Agenda Document Pack - Performance and Review Scrutiny Forum - 19/11/2024

South Lanarkshire Council · 19 November 2024
Back to Performance and Review Scrutiny Forum — 19 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 11 November 2024 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 19 November 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers, Maureen
Devlin, Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
27 August 2024 submitted for approval as a correct record. (Copy attached) 
3 - 6 
Item(s) for Consideration 
3 Council Plan Connect 2022-2027: Quarter 2 Progress Report 2024/2025
Report dated 31 October 2024 by the Chief Executive.  (Copy attached) 
7 - 36 
4 Resource Plans - Red and Amber Results at Quarter 2, 2024/2025
Report dated 31 October 2024 by the Chief Executive.  (Copy attached) 
37 - 56 
5 Local Government Benchmarking Framework (LGBF) 2022/2023 Results
and Action Plan - Update
Report dated 24 October 2024 by the Chief Executive.  (Copy attached) 
57 - 90 
6 Transformational Reviews - Cross-Cutting - Update
Report dated 16 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
91 - 106 
7 Review of Routes to Work South
Report dated 23 October 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
107 - 112 
8 Agile Working Guidance
Report dated 15 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
113 - 118 
9 Corporate Standards
Report dated 15 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
119 - 126 
Urgent Business 
10  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370 089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 27 August 2024 
Chair:
Councillor Joe Fagan 
Councillors Present:
Councillor John Anderson, Councillor Maureen Chalmers, Councillor Gerry Convery (Depute),
Councillor Maureen Devlin, Councillor Richard Lockhart, Councillor Katy Loudon, Councillor Davie
McLachlan, Councillor Kirsten Robb, Councillor John Ross 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy; L Marshall, Finance
Adviser; N Reid, Improvement and Community Planning Manager
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development; K Carr, Head of Facilities, Waste and
Grounds; C Park, Head of Roads, Transportation and Fleet Services
Finance and Corporate Resources
J Taylor, Executive Director; M Milne, Head of Personnel Services; A Norris, Administration
Assistant; L O’Hagan, Head of Finance (Strategy); T Slater, Administration Adviser
Housing and Technical Resources
S Gibson, Executive Director; L Hayes, Performance and Support Adviser
Social Work Resources
L Purdie, Head of Children and Justice Services 
Also Attending:
K Morrison, Chief Executive, South Lanarkshire Leisure and Culture 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Performance and Review Scrutiny Forum held on 28 May
2024 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Council Plan Connect 2022 to 2027: Quarter 4 Progress Report 2023/2024 
A report dated 23 July 2024 by the Chief Executive was submitted on the progress of ‘Connect’,
the Council Plan 2022 to 2027, at the Quarter 4 Stage of 2023/2024. 
‘Connect’ detailed the Council’s vision, values, priorities and outcomes to be delivered in the 5-
year period of the Plan.  Of the 68 key strategic measures nominated for reporting against the
Plan:- 
 10 projects had been completed
 45 had met their timescale or target as per expectations
2
3

Page 4

 6 had minor slippage against timescale or minor shortfall against target
 7 had major slippage against timescale or major shortfall against target 
A summary of the key achievements against each of the 6 ‘Connect’ Outcomes was contained
in the report and the ‘Connect’ Performance Report for Quarter 4, 2023/2024, covering the
period to the end of March 2024, was attached as Appendix 1 to the report. 
To aid scrutiny, a further analysis had been introduced, with any measures that had changed
status between Quarters 2 and 4 being highlighted and an explanation provided for the change
of status.  On analysis of the measures, 9 had shown a decline in performance and a list of
those measures was attached as Appendix 2 to the report.  The remaining measures had shown
an improvement in status between Quarters 2 and 4 and required no further action. 
Information was also provided on Local Government Benchmarking Framework (LGBF) results,
attached at Appendix 3, which focused on a subset of LGBF indicators aligned to the outcomes
in ‘Connect’.  This provided an opportunity to review strategically important benchmarking
indicators and provided insight into the Council’s performance, as well as comparison with the
national average. 
LGBF indicators would continue to be reported annually to the Forum and included in the
Council’s public performance reporting arrangements, as published on the Council’s website. 
Officers responded to members’ questions in relation to various aspects of the report. 
The Forum decided: 
(1) that the Connect Quarter 4 Progress Report 2023/2024, summarised in the report and
detailed in Appendix 1 to the report, be noted; 
(2) that the summary of the Council’s key achievements against the 6 ‘Connect’ Outcomes, for
the period 1 April 2023 to 31 March 2024, be noted; 
(3) that the additional scrutiny of changes in measure status between Quarter 2 and Quarter
4, summarised in the report and detailed in Appendix 2 to the report, be noted; and 
(4) that the strategic subset of Local Government Benchmarking Framework results, attached
as Appendix 3 to the report, be noted. 
[Reference: Minutes of 5 December 2023 (Paragraph 3)] 
4 Annual Performance Spotlights 2023/2024 
A report dated 23 July 2024 by the Chief Executive was submitted on the Annual Performance
Spotlights (APS) infographics for 2023/2024. 
The infographics contained in the 2023/2024 APS were attached as Appendix 1 to the report. 
For each infographic, trend information was included with a clear indication as to whether
performance had improved and if the target had been met.  A link was also provided directly
below the infographic on the website to supporting data, further reports or more detailed
information. 
Further explanatory narrative for those measures where targets had not been met or where
performance had not improved in 2023/2024 was attached as Appendix 2 to the report.
4

Page 5

A suite of public performance reports, focusing on key areas of Council business, would
continue to be prepared to complement the APS.  Officers would continue to review the
presentation of the APS and Public Performance Reporting generally to take account of any
changes arising.  The APS for 2023/2024 would become live on the Council’s website in
September 2024, significantly in advance of the statutory deadline of 31 March 2025. 
The Forum decided: that the report and the content of the Annual Performance
Spotlights 2023/2024, which would go live on the Council’s
website prior to the statutory deadline of 31 March 2025,
be noted. 
[Reference: Minutes of 8 August 2023 (Paragraph 4)] 
5 South Lanarkshire Council/South Lanarkshire Leisure and Culture - Vision for
Future Relationship 
A joint report dated 9 August 2024 by the Executive Directors (Community and Enterprise
Resources), (Finance and Corporate Resources) and (Housing and Technical Resources) was
submitted on the future commissioning of leisure and culture services between South
Lanarkshire Council (SLC) and South Lanarkshire Leisure and Culture (SLLC). 
The Council and SLLC had operated a successful partnership for many years, however, given
the current financial challenges, SLLC had been required to consider what services could be
sustained in the light of the need to secure a balanced budget. 
Information was provided on a new longer-term and more sustainable approach which was in
line with the newly adopted governance model for SLLC and which recognised the challenging
financial context in which it was operating. 
The following 3 key workstreams had been identified, with their terms of reference attached as
appendices to the report:- 
 Strategic Commissioning Plan for SLLC
 Long-term Estate Strategy
 agreed financial relationship between SLC and SLLC 
The key aim of the Long-term Estate Strategy was to secure approval of a 10-year Strategy that
would direct investment into a reduced, higher-quality and energy efficient core estate.  An
assessment framework had been developed to ensure that the Strategy was informed by robust,
evidence-based data, as outlined in the report and detailed in Appendix 3 to the report. 
The workstreams would be overseen by a review board and the outcomes presented to
committee and the SLLC Board.  Ongoing meetings with the Council Leader, Chair of the SLLC
Board and associated Chief Executives would also take place throughout the development and
implementation of the workstreams.  Briefing sessions on the workstreams would be held for all
elected members and members of the SLLC Board. 
The Executive Director (Housing and Technical Resources) highlighted the following errors in
the appendices to the report:- 
 Appendix 1 at section 7 should have read that a report would be submitted to Council in
February 2025 and not 2024
 Appendix 2 at section 8 should have stated that the framework of key indicators would be
submitted for noting and not approval to this meeting of the Forum
5

Page 6

The Chief Executive, South Lanarkshire Leisure and Culture responded to a member’s question
in relation to the inclusion of legal obligations in respect of library services. 
The Forum decided: 
(1) that the workstreams’ terms of reference, together with the background to their
development, be noted; and 
(2) that the assessment framework to evaluate the future categorisation of SLC assets be
noted. 
6 Cross-Cutting Reviews – Update 
A report dated 6 August 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the cross-cutting reviews that were part of the Transformational Change
Programme for 2025/2026. 
At its meeting on 26 June 2024, the Council’s Executive Committee noted the Transformational
Change Programme that was required to drive continuous improvement and efficiencies, and
link into the Budget Strategy over the next 3 years. 
The foundation of the Transformational Change Programme would be a series of cross-cutting
reviews.  Information was provided on the first tranche of reviews noted below, with their terms
of reference attached as appendices to the report:- 
 Charging
 Procured Spend Review Phase 2
 Overtime
 Organisational/Management Structures
 Loans Charges – Repayment of Debt
 Fleet Management 
Information was also provided on other cross-cutting reviews that would progress into future
years as noted below:- 
 Digital Transformation/Customer Contact
 Property
 In-house and Procured Services
 Depot Rationalisation 
Further updates would be provided to the Forum. 
Having responded to members’ questions, the Executive Director (Finance and Corporate
Resources) also advised that information on overtime costs was reported to the Financial
Resources Scrutiny Forum and was publicly available on the Council’s website, however, could
be shared with members if required. 
The Forum decided: that the update on the cross-cutting reviews be noted. 
[Reference: Minutes of the Executive Committee of 26 June 2024 (Paragraph 9)] 
7 Urgent Business 
There were no items of urgent business.
6

Page 7

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 19 November 2024
Report by: Chief Executive  
Subject: Council Plan Connect 2022-2027: Quarter 2 Progress
Report 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
• provide the Council Plan Connect Quarter 2 Progress Report 2024/2025, for the
period 1 April 2024 to 30 September 2024
[1purpose]
2. Recommendations
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the Connect Quarter 2 Progress Report 2024/2025, summarised at
paragraph 4.5. and attached as Appendix 1 of this report, be noted; and
(2)  that the key achievements, as detailed at paragraph 4.6. of this report, be
noted. 
[1recs]
3. Background
3.1. The Council Plan Connect covering the period 2022-2027 was approved by the full
Council on 15 June 2022.  The plan sets out the Council’s vision, values, priorities
and outcomes for the five-year period. 
3.2. As part of the performance reporting arrangements introduced in 2007, it was agreed
that progress reports on the Council Plan would be provided at the mid-year point
(Quarter 2) and at the end of the financial year (Quarter 4).  This report provides a
summary of progress on Connect as at the end of Quarter 2, 30 September 2024. 
4. Quarter 2 Progress 2024/2025
4.1. The Council Plan offers flexibility, both at the Resource level and from one year to
the next, in the choice of actions and measures required to deliver the Council’s
outcomes.  Alongside this flexibility, however, comes the requirement to ensure that
the golden thread from Council Plan to Resource Plan remains unbroken. 
4.2. The reporting framework for the Council Plan identifies key measures within
Resource Plans which are taken and combined in a Connect report to provide a
balanced picture of Council performance against Connect outcomes. 
4.3. A total of 256 measures have been identified from the 2024/2025 Resource Plans. 
Of those, 61 (24%) have been nominated as key strategic measures for reporting
progress against Connect.  
3
7

Page 8

4.4. Progress to date against these measures is contained in the Connect Quarter 2
Performance Report 2024/2025, attached as Appendix 1.  This report has been
produced from the Council’s performance management reporting system IMPROVe,
and uses a traffic light format with the following definitions to give a status report on
each measure: 
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when
available
Contextual Included for ‘information only’, to set performance information in
context 
4.5. To ensure adequate scrutiny of performance across all Resources, individual
Resource Committees receive details of all ‘red’ measures relating to that Resource
including management actions, where applicable. In addition, the Forum may
consider those measures across all Resource Plans reporting a ‘red’ and/or ‘amber’
status. 
The overall summary of Connect progress to date is as follows:     
Status Measures
Statistical  Project  Total %
Blue n/a 1 1  2%
Green  24 19 43 70%
Amber  4 4 8 13%
Red     2 1 3 5%
Report later/Contextual 5 1 6  10%
Totals  35 26 61 100%
Data as at 31 Oct 2024 
4.6. Key achievements to date against each of the six Connect Outcomes have been
summarised in the following tables: 
4.6.1.
Connect
Outcome
Communities and Environment 
Number of
measures
Blue Green Amber Red Report later Total
0 12 4 0 1 17
Achievements The percentage of household waste sent to landfill in the period January to June
2024 was 1.64%, remaining well below (better than) the 5% target.
The percentage of properties with Full Fibre Connection has increased to 50.6%,
exceeding the annual target of 43%
Primary school meal uptake for the period April to September was 70%,
exceeding target (66%). The new menu started on 26 August 2024.
8

Page 9

A programme of bridge and other structure projects have continued to be
implemented, including the £9.4m replacement of the Clyde Bridge which was
completed in Quarter one.
Stewartfield Way/ East Kilbride Town Centre Enhancement - a report was
presented to Community and Enterprise Committee during April 2024 outlining
the revised project. Updated traffic modelling has been completed and approval
for the project's wider aims was obtained by the Glasgow City Region Chief
Executives' Group in June 2024. A further report will be taken to Committee prior
to completion/ submission of the Outline Business Case (OBC) to the Glasgow
City Region (GCR) Programme Management Office (PMO).
South Lanarkshire University Health and Social Care Partnership (SLUHSCP)
continues to embed Care Opinion across all services and recently dovetailed
with public engagement sessions held to develop the next Strategic
Commissioning Plan 2025-28.
Recent statistics have shown that, in its early stages, the SLUHSCP has far
exceeded the national average with record levels of engagement. In the first
quarter of 2024-2025, South Lanarkshire University HSCP received 171 stories
from members of the public. 92% of these stories were positive and received
218 responses from staff and services and 91.2% of stories were responded to
within 7 days. Moreover, these stories have been read more than 7,463 times. 
4.6.2.
Connect
Outcome
Education and Learning
Number of
measures
Blue Green Amber Red Report later Total
0 3 1 0 0 4
Achievements SQA examination results for the 2024 exam diet were published by SQA on 6
August 2024. SLC pupils were presented for over 80,000 qualifications at National
5, Higher and Advanced Higher levels. When compared with National pass rates
(based on entries in other Local Authorities) attainment levels in SLC are above
the National Pattern.
An increasing percentage of our primary schools are now offering play-based
learning at each stage between Primary 1-3. There is also one establishment
implementing this approach across a P1-4 class.
Primary 1: Approximately 79.4%
Primary 2: Approximately 53.7%
Primary 3: Approximately 24.1%
Mobilize Music Project.  To September 2024, the project has engaged almost
150 young people aged between 12 and 25 in music-based learning
opportunities. These free opportunities have included access to music rehearsal
spaces, recording sessions for our annual album project where young people
write and record original songs for release, live performance opportunities
through our monthly gig nights and open mic nights, access to music tuition on
drums, guitar, ukulele and vocals, and group singing as part of our choir group.  
Many learners have reported increased aspirations and have progressed to
further learning opportunities such as further education courses at College and
University or progressing to engaging in live performance at music venues in
Glasgow and beyond. Learners also report increases in self-esteem and
confidence, and they report that participation in the project results in much
improved mental wellbeing 
9

Page 10

4.6.3.
Connect
Outcome
Health and Wellbeing
Number of
measures
Blue Green Amber Red Report later Total
0 4 0 1 4 9
Achievements The council’s affordable housing supply programme continues to increase the
supply of council homes across South Lanarkshire, with a focus on ensuring that
the new homes provide for changes in peoples need over the course of time. 
All applications for adaptations to Council homes were approved.
The Council has appointed a consultant to undertake an independent objective
review of council properties, including those operated by South Lanarkshire
Leisure and Culture (SLLC). At the same time, the £13m Transition Fund is
helping to modernise the leisure and culture asset base.
Formal grant funding from SPT to support active travel behaviour change
initiatives has been confirmed and a grant of £195,500 has been awarded. 
Scottish Government funding is being used to support air quality monitoring
activities as well as for active travel promotional campaigns, anti-idling
campaigns, and Eco Stars support for businesses that operate fleet which travel
through the South Lanarkshire area.
As at 30 September 2024, there were a total of 704 Looked After Children with
631 (90%) looked after in a community based setting.  This position has been
consistent since 1 April 2021 and reflects South Lanarkshire’s commitment to
shift the way care is delivered to Looked After Children, with continued support
to children and young people within the community.
In continuing to support carers, 1,762 co-produced assessments have been
approved which is in line with the service achieving the annual target of 3,000
assessments. 
SLC work on Cost of the School Day presented at the national Facing Up to
Poverty in Schools Network and highlighted as an example of good practice. 
4.6.4.
Connect
Outcome
Children and Young People
Number of
measures
Blue Green Amber Red Report later Total
0 3 0 0 0 3
Achievements An individual housing plan was developed for all young people leaving care
As at September 2024, South Lanarkshire continues to have no under 18s in
Polmont Young Offenders Institution. This has been the case since September
2021 and reflects the success of the proactive Whole System Approach, use of
secure care (where necessary) and robust multi agency community risk
management plans.
Adult Literacy and Numeracy Team
• Over 200 adults have been supported to increase their skills in literacy and
numeracy using the Social Practice Model of adult learning where learning is
contextualised according to a learner’s interests, aspirations and goals. 
Additionally, 25% of these have gone on to successfully achieve accredited
qualifications in SQA Core Skills (Communication / Numeracy / ICT) or REHIS
(food safety).
• 10% of adult literacies learners advanced to further education or training, while
5% secured employment, demonstrating the effectiveness of adult literacy and
numeracy provision in facilitating career progression for those furthest
removed from the labour market.
ESOL (English for Speakers of Other Languages): Over the period 189 ESOL
learners attended YFCL ESOL Provision across South Lanarkshire.     
10

Page 11

Multiply on Tour successfully engaged 581 adults in a series of summer events,
highlighting the prevalence of numeracy in everyday life and promoting
opportunities for adult learning. 
4.6.5.
Connect
Outcome
Housing and Land
Number of
measures
Blue Green Amber Red Report later Total
0 10 0 2 0 12
Achievements Through its Affordable Housing Supply Programme, the council is on track to
deliver a further 50 new council homes at Brackenhill Farm, Hamilton during
2024-2025. 
Planning and pre-development work is also underway to deliver over 250 new
homes across eight sites in East Kilbride, Hamilton, Larkhall and Cambuslang
throughout 2025-26. 
In addition, progress is being made to acquire a further 150 homes this year
through the Market Purchase Scheme, aiming to meet immediate housing need
in priority areas.
99% of reactive repairs were completed right first time
63.8% of lets to urgent homeless (UH) households, ensuring those with the
highest housing need are prioritised 
4.6.6.
Connect
Outcome
Our Economy
Number of
measures
Blue Green Amber Red Report later Total
1 8 3 0 1 13
Achievements To date 1,340 participants have been supported on employability programmes,
well on the way to reaching the 1,500 target.
Preparation of the Evidence Report which forms the first stage of the Local
Development Plan 3 (LDP3) has commenced. An engagement strategy has
been developed and has been incorporated in the 2024 Development Plan
Scheme which received approval at the Planning Committee in May 2024. 
4.6.7 In addition to working towards the six Connect Outcomes, the Council will continually
aim to improve and ensure effective and efficient use of resources, and that business
will be conducted with integrity and transparency and will operate to the highest
standards.  In order to monitor and report progress against these values, Resource
outcomes have also been identified, under the heading Delivering the Plan and
achieving Best Value. Related achievements to date are summarised in the following
table:   
Delivering the Plan and achieving Best Value 
Number of
measures
Blue Green Amber Red Report later Total
0 3 0 0 0 3
Achievements Against an extremely challenging set of socio-economic circumstances,
positive performance was achieved: the percentage of gross rent arrears
(current and former) reduced over the same period from 8.00% in 2023-24
(Q4) to 7.26% in Quarter 2.
With assistance from the Local Government Improvement Service, the
council developed an SLC-focused LGBF dashboard reflecting the council's
strategic outcomes as set out in the Council Plan, Connect.  Following
presentation at the Performance and Review Scrutiny Forum (PRSF) on 28
May 2024, the dashboard was made available to the public via a link on the
performance pages of the council's website.
11

Page 12

Oracle Fusion - HR and Payroll modules went live August 2024.
Customer Service Excellence retained for 2024 following assessment of
Bereavement Services. 
4.7. Report later 
Measures in the quarterly progress reports which are not blue, red, amber or green
can be assigned a status of ‘report later’ or ‘contextual’. A further analysis introduced
to aid scrutiny of performance, is to follow up the measures in these categories from
the previous year’s Quarter 4 report. There were NO Report later measures in the
Quarter 4 2023/24 report, so no further action is required. 
5.  Employee Implications
5.1. The outcomes noted within the Council Plan will inform the Resource Plans and in
turn the Performance Appraisal process for individual employees. 
6. Financial Implications
6.1. Provision for meeting the Council Plan’s outcomes is reflected in both the Revenue
and Capital budgets, and longer term, within the framework of the council’s approved
Financial Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising from
this report. 
7.2. The Council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change as
a key area of focus for 2024/2025. 
8. Other Implications
8.1 A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9. Equality Impact Assessment and Consultation Arrangements
9.1 Equality Impact Assessments will be undertaken in line with the various actions
within Connect as appropriate. 
9.2 Many of the priorities, outcomes and actions detailed within the plan reflect ongoing
work programmes implemented to address local and national priorities.  Extensive
consultation, therefore, has already taken place in relation to a significant proportion
of the outcomes and actions outlined in the plan.   
Paul Manning
Chief Executive 
31 October 2024 
12

Page 13

Link(s) to Council Values/Priorities/Outcomes 
The Council Plan 2022-2027 reflects the overarching vision of South Lanarkshire Council and
details its values, priorities and outcomes, including links to the Community Planning
Partnership. 
Previous References
Connect Quarter 2 Progress Report 2023/2024 – Performance and Review Scrutiny Forum
of 5/12/23 
List of Background Papers
Council Plan Connect 2022-27: approved by South Lanarkshire Council on 15 June 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Extension: 4904  (Phone: 01698 454904)
E-mail: tom.little@southlanarkshire.gov.uk 
Performance: www.southlanarkshire.gov.uk/performance   
13

Page 14

14

Page 15

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 31 Oct 15:26
Quarter 2 : April 2024 - September 2024
(This represents the cumulative position to September 2024)
Performance Report 2024-25
South Lanarkshire Council
Connect
3
15

Page 16

IMPROVe - SLC Performance Management System Report printed on 31 Oct 15:26
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome / Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 6 2 0 1 9
Education and Learning 2 0 0 0 2
Health and Wellbeing 4 0 1 3 8
Children and Young People 1 0 0 0 1
Housing and Land 3 0 1 0 4
Our Economy 5 2 0 1 8
Delivering the plan and achieving best value 3 0 0 0 3
Total 24 4 2 5 35
16

Page 17

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of road casualties in South
Lanarkshire during 2024.
Provisional casualty figures are available for first seven calendar months
of 2024, when there were 211 casualties. Of these, there was 1 fatal
casualty, 79 serious casualties and 131 slight casualties. There were 0
child fatal casualties, 5 children seriously injured and 23 children slightly
injured.
These can be compared with the same period in 2023, when there were
220 casualties. Of these, there were 4 fatalities, 69 serious casualties
and 147 slight casualties. For children in 2023, there were 0 child fatal
casualties, 11 children seriously injured and 15 children slightly injured.
It should be noted that traffic volumes have now returned closer to
pre-Covid levels which is reflected in the casualties numbers.
Amber 370 211 254 284 370
Percentage of household waste sent to
landfill in 2024
This measure is reported per calendar year and the latest figures relate
to quarter two, from April to June 2024 (1.64%). While this figure
remains well below the target to stay under 5%, a planned waste outage
tonnage was evident in May/June 2024, meaning that the Energy from
Waste facility in Dunbar was closed for planned maintenance and a
relatively small amount of waste was therefore diverted to landfill.
The year to date figure is 1% and remains significantly lower than the
annual target of 5%.
Green 5.00% 1.00% 8.66% 1.84% 1.50%
Evidence the use of recycled stock as a
percentage of all Equipu activity.
In quarter 2, 1,092 items of equipment were issued, of which 26% (281)
were recycled, the target of 10% has been achieved for the reporting
period.
To date, 522 items have been recycled (27%) from a total of 1,959
items.
Assessment staff continue to select recycled items when available as a
first choice for all authorised requests.  Additionally, Equipu and
assessment staff continue to actively encourage people to return all
previously issued equipment to increase stock available for recycling.
Green 10% 27% 0% 0% 155,580%
Percentage of properties with Superfast
Broadband >30Mbps
Coverage has increased by 0.2% during quarter two, July to September
2024 compared to quarter one.
Green 99.0% 98.5% 97.0% 97.3% 97.9%
17

Page 18

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Land Audit Management System grounds
maintenance score
With a year to date figure of 72.0, the service is on course to achieve
annual target (72.0).
Green 72.0 72.0 71.3 72.0 72.0
Percentage of our road network that should
be considered for maintenance treatment
(Roads Condition Index).
This figure is derived from the Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year. The 2023-25 figures will be reported later in the
year.
The target figure of 31.9% is based on the results for the period
2022-24, a significant regression compared to the previous year.
Report Later 31.9% ------ 29.7% 30.8% 31.9%
Broad compliance with food law statutory
requirements secured in premises
Year to date 95% of food businesses (2,763) that have been inspected
were found to be broadly compliant with both food hygiene and food
standards legislation. This compliance figure continues to exceed the
annual target set for this measure.
Since the new food law rating scheme came into affect, local authorities
can focus resources on high risk and non-compliant businesses by
conducting more frequent inspections in these establishments.
Green 85.0% 95.0% 93.0% 96.0% 95.0%
Reduction in the Council carbon emissions
in 2023/24 compared to 2022/23 (previous
year)
The carbon emissions are reported a year behind, so we are currently
reporting on 2023/24 figures and note that the Council’s carbon
emissions reduced by 9.46% in comparison with 2022/23.
The target is to continue to reduce the Council's carbon emissions and
there is therefore no figure to enter as a target for this measure.
Green ------ ------ ------ ------ 9.5%
Page 3
18

Page 19

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of total household waste that is
recycled in 2024
This measure is reported per calendar year, so the calendar year to date
figure for January to June 2024 is 42.94% and is lower than the annual
target of 50%.
However, it is noted that the figure rose to 46.97% during the period
from April to June 2024.
The inability to recycle Waste Upholstered Domestic Seating (WUDS)
means that this type of waste goes to landfill, and is affecting the
percentage of total household waste that is recycled. However, it is not
possible to measure exactly what the impact is as the specific amount of
WUDS going to landfill is not recorded. The percentage of total
household waste that is recycled will continue to be monitored.
Amber 50.00% 42.94% 41.50% 41.20% 43.75%
Education and Learning
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of pupils entering positive
destinations (initial destinations)
2022/23 leaver data  included. 2023/24 data will be available in at
Quarter 4.
Green 96.5% 96.9% 96.2% 96.2% 96.9%
Percentage gap between pupils from the
least and most deprived areas entering
positive destinations
2022/23 leaver data  included. 2023/24 data will be available in at
Quarter 4.
Green -5.5% -2.9% 6.4% 6.1% 2.9%
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
No of households currently waiting for
adaptations to their home
Target achieved. Green 0 0 0 0 0
19

Page 20

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of new build that are wheelchair
accessible (RP)
To be reported at year end. Report Later 10.0% ------ ------ ------ 19.2%
Percentage of Justice Social Work reports
submitted to Court by the due date.
In quarter 2, 96% (413 out of 431) of Justice Social Work reports have
been submitted within timescale. This position has been maintained as
96% was reported for quarter 1 which still exceeds the 95% target for
this measure.
Green 95.0% 96.0% 99.0% 98.0% 98.0%
Percentage of reports submitted to the
Children’s Reporter within agreed
timescales.
In quarter 2, 52% (43 out of 83) of reports submitted to SCRA were
submitted within timescales. This shows a decrease in performance
from 58% in quarter 1 which is below the 75% target.  The year-to-date
performance is 55%.
To address this, monthly meetings are now taking place with locality
Fieldwork Managers and representatives from the Scottish Children's
Reporters Administration, providing an opportunity for the Reporter to
flag up reports early.  Further actions taken to address improvement
include early tracking of reports by Service Managers, and improved
staffing levels which has been a locality improvement activity for all
front-line managers in Children and Families.  We are confident that with
the above measures in place, the target will be met within the next
quarter.
Red 75.0% 55.0% 82.0% 77.0% 53.0%
20

Page 21

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of statutory supervising officer
visits completed within timescale for local
authority welfare guardianship orders.
In quarter 2, there was a total of 62 local authority welfare guardianship
visits due with 85% (53) being completed on time. The decrease in this
quarter is noted when compared to the quarter 1 position of 94%,
however target has still been achieved.
To date, there was a total of 125 local authority guardianship visits due
with 91% (114) being completed in time.
Performance reports remain available to the locality teams providing
current performance levels.
Green 75% 91% 94% 93% 94%
Percentage of statutory supervising officer
visits completed within timescale for private
welfare guardianship orders.
In quarter 2, there was a total of 653 private welfare guardianship visits
due with 85% (557) being completed on time. An increase in this quarter
is noted when compared to the quarter 1 position of 81%, target has
been achieved.
To date, there was a total of 1,294 private guardianship visits due with
84% (1,093) being completed in time.
Performance reports remain available to the locality teams providing
current performance levels.
Green 75% 84% 95% 93% 92%
Percentage of children and young people
attending primary school
Report to be provided at Quarter 4. Report Later 93.0% ------ 0.0% 0.0% 0.0%
Percentage of children and young people
attending secondary school
Report to be provided at Quarter 4. Report Later 89.0% ------ 0.0% 0.0% 0.0%
21

Page 22

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Children and Young People
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of our care experienced
children and young people accommodated
in residential placements.
As at 30 September 2024, there were a total of 708 Looked After
Children, 637 (90%) were looked after in a community setting and 71
(10%) were looked after in a residential setting including local authority
houses, secure accommodation and residential schools, this position
has been maintained since 2021.
This reflects South Lanarkshire’s commitment to shift the way care is
delivered to Looked After Children, with continued support to children
and young people within the community.
Green 10.0% 10.0% 10.0% 10.0% 10.0%
Housing and Land
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of lets to Urgent housing (UH) need
households (RP)
Target achieved. Green 55.0% 63.8% 53.5% 58.1% 62.9%
% of new tenancies sustained for more
than a year for all lets (SSHC) (RP)
Tenancy sustainment has remained strong within the quarter 2 and
target achieved.
Green 88.00% 93.60% 93.40% 92.00% 92.20%
% of Housing Options interventions where
Homelessness prevented (RP)
As at quarter 2, 356 (57.42%) homeless cases prevented. The operating
context in relation to the prevention of homelessness remains extremely
challenging. The prevailing socio-economic conditions continues to
adversely impact upon the ability to prevent homelessness during
2024/25. This trend has been mirrored nationally.
Red 70.0% 57.4% 73.5% 65.9% 60.8%
% of response repairs completed on time Target achieved. Green 90.0% 96.5% 99.1% 95.3% 97.0%
Our Economy
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of participants supported via
council-operated employability
programmes
To date, 1,340 participants have been supported on employability
programmes.
Green 1,500 1,340 1,934 1,687 2,663
22

Page 23

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Our Economy
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of participants accessing further
education or training
To date, 355 participants have moved into further/higher education or
other formal training programmes following employability support.
Green 400 355 219 536 870
Number of business support interventions
per annum by Economic Development
(grants, loans or advice)
This year represents a transition for the Business Gateway changing
from a contract based, external provider model to an in house model.
Since this change a decision was made that all referrals for business
advice be referred directly to the Business Gateway and from now on
they will be the public facing organisation for business support in South
Lanarkshire.
The previous model was target driven around the number of business
engagements which diluted the effectiveness of service delivery.
Through a revised customer focused service approach appropriate
target levels will be established through this first year of altered service
delivery.
Amber 800 298 2,679 1,615 829
Increased value of sales generated by
businesses as a direct result of Economic
Development intervention
The figures for 2021/22 and 2022/23 reflect the particularly high volume
of engagement with businesses, seeking to invest in business recovery
and growth following the effect of Covid. Going into 2023/24 there
remained legacy grants that went on to be processed during 2023/24
resulting in a higher value for that financial year.
The 2024/25 target and performance figures reflect the expected
number of engagements in more stable economic conditions. During
April to September 2024 there were two grants being delivered;
Business Growth Grant and the Micro Business Grant and as a result
the annual target has been exceeded. The total value of sales as a
result of these grants is £8.751m.
Green £5.000m £8.751m £22.107m £13.113m £14.496m
23

Page 24

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Our Economy
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of new South Lanarkshire
business starts supported by Business
Gateway
This year represents a transition for the Business Gateway, changing
from a contract based external provider model, to an in house model
which will reflect a more customer focused, rather than target driven,
delivery model.
This first year target and performance reflects the two months of
transition when there was a physical move and then employee training.
The target has been adjusted to reflect expectations over a 10 month
period.
Amber 500 99 ------ 520 499
Number of jobs created or sustained per
annum as a direct result of Economic
Development intervention
Business Gateway remain on track to reach the target for the current
year.
The figures for 2021/22 and 2022/23 reflect the particularly high volume
of engagement with businesses, seeking to invest in business recovery
and growth following the effect of Covid. Going into 2023/24 there
remained legacy grants that went on to be processed during 2023/24
resulting in a higher number of jobs being created or sustained.
The 2024/25 target and performance figures reflect the expected
number of engagements in more stable economic conditions.
Green 500 297 1,095 1,256 646
Perecentage of procurement spend on
local enterprises
This is a local government benchmarking framework (LGBF) indicator.
The figure for 2023/24 will be reported as part of the LGBF framework in
early 2025.
Report Later ------ ------ 18 18 ------
Number of participants gaining sustainable
employment
To date, 325 participants have moved into employment following
employability support.  This includes Modern Apprenticeships, full/part
time employment.
Green 700 325 1,146 584 643
24

Page 25

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan Performance Indicators
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Customer Service Centre - % of calls
answered
Target exceeded Green 90.00% 93.00% 93.00% 94.00% 91.00%
Customer Service Centre – average queue
time (in seconds)
Target exceeded Green 300 212 158 134 252
Percentage of income due from Council
Tax received by the end of the year - in
year (incl water)
The annual Council Tax collection target for 2024/2025 has been set at
95.5%. Council Tax collection rate is currently 60.19%, ahead of target
by 0.06% and ahead of comparable performance in 2023/24 by 0.07%.
Green 95.50% 60.19% 95.54% 96.77% 95.70%
25

Page 26

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome / Theme Complete Green Amber Red Report later Total
Communities and Environment 0 6 2 0 0 8
Education and Learning 0 1 1 0 0 2
Health and Wellbeing 0 0 0 0 1 1
Children and Young People 0 2 0 0 0 2
Housing and Land 0 7 0 1 0 8
Our Economy 1 3 1 0 0 5
Delivering the plan and achieving best value 0 0 0 0 0 0
Total 1 19 4 1 1 26
26

Page 27

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Community Safety
priorities are achieved
Continue to support the Safer South Lanarkshire Board and
work with partners to contribute to tackling identified
community safety issues
A revised quarterly schedule of meetings meetings for the Safer South
Lanarkshire Board is now in place, aligning more closely with the
Police Scotland reporting schedule and allow timely scrutiny of
performance.
Work remains ongoing to complete the final evaluations of projects
previously funded from the Community Safety Budget, and will be
reported in 2025.
Green
Increase routes for
communities to
Increase the number of communities with their own
community-led neighbourhood plans
Nine neighbourhood plans are in place and being delivered upon. One
new plan for Whitehills in East Kilbride is in development.
Green
participate in decision
making and priority
setting
Implement new approaches to community involvement in
decision making such as a community Wishlist approach to
community benefits
The Community Wish List has continued to thrive, with 48 Community
Wishes received from a range of community groups across South
Lanarkshire. 10 Wishes have been answered, with a range of financial
donations, goods and materials, Christmas decorations, and food
items, totalling £11,690. to date this financial year, the project has
totaled over £21,000.
Green
Take forward IT strategic
developments
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements, including improved
availability and affordability of broadband and 4G/5G mobile
services across the council area
Revised business case developed and under consideration. Green
27

Page 28

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Lead by example and
influence area-wide
climate change and
sustainability action
Implement the Sustainable Development and Climate
change Strategy (2022-2027) Action Plan, and report
progress at quarter two and quarter four to Climate Change
and Sustainability Committee
Implementation of the Sustainable Development and Climate Change
(SDCC) Strategy and Action Plans is progressing in line with agreed
timescales. The quarter four update for the 2023/24 Action Plan was
presented to the Climate Change and Sustainability (CCS) Committee
in August 2024. The Action Plan for 2024/25 was also approved at this
Committee meeting. The quarter two update for the 2024/25 Action
Plan is expected to be presented to CCS Committee in December
2024.
Green
Prepare an Open Space
Strategy in partnership
with Glasgow and Clyde
Valley Green Network
Partnership and other
council services
Engagement on the findings following analysis of the Open
Space audit will be carried out during Q2 and will in turn be
used to inform the evidence report for the Local
Development Plan 3. It is anticipated that a draft Open
Space Strategy will be available early 2025 once the
Gatecheck of the Evidence Report has been completed.
Engagement on the Council's Open Space Strategy and Play
Sufficiency Assessment will be carried in quarter three of 2024/25. It is
anticipated that a draft Open Space Strategy will be reported to the
Planning Committee in September 2025, slightly later than first
indicated.
Amber
28

Page 29

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Deliver road and
transportation
infrastructure
improvements to
support new
developments, including
those undertaken as
part of the City Deal
Stewartfield Way and East Kilbride Town Centre Project
business case will be prepared in 2024
Stewartfield Way/ East Kilbride Town Centre Enhancement - a report
was presented to Community and Enterprise Committee during April
2024 outlining the revised project. Updated traffic modelling has been
completed and approval for the project's wider aims was obtained by
the Glasgow City Region Chief Executives' Group in June 2024.
City Region Cabinet also approved the scope of the project change
control on 6 August 2024.  This will allow individual Outline Business
Cases (OBCs) for Stewartfield Way and Town Centre proposals.  The
OBC for the Stewartfield Way part of the project has been submitted to
the Programme Management Office (PMO) for initial consideration and
thereafter, Cabinet approval on 5 November 2024.  The Council's
Executive Committee paper is also being scheduled for 13 November
2024.
Green
Produce a new Local
Transport Strategy for
South Lanarkshire to
support the National and
Regional Transport
Strategy as well as the
provisions, where
appropriate, of the
Transport Scotland Act
Draft Local Transport Strategy will be presented to
Committee in Autumn 2024
An initial draft structure of Local Transport Strategy (LTS) was
submitted to the Community and Enterprise Resource Committee in
April 2024. To allow for the strategy to take cognisance of the latest
Transport Scotland guidance issued in June 2024, consultation on the
draft Local Transport Strategy will now be undertaken in Autumn 2024,
with the draft LTS to be presented to Committee for approval,
potentially, in February 2025.
Amber
29

Page 30

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Education and Learning
Action Measures Comments/ Progress Status
Provide opportunities for
young people to
participate in
work-based learning
opportunities in the
senior phase
Deliver GradU8 and Foundation Apprenticeship programmes
in partnership with colleges to provide young people with a
range of work-based learning opportunities.
For 24/25 we have been able to develop a comprehensive
Work-based learning offer for pupils in their senior phase including
Foundation Apprenticeship and GradU8 programme places. We
continue to work with our key college partners South Lanarkshire
College, New College Lanarkshire and Glasgow Kelvin College. We
have expanded the Gradu8 offer to include additional frameworks in
horticulture and Travel & Tourism. Foundation Apprenticeships
continue to be delivered in partnership with South Lanarkshire College
and New College under the ‘South Lanarkshire FA consortium’ banner.
Green
Update the Council
Framework for Inclusion
guidance taking account
of The Morgan Review,
the Additional Support
for Learning Action Plan,
The Promise and
Getting it Right for Every
Child update
Embed the principles and practices in the Inclusion
Framework across schools, to improve outcomes for children
and young people, and provide a progress report to the
Education Resources Committee.
New Framework for Inclusion and Equality has been launched to all
Head Teachers at Inclusion Conference 2024. Progress report against
the framework will be submitted to the next Education Resources
Committee
Amber
Health and Wellbeing
Action Measures Comments/ Progress Status
Complete the roll out of
free school meals to all
primary children
All P6s and P7s to receive free school meals in line with
Scottish Government timescales
Awaiting confirmation from Scottish Government of when expansion of
free school meals for all primary six and seven pupils will be rolled out.
Report Later
30

Page 31

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Children and Young People
Action Measures Comments/ Progress Status
Focus on supporting
young people to
overcome any
disadvantage and take
forward our targets for
excellence and equity.
Locally identified stretch aims including Equity targets
focussed on the gap between learners in SIMD quintile 1 and
SIMD quintile 5 have been set, and we will report on
progress to the Education Resources Committee.
With current data still being validated by Scottish Government, we
currently have improved against our targets for numeracy and are
slightly behind in literacy in terms of closing the attainment gap.
In terms of attendance, the figures will be slightly skewed in favour of
the targets at this stage in the session, as it is taken accurately against
the current academic session which has significantly less openings at
this stage. This measure will reflect more accurately as the academic
year progresses.
With the trend of overall SCQF results Nationally being lower, this is
also reflected in our figures, albeit slightly better than the National
picture. This has had a small impact against our targets and work is
underway to continue to try and reduce the overall attainment gap.
Green
Sustain early years
uptake for vulnerable
two-year-olds to help
families benefit from
more flexible early
learning and childcare.
Continue to engage with a range of partners to increase
uptake of eligible 2-year-old places, and report on progress
to Education Resources Committee. More flexible Early
Learning and Childcare.
Work has taken place with the Scottish Government and DWP to issue
letters to families where they may meet the criteria for a funded 2 year
old place. Meetings have also taken place with Health Visiting Teams
to reconfirm the criteria to allow Health Visitors to provide advice to
parents around eligibility. At this time around 500 eligible 2 year old
children are accessing a place across local authority and funded
provider provision
Green
31

Page 32

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Housing and Land
Action Measures Comments/ Progress Status
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Complete quality assurance checks to monitor and ensure
compliance with care inspectorate standards. Each of the 34
sheltered housing complexes will be checked during 2024/25
with findings of completed checks reported on a quarterly
basis (RP)
On track for full assessment by year end, Quality Assurance to date
demonstrates high levels of compliance.
Green
Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement
Continue to deliver co-produced Site Masterplans at both
sites, reflecting council and resident priorities (RP)
Site masterplans for both sites continue to be discussed and updated
with residents.
Green
Physical regeneration
work in priority areas
Work with partners to bring 15 Long Term empty homes into
use by March 2025 (RP)
10 empty homes have been brought back during the reporting period. Green
Ensure effective
involvement with tenants
and other customer
groups as well as
understanding our
customer satisfaction
levels of key service
areas
Annual Scrutiny Programme 2024 developed June 2024 and
implemented by March 2025 (RP)
Annual scrutiny programme for 2024/25 has been developed in
collaboration with the Tenant Participation Co-ordination Group.
Green
32

Page 33

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Housing and Land
Action Measures Comments/ Progress Status
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP
and reported to Housing and Technical Resources
Committee (RP)
The council and its partners continue to make good progress by
increasing the number of new homes for social rent across South
Lanarkshire.  33 new build council properties have been completed
during this period and an additional 44 homes secured through the
council’s Market Purchase Scheme.
Green
Improve access to
settled accommodation
for homeless
households and other
priority groups such as
care experienced young
people and people
fleeing domestic abuse
and veterans
Continue to implement Rapid Rehousing Transition Plan
(RP)
5th and final RRTP annual review reported to committee, ongoing
actions incorporated into new Homeless Strategic plan.
Actions identified to address severe pressure on homelessness
services are being monitored closely ,and impact will be reported to
committee as part of annual review process.
Red
Improve energy
efficiency stock to help
address fuel poverty
Deliver Housing Investment Programmes to improve the
energy efficiency of existing council homes to reduce
household bills and contribute towards relevant net zero
targets
£33.506m of refurbishment works approved for 2024/25 of which
£6.5m is targeted towards energy efficiency works.
Green
Consult with community
organisations and
develop a Rural Action
Plan maximising existing
and future funding
through Community Led
Local Development and
Renewable Energy
Fund
Deliver the Rural Action Plan and report to Rural Task Force
in November 2024
Update report to be prepared in October 2024 for the rural task force
on delivery of the new priorities.
Green
33

Page 34

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Complete East Kilbride
Town Centre masterplan
and deliver initial actions
to enable the delivery of
realignment
Negotiate and agree terms of masterplan delivery
programme.  Deliver early projects to support programme of
securing change
Negotiations are ongoing in line with agreed targets. Regular updates
are being provided to senior officers and will be reported to Committee
at the appropriate time.
Green
Complete Hamilton
Town Centre masterplan
and deliver initial actions
to enable the delivery of
realignment
Negotiate and agree terms of masterplan delivery
programme.  Deliver early projects to support programme of
securing change
Following completion and approval of the masterplan, a delivery
structure and programme of activity will be finalised. Officers have
considered the broad principles of how each element can be delivered
and an appropriate funding model.
Key projects are:
Newcross Centre – closure and redevelopment of the centre.
Regent Centre Sale and partnership agreement - sale and
redevelopment of existing centre which is at the end of its useful life.
Bairds redevelopment – consider options for redevelopment
Town Square repurposing – refresh this vital public space for the future
Vogue redevelopment – consider options for redevelopment.
Negotiations are ongoing in line with agreed targets. Regular updates
are being provided to senior officers and will be reported to Committee
at the appropriate time.
Green
34

Page 35

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Promote sustainable
economic development
across South
Lanarkshire
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of the South Lanarkshire Economic Strategy (2022-2027)
Annual report was presented to Community and Enterprise Resource
Committee in April 2024.
Complete
Deliver the Levelling Up
Funded projects
Delivery of the Levelling Up Fund grant funded projects
through the Clydesdale Way and Shawfield Remediation with
a value of £6.7m in 2024-25
The final onboarding of both projects between the Council and the UK
Government, and Dumfries and Galloway and the UK Government,
have been delayed subject to review by the UK Government of spend.
Further information expected in the 30 October 2024 Budget
Statement.
Clydesdale Way: The procurement exercise for the  Project
Management Contract has concluded and the contract can be
awarded if/when the Levelling Up Fund (LUF) award is confirmed.
Shawfield: the Council continues to work closely with Clyde Gateway
who are fully sighted on the UK Government's (UKG's) position
regarding the LUF and the implications of the current UK Government
spending review.
Amber
Deliver effective
Employability Services
to support individuals
and business
Monitor and adjust the delivery plan agreed via the South
Lanarkshire Local Employability Partnership (SLLEP) and
Community Planning Partners
The annual investment plan was agreed in partnership with the Local
Employability Partnership (LEP) and submitted to Scottish
Government. The plan is reported quarterly and reviewed through
regular meetings of the LEP and operational sub-group.
Green
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 19 November 2024
Report by: Chief Executive  
Subject: Resource Plans - Red and Amber Results at Quarter 2,
2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
• provide the Forum with summary information on performance measures where
Resource Plans results at Quarter 2, 2024/2025 were recorded as either red or amber 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the detail relating to red and amber results be noted; and
(2) that remedial action or mitigation be noted. 
3. Background
3.1. Since 2011, the Performance and Review Scrutiny Forum has received a report focusing
on performance information where Quarter 2 Resource Plans results were recorded as
being either red or amber.  This approach enables a more targeted response to
performance reporting than providing reports on all Connect and Resource Plan
measures.  The definition relating to red and amber status is as follows: 
Status Definition
Red There has been major slippage against timescale or major shortfall against
target
Amber There has been minor slippage against timescale or minor shortfall against
target 
3.2. The information included within this report and Appendix 1 is a summary of the red and
amber results from the Quarter 2 Resource Plan progress reports.  The information in
respect of red and amber measures is presented to the Forum to enable more detailed
consideration and scrutiny as appropriate.
4
37

Page 38

3.3. In addition to working towards the six Connect Outcomes, the Council will continually aim
to improve and ensure effective and efficient use of resources, and that business will be
conducted with integrity and transparency and will operate to the highest standards.  In
order to monitor and report progress against these values, Resource outcomes have also
been identified, under the theme Delivering the Plan and achieving Best Value.     
4. Quarter 2 2024/2025 Red and Amber Results
4.1. In 2024/2025 there are 256 measures across all Resource Plans under the six Connect
Outcomes, and the theme Delivering the Plan and achieving Best Value.  The majority of
these (233 or 91%) were reported as blue/green/report later at Quarter 2, with the
remaining 23 measures reported as red or amber. 
4.2. Table 1 below provides a summary of the red and abmer results by Resource over the
last three years. 
Table 1 – Red and Amber performance results by Resource (as at 31 Oct 2024)
Resource Red Amber Total
22/23 23/24 24/25 22/23 23/24 24/25 22/23 23/24 24/25
Community
and
Enterprise
1 - 0 7 13 8 8 13 8
Education - - - 2  - 2 2  - 2
Finance
and
Corporate
1 - 2 2 3 3 3 3 5
Housing
and
Technical
2 - 2 1 8 1 3 8 3
Social
Work
- 1 4 2 4 1 2 5 5
Total 4 1 8 14 28 15 16 29 23 
4.3. There has been a slight decrease in the number of red/amber status measures reported
in comparison to the previous year. This is due in part to a continuing, comprehensive
review of measures and targets which has resulted in greater clarity in the results, which
facilitates assigning the most appropriate status. 
4.4. Table 2 below shows the red and amber results by Outcome/theme. 
Table 2 – Analysis per Outcome/theme: 2024-2025 (as at 31 Oct 2024)
Connect Outcome/theme Red Amber Total
Communities and environment 0 5 5
Education and learning - - -
Health and wellbeing 3 2 5
Children and young people - 1 1
Housing and land 2 1 3
Our economy - 3 3
Delivering the plan and achieving Best Value 3 3 6
Total 8 15 23 
38

Page 39

4.5. A detailed explanation on progress to date is included in Appendix 1:
statistical/quantitative measures are listed first, followed by project measures, all grouped
per Connect Outcome/theme. These explanations provide details surrounding the
circumstances which have given rise to the red/amber status, including unforeseen
changes in timescales or circumstances, or work being underway but not yet complete. 
Progress updates provide revised timescales for completion and management action,
where relevant. 
5. Next steps
5.1. The Forum is asked to note the detail included within Appendix 1. 
6. Employee Implications
6.1. The Outcomes noted in the Council Plan will inform the Resource Plans and in turn the
Performance Appraisal process for individual employees. 
7. Financial Implications
7.1. Provision for meeting the Council Plan’s Outcomes is reflected in both the Revenue and
Capital budgets, and longer term, within the framework of the Council’s approved
Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. Any Climate Change, Sustainability and Environmental implications relating to this report
have been considered as part of the Resource Planning process. 
9. Other Implications
9.1. None. 
9.2. In respect of risk, the detail of this report will provide the Corporate Management Team
with targeted performance information on a timely basis to allow it to adequately perform
its scrutiny role. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Equality Impact Assessments will be undertaken in line with the various actions in
Connect as appropriate This report does not introduce a new policy, function or strategy,
or recommend a change to an existing policy, function or strategy and, therefore, no
impact assessment is required. 
10.2. Many of the Outcomes and actions detailed within Connect and the Resource Plans
reflect ongoing work programmes implemented to address local and national priorities. 
Extensive consultation, therefore, has already taken place in relation to a significant
proportion of the outcomes and actions outlined in the Plan. 
Paul Manning
Chief Executive 
31 October 2024 
39

Page 40

Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving 
Previous References 
• Report to Performance and Review Scrutiny Forum 31 May 2011: Performance and
Review Scrutiny Forum - Performance Reporting Arrangements 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:-
Tom Little, Head of Communications and Strategy  
Ext: 4904   (Tel: 01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk 
40

Page 41

IMPROVe - SLC Performance Management System Report printed on 31 Oct 15:30
Quarter 2 : April 2024 - September 2024
South Lanarkshire Council
All Resource Plan - Red and Amber
Measures Report
(This represents the cumulative position to September 2024)
Performance Report 2024-25
4
41

Page 42

IMPROVe - SLC Performance Management System Report printed on 31 Oct 15:30
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 7 3 0 1 11
Education and Learning 3 0 0 13 16
Health and Wellbeing 14 1 3 1 19
Children and Young People 2 0 0 0 2
Housing and Land 9 1 1 8 19
Our Economy 6 2 0 1 9
Delivering the plan and achieving best value 22 3 1 3 29
Total 63 10 5 27 105
42

Page 43

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Communities and Environment
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of road casualties in South
Lanarkshire during 2024.
Provisional casualty figures are available for first seven calendar months
of 2024, when there were 211 casualties. Of these, there was 1 fatal
casualty, 79 serious casualties and 131 slight casualties. There were 0
child fatal casualties, 5 children seriously injured and 23 children slightly
injured.
These can be compared with the same period in 2023, when there were
220 casualties. Of these, there were 4 fatalities, 69 serious casualties
and 147 slight casualties. For children in 2023, there were 0 child fatal
casualties, 11 children seriously injured and 15 children slightly injured.
It should be noted that traffic volumes have now returned closer to
pre-Covid levels which is reflected in the casualties numbers.
Amber 370 211 254 284 370
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of total household waste that is
recycled in 2024
This measure is reported per calendar year, so the calendar year to date
figure for January to June 2024 is 42.94% and is lower than the annual
target of 50%.
However, it is noted that the figure rose to 46.97% during the period
from April to June 2024.
The inability to recycle Waste Upholstered Domestic Seating (WUDS)
means that this type of waste goes to landfill, and is affecting the
percentage of total household waste that is recycled. However, it is not
possible to measure exactly what the impact is as the specific amount of
WUDS going to landfill is not recorded. The percentage of total
household waste that is recycled will continue to be monitored.
Amber 50.00% 42.94% 41.50% 41.20% 43.75%
43

Page 44

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Communities and Environment
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of streets found to be
acceptable during Litter Monitoring
Systems Surveys
Surveys are undertaken three times per year. The figure to date reflects
the results from the first survey only.
With two more surveys to be undertaken over the year, there is still
potential that the target at year end will be met.
Amber 92.00% 89.40% 92.10% 92.30% 92.00%
44

Page 45

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of reports submitted to the
Children’s Reporter within agreed
timescales.
In quarter 2, 52% (43 out of 83) of reports submitted to SCRA were
submitted within timescales. This shows a decrease in performance
from 58% in quarter 1 which is below the 75% target.  The year-to-date
performance is 55%.
To address this, monthly meetings are now taking place with locality
Fieldwork Managers and representatives from the Scottish Children's
Reporters Administration, providing an opportunity for the Reporter to
flag up reports early.  Further actions taken to address improvement
include early tracking of reports by Service Managers, and improved
staffing levels which has been a locality improvement activity for all
front-line managers in Children and Families.  We are confident that with
the above measures in place, the target will be met within the next
quarter.
Red 75.0% 55.0% 82.0% 77.0% 53.0%
45

Page 46

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of people on CPO unpaid work
requirement seen within five working days
by their case manager.
In quarter 2, 67% (113 out of 169) Community Payback Orders with an
Unpaid Work requirement were inducted within 5 working days, which is
a decrease in performance from 73% in quarter 1. In the year to date,
70% (243 out of 347) orders were inducted within timescales.
96% (334 out of 347) of orders have been inducted, whilst 4% remain
outstanding, late and not seen reasons include service users not
attending scheduled appointment, illness, paid employment or a return
to custody.
In quarter 2, 50% of Unpaid Work requirements were level 1 orders
where there is no justice social work report requested by the court prior
to the order commencing and therefore the service is unable to engage
with the service user before court appearance or monitor their outcomes
in court. This is an increase from 42% in quarter 1.
A text reminder service has been implemented for all unpaid work
service users to encourage attendance at unpaid work. This is
supported by 4 weekly reviews for all non-attenders as standard,
regardless of circumstances, to ensure robust management of the
order(s).
Red 75.0% 70.0% 68.0% 69.0% 72.0%
46

Page 47

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of people starting their
placement within seven days of a CPO
unpaid work.
In quarter 2, 65% (110 out of 169) Community Payback Orders with an
Unpaid Work requirement commenced within 7 working days, this is a
decrease in performance from 71% in quarter 1. In the year to date, 68%
(236 out of 347) orders were inducted within timescales.
To date, 96% (334 out of 347) placements have commenced, whilst 4%
remain outstanding, late and not seen reasons include service users not
attending scheduled appointment, illness, paid employment or a return
to custody.
In quarter 2, 50% of Unpaid Work requirements were level 1 orders
where there is no justice social work report requested by the court prior
to the order commencing and therefore the service is unable to engage
with the service user before court appearance or monitor their outcomes
in court. This is an increase from 42% in quarter 1.
A text reminder service has been implemented for all unpaid work
service users to encourage attendance at unpaid work. This is
supported by 4 weekly reviews for all non-attenders as standard,
regardless of circumstances, to ensure robust management of the
order(s).
Red 75.0% 68.0% 65.0% 67.0% 70.0%
47

Page 48

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of care at home hours reduced
through Home First intervention.
In quarter 2, 200 Home First care episodes were successfully
completed, with care packages being reduced by 28% when comparing
hours required at start of intervention to end. This is an increase in
performance from 27% in quarter 1. The number of completed episodes
decreased by 6% from 212 episodes in quarter 1 to 200 in quarter 2.
To date, 419 Home First episodes have been successfully completed,
with care packages being reduced by 28%.
The service has again seen an increased number of service users with
more complex needs over the quarter. This has resulted in reduced
opportunities for reablement and rehabilitation with service users and
has subsequently led to a reduction in the hours reduced at the end of
the Home First journey. A revised eligibility criteria is currently being
finalised to maximise the potential benefits of the service for service
users.
Amber 30.0% 28.0% 0.0% 0.0% 0.0%
Housing and Land
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
No of times we did not, meet our obligation
to complete the annual gas safety check by
annual anniversary date (SSHC)
5 services beyond target date, all now complete.  Issues identified have
now been resolved.
Amber 0 5 1 20 82
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of Housing Options interventions where
Homelessness prevented (RP)
As at quarter 2, 356 (57.42%) homeless cases prevented. The operating
context in relation to the prevention of homelessness remains extremely
challenging. The prevailing socio-economic conditions continues to
adversely impact upon the ability to prevent homelessness during
2024/25. This trend has been mirrored nationally.
Red 70.0% 57.4% 73.5% 65.9% 60.8%
48

Page 49

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Our Economy
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of business support interventions
per annum by Economic Development
(grants, loans or advice)
This year represents a transition for the Business Gateway changing
from a contract based, external provider model to an in house model.
Since this change a decision was made that all referrals for business
advice be referred directly to the Business Gateway and from now on
they will be the public facing organisation for business support in South
Lanarkshire.
The previous model was target driven around the number of business
engagements which diluted the effectiveness of service delivery.
Through a revised customer focused service approach appropriate
target levels will be established through this first year of altered service
delivery.
Amber 800 298 2,679 1,615 829
Number of new South Lanarkshire
business starts supported by Business
Gateway
This year represents a transition for the Business Gateway, changing
from a contract based external provider model, to an in house model
which will reflect a more customer focused, rather than target driven,
delivery model.
This first year target and performance reflects the two months of
transition when there was a physical move and then employee training.
The target has been adjusted to reflect expectations over a 10 month
period.
Amber 500 99 ------ 520 499
49

Page 50

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Money Matter Advice – to write off 20% of
all debt dealt with by bankruptcy or creditor
write offs (New)
This is a new target set for 2023/24 with 20% based on the 23% that
was achieved in 2022/23. The level of debt written off by creditors for
clients is dependent on a variety of factors including the type of debt
involved and the range of debt solutions available. Money Matters offer
options on debt solutions to support the client and explain the
implications of each, however the selection of any one solution is a
decision for the client to take. Also, once a debt solution is selected,
there can be a time delay between verifying the debt and a successful
solution being implemented and this can also impact performance.
Red 20.0% 15.3% 0.0% 0.0% 0.0%
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Liquor licensing processing target - 97%
within service targets
Whilst the PI has not been met over this Quarter, performance has
improved on a monthly basis, with July being 61%, August 84% and
September 94%. We will continue to ensure that priority is given to
urgent, time critical service requests..
Amber 97.0% 79.0% 92.0% 96.0% 94.0%
Pay invoices within the target of 28 days Payment of invoices continues to make steady progress since Oracle
Fusion went live on 1 April: the Payables team continue to work closely
with Resources to improve performance on invoice holds
Amber 92.5% 91.0% 93.4% 91.7% 94.0%
Registration processing target - 97.5%
within service targets
Monthly figures are improving however running totals are still below the
target. Team Leaders have been reminded to allocate tasks depending
on the nature of the business within performance targets where
possible.
Amber 97.5% 89.0% 93.0% 99.0% 99.0%
50

Page 51

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 1 30 2 0 2 35
Education and Learning 0 4 0 0 1 5
Health and Wellbeing 0 11 1 0 7 19
Children and Young People 2 15 1 0 2 20
Housing and Land 7 34 0 1 0 42
Our Economy 2 12 1 0 0 15
Delivering the plan and achieving best value 1 8 0 2 4 15
Total 13 114 5 3 16 151
51

Page 52

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Action Measures Comments/ Progress Status
Prepare an Open Space
Strategy in partnership
with Glasgow and Clyde
Valley Green Network
Partnership and other
council services
Engagement on the findings following analysis of the
Open Space audit will be carried out during quarter two
and will in turn be used to inform the evidence report for
the Local Development Plan 3. It is anticipated that a
draft Open Space Strategy will be available early 2025
once the Gatecheck of the Evidence Report has been
completed.
Engagement on the Council's Open Space Strategy and Play
Sufficiency Assessment will be carried in quarter three of 2024/25.
It is anticipated that a draft Open Space Strategy will be reported
to the Planning Committee in September 2025, slightly later than
first indicated.
Amber
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Produce a new Local
Transport Strategy for
South Lanarkshire
Draft Local Transport Strategy will be presented to
Committee in Autumn 2024
An initial draft structure of Local Transport Strategy (LTS) was
submitted to the Community and Enterprise Resource Committee
in April 2024. To allow for the strategy to take cognisance of the
latest Transport Scotland guidance issued in June 2024,
consultation on the draft Local Transport Strategy will now be
undertaken in Autumn 2024, with the draft LTS to be presented to
Committee for approval, potentially, in February 2025.
Amber
52

Page 53

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Health and Wellbeing
Ensure inclusion, equity and equality are at the heart of what we do
Action Measures Comments/ Progress Status
Update the Council
Framework for Inclusion
guidance taking account
of The Morgan Review,
the Additional Support
for Learning Action Plan,
The Promise and
Getting it Right for Every
Child update
Embed the principles and practices in the Inclusion
Framework across schools, to improve outcomes for
children and young people, and provide a progress
report to the Education Resources Committee.
New Framework for Inclusion and Equality has been launched to
all Head Teachers at Inclusion Conference 2024. Progress report
against the framework will be submitted to the next Education
Resources Committee
Amber
Children and Young People
Ensure inclusion, equity and equality are at the heart of what we do
Action Measures Comments/ Progress Status
Provide training for
teaching and ELC staff
to ensure progression
and a transference of
skills to the classroom
enabling them to better
meet the needs of
learners with greater
complexity in line the
Morgan Review.
Report on the progress on the training programme
provided through the Additional Support Needs
Continued Professional Development hub.
Progress has been assessed and relayed to all schools at
Inclusion Conference. Easier ways to engage and a map of the
hub has been provided to improve engagement.
Amber
53

Page 54

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Housing and Land
Improve outcomes for households experiencing homelessness, including access to settled accommodation
Action Measures Comments/ Progress Status
Improve access to
settled accommodation
for homeless
households and other
priority groups such as
care experienced young
people and people
fleeing domestic abuse
and veterans
Continue to implement Rapid Rehousing Transition
Plan (RP)
5th and final RRTP annual review reported to committee, ongoing
actions incorporated into new Homeless Strategic plan.
Actions identified to address severe pressure on homelessness
services are being monitored closely ,and impact will be reported
to committee as part of annual review process.
Red
54

Page 55

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Deliver the Levelling Up
Funded projects
Delivery of the Levelling Up Fund grant funded projects
through the Clydesdale Way and Shawfield
Remediation with a value of £6.7m in 2024-25
The final onboarding of both projects between the Council and the
UK Government, and Dumfries and Galloway and the UK
Government, have been delayed subject to review by the UK
Government of spend. Further information expected in the 30
October 2024 Budget Statement.
Clydesdale Way: The procurement exercise for the  Project
Management Contract has concluded and the contract can be
awarded if/when the Levelling Up Fund (LUF) award is confirmed.
Shawfield: the Council continues to work closely with Clyde
Gateway who are fully sighted on the UK Government's (UKG's)
position regarding the LUF and the implications of the current UK
Government spending review.
Amber
55

Page 56

IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024IMPROVe - SLC Performance Management System Report printed on Thursday 31 October 2024
Delivering the plan and achieving best value
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Deliver the
implementation
programme to replace
the existing Social Work
IT system within
timescale
Implement the new Social Work IT system by October
2024.
The Social Work case management system replacement project is
now working to a revised implementation date.  The additional time
will take into consideration the complexities around the finance
systems, data migration, data quality and ensure sufficient testing
is undertaken.  To date significant progress has been made as the
project continues to progress with the implementation.  A fully
comprehensive familiarisation and training plan is in place.  In
addition business change processes are in place to support all
services at go live.
Red
Take forward IT strategic
developments
Migrate to new Social Work Information system Positive progress has been made in the design, implementation
and testing of the new system, however data and test issues have
been identified in key areas of the project which have resulted in
significant pressures on the project plan. This has led to an
unavoidable delay to the current planned implementation date and
a project re-planning exercise is now taking place. Once the
re-planning exercise concludes a new implementation date will be
proposed and agreed.
Red
56

Page 57

Report
Agenda Item 
To: Performance and Review Scrutiny Forum
Date: 19 November 2024
Prepared by: Chief Executive 
Subject: Local Government Benchmarking Framework (LGBF)
2022/2023 Results and Action Plan - Update
1. Purpose of report 
1.1. The purpose of this report is to:- 
 provide the Forum with the updated Local Government Benchmarking
Framework (LGBF) results for 2022/2023 
2. Recommendations
2.1. The Forum is asked to approve the following recommendations:- 
(1) that the updated results, narrative and actions for 2022/2023 be noted;
(2) to note that South Lanarkshire Council’s updated LGBF results and
explanatory narratives will be published on the performance pages of the
Council’s website; and
(3) to note that South Lanarkshire’s LGBF Dashboard will be updated.
3. Background
3.1. The core purpose of the LGBF is to make comparisons on spend/cost, performance
and customer satisfaction results over several years and also between similar
councils. It comprises a suite of performance indicators, collated under the following
service headings:- 
 Children’s Services
 Corporate Services (ie support services)
 Adult Social Care
 Culture and Leisure Services
 Environmental Services
 Housing Services
 Corporate Assets
 Economic Development 
 Climate Change 
 Financial Sustainability 
3.2. These headings represent approximately 70% of local authority spend. 
3.3. Publication of the LGBF results is a statutory requirement set out by the Accounts
Commission in the Direction to local authorities as required by the Local
Government Act 1992. It is seen as a key part of Councils’ commitment to Best
Value, public performance reporting (PPR) and continuous improvement.  
5
57

Page 58

3.4. An initial report on the 2022/2023 LGBF results was reported to the Forum, for
noting, on 19 March 2024. As is typical at that point in the reporting schedule,
information was not available at that time on a significant number of LGBF
measures: 28, or 27% of the total. In order to provide members with the fuller
picture that is now available, this update report presents all 2022/2023 LGBF results
that are now available (listed by the service headings as at para 3.1.), highlighting
those results released since the initial report, and setting out commentary and
improvement actions against those indicators.  The steps and actions identified in
the report will not necessarily show immediate improvements - many are long term
plans. 
4. Results and Key Messages
4.1. The report attached as Appendix 1 presents all the LGBF indicators with results
released to date, indicating whether performance in 2022/2023 has improved (↑) or
declined (↓) compared with 2021/2022 results, and if performance is better () or
worse (X) than the Scottish average in 2022/2023. It also includes explanatory
narrative for the movements in performance between 2021/2022 and 2022/2023.
(For your convenience, the updated measures are highlighted, in yellow, in
Appendix 1.) 
4.2. The table below summarises South Lanarkshire Council’s performance: 
Table 1 – Summary of performance of LGBF Results (as at 23/09/24) 
KEY:
Number (%) of indicators
2020-21 2021-22 2022-2023
South Lanarkshire performance   
↑ improving performance in SLC 36 (38%) 39 (39%) 53 (52%)
↓ declining performance in SLC 36 (38%) 53 (54%) 36 (35%)
↔ No change in performance in SLC  2 (2%)   3 (3%)   4 (4%)
--- Results/trends not available  21 (22%)   4 (4%)   9 (9%)
Comparison with Scottish average   
✓ SLC results better than Scottish average 37 (39%) 50 (51%) 51 (50%)
X SLC results worse than Scottish average 37 (39%) 43 (43%) 40 (39%)
↔ SLC results same as Scottish average  0 (0%)   2 (2%)   2 (2%)
--- Results not available  21 (22%)   4 (4%)   9 (9%)
2020-2021 results as at May 2022
2021-2022 updates results as at 29 Nov 2023
2022-2023 results updated as at 23 September 2024 
Note: three new indicators under the Climate change service heading were
recommended for inclusion in the LGBF suite in 2022/2023. 
• Emissions from Transport per Capita
• Emissions from Electricity per Capita
• Emissions from Natural Gas per Capita  
58

Page 59

4.3. Across the 102 indicators in the 2022/2023 suite, South Lanarkshire Council’s
performance improved against 53 (52%) indicators, remained the same against 4
(4%) indicators, and declined for 36 (35%) indicators. There are 9 (9%) indicators
for which the results or trend information is not yet available for 2022/2023,
including the Scottish Household Survey (SHS) satisfaction data and educational
attendance/exclusions. 
4.4. In terms of South Lanarkshire’s figures relative to the Scottish results, performance
was better than the Scottish average for 51 (50%) indicators and was worse than
the average for 40 (39%) indicators. There are 9 (9%) indicators for which the 2022-
2023 results are not yet available. 
5. Publication of the data
5.1. Following this meeting the updated 2022-2023 LGBF results information for South
Lanarkshire Council will be uploaded onto the performance pages on Council’s
website. 
5.2. In addition South Lanarkshire’s LGBF Dashboard will be updated for the results
released since March 2024 and the explanatory narratives provided by Resources. 
6. Employee Implications
6.1. There are no employee implications.
7. Financial Implications
7.1. There are no direct financial implications arising from this report. To further the work
of the Local Government Improvement Service in relation to the LGBF, each
Scottish local authority has committed to make a £2,766 (plus VAT) annual
contribution, set and approved for a three year period, namely 2021/2022 to
2023/2024. This is to be met from within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
9. Other Implications
9.1. There are no risk or other implications associated with the content of this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
10.2. Consultation has taken place with Resources in gathering the information and
explanations included within this report and appendices. 
Paul Manning
Chief Executive 
24 October 2024 
59

Page 60

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Performance and Review Scrutiny Forum Report: LGBF 2022-2023 Results and
Action Plan (19 March 2024) 
List of Background Papers
 LGBF results 2022-2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Tom Little, Head of Communications and Strategy
Extension: 845 4904 (Tel: 01698 454904)
Email: tom.little@southlanarkshire.gov.uk 
60

Page 61

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Children's Services CHN01 Cost per primary school
pupil
£5,963.00 £6,589.00 £6,977.00 £6,863.00 Our cost per primary school pupil has risen in 2022-23 which is
slightly above the Scotland average and in line with the family
group median.  There has been increased expenditure within the
primary sector on staff costs as a result of the national pay
settlement; additional support for council investment in teachers
and classroom support and Children and young people wellbeing
including digital inclusion.
These cost results give no indication of the quality of education
delivered.  SLC's results are linked directly to our position in
ensuring our level of spending on education is supporting the
delivery of a high quality learning experience and environment
for all South Lanarkshire’s pupils at all levels of their education.
CHN02 Cost per secondary
school pupil
£7,538.00 £8,230.00 £8,294.00 £8,482.00 The cost per secondary school pupil in South Lanarkshire has
increased slightly is again in line with the family group median
but is lower than the Scottish Average.  The increase can be
attributed to a number of areas including the continuing
investment in the secondary school estate schools and costs for
our PPP contract commitments; costs associated with teachers’
salaries including pay award as well as council investment in
staffing supporting Children and young people wellbeing and
digital inclusion and continuation of investment in teachers and
classroom support in the secondary sector.
In isolation this measure gives no indication of the quality of the
education delivered. South Lanarkshire’s results are linked
directly to our position in maintaining our level of spending on
education relative to other local authorities during a challenging
economic period.
CHN03 Cost per pre-school
education place
£8,557.00 £10,595.00 £10,589.00 £11,008.00 The cost per pre-school education place in South Lanarkshire
has marginally decreased and is lower than the family group
median and below the Scottish average for a few main reasons:
the reduction in ranking is as a result of the reduced funding
received for 1140 expansion due to population as well as our
efficiency programme to move to a peripatetic model of ELC
teachers across nursery classes and ELC establishments,
5
61

Page 62

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
similar to other authorities.
Actions to improve will include efficient use of resources through
our admission process, maximising pupil to staff ratio whilst
continuing to provide parental choice and funding follows the
child provision.
Comparisons between councils enable an informed debate as to
why variations exist and where best practice exists and lessons
to be learned. Looked at in isolation this measure gives no
indication of the quality of the education delivered.
CHN04 Percentage of pupils
gaining 5+ awards at
level 5
69.0% 71.0% 70.0% 66.0% The slight drop in attainment for this measure compared to
2021/2022 data can be attributed to a return to normal after an
‘alternative certification model (ACM)’ spike. Although data
reduced by 1% point, South Lanarkshire Council improved in
local authority rankings and quartile.
CHN05 Percentage of pupils
gaining 5 or more
awards at level 6
43.0% 41.0% 40.0% 38.0% The slight drop in attainment for this measure compared to
2021/2022 data can be attributed to a return to normal after an
‘alternative certification model (ACM)’ spike. Although data
reduced by 1% point, South Lanarkshire Council improved in
local authority rankings and quartile.
CHN06 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 5
46.0% 52.0% 52.0% 50.0% The continued trend in attainment for this measure compared to
2021/2022 data is very positive given a return to normal after an
‘alternative certification model (ACM)’ spike. South Lanarkshire
Council improved in local authority rankings and quartile.
CHN07 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 6
22.0% 21.0% 25.0% 22.0% The increase in attainment for this measure compared to
2021/2022 data is very positive given a return to normal after an
‘alternative certification model (ACM)’ spike. South Lanarkshire
Council also improved in local authority rankings and quartile.
CHN08a The gross cost of
"Children Looked After"
in residential based
services per child per
week
£3,650.00 £3,860.00 £4,241.50 £4,804.00 Local authorities report their total expenditure on Children and
Families Services within the Local Finance Return 3. Overall
expenditure on Children and Families Services increased, with
South Lanarkshire Council spending around £50.7 million in
2022-23 on these services compared to £44.4 million in 2021-22.
Costs for “Children Looked After” in a residential setting have
62

Page 63

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
increased from £3,869 per child per week in 2021-22 to £4,242
in 2022-23, however, South Lanarkshire Council remains below
the Scottish rate of spend per child at £4,804.
Although South Lanarkshire continue to maintain a good balance
of children being looked after in a community setting (89.5%)
compared to those being looked after in a residential setting
(10.5%), the demand for external residential placements has
increased.  The annual looked after return shows a 9.5%
increase in the number of children looked after in residential
placements when comparing the 31 July 2022 position to 2023.
The Council has secured Big Lottery funding of £0.132m through
Barnardo’s for 2024/25 and 2025/26. This will allow the provision
of housing support, whereby young people leaving care are
supported by Barnardo’s to manage their tenancy and develop
life skills. The funding secured from Big Lottery will cover the
costs for this, with 4 young people, with the most complex needs,
who are currently in continuing care placements to be initially
piloted.
CHN08b The gross cost of
"Children Looked After"
in a community setting
per child per week
£277.50 £307.00 £340.96 £422.00 Local authorities report their total expenditure on Children and
Families Services within the Local Finance Return 3. Overall
expenditure on Children and Families Services increased, with
South Lanarkshire Council spending around £50.7 million in
2022-23 on these services compared to £44.4 million in 2021-22.
Costs for “Children Looked After” in a community setting have
increased from £305 per child per week in 2021-22 to £341 in
2022-23, however, South Lanarkshire Council has maintained a
position of lower costs than the Family Group and Scottish
average, ranking 8th.
This reflects South Lanarkshire’s commitment to shift the way
care is delivered to Looked After Children, with continued support
to children and young people within the community. South
Lanarkshire continue to maintain a good balance of children
being looked after in a community setting (89.5%) compared to
63

Page 64

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
those being looked after in a residential setting (10.5%).
CHN09 Percentage of children
being looked after in the
community
90.43% 90.40% 89.50% 89.20% South Lanarkshire Council’s position remains above the Scottish
average and ranking has improved from 12 to 11, despite a slight
decrease of 0.09% in our performance. A draft tender for an
Intensive Family Support Service has been scoped at circa
£1.2m over a three-year period for a provider to work with
identified children in residential care, the aim is to return these
young people to their family home or alternative options in the
community. This reflects South Lanarkshire’s commitment to shift
the way care is delivered to Looked After Children from a
residential-based to a community–based model.
CHN10 Percentage of Adults
satisfied with local
schools
75.80% 74.70% 72.00% 73.70% This data is from the Scottish Household Survey which is a
community based opinion survey.
CHN11 Percentage of pupils
entering positive
destinations
96.2% 96.2% 96.9% 95.9% South Lanarkshire’s positive destination rate is 96.9%, which is a
0.7% improvement from 2021/22 (96.2%) and reflects the
destinations of 3650 school leavers. SLC’s rate is above the
national rate (95.9%) and is the sixth highest of the 32 LA’s.
1.5% of leavers were classified as unemployed (seeking) a 0.8%
improvement from the previous year. 0.4% of young people were
in an unknown destination.
CHN12a Overall Average Total
Tariff
1,009 1,007 987 915 The tariff score is used by individual schools to assess the
progress of learners in SCQF qualifications.  The overall tariff
level in South Lanarkshire in 2021-22 is above the National level
and in line with the Family Median. Qualifications are awarded
tariff points based on their Scottish Credit and Qualification
Framework (SCQF) level. Average tariff scores are calculated
from the latest and best achievement of pupils during the senior
phase (S4-S6) across a range of awards included in a national
benchmarking tool. This offers a wider measure of achievement
to consider alongside the narrower LGBF attainment measures
(CHN 4 to CHN7). This measure can be influenced by curricular
models and the selection of more appropriate routes to positive
destinations for young people.
CHN13a % of P1, 4, 7 pupils
combined achieving
70.0% 71.0% 73.5% 72.7% In 2022/23, 73.5% of pupils in South Lanarkshire achieved the
appropriate attainment level.  The performance has improved by
64

Page 65

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
expected Curriculum for
Excellence Level in
Literacy
2.2% points between 2021/22 and 2022/23.
CHN13b % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
Numeracy
78.0% 79.0% 81.6% 79.6% In 2022/23, 81.6% of pupils in South Lanarkshire achieved the
appropriate attainment level.  The performance has improved by
2.5% points between 2021/22 and 2022/23.
CHN14a Literacy attainment gap
P1,4,7 combined - %
point gap between the
least deprived and most
deprived pupils
24.00% 24.40% 22.30% 20.50% In 2022/23 the primary literacy "Closing the Gap" is 22.3%
points.  This means the Closing the Gap data has improved by
2.1% points between 2021/22 & 2022/23.  Closing the Gap and
raising attainment remains a key priority.
CHN14b Numeracy attainment
gap P1,4,7 combined -
% point gap between
the least deprived and
most deprived pupils
19.00% 18.60% 17.70% 17.00% In 2022/23 the primary numeracy "Closing the Gap" is 17.7%
points.  This means the Closing the Gap data has improved by
1.1% points between 2021/22 & 2022/23.  Closing the Gap and
raising attainment remains a key priority.
CHN17 % of children meeting
developmental
milestones
82.29% 80.80% 81.90% 82.10% The percentage of children meeting developmental milestones
increased from 80.8% 2021-22 to 81.98% in 2022-23, despite
this however South Lanarkshire remain below the Scottish
Average of 82.1 %. However, this measure looks to compare the
percentage of children with 'no concerns' recorded, and the
percentage with 'no concerns' recorded but with some domains
incomplete or missing. In South Lanarkshire, 95% of children
reviewed had meaningful data recorded in all domains compared
to Scottish average position of 91%.
CHN18 % of funded early years
provision which is
graded good/better
89.68% 88.55% 85.70% 90.10% Early Years establishments and school nursery classes are
inspected both by Education Scotland around the quality of
educational provision using Quality Indicators and separately by
the Care Inspectorate.
The results for 2022-23 show a slight decline in percentage
terms compared with the previous year.
CHN19a School attendance rate 91.60% ------ 90.00% 90.20% The school attendance rate fell in 2022/23 in South Lanarkshire
as schools continued to recover from the impact of Covid-19.
Attendance in South Lanarkshire is in line with both the national
65

Page 66

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
level and the Family Group median. Data is collected every 2
years - the next set of results will be available in 2024/25.
CHN19b School attendance rate -
looked after children
86.01% ------ ------ ------ Data not yet available - published every 2 years
CHN20a School exclusion rates
(per 1,000 pupils)
12.57 ------ 18.10 16.60 The school exclusion rate per 1000 pupils for session 20/21 was
affected by the continued Covid pandemic and lockdowns by
reducing the number of openings for overall attendance of the
pupil population and therefore reducing the number of openings
for school exclusions. The exclusion rate has risen for session
22/23. However reducing exclusions, particularly among care
experienced children, remains a priority for this Council and our
own statistics show that for session 23/24 there has been a
significant reduction in exclusions for this priority group.
CHN20b School exclusion rates
(per 1,000 looked after
children)
81.57 ------ ------ ------ Data not yet available - published every 2 years
CHN21 Participation rate for
16-19 year olds
92.79% 92.31% 95.00% 94.30% South Lanarkshire's performance increased to 95% which is
0-7% above the National Average and the Family Group.  A
partnership plan to increase the participation rate was
developed. The action plan included detailed local tracking
arrangements including door knocking to establish destinations
and offering support where required. These actions have been in
place since June 2022 – and has had a positive impact on the
2022-23 LGBF result.
A young person is deemed to be participating when they are
actively engaged with an organisation for the purpose of
learning, training or work – work includes volunteering. This
annual participation measure reports on the activity of the wider
16-19 year old cohort, including those at school.
CHN22 % of child protection
re-registrations within 18
months
6.47% 5.80% 8.50% 5.60% The position has moved here from 5.8% in 2021-22, to 8.5% in
2022-23, with South Lanarkshire having a higher percentage of
child protection re-registrations within 18 months than the
Scottish average of 5.6%.
Re-registrations up to 24 months since last de-registration are
66

Page 67

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
monitored quarterly within the Child Protection Committee
quarterly report, as per the Scottish Government minimum
dataset, and the Data and Quality Assurance Sub-group
undertake audit activity on re-registration cases.  The local CPC
dataset shows that number of re-registrations up to 24 months
from 2021-22 to 2022-23 are fairly consistent, however, the
numbers of children re-registered within 6 months has actually
improved in 2022-23, therefore whilst the national indicator
demonstrates an overall increase in the number of
re-registrations up to 18 months, local analysis suggests
re-registrations are happening later than in previous years which
would indicate children are not being deregistered prematurely.
CHN23 % Looked After Children
(LAC) with more than 1
placement in the last
year (Aug-July)
13.96% 15.60% 13.90% 17.20% In South Lanarkshire, the number of children who have had more
than one placement in the last year has improved from 15.6% in
2021-22 to 13.9% in 2022-23. South Lanarkshire are performing
better than the Scottish average position of 17.2% and ranking
has improved from 13 to 10. South Lanarkshire strive to be the
best corporate parents they can be for those children and young
people whose needs are best served by being in care.
Placement stability and consideration of the most effective
means of securing long term stability for a child is at the forefront
of our decision making.
CHN24 Percentage of children
living in poverty (After
Housing Costs)
19.6% 22.8% 23.6% 21.8% In 2022/23 South Lanarkshire has a higher percentage of
children living in poverty (after housing costs) compared to the
Scottish average. The family group average for this indicator is
25.8% and South Lanarkshire has the lowest percentage within
the family group.
A Child Poverty Commitment document has been published that
outlines the reach of work to mitigate child poverty across South
Lanarkshire’s key strategies and workstreams. This approach is
underpinned by a suite of indicators that are tracked on an
annual basis to determine impact of the work.
•Percentage of children (0-15) living in relative poverty
(after housing costs)
•Percentage of children in low-income families (before
67

Page 68

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
housing costs)
•Percentage of households with children not managing
well financially (over the previous 12 months)
•Percentage of children living in families that are unable
to afford the bare necessities
•Percentage of fuel poor households
An outcome focussed action plan is in place and managed by
child poverty partners which helps to monitor both the range of
activity and outcomes achieved. The reporting of activity
contained within the plan forms the basis for the annual Local
Child Poverty Action Report. The next iteration of the report is
due September 2024.
Climate Change CLIM01 CO2 Emissions area
wide per Capita
4.13 4.54 ------ ------ Data not yet available
CLIM02 CO2 Emissions area
wide: emissions within
scope of Local Authority
(LA) per Capita
3.34 3.73 ------ ------ Data not yet available
CLIM03 Emissions from
Transport per Capita
(New)
20.55 18.82 23.69 27.67 This indicator records the annual carbon dioxide emissions from
Transport per 1,000 population (in tonnes) with the local authority
area. The 2022/23 data shows an increase in transport
emissions from the previous year.  This can be attributed to the
rebound in the amount of travel following the travel restrictions of
the Covid pandemic. The figure for South Lanarkshire has fallen
by 12.5% since the baseline year of 2017/18 and is below the
Scottish average of 27.67 tonnes.
CLIM04 Emissions from
Electricity per Capita
(New)
45.55 43.78 39.70 43.46 This indicator records the annual carbon dioxide emissions from
Electricity per 1,000 population (in tonnes) with the local authority
area. Emissions from electricity have fallen significantly in recent
years largely due to the decarbonisation of the grid. The figure
for South Lanarkshire has fallen by 52.1% since the baseline
year of 2017/18 and is below the Scottish average of 43.46
tonnes.
CLIM05 Emissions from Natural
Gas per Capita (New)
75.31 74.14 74.59 57.23 This indicator records the annual carbon dioxide emissions from
Natural Gas per 1,000 population (in tonnes) with the local
68

Page 69

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
authority area. Emissions from gas have fallen in recent years
largely due to the decarbonisation of the gas network. The figure
for South Lanarkshire has fallen by 2.8% since the baseline year
of 2017/18 but is above the Scottish average of 57.23 tonnes.
The higher figures for South Lanarkshire can be attributed to
some large industrial gas users being located within the area and
a high percentage of housing being located on the gas grid.
Corporate Asset CORP
-ASSET1
Percentage operational
buildings that are
suitable for their current
use
96.41% 94.73% 95.30% 86.10% Continued implementation of the Council’s asset management
strategy and plans has resulted in a clear focus in optimising
Council buildings to ensure they are suitable.
The table indicates 95.3% of properties support delivery of
services in terms of suitability, a slight increase from 94.7% in
2022 and reflects the changing nature of the Council’s service
requirements.
CORP
-ASSET2
Percentage internal floor
area of operational
buildings in satisfactory
condition
87.78% 88.12% 88.90% 89.70% Despite the current financial climate and reduced funding to
Scottish Local Authorities, the figures show that, through
programmes of Prioritised Capital Investment, Schools Lifecycle
Investment and Planned Preventative Maintenance, performance
remains positive for the majority of categories of property.  The
limitations placed on budgets will provide challenges to
sustained performance going forward.  We will continue to
challenge the requirement for our assets, retaining only those
that support our strategic objectives, in order to establish a core
estate.
Corporate Services CORP01 Support services as a
percentage of total
gross expenditure
3.59% 3.87% 3.80% 4.00% There has been a small decrease in the cost of support as a
percentage of total budget – this is a combination of an increase
in support costs and also an increase in the total budget.  These
result in an overall minor decrease in the percentage.
CORP03
b
The percentage of the
highest paid 5%
employees who are
women
55.27% 56.71% 59.60% 58.90% There has been an increase in the proportion of women in the
top 5% earners in the Council between 2021-22 and 2022 -23.
We continue to work in line with our current policies and
processes to ensure that our female employees at that top end
(which can shift depending on where the 5% falls), are being
progressed appropriately. Our picture is improving year on year
and we need to keep a focus on that along with the work that we
continue to do in line with our equalities duties.
69

Page 70

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
CORP03
c
The gender pay gap 4.83% 4.00% 3.20% 2.50% We continue to monitor pay and grading to ensure appropriate
action to address any inconsistencies. This includes job
evaluation exercises which have resulted in improved rates of
pay.
Actions We will continue to monitor gender and pay gap
information and take action as required. We continue to plan and
implement actions in partnership with trades union
representatives in line with the principles of ‘Delivering a fairer
future'.
CORP04 The cost per dwelling of
collecting Council Tax
£6.63 £7.35 £6.38 £6.84 The cost of collecting council tax per dwelling in 2022-23 has
decreased compared to 2021-22 due to an increase in income
from cases progressing to summary warrant.
The cost of collecting council tax will continue to be managed
closely through regular monitoring and reporting of expenditure
in this area.
CORP06
a
Sickness absence days
per teacher
5.12 7.24 7.40 6.80 The number of days lost due to sickness has increased
compared to 2021-22, due to an increase in the number of
short-term absences.  For Q1 and Q2 the absence rate was the
same or lower than the previous year, however there was an
increase in the third quarter, which impacted the overall figure for
the year. This was attributed to an increase in short term
absence during this quarter.
Actions: The HR team continue to monitor absences and have
had a focus on short term absence. Specific service areas were
reminded of the actions required to reduce short term absences
through targeted sessions and training.
CORP06
b
Sickness absence days
per employee (non
teacher)
10.11 12.98 13.90 13.20 The number of days lost due to sickness has increased
compared to 2021-22, due to an increase in the number of
short-term absences.  For Q1 and Q2 the absence rate was the
same or lower than the previous year, however there was an
increase in the third quarter, which impacted the overall figure for
the year. This was attributed to an increase in short term
absence during this quarter.
Actions: The HR team continue to monitor absences and have
70

Page 71

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
had a focus on short term absence. Specific service areas were
reminded of the actions required to reduce short term absences
through targeted sessions and training.
CORP07 Percentage of income
due from Council Tax
received by the end of
the year
95.55% 96.19% 97.00% 96.20% The improved collection rate is largely due to the cost of living
payment of £150 applied to council tax accounts for low income
households in 2022-23.
South Lanarkshire’s performance continues to be better than the
Scottish average. Work to maximise council tax income
collection will continue in 2023-24, utilising all available recovery
methods.
CORP08 Percentage of invoices
sampled that were paid
within 30 days
90.70% 92.94% 91.80% 90.60% Although South Lanarkshire's performance fell slightly in 2022-23
compared with the previous year, the result continues to be
better than the Scottish average.  Finance staff proactively
discuss issues with Resources on a regular basis and work
together to improve performance.
CORP09 % of Crisis Grant
decisions within 1 day
97.75% 99.00% 97.80% 91.80% Crisis Grant application volumes continue to match the
unprecedented levels experienced during the Covid pandemic
with the council continuing to ensure processing timescales
remained within target levels. Although the percentage of
decisions made within target was slightly down compared to
2021-22, at 97.8% it was still well above the national benchmark.
Actions:  The timescales for processing Crisis Grants will
continue to be monitored closely through regular reporting,
ensuring adequate resources are allocated to process these
applications.
CORP10 % of Community Care
Grant (CCG) Grant
Decisions within 15
days
98.25% 97.50% 97.80% 87.30% Although Crisis Grants applications continue to be received at
unprecedented levels and are prioritised for processing given the
emergency need for financial assistance, the percentage of
Community Care Grants decisions made within 15 days
remained exceptionally high at 97.8% and slightly above 2021-22
performance.
Actions:  The timescales for processing Community Care Grants
will continue to be monitored closely through regular reporting,
ensuring adequate resources are allocated to process these
applications.
CORP11 The percentage of 110.08% 181.57% 164.80% 130.00% The increased proportion of SWF expenditure in 2022-23 when
71

Page 72

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Scottish Welfare Fund
(SWF) Budget Spent
compared to the Scottish Government SWF funding allocation is
due to additional discretionary funding allocated by the Council
to the SWF from the Local Authority Covid Economic Recovery
(LACER) fund. This supplemented the initial SWF budget
allocation received from Scottish Government in 2022-23.
Actions:  The administration of the SWF will continue to be
monitored closely and reported on a regular basis to ensure
effective financial management of the fund.
CORP12 The percentage of
Discretionary Housing
Payments (DHP)
Funding Spend
108.18% 101.94% 104.80% 94.40% South Lanarkshire continues to spend the budget it receives with
performance well above the Scottish average.
Actions:  The administration of DHP funding will continue to be
monitored closely and reported on a regular basis to ensure
effective financial management of the fund.
Culture & Leisure
Services
C&L01 Cost per attendance at
sports facilities
£54.05 £6.30 £4.50 £4.89 The cost of attendance has dropped by £1.80 to £4.50 which is
below the Scottish average (£4.89).  Although still within the third
quartile we have moved up one place in the ranking from 18 to
17.  More importantly, attendances have increased by 65% on
2021/22.
As we work to develop new ways of delivering services and
adapt in these challenging times, we anticipate a slower but
continued growth. As part of an Asset Review which is currently
underway some services may be streamlined which will help
keep costs low yet minimise any impact on customers.
C&L02 Cost per library visit £6.09 £5.07 £3.62 £2.81 There has been a drop of £1.40 in the cost per library visit,
although this remains above the Scottish average and no change
to our ranking or quartile.
However, library attendances have increased by 49% on the
previous year, with virtual attendances now overtaking physical
attendance figures, this trend is expected to continue in 2023/24.
As part of an Asset Review which is currently underway some
services may be streamlined which will help reduce costs further
and with the shift to a higher proportion of virtual customers any
impact should be minimal.
C&L03 Cost of museums per £13.49 £3.75 £2.47 £3.07 At £2.47 per visit, we are 60pence lower than the Scottish
72

Page 73

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
visit average and this puts us in the second quartile, rising in rank
from 10 to 9.
Attendances have improved by over 44% on 2021/22 and have
exceeded (pre-covid) 2019/20 attendances by 11%.  There is a
change in customer behaviour with more virtual visitors
accessing services online and we anticipate this, and overall
attendances, will continue to grow.
C&L04 Cost of parks and open
spaces per 1,000
population
£32,076 £31,458 £31,063 £23,311 The cost of parks and open spaces per 1,000 population in
2022/23 was £31,063. This is an improvement (reduction) from
the previous year (£31,458) but remains higher than the Scottish
average of £23,311.
SLC work to a high output specification on all council land and all
maintenance operations including, general open spaces, parks,
sports areas, golf courses, bowling greens, care of gardens,
back courts and cemeteries, and of which are included within the
overall net controllable expenditure.
SLC operate with a large fleet of both cut and collect and cut and
drop ride-on mowers as well as a large fleet of tractors with
batwing mowers to ensure our grass is maintained: in excess of
10 million m2 is cut on 14-18 occasions throughout the summer
season.
We maintain 6 golf courses which are high maintenance areas
requiring specialist skills and machinery to ensure they are of the
highest possible standard. Likewise, we have a number of high
maintenance bowling greens.
We maintain 3000 residents’ gardens on behalf of Housing
service via the care of gardens service.
We have 55 cemeteries spread throughout South Lanarkshire
that are maintained to the highest standard - we appreciate what
they represent to the local community.
Notably, South Lanarkshire was shortlisted as an APSE Finalist
for Parks and Grounds as best and most improved performer in
73

Page 74

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
2022.
C&L05a Percentage of adults
satisfied with libraries
69.23% 67.30% 66.30% 71.00% SLC has dropped 1% on our 21/22 satisfaction rates and 4.7%
below the Scottish average, however when taken in the context
of the ‘family grouping’ SLC sits 1.8% above the average for
library services.  It should also be noted that the household
survey does not necessarily mean those completing the survey
have used our services.  SLLC conducted a Customer
Satisfaction Survey in 22/23 to assess actual service delivery,
nearly 3,000 customers responded (12% of members across
services), with very positive feedback saying - service delivery
95%, staff performance 97% and value for money 95%.
C&L05b Percentage of adults
satisfied with parks and
open spaces
79.43% 83.00% 86.70% 87.30% Although the percentage is slightly below the Scottish average,
within South Lanarkshire satisfaction has improved from 83% in
2021-22 to 86.7% in 2022-23, this also resulted in an
improvement in our ranking from 24 to 19.
C&L05c Percentage of adults
satisfied with museums
and galleries
64.70% 65.70% 66.30% 71.30% SLC saw an improvement of 0.6% in 2021/22 satisfaction rates
although we remain 5% below the Scottish average. When taken
in the context of the ‘family grouping’ SLC sits 7.4% above the
average for museum services.  It should also be noted that the
household survey does not necessarily mean those completing
the survey have used our services.  SLLC conducted a Customer
Satisfaction Survey in 2022/23 to assess actual service delivery,
nearly 3,000 customers responded (12% of members across
services), with very positive feedback saying - service delivery
95%, staff performance 97% and value for money 95%.
C&L05d Percentage of adults
satisfied with leisure
facilities
68.27% 68.00% 69.70% 71.00% SLC saw an improvement of 1.7% on 2021/22 satisfaction rates
although we remain 1.3% below the Scottish average, however
when taken in the context of the ‘family grouping’ SLC sits 7.4%
above the average for sport and leisure services.  It should also
be noted that the household survey does not necessarily mean
those completing the survey have used our services.  SLLC
conducted a Customer Satisfaction Survey in 2022/23 to assess
actual service delivery, nearly 3,000 customers responded (12%
of members across services), with very positive feedback saying
- service delivery 95%, staff performance 97% and value for
money 95%.
74

Page 75

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Economic Development ECON01 Percentage of
unemployed people
assisted into work from
council funded/operated
employability
programmes
5.54% 22.04% 12.90% 12.90% The percentage of unemployed people supported into
employment by SLC employability programmes has reduced
from 22% in 21/22 to 12.9%. This reflects the more buoyant
labour market which has enabled higher numbers of unemployed
people to find work without support. The figures also reduced
due to the ending of the Kickstart and LTU programmes which
directly recruited unemployed people into work in 21/22.
ECON02 Cost of planning and
building services per
application
£4,334.00 £4,695.00 £5,410.00 £5,538.00 The overall cost of Planning and Building Standards per
application increased from £4,695 in 2021/22 to £5,410 in
2022/23 which is below (better than) the Scottish average
(£5,538).  Total income across the service fell from £4.01m to
£3.49m.  The period saw a small drop in the number of
applications received and significant turnover in staff which
meant the service was not fully resourced at any point during
2022/23. Nevertheless, South Lanarkshire’s service costs in this
area remain better than the Scottish average.
ECON03 Average time per
business and industry
planning application
(weeks)
16.75 Wks 20.59 Wks 22.90 Wks 12.00 Wks The average time for processing business/industrial planning
applications in South Lanarkshire increased from 20.59 weeks in
2021/22 to 22.9 weeks in 2022/23.  This remains higher (worse
than) the Scottish average of 12.0 weeks.
Through 2022/23 a number of “legacy” applications were decided
which impaired the overall processing times.  Clearing this
backlog of applications, which were effectively on hold as further
information was being sought from applicants, should result in
improved performance against this indicator in the future.
Additional resources have also been brought into the Planning
Service which will positively impact on the processing of planning
applications.
ECON04 Percentage of
procurement spend on
local enterprises
17.0% 18.2% 18.1% 29.6% Percentage of spend on local enterprises increased from 17% in
2020/21 to 18.2% in 2021/22 and has broadly maintained that
improved level through 2022/23 at 18.1%.  It does however
remain significantly lower than the Scottish average of 29.6%.
Construction is an area of high spend where opportunities to
improve local spend has been sought. The impact of high
inflation in the construction sector and the challenges across the
75

Page 76

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
public sector on delivering large scale construction projects has
reduced some opportunity at a local level.
The perceived complexity of public sector procurement and the
required investment in completing tender submissions is
deterring some small businesses that might lack sufficient
administrative resources. There are a greater proportion of
smaller enterprises in South Lanarkshire which increases the
challenge in increasing and improving this measure.
Supplier engagement and promotion of the free to access
support, continues to encourage participation in tendering
exercises.
ECON05 No of business gateway
start-ups per 10,000
population
8.95 15.71 16.20 14.30 The number of business gateway start-ups per 10,000 population
has continued to grow from 8.95 in 2020/21 to 15.71 in 2021/22
and 16.20 in 2022/23. This remains higher (better than) the
Scottish average of 14.3.
Economic Development continue to work with the Lanarkshire
Business Gateway to increase business start-up and
sustainability. The revised Business gateway management
arrangements from March 2024 should further enhance delivery
and efficiency for businesses.
ECON06 Investment in Economic
development and
Tourism per 1,000
population
£44,293 £74,111 £70,043 £109,349 Investment in Economic Development and Tourism per 1,000
population in South Lanarkshire stabilised in 2022/23 at £70,043.
This level of spend is less than the Scottish Average of
£109,349. Less expenditure in these services however is not
necessarily an indicator of efficiency or value for money, since
some authorities as
a result of council policy decisions, choose to invest more
resources into Economic Development and Tourism.
It has been a particularly challenging period for the sector as
difficulties around staff recruitment and retention have
disproportionately impacted the industry.
ECON07 Percentage of people 20.80% 12.50% 10.00% 9.40% The figures that correspond to the year for reporting (Office for
76

Page 77

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
earning less than the
living wage
National Statistics, Annual Survey of Hours and Earnings 2022)
indicates that 10% of employees in South Lanarkshire currently
earn less than the living wage. The percentage of employees
earning less than the living wage in South Lanarkshire (10%)
continues to run above the Scottish average (9.4%), the
benchmark for this measure. The Community Planning
Partnership Living Wage group continues to promote the Living
Wage across South Lanarkshire.  For example, events and
communications promoting the Living Wage including
participating in the Living Wage week; supporting 15 local
employers with their accreditation fees; and celebrating the
100th employer who started paying the Living Wage.
ECON08 Percentage of
properties receiving
superfast broadband
96.20% 97.00% 97.60% 95.50% In 2022/23, 97.60% of properties in South Lanarkshire had
access to high-speed broadband and speeds greater than 30
Mbps. This figure continues to rise slowly and remains above the
Scottish average of 95.50%.
The majority of the 2.40% of properties not yet able to access
high speed broadband are located within rural areas. These
properties are either included within the Scottish Governments
R100 investment Programme and projected to receive full fiber
connection by 2026 or are too difficult or expensive to connect to
an existing network and are then eligible for Scottish Broadband
Voucher Scheme to help find alternative solutions.
ECON09 Town vacancy rates 8.80 9.85 14.00 12.00 There has been an increase in town centre vacancy rates and
this is due to the high levels of vacancies in Hamilton and East
Kilbride Shopping Centers as a result of the challenges that they
are facing. However, overall vacancy rates have held up well
under the recent pressures.
Work being done through the East Kilbride and Hamilton
masterplans are expected to improve vacancy rates over the life
of the masterplans.
ECON10 Immediately available
employment land as a
% total land allocated
37.47% 12.73% 12.10% 22.80% This figure has reduced slightly against the 2021-22 figure and is
significantly lower than the Scottish average, however work is
being undertaken to identify and increase the available
77

Page 78

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
for employment
purposes in the local
development plan
employment land.
ECON11 Gross Value Added
(GVA) per capita
£18,821 £19,400 £20,624 £27,039 The performance for South Lanarkshire shows a modest
improvement when compared with the rest of Scotland. This is a
positive outcome particularly in light of the challenges faced
across a number of our key sectors which faced acute economic
challenges at the time. As examples the construction industry
was facing unprecedented construction inflation and both the
food and drink sector faced challenges recruiting and retaining
staff as the impacts of Brexit. This combined with the decline of
the key retail areas in our town centres means that the slight
improvement in performance shows the strength of other aspects
in the economy and the resilience of our business base.
ECON12
a
Claimant Count as % of
Working Age Population
6.3% 4.7% 3.2% 3.2% The SLC clamant count as a percentage of the population has
fallen to 3.2 % from 4.7% the previous year. This is the same as
the national figure and reflects the tighter employment market
during 2022/23 with an increased availability of vacancies as the
economy recovered after covid.
ECON12
b
Claimant Count as % of
16-24 Population
7.83% 5.30% 3.50% 3.60% The claimant count for 16-24 year olds is 3.5% which is lower
than the Scottish rate and lower (better) than the result in
2021/22
Environmental Services ENV01a Net cost of waste
collection per premise
£81.97 £86.51 £83.52 £79.20 The net cost of waste collection per premises in South
Lanarkshire reduced to £83.52 in 2022/23. This is slightly
higher(worse) than the Scottish average of £79.20 but it is an
improvement on the previous year, when the figure was £86.51.
The overall ranking position has also improved to 21st from 25th
in 2021/22.
The higher costs reflect the Council’s continued position to
provide a range of services free of charge to residents. Unlike
the majority of councils in Scotland, South Lanarkshire offers
each household a free bulk uplift each year. The Council also
does not charge for garden waste bin collections. Chargeable
garden waste uplifts are becoming increasingly more common in
Scotland and allow councils who implement a charge to offset
78

Page 79

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
collection costs. The Council also provides free compostable
bags to residents whilst the majority of councils do not.
ENV02a Net cost of waste
disposal per premise
£113.48 £113.57 £100.65 £99.76 The net cost of waste disposal per premises in South
Lanarkshire reduced to £100.65 in 2022-23.  This is an
improvement on the previous two years. The overall ranking
position also improved from 20th in 2021/22 to 15th in 2022/23.
The net cost of waste disposal per premise is slightly higher than
the Scottish average of £99.76 but this reflects the fact that the
Council does not send non-recyclable waste to landfill. Costs to
thermally treat non-recyclable waste are higher than sending the
material to landfill.  It does mean though, that the Council has a
higher landfill diversion rate than local authorities that are still in
the process of procuring a solution to the forthcoming ban on the
landfilling of biodegradable municipal waste.
ENV03a Net cost of street
cleaning per 1,000
population
£16,020.00 £17,640.00 £19,632.00 £16,068.00 The costs associated with our street cleaning operations
increased to £19,632 in 2022/23. The figure is above the Scottish
average of £16,068, and South Lanarkshire ranks in 28th place
out of all the local authorities.
The higher costs associated with our street cleaning operation
are attributed to the high levels of services that we provide:
graffiti removal, street cleaning including shifts, fly tipping uplift,
fly posting removal, blood spills, hypodermic needle uplift, dead
animal uplift and both the large and smaller mechanical
sweeping fleet that we utilize. This equipment performs an
essential and legislatively required service including the removal
of detritus from roads/channels, (COPLAR)
Since the Litter Strategy was approved in 2022, work has been
ongoing with regards to making changes to reduce the impacts
and costs associated with fly tipping and general littering. A new
litter action steering group which includes service reps across
the Council have been working on a litter action plan to tackle
these issues. This will hopefully have an environmental impact
and a subsequent decrease in spend across the area.
79

Page 80

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ENV03c Street cleanliness score 94.05% 92.10% 92.30% 90.60% South Lanarkshire Council continues to score higher for its street
cleansing service than the Scottish average (90.6%), with
92.30% of streets surveyed found to be of an acceptable
standard. This is a slight increase from 92.10% in 2021/22.
South Lanarkshire Council also scored slightly higher than the
Club 3 (local authority benchmarking club) average which is
92.20%.
ENV04a Cost of roads per
kilometre
£20,056.00 £19,295.00 £16,828.00 £12,844.00 Spend per kilometre of road has decreased compared to the
previous year (from £19,295 in 2021/22 to £16,828 in 2022/23).
This is partly due to less funding being allocated to carriageway
resurfacing as we look to balance any available funding across
all our key asset groups. The spending figure also varies year
upon year dependent on the level of City Deal project spend.
In 2022/23, South Lanarkshire has moved from the 7th to the
11th highest investing local authority per kilometre of road. The
level of spend in South Lanarkshire remains higher than the
Scottish average, reflecting the council’s decision to continue to
invest in our road network. It should be noted that the industry is
currently encountering significant construction inflation and as a
result projects are costing much more than before, and the
equivalent scale of works are not presently possible with the
same level of investment.
ENV04b Percentage of A class
roads that should be
considered for
maintenance treatment
23.90% 23.99% 23.90% 27.40% There has been a marginal improvement in the condition of A
Class roads in South Lanarkshire although the condition trend
could be described as static. Due to continued high levels of
construction inflation projects are costing much more than
before, and the equivalent scale of works are not presently
possible with the same level of investment. Positively however,
the condition of the A Class network in South Lanarkshire
remains better than the Scottish average.
ENV04c Percentage of B class
roads that should be
considered for
maintenance treatment
26.20% 25.62% 26.10% 31.50% There has been slight regression in the condition of B class
roads in South Lanarkshire however their condition remains a
substantial 5.4% better than the Scottish average.
80

Page 81

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ENV04d Percentage of C class
roads that should be
considered for
maintenance treatment
37.60% 34.91% 35.60% 32.70% There has been regression in the condition of C class roads in
South Lanarkshire and their condition falls below that of the
Scottish average.
ENV04e Percentage of U
(unclassified) roads that
should be considered
for maintenance
treatment
30.50% 29.91% 31.60% 36.40% Unclassified roads make up a sizeable proportion of the road
network in South Lanarkshire. In 2022-23 we have noted a
regression in their condition however this remains 4.8% better
than the Scottish average.
ENV05a Cost of Trading
Standards, Money
Advice & Citizen Advice
per 1,000 population
£2,911.00 £3,464.00 £2,970.00 £7,060.00 The cost of Trading Standards per 1,000 population in 2022/23
reduced from the 2021/22 level due to difficulties in recruiting
Officers. Vacancies were filled in 2023 and it is anticipated costs
will return to the level seen in 2021/22 when 2023/24 figures are
available. However, South Lanarkshire service costs are still
expected to remain well below the Scottish average.
Despite costs being below the Scottish average, the service
provides a good level of protection for local consumers.
ENV05b Cost of environmental
health per 1,000
population
£12,549.00 £13,280.00 £12,404.00 £15,239.00 The cost of environmental health per 1,000 population
decreased slightly in 2022/23, compared to the previous year,
due to vacancies and continues to remain well below the Scottish
average.
Costs are expected to return to previous levels following
recruitment during 2023. Despite costs being below the Scottish
average, the service provides a good level of public health
protection for local communities.
ENV06 The percentage of total
household waste arising
that is recycled
40.48% 40.40% 41.00% 43.30% The percentage of total household waste that is recycled
increased (improved) slightly in 2022/23 compared to the
previous year but at 41% it is still below the Scottish average of
43.3%.  Multi--occupancy properties (flatted developments) make
up over 30% of housing stock in South Lanarkshire. The lack of
space at these properties means opportunities to provide
recycling services are limited. Moreover, when recycling bins are
provided often the only option is to provide large communal bins,
where contamination rates are significantly higher than in
81

Page 82

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
individual wheeled bins. This has a major impact on the amount
of good quality recyclable material collected which negatively
affects the Council’s household recycling rate.
It is also worth noting that, unlike a number of other councils,
South Lanarkshire Council still accepts ‘black bag waste’ in bulk
uplifts. This disincentivises residents from sorting their household
waste and has a further a detrimental impact on recycling rates.
ENV07a Percentage of adults
satisfied with refuse
collection
81.50% 84.30% 85.30% 78.00% The percentage of adults satisfied with refuse collection is taken
from the Scottish Household Survey. The figure of 85.3% is
higher than the Scottish average of 78% and an improvement on
the previous year. It places South Lanarkshire in the second
quartile for performance.
ENV07b Percentage of adults
satisfied with street
cleaning
60.33% 61.70% 61.70% 58.30% Satisfaction rate has remained steady at 61.7%, however the
ranking has improved to 16 (from 17) and is higher than the
Scottish average.
Results from the consultation during the development of the
Litter Strategy gave a positive picture of the satisfaction with the
Strategy and this is encouraging for moving forward with our
future plans and initiatives.
Financial Sustainability FINSUS0
1
Total useable reserves
as a % of council annual
budgeted revenue
18.33% 14.74% 20.87% 24.50% The council has seen an increase in useable reserves as a
percentage of Council budget.  This reflects an increase in the
level of useable reserves (significantly as a result of the new
accounting arrangements for Service Concessions) and an
increase in the council’s annual expenditure Budget, meaning
that arithmetically, the percentage of useable reserves to annual
budget increases.
The important factor to consider is the purpose and use of
reserves, and the fact is that the council is clear on what
reserves we have, and the purpose of them. The use of Loans
Fund Review and Service Concession Reserves will affect the
figures for the next few years as they are used to support the
Council's financial strategy.  The key factor is that the reserves
are sufficient.
FINSUS0 Uncommitted General 1.64% 1.50% 1.45% 3.20% The value of the Council’s Uncommitted General Fund balance
82

Page 83

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
2 Fund Balance as a % of
council annual budgeted
net revenue
has not changed from 2019/20.  The Council's budget has
increased therefore resulting in a minor decrease in the
percentage.
This is very much an arithmetic impact.  Our uncommitted
balance has not changed, but the budget does change due to
external factors including government grant ringfenced for
specific purposes. The Council’s position on Reserves will be
included in the Revenue Budget Strategy.
FINSUS0
3
Percentage of Financing
Costs to Net Revenue
Stream- General Fund
5.32% 5.18% 4.47% 5.40% This ratio shows a reduction in the General Fund’s ratio of
financing costs to net revenue stream.  The overall reduction
reflects a reduction in financing costs mainly due to a change in
how we account for the Council’s schools PPP project combined
with an increase in income (Council Tax, NDR and Non Ring
Fenced Government Grants).   The position reflects the product
of strategic, sustained capital investment in schools and roads
over more than twenty years.
FINSUS0
4
Percentage of Financing
Costs to Net Revenue
Stream- Housing
Revenue Account
16.31% 16.04% 13.98% 21.30% This ratio shows a reduction in the HRA’s ratio of financing costs
to net revenue stream.  The overall reduction reflects a reduction
in loan charges combined with an increase in income (Rents).
The position reflects the product of strategic, sustained capital
investment in the Council’s housing stock.
FINSUS0
5
Actual outturn as a
percentage of budgeted
expenditure
100.00% 100.00% 100.00% 98.60% The outturn reflects that the council reported a breakeven
position after all transfers to reserves.  The SLC position is
consistent across years, but movement in other councils' figures
may result in a change to our ranking going forward.
Housing Services HSN01b Gross rent arrears (all
tenants) as at 31 March,
as a percentage of rent
due for the reporting
year
8.26% 8.91% 8.70% 9.60% Resource target achieved and significantly lower than Scottish
average. A range of supports measures continue to assist
tenants facing financial hardship. Arrears have increased over
the last three financial years which reflects the pressure on rent
collection due to the overall economic position. The Council will
continue to set affordable rents and provide advice.
Performance continues to be routinely monitored with a number
of improvement actions identified.
HSN02 Percentage of rent due
in the year that was lost
due to voids
0.42% 0.60% 0.60% 1.70% Performance over the past two years has remained consistent
and the Resource continues to focus on void management to
minimise void rent loss with a number of improvement actions
83

Page 84

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
identified.
Performance in this area has been consistent among the best in
Scotland compared to other LAs . In the past three years we
have had either the  lowest or second lowest void rent loss and
well below the Scottish average.
HSN03 Percentage of dwellings
meeting Scottish
Housing Quality
Standards
93.50% 78.32% 79.70% 70.90% Performance decreased during 2022/23 due to the inclusion of
Fixed Electrical Testing and Tolerable Standards as directed by
Scottish Housing Regulator. This has been evident across other
Local Authorities with the Scottish average also decreasing.
Revised process being implemented to gain access to properties
where access has not been achieved.
HSN04b Average number of days
taken to complete non
emergency repairs
13.07 days 11.76 days 11.60 days 9.70 days The improved performance in this area, whilst still above the
Scottish average, is viewed positively because it is based on an
appointment-based system that is supported by tenants and
tenants’ representatives.
Improvement activity within the repairs service continues in
2023-24 to support the reduction of the average time taken
although the council's focus will continue to be on quality rather
than speed of service.
HSN05 Percentage of council
dwellings that are
energy efficient
93.88% 98.64% ------ ------ The 2025 and 2032 EESSH Milestones have been suspended as
the Scottish Government are reviewing the EESSH2 standards to
strengthen and realign the standard with the target for net zero
heat in houses from 2045.
In advance of the new national indicators, a review of housing
stock is underway to determine the additional energy measures
required to achieve energy efficiency and carbon reduction
requirements within the council’s housing stock.
Social Work Services SW01 Home Care costs per
hour for people aged 65
or over
£25.50 £30.47 £29.86 £30.45 Home Care costs per hour decreased in 2022-23 compared with
2021-22, which is rated as an improvement.  In South
Lanarkshire Home Care costs per hour are less than the Scottish
average of £30.45 and lower than the Family Group average of
£30.36. There was a 12% increase in the costs in South
Lanarkshire in 2021-22 from the previous year, reflecting an
84

Page 85

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
agreement to invest in an additional 4,000 hours in the service in
response to the demands of COVID and to support service
developments including new technology enabled properties at
Blantyre LIFE and the creation of the Home First reablement
service.  Following this period of intense development, the costs
per hour reduced slightly in 2022-23 as recruitment challenges
within social care prevented the service recruiting to the
remaining 1,564 of additional hours by March 2023.
SW02 Self Directed Support
(Direct payments and
managed personalised
budgets) spend on
adults 18+ as a
percentage of total
social work spend on
adults 18+
3.78% 3.98% 6.70% 8.70% Self-Directed Support (Direct payments and managed
personalised budgets) spend on adults 18+ as a percentage of
total social work spend on adults 18+, in South Lanarkshire has
increased by almost 70% from 2021-22 to 2022-23, resulting in
South Lanarkshire’s ranking improving significantly from 24 to
13. This indicator highlights only the social work spend allocated
via Direct Payments, Personalised Managed Budgets and
Individual Service Fund (ISF) - options 1 and 2. It does not
recognise local authority managed services - option 3, which
provide a legitimate choice for individuals or a default position in
the legislation for individuals who do not wish to exercise their
right to choose.
Drivers behind this improvement include:
•  A review and update of public facing SDS information to
promote all four SDS options.
•  Establishment of a Commissioning and Quality Assurance
Team.
•  Establishment of an SDS Review Team.
•  Upskilling of the Care at Home staff to complete the Living the
Life you Choose assessment and offer the four SDS options to
service users.
•  Placing self-directed support at the heart of day services
following the recent review of the service, to give service users
greater choice, flexibility, and control over their care.
Whilst improvement has been made during this reporting period,
it should be noted that wider pressures - most notably in relation
85

Page 86

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
to workforce supply and the financial challenges facing social
care - will continue to be influential.
SW03a Percentage of people
aged 65 and over with
long-term care needs
receiving personal care
at home
63.88% 61.89% 61.00% 61.50% South Lanarkshire performance decreased from 61.89% in
2021-22 to 61% in 2022-23 which is similar to the Scottish
average position of 61.5%. However, this indicator excludes
individuals who are assessed and waiting for a service which
currently accounts for approximately 1,500-2,000 hours each
week.
The introduction of Home First throughout South Lanarkshire is
supporting the strategic vision to maximise the independence of
service users, improving individual outcomes, and in doing so,
reducing the reliance on statutory services.  It provides
short-term multi-disciplinary reablement and rehabilitation
support with a focus on maximising individual choice and control
for people at home, or as close to home as possible. The
programme was successful in the Integrated Care category in
the 2022 Scottish Health Awards which recognises excellence
across health and social care services.
As well as the introduction of Home First a modernisation
programme of the Care at Home service has progressed to
respond to service demand and the increasingly complex needs
of service users which has included: the establishment of a
scheduling and response team; a new electronic scheduling
system; transfer of the Out of Hours support function from
Emergency Social Work Services to Care at Home; redesign of
co-ordination roles to reflect changing responsibilities; enhancing
the assessment and care management function; and targeted
recruitment campaigns.
Response to demand as well as an accelerated programme of
installation saw an increase in assistive technology throughout
2022-23.  For example, 4,151 telecare items and 3,163 Digital IP
Alarms were installed with 24% of hospital discharge referrals
supported through the Home First telecare pathway which
86

Page 87

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
ensured installation within 24 hours of referral being received.
SW04b Percentage of adults
supported at home who
agree that their services
and support had an
impact in improving or
maintaining their quality
of life
------ 80.00% ------ ------ Data not yet available
SW04c Percentage of adults
supported at home who
agree that they are
supported to live as
independently as
possible
------ 82.16% ------ ------ Data not yet available
SW04d Percentage of adults
supported at home who
agree that they had a
say in how their help,
care or support was
provided
------ 65.58% ------ ------ Data not yet available
SW04e Percentage of carers
who feel supported to
continue in their caring
roles
------ 28.70% ------ ------ Data not yet available
SW05 Residential cost per
week per resident for
people aged 65 or over
£659.00 £755.00 £697.00 £684.00 This measure relates to the average net cost to the council.
South Lanarkshire had a spend of £697 per week in 2022-23
compared to the Scottish average of £684.   Within the LGBF
family group costs range from £442 to £992.  The performance of
each council is influenced by demographics and contributions
made by service users. The cost of care also increases year on
year with changes to the national care home rate.
There are currently variable costs for care homes across
Scotland and it is anticipated that the review of the National Care
Home Contract (NCHC), which has not been revised since 2013,
will standardise some of this.  Although it should be noted that
87

Page 88

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
the NCHC rate will not equate to the net cost per resident, it will
impact only on local authority funded residents who are in private
and voluntary care homes, whilst others will continue to pay a
proportion of their care home fees.
SW06 Rate of readmissions to
hospital within 28 days
per 1,000 discharges
111.82 106.27 98.50 101.70 The rate of readmissions in South Lanarkshire decreased again
this year from 106.27 per 1,000 in 2021-22 to 98.50 in 2022-23
and we continue to perform better than the Scottish average.
Information on the six areas of the Health and Social Care
Delivery Plan are monitored monthly and formally reported on a
quarterly basis to the  Social Work Committee (alongside the
Integration Joint Board).
SW07 Percentage of care
services graded 'good'
or better in Care
Inspectorate Inspections
80.10% 76.08% 77.00% 75.00% The proportion of care services graded 'good' or better in Care
Inspectorate Inspections decreased nationally from 75.8% in
2021-22 to 75% in 2022-23.  However, South Lanarkshire saw
an increase from 76.08% in 2021-22 to 77.0% in 2022-23.  This
performance has resulted in South Lanarkshire's ranking
improving significantly from 26 to 17.
More regular inspection activity resumed in 2022-23 following the
agreed pause in the programme during COVID-19.  Fifty-six
inspections were completed across all care services in South
Lanarkshire during this period with in-house inspections of adult
care homes, children’s houses, fostering and adoption services.
The council has continued to implement improvement actions
from inspections with regular reports to the Social Work
Resources Committee and noting within the Chief Social Work
Officer Annual Report.
The Care Home Providers Forum established during the
pandemic has remained in place and includes representation
from independent, voluntary, and local authority care homes.
Chaired by a Social Work manager, the forum provides the
opportunity to share and signpost providers to emerging
guidance and reporting requirements, whilst acknowledging
pressures across the sector and identifying shared solutions.
SW08 Number of days people 544.22 910.36 482.00 432.00 Performance for this indicator has improved significantly from
88

Page 89

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2022/23
Service LGBF
Ref
Description
2020/21
Results
2021/22
Results
2022/23
Results
Result
Trend
Scotland
2022/23
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
spend in hospital when
they are ready to be
discharged, per 1,000
population (75+)
910.36 days in 2021-22 to 482.00 days in 2022-23. In line with
this our ranking shifted from 25 to 22.
The initial work undertaken as part of our Discharge without
Delay (DWD) programme has now been subsumed within
Operation Flow. Hospital staff and other partners work together
closely to establish clear timeframes of when someone will go
from hospital to community.
Early and effective discharge planning puts the patient at the
centre of the process, it improves the benefits for those currently
in hospital by discharging home at the earliest and safest
opportunity and creates capacity for patients who require
admission.
We continue to embed the Home First approach across the
localities. This re-ablement approach optimises independence
over a six week period, enabling people to remain in their own
homes, or supporting discharge from hospital with the support of
health, social care and third sector provision to meet any
ongoing needs identified.
89

Page 90

90

Page 91

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 19 November 2024
Report by: Executive Director (Finance and Corporate
Resources)  
Subject: Transformational Reviews – Cross-Cutting – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Cross-Cutting Reviews that are part of the Council’s
Transformational Change Programme for the year 2025/2026 
2. Recommendation(s)
2.1. The Performance and Review Scrutiny Forum is asked to approve the following
recommendation(s):- 
(1) that the update on the Transformational Reviews be noted.
[1rec
3. Background
3.1. In June 2024, a report titled 2025/2026 to 2027/2028 Revenue Budget Strategy was
presented to the Executive Committee. This report highlighted the need for
Transformational Change to manage the significant Budget Gaps facing the Council
over the next 3 years. 
3.2. The Transformational Change Programme is intended to drive continuous
improvement as well as efficiencies and feeds into the Budget Strategy to deliver
savings for 2025/2026 to 2027/2028. The foundation of this Transformational Change
Programme is a series of Cross-Cutting Reviews. These Cross-Cutting Reviews are
not focussed on one Resource but on Council-wide activities. 
3.3. An initial paper on the Transformational Change Programme titled, Cross-Cutting
Reviews – Update, was presented to the Performance and Review Scrutiny Forum on
27 August 2024. 
3.4. This report will provide a further update on the Cross-Cutting Reviews which are part
of the Council’s Transformational Change Programme, and this will include any
savings proposed for the 2025/2026 Budget Strategy as a result of these reviews
(Section 4).  
6
91

Page 92

4. Transformational Change Programme – Cross Cutting Reviews
4.1. As noted above, the foundation of the Transformational Change Programme is a
series of Cross-Cutting Reviews. Each review is taken in turn with a summary of their
output. The actual savings proposed to date, for each of the Cross-Cutting
Transformational Reviews is included in Appendix 1.  The savings identified from the
Cross-Cutting Reviews noted in this report were presented to the Executive
Committee for consideration as part of the 2025/2026 savings pack with a view to
reducing the Budget Gap for that year.   
4.2. Charging: This review of Council charges looked at all charges made by the Council
and the basis for their charge, including those not recovering their costs.  It also
considered whether the increase in our charges over recent years has kept in line with
the trend in inflation. It was identified that, where an inflationary rise has been applied
over the last 5 years, this has not followed actual UK inflation – we have applied
increases of around 16.8% whereas inflation across the UK has been closer to 33.6%. 
4.3. A proposal has been included in the 2025/2026 savings pack that an inflationary
increase of 14.4% is applied across all charges that are not statutory or covered by
other reviews, plus 1.5% year on year inflation, to calculate new charges for
2025/2026, generating £0.190m. In addition, a proposed inflationary increase on
parking tariffs and season tickets has also been included, generating £0.185m. The
total saving proposed for 2025/2026 is therefore £0.375 million (detailed in Appendix
1). 
4.4. Procurement: This review focuses on procurement practices across the Council to
ensure the maximum level of efficiencies and identify cashable budget savings. This
review has identified that savings can be generated through a focus on demand
management opportunities (buying less or not at all), alternative product specifications
and new routes to market. Ten savings opportunities have been identified for inclusion
in the 2025/2026 savings pack, totalling £0.955 million.  These are listed in Table 1: 
Table 1:  Procurement Savings 2025/2026
Proposal Savings
£
m
Parent Council Insurance 0.014
Physiotherapy 0.050
Couch Roll (Blue Roll) 0.024
CCTV 0.070
Diamond Tipped Blades (for Roads Stone Cutting) 0.004
Construction Materials 0.611
Washrooms 0.077
Biomass Maintenance 0.042
Refuse Sacks 0.033
Social Work Contract 0.030
Total 0.955 
4.5. This review is ongoing in order to identify further savings opportunities for 2026/2027
and beyond.  
92

Page 93

4.6. Overtime: This review of overtime practices and spend with a view to reducing
expenditure and remove/reduce associated risks. Resources have been working in
conjunction with Personnel Services to prepare action plans to meet the outcomes
associated with reducing overtime across the Council and, through removing
enhanced overtime expenditure and reducing and containing plain time overtime
expenditure, savings of £0.364 million can be realised in 2025/2026.   
4.7. The detail across Resources is shown in Table 2. 
Table 2 – Overtime Saving 2025/2026
Resource Proposed
Reduction
2025/26
£m
Community and Enterprise  0.125
Education  0.000
Finance and Corporate                              0.030
Housing and Technical      0.150
Social Work                                                0.059
Total  0.364 
4.8. This review is ongoing and will look to identify further savings opportunities for
2026/2027 and beyond. 
4.9. Management Structures: This is a Personnel led review to ensure correct balance
between management and the staff they oversee. This review refers to the
Organisational Structure Models which were agreed and implemented formally in
2009/2010 and considers how closely aligned the current structures are to the agreed
operating models. The review identified service areas where efficiencies can be
identified by aligning more closely with the model, while also ensuring consistency
across Resources in terms of management workload and responsibility. The
2025/2026 savings pack contains a proposal to increase the spans of control for these
services areas and generate savings totalling £1.000 million. 
4.10. This review is ongoing in order to identify further savings opportunities for 2026/2027
and beyond. 
4.11. Loans Fund: The review considered two areas of Loans Fund Accounting with a view
to realising benefits in relation to the payment of debt. As a reconsideration of the
previous work on the Loans Fund Review / Additional Voluntary Repayments,
opportunities were identified in relation to avoiding additional voluntary debt
repayments. In addition, the Council has previously implemented accounting
adjustments for Service Concessions which allowed us to reprofile the debt payments
of our Public Private Partnership (PPP) arrangements. A new accounting standard has
been implemented nationally (IFRS16), which gives us scope to take the Service
Concessions approach a step further. This means that we can not only reprofile the
PPP debt repayments, but also other elements of the PPP payments such as the asset
rental.  
93

Page 94

4.12. This review has now concluded, and a proposal to use the £6.600 million reduction in
loan charges in 2025/2026 to reduce the Budget Gap in that year, was included in the
recent paper to the Council’s Executive Committee.  Further annual savings are also
available, and the full details are included in the Executive Committee report (13
November 2024).   
4.13. As well as the initial tranche of reviews above, there are other Cross-Cutting Reviews
that will progress into future years, but that will have no financial impact in 2025/2026.
These reviews have now commenced and will be developed over the coming months
with a view to delivering savings in 2026/2027 and beyond.  As noted in the previous
report, the progress on each Cross-Cutting Review will be presented to the
Performance and Review Scrutiny Forum and any review that has outcomes which
require approval, will then be presented to the appropriate Committee. These next
reviews are detailed in the following sections. 
4.14. Fleet: This review sets out the Fleet principles that Services should consider as part
of their ongoing workstreams in order to lower operational expenses and extend the
lifespan of vehicles. A Terms of Reference (ToR) was presented in the last update
report to the Forum (August 2024). Work is ongoing throughout Autumn / Winter 2024
to consider the number of vehicles used by Resources and rightsizing the Council’s
fleet. 
4.15. Digital Transformation: A review of the use of technology will impact on all Reviews
and will focus on how the Council and its customers interact. Three key areas are
being considered: 
• Business Systems & Processes: projects and improvements to key corporate and
line of business applications.
• Workforce Productivity: focus on enabling and empowering staff to maximise their
effectiveness and digital literacy.
• Customer Engagement: clear & consistent Council-wide customer engagement. 
4.16. Digital Transformation will cover a range of activities across Resources primarily
aimed at supporting Resources to achieve service delivery efficiencies. This will be
achieved by undertaking assessment and benchmarking alongside the development
of a detailed project plan, followed by the development of standard methods and
approaches to transformation which will then be deployed and applied to Services. 
4.17. A ToR has been prepared for this review and is attached in Appendix 2 for information. 
This details the extent of the review and what it intends to achieve.  It also includes
timescales for delivery. 
4.18. Customer Engagement: This review is closely aligned with the Digital Transformation
review and will see the development of a Council Customer Engagement Strategy to
improve digital engagement, accessibility and create efficiencies. The review will
identify opportunities for service improvement, cycle time reduction and cost saving
through transformation of customer contact processes in the main customer facing
Resources and will consider the introduction of new technologies and processes to
deliver efficiency-led, customer services and engagement. 
4.19. A ToR has been prepared for this review and is attached in Appendix 3 for information. 
This details the extent of the review and what it intends to achieve.  It also includes
timescales for delivery. 
94

Page 95

4.20. Property: As advised in the previous report, the Review to look at the Council’s use
of property will be far reaching, covering all Resources and South Lanarkshire Leisure
and Culture, and all areas of Service delivery.  The condition, running costs, quality,
performance, location, and use of Council assets will all be considered with the
challenge being to consider the right portfolio of buildings, creating an affordable,
efficient, fit-for-purpose and sustainable core estate that supports the move to net
zero, improves service quality, is people centred and is service driven. The cost of
achieving the Net Zero targets is significant and there is no additional funding being
made available for this at this point in time. 
4.21. All buildings will be reviewed for co-location opportunities with a view to being
multifunctional, flexible, and adaptable to meet the combined needs of services and
service users and promote joint working. This is likely to reduce the number of
properties the Council has.  An initial paper on this Review was presented to the
Performance and Review Scrutiny Forum on 27 August 2024 (South Lanarkshire
Council / South Lanarkshire Leisure and Culture – Vision for Future Relationship). 
This review is ongoing.   
4.22. The final 2 Cross-Cutting reviews, which have not yet commenced, are detailed below
for information. 
4.23. In-house and Procured Services: Consideration will be given to the costs of inhouse
service provision compared to the cost of procuring these same services from external
marketplace. 
4.24. Depot Rationalisation: A review of the use and users of the depots will be carried out
to consider optimal use of depots across Resources/Services. 
4.25. Alongside the Cross-Cutting Reviews, Resources are considering their own Service
areas, and a programme of Reviews has taken place to inform savings for the coming
year. The first tranche of reviews has now concluded, and savings proposals have
been presented to Members for their consideration in as part of the Budget setting
process. 
5. Employee Implications
5.1. There are no direct employee implications from this report. 
6. Financial Implications
6.1. The financial implications are summarised within the report. 
7. Other Implications
7.1. The Transformational Change Programme of reviews will drive improvement and
generate efficiency savings for the Budget Strategy across the years 2025/2026 to
2027/2028.  The main risk is that these reviews do not deliver efficiency savings as
planned however, this risk has been assessed as low given the detailed management
of these reviews at a senior level in the Council, as well as the ongoing Elected
Member governance at the Performance and Review Scrutiny Forum. 
7.2. There are no implications for sustainability in terms of the information contained in this
report.  
95

Page 96

8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no integrated impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
16 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 26 June 2024
 Performance and Review Scrutiny Forum, 27 August 2024 
List of Background Papers
 2025/2026 to 2027/2028 Revenue Budget Strategy
 Cross-Cutting Reviews – Update (Performance and Review Scrutiny Forum, August
2024) 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601  (Tel: 01698 452601)
lorraine.o'hagan@southlanarkshire.gov.uk 
96

Page 97

Appendix 1
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
M&O01 All Procurement 
This proposal sees efficiencies and savings generated through a focus on demand management
opportunities (buying less or not at all), alternative product specifications and new routes to market. 
Opportunities have been identified for inclusion in the 2025/2026 budget strategy.   
The total savings proposed for 2025/2026 is £0.955 million. 
- 0.955
M&O02 All Overtime 
Resources have been working in conjunction with Personnel Services to prepare action plans to
meet the outcomes associated with reducing overtime across the Council. 
Through removing enhanced overtime expenditure and reducing and containing plain time overtime
expenditure, savings of £0.364m can be realised in 2025/2026.  This is summarised across
Resources in the table below: 
Resource / Service  2025/2026 
Saving
Community and Enterprise £0.125m
Finance and Corporate £0.030m
Housing and Technical  £0.150m
Social Work  £0.059m
Total £0.364m 
- 0.364
97

Page 98

Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
M&O03 All Management Structures 
This proposal considers spans of control across all Resources in order to review the number of
management and supervisory posts. This is to ensure consistency in the balance of managers and
front-line staff as well as to identify and remove any anomalies with direct Grade 5 to Grade 5 and
Grade 4 to Grade 4 reporting. 
Services were identified which currently operate with lower spans of control than what is
recommended by the Preferred Operating Model. In eight of these service areas, efficiencies can
be increased across by aligning more closely with the model, while also ensuring consistency
across Resources in terms of management workload and responsibility. 
Target ratios for these eight service areas have been proposed which would see an increase to
spans of control, generated by a reduction of management and supervisory roles, creating savings
totalling £1.000m in 2025/2026. It is anticipated that this will affect 16.85 FTE. 
16.85 1.000 
COR01 All Council Charges 
The cross-cutting review of Council charges has looked at all charges made by the Council and the
basis for their charge, specifically those not recovering their costs.  It has also, considered whether
the increase in our charges over recent years has kept in line with the trend in inflation.   
This exercise identified that where an inflationary rise has been applied over the last 5 years this
has not followed actual UK inflation.  In general, we have applied around 16.8% whereas inflation
across the UK has been closer to 33.6%.  To bring us in line approximately 14.4% would be
required to be applied in a single year.  It is therefore proposed to apply an inflationary increase of
14.4% across all charges that are not statutory or covered by other reviews plus 1.5% year on year
inflation to calculate new charges for 2025/2026.  This would generate £0.190m of additional
income. 
In addition, it is proposed to apply an inflationary increase across parking tariffs from 80p to £1 for
the lower charge and rising by an equivalent percentage increase across longer stay parking tariffs
and season tickets. This would generate £0.185m of additional income. 
The total savings proposed for 2025/2026 is therefore £0.375 million.
- 0.375
98

Page 99

APPENDIX 2
Transformational Review – Terms of Reference 
1. Review Title Digital Transformation
2. Background Digital Transformation in local government has been happening for
some time but with the current financial and service demand
challenges a step change is now needed to avoid putting services at
risk. 
Digital Transformation covers a broad spectrum of activity, and a
coordinated programme is required to ensure resources are suitably
deployed to priority projects across Resources to deliver maximum
efficiency returns. 
Changes to individual business processes can deliver efficiency and
financial savings but only at small incremental levels while
opportunities for larger scale change, at team, service or resource
level provide more significant benefits, both tangible and intangible
but at more risk. 
There are three themes that are potential programme areas for Digital
Transformation. 
• Business Systems & Processes: projects and improvements to
key corporate and line of business applications. 
• Workforce Productivity: focus on enabling and empowering staff
to maximise their effectiveness and digital literacy. 
• Customer Engagement: clear & consistent Council-wide customer
experience. 
These will be underpinned by common methods, approaches and
skills. 
3. Identified Issues The issue of public sector financial pressures is a significant challenge
facing SLC, and digital transformation can play a crucial role in
addressing this. 
The increasing costs of services have created a financial strain on
local authorities. Identifying and addressing inefficiencies in service
delivery can help to reduce costs and improve value for money. This
could include streamlining manual processes and automating tasks to
reduce administrative burden and improve efficiency 
The Council is data rich but information poor, so increasing the quality
and maturity of our data and the data literacy of our staff is critical. 
There is a need to mitigate the impacts on staff and citizens of
efficiencies to maintain service levels. 
Ensuring that digital services are accessible to all residents, including
those with disabilities or limited digital literacy. 
There is a need to have a clear vision that sets out the end state of
the transformation activity. 
4. Identified Outcome(s)  Development of a clear vision for digital at South Lanarkshire Council. 
Across the key three themes, the outcomes include: 
99

Page 100

Business Systems & Processes
• Links to other line of business systems with goal of very efficient
internal systems all integrated appropriately
• Process improvement using standard methods
• Upgrades & opportunities for automation
• Use of Enterprise architecture to ensure we are getting the best
out of our systems
• Clear ‘owner’ of each system and consistent approach to system
exploitation
• Standard operating procedures (SOPs) for each process 
Workforce Productivity
• Getting the most out of standard Office tools
• New ways of working
• Embedding & enhancing use of Microsoft 365 - new tools to
create, communicate, collaborate, store, plan, automate, analyse
& report
• Technologies to support the frontline
• Increase organisational readiness for new business capabilities
• Staff digital empowerment 
Customer Engagement (led by Customer Service
Transformational Review)
• Clear, organisation-wide Customer Engagement Strategy
• New website & supporting systems as foundation for improved
customer experiences across the Council
• Links to other line of business systems that the customer uses
• Replacement of legacy forms / processes and introducing
common elements to improve customer experience
• Process improvement using standard methods
• Prioritised workplan based on customer need
• New technologies to improve the customer journey, based on
customer preference
• Better use of customer data 
Alignment with the Digital Council of the Future operating model being
developed by SOLACE and Improvement Service, supported by the
Local Government Digital Office. 
Demonstration of best value and alignment with Audit Scotland report
on ‘Transformation in councils’ 
Data analytics and automation will be used to identify inefficiencies
and optimise service delivery. 
5. Scope of Review The project will include: 
• Development of a detailed project plan
• Assessment of Digital Maturity using Digital Office self-
assessment tool to underpin development of prioritised workplan.
• Development of a Digital Council Vision or Visions. This vision
would be central to a concerted focus on Digital Transformation.
• Project reviews and lessons learned will be held within a
reasonable timeframe following go-live of major system upgrades,
with a focus on moving to the next stage of exploiting the new
systems and leveraging the investment in them.
• Development, training and deployment of enabling tools and
methods.
• Development of Data group to assess data quality and maturity
and develop an approach to moving those forwards.
• Support other cross-cutting and service-specific reviews bringing
tools and skills to bear to assist with achieving efficiencies and/or
mitigating impacts.
• Develop a skills framework to support staff development, Learning
& Development and recruitment.
100

Page 101

• Engage with other Councils, Digital Office and Improvement
Service to collaborate on transformation opportunities, including
Artificial Intelligence and other innovative technologies.
• Identify and development common approaches and tools for
workforce productivity, with a key focus on Microsoft 365.
• Adoption and promotion of the Scottish Approach to Service
Design 
The project will not include:
• Customer Engagement as this is covered separately in a specific
Customer Services Transformational Review. 
6. Resources affected: -
Community
and Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
7. Trade Union, Personnel Team, and Management Engagement 
Trade Unions should be engaged, and it is proposed that representatives are invited to join the
appropriate governance group of the project. 
Personnel, specifically Learning & Development will require to be engaged to support skills gaps
and wider business change. 
As this project is cross-Resource, relevant Resource management representation are invited to
join the appropriate governance group of the project. 
8. Key aims of/outcomes from project 
Service/operational Introduction of new technologies and processes to enable and deliver
efficiencies across the Council.
Employee To ensure staff have the necessary skills and capacity across the
relevant Council services to support service change
To ensure staff have awareness of their digital and data literacy
To reduce digital exclusion of staff
To improve staff effectiveness and utilisation
Focus staff on value activities 
Other To improve the digital engagement with the citizen in line with
Customer Engagement Strategy
To reduce digital exclusion in the authority area
9. Key milestones 
• Terms of Reference to CMT – 29 October 24
• Interim report to CMT – 10 December 24
• Detailed initial Action Plan available – 31 January 25
• Final report to CMT – 4 February 25 
10. Monitoring and reporting arrangements 
• Regular meetings scheduled with Sponsor
• Project Review Board structure with cross-Resource and Trade Union representation
• Project Steering Group structure with cross-Resource Trade Union representation
• Interim and final report to CMT.  
• 
11. CMT Sponsor / Lead Officer 
Sponsor: Jackie Taylor, Executive Director, Finance and Corporate
Lead Officer: Murray Husband, Head of IT Services, Finance and Corporate 
101

Page 102

12. Project resourcing 
• Core project team consisting of Project Manager Lead, Project Officer(s), subject matter
experts on Service Design, Data Analysis, Business Analysis and Business Change in
addition to technology specific expertise
• Resource/Service representatives relevant to the activities
• Trade Union representative(s) at the relevant level (PSG/PRB)
• External support and advisory from Digital Transformation consultancy
• Assistance as required from Local Government Digital Office and Improvement Service 
102

Page 103

APPENDIX 3
Transformational Review – Terms of Reference 
1. Review Title Customer Engagement Transformational Review 
2. Identified Issues Progress has been made in offering customers greater use of online
forms and this has reduced the volume of calls being handled by
Customer Services and provided cost reductions. This progress
requires to be built upon through the introduction of new technologies
to meet customers’ needs. 
Customer services functions are located at two locations because of
the historical requirement for server support for the 24-hour control
centre. 
There is scope to increase the automation of processes to support
customer requests. 
Most customer calls come through the Customer Services Centre,
where there are challenges in resourcing significant surges in demand
that are becoming more common because of an increase in the
number and severity of severe weather events. 
The councils existing CRM system has limited functionality. Integrated
online forms offer self-service and provide an efficient way of
processing customer requests but their use is restricted by the many
operational systems with different configurations. 
The approach to assessing customer experience is varied across the
council, with specialist customer contact services within Resources. 
Customer Services includes responsibility for the Community Alarm
service, a service that provides vital care support for Social Work
service users and works closely with the Responder Service and the
Technology Team, both outwith Finance and Corporate Resources. 
There is no single customer contact or engagement approach so the
customer will experience differing levels of contact over differing
mediums. There is a greater divergence in approaches to customer
contact across council services. 
The website is a key digital channel for the Council but is outdated and
contains much aged or duplicate information which can be confusing
for the customer. 
The council has a variety of customer facing systems across the
Resources Customer contact channels and methods are not
consistent to the customer and there is no consistent way across
services to engage with customers over different channels. 
The telephony system lacks development and at times has struggled
to cope with significant peaks in demand. 
Services will typically design a customer process with the service
operations the primary focus. 
3. Identified Outcome(s)  • Develop a Council Customer Engagement strategy
• Identify opportunities for service improvement, cycle time
reduction and cost saving through transformation of customer
contact processes in the main customer facing Resources. 
• Appraisal of the strategic positioning of customer services within
the Council and proposal for most efficient operating model.
• Investigate alternate technology to bring customer contact into a
single Council customer engagement platform to improve
103

Page 104

consistency of customer engagement and reduce duplicate
Council touch points by customers.
• Ensure the needs of all stakeholders are met including those who
are economically/digitally or otherwise disadvantaged.
• Assessment of the telephony infrastructure and any required
investment. 
4. Scope of Review The project will include: 
• Scoping customer services functions, systems and processes
across the council and evaluation of the different delivery models 
• An assessment of the maturity of the model in terms of use of
technology and degree of channel shift achieved. 
• Assessment of the digital maturity of key customer facing service
processes
• Review the capabilities and limitations of customer facing ICT
systems including Customer Relationship (CRM) and website.
• Review of customer services website content
• Identify opportunities to streamline both internal and external
processes using the Scottish Approach to Service Design
• Evaluation of performance information 
• Benchmarking with other LAs/wider customer service provision
including participation in the new Scottish local authority Customer
Services group 
• Completion of a SWOT analysis to support future developments 
• Identification of ways to utilise data more effectively in customer
interactions by working with the Data Quality Group
• Appraisal of transformational opportunities from:
o Unified communications
o Live chat
o Customer self-service
o Automation/workflow
o Chatbots and artificial intelligence
o Management reporting/analytics 
• Identify the significant systems of record (e.g., Housing and
Council Tax) and understand how a corporate platform could
interact with these systems to deliver consistent customer facing
processes
• Identification and ranking of opportunities – develop a “pipeline”
also recognising existing priorities and commitments for customer
self-service, SMS, telephony automation and back-office
integration 
• Development of a business case for service change
• Quantification of potential savings
• Integrated impact assessment 
5. Resources affected: -
Community
and Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
6. Trade Union, Personnel Team, and Management Engagement 
Representatives from TU, Personnel and Management will be part of the project team. 
104

Page 105

7. Key aims of/outcomes from project 
Service/operational Introduction of new technologies and processes to deliver customer
services that deliver efficiencies.
Employee To ensure staff have the necessary skills and capacity across the
relevant Council services to support service change.
Ensure the most effective staffing structure is in place. 
Other Provision of a Customer Engagement strategy for the Council and to
improve the digital engagement with the citizen while ensuring service
are accessible. 
8. Key milestones 
• Agreement of Terms of Reference with the Corporate Management Team (29 October 2024) 
• Preparation of project plan (29 November 2024)
• Appointment of consultancy support (31 December 2024)
• Reporting to CMT (throughout the review) 
9. Monitoring and reporting arrangements 
• Reporting to CMT Efficiencies
• Project Review Board and Project Steering Group 
10. CMT Sponsor / Lead Officer 
Jackie Taylor, Executive Director (Finance and Corporate Resources)
Craig Fergusson, Head of Finance (Transactions)
Murray Husband, Head of IT 
11. Project resourcing 
• Project team
• Trade Union representation 
• External support 
• Assistance as required from Local Government Digital Office 
105

Page 106

106

Page 107

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 19 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject:  Review of Routes to Work South 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 set out the Terms of Reference for the review of Routes to Work South
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report and Terms of Reference, attached at Appendix 1,
be noted.
[1recs]
3. Background
3.1. Routes to Work South (RTWS) is a South Lanarkshire based company limited by
guarantee and a registered charity that delivers a range of employability programmes
on behalf of South Lanarkshire Council. RTWS was established in 2001 and operates
as an Arms-Length External Organisation (ALEO) of the Council, delivering services
through Teckal arrangements.   
3.2. At the date of its incorporation, RTWS had three public sector members: the Council
(SLC), Scottish Enterprise Lanarkshire (SEL) and the Department for Works and
Pensions (DWP). Given changes to the legal structure of Scottish Enterprise, and a
review of participation in local bodies by DWP, in 2011 SEL and DWP resigned as
members of RTWS. This was reported to Enterprise Resources Committee on 14
September 2011 and a decision taken that the Council would remain as sole member.
The directors of RTWS agreed that the company would continue to work with the
Council, on the basis that the objectives of the company would broadly match those
of the authority. The independence of the company was protected through its Board
structure with four out of ten Board places reserved for the Council.   
3.3.    The RTWS’s Articles of Association (“the Articles”) limit the Council’s liability for the
company’s debts to £1.00. The role of members is set out in the Articles of Association
of RTWS. The members do not own the company but control the company through
their choice of directors, and through those directors’ decision-making at General
Meetings. The assets of RTWS such as equipment, contracts or property holdings are
owned by the company and not by the Council.  The Council has no liabilities other
than the £1.00 limit for any debt.  
7
107

Page 108

3.4.  The responsibility for the day to day running of the company lies with the directors. 
The Articles provide for a maximum of ten directors, four from the Council and six co-
opted directors.  The Council appoints its directors and these directors as a group
appoint the other directors. To retain their charitable status RTWS cannot have the
Council with the majority of the director positions. There are currently six directors in
position including 3 from the Council, Councillor Catherine McClymont and Councillor
John Anderson and also Douglas Hashagen, Employability Manager. The remainder
of the board is made up of 3 South Lanarkshire residents. 
3.5. RTWS’ main office is CTEC in Cambuslang which is rented from the Council for a
nominal fee. Services are also provided through RTWS offices in Lanark and at the
EK Work and Training Hub in the Plaza, East Kilbride which is part funded by the
Council. 
3.6. RTWS had a staff team of 51 as of 1 April 2024.  
4. Funding and Contractual Arrangements
4.1. As an ALEO, RTWS activity is delivered under a Teckal contract which is negotiated
on an annual basis. A ‘Teckal’ contract is a legal exemption to the public procurement
rules where a public authority does not have to tender a public contract and the
contract can be awarded directly by the Council to a separate legal entity, subject to
certain requirements being met.
. 
4.2. The requirements to justify the use of the ‘Teckal’ exemption are:-
 the Council exercises control over RTWS similar to that it exercises over its own
departments;
 RTWS carry out over 80% of their activities for the Council; and 
 there is no private sector ownership in RTWS. 
4.3. The Council funding which supports the contract includes a blend of UK Government
Shared Prosperity Funds (UKSPF) and Scottish Government No-one Left Behind
(NOLB) and SSE Sustainable Development Fund with a total value of £2,330,657 for
2024/2025. 
5. Programme Delivery
5.1. RTWS delivers a range of programmes on behalf of the Council. These include: 
Gateway to
Employment: 
Keyworker based adult employability programme
targeting unemployed and economically inactive people
experiencing barriers to employment. Participants are
supported by a keyworker and can access a range of
training and learning opportunities and health related
interventions.
Making it Work  Employability support programme targeted at eligible
parents to support them into sustainable employment. 
Rise  Rise is delivered is part of the Aspire programmes and
provides employability and personal development
focused groupwork to young people at risk of becoming
unemployed when they leave school. 
Reach  Youth employability training programme focused on
young people aged 16-19
108

Page 109

5.2. During 2023/2024, RTWS engaged with over 1,300 participants, with 580 people
progressing to employment. 
6. Rationale for Review
6.1. A review of employability services took place  in 2022/2023 and resulted in the transfer
of the employability service to Community and Enterprise Resources. The review has
reduced duplication, achieved savings and ensured the service is flexible and
responsive to the changing funding climate.  However, elements of duplication remain
between the Council and RTWS and a wider review of RTWS will provide opportunities
to further explore opportunities to reduce duplication and achieve best value. 
6.2. Since RTWS was established and then reviewed in 2011, the funding and policy
context has changed significantly, and a review will be worthwhile to establish if the
model is fit for purpose. Specific changes include: 
 All Scottish Government employability funding is now delivered through the No-
one Left Behind approach that routes funding through Local Employability
Partnerships (LEPs). This has reduced RTWS’ access to non-Council
employability funds and the LEP / Council now funds almost 100% of RTWS
activity.  
 Until 2023, RTWS’ teckal contract was delivered as part of the Council’s
European Social Fund (ESF) employability pipeline programme which provided
funding over a 6-year period. Current delivery is supported by SG NOLB which
is funded through annual grants and UKSPF which is currently in place to March
2025. 
6.3. The South Lanarkshire Local Employability Partnership’s (SLLEP) Annual Investment
Plan embeds the Scottish Government’s ‘Scottish Approach to Employability’ across
all local employability provision. This approach is a significant change from previous
delivery models, including those delivered by RTWS, which were often based on
payment-by-results and did not provide the same level of flexibility. A review of RTWS
will provide an opportunity to review delivery models and ensure they meet the needs
of participants in-line with current policies. 
7. Review Options 
7.1. The review will consider the following options for future service delivery: 
1. Retain the status quo
2. Withdrawn Council membership of RTWS and deliver all services in-house
3. Withdraw Council membership of RTWS and competitively tender current
services
4. Withdraw Council membership of RTWS and deliver a blend of in-house and
procured services 
5. Maintain Council membership of RTWS and current Teckal arrangements and
review programme delivery to reduce duplication between RTWS and the Council 
8.  Employee Implications
8.1.  The review will consider the employee implications of all options. 
9. Financial Implications
9.1. RTWS’ Council funded services are delivered through temporary external funding
(SPF, NOLB and SSE Sustainable Development Fund) with a total value of
£2,330,657 in 2024/25.  
109

Page 110

9.2 Current funding arrangements are in place until March 2024. It is likely that NOLB
grant funding will continue in 2025/26 at a similar level to 2024/25.  The UK
Government budget in October 2024 included a reduction in SPF of around 40%
nationally. It is not clear at this stage how this will impact on local authority budgets
however it is likely there will be a reduction. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained within this report. 
11. Other Implications
11.1. The are no other implications arising from this report 
12. Integrated Impact Assessment and Consultation Requirements
12.1. An Integrated Impact Assessment and consultation process will be undertaken as
part of this review. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 October 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Fair, open and sustainable 
Priorities
 We need to put people first and reduce inequality 
Outcomes
 Inspiring learners, transforming learning, strengthening partnerships
 Thriving business, fair jobs and vibrant town centres 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would further information, please contact:-
Douglas Hashagen – Employability Manager
Tel; 0141 584 2915
Email; douglas.hashagen@southlanarkshire.gov.uk  
110

Page 111

Appendix 1
Terms of Reference 
1 Review Title Routes to Work South Review 
2 Identified Issues 
Routes to Work South (RTWS) is a South Lanarkshire based
company limited by guarantee and a registered charity that delivers a
range of employability programmes on behalf of South Lanarkshire
Council. RTWS was established in 2001 and operates as an Arms-
Length External Organisation (ALEO) of the Council, delivering
services through Teckal arrangements. 
Current arrangements have been in place since 2011 and recent
developments have prompted a review to establish whether best
value can be achieved by funding / delivering employability services
through alternative arrangements. These developments include: 
- A review of employability identified areas of duplication which
have been partially addressed by the establishment of a
single team within Community and Enterprise Resources with
associated savings, however potential elements of
duplication remain particularly between the Council and
RTWS.
- Changes in employability funding which mean RTWS can no
longer access the same range of funding from non-SLC
sources and the Council effectively funds 100% of RTWS’s
income.
- Changes in employability funding mean the council now relies
on annual grants which are typically received after the start of
the financial year leading to delays in the award of RTWS’
Teckal contract. 
RTWS’ teckal contract is funded by the council through external
sources (Scottish Government No-one Left Behind and UK Shared
Prosperity Fund)
Identified Outcome(s)   The review will present a preferred option for future delivery of
employability services from the following: 
• Retain the status quo
• Withdrawn Council membership of RTWS and deliver all
services in-house
• Withdraw Council membership of RTWS and competitively
tender current services
• Withdraw Council membership of RTWS and deliver a blend
of in-house and procured services 
• Maintain Council membership of RTWS and current Teckal
arrangements and review programme delivery to reduce
duplication between RTWS and the Council 
3 Scope of Review The review will consider: 
- RTWS’s performance 
- The extent of duplication between RTWS and Council
services
- The lived experience of employability participants 
- The views of local employability partners 
- The financial costs / benefits of the options identified above
- The employee implications of the options identified above 
111

Page 112

4 Resources affected: -
Community
and
Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
☒ ☒   
5 Financial overview (£m) to be completed by finance where appropriate 
CER EDR FCR HTR SWR 
Employee costs     
Property costs     
Supplies and services     
Transport charges     
Admin costs     
Payments to other Bodies £2.331m    
Payments to Contractors     
Finance charges     
Total expenditure £2.331m    
Fees and charges     
Other income     
Total income £2.331m          
Net expenditure     
6 Key aims of/outcomes from project 
Service/operational Reduction of duplication in service delivery
Employee Consideration of TUPE implications 
Other 
7 Key milestones 
Review to be completed by 18 February 2025. 
8 Monitoring and reporting arrangements 
CMT Efficiency 
Performance and Review Scrutiny Forum 
9 CMT Sponsor / Lead Officer  
David Booth 
10 Project resourcing 
Employee time 
112

Page 113

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 19 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Agile Working Guidance 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Performance Review and Scrutiny Forum with an overview of the
proposals for reviewing agile working arrangements across the Council
[1purpose]
2. Recommendation(s)
2.1. The Performance and Review Scrutiny Forum is asked to approve the following
recommendation(s):-
[recs]
(1) that the contents of the report be noted; and
(2) that the Agile Working Terms of Reference, attached at Appendix 1, be noted.
[1recs]
3. Background
3.1. The Covid-19 pandemic was instrumental in changing how the Council delivers its
services, and since 2020 there has been a significant shift to digital and a gradual and
planned reintroduction of service delivery which, over the last four years, has resulted
in a range of flexible and agile working arrangements in place across the Council. 
3.2. When re-introducing services, Resources were encouraged to make full use of any
advances in technology and new ways of working that would ensure service delivery
for customers was not negatively impacted, for example, when attending meetings
virtually, agile working, and for a range of other flexible working arrangements.  These
arrangements would be subject to ongoing review. 
3.3. The move to more flexible working arrangements has also resulted in a change in
employees working patterns.  Therefore, as the current arrangement have been in
place for 3 years, it’s appropriate to review the agile working arrangements in place
across the Council. 
4. Review Process
4.1. A term of reference is attached at Appendix 1 for the work to develop guidance in
relation to agile working.   A key consideration has to be that Service users and
customers continue to have full access to Council personnel and services despite any
agile working arrangements. 
8
113

Page 114

4.2. It is important to ensure there is clarity on the standard of service that we are providing
to our communities.  Alongside this review of agile working is a review of Corporate
Standards (which is the topic of another paper to this meeting).  
4.3. To support a review of agile working, benchmarking will take place to gather 
information on the arrangements in place in other local authorities and we will carry
out a survey to ascertain an accurate position on current arrangements in place across
the Council.   
5. Employee Implications
5.1. Agile working has been in place since 2021 and there are benefits which have resulted
from working this way that balances home and office-based working. 
5.2. Whilst maximising the benefits of agile working, the Council must balance the benefits
to employees and the workforce with ensuring that the Council meets the needs of
customers and the community accessing Council services. 
6. Financial Implications
6.1. There are no financial considerations contained within this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There may be implications relating to climate change, sustainability and the
environment arising from this report if there is an increase in employees travelling
more to work from Council buildings or reducing use of heating and lighting use at
home.  A further assessment is required to establish this. 
8. Other Implications
8.1. Agile working arrangements have been in place for some time and there is confidence
that the current office space and IT equipment meets current needs. This will continue
to be monitored to ensure there is support to work in an agile way going forward.   
8.2. The balance of home and office working needs to ensure there is no risk to access to
services or service provision for customers and service users in South Lanarkshire. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. An integrated impact assessment is not required in relation to this report, this will be
further assessed as the review progresses.   
9.2. Trade unions will be consulted as part of the review. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
114

Page 115

Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Michelle Milne
Ext:  4330  (Tel:  01698 454330)
E-mail:  michelle.milne@southlanarkshire.gov.uk@southlanarkshire.gov.uk  
115

Page 116

Appendix 1
Agile Working – Terms of Reference 
1. Review Title Agile Working Guidance
2. Background The Council has gone through a period of change over the last
decade, as customers and service users have moved from in-person
interactions to telephone, online and self-service.   
Coming out of the pandemic there were service introduction
meetings from September 2022 which looked at workforce planning
from a covid recovery perspective.  This introduced the Service re-
introduction toolkit.  Revised workforce plans were also approved at
Resource committees in September 2022 and the Council wide
workforce plan was reported to the Council Executive Committee in
November 2022. 
When re-introducing services, Resources were encouraged to make
full use of any advances in technology and new ways of working that
would improve service delivery for service users and customers – all
stakeholders and employees could benefit from new ways of
working. This was with the aim of developing a fully engaged,
healthier workforce. 
This has resulted in a range of flexible and agile working
arrangements being agreed, as per the service reintroduction toolkit,
including the ability to work from home, however there is no policy to
guide employees and managers, which has resulted in
inconsistencies in the operational application of these agreements. 
Some employees will have changed working hours and working
patterns within in their contracts, however, no contract states that
working from home as a condition. 
A key consideration during this process of reintroducing services was
ensuring that service users and customers would have has full
access to council personnel and services, as these activities
happened at the same time as there was easing of restrictions. 
Plans would be subject to regular review to ensure that they remain
fit for purpose, and they would be further adapted as necessary to
suit the future needs of the Council and its stakeholders. It is
essential that the Council ensures access to services for customers
and the community. 
No contracts of employment were changed and office locations as
per contracts remain the same. 
Linked to this review , it is important to ensure there is clarity on the
standard of service that we are providing to our communities. 
Alongside this review of Agile Working is a review of Corporate
Standards 
3. Identified Issues This approach is due for review since it was implemented in 2021.
There has also been some movement in use of building space. 
Inconsistencies have been identified in the approaches taken by
management. Without a defined policy, employees may be uncertain
around the basis and parameters for Agile Working therefore
guidance on Agile Working and clearly defined workstyles that
consider services, roles, and grades should be created to ensure
Council needs are being met and that approaches are consistent
across similar work areas or buildings, where it is appropriate to do
so. 
116

Page 117

It is important to ensure that access to services is not affected by any
working arrangements in place Therefore a major driver in the
requirement to conduct this review is to ensure the service provided
to our communities and visitors is not negatively impacted by agile
and/or flexible working arrangements. 
In addition, the Workforce Innovation - how councils are responding
to workforce challenges Best Value thematic work in South
Lanarkshire Council 2023-24 Report presented to the Risk and Audit
Scrutiny Committee on 25 June 2024 referenced that the Council will
undertake an exercise in this area. 
4. Identified Outcome(s)  To gather information on current agile working arrangements in place
and consider Agile working within South Lanarkshire Council . 
To ensure working arrangements within the Council are based on
service need. 
To introduce a transparent, fair, and consistent approach to the
operation of any flexible and agile working arrangements for any
posts identified as suitable for agile and/or flexible working. 
Consider how any agile or flexible working arrangement is managed
to ensure consistency across the Council. .   
Consider the impact of any Agile working arrangement on the need
for Property and Equipment (such as IT) 
Benefits for the Council of Agile Working Guidance (not exhaustive) 
Ensure needs of Council and stakeholders are met. 
Improved attraction and retention of staff.
Clarity on impact on estate costs and carbon impact 
Ensure access to customers and the community. 
Ensure corporate standards are being adhered to in all standards
internally and externally. 
Provide consistency for managers and employees  in the application
of any flexible or agile working arrangement . 
Benefits for employees of an Agile Working Policy (not exhaustive) 
Provide consistency for managers and employees  in the application
of any flexible or agile working arrangement 
Work life balance 
5. Scope of Review • There will be a review and verification exercise carried out of
current agile working arrangements.
• A template has been created to gather information on agile
arrangements.
• To create guidance standardising arrangements for agile
working
• To consult with the Trade Unions on proposals for
standardising arrangements
• To work with Buildings and IT to ensure adequate provision
of locations and equipment for any changes to current
arrangements.
• To implement the standardised arrangements 
117

Page 118

6. Resources affected: -
Community
and Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
7. Trade Union, Personnel Team, and Management Engagement 
Engagement is required with Trades Union Colleagues (providing TU and Employee
representation) the Personnel Team and representatives from management in each Resource
Elected Members
JTUC, JNCC
HR Managers
Executive Directors and Heads of Service
8. Key aims of/outcomes from project 
Service/operational To consider a transparent, fair, and consistent approach to the
agreement and operation of flexible and agile working arrangements
for any posts identified as suitable for agile and/or flexible working. 
Employee To ensure employees are provided with clear and consistent working
arrangements. 
Other Introducing Agile Working Guidance that will bring South Lanarkshire
Council in line with other local authorities and provide the
organisation and employees with the benefits detailed in section 2. 
9. Key milestones 
• 29 August – Initial report to CMT
• 30 August – 12 September, Review and Verification Exercise
• 24 October – Draft Agile Working Guidance Developed and Interim report to CMT with
update and recommendations
• 5 November – Planned JTUC meeting
• 5 November – 17 December – Trade Union Consultation 
• December 2024/ January 2025 – Final Report to CMT
• Performance Review and Scrutiny Forum – 19 November 2024
• Executive Committee for approval
10. Monitoring and reporting arrangements 
• Regular meetings with key stakeholders including Trade Unions
• Support for managers provided.
• Final report to CMT.   
11. CMT Sponsor / Lead Officer 
Michelle Milne, Head of Personnel
Jackie Taylor, Executive Director Finance and Corporate Resources
12. Project resourcing 
The project will require support from –
• Resources
• Personnel Services
• IT
• Asset Management 
Approved by:  Executive Director ………………………………………………   
Chief Executive ………………………………………………
Date:   ………………………………………………
118

Page 119

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 19 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Corporate Standards 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Performance Review and Scrutiny Forum with an overview of
the Council’s Corporate Standards and proposals to update the standards
and supporting documentation
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the review process and Terms of Reference are noted. 
3. Background
3.1. The current Corporate Standards were published in 2012 and are designed to
be the minimum standards expected to ensure a base level of consistency
across the Council.  The standards cover the areas of Council identity, conduct,
communication, and customer care. 
3.2. Since 2012, there have been changes in how the Council operates and delivers
it services.  In addition, there has been the normal turnover of employees since
the pandemic in 2020, where employees commenced employment during a
time of change.  This has led to some inconsistencies in practice related to the
application of corporate standards in call handling, responses to enquiries and
in email communications. 
3.3. It is important in terms of access to services and quality and standards for both
internal users and external service users and customers, to ensure that access
to services is not impacted as a result of any changes.  Therefore, a review of
the Corporate Standards is required. 
3.4 A Terms of Reference has been prepared and is available at Appendix 1. 
4. Considerations
4.1. The Covid-19 pandemic was instrumental in changing how the Council delivers
its services, and a gradual and planned reintroduction of service delivery has
taken place since recovery plans were launched in July 2021.    
9
119

Page 120

4.2. When re-introducing services, Resources were encouraged to make full use of
any advances in technology and new ways of working that would ensure service
delivery for customers was not negatively impacted, for example, when
attending meetings virtually, agile working, and for a range of other flexible
working arrangements. 
4.3. The move to more flexible working arrangements has also resulted in a change
in employees working patterns, it is therefore essential that the Corporate
Standards are reviewed and updated to reflect any changes.  Also, that all
employees and managers are aware of and adhere to the standards to ensure
efficient and effective service delivery is maintained with no negative impact on
customers and service users. 
5. Review Process
5.1. The Corporate Standards will be reviewed and updated in two stages. 
5.1.1. Stage 1: communications have been issued to employees and managers on
keys areas of the standards including the following: - 
• telephone communications standards
• email format and email signature standards 
• use of the ‘Out of Office Assistant’ standards
• the requirement for services to review contact information on the external
and internal websites for accuracy and that managers consider replacing
individual employees email addresses with shared mailbox contacts, and
individual employees phone numbers with telephone call groups, where
available and appropriate 
5.1.2. Stage 2: a full review of the Corporate Standards Handbook and supporting
documentation will take place.  It is planned this review will take place over the
rest of the calendar year with proposals for any amendments being made as
appropriate, in the first quarter of 2025.   
6. Employee Implications
6.1. There are no employee implications arising from this report. 
7. Financial Implications
7.1. There are no financial considerations contained within this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications
associated with this report. 
9. Other Implications
9.1. There is a risk of damage to the Council’s reputation if employees and services
are not easily contactable or there is inconsistency and a lack of adherence
with the Council’s Corporate Standards, which can have adverse effect on the
public perception of the Council. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. There is no requirement to carry out an integrated impact assessment in
relation to the proposals within this report.    
120

Page 121

10.2. Consultation will take place with Trade Unions as required during the process
of reviewing the standards, through the JTUC (Joint Trades Union Council),
JNCC (Joint Negotiating and Consultative Committee) and JCCs (Joint
Consultative Committees). 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information,
please contact:-
Michelle Milne, Head of Personnel Services
Ext:  4330  (Tel:  01698 454330)
E-mail:  michelle.milne@southlanarkshire.gov.uk@southlanarkshire.gov. 
121

Page 122

Appendix 1
Corporate Standards Review – Terms of Reference 
1 Review Title Corporate Standards
2 Background The current Corporate Standards were published in 
2012 and were designed to be the minimum standards
expected to ensure a base level of consistency across 
the Council.  The standards cover the areas of Council
identity, communication, conduct and customer care. 
Since publication of the Corporate Standards, there
have been changes in how the Council operates,
particularly as it has become more agile after 2020, the
current standards require a review to ensure the standards
are reflective of current Council practices, that employees
and managers know what is expected of them, and to
ensure there is consistency across the Council. 
There has been a greater scope for agile working through
the use of the Service Re-introduction toolkit in July 2021. 
This has led to inconsistencies in practice related to the
application of corporate standards in call handling,
responses to enquiries and in email communications.  It is
important in terms of access to services and quality and
standards to ensure that access to services is not impacted
as a result. 
2 Identified Issues  The current policy is 12 years old. 
There have been concerns and complaints from service
users, the public, internally from colleagues and service
areas and from elected members about their ability to speak
to or deal with staff directly on matters. 
Inconsistencies have been identified in the approaches 
taken by employees and management, to service 
provision and related communications. The standards 
covering the areas of Council identity, communication, 
conduct and customer care are not being applied as per the
current policy and do not represent the modern practices 
that have developed since 2012. 
It is essential to ensure that access to and support in
receiving services is not affected by any working
arrangements in place.  
Identified
Outcome(s) 
To review the Corporate Standards in 2 stages: 
Stage 1
• Initial progress will be made in reminding employees
and managers of the four areas of work in stage 1. 
122

Page 123

Stage 2
• The full Corporate Standards and all associated
documents will be reviewed and updated.  
This work will take place alongside the approach of
developing an Agile Working Guidance. 
The primary purpose of reviewing the Corporate Standards
and introducing Agile Working Guidance is to ensure
working arrangements within the Council are based on
service need and to ensure there is a consistent approach
being applied by all employees and managers in the
approach to meeting Corporate Standards.     
Benefits for the Council (not exhaustive)
Ensure needs of Council and stakeholders are met.
Ensure access for customers and the community. 
Ensure corporate standards are being adhered to in all
standards internally and externally.
Provide consistency for managers in the application of
corporate standards. 
Benefits for employees (not exhaustive)
Clearer guidance aligned to current working practices that
are clear and consistent for employees to follow and match
the current changed ways of working. 
This piece of work also relates to the work that is
commencing on Agile Working and the recent Audit by Audit
Scotland on Workforce Innovation - how councils are
responding to workforce challenges Best Value thematic
work in South Lanarkshire Council 2023-24 Report
presented to the Risk and Audit Scrutiny Committee on 25
June 2024, as part of this Audit, it is referenced that the
Council will undertake an exercise on work patterns to
understand what proportion of its workforce is in each
category.  Updating the Corporate Standards will ensure that
as well as the working arrangements of the workforce being
more understood and refined to more meet service need, the
Corporate Standards will support this in a better way.
3 Scope of Review To review the Corporate Standards in 2 stages: 
• Initial progress will be made in reminding employees
and managers of the four areas of work in stage 1.
• The full Corporate Standards and all associated
documents will be reviewed and updated. 
123

Page 124

Stage 1 - it is proposed that in September, guidance is
issued to employees on key areas of corporate standards,
namely:
(1) update and communicate the ‘Out of Office Assistant’
Corporate Standards contained in the current employee
guidance as detailed. This aspect of the standards is very
important in terms of service provision and access to
services for customers and services users of South
Lanarkshire Council. 
(2) services to carry out a review of their content on the
external South Lanarkshire Council website and the intranet
to check the accuracy of contact details and to ensure these
reflect the contact arrangements in place and ensure access
to services and service provision is not affected by any
working arrangements in place. Managers should also
consider replacing individual employees email addresses
with shared mailbox contacts, and individual employees
phone numbers with telephone call groups, where available
and appropriate. 
It is essential that a manned email box, and phone number
is provided on external websites and on internal contact
details. Arrangements should be put in place to ensure that if
an officer is not contactable, then an alternative contact is
easily identified and available 
(3) remind and reinforce the current email and email
signature standards. 
(4) remind and reinforce the current telephone
communication standards which are: All telephones must be
answered within 5 rings / 10 seconds. 
Reminders will be communicated through a personnel
circular, management bulletin and cascaded by Heads of
Service, with managers encouraged to conduct checks of
their own teams’ email signatures. 
Stage 2 would involve a full review of the Corporate
Standards Handbook and supporting documentation that will
run parallel to the work taking place at stage 1. It is planned
that this will be carried out over the rest of this calendar year
with an updated document brought back to CMT before the
end of December. 
Managers will be asked to conduct checks of their own
teams’ arrangements. 
124

Page 125

4 Resources affected: -
Community
and
Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
5. Trade Union, Personnel Team, and Management Engagement 
Engagement is required with Trades Union Colleagues (providing TU and Employee
representation) the Personnel Team and representatives from management in each
Resource.
Elected Members
JTUC, JNCC
HR Managers
Executive Directors and Heads of Service
Finance and Corporate Communications Team
Finance and Corporate IT Team
6 Key aims of/outcomes from project 
Service/operational To introduce an updated Corporate Standards Policy. 
Employee To ensure employees are provided with clear and consistent
guidance on corporate standards. 
Other Updating the Corporate Standards will bring the Policy up to
date.  
7 Key milestones 
• 29 August 2024– Initial report to CMT
• September / October 2024, Actions detailed at Stage 1 are implemented
• September to December 2024 – Review of the Corporate Standards Policy
• October and November 2024 – Trade Union Consultation 
• December 2024 – Update to CMT on progress and draft revised Policy
• Performance Review and Scrutiny Forum – 19 November 2024
8 Monitoring and reporting arrangements 
• Regular meetings with key stakeholders including Trade Unions
• Support for managers provided.
• Final report to CMT.  
9 CMT Sponsor / Lead Officer 
Michelle Milne, Head of Personnel
Jackie Taylor, Executive Director Finance and Corporate Resources
10 Project resourcing 
The project will require support from –
• Personnel Services
• IT
• Corporate Communications 
Approved by:  Executive Director ………………………………………………   
Chief Executive ………………………………………………
Date: 
125

Page 126