Agenda Document Pack - Finance and Corporate Resources Committee - 29/01/2025

South Lanarkshire Council · 29 January 2025
Back to Finance and Corporate Resources Committee — 29 January 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 21 January 2025 
Dear Councillor 
Finance and Corporate Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 29 January 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Lesley McDonald (Chair), Walter Brogan (Depute Chair), Celine Handibode (Depute Chair), Joe
Fagan (ex officio), Alex Allison, Mathew Buchanan, Andy Carmichael, Maureen Chalmers, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Mary Donnelly, Grant Ferguson, Gladys Ferguson-Miller,
Graeme Horne, Martin Hose, Katy Loudon, Hugh Macdonald, Catherine McClymont, Elaine
McDougall, Mark McGeever, Richard Nelson, Mo Razzaq, John Ross, Graham Scott, Kirsty
Williams 
Substitutes
Archie Buchanan, Colin Dewar, Ross Gowland, Gavin Keatt, Susan Kerr, Ross Lambie, Martin
Lennon, Richard Lockhart, Carol Nugent, Norman Rae, Helen Toner, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Finance and Corporate Resources Committee
held on 30 October 2024 submitted for approval as a correct record.  (Copy
attached) 
5 - 12 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2024/2025 - Finance and Corporate Resources
Report dated 6 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
13 - 24 
4 Capital Budget Monitoring 2024/2025 - Finance and Corporate Resources
Report dated 6 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
25 - 28 
5 Finance and Corporate Resources – Workforce Monitoring – October and
November 2024
Report dated 8 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
29 - 36 
6 Council-wide Workforce Monitoring – October and November 2024
Report dated 8 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
37 - 58 
7 Treasury Management Activity – 2024/2025 Third Quarter Review
Report dated 6 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
59 - 66 
8 Finance and Corporate Resource Plan - Quarter 2 Progress Report
2024/2025
Report dated 10 December 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
67 - 82 
Item(s) for Decision 
9 Revenue Collection and Approval for Write Offs
Report dated 8 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
83 - 88 
Item(s) for Noting 
10  Consultation on a Proposal to Increase Scottish Social Services Council
Registration Fees
Report dated 8 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
89 - 94 
11  Early Retirement, Voluntary Severance and Switch 2
Report dated 25 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
95 - 98
2

Page 3

12  Notification of Contracts Awarded  1 April to 30 September 2024
Report dated 4 December 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
99 - 104 
Urgent Business 
13  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

FINANCE AND CORPORATE RESOURCES COMMITTEE 
Minutes of meeting held via MS Teams and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 30 October 2024 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Alex Allison, Councillor Walter Brogan (Depute), Councillor Mathew Buchanan, Councillor
Andy Carmichael, Councillor Maureen Chalmers, Councillor Andrea Cowan, Councillor Maureen
Devlin, Councillor Colin Dewar (substitute for Councillor Mary Donnelly), Councillor Grant Ferguson,
Councillor Gladys Ferguson-Miller, Councillor Celine Handibode (Depute), Councillor Graeme Horne,
Councillor Martin Hose, Councillor Katy Loudon, Councillor Hugh Macdonald, Councillor Catherine
McClymont, Councillor Elaine McDougall, Councillor Mark McGeever, Councillor Richard Nelson,
Councillor Mo Razzaq, Councillor John Ross, Councillor Graham Scott, Councillor Kirsty Williams 
Councillors' Apologies:
Councillor Margaret Cooper, Councillor Mary Donnelly, Councillor Joe Fagan (ex officio) 
Finance and Corporate Resources
J Taylor, Executive Director; K Archer, Personnel Adviser; C Fergusson, Head of Finance
(Transactions); M Husband, Head of IT Services; C Lyon, Administration Officer; E McPake, HR
Business Manager; L O’Hagan, Head of Finance (Strategy); I Strachan, Head of Administration and
Legal Services; L Wyllie, Administration Assistant 
1 Declaration of Interests 
The following interest was declared:- 
Councillor(s) Item(s) Nature of Interest(s) 
Loudon Scottish Public Pensions Agency
Consultation on the Scottish Teachers’
Pension Scheme
Member of the Scottish
Teachers’ Pension
Scheme 
2 Minutes of Previous Meeting
The minutes of the meeting of the Finance and Corporate Resources Committee held on 21
August 2024 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring 2024/2025 - Finance and Corporate Resources 
A report dated 2 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted comparing the actual expenditure for the period 1 April to 9 August 2024 and providing
a forecast for the year to 31 March 2025 for Finance and Corporate Resources. 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided at Appendix B to the report. 
As at 9 August 2024, the projected outturn position for the Resource was a breakeven position. 
2
5

Page 6

Virements were proposed to realign budgets and those movements were detailed in the
appendices to the report. 
Officers responded to a member’s question on the report. 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position, as detailed in Appendix B of the
report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference:  Minutes of 21 August 2024 (Paragraph 6)] 
4 Capital Budget Monitoring 2024/2025 - Finance and Corporate Resources 
A report dated 2 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted advising of progress on Finance and Corporate Resources’ capital programme for
2024/2025 and summarising the expenditure position at 9 August 2024. 
The revised capital programme for 2024/2025 was £3.086 million, as approved by the Executive
Committee on 7 August 2024. 
The forecast for the financial year was £3.086 million and spend to date was £1.073 million. 
The Committee decided: that the Finance and Corporate Resources’ capital
programme of £3.086 million, and expenditure to date of
£1.073 million, be noted. 
[Reference:  Minutes of 21 August 2024 (Paragraph 8)] 
5 Finance and Corporate Resources - Workforce Monitoring – July to September 2024
A report dated 10 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the following employee information for Finance and Corporate Resources for
the period July to September 2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 11 June 2024 
The Committee decided: that the report be noted 
[Reference:  Minutes of 21 August 2024 (Paragraph 9)]  
6

Page 7

6 Council-wide Workforce Monitoring – July to September 2024 
A report dated 10 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the following Council-wide employee information for the period July to
September 2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 11 June 2024 
Officers:- 
 responded to members’ questions on various aspects of the report
 undertook to provide information with regards to the occupational health figures and the
significant increases in August
 noted members’ concerns and undertook to provide further analysis and information on work
ongoing in relation to the fall in numbers of applicants for BAME and veterans compared to
last year and also in success rates 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 21 August 2024 (Paragraph 10)] 
Councillor McGeever entered the meeting during consideration of the above item of business 
7 Treasury Management Activity - 2024/2025 Second Quarter Review 
A report dated 3 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the second quarter review of Treasury Management activity for 2024/2025. 
Details were given on:- 
 market performance  management of risk
 debt management and borrowing strategy  next quarter investment plans
 investment activity  treasury management indicators 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 21 August 2024 (Paragraph 11)] 
8 Prudential Indicators, Treasury Management Activity and Annual Investment
Report 2023/2024 
A report dated 8 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the:- 
 Treasury Management Activity and Prudential Code indicators for 2023/2024
 proposed Annual Investment Report for 2023/2024  
7

Page 8

The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of Practice for Treasury
Management required the Council to prepare an annual report on its Treasury Management
activities.  The CIPFA Prudential Code required councils to prepare a series of financial indicators
that demonstrated affordability, prudence and sustainability with regard to capital financing
decisions. 
The Council’s Capital Programme included, within its funding package, planned borrowing.  The
Prudential Code provided a framework to assist the management of the financial implications and
helped to demonstrate that borrowing was both affordable and prudent. 
The Council’s Treasury Management Activity Report for 2023/2024 and the Treasury
Management and Prudential Code Indicators for 2023/2024 were attached as appendices 1 and
2, respectively, to the report. 
In terms of the Local Government Investments (Scotland) Regulations 2010, the Council was
required to prepare an Annual Investment Strategy prior to the start of each financial year and an
Annual Investment Report after the financial year end.  Both documents required to be approved
by the Council. 
The Annual Investment Strategy for 2023/2024 had covered the following areas:- 
 permitted investments
 risk management
 borrowing in advance 
The Annual Investment Report, attached as Appendix 3 to the report, detailed the Council’s
activity in each of those 3 areas for 2023/2024 and Appendix 4 detailed the permitted investments
that the Council had approved for the financial year 2023/2024. 
No borrowing in advance was taken during 2023/2024. 
The Committee decided: 
(1) that the Treasury Management Activity Report for 2023/2024 and the 2023/2024 Treasury
Management and Prudential Code Indicators be noted and referred to the Executive
Committee for noting; and 
(2) that the 2023/2024 Annual Investment Report be endorsed and referred to the Executive
Committee for endorsement prior to submission to the Council for formal approval in line
with The Local Government Investments (Scotland) Regulations 2010. 
9 Scottish Public Pensions Agency Consultation on the Scottish Teachers’ Pension
Scheme 
A report dated 10 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the Scottish Public Pensions Agency Consultation on the Scottish Teachers’
Pension Scheme. 
The Scottish Teachers’ Pension Scheme (STPS) continued to be an integral part of the
remuneration package for teachers in Scotland and offered the security of a guaranteed income
in every year or retirement for its members. 
Membership of the scheme was provided for individuals employed by a participating employer,
predominantly in a teaching role.  Participating employers included local authorities, colleges,
universities, independent and special schools.  
8

Page 9

The consultation document sought views on proposals to prospectively amend the eligibility
criteria for membership of the STPS and aimed to provide clarity on who could be a member of
the scheme.  The consultation was for a period of 12 weeks, from 23 August to 15 November
2024. 
In preparing the Council’s proposed response, views had been sought from Personnel Services
and Education Resources. 
The key areas covered in the proposed response were detailed in Section 4.2 of the report and
the full proposed response was detailed in Appendix 1 to the report. 
The Committee decided: 
(1) that the report be noted; 
(2) that the proposed response, detailed at Appendix 1 of the report, be approved; and 
(3) that this report be submitted to Education Resources Committee for noting. 
Councillor Loudon, having declared an interest in the above item of business, left the meeting during
its consideration 
10 Revenue Collection and Approval for Write-Offs 
A report dated 30 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on:- 
 collection performance for the financial year 2024/2025 to 30 September 2024 on revenue
income which comprised Council Tax, non-domestic rates, sundry debts and arrears
 performance in the Business Rates Incentivisation Scheme (BRIS)
 the write-off of irrecoverable Council Tax, non-domestic rates, Business Improvement
District (BID) levy, sundry debt and Housing Rent and associated charges 
Details were provided on current collection targets.  The Council was ahead of both target and
comparable performance from 2023/2024 in respect of Council Tax.  In respect of Sundry Debt,
the Council was equal to target and ahead of comparable performance from 2023/2024.  In
respect of non-domestic rates, the Council was equal to target and behind to comparable
performance from 2023/2024. 
In terms of arrears collection targets, the Council was ahead of both target and comparable
performance from 2023/2024 in respect of Council Tax and non-domestic rates.  In relation to
sundry debt, the Council was behind target and also comparable performance for 2023/2024. 
The Non Domestic Rates Incentivisation Scheme (NDRIS), formerly known as the Business Rates
Incentivisation Scheme (BRIS), was a Scottish Government initiative to incentivise growth of the
local business tax base, with a view to increasing NDR income yields. 
The Scottish Government set annual targets for growth (buoyancy) and councils which achieved
their target retained 50% of the additional income generated above the target.  The provisional
annual buoyancy target for South Lanarkshire Council in 2024/2025 had been set by the Scottish
Government at 0.9%. 
Performance against the NDRIS target would be reported to Committee on a quarterly basis. 
Buoyancy to the end of September 2024 was 0.65%.  The tax base required to achieve further
growth of 0.25% during the remaining 2 quarters of the financial year to secure additional income
under the scheme. 
9

Page 10

It was proposed that the following debts be written off:- 
 irrecoverable Council Tax accounts from 1993/1994 to 2024/2025 to the value of
£1,578,812.29 (including bulk write-off for 2000/2001) relating primarily to prescribed debt,
sequestrations and estates of the deceased
 irrecoverable non-domestic rates from 2022/2023 to 2024/2025 to the value of £418,405.04
relating primarily to debtors in liquidation, those who had ceased trading or had been
sequestrated
 BID levies totalling £2,859.91 administered by the Council on behalf of Hamilton, Carluke
and Lanark BID companies
 sundry debts to a value of £26,631.90
 former tenant rent arrears totalling £1,263,801.71 (including bulk write-off for 2022/2023 and
2023/2024 for temporary accommodation), factoring arrears of £751.22 and housing benefit
overpayments of £16,793.97 
Officers responded to a member’s question on the report. 
The Committee decided: 
(1) that the Council’s performance in the collection of revenues be noted; 
(2) that the current position in respect of the Business Rates Incentivisation Scheme be noted;
and 
(3) that the write-off of the following irrecoverable debts be approved:-
 Council Tax debt from 1993/1994 to 2024/2025 to the value of £1,578,812.29
 Non Domestic Rates from 2022/2023 to 2024/2025 totalling £418,405.04
 BID levies totalling £2,859.91
 sundry debts to a value of £26,631.90
 house rent and associated charges totalling £1,281,346.90 
[Reference:  Minutes of 21 August 2024 (Paragraph 13)] 
11 Reserves Strategy 
A report dated 2 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Council’s Reserves Strategy. 
A report to the Executive Committee on 26 June 2024 on the 2025/2026 to 2027/2028 Revenue
Budget Strategy, noted that it was good practice to have a Reserves Strategy.  Councils could
hold reserves for a number of reasons.  Some reserves were earmarked for identified expenditure
which would, or might occur, over the short, medium or long term.  In addition to those reserves,
there were Uncommitted Reserves which helped to manage unforeseen circumstances. 
Details of the Council’s Reserves and their balance at the end of 2023/2024 were detailed in
Section 4 of the report. 
The Council’s Reserves, their purpose, and also a proposed strategy was provided in Section 5
of the report. 
The Council’s Reserves at the end of 2023/2024, and a profile of anticipated use across the
coming years, was detailed in Appendix 1 of the report.  The main movements reflected the use
of Reserves in the Council’s Revenue Budget Strategy, relating to the use of Reserves established
following the implementation of the Service Concession arrangements and from the reduced
pension contributions. 
10

Page 11

The table in Appendix 1 showed that all Reserves were committed, except the
Unearmarked/Uncommitted General Fund balance of £13.043 million. 
The Committee decided: 
[ (1) that the detail on the Reserves and their balance at the end of 2023/2024, as detailed in
Section 4 of the report, be noted; 
(2) that the Strategy proposed for each Reserve, as detailed in Section 5 of the report, be noted;
and 
(3) that the planned use of Reserves across the coming years, as detailed in Section 6 and
Appendix 1 of the report, be noted. 
[Reference:  Minutes of the Executive Committee of 26 June 2024 (Paragraph 13)] 
12 Annual Procurement Report – 2023/2024
A report dated 9 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Annual Procurement Report for 2023/2024. 
The Procurement (Scotland) Reform Act 2014 required contracting authorities to prepare and
publish an Annual Procurement Report on their regulated procurement activities.  The Act stated
that the Report must include information under the following headings:- 
 regulated procurement activity
 procurement strategy
 community wealth building and community benefits
 sustainable procurement and supported businesses
 future planning
 other information 
A summary of procurement activity was provided in the report and the Council’s Annual
Procurement Report for 2023/2024 was attached as Appendix 1 to the report. 
The Committee decided: that the Annual Procurement Report for 2023/2024 be
noted. 
[Reference:  Minutes of 27 September 2023 (Paragraph 11)] 
13 Update of the Finance and Corporate Resources’ Risk Register and Risk Control
Plan
A report dated 8 October 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Risk Register and Risk Control Actions for Finance and Corporate Resources. 
The Resource had followed Council guidance in developing, monitoring and updating its Risk
Control Register on an ongoing basis.  The Register had been developed to ensure that the
Resource:- 
 was fully aware of the main risks
 was able to prioritise those risks
 had controls in place to eliminate or minimise the impact of the risk  
11

Page 12

The risks were scored in accordance with the Council’s scoring mechanism which scored risks
based on likelihood and impact of risk.  This resulted in risks being scored between 1 to 25 (low
to high).  Risks scored 15 to 25 were considered to be very high risks and those scored 8 to 12
were considered high risks.  Very high and high risks were monitored closely. 
The central Risk Management team annually reviewed Resource compliance with the Risk
Management Strategy.  The outcome of the 2023/2024 review identified that Finance and
Corporate Resources had achieved 100% compliance.   
The top risks identified for the Resource, that is those that were residually scored as being very
high and high, were attached in Appendix 1 to the report.  The main changes to the Risk Register
were summarised in paragraph 5.5 of the report. 
A comparison of the 2024 and 2023 Resource Risk Registers was detailed in Appendix 2 to the
report.  This appendix also detailed changes in risk descriptions. 
8 actions were due for completion during 2023/2024 and 6 had been completed.  One action had
been delayed and carried forward to the 2024/2025 risk control plan.  The other action had been
part completed, and the outstanding part carried forward to the 2024/2025 risk control plan. 
1 risk control action was due for delivery by the end of June 2024 and had been completed on
time. 
There were currently 14 risk actions due for completion during the remainder of 2024/2025. 
Outstanding actions to mitigate the risks would be progressed by relevant officers. 
Within Finance and Corporate Resources, 2 partnerships had been identified.  One of those, the
Community Planning Partnership (CPP), had been assessed as high risk and the remaining
partnership, the Clyde Valley Learning Partnership, had been assessed as low risk. 
Appropriate risk management arrangements were in place for the CPP, with regular reports on its
risk register and action plan presented to the CPP Board. 
To comply with best practice, a review of the Risk Management Strategy had been undertaken
this year by the Risk Management team, with input from the Council’s Risk Sponsors. 
The main revisions to the Strategy were detailed in paragraph 12.2 of the report, with a summary
of the Strategy in paragraph 12.3 of the report. 
The revised Strategy would take effect from 1 April 2025, to allow the final round of 2024/2025
risk reporting to be completed using the existing scoring and tolerance guidance. 
The Committee decided: 
(1) that the content of the Finance and Corporate Resources’ Risk Register, following review,
as detailed in Appendix 1 to the report, be noted; and 
(2) that it be noted that the outstanding risk control actions would be progressed by relevant
officers. 
[Reference: Minutes of 6 December 2023 (Paragraph 15)] 
14 Urgent Business 
There were no items of urgent business. 
12

Page 13

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2024/2025 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[p
 advise Committee of the forecast for the year to 31 March 2025 for Finance and
Corporate Resources, and the actual spend position for the period 1 April 2024 to
1 November 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected breakeven position on the 2024/2025 revenue budget for
Finance and Corporate Resources, as detailed in Appendix B of the report, be
noted; and
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the third revenue budget monitoring report presented to the Finance and
Corporate Resources Committee for the financial year 2024/2025. 
3.2. The report details the financial position for Finance and Corporate Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendix B provides the detailed financial position with
variance explanations by budget category.  Any variance explanations and proposed
budget virements are shown, where relevant, in Appendices C to I. 
3.3. This report reflects the actual spend to 1 November 2024 within the Resource
budget and the expected outturn forecast on expenditure and income at this date. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Appendix A is the service analysis statement and will outline the key projected
outturn variances by Service for the Resource. 
5.2. As at 1 November 2024, the Resource’s projected outturn position for 2024/2025 is
breakeven (Appendix B).
3
13

Page 14

5.3. The Resource breakeven position assumes a proposed transfer to reserves at year
end in relation to an anticipated underspend of £0.106 million on grants to voluntary
organisations within Administration, Legal, Licensing and Registration Services.  This
was included as part of saving FCR01 – Voluntary Grants, Community Grants, Gala
Grants and Civic Hospitality in the 2025/2026 Revenue Budget Gap and Savings
report to Executive Committee on 13 November 2024. 
5.4. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in Appendices C-I, where
relevant. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed.  In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 13 November 2024
 Finance and Corporate Resources Committee, 30 October 2024 
List of Background Papers
 Financial ledger and budget monitoring results to 1 November 2024. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel: 01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
14

Page 15

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Strategy 1,851 1,884 (33) (1.78%) 1,870
Transactions 17,684 17,699 (15) (0.08%) 11,162
Audit 318 304 14 4.40% 313
Information Technology 6,852 6,852 0 0.00% 9,680
Communications and Strategy 2,584 2,505 79 3.06% 1,679
Administration, Legal, Licensing and
Registration 4,048 4,059 (11) (0.27%) 2,679
Personnel 6,238 6,272 (34) (0.55%) 3,995
Net Controllable Exp. 39,575 39,575 0 0.00% 31,378 
Service Heading Explanation for significant projected outturn variances
Strategy There is an anticipated overspend in Employee Costs due to a lower than budgeted level of
turnover during the financial year. This is partially offset by an anticipated over recovery of
income from higher recharges to Funds, reflecting increased employee costs and
overheads incurred. (See Appendix C). 
Transactions  There is an anticipated overspend in Employee Costs due to a lower than budgeted level of
turnover during the financial year. In addition, there are projected overspends in Supplies
and Services, from contract renewals for Financial Software Packages, and Administration
Costs, due to higher than budgeted postage costs for Council Tax billing. These are partially
offset by an anticipated over recovery of income reflecting additional commission received
from Scottish Water and Non-Domestic Rates income. (See Appendix D). 
Audit  No significant projected outturn variances to report. (See Appendix E).
Information Technology There is an anticipated overspend in Employee Costs due to a lower than budgeted level of
turnover during the financial year. There is also an anticipated overspend in Supplies and
Services due to greater than budgeted IT subscription, licensing and contract costs which
are partially offset by an over recovery of income. In addition, there less than budgeted
telephony contract costs anticipated during the financial year. (See Appendix F). 
Communications and
Strategy 
There is an anticipated underspend in Employee Costs due to the level of turnover during
the financial year. (See Appendix G).
Administration, Legal,
Licensing and Registration
There is an anticipated overspend in Employee Costs due to a lower than budgeted level of
turnover during the financial year. This is being managed within the overall Service budget.
(See Appendix H). 
Personnel There is an anticipated underspend in Payments to Other Bodies relating to lower than
anticipated legal costs in the financial year. This is partially offset by a projected overspend
in Financing Charges due to higher than budgeted IT equipment leasing costs. In addition,
there is an anticipated under recovery of income relating to lower than budgeted income
from third party settlements. (See Appendix I). 
15

Page 16

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Finance & Corporate Resources Summary 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 32,322 32,464 (142) over (0.44%) 18,074 
Property Costs 3,716 3,736 (20) over (0.54%) 976 
Supplies & Services 7,744 7,925 (181) over (2.34%) 6,396 
Transport & Plant 34 27 7 under 20.59% 8 
Administration Costs 7,701 7,726 (25) over (0.32%) 4,432 
Payments to Other Bodies 4,040 3,976 64 under 1.58% 2,755 
Payments to Contractors 271 271 0 - 0.00% 55 
Transfer Payments 65,934 65,934 0 - 0.00% 34,644 
Financing Charges 1,211 1,237 (26) over (2.15%) 1,158 
Total Controllable Exp. 122,973 123,296 (323) over (0.26%) 68,498 
Total Controllable Inc. (84,098) (84,421) 323 over
recovered 0.38% (37,120) 
Net Controllable Exp. 38,875 38,875 0 - 0.00% 31,378 
Variance Explanations            
Variance explanations are shown in Appendices C to I as appropriate.                      
Budget Virements            
Budget Virements are noted in Appendices C to I as appropriate.        
16

Page 17

Appendix C 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Finance – Strategy Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000  £000  £000   £000 
Employee Costs 2,729 2,781 (52) over (1.91%) 1,552 1               
Property Costs 0 0 0 - 0.00% 0 
Supplies & Services 15 14 1 under 6.67% 10 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 115 114 1 under 0.87% 4 
Payments to Other Bodies 600 603 (3) over (0.50%) 329 
Payments to Contractors 16 16 0 - 0.00% 10 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 19 19 0 - 0.00% 2 
Total Controllable Exp. 3,494 3,547 (53) over (1.52%) 1,907 
Total Controllable Inc. (1,643) (1,663) 20 over
recovered 1.22% (37) 2               
Net Controllable Exp. 1,851 1,884 (33) over (1.78%) 1,870 
Variance Explanations  
1. The anticipated overspend in Employee Costs is due to a lower than budgeted level of turnover during the financial year.
2. The projected over recovery of income reflects a higher than budgeted recharge to Funds reflecting the level of employee costs and 
overheads incurred.      
Budget Virements  
None. 
17

Page 18

Appendix D 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Finance – Transactions Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 12,083 12,146 (63) over (0.52%) 6,717 1               
Property Costs 3,710 3,730 (20) over (0.54%) 953 a               
Supplies & Services 778 872 (94) over (12.08%) 841 2, a               
Transport & Plant 4 4 0 - 0.00% 0 
Administration Costs 1,326 1,424 (98) over (7.39%) 819 3, a, b               
Payments to Other Bodies 1,500 1,500 0 - 0.00% 925 
Payments to Contractors 255 255 0 - 0.00% 41 
Transfer Payments 65,934 65,934 0 - 0.00% 34,644 a               
Financing Charges 105 96 9 under 8.57% 4 
Total Controllable Exp. 85,695 85,961 (266) over (0.31%) 44,944 
Total Controllable Inc. (68,711) (68,962) 251 over
recovered 0.37% (33,782) 4, a               
Net Controllable Exp. 16,984 16,999 (15) over (0.09%) 11,162 
Variance Explanations    
1. The anticipated overspend in Employee Costs is due to a lower than budgeted level of turnover during the financial year.
2. The projected overspend reflects increased costs for two contract renewals for Civica financial software packages.
3. The anticipated overspend in Administration Costs is due to higher than budgeted postage costs for Council Tax billing.
4. The projected over recovery of income reflects additional commission received from Scottish Water for the collection of water and 
sewerage and Non-Domestic Rates statutory additions income. 
Budget Virements    
a. Budget realignment to reflect service delivery. Net Effect £0.000m: Property Costs (£0.150m); Supplies & Services £0.300m; 
Administration Costs (£1.084m); Transfer Payments £0.646m and Income £0.288m.
b. Transfer from Reserves to fund payment of Energy Vouchers: Net Effect £0.119m: Administration Costs £0.119m. 
18

Page 19

Appendix E 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Audit Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 468 456 12 under 2.56% 318 
Property Costs 0 0 0 - 0.00% 0 
Supplies & Services 7 4 3 under 42.86% 1 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 6 7 (1) over (16.67%) 1 
Payments to Other Bodies 0 0 0 - 0.00% 0 
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 4 4 0 - 0.00% 0 
Total Controllable Exp. 485 471 14 under 2.89% 320 
Total Controllable Inc. (167) (167) 0 - 0.00% (7) 
Net Controllable Exp. 318 304 14 under 4.40% 313 
Variance Explanations  
None.      
Budget Virements  
None. 
19

Page 20

Appendix F 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Information Technology Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 5,023 5,064 (41) over (0.82%) 2,929 1               
Property Costs 0 0 0 - 0.00% 0 
Supplies & Services 6,052 6,150 (98) over (1.62%) 5,148 2               
Transport & Plant 4 3 1 under 25.00% 0 
Administration Costs 1,591 1,532 59 under 3.71% 1,178 3               
Payments to Other Bodies 0 0 0 - 0.00% 0 
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 631 634 (3) over (0.48%) 975 
Total Controllable Exp. 13,301 13,383 (82) over (0.62%) 10,230 
Total Controllable Inc. (6,449) (6,531) 82 over
recovered 1.27% (550) 4               
Net Controllable Exp. 6,852 6,852 0 - 0.00% 9,680 
Variance Explanations  
1. The anticipated overspend in Employee Costs is due to a lower than budgeted level of turnover during the financial year.
2. The anticipated overspend in Supplies and Services is due to greater than budgeted IT subscription, licensing and contract costs which    
are partially offset by an over recovery of income (see 4 below).
3. The projected underspend reflects less than budgeted telephony contract costs during the financial year.
4. The projected over recovery of income reflects greater than budgeted level of recharges during the financial year which partially offsets 
the increased IT costs above.   
Budget Virements
None.   
20

Page 21

Appendix G 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Communications and Strategy Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note               
Employee Costs 2,146 2,067 79 under 3.68% 1,134 1               
Property Costs 0 0 0 - 0.00% 1 
Supplies & Services 648 648 0 - 0.00% 245 
Transport & Plant 4 4 0 - 0.00% 2 
Administration Costs 1,102 1,102 0 - 0.00% 458 
Payments to Other Bodies 978 978 0 - 0.00% 842 
Payments to Contractors 0 0 0 - 0.00% 4 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 351 351 0 - 0.00% 170 
Total Controllable Exp. 5,229 5,150 79 under 1.51% 2,856 
Total Controllable Inc. (2,645) (2,645) 0 - 0.00% (1,177) 
Net Controllable Exp. 2,584 2,505 79 under 3.06% 1,679 
Variance Explanations  
1. The underspend in Employee Costs is due to the anticipated level of turnover during the year.      
Budget Virements  
None.     
21

Page 22

Appendix H 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Administration, Legal, Licensing and Registration 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000    £000 
Employee Costs 3,474 3,541 (67) over (1.93%) 1,974 1, a               
Property Costs 6 6 0 - 0.00% 4 
Supplies & Services 140 116 24 under 17.14% 64 
Transport & Plant 13 13 0 - 0.00% 6 
Administration Costs 2,356 2,330 26 under 1.10% 1,331 
Payments to Other Bodies 678 678 0 - 0.00% 473 
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 65 66 (1) over (1.54%) 6 
Total Controllable Exp. 6,732 6,750 (18) over (0.27%) 3,858 
Total Controllable Inc. (2,684) (2,691) 7 over
recovered 0.26% (1,179) a               
Net Controllable Exp. 4,048 4,059 (11) over (0.27%) 2,679   
Variance Explanations  
1. The anticipated overspend in Employee Costs is due to a lower than budgeted level of turnover during the financial year. 
Budget Virements  
a. Budget realignment to reflect licensing and registration income. Net Effect £0.000m: Employee Costs £0.146m and Income (£0.146m). 
22

Page 23

Appendix I 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 1 November 2024 (No.8) 
Personnel 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000      
Employee Costs 6,399 6,409 (10) over (0.16%) 3,450 
Property Costs 0 0 0 - 0.00% 18 
Supplies & Services 104 121 (17) over (16.35%) 87 
Transport & Plant 9 3 6 under 66.67% 0 
Administration Costs 1,205 1,217 (12) over (1.00%) 641 
Payments to Other Bodies 284 217 67 under 23.59% 186 1               
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 36 67 (31) over (86.11%) 1 2               
Total Controllable Exp. 8,037 8,034 3 under 0.04% 4,383 
Total Controllable Inc. (1,799) (1,762) (37) under
recovered (2.06%) (388) 3               
Net Controllable Exp. 6,238 6,272 (34) over (0.55%) 3,995 
Variance Explanations  
1. The projected underspend mainly relates to lower than budgeted legal costs in the financial year.
2. The projected overspend in is due to higher than budgeted costs for IT equipment leasing.
3. The anticipated under recovery of income mainly relates to lower than budgeted income from third party settlements. 
Budget Virements  
None. 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2024/2025 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Finance and
Corporate Resources for the period 1 April 2024 to 1 November 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Finance and Corporate Resources capital programme of
£3.086 million, and forecast expenditure of £3.086 million, be noted.
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Finance and Corporate
Resources Committee for the financial year 2024/2025.  Further reports will follow
throughout the year. 
3.2. The budget of £3.086 million for Finance and Corporate Resources is based on the
overall Capital Programme for 2024/2025, as approved by the Executive Committee
on 26 June 2024.  There has been no change to this budget since the last report to
this Committee. 
3.3. The report details the financial position for Finance and Corporate Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2024/2025 Budget 
As detailed in Section 3.2, the revised capital programme for Finance and Corporate
Resources for 2024/2025 is £3.086 million. 
5.2. 2024/2025 Forecast
Appendix A shows a forecast for the financial year of £3.086 million.  For information,
actual expenditure to 1 November 2024 is £2.619 million. 
4
25

Page 26

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Finance and Corporate Resources Committee, 30 October 2024 
List of Background Papers
 Financial ledger to 1 November 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy) 
Ext:  2699 (Tel:  01698 452699)
E-mail: graham.booth@southlanarkshire.gov.uk
26

Page 27

Appendix A 
South Lanarkshire Council
Capital Expenditure 2024-2025
Finance and Corporate Resources Programme
For Period 1 April 2024 – 1 November 2024 
Finance and Corporate
Resources Total Original
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000
Information Technology Services  3,086 - - 3,086 3,086 - 2,619
TOTAL 3,086 - - 3,086 3,086 - 2,619 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources – Workforce
Monitoring – October and November 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for October and November 2024 relating to
Finance and Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for October and November 2024
relating to Finance and Corporate Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 14 September 2024 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Finance and
Corporate Resources provides information on the position for October and
November 2024. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of November 2024 for
Finance and Corporate Resources. 
The Resource absence figure for November 2024 was 4.6%, this figure has
increased by 1.4% when compared to the previous month and is 2.3% lower than the
Council-wide figure.  Compared to November 2023, the Resource absence figure
has increased by 1.1%. 
Based on the absence figures at November 2024 and annual trends, the annual
average absence for the Resource for 2024/2025 is 3.2%, compared to a Council-
wide average figure of 5.7%.
5
29

Page 30

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 35 referrals were made this period.  This represents a
decrease of 10 when compared with the same period last year. 
4.3. Accident/Incident Statistics
There were no accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 1 disciplinary hearing was held within the Resource.  This figure
has remained the same when compared to the same period last year.  No appeals
were heard by the Appeals Panel, this figure has also remained the same when
compared to last year and no appeals panels were pending.  No grievance or Dignity
at Work complaints were raised within the Resource, these figures remain
unchanged when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 5 leavers this period eligible for an exit interview.  This figure
has decreased by 4, when compared with the same period last year.  1 exit interview
was conducted in this period, this figure has remained the same when compared to
the same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been an increase of 50 employees in post from 11 June 2024 to
14 September 2024. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.
30

Page 31

10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources – 30 October 2024 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Eileen McPake, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Eileen.McPake@southlanarkshire.gov.uk 
31

Page 32

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 3.2 October 0.0 0.0 0.0 October 3.8 3.2 3.2 October 5.8 5.1 6.0
November 3.4 3.5 4.6 November 0.0 0.0 0.0 November 3.4 3.5 4.6 November 6.5 6.2 6.9
December 4.3 3.3 December 0.0 0.0 December 4.3 3.3 December 7.0 6.6
January 4.3 2.8 January 0.0 0.0 January 4.3 2.8 January 5.8 6.1
February 3.8 3.5 February 0.0 0.0 February 3.8 3.5 February 5.9 6.4
March 3.8 2.6 March 0.0 0.0 March 3.8 2.6 March 6.4 6.3
Annual Average 3.8 3.5 3.2 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.2 Annual Average 5.7 5.4 5.7
Average Apr-Nov 3.6 3.7 3.3 Average Apr-Nov 0.0 0.0 0.0 Average Apr-Nov 3.6 3.7 3.3 Average Apr-Nov 5.4 4.9 5.4
824 0 824 15836
Council WideManual Workers
No of Employees at 30 November 2024
Resource Total
No of Employees at 30 November 2024
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 30 November 2024 No of Employees at 30 November 2024
APT&C
32

Page 33

Oct - Nov Oct - Nov
2023 2024
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 15 17
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 45 35
Oct - Nov Oct - Nov
2023 2024
Specified Injuries* 0 0
Over 7 day absences 0 0
Over 3 day absences** 0 0
Minor 0 0
Near Miss *** 0 0
Violent Incident:  Physical**** 1 0
Violent Incident:  Verbal***** 0 0
Total Accidents/Incidents 1 0
Oct - Nov Oct - Nov
2023 2024
Total Number of Hearings 1 1
Time Taken to Convene Hearing October - Oct to Nov 2024
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 0 0
Oct - Nov Oct - Nov
2023 2024
Number of Grievances 0 0
Oct - Nov Oct - Nov
2023 2024
Number of Incidents 0 0
RECORD OF DIGNITY AT WORK
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
FINANCE AND CORPORATE  RESOURCES
8 7
2 0
20 11
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
33

Page 34

Oct - Nov Oct - Nov
2023 2024
Career Advancement 1 1
Number of Exit Interviews conducted 1 1
Total Number of Leavers Eligible for Exit Interview 9 5
Percentage of interviews conducted 11% 20%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
FINANCE AND CORPORATE  RESOURCES
34

Page 35

As at 14 September 2024
Total Number of Employees
F/T P/T F/T P/T
183 24 366 249
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
8.00 93.90 341.81 210.36 53.96 22.00 0.00 0.00 0.00 730.03
As at 11 June 2024
Total Number of Employees
F/T P/T F/T P/T
183 14 364 211
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
8.00 90.61 326.03 202.14 51.72 23.00 0.00 0.00 0.00 701.50
Appendix 3
JOINT STAFFING WATCH RETURN
FINANCE AND CORPORATE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
822
MALE FEMALE TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
772
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council-wide Workforce Monitoring – October and
November 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period October
and November 2024
[1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for the period October and November
2024 relating to the Council be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 14 September 2024
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Committee.  This report for the Council
provides information on the position for the period October and November 2024. 
4. Attendance Statistics
4.1. Information on absence statistics for the Council and each Resource, as analysed for
November 2024, is provided in Appendices 1 to 8.  Points to note are:- 
The Council’s absence rate for November 2024, shown in Appendix 1, is 6.9%,
which represents an increase of 0.9% when compared with last month and the figure
has increased by 0.7% when compared to November 2023. 
When compared to November 2023, the APT&C absence rate has increased by
0.9%, the teachers’ figure has increased by 0.7% and the manual workers’ figure has
increased by 0.3%. 
Based on annual trends and the absence rate to November 2024, the average
absence rate for the Council for the financial year 2024/2025 is 5.7%.
6
37

Page 38

In comparison to November 2023 (Appendix 8):- 
 Psychological and musculoskeletal conditions are the main reasons for absence
 Total days lost due to psychological conditions have decreased by 507 days
 Total days lost due to musculoskeletal conditions have increased by 294 days
 Total days lost due to respiratory conditions have decreased by 501 days
 Total days lost due to stomach, bowel, blood and metabolic disorders have
increased by 522 days 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
5. Occupational Health
5.1. Information on Occupational Health for the period October and November 2024 is
provided in Appendix 9. 
 during the period there were 303 employees referred for a medical examination,
an increase of 80 when compared to the same period last year.  Both
musculoskeletal and psychological conditions continue to be the main reason for
medical referrals
 a total of 369 employees attended physiotherapy treatment, showing a decrease
of 1 when compared to the same period last year.  Of the 369 employees
referred, 75% remained at work whilst undertaking treatment
 during this period 383 employees were referred to the Employee Support Officer,
showing a decrease of 6 when compared with the same period last year.  Of the
referrals made this period, 85% related to personal reasons
 143 employees were referred to the PAM Assist counselling service this period,
showing an increase of 5 when compared with the same period last year.  All the
referrals made this period were made directly by employees.  Personal reasons
accounted for 0% of the referrals made, 18% were for work related reasons and
82% was for other reasons
 8 employees were referred for Cognitive Behavioural Therapy this period, an
increase of 5 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident reported for October and November 2024 is contained in
Appendix 10. 
 the number of accidents/incidents recorded was 221 of those, 103 have been
investigated and categorised 118 are still in process of being investigated
 of those investigated, no specified injuries were recorded
 of those investigated there were 98 minor accidents/incidents
 of those investigated there was 1 accident resulting in an absence lasting over 3
days during the period
 of those investigated there were 4 accidents resulting in an absence lasting over
7 days during the period
38

Page 39

7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals
7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation
Referrals for October and November 2024 is contained in Appendices 11, 12a and
12b. 
 in total, 39 disciplinary hearings were held and concluded across Resources
within the Council, this figure has increased by 19 when compared to the same
period last year
 action was taken in 34 of these cases.  No appeals were raised against the
outcomes during the period
 our target is to convene disciplinary hearings within 6 weeks, 44% of hearings
met this target
 during the period, no appeals were heard by the Appeals Panel
 at the end of November, 1 Appeals Panel was pending
 during the period, 6 grievance complaints were raised
 during the period, 4 Dignity at Work complaints were raised
 during the period, 1 referral for mediation was submitted which was deemed
suitable 
8. Analysis of Leavers and Exit Interviews
8.1. Information on the number of leavers and exit interviews for the period October and
November 2024 is contained in Appendix 13.  Exit interviews are conducted with
employees who leave voluntarily. 
Labour Turnover 
Using information compiled from Resources and Staffing Watch information as at
14 September 2024, the Council’s turnover figure for October and November 2024 is
as follows:- 
107 leavers eligible for exit interviews/15,726 employees in post = Labour Turnover
of 0.7%. 
Based on the figure at November 2024, the annual labour turnover figure for the
financial year 2024/2025 for the Council is 4.1%. 
8.2. Analysis of Leavers and Exit Interviews 
 there were a total of 107 employees leaving the Council that were eligible for an
exit interview, a decrease of 12 when compared with the same period last year
 there were a total of 32 exit interviews conducted which remains unchanged
when compared with same period last year 
9. Recruitment Monitoring
9.1. Information on Recruitment Monitoring for October and November 2024 is contained
within Appendix 14. 
From an analysis of Equal Opportunities Monitoring Forms, the main points to note
are:- 
 overall, 3,465 applications and 3,448 completed Equal Opportunities Monitoring
Forms were received
 of those applicants who declared themselves as disabled (91), 46 were
shortleeted for interview and 9 were appointed
39

Page 40

 of those applicants of a black/ethnic minority background (304), 80 were
shortleeted for interview and 6 were appointed
 of those applicants who are veterans (21), 13 were shortleeted for interview and
no was appointed 
10. Staffing Watch
10.1. There has been an increase of 693 in the number of employees in post from 11 June
2024 to 14 September 2024.  Details of the staffing watch are contained in Appendix
15. 
11. Employee Implications
11.1. There are no implications for employees arising from the information presented in
this report. 
12. Financial Implications
12.1. All financial implications are accommodated within existing budgets. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no climate change, sustainability or environmental implications arising
from the information presented in this report. 
14. Other Implications
14.1. There are no implications for risk in terms of the information contained within this
report. 
15. Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
15.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources Committee – 30 October 2024 
List of Background Papers
 Monitoring information provided by Resources
40

Page 41

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
41

Page 42

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.2 5.2 5.2 April 2.7 2.8 2.9 April 8.8 7.0 7.3 April 5.6 5.1 5.2
May 5.0 5.1 5.4 May 3.6 3.2 3.0 May 7.6 6.2 7.1 May 5.4 5.1 5.3
June 5.0 4.9 5.3 June 2.6 2.2 2.8 June 8.1 6.5 7.2 June 5.3 4.7 5.2
July 4.5 4.0 4.3 July 1.4 1.1 1.0 July 7.4 5.8 6.3 July 4.6 3.8 4.1
August 4.3 4.2 4.6 August 1.4 1.3 1.9 August 7.4 6.2 7.5 August 4.4 4.1 4.7
September 5.2 5.2 6.2 September 2.8 2.9 3.5 September 8.0 7.6 8.3 September 5.4 5.3 6.1
October 5.7 5.2 6.3 October 3.4 2.7 3.8 October 8.1 7.1 7.7 October 5.8 5.1 6.0
November 6.3 6.1 7.0 November 4.7 4.3 5.0 November 8.6 8.1 8.4 November 6.5 6.2 6.9
December 6.7 6.7 December 5.3 4.8 December 8.9 7.8 December 7.0 6.6
January 5.2 5.8 January 4.3 4.8 January 8.0 7.8 January 5.8 6.1
February 5.7 6.3 February 4.1 4.9 February 7.9 8.0 February 5.9 6.4
March 6.2 6.3 March 4.6 4.1 March 8.3 8.1 March 6.4 6.3
Annual Average 5.4 5.4 5.8 Annual Average 3.4 3.3 3.5 Annual Average 8.1 7.2 7.6 Annual Average 5.7 5.4 5.7
Average Apr-Nov 5.2 5.0 5.5 Average Apr-Nov 2.8 2.6 3.0 Average Apr-Nov 8.0 6.8 7.5 Average Apr-Nov 5.4 4.9 5.4
7360 4040 4436 15836
Council Wide
No of Employees at 30 November 2024 No of Employees at 30 November 2024
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Council Wide
APT&C Teachers
No of Employees at 30 November 2024 No of Employees at 30 November 2024
Manual Workers
42

Page 43

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 4.4 3.6 3.2 April 7.3 6.3 6.8 April 6.9 6.0 6.3 April 5.6 5.1 5.2
May 3.9 3.7 3.1 May 6.8 6.3 6.3 May 6.3 5.9 5.9 May 5.4 5.1 5.3
June 3.5 4.3 4.1 June 7.2 5.9 6.4 June 6.7 5.7 6.0 June 5.3 4.7 5.2
July 3.9 2.3 3.8 July 5.9 4.6 4.5 July 5.6 4.3 4.4 July 4.6 3.8 4.1
August 3.4 3.0 3.4 August 6.6 5.2 6.2 August 6.1 4.9 5.7 August 4.4 4.1 4.7
September 3.1 2.5 3.8 September 7.9 7.1 7.5 September 7.1 6.4 6.9 September 5.4 5.3 6.1
October 5.1 2.0 4.2 October 7.5 7.0 7.2 October 7.1 6.3 6.7 October 5.8 5.1 6.0
November 4.2 2.6 3.6 November 8.3 8.1 8.3 November 7.7 7.3 7.6 November 6.5 6.2 6.9
December 3.7 3.0 December 8.8 7.5 December 8.0 6.8 December 7.0 6.6
January 2.6 3.6 January 7.4 7.4 January 6.7 6.9 January 5.8 6.1
February 3.6 4.0 February 7.4 7.8 February 6.9 7.2 February 5.9 6.4
March 3.9 3.2 March 7.9 7.9 March 7.3 7.2 March 6.4 6.3
Annual Average 3.8 3.2 3.6 Annual Average 7.4 6.8 7.0 Annual Average 6.9 6.2 6.5 Annual Average 5.7 5.4 5.7
Average Apr-Nov 3.9 3.0 3.7 Average Apr-Nov 7.2 6.3 6.7 Average Apr-Nov 6.7 5.9 6.2 Average Apr-Nov 5.4 4.9 5.4
587 2858 3445 15836
Manual Workers Resource Total
No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024
Appendix 2
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Community and Enterprise Resources
APT&C Council Wide
43

Page 44

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.0 5.4 April 2.7 2.8 2.9 April 4.0 3.8 4.0 April 5.6 5.1 5.2
May 5.5 5.4 6.0 May 3.6 3.2 3.0 May 4.5 4.2 4.4 May 5.4 5.1 5.3
June 5.1 4.8 5.5 June 2.6 2.2 2.8 June 3.7 3.4 4.1 June 5.3 4.7 5.2
July 3.8 3.4 3.2 July 1.4 1.1 1.0 July 2.5 2.2 2.0 July 4.6 3.8 4.1
August 3.6 4.0 3.9 August 1.4 1.3 1.9 August 2.4 2.5 2.8 August 4.4 4.1 4.7
September 5.8 5.9 6.6 September 2.8 2.9 3.5 September 4.1 4.3 4.9 September 5.4 5.3 6.1
October 6.5 5.5 6.5 October 3.4 2.7 3.8 October 4.8 4.0 5.0 October 5.8 5.1 6.0
November 7.9 7.1 7.8 November 4.7 4.3 5.0 November 6.2 5.6 6.2 November 6.5 6.2 6.9
December 8.5 8.1 December 5.3 4.8 December 6.8 6.3 December 7.0 6.6
January 6.1 6.6 January 4.3 4.8 January 5.1 5.6 January 5.8 6.1
February 6.8 7.2 February 4.1 4.9 February 5.4 6.0 February 5.9 6.4
March 7.0 7.5 March 4.6 4.1 March 5.7 5.7 March 6.4 6.3
Annual Average 6.0 5.9 6.2 Annual Average 3.4 3.3 3.5 Annual Average 4.6 4.5 4.8 Annual Average 5.7 5.4 5.7
Average Apr-Nov 5.5 5.1 5.6 Average Apr-Nov 2.8 2.6 3.0 Average Apr-Nov 4.0 3.8 4.2 Average Apr-Nov 5.4 4.9 5.4
3276 4040 7316 15836
Appendix 3
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Education Resources
Council WideAPT&C Teachers Resource Total
No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024
44

Page 45

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 3.2 October 0.0 0.0 0.0 October 3.8 3.2 3.2 October 5.8 5.1 6.0
November 3.4 3.5 4.6 November 0.0 0.0 0.0 November 3.4 3.5 4.6 November 6.5 6.2 6.9
December 4.3 3.3 December 0.0 0.0 December 4.3 3.3 December 7.0 6.6
January 4.3 2.8 January 0.0 0.0 January 4.3 2.8 January 5.8 6.1
February 3.8 3.5 February 0.0 0.0 February 3.8 3.5 February 5.9 6.4
March 3.8 2.6 March 0.0 0.0 March 3.8 2.6 March 6.4 6.3
Annual Average 3.8 3.5 3.2 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.2 Annual Average 5.7 5.4 5.7
Average Apr-Nov 3.6 3.7 3.3 Average Apr-Nov 0.0 0.0 0.0 Average Apr-Nov 3.6 3.7 3.3 Average Apr-Nov 5.4 4.9 5.4
824 0 824 15836
Council WideManual Workers
No of Employees at 30 November 2024
Resource Total
No of Employees at 30 November 2024
Appendix 4
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 30 November 2024 No of Employees at 30 November 2024
APT&C
45

Page 46

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.7 5.3 April 10.6 6.9 7.2 April 7.6 6.2 6.1 April 5.6 5.1 5.2
May 4.5 4.9 5.2 May 8.1 6.1 8.1 May 6.0 5.4 6.4 May 5.4 5.1 5.3
June 4.9 5.4 5.7 June 8.5 6.8 8.4 June 6.4 6.0 6.8 June 5.3 4.7 5.2
July 5.5 5.0 5.3 July 8.9 8.1 8.6 July 6.9 6.2 6.7 July 4.6 3.8 4.1
August 4.7 5.1 5.5 August 7.1 8.5 8.8 August 5.7 6.4 6.9 August 4.4 4.1 4.7
September 4.5 4.7 7.5 September 6.3 7.8 7.4 September 5.2 6.0 7.5 September 5.4 5.3 6.1
October 4.3 4.9 7.3 October 7.8 5.2 6.0 October 5.8 5.0 6.8 October 5.8 5.1 6.0
November 4.6 4.8 6.8 November 7.8 6.7 6.2 November 5.9 5.6 6.5 November 6.5 6.2 6.9
December 4.4 5.1 December 7.2 7.4 December 5.6 6.0 December 7.0 6.6
January 4.5 4.4 January 5.5 6.0 January 4.9 5.0 January 5.8 6.1
February 4.4 5.2 February 6.2 6.3 February 5.1 5.6 February 5.9 6.4
March 5.3 5.3 March 6.8 7.2 March 5.9 6.1 March 6.4 6.3
Annual Average 4.8 5.0 5.7 Annual Average 7.6 6.9 7.3 Annual Average 5.9 5.8 6.4 Annual Average 5.7 5.4 5.7
Average Apr-Nov 4.8 5.1 6.1 Average Apr-Nov 8.1 7.0 7.6 Average Apr-Nov 6.2 5.9 6.7 Average Apr-Nov 5.4 4.9 5.4
871 557 1428 15836
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
APT&C Manual Workers Council Wide
No of Employees at 30 November 2024No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024
46

Page 47

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 6.2 6.5 6.5 April 12.6 9.4 8.8 April 8.3 7.4 7.3 April 5.6 5.1 5.2
May 5.7 5.8 5.8 May 10.1 8.4 9.5 May 7.1 6.6 7.0 May 5.4 5.1 5.3
June 5.9 5.5 6.0 June 11.3 8.6 9.2 June 7.6 6.5 7.0 June 5.3 4.7 5.2
July 6.0 5.4 6.5 July 11.8 8.8 11.2 July 7.9 6.5 8.0 July 4.6 3.8 4.1
August 6.0 4.8 6.9 August 10.8 8.6 11.4 August 7.5 6.0 8.4 August 4.4 4.1 4.7
September 5.9 5.6 7.2 September 9.6 9.3 12.0 September 7.1 6.8 8.8 September 5.4 5.3 6.1
October 5.8 6.5 7.5 October 10.4 8.5 11.0 October 7.3 7.1 8.6 October 5.8 5.1 6.0
November 6.0 7.3 8.1 November 10.4 9.0 10.0 November 7.4 7.8 8.7 November 6.5 6.2 6.9
December 6.4 7.4 December 10.6 9.5 December 7.7 8.1 December 7.0 6.6
January 5.2 7.0 January 12.0 10.3 January 7.4 8.1 January 5.8 6.1
February 5.8 7.0 February 11.0 9.9 February 7.5 7.9 February 5.9 6.4
March 7.0 7.1 March 10.9 9.4 March 8.2 7.9 March 6.4 6.3
Annual Average 6.0 6.3 Annual Average 11.0 9.1 Annual Average 7.6 7.2 Annual Average 5.7 5.4
Average Apr-Nov 5.9 5.9 6.8 Average Apr-Nov 10.9 8.8 10.4 Average Apr-Nov 7.5 6.8 8.0 Average Apr-Nov 5.4 4.9 5.4
1802 1021 2823 15836
Appendix 6
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Social Work Resources
APT&C Council WideResource TotalManual Workers
No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024 No of Employees at 30 November 2024
47

Page 48

Appendix 7
Absence by long and short term
From: 1 September 2024 to 30 November 2024
Community and Enterprise 3445 2.3 4.6 6.9 2.1 4.6 6.7 2.8 4.8 7.6
Education 7316 2.0 2.9 4.9 1.6 3.4 5.0 2.6 3.6 6.2
Finance and Corporate 824 0.8 2.4 3.2 1.0 2.2 3.2 2.3 2.3 4.6
Housing & Technical 1428 2.1 5.4 7.5 1.9 4.9 6.8 2.2 4.3 6.5
Social Work 2823 2.0 6.8 8.8 2.7 5.9 8.6 2.6 6.1 8.7
Council Overall for September
2024 to November 2024 15836 2.0 4.1 6.1 1.9 4.1 6.0 2.6 4.3 6.9
September 2024
Total Short
Term %
Total Long
Term %
Resource Total
Absence %
November 2024
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
Resource No of
employees
Resource
Total
Absence %
October 2024
Total Short
Term %
Total
Long
Term %
48

Page 49

From : 1 November 2024 - 30 November 2024
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1536 30 1281 25 47 1 528 10 877 17 4269 21
Psychological 1229 24 3065 59 270 5 444 9 1714 33 6722 33
Stomach, Bowel, Blood, Metabolic Disorders 644 12 954 18 61 1 272 5 586 11 2517 12
Respiratory 634 12 1264 24 180 3 158 3 382 7 2618 13
Other Classification 1122 22 1940 38 120 2 305 6 606 12 4093 20
Total Days Lost By Resource 5165 100 8504 165 678 13 1707 33 4165 100 20219 100
Total Work Days Available
From : 1 November 2023 - 30 November 2023
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1410 26 1161 13 125 21 450 27 829 20 3975 20
Psychological 1546 29 3282 38 249 41 537 32 1615 39 7229 36
Stomach, Bowel, Blood, Metabolic Disorders 480 9 871 10 50 8 180 11 414 10 1995 10
Respiratory 855 16 1472 17 55 9 273 16 464 11 3119 15
Other Classification 1044 20 1865 22 127 21 220 13 772 19 4028 20
Total Days Lost By Resource 5335 100 8651 100 606 100 1660 100 4094 100 20346 100
Total Work Days Available
*WDL = Work Days Lost
68316 136122 14716
Social Work
Resources
52265297591749215496273191
Percentage
Housing and
Technical
Resources
Education
Resources
PercentageTotal WDL
By ReasonREASONS
Community and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Housing and
Technical
Resources
Finance and
Corporate
26136 47820
Appendix 8
Attendance Monitoring
Absence Classification
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total WDL
By Reason
49

Page 50

Appendix 9
Teachers Others
68 39 74 7 41 74
66 16 35 8 41 57
Oct-Nov 2023 Oct-Nov 2024 Oct-Nov 2023 Oct-Nov 2024 Oct-Nov 2023 Oct-Nov 2024
94 81 71 74 0 0
56 59 182 187 1 0
68 89 15 17 0 0
20 11 28 15 0 0
47 34 93 90 Social Work 0 3
85 95 389 383 Not Disclosed 2 5
370 369 Total 3 8
Reason Oct-Nov 2023 Oct-Nov 2024
Work Stress 26 26
Addicition 0 2
Personal 19 0
Anxiety/Depression 62 94
Bereavement 31 21
Total 138 143
Finance and Corporate
Education
Community and Enterprise
Resource
Housing and Technical
Occupational Health Reports
From: 1 October - 30 November 2024 comparison with 1 October - 30 November 2023
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
Total (Oct-Nov 2024) 303
Total (Oct-Nov 2023) 223
No of Employees Referred For Physiotherapy No of Employees Referred To Employee Support Officer No of Employees Referred For Cognitive Behavioural Therapy
Resource Resource
Community and Enterprise Community and Enterprise
Education (Teachers) Education
Education (Others) Finance and Corporate
Analysis of Counselling Referrals by Cause
Total
Finance and Corporate Housing and Technical
Housing and Technical Social Work
Social Work Total
50

Page 51

2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024
Specified Injury 1 0 0 0 0 0 0 0 0 0 1 0
Specified Injury (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Specified Injury* 1 0 0 0 0 0 0 0 0 0 1 0
Over 7 Day 2 1 0 1 0 0 1 1 0 1 3 4
Over 7 Day (Violence) 0 0 2 0 0 0 0 0 0 0 2 0
Total Over 7 Day** 2 1 2 1 0 0 1 1 0 1 5 4
Over 3 Day 0 0 2 1 0 0 1 0 2 0 5 1
Over 3 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3 Day** 0 0 2 1 0 0 1 0 2 0 5 1
Minor Injury 27 9 40 6 0 0 5 0 9 3 81 18
Near Miss 4 0 8 1 0 0 0 0 0 2 12 3
Violence (Physical) 3 10 289 60 1 0 0 0 11 1 304 71
Violence (Verbal) 3 0 43 4 0 0 1 1 0 1 47 6
Total Minor*** 37 19 380 71 1 0 6 1 20 7 444 98
Total Finalised 40 20 384 73 1 0 8 2 22 8 455 103
Accident 0 3 4 20 0 0 0 3 0 2 4 17
Incident 0 1 2 9 0 0 0 2 0 0 2 12
Violence (Physical) 0 0 19 59 0 0 0 0 0 2 19 61
Violence (Verbal) 0 0 2 14 0 0 0 0 0 0 2 14
Near Miss 0 1 1 2 0 0 0 0 0 0 1 3
Total to be investigated**** 0 5 28 104 0 0 0 5 0 4 28 118
Total Events/Month 40 25 412 177 1 0 8 7 22 12 483 221
**Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury)
***A minor injury is an injury not covered by  Over 7 day, Over 3 day or Specified
****In process relates to records not yet investigated/defined by managers
*Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or
penetrating injury as defined by the HSE
Appendix 10
Analysis of Accidents / Incidents
From: 1 October - 30 November 2024 comparison with 1 October - 30 November 2023
Accidents by Month of Occurrence
Community and Enterprise Education Finance and Corporate Housing & Tech Social Work TOTAL
51

Page 52

APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total
Community and Enterprise 1 8 N/A 9 0 0 N/A 0 1 8 N/A 9 1 7 1 89% 9.89
Education 2 0 2 4 1 0 0 1 1 0 2 3 0 4 0 100% 4
Finance and Corporate 1 0 N/A 1 0 0 N/A 0 1 0 N/A 1 1 0 0 100% 1
Housing and Technical 4 15 N/A 19 0 4 N/A 4 4 11 N/A 15 0 1 18 6% 19
Social Work 4 2 N/A 6 0 0 N/A 0 4 2 N/A 6 0 3 3 50% 6
Total  (Oct-Nov 2024) 12 25 2 39 1 4 0 5 11 21 2 34 2 15 22 44% 39
Total  (Oct-Nov 2023) 5 14 1 20 0 1 0 1 5 13 1 19 14 4 1 90% 19
APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total
Total  (Oct-Nov 2024) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total  (Oct-Nov 2023) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 October - 30 November 2024
Appeal's Panel
Total 0
Not Upheld Total
Appeals
Pending
0
Withdrawn
0
Resource
Resource
Action Taken
Upheld Upheld in Part
Manual/ Craft
Outcome of Disciplinary Hearings
Manual/ Craft
Upheld
APT&C
Upheld in Part
Teachers
% Held within
6 Weeks
No of Appeals
No Action
APT&C 4-6 6+3Teachers Total
No of Disciplinary Hearings
100
Appendix 11
Outcome of Appeals
Not Upheld
From: 1 October - 30 November 2024 comparison with 1 October - 30 November 2023
Appeals pending to date
Record of Disciplinary Hearings
No of weeks to convene Disciplinary Hearing
Total
52

Page 53

Appendix 12a
Record of Grievances
From: 1 October - 30 November 2024 comparison with 1 October - 30 November 2023
Grievances No of Grievances No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Total (Oct-Nov 2024) 6 0 0 0 6
Total (Oct-Nov 2023) 1 0 0 1 0
Dignity at Work
From: 1 October - 30 November 2024 comparison with 1 October - 30 November 2023
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Total (Oct-Nov 2024) 4 0 0 0 0 4
Total (Oct-Nov 2023) 0 0 0 0 0 0
53

Page 54

Appendix 12b
Referrals for Workplace Mediation
As at November 2024
Workplace Mediation Oct-24 Nov-24
No of Referrals 1 0
*No of Successful Cases 0 0
*No of Unsuccessful Cases 0 0
No of cases unsuitable for mediation 0 1
Workplace Mediation Oct-23 Nov-23
No of Referrals 0 0
*No of Successful Cases 1 0
*No of Unsuccessful Cases 0 0
No of cases unsuitable for mediation 0 0
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
54

Page 55

Appendix 13
From 1 October - 30 November 2024
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 3 10 1 2 3 19 59%
Personal Reasons 2 1 0 1 0 4 13%
Moving outwith area 0 0 0 0 2 2 6%
Travelling difficulties 0 0 0 0 1 1 3%
Other 1 1 0 2 2 6 19%
Number of exit interviews
conducted 6 12 1 5 8 32
Total no. of leavers per Resource
eligible for an exit interview 22 47 5 15 18 107
% of leavers interviewed 27% 26% 20% 33% 44% 30%
From 1 October - 30 November 2023
Number of exit interviews
conducted 9 10 1 2 10 32
Total no. of leavers per Resource
eligible for an exit interview 29 34 9 15 32 119
% of leavers interviewed 31% 29% 11% 13% 31% 27%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
55

Page 56

Appendix 14
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
3448 2072 343 60% 10% 17%
954 342 95 36% 10% 28%
2474 771 245 31% 10% 32%
91 46 9 51% 10% 20%
3061 980 306 32% 10% 31%
358 127 31 35% 9% 24%
3112 1032 334 33% 11% 32%
304 80 6 26% 2% 8%
21 13 0 62% 0% 0%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
2487 766 172 31% 7% 22%
710 219 48 31% 7% 22%
1767 542 115 31% 7% 21%
80 46 5 58% 6% 11%
2049 628 134 31% 7% 21%
410 135 30 33% 7% 22%
2134 682 158 32% 7% 23%
317 73 4 23% 1% 5%
29 20 0 69% 0% 0%
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 October - 30 November 2024
Total Number of applications received: 3465
Total Number of Equal Opportunities Monitoring forms received: 3448
Total Number of posts advertised: 160
Total Number of appointments: 354
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
From : 1 October - 30 November 2023
Total Number of applications received: 2570
Total No of applicants aged under 50
Total Number of Equal Opportunities Monitoring forms received: 2487
Total Number of posts advertised: 281
Total Number of appointments: 198
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
56

Page 57

Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3439 1244 384 235 1576 2471.12 5.00 1711.95 415.46 269.47 48.94 18.30 0.00 2.00 0.00
Education - Others 3255 104 95 587 2469 2530.85 5.00 1240.13 1087.44 137.72 48.60 11.00 0.00 0.96 0.00
Education - Teachers 4034 711 114 2177 1032 3600.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3600.11
Finance & Corporate Resources 822 183 24 366 249 730.03 8.00 93.90 341.81 210.36 53.96 22.00 0.00 0.00 0.00
Housing & Technical 1396 774 120 334 168 1284.40 3.00 196.94 674.12 365.25 33.09 10.00 0.00 2.00 0.00
Social Work Resources 2780 194 225 964 1397 2398.98 3.00 332.61 1455.57 508.52 64.77 33.51 0.00 1.00 0.00
9415.38 (excluding Teachers)
Total All Staff 15726 3210 962 4663 6891 13015.49 24.00 3575.53 3974.40 1491.32 249.36 94.81 0.00 5.96 3600.11
Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3173 1237 275 233 1428 2245.16 5.00 1531.38 382.28 258.25 46.55 16.70 0.00 5.00 0.00
Education - Others 3246 117 103 613 2413 2352.33 5.00 1089.86 999.77 134.44 46.00 10.00 0.00 62.46 4.80
Education - Teachers 3885 691 80 2189 925 3498.55 0.00 0.00 0.00 0.00 0.00 1.00 0.00 4.60 3492.95
Finance & Corporate Resources 772 183 14 364 211 701.50 8.00 90.61 326.03 202.14 51.72 23.00 0.00 0.00 0.00
Housing & Technical 1268 779 25 332 132 1208.19 3.00 193.51 631.52 341.56 29.60 9.00 0.00 0.00 0.00
Social Work Resources 2689 195 207 988 1299 2354.75 3.00 323.31 1441.76 494.47 59.30 32.91 0.00 0.00 0.00
8861.93 (excluding Teachers)
Total All Staff 15033 3202 704 4719 6408 12360.48 24.00 3228.67 3781.36 1430.86 233.17 92.61 0.00 72.06 3497.75
Male Female Salary Band
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
Analysis by Resource
Quarterly Joint Staffing Watch Return : Number Employed On 14 September 2024
Analysis by Resource
Quarterly Joint Staffing Watch Return : Number Employed On 11 June 2024
Appendix 15
Total Number of Employees Full-Time Equivalent
57

Page 58

58

Page 59

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Treasury Management Activity – 2024/2025 Third
Quarter Review 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a third quarter review of Treasury Management Activity for 2024/2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted.
[1recs]
3. Background
3.1 In order to provide members with information on the Council’s Treasury Management
activities, a quarterly report is presented to this Committee.  This report covers the
period 1 April 2024 to 31 December 2024. 
4. Market Performance
4.1. At the time of writing the base rate was 4.75% and the Bank of England Asset
Purchase Programme (commonly referred to as its policy of quantitative easing) was
£655bn.  The Council’s Treasury Management Advisers are predicting that the base
rate will fall to 4.50% by March 2025. 
5. Debt Management and Borrowing Strategy
5.1. The Council began the year with debt of £1,034.532 million with fixed rate loans from
the Public Works Loans Board (PWLB) making up 97.25% of the debt. 
5.2. Table 1 shows the movement in borrowing from 1 April 2024 to 31 December 2024. 
Table 1 – Movement in Borrowing to 31 December 2024 
Balance as
at
01/04/2024
£m 
New
Borrowing
£m 
Debt
Maturing
£m 
Debt
Repaid
£m 
Balance as
at
31/12/2024
£m
Increase/
Decrease
in
Borrowing
£m
Short Term
Borrowing 53.770 52.000 (56.486) 0.00 49.284 (4.486)
Long Term
Borrowing 980.762 0.000 0.00 0.00 980.762 0.000
TOTAL
BORROWING 1,034.532 52.000 (56.486) 0.00 1,030.046 (4.486)
7
59

Page 60

5.3. Short term borrowing reflects borrowing which will mature in the coming year, or
where the debt can be recalled in the coming year. 
5.4. In 2012/2013, HM Treasury introduced a “certainty rate” to enable eligible local
authorities to access cheaper PWLB funding, with a 20 basis point (0.20%) reduction
on the standard rate.  South Lanarkshire Council has access to this reduced rate. 
5.5. The Council has an expected funding requirement of £142.217 million for 2024/2025. 
5.6. The Executive Director (Finance and Corporate Resources), under delegated
powers, will continue to take the most appropriate form of borrowing depending on
the prevailing interest rates at the time, taking into consideration the differential
between investment earnings and debt costs that remains high. 
5.7. No long term borrowing has been taken so far in the current financial year as interest
rate forecasts show an expectation that rates will decrease over the next two to three
years.  Instead, short term borrowing has been taken to ensure that the Council has
sufficient cash available to meet its Revenue and Capital expenditure requirements. 
5.8. As shown in Table 1, total borrowing of £1,030.046m as at 31 December remains
below both the Capital Financing Requirement and Authorised Limit for Debt for
2024/2025, as reported to and approved by South Lanarkshire Council on 21
February 2024.  This is outlined further in Section 9. 
6. Investment Activity
6.1. On a daily basis, the Treasury Management section within Finance and Corporate
Resources manages the Council’s cash balances.  These balances can result from
day-to-day cash flow situations where income has been received before expenditure
has taken place, and from the balances held in earmarked reserves for use at a later
date.  It is the responsibility of the section to manage these funds.  The primary
consideration when making deposits is the security of funds. Secondary to this,
consideration is given to ensuring we have access to funds when necessary, and
that these funds are working as well as they can for the Council. 
6.2. The Prudential Indicators, Treasury Management Strategy and Annual Investment
Strategy Report for 2024/2025 was approved by South Lanarkshire Council on 21
February 2024.  This included details of permitted investments for the Council. 
6.3. Prior to depositing funds with any bank or building society, checks are made with the
Council’s treasury adviser, Link Asset Services, that the institution is considered safe
and that any deposit conforms to their recommended time duration as determined by
their Rating Methodology.  This methodology uses credit ratings, rating watches and
outlooks and credit default swap (CDS) prices to establish a suggested time duration
for deposits. 
6.4. Deposits made in the period 1 April 2024 to 31 December 2024 totalled
£1,265.472 million.  This is the cumulative deposits placed over this period.  This is
broken down per sector and institution in Table 2. 85.11% of these deposits were
made with the UK Government through the Debt Management Office (DMO) deposit
facility.  
60

Page 61

6.5. In order to manage their cash flow over the short term, local authorities, as part of
normal treasury management activity, will place money on deposit with other local
authorities.  Deposits placed with other local authorities account for 9.09% of
deposits.  The remaining 5.80% was placed in instant access call accounts with
Bank of Scotland. 
Table 2 – Investment Activity 1 April 2024 to 31 December 2024 
Counterparty
Deposit
Totals (£m)
% of
Total
Deposits
Average
Interest
Rate
Deposits in UK Government   
Debt Management Account Deposit
Facility 1,077.100 85.11% 5.02%
Total Deposits in UK Government 1,077.100 85.11% 5.02%    
Deposits in UK Local Authorities 115.000 9.09% 5.12%    
Deposits in UK Banks and Building
Societies:   
Bank of Scotland 73.372 5.80% 5.00%
Total Deposits in UK Banks and
Building Societies 73.372 5.80% 5.00%
Total Deposits 01/04/2024 to 31/12/2024 1,265.472 100.00% 5.03% 
6.6. The average interest rates achieved from the deposits are also shown in Table 2. 
Interest rates achievable for deposits have been decreasing since the base rate was
first cut in August 2024.  There is still a differential between these and the rates at
which the Council can borrow. 
6.7. Actual deposits as at 31 December 2024 totalled £30.446 million. 
7. Management of Risk
7.1. It is recognised that no Treasury Management activity is without risk and practices
are put in place in order to limit risk.  As noted in section 6.2, the Treasury
Management Strategy was approved in February 2024 and set a framework for
Treasury Management activities in 2024/2025.  It also set limits on debt and
investments in order to mitigate risks. 
7.2. The Annual Investment Strategy for 2024/2025, also approved in February 2024,
included details on how risk would be managed for all permitted investments.  This
included criteria for placing deposits with the Debt Management Office (DMO), UK
Local Authorities, Banks and Building Societies and Money Market Funds. 
7.3. Part of the criteria for counterparties is meeting minimum credit ratings with the three
main rating agencies.  A credit rating evaluates the credit worthiness of an
organisation.  It is an evaluation made by a credit rating agency of the organisation’s
ability to pay back the debt and the likelihood of default.  
61

Page 62

7.4. Tables 3 to 5 show a breakdown of deposits with details of the credit ratings of banks
and building societies used from 1 April 2024 to 31 December 2024.  Deposits with
the DMO are with the UK Government and so have a rating equivalent to the UK’s
sovereign rating.  Deposits with local authorities are considered to be of very high
credit quality. 
Table 3 – Fitch Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA-) 1,077.100m 85.11%
Deposits with Local Authorities 115.000m 9.09%
AA- F1+ 18.004m 1.42%
A+ F1 55.368m 4.38%
Total  1,265.472m 100.00% 
Table 4 – Moody’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (Aa3) 1,077.100m 85.11%
Deposits with Local Authorities 115.000m 9.09%
A1 P-1 73.372m 5.80%
Total  1,265.472m 100.00% 
Table 5 – Standard and Poor’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA) 1,077.100m 85.11%
Deposits with Local Authorities 115.000m 9.09%
A+ A-1 73.372m 5.80%
Total  1,265.472m 100.00% 
7.5. The tables above show that 94.20% of deposits were made with counterparties of
very high credit quality (DMO/UK Government and other local authorities).  The
remaining 5.80% were deposits in instant access accounts with Bank of Scotland. 
7.6. The graph at Appendix 1 shows the duration of deposits made from 1 April 2024 to
31 December 2024.  The graph shows that, since 1 April 2024, all deposits have
been made for 1 year or less.  The maximum maturity period of 113 days was for a
deposit of £10.000 million to a local authority. 
8. Next Quarter Investment Plans
8.1. The current investment framework will be continued in the next quarter.  Deposits will
continue to be placed with the institutions where their ratings are consistent with the
Council’s approved criteria.  Deposits will also continue to be placed with the DMO
and UK local authorities. 
8.2. Treasury Bills will be used when they return a higher yield than deposits in the DMO
for the same, very low risk. 
62

Page 63

8.3. We will continue to work with our Treasury Management Advisers, Link, to ensure
we gain all information available on counterparties before any deposits are made. 
9. Treasury Management Indicators
9.1. The purpose of these indicators is to contain the activity of the treasury function
within certain limits, thereby managing risk and reducing the impact of an adverse
movement in interest rates.  However, if these are set to restrictive limits, they will
impair the opportunities to reduce costs/improve performance.  The indicators are
detailed in sections 9.2 to 9.5. 
9.2. Limits for External Debt: The operational and authorised limits for external debt for
2024/2025 were set in the Prudential Indicators, Treasury Management Strategy and
Annual Investment Strategy 2024/2025 approved by South Lanarkshire Council on
21 February 2024.  These are shown in Table 6, along with a column showing the
difference between the actual debt level and the limits (headroom). 
Table 6 – Limits for External Debt 
Estimate as
per 2024/25
Strategy
Minimum
Headroom
to Limits in
period
Headroom
as at
31/12/2024 
£m £m £m
Operational Limit for external debt 1,410.000 375.468 379.954
Authorised Limit for external debt 1,430.000 395.468 399.954 
9.3. The indicator shows that we have not breached the operational and authorised limits
to 31 December 2024.  There has been a minimum level of headroom of £395.468
million between actual and authorised level for external debt in the period to 31
December 2024. 
9.4. Limits on Maturity Structure: By setting limits on the maturity structure of
borrowing, the exposure to large concentrations of debt needing to be replaced at
the same time in the future at currently unknown rates can be limited.  This
effectively places a limit on exposure to longer term interest rate movement. This is
shown in Table 7. 
Table 7 – Limits on Maturity Structure 
Maturity Structure of Borrowing  
Upper
Limit 
Lower
Limit
Maximum
for period
to 31/12/24 
Actuals as
at 31/12/24
Under 12 months 30% 0% 5.20% 4.78%
12 months and 24 months 40% 0% 12.11% 11.62%
24 months and 5 years 50% 0% 3.92% 3.76%
5 years and 10 years 60% 0% 21.41% 20.54%
10 years and 20 years 60% 0% 19.13% 18.35%
20 years and 30 years 70% 0% 15.36% 14.73%
30 years and 40 years 80% 0% 27.33% 26.22%
40 years and 50 years 90% 0% 0.00% 0.00%
50 years and above 90% 0% 0.00% 0.00%  
63

Page 64

9.5. The indicator shows that the upper limits for all maturity profiles have not been
breached to 31 December 2024. 
10. Employee Implications
10.1. There are no employee implications. 
11. Financial Implications
11.1. The current rate of interest receivable remains relatively low but has increased over
recent months. Any deposit interest received offsets Loan Charges made to the
Council’s Revenue budget. 
11.2. The costs of borrowing for capital expenditure have been built into the long-term
Revenue Budget Strategy. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no implications for climate change or sustainability in terms of the
information contained in this report. 
12.2. There is also no requirement to carry out an environmental impact assessment in
terms of the information contained within this report. 
13. Other Implications (Including Environmental and Risk Issues)
13.1. Section 7 of this report provides details of how investment risk is managed. 
14. Integrated Impact Assessment and Consultation Requirements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
14.2. There is no requirement to carry out any consultation in terms of the information
provided in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy
2024/2025, South Lanarkshire Council, 21 February 2024
 Treasury Management Activity – 2024/2025 Second Quarter Review, Finance and
Corporate Resources Committee, 30 October 2024 
List of Background Papers
 None  
64

Page 65

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
65

Page 66

Appendix 1
66

Page 67

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resource Plan: 
Quarter 2 Progress Report 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Finance and Corporate Resource Plan Quarter 2 Progress Report
2024/2025, for the period 1 April 2024 to 30 September 2024
e]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Finance and Corporate Resource Plan Quarter 2 Progress Report
2024/2025 as summarised in paragraph 5.2. and attached as Appendix 2 of
this report, be noted;
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3. of this report, be noted; and
(3) that the areas for improvement and associated management actions as
detailed in paragraph 5.4. of this report, be noted. 
3. Background
3.1. The Finance and Corporate Resource Plan 2024/2025 was approved by this
Committee on 22 May 2024 and sets out the outcomes, measures and actions to be
managed and delivered by the Resource for the financial year 2024/2025. 
3.2. The Resource Plan follows the agreed corporate structure and style.  The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2024/2025
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2024/2025.  These are detailed at Appendix 1. 
5. Quarter 2 Progress Report 2024/2025
5.1. Progress against all Resource Plan measures is contained in the Quarter 2 Progress
Report 2024/2025, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:-
8
67

Page 68

Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report. 
The overall summary of progress to date is set out in the table below. 
Status Measures
Statistical  Project  Total %
Blue N/A 1 1 3%
Green  16 11 27  72%
Amber  3 0 3   8%
Red     1 1 2   6%
Report later/Contextual 0 4 4    11%
Totals  20 17 37 100%  
(Data correct as at 29 Nov 2024)  
5.3. Key achievements to date for 2024/2025 are noted below:- 
5.3.1. 
Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
Individuals and
communities in South
Lanarkshire are
engaged and able to
participate in decision-
making processes
The Community Wish List has continued to thrive, with 48
Community Wishes received from a range of community groups
across South Lanarkshire. 10 Wishes have been answered, with
a range of financial donations, goods and materials, Christmas
decorations, and food items, totalling £11,690. To date this
financial year, the project has totalled over £21,000. 
Connect Outcome  Education and Learning
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Health and Wellbeing 
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome
68

Page 69

Connect Outcome:  Children and Young People
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome:  Housing and Land
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
Connect Outcome  Our Economy
Resource
Outcome
Achievement 
No Resource Outcomes for this Connect Outcome 
5.3.2. In addition to working towards these Outcomes, we recognise that the Council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and achieving Best Value
Resource
Outcome
Achievement 
Customers
experience high
quality and
improving council
services
Nothing to report this Quarter
The council
demonstrates high
standards of
governance and
sound financial
stewardship
Audited Accounts were produced and received a clean audit
certificate. These were approved for signature by the Risk and
Audit Scrutiny Committee before the submission date of 30
September 2024.
The workforce has
the skills, flexibility
and capacity to
deliver the council’s
priorities.
During the period 1 April 2024 – 30 September 2024, SLC
employees completed 35,326 eLearning modules. 
In the same period, 3,675 employees attended 468 classroom-
based events, and 624 employees attended 70 virtual online
events.
Digital and ICT
service meet the
needs of the council
and its customers
With assistance from the Local Government Improvement
Service, the council developed an SLC-focused LGBF dashboard
reflecting the council's strategic outcomes as set out in the
Council Plan, Connect.  Following presentation at the
Performance and Review Scrutiny Forum (PRSF) on 28 May
2024, the dashboard was made available to the public via a link
on the performance pages of the council's website.
Oracle Fusion - HR and Payroll modules went live August 2024.
69

Page 70

5.4. Areas for improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why and the
management actions now being taken, where applicable. 
Delivering the plan and achieving Best Value
Resource Outcome:   Customers experience high quality and improving council
services
Measure  Comments/Progress Action by Manager 
(where applicable)
Money Matters Advice –
to write off 20% of
all debt dealt with by
bankruptcy or creditor
write offs 
This is a new reporting
measure which was
introduced in 2024-25.
Performance to date has
only reached 15.3%,
short of the challenging
20% target. 
This is a new target set for 2024-25
with 20% based on the 23% that was
achieved in 2022-23. The level of debt
written off by creditors for clients is
dependent on a variety of factors
including the type of debt involved and
the range of debt solutions available.
Money Matters offer options on debt
solutions to support the client and
explain the implications of each,
however the selection of any one
solution is a decision for the client to
take. Also, once a debt solution is
selected, there can be a time delay
between verifying the debt and a
successful solution being
implemented and this can also impact
performance.
Migrate to new Social
Work Information system
Positive progress has
been made in the design,
implementation and
testing of the new
system; however, data
and test issues have
been identified in key
areas of the project
which have resulted in
significant pressures on
the project plan. This has
led to an unavoidable
delay to the current
planned implementation
date and a project re-
planning exercise is now
taking place. Once the
re-planning exercise
concludes in October, a
new implementation date
will be proposed and
agreed.
Good progress continues to be made
in the implementation and testing of
the new system. There has been an
increased use of functional resource
to bolster capacity across the project,
including an increased Steering Group
and Project Board membership to
further enhance stakeholder
engagement. Following a
comprehensive re-planning exercise
that considered internal and external
factors for a successfully go-live, such
as year-end activities, a proposed
revised go-live date of June 2025 has
been agreed by the Project Review
Board. 
70

Page 71

5.5.  Report later
Measures in the quarterly progress reports which are not blue, red, amber or green
can be assigned a status of ‘report later’ or ‘contextual’.  A further analysis,
introduced to aid scrutiny of performance, is to follow up the measures in these
categories from the Quarter 4 2023/2024 report.  There were no measures identified
as ‘report later’ or ‘contextual’ in that report so no further action or analysis is
required. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2024-25. 
9.  Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register.
.
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2.  There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 December 2024 
Link(s) to Council Values/Outcomes/Priorities
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027
71

Page 72

Previous References
 Finance and Corporate Resources Quarter 2 Progress Report 2023-24 
List of Background Papers
 Council Plan Connect 2022 to 2027 – approved by the full Council on 15 June 2022
 Finance and Corporate Resource Plan 2024/2025 – approved by Finance and
Corporate Resources Committee on 22 May 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little (Head of Communications and Strategy)
Ext:  4904 (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk
72

Page 73

Appendix 1 
Finance and Corporate Resource Outcomes 2024-25  
Connect Outcomes  Resource Outcomes
Communities and
Environment 
• Individuals and communities in South Lanarkshire are engaged
and able to participate in decision-making processes
Education and
Learning 
• No Resource Outcomes for this Connect Outcome
Health and
Wellbeing 
• No Resource Outcomes for this Connect Outcome
Children and Young
People 
• No Resource Outcomes for this Connect Outcome
Housing and Land  • No Resource Outcomes for this Connect Outcome
Our Economy  • No Resource Outcomes for this Connect Outcome 
Delivering the Plan
and achieving Best
Value
• The council demonstrates high standards of governance and
sound financial stewardship
• Customers experience high quality and improving council
services
• The workforce has the skills, flexibility and capacity to deliver the
council’s priorities
• Digital and ICT services meet the needs of the council and its
customers 
73

Page 74

74

Page 75

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 10 Dec 16:18
Quarter 2 : April 2024 - September 2024
South Lanarkshire Council
Finance and Corporate Resources
Resource Plan
(This represents the cumulative position to September 2024)
Performance Report 2024-25
8
75

Page 76

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 10 Dec 16:18
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 0 0 0 0 0
Education and Learning 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 0 0 0 0 0
Delivering the plan and achieving best value 16 3 1 0 20
Total 16 3 1 0 20
Page 1
76

Page 77

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Pay invoices within the target of 28 days Payment of invoices continues to make steady progress since Oracle
Fusion went live on 1 April: the Payables team continue to work closely
with Resources to improve performance on invoice holds
Amber 92.5% 91.0% 93.4% 91.7% 94.0%
Percentage of income due from Council
Tax received by the end of the year - in
year (incl water)
The annual Council Tax collection target for 2024/2025 has been set at
95.5%. Council Tax collection rate is currently 60.19%, ahead of target
by 0.06% and ahead of comparable performance in 2023/24 by 0.07%.
Green 95.50% 60.19% 95.54% 96.77% 95.70%
% of Non Domestic rates income achieved Non Domestic rates collection is currently 48.7%, equal to the Q2 target. Green 97.5% 48.7% 97.5% 97.8% 97.8%
Sundry Income collection To date, a collection rate of 97.5% has been achieved, equal to target. Green 97.5% 97.5% 98.1% 98.3% 96.9%
Liquor licensing processing target - 97%
within service targets
Whilst the PI has not been met, performance has improved on a monthly
basis, with July being 61%, August 84% and September 94%. We will
continue to ensure that priority is given to urgent, time critical service
requests.
Amber 97.0% 79.0% 92.0% 96.0% 94.0%
Registration processing target - 97.5%
within service targets
Whilst the PI target has not been met, performance has improved on a
monthly basis, with July being 77%, August 77% and September 91%.
We will continue to ensure that priority is given to urgent, time critical
service requests.
Amber 97.5% 89.0% 93.0% 99.0% 99.0%
Citizenship processing target - 97.5%
within service targets
Target has been achieved Green 97.5% 100.0% 100.0% 100.0% 100.0%
Complaints processing target - 97.5%
within service targets
Target has been achieved Green 97.5% 100.0% 100.0% 100.0% 100.0%
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Customer Service Centre - % of calls
answered
Target exceeded Green 90.00% 93.00% 93.00% 94.00% 91.00%
Customer Service Centre – average queue
time (in seconds)
Target exceeded Green 300 212 158 134 252
Benefits administration – average
processing times for new Housing Benefit
and Council Tax Reduction claims
Processing times for new claims is currently 10 days, 4 days under
target with annual target of 14 days expected to be achieved.
Green 14 days 10 days 13 days 12 days 11 days
Benefits administration – average
processing times for Housing Benefit and
Council Tax Reduction change in
circumstances
Processing times for change in circumstances is currently 3 days, 1 day
under target with annual target of 4 days expected to be achieved.
Green 4 days 3 days ------ ------ 2 days
Page 2
77

Page 78

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 10 December 2024
Resource Plan Performance Indicators South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Housing Benefit and Council Tax
Reduction – accuracy of processing
Accuracy performance is currently 95.3%, exceeding the target. Green 94.5% 95.3% 94.4% 97.1% 95.8%
Scottish Welfare Fund – average
processing times for Crisis Grants
Processing times for Crisis Grants is currently equal to target. Green 2 days 2 days 2 days 2 days 2 days
Scottish Welfare Fund – average
processing times for Community Care
grants
Processing times for Community Care Grants is currently under target by
2 working days.
Green 15 days 13 days 16 days 13 days 17 days
Money Matters Advice – customer service -
% cases responded to within 5 days of
initial customer contact
high percentage of client's continue to receive advice or emergency
intervention at contact and where more expert advice required we are
contacting within the 5 working day target.  Response times remain on
course to achieve this target.
Green 95.00% 98.60% ------ ------ 98.00%
Money Matter Advice – to write off 20% of
all debt dealt with by bankruptcy or creditor
write offs (New)
This is a new target set for 2024-25 with 20% based on the 23% that
was achieved in 2022-23. The level of debt written off by creditors for
clients is dependent on a variety of factors including the type of debt
involved and the range of debt solutions available. Money Matters offer
options on debt solutions to support the client and explain the
implications of each, however the selection of any one solution is a
decision for the client to take. Also, once a debt solution is selected,
there can be a time delay between verifying the debt and a successful
solution being implemented and this can also impact performance.
Red 20.0% 15.3% 0.0% 0.0% 0.0%
Money Matters Advice – 85% of all claims
for benefits to be successful (New)
On target to achieve this by year end Green 85.0% 88.2% 0.0% 0.0% 0.0%
Complete food and fuel bank referrals
within 24 hours of request (New)
Efforts to maintain this target remain high against increasing call
volumes.
Green 95.0% 99.2% 0.0% 0.0% 0.0%
Make Financial Wellbeing Support Fund
(FWSF) Cash First payments within 24
hours of request (New)
On target to achieve by year end Green 95.0% 97.4% 0.0% 0.0% 0.0%
Page 3
78

Page 79

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 0 5 0 0 0 5
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 0 0 0 0 0
Children and Young People 0 0 0 0 0 0
Housing and Land 0 0 0 0 0 0
Our Economy 0 0 0 0 0 0
Delivering the plan and achieving best value 1 6 0 1 4 12
Total 1 11 0 1 4 17
Page 4
79

Page 80

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Communities and Environment
Individuals and communities in South Lanarkshire are engaged and able to participate in decision-making processes
Action Measures Comments/ Progress Status
Increase routes for
communities to
participate in decision
making and priority
setting
Increase activity around our Place Based Participatory
Budgeting programme in priority neighbourhoods
Participatory budgeting (PB) activity has been undertaken in nine
neighbourhood planning areas, leading to the investment of £160,000
from South Lanarkshire Council and the UK Governments Shared
Prosperity fund. 8,359 residents took part in public votes allocating
funds and investing in 49 community led projects.
Green
Increase the number of communities with their own
community-led neighbourhood plans
Nine neighbourhood plans are in place and being delivered upon. One
new plan for Whitehills in East Kilbride is in development.
Green
Implement new approaches to community involvement in
decision making such as a community Wishlist approach to
community benefits
The Community Wish List has continued to thrive, with 48 Community
Wishes received from a range of community groups across South
Lanarkshire. 10 Wishes have been answered, with a range of financial
donations, goods and materials, Christmas decorations, and food
items, totalling £11,690. to date this financial year, the project has
totaled over £21,000.
Green
Take forward IT strategic
developments
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements, including improved
availability and affordability of broadband and 4G/5G mobile
services across the council area
Revised business case developed and under consideration. Green
Develop action plan on Digital Inclusion as key stakeholder
of the Digital Inclusion sub-group.
Digital inclusion subgroup terms of reference revised and action plan
agreed for 2024-25.
Green
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Action Measures Comments/ Progress Status
Lead financial planning
and reporting for the
council
Financial Strategy to be agreed by June 2024 The Council's Revenue Budget Strategy for 2025/2026 to 2027/2028
was approved by the Council's Executive Committee on 26 June 2024.
This will be updated during the year as required.
Green
Budget proposals to be considered by members by
December 2024
A Members' Seminar and Budget Strategy update to Executive
Committee are scheduled for November where savings proposals will
be presented for consideration.
Report Later
Page 5
80

Page 81

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
The council demonstrates high standards of governance and sound financial stewardship
Action Measures Comments/ Progress Status
Budget agreed by March 2025 Work is ongoing to meet the Budget Setting deadline of March 2025. Report Later
Capital programme for 2025-26 to be agreed by March 2025 Work has commenced on drafting a capital programme for 2025/2026,
with a view to presenting this to members for approval by March 2025.
Report Later
Take forward IT strategic
developments
To further develop SLC’s approach to and engagement with
the LGBF, create a be-spoke version of the Local
Government Improvement Service LGBF dashboard to
enhance the analysis and presentation of LGBF results.
With assistance from the Improvement Service, the council developed
an SLC-focused LGBF dashboard reflecting the council's strategic
priorities as set out in the Council Plan, Connect.  Following
presentation at the PRSF on 28 May 2024, the dashboard was made
available to the public via a link on the performance pages of the
council's website.
Complete
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Provide effective and
responsive customer
services
Continuous improvement in the provision and uptake of
digital customer contact options
Improvement Group has not yet commenced Report Later
Monitor the progress of
transformation projects
through reporting
framework to CMT
Report progress of transformational projects regularly to
CMT
Project has concluded the first cycle of transformational reviews
through the CMT framework, to agree and deliver proposed savings to
the 2025-26 Budget. The project remains ongoing, with further
transformational reviews being reported on throughout 2024-25.
Green
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Take forward IT strategic
developments
Migrate to new Integrated Housing and Property
Management system
Project remains on track for go live early 2025. Green
Page 6
81

Page 82

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Tuesday 10 December 2024
Resource Plan actions and measures South Lanarkshire Council - Finance and Corporate Resources
Delivering the plan and achieving best value
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Develop and deliver training plan to upskill IT staff in new
technologies
Training requirements identified for the Service and underway. Green
Migrate to new Social Work Information system Positive progress has been made in the design, implementation and
testing of the new system, however data and test issues have been
identified in key areas of the project which have resulted in significant
pressures on the project plan. This has led to an unavoidable delay to
the current planned implementation date and a project re-planning
exercise is now taking place. Once the re-planning exercise concludes
a new implementation date will be proposed and agreed.
Red
Migrate all analogue telephony services to technology to
align with Ofcom 2025 switch off
Project remains on track. Green
Migrate to new Fusion platform, Oracle’s cloud-based
Human Resources (HR) and Finance solution.
HR and Payroll modules went live August 2024. Green
Page 7
82

Page 83

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Collection and Approval for Write Offs 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise Committee of Revenue Collection performance for financial year
2024/2025 to 30 November 2024
 advise Committee of the position regarding the Non Domestic Rates
Incentivisation Scheme (NDRIS) for financial year 2024/2025 
 seek approval for write offs 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that performance in the collection of revenue be noted;
(2) that the current position in respect of NDRIS be noted; and
(3) that write offs for the following be approved:-
 Council Tax  £137,887.68
 Non-Domestic Rates £362,563.33
 BID Levy £1,794.44
 Sundry Debt  £20,759.45
 Housing Rent and associated charges £975,564.29  
3. Background
3.1. Responsibility for the collection of Council Tax, Non-Domestic Rates (NDR) and
Sundry Debt is the responsibility of Finance and Corporate Resources.  This report
and the attached appendix provide information on collection performance and
proposals for write off. 
4. Current Collection Performance
4.1. The first table in Appendix 1 presents the collection performance for Council Tax,
NDR and Sundry Debts for financial year 2024/2025. 
4.2. The annual Council Tax collection target for 2024/2025 has been set at 95.5%.
Council Tax collection is currently 79.17%, ahead of target by 0.10% and ahead of
comparable performance in 2023/2024 by 0.11%. 
4.3. Council Tax performance is reported nationally on a line by line basis, which adjusts
for the impact of Scottish Water billing and collection.  For information, the equivalent
level of Council Tax collection at 30 November 2024 when Scottish Water debts are
removed is 79.69%. 
9
83

Page 84

4.4. A Non-Domestic Rates (NDR) collection target of 97.5% has been set for 2024/2025.
NDR collection is currently 66.6%, equal to target and behind comparable
performance in 2023/2024 by 1.4%.  The reduction in comparable performance is
due to the profile of payments received in comparison with the same period last year. 
4.5. The 2024/2025 annual target for Sundry Debt collection has been set at 97.5%. 
Sundry Debt collection to 30 November 2024 was 97.8%, ahead of target by
0.3%.and ahead of comparable performance in 2023/2024 by 0.7%. 
5. Arrears Collection Performance
5.1. Arrears collection performance for Council Tax, NDR and Sundry Debt is presented
in the second table of Appendix 1. 
5.2. The 2024/2025 arrears annual target for Council Tax has been set at £3.000 million,
with collection to 30 November 2024 of £2.857 million, ahead of target by
£0.593 million (19.8%) and ahead of comparable performance in 2023/2024 by
£0.621 million. 
5.3. The 2024/2025 arrears target for NDR has been set at £2.000 million, with collection
to 30 November 2024 of £3.052 million, ahead of target by £1.132 million (56.6%)
and ahead of comparable performance in 2023/2024 by £1.082 million. 
5.4. The 2024/2025 arrears target for Sundry Debt has been set at £10.153 million, with
collection to 30 November 2024 of £7.563 million, behind target by £1.118 million
and behind comparable performance in 2023/2024 by £0.962 million. 
6. Non Domestic Rates Incentivisation Scheme
6.1. The Non Domestic Rates Incentivisation Scheme (NDRIS), formally known as the
Business Rates Incentivisation Scheme is a Scottish Government initiative to
incentivise growth of the local business tax base, with a view to increasing NDR
income yields. 
6.2. The Scottish Government sets annual targets for growth (buoyancy) and Councils
who achieve their target retain 50% of the additional income generated above the
target.  The buoyancy target is a measure of the increase in the total rateable value
of the non-domestic properties on the Valuation Roll (including certain categories of
public undertakings). 
6.3. The provisional annual buoyancy target for South Lanarkshire Council in 2024/2025
has been set by the Scottish Government at 0.9%.  This is a measure of the increase
in the total rateable value of the non-domestic properties on the Valuation Roll
(including certain categories of public undertakings). 
6.4. Performance against the NDRIS target will be reported to Committee on a quarterly
basis.  Buoyancy to the end of December 2024, was 0.76%. 
6.5. The tax base must achieve growth of more than 0.14% during the last quarter of the
financial year to secure additional income under the scheme. 
7. Proposals for Write Off
7.1. Approval for write off of the following irrecoverable debts is requested from
Committee. The Council has the power to write off accounts where the debtor is
deceased, sequestrated, in liquidation or the debt is prescribed or where the debt is
deemed uneconomical to pursue. 
84

Page 85

7.2. The proposed write off of Council Tax accounts dating from 1993/1994 to 2024/2025
totals £137,887.68 relating mainly to prescribed debt, sequestrations and estates of
the deceased. 
7.3. The value of accounts currently marked for write off in the Non-Domestic Rates
system from rating years 2022/2023 to 2024/2025 totals £362,563.33.  These debts
are deemed to be irrecoverable because the debtor is in liquidation, has ceased
trading or has been sequestrated. 
7.4. Approval is sought for the write off of Business Improvement District (BID) Levies
totalling £1,794.44, administered by the Council on behalf of the Hamilton, Carluke
and Lanark BID companies.  There is no financial impact on the Council for these
write offs. 
7.5. Following consultation and agreement with Resources, the proposed write off of
Sundry Debt totals £20,759.45.  Appendix 2 provides a breakdown of the proposed
write-off over categories. 
7.6. Approval is sought for the write off of former tenant rent arrears of £960,143.89
(including bulk write offs for financial year 2024/2025 for temporary accommodation),
factoring arrears of £2,838.29 and Housing Benefit Overpayments of £12,582.11. 
7.7. A full list of all debts proposed for write off is held by the Executive Director (Finance
and Corporate Resources). 
8. Employee Implications
8.1. None. 
9. Financial Implications
9.1. Provision has been made for the financial impact of all write offs. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
11. Other Implications
11.1. The main risk associated with the Council’s revenue collection is a failure to monitor
collection rates and take effective corrective action where required, resulting in a
significant reduction in collection performance and Council funding. The risk is
managed through monthly performance reporting and review of performance at
monthly Senior Management Meetings. 
11.2. There are no implications for sustainability in terms of the information contained in
this report. 
12. Integrated Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
85

Page 86

12.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Finance and Corporate Resources Committee - 30 October 2024 
List of Background Papers
 System Reports from Council Tax, Non-Domestic Rates, Sundry Debt and Academy
Housing 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
86

Page 87

Appendix 1        
SOUTH LANARKSHIRE COUNCIL        
REVENUES COLLECTION        
FOR PERIOD ENDING 30 NOVEMBER 2024         
Annual Budget           
Cash Target  Actual Variance   % Variance   
Budget to 30/11/24 to 30/11/24 to 30/11/24   to  Notes 
£000's £000's £000's £000's    annual budget          
FINANCIAL YEAR 2024/2025       
Council Tax 156,920 129,760  129,918  158 over 0.10% 
Non-Domestic Rates 387,085     264,409      264,267         (142) under 0.0% 
Sundry Debt 110,356  110,356  110,715  359 over 0.3% 
ARREARS        
Council Tax 3,000  2,264 2,857 593 over  19.8% 
Non-Domestic Rates 2,000    1,920  3,052      1,132 over 56.6% 
Sundry Debt       10,153       8,681       7,563      (1,118)       under         -11.0% 
87

Page 88

Appendix 2 
BREAKDOWN OF PROPOSED
SUNDRY DEBT WRITE-OFF 
Resource Service No. of Accounts Value (£)
Housing & Technical Estates  17                 11,540.29
Social Work Residential / Non-Residential                       3                   2.627.22
Community and Enterprise Care of Gardens / Bereavement 2                      519.47
Education  Education General  9                   2,862.26
Finance & Corporate Housing Benefit Overpayments /
Buildings Insurance / Sundry Income 
5    3,210.21 
Total 36  20,759.45 
88

Page 89

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Consultation on a Proposal to Increase Scottish Social
Services Council Registration Fees 
1. Purpose of Report
1.1. The purpose of this report is to:-
 provide an update on the Scottish Social Services Council (SSSC) consultation
on the proposal to increase registration fees
 provide an update on the Council’s response to the consultation 
2. Recommendation(s)
2.1. The Committee is asked to note the following recommendation(s):- 
(1) that the response submitted to the SSSC on 23 December 2024 as detailed in
Appendix 1 be noted. 
3. Background 
3.1. The Scottish Government established the Scottish Social Services Council (SSSC) in
2001, as the regulator for the social work, social care and children and young people
workforce in Scotland.  The role of the SSSC is to protect the public by registering
this workforce, setting standards for their practice, conduct, training and education
and by supporting their professional development.  Where people fall below the
standards of practice and conduct, SSSC can investigate and take action. 
3.2. SSSC registration is required for social workers, social work students and most roles
in social care and children and young people services across Scotland. 
The Council currently has around 3,583 employees who require SSSC registration
within Social Work Resources, Education Resources and Housing and Technical
Resources.  In line with the requirements, new employees must hold the appropriate
qualification for their post and complete the registration process within 3 months of
their appointment.  Thereafter employees require to re-register every 3 to 5 years
and complete an annual declaration.  Failure to comply with the registration
requirements results in employees being removed from the register. 
3.3.  As part of the 2022 SJC pay award, it was confirmed by CoSLA that SSSC fees
would no longer be paid by employees who required this registration for their jobs,
the fees would instead be covered by Scottish Government.  On this basis there are
no direct cost implications for the Council or its employees in relation to the proposal
to incrementally increase the SSSC registration fees.  However, this change will
have an impact on private sector organisations and their employees who currently
deliver services on behalf of the Council.  The impact of this change could result in a 
10
89

Page 90

barrier to a career in social care or early years (education), either within the Council
or external partners, at a time when authorities are working to enhance routes into
social care as a career and rely on partners to deliver services. 
4.  Consultation on the proposed changes to the fees
4.1. SSSC registration fees were last reviewed and increased in 2017.  As a result of
feedback from this consultation, it was agreed that a longer-term plan for increasing
fees incrementally would be put in place; this consultation was due to start in 2020
but was delayed due to the COVID-19 pandemic.  
4.2. This consultation sought views on proposals to increase SSSC registration fees and
ran for a period of 12 weeks commencing on 30 September 2024 to 23 December
2024.  The SSSC will consider the responses and decide on any increase.  Their
decision will then go to the Minister to consider and if an increase is approved, fees
are likely to increase from 1 April 2025. 
4.3. The proposal stated that SSSC fees will increase by a small amount every year for 5
years, in line with the feedback from the 2016 consultation as shown in the table
below.  The consultation proposed an annual increase in fees ranging from a
maximum of £8 for social workers, managers and care inspectorate inspectors
through to £2 for social work students.  With tax relief, the increase for basic rate
taxpayer registered as a social worker or manager will be £6.40 per year. 
Role Current
fee
2025-26 2026-27 2027-28 2028-29 2029-30
Social
worker/manager 
(£8 annual increase)
£85 £88 £96 £104 £112 £120
Supervisor/practitioner
(£4 annual increase)
£35 £39  £43  £47  £51  £55 
Support worker 
(£3 annual increase)
£25 £28 £31 £34 £37 £40
Social work student
(£2 annual increase)
£15 £17 £19 £21 £23 £25 
5. South Lanarkshire Council Response
5.1. In preparing the response to the consultation, views were sought from across
Personnel Services, Education Resources and Social Work Resources and the
council’s response to each aspect of the consultation, is detailed in Appendix 1 and
covers the key areas detailed below: 
The Council is concerned that any fees increase will have unintended consequences
across a variety of sectors, such as recruiting and retaining entrants into social care
and children’s services roles and the potential negative impact on private
organisations delivering services on behalf of the Council. 
6.  Next Steps
6.1. The consultation was submitted by the closing date.  The SSSC has advised that the
consultation will aim to inform amendments to the fees structure which will be
implemented from 1 April 2025.  An update will be provided to Committee once this
is known. 
7.  Employee implications
7.1. There are no employee implications associated with this report.  
90

Page 91

8. Financial implications
8.1. There are no current financial implications associated with this report.
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no climate change, sustainability or environment implications arising from
this report. 
9.2. This report does not currently introduce a new policy, function or strategy or
recommend a change to an existing policy, function or policy. 
10. Other Implications
10.1. There will be no direct impact to the Council, however, the fees increase is likely to
have an adverse financial impact on the organisations delivering services on behalf
of the Council. 
11. Integrated Impact Assessments and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, and therefore no impact assessment is required. 
11.2. The trade unions will be advised of this consultation at the at the next JTUC
Executive meeting. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 January 2025 
Links to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
 Fair, open and sustainable
 Improve life and prospects for everyone 
 Ensuring inclusion, equity and equality
 Focused on people and their needs 
 Working with and respecting others
 Excellent employer 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Michelle Milne, Head of Personnel Services
Ext:4330 (Tel: 01698 454330)
E-mail: michelle.milne@southlanarkshire.gov.uk 
91

Page 92

Appendix 1
South Lanarkshire Council full response to the SSSC consultation
1. To what extent do you agree that the proposed fee increase is reasonable?
Please select on a scale of 1 to 5 where 1 is 'strongly disagree' and 5 is 'strongly
agree'. 
1 2 3 4 5 
Response: The Council recognises that SSSC registration fees have not
increased since 2017 and that incremental changes are proposed to limit the
impact. It is also recognised that it is appropriate that arrangements are reviewed,
however it is important that any new fee structure does not have unintended
consequences. 
The wider care and education sectors also awaits confirmation of the proposed
change to the fees and fee structure relating to PVG checks. Increasing SSSC
fees within the same time window as this change is due to take effect is therefore
likely to contribute to the pressures within an already stretched sector. These
pressures include significant financial constraints as well as recruitment and
retention issues as detailed below. Specific consideration should be actively
taken to mitigate the impact of these issues. An increase to registration fees
could: 
• Deter entrants into low paid social care and children’s services roles 
• Reduce the number of students in courses leading to qualifications in
regulated professions where SSSC registration membership is required to
undertake work placements as part of the course, resulting in a shortage of
new entrants to these professions 
• Place the costs of safeguarding provisions on workers in lower paid jobs 
• Result in providers of commissioned services, particularly in social care
and early years team, questioning whether their business remains
sustainable and causing them to withdraw from the sector with
consequential procurement and service delivery impacts for councils
and/or health and social care partnerships
• There is the potential that an increase in fees could been seen as a barrier
to a career in social care for  external partners, at a time when authorities
are working to enhance routes into social care as a career
• There is the potential that an increase in fees could been seen as a barrier
to a career in Early Years. 
2. Rather than one large increase we are proposing to raise the registration fees by
increasing each fee by a small amount each year for five years from 1 April
2025/26 to 31 March 2030. For example, taking this approach would mean that
the fee for support workers would go up by £3 per year for five years. 
Do you support increasing the fee by a small amount each year for five years?
Yes  No 
Response: Given the current financial challenges, the Council does not agree
that costs should be increased, however we do acknowledge that the proposed
incremental approach over a 5-year period supports the intention to limit the
92

Page 93

impact on individuals who require to register. It is also acknowledged that the
sliding scale of costs is designed to limit the cost impact on the lowest paid
workers in scope. 
3. Do you have an alternative option you would like us to consider? 
Response: No
4. We are proposing to keep the differences between the fee levels for the different
parts of the Register. We do this to take account of the different salaries between
roles in this sector and so that those on lower salaries pay less. 
To what extent do you agree with this approach? 
Please select on a scale of 1 to 5, where 1 is 'strongly disagree' and 5 is 'strongly
agree' 
1 2 3 4 5 
Response: 
The Council disagrees in principle that costs for SSSC registration should
increase, however if the change goes ahead, we are supportive that the proposed
approach is designed to limit the impact on the lowest paid workers.
5.  What, if any, do you see as the main equality related issues that you feel could  
arise from the proposals set out in this consultation? 
Response: 
The proposals impact on the lower paid, such as young professionals who may
be more likely to be at the start of their career. ,.
If fees have an impact on the numbers working in these service areas, it could
reduce the availability of health, care and education services and have a
disproportionate impact on the most vulnerable members of society such as older
adults, young people and children in addition to those with complex needs or a
disability. 
93

Page 94

94

Page 95

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Early Retirement, Voluntary Severance and Switch 2 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise on activity related to early retirements, voluntary severances, re-
employment of early retirees and re-deployments during the period 1 April 2024
to 30 September 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): 
[recs]
(1) that the early retirements, voluntary severances, re-employment of early
retirees, and redeployment of employees on the Switch 2 register during the
period 1 April 2024 to 30 September 2024 be noted.
[1recs]
3. Background
3.1. The Council analyses the number and associated costs of employees being released
through early retirement and voluntary severance.  This report provides information
on the Council’s position for the 6-month period 1 April 2024 to 30 September 2024. 
4. Current Position 
Early Retirements (Efficiency of the Service/Voluntary Redundancy) and
Voluntary Severance
4.1. During the period, no early retirements on the grounds of efficiency of the service;
voluntary redundancy or voluntary severance were granted.  This represents no
change compared to the previous 6-month period.   
4.2. The re-employment of those who have been granted early retirement is monitored and
approved centrally within Personnel Services.  During the 6-month period, no requests
for re-employment were made and this represents no change when compared to the
previous 6-month period. 
5. Early Retirements – Ill Health
5.1. The Local Government Pension Scheme (LGPS) regulations allow for 2 tiers of ill
health retirement in situations where the member’s ill-health or infirmity of mind or
body renders them permanently incapable of discharging efficiently the duties of their
current employment.  Tier 1 relates to members with no reasonable prospect of
obtaining gainful employment before their state pension age.  Tier 2 relates to
members with a reasonable prospect of obtaining gainful employment before their
state pension age.  
11
95

Page 96

5.2. The Scottish Teachers Pension Scheme (STPS) similarly has 2 levels of ill health
retirement: total incapacity benefits and partial incapacity benefits.  Total incapacity
benefit relates to members who are permanently unable to teach and assessed as
having their ability to carry out any work impaired by more than 90% and this is likely
to be permanent in the future.  Partial incapacity benefit relates to members who are
permanently unable to teach but able to undertake other employment. 
5.3. During the 6-month period, 27 of the 57 ill health retirement requests made, were
granted under the provisions of tier 1 and tier 2 of the Local Government and
Scottish Teachers’ Pension Schemes.  Thirty applications resulted in no award being
granted. 
5.4. In terms of early retirement on the grounds of ill-health, there are no capitalisation
costs to the Council.  During the 6-month period, the following ill-health retirements
were approved: 
Resource  No. of Early Retirements
on ill health grounds
Community and Enterprise 10
Education/ Housing and
Technical 5
Social Work 12
Total 27 
5.5. During the period 1 April 2024 to 30 September 2024, the number of ill health
retirements granted decreased by 19 compared to the same period last year.  This
decrease is due to the reduction of the number of employees with serious medical
conditions who met the criteria for ill health retirement. 
5.6. Annual Trend Analysis 
Annual
Period
1/4/20-
31/3/21
1/4/21-
31/3/22
1/4/22-
31/3/23
1/4/2023-
31/3/24
1/4/2024-
30/9/24
No. of 
ill-health
retirements 
43  46  69  66  27* 
*Denotes 6-month period 
5.7.  Based on the ill health retirements awarded during the 6-month period, it is
anticipated that the annual figure for 1 April 2024 to 31 March 2025 may be lower
when compared with the same period last year. 
6. Switch 2
6.1. Switch 2 is monitored and approved centrally within Personnel Services.  During the
6-month period, 75 employees were redeployed to suitable alternative posts within
the Council as follows:- 
Resource No. of
employees
No. of modern
apprentices
Total
Council Wide 6 0 6
Social Work 67 2 69
TOTALS 73 2 75 
96

Page 97

6.2. This is an increase of 58 when compared to the same period last year and all these
employees have been placed into permanent roles.   
6.3. Annual Trend Analysis 
Annual
Period
1/4/20–
31/03/21
1/4/21–
31/03/22
1/4/22–
31/03/23
1/4/23-
31/3/24
1/4/24-
30/9/24
No. of 
Switch 2
matches
43 90 28 30  75* 
*Denotes 6-month period 
6.4. Based on the number of redeployments during this 6-month period, the annual figure
for 1 April 2024 to 31 March 2025 will increase compared to recent years. The
increase in re-deployments relates primarily to the decommissioning of residential
units within Adults and Older People Services. 
7. Flexible Retirement
7.1. Phased retirement and winding down are options available to teachers in accordance
with the STPS regulations.  Flexible retirement is the option available to local
government employees through the LGPS regulations.  These options allow
employees to access their pensions whilst they continue to work in a reduced capacity. 
In line with the Council’s flexible retirement policy, requests that result in a strain on
the fund cost to the Council will not be granted. 
7.2. Phased retirement, winding down and flexible retirement applications are approved
and monitored centrally within Personnel Services.  During the 6-month period, 71
requests were approved as detailed below with no cost to the Council. 
Resource  No. of Flexible
Retirements
No. of Phased
Retirements/
Winding Down 
Community and
Enterprise 10 
Education 13 19
Finance and Corporate 10 
Housing and Technical 7 
Social Work  12 
Total 71 
7.3. During the 6-month period, the average age of employees granted flexible retirement
was 62 years, and this is unchanged when compared with the same period last year. 
7.4. Flexible retirement refusals are monitored centrally within Personnel Services,
Finance and Corporate Resources and no requests were declined during this period. 
7.5. Annual Trend Analysis 
Annual
Period
1/4/20 -
31/3/21
1/4/21-
31/3/22
1/4/22-
31/3/23
1/4/23-
31/3/24
1/4/24-
30/9/24
No. of 
Flexible
Retirements
125 126 128 156 71*
*Denotes 6-month period  
97

Page 98

7.6. Based on the 71 requests received during the period, it is anticipated that the
number of requests received from 1 April 2024 to 31 March 2025 are likely to
decrease compared to the previous year. 
8. Employee Implications
8.1. In respect of those employees refused ill-health retirement, incapability dismissals
may have been considered. 
9. Financial Implications
9.1. There were no leavers in the period 1 April 2024 to 30 September 2024 for which
early retirement/severance costs were incurred. 
10. Climate Change, Sustainability and Environmental Implications
10.1 There are no climate change, sustainability or environmental implications. 
11.  Other Implications
11.1. The early release of employees across the Council must be properly managed to
minimise the risk of adversely impacting service levels through the loss of vital skills
and experience. In accordance with agreed policies, the redeployment of employees
through the Switch 2 process continues to be considered. 
12. Integrated Impact Assessments and Consultation Arrangements
12.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
12.2. All releases were in line with agreed policies and procedures therefore no further
consultation was required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
25 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Excellent Employer
 Accountable, Effective, Efficient and Transparent 
Previous References
 Finance and Corporate Resources Committee 22 May 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Danielle Lang, HR Business Manager (Operations)
Ext:  4132 (Tel:  01698 454132)
E-mail:  Danielle.Lang@southlanarkshire.gov.uk 
98

Page 99

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 29 January 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Notification of Contracts Awarded:  1 April to 30
September 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee, in accordance with Standing Orders on
Contracts, of contracts awarded by Finance and Corporate Resources during the
period 1 April to 30 September 2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that details of the contracts awarded be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts
that details of the acceptance of all tenders above £50,000 be reported
retrospectively to the relevant Committee for noting, other than those under Clause
21.3 where the award is not the lowest in a price only tender, or costs exceed the
approved financial provision.  In these instances, a report is submitted to the
appropriate Committee and subsequent authority to award is granted by that
Committee. 
4. Contract Awards
4.1. The details of contracts awarded for the period 1 April to 30 September 2024, on the
basis of lowest offer and/or most economically advantageous offer submitted, is
provided at Appendix 1. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. Appropriate budget provision is in place for all contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information presented in this report.  
12
99

Page 100

8. Other Implications
8.1. There are no direct risks or implications for sustainability in terms of the information
contained in this report. 
9. Integrated Impact Assessments and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
4 December 2024 
Link(s) to Council Values/Priorities/Outcomes
 Value:  Accountable, effective, efficient and transparent 
Previous Reference
 Finance and Corporate Resources Committee, 22 May 2024 
List of Background Papers
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.uk 
100

Page 101

Appendix 1
Contracts Awarded by Finance and Corporate Resources over £50,000 in value 
Contract Reference
Number Contract Description Provider name Value Start Date End Date Extension
Date Award Date
SLC/FC/23/025/A
Supply and Delivery of Audio-
Visual Equipment
Learning Space Belfast Ltd, 
Irruptus Ltd T/A EIS, 
Mediascape Ltd, 
SSUK Ltd, 
AVMI Kinly Ltd £345,000 03-Apr-2024 02-Apr-2027  
12-May-
2024
SLC/FC/23/028
Income Management System /
Online Cashless Payments Civica UK Ltd £1,284,664 14-Sep-2024 13-Sep-2029 13-Sep-2031 13-Sep-2024
SLC/FC/23/033
Provision of a Shared Digital ARC
Technology Solution Chubb Fire & Security Ltd £492,449 17-May-2024 16-May-2028 16-May-2029
19-May-
2024
SLC/FC/23/053
Supply and Delivery of Specialist
Digital Paper Elliott Baxter & Company Ltd £280,000 10-Jun-2024 09-Jun-2027 09-Jun-2028 05-Jun-2024
SLC/FC/23/063
Council Tax Discount and
Exemption Review Datatank Ltd £247,825 01-Apr-2024 31-Mar-2027 31-Mar-2029 17-Apr-2024
SLC/FC/23/094
Provision of Water and Waste
Services
Scottish Water Business Stream
Ltd £14,000,000 01-Apr-2024 31-Mar-2027 31-Mar-2028 16-Apr-2024
SLC/FC/23/095
Software Solution for Grounds,
Street Cleansing & Waste
Services
Computacenter (UK) Ltd
£370,147 01-Oct-2024 30-Sep-2028 30-Sep-2029 29-Aug-2024
SLC/FC/23/103 Online Benefits Calculator Computacenter (UK) Ltd £66,477 01-Aug-2024 31-Jul-2026 31-Jul-2027 06-Sep-2024
SLC/FC/23/104
Provision of a Sundry Debtors
System Civica UK Ltd £172,871 04-Aug-2024 03-Aug-2029 03-Aug-2034 24-Aug-2024
SLC/FC/23/111
Safety Management System
including Auditing and Inspection
Software
Computacenter (UK) Ltd
£141,654 19-Aug-2024 30-Sep-2029   14-Aug-2024
SLC/FC/23/114
Blue Badge Central Record and
Badge Ordering Services Valtech Ltd £64,916 05-Aug-2024 04-Aug-2027 04-Aug-2029 16-Aug-2024
SLC/FC/23/118
Microsoft Enterprise Licensing
Agreement Insight Direct (UK) Ltd £5,000,000 01-Jul-2024 30-Jun-2027  
31-May-
2024
SLC/FC/23/126
Oracle - OCI IAM - Universal
Credit Expansion Oracle Corporation UK Ltd £115,912 09-Apr-2024 17-May-2027   13-Apr-2024
SLC/FC/23/128 Desktop Client Devices HP Inc UK Limited £700,000 01-Sep-2023 31-Aug-2027  
03-May-
2024
101

Page 102

SLC/FC/23/129 Mobile Client Devices HP Inc UK Limited £2,400,000 16-Aug-2021 15-Aug-2025  
03-May-
2024
SLC/FC/24/025
Advice Pro Case Management
Software - Money Matters
Advanced Case Management
Solutions £112,258 01-Oct-2023 30-Sep-2026 30-Sep-2027 24-Sep-2024
SLC/FC/24/027 Printing and Associated Services Multiple Suppliers £241,666 15-May-2024 31-Jul-2027 31-Jul-2028
15-May-
2024
SLC/FC/24/035 Oracle Fusion Implementation Oracle Corporation UK Ltd £73,658 25-Apr-2024 24-Oct-2024  
03-May-
2024
SLC/FC/24/037
Technology Peripherals and
Infrastructure Computacenter (UK) Ltd £558,000 10-Jun-2024 09-Jun-2026 09-Jun-2027
22-May-
2024
SLC/FC/24/042
Provision of Microsoft Support
Services Softcat Plc £121,974 01-Jul-2024 30-Jun-2027   28-Jun-2024
SLC/FC/24/050
Support Services for Oracle
Fusion Mastek Systems Company Ltd £600,000 09-Jul-2024 08-Jul-2026 08-Jul-2027 28-Jun-2024
SLC/FC/24/061
Recruitment Advertising and
Public Information Notices Penna Plc £102,358 23-Sep-2024 22-Sep-2028 22-Sep-2029 16-Sep-2024
SLC/FC/24/064 Web Security Gateway Licences Computacenter (UK) Ltd £78,982 02-Oct-2024 01-Oct-2025   23-Sep-2024
SLC/PS/FINCOR/22/012
Provision of Access, Hand,
Mobile and Small Plant Operators
Training
Framework Suppliers
£480,000 17-Jun-2024 16-Jun-2028   25-Jun-2024
SLC/PS/FINCOR/22/158 SLC Website Hosting Jadu Creative Ltd £311,248 01-Apr-2024 31-Mar-2026 31-Mar-2027 28-Jun-2024  
102

Page 103

Contract Extensions for contracts over £50,000 in value
Contract Reference
Number Contract Description Provider name Contract
Value Ext value Start Date End Date Extension
Date
SLC/FC/23/064
Oracle Fusion Project
Management Resource
Pilcher Consulting Services
Ltd £147,500 £60,000 06-Jun-2024 30-Nov-2024 29-May-2024
SLC/PS/FINCOR/20/003
Electronic Payment
Services Allpay.Net Ltd £525,157 £125,697 01-Sep-2024 31-Aug-2025 30-Aug-2024
SLC/PS/FINCOR/20/171 Technical Managed Service Idox Software Ltd £175,000 £81,984 01-Jun-2024 31-May-2026 23-May-2024
SLC/PS/FINCOR/21/029
Support for NDL Integration
Tool NDL Software Ltd £118,000 £62,000 03-Aug-2024 02-Aug-2026 16-Aug-2024
SLC/PS/FINCOR/21/089
Oracle Fusion SI partner –
Hypercare: extension of
timescale only
Mastek Systems Company
Ltd £5,324,005 Nil 28-Sep-2024 27-Dec-2024 26-Sep-2024
SLC/PS/FINCOR/23/012
Provision of Employee
Physiotherapy Services Physicare £420,000 £210,000 08-Jun-2024 07-Jun-2025 01-Jun-2024 
103

Page 104

104