Agenda Document Pack - Finance and Corporate Resources Committee - 30/10/2024

South Lanarkshire Council · 30 October 2024
Back to Finance and Corporate Resources Committee — 30 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 22 October 2024 
Dear Councillor 
Finance and Corporate Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 30 October 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Lesley McDonald (Chair), Walter Brogan (Depute Chair), Celine Handibode (Depute Chair), Joe
Fagan (ex officio), Alex Allison, Mathew Buchanan, Andy Carmichael, Maureen Chalmers, Margaret
Cooper, Andrea Cowan, Maureen Devlin, Mary Donnelly, Grant Ferguson, Gladys Ferguson-Miller,
Graeme Horne, Martin Hose, Katy Loudon, Hugh Macdonald, Catherine McClymont, Elaine
McDougall, Mark McGeever, Richard Nelson, Mo Razzaq, John Ross, Graham Scott, Kirsty
Williams 
Substitutes
John Bradley, Archie Buchanan, Colin Dewar, Ross Gowland, Gavin Keatt, Susan Kerr, Ross
Lambie, Martin Lennon, Richard Lockhart, Carol Nugent, Norman Rae, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Finance and Corporate Resources held on 21
August 2024 submitted for approval as a correct record.  (Copy attached) 
5 - 14 
Monitoring Item(s) 
3 Revenue Budget Monitoring 2024/2025 - Finance and Corporate Resources
Report dated 2 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
15 - 26 
4 Capital Budget Monitoring 2024/2025 - Finance and Corporate Resources
Report dated 2 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
27 - 30 
5 Finance and Corporate Resources – Workforce Monitoring – July to
September 2024
Report dated 10 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
31 - 38 
6 Council-wide Workforce Monitoring – July to September 2024
Report dated 10 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
39 - 60 
7 Treasury Management Activity – 2024/2025 Second Quarter Review
Report dated 3 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
61 - 68 
Item(s) for Decision 
8 Prudential Indicators Treasury Management Activity and Annual
Investment Report 2023/2024
Report dated 8 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
69 - 88 
9 Scottish Public Pensions Agency Consultation on the Scottish Teachers
Pension Scheme
Report dated 10 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
89 - 98 
10  Revenue Collection and Approval for Write Offs
Report dated 30 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
99 - 104 
Item(s) for Noting 
11  Reserves Strategy
Report dated 2 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
105 - 112
2

Page 3

12  Annual Procurement Report – 2023/2024
Report dated 9 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
113 - 170 
13  Update of the Finance and Corporate Resources Risk Register and Risk
Control Plan
Report dated 8 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
171 - 188 
Urgent Business 
14  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

FINANCE AND CORPORATE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 21 August 2024 
Chair:
Councillor Lesley McDonald 
Councillors Present:
Councillor Alex Allison, Councillor Walter Brogan (Depute), Councillor Mathew Buchanan, Councillor
Andy Carmichael, Councillor Maureen Chalmers, Councillor Margaret Cooper, Councillor Andrea
Cowan, Councillor Maureen Devlin, Councillor Mary Donnelly, Councillor Grant Ferguson, Councillor
Gladys Ferguson-Miller, Councillor Ross Gowland (substitute for Councillor Mo Razzaq), Councillor
Celine Handibode (Depute), Councillor Graeme Horne, Councillor Martin Hose, Councillor Katy
Loudon, Councillor Hugh Macdonald, Councillor Catherine McClymont, Councillor Elaine McDougall,
Councillor Richard Nelson, Councillor John Ross, Councillor Graham Scott, Councillor Kirsty Williams 
Councillors' Apologies:
Councillor Joe Fagan (ex officio), Councillor Mark McGeever, Councillor Mo Razzaq 
Finance and Corporate Resources
J Taylor, Executive Director; C Fergusson, Head of Finance (Transactions); M Husband, Head of IT
Services; S Jessup, Administration Assistant; T Little, Head of Communications and Strategy; C Lyon,
Administration Officer; E Maxwell, HR Business Manager; L O’Hagan, Head of Finance (Strategy); I
Strachan, Head of Administration and Legal Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Finance and Corporate Resources Committee held on 22 May
2024 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Minutes of the Appeals Panel
The minutes of the meeting of the Appeals Panel held on 30 May 2024 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
4 Minutes of Recruitment Committee 
The minutes of the meetings of the Recruitment Committee held on 4 and 21 June 2024 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.  
2
5

Page 6

5 Revenue Budget Monitoring 2023/2024 – Finance and Corporate Resources 
A report dated 9 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted comparing the actual expenditure for the period 1 April 2023 to 31 March 2024 against
budgeted expenditure for 2023/2024 for Finance and Corporate Resources. 
As at 31 March 2024, there was an overspend of £0.165 million, as detailed in Appendix A to the
report.  This was a favourable movement of £0.051 million from the probable outturn position
reported in May which was an overspend of £0.216 million. 
Virements were proposed to realign budgets and those movements were detailed in the
appendices to the report 
The Committee decided: 
(1) that the final outturn position as at 31 March 2024 of an overspend of £0.165 million, as
detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference:  Minutes of 22 May 2024 (Paragraph 5)] 
6 Revenue Budget Monitoring 2024/2025 - Finance and Corporate Resources 
A report dated 29 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted comparing the actual expenditure for the period 1 April to 14 June 2024 and providing
a forecast for the year to 31 March 2025 for Finance and Corporate Resources. 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided at Appendix B to the report. 
As at 14 June 2024, the projected outturn position for the Resource was a breakeven position. 
Virements were proposed to realign budgets and those movements were detailed in the
appendices to the report. 
Officers responded to a member’s question on the report. 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position, as detailed in Appendix B of the
report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
7 Capital Budget Monitoring 2023/2024 - Finance and Corporate Resources
A report dated 31 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted advising of progress on Finance and Corporate Resources’ capital programme for
2023/2024 and summarising the expenditure at 31 March 2024.  
6

Page 7

The budget for 2023/2024 was £5.333 million.  Total expenditure to 31 March 2024 was £4.649
million. 
The final outturn position of £4.649 million was an underspend of £0.684 million in comparison to
the programme of £5.333 million.  The underspend reflected the level of capital spend achieved
on IT Infrastructure and was mainly due to in-house staff costs for the Oracle Fusion Project being
managed through the Finance and Corporate Resources’ revenue budget rather than through
capital programme.  Funding for those projects would continue into the next financial year,
including the approved budget to facilitate the completion of the Oracle Fusion project. 
The Committee decided: that the Finance and Corporate Resources’ capital
programme of £5.333 million, and expenditure for the year
of £4.649 million, be noted. 
[Reference:  Minutes of 22 May 2024 (Paragraph 6) and Minutes of the Executive Committee of
26 June 2024 (Paragraph 5)] 
8 Capital Budget Monitoring 2024/2025 - Finance and Corporate Resources 
A report dated 31 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted advising of progress on Finance and Corporate Resources’ capital programme for
2024/2025 and summarising the expenditure position at 14 June 2024. 
The revised capital programme for 2024/2025 was £3.086 million, as approved by the Executive
Committee on 7 August 2024. 
The forecast for the financial year was £3.086 million and spend to date was £0.815 million. 
The Committee decided: that the Finance and Corporate Resources’ capital
programme of £3.086 million, and expenditure to date of
£0.815 million, be noted. 
[Reference:  Minutes of South Lanarkshire Council of 21 February 2024 (Paragraph 4) and
Minutes of the Executive Committee of 7 August 2024 (Paragraph 4)] 
9 Finance and Corporate Resources - Workforce Monitoring – April to June 2024
A report dated 24 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the following employee information for Finance and Corporate Resources for the
period April to June 2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 11 June 2024 
The Committee decided: that the report be noted 
[Reference:  Minutes of 22 May 2024 (Paragraph 7)]  
7

Page 8

10 Council-wide Workforce Monitoring – April to June 2024 
A report dated 11 April 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the following Council-wide employee information for the period April to June 2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 11 June 2024 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 22 May 2024 (Paragraph 8)] 
Councillor Horne joined the meeting during consideration of the above item of business 
11 Treasury Management Activity - 2024/2025 First Quarter Review 
A report dated 1 August 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the first quarter review of Treasury Management activity for 2024/2025. 
Details were given on:- 
 market performance  management of risk
 debt management and borrowing strategy  next quarter investment plans
 investment activity  treasury management indicators 
The Committee decided: that the report be noted. 
[Reference:  Minutes of South Lanarkshire Council of 21 February 2024 (Paragraph 5)] 
12 Finance and Corporate Resource Plan – Quarter 4 Progress Report 2023/2024 
A report dated 8 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Finance and Corporate Resource Plan Quarter 4 Progress Report for 2023/2024
for the period 1 April 2023 to 31 March 2024. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG) which indicated that an action had been completed. 
Details were provided on:- 
 progress made in implementing the priority projects identified in the Resource Plan
2023/2024, as detailed in the Quarter 4 Progress Report, attached as Appendix 2 to the
report
 key achievements made by the Resource to date, as detailed in Section 5.3 of the report
 measures which had changed from Quarter 2 to Quarter 4, as detailed in Appendix 3 to the
report 
Officers responded to a member’s question on the report. 
8

Page 9

The Committee decided: 
(1) that the Finance and Corporate Resource Plan Quarter 4 Progress Report 2023/2024, as
summarised in paragraph 5.2. and attached as Appendix 2 of the report, be noted; 
(2) that the key achievements made by the Resource for the year, as detailed in paragraph 5.3.
of the report, be noted; 
(3) that it be noted that there were no areas for improvement, as detailed in paragraph 5.4. of
the report; and 
(4) that the additional scrutiny of changes in measure status between Quarter 2 and Quarter 4,
as summarised at paragraph 5.5. and detailed at Appendix 3 of the report, be noted. 
[Reference:  Minutes of 27 September 2023 (Paragraph 13)] 
Councillor McClymont left the meeting during consideration of the above item of business 
13 Revenue Collection and Approval for Write-Offs 
A report dated 1 August 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 collection performance for the financial year 2024/2025 to 30 June 2024 on revenue income
which comprised Council Tax, non-domestic rates, sundry debts and arrears
 performance in the Business Rates Incentivisation Scheme (BRIS)
 the write-off of irrecoverable Council Tax, non-domestic rates, Business Improvement
District (BID) levy, sundry debt and Housing Rent and associated charges 
Details were provided on current collection targets.  The Council was ahead of both target and
comparable performance from 2023/2024 in respect of Council Tax.  In respect of Sundry Debt,
the Council was equal to target from 2023/2024.  In respect of non-domestic rates, the Council
was ahead of target and behind to comparable performance from 2023/2024. 
In terms of arrears collection targets, the Council was ahead of both target and comparable
performance from 2023/2024 in respect of Council Tax.  In relation to sundry debt, the Council
was behind target and also comparable performance for 2023/2024.  In respect of non-domestic
rates, the Council was ahead of target but behind comparable performance for 2023/2024. 
The Non Domestic Rates Incentivisation Scheme (NDRIS), formerly known as the Business Rates
Incentivisation Scheme (BRIS), was a Scottish Government initiative to incentivise growth of the
local business tax base, with a view to increasing NDR income yields. 
The Scottish Government set annual targets for growth (buoyancy) and Councils which achieved
their target retained 50% of the additional income generated above the target.  The provisional
annual buoyancy target for South Lanarkshire Council in 2024/2025 had been set by the Scottish
Government at 0.9%. 
Performance against the NDRIS target would be reported to Committee on a quarterly basis. 
Buoyancy for the first quarter, to the end of June 2024, was 0.42%.  The tax base required to
achieve growth of more than 0.48% during the remaining 3 quarters of the financial year to secure
additional income under the scheme.  
9

Page 10

It was proposed that the following debts be written off:- 
 irrecoverable Council Tax accounts from 1993/1994 to 2024/2025 to the value of
£1,756,955.85 relating primarily to prescribed debt, sequestrations and estates of the
deceased
 irrecoverable non-domestic rates from 2022/2023 to 2024/2025 to the value of £217,621.86
relating primarily to debtors in liquidation, those who had ceased trading or had been
sequestrated
 BID levies totalling £979.56 administered by the Council on behalf of Hamilton, Carluke and
Lanark BID companies
 sundry debts to a value of £168,847.89
 former tenant rent arrears totalling £1,455,866.27 (including bulk write-off for 2020/2021 and
2021/2022 for temporary accommodation), factoring arrears of £681.89 and housing benefit
overpayments of £9,620.25 
The Committee decided: 
(1) that the Council’s performance in the collection of revenues be noted; 
(2) that the current position in respect of the Business Rates Incentivisation Scheme be noted;
and 
(3) that the write-off of the following irrecoverable debts be approved:-
 Council Tax debt from 1993/1994 to 2023/2024 to the value of £1,756,955.85
 Non Domestic Rates from 2022/2023 to 2023/2024 totalling £217,621.86
 BID levies totalling £979.56
 sundry debts to a value of £168,847.89
 house rent and associated charges totalling £1,466,168.41 
[Reference: Minutes of 22 May 2024 (Paragraph 9)] 
Councillor Nelson left the meeting during consideration of the above item of business 
14 Money Matters Advice Service – Annual Report 2023/2024 
A report dated 29 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Money Matters Advice Service Annual Report for 2023/2024. 
The Money Matters Advice Service (MMAS) was currently being assessed for accreditation under
the Scottish National Standards for Advice and Information Providers (SNAIP), by the Scottish
Legal Aid Board (SLAB). 
The SNAIP was a quality assurance scheme run by the Scottish Government and administered
by the SLAB for advice agencies that provided money, housing, and welfare rights advice.  There
were 2 key elements of the assessment process:- 
 review of casework to determine if the quality of advice was of an appropriate standard
 review of policies and practices to ensure the service was being appropriately managed. 
Accreditation provided assurance to clients and other stakeholders on the quality of the service
and advice provided.  
10

Page 11

Standard 2.5 of SNAIP required all services to regularly review their work against the aims and
objectives for their service and make the results of those reviews available in a publicly accessible
format at least once a year.  An annual report was considered the most appropriate format to do
this. 
The Annual Report consisted of 11 chapters and provided an overview of the role that MMAS
performed for the Council and the residents of South Lanarkshire.  It also provided a summary of
key statistics showing the demand on MMAS in the financial year 2023/2024 and the performance
of the service by functional team, along with key statistics from the client satisfaction surveys that
were carried out monthly. 
The Annual Report also included key demographic information about the clients that used the
service and also provided an analysis of who accessed the service using data zones from the
Scottish Index of Multiple Deprivation and by Electoral Ward.  It also contained several case
studies that illustrated the work of the various teams with the Service. 
The key highlights of the Annual Report were detailed in Section 5 of the report, with the Annual
Report 2023/2024 attached at Appendix 1 to the report. 
Officers responded to a member’s question on the report. 
The Committee decided: 
[ (1) that the Money Matters Advice Service Annual Report be noted; and 
(2) that the Annual Report 2023/2024 be published on the Council’s website. 
15 Common Good Update Report
A report dated 24 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 the Common Good Accounts for the year ended 31 March 2024
 the cyclical spend committed against the Common Good repairs and maintenance budgets
for Lanark and Hamilton
 requests for funding from Lanark Common Good that could not be met from the repairs and
maintenance budgets
 the outcome of a review of the titles to Biggar Public Park and Golf Course undertaken in
respect of Common Good land 
The Common Good funds held within South Lanarkshire Council were Lanark, Biggar, Hamilton
and Rutherglen.  Accounts were prepared on an annual basis, as part of the Council’s year end
process.  The position for the year was detailed in Section 4 of the report and the unaudited
accounts attached at Appendix 1 to the report. 
The Common Good accounts in Lanark and Hamilton held a number of properties.  On 2 October
2013, this Committee had approved an annual cyclical maintenance plan of £15,000 for both
Lanark and Hamilton Common good properties.  If inspections highlighted requirements to
undertake investment which would be beyond routine maintenance, this would be considered
separately for approval and would be the subject of a report to this Committee. 
Cyclical spend committed against the Common Good repairs and maintenance budgets for Lanark
and Hamilton was detailed in Sections 5 and 6 of the report.  
11

Page 12

A number of requests for funding had been received for Lanark Common Good that were either
not for repairs and maintenance or which could not be approved under delegated authority due to
the expected costs, and those were detailed in Section 7 to the report. 
A report had been presented to the Community and Enterprise Resources Committee on 18 June
2024 providing an update on work undertaken to secure arrangements for the long-term financial
stability of Biggar Park and Golf Course.  The report noted that a review of the titles was being
undertaken in respect of Common Good land. 
The review had now concluded that the majority of the title to Biggar Public Park and Golf Course
should now be treated as “inalienable” Common Good.  As detailed in Section 8 of the report, this
meant that law relating to Common Good would apply to this area, including that if the Council
was considering any proposed changes of use or disposals, it would need to undertake a
community consultation as required under the relevant legislation. 
The Committee decided:
cs]
(1) that the accounts for Common Good for the year ended 31 March 2024 be noted; 
(2) that the cyclical spend committed against the Common Good repairs and maintenance
budgets for Lanark and Hamilton be noted; 
(3) that projects that would require funding from Lanark Common Good that could not be met
from the repairs and maintenance budgets be approved; and 
(4) that the outcome of a review of the titles to Biggar Public Park and Golf Course undertaken
in respect of Common Good land be noted. 
[Reference: Minutes of 22 May 2024 (Paragraph 12) and Minutes of the Community and
Enterprise Resources Committee of 18 June 2024 (Paragraph 14)] 
In terms of Standing Order No 14, the Chair adjourned the meeting after this item of business at
3.00pm and reconvened at 3.05pm.  Councillor Ross was not present when the meeting reconvened 
16 Framework for the Use and Management of Common Good Assets
A report dated 24 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on a proposed framework for the use and management of Common Good Assets. 
The Common Good was a fund of money/assets and was administered by a Scottish local
authority in respect of each former burgh within the area of the local authority. 
Common good property was administered separately from other local authority assets for
accounting purposes.  What the authority could do with assets was subject to a system of statutory
control.  This control had the potential to limit the extent to which the authority could dispose of or
deal with the asset and on what terms. 
The Common Good funds held within South Lanarkshire Council were Lanark, Biggar, Hamilton
and Rutherglen. 
The Inner House of the Court of Session ruled in a case against Angus Council, that assets which
had been built by the General Fund of a local authority were part of the applicable Common Good
Fund and had been since being built.  
12

Page 13

In recognition of that decision, it was considered appropriate that a framework was established
that provided clarity on the management arrangements between the General Fund and the
Common Good Funds of the Council, particularly with respect to buildings. 
In establishing a framework, there were some key principles that should be considered, as detailed
in Section 4 of the report. 
3 scenarios of interaction between the General Fund and Common Good Funds in relation to the
use of assets and buildings, in particular, were detailed in Section 5 of the report. 
A list of current Common Good Assets was detailed in Appendix 1 to the report. 
The proposed framework should not result in any significant change in the financial position of
either the Common Good Fund or the General Fund. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: that the framework for the use and management of assets,
as detailed in the 3 Scenarios presented in Section 5 of the
report, be approved. 
[Reference:  Minutes of 22 May 2024 (Paragraph 12)] 
Councillor Cooper, having experienced IT issues, joined the meeting during consideration of the
above item of business 
17 Urgent Business 
There were no items of urgent business. 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2024/2025 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[p
 advise Committee of the forecast for the year to 31 March 2025 for Finance and
Corporate Resources, and the actual spend position for the period 1 April 2024 to
9 August 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected breakeven position on the 2024/2025 revenue budget for
Finance and Corporate Resources, as detailed in Appendix B of the report, be
noted; and
(2) that the proposed budget virements be approved. 
3. Background
3.1. This is the second revenue budget monitoring report presented to the Finance and
Corporate Resources Committee for the financial year 2024/2025. 
3.2. The report details the financial position for Finance and Corporate Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendix B provides the detailed financial position with
variance explanations by budget category.  Any variance explanations and proposed
budget virements are shown, where relevant, in Appendices C to I. 
3.3. This report reflects the actual spend to 9 August 2024 within the Resource budget
and the expected outturn forecast on expenditure and income at this date. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Appendix A is the service analysis statement and will outline the key projected
outturn variances by Service for the Resource. 
5.2. As at 9 August 2024, the Resource’s projected outturn position for 2024/2025 is
breakeven (Appendix B).  
3
15

Page 16

5.3. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in Appendices C-I, where
relevant. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed.  In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
2 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 9 August 2024. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel: 01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
16

Page 17

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Strategy 1,851 1,767 84 4.54% 2,397
Transactions 16,775 16,804 (29) (0.17%) 5,041
Audit 318 303 15 4.72% 189
Information Technology 6,852 6,852 0 0.00% 7,278
Communications and Strategy 2,560 2,584 (24) (0.94%) 1,381
Administration, Legal, Licensing and
Registration 4,048 4,039 9 0.22% 1,958
Personnel 6,328 6,383 (55) (0.87%) 2,387
Net Controllable Exp. 38,732 38,732 0 0.00% 20,631 
Service Heading Explanation for significant projected outturn variances
Strategy There is an anticipated underspend in Employee Costs due to the level of turnover during
the financial year.  This is partially offset by an anticipated overspend in Payments to Other
Bodies reflecting the uplift in the External Audit fee. (See Appendix C). 
Transactions  There is an anticipated overspend in Administration Costs due to higher than budgeted
postage costs for Council Tax billing. (See Appendix D).
Audit  No significant year end outturn variances to report. (See Appendix E).
Information Technology There is an anticipated underspend in Employee Costs due to the level of turnover during
the financial year.  This is offset by an anticipated overspend in Supplies and Services due
to greater than budgeted IT costs. (See Appendix F). 
Communications and
Strategy 
There is an anticipated overspend in Employee Costs due to a lower than budgeted level of
turnover during the financial year. (See Appendix G).
Administration, Legal,
Licensing and Registration
There is an anticipated underspend in Payments to Other Bodies reflecting the demand for
Administration Grants.  This is offset by an anticipated overspend in Employee Costs due to
a lower than budgeted level of turnover during the financial year. (See Appendix H). 
Personnel There is an anticipated overspend in Payments to Other Bodies relating to medical costs
due to demand. (See Appendix I). 
17

Page 18

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Finance & Corporate Resources Summary 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 32,156 32,102 54 under 0.17% 10,854                 
Property Costs 3,866 3,866 0 - 0.00% 506                 
Supplies & Services 7,452 7,494 (42) over (0.56%) 4,726                 
Transport & Plant 33 33 0 - 0.00% 2                 
Administration Costs 8,662 8,691 (29) over (0.33%) 2,902                 
Payments to Other Bodies 4,022 4,007 15 under 0.37% 2,206                 
Payments to Contractors 277 277 0 - 0.00% 81                 
Transfer Payments 65,288 65,288 0 - 0.00% 17,971                 
Financing Charges 1,214 1,224 (10) over (0.82%) 906                 
Total Controllable Exp. 122,970 122,982 (12) over (0.01%) 40,154                
Total Controllable Inc. (84,238) (84,250) 12 over
recovered (0.01%) (19,523)                 
Net Controllable Exp. 38,732 38,732 0 - 0.00% 20,631                
Variance Explanations            
Variance explanations are shown in Appendices C to I as appropriate.                      
Budget Virements            
Budget Virements are noted in Appendices C to I as appropriate.        
18

Page 19

Appendix C 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Finance – Strategy Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000  £000  £000   £000 
Employee Costs 2,729 2,593 136 under 4.98% 1,151 1            
Property Costs 0 0 0 - 0.00% 0 
Supplies & Services 9 9 0 - 0.00% 6 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 114 114 0 - 0.00% 2 
Payments to Other Bodies 600 672 (72) over (12.00%) 146 2            
Payments to Contractors 22 22 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 20 20 0 - 0.00% 2 
Total Controllable Exp. 3,494 3,430 64 under 1.83% 1,307 
Total Controllable Inc. (1,643) (1,663) 20 over
recovered (1.22%) 1,090 3            
Net Controllable Exp. 1,851 1,767 84 under 4.54% 2,397 
Variance Explanations  
1. The underspend in Employee Costs is due to the anticipated level of turnover during the year.
2. The overspend on Payments to Other Bodies is due to the expected uplift in the External Audit Fee.
3. The over-recovery of income reflects a higher than budgeted recharge to Funds reflecting the level of employee costs and 
overheads incurred.      
Budget Virements  
None. 
19

Page 20

Appendix D 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Finance – Transactions Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 11,993 11,975 18 under 0.15% 3,884 
Property Costs 3,860 3,860 0 - 0.00% 500 
Supplies & Services 478 487 (9) over (1.88%) 382 a            
Transport & Plant 4 4 0 - 0.00% 0 
Administration Costs 2,291 2,319 (28) over (1.22%) 480 1            
Payments to Other Bodies 1,500 1,500 0 - 0.00% 808 
Payments to Contractors 255 255 0 - 0.00% 77 
Transfer Payments 65,288 65,288 0 - 0.00% 17,971 
Financing Charges 106 116 (10) over (9.43%) 4 
Total Controllable Exp. 85,775 85,804 (29) over (0.03%) 24,106     
Total Controllable Inc. (69,000) (69,000) 0 - 0.00% (19,065)     
Net Controllable Exp. 16,775 16,804 (29) over (0.17%) 5,041 
Variance Explanations  
1. The anticipated overspend in Administration Costs is due to higher than budgeted postage costs for Council Tax billing.    
Budget Virements  
a. Centralisation of IT Budgets. Net effect (£0.147m): Supplies and Services (£0.147m). 
20

Page 21

Appendix E 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Audit Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 469 458 11 under 2.35% 191     
Property Costs 0 0 0 - 0.00% 0     
Supplies & Services 7 2 5 under 71.43% 0     
Transport & Plant 0 0 0 - 0.00% 0     
Administration Costs 6 7 (1) over (16.67%) 0     
Payments to Other Bodies 0 0 0 - 0.00% 0     
Payments to Contractors 0 0 0 - 0.00% 0     
Transfer Payments 0 0 0 - 0.00% 0     
Financing Charges 4 4 0 - 0.00% 0     
Total Controllable Exp. 486 471 15 under 3.09% 191     
Total Controllable Inc. (168) (168) 0 - 0.00% (2)     
Net Controllable Exp. 318 303 15 under 4.72% 189 
Variance Explanations  
None.      
Budget Virements  
None. 
21

Page 22

Appendix F 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Information Technology Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000 
Employee Costs 5,023 4,993 30 under 0.60% 1,684 1            
Property Costs 0 0 0 - 0.00% 0     
Supplies & Services 6,052 6,082 (30) over (0.50%) 4,085 2, a            
Transport & Plant 4 4 0 - 0.00% 0     
Administration Costs 1,593 1,593 0 - 0.00% 777 a            
Payments to Other Bodies 0 0 0 - 0.00% 0     
Payments to Contractors 0 0 0 - 0.00% 0     
Transfer Payments 0 0 0 - 0.00% 0     
Financing Charges 631 631 0 - 0.00% 732     
Total Controllable Exp. 13,303 13,303 0 - 0.00% 7,278     
Total Controllable Inc. (6,451) (6,451) 0 - 0.00% 0 a            
Net Controllable Exp. 6,852 6,852 0 - 0.00% 7,278 
Variance Explanations  
1. The underspend in Employee Costs is due to the anticipated level of turnover during the year.
2. The anticipated overspend in Supplies and Services is due to greater than budgeted IT subscription costs.   
Budget Virements  
a. Centralisation of IT Budgets. Net effect £0.949m: Supplies and Services (£0.344m); Administration Costs (£0.013m);    
Income £1.306m. 
22

Page 23

Appendix G 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Communications and Strategy Services 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note               
Employee Costs 2,131 2,157 (26) over (1.22%) 765 1            
Property Costs 0 0 0 - 0.00% 1     
Supplies & Services 659 659 0 - 0.00% 153     
Transport & Plant 3 3 0 - 0.00% 1     
Administration Costs 1,102 1,102 0 - 0.00% 342     
Payments to Other Bodies 959 959 0 - 0.00% 756 a            
Payments to Contractors 0 0 0 - 0.00% 4     
Transfer Payments 0 0 0 - 0.00% 0     
Financing Charges 351 351 0 - 0.00% 160     
Total Controllable Exp. 5,205 5,231 (26) over (0.50%) 2,182     
Total Controllable Inc. (2,645) (2,647) 2 over
recovered (0.08%) (801)     
Net Controllable Exp. 2,560 2,584 (24) over (0.94%) 1,381 
Variance Explanations  
1. The underspend in Employee Costs is due to the anticipated level of turnover during the year.      
Budget Virements  
a. Transfer from Reserves to fund spend on Community Wishlist and Can-Do activities. Net effect £0.188m: Payments to Other    
Bodies £0.188m. 
23

Page 24

Appendix H 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Administration, Legal, Licensing and Registration 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000    £000 
Employee Costs 3,321 3,436 (115) over (3.46%) 1,201 1            
Property Costs 6 6 0 - 0.00% 3     
Supplies & Services 143 151 (8) over (5.59%) 79     
Transport & Plant 13 13 0 - 0.00% 1     
Administration Costs 2,351 2,351 0 - 0.00% 953     
Payments to Other Bodies 679 547 132 under 19.44% 285 2            
Payments to Contractors 0 0 0 - 0.00% 0     
Transfer Payments 0 0 0 - 0.00% 0     
Financing Charges 65 65 0 - 0.00% 6     
Total Controllable Exp. 6,578 6,569 9 under 0.14% 2,528     
Total Controllable Inc. (2,530) (2,530) 0 - 0.00% (570)     
Net Controllable Exp. 4,048 4,039 9 under 0.22% 1,958   
Variance Explanations  
1. The overspend in Employee Costs is due to lower than anticipated turnover during the year
2. The underspend in Payments to Other Bodies reflects the anticipated demand for Administration Grants and will be considered 
as part of the overall review of grants moving forward.   
Budget Virements  
None. 
24

Page 25

Appendix I 
South Lanarkshire Council 
Revenue Budget Monitoring Report 
Finance & Corporate Resources Committee: Period Ended 9 August 2024 (No. 5) 
Personnel 
Budget Category
Revised
Annual
Budget 
Projected
Outturn
Projected
Outturn
Variance 
Over/
Under
%
Variance
YTD
Actual  Note 
£000 £000 £000   £000      
Employee Costs 6,490 6,490 0 - 0.00% 1,978 
Property Costs 0 0 0 - 0.00% 2 
Supplies & Services 104 104 0 - 0.00% 21 
Transport & Plant 9 9 0 - 0.00% 0 
Administration Costs 1,205 1,205 0 - 0.00% 348 
Payments to Other Bodies 284 329 (45) over (15.85%) 211 1            
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 37 37 0 - 0.00% 2 
Total Controllable Exp. 8,129 8,174 (45) over (0.55%) 2,562 
Total Controllable Inc. (1,801) (1,791) (10) under
recovered 0.56% (175) 
Net Controllable Exp. 6,328 6,383 (55) over (0.87%) 2,387 
Variance Explanations  
1. The overspend in Payments to Other Bodies relates to greater than budgeted medical costs reflecting demand. 
Budget Virements  
None. 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2024/2025 - Finance and
Corporate Resources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Finance and
Corporate Resources for the period 1 April 2024 to 9 August 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Finance and Corporate Resources capital programme of
£3.086 million, and forecast expenditure of £3.086 million, be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Finance and Corporate
Resources Committee for the financial year 2024/2025.  Further reports will follow
throughout the year. 
3.2. The budget of £3.086 million for Finance and Corporate Resources is based on the
overall Capital Programme for 2024/2025, as approved by the Executive Committee
on 26 June 2024.  There has been no change to this budget since the last report to
this Committee. 
3.3. The report details the financial position for Finance and Corporate Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2024/2025 Budget   
As detailed in Section 3.2, the revised capital programme for Finance and Corporate
Resources for 2024/2025 is £3.086 million. 
5.2. 2024/2025 Forecast  
Appendix A shows a forecast for the financial year of £3.086 million.  For information,
actual expenditure to 9 August 2024 is £1.073 million. 
4
27

Page 28

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
2 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 2 October 2024 
List of Background Papers
 Financial ledger to 9 August 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy) 
Ext:  2699 (Tel:  01698 452699)
E-mail: graham.booth@southlanarkshire.gov.uk
28

Page 29

Appendix A 
South Lanarkshire Council
Capital Expenditure 2024-2025
Finance and Corporate Resources Programme
For Period 1 April 2024 – 9 August 2024 
Finance and Corporate
Resources Total Original
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000
Information Technology Services  3,086 - - 3,086 3,086 - 1,073
TOTAL 3,086 - - 3,086 3,086 - 1,073 
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Finance and Corporate Resources – Workforce
Monitoring – July to September 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for July to September 2024 relating to Finance
and Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for July to September 2024 relating
to Finance and Corporate Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 11 June 2024 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Finance and
Corporate Resources provides information on the position for July to September
2024. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of September 2024 for
Finance and Corporate Resources. 
The Resource absence figure for September 2024 was 3.2%, this figure has
increased by 0.6% when compared to the previous month and is 2.9% lower than the
Council-wide figure.  Compared to September 2023, the Resource absence figure
has decreased by 0.7%. 
Based on the absence figures at September 2024 and annual trends, the annual
average absence for the Resource for 2024/2025 is 3.1%, compared to a Council-
wide average figure of 5.6%.
5
31

Page 32

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 38 referrals were made this period.  This represents a
decrease of 23 when compared with the same period last year. 
4.3. Accident/Incident Statistics 
There were no accident/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, no disciplinary hearings were held within the Resource.  This
figure has decreased by 1 when compared to the same period last year.  No appeals
were heard by the Appeals Panel, this figure has also remained the same when
compared to last year and no appeals panels were pending.  No grievance or Dignity
at Work complaints were raised within the Resource, these figures remain
unchanged when compared to the same period last year.   
4.5. Analysis of Leavers (Appendix 2a) 
There were 4 leavers within the Resource this period who were eligible for an exit
interview, this is a decrease of 5 when compared with the same period last year. 
Given the transition to the new Fusion system, exit interview data is being collated
for this period and an update will be reported to the next committee. 
5. Staffing Watch 
5.1. Appendix 3 provides the Staffing Watch and shows there has been a decrease of 44
in the number of employees in post from 9 March 2024 to 11 June 2024. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.
32

Page 33

10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
  Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources – 21 August 2024 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Eileen McPake, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Eileen.McPake@southlanarkshire.gov.uk 
33

Page 34

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 October 0.0 0.0 October 3.8 3.2 October 5.8 5.1
November 3.4 3.5 November 0.0 0.0 November 3.4 3.5 November 6.5 6.2
December 4.3 3.3 December 0.0 0.0 December 4.3 3.3 December 7.0 6.6
January 4.3 2.8 January 0.0 0.0 January 4.3 2.8 January 5.8 6.1
February 3.8 3.5 February 0.0 0.0 February 3.8 3.5 February 5.9 6.4
March 3.8 2.6 March 0.0 0.0 March 3.8 2.6 March 6.4 6.3
Annual Average 3.8 3.5 3.1 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.1 Annual Average 5.7 5.4 5.6
Average Apr-Sep 3.6 3.8 3.1 Average Apr-Sep 0.0 0.0 0.0 Average Apr-Sep 3.6 3.8 3.1 Average Apr-Sep 5.1 4.7 5.1
826 0 826 15851
Resource Total
No of Employees at 30 September 2024
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 30 September 2024 No of Employees at 30 September 2024
APT&C Council WideManual Workers
No of Employees at 30 September 2024
34

Page 35

Jul - Sep Jul - Sep
2023 2024
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 26 18
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 61 38
Jul - Sep Jul - Sep
2023 2024
Specified Injuries* 0 0
Over 7 day absences 0 0
Over 3 day absences** 0 0
Minor 1 0
Near Miss *** 0 0
Violent Incident:  Physical**** 0 0
Violent Incident:  Verbal***** 0 0
Total Accidents/Incidents 1 0
Jul - Sep Jul - Sep
2023 2024
Total Number of Hearings 1 0
Total Number of Appeals 0 0
Appeals Pending 0 0
Time Taken to Convene Hearing October - Jul to Sep 2024
0-3 Weeks 4-6 Weeks Over 6 Weeks
0 0 0
Jul - Sep Jul - Sep
2023 2024
Number of Grievances 0 0
Number Resolved at Stage 1 0 0
Number Resolved at Stage 2 0 0
Number Resolved at Stage 3 0 0
Still in Progress 0 0
Jul - Sep Jul - Sep
2023 2024
Number of Incidents 0 0
Number Resolved at Informal Stage 0 0
Number Resolved at Formal Stage 0 0
Number of Appeals 0 0
Appeals in Process 0 0
Still in Process 0 0
RECORD OF DIGNITY AT WORK
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
Appendix 2
FINANCE AND CORPORATE  RESOURCES
12 9
0 1
23 10
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
35

Page 36

Jul - Sep Jul - Sep
2023 2024
Career Advancement 1 0
Child Caring / Caring Responsibilities 0 0
Disatisfaction with terms and conditions 1 0
Further Education 0 0
Moving outwith area 0 0
Personal Reasons 1 0
Poor relationship with managers / colleagues 0 0
Travelling difficulties 0 0
Other 0 0
Number of Exit Interviews conducted 3 0
Total Number of Leavers Eligible for Exit Interview 9 4
Percentage of interviews conducted 33% 0%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
FINANCE AND CORPORATE  RESOURCES
36

Page 37

As at 11 June 2024
Total Number of Employees
F/T P/T F/T P/T
183 14 364 211
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
8.00 90.61 326.03 202.14 51.72 23.00 0.00 0.00 0.00 701.50
As at 9 March 2024
Total Number of Employees
F/T P/T F/T P/T
192 15 387 222
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
6.00 97.71 353.48 210.14 52.78 23.00 0.00 0.00 0.00 743.11
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
816
Appendix 3
JOINT STAFFING WATCH RETURN
FINANCE AND CORPORATE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
772
MALE FEMALE TOTAL
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council-wide Workforce Monitoring – July to
September 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period July to
September 2024
[1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for the period July to September 2024
relating to the Council be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 recruitment monitoring
 staffing watch as at 11 June 2024
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to the Committee.  This report for the Council
provides information on the position for the period July to September 2024. 
4. Attendance Statistics
4.1. Information on absence statistics for the Council and each Resource, as analysed for
September 2024, is provided in Appendices 1 to 8.  Points to note are:- 
The Council’s absence rate for September 2024, shown in Appendix 1, is 6.1%,
which represents an increase of 1.4% when compared with last month and the figure
has increased by 0.8% when compared to September 2023. 
When compared to September 2023, the APT&C absence rate has increased by
1.0%, the teachers’ figure has increased by 0.6% and the manual workers’ figure has
increased by 0.7%. 
Based on annual trends and the absence rate to September 2024, the average
absence rate for the Council for the financial year 2024/2025 is 5.6%. 
6
39

Page 40

In comparison to September 2023 (Appendix 8):- 
 Psychological and musculoskeletal conditions are the main reasons for absence
 Total days lost due to psychological conditions have increased by 35 days
 Total days lost due to musculoskeletal conditions have increased by 637days
 Total days lost due to respiratory conditions have decreased by 242 days
 Total days lost due to stomach, bowel, blood and metabolic disorders have
increased by 383 days 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
5. Occupational Health
5.1. Information on Occupational Health for the period July to September 2024 is
provided in Appendix 9. 
 during the period there were 318 employees referred for a medical examination, a
decrease of 13 when compared to the same period last year.  Both
musculoskeletal and psychological conditions continue to be the main reason for
medical referrals
 a total of 413 employees attended physiotherapy treatment, showing a decrease
of 101 when compared to the same period last year.  Of the 413 employees
referred, 70% remained at work whilst undertaking treatment
 during this period 340 employees were referred to the Employee Support Officer,
showing a decrease of 57 when compared with the same period last year.  Of the
referrals made this period, 87% related to personal reasons
 158 employees were referred to the PAM Assist counselling service this period,
showing an increase of 11 when compared with the same period last year.  All
the referrals made this period were made directly by employees.  Personal
reasons accounted for 28% of the referrals made, 22% were for work related
reasons and 50% was for other reasons
 21 employees were referred for Cognitive Behavioural Therapy this period, an
increase of 18 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident reported for July to September 2024 is contained in Appendix
10. 
 the number of accidents/incidents recorded was 305 of those, 130 have been
investigated and categorised 175 are still in process of being investigated for
categorisation and upload
 of those investigated, 3 specified injuries were recorded
 of those investigated there were 111 minor accidents/incidents
 of those investigated there were 3 accidents resulting in an absence lasting over
3 days during the period
 of those investigated there were 13 accidents resulting in an absence lasting over
7 days during the period 
40

Page 41

7. Discipline, Grievance, Dignity at Work Hearings and Mediation Referrals
7.1. Information on Disciplinary, Grievance Hearings, Dignity at Work and Mediation
Referrals for July to September 2024 is contained in Appendices 11, 12a and 12b. 
 in total, 32 disciplinary hearings were held and concluded across Resources
within the Council, this figure has increased by 4 when compared to the same
period last year
 action was taken in 29 of these cases.  Two appeals were raised against the
outcomes, both of which were not upheld
 our target is to convene disciplinary hearings within 6 weeks, 53% of hearings
met this target
 during the period, no appeals were heard by the Appeals Panel
 at the end of September, no Appeals Panels were pending
 during the period, 5 grievance cases were raised
 during the period, 10 Dignity at Work cases were raised
 during the period, 1 referral for mediation was submitted 
8. Analysis of Leavers and Exit Interviews
8.1. Information on the number of leavers and exit interviews for the period July to
September 2024 is contained in Appendix 13.  Exit interviews are conducted with
employees who leave voluntarily.     
Labour Turnover 
Using information compiled from Resources and Staffing Watch information as at 
11 June 2024, the Council’s turnover figure for July to September 2024 is as follows:- 
219 leavers eligible for exit interviews/15,033 employees in post = Labour Turnover
of 1.5%. 
Based on the figure at September 2024, the annual labour turnover figure for the
financial year 2024/2025 for the Council is 4.8%. 
8.2. Analysis of Leavers and Exit Interviews:- 
 there were a total of 219 employees leaving the Council that were eligible for an
exit interview, an increase of 7 when compared with the same period last year.
Given the transition to the new Fusion system, exit interview data is being
collated for this period and an update will be reported to next Committee. 
9. Recruitment Monitoring
9.1. Information on Recruitment Monitoring for July to September 2024 is contained
within Appendix 14. 
From an analysis of Equal Opportunities Monitoring Forms, the main points to note
are:- 
 overall, 2048 applications and 2013 completed Equal Opportunities Monitoring
Forms were received
 of those applicants who declared themselves as disabled (62), 20 were
shortleeted for interview and 3 were appointed.  
 of those applicants of a black/ethnic minority background (232), 41 were
shortleeted for interview and 2 were appointed.
41

Page 42

 of those applicants who are veterans (18), 4 were shortleeted for interview and 1
was appointed. 
10. Staffing Watch
10.1 There has been an increase of 64 in the number of employees in post from 
9 March 2024 to 11 June 2024.  Details of the staffing watch are contained in
Appendix 15. 
11. Employee Implications
11.1. There are no implications for employees arising from the information presented in
this report. 
12. Financial Implications
12.1. All financial implications are accommodated within existing budgets. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no climate change, sustainability or environmental implications arising
from the information presented in this report. 
14. Other Implications
14.1. There are no implications for risk in terms of the information contained within this
report. 
15. Equality Impact Assessment and Consultation Arrangements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
15.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self-aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Finance and Corporate Resources Committee – 21 August 2024 
List of Background Papers
 Monitoring information provided by Resources
42

Page 43

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk
43

Page 44

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.2 5.2 5.2 April 2.7 2.8 2.9 April 8.8 7.0 7.3 April 5.6 5.1 5.2
May 5.0 5.1 5.4 May 3.6 3.2 3.0 May 7.6 6.2 7.1 May 5.4 5.1 5.3
June 5.0 4.9 5.3 June 2.6 2.2 2.8 June 8.1 6.5 7.2 June 5.3 4.7 5.2
July 4.5 4.0 4.3 July 1.4 1.1 1.0 July 7.4 5.8 6.3 July 4.6 3.8 4.1
August 4.3 4.2 4.6 August 1.4 1.3 1.9 August 7.4 6.2 7.5 August 4.4 4.1 4.7
September 5.2 5.2 6.2 September 2.8 2.9 3.5 September 8.0 7.6 8.3 September 5.4 5.3 6.1
October 5.7 5.2 October 3.4 2.7 October 8.1 7.1 October 5.8 5.1
November 6.3 6.1 November 4.7 4.3 November 8.6 8.1 November 6.5 6.2
December 6.7 6.7 December 5.3 4.8 December 8.9 7.8 December 7.0 6.6
January 5.2 5.8 January 4.3 4.8 January 8.0 7.8 January 5.8 6.1
February 5.7 6.3 February 4.1 4.9 February 7.9 8.0 February 5.9 6.4
March 6.2 6.3 March 4.6 4.1 March 8.3 8.1 March 6.4 6.3
Annual Average 5.4 5.4 5.6 Annual Average 3.4 3.3 3.4 Annual Average 8.1 7.2 7.6 Annual Average 5.7 5.4 5.6
Average Apr-Sep 4.9 4.8 5.2 Average Apr-Sep 2.4 2.3 2.5 Average Apr-Sep 7.9 6.6 7.3 Average Apr-Sep 5.1 4.7 5.1
7363 4036 4452 15851
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Council Wide
APT&C Teachers
No of Employees at 30 September 2024 No of Employees at 30 September 2024
Manual Workers Council Wide
No of Employees at 30 September 2024 No of Employees at 30 September 2024
44

Page 45

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 4.4 3.6 3.2 April 7.3 6.3 6.8 April 6.9 6.0 6.3 April 5.6 5.1 5.2
May 3.9 3.7 3.1 May 6.8 6.3 6.3 May 6.3 5.9 5.9 May 5.4 5.1 5.3
June 3.5 4.3 4.1 June 7.2 5.9 6.4 June 6.7 5.7 6.0 June 5.3 4.7 5.2
July 3.9 2.3 3.8 July 5.9 4.6 4.5 July 5.6 4.3 4.4 July 4.6 3.8 4.1
August 3.4 3.0 3.4 August 6.6 5.2 6.2 August 6.1 4.9 5.7 August 4.4 4.1 4.7
September 3.1 2.5 3.8 September 7.9 7.1 7.5 September 7.1 6.4 6.9 September 5.4 5.3 6.1
October 5.1 2.0 October 7.5 7.0 October 7.1 6.3 October 5.8 5.1
November 4.2 2.6 November 8.3 8.1 November 7.7 7.3 November 6.5 6.2
December 3.7 3.0 December 8.8 7.5 December 8.0 6.8 December 7.0 6.6
January 2.6 3.6 January 7.4 7.4 January 6.7 6.9 January 5.8 6.1
February 3.6 4.0 February 7.4 7.8 February 6.9 7.2 February 5.9 6.4
March 3.9 3.2 March 7.9 7.9 March 7.3 7.2 March 6.4 6.3
Annual Average 3.8 3.2 3.3 Annual Average 7.4 6.8 7.0 Annual Average 6.9 6.2 6.4 Annual Average 5.7 5.4 5.6
Average Apr-Sep 3.7 3.2 3.6 Average Apr-Sep 7.0 5.9 6.3 Average Apr-Sep 6.5 5.5 5.9 Average Apr-Sep 5.1 4.7 5.1
585 2876 3461 15851
Appendix 2
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
45

Page 46

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.0 5.4 April 2.7 2.8 2.9 April 4.0 3.8 4.0 April 5.6 5.1 5.2
May 5.5 5.4 6.0 May 3.6 3.2 3.0 May 4.5 4.2 4.4 May 5.4 5.1 5.3
June 5.1 4.8 5.5 June 2.6 2.2 2.8 June 3.7 3.4 4.1 June 5.3 4.7 5.2
July 3.8 3.4 3.2 July 1.4 1.1 1.0 July 2.5 2.2 2.0 July 4.6 3.8 4.1
August 3.6 4.0 3.9 August 1.4 1.3 1.9 August 2.4 2.5 2.8 August 4.4 4.1 4.7
September 5.8 5.9 6.6 September 2.8 2.9 3.5 September 4.1 4.3 4.9 September 5.4 5.3 6.1
October 6.5 5.5 October 3.4 2.7 October 4.8 4.0 October 5.8 5.1
November 7.9 7.1 November 4.7 4.3 November 6.2 5.6 November 6.5 6.2
December 8.5 8.1 December 5.3 4.8 December 6.8 6.3 December 7.0 6.6
January 6.1 6.6 January 4.3 4.8 January 5.1 5.6 January 5.8 6.1
February 6.8 7.2 February 4.1 4.9 February 5.4 6.0 February 5.9 6.4
March 7.0 7.5 March 4.6 4.1 March 5.7 5.7 March 6.4 6.3
Annual Average 6.0 5.9 6.1 Annual Average 3.4 3.3 3.4 Annual Average 4.6 4.5 4.6 Annual Average 5.7 5.4 5.6
Average Apr-Sep 4.9 4.8 5.1 Average Apr-Sep 2.4 2.3 2.5 Average Apr-Sep 3.5 3.4 3.7 Average Apr-Sep 5.1 4.7 5.1
3303 4036 7339 15851No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
Appendix 3
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Education Resources
Council WideAPT&C Teachers Resource Total
46

Page 47

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 October 0.0 0.0 October 3.8 3.2 October 5.8 5.1
November 3.4 3.5 November 0.0 0.0 November 3.4 3.5 November 6.5 6.2
December 4.3 3.3 December 0.0 0.0 December 4.3 3.3 December 7.0 6.6
January 4.3 2.8 January 0.0 0.0 January 4.3 2.8 January 5.8 6.1
February 3.8 3.5 February 0.0 0.0 February 3.8 3.5 February 5.9 6.4
March 3.8 2.6 March 0.0 0.0 March 3.8 2.6 March 6.4 6.3
Annual Average 3.8 3.5 3.1 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.1 Annual Average 5.7 5.4 5.6
Average Apr-Sep 3.6 3.8 3.1 Average Apr-Sep 0.0 0.0 0.0 Average Apr-Sep 3.6 3.8 3.1 Average Apr-Sep 5.1 4.7 5.1
826 0 826 15851
Manual Workers
No of Employees at 30 September 2024
Resource Total
No of Employees at 30 September 2024
Appendix 4
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 30 September 2024 No of Employees at 30 September 2024
APT&C Council Wide
47

Page 48

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.7 5.3 April 10.6 6.9 7.2 April 7.6 6.2 6.1 April 5.6 5.1 5.2
May 4.5 4.9 5.2 May 8.1 6.1 8.1 May 6.0 5.4 6.4 May 5.4 5.1 5.3
June 4.9 5.4 5.7 June 8.5 6.8 8.4 June 6.4 6.0 6.8 June 5.3 4.7 5.2
July 5.5 5.0 5.3 July 8.9 8.1 8.6 July 6.9 6.2 6.7 July 4.6 3.8 4.1
August 4.7 5.1 5.5 August 7.1 8.5 8.8 August 5.7 6.4 6.9 August 4.4 4.1 4.7
September 4.5 4.7 7.5 September 6.3 7.8 7.4 September 5.2 6.0 7.5 September 5.4 5.3 6.1
October 4.3 4.9 October 7.8 5.2 October 5.8 5.0 October 5.8 5.1
November 4.6 4.8 November 7.8 6.7 November 5.9 5.6 November 6.5 6.2
December 4.4 5.1 December 7.2 7.4 December 5.6 6.0 December 7.0 6.6
January 4.5 4.4 January 5.5 6.0 January 4.9 5.0 January 5.8 6.1
February 4.4 5.2 February 6.2 6.3 February 5.1 5.6 February 5.9 6.4
March 5.3 5.3 March 6.8 7.2 March 5.9 6.1 March 6.4 6.3
Annual Average 4.8 5.0 5.4 Annual Average 7.6 6.9 7.3 Annual Average 5.9 5.8 6.1 Annual Average 5.7 5.4 5.6
Average Apr-Sep 4.9 5.1 5.8 Average Apr-Sep 8.3 7.4 8.1 Average Apr-Sep 6.3 6.0 6.7 Average Apr-Sep 5.1 4.7 5.1
858 555 1413 15851No of Employees at 30 September 2024No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
APT&C Manual Workers Council Wide
48

Page 49

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 6.2 6.5 6.5 April 12.6 9.4 8.8 April 8.3 7.4 7.3 April 5.6 5.1 5.2
May 5.7 5.8 5.8 May 10.1 8.4 9.5 May 7.1 6.6 7.0 May 5.4 5.1 5.3
June 5.9 5.5 6.0 June 11.3 8.6 9.2 June 7.6 6.5 7.0 June 5.3 4.7 5.2
July 6.0 5.4 6.5 July 11.8 8.8 11.2 July 7.9 6.5 8.0 July 4.6 3.8 4.1
August 6.0 4.8 6.9 August 10.8 8.6 11.4 August 7.5 6.0 8.4 August 4.4 4.1 4.7
September 5.9 5.6 7.2 September 9.6 9.3 12.0 September 7.1 6.8 8.8 September 5.4 5.3 6.1
October 5.8 6.5 October 10.4 8.5 October 7.3 7.1 October 5.8 5.1
November 6.0 7.3 November 10.4 9.0 November 7.4 7.8 November 6.5 6.2
December 6.4 7.4 December 10.6 9.5 December 7.7 8.1 December 7.0 6.6
January 5.2 7.0 January 12.0 10.3 January 7.4 8.1 January 5.8 6.1
February 5.8 7.0 February 11.0 9.9 February 7.5 7.9 February 5.9 6.4
March 7.0 7.1 March 10.9 9.4 March 8.2 7.9 March 6.4 6.3
Annual Average 6.0 6.3 6.8 Annual Average 11.0 9.1 9.9 Annual Average 7.6 7.2 7.8 Annual Average 5.7 5.4 5.6
Average Apr-Sep 6.0 5.6 6.5 Average Apr-Sep 11.0 8.9 10.4 Average Apr-Sep 7.6 6.6 7.8 Average Apr-Sep 5.1 4.7 5.1
1791 1021 2812 15851No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
Appendix 6
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Social Work Resources
APT&C Council WideResource TotalManual Workers
49

Page 50

Appendix 7
Absence by long and short term
From: 1 July 2024 to 30 September 2024
Community and Enterprise 3461 1.1 3.3 4.4 1.8 3.9 5.7 2.3 4.6 6.9
Education 7339 0.3 1.7 2.0 1.3 1.5 2.8 2.0 2.9 4.9
Finance and Corporate 826 1.4 2.1 3.5 0.7 1.9 2.6 0.8 2.4 3.2
Housing & Technical 1413 1.9 4.8 6.7 2.0 4.9 6.9 2.1 5.4 7.5
Social Work 2812 2.3 5.7 8.0 1.8 6.6 8.4 2.0 6.8 8.8
Council Overall for July 2024 to
September 2024 15851 1.0 3.1 4.1 1.5 3.2 4.7 2.0 4.1 6.1
July 2024
Total Short
Term %
Total Long
Term %
Resource Total
Absence %
September 2024
Total Short
Term %
Total Long
Term %
Resource
Total
Absence %
Resource No of
employees
Resource
Total
Absence %
August 2024
Total Short
Term %
Total
Long
Term %
50

Page 51

From : 1 September 2024 - 30 September 2024
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1429 30 1122 17 66 14 626 32 899 21 4142 23
Psychological 1177 25 2222 33 147 31 590 30 1498 35 5634 31
Stomach, Bowel, Blood, Metabolic Disorders 543 11 677 10 39 8 220 11 526 12 2005 11
Respiratory 405 9 991 15 100 21 187 10 569 13 2252 12
Other Classification 1183 25 1718 26 122 26 331 17 743 18 4097 23
Total Days Lost By Resource 4737 100 6730 100 474 100 1954 100 4235 100 18130 100
Total Work Days Available
From : 1 September 2023 - 30 September 2023
Total
WDL % Total
WDL % Total
WDL % Total
WDL % Total
WDL %
Musculoskeletal 1299 29 910 14 37 6 509 30 750 21 3505 21
Psychological 1385 31 2052 32 339 51 529 31 1294 37 5599 33
Stomach, Bowel, Blood, Metabolic Disorders 314 7 698 11 91 14 172 10 347 10 1622 10
Respiratory 559 12 1319 21 64 10 212 13 340 10 2494 15
Other Classification 954 21 1385 22 131 20 262 16 788 22 3520 21
Total Days Lost By Resource 4511 100 6364 100 662 100 1684 100 3519 100 16740 100
Total Work Days Available
*WDL = Work Days Lost
Finance and
Corporate
26089 48396
Appendix 8
Attendance Monitoring
Absence Classification
Reasons
Community and
Enterprise
Resources
Social Work
Resources Total WDL
By Reason Percentage
Housing and
Technical
Resources
Education
Resources
PercentageTotal WDL
By ReasonREASONS
Community and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Housing and
Technical
Resources
69051 137247 14944
Social Work
Resources
51869282921715414833270496
51

Page 52

Appendix 9
Teachers Others
70 26 48 9 61 104
93 23 34 12 68 101
Jul-Sep 2023 Jul-Sep 2024 Jul-Sep 2023 Jul-Sep 2024 Jul-Sep 2023 Jul-Sep 2024
152 125 96 58 0 1
59 47 144 115 1 0
95 72 26 18 0 0
23 10 27 43 0 0
65 46 104 106 Social Work 0 2
120 113 397 340 Not Disclosed 2 18
514 413 Total 3 21
M S M S M S M S M S M S
Total (Jul-Sep 2024) 0 34 0 3 0 45 0 65 0 11 0 158
Total (Jul-Sep 2023) 32 0 0 0 92 0 1 0 22 0 147 0
Total 158
147
M = MANAGEMENT REFERRAL      S = SELF REFERRAL
Occupational Health Reports
From: 1 July - 30 September 2024 comparison with 1 July - 30 September 2023
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
Total (Jul-Sep 2024) 318
Total (Jul-Sep 2023) 331
No of Employees Referred For Physiotherapy No of Employees Referred To Employee Support Officer No of Employees Referred For Cognitive Behavioural Therapy
Resource Resource Resource
Community and Enterprise Community and Enterprise Community and Enterprise
Education (Teachers) Education Education
Education (Others) Finance and Corporate Finance and Corporate
Total
Finance and Corporate Housing and Technical Housing and Technical
Housing and Technical Social Work
Social Work Total
Total Referrals (Jul-Sep 2024)   
Total Referrals (Jul-Sep 2023)   
Total
Analysis of Counselling Referrals by Cause
Reason
Work Stress Addiction Personal Anxiety/ Depression Bereavement
52

Page 53

2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024
Specified Injury 0 2 1 0 0 0 0 0 0 0 1 2
Specified Injury (Violence) 0 0 0 1 0 0 0 0 0 0 0 1
Total Specified Injury* 0 2 1 1 0 0 0 0 0 0 1 3
Over 7 Day 7 9 1 0 0 0 2 2 2 2 12 13
Over 7 Day (Violence) 0 0 6 0 0 0 0 0 0 0 6 0
Total Over 7 Day** 7 9 7 0 0 0 2 2 2 2 18 13
Over 3 Day 0 1 1 0 0 0 1 0 3 2 5 3
Over 3 Day (Violence) 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3 Day** 0 1 1 0 0 0 1 0 3 2 5 3
Minor Injury 23 23 54 5 1 0 5 4 23 1 106 33
Near Miss 4 3 3 0 0 0 0 0 3 1 10 4
Violence (Physical) 15 5 334 52 0 0 1 0 21 3 371 60
Violence (Verbal) 4 2 22 10 0 0 3 0 9 2 38 14
Total Minor*** 46 33 413 67 1 0 9 4 56 7 525 111
Total Finalised 53 45 422 68 1 0 12 6 61 11 549 130
Accident 0 6 2 9 0 0 0 4 0 6 2 25
Incident 1 1 1 12 0 0 1 3 0 0 3 16
Violence (Physical) 0 0 2 114 0 0 1 0 0 4 3 118
Violence (Verbal) 0 1 0 11 0 0 0 0 0 2 0 14
Near Miss 0 1 0 1 0 0 0 0 0 0 0 2
Total to be investigated**** 1 9 5 147 0 0 2 7 0 12 8 175
Total Events/Month 54 54 427 215 1 0 14 13 61 23 557 305
Finance and Corporate Housing & Tech Social Work TOTAL
**Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury)
***A minor injury is an injury not covered by  Over 7 day, Over 3 day or Specified
****In process relates to records not yet investigated/defined by managers
*Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or
penetrating injury as defined by the HSE
Appendix 10
Analysis of Accidents / Incidents
From: 1 July - 30 September 2024 comparison with 1 July - 30 September 2023
Accidents by Month of Occurrence
Community and Enterprise Education
53

Page 54

APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total
Community and Enterprise 6 10 N/A 16 0 0 N/A 0 6 10 N/A 16 1 8 7 56% 16.56
Education 2 0 4 6 1 0 0 1 1 0 4 5 2 1 3 50% 6
Housing and Technical 5 2 N/A 7 2 0 N/A 2 3 2 N/A 5 2 3 2 71% 7
Social Work 2 1 N/A 3 0 0 N/A 0 2 1 N/A 3 0 0 3 0% 3
Total  (Jul-Sep 2024) 15 13 4 32 3 0 0 3 12 13 4 29 5 12 15 53% 32
Total  (Jul-Sep 2023) 2 25 1 28 1 4 0 5 1 21 1 23 18 6 4 39% 28
APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total
Total  (Jul-Sep 2024) 0 2 0 2 0 0 0 0 0 0 0 0 0 2 0 2 0
Total  (Jul-Sep 2023) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 July - 30 September 2024
Appeal's Panel
Total 0
Not Upheld Total
Appeals
Pending
0
Withdrawn
0
Resource
Resource
Action Taken
Upheld Upheld in Part
Manual/ Craft
Outcome of Disciplinary Hearings
Manual/ Craft
Upheld
APT&C
Upheld in Part
Teachers
% Held within
6 Weeks
No of Appeals
No Action
APT&C 4-6 6+3Teachers Total
No of Disciplinary Hearings
000
Appendix 11
Outcome of Appeals
Not Upheld
From: 1 July - 30 September 2024 comparison with 1 July - 30 September 2023
Appeals pending to date
Record of Disciplinary Hearings
No of weeks to convene Disciplinary Hearing
Total
54

Page 55

Appendix 12a
Record of Grievances
From: 1 July - 30 September 2024 comparison with 1 July - 30 September 2023
Grievances No of Grievances No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Total (Jul-Sep 2024) 5 0 2 0 3
Total (Jul-Sep 2023) 0 0 0 0 0
Dignity at Work
From: 1 July - 30 September 2024 comparison with 1 July - 30 September 2023
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Total (Jul-Sep 2024) 10 0 1 0 0 9
Total (Jul-Sep 2023) 5 0 1 0 0 4
55

Page 56

Appendix 12b
Referrals for Workplace Mediation
As at September 2024
Workplace Mediation Jul-24 Aug-24 Sep-24
No of Referrals 0 1 0
*No of Successful Cases 0 0 0
*No of Unsuccessful Cases 0 0 0
No of cases unsuitable for mediation 0 0 1
Workplace Mediation Jul-23 Aug-23 Sep-23
No of Referrals 0 0 1
*No of Successful Cases 0 0 0
*No of Unsuccessful Cases 0 0 0
No of cases unsuitable for mediation 1 1 0
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
56

Page 57

Appendix 13
From 1 July - 30 September 2024
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 1 0 0 0 0 1 33%
Moving outwith area 0 1 0 0 0 1 33%
Other 1 0 0 0 0 1 33%
Number of exit interviews
conducted 2 1 0 0 0 3
Total no. of leavers per Resource
eligible for an exit interview 68 107 4 18 22 219
% of leavers interviewed 3% 1% 0% 0% 0% 1%
From 1 July - 30 September 2023
Number of exit interviews
conducted 17 28 3 6 19 73
Total no. of leavers per Resource
eligible for an exit interview 57 92 9 16 38 212
% of leavers interviewed 30% 30% 33% 38% 50% 34%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
57

Page 58

Appendix 14
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
2013 567 152 28% 8% 27%
826 201 39 24% 5% 19%
1182 352 103 30% 9% 29%
62 20 3 32% 5% 15%
1684 436 104 26% 6% 24%
317 120 37 38% 12% 31%
1754 512 139 29% 8% 27%
232 41 2 18% 1% 5%
18 4 1 22% 6% 25%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
4364 1740 313 40% 7% 18%
1328 476 80 36% 6% 17%
3033 1048 187 35% 6% 18%
185 86 10 46% 5% 12%
3424 1282 212 37% 6% 17%
1314 376 64 29% 5% 17%
3750 1414 259 38% 7% 18%
572 258 10 45% 2% 4%
25 15 0 60% 0% 0%
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 July - 30 September 2024
Total Number of applications received: 2048
Total Number of Equal Opportunities Monitoring forms received: 2013
Total Number of posts recruited for: 268
Total Number of appointments: 167
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
From : 1 July - 30 September 2023
Total Number of applications received: 4694
Total No of applicants aged under 50
Total Number of Equal Opportunities Monitoring forms received: 4364
Total Number of posts recruited for: 524
Total Number of appointments: 361
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
58

Page 59

Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3173 1237 275 233 1428 2245.16 5.00 1531.38 382.28 258.25 46.55 16.70 0.00 5.00 0.00
Education - Others 3246 117 103 613 2413 2352.33 5.00 1089.86 999.77 134.44 46.00 10.00 0.00 62.46 4.80
Education - Teachers 3885 691 80 2189 925 3498.55 0.00 0.00 0.00 0.00 0.00 1.00 0.00 4.60 3492.95
Finance & Corporate Resources 772 183 14 364 211 701.50 8.00 90.61 326.03 202.14 51.72 23.00 0.00 0.00 0.00
Housing & Technical 1268 779 25 332 132 1208.19 3.00 193.51 631.52 341.56 29.60 9.00 0.00 0.00 0.00
Social Work Resources 2689 195 207 988 1299 2354.75 3.00 323.31 1441.76 494.47 59.30 32.91 0.00 0.00 0.00
8861.93 (excluding Teachers)
Total All Staff 15033 3202 704 4719 6408 12360.48 24.00 3228.67 3781.36 1430.86 233.17 92.61 0.00 72.06 3497.75
Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 2993 1112 273 198 1410 2074.37 5.00 1412.35 348.58 244.59 43.55 15.30 0.00 5.00 0.00
Education - Others 3311 128 101 661 2421 2416.57 5.00 1179.23 962.79 146.09 46.00 10.60 0.00 62.06 4.80
Education - Teachers 3880 696 80 2181 923 3492.85 0.00 0.00 0.00 0.00 0.00 1.00 0.00 6.60 3485.25
Finance & Corporate Resources 816 192 15 387 222 743.11 6.00 97.71 353.48 210.14 52.78 23.00 0.00 0.00 0.00
Housing & Technical 1273 787 24 330 132 1213.09 3.00 188.11 630.82 352.56 29.60 9.00 0.00 0.00 0.00
Social Work Resources 2696 202 203 994 1297 2359.33 3.00 327.92 1441.30 496.46 56.30 34.35 0.00 0.00 0.00
8806.47 (excluding Teachers)
Total All Staff 14969 3117 696 4751 6405 12299.32 22.00 3205.32 3736.97 1449.84 228.23 93.25 0.00 73.66 3490.05
Male Female Salary Band
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
Analysis by Resource
Quarterly Joint Staffing Watch Return : Number Employed On 11 June 2024
Analysis by Resource
QUARTERLYJOINT STAFFING WATCH RETURN : NUMBER EMPLOYED ON 9 MARCH 2024
Appendix 15
Total Number of Employees Full-Time Equivalent
59

Page 60

60

Page 61

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Treasury Management Activity - 2024/2025 Second
Quarter Review 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a second quarter review of Treasury Management Activity for 2024/2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted.
[1recs]
3. Background
3.1. In order to provide members with information on the Council’s Treasury Management
activities, a quarterly report is presented to this Committee.  This report covers the
period 1 April 2024 to 30 September 2024. 
4. Market Performance
4.1. At the time of writing the base rate was 5.00% and the Bank of England Asset
Purchase Programme (commonly referred to as its policy of quantitative easing) was
£659bn.  The Council’s Treasury Management Advisers are predicting that the base
rate will fall to 4.50% by December 2024 and to 4.00% by March 2025. 
5. Debt Management and Borrowing Strategy
5.1. The Council began the year with debt of £1,034.532 million with fixed rate loans from
the Public Works Loans Board (PWLB) making up 97.25% of the debt. 
5.2. Table 1 shows the movement in borrowing from 1 April 2024 to 30 September 2024. 
Table 1 – Movement in Borrowing to 30 September 2024 
Balance as
at
01/04/2024
£m 
New
Borrowing
£m 
Debt
Maturing
£m 
Debt
Repaid
£m 
Balance as
at
30/09/2024
£m
Increase/
Decrease
in
Borrowing
£m
Short Term
Borrowing 53.770 0.000 (46.486) 0.00 7.284 (46.486)
Long Term
Borrowing 980.762 0.000 0.00 0.00 980.762 0.000
TOTAL
BORROWING 1,034.532 0.000 (46.486) 0.00 988.046 (46.486)
7
61

Page 62

5.3. Short term borrowing reflects borrowing which will mature in the coming year, or
where the debt can be recalled in the coming year. 
5.4. In 2012/2013, HM Treasury introduced a “certainty rate” to enable eligible local
authorities to access cheaper PWLB funding, with a 20 basis point (0.20%) reduction
on the standard rate.  South Lanarkshire Council has access to this reduced rate. 
5.5. The Council has an expected funding requirement of £163.849 million for 2024/2025. 
5.6. The Executive Director (Finance and Corporate Resources), under delegated
powers, will continue to take the most appropriate form of borrowing depending on
the prevailing interest rates at the time, taking into consideration the differential
between investment earnings and debt costs that remains high. 
5.7. No borrowing has been taken so far in the current financial year.  Instead, cash
balances have been used to fund capital spend.  Borrowing to replace these
balances will be required going forward. 
6. Investment Activity
6.1. On a daily basis, the Treasury Management section within Finance and Corporate
Resources manages the Council’s cash balances.  These balances can result from
day-to-day cash flow situations where income has been received before expenditure
has taken place, and from the balances held in earmarked reserves for use at a later
date.  It is the responsibility of the section to manage these funds.  The primary
consideration when making deposits is the security of funds.  Secondary to this,
consideration is given to ensuring we have access to funds when necessary, and
that these funds are working as well as they can for the Council. 
6.2. The Prudential Indicators, Treasury Management Strategy and Annual Investment
Strategy Report for 2024/2025 was approved by South Lanarkshire Council on 21
February 2024.  This included details of permitted investments for the Council. 
6.3. Prior to depositing funds with any bank or building society, checks are made with the
Council’s treasury adviser, Link Asset Services, that the institution is considered safe
and that any deposit conforms to their recommended time duration as determined by
their Rating Methodology.  This methodology uses credit ratings, rating watches and
outlooks and credit default swap (CDS) prices to establish a suggested time duration
for deposits. 
6.4. Deposits made in the period 1 April 2024 to 30 September 2024 totalled
£915.025 million.  This is the cumulative deposits placed over this period.  This is
broken down per sector and institution in Table 2. 81.53% of these deposits were
made with the UK Government through the Debt Management Office (DMO) deposit
facility. 
6.5. In order to manage their cash flow over the short term, local authorities, as part of
normal treasury management activity, will place money on deposit with other local
authorities.  Deposits placed with other local authorities account for 12.57% of
deposits.  The remaining 5.90% was placed in instant access call accounts with
Bank of Scotland.  
62

Page 63

Table 2 – Investment Activity 1 April 2024 to 30 September 2024 
Counterparty
Deposit
Totals (£m)
% of
Total
Deposits
Average
Interest
Rate
Deposits in UK Government   
Debt Management Account Deposit
Facility 746.050 81.53% 5.12%
Total Deposits in UK Government 746.050 81.53% 5.12%    
Deposits in UK Local Authorities 115.000 12.57% 5.12%    
Deposits in UK Banks and Building
Societies:   
Bank of Scotland 53.975 5.90% 5.13%
Total Deposits in UK Banks and
Building Societies 53.975 5.90% 5.13%
Total Deposits 01/04/2024 to 30/09/2024 915.025 100.00% 5.12% 
6.6. The average interest rates achieved from the deposits are also shown in Table 3. 
Interest rates achievable for deposits have been decreasing since the base rate was
cut in August 2024.  There is still a differential between these and the rates at which
the Council can borrow. 
6.7. Actual deposits as at 30 September 2024 totalled £85.350 million. 
7. Management of Risk
7.1. It is recognised that no Treasury Management activity is without risk and practices
are put in place in order to limit risk.  As noted in section 6.2, the Treasury
Management Strategy was approved in February 2024 and set a framework for
Treasury Management activities in 2024/2025.  It also set limits on debt and
investments in order to mitigate risks. 
7.2. The Annual Investment Strategy for 2024/2025, also approved in February 2024,
included details on how risk would be managed for all permitted investments.  This
included criteria for placing deposits with the Debt Management Office (DMO), UK
Local Authorities, Banks and Building Societies and Money Market Funds. 
7.3. Part of the criteria for counterparties is meeting minimum credit ratings with the three
main rating agencies.  A credit rating evaluates the credit worthiness of an
organisation.  It is an evaluation made by a credit rating agency of the organisation’s
ability to pay back the debt and the likelihood of default. 
7.4. Tables 3 to 5 show a breakdown of deposits with details of the credit ratings of banks
and building societies used from 1 April 2024 to 30 September 2024.  Deposits with
the DMO are with the UK Government and so have a rating equivalent to the UK’s
sovereign rating.  Deposits with local authorities are considered to be of very high
credit quality. 
63

Page 64

Table 3 – Fitch Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA-) 746.050m 81.53%
Deposits with Local Authorities 115.000m 12.57%
A+ F1 53.975m 5.90%
Total  915.025m 100.00% 
Table 4 – Moody’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (Aa3) 746.050m 81.53%
Deposits with Local Authorities 115.000m 12.57%
A1 P-1 53.975m 5.90%
Total  915.025m 100.00% 
Table 5 – Standard and Poor’s Ratings 
Long Term Rating Short Term Rating Deposits
Totals
Percentage
of Total
Deposits
Deposits with DMO / UK Government (AA) 746.050m 81.53%
Deposits with Local Authorities 115.000m 12.57%
A+ A-1 53.975m 5.90%
Total  915.025m 100.00% 
7.5. The tables above show that 94.10% of deposits were made with counterparties of
very high credit quality (DMO/UK Government and other local authorities).  The
remaining 5.90% were deposits in instant access accounts with Bank of Scotland. 
7.6. The graph at Appendix 1 shows the duration of deposits made from 1 April 2024 to
30 September 2024.  The graph shows that, since 1 April 2024, all deposits have
been made for 1 year or less.  The maximum maturity period of 113 days was for a
deposit of £10.000 million to a local authority. 
8. Next Quarter Investment Plans
8.1. The current investment framework will be continued in the next quarter.  Deposits will
continue to be placed with the institutions where their ratings are consistent with the
Council’s approved criteria.  Deposits will also continue to be placed with the DMO
and UK local authorities. 
8.2. Treasury Bills will be used when they return a higher yield than deposits in the DMO
for the same, very low risk. 
8.3. We will continue to work with our Treasury Management Advisers, Link, to ensure
we gain all information available on counterparties before any deposits are made. 
64

Page 65

9. Treasury Management Indicators
9.1. The purpose of these indicators is to contain the activity of the treasury function
within certain limits, thereby managing risk and reducing the impact of an adverse
movement in interest rates.  However, if these are set to restrictive limits, they will
impair the opportunities to reduce costs/improve performance.  The indicators are
detailed in sections 9.2 to 9.5. 
9.2. Limits for External Debt: The operational and authorised limits for external debt for
2024/2025 were set in the Prudential Indicators, Treasury Management Strategy and
Annual Investment Strategy 2024/2025 approved by South Lanarkshire Council on
21 February 2024.  These are shown in Table 6, along with a column showing the
difference between the actual debt level and the limits (headroom). 
Table 6 – Limits for External Debt 
Estimate as
per 2024/25
Strategy
Minimum
Headroom
to Limits in
period
Headroom
as at
30/09/2024 
£m £m £m
Operational Limit for external debt 1,410.000 375.468 421.954
Authorised Limit for external debt 1,430.000 395.468 441.954 
9.3. The indicator shows that we have not breached the operational and authorised limits
to 30 September 2024.  There has been a minimum level of headroom of £395.468m
between actual and authorised level for external debt in the period to 30 September
2024. 
9.4. Limits on Maturity Structure: By setting limits on the maturity structure of
borrowing, the exposure to large concentrations of debt needing to be replaced at
the same time in the future at currently unknown rates can be limited.  This
effectively places a limit on exposure to longer term interest rate movement.  This is
shown in Table 7. 
Table 7 – Limits on Maturity Structure 
Maturity Structure of Borrowing  
Upper
Limit 
Lower
Limit
Maximum
for period
to 30/09/24 
Actuals as
at 30/09/24
Under 12 months 30% 0% 0.74% 0.74%
12 months and 24 months 40% 0% 12.11% 12.11%
24 months and 5 years 50% 0% 3.92% 3.92%
5 years and 10 years 60% 0% 21.41% 21.41%
10 years and 20 years 60% 0% 19.13% 19.13%
20 years and 30 years 70% 0% 15.36% 15.36%
30 years and 40 years 80% 0% 27.33% 27.33%
40 years and 50 years 90% 0% 0.00% 0.00%
50 years and above 90% 0% 0.00% 0.00% 
9.5. The indicator shows that the upper limits for all maturity profiles have not been
breached to 30 September 2024.  
65

Page 66

10. Employee Implications
10.1. There are no employee implications. 
11. Financial Implications
11.1. The current rate of interest receivable remains relatively low but has increased over
recent months.  Any deposit interest received offsets Loan Charges made to the
Council’s Revenue budget. 
11.2. The costs of borrowing for capital expenditure have been built into the long-term
Revenue Budget Strategy. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no implications for climate change or sustainability in terms of the
information contained in this report. 
12.2. There is also no requirement to carry out an environmental impact assessment in
terms of the information contained within this report. 
13. Other Implications
13.1. Section 7 of this report provides details of how investment risk is managed. 
14. Equality Impact Assessment and Consultation Arrangements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
14.2. There is no requirement to carry out any consultation in terms of the information
provided in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy
2024/2025, South Lanarkshire Council, 21 February 2024
 Treasury Management Activity – 2024/2025 First Quarter Review, Finance and
Corporate Resources Committee, 21 August 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
66

Page 67

Appendix 1
67

Page 68

68

Page 69

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee 
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Prudential Indicators, Treasury Management Activity
and Annual Investment Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an overview of the Prudential Code Indicators and Treasury Management
Activity for 2023/2024
 allow Committee to scrutinise the Annual Investment Report for 2023/2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Treasury Management Activity Report for 2023/2024 (Section 4 and
Appendix 1), be noted;
(2) that the 2023/2024 Treasury Management and Prudential Code Indicators
(Section 5 and Appendix 2), be noted;
(3) that the Treasury Management Activity Report (Appendix 1) and the Treasury
Management and Prudential Indicators (Appendix 2) be referred to the
Executive Committee for noting;
(4) that the 2023/2024 Annual Investment Report (Appendix 3) be endorsed; and
(5) that the 2023/2024 Annual Investment Report (Appendix 3) be referred to the
Executive Committee prior to submission to the Council for formal approval in
line with The Local Government Investments (Scotland) Regulations 2010. 
3. Background 
3.1. The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of
Practice for Treasury Management requires councils to prepare an annual report on
their Treasury Management Activities.  The report covering the Council’s Treasury
Management Activity during 2023/2024 is summarised in Section 4 of the report and
provided in detail in Appendix 1. 
3.2. The Council’s capital programme is partly funded by planned borrowing.  The CIPFA
Prudential Code provides a framework to assist the management of the financial
implications of borrowing and helps to demonstrate that the borrowing is both
affordable and prudent.  The Code requires councils to prepare a series of financial
indicators that demonstrate affordability, prudence and sustainability with regard to
capital financing decisions. 
8
69

Page 70

3.3. Estimates of these indicators are reported to the Finance and Corporate Resources
Committee at the start of each year, with selected indicators then reported on an
actual basis at the end of the year.  The year end indicators for 2023/2024 are noted
in Section 5 of the report (detail in Appendix 2). 
3.4. The Local Government Investments (Scotland) Regulations 2010 require local
authorities to prepare an Annual Investment Strategy before the start of the financial
year and an Annual Investment Report after the financial year end.  Both documents
are required to be approved by full Council. 
3.5. The Annual Investment Report for 2023/2024 is summarised in Section 6 of this
report (detail in Appendix 3). 
3.6. The Annual Investment Strategy for 2023/2024, approved in February 2023,
recognised that any investment activity carries an element of risk.  Appendix 4
details the investments that the Council were permitted to use in 2023/2024, the
associated risks and the controls and limits that were put in place to mitigate these
risks. 
3.7. The figures contained within this report are taken or calculated from South
Lanarkshire Council’s Annual Accounts for 2023/2024. 
4. Treasury Management Activity 2023/2024
4.1. Appendix 1 details the Treasury Management Activity for 2023/2024. 
4.2. The Council ended the year with borrowing of £1,034.532 million with fixed rate
loans from the Public Works Loans Board (PWLB) making up 98.58% of the debt. 
Fixed rate loans help to build in certainty to the calculation of future loan charges
which forms a significant element of the Council’s long term Revenue Budget
Strategy. 
4.3. The Council’s pooled interest rate for 2023/2024 was 4.12% (3.59% in 2022/2023),
with an expenses rate of 0.07%.  The overall cost of borrowing will increase as debt
levels increase to fund the capital programme. 
4.4. Total deposits at the end of the year totalled £13.475 million with the level varying
throughout the year due to the timing of expenditure and receipts. 
4.5. During 2023/2024, the Council placed £1,599.249 million of deposits on a cumulative
basis.  All deposits made by the Council were in line with approved lending limits and
credit rating criteria.  The level of investment return was £10.202 million. 
5. Treasury Management and Prudential Code Indicators – 2023/2024 
5.1. The Council is required by the Prudential Code to report the actual prudential
indicators after the closure of the financial year.  Appendix 2 details the indicators for
2023/2024. 
5.2. The General Fund Capital Expenditure for 2023/2024 was £58.094 million which is
£20.202 million less than estimated in the Prudential Indicators, Treasury
Management Strategy and Annual Investment Strategy report presented to South
Lanarkshire Council in February 2024.  The details of this have been reported to the
Executive Committee over recent months, with a final position being reported on 26
June 2024.
70

Page 71

5.3. The Housing Revenue Account Capital Expenditure in 2023/2024 was
£62.240 million which is £5.203 million less than the estimate reported to South
Lanarkshire Council in February 2024.  The details of this have been reported to the
Executive Committee over recent months, with a final position being reported on 26
June 2024. 
5.4. The Council’s gross borrowing position for 2023/2024 was £1,206.568 million.  This
consists of external borrowing of £1,034.532 million and the PPP Finance Lease
Liability of £172.036 million.  Gross borrowing is less than the capital financing
requirement of £1,409.244 million due to the fact that no long-term borrowing was
taken during 2023/2024. 
5.5. The Council used its cash balances available in lieu of the remainder of its borrowing
requirement for the year.  Borrowing before cash was required would incur a cost of
carry as the interest rates achievable on deposits continue to be less than the
interest rates on borrowing. 
5.6. By borrowing only £86.700 million, interest costs for 2023/2024 were reduced and
savings from this used to support the Revenue Budget Strategy going forward. 
5.7. The Capital Financing Requirement for the General Fund is £11.186 million lower
than forecast and for HRA is £8.655 million lower than forecast.  For both the
General Fund and HRA this is due to changes in the borrowing required to fund the
capital programmes reflecting the timing of expenditure and movements in other
sources of funding. 
5.8. One indicator covers borrowing and sets limits on the level of borrowing that the
Council can have.  The Operational Boundary is the expected borrowing position, but
it can vary due to changes in the cash flow and temporary breaches are acceptable. 
In contrast, the Authorised Limit represents the maximum level of debt the Council
can afford and should not be breached.  The Council remained within both the
Operational Boundary and Authorised Limit for gross debt during 2023/2024. 
6. Annual Investment Report – 2023/2024
6.1. The Council is required by The Local Government Investments (Scotland)
Regulations 2010 to prepare an Annual Investment Report after the financial year
end.  The Annual Investment Report for financial year 2023/2024 is detailed in
Appendix 3 and summarised below. 
6.2. During 2023/2024, the Council placed £1,599.249 million of deposits on a cumulative
basis.  All deposits made by the Council were in line with approved lending limits and
credit rating criteria.  £1,551.220 million (97.00%) of deposits were made with
counterparties of very high credit quality (UK Government – Debt Management
Account Deposit Facility (DMADF), and other local authorities).  The remaining
£48.029 million (3.00%) was deposited in instant access call accounts with Bank of
Scotland and Royal Bank of Scotland. 
6.3. In order to manage liquidity risk, the Council held an average of £5.215 million in
bank accounts with instant access. 
6.4. No borrowing in advance was taken during 2023/2024. 
7. Employee Implications
7.1. None
71

Page 72

8. Financial Implications
8.1. The financial impact from treasury activity and borrowing for capital expenditure has
been built into the long-term Revenue Budget Strategy. 
8.2. In 2023/2024 the amounts charged to the General Fund in relation to debt (loan
charges) totalled £41.750 million.  HRA loan charges totalled £9.880 million.  These
costs were met from within approved Revenue Budgets. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change or sustainability in terms of the
information contained in this report. 
9.2. There is also no requirement to carry out an environmental impact assessment in
terms of the information contained within this report. 
10. Other Implications
10.1. South Lanarkshire Council recognises that any Treasury Management Activity will
carry an element of risk.  It is important that risk is identified and controls put in place
to limit those risks. 
10.2. The Council has complied with all of the relevant statutory and regulatory
requirements which limit the levels of risk associated with its treasury management
activities.  In particular, its adoption and implementation of both the Prudential Code
and the CIPFA Treasury Management Code of Practice means both that its capital
expenditure is prudent, affordable and sustainable, and its treasury practices
demonstrate a low-risk approach. 
10.3. The CIPFA Treasury Management Code of Practice adopted by the Council, places
Credit and Counterparty risk at the forefront of treasury risks. 
10.4. South Lanarkshire Council recognises that any investment activity will carry an
element of risk.  It is important that risk is identified and controls put in place to limit
and manage those risks. 
10.5. Appendix 4 to this report details the investments that the Council was permitted to
use in 2023/2024, the associated risks and the controls and limits that were put in
place to mitigate these risks. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
11.2. There is no requirement to undertake an integrated impact assessment or any
consultation in relation to the content of the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Value: Accountable, effective, efficient and transparent
72

Page 73

Previous References
 Prudential Indicators, Treasury Management Strategy and Annual Investment Strategy
2023/2024, South Lanarkshire Council, 22 February 2023
 Treasury Management Activity – 2022/2023 Third Quarter Review, Finance and
Corporate Resources Committee, 15 February 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk 
73

Page 74

Appendix 1
Treasury Management Activity Report 2023/2024 
1. Background
1.1. The Annual Treasury Management Activity Report is a requirement of the Council’s
reporting procedures and covers 2023/2024.  The report also includes the Treasury
Management Indicators for 2023/2024 in accordance with the requirements of the
CIPFA Code of Practice for Treasury Management in the Public Sector and actual
Prudential Indicators for 2023/2024 in accordance with the requirements of the
Prudential Code. 
2. Introduction
2.1. The Council’s treasury management activities are regulated by a variety of
professional codes and statutes and guidance: 
2.2. The Local Government in Scotland Act 2003 (the Act), which provides the powers to
borrow and invest as well as providing controls and limits on this activity;
 The Act permits the Scottish Ministers to set limits either on the Council or
nationally on all local authorities restricting the amount of borrowing which may
be undertaken (although no restrictions were made in 2009/10);
 Statutory Instrument (SSI) 29 2004, requires the Council to undertake any
borrowing activity with regard to the CIPFA Prudential Code for Capital Finance
in Local Authorities, and therefore to operate the overall treasury function with
regard to the CIPFA Code of Practice for Treasury Management in the Public
Services;
 This Council has adopted the CIPFA Code of Practice for Treasury Management
in the Public Sector and operates its treasury management service in compliance
with this Code and the above requirements.  These require that the prime
objective of treasury management activity is the effective management of risk,
and that its borrowing activities are undertaken in a prudent, affordable and
sustainable basis.
2.3. The CIPFA Code of Practice requires reports to be made on its treasury
management policies, practices and activities, including, as a minimum, an annual
strategy and plan in advance of the year, a mid-year review and an annual report
after its close. 
2.4. This report will cover:
 A summary of the strategy agreed for 2023/2024;
 The Council’s treasury position at 31 March 2024;
 Economic Background for 2023/2024;
 Actual Performance During 2023/2024;
 Risk Management; and
 Treasury Management and Prudential Indicators (see Appendix 2) 
3. The Strategy Agreed for 2023/2024
3.1. At the time of determining the strategy for 2023/2024, economic and interest rate
forecasting remained difficult with many external influences weighing on the UK. 
3.2. Public Works Loans Board (PWLB) rates and gilt yields were expected to remain
volatile as markets reacted to emerging economic data, with the overall long-term
trend being for them to decrease slightly during 2023/2024.
74

Page 75

3.3. The differential between investment earnings and debt costs was expected to remain
high throughout 2023/2024.  This “cost of carrying” would have to be considered if
borrowing was taken before our cash flow required funds as returns on deposits
were expected to remain lower than the rate paid on borrowing. 
3.4. The borrowing strategy adopted was to monitor interest rates, undertake planned
borrowing at the best time, while investigating opportunities where possible to
improve the management of our existing loan portfolio. 
3.5. The main consideration when investing surplus funds was to be the security of the
transaction.  Liquidity would then be considered, and investments would only be
made for prudent time periods.  Only after considering security and liquidity would
the yield to be gained from the investment be considered. 
3.6. The Executive Director of Finance and Corporate Resources would apply
appropriate restrictions to the Council’s counterparty list to ensure the security of
deposits. 
4. Treasury Position at 31 March 2024
4.1. The Council began the year with debt of £1,036.302m of which 99.18% was fixed
rate loans from the PWLB.  By 31 March 2024, debt had decreased to £1,034.532m
with fixed rate loans from the Public Works Loans Board (PWLB) making up 98.58%
of the debt. 
4.2. Table 1 below shows the movement in borrowing to 31 March 2024. 
Table 1 – Movement in Borrowing from 1 April 2023 to 31 March 2024. 
Balance as
at
01/04/2023
£m 
New
Borrowing
£m 
Debt
Maturing
£m 
Debt
Repaid
£m 
Balance as
at
31/03/2024
£m
Increase/
Decrease
in
Borrowing
£m
Short Term
Borrowing 21.770 20.000 (21.770) 0.000 20.000 (1.770)
Long Term
Borrowing 1,014.532 0.000 00000 0.000 1,014.532 0.000
TOTAL
BORROWING 1,036.302 20.000 (21.770) 0.000 1,034.532 (1.770) 
4.3. The Treasury Position at the 31 March 2024 compared with the previous year is
shown in Table 2 overleaf: 
75

Page 76

Table 2 – Treasury Position as at 31 March 2024 
31 March 2024 31 March 2023 
Principal Average
Rate
Principal Average
Rate
Fixed PWLB £1,006.032m 3.80% £1,027.802m 3.80%
Total Fixed Rate Debt £1,006.032m 3.80% £1,027.802m 3.80%
Market £8.500m 5.46% £8.500m 5.46%
Temporary Borrowing £20.000m 7.20% £0.000m 0.00%
Total Variable Rate Debt £28.500m 6.68% £8.500m 5.46%
Total Debt £1,034.532m 3.88% £1,036.302m 3.81%
Total Deposits £13.475m 5.19% £160.770m 3.96%
4.4. The gross debt position decreased by £1.770m from 31 March 2023, accounted for
by repayments of PWLB (£21.770m) offset by new temporary borrowing (£20.000m)
taken from a local authority for cashflow purposes on 25 March 2024.
4.5. The Council’s pooled cost of borrowing is measured on an equated debt basis which
takes account of how the Council’s capital expenditure was funded throughout the
year.  The pooled interest cost together with the expenses rate for 2023/2024 and
the previous two years is shown in Table 3 below: 
Table 3 – Pooled Cost of Borrowing
Year Loans Fund
Pooled Rate
Loans Fund
Expenses Rate
2023/24 4.12% 0.07%
2022/23 3.59% 0.07%
2021/22 3.54% 0.07%
5. Economic Background for 2023/2024
5.1. The base rate began the year at 4.25%, and following a series of increases by the
Bank of England ended the year at 5.25%. 
5.2. Gilt yields and PWLB rates were volatile throughout 2023/2024.  The average PWLB
rates at the start of 2023/2024 was 4.54%.  This increased to a peak of 5.79% in
October 2023 before falling back to 5.06% by the 31 March 2024. 
5.3. Details of significant interest rates during 2023/2024 are shown in Table 4 below. 
Table 4 – Significant Interest Rates  
Borrowing Rates 
Bank
Base
Rate
1
Year
PWLB
5
Year
PWLB
10
Year
PWLB
20
Year
PWLB
30
Year
PWLB
40
Year
PWLB
50
Year
PWLB
High 5.25% 6.36% 5.93% 5.53% 5.94% 5.96% 5.94% 5.90%
Average 5.03% 5.54% 4.99% 4.96% 5.32% 5.33% 5.30% 5.26%
Low 4.25% 4.65% 4.13% 4.20% 4.58% 4.58% 4.53% 4.46% 
76

Page 77

6. Actual Performance during 2023/2024
6.1. Capital expenditure for the year was £120.334m.  During 2023/2024 no long term
borrowing was taken. 
6.2. The Council had a borrowing requirement of £222.676m for 2023/2024, including
£166.307m carried over from previous years. 
6.3. The report to South Lanarkshire Council on Service Concessions in January 2023
introduced a strategy that recognised the level of reserves and cash balances held
by the council to reduce the need to borrow for this funding requirement.  After taking
these into account, the council had an expected borrowing requirement of
£306.273m for 2023/24. 
6.4. During 2023/2024, the Council placed £1,599.249 of deposits on a cumulative basis. 
All deposits made by the Council were in line with approved lending limits and credit
rating criteria.  The level of investment return was £10.202m.  Further details on
deposits are included in the annual investment report within this Committee paper.
7. Risk Management
7.1. The Council has complied with all of the relevant statutory and regulatory
requirements which limit the levels of risk associated with its treasury management
activities.  In particular, its adoption and implementation of both the Prudential Code
and the CIPFA Treasury Management Code of Practice means both that its capital
expenditure is prudent, affordable and sustainable, and its treasury practices
demonstrate a low risk approach. 
7.2. Investment Risk 
The main consideration when investing surplus funds is the security of the
transaction.  Through adoption on the CIPFA Code of Practice and through the
Councils Annual Investment Strategy the Council mitigates risks associated with all
our permitted investments. 
7.3. Interest Rate Risk
The Council’s capital programme is funded in part by borrowing.  Consideration has
always been given to the optimum time to borrow funds to ensure cash flow is
maintained, that any risks of increasing borrowing interest rates are minimised and
that takes into account the level of cash balances available to the Council. 
8. Treasury Management and Prudential Indicators
8.1. The Treasury Management and Prudential Indicators are detailed in Appendix 2 to
this report.
77

Page 78

Appendix 2
Treasury Management and Prudential Indicators 2023/2024 
1. Treasury Management Indicators 2023/2024
1.1. The Treasury Management Code includes Treasury Management Indicators which
are to be reported alongside the Treasury Strategy.
1.2. The purpose of these is to contain the activity of the treasury function within certain
limits, thereby managing risk and reducing the impact of an adverse movement in
interest rates.  The indicators are detailed below. 
2. Maturity Structure of Borrowing
2.1. By setting limits on the maturity structure of borrowing, the exposure to large
concentrations of fixed rate debt needing to be replaced at the same time in the
future at currently unknown rates can be limited.  This effectively places a limit on
exposure to longer term interest rate movement. 
Maturity Structure of Borrowing 
Upper
Limit
Lower
Limit
Maximum
for period
to 31/03/24
Actuals as
at 31/03/24
Under 12 months 30% 0% 2.10% 0.00%
12 months and 24 months 30% 0% 3.33% 3.33%
24 months and 5 years 50% 0% 25.66% 25.66%
5 years and 10 years 60% 0% 33.13% 33.13%
10 years and 20 years 60% 0% 4.29% 4.29%
20 years and 30 years 70% 0% 11.35% 11.35%
30 years and 40 years 80% 0% 22.24% 22.24%
40 years and 50 years 90% 0% 0.00% 0.00%
50 years and above 90% 0% 0.00% 0.00% 
3. Total Principal Sums Invested for Greater Than 364 days
3.1. The investment regulations introduced by the Scottish Government allowed the
Council to invest for periods in excess of 364 days.  The Treasury Management
Code requires local authorities to set an upper limit for each forward financial year
period for investments longer than 364 days.  The purpose is to contain the exposure
to the possibility of loss that might arise as a result of having to seek early repayment
of principal sums invested. 
3.2. South Lanarkshire Council set a limit restricting investments for periods in excess of
364 days to no more than £10m and for no more than 5 years. 
3.3. No investment was made during 2023/2024 for a period in excess of 364 days. 
4. Statutory Repayment of Loans Fund Advances
4.1. The Scottish Government introduced The Local Authority (Capital Financing and
Accounting) Scotland Regulations 2016 with effect from 1 April 2016.  These
regulations require the statutory loans fund to be administered in accordance with
the 2016 Regulations, proper accounting practice and prudent financial
management.
78

Page 79

4.2. The Council’s capital programmes are partly funded by planned borrowing which is
advanced from the Council’s Loans Fund.  Repayment of these advances is made
each year and forms part of the Council’s revenue expenditure.  Borrowing to fund
the capital programmes therefore creates a liability to repay those advances from
future years’ budgets.  The Council is required to report on the commitment to repay
loans fund advances. 
4.3. The General Fund had an opening balance of £843.397m advances from the Loans
Fund.  During 2023/2024 new advances of £18.919m were made to part fund the
Capital Programme, while repayments of £3.268m were made from the Council’s
revenue expenditure.  This left a closing balance of £859.048m to be repaid over the
next 50 years. 
4.4. The HRA had an opening balance of £292.693m advances from the Loans Fund. 
During 2023/2024 new advances of £14.516m were made to part fund the HRA
Capital Programme, while repayments of £0.005m were made from the HRA.  This
left a closing balance of £307.204m to be repaid over the next 40 years. 
4.5. The tables below show the repayment profile of the outstanding loans fund advances
for both General Fund and HRA as at 31 March 2024.  The tables do not include any
planned borrowing that may be taken in future years to fund the ongoing capital
programmes. 
General Fund
Opening
Balance
New
Advances  Repayments
Closing
Balance
2023/24 843.397 18.919 -3.268 859.048
2024/25 859.048 0.000 -3.730 855.318
2025/26 – 2028/29 855.318 0.000 -31.151 824.167
2029/30 – 2033/34 824.167 0.000 -41.439 782.728
2034/35 – 2038/39 782.728 0.000 -73.732 708.996
2039/40 – 2043/44 708.996 0.000 -100.508 608.488
2044/45 – 2048/49 608.488 0.000 -128.277 480.211
2049/50 – 2053/54 480.211 0.000 -163.718 316.493
2054/55 – 2058/59 316.493 0.000 -172.602 143.891
2059/60 – 2063/64 143.891 0.000 -107.295 36.596
2064/65 – 2068/69 36.596 0.000 -29.391 7.205
2069/70 – 2073/74 7.205 0.000 -7.205 0.000 
Housing Revenue
Account
Opening
Balance
New
Advances  Repayments
Closing
Balance
2023/24 292.693 14.516 -0.005 307.204
2024/25 307.204 0 -0.005 307.199
2025/26 – 2028/29 307.199 0 -33.646 273.553
2029/30 – 2033/34 273.553 0 -51.281 222.272
2034/35 – 2038/39 222.272 0 -49.027 173.245
2039/40 – 2043/44 173.245 0 -42.395 130.85
2044/45 – 2048/49 130.85 0 -45.892 84.958
2049/50 – 2053/54 84.958 0 -41.469 43.489
2054/55 – 2058/59 43.489 0 -28.421 15.068
2059/60 – 2063/64 15.068 0 -15.068 0.000
79

Page 80

4.6. The Council’s strategy for managing debt includes the early repayment of some
loans within the Loans Fund.  These repayments result in reduced principal and
interest payments in future years and are necessary to keep loan charges affordable. 
5. Prudential Code Indicators 2023/2024
5.1. The Prudential Code enables Councils to take responsibility for deciding an
affordable level of borrowing to fund capital expenditure.  This moves away from the
previous regime through which central government gave Councils consent to borrow
defined amounts for capital expenditure. 
5.2. To meet the objectives of the Code, the Council is required to report a number of
indicators, use those to demonstrate the affordability and sustainability of our capital
plans and to show that good treasury management practice is adhered to. 
6. Capital Expenditure and Borrowing Requirement indicators
6.1. Capital Expenditure
6.1.1 This indicator shows the capital expenditure for 2023/2024.  The 2023/2024 estimate
is also shown. 
Actual
£ m
Estimate
£ m
Variance
£ m 
General Fund Capital Expenditure  58.094  78.296  -20.202
Funded by:   
Borrowing 18.919 30.106 -11.187
Capital receipts and grants 38.599 46.730 -8.131
Revenue contributions 0.576 1.460 -0.884
Total Funding 58.094 78.296 -20.202 
HRA Capital Expenditure  62.240  67.443  -5.203
Funded by:   
Borrowing 14.516 23.166 -8.650
Capital receipts and grants 27.678 17.115 10.563
Revenue contributions 20.046 27.162 -7.116
Total Funding 62.240 67.443 -5.203 
6.1.2. The General Fund Capital Expenditure for 2023/2024 was £58.094m which is
£20.202m less than estimated in the Prudential Indicators, Treasury Management
Strategy and Annual Investment Strategy report presented to South Lanarkshire
Council in February 2024.  The details of this have been reported to the Executive
Committee over recent months, with a final position being reported on 26 June 2024. 
6.1.3. The Housing Revenue Account Capital Expenditure in 2023/2024 was £62.240m
which is £5.203m less than the estimate reported to South Lanarkshire Council in
February 2024.  The details of this have been reported to the Executive Committee
over recent months, with a final position being reported on 26 June 2024. 
6.2. Councils Borrowing Requirement (the Capital Financing Requirement)
6.2.1. The Council’s Capital Financing Requirement (CFR) is the total outstanding capital
expenditure which has not yet been paid for from either revenue or capital resources. 
It is essentially a measure of the Council’s requirement to borrow for past and
present capital expenditure and is comparable to the actual borrowing taken and
finance lease liability. 
80

Page 81

6.2.2. The Council is required to pay off an element of the accumulated balance of
borrowing every year through a charge to the revenue account. 
6.2.3. Over the medium-term borrowing should only be for a capital purpose.  Gross
borrowing should not, except in the short term, exceed the CFR for 2023/2024 plus
any additional capital financing requirement over 2024/2025 and the following two
financial years. 
6.2.4. The table below demonstrates that the Council has complied with this requirement. 
The Capital Financing Requirement for the General Fund is £11.186m lower than
forecast and for HRA is £8.655m lower than forecast.  For both the General Fund
and HRA, this is due to changes in the borrowing required to fund the capital
programmes reflecting the timing of expenditure and movements in other sources of
funding. 
31 March
2024
Actual
£ m
31 March
2024
Estimate
£ m
Variance
General Fund Capital Financing
Requirement 1,102.027 1,113.213 -11.186
HRA Capital Financing Requirement 307.217 315.872 -8.655 
Total Capital Financing Requirement 1,409.244 1,429.085 -19.841    
Treasury Position as at 31 March 2024   
Borrowing 1,034.532 1,014.531 20.001
PPP Finance Lease Liability 172.036 172.036 0.000
Gross Debt 1,206.568 1,186.567 20.001 
6.2.5. The Council’s gross borrowing position for 2023/2024 was £1,206.568.  This consists
of external borrowing of £1,034.532m and the PPP Finance Lease Liability of
£172.036m.  Gross borrowing is less than the capital financing requirement of
£1,409.244m due to the fact that no long-term borrowing was taken during
2023/2024. 
6.2.6. The Council used the significant cash balances it had available in lieu of the
remainder of its borrowing requirement.  Borrowing before cash was required would
incur a cost of carry as the interest rates achievable on deposits continue to be less
than the interest rates on borrowing. 
6.2.7. By not taking any long term borrowing during 2023/2024, interest costs for
2023/2024 were reduced and savings from this used to support the Revenue Budget
Strategy going forward. 
6.3. Limits to Borrowing Activity
6.3.1. The Operational Boundary for external debt is based on the expected maximum
external debt that could be faced in the course of the year.  It is set to accommodate
the borrowing requirements, and also includes sufficient scope to allow for changes
to the capital programme throughout the year.  This limit may be breached during the
year, and this would be reported in this Prudential report presented to Committee. 
6.3.2. The Authorised Limit for External Debt represents a limit beyond which external
debt is prohibited.  It represents the level of external debt which could be afforded in
the very short-term, but is not sustainable in the longer term without consideration to
81

Page 82

revenue budgets.  This limit would not be breached without the Finance and
Corporate Resources Committee being advised. 
2023/2024
£ m
Operational Limit for External Debt 1,250.000
Authorised Limit for External Debt 1,270.000
Maximum Borrowing Position During the Period 1,036.302
Operational Limit for Other Liabilities (PPP/Finance Lease) 180.000
Authorised Limit for Other Liabilities (PPP/Finance Lease) 180.000
Maximum PPP/Finance Lease Liability 179.133 
6.3.3. The table demonstrates that during 2023/2024 the Council maintained its borrowing
and other liabilities within their Authorised Limits and Operational Boundaries. 
7. Affordability Indicators
7.1. Ratio of Financing Costs to Net Revenue Stream
7.1.1. This indicator focuses on the extent to which the Council’s net revenue budget is
used for servicing debt.  This is shown for both General Fund and HRA.   
2023/24
Actual
£ m
2023/24
Estimate
£ m
General Fund Ratio of Financing Costs to
Net Revenue Stream (expressed as %) 4.47% 4.96%
HRA General Fund Ratio of Financing Costs
to Net Revenue Stream (expressed as %) 13.98% 17.16% 
7.1.2. For the General Fund, the ratio is less than forecast due to lower borrowing costs
and the Net Revenue Stream being higher than forecast. 
7.1.3. For the HRA, the ratio is also lower than forecast due to actual borrowing costs being
lower than forecast and a slight increase in income. 
82

Page 83

Appendix 3 
Annual Investment Report 
1. Permitted Investments
1.1. During 2023/2024 South Lanarkshire Council only used the following permitted
investments 
 Deposits with the Debt Management Account Deposit Facility
 Deposits with UK Local Authorities
 Deposits with Banks and Building Societies 
1.2. Deposits made in the period 1 April 2023 to 31 March 2024 totalled £1,599.249m. 
This is broken down per sector and institution in the table below.  81.47% of these
deposits were made in the UK Government through the Debt Management Account
Deposit Facility (DMADF). 
Counterparty
Deposit
Totals (£m)
% of
Total
Deposits
Average
Interest
Rate
Deposits in UK Government   
Debt Management Account Deposit
Facility 1,302.920 81.47% 4.93%
Total Deposits in UK Government 1,302.920 81.47% 4.93%    
Deposits in UK Local Authorities 248.300 15.53% 5.43%    
Deposits in UK Banks and Building
Societies   
Bank of Scotland 45.729 2.86% 4.68%
Royal Bank of Scotland 2.300 0.14% 1.00%
Total Deposits in UK Banks 48.029 3.00% 4.50%
Total Deposits 01/04/2023 to 31/03/2024 1,599.249 100.00% 4.99% 
1.3. The average interest rates achieved from the deposits are shown in the table above. 
Interest rates achievable for deposits have been increasing, however there is still a
differential between these and the rates at which the Council can borrow. 
1.4. Actual deposits as at 31 March 2024 totalled £13.475m. 
2. Risk Management
2.1. The following minimum thresholds were set in the strategy for all deposits with banks
and building societies, including Certificate of Deposits. 
Rating Agency Long Term
Rating
Maximum Deposit
Fitch A- £20m
Moody’s A3 £20m
Standard and Poors A- £20m
83

Page 84

2.2. Prior to depositing funds with any bank or building society, checks are made with the
Council’s treasury adviser, Link Asset Services, that the institution is considered safe
and that any deposit conforms to their recommended time duration as determined by
their Rating Methodology.  This methodology uses credit ratings, rating watches and
outlooks and credit default swap (CDS) prices to establish a suggested time duration
for deposits. 
2.3. The tables below show a breakdown of deposits with details of the credit ratings of
banks and building societies used from 1 April 2023 to 31 March 2024.  Deposits
with the DMADF are with the UK Government and so have a very high credit rating. 
Deposits with local authorities are considered to be of very high credit quality despite
most local authorities not having formal credit ratings. 
Fitch Ratings 
Long Term
Rating
Short Term Rating Deposits Totals Percentage of
Total Deposits
Deposits with DMO/UK Government (AA-) 1,302.920m 81.47%
Deposits with Local Authorities 248.300m 15.53%
A+ F1 48.029m 3.00%
Total  1,599.249m 100.00% 
Moody’s Ratings 
Long Term
Rating
Short Term Rating Deposits Totals Percentage of
Total Deposits
Deposits with DMO / UK Government (Aa3) 1,302.920m 81.47%
Deposits with Local Authorities 248.300m 15.53%
A1 P-1 48.029m 3.00%
Total  1,599.249m 100.00% 
Standard and Poor’s Ratings 
Long Term
Rating
Short Term Rating Deposits Totals Percentage of
Total Deposits
Deposits with DMO / UK Government (AA) 1,302.920m 81.47%
Deposits with Local Authorities 248.300m 15.53%
A+ A-1 45.729m 2.86%
A A-1 2.300m 0.14%
Total  1,599.249m 100.00% 
2.4. The tables show that 97.00% of deposits were made with counterparties of very high
credit quality (UK Government - DMADF and other local authorities).  All deposits
made by the Council were in line with approved lending limits and credit rating
criteria. 
2.5. In order to manage liquidity risk the Council held an average of £5.215m in bank
accounts with instant access. 
2.6. No deposits were placed for periods in excess of 364 days.
84

Page 85

3. Borrowing in Advance
3.1. No borrowing in advance was taken during 2023/2024.
85

Page 86

Appendix 4 
Investment Treasury Risks Mitigating Controls Limits
Deposits with the Debt
Management Account
Deposit Facility
This is a deposit with
the UK Government
and so credit risk is
very low. 
Liquidity risk has to be
considered as deposits
can only be broken
with the agreement of
the counterparty and
penalties may apply. 
There is no market risk
as the principal sum
invested is not affected
by market prices.
There are no mitigating
controls required. 
There is no maximum
monetary limit. 
A maximum term of
deposit of six months
as set by the Debt
Management Office.
Deposits with UK
Local Authorities and
other bodies defined
as local authorities in
the Local Government
Scotland Act 2003
(And Equivalent
English Act)
These are considered
to be quasi UK
Government
investment and as
such credit risk is very
low. 
Liquidity risk has to be
considered as deposits
can only be broken
with the agreement of
the counterparty and
penalties may apply. 
There is no market risk
as the principal sum
invested is not affected
by market prices.
There are no mitigating
controls required. 
The maximum deposit
with any local
authority will be £20m
for deposits less than
one year. 
Deposits in excess of
one year will be
subject to a maximum
term of deposit of
three years and be
limited to £10m.
Deposits with Banks
and Building Societies
These tend to be low
risk but credit risk will
be higher than
deposits placed with
the DMO or UK local
authorities. 
Liquidity risk has to be
considered as deposits
can only be broken
with the agreement of
the counterparty and
penalties may apply. 
There is no market risk
as the principal sum
invested is not affected
by market prices. 
The counterparty
selection criteria
restricts lending only to
high quality
counterparties,
measured initially by
credit ratings from Fitch,
Moody’s and Standard
and Poors. 
Additional indicators of
creditworthiness will
also be considered prior
to placing any deposits. 
Liquidity risk can be
controlled by the use of
instant access call
accounts. 
The maximum deposit
with any bank or
building society will be
£20m. 
A maximum term of
deposit of 364 days.
86

Page 87

Investment Treasury Risks Mitigating Controls Limits
Certificates of Deposit
with Banks and
Building Societies
These are short to
medium term dated
marketable securities
issued by financial
institutions. 
These tend to be low
risk investments but
credit risk will be
higher than deposits
placed with the DMO
or UK local authorities. 
Liquidity risk is lower
than placing a deposit
with a Bank or Building
Society as these can
be sold on the market. 
There is a risk of
capital loss arising
from selling ahead of
maturity.
The counterparty
selection criteria
restricts lending only to
high quality
counterparties,
measured initially by
credit ratings from Fitch,
Moody’s and Standard
and Poor’s. 
Additional indicators of
creditworthiness will
also be considered prior
to using this type of
instrument. 
Market risk would be
mitigated by holding the
instrument to maturity.
The maximum
investment with any
bank or building
society will be £20m. 
A maximum period of
investment of 364
days.
UK Government Gilts
and Treasury Bills
These are marketable
securities issued by
the UK Government
and as such credit risk
is very low. 
Liquidity risk is very
low as there is a huge
market for Gilts and
Treasury Bills 
There is a risk of
capital loss arising
from selling ahead of
maturity.
There are no mitigating
controls required for
credit risk as the
investment is with the
UK Government. 
Market risk would be
mitigated by holding the
instrument to maturity.
There is no maximum
limit to investments in
UK Gilts or Treasury
Bills for maturities less
than one year and a
limit of £10m for
maturities greater than
one year. 
The maximum period
of investment will be
five years.
AAA Rated Bonds
Issued by Multilateral
Development Banks
These are bonds
issued by
supranational bodies
such as the European
Investment Bank or
World Bank and as a
result are backed by
several sovereign
states and as such
credit risk is very low. 
Liquidity risk is very
low as there is a large
market for
Supranational Bonds. 
There is a risk of
capital loss arising
from selling ahead of
maturity.
As the investment is
effectively spread
across a number of
sovereign states, the
Council will mitigate the
credit risk of holding
such bonds by
considering the
sovereign rating of the
underlying sovereign
states and only holding
bonds that have a AAA
rating. 
Market risk would be
mitigated by holding the
instrument to maturity.
The maximum amount
that will be invested in
AAA Rated Bonds
issued by Multilateral
Development Banks is
£10m. 
The maximum period
of investment will be
five years.
87

Page 88

Investment Treasury Risks Mitigating Controls Limits
AAA Rated Money
Market Funds
Money market funds
are pooled funds that
invest in short-term
money market
instruments and other
debt instruments. 
The underlying
investments are
diversified and Credit
risk, liquidity risk and
market risk are all very
low. 
Investments in these
MMFs are highly liquid
(same day liquidity).
Money Market Funds
will only be used where
they have obtained a
AAA rating from the
credit rating agencies. 
In addition to the credit
rating, Money Market
Funds will also be
assessed for suitability
on fund size, the
strength of the
custodian and the
stability of invested
capital.
Investments in Money
Market Funds will be
limited to 0.5% of the
Money Market Fund
Balance and to no
more than £10m in
any one Fund. 
Investments in
Sterling Government
Money Market Funds
which only invest in
Sterling denominated
short term debt
securities issued by
the UK Government
will be restricted to 2%
of the Money Market
Fund size and to no
more than £10m in
any individual Money
Market Fund. 
Loans to Third Parties These are service
investments which
may exhibit credit risk
and are likely to be
highly illiquid.
Any new types of loans
to third parties should
be approved by
Members through the
appropriate Committee
with full consideration of
the service rationale
behind the loan and the
likelihood of partial or
full default and the
impact that this will have
on service budgets. 
88

Page 89

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Scottish Public Pensions Agency Consultation on the
Scottish Teachers’ Pension Scheme 
1. Purpose of Report
1.1. The purpose of this report is to:-
 provide an update on the Scottish Public Pensions Agency Consultation (SPPA)
on the Scottish Teachers Pension Scheme (STPS)
 provide an update on the Council’s response on the proposals to prospectively
amend the eligibility criteria for membership of the STPS with the aim of providing
clarity on who can be a member of the scheme 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the content of the report and the consultation responses on the topics
referred to in section 4.2 of the report and the consultation response detailed
at Appendix 1 be noted;
(2) that the proposed response, as detailed in Appendix 1, be approved for
submission to the SPPA by 15 November 2024; and
(3) that this report is remitted to the Education Resources Committee for noting. 
3. Background 
3.1. The Scottish Teachers’ Pension Scheme (STPS) continues to be an integral part of
the remuneration package for teachers in Scotland.  The Scheme offers the security
of a guaranteed income in every year of retirement for all its members, on some of
the most generous terms available from a pension scheme. 
3.2. Membership of the scheme is provided for individuals who are employed by a
participating employer, predominantly in a teaching role, and where they are
between the ages of 16 and 75.  Participating employers in the STPS include Local
Authorities, Colleges, Universities, Independent and Special Schools. 
3.3. The STPS regulations do not expressly define what a ‘teaching role’ is, however,
traditionally it is expected to be frontline teaching and for timetabled classes or
lectures to take up most of the role the individual performs. 
3.4. There are circumstances where other individuals may be eligible for membership of
the Scheme, without necessarily being directly engaged in a teaching role.  In the
legacy Scottish Teachers’ Superannuation Scheme (STSS) individuals were
previously described as ‘organisers’ and ‘advisers’.  The legacy STSS closed to
active members on1 April 2022, however the STPS does not include the term
‘adviser’.  This has led to uncertainty about who can be a member of the scheme. 
9
89

Page 90

3.5. Whilst scheme eligibility is clear for the majority of scheme members there are a
number of areas where clarity is required and others which could usefully be updated
to make them relevant to the present-day education system.  For example, currently,
Executive Directors, Heads of Service, Chief Officers, Quality Improvement
Managers, Music Instructors, who may have been in the STPS, must join the local
government pension scheme when they change roles.  It is primarily those working in
a non-school environment, that are affected. 
3.6. This consultation document seeks views on proposals to prospectively amend the
eligibility criteria for membership of the STPS with the aim of providing clarity on who
can be a member of the scheme.  This consultation will run for a period of 12 weeks
commencing on 23 August 2024 and ending on 15 November 2024. 
4. Proposed South Lanarkshire Council Response
4.1. In preparing the response to the consultation, views were sought from across
Personnel Services and Education Resources. 
4.2. The Council’s full proposed response to each aspect of the consultation, is detailed
in Appendix 1 and covers the key areas detailed below:- 
 eligibility for the scheme for all posts detailed in the Scottish Negotiating
Committee for Teachers (SNCT) handbook
 the extension of eligibility for those who move from a lecturing role (where they
are a member of the scheme) to a research role in Higher Education Institutions
and general scheme eligibility.
 to consider those on secondments for inclusion for STPS eligibility? 
 to consider senior manager posts connected to the management or supervision
of teachers for STPS eligibility? 
 do the proposed draft amending regulations deliver the policy objectives? 
 any other considerations or evidence that the Council think should be taken into
account when assessing any equality issues arising as a result of the proposed
changes 
5.  Next Steps
5.1. Subject to approval from the Finance and Corporate Resources Committee, the
response will be submitted to Scottish Government on 15 November 2024.
5.2. The SPPA have advised that the consultation will aim to inform amendments to the
scheme which will provide clarity on who can be a member of the scheme. 
6.  Employee implications
6.1. Employees will be able to retain their pension in the one scheme, should they move
roles within Education during their careers. 
7. Financial implications
7.1. There are no current financial implications associated with this report.
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environment implications arising from
this report. 
90

Page 91

9. Other Implications
9.1. There are no other implications arising from this report, however the Council have
sought clarity from the SPPA related to them specifically detailing named posts in
any amendments and if clarification or discussions have taken place or agreements
made with LGPS administrators on these changes. 
10. Equalities Impact Assessments and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, and therefore no impact assessment is required. 
10.2. The trade unions have been advised of this consultation and provided input into the
response. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 October 2024 
Links to Council Values/Priorities/Outcomes
 Excellent employer
 Accountable, effective, efficient and transparent
 Focused on people and their needs
 Working with and respecting others 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Michelle Milne – Head of Personnel Services (Finance and Corporate Resources)
Ext 4330 (Tel 01698 454330)
Email: michelle.milne@southlanarkshire.gov.uk 
91

Page 92

Appendix 1
South Lanarkshire Council full response to the SPPA consultation 
CONSULTATION RESPONSE FORM 
CONSULTATION on the Scottish Teachers’ Pension Scheme (STPS): Proposed
Changes to Membership Eligibility Criteria 
1. Name/Organisation
Organisation Name
South Lanarkshire Council
Title
HR Business Manager (Operations)
Surname
Lang
Forename
Danielle 
2. Postal Address
Council Offices
Almada Street 
Hamilton 
Postcode ML30AA Phone  01698 454132
Email Danielle.lang@southlanarkshire.gov.uk 
3. Permissions - I am responding as… (please complete either sections (a), (b) and (d) or
sections (c) and (d): 
Individual or Group/Organisation   
(a) Do you agree to your response being made
available to the public (in Scottish
Government library and/or on the
Scottish Government web site)?
Please state yes or no: Yes 
(c) The name and address of your organisation
will be made available to the public
(in the Scottish Government library
and/or on the Scottish Government
web site). 
(b) Where confidentiality is not requested, we will
make your responses available to
the public on the following basis  
Are you content for your response to be
made available? 
Please state yes to one of the following:    Please state yes or no: ……………                         
Yes, make my response, name and
address all available
..........      
or     
Yes, make my response available,
but not my name and
address
Yes      
or     
Yes, make my response and name
available, but not my
address
………           
(d) We will share your response internally with other Scottish Government policy teams who may be addressing the
issues you discuss. They may wish to contact you again in the future, but we require your permission to
do so. Are you content for Scottish Government to contact you again in relation to this consultation
exercise?  
Please state yes or no: ……Yes…………………………………. 
92

Page 93

ABOUT YOU 
I am responding … 
as a scheme member 
on behalf of an Independent School 
on behalf of an Employer Organisation 
on behalf of a Trade Union/Staff Association 
other (please specify) 
What is your gender?  
I am female 
I am male   
What is your working pattern? 
I work part-time  
I work full- time  
Not applicable 
93

Page 94

CONSULTATION COMMENTS 
Please use this space to provide any comments on the amendments. 
Question 1 - Do you agree or disagree with the proposal for all posts detailed in the SNCT
Handbook to be eligible for membership of the STPS?  If you disagree or don’t know how
to answer, please explain why. 
Comments: 
Yes, we agree that all posts detailed in the SNCT handbook should be eligible for 
membership of the STPS. 
Question 2 - Do you agree or disagree with the proposal to extend eligibility for those who
move from a lecturing role (where they are a member of the scheme) to a research role in
Higher Education Institutions (HEI)?  If you disagree or don’t know how to answer, please
explain why. 
Comments: 
Yes, we agree that the proposal should be extended to include lecturers moving to 
research roles. 
94

Page 95

Question 3 – Do you agree or disagree with the proposal to clarify that only Lecturers in
Further Education Institutions should be included for STPS eligibility?  If you disagree or
don’t know how to answer, please explain why. 
Comments: 
Yes, we agree with the proposal to clarify that only further education lecturers 
are eligible for STPS membership 
Question 4 – Do you agree or disagree with the proposal for secondments of up to four
years to be included for STPS eligibility?  If you disagree or don’t know how to answer, 
please explain why. 
Comments: 
Yes, we agree in principle that members should retain their STPS membership in
respect of secondments however are of the opinion that consideration should be 
given to a lesser duration for the reason stated below. 
Many employers will not approve a secondment in excess of 23 months as there is a
risk of establishing permanency in the seconded role and the employee having the
same redundancy rights as a permanent employee.  (This point was raised previously
by SPDS in their 2017 paper to the scheme advisory board) 
95

Page 96

Question 5 – Do you agree or disagree with the proposal for senior manager posts
connected to the control or supervision of teachers to be included for STPS eligibility?  
If you disagree or don’t know how to answer, please explain why. 
Comments: 
Yes, we agree in principle with this proposal, however we are of the opinion that
further clarity is required to confirm and refine the criteria mentioned in the 
consultation “for senior manager posts connected to the control or supervision of 
teachers”.   
For example, we are of the opinion that a defining list of job types/titles would assist
with this intention such as Executive Directors, Heads of Service, Chief Officer,
Quality Improvement Managers working in a non-school environment.  This would
ensure clarity and remove the risk of disparate employee groups becoming members
of the STPS based on ad-hoc connections with managing employees within an 
education setting. 
A further point which requires clarity is around GTC registered Music Instructors,
many of whom are currently members of the Local Government Pension Scheme.  
Further detail is required on this group, for instance, will they have the choice to enter
either scheme?  Or will it be mandatory that current LGPS members are required to
transfer into the STPS based on the outcome of this consultation? 
Question 6 – Do you agree or disagree that the proposed draft amending regulations 
Deliver the policy objectives?  If you disagree or don’t know how to answer, please 
explain why. 
Comments:
We believe that the proposals go some way to delivering the policy objective however
further clarity is required in respect of members who will be allowed to remain in
STPS until they leave their current role, and we would assume that this would mean
up to retirement if appropriate (mainly music instructors and quality improvement 
managers). 
Clarification is required on what discussions have taken place or agreements made
with LGPS administrators on this point. 
96

Page 97

Question 7 - Are there any other considerations or evidence that you think should be 
taken into account when assessing any equality issues arising as a result of the 
proposed changes? 
Comments:
The proposals will not immediately impact those in roles which may not be eligible
post implementation of the changes.  However, upon leaving their current role,
employees may be ineligible to remain in the scheme.  As an example, a music
instructor who is not GTC registered may face ejection from the scheme, whether they
move roles or not.  These roles have been the subject of much confusion over the
years with the majority enrolled in the LGPS (due to changes in teachers’ scheme)
and others in STSS, now STPS. 
Clarification as to any action to ‘move’ instructors into the ‘correct scheme’ would be
useful especially given the majority are currently in the LGPS. 
Consideration could be given to extending the eligibility to include all music instructors
as connected to teaching, whether GTC registered or not.  There will be
circumstances where a self-employed music instructor has become eligible for
permanency and thus requires to be employed and enrolled in a suitable scheme.  If
they have been enrolled in STPS, confirmation is required on how this would be
treated in the future. 
Please e-mail your response to SPPAPolicyConsultationResponses@gov.scot 
or send via mail to: 
STPS: Scheme Eligibility Consultation
SPPA Policy
7 Tweedside Park
Tweedbank
Galashiels
TD1 3TE 
The closing date for receipt of comments is 15 November 2024. 
97

Page 98

98

Page 99

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Collection and Approval for Write Offs 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise Committee of Revenue Collection performance for financial year
2024/2025 to 30 September 2024
 advise Committee of the position regarding the Non-Domestic Rates
Incentivisation Scheme (NDRIS) for financial year 2024/2025 
 seek approval for write offs 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that performance in the collection of revenue be noted;
(2)  that the current position in respect of NDRIS be noted; and
(3) that write offs for the following be approved:-
 Council Tax  £1,578,812.29
 Non-Domestic Rates £481,405.04
 BID Levy £2,859.91
 Sundry Debt  £26,631.90
 Housing Rent and associated charges £1,281,346.90  
3. Background
3.1. Responsibility for the collection of Council Tax, Non-Domestic Rates (NDR) and
Sundry Debt is the responsibility of Finance and Corporate Resources.  This report
and the attached appendix provide information on collection performance and
proposals for write off. 
4. Current Collection Performance
4.1. The first table in Appendix 1 presents the collection performance for Council Tax,
NDR and Sundry Debts for financial year 2024/2025. 
4.2. The annual Council Tax collection target for 2024/2025 has been set at 95.5%. 
Council Tax collection is currently 60.19%, ahead of target by 0.06% and ahead of
comparable performance in 2023/2024 by 0.07%. 
4.3. Council Tax performance is reported nationally on a line by line basis, which adjusts
for the impact of Scottish Water billing and collection.  For information, the equivalent
level of Council Tax collection at 30 September 2024 when Scottish Water debts are
removed is 60.51%. 
10
99

Page 100

4.4. A Non-Domestic Rates (NDR) collection target of 97.5% has been set for 2024/2025.
NDR collection is currently 48.7%, equal to target and behind comparable
performance in 2023/2024 by 0.2%. 
4.5. The 2024/2025 annual target for Sundry Debt collection has been set at 97.5%. 
Sundry Debt collection to 30 September 2024 was 97.5%, equal to target and ahead
of comparable performance in 2023/2024 by 0.2%. 
5. Arrears Collection Performance
5.1. Arrears collection performance for Council Tax, Non-Domestic Rates and Sundry
Debt is presented in the second table of Appendix 1. 
5.2. The 2024/2025 arrears annual target for Council Tax has been set at £3.000 million,
with collection to 30 September 2024 of £2.214 million, ahead of target by
£0.293 million (9.8%) and ahead of comparable performance in 2023/2024 by
£0.526 million. 
5.3. The 2024/2025 arrears target for Non-Domestic Rates has been set at £2.000
million, with collection to 30 September 2024 of £2.938 million, ahead of target by
£1.085 million (54.2%) and ahead of comparable performance in 2023/2024 by
£1.131 million. 
5.4. The 2024/2025 arrears target for Sundry Debt has been set at £10.153 million, with
collection to 30 September 2024 of £6.051 million, behind target by 5.0% but behind
comparable performance in 2023/2024 by 22.5%. 
6. Non-Domestic Rates Incentivisation Scheme
6.1. The Non-Domestic Rates Incentivisation Scheme (NDRIS), formally known as the
Business Rates Incentivisation Scheme is a Scottish Government initiative to
incentivise growth of the local business tax base, with a view to increasing non-
domestic rates income yields. 
6.2. The Scottish Government sets annual targets for growth (buoyancy) and Councils
who achieve their target retain 50% of the additional income generated above the
target.  The buoyancy target is a measure of the increase in the total rateable value
of the non-domestic properties on the Valuation Roll (including certain categories of
public undertakings). 
6.3. The provisional annual buoyancy target for South Lanarkshire Council in 2024/2025
has been set by the Scottish Government at 0.9%.  This is a measure of the increase
in the total rateable value of the non-domestic properties on the Valuation Roll
(including certain categories of public undertakings). 
6.4. Performance against the NDRIS target will be reported to Committee on a quarterly
basis.  Buoyancy to the end of September 2024, was 0.65%. 
6.5. The tax base must achieve further growth of more than 0.25% during the remaining
two quarters of the financial year to secure additional income under the scheme. 
7. Proposals for Write Off
7.1. Approval for write off of the following irrecoverable debts is requested from
Committee.  The Council has the power to write off accounts where the debtor is
deceased, sequestrated, in liquidation or the debt is prescribed or where the debt is
deemed uneconomical to pursue.  
100

Page 101

7.2. The proposed write off of Council Tax accounts dating from 1993/1994 to 2024/2025
totals £1,578,812.29, relating mainly to prescribed debt, sequestrations and estates
of the deceased.  This includes the bulk write off of prescribed debt for financial year
2000/2001. 
7.3. The value of accounts currently marked for write off in the Non-Domestic Rates
system from rating years 2022/2023 to 2024/2025 totals £481,405.04.  These debts
are deemed to be irrecoverable because the debtor is in liquidation, has ceased
trading or has been sequestrated. 
7.4. Approval is sought for the write off of Business Improvement District (BID) Levies
totalling £2,859.91, administered by the Council on behalf of the Hamilton, Carluke
and Lanark BID companies.  There is no financial impact on the Council for these
write offs. 
7.5. Following consultation and agreement with Resources, the proposed write off of
Sundry Debt totals £26,631.90.  Appendix 2 provides a breakdown of the proposed
write-off over categories. 
7.6. Approval is sought for the write off of former tenant rent arrears of £1,263,801.71
(including bulk write offs for financial years 2022/2023 and 2023/2024 for temporary
accommodation), factoring arrears of £751.22 and Housing Benefit Overpayments of
£16,793.97. 
7.7. A full list of all debts proposed for write off is held by the Executive Director (Finance
and Corporate Resources). 
8. Employee Implications
8.1. None. 
9. Financial Implications
9.1. Provision has been made for the financial impact of all write offs. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
11. Other Implications
11.1. The main risk associated with the Council’s revenue collection is a failure to monitor
collection rates and take effective corrective action where required, resulting in a
significant reduction in collection performance and Council funding.  The risk is
managed through monthly performance reporting and review of performance at
monthly Senior Management Meetings. 
11.2. There are no implications for sustainability in terms of the information contained in
this report. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. There is no requirement to carry out an impact assessment in terms of the proposals
within this report.  
101

Page 102

12.2. There is no requirement to undertake any consultation in relation to the content of
this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 September 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Finance and Corporate Resources Committee - 22 August 2024 
List of Background Papers
 System Reports from Council Tax, Non-Domestic Rates, Sundry Debt and Academy
Housing 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
102

Page 103

Appendix 1        
SOUTH LANARKSHIRE COUNCIL        
REVENUES COLLECTION        
FOR PERIOD ENDING 30 SEPTEMBER 2024         
Annual Budget           
Cash Target  Actual Variance   % Variance   
Budget to 30/09/24 to 30/09/24 to 30/09/24   to  Notes 
£000's £000's £000's £000's    annual budget          
FINANCIAL YEAR 2024/2025       
Council Tax 156,825 98,691  98,783  93 over 0.06% 
Non-Domestic Rates 387,069     193,336      193,241         (95) under 0.0% 
Sundry Debt 111,073  111,073  111,058  (15) under 0.0% 
ARREARS        
Council Tax 3,000  1,921 2,214 293 over  9.8% 
Non-Domestic Rates 2,000    1,853  2,938      1,085 over 54.2% 
Sundry Debt       10,153       6,559       6,051      (508)       under         -5.0% 
103

Page 104

Appendix 2 
BREAKDOWN OF PROPOSED
SUNDRY DEBT WRITE-OFF 
Resource Service No. of Accounts Value (£)
Housing & Technical Estates / Housing Support  20                 12,813.02
Social Work Alert Community Alarm Service                     141                   6,509.82
Community and Enterprise Care of Gardens / Roads 20                   5,129.17
Education  Education General  3                      938.80
Finance & Corporate Housing Benefit Overpayments  2    1,241.09 
Total 186  26,631.90 
104

Page 105

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Reserves Strategy 
1. Purpose of Report 
1.1. The purpose of the report is to:- 
 provide information on the Council’s Reserves Strategy, including their position as
at the end of 2023/2024, and information on their planned use across the coming
years 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the detail on the Reserves and their balance at the end of 2023/2024
(section 4), be noted; 
(2) that the Strategy proposed for each Reserve (section 5), be noted; and
(3) that the planned use of Reserves across the coming years (section 6, Appendix
1), be noted. 
3. Background
3.1. A report was presented to the Council’s Executive Committee on 26 June 2024
detailing the 2025/2026 to 2027/2028 Revenue Budget Strategy. 
3.2. Section 7 of the June 2024 Revenue Budget Strategy report to Executive Committee
(link above) noted that it is good practice to have a Reserves strategy.  Councils can
hold reserves for a number of reasons.  Some reserves are earmarked for identified
expenditure which will, or may occur, over the short, medium or longer term.  In
addition to these reserves, there are Uncommitted Reserves which help manage
unforeseen circumstances.   
3.3. Section 4 details the Council’s Reserves and their balance at the end of 2023/2024.
The Council’s Reserves, their purpose, and also a proposed strategy is provided at
section 5. 
4. Reserves and their Position at end 2023/2024
4.1. It is the responsibility of the Executive Director (Finance and Corporate Resources) to
advise the Council on the level of reserves it should hold and to ensure that there are
clear protocols for their establishment and use. 
11
105

Page 106

4.2. The Local Authority Accounting Panel (LAAP) provide guidance to the Council’s
Section 95 Officer (the Executive Director of Finance and Corporate Resources), on
the establishment and maintenance of local authority reserves and balances.  The
LAAP Bulletin 99 (Local Authority Balances and Reserves) does not prescribe a
minimum level of reserves which should be held by a council.  It is for the Council to
consider an appropriate level of reserves taking cognisance of strategic, operational
and financial risks facing the authority at a local level.  It does, however, say that
Reserves should not be held without a clear purpose.  Audit Scotland have noted that
the level of reserves that councils hold is a local decision.  Section 5 of this paper will
detail a Strategy for each of the Council’s Reserves. 
4.3. The Council has a number of earmarked/specific reserves and one General Fund. 
This General Fund is split into 2 with an element being earmarked/committed
(including that set aside for future budget strategies), and also an unearmarked
element.  Table 1 shows a summary of the Reserves position at the end of financial
year 2023/2024. 
Table 1 – Reserves Analysis 
£m £000
Total Usable Reserves  133.689
Less:  
General Fund (earmarked/committed inc. Budget Strategies) 96.731 
Repairs and Renewals  5.346 
Insurance Fund 0.195 
Capital Funds  5.153 
Housing Revenue Account 13.221 
Total Earmarked/Committed Usable Reserves  120.646
Uncommitted General Fund  13.043 
4.4. Table 1 shows the level of Unearmarked/Uncommitted General Fund at
£13.043 million at end financial year 2023/2024.  These monies are for use in an
emergency situation and are a cushion to contribute towards unanticipated pressures
that the Council may face in year.  The Council holds this to use in the event of
unforeseen circumstances and is not available for routine operational activities. 
4.5. Of this total Reserves balance, the Earmarked/Committed General Fund totals
£96.731 million and this includes £69.097 million identified for use in the Council’s
Revenue Budget Strategies.  The Council’s Financial Strategy across 2025/2026 to
2027/2028 is predicated on the utilisation of Reserves across a number of years,
with a view to managing the savings requirement in those years.  The Reserves
being used have either been:- 
 budget underspends previously earmarked for use in the Budget Strategy
 the result of underspends generated from the Loans Fund Review as approved in
June 2020 (final use in 2024/2025)
 reserves generated through the implementation of the Service Concession
arrangements approved in November 2022 (final year 2025/2026)
 or the underspend generated by the reduced pension contributions during
2024/2025 and 2025/2026 as agreed at Executive Committee, November 2023
(final year of use being 2026/2027)  
106

Page 107

4.6. The Other amounts within the overall total estimated Reserves at the end of 2023/2024
relate to specific Reserves such as the Housing Revenue Account, the Insurance Fund
and Capital Funds.  All other Reserves are held for specific purposes and the total
balance of Reserves currently held is considered an appropriate level in relation to the
Council’s financial position. 
5. Reserves Position and Strategy
5.1. The position on each Reserve is taken in turn along with the proposed Strategy for
each. 
5.2. General Fund:  Audit Scotland note that one of the key measures of the financial
health of a body is the level of reserves held.  The General Fund is the largest usable
reserve and is used to fund the delivery of services.  It provides a contingency fund
to meet unexpected expenditure and a working balance to help cushion the impact of
such expenditure. 
5.3. LAAP Bulletin 99 notes that a well-managed authority, for example, with a prudent
approach to budgeting should be able to operate with a level of general reserves
appropriate for the risks (both internal and external) to which it is exposed.  In
assessing the appropriate level of reserves (Unearmarked/Uncommitted and
Earmarked/Committed), a well-managed authority will ensure that the reserves are
not only adequate but are also necessary.  It also notes that there is a broad range
within which authorities might reasonably operate depending on their particular
circumstances. 
5.4. In terms of financial management and sustainability, the recent Audit Scotland report
for the Council noted that ‘While facing financial challenges through inflationary
pressures on pay and non-pay costs as well as demand on services, the Council
continues to demonstrate sound financial management maintaining general fund
reserves in line with the long-term Revenue Financial Strategy’.  They also note that
they are ‘satisfied that reserves are being regularly reviewed to confirm that they
remain at an appropriate level.  However, there are ongoing sustainability challenges
of using reserves to fund recurring expenditure.  Difficult decisions will need to be
taken in the future, with a clear plan and effective management of the Council’s
reserves key to maintaining financial sustainability’. 
5.5. The Council’s General Fund is split into 2 parts – Unearmarked/Uncommitted and
Earmarked/Committed.  Each is taken in turn along with the proposed plan to
managing each Reserve. 
5.6. Uncommitted General Fund:  As at 31 March 2024, the Council’s uncommitted
General Fund is £13.043 million.  As noted in section 4.4, these monies are for use
in an emergency situation and are a cushion to contribute towards unanticipated
pressures that the Council may face in year.  The Council holds this to use in the
event of unforeseen circumstances and is not available for routine operational
activities.  Against an expenditure budget of £955 million for 2024/2025, this
represents a 1.4% reserve.  
107

Page 108

5.7.  It is proposed that rather than suggesting that our Unearmarked/Uncommitted
General Fund Reserve should be higher, we continue to adopt the approach
suggested by the LAAP Guidance, and that a risk-based approach is applied.  This
would mean giving consideration to the level of the Unearmarked/Uncommitted
General Fund Reserve on an annual basis, reflecting the Council’s planning and
budget strategy position.  The Council does not rely on Reserves to fund Revenue
expenditure without a clear plan. 
5.8. Earmarked General Fund:  As at 31 March 2024, there are £96.731 million of
earmarked general funds.  Of this amount, £69.097 million has been earmarked for
use in the Council’s medium term Budget Strategy (section 4.5).  The remaining
£27.633 million is earmarked for specific purposes including Early Learning and
Childcare (£7.711 million) and multi-year Investments caried forward (£5.036 million). 
Other significant balances include multi-year project funding for employability (£3.499
million), Children and Family Pressures (£2.320 million), Homelessness (£1.575
million) and Ukraine Resettlement (£1.485 million).  Future additions to the Reserve
will be based on Resource requests to earmark funds and will be subject to Member
approval (either in the Probable Outturn or the year-end report to the Council’s
Executive Committee).  A review will take place annually to consider the monies held
in the Earmarked/Committed General Fund Reserve, alongside the Council’s
revenue Budget Strategy and assessment of expenditure and funding risk areas. 
5.9. Repairs and Renewals Fund:  This fund has been established mainly through
contributions from the revenue budget.  As at 31 March 2024 the balance on this
fund is £5.346 million.  Contained within the overall heading of Repairs and
Renewals is the Winter Maintenance Fund (£0.422 million at March 2024) and the
Strategic Waste Fund, a sum of money to assist in managing the impact of uneven
cash flows and contract cost increases in relation to the Council’s Waste
Collection/Disposal contracts (£2.991 million).  These funds have been set aside and
earmarked for specific purposes.  Any future additions would be based on Resource
requests for specific projects and will be subject to Member approval (either in the
Probable Outturn or the year-end report to the Council’s Executive Committee). 
5.10. Insurance Fund:  Council Resources contribute to the Insurance Fund.  The fund
meets the cost of premiums, paying uninsured excess settlements.  The uninsured
excesses on the Council’s main policies are significant meaning the vast majority of
losses are self-insured with the cost of losses being met from the self-insurance
fund, with insurers paying for costs above the excess on individual losses. 
5.11. As at 31 March 2024, the balance on this fund is £0.195 million.  The budget for
insurance annually should cover costs each year, however due to the timing of
claims and payments, the fund is used to manage the multiyear nature of spend and
to carry forward balances.  Further budget allocations have been made in future
years including in the 2025/2026 to 2027/2028 Budget Strategy. 
5.12. Capital Fund:  The money held within the Capital Fund may be used to fund
expenditure of a capital nature or to repay loan fund principal which allows flexibility
in the Revenue Budget.  At 31 March 2024 the balance on this fund is £5.153 million. 
Contained within the overall heading of the capital fund are specific funds including,
IT Development Fund (£1.289 million), Education Capital Replacement Fund (£2.035
million) and the Usable Capital Receipts (£1.178 million).  The Capital receipts are
specifically earmarked to fund the capital programme.  Any future additions to the IT
Development Fund would be based on Resource requests for specific projects and
will be subject to Member approval (either in the Probable Outturn or the year-end 
108

Page 109

report to the Council’s Executive Committee).  The Education Capital Replacement
Fund is subject to the Devolved School Management arrangement for schools (these
monies are specifically set aside by schools for specific spend items, from their
devolved budget). 
5.13. Housing Revenue Account Reserve:  the balance on this fund as at 31 March
2024 is £13.221 million.  These monies are ring fenced for the activities associated
with the Council’s Housing stock. 
6. Profiled Use of Reserves
6.1. Appendix 1 attached shows the Council’s Reserves at the end of 2023/2024, and a
profile of anticipated use across the coming years.  The main movements reflect the
use of Reserves in the Council’s Revenue Budget Strategy, relating to the use of
Reserves established following the implementation of the Service Concession
arrangements and from the reduced pension contributions (as part of the Revenue
Budget Strategy – Executive Committee, November 2023). 
6.2. The table in Appendix 1 shows that all Reserves are committed, except the
Unearmarked/Uncommitted General Fund Balance of £13.043 million. 
7. Employee Implications
7.1. There are no direct employee implications from this report. 
8. Financial Implications
8.1. The financial implications are summarised within the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9.2. Climate Change targets will have an impact on the Council’s future financial strategies. 
This will be included in future Budget Strategy papers as appropriate. 
10. Other Implications
10.1. The review of reserves is a key part of understanding the Council’s level of financial
resilience in light of the financial risks and challenges it faces. The financial strategy
is the way in which the Council can manage a number of these key risks which directly
impact on the money available to deliver Council outcomes.   
10.2. We will continue to monitor and report on the reserves as appropriate. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
11.2. There is no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
2 October 2024  
109

Page 110

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 24 June 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Jackie Taylor, Executive Director, Finance and Corporate Resources 
Ext:  4637 (Tel:  01698 454637)
E-mail : jackie.taylor@southlanarkshire.gov.uk 
110

Page 111

Appendix 1
Reserves and Their Estimated Use Across 2024/2025 to 2026/2027+ 
Balance at
end
2023/2024
Estimated
Use in
2024/2025
Estimated
Transfer to
Reserves in
2024/2025
Estimated
Balance at
end
2024/2025
Estimated
Use in
2025/2026
Estimated
Balance at
end
2025/2026
Estimated
Use in
2026/2027
and Beyond  
£m £m £m £m £m £m £m
Earmarked / Committed Usable Reserves              
General Fund 
(earmarked/committed inc. Budget Strategies) 96.731 (54.705) 23.290 65.316 (50.261) 15.055 (15.055)
Repairs and Renewals  5.346 (1.029) 0.000 4.317 (3.050) 1.267 (1.267)
Insurance Fund 0.195 0.000 0.000 0.195 0.000 0.195 (0.195) 
Capital Funds  5.153 (3.075) 0.000 2.078 (0.279) 1.799 (1.799) 
Housing Revenue Account 13.221 (2.382) 0.000 10.839 (4.035) 6.804 (6.804)  
Total Committed Usable Reserves 120.646 (61.191) 23.290 82.745 (57.625) 25.120 (25.120) 
Unearmarked / Uncommitted General Fund 13.043 0.000 0.000 13.043 0.000 13.043 0.000 
Total Reserves 133.689 (61.191) 23.290 95.788 (57.625) 38.163 (25.120) 
* Estimated use / transfers for 2024/2025 based on the Period 7 Monitoring reports and estimates for the remainder of the year.
111

Page 112

112

Page 113

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject:  Annual Procurement Report – 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Annual Procurement Report for 2023/2024
[1purpose]
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Annual Procurement Report for 2023/2024 be noted.
[1recs]
3. Background
3.1. The Procurement (Scotland) Reform Act 2014 requires contracting authorities to
prepare and publish an annual procurement report on its regulated procurement
activities. 
3.2. This report to Committee provides an overview of the annual report highlighting key
content from each of the sections.  The full annual report is provided as Appendix 1. 
4. Annual reporting requirements
4.1. The Act states that the annual report must include:- 
 Regulated procurement activity
 Procurement strategy
 Community Wealth Building and Community Benefits
 Sustainable Procurement and Supported Businesses
 Future planning
 Other information 
4.2. Section 2: Regulated Procurement Activity
4.2.1. Regulated procurement is defined by the Procurement Reform (Scotland) Act 2014
as any procurement with an estimated value of over £50,000 for supplies or services
or £2m for works contracts.  The Council includes all awards over £50,000 in the
Annual Report for transparency. 
4.2.2. The Council’s contract awards in 2023/2024, as detailed in Appendix 1 of the annual
report, totalled 196 contracts (over £50,000) with a total value of £315.8 million.  This
compares to 169 contracts for the same period in 2022/2023. 
12
113

Page 114

4.3. Section 3: Regulated Procurement Compliance 
4.3.1. This section sets out how procurements carried out demonstrated compliance with
the Council’s Procurement Strategy and Procurement regulations. 
4.3.2. The Procurement Strategy 2023 to 2028 was endorsed by FCR Committee on 3 May
2023 and approved by the Executive Committee on 17 May 2023.  The Strategy is
subject to annual review, including an action plan to ensure continuous improvement
across procurement activity and an update on the Procurement Strategy action plan
for 2023/2024 was reported to Finance and Corporate Resources Committee on 22
May 2024.  The Annual Report highlights actions completed during 2023/2024,
including improved levels of local spend, efficiencies delivered by the procured
spend review and implementation of Community Benefit monitoring software. 
4.3.3. The Annual Report also outlines the Council’s arrangements to ensure compliance,
transparency and Value for Money. 
4.4 Section 4: Community Wealth Building and Community Benefits 
4.4.1. This section of the annual report has been developed to focus on procurement
outcomes from the Community Wealth Building Strategy, including levels of local
spend.  Local spend improved from 18.0% in 2022/2023 to 19.5% in 2023/2024,
representing £67 million of spend with local enterprises. 
4.4.2. The Council’s approach to secure Community Benefits is outlined in the Annual
Report.  In 2023/2024, 240 Community Benefit commitments from 31 contracts are
detailed, and case studies of appropriate projects are included, including contracts
with Biffa and Lightways. 
4.5. Section 5: Sustainable Procurement and Supported Businesses
4.5.1. This section of the report provides an update on the Council’s progress in
embedding the Scottish Government’s sustainable procurement tools and examples
of sustainable outcomes.  Positive sustainable outcomes in procurement include
compliance with Fair Work First guidance, provision of guidance to Resources for
sustainability questions to support the mandated 30% sustainability score in tenders
and use of the sustainability test to embed sustainability measures in the Care at
Home contract. 
4.5.2. The Council’s responsibility to facilitate the involvement of supported businesses in
procurement is also outlined in this section.  Supported businesses are enterprises
whose main aim is to integrate disabled or disadvantaged people socially and
professionally.  Their workforce must be at least 30% disabled or disadvantaged, as
specified in EU Directive 2014/24/EU.  The Council’s contractual activity with
supported businesses and social enterprises is noted, including Haven Products,
Hey Girls and Scotland’s Bravest Manufacturing Company. 
4.6. Section 6: Future Planning
4.6.1. A summary of the regulated procurements the authority expects to award in the next
2 years, including renewals and new contracts, is included in Appendix 3 of the
report, which has been developed following procurement service planning
consultation with Resources. 
4.6.2. The procurement programme for 2024/2025 and 2025/2026 contains a significant
volume of projects, including high value construction, IT and economic development
projects and continuing phases of the various Education and Social Care long-term
Procured Service Arrangements.  
114

Page 115

4.7. Section 7: Further information
4.7.1. Information to be included in this section is not prescribed, however, the Council has
highlighted several areas, including local and SME spend analysis and payables and
e-invoicing performance information for 2023/2024. 
4.7.2. As referenced at 4.4.1, spend in the South Lanarkshire area (for all contractors,
including SMEs) increased to 19.5%, representing an increase of £4 million spent
locally in 2023/2024 to £67 million. 
4.7.3. A geographical analysis of spend is included in the annual procurement report and
quantifies spend for the wider Lanarkshire area (31%), Glasgow City Region (45%)
and across Scotland (68%): spend retained within Scotland having decreased
slightly from 70% in 2022/2023. 
4.7.4. The Procurement Service continue to work in partnership with the Economic
Development Service and the Supplier Development Programme to improve the
participation of local SMEs in Council contracts, an area of focus in the spend pillar
of the Council’s Community Wealth Building strategy. 
4.7.5. An analysis of the impact on local spend through collaborative arrangements is also
included in the annual report, noting that £6.7 million (14%) of South Lanarkshire
Council spend via Scotland Excel frameworks is with local enterprises, a decrease
from £7.6 million in 2022/2023.  In 2023/2024, £70 million of spend is directed to
South Lanarkshire companies from Scotland Excel in total (by all local authorities),
an increase from £62 million in 2022/2023. 
4.7.6. Council spend with Hub South West totalled £10.6 million, of which £2.8 million
(27%) was spent with South Lanarkshire based companies, with Hub South West’s
total sub-contracted spend in South Lanarkshire being £4.1 million, confirming the
wider economic benefits from collaboration 
4.7.7 The Annual Procurement Report 2023/2024 is attached as an Appendix for noting
and publication thereafter. 
5. Employee Implications
5.1. The forward programme presents a significant number of projects for delivery by the
Procurement Team, at a time when the recruitment of experienced procurement staff
continues to be extremely challenging.  The recruitment programme of procurement
graduates supports the capacity of the team. 
6. Financial Implications
6.1. The financial implications of procured spend is accounted for within Resource
budgets. 
7. Other Implications
7.1. Given the large volume of projects identified in the forward programme there is a risk
that some procurement activity may be affected due to resourcing challenges. 
Projects will therefore continue to be prioritised and assessed to minimise the risk of
disruption. 
115

Page 116

8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
9 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Annual Procurement Report 2022/2023, Finance and Corporate Resources Committee,
27 September 2023
 Procurement Strategy 2023 to 2028, Executive Committee, 17 May 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Craig Fergusson, Head of Finance (Transactions) 
Ext: 4951   (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
116

Page 117

Finance and Corporate Resources
Executive Director Jackie Taylor 
Annual Procurement Report 
2023/2024 
If you need this information in another language or format, please contact us to discuss how we can
best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk
12
117

Page 118

Contents   
1. Introduction 
2. Regulated Procurement Activity 
3. Regulated Procurement Compliance 
4. Community Wealth Building and Community Benefits 
5. Sustainable Procurement and Supported Business 
6. Future Regulated Procurements 
7. Further Information 
Appendix 1: Regulated Procurements
Appendix 2: Procurement Strategy Action Plan 
Appendix 3: Future Regulated Procurements 
118

Page 119

1. Introduction 
South Lanarkshire Council’s Procurement Service supports the delivery of works,
supplies and services across the Council and has a vital role in ensuring services
operate efficiently and effectively. 
The report details the Council’s regulated procurement activity for the period 1 April
2023 to 31 March 2024, as required by the Procurement Reform (Scotland) Act
2014.  During this period, the Council’s total procured spend was £385m. 
Our annual report will publish the Council’s performance in procurement activity by
providing the following information:
• a summary of regulated procurements, including all procurements over
£50,000.
• a review of whether those procurements complied with our published
Procurement Strategy and where they did not, a statement on how we intend
to achieve compliance.
• a review of Community Wealth Building activity and summary of Community
Benefits achieved.
• a summary of progress in facilitating the involvement of Supported
Businesses.
• a summary of future regulated procurement, including all procurements over
£50,000 expected to commence in the next two financial years. 
The Procurement Service continued to support Council services through challenging
financial conditions while continuing to focus on the seven objectives of the Council’s
Procurement Strategy:   
Compliance
Value for
Money 
Collaborate
Contract and
Supplier
Management 
Fair Work
First
Sustainable
and Ethical
Community
Wealth
Building
119

Page 120

2. Regulated Procurement Activity 
A regulated procurement is defined by the Procurement Reform (Scotland) Act 2014
as any procurement with an estimated value of over £50,000 for supplies or services
or over £2m for works contracts.  A regulated procurement is complete when the
contract award notice is published and can include new contracts and framework
agreements. 
In addition, regulated procurements will be subject to the Public Contracts (Scotland)
Regulations 2015 where they meet the appropriate thresholds.  The Council must
follow the relevant procurement rules in respect of planning through to contract
award, as detailed in Section 3: Regulated Procurement Compliance. 
In total, the Council awarded 196 contracts over £50,000 in 2023/2024, with a total
award value of £315.8m, as listed in Appendix 1.  This includes both regulated and
non-regulated contracts, with the Council publishing all awards over £50,000 in this
Annual Procurement Report for transparency. 
120

Page 121

3. Regulated Procurement Compliance 
The Procurement Reform (Scotland) Act 2014 requires all contracting authorities to
publish a Procurement Strategy. 
2023/2024 was the first year of our new Procurement Strategy 2023-2028, which
aims to promote best practice across all procurement activity, while supporting the
Council’s priorities set out in the strategic plan “Connect”.  The strategy is supported
by an Action Plan to ensure compliance for all procurement activity, including
regulated procurements, and is subject to annual review to reflect new legislative
requirements, innovation and updated priorities. 
A summary of the Council’s strategic procurement objectives is included in Appendix
2.  Progress in achieving our Procurement Strategy action plan is monitored by the
Council’s Corporate Management Team and Finance and Corporate Resources
Committee. 
Key achievements in 2023/2024 included:
• Completion of the Council’s two year Procured Spend Review project, with       
efficiencies of over £2m identified.
• Increased level of spend with local enterprises from 18% to 19.5% in 2023/2024,
representing £67m spent locally, of which £60m was with SMEs. 
• Delivery of payment of Living Wage in all Social Care contracts, uplifted in April
2023. 
• Implementation of the new Community Benefits monitoring software “Cenefits” for
council contracts. 
• Development of a new harmonised Scheme of Delegation for Standing Orders on
Contracts. 
Procurement Compliance and Transparency 
The Council’s procurement activity, including regulated procurements, is undertaken
in accordance with a legal and procedural framework to ensure compliance.  Legal
requirements are underpinned by the Council’s Standing Orders on Contracts and
procedural arrangements are as set out in the Scottish Government’s Procurement
Journey.   
Additional governance and monitoring arrangements for regulated procurements
ensure a robust structure is in place to ensure compliance.  At a practical level this
consists of the preparation and authorisation of sourcing strategies and tender
documentation through to robust arrangements for authorisation of awards.  To
maintain the highest standards of transparency, the Council’s Standing Orders on
Contracts mandate that all contract awards over £50,000 are reported to Committee,
with all reports available in the public domain.  The Council also maintains a publicly
accessible online contracts register with access to all contract awards of all values
and in 2023/2024 we updated the format of the register to ensure improved
transparency. 
The Council also has a scrutiny review structure in place to review tendering and
award arrangements for high-risk procurements.  These arrangements provide
121

Page 122

assurance that all regulated procurements were materially compliant with the
strategy. 
The Council monitors contractual compliance, with 97% of 2023/2024 spend over
£50,000 with contracted suppliers.  A quarterly review process is in place to identify
and resolve spend with non-contracted suppliers. 
Value for Money 
Value for Money in contractual arrangements is a key strategic objective of the
Procurement Service and a review of procured spend is one of the Council’s key
efficiency review areas led by the Corporate Management Team. 
The review set ambitious targets to review procured spend across all Council areas
and seek deliverable revenue efficiencies: either through review of existing
contractual arrangements or by putting new contracts or collaborative agreements in
place.  In the previous two-year period, total efficiencies of £2m have been identified. 
Oracle Fusion 
The Council’s new financial management system, Oracle Fusion, went live in April
2024 and this was a significant project for the Council’s Procure to Pay functions
during 2023/2024.  The new system will contribute to improved procurement
compliance through an integrated Contract Register with workflow authorisation for
contract awards, with awards linked to contract spend. 
122

Page 123

4. Community Wealth Building and Community Benefits 
Community Wealth Building
The Council’s Community Wealth Building Strategy was approved by the Council in
2021 and sets out five strategic pillars to develop resilient local economies.  The
“spend” pillar seeks to use the purchasing power of the Council and other local
anchor institutions to improve local spending and deliver positive impacts on
employment opportunities: the Procurement Service and our colleagues in Economic
Development are responsible for delivering the actions for this pillar. 
Key achievements for the Procurement Service in 2023/2024 included:
♦ £67m spent in the local economy, an increase from £63m in 2022/2023 and
improving spend levels with local enterprises to 19.5% of core trade spend.
♦ Continuing to focus on the use of Quick Quote for Works up to £2m to
improve the engagement of local enterprises in Council tenders, with 8 local
awards totalling £1.8m through this route.
♦ Participation in local supplier engagement events with the Supplier
Development Programme and participation in National Meet the Buyer events.  
♦ Participation in the Build Lanarkshire events period including presentations on
Quick Quotes, Community Benefits, Community wish lists and building new
supplier relationships.
♦ Promotion of subcontracting opportunities for local enterprises with Scotland
Excel framework opportunities and HubSW projects. 
Community Benefits
Community Benefit clauses require contactors to deliver long term sustainable social
and economic benefits to the South Lanarkshire community, while demonstrating
Best Value in contract awards. 
The Procurement Reform (Scotland) Act 2014 requires the Council to consider
Community Benefits for contract values over £4m, however, the Council will consider
inclusion of Community Benefits in all regulated tenders (over £50,000), regardless
of value, where appropriate to the supplier, value and duration of the contract. 
Consideration of Community Benefits is embedded in the Council’s Sourcing
Strategy and clearly stated in the tender documents to ensure transparency and
fairness in the evaluation process. 
The Council has a points-based system to target Community Benefits, with the
number of points based on the value and duration of the contract.  Suppliers select
appropriate community benefits from the Council’s menu of deliverables, including
employability through apprenticeships, work placements, local employment and
engagement with local and SME subcontractors in the supply chain.  Since 2023, the
Council’s Community Benefit points menu includes commitments from the
Community Wish List.   
In 2023/2024, the Council went live with a new monitoring system for Community
Benefits called “Cenefits” which enables Community Benefit commitments to be
monitored with contracted suppliers.  A series of successful engagement events with
123

Page 124

Council suppliers were held with the Supplier Development Programme to launch the
Cenefits system. 
Of the contracts awarded in 2023/2024, 31 had specific Community Benefit
outcomes, with the benefits committed detailed below. Included in Community
Benefit delivery this year was fulfilment of 21 wishes from the Council’s Community
Wish List. 
Community Benefit 2023/2024 2022/2023
Targeted recruitment and training, including
apprenticeships and work placements
47 31
Supply Chain Initiatives 3 15
Use of local SME 11 21
Use of social enterprise or supported business - 2
Community consultation 4 6
Poverty Initiatives - 12
Young Person engagement 2 11
Educational Career Development support 118 21
Community Endowment 8 8
Local Events 6 5
Physical infrastructure - 1
Local sponsorship 5 15
Mentoring 3 5
Financial donation  25 -
Environmental support in Education 2 -
Environmental improvements 2 -
Other, including volunteering  4 8
Total 240 161 
Community Benefit status 
Of the 240 Community Benefits committed in 2023/2024, the following diagram
summarises the delivery status of each contract. 
43
33
5
159
Community Benefit delivery 2023/2024
Complete In progress Overdue Due later in contract
124

Page 125

Community Benefit case studies 
Household Waste Recycling Centres: contractor Biffa Waste Services
Contract duration: 7 years
Contract value: £39m
Community Benefit points: 560 
Biffa Waste Services were awarded a seven-year contract by the Council in 2023/2024
to manage and operate South Lanarkshire’s Household Waste Recycling Centres. 
Due to the high value of this contract, 560 Community Benefits Points were allocated
for delivery over the contract period. 
A range of Community Benefits for the communities of South Lanarkshire were
committed including the employment of eleven local individuals across the Recycling
Centres, engagement with eight local SMEs in the supply chain for this contract and
support for environmental improvement projects across South Lanarkshire. 
Delivery of committed benefits is underway with the recruitment of all eleven new
employment opportunities complete.  This has provided a range of roles of varying
skill levels across the Waste Recycling Centres for eleven individuals who live in South
Lanarkshire.   
Biffa are also planning their environmental improvements projects through ongoing
initiatives which will be rolled out in Locations across South Lanarkshire.  Biffa work
with charity “Paths for All” championing a happier, healthier and greener Scotland.  In
South Lanarkshire this will support the K-Woodlands adjacent to the East Kilbride
Waste and Recycling Centre via regular litter picking events organised by Biffa and
allowing access to their recycling centres to dispose of the waste. 
Community Groups in South Lanarkshire will also be able to access the Biffa Award
Scheme, with funding available to local Community Groups that are generated via
landfill tax credits.  Groups can apply for funding via their local Waste Recycling
Centre.  Having access to additional funding sources for South Lanarkshire
Community Organisation is vital, especially funding that supports environmental
improvements in our communities. 
Biffa’s Community Benefits will have an on-going impact on South Lanarkshire’s local
economy and communities throughout their contract period.  The Community Benefits
committed have delivered employment opportunities, supply chain opportunities and
support for local communities to make environmental improvements across South
Lanarkshire. 
Festive Lighting: contractor Lightways
Contract duration: 4 years
Contract value: £1.2m
Community Benefit points: 100, delivered by: 
In 2023/2024, Lightways were awarded a four-year contract for maintenance, storage,
erection and dismantling of Festive Lights for the Council and in fulfilment of their
125

Page 126

Community Benefits points, committed to making a financial donation to a local
community project each year of the contract through the Council’s Community Wish
List. 
Following review of the Wish List, Lightways choose to provide support to the
Partnership Group for St. John’s Primary School in Blackwood.  The Partnership
Group were looking for support to reinstate the school garden, which had been a poor
state of repair for some time.  Pupils involved in the John Muir Award had cleared the
garden but needed support to reinstate pathways which were unsafe and inaccessible
for any users with mobility issues. 
Lightways were able to provide and lay new slabs to improve accessibility to the
garden as well as lay aggregate chips to complete the bedding areas the pupils would
like to build raised beds on.  Having not only the donation of goods but also labour
meant the project could progress faster than otherwise anticipated, carrying out task’s
pupils could not complete themselves. 
A representative from the Partnership Group commented “Completion of these tasks
will make a big difference to finishing work in the garden, we are extremely grateful to
Lightways for their generosity.” 
Lightways support has been hugely impactful in the development of the school garden,
making it accessible for all to enjoy and the Council will continue to work with the
contractor over the next four years to deliver the remaining three donations, supporting
more communities across South Lanarkshire. 
126

Page 127

5. Sustainable Procurement and Supported Business Summary 
Sustainable Procurement 
One of the Council’s key strategic objectives is “Sustainable and Ethical” in
recognition of our responsibility to secure wider social, economic and environmental
benefits through contracts, as set out in the Sustainable Procurement Duty. 
The Council uses the Scottish Government’s Sustainable Flexible Framework to
measure organisational progress in embedding sustainable outcomes: the
framework measures performance across the following areas: 
♦ People: training on sustainable procurement tools is progressing across the
organisation (level 2 achieved)
♦ Objective, Strategy and Communications: sustainable procurement duty
embedded in Procurement Strategy (level 4 achieved)
♦ Process: using prioritisation and sustainable toolkits to focus on outcomes at
category and contract level and sustainability scoring improved (level 2
achieved)
♦ Stakeholders: improved engagement for stakeholders (level 2 achieved) 
♦ Monitoring and Reporting: on sustainable procurement outcomes through
procurement strategy and annual report (level 2 achieved) 
Prioritisation Tool 
The outcome from the Council’s Prioritisation analysis is detailed below: this
identifies the categories of spend where the Council has scope to improve
sustainable outcomes and the influence in the market to achieve this.  This analysis
will guide future procurement strategies, focusing on areas of climate impact such as
Construction and Waste Management and those areas with social and economic
impacts, including Social Care and Early Learning. 
♦ Risk: relevance of overall sustainability risk/relevance (environmental, socio-economic and reputational) to procure-
ment category
127

Page 128

♦ Scope: How much scope is there to improve the sustainability of procurement of this category
♦ Influence: level of influence your organisation might have over the market to improve sustainability outcomes 
Examples of good sustainable practice this year include: 
♦ Continued focus on Fair Work First principles, using seven key priorities set
out by Scottish Government
♦ Ensuring Real Living Wage paid in social care contracts, which accounts for
£118m (34%) of council spend.  All Adult Social Care providers are compliant
with living wage levels. 
♦ Continuing to embed the Sustainable Procurement Tools, focusing on the
publication of guidance for sustainability questions to support our mandatory
30% sustainability score. 
♦ Completion of the sustainability test to identify key sustainability measures in
the Care at Home tender. 
Supported Business Engagement 
The involvement of Supported Businesses and Social Enterprises is included in the
strategic objective of “Sustainable and Ethical” and engagement is considered in the
Council’s Sourcing Strategy for new tenders. 
During 2023/2024, the Council’s spend with registered charities totalled £36m, a
similar position to 2022/2023, and we continued to support Supported Business and
Social Enterprises, including: 
Haven Products: Supported Business
The Council has a two-year contract with Haven Products until December 2024 for
production of Homecare uniforms, with an estimated value of £0.180m.  Haven
Products is a supported business, providing employment opportunities to disabled
people. 
Royal British Legion: Supported Business
The Council has a four-year contract in place with Scotland’s Bravest for signage
manufacture until March 2026, with an estimated value of £0.130m.  Scotland’s
Bravest are a supported business supporting veterans with disabilities to develop
new skills, regain independence and earn in a supportive commercial environment. 
Hey Girls Social Enterprise
Hey Girls are based in Dunbar, founded by a mother and her two daughters to
address period poverty through a “Buy One, Give One” social enterprise model.  Hey
Girls continue to be a key supplier in achieving the Scottish Government’s period
poverty targets and the Council’s spend in 2023/2024 was £0.081m. 
128

Page 129

6. Future Regulated Procurements
The Council’s activity over the next two years in regulated procurement will include
existing contracts which are due to be extended or re-let and new tenders.  Appendix
3 provides a list of anticipated future procurements over £50,000 in value.   
The Council continues to develop the use of our long-term flexible framework model
of Procured Service Arrangements for light touch services, including Social Care and
Education.  The Council is also extending the use of Dynamic Purchasing Systems
and working closely with the Scottish Procurement Alliance, Procurement for
Housing and Scotland Excel to identify future collaborative opportunities. 
The following provides some examples from the wide range of projects detailed in
Appendix 3 that illustrate the diverse range of commodities and services being
procured by the Council, including: 
• Adult and Children’s social care services  
♦ Early Learning and childcare
♦ Construction and maintenance contracts for property and roads
♦ Purchase and maintenance of fleet and vehicles
♦ Waste recycling and disposal 
129

Page 130

7. Further Information
Procurement Performance information 
The Council reports on a range of performance indicators, including the level of
procurement spend with local companies (based within the South Lanarkshire area)
and SMEs (small and medium enterprises).  The Council has a consistently high
level of engagement with SMEs overall, with 68% of Council contracts awarded
(above £50,000) to SMEs in 2023/2024. 
Local and SME spend 
The Council’s spend with South Lanarkshire enterprises (including SMEs) increased
from 18% in 2022/2023 to 19.5% in 2023/2024, representing £67m of total spend
within the local area.  Spend with SMEs generally increased by 1% and was
unchanged for South Lanarkshire based SMEs at 17%.  Our actions around the
Community Wealth Building Strategy aim to improve local spend levels in the future. 
Indicator 2021/2022 2022/2023 2023/2024
Total procured spend £384m £388m £385m
Core Trade spend £345m £351m £346m
Core spend in South Lanarkshire area 18% 18% 19.5%
Core spend with South Lanarkshire SMEs 17% 17% 17%
Core spend with SMEs 50% 49% 50%  
(Source: National Observatory) 
In addition to our direct spend with suppliers in the local area, we are also working
towards identification of subcontracted local spend with our tier one contractors,
particularly in major construction projects.  Our spend with Hub South West in
2023/2024 totalled £10.6m, of which £2.8m (27%) was subcontracted to South
Lanarkshire based enterprises.  Hub South West’s sub-contracted spend to South
Lanarkshire companies from all Hub projects totalled £4.1m: confirming the
importance of encouraging our local enterprises to engage with wider sub-
contracting opportunities across the public sector. 
Where we spend 
A geographical analysis of the Council’s core spend by area is provided below:
although 19.5% of our spend is within South Lanarkshire, 31% of spend was within
the wider Lanarkshire area and 45% in Glasgow City Region. 68% of our total spend
is in Scotland, which is a slight decrease in comparison to 70% in 2022/2023. 
130

Page 131

Collaborative contracts 
The Council continues to focus on a collaborative approach to procurement
wherever possible and collaborative contracts accounted for 25% of Council spend
in 2023/2024. 
This year, the Council’s spend through Scotland Excel frameworks totalled £48.4m,
of which £6.7m (14%) was spent with local suppliers, a reduction of 2% in
comparison to last year.  However, these collaborative frameworks generated £70m
of spend with South Lanarkshire based suppliers in total, including spend from other
local authorities, of which 98% was with SMEs.   
Supplier payment performance and e-invoicing 
The Council continues to exceed the national target of 85% of invoices paid within 30
days of receipt, with 94% of invoices meeting this standard in 2023/2024. 
E-invoicing, which enables automated payment of invoices where they can be
electronically matched to a purchase order, has been in place for the Council since
2017.  During 2023/2024, 19% of invoices were paid using the e-invoicing solution.
131

Page 132

7.1. Appendix 1: Regulated Procurement Activity 2023/2024 
Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
01/04/2023 Ordnance Survey
Public Sector Geospatial Agreement
(PSGA) 01/04/2023 31/03/2030 31/03/2030 421,900
01/04/2023
St Mary’s Kenmure, Kibble
Education and Care Centre, The
Good Shephard Centre, Rossie
Young People’s Trust 
Secure Care Services  01/04/2023 31/03/2027 - 3,500,000
03/04/2023 GGR Group Ltd
Supply and Delivery of Mini Crawler
Crane 03/04/2023 29/09/2023 - 72,761
06/04/2023
Richard Aitken (Seedsman) Ltd
and Origin Amenity Solutions Ltd
The Supply and Delivery of Grounds
Maintenance Materials 06/04/2023 31/03/2028 - 3,109,016
07/04/2023 Fujitsu Services
ConSol Annual Maintenance and
Technical Support 01/04/2023 31/03/2024 31/03/2025 411,509
11/04/2023 Ricardo-Aea Ltd
Air Quality Monitoring Support
Services 01/04/2023 01/04/2026 01/04/2028 130,640
11/04/2023 SPIE Scotshield Ltd
Supply, Installation and Maintenance
of a Secure Door Entry System in
Council Offices 21/03/2023 19/03/2028 19/03/2031 133,531
12/04/2023 Metdesk Limited
The West of Scotland Local
Authorities Weather Forecast and
Maintenance Partnership 16/05/2023 15/05/2028 15/05/2033 13,500,000
17/04/2023 Hillhouse Quarry Company Hamilton Area Roadstone - April 17/04/2023 21/04/2023 - 52,505
20/04/2023 Includem Structured Review Service 01/04/2022 30/06/2023 30/06/2024 100,000
20/04/2023 M Squared (Scotland) Ltd Patterson Drive Law - New Fencing 01/06/2023 01/09/2023 - 64,374
132

Page 133

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
24/04/2023 Linets
Legal Online Research Package -
Annual Subscription 01/04/2023 31/03/2026 - 64,103
26/04/2023 Motus Commercials
Supply and delivery of Heavy
Vehicles - 18,000kg Whale Tanker  26/04/2023 31/07/2023 - 104,220
26/04/2023 SLR Consulting Waste Consultancy Services  26/04/2023 31/03/2025 31/03/2026 134,658
28/04/2023 Figtree Systems (Europe) Ltd
Figtree Risk Management
Information System 09/05/2023 08/05/2028 08/05/2033 335,689
28/04/2023 Scottish Borders Council
The Supply and Application of Tanker
Applied Road Surface Coatings 01/05/2023 30/04/2028 - 2,000,000
03/05/2023 Disclosure Scotland Disclosure Checks 01/05/2023 30/04/2033 - 825,000
08/05/2023 South Lanarkshire College Multiply Programme 08/05/2023 31/03/2025 31/03/2026 238,758
10/05/2023 Aecom Ltd
Local Transport Strategy for South
Lanarkshire Council 11/05/2023 31/01/2024 - 116,673
19/05/2023 Prime Build Solutions Ltd Biggar Corn Exchange - Roof Works 19/05/2023 18/02/2024 - 130,487
24/05/2023 Critiqom Ltd
Provision of Volume Mailing and
Associated Services (for outbound
mail and digital communications) 01/06/2023 30/06/2025 - 3,643,014
24/05/2023 The Lowry Centre Limited
Theatre Booking and Ticketing
System 01/08/2023 31/07/2025 31/07/2026 120,770
26/05/2023 Id Computer Software Ltd Grantvisor and BizVisor Software 01/04/2023 31/03/2026 - 62,530
30/05/2023 Dennis Eagle Ltd
Supply and delivery of Heavy
Vehicles 30/05/2023 31/12/2023 - 1,130,022
31/05/2023 Various Suppliers
Passenger Transport mini
competition 1 16/08/2023 26/06/2024 26/06/2025 3,086,605
01/06/2023 Hillhouse Quarry Company Supply and delivery of roadstone 01/06/2023 30/06/2023  58,979
07/06/2023 Physicare
Provision of Employee Physiotherapy
Services 08/06/2023 07/06/2024 07/06/2025 420,000
08/06/2023
Certas Energy UK Ltd and
Highland Fuels Ltd
The Supply and Delivery of Liquid
Fuels 17/05/2023 31/03/2025 - 7,135,604
133

Page 134

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
08/06/2023 Aebi Schmidt UK Ltd
Supply and delivery of Heavy
Vehicles - Sweeper  08/06/2023 31/12/2023 - 87,626
09/06/2023 Various Suppliers
Supply and Distribution of Fresh
Meats, Cooked Meats and Fresh Fish 08/06/2023 31/03/2027 - 2,046,000
12/06/2023 Various
Framework Agreement for Business
Support and Expert Help Services
2023 - 2025 03/07/2023 31/03/2025 - 131,667
12/06/2023 Various Suppliers
Passenger Transport mini
competition 3 16/08/2023 26/06/2024 26/06/2025 575,319
14/06/2023 PDC Ltd
Installation of Door and Door Entry
Systems MTC 2023 - 2026 19/06/2023 26/06/2026 - 358,559
15/06/2023 Pam Wellbeing Ltd
Occupational Health, Employee
Assistance Programme and Eye
Care Services Framework 01/07/2023 30/06/2026 - 811,504
19/06/2023 Various Suppliers Supply and delivery of Plant  19/06/2023 29/12/2023 - 646,060
19/06/2023 BCA Insulation Ltd
Strutherhill Zone C - Cavity Wall
Insulation 19/06/2023 18/03/2024 - 115,563
19/06/2023
Bustec Scotland Ltd, Riverside
Truck Rental Ltd and Agmors
Coachworks Ltd
Framework for the Provision of
Vehicle Body Repairs 19/06/2023 18/06/2027 - 980,000
19/06/2023 Hillhouse Quarry Company Supply and delivery of roadstone 19/06/2023 18/06/2023 - 191,699
19/06/2023 Motus Commercials
Supply and delivery of Heavy
Vehicles  19/06/2023 29/12/2023 - 388,815
19/06/2023 Various Suppliers
Passenger Transport mini
competition 3 16/08/2023 26/06/2024 26/06/2025 1,499,935
22/06/2023 Ailsa Building Contractors Ltd
Strutherhill Zone C - Roughcast and
Rendering 22/06/2023 21/03/2024 - 336,354
26/06/2023
Neighbourhood Networks In
Scotland Ltd
Neighbourhood Based Support for
Vulnerable Individuals 01/05/2023 30/04/2024 30/04/2025 171,246
134

Page 135

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
30/06/2023 Capita Business Services Ltd
Integrated Housing and Property
Management System (IHPMS) 01/07/2023 01/07/2030 - 2,163,904
01/07/2023 Hillhouse Quarry Company Supply and delivery of roadstone 01/07/2023 31/07/2023 - 57,053
01/07/2023 Hillhouse Quarry Company Supply and delivery of roadstone 01/07/2023 31/07/2023 - 72,240
01/07/2023 Hillhouse Quarry Company Supply and delivery of roadstone 01/07/2023 31/07/2023 - 56,681
04/07/2023 Affiniti Response Ltd Hawbank Roads Depot 04/07/2023 03/04/2024 - 224,578
05/07/2023 Cromwell Polythene Ltd
Mini Competition for Supply and
Delivery of Compostable Food Waste
Liners 10/07/2023 09/07/2024 09/07/2025 95,976
07/07/2023 Randstad Solutions Ltd
Social Care Agency Worker to
support Large Scale Investigation 11/07/2023 10/01/2024 09/07/2024 132,044
10/07/2023 Capita Business Services Ltd
Provision, Support and Maintenance
of eLearning and Development
Platform 01/08/2023 31/07/2024 31/07/2025 504,428
11/07/2023 Paper Shredding Services Ltd
Secure Destruction of Confidential
Waste 11/07/2023 10/07/2026 10/07/2028 50,575
14/07/2023 Various Suppliers
Passenger Transport mini
competition 4 16/08/2023 26/06/2024 26/06/2025 261,183
14/07/2023 Various Suppliers
Passenger Transport mini
competition 5 16/08/2023 26/06/2024 26/06/2025 342,114
19/07/2023 Loretto Care T/A Wheatley Care 1st Stop Accommodation 01/07/2023 30/06/2024 30/06/2025 201,494
19/07/2023 Loretto Care T/A Wheatley Care Outreach Support 01/07/2023 30/06/2024 30/06/2025 142,012
21/07/2023 Prime Build Solutions Ltd
South Vennel Roof Repairs -
Replacement 21/07/2023 20/04/2024 - 151,103
26/07/2023 Sovereign Group Ltd
Supply and Delivery of
Composite/UPVC Doors and UPVC
Windows 01/08/2023 31/07/2024 - 1,000,000
135

Page 136

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
28/07/2023 ADT Fire and Security Plc
Maintenance of Fire and Intruder
Alarms (ADT) 31/07/2023 30/07/2028 30/07/2031 646,853
31/07/2023
Maths Recovery Council UK
Resources Maths Recovery Training Courses 01/09/2023 18/05/2024 - 140,000
01/08/2023 Hillhouse Quarry Company Supply and delivery of roadstone 01/08/2023 30/08/2023 - 52,296
02/08/2023 Intelligent Health Beat the Street 08/08/2023 07/08/2025 07/08/2027 494,237
03/08/2023 Kooth Digital Health Limited
Provision of Online Mental Health
and Wellbeing Support for Children
and Young People 10/06/2023 09/06/2024 - 180,094
04/08/2023 Elveden Farms Ltd
Supply and Delivery of Christmas
Trees 2023 04/08/2023 31/12/2023 - 62,847
07/08/2023 Aon UK Ltd Tenants Contents Insurance 01/10/2023 30/09/2026 - 395,424
09/08/2023 Chargemaster Ltd 
Installation of Electric Vehicle
Charging Points (various locations)  09/08/2023 29/02/2024 - 165,000
10/08/2023 Motus Commercials
Supply and delivery of Heavy
Vehicles 10/08/2023 31/03/2024 - 155,955
10/08/2023
Park's Of Hamilton (Townhead
Garage) Ltd Supply and Delivery of Light Vehicles  10/08/2023 31/08/2023 - 90,195
10/08/2023 Training Initiatives Ltd
GradU8 - Winter Leavers
Construction Provision 29/08/2023 21/12/2023 - 63,000
14/08/2023
CRD Property Renovations and
Reinstatement Hamilton Towers Strip Out Works 01/08/2023 30/11/2023 - 122,374
14/08/2023 Maclay Civil Engineering Ltd
NEC3 Engineering and Construction
Contract Option B for A72 / M74
Junction 7 Signalisation 14/08/2023 01/03/2024 - 1,539,675
16/08/2023 Hillhouse Quarry Company Supply and delivery of roadstone 16/08/2023 15/08/2023 - 74,473
17/08/2023
Joseph Leckie and Sons Contracts
Ltd
First Steps Nursery Extension -
Groundworks and Brickwork 17/08/2023 02/05/2024 - 245,812
136

Page 137

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
23/08/2023 Fleming Buildings Ltd
First Steps Nursery - Timber Kit
Package 23/08/2023 01/05/2024 - 134,304
24/08/2023 Various Suppliers
Education Services PSA phase 2
new applicants 28/08/2023 19/12/2026 19/12/2033 42,500,000*
25/08/2023 Edenred (UK Group) Ltd Employee Discounts Scheme 01/10/2023 11/08/2027 - 178,471
25/08/2023 Edenred (UK Group) Ltd Reward and Recognition Scheme 12/08/2023 11/08/2027 - 168,000
25/08/2023 Gravitas Recruitment Group Ltd
IT Services (Integrated Housing and
Property Management System) 28/08/2023 27/12/2024 27/06/2025 203,125
28/08/2023 Affiniti Response Ltd
Kyle Court, Cambuslang - Upgrade of
Communal Areas 01/10/2023 05/04/2024 - 217,172
28/08/2023 Blantyre Park Services Ltd
First Steps Nursery - Mechanical
Package 28/08/2023 06/05/2024 - 178,807
28/08/2023
Sportex Group Ltd and Cia Fire
and Security Limited
Upgrade of Whitemoss Tennis Court,
East Kilbride 07/09/2023 02/11/2023 - 92,814
30/08/2023 Abacus Lighting Ltd
Douglas Primary School -
Floodlighting Installation 30/08/2023 11/10/2023 - 78,679
31/08/2023 Blue Triangle Housing Asoc Ltd Family First Stop - Charles Brownlee 01/08/2023 31/03/2024 - 319,670
31/08/2023 Blue Triangle Housing Asoc Ltd
Stop Supported Accommodation -
Wide Close 01/08/2023 31/03/2024 - 174,282
31/08/2023 Blue Triangle Housing Asoc Ltd
Supported Accommodation -
Clydesdale Street 01/08/2023 31/03/2024 - 129,849
31/08/2023 Blue Triangle Housing Asoc Ltd Outreach - Prevent and Sustain 01/08/2023 31/03/2024 - 63,829
01/09/2023 GMG Contractors Ltd
East Kilbride Package 98 External
Fabric  Upgrade Re-Tender 09/10/2023 06/05/2024 - 871,130
04/09/2023 Pilcher Consulting Services Ltd
Oracle Fusion Project Management
Resource 30/08/2023 31/05/2024 - 147,500
137

Page 138

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
06/09/2023 Bryson Tractors Ltd
Supply and Delivery of Compact
Tractor Complete with Mounted
Brushes, Lot 9 06/09/2023 30/09/2023 - 78,700
07/09/2023 British Telecommunications Plc
Provision and Maintenance of CCTV
Circuits 01/04/2023 31/03/2024 - 84,256
11/09/2023 Affiniti Response Ltd
First Steps Nursery Joinerwork
Package 01/01/2024 09/09/2024 - 121,253
14/09/2023 C and S Group Uddingston Library Refurbishment 14/09/2023 06/11/2023 - 56,379
14/09/2023 Inspirent Ltd
South Lanarkshire Council Social
Enterprise Business Accelerator 02/10/2023 31/03/2024 31/03/2025 163,400
18/09/2023 Lyreco UK Ltd General Stationery and Office Paper 01/07/2023 30/06/2027 30/06/2028 3,600,000
19/09/2023 Hillhouse Quarry Company Supply and delivery of roadstone 19/09/2023 18/09/2023 - 59,769
20/09/2023 Eden Springs (UK) Ltd
Supply, Delivery, Installation and
Maintenance of Bottled Water
Coolers and Mains  Fed Coolers 02/10/2023 30/09/2027 30/09/2027 220,000
22/09/2023 Aps Group (Scotland) Ltd
Blue Badge Digital Service Blue
Badge Printing and Fulfilment
Services 05/02/2023 04/02/2026 - 75,000
26/09/2023 A M Phillip Trucktech Ltd
Supply and delivery of Heavy
Vehicles under Scotland Excel Heavy
Vehicle Purchase Framework
Agreement 03-21 26/09/2023 31/03/2024 - 197,987
26/09/2023 Parks Motor Group
Supply and delivery of Heavy
Vehicles 26/09/2023 31/03/2024 - 179,383
26/09/2023 Totalmobile Ltd Home Care Workforce Scheduling 16/10/2023 16/10/2026 16/10/2027 1,978,093
28/09/2023 A.M.1. Consulting Ltd
Oracle Cloud Fusion Implementation
Resources 01/10/2023 31/05/2024 - 486,178
28/09/2023 Randstad Solutions Ltd
Social Care Agency Worker - Adult
and Older People (East Kilbride) 01/10/2023 31/03/2024 30/09/2024 68,978
138

Page 139

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
01/10/2023 Parks Of Hamilton Supply and Delivery of Light Vehicles  01/10/2023 31/03/2024 - 1,810,552
10/10/2023 Rsk Environmental Ltd
Initial Appraisal and condition survey
Duke Street Multi storey Car park
Hamilton 10/10/2023 09/01/2023 - 58,720
11/10/2023 Training Initiatives Ltd
YES Construction Tasters South Lan
Wide 2023 31/10/2023 30/10/2024 - 57,600
13/10/2023 Carter Ceilings Ltd
Our Lady of Lourdes Primary School
Suspended Ceilings 13/10/2023 13/10/2024 - 76,915
13/10/2023 Kentallen Mechanical Services Ltd
Our Lady of Lourdes Primary School
- Mechanical 13/10/2023 12/10/2024 - 995,027
13/10/2023 Procladd (Scotland) Ltd                
Our Lady of Lourdes Primary School
- Rainscreen Cladding 13/10/2023 12/10/2024 - 338,882
13/10/2023 Scottech Ltd
Our Lady of Lourdes Primary School
- Curtain Walling 13/10/2023 12/10/2024 - 225,340
17/10/2023 Burcot Grange and Lodge
Provision of Free Personal Care,
Burcot Grange Care Home 15/08/2023 14/08/2028 - 107,303
25/10/2023 The Nurture Group Network Ltd
Supply of Nurture UK Emotional and
Behavioural Interventions, Training
and Resources 01/11/2023 31/10/2025 - 200,000
26/10/2023
Enhance Healthcare Clyde Valley
Ltd, Real-Life Options and Garvald
West Linton Ltd
Care Homes for Adults with Learning
Disabilities Including Autism 16/09/2023 15/09/2024 - 697,576
27/10/2023 CRD Property Renovations  SLC Void Properties Reinstatements 27/10/2023 12/04/2024 - 500,000
29/10/2023 John McGeady Ltd
Repairs to Roads within Larkhall,
Priestfield and Philipshill Cemeteries 30/10/2023 21/11/2023 - 78,143
01/11/2023  EQUAL SAY LIMITED  Adult Advocacy Services 01/11/2023 31/10/2026 - 2,282,274
139

Page 140

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
03/11/2023 Sidey Solutions Ltd
Supply and Install of Doors and
Windows: Cambuslang, and
Rutherglen 15/01/2024 01/07/2024 - 1,365,402
06/11/2023 Gravitas Recruitment Group Ltd
IT Services (Integrated Housing and
Property Management System) 13/12/2023 12/12/2024 12/06/2025 270,444
16/11/2023 Karing International Ltd 
Supply and Delivery of Hot and Cold
Beverage Supplies, Equipment, and
Machinery  01/12/2023 30/11/2028 - 189,233
20/11/2023 Fuellink Systems Ltd
Repair and Maintenance of In-House
Fuel Management System 01/12/2023 30/11/2028 30/11/2030 77,840
21/11/2023 Affiniti Response Ltd
St. John The Baptist PS - Phase 1
Kitchen Extension and Roof Repairs:
Joinerwork 21/11/2023 31/08/2024 - 75,684
21/11/2023 Kentallen Mechanical Services Ltd
St. John The Baptist PS - PH1
Kitchen Extension and Roof Repairs:
Mechanical 21/11/2023 31/08/2024 - 90,000
22/11/2023 Hawthorn Heights Ltd Muga Surface Upgrade 23-24 30/11/2023 01/04/2024 - 145,004
22/11/2023 Jewson
Strutherhill Zone C - Roofing
Materials 23/11/2023 23/11/2024 - 154,508
23/11/2023 Perfect Service Solutions Ltd Kitchen Canopy Cleaning 27/11/2023 26/11/2026 26/11/2028 181,550
26/11/2023 Gravitas Recruitment Group Ltd
IT Services (Integrated Housing and
Property Management System) 22/12/2023 12/12/2024 22/06/2025 155,250
28/11/2023
Parks Of Hamilton (Townhead
Garage) Ltd Supply and Delivery of Light Vehicles 05/12/2023 05/06/2024 - 203,347
29/11/2023 Various Suppliers
Adult Supported Living PSA phase 3
and 4 new applicants 15/11/2023 14/09/2035 - 242,837,766*
01/12/2023
Care and Repair In South
Lanarkshire Assistive Technology Installation 01/12/2023 30/11/2024 30/11/2025 148,170
01/12/2023 SOFTCAT PLC  Web Security Gateway Licences 01/10/2023 30/08/2024 - 70,513
140

Page 141

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
07/12/2023 Q-Free (Bristol) Uk Ltd
Supply, Installation and Maintenance
of Cycle and Pedestrian Counting
Equipment 22/12/2023 21/12/2028 20/12/2031 141,272
14/12/2023
The Salvation Army Trustee
Company
Interim Ukrainian Displaced Persons
Accommodation Service 12/12/2023 01/11/2024 - 666,584
18/12/2023 Boyco (UK) Limited
Our Lady of Lourdes Primary School
- Fixed Furniture 18/12/2023 18/09/2024 - 80,045
18/12/2023 Ochil Tower School
Residential Placement (AS) for Ochil
Tower School 01/08/2023 31/07/2024 - 142,503
20/12/2023 Halfords Limited Cycle to Work Scheme 08/01/2024 08/02/2028 - 303,107
22/12/2023 Rm Education Ltd
Supply and Support of Secure
Broadband Connectivity Services 01/01/2024 30/06/2025 - 129,969
10/01/2024
Joseph Leckie and Sons Contracts
Ltd
Shawlands Crescent Play Area,
Swinhill Travelling People Site 15/01/2024 08/04/2024 - 65,457
11/01/2024 Ailsa Building Contractors Ltd
Internal Refurbishment and Utility
Works, Travelling People Site,
Larkhall 01/02/2024 31/05/2025 - 910,274
11/01/2024 Biffa Waste Services Ltd
Management and Operation of
Household Waste and Recycling
Centres (HWRC) 01/04/2024 31/03/2031 31/03/2034 39,096,332
12/01/2024 AF Jamieson
Provision of Piano Tuning,
Maintenance and Repair Services 15/01/2024 14/01/2029 14/01/2030 234,123
12/01/2024 Computacenter (UK) Ltd Roads Asset Management System 22/01/2024 21/01/2031 21/01/2036 1,679,556
15/01/2024 Various Suppliers
Maintenance Of Building Energy
Management System Installations
including Underfloor Heating 22/01/2024 21/01/2029 21/01/2031 1,380,475
16/01/2024 Zurich Insurance PLC
Engineering and Inspection
Insurance 01/04/2024 31/03/2027 31/03/2030 1,332,772
141

Page 142

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
17/01/2024 Lightways (Contractors) Ltd
Maintenance, Storage, Erection and
Dismantling of Festive  Lighting 07/01/2024 06/01/2028 06/01/2029 1,281,323
23/01/2024 Ayrshire Tree Surgeons Ltd
Tree Surgeon works various
locations 04/04/2024 03/05/2024 - 62,081
24/01/2024 Wellwood Communications Ltd
Provision, Maintenance and Support
of Telephony and Communication
Services 01/02/2024 31/01/2027 31/01/2029 3,100,000
25/01/2024 BEMCO Ltd
Supply and Delivery of Smoke
Detectors 12/02/2024 11/02/2026 11/02/2028 1,455,405
25/01/2024 Chubb Fire and Security Ltd
Maintenance of Fire and Intruder
Alarms 01/09/2023 30/09/2024 30/09/2024 171,426
25/01/2024 Landcare Solutions (Scotland) Ltd
Scottish Government Play
Investment Programme - Larkhall
Area 19/02/2024 05/04/2024 - 320,640
25/01/2024 Women's Aid South Lanarkshire
Domestic Abuse and Refuge
Services 01/01/2024 30/09/2024 - 626,999
26/01/2024 Ashbourne Lodge Care Home
Provision of Free Personal Care, at
Ashbourne Lodge Care Home 27/03/2024 26/03/2026 26/03/2029 113,916
26/01/2024 Dovestone Estates Limited   Care Home- Wray Common 01/04/2023 01/04/2026 01/04/2029 105,744
26/01/2024 Excel Vending Limited Vending Machine services 26/01/2024 26/04/2024 - 65,440
31/01/2024
High Flyers In The Woods and 
Lindy Loo Childmining
Early Learning and Childcare PSA
phase 8 and 9 new applicants 31/01/2024 31/07/2030 - 143,500,000*
01/02/2024 Covey Befriending
Child Poverty Practice Accelerator
Fund (CPAF) 01/02/2024 31/01/2025 - 79,897
01/02/2024 Covey Befriending
Child Poverty Practice Accelerator
Fund (CPAF) 01/02/2024 31/01/2025 - 59,923
01/02/2024 Vodafone Ltd Mobile Voice and Data Services 03/02/2024 26/08/2026 26/02/2028 1,200,000
02/02/2024 Cr Smith Manufacturing Limited David Walker Gardens Roof Repairs 01/03/2024 31/05/2024 - 154,331
142

Page 143

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
02/02/2024
RACAM Security and
Communications Ltd
CCTV Infrastructure Phase 1 -
Supply, Install and Maintenance of
Cameras 02/02/2024 31/03/2027 - 142,660
06/02/2024 BEMCO Ltd
Light Fittings and Accessories - Our
Lady of Lourdes Primary School 06/02/2024 06/05/2024 - 54,394
08/02/2024
Joseph Leckie and Sons Contracts
Ltd
Philipshill Cemetery Extension, East
Kilbride 12/02/2024 06/05/2024 - 498,492
14/02/2024 Wolf Laundry Ltd
Supply, Delivery, and Installation of
Laundry Equipment, including
Airwallets and Maintenance 04/03/2024 31/03/2029 - 216,285
15/02/2024
Tamaris Healthcare (England)
Limited  Hillside Lodge Care Home 01/04/2023 01/04/2026 01/04/2029 243,759
19/02/2024 Alliance Disposables Ltd
The Supply and Delivery of Janitorial
Products 19/02/2024 18/02/2028 - 5,320,000
20/02/2024 Edmundson Electrical Limited
Supply and Delivery of PV Panels
and Accessories, Shawlands
Crescent, Larkhall 26/02/2024 31/08/2024 - 62,124
22/02/2024 Stepford Contracts Ltd
Capital Footway Resurfacing
Scheme- Milford, EK 04/03/2024 29/03/2024 - 50,484
23/02/2024 Ailsa Building Contractors Ltd Springhall Fabrics Phase 6 25/03/2024 01/11/2024 - 1,083,262
23/02/2024 Risk Management Partners Travel Insurance 01/04/2024 31/03/2027 31/03/2030 61,077
28/02/2024 Crown Paints Ltd
Supply and Delivery of Paint, Paint
Sundries and Paint Packs 04/03/2024 03/03/2025 03/03/2026 279,195
28/02/2024 MGM Timber (Scotland) Ltd Supply and Delivery of Timber Doors 04/03/2024 03/03/2026 03/03/2028 604,771
29/02/2024 Computacenter UK Ltd 
VMWare Workspace ONE Advanced
Licences 2024-2025 29/01/2024 28/01/2025 - 115,255
143

Page 144

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
05/03/2024 Turner and Townsend
Country Parks Masterplan -
Calderglen and Chatelherault 05/03/2024 24/09/2024 - 249,150
05/03/2024 Zurich Insurance Plc SLLC Insurance (Lot 10) 01/04/2024 31/03/2027 - 853,198
07/03/2024 GMG Contractors Ltd Springhall Fabrics Phase 5 01/04/2024 01/11/2024 - 1,008,042
08/03/2024
Greenleaf Estate Maintenance Ltd
and Excel Environmental Services
Pest Control and Other
Environmental Services 01/04/2024 31/03/2026 - 4,000,000
13/03/2024 GMG Contractors Ltd
St Leonards, East Kilbride – Re-
Roofing and External Wall Insulation
– Pilot Project 13/03/2024 13/12/2024 - 196,831
14/03/2024 Autopress Education Ltd                      Maths Recovery Supplies 01/08/2023 31/07/2025 31/07/2026 100,000
14/03/2024 Storm Environmental Ltd
Supply and Delivery of Communal
Recycling Bins 14/03/2024 30/09/2024 31/03/2025 167,250
19/03/2024 M Squared Ltd Woods Stock Fencing 01/04/2024 30/04/2024 - 96,387
19/03/2024 Sonova UK Ltd T/A Phonak UK Ltd
Supply and Delivery of Phonak FM
Systems 10/01/2024 09/02/2028 - 140,000
20/03/2024 Liebherr Great Britain Ltd Hire of a Material Handler 01/01/2024 30/06/2024 31/12/2024 75,060
22/03/2024 Azets Holdings Ltd SLLC Audit Services 22/03/2024 21/03/2025 21/03/2026 73,500
22/03/2024
Hillhouse Quarry Group Ltd T/A
MacAsphalt
Carriageway Resurfacing/Anti
Skid/Lining - A73 near Hyndford
Bridge, Lanark 22/03/2024 24/03/2024 - 62,682
26/03/2024 Datatank Ltd
Council Tax Discount and Exemption
Review 01/04/2024 31/03/2027 31/03/2029 247,825
26/03/2024 Risk Management Partners Property Insurance   01/04/2024 31/03/2027 31/03/2030 10,605,445
26/03/2024 Various
Supply of orchestral and classroom
musical instruments and accessories 14/03/2024 30/11/2025 - 610,000
27/03/2024 Oracle Corporation Uk Ltd
Oracle - OCI IAM - Universal Credit
Expansion 09/04/2024 17/05/2027 - 115,912
27/03/2024
Scottish Water Business Stream
Ltd
Provision of Water and Waste
Services 01/04/2024 31/03/2027 31/03/2028 14,000,000
144

Page 145

Award Date Supplier Description Start Date End Date
Extension
Date
Contract
Value £
28/03/2024
Homecare Scotland Care Services
Ltd Care at Home Services 20/02/2023 31/03/2025 30/09/2025 177,254
28/03/2024 Maven Public Sector Fidelity Insurance 01/04/2024 31/03/2027 31/03/2030 118,820
28/03/2024 Risk Management Partners Contractor All Risks Insurance 01/04/2024 31/03/2027 31/03/2030 89,532
28/03/2024 Risk Management Partners Combined Liability Insurance 01/04/2024 31/03/2027 31/03/2030 4,955,513
28/03/2024 Risk Management Partners Terrorism Insurance    01/04/2024 31/03/2027 31/03/2030 343,136
28/03/2024 Travelers Insurance Company Ltd Motor Insurance 01/04/2024 31/03/2027 31/03/2030 2,217,566
31/03/2024
Country Court Care Homes 3 Opco
Ltd
Provision of Free Personal Care, at
Lakeview Lodge Care Home 01/04/2024 01/04/2026 - 105,744
31/03/2024 JC Peacock Bagged Salt 01/04/2024 31/03/2028 - 160,800
31/03/2024 Various Suppliers Children’s Residential Care 01/10/2022 30/09/2028 - 88,679,076 
*represents the contract value over the life of the long term Procured Service Arrangement for all suppliers
145

Page 146

7.2. Appendix 2: Procurement Strategy 2023-2028 Strategic Objectives update 
Objective Aim Outcome  Progress
Compliance Ensure compliance with
Procurement Regulations
and the Council’s
Standing Orders on
Contracts
Improve compliance and
mitigate risk of contract
challenge. 
Procurement continues to monitor compliance with
regulations and Standing Orders on Contracts across
the Council, as evidenced by
• Review of procurement and purchasing arrange-
ments in readiness for Oracle Fusion
• Implementation of new Scheme of Delegation
arrangements for Standing Orders on Contracts.
Value for
Money
To secure Best Value,
balancing cost and quality
of service and support the
Council in achieving
budget savings 
Improved Value for Money
in support of the Council's
Financial Strategy
We continue to work with Resources in recognising
demand and cost drivers and identifying opportunities
for efficiencies, as evidenced by:
• Procured Spend review under Council’s Transforma-
tional Review Programme, which achieved efficien-
cies of £2m in the first two years.
• Management of price increase requests given infla-
tionary pressures in market
Collaborative Identify and influence
collaborative opportunities
to work with public
partners and drive value
through the power of
public sector procurement. 
Improved levels of
collaborative activity and
delivery of efficiencies 
We continue to engage with procurement partners to
identify collaborative opportunities and influence
development of collaborative working, as evidenced by: 
• 94% participation in Scotland Excel frameworks
• Positive engagement with Scottish Procurement Alli-
ance, Procurement for Housing and Hub South West
Contract and
Supplier
Management
Support Resources to
take a proactive approach
to contract and supplier
management to achieve
Ensure suppliers meet
contractual obligations, drive
improvements in supplier
performance and achieve
efficiency improvements.
We can demonstrate an improved approach to contract
and supplier management, as evidenced by:
• Review of supplier base in anticipation of Oracle Fu-
sion implementation
146

Page 147

innovation and value in
contract delivery. 
• Improved levels of engagement with Social Care pro-
viders 
• Development of new electronic performance appraisal
arrangements in Oracle Fusion. 
Fair Work
First
Work with suppliers to
implement Fair Work First
standards, including
payment of the Living
Wage and compliance
with Council Charters 
Improved Fair Work and
Living Wage arrangements
for those involved in delivery
of Council contracts 
We continue to promote Fair Work First and payment of
the Living Wage, as evidenced by:
• Annual confirmation of payment of Living Wage in all
Social Care contracts
• Continued focus on Fair Work First recommendations
from Scottish Government included in all appropriate
tenders. 
Sustainable
and Ethical
Secure wider social,
economic and
environmental benefits
through contracts as set
out in the Sustainable
Procurement Duty 
Meet the Sustainable
Procurement Duty 
Procurement continues to self-assess progress using
the Scottish Government’s Flexible Framework to
assess the organisational approach to sustainable
procurement. 
• Review of sustainability scoring recommendations to
allocate 30% of technical envelope to sustainable
procurement outcomes, including a specific score for
climate outcomes for the first time. 
Community
Wealth
Building
Support and encourage
the local economy to grow
sustainably through the
effective use of
procurement to develop
local communities and
maximise use of
Community Benefits 
Ensure the spending power
of the Council and
Community Benefits
contribute towards
Community Wealth and
achieve National Outcomes 
Procurement contributes to the local spend pillar under
the Community Wealth Building Strategy, as evidenced
by: 
• Delivering an increase in local spend from 18% to
19.5%, representing £67m spend locally, £60m of
which was with SMEs. 
• Implementation of the new community benefits moni-
toring software “Cenefits”. 
147

Page 148

7.3. Appendix 3: Planned Future Regulated Procurements 2024/2025 and 2025/2026 
Contract Description Expected
Award Date
Estimated Value
(£)
Water Quality Management Services (Including Legionella)  01/04/2024                    300,000 
Supply, Delivery and Installation of Washing Machines - Towers 01/04/2024                    200,000 
Fuel Cards and Associated Services 01/04/2024                 3,300,000 
Utilities - Supply of Electricity  01/04/2024               14,000,000 
Provision of Water and Waste Services  01/08/2024               14,000,000 
Supply and Delivery of Bagged Salt for Winter Road Maintenance 01/04/2024                    170,000 
Supply and Delivery of Cold Permanent Pothole Repair  29/04/2024                    125,000 
Framework for Removals, Storage and Disposals 30/04/2024                    700,000 
Planer and Paver Hire and Works 30/04/2024                 4,000,000 
Treasury Management Consultancy 30/04/2024                     50,000 
148

Page 149

Contract Description Expected
Award Date
Estimated Value
(£)
Repair, Inspection and Maintaining of Catering Machines 2024 30/04/2024                    979,000 
External Printing services 30/04/2024                    250,000 
Hire of Vehicles and Plant  30/04/2024                 3,600,000 
Supply, Delivery and Installation of Commercial Catering Equipment 01/05/2024                 1,000,000 
Groceries and Provisions 01/05/24 1,000,000
Maintenance and Repair of Portable Gas Appliances and Hotboxes 17/05/2024                     50,000 
EVAC Chair Maintenance  30/05/2024                     50,000 
Cashless Parking 30/05/2024                     -   
Analogue to Digital Arc and Device replacement 31/05/2024                    500,000 
Adult Supported Living: individual placement 31/05/2024                 5,310,000 
Parent and Dyadic Therapy  01/06/2024                     75,000 
149

Page 150

Contract Description Expected
Award Date
Estimated Value
(£)
Council Tax Discount and Exemption Review  03/06/2024                     50,000 
Primary School Counselling Services 03/06/2024                    100,000 
Supply and Delivery Vehicle Parts 30/06/2024 1,500,000
Hairmyres Park and Ride  30/06/2024                 3,800,000 
Small Plant Training for Roads and Transportation employees. 30/06/2024                    280,000 
Framework for Small Plant Training  30/06/2024                    480,000 
Supply and Support of Microsoft Licences 30/06/2024                 4,500,000 
Temporary Signs and Associated Products 30/06/2024 120,000
Care at Home Procured Service Arrangement Phase 1 onward 30/06/2024             714,300,000 
Desktop Client Devices 30/06/2024 700,000
External Wall Installation: term contract 30/06/2024 20,000,000
150

Page 151

Contract Description Expected
Award Date
Estimated Value
(£)
Electromagnetic Repairs  30/06/2024 800,000
Wall Insulation Services 30/06/2024 500,000
Supply and Delivery of Refuse Sacks (Waste / Grounds Services) 30/06/2024                     70,000 
Hire of Material Handler 30/06/2024                     89,000 
Supply and Delivery of Communal Recycling Bins 30/06/2024                    170,000 
External Fabrics Term Contractor 30/06/2024               20,000,000 
Supply and Delivery of Specialist Digital Paper 30/06/2024                    280,000 
Christmas Trees 30/06/2024                    200,000 
Support Services for Oracle Fusion 30/06/2024                    600,000 
Care at Home and Housing Support 30/06/2024                 3,000,000 
Tollbooth Lanark, Streetscape Contract  30/06/2024                    300,000 
151

Page 152

Contract Description Expected
Award Date
Estimated Value
(£)
Supply and Delivery of Kitchen Installations 30/06/2024                 8,000,000 
City Deal road programmes (Hamilton)  30/06/2024                 2,100,000 
Contractor – Refurbishment Works / Aids and Adaptations  30/06/2024                 4,800,000 
Online Benefits Calculator 31/07/2024                    200,000 
Provision of Literacy, Numeracy, Health and Wellbeing Educational Assessment  31/07/2024                    300,000 
Taxi Mini Competition -School transport 31/07/2024                 5,000,000 
Domestic Appliance Repair  01/08/2024                    100,000 
Blue Badge Central Record and Badge Ordering Services 03/08/2024                    250,000 
Supply, Installation and Maintenance of Traffic Counting Equipment  30/08/2024                    925,000 
Community Meals 30/08/2024  - 
Larkhall Leisure Centre  31/08/2024
(from)               22,800,000 
152

Page 153

Contract Description Expected
Award Date
Estimated Value
(£)
Supply, Delivery of 2 Wheeled Bins 31/08/2024                    850,000 
Supply, Delivery, Installation and Maintenance of the Corporate Multi-Functional Device Hardware
Fleet 31/08/2024                 1,393,625 
Maintenance of Emergency Lighting Battery Cubicles 01/09/2024                     50,000 
Parent and Child Counselling  01/09/2024                     75,000 
The Provision of Skip Hire 12/09/2024                    437,000 
Care Homes for Adults with Learning Disabilities including Autism 15/09/2024                    700,000 
Income Management System / Online Cashless Payments 29/09/2024                    200,000 
Supply and Delivery of Telecare Peripheral Equipment 30/09/2024                     67,467 
South Lanarkshire Council Warden Call System Upgrades 30/09/2024                    780,000 
Early Language Intervention 30/09/2024                    150,000 
Winter Assistance - Farmers 30/09/2024                     52,000 
153

Page 154

Contract Description Expected
Award Date
Estimated Value
(£)
Provision of Moving and Assisting Training 30/09/2024                    400,000 
Christmas Switch On Events 30/09/2024                    300,000 
Intensive family support for young people in, or at risk of entering, residential care 30/09/2024                 1,500,000 
Legal Services Providers 30/09/2024                    500,000 
Asbestos Waste Skips 30/09/2024                    200,000 
Maintenance of Fire and Intruder Alarms 30/09/2024                    200,000 
Adventure Tourism 30/09/2024                     65,000 
Maintenance of Power Wash Systems 31/10/2024                     50,000 
Digital Connectivity Multi-Lot 30/11/2024               18,000,000 
Provision of Independent Advice and Development Support Customers in South Lanarkshire 30/11/2024                    350,000 
ICT - PSN Connectivity - PSN Circuit  30/11/2024                 1,400,000 
154

Page 155

Contract Description Expected
Award Date
Estimated Value
(£)
Accident Management System  31/12/2024                    200,000 
Secure Site Containers and Welfare Units  15/01/2025                    250,000 
IT Service Management Solutions 28/02/2025                    130,000 
Provision of Debt Recovery and Sheriff Officer Services - Legal Services 28/02/2025                     -   
Supply and Direct Delivery of Postage Stamps 28/02/2025                    115,000 
CCTV Infrastructure Phase 2 – Wi-Fi Network with Additional Supply, Install and Maintenance of
Cameras 13/03/2025                    200,000 
Supply of Coffee and Associated Products 23/03/2025                     65,000 
Self Directed Support Advice  30/03/2025                    300,000 
New Waste Transfer Station 31/03/2025                    200,000 
Supply of Fixings  31/03/2025                    100,000 
Supply of Sealants  31/03/2025                    100,000 
155

Page 156

Contract Description Expected
Award Date
Estimated Value
(£)
IT software Fleet Management  31/03/2025                    118,000 
Franking machines and mail collection 31/03/2025                    150,000 
Supply of Domestic Heating Spares 31/03/2025                    240,000 
Supply of Ironmongery   31/03/2025                    250,000 
Kinship Care Support Service 31/03/2025                    765,000 
Supply and Delivery of Air Source Heating Systems   31/03/2025                 1,680,000 
Educational Services PSA New applicants 31/03/2025               42,141,617 
Early Learning and Childcare - New applicants 31/03/2025             143,000,000 
Adult Supported Living - New applicants 31/03/2025             229,000,000 
Telecare equipment - personal alarms 31/03/2025                    100,000 
Audio Visual equipment in schools 31/03/2025                    250,000 
156

Page 157

Contract Description Expected
Award Date
Estimated Value
(£)
Servicing and Maintenance of Generators  31/03/2025                     50,000 
Interpretation Services 31/03/2025                    500,000 
Maintenance of EV Charging Points 31/03/2025                     80,000 
Extract Fans 31/03/2025                     95,000 
Repair and Renewal of Water Boilers and Under-sink Water Heaters 31/03/2025                    100,000 
Supply and Delivery of UPVC Materials 31/03/2025                    100,000 
Scottish Government Play Investment Programme - Larkhall Area 31/03/2025                    320,640 
Scottish Government Play Investment Programme, Rutherglen and Cambuslang 31/03/2025                    338,600 
Support Programme: Education 31/03/2025                    400,000 
Supply and Delivery of Electrical Materials  31/03/2025                    500,000 
Supply and Delivery of Plumbing Materials 31/03/2025                    500,000 
157

Page 158

Contract Description Expected
Award Date
Estimated Value
(£)
Supply and Delivery of Building and Timber Materials  31/03/2025                    600,000 
Supply and delivery of Catering supplies 31/03/2025                 1,000,000 
Provision and Delivery of Washroom Solutions and Sanitary Products 31/03/2025                 1,500,000 
Light and Heavy Vehicle Repairs (Ad-Hoc Mechanical and Electrical) 31/03/2025                 2,500,000 
Housing support for individuals in Extra Sheltered Housing 31/03/2025                 4,000,000 
Debt Management and Diligence Services  31/03/2025  - 
Energy (Utilities) Management and Supply for Void and New Build Housing Properties 31/03/2025                    200,000 
Repairs to Horseshoe Bridge and associated path network  31/03/2025                    200,000 
Street Lighting Materials 31/03/2025                 2,000,000 
Grounds Maintenance and horticulture: plants, shrubs and trees 31/03/2025                    200,000 
Street Lighting Materials- Columns 31/03/2025                    100,000 
158

Page 159

Contract Description Expected
Award Date
Estimated Value
(£)
Homeless Accommodation Framework 31/03/2025               16,000,000 
Aids and Adaptations - Supply, Delivery and Installation of Disabled Access Ramps  31/03/2025                    250,000 
McKirdy Park - Pitch Replacement                                                31/03/2025                    400,000 
Supply and Delivery of Timber Materials   31/03/2025                    560,000 
Clydesdale Way: project management and associated works 31/03/2025               25,000,000 
Supply and Delivery of External Door Sets and Windows 31/03/2025                 1,600,000 
Speech and Language Therapy 31/03/2025                    200,000 
Light and Heavy Plant, Grounds machinery and Ground Maintenance 31/03/2025                 4,000,000 
The Supply and Delivery of Liquid Fuels 31/03/2025                 7,200,000 
Supply and Delivery of Domestic Furniture and Furnishings 31/03/2025               12,000,000 
Equipu Partnership Agreement 31/03/2025               30,000,000 
159

Page 160

Contract Description Expected
Award Date
Estimated Value
(£)
Audio equipment for deaf and hard of hearing people 31/03/2025                    100,000 
Cathcart Place Industrial Development 31/03/2025                    100,000 
Classroom furniture 31/03/2025                    250,000 
Framework Agreement for Business Support and Expert Help Services 31/03/2025                    500,000 
Maths materials and resources 31/03/2025                    100,000 
Flooring framework  31/03/2025                 1,000,000 
Online learning in reading, writing and maths 31/03/2025                    100,000 
Workflow software solution 31/03/2025                    600,000 
Security for Council Offices 31/03/2025                 3,250,000 
Web based and proprietary devices 31/03/2025                    100,000 
Receipt and Treatment of Container Mix 31/03/2025                     60,000 
160

Page 161

Contract Description Expected
Award Date
Estimated Value
(£)
Receipt and Treatment of Fibre Mix 31/03/2025                     60,000 
Uplift, Disposal (incl Recycling) of Gas Bottles  31/03/2025                     95,000 
Ash Dieback (Various Projects)  31/03/2025                    100,000 
Demolition  of the Newcross centre to support a residential development 31/03/2025                    TBC 
Civic Hub Design Phase 31/03/2025  TBC 
New Build Housing Housing: Westwood, Ash Parks, East Kilbride 31/03/2025  TBC 
New Build Housing – Former McWhirter House 31/03/2025  TBC 
New Build Housing -  Braehead, Blantyre 31/03/2025  TBC 
New Build Housing – Former Cairns Primary School Site 31/03/2025  TBC 
Mill Street, Rutherglen, Communal Boiler Replacement 31/03/2025  TBC 
Deer Park, Larkhall - Communal Boiler Replacement 31/03/2025  TBC 
161

Page 162

Contract Description Expected
Award Date
Estimated Value
(£)
Parker Place, Larkhall - Communal Boiler Replacement 31/03/2025  TBC 
Deer Park Sheltered Housing, Larkhall - Internal Upgrade 31/03/2025  TBC 
Wellbeck House and The Mews Stuart Street, East Kilbride - Internal Upgrade 31/03/2025  TBC 
Bosfield Place Sheltered Housing, East Kilbride - Lift Refurbishment 31/03/2025  TBC 
Strathcona House Sheltered Housing - Lift Refurbishment 31/03/2025  TBC 
John Smith Court Sheltered Housing - Lift Refurbishment 31/03/2025  TBC 
1-26 Stonefield Park Gardens, Blantyre - Pipework 31/03/2025  TBC 
Bosfield Place, Sheltered Housing, East Kilbride - Water Mains Supply 31/03/2025  TBC 
Castlefield Gardens SHC - Ventilation Upgrade 31/03/2025  TBC 
Social Bite Village, Harriet Street, Rutherglen 31/03/2025  TBC 
Lindsay House, East Kilbride - Demolition 31/03/2025  TBC 
162

Page 163

Contract Description Expected
Award Date
Estimated Value
(£)
New Build Housing Priory Road - Former Woodpark PS Site 31/03/2025  TBC 
New Build Housing Housing - Site at Former Ballgreen Hall - Glasgow Road 31/03/2025  TBC 
New Build Housing Housing - Site at Former Lindsay House - Kittoch Street 31/03/2025  TBC 
New Build Housing Housing – Carlisle Road, Hamilton (ELU) 31/03/2025  TBC 
Former ELU, Carlisle Road, Hamilton - Demolition 31/03/2025  TBC 
Clydeford View, Cambuslang - Renewal of Corridor Ceiling and Lighting 31/03/2025  TBC 
McClymont House, Lanark - Feasibility for New Housing Stock 31/03/2025  TBC 
Red Deer Centre, EK - Feasibility for New Housing Stock 31/03/2025  TBC 
Kitchen programme flooring and painting: various locations 31/03/2025  TBC 
Close Refurbishment - Hamilton and Blantyre Area 31/03/2025  TBC 
St. Hilary’s Primary School - MUGA Adaptations 31/03/2025  TBC 
163

Page 164

Contract Description Expected
Award Date
Estimated Value
(£)
Nursery Soft Pore Replacement Project - Various Properties 31/03/2025  TBC 
Heathery Knowe PS - Adaptations 31/03/2025  TBC 
Chatelherault Country Park - Boiler Replacement  31/03/2025  TBC 
Cathkin Library - Cladding Replacement 31/03/2025  TBC 
Mobile Client Devices 31/03/2025                 2,400,000 
National Framework Contract for the Supply of Natural Gas 01/04/2025                 3,100,000 
Provision of Passenger Transport Services  30/04/2025               50,000,000 
Burial and cremation software system 30/04/2025                    300,000 
Provision of a Workwear Rental Laundry Service 31/05/2025                     50,000 
Payables Fraud Software 31/05/2025                    140,000 
Supply of Ad-Blue Fuel Additive 07/06/2025                    160,000 
164

Page 165

Contract Description Expected
Award Date
Estimated Value
(£)
Provision of Employee Physiotherapy Services 07/06/2025                    420,000 
Online Mental Health and Wellbeing Support for Children and Young People 09/06/2025                    180,094 
Maintenance of Sewage Treatment Systems 20/06/2025                     50,000 
Software Solution for Grounds, Street Cleansing and Waste Services 30/06/2025                    100,000 
British Sign Languages and Centre of Approval 30/06/2025                     90,000 
Supply and Support of Secure Broadband Connectivity Services 30/06/2025                    130,000 
End User Computing and Device Management (Desktop) 30/06/2025                 2,500,000 
Provision of Volume Mailing and Associated Services (for outbound mail and digital communica-
tions) 30/06/2025                 3,600,000 
Fostering and Continuing Care 30/06/2025               10,000,000 
Cashless Catering Solution 30/06/2025                    500,000 
Supply, Delivery and Installation of Office Furniture 03/07/2025                 2,450,000 
165

Page 166

Contract Description Expected
Award Date
Estimated Value
(£)
Furniture for Care Homes and Sheltered Housing Complexes 03/07/2025                 2,500,000 
eLearning and Development platform - Clyde Valley Partnership 31/07/2025  TBC 
ECO Stars Commercial Fleet Scheme  31/07/2025                    140,000 
Microsoft Office 365 Backup and Recovery Solutions  31/07/2025                    300,000 
Window and Door Replacement Package 31/07/2025                 2,600,000 
Electronic Payment Services 31/08/2025                    500,000 
Education Digital Futures 30/09/2025               59,000,000 
Land Led Development property sites 30/09/2025  TBC 
Centre West East Kilbride: demolition 30/09/2025  TBC 
Supply and Delivery of Industrial Gases 21/10/2025                     80,000 
Emotional and Behavioural Interventions, Training and Resources 31/10/2025                    200,000 
166

Page 167

Contract Description Expected
Award Date
Estimated Value
(£)
Supply musical instruments 30/11/2025                    800,000 
Supply of Homecare Uniforms - Tunics and Trousers 31/12/2025                    100,000 
Landfilling of Residual Waste (unsuitable for processing via Thermal Treatment Facilities) 31/12/2025                    500,000 
Short Breaks - Child Services  05/01/2026               14,000,000 
Training and Employability Framework 30/01/2026               28,000,000 
Payment Acceptance 31/01/2026                    557,500 
The Supply and Fitting of Tyres for Vehicles and Plant 31/01/2026                 2,200,000 
Blue Badge Digital Service Blue Badge Printing and Fulfilment Services 04/02/2026                     75,000 
Supply, Installation and Maintenance of a Corporate Telematics Solution 28/02/2026                    600,000 
Supply of Paint and Sundries 03/03/2026                    600,000 
Video Conferencing Solution for schools 20/03/2026                    150,000 
167

Page 168

Contract Description Expected
Award Date
Estimated Value
(£)
Lone Working Software 31/03/2026                    160,000 
Day and Crisis Support for Adults with Mental Health Problems  31/03/2026                 1,000,000 
Day Care Services  31/03/2026                 1,000,000 
Befriending services to vulnerable children and young people 31/03/2026                    800,000 
Pest Control, Industrial Cleaning and Other Environmental Services 31/03/2026                 4,000,000 
Advocacy and participation for children and young people 31/03/2026                    120,000 
Supply and Delivery of Personal Protective Equipment (PPE) 31/03/2026                 3,000,000 
Technology Peripherals and infrastructure 31/03/2026                    600,000 
Adult Carers Service 31/03/2026                 4,500,000 
Void Property Protection  31/03/2026                    400,000 
Installation of Door and Door Entry Systems  31/03/2026                    400,000 
168

Page 169

Contract Description Expected
Award Date
Estimated Value
(£)
Provision of ICT Managed Security 31/03/2026                    300,000 
Young Peoples Carer Service 31/03/2026                 4,500,000 
ICT Managed Security 31/03/2026                    680,000 
Printing and Issue of Postal Votes, Printing of Ballot Papers and Postal Vote Management System 31/03/2026                    880,000 
169

Page 170

170

Page 171

Report
Agenda Item 
Report to: Finance and Corporate Resources Committee
Date of Meeting: 30 October 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update of the Finance and Corporate Resources Risk
Register and Risk Control Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-[purpose] 
 present an update on the Risk Register and Risk Control actions for Finance and
Corporate Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the content of the Resource Risk Register following review, detailed at
Appendix 1, be noted; and
(2) that it be noted that the outstanding Risk Control Actions will be progressed
by relevant officers.
[1recs]
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision-making processes.  The strategy requires Resources
to record and review risks and control actions regularly.  Finance and Corporate
Resources follow the guidance in developing, monitoring, and updating the risk
register on an ongoing basis. 
3.2. The purpose of the register is to ensure that the Resource is fully aware of its top
risks; that these risks are prioritised; and that controls are in place to eliminate or
minimise the impact of the risks. 
3.3. The Resource scores the risks in accordance with the council scoring mechanism,
based on likelihood and impact.  This results in risks being scored between one and
twenty five (low – very high). 
3.4. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls). 
3.5. The last update of the Finance and Corporate Resources Risk Register was reported
to the Committee on 6 December 2023. 
3.6. The Resource’s top risk register and risk control plan has been reviewed.  This work
was completed in September 2024.  
13
171

Page 172

3.7. The Central Risk Management team annually review Resource compliance with the
Risk Management Strategy.  The outcome of the 2023/2024 review identified that
Finance and Corporate Resources achieved 100 per cent compliance, scoring 45 out
of a possible 45. 
4. Resource Risk Management
4.1. Each Resource has a Resource Risk Management Group which has responsibility
for the promotion and management of risk.   
4.2. The Finance and Corporate Resources Risk Management Group continues to
consult on a regular basis.   
4.3. The work of the group over the last year has focused on the review and update of
the Resource Risk Register and ensuring that the register reflected the Council Plan
and individual Service Plans. 
5. Risk Register
5.1. Work has been completed by the Resource Risk Group to finalise the review of the
Resource Risk Register.  The update considered risks at a Service level, as well as
strategic council risks. 
5.2. The Resource Risk Register will be monitored on an ongoing basis to allow new
risks to be added and for the control measures and scores of the existing risks to be
reviewed considering new information.   
5.3. Risks can result from internal or external influences, with examples being the impact
of projected funding cuts, legislative changes, or the impact of internal service
changes. 
5.4. The development process for the Resource Plan requires a risk assessment process
to be undertaken as appropriate resulting in some actions within the Resource Plan
having a corresponding risk identified within the risk register. 
5.5. The main changes to the register are summarised below:- 
 Three new very high risks have been added:-
 The Council inherits commercially unviable shopping centres due to the
financial failure of existing owner/management companies resulting in
significant financial and operational liabilities transferring to the Council.
 The Council fails to comply with its statutory duties by not conducting
sufficiently robust impact assessments where the same are required,
including in respect of budget/service redesign proposals, leading to
potential legal and financial challenges, which could result in failure to
deliver those proposals
 The Council fails to comply with or meet the expected standards of scrutiny
and deliver the improvement actions identified by regulatory bodies
 Some key risk wordings have been updated to reflect the current status of risks
and/or to provide more straightforward and understandable risk descriptions
 The risk score for ‘Fraud, theft, organised crime and cyber attacks’ has increased
from 12 to 20.  Whilst controls in this area have been assessed as adequate, the
threat landscape is very active at the moment and shows no signs of easing
 The residual risk score in respect of ‘Lack of capacity and skills to meet increased
service demands’ has increased from 9 to12 in light of a shift in supply/demand of
officers and recruitment difficulties 
172

Page 173

 The risk score has reduced from 16 to 9 in relation to the ‘Implications of the
Scottish Fire and Rescue Service Unwanted Fire Alarm Signals Policy within the
council's non-domestic estate’ risk.  The continuing risk in this area is mainly in
respect of property damage due to a fire when the property is unoccupied out of
hours.  Our property claims history indicates that the risk of fires in non-domestic
properties is low, and additionally our schools are protected either by sprinklers or
fire suppression systems, which further mitigate this risk
 The ‘Community Wealth Building Strategy’ risk score has reduced from 16 to 9 to
align this risk with the risks for the Council’s other plans and strategies
 The ‘IT development/functionality’ risk description has been widened to
encompass implementation of new systems.  This reflects the three significant IT
projects which continue to be progressed at present for the Integrated Housing
Management System, the SWIS+ replacement (Liquidlogic) and Fusion
 The risk score for ‘Failure in delivery of electoral events’ has increased from 4 to
9 after re-evaluation. 
5.6. Risks scored 15 to 25 are considered to be very high risks and risks scored 8 to 12
are considered to be high risks.  Very high and high risks are monitored closely.  The
top risks identified for the Resource, that is those that are residually scored as being
very high and high, are attached at Appendix 1. 
5.7. Appendix 2 provides a comparison of risk scores for 2023 and 2024.  This appendix
also details changes in risk descriptions. 
5.8. Risks evaluated residually as being medium or low risk will be monitored to ensure
that they continue to be adequately managed. 
6. Insurance hotspots and claim mitigation
6.1. There have been no specific insurance hotspot areas identified for Finance and
Corporate Resources. 
6.2. The Risk and Insurance Team are leading on corporate initiatives to mitigate against
liability, motor, and property insurance claims.  This includes a property insurer
survey programme; a Health and Safety/training review undertaken by the Council’s
claims handlers; and ongoing development of driving at work training, with support
from Employee Development. 
7. Horizon scanning
7.1. Through wider analysis and discussion with the council’s Risk Sponsors Group,
areas that could pose potential threats and risks or are emerging issues and
opportunities that could affect the council were identified.  Areas identified are listed
below:- 
 Transformational Change 
The Council is embarking upon a transformational change programme which will
include a series of Cross-Cutting Reviews, focussing on council-wide activities
rather than individual Resources.  Monitoring of the delivery of transformational
change reviews will inform whether an overarching ‘transformational change’ risk
requires to be developed and added to the top risk register.  Outcomes from the
reviews offer mitigation to the top risk on funding.  
173

Page 174

 Scotland Excel Supply Chain Intelligence Report 
A recent Scotland Excel Supply Chain Intelligence report highlights a significant
number national and global issues that will present supply chain challenges.  This
report has been circulated throughout the council and Resources are being
encouraged to prepare and where possible put plans in place to react to the
challenges that arise.  A further intelligence report is due to be provided by the
end of the year. 
 Artificial Intelligence 
As the capabilities of Artificial Intelligence (AI) continue to evolve, there are
potential implications for the Council that warrant close monitoring.  While AI
offers opportunities to enhance efficiency and service delivery, it also presents
risks such as ethical concerns, data privacy issues, and potential displacement of
jobs within the public sector.  The rapid pace of AI development may outstrip
existing regulatory frameworks, leading to challenges in governance and
accountability.  Although AI is not currently included in the risk register, it is
important to remain vigilant, particularly in areas such as automated decision-
making, cybersecurity threats, and the integration of AI-driven tools in public
services. 
7.2. These areas will continue to be monitored to ensure that the council is adequately
prepared to respond where required.   
8. Scope and appetite for risk
8.1. The Council aims to be risk embracing, that is it will accept a tolerable level of risk in
seeking service efficiencies and in agreeing control measures. 
8.2. The level of risk facing the Council is measured both before (inherent risk) and after
(residual risk) consideration of controls.  The council should never carry a very high
residual risk exposure as this would indicate instability, but a low residual risk exposure
should also be avoided as this indicates lack of innovation. 
8.3. The Council’s universal risk tolerance levels are noted within the risk management
strategy, with the ideal risk profile defined as:- 
 No more than 10 per cent of residual risks at a very high level
 No more than 15 per cent of risks at a high level
 Around 50 to 60 per cent of residual risks at a medium level
 No more than 30 per cent of residual risks at a low level  
174

Page 175

8.4. Table 1 below shows Finance and Corporate Resources risk heat map, i.e. it details
the total number of risks for each individual residual risk score.  Table 2 below notes
the overall risk profile for Finance and Corporate Resources risks. 
Table 1 – Finance and Corporate Resources Risk Heat Map
Likelihood
5
Almost Certain    3 
4
Likely   5 4 1
3
Possible  4 9 3 
2
Unlikely 1 10 12 5 
1
Rare 2 8 7    
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table 2 – Finance and Corporate Resources Risk Profile
Risk
Category
Risk
Rating
Number of
residual
risks
Percentage
of residual
risks
1 Very high 8 11%
2 High 22 29%
3 Medium 26 35%
4 Low 18 24%  
74 100.0% 
8.5. Despite the fact that the profile noted in Table 2 is out with the ideal universal risk
exposure defined by the Risk Management Strategy, this risk exposure is reasonable
given the number of high level risks currently being faced by the Resource. 
8.6. Finance and Corporate Resources has ensured that all inherent risks scored at a
very high and high level have cost effective control measures in place.  Where
further control measures are required, these are included within the Resource risk
control plan. 
8.7. The main changes to the risk profile from last year are:- 
 3 new very high risks have been reported
 The Council fails to comply with or meet the expected standards of scrutiny
and deliver the improvement actions identified by regulatory bodies
 The Council fails to comply with its statutory duties by not conducting
sufficiently robust impact assessments where the same are required in
respect of budget/service redesign proposals, leading to potential legal and
financial challenges, which could result in failure to deliver those proposals
 The Council inherits commercially unviable shopping centres due to the
financial failure of existing owner/management companies resulting in
significant financial and operational liabilities transferring to the Council
 1 risk has moved from being high up to very high:-
 Fraud, theft, organised crime and cyber attacks 
175

Page 176

 2 risks have moved from being very high down to high:-
 Implications of the Scottish Fire and Rescue Service Unwanted Fire Alarm
Signals Policy within the council's non-domestic estate
 The Council fails to deliver the objectives of the Community Wealth Building
Strategy
 1 risk has moved from being a medium to a high risk:-
 Failure in delivery of election events 
9. Risk Control Actions
9.1. 6 actions due for completion during 2023/24 have been completed. 75 per cent (6/8)
of control actions were completed on time against an overall Resource target of 90
per cent.  1 action, ‘Develop neighbourhood plans in East Kilbride and Hamilton’, has
been delayed and carried forward to the 2024/2025 risk control plan. 
9.2. 1 further action has been part completed ‘A2D - Digital solution procured and
implemented’.  The Alarm Receiving Centre Digital Solution has been procured;
however, implementation has been delayed by a national communications issue that
manifested.  The Council are awaiting further information from the supplier regarding
the implementation.  The outstanding part of this action has been caried forward to
the 2024/2025 risk control plan. 
9.3. 1 risk control action, ‘Communications to be developed to promote and increase
awareness of the Community Plan with Partners, Businesses and Communities’ that
was due for delivery by the end of June 2024 has been completed on time. 
9.4. Details of the completion of risk control actions during 2023/2024 and 2024/2025 to
date are contained in Table 3 below. 
Table 3 – Completion of risk control actions 
2023/2024
2024/25
(as at 31
August
2024)
Total number of actions due 8 1
Completed on time 6 1
Carried forward to 2023/24 2 0
To be completed at a later date 0 14 
9.5. Progress with completion of Resource Risk Control Actions is monitored by the
Central Risk Management team.  This is also reviewed by the Resource Risk Group. 
9.6. There are currently 14 risk control actions due for completion during the remainder of
2024/2025.  The Committee is asked to note that the outstanding actions to mitigate
risks within the Risk Control Plan will be progressed by the relevant officers. 
10. Three lines model 
10.1.   The ‘three lines’ model was developed by the Institute of Internal Auditors.  When
using this model, risk controls are categorised under three lines of defence.  This
aims to provide assurance around the adequacy of control measures that are in
place to mitigate strategic risks, identify control descriptions that need amendment to
clearly link these to the mitigation of the risk and to highlight any residual gaps in
controls that require to be addressed.  
176

Page 177

10.2. Internal Audit work on the three lines model for the top risks is concluding and
Resource Risk Sponsors will now be provided with individual analysis and guidance
to support them in developing further controls to close any gaps identified from the
three lines approach for the council top risks that they lead on. 
10.3. The guidance will cover the following areas:- 
 introduction and explanation of the three lines model
 a summary of all of the top risks that the Resource is responsible for along with a
percentage analysis (Percentage split of how the existing controls fall into each of
the three lines, highlighting gaps for consideration)  
 some advice for each Resource on how controls can be developed (using
specific examples) to provide a good coverage of controls across the three lines
for each risk area 
11. Major projects, partnerships or change
11.1. Within Finance and Corporate Resources 2 partnerships have been identified.  One
of these is considered to be high risk, the Community Planning Partnership (CPP). 
The remaining partnership (Clyde Valley Learning Partnership) has been assessed
as being low risk. 
11.2. Appropriate risk management arrangements are in place for the CPP with regular
reviews and reports on their risk register and action plan presented to the CPP
Board. 
12. Review of the Risk Management Strategy
12.1. To comply with best practice and to ensure it is fit for purpose, a review the Risk
Management Strategy has been undertaken this year.  The review was undertaken
by the Risk Management team, with input from the Council’s Risk Sponsors. 
12.2. There have been no fundamental changes to the strategy.  The main revisions are
summarised below:-
 A general refresh to bring the strategy up to date including refences to revised
information contained within Connect
 Updated opening Chief Executive Statement 
 Introduction of guidance from the Institute of Internal Audit three lines model, to
allow a better means of recording and categorising risk controls
 Revisions to the risk matrix categories (low, medium, high and very high) to
improve prioritisation and focus mitigation on higher scored risks
 Updated risk tolerance levels to provide a better balance on previously set levels
and acknowledge requirement to accept a higher level of risk 
12.3. In summary the strategy details:- 
 A policy statement which sets out the council’s commitment to risk management,
as one of the principal elements of good governance
 Encouragement of reasonable risk taking in order to make service improvements
and enable positive outcomes; the implementation of mitigating control measures
to avoid or reduce the impact of losses and deterioration in services; the
preparation and testing of business continuity plans for responding to emergency
events
 Clear aims, objectives and measures of success
 How and when to apply risk management
 Roles and responsibilities for employees at all levels in the Council
177

Page 178

 The Council’s risk tolerance level when seeking opportunities, services
efficiencies and in agreeing control measures
 Core requirements for Resources
 Monitoring and Reporting arrangements 
12.4. The revised strategy will take effect from 1 April 2025, to allow to final round of
2024/2025 risk reporting to be completed using existing scoring and tolerance
guidance.  The strategy will be issued via a management bulletin and the Risk
Sponsors Group and will be available on the council’s intranet. 
13. Next steps
13.1. The Resource Risk Management Group will continue to consult on a regular basis. 
The risk register will be reviewed on an ongoing basis by the group to ensure that
risks remain valid for the appropriate Service areas and to identify new areas of risk
that affect the Resource.  An update report will be provided to the Committee on an
annual basis. 
14. Employee Implications
14.1. Time will be required by the Resource Risk Management Group in the management
of the Resource Risk Register and Risk Control Plan. 
15. Financial Implications
15.1. There are no direct financial implications associated with the Resource’s top risks. 
There are a number of proposed risks which are classified under the heading of
financial.  Where this is the case, the appropriate controls and actions have been
included in the risk control cards and progress will be monitored. 
16.  Climate Change, Sustainability and Environmental Implications 
16.1. Sustainable development issues are included within the Council’s top risk register
through being linked directly to the Council plan objective ‘make communities safer,
stronger and sustainable’ 
17. Other Implications
17.1. Failure to demonstrate that risk is actively considered and managed cannot only lead
to avoidable financial loss but could also affect delivery of services and could affect
the Resources’ reputation. 
18. Equality Impact Assessment and Consultation Arrangements
18.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore, no impact assessment
is required. 
18.2. Consultation on the content of this report has been undertaken with the Resource
Management Team. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective and efficient  
178

Page 179

Previous References
 Report to Finance and Corporate Resources – 6 December 2023 – Update of Finance
and Corporate Resources Risk Register and Risk Control Plan 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk  
179

Page 180

Appendix 1
Finance and Corporate Resources Risk Register (as at September 2024)
Extract of risks with residual score category of Very High and High
Risk
Category
Key risk Inherent
Risk
Score
Sample of Controls Residual
Risk
Score
1
Very High
(15-25) 
The Budget Gap that the council is facing across
the medium term is the biggest risk faced by the
Council.  The Budget Gap is the result of the
continued real terms reduction in Government
funding as well as the increased demand and
increased cost of services including the
significant impact of price increases on areas
such as inflationary increases on utilities, and
increased staff costs due to pay awards. 
Reduced fees/income received by the Council
would add to budget pressures across Services 
Council Top Risk
25 • An embedded and systematic approach to
savings identification
• Robust processes in place to report annual
budget and Council Tax proposals to Elected
Members
• Council’s approved long term financial strategy 
20
The council, in conjunction with its partners, is
unable to provide the required support to
reducing the overall impact of the costs of living
crisis on households in South Lanarkshire
resulting in increasing levels of poverty, debt, and
poorer outcomes for people 
Council Top Risk
25 • Debt and money advice from the Money
Matters Advice Service
• Provision of crisis and community care grants
from the Scottish Welfare Fund
• Tenants Sustainment Fund
20
The council’s operations are affected by fraud,
theft, organised crime and cyber attacks 
Council Top Risk
25 • Anti-Fraud and Corruption Strategy
• Whistle-blowing procedures
• Cyber security and information security training
• Dissemination of fraud alerts
20
The council fails to comply with or meet the
expected standards of scrutiny and deliver the
25 • Regular communication with regulatory bodies
• Improvement plans developed and progressed
20
180

Page 181

improvement actions identified by regulatory
bodies *
Council Top Risk
Disruption to council services as a result of
industrial action
Council Top Risk
20 • National negotiations to resolve the pay issues
• Communications in place to residents affected
via social media channels
16
The council fails to comply with its statutory
duties by not conducting sufficiently robust
impact assessments where the same are
required in respect of budget/service redesign
proposals, leading to potential legal and
financial challenges, which could result in failure
to deliver those proposals *
Council Top Risk
20 • Implementation of consistent Integrated Impact
Assessment approach throughout the council 
16
The council fails meet statutory and legislative
duties in respect of public protection  
Council Top Risk
25 • Resilience response plans to respond to
disruption to community alarm service
16
The council inherits commercially unviable
shopping centres due to the financial failure of
existing owner/management companies resulting
in significant financial and operational liabilities
transferring to the council *
Council Top Risk
20 • Options appraisals undertaken
• Retention of professional expertise – property
management; legal etc.
16
2
High
(8-12)
Failure to fulfil emergency response
commitments befitting the council’s status as a
Category One (emergency) responder Council
Top Risk
25 • Media response policy
• IT business continuity plans
• Emergency Management Team
12
The council does not have the appropriate
emergency/business continuity plans;
contingency arrangements or partnerships in
25 • Range of supports in place to allow agile working
• Wellbeing Hub – counselling; CBT; online
activities
• Enhanced financial monitoring
12
181

Page 182

place to respond to/or recover from a
pandemic/endemic event.
Council Top Risk
Procurement activity is affected by supply chain
issues; a lack of resources; non-compliance or
legal challenge 
Council Top Risk
25 • Procurement Strategy and action plan
• Contracts register in place
• Procurement Network Group
12
Lack of capacity and skills to meet increased
service demands
Council Top Risk
20 • Workforce Strategy
• Performance Appraisal Process
• Learning and Development Strategy
12
Information Governance not subject to adequate
control
Council Top Risk
20 • Awareness raising
• Information Governance Group in place
• Information Governance Strategy
12
Historic childhood abuse
Council Top Risk
16 • Regular actuarial reviews of post insurance
fund exposures undertaken to establish
potential liability for the council 
12
The council is materially affected by the
implications arising from the National Care
Service Bill
Council Top Risk
16 • Reports presented to Committee
• Monitoring of progress of the Bill through the
Scottish Parliament
12
Insurance fund insufficient to meet known
liabilities and is further impacted by a failure to
implement mitigating actions
20 • Formalised approach adopted to projection
analysis
• Ongoing management of claims trends (hot spot
reviews/management reports)
12
Implications of the Scottish Fire and Rescue
Service Unwanted Fire Alarm Signals Policy
within the council's non-domestic estate
Council Top Risk
25 • Review of building evacuation plans
• Review of alarm systems to ascertain upgrade
requirements.
• Funding made available to upgrade alarm
systems
9
182

Page 183

IT development, functionality and
implementation of new systems does not
support service delivery to secure efficiencies
Council Top Risk
20 • IT Asset Management Plan
• ICT Development Fund
• IT Programme Board
9
The council fails to deliver the objectives of the
Community Wealth Building Strategy
Council Top Risk
20 • Supplier Development Programme provides
training to businesses on how to bid for
contracts
• SLC are a living wage anchor organisation
• CWB Commission and Progress Groups in place
to oversee progress and delivery of the Strategy
9
Difficulties in placing insurance cover 16 • Support from appointed insurance broker
• Sound experience in placing covers 
• Regular reviews to ensure optimal balance
between retention of risk and purchased covers
9
Loss of Administration IT Systems 12  • Able to access IT back up
• Use local drives or revert to a manual process, if
possible
• Meetings could be held in the traditional manner,
i.e. in person
9
Inaccurate information relating to council
services reported via media
12 • Timeous response to media enquiries
• Guidelines on media enquiries contained within
Corporate Standards
• Contact sheets provided to the media
9
Audit plan not delivered 12 • Managed systematic approach to work allocation
and monitoring arrangements
• Capacity planning
9
Gap in data analytical skills impacting the
development of the internal audit function.
9 • Formal strategy being developed for 2024/2025
(including a training plan).
9
Failure in delivery of election events * 15 • Early planning and timetabling of tasks 9
183

Page 184

• National performance standards met or
exceeded and reviewed regularly
Failure to ensure the health, safety and wellbeing
of employees and the protection of service users
and members of the public in the delivery of
council services
Council Top Risk
20 • Occupational Health and Safety Management
System embedded throughout the Council
• Risk assessments and safe systems of work
developed and implemented
• Resource H&S Groups in place
8
Failure to achieve the outcomes of the
Community Plan
Council Top Risk
20 • Partnership Progress Group established
• Community Engagement Manager and team in
place
• Neighbourhood plans developed 
8
Failure to achieve the outcomes of the Council
Plan
Council Top Risk
16 • New Council plan approved in June 2022 and all
plans, policies and strategies aligned with the
new priorities and outcomes across the council
• Bi-Annual performance reporting and annual
performance spotlights
8
Community Alarms - Failure to properly prepare
and successfully transition from the current
analogue service to a digital solution within the
pre-determined timescale
20 • Project plan in place
• Project Review Board established
• Sessions held to scope full organisation
requirements
8
Failure to manage financial aspects of City Deal  25 • Financial aspects reviewed for each business
case at all stages of the project
• Assurance frameworks
• Specific project risk registers in place
8
‘*’ indicates new risk added this year 
184

Page 185

Appendix 2: Comparison 2024 and 2023 council top risk register Risk Category 
Risk
Category
Key risk 2023
Residual
risk
score 
2024
Residual
risk
score
Change
in
residual
risk
scores
Other
changes
1
Very High
(15-25) 
The Budget Gap that the council
is facing across the medium
term is the biggest risk faced by
the Council.  The Budget Gap is
the result of the continued real
terms reduction in Government
funding as well as the increased
demand and increased cost of
services including the significant
impact of price increases on
areas such as inflationary
increases on utilities, and
increased staff costs due to pay
awards.  
Reduced fees/income received
by the Council would add to
budget pressures across
Services. Council Top Risk
20 20 = Amended
wording
The council, in conjunction with
its partners, is unable to provide
the required support to reducing
the overall impact of the costs of
living crisis on households in
South Lanarkshire resulting in
increasing levels of poverty,
debt, and poorer outcomes for
people. Council Top Risk
20 20 = Amended
wording
The council’s operations are
affected by fraud, theft,
organised crime and cyber
attacks. Council Top Risk
12 20  Amended
wording
The council fails to comply with
or meet the expected standards
of scrutiny and deliver the
improvement actions identified
by regulatory bodies. Council
Top Risk
- 20 New 
Disruption to council services as
a result of industrial action.
Council Top Risk
16 16 = 
185

Page 186

The council fails to comply with
its statutory duties by not
conducting sufficiently robust
impact assessments where the
same are required in respect of
budget/service redesign
proposals, leading to potential
legal and financial challenges,
which could result in failure to
deliver those proposals.
Council Top Risk
- 16 New 
The council fails meet statutory
and legislative duties in respect
of public protection. Council
Top Risk
16 16 = Amended
wording
The council inherits
commercially unviable shopping
centres due to the financial
failure of existing
owner/management companies
resulting in significant financial
and operational liabilities
transferring to the council.
Council Top Risk
- 16 New 
2
High
(8-12)
Failure to fulfil emergency
response commitments befitting
the council’s status as a
Category One (emergency)
responder. Council Top Risk
12 12 = 
The council does not have the
appropriate emergency /
business continuity plans;
contingency arrangements or
partnerships in place to respond
to/or recover from a
pandemic/endemic event.
Council Top Risk
12 12 = 
Procurement activity is affected
by supply chain issues; a lack of
resources; non-compliance or
legal challenge. Council Top
Risk
12 12 = 
Lack of capacity and skills to
meet increased service
demands. Council Top Risk
9 12  
186

Page 187

Information Governance not
subject to adequate control.
Council Top Risk
12 12 = 
Historic childhood abuse.
Council Top Risk
12 12 = 
The council is materially
affected by the implications
arising from the National Care
Service Bill. Council Top Risk
12 12 = 
Insurance fund insufficient to
meet known liabilities and is
further impacted by a failure to
implement mitigating actions
12 12 = 
Implications of the Scottish Fire
and Rescue Service Unwanted
Fire Alarm Signals Policy within
the council's non-domestic
estate. Council Top Risk
16 9  
IT development, functionality
and implementation of new
systems does not support
service delivery to secure
efficiencies. Council Top Risk
9 9 = Amended
wording
The council fails to deliver the
objectives of the Community
Wealth Building Strategy.
Council Top Risk
16 9  
Difficulties in placing insurance
cover
9 9 = 
Loss of Administration IT
Systems
9 9 = 
Inaccurate information relating
to council services reported via
media
9 9 = 
Audit plan not delivered 9 9 = 
Gap in data analytical skills
impacting the development of
the internal audit function.
9 9 = 
Failure in delivery of election
events 
4 9  
Failure to ensure the health,
safety and wellbeing of
employees and the protection of
service users and members of
the public in the delivery of
8 8 = 
187

Page 188

council services. Council Top
Risk
Failure to achieve the outcomes
of the Community Plan. Council
Top Risk
8 8 = 
Failure to achieve the outcomes
of the Council Plan. Council
Top Risk
8 8 = 
Community Alarms - Failure to
properly prepare and
successfully transition from the
current analogue service to a
digital solution within the pre-
determined timescale
8 8 = 
Failure to manage financial
aspects of City Deal
8 8 = 
188