Democracy Spraffa

Agenda Document Pack - Performance and Review Scrutiny Forum - 29/11/2022

South Lanarkshire Council · 29 November 2022
Back to Performance and Review Scrutiny Forum — 29 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 21 November 2022 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 29 November 2022
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Joe Fagan (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers, Maureen
Devlin, Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
16 August 2022 submitted for approval as a correct record.  (Copy attached) 
3 - 8 
Item(s) for Consideration 
3 Council Plan Connect 2022/2027 - Quarter 2 Progress Report 2022/2023
Report dated 16 November 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
9 - 34 
4 Resource Plans - Red and Amber Results at Quarter 2, 2022/2023
Report dated 14 November 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
35 - 42 
5 Audit Scotland Report - Local Government in Scotland Overview 2022
Report dated 16 November 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
43 - 60 
6 Best Value Assurance Reports (BVAR) Published by the Accounts
Commission
Report dated 17 October 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
61 - 70 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 16 August 2022 
Chair:
Councillor Joe Fagan 
Councillors Present:
Councillor Gerry Convery (Depute), Councillor Andrea Cowan (substitute for Councillor Maureen
Chalmers), Councillor Maureen Devlin, Councillor Katy Loudon, Councillor Davie McLachlan,
Councillor Kirsten Robb 
Councillors’ Apologies:
Councillor John Anderson, Councillor Maureen Chalmers, Councillor Richard Lockhart, Councillor
John Ross 
Attending:
Chief Executive’s Service
C Sneddon, Chief Executive
Community and Enterprise Resources
T Finn, Planning and Building Standards Manager (Headquarters); C Park, Head of Roads,
Transportation and Fleet Services
Education Resources
D Dickson, Education Operations Manager
Finance and Corporate Resources
P Manning, Executive Director; S Somerville, Administration Manager; T Little, Head of
Communications and Strategy; K McLeod, Administration Assistant; S McLeod, Administration
Officer; N Reid, Improvement and Community Planning Manager; M Gordon, Administration
Assistant
Health and Social Care/Social Work Resources
I Beattie, Head of Health and Social Care (Hamilton and Clydesdale) 
1 Declaration of Interests 
No interests were declared. 
2 Council Plan Connect 2017 to 2022 - Quarter 4 Progress Report 2021/2022 
A report dated 1 August 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on the progress of ‘Connect’, the Council Plan 2017 to 2022, at the Quarter 4 Stage of
2021/2022. 
‘Connect’ detailed the Council’s vision, values, ambitions and objectives to be delivered in the 5
year period of the Plan.  Progress made on key objectives was summarised in the report.  Of the
108 measures nominated for reporting against the Plan:- 
 16 projects had been completed
 73 had met their timescale or target as per expectations
 11 had minor slippage against timescale or minor shortfall against target
 2 had major slippage against timescale or major shortfall against target
 6 were contextual or would be reported on at a later stage  
2
3

Page 4

A summary of the key achievements against each of the 4 ‘Connect’ priorities was contained in
the report and the ‘Connect’ Performance Report for Quarter 4, 2021/2022, covering the period
to the end of March 2022, was attached as Appendix 1 to the report. 
To aid scrutiny, a further analysis had been introduced, with any measures that had changed
status between Quarters 2 and 4 being highlighted and an explanation provided for the change
of status.  Of the 108 measures, 27 had changed status between Quarters 2 and 4 with 9
measures showing a decline in performance, mainly due to the COVID-19 pandemic, and 18
measures showing an improvement in performance.  A list of those measures was attached as
Appendix 2 to the report. 
Officers responded to members’ questions on various aspects of the report. 
The Forum decided: 
(1) that the ‘Connect’ Quarter 4 Progress Report 2021/2022, summarised in the report and
attached as Appendix 1 to the report, be noted; 
(2) that the summary of the Council’s key achievements against each of the 4 ‘Connect’
priorities, for the period 1 April 2021 to 31 March 2022, be noted; and 
(3) that the additional scrutiny of changes in measure status between Quarter 2 and Quarter 4,
summarised in the report and attached as Appendix 2 to the report, be noted. 
[Reference:  Minutes of 17 August 2021 (Paragraph 4)] 
Councillor McLachlan joined the meeting after this item of business 
3 Local Government Benchmarking Framework 2020/2021 Results and Action Plan 
A report dated 27 June 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on the Scottish Local Government Benchmarking (LGBF) results for 2020/2021. 
The LGBF compared spend/cost, performance and customer satisfaction results over several
years and between similar councils.  It comprised a number of performance indicators across a
range of services. 
Due to the COVID-19 pandemic, the Council had been forced to suspend or reduce a number of
services in order to comply with government advice.  In addition, the Council had been required
to redirect resources to deliver vital new services to support individuals, communities and
businesses and there had been an inevitable impact on performance in some areas. 
Information on the Council’s LGBF data and results for 2020/2021, together with comparative
data for 2019/2020 and 2018/2019, was provided in Appendix 1 to the report.  This information
also showed whether the Council’s performance in 2020/2021 had improved, remained the same
or declined compared to the previous year and how the Council’s performance compared with
the Scottish average. 
The impact of the COVID-19 pandemic had affected data collection for some indicators, notably
in education, details of which were provided in the report.  
4

Page 5

Although the LGBF results were available for all councils in Scotland and could be used to
construct league tables, the Local Government Improvement Service (LGIS) cautioned against
this approach and emphasised that the purpose of the data was to open discussion about
performance and improvement in the context of specific services whilst taking account of
geography, demographics and local council priorities.  It was, therefore, important to pay attention
to the narrative against each indicator when forming a judgement on what the performance meant
in a South Lanarkshire context. 
At a local level, each council was required to publish its results at the same time as the publication
of the national results by the LGIS.  The LGIS would continue to:- 
 review and develop indicators
 hold benchmarking events where local authorities could share good practice 
Officers responded to members’ questions on various aspects of the report. 
On a point raised regarding whether visits to leisure facilities referred only to physical visits or
included virtual visits, officers undertook to provide the information requested to the members. 
The Forum decided: 
(1) that the importance of viewing LGBF measures in the local context, as detailed in the report,
be noted; 
(2) that the results, narrative, actions and family group analysis identified following scrutiny of
the results for 2020/2021 be noted; 
(3) that it be noted that the Council’s LGBF results and explanatory narrative for 2020/2021 had
been published on the Council’s website, to coincide with the publication of the national
results by the Local Government Improvement Service; and 
(4) that the developments and events being undertaken by the Local Government Improvement
Service/LGBF Board be noted. 
[Reference:  Minutes of 18 May 2021 (Paragraph 3)] 
4 Local Government Benchmarking Framework Update 
A report dated 21 July 2022 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on engagement with the Local Government Improvement Service
(LGIS) regarding the Local Government Benchmarking Framework (LGBF) and its future use. 
Following the update provided to this Forum at its meeting held on 26 October 2021, in December
2021, the LGIS provided a bespoke analysis of LGBF indicators for the Council, structured around
the emerging key themes contained in the new Council Plan for 2022 to 2027. 
The aim of the analysis had been to look at the LGBF indicators more thematically and
strategically.  Resources had been asked to review the LGIS analysis in tandem with work on the
new Council Plan for 2022 to 2027 and consider which LGBF indicators added value and would
be the best candidates for inclusion in a subset of indicators for future reporting.  The resultant
draft suite of indicators, attached at Appendix 1 to the report, identified 33 of the 95 LGBF
indicators for inclusion within the reporting arrangements for the Council Plan. 
Discussions with the LGIS had also highlighted the importance of how and when progress against
the indicators was reported and identified barriers to using the LGBF for effective scrutiny, enquiry
and learning which were detailed in the report. 
5

Page 6

This suggested that a best practice approach placed an emphasis on considering LGBF
indicators in a more integrated and thematic way alongside other performance reporting.  This
would enable the LGBF to be seen in an appropriate context alongside or in the course of strategic
decision-making and scrutiny.  Consequently, the draft strategic suite of LGBF indicators,
included at Appendix 1 to the report, would form part of the reporting arrangements for the new
Council Plan for 2022 to 2027 and would appear alongside other measures relevant to the
achievement of the 6 outcomes contained in the Plan. 
To complement the reporting of this draft strategic suite of LGBF indicators, additional work would
be undertaken to map the LGBF indicators across the Council’s reporting arrangements to identify
where LGBF might be included within other reporting streams where there would be more context
and other indicators.  The aim of this exercise would be to find a “home” for the LGBF indicators
in the Council’s routine reporting so that they could be reported in the most suitable context and
alongside other appropriate information and narrative content. 
As part of this exercise, the Public Performance Reports (PPRs) on the Council’s website would
be reviewed to identify where LGBF indicators could usefully be included.  The PPRs were
updated annually and were provided as part of the Council’s commitment to balanced and
accessible performance reporting as required by Best Value legislation.  This would enhance the
visibility and relevance of the LGBF in the Council’s public performance reporting. 
The conclusion of this work with the LGIS would ensure that the Council’s LGBF indicators were
embedded across its reporting arrangements, with a strategic focus on those indicators which
were most relevant to the Council’s priorities, strengthening opportunities to scrutinise the LGBF
and enhance its role in the Council’s public performance reporting. 
Further work would be undertaken with the LGIS and a report would be submitted to a future
meeting of the Forum after the conclusion of this work to:- 
 refine and finalise the draft strategic suite of indicators for use in conjunction with the
reporting of the new Council Plan for 2022 to 2027
 investigate routes by which LGBF indicators could be embedded into routine reporting by
mapping indicators to potential reporting routes 
The Forum decided: 
(1) that the engagement with the LGIS on the use of the LGBF be noted; 
(2) that the draft suite of indicators aligned with Council Plan outcomes, as detailed in the report
and attached as Appendix 1 to the report, be noted; 
(3) that it be noted that further work would be undertaken to map LGBF indicators to reporting
routes which placed them in an appropriate setting and scrutiny context; and 
(4) that it be noted that a report on the conclusion of this work with the LGIS would be submitted
to a future meeting of the Forum. 
[Reference:  Minutes of 26 October 2021 (Paragraph 3)]  
6

Page 7

5 Annual Performance Spotlights 2021/2022 
A report dated 12 July 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on the Annual Performance Spotlights for 2021/2022. 
At its meeting on 4 September 2018, the Forum had considered a report which set out plans to
review the Annual Performance Report (APR) element of the Council’s public performance
reporting (PPR) approach.  Consequently, a new approach had been developed which replaced
the APR document with Annual Performance Spotlights (APS).  The APS provided “bite sized”
web content performance information for each objective contained in ‘Connect’, the Council Plan,
together with the theme Delivering the Plan and Achieving Best Value.  Each APS consisted of:- 
 a case study
 a selection of infographics
 links to other related material 
The infographics contained in the 2021/2022 APS were attached as Appendix 1 to the report.  In
response to points raised by the Accounts Commission in the Council’s Best Value Assurance
Report (BVAR) 2019, the 2021/2022 APS had been improved by:- 
  including, for each infographic, trend information with a clear indication as to whether
performance had improved and if the target had been met
 providing a link, directly below the infographic on the website, to supporting data, further
reports or more detailed information 
A suite of public performance reports, focusing on key areas of Council business, would continue
to be prepared to complement the APS.  The format of the APS would be reviewed on an ongoing
basis to ensure the documents kept pace with public expectations, Audit Scotland’s requirements
in respect of public performance reporting, continuous improvement and Best Value, the
Accounts Commission’s Direction 2021 and the Council Plan for 2022 to 2027.  The APS for
2021/2022 would become live on the Council’s website in September 2022, significantly in
advance of the statutory deadline of 31 March 2023. 
The Forum decided: that the report and the content of the Annual Performance
Spotlights 2021/2022 be noted. 
[Reference:  Minutes of 17 August 2021 (Paragraph 3)] 
6 Urgent Business 
There were no items of urgent business. 
7

Page 8

8

Page 9

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 29 November 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council Plan Connect 2022/2027:
Quarter 2 Progress Report 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
• provide the Council Plan Connect Quarter 2 Progress Report 2022-23, for the
period 1 April 2022 to 30 September 2022
[1purpose]
2. Recommendations
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the Connect Quarter 2 Progress Report 2022-23 summarised at paragraph
4.5. and attached as Appendix 1 of this report, be noted;
(2)  that the key achievements, as detailed in paragraph 4.6. and 4.7. of this report
be noted; and
(3)  that the additional scrutiny of reporting the updated status of those measures
identified as ‘report later’ as at Quarter 4 2021-22 as summarised at paragraph
4.8. of this report, be noted. 
[1recs]
3. Background
3.1. The Council Plan Connect covering the period 2022-27 was approved by South
Lanarkshire Council at its meeting on 15 June 2022.  The Plan sets out the Council’s
vision, values, priorities and outcomes for the five year period. 
3.2. As part of the performance reporting arrangements introduced in 2007, it was agreed
that progress reports on the Council Plan would be provided at the mid-year point
(Quarter 2) and at the end of the financial year (Quarter 4).   
3.3. As the Forum is aware, from March 2020 onwards at times, the Council was forced to
suspend or reduce a number of services that could not be continued in full due to the
Covid pandemic. The Council was also obliged to redirect resources so that it could
deliver vital new services and supports for individuals, communities, and businesses.
Despite the return of services through the Council’s Recovery Plan there is a Covid
legacy in terms of a residual impact on some services and a significant build-up of
demand, as a result of which there remains an inevitable impact on performance in
some areas. 
4. Quarter 2 Progress 2022-23
4.1. The Council Plan offers flexibility, both at the Resource level and from one year to the
next, in the choice of actions and measures required to deliver the Council’s priorities. 
Alongside this flexibility, however, comes the requirement to ensure that the golden
thread from Council Plan to Resource Plan remains unbroken. 
3
9

Page 10

4.2. The reporting framework for the Council Plan identifies key measures within Resource
Plans which are taken and combined in a Connect report to provide a balanced picture
of council performance against Connect outcomes. 
4.3. A total of 234 measures have been identified from the 2022-23 Resource Plans.  Of
those, 66 (28%) have been nominated as key strategic measures for reporting
progress against Connect. 
4.4. Progress to date against all measures is contained in the Connect Quarter 2
Performance Report 2022-23, attached as Appendix 1.  This report has been produced
from the Council’s performance management reporting system IMPROVe, and uses a
traffic light format with the following definitions to give a status report on each
measure:- 
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when
available
Contextual Included for ‘information only’, to set performance information in
context 
4.5. To ensure adequate scrutiny of performance across all Resources, individual Resource
Committees receive details of all ‘red’ measures relating to that Resource including
management actions, where applicable. In addition, the Forum may consider those
measures across all Resource Plans reporting a ‘red’ and/or ‘amber’ status. 
The overall summary of Connect progress to date is as follows and performance
should be considered in the context of the impact of responding to Covid 19:- 
Status Measures
Statistical  Project  Total %
Blue N/A 2 2  3%
Green  18 28 46 70%
Amber  3 3 6  9%
Red     1 0 1  1%
Report later/Contextual 10 1 11  17%
Totals  32 34 66 100 %                      
(Data correct as at 13 October 2022) 
4.6. Progress for the period ending Quarter 2, 2022-23 on each of the six Connect
Outcomes and the related achievements has been summarised in the following tables:-  
10

Page 11

4.6.1.
Connect
Outcome
Communities and Environment 
Number of
measures
Blue Green Amber Red Report later Total
1 8 1 1 2 13
Achievements The Roads, Transportation and Fleet Service was successful in winning the
award for ‘Most Effective in Road Safety, Traffic Management and Enforcement’
at the Scottish Transport Awards which were held at the Radisson Blu Hotel in
Glasgow on 29 September 2022.
A comprehensive five year Litter Strategy for South Lanarkshire was approved
by the Climate Change and Sustainability Committee in August 2022. The
Strategy outlines how the Council, its partners, and the wider community can
tackle the issues.
The new Sustainable Development and Climate Change Strategy was approved
by the Climate Change and Sustainability Committee in June 2022. The Strategy
was prepared following extensive public engagement and builds on the
successes of the previous strategy. The mission statement of the new Strategy
is: Our Future is Now: building a sustainable, climate resilient and net-zero
South Lanarkshire together, in a fair and inclusive way
On 13 July 2022, Justice Services participated in an Adult Support and
Protection World Café Event with a variety of care homes.  This included a
presentation on Multi-Agency Public Protection Arrangements (MAPPA)
procedures as they relate to care homes, with a particular focus on
Environmental Risk Assessments to enhance knowledge of care home workers
to risk assess service users, subject to MAPPA, who require residential care.  It
also involved a Q&A with care home staff. 
4.6.2.
Connect
Outcome
Education and Learning
Number of
measures
Blue Green Amber Red Report later Total
1 0 0 0 4 5
Achievements Scottish Education Awards 2022: The Making a Difference (Primary) Award was
won by Netherburn Primary School. The award is for a primary school, or other
establishment, (e.g. special school or all-through school), that can demonstrate
its effectiveness in transforming the life chances of the children and young
people which it serves.
Scotland’s Enterprising Schools Awards 2002: The Most Enterprising School
Awards was won by Strathaven Academy. Awarded in response to the great
work being done across the entire school to celebrate enterprise and ensure that
enterprise is becoming embedded into the curriculum as standard.
Developing Literacy: 770 people attended two family orientated events at Lanark
Loch and Overtoun Park, Rutherglen to mark this year’s International Literacy
Day – Transforming Literacy Learning Spaces.
The adult literacy team provided a range of literacy-based learning activities to
help support adults and children’s learning. 
4.6.3.
Connect
Outcome
Health and Wellbeing
Number of
measures
Blue Green Amber Red Report later Total
0 12 0 0 1 13
Achievements The annual progress report which summarises all the actions taken in terms of
air quality has been submitted to Scottish Government and positive responses
have been received from Scottish Government and SEPA. The Air Quality Action
Plan measures are ongoing including Eco Stars, Walkcycle4air, Love to Ride
11

Page 12

South Lanarkshire, engine idling campaign works, vehicle emission testing and
Beat the Street East Kilbride.
Care Facilities Modernisation Programme: Work is progressing well on our new
care campus in Blantyre, 19 out of the 20 technology enabled properties are now
occupied with the last property being handed over mid-October due to further
adaptations being made.
New governance arrangements between South Lanarkshire Council and South
Lanarkshire Leisure and Culture Ltd were approved at the South Lanarkshire
Council meeting on 15 June 2022.
Nurturing mental health: the power of positive relationships conference in
September provided schools with a range of supports that are available to them
in terms of Mental Health guidance and resources designed to help young
people. 
4.6.4.
Connect
Outcome
Children and Young People
Number of
measures
Blue Green Amber Red Report later Total
0 3 0 0 2 5
Achievements Corporate Parenting: A dedicated young person’s service has been established
for young people in conflict with the law who are aged 12-18 years. This service
promotes age-appropriate responses and child centred responses for children
who may pose a risk of harm to others. A pan-Lanarkshire pilot targeting young
people who are jointly reported to be retained within the children’s hearing
service where possible is commencing in November 2022.
Scottish Education Awards 2022: South Lanarkshire Council Education
Resources won the Community Learning and Development Award for the
Mobilize Music Project run by our Youth Family and Community Learning
Service. The award recognises and celebrates the integral contribution of CLD to
improving the educational outcomes and life chances of our children and young
people.
GTCS - Excellence in Professional Learning Award for Schools and Learning
Communities: Larkhall Academy and St Andrew’s and St Bride’s High School
achieved the General Teaching for Scotland, Excellence in Professional
Learning Award and Quality Mark status. This award celebrates and recognises
schools and learning communities that support and lead professional learning
which has a significant and sustained impact on teachers, classroom practice
and learners. 
4.6.5.
Connect
Outcome
Housing and Land
Number of
measures
Blue Green Amber Red Report later Total
0 10 2 0 2 14
Achievements In June 2022 work with residents of the Council’s Gypsy/Traveller sites was
recognised at a national level with the award of the Municipal Journals
“Innovation in Building Diversity and Inclusion Award” 
The draft Local Housing Strategy 2022-27 was developed in conjunction with
partners, with consultation running through to the end of October 2022. 
4.6.6.
Connect
Outcome
Our Economy
Number of
measures
Blue Green Amber Red Report later Total
0 8 3 0 0 11
Achievements The first face-to-face ‘Lanarkshire Women in Business’ event was held in June
2022, with more than 70 local businesses attending the event at the Strathaven
12

Page 13

Hotel. A follow up event was held at the Excelsior Stadium in August 2022.
Lanarkshire Women in Business events are targeted to aspiring and existing
business women as well as those working in business seeking personal and
professional development.
The Blantyre Town Centre Strategy and Action Plan was approved at
Community and Enterprise Resources Committee on 4 October 2022. 
4.7. In addition to working towards the six Connect Outcomes, the Council will continually
aim to improve and ensure effective and efficient use of resources, and that business
will be conducted with integrity and transparency and will operate to the highest
standards.  In order to monitor and report progress against these values, Resource
Outcomes have also been identified, under the heading Delivering the Plan and
achieving Best Value. Progress on this and the related achievements have been
summarised in the following table:-   
Delivering the Plan and achieving Best Value 
Number of
measures
Blue Green Amber Red Report later Total
0 5 0 0 0 5
Achievements Contract negotiations are now complete in relation to the Social Care Case
Management system, with Liquidlogic being awarded the contract.  The project
is now progressing to the implementation stage and a Project Plan has been
established and presented to the Project Review Board.  To date, all milestones
remain on track.    
Upgraded Audio Visual systems within the Council Chambers.
Refreshed network equipment across the schools’ estate
During the period 1 April to 30 September 2022, Council employees completed
59,196 eLearning modules. 
In the same period, 3,751 employees attended 665 classroom-based events,
and 1,053 employees attended 112 virtual online events. 
4.8. Report later/contextual
Measures in the quarterly progress reports which are not red, amber or green can be
assigned a status of ‘report later’ or ‘contextual’. Of the 6 measures identified in these
categories at Quarter 4 2021-22, 4 are contextual measures, for which figures were
provided in the Q4 report. One indicator is part of the Local Government Benchmarking
Framework (LGBF) suite, for which the 2021-22 results will not be published until
February 2023. The final measure relates to the 3 year business survival rate – the
Office of National Statistics publish this and the most recent results relate to 2017-20.
No further action is required. 
5. Employee Implications
5.1. The priorities noted within the Council Plan inform the Resource Plans and in turn the
Performance Appraisal process for individual employees. 
6. Financial Implications
6.1. Provision for meeting the Council Plan’s outcomes is reflected in both the Revenue and
Capital budgets, and longer term, within the framework of the Council’s approved
Financial Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising from
this report  
13

Page 14

8. Other Implications
8.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Equality Impact Assessments will be undertaken in line with the various actions within
Connect as appropriate. 
9.2. Many of the priorities, outcomes and actions detailed within the plan reflect ongoing
work programmes implemented to address local and national priorities.  Extensive
consultation, therefore, has already taken place in relation to a significant proportion of
the priorities, outcomes and actions outlined in the plan.   
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 The Council Plan 2022-27 reflects the overarching vision of South Lanarkshire Council
and details its values, priorities and outcomes, including links to the Community Planning
Partnership 
Previous References
 Performance and Review Scrutiny Forum 16 August 2022 - Connect Quarter 4 Progress
Report 2021-22 
List of Background Papers
 Council Plan Connect 2022-27: approved by South Lanarkshire Council on 15 June 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext: 4904  (Phone: 01698 454904)
E-mail: tom.little@southlanarkshire.gov.uk 
Performance: www.southlanarkshire.gov.uk/performance       
14

Page 15

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 13 Oct 12:25
Quarter 2 : April 2022 - September 2022
(This represents the cumulative position to September 2022)
Performance Report 2022-23
South Lanarkshire Council
Connect
3
15

Page 16

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 13 Oct 12:25
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome / Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 1 1 1 2 5
Education and Learning 0 0 0 4 4
Health and Wellbeing 8 0 0 1 9
Children and Young People 2 0 0 2 4
Housing and Land 3 1 0 1 5
Our Economy 3 1 0 0 4
Delivering the plan and achieving best value 1 0 0 0 1
Total 18 3 1 10 32
Page 1
16

Page 17

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Make an annual saving from using
recycled items as opposed to new through
the joint store
The cumulative total for recycled equipment for Period 1 to 6 (excluding
stairlift and tracking) was:
No of items - 941
Cost of items - £64,216
Value of items - £161,485
Since April 2022 there has been a saving for the Council of £97,269 to
meet annual saving target of £175,000.
The P6 data for stairlift and tracking is unavailable at this time, however
updates will be made as soon as this information available.
Green 175,000 97,269 ------ ------ 267,296
Land Audit Management System grounds
maintenance score
LAMS measures the quality of grounds maintenance based on surveys
which are completed throughout the year. Taking the scores to date (68,
73, 72 and 71), our current overall score is 71. This is slightly below
target, however we still have one additional inspection to carry out.
Amber 72.0 71.0 72.0 72.0 71.3
Percentage of our road network that should
be considered for maintenance treatment
This figure is derived from the Society of Chief Officers of Transportation
in Scotland (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target figure of 29.7% is based on the results for the period
2020-22.
The RCI for 2021-23 will be published in January 2023.
Report Later 29.7% ------ 30.3% 30.6% 29.7%
Page 2
17

Page 18

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Reduction in the council’s carbon
emissions achieved by March 2023
(buildings, waste, street lighting, transport)
The results for financial year 2022-23 will be reported in July 2023.
The results for financial year 2021-22 were calculated and reported to
CMT in August 2022. It was reported that the council's carbon emissions
reduced by 17% compared with baseline year 2019-20. This is partly
due to the continued service disruption throughout the year due to
Covid, reductions in national carbon conversion factors and reduced
amounts of household waste going to landfill.
Report Later 5.0% ------ 44.0% 19.0% 17.0%
Percentage of total household waste that is
recycled in 2022
Measure is reported per calendar year. The figure for quarter two (April
to June 2022) was 45.07%. This equates to 40.28% for the year to date
(2022). This is below the 2021 figure of 41.50%, and remains below the
target figure of 50.00%.
Higher residual waste tonnages collected at the kerbside due to
Covid-19 and home-working, high residual waste content in bulk uplifts
(black bag waste accepted), and more non-recyclable waste being
disposed of in Household Waste Recycling Centres, are all factors that
need to be taken into account when understanding the household waste
recycling performance.
A new contract is now in place for bulky waste (from 1 April 2022), and
this has increased the amount of bulky waste being recycled. Previous
contract only managed approximately 15%. The first 3 months of the
new contract have seen 50% of this waste recycled.
Red 50.00% 40.28% 46.40% 40.50% 41.50%
Education and Learning
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Improve the attendance of children and
young people at primary school
Report to be provided at Quarter 4. Report Later 90.0% ------ 94.9% 94.3% 94.6%
Improve the attendance of children and
young people at secondary school
Report to be provided at Quarter 4. Report Later 88.0% ------ 91.4% 91.0% 90.5%
Page 3
18

Page 19

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
Education and Learning
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of pupils entering positive
destinations
Report to be provided at Quarter 4. Report Later 95.7% ------ 95.7% 94.8% 96.2%
Percentage gap between pupils from the
least and most deprived areas entering
positive destinations
Report to be provided at Quarter 4. Report Later 5.8% ------ 2.7% 4.3% 6.4%
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
No of households currently waiting for
adaptations to their home
Target achieved. Green 0 0 0 0 0
% of approved applications for adaptations
completed in year (SSHC)
All adaptations were approved, this measure is demand led. Green 100.00% 100.00% 100.00% 100.00% 100.00%
% of standard adaptations to council
houses within agreed appointment times
Target achieved. Green 90.0% 96.2% 85.6% 92.4% 98.3%
% of new build that meets needs of older
people
To be reported at year end. Report Later ------ ------ ------ ------ 20.0%
Percentage of clients first seen within two
working days of a DTTO commencing
In quarter 2 there was 1 Drug Treatment and Testing Order commenced,
which was seen within two working days of the DTTO commencing.
To date 100% (5 out of 5) of clients were first seen within two working
days of a DTTO commencing.
Green 95.0% 100.0% 100.0% 100.0% 100.0%
Percentage of drug/alcohol clients starting
treatment/ psychological intervention within
three weeks of referral
In quarter 2 there were 133 referrals, 129 (97%) of these referrals
started their treatment within 3 weeks of referral.
To date there have been 270 referrals made to the service with 252
(93%) of cases, have started their treatment within 3 weeks of referral.
Green 90% 93% 94% 97% 96%
Page 4
19

Page 20

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of Criminal Justice Social
Work reports submitted to Court by the due
date
In quarter 2 98% (432 out of 441) of Criminal Justice Social Work
Reports were submitted to the court by the due date.
To date 98% (793 out of 807) of Criminal Justice Social Work reports
were submitted to Court by their due date.
Green 95.0% 98.0% 98.0% 97.0% 99.0%
Percentage of statutory supervising officer
visits completed within timescale for local
authority welfare guardianship orders
To date there were a total of 118 local authority welfare guardianship
visits due with 93% (110) being completed on time.
In quarter 2, there were a total of 61 local authority welfare guardianship
visits due with 92% (56) being completed on time.
Green 90% 93% 93% 93% 94%
Percentage of statutory supervising officer
visits completed within timescale for private
welfare guardianship orders
To date there were a total of 1281 private welfare guardianship visits due
with 93% (1185) being completed on time.
In quarter 2, there were a total of 702 private welfare guardianship visits
due with 91% (638) being completed on time.
Green 90% 93% 86% 94% 95%
Children and Young People
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of reports submitted to the
Children’s Reporter within agreed
timescales
In quarter 2, 68% (52 out of 76) reports were submitted to the Scottish
Children's Reporters Administration within agreed timescale.  Staff
sickness absence has resulted in SCRA reports having to be
re-allocated. Reduced numbers of experienced staff and vacancies
within the service is impacting on workstreams such as SCRA deadlines
as other areas of work such as CP must be prioritised. To date, 75%
(141 out of 187) reports have been submitted within timescales.
Green 75.0% 75.0% 71.0% 88.0% 82.0%
Report the number of young carers
supported by Action for Children on a
quarterly basis to Senior Management
Team
At time of recording the Q2 report (July – September) from Action for
Children was in preparation, data will be provided once this is available.
Report Later ------ ------ ------ ------ 2,021
Page 5
20

Page 21

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
Children and Young People
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Reduce the gap for positive destination
outcomes for care experienced young
people
Report to be provided at Quarter 4. Report Later 6.2% ------ 4.1% 9.1% 6.2%
Percentage of our looked after children and
young people accommodated in residential
placements
As at September 2022, 784 children are looked after, 82 (10%) of these
children are looked after in a residential setting  including local authority
houses, secure accommodation and residential schools.  This position
has been consistent since 1 April 2021.
Green 10.0% 10.0% ------ ------ 10.0%
Housing and Land
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of lets to Urgent housing (UH) need
households
Target achieved. Green 55.0% 55.6% 51.4% 61.1% 53.5%
% of new tenancies sustained for more
than a year  for all lets (SSHC)
Positively, performance is above target and anticipated this will continue
over the remainder of the year.
Green 88.00% 93.20% 90.08% 91.90% 93.40%
% of Housing Options interventions where
Homelessness prevented
Performance currently below target but is anticipated to improve as the
year progresses.
Amber 70.0% 65.5% ------ ------ 73.5%
% of response repairs completed on time Target achieved. Green 90.0% 99.3% 96.0% 97.7% 99.1%
% of council dwellings that are Energy
Efficiency Standard for Social Housing 2
(EESSH2)
To be reported at year end. Report Later ------ ------ 93.39% 93.88% 98.64%
Our Economy
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of unemployed people supported
via council-operated employability
programmes
This is Q1 new engagements April to June 2022. Employability
Reporting is quarterly in arrears
Green 1,200 442 1,322 1,348 1,934
Page 6
21

Page 22

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 13 October 2022
Council Plan Performance Indicators
Our Economy
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of unemployed people accessing
further Council Wide or training
Numbers are lower than expected, however overall target will be met
with expected increased levels reported in the next quarter update. This
is for Q1 performance April to June. Employability reports quarterly in
arrears.
Amber 200
people
13 people 568 people 211 people 219 people
Number of jobs created or sustained per
annum as a direct result of Economic
Development intervention
325 jobs created. This includes jobs created and safeguarded on
projects that have been awarded a Business Recovery and Growth
Grant.
On target to achieve by year end.
Green 500 325 943 ------ 1,095
Number of unemployed people gaining
sustainable employment
This is Q1 job entries. Employability reporting is quarterly in arrears. Green 600 86 713 410 1,146
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2020/21 2021/222019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Factoring collection rate It is important to note that the collection target is 75% by year end.  It is a
progressive target and the collection rate will increase each quarter.   At
the end of quarter 2 we are around where we would expect to be YTD
with two quarters to go.
Green 75.00% 48.30% 78.10% 74.06% 73.00%
Page 7
22

Page 23

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome / Theme Complete Green Amber Red Report later Total
Communities and Environment 1 7 0 0 0 8
Education and Learning 1 0 0 0 0 1
Health and Wellbeing 0 4 0 0 0 4
Children and Young People 0 1 0 0 0 1
Housing and Land 0 7 1 0 1 9
Our Economy 0 5 2 0 0 7
Delivering the plan and achieving best value 0 4 0 0 0 4
Total 2 28 3 0 1 34
Page 8
23

Page 24

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Implement the
improvement actions
from the South
Lanarkshire Community
Learning and
Development Plan
2021-2024 in line with
the CLD Regulations
and Strategic Guidance
to improve outcomes for
local communities
Implement the improvement actions of the South Lanarkshire
Community Learning and Development Plan 2021-2024 to
improve outcomes for local communities
South Lanarkshire’s Community Learning & Development Plan was
published in October 2021 by the CLD Partnership that comprises a
range of partner organisations including South Lanarkshire Council,
third sector, further and higher education, and agencies such as SDS,
DWP and Health Improvement. Although led and coordinated through
the local authority this is very much a partnership plan. Partners are
progressing well in relation to the 6 priorities: Access to Learning,
Health and Well-being, Progression, Employability, Community
Influence, and Workforce Development. An agreed data set has been
developed and partners are currently being supported in how to
compile this information or use current data sets that they routinely
compile to feed into the outcomes for the plan. An interim report will be
written in November 2022 that will outline impacts and outcomes, key
strengths, and areas for improvement moving forward.
Green
Increase routes for
communities to
participate in decision
Monitor and develop the bespoke locality planning
partnership in each of the four localities
Two partnerships established, chairs in place and chairs have joined
the CPP Board. Two partnerships in development, and dialogue
happening with the groups who will be invited to join them.
Green
making and priority
setting
Develop a comprehensive set of neighbourhood planning
structures across all identified priority communities in South
Lanarkshire
Stakeholder groups in place in all communities with current
neighhourhood plans.
Green
Page 9
24

Page 25

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Support communities and Resources in the roll out of a 1%
mainstream participatory budgeting process
Support given to resources for PB in roads and street cleaning
services. Support given to communities to engage.
Green
Community Safety
priorities including
relevant parts of the
SLCP are achieved
The Resource will administer a review of the safer South
Lanarkshire Board and associated structure during 2022/23.
This will aim to ensure reporting requirements around police
and fire scrutiny, anti-social behaviour and community justice
remain appropriate alongside links to revised community
planning priorities
A review of the Safer South Lanarkshire Board is currently underway
as a result a similar review of the Community Planning Partnership and
publication of a new 10-year Community Plan. An overview of the
existing structure, representation, and arrangements was presented at
the first meeting of the new Board in September 2022. It is proposed
that the Board focuses on three key statutory functions: scrutiny of
police and fire services, including review of performance against local
police and fire plans; reporting and monitoring of council and police
statutory duties relating to anti-social behaviour; and reporting of
community justice activity. Board members will be consulted on their
views of the proposal, and a draft Terms of Reference will be issued to
Board members.
Green
Lead by example and
influence area-wide
climate change and
sustainability action
Finalise the new Sustainable Development and Climate
Change Strategy (2022-27) for approval alongside the new
Council Plan in June 2022
The new Sustainable Development and Climate Change Strategy
(2022-27) has been finalised and was approved at Full Council in June
2022. It was also noted at the Climate Change and Sustainability
Committee in August 2022.
Complete
Page 10
25

Page 26

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Develop new Litter
Strategy (2022-27) to
promote the new Code
of Practice on Litter and
Refuse (COPLAR), with
particular emphasis on
prevention
Develop final Litter Strategy for approval by Climate Change
and Sustainability Committee in September 2022
The Litter Strategy was approved by the Climate Change and
Sustainability Committee on 31 August 2022. The document is
currently with design to develop the front cover for an accessible Open
Document Text version, along with the design work for a print version.
The Litter Strategy will be launched at the end of October and will be
accessible on the SLC website and promoted on social media and via
the press.
Green
Page 11
26

Page 27

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Develop Climate
Change and
Sustainability Plan to
support educational
settings
Empower the involvement of children and young people in
schools and through the Young People’s Forum to help
shape and influence Council outcomes in the climate
strategy
The Youth Forum for Climate Change and Sustainability have been
working towards the Conference of Schools 1 event, Hamilton Palace
Sports Grounds 11 - 13 October 2022. Representatives from South
Lanarkshire primary schools have been invited to attend this event with
a total of 540 primary children over the 3 days. The event will involve
the youth forum members delivering a series of 5 workshops based
around their TIERS- Travelling, Influencing, Eating, 3Rs (Reduce,
Reuse, Recycle) and Shopping.
As well as the youth forum children who are delivering the workshops,
South Lanarkshire staff, Keep Scotland Beautiful and TEDxGlasgow
will attend to help support the work within the TIERS and the activities
being delivered. Students and staff attending the will be asked to
complete a short evaluation after the event.
After the event, a form will be shared with the young people and staff
who attended the workshops asking them to make a pledge- this can
be shared further within schools. There will also be a resource shared
with all primary school head teachers providing an overview of the
speeches, presentation, activities and events that have taken place at
COS1. This resource contains teaching resources for schools to use to
encourage and further embed the teaching and learning for climate
change and sustainability within their schools.
Green
Page 12
27

Page 28

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Education and Learning
Action Measures Comments/ Progress Status
Ensure effective delivery
of tackling poverty policy
and raise awareness of
the priorities contained
in the Local Child
Poverty Action Report
(LCPAR) across all
partner organisations
Produce and publish a refreshed Local Child Poverty Action
Report and summary by June 2022 to increase awareness
among partners
A new Local Child Poverty Action Report has been completed and
published. A copy has been sent to our Scottish
Government/improvement Service contacts. An ODT version has been
produced for uploading to web pages as per accessibility guidelines.
The newly published report contains evidence of good practice and
impact across South Lanarkshire, a focus on our improvement work to
improve outcomes for families at risk of experiencing poverty and a
revised set of priorities for the next reporting cycle.  The report also
contains a section on agreed improvement areas and plans to develop
activity around them with children and families.
Complete
Health and Wellbeing
Action Measures Comments/ Progress Status
Implement Government
Strategies relating to
mental health, additional
support needs, physical,
sensory and learning
disability
Provide annual reports to Senior Management Team and
Social Work Committee on progress of implementation of
national strategies
A report is being prepared for Senior Management Team regarding
range of national strategies, for example:
The See Hear Strategic Working Group workplan and group
membership is currently under review. An engagement event, with
support providers for our community of sensory impaired individuals
and their carers, is in the early planning stages for Spring 2023.
Green
Page 13
28

Page 29

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Health and Wellbeing
Action Measures Comments/ Progress Status
Monitor vulnerable
adults referrals/activity
Produce quarterly Adult Protection report for Adult Protection
Committee and Chief Officers Group to monitor ASP activity
Quarterly reports have been produced for the Adult Protection
Committee and Chief Officers Group monitoring ASP activity.
In Quarter 2 the Resource worked with a number of service users as a
result of Adult Support and Protection (ASP) issues.  There were 852
ASP inquiries, with 384 investigations started in the period and 8
protection plans being progressed.
Green
Ensure effective
contribution to health
and social care
outcomes contained
within the Strategic
Commissioning Plan
Implementation of agreed housing actions within SCP3 to be
progressed throughout the duration of the SCP3
SCP3 now published with two strategic intentions relating to housing
and homelessness, work continues to progress operational directions
for the implementation of routine enquiry and priority access to health
services for homeless households.
Green
Support the
implementation of the
IJB Directions which
focus on the shifting the
balance of care
Provide progress reports to the IJB in relation to the
Directions in quarter 2 and 4.
A review of the strategic directions was undertaken and presented to
the IJB at its meeting on 25th January 2022 and 27 directions were
agreed with 8 directions being removed as they had been completed
with those remaining being current.
The IJB approved the Strategic Commissioning Plan 2022 - 2025 at its
meeting on 29 March 2022 and provided an update report on the
directions to South Lanarkshire Council and NHS Lanarkshire in place
from 1 April 2022.  This included a proposal for an additional direction
which was approved, namely, NHS Lanarkshire and South Lanarkshire
Council to work alongside the IJB
as Anchor Organisations to address inequalities and improve the
wellbeing of South
Lanarkshire communities.
Green
Page 14
29

Page 30

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Children and Young People
Action Measures Comments/ Progress Status
Evaluate the impact of
Early Learning and
Childcare 1140 hours for
2-3 year olds
Ensure that the uptake of 1140 hours for 2-3 year olds by
families who meet the eligibility criteria is maximised
Education Resources continues to provide the full delivery of places
for eligible children in line with Scottish Government funding allocation
and has strong links with Health and Social Work colleagues to
promote the early access to quality nursery provision.
Our website also provides parents with a range of information
regarding entitlement along with links to support access to a range of
benefits. The authority promotes opportunities for parents from
low-income households who are not eligible for 1140 hours funded
Early Learning and Childcare to apply for the SLC programme for
exemption to nursery fees.
Green
Housing and Land
Action Measures Comments/ Progress Status
Development and
implement Local
Housing Strategy for
2022-2027
Local Housing Strategy developed, consulted and approved
by Executive Committee November 2022
The Local Housing Strategy 2022-27 consultative draft has been
developed and published online, with the consultation period running
to 30th October 2022.  A calendar of consultation events with key
stakeholders is underway, including with tenants and residents, and
there is the option of an online survey for people to share their views.
The updated draft will be ready for approval by the Executive
Committee in November 2022.
Green
Page 15
30

Page 31

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Housing and Land
Action Measures Comments/ Progress Status
Improve access to
settled accommodation
for homeless
households
Rapid Rehousing Transition Plan delivered Third annual review of the RRTP was submitted to the Scottish
Government on 30 June 2022, five key priority objectives continue to
be a focus of the plan with 96% of indicators either on target or
anticipated to meet target by the conclusion of the plan.
Green
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Complete quality assurance checks to monitor and ensure
compliance with care inspectorate standards.  Each of the 34
sheltered housing complexes will be checked during 2022/23
with findings of completed checks reported on a quarterly
basis
Quality assurance checks routinly undertaken across complexes with
high compliance rates
Green
Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement
Site Investment Masterplans reviewed in consultation with
residents and planned improvement works for progression
during 2022 and current works completed by 31 March 2023
Work continues to be progressed on both South Lanarkshire sites to
improve facilities and amenities available to residents. These works
are being taken forward in conjunction with site residents, who have
jointly developed site masterplans that highlight key projects they wish
to see take place. This includes the delivery of a new community
facility at Shawlands Crescent in Larkhall. Officially opened in August
2022 the facility was co-designed by residents and aims to provide a
safe, accessible space for them to socialise as well as a place for
housing, education and health teams to host services. In addition, a
range of other projects are being taken forward to ensure the sites
continue to meet legislative compliance and standards with completion
of recent fire safety improvements anticipated by November 2022.
Green
Increase supply of
housing suitable for
older people
All properties that are suitable, as identified at the void stage,
will be converted to Amenity standard
Unassigned
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP
and reported to Housing and Technical Resources
Committee
59 properties delivered across SLC in second quarter. Hamilton
Division - 28 New build, 4 buy backs
East Kilbride Division - 21 new build, 6 buy backs
Green
Page 16
31

Page 32

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Housing and Land
Action Measures Comments/ Progress Status
Physical regeneration
work in priority areas
Work with partners to bring 15 Long Term empty homes into
use by March 2023
8 homes brought back in to use up to the end of quarter 2. Green
Project Management of
Schools Projects and
General Services
Projects
The General Services Programme spend will be achieved for
the financial year
Spend to Period 6 £20,218,213.33.  Revised 2022/23 Budget
£95,814,610.
Green
Improve energy
efficiency stock to help
address fuel poverty
Deliver investment projects to increase energy efficiency of
housing stock during 2022/23
Site start for External Wall insulation projects has been delayed due to
Ecological Survey results. Revised processes for ECO4 programme to
be approved shortly.
Amber
Our Economy
Action Measures Comments/ Progress Status
Support and nurture
growth in the Tourism
sector, taking advantage
of South Lanarkshire's
natural environment,
heritage, and culture
Launch new South Lanarkshire Tourism Strategy by October
2022, and work with partners and stakeholders to implement
the subsequent South Lanarkshire Tourism Action Plan
Finalised strategy to be presented to Community and Enterprise
Resources Committee in December 2022, and arrangements are in
place for action plan to be implemented.
Amber
Page 17
32

Page 33

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Deliver an economic
development strategy to
capitalise on our
economic strengths,
tackle weaknesses and
create a flourishing,
green, dynamic and
equitable place for all
Consult on the draft Economic Strategy (2022-27) during
Summer 2022, and present the final Strategy for Committee
approval by October 2022
The final community consultation exercise was completed on 26
September 2022. Results are being collated and the final strategy will
be presented to Community and Enterprise Resources Committee in
December 2022.
Amber
Deliver effective
Employability Services
to support Economic
Recovery
Deliver the Young Persons Guarantee Programme. A
guarantee to young people aged 16-24 to support and
progress them into fair work opportunities, training or further
education and volunteering
We continue to deliver support to young people aged 16-24 with Key
Workers supporting them on their journey towards sustainable work.
The young people engaged having multiple barriers to employment
and require longer intensive employability support
Green
Kickstart Programme – support DWP flag ship programme
as the largest employer in the area providing fair work
opportunities for 50 young people to work within the council
in various occupations
South Lanarkshire Council won an employer award for this UK govt
funded programme. Of the Kickstart trainees who started, 19 have
been successful in securing either a longer term or permanent post
within the Council before their Kickstart opportunity came to an end. 1
trainee secured a similar role with a different employer, and 4 have
exited the programme upon completion to pursue opportunities
elsewhere.   We currently have 19 trainees still on their Kickstart
journey and we expect to see the majority of them progressing into
Council jobs.
Green
Support Modern Apprentices to enter fair work opportunities
within the Council ranging from care, admin and craft
occupations
We support a range of MA's in Care, Digital/IT, Construction and
Business Administration. The programme is on target with 32 starts to
date
Green
Page 18
33

Page 34

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 13 October 2022
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Deliver targeted recruitment programmes to support the local
jobs market addressing skills shortages such as HGV
Drivers, Personal Carers, Customer Service etc
We currently have 12 trainees progressing through HGV training and
tests including wraparound employability support and will be extending
the scope to support PCV opportunities.
Green
Deliver targeted employer recruitment incentives to support
those aged 25 plus enter and sustain fair work opportunities
and support parents and families with complex barriers to
employment
The employer engagement function continues to support businesses
with recruitment incentives to support clients with multiple barriers to
employment and help parents and families most in need. A dedicated
Money Matters member of staff is now providing in work better off
financial support and advice  including helping the most vulnerable
families within our communities as the cost-of-living crisis looms, rising
interest rates and energy and food bills remain stuck at historic highs
Green
Delivering the plan and achieving best value
Action Measures Comments/ Progress Status
Adjust the Council
Workforce Plan to
match the changed
environment
Resource Workforce Plans updated taking account recovery
from COVID and set out requirements moving forward.
These will be used to configure the Council Workforce Plan
and will reported to Committees by September 2022
Workforce Plans as described have been presented to committee. Green
Take forward IT strategic
developments
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements
On course to achieve Green
Complete first phase of migration to Oracle Cloud Fusion
system by February 2023
On course to achieve Green
Ensure monitoring,
compliance and control
of externally purchased
services
Produce annual report to Senior Management Team on the
quality of care provided by externally purchased services
A report being prepared for Senior Management Team regarding
externally commissioned registered care services.
Green
Page 19
34

Page 35

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 29 November 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Resource Plans - Red and Amber Results at Quarter 2,
2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Performance and Review Scrutiny Forum with summary information on
performance measures where Resource Plan results at Quarter 2, 2022/2023 were
recorded as either red or amber 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the detail relating to red and amber results be noted; and
(2) that remedial action or mitigation be noted.   
3. Background
3.1. In May 2011, the Forum noted proposals to report summary performance information
where Quarter 2 Resource Plan results were recorded as being either red or amber.  This
approach enables a more targeted response to performance reporting than providing
reports on all Connect and Resource Plan measures.  The definition relating to red and
amber status is as follows:- 
Status Definition
Red There has been major slippage against timescale or major shortfall against
target
Amber There has been minor slippage against timescale or minor shortfall against
target 
3.2. The information included within this report and Appendix 1 is a summary of the red and
amber results from the Quarter 2 progress reports which will be reported to individual
Resource Committees.  The information in respect of red and amber measures is
presented to the Forum to enable more detailed consideration and scrutiny, as
appropriate. 
3.3. In addition to working towards the six Connect Outcomes, the Council will continually aim
to improve and ensure effective and efficient use of resources, and that business will be
conducted with integrity and transparency and will operate to the highest standards.  In
order to monitor and report progress against these values, Resource outcomes have also
been identified, under the theme Delivering the Plan and achieving Best Value. 
4
35

Page 36

3.4. As the Forum is aware, from March 2020 onwards at times the Council was forced to
suspend or reduce a number of services that could not be continued in full due to the
Covid pandemic. The Council was also obliged to redirect resources so that it could
deliver vital new services and supports for individuals, communities and businesses.
Despite the return of services through the Council’s Recovery Plan, there is a Covid
legacy in terms of a residual impact on some services and a significant build-up of
demand, as a result of which there remains an inevitable impact on performance in some
areas. 
4. Quarter 2 2022/2023 Red and Amber Results
4.1. In 2022/2023 there are 234 measures across all Resources under the six Connect
Outcomes, and the theme Delivering the Plan and achieving Best Value.  The majority of
these (216 or 92%) were reported as blue/green/report later at Quarter 2, with the
remaining 18 measures reported as red or amber. 
4.2. Appendix 1 includes details of red and amber performance results across all Resources. 
Table 1 below provides a summary of the results by Resource over the last three years. 
Table 1 – Red and amber performance results by Resource
Resource Red Amber Total
20/21 21/22 22/23 20/21 21/22 22/23 20/21 21/22 22/23
Community
and
Enterprise
- - 1 9 3 7 9 3 8
Education - - - 4 2 2 4 2 2
Finance
and
Corporate
- - 1 2 3 2 2 3 3
Housing
and
Technical
1 - 2 3 2 1 4 2 3
Social
Work
2 - - - 2 2 2 2 2
Total 3 0 4 18 12 14 21 12 18 
4.3. There has been an increase in the number of red/amber status measures reported in
comparison to the previous year. This is due in part to a continuing, comprehensive
review of measures and targets which has resulted in greater clarity in the measures,
which facilitates assigning the most appropriate status. 
4.4. Table 2 below shows the results by Outcome/theme. 
Table 2 – Analysis per Outcome/theme: 2022/2023 (as at 7 October 2022)
Connect Outcome/theme Red Amber Total
Communities and environment 1 6 7
Education and learning - 1 1
Health and wellbeing - - -
Children and young people - - -
Housing and land - 1 1
Our economy - 3 3
Delivering the plan and achieving Best Value 3 3 6
Total 4 14 18 
36

Page 37

4.5. A detailed explanation on progress to date is included in Appendix 1 grouped per
Outcome.  These explanations provide details surrounding the circumstances which have
given rise to the red or amber status, including unforeseen changes in timescales or
circumstances, or work being underway but not yet complete.  Progress updates provide
revised timescales for completion and management action, where relevant. 
5. Next Steps
5.1. The Forum is asked to note the detail included within Appendix 1. 
6. Employee Implications
6.1. The Outcomes noted in the Council Plan will inform the Resource Plans and in turn the
Performance Appraisal process for individual employees. 
7. Financial Implications
7.1. Provision for meeting the Council Plan’s Outcomes is reflected in both the Revenue and
Capital budgets, and longer term, within the framework of the Council’s approved
Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. Any Climate Change, Sustainability and Environmental implications relating to this report
have been considered as part of the Resource Planning process. 
9. Other Implications
9.1. In respect of risk, the detail of this report will provide the Forum with targeted
performance information on a timely basis to allow it to adequately perform its scrutiny
role. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Equality Impact Assessments will be undertaken in line with the various actions in
Connect, as appropriate.  This report does not introduce a new policy, function or
strategy, or recommend a change to an existing policy, function or strategy and,
therefore, no impact assessment is required. 
10.2. Many of the Outcomes and actions detailed within Connect and the Resource Plans
reflect ongoing work programmes implemented to address local and national priorities. 
Extensive consultation, therefore, has already taken place in relation to a significant
proportion of the outcomes and actions outlined in the Plan. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
14 November 2022 
Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving 
Previous References 
 Report to Performance and Review Scrutiny Forum 31 May 2011: Performance and
Review Scrutiny Forum - Performance Reporting Arrangements 
List of Background Papers
 None
37

Page 38

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:-
Tom Little, Head of Communications and Strategy  
Ext:  4904  (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk
38

Page 39

Appendix 1
Resource Plans Quarter 2 Red and Amber Results 2022/2023 
Connect Outcome - Communities and environment  
2022-23 Last 3 years
Statistical Measure Comments/Progress Status Target  To date 2019-20 2020-21 2021-22
Percentage of streets found to be
acceptable during LEAMS survey
Community and Enterprise
Resources (CER)
The LEAMS survey has now been replaced by the Litter
Monitoring System (LMS). This is a statutory requirement
and involves external validation by Keep Scotland
Beautiful. The external validation for reporting period 1
was 87.6%. We are currently carrying out the second
inspection which will be reported later. The final LEAMS
score for 2021-22 will be reported as part of the Local
Government Benchmarking Framework (LGBF) in early
2023.
Amber 94.1% 87.6% 94.8% 94.1% ----
Land Audit Management System
(LAMS) grounds maintenance
score CER
LAMS measures the quality of grounds maintenance
based on surveys which are completed throughout the
year. Taking the scores to date (68, 73, 72 and 71), our
current overall score is 71. This is slightly below target,
however, we still have one additional inspection to carry
out
Amber 72 71 72 72 71.3
Percentage of total household
waste that is recycled in 2022
CER
Measure is reported per calendar year. The figure for
quarter two (April to June 2022) was 45.07%. This
equates to 40.28% for the year to date (2022). This is
below the 2021 figure (44.5%), and remains below the
target figure of 50%. Higher residual waste tonnages
collected at the kerbside due to Covid-19 and home-
working, high residual waste content in bulk uplifts (black
bag waste accepted), and more non-recyclable waste
being disposed of in Household Waste Recycling
Centres, are all factors that need to be taken into account
when understanding the household waste recycling
performance.
A new contract is now in place for bulky waste (from 1
April 2022), and this has increased the amount of bulky
waste being recycled. Previous contract only managed
approximately 15%. The first 3 months of the new
contract have seen 50% of this waste recycled. 
Red 50.00% 40.28% 46.40% 40.50% 41.50%  
4
39

Page 40

Percentage of offenders on CPO
unpaid work requirement seen
within five working days by their
case Social Work Resources
(SWR)
In quarter 2, 70% (83 out of 119) of offenders had their
induction within 5 working days. To date 72% (197 out of
272) of offenders had their induction within timescale.
Amber 75.0% 72.0% 77.0% 57.0% 68.0%
Percentage of people starting
their placement within seven
days of a CPO unpaid work SWR
In quarter 2, 68% (81 out of 119) people started their
placement within 7 days. To date 70% (191 out of 272) of
people commenced their placement within timescale.
Amber 75.0% 70.0% 77.0% 47.0% 65.0% 
2022-23
Project Measure Comments/Progress Status
Report on draft Open Space
Strategy to Planning Committee
in March 2023 CER
There has been a further delay with Scottish Government's
programme for issuing the Open Space Strategy (OSS)
Regulations and Guidance. It will not be possible to make
progress on the Council’s OSS until these are available. It
is unlikely that a report to March 2023 committee is
feasible in these circumstances
Amber
Develop a new Biodiversity
Implementation Plan for (2023-
27) for approval by Climate
Change and Sustainability
Committee by March 2023 CER
Currently progressing the recruitment of a new Biodiversity
Officer, and this will be a priority for this financial year 
Amber 
Connect Outcome - Education and learning  
2022-23 Last 3 years
Statistical Measure Comments/Progress Status Target  To date 2019-20 2020-21 2021-22
Provide up to 400 Foundation
Apprenticeship (FA) opportunities
at Level 6 to young people in the
senior phase Education
Resources (EDR)
There were over 400 opportunities offered, however, only
273 pupils took up an FA offer this year. A key factor to
the lower number of FA starts this year is as a result of
legacy impact of Covid 19. The FA team were unable to
attend School Career option choice sessions to engage
with pupils and parents to promote and market the
programme effectively. Furthermore, additional critical
events such as Depute Head Teacher (DHT)
development day and targeted school management team
visits were not possible due to the Covid 19 restrictions
during 2020-21. In addition, the Glasgow Consortium
delivering foundation apprenticeships withdrew the offer
of some frameworks which reduced the overall number of
opportunities for South Lanarkshire
Amber 400.0 322.0 ------ ------ ------ 
40

Page 41

Connect Outcome - Health and wellbeing
- No red/amber measures at Quarter 2 
Connect Outcome - Children and young people
- No red/amber measures at Quarter 2 
Connect Outcome - Housing and land  
2022-23
Project Measure Comments/Progress Status
During 2022-23, reduce the
overall homelessness caseload
from 900 to 850 and reduce long
term homelessness caseload by
10% Housing and Technical
Resources (HTR)
Overall positive achievement of reaching a level of 765
cases in March 2022 - there is concern that levels are
rising sharply in the first quarter of 2022-23 and there is a
danger of not meeting this target by March 2023. 
Amber 
Connect Outcome - Our economy  
2022-23 Last 3 years
Statistical Measure Comments/Progress Status Target  To date 2019-20 2020-21 2021-22
Number of unemployed people
accessing further education or
training Finance and Corporate
Resources (FCR)
Numbers are lower than expected, however, overall target
will be met with expected increased levels reported in the
next quarter update. This is for Q1 performance April to
June. Employability reports quarterly in arrears.
Amber 200
people
13
people
568
people
211
people
219
people 
2022-23
Project Measure Comments/Progress Status
Consult on the draft Economic
Strategy (2022-27) during
Summer 2022, and present the
final Strategy for Committee
approval by October 2022 CER
The final community consultation exercise was completed
on 26 September 2022. Results are being collated and the
final strategy will be presented to Community and
Enterprise Resources Committee in December 2022. 
Amber
Launch new South Lanarkshire
Tourism Strategy by October
2022, and work with partners
and stakeholders to implement
the subsequent South
Lanarkshire Tourism Action Plan
CER
Finalised strategy to be presented to Community and
Enterprise Resources Committee in December 2022, and
arrangements are in place for action plan to be
implemented 
Amber  
41

Page 42

Delivering the plan and achieving Best Value 
2022-23 Last 3 years
Statistical Measure Comments/Progress Status Target  To date 2019-20 2020-21 2021-22
Customer Service Centre –
average queue time FCR
Slight slippage in target. Currently sitting at 153 seconds.
Target is 120. The service continues with recruitment to
increase performance from the current level, to ensure
target is met. 
Amber 120 153 94 93 158
Average time in working days for
a full response at Stage 1 HTR
Although performance is below annual target at end of
quarter 2, work continues to ensure overall target
achieved.
Red 5 9 4 5 5 
2022-23
Project Measure Comments/Progress Status
Evaluate existing professional
networks and use the outcomes
to expand leadership capacity
across the Resource EDR
West Partnership (WP) have offered opportunities for
Head Teachers (HT) to facilitate on the Thinking about
Headship programme - two Head Teachers have secured
a place on the WP Executive Coaching programme. South
Lanarkshire Council leadership programmes for aspiring
Principal Teachers and Depute HTs both start in
September.
Amber
Migrate to new Integrated
Housing and Property
Management system by
November FCR
Due to COVID and other technical reasons, the project has
experienced delays and is to be rescheduled for
implementation in October 2023.
Red
Continue with phased
implementation of new IT
system HTR
Discussions ongoing with supplier on the revised delivery
timeline of October 2023 and gaps in current business
functionality requirements.
Red
Develop a new 5 year strategy
for South Lanarkshire Leisure
and Culture (SLLC) in August
2022 CER
The strategy has been submitted to the Council for noting
at a future Committee meeting and will be launched by
SLLC in Autumn 22
Amber 
42

Page 43

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 29 November 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Audit Scotland Report: Local Government in Scotland
Overview 2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Forum with a summary of the Audit Scotland Report ‘Local
Government in Scotland: Overview 2022’ published in June 2022
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendation(s):-
[]
(1) that the key messages and recommendations within the report be noted.
[1recs]
3. Background
3.1. In June 2022, Audit Scotland published the above report on behalf of the Accounts
Commission.  This ‘overview’ report is prepared each year and covers key areas of
current and future activity relative to local government and an opinion on how these
are or should be managed. 
3.2. The latest Local Government Overview (LGO) is the second in a series of reports
reflecting on the evolving and long-term nature of the impact of Covid-19.  The 2021
report considered the initial response phase of the pandemic from March 2020 to
February 2021, while the present report (2022) looks at the second year of the
pandemic from March 2021 to February 2022. 
3.3. The latest report builds on last year’s LGO and assesses:- 
 the ongoing impact of Covid-19 and councils’ progress towards recovery and
renewal
 how councils are positioned to address long-term priorities including climate
change, inequality and public service reform
 how effectively council leadership is managing recovery and renewal. 
3.4. This report provides a summary of the Local Government in Scotland Overview
document along with a council position in relation to the recommendations within the
LGO. 
3.5. To accompany the LGO, the Accounts Commission has prepared a checklist of
questions for Elected Members to consider, attached at appendix 1 to this report. 
The questions cover much the same ground as the recommendations within the
Overview. 
5
43

Page 44

4. Key Messages
4.1. The report contains six key messages:- 
 Councils have had a very difficult year.  Alongside the ongoing response to
the pandemic, councils have faced challenges in recovering services, dealing
with increased demand and backlogs, and meeting community needs and
expectations. This has taken place against a backdrop of long-standing
pressures such as increased demand from an ageing population and rising
poverty.
 The challenging context means collaborative leadership is more important
than ever. Councils are operating in a difficult and uncertain strategic context
and face longer-term financial pressures, a lack of certainty and flexibility over
long-term funding, and the prospect of major service reforms. This challenging
context needs local government leaders skilled in effective strategic thinking,
decision-making and collaborative working, and able to learn lessons from new
ways of working. Collaborative leadership is more important than ever as councils
work with partners, communities, and citizens to support recovery and improve
outcomes.
 Pressure on the local government workforce continues. Councils are
continuing to experience high absence levels. Impacts on staff wellbeing and
skills shortages, particularly in front-line workers, have also been noted. A
resilient workforce is critical to the ongoing response to Covid-19 and the
recovery of services. Workforce plans will need to be updated, considering
lessons learned from new ways of working. Wellbeing support for the workforce
must also continue.
 The impact of the pandemic and service disruption have been felt most
strongly by those already experiencing inequality. Councils have worked
hard and adapted to maintain service delivery but not all services are back at pre-
pandemic levels so those most in need of support are still being affected.
Councils must evaluate these impacts so that recovery and renewal supports
those most affected and addresses inequalities. Recovery and renewal should
also reflect the wider ambitions of the public service reform agenda.
 The early response showed what could be achieved by working closely
with communities and the voluntary sector. This momentum may be lost if
communities and the voluntary sector are not involved in shaping recovery.
Flexible governance and decision-making structures will be needed, as will
opportunities for more local participation.
 Improvements are needed in data availability, tools and skills to support
performance monitoring, strategic decision-making and planning service
improvements. Data has been important in guiding the response to the
pandemic but there are key areas where a lack of data could hamper recovery,
such as unmet needs, service demands and backlogs. Data is a key tool in
tackling inequality but there are gaps in equality data, particularly at a local level. 
5. Key Themes and Messages
5.1. The report is structured around three main themes on which progress towards
recovery and renewal depends:- 
 Responding to the external environment
 Organising the council
 Meeting local needs  
44

Page 45

5.2. Responding to the external environment:- 
 Councils have to respond to a large and complex programme of reform, including
social care reform, and the impacts of departure from the EU.
 The impact of the pandemic sits against a backdrop of long-standing and growing
demographic pressures and a growing cost of living crisis that will affect demand
for council services.
 Climate change is recognised by councils as an urgent issue. They have
committed to taking action to achieve net zero, but clearer plans are needed to
achieve it.
 Challenges for councils include uncertainty over funding and continuing demands
arising from Covid.
 This uncertain and challenging context needs effective strategic thinking,
decision-making and collaborative working from local government leaders. It also
needs a resilient workforce, and a culture that promotes collaboration, innovation
and wellbeing. 
5.3. Organising the council – leading recovery and renewal:- 
 Leaders in local government face a challenging context. As they plan for recovery
and renewal it will be important that they collaborate with their partners and
communities. This will need skilled leadership, learning lessons from the
pandemic and working to make the best use of resources to improve outcomes.
 Councils prepared recovery plans in response to the pandemic, and leaders are
now starting to plan and set out their vision and strategy as their councils
navigate the uncertainties and challenges they face.
 There are good examples of councils showing leadership in tackling long-
standing structural issues through new place-based initiatives such as community
wealth building.
 Collaborative leadership skills have been important during the response phase
and need to be maintained to meet the complex challenges ahead.
 Changes and turnover in senior officer and political leadership present a risk to
councils’ capacity to maintain momentum and drive forward recovery.
 As governance structures are re-established, better information is needed on
service recovery to support scrutiny and inform decision-making.
 Councils recognise that they have an opportunity to learn lessons from the new
ways of working and approaches to service delivery that have been put in place
in response to the pandemic.
 Data has been important in guiding the response to the pandemic. But
improvements are needed in data availability, tools and skills to support
performance monitoring, strategic decision-making and planning service
improvements. 
5.4. Organising the council – managing resources:- 
 Councils’ finances have been significantly affected by Covid-19. The long-term
funding position remains uncertain, with significant challenges ahead as councils
continue to manage and respond to the impact of the pandemic on their services,
finances, and communities.
 Covid-19 significantly impacted on many aspects of councils’ finances in
2020/2021
 Funding to local government has been reduced in real terms since 2013/2014.
The rest of the Scottish Government budget has seen an increase in funding over
the same period. 
45

Page 46

 The ongoing absence of a multi-year financial settlement creates uncertainty for
councils at a time when effective and robust financial management is crucial.
 Councils now need to review longer-term financial plans as Covid-19 uncertainty
diminishes. They should ensure that financial plans are clearly linked to
overarching recovery strategies.
 As Covid-19 funding ends, councils will need to adapt and make difficult
decisions to maintain financial sustainability.
 While COSLA and the Scottish Government continue to discuss the extent of
ring-fencing in the local government budget, it is clear that spending on priority
areas has increased while other areas of the local government budget have faced
spending cuts.
 Covid-19 has impacted on capital projects and volatility in capital funding
allocations could affect councils’ recovery and investment plans. 
5.5. Organising the council – managing the workforce:- 
 Pressure on the local government workforce continues, with high absence levels,
impacts on wellbeing, particularly for front-line workers, and skills shortages in
key areas. A resilient workforce is critical to the ongoing response to Covid-19
and the recovery of services. Councils will need to update workforce plans, learn
lessons from new ways of working put in place, and provide wellbeing support for
their staff.
 The second year of the pandemic continues to have a negative impact on the
workforce and staff wellbeing.
 Councils are facing skills shortages and recruitment difficulties in key areas, and
the pandemic has made workforce planning both more difficult and more
necessary.
 However, Councils have adopted new ways of working with good results. 
5.6. The report’s recommendations in respect of “organising the council” are shown
below, with an assessment of the council’s position and any action considered
necessary. 
Recommendation South Lanarkshire Council position and
action proposed if required
Councils together with their partners
and communities should revise their
strategic plans, including Local
Outcomes Improvement Plans to
realign priorities and provide a
roadmap for recovery and renewal.
They should also consider how this
contributes to the national recovery
strategy set out by the Scottish
Government.
In 2021/2022 the Council and the
Community Planning Partnership (CPP)
reviewed their strategic plans, with the
council developing a new 5-year strategic
Plan, Connect 2022-27, while the CPP
refreshed the Community Plan (Local
Outcomes Improvement Plan).  Both
plans are built around a shared vision to
improve the lives and prospects of
everyone in South Lanarkshire.  Both
plans align actions to a common set of
key themes and outcomes, with People,
Progress and Planet forming the core
priorities for both Plans.  This places
recovery and renewal at the heart of what
we do, by putting people first and working
together towards a sustainable future in
sustainable places.  
46

Page 47

Elected members and senior
managers need to work together to
drive change, make decisions and
deliver recovery and renewal.
As well as regular dialogue taking place
between the Chief Executive and political
group leaders, and Executive Directors
and their Resource Committee chairs,
members awareness sessions and
briefing notes are issued so that decision
making on plans, strategies and policies
and other decisions to deliver recovery
and renewal are informed by advice and
assistance from senior managers.
Councils should consider the
leadership skills needed for now and in
future. This includes clear succession
planning arrangements and a
structured programme of induction for
new elected members.
Refreshed workforce plans, including
leadership and succession planning are
complete. Plans are going through the
committee cycle post recess.
Induction programme for elected
members in place.
Councils’ governance arrangements
should ensure that their elected
members have sufficient information to
support the scrutiny and decision-
making needed for recovery and
renewal
Regular meetings are held with the
Administration political group leaders,
members awareness sessions are
arranged and briefings are issued to all
members as appropriate. Committee
reports are sufficiently detailed to inform
members and include employee,
financial, and risk implications. Public
Sector Equality Duty (PSED) and Fairer
Scotland Duty impact assessments are
carried out, as appropriate, and are
available for members information.
Executive Committee reports are made
available to all members and members
are encouraged to submit questions in
advance of committees if they require
further information on any item on the
agenda to aid scrutiny and inform
decision making.
Councils need to clearly set out how
they are evaluating new service
models and learning lessons from the
response to Covid-19
The Council has a programme of
transformational reviews, including
learning from required service changes
through Covid.
Councils should have a clear plan for
developing the use of data in their
councils, this includes data skills, data
standards and data tools.
The Council’s Digital Strategy, approved
in June 2022, describes how improved
use of data across the Council will
facilitate service improvement,
efficiencies and digital inclusion. A critical
aspect of this strategy is the requirement
to upgrade council systems and deliver a
data infrastructure which will enhance
data quality, availability and security.
This, in turn, will enable standard tools
such as self-service, management
reporting and analytics to be rolled out.
The strategy also notes that, to
successfully digitally transform, a
programme of upskilling of staff will be
required.
47

Page 48

Councils must ensure that financial
plans and overarching recovery
strategies and actions are clearly
aligned, including funding to deliver on
their duty to address inequalities.
The Council received a report in June on
the budget position with a fuller strategy
to follow.  The position in relation to
spend on Covid was reported to
Committees throughout 2021/2022.  
Councils must have clear plans for
management of reserves
The Council’s accounts provide details of
the reserves held by the Council and the
reasons for these.  Financial strategies
also provide an update on the strategy
for reserves.
Councils should update their workforce
plans to build on lessons learned,
address skills gaps and build a
resilient workforce for the future. This
will include monitoring the wellbeing of
the workforce, and the effectiveness of
health and wellbeing initiatives.
Refreshed workforce plans, including
lessons learnt are complete. Plans are
going through the committee cycle post
recess. 
Wellbeing is monitored and refreshed
initiatives in place following evaluation. 
5.7. Meeting local needs - impact of Covid-19 on services and inequality:- 
 The Covid-19 pandemic continues to affect council service delivery, but a lack of
clarity on demand, unmet need, and service backlogs makes the full extent of the
effect unclear.
 Councils have worked hard and adapted to maintain delivery of key services.
Digital delivery has expanded but brings with it the risk – for some – of increased
digital exclusion.
 The extent to which councils have assessed and can evidence the impact that
Covid-19 related service changes and disruption have had on different groups
and citizens in their local areas is unclear.
 The impact of the pandemic and service disruption has been felt most strongly by
those communities and citizens already experiencing inequalities.
 While councils recognise the disproportionate impact the pandemic has had on
different groups, they need to learn lessons from taking early action and assess
the impact of service disruption to address longer-term impacts.
 Some councils are using lessons learned from the pandemic to improve how they
tackle vulnerability and inequality. 
 Data is a key tool in tackling inequality but there are gaps in equality data,
particularly at a local level. 
5.8. Meeting local needs - collaboration and communities:- 
 Collaboration has enabled new relationships and more effective ways of working
but communities and local partners need to be more involved in recovery.
 There is limited evidence of direct community input driving recovery actions and
more needs to be done.
 Voluntary sector organisations are facing pressures that could threaten their
ability to deliver services to vulnerable people who rely on them.
 Councils worked well with their community planning partners in the response
phase, but they need clearer plans for the future. 
5.9. The report’s recommendations in respect of “meeting local needs” are shown
below, with an assessment of the council’s position and any action considered
necessary.  
48

Page 49

Recommendation South Lanarkshire Council’s position and
action proposed if required
While some progress has been made
in improving the use of data in
decision-making, councils need to
have a clear sense of where increased
demand and service backlogs exist so
that they can identify areas of high risk
and direct resources accordingly. This
information also needs to be more
transparent and publicly available.
The Council produces a range of data
about South Lanarkshire and the
communities within it.  Data can be
obtained at a local level and analysis of
socio-economic statistics including
deprivation (SIMD) are publicly available
to view via maps, tables and charts on
the council’s website. 
Council services utilise a wide range of
service metrics and performance
information to monitor demand and
performance levels.  Many of these are
publicly available through performance
reports on the Resource Plans and
through the Public Performance
Reporting pages on the Council’s
website.
A key priority for councils’ recovery and
renewal is assessing the impact of the
pandemic and service disruption on
the most vulnerable and learning from
this to inform how they support those
most affected and address
inequalities. This will need better local
data to improve understanding.
The Council is keeping abreast of current
research to ensure its response is timely
and effective.  The changing labour
market/employability needs and possible
methods of addressing these are
examples of using local data to improve
understanding and supports.
Where councils plan to continue with
the changes made to services during
the pandemic, they need to conduct
impact assessments and consult the
community. With the expansion of
digital services, councils need to
assess and mitigate the impacts of
digital exclusion.
Since prior to the pandemic, the Council
has established a Digital Inclusion Sub-
Group chaired by the Head of IT. The
group has representatives from all
Council Resources, South Lanarkshire
Leisure and Culture and 3rd sector
organisations providing services to
citizens in South Lanarkshire. The sub-
group’s remit is to identify and mitigate
causes of digital exclusion, including lack
of access to the internet, lack of skills or
financial factors. Funding has been
allocated for devices for vulnerable
citizens and to provide public wi-fi in
neighbourhood planning areas. The sub-
group also provides input to the Council’s
digital strategy to ensure that, as new
technologies are introduced,
consideration is given to ensure that
people are not digitally excluded. 
Equality Impact Assessments underpin
key decisions and consultation takes
place regularly.  Digital exclusion is being
addressed in a number of ways, with
devices distributed through programmes
in Education and Employability
49

Page 50

Councils need to ensure that
partnership working forged in the
pandemic with their communities,
partners and the voluntary sector
remains in place. They also need to
learn what made it work and harness
this to transform future engagement.
The momentum and energy from
communities may be lost if public
bodies don’t capitalise on what has
been achieved.
The Council has worked to maintain the
networks which were developed
throughout covid, supporting
communities to work together and
helping them access resources to do so
where needed.  The development of
Community Partnerships is helping to
accelerate this work, and our Third
Sector Interface (TSI) is developing
locality groupings of third sector
organisations. A new Volunteering
Strategy is in development and due for
completion soon, which will help to
support communities and the voluntary
sector to continue to work in partnership
with the public sector by identifying and
removing barriers and offering assistance
where needed. 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There is no requirement for consultation on the content of the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 November 2022 
Link(s) to Council Values/Priorities/Outcomes
• Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
• Audit Scotland Report ‘Local Government in Scotland: Overview 2021’  
50

Page 51

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
51

Page 52

52

Page 53

Local Government in Scotland Overview 2022
Questions for Elected Members 
Questions for elected members
to consider
Sample answer
Leadership – planning, strategy and improvement
Does my council have clear
plans for recovery and renewal,
that outline:
• what it needs to do in the
short, medium, and longer term
• the outcomes it will achieve 
• and the investment needed?
• Each Resource has a Response and Recovery plan
that outlines short, medium and long-term plans and
linked to Resource and Service plans.
• Each plan takes full account of the continuing or
emerging issues which are faced by customers,
employees and our services stemming from COVID-
19.  
• We continue to look at what else is happening in
Scotland, the UK and further afield, to be guided by
good practice, legislation and policy relevant to our
activities as well as internal and external pressures
that affect the Council with the aim of continuing to
provide the best services and value for money.  Our
approach is informed by, and dependent on,
guidance issued by the Scottish Government and
therefore subject to continual review and change.
Is my council together with our
partners, reviewing and aligning
strategic plans and priorities
(including Local Outcome
Improvement Plans) to deliver
recovery and renewal? Has it
consulted with communities on
these priorities?
• The council has approved a new Council Plan for the
period 2022-27 which was developed in tandem with
the Community Planning Partnership’s (CPP) work on
their refreshed Community Plan (LOIP) for the period
2022-32.
• Both plans were developed through extensive
engagement, dialogue and consultation with
communities across South Lanarkshire, involving
over 3,500 local residents commenting on their
priorities, and aligned to existing community led
plans. 
• Both plans share a common vision to improve the
lives and prospects of everyone in South Lanarkshire.
• The focus for both Plans is on 3 key areas: People,
Progress and Planet.  These put sustainable, people-
centred recovery and renewal at the core of the
strategic plans for both the Council and the CPP
• Partners are aligning their strategic plans to the vision
and key themes.
Do recovery plans for my
council consider key themes,
including: 
• New ways of working 
• Inequalities 
• Education recovery 
• Economic recovery 
• Climate emergency 
• Health and wellbeing –
community and workforce
• Resources continue to deliver a wide range of
services with a key focus on continued Pandemic
recovery as well as tackling poverty, deprivation,
inequality and measures to help mitigate the effects
of rising costs are reflected in Resource and Service
plans which link to the Council’s Connect Plan.
5
53

Page 54

Has my council considered the
Scottish Government National
Recovery Plan and Programme
for Government as part of the
refresh of its strategic plans and
recovery plans?
• The Council’s new Council Plan and its refreshed
economic strategy take into account the Programme
for Government and the National Recovery Plan
within the strategic policy context.
• Following publication of the Programme for
Government in September each year, reports are
presented to Executive Committee in November,
detailing how the Programme for Government will be
taken into account through the work of the Council,
including within the annual Resource Plans and
relevant strategies.
Does my council have clear
plans for restarting paused,
closed, or reduced services and
dealing with any service
backlogs caused by the
pandemic?
• Yes, all Resources have the Response and Recovery
plans with status update reports that highlight
paused, closed or reduced services and actions
being taken to address backlogs.
Do I know how my council is
learning lessons from the
pandemic response and
evaluating new service models
to inform improvement and drive
recovery and renewal? Am I
assured my council is building
on innovations made during the
pandemic: 
• Supporting vulnerable groups 
• Working in partnership 
• Faster decision-making 
• Delivering services differently
– eg digital 
• Working differently – remote
and hybrid
• The Response and recovery plans include continued
implementation of revised service and working
arrangements which have been put in place to deliver
services, that have been identified as being both
efficient and effective and suitable for permanent
implementation.
• These are linked to both Resource and service
planning.
Do I know how well my council
uses data and what plans it has
to develop data skills, data
standards, and data tools?
• The Council’s Digital Strategy, approved in June
2022, describes how improved use of data across the
council will facilitate service improvement, efficiencies
and digital inclusion. A critical aspect of this strategy
is the requirement to upgrade council systems and
deliver a data infrastructure which will enhance data
quality, availability and security. This, in turn, will
enable standard tools such as self-service,
management reporting and analytics to be rolled out.
The strategy also notes that, to successfully digitally
transform, a programme of upskilling of staff will be
required. 
Leadership – skills
Is my council clear on what
leadership skills are needed to
drive forward recovery and
renewal, and are there
arrangements in place to deliver
these?
• Refreshed workforce plans, including leadership and
succession planning are complete. Plans are going
through the committee cycle post recess.
• Induction programme for elected members in place.
54

Page 55

Am I aware what succession
planning arrangements and
leadership development
arrangements are in place for
the council management team?
Am I satisfied these are
appropriate?
As above
Do I have access to training and
learning materials that meet my
needs as an elected member?
Have I taken up available
opportunities that will assist me
in being effective in my role?
• Elected Members can access a wide range of training
and learning materials, including Learn Online
courses, Elected Members’ briefings, and practical
guides to safety, computing and IT topics.  Between
March 2020 and summer 2022, 78
training/awareness sessions were held with 1,157
attendances and a programme of training events is in
place until March 2023 covering topics such as
Climate Literacy, social media, and awareness
training on use of new technology in the Council
Chamber.
Governance
Do I have access to clear,
timely, and sufficiently detailed
information that allows me to
carry out my governance and
scrutiny role?
Yes as follows:
• Committee Chairs have regular 1 to 1s with Resource
Executive Directors
• Chairs and Deputes receive advance copies of
agendas and reports and attend agenda meetings
with Resource Executive Directors and senior officers
at least 7 days before agendas are issued for
committee meetings, at which they have the
opportunity to ask questions.
• All agendas and reports issued 5 working days in
advance of Committee meetings to allow members
time to digest information and ask questions to inform
decision making at meetings
• Executive Committee agendas and reports issued to
all Council elected members, who then may submit
questions on any report on the agenda for response
• Standing Order 19 gives members an opportunity to
ask a chairperson about any relevant business not on
the committee agenda. The question must be
submitted to the Chief Executive 10 clear days before
the meetings. 
• Committee members may ask the chairperson a
question about any matter on the agenda without
giving prior notice. 
• All committee meetings etc livestreamed 
• Regular Members Briefings on topics of interest
issued 
• Programme of Members Awareness Sessions held
on high profile issues to allow members to be briefed
and ask questions in advance of committees at which
they will be asked to make decisions e.g Budget,
National Care Service
• Councillor Case Management System introduced for
use by elected members to send questions to
Officers, response times etc monitored 
55

Page 56

Do I have a clear picture of
where my council is in terms of
recovery and renewal: 
• what new service demand,
unmet needs, and what
backlogs exist? 
• what changes to services have
taken place and what impact
assessments have been carried
out for changes that have
continued or are proposed?
• We continually review services to ensure they meet
the needs of service users which includes recovery
and renewal, looking at emerging service demand as
well as areas for improvement or further service
changes with the aim of continuously improving how
we do things.
• Resources continue to undertake Equality Impact and
Fairer Scotland Duty assessments against new or
revised policies and strategies as a means of
mitigating inequalities. 
• Over the course of the last 2 and half years, it has
been widely recognised that the Covid-19 pandemic
has had a disproportionate impact upon vulnerable
and disadvantaged individuals and groups within
communities.  While the majority of restrictions have
eased, the impact on these customer groups
continues to be a particular focus going forward given
the emerging cost of living crisis.
• We have a monitoring and performance framework
which is continually scrutinised at all levels which
links to Resource and Service plans and is aligned to
the council plan – Connect.   
Am I satisfied that the
governance arrangements in
place in my council offer
sufficient transparency and
opportunities for public
participation?
Yes as demonstrated by:
• All Committee agendas, reports and minutes
published on the Committee Information Page,
Council website
• All Committee meetings etc recorded and
livestreamed
• Public consultations held on relevant areas e.g
Budget, Council and Community Plan, South
Lanarkshire Local Development Plan, Neighbourhood
Plans, Planning and Licensing Policies, Health and
Social Care Strategic Commissioning Plan among
others
• Community Councils are statutory consultees for
Planning and Licensing applications
• Planning and licensing applications published on
planning portal and council website
• Neighbour notification for Planning and Licensing
applications giving opportunities to object .
• Opt in list to receive marches and parades
notifications
• Participatory Budgeting 
• School consultations regarding catchment areas or
school siting
• Annual accounts and governance statement
published on the Council website.
Do I understand what my
responsibilities are when serving
on external bodies (eg, ALEOs)
and joint boards or committees?
• Induction training provided for all members 
• Role specific training provided to ALEO members
(South Lanarkshire Leisure and Culture, Integrated
Joint Boards, Lanarkshire Valuation Joint Board and
Seemis
56

Page 57

• Role specific training provided on roles and duties of
charitable trustees
Am I familiar with the
Councillors Code of Conduct for
elected members?
• Councillors Code of Conduct, associated guidance
and Standard Commission Advice Notes issued to all
elected members.
• Number of training sessions held on the Code of
Conduct to which all members invited.
• Standard Commission newsletters issued to all
elected members 
• Members encouraged to contact Chief Executive or
Monitoring Officer for advice on
interpretation/application of the Code to particular
circumstances  
• All of above also applies to Model Code of Conduct
and Members of Integration Joint Board. 
Finance
Am I clear about the financial
challenges facing the council
and how they are being
managed?
• Officers provide 4-weekly monitoring reports to the
Council’s Executive Committee detailing the current
year position and highlighting any financial issues
arising and how they can be managed.  This keeps
members informed of the current financial position. 
• The Council received a budget strategy report for
2023/2024 in June 2022, with further updates in
September and November 2022.  These further
updates also included information on the Budget Gap
for future years, which allowed members to see the
scale of the financial challenges moving forward.   
• The November paper also included information on
accounting for Service Concessions, and the use of
the benefit arising.  This advised members of how
they could manage/reduce the Budget Gap in the
coming years. 
Has my council developed
longer term financial plans that
clearly link to recovery plans?
• The Council’s 2022/2023 budget includes the residual
impact of the pandemic, with funding carried forward
to manage the costs.  Any permanent repercussions
are built into the longer term financial strategy
including the higher than average inflation hikes in
utilities and pay. 
• The Council has a programme of transformational
reviews, including learning from required service
changes through Covid.  The financial benefit from
these reviews is assisting in the longer term financial
strategy.
Does my council have clear and
robust plans in place for the
management of reserves?
• The Council’s accounts provides details of the
reserves held by the Council and the reasons for
holding these sums.  
• Financial strategies also provide an update on the
strategy for reserves.  
57

Page 58

Workforce
Does my council have detailed
corporate and service workforce
planning in place? Have these
plans been updated to reflect
the impact of Covid-19? Do
these include plans for
managing impact of pandemic
on staff wellbeing
• Refreshed workforce plans, including leadership and
succession planning are complete. Plans are going
through the committee cycle post recess.
• Induction programme for elected members in place.
Does my council understand
any specific areas of skills
shortages that risk delivery of its
objectives? Eg social care,
facilities management
• Refreshed workforce plans, including leadership and
succession planning are complete. Plans are going
through the committee cycle post recess.
• Induction programme for elected members in place.
Meeting local needs
Does my council understand the
changing demographic profile,
poverty levels, and cost of living
increases in our council area
and how this will impact on
demand for council services?
• The council monitors a range of demographic and
socio-economic indicators for South Lanarkshire,
including poverty and cost-of-living indicators.
• Fact-sheets were prepared to inform the development
of the new Council Plan and the Community Plan.
• Key facts about South Lanarkshire can be accessed
through the council’s website and statistical profiles
for small areas (data zones, communities, wards) can
be generated via an online tool.
• These data sources are used extensively by
Resources in planning and delivering services.
Does my council have data and
an understanding at a local level
of the impact of the pandemic
on different groups, in particular
how inequalities have been
exacerbated?
• The Council is keeping abreast of current research to
ensure our response is timely and effective.  The
changing labour market/employability needs and
possible methods of addressing these are examples
of using local data to improve understanding and
supports. 
Does my council have plans in
place to address these unequal
impacts?
• Equality Impact Assessments underpin key decisions
and consultation takes place regularly.
• Putting people first and tackling inequality is one of
the priorities within the Council Plan 2022-27 and this
is translated into specific actions at Resource level
through the annual Resource Planning process.
Does my council have plans in
place to address key priorities
and areas of reform, including
social care and climate change?
• The Council Plan articulates the Council’s priorities
(People, Progress and Planet) and what it will do to
improve outcomes that matter to the people of South
Lanarkshire.  Key areas of reform are taken into
consideration through the annual Resource Planning
process, which identifies the actions Resources will
take in the coming year to progress the aims of the
Council Plan and respond to changes in the external
environment.
• Action on climate change is embedded within the
Council Plan and fully articulated in the Council’s
Sustainable Development and Climate Change
Strategy 2022-27.    
58

Page 59

Community empowerment and collaboration
How well is my council involving
communities and citizens in
driving recovery plans and
reshaping services? What
needs to improve?
• The Council is leading on the development of
community led plans, and community (locality)
partnerships on behalf of the community planning
partnership, to support the redesign of service
delivery for the Council and partners. These groups
allow for greater connection with communities,
accountability by partners and scrutiny of progress
being made. Work is under way to identify how
services can be planned and delivered at locality
level.  This is an area of work which is progressing at
pace, but engagement across South Lanarkshire can
still be strengthened and more communities
encouraged to become involved in planning.
How well is my council
collaborating with local partners,
including the third sector in
planning, and delivering
services?
• Through the Community Planning Partnership, the
Council collaborates robustly with local partners from
the public, private and third sectors on the planning
and delivery of services.  Work is also under way
through the Community Wealth Building strategy to
engage partners, in particular from the third sector, in
planning and designing services that support the
inclusive economy and plural ownership. 
59

Page 60

60

Page 61

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 29 November 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Best Value Assurance Reports (BVAR) Published by
the Accounts Commission 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
⧫ provide an overview of the recent BVAR reports published by the Accounts
Commission
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
 that the contents of the report be noted.
[1recs]
3. Background
3.1. South Lanarkshire Council was audited by Audit Scotland in October and November
2018, with the final report being published by the Accounts Commission on 28 March
2019. 
3.2. South Lanarkshire Council considered the BVAR at its meeting on 26 June 2019.  An
action plan was presented to Council for approval, addressing each of the BVAR
recommendations. 
3.3. On 19 September 2019, the Forum agreed to consider summaries of BVAR reports
as they are published by the Accounts Commission, in order to place the South
Lanarkshire audit in context and keep members informed about noteworthy Best
Value developments elsewhere.  
3.4. This report summarises the key themes and recommendations from BVARs
published since the last meeting of the Performance and Review Scrutiny Forum,
namely:- 
⧫ Angus Council (published 5 July 2022)
⧫ Falkirk Council (published 13 January 2022)
⧫ Shetland Council (published 25 August 2022)
⧫ Comhairle nan Eilean Siar (published 29 September 2022)  
6
61

Page 62

4. Summary of Key Messages and Recommendations
4.1. The key messages for Angus Council are:- 
⧫ The council has demonstrated a good pace of improvement since the last Best Value
report in 2016. It has reshaped services and is an organisation that is focused on its
priorities, working well with partners and keen to learn from good practice. 
⧫ The council and its partners have a clear vision for Angus. There is strong
partnership working and collaboration. Partners across Angus worked well together
to deliver services to those most in need during the Covid-19 pandemic. The council
is looking to learn from others how to engage effectively with communities on the
service redesign required. 
⧫ The pandemic has increased existing inequalities, hitting the most disadvantaged
groups hardest. Reducing inequality is a priority for the council and it is engaged in a
range of local projects to provide support and increase opportunities for its most
disadvantaged citizens. 
⧫ The leader of the council and chief executive provide effective leadership. Officers
and members have constructive working relationships. Effective arrangements are in
place to support decision-making and public scrutiny. Elected members have worked
together to make difficult decisions to deliver financial sustainability. 
⧫ Angus Council has effective financial management and medium-term financial
planning but has yet to fully develop its long-term financial plan. The council has
delivered significant financial savings in recent years through its Change
Programme, including comprehensive service reviews. Now increasing financial
pressures mean even more radical change is required to the range and scale of
services and how they are delivered. 
⧫ Annual performance reports are used to inform elected members and the public of
progress against council priorities. These reports are improving year on year, but
performance reporting needs to be more frequent to help drive improvement. Clearer
links between performance data and the impact of improvement actions is also
necessary. 
⧫ Progress in embedding a council-wide performance management framework to drive
improvement activity has been slow. Covid-19 disrupted progress. Further change is
needed if the council is to realise its ambition to be a performance-led council. 
⧫ The council’s performance has improved or been maintained across three of the four
key priority areas within its Council Plan. But in its priority area of the local economy,
where many indicators do not have performance information available, there were
already challenging performance issues before March 2020. 
⧫ The Local Government Benchmarking Framework indicators for 2021/22 show a
mixed picture, with good performance in areas such as waste management
alongside the need for improvement in the key area of housing. The proportion of
indicators in the top quartile is the highest since 2016/17. 
⧫ Across the majority of areas the people of Angus are more satisfied with their council
services than the Scottish average. 
⧫ The Angus Health and Social Care Partnership is a key partner for the delivery of
health and social care services. Good progress has been made in shifting care from
hospitals to community and home-based care settings, but changes in the demand
for care and recruitment challenges are resulting in unmet need. New models of
service delivery are being introduced, but further change is needed to ensure
services remain financially sustainable  
62

Page 63

4.2 The recommendations for Angus Council are that:- 
⧫ The council and Angus Health and Social Care Partnership (AHSCP) must develop
and deliver significant savings plans over the next few years to secure financial
sustainability. This will require changes to the range and scope of services being
delivered.
⧫ The council needs to work better and more meaningfully with communities to engage
with them to identify needs and opportunities and implement service changes that
deliver the required savings.
⧫ The council should complete its implementation of the Performance Led Council
programme (PLED) which will improve the use of performance information and better
demonstrate the impact of improvement actions. 
⧫ The council should introduce its partially developed long-term financial planning
framework. 
4.3 The key messages for Falkirk Council are:- 
⧫ In its last Best Value report in 2018, the Accounts Commission said that the council
would need strong leadership to make the necessary step change in its pace of
improvement. Since then, the council has taken a range of actions to improve
leadership and develop an improvement culture. However, elected members and
the corporate management team have not yet demonstrated the collective
leadership required to drive the change necessary to deliver the council’s priorities.
The council has made insufficient progress on key aspects of Best Value, including
improving financial sustainability, performance management and reporting,
community empowerment and equalities. It has only recently begun to take forward
developments in these important areas.
⧫ The council established its Council of the Future (COTF) programme for
transforming the way it works in 2017, but it has still to make a significant impact on
services and savings. After commissioning a review from an external consultant in
2020, senior officers have recently implemented substantial changes to how they
manage the transformation programme. But the pace and depth of the
transformation programme need to be significantly improved 
⧫ The council has a medium-term financial plan, but this does not identify how it will
address the full extent of its projected £70 million funding gap over the next five
years. Elected members typically opt to use reserves to balance annual budgets
rather than taking more difficult decisions within savings options proposed by
officers. This is not sustainable. 
⧫ While the council has appropriate governance arrangements and good working
relationships between senior officers and elected members across the political
parties, significant delays in elected members taking some key decisions are
impacting on the council’s pace of change. Elected members need to make difficult
decisions quickly about the future shape of services and show better collective
leadership with the corporate management team to deliver the necessary change.
We expect all members to work together, and with officers, to fulfil the council’s duty
of Best Value. 
⧫ The council performs well in several key services, and performance continues to
improve. Moreover, it is actively working to address areas in which performance is
poorer. In 2019/20, its performance in 60 per cent of published Local Government
Benchmarking Framework (LGBF) indicators was above the national average. The
people of the Falkirk Council area are, however, less satisfied with the council’s
performance and services than in other areas of Scotland. Previously highlighted
weaknesses in the performance information reported to the public and to
committees for effective scrutiny have recently begun to be addressed.  
63

Page 64

⧫ The council has not been effective in ensuring that equalities are embedded across
the organisation. Following a review in 2019/20, the council is responding to several
significant weaknesses including: the absence of a governance framework, the
need for self-assessment, a focus on reviewing outcomes and improving reporting
progress against its statutory requirements.
⧫ The council has decided to wind up the Falkirk Community Trust and bring sport,
leisure and cultural services back in-house from April 2022. The council sees long-
term benefits to this decision but the additional costs it will incur pose a significant
risk to value for money unless the council takes difficult decisions quickly. The
council has begun reducing total staffing costs to mitigate this risk.
⧫ The council has strong and positive working relationships with its community
planning partners and these have supported an effective joint response to Covid-19
as well as important new developments, such as the Falkirk Investment Zone.
However, the Community Planning Partnership (CPP) has not been able to
demonstrate whether it is delivering positive outcomes for its communities. It is
working to address this through reporting progress against its new Falkirk Plan,
published in November 2021. It has also failed to develop locality plans, despite
legislation requiring them to be complete more than four years ago. This is now
being taken forward as a priority.
⧫ Recently there has been close joint working between the council, the Health and
Social Care Partnership (HSCP) and NHS Forth Valley in responding to the Covid-
19 pandemic. This has improved the effectiveness of the Falkirk Integration Joint
Board (IJB) and enabled it to make progress in shifting the balance of care.
However, NHS Forth Valley has yet to fully integrate key services. This falls short of
the expectations within legislation and reduces the IJB’s ability to achieve
transformational change.
⧫ The council has made limited and slow progress in empowering its communities in
response to the Community Empowerment Act 2015, but this is now a greater
priority. It introduced community choices, a participatory budgeting scheme, during
2021. The council has also recently strengthened its capacity to work better with
communities. This, together with the response to Covid-19, has resulted in a
positive shift in its approach and culture in engaging and working with communities
in the last two years.
⧫ The council responded well to the immediate challenges of the Covid-19 pandemic,
supporting and working with its communities, including using their views to develop
a new vision and priorities for the recovery from Covid-19. It is aligning its plans,
transformation programme, and performance reports around its three key priorities
(Communities, Enterprise and Innovation) and has begun making good progress in
improving its use of digital technology in line with its priority of becoming more
innovative. 
4.4 The recommendations for Falkirk Council are that:- 
⧫ Elected members and senior officers need to work more constructively together to
lead the council more effectively and decisively. All elected members need to
recognise that they have a responsibility to deliver Best Value, and they need to
work together, and take difficult decisions in a timelier manner to allow the council
to progress with its agreed priorities. 
⧫ It is crucial that the council makes far greater progress in delivering its
transformation programme and in making savings, given the scale of the
challenges it faces. To do this:-
- as previously recommended in 2018, the council’s chief executive and senior
officers need to lead the COTF programme more effectively
- the council needs to adopt a multi-year approach to budgeting that supports
transformational change 
64

Page 65

- the council must ensure that all staff are fully engaged in the transformation
programme, and that budget holders are clear on expectations to deliver the
planned savings and are held to account
- elected members need to be provided with better information more frequently
about the status of the COTF projects, the savings delivered and projected
savings to support better scrutiny
⧫ The council should continue to improve its approach to reporting performance to
elected members and the public to support more effective scrutiny. To do this the
council needs to:-
- add more commentary to reports to explain how its performance compares with
previous performance and other councils
- add more commentary to its plans to explain how it will address areas of poorer
performance
⧫ The council needs to better manage its capital programmes to deliver planned
projects.  
⧫ The council and its community planning partners need to improve how they
manage and report their performance. To do this they need to:-
- determine clear outcome milestones for the new Falkirk Plan
- improve performance reporting to enable better scrutiny of performance and
more focus on areas in which improvement is needed
⧫ The council and its community planning partners urgently need to develop and
implement locality plans to allow them to better focus on the needs of local
communities. 
⧫ The council and its community planning partners need to embed their new
approach to community engagement and empowerment. To do this they need to:-
- make community engagement an integral part of service improvement and
delivery
- apply the lessons learned from effective engagement activity across all council
services and CPP activities 
- focus on the timely delivery of the actions agreed and report on progress
- clearly communicate the results of, and the council’s response to, community
consultation
- support community groups in the completion of asset transfers, participation
requests and participatory budgeting initiatives
⧫ The council needs to ensure that it can deliver the benefits envisaged from bringing
the services provided by the Falkirk Community Trust in-house by making the
difficult decisions required to realise savings
⧫ The council should act to fully embed equalities across the council and comply with
statutory requirements. 
4.5 The key messages for Shetland Council are:- 
⧫ The council has not yet demonstrated that it is meeting its Best Value duty in a
number of important areas. Across its services and activities, the council can point to
examples of good practice, but it has been slow to improve its plans for financial
sustainability, its performance management and reporting, its transformation
programme and aspects of its community engagement and empowerment. While
there has been some very recent progress, the council’s prospects for making the
changes needed are uncertain. The elected members need to increase their
ambition, pace and focus to deliver in these important areas. 
⧫ Shetland Islands Council faces specific challenges relating to the make-up and
distribution of its population, its topography, workforce and the economy of the
islands. The council’s strategic plan, Our Ambition, reflects these challenges and
opportunities and sets a clear vision for the council and its communities. The plan’s
aims are shared by partners.  
65

Page 66

⧫ The council’s elected members and senior management have good working
relationships, but they are not yet providing the strategic leadership needed to
coordinate and drive forward plans. Financial plans, asset improvement plans and
workforce plans are not clearly linked to the council’s priorities in Our Ambition. 
⧫ The council’s services perform well, with national benchmarking data showing that
performance improved in over half of the relevant indicators in the last five years.
Shetland also has some of the highest service satisfaction scores in Scotland. Where
service performance is weak, there are examples of the council taking action to
improve. 
⧫ The council’s own performance management and reporting systems and
arrangements are not well developed and inconsistent, with a lack of performance
indicators and targets. There have been some recent signs of improvement. 
⧫ The council has long-term and medium-term financial plans in place, however, there
is an estimated funding gap over the next five years of between £61.2 million and
£142.1 million. There is no clear link to the council’s Change Programme, and
therefore no clear plan of how the required savings will be made. The council is
therefore unable to demonstrate that it is financially sustainable in the medium to
long term.
⧫ The council has been slow to deliver on transformation with a lack of pace and
urgency to move it forward. The Change Programme has been put in place but is
piecemeal and lacks sufficient resources. 
⧫ The council and its partners responded well to the challenges of the Covid-19
pandemic. There is a good culture of the council and its partners working together –
that includes between the council and the NHS, and with the private and voluntary
sectors. The Community Planning Partnership is committed to reducing inequalities
but outcomes for Shetland’s population are mixed. 
⧫ The council has a good understanding of the communities it serves but is not
engaging with communities in a systematic way. There was no consultation on Our
Ambition or the budget. 
⧫ The council is making good progress with implementing some aspects of the
Community Empowerment Act, and is working with partners to support communities
to become more resilient. Progress on implementing other aspects of the Act, such
as the development of locality plans, has been slow. 
4.6 The recommendations for Shetland Council are that:- 
⧫ The council should improve performance management and reporting by:-
- ensuring performance indicators are in place for plans and strategies at the time of
their development
- setting targets for its performance indicators as appropriate and in a timely manner
- ensuring annual performance reporting is balanced, uses a mixture of qualitative
and quantitative information (including recently agreed performance indicators)
and clearly draws out areas for improvement and associated improvement actions
- ensuring monitoring is in place for the council’s early intervention and prevention
projects
⧫ Elected members should work with council management to set out how it will meet the
estimated funding gap
⧫ The council should improve how it involves elected members in budget-setting.
⧫ The council needs to fully embed its Change Programme by:-
- identifying, developing and aligning its supporting projects and activities 
- setting clear timescales 
- fully resourcing its work including the PMO Team ensuring there is a dedicated
core hub for its work
- creating a clear plan of how it will address savings identified in the MTFP  
66

Page 67

⧫ The council should align all plans and strategies under Our Ambition to meet its
priorities, specifically:-
- workforce planning
- the Asset Improvement Plan
- financial planning
- the Change Programme
⧫ In respect of community engagement, the council should:-
- engage communities on key strategic plans and developments, including the
council plan and annual budget
- demonstrate how the results of community engagement exercises have fed into
plans and services
- ensure locality plans are in place.
⧫ In respect of impact assessments, the council should develop a consistent approach
in carrying out EIAs. 
4.7 The key messages for Comhairle nan Eilean Siar are:- 
 Comhairle nan Eilean Siar has not yet demonstrated that it is meeting its Best Value
duty in a number of important areas. It has implemented successful initiatives and
shows good practice in community engagement and in supporting the local
economy, but the pace of wider-scale change and improvement has been slow. The
Comhairle’s prospects for achieving the improvements needed are currently
uncertain and will be influenced by its ability to successfully manage its finances,
workforce and leadership capacity. 
 Elected members and the corporate management team work well together but need
to provide stronger strategic direction and leadership. In doing so they should identify
clear priorities and planned actions for achieving the change and improvement
needed. The community planning partnership has an important oversight role and
needs to renew its overall strategy and focus. 
 The Comhairle does not have an effective medium or long-term financial strategy
that links to transformation, workforce and asset planning. It has only partly realised
its ambitious savings anticipated from service redesign. The Comhairle has had the
largest decrease in funding in real terms of any Scottish local authority in recent
years. In the absence of a detailed financial strategy, the Comhairle is not yet able to
demonstrate that it will be able to meet the significant financial challenges it is facing
over the medium to longer term. 
 The Comhairle is a strong advocate for the Outer Hebrides and collaborates well with
partners, national agencies and other rural and islands councils. The Islands Growth
Deal sets a template for sustainable growth, building on the islands’ unique energy
potential. 
 Depopulation and difficulties recruiting staff are a critical challenge to sustaining
services on the islands. The Comhairle should ensure it has the leadership capacity
to fulfil its ambitious plans for the economy and repopulation. It is currently updating
its workforce and organisational development plans. 
 Service performance and public satisfaction with services has declined overall in the
past five years. There are significant challenges in social care and tackling fuel
poverty. The Comhairle performs well in education services and in supporting the
local economy and it has a successful apprenticeship programme. The Comhairle
together with its partners responded well to the Covid-19 pandemic.
 Elected members and officers need to have more focus on targeted performance
management, improvement and self-evaluation. Public performance reporting needs
to be more accessible and include progress with improving outcomes for the people
of the islands. 
67

Page 68

 Social care services face specific recruitment and workload challenges. Funding and
resourcing issues have led to uncertainty over the Comhairle and Integration Joint
Board’s (IJB) delivery of a flagship health and social care facility. 
 Elected members understand community issues. The Community Planning
Partnership has local plans in place for areas of priority need. The Comhairle is
making good progress with some aspects of the Community Empowerment Act and
supports communities in making local spending decisions on the use of Crown
Estate funding 
4.8 The recommendations for Comhairle nan Eilean Siar are that:- 
 The Comhairle should identify clear and specific overall priorities and actions for taking
forward its vision. 
 Elected members should ensure they provide strategic oversight and challenge to
progress the Comhairle’s vision and priorities. 
 The Comhairle should develop medium to long-term financial planning and strategic
workforce and asset management planning. 
 In developing capital projects, including its community hub proposals, the Comhairle
should ensure projects are supported by robust business cases and that lessons are
learned from the Goathill project in areas such as funding and resourcing. 
 The Comhairle should improve its process for identifying and realising savings
opportunities, including opportunities from cross-council and partnership working. It
should ensure that opportunities for digital efficiencies are fully explored. 
 The Comhairle and partners should develop the LOIP alongside a clear performance
management framework to deliver achievable shared outcomes. 
 The Comhairle should develop ongoing training opportunities for members and
officers, including making equalities training mandatory for all staff and increasing
members’ uptake of training. 
 The Comhairle should develop and communicate its area working arrangements more
clearly, building on the good practice already in place. 
 The Comhairle should improve communications throughout the council, including
communicating the Comhairle’s priorities. 
5. Next Steps and Recommendations
5.1. All BVAR reports and recommendations are available on the Audit Scotland website. 
5.2. Further reports will be brought to the Forum as these BVARs are published, to keep
members informed on Best Value themes, topics and developments elsewhere in
Scotland. 
6. Employee Implications
6.1. There are no employee implications. 
7. Financial Implications
7.1. There are no financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. There are no risk implications as a result of this report.  
68

Page 69

10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
17 October 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 None 
List of Background Papers
 Angus Council BVAR published by the Accounts Commission on 5 July 2022
 Falkirk Council BVAR published by the Accounts Commission on 13 January 2022
 Shetland Council BVAR published by the Accounts Commission on 25 August 2022
 Comhairle nan Eilean Siar BVAR published by the Accounts Commission on 29
September 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Neil Reid, Research and Improvement Manager, Finance and Corporate Resources
Ext:  4618  (Tel:  01698 454618)
Email:  neil.reid@southlanarkshire.gov.uk
69