications and Strategy - 2 5 10 25 5 1 48 Finance - Strategy 2 2 7 15 34 8 - 68 Finance - Transactions 1 22 68 96 136 44 `9 376 Information Technology - 9 16 17 44 8 4 98 Personnel 5 22 29 45 70 13 8 192 Directorate - - 1 - 3 - - 4 As at 31 March 2024 excluding casual employees. 93
Page 94
Absence The absence rate for the Resource for 2023/24 was 3.48%. The details are in table 5. Table 5 – Absence rates Finance and Corporate Services Absence 23 /24 Finance and Corporate 3.48% Administration and Legal 5.84% Internal Audit 5.74% Communications and Strategy 2.78% Finance - Strategy 1.33% Finance - Transactions 4.27% Information Technology 2.23% Personnel 2.45% Directorate 0.0% As at 31 March 2024, excluding casual employees. Leavers and Turnover From 1st April 2023 to 31st March 2024, 86 employees left the Resource, equating to 66.48 FTE. The turnover rate for the Resource for 2023/24 was 9.50%. This turnover rate is calculated using all leavers. Recruitment During 2023/24 across the Council, 1,931 posts were advertised attracting 15,592 applications. Candidates were appointed to 1,453 posts. The difference can be attributed to the notional number of vacancies applied to rolling campaigns. This is not a reflection of non- filling of posts. For Finance and Corporate Resources during 2023/24, 77 posts were advertised attracting 946 applications and 84 candidates were appointed. Positions can be advertised to recruit for single or multiple vacancies; this accounts for the higher number of candidates appointed than posts advertised. Full details of the workforce profile are attached in Appendix 2. 5. Resource Workforce Plan Resource Workforce plans were produced covering the period 2022 – 25. These plans have been reviewed to provide an update on actions to date and to identify any ongoing activity to be reflected in the 2025 – 27 plans. A summary of the review is included in Appendix 1. During 2024, Resources undertook a horizon scanning exercise as part of the Resource planning process to identify key areas of focus moving forward. Following this, working with HR Business Managers, Heads of Service completed the workforce planning toolkits to consider the workforce requirements to deliver resource plan outcomes, local and national drivers, as well as known and anticipated changes that will impact on the workforce. The workforce profile information was also taken into account as part of this exercise. Common themes emerged across all Resources and the priority workforce planning areas to focus on and meet the challenges are as follows: • Recruitment / Attraction and / retention • Transformation • Skills gap 94
Page 95
• Delivery of key activities • Employee well being All of this activity identified the key workforce challenges and the actions for Finance and Corporate Resources. A summary is provided in the table overleaf. Summary of challenges and actions Priority Identified Need Key Challenges Action Recruitment / Attraction / Retention Age profile of existing workforce Loss of knowledge, skills, and experience Professional and specialist posts are hard to recruit and retain. Continue to use ‘grow our own’ approach to increase workforce supply and develop existing employees to progress Implement robust succession planning process. Promote the Council as employer of choice Use graduate traineeship to attract newly qualified graduates who can develop into professional roles, for example procurement, accountants and IT specialists. Transformation Maintaining services, alongside managing programmes of transformation and change. Impact of providing cross council support for transformation and ability to contribute to financial savings Continuing service improvement from Oracle Fusion Consider options for vacant posts and review management structures. Review of Money Matters Advice Service and customer contact review Progress Digital transformation review Support the cross-Council transformation reviews Manage efficiencies achieved as Oracle fusion is embedded Skills gap Skills to support organisational transformation Leadership development 95
Page 96
Digital upskilling and specialist knowledge Develop skills in the L&D team to support change management Skills development to support strategic IT. Delivery of Key Resource Activities Strategic digital development and how this is supported Community involvement Support the Council achieve net zero and deliver sustainable development and climate change Increased demand for services Support for implementation of new technologies Support digital transformation by ensuring employees have skills to deliver the strategy Review of staffing required to support Marmot L&D developments to support delivery of Climate and Sustainable Development Strategy Ensure structures in place to support increased demand for services Address skills gap in IT service e.g., business analysis, service design and user research Employee Wellbeing Maintaining employee wellbeing and resilience Reducing absence Improved employee engagement Review of employee supports Recruit additional personnel officer and assistants to support absence management The Finance and Corporate Resource Workforce Action Plan is attached in Appendix 3. This provides the detail on the actions to deliver the plan, how they will be achieved, who is responsible for the delivery, the expected outcomes, and the timescales to be achieved by. Engagement and consultation to produce workforce plans has been primarily through HR Business Managers and Resource Management Teams, Trade Unions have been updated on activity through JTUC Executive updates and Trade Unions were also asked to provide details of workforce challenges from TU perspective via a survey. 96
Page 97
6. Risk Implications The actions identified assist the Council to achieve the right people with the right skills to deliver services. However, there are risks if these actions are not achieved, these are: • Reduced workforce supply is a risk to meeting the Council’s requirements • Ability to train and develop staff to create our own talent into specialist roles within required timescales and maintain service delivery • Competing recruitment drives across services and sectors The risks identified with workforce planning will be included in the Resource risk registers. 7. Monitoring the Plan The action plan will be monitored through Resource Management Teams. As the arrangements on national initiatives emerge any significant changes will be reflected in updated action plans. Resource workforce plans will be formally reported through annual updates on actions to Resource Committees. The Council workforce plan will be reported to Executive Committee on an annual basis. 97
Page 98
Appendix 1 Review Workforce Plan Actions 2022 – 25 An update on the key actions from the Finance and Corporate 2022 – 25 workforce plan is provided below: Priority / identified need Actions Achievements Next steps 1a Increased demand and reduced workforce pool Revised recruitment practices, utilise employability routes. Revised recruitment practices are now embedded The introduction of essential and desirable criteria in job profiles, assist in shortlisting Oracle fusion, recruitment processes have been reviewed Successful graduate trainees in IT, procurement and finance to fill hard to recruit posts This will be addressed through further review and revisions to the Recruitment Strategy and the Learning and Development Strategy 1b Succession Planning Succession planning is discussed as part of appraisal process and potential leaders are nominated to join the Leadership Development programme, there are currently 3 delegates enrolled from F&C. This will be addressed through further revisions to the Recruitment Strategy and the Learning and Development Strategy 2a Service Design and Efficiency savings Managing employee impact of savings Employee reductions as an outcome of reviews have been managed The revision of SWITCH2 arrangements in relation to managing 98
Page 99
through successful redeployments. employee impact of savings activity will ensure that employee skills are maximised. 2b Service Redesign The Council has a programme of transformational reviews to enable services to be delivered in a different way to achieve efficiencies. The transformational review programme is ongoing, and current reviews are within services areas, as well as reviews of overtime reduction and organisational structures. 3a IT / Digital Implementation of Fusion (HR, finance, and procurement) The new system was implemented in August 2024 and processes have been improved to reflect the capability of the new system. The workforce planning process has matured to provide a specific focus to consider the workforce supports for the delivery of a Digital Council 3b Implementation of Resource IT systems IT services are supporting the implementation of Liquid Logic, Social Work Resources and HOME, Housing and Technical Resources. As the Council moves towards more digital solutions the workforce plans will reflect actions to ensure that our workforce is digitally aware and included. 4 Employee support and wellbeing Enhance employee support Revised occupational health provision Employee supports will continue to be 99
Page 100
has enhanced the support available to employees reviewed to ensure the supports are accessible to all employees. There is a review of Maximising Attendance Policy and supporting procedures to ensure that the Council continues to develop good practice to support and engage the workforce 100
Page 101
21 Workforce Profile: Finance and Corporate Resources Appendix 2 Section 1: Average Headcount and Full Time Equivalent For the year 2023/24, South Lanarkshire Council (SLC) employed an average of 17,086 employees, equating to 14,046 Full Time Equivalent (FTE). Finance and Corporate Resources employs 906 employees at 803 FTE, accounting for 5% of the Council’s headcount. The headcount and FTE for each Service is shown in Table 1. Table 1 – FCR Headcount and FTE Headcount - 906 FTE - 803 Service proportions remain equal sized by Headcount and FTE, with employees contracted on average for 0.89 FTE. Section 2: Employment Categories and Hours Worked As at 31st March 2024, Finance and Corporate Resources employed 881 employees, with a combined total of 898 assignments. 4 employees were categorised as Casual and of these, 4 were employed in their main post as a Casual Employee. 9 employees with a primary Permanent or Temporary post also held a second assignment as a Casual Employee. Admin & Legal 85 9% Audit & Improvement 13 1% Communications 48 5% Directorate 4 1% Finance - Strategy 69 8% Finance - Transactions 386 43% IT 99 11% Personnel 202 22% Admin & Legal 73.91 9% Audit & Improvement 11.32 1% Communications 46.04 6% Directorate 4.00 1% Finance - Strategy 66.16 8% Finance - Transactions 328.11 41% IT 91.71 11% Personnel 181.55 23% 101
Page 102
22 Table 2: Employment Category Split Resource Permanent Employees Temporary Employees Casual Employees Total Employees SLC 15377 594 769 16740 Finance and Corporate 848 30 4 882 Administration and Legal 80 - - 80 Internal Audit 12 - - 12 Communications and Strategy 44 4 - 48 Finance - Strategy 63 5 1 69 Finance - Transactions 369 7 3 379 Information Technology 98 - - 98 Personnel 178 14 - 192 Directorate 4 - - 4 Three quarters of Casual Employees are employed within Transactions as Call Services Assistants. *Please note that for all further data sets, Casual Employee figures have been removed. The total number of employees employed by SLC as at 31st March 2024 is therefore 15,971 and Finance and Corporate, 878. The majority of the Council’s workforce is employed on Full Time contracts, which for the purposes of this report, has been taken to mean employees working 35 hours or greater per week at a Full Time Equivalent greater than or equal to 0.90. Term – Time employees who meet these criteria over 39 weeks have also been included in the Full – Time count. As shown below, 56% of SLC’s workforce were employed Full Time, with the remaining 44% categorised as Part Time employees as of 31st March 2024. The full-time split of Finance and Corporate Resources and its Services is shown alongside this: Permanent 96% Temporary 3% Casual 1% 102
Page 103
23 Table 3: Part Time / Full Time Split Full Time Split as Percentage Full Time Split of Service Resource Total FT Total PT No. Employee s South Lanarkshire Council 9267 6704 15971 Finance and Corporate 591 286 878 Administration and Legal 53 27 80 Audit & Improvement 8 4 12 Communicatio ns and Strategy 42 6 48 Finance - Strategy 54 14 68 Finance - Transactions 216 160 376 Information Technology 79 19 98 Personnel 136 56 192 Directorate 4 - 4 Finance and Corporate’s services generally see high percentages of full-time employees. Part – Time employees within Transactions are most commonly Benefits and Revenue Officers, Clerical Assistants and Customer or Call Services Assistants. FT 67% PT 33% Administration and Legal 66% Audit & Improvement 67% Communications and Strategy 88% Finance - Strategy 79% Finance - Transactions 57% Information Technology 81% Personnel 71% 103
Page 104
24 Section 3: Leavers and Turnover Leavers From 1st April 2023 to 31st March 2024, 1709 employees left the council, equating to 1239.55 FTE. 86 Leavers (66.48 FTE) held positions within Finance and Corporate Resources. Table 4 shows the total leavers by Service and displays the headcount as a percentage of total leavers from each Service. Table 4: Leavers by Resource Service Contribution to Resource Leavers Resource No. of Leavers Total FTE South Lanarkshire Council 1709 1239.55 Finance and Corporate 86 66.48 Administration and Legal 17 13.29 Internal Audit 1 0.5 Communications and Strategy 2 2 Finance - Strategy 12 10.04 Finance - Transactions 27 17.55 Information Technology 10 9.03 Personnel 16 13.07 When looking at the distribution of leavers by headcount (as above), Administration and Legal, and Finance – Strategy sees slightly higher proportions of leavers relative to their size, with Finance Transactions being the highest number of leavers overall. Leave Reasons are explored in Tables 5. Admin & Legal 20% Internal Audit 1% Communications 1% Finance - Strategy 14%Finance - Transactions 31% IT 14% Personnel 19% 104
Page 105
25 Table 5: Reasons for Leaving Finance and Corporate Resources As shown above, the five most common reason for leaving Finance and Corporate were Retirement (45% of all leavers), followed by Career Development (20%), Personal Reasons (12%), Termination of Temporary / Fixed Contracts (5%) and Dismissal Due to Ill Health (3%). In total, these five reasons account for 85% of all leavers in the year 2023/24. The top five reasons for leaving by Headcount are shown by Table 6 on the next page for each Service, as a percentage of that Service’s total leavers: 0 5 10 15 20 25 30 35 40 45 Nuber of Leavers Count of Assignment Sum of FTE 105
Page 106
Finance and Corporate Administration and Legal Internal Audit Communications and Strategy Finance – Strategy Finance – Transactions Retirement 45% Career Development 20% Personal Reasons 11% Termination Of Temporary/Fixed Term/Contract Staff 5% Dismissal Due To Ill Health 3% Other 16% Retirement 35% Personal Reasons 23% Career Development 18% Dissatisfaction With Terms & Conditions Of Job 12% Moving Outwith Area 6% Other 6% Retirement 100% Moving Outwith Area 50% Retirement 50% 106
Page 107
IT Services Personnel Retirement is the most common leave reason across all Services, excluding Personnel, where 44% of employees leave due to Career Development. Retirement 42% Career Development 25% Personal Reasons 17% Retirement Due To Ill Health 8% Dismissal Due To Ill Health 8% Retirement 45% Personal Reasons 15% Career Development 15% Resignation - No Notice Given 11% Termination Of Temporary/Fixed Term/Contract Staff 7% Other 7% Retirement 80%Child Care/Caring Responsibilities 10% Dismissal Due To Ill Health 10% Career Development 44% Retirement 31% Termination Of Temporary/Fixed Term/Contract Staff 13% Gross Misconduct 6% Dismissal Due to Ill Health 6% 107
Page 108
Turnover Turnover for the year 2023/24 was calculated as the total number of employees who left the Council from within Finance and Corporate Resources between 1st April 2023 and 31st March 2024 (86), divided by the average number of employees in post during the year (906). The Turnover Rate for Finance and Corporate Resources for 2023/24 was 9.50% and is broken down by Service below. This is lower than the Council rate of 10.46%. Table 7: Resource Turnover Turnover varies significantly between Services, with Administration and Legal, and Finance – Strategy reaching nearly 20% (and having some of the highest turnover rates across the Council). Within Administration and Legal, the most common role to leave was Solicitor, 30% (with the most common reason being dissatisfaction with terms and conditions of job, 40%) which may indicate higher levels of external competition, although it should be noted when drawing conclusions that the data set of Leavers is relatively small. There are no clear patterns for Finance – Strategy, however the most common leave reason, Retirement (42%) indicates an ageing workforce which will be covered further in Section 4. Finance and Corporate, 9.50% Admin & Legal, 19.98%Internal Audit, 7.84% Communications, 4.13% Finance - Strategy, 17.43% Finance - Transactions, 7.00% IT, 10.09% Personnel, 7.93% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 16.00% 18.00% 20.00% 108
Page 109
Section 4: Age Profile Table 8: Finance and Corporate Resources Age Profile Resource 16-19 Years 20-29 Years 30-39 Years 40-49 Years 50-59 Years 60-64 Years 65+ Years No. Employees South Lanarkshire Council 61 1862 3536 3749 4475 1670 618 15971 Finance and Corporate 8 62 135 208 353 89 23 878 Administration and Legal - 5 8 22 33 11 1 80 Internal Audit - - 1 3 8 - - 12 Communications and Strategy - 2 5 10 25 5 1 48 Finance - Strategy 2 2 7 15 34 8 - 68 Finance - Transactions 1 22 68 96 136 44 `9 376 Information Technology - 9 16 17 44 8 4 98 Personnel 5 22 29 45 70 13 8 192 Directorate - - 1 - 3 - - 4 As shown, South Lanarkshire Council has a predominantly older workforce, with 66% of employees being aged 40 or over and the largest age demographic being 50-59, with 28% of the Council’s total employees. Finance and Corporate has an older workforce than the majority of SLC Resources (second only to Community and Enterprise), with 77% aged 40 years or over and 53% being aged 50 or over. The largest age demographic is 50 – 59 Years with 40% of employees in this category. Table 9 (below) shows the makeup of each Service by age demographic: 16-19 Years 1% 20-29 Years 7% 30-39 Years 15% 40-49 Years 24% 50-59 Years 40% 60-64 Years 10% 65+ Years 3% 109
Page 110
Table 9: Proportion of Age Band by Service One Service within Finance and Corporate has the majority of its workforce aged under 50 years – Personnel (53% of employees aged under 50 years). This Service also sees the highest proportion of employees aged under 40 years within the Resource (29%), with the majority of employees aged 16 – 39 years employed as Clerical Assistants (36%) and Personnel Assistants (29%). Audit and Improvement, Communications and Strategy and Finance – Strategy, have higher than average workforces with 67%, 65% and 62% of employees aged 50 years or over respectively. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Administration and Legal Internal Audit Communications and Strategy Finance - Strategy Finance - Transactions Information Technology Personnel 16-19 Years 20-29 Years 30-39 Years 40-49 Years 50-59 Years 60-64 Years 65+ Years 110
Page 111
Section 5.1: Absence Rate Absence rates for the Council are calculated each calendar month by dividing the total number of workdays lost due to absence by the total number of work days available for that period. The absence rate for South Lanarkshire Council for the year 2023/24 was 5.38%. The absence rate for Finance and Corporate Resources was 3.48% which is down vs. the previous year (3.75%). Total Absence % (2023/24) Short Term and Long-Term Absence % (2023/24) The total level of absence has decreased throughout the year, with a one-point drop-in long-term absences between April 23 and March 24 being the main contributing factor. Short term absences have risen slightly across the year. Absence levels by Service are shown in Table 10. 0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00% 3.50% 4.00% 4.50% 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 Short Term sick % Long Term Sick % Linear (Short Term sick %) Linear (Long Term Sick %) 111
Page 112
Table 10: Service Absence Levels Three Services sit above the Resource average and are shown in more detail in Table 11. In addition to this, Administration and Legal, and Audit and Improvement both exceed the Council average. Table 11: Service Absence – April 2023 – March 2024 All three services have different factors contributing to their absence rates. Due to the smaller size of Audit and Improvement, individual absences are weighted more heavily, and this appears to be the case above, with a single long-term absence pushing the Service to >8% before closing in November. Finance – Transactions and Administration and Legal both see higher baseline levels of absence, with Administration and Legal almost exclusively due to Long – Term absences, while Finance – Transactions sees contributions from both Short and Long – Term. Admin & Legal 5.84% Internal Audit 5.74% Communications 2.78% Finance - Strategy 1.33% Finance - Transactions 4.27% IT 2.23% Personnel 2.45% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Administration and Legal Audit and Improvement Finance - Transactions 112
Page 113
Section 5.2: Absence Categories The total number of working days lost in the year 2023/24 for Finance and Corporate Resources was 7315, which accounts for 4% of all working days lost by the Council. Table 12 shows the number of working days lost due to specific categories of absence for the year 2023/24. The top four Reasons for absence are shown and the remaining categories aggregated into Other. Table 12: Days Lost Due to Absence Reason Psychological absences were the leading reason for absence, accounting for 47% of absences throughout the year, followed by Respiratory (11%), Musculoskeletal (11%) and Stomach (7%). The proportion of Psychological absences is significantly higher than the Council average (35%) and is the highest level of Psychological absences of any Resource. Due to the year-to-year fluctuation of total numbers of absence, absence proportions are compared below. Each absence reason has been calculated as a percentage of ‘working days lost due to absence reason’ divided by ‘total working days lost in year’ to illustrate changes in absence across the years 2022/23 – 2023/24. 0 500 1000 1500 2000 2500 3000 3500 4000 Musculoskeletal Psychological Stomach Respiratory Other 113
Page 114
Table 13: Absence Reasons – Year to Year Comparison The Resource absence rate decreased in 2023/24 vs. 2022/23, and the majority of absence categories either remained at the same proportion or reduced, with the exception of psychological absences which rose 8 points from 2022/23 and accounted for 47% of all absence reasons. Although this trend is in line with the rest of the Council, where the proportion of psychological absences has increased across all Resources year on year, the size of the increase within Finance and Corporate Resources is significantly higher. Looking at the proportion of psychological absences as an average across the 2-year period (Table 14), we see a slightly different trend than elsewhere in the Council, where psychological absences increase across the Autumn / Winter period, peaking around April – May and at their lowest in July – August. 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Musculoskeletal Psychological Stomach Respiratory Other 2023/24 2022/23 114
Page 115
Table 14: Proportion of Psychological Absences per Month (2-year average) Here we see psychological absences generally sustained at a high level throughout Spring / Summer, before increasing from late Summer onwards and peaking in October. The proportion of absences reduces throughout the second half of the year, falling to their lowest level in January 20% 25% 30% 35% 40% 45% 50% 55% 60% Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 115
Page 116
Finance and Corporate Strategic Workforce Action Plan 2025 -2027 Appendix 3 Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications Recruitment, attraction and retention Promote the Council as an employer of choice through employee branding and also linking to national developments through Scotland Local Government Workforce actions Attract more candidates for hard to fill posts Successful recruitment of the right candidates for the right posts Personnel Adviser (recruitment) Revised recruitment adverts will be provided by the recruitment team and hirings managers will provide context relevant to specific roles December 2025 Within existing resources Promote career pathways and progression in professional roles using graduate recruitment, links with colleges and universities Attract more candidates for hard to fill posts Personnel Adviser (recruitment) Revised recruitment adverts will be provided by the recruitment team and hirings managers will provide context relevant to specific roles December 2025 Within existing resources Continue to develop ‘grow you own’ approach. Specific roles identified: Talent pool of developed staff to fill professional roles as they become available HR Business Managers Heads of Service and work with vocational development officer to progress trainee December 2025 Within existing resources 116
Page 117
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications Trainee accountant, Procurement and IT specialists programme for hard to fill roles. Implement succession planning process for Grade 5 managers across all services to identify and develop future leaders Developed future leaders to replace departing senior managers Learning and Organisational Development and Manager HR Business Managers and Resource management teams December 2025 Within existing resources Transformation Identify and manage efficiencies achieved as oracle fusion is embedded Teams aligned to oracle fusion functionality, creating capacity across finance, IT and personnel Head of Services – IT, Finance (transactions) and Personnel HR Manager (operations), Procurement Manager, Finance Managers December 2025 Additional external resources will be required to support this activity Ensure that services have the skills and capacity to support digital transformation across the Council Employees and teams operating effectively with digital solutions / innovation to service delivery Head of IT Services Heads of Service require to consider digital solutions as part of service review and work with IT service to ensure that employees are equipped to deliver the digital strategy December 2025 Within existing resources 117
Page 118
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications Identify skills to support and leverage Artificial Intelligence Employees operate with the use of artificial intelligence Head of IT Services IT Senior Managers September 2025 Within existing resources Expand data literacy and data stewardship across the Council Network of data champions across resources and services Head of IT Services Heads of Service to identify data champions and they will be developed by IT services December 2025 Within existing resources Expand capabilities of IT services to drive change across the Council Improved and expanded skills and capabilities across the IT Service. Head of IT Services Heads of Service to identify data champions and they will be developed by IT services December 2025 Within existing resources Consider succession planning, options for vacant posts, and workload requirements and options in Communications and Strategy Structure in place to reflect the service delivery model (digital and design) Head of Service Communications and Strategy Communications Delivery manager September 2025 Within existing resources Skills Gap Skills to support change management Managers able to implement changes in services in a Head of Personnel Services L&D Managers through the leadership December 2025 Within existing resources 118
Page 119
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications across the Council (L&D team) structured supported way development programme and managers as change programme develops. Undertake a skills assessment across legal services to produce a structured training programme Skills aligned to teams and reduced risk of single points of knowledge / skills Head of Administration and Legal Services Legal Manager and Adviser December 2025 Within existing resources Undertake a skills assessment within Audit Continue programme of skills transfer. Identify potential skill gaps and use this to inform the next programme of skills transfer. Audit Manager Audit team December 2025 Within existing resources Address the skills gap in relation to Good Governance / Annual Governance Statement Staff available to support this area of work Head of Administration and Legal Services Administration and Legal teams/other Heads of Service as resources might be required from outside Administration and Legal Services December 2025 Within existing resources 119
Page 120
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications Upskill existing staff across services Development and progression of staff across services to address skills gaps Heads of Services All employees across services, how this will be delivered to be included in L&D strategy March 2026 Within existing resources L&D team developed to support awareness of climate impact All employees aware of climate impact and action Sustainability Adviser L&D manager and advisers December 2025 Within existing resources Recruit additional personnel officers to deliver maximising attendance actions Additional support for managers on the outcomes of maximising attendance review action, which will reduce absence across Resources. Head of Personnel HR Business Managers August 2025 Additional costs will be met by Resources. Address skills gap IT services – business analysis and service design, user research Increased skills and knowledge across IT services to meet demand Head of IT services IT managers and L&D adviser March 2026 Within existing resources Undertake review of training required for core Elections Team and create structured plan for Increased skills and knowledge across Elections Team to meet requirements Head of Administration & Legal Services Elections Team February 2026 Within existing resources 120
Page 121
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications implementation in advance of May 2026 Scottish Parliament Elections. including additional specialist training Identify steps required to reduce Digital exclusion Employees able to engage with digital services across the Council Head of Personnel Head of IT services, L&D Manager December 2026 Within existing resources Launch revised leadership development programme Future leaders identified and developed in conjunction with succession planning Head of Personnel Heads of Service and L&D Manager March 2026 Within existing resources Maintain ongoing CPD Maintenance of professional development standards Heads of Services Managers as part of appraisal process March 2026 Within existing resources Delivery of key Resource activity Maintain staffing levels to support Council decision making structure Staffing place to support service delivery Head of Administration and Legal Services Administration Teams March 2026 Within existing resources Review of work of Licensing & Registration team Staffing in place to support service delivery Head of Administration and Legal Services Legal Services Manager, Adviser March 2026 Within existing resources 121
Page 122
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications to reflect current available resources, to seek to meet target PIs recognising variable demand for services, including addressing demands in Private Landlord Registration and Licensing and Registration teams Refocus of work of legal team to reflect available resources, aligned to increased demand in legal services Staffing in place to support service delivery Head of Administration and Legal Services Legal Services Manager and Advisers March 2026 Within existing resources Review staffing requirement to support Marmot Staffing in place to support service delivery Head of Communications and Strategy Services Community Participation Manager March 2026 Within existing resources Review of tasks in finance, IT and personnel to reflect implementation of oracle fusion Tasks reflect the services delivered post implementation of Oracle fusion Head of Service IT, Finance and Personnel HR Business managers, Finance managers and IT managers December 2025 Within existing resources 122
Page 123
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications Continue to review staffing arrangements as oracle fusion progresses Staffing in place to support service delivery Head of Service IT, finance and Personnel HR Business managers, Finance managers and IT manager December 2025 Within existing resources Implementation of new case management system – Legal Services Staff able to operate new systems which will increase effectiveness and capacity Head of Administration and Legal Services Legal Services Manager, Legal Services Advisers and IT services December 2025 Within existing resources Resourcing the delivery of the transformational review of the Money Matters Advice Service New service structure in place and efficiency proposals. Head of Finance (Transactions) Money Matters Advice service manager with support from Personnel Services. March 2026 Within existing resources Review of staffing levels to support increased demand for procurement services Sufficient staff in place to support service delivery Head of Finance (Transactions) Procurement manager and advisers and procuring services. March 2026 Additional funding would be identified for any additional resources required Implement new technology to improve customer contact Staff able to operate new systems which will increase effectiveness and capacity Head of Finance (Transactions) Service managers and IT services June 2026 The implementation of new technologies would follow the approval of a business case that would set out any 123
Page 124
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications financial implications. Resourcing the Customer Engagement review through to implementation phase Sufficient staffing place to deliver programme of change Head of Finance (Transactions) Customer Services, IT services, Resource representatives and Personnel Services. June 2026 Any financial implications would be assessed as part of the business case phases. Liquid Logic implemented social work/finance transactions Staff able to operate new systems which will increase effectiveness and capacity Head of Finance (Transactions) Service managers and IT services December 2025 Within existing resources Support Microsoft 365 roll out Staff able to operate Microsoft 365 Head of IT services Service managers and IT services March 2026 Within existing resources Training for staff to support infrastructure and control (IT services) Reduces skills gaps across IT services Head of IT services IT managers September 2025 Within existing resources Improved employee engagement across servers Engaged employees will contribute to overall effectiveness of services Head of Personnel All managers across services March 2026 Within existing resources 124
Page 125
Priority/Identified Needs What are the future workforce priorities based upon your supply and demand analysis? Actions What specific actions that are needed to deliver? Anticipated Outcomes Lead Officer Who is responsible for delivery? Support What support do we need? Who else needs to be involved? Timescale What are the timeframes for delivery? Financial Implications Maintaining employee health and well being Partnership working with TUs Continue to maintain existing relations with TUs improving employee relations and overall employee experience Head of Personnel All managers across services March 2026 Within existing resources Annual review of employee wellbeing initiatives and campaigns to provide to improved supports and increase resilience of employees Supported, engaged, and motivated workforce Head of Personnel All managers across services March 2026 Within existing resources Promote employee recognition through appraisal Supported, engaged, and motivated workforce Head of Personnel All managers across services March 2026 Within existing resources 125
Page 126
126
Page 127
Report Agenda Item Report to: Finance and Corporate Resource Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Learning and Development Strategy 2025 to 2027 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide the Committee with an update on the Learning and Development Strategy for 2025 to 2027 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- [recs] (1) that the contents of this report be noted; and (2) that the Learning and Development Strategy 2025 to 2027, attached at Appendix 1, be approved. 3. Background 3.1. Work took place in 2019 to refresh the Learning and Development Strategy, however, the impacts of COVID-19 on learning and development were significant as the service had to adapt at pace to develop and enhance eLearning and other digital learning and development interventions. 3.2. The Learning and Development Service has continued to prioritise digital learning and has reviewed the current learning and development plan as part of the development of the new Learning and Development Strategy. This Strategy will align with key Council strategies and plans including the objectives set out in the Council Plan 2022 to 2027; the Workforce Strategy 2025-2027; the Council’s Digital Strategy 2022 to 2027; and Sustainable Development and Climate Change Strategy 2022 to 2027.. 3.3. A review exercise took place between January and March 2025 and included an analysis of the internal learning and development policy documents and the work of the Learning, Development and Workforce Planning Boards. In addition, the following external documents were considered:- Workforce Innovation – How Councils are Responding to Challenges, Best Value Thematic Work in South Lanarkshire Council, Audit Scotland June 2024 The Accounts Commission’s 2021 Digital Progress in Local Government The Local Government Overview 2023 The Scottish Government Digital Strategy Scotland’s Local Government Workforce Report 2024 by the Improvement Service 2023/2024 Annual Audit Report by Audit Scotland 11 127
Page 128
Essential Digital Skills Toolkit from the Scottish Council for Voluntary Organisations 3.4 A review has also commenced on the management and leadership development activities across the Council, a terms of reference has been created, and changes are planned to be implemented by December 2025. 4. Learning and Development Strategy 2025 to 2027 4.1. The strategy, included at Appendix 1, sets out the overarching vision for learning and development across the council, which is to: - “Improve the quality of services through developing and maximising the capabilities, skills and competencies of its workforce”. 4.2. This strategy introduces 6 strategic priorities that are proposed to be delivered during the life of the Strategy from 2025 to 2027. The priorities, which are detailed in full at section 6 of the Strategy, were identified from research that was undertaken into the aims and objectives and actions set out in key Council strategies and plans that have connections with learning and development, namely the Council Plan 2022 to 2027, the Workforce Strategy 2025 to 2027, the Digital Strategy 2022 to 2027, and the Sustainable Development and Climate Change Strategy 2022 to 2027. 4.3. Identification of the priorities in these plans was considered alongside national approaches and challenges identified from the publications listed at paragraph 3.3 of this report. Research was collated and the themes identified were translated into the following 6 priorities to take forward in the council’s learning and development strategy:- governance digital learning management and leadership development mandatory training vocational development grow our own 4.4. Section 8 of the Strategy includes an action plan showing a high-level timeline setting out when each of the priorities will be delivered. The following sets out the key strategic actions within the action plan: - 4.4.1. Digital learning In 2022, the Council conducted a workforce digital skills assessment that was developed using the Scottish Council for Voluntary Organisations’ Essential Digital Skills Toolkit. The assessment launched in 2018 and assessed access to digital and digital capability, and ranked people at either Foundation Level, which was the lower ranking, or Essential Level, which was the higher ranking. Between May and October 2022, a total of 2,178 employees across all Resources took part in the assessment. 4.4.2 The responses showed that in terms of digital access, 3% of respondents at that time did not have access to a digital device. In terms of capability, 10% of respondents were not operating at the lower Foundation Level. Since the 2022 digital skills survey, the council has continued to prioritise digital learning and will continue to assess the digital skills of its workforce in order to embed digital inclusion in its core service delivery to reduce digital exclusion and assist employees develop the required digital skills to support service modernisation. The inclusion of digital learning as a strategic priority in the council’s learning and development strategy will ensure it continues to 128
Page 129
assess and understand the digital skills of its workforce and that all training is designed and delivered to meet employee’s digital capabilities and needs. Inclusion of digital learning in this strategy also supports the action detailed in Audit Scotland’s Workforce Innovation report, which is repeated in the 2023/2024 Annual Audit Report “to develop an action plan to allow the council to monitor progress in addressing digital exclusion in its workforce”. 4.4.3. Governance To ensure robust governance arrangements continue to be in place and there is increased visibility around all Learning and Development activity, the following 2 actions are being taken forward:- Action 1: Evaluation - to ensure learning experiences are effective, continually improve for all and crucially, deliver the intended outputs, this strategy will focus on the evaluation element of the training cycle. The action is to develop an effective evaluation process that will be used across all learning and development activities to report on outputs and realised benefits, and participant satisfaction. Action 2: The Boards – the Learning, Development and Workforce Planning Boards are the primary mechanism used to identify, discuss and progress learning needs for each Resource. Accountable to the Executive Directors and chaired by a Head of Service, professional support is provided by Learning and Development Advisors. It is through the Boards the annual learning and development budgets are agreed and spend monitored. To ensure the Boards remain fit for purpose and meet organisational needs, a review has been incorporated into this strategy to appraise current outputs to ensure Governance arrangements for learning and development continue to be effective. 4.4.4. Grow our own Research shows that internal recruitment and movement of staff, providing the existing workforce with opportunities for promotion, employee development, and career transition supported through learning and development are approaches taken by many councils for filling vacancies. As such, some councils have developed ‘Grow Our Own’ (GOO) frameworks. South Lanarkshire Council has a GOO approach through its use of the modern and graduate apprenticeship pathways and the annual appraisal process. This is linked to employee development, through workforce and succession planning activities. The Council is also aligned to implementation of sector specific initiatives including the upskilling of employees in Waste Services to achieve their Light Goods Vehicle licence; and the Planning Service being involved in the first Young Planners course delivered by the University of the West of Scotland. 4.4.5 This Strategy sets out a commitment to develop an internal framework to use alongside workforce and succession planning activity, particularly for roles that are challenging to recruit and for those where future skills gaps have been identified. The framework will also align with the development of management and leadership programmes, apprenticeship programmes, and other vocational training opportunities which are also identified as strategic priorities in this strategy. 4.4.6. Management and Leadership Development The 2023/2024 Annual Audit Report - Audit Scotland outlines the Council’s management development programme that is in place to support succession planning and the leadership challenge programme which develops ‘rising stars’ and assist with succession planning. The overarching aim of the management and leadership programmes is to ensure managers at all levels have operational skills to 129
Page 130
manage at the respective level and to provide professional management and leadership opportunities to develop and enhance skills and knowledge, build resilience, and nurture leaders of the future. This Strategy commits to a review of all management and leadership programmes and sets out an action to incorporate a training needs analysis of managers to better understand the needs of managers at different levels in the organisation. Aligning to the strategic priority – Governance, any redesign will work in synergy with the council’s annual appraisal process, and an effective evaluation process will be built in to ensure training needs are identified appropriately, outputs are quantified, and impacts are measured and can reported on as part of the training cycle process. The overarching aim of redesigning the programmes is to support succession planning effectively, to provide managers with a suite of learning and development that addresses individual need whilst supporting organisation need, and a framework that fulfils the development of knowledge and skills in areas appropriate to grade. 4.4.7. Mandatory Training To mitigate risk to the Council and to ensure effective processes are in place, this strategy commits to reviewing and developing a corporate process around mandatory training. The process will also incorporate a route for new mandatory courses to be proposed in a way that enables the Council better governance over core mandatory training (training all employees should complete irrespective of their role). The Council’s Management and Leadership Development activities, will be better aligned to the induction process for managers and senior managers. A review will also take place of the core and role mandatory training (mandatory training specific to a role) incorporating these into the new management and leadership development programmes, ensuring all managers complete mandatory training consistently. 4.4.8. Vocational Development Research and the Council’s own workforce planning activity indicates an aging profile across councils as well as an ambition to support school leavers and young people into work. These ambitions are supported by national and local development initiatives, including apprenticeship programmes. Each year the Council is awarded an apprenticeship contract from Skills Development Scotland (SDS). The Vocational Development team then work with services who identify Modern Apprenticeship opportunities across key occupational groups (these are decided by the Scottish Government). In addition to Modern Apprenticeships, the contract is used to deliver Scottish Vocational Qualifications (SVQs) to existing staff. To support delivery of the Council’s Workforce Strategy 2025 to 2027, workforce and succession planning, and the achievement of the strategic priority – Grow Our Own, this Strategy sets out a commitment to review the current Modern Apprenticeship delivery model to assess its effectiveness as it is essential the Council is able to maximise the impact of the apprenticeship contract award by identifying future need across key occupational groups and recruit into those roles to allow training to take place in preparation for the future to avoid potential skills gaps. 4.5. It is acknowledged that in some cases there will be overlap across the strategic priorities, however, it is proposed that each of the strategic actions, shown in section 8 of the Strategy, will be developed and delivered as independent work plans with a clearly defined project plan that sets out the action(s), areas of responsibility, measures and specific timescales. 130
Page 131
4.6. The first strategic priority to be actioned is Management and Leadership Development. The action plan at section 8 of the strategy details the action(s), areas of responsibility, measures and specific timescales. 5. Challenges 5.1. Implementing a learning and development strategy across a large and diverse organisation is not without its challenges. Some challenges are being experienced at a local level whilst others are organisational issues for local government that require national actions as set out in the Improvement Service’s Scotland’s Local Government Workforce Report 2024. The council also needs to consider challenges identified in other strategies and plans it is delivering. The key challenges are set out at section 6 of the Strategy and are listed here:- financial pressures available funding digital exclusion support and buy-in from managers mainstreaming equalities 5.2. The Council is committed to providing equal access to learning and development opportunities to ensure all employees can acquire the necessary skills, knowledge and qualifications to carry out the duties of their post. The council will ensure all employees have equal access to learning and development by committing to ensure that opportunities are available at every step of peoples’ careers and are accessible to ensure the council builds a skilled, engaged and diverse workforce. 6. Monitoring and reporting 6.1. This Strategy is aligned to the Council planning cycle and will be reviewed in line with any revisions to the Council Plan and other relevant Council strategies and plans. The current Council Plan is due to be refreshed in 2027. 6.2. Each of the 6 strategic priorities contains one or more actions to deliver. Individual plans will be developed for each of these actions as set out in the action plan in section 8 of the strategy. Each action plan will be monitored and managed in line with internal reporting requirements for corporate management visibility, updates and approval. In addition to updating on the specific strategic priorities. 7. Employee Implications 7.1. There are no employee implications arising directly from this report. . 8. Financial Implications 8.1. There are no financial implications arising directly from this report. 9. Climate Change, Sustainability and Environmental Implications 9.1. There are no climate change, sustainability and environmental implications arising directly from this report. Subsequent reports focusing on the specific strategic priorities shown in the action plan at section 8 of this Strategy may have implications depending on any changes being proposed and these will be covered in those reports as required. 10. Other Implications 10.1. There are no other implications arising directly from this report. 131
Page 132
11. Integrated Impact Assessment and Consultation Requirements 11.1. There is no requirement for an integrated impact assessment in respect of this report. 11.2. The Trade Unions will be updated and involved in the Strategy Implementation. Jackie Taylor Executive Director (Finance and Corporate Resources) 7 August 2025 Link(s) to Council Values/Priorities/Outcomes Focused on people and their needs Working with and respecting others Accountable, effective, efficient, and transparent Ambitious, self-aware and improving Fair, open and sustainable Excellent Employer Previous References None List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Michelle Milne (Head of Personnel Services) Ext: 4330 (Tel: 01698 454330) Email: michelle.milne@southlanarkshire.gov.uk 132
Page 133
Appendix 1 Learning and Development Strategy 2025-2027 133
Page 134
Contents 1. Introduction ............................................................................................................. 4 2. Learning and development defined ..................................................................... 5 3. The Learning and Development Team ................................................................ 6 4. South Lanarkshire Council .................................................................................. 7 5. Strategic planning ................................................................................................ 8 6. Council challenges .............................................................................................. 9 7. Strategic Priorities ............................................................................................. 10 7.1. Digital learning ........................................................................................... 11 7.2. Governance ................................................................................................ 12 7.3. Grow our own ............................................................................................. 13 7.4. Management and leadership development ................................................ 13 7.5. Mandatory training ...................................................................................... 14 7.6. Vocational development ............................................................................. 15 8. Delivering the strategy ....................................................................................... 16 8.1. Action Plan 2025-27 ................................................................................... 17 9. Roles and responsibilities .................................................................................. 19 10. Monitoring and reporting ................................................................................ 20 134
Page 135
1. Introduction South Lanarkshire Council recognises that its employees are its greatest asset and that it will only be able to achieve its vision of improving the lives and prospects of everyone in South Lanarkshire with the support of a motivated, flexible and highly skilled workforce. It is, therefore, crucial that the council has in place a clear and robust learning and development strategy that supports the workforce to gain and maintain the required skills to carry out the broad range of functions delivered across the range of diverse council services, many of which are statutory. This learning and development strategy has, therefore, been developed in line with the Council Plan and other key council strategies, plans and activities and considered recommendations in external papers including the Workforce Innovation – How Councils are Responding to Challenges, Best Value Thematic Work in South Lanarkshire Council, Audit Scotland June 2024. As all services operate differently, development of this strategy considered the needs of individual services now and in the future as part of the council’s approach to workforce and succession planning, fundamentally where learning and development is critical in supporting council services plan and mitigate against future skills gaps to assist in building organisational resilience for the future. This strategy builds on the experience and good practice that has been present in South Lanarkshire Council and sets out six key priorities for 2025 – 2027 which are: - • Governance • Digital learning • Management and Leadership Development • Mandatory Training • Vocational Development • Grow Our Own This strategy sets out how the council will approach governance and mandatory training. These areas cut across other strategic priorities and encompass activities including how employees are welcomed and inducted in to and through the organisation; how the council ensures its workforce meets statutory and legislative training and development requirements; and how learning and development is evaluated effectively. The strategy sets out the requirement to review how mandatory learning and development is identified, communicated and completed. Mandatory Training also aligns to digital learning in terms of delivery, but also in how the council utilises its learning management system (LMS) to ensure all training is recorded and monitored, which is critical to ensure the council is meeting its legislative requirements particularly in roles that are regulated, or are a requirement of a professional body, for example, Scottish Social Services Council, General Teaching Council, and the Health and Safety Executive. Digital learning is a strategic priority in this strategy as the council is required to consider the impact digital transformation has and will have on how learning and development is undertaken. The Accounts Commission’s 2021 Digital Progress in Local Government report highlighted that Covid-19 accelerated the use of digital technology in councils, therefore, the council needed to innovate its use of technology and its approach to the development and delivery of learning and development. This resulted in a channel shift to digital learning that was implemented at pace. A digital approach to learning and development has remained the council’s 135
Page 136
preference, and taking cognisance of the Local Government Overview 2023 that forecasts the pivot to digital will continue, means the council must build upon the digital transformation work that has already taken place. This strategy, therefore, commits to an action to support the workforce develop the required digital skills to support service modernisation in line with the council’s Digital Strategy 2022-27. This learning and development strategy aids organisational resilient now and in the future by setting out how the council will introduce and promote opportunities to ‘Grow Our Own’. This approach builds on previous successes where sector specific initiatives have been implemented in areas where skills gaps have been identified through analysis of national trends and internal workforce and succession planning. This priority will align with other priorities including how the council delivers vocational development programmes going forward to ensure it is maximising opportunities across key occupational groups; how it approaches management and leadership development to ensure managers at all levels in the organisation have the capability, skills, and competence the organisation needs; and how it will develop inspirational leaders of the future. Developing and implementing this strategy is not without its challenges as council services work in a climate of workforce and financial pressures that impact the council in attracting, recruiting, and retaining staff. Two key challenges in delivering an effective learning and development strategy are budget and capacity, therefore, the council will be required to create innovative and forward-thinking solutions to overcome these challenges. Success in delivering this strategy will be achieved by continuing to work closely with Resources through Learning, Development and Workforce Planning Boards which ensure all learning and development activity is carried out in alignment with workforce and succession planning activity, Resource and service plans. The council is committed to providing equal access to appropriate learning and development opportunities to ensure all employees can acquire the necessary skills, knowledge and qualifications to carry out the duties of their post. The council will ensure all employees have equal access to learning, development, and career progressions by setting out a commitment in this strategy to ensure that learning and development opportunities are available at every step of peoples’ careers and that there are no barriers to ensure the council builds a skilled, engaged and diverse workforce, investing in people development and strengthening the council’s capability to deliver improved service. 2. Learning and development defined Learning and development refers to a systematic process aimed at improving the skills, knowledge and competence of the workforce. Each has a different aim and, therefore, can be defined differently: - • Learning: the acquisition of new knowledge and/or skills through a range of methods such as formal training or on-the-job training. • Development: longer term growth and career progression through activities such as coaching, mentoring, leadership development and continuous professional development. For the purposes of this strategy, learning and development and training are terms that are used interchangeably to include any or a combination of the following: - 136
Page 137
• activities • coaching • continued professional development • digital based learning • events • further/higher education • internal and external training courses • leadership development • management development • practitioner forums • mentoring • on the job/ experiential learning • secondments • seminars • shadowing • toolbox talks and team briefs • virtual/ online sessions • vocational qualifications • workshops 3. The Learning and Development Team The council’s Learning and Development team consists of skilled professionals who respond to the learning and development needs of the organisation. A wide range of people development interventions are provided within the team who deliver solutions flexibly including in-person, eLearning and blended learning that considers best value and sustainability whilst being accessible for all. The team, who have responsibility as learning and development leads across each of the council’s five Resources, work across the following keys areas: Corporate Training Team - responsible for a broad range of corporate training for employees and managers including Fusion systems training, management and leadership development, employee relations training, soft skills training such as managing teams, presentation skills, having challenging conversations, and coaching. The team are also responsible for the annual Elected Member Training Needs Analysis process. eLearning Development Team - working across Resources in conjunction with subject matter experts, the team design, build, and maintain all of the council’s eLearning courses. Health and Safety Training Team - responsible for related training including First Aid; Driving Standards Agency accredited drivers Certificate of Professional Competence; driving assessments and a range of driver safety training; REHIS accredited food hygiene training; mental health training; and a broad range of practical training and assessments to ensure employees know how to use work- related equipment safely including ladder safety, harness safety and alloy towers. Social Work training team - responsible for related training across Adult Services; Children, Families and Justice Services; and Trauma Informed Practice. The team deliver the induction programme for new employees, training for newly qualified Social Workers, and a wide range of training for existing employees including dementia training, delivery of the Multi-Agency Risk Assessment Conference (MARAC) agenda, delivery of the Multi-Agency Public Protection Agenda (MAPPA), and a range of mental health services training. The team are also lead trainers for the Promoting Positive Behaviour (PPB) course. Learning and Development Administration Team – responsible for supporting Resources to scope annual training needs, arranging internal training and procuring external training, managing a range of accredited training programmes, maintaining accurate training matrices and training records in Fusion Learn, administering training budget spend, providing a range of reports for managers, 137
Page 138
and being the main contact between employees and the Learning and Development Team. Vocational Development Team – responsible for delivering the council’s Modern Apprenticeship programme across a range of disciplines and for delivering Scottish Vocational Qualifications to existing employees as part of regulatory requirements and to support succession planning. Clyde Valley Learning and Development Group (CVLDG) – as the lead authority, South Lanarkshire Council is responsible for the management, governance and effective delivery of the CVLDG workplan and associated sub-groups; these are the eLearning group, Social Care group, Promoting Positive Behaviour (PPB) governance groups and Chartered Management Institute (CMI) group. The council also has responsibility for all associated procurement exercises, managing the budget, and producing relevant reports for the Joint Committee and PPB strategic governance group. The Learning and Development team also undertake bespoke training delivery in response to specific requests, and this is fulfilled where the team have professional knowledge in that area, for example, bespoke training to support Elected Members use Fusion was created and delivered by the Corporate Training team. In situations where the team are not subject matter experts, learning needs can be discussed through the Learning, Development and Workforce Planning Boards to review requirements and budget and, where it is known to the team, advice can be provided on relevant training the council could potentially procure externally. Where learning and development is procured at a cost to the council, the team can advise on whether employees undertaking the course of study would be subject to a letter of undertaking (LoU). This is an agreement between an employee and South Lanarkshire Council that mitigates against potential financial loss to the council where an employee has received financial assistance to complete a course of study that subsequently ceases to be of benefit to the organisation. This may happen if an employee fails to complete the requisite course of study, fails to make sufficient progress, or ends their employment with the council before the beneficial effect of the transfer of learning has occurred. 4. South Lanarkshire Council South Lanarkshire is a diverse area covering 177,405 hectares of varied geographical territory and takes in rural and upland areas. It is the fifth largest council area in Scotland with a population of 320,000 a working age population of 203,000 and around 145,000 households who live in the suburban towns, rural towns and villages. The council employs in the region of 17,086 employees across five Resources who deliver a wide range of services that touch all communities and every household in South Lanarkshire. Each of the following five Resources is tasked with delivering the key priority objectives of the Council: • Community and Enterprise Resources • Education Resources • Finance and Corporate Resources • Housing and Technical Services Resources • Social Work Resources 138
Page 139
At the heart of the council’s vision are values based on fairness, empathy and a commitment to make a difference to the lives of residents and communities. The council’s values express a determination to be ambitious for South Lanarkshire and to be a high performing and high achieving council fully committed to building a strong future workforce to support the delivery of services to the communities who need them most. South Lanarkshire Council’s Plan 2022-27, Connect, shown in the following diagram, explains how the council will achieve this across all five Resources by setting out the vision, key priorities and objectives for the council. Diagram 1: the council plan on a page 2022-27 5. Strategic planning The Council Plan and Resource plans provide the context to determining what affects the future shape of the workforce, the skill set of the current workforce and what skills will be needed in the future. Resource plans include key areas of focus, outcomes, measures, actions, and detail how the plans will be resourced. Resources also develop learning and development plans, which are agreed annually through the council’s Learning, Development and Workforce Planning Boards for each of the Resource. The function of the Boards is to act as a mechanism for the identification of training needs and to ensure that learning and development budgets are monitored. This strategy also took cognisance of the council’s Digital Strategy 2022-27, which is aligned with the Scottish Government Digital Strategy. This is an important area that the Learning and Development strategy has incorporated particularly around some of the key principles in the council’s Digital Strategy which translates to employees 139
Page 140
alongside citizens. Two key principles considered in the development of this strategy include ‘Digital first’ and ‘Digital inclusion’. These two principles consider how learning and development is designed and delivered, and how employees are supported to adapt to digital learning, digital ways of working, and a constantly evolving digital world. This strategy has been developed to support and compliment the council’s Workforce Strategy 2025-27. The workforce strategy will ensure the council has effective workforce planning arrangements to achieve the right number of people, with the right skills, in the right place, at the right time to support, maintain and develop the provision of high quality, responsive services. This learning and development strategy sets out the key priorities that will support the workforce strategy by focusing on key priority areas that will aid the council attract, train and retain a skilled workforce. This strategy aims to attract employees through vocational development programmes; train employees across a wide range of subject area and retain skilled employees by adopting a ‘Grow Our Own’ model, and offers career progression from modern through to graduate apprenticeships, supported by comprehensive management and leadership development programmes. 6. Council challenges Implementing a learning and development strategy across a large and diverse organisation is not without its challenges. Some challenges are being experienced at a local level whilst others are organisational issues for local government that require national actions as set out in the Improvement Service’s Scotland’s Local Government Workforce Report 2024. The council also needs to consider challenges identified in other strategies and plans it is delivering. Local and national challenges impacting the council deliver the learning and development strategy include the following: - Diagram 2: Strategic learning and development challenges • Financial pressures: the local government workforce report identifies 94% of local authorities face financial pressures to workforce planning. The council continues to deliver services with reduced financial resources; therefore, the Learning, Development and Workforce Planning Boards play a key role in ensuring the effective management of learning and development budgets and will be reviewed as part of this strategy to ensure they remain fit for purpose. Delivering the strategy Financial pressure s Funding Manager buy-in and support Main- streamin g equalities Digital skills 140
Page 141
• Funding: the local government workforce report states that 88% of local authorities identified wider funding for development and ‘Grow our own’ initiatives as a barrier to addressing skills gaps. This is a potential barrier for the council and therefore ‘Grow our own’ and vocational development programmes feature as one of the strategic priorities in this strategy. • Managers buy-in and support: The local government workforce report indicates 41% of local authorities have experienced Manager buy-in and support as a barrier to workforce planning activity, for example, capacity within services can lead to a difficult balance between time to complete training and continuity of service delivery. This can also have a consequential impact on learning and development budgets where training is committed then subsequently not attended. For this strategy to succeed full organisational support is required and therefore section 9 of this strategy sets out the various roles and responsibilities required to deliver the strategy successfully. • Mainstreaming Equalities: The council is committed to reducing inequality in its communities and this will be reflected in its workforce activities. This is evidenced by the Council’s Mainstreaming Equalities Report 2025-29, which highlights the Councils progress towards the 2021 equality outcomes, sets out the new equality outcomes for the next 4-years, and includes details of the diversity of the workforce, including training data by protected characteristic. • Digital skills: The council’s digital strategy is targeted at improving the effectiveness and efficiency of council services through its use of digital and ICT services and going forward the benefits of artificial intelligence. This strategy requires a digitally skilled workforce aligned to the needs of the council and is aimed at increasing digital inclusion to enable the workforce to be equipped to operate in a digital age. 7. Strategic Priorities The council’s Learning and Development Strategy is a medium-term plan that sets out the council’s approach to learning and development from 2025 to 2027. The aim of this strategy is to: - “Improve the quality of services through developing and maximising the capabilities, skills and competencies of its workforce”. The strategy will be delivered across six priorities that take cognisance of wider council strategies and plans. An action plan is included at section 8 of the strategy and provides a timeline for delivery and details how the identified outcomes will be measured. 141
Page 142
Diagram 3: Strategic Priorities 2025-2027 7.1. Digital learning Since 2020 there has been significant and successful channel shift from in-person training delivery to various forms of digital learning. Digital learning encompasses eLearning courses, online demos, webinars, and recorded sessions. The council has in place the Oracle Fusion platform which contains the Learning Management System (LMS) used for learning and development activity. The LMS is referred to as Fusion Learn and has the following functions: - • Access to all eLearning courses • Request and book on to instructor led in-person courses • View joining instructions and course information • Storage of employee training records • Management information The LMS was implemented in August 2024 and continues to be explored in terms of potential additional functionality. As the capabilities of the LMS are understood, further developments and enhancements to processes may be possible to implement in the future, for example, functionality around how training is recorded and how that process fits with the strategic priority – Mandatory Training - can be explored and tested. The LMS is also subject to regular updates that may provide opportunities in the future, which will be considered as part of the action plan to support, develop and equip the workforce with the required digital skills to deliver effective services, and to support service modernisation in line with the digital strategy. Channel shifting to digital learning provides benefits to the council, for example, it enables the council to deliver cost effective location neutral training, this supports the council to deliver on its Sustainable Development and Climate Change Strategy 2022 to 2027. Since 2020 the council has continued to promote digital learning. In 2022 the council conducted a workforce digital skills assessment that was developed using the Scottish Council for Voluntary Organisations’ (SCVO) Essential Digital Skills Toolkit. The assessment launched in 2018 and assessed access to digital and digital capability, and ranked people at either Foundation Level, which was the lower ranking, or Essential Level, which was the higher ranking. Between May and October 142
Page 143
2022, a total of 2,178 employees across all Resources took part. The responses showed that in terms of digital access, 3% of respondents at that time did not have access to a digital device. In terms of capability, 10% of respondents were not yet operating at yet operating at the lower Foundation Level. Since the 2022 digital skills survey, the council has continued to prioritise digital learning therefore it must ensure it continues to assess the digital skills of its workforce in order to embed digital inclusion in its core service delivery to reduce digital exclusion and assist employees develop the required digital skills to support service modernisation. The inclusion of digital learning as a strategic priority in the council’s learning and development strategy supports the digital first principle set out in the council’s Digital Strategy and will ensure the council continues to assess and understand the digital skills of its workforce and that all training is designed and delivered to meet employee’s digital capabilities and needs. Inclusion of digital learning in this strategy also supports the action detailed in Audit Scotland’s Workforce Innovation report, which is repeated in the 2023/24 Annual Audit Report “to develop an action plan to allow the council to monitor progress in addressing digital exclusion in its workforce”. The SCVO continue to offer support to organisations to reduce digital exclusion of the workforce, and this will considered as along with The Accounts Commission’s 2021 Digital Progress in Local Government report, the Scottish Government Digital Strategy, and in collaboration with the Council’s Information Technology Services. 7.2. Governance Governance is a strategic priority that over the next 2-years will focus on the following two keys areas: - a) Effective evaluation of learning and development activity Learning and development is the ability to understand learning needs, develop learning strategies and approaches, design learning programmes and content, and deliver training through various methods to enhance knowledge, skills and competence in line with organisational outcomes. To achieve this the council’s learning and development team apply the training cycle. Diagram 4: The training cycle To ensure learning experiences are effective, continually improve for all and crucially, deliver the intended outputs, this strategy will focus on the evaluation element of the training cycle. The action is to develop an effective evaluation Identify training needs Design the training Deliver the training Evaluate the training 143
Page 144
process that will be used across all learning and development activities and can be used for reporting not only satisfaction with the learning activities to report on outputs and realised benefits, and participant satisfaction. b) Learning, development and workforce planning board review The Learning, Development and Workforce Planning Boards are the primary mechanism used to identify, discuss and progress learning needs for each Resource. The Boards are accountable to the Executive Directors and are chaired by a Head of Service. Professional support is provided by Learning and Development Advisors who support the Chair, provide information and reports as necessary, and ensure continuity and consistency across the Resources. It is through the Boards the annual learning and development budgets are agreed and spend monitored. To ensure the Boards remain fit for purpose, a review has been incorporated into this strategy to appraise current outputs to ensure governance arrangements for learning and development continue to be effective. 7.3. Grow our own The Local Government Information Unit (LGiU) explain that internal recruitment and movement of staff, providing the existing workforce with opportunities for promotion, employee development, and career transition supported through learning and development are approaches taken by many councils for filling vacancies. As such, some councils have developed ‘Grow Our Own’ (GOO) frameworks. South Lanarkshire Council has begun to adopt a GOO approach through its use of the modern and graduate apprenticeship pathways; through the annual appraisal process, which is linked to employee development; through workforce and succession planning, which aim to identify and mitigate critical skills gaps; and also through the implementation of sector specific initiative including the upskilling of employees in Waste Services to achieve their Light Goods Vehicle licence; and the Planning Service being involved in the first Young Planners course delivered by the University of the West of Scotland. The council is also keen to explore a new Graduate Apprenticeship programme that is currently being developed for Social Work. As the approach to GOO is in its infancy, this strategy sets out a commitment to work with Resources to develop an internal framework to use alongside workforce and succession planning activity, particularly for roles that are challenging to recruit and for those where future skills gaps have been identified. The model will also align with the development of management and leadership programmes, apprenticeship programmes, and other vocational training opportunities which are also identified as strategic priorities in this strategy. 7.4. Management and leadership development The 2023/24 Annual Audit Report - Audit Scotland outlines the council’s management development programme that is in place to support succession planning and the leadership challenge programme that develops ‘rising stars’ and assist with succession planning. The current programme consists of three levels of management development and a leadership programme entitled the ‘Leadership Challenge’ as follows: - Programme name Applicable grades Programme suitability Ambition Grades 1 - 2 Supervisor (entry level) 144
Page 145
Consolidation Grades 2 - 3 First Line Manager Development Grades 3 - 4 Management development Leadership Challenge Grade 5 and above (Grade 4 by exception) Aspiring senior leaders , The overarching aim of the management and leadership programmes is to ensure managers at all levels have operational skills to manage at the respective level and to provide professional management and leadership opportunities to develop and enhance skills and knowledge, build resilience, and nurture leaders of the future. This strategy commits to a review of all four programmes and sets out an action to incorporate a training needs analysis of managers to better understand the needs of managers at different levels in the organisation. Aligning to the strategic priority – Governance, any redesign will work in synergy with the council’s annual appraisal process, and an effective evaluation process will be built in to ensure training needs are identified appropriately, outputs are quantified, and impacts are measured and can reported on as part of the training cycle process. The overarching aim of redesigning the programmes is to support succession planning effectively, to provide managers with a suite of learning and development that addresses individual need whilst supporting organisation need, and a framework that fulfils the development of knowledge and skills in areas appropriate to grade across the following areas: – • operational management: day-to-day activities such as health and safety, human resources, finance, project management, and procurement. • strategic management: corporate level situational analysis, strategy development, change management, and evaluation. • leadership capabilities: develop skills and behaviours that enable an individual to engage, inspire and lead others towards the organisation’s goals. 7.5. Mandatory training The Learning and Development team support the council deliver a range of mandatory training some of which is a statutory or legislative requirement the council must fulfil, such as health and safety courses delivered in-house by the Health and Safety Training team. Most of this training is a requirement of certain roles which could not be carried out without completion of relevant courses of study. Mandatory training can also be training that is developed as necessary to protect the council, its employees, and the public, for example, Integrated Impact Assessment training is not a statutory requirement, but can help mitigate potential risk across a range of statutory and non-statutory public duties. For the purpose of this strategy mandatory training is categorised as core mandatory or role mandatory, for example: • Core mandatory training is for all employees to complete whether it is a statutory requirement or not. Core mandatory training will form part of the new starter induction process, however, there may also be situations when core mandatory training will be required to be completed by existing employees, for example, if the content of a core mandatory course that has previously been completed is updated. 145
Page 146
• Role mandatory training is only mandatory for certain job roles and will be defined through training records for each relevant service and will form part of each employee’s individual development plan. Some role mandatory training may also be statutory. To ensure effective processes are in place, this strategy commits to reviewing and developing a corporate process around mandatory training. Currently core mandatory training is not easily identifiable therefore the new process will incorporate clear communication of core mandatory training and, predicated on future Fusion Learn capabilities, will aim to provide managers the ability to monitor their team’s completion rates. The process will also incorporate a route for new mandatory courses to be proposed in a way that enables the Corporate Management Team improved governance over core mandatory training requests. Role mandatory training covers a broad range of subject areas, for example, courses in first aid, driver safety training, food hygiene, plant and equipment training, and a range of social care related training. The Learning and Development Administration Team will continue to manage the wide range of role mandatory training that is undertaken across Resources through effective administration of training matrices that were developed prior to the Fusion launch. The review will also align with the strategic priority – Management and Leadership Development, with an outcome of both reviews being the development of induction programmes that ensure all managers have completed the required mandatory training regardless of whether they are new to the council or an existing manager. 7.6. Vocational development The LGiU have stated that the aging profile of council workforces and the desire to support school leavers and young people into work is behind the development of various initiatives including apprenticeship programmes. South Lanarkshire Council currently operates three apprenticeship pathways which are Foundation, Modern and Graduate Apprenticeships. The Foundation Apprenticeship programme aligns with education and is delivered through Community and Enterprise Resources. The Modern and Graduate Apprenticeship programmes are delivered by the council’s Vocational Development team within Finance and Corporate Resources. Each year the council is awarded a modern apprenticeship contract from Skills Development Scotland. The Vocational Development team work with services who identify Modern Apprenticeship opportunities across key occupational groups, which are decided by Scottish Government. In addition to Modern Apprenticeships, the contract can be used to deliver Scottish Vocational Qualifications (SVQs) to existing staff. For example, some of these places are used in Social Work to upskill homecare to SVQ level 3 which is a requirement of the role. To support delivery of the council’s Workforce Strategy 2025-27, workforce and succession planning, and the achievement of the strategic priority – Grow Our Own, this strategy sets out a commitment to review the current Modern Apprenticeship delivery model to assess its effectiveness as it is essential the council is able to maximise the impact of the apprenticeship contract award by identifying future need across key occupational groups, and recruit into those roles to allow training to take place in preparation for the future to avoid potential skills gaps. 146
Page 147
8. Delivering the strategy The following action plan sets out the individual strategic priorities, the individual actions that will be completed to deliver this strategy, who has responsible to deliver the plans, how actions will be measured and a high-level timeline. 147
Page 148
8.1. Action Plan 2025-27 Strategic priority Actions Responsibility Measures 2025 2026 2027 Digital Learning Support, develop, and equip the workforce with the required digital skills to deliver services effectively and to support service modernisation in line with the Digital Strategy. Learning and Development Team IT Team Managers Employees • Feedback from digital skills survey and focus groups. • Evaluation of pre and post learning scores • Case studies highlighting digital skills progression within and across teams. Governance Review the current Learning, Development and Workforce Planning Boards to determine if they remain fit for purpose and, where any opportunity for change is identified, propose change. Learning and Development Team Learning, Development and Workforce Planning Boards • Feedback from consultations • If changes are identified, new approaches will be successfully implemented as planned. Governance Ensure any training delivered meets the needs of employees and services by ensuring there is a robust evaluation process in place. Learning and Development Team Employees • Effective implementation of the training cycle • Feedback from evaluations • Training enhanced through applying feedback • Case studies demonstrating the transfer of learning to the workplace. Grow Our Own Identify and mitigate any critical skills gaps in the future by aligning the learning and development strategy with Resource plans, workforce and succession plans. Learning and Development Team Learning, Development and Workforce Planning Boards • Identify and mitigate any critical skills gaps in the future by aligning the learning and development strategy with the Workforce Strategy to ensure services effectively succession plan. 148
Page 149
Strategic priority Actions Responsibility Measures 2025 2026 2027 Management and Leadership Development Review and refresh current management and leadership development programmes to meet the needs of managers at all levels within the organisation. Learning and Development Team All managers • Management survey feedback • New programmes developed and launched • Programme evaluations • Succession planning effectiveness • Case studies and testimonials Mandatory Training Review and refresh current approach to mandatory learning – this includes processes around identification, requesting learning to be mandatory, delivering, administering and recording, and reporting on courses. The refresh will align to induction and management development. Learning and Development Team CMT All managers All employees • Suite of mandatory learning defined • Process in place for new requests for learning to be mandatory • Manager will have identified role mandatory learning • Role mandatory learning will be recorded in Fusion Vocational Development Review the current delivery model for modern apprenticeships and SVQs to propose an alternative model that better supports Resources workforce and succession plans and delivers best value for the council. Learning and Development Team CMT Key services • New model identified and proposal to implement approved • Feedback from key stakeholders inducing services and apprentices • Case studies demonstrating success in the areas highlighted as benefits, such as, new model supporting succession planning and increased intake numbers 149
Page 150
9. Roles and responsibilities In addition to the responsibilities noted in the action plan at section 8, this strategy requires full organisational support to succeed, therefore key roles and responsibilities are highlighted as follows: - Executive Directors • Demonstrate a positive approach towards employee development by being an ambassador of learning and development • Ensure equity of access to learning and development • Take cognisance of learning and development requirements in Resource planning and budget planning • Be visible and active participants in management and leadership development opportunities Heads of Service, Managers and Supervisors • Demonstrate a positive approach towards employee development by being an ambassador of learning and development • Take ownership of the Learning, Development and Workforce Planning Boards as nominated Chair and for others as active participants • Contribute to the compilation of the annual Resource learning and development plans • Identify team and individual training needs • Seek advice on team and individual training needs from Learning and Development Advisors • Ensure employees are aware of the learning objectives of any training and development arranged • Support the employee complete any prerequisite tasks • Provide time to attend learning and development activities • Support the course evaluation process • Ensure employee training records are kept up to date Learning and Development Team • Lead on the development and delivery of the council’s Learning and Development Strategy • Promote a positive approach to employee development • Be first point of contact for all learning and development enquiries • Take an active role in the Learning, Development and Workforce Planning Boards including supporting the Chair, providing professional learning and development related guidance, managing the agenda and the minute, and providing corporate input • Support the development of Resource learning and development plans • Support the effective management of learning and development budgets • Provide professional guidance to managers on appropriate interventions • Deliver specific programmes • Author eLearning courses • Procure required external training • Manage training matrices and training records in regard to statutory and mandatory training requirements • Support the ongoing development of Fusion Learn 150
Page 151
Employees • Take responsibility for reviewing and improving their own performance • Agree with their line manager the best delivery method to match their preferred learning style • Participate fully and positively in any activity • Contribute to the council’s evaluation activities by completing requisite feedback forms • Reflect on how learning will transfer into day-to-day work • Share new knowledge and skills with others • Take responsibility for future career development and progression • Ensure their learning and development records are keep up to date 10. Monitoring and reporting This strategy is aligned to the council planning cycle and will be reviewed in line with any revisions to the Council Plan and other relevant council strategies and plans. The current council plan is due to be refreshed in 2027. Each of the six strategic priorities contains one or more actions to deliver. Individual plans will therefore be developed for each action. Each action plan will be monitored and managed in line with internal reporting requirements for corporate management visibility, updates and approval. In addition to updating on the specific strategic priorities, it is proposed to provide the Corporate Management Team with an annual update on the Learning and Development Strategy 2025-2027 in May 2026, and in May 2027. 151
Page 152
152
Page 153
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Prudential Indicators, Treasury Management Activity and Annual Investment Report 2024/2025 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] provide an overview of the Treasury Management Activity and Prudential Code Indicators for 2024/2025 allow the Committee to scrutinise the proposed Annual Investment Report for 2024/2025 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- [recs] (1) that the Treasury Management Activity Report for 2024/2025 (section 4 and Appendix 1), be noted; (2) that the 2024/2025 Treasury Management and Prudential Code Indicators (section 5 and Appendix 2), be noted; (3) that the Treasury Management Activity Report (Appendix 1) and the Treasury Management and Prudential Indicators (Appendix 2) be referred to the Executive Committee for noting; (4) that the 2024/2025 Annual Investment Report (Appendix 3) be endorsed; and (5) that the 2024/2025 Annual Investment Report (Appendix 3) be referred to the Executive Committee prior to submission to the Council for formal approval in line with The Local Government Investments (Scotland) Regulations 2010. 3. Background 3.1. The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of Practice for Treasury Management requires councils to prepare an annual report on their Treasury Management Activities. The report covering the Council’s Treasury Management Activity during 2024/2025 is summarised in Section 4 of the report and provided in detail in Appendix 1. 3.2. The Council’s capital programme is partly funded by planned borrowing. The CIPFA Prudential Code provides a framework to assist the management of the financial implications of borrowing and helps to demonstrate that the borrowing is both affordable and prudent. The Code requires councils to prepare a series of financial indicators that demonstrate affordability, prudence and sustainability with regard to capital financing decisions. 12 153
Page 154
3.3. Estimates of these indicators are reported to the Finance and Corporate Resources Committee at the start of each year, with selected indicators then reported on an actual basis at the end of the year. The year end indicators for 2024/2025 are noted in Section 5 of the report and detailed in Appendix 2. 3.4. The Local Government Investments (Scotland) Regulations 2010 require local authorities to prepare an Annual Investment Strategy before the start of the financial year and an Annual Investment Report after the financial year end. Both documents are required to be approved by full Council. 3.5. The Annual Investment Report for 2024/2025 is summarised in Section 6 of this report with the detail in Appendix 3. 3.6. The Annual Investment Strategy for 2024/2025, approved in February 2024, recognised that any investment activity carries an element of risk. Appendix 4 details the investments that the Council were permitted to use in 2024/2025, the associated risks and the controls and limits that were put in place to mitigate these risks. 3.7. The figures contained within this report are taken or calculated from South Lanarkshire Council’s Annual Accounts for 2024/2025. 4. Treasury Management Activity 2024/2025 4.1. Appendix 1 details the Treasury Management Activity for 2024/2025. 4.2. The Council ended the year with borrowing of £1,030.762m with fixed rate loans from the Public Works Loans Board (PWLB) making up 94.32% of the debt. Fixed rate loans help to build in certainty to the calculation of future loan charges which forms a significant element of the Council’s long term Revenue Budget Strategy. 4.3. The Council’s pooled interest rate for 2024/2025 was 4.22% (4.12% in 2022/2023), with an expenses rate of 0.06%. The overall cost of borrowing will increase as debt levels increase to fund the capital programme. 4.4. Total deposits at the end of the year totalled £23.582m with the level varying throughout the year due to the timing of expenditure and receipts. 4.5. During 2024/2025, the Council placed £1,790.422m of deposits on a cumulative basis. All deposits made by the Council were in line with approved lending limits and credit rating criteria. The level of investment return was £3.657m. 5. Treasury Management and Prudential Code Indicators – 2024/2025 5.1. The Council is required by the Prudential Code to report the actual prudential indicators after the closure of the financial year. Appendix 2 details the indicators for 2024/2025. 5.2. The General Fund Capital Expenditure for 2024/2025 was £41.928m which is £27.904m less than estimated in the Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy report presented to South Lanarkshire Council in February 2025. The details of this have been reported to the Executive Committee over recent months, with a final position being reported on 25 June 2025. 154
Page 155
5.3. The Housing Revenue Account (HRA) Capital Expenditure in 2024/2025 was £71.544m which is £1.754m less than the estimate reported to South Lanarkshire Council in February 2025. The details of this have been reported to the Executive Committee over recent months, with a final position being reported on 25 June 2025. 5.4. The Council’s gross borrowing position for 2024/2025 was £1,354.017. This consists of external borrowing of £1,030.762m and the Public Private Partnership (PPP) Finance Lease Liability of £323.255m. Gross borrowing is less than the capital financing requirement of £1,591.685m due to the fact that no long-term borrowing was taken during 2024/2025. 5.5. The Council used its significant cash balances available in lieu of the remainder of its borrowing requirement for the year. Borrowing before cash was required would incur a cost of carry as the interest rates achievable on deposits continue to be less than the interest rates on borrowing. 5.6. By not taking any long-term borrowing during 2024/2025, interest costs for 2024/2025 were reduced and savings from this used to support the Revenue Budget Strategy going forward. 5.7. The Capital Financing Requirement for the General Fund is £154.954m higher than forecast and for HRA is £1.855m lower than forecast. For the General Fund this is due to the introduction of a new accounting standard (IFRS16) which changes how the Council accounts for leases. This resulted in a remeasurement of lease liabilities. This was unable to be quantified at the time the estimates were calculated. 5.8. This is purely an accounting treatment, has no impact on the General Fund balance and does not require the Council to take any additional borrowing. 5.9. For the HRA this is due to changes in the borrowing required to fund the capital programme reflecting the timing of expenditure and movements in other sources of funding. 5.10. One indicator covers borrowing and sets limits on the level of borrowing that the Council can have: The Operational Limit for External Debt is the expected borrowing position, but it can vary due to changes in the cash flow and temporary breaches are acceptable. In contrast, the Authorised Limit for External Debt represents the maximum level of debt the Council can afford and should not be breached. The Council remained within both the Operational and Authorised Limit for External Debt during 2024/2025. 6. Annual Investment Report – 2024/2025 6.1. The Council is required by The Local Government Investments (Scotland) Regulations 2010 to prepare an Annual Investment Report after the financial year end. The Annual Investment Report for financial year 2024/2025 is detailed in Appendix 3 and summarised below. 155
Page 156
6.2. During 2024/2025, the Council placed £1,790.422m of deposits on a cumulative basis. All deposits made by the Council were in line with approved lending limits and credit rating criteria. £1,701.875m (95.05%) of deposits were made with counterparties of very high credit quality (UK Government – Debt Management Account Deposit Facility (DMADF), and other local authorities). The remaining £88.547m (4.95%) was deposited in an instant access call account with Bank of Scotland. 6.3. In order to manage liquidity risk the Council held an average of £7.837m in bank accounts with instant access. 6.4. No borrowing in advance was taken during 2024/2025. 7. Employee Implications 7.1. None 8. Financial Implications 8.1. The financial impact from treasury activity and borrowing for capital expenditure has been built into the long-term Revenue Budget Strategy. 8.2. In 2024/2025 the amounts charged to the General Fund in relation to debt (loan charges) totalled £42.001m. HRA loan charges totalled £12.468m. These costs were met from within approved Revenue Budgets. 9. Climate Change, Sustainability and Environmental Implications 9.1. There are no implications for climate change or sustainability in terms of the information contained in this report. 9.2. There is also no requirement to carry out an environmental impact assessment in terms of the information contained within this report. 10. Other Implications 10.1. South Lanarkshire Council recognises that any Treasury Management Activity will carry an element of risk. It is important that risk is identified and controls put in place to limit those risks. 10.2. The Council has complied with all of the relevant statutory and regulatory requirements which limit the levels of risk associated with its treasury management activities. In particular, its adoption and implementation of both the Prudential Code and the CIPFA Treasury Management Code of Practice means both that its capital expenditure is prudent, affordable and sustainable, and its treasury practices demonstrate a low-risk approach. 10.3. The CIPFA Treasury Management Code of Practice adopted by the Council, places Credit and Counterparty risk at the forefront of treasury risks. 10.4. South Lanarkshire Council recognises that any investment activity will carry an element of risk. It is important that risk is identified and controls put in place to limit and manage those risks. 156
Page 157
10.5. Appendix 4 to this report details the investments that the Council was permitted to use in 2024/2025, the associated risks and the controls and limits that were put in place to mitigate these risks. 11. Integrated Impact Assessment and Consultation Requirements 11.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 11.2. There is no requirement to undertake any consultation in relation to the content of the report. Jackie Taylor Executive Director (Finance and Corporate Resources) 20 August 2025 Link(s) to Council Values/Priorities/Outcomes Value: Accountable, effective, efficient and transparent Previous References Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy 2024/2025, South Lanarkshire Council, 21 February 2024 Treasury Management Activity – 2024/2025 Third Quarter Review, Finance and Corporate Resources Committee, 29 January 2025 List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Lorraine O’Hagan, Head of Finance (Strategy) Ext: 2601 (Tel: 01698 452601) E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 157
Page 158
Appendix 1 Treasury Management Activity Report 2024/2025 1. Background 1.1. The Annual Treasury Management Activity Report is a requirement of the Council’s reporting procedures and covers 2024/2025. The report also includes the Treasury Management Indicators for 2024/2025 in accordance with the requirements of the CIPFA Code of Practice for Treasury Management in the Public Sector and actual Prudential Indicators for 2024/2025 in accordance with the requirements of the Prudential Code. 2. Introduction 2.1. The Council’s treasury management activities are regulated by a variety of professional codes and statutes and guidance: 2.2. The Local Government in Scotland Act 2003 (the Act), which provides the powers to borrow and invest as well as providing controls and limits on this activity; ▪ The Act permits the Scottish Ministers to set limits either on the Council or nationally on all local authorities restricting the amount of borrowing which may be undertaken (although no restrictions were made in 2009/10); ▪ Statutory Instrument (SSI) 29 2004, requires the Council to undertake any borrowing activity with regard to the CIPFA Prudential Code for Capital Finance in Local Authorities, and therefore to operate the overall treasury function with regard to the CIPFA Code of Practice for Treasury Management in the Public Services; ▪ This Council has adopted the CIPFA Code of Practice for Treasury Management in the Public Sector and operates its treasury management service in compliance with this Code and the above requirements. These require that the prime objective of treasury management activity is the effective management of risk, and that its borrowing activities are undertaken in a prudent, affordable and sustainable basis. 2.3. The CIPFA Code of Practice requires reports to be made on its treasury management policies, practices and activities, including, as a minimum, an annual strategy and plan in advance of the year, a mid-year review and an annual report after its close. 2.4. This report will cover: ▪ A summary of the strategy agreed for 2024/2025; ▪ The Council’s treasury position at 31 March 2025; ▪ Economic Background for 2024/2025; ▪ Actual Performance During 2024/2025; ▪ Risk Management; ▪ Treasury Management and Prudential Indicators (see Appendix 2) 3. The Strategy Agreed for 2024/2025 3.1. At the time of determining the strategy for 2024/2025, economic and interest rate forecasting remained difficult with many external influences weighing on the UK. 3.2. Public Works Loans Board (PWLB) rates and gilt yields were expected to remain volatile as markets reacted to emerging economic data, with the overall long-term trend being for them to decrease slightly during 2024/2025. 158
Page 159
3.3. The differential between investment earnings and debt costs was expected to remain high throughout 2024/2025. This “cost of carrying” would have to be considered if borrowing was taken before our cash flow required funds as returns on deposits were expected to remain lower than the rate paid on borrowing. 3.4. The borrowing strategy adopted was to monitor interest rates, undertake planned borrowing at the best time, while investigating opportunities where possible to improve the management of our existing loan portfolio. 3.5. The main consideration when investing surplus funds was to be the security of the transaction. Liquidity would then be considered and investments would only be made for prudent time periods. Only after considering security and liquidity would the yield to be gained from the investment be considered. 3.6. The Executive Director of Finance and Corporate Resources would apply appropriate restrictions to the Council’s counterparty list to ensure the security of deposits. 4. Treasury Position at 31 March 2025 4.1. The Council began the year with debt of £1,034.532m of which 97.25% was fixed rate loans from the PWLB. By 31 March 2025, debt had decreased to £1,030.762m with fixed rate loans from the Public Works Loans Board (PWLB) making up 94.32% of the debt. 4.2. Table 1 below shows the movement in borrowing to 31 March 2025. Table 1 – Movement in Borrowing from 1 April 2024 to 31 March 2025. Balance as at 01/04/2024 £m New Borrowing £m Debt Maturing £m Debt Repaid £m Balance as at 31/03/2025 £m Increase/ Decrease in Borrowing £m Short Term Borrowing 53.770 145.000 (148.770) 0.00 50.000 (3.770) Long Term Borrowing 980.762 0.000 0.00 0.00 980.762 0.000 TOTAL BORROWING 1,034.532 145.000 (148.770) 0.00 1,030.762 (3.770) 4.3. The Treasury Position at the 31 March 2025 compared with the previous year is shown in Table 2 overleaf: 159
Page 160
Table 2 – Treasury Position as at 31 March 2025 31 March 2025 31 March 2024 Principal Average Rate Principal Average Rate Fixed PWLB £972.262m 3.78% £1,006.032m 3.80% Total Fixed Rate Debt £972.262m 3.78% £1,006.032m 3.80% Market £8.500m 5.46% £8.500m 5.46% Temporary Borrowing £50.000m 5.38% £20.000m 7.20% Total Variable Rate Debt £58.500m 5.39% £28.500m 6.68% Total Debt £1,030.762m 3.87% £1,034.532m 3.88% Total Deposits £23.582m 5.38% £13.475m 5.19% 4.4. The gross debt position decreased by £3.770m from 31 March 2024, accounted for by repayments of PWLB (£33.770m) offset by a net increase in temporary borrowing (£30.000m) temporary borrowing taken for cashflow purposes. 4.5. The Council’s pooled cost of borrowing is measured on an equated debt basis which takes account of how the Council’s capital expenditure was funded throughout the year. The pooled interest cost together with the expenses rate for 2023/2024 and the previous two years is shown in Table 3 below: Table 3 – Pooled Cost of Borrowing Year Loans Fund Pooled Rate Loans Fund Expenses Rate 2024/25 4.22% 0.06% 2023/24 4.12% 0.07% 2022/23 3.59% 0.07% 5. Economic Background for 2024/2025 5.1. The base rate began the year at 5.25%, and following a series of decreases by the Bank of England ended the year at 4.50%. 5.2. Gilt yields and PWLB rates were volatile throughout 2024/2025. The average PWLB rates at the start of 2024/2025 was 5.11%. This increased to a peak of 5.96% in October 2023 before falling back to 5.72% by the 31 March 2025. 5.3. Details of significant interest rates during 2024/2025 are shown in Table 4 below. Table 4 – Significant Interest Rates Borrowing Rates Bank Base Rate 1 Year PWLB 5 Year PWLB 10 Year PWLB 20 Year PWLB 30 Year PWLB 40 Year PWLB 50 Year PWLB High 5.25% 5.61% 5.34% 5.71% 6.14% 6.19% 6.10% 5.88% Average 4.95% 5.14% 4.86% 5.07% 5.50% 5.56% 5.48% 5.32% Low 4.50% 4.77% 4.31% 4.52% 5.01% 5.09% 5.04% 4.88% 160
Page 161
6. Actual Performance during 2024/2025 6.1. Capital expenditure for the year was £113.472m. During 2024/2025 no long-term borrowing was taken. 6.2. The Council had a borrowing requirement of £382.667m for 2024/2025, including £202.676m carried over from previous years. 6.3. The report to South Lanarkshire Council on Service Concessions in January 2023 introduced a strategy that recognised the level of reserves and cash balances held by the council to reduce the need to borrow for this funding requirement. After taking these into account, the council had an expected borrowing requirement of £226.756m for 2024/25. 6.4. During 2024/2025, the Council placed £1,790.422m of deposits on a cumulative basis. All deposits made by the Council were in line with approved lending limits and credit rating criteria. The level of investment return was £3.657m. Further details on deposits are included in the annual investment report within this Committee paper. 7. Risk Management 7.1. The Council has complied with all of the relevant statutory and regulatory requirements which limit the levels of risk associated with its treasury management activities. In particular its adoption and implementation of both the Prudential Code and the CIPFA Treasury Management Code of Practice means both that its capital expenditure is prudent, affordable and sustainable, and its treasury practices demonstrate a low risk approach. 7.2. Investment Risk The main consideration when investing surplus funds is the security of the transaction. Through adoption on the CIPFA Code of Practice and through the Councils Annual Investment Strategy the Council mitigates risks associated with all our permitted investments. 7.3. Interest Rate Risk The Council’s capital programme is funded in part by borrowing. Consideration has always been given to the optimum time to borrow funds to ensure cash flow is maintained, that any risks of increasing borrowing interest rates are minimised and that takes into account the level of cash balances available to the Council. 8. Treasury Management and Prudential Indicators 8.1. The Treasury Management and Prudential Indicators are detailed in Appendix 2 to this report. 161
Page 162
Appendix 2 Treasury Management and Prudential Indicators 2024/2025 1. Treasury Management Indicators 2024/2025 1.1. The Treasury Management Code includes Treasury Management Indicators which are to be reported alongside the Treasury Strategy. 1.2. The purpose of these is to contain the activity of the treasury function within certain limits, thereby managing risk and reducing the impact of an adverse movement in interest rates. The indicators are detailed below. 2. Maturity Structure of Borrowing 2.1. By setting limits on the maturity structure of borrowing, the exposure to large concentrations of fixed rate debt needing to be replaced at the same time in the future at currently unknown rates can be limited. This effectively places a limit on exposure to longer term interest rate movement. Maturity Structure of Borrowing Upper Limit Lower Limit Maximum for period to 31/03/25 Actuals as at 31/03/25 Under 12 months 30% 0% 6.93% 4.85% 12 months and 24 months 40% 0% 12.11% 11.61% 24 months and 5 years 50% 0% 3.92% 3.76% 5 years and 10 years 60% 0% 21.41% 20.52% 10 years and 20 years 60% 0% 19.13% 18.34% 20 years and 30 years 70% 0% 15.36% 14.72% 30 years and 40 years 80% 0% 27.33% 26.20% 40 years and 50 years 90% 0% 0.00% 0.00% 50 years and above 90% 0% 0.00% 0.00% 3. Total Principal Sums Invested for Greater Than 364 days 3.1. The investment regulations introduced by the Scottish Government allowed the Council to invest for periods in excess of 364 days. The Treasury Management Code requires local authorities to set an upper limit for each forward financial year period for investments longer than 364 days. The purpose is to contain the exposure to the possibility of loss that might arise as a result of having to seek early repayment of principal sums invested. 3.2. South Lanarkshire Council set a limit restricting investments for periods in excess of 364 days to no more than £10m and for no more than 5 years. 3.3. No investment was made during 2024/2025 for a period in excess of 364 days. 4. Statutory Repayment of Loans Fund Advances 4.1. The Scottish Government introduced The Local Authority (Capital Financing and Accounting) Scotland Regulations 2016 with effect from 1 April 2016. These regulations require the statutory loans fund to be administered in accordance with the 2016 Regulations, proper accounting practice and prudent financial management. 162
Page 163
4.2. The Council’s capital programmes are partly funded by planned borrowing which is advanced from the Council’s Loans Fund. Repayment of these advances is made each year and forms part of the Council’s revenue expenditure. Borrowing to fund the capital programmes therefore creates a liability to repay those advances from future years’ budgets. The Council is required to report on the commitment to repay loans fund advances. 4.3. The General Fund had an opening balance of £859.048m advances from the Loans Fund. During 2024/2025 new advances of £9.482m were made to part fund the Capital Programme, while repayments of £3.730m were made from the Council’s revenue expenditure. This left a closing balance of £864.800m to be repaid over the next 50 years. 4.4. The HRA had an opening balance of £307.204m advances from the Loans Fund. During 2024/2025 new advances of £16.467m were made to part fund the HRA Capital Programme, while repayments of £0.005m were made from the HRA. This left a closing balance of £323.666m to be repaid over the next 40 years. 4.5. The tables below show the repayment profile of the outstanding loans fund advances for both General Fund and HRA as at 31 March 2025. The tables do not include any planned borrowing that may be taken in future years to fund the ongoing capital programmes. General Fund Opening Balance New Advances Repayments Closing Balance 2024/25 859.048 9.482 -3.730 864.800 2025/26 864.800 0.000 -7.292 857.508 2026/27 – 2029/30 857.508 0.000 -29.538 827.970 2030/31 – 2034/35 827.970 0.000 -40.224 787.746 2035/36 – 2039/40 787.746 0.000 -83.366 704.380 2040/41 – 2044/45 704.380 0.000 -106.399 597.981 2045/46 – 2049/50 597.981 0.000 -135.795 462.186 2050/51 – 2054/55 462.186 0.000 -170.938 291.248 2055/56 – 2059/60 291.248 0.000 -168.128 123.120 2060/61 – 2064/65 123.120 0.000 -90.279 32.841 2065/66 – 2069/70 32.841 0.000 -24.742 8.099 2070/71 – 2074/75 8.099 0.000 -8.099 0.000 Housing Revenue Account Opening Balance New Advances Repayments Closing Balance 2024/25 307.204 16.467 -0.005 323.666 2025/26 323.666 0 -4.405 319.261 2026/27 – 2029/30 319.261 0 -40.517 278.744 2030/31 – 2034/35 278.744 0 -52.660 226.084 2035/36 – 2039/40 226.084 0 -47.194 178.890 2040/41 – 2044/45 178.890 0 -44.386 134.504 2045/46 – 2049/50 134.504 0 -49.537 84.967 2050/51 – 2054/55 84.967 0 -40.417 44.550 2055/56 – 2059/60 44.550 0 -30.129 14.421 2060/61 – 2064/65 14.421 0 -14.421 0.000 163
Page 164
4.6. The Council’s strategy for managing debt includes the early repayment of some loans within the Loans Fund. These repayments result in reduced principal and interest payments in future years and are necessary to keep loan charges affordable. 5. Prudential Code Indicators 2024/2025 5.1. The Prudential Code enables Councils to take responsibility for deciding an affordable level of borrowing to fund capital expenditure. This moves away from the previous regime through which central government gave Councils consent to borrow defined amounts for capital expenditure. 5.2. To meet the objectives of the Code, the Council is required to report a number of indicators, use those to demonstrate the affordability and sustainability of our capital plans and to show that good treasury management practice is adhered to. 6. Capital Expenditure and Borrowing Requirement indicators 6.1. Capital Expenditure 6.1.1 This indicator shows the capital expenditure for 2024/2025. The 2024/2025 estimate is also shown. Actual £ m Estimate £ m Variance £ m General Fund Capital Expenditure 41.928 69.832 -27.904 Funded by: Borrowing 9.482 17.560 -8.078 Capital receipts and grants 31.156 51.353 -20.197 Revenue contributions 1.290 0.919 0.371 Total Funding 41.927 69.832 -27.904 HRA Capital Expenditure 71.544 72.106 -0.562 Funded by: Borrowing 16.467 18.221 -1.754 Capital receipts and grants 21.571 20.379 1.192 Revenue contributions 33.506 33.506 0.000 Total Funding 71.544 72.106 -0.562 6.1.2. The General Fund Capital Expenditure for 2024/2025 was £41.928m which is £27.904m less than estimated in the Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy report presented to South Lanarkshire Council in February 2025. The details of this have been reported to the Executive Committee over recent months, with a final position being reported on 25 June 2025. 6.1.3. The Housing Revenue Account Capital Expenditure in 2024/2025 was £71.544m which is £1.754m less than the estimate reported to South Lanarkshire Council in February 2025. The details of this have been reported to the Executive Committee over recent months, with a final position being reported on 25 June 2025. 164
Page 165
6.2. Councils Borrowing Requirement (the Capital Financing Requirement) 6.2.1. The Council’s Capital Financing Requirement (CFR) is the total outstanding capital expenditure which has not yet been paid for from either revenue or capital resources. It is essentially a measure of the Council’s requirement to borrow for past and present capital expenditure and is comparable to the actual borrowing taken and finance lease liability. 6.2.2. The Council is required to pay off an element of the accumulated balance of borrowing every year through a charge to the revenue account. 6.2.3. Over the medium-term borrowing should only be for a capital purpose. Gross borrowing should not, except in the short term, exceed the CFR for 2024/2025 plus any additional capital financing requirement over 2025/2026 and the following two financial years. The table below demonstrates that the Council has complied with this requirement 6.2.4. The Capital Financing Requirement for the General Fund is £154.954m higher than forecast and for HRA is £1.855m lower than forecast. For the General Fund this is due to the introduction of a new accounting standard (IFRS16) which changes how the Council accounts for leases. This resulted in a remeasurement of lease liabilities. This was unable to be quantified at the time the estimates were calculated 31 March 2025 Actual £ m 31 March 2025 Estimate £ m Variance General Fund Capital Financing Requirement 1,268.007 1,113.053 154.954 HRA Capital Financing Requirement 323.678 325.533 -1.855 Total Capital Financing Requirement 1,591.685 1,438.586 153.099 Treasury Position as at 31 March 2025 Borrowing 1,030.762 1,122.450 -91.688 PPP Finance Lease Liability 323.255 164.646 158.609 Gross Debt 1,354.017 1,287.096 66.921 6.2.5. The Council’s gross borrowing position for 2024/2025 was £1,354.017. This consists of external borrowing of £1,030.762m and the PPP Finance Lease Liability of £323.255m. Gross borrowing is less than the capital financing requirement of £1,591.685m due to the fact that no long-term borrowing was taken during 2024/2025. 6.2.6. The most significant increase in the Capital Financing Requirement has been the remeasurement of the PPP/Finance Liability due to the introduction of a new accounting standard (IFRS16) which changes how the Council accounts for leases. This resulted in a remeasurement of lease liabilities. This was unable to be quantified at the time the estimates were calculated. 6.2.7. This is purely an accounting treatment, has no impact on the General Fund balance and does not require the Council to take any additional borrowing. 165
Page 166
6.2.8. The Council used the significant cash balances it had available in lieu of the remainder of its borrowing requirement. Borrowing before cash was required would incur a cost of carry as the interest rates achievable on deposits continue to be less than the interest rates on borrowing. 6.2.9. By not taking any long term borrowing during 2024/2025, interest costs for 2024/2025 were reduced and savings from this used to support the Revenue Budget Strategy going forward. 6.3. Limits to Borrowing Activity 6.3.1. The Operational Boundary for external debt is based on the expected maximum external debt that could be faced in the course of the year. It is set to accommodate the borrowing requirements and also includes sufficient scope to allow for changes to the capital programme throughout the year. This limit may be breached during the year, and this will be reported in the Prudential report presented to Committee after year end. 6.3.2. The Authorised Limit for External Debt represents a limit beyond which external debt is prohibited. It represents the level of external debt which could be afforded in the very short-term, but is not sustainable in the longer term without consideration to revenue budgets. This limit would not be breached without the Finance and Corporate Resources Committee being advised. 2024/2025 £ m Operational Limit for External Debt 1,460.000 Authorised Limit for External Debt 1,480.000 Maximum Borrowing Position During the Period 1,053.762 Operational Limit for Other Liabilities (PPP/Finance Lease) 180.000 Authorised Limit for Other Liabilities (PPP/Finance Lease) 180.000 Maximum PPP/Finance Lease Liability 323.255 6.3.3. The table demonstrates that during 2024/2025 the Council maintained its borrowing within the Authorised Limits and Operational Boundaries for External Debt. 6.3.4. As mentioned in 6.2.6. a new accounting standard introduced in 2024/2025 (IFRS16) changed how the council accounted for leases. This included the remeasurement of existing lease liabilities and the recognition of additional leases. This was unable to be quantified at the time the estimates were calculated. Had it been able to quantify the increase the limits for other liabilities would have been increased to reflect this. 166
Page 167
7. Affordability Indicators 7.1. Ratio of Financing Costs to Net Revenue Stream 7.1.1. This indicator focuses on the extent to which the Council’s net revenue budget is used for servicing debt. This is shown for both General Fund and HRA. 2024/25 Actual £ m 2024/25 Estimate £ m General Fund Ratio of Financing Costs to Net Revenue Stream (expressed as %) 4.81% 3.91% HRA General Fund Ratio of Financing Costs to Net Revenue Stream (expressed as %) 9.33% 8.58% 7.1.2. For the General Fund, the ratio is higher than forecast. This is due to costs previously classified as operating costs now being classified as financing costs under IFRS16. 7.1.3. For the HRA, the ratio is also lower than forecast due to actual borrowing costs being higher than forecast and a slight decrease in income. 167
Page 168
Appendix 3 Annual Investment Report 1. Permitted Investments 1.1. During 2024/2025 South Lanarkshire Council only used the following permitted investments ▪ Deposits with the Debt Management Account Deposit Facility ▪ Deposits with UK Local Authorities ▪ Deposits with Banks and Building Societies 1.2. Deposits made in the period 1 April 2024 to 31 March 2025 totalled £1,790.422m. This is broken down per sector and institution in the table below. 86.26% of these deposits were made in the UK Government through the Debt Management Account Deposit Facility (DMADF). Counterparty Deposit Totals (£m) % of Total Deposits Average Interest Rate Deposits in UK Government Debt Management Account Deposit Facility 1,544.475 86.26% 4.88% Total Deposits in UK Government 1,544,475 86.26% 4.88% Deposits in UK Local Authorities 157.400 8.79% 5.08% Deposits in UK Banks and Building Societies Bank of Scotland 88.547 4.95% 4.86% Total Deposits in UK Banks 88.547 4.95% 4.86% Total Deposits 01/04/2024 to 31/03/2025 1,790.422 100.00% 4.99% 1.3. The average interest rates achieved from the deposits are shown in the table above. Interest rates achievable for deposits have been falling since the Bank of England began a series of interest rate cuts 1.4. Actual deposits as at 31 March 2025 totalled £23.582m. 2. Risk Management 2.1. The following minimum thresholds were set in the strategy for all deposits with banks and building societies, including Certificate of Deposits. Rating Agency Long Term Rating Maximum Deposit Fitch A- £20m Moody’s A3 £20m Standard and Poors A- £20m 168
Page 169
2.2. Prior to depositing funds with any bank or building society, checks are made with the Council’s treasury adviser, MUFG, that the institution is considered safe and that any deposit conforms to their recommended time duration as determined by their Rating Methodology. This methodology uses credit ratings, rating watches and outlooks and credit default swap (CDS) prices to establish a suggested time duration for deposits. 2.3. The tables below show a breakdown of deposits with details of the credit ratings of banks and building societies used from 1 April 2024 to 31 March 2025. Deposits with the DMADF are with the UK Government and so have a very high credit rating. Deposits with local authorities are considered to be of very high credit quality despite most local authorities not having formal credit ratings. Fitch Ratings Long Term Rating Short Term Rating Deposits Totals Percentage of Total Deposits Deposits with DMO/UK Government (AA-) 1,544.475m 86.26% Deposits with Local Authorities 157.400m 8.79% AA- F1 38.379m 2.15% A+ F1 50.168m 2.80% Total 1,790.422m 100.00% Moody’s Ratings Long Term Rating Short Term Rating Deposits Totals Percentage of Total Deposits Deposits with DMO / UK Government (Aa3) 1,544.475m 86.26% Deposits with Local Authorities 157.400m 8.79% A1 P-1 88.547m 4.95% Total 1,790.422m 100.00% Standard and Poor’s Ratings Long Term Rating Short Term Rating Deposits Totals Percentage of Total Deposits Deposits with DMO / UK Government (AA) 1,544.475m 86.26% Deposits with Local Authorities 157.400m 8.79% A+ A-1 88.547m 4.95% Total 1,790.422m 100.00% 2.4. The tables show that 95.05% of deposits were made with counterparties of very high credit quality (UK Government - DMADF and other local authorities). All deposits made by the Council were in line with approved lending limits and credit rating criteria. 2.5. In order to manage liquidity risk the Council held an average of £7.837m in bank accounts with instant access. 2.6. No deposits were placed for periods in excess of 364 days. 3. Borrowing in Advance 3.1. No borrowing in advance was taken during 2024/2025. 169
Page 170
Appendix 4 Investment Treasury Risks Mitigating Controls Limits Deposits with the Debt Management Account Deposit Facility This is a deposit with the UK Government and so credit risk is very low. Liquidity risk has to be considered as deposits can only be broken with the agreement of the counterparty and penalties may apply. There is no market risk as the principal sum invested is not affected by market prices. There are no mitigating controls required. There is no maximum monetary limit. A maximum term of deposit of six months as set by the Debt Management Office. Deposits with UK Local Authorities and other bodies defined as local authorities in the Local Government Scotland Act 2003 (And Equivalent English Act) These are considered to be quasi UK Government investment and as such credit risk is very low. Liquidity risk has to be considered as deposits can only be broken with the agreement of the counterparty and penalties may apply. There is no market risk as the principal sum invested is not affected by market prices. There are no mitigating controls required. The maximum deposit with any local authority will be £20m for deposits less than one year. Deposits in excess of one year will be subject to a maximum term of deposit of three years and be limited to £10m. 170
Page 171
Investment Treasury Risks Mitigating Controls Limits Deposits with Banks and Building Societies These tend to be low risk but credit risk will be higher than deposits placed with the DMO or UK local authorities. Liquidity risk has to be considered as deposits can only be broken with the agreement of the counterparty and penalties may apply. There is no market risk as the principal sum invested is not affected by market prices. The counterparty selection criteria restricts lending only to high quality counterparties, measured initially by credit ratings from Fitch, Moody’s and Standard and Poors. Additional indicators of creditworthiness will also be considered prior to placing any deposits. Liquidity risk can be controlled by the use of instant access call accounts. The maximum deposit with any bank or building society will be £20m. A maximum term of deposit of 364 days. Certificates of Deposit with Banks and Building Societies These are short to medium term dated marketable securities issued by financial institutions. These tend to be low risk investments but credit risk will be higher than deposits placed with the DMO or UK local authorities. Liquidity risk is lower than placing a deposit with a Bank or Building Society as these can be sold on the market. There is a risk of capital loss arising from selling ahead of maturity. The counterparty selection criteria restricts lending only to high quality counterparties, measured initially by credit ratings from Fitch, Moody’s and Standard and Poor’s. Additional indicators of creditworthiness will also be considered prior to using this type of instrument. Market risk would be mitigated by holding the instrument to maturity. The maximum investment with any bank or building society will be £20m. A maximum period of investment of 364 days. 171
Page 172
Investment Treasury Risks Mitigating Controls Limits UK Government Gilts and Treasury Bills These are marketable securities issued by the UK Government and as such credit risk is very low. Liquidity risk is very low as there is a huge market for Gilts and Treasury Bills There is a risk of capital loss arising from selling ahead of maturity. There are no mitigating controls required for credit risk as the investment is with the UK Government. Market risk would be mitigated by holding the instrument to maturity. There is no maximum limit to investments in UK Gilts or Treasury Bills for maturities less than one year and a limit of £10m for maturities greater than one year. The maximum period of investment will be five years. AAA Rated Bonds Issued by Multilateral Development Banks These are bonds issued by supranational bodies such as the European Investment Bank or World Bank and as a result are backed by several sovereign states and as such credit risk is very low. Liquidity risk is very low as there is a large market for Supranational Bonds. There is a risk of capital loss arising from selling ahead of maturity. As the investment is effectively spread across a number of sovereign states, the Council will mitigate the credit risk of holding such bonds by considering the sovereign rating of the underlying sovereign states and only holding bonds that have a AAA rating. Market risk would be mitigated by holding the instrument to maturity. The maximum amount that will be invested in AAA Rated Bonds issued by Multilateral Development Banks is £10m. The maximum period of investment will be five years. AAA Rated Money Market Funds Money market funds are pooled funds that invest in short-term money market instruments and other debt instruments. The underlying investments are diversified and Credit risk, liquidity risk and market risk are all very low. Investments in these MMFs are highly liquid (same day liquidity). Money Market Funds will only be used where they have obtained a AAA rating from the credit rating agencies. In addition to the credit rating, Money Market Funds will also be assessed for suitability on fund size, the strength of the custodian and the stability of invested capital. Investments in Money Market Funds will be limited to 0.5% of the Money Market Fund Balance and to no more than £10m in any one Fund. Investments in Sterling Government Money Market Funds which only invest in Sterling denominated short term debt securities issued by the UK Government will be restricted to 2% of the Money Market Fund size and to no more than £10m in any individual Money Market Fund. 172
Page 173
Investment Treasury Risks Mitigating Controls Limits Loans to Third Parties These are service investments which may exhibit credit risk and are likely to be highly illiquid. Any new types of loans to third parties should be approved by Members through the appropriate Committee with full consideration of the service rationale behind the loan and the likelihood of partial or full default and the impact that this will have on service budgets. 173
Page 174
174
Page 175
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Revenue Collection and Approval for Write Offs 1. Purpose of Report 1.1. The purpose of the report is to:- advise the Committee of Revenue Collection performance for financial year 2025/2026 to 31 July 2025 advise the Committee of the position regarding the Non-Domestic Rates Incentivisation Scheme (NDRIS) for financial year 2025/2026 seek approval for write offs 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- (1) that performance in the collection of revenue be noted; (2) that the current position in respect of NDRIS be noted; and (3) that write offs for the following be approved:- Council Tax £1,753,617.19 Non-Domestic Rates £582,799.00 BID Levy £1,583.87 Sundry Debt £1,606,030.01 Housing Rent and associated charges £402,104.09 3. Background 3.1. Responsibility for the collection of Council Tax, Non-Domestic Rates (NDR) and Sundry Debt is the responsibility of Finance and Corporate Resources. This report and the attached appendix provide information on collection performance and proposals for write off. 4. Current Collection Performance 4.1. The first table in Appendix 1 presents the collection performance for Council Tax, NDR and Sundry Debts for financial year 2025/2026. 4.2. The annual Council Tax collection target for 2025/2026 has been set at 95.6%. Council Tax collection is currently 41.70%, ahead of target by 0.01% and ahead of comparable performance in 2024/2025 by 0.01%. 4.3. A Non-Domestic Rates (NDR) collection target of 97.6% has been set for 2025/2026. NDR collection is currently 35.8%, ahead of target by 0.1% and ahead of comparable performance in 2024/2025 by 0.1%. 13 175
Page 176
4.4. The 2025/2026 annual target for Sundry Debt collection has been set at 97.5%. Sundry Debt collection to 31 July 2025 was 97.3%, behind target by 0.2% and behind comparable performance in 2024/2025 by 0.6%. 5. Arrears Collection Performance 5.1. Arrears collection performance for Council Tax, NDR and Sundry Debt is presented in the second table of Appendix 1. 5.2. The 2025/2026 arrears annual target for Council Tax has been set at £3.000 million, with collection to 31 July 2025 of £1.465 million, ahead of target by £0.007 million (0.2%) and behind comparable performance in 2024/2025 by £0.179 million. 5.3. The 2025/2026 arrears target for NDR has been set at £2.000 million, with collection to 31 July 2025 of £1.240 million, ahead of target by £0.045 million (2.2%) and ahead of comparable performance in 2024/2025 by £0.141 million. 5.4. The 2025/2026 arrears target for Sundry Debt was set at £14.076 million, with collection to 31 July 2025 of £10.608 million, equal to target and ahead of comparable performance in 2024/2025 by £4.938 million. 6. Non-Domestic Rates Incentivisation Scheme 6.1. The Non-Domestic Rates Incentivisation Scheme (NDRIS), formally known as the Business Rates Incentivisation Scheme is a Scottish Government initiative to incentivise growth of the local business tax base, with a view to increasing NDR income yields. 6.2. The Scottish Government sets annual targets for growth (buoyancy) and councils who achieve their target retain 50% of the additional income generated above the target. The buoyancy target is a measure of the increase in the total rateable value of the non-domestic properties on the Valuation Roll (including certain categories of public undertakings). 6.3. The provisional buoyancy target for South Lanarkshire Council in 2025/2026 has been set by the Scottish Government at 0.9%. This is a measure of the increase in the total rateable value of the non-domestic properties on the Valuation Roll (including certain categories of public undertakings). 6.4. Performance against the NDRIS target will be reported to Committee on a quarterly basis. Buoyancy to the end of June 2025, was 0.04%. 6.5. The tax base must achieve growth of more than 0.86% during the remaining three quarters of the financial year to secure additional income under the scheme. 7. Proposals for Write Off 7.1. Approval for write off of the following irrecoverable debts is requested from the Committee. The Council has the power to write off accounts where the debtor is deceased, sequestrated, in liquidation or the debt is prescribed or where the debt is deemed uneconomical to pursue. 176
Page 177
7.2. The proposed write off of Council Tax accounts dating from 1993/1994 to 2025/2026 totals £1,753,617.19 relating mainly to prescribed debt, sequestrations and estates of the deceased. This includes the bulk write off of prescribed debt for financial year 2002/2003. 7.3. The value of accounts currently marked for write off in the Non-Domestic Rates system from rating years 2023/2024 to 2025/2026 totals £582,799.00. These debts are deemed to be irrecoverable because the debtor is in liquidation, has ceased trading or has been sequestrated. 7.4. Approval is sought for the write off of Business Improvement District (BID) Levies totalling £1,583.87, administered by the Council on behalf of the Hamilton, Carluke and Lanark BID companies. There is no financial impact on the Council for these write offs. 7.5. Following consultation and agreement with Resources, the proposed write off of Sundry Debt totals £1,606,030.01. Appendix 2 provides a breakdown of the proposed write-off over categories. 7.6. Approval is sought for the write off of former tenant rent arrears of £385,884.19 (including bulk write offs for financial year 2025/2026 Q1 for temporary accommodation) and Housing Benefit Overpayments of £16,219.90. 7.7. A full list of all debts proposed for write off is held by the Executive Director (Finance and Corporate Resources). 8. Employee Implications 8.1. None. 9. Financial Implications 9.1. Provision has been made for the financial impact of all write offs. 10. Climate Change, Sustainability and Environmental Implications 10.1. There are no direct climate change, sustainability and natural environment implications arising from this report. 11. Other Implications 11.1. The main risk associated with the Council’s revenue collection is a failure to monitor collection rates and take effective corrective action where required, resulting in a significant reduction in collection performance and Council funding. The risk is managed through monthly performance reporting and review of performance at monthly Senior Management Meetings. 11.2. There are no implications for sustainability in terms of the information contained in this report. 12. Integrated Impact Assessment and Consultation Requirements 12.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 12.2. There is also no requirement to undertake any consultation in terms of the information contained in the report. 177
Page 178
Jackie Taylor Executive Director (Finance and Corporate Resources) 20 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective, efficient and transparent Ambitious, self-aware and improving Previous References Finance and Corporate Resources Committee – 11 June 2025 List of Background Papers System Reports from Council Tax, Non-Domestic Rates, Sundry Debt and Academy Housing Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Craig Fergusson, Head of Finance (Transactions) Ext: 4951 (Tel: 01698 454951) E-mail: craig.fergusson@southlanarkshire.gov.uk 178
Page 179
Appendix 1 SOUTH LANARKSHIRE COUNCIL REVENUES COLLECTION FOR PERIOD ENDING 31 JULY 2025 Annual Budget Cash Target Actual Variance % Variance Budget to 31/07/25 to 31/07/25 to 31/07/25 to Notes £000's £000's £000's £000's annual budget FINANCIAL YEAR 2025/2026 Council Tax 168,253 73,373 73,391 18 over 0.01% Non-Domestic Rates 393,427 143,907 144,217 310 over 0.1% Sundry Debt 130,185 130,185 129,886 (299) under -0.2% ARREARS Council Tax 3,000 1,458 1,465 7 over 0.2% Non-Domestic Rates 2,000 1,195 1,240 45 over 2.2% Sundry Debt 14,076 10,613 10,608 (5) under 0.0% 179
Page 180
Appendix 2 BREAKDOWN OF PROPOSED SUNDRY DEBT WRITE-OFF Resource Service No. of Accounts Value (£) Housing & Technical Housing Support Services / H&T General / Estates (Commercial Rent) 59 24,601.34 Rechargeable Repairs / Capital Repairs 464 163,697.28 Community and Enterprise / Education Care of Gardens / Regeneration / Education General 4 2,359.98 Finance & Corporate Housing Benefit Overpayments / F&C General 7 1,415,371.41 Total 534 1,606,030.01 180
Page 181
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Short Term Lets Licence Fees for New Application Types 1. Purpose of Report 1.1. The purpose of the report is to:- request approval for a fee structure in respect of new Short Term Lets application types 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- (1) that the fees for new Short Term Lets application types, as detailed in paragraph 4.2 of this report, be approved. 3. Background 3.1. On 2 November 2022, the Executive Committee approved the Council’s Short Term Lets Policy, in implementation of the Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022 which introduced the Short Term Lets licensing regime. There are approximately 195 licensed short term lets within the South Lanarkshire area. 3.2. On 29 August 2024, the Civic Government (Scotland) Act 1982 (Licensing of Short- term Lets) Amendment Order 2024 (‘the 2024 Order’) was enacted to include the following licence application types in the Short Term Lets licensing regime, along with other minor technical changes:- Provisional Short Term Let Licence Confirmation of Provisional Short Term Let Licence Transfer of Short Term Let Licence. 3.3. On 24 June 2025, the Licensing Committee approved minor changes to the Council’s Short Term Lets Policy to include these new application types. The Licensing Committee also approved, in principle, to new fees for these additional application types. 4. Proposals 4.1. As at the date of this report, the Council has received no applications of the types now permitted in terms of the 2024 Order but as noted above, it was appropriate to update the Policy to include provision for those now, pending the scheduled three yearly review of the policy which will commence shortly. 14 181
Page 182
4.2. A fee structure has been proposed, approved in principle by the Licensing Committee, as follows in respect of these new application types:- Provisional Short Term Let Licence £200 Confirmation of Provisional Short Term Let Licence Full fee minus £200 already paid for the Provisional Short Term Let Licence Transfer of Short Term Let Licence £150 4.3. The proposed fees reflect fees charged by the Council in respect of similar application types within the Licensing (Scotland) Act 2005 and other licensing fees within South Lanarkshire. Going forward, these fees would be reviewed as part of the annual review of fees and charges that takes place at the time of the Council’s annual budget setting. 4.4. The Executive Committee will receive a report later in 2025 with any further changes proposed to the Policy following the 3 yearly review. A public consultation on the existing Policy, and any proposed changes, will be carried out as part of this review. 5. Employee Implications 5.1. There are no employee implications arising from this report. 6. Financial Implications 6.1. There are no financial implications arising directly from this report. New application fees are proposed for the 3 application types now permitted under the Short Term Lets regime. However, it is not currently expected that this will generate much additional fee income for the Council, with the Council having not received any such applications to date. 7. Climate Change, Sustainability and Environmental Implications 7.1. There are no climate change, sustainability and environmental implications arising directly from this report. 8. Other Implications 8.1. There are no other implications in terms of risk arising directly from this report. 9. Integrated Impact Assessment and Consultation Requirements 9.1. There is no requirement to carry out an impact assessment in terms of the proposals contained within this report, given they are of a minor technical nature reflecting legislative changes to the Short Term Lets framework. Subject to any changes proposed to the Policy as part of the 3 yearly review, this will be re-assessed at that time. 9.2. There was no requirement to undertake a consultation in terms of the content of this report. Jackie Taylor Executive Director (Finance and Corporate Resources) 4 August 2025 182
Page 183
Link(s) to Council Values/Priorities/Outcomes Focused on people and their needs Previous References Executive Committee of 2 November 2022 Licensing Committee of 24 June 2025 List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact: - Margaret Mary Wilson, Legal Services Manager Ext 4501 (Tel : 01698 454501) E-mail margaretmary.wilson@southlanarkshire.gov.uk 183
Page 184
184
Page 185
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Reserves Strategy 1. Purpose of Report 1.1. The purpose of the report is to:- provide information on the Council’s Reserves Strategy, including their position as at the end of 2024/2025, and information on their planned use across the coming years 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- (1) that the detail on the Reserves and their balance at the end of 2024/2025 (section 4), be noted; (2) that the Strategy proposed for each Reserve (section 5), be noted; and (3) that the planned use of Reserves across the coming years (section 6, Appendix 1), be noted. 3. Background 3.1. A Reserves Strategy was presented to the Finance and Corporate Resources Committee on 30 October 2024. This detailed the Council’s Reserves, their balance at the end of 2023/2024, their purpose, and also a proposed strategy 3.2. A report titled 2026/2027 to 2027/2028 Revenue Budget Strategy was presented to the Executive Committee on 25 June 2025. 3.3. Section 8 of the June 2025 Revenue Budget Strategy report to Executive Committee (link above) noted that an annual review would be undertaken to consider the monies held in the Earmarked/Committed General Fund Reserve, alongside the Council’s Revenue Budget Strategy 3.4. Section 4 details the Council’s Reserves and their balance at the end of 2024/2025. The Council’s Reserves, their purpose, and their link to the Revenue Budget Strategy is provided at section 5. Section 6 outlines the profiled use of Reserves across the coming years. 4. Reserves and their Position at end 2024/2025 4.1. It is the responsibility of the Executive Director (Finance and Corporate Resources) to advise the Council on the level of reserves it should hold and to ensure that there are clear protocols for their establishment and use. 15 185
Page 186
4.2. The Local Authority Accounting Panel (LAAP) provide guidance to the Council’s Section 95 Officer (the Executive Director of Finance and Corporate Resources), on the establishment and maintenance of local authority reserves and balances. The LAAP Bulletin 99 (Local Authority Balances and Reserves) does not prescribe a minimum level of reserves which should be held by a council. It is for the Council to consider an appropriate level of reserves taking cognisance of strategic, operational and financial risks facing the authority at a local level. It does, however, say that Reserves should not be held without a clear purpose. Section 5 of this paper will detail a Strategy for each of the Council’s Reserves. 4.3. The Council has a number of earmarked/specific reserves and one General Fund. This General Fund is split into 2 with an element being earmarked/committed (including that set aside for future budget strategies), and also an unearmarked element. Table 1 shows a summary of the Reserves position at the end of financial year 2024/2025. Table 1 – Reserves Analysis £m £000 Total Usable Reserves 147.568 Less: General Fund (earmarked/committed inc. Budget Strategies) 105.956 Repairs and Renewals 5.122 Insurance Fund 1.812 Capital Funds 11.195 Housing Revenue Account 10.440 Total Earmarked/Committed Usable Reserves 134.525 Uncommitted General Fund 13.043 4.4. Table 1 shows the level of Unearmarked/Uncommitted General Fund at £13.043 million at end financial year 2024/2025 (in line with 2023/2024). These monies are for use in an emergency situation and are a cushion to contribute towards unanticipated pressures that the Council may face in year. The Council holds this to use in the event of unforeseen circumstances and is not available for routine operational activities. 4.5. Of this total Reserves balance, the Earmarked/Committed General Fund totals £105.956 million and this includes £84.324 million identified for use in the Council’s Revenue Budget Strategies. The Council’s Financial Strategy is predicated on the utilisation of Reserves across a number of years, with a view to managing the savings requirement in those years. The Reserves being used have either been:- reserves generated through the implementation of the Service Concession arrangements approved in November 2022 (final year 2025/2026) the underspend generated by the reduced pension contributions during 2024/2025 and 2025/2026 approved in November 2023 (final year of use being 2026/2027) the result of underspends generated from the Loans Fund Review and Service Concessions as approved at Council in February 2025 budget underspends previously earmarked for use in the Budget Strategy, including pay award or budget underspends previously earmarked for Children and Families budget pressures. 186
Page 187
4.6. The other amounts within the overall total estimated Reserves at the end of 2024/2025 relate to specific Reserves such as the Housing Revenue Account, the Insurance Fund and Capital Funds. All other Reserves are held for specific purposes and the total balance of Reserves currently held is considered an appropriate level in relation to the Council’s financial position. 5. Reserves Position Review 5.1. The position on each Reserve is taken in turn along with an update on each. 5.2. General Fund: The Council’s General Fund is split into 2 parts – Unearmarked/Uncommitted and Earmarked/Committed. Each is taken in turn along with the proposed plan to managing each Reserve. 5.3. Uncommitted General Fund: As at 31 March 2025, the Council’s uncommitted General Fund remains at £13.043 million. As noted in section 4.4, these monies are for use in an emergency situation and are a cushion to contribute towards unanticipated pressures that the Council may face in year. The Council holds this to use in the event of unforeseen circumstances and is not available for routine operational activities. Against an expenditure budget of £1,019 million for 2025/2026, this represents a 1.3% reserve. 5.4. It is proposed that rather than suggesting that our Unearmarked/Uncommitted General Fund Reserve should be higher, we continue to adopt the approach suggested by the LAAP Guidance (section 4.2), and that a risk-based approach is applied. This would mean giving consideration to the level of the Unearmarked/Uncommitted General Fund Reserve on an annual basis, reflecting the Council’s planning and budget strategy position. The Council does not rely on Reserves to fund Revenue expenditure without a clear plan. 5.5. Earmarked General Fund: As at 31 March 2025, there are £105.956 million of earmarked general funds. Of this amount, £84.324 million has been earmarked for use in the Council’s medium term Budget Strategy (section 4.5). The remaining £21.632 million is earmarked for specific purposes including Early Learning and Childcare (£2.361 million) and multi-year Investments caried forward (£2.456 million). Other significant balances include multi-year project funding (£2.856 million), Scottish Welfare Fund (£1.153 million), Homelessness (£1.930 million) and Ukraine Resettlement (£1.703 million). The remaining balance of around £9 million relates to a number of other specific smaller projects. Future additions to the Reserve will be based on Resource requests to earmark funds and will be subject to Member approval (either in the Probable Outturn or the year-end report to the Council’s Executive Committee). A review will continue take place annually to consider the monies held in the Earmarked/Committed General Fund Reserve, alongside the Council’s revenue Budget Strategy and assessment of expenditure and funding risk areas. 5.6. Repairs and Renewals Fund: This fund has been established mainly through contributions from the revenue budget. As at 31 March 2025 the balance on this fund is £5.122 million. Contained within the overall heading of Repairs and Renewals is the Winter Maintenance Fund (£0.422 million at March 2025) and the Strategic Waste Fund, a sum of money to assist in managing the impact of uneven cash flows and contract cost increases in relation to the Council’s Waste Collection/Disposal contracts (£2.871 million). These funds have been set aside and earmarked for specific purposes. Any future additions would be based on Resource requests for specific projects and will be subject to Member approval (either in the Probable Outturn or the year-end report to the Council’s Executive Committee). 187
Page 188
5.7. Insurance Fund: Council Resources contribute to the Insurance Fund. The fund meets the cost of premiums, paying uninsured excess settlements. 5.8. As at 31 March 2025, the balance on this fund is £1.812 million. The budget for insurance annually should cover costs each year, however due to the timing of claims and payments, the fund is used to manage the multiyear nature of spend and to carry forward balances. Further budget allocations have been made in future years including in the 2026/2027 to 2027/2028 Budget Strategy. 5.9. Capital Fund: The money held within the Capital Fund may be used to fund expenditure of a capital nature or to repay loan fund principal which allows flexibility in the Revenue Budget. At 31 March 2025, the balance on this fund is £11.195 million. Contained within the overall heading of the capital fund are specific funds including, IT Development Fund (£0.289 million), Central Energy Efficiency Fund (CEEF) (£1.181 million), Education Capital Replacement Fund (£2.035 million) and the Usable Capital Receipts (£7.410 million). The Capital receipts are specifically earmarked to fund the capital programme. The CEEF fund is specifically earmarked for energy efficiency projects within the Capital Programme with projects approved on an annual basis. The Education Capital Replacement Fund is subject to the Devolved School Management arrangement for schools (these monies are specifically set aside by schools for specific spend items, from their devolved budget). Any future additions to the Fund would be based on Resource requests for specific projects and will be subject to Member approval (either in the Probable Outturn or the year-end report to the Council’s Executive Committee). 5.10. Housing Revenue Account Reserve: the balance on this fund as at 31 March 2024 is £10.440 million. These monies are ring fenced for the activities associated with the Council’s Housing stock. 6. Profiled Use of Reserves 6.1. Appendix 1 attached shows the Council’s Reserves at the end of 2024/2025, and a profile of anticipated use across the coming years. The main movements reflect the use of Reserves in the Council’s Revenue Budget Strategy, relating to the use of Reserves established following the implementation of the Service Concession arrangements and from the reduced pension contributions (as part of the Revenue Budget Strategy – Executive Committee, November 2023). 6.2. The table in Appendix 1 shows that all Reserves are committed, except the Unearmarked/Uncommitted General Fund Balance of £13.043 million. 7. Employee Implications 7.1. There are no direct employee implications from this report. 8. Financial Implications 8.1. The financial implications are summarised within the report. 9. Climate Change, Sustainability and Environmental Implications 9.1. There are no implications for climate change, sustainability or the environment in terms of the information contained in this report. 9.2. Climate Change targets will have an impact on the Council’s future financial strategies. This will be included in future Budget Strategy papers as appropriate. 188
Page 189
10. Other Implications 10.1. The review of reserves is a key part of understanding the Council’s level of financial resilience in light of the financial risks and challenges it faces. The financial strategy is the way in which the Council can manage a number of these key risks which directly impact on the money available to deliver Council outcomes. 10.2. We will continue to monitor and report on the reserves as appropriate. 11. Integrated Impact Assessment and Consultation Requirements 11.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 11.2. There is no requirement to undertake any consultation in terms of the information contained in this report. Jackie Taylor Executive Director (Finance and Corporate Resources) 14 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, Effective, Efficient and Transparent Previous References Finance and Corporate Resources Committee, 30 October 2024 Executive Committee, 25 June 2025 List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact: Jackie Taylor, Executive Director, Finance and Corporate Resources Ext: 4637 (Tel: 01698 454637) E-mail : jackie.taylor@southlanarkshire.gov.uk 189
Page 190
Appendix 1 Reserves and Their Estimated Use Across 2025/2026 to 2027/2028+ Balance at end 2024/2025 Estimated Use in 2025/2026 Estimated Transfer to Reserves in 2025/2026 Estimated Balance at end 2025/2026 Estimated Use in 2026/2027 Estimated Balance at end 2026/2027 Estimated Use in 2027/2028 and Beyond £m £m £m £m £m £m £m Earmarked / Committed Usable Reserves General Fund (earmarked/committed inc. Budget Strategies) 105.956 (40.722) 27.208 92.442 (38.026) 54.416 (54.416) Repairs and Renewals 5.122 (2.398) 0.000 2.724 (1.977) 0.747 (0.747) Insurance Fund 1.812 (1.500) 0.000 0.312 (0.312) 0.000 0.000 Capital Funds 11.195 (3.198) 0.000 7.997 (4.917) 3.080 (3.080) Housing Revenue Account 10.440 (4.001) 0.000 6.439 (4.000) 2.439 (2.439) Total Committed Usable Reserves 134.525 (51.819) 27.208 109.914 (49.232) 60.682 (60.682) Unearmarked / Uncommitted General Fund 13.043 0.000 0.000 13.043 0.000 13.043 0.000 Total Reserves 147.568 (51.819) 27.208 122.957 (49.232) 73.725 (60.682) * Estimated use / transfers to reserves for 2025/2026 based on the Period 4 Monitoring reports and estimates for the remainder of the year. 190
Page 191
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Common Good Update Report 1. Purpose of Report 1.1. The purpose of the report is to:- [purpose] advise members of the Common Good Accounts for the year ended 31 March 2025 provide an update on the cyclical spend currently committed against the Common Good Repairs and Maintenance budgets for both Lanark and Hamilton advise members of requests for funding from Lanark Common Good that cannot be met from the Repairs and Maintenance budgets [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- [recs] (1) that the accounts for Common Good for the year ended 31 March 2025 (section 4), be noted; (2) that the cyclical spend committed against the Common Good Repairs and Maintenance budgets for Lanark and Hamilton (sections 5 and 6 respectively), be noted; (3) that previously approved projects that would require funding from Lanark Common Good outwith the Repairs and Maintenance budgets (Section 7), be noted; and (4) that future projects that would require funding from Hamilton Common Good outwith the Repairs and Maintenance budgets (Section 8), be noted. 3. Background 3.1. The Common Good is a fund of money/assets and is administered by a Scottish local authority in respect of each former burgh within the area of the local authority. 3.2. Common Good property is administered separately from other local authority assets for accounting purposes. What the authority can do with the assets is subject to a system of statutory control. This control has the potential to limit the extent to which the authority can dispose of or deal with the asset and on what terms. 3.3. The Common Good funds held within South Lanarkshire Council are Lanark, Biggar, Hamilton and Rutherglen. Accounts are prepared on an annual basis, as part of the Council’s year end process. The position for the year ended 31 March 2025 is detailed in section 4. 16 191
Page 192
3.4. The Common Good Accounts in Lanark and Hamilton hold a number of properties. A proactive approach to maintenance supports the viability of these assets and reduces the risk to greater liability in the future. 3.5. The Finance and Corporate Resources Committee, at its meeting on 2 October 2013, approved an annual cyclical maintenance plan of £15,000 for both Lanark and Hamilton Common Good properties. The Executive Director (Finance and Corporate Resources) has delegated authority to approve maintenance work up to the value of £15,000 per annum for each fund. If inspections highlight requirements to undertake investment which would be beyond routine maintenance, this will be considered separately for approval and will be the subject of a report to this Committee. 3.6. On 19 February 2008, Finance and Information Technology Committee approved an annual contribution of up to £2,500 to be made towards the cost of maintaining St Nicholas Church Tower. 3.7. In addition to the accounts position covered in section 4, this report will provide an up-to-date position on the planned maintenance and spend from the Lanark and Hamilton Common Good Funds (Sections 5 and 6), additional funding requests from Lanark Common Good (Section 7) and Hamilton Common Good (Section 8). 4. Common Good Annual Accounts 2024/2025 4.1. Appendix 1 to the report shows the unaudited accounts for 2024/2025. These form part of the Council’s unaudited accounts that were approved at the Risk and Audit Scrutiny Committee on 25 June 2025. The accounts show the income and expenditure made against Common Good in the last financial year. 4.2. The Appendix shows that as at the end of 2024/2025, the Advances to South Lanarkshire Council Loans Fund is £1.252 million. This is the cash that is held by the Council on behalf of the Common Good Funds, and which is readily available to meet expenditure. Table 1 provides the details across the Funds. Table 1 – Advances to South Lanarkshire Council Loans Fund Fund Lanark Biggar Hamilton Rutherglen Total £m £m £m £m £m Balance 0.318 0.026 0.775 0.133 1.252 4.3. It should be noted that these are the balances available as at 31 March 2025 and subsequent expenditure commitments will reduce these balances. The most significant commitment is the funding of up to £0.100 million from the Hamilton Common Good Fund towards the Hamilton Town Centre Masterplan approved by this Committee in May 2024. In addition, this paper provides details on future commitments totalling £0.130m from the Lanark Common Good Fund. 5. Lanark Repairs and Maintenance Budget – Planned Maintenance 2025/2026 5.1. As noted in 3.5. an annual budget of £15,000 is available for the maintenance of Common Good properties in Lanark. There is currently one commitment against this budget for 2025/2026 as noted below. 192
Page 193
5.2. Lanark Racecourse Equestrian Centre: The previous tenant vacated the property at the end of their lease in July 2025. Alternative use for the site is currently being considered, and whilst this is ongoing the site has been secured for health and safety purposes. A request to purchase fencing and to board up and secure the buildings has been approved from the planned maintenance budget at a cost of £5,540. 5.3. As reported to this Committee in August 2024, there were two projects to be approved from the 2024/2025 planned maintenance budget (5.4 and 5.5). An update on these two projects is provided below along with details of further work carried out under the 2024/2025 budget. 5.4. Tolbooth Roof Water Ingress: A survey of the roof at the property had identified a number of defects relating to flashings and coverings. The costs to rectify the issues have been quoted at £8,600 and are due to be carried out week commencing 22 September 2025. 5.5. Fence Repair at Cleghorn Road: The section of the fence at Cleghorn Road / Melvinhall Park which required repair to a damaged section has been undertaken by Community and Enterprise Resources and is now complete, with no charge to the Common Good Fund. 5.6. Tote Building Replacement of three Boarded Windows: Following storm damage, 3 of the boarded windows of the Tote building required replacement at a cost of £1,000. This work was carried out and completed in May 2025 and was approved from the remaining planned maintenance budget carried forward from 2024/2025. 6. Hamilton Repairs and Maintenance Budget – Planned Maintenance 2025/2026 6.1. Similarly, as noted in 3.5. an annual budget of £15,000 is also available for the maintenance of Common Good properties in Hamilton. 6.2. There are 2 commitments against this planned maintenance budget for 2025/2026 as noted below: 6.3. Cadzow Glen: Funding of £4,680 was approved to cover the costs incurred for repairs to the footpath and bridge at Cadzow Glen which are now complete. Removal of the old boardwalk will cost a maximum of £3,000 and has been approved through delegated authority. 6.4. Gatehouse, 65 Bothwell Road Investigate flooding on main entrance pathway: A cost of £1,750 has been approved, in order to carry out investigative work to identify the cause of flooding on the main entrance pathway to the property. The property is currently leased out. An update will be provided if the investigation highlights a need for further works. 6.5. During 2024/2025, there was a request for funding to refurbish the entrance gates for the children’s play park entrance at Bothwell Road park. This was approved under delegated authority from the planned maintenance budget for 2024/2025. Works have been carried out at a cost of £4,860. 193
Page 194
7. Lanark Common Good – Additional Funding Requests 7.1. A number of requests for funding have been received that are either not for repairs and maintenance or which cannot be approved under delegated authority due to level of the expected costs. 7.2. St Nicholas Church Tower: As reported to this committee in May 2024 and August 2024, the Heritage Architect’s report had been received and officers from Housing and Technical Resources were reviewing the document to determine what work was required and how the works could be progressed jointly with the Church. 7.3. Unfortunately, no alternative solutions were identified, and the recommendations remain the same as before, paint applied every 5 years with an annual washdown in between. 7.4. The cost relating to the church tower (£0.070 million) would be met from the Lanark Common Good Fund. This would involve cleaning lichen from the tower, re-painting of the tower walls, works to leadworks, replacement of rotten timbers, additional surveys, preliminaries, and scaffold. 7.5. Housing and Technical Resources have recently met with the Church for an update on how the joint project could move forward. The Church has advised that they have not yet secured the funding required and are looking to review the cost of the works. Any revisions to this cost that will impact on the Common Good, will be brought forward to this Committee. 7.6. Lanark Racecourse Equestrian Centre: As previously stated in paragraph 5.2, the stable buildings within the Equestrian Centre are to be reviewed, in order to determine whether any of the buildings require demolition or refurbishment. The outcome of the review will be provided in an update to this Committee. 7.7. Lanark Loch Car Park repair: Works required to repair the bottom car park at Lanark Loch car park at an estimated cost of £0.060 million, were approved by this committee in August 2024. 7.8. Drainage investigations carried out by the Council’s flood management section are now complete, with further works identified to be progressed alongside the resurfacing of the car park. The current drainage arrangement is unsuitable to be used going forward and it is recommended that the car park drainage is diverted into the Scottish Water scour pipe located beneath the car park. These findings have been passed to the Roads section in order to plan the next phase of work. 7.9. Gate required at Drove Road Path: A request to install a gate to deter use of dirt bikes on the Drove Road path estimated to cost £10,000 was approved by this committee in August 2024. The gate has now been installed at a lower cost of £3,190. 7.10. Lanark Common Good Fund currently has a cash balance held by the Council, and which is readily available to meet expenditure of £0.318 million. Excluding the £0.015m set aside for planned maintenance, £0.303 million is available to meet the proposed costs of £0.070 million (section 7.2 to 7.5), and the approved costs of £0.060 million (section 7.7). This would leave a balance of £0.173 million. 194
Page 195
8. Hamilton Common Good – Additional Funding Requests/Update 8.1. Requests for funding have been received that are either not for repairs and maintenance or which cannot be approved under delegated authority due to the level of the expected costs. 8.2. Former Vogue Bingo Site: In May 2025, Building Standards obtained three independent surveys of the structure from different perspectives (valuation, structure, and heritage) and the conclusion of each report was that the building is in an unsafe condition and that demolition is recommended. As a result, a Dangerous Building Notice was served on the Council on 17 June 2025 in line with relevant regulations. 8.3. Legal Services have been considering the implications of this on the ability to demolish and what requirements need to be met before demolition can take place. 8.4. Following the serving of a Dangerous Building Notice, an application must be made to Historic Environment Scotland (HES) to remove the Listed Building designation (Grade B). A Listed Building Application is being prepared and will be submitted for the demolition of the façade. This will be subject to a public consultation period in which objections can be received from the public. 8.5. The Dangerous Building Notice gives the option to reinstate or demolish the facade. Given the extent and cost of reinstatement required, coupled with the fact that securing development on the site has historically been unsuccessful over a period of 28 years, with interested parties quoting the façade as a barrier to development, demolition is considered the only feasible option. 8.6. A demolition contractor is being procured and, subject to approval, demolition could take place during September 2025. 8.7. Given a gap site will be created on completion of the demolition, it is proposed that a fence and a landscaped edge be created whilst redevelopment options for the site are considered. This will be carried out following demolition of the property. 8.8. An update will be provided to this Committee once demolition costs are identified for approval. 8.9. Hamilton Town Square: A contribution from Hamilton Common Good Fund of £0.100 million was approved in May 2024. An external Project Management Team has been appointed to take the project forward to the next stage. 8.10. Hamilton Common Good Fund currently has a cash balance held by the Council, and which is readily available to meet expenditure of £0.775 million. Excluding the £0.015m set aside for planned maintenance, £0.760 million is available to meet proposed costs which may arise, and the approved costs of £0.100 million (section 8.9). This would leave a balance of £0.660 million. 9. Employee Implications 9.1. None 10. Financial Implications 10.1. All costs identified will be met from the Common Good funds held for Lanark and Hamilton. 195
Page 196
11. Climate Change, Sustainability and Environmental Implications 11.1. There are no implications for climate change, sustainability or the environment in terms of the information contained in this report. 12. Other Implications 12.1. The ongoing repairs and maintenance support the viability of Common Good assets and reduces the Council’s risk to increased liabilities in the future. 13. Integrated Impact Assessment and Consultation Requirements 13.1. This report does not introduce a new policy, function or strategy or recommend a change to an existing policy, function or strategy and, therefore, no impact assessment is required. 13.2. There is also no requirement to undertake any consultation in terms of the information contained in this report. Jackie Taylor Executive Director (Finance and Corporate Resources) 15 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective, efficient and transparent Previous References Common Good Update Report, 22 May 2024 Common Good Update Report, 21 August 2024 List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Lorraine O’Hagan, Head of Finance Ext: 2601 (Tel: 01698 452601) E-mail: lorraine.ohagan@southlanarkshire.gov.uk 196
Page 197
Appendix 1 2024/2025 Annual Accounts Lanark Biggar Hamilton Rutherglen Total £000 £000 £000 £000 £000 Income and Expenditure Accounts Income for the Year 740 1 253 6 1,000 Expenditure for the Year (714) - (96) (1) (811) Surplus / (Deficit) to the Balance Sheet 26 1 157 5 189 Balance Sheet Fixed Assets Property, Plant and Equipment 1,659 - 1,517 - 3,176 Investments Advances to South Lanarkshire Council Loans Fund 318 26 775 133 1,252 Debtors - - - - - Total Assets 1,977 26 2,292 133 4,428 Current Liabilities Creditors (4) - (17) - (21) Total Assets less Current Liabilities 1,973 26 2,275 133 4,407 Represented By: Common Good Account 1,207 25 1,526 128 2,886 Surplus / (Deficit) 26 1 156 5 188 Amortisation of Revaluation Reserve 6 - 8 - 14 Gain / Loss on Revaluation (58) - - - (58) 1,181 26 1,690 133 3,030 Revaluation Reserve Opening Balance 790 - 593 - 1,383 Gain / Loss on Revaluation 8 - - - 8 Amortisation of Revaluation Reserve (6) - (8) - (14) Closing Balance 792 - 585 - 1,377 Total 1,973 26 2,275 133 4,407 197
Page 198
198
Page 199
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Council Tax Paperless Billing 1. Purpose of the report 1.1. The purpose of the report is to: - provide information on the planned introduction of the option for customers to access paperless Council Tax billing in 2025/2026 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendation(s):- (1) that the introduction of optional paperless billing for Council Tax from October 2025 be noted. 3. Background 3.1. South Lanarkshire Council has more than 160,000 domestic properties subject to a Council Tax charge. Billing takes place annually in March each year, as part of a bulk exercise, to notify all households of their Council Tax charge and payment terms for the forthcoming year. Billing also takes place daily throughout the year as new properties become liable for Council Tax and changes in circumstances are processed for existing properties. 3.2. Currently all Council Tax bills are printed and enveloped by Adare SEC and posted via Royal Mail economy post. Around 160,000 annual bills and 110,000 daily bills are printed and posted each year. 3.3. The printing and postage costs associated with issuing 160,000 Council Tax bills in March 2025 was £0.128 million equating to £0.80 per bill. 4. Paperless Billing 4.1. The provision of paperless billing will build on the existing MyAccount services already available to customers who wish to view their Council Tax information online. Existing services include updating contact details, setting up a direct debit, change of address, applying/cancelling a single person discount and view the date and value of last payment. 4.2. The Council currently has over 18,000 registered MyAccount users with active Council Tax accounts out of the Council’s 160,000 domestic property base. Current users are already able to view their Council Tax bill; however, they currently receive a paper bill each year. 17 199
Page 200
4.3. The ‘Citizen Access Revenue’ platform provided by the Council Tax systems provider NEC Software Solutions, integrates with the mygov.scot MyAccount platform provided by The Improvement Service. All customers wishing to use the paperless billing feature will need to have a registered MyAccount with mygov.scot. 4.4. Customers who sign up for paperless billing would no longer receive a paper bill and any changes to their bill after signing up would be notified in an email. Customers can contact the Council Tax team should they wish to revert to receiving paper bills. 4.5. The intention is to adopt a ‘soft launch’ from October 2025 prior to annual billing in 2026. 4.6. There are 2 processes for signing up for paperless billing dependent on whether the customer has an existing MyAccount. Existing users can register for paperless billing from the ‘popular services’ link within their account. For customers who do not have a MyAccount, they will have to register with MyGov.Scot. 5. Other Councils 5.1. The Council surveyed other councils, through the Institute of Revenue, Rating and Valuation (IRRV), on their position on paperless billing and received 12 out of 31 possible responses. Of the responses received, 6 currently offer paperless billing with the other councils working towards providing this offering in the future. 5.2. Of those councils who currently offer paperless billing, uptake has been variable but generally low ranging between 4.65% and 22%. Councils have commonly stated it has been challenging to improve take-up levels. 5.3 None of the councils who responded have so far implemented paperless billing across their full Council Tax caseload on the basis that council taxpayers have to opt out to continue to receive paper bills. One council, however, has implemented this on a limited basis for customers who receive Council Tax Reduction. 6. Next Steps 6.1 A range of activity will take place prior to October 2025 including the completion of end-to-end systems testing and promotional activity. Feedback will also be sought from customers in advance of the annual billing exercise for 2026/2027 with further promotional activity also taking place. 7. Employee Implications 7.1. There are no employee implications from this report. 8. Financial Implications 8.1. Savings will be dependent on the level of uptake achieved from the promotional activity. On the basis that the current 18,000 registered MyAccount users sign up for paperless billing only, a saving of £0.014 million could be expected at annual billing based on a cost of £0.80 per paper bill. Assuming around 20% of these cases receive more than one bill per year, additional savings of around £0.003 million could be expected. 200
Page 201
9. Climate Change, Sustainability and Environmental Implications 9.1. There are no anticipated implications for climate change, sustainability, or the environment arising from this report. 10. Other Implications 10.1. Paperless billing may assist in the overall shift towards digital service delivery and an improvement in the number of residents who sign up to MyAccount improving access to other services that use MyAccount. 10.2. Recovery documents will not be affected by paperless billing settings and the customer will still be sent recovery documents via post because the current legislation requires a paper notice to be issued to all liable parties before the Council can petition the court for a Summary Warrant. A customer can also view any recovery documents sent by post by signing into their account. 11. Integrated Impact Assessment and Consultation Requirements 11.1. An Integrated Impact Assessment has been completed and is available from the Council’s website via the link https://www.southlanarkshire.gov.uk/info/200172/plans_and_policies/2250/integrated _impact_assessments Information on customer use and feedback will be gathered during the soft launch phase. 11.2. Paperless billing is being started as a ‘soft launch’ and feedback from customers will be considered for future developments. It is an opt-in process for customers building on the functionality already available in MyAccount. Jackie Taylor Executive Director (Finance and Corporate Resources) 7 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective and efficient Previous References None List of Background Papers None Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Craig Fergusson, Head of Finance (Transactions) Telephone: 01698 454951 E-mail: craig.fergusson@southlanarkshire.gov.uk 201
Page 202
202
Page 203
Report Agenda Item Report to: Finance and Corporate Resources Committee Date of Meeting: 10 September 2025 Report by: Executive Director (Finance and Corporate Resources) Subject: Money Matters Advice Service Annual Report - 2024/2025 1. Purpose of Report 1.1. The purpose of the report is to:- provide the Committee with the Money Matters Advice Service (MMAS) Annual Report for 2024/2025 [1purpose] 2. Recommendation(s) 2.1. The Committee is asked to approve the following recommendations:- (1) that the content of the MMAS Annual Report for 2024/2025 be noted. 3. Background 3.1. MMAS is the Council’s dedicated, free, and confidential advice service, supporting residents with welfare rights, money and debt advice, energy assistance, and crisis intervention. 3.2. In 2024/2025, the Service operated against the backdrop of:- continuing cost-of-living pressures a declare housing emergency (June 2024) increased demand from residents experiencing financial hardship, housing instability, and fuel poverty 3.3. MMAS is accredited to Type II and Type III under the Scottish National Standards for Advice and Information Providers (SNAIP), demonstrating high-quality casework and specialist advice capability. Standard 2.5 of SNAIP require all services to regularly review their work against the aims and objectives for their service and make the results of these reviews available in a publicly accessible format at least once a year. An annual report is considered the most appropriate format to do this. 4. Annual Report 4.1. The Annual Report attached as Appendix 1 provides:- Key outcomes – presented in a “Year in Numbers” infographic and detailed in narrative form. Team performance reports – Community Wellbeing Team, Welfare Rights Team, and Money Advice Team. Strategic themes – including child poverty, housing emergency response, community hubs, and targeted partnership projects. 18 203
Page 204
Client demographics – analysis by gender, income, health, SIMD, and electoral wards. Customer feedback – results of satisfaction surveys. Case studies – illustrating the impact of advice on individuals and families. Outcomes by Electoral Ward – key statistics relating to service delivery broken down by electoral ward. 5. Key Outcomes 5.1. The Money Matters Advice Service continues to be at the frontline of tackling poverty, supporting vulnerable residents, and delivering strong economic and social value for South Lanarkshire. 5.2. Financial Gains: MMAS secured £27.15 million in financial gains for clients in 2024/2025, through successful welfare benefit claims, appeals, and debt solutions. This represents a direct and significant boost to the incomes of households across South Lanarkshire. 5.3. Return on Investment: For every £1 invested by the Council, MMAS delivered £12.47 in financial benefit to residents. This demonstrates the cost-effectiveness of the service and its contribution to both household income and the wider local economy. 5.4. Client Reach and Demand: The Service supported 12,404 unique clients and opened 41,339 new cases during the year. This sustained level of demand highlights the essential role MMAS plays in supporting households under pressure from the cost-of- living crisis and housing emergency. 5.5. Debt Advice and Outcomes: The Money Advice Team worked with almost 2,000 new clients, addressing over £11 million of problem debt. Importantly, £2.28 million of debt was written off, allowing individuals and families to regain financial stability and avoid escalation into crisis. 5.6. Crisis Response: Immediate assistance continued to be delivered at scale:- 4,840 energy voucher referrals supported households at risk of fuel disconnection 2,333 foodbank referrals ensured families had access to essentials in emergencies 4,821 Cash First vouchers provided same-day £50 payments to residents, allowing dignity and choice during times of acute need 5.7. Reaching the Most Deprived Communities: Analysis of client postcodes shows that 23% of MMAS clients live in the 10% most deprived areas of Scotland (SIMD 1). In total, 79% of all clients live in the lower half of SIMD rankings, confirming the service is reaching those most at risk of poverty and exclusion. 5.8. Client Experience and Satisfaction: Customer feedback remained highly positive:- average service rating of 4.79 out of 5 87.1% of clients gave MMAS a full 5-star rating 93.5% said they would recommend the service to family or friends. 5.9. These outcomes highlight MMAS’s continued impact as a frontline service: maximising household income, preventing homelessness, reducing fuel and food insecurity, and providing financial stability for residents. 204
Page 205
5.10. The Annual Report will be published on the Council’s website. 6. Employee Implications 6.1. There are no employee implications from this report. 7. Financial Implications 7.1. There are no financial implications from this report. 8. Climate Change, Sustainability and Environmental Implications 8.1. There are no anticipated implications for climate change, sustainability, or the environment arising from this report. 9. Other Implications 9.1. There are no other implications from this report. 10. Integrated Impact Assessment and Consultation Requirements 10.1. An integrated Impact Assessment is not required. Jackie Taylor Executive Director (Finance and Corporate) 20 August 2025 Link(s) to Council Values/Priorities/Outcomes Accountable, effective, efficient and transparent Previous References None List of Background Papers MMAS Annual Report 2024/2025 Contact for Further Information If you would like to inspect the background papers or want further information, please contact:- Craig Fergusson, Head of Finance (Transactions) Ext: 4951 (Tel: 01698 454951) E-mail: craig.fergusson@southlanarkshire.gov.uk 205
Page 206
206
Page 207
18 207
Page 208
Contents 1. Year in Numbers 2. Introduction 3. How we Calculate Financial Gains 4. Community Wellbeing Team 5. Welfare Rights Team 6. Money Advice Team 7. Empowering Communities: The Role of MMAS Community Hubs 8. Supporting Vulnerable Groups in South Lanarkshire 9. Cash First Project 10. Cash First Client Profile and Impact Summary (2024–25) 11. Project Work: Targeted Support Through Strong Partnerships 12. Achieving Accreditation: Scottish National Standards for Advice and Information Providers 13. Supporting South Lanarkshire’s Child Poverty Commitments 14. Responding to South Lanarkshire’s Housing Emergency 15. Client Demographics 2024–25 16. Clients by SIMD Area 17. Reaching Clients Across South Lanarkshire 18. Customer Satisfaction – Listening to the Voices of Residents 19. Case Studies 20. Appendix: Electoral Ward Update 208
Page 209
209
Page 210
2. Introduction This year’s report provides an overview of our work supporting individuals and families facing financial hardship across South Lanarkshire—and highlights the essential role MMAS continues to play in tackling fuel poverty, child poverty, the housing emergency, and wider inequalities in health and wellbeing. Money Matters Advice Service (MMAS) is South Lanarkshire Council’s dedicated advice service, offering free, confidential support on welfare benefits, energy advice, problem debt, and crisis assistance. At a time when the cost-of-living crisis continues to impact households across the region, our service has remained at the frontline of support—helping people maximise their income, access vital benefits, reduce debt, and stabilise their housing and energy situations. “Money Matters has possibly been a life saver for me. It was the DWP I was dealing with. It has been almost 6 months now where the pressure was taken off me thanks to Money Matters. There are still a few things to tie up. Then I can get on with enjoying my Retirement without any further issues.” We have continued to strengthen our response to fuel poverty through our partnerships with SGN and the Fuel Bank Foundation, particularly among residents who rely on prepayment meters. Our advisers provide energy efficiency advice, support access to fuel vouchers, help with charitable energy funds, and ensure clients are on energy providers' Priority Services Registers. In the fight against child poverty, MMAS plays a critical role by securing benefits such as Scottish Child Payment and Best Start Grants, ensuring that families receive their entitlements and gain the financial security needed to support their children’s wellbeing and future. Following the Council’s declaration of a housing emergency in June 2024, MMAS has expanded its efforts to prevent homelessness. Through advice on mortgage and rent arrears, Discretionary Housing Payment applications, and income maximisation, we support residents to remain in their homes and avoid crisis escalation. This year also marked significant progress in the Council’s involvement with the Marmot Project, which aims to reduce health inequalities by addressing their social causes. MMAS contributes directly to this goal by promoting financial security, enabling people to take control of their circumstances, and offering support that upholds dignity and fairness. As this report shows, MMAS remains a key strategic partner in building a fairer, healthier South Lanarkshire. 210
Page 211
3. How we Calculate Financial Gains Money Matters Advice Service (MMAS) is frequently asked how it calculates and report the financial gains achieved on behalf of our service users. Transparency and confidence in our reporting are essential, as these figures are a critical measure of our impact across South Lanarkshire. We use the AdvicePro case management system, developed by Advice UK, a national charity supporting advice services. This system is widely used across the UK—particularly within local authority advice services—and is tailored to record welfare rights, energy, and money advice outcomes. Advisers input financial results in real time, which are then aggregated using an automated, nationally recognised calculation process. Our methodology aligns with standards agreed in partnership with the Improvement Service under the Scottish Government-funded Advice Insights Project. This framework ensures that all local authorities and funded advice agencies report data consistently, allowing for benchmarking and performance evaluation across services such as MMAS and Citizens Advice Bureaux. Financial gains from welfare benefits are calculated in two parts: (1) ongoing entitlements are annualised—projected over a 12-month period or shorter if applicable—and (2) lump-sum, backdated, or one-off payments are added to determine the total gain. For instance, a client receiving £110.40 per week in Adult Disability Payment and a backdated award of £3,292.68 would have an annual gain of £9,033.48 (£3,292.68 + (£110.40*52)). Debt-related gains are reported only when debts are formally written off—through negotiation, dispute resolution, or statutory options like bankruptcy. While reduced monthly payments (e.g., through the Debt Arrangement Scheme) can significantly benefit clients, these are not included under national reporting guidance, meaning the true financial benefits of the service are often underreported, Return on Investment (ROI) is another key metric for evaluating the value of our service. This compares the total financial gain achieved for clients against the cost of running the service. In 2024-25, MMAS helped secure over £27.1 million in financial gains. With annual running costs for South Lanarkshire Council of around £2.18 million, this equates to a return of more than £12.47 for every £1 invested by South Lanarkshire — a strong ROI that underscores the economic and social value of our work. All reported gains are verified—either through client confirmation or official award letters, unless awards are automatic (e.g., Child Benefit), in which case verification is not required. Our robust internal audit process, recently validated through the Scottish National Standards accreditation process, ensures continued accuracy and integrity in our reporting. 211
Page 212
4. Community Wellbeing Team The Community Wellbeing Team continues to be the first point of contact for clients accessing the Money Matters Advice Service. Since taking over the triage function in late 2023, the team has been instrumental in delivering same-day crisis support while ensuring that clients are swiftly directed to the most appropriate service within the wider team. In 2024–25, the team handled more than 23,263 telephone enquiries (an increase of 5% on 2023-24 figures) and processed 5,943 digital referrals via the Council’s website (up 23% from 2023-24). With a 97% success rate for same-day processing of foodbank and fuel support referrals, the team remains a vital safety net for South Lanarkshire residents facing immediate hardship. As part of its crisis response, the team administered 4,634 Cash First cases and made 2,333 referrals to food banks, often acting as a major line of support for clients struggling with sudden financial shocks, such as bereavement, unemployment, or unexpected household costs. The team worked in close partnership with Hamilton, East Kilbride, and Clydesdale Citizens Advice Bureaux to deliver the Cash First initiative, ensuring clients had access to practical and immediate financial help. “Have used this service a few times and can honestly say all staff that I have interacted with have been very helpful and supportive.” Beyond crisis intervention, the Community Wellbeing Team conducts Financial Wellbeing Checks, including benefit checks, to identify income maximisation opportunities and ensure no entitlement goes unclaimed. Many clients are also signposted to the Money Advice or Welfare Rights Teams for ongoing support with debt or benefit issues, ensuring that short-term help is matched with longer-term solutions. The human impact of this work is significant. Whether helping a bereaved widow navigate new entitlements or supporting a single father with children during the school holidays, the team’s work consistently prevents financial distress from escalating into deeper poverty. Feedback from both clients and external reviews has highlighted the professionalism, compassion, and efficiency of the team. As MMAS’ first line of defence against financial hardship, the Community Wellbeing Team continues to deliver accessible, person-centred support that reflects the values and aims of the wider Service. 212
Page 213
5. Welfare Rights Team The Welfare Rights Team plays a central role within the Money Matters Advice Service, ensuring that South Lanarkshire residents can access the full range of social security benefits and entitlements available to them. In 2024–25, the team continued to make a meaningful impact by securing financial stability for thousands of households, particularly those facing disadvantage due to ill-health, disability, unemployment, or low income. This year, the team supported over 10,798 individuals and families, delivering advice and Tribunal representation across a wide range of benefit issues. A total of £24.8 million in financial gains was generated on behalf of clients. These gains represent not only backdated awards and ongoing entitlements but also a lifeline for households struggling with the cost-of- living crisis, and emergency support provided by the Community Wellbeing Team. The team’s work spans the full spectrum of welfare rights support, including benefit checks, form-filling assistance, challenging decisions, return to work calculations and representation at tribunals. Specialist knowledge of complex benefits such as Adult Disability Payment (ADP), Pension Age Disability Payment (PADP), and Universal Credit (UC) ensures that residents receive expert help at every stage of the process. “Money matters have been a big help for me as I suffer from Dyslexia Dyscalculia and Dyspraxia. They have always been very understanding and helpful, helping me to fill out forms and understand information “ An essential part of the Welfare Rights Team’s success lies in its collaborative working across Council services and with external partners, including NHS Community Link Workers who are embedded in GP surgeries and our own Cost of Living worker who is embedded in Hairmyres Hospital. The team continues to prioritise early intervention and prevention. This year, to support this a focus was placed on assisting residents with managed migration onto Universal Credit and in supporting Kinship Carers who were at risk of experiencing a significant disadvantage as part of the transfer from legacy benefits like Child Tax Credits to Universal Credit. The Welfare Rights Team also delivered training sessions for front-line staff across the Council along with external partners, helping to strengthen the organisation’s ability to identify potential benefit entitlement and make timely referrals. By maximising household income, improving financial resilience, and reducing inequality, the Welfare Rights Team continues to be a vital part of South Lanarkshire’s efforts to address poverty and support the most vulnerable in our communities. 213
Page 214
6. Money Advice Team The Money Advice Team provides essential support to individuals and families struggling with problem debt and financial insecurity. In 2024–25, the team worked with over 1,990 unique new clients, helping them manage unmanageable debt, avoid crisis situations, and regain control over their finances. The team offers free, confidential, and impartial advice on a wide range of money matters, including rent and mortgage arrears, council tax debt, fuel debt, and credit card and loan issues. Advisors provide tailored budgeting support, negotiate affordable repayment plans with creditors, and offer support on formal debts solutions such as Debt Arrangement Schemes, Trust Deeds, and bankruptcy where appropriate. Over the past year, the Money Advice Team helped clients manage more than £11 million of problem debt. Beyond the figures, the impact on people’s lives has been profound helping to reduce stress, prevent eviction and homelessness, and improve overall wellbeing. With the cost-of-living crisis continuing to affect households across South Lanarkshire, demand for debt advice has remained high. The team has responded by increasing outreach through Community Hubs and working closely with other Council services such as Housing, Social Work and Benefit and Revenue services, to ensure that help is accessible when and where it is needed most. “I approached money matters 8 years ago to help with my debt, and they really helped. I am now out of the debt due to the help they provided and am extremely grateful. Thanks so much!” A key focus this year, has been on early intervention and prevention. The team has strengthened referral pathways with internal council services and third-sector partners, ensuring that clients are signposted to money advice at the earliest signs of financial difficulty. Also, in response to South Lanarkshire Council’s declared housing emergency, the Money Advice Team plays a vital role in preventing homelessness. The team supports residents facing rent or mortgage arrears by offering expert debt advice and negotiating affordable repayment plans. By addressing housing-related debt early, the service helps individuals and families to remain in their homes. This targeted intervention is a key part of the Council’s wider strategy to respond to growing housing pressures and continuing high demand for support. By helping residents to stabilise their financial situation and build long-term resilience, the Money Advice Team continues to play a vital role in reducing poverty and promoting financial inclusion across South Lanarkshire. 214
Page 215
7. Empowering Communities: The Role of MMAS Community Hubs The Money Matters Advice Service (MMAS) participates in several Community Hubs, and this is a cornerstone of our outreach strategy, bringing essential advice directly into South Lanarkshire’s neighbourhoods. These hubs operate as monthly drop-in centres, offering residents accessible, face-to-face support on issues ranging from benefit entitlements, energy advice and debt management. The hubs that MMAS participates in are community-led events, organised by local groups, with venues carefully selected to ensure they are within walking distance for many residents, especially those who may face challenges accessing online or centralised services. The importance of these hubs extends beyond convenience. They serve as vital touchpoints for early intervention, helping individuals and families address financial concerns before they escalate. By providing timely advice on benefit claims, debt solutions, and budgeting, the hubs play a crucial role in enhancing financial resilience within the community. “Amazing service. Invaluable to see and talk to someone face-to-face. Kept in touch by phone and email. Need more face-to-face appointments for people my age.” Moreover, the hubs foster a sense of community empowerment. Residents are not only recipients of advice but also active participants in their own wellbeing. This collaborative approach builds trust and encourages ongoing engagement with MMAS services. In addition to advice, the hubs also offer access to other resources such as carbon monoxide monitors, provided by our partners, SGN to address broader aspects of household safety and wellbeing. The success of the Community Hubs underscores the value of localised, accessible support services. As we look to the future, MMAS remains committed to expanding and adapting our community outreach to meet the evolving needs of South Lanarkshire’s residents. For more information on hub locations and schedules, please visit the MMAS page on South Lanarkshire Council website. 215
Page 216
8. Supporting Vulnerable Groups in South Lanarkshire The Money Matters Advice Service (MMAS) plays a critical role in supporting vulnerable individuals and families across South Lanarkshire. As detailed in this report MMAS provided tailored support to over 12,400 clients in 2024-25, delivering £27.15 million in financial gains through welfare benefits and debt advice and by providing emergency assistance. A significant proportion of MMAS clients face multiple vulnerabilities: 56% are women, 30.93% are economically inactive due to sickness or disability, and 51% have incomes under £6,000. Notably, 84% of clients report a health condition, including 38% with mental health challenges. The service also sees high engagement from single-parent households and from individuals over the age of 60, who are at increased risk of isolation and energy poverty. MMAS plays a crucial role in supporting individuals living in the most deprived communities, with 80% of clients coming from areas ranked within deciles 1–5 of the Scottish Index of Multiple Deprivation (SIMD). These communities often encounter significant barriers to accessing mainstream support, and MMAS provides a vital bridge—ensuring fair and inclusive access to entitlements and advice for those who need it most. “If the person I was speaking to didn't deal with the issues I brought up, they forwarded me to someone who could.” Vulnerable groups in South Lanarkshire often face complex challenges—ranging from delays in accessing benefits to difficulties navigating appeals processes and managing debt. MMAS plays a vital role in addressing these issues by offering timely, expert support that can prevent financial crises and reduce reliance on emergency resources such as food and fuel banks. The service also complements and relieves pressure on other frontline agencies, such as Citizens Advice Bureaux, by offering specialist guidance tailored to individual circumstances. MMAS remains committed to prioritising those most in need, ensuring that disabled individuals, single parents, older adults, and low-income households receive the support they require. By focusing on emergency triage and holistic advice, MMAS helps clients build long-term financial resilience and navigate periods of hardship with greater confidence and stability. In short, MMAS does more than provide advice—it protects the most vulnerable, reduces poverty, and helps uphold the dignity and wellbeing of South Lanarkshire’s residents. The service is essential for many of our clients and often transformative for those most in need. 216
Page 217
9. Cash First Project Launched in October 2023 by Money Matters Advice Service (MMAS) and funded by South Lanarkshire Council through the Local Authority COVID Economic Recovery (LACER) Fund, the Cash First Scheme has been delivering rapid financial relief to residents in crisis. Building on the success of the Financial Wellbeing Support Fund (June 2022–June 2023), this initiative has taken a more direct and responsive approach—providing £50 emergency PayPoint vouchers for households experiencing food or fuel insecurity. Unlike its predecessor, which linked support to advice engagement, Cash First puts dignity and autonomy at the heart of its intervention. Vouchers can be used at local retailers, offering recipients choice and control in times of acute financial stress. The program was awarded £425,000 in August 2023, aiming to assist 4,250 households annually through to August 2025. Eligibility criteria remain deliberately inclusive: any South Lanarkshire resident experiencing a food or fuel emergency, and who has not accessed the scheme within the past three months, may apply—regardless of employment status. “Considering how busy they are, I found accessing the service really easy and they also explained very clearly the waiting times due to high demand” In recognition of the hardship caused by the transition to Universal Credit, the scheme was further expanded in Autumn 2024 to support claimants migrating from legacy benefits. Administered by MMAS’s Community Wellbeing Team, Cash First also benefits from trusted delivery partnerships with East Kilbride, Lanark, and Hamilton Citizens Advice Bureaux. These organisations provide same-day responses and address underlying issues through referral to specialist welfare rights, money, or energy advice services. In doing so, the scheme not only resolves immediate emergencies but also strengthens long-term financial resilience across South Lanarkshire. Overview of Scheme Delivery (2024–25) During the financial year 2024–25, the scheme continued to provide vital assistance across all 20 South Lanarkshire electoral wards. • Total Unique Clients Assisted: 3,287 • Total Cases Managed: 4,634 • Number of Vouchers issued (including re-issues): 4,821 • Delivery Time: 96.4% delivery on same day of application. 217
Page 218
10. Cash First Client Profile and Impact Summary (2024–25) Age Profile: o Majority working age clients (16–59 years = 84%) o Largest age groups: 35–44 (27%) and 45–59 (31%) o Older clients (60+) represent 15% Gender Breakdown: o Female clients: 55% o Male clients: 43% o Small % prefer not to say or not recorded Household Composition: o Single adult households: 65% o Single parent households: 25% o Couples with children: 4% o Couples without children: 6% Economic Status: o Permanently sick or disabled: 33% o Registered unemployed: 32% o Employed (full or part-time): 10% o Carers, students, others make up remainder Housing Status: o South Lanarkshire Council and registered social landlord tenants: 68% o Private rentals: 8% o Temporary accommodation: 5% o Homeowners (mortgage/no mortgage): 7% o Nearly 80% live in most deprived areas (Scottish Index of Multiple Deprivation) Reasons for Referral: o Rising cost of essentials: 33% o Impact of physical/mental health conditions: 25% o Priority debt: 7% o Unexpected expenses and benefit delays also noted Financial Gains (2024–25): * o Over £6.5 million in additional benefits gained o £920,000 in debt written off o Reflects effective holistic and person-cantered support * These outcomes reflect both enhanced support for existing MMAS clients who accessed Cash First and successful referrals from the Community Wellbeing Team to the Money and Welfare Benefits Teams following initial engagement with Cash First. This illustrates the substantial financial gains made possible through the holistic, person-centered approach taken by Cash First. 218
Page 219
11. Project Work: Targeted Support Through Strong Partnerships The Money Matters Advice Service continues to deliver a range of targeted projects in partnership with key agencies, ensuring that support reaches those most at risk of poverty, poor health, and financial exclusion. In 2023–24, our project work has expanded both in reach and impact, offering tailored advice and income maximisation support across diverse settings. SGN Energy Project Funded by SGN, this project focuses on reducing fuel poverty for vulnerable households. Advisors offer support to residents through our Helpline and Community Hubs and help clients access energy vouchers, CO Monitors, apply for Warm Home Discounts, and challenge high energy bills. This project is the latest development in MMAS’s efforts to play a vital role in supporting households during the ongoing cost-of-living crisis and has now expanded to include increasing take up or Priority Service Registration with energy providers and Scottish Water and having discussions with residents on the risk of CO poisoning. Macmillan Cancer Support Project In partnership with Macmillan Cancer Support, this project provides specialist welfare rights advice to people living with cancer. Advisors work closely with patients and clinical teams to ensure individuals and families receive the financial support they are entitled to at every stage of their cancer journey. The service helps reduce stress and financial hardship during a profoundly difficult time. Telephone Advice Line – Families with Young Children Our Telephone Advice Line Service offers tailored support for families with children under five or expecting their first child. This service helps young families navigate the benefits system, access maternity and early years entitlements, and address debt issues. The project supports early intervention and contributes to reducing child poverty from the earliest stage. NHS Financial Wellbeing Project Working in partnership with NHS Lanarkshire, this project provided specialist welfare rights advice to clients of GP-based NHS Community Link Workers. Together with MMAS, they provided a holistic approach to health and wellbeing by addressing underlying money worries. Clients were supported with benefit checks, debt advice, and onward referrals to other specialist services. 219
Page 220
NHS Cost of Living Project – Hairmyres Hospital Embedded within Hairmyres Hospital, this project offers immediate financial advice and support to NHS Teams and their patients affected by the cost-of-living crisis. The on-site advisor works with clinical staff to raise awareness of support available and identify the needs of patient, whilst delivering rapid, compassionate support when required. Employability Project – SLC Employability Services In partnership with South Lanarkshire Council’s Employability Services, this project helps individuals overcome financial barriers to work. Our adviser provides benefits and debt advice to support clients as they prepare for, return to, or sustain employment— ensuring they can transition into work without risking financial hardship. Together, these projects demonstrate the value of integrated services that meet people where they are—at home, in hospital, or in the community—and ensure that financial wellbeing is recognised as a fundamental part of wider health and social outcomes. Households in Fuel Crisis - Fuel Bank Foundation In 2024–25, Money Matters Advice Service continued its valuable partnership with the Fuel Bank Foundation to support households facing energy hardship. Over the year, 4,769 referrals were made on behalf of 2,309 individual clients, providing comprehensive energy advice and tailored assistance. As part of this support, 4,300 emergency top-up vouchers were issued to help clients maintain access to gas and electricity during times of acute need. These vouchers, totalling £214,496 in value, provided a vital safety net for vulnerable individuals and families experiencing fuel poverty. . 220
Page 221
12. Achieving Accreditation: Scottish National Standards for Advice and Information Providers This year, Money Matters Advice Service proudly achieved accreditation to Type II and Type III under the Scottish National Standards for Advice and Information Providers. This recognition reflects our ongoing commitment to delivering high-quality, person-centred advice services that meet the rigorous standards expected across Scotland. Accreditation to Type II demonstrates that our organisation provides casework support, where staff take active steps on behalf of clients, often involving more complex issues that require intervention, representation, or negotiation. Our advisors work directly with clients to manage multiple issues, liaise with creditors or benefit agencies, and ensure follow-up until matters are resolved. This level of support is particularly important for individuals experiencing significant financial distress or multiple vulnerabilities. Our Type III accreditation is a testament to our ability to deliver specialist advice, particularly in the areas of welfare rights and debt. Type III services require specialist knowledge and technical expertise, with strict quality assurance processes in place. This level of recognition confirms that Money Matters is equipped to handle the most complex cases, providing in-depth advice and robust representation where needed, including appeals and tribunal work. Achieving and maintaining these standards required a comprehensive internal review, staff development, and investment in our systems and processes. We are proud of the hard work and dedication shown by our entire team throughout the accreditation process These accreditations give our clients, funders, and partners confidence in the quality and professionalism of the services we provide. They also affirm our place as a trusted advice provider, committed to the continuous improvement and delivery of vital support to those who need it most. Money Matters will continue to uphold these standards as we look to the future, ensuring we remain a reliable and expert source of money and welfare guidance. 221
Page 222
13. Supporting South Lanarkshire’s Child Poverty Commitments The Child Poverty (Scotland) Act 2017 places a legal duty on local authorities to take meaningful action to reduce child poverty. South Lanarkshire Council’s Child Poverty Action Report 2023–2026 outlines a strategic commitment to address the three key drivers of poverty: income from employment, cost of living, and income from social security and benefits in kind. The Money Matters Advice Service (MMAS) is central to the delivery of this agenda, providing essential frontline support to families across the region. In 2024–25, MMAS made a substantial impact by supporting 14,248 unique clients—12,404 of them new—and securing £27.15 million in financial gains for residents. This direct injection of income into low- income households has a powerful stabilising effect, helping to reduce financial stress and lift children out of poverty. A core function of MMAS is ensuring families receive their full entitlement to benefits. The service assists with claims, provides support through appeals, and helps manage debt—work that significantly boosts household income. In cases of acute need, MMAS facilitates crisis intervention by providing emergency support such as fuel top-ups, with 4,840 referrals for vouchers issued last year alone. To address the growing pressure of living costs, MMAS also played a key role in administering the Council’s Cash First Scheme. Over 4,821 cash payments of £50 were issued to households facing food and fuel insecurity (including reissues), with 96% of successful applicants receiving funds on the same day. This fast, stigma-free support helped families meet urgent needs with dignity. Beyond direct financial support, MMAS strengthens the Council’s broader poverty response through partnership working. The service collaborates with community groups, shares training and resources with other Council teams, and supports early intervention. It also works closely with the Council’s Employability Service to help families boost their long-term earning potential. Through this holistic, rights-based approach, MMAS continues to be a cornerstone of South Lanarkshire’s efforts to reduce child poverty and meet its statutory obligations—ensuring children and families have the support they need to thrive. 222
Page 223
14. Responding to South Lanarkshire’s Housing Emergency In June 2024, South Lanarkshire Council officially declared a housing emergency in response to a sharp rise in homelessness and housing insecurity across the region. With a 28% increase in homelessness applications and a doubling of the backlog of households in urgent need, the scale of the crisis is both significant and concerning. Money Matters Advice Service (MMAS) has played a central role in helping to mitigate the worst effects of this emergency by supporting residents to stay in their homes, prevent homelessness, and access the help they are entitled to. Our specialist teams deliver advice that addresses the underlying causes of housing instability—such as rent arrears, delays in benefit payments, unaffordable debt, and gaps in income. Our Welfare Rights Team works to ensure clients receive the full range of benefits available to them, including Discretionary Housing Payments (DHP), Housing Costs in Universal Credit and Housing Benefit, and challenges unfair decisions that threaten housing stability. The Money Advice Team supports individuals to manage problem debt, negotiate repayment plans for rent or mortgage arrears, and access statutory debt solutions that can relieve pressure and protect homes. MMAS also provides a vital frontline response through the Community Wellbeing Team, who deliver same-day emergency support—such as Cash First vouchers—to residents in food and fuel crises, often helping to bridge gaps that might otherwise lead to people going into arrears. Our person-centred, holistic approach reflects the Council’s wider commitment under the Marmot Project to tackle the social determinants of poor health—such as inadequate housing and financial insecurity. By reducing eviction risk, improving income stability, and linking individuals with long-term support, MMAS directly contributes to housing security and better life outcomes. As the housing emergency continues, MMAS remains committed to playing a proactive, integrated role in helping the most vulnerable residents of South Lanarkshire stay housed, supported and empowered. 223
Page 224
15. Client Demographics 2024–25 The demographic profile of Money Matters Advice Service (MMAS) clients in 2024–25 offers valuable insight into the diversity and needs of the individuals and households we support. Gender and Age Our client base continues to be predominantly female, with women accounting for 56% of all service users, compared to 42% male, and 2% not recorded or identifying otherwise. In terms of age, the majority of clients fall within the 45–59 age bracket (26%), followed by those aged 35–44 (18%) and 25–34 (14%). Notably, 15% of clients are over the age of 71, indicating ongoing engagement with older adults. Income and Economic Status MMAS clients are primarily on low incomes. Over half (51%) have an income below £6,000 per year, with a further 19% earning between £6,001 and £10,000. Employment status data reveals that 14.66% of clients are unemployed, while 14.18% are employed, and 15.80% are retired. Significant numbers are also recorded as sick or disabled (30.93%). Health and Disability A substantial 84% of clients report having a health problem, with 62% of those health problems relating to physical health and 38% to mental health issues. Only 15% identify as carers, suggesting most clients require support rather than are providing it. Additionally, 30% of clients are registered on the Priority Service Register, indicating vulnerability in relation to utilities and other essential services. Household and Housing Circumstances The most common household type is single person (58%), highlighting the prevalence of isolated individuals within our client base. Couples without children make up 19%, single parents 15%, and couples with children 8%. In terms of housing, the majority live in local authority or housing association accommodation (Scottish Secure Tenancies) (46%). Those living in private tenancies only account for 6%, whilst homeowners account for 23% of all clients. Conclusion The demographic data underscores the economic vulnerability, health challenges, and housing insecurity faced by many MMAS clients. This profile strengthens our case for targeted advice and support services tailored to low-income individuals, older adults, single-person households, and those with complex health and housing needs. 224
Page 225
56% 42% 2% 0% 10% 20% 30% 40% 50% 60% Female Male Not Recorded/Other Clients by Gender 51% 19% 15% 7% 3% 2% 2% 1% 0% 10% 20% 30% 40% 50% 60% Client Income Bands 58% 15% 19% 8% 0% 10% 20% 30% 40% 50% 60% 70% Single Person Single Parent Couple (No Children) Couple (with Children) Household Composition 14% 15% 1% 16% 31% 2% 3% 3% 15% Employed Unemployed Self Employed Retired Sick or Disabled In Education Home Keeper Carer Not Known Economic Status 23% 46%6% 1% 1% 7% 1% 2% 13% Homeowners Scottish Secure Tenancies Private Residential… Care Home Homeless Livign with Family/Lodgers Supported Accomodation Temporary Accomodation Other Housing Status 1% 7% 14% 18% 26% 10% 9% 15% 0% 5% 10% 15% 20% 25% 30% 0 - 15 16 - 24 25 - 34 35 - 44 45 - 59 60 - 64 65 - 70 71+ Clients by Age Range 225
Page 226
No, 85% Yes, 15% Is Client a Carer? No, 70% Yes, 30% Is client on Priority Service Register? Physical Health, 62% Mental Health , 38% Analysis of Health Issues Yes, 84% No, 16% Health Problem 226
Page 227
16. Clients by SIMD Area The Scottish Index of Multiple Deprivation (SIMD) is a relative measure used to identify levels of deprivation across 6,976 small geographic areas in Scotland, known as data zones. An area being classified as 'deprived' can indicate low income but also reflects limited access to resources and opportunities. SIMD assesses deprivation across seven key domains: income, employment, education, health, access to services, crime, and housing. Using client postcodes, Money Matters can map the distribution of its service users across these data zones, with a ranking scale from 1 (most deprived) to 10 (least deprived). Analysis of this data reveals that: • 23% of Money Matters clients live in the 10% most deprived areas of Scotland (SIMD 1), representing an increase of 1% from 2023-24. • A further 16% live in areas ranked within the next most deprived 10% (SIMD 2), representing a 1% decrease from 2023-24. • In total, 79% of clients reside in data zones within the bottom half of the SIMD rankings. These findings clearly demonstrate that Money Matters Advice Service is effectively reaching those most impacted by deprivation, particularly within South Lanarkshire’s most disadvantaged communities. 23% 16% 18% 11% 11% 6% 4% 5% 4% 2% 0% 5% 10% 15% 20% 25% 1 2 3 4 5 6 7 8 9 10 SIMD Area 227
Page 228
17. Reaching Clients Across South Lanarkshire An analysis of Money Matters Advice Service (MMAS) clients by electoral ward, compared with the population distribution across South Lanarkshire, provides insight into how effectively the service is reaching local communities. The table below shows the percentage of the total South Lanarkshire population living in each ward alongside the percentage of MMAS clients from that area. This comparison highlights several important findings: • High Engagement in Areas of Need: MMAS serves a notably higher proportion of clients than the population share in Blantyre (8.63% of clients vs. 4.97% of population), Hamilton South (9.39% vs. 6.85%), and Larkhall (8.55% vs. 5.84%). These areas are known to experience higher levels of deprivation, indicating that MMAS is effectively reaching residents in need of financial and welfare advice. • Broad Reach in Cambuslang and East Kilbride: Client representation is relatively aligned with the population in Cambuslang East and West and across most East Kilbride wards. Slight overrepresentation in some of these areas—such as East Kilbride Central South (5.60% clients vs. 4.59% population)— demonstrates balanced outreach across different parts of the region. • Underrepresentation in Affluent or Rural Areas: Wards such as Avondale and Stonehouse (1.84% clients vs. 5.59% population) and Bothwell and Uddingston (1.54% vs. 4.11%) show lower client uptake relative to their population share. These areas typically rank higher in SIMD scores (i.e. less deprived), which may explain the reduced demand for advice services. This distribution confirms that Money Matters is fulfilling its mission of supporting individuals and families in South Lanarkshire who are most in need. 0.00%1.00%2.00%3.00%4.00%5.00%6.00%7.00%8.00%9.00%10.00% Clients by Electoral Ward Population as a % Cients as a % 228
Page 229
Electoral Ward Population as a % Clients as a % Avondale and Stonehouse 5.59% 1.84% Blantyre 4.97% 8.63% Bothwell and Uddingston 4.11% 1.54% Cambuslang East 5.32% 5.39% Cambuslang West 4.70% 5.33% Clydesdale East 3.99% 2.80% Clydesdale North 4.52% 4.82% Clydesdale South 4.62% 5.28% Clydesdale West 6.06% 6.28% East Kilbride Central North 4.84% 5.25% East Kilbride Central South 4.59% 5.60% East Kilbride East 4.66% 5.15% East Kilbride South 5.10% 4.46% East Kilbride West 4.80% 1.97% Hamilton North and East 4.51% 3.77% Hamilton South 6.85% 9.39% Hamilton West and Earnock 5.92% 4.53% Larkhall 5.84% 8.55% Rutherglen Central and North 4.40% 3.69% Rutherglen South 4.61% 5.73% 229
Page 230
18. Customer Satisfaction – Listening to the Voices of Residents At Money Matters Advice Service, we believe our clients are at the heart of everything what we do. That’s why we place strong emphasis on collecting and analysing feedback to continuously improve the support we offer. The latest customer satisfaction survey reflects our ongoing commitment to service excellence. Our service achieved an impressive average customer rating of 4.79 out of 5 stars, a testament to the trust and satisfaction of those we support. A striking 87.10% of respondents gave us a full 5-star rating, indicating a high level of overall contentment with their experience. Accessibility remains a top priority. When asked how easy it was to access the service— considering factors like opening times, location, and contact methods—64.52% described it as “Very Easy,” and only a small fraction (8.06%) found it difficult. This aligns with our aim to make advice available when and where it’s needed most. Timeliness of response is another critical element of effective service delivery. 81.82% of users rated our response times as “Excellent,” while 15.91% said they were “Good.” Only a minimal 2.27% rated it as “Poor,” highlighting room for further enhancement but also a solid performance overall. Communication throughout the process is equally vital. We’re pleased to report that 95.45% of clients felt they were kept up to date with the progress of their case. This ongoing engagement helps clients feel supported and informed every step of the way. Finally, when asked whether they would use the service again or recommend it to others, 93.55% of respondents answered “Yes.” This strong endorsement underscores the value and impact of our work in helping individuals navigate financial challenges. These results validate the dedication of our team and the effectiveness of our service model. We continue to listen, learn, and adapt—ensuring that Money Matters remains a trusted source of guidance and support for all who turn to us. 230
Page 231
0.00% 1.61% 4.84% 6.45% 87.10% 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 100.00% 1 2 3 4 5 How would you rate your experience of using the Money Matters Advice Service (5 stars being best) 64.52% 14.52% 12.90% 8.06% 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% Very Easy Okay Easy Difficult How did you find accessing the Service in terms of opening times, location and method of contacting us? 81.82% 15.91% 2.27% 0.00% 20.00% 40.00% 60.00% 80.00% 100.00% Excellent Good Poor How would you rate the response time before you could get the help your required? 95.45% 4.55% Yes No Were you kept up to date with the progress of your case? 93.55% 6.45% Yes No Would you use the Service again or recommend to a friend or family member? 231
Page 232
19. Case Studies Welfare Rights A client with serious health issues was made redundant and used their redundancy to clear debts, leaving them with no income and worsening stress. A full benefits check revealed entitlement to Universal Credit, Council Tax Reduction, and eligibility for Adult Disability Payment, which was claimed. Immediate emergency support was provided via the Community Wellbeing Team in the form or a Cash First grant and fuel vouchers. The client expressed deep relief and gratitude for the timely help and guidance. Macmillan Referral Case Study A single client in a council tenancy was referred after a cancer diagnosis. Though initially hesitant due to savings and a private pension, a full benefits check identified entitlement to Adult Disability Payment and Universal Credit. Successful claims unlocked further support: Motability, Blue Badge, Care of Gardens, Discretionary Housing Payment, and Council Tax Reduction. The client was extremely pleased with the outcome and support received. Community Wellbeing Team A 60-year-old man transitioning from Employment and Support Allowance to Universal Credit had no income and couldn’t afford food or utilities. He received food and fuel assistance and a Cash First payment, whilst a Welfare Right Officer assisted him with his Universal Credit. This holistic approach meant he could meet his essential needs while he awaited his first Universal Credit payment. Money Advice A client contacted Money Matters after receiving notice that the DWP would recover a historic benefit overpayment through a Direct Earnings Attachment (DEA). The proposed deduction risked 40% of his income—jeopardising essential bills. Referred to Money Matters, a Money Adviser assessed his finances and calculated an affordable repayment. With the adviser’s support, the DWP agreed to reduce the deduction amount. This intervention protected the client’s financial stability and prevented escalating hardship. Energy Advice A Client’s daughter contacted Money Matters to check her father’s eligibility for the £200 Alternative Fuel Payment for oil heating. She was unsure how to apply, so an Energy Adviser provided guidance and the direct UK Government link. Using this support, she successfully submitted the online application. She said, “Only by contacting Money Matters was I able to get this payment for him.” 232
Page 233
20. Appendix: Electoral Ward Update The following outlines client engagement and service delivery for 2024–25 on a ward-by-ward basis. Please note that not all Money Matters Advice Service clients reside in South Lanarkshire (SLC Employees, Kinship carers etc.), so the figures by Electoral Ward may not match the overall totals for the Service. Avondale and Stonehouse Population 18,030 Unique Clients 200 Number of Cases 461 Financial Gain (Claims) £477,918 New Debt Dealt With £143,591 Debt Written Off (Not all new debt) £34,234 Cash First Cases 106 Food Bank Referrals 8 Fuel Bank Referrals 36 Blantyre Population 16,040 Unique Clients 936 Number of Cases 4,115 Financial Gain (Claims) £1,697,207 New Debt Dealt With £867,392 Debt Written Off (Not all new debt) £200,665 Cash First Cases 374 Food Bank Referrals 253 Fuel Bank Referrals 491 Bothwell and Uddingston Population 13,260 Unique Clients 167 Number of Cases 352 Financial Gain (Claims) £393,041 New Debt Dealt With £523,623 Debt Written Off (Not all new debt) £189,651 Cash First Cases 65 Food Bank Referrals 3 Fuel Bank Referrals 18 233
Page 234
Cambuslang East Population 17,180 Unique Clients 585 Number of Cases 1,715 Financial Gain (Claims) £1,249,628 New Debt Dealt With £269,015 Debt Written Off (Not all new debt) £23,292 Cash First Cases 158 Food Bank Referrals 85 Fuel Bank Referrals 171 Cambuslang West Population 15,160 Unique Clients 578 Number of Cases 1,894 Financial Gain (Claims) £1,350,816 New Debt Dealt With £370,414 Debt Written Off (Not all new debt) £65,395 Cash First Cases 177 Food Bank Referrals 99 Fuel Bank Referrals 245 Clydesdale East Population 12,860 Unique Clients 304 Number of Cases 875 Financial Gain (Claims) £779,539 New Debt Dealt With £270,012 Debt Written Off (Not all new debt) £44,521 Cash First Cases 114 Food Bank Referrals 58 Fuel Bank Referrals 78 Clydesdale North Population 14,570 Unique Clients 523 Number of Cases 1,787 Financial Gain (Claims) £790,883 New Debt Dealt With £455,767 Debt Written Off (Not all new debt) £87,947 Cash First Cases 293 Food Bank Referrals 149 Fuel Bank Referrals 217 234
Page 235
Clydesdale South Population 14,900 Unique Clients 573 Number of Cases 1,812 Financial Gain (Claims) £1,358,438 New Debt Dealt With £657,822 Debt Written Off (Not all new debt) £78,777 Cash First Cases 226 Food Bank Referrals 137 Fuel Bank Referrals 198 Clydesdale West Population 19,540 Unique Clients 681 Number of Cases 2,135 Financial Gain (Claims) £1,308,061 New Debt Dealt With £602,274 Debt Written Off (Not all new debt) £131,710 Cash First Cases 260 Food Bank Referrals 166 Fuel Bank Referrals 192 East Kilbride Central North Population 15,620 Unique Clients 569 Number of Cases 1,842 Financial Gain (Claims) £1,294,270 New Debt Dealt With £533,095 Debt Written Off (Not all new debt) £84,656 Cash First Cases 204 Food Bank Referrals 29 Fuel Bank Referrals 169 East Kilbride Central South Population 14,800 Unique Clients 607 Number of Cases 1,867 Financial Gain (Claims) £1,270,695 New Debt Dealt With £432,866 Debt Written Off (Not all new debt) £21,080 Cash First Cases 213 Food Bank Referrals 38 Fuel Bank Referrals 211 235
Page 236
East Kilbride East Population 15,040 Unique Clients 559 Number of Cases 1,696 Financial Gain (Claims) £1,096,901 New Debt Dealt With £518,308 Debt Written Off (Not all new debt) £54,839 Cash First Cases 190 Food Bank Referrals 23 Fuel Bank Referrals 183 East Kilbride South Population 16,440 Unique Clients 484 Number of Cases 1,295 Financial Gain (Claims) £1,329,016 New Debt Dealt With £698,559 Debt Written Off (Not all new debt) £466,871 Cash First Cases 125 Food Bank Referrals 16 Fuel Bank Referrals 94 East Kilbride West Population 15,480 Unique Clients 214 Number of Cases 472 Financial Gain (Claims) £449,334 New Debt Dealt With £301,191 Debt Written Off (Not all new debt) £119,909 Cash First Cases 32 Food Bank Referrals 5 Fuel Bank Referrals 18 Hamilton North and East Population 14,550 Unique Clients 409 Number of Cases 1,172 Financial Gain (Claims) £906,681 New Debt Dealt With £261,326 Debt Written Off (Not all new debt) £39,455 Cash First Cases 359 Food Bank Referrals 76 Fuel Bank Referrals 141 236
Page 237
Hamilton South Population 22,090 Unique Clients 1,018 Number of Cases 4,090 Financial Gain (Claims) £1,789,872 New Debt Dealt With £1,017,537 Debt Written Off (Not all new debt) £150,900 Cash First Cases 531 Food Bank Referrals 319 Fuel Bank Referrals 599 Hamilton West and Earnock Population 19,110 Unique Clients 491 Number of Cases 1,321 Financial Gain (Claims) £1,156,727 New Debt Dealt With £449,591 Debt Written Off (Not all new debt) £132,558 Cash First Cases 442 Food Bank Referrals 47 Fuel Bank Referrals 161 Larkhall Population 18,900 Unique Clients 927 Number of Cases 3,028 Financial Gain (Claims) £2,139,494 New Debt Dealt With £878,706 Debt Written Off (Not all new debt) £86,690 Cash First Cases 343 Food Bank Referrals 190 Fuel Bank Referrals 303 Rutherglen Central and North Population 14,190 Unique Clients 399 Number of Cases 1,175 Financial Gain (Claims) £920,960 New Debt Dealt With £125,747 Debt Written Off (Not all new debt) £1,857 Cash First Cases 202 Food Bank Referrals 71 Fuel Bank Referrals 166 237
Page 238
Rutherglen South Population 14,870 Unique Clients 622 Number of Cases 2,138 Financial Gain (Claims) £1,274,071 New Debt Dealt With £590,584 Debt Written Off (Not all new debt) £40,740 Cash First Cases 220 Food Bank Referrals 126 Fuel Bank Referrals 296 238