Democracy Spraffa

Agenda Document Pack - Performance and Review Scrutiny Forum - 16/08/2022

South Lanarkshire Council · 16 August 2022
Back to Performance and Review Scrutiny Forum — 16 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 08 August 2022 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 16 August 2022
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Joe Fagan (Chair), John Anderson, Maureen Chalmers, Gerry Convery, Maureen Devlin, Richard
Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
Item(s) for Consideration 
2 Council Plan Connect 2017 to 2022 Quarter 4 Progress Report 2021/2022
Report dated 1 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
3 - 52 
3 Local Government Benchmarking Framework 2020/2021 Results and
Action Plan
Report dated 27 June 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
53 - 140 
4 Local Government Benchmarking Framework Update
Report dated 21 July 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
141 - 146 
5 Annual Performance Spotlights 2021/2022
Report dated 12 July 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
147 - 158 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
2

Page 3

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 16 August 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council Plan Connect 2017 to 2022:
Quarter 4 Progress Report 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Council Plan Connect Quarter 4 Progress Report 2021/2022, for the
period 1 April 2021 to 31 March 2022
[1purpose]
2. Recommendations
2.1. The Forum is asked to approve the following recommendations:-
[]
(1) that the Connect Quarter 4 Progress Report 2021/2022 summarised at
paragraph 4.5. and attached as Appendix 1 of this report, be noted;
(2)  that the key achievements, as detailed in paragraph 4.6. and 4.7. of this
report, be noted; and
(3)  that the additional scrutiny of changes in measure status between Quarter 2
and Quarter 4, as summarised at paragraph 4.8. of this report, be noted. 
[1recs]
3. Background
3.1. The Council Plan Connect covering the period 2017to 2022 was approved by the
Executive Committee on 8 November 2017 and by the full council on 8 December
2017.  The plan sets out the Council’s vision, values, ambitions and priorities for the
5 year period. 
3.2. As part of the performance reporting arrangements introduced in 2007, it was
agreed that progress reports on the Council Plan would be provided at the mid-year
point (Quarter 2) and at the end of the financial year (Quarter 4).   
3.3. Despite the easing of social distancing and other restrictions, the Council continues
to face financial and other impacts resulting from Covid. At times during the
pandemic, a number of services had to be suspended or reduced due to
government advice and the Council was also obliged to redirect resources so that it
could deliver vital new services and supports for individuals, communities and
businesses. There was an inevitable impact on performance in some areas, with
some effects ongoing. 
4. Quarter 4 Progress 2021/2022
4.1. The Council Plan offers flexibility, both at the Resource level and from one year to
the next, in the choice of actions and measures required to deliver the Council’s
priorities.  Alongside this flexibility, however, comes the requirement to ensure that
the golden thread from Council Plan to Resource Plan remains unbroken. 
2
3

Page 4

4.2. The reporting framework for the Council Plan identifies key measures within
Resource Plans which are taken and combined in a Connect report to provide a
balanced picture of council performance against Connect priorities. 
4.3. A total of 264 measures have been identified from the 2021/2022 Resource Plans. 
Of those, 108 (41%) have been nominated as key strategic measures for reporting
progress against Connect. 
4.4. Progress to date against all measures is contained in the Connect Quarter 4
Performance Report 2021/2022, attached as Appendix 1.  This report has been
produced from the Council’s performance management reporting system IMPROVe
and uses a traffic light format, with the following definitions, to give a status report
on each measure:- 
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor
shortfall against target
Red There has been major slippage against timescale or major
shortfall against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when
available
Contextual Included for ‘information only’, to set performance information in
context 
4.5. To ensure adequate scrutiny of performance across all Resources, individual
Resource Committees receive details of all ‘red’ measures relating to that Resource
including management actions, where applicable. In addition, the Council’s
Performance and Review Scrutiny Forum may consider those measures reporting a
‘red’ and/or ‘amber’ status across all Resources. 
The overall summary of Connect progress for 2021/2022 is as follows and
performance should be considered in the context of the impact of responding to
Covid 19:- 
Status Measures
Statistical  Project  Total %
Blue N/A 16 16 15%
Green  33 40 73  68%
Amber  5 6 11 10%
Red     1 1 2  2%
Report later/Contextual 6 0 6  5%
Totals  45 63 108 100 %  
(Data correct as 1 August 2022) 
4.6. Progress for 2021/2022 on each of the 4 Connect Priorities and the related
achievements have been summarised in the following tables:- 
4

Page 5

4.6.1.
Connect
Priority
Ensure communities are safe, strong and sustainable 
Number of
measures
Blue Green Amber Red Report later Total
4 23 5 2 2 36
Achievements The Larkhall Town Centre Strategy and Action Plan was approved at
Community and Enterprise Resources Committee in May 2021. The five
year strategy is aimed at developing and coordinating public, private and
community-led work in the town centre to ensure it stays lively and
community focused.
The action plan considers potential activity shaped at revitalising the town
centre in six distinct areas of concern:
• Business support
• Parking review
• Streetscape review
• Town centre maintenance, signage review
• An organised voice
• Safe events (where and when possible) 
A litter strategy consultation was launched in August 2021 to capture the
views, ideas and issues experienced by communities across South
Lanarkshire.
The consultation document also lays out the aim to develop a range of
plans, policies and initiatives, all designed to drive our commitment to
preventing wide ranging litter issues including:
• Litter Prevention 
• Dog Fouling 
• Fly Tipping 
• Graffiti 
The results will directly influence the council's proposed Litter Strategy
2022-27, as agreed by the Climate Change and Sustainability committee in
February 2021. 
16 additional local nature reserves (LNRs) were approved by the Planning
Committee in October 2021, adding to the existing one at Langlands Moss.
By declaring these sites as LNRs, not only do we protect the natural
heritage, but it means people can learn about and enjoy nature close to
their homes. 
The Climate Emergency Community Grants scheme, funded by the
Climate Challenge Fund, was launched in January 2022. The scheme is
offering grants of up to £2,500 to help community groups turn their ideas
into community projects. This is a 2-year programme with just under
£95,000 to be allocated to groups each year. Progress and impact of the
funding will be monitored and reported via the Sustainable Development
and Climate Change Committee. 
800 fruit trees have been planted at 13 locations across South Lanarkshire,
in memory of local people who lost their lives in the Covid-19 pandemic.
(This was the estimated number of deaths at the time the decision was
made to plant the trees.) Funding for the project came through the council’s
Food Strategy Support Fund. The tree planting improves biodiversity, the
amount of tree canopy in the area, and carbon removal. Local community
groups and schools at each of the 13 locations were invited to help with
planting arrangements and will make use of fruit crops in the future.  
The Community Growth Area (CGA) sites in Newton, Ferniegair, Hamilton
and Larkhall have had significant completions during 2021-22, and the
main part of East Kilbride has also now commenced. On average, each
CGA is building faster than anticipated which shows that there is a demand
for new build private housing across South Lanarkshire. In addition, the
'affordable' elements associated with the CGAs continue to add to the
social rented stock helping the council meet its affordable housing need
targets. 
5

Page 6

Social Work Resources provided access to timely support and
interventions with 100% of clients seen within 2 days of their Drug Testing
and Treatment Orders commencing.  Performance continues to exceed the
95% target.
In addition, 96% of drug and/or alcohol clients who were referred for
treatments and/or psychosocial intervention started treatments within 3
weeks of being referred.  Performance continues to exceed the 90% target. 
98.1% of response repairs on council dwellings were completed on time. 
The council’s website was updated to comply with Web Accessibility
legislation that became law on 23 September 2020, enhancing the
customer experience and ensuring no action against the council by the
Equalities Commissioner.
The council undertook its general services budget consultation process
between December 2021 and January 2022 to allow feedback for Members
prior to approving the Council’s budget.
The first Community Partnership in South Lanarkshire has been
established in the Cambuslang and Rutherglen areas. 
4.6.2.
Connect
Priority
Promote sustainable and inclusive economic growth and tackle
disadvantage
Number of
measures
Blue Green Amber Red Report later Total
2 19 3 0 1 25
Achievements Following on from approval of a Community Wealth Building (CWB)
Strategy in March 2021, a CWB Commission was established to drive
forward CWB in South Lanarkshire.  The first meeting of the Commission –
which has representation from across the political spectrum and involves
our CPP Partners – took place on 31 August 2021. 
The new park and ride facility opened in Cambuslang, offering 256 parking
spaces, including new electric vehicle charging infrastructure. This will
make it easier than ever to switch from car to train and help to make electric
vehicles a viable option for more road users. 
Previously a derelict site, it is now an asset to the area improving parking in
the centre of Cambuslang, supporting sustainable travel and adding to
environmental improvements. 
During quarter two, Lanarkshire Women in Business (LWIB) was launched,
following a successful year-long pilot initiative that ran during 2019-20. The
first event was held digitally on Wednesday, 8 September 2021 and paves
the way for a planned new programme of female focused business support,
that will kick-start during spring 2022. 
1,316 businesses have been supported by Economic Development (via
grants, loans or advice), including 1,063 businesses which have been
helped through the new Business Gateway contract. 
Since March 2021, the new Business Gateway contractor, ‘Elevator’, has
worked with 1,477 companies – 1,000 new starts and 477 existing
businesses - providing free support and impartial advice to help improve
growth and performance through increased turnover, jobs created or
safeguarded, more efficient operational activities and improved productivity.
In the first year of the contract, the service has:
• run 175 on-line workshops covering a wide range of topics
• delivered a Flagship Accelerator course helping early-stage business
owners to fast track their business offering, growth, and investment
potential 
• delivered an Academic Accelerator course in partnership with UWS
supporting current and recent graduates to develop their business ideas
• provided tailored support to key sectors of the economy, including
tourism, food and drink, and construction 
There has been a reduction in the number of road casualties in South
Lanarkshire. In 2021, there were 252 road casualties, according to the
6

Page 7

provisional road casualty figures, which is a significant reduction from 317
casualties in 2020, and 431 in 2019. These annual figures are an essential
indicator to help us spot any areas of concern. 
We are working with a range of external employers and are seeking
innovative approaches to filling council vacancies through a new
employability delivery model that fast tracks a potential pool of suitable
unemployed clients participating on employability programmes into council
job opportunities. We have successfully secured 8 jobs in Council
Homecare positions through this new model and seeking to roll this out to
Classroom Assistants, Admin Clerical posts in Social Work, Track and Trace
jobs, Facilities, Driving (HGV) etc. This year we intend to develop and
operate a bank staff system that will fully connect employability programmes
with council job vacancies. 
The percentage of pupils entering positive destinations in South Lanarkshire
increased from 94.8% the previous year to 96.2% and is above the national
level of 95.5%. 
The roll out of the ‘care experienced employability pilot’ continued to support
care experienced young people aged 16-24 to develop their skills and
experiences to achieve sustained positive destinations with 5 young people
supported to take up Modern Apprenticeship posts with the Council. 
The Foundation Apprenticeship (FA) and GradU8 programmes have
continued to be delivered throughout academic year 2021-22. All learning
was delivered in person in college or FA hubs. The majority of young people
completed as planned despite the additional challenges presented by the
Covid-19 pandemic. 
4.6.3.
Connect
Priority
Get it right for children and young people
Number of
measures
Blue Green Amber Red Report later Total
5 5 2 0 2 14
Achievements The implementation of Phase 5 of the rollout of additional hours for Early
Learning and Childcare 1140 hours, allocated to eligible children, was
completed with over 7800 children and families accessing provision. 
The percentage of young people leaving school with 5 or more Scottish
Credit and Qualification Framework awards at level 6 (Higher) or better
increased from 40.6% the previous year to 44.0% and is above the national
level of 42.1%. 
A refreshed Local Child Poverty Action Report and summary was published
to ensure effective delivery of tackling poverty policy and raise awareness of
the priorities across all partner organisations. 
82% of all reports submitted to the Children’s Reporter were sent within
agreed 20 day timescale – maintaining good performance by exceeding the
75% target. 
Social Work Resource continues to ensure that all looked after children and
young people are cared for in the most appropriate setting, with 90% of our
looked after children being cared for in a community setting – exceeding the
target of 88%
Virtual adoption and fostering panels have been successful and we have
continued to approve new foster carers and run virtual preparatory groups. 
Whilst visits to carers have been restricted, we have maintained links via
virtual meetings, regular newsletters and social media posts. We are
exceptionally grateful for our carers’ strength, resilience and energy during
this difficult time. Adoption enquiries have shown a significant increase
during the pandemic. This trend is reflected nationally, and it is evident that
this may be related to the restrictions in access to fertility treatment. 
We continue to provide appropriate accommodation for homeless
households with children. 
7

Page 8

4.6.4.
Connect
Priority
Improve health, care and wellbeing
Number of
measures
Blue Green Amber Red Report later Total
2 24 1 0 1 28
Achievements Although the new Springhall Community Centre was handed over in March
2020, the facility only opened to the public at the end of June 2021, in line
with Covid-19 restrictions.  Local people were heavily involved in the
planning and development of the £1m project, and the transformed centre
now offers a new inviting entrance area with reception desk, a community
hall, meeting and training facilities, IT suite and a new library.
The Tom Craig Centre in Law re-opened following major renovation works.
South Lanarkshire Council and South Lanarkshire Leisure and Culture
worked in partnership to plan and deliver the project, and the reopening
was a welcome boost to local recovery in the wake of Covid-19. With a
main hall, lesser hall, multipurpose room and kitchen, the hall plays a
central role in community life for the village and surrounding area.
The Adults with Incapacity (Scotland) Act 2000 places responsibility on
local authorities to visit adults on welfare guardianship orders.
94% of supervising officer visits for local authority and 95% of private
welfare guardianship orders were completed within timescales and
exceeded the target of 90%. 
Processes and procedures have been developed to support the allocation
of the Technology Enabled Properties in line with the Joint Working
Agreement (JWA).   The first bungalows were allocated to service users
late January/early February and feedback has been very positive.  
993 adaptations completed in Council Homes. 
Strategic Housing Investment Plan (SHIP) 2022-28 has been completed
and was approved at Housing and Technical Resources Committee in
September 2021. 
4.7. In addition to working towards the 4 Connect Priorities, the Council will continually
aim to improve and ensure effective and efficient use of resources, and that
business will be conducted with integrity and transparency and will operate to the
highest standards.  In order to monitor and report progress against these values,
Resource Objectives have also been identified, under the heading Delivering the
Plan and achieving Best Value. Progress on this and the related achievements
have been summarised in the following table:-   
Delivering the Plan and achieving Best Value 
Number of
measures
Blue Green Amber Red Report later Total
3 2 0 0 0 5
Achievements The 2022-23 financial strategy was approved in June 2021.  This paves the
way for finalising a budget for members to approve before March 2022,
following receipt of the local government settlement later this year.
The 2020-21 financial accounts were finalised in line with the normal
timetable, and the audit of the accounts is progressing well.  A clean audit
certificate was signed off on 17 November 2021.
Support and advice continues to be provided by finance teams in relation to
managing the ongoing impact and recovery from the pandemic during
2021-22. 
The Chief Social Work Officer is obliged to provide an annual report on key
challenges, developments and improvements across Social Work as well
as reporting on service quality and performance including delivery of
statutory functions. This was submitted to the Scottish Government in
September 2021. 
8

Page 9

A system of bulk communications was developed using a database of
personal email addresses so that SLC and SLLC employees who do not
have a council/SLLC email address are included in important Covid and
other mass communications.
Personnel services teams have adapted processes and arrangements in
response to Covid restrictions to enable HR service delivery to be
maintained and respond effectively to additional requests.
• The council achieved PSN cyber security certification
• A major milestone was achieved in the Caird datacentre exit project - all
Almada Street computer systems were successfully migrated to external
provider
• IT installations were completed for four Education new builds 
4.8. Scrutiny of change in measure status 
A further analysis introduced to aid scrutiny of performance, is to highlight and
explain all measures that have changed status from Quarter 2 to Quarter 4. A list of
all the measures falling into this category of further scrutiny is included at Appendix
2. On analysis of these, only 9 measures show a decline in performance, mainly
due to the Covid pandemic. The remaining measures have shown an improvement
in performance (18 measures). 
5. Employee Implications
5.1. The priorities noted within the Council Plan inform the Resource Plans and in turn
the Performance Appraisal process for individual employees. 
6. Financial Implications
6.1. Provision for meeting the Council Plan’s priorities is reflected in both the Revenue
and Capital budgets, and longer term, within the framework of the Council’s
approved Financial Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising from
this report 
8. Other Implications
8.1. The Community Plan 2017 to 22 was agreed at the Community Planning
Partnership Board on 11 October 2017.  A significant element of the delivery of the
outcomes in the Community Plan will come through the achievement of the actions
contained within Connect. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Equality Impact Assessments will be undertaken in line with the various actions
within Connect as appropriate. 
9.2. Many of the priorities, objectives and actions detailed within the plan reflect ongoing
work programmes implemented to address local and national priorities.  Extensive
consultation, therefore, has already taken place in relation to a significant proportion
of the priorities, objectives and actions outlined in the plan.   
Paul Manning
Executive Director (Finance and Corporate Resources) 
1 August 2022 
9

Page 10

Link(s) to Council Values//Priorities
The Council Plan 2017to 2022 reflects the overarching vision of South Lanarkshire Council
and details its values, priorities and objectives, including links to the Community Planning
Partnership. 
Previous References
Executive Committee 8 November 2017: approval of Council Plan Connect 2017-22 and
Executive Committee 24 June 2020: endorsement of mid-term review of Connect. 
List of Background Papers
Council Plan Connect 2017to 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Extension: 4904  (Phone: 01698 454904)
E-mail: tom.little@southlanarkshire.gov.uk 
Performance: www.southlanarkshire.gov.uk/performance       
10

Page 11

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 2 Aug 10:12
Quarter 4 : April 2021 - March 2022
(This represents the cumulative position to March 2022)
Performance Report 2021-22
South Lanarkshire Council
Connect
2
11

Page 12

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 2 Aug 10:12
Summary - number of measures green, amber and red under each Council Plan Priority /
Theme
Council Priority/ Theme Green Amber Red Report later /
Contextual
Total
Promote sustainable and inclusive economic growth and
tackle disadvantage
9 0 0 1 10
Get it right for children and young people 3 1 0 2 6
Improve health, care and wellbeing 10 1 0 1 12
Ensure communities are safe, strong and sustainable 11 3 1 2 17
Delivering the plan and achieving best value 0 0 0 0 0
Total 33 5 1 6 45
Page 1
12

Page 13

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Ensure communities are safe, strong and sustainable
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of lets to Urgent housing (UH) need
households
Although performance is slightly below target, there has been an
increase in the number of lets to urgent need from 1089 in 2020/21 to
1225 in 2021/22.
Amber 60.0% 56.6% 49.2% 51.4% 61.1%
% of homeless and potentially homeless
decision notifications issued within 28 days
of date of initial presentation (RP)
Target achieved. Green 98.0% 99.6% 99.4% 99.8% 99.8%
% of Housing Options interventions where
Homelessness prevented (RP)
Target achieved. Green 70.0% 73.5% 0.0% 0.0% 0.0%
% of new tenancies sustained for more
than a year  for all lets (SSHC)
Target achieved. Green 88.00% 93.40% 89.37% 90.08% 91.90%
% of response repairs completed on time Target achieved. Green 90.0% 99.1% 97.0% 96.0% 97.7%
% of council dwellings that are Energy
Efficiency Standard for Social Housing
(EESSH) (LGBF)
No target was set for EESSH 1 this year end as it was anticipated we
would be reporting on the new EESSH 2 standard.  However, the
Scottish Government published revised guidance stating SHQS element
35 should be measured against meeting the EESSH 1 standard.
Previous EESSH 1 target was 93.10%.
Contextual ------ 98.64% 91.10% 93.39% 93.88%
Percentage of all planning applications
approved
The approval rate for quarter four was 98.1%, which is the highest of the
year and continues to exceed the target figure of 95%. The overall figure
for 2021-22 is 97.1%, which is slightly up on the 96.2% for 2020-21.
Please note that the rolling target of 95% provides the service with
scope to refuse applications (only where the proposal does not comply
with policy).
Green 95.0% 97.1% 98.4% 96.9% 96.2%
Make an annual saving from using
recycled items as opposed to new through
the joint store (Equipu)
The cumulative total for recycled equipment for 2021/22 was:
No of items - 2511
Cost of items - £272,891
Value of items - £536,999
Since April 2021 there has been a saving for the Council of £267,296,
exceeding the annual saving target of £175,000.
Green 175,000 267,296 0 0 0
Page 2
13

Page 14

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Ensure communities are safe, strong and sustainable
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
95% of clients are first seen within 2
working days of a DTTO commencing
In quarter 4 there were 14 Drug Treatment and Testing Orders
commenced, all of which were seen within two working days of a DTTO
commencing.
In 2020/21 100% of clients were first seen within two working days of a
DTTO commencing.
Green 95.0% 100.0% 93.0% 100.0% 100.0%
90% of drug/alcohol clients start
treatment/psychosocial intervention within
3 weeks of referral
In quarter 4 there were 131 referrals, 127 (97%) of these referrals
started their treatment within 3 weeks of referral.
In 2021/22 there have been 636 referrals made to the service with 613
(96%) of cases, have started their treatment within 3 weeks of referral.
Green 90% 96% 93% 94% 97%
95% of Criminal Justice Social Work
reports submitted to Court by the due date
In quarter 4 98% (314 out of 321) of Criminal Justice Social Work
Reports were submitted to the court by the due date.
In 2021/22 99% (1242 from a total of 1256)of Criminal Justice Social
Work reports were submitted to Court by their due date.
Green 95.0% 99.0% 99.0% 98.0% 97.0%
Page 3
14

Page 15

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Ensure communities are safe, strong and sustainable
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
75% of reports submitted to the Children's
Reporter within 20 days
In quarter 4, 67% (68 out of 101) reports were submitted to the Scottish
Children's Reporters Administration within agreed timescales.
To date, 82% (314 out of 385) reports have been submitted to the
Scottish Children's Reporters Administration within agreed timescales.
Green 75.0% 82.0% 79.0% 71.0% 88.0%
Page 4
15

Page 16

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Ensure communities are safe, strong and sustainable
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Broad compliance with food law statutory
requirements secured in premises
The rating scheme used to determine broad compliance with food safety
requirements in food businesses operating within South Lanarkshire and
inspected by Environmental Services changed on 1 July 2019. The
previous food law rating scheme focused on broad compliance with food
hygiene requirements only, whereas the new scheme assesses overall
compliance with both food hygiene and food standards legislation.
Under the combined old and new food law rating schemes, 95% were
found to be broadly compliant in the fourth quarter of 2021-2022
(January - March 2022).  This equates to 2,564 food businesses.  Over
the full year, 93% were found to be broadly compliant with both food
hygiene and food standards legislation.
This compliance figure continues to exceed the annual target set for this
measure, and has increased gradually since the new food law rating
scheme has come into affect. This is due to the fact that the new food
law rating scheme allows Local Authorities to focus resources on high
risk and non-compliant businesses by conducting more frequent
inspections in these establishments.
Green 85.0% 93.0% 87.0% 87.9% 90.0%
Page 5
16

Page 17

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Ensure communities are safe, strong and sustainable
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of streets found to be
acceptable during LEAMS survey
This is a Local Government Benchmarking Framework (LGBF) indicator.
2021-22 data will not be available until January 2023.
2020-21 results show that South Lanarkshire Council continues to score
higher for its street cleansing service than the Scottish average, with
94.1% of streets surveyed found to be of an acceptable standard in
2020-21. This is down slightly from 94.8% in 2019-20, however we are
still above the Scottish average. It should be considered that since
March 2020 we have had to introduce a more fluid service to protect our
staff who have been working at the front line during the Covid-19
pandemic to continue to ensure that our streets remain clean and tidy,
bins are emptied, and fly tipping is removed. It should also be noted that
the Street Cleansing service were finalists in the 2021 APSE Service
Awards for the whole of the UK in the category of “Best performer in
Street Cleansing”.
Report Later 94.10% ------ 94.90% 94.80% 94.10%
Land Audit Management System grounds
maintenance score
LAMS measures the quality of grounds maintenance based on surveys
which are completed throughout the year. Taking all of this year's scores
into consideration (72, 72, 74 and 67), the overall LAMS score for
2021-22 is 71.3, which is slightly below the target of 72.0.
Amber 72.0 71.3 71.5 72.0 72.0
Percentage of total household waste that is
recycled
Measure is reported per calendar year. The figure for quarter four
(October to December 2021) was 37.21%.  This equates to 41.50% for
2021, which is higher than the 2020 figure (40.5%), but remains below
the target figure of 50.00%.
Higher residual waste tonnages collected at the kerbside due to
Covid-19 and home-working, high residual waste content in bulk uplifts
(black bag waste accepted), and more non-recyclable waste being
disposed of in Household Waste Recycling Centres, are all factors that
need to be taken into account when understanding the household waste
recycling performance.
Red 50.00% 41.50% 44.30% 46.40% 40.50%
Factoring collection rate An additional £0.5m in revenue was collected when compared to
2020/21 however the annual target was not met.  A number of payment
plans for rechargeable repairs have carried forward into 2022/23.
Amber 77.00% 73.00% 81.00% 78.10% 74.06%
Page 6
17

Page 18

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Get it right for children and young people
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Improve the attendance of children and
young people at school
Performance in South Lanarkshire increased from the previous year and
is above the target set.
Green 92.8% 93.4% 92.8% 92.9% 92.8%
Reduce the gap for positive destination
outcomes for those pupils in the most
deprived 20% data zones
The data must be viewed in the context of the ongoing Covid-19
pandemic and its impact on the initial destinations available to school
leavers.
Amber 3.4% 6.4% 3.2% 2.7% 4.3%
Percentage of pupils entering positive
destinations
The percentage of pupils entering positive destinations in South
Lanarkshire increased from the previous year and is above the target
set.
Green 95.6% 96.2% 96.4% 95.7% 94.8%
Level of primary school meal uptake (as
proportion of total primary school meals
which could be taken up over the period)
The level of uptake, up to and including P13, was 58.24%. Figures for
P14 are not yet available. Please note that school meal uptake figures
continue to be affected by Covid-19 and its impact on school
attendance.
Target shown is the 2019-20 (pre-Covid) level and is for contextual
purposes only this year.
Contextual 59.28% 58.24% ------ 59.28% 41.31%
Level of secondary school meal uptake (as
proportion of total secondary school meals
which could be taken up over the period)
The level of uptake, up to and including P13, was 36.31%. Figures for
P14 are not yet available. Please note that school meal uptake figures
continue to be affected by Covid-19 and its impact on school
attendance.
Target shown is the 2019-20 (pre-Covid) level and is for contextual
purposes only this year.
Contextual 47.33% 36.31% ------ 47.33% 24.38%
Number of lunches served in nursery
schools as part of new Scottish
Government Early Years Initiative
132,475 lunches were served during financial periods 10, 11 and 12.
This brings the year to date figure to 438,249. Target has been
exceeded.
Green 288,486 438,249 ------ 288,486 218,249
Improve health, care and wellbeing
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of adaptations completed in
Council homes
993 adaptations completed in Council Homes. Contextual ------ 993 979 848 476
Page 7
18

Page 19

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Improve health, care and wellbeing
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
No of households currently waiting for
adaptations to their home
Target achieved. Green 0 0 0 0 0
% of approved applications for adaptations
completed in year (SSHC)
All adaptations were approved, this measure is demand led. Green 100.00% 100.00% 93.00% 100.00% 100.00%
% of standard adaptations to council
houses within agreed appointment times
Target achieved. Green 97.0% 98.3% 93.0% 85.6% 92.4%
% of new build that meets needs of older
people (RP)
Target exceeded. Green 8.0% 20.0% 0.0% 0.0% 0.0%
90% of statutory supervising officer visits
completed within timescale for local
authority welfare guardianship orders
To date there were a total of 242 local authority welfare guardianship
visits due with 94% (228) being completed on time.
In quarter 4, there were a total of 60 local authority welfare guardianship
visits due with 87% (52) being completed on time.
Green 90% 94% 98% 93% 93%
90% of statutory supervising officer visits
completed within timescale for private
welfare guardianship orders
To date there were a total of 2321 private welfare guardianship visits due
with 95% (2198) being completed on time.
In quarter 4, there were a total of 489 private welfare guardianship visits
due with 91% (447) being completed on time.
Green 90% 95% 93% 86% 94%
Monitor the percentage of Planned
Discharge Dates that are met
In quarter 4, 78.1% of Planned Discharge Dates were met.  Although
performance remains below target this is an improving picture from
previous quarters.  Data is for South Lanarkshire residents treated in
University Hospital Hairmyres (UHH) only.  Data is an extract from
Trakcare system and is un-validated.
Amber 80.0% 78.1% 0.0% 0.0% 0.0%
Monitor the ratio of planned/unplanned
referrals received
In quarter 4, 71% of all referrals received to the Hospital Team were
planned.
To date, 71% of all referrals received were planned.
Green 70 71 0 0 0
Discharge 10 patients from hospital per
day
In quarter 4, performance around this measure improved, on average
35.7 patients who had a Planned Discharge Date were discharged per
day.  For 2021-22, 23.4 patients were discharged per day on average.
Data is for South Lanarkshire residents treated in University Hospital
Hairmyres (UHH) only.  Data is an extract from Trakcare system and is
un-validated.
Green 10 23 0 0 0
Page 8
19

Page 20

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Improve health, care and wellbeing
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Shift the balance of care and aim for no
more than 12% of our looked after young
people to be accommodated in residential
placements
As at March 2022, 769 children are looked after, 75 (10%) of these
children are looked after in a residential setting  including local authority
houses, secure accommodation and residential schools.  This position
has been consistent since 1 April 2021.
Green 12.0% 10.0% 0.0% 0.0% 0.0%
Page 9
20

Page 21

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Improve health, care and wellbeing
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Report the number of young carers
supported by Action for Children on a
quarterly basis.
Over the course of 2021-2022, the Young Carer Steering group has
taken forward the work overseeing the Action for Children contract as it
relates to Young Carers.
Additional staff have been recruited to fill vacancies and a part time post.
the part time post has been filled by someone with lived experience  of
being a young carer and has a breadth of knowledge and insight that
will be invaluable within the service.
A Driver diagram has been developed and a data collection plan is in
place.  Data shows an increase in the number of referrals and
statements being completed over the course of 7months than in the
previous year prior to Action for Children taking this over.  Regular inputs
to classes in year groups are now taking place which is leading to
greater awareness of the needs of young carers and the additional
challenges that they face in order that they live a life of experiences
equal to that of their non-young carers lives.  New processes have been
set up including referrals to money matters and uptake of this support is
being measured.  Other areas being explored are Weight management
and smoking cessation.
there are currently 119 young carers receiving support, either via 1:1 or
groupwork support.  Groups have worked with specific specialism
including and artist in order to offer stimulating and attractive
opportunities for young carers Action for children were able to access
additional funding which has made a positive difference to family. For
example funding was sourced from Morgan Stanley of £1,200  which
was used to purchase gifts.  The Nationwide Building Society within SLC
also provided funding.  Families were assisted with funding for white
goods and emergency payments for food from Iceland.  They also have
access to short breaks funding.
Work in relation to transitional support to young carers to Lanarkshire
Carers Centre for young adult carer support is being taken forward.
Eduction are devising a questionnaire for teaching staff which will
capture the level of knowledge and awareness of young carers.
AFC work in partnership with Over the Wal, who provide experiences for
the siblings of those children with serious illnesses and/or disability.
AFC have reviewed the Statement and consulted with young carers in
order that it continues to be user friendly.  They have also reviewed the
pathway plan.
Green ------ 2,021 0 0 0
Page 10
21

Page 22

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Improve health, care and wellbeing
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Columba 1400 experience will be taking place Easter 2022, this was
extended due to restrictions with Covid.
Feedback from families and young people has been very positive over
the course of the last year.
Promote sustainable and inclusive economic growth and tackle disadvantage
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of the road network resurfaced
during 2021-22
During quarter four, continuing progress has been made and a further
0.34% of the road network has been resurfaced, bringing the total for the
year to 2.9%, which exceeds the annual target of 2.4%.
This includes carriageway surfacing works undertaken as part of the
participatory budget funding.
Green 2.4% 2.9% 3.7% 3.4% 3.1%
Percentage of our road network that should
be considered for maintenance treatment
(Road Condition Index)
The Road Condition Index (RCI) results from the SCOTS (Society of
Chief Officers of Transportation in Scotland) survey for the period
covering 2019 to 2021 (published in January 2022), indicate that 29.7%
of our road network should be considered for treatment, compared to
our previous figure of 30.6%.
This is a further improvement, and our RCI figure for the network
condition is 4.5% better than the Scottish average (34.2%). This places
South Lanarkshire in 10th position for the 32 local roads authorities.
Green 30.6% 29.7% 31.2% 30.3% 30.6%
Number of unemployed people supported
via council-operated employability
programmes
We have supported 2118 people in total of which 1934 are unemployed
and 184 are employed
Green 1,000 1,934 2,135 1,322 1,348
Number of unemployed people gaining
sustainable employment
This one of the highest job outcome results seen in the past five years. Green 400 1,146 863 713 410
Page 11
22

Page 23

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Promote sustainable and inclusive economic growth and tackle disadvantage
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of unemployed people accessing
further education or training
Exceeded target Green 200
people
219
people
501 people 568 people 211 people
Number of business support interventions
per annum by Economic Development
(grants, loans or advice)
2,679 businesses have been supported during 2021-22. This includes
SLC business support, Business Gateway referrals and advice, and
businesses supported with Scottish Government grants administered by
Economic Development (excludes taxi drivers and operators grants).
As with the previous year, this number is embellished by the delivery of
Scottish Government Covid-19 funding.
Green 1,500 2,679 1,791 1,562 3,075
Number of jobs created or sustained per
annum as a direct result of Economic
Development intervention
The target for number of jobs created or sustained has been exceeded.
The majority of the results are due to safeguarding jobs in response the
the Covid-19 pandemic.
Green 350 1,095 812 943 ------
Page 12
23

Page 24

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Tuesday 2 August 2022
Council Plan Performance Indicators
Promote sustainable and inclusive economic growth and tackle disadvantage
Performance Indicators Comments/ Progress Status 2019/20 2020/212018/19Target To Date
-------- Last 3 Years ------------------- This Year -----------
Increased value of sales generated by
businesses as a direct result of Economic
Development intervention
The annual target was reduced from £10m to £5m in 2020-21 and
2021-22, in anticipation of a down turn in activity and investment by
businesses due to Covid-19. However, there are high projections of
turnover growth by those businesses who are now engaging with
economic development, and our partners, and seeking to invest in
business recovery and growth. The economy remains vulnerable though
in the short term, as the full impacts of the pandemic, Brexit, the war in
Ukraine and consequent disruption and uncertainty sustain risk levels.
Green £5.00m £22.11m £13.09m £11.91m ------
Maintain 3 year business survival rate The 3 year business survival rate figure comes from ONS sources, and
is not yet available for reporting this year. The most recently reported
data is for 2017-2020, when the 3 year business survival rate had fallen
slightly to 53.2%. In 2016-2019 the figure was 54.4% (1.2% decrease).
It is difficult to understand the reasons for this decline, as we are not
closely involved in measuring this data. There is a ‘churn’ in business
start up and failure, as this often encompasses self employment as a
consequence of redundancy, often followed by shut down to take up
new, secure employment. The new Business Gateway contractor,
Elevator, who have just completed their first year of delivery in
Lanarkshire, are specifically tasked with increasing business start ups
and also to increase the business survival rate. In addition, we have
refocused SLC business support grant funding towards improving these
areas of performance. Additional Economic Development resources
have been secured, with new officers focusing on key sectors, improved
marketing and promotion, developing business networks and
encouraging inward investment, which, it is hoped, will see these stats
improve over the next 3 years.
Report Later 62.00% ------ ------ ------ ------
Report on the number of carers supported
by dedicated Welfare Rights Officers and
amount of benefits awarded
In quarter 4, 289 new carers were supported by dedicated Welfare
Rights Officers in the Money Matters Advice Service, weekly benefits of
£17,162 were awarded, £193,853 of benefits were backdated, and
annual benefits amounted to £1,086,377.
From 1 April 2021 to 31 March 2022, 970 new carers were supported by
dedicated Welfare Rights Officers in the Money Matters Advice Service,
weekly benefits of £54,958 were awarded, £571,182 of benefits were
backdated, and annual benefits amounted to £3,428,998.
Green 400 970 1,057 1,080 546
Page 13
24

Page 25

Summary - number of measures complete, green, amber and red under each Council Plan
Priority / Theme
Council Priority/ Theme Complete Green Amber Red Report later Total
Promote sustainable and inclusive economic growth and
tackle disadvantage
4 8 3 0 0 15
Get it right for children and young people 5 2 1 0 0 8
Improve health, care and wellbeing 2 14 0 0 0 16
Ensure communities are safe, strong and sustainable 4 12 2 1 0 19
Delivering the plan and achieving best value 3 2 0 0 0 5
Total 18 38 6 1 0 63
Page 14
25

Page 26

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Ensure communities are safe, strong and sustainable
Action Measures Comments/ Progress Status
Improve access to
settled accommodation
for homeless
households
Implementation Rapid Rehousing Transition Plan - Year 3
(RP)
Year 3 Quarter 3 review complete and showing positive progress,
annual review process now underway.
Key measures to report are a further 25% reduction in long-term
homelessness, a 21% reduction in levels of homelessness from 969 in
2020/21 to 765 in 2021/22 and a 19% reduction in the length of time
homeless households spent in temporary accommodation from 223
days in 2020/21 to 181 days in 2021/22.
Green
Increase settled accommodation by converting 40 temporary
accommodation units to Scottish Secure Tenancies by March
2022 (RP)
21 units converted since April 2021 falling short of target of 40.
Post-covid priorities to maintain levels of temporary accommodation
supply have prevented meeting target. Further progression on
conversion of temporary tenancies to permanent will be prioritised in
year 4 of the Rapid Rehousing Transition Plan.
Red
Implement Housing First approach.  Provide suitable
accommodation and support for up to 40 individuals with
complex needs by 2023/24 (RP)
On target, with 33 cases implemented to date.  84% tenancy
sustainment record with 100% tenancies sustained in first 12 months
since April 2021.
Green
Page 15
26

Page 27

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Ensure communities are safe, strong and sustainable
Action Measures Comments/ Progress Status
Ensure effective
involvement with tenants
and other customer
groups
Customer Involvement Strategy with Annual review (including
programme of Customer Scrutiny) reported to Housing and
Technical Resources Committee
The third annual review of the Housing Services' Customer
Involvement Strategy was presented and approved at Housing and
Technical Resources Committee on 29 September 2021.
The review was completed jointly by officers within Housing and
Technical Resources and customer representatives within the Tenant
Participation Co-ordination Group, providing them with the opportunity
to monitor progress and define the priorities for the year ahead.
It identified good progress had been made in improving digital
connectivity and access to services for tenants and other customers.
Complete
Ensure continued
implementation of the
Local Housing Strategy
A Housing Needs and Demand Assessment, including an
assessment of the needs of Gypsy/Travellers, to be
completed by November 2021 (RP)
The Resource continues to play a significant contribution to the
development of the Glasgow City Region Housing Need and Demand
Assessment. This includes providing analysis and commentary on
different sections within the document, including specialist provision for
Gypsy/Travellers.
As part of the wider HNDA, development of a South Lanarkshire
Gypsy/Traveller accommodation needs assessment will also be
completed in partnership with housing, health and education services
to ensure the right numbers and types of accommodation options are
available. This is scheduled for completion within 2022.
Green
Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement
Site Investment Plans developed in consultation with
residents and planned improvement works completed by 31
March 2022 (RP)
Work continues to be progressed on both South Lanarkshire sites to
improve facilities and amenities available to residents. These works
are being taken forward in conjunction with site residents, who have
jointly developed site masterplans that highlight key projects they wish
to see take place. In addition a range of other projects are being taken
forward to ensure the sites continue to meet legislative compliance
and standards.
Projects delivered to date include new heating within the amenity
buildings, pitch extensions and a new community facility.
Green
Page 16
27

Page 28

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Ensure communities are safe, strong and sustainable
Action Measures Comments/ Progress Status
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP
and reported to Housing and Technical Resources
Committee (RP)
415 new build properties handed over to the council.  55 Open Market
Purchase properties acquired.
Green
Physical regeneration
work in priority areas
Deliver remaining 36 properties as part of Phase 1 of the
masterplan for regeneration at East Whitlawburn along with
Phase 2 (34 units) and Phase 3 (52 units)
112 properties within phase 1,2 and 3 delivered to date, with the
remaining 10 properties to be completed within 2022/23.
Green
Work with partners to bring 15 Long Term empty homes into
use during 2021/22 (RP)
11 brought back into use using a mixture of advice, assistance and
practical engagement.  Work in relation to empty homes will continue
to be expanded in 2022/23.
Amber
Ensure continued
implementation of the
Local Housing Strategy
Local Housing Strategy implemented with annual review
reported to the Executive Committee November 2021
Annual review completed and submitted to Executive Committee
November 2021.
Review highlighted good progress made against the indicators within
the Strategy including performance within new supply, homelessness
and energy efficiency. The final year (2021/22) review will be
completed as part of the development of the next strategy, scheduled
for submission to the Executive Committee in 2022.
Complete
Promote continued
growth and regeneration
through sustainable
economic and social
development within a
low carbon economy,
and guide decision
making on the location
of new development and
regeneration
Adopt Local Development Plan 2 The plan was formally adopted by the council on 9 April 2021. The six
week period for parties to seek a judicial review resulted in a challenge
relating to a site designation in East Kilbride. The council's response
has been considered and it has been concluded that the council will
not challenge this particular issue. Instead, Supporting Planning
Guidance has been prepared and was approved by Planning
Committee in March 2022. However, the adoption of the Plan remains
unaffected.
Complete
Page 17
28

Page 29

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Ensure communities are safe, strong and sustainable
Action Measures Comments/ Progress Status
Review and conclude
the council's
Sustainable
Development and
Climate Change
Strategy (2017-2022),
and develop the new
strategy (2022-2027)
Undertake a public consultation on the draft strategy and
Strategic Environmental Assessment by December 2021
A draft of the strategy and associated Strategic Environmental
Assessment was out for a six week public consultation throughout
February and March 2022, and the findings are being incorporated into
the final strategy.
Complete
Deliver and encourage
investment in our town
and neighbourhood
centres to maximise
opportunities for growth
and regeneration
Review and update existing town centre strategies to
establish the impact and outcomes of Covid-19
The consultative draft of the Blantyre Town Centre Strategy and Action
Plan was presented to Community and Enterprise Resources
committee in December 2021.
A consultant has been appointed to look at town centre visioning and
net zero, which will feed into the updates of individual town centre
strategies.
Green
Work with developers
and public and private
sector partners to
deliver the Community
Growth Areas City Deal
projects
Progress Community Growth Area sites in accordance with
criteria and programme specified in South Lanarkshire Local
Development Plan and City Deal
Newton, Ferniegair, Hamilton and Larkhall have had significant
completions and the main part of East Kilbride has now commenced.
On average, each CGA is building faster than anticipated which shows
that there is a demand for new build private housing across South
Lanarkshire. In addition the 'affordable' elements associated with the
CGAs continues to add to the social rented stock helping the council
meet its affordable housing need targets.
Green
Deliver effective
Employability Services
Modern Apprenticeships The council continue to champion MA's with 77 new starts this year
and supporting 96 from the previous year.
Green
Page 18
29

Page 30

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Ensure communities are safe, strong and sustainable
Action Measures Comments/ Progress Status
to support Economic
Recovery
No-One Left Behind Programmes, including Parental
Employability Support Programme and Gateway to
Employment.
No One Left behind suite of programmes  has supported 586  targeted
recruitment and subsidised employment for Homecare, Track and
Trace and wider support to SME's.
In addition we have supported parents and those with multiple barriers
to employment
Green
Kickstart Programme The council have delivered Kickstart as a direct employer and as a
Gateway Host. The council have directly recruited 43 young people
with 10 young people to date sustaining full time employment with the
council. The council have embraced this programme as a direct
employer and as key enabler of community planning. Adapting and
streamlining recruitment processes to ensure all young people have
access to opportunity. In addition we have supported 103 businesses
to recruit young people including 10 direct employment opportunities
with NHS
Green
Identify and manage
contaminated land
within the statutory
regulatory framework
Implement the Contaminated Land Strategy for South
Lanarkshire
Work continues on implementing the Contaminated Land Strategy.
The development control process delivery continued throughout
2021-2022 to consider sites affected by historical industrial legacy
contamination. Examples of this include Clyde Gateway
(Cambuslang/Rutherglen) regeneration, signify (Hamilton) factory site
re-development, as well as the former Motorola (East Kilbride) site
re-development.
Green
Agree and implement
vacant and derelict /
contaminated land
programme
Implement projects approved within the Vacant and Derelict
Land Fund framework for 2021-22
VDLF report was approved at Community and Enterprise Resources
Committee on 28 September 2021. A delay in the implementation of an
associated project (Clyde Gateway Cuningar Ph.2) has impacted the
delivery of 2021-22 funded VDLF projects.  These projects are being
progressed for implementation in 2022-23 on completion of the
Cuningar Ph.2 works in summer 2022.
Amber
Page 19
30

Page 31

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Get it right for children and young people
Action Measures Comments/ Progress Status
Implement National
Improvement
Framework priorities by
ensuring that every child
Complete the implementation of Phase 5 of the rollout of
additional hours for Early Learning and Childcare 1140 hours
nursery establishments
All 1140 hour places allocated to eligible children.
Delivery fully completed.  Over 7800 children and families accessing
provision.
Complete
achieves the highest
standards in literacy and
numeracy
Implement the action plan for full delivery of 1140 hours and
beyond in line with Scottish Government funding allocation
The implementation of Phase 5 of the rollout of additional hours for
Early Learning and Childcare 1140 hours, allocated to eligible children,
was completed with over 7800 children and families accessing
provision.
Complete
Support care
experienced young
people aged 16-24 to
develop their skills and
experiences to achieve
sustained positive
destinations
Implement a further roll out of the ‘care experienced
employability pilot’ to increase employment opportunities
across the council and with Community Planning Partnership
partners by June 2022
Following the approval of  a CMT paper in October 2021, which set out
a flexible  approach to support care experienced young people into
Modern Apprenticeships, the roll out of the ‘care experienced
employability pilot’ continued to support care experienced young
people aged 16-24 to develop their skills and experiences to achieve
sustained positive destinations with 5 young people supported to take
up Modern Apprenticeship posts with the Council.
Complete
Provide opportunities for
young people to
participate in vocational
and employability
learning opportunities in
the senior phase
Deliver Foundation Apprenticeship and Gradu8 programmes
in partnership with South Lanarkshire College, New College
Lanarkshire and Glasgow City College by June 2022
The Foundation Apprenticeship (FA) and GradU8 programmes have
continued to be delivered throughout academic year 2021/22. All
learning was delivered in person in college or FA hubs. The majority of
young people completed as planned by the spring break. For those yet
to complete due to covid disruption and other absences, a period of
remediation is planned during April 2022.
Green
Project Management of
Schools Projects and
General Services
Projects
General Services Programme spend will be achieved for the
financial year
Spend to Q4 £61.587m.  Annual target (Revised Estimated
Expenditure) £72.731m.  Outturns were impacted by the continued
issue of securing supplies and labour at the right time because of the
Pandemic, Brexit and War in Ukraine.
Amber
Support for Early Years Programme - Delivery of 8 new
nursery sites by the end of financial year 2021/22
Eight nurseries now complete. Complete
Page 20
31

Page 32

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Get it right for children and young people
Action Measures Comments/ Progress Status
Ensure effective delivery
of tackling poverty policy
and raise awareness of
the priorities contained
in the Local Child
Poverty Action Report
(LCPAR) across all
partner organisations
Produce and publish a refreshed Local Child Poverty Action
Report and summary (LCPAR) by August 2021
This action is complete. Strategy and Summary version completed,
published and distributed via children's services partners. Work
already being put in place for 2022-23 iteration.
Complete
Raise awareness of the
implications of the
Children’s Rights Bill
across the children’s
services workforce
Produce a Children’s Rights Handbook by June 2021 to
support staff develop children’s rights activity and increase
understanding of children’s rights
A recommendation to produce a children's rights handbook will be
reported to the Children's Services Strategy Group in June as part of
an overall report from the partnership United Nations Convention on
the Rights of the Child (UNCRC) scoping activity.
Green
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
Increase supply of
housing suitable for
older people
Additional amenity standard and wheelchair accessible
homes delivered as per SHIP and report to Housing and
Technical Resources Committee (RP)
83 Amenity/Wheelchair additional housing units were provided across
development sites within South Lanarkshire.
Green
Page 21
32

Page 33

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Sheltered housing support services monitored to ensure
compliance with Care Inspectorate standards.  Outcome of
inspections report to Housing and Technical Resources
Committee and improvement plans developed for any areas
of improvement
No inspections since 2017 however continue to self-asses against
Care Inspectorate framework, identify and progress improvement
actions.
We continue to invest in the refurbishment of common areas within
Sheltered Housing Complexes, with the completion of 4 Kirkton and
Fleming Court, Park Crescent, Castlefied gardens and Bank Terrace.
Green
Ensure monitoring,
compliance and control
of externally purchased
services
Produce annual report to Senior Management Team on the
quality of care provided by externally purchased services
Some issues evident within the Care Home sector, and local activity
with those homes and individuals placed within these homes.
Quality Assurance and Commissioning team review some legacy
arrangements with supported living providers.
Overview report of care inspectorate grades for external services
operating within South Lanarkshire will be presented to SMT June
2022.
Green
Ensure effective
contribution to health
and social care
outcomes contained
Scheduled reviews of the Strategic Commissioning Plan
(RP)
Housing and Technical Resources have actively contributed to the
development of the next South Lanarkshire Strategic Commissioning
Plan. This includes the inclusion of housing's specific contribution to
the outcomes of the plan.
Green
within the Strategic
Commissioning Plan
Progress reported as part of the Rapid Re-housing Transition
Plan Annual Report to Housing and Technical Resources
Committee in June 2021 (RP)
The second annual review of the South Lanarkshire Rapid Rehousing
Transition Plan was completed and presented to Housing and
Technical Resources in June 2021. The review identified that despite
the challenges of the Covid-19 pandemic, good progress had been
made across the different sections of the plan with significant
improvements in the proportion of tenancies allocated to homeless
households and the average time spent in temporary accommodation.
Complete
Page 22
33

Page 34

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
The Local Housing Strategy reported to Executive
Committee during November 2021 (RP)
Annual review completed and submitted to Executive Committee
November 2021.
Review highlighted good progress made against the indicators within
the Strategy including performance within new supply, homelessness
and energy efficiency. The final year (2021/22) review will be
completed as part of the development of the next strategy, scheduled
for submission to the Executive Committee in 2022.
Complete
Contribute to effective
joint working in
protecting children and
adults at risk of harm
Annual report on operation of Adult and Child Protection
procedures reported to Resource Management Team during
March 2022 (RP)
Annual report was delivered in April 2021. A service development
session was delivered in July 2021 for Housing Services and a further
development session for Property Services will be delivered April/May
2022.
Green
Improve outcomes for
people  to live in their
own homes and
communities for as long
as possible
Produce six monthly report to Senior Management Team on
inspection activity in quarter 2 and 4
A six monthly report on inspection activity is reported to the Senior
Management Team, Social Work Committee and South Lanarkshire
Integrated Joint Board.
Green
Contribute to effective
joint working in
protecting children and
Six monthly reporting to Chief Officer Group (COG) for
Homelessness and Gender Based Violence statistics (RP)
Quarterly statistical update provided. Meet with Gender Based
Violence Partnership Co-ordinator to discuss and agree a broader
update during 2022/23 covering prevention activity.
Green
Page 23
34

Page 35

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
adults at risk of harm Personal plan developed for all young people moved from
Care to living in their own home on a permanent basis
Good progress made rolling out new pathway plan with around 90% of
current young care leavers with housing applications also having a
completed housing pathway.
Green
Maintain affordable rents for council homes, benchmarked
against the Scottish average - a key action as detailed in the
Local Child Poverty Action Report (RP)
Through regular consultation and engagement with tenants, Housing
and Technical Resources has ensured that the average rent of £73.10
for 2020/21 continues to remain lower than the Scottish local authority
average of £78.10 per week for the same period.
In recognising the ongoing financial impact the Covid-19 pandemic is
having on many households, the 2022/23 rent increase for tenants
was 2.2%, held at the same level of increase as 2021/22. This
continues to allow investment in services and properties to be
delivered.
Progress against this measure is reported annually within the South
Lanarkshire Local Child Poverty Action Report.
Green
Page 24
35

Page 36

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
Prioritise allocation of available housing for those in need,
including homeless households - a key action as detailed in
the Local Child Poverty Action Report (RP)
In line with the Council's Housing Allocation Policy, housing continues
to be allocated to those most in need.
The council and its Registered Social Landlord partners delivered an
increase in the percentage of social rented properties directed to
homeless households in the year (53.4% of all council homes and 33%
of Registered Social Landlord homes) reducing time spent in
temporary accommodation and minimising the impact on households
with children.
Progress against this measure is reported annually within the South
Lanarkshire Local Child Poverty Action Report.
Green
Page 25
36

Page 37

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
Implement Government
Strategies relating to
mental health, additional
support needs, physical,
sensory and learning
disability
Provide annual reports to Senior Management Team and
Social Work Committee on progress of implementation of
national strategies
The Carers Strategy update was presented to SMT and SWC earlier in
the year, identifying additional resources to assist update all activity in
relation to the Carers  (Scotland ) Act 2026.  The HSCP Strategic
Commissioning Plan 2022/2025 has been presented to SWC.  Update
reports on the development of the National Care Service have also
been provided to SWC.  Community Justice Scotland are reviewing
the National Community Justice LOIP and reviewing their Outcome
Framework measures, our current CJLOIP has been extended for a
year until such times as activity can be aligned to national
developments. This activity has been reported to the Safer South
Lanarkshire Board, and the Community Justice partnership.
Green
Page 26
37

Page 38

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
Support the
implementation of the
IJB Directions which
focus on the shifting the
balance of care
Provide progress reports to the IJB in relation to the
Directions in quarter 2 and 4.
In light of preparatory which was undertaken for the new Strategic
Commissioning Plan 2022 – 2025 a review of the strategic directions
was undertaken to ascertain if they still remained relevant to the
delivery of the IJBs vision for health and social care services was
undertaken and presented the IJB at its meeting on 25th January
2022.
The Strategic Commissioning Plan 2019-22 outlined 13 strategic
priorities and 43 commissioning intentions upon which 37 Directions
were aligned to. To summarise he status of the directions:
-On hold. Not possible to progress during this period 2 (5%)
-Progressing but a change in outcomes and/or delay expected 27
(73%)
-Progressing as originally planned 1 (3%)
-Direction completed 7 (19%)
The IJB agreed the removal of 8 Directions as they had been
completed with those remaining being current.  Some have been
amalgamated or changed to reflect current arrangements.
There are 27 Directions in all and represents and overall reduction of
10 Directions when compared with prior reports.
Green
Develop a sustainable
food system to
overcome social, health,
economic and
environmental issues
related to food
Implement year two of the Good Food Strategy (2020-2025)
Action Plan and monitor its impacts, particularly in relation to
food insecurity and poverty as a result of Covid-19
The second-year action plan of the Good Food Strategy has been
implemented. Detailed information on the implementation of each of
the actions will be available in the quarter four food action plan
progress reports that will be presented to the Climate Change and
Sustainability Committee. The report will include actions and progress
in relation to food poverty.
Green
Page 27
38

Page 39

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Improve health, care and wellbeing
Action Measures Comments/ Progress Status
Extend the range and
choice of day
opportunities for older
people
Consult on the review of day care services for older people Challenges faced by services during the Omicron variant period held
up progress on returning for a third stage of consultation in respect of
the Day Service Review.  This was though completed during February
and March 2022.  The main focus of this stage of consultation
concerned a future model of transport and a reduction in the day
service estate which would be necessary in order to invest in a service
model that is capable of offering choice and control in line with the
principles of SDS.
Green
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Provide road and
infrastructure
improvements to
support new
developments including
those undertaken as
part of the City Deal
Progress/deliver prioritised road infrastructure improvements
in line with available external and internal capital funding for
2021-22
A traffic signal control system called MOVA, which involved the
upgrade/replacement of traffic signal equipment at the junction with
East Kilbride Road / Blairbeth Road, Rutherglen has been completed.
A traffic modelling exercise was also completed for the town of Lanark
in Spring 2021.  This has been reviewed and a consultation exercise
has recently concluded.  Responses are currently being reviewed.
Green
Complete Greenhills Road major transport infrastructure
project
Current programme has a planned completion date of the end of April
2022. Although some finishing works will continue into May.  Additional
Covid-19 and material shortage related costs and other cost increases
were identified and a package of measures to manage these has been
developed. Material and resource pressures are continuing to affect
programme.
Amber
Page 28
39

Page 40

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Development of the outline business case for the
Stewartfield Way Sustainable Transport Capacity
Enhancement Project and associated supporting technical
assessments / designs
The Strategic Business Case has been finalised and was considered /
approved by Executive Committee on 10 March 2021.  It was also
considered and approved by Programme Management Office, Chief
Executive Group and Cabinet in May / June 2021.  The financial profile
was reviewed and adjusted to reflect the revised programme.  Work on
the outline business case has been refocused and the next steps are
ongoing, including a potential Member's awareness session in Spring
2022.
Green
Page 29
40

Page 41

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Enable greater use of
public transport by
working with partners to
improve public transport
infrastructure
Progress/deliver prioritised improvements to bus and rail
infrastructure (e.g. park and ride) in line with agreed Park
and Ride Strategy (2018-27) and available external funding
for 2021-22
A number of Park and Ride projects have been taken forward as
outlined below: -
1. Lanark Interchange Project – Following planning consent being
awarded, works have recently been completed for new park and ride
provision of approximately 30 new spaces.
2. Cambuslang Park and Ride – Works were completed in summer
2021 and the Park and Ride is open.
3. East Kilbride Rail Enhancement Project – The council is in
partnership with Transport Scotland, Network Rail, SPT and Sustrans
to take forward park and ride, bus interchange, pedestrian/cycle route
access enhancements.  Ongoing detailed design discussions are
regularly taking place with a programme of works currently being
considered following revisions to the rail network provision parts of the
project.
Bus infrastructure works are complete, with a new bus turning circle
constructed in Belstane Gate, Carluke.  Bus stop and shelter works at
various locations have also been completed with four shelters in
Rutherglen recently replaced.
Complete
Page 30
41

Page 42

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Encourage active travel
by extending our
network of cycle routes
Progress/deliver walking and cycling projects/schemes in line
with agreed 2021-22 capital programme
A number of cycling and walking projects are progressing and these
are listed below: -
1) Active Travel Studies – The three studies for Bothwell, Uddingston
and Blantyre Area / Strathaven, Stonehouse and surrounding villages/
and Larkhall, have been completed and posted on the council’s
website.
2) East Kilbride Cycle Network - This project on West Mains Road is
split into phases to reflect current and anticipated future funding
availability, as well as connecting into the East Kilbride Rail Corridor
Enhancement project being taken forward by Network Rail.
Construction of a section on West Mains Road between the rail station
and a point to the east of Kirktonholm Road is complete. Consultation
on a future phase on Churchill Avenue is complete, and the feedback
is currently being reviewed.
3) Bothwell/Uddingston Cycle Network (NCN74 Raith to NCN75
Uddingston – Consultation on options was undertaken in January
2022.  A section of footpath widening between Bellshill Road and North
British Road has been completed.
4) Carstairs Junction to Carluke – Construction works which include
buildouts, speed limit reduction and other associated works were
recently completed.
5) Cycle Parking Provision in Town Centres – Locations for new
shelters have been identified and works were recently completed.
6) Cycle Shelters and parking stands in schools – Locations for new
shelters have been identified and funding successfully awarded.
Shelter works were recently completed.
7) Cycle Route designs currently being taken forward in various
locations: Larkhall to Blackwood / Carluke and Law / Hamilton / Lanark
Complete
Page 31
42

Page 43

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
/ Cambuslang and Newton.
8) Car Free Zones at Schools - 2 schools (Burnside Primary School
and St Joseph’s Primary School) will have zones in place in April 2022.
Establish a framework
for action to support the
recovery and renew the
South Lanarkshire
economy
Develop an Economic 'Response, Recovery and Renewal'
Strategy framed around three themes: People, Place and
Business, for Committee approval by June 2021
Development of the new Economic Strategy has shifted focus during
the year towards a more progressive forward thinking strategy, which
sets out clear ambitions over the next five years (2022-27).
The draft strategy is now due to be presented to Full Council at the
end of June 2022 as part of a suite of documents accompanying the
new Council and Community Plans.
The proposed vision is “to make South Lanarkshire a flourishing,
green, dynamic and equitable place for communities, visitors,
businesses and investors”, and the strategy continues to be framed
around the three themes of sustainable, inclusive economic
development – People, Place and Business.
Amber
Support Glasgow City
Region City Deal
development
programmes
Prepare Business Case approvals for roads and Community
Growth Area projects to be approved by City Deal Cabinet
East Kilbride Community Growth Area - Jackton Primary School Full
Business Case submitted in December 2021, and approved at
Executive Committee on 2 February 2022, City Deal Chief Executive's
Group (CEG) meeting on 3 February 2022, and City Deal Cabinet on
15 February.  Contractor has commenced works on site.
Green
Develop a Community
Wealth Building (CWB)
strategy for South
Lanarkshire
Develop a CWB strategy for South Lanarkshire and seek
approval from Elected Members by May 2021.
A Community Wealth Building strategy was approved by Executive
Committee on 10 March 2021.
Complete
Page 32
43

Page 44

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate,
Deliver programmes, services, and events to businesses
around sectors, location, and themes (e.g., food and drink,
tourism, construction, low carbon, innovation,
internationalisation, collaboration, and young enterprise)
A number of events have been supported, including Lanarkshire
Larder- food and drink network and promotion, Meet the real Buyer
event and associated procurement training, Tourism Symposium, Build
Lanarkshire construction sector support and participation in several
external-led networking groups promoting SLC and partner business
support services.
Green
whilst creating the right
conditions for low
carbon economic growth
Manage the Supplier Development Programme to deliver
events, training and e-commerce support to SME's or third
sector organisations who are interested in working with the
public sector
The Supplier Development Programme (SDP) continues to thrive
under the leadership of the SDP Manager and a capable SDP Board
of Directors; delivering training and events support nationally on behalf
of member authorities, Scottish Government and other partners. The
programme will benefit from increasing participation of NHS, after
several years of encouraging their membership. Additional short term
resources have been brought on board to sustain service levels while
a strategic review progresses.
Green
Community Safety
priorities including
relevant parts of the
SLCP are achieved
Progress against Community Safety priorities to the Safer
South Lanarkshire Board on June 2021 and November 2021
Progress updates provided to Safer South Lanarkshire Board as
planned.
Complete
Page 33
44

Page 45

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Understand the financial
security of our
customers
Key indicators reported to the Scottish Housing Regulator as
part of annual return on the charter submitted during May
2021 (RP)
Following submission to the regulator in May 2021, detailed analysis
and monitoring of key indicators related to the financial position facing
our customers continues to be progressed.
Following publication of data by the Scottish Housing Regulator and
voluntary benchmarking groups of which the Council are members,
results have been analysed to understand our position, relative to
other Local Authority landlords.  The Council continues to be the 7th
lowest in terms of average rent levels and affordability.
Green
Contributions to the Welfare Reform Group led by Finance
and Corporate Resources (RP)
The Resource continues to contribute to the corporate response to
welfare reform.  A 2020/21 update from Housing Services was
included in the report to Corporate Management Team (CMT) in June
2021, and also reported to the Community Planning Partnership Board
(CPPB) on 15 September 2021.
A further Housing Services update covering the first 6 months of
2021/22 was provided and presented to CMT in December 2021 and
to the CPPB on 9 March 2022.
Green
Page 34
45

Page 46

IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System   Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Promote sustainable and inclusive economic growth and tackle disadvantage
Action Measures Comments/ Progress Status
Key actions detailed in the Local Child Poverty Action Report
(RP)
The third annual South Lanarkshire report has now been developed
and similar to the previous Local Child Poverty Action Report (LCPAR),
it contains measures and actions which are structured around three
drivers of child poverty: income from employment; costs of living;
income from social security and benefits in kind.
Within the LCPAR the measures and actions relating to Housing and
Technical Resources are predominately set out within the chapter on
‘cost of living ’. They focus around the key areas below, for which
housing makes a clear contribution towards preventing and reducing
child poverty:
• Reducing the costs of housing for families including energy costs;
• Investment to increase new affordable housing supply;
• Preventing and reducing homelessness for households, including
families with children and young people
Green
Improve energy
efficiency stock to help
address fuel poverty
Deliver energy efficiency planned capital investment by 31
March 2022
Delivery of programme was impacted by the continued affect of
Covid-19 and affected the ability to drawdown funding prior to June
2022, therefore, some projects have carried forward into 2022/23
programme.
Amber
Page 35
46

Page 47

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Tuesday 2 August 2022
Council Plan actions and measures
Delivering the plan and achieving best value
Action Measures Comments/ Progress Status
Lead on the renewal of
strategic planning and
work to further align the
Council Plan with the
Community Plan
Prepare a draft Council Plan and Community Plan for formal
consultation by December 2021
An Elected Member's information session was held on 10 June 2021
to discuss the process and approach to the review of the Council Plan
and the Community Plan. A further Elected Member session on 31
January 2022 updated Members on progress. The plans were
approved by the Council on 15 June 2022.
Green
Take forward IT strategic
developments
Implement approved actions from Year 2 of the SLC Digital
Inclusion Strategy to support most deprived citizens to
access benefits of being online
Digital inclusion subgroup have delivered a range of projects and
initiatives to improve digital inclusion across communities in South
Lanarkshire.
Complete
Develop and deliver training plan to upskill IT staff in new
technologies
Training and development activities achieved to meet the needs of IT
Services and the wider Council.
Complete
Implement effective Best
Value management
arrangements to ensure
continuous improvement
and efficient and
effective service delivery
Submit all Scottish Government Performance Annual
Reports within timescale
All statutory returns due were submitted to the Scottish Government
within agreed timescales this year.
Complete
Page 36
47

Page 48

48

Page 49

Appendix 2
Connect Quarter 2 to Quarter 4 2020-21 scrutiny of change in measure status 
Measure Q2
Status
Q4
Status
Q4 Comments
Performance has declined from Q2 to Q4 
Land Audit Management System
grounds maintenance score
Green  Amber LAMS measures the quality of grounds
maintenance based on surveys which are
completed throughout the year. Taking all of
this year's scores into consideration (72, 72, 74
and 67), the overall LAMS score for 2021-22 is
71.3, which is slightly below the target of 72.
Percentage of total household
waste that is recycled
Amber  Red Measure is reported per calendar year. The
figure for quarter four (October to December
2021) was 37.21%. This equates to 41.5% for
2021, which is higher than the 2020 figure
(40.5%), but remains below the target figure of
50%. Higher residual waste tonnages collected
at the kerbside due to Covid-19 and home-
working, high residual waste content in bulk
uplifts (black bag waste accepted), and more
non-recyclable waste being disposed of in
Household Waste Recycling Centres, are all
factors that need to be taken into account when
understanding the household waste recycling
performance.
Increase settled accommodation
by converting 40 temporary
accommodation units to Scottish
Secure Tenancies by March 2022
Green Red Twenty one units converted since April 2021
falling short of target of 40. East Kilbride have
flipped 9, Hamilton 4, Rutherglen and
Cambuslang 5 and Clydesdale 3
Work with partners to bring 15
Long Term empty homes into use
during 2021/22 (RP
Green Amber Eleven brought back into use using a mixture
of advice, assistance and practical
engagement including - directing to merchant
discounts, work with Council Tax etc
Implement projects approved
within the Vacant and Derelict
Land Fund (VDLF) framework for
2021-22
Green Amber VDLF report was approved at Community and
Enterprise Resources Committee on 28
September 2021. A delay in the
implementation of an associated project (Clyde
Gateway Cuningar Ph.2) has impacted the
delivery of 2021-22 funded VDLF projects.
These projects are being progressed for
implementation in 2022-23 on completion of
the Cuningar Ph.2 works in summer
Reduce the gap for positive
destination outcomes for those
pupils in the most deprived 20%
data zone
Report
later
Amber The data must be viewed in the context of the
ongoing Covid-19 pandemic and its impact on
the initial destinations available to school
leavers.
Complete Greenhills Road major
transport infrastructure project
Green Amber Current programme has a planned completion
date of the end of April 2022. Although some
finishing works will continue into May.
Additional Covid-19 and material shortage
related costs and other cost increases were
identified and a package of measures to
manage these has been developed. Material
and resource pressures are continuing to affect
programme.
% of lets to Urgent housing (UH)
need households
Green Amber Although performance is slightly below target,
there has been an increase in the number of
lets to urgent need from 1,089 in 2020-21 to
1,225 in 2021-22 
2
49

Page 50

Measure Q2
Status
Q4
Status
Q4 Comments
General Services Programme
spend will be achieved for the
financial year
Green Amber Spend at the year-end (£62m) was below the
target (£73m). Outturns were impacted by the
continued issue of securing supplies and
labour at the right time because of the
Pandemic, Brexit and the war in Ukraine 
Performance has improved/completed from Q2 to Q4 
Customer Involvement Strategy
with Annual review (including
programme of Customer Scrutiny)
reported to Housing and Technical
Resources Committee
Green Blue The third annual review of the Housing
Services' Customer Involvement Strategy was
presented and approved at Housing and
Technical Resources Committee on 29
September 2021. The review was completed
jointly by officers within Housing and Technical
Resources and customer representatives
within the Tenant Participation Co-ordination
Group, providing them with the opportunity to
monitor progress and define the priorities for
the year ahead. The review identified good
progress had been made in improving digital
connectivity and access to services for tenants
and other customers.
Local Housing Strategy
implemented with annual review
reported to the Executive
Committee November 202
Green Blue Annual review completed and submitted to
Executive Committee for noting on schedule.
Review highlighted good progress made
against the indicators within the Strategy
including performance within new supply,
homelessness and energy efficiency. The final
year (2021-22) review will be completed as part
of the development of the next strategy,
scheduled for submission to the Executive
Committee
Adopt Local Development Plan 2 Green Blue The plan was formally adopted by the council
on 9 April 2021. The six week period for parties
to seek a judicial review resulted in a challenge
relating to a site designation in East Kilbride.
The council's response has been considered
and it has been concluded that the council will
not challenge this particular issue. Instead,
Supporting Planning Guidance has been
prepared and was approved by Planning
Committee in March 2022. However, the
adoption of the Plan remains unaffected.
Undertake a public consultation on
the draft SDCCS (Sustainable Dev
and Climate Change Strategy) and
Strategic Environmental
Assessment by December 2021
Report
later
Blue A draft of the strategy and associated Strategic
Environmental Assessment was out for a six
week public consultation throughout February
and March 2022, and the findings are being
incorporated into the final strategy.
Percentage of pupils entering
positive destinations
Report
later
Green The percentage of pupils entering positive
destinations in South Lanarkshire increased
from the previous year and is above the target
set.
Number of lunches served in
nursery schools as part of new
Scottish Government Early Years
Initiative
Context Green 132,475 lunches were served during financial
periods 10, 11 and 12. This brings the year to
date figure to 438,249. Target has been
exceeded. 
50

Page 51

Measure Q2
Status
Q4
Status
Q4 Comments
Implement a further roll out of the
‘care experienced employability
pilot’ to increase employment
opportunities across the council
and with Community Planning
Partnership partners by June 2022
Green Blue We set out a flexible approach to support care
experienced young people into Modern
Apprenticeships and the roll out of the ‘care
experienced employability pilot’ continued to
support care experienced young people aged
16-24 to develop their skills and experiences to
achieve sustained positive destinations with 5
young people supported to take up Modern
Apprenticeship posts with the Council
Produce and publish a refreshed
Local Child Poverty Action Report
and summary (LCPAR) by August
2021
Green Blue This action is complete. Strategy and Summary
version completed, published and distributed
via children's services partners. Work already
being put in place for 2022-23
% of new build that meets needs
of older people 
Report
later
Green Target exceeded due to acceptance of 24
amenity units at Hareton Place East Kilbride.
Produce annual report to Senior
Management Team on the quality
of care provided by externally
purchased services
Report
later
Green Some issues evident within the Care Home
sector, and local activity with those homes and
individuals placed within these homes. Quality
Assurance and Commissioning team review
some legacy arrangements with supported
living providers. Overview report of care
inspectorate grades for external services
operating within South Lanarkshire will be
presented to SMT June 2022
Progress reported as part of the
Rapid Re-housing Transition Plan
Annual Report to Housing and
Technical Resources Committee
in June 2021 (RP)
Green Blue The second annual review of the South
Lanarkshire Rapid Rehousing Transition Plan
was completed and presented to Housing and
Technical Resources in June 2021. The review
identified that despite the challenges of the
Covid-19 pandemic, good progress had been
made across the different sections of the plan
with significant improvements in the proportion
of tenancies allocated to homeless households
and the average time spent in temporary
accommodation.
The Local Housing Strategy
reported to Executive Committee
during November 2021 (
Green Blue Annual review completed and submitted to
Executive Committee for noting on schedule.
Review highlighted good progress made
against the indicators within the Strategy
including performance within new supply,
homelessness and energy efficiency. The final
year (2021/22) review will be completed as part
of the development of the next strategy,
scheduled for submission to the Executive
Committee in 2022
Provide annual reports to Senior
Management Team and Social
Work Committee on progress of
implementation of national
strategies
Report
later
Green The Carers Strategy update was presented to
SMT and SWC earlier in the year, identifying
additional resources to assist update all activity
in relation to the Carers (Scotland ) Act 2026.
The HSCP Strategic Commissioning Plan
2022-25 has been presented to SWC. Update
reports on the development of the National
Care Service have also been provided to SWC.
Community Justice Scotland are reviewing the
National Community Justice LOIP and
reviewing their Outcome Framework measures,
our current CJLOIP has been extended for a
year until such times as activity can be aligned
to national developments. This activity has
been reported to the Safer South Lanarkshire
Board, and the Community Justice partnership 
51

Page 52

Measure Q2
Status
Q4
Status
Q4 Comments
Percentage of our road network
that should be considered for
maintenance treatment (Road
Condition Index)
Report
later
Green The Road Condition Index (RCI) results from
the SCOTS (Society of Chief Officers of
Transportation in Scotland) survey for the
period covering 2019 to 2021 (published in
January 2022), indicate that 29.7% of our road
network should be considered for treatment,
compared to our previous figure of 30.6%. This
is a further improvement, and our RCI figure for
the network condition is 4.5% better than the
Scottish average (34.2%). This places South
Lanarkshire in 10th position for the 32 local
roads authorities.
Progress against Community
Safety priorities to the Safer South
Lanarkshire Board on June 2021
and November 2021
Green Blue Progress provided to Safer South Lanarkshire
Board as planned
Implement approved actions from
Year 2 of the SLC Digital Inclusion
Strategy to support most deprived
citizens to access benefits of being
online
Report
later
Blue Digital inclusion subgroup have delivered a
range of projects and initiatives to improve
digital inclusion across communities in South
Lanarkshire.
Develop and deliver training plan
to upskill IT staff in new
technologies
Green Blue Training and development activities achieved
to meet the needs of IT Services and the wider
Council.
Submit all Scottish Government
Performance Annual Reports
within timescale
Green Blue All statutory returns due were submitted to the
Scottish Government within agreed timescales
this year. 
52

Page 53

Report
Agenda Item 
To: Performance and Review Scrutiny Forum
Date: 16 August 2022
Prepared by: Executive Director (Finance and Corporate Resources) 
Subject: Local Government Benchmarking Framework
2020/2021 Results and Action Plan
1. Purpose of Report 
1.1. The purpose of this report is to:- 
 Provide the Forum with the Local Government Benchmarking Framework
(LGBF) results for 2020/2021;
 provide the Forum with explanatory narrative for the suite of indicators, including
the proposed actions, where appropriate, being taken to address those LGBF
indicators where the results are declining and/or are below the Scottish average;
and
 provide a family group analysis of those LGBF indicators where South
Lanarkshire Council’s result is below the Scottish average. 
2. Recommendations
2.1. Forum is asked to note the following recommendations:- 
(1) that the importance of viewing LGBF measures in the local context, as
detailed in the limitations and cautions section below (see 4.1- 4.4), be
noted; 
(2) that the results, narrative, actions and family group analysis included,
following the scrutiny of the 2020/2021 results, be noted; 
(3) that the arrangements for the publication of South Lanarkshire’s results, per
the statutory requirements, be noted; and
(4) that the developments and events being undertaken by the Improvement
Service/LGBF Board, be noted.
3. Background
3.1. The core purpose of the Local Government Benchmarking Framework (LGBF) is to
make comparisons on spend/cost, performance and customer satisfaction results
over several years and also between similar councils. It comprises a suite of
performance indicators, collated under the following service headings:- 
 Children’s Services
 Corporate Services (ie, support services)
 Adult Social Care
 Culture and Leisure Services
 Environmental Services
 Housing Services
 Corporate Assets 
3
53

Page 54

 Economic Development 
 Climate Change 
 Financial Sustainability 
3.2. These headings represent approximately 70% of local authority spend. 
3.3. Publication of the LGBF results is a statutory requirement set out by the Accounts
Commission in the Direction to local authorities as required by the Local
Government Act 1992. It is seen as a key part of councils’ commitment to Best
Value, public performance reporting (PPR) and continuous improvement. 
3.4. This report presents the 2020/2021 LGBF results (on a Resource by Resource
basis) and sets out commentary and improvement actions against those indicators.
Of particular interest, in terms of continuous improvement, are those indicators
which are declining and/or falling below the Scottish average.  The steps and
actions identified in the report will not necessarily show immediate improvements,
many are long term plans. 
3.5. Despite the easing of social distancing and other restrictions, the Council continues
to face financial and other impacts resulting from Covid. At times during the
pandemic a number of services had to be suspended or reduced due to
government advice and the Council was also obliged to redirect resources so that it
could deliver vital new services and supports for individuals, communities and
businesses. There was an inevitable impact on performance in some areas, with
some effects ongoing. 
4. Interpreting the LGBF Results: Limitations and Cautions
4.1. Although the LGBF results are available for all councils in Scotland and therefore
can be used to construct council league tables, the Improvement Service cautions
against this approach, emphasising that the purpose of the data is to act as a “can-
opener” for discussions about performance and improvement in the context of
specific services, taking into account geography, demographics and local council
priorities. 
4.2. Within this report, South Lanarkshire’s performance trend for the past 3 years is
provided, together with the most recent year’s performance relative to the Scottish
average.  As with the LGBF as a whole, these summary figures are intended to
frame a closer examination of the underlying data and context for specific
indicators. For this reason, it is necessary to pay close attention to the narrative
against each indicator (provided in Appendix 1) when forming a judgement about
what the performance means in a South Lanarkshire context. 
4.3. All statistics require, for correct interpretation, a knowledge of potential limitations. 
In particular, the following specific points should be borne in mind when reviewing
the LGBF results:- 
 Local policy decisions can impact on the LGBF results and interpretation of the
data.  This is particularly true for cost indicators in the LGBF suite, where lower
costs are generally equated with good performance.  In these instances, where
the Council has opted to invest resources (for example in roads maintenance or
in the school estate), costs will appear higher than the Scottish average or for
comparable councils and performance may be assessed as ‘worse’. 
54

Page 55

 A number of satisfaction measures within the LGBF are derived from the
Scottish Household Survey (SHS).  There are important limitations to this data
which the Council has highlighted for several years now.  First, the number
sampled is very small relative to the population.  In 2019, interviews were
carried out with 423 adults in South Lanarkshire, equating to less than 0.2% of
the adult population. Second, survey respondents are asked how satisfied they
are with services even if they have not used the service in question.  Third, for
these indicators, the Council conducts its own surveys of service users so that it
can closely monitor and respond to user experiences.  These surveys, of people
who have used the services, invariably rate the services more highly than the
SHS. 
 The figures within the LGBF are the result of a wide range of service provision
models and data collection processes carried out in each of Scotland’s 32
councils.  While the LGBF endeavours to achieve high standards of
completeness and consistency, there are inevitably differences between
councils and between indicators in terms of what is counted and how it
translates into LGBF performance. 
4.4. These points are not intended to undermine the LGBF results.  Rather they serve to
emphasise the importance of looking individually at each service and each indicator
to understand the local drivers and determinants of performance. 
4.5. The Improvement Service (IS) hosted its annual Learning event on 22 January
2022. The Improvement Service analyses the LGBF results and using information
and intelligence gathered from benchmarking performance officers from across
Scotland, identifies the key national expenditure and performance trends to
populate its National Overview Report which is published at the same time as the
actual results. Key general points emerging from this analysis include:- 
 The pre-Covid improvements are slowing down. This is likely to continue as the
long term impact from continued financial pressures is beginning to show in the
results.
 It is estimated that in real terms, the local government gap between actual and
required spend is £1.8 billion or 15% leading to increasing reliance on
savings/reserves/charges and income generation by councils.
 Coupled with ring-fencing in service areas like social care, education and looked
after children, this creates growing pressure on other services, for example,
culture and leisure, roads, environmental services, etc 
Note that SLC specific analysis and narrative is included in the
‘comments/progress’ column in Appendix 1. 
5. Results and Key Messages
5.1. The report attached as Appendix 1 summarises the recent results for South
Lanarkshire Council, indicating whether performance in 2020/2021 has improved
(↑) or declined (↓) compared with 2019/2020 results and if performance is better
() or worse (X) than the Scottish average in 2020/2021. It also includes
explanatory narrative for the movements in performance between 2019/2020 and
2020/2021. 
5.2. The table below summarises South Lanarkshire Council’s performance, which
should be considered in the context of the impact of responding to Covid 19.   
55

Page 56

Table 1 – Summary of performance of LGBF Results 
KEY:
Number (%) of indicators
2018-19 2019-20* 2020-21**
South Lanarkshire performance   
↑ improving performance in SLC 34 (38%) 35 (39%) 36 (38%)
↓ declining performance in SLC 34 (38%) 45 (49%) 36 (38%)
↔ No change in performance in SLC 3 (3%) 1 (1%) 2 (2%)
--- Results/trends not available  18 (21%) 10 (11%) 21 (22%)
Comparison with Scottish average   
✓ SLC results better than Scottish average 44 (49%) 42 (46%) 37 (39%)
X SLC results worse than Scottish average 28 (32%) 39 (43%) 37 (39%)
↔ SLC results same as Scottish average 3 (3%) 0 (0%) 0 (0%)
-- Results not available  14 (16%) 10 (11%) 21 (22%)  
* Results at May 2021 refresh 
** Results at May 2022 refresh 
5.3. Across the 95 indicators in the 2020/2021 suite, South Lanarkshire Council’s
performance improved against 36 (38%) indicators, remained the same against 2
(2%) indicators and declined for 36 (38%) indicators. There are 21 (22%) indicators
for which the results or trend information is not yet available for 2020/2021. 
5.4. In terms of South Lanarkshire’s figures relative to the Scottish results, performance
was better than the Scottish average for 37 (39%) indicators and was worse than
the average for 37 (39%) indicators. There are 21 (22%) indicators for which the
2020/2021 results are not yet available. 
5.5. Following an Audit Scotland recommendation, the Forum (at its meeting on 26
November 2019) agreed to introduce a family group analysis in the annual reporting
of the Council’s LGBF results.  The family group analysis focuses on those
indicators where the Council is performing worse than the Scottish average. Based
on the 2020/2021 results, this relates to 37 (39%) indicators. This analysis is
attached at Appendix 2. 
6. Publication of the Data
6.1. The Improvement Service, along with the LGBF Board, the Directors of Finance sub
group, Scottish Government and other organisations, has been working to tighten
up the information gathering process. To this end, the 2020/2021 data released
initially in February 2022 and refreshed in May 2022 is considered final. In line with
previous years, the Improvement Service has uploaded the latest data to the online
LGBF visualisation tool which enables anyone, including members of the public, to
explore the results for themselves - mylocalcouncil. 
6.2. Aside from this, at a local level, each council is required to publish its own results.
As in previous years, the LGBF results information for South Lanarkshire Council is
uploaded on to the Council’s website, together with contextual information and
explaining the indicators. 
6.3. To coincide with the official release of the latest data in February 2022, a national
overview report was published by the Improvement Service, which looks at trends
and results across Scotland as a whole. 
56

Page 57

6.4. The impact of Covid has affected data collection for some indicators, notably in
education and the satisfaction data.  These are noted below for information:- 
 Education 
CHN 13a, CHN 13b, CHN14a and CHN14b – Broad General Education (BGE)
Numeracy/Literacy: data from Teacher Judgements was not collected this year
due to Covid, therefore these indicators will not be included in this year’s
publication. CHN19b and CHN20b school attendance and exclusion rates for
looked after children are not available.
 Satisfaction Data  
Some comparability issues need to be resolved before satisfaction data will be
available for inclusion at local authority level 
7. Next Steps 
7.1. The actions identified in the comments column in Appendix 1 will be taken forward.   
7.2. As noted at 6.1 above, these results are to be considered final, however, a further
refresh of the data may be released following completion of the final Scottish
Government validation process on the financial data or to allow inclusion of any, as
yet unavailable results. Updates will be made to the performance data and narrative
uploaded onto the Council’s website, as appropriate. 
7.3. Forum is asked to note that the Improvement Service continues to review and
develop the suite of indicators. For example:- 
 Children’s Services: 
CHN24 was introduced in 2020-21 and measures the percentage of children
living in poverty (after housing costs), however, data is not currently available
and will be updated in the 2021-22 LGBF framework
 Economic Development  
New measures introduced;
Econ11 Gross value added (GVA) per capital (data is not currently available and
will be updated in the 2021-22 LGBF framework)
Econ12a - Claimant Count as % of Working Age Population  
Econ12b - Claimant Count as % of 16-24 Population 
7.4. The Improvement Service organises annual benchmarking events, in which
colleagues from specific services representing all local authorities are invited to
attend, to come together to learn and share good practice for their particular area of
operation. The Improvement Service aligns these events with existing
networks/forum wherever possible, minimising duplication of discussions and
bringing together relevant expertise. During the Covid crisis in 2020, these events
did not taken place but were reintroduced in an online format during 2021.  The
Council will continue to support these events. 
7.5. Forum will be aware of engagement with the Improvement Service to develop our
approach to using, analysing and reporting the LGBF results going forwards.  In
December 2021, the IS provided an initial “bespoke analysis” of indicators from the
LGBF and the Community Planning Outcomes Profile, aligned with the emerging
themes from engagement on the new Council Plan and Community Plan.  This
analysis was the basis of engagement with Resources and an update report with
recommendations will be brought to Forum later in the year.
8. Employee Implications
8.1. There are no employee implications.
57

Page 58

9. Financial Implications
9.1. There are no direct financial implications arising from this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no climate change, sustainability or environmental implications as a
result of this report. 
11. Other Implications
11.1. There are no risk or other implications associated with the content of this report. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
12.2. Consultation has taken place with Resources in gathering the information and
explanations included within this report and appendices. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
27 June 2022 
Link(s) to Council Values
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
• LGBF results 2020-21 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tom Little, Head of Communications and Strategy
Extension: 845 4904 (Tel: 01698 454904)
Email: tom.little@southlanarkshire.gov.uk 
58

Page 59

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Children's Services CHN 1 Cost per primary school
pupil
£5,513.00 £5,709.00 £5,810.00 £5,897.00 Our cost per primary school pupil has risen in
2020-21 however is slightly below the Scotland
average and below the family group median.
There has been increased expenditure within
the primary sector on staff costs as a result of
the national pay settlement; additional support
for council investment in teachers and
classroom support; full year costs of the
Education priorities including investment in
Breakfast clubs as well as additional
expenditure in relation to COVID including
staffing, cleaning and PPE.  There has been a
significant reduction in the rates associated
with primary schools during 2020/21 as well as
some costs for pre primary teachers removed
to pre primary sector.  Whilst the overall cost
per pupil is increasing, these latter two areas
account for an increase below the national
average.
However, these cost results give no indication
of the quality of education delivered.  SLC's
results are linked directly to our position in
ensuring our level of spending on education is
supporting the delivery of high quality learning
experience and environments for all South
Lanarkshire’s pupils at all levels of their
education.
CHN 2 Cost per secondary
school pupil
£6,879.00 £7,184.00 £7,345.00 £7,629.00 The cost per secondary school pupil in South
Lanarkshire has increased and is in line with
the family group median but is lower than the
1
3
59

Page 60

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Scottish Average.  The increase can be
attributed to a number of areas including the
continuing investment in the secondary school
estate schools and costs for our PPP contract
commitments; costs associated with teachers’
salaries including pay award and pension costs
as well as additional cost of teachers based on
pupil growth and new initiatives in secondary
staffing from Council investment priorities.
There has been additional expenditure in
relation to COVID including staffing, cleaning
and PPE.
Like primary there has been a significant
reduction in the rates associated with
secondary schools during 2020/21 and an
increasing roll in the secondary sector
impacting on the cost per pupil in secondary.
Looked at in isolation this measure gives no
indication of the quality of the education
delivered. South Lanarkshire’s results are
linked directly to our position in maintaining our
level of spending on education relative to other
local authorities during a challenging economic
period. In addition, the council has invested
significantly in modernising its school estate in
supporting the delivery of high quality learning
environments for all pupils at all levels of their
education.
CHN 3 Cost per pre-school
education place
£4,614.00 £6,870.00 £8,337.00 £9,255.00 The cost per pre-school education in South
Lanarkshire has increased and is higher than
2
60

Page 61

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
the family group median but below the Scottish
average for a few main reasons: South
Lanarkshire has invested in its ELC service in
two main areas over and above the national
expansion plans and has introduced a new
policy around early access for 3 year olds with
full year costs supported during the year as
well as investment in our ELC staffing at new
evaluated grade.  Additionally, there has been
support for ELC fees and reflection of ELC
teachers within the pre-school sector.
Expansion spending was delayed to a certain
degree during 2020/21 in line with the change
to the national implementation of 1140 hours
and national closures; and plans for expansion
were delayed in relation to staffing, capital and
property costs and lunches that wasn’t
previously planned for.  This is likely to account
for an element of the variance to the Scotland
average based on SLC’s specific
implementation plans.
Expenditure on pre-school education is a
significant cost in terms of local authority
education. Comparisons between councils
enable an informed debate as to why variations
exist and where best practice exists and
lessons to be learned. Looked at in isolation
this measure gives no indication of the quality
of the education delivered.
CHN 4 Percentage of pupils 64.0% 66.0% 69.0% 67.0% Attainment figures for the years up to and
3
61

Page 62

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
gaining 5+ awards at
level 5
including 2019 are derived from different
awarding approaches than 2020 and,
separately, 2021. For 2019-20 and 2020-21,
the absence of external assessment
information and the Ministerial direction to
award estimated grades led to a different
pattern of attainment than seen in previous
years. The results for 2019-20 and 2020-21
should not be directly compared to those in
previous years or future years.
The positive difference in performance from
2019-20 to 2020-21 in South Lanarkshire is in
line with that in the family median and is above
the Scottish Average. Raising attainment and
achievement of all children and young people
helps to ensure that they are best prepared for
life beyond school and helps to tackle the
effects of poverty and disadvantage.
All attainment data for 2019-20 and 2020-21
must be considered in the context of the
ongoing Covid-19 pandemic.
CHN 5 Percentage of pupils
gaining 5 or more
awards at level 6
36.0% 39.0% 43.0% 41.0% Attainment figures for the years up to and
including 2019 are derived from different
awarding approaches than 2020 and,
separately, 2021. For 2019-20 and 2020-21,
the absence of external assessment
information and the Ministerial direction to
award estimated grades led to a different
pattern of attainment than seen in previous
years. The results for 2019-20 and 2020-21
4
62

Page 63

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
should not be directly compared to those in
previous years or future years.
The positive difference in performance from
2019-20 to 2020-21 in South Lanarkshire is in
line with that in the family median and the
Scottish Average. Raising attainment and
achievement of all children and young people
helps to ensure that they are best prepared for
life beyond school and helps to tackle the
effects of poverty and disadvantage.
All attainment data for 2019-20 and 2020-21
must be considered in the context of the
ongoing Covid-19 pandemic.
CHN 6 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 5
45.0% 46.0% 46.0% 49.0% Attainment figures for the years up to and
including 2019 are derived from different
awarding approaches than 2020 and,
separately, 2021. For 2019-20 and 2020-21,
the absence of external assessment
information and the Ministerial direction to
award estimated grades led to a different
pattern of attainment than seen in previous
years. The results for 2019-20 and 2020-21
should not be directly compared to those in
previous years or future years.
There was no change in performance from
2019-20 to 2020-21 in South Lanarkshire and it
is below the family median and the Scottish
Average. This measure is influenced by
curricular models and the selection of more
appropriate routes to positive destinations for
5
63

Page 64

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
young people. South Lanarkshire is focused on
raising attainment and achievement of all
children and young people helping to ensure
that they are best prepared for life beyond
school and helping to tackle the effects of
poverty and disadvantage.
All attainment data for 2019-20 and 2020-21
must be considered in the context of the
ongoing Covid-19 pandemic.
CHN 7 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 6
19.0% 22.0% 22.0% 23.0% Attainment figures for the years up to and
including 2019 are derived from different
awarding approaches than 2020 and,
separately, 2021. For 2019-20 and 2020-21,
the absence of external assessment
information and the Ministerial direction to
award estimated grades led to a different
pattern of attainment than seen in previous
years. The results for 2019-20 and 2020-21
should not be directly compared to those in
previous years or future years.
There was no change in performance from
2019-20 to 2020-21 in South Lanarkshire and it
is slightly above the family median and slightly
below the Scottish Average. This measure is
influenced by curricular models and the
selection of more appropriate routes to positive
destinations for young people. South
Lanarkshire is focused on raising attainment
and achievement of all children and young
people helping to ensure that they are best
6
64

Page 65

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
prepared for life beyond school and helping to
tackle the effects of poverty and disadvantage.
All attainment data for 2019-20 and 2020-21
must be considered in the context of the
ongoing Covid-19 pandemic.
CHN 8a The gross cost of
"Children Looked After"
in residential based
services per child per
week
£2,885.00 £3,086.00 £3,557.00 £4,380.00 While the costs have increased in the last year
for the gross cost of “Children Looked After” in
residential based services per child per week,
South Lanarkshire remains lower than the
Scottish average.  Work continues regarding
supporting young people within the community
resulting in lower numbers of children and
young people requiring services in residential
based services.  Evidencing South Lanarkshire
are committed to shifting the way care is
delivered to Looked After Children from a
residential-based to a community–based
model.
CHN 8b The gross cost of
"Children Looked After"
in a community setting
per child per week
£246.32 £272.67 £270.39 £382.18 Costs for “Children Looked After” in a
community setting have decreased slightly
over the last year and South Lanarkshire
Council has maintained a position of lower
costs than the Scottish average.  Work
continues regarding supporting young people
within the community resulting in lower
numbers of children and young people
requiring services in residential based services.
Evidencing South Lanarkshire are committed
to shifting the way care is delivered to Looked
After Children from a residential-based to a
7
65

Page 66

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
community–based model.
CHN 9 Percentage of children
being looked after in the
community
89.90% 90.46% 90.43% 90.30% South Lanarkshire Council’s position remains
above the Scottish average, despite a slight
decrease of 0.03% in our performance. The
overall numbers of children and young people
looked after in a community setting has
increased and for those supported in the
community.  Evidencing South Lanarkshire are
committed to shifting the way care is delivered
to Looked After Children from a
residential-based to a community–based
model.
CHN10 Percentage of Adults
satisfied with local
schools
76.13% 76.47% ------ ------ Data Not available
CHN11 Percentage of pupils
entering positive
destinations
95.7% 94.8% 96.2% 95.5% The percentage of pupils entering positive
destinations in South Lanarkshire increased
from the previous year and continues to be
above the national level.
CHN12a Overall Average Total
Tariff
896 936 1,009 972 Attainment figures for the years up to and
including 2019 are derived from different
awarding approaches than 2020 and,
separately, 2021. For 2019-20 and 2020-21,
the absence of external assessment
information and the Ministerial direction to
award estimated grades led to a different
pattern of attainment than seen in previous
years. The results for 2019-20 and 2020-21
should not be directly compared to those in
previous years or future years.
8
66

Page 67

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
The overall tariff level in South Lanarkshire in
2020//21 is above the national level. The tariff
scale provides a measure of the latest and best
achievement in each subject area for national
qualifications and a range of wider awards.
Qualifications are awarded tariff points based
on their Scottish Credit and Qualification
Framework (SCQF) level. Average tariff scores
are calculated from the latest and best
achievement of pupils during the senior phase
(S4-S6) across a range of awards included in a
national benchmarking tool. This offers a wider
measure of achievement to consider alongside
the narrower LGBF attainment measures (CHN
4 to CHN7). This measure can be influenced
by curricular models and the selection of more
appropriate routes to positive destinations for
young people.
All attainment data for 2019/20 and 2020/21
must be considered in the context of the
ongoing Covid-19 pandemic.
CHN13a % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
Literacy
72.0% ------ ------ ------ Data not available due to Covid-19
CHN13b % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
79.0% ------ ------ ------ Data not available due to Covid-19
9
67

Page 68

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Numeracy
CHN14a Literacy attainment gap
P1,4,7 combined - %
point gap between the
least deprived and most
deprived pupils
19.40% ------ ------ ------ Data not available due to Covid-19
CHN14b Numeracy attainment
gap P1,4,7 combined -
% point gap between
the least deprived and
most deprived pupils
15.37% ------ ------ ------ Data not available due to Covid-19
CHN17 % of children meeting
developmental
milestones
82.96% 82.87% 82.29% 85.06% The percentage of children meeting
developmental milestones in 2020-21 is 82.3%
remaining below the Scottish Average of 85.1
%. However, South Lanarkshire’s higher
figures of identification of concerns are due to
wider reach where 93.3 % of eligible children
had their review compared to Scotland 90.8%.
92.5% of children reviewed in South
Lanarkshire had meaningful data recorded in
all domains compared to Scottish average
position of 88.7 %. The greatest domain of
concern remains speech, language and
communication.
CHN18 % of funded early years
provision which is
graded good/better
93.75% 88.50% 89.69% 90.93% Performance in South Lanarkshire improved
from the previous year. It has been confirmed
that the increase in overall gradings observed
in the Scotland figure is due to an increase in
registration cancellations in services with
grades less than good - rather than
10
68

Page 69

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
improvements in inspected services.
We continue to work with the funded providers
not achieving the national standards grade of
good providing support, guidance and tailored
training as well as contributing to the
improvement programme with the Scottish
Government Improvement Unit.
Some funded providers have addressed the
areas for improvement and recent inspections
have confirmed this however, a few continue
on their improvement action plan.  The
Covid-19 restrictions, follow up inspection
activity by the Care Inspectorate and joint work
with the Scottish Government Improvement
Unit was paused for a period of time but has
resumed. We aim to provide a high-quality
learning experience for all children and we
recognise the value of giving our children the
best start in life.
The authority is unable to reduce the finance to
Early Years Partners. However, partners who
fall below the national standard can, if they do
not improve, have their contract terminated.
CHN19a School attendance rate 92.90% ------ 91.60% 92.00% The figures for 2020-21 were calculated only
whilst schools were open to all pupils and
pupils studying from home were eligible to be
counted in the attendance figures.
The school attendance rate fell between
11
69

Page 70

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
2018-19 and 2020-21 in South Lanarkshire, at
the national level and in the Family Group
comparator. Attendance in South Lanarkshire
is in line with both the national level and the
Family Group median.
Attendance in 2020-21 was affected by the
ongoing pandemic and minor differences in
attendance levels at authority and national
level may have been caused by the incidence
of Covid-19.
There was a higher incidence of pupil absence
across all sectors due to Covid-19 with
Lanarkshire having consistently high incidence
rates during 2020-21. Target for improvement
in the Resource Plan for 2022/23.
CHN19b School attendance rate -
looked after children
85.30% ------ ------ ------ Data Not available
CHN20a School exclusion rates
(per 1,000 pupils)
21.20 ------ 12.57 11.87 There was a significant reduction in the
average number of half days lost to exclusions
per 1,000 pupils. The level in South
Lanarkshire is slightly above the national level.
Figures for 2021-21 are not directly
comparable to previous years due to Covid-19.
CHN20b School exclusion rates
(per 1,000 looked after
children)
156.35 ------ ------ ------ Data Not available
CHN21 Participation rate for
16-19 year olds
92.64% 92.70% 92.79% 92.18% A young person is deemed to be participating
when they are actively engaged with an
organisation for the purpose of learning,
12
70

Page 71

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
training or work – work includes volunteering.
This annual participation measure reports on
the activity of the wider 16-19 year old cohort,
including those at school. South Lanarkshire's
performance improved slightly compared with
the previous years and is above both the
national average and the family group.
Performance for this measure must be seen in
the context of the ongoing Covid-19 pandemic.
CHN22 % of child protection
re-registrations within 18
months
5.91% 5.71% 6.47% 6.95% South Lanarkshire remain lower than the
Scottish average in relation to re-registrations.
Although, our performance has decreased a
little since 2019-20 there has been a slight
increase in re-registrations nationally with the
Scottish average also increasing.
Re-registrations are monitored quarterly within
the Child Protection Committee quarterly report
and Sub-groups to undertake audit activity on
re-registration cases as re-registrations could
suggest that the decision to initially de-register
from the child protection register was
premature and that children are not actually
safer.  However, South Lanarkshire figures
show that over the past few years’ children are
less likely to be re-registered on the South
Lanarkshire child protection register compared
to years 16/17 and 17/18 following intervention
showing sustained improvements.
CHN23 % LAC with more than 1
placement in the last
16.00% 11.96% 13.96% 16.79% The number of children whose placements
have been maintained in South Lanarkshire
13
71

Page 72

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
year (Aug-July) remains lower than the Scottish average.
South Lanarkshire strive to be the best
corporate parents they can be for those
children and young people whose needs are
best served by being in care. Placement
stability and consideration of the most effective
means of securing long term stability for a child
is at the forefront of our decision making.
CHN24 Percentage of children
living in poverty (After
Housing Costs) (New)
22.5% 23.1% ------ ------ 2020-21 data for this indicator is not currently
available and will be updated in the 2021-22
LGBF framework
Climate Change CLIM 1 CO2 Emissions area
wide per Capita
5.24 5.06 ------ ------ 2020-21 data for this indicator is not currently
available and will be updated in the 2021-22
LGBF framework
CLIM 2 CO2 Emissions area
wide: emissions within
scope of LA per Capita
3.97 3.78 ------ ------ 2020-21 data for this indicator is not currently
available and will be updated in the 2021-22
LGBF framework
Corporate Asset CORP
-ASSET1
Percentage operational
buildings that are
suitable for their current
use
96.30% 96.80% 96.41% 82.31% Performance has decreased slightly over the
last year but remains significantly above the
Scottish average. Continued implementation of
the Council’s asset management strategy and
plans has resulted in a clear focus in
optimising Council buildings to ensure they are
suitable.
A reassessment of all values for all assets has
also been carried out with individual Resources
and this together with a re-categorisation of a
number of assets and the exclusion of smaller
peripheral assets such as bothies has resulted
in a decrease in Suitability.
14
72

Page 73

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
CORP
-ASSET2
Percentage internal floor
area of operational
buildings in satisfactory
condition
87.40% 87.50% 87.78% 89.20% Performance has increased and remains
above the Scottish average. Despite the
current financial climate and reduced funding
to Scottish Local Authorities, the figures show
that, through programmes of Prioritised Capital
Investment and Planned Preventative
Maintenance, performance remains positive for
the majority of categories of property.  The
restrictions placed on capital investment during
the current capital programme will provide
challenges to sustained performance and we
will continue to challenge the requirement for
our assets, retaining only those that support
our strategic objectives, in order to establish a
core estate.
We continue through the Asset Management
process to discuss with Services the
opportunities to reduce the number of assets
and work towards our aim of achieving a
sustainable core estate.
Plans are currently fluid as we have been
unable to evaluate the full impact of changes to
how services will be delivered post Covid.
Next year we anticipate the SLLC review being
discussed again, and the South Lanarkshire
Health and Social Care Partnership are
commencing a locality review. It is anticipated
these reviews, together with a review of office
accommodation, will lead to changes to the
asset base.
15
73

Page 74

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Corporate Services CORP1 Support services as a
percentage of total
gross expenditure
4.32% 4.01% 3.75% 4.06% There has been a small decrease in the cost of
support as a percentage of total budget – this
is a combination of a reduction in support costs
due to savings, mainly within Finance and IT
Services, and also an increase in the total net
budget.  These result in an overall decrease in
percentage.
CORP3b The percentage of the
highest paid 5%
employees who are
women
48.80% 51.98% 55.27% 58.30% There has been an increase in the proportion
of women in the top 5% earners in the Council
between 2019-20 and 2020-21.  This is due to
the significant number of women who have
received an increment or have been regraded,
thus increasing their earnings at the grades
included in the top 5%.
We continue to work in line with our current
policies and processes to ensure that our
female employees at that top end (which can
shift depending on where the 5% falls), are
being progressed appropriately. Our picture is
improving year on year and we need to keep a
focus on that along with the work that we
continue to do in line with our equalities duties.
CORP3c The gender pay gap 5.10% 5.10% 4.83% 3.66% Although the gender pay gap position in South
Lanarkshire Council is improving, South
Lanarkshire’s performance compares less
favourably to other councils because they have
outsourced services with predominantly female
workforces.
Personnel services carry out regular and
continual Equal Pay Audits to monitor pay to
16
74

Page 75

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
identify any unfair, unjust or unlawful practices
that impact on pay, and take appropriate
remedial action. We will continue to plan and
implement actions in partnership with trades
union representatives in the line with the
principles of ‘Delivering a fairer future’; provide
training and guidance for those involved in
determining pay; monitor pay statistics
annually in addition to conducting council-wide
Equal Pay Reviews in accordance with our
equalities duties.
The council has living wage accreditation. We
have restructured and streamlined Pay Grades
and levels to ensure consistency and fairness
across all levels.
We continue implementing our Delivering a
Fairer Future policy to encourage a reduction
in occupational segregation.
CORP4 The cost per dwelling of
collecting Council Tax
£6.63 £6.48 £6.46 £6.64 The cost of collecting council tax per dwelling
in 2020-21 has reduced compared to 2019-20
due to a reduction in diligence fees and an
increased number of chargeable properties.
South Lanarkshire’s performance continues to
be better than the Scottish average.
The cost of collecting council tax will continue
to be managed closely through regular
monitoring and reporting of relevant
expenditure.
CORP6a Sickness absence days
per teacher
6.10 7.25 5.12 4.16 The number of working days lost for full time
equivalent (FTE) teachers has decreased by
17
75

Page 76

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
2.4 days, compared with last year. The
reduction can be attributed to employees
working from home due to Covid 19 restrictions
and a reduction in short term absences.
Despite this, South Lanarkshire’s result
continues to be worse than the Scottish
average.
We continue to provide a number of supports
for managers, including single points of
contact, monthly meetings with HR and Heads
of Service to discuss and support long term
absence cases as well as recurring absences.
Localised briefings and training sessions are
undertaken as required and Learn on Line
Webinars have been developed in order to
advise and support managers on the
Maximising Attendance Procedures.
CORP6b Sickness absence days
per employee (non
teacher)
11.90 12.76 10.11 9.71 The number of working days lost for full time
equivalent (FTE) employees has decreased by
2.65 days, compared with last year. The
reduction can be attributed to employees
working from home due to Covid 19 restrictions
and a reduction in short term absences.
Despite this, South Lanarkshire’s result
continues to be worse than the Scottish
average.
We continue to provide a number of supports
for managers, including single points of
contact, monthly meetings with HR and Heads
of Service to discuss and support long term
18
76

Page 77

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
absence cases as well as recurring absences.
Localised briefings and training sessions are
undertaken as required and Learn on Line
Webinars have been developed in order to
advise and support managers on the
Maximising Attendance Procedures.
CORP7 Percentage of income
due from Council Tax
received by the end of
the year
96.20% 95.90% 95.55% 94.77% The reduction in income received was largely
due to the ongoing impact of the Covid 19
pandemic, including the suspension of
recovery action for the first 4 months of
2020-21.
South Lanarkshire’s performance continues to
be better than the Scottish average.
The council will continue to work to maximise
council tax income collection in 2021-22,
utilising all available recovery methods.
CORP8 Percentage of invoices
sampled that were paid
within 30 days
92.10% 89.50% 90.87% 91.76% The percentage of invoices paid within 30 days
exceeded the annual target of 90% and has
improved compared with the previous year.
However, it is still below the Scottish average.
Finance staff proactively discuss issues with
Resources on a regular basis and work
together to improve performance.
Additionally, 2020-21 performance was
impacted by Covid.
Culture & Leisure
Services
C&L1 Cost per attendance at
sports facilities
£2.56 £2.77 £52.49 £40.36 The cost per visit in South Lanarkshire was
£12.13 above the Scottish average of £40.36,
however, it should be noted that historically,
South Lanarkshire has consistently kept costs
per visit in line with the Scottish average.
19
77

Page 78

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
As with all authorities across Scotland,
services were severely disrupted or closed
during 2020/21 in accordance with Scottish
Government guidelines throughout the
Covid-19 pandemic. SLLC reintroduced limited
services in line with South Lanarkshire
Council’s Covid Recovery Plan, however some
SLLC staff were redeployed to assist with the
Covid response, and therefore some buildings
remained closed, due to both staffing/financial
pressures, and attendances were also affected
with some sites being utilised as mobile Covid
testing stations/vaccination centres.
Furthermore, South Lanarkshire remained
under higher level restrictions for extended
periods of time and therefore the cost per visit
will not be a true comparison across all
authorities.
It is difficult to draw any conclusions from the
2020/21 data, when historically (previous 10
years), the average cost per visit in South
Lanarkshire was £2.60 and across Scotland it
was £3.00. Visitor numbers continued to
increase against a backdrop of reductions in
real net expenditure - over the last 10 years
revenue expenditure in Culture and Leisure
has decreased by 26% across Scotland and
28% in South Lanarkshire, whilst the number of
20
78

Page 79

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
assets has remained largely unchanged over
the past 10 years, although some assets are
now in need of significant investment.
Our Activage Membership attracts almost 20%
of our 60+ age group and although we offer
this at a very low cost, it actively encourages
our more mature customers to keep active, this
membership is predicted to continue to grow in
the future (with over 25% of residents in this
age group).  A recent change in policy to permit
SLLC to set competitive pricing across services
allowing us to follow market trends will
undoubtedly help us to remain competitive
going forward.
C&L2 Cost per library visit £3.62 £3.00 £5.93 £2.88 The cost per library visit in South Lanarkshire
in 2020-21 has increased by £2.93, and
although our costs remain higher than others in
our family group, this increase is proportionate
with those members. On a positive note, our
rank positioning has improved by 4 places to
21st in the overall ranking. Many libraries
remained open when guidance allowed,
however, with the on-going restrictions and
minimum events being delivered, footfall was
slow to recover, although this was offset by an
increase in virtual visits by almost 10%.
It is difficult to draw conclusions from the
2020/21 data. As with all authorities across
21
79

Page 80

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Scotland, services were severely disrupted or
closed in accordance with Scottish
Government guidelines throughout the ongoing
Covid-19 pandemic since March 2020.
SLLC reintroduced limited services in line with
South Lanarkshire Council’s Covid Recovery
Plan, however some SLLC staff were
redeployed to assist with the Covid response,
and therefore some buildings remained closed
due to both staffing/financial pressures.
Furthermore, South Lanarkshire remained
under higher level restrictions for extended
periods of time and therefore the cost per visit
will not be a true comparison across all
authorities.
Over the last 10 years revenue expenditure in
Culture and Leisure has decreased by 26%
across Scotland and 28% in South
Lanarkshire.
SLLC continue to operate 24 library sites
following the closure of Westwood Library in
March 2013 and Calderwood Library in July
2015, without reductions in staffing levels and
opening hours since 2015/16. Physical visits to
library buildings have declined, and although
virtual users have increased, this overall effect
has had an impact on the cost per visit.
22
80

Page 81

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Operating costs of a home delivery service and
mobile library service are high due to being
staff intensive and incurring higher than
average costs for vehicle maintenance, due to
the age of the mobile library vehicles.   The
cost of delivering this service is therefore high
against a small customer base.
C&L3 Cost of museums per
visit
£2.92 £2.93 £13.14 £10.14 It is difficult to draw conclusions from the
2020/21 data. The cost per visit in South
Lanarkshire is £3 above the Scottish average
of £10.14, however visitor numbers were
affected not only by enforced government
closures but also the site at Low Parks
Museum being identified as a mobile Covid
testing station.  Nevertheless, our rank
positioning has remained the same at 14th in
the overall ranking, and historically (previous
10 years) the average cost per visit in South
Lanarkshire was £3, compared to £3.45 across
Scotland. South Lanarkshire has consistently
kept costs per visit below the Scottish average.
It should be noted that admission into Low
Parks Museum is free, however both the
museum and Hamilton Mausoleum offer a
select variety of commercial opportunities, and
since 2014, the Museum Service has been
successful in attracting £246,257 funding to
23
81

Page 82

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
support many of our collections and museum
development projects which helps offset net
expenditure.
C&L4 Cost of parks and open
spaces per 1,000
population
£24,710 £25,533 £31,254 £19,112 The costs associated with our ground’s
maintenance operations increased from
£25,533 per 1,000 population in 2019-20 to
£31,254 in 2020-21, however this can mainly
be attributed to Covid-19 safety measures
including additional PPE, depot signage and
safety, and the need for additional vehicles.
This figure continues to be above the Scottish
average of £19,112, however this is due to the
fact that SLC work to a high specification on all
council land and all maintenance operations
including, general open spaces, parks, sports
areas, golf courses, bowling greens, care of
gardens, back courts and cemeteries, and all
of these services are included within the overall
net controllable expenditure.
We operate with a large fleet of both cut and
collect and cut and drop ride-on mowers as
well as a large fleet of tractors with batwing
mowers to ensure the bulk of our grass grade 3
is maintained to the relevant standards, costs
alone associated with just this operation come
in at £3 million. Previous savings proposals in
this area have been rejected by Elected
Members.
24
82

Page 83

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Other examples of our high specification can
be seen in our herbicide application. We have
done a significant amount of work reviewing
our use of herbicide during 2021, however, we
still continue to apply glyphosate-based
herbicides to over 5,250,000m2 of hard stand,
kerb line, shrub bed, grass edges, blaes
surfaces twice per annum using quad bikes
and back mounted knapsack sprayers. During
periods of inclement weather such operations
need to be repeated.
We maintain 6 golf courses throughout the
district, these are high maintenance areas
requiring specialist skills and machinery to
ensure the provision of golf courses to the
highest possible standard. Likewise, we have a
number of bowling greens which again are high
maintenance areas.
We have 55 cemeteries spread throughout
South Lanarkshire which are also maintained
to the highest possible standard due to their
very nature and what they represent to the
local community.
Consideration should also be given to the
sheer size of SLC and the fact that large
sections, particularly in the more rural areas,
25
83

Page 84

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
can lead to additional travel time for crews and
this needs to be included in our overall costs.
C&L5a Percentage of adults
satisfied with libraries
70.57% 69.90% ------ ------ Data from The Scottish Household Survey is
not yet available for this year, and although
customer feedback is very important to SLLC,
in 2020-21 we were not able to measure
satisfaction through our usual Exit Interview
process due to the closure of sites and
restricted programmes operating with minimal
staff and others redeployed to assist with the
Covid response.  However, SLLC conducted an
online survey during 2020/21 to assess if our
customers were accessing the virtual
programme of activities established to help
support users during lockdown periods. 649
people responded, 26 (4%) directly related to
Library and Museum Services, with an overall
86% of respondents rating activities as
excellent or good.
C&L5b Percentage of adults
satisfied with parks and
open spaces
80.43% 77.10% ------ ------ Data from The Scottish Household Survey is
not yet available for this year. The results of
these surveys are however based on
individuals’ views and perceptions and do not
link into our expenditure in relation to the South
Lanarkshire specification or indeed the overall
scope of service areas such as golf courses,
bowling greens and cemeteries, which many
residents may not use directly or be aware that
these are included within our overall
expenditure.
26
84

Page 85

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Work is ongoing to develop our own
consultation document that we would like to
utilise and distribute to residents to gauge their
views and opinions in regards to Participatory
Budgeting exercises, but also perhaps to help
gain a greater insight into the current services
and standards that we provide.
C&L5c Percentage of adults
satisfied with museums
and galleries
68.37% 65.37% ------ ------ Data from The Scottish Household Survey is
not yet available for this year, and although
customer feedback is very important to SLLC,
in 2020-21 we were not able to measure
satisfaction through our usual Exit Interview
process due to the closure of sites and
restricted programmes operating with minimal
staff and others redeployed to assist with the
Covid response.  However, SLLC conducted an
online survey during 2020/21 to assess if our
customers were accessing the virtual
programme of activities established to help
support users during lockdown periods. 649
people responded, 26 (4%) directly related to
Library and Museum Services, with an overall
86% of respondents rating activities as
excellent or good.
C&L5d Percentage of adults
satisfied with leisure
facilities
68.27% 66.60% ------ ------ Data from The Scottish Household Survey is
not yet available for this year, and although
customer feedback is very important to SLLC,
in 2020-21 we were not able to measure
satisfaction through our usual Exit Interview
27
85

Page 86

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
process due to the closure of sites and
restricted programmes operating with minimal
staff and others redeployed to assist with the
Covid response.  However, SLLC conducted an
online survey during 2020/21 to assess if our
customers were accessing the virtual
programme of activities established to help
support users during lockdown periods. 649
people responded, 548 (84%) directly related
to sport and physical activities, with an overall
86% of respondents rating activities as
excellent or good.
Economic Development ECON 1 Percentage of
unemployed people
assisted into work from
council funded/operated
employability
programmes
15.09% 16.00% 5.54% 5.98% The percentage unemployed people assisted
into employability programmes declined this
year and fell short of the annual target of
15.1%. Performance was also below the
Scottish average.
Financial year 2020-21 was at the height of the
global pandemic. Economic lockdowns,
business closures impacted on progressing
clients/jobseekers to job opportunities. South
Lanarkshire was the 3rd highest local authority
area for employed workers seeking support
from the Job Retention Scheme with significant
numbers of employees being furloughed
resulting in less people actively seeking work
as they were deemed employed status through
the Job Retention Scheme. Typically, the
service sector accounted for a high proportion
28
86

Page 87

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
of business closures and young people were
disproportionately affected as they made up a
large part of the service sector workforce. The
local labour market was in a state of flux.
Unemployment did rise for certain groups
however furlough did mask the true impact of
the pandemic. Families had to re-think seeking
employment due to school and early year
facility closures, balancing childcare
challenges.
Furthermore, the health crisis was affecting
health and wellbeing for many households,
self-isolation periods, illness and confidence
were all key factors impacting our local
residents from taking up employment.
Universal "Top Up" payments provided
additional funding to support families through
the pandemic resulting in households being
better off financially, therefore less likely to
seek employment as the global crisis
continued to hit.
In addition, there was no claimant commitment
conditions applied to jobseekers claiming UC
and JSA due to the pandemic, which impacted
in a decrease of Jobseekers engaging with
DWP work coaches affecting the flow of
referrals to council operated employability
programmes.
Routes to work South Lanarkshire (RTWS)
closure adversely impacted on engagements
29
87

Page 88

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
and jobs. There is normally high levels of
footfall within RTWS services across South
Lanarkshire, as a grass roots employability
service.
Moving away from face-to-face delivery to
digital was challenging, particularly for clients
who had no or limited IT capacity and
capability. We did secure over 80 Laptops and
MIFI devices for clients from Connecting
Scotland to engage clients with employability
services. Further added complexities
surrounding EU compliance, securing the
necessary paperwork and compliance digitally
initially proved challenging to ensure all the
necessary GDPR and EU requirements were
met.
There was a focus on in work up-skilling
support (figures not reported in LGBF
indicators) as those progressing through Up
skilling are employed. The focus was to ensure
we could support employers in the pandemic,
for example, in care, ensuring current upskilling
continued to support an industry in crisis.
In contrast the previous year 2019-20 saw 16%
assisted into work compared to 5.54% in
2020-21. Unemployment claimant count stood
at 3.5% in 2019-20 compared to 2020-21
where the claimant count was 6.3%. Normally
the higher the claimant count the higher
engagements and job outcomes; however, this
30
88

Page 89

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
was not the case. Possible School Leavers
stayed on at school, less engagements due to
employability provision closure, moving to
digital delivery, statutory lock downs, employer
closures and significant reductions in employer
recruitments all contributory factors as to why
the percentage of jobs is much lower than the
previous year. The introduction of Youth
Guarantee and Kickstart, flagship programmes
would need time to be fully embedded -  we are
now seeing the results in 2021-22 as our local
economy starts to rebuild and gain confidence.
ECON 2 Cost of planning and
building services per
application
£3,857.00 £5,118.00 £4,334.00 £5,044.00 The overall cost of Planning and Building
Standards per application in 2020-21 fell
compared to the figure in 2019-20 and was
lower than the Scottish average.  During
2020-21 overall fee income increased while
applications numbers increased marginally
from 4,103 to 4,180.  At the same time this
period saw the retirement of two officers with
another 4 starting a flexible retirement working
pattern. Only one officer was recruited during
the period.
ECON 3 Average time per
business and industry
planning application
(weeks)
13.02 Wks 18.34 Wks 16.75 Wks 11.08 Wks The average time for processing
business/industrial planning applications in
South Lanarkshire decreased from 18.34
weeks in 2019-20 to 16.75 weeks in 2020-21,
which is a step in the right direction, however,
this figure is below the Scottish average and
the Council is in the 4th quartile in terms of
31
89

Page 90

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ranking.
In the business and industry category, there
were only 39 applications determined in total
during the 2020-21 period, of which two were
legacy applications.  Whilst not the sole
reason, the legacy applications do tend to
skew the figures as they both took
approximately 65 weeks to determine.
We are working to reduce the number of
legacy and overdue applications, and training
will be given to officers regarding the use of
‘stop the clock’ and processing agreements
which will ensure that the council are not
unfairly affected in terms of performance by
matters out with our control. We also do try and
work with developers in order to achieve a
positive outcome, and in some instances, this
additional negotiation is preferable to a quick
refusal, even though it can result in
applications taking longer to determine.
It is important also to bear in mind that this
reporting period coincided with the restrictions
imposed by the Covid-19 pandemic which
introduced a number of challenges for both the
Planning service and those involved in the
making and processing of applications,
including applicants/agents and consultees. In
32
90

Page 91

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
addition, the service saw 6 officers either
commence flexible retirement or retire
completely but only one officer was recruited in
the same period. A review of the structure of
the service was completed in the summer of
2020 which is intended to strike a better
balance of the resources available.
ECON 4 Percentage of
procurement spend on
local enterprises
18.07% 18.02% 16.99% 29.11% Percentage of spend reduced from 18.02% in
2019-20 to 16.99% in 2020-21. This figure is
below the Scottish average of 29.11%, and
places South Lanarkshire in 28th place out of
all the authorities.
In support of the Community Wealth Building
Strategy, officers have analysed the 2020-21
expenditure in order to better understand the
geographical profile of our core trade
expenditure within South Lanarkshire, across
Lanarkshire as a whole, Glasgow City Region
and Scotland.
For the purposes of local spend, only
companies registered within South Lanarkshire
are included
Improved procurement practices and
engagement with local businesses to influence
local spend levels and are being progressed.
Actions will continue to be taken to progress
further understanding of the factors that
33
91

Page 92

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
influence the level of local spend, including:
•Analysis of the mix of South Lanarkshire
businesses and how it compares to those in
North Lanarkshire.
•Further analysis of council spend across the 5
levels comprising:
oSLC
oPan-Lanarkshire
oGlasgow City Region
oScotland
oOut with Scotland
•Analysis of the spend leakage report provided
by Grow Local (a Scottish Government
reporting tool). This details the areas where
spend takes place out with South Lanarkshire,
highlights the availability of potential suppliers
in South Lanarkshire and therefore where
opportunities may exist to increase local spend
with these businesses.
•Put in place the appropriate arrangements to
be able quantify the level of sub-contracting
spend with South Lanarkshire businesses.
This will continue to be monitored via the
Community Wealth Building Plan.
ECON 5 No of business gateway
start-ups per 10,000
population
15.30 13.98 8.95 11.19 There has been a general reduction in
recorded Business Gateway start-ups in the
period 2020-21 owing to the impact of the
Covid pandemic with a general reduction in
Business Gateway enquiries and the cessation
34
92

Page 93

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
of a menu of in person workshops and events.
A new Business Gateway contractor, Elevator,
has taken over the Lanarkshire Business
Gateway contract from 1 March 2021 and
business start-ups are beginning to improve
once more.  In 2021-22, there were
approximately 15.3 Business Gateway
start-ups per 10,000 population, against a
general downturn in economic activity as a
consequence of Covid-19.
The Business Gateway contractor has also
been awarded additional funding from the
Community Renewal Fund (CRF) and tasked
with focusing support in traditionally harder to
reach localities in rural area and areas of
deprivation, together with a mobile business
support engagement unit, with the challenge of
increasing business start-ups in these areas.
ECON 6 Investment in Economic
development and
Tourism per 1,000
population
£48,813 £47,216 £44,293 £87,793 Investment in Economic Development and
Tourism per 1,000 population reduced from
£47,216 in 2019-20 to £44,293 in 2020-21.
Investment has been reducing in many areas
during the austerity period where non statutory
services have been vulnerable to budget cuts.
However, decreasing expenditure in services is
not necessarily an indicator of efficiency or
value for money.
35
93

Page 94

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
In South Lanarkshire increased budget has
been provided to fund a Get South Lanarkshire
Working programme and at the same time a
Community Wealth Building Strategy has
increased focus and understanding of the
importance of economic development.
However, owing to the ongoing impacts of the
Covid pandemic, it has been challenging to
resource and make significant progress with
this work when presented with a number of
Scottish Government funded business support
programmes which have absorbed resources
to administer these grants.
ECON 7 Proportion of people
earning less than the
living wage
20.30% 17.80% 20.80% 15.20% The latest figures (Office for National Statistics,
Annual Survey of Hours and Earnings 2020)
indicates that there has been a +2.8% increase
in the percentage of employees in South
Lanarkshire earning less than the living wage.
South Lanarkshire continues to record a higher
level of employees earning less than the living
wage than the national average, with the latest
figures (December 2020) +5.3% above the
Scottish Average.
The most recent statistics for 31st March 2021
suggest that the number of Living Wage
Employers in South Lanarkshire has increased
slightly (+3, from 90 up to 93) over the 12
months 31st March 2020 to 31st March 2021.
South Lanarkshire continues to rank 4th
36
94

Page 95

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
highest in Scotland for the number of
accredited Living Wage employers, when
compared against the other 32 council areas,
with only Glasgow, Edinburgh and Highland
with superior numbers.
South Lanarkshire Council continues to
support and encourage all employers to ensure
as many people as possible earn the living
wage.
ECON 8 Proportion of properties
receiving superfast
broadband
94.50% 95.60% 96.20% 93.79% In 2020-21, 96.20% of properties in South
Lanarkshire had access to high speed
broadband and speeds greater than 30 Mbps.
This was an improvement on the previous year,
and remains above the Scottish average figure.
The Council works with the Scottish
Government’s Digital Scotland Superfast
Broadband Programme, which is contracted
with BT Openreach, to install superfast
broadband across Scotland. The Council
ensures roads access, way leaves and
planning issues are progressed efficiently and
to ensure maximum investment within the area.
In November 2019, the Scottish Government
awarded two of the Reach 100% (R100)
contracts to BT Openreach. These 2 contract
areas (central and south) cover South
Lanarkshire. This construction contract
investment, alongside additional Scottish and
37
95

Page 96

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
UK Government vouchers for householders
and businesses that could not access high
speed broadband by the end of 2021, provide
the opportunity for most properties to access
support for high speed broadband provision.
Areas around Thankerton and Dunsyre have
had investment in 2021 and investment by the
R100 programme in South Lanarkshire will
continue in 2022.
The provision of ultra-fast broadband providing
speeds of greater than 300Mbps is being rolled
out by the private sector in South Lanarkshire
and coverage currently represents 19.86% of
properties. Economic Development, along with
IT Services, is working with the private sector
to help accelerate the roll out of ultra-fast
through full fibre broadband in the Council
area.
ECON 9 Town vacancy rates 10.38 12.75 8.80 12.41 The vacancy rate decreased in 2020-21,
putting South Lanarkshire below the Scottish
Average.
Vacancy rates across South Lanarkshire held
up reasonably well through the first year of the
Covid-19 pandemic, however, there is bit of
fluctuation across the various towns, and we
continue to work with the relevant
stakeholders. As examples, Larkhall,
Cambuslang, Strathaven and Biggar generally
have lower vacancy rates; Rutherglen and
38
96

Page 97

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Carluke have improved in recent years to be
more in line with the average, and Lanark and
Hamilton stay reasonably steady on or slightly
above the average in the overall vacancy rate
albeit there is a greater turnover of units than in
other towns.
East Kilbride has a high vacancy rate and is an
ongoing challenge on which we are working
closely with the owners, although rates here
can often appear higher than the actual
position due to facilitating development works.
The rate in Blantyre is expected to improve
when the next available data is issued as the
full impact of the remodelling of the Asda units
was not available in the previous data.
Despite this position there remains much to be
done in our town centres as we move to a
position of reduced or no Covid related
financial support for businesses. The range of
support Economic Development can provide
on behalf of the council and the capital projects
to address specific issues will be key to the
success going forward.
ECON10 Immediately available
employment land as a
% total land allocated
for employment
39.13% 38.50% 37.47% 38.91% In 2020-21, there was a slight decrease in the
supply of marketable land as a proportion of
total allocated employment land at 37.5%,
which is down from 38.5% in 2019-20. This
39
97

Page 98

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
purposes in the local
development plan
brings South Lanarkshire just below the
Scottish average.
A reduction in immediately available
employment land is, however, a positive sign
that South Lanarkshire remains an attractive
investment location.  The market for industrial
space has been very active over the last 2
years with private developers taking advantage
of strong demand and healthy rental levels at
key locations to construct new industrial units
for lease.
Some sites that have been developed have
been available for a number of years, and the
take up of these historic sites will continue.
However, the private sector will not seek to
prepare and offer new sites to the market on a
proactive basis due to their need to realise
development returns over a relatively short
period of time.
Historically, the public sector has stepped in
during periods of market failure to bring
forward sites capable of development and this
remains the case, particularly at key locations
such as Clyde Gateway and East Kilbride. The
site at Langlands, East Kilbride, owned by
SLC, will be a key location in the coming years
that could increase the supply of marketable
40
98

Page 99

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
land available for development in the short to
medium term.
Clyde Gateway activity at Shawfield Phase 2
will bring forward sites that can be defined as
marketable employment land as their
remediation activity ramps up over the next 2-3
years.
Other sites in more peripheral location are
likely to benefit from the upturn in demand
however some of these available sites may be
less attractive for some uses due to their
distance from larger urban settlements with an
available workforce and more developed
transport links.
The increase in online shopping activity has
also generated a number of large-scale
enquiries for storage and distribution space
and it is anticipated that sites such as
Canderside, Larkhall may benefit from this due
to its prime location adjacent to the M74. We
are currently in discussions with another
landowner in that location to maximise
opportunities
As we move forward the way industrial and
business land supply is categorised will be
subject to change. There were up to 16
41
99

Page 100

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
categories. These will be reduced to 7
categories to provide a more accurate picture
of what is available, and define 4 of those
categories in a more specific way, and thereby
provide more focussed opportunities to review
land use as part of the Local Development
Plan process.
Economic Development will seek to increase
marketing of key investment sites as the new
Economic Strategy is implemented and will
also compliment this with support for new
industrial development by the private sector,
identification and appraisal of potential new
investment sites, and opportunities to maintain
an adequate supply of employment -land
through collaboration with private and public
sector partners.
ECON11 Gross Value Added
(GVA) per capita (New)
21,099 20,884 ------ ------ 2020-21 data for this indicator is not currently
available and will be updated in the 2021-22
LGBF framework
ECON12
a
Claimant Count as % of
Working Age Population
(New)
3.6% 3.5% 6.3% 6.1% The claimant count as a percentage of working
age population increased to 6.3% to March
2021. This increase reflects the state of the
local labour market as the impact of Covid
starts to hit our local economy.
Council operated employability programmes
contribute to the overall claimant count
reduction moving unemployed people from
welfare to work. Other LEP partners and
42
100

Page 101

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
providers deliver employability services
including the national Fair Start Scotland (FSS)
programme who also move clients into work.
The on and off flows of claimant unemployment
will vary month to month subject to changes in
the labour market.
ECON12
b
Claimant Count as % of
16-24 Population (New)
4.5% 4.4% 7.8% 7.2% The claimant count as a percentage of 16-24
population increased to 7.8% at March 2021.
The impact of Covid adversely impacted the
younger client groups aged 16-24  compared
to the general age working population. This
was largely due to young people leaving
university and college with limited job
opportunities due to economic lockdowns,
business closures and furlough.
Young people were disproportionately affected
in 2020-21with more young people working in
the service sector, particularly hospitality that
bared the brunt of the pandemic. Council
operated employability programmes contribute
to the overall claimant count reduction moving
unemployed people from welfare to work.
Other LEP partners and providers deliver
employability services including the national
Fair Start Scotland (FSS) programme who also
move clients into work. The on and off flows of
claimant unemployment will vary month to
month subject to changes in the labour market.
Environmental Services ENV1a Net cost of waste
collection per premise
£79.55 £77.07 £79.87 £72.35 The net cost of waste collection per premises
increased in 2020-21 and is above the Scottish
43
101

Page 102

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Average. The higher costs reflect the council’s
continued decision to provide a range of
services free of charge to residents. Unlike
most councils in Scotland, South Lanarkshire
continues to provide a free uplift service for
bulky waste and in 2020-21 households were
provided with additional uplifts (up to a
maximum of three) in a bid to help residents
manage the excess waste associated with the
Covid-19 pandemic. The council also does not
charge for garden waste bin collections.
Chargeable garden waste uplifts are becoming
increasingly more common in Scotland and
allow the councils who implement a charge to
offset collection costs. The council also
provides free compostable bags to residents
whilst the majority of other councils do not.
The whole waste service is likely to be
reviewed, including these policy areas, as part
of the development of the new waste strategy;
the terms of reference for which is currently
being considered.
ENV2a Net cost of waste
disposal per premise
£97.90 £97.86 £110.57 £104.50 The net cost of waste disposal per premises
increased in 2020-21 and is now above the
Scottish Average. The increase in costs is a
direct result of the fact that a significant
amount of additional waste was produced by
householders during the Covid-19 lockdowns.
Waste that would have normally been disposed
of in commercial bins (offices, hospitality etc)
44
102

Page 103

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ended up in household bins and residents
under ‘stay at home’ orders undertook clear
outs and DIY projects at home. The additional
waste being generated by householders ended
up in recycling bins as contamination. Higher
contamination rates resulted in higher costs for
disposal of the material in recycling bins. It is
also worth noting that South Lanarkshire sends
the residual waste it collects from
householders to an Energy from Waste (EfW)
facility, rather than to landfill. This means that
the council has a high landfill diversion rate in
comparison to local authorities that are still
procuring a solution to the forthcoming landfill
ban; however, treatment costs are higher than
landfill and that impacts on the net cost of
waste disposal.  The whole waste service is
likely to be reviewed as part of the
development of the new waste strategy; the
terms of reference for which is currently being
considered.
ENV3a Net cost of street
cleaning per 1,000
population
£17,607.00 £17,487.00 £15,610.00 £14,845.00 The costs associated with our street cleaning
operations decreased from £17,487 per 1,000
population in 2019-20 to £15,610 in 2020-21.
The figure is still however above the Scottish
average of £14,845.
The higher costs associated with our street
cleaning operation are attributed to the high
levels of services that we provide: graffiti
45
103

Page 104

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
removal, street cleaning including shifts, fly
tipping uplift, fly posting removal, blood spills,
hypodermic needle uplift, dead animal uplift
and the large mechanical fleet that we utilise.
SLCs mechanical fleet is on a level with
perhaps only 1or 2 other local authorities in
Scotland, and certainly in advance of the vast
majority, and performs not only an essential
service but also a legislatively required service.
The new COPLAR legislation has introduced
duty 2, which relates directly to the removal of
detritus from roads/channels.
Since the recruitment of the Environmental
Initiatives Officer work has been ongoing in a
number of areas to raise the profile of litter and
the impacts on the environment and on the
council budget to deal with issues such as fly
tipping and general littering.
The development of the Litter Strategy has
been ongoing throughout 2021 and the revised
timeline of June 2022 will see more sustained
work on the ground to help push this forward
and help to reduce our litter problems in the
future.
ENV3c Street cleanliness score 94.90% 94.75% 94.05% 90.10% South Lanarkshire Council continues to score
higher for its street cleansing service than the
Scottish average, with 94.1% of streets
46
104

Page 105

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
surveyed found to be of an acceptable
standard. This is down slightly from 94.8% in
2019-20.
The results of the streets survey are based on
an individual’s views and perceptions on what
they would like to see being done against what
we actually do, however, respondents are
perhaps unaware of the full extent of the work
and services that we provide. For instance,
SLC maintain over 4,000 litter bins and have
one of the largest fleet of mechanical sweepers
which we require to ensure that the leaves,
litter, detritus and road salt are kept off our
road network.
Whilst our LEAMs scores are down slightly, we
are still above the Scottish average, and it
should be considered that since March 2020
we have had to introduce a more fluid service
to protect our staff who have been working at
the front line during the Covid-19 pandemic to
continue to ensure that our streets remain
clean and tidy, bins are emptied, and fly tipping
is removed.
It should also be noted that the Street
Cleansing service were finalists in the 2021
APSE Service Awards for the whole of the UK
in the category of “Best performer in Street
47
105

Page 106

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Cleansing”.
ENV4a Cost of roads per
kilometre
£16,903.00 £16,493.00 £19,542.00 £9,667.00 Spend per kilometre of road has increased
compared to the previous year. It remains
higher than the Scottish average, reflecting the
council decision to invest in the road network to
address poor road conditions. It should be
noted that road maintaining authorities, and the
wider construction sector, are seeing increased
costs associated with the Covid-19 pandemic,
and in more general, rapidly increasing
construction inflation associated with material
and subcontractor costs.
ENV4b Percentage of A class
roads that should be
considered for
maintenance treatment
23.30% 23.18% 23.90% 29.80% There has been a marginal regression in the
condition of A Class roads in South
Lanarkshire, however, the condition of the A
class network is 5.9% better than the Scottish
average.   This is primarily due to more
investment being directed towards unclassified
roads, which are often now in the poorest
condition, with much of the A class network
having been treated in earlier years of the
Investment Plan.
ENV4c Percentage of B class
roads that should be
considered for
maintenance treatment
25.03% 25.27% 26.20% 34.00% There has been marginal regression in the
condition of B class roads in South
Lanarkshire, however, their condition remains a
substantial 7.8% better than the Scottish
average. The modest regression noted is due
to many B class roads having been improved
in recent years, and investment increasingly
shifting towards more minor roads, which are in
48
106

Page 107

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
the worst condition hence priority.
ENV4d Percentage of C class
roads that should be
considered for
maintenance treatment
36.65% 37.67% 37.60% 33.60% There has been a marginal improvement in the
condition of C class roads in South
Lanarkshire, however, the score is 4% poorer
than the Scottish average.  The investment in
the treatment of the minor unclassified network
has had an impact on the C Class roads.
ENV4e Percentage of U
(unclassified) roads that
should be considered
for maintenance
treatment
32.31% 30.33% 30.50% 38.30% With unclassified roads making up a sizeable
proportion of the road network in South
Lanarkshire, it is noted that there has been a
marginal decline in the condition of network,
however, the network remains 7.8% better than
the Scottish average.
ENV5a Cost of trading
standards per 1,000
population
£3,523.00 £3,061.00 £2,836.00 £5,857.00 The cost of Trading Standards per 1,000
population decreased in 2020-21 and remained
well below the Scottish average.
During the year the service was disrupted, and
elements suspended due to Covid-19 and
therefore some costs were reduced from
previous years. Trading Standards were
involved in enforcing the new Covid-19 health
protection legislation during 2020-21.
ENV5b Cost of environmental
health per 1,000
population
£10,587.00 £11,119.00 £12,228.00 £12,606.00 The cost of environmental health per 1,000
population increased in 2020-21 but remained
below the Scottish average. The increase in
expenditure arose from filling vacancies, and
additional funding was provided by Scottish
Government to enable the new enforcement
responsibilities for Covid-19 to be
49
107

Page 108

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
implemented.
Normal service delivery was disrupted and
suspended as Environmental Health provided
the regulatory response to the Covid-19
pandemic.
ENV6 The percentage of total
household waste arising
that is recycled
44.30% 46.37% 40.50% 42.00% The percentage of total household waste
arising that is recycled decreased in 2020-21
and is now below the Scottish Average. An
increase in the amount of residual waste
generated during the pandemic, higher
contamination rates and suspension of certain
services (such as closure of Household Waste
Recycling Centres) had a negative impact on
recycling rates. It is also worth noting that the
material collected in bulk uplifts had a higher
than normal quantity of non-recyclable waste
(more black bag waste than normal) which
meant that only 15% of the waste was
recyclable. All of these factors led a reduction
in the household recycling rate.
ENV7a Percentage of adults
satisfied with refuse
collection
79.83% 79.17% ------ ------ Satisfaction data is not available for inclusion
in the February publication of the LGBF. The
publication of the Scottish Household Survey
(SHS) satisfaction data is going to be later than
expected.
The council carries out its own snap surveys to
gauge satisfaction levels. During 2020-21, 86%
of respondents rated the overall quality of the
waste service as ‘Excellent’ or ‘Good’. This was
50
108

Page 109

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
down slightly from 89% in 2019-20, mainly due
to the impact of Covid-19. We suspended the
delivery of food bags, dog bags and recycling
bins between March 2020 and September
2021 (so we could reallocate all our resources
to kerbside bin collections). When these
services resumed, we were inundated with
requests, and this had a negative impact on
our ability to meet our committed timescales.
ENV7b Percentage of adults
satisfied with street
cleaning
67.00% 64.33% ------ ------ Data from The Scottish Household Survey is
not yet available for this year. The results of
these surveys are however based on
individuals’ views and perceptions, and many
people are perhaps unaware of the full extent
of the work and service that we provide. For
instance, we maintain over 4,000 litter bins
throughout South Lanarkshire, and have one of
the largest fleet of mechanical sweepers out of
all the Scottish local authorities, which we
require to ensure that the leaves, litter, detritus
and road salt are kept off our road network.
Whilst our LEAMs street cleanliness score is
slightly down for 2020-21, we are still above
the Scottish average. Consideration should be
given to the fact that since March 2020, we
have had to introduce a more fluid service to
protect our staff who have been working at the
front line throughout the pandemic to ensure
that our streets remain clean and tidy, bins are
51
109

Page 110

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
emptied and fly tipping is removed.
It should also be noted that Street Cleansing
were finalists for 2021 APSE awards for the
whole of the UK in the category of “Best
performer in Street Cleansing”.
Financial Sustainability FINSUS1 Total useable reserves
as a % of council annual
budgeted revenue )
16.25% 13.29% 18.33% 23.60% The Council has seen an increase in the
percentage mainly due to the increase in
reserves as a result of the Loans Fund Review
and also the carry forward of COVID funding at
the end of 20/21.
This increase is in line with the Scottish
average which also increased by approx. 7%.
The important factor to consider is the purpose
and use of reserves, and the fact is that the
council is clear on what reserves we have, and
the purpose of them. The carrying forward of
covid funding will affect the figures as is
suggested in the narrative and will be a main
part of the reason for our increased level of
reserves.  The key factor is that the reserves
are sufficient.
FINSUS2 Uncommitted General
Fund Balance as a % of
council annual budgeted
net revenue
5.17% 1.67% 1.64% 3.52% The value of the Council’s Uncommitted
General Fund balance has not changed from
2019/20.  The Council's budget has increased,
therefore resulting in a minor decrease in the
percentage.
This is very much an arithmetic impact.  Our
uncommitted balance hasn’t changed, but
52
110

Page 111

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
would argue the budget will, due to funding for
specific purposes.  We and our auditors agree
that the level of uncommitted reserve is
sufficient.
FINSUS3 Ratio of Financing Costs
to Net Revenue Stream-
General Fund
8.25 7.76 5.32 6.24 The Council is within 0.9% of the Scottish
average.  It is also moving in the same
direction as the Scottish average, which also
showed a reduction in percentage terms.
This is the product of strategic, sustained
capital investment across a twenty year period
in schools and roads.
FINSUS4 Ratio of Financing Costs
to Net Revenue Stream-
Housing Revenue
Account
16.77 16.83 16.31 22.91 There is a minor reduction in percentage terms
and it is still lower than the Scottish average.
FINSUS5 Actual outturn as a
percentage of budgeted
expenditure
99.81% 99.59% 100.00% 97.44% The outturn reflects that the council reported a
breakeven position after all transfers to
reserves.  The position is consistently between
99 and 100% across years, but movement in
other councils' figures may result in a change
to our ranking going forward.
Housing Services HSN1b Gross rent arrears (all
tenants) as at 31 March,
as a percentage of rent
due for the reporting
year
6.78% 7.05% 8.26% 8.19% Performance in relation to rent collection and
arrears management continues to be good ,
with gross arrears only slightly behind the
Scottish local authority average in 2020-21.
Arrears have increased over the last three
financial years, reflective of the pressure on
rent collection due to wider economic position
and the Welfare Reform Agenda, and the
53
111

Page 112

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
implications of the COVID-19 pandemic. As
expected, the COVID-19 pandemic has had a
determinantal effect and this has been
consistent across local authorities.
The Council will continue to set affordable
rents and provide advice and assistance where
necessary to support our tenants and
customers through these difficult times. We
continue to utilise additional funding made
available by Scottish Government to further
support tenants.
HSN2 Percentage of rent due
in the year that was lost
due to voids
0.46% 0.49% 0.42% 1.38% Target achieved for 2020/21 and
continues to perform well above the Scottish
average.
HSN3 Percentage of dwellings
meeting Scottish
Housing Standards
92.46% 93.22% 93.50% 90.26% Current performance is ahead of the
Scottish average and energy efficiency
performance continued to increase in 2020-21.
Programme will continue during 2021-22 and
where failures occur as a result of tenant
refusals, these will be addressed when a
property becomes empty or where there is a
change in the tenant's circumstances.
HSN4b Average number of days
taken to complete non
emergency repairs
14.32 days 14.19 days 13.07 days 7.28 days A slight improvement has been recorded
and although we remain higher than the
Scottish average, this reflects the approach
which the council takes to carrying out these
repairs.
Improvement activity within the repairs service
54
112

Page 113

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
continued in 2021-22 to support the reduction
of the average time taken, although the
council's focus continues to be on quality
rather than speed of service.
This is policy based and reflects the approach
the council takes to carrying out these repairs -
by appointment made to suit the tenant.
HSN5 Percentage of council
dwellings that are
energy efficient
91.10% 93.39% 93.88% 86.35% Current performance is ahead of the Scottish
average and energy efficiency performance
continued to increase in 2020-21. Programme
will continue during 2021-22 and where failures
occur as a result of tenant refusals, these will
be addressed when a property becomes empty
or where there is a change in the tenant's
circumstances.
Social Work Services SW 1 Home Care costs per
hour for people aged 65
or over
£20.75 £23.47 £24.85 £27.65 Home care costs per hour have increased in
part  due to Living Wage increases. The
Scottish average position had a similar
increase from 2019-20 to 2020-21.  Our
ranking improved from 12 to 10.
Although the figures represent a positive
financial outcome for the Council, it does
present risks to the wider Care at Home sector
within South Lanarkshire. Our Commissioned
rates for Care at Home are less than the
national average and compare less favourably
with neighbouring authorities. This has the
potential to impact on South Lanarkshire’s
55
113

Page 114

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ability to attract recruits into the sector, grow
the external market and meet continuing
demands for services. Recent uplifts from the
Scottish Government represent a positive
move forward. However, do not address
differentials between authorities. Discussions
are ongoing to explore ways to bridge future
gaps.
SW 2 Self Directed Support
(Direct payments and
managed personalised
budgets) spend on
adults 18+ as a
percentage of total
social work spend on
adults 18+
3.69% 4.24% 3.93% 8.17% This indicator highlights only the increase in
social work spend allocated via Direct
Payments, Personalised Managed Budgets
and Individual Service Fund (ISF) - options 1
and 2.  It does not recognise local authority
managed services - option 3, which provides a
legitimate choice for individuals, or a default
position in the legislation for individuals who do
not wish to exercise their right to choose.
In terms of our LGBF family group, we have
been consistently in the middle of the table
over the past few years.  The 2020/21 data
indicates that since 2010/11, the proportion of
total social work spend in South Lanarkshire
allocated via DP and PMB / ISF has grown
steadily from 1.77% to 3.93%.  There has been
a slight dip in the percentage from 4.24% in
2019-20 and this could be attributed to the
non-availability generally of care services
which is impacting on the choices now being
made. The market is in a difficult position
56
114

Page 115

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
nationally as capacity is dwindling due to staff
turnover and COVID, also the ability to recruit
and retain personal assistants via option 1 has
been impacted as a result of the pandemic.
It is recognised that many of our care at home
recipients within South Lanarkshire did not go
through the same SDS process as others and
did not exercise choice. This has been rectified
with the introduction of the revised Living the
Life You Choose assessment which is now the
only assessment tool available for staff. This
should increase the total numbers going
through the SDS process but won’t necessarily
change the uptake of direct payments or ISF,
as historically service user engagement with
Care at Home service users indicates the
majority of people are content with the local
authority managing the care arrangements on
their behalf.
In terms of the national picture, there has been
reported growth across Scotland in the
percentage spend on options 1 and 2.  As
previously reported Glasgow and North
Lanarkshire are outliers and account for a
significant proportion of this growth from 1.58%
in 2010/11 to 8.17% in 2020/21.  North
Lanarkshire had already embarked on a
personalisation model prior to the introduction
57
115

Page 116

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
of self-directed support, converting all their
spend on learning disability and mental health
to managed personal budgets, and closing
almost all inhouse day centre provision.  This
created a position where all their spend in
these areas was counted as option 1 or 2.
Glasgow’s position is broadly similar where
option 2 is in place in response to a significant
budget reduction for the social work service,
which also saw the closure of day care centres.
Within South Lanarkshire, we continue to work
to our action plan to deliver critical changes to
our processes and procedures.  Resource
constraints remain challenging and the
ongoing transformation agenda aims to create
capacity from existing models of service.  In
terms of the processes for option 2, work is
underway to develop staff confidence in
explaining each of the options and how these
work in practice, whilst direct payments are
also well established.  From a legal and
procurement point of view, there are people
exercising their choice of provider by selecting
those who are not on any existing council
framework or contract. The development of an
SDS team and a Commissioning and Quality
Assurance team will support the work to
address this and any inherent tensions in the
making of SDS choices.
58
116

Page 117

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
SW 3a Percentage of people
aged 65 and over with
long-term care needs
receiving personal care
at home
61.44% 62.00% 63.88% 61.71% Our performance remains consistent with
previous years with an increase of 1.88% from
2019-20 and an improved ranking from 16 to
14 represents performance above the Scottish
average. However, this indicator excludes
individuals waiting for a service which currently
accounts for approximately 3,350 hours each
week.
To maintain this improving performance we
need to retain a focus on moving resource to
Care at Home to meet demographic demand
and continue to implement the Council's
Prioritisation framework.
A number of service developments are
proposed following recent investment from the
Scottish Government. This combined with the
implementation of the redesign of Care at
Home service will significantly increase Home
Care capacity and capacity for the assessment
and review of service users.
SW 4b Percentage of adults
supported at home who
agree that their services
and support had an
impact in improving or
maintaining their quality
of life
------ 78.08% ------ ------ Data for this indicator is published biennially.
New figures will be available for 2021-22 and
will be updated in the 2021-22 LGBF
framework
SW 4c Percentage of adults ------ 84.22% ------ ------ Data for this indicator is published biennially.
59
117

Page 118

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
supported at home who
agree that they are
supported to live as
independently as
possible
New figures will be available for 2021-22 and
will be updated in the 2021-22 LGBF
framework
SW 4d Percentage of adults
supported at home who
agree that they had a
say in how their help,
care or support was
provided
------ 75.32% ------ ------ Data for this indicator is published biennially.
New figures will be available for 2021-22 and
will be updated in the 2021-22 LGBF
framework
SW 4e Percentage of carers
who feel supported to
continue in their caring
roles
------ 31.05% ------ ------ Data for this indicator is published biennially.
New figures will be available for 2021-22 and
will be updated in the 2021-22 LGBF
framework
SW 5 Residential cost per
week per resident for
people aged 65 or over
£440.00 £463.00 £533.00 £439.00 This measure relates to the average net cost to
the council.  South Lanarkshire currently has a
spend of £518 per week in comparison to a
Scottish average of £432.   We currently follow
Clackmannanshire and Fife within the LGBF
family group who spend £685 and £530
respectively.  The performance of each Council
is influenced by demographics and
contributions made by service users. The cost
of care also increases year on year with
changes to the national care home rate.
There are currently variable costs for care
homes across Scotland and it is anticipated
that the review of the National Care Home
60
118

Page 119

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Contract (NCHC), which has not been revised
since 2013, will standardise some of this.
Although it should be noted that the NCHC rate
will not equate to the net cost per resident, it
will impact only on local authority funded
residents who are in private and voluntary care
homes, whilst others will continue to pay a
proportion of their care home fees.
SW 6 Rate of readmissions to
hospital within 28 days
per 1,000 discharges
98.10 99.30 111.82 120.03 The rate of readmissions in South Lanarkshire
has increased from 99.3 to 111.82 per 1,000
since 2019-20. Despite this increase we
continue to perform better than the Scottish
Average.  Information on the 6 areas of the
Health and Social Care Delivery Plan are
monitored monthly and formally reported on a
quarterly basis to the Integrated Joint Board,
Performance Audit and Finance Sub
Committee and Social Work Committee.
SW 7 Proportion of care
services graded 'good'
or better in Care
Inspectorate Inspections
78.38% 79.92% 80.10% 82.50% This report focuses on the 2020-21 timeframe
which reflects the reduction in standard
inspection activity across the care sector
during the COVID pandemic.  It is anticipated
that service and thematic inspections will now
resume as restrictions ease, and preparation is
underway for a thematic multi-agency
inspection of our Adult Support and Protection
Services and the likely inspection of the Care
at Home Service within Clydesdale.    HM
Inspectorate of Prosecution in Scotland have
also published their terms of reference for a
61
119

Page 120

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2020/21
Service LGBF
Ref
Description
2018/19
Results
2019/20
Results
2020/21
Results
Result
Trend
Scotland
2020/21
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
joint review of diversion from prosecution in
2022 – the first part of this is a survey issued to
the Community Justice Partnership.  The
Resource has continued to implement
improvement actions from inspection and Care
Inspectorate throughout the pandemic with
regular reports to the Social Work Committee,
the Integration Joint Board and details included
within the Chief Social Work Officer Annual
Report.
SW 8 Number of days people
spend in hospital when
they are ready to be
discharged, per 1,000
population
1,024.66 1,155.69 544.22 484.28 Performance in this indicator has improved
significantly from 1,155.69 days in 2019-20 to
544.22 days in 2020-21. In line with this our
ranking has shifted from 27 to 20. A protocol
has been implemented to increase the number
of discharges that meet their planned
discharge dates and improvements are being
seen.
62
120

Page 121

Appendix 2 
Family Group Analysis graphs for indicators with results below the Scottish average 
FAMILY GROUPS 
For indicators relating to Children, Social Work and Housing services, councils with
similar levels of deprivation are grouped together. South Lanarkshire’s family group
for these indicators is: 
• Clackmannanshire 
• Dumfries & Galloway 
• Falkirk 
• Fife 
• Renfrewshire 
• South Ayrshire 
• South Lanarkshire 
• West Lothian 
For indicators relating to Environmental, Culture & Leisure, Economic Development,
Corporate and Property services, councils with similar urban/rural profiles are
grouped together. South Lanarkshire’s family group for these indicators is: 
• Angus 
• Clackmannanshire 
• East Renfrewshire 
• Inverclyde 
• Midlothian 
• Renfrewshire 
• South Lanarkshire 
• West Lothian 
3
121

Page 122

Cost per Attendance at Sports Facilities - C&L1- CER 
Cost per library visit - C&L2 – CER 
122

Page 123

Cost of museums per visit – C&L3 – CER 
(Note: Clackmannanshire, East Renfrewshire, Midlothian and Renfrewshire: N/A result. 
Huge range - Angus result £1,242.65 vs SLC result £13.14 vs W Lothian £0.23) 
Cost of parks and open spaces per 1,000 population – C&L4 – CER 
123

Page 124

Average time per business/ industry planning application (weeks) – ECON3 – CER 
Percentage of procurement spend on local enterprises – ECON4 – CER 
124

Page 125

No of business gateway start-ups per 10,000 population – ECON5 – CER 
Immediately available employment land as a % total land allocated for employment
purposes in the local development plan – ECON10 – CER 
125

Page 126

Net cost of waste collection per premise – ENV1a – CER 
Net cost of waste disposal per premise – EVN2a – CER 
126

Page 127

Net cost of street cleaning per 1,000 population – ENV3a – CER 
Percentage of C class roads that should be considered for maintenance treatment –
ENV4d – CER 
127

Page 128

The percentage of total household waste arising that is recycled – ENV6 – CER 
% of pupils from deprived areas gaining 5 or more awards at level 5 – CHN6 – EDR 
128

Page 129

% of pupils from deprived areas gaining 5 or more awards at level 6 – CHN7 - EDR 
% of funded early years provision which is graded good/better – CHN18 – EDR 
129

Page 130

School attendance rate – CHN19a – EDR 
School exclusion rates (per 1,000 looked after children) - CHN 20a - EDR 
130

Page 131

The percentage of the highest paid 5% employees who are women – CORP3b – FCR 
The gender pay gap – CORP3c – FCR 
131

Page 132

Sickness absence days per teacher – CORP6a – FCR 
Sickness absence days per employee (non-teacher) – CORP6b – FCR 
132

Page 133

Percentage of invoices sampled that were paid within 30 days – CORP8 – FCR 
Percentage of unemployed people assisted into work from council funded/operated
employability programmes – ECON1 – FCR 
133

Page 134

Proportion of people earning less than the living wage – ECON7 – FCR 
(Note – Clackmannanshire and Midlothian councils did not provide data) 
Claimant Count as % of working Age Population (New) – ECON12a – FCR 
134

Page 135

Claimant Count as % of 16-24 Population (New) – ECON12b – FCR 
Total useable reserves as a % of council annual budgeted revenue – FINSUS1 - FCR 
135

Page 136

Uncommitted General Fund Balance as a % of the council annual budgeted net Revenue -
FINSUS2 – FCR 
Percentage internal floor area of operational buildings in satisfactory condition – CORP-
ASSET2 – HTR 
136

Page 137

Gross rent arrears (all tenants) as at 31 March, as a percentage of rent due for the
reporting year – HSN1b – HTR 
Average number of days taken to complete non-emergency repairs – HSN4b – HTR 
137

Page 138

Percentage of children meeting developmental milestones CHN 17 SWR 
Self-Directed Support (Direct payments and managed personalised budgets) spend on
adults 18+ as a percentage of total social work spend on adults 18+ – SW2 – SWR 
138

Page 139

Residential cost per week per resident for people aged 65 or over – SW5 – SWR 
Proportion of care services graded 'good' or better in Care Inspectorate Inspections –
SW7 – SWR 
139

Page 140

Number of days people spend in hospital when they are ready to be discharged, per 1,000
population – SW8 – SWR 
140

Page 141

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 16 August 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Local Government Benchmarking Framework (LGBF)
Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 Provide the Performance and Review Scrutiny Forum with an update on
discussions regarding the Benchmarking Framework and its future use.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendation(s):-
[]
(1) that the engagement with the Local Government Improvement Service on
use of the LGBF, be noted;
(2) that the suite of indicators aligned with Council Plan outcomes as described
in section 5, be noted;
(3) that further work will be undertaken as described in section 6 to map LGBF
indicators to reporting routes which place them in an appropriate setting and
scrutiny context, be noted; and
(4) a report on the conclusion of this work be brought to a future meeting of the
Forum, be noted.
[1recs]
3. Background
3.1. In the course of 2021, the Council raised a number of concerns about the LGBF
with the Local Government Improvement Service (IS) and the LGBF Board. 
3.2. Following this dialogue, the Council agreed to work with the IS to develop a new
approach to reporting the LGBF. 
3.3. A report to the Forum on 26 October 2021 outlined the issues with the LGBF and
committed to bringing an update on progress back to the Forum for discussion. 
3.4. This report summarises the work undertaken so far and sets out further to develop
and refine a best practice approach to reporting and using the LGBF. 
4. LGBF Issues and Concerns
4.1. A number of issues with the LGBF have been raised over several years.  To recap,
these include:-  
4
141

Page 142

 Local policy decisions can impact on the LGBF results and interpretation of the
data.  This is particularly true for cost indicators in the LGBF suite, where lower
costs are generally equated with good performance.  In these instances, where
the Council has opted to invest resources (eg, in roads maintenance or in the
school estate), costs will appear higher than the Scottish average or for
comparable councils and performance may be assessed as ‘worse’.
 A number of satisfaction measures within the LGBF are derived from the
Scottish Household Survey (SHS).  There are important limitations to this data,
for example, the number sampled is very small relative to the population and
survey respondents are asked how satisfied they are with services even if they
have not used the service in question.  The Council’s own surveys of service
users invariably rate the services more highly than the SHS.
 The figures within the LGBF are the result of a wide range of service provision
models and data collection processes carried out in each of Scotland’s 32
councils.  While the LGBF endeavours to achieve high standards of
completeness and consistency, there are inevitably differences between
councils and between indicators in terms of what is counted and how it
translates into LGBF performance. 
4.2. These concerns have featured prominently over recent years when results have
been presented at the Forum.  The opportunity was taken in June 2021 to raise
these issues with the IS and the Chair of the LGBF Board. 
4.3. Following these discussions, it was agreed that the Council should work with the IS
to review how it uses the LGBF and in particular, to develop an approach to LGBF
reporting which will better reflect the Council’s priorities and support scrutiny of
progress in priority areas.  As noted above, these developments were reported to
the Forum on 26 October 2021. 
5. Defining a Strategic LGBF Reporting Set
5.1. In December 2021, the IS provided a bespoke analysis of LGBF indicators for the
Council, structured around the emerging key themes for the draft new Council Plan. 
5.2. The aim of this exercise was to begin looking at the LGBF indicators more
thematically and more strategically. Resources were asked to review the IS
analysis and in tandem with work on the new Council Plan, consider which LGBF
indicators added value and which would be the best candidates for inclusion in a
subset of indicators for future reporting. 
5.3. The result of this exercise is shown at appendix 1.  Against the 6 outcomes within
the new Council Plan, a draft suite of measures has now been identified which
draws upon indicators assessed by Resources as appropriate and useful.  Several
of these LGBF measures are already included within the Council Plan as
“measures of success”. 
5.4. The draft matrix at appendix 1 identifies 33 of the 95 LGBF indicators for inclusion
within the reporting arrangements for the Council Plan.  This is 33% of the current
LGBF suite. 
6. Towards a Best Practice Approach
6.1. Discussion with the IS has highlighted that although the question of how many or
which specific indicators are reported is significant, other considerations, such as
when and how they are reported, may be more important in getting the most out of
the LGBF.  
142

Page 143

6.2. In addition to the issues identified at 4.1 above, the way in which LGBF indicators
are reported can raise barriers to using the framework for effective scrutiny, enquiry
and learning:- 
 Presenting the LGBF as a standalone suite tends to encourage league-table
analysis and comparisons across councils or services which are not sufficiently
alike for meaningful debate.
 When the focus of reporting is on the LGBF suite as a whole and year-to-year
movements or standing relative to the Scottish average, the discussion lacks
appropriate context and loses depth and nuance.  In effect, individual indicators
are given undue prominence and context is imported into the LGBF reporting
rather than the LGBF reporting occurring in a more appropriate context.
 Reporting the LGBF alongside health warnings, reservations and other caveats,
can impair scrutiny by focusing attention on these difficulties instead of where
the suite is illuminating real issues as well as having the effect of undermining
confidence on the suite as a whole.
 As the LGBF grows larger and there are plans to extend it into new areas, the
idea that all indicators should be given equal weight and have an equal bearing
on a council’s performance is less tenable; the IS and the LGBF Board are keen
to move thinking away from this whole-framework approach. 
6.3. Taken together, these considerations suggest a best practice approach would place
an emphasis on looking at LGBF indicators in a more integrated, thematic way and
would encourage the consideration of LGBF measures within or alongside other
performance reporting.  This enables the LGBF to be seen in an appropriate
context and alongside or in the course of strategic decision-making and scrutiny. 
6.4. Following the logic of this approach, the strategic LGBF subset identified in section
5 above would form part of the reporting arrangements for the Council Plan and
would appear alongside other measures relevant to the achievement of the 6
outcomes. 
6.5. To complement the reporting of this strategic LGBF suite, additional work will be
undertaken to map the LGBF indicators across the Council’s reporting
arrangements to identify where LGBF might be included within other reporting
streams, where there is more context and other indicators.  The aim of this exercise
would be to find a “home” for the LGBF indicators in our routine reporting so that
they can be reported in the most suitable context and alongside other appropriate
information and narrative content. 
6.6. As part of this exercise, the Public Performance Reports (PPRs) on the Council’s
website will be reviewed to identify where LGBF indicators could usefully be
included.  The PPRs are updated annually and are provided as part of the Council’s
commitment to balanced and accessible performance reporting as required by Best
Value legislation.  This will enhance the visibility and relevance of the LGBF in our
public performance reporting. 
6.7. The conclusion of this work will position the Council to implement a well-considered,
robust and comprehensive approach to LGBF which sees the indicators embedded
across our reporting arrangements, with a strategic focus on those which are most
relevant to the priorities for the Council.  These arrangements will strengthen
opportunities to scrutinise the LGBF and enhance the role of the LGBF in the
Council’s public performance reporting.   
143

Page 144

6.8. Elected Members will continue to receive the annual LGBF report through the
Performance and Review Scrutiny Forum.  However, the implementation of the
approach described in this paper will offer more opportunities to scrutinise LGBF
within an appropriate context and in the course of strategic decision-making.  The
focus will be placed on those indicators which are most relevant to the Council’s
outcomes as set out in the Council Plan Connect, illustrated in the draft matrix
described in section 5 above. 
7. Next Steps and Recommendations
7.1. The Forum is asked to note the work undertaken with the IS to develop the
Council’s use of the LGBF. 
7.2. Further work will be undertaken with to:- 
 Refine and finalise the draft strategic indicator suite for use in conjunction with
the reporting of the new Council Plan; and
 Investigate routes by which LGBF indicators can be embedded into routine
reporting by mapping indicators to potential reporting routes. 
7.3. A further progress report will be brought to the Forum on conclusion of this work. 
8. Employee Implications
8.1. There are no direct employee implications. 
9. Financial Implications
9.1. There are no direct financial implications. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
11. Other Implications
11.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
21 July 2022 
Link(s) to Council Values
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving 
Previous References
• LGBF Update – 26 October 2021  
144

Page 145

List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)E-mail:  Tom.Little@southlanarkshire.gov.uk
145

Page 146

Appendix 1 
LGBF suite aligned to Connect Outcomes 
Communities and
Environment
Caring, connected,
sustainable
communities 
Education and
Learning
Inspiring learners,
transforming
learning,
strengthening
partnerships 
Health and
Wellbeing
People live the
healthiest lives
possible 
Children and Young
People
Our children and
young people thrive. 
Housing and Land
Good quality,
suitable and
sustainable places
to live 
Our Economy
Thriving business,
fair jobs and vibrant
town centres 
Delivering the Plan
and achieving Best
Value 
Refuse collection LAC Pupil
Attendance Rates
Balance of
Care
Child Poverty
Rates
Rent Arrears Superfast
broadband
% of income due
from Council Tax
received
Street Cleansing
Score
Literacy
Attainment Gap
Delayed
Discharges
Developmental
Milestones
Voids Town centre
vacancy rates
Total useable
reserves
Parks/Open Spaces
Satisfaction
Numeracy
Attainment Gap
Hospital
readmissions
LAC Placement
Stability
Repair time Youth
Unemployment
Actual outturn as a
% of budgeted
expenditure
Leisure Satisfaction % Pupils Gaining
5+ Awards at Level
5 (SIMD)
Home Care
Costs
Balance of Care
for LAC
Energy Efficiency % earning less
than the real
Living Wage 
Carbon Emissions % School Leavers
entering Positive
Destinations
Residential
Care Costs
LAC Costs
Community 
Roads Condition 
LAC Costs
Residential   
Indicators in bold are included within the Council Plan “measures of success”
146

Page 147

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 16 August 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Annual Performance Spotlights 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
• provide the Forum with a preview of the infographics for the Annual Performance
Spotlights (APSs) for 2021/2022. 
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendations:-
[recs]
(1) that the infographic content of the Annual Performance Spotlights, is noted;
and
(2) that the Annual Performance Spotlights will become live on the Council’s
website in September 2022, well ahead of the statutory deadline of 31 March
2023. 
3. Background
3.1. The Council’s first Annual Performance Report (APR) was prepared based on
2011/2012 information and represented part of the Council’s ongoing commitment to
continuous improvement in respect of its approach to Public Performance Reporting
(PPR). 
3.2. On 4 September 2018, the Forum considered a report which set out plans to review
the APR component of the Council’s PPR approach, in light of the continuing
evolution of the Accounts Commission’s expectations and taking into account
feedback from Audit Scotland on the APR, in particular.   
3.3. A new approach was developed which replaced the APR document with Annual
Performance Spotlights (APSs) – bite sized web content performance information
comprising a case study, selection of infographics and links to other related material
- one for each Connect objective plus the theme Delivering the Plan and achieving
Best Value. 
3.4. Following the refresh of the Council Plan Connect (approved by Executive
Committee on 25 March 2020), the overall structure was simplified by removing the
11 Objectives and the Best Value theme and replacing the 5 Ambitions with 4
Priorities. An Annual Performance Spotlight is presented for each of the Council’s
Priorities, comprising a case study, selection of infographics and links to other
material. 
5
147

Page 148

3.5. In addition, to supplement the 2021/2022 results, infographics have been created to
highlight the Council’s work in response to the Covid-19 pandemic. 
3.6. This report provides the Forum with an overview of the draft infographics content of
the APSs 2021/2022.   
4. Current Position
4.1. The APSs 2021/2022 infographics, as they will appear on the performance pages of
the Council’s website, are attached as Appendix 1. The Council’s Improvement Unit
has liaised closely with services across the Council to bring together the content of
the APSs. The focus, at all times, has been to ensure that the information included is
of interest to the public, balanced and readily accessible.  These are key
requirements of Public Performance Reporting, as set out by the Accounts
Commission. 
4.2. In line with the Council’s shift towards a digital first approach, the aim of the
spotlights is to provide performance information as content on the web. This will go
live on the performance pages of the Council’s website to allow residents and
stakeholders to browse the information electronically.   
4.3. The spotlights use infographics to present information about the Council’s
performance. The infographics show performance against certain measures for each
of the Council’s 4 strategic Priorities. In response to points made by the Accounts
Commission in the Best Value Assurance Report 2019 (BVAR), the following
improvements have been made:- 
 for each infographic, trend information is included with a clear indication whether
or not performance has improved and if the target has been met
 a link has been added directly below the infographic on the website to supporting
data, further reports or more detailed information 
4.4. In order to gather feedback which will help us to continue to improve our public
performance reporting material, the ‘Did you find?’ response box at the bottom of
each of the APS web pages is monitored. 
4.5. To complement the APSs, we will continue to prepare the suite of ‘public
performance reports’ which focus on key areas of Council business. Each report
includes a clear presentation of data; targets and narrative to introduce and explain
the performance indicators and results; comparisons; customer feedback;
satisfaction statistics and links or signposts to further relevant information. These
reports have been well-received in public testing and have attracted positive
feedback from Audit Scotland. 
Since they were first uploaded (at the end of March 2015), they have attracted
thousands of visitors to the performance pages of the website indicating that there is
an audience for the performance information, providing us with a platform on which
to report and highlight the work of the Council to the public. 
4.6.  The 2021/2022 Local Government Benchmarking Framework (LGBF) indicator
results are not due to be published by the Improvement Service until
January/February 2023, at the earliest. As these are included in the public
performance reports, the completion date for this part of our public performance
reporting will be the statutory deadline of 31 March 2023, allowing us time to analyse
the results. 
148

Page 149

5. Public Performance Reporting Assessment 
5.1.  The Accounts Commission (the Commission) has a statutory responsibility to define
the performance information that councils must publish for performance comparisons
and benchmarking purposes. This is closely linked with the Commission’s Best
Value audit responsibilities. 
5.2. Since 2008, the Commission has taken steps to develop a more flexible approach to
its statutory responsibility to define the performance information that councils must
publish. 
5.3. The 2015 Direction sets out a streamlined and more flexible set of performance
information for the 2016/2017 financial year and each year through to the financial
year ending March 2019. The Accounts Commission refreshed and published a new
direction in December 2018 for financial years 2019/2020 to 2021/2022, with a
further refresh of the Direction published in December 2021 (for reporting the results
for financial years 2022/2023 to 2024/2025). Any implications will be taken into
account in South Lanarkshire’s future PPR material. 
5.4. As noted at 3.2., 3.3. and 3.4. above, the APSs and the Council’s approach to Public
Performance Reporting generally continues to evolve in response to user feedback
and changing legislative requirements.  It is intended that the format of the APSs will
continue to be reviewed to ensure the documents keep pace with public expectations
and also with Audit Scotland’s requirements in respect of Public Performance
Reporting, continuous improvement and Best Value.  The APSs will continue to be
complemented by a full suite of performance information on the Council’s website. 
6. Next Steps
6.1. The Forum is asked to note the infographic content of the APSs for 2020/2021. 
6.2. Looking forward, council officers will review the presentation of the Annual
Performance Spotlights and Public Performance Reporting generally, to take
account of changes arising from the new Council Plan 2022 to 2027 as well as
implications arising from the Direction 2021. 
7. Employee Implications
7.1. There are no employee implications relating to this report. 
8. Financial Implications
8.1. There are no financial implications relating to this report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no Climate Change, Sustainability and Environmental Implications relating
to this report. 
10. Other Implications
10.1. The work undertaken in the preparation of the APSs assists in providing assurance
that the Council is responding to its Best Value obligations in terms of continuous
improvement and public performance reporting. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
149

Page 150

11.2. Consultation took place with Resources on the plans to update our PPR material as
well as the content of the APSs. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
12 July 2022 
Link(s) to Council Values/Priorities/Outcomes
• Ambitious, self-aware and improving
• Accountable, effective, efficient and transparent
Previous References
• Report to PRSF (17 August 2021) Annual Performance Spotlights 2020-21 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904 (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk 
150

Page 151

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
1 Improve health, care and wellbeing
Housing suitable for older people
Total number of amenity houses in our stock
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Note: some 2021-22 results were impacted due to the Covid-19 crisis
2020-21
820
Carers accessing support
2021-22
938
2020-21
4,917
2021-22
5,445
Local authority and private
Welfare guardianship visits:
Target met ✔ Performance improving ✔
Target – 90%
9595%%9494%%
% Completed on time
2020-21 2021-22
ConnectPriority:
Target – increase by 10%
Target met ✔ Performance improving ✔
Target – upgrade all available
suitable properties
Target met ✔ Performance improving ✔
Energy Efficiency Standard for
Social Housing (EESSH)
% of council dwellings meeting the Energy
Efficiency Standard for Social Housing
Target met ✔  Performance improving ✔
93.4%Target
93.9%
2020-21
98.6%
2021-22
SLC 
print proof
5
151

Page 152

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
Getting it right for children and young people2
Children being looked after in a
community setting
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Target met ✔ Performance improving ✘
Target – more than 90%
2020-21
92%
2021-22
90%
ConnectPriority:
Pupils entering positive
destinations
Target met ✔ Performance improving ✔
Target – 95.6%
2020-21
94.8%
2021-22
96.2%
School leavers achieving 5 or
more awards at Level 5
Target – improve on previous year
2020-21
68.8%
Children and young people in 
Early Learning and Childcare
Target – increase numbers by
adding 2 establishments and a
nursery class
2021-22
72.6%
Target met ✔ Performance improving ✔ Target met ✔ Performance improving ✔
Note: some 2021-22 results were impacted due to the Covid-19 crisis
2021-22
8,026
2020-21
7,792
SLC 
print proof
152

Page 153

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
ConnectPriority:
Promote sustainable and inclusive economic growth 
and tackle disadvantage3
Business support interventions 
by Economic Development 
(grants, loans or advice)
Target met ✔  Performance improving ✘
Unemployed people gaining
sustainable employment
Target met ✔  Performance improving ✔
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Percentage of our road network
that should be considered for
maintenance treatment 
(Road Condition Index)
Target – less than 30.6%
Target met ✔Performance improving ✔
2020-21
410
2021-22
1,146
Target met ✔  Performance improving ✔
30.6%
2020-21
29.7%
2021-22
Unemployed people supported
via council operated
employability programmes
Target – 1,000
2020-21
1,348
2021-22
1,934
,
Target – 400
Note: some 2021-22 results were impacted due to the Covid-19 crisis
Target – 1,500
2020-21
3,075
2021-22
2,679
£ ?
SLC 
print proof
153

Page 154

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
Ensure communities are safe, strong and sustainable4
Percentage of properties with
Superfast Broadband more than
30Mbps
Target met ✔ Performance improving ✔ Target met ✔  Performance improving ✔
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Housing repairs 
completed right first time
Target met ✔ Performance maintained
Additional affordable 
homes delivered
Target met: on track Performance improving ✔
2020-21
99%2020-21
197
2021-22
415
Target
90%
2021-22
99%
Percentage of household waste
sent to landfill
Target – less than 15%
ConnectPriority:
Target – provide 1,000 homes 
by end of 2022
Note: some 2021-22 results were impacted due to the Covid-19 crisis
Target – more than 96.6%
2020-21
96.6%
2021-22
97.0%
2020
9.71%
2021
8.66%
SLC 
print proof
154

Page 155

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
Covid response
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Wellbeing and assistance
52,822
calls to/from the Community
Wellbeing Helpline in 2021-22
community
responses 
to the request for
assistance
1,750
1,880
food packs
supplied directly
to vulnerable
groups
291,984
meals distributed
directly to individuals 
and families or to
food organisations 
in communities
565
households 
referred 
to local 
foodbanks
SLC 
print proof
155

Page 156

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Businesses helped and grants issued
4,256
to taxi driver/operators under the 
2021-22 scheme, totalling 
£4.779 million
51,014
££
££
Free School Meals Payments 
(School Holiday and 
Self-Isolation) totalling 
£1.590 million
28,549
Scottish Child 
Payments 
to low income 
households totalling 
£4.278 million
Covid response
payments
DR1 VER
Self-Isolation Support
Grants (SISG) payments
of £500 totalling 
£4.811 million
9,62211,307
Crisis and Community
Care Grants 
from the Scottish Welfare
Fund totalling 
£3.342 million
34,141
Low Income Pandemic
Payments of £130 
to low income 
households totalling 
£4.438 million
££
££££ ££
SLC 
print proof
156

Page 157

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Businesses helped and grants issued
Assisted 232 businesses with
Scottish Government funded
discretionary grants of
3 grants made under the
Covid-19 Nightclub Closure
Fund totalling
108 business grants made
under the Covid-19 Table
Service Fund totalling
17 grants made
under the Covid-19
Ventilation Fund
totalling
£2.7 million
£135,000
£290,000
£22,185 
Covid response
business grants made
under the Covid-19
December/January Hospitality
Fund totalling £2,178,900
351
72 business grants made under
the Covid-19 Hospitality and
Leisure Fund totalling £160,650
SLC 
print proof
157

Page 158

South Lanarkshire Council Plan
Produced for Finance and Corporate Resources by Communications and Strategy. 063234/Jun22
How we did in 2021-22
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Support for Education
were successfully
delivered by 
the council 
during the summer
holidays, nearly
800 children 
attended
including 151 
with additional 
support needs
14
Sensational Summer
Sessions clubs
were also
distributed to
families who 
had little or no
internet access
570
mobile wifi
(Mifi) devices
Over
pre-loved items
were donated 
to the 2021 
winter clothing
campaign led 
by Education
More than
1,100
Covid response
were purchased by the council and
distributed to pupils to support their
learning and keep them connected
during lockdown
Over
5,800
Chromebook
devices
SLC 
print proof
158