Democracy Spraffa

Agenda Document Pack - Finance and Corporate Resources Committee - 11/06/2025

South Lanarkshire Council · 11 June 2025
Back to Finance and Corporate Resources Committee — 11 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 03 June 2025 
Dear Councillor 
Finance and Corporate Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 11 June 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Lesley McDonald (Chair), Walter Brogan (Depute Chair), Celine Handibode (Depute Chair), Joe
Fagan (ex officio), Alex Allison, Mathew Buchanan, Andy Carmichael, Maureen Chalmers, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Mary Donnelly, Grant Ferguson, Gladys Ferguson-Miller,
Graeme Horne, Martin Hose, Ross Lambie, Katy Loudon, Hugh Macdonald, Catherine McClymont,
Elaine McDougall, Mark McGeever, Mo Razzaq, John Ross, Graham Scott, Kirsty Williams 
Substitutes
Archie Buchanan, Poppy Corbett, Colin Dewar, Ross Gowland, Gavin Keatt, Susan Kerr, Martin
Lennon, Richard Lockhart, Richard Nelson, Carol Nugent, Norman Rae, Helen Toner, David
Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Finance and Corporate Resources Committee
held on 26 March 2025 submitted for approval as a correct record.  (Copy
attached) 
5 - 12 
3 Minutes of Appeals Panel
Minutes of the Appeals Panel held on 27 February 2025 submitted for approval
as a correct record.  (Copy attached) 
13 - 14 
4 Minutes of the Recruitment Committee
Minutes of the meeting of the Recruitment Committee held on 23 April 2025
submitted for approval as a correct record.  (Copy attached) 
15 - 16 
Monitoring Item(s) 
5 Finance and Corporate Workforce Monitoring - 1 February to 31 March
2025
Report dated 6 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
17 - 24 
6 Council-wide Workforce Monitoring – 1 February to 31 March 2025
Report dated 6 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
25 - 44 
7 Finance and Corporate Resource Plan - Quarter 4 Progress Report
2024/2025
Report dated 13 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
45 - 62 
Item(s) for Decision 
8 Finance and Corporate Resource Plan 2025/2026
Report dated 13 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
63 - 82 
9 Revenue Collection and Approval for Write-Offs
Report dated 21 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
83 - 88 
10  2025/2026 Information and Communication Technology (ICT) Asset
Management Plan
Report dated 21 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
89 - 110 
11  Gaelic Language Plan 2025 to 2030
Report dated 7 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
111 - 138 
12  Amendment to Local Government Pension Scheme Discretions Policy
Report dated 11 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
139 - 160
2

Page 3

Item(s) for Noting 
13  Review of Procurement Strategy for 2025/2026
Report dated 12 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
161 - 188 
14  Notification of Contracts Awarded: 1 October 2024 to 31 March 2025
Report dated 8 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
189 - 192 
Urgent Business 
15  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

FINANCE AND CORPORATE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 26 March 2025 
Chair:
Councillor Celine Handibode (Depute) 
Councillors Present:
Councillor Alex Allison, Councillor Mathew Buchanan, Councillor Andy Carmichael, Councillor Andrea
Cowan, Councillor Maureen Devlin, Councillor Colin Dewar (substitute for Councillor Maureen
Chalmers), Councillor Mary Donnelly, Councillor Grant Ferguson, Councillor Gladys Ferguson-Miller,
Councillor Graeme Horne, Councillor Martin Hose, Councillor Susan Kerr (substitute for Councillor
Catherine McClymont), Councillor Katy Loudon, Councillor Hugh Macdonald, Councillor Elaine
McDougall, Councillor Mark McGeever, Councillor Mo Razzaq, Councillor John Ross, Councillor
Graham Scott, Councillor Kirsty Williams 
Councillors' Apologies:
Councillor Walter Brogan (Depute), Councillor Maureen Chalmers, Councillor Margaret Cooper,
Councillor Joe Fagan, Councillor Ross Lambie, Councillor Catherine McClymont, Councillor Lesley
McDonald (Chair) 
Finance and Corporate Resources
J Taylor, Executive Director; C Fergusson, Head of Finance (Transactions); M Husband, Head of IT
Services; S Jessup, Administration Assistant; T Little, Head of Communications and Strategy; C Lyon,
Administration Officer; M Milne, Head of Personnel Services; L O’Hagan, Head of Finance (Strategy);
I Strachan, Head of Administration and Legal Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Finance and Corporate Resources Committee held on 29
January 2025 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Minutes of Appeals Panel
The minutes of the meeting of the Appeals Panel held on 22 January 2025 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
4 Revenue Budget Monitoring 2024/2025 - Finance and Corporate Resources 
A report dated 26 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted comparing the actual expenditure for the period 1 April 2024 to 24 January 2025
and providing a forecast for the year to 31 March 2025 for Finance and Corporate Resources.  
2
5

Page 6

A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided at Appendix B to the report. 
As at 24 January 2025, the projected outturn position for the Resource was an underspend of
£0.856 million before approved transfers to reserves. 
Following the Council’s formal probable outturn exercise, the Resource was forecasting a
breakeven position after approved transfers to reserves of £0.856 million. 
Transfers to Reserves approved by the Executive Committee on 12 February 2025, totalled
£0.856 million and related to £0.750 million for Scottish Welfare Funding which would be carried
forward for use in 2025/2026.  There was also an underspend of £0.106 million in Grants to
Voluntary Organisations budget which was being set aside to support the use of reserves to delay
the implementation of the 2024/2025 Budget Saving, as agreed by the Council at its meeting on
26 February 2025.  After those transfers, the Resource outturn was breakeven. 
Virements were proposed to realign budgets, and those movements were detailed in the
appendices to the report. 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position, as detailed in Appendix B of the
report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference:  Minutes of 29 January 2025 (Paragraph 3), Minutes of the Executive Committee of
12 February 2025 (Paragraph 3) and Minutes of South Lanarkshire Council of 26
February 2025 (Paragraph 2)] 
5 Capital Budget Monitoring 2024/2025 - Finance and Corporate Resources 
A report dated 24 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted advising of progress on Finance and Corporate Resources’ capital programme for
2024/2025 and summarising the expenditure position at 24 January 2025. 
The revised capital programme for 2024/2025 was £3.086 million, as approved by the Executive
Committee on 26 June 2024. 
The forecast for the financial year was £2.678 million and spend to date was £2.468 million.  The
forecast underspend reflected the timing of spend across this year and into the new financial year
and resulted in budget required in 2025/2026 rather than 2024/2025.  Funding for projects
remaining underspent at the financial year end would be carried forward to allow the projects to
be completed in 2025/2026. 
The Committee decided: that the Finance and Corporate Resources’ capital
programme of £3.086 million, and expenditure to date of
£2.678 million, be noted. 
[Reference:  Minutes of 29 January 2025 (Paragraph 4)] 
6

Page 7

6 Finance and Corporate Resources - Workforce Monitoring – December 2024 and
January 2025
A report dated 3 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the following employee information for Finance and Corporate Resources for the
period December 2024 and January 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 14 December 2024 
Officers responded to a member’s questions on the report. 
The Committee decided: that the report be noted 
[Reference:  Minutes of 29 January 2025 (Paragraph 5)] 
7 Council-wide Workforce Monitoring – December 2024 and January 2025 
A report dated 7 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the following Council-wide employee information for the period December 2024 and
January 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 14 December 2024 
Officers responded to a member’s question on the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 29 January 2025 (Paragraph 6)] 
8 Revenue Collection and Approval for Write-Offs 
A report dated 3 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 collection performance for the financial year 2024/2025 to 31 January 2025 on revenue
income which comprised Council Tax, non-domestic rates (NDR), sundry debts and arrears
 performance in the Non Domestic Rates Incentivisation Scheme (NDRIS)
 the write-off of irrecoverable Council Tax, non-domestic rates, Business Improvement
District (BID) levy, sundry debt and Housing Rent and associated charges  
7

Page 8

Details were provided on current collection targets.  The Council was ahead of target but behind
comparable performance from 2023/2024 in respect of Council Tax.  In respect of non-domestic
rates and sundry debt, the Council was ahead of both target and comparable performance from
2023/2024. 
In terms of arrears collection targets, the Council was ahead of both target and comparable
performance from 2023/2024 in respect of Council Tax and non-domestic rates.  In respect of
sundry debt, the Council was behind both target and comparable performance from 2023/2024. 
The Non Domestic Rates Incentivisation Scheme (NDRIS), formerly known as the Business Rates
Incentivisation Scheme (BRIS), was a Scottish Government initiative to incentivise growth of the
local business tax base, with a view to increasing NDR income yields. 
The Scottish Government set annual targets for growth (buoyancy) and councils which achieved
their target retained 50% of the additional income generated above the target.  The provisional
annual buoyancy target for South Lanarkshire Council in 2024/2025 had been set by the Scottish
Government at 0.9%. 
Performance against the NDRIS target would be reported to Committee on a quarterly basis. 
Buoyancy to the end of December 2024 was 0.76%.  The tax base required to achieve further
growth of more than 0.14% during the last quarter of the financial year to secure additional income
under the scheme. 
It was proposed that the following debts be written off:- 
 irrecoverable Council Tax accounts from 1993/1994 to 2024/2025 to the value of
£230,831.40 relating primarily to prescribed debt, sequestrations and estates of the
deceased
 irrecoverable non-domestic rates from 2022/2023 to 2024/2025 to the value of £386,014.73
relating primarily to debtors in liquidation, those who had ceased trading or had been
sequestrated
 BID levies totalling £6,000.00 administered by the Council on behalf of Hamilton, Carluke
and Lanark BID companies
 sundry debts to a value of £410,430.23
 former tenant rent arrears totalling £61,720.86 
The Committee decided: 
(1) that the Council’s performance in the collection of revenues be noted; 
(2) that the current position in respect of the Non Domestic Rates Incentivisation Scheme be
noted; and 
(3) that the write-off of the following irrecoverable debts be approved:-
 Council Tax debt from 1993/1994 to 2024/2025 to the value of £230,831.40
 Non Domestic Rates from 2022/2023 to 2024/2025 totalling £386,014.73
 BID levies totalling £6,000.00
 sundry debts to a value of £410,430.23
 house rent and associated charges totalling £61,720.86 
[Reference:  Minutes of 29 January 2025 (Paragraph 9)]  
8

Page 9

9 Consultation on Universal Credit – Mitigation of the Two-Child Limit 
A report dated 4 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the proposed response to the Scottish Government’s consultation on Universal
Credit – Mitigation of the Two-Child Limit. 
Universal Credit was a UK benefit administered by the Department for Work and Pensions and
was available for people across the UK to apply for.  It was the only means tested benefit available
that an individual or family could apply for when they were of working age.  Where an individual
or family was responsible for a child, a Child Element was paid as part of the entitlement to
Universal Credit.  However, the UK Government would only pay the Child Element for the first 2
children where any subsequent children were born after 6 April 2017, except in limited
circumstances. 
The exceptions were where the third or other subsequent child was part of a multiple birth (twins
etc), the child was part of a non-parental caring agreement or born because of non-consensual
conception. 
On 4 December 2024, the Scottish Government set out plans to mitigate the two-child cap in
Scotland as part of the annual budget statement to the Scottish Parliament.  The proposal was for
a payment equal to the Universal Credit Child Element for each third and subsequent child
impacted by the two-child cap. 
The deadline for responses to the consultation was 18 April 2025 and the Council’s proposed
response was detailed in Appendix 1 to the report. 
In response to a member’s request for data specific to South Lanarkshire, the Head of Finance
(Transactions) gave an undertaking to check if available and, if so, provide to the member
concerned. 
The Committee decided: that the Council’s response, as detailed in Appendix 1 to the
report, be approved for submission to the Scottish
Government. 
10 Finance and Public Administration Committee – Call for Views on the Scottish
Budget Process in Practice
A report dated 4 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the proposed response to the Scottish Parliament Finance and Public Administration
Committee’s call for views on the Scottish Budget Process in Practice. 
The Finance and Public Administration Committee was carrying out a short, focused inquiry on
how the Scottish budget process had worked in practice, during the current parliamentary session,
2021 to 2026.  It aimed to identify any improvements that could be made to the budget process,
ahead of the next 5 year session of Parliament. 
The focus of the inquiry would be on the following 4 core objectives that underpinned the Scottish
budget process:- 
 to have greater influence on the formulation of the Scottish Government’s budget proposals
 to improve transparency and raise public understanding and awareness of the budget
 to respond effectively to new fiscal and wider policy challenges
 to lead better outputs and outcomes as measured against benchmarks and stated objectives  
9

Page 10

A call for views was issued on 12 February 2025, requesting particular feedback on a number of
areas by 26 March 2025.  The specific questions and the Council’s proposed response was
summarised in Section 4 of the report and the full response, which would be submitted prior to
the deadline, was attached as Appendix 1 to the report. 
Officers responded to a member’s question and, following discussion, it was agreed that the
response should be submitted highlighting that, at this point in time, this was the Council’s position. 
The Council decided: that the Council’s response, as detailed in Appendix 1 to the
report, subject to the inclusion of a reference that, at this
point in time, this was the Council’s position, be approved
for submission to the Scottish Government. 
11 Consultation on Financial Considerations that Women Face When Leaving an
Abusive Relationship
A report dated 3 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted to the Social Justice and Social Security Committee of the Scottish Parliament
consultation on the financial considerations that women faced when leaving an abusive
relationship. 
The consultation was launched on 13 December 2024 and closed on 20 February 2025. 
The Social Justice and Social Security Committee wanted to learn more about:- 
 the support local authorities gave to women leaving abusive relationships
 how rules and practices related to the public sector and social security took account of the
financial issues women could face when leaving abusive relationships
 how much information and advice was available from public bodies and charities 
The Council’s response was summarised in Section 4 of the report and the full response, which
had been submitted prior to the deadline, was attached as Appendix 1 to the report. 
The Committee decided: that the Council’s response to the Social Justice and Social
Security Committee consultation on the financial
considerations that women faced when leaving an abusive
relationship, as detailed in Appendix 1 to the report, be
noted. 
12 Mental Health Moratorium Regulations - Consultation 
A report dated 3 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the Scottish Government consultation on the Mental Health Moratorium Regulations. 
The Bankruptcy and Diligence (Scotland) Act 2024 was passed by the Scottish Parliament on 6
June 2024 and received Royal Assent on 15 July 2024.  It introduced a framework that allowed
Scottish Ministers to make regulations that created a Mental Health Moratorium.  This would allow
those who were receiving compulsory mental health treatment, or the equivalent, to apply for a
Moratorium that would provide them with protection from their creditors while their treatment
continued.  
10

Page 11

Section 2 of the 2024 Act required Scottish Ministers, prior to laying Regulations before the
Scottish Parliament, to lay a proposed draft copy of the Regulations before the Parliament for 60
days.  The Scottish Government also committed, during the passing of the Bill, to consult with
stakeholders on any draft Regulations.  The consultation was launched on 9 December 2024 and
closed on 17 March 2025. 
The proposed Mental Health Moratorium was intended to provide protections for those who were
receiving compulsory mental health treatment in an institution or the community from those they
owed debt to.  It was proposed that the Moratorium would be administered by the Scottish
Government agency, the Accountant in Bankruptcy. 
The Council’s response was summarised in Section 4 of the report and the full response, which
had been submitted prior to the deadline, was attached as Appendix 1 to the report. 
The Committee decided: that the Council’s response to the Scottish Government
consultation on the Mental Health Moratorium Regulations,
as detailed in Appendix 1 to the report, be noted. 
13 Response to Consultation on the Public Sector Equality Duty
A report dated 20 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on the Scottish Parliament Equalities, Human Rights and Civil Justice Committee
consultation on the Public Sector Equality Duty. 
The Public Sector Equality Duty (PSED) was a legal requirement for public authorities in Scotland. 
Under the duty, public authorities must consider equality when carrying out their functions.  The
aims of the duty were to:- 
 eliminate unlawful behaviour by ending discrimination, harassment, and victimisation
 advance equality of opportunity between people who had protected characteristic and those
who did not
 foster good relations between people who had a protected characteristic and those who did
not 
The consultation opened on 7 February and closed on 28 February 2025.  The consultation
advised that The Equalities, Human Rights and Civil Justice Committee was expected to work on
this inquiry for 3 weeks from 4 March 2025, and would use the responses from the 5 questions in
the consultation to form the basis of questions at the evidence sessions.  The Council’s response
to each question was detailed in paragraph 4.1 of the report. 
Following consultation, should the Scottish Government proceed and implement the proposals,
the Council would be required to:- 
 review and update or introduce guidance/training for employees and managers on inclusive
communications.  A joint working approach with the Personnel, Legal and Communications
team would be required as well as Resource Management Teams involvement to ensure
the full Council needs were met
 incorporate the Duty into the integrated impact assessment process 
The Committee decided: 
(1) that content of the report be noted; and 
(2) that the requirements on the Council should this duty be implemented, as detailed in Section
4.3 of the report, be noted.  
11

Page 12

14 Urgent Business 
There were no items of urgent business. 
12

Page 13

APPEALS PANEL 
Minutes of meeting held in Committee Room 5, Council Offices, Almada Street, Hamilton on 27
February 2025 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Kenny McCreary, Councillor Catherine McClymont 
Attending:
Finance and Corporate Resources
G Robertson, Personnel Adviser; L Hamilton, Administration Officer 
1 Declaration of Interests
No interests were declared. 
2 Urgent Business
There were no items of urgent business. 
3 Exclusion of Press and Public
The Panel decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the next item of business on the grounds that
it was likely that there would be disclosure of exempt
information in terms of Paragraph 1 of Part I of Schedule 7A
of the Act. 
4 Appeal Against Demotion
The Panel considered an appeal (Ref 1/25) by an employee against their dismissal. 
The appellant was present and represented by a trade union representative.  The Council was
represented by a Personnel Adviser. The Council called a witness and the appellant’s
representative called the appellant.  All parties were heard in relation to the appeal and then
withdrew from the meeting. 
The Panel decided: that the grounds of the appeal had been substantiated in
part and the appeal be upheld to the extent that the
summary dismissal be replaced by a contractual dismissal. 
3
13

Page 14

14

Page 15

RECRUITMENT COMMITTEE 
Minutes of meeting held in Committee Room 2, Council Offices, Almada Street, Hamilton on 23 April
2025 
Chair:
Councillor Joe Fagan 
Councillors Present:
Councillor Alex Allison, Councillor Robert Brown, Councillor Gerry Convery (Depute), Councillor
Katy Loudon (substitute for Councillor Maureen Chalmers), Councillor John Ross 
Councillor’s Apology:
Councillor Maureen Chalmers 
Attending:
Chief Executive’s Service
P Manning, Chief Executive
Finance and Corporate Resources
C Lyon and S McLeod, Administration Officers; M Milne, Head of Personnel Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Recruitment Committee held on 13 March 2025 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Urgent Business 
There were no items of urgent business. 
4 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the next item of business on the grounds
that it was likely that there would be disclosure of exempt
information in terms of Paragraph 1 of Part I of Schedule
7A of the Act. 
5 Post of Executive Director (Education Resources) 
The Committee proceeded to interview 6 candidates for the post of Executive Director
(Education Resources). 
4
15

Page 16

The Committee decided: that L McRoberts, Director of Education/Depute Chief
Executive, South Ayrshire Council be appointed to the post
of Executive Director (Education Resources. 
[Reference: Minutes of 13 March 2025 (Paragraph 4)] 
16

Page 17

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources – Workforce
Monitoring – 1 February to 31 March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for 1 February to 31 March 2025 relating to
Finance and Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the following employment information for 1 February to 31 March 2025
relating to Finance and Corporate Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing watch as at 8 March 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Finance and
Corporate Resources provides information on the position for 1 February to
31 March 2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of March 2025 for
Finance and Corporate Resources. 
The Resource absence figure for March 2025 was 3.7%, this figure has increased by
0.2% when compared to the previous month and is 3.1% lower than the Council-
wide figure.  Compared to March 2024, the Resource absence figure has increased
by 1.1%. 
Based on the absence figures at March 2025 and annual trends, the annual average
absence for the Resource for 2024/2025 is 3.5%, compared to a Council-wide
average figure of 5.9%.
5
17

Page 18

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health overall, 51 referrals were made this
period.  This represents an increase of 10 when compared with the same period last
year. 
4.3. Accident/Incident Statistics
There were no accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, no disciplinary hearings or appeals were heard by the resource
and no appeals were pending.  These figures are unchanged when compared with
the same period last year.  Also, no grievance or Dignity at Work complaints were
raised within the Resource, these figures also remain unchanged.   
4.5. Analysis of Leavers (Appendix 2a) 
There were no leavers this period who were eligible for an exit interview.  This figure
has decreased by 6, when compared with the same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been a decrease of 8 employees in post from 14 December 2024 to 8
March 2025. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.
18

Page 19

10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources – 26 March 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Eileen McPake, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Eileen.McPake@southlanarkshire.gov.uk 
19

Page 20

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 3.2 October 0.0 0.0 0.0 October 3.8 3.2 3.2 October 5.8 5.1 6.0
November 3.4 3.5 4.6 November 0.0 0.0 0.0 November 3.4 3.5 4.6 November 6.5 6.2 6.9
December 4.3 3.3 4.4 December 0.0 0.0 0.0 December 4.3 3.3 4.4 December 7.0 6.6 7.0
January 4.3 2.8 3.7 January 0.0 0.0 0.0 January 4.3 2.8 3.7 January 5.8 6.1 6.7
February 3.8 3.5 3.5 February 0.0 0.0 0.0 February 3.8 3.5 3.5 February 5.9 6.4 7.0
March 3.8 2.6 3.7 March 0.0 0.0 0.0 March 3.8 2.6 3.7 March 6.4 6.3 6.8
Annual Average 3.8 3.5 3.5 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.5 Annual Average 5.7 5.4 5.9
Average Apr-Mar 3.8 3.5 3.5 Average Apr-Mar 0.0 0.0 0.0 Average Apr-Mar 3.8 3.5 3.5 Average Apr-Mar 5.7 5.4 5.9
814 0 814 15626
Manual Workers
No of Employees at 31 March 2025
Resource Total
No of Employees at 31 March 2025
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 31 March 2025 No of Employees at 31 March 2025
APT&C Council Wide
20

Page 21

Feb - Mar Feb - Mar
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 16 21
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 41 51
Feb - Mar Feb - Mar
2024 2025
Minor 2 0
Violent Incident:  Physical**** 1 0
Total Accidents/Incidents 3 0
Feb - Mar Feb - Mar
2024 2025
Total Number of Hearings 0 0
Feb - Mar Feb - Mar
2024 2025
Number of Grievances 0 0
Feb - Mar Feb - Mar
2024 2025
Number of Incidents 0 0
RECORD OF DIGNITY AT WORK
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
FINANCE AND CORPORATE  RESOURCES
7 8
0 3
18 19
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
21

Page 22

Feb - Mar Feb - Mar
2024 2025
Career Advancement 1 0
Child Caring / Caring Responsibilities 1 0
Moving outwith area 1 0
Personal Reasons 1 0
Poor relationship with managers / colleagues 1 0
Other 1 0
Total Number of Leavers Eligible for Exit Interview 6 0
Number of Exit Interviews conducted 5 0
Percentage of interviews conducted 83% 0%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
FINANCE AND CORPORATE  RESOURCES
22

Page 23

As at 8 March 2025
Total Number of Employees
F/T P/T F/T P/T
184 22 360 247
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
8.00 89.59 338.44 207.13 56.22 22.00 0.00 0.00 0.00 721.38
As at 14 December 2024
Total Number of Employees
F/T P/T F/T P/T
183 24 365 249
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
8.00 92.08 340.45 210.38 55.05 22.00 0.00 0.00 0.00 727.96
Appendix 3
JOINT STAFFING WATCH RETURN
FINANCE AND CORPORATE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
813
MALE FEMALE TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
821
23

Page 24

24

Page 25

Report 
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council-wide Workforce Monitoring – 1 February to 31
March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period 1 February
to 31 March 2025
[1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for the period 1 February to 31
March 2025 relating to the Council be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 8 March 2025
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Committee.  This report for the Council
provides information on the position for the period 1 February to 31 March 2025. 
4. Attendance Statistics
4.1. Information on absence statistics for the Council and each Resource, as analysed for
March 2025, is provided in Appendices 1 to 8.  Points to note are:- 
The Council’s absence rate for March 2025, shown in Appendix 1, is 6.8%, which
represents an decrease of 0.2% when compared with last month and the figure has
increased by 0.5% when compared to March 2024. 
When compared to March 2024, the APT&C absence rate has increased by 0.7%,
the teachers’ figure has increased by 0.4% and the manual workers’ figure has
increased by 0.3%. 
6
25

Page 26

Based on annual trends and the absence rate to March 2025, the average absence
rate for the Council for the financial year 2024/2025 is 5.9%, compared to 5.38% for
2023/2024. 
In comparison to March 2024 (Appendix 8):- 
 Psychological and musculoskeletal conditions are the main reasons for absence
 Total days lost due to psychological conditions have increased by 523 days
 Total days lost due to musculoskeletal conditions have increased by 513 days 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
5. Occupational Health
5.1. Information on Occupational Health for the period 1 February to 31 March 2025 is
provided in Appendix 9. 
 during the period there were 327 employees referred for a medical examination,
a decrease of 15 when compared to the same period last year.  Both
musculoskeletal and psychological conditions continue to be the main reason for
medical referrals
 a total of 323 employees attended physiotherapy treatment, showing a decrease
of 66 when compared to the same period last year.  Of the 323 employees
referred, 73% remained at work whilst undertaking treatment
 during this period 389 employees were referred to the Employee Support Officer,
showing an increase of 12 when compared with the same period last year.  Of
the referrals made this period, 87% related to personal reasons
 204 employees were referred to the PAM Assist counselling service this period,
showing an increase of 23 when compared with the same period last year.  All
the referrals made this period were made directly by employees.  Work related
referrals accounted for 51% and 49% were for personal/other reasons
 52 employees were referred for Cognitive Behavioural Therapy this period, an
increase of 46 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident reported for 1 February to 31 March 2025 is contained in
Appendix 10. 
 the total number of accidents/incidents recorded was 291, 151 of these have
been investigated and categorised and 140 are still in the process of being
investigated
 of those investigated, no specified injuries were recorded
 of those investigated there were 145 minor accidents/incidents
 of those investigated, 1 accident resulted in an absence lasting over 3 days
 of those investigated, 5 accidents resulted in an absence lasting over 7 days 
7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals
7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation
Referrals for 1 February to 31 March 2025 is contained in Appendices 11, 12a and
12b.
26

Page 27

 in total, 32 disciplinary hearings were held and concluded across Resources
within the Council, this figure has increased by 3 when compared to the same
period last year.
 action was taken in 30 of these cases and 2 appeals were raised against the
outcomes, of which both were not upheld.
 our target is to convene disciplinary hearings within 6 weeks, 78% of hearings
met this target.
 during the period, 1 appeal was heard by the Appeals Panel, of which was not
upheld.
 at the end of March, no Appeals Panel were pending.
 during the period, 4 grievance and 7 Dignity at Work complaints were raised.
 during the period, 1 referral was submitted that was suitable for mediation. 
8. Analysis of Leavers and Exit Interviews
8.1. Information on the number of leavers and exit interviews for the period 1 February to
31 March 2025 is contained in Appendix 13.  Exit interviews are conducted with
employees who leave voluntarily. 
Labour Turnover 
Using information compiled from Resources and Staffing Watch information as at 8
March 2025, the Council’s turnover figure for 1 February to 31 March 2025 is as
follows:- 
60 leavers eligible for exit interviews/15,716 employees in post = Labour Turnover of
0.4%. 
Based on the figure at March 2025, the annual labour turnover figure for the financial
year 2024/2025 for the Council is 3.9%. 
8.2. Analysis of Leavers and Exit Interviews:- 
 there were a total of 60 employees leaving the Council that were eligible for an
exit interview, a decrease of 45 when compared with the same period last year.
 there were a total of 13 exit interviews conducted which is a decrease of 20 when
compared with same period last year. 
9. Recruitment Monitoring
9.1. Information on Recruitment Monitoring for 1 February to 31 March 2025 is contained
within Appendix 14. 
From an analysis of Equal Opportunities Monitoring Forms, the main points to note
are:- 
 2,436 applications and 2,434 completed Equal Opportunities Monitoring Forms
were received
 of those applicants who declared themselves as disabled (156), 83 were
shortleeted for interview and 7 were appointed
 of those applicants of a black/ethnic minority background (316), 81 were
shortleeted for interview and 6 were appointed
 of those applicants who are veterans (10), 1 was shortleeted for interview and no
one was appointed
27

Page 28

10. Staffing Watch
10.1 There has been an decrease of 97 in the number of employees in post from 14
December 2024 to 8 March 2025.  Details of the staffing watch are contained in
Appendix 15. 
11. Employee Implications
11.1. There are no implications for employees arising from the information presented in
this report. 
12. Financial Implications
12.1. All financial implications are accommodated within existing budgets. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no climate change, sustainability or environmental implications arising
from the information presented in this report. 
14. Other Implications
14.1. There are no implications for risk in terms of the information contained within this
report. 
15. Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
15.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources Committee – 26 March 2025 
List of Background Papers
 Monitoring information provided by Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
28

Page 29

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.2 5.2 5.2 April 2.7 2.8 2.9 April 8.8 7.0 7.3 April 5.6 5.1 5.2
May 5.0 5.1 5.4 May 3.6 3.2 3.0 May 7.6 6.2 7.1 May 5.4 5.1 5.3
June 5.0 4.9 5.3 June 2.6 2.2 2.8 June 8.1 6.5 7.2 June 5.3 4.7 5.2
July 4.5 4.0 4.3 July 1.4 1.1 1.0 July 7.4 5.8 6.3 July 4.6 3.8 4.1
August 4.3 4.2 4.6 August 1.4 1.3 1.9 August 7.4 6.2 7.5 August 4.4 4.1 4.7
September 5.2 5.2 6.2 September 2.8 2.9 3.5 September 8.0 7.6 8.3 September 5.4 5.3 6.1
October 5.7 5.2 6.3 October 3.4 2.7 3.8 October 8.1 7.1 7.7 October 5.8 5.1 6.0
November 6.3 6.1 7.0 November 4.7 4.3 5.0 November 8.6 8.1 8.4 November 6.5 6.2 6.9
December 6.7 6.7 7.1 December 5.3 4.8 5.4 December 8.9 7.8 8.5 December 7.0 6.6 7.0
January 5.2 5.8 6.8 January 4.3 4.8 4.9 January 8.0 7.8 8.3 January 5.8 6.1 6.7
February 5.7 6.3 7.0 February 4.1 4.9 4.9 February 7.9 8.0 9.0 February 5.9 6.4 7.0
March 6.2 6.3 7.0 March 4.6 4.1 4.5 March 8.3 8.1 8.4 March 6.4 6.3 6.8
Annual Average 5.4 5.4 6.0 Annual Average 3.4 3.3 3.6 Annual Average 8.1 7.2 7.8 Annual Average 5.7 5.4 5.9
Average Apr-Mar 5.4 5.4 6.0 Average Apr-Mar 3.4 3.3 3.6 Average Apr-Mar 8.1 7.2 7.8 Average Apr-Mar 5.7 5.4 5.9
7226 4014 4386 15626
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Council Wide
APT&C Teachers
No of Employees at 31 March 2025 No of Employees at 31 March 2025
Manual Workers Council Wide
No of Employees at 31 March 2025 No of Employees at 31 March 2025
29

Page 30

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 4.4 3.6 3.2 April 7.3 6.3 6.8 April 6.9 6.0 6.3 April 5.6 5.1 5.2
May 3.9 3.7 3.1 May 6.8 6.3 6.3 May 6.3 5.9 5.9 May 5.4 5.1 5.3
June 3.5 4.3 4.1 June 7.2 5.9 6.4 June 6.7 5.7 6.0 June 5.3 4.7 5.2
July 3.9 2.3 3.8 July 5.9 4.6 4.5 July 5.6 4.3 4.4 July 4.6 3.8 4.1
August 3.4 3.0 3.4 August 6.6 5.2 6.2 August 6.1 4.9 5.7 August 4.4 4.1 4.7
September 3.1 2.5 3.8 September 7.9 7.1 7.5 September 7.1 6.4 6.9 September 5.4 5.3 6.1
October 5.1 2.0 4.2 October 7.5 7.0 7.2 October 7.1 6.3 6.7 October 5.8 5.1 6.0
November 4.2 2.6 3.6 November 8.3 8.1 8.3 November 7.7 7.3 7.6 November 6.5 6.2 6.9
December 3.7 3.0 3.8 December 8.8 7.5 8.1 December 8.0 6.8 7.4 December 7.0 6.6 7.0
January 2.6 3.6 3.9 January 7.4 7.4 7.8 January 6.7 6.9 7.2 January 5.8 6.1 6.7
February 3.6 4.0 4.0 February 7.4 7.8 8.7 February 6.9 7.2 7.9 February 5.9 6.4 7.0
March 3.9 3.2 3.5 March 7.9 7.9 8.2 March 7.3 7.2 7.4 March 6.4 6.3 6.8
Annual Average 3.8 3.2 3.7 Annual Average 7.4 6.8 7.2 Annual Average 6.9 6.2 6.6 Annual Average 5.7 5.4 5.9
Average Apr-Mar 3.8 3.2 3.7 Average Apr-Mar 7.4 6.8 7.2 Average Apr-Mar 6.9 6.2 6.6 Average Apr-Mar 5.7 5.4 5.9
585 2818 3403 15626
Appendix 2
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025
30

Page 31

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.0 5.4 April 2.7 2.8 2.9 April 4.0 3.8 4.0 April 5.6 5.1 5.2
May 5.5 5.4 6.0 May 3.6 3.2 3.0 May 4.5 4.2 4.4 May 5.4 5.1 5.3
June 5.1 4.8 5.5 June 2.6 2.2 2.8 June 3.7 3.4 4.1 June 5.3 4.7 5.2
July 3.8 3.4 3.2 July 1.4 1.1 1.0 July 2.5 2.2 2.0 July 4.6 3.8 4.1
August 3.6 4.0 3.9 August 1.4 1.3 1.9 August 2.4 2.5 2.8 August 4.4 4.1 4.7
September 5.8 5.9 6.6 September 2.8 2.9 3.5 September 4.1 4.3 4.9 September 5.4 5.3 6.1
October 6.5 5.5 6.5 October 3.4 2.7 3.8 October 4.8 4.0 5.0 October 5.8 5.1 6.0
November 7.9 7.1 7.8 November 4.7 4.3 5.0 November 6.2 5.6 6.2 November 6.5 6.2 6.9
December 8.5 8.1 8.6 December 5.3 4.8 5.4 December 6.8 6.3 6.8 December 7.0 6.6 7.0
January 6.1 6.6 8.0 January 4.3 4.8 4.9 January 5.1 5.6 6.3 January 5.8 6.1 6.7
February 6.8 7.2 8.4 February 4.1 4.9 4.9 February 5.4 6.0 6.5 February 5.9 6.4 7.0
March 7.0 7.5 8.3 March 4.6 4.1 4.5 March 5.7 5.7 6.2 March 6.4 6.3 6.8
Annual Average 6.0 5.9 6.5 Annual Average 3.4 3.3 3.6 Annual Average 4.6 4.5 4.9 Annual Average 5.7 5.4 5.9
Average Apr-Mar 6.0 5.9 6.5 Average Apr-Mar 3.4 3.3 3.6 Average Apr-Mar 4.6 4.5 4.9 Average Apr-Mar 5.7 5.4 5.9
3202 4014 7216 15626No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025
Appendix 3
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Education Resources
Council WideAPT&C Teachers Resource Total
31

Page 32

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 3.2 October 0.0 0.0 0.0 October 3.8 3.2 3.2 October 5.8 5.1 6.0
November 3.4 3.5 4.6 November 0.0 0.0 0.0 November 3.4 3.5 4.6 November 6.5 6.2 6.9
December 4.3 3.3 4.4 December 0.0 0.0 0.0 December 4.3 3.3 4.4 December 7.0 6.6 7.0
January 4.3 2.8 3.7 January 0.0 0.0 0.0 January 4.3 2.8 3.7 January 5.8 6.1 6.7
February 3.8 3.5 3.5 February 0.0 0.0 0.0 February 3.8 3.5 3.5 February 5.9 6.4 7.0
March 3.8 2.6 3.7 March 0.0 0.0 0.0 March 3.8 2.6 3.7 March 6.4 6.3 6.8
Annual Average 3.8 3.5 3.5 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.5 Annual Average 5.7 5.4 5.9
Average Apr-Mar 3.8 3.5 3.5 Average Apr-Mar 0.0 0.0 0.0 Average Apr-Mar 3.8 3.5 3.5 Average Apr-Mar 5.7 5.4 5.9
814 0 814 15626
Manual Workers
No of Employees at 31 March 2025
Resource Total
No of Employees at 31 March 2025
Appendix 4
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 31 March 2025 No of Employees at 31 March 2025
APT&C Council Wide
32

Page 33

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.7 5.3 April 10.6 6.9 7.2 April 7.6 6.2 6.1 April 5.6 5.1 5.2
May 4.5 4.9 5.2 May 8.1 6.1 8.1 May 6.0 5.4 6.4 May 5.4 5.1 5.3
June 4.9 5.4 5.7 June 8.5 6.8 8.4 June 6.4 6.0 6.8 June 5.3 4.7 5.2
July 5.5 5.0 5.3 July 8.9 8.1 8.6 July 6.9 6.2 6.7 July 4.6 3.8 4.1
August 4.7 5.1 5.5 August 7.1 8.5 8.8 August 5.7 6.4 6.9 August 4.4 4.1 4.7
September 4.5 4.7 7.5 September 6.3 7.8 7.4 September 5.2 6.0 7.5 September 5.4 5.3 6.1
October 4.3 4.9 7.3 October 7.8 5.2 6.0 October 5.8 5.0 6.8 October 5.8 5.1 6.0
November 4.6 4.8 6.8 November 7.8 6.7 6.2 November 5.9 5.6 6.5 November 6.5 6.2 6.9
December 4.4 5.1 6.4 December 7.2 7.4 5.8 December 5.6 6.0 6.2 December 7.0 6.6 7.0
January 4.5 4.4 7.0 January 5.5 6.0 6.2 January 4.9 5.0 6.7 January 5.8 6.1 6.7
February 4.4 5.2 7.0 February 6.2 6.3 7.1 February 5.1 5.6 7.0 February 5.9 6.4 7.0
March 5.3 5.3 6.8 March 6.8 7.2 5.9 March 5.9 6.1 6.4 March 6.4 6.3 6.8
Annual Average 4.8 5.0 6.3 Annual Average 7.6 6.9 7.1 Annual Average 5.9 5.8 6.7 Annual Average 5.7 5.4 5.9
Average Apr-Mar 4.8 5.0 6.3 Average Apr-Mar 7.6 6.9 7.1 Average Apr-Mar 5.9 5.8 6.7 Average Apr-Mar 5.7 5.4 5.9
857 543 1400 15626No of Employees at 31 March 2025No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
APT&C Manual Workers Council Wide
33

Page 34

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 6.2 6.5 6.5 April 12.6 9.4 8.8 April 8.3 7.4 7.3 April 5.6 5.1 5.2
May 5.7 5.8 5.8 May 10.1 8.4 9.5 May 7.1 6.6 7.0 May 5.4 5.1 5.3
June 5.9 5.5 6.0 June 11.3 8.6 9.2 June 7.6 6.5 7.0 June 5.3 4.7 5.2
July 6.0 5.4 6.5 July 11.8 8.8 11.2 July 7.9 6.5 8.0 July 4.6 3.8 4.1
August 6.0 4.8 6.9 August 10.8 8.6 11.4 August 7.5 6.0 8.4 August 4.4 4.1 4.7
September 5.9 5.6 7.2 September 9.6 9.3 12.0 September 7.1 6.8 8.8 September 5.4 5.3 6.1
October 5.8 6.5 7.5 October 10.4 8.5 11.0 October 7.3 7.1 8.6 October 5.8 5.1 6.0
November 6.0 7.3 8.1 November 10.4 9.0 10.0 November 7.4 7.8 8.7 November 6.5 6.2 6.9
December 6.4 7.4 7.0 December 10.6 9.5 11.6 December 7.7 8.1 8.5 December 7.0 6.6 7.0
January 5.2 7.0 6.7 January 12.0 10.3 11.3 January 7.4 8.1 8.2 January 5.8 6.1 6.7
February 5.8 7.0 7.0 February 11.0 9.9 11.6 February 7.5 7.9 8.5 February 5.9 6.4 7.0
March 7.0 7.1 7.5 March 10.9 9.4 10.7 March 8.2 7.9 8.6 March 6.4 6.3 6.8
Annual Average 6.0 6.3 6.9 Annual Average 11.0 9.1 10.7 Annual Average 7.6 7.2 8.1 Annual Average 5.7 5.4 5.9
Average Apr-Mar 6.0 6.3 6.9 Average Apr-Mar 11.0 9.1 10.7 Average Apr-Mar 7.6 7.2 8.1 Average Apr-Mar 5.7 5.4 5.9
1768 1025 2793 15626No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025
Appendix 6
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Social Work Resources
APT&C Council WideResource TotalManual Workers
34

Page 35

Appendix 7
Absence by long and short term
From: 1 January 2025 to 31 March 2025
Community and Enterprise 3403 2.7 4.5 7.2 2.8 5.1 7.9 2.0 5.5 7.4
Education 7216 2.6 3.7 6.3 2.3 4.2 6.5 2.0 4.2 6.2
Finance and Corporate 814 1.5 2.2 3.7 1.7 1.8 3.5 1.3 2.4 3.7
Housing & Technical 1400 3.2 3.5 6.7 2.5 4.5 7.0 2.0 4.4 6.4
Social Work 2793 2.8 5.5 8.2 3.0 5.5 8.5 2.8 5.8 8.6
Council Overall for January to
March 2025 15626 2.6 4.1 6.7 2.5 4.5 7.0 2.1 4.7 6.8
Resource No of
employees
Resource
Total
Absence %
January 2025
Total Short
Term %
Total Long
Term %
February 2025
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
March 2025
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
35

Page 36

From : 1 March 2025 - 31 March 2025
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1471 29 1100 13 54 10 451 27 887 22 3963 20
Psychological 1691 34 3542 43 246 46 553 33 1448 36 7480 38
Stomach, Bowel, Blood, Metabolic Disorders 598 12 907 11 31 6 174 10 432 11 2142 11
Respiratory 465 9 974 12 60 11 180 11 554 14 2233 11
Other Classification 777 16 1703 21 147 27 300 18 727 18 3654 19
Total Days Lost By Resource 5002 100 8226 100 538 100 1658 100 4048 100 19472 100
Total Work Days Available
From : 1 March 2024 - 31 March 2024
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1278 26 1046 12 66 15 364 21 696 17 3450 18
Psychological 1374 28 3213 38 168 39 642 37 1560 39 6957 35
Stomach, Bowel, Blood, Metabolic Disorders 594 12 969 11 31 7 168 10 437 11 2199 11
Respiratory 578 12 1388 16 68 16 219 13 529 13 2782 14
Other Classification 1065 22 1923 23 99 23 329 19 816 20 4232 22
Total Days Lost By Resource 4889 100 8539 100 432 100 1722 100 4038 100 19620 100
Total Work Days Available
*WDL = Work Days Lost
Finance and
Corporate
25767 47027
Appendix 8
Attendance Monitoring
Absence Classification
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total WDL
By Reason Percentage
Housing and
Technical
Resources
Education
Resources
PercentageTotal WDL
By ReasonREASONS
Community and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Housing and
Technical
Resources
67309 133560 14567
Social Work
Resources
51296282391659414894867903
36

Page 37

Appendix 9
Teachers Others
74 38 60 8 60 87
95 47 55 7 43 95
Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025
90 52 83 79 0 0
51 45 161 178 2 21
84 76 16 21 0 0
18 19 32 23 0 0
52 47 85 88 Social Work 1 2
94 84 377 389 Not Disclosed 3 29
389 323 Total 6 52
Reason Feb - Mar 2024 Feb - Mar 2025
Work Stress 33 105
Addicition 0 0
Personal 103 45
Anxiety/Depression 14 37
Bereavement 31 17
Total 181 204
Finance and Corporate
Education
Community and Enterprise
Resource
Housing and Technical
Occupational Health Reports
From: 1 February 2025 - 31 March 2025 comparison with 1 February 2024 - 31 March 2024
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
Total (Feb - Mar 2025) 327
Total (Feb - Mar 2024) 342
No of Employees Referred For Physiotherapy No of Employees Referred To Employee Support Officer No of Employees Referred For Cognitive Behavioural Therapy
Resource Resource
Community and Enterprise Community and Enterprise
Education (Teachers) Education
Education (Others) Finance and Corporate
Analysis of Counselling Referrals by Cause
Total
Finance and Corporate Housing and Technical
Housing and Technical Social Work
Social Work Total
37

Page 38

Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025 Feb - Mar 2024 Feb - Mar 2025
Specified Injury 0 0 1 0 0 0 0 0 0 0 1 0
Specified Injury (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Specified Injury* 0 0 1 0 0 0 0 0 0 0 1 0
Over 7 Day 4 2 2 0 0 0 1 2 0 0 7 4
Over 7 Day (Violence) 0 0 2 1 0 0 0 0 0 0 2 1
Total Over 7 Day** 4 2 4 1 0 0 1 2 0 0 9 5
Over 3 Day 0 0 2 1 0 0 0 0 0 0 2 1
Over 3 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3 Day** 0 0 2 1 0 0 0 0 0 0 2 1
Minor Injury 18 6 42 17 2 0 1 4 12 11 75 38
Near Miss 4 0 4 1 0 0 0 0 1 0 9 1
Violence (Physical) 10 6 347 77 1 0 0 0 16 1 374 84
Violence (Verbal) 2 5 47 8 0 0 0 2 8 7 57 22
Total Minor*** 34 17 440 103 3 0 1 6 37 19 515 145
Total Finalised 38 19 447 105 3 0 2 8 37 19 527 151
Accident 0 1 18 34 0 0 0 2 0 3 18 40
Incident 0 3 19 11 0 0 0 0 0 0 19 14
Violence (Physical) 0 1 86 69 0 1 0 0 0 0 86 71
Violence (Verbal) 0 2 11 10 0 0 0 0 0 1 11 13
Near Miss 0 0 4 2 0 0 0 0 0 0 3 2
Total to be investigated**** 0 7 138 126 0 1 0 2 0 4 138 140
Total Events/Month 38 26 585 231 3 1 2 10 37 23 665 291
Finance and Corporate Housing & Tech Social Work TOTAL
**Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury)
***A minor injury is an injury not covered by  Over 7 day, Over 3 day or Specified
****In process relates to records not yet investigated/defined by managers
*Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or penetrating
injury as defined by the HSE
Appendix 10
Analysis of Accidents / Incidents
From: 1 February 2025 - 31 March 2025 comparison with 1 February 2024 - 31 March 2024
Accidents by Month of Occurrence
Community and Enterprise Education
38

Page 39

APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total
Community and Enterprise 2 15 N/A 17 0 0 N/A 0 2 15 N/A 17 4 9 4 76% 17.76
Education 1 0 4 5 0 0 1 1 1 0 3 4 0 4 1 80% 5
Housing and Technical 2 0 N/A 2 0 0 N/A 0 2 0 N/A 2 0 1 1 50% 2
Social Work 2 6 N/A 8 0 1 N/A 1 2 5 N/A 7 6 1 1 88% 8
Total  (Feb - Mar 2025) 7 21 4 32 0 1 1 2 7 20 3 30 10 15 7 78% 32
Total  (Feb - Mar 2024) 5 22 2 29 1 3 1 5 4 19 1 24 19 7 3 90% 29
APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total
Total  (Feb - Mar 2025) 1 1 0 2 0 0 0 0 0 0 0 0 1 1 0 2 0
Total  (Feb - Mar 2024) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 February - 31 March 2025
Appeal's Panel
Total 0
Not Upheld Total
Appeals
Pending
0
Withdrawn
1
Resource
Resource
Action Taken
Upheld Upheld in Part
Manual/ Craft
Outcome of Disciplinary Hearings
Manual/ Craft
Upheld
APT&C
Upheld in Part
Teachers
% Held within
6 Weeks
No of Appeals
No Action
APT&C 4-6 6+3Teachers Total
No of Disciplinary Hearings
010
Appendix 11
Outcome of Appeals
Not Upheld
From: 1 February 2025 - 31 March 2025 comparison with 1 February 2024 - 31 March 2024
Appeals pending to date
Record of Disciplinary Hearings
No of weeks to convene Disciplinary Hearing
Total
39

Page 40

Appendix 12a
Record of Grievances
From: 1 February 2025 - 31 March 2025 comparison with 1 February 2024 - 31 March 2024
Grievances No of Grievances No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Total (Feb - Mar 2025) 4 0 1 0 3
Total (Feb - Mar 2024) 1 0 0 0 1
Dignity at Work
From: 1 February 2025 - 31 March 2025 comparison with 1 February 2024 - 31 March 2024
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Total (Feb - Mar 2025) 7 0 0 0 0 7
Total (Feb - Mar 2024) 0 0 0 0 0 0
40

Page 41

Referrals for Workplace Mediation
As at March 2025
Workplace Mediation Feb-25 Mar-25
No of Referrals 1 0
*No of Successful Cases 0 0
*No of Unsuccessful Cases 0 0
No of cases unsuitable for mediation 1 0
Workplace Mediation Feb-24 Mar-24
No of Referrals 0 0
*No of Successful Cases 0 0
*No of Unsuccessful Cases 0 0
No of cases unsuitable for mediation 1 0
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
Appendix 12b
41

Page 42

Appendix 13
From 1 February 2025 - 31 March 2025
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 4 9 0 4 4 21 35%
Personal Reasons 4 8 0 2 1 15 25%
Moving outwith area 1 1 0 0 1 3 5%
Child Caring / Caring
Responsibilities 0 1 0 0 1 2 3%
Further Education 0 1 0 0 0 1 2%
Other 5 7 0 2 4 18 30%
Total no. of leavers per Resource
eligible for an exit interview 14 27 0 8 11 60
Number of exit interviews
conducted 3 5 0 4 1 13
% of leavers interviewed 21% 19% 0% 50% 9% 22%
From 1 February 2024 - 31 March 2024
Total no. of leavers per Resource
eligible for an exit interview 31 30 6 12 26 105
Number of exit interviews
conducted 5 8 5 8 7 33
% of leavers interviewed 16% 27% 83% 67% 27% 31%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
42

Page 43

Appendix 14
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
2434 1058 202 43% 8% 19%
503 220 43 44% 9% 20%
1930 837 154 43% 8% 18%
156 83 7 53% 4% 8%
1731 841 143 49% 8% 17%
457 235 52 51% 11% 22%
2042 930 185 46% 9% 20%
316 81 6 26% 2% 7%
10 1 0 10% 0% 0%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
1736 602 187 35% 11% 31%
533 159 41 30% 8% 26%
1200 440 144 37% 12% 33%
67 36 5 54% 7% 14%
1125 399 126 35% 11% 32%
594 196 58 33% 10% 30%
1392 531 173 38% 12% 33%
307 62 10 20% 3% 16%
24 11 0 46% 0% 0%
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 February 2025 - 31 March 2025
Total Number of applications received: 2436
Total Number of Equal Opportunities Monitoring forms received: 2434
Total Number of posts advertised: 142
Total Number of appointments: 202
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
From : 1 January 2024 - 31 March 2024
Total Number of applications received: 1779
Total No of applicants aged under 50
Total Number of Equal Opportunities Monitoring forms received: 1736
Total Number of posts advertised: 302
Total Number of appointments: 227
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
43

Page 44

Appendix 15
Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3351 1198 365 239 1549 2404.42 5.00 1650.91 410.60 269.67 47.94 18.30 0.00 2.00 0.00
Education - Others 3169 97 94 551 2427 2438.90 5.00 1172.94 1063.60 136.40 48.00 11.00 0.00 1.96 0.00
Education - Teachers 4154 705 127 2140 1182 3544.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3544.20
Finance & Corporate Resources 813 184 22 360 247 721.38 8.00 89.59 338.44 207.13 56.22 22.00 0.00 0.00 0.00
Housing & Technical 1373 760 115 337 161 1266.27 3.00 188.00 676.43 354.95 32.89 9.00 0.00 2.00 0.00
Social Work Resources 2759 189 232 927 1411 2364.87 3.00 320.84 1449.61 472.02 84.80 33.60 0.00 1.00 0.00
9195.84 (excluding Teachers)
Total All Staff 15619 3133 955 4554 6977 12740.04 24.00 3422.28 3938.68 1440.17 269.85 93.90 0.00 6.96 3544.20
Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3387 1206 378 240 1563 2428.85 5.00 1669.72 416.48 269.41 47.94 18.30 0.00 2.00 0.00
Education - Others 3208 99 94 574 2441 2484.97 5.00 1207.06 1072.71 138.64 48.60 11.00 0.00 1.96 0.00
Education - Teachers 4127 708 121 2174 1124 3641.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3641.95
Finance & Corporate Resources 821 183 24 365 249 727.96 8.00 92.08 340.45 210.38 55.05 22.00 0.00 0.00 0.00
Housing & Technical 1392 770 116 341 165 1282.49 3.00 195.37 680.22 359.41 33.49 9.00 0.00 2.00 0.00
Social Work Resources 2781 194 230 949 1408 2386.60 3.00 332.43 1453.91 474.98 85.77 35.51 0.00 1.00 0.00
9310.87 (excluding Teachers)
Total All Staff 15716 3160 963 4643 6950 12952.82 24.00 3496.66 3963.77 1452.82 270.85 95.81 0.00 6.96 3641.95
Male Female Salary Band
Quarterly Joint Staffing Watch Return : Number Employed On 14 December 2024
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
Quarterly Joint Staffing Watch Return : Number Employed On 8 March 2025
Analysis by Resource
Analysis by Resource
Total Number of Employees Full-Time Equivalent
44

Page 45

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resource Plan: 
Quarter 4 Progress Report 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Finance and Corporate Resource Plan Quarter 4 Progress Report
2024/2025, for the period 1 April 2024 to 31 March 2025
[1purpose]
2. Recommendations
2.1. The Committee is asked to note the following recommendation(s):-
[
(1) that the Finance and Corporate Resource Plan Quarter 4 Progress Report
2024/2025 as summarised in paragraph 5.2. and attached as Appendix 2 of
this report, be noted; 
(2) that the key achievements made by the Resource for the year, as detailed in
paragraph 5.3. of this report, be noted; 
(3) that the area of improvement as detailed in paragraph 5.4. of this report, be
noted: and
(4) that the additional scrutiny of changes in measure status between Quarter 2
and Quarter 4 as summarised at paragraph 5.5. and detailed at Appendix 3 of
this report, be noted 
3. Background
3.1. The Finance and Corporate Resource Plan 2024/2025 was approved by Committee
on 22 May 2024 and sets out the outcomes, measures and actions to be managed
and delivered by the Resource for the financial year 2024/2025. 
3.2. The Resource Plan follows the agreed corporate structure and style.  The Plan is a
key element of the council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2024/2025
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2024/2025. These are detailed at Appendix 1.
7
45

Page 46

5. Quarter 4 Progress Report 2024/2025
5.1. Progress against all Resource Plan measures is contained in the Quarter 4 Progress
Report 2024/2025, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:- 
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report. To ensure adequate scrutiny of performance across all Resources, the
council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or ‘amber’
measures at a future meeting. 
The overall summary of progress to date is set out in the table below:- 
Status Measures
Statistical  Project  Total %
Blue N/A 8 8 22 %
Green  18 7 25 67 %
Amber  1 2 3 8 %
Red     1 0 1 3 %
Totals  20 17 37 100%  
(Data correct as at 21 May 2025) 
5.3. Key achievements for 2024/2025 are noted below:-  
5.3.1. 
Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
Individuals and
communities in South
Lanarkshire are
engaged and able to
participate in decision-
making processes
The Community Wish List has continued to thrive, with 36
Community Wishes received from a range of community groups
across South Lanarkshire. 23 Wishes have been answered, with
a range of financial donations, goods and materials, reallocation
of furniture items from council South Lanarkshire Leisure and
Culture (SLLC) property (totalling £27,918). To date this financial
year, the project has totalled over £83,000 
46

Page 47

Connect Outcome  Education and Learning
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Health and Wellbeing 
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Children and Young People
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Housing and Land
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome  Our Economy
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
5.3.2. In addition to working towards these Outcomes, we recognise that the council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and achieving Best Value
Resource
Outcome
Achievement 
Customers
experience high
quality and
improving council
services
The Customer Services Development Team and Customer
Service Centre continue to review our current processes and
identify areas for improvement.  This has involved the
development of new online forms and moving towards integration
where possible, with recent developments in both fly tipping and
pest control.  These improvements are part of our programme to
provide our customers with increased accessibility to services with
forms being available online out with normal Council working
hours. 
47

Page 48

The council
demonstrates high
standards of
governance and
sound financial
stewardship
A set of audited Accounts has been produced and received a
clean audit certificate. These were approved for signature by the
Risk and Audit Scrutiny Committee before the submission date of
30 September 2024.
With assistance from the Improvement Service, the council
developed an SLC-focused Local Government Benchmarking
Framework (LGBF) dashboard reflecting the council's strategic
priorities as set out in the Council Plan, Connect. Following
presentation at the PRSF on 28 May 2024, the dashboard was
made available to the public via a link on the performance pages
of the council's website.
The workforce has
the skills, flexibility
and capacity to
deliver the council’s
priorities.
During the period 1 April to 31 March 2025, SLC employees
completed 74,849 eLearning modules. 
In the same period 9,863 employees attended 945 classroom-
based events, and 1,429 employees attended 134 virtual online
events.
Digital and ICT
service meet the
needs of the council
and its customers
Oracle Fusion - all modules are now live, out of hyper-care and in
normal support
Primary, Additional Support Needs and Early Years Refresh - 141
establishments were upgraded with over 4,000 devices delivered.
Education establishments wireless expansion programme - over
30 establishments now have upgraded wireless functionality.
Roads Asset Management system replacement now live. 
5.4. Areas for improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why, and the
management action now being taken, where applicable. 
Delivering the plan and achieving Best Value
Resource Outcome:   The council demonstrates high standards of governance
and sound financial stewardship
Measure  Comments/Progress Action by Manager 
(where applicable)
Liquor licensing
processing –
target 97% 
Despite the monthly totals for Q4 improving:
January 2025       75.26%
February 2025      95.04%
March 2025          93.69%
only 80.5% of liquor licenses were processed
within service targets.
The slippage occurred due to:
a) Personal licence applications not being
processed within 10 working days of a
favourable Police report,
b) Occasional and extended hours applications
where the licence has not been issued 5
days prior to the event: however, the licences
were all issued before the event and
c) Minor variations not processed within 10
working days of receipt.
Team Leaders have
been reminded to
allocate tasks
depending on the
nature of the business
within performance
targets where
possible. 
48

Page 49

Whilst the target has not been met over the
year, improvements have been made, and we
will continue to ensure priority is given to urgent
time critical service requests. 
5.5.  Scrutiny of change in measure status 
A further analysis introduced to aid scrutiny of performance, is to highlight and
explain all measures that have changed status from Quarter 2 to Quarter 4.  On
analysis of these, one measure improved, three measures declined in performance.
Details of these four measures are included at Appendix 3.  The remaining measures
under scrutiny changed from Green or Report later to Blue (complete)/Green and
need no further action. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2024/2025. 
9.  Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10.  Integrated Impact Assessment and Consultation Requirements
10.1.   This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2.  There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources)
49

Page 50

13 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027 
Previous References
 Finance and Corporate Resources Quarter 4 Progress Report 2023/2024 
List of Background Papers
 Council Plan Connect 2022 to 2027 – approved by the full Council on 15 June 2022
 Finance and Corporate Resource Plan 2024/2025 – approved by Finance and
Corporate Resources Committee on 22 May 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little (Head of Communications and Strategy)
Ext:  4904 (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk
50

Page 51

Appendix 1 
Finance and Corporate Resource Outcomes 2024-25  
Connect Outcomes  Resource Outcomes
Communities and
Environment 
• Individuals and communities in South Lanarkshire are
engaged and able to participate in decision-making
processes
Education and
Learning 
• No Resource Outcomes for this Connect Outcome
Health and
Wellbeing
• No Resource Outcomes for this Connect Outcome
Children and Young
People 
• No Resource Outcomes for this Connect Outcome
Housing and Land  • No Resource Outcomes for this Connect Outcome
Our Economy  • No Resource Outcomes for this Connect Outcome 
Delivering the Plan
and achieving Best
Value
• The council demonstrates high standards of governance
and sound financial stewardship
• Customers experience high quality and improving council
services
• The workforce has the skills, flexibility and capacity to
deliver the council’s priorities
• Digital and ICT services meet the needs of the council and
its customers 
51

Page 52

52

Page 53

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 21 May 15:56
Quarter 4 : April 2024 - March 2025
South Lanarkshire Council
Finance and Corporate Resources
Resource Plan
(This represents the cumulative position to March 2025)
Performance Report 2024-25
7
53

Page 54

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 21 May 15:56
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 0 0 0 0 0
Education and Learning 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 0 0 0 0 0
Delivering the plan and achieving best value 18 1 1 0 20
Total 18 1 1 0 20
Page 1
54

Page 55

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Pay invoices within the target of 28 days Payment of invoices within 28 days exceeded the target of 92.5% during
24/25. Although performance at 93% was lower than the previous year
at 94%, this is a positive position given the implementation of the new
Fusion system for invoice payments from April 2024.
Green 92.5% 93.0% 93.4% 91.7% 94.0%
Percentage of income due from Council
Tax received by the end of the year - in
year (incl water)
The annual Council Tax collection target for 2024-25 was set at 95.5%.
A Council Tax collection rate of 95.69% was achieved, ahead of target
by 0.19%.
Green 95.50% 95.69% 95.54% 96.77% 95.70%
% of Non Domestic rates income achieved A NDR collection rate of 98.4% was achieved, which was better than the
target.
Green 97.5% 98.4% 97.5% 97.8% 97.8%
Sundry Income collection An annual collection target of 97.5% was set for Sundry Debt in 2024-25
and a collection rate of 98.2% was achieved.
Green 97.5% 98.2% 98.1% 98.3% 96.9%
Liquor licensing processing target - 97%
within service targets
Despite improvements in performance in February and March 2025 the
annual result fell below the target. Workload is prioritised depending on
the nature of business and priority is given to urgent time critical service
requests.
Red 97.0% 80.5% 92.0% 96.0% 94.0%
Registration processing target - 97.5%
within service targets
Despite improvements in performance in Quarter 4 the annual result fell
below the target. Workload is prioritised depending on the nature of
business and priority is given to urgent time critical service requests.
Amber 97.5% 95.0% 93.0% 99.0% 99.0%
Citizenship processing target - 97.5%
within service targets
Target has been achieved Green 97.5% 100.0% 100.0% 100.0% 100.0%
Complaints processing target - 97.5%
within service targets
Target has been achieved Green 97.5% 100.0% 100.0% 100.0% 100.0%
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Customer Service Centre - % of calls
answered
We have exceeded our 2024-25 target of 90% Green 90.00% 94.00% 93.00% 94.00% 91.00%
Customer Service Centre – average queue
time (in seconds)
We have exceeded our target of 300 seconds for 2024-25 Green 300 187 158 134 252
Benefits administration – average
processing times for new Housing Benefit
and Council Tax Reduction claims
Actual performance of 11 days for processing new claims achieved
against target of 14 days.
Green 14 days 11 days 13 days 12 days 11 days
Page 2
55

Page 56

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Benefits administration – average
processing times for Housing Benefit and
Council Tax Reduction change in
circumstances
Actual performance of 2 days for processing change in circumstances
achieved against target of 4 days.
Green 4 days 2 days ------ ------ 2 days
Housing Benefit and Council Tax
Reduction – accuracy of processing
Accuracy rate of 95.3% achieved against target of 94.5%. Green 94.5% 95.3% 94.4% 97.1% 95.8%
Scottish Welfare Fund – average
processing times for Crisis Grants
2024/25 average processing times for Crisis Grants equal to target. Green 2 days 2 days 2 days 2 days 2 days
Scottish Welfare Fund – average
processing times for Community Care
grants
The 2024-25 average processing times for Community Care Grants was
under target by 3 working days.
Green 15 days 12 days 16 days 13 days 17 days
Money Matters Advice – customer service -
% cases responded to within 5 days of
initial customer contact
Target achieved Green 95.00% 97.00% ------ ------ 98.00%
Money Matter Advice – to write off 20% of
all debt dealt with by bankruptcy or creditor
write offs (New)
Target met.  This year saw an increase in debt write off but also higher
statutory debt options being implemented for clients
Green 20.0% 20.0% ------ ------ ------
Money Matters Advice – 85% of all claims
for benefits to be successful (New)
Target achieved Green 85.0% 89.0% ------ ------ ------
Complete food and fuel bank referrals
within 24 hours of request (New)
Target achieved Green 95.0% 98.0% ------ ------ ------
Make Financial Wellbeing Support Fund
(FWSF) Cash First payments within 24
hours of request (New)
Target achieved Green 95.0% 97.0% ------ ------ ------
Page 3
56

Page 57

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 1 4 0 0 0 5
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0 0
Children and Young People 0 0 0 0 0 0
Housing and Land 0 0 0 0 0 0
Our Economy 0 0 0 0 0 0
Delivering the plan and achieving best value 7 3 2 0 0 12
Total 8 7 2 0 0 17
Page 4
57

Page 58

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Communities and Environment
Individuals and communities in South Lanarkshire are engaged and able to participate in decision-making processes
Action Measures Comments/ Progress Status
Increase routes for
communities to
participate in decision
making and priority
setting
Increase activity around our Place Based Participatory
Budgeting programme in priority neighbourhoods
Place Based Participatory Budgeting (PB) activity has increased
significantly. In the most recent round of PB, 8,359 residents across 9
neighbourhood planning areas participated in the public vote, deciding
on the allocation of £155,000 of public funds.
87 community led projects were presented to the vote, 37 projects
were fully funded, 6 were part funded.
Green
Increase the number of communities with their own
community-led neighbourhood plans
Nine neighbourhood plans are in place and being delivered. Plans are
reviewed annually to ensure the priorities reflect local need and
aspirations. One neighbourhood plan is in the final stages of
development.
Green
Implement new approaches to community involvement in
decision making such as a community Wishlist approach to
community benefits
The Community Wish List has continued to thrive, with 36 Community
Wishes received from a range of community groups across South
Lanarkshire. 23 Wishes have been answered, with a range of financial
donations, goods and materials and reallocation of furniture items from
SLLC property, totalling £27,918. to date this financial year, the project
has totalled over £83,000.
Green
Take forward IT strategic
developments
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements, including improved
availability and affordability of broadband and 4G/5G mobile
services across the council area
Revised business case developed and remains under consideration. Green
Develop action plan on Digital Inclusion as key stakeholder
of the Digital Inclusion sub-group.
Digital inclusion subgroup terms of reference revised and action plan
agreed for 24/25.
Complete
Page 5
58

Page 59

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Action Measures Comments/ Progress Status
Lead financial planning
and reporting for the
council
Financial Strategy to be agreed by June 2024 The Council's Revenue Budget Strategy for 2025-26 was approved by
Council on 26 June 2024. An update was approved by the Executive
Committee in November 2024. The budget process is now complete
with the 2025-26 Budget now set.
Complete
Budget proposals to be considered by members by
December 2024
A Members' Seminar took place in October 2024 as well as a paper
being presented to the November 2024 Executive Committee. This
presented savings proposals for consideration by members. The
Budget set in February 2025 included consideration of budget
proposals.
Complete
Budget agreed by March 2025 The Budget and Council Tax was set at a Special Council meeting on
26 February 2025, before the statutory date of 11 March 2025.
Complete
Capital programme for 2025-26 to be agreed by March 2025 The Council's Capital Programme for 2025-26 Budget was set on 26
February 2025.
Complete
Take forward IT strategic
developments
To further develop SLC’s approach to and engagement with
the LGBF, create a be-spoke version of the Local
Government Improvement Service LGBF dashboard to
enhance the analysis and presentation of LGBF results.
With assistance from the Improvement Service, the council developed
an SLC-focused LGBF dashboard reflecting the council's strategic
priorities as set out in the Council Plan, Connect. Following
presentation at the PRSF on 28 May 2024, the dashboard was made
available to the public via a link on the performance pages of the
council's website.
Complete
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Provide effective and
responsive customer
services
Continuous improvement in the provision and uptake of
digital customer contact options
The dates noted on the Customer Engagement Review action plan are
on target.  A report on progress will be presented to the next Corporate
Management Team meeting
Green
Page 6
59

Page 60

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Monitor the progress of
transformation projects
through reporting
framework to CMT
Report progress of transformational projects regularly to
CMT
The Transformational Programme remains ongoing with project
updates being regularly reported to CMT and the Performance and
Review Scrutiny Forum (PRSF).
Green
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Take forward IT strategic
developments
Migrate to new Integrated Housing and Property
Management system
Go live has been pushed back to June 2025. Amber
Develop and deliver training plan to upskill IT staff in new
technologies
Training requirements delivered as planned. Complete
Migrate to new Social Work Information system Project delayed to June 2025. Amber
Migrate all analogue telephony services to technology to
align with Ofcom 2025 switch off
Project remains on track. Green
Migrate to new Fusion platform, Oracle’s cloud-based
Human Resources (HR) and Finance solution.
All modules now live and in normal support. Complete
Page 7
60

Page 61

Appendix 3 
FCR: Quarter 2 to Quarter 4 2024-25 - scrutiny of change in measure status 
Measure Q2
Status
Q4 
Status
Q4 Comments
Performance has improved from Q2 to Q4
Money Matter Advice –
to write off 20% of all
debt dealt with by
bankruptcy or creditor
write offs (New) 
Red  Green  Target met at year end. 
Performance has declined from Q2 to Q4
Liquor licensing
processing target - 97%
within service targets
Amber Red -see para 5.4 in covering report for details
Despite the monthly totals for Q4 improving:
only 80.5% of liquor licenses were processed within
service targets. 
Migrate to new
Integrated Housing
and Property
Management system
Green Amber Go live has been pushed back to June 2025
Migrate to new Social
Work Information
system
Red Amber Project delayed to June 2025. 
7
61

Page 62

62

Page 63

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resource Plan 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Finance and Corporate Resource Plan 2025/2026 for approval and
note the monitoring arrangements
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Resource Plan 2025/2026, attached as Appendix 1, be approved;
(2) that the Resource Plan 2025/2026 be uploaded onto the Council’s website
following consideration by this Committee; 
(3) following Committee approval, all Resource Plans will be presented to
Executive Committee on 25 June 2025, for noting; and
(4) that Progress Reports on the Resource Plan 2025/2026 be provided at
Quarter 2 and Quarter 4 to future meetings of this Committee. 
3. Background
3.1. The Resource Plans for 2025/2026 were prepared in line with the corporate
Resource Planning guidance. 
3.2. The Resource Plan is a key element of the Council’s performance management
arrangements.  It provides details of the context within which the Resource operates
and establishes actions and measures for the year ahead based on the priorities and
outcomes set out in the Council Plan Connect 2022 to 2027. 
3.3. Performance management is a keystone of Best Value and ensures that the Council
can demonstrate sound governance arrangements.  The Resource Plan is one part
of the Council’s framework for planning and budgeting and demonstrates how this
leads to effective front line service delivery. 
3.4. As part of this framework, the Resource Plan reflects the aspirations of the Council
Plan and the Community Plan as well as being complemented by the details of
individual Service, Business and other Plans.  Ultimately, these details are included
in the key work objectives of individual officers.  This demonstrates the ‘Golden
Thread’ of performance management which ensures a clear understanding of the
Council’s vision, values, priorities and outcomes at all levels. 
8
63

Page 64

3.5. The current format for performance reporting has been established since 2007 and is
used for Executive Directors’ reports to the Chief Executive, Resource Management
Teams, Resource Committees and the Performance and Review Scrutiny Forum. 
The focus has been on reporting progress on Council outcomes, statutory
performance indicators, other key performance measures and high-level Resource
outcomes.  Progress reports are provided at Quarter 2 and Quarter 4 to this
Committee. 
3.6. In preparing the Plan, account has also been taken of the need to ensure a robust
response to Risk Management and Control.  Risks associated with delivery of the
actions in this Resource Plan have been identified and evaluated and are listed in
the Resource Risk Register.  Where necessary, controls or further actions to mitigate
these risks have been agreed.  Such actions are tracked through the Resource Risk
Control Plan which is kept under review by the Risk Sponsor for the Resource. 
3.7. Following approval at individual Resource Committees, all Resource Plans will be
presented, as a pack, to Executive Committee on 25 June 2025, for noting. 
4. Resource Plan 2025/2026
4.1. The Resource Plan 2025/2026 is attached as Appendix 1 and is structured around
the following headings:- 
1. Introduction 
2. Key areas for the year ahead 
3. Resource outcomes 
4. Measures and actions 
5. Resourcing the Plan 
4.2. Resource Outcomes 2025/2026
The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2025/2026.  To support these outcomes, the Resource has
developed performance measures in an action plan which is set out in section 4 of
the Resource Plan.  Key or strategic measures will be included in the Council Plan
Connect Progress Reports 2025/2026, with the rest being monitored and reported at
Resource level. 
4.3. Monitoring and reporting 
As part of the performance management arrangements, the Committee will receive a
mid-year update of progress on the measures in the Resource Plan covering the
period 1 April 2025 to 30 September 2025 (Quarter 2) as well as an end of year
progress report covering the full year 1 April 2025 to 31 March 2026 (Quarter 4). 
5. Employee Implications
5.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and, in turn, the Performance Appraisal process for individual
employees. 
6. Financial Implications
6.1. The outcomes within the Resource Plan are reflected in the respective Resource
Revenue and Capital budgets and, longer term, within the framework of the Council’s
approved Financial Strategy.
64

Page 65

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change or environmental implications as a result of this report. 
7.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy. 
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2025/2026. 
8. Other Implications
8.1. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
9. Integrated Impact Assessment and Consultation Requirements
9.1.     This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
9.2.    There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
13 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values, Priorities and
Outcomes in the Council Plan Connect 2022 to 2027 
Previous References
 None 
List of Background Papers
 Council Plan 2022-2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little (Head of Communications and Strategy)
Ext:  4904  (Tel: 01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk 
65

Page 66

66

Page 67

Finance and Corporate Resources 
Finance and Corporate Resource Plan 2025-26 
8
67

Page 68

Section Contents
1.0 Introduction
2.0 Key areas of focus for the year ahead
3.0 Resource outcomes
4.0 Measures and actions
5.0 Resourcing the plan
68

Page 69

Section One – Introduction 
I am pleased to introduce our Resource Plan for 2025-26 which sets out outcomes and
priorities for the coming year.
The four services within Finance and Corporate Resources help to ensure that the council
operates successfully in an increasingly complex and challenging environment, and although
diverse, each service is essential to the running of the council and the delivery of its vision, values,
and priorities. 
Administration and Legal Services provides essential support for the core democratic and
governance arrangements of the council as well as providing a full range of legal advice and
support, managing electoral events and licensing and registration services to the public. 
Finance Services provides sound financial stewardship to ensure the council’s priorities are
effectively funded and expenditure, including procurement, is appropriately monitored, controlled,
and reported.  Finance Services is split between transactional activities including payables,
procurement, risk management and insurance, benefits and revenues, customer services and
money matters advice; and Strategy which includes budget strategy, budget monitoring and
providing financial support to all Resources. 
Information Technology Services supports all council services through the maintenance of over
5,000 computers and servers running over 200 business applications across council Resources. 
This delivery is supported by council-wide networks covering telephones, printing, mail, and
internet technologies. 
Personnel Services is responsible for the delivery of the personnel provision within the council
and covers providing information and support to employees and the implementation of personnel
policies.  This includes personnel, payroll, employee learning and organisational development;
complaints and consultation; delivery of training, further education and apprenticeships, health,
safety, and wellbeing.  And is responsible for the co-ordination and implementation of equality
and human rights legislation, good practice, and supporting and promoting diversity, equity, and
inclusion for all. 
The Resource is also responsible for Internal Audit, which provides assurance on the
effectiveness of the council’s risk management, control, and governance arrangements. 
Communications and Strategy (which is part of the Chief Executive’s Office) provides a range of
key corporate services in support of all Resources as well as accurate, timely information for
employees and residents.  The service is responsible for the council's publications, its websites,
intranet, and social media.  It also co-ordinates all Media enquiries.  The service incorporates the
Resilience team, the Research and Improvement Unit as well as the Community Engagement
Team, which provides support to the Community Planning Board, and provides a single interface
for community engagement including neighbourhood planning. 
Jackie Taylor
Executive Director
Finance and Corporate Resources
69

Page 70

Section Two – Key areas of focus for the year ahead 
2.0. Overview
The Resource has identified the main challenges, risks and new developments which will have
significant impact on the delivery of services in the coming year.  These are outlined briefly
below. 
2.1. Cost of Living
In recent years the UK experienced the worst cost-of-living crisis in 40 years and the impact is
ongoing.  While all sectors of society continue to see prices rise the impacts are greatest for
those on the lowest incomes.  The council recognises the pressures being faced by households
across South Lanarkshire and acknowledges the additional demands on council services as a
result.  The council has in place a range of support which can help households manage scarce
resources and services will continue to explore all avenues to support the most vulnerable in the
year ahead. 
2.2. Financial Strategy
The Resource leads on financial planning and reporting for the council.  Over recent years, the
challenges for Local Government finance have continued, around balancing pressures of
meeting additional demand and costs of delivering services.  The challenges local authorities
have faced have been extraordinary and these financial challenges are anticipated to continue. 
The budget gap faced by the council in recent years has meant that the council has had to
consider how and what services we can deliver going forwards.  A key part of the financial
management process is the development of Financial Strategies, developing financial plans
which deliver the council’s visions, values, and priorities, while at the same time recognising and
responding to financial constraints.  Financial strategies are prepared annually and approved by
members leading to the final approval of annual budgets.  This process includes consideration
and approval of efficiency and savings options and considers requirements for investment.  In
the current financial environment, the challenges around consideration and approval of savings
options will be key.  The council’s programme of Transformational Reviews (both Resource
specific and council-wide) continues to play a key role in addressing the Budget Gap identified in
the council’s Budget Strategy. (see section 2.8.)  The strategic approach to financial planning
also includes planning for Capital programmes of work. 
2.3. Involving Our Communities
Our Council and Community plans both reflect the priorities of our communities and connect to
the neighbourhood plans created in smaller areas of South Lanarkshire.  We will continue to
progress delivery of these, developing appropriate ways to codesign services with local people. 
Our ambition is that all communities in South Lanarkshire are empowered to lead on their local
priorities and can see positive changes taking place through the way we work together.  We will
continue to support community groups to represent the views of their neighbours and to work
together to address issues that matter to them. 
We will work to develop opportunities for our community to take action themselves, including
continuing to support community asset transfer and helping them to take action to improve
sustainability. 
2.4. Strategic Workforce Planning 
The council workforce plan outlines the challenges facing the council workforce, identifies the
key strategic drivers and service demands on the horizon for the council and defines a set of
actions that will develop and build on the existing workforce to meet council service demands.
70

Page 71

This ensures that the council has the right people in the right place at the right time with
sufficient employee resources to deliver services.  Each Resource within the council reviews its
workforce data to establish the challenges and opportunities that this presents and key themes
and an action plan are developed to meet forecasted future workforce requirements.
The Strategic Workforce Plan will include the council’s approach to its workforce, which supports
the ‘people’ elements of our workforce strategy and plans.  South Lanarkshire Council and its
employees continue to go through a period of change which will impact on how we deliver services
in the future.  The Strategy will continue to ensure the impact of the key challenges facing councils
is reflected, mitigated where possible, and risks managed. 
2.5. Oracle Fusion
The Oracle system (People Connect/HRMS, FMS) has been successfully migrated to Fusion,
Oracle’s cloud-based Human Resources (HR) and Finance solution.  This was a significant
change programme affecting the whole workforce and work will continue to focus on delivering
significant improvements to processes, workflow, support agile working, employee self-service
and engagement as well as greater levels of automation and improved management information. 
This change project will also provide a platform for continuing service improvements and efficiency. 
2.6.   Strategic digital developments
The council is continuing to invest in digital technologies to improve the delivery of services to
citizens, streamline and standardise business processes, and improve collaboration and
partnership working (for example Health and Social Care Partnership - HSCP).  This investment
is targeted at delivering significant productivity improvements and cost savings.  Information
Technology (IT) has a major part to play in the ongoing digital transformation of the council by
implementing and supporting new technologies at pace and at scale, including emerging areas
encompassing artificial intelligence.
IT projects will continue to be prioritised based upon need, business case and alignment with
council Priorities.  Partnerships with Local Government Digital Office, NHS Lanarkshire, Scottish
Government, and key suppliers will be leveraged to share best practices and accelerate rollout
and adoption of new digital solutions.  IT will continue to maintain high levels of availability of IT
estate and high levels of support to officers and elected members.  Key IT activities will include
the move from analogue to digital telephony in line with Ofcom’s national programme,
replacement of key legacy business applications (for example Housing and Property, Social
Work and Telecare alarm receiving) and the rollout of digital connectivity solutions to improve
performance and security of internet access, deliver wider economic benefits through digital
connectivity and support digital inclusion. 
2.7.   Sustainable Development and Climate Change
The council acknowledges the serious and immediate threat of climate change and is committed
to accelerating the pace of action in response to the climate emergency and in Scotland’s
transition to a net-zero and climate resilient society and economy.  It is expected that, as a public
body, the council leads by example and uses its role to influence area-wide climate change,
action and sustainability.  The Sustainable Development and Climate Change Strategy (2022-27)
sets out how the council aims to develop sustainably and tackle climate change.
The overall picture is one of clear aspirations and commitment, but residual risks scores reflect
the challenges and remain very high corporately even despite the level of mitigations that are
being put in place.  Over time, how to fund will remain one of the most significant risks. 
2.8. Continued Development of the Council Transformation Programme
The council has had a programme of transformation reviews over recent years, which have fed
through to deliver outcomes in terms of savings, efficiencies, and transformation programmes.
71

Page 72

Change has been the one constant in recent years, and this is reflected in the guidance to
support managers to deliver their transformational projects.  It is important that managers and
leaders are equipped to lead transformation, and that review and improvement processes are
adopted and welcomed.  Through addressing the ongoing financial challenges, there is the
opportunity to shape council services which are responsive, flexible, and fit for the future.  A
transparent process which is understood by all involved, the early involvement of those affected,
and honest evaluation of options are key features of our continued approach. 
2.9.  Customer Engagement 
A review of customer engagement across the council is being led by Finance and Corporate
Resources.  The review will assess the range of systems and processes used to support customer
contact and identify opportunities for improvement including the consideration of the digital
technologies.  Other activities include the appraisal of the strategic positioning of customer services
within the council and ensuring the needs of stakeholders are met. 
2.10. Digital Transformation
The Digital Transformation review is led by Finance and Corporate Resources and defines three
key areas of transformation: Business Systems and Processes, Workforce Productivity, and
Customer Engagement, which is a separate review. 
The review will assess the current digital maturity of the council, develop a clear vision for digital
transformation, and identify opportunities for improvement through the use of digital
technologies.  It will also involve the development of a detailed project plan, standard methods
and approaches to transformation, and engagement with external expertise and support where
required. 
The ultimate goal is to improve process efficiency, optimise service delivery, and ensure that digital
services are accessible to all residents.  The review will also support the demonstration of best value
and alignment with the Audit Scotland report on 'Transformation in councils’. 
72

Page 73

Section Three – Resource Outcomes 
3.1. Resource Outcomes
Finance and Corporate Resources has established the following Resource outcomes to support the
delivery of Connect Outcomes in 2025-26. 
Connect Outcomes Resource Outcomes
Communities and
Environment
• Individuals and communities in South Lanarkshire are
engaged and able to participate in decision-making
processes
Education and Learning • No Resource Outcomes for this Connect Outcome
Health and Wellbeing • No Resource Outcomes for this Connect Outcome
Children and Young
People
• No Resource Outcomes for this Connect Outcome
Housing and Land • No Resource Outcomes for this Connect Outcome
Our Economy • No Resource Outcomes for this Connect Outcome 
3.2. Delivering the Plan and achieving Best Value
In working towards the six Outcomes, the council aims to continually improve and ensure effective
and efficient use of resources, and our business will be conducted with integrity, transparency and
will operate to the highest standards.
Finance and Corporate Resources has established the following Resource outcomes to support
Delivering the Plan and achieving Best Value. 
Delivering the Plan
and achieving Best
Value 
Resource Outcomes
• The council demonstrates high standards of
governance and sound financial stewardship
• Customers experience high quality and improving
council services
• The workforce has the skills, flexibility, and
capacity to deliver the council’s priorities
• Digital and ICT services meet the needs of the council
and its customers
73

Page 74

Section Four – Measures and actions 
4.0. Performance measures and action plan
This section of the Resource Plan is divided into two parts: part (a) sets out our main
performance measures against our outcomes; and part (b) describes the key actions we will take
in the coming year to respond to the challenges ahead and improve services and outcomes. 
4.a. How we will measure our performance
The table below shows our key performance measures, with actual data last reported to
Committee and the target for the last financial year and 2025-26.  Additional context for the
results/targets is provided within the notes column, where applicable. 
Resource Outcome: The council demonstrates high standards of governance and sound
financial stewardship 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target Links Service Notes
1. Pay invoices
within the target
of 28 days (local
target)
94.0%  92.5%  92.5% 07.02 Finance
(Trans)
Target has remained
the same
2. Percentage of
income due
from Council
Tax received by
the end of the
year - in year
(incl water)
(local target)
95.7% 95.5% 95.6% C07.02 Finance
(Trans)
Increased target to
reflect collection
levels in 2024-25 to
date.
3. % of Non-
Domestic rates
income
achieved (local
target)
97.8% 97.5% 97.6% 07.02 Finance
(Trans)
Increased target to
reflect collection
levels in 2024-25 to
date.
4. Sundry Income
collection (local
target)
96.9% 97.5% 97.5% 07.02 Finance
(Trans)
Target remains the
same and is realistic,
based on collection
levels experienced in
2024-25.
5. Liquor licensing
processing
target - 97%
within service
targets (local
target)
94% 97% 97% 07.01 Admin and
Legal
This year’s target
remains the same and
is realistic, based on
the service’s
experience and
workload.
74

Page 75

Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
6. Registration
processing
target – 97.5%
within service
targets (local
target)
99.0% 97.5% 97.5% 07.01 Admin and
Legal
Target has
remained the
same
7. Citizenship
processing
target – 97.5%
within service
targets (local
target)
100% 97.5% 97.5% 07.01 Admin and
Legal
Target has
remained the same
8. Complaints
processing
target – 97.5%
within service
targets (local
target)
100% 97.5% 97.5% 07.01 Admin and
Legal
Target has
remained the same
9. Respond to
FOI/EIR Requests
within the
statutory
timescale 
96% 96% 96% 07.02 Admin &
Legal
Measure included
to recognise the
importance of this
duty
10. Respond to Data
Protection Subject
Access Requests
within the
statutory
timescale 
82% 90% 90% 07.02 Admin &
Legal
Measure included
to recognise the
importance of this
duty     
75

Page 76

Resource Outcome: Customers experience high quality and improving council services 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target Links Service Notes
11. Customer
Service Centre
- % of calls
answered (local
target)
91%  90% 90% C07.01 Finance
(Trans)
Target remains the
same
12. Customer Service
Centre – average
queue time, in
seconds (local
target)
252
seconds
300
seconds
250
seconds
C07.01 Finance
(Trans)
Target updated and
continues to
provide customers
with a responsive
service. Online
contact options
continue to be
offered, providing
24-hour access to
many council
services.
13. Benefits
administration –
average
processing times
for new Housing
Benefit and
Council Tax
Reduction claims
(local target)
11 days 14 days 14 days 07.01 Finance
(Trans)
Target remains the
same and compares
favourably with
processing times of
top quartile of
councils in Scotland.
76

Page 77

Resource Outcome: Customers experience high quality and improving council services 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target Links Service Notes
14. Benefits
administration –
average
processing
times for
Housing Benefit
and Council
Tax Reduction
change in
circumstances
(local target)
2 days 4 days 4 days 07.01 Finance
(Trans)
Target remains
the same. Target
compares
favourably with
processing times
of top quartile of
councils in
Scotland.
15. Housing Benefit
and Council
Tax Reduction
– accuracy of
processing
(local target)
95.8% 94.5% 95.0% 07.01 Finance
(Trans)
Target increased
to recognise the
importance of
continued
improvement in
accuracy
16. Scottish
Welfare Fund –
average
processing
times for Crisis
Grants
(National target)
2 days 2 days 2 days 07.01 Finance
(Trans)
Target remains
the same.
Statutory
timescale.
17. Scottish
Welfare Fund –
average
processing
times for
Community
Care grants
(National target)
17 days  15 days 15 days 07.01 Finance
(Trans)
Target remains
the same.
Statutory
timescale.
18. Money Matters
Advice –
customer
service - %
cases
responded to
within 5 days of
initial customer
contact (local
target)
98%  95% 96% 07.01 Finance
(Trans)
Target updated
77

Page 78

Resource Outcome: Customers experience high quality and improving council services 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target Links Service Notes
19. Money Matters
Advice – 86%
of all claims for
benefits to be
successful
N/A  85%  86% 07.01 Finance
(Trans)
1% increase in
target to more
closely reflect
actual
performance.
(new measure in
2024-25)
20. Complete food
and fuel bank
referrals within
24 hours of
request
N/A 95% 97% 07.01 Finance
(Trans)/
Money
Matters
Advice
Target updated
21. Make FWSF
Cash First
payments within
24 hours of
request
N/A 95% 95% 07.01 Finance
(Trans)/
Money
Matters
Advice
Target remains
the same 
4.b. What actions we will take in 2025-26 
Resource Outcome: Individuals and communities in South Lanarkshire are engaged and able to
participate in decision-making processes 
Action Milestones/Steps we will take to deliver our
actions
Links Service
1. Increase routes for
communities to
participate in
decision making
and priority setting
Increase participation in Stakeholder Groups and
the delivery of Neighbourhood Plans
01.05 Community
Engagement
Team
2. Support local
communities to work
together to address
issues that matter to
them by growing their
tools to do so:
capacity, resources,
assets.
Increase Community Asset Transfer Support for
Communities
01.16 Community
Engagement
Team
3. Increase routes for
communities to
participate in
decision making and
priority setting
Develop new Community Engagement and
Participation Strategy 2026-2031 
C07.02 Community
Engagement
Team
4. Take forward IT
strategic
developments
Complete procurement exercise to identify
partner to meet SLC Digital Connectivity
requirements, including improved availability and
affordability of broadband and 4G/5G mobile
services across the council area
C01.07 IT
78

Page 79

Take forward IT
strategic
developments
Deliver action plan on Digital Inclusion as key
stakeholder of the Digital Inclusion sub-group.
01.07 IT 
Resource Outcome: The council demonstrates high standards of governance and sound
financial stewardship 
Action Milestones/Steps we will take to deliver our
actions
Links Service
5. Lead financial
planning and
reporting for the
council
Financial Strategy to be agreed by June 2025 07.02 Finance
(Strategy)
Lead financial
planning and
reporting for the
council
Budget proposals to be considered by
members by December 2025
07.02 Finance
(Strategy)
Lead financial
planning and
reporting for the
council
Budget agreed by March 2026 07.02 Finance
(Strategy)
Lead financial
planning and
reporting for the
council
Capital programme for 2026-27 to be agreed by
March 2026
07.02 Finance
(Strategy)
6. Lead on strategic
planning
Develop a mid-term review of the Council Plan,
Connect for consideration by Elected Members
in April 2025.
C07.02 Comms and
Strategy
7. Take forward IT
strategic
developments
To improve the availability and accessibility of
local intelligence about South Lanarkshire and
its communities, develop a dashboard of key
facts aligned with Council Plan outcomes by
March 2026.
07.04 Comms and
Strategy 
Resource Outcome: Customers experience high quality and improving council services 
Action Milestones/Steps we will take to deliver our
actions
Links Service
8. Provide effective and
responsive customer
services
Continuous improvement in the provision and
uptake of digital customer contact options
07.01 Finance
(Trans)
9. Monitor the progress
of transformation
projects through
reporting framework
to CMT/PRSF
Report progress of transformational projects
regularly to Performance and Review Scrutiny
Forum (PRSF)
07.01 Finance
(Strategy) 
79

Page 80

Resource Outcome: Digital and ICT services meet the needs of the council and its customers 
Action Milestones/Steps we will take to deliver our
actions
Links Service
10. Take forward IT
strategic
developments
Migrate to new Integrated Housing and
Property Management system
07.04 IT 
Take forward IT
strategic
developments
Develop and deliver training plan to upskill IT
staff in new technologies
07.04 IT  
Take forward IT
strategic
developments
Migrate to new Social Work Information system 07.04 IT  
Take forward IT
strategic
developments
Migrate all analogue telephony services to
technology to align with Ofcom 2025 switch off
07.04 IT 
Take forward IT
strategic
developments
Develop and deliver proof of value business
case for the use of artificial intelligence within
the council
07.04 IT 
Take forward IT
strategic
developments
Develop and support delivery of cross-resource
Digital Transformation programme
07.04 IT 
Resource Outcome: The workforce has the skills, flexibility, and capacity to deliver the council’s
priorities 
Action Milestones/Steps we will take to deliver our
actions
Links Service
11. Montor progress on
actions associated
with Strategic
Workforce Plans
Report progress on Strategic Workforce Plans to
Committee on an annual basis
07.03 Personnel
80

Page 81

Section Five – Resourcing the Plan 
5.0. Introduction
In this section we consider the resources needed to implement our plan, including funding and
staffing. 
5.1. Revenue Budget 2025-26
The Resource has a Net Revenue Budget of £39.797 million. The table below allocates this budget
across the services: 
Net Budget by Service 2025-26 £ million %
Finance Services (Transactions) 17.359 44
Finance Services (Strategy)  2.063 5
Information Technology Services 7.460 19
Administration, Legal and Licensing Services 3.798 9
Communications and Strategy (incl Community and
Engagement and Research and Improvement) 2.257 6
Personnel Services 6.521 16
Internal Audit 0.339 1
Total 39.797 100 
5.2. Capital Budget 2025-26
The following capital budget of £0.300 million is allocated: 
Capital Programme 2025-26 Project £ million
IT Infrastructure – Business As Usual 0.300
Total 0.300 
5.3. Resource Employees
Finance and Corporate Resources has 831 employees as at February 2025.  We support these
employees to deliver their duties through a range of policies including personal appraisal and a
robust training framework. 
81

Page 82

The number of employees by service is as follows: 
Service Number of employees 
Finance Services (Transactions) 397
Finance Services (Strategy) 57
Information Technology Services 95
Administration and Legal Services 75
Communications and Strategy 31
Personnel Services 165
Internal Audit 11
Total 831 
If you need this information in another language or format, please contact us to discuss how we can
best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk
82

Page 83

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Collection and Approval for Write Offs 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise Committee of Revenue Collection performance for financial year
2024/2025 to 31 March 2025
 advise Committee of the position regarding the Non-Domestic Rates
Incentivisation Scheme (NDRIS) for financial year 2024/2025 
 seek approval for write offs 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that performance in the collection of revenue be noted;
(2) that the current position in respect of NDRIS be noted; and
(3) that write offs for the following be approved:-
 Council Tax  £1,631,922.33
 Non-Domestic Rates £168,511.50
 BID Levy £2,001.15
 Sundry Debt  £240,306.89
 Housing Rent and associated charges £272,592.94
 School Meals Debt                                               £107,000.00  
3. Background
3.1. Responsibility for the collection of Council Tax, Non-Domestic Rates (NDR) and
Sundry Debt is the responsibility of Finance and Corporate Resources.  This report
and the attached appendix provide information on collection performance and
proposals for write off. 
4. Current Collection Performance
4.1. The first table in Appendix 1 presents the collection performance for Council Tax,
NDR and Sundry Debts for financial year 2024/2025. 
4.2. The annual Council Tax collection target for 2024/2025 was set at 95.5%.  A Council
Tax collection rate of 95.69% was achieved, ahead of target by 0.19% and behind
comparable performance in 2023/2024 by 0.01%. 
9
83

Page 84

4.3. Council Tax performance is reported nationally on a line by line basis, which adjusts
for the impact of Scottish Water billing and collection.  For information, the equivalent
level of Council Tax collection for 2024/2025 when Scottish Water debts are
removed is 96.39%. 
4.4. A Non-Domestic Rates (NDR) collection target of 97.5% was set for 2024/2025. 
NDR collection of 98.4% was achieved, ahead of target by 0.9% and ahead of
comparable performance in 2023/2024 by 0.7%. 
4.5. The 2024/2025 annual target for Sundry Debt collection was set at 97.5%.  A Sundry
Debt collection of 98.2% was achieved, ahead of target by 0.7% and ahead of
comparable performance in 2023/2024 by 1.3%. 
5. Arrears Collection Performance
5.1. Arrears collection performance for Council Tax, NDR and Sundry Debt is presented
in the second table of Appendix 1. 
5.2. The 2024/2025 arrears annual target for Council Tax was set at £3.000 million, with
collection of £3.888 million, ahead of target by £0.888 million (29.6%) and ahead of
comparable performance in 2023/2024 by £0.500 million. 
5.3. The 2024/2025 arrears target for NDR was set at £2.000 million, with collection of
£3.632 million, ahead of target by £1.632 million (81.6%) and ahead of comparable
performance in 2023/2024 by £1.120 million. 
5.4. The 2024/2025 arrears target for Sundry Debt was set at £10.153 million, with
collection of £8.360 million, behind target by £1.793 million and behind comparable
performance in 2023/2024 by £1.176 million. 
6. Non-Domestic Rates Incentivisation Scheme
6.1. The Non-Domestic Rates Incentivisation Scheme (NDRIS), formally known as the
Business Rates Incentivisation Scheme is a Scottish Government initiative to
incentivise growth of the local business tax base, with a view to increasing NDR
income yields. 
6.2. The Scottish Government sets annual targets for growth (buoyancy) and Councils
who achieve their target retain 50% of the additional income generated above the
target.  The buoyancy target is a measure of the increase in the total rateable value
of the non-domestic properties on the Valuation Roll (including certain categories of
public undertakings). 
6.3. The annual buoyancy target for South Lanarkshire Council in 2024/2025 was set by
the Scottish Government at 0.9%.  This is a measure of the increase in the total
rateable value of the non-domestic properties on the Valuation Roll (including certain
categories of public undertakings). 
6.4. Buoyancy for 2024/2025 was 1.09%.  The tax base has therefore exceeded the final
target by 0.19%, which should result in the securing of additional income under the
scheme of approximately £0.106 million in relation to 2024/2025.  Scottish
Government will confirm the value before payment is made to the Council and this
can take some time based on previous experience.  
84

Page 85

7. Proposals for Write Off
7.1. Approval for write off of the following irrecoverable debts is requested from
Committee.  The Council has the power to write off accounts where the debtor is
deceased, sequestrated, in liquidation or the debt is prescribed or where the debt is
deemed uneconomical to pursue. 
7.2. The proposed write off of Council Tax accounts dating from 1993/1994 to 2024/2025
totals £1,631,922.33 relating mainly to prescribed debt, sequestrations and estates
of the deceased.  This includes the bulk write off of prescribed debt for financial year
2001/2002. 
7.3. The value of accounts currently marked for write off in the Non-Domestic Rates
system from rating years 2023/2024 to 2025/2026 totals £168,511.50.  These debts
are deemed to be irrecoverable because the debtor is in liquidation, has ceased
trading or has been sequestrated. 
7.4. Approval is sought for the write off of Business Improvement District (BID) Levies
totalling £2,001.15, administered by the Council on behalf of the Hamilton, Carluke
and Lanark BID companies.  There is no financial impact on the Council for these
write offs. 
7.5. Following consultation and agreement with Resources, the proposed write off of
Sundry Debt totals £240,306.89.  Appendix 2 provides a breakdown of the proposed
write-off over categories. 
7.6. Approval is sought for the write off of former tenant rent arrears of £272,327.44 and
factoring arrears of £265.50. 
7.7 Committee approval is sought to write off £107,000 of school meal debt funded by
£224,000 of Scottish Government grant for this purpose.  The remaining funding was
used to cover debts already written off around school meal debt. 
7.8. A full list of all debts proposed for write off is held by the Executive Director (Finance
and Corporate Resources). 
8. Employee Implications
8.1. None. 
9. Financial Implications
9.1. Provision has been made for the financial impact of all write offs. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
11. Other Implications
11.1. The main risk associated with the Council’s revenue collection is a failure to monitor
collection rates and take effective corrective action where required, resulting in a
significant reduction in collection performance and Council funding.  The risk is
managed through monthly performance reporting and review of performance at
monthly Senior Management Meetings. 
11.2. There are no implications for sustainability in terms of the information contained in
this report. 
85

Page 86

12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
12.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
21 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Finance and Corporate Resources Committee – 26 March 2025 
List of Background Papers
 System Reports from Council Tax, Non-Domestic Rates, Sundry Debt and Academy
Housing 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
86

Page 87

Appendix 1        
SOUTH LANARKSHIRE COUNCIL        
REVENUES COLLECTION        
FOR PERIOD ENDING 31 MARCH 2025         
Annual Budget           
Cash Target  Actual Variance   % Variance   
Budget to 31/03/25 to 31/03/25 to 31/03/25   to  Notes 
£000's £000's £000's £000's    annual budget          
FINANCIAL YEAR 2024/2025       
Council Tax 156,358  156,358  156,662  304 over 0.19% 
Non-Domestic Rates 384,595     384,595     388,219       3,624 over 0.9% 
Sundry Debt 117,921  117,921  118,738  817 over 0.7% 
ARREARS        
Council Tax 3,000  3,000 3,888 888 over  29.6% 
Non-Domestic Rates 2,000    2,000  3,632      1,632 over 81.6% 
Sundry Debt       10,153       10,153       8,360      (1,793)       under         -17.7% 
87

Page 88

Appendix 2 
BREAKDOWN OF PROPOSED
SUNDRY DEBT WRITE-OFF 
Resource Service No. of Accounts Value (£)
Housing & Technical Housing Support Services / H&T
General
20                 10,014.26 
Rechargeable Repairs / Capital
Repairs
391               210,055.55
Community and Enterprise Bereavement / Care of Gardens /
Grounds / Waste
17                 14,018.64
Education Education General 4    2,404.83
Finance & Corporate/Social Work Housing Benefit Overpayments /
Sundry Income / Social Work General 
3    3,813.61 
Total 435 240,306.89 
88

Page 89

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Report: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)    
Subject:  2025/2026 Information and Communication Technology 
(ICT) Asset Management Plan 
c
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Finance and Corporate Resources Committee on the outcomes of the
2024/2025 Information and Communication Technology (ICT) Asset Management
Plan
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted; and 
(2) that the ICT Asset Management Plan for 2025/2026 be approved. 
3.  Background 
3.1. The Council is required to develop Asset Plans across a number of service areas, in
line with CiPFA guidance, and is summarised under an overarching Corporate Asset
Management Plan.  This demonstrates how each area supports corporate objectives. 
The Service Areas are Property, Housing, ICT, Roads Infrastructure and Fleet. 
3.2. The ICT Asset Management Plan aims to put in place effective ICT asset management
processes which enable high quality ICT services to be provided to meet the needs of
the Council. 
4.  Summary Position
4.1. The ICT Asset Management Plan for 2025/2026 included in Appendix 1 outlines
several key initiatives and projects aimed at maintaining and enhancing the
Council's ICT infrastructure.  Based on the current assessment, the following
summary position is provided. 
4.2. Section 3.2 of the plan provides that the overall status is that the majority of ICT
assets are in good condition and meet the Council's objectives.  However, there are
several assets classified as "Red" or "Amber" that require attention.  Plans are in
place for these assets with more information provided in Section 5.2. 
4.3. Funding is in place for essential infrastructure projects and several application
refresh projects for 2025/26.  Funding for some application refresh, Digital
Transformation, and Customer Engagement projects will require further
consideration in the medium term. 
10
89

Page 90

4.4. Risk areas have been identified, including legacy software versions, end-of-life
hardware, and critical network components that require replacement or upgrades. 
These areas are detailed in the plan in section 6.1 of the plan and will be closely
monitored to ensure timely resolution. 
5. Outcomes of the 2025/2026 ICT Asset Management Plan 
5.1. The ICT Asset Management Plan outlines the priorities and strategies required to
develop and support the ICT asset estate which is in place to support the business
objectives of the Council whilst ensuring business and service continuity.  The plan
highlights the key actions planned for the year ahead, ensuring that the Council’s ICT
Assets are fit for purpose.   
5.2. The key areas of activity for red and amber rated assets, summarising section 5.2.1
and 5.2.2 of the plan, are below:- 
 a major programme of server upgrades will continue to maintain performance and
security levels
 the remaining existing major programmes will see two business applications
replaced for LiquidLogic for Social Work and Home for Housing
 continuing programme of work to upgrade or replace legacy applications across
Resources
 cross-cutting reviews for Digital Transformation and Customer Engagement are
underway during 2025/26 which will see us consider the Council website and
Customer Relationship Management (CRM system)
 ongoing upgrades to the Council’s data network will include the replacement of
regional chassis switches which are nearing end of life.  This is an ongoing annual
activity across the network estate as equipment has finite support and operational
lives
 a major programme of work began in 2024/2025 to replace analogue telephony
systems in advance of Ofcom deadlines.  This programme will continue to run until
the end of 2025. 
5.3. The key actions, as detailed in section 6 of the plan, can be summarised as follows:- 
 Upgrade legacy software versions: This involves updating software versions that
have reached the end of their lifecycle to ensure continued support and
functionality.
 Replace legacy servers: This action focuses on replacing servers that are no
longer supported to maintain system reliability and performance.
 Rollout Windows 11: This entails upgrading desktop equipment from Windows 10
to Windows 11 to comply with security mandates and enhance user experience.
 Replace remaining analogue lines: This involves replacing analogue lines with
digital ones in line with the Digital changeover 2025 to ensure continued service.
 Renew Meraki software licence: This action is about renewing the Meraki software
licence to maintain Wi-Fi services.
 Replace smartphones no longer under support: This entails refreshing
smartphones that are no longer supported to ensure they can receive the latest
operating system and security patches.  
90

Page 91

6.  Employee Implications 
6.1. There are no employee implications.  
7.   Financial Implications
7.1. Funding is in place for essential infrastructure projects and several application refresh
projects for 2025/2026.  Funding for some application refresh, Digital Transformation,
and Customer Engagement projects will require further consideration in the medium
term. 
7.2. Specific applications that need to be refreshed or replaced include those currently in-
progress including Capita Academy Housing and SWISPlus Social Work System have
funding in place. 
7.3. Any further funding for programmes will be considered through existing resource
budgets or capital programmes. 
8.   Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change or sustainability in terms of the
information contained in this report. 
9. Other Implications
9.1. There are no significant issues in terms of risk. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.  
10.2. The statutory Consultation Authorities have confirmed that the Asset Management
Plan is exempt from Strategic Environmental Assessment as its implementation will
have minimal effect in relation to the environment. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
21 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers 
 None 
91

Page 92

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Murray Husband, Head of Information Technology  
Ext:  5648 (Tel: 01698 455648) 
E-mail: murray.husband@southlanarkshire.gov.uk 
92

Page 93

Finance and Corporate Resources 
South Lanarkshire Council 
Information and Communication
Technology  
Asset Management Plan
2025/2026 
10
93

Page 94

1. Introduction and contextual statement 
1.1 Information Technology Services within Finance and Corporate Resources employs 96
FTE staff and administers a controllable annual budget of £7.75 million. 
Information Technology Services operate as a centralised Information and
Communication Technology (ICT) service provider for the Council, coordinating and
delivering a wide range of services.  These include the support and maintenance of PCs
and servers, running business applications for all departments including schools.  This
delivery is supported by Council wide networks including fixed and mobile telephony,
electronic mail, training, and all internet services.  
Information Technology has a significant role to play in enabling efficient and effective
services throughout the Council.  In addition to supporting and enabling the Council’s
values and objectives, the IT Service will be a key enabler of business transformation
through consolidation of information systems and provision of ICT that provides cost
benefit to the Council in the longer term. 
Technology Services design, manage, implement, and secure all of the Council’s
hardware investments, including personal computers, associated servers and backup
and recovery functions.  In addition, the section facilitates availability of the Council’s
Mail and Internet Services whilst ensuring that the voice and data networks are in place
to support all the Council’s business. 
The IT Business Project Managers and teams are responsible for planning, managing
and effectively and efficiently delivering a range of IT projects and programmes.  Whilst
projects vary in both size and complexity, they will deliver positive business outcomes
and transformational change for the Council.  These projects are defined and prioritised
in the ICT Service Plan 2025/26.  These teams are also responsible for the day-to-day
support and maintenance of the Council’s business IT systems.  This includes the
management and resolution of issues, the implementation of requests and minor
enhancements and the performance of routine monitoring and maintenance tasks.   
IT Service Delivery provide day-to-day service provision to IT Services and supply business
management and process control functions.  Services provided are the IT Service Centre,
IT Support Team, National Entitlement Card Team, and IT Security. 
94

Page 95

1.2 CMT and Executive Committee approved the development of an extended model for
Corporate Asset Management.  This included developing asset plans across a number
of service areas, in line with CiPFA guidance, and summarised, under an overarching
Corporate Asset Management Plan, which demonstrates how each area supports
corporate objectives.  The service areas are Property, Housing, Roads Infrastructure,
Fleet and ICT:- 
1.3 Aims of the ICT Asset Management Plan are:
• To create an effective ICT asset management process
• To modernise working practices and improve service quality
• To effectively manage and maintain all the Council’s ICT assets. 
Corporate Asset
Management
Plan
Property Asset
Management
Plan
Housing Asset
Management
Plan
Roads Asset
Management
Plan
Fleet Asset
Management
Plan
ICT Asset
Management
Plan
95

Page 96

2. Strategic objectives and priorities 
2.1 Link to Finance and Corporate Resource Plan outcomes 
The ICT Asset Management Plan feeds into the Resource outcomes of the Finance and
Corporate Resource plan. 
Resource outcome – Digital and ICT services meet the needs of the council and its
customers
Actions: 
• Migrate to new Integrated Housing and Property Management system
• Develop and deliver training plan to upskill IT staff in new technologies
• Migrate to new Social Work Information system
• Migrate all analogue telephony services to technology to align with Ofcom 2025
switch off
• Migrate to new Fusion platform, Oracle’s cloud-based Human Resources (HR)
and Finance solution. 
2.2 Links to 2025/2026 Council ICT priorities 
In aligning the Digital Strategy 2022-2027, operational service delivery and in turn ICT
assets to the objectives of the Council, it is important to consider the following: 
• The needs of service users to access and receive services in different ways
(channels).
• Develop the right blend of channels for digital, mobile and electronic service
delivery.
• Maximise availability of information and technology to include as many customers
as possible.  
It is therefore essential to maintain the current ICT asset estate which is in place to
support the business objectives of our customers whilst maintaining a robust solution for
business continuity through a disaster recovery strategy. 
Objectives and strategies should reflect the needs of users for receiving services
through different channels and to address the demands of Local Government in a public
sector environment where both capital and revenue funding is reducing.   
Therefore, future investment in ICT assets will be challenged by the IT Senior
Management Team, the ICT Programme Board, and the Corporate Management Team
to meet the following criteria: 
• Investment in ICT assets will be closely aligned to council priorities.
• Investment in ICT assets will be sufficient to support statutory requirements. 
2.3 Links to sustainability objectives 
2.3.1 Sustainable Development and Climate Change Strategy 2022-2027 
The strategic vision and mission statement is:
Our Future is Now: building a sustainable, climate resilient and net-zero South
Lanarkshire together, in a fair and inclusive way.
96

Page 97

‘Our Future is Now’ mirrors the 2019 UN Sustainable Development Goals report on
collaborative action with respect to achieving sustainable development goals.
From the issues that were discussed during the public engagement, there are four key
themes that emerged.  These themes align with the themes of the Council Plan: People,
Place, Planet 
• People
• Place and Communities
• The Natural Environment (Planet)
• A Green Economy (Planet) 
IT Services have focussed particularly on improving effective use of energy in our
buildings, using our equipment more efficiently and increasing recycling.  Also, ICT
equipment that has come to end of life is disposed/recycled by an approved supplier who
disposes of the equipment following the Waste Electrical and Electronic Equipment
Regulations (WEEE) and provides a confirmation of disposal certificate.  
Migration of council servers and storage from Caird datacentre to external supplier
(Datavita), as well as providing operational benefits, has delivered significant
environmental benefits as new datacentre is state-of-the-art with lower energy
consumption. 
IT have enabled agile working, thereby reducing transport emissions from commute and
business travel, and supporting new ways of working following the pandemic. 
2.3.2 The Council’s Environmental and Sustainable Procurement Policy ensures the process
of purchasing goods and services take into account the social, economic and
environmental impacts that such purchasing has on people and communities.  It is about
considering what products are made of, where they have come from, who has made
them, how are they transported and how they are eventually disposed of.  It may even
be about whether the purchase requires to be made at all.  In addition to this the
tendering process for IT contracts contains contract specific environmental questions in
relation to equipment manufacturing, components, recycled content, packaging,
transportation, disposal, and energy consumption. 
2.4 ICT asset management objectives
Aims and objectives that will seek to ensure that the Council’s ICT assets are fit for
purpose within current financial constraints.
− ICT assets should meet the needs of those that use them including staff, elected
members, pupils, visitors, customers and the general public through the different
access channels.
− ICT assets must be safe, secure and comply with current legislative and statutory
requirements, for example assets must meet the level of security accreditation
required by PSN, as well as DSE assessments for users, PAT testing of all electrical
ICT assets, compliance with WEEE regulations for disposal of electrical ICT assets,
to name a few.
− ICT assets should be environmentally sustainable, meaning the effective and efficient
use of assets to reduce energy consumption and in turn CO2 emissions.
− Maximise use of existing ICT assets where possible.  Where asset acquisition is
necessary there is a robust business case supporting procurement of the asset and
where possible a single corporate solution. 
97

Page 98

3. Current position
3.1 What assets do we have?
3.1.1 ICT assets:     
Asset type Quantity
Desktop and server: 
Servers (Physical and Virtual) 260
Servers (Curricular) 57
Monitors 5859
PCs 493
PCs (Curricular) 6473
Monitors (Curricular) 6473
Laptops 4882
Laptops (Curricular) 2909
Tablets 460
Tablets (Curricular) 3200
Port Replicators 2225
Portable Devices (Curricular) 14746  
Networks and communications:  
Comms (ACI) APIC server 9
Comms (ACI) switches 40
Comms (ACI) Licence 1
Comms FMC 2
Comms Firewall 12
Comms Load Balancers 4
Voice SIP Gateway (cubes) 2
Meraki SDWAN Software Licence 1
Meraki Wireless Software 1
Comms Wireless (Access Points) 322
Comms Wireless (Security Appliance) 2
Comms SDWAN (Security Appliance) 2
Switches - Chassis 8
Switches – Ethernet L2 301
Switches – Ethernet L3 82
Switches – SDWAN & Corporate 18
Routers (SDWAN) 56
Routers (IPVPN Broadband) 2
Lines (Exchange) 1146
Lines (Private Circuits) 85
Lines (IPVPN broadband - including backhaul) 3
Lines (SDWAN) 53
Guest Internet Service 1
Guest Internet Licence 1
NetConnect Appliances 2
Network Management 4
Radius Security Appliance 2
Web Filtering Appliances 2
Telephone System – Small 138
Telephone System – IP 3
Telephone System – SIP  2
Telephone System – Softphone  3
Smartphones 5130
Basic Mobile Handsets 1319  
Data hubs: 
Air Conditioning Units 2
98

Page 99

Fire Suppression System 1
UPS 2
Generator 1
Rack UPS – Brandongate 2  
Networks and Communications (Curricular): 
Wireless Access Points  2876
Routers 196
Lines - Circuits 196
Switch L2 637
Switch L3 62
Switch L4 2
Core router 2
Firewall 2
Backhaul circuit 2
Audio Visual Equipment Curricular) 
Interactive teaching display screens 1250
Data Projectors 1250  
Software: 
P1 Applications 147 
3.2 How well are they meeting objectives? 
All ICT assets have been implemented/installed following business requirements and
justification exercises to ensure they meet the needs and objectives of the organisation. 
As the information technology environment continuously changes it is inevitable that
some ICT assets will reach end of life and become obsolete. 
Software and hardware assets are continually reviewed to ensure they remain fit for
purpose.  Specific product versions are monitored, and we work closely with our
software and hardware partners on product roadmaps to ensure they remain at a
supported level. 
Where products are approaching end of life, we will develop proposals for continued use
based on risk assessment, upgrade or replacement as appropriate. 
At present the majority of ICT assets meet the objectives of the organisation with a
minority of assets at end of life and in need of replacement. 
99

Page 100

4.  Performance core facts 
Notes to tables below – core facts are categorised using a traffic light system which
operates on the basis of:   
Green – Good or excellent 
Amber – Fair 
Red  – Poor 
4.1 Desktop 
IT desktop hardware  
Asset condition
Type  Total Green Amber Red
PC 493 129  364
PC (Curricular)  6473 6473 - -
Monitor 5859 5859 - -
Monitor (Curricular) 6473 6473  
Laptop 4882 2230 - 2652
Laptop (Curricular) 2909 2909 - -
Tablets 460 460 - -
Port Replicator 2225 2225 - -
Portable Devices (Curricular) 14746 14746 - -
Interactive teaching display
screens (Curricular) 1250 550 550 50
Data Projectors (Curricular)   200 1050 
4.2 Server (Physical and Virtual) 
Server 
Asset condition
Type  Total Green Amber Red
Server 260 105 53 102
Server (Curricular) 57 57 - -
Citrix Remote Apps 1 - 1 -
Citrix (NDL) 1 - - 1 
4.3 Networks and communications 
Networks and communications  
Asset condition
Type  Total Green Amber Red
ACI APIC/NDO server 9 - 9 -
ACI switches  40 - 40 -
ACI Licencing 1 - 1 -
Firewall Mgmt (FMC) 2 - 2 -
Firewalls 12 12 - -
Load Balancers 4 4 - -
Voice SIP Gateway (Cubes) 2 2 - -
Meraki Wireless Software (Corporate,
not SLLCT or SWR)
1 - - 1 
100

Page 101

Meraki SDWAN Software Licence 1 - 1 -
Comms wireless Access Points
(Corporate)
322 322 - -
Comms wireless Security Appliances
(corporate)
2 2 - -
Comms SDWAN (Security Appliance) 2 2 - -
Switches – Chassis  8 - - 8
Switches – L2  301 196 105 -
Switches – L3 82 60 22 
Switches – SDWAN & Corporate 18 18 - -
Routers - SDWAN 56 56 - -
Routers – IPVPN Broadband 2 - - 2
Lines – Exchange  1146 410 - 736
Lines – Private Circuits 85 85 - -
Lines – IPVPN Broadband (including
backhaul)
3 - - 3
Lines - SDWAN 53 53 - -
Guest Internet Service 1 - 1 -
Guest Internet Licence 1 - 1 -
NetConnect Appliances 2 - - 2
Network Management 4 4 - -
Radius Security Appliances 2 - 2 -
Web Filtering Appliances 2 - - 2
Telephone System – Small  138 77 61 -
Telephone system – IP 3 - 3 -
Telephone system – SIP  2 2 - -
Telephone system – Softphone  3 - 3 -
Smartphones 5130 1655 1627 1848
Basic Mobile Handsets 1319 1319 - -
Networks and Communications
(Curricular):    
Wireless Access Points  2876 2876 - -
Routers 196 196 - -
Lines - Circuits 196 196 - -
Switch L2 637 637 - -
Switch L3 62 62 - -
Switch L4 2 2 - -
Core router 2 2 - -
Firewall 2 2 - -
Backhaul circuit 2 2 - -
101

Page 102

4.4 Software applications 
Software applications  
Asset condition
Type  Total Green Amber Red
IT Applications 144 113 5 26 
4.5 Data Hubs 
Almada Data Hub  
Asset condition
Type  Total Green Amber Red
Air Conditioning Units 2 2 - -
Fire Suppression
System
1 1 - -
UPS 2 - 2 -
Generator 1 1 - -
Rack UPS – Data Hubs 2 -  2
102

Page 103

5. Review of current performance 
5.1 Summary 
The majority of ICT assets are of a good standard (Green) and work efficiently and
effectively.     
All desktop assets and server assets are supported and maintained to a high standard
as part of the ‘ICT Desktop Equipment’ and ‘Cloud Hosting’ contracts.   
Desktop and server hardware information along with information on smart devices is
captured in the Assyst Configuration Management Database which is managed by IT
Services. 
Overall, there is a high level of confidence and reliability in the ICT assets. 
5.2 What issues have been highlighted?
5.2.1 Red – These assets have been classified as approaching end of life and require
replacement or upgraded to supported versions: 
Legacy software versions – 
Application Reason
Capita Academy Housing No longer supported by supplier. 
Project Underway to replace.  Go live
planned for mid 2025.
Oracle Customer Relationship
Management
Current version no longer fully supported.
Replacement or upgrade to be considered
through Digital Transformation and Customer
Engagement reviews.
SWISPlus Social Work System No longer meets business needs. 
Project well underway to replace.  Go live
planned for Summer 2025.
Civica Flare Project underway to replace however Flare
remains under support.  No current go live
data due to supplier delivery issues.
Causeway CPA Linked to Exor replacement.
Interface to CPA switched from EXOR to
HIAMS from 1st April 2025 following Go Live
of HIAMS.
SEEMIS Click+Go Being replaced by new SEEMIS Schools &
Early Years systems, date unknown and
decided externally.
Council Website An upgrade of the underlying technology is
being prepared to support Digital
Transformation and Customer Engagement
reviews, including content reviews.  This will
take place during 2025/26.
EDRMS - Civica W360 Upgrade underway.
Oracle Discoverer (CRM) End of life.  Current within scope of the
Customer Engagement review and may be
replaced or upgraded as a result during
2025/26
Legal Case Management Implementation underway to new system
103

Page 104

Application Reason
IMPROVE – Performance
Management
Project underway to replace.
Currently using old application technology,
with little scope to migrate to newer server
technology.
GLAMIS Licensing and
Registration
Support ended in 2024 and has been
extended to provide time to procure and
implement alternative.
Assyst Current version not suitable for deployment of
self-service.  Upgrade or replacement
required and project underway.
Capita Housing Online Will be replaced by new Housing
Management System.
eConsol Will be replaced by new Housing
Management System.
eConsol Mobile Will be replaced by new Housing
Management System.
Arbitas (Hosted) Will be replaced by new Housing
Management System.
Infoprop Content Will be replaced by new Housing
Management System.
Yardi Project underway to replace which will be
completed in 2025.
Servitor No longer supported - Will be replaced by
new Housing Management System.
APEX Case Management Will be replaced by new Housing
Management System.
Data Tracking (HIP) Will be replaced by new Housing
Management System.
Codeman No longer supported - Will be replaced by
new Housing Management System.
Omnidox Limited support - Will be replaced by new
Housing Management System.
Customer looking at getting all data archived
from this server.  Once complete, server can
be decommissioned.
Gladstone Plus2 – Leisure
Management System
Scoping exercise is currently underway with
intention to go to market for replacement
system in Q2 2025/26.
Artifax – Corporate and
Theatre Management System
Project to migrate to latest version, which is
hosted in the cloud is currently underway. 
The UK and Scottish Government security agencies mandate that public sector PCs and
laptops must be capable of receiving the latest operating system and security patches. 
The Council makes use of the Microsoft Windows 10 enterprise operating system which
goes ‘end of support’ on 14 October 2025.  After this operating system and patching
updates are no longer available and all existing corporate and curricular PCs and laptops
must have been refreshed or upgraded to Microsoft Windows 11 Enterprise. 
There are 102 servers running out of support operating systems of which there are 39
co-location servers whose hardware is no longer supported and should be replaced. 
Programmes of work are in place to replace these systems in 2025/26. 
Netconnect - Solution which allows external supplier access to support applications is
104

Page 105

out of support and requires to be upgraded.  The replacement/upgrade of our current
VPN solution will be added as a project within the service plan. 
Citrix NDL –The Citrix virtual apps and desktop running the NDL application is out of
maintenance & support and requires to be replaced.  The replacement/upgrade of the
Citrix solution will be part of the project to replace the NDL solution. 
The Web Filtering appliances went out of maintenance in October 2023.  The systems
are currently being migrated from the current ‘on-premises’ appliances to the equivalent
cloud service to maintain support.   
Hardware support for 8 x regional chassis switches ends in October 2025.  The chassis
control access to IT systems from regional council offices.  Failure of a chassis results in
loss of connection to Council offices in regional area affected and reduced resiliency to
other areas.  1 chassis has already been replaced with 7 chassis switches to be
replaced in 2025/26. 
Circuits & Routers – IPVPN Broadband. 2 routers are end of support June 2025.  We are
waiting digital services to be available to complete the remaining 2 sites. 
The Meraki wireless software support needs to be renewed in 2025 or access to Wi-Fi
services stop immediately after the support runs out.  Replacement is required for
2025/26. 
Telephone exchange lines (PSTN) - The Council has 736 analogue PSTN lines,
including alarm, lift, fire, connections to schools that will need to be upgraded for the
Digital Changeover by December 2025.  We have a confirmed 277 to migrate and await
confirmation from relevant Resources if the 459 can be ceased or require transition. 
Brandongate data hub room core network equipment requires UPS support to keep the
network fabric under support.  The UPS is end of support April 2026. 
The Council’s main data hub is in Council Offices, Almada Street, Hamilton.  In the event
of a power cut, the Uninterruptable Power Supply maintains power until the generator
kicks in.  The UPS requires a battery replacement and overhaul in 2025/26. 
The Council’s main VOIP telephone System will require a software upgrade by April
2026.  The softphone servers will require a software upgrade by April 2026. 
The UK and Scottish Government security agencies mandate that public sector
smartphones must be capable of receiving the latest operating system and security
patches.  The Council makes use of Samsung android smartphones where each model
is supported for a period of 3 years.  After this operating system and patching updates
are no longer available and the smartphones require to be refreshed.  1,848 corporate
smartphones will require to be refreshed in 2025-26. 
All red assets identified in these sections have plans in place to address or mitigate
during 2025/26 
5.2.2 Amber – This classification denotes assets that are of a fair condition and should be
considered for upgrade, or are processes which require improvement: 
There are currently 53 servers which will require either OS or hardware upgrades by
2028.  Of these, 14 require hardware and software replacement and 40 require OS
upgrades only.
105

Page 106

Citrix Remote Apps –The Citrix remote apps environment goes end of life in March 2027
and requires to be replaced/upgraded.  The most suitable replacement/upgrade solution
will be determined in 2025/26. 
The Cisco ACI network (including ACI switches and APIC servers) provides the
Council’s core connectivity between the Council data hubs in Almada & Brandongate
and the Datavita data centres in Chapelhall & Edinburgh.  Equipment support is tied to
the current Cloud Hosting contract which is due to end in September 2027.  Any new
contract for data centre services will require a refresh of all ACI equipment. 
In advance of any ACI equipment renewal, the ACI licence expires September 2026, and
requires to be renewed to maintain connectivity to Council IT applications in the Datavita
datacentre and Internet. 
Firewall Management consoles provide administration of the Council firewalls, Gov,
Internal, Guest and SIP.  They go end of life in 2026/27.  The consoles need to be
replaced to ensure the firewalls continue to provide secure access to the Council’s IT
applications. 
Layer 2 switches – These switches provide end user device (printer, PCs, CCTV, VoIP
phones, wireless access points) connectivity to the corporate network.  The
manufacturer has announced that several layer 2 switches are end of hardware support.
113 layer 2 switches require to be replaced October 2027. 
Layer 3 switches and routers – These switches provide network connectivity for many of
the outlying offices on the Council’s corporate data network.  22 layer 3 switching
devices are end of life October 2026.  It is important that these devices are refreshed to
maintain the current reliability and support levels. 
Cisco ISE (RADIUS) are security appliances which authenticate users/devices onto
corporate Wi-Fi, AOVPN remote access and administrators for access to network
devices such firewalls/routers/switches for management.  The appliances require a
software update to extend support to September 2026. 
The Guest Internet Service circuit provides wi-fi internet service for guest, partner,
MDMD service users.  The current contract runs out in September 2027 and must be
renewed to continue service. 
The current Meraki SDWAN software support needs to be renewed by December 2026
or access to the 57 sites connected using this technology will cease immediately. 
Small Telephone Systems provide telephony to small Council sites.  Due to
manufacturer end of life support 61 require to be replaced in 2027/28. 
The UK and Scottish Government security agencies mandate that public sector
smartphones must be capable of receiving the latest operating system and security
patches.  The Council makes use of Samsung android smartphones where each model
is supported for a period of 3 years.  After this operating system and patching updates
are no longer available and the smartphones require to be refreshed.  1,627 corporate
smartphones will require to be refreshed in 2026-27 & 2027-28. 
The IT network infrastructure linking Council premises to HFD Datavita Ltd datacentres
is due for replacement in 2028/29.  Funding will be required to pay for hardware and
professional services to replace the existing network infrastructure on Council premises.
106

Page 107

Any future cloud services contract will have to cover the cost of new network
infrastructure at the supplier’s datacentre. 
Legacy software versions – 
Application Reason
Council Intranet Moved to AWS but required patching is
taking place and new versions of CMS &
Forms available.
Funding Compliance and
Project Monitoring
APEX system requires upgrades to support
monitoring/reporting.
QPulse Replacement or upgrade to be considered.
Problematic from a support perspective.
Galaxy websites – various Moved to AWS but required patching to take
place and new versions of CMS available.
Community Grants Runs on legacy database platform.
Replacement or upgrade to be considered. 
Consultation with users of these systems is underway to plan the activity.
107

Page 108

6. What action is required / proposed? 
6.1 Action plan 2025/26 
Asset objective Action Owner Timescale Comment
Legacy software
versions
Upgrading of software versions which
have become end of life. 
Head of IT Services 2025/26 IT Services and application
provider to schedule refresh of
software.
Replace legacy
servers 
Replacement of servers which have
become end of life. 
Head of IT Services 2025/26 Refresh of equipment is being
scheduled. 
Replace legacy
servers
Replacement of servers no longer
under support 
Head of IT Services 2025/26 Refresh of equipment is being
scheduled.
Windows 11 rollout Upgrade of desktop equipment
running Windows 10 
Technology Services
Manager
2025/26 Upgrade of equipment is being
scheduled. 
Routers – IPVPN
Broadband (including
backhaul)
Replacement of existing analogue
lines in conjunction with Digital
changeover 2025.
Technology Services
Manager
2025/26 Refresh of lines scheduled for
completion no later than June
2025
Lines Exchange
(PSTN)
Replacement of existing analogue
lines in conjunction with Digital
changeover 2025.
Technology Services
Manager
2025/26 Refresh of lines scheduled for
completion no later than
December 2025
Corporate Web
Filtering Software
Replacement of hardware & software
which has become end of life. 
Technology Services
Manager
2025/26 Decommissioning of on-premises
appliances is being scheduled
Regional Chassis
Switches
Hardware is end of life.  Review
specification, procure and install
refreshed hardware. 
Technology Services
Manager 
2025/26 Refresh of equipment is being
scheduled 
NetConnect Hardware and software are end of
life.  Review specification, procure
and install refreshed hardware. 
Technology Services
Manager 
2025/26 Refresh of equipment is being
scheduled
Citrix (NDL) Solution is end of life and not
supported. 
Technology Services
Manager
2025/26 Alternative solution being
investigated
Meraki Wireless
Software (Corporate)
Renewal of Meraki software licence Technology Services
Manager
2025/26 Refresh of licence is being
scheduled
108

Page 109

Smartphones Replacement of Smartphones no
longer under support 
Technology Services
Manager 
2025/26 Refresh of equipment is being
scheduled 
6.2 Completed actions in 2024/25. 
Asset objective Action Owner Timescale Comment
Telephone
systems (Small)
Hardware is end of
life.  Review specification,
procure and install
refreshed hardware. 
Technology
Services Manager
2024/25 Completed. Hardware
was refreshed. 
Telephone
Corporate SIP
Existing service is end of
support
Technology
Services Manager
2024/25 Completed. Hardware
was refreshed. 
Legacy software
versions
Upgrading or removal of
software versions which
have become end of life. 
Head of IT Services 2024/25 Completed.
Applications including:  
- Oracle Financial
Management System
- Oracle Human
Resource
Management System
- EXOR (including
Spatial Manager and
Mapcapture) were
upgraded.
Replace legacy
servers & storage
Replacement of servers
and storage which is
faulty. 
Head of IT Services 2024/25 Completed. Several
Windows 2008 and
Windows 2012
servers have been
upgraded or disposed
of. 
109

Page 110

If you need this information in another language or format, please contact us to discuss how we
can best meet your needs.  
Phone: 0303 123 1015   
Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk 
110

Page 111

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Gaelic Language Plan 2025 to 2030 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Finance and Corporate Resources Committee of South Lanarkshire
Council’s third Gaelic Language Plan 2025 to 2030
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Gaelic Language Plan 2025 to 2030 as attached at Appendix 1 be
approved for final submission to Bòrd na Gàidhlig. 
3. Background
3.1. The Gaelic Language (Scotland) Act was passed by the Scottish Parliament in August
2005 with the aim of reversing the declining use of the Gaelic language.  As part of
the Act, Bòrd na Gàidhlig (the Bòrd) was created to develop and oversee the National
Plan for Gaelic which sets out a strategy to increase the occasions and circumstances
in which Gaelic can be used with equity to English.  It also aims to promote acquisition
of the language and participation in its culture by all who wish to do so. 
3.2. One of the key features of the 2005 Act is the provision enabling the Bòrd to require a
public authority to prepare a Gaelic Language Plan (GLP).  This provision was
designed to ensure that the public sector in Scotland plays its part in creating a
sustainable future for Gaelic by raising the status and profile of the language and
creating practical opportunities for its use. 
3.3. South Lanarkshire Council has a statutory duty to develop a GLP that endorses the
commitments in the Gaelic Language (Scotland) Act 2005 which are to:- 
 increase the number of persons who can use and understand the Gaelic language
 encourage the use and understanding of the Gaelic language
 facilitate access, in Scotland and elsewhere, to the Gaelic language and Gaelic
culture 
3.4. The Council’s first GLP was published in 2013 and spanned 6 years to 2018.  The
second GLP covered a further six years from 2019 to 2024.  The third iteration of the
plan has been developed for publication in 2025 and will be in action until 2030. 
11
111

Page 112

4. Development of the South Lanarkshire Council Gaelic Language Plan 2025 to
2030
4.1. The Council’s GLP 2025 to 2030 (Appendix 1) is a proportionate response to the
statutory duty that the council has, acknowledging both the size of the Gaelic speaking
community and working within the financial climate that currently exists. 
4.2. The GLP supports the aim of the National Gaelic Language Plan 2023-28 to increase
the use and learning of Gaelic and is written against the priority areas detailed in the
national plan, which are:- 
 community support
 support in the home
 creative industries
 business and economy
 public authorities
 0-18 education
 post school and adult learning 
4.3. Development of the GLP was a collaborative exercise with input across all Resources
and builds on the previous two plans.  The Bòrd also supported the development of
the GLP by attending working group sessions and providing feedback during
development of the plan. 
4.4. The statutory guidance on the development of the GLP requires local authorities to
undertake public consultation on their plans and publish the findings.  A public
consultation therefore launched on Friday 7 March 2025 and was available as an
online survey until Sunday 6 April 2025.  A summary of the findings is available in
section 1.6 of the GLP (Appendix 1). 
4.5. The Council was also required to provide a report to the Bòrd on the consultation
exercise, describing how the consultation was carried out and providing a summary of
the main themes that emerged from the consultation.  The consultation report is
included at Appendix 2. 
4.6. Following approval by the Bòrd, the council’s GLP 2025 to 2030 and consultation
report will be published in Gaelic and English on the Council’s website. 
5 Employee Implications
5.1. There are no employee implications arising directly from this report. 
6 Financial Implications
6.1. There are no financial implications arising directly from this report. 
7 Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications arising
directly from this report. 
8 Other Implications
8.1. There are no other implications arising directly from this report. 
112

Page 113

9 Integrated Impact Assessment and Consultation Requirements
9.1. There is no requirement for an integrated impact assessment in respect of this
report.  External consultation took place from 7 March 2025 to 6 April 2025. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent Employer 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you wish to inspect the background papers or want further information, please contact: -
Tracy Ferguson (Learning, Organisational Development & Diversity Manager)
Ext:  4715 (Tel:  01698 454715)
Email: tracy.ferguson@southlanarkshire.gov.uk 
113

Page 114

Appendix 1 
Gaelic Language Plan 2025 - 30 
This plan has been prepared under Section 3 of the Gaelic Language (Scotland) Act 2005
and was approved by Bòrd na Gàidhlig on (date TBC by the Bòrd).  
114

Page 115

FOREWORD
South Lanarkshire Council has developed the third edition of its Gaelic Language Plan in line
with the requirements of the Gaelic Language (Scotland) Act 2005.  The plan outlines how
we will take forward, and expand on, the work that was started in 2013 to raise awareness of
the language amongst both our employees and community.
As a Council we will continue our commitment to work with Bòrd na Gàidhlig, our community
planning partners and others to help safeguard the Gaelic language for future generations.
We welcome the opportunity to raise awareness and help secure, promote and develop the
Gaelic language, heritage and culture for our current and future generations through the third
edition of our Gaelic Language Plan covering the period 2025-30. 
The plan sets out how we will take forward the progress made over the last six years to raise
the profile and visibility of Gaelic in a way that is both proportionate and relevant to the South
Lanarkshire community, and it details how the Council will work to support the National Gaelic
Language Plan objectives over the next six years to meet our obligations in an outcome
focussed way that ensures our communities, our community planning partners and other
stakeholders can see how we are continuing to promote and use Gaelic.
The Council’s Gaelic Language Plan will contribute to raising the profile and visibility of Gaelic
by sharing good practice and creating opportunities for those who are interested in Gaelic to
use the language in their daily lives.  In doing so, we show our support for the aspirations and
objectives included in the National Gaelic Language Plan 2023 – 2028 and the Gaelic
Language (Scotland) Act 2005 in ensuring that Gaelic remains a living language and
distinctive aspect of our country’s cultural heritage.
We recognise the valuable contribution of the language already in the provision of Gaelic
medium education and have seen the benefits to our area of encouraging and attracting arts
and cultural activities.  These are activities that we commit to maintaining and developing
over the years ahead so that the part we play in helping to deliver the national plan will be
one that will have a lasting effect.
Paul Manning
Chief Executive
South Lanarkshire Council 
115

Page 116

CONTENTS
FOREWORD ................................................................................................................... 5
1 Introduction ............................................................................................................. 7
1.1 South Lanarkshire Council .............................................................................. 7
1.2 Gaelic within South Lanarkshire Council ..................................................... 8
1.3 Gaelic within Scotland ................................................................................... 11
1.4 The Gaelic Language (Scotland) Act 2005 ................................................ 11
1.5 The National Gaelic Language Plan 2023-28 ............................................ 12
1.6 Public Consultation......................................................................................... 12
1.7 Key Principles .................................................................................................. 13
2 Priorities ................................................................................................................. 14
2.1 Priority Areas: Community Support ............................................................. 14
2.2 Priority Areas: Support in the Home ........................................................... 15
2.3 Priority Areas: Creative Industries .............................................................. 16
2.4 Priority Areas: Business and the Economy ................................................ 17
2.5 Priority Areas: Public Authorities ................................................................. 18
2.6 Priority Areas: Education - 0 to 18 Years .................................................. 19
2.7 Priority Areas: Education – Postschool and Adult Learning ................... 20
3 Implementation and Monitoring ....................................................................... 21
3.1 Publishing and Publicising the Plan ............................................................ 21
3.2 Resourcing the Plan ....................................................................................... 21
3.3 Implementing and Monitoring the Plan ....................................................... 21
4 Corporate Responsibility ................................................................................... 22 
116

Page 117

1 Introduction
1.1 South Lanarkshire Council
The council delivers a wide range of services that touch all communities and every household
in South Lanarkshire.  South Lanarkshire is a diverse and dynamic area covering 1,772
square kilometres of varied geographical territory, 80% of which is in agricultural use, they
are made up of rural and urban areas, with three out of four people in South Lanarkshire
living in an urban area.
South Lanarkshire is the fifth largest council area in Scotland with a population of 320,000 a
working age population of 203,000 and around 145,000 households who live in the suburban
towns, rural towns, and villages.
The council employ in the region of 17,086 employees across five Resources.  Each of the
following five resources is tasked with delivering the key priority objectives of the Council: 
• Community and Enterprise Resources
• Education Resources
• Finance and Corporate Resources
• Housing and Technical Services Resources
• Social Work Resources 
At the heart of the council’s vision are our values based on fairness, empathy, and
commitment to make a difference to the lives of all our citizens and communities.  Our values
express our determination to be ambitious for South Lanarkshire and to be a high performing
and high achieving council who is fully committed to building a strong future workforce to
support the delivery of service to our communities who need them most.  South Lanarkshire
Council’s Plan, Connect, explains how the council will achieve this across all five resources. 
Further information about the council and its services is available on the Council’s website. 
117

Page 118

1.2 Gaelic within South Lanarkshire Council
South Lanarkshire Council recognises that Gaelic is an integral part of Scotland’s heritage
and national identity.  We acknowledge the challenge that exists to raise the profile and use
of Gaelic in our communities and daily lives.
This document is the third edition of South Lanarkshire Council’s Gaelic Language Plan
prepared within the framework of the Gaelic Language (Scotland) Act 2005.  It sets out the
high-level aims aligned to the priorities of the national plan and provides an implementation
plan for the next six years that provides targets to be progressed through the life of the plan. 
Gaelic Skills
The 2022 census data shows that 4,202 (1.3%) of the South Lanarkshire population have
Gaelic language skills.  Despite this number being low in comparison to the population of
South Lanarkshire, over the last 11 years the number of people speaking, writing and reading
Gaelic has increased by 209% from 1,358 as recorded in the 2011 Census. 
Gaelic Medium Education
The Gaelic Language Plan aims to build on the progress made since 2013 when the first plan
was published.  Some of the most recent progress that has taken place over the last six years
includes: 
• As part of a Central Belt Moderation Group, facilitated by The West Partnership and
Glasgow Gaelic School, both our primary and secondary practitioners have engaged
in a first of its kind cross-authority moderation activity with other Gaelic Medium
Education (GME) establishments in the central belt.  This is focused on a shared GME
Language Continuum and raising standards in writing, literacy and oral skills and will
provide a shared understanding of progress across primary and secondary education.
• In terms of strengthening our GME ethos and promoting uninterrupted 3-18 GME
learner journey, Mount Cameron Primary School hosts an excellent induction program
for children moving from Nursery into Primary 1.
• At primary level, considerable work has been completed on the Gaelic spelling and
Gaelic to English ratio approach via the School Improvement Plan which is set out to
focus on writing independence and has led to a new model of spelling.  
• Mount Cameron Primary has appointed a further Early Year’s Practitioner due to the
increased demand for places in the Gaelic Nursery class.  The GME nursery class
was awarded ‘very good’ evaluations in all indicators during a Care Inspectorate Visit
and has been the focus of good practice visits from other establishments in South
Lanarkshire in the last year.  
• Calderglen High School appointed an additional member of GME staff in 2022-23. 
This enabled them to develop their GM curriculum to offer GME History and Personal,
Social, Health and Economics to all S1 and S2 pupils, with an expanded offer of
118

Page 119

Religious, Moral and Philosophical Studies in 2023-24.  Education Resources have
also been able to continue its Gaelic Masterclass offer for S3 pupils, where they have
the option of learning Gaelic over 2 periods each week. 
• Changes in transport arrangements and promotional activities are being put in place
to promote the provision in both primary and secondary settings with the aim of
increase pupil numbers at both schools.
• A Gaelic Language Plan Subgroup meets regularly to discuss developing actions
contained within the plan.  Representatives from each Resource have been providing
updates on the actions agreed in the plan and this work will continue.  A working group
is also in place to develop the provision of GME across early years, primary and
secondary settings. 
Education Resources continue to make a significant contribution to raise the profile and
promote the Gaelic language across our schools through ongoing enhancement of the
curriculum and through developing and running a wide and extensively varied programme
of extracurricular activities.  This plan aims to continue to focus on that work and promote
Gaelic use at home and within the workplace.
Families interested in Gaelic-medium education will find more information on the South
Lanarkshire Council website. 
119

Page 120

Gaelic Language Employee Survey
In the 2023 employee survey 526 employees responded about their Gaelic language skills. 
Of 526 employees who responded not all respondents answered every question.
Do you know anyone who speaks Scottish Gaelic? 229 respondents said yes
288 respondents said no
Who are the Gaelic speakers you know? 71 friends
55 acquaintances
43 work colleagues
42 other relatives
32 immediate family
17 other
What Gaelic language skills do you have? 467 none
36 learning Gaelic
27 understand spoken Gaelic
24 speak Gaelic
23 read Gaelic
15 write Gaelic
What level of understanding do you have?
Note: responses relate to any or all of the following
- understanding, speaking, reading and writing.
201 beginner
7 basic level
4 intermediate
7 advanced
How confident are you when speaking to others in
Gaelic?
219 not applicable
64 not confident
7 very confident
2 fairly confident
Where would you normally use Gaelic? 54 other
34 home
29 in a Gaelic class
26 Gaelic media
22 Social gatherings
20 work
16 cultural events
15 online / social media
10 in the pub
3 places of worship
Are you aware of the council’s commitment to the
Gaelic language?
229 Yes
288 No
How often do you communicate using Gaelic in a
week?
(includes spoken, written, email, social media)
43 never
7 less often
5 once a week
4 daily
Interest in Gaelic learning opportunities 301 none
138 taster session
138 learning course
98 awareness course
50 conversation class
5 other  
120

Page 121

1.3 Gaelic within Scotland
Across Scotland 130,161 of people aged 3 years old and above are recorded in the 2022
Census to have Gaelic language skills.  This represents 2.5% of the population and has
increased by 50% from the 2011 Census, which recorded that 87,000 people in Scotland
were able to speak, read, write and/or understand Gaelic.
Bòrd na Gàidhlig is the principal public body in Scotland responsible for promoting Gaelic
development, including providing advice to Scottish Ministers on Gaelic issues.  Their aim is
that Gaelic is seen and heard daily across Scotland, such that it is widely recognised as an
integral part of Scottish life and a national cultural and economic asset.
1.4 The Gaelic Language (Scotland) Act 2005
A Gaelic Language Plan is a legal requirement following from the Gaelic Language (Scotland)
Act 2005, which was passed by the Scottish Parliament in August 2005.  The Gaelic
Language (Scotland) Act 2005 was passed with a view to securing the status of the Gaelic
language as an official language of Scotland commanding equal respect to the English
language. 
One of the key features of the 2005 Act is the provision enabling Bòrd na Gàidhlig to require
a public authority to prepare a Gaelic Language Plan.  This provision was designed to ensure
that the public sector in Scotland plays its part in creating a sustainable future for Gaelic by
raising the status and profile of the language and creating practical opportunities for its use. 
South Lanarkshire Council endorses the commitments in the Gaelic Language (Scotland) Act
2005 to: 
• increase the number of persons who can use and understand the Gaelic language
• encourage the use and understanding of the Gaelic language
• facilitate access, in Scotland and elsewhere, to the Gaelic language and Gaelic
culture. 
This document is South Lanarkshire Council’s third Gaelic Language Plan, prepared
within the framework of the Gaelic Language (Scotland) Act 2005.  It sets out how the
council will use Gaelic in the operation of its functions, how it will enable the use of Gaelic
when communicating with the public and key partners, and how the council will promote
and develop Gaelic.  South Lanarkshire Council’s Gaelic Language Plan has been
prepared in accordance with statutory criteria set out in the 2005 Act and having regard
to the National Gaelic Language Plan and the Guidance on the Development of Gaelic
Language Plans.
121

Page 122

1.5 The National Gaelic Language Plan 2023-28
South Lanarkshire Council supports the aim of increasing the use and learning of Gaelic, as
set out in the National Gaelic Language Plan 2023-28.  The council are committed to
achieving this aim by focussing our work on the key priorities of the national plan, which are:
• Community Support
• Support in the home
• Creative industries
• Business and economy
• Public authorities
• 0-18 education
• Post school and adult learning 
1.6 Public Consultation
The 2005 Act requires public authorities to consult on their Gaelic Language Plan therefore
a consultation was available on the South Lanarkshire Council website where it could be
completed online for just over 4-weeks, from Friday 7 March to Sunday 6 April 2025.  The
online consultation was promoted through the council’s Facebook page, Bluesky social
media, and the council’s Citizen’s Network.
All consultations are available in alternative formats.  The ability to request an alternative
format is one of the council’s standards and this was publicised as part of the consultation
exercise..
The main themes in the survey included: - 
• Current Gaelic language ability
• Promoting the use of the Gaelic language 
• Learning the Gaelic language
• Feedback on the national and council Gaelic language plans 
The public consultation on the draft South Lanarkshire Council Gaelic Language Plan 2025
– 2030 was completed by 171 people and a summary of the key findings is provided: - 
67% of respondents have no Gaelic language ability.  The majority of respondents (57%)
said they would not like to learn more with the same number (57%) saying Gaelic should not
be promoted more.   
13% said they are learning Gaelic and 6% are either fluent or native speaks.  38% said they
would like to learn more Gaelic and 30% said they would like to see an increase in Gaelic. 
Regarding current plans, 73% of respondents have an awareness of the national plan and
64% of respondents are aware of the council’s plan, with 70% of respondents saying the
council’s plan is easy to read.  In terms of how closely the council’s plan reflects local
122

Page 123

priorities, 49% disagree and 40% agree the plan reflects the correct priorities for South
Lanarkshire. 
For more information and a deeper understanding of the quantitative data collected,
comments have been gathered throughout the consultation that provide further feedback and
understanding in relation to findings.
1.7 Key Principles
South Lanarkshire Council’s Gaelic Language Plan is underpinned by five key principles of
equal respect, active offer, mainstreaming, third parties and corporate parenting.  The
following section identifies the council’s commitment to these principles and how they are
applied throughout the plan.
Equal Respect
Under the terms of the 2005 Act, Bòrd na Gàidhlig works with a view to securing the status
of the Gaelic language as an official language of Scotland commanding equal respect to the
English language.  The Bòrd in turn expects that public authorities will demonstrate in their
plans how the principles will be achieved and maintained in practice.  South Lanarkshire
Council will ensure that where Gaelic is included as part of its operations and services, the
Gaelic language is of an equal standard and quality as those that are provided in English.
Active Offer
South Lanarkshire Council will make an active offer of our Gaelic language services to our
employees and the public.  This will ensure that where Gaelic services are made available
by us, Gaelic users are made aware of their existence and are actively encouraged to use
them.  This will take the responsibility away from the individual to ask for the service and will
give Gaelic users the confidence to know that their needs will be met if that is their choice. 
We will ensure that our Gaelic language services are as accessible as our English language
services.
Mainstreaming
South Lanarkshire Council will ensure that opportunities for the public and council employees
to use Gaelic are normalised.  In support of the National Gaelic Language Plan 2023-28, the
council aims for Gaelic to be used more often, by more people, and in a wider range of
situations so it becomes part of the day-to-day fabric of modern Scottish life.
Third Parties
Where appropriate, South Lanarkshire Council will seek support from Arm’s Length Executive
Organisations and other contractors to help with the delivery of the Gaelic Language Plan. 
South Lanarkshire Leisure and Culture are aware of the Gaelic Language Plan and actively
participate in the council’s working group.
Corporate Parenting
Any looked after children, young people and carers who have Gaelic as their first language
receive the same opportunities as those with other languages.  
123

Page 124

2 Priorities
South Lanarkshire Council recognises the priority areas identified in the National Gaelic
Language Plan 2023-28 will be primarily implemented through the South Lanarkshire Local
Plan 2025-30 and that where opportunities present, such as in the formation, renewal and
monitoring of policies, it will consider the commitments made in this plan and ensure that the
impacts on Gaelic will be in line with the National Gaelic Language Plan 2023-28.
This section sets out the council’s implementation plan for each of the priority areas which
will be reviewed and reported on annually over the next six years. 
2.1 Priority Areas: Community Support
To increase the use and learning of Gaelic in communities the following priority areas from
the national plan will be considered within the council’s Gaelic Language Plan 2025-30: - 
• Gaelic community networks and on-line communities
• Recognition of areas of linguistic significance for Gaelic
• Community-based Gaelic language plans
• Island Community Impact Assessments
• Network of Gaelic Development Officers
• Gaelic community events and activities for young people
• Community trusts and third-sector organisation
• Churches and faith organisations 
Community targets to increase the use and learning of Gaelic 
• Increase the profile and use of Gaelic through the availability of a range of Gaelic
medium services throughout the life of the plan to 2030.  This target will be managed
by Education Resources through the school improvement plan. 
• Ensure support for initiatives that promote the use of Gaelic among all kinds of
communities of speakers.  This target will be monitored annually.  Responsibility for
the achievement of this target will sit with the council’s Gaelic Language Plan working
group, where it will be monitored annually with the first review in 2026. 
• Initiatives that make use of the skills and abilities of Gaelic speakers in community
activities will be promoted through the council’s Gaelic Language Plan working group,
who will raise awareness of such initiatives.  This target will be reviewed on annually. 
• Create situations in which Gaelic can be used informally by young people and adult
learners in community-based activities.  This will be monitored annually for the life of
the plan. 
124

Page 125

• Promote the work undertaken by Mount Cameron Primary School and Calderglen High
School that has wider community impacts.  This will be monitored annually for the life
of the plan. 
2.2 Priority Areas: Support in the Home
The use of Gaelic in the home is essential to strengthening the language and culture.  To
increase the use and learning of Gaelic in homes the following priority areas from the national
plan will be considered within the council’s Gaelic Language Plan 2025-30: - 
• Digital resources in delivering quality Gaelic use and learning in the home
• NHS and public authority promotion of Gaelic in the home
• Gaelic books and resources
• Support for measures that promote the use of Gaelic in homes
• Encouragement for people to re-introduce more Gaelic use within the home setting
• Community Officer support for the use Gaelic in the home
• GME Early years, 0-3 provision and related initiatives
• Support for Gaelic learning for GME parents 
Targets to increase the use and learning of Gaelic in the home include: - 
• Building on the introduction of Bookbug sessions in St. Leonard’s library in January
2025, the council will facilitate an increase in Bookbug sessions through the provision
of a further eleven libraries by June 2025.   
• Establish a Gaelic collection at St. Leonard’s library by June 2025. 
• Meet the Books schools class visits to St. Leonard’s library to be delivered in Gaelic
with assistance of teaching staff by December 2025. 
• Ensure practical support, resources and advice are available for passing Gaelic on to
children in the home and in Gaelic early years education.  This target will be reviewed
annually for the life of the plan. 
• Ensure links are strengthened between the use of Gaelic in the home and Gaelic early
years provision by regularly exploring and reviewing opportunities.  This target will be
reviewed annually for the life of the plan.  
125

Page 126

2.3 Priority Areas: Creative Industries
Gaelic is an important part of our national heritage and the creative industries enhance
Scotland’s image as a diverse and appealing country.  To increase the use and learning of
Gaelic across the creative industries the following priority areas from the national plan will be
considered within the council’s Gaelic Language Plan 2025-30: - 
• MG ALBA and network of Gaelic media companies
• MG ALBA support for Gaelic arts
• Media activities appealing to young people
• Fèisean nan Gàidheal
• Arts organisations, activities and festivals
• Gaelic arts bodies
• The Royal National Mòd
• Support to create and use digital, media content 
Targets to increase the use and learning of Gaelic in the creative industries include: - 
• Support opportunities for the arts and media to showcase the Gaelic language.  This
target will be reviewed annually for the life of the plan to 2030.  
• Promote the visibility and audibility of Gaelic as a unique part of Scotland’s heritage.
• Increase the use of Gaelic in heritage and tourism venues where appropriate, including
introducing signage and interpretive materials in both Gaelic and English languages.
• Ensure that equal recognition is given to Gaelic and English, and that Gaelic is used
in places of special interest and in promoting national events.
• Ensure that the importance of Gaelic to Scotland’s history and its relevance today
features in the tourism experience.
• Provide Countryside Rangers with information and training to raise awareness to
enable them to provide information on the Gaelic language and Gaelic heritage in the
council area.
• Take any opportunities presented by Bòrd na Gàidhlig to work in partnership with their
Partnerships Manager to increase the profile of Gaelic in arts and culture events in the
area. This will be reviewed annually for the life of the plan. 
126

Page 127

2.4 Priority Areas: Business and the Economy
Studies undertaken by Bòrd na Gàidhlig demonstrate that Gaelic has an important and
increasing place in building the Scottish economy.  To increase the use and learning of Gaelic
across business the following priority areas from the national plan will be considered within
the council’s Gaelic Language Plan 2025-30: - 
• Gaelic in workplace, services and products
• Economic impact of Gaelic in Scotland
• Gaelic Entrepreneurial and leadership skills
• Gaelic labour market, skills development and training programmes
• Employment opportunities in the public sector and private sector
• Gaelic Medium Education, apprenticeships and careers 
Business and economy targets to increase the use and learning of Gaelic include: - 
• Ensure adequate attention is given to the recruitment, retention, education, support
and development of Gaelic Medium Education and Gaelic Language Education
teachers.  This target will be monitored annually for the life of the plan and through
Education Resources workforce monitoring process. 
• Employees within Education Resources are supported to undertake appropriate and
relevant continuous professional development activity to ensure they can deliver
services to the highest standards.  This includes development of their language skills. 
Employees in education are regularly involved in GME to enhance their language
skills.  This target will be monitored annually for the life of the plan. 
• Promote the council’s Gaelic Awareness eLearning module and monitor completion
rates which will be reported to the working group annually as part of the annual review
of the council’s plan. 
• Continue to monitor Gaelic language skills and interest in Gaelic learning among our
employees via the regular employee surveys.  The target for the next employee survey
is 2026.  
127

Page 128

2.5 Priority Areas: Public Authorities
To increase the use and learning of Gaelic in the work of public authorities the following
priority areas from the national plan will be considered within the council’s Gaelic Language
Plan 2025-30: -
• Gaelic in workplace, services and products
• Economic impact of Gaelic in Scotland
• Gaelic Entrepreneurial and leadership skills
• Gaelic labour market, skills development and training programmes
• Employment opportunities in the public sector and private sector
• Gaelic Medium Education, apprenticeships and careers 
Targets to increase the use and learning of Gaelic in the work of South Lanarkshire
Council include: - 
• The South Lanarkshire Council Gaelic Language Plan 2025-30 will be reviewed and
updated annually. 
• The council’s Gaelic Language Plan working group will meet regularly throughout each
year for the life of the plan and will include a wide representation of services to support
delivery of the plan and achievement of the priority targets. 
• The corporate standards on the use of Gaelic in responses to customers who contact
the council in Gaelic will be written in to the new Council Standards by 2026.   
• At the first rebranding opportunity, the council will adopt a bilingual corporate logo
which demonstrates equal respect for Gaelic and English.  The target for this is 2030. 
• Develop and introduce a Council Standards for signage that demonstrates equal
respect for Gaelic and English.  Target date 2030. 
• The council recognises the importance of facilitating quality interpretation services we
will therefore ensure appropriate translation and interpretation support is available
where required through the introduction of a new interpretation and translation
services contract. Target date is December 2025.  
128

Page 129

2.6 Priority Areas: Education - 0 to 18 Years
To increase the use and learning of Gaelic in education the following priority areas from the
national plan will be considered within the council’s Gaelic Language Plan 2025-30: - 
• Gaelic-medium Childcare and Early years, Primary and Secondary provision
• Digital online Gaelic Medium Education (GME) curriculum delivery
• Resources and training to support children and young people with additional learning
needs
• GME curriculum, Broad General Education and Senior Phase in the secondary
sector
• GME support and resources
• Gaelic (Learners) at L2, L3, BGE and Senior Phase 
Targets to increase the use and learning of Gaelic in education include: - 
• Take account of requirements under the Education Scotland Act (2016) and the
subsequent Statutory Guidance on Gaelic Education, including the duty to promote
and support GME and GLE. 
• Promote and support Gaelic Medium Education (GME) and Gaelic Learners’
Education (GLE) and also engage with parents in order to grow present and future
demand for Gaelic GME provision at primary and secondary levels.  This will be
reviewed annually for the life of the plan. 
• Improve the quality and availability of voluntary-led Gaelic pre-school activities and
statutory early year’s education. 
• Work with Bòrd na Gàidhlig and the Scottish Government to increase its provision of
GME and GLE, if demand exists. 
• Maintain awareness of our duties as a corporate parent to offer services through the
medium of Gaelic to young people with Gaelic under our care, increase initiatives to
promote, establish and expand both GME and GLE at primary and secondary levels. 
• Provide a wide range of opportunities for young people in both GME and GLE to
engage in activities that enhance their Gaelic skills through greater use. 
• Ensure all steps are taken to secure the quality of both GME and GLE through National
Guidance and other means.  
129

Page 130

2.7 Priority Areas: Education – Postschool and Adult Learning
There are opportunities to learn and study Gaelic as an adult therefore to increase the use
and learning of Gaelic in postschool and adult education the following priority areas from the
national plan will be considered within the council’s Gaelic Language Plan 2025-30: -
• Speak Gaelic and other adult education opportunities for learners
• Gaelic skills in careers opportunities, employment, skills training, and
apprenticeships
• GME Initial Teacher Education
• Courses for early years staff in the GME sector
• Professional development in leadership across GME
• Gaelic learning in Further Education/Higher Education institutions 
Targets to increase the use and learning of Gaelic postschool and in adult education
include: - 
• Extend access to, and participation in, a wide range of Gaelic learning opportunities
for adults and increase the numbers progressing to fluency. 
• Ensure opportunities for the continuity and progression of literacy and other language
skills for adults learning Gaelic and for fluent speakers. 
• Ensure good resources are available to support adults learning Gaelic. 
130

Page 131

3 Implementation and Monitoring
3.1 Publishing and Publicising the Plan
Internally, council employees and Elected Members will be informed of the publication of the
Gaelic Language Plan 2025-30 through the standard communication channels which include
the council’s intranet, internal briefings, and committees.
Externally, the plan will be published in Gaelic and in English on the South Lanarkshire
Council website. In addition, we will communicate the launch of the plan in South Lanarkshire
View and raise awareness of the plan through the social media.
3.2 Resourcing the Plan
Funding for all aspects of the plan comes from a variety of sources. In addition to costs being
met by existing resources, examples of additional and potential funding sources include: 
• Education per capita funding for schools
• Scottish Government Grant
• Additional capital funding from the Scottish Government
• Grants from Bòrd na Gàidhlig to support specific posts and projects. 
3.3 Implementing and Monitoring the Plan
Implementation of the South Lanarkshire Gaelic Language Plan 2025-30 will be overseen by
the Gaelic Language Plan working group which comprises representatives from a range of
council services and Bòrd na Gàidhlig.  
Monitoring of the South Lanarkshire Gaelic Language Plan 2025-30 will be undertaken by
the working group and also as part of Education Resources school improvement plans.  
Regular progress and update reports will be provided annually to the council’s Corporate
Management Team and Elected Members.
Progress towards meeting the aims and priorities contained in the plan will be published on
the South Lanarkshire website and included in the South Lanarkshire View as required.  
131

Page 132

4 Corporate Responsibility
The senior officer with operational responsibility for overseeing preparation, delivery and
monitoring of South Lanarkshire Council’s Gaelic Language Plan is:
Position:    Chief Executive 
Name of organisation:  South Lanarkshire Council
Council HQ
Almada Street
Hamilton
ML3 0AA
Telephone:   01698 454208
E-mail address:   pach.exec@southlanarkshire.gov.uk 
Questions about the day-to-day operation of the plan should be addressed to the:
Position:   Employee Development and Diversity Manager 
Department   Finance and Corporate Resources
Name of organisation:  South Lanarkshire Council
Council HQ
Almada Street
Hamilton
ML3 0AA
Telephone:   0303 123 1015
E-mail address:   equalities@southlanarkshire.gov.uk
In person by visiting any of our offices, addresses can be found on South
Lanarkshire Council’s website. 
If you need this information in another language or format, please contact us to discuss how
we can best meet your needs.  Phone 0303 123 1015 or email
equalities@southlanarkshire.gov.uk    
132

Page 133

Appendix 2 
South Lanarkshire Council
Gaelic Language Plan 2025 - 2030
Public Consultation Report  
133

Page 134

1 CONTENTS
1. Introduction ......................................................................................................... 25
2. Methodology ....................................................................................................... 25
3. Findings .............................................................................................................. 25 
134

Page 135

Introduction
1.1. South Lanarkshire is obliged by law to produce a draft Gaelic Language Plan that
sets out the actions the council will take to promote the use and learning of the
Gaelic language.  In development of that plan the council is required to publicly
consult to ensure the plan takes cognisance and reflects the views of the local
communities of South Lanarkshire. 
1.2. Bòrd na Gàidhlig is the principal public body in Scotland responsible for promoting
Gaelic development.  In line with the statutory guidance on the development of
Gaelic language plans, South Lanarkshire Council has carried out a public
consultation exercise.  This report describes how the consultation was carried out
and provides a summary of the main themes that emerged from the consultation. 
Methodology
2.1. The public consultation was managed through the council’s corporate consultation
service who developed the questionnaire in conjunction with the work being
undertaken by council’s Gaelic Language Plan working group; and the consultation
questions were designed to reflect the priorities in the National Gaelic Language
Plan 2023 -2028. 
2.2. The consultation was available on the South Lanarkshire Council website where it
could be completed online from Friday 7 March to Sunday 6 April 2025.  The online
consultation was promoted through the council’s Facebook page, Bluesky social
media, and the council’s Citizen’s Network.   
2.3. All consultations are available in alternative formats including a paper copy being
available if a consultation cannot be completed online.  The ability to request an
alternative format is one of the council’s standards and this was publicised as part of
this consultation. 
2.4. The main themes in the survey included: -
• Current Gaelic language ability
• Promoting the use of the Gaelic language 
• Learning the Gaelic language
• Feedback on the national and council Gaelic language plans.
Findings
3.1. The public consultation on the draft South Lanarkshire Council Gaelic Language
Plan 2025 – 2030 was completed by 171 people.  The following demographic
information has been provided regarding respondents: - 
Locations
• 32% Hamilton area
• 29% Clydesdale area
• 26% East Kilbride or Strathaven areas
• 13% Cambuslang or Rutherglen areas 
135

Page 136

Age
• 37% Aged 50 – 64
• 30% Aged 35 – 49
• 19% Aged 65 years and over
• 8% Aged 25 – 34
• 2% Aged 16 – 24
• 1% up to 15
• 3% of respondents chose not to specify an age range.
Gender
• 60% Female
• 33% Male
• 7% other/prefer not to answer
National Identity
• 69% Scottish
• 21% British
• 7% other/prefer not to say
• 2% English
• 1% Irish
3.2.  The key findings from the theme: Current Gaelic language ability are as follows: -
• 67% of respondents have no ability
• 13% are learning Gaelic
• 6% are fluent/native speakers
This section also asked where people learned or are learning Gaelic and there is a
broad range of responses including learning with local authorities, schools and
different online resources. 
3.3. The key findings from the theme: Promoting the use of Gaelic in South
Lanarkshire are as follows: -
• 57% of respondents said there should be no increase in the use of Gaelic 
• 30% of respondents said there should be a large increase in the use of Gaelic 
• 14% of respondents said there should be some increase in the use of Gaelic 
3.4.  The key findings from the theme: Learning the Gaelic Language are as follows: -
• 57% of respondents said no, they would not like to learn more
• 38% said yes, they would like to learn more
• 5% said they would possibly be interested in learning more
3.5.  The key findings from the theme: national and council Gaelic Language Plans are
as follows: - 
National Gaelic Language Plan
• 39% of respondents have some awareness of the national plan
• 34% of respondents are fully aware of the national plan
• 27% of respondents have no awareness of the national plan 
136

Page 137

South Lanarkshire Council’s Gaelic Language Plan
• 38% of respondents have some awareness of the council’s Plan
• 36% of respondents have no awareness of the council’s plan
• 26% of respondents are fully aware of the council’s plan 
Of the 64% of respondents that have read the council’s Gaelic Language Plan, 70%
said it is easy to read. Other finding include the following: -
• 41% strongly agree that it is important to promote Gaelic 
• 38% strongly disagree that Gaelic should be promoted 
South Lanarkshire Council’s draft Gaelic Language Plan 2025 – 2030 mirrors the
priorities in the National Gaelic Language 2023 – 2028.  When asked about the
priorities and areas covered, 43% of respondents stated the council’s proposed
priorities are clear in the plan with 44% of respondents saying the plan covers areas
they are interested in, and 48% of respondents saying the plan doesn’t cover areas
they are interested in.  When asked how the plan reflects the priorities for South
Lanarkshire: - 
• 49% disagree the plan reflects the correct priorities for South Lanarkshire
• 40% agree the plan reflects the correct priorities for South Lanarkshire
3.6. Qualitative data was also gathered throughout the consultation that provide further
feedback and understanding in relation to the quantitative data. 
137

Page 138

138

Page 139

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Amendment to Local Government Pension Scheme
Discretions Policy 
1. Purpose of Report
1.1. The purpose of the report is to:-
purpose]
 update the Finance and Corporate Resources Committee on the amendment to
the Council’s Statement of Policy on discretions in relation to the Local
Government Pensions Scheme (LGPS) 2015 (Scotland), as governed by the
2018 regulations
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report be noted; and
(2) that the revision to the Statement of Policy in respect of the Local Government
Pensions Scheme employer discretions be approved.
[1recs]
3. Background
3.1. Employers participating in the Local Government Pension Scheme (LGPS) in
Scotland are required to formulate, publish and keep under review a policy statement
on certain discretions which they have the power to exercise in relation to members
of the CARE pension scheme (enacted on 1 April 2015).  Employers also have the
same duties in relation to discretions relating to members of the pension schemes in
place prior to 1 April 2015. 
3.2. The Council’s existing list of discretions, which also cover Lanarkshire Valuation
Joint Board, Seemis LLP and South Lanarkshire Leisure and Culture, was approved
by the Finance and Corporate Resources Committee on 18 March 2015. 
3.3. The list of discretions relates to the following pension scheme regulations:- 
 the LGPS (Scotland) Regulations 2018
 the LGPS (Transitional Provisions and Savings) (Scotland) Regulations 2014
 the LGPS (Scotland) Regulations 2014
 the LGPS (Administration) (Scotland) Regulations 2008 (in respect of leavers
between 1 April 2009 and 31 March 2015)
 the LGPS (Scotland) Regulations 1998 (in respect of leavers between 1 April
1998 and 31 March 2009. 
12
139

Page 140

4. Update to the Council’s policy statement on Local Government Pension
Scheme (Scotland) Regulations 2018
4.1. In 2016, the LGPS (Scotland) regulations were amended to provide employers with
the discretion to implement a shared cost additional voluntary contributions (SCAVC)
scheme via salary sacrifice.  Such schemes offer financial benefits to both employers
and pension scheme members by way of tax relief and reduced national insurance
contributions.  A saving linked to the introduction of this scheme was approved in the
February 2025 budget meeting. 
4.2. The Council is working to implement a salary sacrifice SCAVC scheme and must
consequently update its discretions policy to this effect.  To align with the scheme
being launched, the Council requires to enable regulation 17 (clause 1) of the above
regulations, which provides employers with the discretion to offer their workforce the
opportunity to contribute to a salary sacrifice SCAVC scheme. 
4.3. The updated policy statement on the Council’s employer discretions, is detailed in
full at Appendix 1.  This includes the revised policy statement relating to the
enablement of regulation 17(1) aligning to the implementation of the SCAVC
scheme.  The Council’s policy in relation to all other employer discretions remains
unchanged. 
4.4. When approved, the updated discretions policy will be published on the intranet. 
4.5. Strathclyde Pension Fund has been informed of the Council’s intention to introduce a
salary sacrifice SCAVC scheme and the associated update to the Council’s policy
statement allowing regulation 17 (clause 1) of the regulations to be enabled. 
5. Employee Implications
5.1. This policy change to enable regulation 17 (clause 1) will provide local government
pension scheme members with the opportunity to enter into a salary sacrifice
SCAVC arrangement.  This change is beneficial to employees as the new scheme
will provide a more tax efficient way to save for retirement compared to the standard
AVC option which is currently available. 
5.2. Information on the introduction of the new salary sacrifice SCAVC scheme will be
communicated to LGPS members via a Personnel Circular to provide high level
information on the introduction of the salary sacrifice SCAVC scheme.  AVC holders
and LGPS members will also receive more detailed information by email. 
5.3. Except for enabling regulation 17 (clause 1), no other changes have been made to
the Council’s discretions policy and the application of pension related policies
continue to be closely monitored by Personnel Services to ensure consistency of
application.  Information is routinely reported to Finance and Corporate Resources
Committee in the Early Retirement, Voluntary Severance and Redeployment report. 
6. Financial Implications
6.1. There are no additional costs associated with the information presented in this
report, as the cost of administering the salary sacrifice SCAVC scheme will be offset
against the employer savings, which have already been taken. 
7. Climate Change, sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications associated
with this report.
140

Page 141

8. Other Implications
8.1. The Council’s position on the employer discretions is subject to regular checks to
ensure best value, fit for purpose and compliance with other related regulations. 
This will continue to be monitored by the Head of Personnel Services. 
9. Integrated Impact Assessments and Consultation Requirements
9.1. Discretions available under the LGPS are determined by pension regulations, with
employers determining whether or not to exercise specific discretions. 
9.2 A number of discretions are age specific and apply to those employees aged 55 or
over (age 50 for protected members).  These age-related criteria are out with the
Council’s control since they are a requirement of the LGPS regulations; however, it is
possible that they could give rise to an adverse impact based on age as a result.  To
mitigate this risk, discretions are applied in a fair, consistent and transparent manner. 
9.3. The salary sacrifice SCAVC will be open to LGPS members regardless of age.  As
with other Council salary sacrifice schemes in operation, employees will be unable to
join the SCAVC scheme if their proposed AVC contribution takes their pay below the
national minimum wage.  The communication issued to employees will also highlight
the potential impact that reduced national insurance contributions could have on their
current benefits or future state pension. 
9.4. Trades Union members have been made aware via the JTUC Executive. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
11 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Excellent Employer
 Accountable, Effective and Efficient 
 People focused
 Fair and open 
Previous References
 Finance and Corporate Resources Committee - 27 June 2012
 Finance and Corporate Resources Committee - 18 March 2015 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Michelle Milne, Head of Personnel Services
Ext:  4330 (01698 454330)
Email:  michelle.milne@southlanarkshire.gov.uk 
141

Page 142

142

Page 143

OFFICIAL
OFFICIAL
1
Policy Statement Local Government Pension Scheme (Scotland) Regulations 2018
(LGPS)
Version 3 dated 11 May 2025 
Employer: South Lanarkshire Council 
Lead officer (for any questions): Danielle Lang 
Contact details of lead officer: danielle.lang@southlanarkshire.gov.uk 
Date of original policy statement: March 2015 
Date for further review: May 2028 
We are aware of our obligations under: 
• the LGPS (Scotland) Regulations 2018
• the LGPS (Transitional Provisions and Savings) (Scotland) Regulations 2014
• the LGPS (Scotland) Regulations 2014
• the LGPS (Administration) (Scotland) Regulations 2008 (in respect of leavers between 1 April 2009 and 31 March 2015)
• the LGPS (Scotland) Regulations 1998 (in respect of leavers between 1 April 1998 and 31 March 2009 
In developing our policy statement, we are aware that the LGPC has produced a document called “Discretions Policies” that contains tips for employers,
see: http://www.lgpsregs.org/index.php/scotland/admin-guides  
12
143

Page 144

OFFICIAL
OFFICIAL
2
Note: * in the following tables beside a regulation denotes the discretions where we are required to have a policy statement under the regulations 
Table 1 details our discretions under the LGPS (Scotland) regulations 2018 
Table 2 details our discretions in relation to scheme members who ceased active membership on or after 01 04 15 and before 31 05 18. 
Table 3 details our discretions in relation to scheme members who ceased active membership on or after 01 04 09 and before 01 04 15.P 
Table 4 details our discretions under the LGPS (Scotland) Regulations 1998 (as amended) in relation to pre 01 04 09 scheme leavers. 
Table 5 details our discretions under the Local Government (Discretionary Payments and Injury Benefits) (Scotland) Regulations 1998 (as amended). 
TABLE 1 
The following table details our discretions from 01 06 18 in relation to post 01 06 18 active members and post 01 06 18 leavers, being
discretions under: 
- the LGPS (Scotland) Regulations 2018 [prefix R]
- the LGPS (Scotland) Regulations 2014 [prefix R2]
- the LGPS (Transitional Provisions and Savings) (Scotland) Regulations 2014 [prefix TP]
- the LGPS (Administration) (Scotland) Regulations 2008 [prefix A]
- the LGPS (Benefits, Membership and Contributions) (Scotland) Regulations 2008 (as amended) [prefix B]
- the LGPS (Transitional Provisions) (Scotland) Regulations 2008 [prefix T]
- the LGPS (Scotland) Regulations 1998 (as amended) [prefix L] 
144

Page 145

OFFICIAL
OFFICIAL
3
Regulation Discretion South Lanarkshire Council’s policy on the exercise of this discretion 
R3(1)(b)
Decide which employees to nominate for
membership (admission bodies)
All employees who are eligible to join the Scheme will be nominated for
membership in accordance with South Lanarkshire Council’s admission
agreement with SPFO (namely South Lanarkshire Leisure and Culture,
Lanarkshire Valuation Joint Board, SEEMiS LLp.) 
RSch 2, Part 2,
para 12(c)
Whether, in respect of an admission body
providing a service in respect of outsourced
work, to set off against payments due to that
body any sums due from that body to the
Fund
The Council will consider any application of this discretion on a case-by-
case basis.
R9(1) to R9(4)  Determine the rate of employee’s
contributions 
The council will exercise this discretion; the employee’s rate of
contributions will be determined in accordance with these regulations and
from the guidance issued by the Scottish Ministers.
R9(8)  Determine intervals at which employees’
contributions are to be made  The council will exercise this discretion; employees’ contributions will be
aligned to the Council’s 4 weekly pay cycle.
R16(2)(e)* &
R16(4)(d)* 
Whether, how much, and in what
circumstances to contribute to a shared cost
APC scheme 
The Council will exercise this discretion. 
R16(16)  Whether to extend 30 day deadline for
member to elect for a shared cost APC upon
return from a period of absence from work
with permission with no pensionable pay
(otherwise than because of illness or injury,
relevant child-related leave or reserve force
service leave) 
The Council will exercise this discretion.  
145

Page 146

OFFICIAL
OFFICIAL
4
R17(1) &
definition of
SCAVC in RSch
1 
Whether, and in what circumstances to
contribute to a shared cost AVC scheme. 
The council will exercise this discretion and shall establish a shared cost
AVC scheme, which members will have the option to elect to participate in
TP15(1)(b) & 
L65(8) & former
L65(9)(b)  
Allow late application to convert scheme
AVCs into membership credit i.e. allow
application more than 30 days after
cessation of active membership (where AVC
arrangement was entered into before
30/6/05) 
The council will not exercise this discretion.
R19(2)  No right to a return of contributions due to an
offence of a fraudulent character or grave
misconduct unless the employer directs a
total or partial refund is to be made
The council will exercise this discretion and will not direct a return of
contributions in the event of an offence of a fraudulent character or grave
misconduct.
R20(1)(b)  Specify in an employee’s contract what other
payments or benefits, other than those
specified in R20(1)(a) and not otherwise
precluded by R20(2), are to be pensionable 
The council will exercise this discretion. Elements of pay received by an
employee, other than those specified in these regulations and not otherwise
precluded, will only be pensionable if specified as such in the member’s
contract of employment. This will be determined in accordance with SPPA
guidance on the matter.
R21(5)  In determining Assumed Pensionable Pay
(APP), whether a lump sum payment made
in the previous 12 months is a “regular lump
sum” 
The council will exercise this discretion on a case-by-case basis. A
determination will only be made if there is a reasonable expectation that
such a payment would be paid on a regular basis.
R22(7B)  Whether to extend the 12-month option
period for a member to elect that post 2015
deferred benefits should not be aggregated
with an ongoing concurrent employment 
The council will exercise this discretion on a case-by-case basis. It will not
normally extend the 12-month time limit but may do so if exceptional
circumstances can be demonstrated.  Each case will be considered on its
merits.
146

Page 147

OFFICIAL
OFFICIAL
5
R22(8B) Whether to extend the 12-month option
period for a member to elect that post 2015
deferred benefits should not be aggregated
with a new employment 
The council will exercise this discretion on a case-by-case basis. It will not
normally extend the 12-month time limit but may do so if exceptional
circumstances can be demonstrated.  Each case will be considered on its
merits.
TP10(6) Whether to extend the 12-month option
period for a member to elect that pre 2015
deferred benefits for a member who re-joined
post 31 March 2015 can be aggregated to
purchase an amount of CARE pension 
The council will exercise this discretion on a case-by-case basis. It will not
normally extend the 12-month time limit but may do so if exceptional
circumstances can be demonstrated.  Each case will be considered on its
merits.
R29(7)* &
TP11(2) 
Whether all or some benefits can be paid if
an employee reduces their hours or grade
prior to age 60 (flexible retirement)
The council will exercise this discretion. Arrangements and eligibility criteria
are set out in the Council’s flexible retirement policy.  
R29(9)* and
TPSch 2, para
2(1) 
Whether to waive, in whole or in part, any
actuarial reduction on benefits paid on
flexible retirement.
Note: any resultant strain cost from the
exercise of this discretion will be charged to
the employer regardless of the member’s
age at date of retirement.
The council will not exercise this discretion.   
R29(9)*  Whether to waive, in whole or in part,
actuarial reduction on benefits which a
member voluntarily draws before normal
pension age, other than on the grounds of
flexible retirement (where the member only
has post 31/3/15 membership) 
Note: any resultant strain costs due to the
exercise of this discretion will be charged to
the employer regardless of the employee’s
age.
The council will not exercise this discretion.  
.
147

Page 148

OFFICIAL
OFFICIAL
6
TPSch 2, paras
1(2) and 2(1)* 
Whether to apply the 85 year rule for a
member voluntarily drawing benefits, with
employer consent, on or after age 
55 and before age 60 (other than on the
grounds of flexible retirement). 
The council will not exercise this discretion.   
TP3(1), TPSch
2, para 2(1) * 
Whether to waive, in whole or in part, any
actuarial reduction on pre and post April
2015 benefits which a member voluntarily
draws before normal pension age other than
on the grounds of flexible retirement (where
the member has both pre 1/4/15 and post
31/3/15 membership and is subject to the 85
year rule) 
The council will not exercise this discretion.   
TP3(1), (5) and
(12), TPSch 2,
para 2(1) 
Whether to waive, in whole or in part, any
actuarial reduction on pre and post April
2015 benefits which a member voluntarily
draws before normal pension age other than
on the grounds of flexible retirement (where
the member has both pre 1/4/15 and post
31/3/15 membership) 
The council will exercise this discretion. Each case will be considered on an
individual basis taking into account costs to the council, impact on service
delivery and the particular personal circumstances of the member. 
R30*  Whether to grant additional pension to an
active member or within 6 months of ceasing
to be an active member by reason of
redundancy or business efficiency (by up to
£5,000 p.a.) 
The council will not exercise this discretion.   
R86(1) & (8) 
R86(4) 
Whether to apply to Scottish Ministers for a
forfeiture certificate (where a member is
convicted of a relevant offence) and
subsequently whether to direct that benefits
The council will exercise this discretion and after considering each case on
its individual merits, may apply for a forfeiture certificate where a member is
convicted of a relevant offence and, following the issue of the certificate,
may direct that benefits are to be forfeited.
148

Page 149

OFFICIAL
OFFICIAL
7
are to be forfeited (other than rights to GMP
– but see R89 below) 
R87(2)  Whether to recover from the fund any
monetary obligation or, if less, the value of
the member’s benefits (other than
transferred in pension rights or AVCs /
SCAVCs) where the obligation was as a
result of a criminal, negligent or fraudulent
act or omission in connection with the
employment and as a result of which the
person has left the employment.
The council will exercise this discretion. After considering each case on its
individual merits, the Council may recover the amount of loss in cases of
criminal, negligent or fraudulent acts by a member from Strathclyde
Pension Fund.
R89  Whether, if the member has committed
treason or been imprisoned for at least 10
years for one or more offences under the
Official Secrets Acts, forfeiture under R86 or
recovery of a monetary obligation under R87
should deprive the member or the member’s
surviving spouse or civil partner of any GMP
entitlement 
The council will not exercise this discretion.
R90(5)  Decide whether to issue a Certificate of
Protection if the member does not request
one within 12 months of a reduction or
restriction in pay
The Council will exercise this discretion and will issue a Certificate of
Protection of pension benefits if requested by the employee within twelve
months of the date of reduction. A certificate may be issued on application
from the member out with the 12-month period specified in the regulations if
exceptional circumstances can be demonstrated, such as the employee
being unaware of this facility.
R93(1)(b)  Agree to bulk transfer payment  The Council will consult with SPFO and the fund actuaries in this regard.
149

Page 150

OFFICIAL
OFFICIAL
8
R95(6)  Extend normal time limit for acceptance of a
transfer value beyond the 12 month time limit
from joining the LGPS
The council will exercise this discretion. Although it will not generally extend
the normal time limit for acceptance of a transfer value beyond 12 months
from joining the scheme it may do so where exceptional circumstances can
be proved. Each case will be considered on its individual merits including if
there would be any financial impact on the council and/or the Pension
Fund.
TP3(6),
TP4(6)(c),
TP8(4),
TP10(2)(a),
TP17(2)(b) &
B11(2) 
Whether to allow a member to select final
pay period for fees to be any 3 consecutive
years ending in the 10 years prior to leaving
and ending on the anniversary of the date of
leaving 
The council will allow a member to select final pay for fees to be any three
consecutive years ending 31st March in the 10 years prior to leaving. The
council agree that this will automatically be done by SPFO.
TP3(1)(a),
A43(5) 
Issue a certificate of protection of pension
benefits where eligible non-councillor
member fails to apply for one (pay cuts /
restrictions occurring pre 01 04 15) 
The council will exercise this discretion. A certificate of protection will be
automatically issued within twelve months of the date of reduction. 
R 29 (6) and 29
(9)
Whether to grant application to waive all or
part of the actuarial reduction applied for
early payment of benefits on or after age 55 
The Council will not exercise this discretion. 
150

Page 151

OFFICIAL
OFFICIAL
9
TABLE 2 
The following table details discretions in relation to scheme members who ceased active membership on or after 01 04 15 and before 30 05 18,
being discretions under: 
- the Local Government Pension Scheme (Administration) (Scotland) Regulations 2008 [prefix A] 
- the Local Government Pension Scheme (Benefits, Membership and Contributions) (Scotland) Regulations 2008 (as amended) [prefix B] 
- the Local Government Pension Scheme (Transitional Provisions) (Scotland) Regulations 2008 [prefix T] 
- the Local Government Pension Scheme (Transitional Provisions and Savings) (Scotland) Regulations 2014 [prefix TP] 
- the Local Government Pension Scheme (Scotland) Regulations 2014 [prefix R2
- the Local Government Pension Scheme (Scotland) Regulations 2018[prefix R
- the Local Government Pension Scheme (Scotland) Regulations 1998 (as amended) [prefix L] 
Regulation Discretion South Lanarkshire Council’s policy on the exercise of this discretion
TP15(1)(b) & 
L65(8) & former
L65(9)(b)  
Allow late application to convert scheme
AVCs into membership credit i.e. allow
application more than 30 days after
cessation of active membership (where AVC
arrangement was entered into before
30/6/05) 
The council will not exercise this discretion.
TP10(6) Whether to extend the 12 month option
period for a member to elect that pre 2015
deferred benefits for a member who re-joined
post 31 March 2015 can be aggregated to
purchase an amount of CARE pension 
The council will exercise this discretion. Although it will not normally extend
the 12-month time limit but may do so if exceptional circumstances can be
demonstrated.  Each case will be considered on its merits.
R2 ~ 29(9)*  Whether to waive, in whole or in part,
actuarial reduction on benefits which a
member voluntarily draws before normal
pension age, other than on the grounds of
flexible retirement (where the member only
has post 31/3/15 membership) 
The council will not exercise this discretion. 
151

Page 152

OFFICIAL
OFFICIAL
10 
Note: any resultant strain costs due to the
exercise of this discretion will be charged to
the employer regardless of the employee’s
age.
TPSch 2, paras
1(2) and 2(1)* 
Whether to apply the 85 year rule for a
member voluntarily drawing benefits, with
employer consent, on or after age 
55 and before age 60 (other than on the
grounds of flexible retirement). 
The council will not exercise this discretion. 
TP3(1), TPSch
2, para 2(1) * 
Whether to waive, in whole or in part, any
actuarial reduction on pre and post April
2015 benefits which a member voluntarily
draws before normal pension age other than
on the grounds of flexible retirement (where
the member has both pre 1/4/15 and post
31/3/15 membership and is subject to the 85
year rule) 
The council will not exercise this discretion. 
TP3(1), (5) and
(12), TPSch 2,
para 2(1) 
Whether to waive, in whole or in part, any
actuarial reduction on pre and post April
2015 benefits which a member voluntarily
draws before normal pension age other than
on the grounds of flexible retirement (where
the member has both pre 1/4/15 and post
31/3/15 membership) 
The council will not exercise this discretion. 
152

Page 153

OFFICIAL
OFFICIAL
11 
R2 ~ 89(1) & (8) 
R2 ~ 89(4) 
Whether to apply to Scottish Ministers for a
forfeiture certificate (where a member is
convicted of a relevant offence) and
subsequently whether to direct that benefits
are to be forfeited (other than rights to GMP
– but see R2 ~ 92 below) 
The council will exercise this discretion and will apply for a forfeiture
certificate where a member is convicted of a relevant offence and, following
the issue of the certificate, may direct that benefits are to be forfeited.
R2 ~ 90(2)  Whether to recover from the fund any
monetary obligation or, if less, the value of
the member’s benefits (other than
transferred in pension rights or AVCs /
SCAVCs) where the obligation was as a
result of a criminal, negligent or fraudulent
act or omission in connection with the
employment and as a result of which the
person has left the employment.
The council will exercise this discretion. After considering each case on its
individual merits, the council may recover from Strathclyde Pension Fund
the amount of loss in cases of criminal, negligent or fraudulent acts by a
member.
R2 ~ 92  Whether, if the member has committed
treason or been imprisoned for at least 10
years for one or more offences under the
Official Secrets Acts, forfeiture under R2 ~
89(1) & (8) or recovery of a monetary
obligation under R2 ~ 89(4) 
should deprive the member or the member’s
surviving spouse or civil partner of any GMP
entitlement 
The council will not exercise this discretion.
R2 ~ 93(5)  Decide whether to issue a Certificate of
Protection if the member does not request
one within 12 months of a reduction or
restriction in pay
The council will exercise this discretion. A Certificate of Protection of
pension benefits will be automatically within twelve months of the date of
reduction. A certificate may be issued on application from the member out
with the 12 month period specified in the regulations if exceptional
circumstances can be provided.
R2 ~ 95(1)(b)  Agree to bulk transfer payment  The council will exercise this discretion and will consult with SPFO and the
fund actuaries in this regard.
153

Page 154

OFFICIAL
OFFICIAL
12 
TP3(6),
TP4(6)(c),
TP8(4),
TP10(2)(a),
TP17(2)(b) &
B11(2) 
Whether to allow a member to select final
pay period for fees to be any 3 consecutive
years ending in the 10 years prior to leaving
and ending on the anniversary of the date of
leaving 
The council will allow a member to select final pay for fees to be any three
consecutive years ending 31st March in the 10 years prior to leaving. The
council agree that this will automatically be done by SPFO.
TP3(1)(a),
A43(5) 
Issue a certificate of protection of pension
benefits where eligible non-councillor
member fails to apply for one (pay cuts /
restrictions occurring pre 01 04 15) 
(The council will exercise this discretion. A Certificate of Protection of
pension benefits will be automatically within twelve months of the date of
reduction. A certificate may be issued on application from the member out
with the 12-month period specified in the regulations if exceptional
circumstances can be provided.
R2 29 (6) and 29
(9)
Whether to grant application to waive all or
part of the actuarial reduction applied for
early payment of benefits on or after age 55 
The council will not exercise this discretion.  
154

Page 155

OFFICIAL
OFFICIAL
13 
TABLE 3 
The following table details discretions in relation to scheme members who ceased active membership on or after 01 04 09 and before 01 04 15,
being discretions under: 
- the Local Government Pension Scheme (Administration) (Scotland) Regulations 2008 [prefix A] 
- the Local Government Pension Scheme (Benefits, Membership and Contributions) (Scotland) Regulations 2008 (as amended) [prefix B] 
- the Local Government Pension Scheme (Transitional Provisions) (Scotland) Regulations 2008 [prefix T] 
- the Local Government Pension Scheme (Transitional Provisions and Savings) (Scotland) Regulations 2014 [prefix TP] 
- the Local Government Pension Scheme (Scotland) Regulations 2014 [prefix R2
- the Local Government Pension Scheme (Scotland) Regulations 2014 [prefix R- the Local Government Pension Scheme (Scotland) Regulations
1998 (as amended) [prefix L] 
Regulation Discretion South Lanarkshire Council Policy on the exercise of this discretion
A42(2) No right to a return of contributions due to an
offence of a fraudulent character or grave
misconduct unless the employer directs a
total or partial refund is to be made
The council will exercise this discretion and will not direct a return of
contributions in the event of an offence of a fraudulent character or grave
misconduct.
A43(5) Employer may issue a certificate of
protection where an employee fails to apply
for one.
The council will exercise this discretion. A Certificate of Protection of
pension benefits will be automatically within twelve months of the date of
reduction. A certificate may be issued on application from the member
outwith the 12-month period specified in the regulations if exceptional
circumstances can be provided.
A45 (1) & (2) Whether Contribution Equivalent Premium
(CEP) in excess of the Certified Amount (CA) 
recovered from a refund of contributions 
can be recovered from the Pension 
Fund
The council will not exercise this discretion.
A66 (2) & (6)
A67 (1) & (2)
Whether to apply for a forfeiture certificate
(where a member is convicted of a relevant
The council will exercise this discretion and may apply for a forfeiture
certificate where a member is convicted of a relevant offence and following
the issue of the certificate, direct that benefits are to be forfeited. 
155

Page 156

OFFICIAL
OFFICIAL
14 
offence) and subsequently whether to direct
that benefits are to be forfeited.
A68(2) Whether to recover from the fund any
monetary obligation or, if less, the value of
the member’s benefits (other than
transferred in pension rights or AVCs /
SCAVCs) where the obligation was as a
result of a criminal, negligent or fraudulent
act or omission in connection with the
employment and as a result of which the
person has left the employment.
The council will exercise this discretion. After considering each case on its
individual merits, the council may recover from Strathclyde Pension Fund
the amount of loss in cases of criminal, negligent or fraudulent acts by a
member.
A70(2) & (3) Whether to recover from the fund any
financial loss caused by fraudulent offence or
grave misconduct of an employee(who has
left because of that) or amount of refund if
less
The council will exercise this discretion. After considering each case on its
individual merits, the council may recover from Strathclyde Pension Fund
the amount of loss caused by fraudulent offence or grave misconduct of the
employee (who has left because of that) or the amount of refund if less.
B11(2) Whether to allow a member to select a final
pay period for fees to be any three
consecutive years ending with 31st March in
the 10 years prior to leaving.
The council will allow a member to select final pay for fees to be any three
consecutive years ending 31st March in the 10 years prior to leaving. The
council agree that this will automatically be done by SPF.
B30(5)* Whether to waive, on compassionate
grounds, the actuarial reduction applied to
deferred benefits paid early
The council will exercise this discretion and may consider waiving the
actuarial reduction on compassionate grounds with each case considered
on its merits taking into account costs to the council, impact on service
delivery and the particular circumstances of the individual. 
156

Page 157

OFFICIAL
OFFICIAL
15 
TABLE 4 
The following table details our discretions under the Local Government Pension Scheme 
(Scotland) Regulations 1998 (as amended) in relation to pre 01 04 09 scheme leavers. 
Regulation Discretion South Lanarkshire Council’s policy on the exercise of this discretion
30 (5)* Waive, on compassionate grounds, the
actuarial reduction applied to benefits paid
early for a post 
31 03 98 / pre 01 04 09 leaver Note: any
resultant strain cost from the exercise of this
discretion will be charged to the employer
regardless of the member’s age at date of
retirement
The Council will exercise this discretion and will consider each case on its
individual merits, taking into account costs to the council, impact of 
service delivery and the particular personal circumstances of the member. 
30 (7A)* Pre 01 04 09 optants out only to get benefits
paid from NRD if employer agrees 
The Council will exercise this discretion and will consider each case on its
individual merits, taking into account costs to the council, impact of n
service delivery and the particular personal circumstances of the member. 
33 (1)(b) Decide, in the absence from a post 31 03 98 /
pre 01 04 09 leaver of an election from 
the member within 3 months of being able to
elect, which benefit is to be paid where the
member would be entitled to a pension or
retirement grant under 2 or more regulations
in respect of the same period of Scheme
membership
The Council will exercise this discretion in partnership with SPFO.
70(7)(a) Consent to a member’s former employer
assigning to the new employer rights under
any SCAVC life assurance policy
The Council will not exercise this discretion.
157

Page 158

OFFICIAL
OFFICIAL
16 
87 (2) No right to return of contributions due to
offence of a fraudulent character unless
employer directs a total or partial refund is to
be made (pre 01 04 09 leavers)
The Council will not exercise this discretion and will not direct a return of
contributions in the event of an offence of a fraudulent character or grave
misconduct.
91 Contribution Equivalent Premium (CEP) in
excess of the Certified Amount (CA)
recovered from a refund of contributions can
be recovered from the Pension Fund
(pre 01 04 09 leavers)
The Council will not exercise this discretion.
111(2) &(5)
112(1)
Forfeiture of pension rights on issue of
Secretary of State’s certificate
(pre 01 04 09 leavers) 
Where forfeiture certificate is issued, direct
interim payments out of Pension Fund until
decision is taken to either apply the certificate
or to pay benefits (pre 01 04 09 leavers) 
The Council will exercise this discretion and will consider each case on its
merits, the Council may apply for a forfeiture certificate where a member
is convicted of a relevant offence and, following the issue of the
certificate, direct that benefits are to be forfeited.
113(2) Recovery from Fund of monetary obligation
owed by former employee or, if less, the value
of the member’s benefits (other than
transferred in pension rights)
(pre 01 04 09 leavers)
The Council will exercise this discretion in line with the national guidance
on fraud and in situations where there is no provision through other
policies. 
115(2) & (3) Recovery from Fund of financial loss caused
by employee, or amount of refund if less (pre 
01 04 09 leavers)
The Council will exercise this discretion in line with the national guidance
on fraud and in situations where there is no provision through other
policies. 
158

Page 159

OFFICIAL
OFFICIAL
17 
TABLE 5 
The following table details our discretions under the Local Government (Discretionary Payments and Injury Benefits) (Scotland) Regulations
1998 (as amended)  
D 4 (1) Power to increase statutory redundancy
payments above statutory weekly pay limit
South Lanarkshire Council will exercise this discretion as set out in the
early retirement and voluntary severance guidance. Redundancy
payments will be based on actual weeks’ pay. 
D 8(1) Decision on whether to award compensatory
added years to an individual on retirement on
efficiency / redundancy Grounds
The Council will exercise this discretion and will award the maximum
enhancement of up to 6 2/3 years on redundancy grounds and up to 10
years on efficiency grounds as set out in the early retirement and
voluntary severance guidance. 
D 35 Decision to award up to 104 weeks
compensation instead of compensatory added
years
The Council will exercise this discretion and will award lump sum
compensation of up to 66 weeks’ pay in cases of redundancy or
termination of employment on efficiency grounds instead of CAY as set
out in the early retirement and voluntary severance guidance. 
159

Page 160

160

Page 161

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee 
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Review of Procurement Strategy for 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on progress in the Procurement Strategy Action Plan to March
2025
 present the annual review of the Procurement Strategy for 2025/2026
 present the Procurement Strategy Action Plan for 2025/2026
[1purpose]
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report be noted.
1recs]
3. Background
3.1. The Council’s Procurement Strategy 2023 to 2028 was approved by Executive
Committee on 17 May 2023. 
3.2. In accordance with the Procurement Reform (Scotland) Act 2014, the Council must
carry out an annual review of the Procurement Strategy.   Progress on the delivery of
the associated action plan is also reported at six monthly intervals to Finance and
Corporate Resources Committee. 
4. Procurement Strategy and Action Plan Update 2023/2024
4.1. The Procurement Strategy 2023 to 2028 included seven key strategic objectives,
which linked to key outcomes for the Procurement Service.  An update on each of
these objectives and evidence of progress in working towards these outcomes is
included in Appendix 1 with highlights included below:- 
 implementation of new procurement and purchasing arrangements under Oracle
Fusion, including electronic authorisation of contracts
 continuation of the Council’s Procured Spend Review project, with efficiencies of
£0.9 million approved in the 2025/2026 budget
 increased level of spend with local enterprises in the 6 months to September
2024, with annual performance to be confirmed
 delivery of payment of Living Wage in all Social Care contracts, uplifted in April
2024 
4.2. The Procurement Strategy Action Plan included specific projects for 2024/2025, in
support of the strategic objectives.  An update on progress across each of the
actions to the end of March 2025 is provided in Appendix 2. 
13
161

Page 162

4.3. A total of 8 actions were included in the action plan for 2024/2025, all of which are
complete, with highlights below:- 
 Oracle Fusion Procure to Pay functions successfully implemented with new
operating model for payables and purchasing from April 2024
 progress in embedding climate sustainability in procurement, including Resource
training on sustainable procurement guidance
 implement improved Community Benefit monitoring and outcomes through new
Cenefits software, including reporting on Community Benefits in Procurement
Annual Report 
5. Procurement Strategy 2020 to 2023 review
5.1. The Council is required to review the Procurement Strategy annually and this is the
second annual review of the Procurement Strategy 2023 to 2028.   The updated
Strategy is included in Appendix 3. 
5.2. The key strategic objectives, listed below, have been reviewed and updated to reflect
current priorities and emerging issues:- 
 Compliance
 Value for Money
 Collaboration
 Contract and Supplier Management
 Fair Work First
 Sustainable and Ethical
 Community Wealth Building 
5.3. A number of strategic objectives have been expanded during this review period,
including:- 
 Sustainable Procurement: aiming to move to Level 4 in Process and Reporting
from current performance at Level 3.
 Contractor and Supplier Management: contribute to the Council’s commitment to
the Armed Forces Covenant and Breastfeeding Friendly Scotland by encouraging
suppliers to participate in the schemes. 
 Contractor and Supplier Management: ensure the Council’s obligations under the
Safe Staffing Act 2019 are included in all relevant contracts. 
6. Procurement Strategy Action Plan 2025/2026
6.1. Appendix 4 details the Procurement Strategy Action Plan proposed for 2025/2026. 
6.2. These specific actions contribute towards the achievement of the procurement
strategic objectives and include:- 
 continued focus on procurement compliance, reflecting the new arrangements
under Oracle Fusion
 introduction of whole life costing process for appropriate contracts
 update sourcing strategy and tender documentation for the Safe Staffing Act,
Armed Forces Covenant and Breastfeeding Friendly scheme 
7. Employee Implications
7.1. There are no employee implications. 
162

Page 163

8. Financial Implications
8.1. There are no direct financial implications associated with this report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The Procurement Service are working with the Scottish Government’s Sustainable
Toolkit, which aims to embed sustainable procurement into the Council’s
procurement processes and monitors progress in achieving the Sustainable
Procurement Duty, including Climate Change objectives. 
10. Other Implications
10.1.  The Procurement Reform (Scotland) Act 2014 requires any public organisation,
which has an estimated total annual value of regulated procurement spend of
£5 million or more, to prepare and publish a Procurement Strategy.   An organisation
must also review its Procurement Strategy annually and make such revisions as it
considers appropriate for the purposes of the Act.   The risk of non-compliance is
mitigated by the proposals in this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. There is no requirement to carry out an equality impact assessment in terms of the
proposals contained within this report. 
11.2. Consultation on the revised Procurement Strategy and Procurement Strategy Action
Plan for 2025/2026 has been carried out with the Procurement Network and all
Resource Heads of Service. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
12 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Procurement Strategy 2023 to 2028, Executive Committee 17 May 2023
 Procurement Strategy review 2024/2025 Finance and Corporate Resources Committee
22 May 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Name: Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951 (Tel:  01698 454951)
E-mail: craig.fergusson@southlanarkshire.gov.uk 
163

Page 164

Appendix 1 
Procurement Strategy 2023-2028 Key Objectives 
Objective Aim Outcome Progress Assessment of
progress
Compliance Ensure compliance with
Procurement Regulations and
the Council’s Standing Orders
on Contracts
Improve compliance
and mitigate risk of
contract challenge 
Procurement continues to monitor
compliance with regulations and
Standing Orders on Contracts
across the Council, as evidenced by
• Implementation of new
procurement and purchasing
arrangements under Oracle
Fusion, including electronic
authorisation of contracts. 
• Action plan to address
compliance issues across
specific targeted areas
Satisfactory 
Value for
Money
To secure Best Value,
balancing cost and quality of
service and support the Council
in achieving budget savings 
Improved Value for
Money in support of the
Council's Financial
Strategy
We continue to work with Resources
in recognising demand and cost
drivers and identifying opportunities
for efficiencies, as evidenced by:
• Procured Spend review under
Council’s Transformational
Review Programme
• Management of price increase
requests given inflationary and
eNIC pressures. 
Satisfactory 
Collaborative Identify and influence
collaborative opportunities to
work with public partners and
drive value through the power of
public sector procurement
Improved levels of
collaborative activity
and delivery of
efficiencies 
We continue to engage with
procurement partners to identify
collaborative opportunities and
influence development of
Satisfactory 
164

Page 165

collaborative working, as evidenced
by: 
• 90% participation in Scotland
Excel frameworks
• Positive engagement with Scottish
Procurement Alliance,
Procurement for Housing and Hub
South West 
Contract and
Supplier
Management
Support Resources to take a
proactive approach to contract
and supplier management to
achieve innovation and value in
contract delivery 
Ensure suppliers meet
contractual obligations,
drive improvements in
supplier performance
and achieve efficiency
improvements 
We can demonstrate an improved
approach to contract and supplier
management, as evidenced by:
• Improved levels of engagement
with Social Care providers 
• Development of new electronic
performance appraisal
arrangements in Oracle Fusion. 
• Increased engagement to drive
value in contracts through
Procured Spend Review
Satisfactory
Fair Work First Work with suppliers to improve
Fair Work First, including
payment of the Living Wage and
compliance with Council
Charters 
Improved Fair Work
First and Living Wage
for those involved in
delivery of Council
contracts 
We continue to promote Fair Work
First and payment of the Living
Wage, as evidenced by:
• Annual confirmation of payment of
Living Wage in all Social Care
contracts
• Continued focus on Fair Work
First recommendations from
Scottish Government included in
all appropriate tenders. 
Satisfactory 
Sustainable
and Ethical
Secure wider social, economic
and environmental benefits
through contracts as set out in
Meet the Sustainable
Procurement Duty 
Procurement continues to self-
assess progress using the Scottish
Government’s Flexible Framework to
Satisfactory 
165

Page 166

the Sustainable Procurement
Duty 
assess the organisational approach
to sustainable procurement. 
• Rollout of sustainable
procurement training to Resource
contract managers.
• Training for procurement team on
Whole Life Costing.  
Community
Wealth
Building
Support and encourage the
local economy to grow
sustainably through the effective
use of procurement to develop
local communities and
maximise use of Community
Benefits 
Ensure the spending
power of the Council
and Community
Benefits contribute
towards Community
Wealth and achieve
National Outcomes 
Procurement contributes to the local
spend pillar under the Community
Wealth Building Strategy, as
evidenced by: 
• Demonstrating increased levels of
local spend to September 2024
(with publication of performance
to April 2025 to follow).
Satisfactory 
166

Page 167

Appendix 2 
Procurement Strategy Action Plan 2024/2025 to 31 March 2025 
Action  Strategic
Objective  Responsibility Timescale Status Update
Sustainable Procurement toolkit
progress: update Flexible Framework 6
monthly: aiming to move to Level 3 in
People, Process, Stakeholders and
Reporting from current performance at
Level 2. 
Sustainable and
Ethical
Procurement  31 March
2025
Complete Achieved Level 4 in People
and Strategy and Level 3 in
Process, Stakeholders and
Reporting.
Implement improved Community Benefit
monitoring and outcomes through new
Cenefits software, including reporting on
Community Benefits in Procurement
Annual Report. 
Sustainable and
Ethical /
Community
Wealth Building
Procurement /
Resources
31 March
2025 
Complete Cenefits software successfully
implemented and monitoring
information on Community
Benefits available for
Procurement Network, CMT
and Procurement Annual
Report.
Progress the action plan for the Spend
Pillar to support the delivery of the
objectives of the Community Wealth
Building strategy.  
Community
Wealth Building 
Procurement /
Economic
Development 
31 March
2025 
Complete Achieved procurement actions
on Community Wealth
Building Action Plan, with local
spend performance indicator
to be confirmed for 24/25.
Continue to monitor the impact of new
Fair Work First framework and monitor
Scottish Government guidance on
Living Wage. 
Fair Work First Procurement  31 March
2024
Complete Fair Work First standards and
Living Wage guidance
embedded in appropriate
contracts.
Continue to monitor the implications of
introduction of National Care Service on
Social Care commissioning
arrangements. 
Contract and
Supplier
Management
Procurement and
H&SCP
31 March
2025
Complete No longer required, given
Scottish Government decision
to remove Care Service from
the Bill, although new
commissioning obligations
under the Bill will continue to
be monitored
167

Page 168

Appendix 2 
Procurement Strategy Action Plan 2024/2025 to 31 March 2025 
Monitor impact of Oracle Fusion
implementation on Procure to Pay
functions, including achievement of
system efficiencies in restructured
payables and purchasing operating
model and efficiencies from electronic
workflow processes across Resources. 
Compliance Procurement 31 March
2025
Complete Implementation of Procure to
Pay functions have
progressed well in the first
year of Oracle Fusion
following go live in April 2024.
Efficiencies have been
achieved as targeted in the
operating model.
Implement new Oracle Fusion electronic
workflow performance appraisal function
to support Resource contract
management.
Contract and
Supplier
Management 
Procurement and
Resources
31 March
2025
Complete Performance appraisal
functionality developed, and
priority contracts scheduled
from April 2025.
Rollout of Oracle Fusion supplier portal
to transform supplier engagement with
Procure to Pay processes to electronic
self-serve access.  
Contract and
Supplier
Management 
Procurement 31 March
2025
Complete Successful adoption of first
tranche of suppliers accessing
self-serve purchasing and
invoicing completed. 
168

Page 169

Appendix 3 
Procurement Strategy 2023-2028 
Annual review 2025/2026 
If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk 
169

Page 170

170

Page 171

Contents 
Section 1
Introduction by Executive Director of Finance and Corporate Resources 
Section 2 
National and local context 
Section 3
Purpose and delivery of the Strategy 
Section 4
Strategic objectives 
171

Page 172

Section 1: Introduction by Executive Director of Finance and Corporate Resources 
This Strategy sets out the vision for council procurement for 2023-2028, demonstrating our
commitment to achieving value for money and contributing to national and local priorities. 
The council’s vision is to “improve the quality of life for everyone in South Lanarkshire”
and the works, supplies and services procured by the council have a direct impact on delivery of
our services, from social care and educational supplies to new build housing. 
The council’s spending power can play a key role in influencing a more prosperous and
sustainable South Lanarkshire, including promoting jobs and growth, fair work and tackling climate
change. 
Our aim is to build on achievements delivered by the council’s previous procurement strategies
and embed the principles of public procurement: equal treatment, transparency, competition and
accountability.  
This strategy will be reviewed annually, and our outcomes monitored in the annual procurement
report. The strategic objectives will promote best practice in procurement activity across the
council, supporting delivery of high quality, sustainable and efficient services from our suppliers. 
Economic conditions continue to be challenging, with significant supply chain and inflationary
pressures impacting on the council’s budgets for works, goods and services. Procurement will
continue to support the council and our local economy during these economic circumstances and
our strategic objectives reflect the wider remit for public procurement in responding to the Climate
Change Emergency and Community Wealth Building. We will continue to focus on delivery of
quality and value for money procured services while supporting local supply chains and quality
employment opportunities. 
Jackie Taylor
Executive Director of Finance and Corporate Resources
South Lanarkshire Council 
172

Page 173

Section 2: National and Local context 
Public sector procurement in Scotland is valued at more than £11 billion per annum and the profile
and remit of procurement activity continues to evolve and change. 
The overarching aim of public sector procurement continues to be delivery of public value, as set
out in the Scottish Model of Procurement below: 
The council operates within the Scottish Government’s Procurement Journey, which ensures
openness and transparency in our approach and clarity for stakeholders and suppliers. 
The National Performance Framework sets out how local government can contribute to
achievement of National Outcomes. The framework aims to implement sustainable procurement
and obliges the council to consider how procurement will improve society, the economy and
communities under the Sustainable Procurement Duty. 
173

Page 174

Local Priorities 
The council’s procurement strategy allows the council to set out how procurement activity will
contribute to the council and Community Planning Partnership’s wider priorities and objectives, as
set out in the council plan "Connect". Procurement is at the centre of the council’s Value of being
“accountable, effective, efficient and transparent” and contribute to many of the council’s strategic
outcomes, including: 
Thriving business, fair jobs and vibrant
town centres
Caring, connected,
sustainable communities
Good quality, suitable and sustainable
places to live
People live the healthiest
lives possible
174

Page 175

Our Spend Profile 
The council spends in the region of £350m on externally procured goods, supplies and services
annually, with significant areas of expenditure including social care (£118m and construction and
property (£103m)). 
34%
30%
6%
6%
6%
3%2%
13%
South Lanarkshire Council
Annual Procured Spend
Social Care
Construction and Property
Waste & Environmental Services
ICT
Transport and Vehicles
Utilities
Food
Other
175

Page 176

Section 3: Purpose and Delivery of Strategy 
Purpose of Strategy 
Under the Procurement Reform (Scotland) Act 2014, the council is required to publish a
procurement strategy and review the objectives and outcomes annually. 
The strategy should establish the council’s strategic approach to procurement, setting out how we
will deliver value for money and support delivery of national outcomes and the objectives set out in
the council’s strategic plan. 
The council must also demonstrate how we will deliver the wider social, economic and
environmental aims of procurement, as required by the sustainable procurement duty, while
ensuring compliance with statutory duties and the council’s Standing Orders on Contracts. 
The purpose of our procurement strategy is to: 
• Set out clear objectives and provide a monitoring framework for reporting on our
achievements and outcomes. Our strategic objectives are set out in Section 4. 
• Focus on people, processes and systems to deliver an effective and continually improving
procurement service. 
Contracting Activity  
The council awards around 200 contracts above £50,000 each year, working within procurement
regulations and our own Standing Orders on Contracts to ensure a compliant approach to
contracts. We focus on open and connected procurement by publishing our Procurement Strategy
and our forward plan of future opportunities is published in the Annual Procurement Report and
Contract Register. 
We work with a range of collaborative partners in accessing framework opportunities, including
Scotland Excel, Procurement for Housing, the Scottish Procurement Alliance, Crown Commercial
Services and Hub South-West. 
The Procurement Service seek continual improvement with the Procurement and Commercial
Improvement Programme, where we are currently ranked in the highest performance band and
have developed a quality in house Trainee Procurement Officer graduate programme to develop
talent and grow professional capacity. 
Strategic Objective 1 and 3 
176

Page 177

Our Stakeholders 
Procurement works closely with both internal and external stakeholders to ensure works, goods
and services are procured in accordance with strategic objectives to support the Council in
delivering community services. Where appropriate, procurement arrangements will be determined
by consultation feedback from community partners. 
Value for Money 
In responding to challenging economic conditions, Procurement is focused on supporting the
Council to deliver Value for Money by: 
• Working closely with Resources in specifying works, goods and services and embedding a
demand management approach. 
• Ensuring an open and competitive tendering approach to maximise value.
• Working with collaborative partners to maximise public spending power. 
Strategic Objective 2 
Community
To support delivery of Council
services to communities and
contribute to positive economic
growth, employment outcomes
and net zero targets 
Suppliers
Positive contract management
approach with all suppliers and
engagement with local SMEs
and Supported Businesses for
tender opportunities 
Colleagues 
Working with Council Resources
and collaborative partners to
deliver works, goods and
services 
177

Page 178

Supplier Engagement 
We are open and transparent in tendering activity and are committed to improving engagement
with local SMEs and Supported Businesses under the council’s Community Wealth Building
Strategy. This is a key strategic objective in supporting inclusive growth and fair employment
opportunities: working closely with our partners in Economic Development and the Supplier
Development Programme. 
The council has a number of performance measures in relation to supplier engagement and these
are published in the Annual Procurement Report: 
• core trade spend with local enterprises 
• core trade spend across Lanarkshire and Glasgow City Region
• payment of contractors and sub-contractors within 30 days 
Strategic Objective 4 and 7 
Supplier Engagement 
Public Contracts Scotland
Tender Opportunities 
•Meet the Buyer events 
•Talking Tenders
•Pre-tender events
•Build Lanarkshire
•Prior Information Notices
•Market Engagement
•Contract Notices
•Award Notices
•Contract Register
•Annual Procurement Report
•Social Media 
178

Page 179

Fair Work First and Real Living Wage 
The council assesses all appropriate contracts in accordance with the Scottish Government’s
seven Fair Work First criteria, being: 
• Appropriate channels for effective voice, such as trade union recognition
• Investment in workforce development
• No inappropriate use of zero hours contracts
• Action to tackle the gender pay gap and create a more diverse and inclusive workplace 
• Providing fair pay for workers, including payment of the Real Living Wage
• Offer flexible and family friendly working practices for all workers from day one of
employment
• Oppose the use of fire and rehire practices 
The council encourages the payment of Living Wage in contracts and evaluates this as part of Fair
Work First and continues to monitor Scottish Government guidance on Living Wage. 
Strategic Objective 5 
Sustainable Procurement Duty and the Sustainable Procurement Tools 
The Council recognises the key links between our Sustainable Development and Climate Change
Strategy and the Sustainable Procurement Duty. This places a duty on each procurement process
to consider how to improve the economic, social, and environmental wellbeing of the authority's
area, facilitate the involvement of small and medium enterprises, third sector bodies and
supported businesses in the process, and promote innovation. 
The Council works with the Scottish Government’s Sustainable Procurement Tools to optimise the
economic, social and environment outcomes of procurement activity.   
Strategic Objective 6 
Flexible
Framework
• Continuous assessment of how effectively sustainable
procurement duty is embedded within the
organisation
Prioritisation
Tool
• Identifies risks and opportunities for sustainable
procurement at category level and establishes
sustainable priorities in future tendering activity
Sustainabilit
y Test
• Determines sustainable procurement outcomes at
individual tender level, including life cycle mapping
179

Page 180

Procurement of Food 
The Procurement team work closely with Council services who procure food and drink to ensure
contractual arrangements are sustainable, reliable and meet nutritional standards while delivering
Best Value. In the coming years, the Council will also develop its Local Good Food Nation Plan as
part of the requirements of the Good Food Nation (Scotland) Act 2022 and the role of public
procurement of food in becoming a Good Food Nation will be considered.   
Strategic Objective 6 
Community Benefits 
The Council seeks to maximise Community Benefits and will consider inclusion of Community
Benefits in all suitable contracts above £50,000. We have developed a points menu to ensure that
Community Benefits offered are commensurate with the value and term of the contract. Delivery of
Community Benefits committed are monitored to maximise the positive impact on our
communities. 
Our range of Community Benefits prioritises support for training and employment and support for
young people and community groups. The council has a Community Wish-List process in place to
match community requirements with contractual opportunities. 
Strategic Objective 7
Ensure that the council
prepares, serves and promotes
enjoyable, healthy and
sustainable food in council
properties and schools by
seeking to meet the Soil
Association Food for life
standards
Engage with partners and
the private sector to
explore and research
opportunities to
improvement public
procurement of food,
including in relation to the
provision of local food
Connect with the
community, partners and
the private sector to reduce
the impacts of the food
system on the environment
and its contribution to
climate change and
promote animal welfare
180

Page 181

Section 4: Strategic Objectives 
The council has identified seven strategic objectives to support the Procurement Strategy. In this
section, we set out how we will achieve each objective and what our target outcome will be. 
Compliance 
Value for
Money 
Collaboration 
Contract and
Supplier
Management 
Fair Work First 
Sustainable and
Ethical 
Community
Wealth Building
181

Page 182

Objective 1: Compliance 
Aim: Ensure compliance with Procurement Regulations and the council’s Standing Orders
on Contracts 
How to achieve 
• Be open and transparent in our approach and monitor awareness of, and compliance with,
Standing Orders and regulations. 
• Procurement team members are capable, confident and empowered to support
procurement activity across categories. Drive improvement in Procurement Team capability
through the Scottish Procurement Competency Framework
• Continue to invest in Trainee Procurement Officer Programme to develop professional
future capacity.
• Procurement processes and systems are efficient, cohesive, streamlined and fit for
purpose.
• Monitor non-contractual spend and work with Resources to improve compliance.
• Monitor performance against target of paying invoices within 30 days. 
• Quarterly meetings of the council’s Procurement Network to develop and
review processes to ensure consistent standards council wide. 
• Aim for continual improvement in Scottish Government’s Procurement and Commercial
Improvement Programme.
• Develop the council’s Oracle Fusion system to secure improvements in procure to pay
processes.
• Ensure appropriate controls in place to identify and prevent procurement fraud in
accordance with the Council’s Counter Fraud, Bribery and Corruption Policy. 
Outcome: Improve compliance and mitigate risk of contract challenge and prevent fraud. 
Objective 2: Value for Money 
Aim: To secure Best Value, balancing cost and quality of service and support the council in
achieving budget savings 
How to achieve 
• Support Resources in contract management, in recognition of challenging supply markets
and inflationary pressures.
• Recognise demand and cost drivers and work with Resources in identifying opportunities
for efficiencies.
• Implement principles of demand management, starting with “whether to buy” before “what
to buy and how to buy”.
• Implement Whole Life Costing approach to embed sustainability in long term value
decisions. 
Outcome: Improved Value for Money in support of the council’s Financial Strategy 
Objective 3: Collaboration 
Aim: Identify and influence collaborative opportunities to work with public partners and
drive value through the power of public sector procurement 182

Page 183

How to achieve: 
• Engage with procurement partners to identify collaborative opportunities and influence
development of collaborative working.
• Collaborative partners include Scotland Excel, Scottish Procurement Alliance, Procurement
for Housing and Crown Commercial Services. 
• Make an active contribution to the design of collaborative arrangements to reflect the
Council’s objectives. 
Outcome: Improved levels of collaborative activity and delivery of efficiencies 
Objective 4: Contract and Supplier Management 
Aim: Support Resources to take a proactive approach to contract and supplier
management to achieve sustainability, innovation and value in contract delivery 
How to achieve
• Engage with suppliers to monitor contract performance and drive improvements and
efficiencies.  
• Influence suppliers to contribute to climate change and sustainability targets.  
• Implement electronic process for contract and supplier management.
• Encourage suppliers to participate in the Armed Forces Covenant and Breastfeeding
Friendly Scotland schemes
• Ensure Council’s obligations under the Safe Staffing Act 2019 are included in all relevant
contracts 
Outcome: Ensure suppliers meet contractual obligations, drive improvements in supplier
performance and achieve efficiency improvements. 
Objective 5: Fair Work First 
Aim: Work with suppliers to implement Fair Work First standards, including payment of the
Real Living Wage and compliance with council Charters. 
How to achieve 
• Assess Fair Work First and Real Living Wage in all appropriate contracts. 
• Monitor compliance with Construction Charter, Ethical Care Charter and Fair Tax Charters
adopted by the council. 
Outcome: Improved Fair Work Practices and Real Living Wage for those involved in delivery of
council contracts 
Objective 6: Sustainable and Ethical  
Aim: Secure wider social, economic and environmental benefits through contracts as set
out in the Sustainable Procurement Duty 
How to achieve
183

Page 184

• Support the council’s response to the Climate Change Emergency by improving
environmental outcomes from procurement, including net-zero and carbon reduction plans.
• Embed sustainability measures in procurement through use of Scottish Government’s
Sustainability Tools and life cycle costing in appropriate contracts.
• Require supply chain transparency from contractors to ensure appropriate ethical
standards, Modern Slavery and avoid use of sanctioned countries and individuals. 
• Work with Police Scotland in prevention of Fraud and Disruption of Serious and Organised
Crime in all appropriate contracts.
• Promote the highest standards in food procurement, including consideration of animal
welfare standards, in our supply chains and in accordance with the Council’s Good Food
Strategy 
Outcome: Meet the Sustainable Procurement Duty 
Objective 7: Community Wealth Building 
Aim: Support and encourage the local economy to grow sustainably through the effective
use of procurement to develop local communities and maximise use of Community
Benefits 
How to achieve
• Expand the capability of local businesses and social enterprises to bid for public sector
contracts with support from Economic Development and the Supplier Development
Programme. 
• Build on our knowledge of market supply through further analysis of local capacity to
identify new opportunities for local business to grow.
• Increase levels of pre-market engagement before commissioning to shape the preparation
of tender requirements and prepare potential local bidders. 
• Increase promotion of tender opportunities to local sectors 
• Encourage local suppliers to bid for Scotland Excel contract opportunities to increase local
business share of collaborative contract spend by all Scottish public bodies.  
• Work with anchor institutions to explore further opportunities for more local spend
• Maximise our approach to Community Benefits, including delivery of Community Wish List.
• Ensure contractors deliver social investment where appropriate.
• Review procurement practices to deliver more local spend where possible. 
Outcome: Ensure the spending power of the council and Community Benefits contribute
towards Community Wealth and achieve National Outcomes 
184

Page 185

Monitoring Framework 
Delivery of the procurement strategy will be supported by an annual action plan. Each year the
annual plan will be reviewed with new actions identified relevant to delivery of the strategic
objectives. 
A reporting and monitoring framework ensure high levels of governance surround the delivery of
the procurement strategy, as follows: 
Annual review of the Procurement Strategy and six monthly update on strategic action plan
reported to Committee. 
Procurement Update, including strategic action plan, Performance Indicators and High-Risk High
Value projects reported to the council’s Corporate Management Team six monthly. 
Review of Sustainable Procurement Flexible Framework six monthly. 
Annual service planning exercise to plan procurement activity with Resources for the forthcoming
year. 
Resource committee reports on Contracts Awarded every six months in accordance with Standing
Orders on Contracts 
Annual Procurement Report published annually in accordance with legislative requirements and
approved by Committee. 
Open and Transparent publication of the council’s Contract Register.
185

Page 186

186

Page 187

Appendix 4
Procurement Strategy Action Plan 2025/2026
Action  Strategic Objective  Responsibility Timescale
Sustainable Procurement toolkit progress: update Flexible Framework 6
monthly: aiming to move to Level 4 in Process and Reporting from current
performance at Level 3. 
Sustainable and Ethical Procurement  31 March 2026
Progress introduction of Whole Life Costing approach  Sustainable and Ethical Procurement  31 March 2026
Continue to monitor Community Benefit outcomes through Cenefits
software, including reporting to Procurement Network, CMT and in
Procurement Annual Report. 
Sustainable and Ethical /
Community Wealth Building
Procurement /
Resources
31 March 2026 
Progress the action plan for the Spend Pillar to support the delivery of the
objectives of the Community Wealth Building strategy.  
Community Wealth Building  Procurement /
Economic
Development 
31 March 2026 
Continue to monitor and respond to Scottish Government guidance on
Living Wage. 
Fair Work First Procurement  31 March 2026
Continue to drive contractual and spend compliance through Oracle
Fusion utilising electronic workflow processes across Resources. 
Compliance Procurement 31 March 2026
Monitor impact of new Oracle Fusion electronic workflow performance
appraisal function to support Resource contract management.
Contract and Supplier
Management 
Procurement and
Resources
30 September 2025
Continued rollout of Oracle Fusion supplier portal to transform supplier
engagement with Procure to Pay processes to electronic self-serve
access.  
Contract and Supplier
Management 
Procurement 31 March 2026
Contribute to the Council’s commitment to the Armed Forces Covenant
and Breastfeeding Friendly Scotland by encouraging suppliers to
participate in the schemes. 
Contract and Supplier
Management
Procurement 30 September 2025
Ensure sourcing strategy and tender documents comply with new
requirements of Safe Staffing Act 2019
Contract and Supplier
Management
Procurement and
Legal
30 September 2025
To support the procurement requirements for the Council’s strategic
investment programme
Compliance Procurement 31 March 2026
Review of the approach to procurement service planning  Compliance  Procurement  31 December 2025 
187

Page 188

188

Page 189

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Notification of Contracts Awarded:  1 October 2024 to
31 March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee, in accordance with Standing Orders on
Contracts, of contracts awarded by Finance and Corporate Resources during the
period 1 October 2024 to 31 March 2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that details of the contracts awarded be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts
that details of the acceptance of all tenders above £50,000 be reported
retrospectively to the relevant Committee for noting, other than those under Clause
21.3 where the award is not the lowest in a price only tender, or costs exceed the
approved financial provision.  In these instances, a report is submitted to the
appropriate Committee and subsequent authority to award is granted by that
Committee. 
4. Contract Awards
4.1. The details of contracts awarded for the period 1 October 2024 to 31 March 2025, on
the basis of lowest offer and/or most economically advantageous offer submitted, is
provided at Appendix 1. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. Appropriate budget provision is in place for all contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information presented in this report.  
14
189

Page 190

8. Other Implications
8.1. There are no direct risks or implications for sustainability in terms of the information
contained in this report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Value:  Accountable, effective, efficient and transparent 
Previous Reference
 Finance and Corporate Resources Committee, 29 January 2025 
List of Background Papers
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.UK 
190

Page 191

Appendix 1
Contracts Awarded by Finance and Corporate Resources over £50,000 in value 
Contract
Reference
Number
Contract Description Provider Name Value Start Date End Date Extension
Date
Contract
Award Date
SLC/PS/FINCOR/
20/114/DA1 Employability Academy South Lanarkshire College £420,000 01-Oct-2024 30-Sep-2025 30-Sep-2026 26-Sep-2024
SLC/FC/23/016 Legal Case Management System Civica UK Ltd £179,973 30-Sep-2024 29-Sep-2029 29-Sep-2031 26-Sep-2024
SLC/CE/24/031
Advice Pro Case Management System
Licenses Software and Support
(Employability)
Advanced Case Management
Solutions £117,249 01-May-2023 30-Apr-2026 30-Apr-2028 12-Oct-2024
SLC/FC/23/106
Provision of Moving and Assisting
Training NHS Lanarkshire £332,611 28-Oct-2024 27-Oct-2027 27-Oct-2029 17-Oct-2024
SLC/FC/24/089 Oracle CRM Support Oracle Corporation UK Ltd £65,714 01-Sep-2024 31-Aug-2026 - 14-Nov-2024
SLC/FC/24/067
Mobile Device Management - Omnissa
Workspace ONE Computacenter (UK) Ltd £130,200 29-Jan-2025 28-Jan-2026 - 04-Dec-2024
SLC/FC/24/097
HR Support – HCM Hypercare and
Redwood Implementation Helen Kane HCM Limited £86,100 01-Nov-2024 31-May-2025 31-Aug-2025 06-Dec-2024
SLC/FC/24/102 Exor Roads Management Support Bentley Systems (UK) Ltd £197,315 25-Jan-2025 31-Dec-2025 - 16-Dec-2024
SLC/FC/24/108
Civica Tranman Fleet Management
System Civica UK Ltd £165,340 01-Aug-2023 30-Sep-2028 30-Sep-2029 07-Jan-2025
SLC/FC/24/101 Procured Spend Review  
Renfrewshire Council (Scotland
Excel) £200,000 27-Jan-2025 26-Jan-2027 - 23-Jan-2025
SLC/FC/23/008
Educational Digital Futures –
Education ICT Managed Service RM Education Ltd £53,500,000 01-Oct-2025 30-Sep-2032 30-Sep-2037 03-Feb-2025
SLC/FC/24/074 Oracle - Technical Support Services Oracle Corporation UK Ltd £189,261 06-Apr-2025 05-Apr-2026 - 20-Feb-2025
SLC/FC/24/105
Cloud Hosted Process Mapping
Software Engage Process Ltd £92,433 01-Mar-2025 29-Feb-2028 - 25-Feb-2025
SLC/FC/24/015 Security for Council Offices Securigroup services Ltd £169,284 01-Apr-2025 30-Sep-2025 31-Mar-2026 04-Mar-2025
SLC/FC/24/119
Lease Accounting and Portfolio
Management System Softcat plc £68,618 19-Mar-2025 25-May-2028 25-May-2029 13-Mar-2025
SLC/FC/23/043 IT Service Management System IFS UK Ltd £160,000 01-Mar-2025 28-Feb-2027 - 17-Mar-2025
SLC/FC/24/103
ConSol Annual Maintenance and
Technical Support Fujitsu Services £224,030 01-Apr-2025 31-Mar-2026 - 24-Mar-2025  
191

Page 192

Contract Extensions for contracts over £50,000 in value 
Contract Reference
Number Contract Description Provider Name Value Extension
Value Start Date End Date Extension
Date
SLC/FC/23/045
IT Project Manager - Capita
Consultancy Gravitas Recruitment Group Ltd £155,250 £51,750 22-Dec-2023 22-Jun-2025
13-Oct-
2024
SLC/SW/23/099 Assistive Technology Installation
Care & Repair in South
Lanarkshire £296,340 £148,170 01-Dec-2023 30-Nov-2025
25-Oct-
2024
SLC/FC/23/071 Capita One IT Project Lead Gravitas Recruitment Group Ltd £270,444 £76,335 13-Dec-2023 13-Jun-2025
28-Nov-
2024
SLC/FC/23/019
IT Project Delivery Manager
(Integrated Housing & Property
Management System) Gravitas Recruitment Group Ltd £284,375 £81,250 28-Aug-2023 28-Jun-2025
28-Nov-
2024
SLC/PS/FINCOR/
20/130 Payment Acceptance Worldpay Ltd £557,500 £220,000 01-Nov-2022 31-Jan-2026
06-Feb-
2025
SLC/PS/FINCOR/
19/088
Mini Competition from SX
Provision of Debt Recovery and
Sheriff Officer Services 0619 -
Lot 1 Stirling Park & Co £198,000 £33,000 01-Apr-2020 28-Feb-2026
26-Feb-
2025
SLC/PS/FINCOR/19/003/A
Debt Management and Diligence
Services Stirling Park & Co £540,000 92,000 10-Apr-2020 31-Mar-2026
08-Mar-
2025 
192