Democracy Spraffa

Agenda Document Pack - Performance and Review Scrutiny Forum - 04/02/2025

South Lanarkshire Council · 4 February 2025
Back to Performance and Review Scrutiny Forum — 4 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 27 January 2025 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 04 February 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers, Maureen
Devlin, Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
19 November 2024 submitted for approval as a correct record.  (Copy attached) 
3 - 8 
Item(s) for Consideration 
3 Audit Scotland Report Delivering for the future – why leadership matters
Report dated 5 December 2024 by the Chief Executive.  (Copy attached) 
9 - 14 
4 Accounts Commission New Approach to the Audit of Best Value – City of
Edinburgh, Clackmannanshire and Scottish Borders
Report dated 7 January 2025 by the Chief Executive.  (Copy attached) 
15 - 20 
5 Transformational Reviews - Update
Report dated 7 January 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
21 - 30 
6 Transformational Reviews – Forward Reporting Programme
Report dated 10 January 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
31 - 34 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370 089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 19 November 2024 
Chair:
Councillor Joe Fagan 
Councillors Present:
Councillor John Anderson, Councillor Gerry Convery (Depute), Councillor Andrea Cowan (substitute
for Councillor Maureen Chalmers), Councillor Maureen Devlin, Councillor Richard Lockhart,
Councillor Katy Loudon, Councillor Davie McLachlan, Councillor Kirsten Robb, Councillor John
Ross 
Councillor’s Apology:
Councillor Maureen Chalmers 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy; L Marshall, Finance
Adviser; N Reid, Improvement and Community Planning Manager
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development; C Park, Head of Roads, Transportation
and Fleet Services
Finance and Corporate Resources
J Taylor, Executive Director; C Fergusson, Head of Finance (Transactions); M Milne, Head of
Personnel Services; A Norris, Administration Assistant; L O’Hagan, Head of Finance (Strategy); T
Slater, Administration Adviser
Housing and Technical Resources
H Philips, Performance Co-ordinator
Social Work Resources
L Purdie, Head of Children and Justice Services 
1 Declaration of Interests 
No interests were declared. 
Councillor Anderson made a transparency statement in relation to item 7 of the agenda –
Review of Routes to Work South, as he was a member of the Routes to Work South Board. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Performance and Review Scrutiny Forum held on 27 August
2024 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Council Plan Connect 2022 to 2027: Quarter 2 Progress Report 2024/2025 
A report dated 31 October 2024 by the Chief Executive was submitted on the progress of
‘Connect’, the Council Plan 2022 to 2027, at the Quarter 2 Stage of 2024/2025.
2
3

Page 4

‘Connect’ detailed the Council’s vision, values, priorities and outcomes to be delivered in the 5-
year period of the Plan.  Of the 61 key strategic measures nominated for reporting against the
Plan:- 
 1 project has been completed
 43 had met their timescale or target as per expectations
 8 had minor slippage against timescale or minor shortfall against target
 3 had major slippage against timescale or major shortfall against target
 6 had information which was not available or included for ‘information only’, to set
performance information in context 
A summary of the key achievements against each of the 6 ‘Connect’ Outcomes was contained
in the report and the ‘Connect’ Performance Report for Quarter 2, 2024/2025, covering the
period to the end of September 2024, was attached as Appendix 1 to the report. 
To aid scrutiny, a further analysis had been introduced, to follow-up the measures from the
previous year’s Quarter 4 report that had been assigned as ‘report later’.  There were no report
later measures in the Quarter 4 2023/2024 report, therefore, no further action was required. 
The Forum decided: 
(1) that the Connect Quarter 2 Progress Report 2024/2025, summarised in the report and
detailed in Appendix 1 to the report, be noted; and 
(2) that the summary of the Council’s key achievements against the 6 ‘Connect’ Outcomes be
noted. 
[Reference: Minutes of 27 August 2024 (Paragraph 3)] 
4 Resource Plans - Red and Amber Results at Quarter 2, 2024/2025 
A report dated 31 October 2024 by the Chief Executive was submitted on performance
measures where results at Quarter 2, 2024/2025 had been recorded as either ‘red’ (there had
been major slippage against timescale or major shortfall against target) or ‘amber’ (there had
been minor slippage against timescale or minor shortfall against target). 
Across all Resources, 15 out of 256 measures relating to Council priorities had a status of
‘amber’ and 8 had a status of ‘red’.  The remaining 233 measures (91%) had a status of ‘blue’
(project completed), ‘green’ (the timescale or target had been met in line with expectations) or
‘report later’ (the information was not yet available to allow officers to say whether the target had
been reached or not but would be reported when available). 
For 2024/2025, there had been a slight decrease in the number of ‘red’ and ‘amber’ measures
reported in comparison to the previous year.  This was due, in part, to a continuing and
comprehensive review of measures and targets which had resulted in greater clarity when
assigning measures with the appropriate status. 
An explanation on progress to date, the circumstances which had determined the ‘red’ or
‘amber’ status, including unforeseen changes in timescales, circumstances, or work being
underway but not yet complete, and progress updates providing revised timescales for
completion, where relevant, as well as management actions, were provided in Appendix 1 to the
report.   
The Forum decided: that the report be noted. 
4

Page 5

5 Local Government Benchmarking Framework (LGBF) 2022/2023 Results and
Action Plan - Update 
A report dated 24 October 2024 by the Chief Executive was submitted on the updated Local
Government Benchmarking Framework (LGBF) results for 2022/2023. 
The LGBF compared spend/cost, performance and customer satisfaction results over several
years and between similar councils.  It comprised a number of performance indicators across a
range of services. 
An initial report on the 2022/2023 LGBF results was submitted to the Forum on 19 March 2024. 
Updated information was provided on the 2022/2023 LGBF results in Appendix 1 to the report. 
Across the 102 indicators in the 2022/2023 suite, the Council’s performance improved against
53 (52%) indicators, remained the same against 4 (4%) indicators, and declined for 36 (35%)
indicators.  There were 9 (9%) indicators for which the results or trend information was not yet
available for 2022/2023, including the Scottish Household Survey (SHS) satisfaction data and
educational attendance/exclusions. 
In terms of South Lanarkshire’s figures relative to national results, performance was better than
the Scottish average for 51 (50%) indicators and was worse than the average for 40 (39%)
indicators.  2 (2%) indicators were in line with national results and there were 9 (9%) indicators
for which the 2022/2023 results were not yet available. 
The updated 2022/2023 LGBF results for the Council would be uploaded onto the performance
pages on the Council’s website.  In addition, South Lanarkshire’s LGBF Dashboard would be
updated for the results released since March 2024 as well as the explanatory narratives
provided by Resources.   
The Forum decided: 
(1) that the updated LGBF results, narrative and actions for 2022/2023 be noted; 
(2) that it be noted that the updated LGBF results and explanatory narratives would be
published on the performance pages of the Council’s website; and 
(3) that it be noted that South Lanarkshire’s LGBF Dashboard would be updated. 
[Reference: Minutes of 19 March 2024 (Paragraph 4)] 
6 Transformational Reviews – Cross-Cutting – Update 
A report dated 16 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the cross-cutting reviews that were part of the
Transformational Change Programme for 2025/2026. 
At its meeting on 26 June 2024, the Council’s Executive Committee noted the Transformational
Change Programme that was required to drive continuous improvement and efficiencies, and
link into the Budget Strategy over the next 3 years. 
A report was submitted to the Forum on 27 August 2024, providing information on the first
tranche of reviews.  This report provided an update on those reviews and included information
on proposed savings for the 2025/2025 Budget Strategy, as detailed in Appendix 1 to the report,
which had been presented to members for consideration as part of the budget setting process. 
Terms of Reference had been prepared for the Digital Transformation review and Customer
Engagement review, which were closely aligned, and attached as appendices 2 and 3 to the
report respectively.
5

Page 6

There were 2 final cross-cutting reviews yet to commence on In-house and Procured Services,
and Depot Rationalisation. 
The Executive Director (Finance and Corporate Resources) responded to members’ questions
in relation to:- 
 overtime savings, advising that those were expected to be permanent
 the current use of Artificial Intelligence by the Council and the considerations that would be
required for any future use, which would be part of the Digital Transformation review
 the proposed change to the provision of insurance for parent councils and support that
would be provided by the Council.  This would be treated as a question relating to the
budget process and, thereafter, circulated to all members 
The Forum decided: that the report be noted. 
[Reference: Minutes of the Executive Committee of 26 June 2024 (Paragraph 9) and Minutes of
27 August 2024 (Paragraph 6)] 
7 Review of Routes to Work South 
A report dated 23 October 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on the review of Routes to Work South (RTWS). 
RTWS was a South Lanarkshire based company limited by guarantee and a registered charity
that delivered a range of employability programmes on behalf of South Lanarkshire Council. 
RTWS was established in 2001 and operated as an Arms-Length External Organisation (ALEO)
of the Council, delivering services through Teckal arrangements which were negotiated on an
annual basis. 
A review of employability services took place in 2022/2023 and resulted in the transfer of the
Employability Service to Community and Enterprise Resources.  This had reduced duplication,
achieved savings and ensured the Service was flexible and responsive to a changing funding
climate.  However, elements of duplication remained between the Council and RTWS and it was
considered that a wider review would provide opportunities to further reduce duplication and
achieve best value. 
The Terms of Reference for the review of RTWS were attached as Appendix 1 to the report. 
The Head of Enterprise and Sustainable Development responded to a member’s questions in
relation to the purpose and potential outcome of the review. 
The Forum decided: that the report and Terms of Reference of the review of
Routes to Work South, attached as Appendix 1, be noted. 
8 Agile Working Guidance 
A report dated 15 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the proposal to review agile working arrangements across the Council. 
The Covid-19 pandemic was instrumental in changing how the Council delivered its services
and, since 2020, there had been a significant shift to digital and a gradual and planned
reintroduction of service delivery which, over the last 4 years, had resulted in a range of flexible
and agile working arrangements in place across the Council. 
The move to more flexible working arrangements had also resulted in a change in employee
working patterns.  Therefore, as the current arrangements had been in place for 3 years, it was
considered appropriate to review the agile working arrangements in place across the Council.
6

Page 7

A Terms of Reference for the work to develop guidance for agile working was attached at
Appendix 1 to the report.  To support the review, benchmarking would take place to gather
information on the arrangements in place in other local authorities and a survey undertaken to
ascertain an accurate position on current arrangements in place across the Council. 
The Executive Director (Finance and Corporate Resources) responded to a member’s question
in relation to the review taking into consideration potential impacts on employees. 
The Forum decided: that the report and Terms of Reference in relation to the
review of agile working arrangements, attached at
Appendix 1, be noted. 
9 Corporate Standards 
A report dated 15 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the Council’s Corporate Standards and proposals to review and update the
Standards and supporting documentation. 
The current Corporate Standards were published in 2012 and were designed to be the minimum
standards expected to ensure a base level of consistency across the Council.  Since 2012, there
had been changes in how the Council operated and delivered its services.  In addition, there had
been the normal turnover of employees since the pandemic in 2020, where employees had
commenced employment during a time of change.  This had led to some inconsistencies in
practice. 
A Terms of Reference for the review of Corporate Standards, which would be undertaken in 2
stages, was attached at Appendix 1 to the report. 
The Forum decided: that the review process and Terms of Reference in relation
to corporate standards, attached at Appendix 1, be noted. 
10 Urgent Business 
There were no items of urgent business. 
7

Page 8

8

Page 9

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 4 February 2025
Report by: Chief Executive  
Subject: Audit Scotland Report: Delivering for the future – why
leadership matters 
1. Purpose of Report
1.1. The purpose of the report is to:- 
• provide the Forum with a summary of the Audit Scotland report ‘Delivering for the
future – why leadership matters’ published in July 2024 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the key findings within the report be noted. 
3. Background
3.1. In July 2024, Audit Scotland published the above report on behalf of the Accounts
Commission.  The audit of Best Value is now integrated into the annual financial
audit. As part of this, auditors are asked to report on a specific thematic issue
chosen each year by the Accounts Commission, recognising the risks and
challenges councils face. The theme was ‘Leadership of the development of new
strategic priorities’. 
3.2. This report highlights some of the common points identified by auditors in their
management letters, with the aim of assisting councils as they review and develop
their priorities further. It also sets out a summary of the Commission’s expectations
for Best Value in this area, along with improvement areas frequently identified by
auditors. 
4. Findings
4.1. The Accounts Commission identified the following findings from their analysis: 
• The leadership in all councils have established a clear vision supported by
revised priorities informed by the views of citizens and communities. All
councils have an agreed plan aimed at tackling poverty and inequalities, and all
councils reflect sustainability of the environment in their strategic priorities. All
councils have shown that the views of citizens and communities have been
reflected in setting the priorities in some form, and most chose to communicate
the updated vision through their website.  
3
9

Page 10

• Most councils have set out what they want to achieve in their priority areas, but
improvements are needed in performance monitoring and reporting.
Auditors highlighted a number of areas for improvement, including the clarity of
outcome measures and targets, arrangements for monitoring and scrutinising
progress, and the accessibility and timeliness of performance reporting on council
websites.
• Councils need to do more to ensure budget decisions and financial strategies
are aligned to priorities.  Making the best use of public resources is at the heart
of delivering Best Value and a key leadership responsibility. This means that
councils need a clear plan of how they will use their resources and assets to
support the delivery of their local priorities. As financial pressures continue this is
going to become even more important. Some auditors highlighted that councils
have plans in place to drive transformation and change: this is an area auditors
will look more closely at in 2025.
• Members and officers are working collaboratively, but maintaining and
strengthening these relationships, and ensuring strong governance and
scrutiny is key to ensuring tough decisions are made effectively. Auditors
recognised the steps many councils took to support newly elected members and
to provide ongoing training and development. But they also highlighted the need
for members to take personal responsibility for their development, making use of
the opportunities provided by councils for training so that they have the skills
required for effective scrutiny, decision-making and collaboration. Auditors
highlighted concerns with recruitment and turnover challenges in key leadership
and financial posts, encouraging councils to ensure capacity risks are managed
after leadership restructures.
• Community empowerment is a local priority for most councils. Auditors noted
examples of communities designing and co-producing services, including
examples of participatory budgeting to involve communities in local spending
decisions. While achieving the target of subjecting one per cent of net revenue
budgets to participatory budgeting remains aspirational for many, councils have
demonstrated engagement with citizens and communities in the budget setting
process but there is scope to strengthen this engagement.   
4.2. In conclusion, the report states: “Overall, auditors have concluded that councils have
set a clear vision and priorities following the local government elections but ensuring
they have the detailed plans to support delivery, effective collaborative working
relationships to enable tough decisions and clear performance reporting to support
effective scrutiny is key to ensuring the sector can respond to the challenges ahead” 
5. Common Improvement Actions Identified by Auditors
5.1. The report identified the following actions:- 
Improvement Action South Lanarkshire Council (SLC) Position
Clarifying the outcome
measures and targets for
council priorities.
The Council Plan Connect and the annual Resource
Plans set out the measures and targets for the
Council priorities
Improving arrangements for
monitoring and reporting on
progress against corporate
priorities to elected members to
support effective scrutiny.  
Progress against priorities and outcomes in Connect
/Resource Plans are monitored quarterly and reported
to elected members every 6 months: at Quarters 2
and 4. These reports are also available to the public
on the Council’s website.
10

Page 11

Making performance reporting
on council priorities on the
website more accessible to the
public and ensuring it is updated
regularly.
Information is easily and readily accessible to the
public on the performance pages on the Council’s
website and is updated annually at the very least.
These pages are signposted to the public through
social media posts. 
Ensuring that workforce, assets,
digital, capital and service plans
are aligned to corporate
priorities.
The revised Workforce Strategy is aligned to the
Council Plan and links to key strategies, specifically
Digital. 
The IT Service Plan is aligned with Resource
demands for digital and technology which underpin
corporate priorities. The IT Asset Management Plan is
aligned to Connect and is updated annually. 
The proposed Estates Strategy which will inform and
guide future decisions on assets will be aligned to the
Council Plan Connect. 
The Capital Programme is aligned to the Council Plan
Connect and Equality Impact Assessments (EQIAs) /
Sustainability Impact Assessments were used for the
most recent capital proposals.  Integrated Impact
Assessments (IIAs) will be used moving forward.
Encouraging and supporting
communities to engage
including exploring reasons for
low levels of engagement with
opportunities offered and
ensuring engagement is
meaningful.
The Council and Community Planning Partnership
(CPP) have developed 9 Neighbourhood Plans in our
areas that feature highly on the Scottish Index of
Multiple Deprivation (SIMD). We continue to deliver
on these plans by working with residents in
Stakeholder Groups and by investing in place based
participatory budgeting (PB) to support community
participation and activism around plan priorities. 
PB applications and voter numbers are increasing
year on year. 
The difference this is making is highlighted in
individual area annual reports against the plans. 
We are also developing a locality level of
representation via  Community Partnerships. These
partnerships are community-led and their chairs have
a place on the CPP Board, providing quarterly reports
to each Board meeting for discussion of their priorities
and local issues with other Board members. 
In Autumn 2023, SLC undertook an engagement
exercise on local democracy and participation. Our
engagement targeted residents who tend not to
participate and they made up 56% of respondents.
The results were submitted to the Scottish
Government as our response to its Local Democracy
Review.  The findings of this consultation were also
shared with the CPP Board and highlighted a lack of
understanding of how local government works, how it
11

Page 12

is accountable to the public, a lack of time to
participate, a need for us to improve the information
we provide to inform local participation, as well as a
desire to participate digitally and through voting
exercises such as PB.   
We will work through the CPP to conclude and
evaluate our current Participation and Engagement
Strategy that built neighbourhood planning,
Community Partnerships and PB.  This strategy
comes to an end in 2025 and had delivered its
planned activities. 
We will thereafter co-create a new strategy with our
local engagement structures from the previous
strategy that seeks to develop and strengthen their
skills and capacity to lead local democratic
participation. This new strategy will implement the
findings of our ‘Let’s talk Local Democracy’
consultation to bring in wider forms or deliberation
and participation for those who do not wish to or are
unable to participate in local participation structures. 
Ensuring equality impact
assessments are completed at
an early stage to inform policy
and strategy development and
that equality impact assessment
are published
The Executive Committee agreed on 7 August to
move to an Integrated Impact Assessment (IIA)
process, something the IJB has also now agreed, on
24 September. An update on this went to Executive
Committee (agenda item 10) on  2 October with the
proposed form of IIA. 
The roll out of the IIA process has already begun, with
training having been arranged for staff and a briefing
note issued to the Extended Management Team for
cascading. The training will be clear that IIAs need
completed at an early stage and they will be
published going forward. There will also be Lead IIA
Officers for Resources and a Peer Review Panel for
more notable IIAs, to help support the completion of
IIAs in a consistent manner with suitable quality.
Building on existing net zero
plans to include further detail on
specific project costs and
budgets ensuring they are
sustainable, and including more
information on council’s
websites about what they are
doing to address climate
change and the progress made
The Council acknowledges the serious and
immediate threat of climate change and is committed
to accelerating the pace of action in response to the
climate emergency and in Scotland’s transition to a
net-zero and climate resilient society and economy.
The Climate Change and Sustainability Committee
meets regularly (five times per year) to ensure
progress is made and reported. 
The Council is developing proposals for a 10-year
Estate Strategy to inform and guide future
land/property decisions on the investment,
rationalisation, co-location, and disposal of assets.
The aim is to direct investment into a reduced, higher
quality and energy efficient core estate, which will
12

Page 13

facilitate the transition to net zero. The cost of
achieving the Net Zero targets is significant and there
is no additional funding being made available for this
at this point in time.
Showing how budget decisions
are aligned to priorities and
setting out long term financial
plans, again, aligned with
priorities
The Council’s medium term revenue budget plan is
presented to elected members for approval and is
aligned to the councils priority spend areas and
council priorities including schools, roads and social
care.
The Integrated Impact Assessment (IIA) approach
recently adopted by the council ensures all relevant
legal duties are considered when the Council is taking
major policy or strategic decisions. IIA has been used
for the most recent budgets proposals.
Reviewing the affordability of
proposed capital plans and their
revenue implications
The affordability of capital projects is considered as
part of the capital programme in any given year.  The
revenue consequences of capital projects are
included within the revenue budget strategy. 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Integrated Impact Assessment and Consultation Requirements
10.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy at this time, and therefore no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Chief Executive 
5 December 2024 
Link(s) to Council Values/Priorities/Outcomes
• Ambitious, self-aware and improving  
13

Page 14

Previous References
• None 
List of Background Papers
• Audit Scotland Report ‘Delivering for the future – why leadership matters’ 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
14

Page 15

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 4 February 2025
Report by: Chief Executive  
Subject: Accounts Commission New Approach to the Audit of Best
Value – City of Edinburgh, Clackmannanshire and Scottish
Borders 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the forum of key messages and recommendations from recent reports
published under the Accounts Commission’s new approach to auditing Best
Value
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the key messages and recommendations within the report be noted.
[1recs]
3. Background
3.1. Towards the end of 2023, the Accounts Commission introduced a new approach to
the Audit of Best Value to replace the Best Value Assurance Report (BVAR) regime
which had run from 2018 to 2023. 
3.2. The approach consists of brief Controller of Audit (COA) reports accompanied by
and reflecting on published annual audit reports. These Controller of Audit reports
are considered by the Commission in public and reported publicly. 
3.3. The COA reports are intended to offer a BV-focused reflection on the council’s
annual audit report.  In line with the previous practice of bringing BVAR findings to
the forum to highlight good practice and place our own activities in context, the
findings from the recent COA reports are summarised below. 
4. City of Edinburgh Council (published 24 October 2024)
4.1. 
 The Commission is pleased to see the progress made since our Best Value
Assurance Report in 2020, in particular the actions completed on performance
reporting and medium-term financial planning. However, given the council’s
ambitious strategic priorities and financial challenges, work must be
concluded as soon as possible on the actions to embed community
engagement in service improvement and delivery, and to implement the
Edinburgh Partnership’s new governance arrangements and progress
reporting. 
4
15

Page 16

 Given the fine balance of political power, collaborative political leadership will
be essential to take difficult decisions on how to transform services to make
them financially sustainable. The Commission would urge the council not to
lose sight of community priorities and the impacts of savings options on
service delivery as it goes through its political decision-making processes. 
 The Commission acknowledges the ambitious plans in place to end poverty
and become a net zero city by 2030. However, based on progress to date,
there is still much to do in relation to the targets set. Specific project costs
must be established urgently to better inform decision-making about priorities. 
 Given its priorities and the scale of the financial challenge, the council must
accelerate its transformation and change programme. This will require a
review of how services are delivered in the future, the detailed delivery plans
required to achieve the necessary savings, and an understanding of how
these plans will deliver on the council’s priorities and performance outcomes.
The council has a good track record of delivering savings in recent years, but
not all of these have been recurring, and options for further savings of this
nature are now limited. 
 Engaging staff, partners, and communities in shaping transformation and
change will be vital, along with clear and transparent communications about
what is and isn’t possible. The Commission looks forward to seeing how the
council builds on its current budget engagement work and how it embeds
community engagement across service redesign. Going forward, the council
should provide the opportunity for a range of voices to be heard, not just those
who have engaged previously, and the intelligence from communities should
be clearly laid out in the options presented to elected members to inform
decision-making. 
 The Commission notes that the council plans to significantly increase levels of
borrowing to realise its ambitious capital plan. We do not underestimate the
major infrastructure challenges facing Edinburgh, in particular around housing
and the school estate, but such levels of borrowing bring risks that could
impact future financial sustainability. The council will need to manage this
carefully to ensure that its levels of borrowing are affordable and that service
impacts are minimised. 
 Unlike some other councils, Edinburgh has opportunities on the horizon to
raise additional income, for example the introduction of a visitor levy. The
Commission will watch with interest as work to maximise these opportunities
progresses but would warn the council against using the benefits of potential
future income to defer difficult decisions in the short term. 
 The council has an exciting opportunity to use its new people strategy, revised
workforce plan, and new HR/payroll system to ensure that it has the right
people with the right skills (including digital) for future models of service
delivery. This will be especially important in key areas where service
performance has deteriorated, such as housing and waste, and in areas like
health and social care where workforce capacity and demand-led pressures
are negatively impacting service users. The Commission looks forward to
seeing evidence of the impact of these new plans and systems, including
across its Integration Joint Board, and how they are being used to drive
improvements to services and working practices. 
4.2. The Commission puts forward the following action points for City of Edinburgh:- 
 The council should consider improving its budget papers by providing more
specific savings proposals, the impact of budget reductions on services, and
how these are to be achieved. 
16

Page 17

 The fine balance of political power at the council means that members will
need to work constructively together to reach agreement on options for reform.
 The council should ensure it has a robust measurement and reporting
framework to evaluate progress of the new people strategy and workforce
plan. It should report on specific key performance measures and assess the
impact of its actions, including identifying timescales and assigning service
leads.
 The council should undertake a corporate review of digital skills in its
workforce to identify gaps and areas for improvement. This should include
seeking feedback from staff on its digital provision to innovate and improve
service delivery.
 The council should continue to build on its existing net zero plans to include
further detail on specific project costs and budgets. This should include outturn
information, and details of any additional funding required. This would provide
better information for decision-making about prioritising projects which make
the most impact and therefore maximising the contribution to achieving its
2030 Climate Strategy goals. 
5. Clackmannanshire Council (published 27 September 2024)
5.1. 
 The Commission commends the progress made by the council since previous
Best Value reports in 2018 and 2019, in particular in relation to priority setting,
performance management and scrutiny, budget development, community
engagement and empowerment, equalities and climate change. 
 Like many councils, Clackmannanshire Council continues to face significant
financial pressures and while it has delivered previously identified savings,
there has been a reliance on one-off budget flexibilities and reserves to
balance its budget. The council needs to take urgent action to set out how it
intends to achieve financial sustainability. The Commission strongly
encourages the council to develop a robust Medium-Term Financial Strategy
(MTFS) by the end of financial year 2024/25. The MTFS should link clearly to
transformation plans and projects, workforce and digital strategies, the
council’s Capital Investment Programme, and show how current funding
challenges with the Health and Social Care Partnership (HSCP) will be
addressed. 
 The Commission welcomes the steps the council has taken to develop its
transformation programme. Successful delivery of this programme is essential
to achieve both a sustainable financial position and improve outcomes. As well
as being clear on the resources required to be allocated to the transformation
programme, clarity is also needed in relation to the benefits it expects to be
realised, and by when. 
 Given the particular combination of challenges facing the council – including
capacity, recruitment, resilience within teams, leadership development and
sickness absence – the Commission urges the consideration of all options
within transformation plans and projects including partnering arrangements,
digital delivery, collaboration and shared services to ensure the future
sustainability of service delivery. 
 The Commission recognises the ongoing positive working relationships
between elected members and officers and across political parties, but would
emphasise to members that this should not come at the cost of effective
scrutiny and challenge. 
17

Page 18

 The Commission notes that the comparative performance of
Clackmannanshire Council’s services has declined over time, and that
capacity is impacting progress on improvement actions in some service areas.
The council must be clearer on the action it is taking to tackle poor
performance (including in its transformation programme and projects) and the
impact it expects planned actions to have. 
 The Commission welcomes the council’s approach to engaging the local
community and is pleased to see that the council’s annual priorities align to the
Community Planning Partnership’s local outcome improvement plan (LOIP),
underpinned by a performance management framework. With plans, strategies
and scrutiny arrangement now in place, the Commission will expect to see
evidence of how outcomes are improving over the longer term as part of the
council’s public performance reporting. 
5.2. The Commission puts forward the following action points for Clackmannanshire:- 
 The leadership (both political and officer) has been effective in setting clear
priorities; it now needs to ensure it has the capacity and capability to deliver
them.
 The council should urgently develop a medium-term financial strategy to set
out how it intends to achieve financial sustainability.
 It is critical that the council develops detailed plans at pace, with robust
benefits-realisation tools to demonstrate that it is achieving its intended
outcomes.
 The council should review its capital budget setting and monitoring
arrangements to ensure it sets realistic budgets with clear timelines and a
clear linkage to council priorities. 
6. Scottish Borders Council (published 28 November 2024)
6.1. 
 The council’s commitment to continuous improvement is clear. Despite Covid,
work has continued to respond to all recommendations made in previous Best
Value reports. It has consistently laid out a clear vision and strategic priorities
that respond to its geographic and demographic challenges. 
 The Commission is impressed by the council’s strong approach to financial
management and recognises its financial strategy risk register as an area of
good practice that should be shared. There is a strong track record of
delivering planned savings, a significant proportion of which are recurring.
Going forward, recognising the financial challenges faced, the focus should be
on making savings on a recurring basis. 
 Following successful delivery of ‘Fit for 2024’, the council has set out a
refreshed transformation programme, SBC Way, supported by a ‘self-
replenishing’ change fund approach. The Commission will watch with interest
as to whether the change fund approach delivers the required payback and
recurring savings at the pace required. The Commission would urge the
council to strengthen its reporting on its transformation programme milestones
and expected benefits, as well as ensuring the community is engaged with its
transformation agenda. 
 The council demonstrates a willingness to work with other councils and
organisations, both within and out with the Scottish Borders area. The
Commission encourages it to continue with this approach to support not only
the achievement of the outcomes set out in its Council Plan, but the realisation
of the £18.1 million savings required by 2028/29.  
18

Page 19

 In relation to focusing on performance and improvement, the building blocks
are in place, including timely and accessible public reporting. The council
should strengthen the links between improvement activities and performance
evidence, and the links between the Local Government Benchmarking
Framework and its own priorities and performance indicators. 
 Difficulties in relation to community engagement have been recognised. The
Commission will take an interest in how the council is assessing the impact of
its new Community Engagement Strategy, including evidence of effective
leadership and how the strategy’s principles are being embedded across the
organisation. 
 In response to workforce challenges and risks, the council has undertaken a
range of targeted, service-specific initiatives – including the offer of
accommodation for those recruited into adult social care – and is able to now
see positive impacts. Again, the Commission would encourage the council to
share this good practice. It has also focused on assessing the impacts of post-
Covid ‘agile working’ on productivity, which the Commission commends. The
council should now focus on ensuring closer links between its workforce,
financial and council plans, and develop performance metrics to continue to
measure the impact of its actions. 
6.2. The Commission puts forward the following action points for Scottish Borders:- 
 The council should continue to ensure that future savings are made on a
recurring basis to support financial sustainability.
 Reporting of transformation could be enhanced so that progress against
defined measurable milestones and achievements from the SBC Way
workstreams are more clearly reported to the community.
 Performance reporting can be enhanced by giving more detail and clearer
linkages to actions being taken to address areas for improvement identified in
the quarterly and annual performance reports. 
7. Next steps and recommendations
7.1. Officers of the Council will continue to review the Controller of Audit reports as they
are published to learn any lessons for the Council. Reports on any significant
findings and key messages will be brought to the Forum for information. 
8. Employee Implications
8.1. There are no direct employee implications. 
9. Financial Implications
9.1. There are no direct financial implications. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
11. Other Implications
11.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management.  
19

Page 20

12. Integrated Impact Assessment and Consultation Requirements
12.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy at this time, and therefore no impact
assessment is required. 
12.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Chief Executive 
7 January 2025 
Link(s) to Council Values/Priorities/Outcomes
• Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
20

Page 21

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 4 February 2025
Report by: Executive Director (Finance and Corporate
Resources)  
Subject: Transformational Reviews – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Transformational Reviews that are part of the Council’s
Transformational Change Programme for the year 2025/2026 and beyond 
2. Recommendation(s)
2.1. The Performance and Review Scrutiny Forum is asked to approve the following
recommendation(s):- 
(1) that the update on the Transformational Reviews be noted.
[1rec
3. Background
3.1. In June 2024, a report titled 2025/2026 to 2027/2028 Revenue Budget Strategy was
presented to the Executive Committee. This report highlighted the need for
Transformational Change to manage the significant Budget Gaps facing the Council
over the next 3 years.  The Transformational Change Programme drives continuous
improvement as well as efficiencies and feeds into the Budget Strategy to deliver
savings for 2025/2026 to 2027/2028. 
3.2. An initial paper titled, Cross-Cutting Reviews – Update, was presented to the
Performance and Review Scrutiny Forum on 27 August 2024 with an update on a
series of Cross – Cutting reviews which were not focussed on one Resource, but on
Council wide activities. A further update titled, Transformational Reviews – Cross-
Cutting – Update, presented on 19 November 2024.  That report included any savings
proposed for the 2025/2026 Budget Strategy as a result of these Reviews.  These are
summarised in Table 1. 
Table 1: Cross-Cutting Savings 2025/2026
Saving Reference Saving Proposal Saving 2025/26
£m
M&O01 Procurement 0.955
M&O02 Overtime 0.364
M&O03 Management Structures 1.000
COR01 Council Charges 0.375
Total  2.694 
5
21

Page 22

3.3. This report will provide a further update on the Transformational Change Programme
and will include Cross-Cutting Reviews and Resource specific Transformational
Reviews, to identify savings in the year 2026/2027 and beyond (Section 4). 
4. Transformational Change Programme – Transformational Reviews
4.1. Each review is taken in turn with a summary of their current status. 
4.2. Charging: as reported previously, following the saving proposed for 2025/2026 of
£0.375 million, the original Terms of Reference (ToR) objectives for the Charging
Review have been achieved. The review remains ongoing and is now focused on: 
1) Reviewing the outcomes of the budget consultation
2) ‘Normal’ inflationary charges for future year uplifts
3) Service led review of other Council charging policy
4) Accepted payment methods for charges (e.g. the removal of cheques) 
4.3. Further updates will be provided to the Performance and Review Scrutiny Forum as
the review progresses. 
4.4. Procurement: This review focuses on procurement practices across the Council to
ensure the maximum level of efficiencies and identify cashable budget savings.
Following the saving proposed for 2025/2026, the review has identified further areas
where the intention is to realise savings moving forward.  These include: 
• Wallboard
• Nitrile gloves
• Benefits from using purchase cards 
4.5. This review is ongoing, and any updates will be provided to the Performance and
Review Scrutiny Forum as the review progresses. 
4.6. Overtime: This review of overtime practices and spend will look to reduce expenditure
and remove/reduce associated risks to employees. 
4.7. Following the saving proposed for 2025/2026 of £0.364 million, this review is ongoing
and will look to identify further savings opportunities for 2026/2027 and beyond.  This
includes a focus on looking to reduce the need for overtime though recruitment, and
also consideration on out of hours service requirements.  Any updates will be reported
to the Performance and Review Scrutiny Forum as they become available. 
4.8. Organisational and Management Structures: This is a Personnel led review to
ensure correct balance between management and the staff they oversee. This review
refers to the Organisational Structure Models which were agreed and implemented
formally in 2009/2010 and considers how closely aligned the current structures are to
the agreed preferred operating models (POM).  The 2025/2026 savings pack contains
a proposal to increase the spans of control for these services areas and generate
savings totalling £1.000 million. 
22

Page 23

4.9. This review is ongoing in order to identify further savings opportunities for 2026/2027
and beyond. Phase 2 of this exercise will look to identify further savings in both Grade
4 and above posts within structures that do not meet the POM requirements and in
any layers/tiers that can be streamlined as per the POM. Work on Phase 2 has
commenced and outcomes are expected by the summer. Implementation timeframes
will be considered as part of the Review. Any updates will be reported to the
Performance and Review Scrutiny Forum as they become available. 
4.10. Loans Fund: The review considered two areas of Loans Fund Accounting with a view
to realising benefits in relation to the payment of debt. As noted in the previous report,
this review has now concluded and therefore there will be no further updates on this
review.  Decisions on loans fund review will be taken as part of the budget
considerations for 2025/2026.  A proposal to use the £6.600 million reduction in loan
charges in 2025/2026 to reduce the Budget Gap in that year, was included in the
recent paper to the Council’s Executive Committee.  Further annual savings are also
available, and the full details are included in the Executive Committee report (13
November 2024). 
4.11. Fleet: This review sets out the Fleet principles that Services should consider as part
of their ongoing workstreams in order to lower operational expenses and extend the
lifespan of vehicles. A ToR detailing the scope and outcomes of this review was
presented to the Performance and Review Scrutiny Forum on 27 August 2024. Work
remains ongoing to consider the number of vehicles used by Resources and rightsizing
the Council’s fleet. 
4.12. Digital Transformation: A review of the use of technology will impact on all Reviews
and will focus on how the Council and its customers interact. Three key areas are
being considered: 
• Business Systems and Processes: projects and improvements to key corporate
and line of business applications
• Workforce Productivity: focus on enabling and empowering staff to maximise their
effectiveness and digital literacy
• Customer Engagement: clear and consistent Council-wide customer engagement 
4.13. A ToR was presented in a previous report to this Forum and work remains ongoing
meet the timescales for delivery. 
4.14. Customer Engagement: This review is closely aligned with the Digital Transformation
review and will see the development of a Council Customer Engagement Strategy to
improve digital engagement, accessibility and create efficiencies. The review will
identify opportunities for service improvement, cycle time reduction and cost saving
through transformation of customer contact processes in the main customer facing
Resources and will consider the introduction of new technologies and processes to
deliver efficiency-led, customer services and engagement. 
4.15. A ToR was presented in a previous report to this Forum and work remains ongoing
meet the timescales for delivery. 
23

Page 24

4.16. Property: As advised in the previous report, the Review to look at the Council’s use
of property will be far reaching, covering all Resources and South Lanarkshire Leisure
and Culture, and all areas of Service delivery. The condition, running costs, quality,
performance, location, and use of Council assets will all be considered with the
challenge being to consider the right portfolio of buildings, creating an affordable,
efficient, fit-for-purpose and sustainable core estate that supports the move to net zero,
improves service quality, is people centred and is service driven. The cost of achieving
the Net Zero targets is significant and there is no additional funding being made
available for this at this point in time. 
4.17. All buildings will be reviewed for co-location opportunities with a view to being
multifunctional, flexible, and adaptable to meet the combined needs of services and
service users and promote joint working. This is likely to reduce the number of
properties the Council has. Further information on this Review and its criteria is
covered in another paper titled South Lanarkshire Council / South Lanarkshire Leisure
and Culture – Vision for Future Relationship which was presented to the Performance
and Review Scrutiny Forum on 27 August 2024. 
4.18. An update on this review will be presented to the Executive Committee in March 2025. 
4.19. Depot Rationalisation: A review of the use and users of the depots has now
commenced to consider optimal use of depots across Resources/Services. As part of
a wider strategic initiative, the Council aims to rationalise the number of depots to
achieve operational efficiencies, reduce annual revenue expenditure, and future-proof
its operations in line with zero-carbon obligations for both buildings and vehicles. 
4.20. Work will be ongoing throughout Winter 2024 – Spring 2025 and updates will be
presented to the Performance and Review Scrutiny Forum as available. 
4.21. Third Sector Review:  This review will look at the relationship between the Council
and the Third Sector, building on the recent motion to Council on the Keeping the Beat
Alive initiative and the Fair Funding Charter.  This will include consideration of the
collaborative relationship between the Third Sector and the Council, building on
current relationships to ensure a continued strong working partnership between the
two.  As part of this review, we will also look to update the internal processes and
guidance for the provision of grants for the Third sector. 
4.22. A ToR for this review will be presented to the 1 April 2025 meeting of the Performance
and Review Scrutiny Forum. 
4.23. Factoring: This is a full review of the Factoring Service currently provided by Housing
and Technical Resources to owners of former Council Housing Stock.  This service is
currently provided to 8480 owners within Rutherglen and Cambuslang, East Kilbride
and Hamilton localities. 
4.24. The review is in two phases. The first phase is an examination of the strengths and
weaknesses of the current factoring arrangements, and an appraisal of alternative
service models taking into account potential changes in the legislative framework and
considering the risks and benefits of each.  APSE have been appointed as a consultant
to assist with the review.  
24

Page 25

4.25. A draft report including recommendations is expected from the external consultant in
the first quarter of 2025, and the outcome will be presented to the Housing and
Technical Resources Committee thereafter. 
4.26. The second phase will incorporate consultation with stakeholders and service users
on viable and sustainable options. 
4.27. A ToR has been prepared for this review and is attached in Appendix 1 for information.
This details the extent of the review and what it intends to achieve. It also includes
timescales for delivery. 
4.28. In-house and Procured Services: Consideration will be given to the costs of inhouse
service provision compared to the cost of procuring these same services from external
marketplace. This review has still to commence. 
5. Employee Implications
5.1. There are no direct employee implications from this report. 
6. Financial Implications
6.1. The financial implications are summarised within the report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources. The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
7.2. The main risk associated with the Council’s Capital Programme is that there is an
overspend. The risk has been assessed as low given the detailed project management
plans prepared and monitored for each project. The risk of an overspend is managed
through four weekly Investment Management Meetings. 
7.3. There are no implications for sustainability in terms of the information contained in this
report. 
8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 January 2025  
25

Page 26

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 26 June 2024 
List of Background Papers
 2025/2026 to 2027/2028 Revenue Budget Strategy
 Cross-Cutting Reviews – Update (Performance and Review Scrutiny Forum, August
2024) 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601  (Tel: 01698 452601)
lorraine.o'hagan@southlanarkshire.gov.uk 
26

Page 27

APPENDIX 1 
Transformational Review – Terms of Reference 
1 Review Title Factoring Review
2 Identified Issues A full review of the Factoring Service currently provided by
Housing and Technical Resources to owners of former
Council Housing Stock. At present the service is provided to
8480 owners within Rutherglen and Cambuslang, East
Kilbride and Hamilton localities. 
The Council is authorised to act as factor where;
- Title deeds allow the Council to do so as long as it owns
at least one flat within the block, or
- The majority of owners in a block have appointed the
Council to act as factor. 
The cost of the Service is recovered through the Factoring
Charge raised quarterly to owners. 100% of the cost of
administering the service should be recovered via the
Management Fee and the recharge to HRA.  External fee is
charged quarterly in arrears. 
The costs of common repairs and maintenance is recharged
according to the title deeds and HRA pick up the appropriate
share for tenanted properties. 
Internal issues identified : 
- Owners often refuse to give consent for required repairs
and investment, which not only prevents investment in
those properties that remain in council ownership, it also
means that blocks can fall into disrepair, living conditions
and neighbourhoods deteriorate, property values fall and
the eventual costs of repair are more significant.
- Lack of owner consent can increase the risks that the
council cannot meet its obligations in terms housing
standards and net zero for its own stock. 
- When a complaint is received, invoices are put on hold
whilst investigations are undertaken. Owners are
increasingly challenging bills specifically to delay
payment. 
- There has been a substantial increase in the levels of
enquiries over the past 3 years. This is a self-funded
service and there has been no corresponding increase in
the number of staff to deal with enquires. This has
resulted in Service Statement timescales of responses
within 30 days, not being achieved. This in turn also
reduces the resource available to proactively work with
owners to obtain agreement to works. 
- The use of centralised financial and repairs ICT systems
prevents billing on account in the way that private
factoring companies would deliver the service, therefore
the Council pay all invoices up front and then pursues
payment from owners, which can result in bad debt and
ultimately write offs.
27

Page 28

- The use of the in-house repairs service, results in
competing demand for repairs resources and challenging
prioritisation of repairs between tenant and owned
properties. 
These issues are not unique to South Lanarkshire. A Scottish
Parliament Working Group has been established to consider
Tenement Maintenance and the Scottish Law Commission
has recently commenced consultation on provisional
proposals for the introduction of compulsory owner’s
associations, responses to which are due by August,
although legislative change is not anticipated in this
parliamentary cycle. 
Identified Outcome(s)  - Assessment of the current service model and improved
management information.
- Options appraisal in respect of potential future service
delivery models.
- Consultation with stakeholders and users on future
service models.
- Recommendation in terms of potential ICT solutions
which could allow billing on account.
- Recommendation in terms of repairs service provider.
- Recommendation in terms of future Statement of
Services and charges.
- Implementation Plan. 
3 Scope of Review and
Outputs to Report
The first phase of the review will examine the strength and
weaknesses of the current factoring arrangements, appraise
alternative service models, taking into account potential
changes in the legislative framework and consider the risks
and benefits of each. 
This phase will be carried out by an external consultant. 
The second phase will incorporate consultation with
stakeholders and service users on viable and sustainable
options as well as develop an implementation plan. 
Phase 1 
1. Collation of Business Information, including: 
- Financial such as budget, charges and debt
- Analysis of property location and type
- Analysis of tenure 
2. Appointment of external consultant to: 
- Review current service model,
- Review legislation and benchmarking,
- a ‘gap analysis’ to ensure that the council are meeting all
their obligations in terms of the Property Factors
(Scotland) Act 2011, the Code of Conduct for Property
Factors and the standards and outcomes of the Scottish
Social Housing Charter.
- Identify and risk assess alternative service models
28

Page 29

- Identify short term improvements to existing model.
Phase 2
3. Assessment of options 
4. Consultation with stakeholders and Service Users 
As part of this review there will be appropriate consultation
with users of the factoring service, so that their views can be
taken into account. 
This will be a 2 phase approach, initially with follow up
surveys with those owners that previously participated in the
customer survey and expressed an interest in being
involved. The questions will be informed by the external
consultant.
The further phase of consultation will be at the point where
an initial options appraisal has taken place and will be with a
wider pool of consultees including internal departments,
residents (owners and tenants) and elected members. 
An outcomes-based impact assessment will also be
conducted as part of the review, to ensure the Council’s
various legal duties are met, including in terms of equalities,
the Fairer Scotland Duty and the Consumer Duty. 
4 Resources affected: - 
Community
and
Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work  
X X 
5 Financial overview (£m) to be completed by finance where appropriate 
HTR
Budget Category  General Fund HRA Total HTR
Factoring Factoring Factoring
Annual Annual Annual
Budget Budget Budget 
Employee costs 207 0 207 
Property costs 0 0 0 
Supplies and services 0 0 0 
Transport charges 0 0 0 
Admin costs 30 0 30 
Payments to other Bodies 0 1,027 1,027 
Payments to Contractors 0 0 0 
Finance charges 0 0 0 
Total expenditure 237 1,027 1,264 
Fees and charges 0 (1,027) (1,027) 
Other income (237) 0 (237) 
Total income (237) (1,027) (1,264) 
Net expenditure 0 0 0 
29

Page 30

6  Key aims of/outcomes from project 
Service/operational Improved business model for the Factoring Service
Employee Redesigned service model and resources 
Other Increased involvement by Service Users
7 Key milestones 
1. Collation of data on existing arrangements. June-July 2024
2. Appointment of external organisation to undertake phase 1 – September 2024
3. Analysis and assessment of Phase 1 outcomes – into Quarter 1 2025
4. Consultation – into Quarter 1 2025
5. Reporting of outcomes and development of Action Plan for implementation of
changes – March 2025. 
8 Monitoring and reporting arrangements 
- Final Report: March 2025. 
9 CMT Sponsor / Lead Officer 
Sponsor: Executive Director (Housing and Technical Resources) 
Lead Officer: Head of Property Services 
10 Project resourcing 
- Factoring Manager 
- Repairs Manager
- Housing Manager 
- Housing Investment Team
- Finance Team time required both in connection with provision of initial data and
analysis of the implications of potential alternative service models.
- Procurement Support for analysis of the implications of potential alternative
service models.
- Legal support required both in connection with provision of initial data and
analysis of the implications of potential alternative service models.
- ICT support to assess Factoring Software options and costs. 
30

Page 31

Agenda Item 
Report  
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 4 February 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Transformational Reviews – Forward Reporting
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:-
pose] 
 provide a forward reporting programme to the Performance and Review Scrutiny
Forum for the Council’s programme of Transformational Reviews
[1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
recs] 
(1) that the report and the outline forward programme for the meetings of the
Performance and Review Scrutiny Forum to 25 November 2025, attached as
an Appendix to the report, be noted.
[1recs] 
3. Background
3.1. As part of the ongoing Transformational Change Programme for the year 2025/2026,
a standard agenda item has been prepared, detailing a list of items proposed for
consideration at subsequent meetings of this Committee. The outline forward
programme to 25 November 2025 is attached, for members’ information, as an
Appendix to the report. 
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms of
the information contained within this report. 
7. Other Implications
7.1. There are no risk implications in terms of the information contained within this report.  
6
31

Page 32

8. Integrated Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.  
8.2.  There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 January 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Jackie Taylor, Executive Director (Finance and Corporate Resources)
01698 454622
jackie.taylor@southlanarkshire.gov.uk 
32

Page 33

APPENDIX 1
Transformation Review Programme – Forward Reporting Plan 
Meeting Date Item
01 April 2025  • Cross Cutting:
• Charging 
• Procurement 
• Overtime 
• Organisational and Management Structures 
• Fleet 
• Digital Transformation 
• Customer Engagement 
• Property 
• Depot Rationalisation 
• In – house and Procured Services 
• Third Sector 
• Factoring Review
• South Lanarkshire Council / South Lanarkshire Leisure and
Culture – Vision for Future Relationship
17 June 2025  • Cross Cutting
• Charging 
• Procurement 
• Overtime 
• Organisational and Management Structures 
• Fleet 
• Digital Transformation 
• Customer Engagement 
• Property 
• Depot Rationalisation 
• In – house and Procured Services 
• Planning and Regulatory
• Factoring 
• Roads, Transportation and Fleet Services – Roles and
Responsibilities 
33

Page 34

19 August 2025  • Cross Cutting
• Charging 
• Procurement 
• Overtime 
• Organisational and Management Structures 
• Fleet 
• Digital Transformation 
• Customer Engagement 
• Property 
• Depot Rationalisation 
• In – house and Procured Services 
25 November 2025  • Cross Cutting
• Charging 
• Procurement 
• Overtime 
• Organisational and Management Structures 
• Fleet 
• Digital Transformation 
• Customer Engagement 
• Property 
• Depot Rationalisation 
• In – house and Procured Services 
34