Agenda Document Pack - Performance and Review Scrutiny Forum - 01/04/2025

South Lanarkshire Council · 1 April 2025
Back to Performance and Review Scrutiny Forum — 1 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 24 March 2025 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 01 April 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers, Maureen
Devlin, Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
4 February 2025 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Consideration 
3 Local Government Benchmarking Framework - 2023/2024 Results and
Action Plan
Report dated 24 February 2025 by the Chief Executive. (Copy attached) 
7 - 52 
4 Statutory Performance Information Direction 2024
Report dated 4 March 2025 by the Chief Executive.  (Copy attached) 
53 - 64 
5 Accounts Commission's New Approach to the Audit of Best Value –
Comhairle nan Eilean Siar, Fife, East Renfrewshire
Report dated 5 March 2025 by the Chief Executive.  (Copy attached) 
65 - 72 
6 Transformational Reviews - Update
Report dated 4 March 2025 by the Executive Director (Finance and Corporate
Resources). (Copy attached) 
73 - 82 
7 Third Sector Partnership Review
Report dated 12 March 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
83 - 92 
Urgent Business 
8 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370 089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 4 February 2025 
Chair:
Councillor Joe Fagan 
Councillors Present:
Councillor John Anderson, Councillor Maureen Chalmers, Councillor Gerry Convery (Depute),
Councillor Maureen Devlin, Councillor Richard Lockhart, Councillor Katy Loudon, Councillor Davie
McLachlan, Councillor Kirsten Robb 
Councillor’s Apology:
Councillor John Ross 
Attending:
Chief Executive’s Service
T Little, Head of Communications and Strategy; L Marshall, Finance Adviser; N Reid, Improvement
and Community Planning Manager
Finance and Corporate Resources
J Taylor, Executive Director; A Norris, Administration Assistant; T Slater, Administration Adviser
Housing and Technical Resources
S Gibson, Executive Director 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Performance and Review Scrutiny Forum held on 19
November 2024 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Audit Scotland Report: ‘Delivering for the future – why leadership matters’ 
A report dated 5 December 2024 by the Chief Executive was submitted providing a summary of
the Audit Scotland report ‘Delivering for the future – why leadership matters’ published in July
2024 on behalf of the Accounts Commission. 
The audit of Best Value was now integrated into the annual financial audit and, as part of this,
auditors were asked to report on a specific thematic issue chosen each year by the Accounts
Commission, recognising the risks and challenges councils faced.  This theme was ‘Leadership
of the development of new strategic priorities’. 
Information was provided on the findings of the Accounts Commission following its analysis, and
improvement actions identified by auditors.  Overall, auditors had concluded that councils had
set a clear vision and priorities following the local government elections and that ensuring they
had the detailed plans to support delivery, effective collaborative working relationships to enable
tough decisions and clear performance reporting to support effective scrutiny was key to
ensuring the sector could respond to the challenges ahead.
2
3

Page 4

South Lanarkshire Council’s position for each of the actions was outlined in the report. 
The Forum decided: that the key findings, as outlined in the report, be noted. 
4 Accounts Commission’s New Approach to the Audit of Best Value – City of
Edinburgh, Clackmannanshire and Scottish Borders Councils 
A report dated 7 January 2025 by the Chief Executive was submitted on the key messages and
recommendations from recent reports published under the Accounts Commission’s new
approach to auditing Best Value. 
Towards the end of 2023, the Accounts Commission introduced a new approach to the Audit of
Best Value to replace the Best Value Assurance Report (BVAR) arrangements which had run
from 2018 to 2023. 
The approach consisted of brief Controller of Audit (CoA) reports accompanied by, and
reflecting on, published annual audit reports.  These CoA reports were considered by the
Commission in public and reported publicly. 
Information was provided on the findings and key messages from the recent CoA reports on the
following 3 councils:- 
 City of Edinburgh Council
 Clackmannanshire Council
 Scottish Borders Council 
The Forum decided: that the report be noted. 
5 Transformational Reviews – Update 
A report dated 7 January 2025 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the Transformational Reviews that were part of the
Council’s Transformational Change Programme for the year 2025/2026 and beyond.   
At its meeting on 26 June 2024, the Council’s Executive Committee noted the Transformational
Change Programme that was required to drive continuous improvement and efficiencies, and
link into the Budget Strategy over the next 3 years. 
Updates had been provided to previous meetings of the Forum.  This report provided a further
update and included cross-cutting reviews and Resource specific transformational reviews, to
identify savings in the year 2026/2027 and beyond. 
Information was provided on the following Transformational Reviews:- 
 Charging
 Procurement
 Overtime
 Organisational and Management Structure
 Loans Fund
 Fleet
 Digital Transformation
 Customer Engagement
 Property
 Depot Rationalisation
4

Page 5

 Third Sector Review
 Factoring
 In-house and procured services 
A Terms of Reference for the review of the Factoring Service was attached as Appendix 1 to the
report. 
The Executive Director (Finance and Corporate Resources) responded to a member’s question
in relation to the comparative costs between the use of electric and more conventional vehicles,
advising that it was a balanced position and the Council had obligations around moving to
electric vehicles. 
The Forum decided: that the update on Transformational Reviews be noted. 
[Reference: Minutes of 19 November 2024 (Paragraph 6) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 9)] 
6 Transformational Reviews – Forward Reporting Programme 
A report dated 10 January 2025 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the forward reporting programme of Transformational
Reviews. 
As part of the ongoing Transformational Change Programme for the year 2025/2026, a list of
items proposed for consideration at subsequent meetings of this Forum had been prepared. 
The outline forward programme to 25 November 2025 was attached as Appendix 1 to the report. 
In response to a member’s request, the Executive Director (Finance and Corporate Resources)
agreed to take forward the request for a review of grass cutting, grounds and weed killing for
next year’s budget setting process, highlighting that timescales would need to be checked to
ensure this was achievable within the timeframe required. 
The Forum decided: that the outline forward programme to 25 November 2025
be noted. 
7 Urgent Business 
There were no items of urgent business. 
5

Page 6

6

Page 7

Report
Agenda Item 
To: Performance and Review Scrutiny Forum
Date: 1 April 2025
Prepared by: Chief Executive 
Subject: Local Government Benchmarking Framework -
2023/2024 Results and Action Plan
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide the Forum with the Local Government Benchmarking Framework
(LGBF) results for 2023/2024
 provide the Forum with explanatory narrative for the suite of indicators,
including the proposed actions, where appropriate, being taken to address
those LGBF indicators where the results are declining and/or are below the
Scottish average
 provide a family group analysis of those LGBF indicators where South
Lanarkshire Council’s result is below the Scottish average 
2. Recommendations
2.1. The Forum is asked to approve the following recommendations:- 
(1) that the importance of viewing LGBF measures in the local context, as
detailed in paragraph 4 of the report, be noted; 
(2) that the results, narrative, actions and family group analysis included,
following the scrutiny of the 2023/2024 results, be noted; and
(3) that the arrangements for the publication of South Lanarkshire Council’s
results, in accordance with statutory requirements, be noted.
3. Background
3.1. The core purpose of the LGBF is to make comparisons on spend/cost, performance
and customer satisfaction results over several years and also between similar
councils. It comprises a suite of performance indicators, collated under the following
service headings:- 
 Children’s Services
 Corporate Services (ie support services)
 Adult Social Care
 Culture and Leisure Services
 Environmental Services
 Housing Services
 Corporate Assets
 Economic Development 
 Climate Change 
 Financial Sustainability 
3
7

Page 8

3.2. These headings represent approximately 70% of local authority spend. 
3.3. Publication of the LGBF results is a statutory requirement set out by the Accounts
Commission in the Direction to local authorities as required by the Local
Government Act 1992. It is seen as a key part of councils’ commitment to Best
Value, public performance reporting (PPR) and continuous improvement. 
3.4. This report presents the 2023/2024 LGBF results (on a Service by Service basis)
and sets out commentary and improvement actions against those indicators. Of
particular interest in terms of continuous improvement are those indicators which
are declining and/or falling below the Scottish average.  The steps and actions
identified in the report will not necessarily show immediate improvements - many
are long term plans. 
4. Interpreting the LGBF Results: Limitations and Cautions
4.1. Although the LGBF results are available for all councils in Scotland – and therefore
can be used to construct council league tables – the Local Government
Improvement Service cautions against this approach, emphasising that the purpose
of the data is to act as a ‘can-opener’ for discussions about performance and
improvement in the context of specific services, taking into account geography,
demographics and local council priorities. 
4.2. Within this report, South Lanarkshire’s performance trend for the past 3 years is
provided, together with the most recent year’s performance relative to the Scottish
average.  As with the LGBF as a whole, these summary figures are intended to
frame a closer examination of the underlying data and context for specific
indicators. For this reason, it is necessary to pay close attention to the narrative
against each indicator (provided in Appendix 1) when forming a judgement about
what the performance means in a South Lanarkshire context. 
4.3. All statistics require, for correct interpretation, a knowledge of potential limitations. 
In particular, the following specific points should be borne in mind when reviewing
the LGBF results: 
 Local policy decisions can impact on the LGBF results and interpretation of the
data.  This is particularly true for cost indicators in the LGBF suite, where lower
costs are generally equated with good performance.  In these instances,
where the Council has opted to invest resources (for example in roads
maintenance or in the school estate), costs will appear higher than the Scottish
average or for comparable councils, and performance may be assessed as
‘worse’.
 A number of satisfaction measures within the LGBF are derived from the
Scottish Household Survey (SHS).  There are important limitations to this data
– which the Council has highlighted for several years now.  First, the number
sampled is very small relative to the population – in 2019, interviews were
carried out with 423 adults in South Lanarkshire, equating to less than 0.2% of
the adult population. Second, survey respondents are asked how satisfied they
are with services even if they have not used the service in question.  Third, for
these indicators, the Council conducts its own surveys of service users so that
it can closely monitor and respond to user experiences.  These surveys – of
people who have used the services – invariably rate the services more highly
than the SHS. (the results of the SHS telephone survey are not directly
comparable to SHS results for previous years. This is due to a reduced sample
size and a change in methodology due to the Covid-19 pandemic.)
8

Page 9

 The figures within the LGBF are the result of a wide range of service provision
models and data collection processes carried out in each of Scotland’s 32
councils.  While the LGBF endeavours to achieve high standards of
completeness and consistency, there are inevitably differences between
councils and between indicators in terms of what is counted and how it
translates into LGBF performance. 
4.4. These points are not intended to undermine the LGBF results.  Rather they serve to
emphasise the importance of looking individually at each service and each indicator
to understand the local drivers and determinants of performance. 
4.5. The Improvement Service published a new Guidance document to assist Elected
Members in Understanding and using the LGBF to help promote a culture of driving
improvement. 
5. Results and Key Messages
5.1. The report attached as Appendix 1 summarises the recent results for South
Lanarkshire Council, indicating whether performance in 2023/2024 has improved
(↑) or declined (↓) compared with 2022/2023 results, and if performance is better
() or worse (X) than the Scottish average in 2023/2024. It also includes
explanatory narrative for the movements in performance between 2022/2023 and
2023/2024. 
5.2. The table below summarises South Lanarkshire Council’s performance:   
Table 1 – Summary of performance of LGBF Results (as at 6 Feb 2025) 
KEY:
Number (%) of indicators
2021/22 2022/23 2023/24
South Lanarkshire performance   
↑ improving performance in SLC 39 (39%) 53 (52%) 41 (40%)
↓ declining performance in SLC 53 (54%) 36 (35%) 34 (33%)
↔ No change in performance in SLC 3 (3%)  4 (4%)   5  (5%)
--- Results/trends not available  4 (4%)  9 (9%) 22 (22%)
Comparison with Scottish average   
✓ SLC results better than Scottish average 50 (51%) 51 (50%) 44 (43%)
X SLC results worse than Scottish average 43 (43%) 40 (39%) 34 (33%)
↔ SLC results same as Scottish average 2 (2%)   2 (2%)   2  (2%)
-- Results not available  4 (4%)   9 (9%) 22 (22%)
2021/22 updates results as at 29 Nov 2023
2022/23 results as at August 2024 update
2023/24 results as at 08 January 2025 (06.02.25) 
5.3. Across the 102 indicators in the 2023/2024 suite, South Lanarkshire Council’s
performance improved against 41 (40%) indicators, remained the same against 5
(5%) indicators, and declined for 34 (33%) indicators.  There are 22 (22%)
indicators for which the results or trend information is not yet available for
2023/2024, including tackling climate change, looked after children, educational
attainment and attendance/exclusions. It is hoped that these results will be available
when the 2023/2024 data is refreshed over the coming months. 
9

Page 10

5.4. In terms of South Lanarkshire’s figures relative to the Scottish results, performance
was better than the Scottish average for 44 (43%) indicators and was worse than
the average for 34 (33%) indicators.  There are 22 (22%) indicators for which the
2023/2024 results are not yet available. 
5.5. Following an Audit Scotland recommendation, the Forum (at their meeting on 26
November 2019) agreed to introduce a family group analysis in the annual reporting
of the Council’s LGBF results.  The family group analysis focuses on those
indicators where the Council is performing worse than the Scottish average. Based
on the 2023/2024 results, this relates to 34 (33%) indicators. This analysis is
attached at Appendix 2. 
6. Publication of the Data
6.1. The 2023/2024 data has been shared on the Local Government Improvement
Service interactive LGBF Dashboard - Explore the data. The Local Government
Improvement Service is due to publish their national overview report in March/April
2025, which provides a high-level analysis of performance both during 2023/2024
and over the longer term. It also sets out the key messages, trends and results from
across Scotland as a whole and the challenges facing councils in the context of
current funding pressures, growing demand and the cost of living crisis. 
6.2. At a local level each council is required to publish its own results at the same time
as the official publication by the Local Government Improvement Service. As in
previous years the LGBF results information for South Lanarkshire Council will be
uploaded on to the Council’s website, together with contextual information about
and explaining the indicators. In addition South Lanarkshire’s LGBF Dashboard will
be updated for the 2023/2024 results and commentaries. 
7. Next Steps 
7.1. The actions identified in the comments column in Appendix 1 will be taken forward.   
7.2. As noted at 6.1 above, these results are to be considered final, however a refresh of
the data is scheduled over the coming months following completion of the Scottish
Government final validation process on the financial data, and to allow inclusion of
the as yet unavailable results. An updated 2023/2024 results report will be prepared
in 6 months’ time, and following approval, will be uploaded onto the Council’s
website. A similar update will be made at this time to South Lanarkshire’s LGBF
Dashboard. 
7.3. The Local Government Improvement Service organise annual benchmarking
events, in which colleagues from specific services representing all local authorities
are invited to attend, to come together to learn and share good practice for their
particular area of operation. The Local Government Improvement Service align
these events with existing networks/forum wherever possible, minimising
duplication of discussions and bringing together relevant expertise. Following a
break due to the Covid crisis in 2020, these events resumed via Teams during
2021. This has proved to be a popular move away from the in person events with
more interested ‘performance’ officers able to attend from across Scotland. In South
Lanarkshire Council where officers were unable to attend, learning materials from
the events can be accessed on the Knowledge Hub. 
8. Employee Implications
8.1. There are no employee implications.  
10

Page 11

9. Financial Implications
9.1. There are no direct financial implications arising from this report. To further the work
of the Local Government Improvement Service in relation to the LGBF, each
Scottish local authority is requested to make a £3,783 annual contribution for the
three year period: 2024/2025 to 2026/2027. This is to be met from within existing
budgets. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
11. Other Implications
11.1. There are no risk or other implications associated with the content of this report. 
12. Integrated Impact Assessment and Consultation Requirements
12.1.   This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
12.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
24 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 None 
List of Background Papers
 LGBF results 2023/2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tom Little, Head of Communications and Strategy
Extension: 845 4904 (Tel: 01698 454904)
Email: tom.little@southlanarkshire.gov.uk 
11

Page 12

12

Page 13

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Children's Services CHN01 Cost per primary school
pupil
£6,589.00 £7,364.00 £7,363.00 £7,183.00 The cost per primary school pupil has remained nearly the same
as in 2023/24, staying below the Scotland average and aligning
with the family group median. Cost per pupil focuses solely on
financial expenditure and does not account for the quality of
education or pupil outcomes in attainment and achievement: see
results for indicators below – CHN10,CHN12a, CHN13, CHN14.
South Lanarkshire Council’s (SLC) expenditure is strategically
aimed at ensuring that our investment in education supports the
delivery of high-quality learning experiences and environments
for all pupils across South Lanarkshire at every educational level.
CHN02 Cost per secondary
school pupil
£8,230.00 £8,755.00 £8,799.00 £8,936.00 The cost per secondary school pupil in South Lanarkshire has
increased, aligning with the family group median but remaining
below the Scottish average. This rise is due to several factors,
including ongoing investment in the secondary school estate,
costs related to our PPP contract commitments, teachers’
salaries and pay awards, and council investments in staffing to
support the wellbeing and digital inclusion of children and young
people.
Cost per pupil focuses solely on financial expenditure and does
not account for the quality of education or pupil outcomes in
attainment and achievement: see results for indicators below –
CHN10,CHN12a, CHN13, CHN14. South Lanarkshire Council’s
(SLC) expenditure is strategically aimed at ensuring that our
investment in education supports the delivery of high-quality
learning experiences and environments for all pupils across
South Lanarkshire at every educational level.
CHN03 Cost per pre-school
education place
£10,595.00 £11,177.00 £11,315.00 £11,630.00 The cost per pre-school education place has increased due, in
part, to salaries and pay awards. The result remains below the
Scottish average.
CHN04 Percentage of pupils
gaining 5+ awards at
level 5
71.0% 70.0% ------ ------
CHN05 Percentage of pupils
gaining 5 or more
awards at level 6
41.0% 40.0% ------ ------
CHN06 Percentage of pupils 52.0% 52.0% ------ ------
Appendix 1
3
13

Page 14

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
from deprived areas
gaining 5 or more
awards at level 5
CHN07 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 6
21.0% 25.0% ------ ------
CHN08a The gross cost of
"Children Looked After"
in residential based
services per child per
week
£3,860.00 £4,477.00 ------ ------
CHN08b The gross cost of
"Children Looked After"
in a community setting
per child per week
£307.00 £360.00 ------ ------
CHN09 Percentage of children
being looked after in the
community
90.40% 89.50% ------ ------
CHN10 Percentage of Adults
satisfied with local
schools
74.70% 72.00% 72.00% 70.70% It is essential to capture some aspect of the quality of children’s
services through the opinions of service users. Currently, the
only data comparable across all 32 Scottish councils is derived
from the Scottish Household Survey. The average satisfaction
levels in South Lanarkshire remains consistently higher than the
national average.
CHN11 Percentage of pupils
entering positive
destinations
96.2% 96.9% ------ ------ The percentage of pupils entering positive destinations in South
Lanarkshire remains consistently higher than both the National
Average and the Family Median.
CHN12a Overall Average Total
Tariff
1,007 981 971 918 The overall tariff level in South Lanarkshire remains above the
national level and aligns with the family median. The tariff scale
measures the latest and best achievements in each subject area
for national qualifications and a range of wider awards.
Qualifications are awarded tariff points based on their Scottish
Credit and Qualification Framework (SCQF) level. Average tariff
scores are calculated from the latest and best achievements of
pupils during the senior phase (S4-S6) across a range of awards
14

Page 15

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
included in a national benchmarking tool. This provides a
broader measure of achievement to consider alongside the
narrower Local Government Benchmarking Framework (LGBF)
attainment measures (CHN 4 to CHN 7). This measure can be
influenced by national assessments models, curricular models
and the selection of more appropriate routes to positive
destinations for young people.
CHN13a % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
Literacy
71.0% 73.5% 74.6% 74.0% South Lanarkshire slightly exceeds both the national average
and the family median. This metric measures the percentage of
pupils in Primary 1, Primary 4, and Primary 7 who have achieved
or surpassed the appropriate Curriculum for Excellence level in
reading, writing, and listening & talking. The Curriculum for
Excellence is designed to develop four key capacities in each
child or young person: to be a successful learner, a confident
individual, a responsible citizen, and an effective contributor.
CHN13b % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
Numeracy
79.0% 81.6% 81.5% 80.3% South Lanarkshire’s performance in numeracy is above the
national average, though slightly lower than the previous year.
This metric measures the percentage of pupils in Primary 1,
Primary 4, and Primary 7 who have achieved or exceeded the
appropriate Curriculum for Excellence level for their stage in
numeracy. The Curriculum for Excellence is designed to develop
four key capacities in each child or young person: to be a
successful learner, a confident individual, a responsible citizen,
and an effective contributor.
CHN14a Literacy attainment gap
P1,4,7 combined - %
point gap between the
least deprived and most
deprived pupils
24.40% 22.30% 21.75% 20.23% Since 2021/22, the gap between the percentage of pupils in
Primary 1, Primary 4, and Primary 7 who have achieved or
exceeded the appropriate Curriculum for Excellence level in
literacy, in the most and least deprived quintiles, has decreased
across South Lanarkshire. The Curriculum for Excellence is
designed to develop four key capacities in each child or young
person: to be a successful learner, a confident individual, a
responsible citizen, and an effective contributor. The Scottish
Attainment Challenge aims to achieve equity in education by
ensuring every child has the same opportunity to succeed, with a
particular focus on closing the poverty-related attainment gap.
CHN14b Numeracy attainment 18.60% 17.70% 17.38% 17.41% Since 2021/22, the gap in numeracy achievement between
15

Page 16

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
gap P1,4,7 combined -
% point gap between
the least deprived and
most deprived pupils
pupils in Primary 1, Primary 4, and Primary 7 from the most and
least deprived quintiles has decreased across South
Lanarkshire. The Curriculum for Excellence is designed to
develop four key capacities in each child or young person: to be
a successful learner, a confident individual, a responsible citizen,
and an effective contributor. The Scottish Attainment Challenge
focuses on achieving equity in education by ensuring every child
has the same opportunity to succeed, with a particular emphasis
on closing the poverty-related attainment gap.
CHN17 % of children meeting
developmental
milestones
80.80% 81.90% ------ ------
CHN18 % of funded early years
provision which is
graded good/better
88.55% 85.70% 94.40% 89.80% There has been a significant increase in the number of early
years provisions received good or better inspection outcomes.
The 2023/24 percentage is substantially higher than the national
average.
CHN19a School attendance rate ------ 90.10% 90.50% 90.30% The school attendance rate in South Lanarkshire has improved
slightly in 2023-24 and is better than the Scottish average.
(Results now collected annually)
CHN19b School attendance rate -
looked after children
------ 83.20% ------ ------ Results collected biennially - expected for 2024-25
CHN20a School exclusion rates
(per 1,000 pupils)
------ 18.10 ------ ------ Results collected biennially - expected for 2024-25
CHN20b School exclusion rates
(per 1,000 looked after
children)
------ 146.00 ------ ------ Results collected biennially - expected for 2024-25
CHN21 Participation rate for
16-19 year olds
92.31% 93.30% 93.80% 92.70% A young person is deemed to be participating when they are
actively engaged with an organisation for the purpose of
learning, training or work – work includes volunteering. This
annual participation measure reports on the activity of the wider
16-19 year old cohort, including those at school. South
Lanarkshire's performance continues to improve steadily and
remains above the national average.
CHN22 % of child protection
re-registrations within 18
months
5.80% 8.50% ------ ------
16

Page 17

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
CHN23 % Looked After Children
(LAC) with more than 1
placement in the last
year (Aug-July)
15.60% 13.90% ------ ------
CHN24 Percentage of children
living in poverty (After
Housing Costs)
22.8% 23.6% ------ ------
Climate Change CLIM01 CO2 Emissions area
wide per Capita
4.54 3.99 ------ ------
CLIM02 CO2 Emissions area
wide: emissions within
scope of Local Authority
(LA) per Capita
3.73 3.26 ------ ------
CLIM03 Emissions from
Transport per Capita
(New)
18.82 23.34 ------ ------
CLIM04 Emissions from
Electricity per Capita
(New)
43.78 39.11 ------ ------
CLIM05 Emissions from Natural
Gas per Capita (New)
74.14 73.49 ------ ------
Corporate Asset CORP
-ASSET0
1
Percentage operational
buildings that are
suitable for their current
use
94.73% 95.30% 95.60% 85.50% The result demonstrates an increase in
performance of properties that support
delivery of services in terms of suitability,
a slight increase on the 2023 result. The
result is better than the Scottish average.
Continued implementation of the Council's
Asset Management strategy and plans
has resulted in a clear focus in optimising
council buildings to ensure they are
suitable.
CORP
-ASSET0
2
Percentage internal floor
area of operational
buildings in satisfactory
condition
88.12% 88.90% 90.30% 89.80% The result indicates an increase in
performance of properties that are in a
satisfactory condition, an increase on the
2023 result. The result is better than the
Scottish average.
17

Page 18

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Despite the current financial climate and reduced funding to
Scottish Local Authorities, the figures show that, through
programmes of Prioritised Capital Investment, Lifecycle
Maintenance, Planned Preventative Maintenance and
Rationalisation, performance remains positive for the majority of
categories of property.
Corporate Services CORP01 Support services as a
percentage of total
gross expenditure
3.87% 3.90% 4.10% 4.10% There has been a small increase in the cost of support as a
percentage of total budget – this is a combination of an increase
in support costs and an increase in the total budget. These result
in an overall minor increase in the percentage.
CORP03
b
The percentage of the
highest paid 5%
employees who are
women
56.71% 59.60% 62.30% 59.80% There has been an increase in the proportion of women in the
top 5% earners in the council between 2022-23 and 2023-24.
This is primarily due to an increase in the number of women
appointed to posts within the authority.  New appointments of
woman during 2023-24 accounted for 62% of all appointments.
We continue to work in line with our current policies and
processes to ensure that our female employees at that top end
(which can shift depending on where the 5% falls), are being
progressed appropriately. Our picture is improving year on year
and we need to keep a focus on that along with the work that we
continue to do in line with our equalities duties.
South Lanarkshire Council’s performance in 2023-24 was better
than the Scottish average.
Actions: We will continue to monitor Equal opportunities
information and take action as required.
CORP03
c
The gender pay gap 4.00% 3.20% 2.70% 1.70% Performance has improved in 2023–24 through continued
monitoring of pay and grading and taking appropriate action to
address inconsistencies.  This includes job evaluation exercises
which have resulted in improved rates of pay for some female
employee groups.
South Lanarkshire Council’s pay gap is higher than the Scottish
average. South Lanarkshire Council’s workforce can differ in
makeup of other authorities; therefore this will produce different
average pay gap results.  For example, South Lanarkshire
Council figures include large female groups such as facilities,
18

Page 19

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
whilst other councils may deliver these services through Arms
length organisations and therefore the make up of council
employed staff may differ.
Actions: We will continue to monitor gender pay gap information
and act as required.  We continue to plan and implement
improvements in partnership with trade union representatives in
line with the principles of ‘Delivering a fairer future’.
CORP04 The cost per dwelling of
collecting Council Tax
£7.35 £6.72 £6.34 £5.89 The cost of collecting council tax per dwelling in 2023-24 has
decreased compared to 2022-23 primarily due to an increase in
Scottish Water commission. However, this is more expensive
than the Scottish average with the use of e-billing by some
councils likely to have reduced their cost of collection.
Actions: We will continue to review opportunities to reduce the
costs of collection. For 2025-26, this will focus on the costs of
billing for council tax.
CORP06
a
Sickness absence days
per teacher
7.24 7.40 8.00 7.60 The number of days lost due to sickness in 2023–24 has
increased compared to the previous year, notably an increase in
long term absences.
Throughout the year, the absence rates were lower month on
month than the previous year, apart from January and February,
which both recorded an increase.
South Lanarkshire Council’s performance has not improved
against the Scottish average, however in the recently published
SPi indicators, the Council overall ranking has improved from 20
to 17.
Actions: There is a cross-council focus on improving absence
levels. Case management discussions between managers and
personnel ensure actions are being progressed appropriately.
CORP06
b
Sickness absence days
per employee (non
teacher)
12.98 13.90 14.40 13.90 The number of days lost due to sickness in 2023–24 has
increased compared to the previous year, due to an increase in
long term absences.
Throughout the year, the absence rates were lower month on
month than the previous year, apart from January and February,
which both recorded an increase.
19

Page 20

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
South Lanarkshire Council’s performance has not improved
against the Scottish average, however in the recently published
SPi indicators, the Council overall ranking has improved from 20
to 17.
Actions: There is a cross-council focus on improving absence
levels. Case management discussions between managers and
personnel ensure actions are being progressed appropriately.
CORP07 Percentage of income
due from Council Tax
received by the end of
the year
96.19% 97.00% 96.40% 95.50% The percentage of income due from Council Tax in 2023-24 has
decreased compared to 2022-23. In 2022-23 113,000
households received £150 credited to their council tax account,
funded by Scottish Government, to help reduce the burden on
them of paying council tax during the cost-of-living crisis. In effect
council tax income was boosted by this one-off payment from
many households who ordinarily would have had significant
arrears. However, South Lanarkshire Council’s performance
continues to be better than the Scottish average.
Actions: Work to maximise council tax income collection will
continue in 2024-25, utilising all available recovery methods
CORP08 Percentage of invoices
sampled that were paid
within 30 days
92.94% 91.80% 94.20% 93.10% Invoice processing performance was in a positive position
throughout 2023-24, with performance exceeding target and
improving on the previous year’s performance. South
Lanarkshire Council’s continues to perform better than the
Scottish average.
CORP09 % of Crisis Grant
decisions within 1 day
99.00% 97.80% 100.00% 97.00% Improved processing performance in 2023-24 compared to
2022-23. South Lanarkshire Council continues to perform better
than the Scottish average.
Actions: Work will continue in 2024-25 to explore ways to
improve processing times.
CORP10 % of Community Care
Grant (CCG) Grant
Decisions within 15
days
97.50% 97.80% 96.50% 83.30% Although processing performance is slightly lower in 2023-24
compared to 2022-23, performance is still excellent and well
above the Scottish average.
Actions: Work will continue in 2024-25 to explore ways to
improve processing times.
CORP11 The percentage of
Scottish Welfare Fund
181.57% 168.40% 131.80% 128.90% The decreased proportion of SWF expenditure in 2023-24 when
compared to 2022-23 was due to the additional discretionary
20

Page 21

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
(SWF) Budget Spent funding allocated by the Council to the SWF from the Local
Authority Covid Economic Recovery (LACER) fund in 2022-23.
This additional funding was not available in 2023/24 and
therefore the SWF budget was substantially reduced.
Actions:  The administration of the SWF will continue to be
monitored closely and reported on a regular basis to ensure
effective financial management of the fund.
CORP12 The percentage of
Discretionary Housing
Payments (DHP)
Funding Spend
101.94% 104.80% 109.00% 101.00% South Lanarkshire continues to spend the budget it receives with
performance well above the Scottish average.
Actions:  The administration of DHP funding will continue to be
monitored closely and reported on a regular basis to ensure
effective financial management of the fund.
Culture & Leisure
Services
C&L01 Cost per attendance at
sports facilities
£6.30 £4.75 £3.91 £4.33 In 2023/24, the cost per attendance at sports facilities is less
than last year, and below (and therefore better than) the Scottish
average.  SLC currently ranks 17th across Scotland and fourth in
the ‘family group’.  Services continue to be operated under very
challenging circumstances with reduced resources and aging
facilities which require long-term investment, however high
standards of service delivery continue to be provided, and
attendances are increasing on the previous year.
C&L02 Cost per library visit £5.07 £3.82 £3.32 £2.38 In 2023/24, the cost per library visit is lower than the previous
year, however we remain slightly above (and therefore worse
than) the Scottish average.  SLC currently ranks 16th across
Scotland and fifth in the ‘family group’.  Work continues to
operate and realign services to maximise use of available
resources, with a steady increase in customers accessing digital
services. A high level of service delivery continues to be
provided, and overall attendances have increased on the
previous year.
C&L03 Cost of museums per
visit
£3.75 £2.61 £1.65 £3.50 Cost per museum visit is less than the previous year, and below
(and therefore better than) the Scottish average.  SLC currently
ranks 6th across Scotland and second in the ‘family group’. Use
of available resources continues to be maximised. With a steady
increase in customer engagement through digital services, a
high-quality service delivery continues to be provided, and
attendance has increased overall on the previous year.
21

Page 22

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
C&L04 Cost of parks and open
spaces per 1,000
population
£31,458 £32,304 £25,778 £23,338 In previous years, the costs of the following service areas have
been recorded incorrectly in the LFR: golf courses, bowling
greens, gravediggers, and the care of garden scheme. This has
meant that the cost of parks and open spaces has been
overstated in the past.  This has been rectified for 2023/24 which
as seen performance improve and ranking moving from 27th to
20th overall.
The grounds service continues to operate a higher specification
than other councils, particularly in relation to grass cutting.
C&L05a Percentage of adults
satisfied with libraries
67.30% 66.30% 69.00% 67.00% The satisfaction rate for adults satisfied with library services
within South Lanarkshire is slightly higher than 2022/23 and
above the Scottish average and above the ‘family grouping’
average.
C&L05b Percentage of adults
satisfied with parks and
open spaces
83.00% 86.70% 86.30% 85.00% Satisfaction with parks and open spaces within South
Lanarkshire remains above the Scottish average.
C&L05c Percentage of adults
satisfied with museums
and galleries
65.70% 66.30% 70.70% 69.30% The satisfaction rate for adults satisfied with museum and
galleries within South Lanarkshire is increasing and is above the
Scottish average and above the ‘family grouping’ average.
C&L05d Percentage of adults
satisfied with leisure
facilities
68.00% 69.70% 66.70% 67.00% The satisfaction rate with leisure facilities in South Lanarkshire is
slightly lower than 2022/23, and slightly below the Scottish
average. However in the context of the ‘family grouping’ South
Lanarkshire sits above the group average.  Residents completing
the household survey may not be users of leisure facilities and
are merely giving a perceived view, rather than based on actual
experience.
SLLC conducted a Customer Satisfaction Survey in 2023/24 to
assess actual service delivery which focused on people who use
leisure facilities that concluded staff were excellent, scoring 98%
and gave an overall satisfaction rate of 94% (combined score for
value for money/ cleanliness/ quality of services and equipment).
Customers have consistently rated leisure services highly over
several years.
Economic Development ECON01 Percentage of 22.04% 12.90% 11.80% 12.10% The transformation review of employability has included the
22

Page 23

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
unemployed people
assisted into work from
council funded/operated
employability
programmes
roll-out of the Advice Pro client tracking system to all
programmes for 2024/25. This new tracking system will ensure
all job outcomes are reported accurately. The figure reported
here for 2023/24 reflects the position before the use of Advice
Pro client and as a result there may be some under-reporting of
outcomes.
Overall, the total number of jobs is anticipated to increase in
2024/25, and going forward this, combined with the more
accurate reporting above, should result in an increase in the
percentage of unemployed people assisted into work from
council funded/operated employability programmes.
ECON02 Cost of planning and
building services per
application
£4,695.00 £5,710.00 £5,588.00 £6,675.00 This measure is calculated on the basis of the overall fee income
for planning applications and building warrants divided by the
total number of applications received by the council. The overall
cost of planning and building services per application for SLC in
2023/24, is lower (and therefore better) compared to the previous
year, is tenth lowest in Scotland and is lower (and therefore
better) than the national average. Total income across the
service fell during the year and there was also a reduction in the
number of applications received. In addition, there continued to
be a significant turnover in staff which meant the service was not
fully resourced at any point during 2023/24.
ECON03 Average time per
business and industry
planning application
(weeks)
20.59 Wks 22.90 Wks 16.00 Wks 10.70 Wks The average time for processing business/industrial planning
applications in South Lanarkshire improved in 2023/24, however,
this remains higher (worse than) the Scottish average. A number
of “legacy” applications were decided during this year which
impaired the overall processing times.  There was significant
turnover in staff during 2023/24, however additional resources
have been brought into the Planning Service which will positively
impact on the processing of planning applications.
ECON04 Percentage of
procurement spend on
local enterprises
18.2% 18.1% 19.5% 30.7% This figure shows an upward trend from previous years. While it
is still below the national average, it should be noted that this
national average is skewed by the more rural and island local
authorities where access to suppliers is greatly reduced and so a
reliance on local suppliers is more relevant.
23

Page 24

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ECON05 No of business gateway
start-ups per 10,000
population
15.71 16.00 12.70 13.60 This reduced figure was delivered by an external Business
Gateway delivery organisation. This resulted in South
Lanarkshire bringing the Business Gateway delivery “in-house”
and this came into effect in March 2024.
ECON06 Investment in Economic
development and
Tourism per 1,000
population
£74,111 £72,841 £58,263 £115,357 This downward trend can be explained by business grants
paying out £1,332,718 in 2022/23 and £471,390 in 2023/24. This
increased spend in 2022/23 coincided with Covid 19 grant
funding being available from the Scottish Government.
ECON07 Percentage of people
earning less than the
living wage
12.50% 10.00% 10.60% 10.20% South Lanarkshire’s performance has dropped slightly since last
year and remains lower that the Scottish average. The pan
Lanarkshire Living Wage Campaign Group continues to meet
quarterly and promote the Living Wage on an ongoing basis. A
new Action Plan is being worked on which will be submitted to
CER Committee in due course, and along with new members,
the group will be well placed to achieve and maintain our target
of 10% of employees earning the real Living Wage.
South Lanarkshire has 180 Living Wage accredited employers
with 2,639 employees gaining an uplift in salary.  This is the
fourth highest Council area in Scotland.
ECON08 Percentage of
properties receiving
superfast broadband
97.00% 97.60% 98.30% 95.90% In 2023/24, there was an increase of properties in South
Lanarkshire with access to high-speed broadband and speeds
greater than 30 Mbps. This figure continues to rise slowly and
remains above the Scottish average.
The majority of the properties not yet able to access high speed
broadband are located within rural areas. These properties are
either included within the Scottish Government's R100
investment programme and projected to receive full fibre
connection by 2026, or are too difficult or expensive to connect to
an existing network and are therefore eligible for the Scottish
Broadband Voucher Scheme to help find alternative solutions.
ECON09 Town vacancy rates 9.85% 14.00% 14.80% 12.30% Whilst the trend appears to be moving in a negative direction,
this is substantially influenced by the major changes happening
in East Kilbride and Hamilton Town Centres. The rest of the
towns continue to perform well with the majority showing vacancy
rates at or below the national average.
24

Page 25

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ECON10 Immediately available
employment land as a
% total land allocated
for employment
purposes in the local
development plan
12.73% 12.10% 12.10% 24.50% The reduction in immediately available employment land has
been recognised as a challenge which needs to be considered in
the drafting of the Local Development Plan 3 (LDP3). This work
is underway and through the call for sites process it is
anticipated the position can be addressed.
ECON11 Gross Value Added
(GVA) per capita
£19,400 £20,624 ------ ------
ECON12
a
Claimant Count as % of
Working Age Population
4.7% 3.2% 3.0% 3.1% The rate for South Lanarkshire has improved slightly in 2023/24
and is slightly below (better than) the Scottish average.
ECON12
b
Claimant Count as % of
16-24 Population
5.30% 3.50% 3.50% 3.50% The rate for South Lanarkshire has remained the same as last
year's result and is the same as the Scottish average in 2023/24.
Environmental Services ENV01a Net cost of waste
collection per premise
£86.51 £88.16 £89.16 £78.48 The net cost of waste collection per premises in South
Lanarkshire increased in 2023/24. This is higher (worse) than the
Scottish average and slightly higher than the previous year. The
overall ranking position has fallen from 21st to 25th, the same
position as in 2021/22.
In 2023-24 the council continued to offer one free special uplift
and compostable bags to residents. Composting bags are no
longer offered for free to local residents, so in 2024-25
performance is expected to improve.
ENV02a Net cost of waste
disposal per premise
£113.57 £106.24 £121.50 £104.41 The net cost of waste disposal per premises in South
Lanarkshire increased in 2023/24 in comparison with 2022/23
and is higher (worse) than the Scottish average. The overall
ranking position fell from 15th to 24th. A number of waste
disposal contracts saw an increase in 2023/24 and there was
also an increase in costs from Household Waste Recycling
Centres (HWRCs) as well as new costs for the disposal of
Persistent organic pollutants (POPs) materials.
The net cost of waste disposal per premise is generally higher
than the Scottish average due to the fact that the council does
not send non-recyclable waste to landfill. Costs to thermally treat
non-recyclable waste are higher than sending the material to
landfill. It does mean though that the council has a higher landfill
25

Page 26

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
diversion rate than local authorities that are still in the process of
procuring a solution to the forthcoming ban on the landfilling of
biodegradable municipal waste.
ENV03a Net cost of street
cleaning per 1,000
population
£17,640.00 £19,632.00 £18,191.00 £16,181.00 The costs associated with street cleaning operations reduced in
2023/24. While this is an improvement with South Lanarkshire
moving from rank 28th up to 24th place, the figure remains
above (and therefore worse than) the Scottish average.
The higher costs associated with SLC street cleaning operations
are attributed to the more extensive levels of services that are
provided and the specification applied to these operations which
is greater than other local authorities: graffiti removal, street
cleaning including shifts, fly tipping uplift, fly posting removal,
blood spills, hypodermic needle uplift, dead animal uplift and
both the large and smaller mechanical sweeping fleet that we
utilise.  This equipment performs an essential and legislatively
required service including the removal of detritus from
roads/channels, (COPLAR Duty 2)
Since the Litter Strategy was approved in 2022, work has been
ongoing with regards to making changes to reduce the impacts
and costs associated with fly tipping and general littering. The
litter action steering group, which includes service reps across
the Council, has continued implementation of the litter action
plan to tackle these issues. This is having an environmental
impact, and it is anticipated that this will continue to result in a
subsequent decrease in spend across the area.
ENV03c Street cleanliness score 92.10% 92.30% 91.60% 92.10% The South Lanarkshire street cleanliness score remains close to
the Scottish average.
ENV04a Cost of roads per
kilometre
£19,295.00 £17,762.00 £17,772.00 £13,481.00 Spend per kilometre of road has seen a very marginal increase
compared to the previous year. The spending figure varies year
on year, dependent on the level of City Deal project spend.
In 2023-24, South Lanarkshire remained the 11th highest
investing local authority per kilometre of road. The level of spend
in South Lanarkshire remains higher than the Scottish average,
26

Page 27

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
reflecting the council’s decision to continue to invest in our road
network.
Recent high levels of construction inflation combined with static
maintenance budgets have significantly reduced the length of
road network that can be resurfaced / repaired on an annual
basis.
ENV04b Percentage of A class
roads that should be
considered for
maintenance treatment
23.99% 23.90% 24.90% 28.90% There has been a significant decline in the condition of A class
roads in South Lanarkshire. Recent high levels of construction
inflation and static maintenance budgets have significantly
reduced the length of road network that can be resurface /
repaired on an annual basis. However, it should be noted the
condition of the A Class network in South Lanarkshire remains
better than the Scottish average.
ENV04c Percentage of B class
roads that should be
considered for
maintenance treatment
25.62% 26.10% 27.80% 32.50% There has been regression in the condition of B class roads in
South Lanarkshire however their condition remains substantially
better than the Scottish average.
ENV04d Percentage of C class
roads that should be
considered for
maintenance treatment
34.91% 35.60% 36.50% 33.40% There has been regression in the condition of C class roads in
South Lanarkshire and their condition falls below that of the
Scottish average.
Our C class road network is fully surveyed every four years and
during survey period 2022-24 we observed a regression in its
condition.  Our road surfacing decision making process takes
account of road category and as a result a greater level of
investment is targeted towards our more strategic road network
(A Class).   As a result of rising construction inflation and static
maintenance budgets over recent years the amount of
resurfacing we have been able to carry out on an annual basis
has reduced significantly.  Recent survey results for 2023-25
have noted regression in A, B and C road classes but it is hoped
that following recent budget announcements that we will be able
to stabilise the road condition over the coming years.
ENV04e Percentage of U
(unclassified) roads that
should be considered
29.91% 31.60% 32.60% 36.20% Unclassified roads make up a sizeable proportion of the road
network in South Lanarkshire. In 2023/24, it is noted that there
has been a further regression in their condition, however
27

Page 28

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
for maintenance
treatment
performance remains better than the Scottish average.
ENV05a Cost of Trading
Standards, Money
Advice & Citizen Advice
per 1,000 population
£3,464.00 £3,088.00 £3,282.00 £7,256.00 The cost of Trading Standards per 1,000 population in 2023/24
increased from the 2022/23 level due the completion of
recruitment in 2023. However, South Lanarkshire service costs
are still expected to remain well below (and therefore better than)
the Scottish average.
Despite costs being below the Scottish average, the service
provides a good level of protection for local consumers.
ENV05b Cost of environmental
health per 1,000
population
£13,280.00 £12,900.00 £11,690.00 £15,518.00 The cost of environmental health per 1,000 population
decreased in 2023/24, compared to the previous year, due to
difficulties in recruiting fully qualified officers and continues to
remain well below (and therefore better than) the Scottish
average.
Despite costs being below the Scottish average, the service
provides a good level of public health protection for local
communities.
ENV06 The percentage of total
household waste arising
that is recycled
40.40% 41.10% 41.00% 43.50% The percentage of total household waste that is recycled
decreased slightly in 2023/24 compared to the previous year and
is still below the Scottish average. Multi-occupancy properties
(flatted developments) make up over 30% of housing stock in
South Lanarkshire. The lack of space at these properties means
opportunities to provide recycling services are limited. Moreover,
when recycling bins are provided often the only option is to
provide large communal bins, where contamination rates are
significantly higher.
It should also be recognised that South Lanarkshire is one of the
few councils to still provide a fortnightly residual waste collection,
meaning residents have a minimum of 120L of residual waste
capacity each week. It is accepted that recycling rates are lower
when households receive more residual waste capacity.
ENV07a Percentage of adults
satisfied with refuse
84.30% 85.30% 86.00% 78.30% The percentage of adults satisfied with refuse collection is taken
from the Scottish Household Survey. The figure is higher than the
28

Page 29

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
collection Scottish average and an improvement on the previous year. It
places South Lanarkshire in the second quartile for performance.
ENV07b Percentage of adults
satisfied with street
cleaning
61.70% 61.70% 62.30% 58.00% The percentage of adults satisfied with street cleaning in South
Lanarkshire has increased slightly and remains above the
Scottish average.
Financial Sustainability FINSUS0
1
Total useable reserves
as a % of council annual
budgeted revenue
14.74% 22.00% 19.60% 23.90% The council has seen a decrease in useable reserves as a
percentage of council budget. This reflects a decrease in the
level of useable reserves (significantly as a result of reserves
used in the 2023/2024 budget to support the Council's financial
strategy) and an increase in the council’s annual expenditure
budget, meaning that arithmetically, the percentage of useable
reserves to annual budget decreases.
The important factor to consider is the purpose and use of
reserves, and the fact is that the council is clear on what
reserves we have, and the purpose of them. The use of Service
Concession and Superannuation Reserves will affect the figures
for the next few years as they are used to support the council's
financial strategy. The key factor is that the reserves are
sufficient.
FINSUS0
2
Uncommitted General
Fund Balance as a % of
council annual budgeted
net revenue
1.50% 1.50% 1.40% 2.30% The value of the Council’s Uncommitted General Fund balance
has not changed from 2019/2020. The council's budget has
increased therefore resulting in a minor decrease in the
percentage.
This is very much an arithmetic impact. Our uncommitted
balance has not changed, but the budget has changed due to
external factors including government grant ringfenced for
specific purposes. The council’s position on reserves is included
in the Revenue Budget Strategy.
FINSUS0
3
Percentage of Financing
Costs to Net Revenue
Stream- General Fund
5.18% 5.00% 3.70% 5.80% This ratio shows a reduction in the General Fund’s ratio of
financing costs to net revenue stream. The overall reduction
reflects a reduction in financing costs mainly due to a change in
how we account for the council’s schools PPP project combined
with an increase in income (Council Tax, NDR and Non Ring
Fenced Government Grants). The position reflects the product of
strategic, sustained capital investment in schools and roads over
more than twenty years.
29

Page 30

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
FINSUS0
4
Percentage of Financing
Costs to Net Revenue
Stream- Housing
Revenue Account
16.04% 17.20% 7.70% 20.00% This ratio shows a significant reduction in the HRA’s ratio of
financing costs to net revenue stream. The overall reduction
reflects a reduction in loan charges from the HRA Loans Fund
Review combined with an increase in income (rents).
The position reflects the product of strategic, sustained capital
investment in the council’s housing stock.
FINSUS0
5
Actual outturn as a
percentage of budgeted
expenditure
100.00% 100.00% 100.00% 99.60% The outturn reflects that the council reported a breakeven
position after all transfers to reserves. The SLC position is
consistent across years, but movement in other councils' figures
may result in a change to our ranking going forward.
Housing Services HSN01b Gross rent arrears (all
tenants) as at 31 March,
as a percentage of rent
due for the reporting
year
8.91% 8.70% 8.00% 9.50% Resource target achieved and significantly lower than Scottish
average.
The strong performance has been secured despite the financial
pressures which tenants continue to face due to the economic
situation. A range of supports measures continue to assist
tenants facing financial hardship. The Council will continue to set
affordable rents and provide advice.  Performance continues to
be routinely monitored with a focus on continuous improvement.
HSN02 Percentage of rent due
in the year that was lost
due to voids
0.60% 0.60% 0.50% 1.80% Performance this year has improved compared to the previous
two years. The Resource continues to focus on void
management to minimise void rent loss with a number of
improvement actions identified.
Performance in this area has been consistently among the best
in Scotland compared to other Local Authorities. In the past three
years we have been the second lowest void rent loss and well
below the Scottish average.
HSN03 Percentage of dwellings
meeting Scottish
Housing Quality
Standards
78.32% 79.70% 83.60% 77.80% While performance improved in the year and is above the
Scottish average it continues to remain below the position
reported in 2020/21 before the standard was revised to include
Fixed Electrical Testing and installation of combined smoke and
carbon monoxide alarms. This trend was evident across other
local authorities with the Scottish average also decreasing.
A revised process is In place to address to improve access to
properties to carry out the necessary work /installations.
We continue to engage with the Scottish Housing Regulator on a
30

Page 31

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
monthly basis.
HSN04b Average number of days
taken to complete non
emergency repairs
11.76 days 11.60 days 14.50 days 10.00 days Performance in this area has decreased and although above the
Scottish average is viewed positively because it is based on an
appointment-based system that is supported by tenants and
tenants’ representatives.
This was expected as a result of the suspension of our
non-emergency repairs between June-September 2023. The
increase is due to the level of demand on the service when
repairs recommenced.
Improvement activity within the repairs service continues in
2024-25 to support the reduction of the average time taken
although the councils focus will continue to be on quality rather
than speed of service.
HSN05a Percentage of council
dwellings that are
energy efficient
98.64% ------ ------ ------ The 2025 and 2032 EESSH Milestones have been suspended as
the Scottish Government are reviewing the EESSH2 standards to
strengthen and realign the standard with the target for net zero
heat in houses from 2045.
In advance of the new national indicators, a review of housing
stock is underway to determine the additional energy measures
required to achieve energy efficiency and carbon reduction
requirements within the council’s housing stock.
Social Work Services SW01 Home Care costs per
hour for people aged 65
or over
£30.47 £31.52 £37.10 £33.59 Home Care costs per hour for people aged 65 or over in South
Lanarkshire increased in 2023-24 compared to 2022-23, with
ranking dropping from 13 to 18. South Lanarkshire had the
second highest cost per hour amongst the comparator Family
Group, however, costs in the Family Group vary significantly.
The number of Home Care Hours used within the calculation for
this indicator is inclusive of services provided by different
staff-groups or purchased from different agencies. The costs of
such services are included whether they are provided by the
local authority, purchased from another local authority, or
purchased from private or voluntary sector providers.
31

Page 32

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Internally, the outcome of a job evaluation within the Care at
Home service resulted in increased employee costs following
increased salaries for frontline staff.
Costs have increased as a result of a number of factors.
Nationally, inflation and increased cost of living have impacted
more generally on costs. In addition, there were substantial
increases to the living wage which resulted in increased rates for
Care at Home providers.
SW02 Self Directed Support
(Direct payments and
managed personalised
budgets) spend on
adults 18+ as a
percentage of total
social work spend on
adults 18+
3.98% 6.40% 6.40% 9.10% Self-Directed Support (Direct payments and managed
personalised budgets) spend on adults 18+ as a percentage of
total social work spend on adults 18+, in South Lanarkshire has
decreased slightly from 2022-23, resulting in South Lanarkshire’s
ranking dropping from 13 to 15. This indicator highlights only the
social work spend allocated via Direct Payments, Personalised
Managed Budgets and Individual Service Fund (ISF) - options 1
and 2. It does not recognise local authority managed services -
option 3, which provide a legitimate choice for individuals or a
default position in the legislation for individuals who do not wish
to exercise their right to choose.
Locally and nationally, the uptake of Options 1 and 2 is likely to
be impacted by the changed environment of social care, with
providers experiencing recruitment challenges and thus unable
to offer pre-pandemic levels of service, alongside a reduction in
the availability of Personal Assistants (PAs).  In South
Lanarkshire, the commissioned information and advice service,
Take Control, has noted a reduction in availability of suitable
PAs, which in part may be driven by the South Lanarkshire PA
pay rate being less competitive when compared with other local
employers, however acknowledging it is in line with the living
wage and external provider rates. Work was initiated in this
period to identify where outcomes of supported people/carers
were not being achieved through Option 1, which may have led
to individuals choosing to have outcomes met through
32

Page 33

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
LA-managed services, Option 3.
Relevant improvement actions are in place, to ensure that
individuals wishing to exercise the choice and control of Options
1 and 2 are supported to do so.  Social Work and Take Control
have engaged with employability services, local colleges, and
Strathclyde University to promote PA vacancies in the South
Lanarkshire area to individuals who are interested in pursuing a
career in social work/social care.  Work is ongoing to upskill the
workforce in relation to promoting Options 1 and 2 and ensuring
that the right information is available in relation to the benefits
and the challenges. Similarly, work continues in relation to
improving public-facing information in relation to all the SDS
options.
SW03a Percentage of people
aged 65 and over with
long-term care needs
receiving personal care
at home
61.89% 61.00% 61.80% 62.60% South Lanarkshire performance increased in 2023-24 and is
similar to the Scottish average position. South Lanarkshire’s
ranking has improved from 19 to 18. However, this indicator
excludes individuals who are assessed and waiting for a service
which currently accounts for approximately 1,500-2,000 hours
each week.
The increase is in line with an ageing population and increasing
demand for services and the resulting increasing need for
personal care supports. The introduction of Home Assessment
Teams has played a significant role in maximising the
independence of service users and supporting people to learn
and relearn tasks following a period of ill health.
SW04b Percentage of adults
supported at home who
agree that their services
and support had an
impact in improving or
maintaining their quality
of life
80.00% ------ 63.30% 69.80% Lanarkshire in 2023-24, resulting in national ranking decreasing
from 11 to 30.  Nationally, there has been an overall decline in
performance. These results are drawn from the Health and Care
Experience (HACE) survey which asks about people’s
experiences of accessing and using their GP practice and other
local health and social care services; receiving care, support and
help with everyday living; and caring responsibilities.  It is
important to note that respondents of the survey are selected
from a sample of people registered with GPs and a proportion
33

Page 34

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
are not likely to be Social Work Service Users. Participation in
the HACE survey decreased in South Lanarkshire from 25% in
2021-22 (7,457 responses from 29,748 forms sent out) to 21% in
2023-24 (5,552 responses from 26,824 forms sent out).
South Lanarkshire University Health and Social Care Partnership
(SLUHSCP) began working with Care Opinion in early 2023,
officially launching in December 2023. Care Opinion is an
independent platform that allows service users to share feedback
on their health and social care experiences directly with services.
In Q4 2023-24, 82% of stories received from service users were
rated completely positive. Services have access to the feedback
received on Care Opinion and the ability to collaborate with
service users regarding service changes and improvements
SW04c Percentage of adults
supported at home who
agree that they are
supported to live as
independently as
possible
82.16% ------ 67.20% 72.40% Nationally, performance for this indicator declined in 2023-24.
South Lanarkshire also reports a decline in performance and a
resulting drop in ranking from 9 to 29. These results are drawn
from the Health and Care Experience (HACE) survey which asks
about people’s experiences of accessing and using their GP
practice and other local health and social care services;
receiving care, support and help with everyday living; and caring
responsibilities.  It is important to note that respondents of the
survey are selected from a sample of people registered with GPs
and a proportion are not likely to be Social Work Service Users.
Participation in the HACE survey decreased in South
Lanarkshire from 25% in 2021-22 (7,457 responses from 29,748
forms sent out) to 21% in 2023-24 (5,552 responses from 26,824
forms sent out).
South Lanarkshire University Health and Social Care Partnership
(SLUHSCP) began working with Care Opinion in early 2023,
officially launching in December 2023. Care Opinion is an
independent platform that allows service users to share feedback
on their health and social care experiences directly with services.
In Q4 2023-24, 82% of stories received from service users were
rated completely positive. Services have access to the feedback
34

Page 35

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
received on Care Opinion and the ability to collaborate with
service users regarding service changes and improvements.
SW04d Percentage of adults
supported at home who
agree that they had a
say in how their help,
care or support was
provided
65.58% ------ 55.40% 59.60% South Lanarkshire reports a decline in performance in 2023-24,
however, ranking has been unaffected at 27. Nationally there has
also been a decline in performance. These results are drawn
from the Health and Care Experience (HACE) survey which asks
about people’s experiences of accessing and using their GP
practice and other local health and social care services;
receiving care, support and help with everyday living; and caring
responsibilities.  It is important to note that respondents of the
survey are selected from a sample of people registered with GPs
and a proportion are not likely to be Social Work Service Users.
Participation in the HACE survey decreased in South
Lanarkshire from 25% in 2021-22 (7,457 responses from 29,748
forms sent out) to 21% in 2023-24 (5,552 responses from 26,824
forms sent out).
South Lanarkshire University Health and Social Care Partnership
(SLUHSCP) began working with Care Opinion in early 2023,
officially launching in December 2023. Care Opinion is an
independent platform that allows service users to share feedback
on their health and social care experiences directly with services.
In Q4 2023-24, 82% of stories received from service users were
rated completely positive. Services have access to the feedback
received on Care Opinion and the ability to collaborate with
service users regarding service changes and improvements.
SW04e Percentage of carers
who feel supported to
continue in their caring
roles
28.70% ------ 28.10% 31.20% South Lanarkshire reports a slight decline in performance and a
resulting drop in ranking from 20 to 27.  Nationally however,
performance has increased from in 2023-24.  These results are
drawn from the Health and Care Experience (HACE) survey
which asks about people’s experiences of accessing and using
their GP practice and other local health and social care services;
receiving care, support and help with everyday living; and caring
responsibilities.  It is important to note that respondents of the
survey are selected from a sample of people registered with GPs
and a proportion are not likely to be Social Work Service Users.
35

Page 36

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Participation in the HACE survey decreased in South
Lanarkshire from 25% in 2021-22 (7,457 responses from 29,748
forms sent out) to 21% in 2023-24 (5,552 responses from 26,824
forms sent out).
Contrary to the HACE results, Lanarkshire Carers successfully
achieved Carers Trust Excellence for Carers Award in 2023
following rigorous assessment of their services Pan-Lanarkshire.
Additionally, there was a 20% increase in the number of new
carers identified by Lanarkshire Carers in 2023-24 compared to
the previous year, this assists more people being able to access
support than would otherwise be the case.
SW05 Residential cost per
week per resident for
people aged 65 or over
£755.00 £736.00 £717.00 £723.00 This measure relates to the average net cost to the council.
South Lanarkshire had a lower spend per week in 2023-24
compared to the Scottish average. South Lanarkshire’s ranking
has improved from 20 to 19.
The performance of each council is influenced by demographics
and contributions made by service users which mean costs vary
significantly. Within the South Lanarkshire LGBF comparative
Family Group, the residential costs per week per resident for
people aged 65 or over vary by over £500 between the lowest
and highest costs. The cost of care also increases year on year
with changes to the national care home rate.
SW06 Rate of readmissions to
hospital within 28 days
per 1,000 discharges
106.27 99.90 96.50 103.90 In South Lanarkshire the rate of readmissions decreased further
this year and South Lanarkshire continue to perform better than
the Scottish average.  Information on the six areas of the Health
and Social Care Delivery Plan are monitored monthly and
formally reported on a quarterly basis to the Social Work
Committee (alongside the Integration Joint Board).
South Lanarkshire continue to embed the Home First approach
across the localities supported by Home Assessment Teams
where necessary. This reablement approach optimises
independence over a six-week period, enabling people to remain
in their own homes, or supporting discharge from hospital with
36

Page 37

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
the support of health, social care and third sector provision to
meet any ongoing needs identified.  The intermediate care unit is
now embedded, supporting reablement and flow as a step-down
option.
SW07 Percentage of care
services graded 'good'
or better in Care
Inspectorate Inspections
76.08% 77.00% 79.90% 77.00% In South Lanarkshire, the proportion of care services graded
'good' or better in Care Inspectorate inspections increased in
2023-24.  The Scottish average position also increased in
2023-24. This performance has resulted in South Lanarkshire's
ranking remaining at 17.
During 2023-24, the Care Inspectorate published gradings from
29 inspections within South Lanarkshire care services, 3 of which
were local authority services and included a children’s house, a
care home for older people and South Lanarkshire Adoption
Services; all received grades of 4 – good or 5 – very good.  The
Council implements improvement actions from inspections and
reports on inspection outcomes at each meeting of the Social
Work Resources Committee, with further note within the Chief
Social Work Officer’s annual report.
SW08 Number of days people
spend in hospital when
they are ready to be
discharged, per 1,000
population (75+)
910.36 1,005.00 938.00 846.00 Performance for this indicator has improved in 2023-24. The
Scottish average declined and is in line with pre-pandemic
performance.  South Lanarkshire ranking improved from 22 to
21.
The Target Operating procedure has been implemented across
all Lanarkshire sites supporting planned date of discharge
planning at an earlier stage.  The initial work undertaken as part
of the Discharge without Delay (DWD) programme has now been
subsumed within Operation Flow. Hospital staff and other
partners work together closely to establish clear timeframes of
when someone will go from hospital to community.
The Home Assessment Teams are a key element of this
programme and as they embed, they will have greater impact
addressing the pressures associated with people who are
delayed in hospital by putting the person at the centre of the
37

Page 38

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2023/24
Service LGBF
Ref
Description
2021/22
Results
2022/23
Results
2023/24
Results
Result
Trend
Scotland
2023/24
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
process and allowing for a 6-week period of rehabilitation and
enablement on discharge, targeted through a robust assessment
and care plan. Early and effective planning improves the benefits
for those currently in hospital by discharging home at the earliest
and safest opportunity and creates capacity for patients who
require admission. The intermediate care unit within Blantyre Life
is now also supporting reablement and flow from hospital as a
step-down option.
38

Page 39

Appendix 2 
Family Group Analysis graphs for indicators with results below the Scottish average 
FAMILY GROUPS 
For indicators relating to Children, Social Work and Housing services, councils with
similar levels of deprivation are grouped together. South Lanarkshire’s family group
for these indicators is: 
• Clackmannanshire 
• Dumfries & Galloway 
• Falkirk 
• Fife 
• Renfrewshire 
• South Ayrshire 
• South Lanarkshire 
• West Lothian 
For indicators relating to Environmental, Culture & Leisure, Economic Development,
Corporate and Property services, councils with similar urban/rural profiles are
grouped together. South Lanarkshire’s family group for these indicators is: 
• Angus 
• Clackmannanshire 
• East Renfrewshire 
• Inverclyde 
• Midlothian 
• Renfrewshire 
• South Lanarkshire 
• West Lothian 
3
39

Page 40

Community and Enterprise Resources 
40

Page 41

41

Page 42

42

Page 43

43

Page 44

44

Page 45

Education Resources 
45

Page 46

Finance and Corporate Resources 
46

Page 47

47

Page 48

Housing and Technical Resources 
Social Work Resources 
48

Page 49

49

Page 50

50

Page 51

51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 1 April 2025
Report by: Chief Executive  
Subject: Statutory Performance Information Direction 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Forum with an overview of the latest Statutory Performance
Information (SPI) Direction, as published by the Accounts Commission on 19
December 2024
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the requirements of the Direction 2024 be noted;
(2) to note that the implications arising from the Direction 2024 for South
Lanarkshire Council have been considered and will be implemented; and
(3) to note that the period covered by the Direction 2024 relates to performance
reporting for financial years 2025/2026, 2026/2027 and 2027/2028.
[1recs]
3. Background
3.1. The Direction is given by the Accounts Commission under section 1(1)(a) of the
Local Government Act 1992, and directs relevant bodies to publish such information
relating to their activities which will, in the Commission’s opinion: ‘facilitate the
making of appropriate comparisons (by reference to the criteria of cost, economy,
efficiency and effectiveness and of securing best value) between:- 
i) the standards of performance achieved by different relevant bodies in that
financial year; and
ii) the standards of performance achieved by such bodies in different financial
years. 
3.2. Local appointed auditors then assess the adequacy of councils’ arrangements for
meeting the requirements set out in the Schedule to the Direction as part of their
annual audit work. Audit findings from this work will be used to inform the Controller
of Audit’s reporting to the Commission on the extent to which individual local
authorities are meeting their duty to secure best value – in particular, their
obligations in relation to use of resources, continuous improvement and public
performance reporting.  
4
53

Page 54

3.3.  In the 2023/2024 Annual Audit Report the external auditors (Audit Scotland)
confirmed that ‘the Council’s performance reporting arrangements were satisfactory.
The Council’s website covers all the requirements set out in the SPI Direction issued
by the Accounts Commission. The Council continues to improve its public reporting
of performance information through clear alignment of performance information with
its key strategic outcomes. Alongside overarching and service level performance
reports the Council publishes Annual Performance Spotlights, 'bite-sized'
performance information, per Connect Outcome.’ 
4. Background
4.1. The Accounts Commission is clear that it is for councils themselves decide what
information they report about performance. 
4.2.  In developing the SPI Direction 2024, the Accounts Commission consulted a range
of stakeholders and, as a result, sought to make the requirements in this new
Direction clearer and more specific, to ensure councils receive more clarity about
what is expected of them and how to ensure they are complying. 
4.3.  The new Direction 2024, attached as Appendix 2, continues to require that each
council’s reporting still meets the following three criteria:- 
 balanced: in respect of areas in which performance has improved and those in
which it has not improved or has declined
 timely: in the interests of transparency and to enable the council to respond
promptly where remedial action is required, it should be possible for councils to
publish an annual performance report within nine months – and no later than
twelve months – after the year end
 accessible: able to be easily understood by all citizens and make appropriate
use of technology to display performance information in a variety of formats 
4.4.  In place of SPI 1 and 2 from the previous Direction the new Direction 2024 sets out
four keys areas that councils’ performance information should cover, whilst also
taking cognisance of their Best Value duties and requirements. 
4.5.  An overview of the requirements in the Direction 2024 and South Lanarkshire
Council’s approach to addressing these is attached as Appendix 1. 
5. Next Steps and Recommendations
5.1. The requirements of the new Direction 2024 and implications for South Lanarkshire
Council have been reviewed. 
5.2. The Improvement Unit in conjunction with officers across the Council has started
work to ensure that these implications for South Lanarkshire Council are addressed
before reporting the performance results and publications for financial year
2025/2026. 
5.3. We will continue to assess the performance information published by the Council
and make refinements and improvements as necessary. Including:- 
 performance-related reports and updates which are included in committee
papers, could be extracted and summarised on the performance pages of the
Council’s website, making them more accessible for customers, citizens and
partners  
54

Page 55

 more annual reports prepared and uploaded onto the Council’s website by
Resources/Services could be identified and listed/signposted on the website’s
performance pages 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
4 March 2025 
Link(s) to Council Values/Priorities/Outcomes
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
55

Page 56

Appendix 1
Requirements in the Direction 2024 and South Lanarkshire Council’s approach to addressing
these: 
Direction 2024  South Lanarkshire Council’s Approach
- For 2025/2026, 2026/2027, 2027/2028
reporting 
Each council will report information about
its performance in a way that enables that
council, other councils, the Accounts
Commission, local residents and
communities, and any other interested
parties to draw comparisons and make
judgements in relation to: 
i) that council’s performance over time,
(at least 3 years) and 
ii) the performance of different councils in
a given period of time. (councils and
data must be comparable and
complemented by narrative context,
where appropriate) 
The Commission expects councils to
maximise the use of the Local Government
Benchmarking Framework (LGBF) as a
primary means of facilitating comparisons,
alongside or in conjunction with other
locally appropriate measures of
performance. Councils should be
transparent as to why specific measures
have been chosen for local benchmarking
and performance reporting purposes,
particularly where they have chosen not to
use LGBF indicators. 
In satisfying the requirements set out in
this Schedule, the Commission requires
each council to ensure that its reporting
meets the following three criteria: 
• Balanced: both improving and declining
performance 
• Timely: annual performance info should
be published with 9 months and no later
than 12 months after the year end.
Councils should be updating and 
The Public Performance Reports (web content) will
continue to publish trend performance information,
with comparisons, where appropriate, and the LGBF
results, to report performance to the public. 
Also, South Lanarkshire Council (SLC) is always
looking to see what other performance info is
published by Resources/services, so that it can be
linked to the Performance pages on the website. 
The Commission is clear that it is for councils
themselves decide what information they draw upon
from the LGBF. SLC reports on a strategic sub-set of
measures linked to the Council Plan Outcomes,
available in SLC LGBF Dashboard. In addition all of
the LGBF indicators are reported locally in either
Resource Plans, Annual Performance Spotlights
(APSs), Public Performance Reports (PPRs)  or to
Committee and also the full results report on the
website.
New for 2023/2024 – Dashboard and Results to be
updated mid-way through the following year to reflect
additional results released since the first publication
date in March. 
• Continue to show good and poor (to be improved!)
performance results in APSs -> balanced
reporting. In 2023/2024 we published an Areas for
improvement page on the website to supplement
the Annual Performance Spotlights to show the
council’s improvement journey (as suggested by in
the Annual Audit Report 2024) 
• Timely: Annual Performance Spotlights are
published 6 months after financial year end, with
full PPR material being available by 31 March (12
month) deadline.
56

Page 57

reviewing information on their
performance on a quarterly basis (or
otherwise as determined by data
availability or reporting cycles), and
where possible making that information
public. 
• Accessible: able to be easily understood
by all citizens eg: publish summaries to
communicate key messages and make
appropriate use of technology to display
performance information in a variety of
formats 
The ‘quarterly’ issue is satisfied in SLC:
Connect progress reports are prepared, monitored
and reported to committee and published on the
council’s website every 6 months (at Quarter 2 and
Quarter 4). 
Resource Plan progress reports are prepared and
monitored internally on a quarterly basis. Quarter 2
and 4 reports are presented to individual Resource
Committees. (within Committee papers) 
• Accessibility – Digital First approach using
internet/web content and social media. (Web
content can be accessed via any device which
supports internet browsing, including tablets and
smartphones)
Councils’ performance information reporting shall cover the four key areas whilst taking
cognisance of current statutory guidance on Best Value 
1: Using resources effectively to
address strategic priorities 
Councils’ performance reporting should
highlight the impact of activities that are
relevant to the priorities and objectives
articulated in their council plan (or
equivalent).
Key indicators should be identified with set
targets against which performance can be
measured and progress reported.
Where performance info indicates progress
is NOT on track, explanatory narrative
including mitigating actions and timescales
should be included.
South Lanarkshire Council already publish:
• Performance pages on the Council’s website,
including
• Public Performance Reports (PPRs) – service
delivery areas plus Direction-specific topics
• Annual Performance Spotlights (APSs) – aligned
to Connect Outcomes
• Connect Quarter 2 and Quarter 4 reports:
measures, results and progress aligned to
Connect Outcomes
• Resource Plans progress (to Committees) at
Q2/4: measures, results and progress aligned to
Connect Outcomes 
• Full suite of LGBF results on the website:
grouped by LGBF service area 
• LGBF SLC dashboard of strategic indicators 
2: Working with partners and
communities to achieve shared
outcomes 
Recognising the statutory role of councils
in relation to community planning councils’
performance reporting should show how
they and their community planning partners
are working together to address the
priorities, targets and actions set out in
their local outcomes improvement plans
(LOIPs) and locality plans. 
Aligning their performance reporting with
these plans should show how council
actions are contributing to the delivery of
locally agreed shared outcomes. 
SLC has a specific PPR Working with communities
Also, the Community Empowerment Team publish an
annual report outcomes improvement report 
Community Planning Partnership (CPP) Annual
outcome improvement report on their own website. 
The CPP Manager confirmed that the requirements
listed in the new Direction are covered in information
published on the CPP website and we can signpost to
Performance pages on SLC’s website 
57

Page 58

Where performance info indicates progress
is NOT on track, explanatory narrative
including mitigating actions by the council
and/or its partners and timescales should
be included. 
3: Financial sustainability and budget
transparency 
Elected members and local communities
should be able to understand their
council’s overall financial position and the
choices it must consider when setting a
budget.
Councils should publish information
pertaining to relevant indicators –
particularly those in the LGBF – that
enables comparative assessment of
key aspects of their current and future
financial position.
Councils should also be able to provide
information requested by the Commission
to inform its reporting on councils’ financial
sustainability.
This is a new requirement in the Direction 2024. 
Discussions have begun with Finance (Strategy) and
the plan is to create web content using the budget
reports and Committee papers prepared annually for
this exercise plus the LGBF indicators.
4: Use of data and assessments to
support improvement and
transformation 
Councils should be able to demonstrate
how they are assessing and interpreting
data about their performance and using
that analysis to inform decision-making and
any required transformation of service
delivery.
Councils should carry out self-assessment
and make use of third-party feedback
mechanisms and opportunities to learn
from others (such as peer review), to
evaluate their own performance over time
and relative to other councils and identify
factors contributing to that performance as
well as opportunities for improvement. 
Councils should also show how they are
using and responding to the findings and
recommendations arising from any self-
assessment work, audit assessments,
reviews undertaken by other scrutiny or
inspection bodies, and engagement with
service users, to drive continuous
improvement in the context of resource
constraints – as part of their duty to secure
best value. 
This was introduced in Direction 2021 for which SLC
created a new PPR Assessment and review 
There is much Transformational work happening
across SLC’s Resources and is this included in the
above PPR report. 
From 2024/2025 the corporate Transformational
programme is being publicly reported via PRSF
reports. The plan will be to summarise the salient
information from reports included in the existing
Assessment and review PPR which has a
Transformation section. 
Reference to SLC’s annual Self-assessment horizon
scanning exercise is included on Improvement and
how we compare page. 
There is a link under Other performance information
taking web visitors to the Complaints performance
page, which includes  a summary of some of the ‘You
said, we did’ stories for the year 
58

Page 59

Accounts Commission
Statutory Performance
Information Direction 2024
Foreword by the Chair of the Accounts Commission
I am pleased to present this latest version of the Accounts Commission’s
Statutory Performance Information (SPI) Direction, which takes effect
during a critical period for local government. A combination of ongoing
financial constraints, growing demand for services, workforce challenges
and a complex policy landscape is continuing to put councils under
extreme pressure, forcing them to make difficult decisions about how
services are delivered, including the need for transformation.  
In this context, clear, balanced and effective reporting to the public on how
well services are performing has never been more important, enabling
citizens to understand the reasons behind decisions that can have a
significant impact on their lives. The better informed people are, the more
they feel able to engage in the decision-making process.
The Commission has a statutory duty to direct councils to publish
information that will:
• enable comparisons of performance between councils and over
time, and
• show how well they are improving local outcomes with community
planning partners in their area.
Complying with the SPI Direction is fundamental to councils fulfilling their
duty to secure best value – a duty that focuses on improving lives and
services for local people alongside using resources effectively. The
Direction reinforces the importance of councils being transparent through
reporting to their local communities on how well they are meeting this duty.
Rather than prescribing in detail the information councils should publish,
we remain fully supportive of a sector-led approach to benchmarking and
improvement. Developed for and with councils, indicators from the Local
Government Benchmarking Framework (LGBF) should be used, as this is
the most effective and comprehensive means of enabling comparisons to
be drawn by councils themselves and by the public. 
Appendix 2
4
59

Page 60

Accounts Commission Statutory Performance Information Direction 2024 | 2
We recognise that each council has its own strategic priorities, determined
in accordance with local needs and appropriate data, and we expect these
priorities to guide decisions about use of resources. We understand that
the choices made by councils will impact on performance across a range
of areas. How councils plan for, manage and report on these impacts is a
key area of focus in our audit work, particularly on best value. 
Information on performance over time and in comparisons to others is a
crucial tool for continuous improvement and transformation. Through their
public performance reporting, councils should be able to demonstrate:
• how they are working with partners to achieve shared local
outcomes, 
• how they are responding to the needs of their local communities, 
• how they are learning from best practice elsewhere, 
• what factors are impacting on their performance 
• how they are using data to inform decision-making, and
• how they measure success. 
Councils being clear and transparent in this way will help communities to
understand the reasons for changes in the delivery and performance of
local services.
In developing this version of the SPI Direction, we have consulted a range
of stakeholders and reviewed evidence about councils’ performance
reporting collected through our best value audit work. We have heard that
the Direction continues to be highly valued across local government as a
statutory underpinning of existing approaches but also that councils want
more clarity about what is expected of them and how to ensure they are
complying. 
For that reason, while it remains generally high-level in nature, we have
sought to make the requirements in this new Direction clearer and more
specific. I hope these revisions are helpful. We will review how this
Direction operates in practice no later than the third year in which it
applies, and we would welcome any feedback either as part of this review
process or via our audit colleagues. 
Jo Armstrong
Chair, Accounts Commission
December 2024  
60

Page 61

Accounts Commission Statutory Performance Information Direction 2024 | 3
Local Government Act 1992: The Publication of Information
(Standards of Performance) Direction 2024 
1.  This Direction is given by the Accounts Commission for Scotland (“the
Commission”) under section 1(1)(a) of the Local Government Act
1992, which requires the Commission to direct relevant bodies to
publish such information relating to their activities in any financial year
or other specified period as will, in the Commission’s opinion: 
“facilitate the making of appropriate comparisons (by reference to
the criteria of cost, economy, efficiency and effectiveness and of
securing best value in accordance with section 1 of the Local
Government in Scotland Act 2003) between – 
i) the standards of performance achieved by different relevant
bodies in that financial year or other period; and 
ii) the standards of performance achieved by such bodies in
different financial years or, as the case may be, other periods.” 
2.  Such information is also to facilitate the drawing of conclusions about
the discharge of those bodies' functions under the Community
Empowerment (Scotland) Act 2015 (in essence, carrying out
community planning for the “improvement in the achievement of
outcomes”). 
3.  This Direction is given to all local authorities, as defined by the Local
Government (Scotland) Act 1973, and amended by the Local
Government etc. (Scotland) Act 1994.
4.  Each local authority shall, in accordance with section 13 of the Local
Government in Scotland Act 2003 and associated regulations and
guidance from Scottish Ministers, publish the information specified in
the Schedule to this Direction for all activities which are carried out by
the body.
5.  The periods for which the information in the Schedule must be
published are the financial years beginning 1st April 2025, 2026 and
2027.
6.  Local appointed auditors will assess the adequacy of councils’
arrangements for meeting the requirements set out in the Schedule to
this Direction as part of their annual audit work. 
7.  Audit findings from this work will be used to inform the Controller of
Audit’s reporting to the Commission on the extent to which individual
local authorities are meeting their duty to secure best value – in
particular, their obligations in relation to use of resources, continuous
improvement and public performance reporting.  
61

Page 62

Accounts Commission Statutory Performance Information Direction 2024 | 4
Schedule
1.  Each council will report information about its performance in a way that
enables that council, other councils, the Accounts Commission, local
residents and communities, and any other interested parties to draw
comparisons and make judgements in relation to: 
i) that council’s performance over time, and
ii) the performance of different councils in a given period of time.
2.  For the purposes of (i) above, reporting against a particular indicator or
set of indicators should include a time series that is appropriate for the
particular indicator/s chosen, typically covering a period of at least
three years but taking account of:
• internal factors such as council plans and other strategic or budget
decisions, and 
• external factors such as national policy changes and any
extraordinary events.
3.  For the purposes of (ii) above, councils should ensure:
• comparisons are made against councils that are similar in relevant
respects, such as budget size, urban/rural classification, and
demographic or socioeconomic characteristics, and
• their choice of indicators – including whether they have adopted
LGBF or other indicators or a combination – and their performance
data are robust, consistent and comparable, and complemented
by narrative context where appropriate.
4.  The Commission expects councils to maximise the use of the Local
Government Benchmarking Framework (LGBF) as a primary means of
facilitating comparisons, alongside or in conjunction with other locally
appropriate measures of performance. Councils should be transparent
as to why specific measures have been chosen for local benchmarking
and performance reporting purposes, particularly where they have
chosen not to use LGBF indicators.
5.  In satisfying the requirements set out in this Schedule, the
Commission requires each council to ensure that its reporting meets
the following three criteria: 
• Balanced, in respect of areas in which performance has improved
and those in which it has not improved or has declined. It is
important to avoid reporting in a way that is, or could reasonably
be perceived as being, selective, misleading or biased.
• Timely, in the interests of transparency and to enable the council
to respond promptly where remedial action is required. It should
be possible for councils to publish an annual performance report
62

Page 63

Accounts Commission Statutory Performance Information Direction 2024 | 5
within nine months – and no later than twelve months – after the
end of the respective year. In addition, councils should be updating
and reviewing information on their performance on a quarterly
basis (or otherwise as determined by data availability or reporting
cycles), and where possible making that information publicly
available. 
• Accessible, and able to be easily understood by all citizens. For
example, councils should publish summaries to communicate key
messages, produce easy-read versions of reports wherever
possible, and make appropriate use of technology to display
performance information in a variety of formats whilst adhering to
statutory requirements in relation to equalities. 
6.  Councils’ performance information reporting shall cover the four key
areas set out in the remainder of this document. In meeting these
requirements, councils should take cognisance of current statutory
guidance on Best Value.
1: Using resources effectively to address strategic priorities
7.  Councils’ performance reporting should highlight the impact of
activities that are relevant to the priorities and objectives articulated in
their council plan (or equivalent). This includes indicators specified in a
performance management framework, and any other information or
activity that is relevant to addressing the council’s priorities or fulfilling
its statutory duties.
8.  Councils should identify key indicators and set targets against which
their performance in addressing their priorities and achieving their
objectives can be measured, and report on their progress towards
reaching those targets. 
9.  In doing so, councils should be able to demonstrate how the priorities
they have set are driving decision-making about their use of resources
and in turn how those decisions are impacting on performance in
different areas – over time and relative to other councils. 
10.  Where performance information shows that a council is not on track to
achieve a particular target or objective, the council should explain the
factors that have contributed to this, and what actions it is taking to
respond and improve its performance in that area, including an
expected timeframe for that improvement.
2: Working with partners and communities to achieve shared
outcomes
11.  Recognising the statutory role of councils in relation to community
planning, councils’ performance reporting should show how they and
their community planning partners are working together to address the
63

Page 64

Accounts Commission Statutory Performance Information Direction 2024 | 6
priorities, targets and actions set out in their local outcomes
improvement plans (LOIPs) and locality plans.
12.  Aligning their performance reporting with these plans should show how
council actions are contributing to the delivery of locally agreed shared
outcomes.
13.  Where a target is not on track to be met, the council should explain
any factors that may have contributed to this, and what actions are
being taken by the council and/or its partners to improve performance
in that area, including an expected timeframe for that improvement.
3: Financial sustainability and budget transparency
14.  It is vital for elected members and local communities to be able to
understand their council’s overall financial position and the choices it
must consider when setting a budget, and the subsequent impact of
the decisions the council makes.
15.  Councils should publish information pertaining to relevant indicators –
particularly those in the LGBF – that enables comparative assessment
of key aspects of their current and future financial position.
16.  Councils should also be able to provide information requested by the
Commission to inform its reporting on councils’ financial sustainability.
4: Use of data and assessments to support improvement and
transformation
17.  Councils should be able to demonstrate how they are assessing and
interpreting data about their performance, and using that analysis to
inform decision-making about their use of resources and any required
transformation of service delivery.
18.  Councils should carry out self-assessments, and make use of third-
party feedback mechanisms and opportunities to learn from others
(such as peer collaborative improvement), to evaluate their own
performance over time and relative to other councils, and identify
factors contributing to that performance as well as opportunities for
improvement.
19.  Councils should also show how they are using and responding to the
findings and recommendations arising from any self-assessment work,
audit assessments, reviews undertaken by other scrutiny or inspection
bodies, and engagement with service users, to drive continuous
improvement in the context of resource constraints – as part of their
duty to secure best value. 
64

Page 65

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 1 April 2025
Report by: Chief Executive  
Subject: Accounts Commission's New Approach to the Audit of
Best Value – Comhairle nan Eilean Siar, Fife, East
Renfrewshire 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Forum of key messages and recommendations from recent reports
published under the Accounts Commission’s new approach to auditing Best
Value
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the key messages and recommendations within the report be noted.
[1recs]
3. Background
3.1. Towards the end of 2023, the Accounts Commission introduced a new approach to
the Audit of Best Value to replace the Best Value Assurance Report (BVAR) regime
which had run from 2018 to 2023. 
3.2. The approach consists of brief Controller of Audit (CoA) reports accompanied by and
reflecting on published annual audit reports. These CoA reports are considered by
the Commission in public and reported publicly. 
3.3. The CoA reports are intended to offer a BV-focused reflection on the Council’s
annual audit report.  In line with the previous practice of bringing BVAR findings to
the Forum to highlight good practice and place our own activities in context, the
findings from the recent CoA reports are summarised below. 
4. Comhairle nan Eilean Siar (published 26 February 2025)
4.1. The report for The Comhairle focuses on its workforce planning and the link to
performance and other strategic and operational plans.  Auditors note that there
needs to be greater alignment between plans and monitoring and reporting
arrangements need to be strengthened. 
 The Comhairle has just over 2,000 employees, more than half of whom are over
45 years old. Given the projected decline in working age population in the
Western Isles, workforce planning will be a huge challenge.  
5
65

Page 66

 The Comhairle’s Corporate Workforce Plan 2023-2027 draws upon an
extensive range of workforce and demographic data. However, it does not
clearly set out the Comhairle’s overarching outcomes for its workforce or
explicitly link with other key strategies and plans. The Comhairle did not engage
with employees or Trades Unions when developing the plan, partly due to local
representatives not being in place.
 The Comhairle is at the early stages of digital adoption compared to other
councils. The cyber-attack is providing an opportunity to update its systems and
processes. The Comhairle needs to demonstrate workforce benefits and
productivity gains made through the use of digital technology.
 Around 50 per cent of the Comhairle’s office-based staff work in a hybrid
manner. The Comhairle is exploring the impact of hybrid working on employee
wellbeing through its employee survey. There is scope for its relationships with
Trades Unions to develop.
 The Comhairle has adopted a wide range of approaches to address its
workforce challenges, including a well-established apprenticeship programme
that demonstrates positive outcomes.
 The Comhairle has some formal arrangements in place for sharing services
with partners to create workforce benefits. It is limited in sharing services with
other councils by its commitment to employing people living in the Western Isles
to ensure a sustainable population.
 The Comhairle has developed both corporate and service-level action plans for
workforce planning. Annual monitoring is in place at corporate level but the
monitoring and reporting of progress against service-level action plans could
improve. It has not set out how it intends to assess its overall performance in
workforce planning and what metrics it will use. 
4.2. The Commission puts forward the following action points for Comhairle nan Eilean
Siar:- 
 The Comhairle should ensure its Corporate Workforce Plan aligns with its key
strategies and plans and sets out explicitly how workforce planning will support
it achieve its strategic priorities.
 The Comhairle should develop corporate-level strategic workforce planning
outcomes, linked clearly to its action plan, to demonstrate a clearer
understanding of how the actions it is taking forward are contributing to its
strategic vision for its workforce.
 The Comhairle should ensure that priorities and actions from the Corporate
Workforce Plan are reflected in the next round of its service workforce plans in
addition to service-specific actions. It should provide more guidance and/or
tools to support services develop service workforce plans.
 The Comhairle should demonstrate and quantify what workforce benefits and
productivity gains are made through its use of digital technology.
 The Comhairle should put plans in place to support the development of its
relationship with Trades Unions.
 The Comhairle should ensure that the actions from the Corporate Workforce
Plan 2023-2027 and the Organisational Development Strategy 2024-2030 are
clearly aligned.
 At corporate level, the Comhairle should set out how it intends to assess its
performance and what metrics it will use to measure the impact of its workforce
planning and initiatives.
 The Comhairle should set out its arrangements for monitoring and reporting on
progress against actions in and across service-level workforce plans. 
66

Page 67

5. Fife Council (published 25 February 2025)
5.1. Fife Council received a mixed report, with strengths in its approach to its workforce
and its culture of cross-party working.  Auditors identified a number of significant
challenges impacting on the council’s finances and highlighted the need for these
challenges to be taken into account in financial plans. 
 Fife Council has demonstrated competent financial management over the years
and has achieved a positive outturn position without having to make significant
savings. But the council has reached a turning point and is now managing
significant in-year pressures and forecasting a cumulative gap of £46.5 million
by 2027/2028. The Commission was particularly concerned about a number of
issues highlighted in the annual audit report, including:- 
 The Fife Strategic Assessment shows that the region continues to face key
challenges including worsening inequalities; and slowing performance
improvement has been identified in areas such as children’s services and
adult social care despite limited savings.
 There were large overspends in Fife’s Integration Joint Board (IJB) in
2023/2024 and the same is being projected for 2024/2025 due to ongoing
and increasing demand-driven spend.
 The Housing Revenue Account is under pressure with urgent plans now
required, in consultation with tenants, to meet financial gaps and enable
future investment in much needed affordable housing.
 Significant levels of reserves were utilised in 2023/2024, and uncommitted
general fund balances dipped below the council’s rolling three-year target
of two per cent. 
These issues will continue to impact the council’s finances, so it is now critical for its
Medium-Term Financial Strategy to set out how it will respond. 
 The council is demonstrating awareness of these issues and the work it must
do in partnership to address not only the ambitions in the ‘Plan for Fife’, but the
immediate service pressures in areas like health and social care. All services
are now preparing three-year change plans (due by end March 2025) focused
on longer-term financial sustainability. The Commission regards these plans as
especially important in providing clear evidence that the right leadership, culture
and capacity (including in relation to digital) are in place to significantly
accelerate the scale and pace of delivering the transformation and change now
required. The Commission expects the council’s Medium-Term Financial
Strategy to be updated to take into account the impact of the change plans, and
to provide transparency about future intended use of reserves.
 The Commission is encouraged to see improvements in performance reporting
arrangements in response to challenging audit recommendations in 2022/2023.
The next key step is robust evidence of how the council is using this improved
reporting framework to drive continuous improvement. The council should
evidence that its new change plans are having a positive impact on services
performance and outcomes for communities.  
67

Page 68

 The Commission welcomes the minority party’s leadership in fostering the joint
arrangements required to make effective decisions. As well as a range of
structures to support strong cross-party working, mandatory training has been
developed for elected members to support their work on boards and
committees. A range of tools and techniques are embedded to engage with
communities, including area committees and well-established processes around
community asset transfer, although further work is needed to encourage and
support groups to manage assets in the most deprived areas. The council will
need to ensure that these engagement structures support meaningful
conversations between elected members and communities on the challenging
fiscal reality, ensuring that they are equipped and able to take the tough
decisions that lie ahead and implement the necessary service changes that
have been delayed up until now.
 The council should be commended for innovative work in relation to its
workforce, much of which is driven by recruitment, retention and capacity
challenges. Its ‘Life Chances’ model (focused on employability and poverty
reduction), apprenticeships, ‘Grow your Own’ schemes (in areas like
environmental services), and a focus on flexible working and wellbeing are all
initiatives that should be shared with other councils. While processes are in
place for tracking implementation of its workforce strategy, the Commission
expects evidence of regular reporting to be prioritised to measure the impact of
initiatives and maintain a focus on continuous improvement. 
5.2. The Commission puts forward the following action points for Fife:- 
 The council should identify the neighbourhood plans for priority areas that it
intends to complete and a timetable for this work.
 The council should extend its improvement methodology on raising educational
attainment in deciles 1-3 to a broader range of young people.
 The framework for managing performance against the Plan for Fife should be
finalised as early as possible.
 The council should develop a range of delivery plans to support the identified
actions and wider ambitions outlined in the Plan for Fife. These actions should
be measurable, with clear deadlines.
 The council should continue its new approach to managing sickness absence
rates.
 The council should work with Fife Health and Social Care Partnership (FHSCP)
and NHS Fife to accelerate the redesign of adult health and social care services
and mitigate medium-term financial pressures.
 As a partner in the FHSCP, the council should seek early agreement over roles
and responsibilities, so that the management and governance arrangements of
the FHSCP support the significant service redesign challenges it faces.
 The council’s new programme board should ensure alignment between the
aims of the Plan for Fife and service change plans. It should develop a focus on
outcomes rather than being led by budget changes. 
6. East Renfrewshire Council (published 06 February 2025)
6.1. East Renfrewshire received a positive report, with particular mention being made of
good practice in cross-party working, budget planning, and community engagement. 
Auditors commend the council for strong Local Government Benchmarking
Framework (LGBF) performance and a data-driven and focused approach to
transformation.  
68

Page 69

 The Commission is impressed by the consistently strong performance of East
Renfrewshire Council across a broad range of corporate and service areas,
against the context of recent leadership changes. Notable examples of good
practice include cross-party working, budget scenario planning (despite single
year settlements), relationships with health and other key partners, community
engagement, strategic planning and performance management. This is a good
example of a small urban council delivering high-quality services to its
residents, despite financial constraints.
 The council has the building blocks in place in relation to long-term financial
planning – early engagement with communities, a cross-party budget strategy
group (including a representative from its Integration Joint Board (IJB)),
identification of challenges, budget scenario planning and outline revenue
financial plans up to 2030. The Commission would now expect to see the
council develop detailed income and savings plans for the years ahead to
ensure the council can meet its strategic objectives. Tough decisions linked to
transformation now need to be taken to secure the council’s financial
sustainability over the longer term.
 The Commission notes the prudent approach to financial management adopted
by the council. The Commission is keen to see further work on in-year budget
monitoring to ensure elected members get the most accurate and timely
information, including in relation to additional income sources, to support them
in making key decisions during the year.
 The council has taken an incremental approach to the transformation of service
delivery over recent years, including through its digital transformation
programme and investment in data analysis. This analysis has enabled a
deeper understanding of East Renfrewshire’s communities and has allowed
services to be targeted towards the most vulnerable. Given its size and scale,
likely future demand and Commission findings 5 financial constraints, the
council will need to build on its strong track record and relationships with the IJB
and community planning partners to drive the innovation and scale of change
required in its next phase of transformation.
 The Commission is particularly encouraged to see that the council’s
performance is extremely strong, even when compared to other similar councils
in its Local Government Benchmarking Framework (LGBF) ‘family group’. This
includes performance in key areas like education, emissions, hospital
admissions and affordable housing. The impact of financial challenges and
savings plans including within the IJB will need to be monitored closely, and the
council and IJB will need to ensure it fully understands the impact on outcomes
for service users.
 In relation to its workforce, the council has taken proactive steps including a
refreshed People Strategy and workforce planning approach, a Health and
Wellbeing programme, and benchmarking against other Scottish councils in
relation to its hybrid working policy. Despite these initiatives, the Commission is
concerned about the low response rates to the staff wellbeing survey. Given the
importance of having an engaged workforce, the Commission expects the
council to continue to use key metrics such as absence rates and turnover to
monitor and scrutinise employee engagement, ensuring a return on its
investment and a positive impact on staff.  
69

Page 70

6.2. The Commission puts forward the following action points for East Renfrewshire:- 
 The council should continue its development of a realistic and costed medium-
term financial plan that supports the delivery of strategic objectives while
recognising significant future uncertainty
 The Council should consider how best to broaden awareness of key workforce
planning issues to elected members.
 The 2025/2026 budget process needs to address the funding of the digital
transformation programme.
 Performance discussions are a critical process for any organisation to ensure
that employees continue to fulfil their roles effectively and develop throughout
their career. The Council should take steps to improve participation rates and
value of Quality Conversations across the Council.
 The Council must take steps to increase the response rate to the employee
survey. 
7. Next steps and recommendations
7.1. Officers of the Council will continue to review the Controller of Audit reports as they
are published to learn any lessons for the council. Reports on any significant findings
and key messages will be brought to the Forum for information. 
8. Employee Implications
8.1. There are no direct employee implications. 
9. Financial Implications
9.1. There are no direct financial implications. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
11. Other Implications
11.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
12.2. There is no requirement for consultation on the content of the report. 
Paul Manning
Chief Executive 
5 March 2025  
70

Page 71

Link(s) to Council Values/Priorities/Outcomes
• Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
71

Page 72

72

Page 73

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 1 April 2025
Report by: Executive Director (Finance and Corporate
Resources)  
Subject: Transformational Reviews – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Transformational Reviews that are part of the Council’s
Transformational Change Programme for the year 2025/2026 and beyond 
2. Recommendation(s)
2.1. The Performance and Review Scrutiny Forum is asked to approve the following
recommendation(s):- 
(1) that the update on the Transformational Reviews be noted.
[1rec
3. Background
3.1. In June 2024, a report titled 2025/2026 to 2027/2028 Revenue Budget Strategy was
presented to the Executive Committee. This report highlighted the need for
Transformational Change to manage the significant Budget Gaps facing the Council
over the next 3 years.  The Transformational Change Programme drives continuous
improvement as well as efficiencies and feeds into the Budget Strategy to deliver
savings for 2025/2026 to 2027/2028. 
3.2. An initial paper titled, Cross-Cutting Reviews – Update, was presented to the
Performance and Review Scrutiny Forum on 27 August 2024. As a result of these
reviews, savings totalling £2.680 million were approved by Council on 26 February
2025 as part of the 2025/2026 budget setting process. These are summarised in Table
1. 
Table 1: Cross-Cutting Savings 2025/2026
Saving Reference Saving Proposal
Saving Value
Approved
(£m)
M&O01 Procurement 0.941
M&O02 Overtime 0.364
M&O03 Management Structures 1.000
COR01 Council Charges 0.375
Total  2.680 
6
73

Page 74

3.3. Updates to this forum on 19 November 2024 and 04 February 2025 detailed the
progress of these Cross-Cutting reviews as well as Resource specific
transformational reviews, to identify savings in the year 2026/2027 and beyond. This
report provides a further update to these Cross-Cutting reviews (Section 4) and
Resource specific reviews (Section 5). 
4. Transformational Change Programme: Cross-Cutting Transformational Reviews
4.1. Each review is taken in turn with a summary of their current status. 
4.2. Charging: The following proposals were consulted upon as part of the budget
consultation and agreed by the full Council on 26th February 2025, delivering a saving
of £0.375 million for 2025/2026.   
4.3. Since the last report to this Forum, the outcome of the budget consultation was
reviewed, and the charges are now set, based on the approved saving (section 4.2). 
Moving forward, it is envisaged that non–statutory charges will be increased by year-
on-year annual inflation and presented to members as part of the Budget process. 
4.4. While this review has substantially concluded, Services will continue to report on any
further identified charging opportunities outwith this Charging review and the findings
will be presented to this Forum as they become available. This may involve identifying
opportunities for new charges in future years. 
4.5. One area specifically being pursued by Finance (Transactions) is the accepted
payment methods for charges (e.g. the removal of cheques).  Finance (Transactions)
will review payment methods as part of the Customer Engagement review. 
4.6. Procurement: Following the Council’s approval of procured spend savings totalling
£0.941 million in the 2025/2026 Budget, this review remains ongoing to ensure the
maximum level of efficiencies is delivered and to identify cashable budget savings. 
4.7. Three opportunities totalling £0.285 million have been identified to date: 
Area of Opportunity
Efficiency
Saving
(£m)
Purchase Card Rebate
a collaborative contract to increase the rebate percentage available on
transactions for all Scottish councils using purchase cards
0.055
Homeless Property Cleaning
an opportunity to transfer the cleaning for homeless void properties from
the current supplier to the Council’s contracted cleaning supplier at a more
competitive rate
0.090
Housing Property Cleaning and Clearance
a new contract with improved commercial terms for the cleaning and
clearance of housing void properties
0.140 
Total 0.285 
4.8. In addition, a pilot phase trialling a new supplier of two-wheeled bins for plastic and
glass has commenced, with the opportunity to deliver £0.060 million savings per
annum. Bin performance will be monitored for up to a year and a recommendation will
be made following the conclusion of the pilot.  This review is ongoing, and any updates
will be provided to the Performance and Review Scrutiny Forum as the review
progresses. 
74

Page 75

4.9. Overtime: This review of overtime practices and spend will look to reduce expenditure
and remove / reduce associated risks to employees.  Following the Council’s approval
of savings totalling £0.364 million for the 2025/2026 budget, the agreed budget
reductions will be implemented, and this review will remain ongoing to identify further
savings opportunities for 2026/2027 and beyond. This includes a focus on looking to
reduce the need for overtime though recruitment, and also consideration on out of
hours service requirements. 
4.10. Revised overtime information packs are being circulated to Resources on a four-
weekly basis to support the progress and delivery of Resource Overtime Action Plans. 
Any updates will be reported to the Performance and Review Scrutiny Forum as they
become available. 
4.11. Organisational and Management Structures: This is a review to ensure correct
balance between management and the staff they oversee. This review refers to the
Organisational Structure Models which were agreed and implemented formally in
2009/2010 and considers how closely aligned the current structures are to the agreed
preferred operating models (POM). The 2025/2026 savings pack contained a proposal
to increase the spans of control for these service areas and generate savings totalling
£1.000 million.  This was approved by the Council on 26 February 2025. 
4.12. This review is ongoing in order to identify further savings opportunities for 2026/2027
and beyond. Phase 2 of this exercise will look to identify further savings in both Grade
4 and above posts within structures that do not meet the POM requirements and in
any layers/tiers that can be streamlined as per the POM. Work on Phase 2 has
commenced and outcomes are expected by the summer. Implementation timeframes
will be considered as part of the Review. Any updates will be reported to the
Performance and Review Scrutiny Forum as they become available. 
4.13. Fleet: This review sets out the Fleet principles that Services should consider as part
of their ongoing workstreams in order to lower operational expenses and extend the
lifespan of vehicles. A Terms of Reference detailing the scope and outcomes of this
review was presented to the Performance and Review Scrutiny Forum on 27 August
2024. Work remains ongoing to consider the number of vehicles used by Resources
and rightsizing the Council’s fleet and an update on this work will be presented to this
Forum on 17 June 2025.   
4.14. Digital Transformation: This review of the use of technology impacts on all Reviews
and focuses on how the Council and its customers interact. Three key areas are being
considered: 
 Business Systems & Processes: projects and improvements to key corporate and
line of business applications.
 Workforce Productivity: focus on enabling and empowering staff to maximise their
effectiveness and digital literacy.
 Customer Engagement: clear & consistent Council-wide customer engagement.  
75

Page 76

4.15. An action plan has been developed covering several related streams, to ensure that
work is progressed in parallel where feasible.  In addition, work is progressing to form
a Digital Transformation team within the IT Service with a range of expertise and skills. 
A new activity has also commenced to aid a more rapid approach to delivering change.
Using work done previously by the Digital Office, a draft capability map has been
produced.  This will allow Resources to quickly develop high level designs for change
or new services using ‘building block’ technical or business capabilities which the
Council already has, driving re-use of technology to leverage existing investment. 
4.16. A mid–term review of the Digital Strategy 2022–2027 will be undertaken in 2025 to
further develop the Council's digital vision.  A fuller report will be brought back to this
Forum in June 2025. 
4.17. Customer Engagement: This review is closely aligned with the Digital Transformation
review and will see the development of a Council Customer Engagement Strategy to
improve digital engagement, accessibility and create efficiencies. The review will
identify opportunities for service improvement, cycle time reduction and cost saving
through transformation of customer contact processes in the main customer facing
Resources and will consider the introduction of new technologies and processes to
deliver efficiency-led, customer services and engagement. 
4.18. A working group has been set up comprising representatives from Finance
(Transactions), IT Services, and from each Resource.  The working group has
completed a SWOT analysis and is currently considering the specific actions required
to address the weaknesses and threats. To support this, a risk register has been
completed with top risks and a series of control measures have been identified to
mitigate or reduce the risks.  An update report will be presented to this Forum on 17
June 2025. 
4.19. In–house and Procured Services: A review of the costs of inhouse service provision
compared to the cost of procuring these same services from external marketplace has
now commenced. 
4.20. The Council currently uses external suppliers to deliver works and services. There can
be a number of reasons for external provision, and these can include instances where
it has not historically been best value for the Council to deliver the service internally,
or where there are capacity / capability issues which have limited the Council’s ability
to carry out required service. In addition, there may be situations where the Council is
not permitted/licensed to carry out the Service. 
4.21. Any services contract with a total annual value exceeding £0.250 million and which is
expected to come to an end within the calendar years 2025 – 2027 is currently within
the scope of this review. Resources have been asked to review this expenditure with
suppliers and to give consideration as to what activities have the potential to be
delivered internally by the Council.  Current contract terms as well as factors within the
Resource / Service such as capacity and capability to deliver the service(s) in–house,
will be considered. 
4.22. A Terms of Reference has been prepared for this review and is attached in Appendix
1 for information. This details the extent of the review and what it intends to achieve.
It also includes timescales for delivery.  
76

Page 77

4.23. A flowchart which allows initial consideration of current contracts is attached in
Appendix 2. 
5. Transformational Change Programme: Resource Specific Reviews
5.1. Each review is taken in turn with a summary of their current status. 
5.2. Third Sector Review:  This review will look at the relationship between the Council
and the Third Sector, building on the Council motion on the Keeping the Beat Alive
initiative and the Fair Funding Charter. This will include consideration of the
collaborative relationship between the Third Sector and the Council, building on
current relationships to ensure a continued strong working partnership between the
two.  As part of this review, we will also look to update the internal processes and
guidance for the provision of grants for the Third sector.  A separate report on this is
included in the Agenda pack for this Forum. 
5.3. Factoring: As reported previously, this is a full review of the Factoring Service
currently provided by Housing and Technical Resources to owners of former Council
Housing Stock.  This service is currently provided to 8480 owners within Rutherglen
and Cambuslang, East Kilbride and Hamilton localities. 
5.4. The review is in two phases. The first phase is an examination of the strengths and
weaknesses of the current factoring arrangements, and an appraisal of alternative
service models, taking into account potential changes in the legislative framework and
considering the risks and benefits of each.  APSE have been appointed as a consultant
to assist with the review.  The outcome of this review will be presented to the Housing
and Technical Resources Committee and then on to this Forum for information. 
5.5. The second phase will incorporate consultation with stakeholders and service users
on viable and sustainable options. 
5.6. Long Term Estate Strategy: Previous reports to this Forum have included this review
under the title of ‘Property.’ This review looks to promote a strategic and outcome
focussed methodology to Asset Management with a 10-year Estate Strategy that will
inform and guide future land/property decisions on the investment, rationalisation, co-
location, and disposal of assets, taking account of community, financial and service
considerations. The process of estates assessment will be ongoing and iterative over
the lifetime of the Strategy. 
5.7. The Estate Strategy aims to: 
 effectively support public service delivery in the future and helps us to deliver
people and place-based objectives
 explore opportunities to work collaboratively with other public sector bodies
 inform and guide future land/property decisions on the investment, rationalisation,
co-location, and disposal of assets
 direct investment into a reduced, but higher quality and energy efficient core estate
 facilitate the transition to net zero for our smaller, higher quality estate
 promote community asset transfer where this is appropriate
 help manage the financial pressures facing the Council and South Lanarkshire
Leisure and Culture (SLLC)  
77

Page 78

5.8. Estate development is split into three inter-related phases, where Phase One
comprises an initial data review, and the development of a clear assessment criteria.
Using the criteria noted by the PRSF in August 2024, the main output from Phase One
will be an initial scoring of all properties within the estate.  Phase Two utilises the data
gathered in phase one and explores and identifies potential funding sources that could
fund aspects of delivery, alongside alignment with internal capital budgets. It will create
a prioritised real estate/project pipeline against each potential funding source, based
on availability and achievability. Phase Three comprises the development of the Estate
Strategy and an associated 10-year Delivery plan, which will aim to address the
requirements discussed above. 
5.9. An interim update on this review was presented to the Executive Committee on 12
March 2025. 
5.10. South Lanarkshire Leisure and Culture (SLLC) Commissioning Plan: This review
addresses the need for clarity in terms of the relationship between the Council and
SLLC, and its role as a provider of services to the Council. This need for clarity has
been further exacerbated in recent years given the financial challenges faced by both
the Council and SLLC, and it is therefore vital that consideration is given to a longer-
term, more sustainable approach to how the Council and SLLC work together. 
5.11. A progress update was presented to the Executive Committee on 12 March 2025 and
the draft commissioning plan can be viewed here. 
5.12. Property Services – Efficiencies and Income Generation: This review is focussed
on identifying areas of efficiencies and income opportunities across Assets and
Estates, Consultancy Services and Building Services.  Running costs, performance of
workstreams, fleet assessment, depot locations and renewable technology are being
considered as part of this review, in addition to consideration of management and
organisational efficiencies alongside the Personnel led review noted earlier in this
report.   An update report will be presented to this Forum on 17 June 2025. 
6. Employee Implications
6.1 There are no direct employee implications from this report. 
7. Financial Implications
7.1. The financial implications are summarised within the report. 
8. Other Implications
8.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources. The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
8.2. The main risk associated with the Council’s Capital Programme is that there is an
overspend. The risk has been assessed as low given the detailed project management
plans prepared and monitored for each project. The risk of an overspend is managed
through four weekly Investment Management Meetings.  
78

Page 79

8.3. There are no implications for sustainability in terms of the information contained in this
report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
4 March 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 26 June 2024
 Cross-Cutting Reviews – Update – Performance and Review Scrutiny Forum 27 August
2024 
 Transformational Reviews – Cross-Cutting – Update – Performance and Review Scrutiny
Forum 19 November
 Transformational Reviews - Update – Performance and Review Scrutiny Forum 04
February 2025 
List of Background Papers
 2025/2026 to 2027/2028 Revenue Budget Strategy 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601  (Tel: 01698 452601)
lorraine.o'hagan@southlanarkshire.gov.uk 
79

Page 80

APPENDIX 1 
Transformational Review – Terms of Reference 
1 Review Title Bringing Contacts In – House
2 Identified Issues The Council currently has external contractors operating within each
Resource in order to assist with a range of services and works.   
These include areas such as Home Care, road works, construction
works, early years and counselling services. 
The Council is facing unprecedented financial pressures and it is
now more vital than ever that the Council utilises all resources at its
disposal to ensure best – value is being delivered when procuring a
service; this may include internalising delivery by bringing contracts
in – house. 
Identified Outcome(s)  With the Council facing unprecedented financial pressures, it is vital
that the Council utilises all resources at its disposal to ensure best
value is being delivered when procuring a service.  This may include
internalising delivery by bringing contracts in-house. 
This will include an understanding of where and why the Council
procures external contractors with regards to cost / capacity /
capability and the development of medium to long term Service
plans to bring identified opportunities in – house. 
3 Scope of Review A review of ledgered and procured spend across all Resources will
be carried out to identify areas of high spend with suppliers   
Alongside input and consideration from Executive Directors, areas
of high spend with suppliers will be reviewed with a view to
identifying which contracts have the potential to be delivered in –
house at a net benefit to the Council. 
4 Resources affected: -
Community
and Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
5 Financial overview (£m) to be completed by finance where appropriate – will be
confirmed when the scope of the review is determined. 
CER EDR FCR HTR SWR 
Employee costs     
Property costs     
Supplies and services     
Transport charges     
Admin costs     
Payments to other Bodies     
Payments to Contractors     
Finance charges     
Total expenditure     
Fees and charges     
80

Page 81

Other income     
Total income     
Net expenditure     
6 Key aims of/outcomes from project 
Service/operational • Generate efficiencies by ensuring contracts are delivered at
best value.
• An understanding of where and why the Council uses external
suppliers for Service delivery
o Cost / Capacity / Capability
• Service plans / timelines for contracts to be delivered in house
(where net benefit has been identified)
Employee • Utilise current workforce to deliver services at best value. 
Other n/a
7 Key milestones 
• January 2025 - Terms of Reference presented to CMT Efficiencies
• February 2025 - Review of ledgered and procured spend, with areas of high spend
identified (to be reported on 04 March).
• March 2025 - Executive Directors to review areas of spend and identify potential
opportunities to bring contracts in–house (by end April 2025).
• May to August 2025 - Service Plans created for transition towards bringing contract in–
house. 
8 Monitoring and reporting arrangements 
• CMT Efficiencies – Initial Report and Terms of Reference (21 January 2025)
• CMT Efficiencies – Interim Report (04 March 2025)
• CMT Efficiencies – Final Report (April 2025)
• Updates to PRSF
o 01 April 2025
o 17 June 2025
o 19 August 2025
o 25 November 2025 
9 CMT Sponsor / Lead Officer 
Sponsor – Jackie Taylor
Lead Officer(s) – David Booth, Anne Donaldson, Stephen Gibson, Soumen Sengupta 
10 Project resourcing 
Services / personnel involved in review:
• Finance (Transactions)
• Finance (Strategy)
• PMO 
• Resource representatives as required – depending on agreed scope of review. 
81

Page 82

Appendix 2   
Flow Chart – Decision Making re Delivering Services In–house 
82

Page 83

Report
Agenda Item 
To: Performance and Review Scrutiny Forum
Date: 1 April 2025
Prepared by: Executive Director (Finance and Corporate Resources)  
Subject:  Third Sector Partnership Review
1. Purpose of Report
1.1. The purpose of this report is to:- 
 set out the Terms of Reference for a Third Sector partnership review that will
take forward discussions between South Lanarkshire Council and the local
Third Sector seeking to improve their relationship and how it operates 
2. Recommendation(s):
2.1.  The forum is asked to approve the following recommendation(s):- 
(1) that the content of this report and Terms of Reference, attached at Appendix 1,
be noted.
3. Background
3.1. In a report to Executive Committee on 11 December 2024, South Lanarkshire
Council responded to the Third Sector’s Keep the Beat Alive (KTBA) campaign,
providing an action plan to support improvements on some of our processes around
funding and making a commitment to improve our partnership with the local Third
Sector. 
3.2 The three key ’asks’ of the KTBA campaign are:
1. Recognise the sector’s value.
2. Smarter more sustainable funding practices.
3. Meaningful engagement between the Third Sector and decision makers. 
3.3  Voluntary Action South Lanarkshire (VASLan) is the Third Sector Interface (TSI) for
South Lanarkshire. There is one TSI in each local authority area and they undertake
four key functions: 
 building capacity
 source of knowledge
 connecting partners
 voice of the sector 
3.4. VASLan’s 2024 Impact report, highlights there are more than 1,400 Third Sector
organisations operating across South Lanarkshire, providing support and services in
health and wellbeing, connecting communities, support at home and working in
community education and employability fields, and more.  
7
83

Page 84

3.5. The Council’s Chief Executive met with VASLan’s new leadership team in December
2024 and the Third Sector Chief Officer’s Group in January and February 2025, to
further understand and define the issues to be addressed through a review. 
3.6. The management of services procured from the Third Sector is already covered
under the Standing Orders on Contracts but further discussion on ways and support
to make procurement more accessible to the local sector will be on-going. 
3.7. The Third Sector includes community groups, charitable service providers and not-
for-profit social enterprises operating in South Lanarkshire. 
4 Purpose of the Review
4.1.  The review will improve understanding of the role and the value of the local Third
Sector’s contribution to local strategic outcomes, better demonstrating its role in
expressed strategic aims across a range of policy areas including, but not limited to,
community wealth building, fair work, tackling poverty and inequality, and increasing
community empowerment. 
4.2. The review aims to identify actions which could make South Lanarkshire the best 
environment for the local Third Sector to operate in Scotland, acknowledging the
financial environment in which the Council and the Third Sector operate. 
4.3.  The review will build on the Keep the Beat Alive action plan, approved by Executive
Committee in December 2024, and will produce a collaborative Third Sector
agreement that will define and outline the guiding principles, standards and courses
of action for engaging Third Sector stakeholders in both strategic and operational
planning and ensuring the visibility of their contributions to outcomes for South
Lanarkshire’s residents. 
4.4.  The Review will define the responsibilities of all stakeholders in this relationship and
differentiate between the Third Sector’s ‘professional strategic partner’ relationship
and it’s ‘delivery partner’ relationship and pertinent conduct in both relationships for
all contributors and how these different roles should impact on our financial
relationships. 
4.5. In particular, the Keep the Beat Alive campaign dialogue picked up several actions in
the Fair Funding Charter relating to grant provision, decision-making and their
management that requires further investigation and collaboration with stakeholders
before this can be clarified in procedural guidance. 
4.6. This Third Sector Review will therefore also seek to establish a fair, open and
transparent policy for the provision and monitoring of grants, and a small number of
Third Sector payments made through other mechanisms other than grants or
procurement, from South Lanarkshire Council. It will consider the need to define any
high-level strategic priorities specifically for the Third Sector in a grant policy. 
4.7. As one specific aspect, the review will investigate if South Lanarkshire Council
should mandate the payment of the Living Wage with the provision of grants and
other payments to the Third Sector. It will also consider if greater use could be made
of the procurement route for some services. 
84

Page 85

4.8. Other stakeholders would have an interest in participating in developing any of the
provisions of the Fair Funding Charter as it relates to grants and other payments to
the Third Sector not directed through formal procurement. These include elected
members and the local Third Sector, and therefore a co-design approach will be
undertaken. 
4.9. The terms of reference in Appendix 1 outline the scope and topics for discussion
through a Third Sector Review and its intended outputs and outcomes. 
5 Review Process
5.1. An initial presentation and discussion was held with the Third Sector Chief Officers
Group to agree a process of workshops and Fair Funding Topics for engagement in
January and February 2025. 
5.2. Deliberative workshops and events will take place between April and May 2025.
Engagement reports will be produced and shared. 
5.3. Drafts of a Third Sector agreement and a draft grant policy and initial impact
assessment will be prepared throughout June and July 2025, with a final report to be
provided to Executive Committee on 24 September 2025.
6 Employee Implications
6.1. There are no direct employee implications.
7 Financial Implications
7.1. There are no financial implications at this stage. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
9.  Other Implications
9.1. Recommendations include improvement work across a range of services that
provide grants and other payments to the Third Sector not directed through formal
procurement. 
10. Integrated Impact Assessment and Consultation Requirements
10.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, and therefore no impact assessment
is required at this time. 
10.2. As indicated in this report and the terms of reference, the Third Sector will be involved
in co-designing the new approach. There is no requirement to undertake any other
formal consultation in terms of the information contained in this report at this time. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
12 March 2025  
85

Page 86

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable Priorities 
 Inspiring learners, transforming learning, strengthening partnerships 
 Thriving business, fair jobs and vibrant town centres 
Previous References
None 
List of Background Papers 
None 
Contact for Further Information
If you would like further information, please contact: 
Jen Kerr, Community Engagement Manager
E-mail:  jennifer.kerr1@southlanarkshire.gov.uk
86

Page 87

Appendix 1 
Transformational Review – Terms of Reference 
1 Review Title South Lanarkshire Council (SLC)/Third Sector Partnership
Review
The Third Sector encompasses a diverse range of
organisations, including voluntary and community groups,
charities, social enterprises, co-operatives, and other not-for-
profit entities operating in South Lanarkshire. These
organisations play a vital role in supporting communities,
delivering essential services, and driving social change
through collaborative partnerships with SLC and other
stakeholders.
2 Identified Issues VASLan launched the Keep the Beat Alive (KTBA) campaign
in Spring 2024 and a Council motion requested officers
consider the degree to which SLC could meet the Fair
Funding Charter featured in the campaign. 
A report to Executive Committee on 11 December 2024
provided an action plan to support improvements on some of
our processes around funding and made a commitment to
work in partnership with the local South Lanarkshire Third
Sector through a Third Sector Partnership Review to further
define the nature and terms of our strategic and financial
relationship around the three key “asks” of the KTBA
campaign: 
1- Recognise the sector’s value.
2- Smarter more sustainable funding practices.
3- Meaningful engagement between the third sector and
decision makers. 
Recognising that we build on many local positive examples
and foundations across these three key asks, the review will
focus on clearly co-defining a set of values and principles
against which Third Sector and SLC partners consistently
adhere to in our relationship.
The review will acknowledge the Third Sector’s role as a key
pillar in South Lanarkshire’s public service ecosystem,
alongside statutory bodies, and seek ways to maximise
opportunities to work together to best meet shared outcomes
for our communities.
We share a need to define the meaning of “equal partners”
and to develop a relationship characterised by honesty, trust
and integrity for, and from, all parties.
Subsequent meetings between the Council and both
VASLan and the Third Sector Chief Officers Group in
December 2024, January 2025 and February 2025 helped
inform the issues and the scope of this review.  
This terms of reference outlines the range of actions to
consider taking forward in discussions between South
Lanarkshire Council and the local Third Sector, and seeks to
improve this relationship and how it operates. 
87

Page 88

Issues identified through Keep the Beat Alive dialogue and
ongoing engagement with third sector, include:
• A challenging financial situation for both Third Sector
and SLC and the risks this brings to our organisations
and the communities we jointly serve.
• Instability and a high risk of closures in local Third
Sector expected in the coming years.
• Recognition of the need to improve SLC’s strategic
and financial relationship with the sector.
• The need for a clear corporate approach to increase
stakeholder engagement in service and strategic
planning. 
• A desire for improved notice and timescales in our
financial relationship to assist with planning and
management in the Third Sector. 
• Explore other ways to enhance the sustainability of
third sector organisations, including workforce
development, capacity building, and long-term
strategic partnerships with the Council.
• Requirement for clear, open and transparent grant
processes, procedures and policy.
• Further need to make procurement more accessible
to the local Third Sector.
• A need to improve the understanding of the sector’s
work, its value and to attribute its outcomes to a
whole system approach to public service through
shared outcome frameworks. 
• Explore how to create sustainable conditions within
all partners’ financial constraints to be able to
implement fair work principles, ensuring that
commitments to the Real Living Wage and
employment standards are achievable, affordable and
planned for, so as to be sustainable for organisations
operating within financial constraints. 
• A need to explore, agree and recognise a Third
Sector mechanism for representative engagement.
Fair, open and transparent mechanisms for including
third sector professional perspectives should be
embedded as early as possible in the design of policy
and decisions made against it. 
This review will produce a co-designed South Lanarkshire
approach that will outline how we will reset the relationship
between SLC and the local Third Sector and what the new
relationship will look like. Options including the development
of a Third Sector Agreement to make clear the commitments
of all parties.
This review will consider the impact of short-term funding
agreements on financial stability and long-term service
planning for Third Sector organisations.
The review will also co-design a grant policy and supporting
guidance, for fair, open and transparent grant processes
across all of SLC funded programmes which allocate the
Council’s own funds, and in some cases where we are
distributing funding from other sources using our own
processes. 
88

Page 89

VASLAN will provide support to ensure that the Third Sector
across South Lanarkshire is informed, included and enabled
to contribute.
The review will address the relevant points of a Fair Funding
Charter Topics outlined in the action plan.
Identified Outcome(s)  Aim: To identify actions which could make South
Lanarkshire the best environment for the local Third
Sector to operate in Scotland, acknowledging the
financial environment the council and the Third Sector
operate in.
This review will produce:
1- A South Lanarkshire Third Sector Agreement outlining
the guiding principles, standards and courses of action
for engaging local third sector stakeholders in both
strategic and operational planning and ensuring the
visibility of their value and contributions to outcomes for
South Lanarkshire’s residents. 
a. This document will outline the responsibilities of
all stakeholders in this relationship and
differentiate between the third sector’s
“professional strategic partner” relationship and its
“delivery partner” relationship and pertinent
conduct in both relationships for all contributors.
b. It will develop procurement skills and practice to
increase local third sector ability to bid for local
contracts.
c. And it will develop corresponding practice
guidance and training for council officers to
implement the resulting policies and agreements. 
2- A fair, open and transparent policy and process for the
provision and monitoring of grants from South
Lanarkshire Council based on the Fair Funding Charter
and Keep the Beat Alive Action Plan.
3 Scope of Review and
Outputs to Report
The scope of the Third Sector review will include our
relationship throughout all services of South Lanarkshire
Council, including those delivered through the Health and
Social Care Partnership.
The grant review element will include all of SLC grant
programmes which allocate the council’s own funds, and in
some cases where we are distributing funding from other
sources using our own processes.  
Outputs will include- 
• Stakeholder engagement workshops and reports.
• Update reports for Corporate Management Team (CMT).
• A draft local Third Sector Agreement.
• A draft Grant Policy 
• Guidance and ongoing support for officers to implement.
• Fair, open, transparent, third sector engagement
mechanisms. 
89

Page 90

4 Resources affected: - All Resources
Community
and
Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
5 Financial overview (£m) to be completed by finance where appropriate 
The data below includes the 2023/24 grants and non-procured payments to 3rd sector
organisations paid through Payments to Other Bodies.  Any other payments to 3rd sector
organisations through other budget lines will be identified as part of the review work. 
CER EDR FCR HTR SWR 
Employee costs     
Property costs     
Supplies and services     
Transport charges     
Admin costs     
Payments to other Bodies 0.038 0.004 1.059 - 4.318
Payments to Contractors     
Finance charges     
Total expenditure 0.038 0.004 1.059 - 4.318
Fees and charges     
Other income     
Total income - - - - -      
Net expenditure 0.038 0.004 1.059 - 4.318
6 Key aims of/outcomes from project 
Service/operational Clear corporate vision and guidance for an improved and
sustainability-focused Third Sector relationship that creates
the best environment for the local third sector to operate in. 
This vision will value and leverage the local third sector’s
professional expertise, local relationships and third sector
sources of funds to contribute to agreed, shared local
strategic outcomes.
A fair, open transparent policy and corresponding guidance
on grant funding and how it operates throughout South
Lanarkshire Council. 
Employee Increased support for officers involved in decision-making on
strategic and operational planning and the delivery and
monitoring of Council grants. 
Other Provide fair, open and transparent guidance for local Third
Sector partners when applying for SLC funding.
Further development of SLC’s approaches to stakeholder
engagement and collaborative relationships with the local
Third Sector. 
90

Page 91

7 Key milestones 
1. Performance and Review Scrutiny Forum 1 April 2025
2. Deliberative Workshops & Reports: Elected Members and Third Sector: April-
May 2025.
3. Policy drafting and initial impact assessments: June 2025
4. Report to Executive Committee 24 September 2025. 
8 Monitoring and reporting arrangements 
• Interim updates to CMT at key milestones
• First drafts of Third Sector Charter/ commitment and policy draft report in July
2025.
• Informal engagement event reports. Audiences: CMT, third sector and
members in May 2025.
• Executive Report 24 September 2025 
9 CMT Sponsor / Lead Officer 
Jackie Taylor- CMT Sponsor 
Tom Little – Lead Officer
10 Project resourcing 
▪ Community Engagement Team Manager and Community Project Development
Officer will undertake the coordination of the project.
▪ An internal steering group will be established to support the development of both
policies. Membership to be agreed.
▪ Further input and oversight at all stages from CMT, Finance and Legal will be
required for the development of recommendations. 
▪ VASLan will support the hosting of third sector workshops and facilitate the input
and oversight of the third sector’s collaborations and contributions. 
91

Page 92

92