Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 03 August 2026 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 11 August 2026
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members
Maureen Devlin (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers,
Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross, Margaret B Walker 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Gavin Keatt, Eileen Logan
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
12 May 2026 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Consideration 
3 Council Plan Connect 2022 to 2027: Quarter 4 Progress Report 2025/2026
Report dated 2 July 2026 by the Chief Executive.  (Copy attached) 
7 - 56 
4 Self-Assessment and Improvement Activity Programme
Report dated 2 July 2026 by the Chief Executive.  (Copy attached) 
57 - 62 
5 Annual Performance Spotlights 2025/2026
Report dated 2 July 2026 by the Chief Executive.  (Copy attached) 
63 - 74 
6 Accounts Commission Audit of Best Value – Angus Council
Report dated 7 July 2026 by the Chief Executive.  (Copy attached) 
75 - 78 
7 Transformational Review Programme – Summary of Outcomes Report
2025/2026 and Future Pipeline
Report dated 7 July 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
79 - 96 
Urgent Business 
8 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370 089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 12 May 2026 
Chair:
Councillor Gerry Convery (Depute) 
Councillors Present:
Councillor John Anderson, Councillor Maureen Devlin, Councillor Katy Loudon, Councillor Davie
McLachlan, Councillor Kirsten Robb, Councillor John Ross 
Councillors' Apologies:
Councillor Maureen Chalmers, Councillor Joe Fagan (ex officio), Councillor Richard Lockhart 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy; L Marshall, Finance
Adviser; N Reid, Research and Improvement Manager
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development; K McGuire, Waste and Grounds
Strategic Manager; G Newbigging, Area Manager
Education Resources
J Wallace, Head of Education (Primary and Early Years)
Finance and Corporate Resources
J Taylor, Executive Director; K McLeod, Administration Assistant; T Slater, Administration Adviser
Health and Social Care/Social Work Resources
L Arthur, Interim Head of Health and Social Care (Social Care)
Housing and Technical Resources
H Phillips, Performance Co-ordinator 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Performance and Review Scrutiny Forum held on 24 March
2026 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Local Government Benchmarking Framework Overview Report 2024/2025 
A report dated 16 April 2026 by the Chief Executive was submitted providing a summary of the
key messages from the Local Government Benchmarking Framework (LGBF) overview report
published by the Local Government Improvement Service in March 2026.   
The 2024/2025 overview report was structured around the following themes:- 
 financial pressures
 workforce challenges
 health and social care pressures
2
3

Page 4

 education and young people
 tackling poverty
 performance of local government services 
A summary of the key messages contained in the 2024/2025 overview report was provided in
the Forum report and the full data set for the LGBF was available through the Improvement
Service’s ‘explore the data’ tool. 
The Forum decided: that the report be noted. 
4 Local Government Benchmarking Framework 2024/2025 Results and Action Plan 
A report dated 23 April 2026 by the Chief Executive was submitted on the Scottish Local
Government Benchmarking (LGBF) results for 2024/2025. 
The LGBF compared spend/cost, performance and customer satisfaction results over several
years and between similar councils.  It comprised a number of performance indicators across a
range of services. 
South Lanarkshire Council’s performance was summarised in table 1 of the report and further
information on the Council’s LGBF data and results for 2024/2025, together with comparative
data for 2023/2024 and 2022/2023, was provided in Appendix 1 to the report.  This information
also showed whether the Council’s performance in 2024/2025 had improved, remained the
same or declined compared to the previous year and how the Council’s performance compared
with the Scottish average. 
Family group analysis for indicators where the Council had lower performance than the Scottish
average, based on the 2024/2025 results, was provided in Appendix 2 to the report. 
Although the LGBF results were available for all councils in Scotland and could be used to
construct league tables, the Local Government Improvement Service (LGIS) cautioned against
this approach and emphasised that the purpose of the data was to open discussion about
performance and improvement in the context of specific services whilst taking account of
geography, demographics and local council priorities.  It was, therefore, important to pay
attention to the narrative against each indicator when forming a judgement on what the
performance meant in a South Lanarkshire context. 
At a local level, each council was required to publish its results at the same time as the
publication of the national results by the LGIS. 
The LGIS held benchmarking events where local authorities could share good practice. 
The Head of Communications and Strategy responded to a member’s question in relation to the
national survey capturing feedback from service users. 
The Forum decided: 
(1) that the importance of interpreting LGBF measures in the local context, as detailed in the
report, be noted; 
(2) that the results, narrative, actions and family group analysis included, following scrutiny of
the results for 2024/2025, be noted; and
4

Page 5

(3) that the arrangements of the publication of the Council’s results, in accordance with
statutory requirements, be noted. 
[Reference: Minutes of 1 April 2025 (Paragraph 3)] 
5 Accounts Commission Audit of Best Value – Aberdeenshire Council and Shetland
Islands Council 
A report dated 14 April 2026 by the Chief Executive was submitted on the key messages and
recommendations from recent reports published by the Accounts Commission on Best Value. 
Towards the end of 2023, the Accounts Commission introduced a new approach to the Audit of
Best Value to replace the Best Value Assurance Report (BVAR) arrangements which had run
from 2018 to 2023. 
The approach consisted of brief Controller of Audit (CoA) reports accompanied by, and
reflecting on, published annual audit reports.  The CoA reports were considered by the Accounts
Commission in public and reported publicly. 
Information was provided on the findings and key messages from recent CoA reports for
Aberdeenshire Council and Shetland Islands Council. 
The Forum decided: that the key messages and recommendations within the
Controller of Audit reports for Aberdeenshire Council and
Shetland Islands Council be noted. 
6 Transformational Reviews – Update 
A report dated 8 April 2026 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on the Transformational Reviews that were part of the Council’s
Transformational Change Programme for the year 2025/2026 and beyond. 
At its meeting on 26 June 2024, the Council’s Executive Committee noted the Transformational
Change Programme that was required to drive continuous improvement and efficiencies, and
link into the Budget Strategy over the next 3 years. 
Updates had been provided to previous meetings of the Forum.  This report provided a further
update on the following cross-cutting and Resource specific transformational reviews being
undertaken:- 
 Procurement
 Overtime
 Customer Engagement
 Digital Transformation
 Shared Services Review, which included:-
 IT Services and the Digital Office
 Personnel Services, Clyde Valley and Training
 Providing Print Services for Other Organisations
 Shared Services with Legal Services and Licensing and Registration
 Factoring
 Long-term Estate Strategy
5

Page 6

Savings identified from the reviews were outlined in section 7.1 of the report, which had been
included in the 2026/2027 savings proposals. 
To meet the continued challenges faced by the Council, a pipeline of activity was being
compiled to direct future review activity. 
The Forum decided: that the update on Transformational Reviews be noted. 
[Reference: Minutes of 24 February 2026 (Paragraph 5) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 9) and 5 November 2025 (Paragraph 9)] 
7 Urgent Business 
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 11 August 2026
Report by: Chief Executive  
Subject: Council Plan Connect 2022 to 2027: Quarter 4 Progress
Report 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Forum with the Council Plan Connect Quarter 4 Progress Report
2025/2026, for the period 1 April 2025 to 31 March 2026
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the Connect Quarter 4 Progress Report 2025/2026, summarised at
paragraph 4.5. and attached as Appendix 1 of this report, be noted;
(2) that the key achievements, as detailed at paragraph 4.6. of this report, be
noted;
(3) that the additional scrutiny of reporting measures that have changed status
between Quarter 2 and Quarter 4, as summarised in paragraph 4.7. and
detailed at Appendix 2 of this report, be noted; and
(4) that the Strategic subset of Local Government Benchmarking Framework
(LGBF) Results, as detailed at paragraph 5. and Appendix 3 of this report, be
noted. 
[1recs]
3. Background
3.1. The Council Plan Connect, covering the period 2022 to 2027, was approved by the
full Council on 15 June 2022.  A mid-term review of Connect was approved by the
Executive Committee on 30 April 2025. The Plan sets out the Council’s vision,
values, priorities and outcomes for the five-year period. 
3.2. As part of the performance reporting arrangements introduced in 2007, it was agreed
that progress reports on the Council Plan would be provided at the mid-year point
(Quarter 2) and at the end of the financial year (Quarter 4).  This report provides a
summary of progress on Connect as at the end of Quarter 4, 31 March 2026. 
4. Quarter 4 Progress 2025/2026
4.1. The Council Plan offers flexibility, both at the Resource level and from one year to
the next, in the choice of actions and measures required to deliver the Council’s
outcomes.  Alongside this flexibility, however, comes the requirement to ensure that
the golden thread from Council Plan to Resource Plan remains unbroken. 
4.2. The reporting framework for the Council Plan identifies key measures within
Resource Plans which are combined in a Connect report to provide a balanced
picture of council performance against Connect outcomes.  
3
7

Page 8

4.3. A total of 266 measures have been identified from the 2025/2026 Resource Plans. 
Of those, 64 (24%) have been nominated as key strategic measures for reporting
progress against Connect. 
4.4. Progress to date against these measures is contained in the Connect Quarter 4
Performance Report 2025/2026, attached as Appendix 1.  This report has been
produced from the Council’s performance management reporting system IMPROVe,
and uses a traffic light format with the following definitions to give a status report on
each measure: 
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when
available
Contextual Included for ‘information only’, to set performance information in
context 
4.5. To ensure adequate scrutiny of performance across all Resources, individual
Resource Committees receive details of all ‘red’ measures relating to that Resource
including management actions, where applicable. In addition, the Council’s
Performance and Review Scrutiny Forum may consider those measures across all
Resources reporting a ‘red’ and/or ‘amber’ status. 
The overall summary of Connect progress to date is as follows:     
Status Measures
Statistical  Project  Total %
Blue N/A 9 9 14%
Green  27 19 46 72%
Amber  3 3 6 9%
Red     2 0 2 3%
Report later/Contextual 1 0 1  2%
Totals  33 31 64 100%
Data as at 02 July 2026 
4.6. Progress and key achievements against each of the six Connect Outcomes for
2025/2026 have been summarised in the following tables: 
4.6.1.
Connect
Outcome
Communities and Environment 
Number of
measures
Blue Green Amber Red Report later Total
3 16 2 1 1 23
Achievements Lanarkshire Carers is the commissioned service offering support to adult carers
throughout South Lanarkshire. There are currently 8,700 carers known to the
organisation and approximately 1,000 new carers identified each year.  The
organisation has developed a customised digital portal for unpaid carers, called
8

Page 9

CarerSpace, offering a secure platform to document their caring experiences,
store important files, and communicate directly with Carer Support Workers. This
allows agencies to identify emerging issues before they become serious. (Social
Work Resources (SWR))
Care Day 2026 was marked through a large-scale event in Hamilton, bringing
together over 200 care experienced young people and staff from across South
Lanarkshire. The event was planned and delivered by the South Lanarkshire
Champions Board, demonstrating a strong commitment to ensuring that care
experienced young people are actively involved in shaping the services and
decisions that affect their lives. (SWR)
There was an increase of 11.61% of properties with full fibre connection during
2025/2026, bringing the percentage of properties up to 70.48%, compared with
the 2024/2025 figure of 58.87% (Community and Enterprise Resources (CER))
The percentage of streets found to be acceptable during Litter Monitoring
Systems Surveys carried out over 2025/2026 was 93.9%. This is better than the
annual target of 92% and is better than performance over the previous three
years. (CER)
The Waste Services review was completed and the percentage of household
waste sent to landfill in the calendar year January to December 2025 was
1.17%, well within the target to be below 5%. (CER)
Across our capital programme, the number of road safety schemes that have
been delivered exceeded the number scheduled with 112 schemes (87
carriageway/25 footway) completed. (CER)
The draft Local Transport Strategy (LTS) 2026-2036 was subject to a four-week
consultation period in November/December 2025 and was approved at
Community and Enterprise Committee in March 2026. The final document is now
being produced ready for publication on our website. (CER)
The new Hairmyres Transport Interchange, East Kilbride is complete. (CER)
We demonstrate strong leadership in climate and sustainability education
through large-scale learner engagement initiatives that amplify young people’s
voice and influence. In particular, the Conference of Schools (COS4) on Climate
Change and Sustainability, led by the South Lanarkshire Youth Forum on
Climate Change and Sustainability, brought together over 300 pupils and staff
from 100 primary schools at Hamilton Palace Sports Grounds. The event
showcased effective youth leadership in climate education and supported
schools to embed sustainability within learning. There was strong interest from
establishments in replicating the model, with continued support for future forums.
This work aligns closely with the Council’s commitment to empowering young
people, responding to the climate emergency and fostering responsible global
citizenship. (Education Resources (EDR))
A variety of engagement approaches have been undertaken to recruit and
increase participation in Stakeholder Groups. Community events, drop ins, and
community conversations have been facilitated in several neighbourhood
planning areas, bringing together residents and those delivering services, with
the aim of promoting awareness around what has been achieved through
neighbourhood planning to date and showcasing Participatory Budget funded
activities and the benefits projects bring. The Community Planning Website is
being used to highlight and promote the work and achievement of Stakeholder
Groups, raising awareness of what communities are achieving and highlighting
the variety of opportunities available to get involved. (Finance and Corporate
Resources (FCR)) 
9

Page 10

4.6.2.
Connect
Outcome
Education and Learning
Number of
measures
Blue Green Amber Red Report later Total
0 1 2 0 0 3
Achievements Education Resources continues to demonstrate sustained improvement in
attainment across literacy, numeracy and the senior phase, building on recovery
since the COVID‑19 pandemic while maintaining a strong focus on equity.
The 2025 data also highlights an increase in course presentations across the
senior phase, alongside growth in attainment of National Progression Awards
(NPAs) and Skills for Work qualifications, particularly for learners following
vocational and skills‑based pathways. Collectively, this demonstrates the success
of inclusive curriculum planning, high expectations for all learners, and a
continued commitment to recognising wider achievement aligned to individual
strengths, aspirations and future destinations. (EDR)
We continue to demonstrate strong performance in supporting young people to
achieve positive destinations and nationally recognised qualifications. The most
recent School Leaver Destination Report shows that 96.6% of pupils leaving
school in academic year 2024/2025 progressed to a positive destination. This
represents a continued improvement on the previous year and remains above
the national average of 95.7%. (EDR) 
4.6.3.
Connect
Outcome
Health and Wellbeing
Number of
measures
Blue Green Amber Red Report later Total
1 7 0 0 0 8
Achievements Guardianship Orders related to Adults with Incapacity (AWI) increased by 12%
from 2021/2022 to 2025/2026, with overtime helping to meet demand and aid
hospital discharge planning during winter. (SWR)
The Independent Living Fund (ILF) has also been used effectively to support
independent living. In 2024/2025, South Lanarkshire achieved 61% uptake,
performing above the national average, while in 2025/2026 all allocated awards
were fully utilised despite a reduced national allocation. This reflects effective
internal processes and strong local practice, delivering tangible benefits for
supported people and their carers. (SWR)
The Home Assessment Team (HAT) and Care at Home services continue to
support people to live well at home by promoting independence, self-care, and
self-management. In 2025/2026, both HAT and 3 Care at Home registered
services were inspected by the Care Inspectorate and achieved grades of 5 –
Very Good, providing independent assurance on the quality and consistency of
care. Inspectors highlighted strong staff teams, effective communication and
care delivered with dignity, respect, and compassion. (SWR)
Lanarkshire Carers is celebrating 30 years of Caring in Lanarkshire. During
Carers Week, June 2025, a range of activities were undertaken to raise
awareness to carers supports and services. South Lanarkshire University Health
and Social Care Partnership raised awareness to Carers Week (Caring in the
workplace) with the flag raising ceremony, information sessions for staff, and
publication of a carer’s information booklet.
Lanarkshire Carers continues to develop online tools to assist carers to think
about their caring situation. Lanarkshire Carers, Carer Connected
representatives, continue to share their lived experiences and assist services to
improve planning and delivery. They have visited the Scottish Parliament, heard
about Local Development Plans, and engaged with “No need to Fall” workshops.
(SWR) 
10

Page 11

The team at MAPPA (Multi Agency Public Protection Arrangements) Lanarkshire
won the title of Outstanding External Partner at the Police Scotland Lanarkshire
Excellence Awards. MAPPA Lanarkshire aims to minimise the potential risks
posed by serious violent and sexual offenders. To ensure the safety of the public
and reduce the risk of harm, MAPPA can use a variety of safeguarding
measures such as surveillance, curfews, electronic tagging, and sexual offence
prevention orders. MAPPA Lanarkshire is delivered through a partnership
between South and North Lanarkshire Councils and each MAPPA area works
with a number of different organisations including Police Scotland, the Scottish
Prison Service, and the NHS. (SWR)
The Decider Skills Groupwork Programme for men in South Lanarkshire Justice
Services was launched in July 2025 and groupwork is based on Cognitive
Behavioural Therapy and Dialectical Behavioural Therapy, to focus on mental
wellbeing and emotional regulation, enabling people to be more resilient,
resourceful, responsible, mindful of their actions and as such support the
development of more pro-social behaviours. This has been implemented within
the Hamilton/Blantyre team and to date 6 groups have commenced. There have
been 51 referrals in total with 32 people engaged and continuing to attend.
(SWR)
The £13m Transformation Fund is helping to modernise the leisure and culture
estate. Key projects completed include: 
- Gym and studio upgrades at Dollan Aqua Centre, Eastfield Lifestyles, Blantyre
Leisure Centre 
- Blackwood Community Wing, Willie Waddell, Coalburn 
- Toilet upgrade at Chatelherault Country Park 
- Roof replacement at Calderglen Country Park conservatory 
- Upgraded air conditioning system at Hamilton Water Palace
- Replacement changing pavilion at Priory (CER)
The roll out of the further expansion of free school meals for Primary 6 and
Primary 7 pupils in receipt of the Scottish Child Payment is complete. (CER)
107 new build homes were completed, all have been built to ‘Housing for
Varying Needs’ standards and are easily adaptable to accommodate the
changing needs of tenants over time. 15 of these homes (14%) to be fully
wheelchair accessible. 
Our affordable housing supply programme continues to increase the supply of
council homes across South Lanarkshire, with a focus on ensuring that the new
homes provide for changes in people’s need over time. (Housing and Technical
Resources (HTR))
Significant progress has also been made in building workforce capacity to
support early mental health and emotional wellbeing. By the end of May, a
further 148 early years staff will have been trained in the Infant Mental Health
(IMH) programme, with an additional training offer extended to 38 childminders.
(EDR)
Attendance Campaign – ‘Every School Day Matters’: A Council-wide campaign
launched to promote school attendance, especially among early years and
primary pupils. Featuring real pupils and superhero-themed messaging, the
campaign highlights the social and emotional benefits of regular attendance. It
aligns with national priorities and has been widely promoted across schools.
(EDR) 
11

Page 12

4.6.4.
Connect
Outcome
Children and Young People
Number of
measures
Blue Green Amber Red Report later Total
1 2 0 0 0 3
Achievements South Lanarkshire’s Family Support Hubs have received national recognition for
their impact in improving outcomes for children, young people and families,
having been shortlisted for the COSLA Excellence Awards 2025. (SWR)
Hillhouse Children’s House, managed by South Lanarkshire Council to support
looked after children and young people, has achieved ‘Very Good’ grades
following a recent inspection. The inspection recognised the strong, trusting
relationships between children and staff and highlighted the importance of these
relationships in helping children feel safe, respected and actively involved in
decisions about their care. (SWR)
All young people leaving care were provided with housing options advice and
support tailored to their individual needs and circumstances. This resulted in  
bespoke personal housing pathway plans being developed for each young
person. (HTR)
We continue to contribute to the reduction in child poverty within South
Lanarkshire. Increasing the council’s stock of larger properties has been a
particular focus for this with 48% of the new build properties completed in the
year being larger homes to accommodate families. In addition, 34% of the
existing homes purchased by the council to meet housing need were larger
again to accommodate families. (HTR)
Improving Attendance: Over 120 schools and Education Scotland
representatives attended the Curriculum and Quality Improvement Service
(CQIS) Attendance Conference, focused on tackling attendance through
collaboration and innovation. New South Lanarkshire Council attendance data
tools were launched, enabling real-time data use and reducing admin time.
These tools were rolled out authority-wide, supported by a comprehensive
learning programme. Our persistent absence level for session 2024/2025 was
3.1% compared to 3.8% nationally. (EDR)
Inclusion Conference 2025: Over 200 participants attended our “Embracing
Diversity” themed Inclusion Conference in September 2025. Topics covered
included a new vison for inclusive practice; embracing neurodiversity; embracing
all behaviour as communication; embracing equality and embracing The
Promise. (EDR) 
4.6.5.
Connect
Outcome
Housing and Land
Number of
measures
Blue Green Amber Red Report later Total
3 10 0 0 0 13
Achievements 243 additional homes were delivered during 2025/2026 and comprise 107 new
build units and 136 acquired through market purchase scheme. (HTR)
Average days to relet a home has decreased from 19.3 days in Quarter 4
(2024/2025) to 18.1 days in Quarter 4 (2025/2026). (HTR)
Ensuring those with the highest housing need are prioritised with 59.9% of lets to
urgent homeless (UH) households. (HTR) 
12

Page 13

4.6.6.
Connect
Outcome
Our Economy
Number of
measures
Blue Green Amber Red Report later Total
0 8 1 0 0 9
Achievements The number of participants supported via Council-operated employability
programmes during 2025/2026 was 2,415, with 745 gaining sustainable
employment and 801 participants accessing further education or training. (CER)
UK Government have confirmed the Levelling Up Fund (LUF) spend deadline
has been extended to 31 March 2028:
Clydesdale Way: Detailed design is in progress, building on the concept design
work previously undertaken. Stakeholder engagement sessions took place in
October 2025; landowner engagement is ongoing. 
Shawfield: The current anticipated completion date for all three LUF funded
Shawfield projects is late 2026. The Council has released £5,369,204 to date,
covering expenditure to the end of quarter one 2026/2027. (CER)
East Kilbride Masterplan project is progressing at pace with a number of parallel
workstreams being progressed and regular reports to committee on behalf of the
Project Board: demolition contractor appointed and on site; enabling works
commenced with new access routes fully in place; Planning Permission in
Principle approved; detailed design of Civic Heart element, including a new
Town Hall, progressing; and a two-stage design and build procurement route
being taken forward. (CER)
Hamilton Masterplan key milestones include: project managers appointed for
delivery of the Hamilton Masterplan; former Baird’s Department Store returned to
council ownership; New Cross Centre now vacant, and work ongoing towards
demolition and development proposals; demolition of former Vogue Bingo Hall;
and confirmation that the Pride in Place application for Hamilton Town Centre
has been successful and an award of up to £20m (Capital and Revenue) made
to support eligible activity. (CER) 
4.6.7 In addition to working towards the six Connect Outcomes, the Council will continually
aim to improve and ensure effective and efficient use of resources, and that business
will be conducted with integrity and transparency and will operate to the highest
standards.  In order to monitor and report progress against these values, Resource
outcomes have also been identified, under the heading Delivering the Plan and
achieving Best Value. Related achievements to date are summarised in the following
table:   
Delivering the Plan and Achieving Best Value 
Number of
measures
Blue Green Amber Red Report later Total
1 2 1 1 0 5
Achievements During 2025/2026, significant progress has been made in implementing
digital care systems to support modern, efficient and person-centred service
delivery across residential services. Person Centred Software (PCS) has
now been fully implemented across all three Council care homes and
Blantyre LIFE, providing staff with secure, real-time access to care plans,
risk assessments and daily records. This has improved continuity of care.
(SWR)
Following a successful pilot at David Walker Gardens, the Care Messenger
smart TV-based video calling and messaging system has now been rolled
out across all three Council care homes and Blantyre LIFE. Using familiar
technology, the platform supports simple video calls and messaging, helping
residents maintain meaningful connections, reduce digital exclusion and
contributing to reduced loneliness and improved wellbeing. (SWR) 
13

Page 14

The Digital Telecare Project has been formally signed off and closed. (FCR)
Education Resources has significantly refined its complaints handling
arrangements to ensure they are fully aligned with the Scottish Public
Services Ombudsman’s Child-Friendly Complaints Handling Principles and
the United Nations Convention on the Rights of the Child. These
refinements support earlier resolution, improve the quality and consistency
of responses, and reinforce a culture of listening, learning and
accountability. (EDR)
A set of audited Accounts has been produced and received a clean audit
certificate. These were approved for signature by the Risk and Audit
Scrutiny Committee by the submission date of 30 September 2025. (FCR) 
4.7. Scrutiny of Change in Measure Status 
A further analysis introduced to aid scrutiny of performance is to highlight and explain
all measures that have changed status from Quarter 2 to Quarter 4. On analysis of
these, four measures improved and five measures showed a decline in performance
- details of which are included at Appendix 2. The remaining measures under
scrutiny showed a change from Green/Report later to Blue (complete)/Green and
need no further action. 
5. Strategic Subset of Local Government Benchmarking Framework (LGBF) Results
5.1. As agreed at the Performance and Review Scrutiny Forum on 21 March 2023, this
report includes Appendix 3 which focuses on a subset of LGBF indicators aligned to
the outcomes in the Council Plan.  This provides an opportunity to review
benchmarking indicators which are of strategic importance to the Council and gives
insight into the Council’s performance over time as well as comparison with national
average. It should be noted that, while appendices 1 and 2 provide performance
information relating to 2025/2026, due to the lag in LGBF data being provided,
Appendix 3 relates to the period up to 2024/2025. 
5.2. As well as featuring in this report, LGBF indicators continue to be reported in full
annually to the Performance and Review Scrutiny Forum and included in the
council’s public performance reporting arrangements, published on the Council’s
website. 
6. Employee Implications
6.1. The outcomes noted within the Council Plan will inform the Resource Plans and in
turn the Performance Appraisal process for individual employees. 
7. Financial Implications
7.1. Provision for meeting the Council Plan’s outcomes is reflected in both the Revenue
and Capital budgets, and longer term, within the framework of the Council’s
approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications arising from
this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy. 
All Resource Plans have recognised sustainable development and climate change as
a key area of focus for 2025/2026.  
14

Page 15

9. Risk and Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
2 July 2026 
Link(s) to Council Values/Priorities/Outcomes 
The Council Plan 2022 to 2027 reflects the overarching vision of South Lanarkshire Council
and details its values, priorities and outcomes, including links to the Community Planning
Partnership. 
Previous References
 Performance and Review Scrutiny Forum (25 November 2025) - Council Plan Connect
2022 to 2027: Quarter 2 Progress Report 2025/2026
 South Lanarkshire Council (15 June 2022) – The Council Plan Connect 2022 to 2027
and the South Lanarkshire Community Plan 2022 to 2032 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tom Little, Head of Communications and Strategy
Extension: 4904  (Phone: 01698 454904)
E-mail: tom.little@southlanarkshire.gov.uk 
Performance: www.southlanarkshire.gov.uk/performance   
15

Page 16

16

Page 17

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 2 Jul 11:08
Quarter 4 : April 2025 - March 2026
(This represents the cumulative position to March 2026)
Performance Report 2025-26
South Lanarkshire Council
Connect
3
17

Page 18

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 2 Jul 11:08
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome / Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 10 1 1 1 13
Education and Learning 1 1 0 0 2
Health and Wellbeing 7 0 0 0 7
Children and Young People 1 0 0 0 1
Housing and Land 4 0 0 0 4
Our Economy 3 0 0 0 3
Delivering the plan and achieving best value 1 1 1 0 3
Total 27 3 2 1 33
Page 1
18

Page 19

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of road casualties in South
Lanarkshire during 2025
Provisional casualty figures are available for the 2025 calendar year,
when there were 286 casualties. Of these, there were six fatal
casualties, 107 serious casualties and 173 slight casualties. There were
no child fatal casualties, however 11 children seriously injured and 15
children slightly injured.
Compared with the 2024 calendar year, there were 378 casualties. Of
these, there were eight fatalities, 134 serious casualties and 236 slight
casualties. For children in 2024, there were no child fatal casualties,
eight children seriously injured and 37 children slightly injured.
These are provisional 2025 figures and amendments or additional
records may be added to the reported figures above.
Green 382 286 284 370 382
Percentage of household waste sent to
landfill in the calendar year 2025
This measure is reported per calendar year, and the latest figures
(1.17%) relate to the period from January to December 2025.
Performance for the year is well within target of 5%.
Green 5.00% 1.17% 1.84% 1.50% 1.32%
Evidence the use of recycled stock as a
percentage of all activity.
To date, there have been a total of 4,447 items issued, of which (20%)
885 were recycled.
In quarter 4, there was a total of 1,190 items, of which 22% (262) were
recycled.
The target of 10% has been achieved for the reporting period.
Green 10% 20% ------ 20% 22%
Percentage of properties with Superfast
Broadband >30Mbps
There has been a 0.52% increase in the percentage of properties with
Superfast Broadband compared to 2024-25, from 98.79% to 99.31%.
Government schemes are helping to connect the most remote properties
in South Lanarkshire.
Green 99.0% 99.3% 97.3% 97.9% 98.8%
Page 2
19

Page 20

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Land Audit Management System grounds
maintenance score
The Land Audit Management System (LAMS) score at quarter four was
72, equalling the annual target.
Green 72.0 72.0 72.0 72.0 72.0
Percentage of our road network that should
be considered for maintenance treatment
(Roads Condition Index).
This figure is derived from the The Scottish Collaboration of
Transportation Specialists (SCOTS) Road Condition Index (RCI) survey
which is undertaken each year.
The target of 32.5% for 2024-26 is based on the results for the period
2023-25.
The 2024–26 figure of 31.8% represents a 0.7% improvement across
our entire network based on the latest survey results and the sections of
road assessed. These results should be considered alongside previous
surveys to understand longer-term trends in road condition, particularly
as not all roads are surveyed each year.
Green 32.5% 31.8% 30.8% 31.9% 32.5%
Percentage of A class roads that should be
considered for maintenance treatment
(Roads Condition Index)
This figure is derived from The Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target of 27.7% for 2024-26 is based on the results for the period
2023-25.
The actual figure for 2024-26 of 26.6% indicates an improvement of
1.1% in our A class road network, based on the current survey results /
sections of roads survey.
Green 27.7% 26.6% 23.9% 24.9% 27.7%
Page 3
20

Page 21

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of B class roads that should be
considered for maintenance treatment
(Roads Condition Index)
This figure is derived from the Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target of 29.6% for 2024-26 is based on the results for the period
2023-25.
The actual figure for 2024-26 of 27.5% indicates an improvement of
2.1% in our B Class road network, based on the current survey results /
sections of roads survey.
Green 29.6% 27.5% 26.1% 27.8% 29.6%
Percentage of C class roads that should be
considered for maintenance treatment
(Roads Condition Index)
This figure is derived from the Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target of 37.4% for 2024-26 is based on the results for the period
2023-25.
The actual figure for 2024-26 of 34.5% indicates an improvement of
2.9% in our C Class road network, based on the current survey results /
sections of roads survey.
Green 37.4% 34.5% 35.6% 36.5% 37.4%
Page 4
21

Page 22

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of U class roads that should be
considered for maintenance treatment
(Roads Condition Index)
This figure is derived from The Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target of 32.4% for 2024-26 is based on the results for the period
2023-25.
The actual figure for 2024-26 of 32.9% indicates a slight regression of
0.5% in our Unclassified road network, based on the current survey
results and sections of roads surveyed.
Amber 32.4% 32.9% 31.6% 32.6% 32.4%
Broad compliance with food law statutory
requirements secured in premises
During 2025-26, 97% (2,769) of food businesses that have been
inspected were found to be broadly compliant with food law, food
hygiene and food standards legislation. This compliance figure
continues to exceed the annual target set for this measure.
Since the new food law rating scheme came into affect, local authorities
can focus resources on high risk and non-compliant businesses by
conducting more frequent inspections in these establishments.
Green 85.0% 97.0% 96.0% 95.0% 95.0%
Page 5
22

Page 23

IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Communities and Environment
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Reduce carbon emissions from council
services (buildings, waste, transport etc.)
The latest carbon figures are for 2024-25.
The Council’s carbon emissions totalled 46,730 tCO2e (tonnes of
carbon dioxide equivalent) in 2024-25. This is a 70% reduction from the
baseline year of 2005-06 and a reduction of 5% compared to 2023-24.
Carbon emissions figures for 2025-26 will be reported to the Climate
Change and Sustainability (CCS) Committee in November 2026.
Report Later ------ ------ ------ 9.46% 5.00%
Percentage of total household waste that is
recycled in the calendar year 2025
This measure is reported per calendar year, so the figure shown (40.63%)
relates to the period January to December 2025. The recycling rate is
lower than that reported for the same period in 2024 (41.83%). Chargeable
garden waste permits were introduced in April 2025 and one of the known
risks associated with the scheme was reduction in the amount of organic
waste collected for recycling (composting). However, the garden waste
permit scheme is just one factor affecting the recycling rate. Due to issues
with the council's bulky waste processing contractor, and through no fault
of the council, the service was required to put contingency disposal
arrangements in place to ensure continuity of service provision. In the
short term, the waste was disposed of to landfill until the Council could put
more sustainable contractual arrangements in place from 1 October 2025.
Red 50.00% 40.63% 41.20% 43.75% 41.80%
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of pupils entering positive
destinations (initial destinations)
The most recent School Leaver Destination Report (SLDR) showed that
96.6% of pupils who left school in academic year 2024/25 entered a
positive destination. This was a slight improvement from the previous
year and above the national rate which remained at 95.7%.
Green 97.0% 96.6% 96.2% 96.9% 96.4%
Percentage gap between pupils from the
least and most deprived areas entering
positive destinations
The gap between most and least deprived has increased to 3.7
percentage points from the previous year but remains lower than the
national gap of 4.8.
Amber 3.0% 3.7% 6.1% 2.9% 3.2%
Page 6
Education and Learning
23

Page 24

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of new build that are wheelchair
accessible (RP)
To date in 2025/26, 107 new homes have been completed by the
council. 14% of these are wheelchair accessible which accounts for 15
homes. Further wheelchair accessible council homes are currently under
construction, anticipated to be completed later in 2026/27.
Green 10.0% 14.0% ------ 19.2% 16.0%
Percentage of Justice Social Work reports
submitted to Court by the due date.
To date, 98% (1812 out of 1858) of Justice Social Work reports have
been submitted within timescale. In quarter 4, 98% (425 out of 433) of
Justice Social Work reports have been submitted within timescale this is
an increase from 97% in quarter 3.
Green 95.0% 98.0% 98.0% 98.0% 97.0%
Percentage of children and young people
attending primary school
While the current year position has not yet met the stretch target,
primary school attendance remains above the level achieved in earlier
years and shows a generally improving trend over the three-year period.
The target was set as an ambitious stretch aim to drive sustained
improvement and reduce inequalities, rather than represent a minimum
expectation. Ongoing focus on attendance, wellbeing and early
intervention continues to support positive underlying progress.  The
council-wide ‘Every School Day Matters’ attendance campaign has since
been launched to promote the importance of regular attendance.
Green 94.6% 93.7% 92.5% 92.9% 93.8%
Percentage of children and young people
attending secondary school
Secondary school attendance continues to improve compared with
previous years and remains stable in a challenging national context,
although the stretch target has not yet been achieved. As with other
wellbeing measures, the target was deliberately ambitious to promote
continuous improvement. Targeted actions to support engagement,
wellbeing and sustained attendance are contributing to positive
longer-term progress.  The council-wide ‘Every School Day Matters’
attendance campaign has since been launched to promote the
importance of regular attendance.
Green 93.0% 87.9% 87.2% 87.9% 88.3%
Percentage of reports submitted to the
Children’s Reporter within agreed
timescales.
To date 87% (240 out of 277) reports submitted to the Children's
Reporter within timescale. In quarter 4, 86% (56 out of 65) reports were
submitted within timescales. This is a decrease in performance from
92% in quarter 3.
Green 75.0% 87.0% 77.0% 53.0% 72.0%
Page 7
24

Page 25

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Health and Wellbeing
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of statutory supervising officer
visits completed within timescale for local
authority welfare guardianship orders.
To date, there was a total of 256 local authority guardianship visits due
with 90% (230) being completed in time, exceeding the target. In quarter
4, there was a total of 61 local authority welfare guardianship visits due
with 89% (54) being completed in time, exceeding the target of 75%.
Performance reports remain available to the teams providing current
performance levels.
Green 75% 90% 93% 94% 91%
Percentage of statutory supervising officer
visits completed within timescale for private
welfare guardianship orders.
To date, there was a total of 1,678 private guardianship visits due with
83% (1,394) being completed in time, exceeding the target. In quarter 4,
there was a total of 368 private guardianship visits due with 87% (319)
being completed in time, exceeding the target of 75%.
Performance reports remain available to the teams providing current
performance levels.
Green 75% 83% 93% 92% 87%
Children and Young People
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of care experienced children
and young people accommodated in
residential placements.
As at 31 March 2026, there were a total of 735 Looked After Children,
664 (90%) were looked after in a community setting and 71 (10%) were
looked after in a residential setting including local authority houses,
secure accommodation and residential schools, this position has been
maintained since 2021. This reflects South Lanarkshire’s commitment to
shift the way care is delivered to Looked After Children, with continued
support to children and young people within the community.
Green 10.0% 10.0% 10.0% 10.0% 10.0%
Page 8
25

Page 26

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Housing and Land
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
% of lets to Urgent homeless (UH)
households (RP)
Target achieved. Green 55.0% 59.9% 58.1% 62.9% 62.5%
% of new tenancies sustained for more
than a year for all lets (SSHC) (RP)
Tenancy sustainment has remained strong within quarter 4 and target
achieved.
Green 88.00% 91.60% 92.00% 92.20% 91.90%
% of Housing Options interventions where
Homelessness prevented (RP)
As at quarter 4, 1791 (75.9%) homeless cases prevented. Green 70.0% 75.9% 65.9% 60.8% 60.0%
% of response repairs completed on time Target achieved. Green 90.0% 95.2% 95.3% 97.0% 95.5%
Our Economy
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of participants supported via
council-operated employability
programmes
The target has been met and reflects ongoing high demand for
employability support.
Green 2,400 2,415 1,687 2,663 3,059
Number of participants accessing further
education or training
Target has been significantly exceeded.  This is in part due to the
successful delivery of the Employability Academy in partnership with
South Lanarkshire College which has delivered targeted learning
opportunities to participants.
Green 600 801 536 870 804
Number of participants gaining sustainable
employment
This target has been met, significant work has been undertaken with
local employers to progress employability participants into sustainable
employment.
Green 700 745 584 643 725
Page 9
26

Page 27

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Thursday 2 July 2026
Council Plan Performance Indicators
Delivering the plan and achieving best value
Performance Indicators Comments/ Progress Status 2023/24 2024/252022/23Target To Date
-------- Last 3 Years ------------------- This Year -----------
Customer Service Centre - % of calls
answered
Performance has been impacted by a range of factors. High staff
turnover, training commitments, absences, the implementation of new
systems, manual recording of information, and an increase in calls
following the garden waste permit renewal, annual council tax billing and
DHP renewals has resulted in performance being 4% below the target of
90%.
Customer Services continues to work with Personnel Services regarding
recruitment and in the management of absences. We continue to liaise
with Resources on training and support on new systems and processes.
Turnover has stabilised, absence levels have reduced, and more staff
are in post.
Amber 90.00% 86.00% 94.00% 91.00% 94.00%
Customer Service Centre – average queue
time (in seconds)
Performance has been impacted by a range of factors. High staff
turnover, training commitments, absences, the implementation of new
systems, manual recording of information, and an increase in calls
following the garden waste permit renewal, annual council tax billing and
DHP renewals has resulted in performance being below the target.
In addition, an increase in the call queue lengths has been trialled which
has also contributed to longer waiting times for some customers.
Customer Services continues to work with Personnel Services regarding
recruitment and in the management of absences. We continue to liaise
with Resources on training and support on new systems and processes.
Turnover has stabilised, absence levels have reduced, and more staff
are in post.
Red 250 358 134 252 187
Percentage of income due from Council
Tax received by the end of the year - in
year (incl water)
The annual Council Tax collection target for 2025-26 was set at 95.6%.
A Council Tax collection rate of 95.68% was achieved, ahead of target
by 0.08%.
Green 95.60% 95.68% 96.77% 95.70% 95.69%
Page 10
27

Page 28

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome / Theme Complete Green Amber Red Report later Total
Communities and Environment 3 6 1 0 0 10
Education and Learning 0 0 1 0 0 1
Health and Wellbeing 1 0 0 0 0 1
Children and Young People 1 1 0 0 0 2
Housing and Land 3 6 0 0 0 9
Our Economy 0 5 1 0 0 6
Delivering the plan and achieving best value 1 1 0 0 0 2
Total 9 19 3 0 0 31
Page 11
28

Page 29

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Community Safety
priorities are achieved
Continue to support the Safer South Lanarkshire Board and
work with partners to contribute to tackling identified
community safety issues
Safer South Lanarkshire Board has a focus on tackling identified
community safety issues and scrutinise local police and fire plans
which contributes to wider national community safety issues.  At the
meeting on 9 February 2026 the board consulted on the Scottish
Police Authority’s draft Strategic Policing Plan 2026 to 2029 public
consultation, and also an update on the multi-agency Bonfire Safety
Planning Group activities and the administration process for Firework
Control Zone applications.
Green
Take forward IT strategic
developments
Complete procurement exercise to identify partner to meet
SLC Digital Connectivity requirements, including improved
availability and affordability of broadband and 4G/5G mobile
services across the council area
Scope has increased to potentially include connectivity to social
housing. New business case being developed in conjunction with third
party.
Green
Lead by example and
influence area-wide
climate change and
sustainability action
Implement the Sustainable Development and Climate
Change Strategy (2022-2027) Action Plan, and report
progress at quarter two and quarter four to Climate Change
and Sustainability Committee
The Sustainable Development and Climate Change (SDCC) Strategy
and Action Plan continue to be delivered effectively, with the quarter
two update presented to the Climate Change and Sustainability (CCS)
Committee on 11 February 2026. Quarter four update on the 2025-26
Action Plan will be presented to CCS Committee on 17 June 2026.
The Sustainability team continue to work on the refresh of the Action
Plan for 2026-27, which was presented to CCS Committee for
approval on 29 April 2026.
Green
Page 12
29

Page 30

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
Submit annual Public
Bodies Climate Change
Duties (PBCCD) Report
to the Scottish
Government
Completion and submission of the PBCCD report by 30
November 2025
The annual Public Bodies Climate Change Duties compliance report
for 2024-25 has been completed. The report was presented at the
Climate Change and Sustainability Committee on 12 November 2025
for approval, before being submitted to the Scottish Government by
the 30 November deadline.
Complete
Deliver road and
transportation
infrastructure
improvements to
support new
developments, including
those undertaken as
part of the City Deal
Progress the Stewartfield Way Sustainable Transport
Capacity Enhancements Project in line with the agreed
programme
Project is progressing with early contractor involvement (ECI) and
contract preparation, tender and award, detailed design, various
assessments / investigations all underway. During 2027, we expect to
complete detailed design, prepare main construction contract tender
and award, complete Full Business Case (FBC).  Works expected to
commence in Spring 2028 progressing through to late Summer 2029.
Green
Launch and promote the
Local Transport Strategy
for South Lanarkshire
Launch and promote the new Local Transport Strategy to
Elected Members, partners and stakeholders by the end of
2025
The draft Local Transport Strategy (LTS) 2026-2036 was subject to a
four week consultation period in November/December 2025 and was
approved at Community and Enterprise Committee in March 2026. The
final document is now being produced ready for publication on the
Council website.
Green
Encourage greater use
of public transport by
working with partners to
improve public transport
Deliver prioritised improvements to bus and rail infrastructure
in line with available external funding for 2025-26
Lanark Interchange - A tender for the construction of a new bus station
area was issued in September 2025. A contractor has been appointed
and the project is progressing well, with completion expected by Q2
2026/27.
Green
Page 13
30

Page 31

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Communities and Environment
Action Measures Comments/ Progress Status
infrastructure Deliver and complete the park and ride infrastructure
associated with the new Hairmyres Transport Interchange by
September 2025
The new Hairmyres Transport Interchange, East Kilbride is complete,
including a new station building, north and south Park and Ride areas,
and footway works to connect to the wider footway network.
Offsite works including new pedestrian facilities on Eaglesham
Road/Strathnairn/St James Centre and new traffic signal-controlled
junction at Redwood Drive/Eaglesham Road and Greenhills Road also
complete with ongoing monitoring.
Complete
Ensure national
planning policy set out in
National Planning
Framework 4 in relation
to climate change,
biodiversity and
sustainable travel is
embedded in decision
making process for
planning applications
and the preparation of
the South Lanarkshire
Local Development Plan
3
Gather and assess data on these topics for inclusion in the
Evidence Report for LDP3 and to aid decision making. The
Evidence report to be presented to Full Council by
September 2025
The Evidence Report was presented to Executive Committee in
November 2025 and Full Council in December 2025, as required by
the Regulations. The Report was submitted to Scottish Ministers in
December 2025.
Complete
Preparation of South
Lanarkshire Local
Development Plan 3
(LDP3)
Start work on the proposed plan, anticipated adoption in late
2027, prepare the first phase Evidence Report and submit to
Scottish Ministers for Gatecheck by September 2025 and
continued engagement and consultation in accordance with
the Participation Statement in the Council's approved
Development Plan Scheme
Adoption of the Local Development Plan 3 (LDP3) is expected to take
place in quarter three 2028. The Evidence Report was presented to
the Executive Committee in November 2025, and Full Council
December 2025, as required by the Regulations. The Report was
submitted to Scottish Ministers December 2025.
Amber
Page 14
31

Page 32

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Education and Learning
Action Measures Comments/ Progress Status
Update PPRUDB
guidance and training
presentation to
incorporate updated
National Guidance
Revise and update the current PPRUDB guidance and
training presentation, in line with updated National Guidance,
to support safe and inclusive learning environments
The Framework is being updated at the moment and is in draft form.
Consultation with schools is planned for summer term so that the
updated guidance can be issued in August
Amber
Health and Wellbeing
Action Measures Comments/ Progress Status
Complete the roll out of
free school meals to all
primary children
Implement the roll out of further expansion of free school
meals to Primary 6 and primary 7 pupils in receipt of the
Scottish Child Payment from February 2025
The roll out of free school meals for Primary 6 and Primary 7 pupils
was completed during quarter one.
Complete
Page 15
32

Page 33

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Children and Young People
Action Measures Comments/ Progress Status
Focus on supporting
young people to
overcome any
disadvantage and take
forward our targets for
excellence and equity.
Locally identified stretch aims including Equity targets
focussed on the gap between learners in SIMD quintile 1 and
SIMD quintile 5 have been set, and we will report on
progress to the Education Resources Committee.
Targets agreed and set. Incorporated within Education Resource Plan
2025-25.
Green
Sustain early years
uptake for vulnerable
two-year-olds to provide
early access to quality
ELC whilst providing
families with flexible free
early learning and
childcare to support
return to work
Continue to engage with a range of partners to increase
uptake of eligible 2-year-old places, and report on progress
to Education Resources Committee.
The Early Learning and Childcare service continue to meet with Health
Visitors, Educational Psychologists, Social Work colleagues and a
range of professional agencies that support families to promote the
availability of 1140 hours free funded ELC for eligible children aged
2-3.  Three times per year we contact all families who are in receipt of
qualifying benefits, to advise them of their entitlement to 1140 free
funded hours, explaining how they can access this across South
Lanarkshire.
Our admission process also advises parents in low-income
households how they can claim exemption to nursery fees meaning
they too can access 1140 free funded ELC.
We continue to deliver high quality and flexible provision that supports
families to take part in training or seek employment.  Our ongoing
admission processes means that as soon as a child transitions from
the 2-3 age group to the 3-5 age group, we allocate the vacant place
to another 2 year old child within South Lanarkshire Council making
their funding available from the Monday following their birthday rather
than the term after their birthday allowing the earliest intervention to
take place for our children.
44.8% of all children (1347) aged 2-3 years accessing 1140 hours of
funded ELC, meet the eligibility criteria.
This equates to a 15.3% increase of children taking up their
Complete
Page 16
33

Page 34

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Children and Young People
Action Measures Comments/ Progress Status
entitlement during 2024-2025.
Housing and Land
Action Measures Comments/ Progress Status
Work with
Gypsy/Traveller
residents to develop and
implement a programme
of site improvement
Continue to deliver co-produced Site Masterplans at both
sites, reflecting council and resident priorities (RP)
Work ongoing to deliver the Gypsy / Traveller Site Masterplans, with
progress communicated through feedback from site managers, site
meetings at Shawlands Crescent.
A new schedule is in place to publish a newsletter for each site twice
each year.
Green
Ensure that Sheltered
housing services are
compliant with Care
Inspectorate Inspection
standards
Complete Quality assurance checks to monitor and ensure
compliance with care inspectorate standards (RP)
Quality Assurance continues to demonstrate high levels of compliance. Green
Work with partners to
bring Long Term empty
homes into use
20 empty homes to be brought back into use by March 2027
(RP)
A total of 66 empty homes were brought back into use between April
2025 and March 2026.
This includes 35 from the caseload managed by the Empty Homes
Officer, which is an increase of 7 compared to 2024/25.
Additionally, the council acquired 31 properties through the market
purchase scheme that had been empty for 6 months or more.
Complete
Page 17
34

Page 35

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Housing and Land
Action Measures Comments/ Progress Status
Ensure effective
involvement with tenants
and other customer
groups as well as
understanding our
customer satisfaction
Annual Scrutiny Programme 2025 developed June 2025 and
implemented by March 2026 (RP)
The two scrutiny exercises which formed the agreed programme for
2025/26, the Tenancy Sustainment Fund (TSF) and the role of the
Housing Officer in managing estates are both complete.  The
findings/recommendations from the TSF were presented to the Council
on 24 March 2026.  The report from the second exercise will be
completed in May 2026.
Green
levels of key service
areas
Customer Engagement Programme agreed with tenant
representatives by June 2026 (RP)
The annual Customer Engagement Programme was agreed with
members of the TPCG in August 2025 and includes involvement in:
Delivery of the scrutiny programme, rent setting, review of the
allocations policy and planning the delivery of the Customer Voices
Conference.
The next annual programme will be agreed with the TPCG in July
2026.
Complete
Delivery of the Rural
Action Plan maximising
existing and future
funding through
Community Led Local
Development and
Renewable Energy
Fund
Deliver the Rural Action Plan and report on progress to the
Rural Task Force in February 2026
A report on progress with the Rural Action Plan was taken to the
January 2026 Rural Task Force meeting. It was agreed this should be
reported annually after the financial year end, with the next report due
April 2027. The report highlighted grant awards made and progress
towards strategic targets.
Complete
Increase the number of
new affordable homes
Total new/additional affordable homes delivered per SHIP
and reported to Housing and Technical Resources
Committee (RP)
243 additional homes were delivered during 2025/26 and comprised of
107 new build units and 136 acquired through market purchase
scheme.
Green
Page 18
35

Page 36

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Housing and Land
Action Measures Comments/ Progress Status
Implement actions set
out in the Homelessness
Strategic Plan
Annual review to Housing and Technical Resources
Committee in June 2026 including 6 monthly update
reporting
Review complete and Homeless Strategic Plan was approved at
Housing and Technical Resource Committee in August 2025.
Green
Improve energy
efficiency of domestic
stock to help address
fuel poverty
Deliver Housing Investment Programmes to improve the
energy efficiency of existing council homes to reduce
household bills and contribute towards relevant net zero
targets
£32.338m refurbishment programme  works approved for 2025/26 of
which £9.779m is targeted towards energy efficiency works.
Programmes have been progressing with projects continuing into
2026/27.
Green
Page 19
36

Page 37

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Implement the delivery
of the approved East
Kilbride Town Centre
masterplan, working
through the agreed
project management
schedule to secure a
planned and managed
transfer of the town
centre and effective
delivery of the key
components of the
masterplan
Deliver the project management schedule, including seeking
approval from Planning Committee and completing the
design of Civic Hub and housing proposals within agreed
timescales
East Kilbride Masterplan project is progressing at pace with a number
of parallel workstreams being progressed and regular reports to
committee on behalf of the project board.
Demolition contractor, David Morton (Larbert Ltd), has been appointed
and on site since 19 January 2026, commencing soft strip and
disconnections in preparation for the full demolition. Enabling works
commenced with new access routes fully in place, design drawings for
Contractors Design Portion (CDP) items completed to reinstate the
staircase to allow full access to the shopping centre.
Planning Permission in Principle (PPIP) was approved in March 2026.
Detailed design of Civic Heart element including a new Town Hall is
progressing and a two-stage design and build procurement route is
being taken forward.  The residential layout and massing is in the final
stages and preferred procurement route being finalised. The overall
programme is still on track to be complete by the agreed timescale.
Green
Implement the delivery
of the approved
Hamilton Town Centre
masterplan and deliver
initial actions to enable
the delivery of key
projects
Deliver the agreed projects schedule to secure effective
delivery of the key components of the masterplan to help
secure change within agreed timescales
Following approval of £8m funding from the Council budget, a report
was presented to Community and Enterprise Resources Committee in
August 2025 providing an update on progress with the Hamilton
Masterplan and outlining the priorities.
Recent key milestones include:
Project Managers have been appointed for delivery of the Hamilton
Masterplan via HubSW and other disciplines including Civil Engineers,
Mechanical and Electrical Consultants, Property Agents are currently
being appointed.
Former Bairds Department Store returned to Council ownership in
March 2026.
Green
Page 20
37

Page 38

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
New Cross Centre is now vacant, and work is ongoing with the project
team to work towards demolition and thereafter will consider
development proposals.
The demolition of the former Vogue Bingo Hall on Keith Street has
been completed and the site advertised on the Council's Inward
Investment Site.
In December 2025, the Council received confirmation that the Pride in
Place application for Hamilton Town Centre had been successful and
an award of up to £20m (Capital and Revenue) has been made to
support eligible activity. A full report outlining Pride in Place was
presented to the Council’s Executive Committee on 4 February 2026.
The Chair of the Neighbourhood Board has been appointed, and
recruitment of members of the Board commenced.
Page 21
38

Page 39

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Promote sustainble
economic development
across South
Lanarkshire
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of the South Lanarkshire Economic Strategy (2022-2027)
Work on an updated Economic Strategy is underway and a suitable
committee to report to will be identified as work continues.
Green
Page 22
39

Page 40

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
Deliver the Levelling Up
Funded projects
Delivery of the Levelling Up Fund grant funded projects
through the Clydesdale Way and Shawfield Remediation,
£14.6m funding from 2025/26, completion in line with the
requirements set by the UK Government
UK Government have confirmed the Levelling Up Fund (LUF) spend
deadline has been extended to 31 March 2028.
Clydesdale Way - Detailed design is in progress, building on the
concept design work previously undertaken. Stakeholder engagement
sessions took place in October 2025, Landowner engagement is
ongoing. Final routes will be determined by cost, feasibility and
landowner consent. Works will be split into separate works packages
to be delivered by March 2028.
Shawfield: Clyde Gateway have extended the spend deadline to 31
March 2027 in line with UK Government guidance on flexibility.
Innovation Shawfield, industrial units on Southcroft Road are
complete, and the current anticipated completion date for all three LUF
funded Shawfield projects is late 2026. The Council has released
£5,369,204 to date, covering expenditure to the end of quarter one
2026-27.
UKG have released updated and streamlined reporting guidelines and
the new claims portal is anticipated to go live 13 April 2026.
Green
Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate,
whilst creating the right
conditions for low
carbon economic growth
Work with Business Gateway (BG) to deliver on the revised
Business Gateway delivery targets providing an annual
progress report to Community and Enterprise Committee
The report was presented to Community and Enterprise Resources
Committee in October 2025 and in March 2026.  These figures
demonstrate a significant upturn in performance in quarter four, but
also shows that the targets have not been met.
The latest figures highlight the ongoing uncertainty facing Scotland’s
SME base, with confidence remaining fragile and growth continuing to
weaken. A combination of structural pressures and wider economic
headwinds is constraining performance across the sector. Key
contributing factors include:
- Rising input, energy, and operational costs
Amber
Page 23
40

Page 41

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Our Economy
Action Measures Comments/ Progress Status
- Weak consumer demand and slowing economic momentum
- Global instability and international trade disruptions
- Inflation driven wage and cost pressures
- Persistent supply chain challenges and ongoing post Brexit
adjustments
We are continuing to embed the services of the Business Gateway into
the business facing services that South Lanarkshire deliver, for
example Planning, and Environmental Health.
In addition to this, we will be offering in 2026-27 a more generous suite
of business support grants that will increase referrals to the Business
Gateway.
Deliver effective
Employability Services
to support individuals
and business
Monitor and adjust the delivery plan agreed via the South
Lanarkshire Local Employability Partnership (SLLEP) and
Community Planning Partners
The Local Employability Partnership meets on a regular basis to
review progress against the Annual Investment Plan, ensuring that
priorities remain aligned with local needs. These meetings also provide
an opportunity for partners to share updates on programme delivery,
discuss any challenges or emerging issues, and monitor the status of
current funding streams. This collaborative approach helps maintain
effective coordination across services and supports continuous
improvement in employability provision.
Green
Page 24
41

Page 42

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 2 July 2026
Council Plan actions and measures
Delivering the plan and achieving best value
Action Measures Comments/ Progress Status
Increase routes for
communities to
participate in decision
making and priority
setting
Develop new Community Engagement and Participation
Strategy 2026-2031
Work in progress with Community Planning Partners. Green
Lead on strategic
planning
Develop a mid-term review of the Council Plan, Connect for
consideration by Elected Members in April 2025.
The mid-term review of Connect was approved at Executive
Committee on 30 April 2025 and is available on the council website.
Complete
Page 25
42

Page 43

Appendix 2
Connect: Quarter 2 to Quarter 4 2025-2026 - scrutiny of change in measure status 
Measure Q2 Status Q4 Status Q4 Comments 
Performance has improved from Q2 to Q4
Number of participants
supported via council-
operated employability
programmes 
Amber  Green The target has been met and reflects ongoing
high demand for employability support.
Number of participants
gaining sustainable
employment 
Amber  Green This target has been met, significant work has
been undertaken with local employers to
progress employability participants into
sustainable employment.
Ensure national
planning policy set out
in National Planning
Framework 4 in
relation to climate
change, biodiversity
and sustainable travel
is embedded in
decision making
process for planning
applications and the
preparation of the
South Lanarkshire
Local Development
Plan 3 (CER)
Amber Blue The Evidence Report was presented to
Executive Committee in November 2025 and
Full Council in December 2025, as required by
the Regulations. The Report was submitted to
Scottish Ministers in December 2025.
Prepare an annual
progress report for
Community and
Enterprise Resources
Committee,
demonstrating the
impact of the South
Lanarkshire Economic
Strategy (2022-2027)
Amber Green Work on an updated Economic Strategy is
underway and a suitable committee to report
to will be identified as work continues. 
Performance has declined from Q2 to Q4
Percentage of U class
roads that should be
considered for
maintenance treatment
– Roads Condition
Index (CER)
Report
Later
Amber This figure is derived from the Society of
Chief Officers of Transportation in Scotland
(SCOTS) Road Condition Index (RCI) survey
which is undertaken each year. The target of
32.4% for 2024-26 is based on the results for
the period 2023-25. The actual figure for
2024-26 of 32.9% indicates a slight
regression of 0.5% in our Unclassified road
network, based on the current survey results
and sections of roads surveyed.
3
43

Page 44

Measure Q2 Status Q4 Status Q4 Comments
Percentage of total
household waste that
is recycled in the
calendar year 2026
(CER)
Amber Red This measure is reported per calendar year,
so the figure shown (40.63%) relates to the
period January to December 2025. The
recycling rate is lower than that reported for
the same period in 2024 (41.83%).
Chargeable garden waste permits were
introduced in April 2025 and one of the
known risks associated with the scheme was
reduction in the amount of organic waste
collected for recycling (composting).
However, the garden waste permit scheme is
just one factor affecting the recycling rate. In
June 2025, issues with the council's bulky
waste treatment contractor meant that waste
that had been previously recycled needed to
be sent to landfill until a new contract was
awarded. The new contract commenced on 1
October 2025 and the service continues to
monitor the contract performance and its
impact on waste statistics.
Customer Service
Centre - average
queue time (in
seconds) (FCR)
Amber Red Performance has been impacted by a range
of factors. High staff turnover, training
commitments, absences, the implementation
of new systems, manual recording of
information, and an increase in calls following
the garden waste permit renewal, annual
council tax billing and DHP renewals has
resulted in performance being 4% below the
target of 90%. Customer Services continues
to work with Personnel Services regarding
recruitment and in the management of
absences. We continue to liaise with
Resources on training and support on new
systems and processes. Turnover has
stabilised, absence levels have reduced, and
more staff are in post.
Within the customer contact centre we have
been trialling an increase in the queue
lengths which has resulted in longer waiting
times.
Work with Business
Gateway (BG) to
deliver on the revised
Business Gateway
delivery targets
providing an annual
progress report to
Community and
Enterprise Committee
in August 2025
Green Amber The report was presented to Community and
Enterprise Resources Committee in October
2025 and in March 2026. These figures
demonstrate a significant upturn in
performance in quarter four, but also shows
that the targets have not been met. The latest
figures highlight the ongoing uncertainty
facing Scotland’s SME base, with confidence
remaining fragile and growth continuing to
weaken. A combination of structural
pressures and wider economic headwinds is
constraining performance across the sector.
Key contributing factors include:
-Rising input, energy, and operational costs
44

Page 45

Measure Q2 Status Q4 Status Q4 Comments
- Weak consumer demand and slowing
economic momentum
- Global instability and international trade
disruptions
- Inflation driven wage and cost pressures
- Persistent supply chain challenges and
ongoing post Brexit adjustments. 
We continue to embed the services of the
Business Gateway into the business facing
services that South Lanarkshire deliver, for
example Planning, and Environmental
Health. In addition to this, in 2026-27 we will
be offering a more generous suite of
business support grants that will increase
referrals to the Business Gateway.
Percentage gap
between pupils from
the least and most
deprived areas
entering positive
destinations
Report
later
Amber The gap between pupils from the most and
least deprived areas entering positive
destinations has increased from the previous
year to 3.7 percentage points but remains
lower than the national gap of 4.8. 
45

Page 46

46

Page 47

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Communities and Environment C&L05a Percentage of adults
satisfied with libraries
66.30% 69.00% 68.70% 65.30% There has been a very small decrease (less than 1%) in the
percentage of adults satisfied with libraries in 2024/25 in
comparison with 2023/24; the percentage remains well above
(better than) the Scottish average, and above the average for the
‘family grouping’.
Residents completing the household survey may not be users of
our services and are giving a perceived view, rather than based
on actual experience.
SLLC conducted a customer satisfaction survey throughout
2024/25 to assess actual service delivery and concluded an
overall satisfaction rate of 94% (combined score for value for
money / cleanliness / quality of services and equipment).
Customers have consistently rated library services highly.
C&L05c Percentage of adults
satisfied with museums
and galleries
66.30% 70.70% 70.00% 67.00% There was a very small drop in satisfaction with museums and
galleries in 2024/25, when compared with 2023/24; however the
percentage remains above (better than) the Scottish average
and above the average for the ‘family grouping’.
Residents completing the household survey may not be users of
our services and are giving a perceived view, rather than based
on actual experience.
SLLC conducted a customer satisfaction survey throughout
2024/25 to assess actual service delivery and concluded an
overall satisfaction rate of 94% (combined score for value for
money / cleanliness / quality of services and equipment).
Customers have consistently rated our museum services highly
for several years.
C&L05d Percentage of adults
satisfied with leisure
facilities
69.70% 66.70% 66.30% 65.00% There has been a very small reduction in the percentage of
adults satisfied with leisure facilities in comparison with 2023/24;
however South Lanarkshire remains above (better than) the
Scottish average, and 6.5% above the average for the ‘family
grouping’.
Residents completing the household survey may not be users of
our services and are giving a perceived view, rather than based
3
47

Page 48

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
on actual experience.
SLLC conducted a customer satisfaction survey throughout
2024/25 to assess actual service delivery and concluded an
overall satisfaction rate of 94% with our leisure facilities
(combined score for value for money / cleanliness / quality of
services and equipment).  Customers have consistently rated our
leisure services highly for several years.
ENV03c Street cleanliness score 92.30% 91.60% 92.90% 91.70% The South Lanarkshire street cleanliness score in 2024/25 is
higher than (better than) the 2023/24 figure and the Scottish
average for 2024/25.
This can be attributed to the implementation of the Litter
Strategy.
ENV04b Percentage of A Class
roads that should be
considered for
maintenance treatment
23.9% 24.9% 27.7% 31.0% There has been a significant decline in the condition of A-class
roads in South Lanarkshire.
Previous high levels of construction inflation reduced the length
of road network that can be resurfaced / repaired on an annual
basis – however it is anticipated that the combination of
sustained investment and effective asset management will lead
to stabilisation of our road network, with a modest yet steady
improvement achievable in the years ahead.
It should be noted the condition of the A Class network in South
Lanarkshire remains lower (better than) the Scottish average.
ENV04c Percentage of B Class
roads that should be
considered for
maintenance treatment
26.1% 27.8% 29.6% 35.0% There has been regression in the condition of B class roads in
South Lanarkshire; however their condition remains substantially
better than the Scottish average.
Previous high levels of construction inflation reduced the length
of road network that can be resurfaced / repaired on an annual
basis – however it is anticipated that the combination of
sustained investment and effective asset management will lead
to stabilisation of our road network, with a modest yet steady
improvement achievable in the years ahead.
ENV04d Percentage of C Class
roads that should be
considered for
maintenance treatment
35.6% 36.5% 37.4% 34.0% The C class road network is fully surveyed every four years and
during the survey period 2023/25 we observed a regression in its
condition compared to the previous year; and the condition falls
below (worse than) the Scottish average.
48

Page 49

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
The road surfacing decision making process in South
Lanarkshire takes account of road category and as a result a
greater level of investment is targeted towards our more strategic
road network (A Class). Previous high levels of construction
inflation also reduced the length that can be resurfaced /
repaired on an annual basis – however it is anticipated that the
combination of sustained investment and effective asset
management will lead to stabilisation of our road network, with a
modest yet steady improvement achievable in the years ahead.
ENV04e Percentage of U
(unclassified) roads that
should be considered
for maintenance
treatment
31.60% 32.60% 32.40% 36.00% Unclassified roads make up a sizeable proportion of the road
network in South Lanarkshire.
In 2024/25, it is noted that there has been a slight
improvement/stabilisation in condition and it is considerably
higher than the Scottish average.
ENV06 The percentage of total
household waste arising
that is recycled
41.10% 41.00% 40.70% 44.30% The percentage of total household waste that was recycled
decreased slightly in 2024/25 when compared with 2023/24 and
remains below (worse than) the Scottish average.
Multi-occupancy properties (flatted developments) make up over
30% of housing stock in South Lanarkshire. The lack of space at
these properties means opportunities to provide recycling
services are limited. Moreover, when recycling bins are provided,
often the only option is to provide large communal bins, where
contamination rates are significantly higher.
South Lanarkshire is one of the few councils to still provide a
fortnightly residual waste collection, meaning residents have a
minimum of 120L of residual waste capacity each week. It is
understood that recycling rates are lower when households
receive more residual waste capacity.
Waste Services are working closely with colleagues in Housing
Services with regard to improving our recycling figures. Through
additional funding we procured additional communal recycling
bin with Perspex sides, which allows residents to see the waste
streams and hopefully encourages greater participation. We
49

Page 50

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
have secured additional funding through Extended Producer
Responsibility (EPR) monies, and an extra 182 perspex sided
bins will be procured which will then be rolled out to more flatted
properties. Where we have contamination issues,
communications are being carried out in partnership with
Housing colleagues to discourage and advise on the correct
means of waste disposal.
CLIM02 CO2 Emissions area
wide: emissions within
scope of Local Authority
(LA) per Capita
3.26 3.04 ------ ------ Data not yet available
Education and Learning CHN04 Percentage of pupils
gaining 5+ awards at
level 5
70.0% 70.0% 71.0% 69.0% SLC improved slightly between 2023/24 and 2024/25 and
continues to perform above both the Family Group average and
the national figure. This sustained performance reflects our
ongoing focus on high quality learning, teaching and
assessment, supported by continuous self evaluation and
system wide improvement planning aimed at raising standards in
literacy and numeracy across all secondary schools.
CHN11 Percentage of pupils
entering positive
destinations
96.9% 96.4% 96.6% 95.7% SLC performance increased slightly in 2024/25. While this
remains above the national figure, SLC is marginally below the
Family Group average. This strong and stable level of
performance sits alongside ongoing work to strengthen skills for
learning, life and work, including enhanced partnership working
and a continued focus on supporting young people to make
successful transitions beyond school.
CHN14a Literacy attainment gap
P1,4,7 combined - %
point gap between the
least deprived and most
deprived pupils
22.30% 21.80% 19.80% 19.40% The poverty related literacy gap narrowed further and is close to
the national level; SAC funded approaches and data informed
targeting are supporting continued improvement along with work
to strengthen teachers’ understanding of CfE achievement data.
CHN14b Numeracy attainment
gap P1,4,7 combined -
% point gap between
the least deprived and
most deprived pupils
17.70% 17.40% 17.70% 16.60% The numeracy gap is broadly unchanged and slightly wider than
the national average; we are intensifying targeted numeracy
support and tracking to accelerate closing the gap.
CHN19b School attendance rate -
looked after children
83.20% 84.40% ------ ------ Data not yet available
Health and Wellbeing SW01 Home Care costs per £31.52 £38.47 £35.48 £32.54 In 2024–25, the hourly cost of providing care at home to
50

Page 51

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
hour for people aged 65
or over
individuals aged 65 and over in South Lanarkshire decreased.
Whilst it remains above the national average ranking adjusted
from 16 to 17.  These figures reflect the wide range of services
included in Home Care provision, which covers support delivered
by council staff as well as services purchased from other
councils, private providers, and voluntary organisations.
Care costs vary across Scotland, with weekly costs among South
Lanarkshire’s peer councils differing by over £30 per hour
between the lowest and highest costing areas. The costs
associated with South Lanarkshire’s Care at Home services are
influenced by the 2022/23 job evaluation for frontline staff. This
evaluation has led to increased spending due to higher frontline
salaries, while also improving service quality and inspection
grades.
Conversely, payments to other providers are lower, impacted by
factors such as inflation, rising living costs, and adjustments to
the living wage which creates sustainability challenges. The
Procured Services Arrangement (PSA), introduced in July 2024,
has had an impact in reducing the commissioning of
unnecessary hours and focusing enhanced rates in rural and
hard-to-reach areas.
Action: Levels of efficiency and performance of intermediate care
and care at home services are scrutinised weekly by senior
managers and at the Joint Locality Quarterly Performance
Review.
Expected to Improve? Whilst efficiencies in service continue to
be achieved, in terms of LGBF comparators, South Lanarkshire
costs are likely to remain higher than other council areas as a
result of the job evaluation and increases in inflation, cost of
living, and the living wage.
SW05 Residential cost per
week per resident for
people aged 65 or over
£736.00 £742.00 £676.00 £732.00 South Lanarkshire’s average weekly cost of providing residential
care for older people decreased in 2024–25 and is now below
the national average. South Lanarkshire’s position compared
with other councils has remained variable moving from 19 to 13
ranking.
Care costs vary widely across Scotland. This is because each
area has different levels of need, different local demographics,
and different contributions made by people who use services all
51

Page 52

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
of which influence performance. Within South Lanarkshire’s
comparison group of similar councils, the weekly cost of
residential care for people aged 65 and over can differ by more
than £500 between the lowest and highest cost areas. National
increases to the care home rate also influence results.
Action: Due to the variability of this measure, there are no
specific actions that will be taken to impact on costs.
Expected to improve? Local demographics and contributions will
determine future movement and ranking.
SW06 Rate of readmissions to
hospital within 28 days
per 1,000 discharges
99.90 95.60 98.00 102.80 South Lanarkshire’s rate of hospital readmissions has risen
slightly in 2024–25, compared with the previous year and ranking
shifted from 13 to 18. Readmissions may be for a variety of
reasons with a frail and older population, however, despite this
increase, South Lanarkshire continues to perform better than the
national benchmark and family group comparator average.
Performance across the six priority areas of the Health and
Social Care Delivery Plan is monitored monthly and formally
reported each quarter to the Social Work Committee and the
Integration Joint Board.
The Hospital Social Work teams work alongside clinical
colleagues to support a safe and timely discharge planning
process, ensuring people are given the support that they need
on discharge. The intermediate care unit within Blantyre Life
plays a key role in supporting recovery and improving patient
flow as a step down option. Whilst Home Assessment Teams
offer support to people within their own home, offering short term
reablement support to regain independence over a six week
period and enabling safe discharge from hospital.
Action: Hospital Social Work teams will continue to support the
discharge planning processes, whilst local community services
will work with acute sites to maintain capacity and support flow.
Expected to improve? Yes, however wider pressures, most
notably in relation to workforce supply and the financial
challenges facing social care, will continue to be influential.
SW08 Number of days people
spend in hospital when
they are ready to be
discharged, per 1,000
1,005.00 931.00 988.00 899.00 In 2024–25, the average number of days people in South
Lanarkshire spent in hospital when they were ready to be
discharged increased and ranking shifted from 19 to 22.
Although the national figure also increased, South Lanarkshire
52

Page 53

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
population (75+) remains above the Scottish average.
Steps have been taken to improve discharge planning, including
a successful pilot in the Frailty Assessment Unit (FAU) at
University Hospital Hairmyres, which will be extended to
University Hospital Wishaw.  Staff continue efforts to reduce
discharge cancellations and promote adherence to agreed
discharge planning processes to help reduce loss of capacity
within the system.
Action: Hospital Social Work teams will continue to support the
discharge planning processes, whilst local community services
will work with acute sites to maintain capacity and support flow.
Expected to improve? Yes. To improve patient flow across
Lanarkshire hospital sites, the Hospital Social Work team will
support acute staff with early identification of patients within
frailty units who are assessed as requiring support for discharge.
However other factors including patient demographics and
clinical decision making will also influence performance, along
with other pressures including the financial challenges facing
social care.
Children and Young People CHN08a The gross cost of
"Children Looked After"
in residential based
services per child per
week
£4,477.00 £5,159.00 ------ ------ Data not yet available
CHN08b The gross cost of
"Children Looked After"
in a community setting
per child per week
£360.00 £404.00 ------ ------ Data not yet available
CHN09 Percentage of children
being looked after in the
community
89.50% 90.00% ------ ------ Data not yet available
CHN17 % of children meeting
developmental
milestones
81.90% 82.70% ------ ------ Data not yet available
CHN23 % Looked After Children
(LAC) with more than 1
placement in the last
year (Aug-July)
13.90% 15.10% ------ ------ Data not yet available
53

Page 54

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
CHN24 Percentage of children
living in poverty (After
Housing Costs)
23.6% 19.5% 12.8% 14.8% The figures included as a source for this measure are different
from previous years, and use an alternative methodology to
calculate the percentage of children living in relative poverty -
defined as Children Living in Relative Low Income Families (After
Housing Costs). The data source that had been used previously
to report for the LGBF to represent child poverty were unofficial,
produced by Loughborough University on behalf of the End Child
Poverty Coalition/ Child Poverty Action Group, and showed a
higher figure for FYE 2024   e.g. South Lanarkshire= 19.5%/
Scotland= 23%. Statistics from this source have been
discontinued after FYE 2024.
The new ONS data (distributed through DWP Stat Xplore) will be
regarded as the source figures to represent the level of relative
child poverty (After Housing Costs) by the UK and Scottish
Governments going forward, instead of the ECPC/ CPAG data.
Although the new ONS figures are lower than the ECPC/ CPAG
2024 data used to report for this measure back in March 2025,
both sets of statistics confirm the continuation of the same
overall trend, that of a declining percentage of children living in
relative poverty (After Housing Costs) over the past 2 years, and
confirm that the South Lanarkshire rate for relative child poverty
continues to run below the Scottish average.
Housing and Land HSN01b Gross rent arrears (all
tenants) as at 31 March,
as a percentage of rent
due for the reporting
year
8.70% 8.00% 7.10% 8.60% Resource target achieved and significantly lower than Scottish
average.
The strong performance has been secured despite the financial
pressures which tenants continue to face due to the economic
situation.
A range of supports measures continue to assist tenants facing
financial hardship. The Council continues to set affordable rents
and provide advice.
Performance continues to be routinely monitored with a focus on
continuous improvement.
HSN02 Percentage of rent due
in the year that was lost
due to voids
0.60% 0.50% 0.40% 1.70% Performance this year has improved compared to the previous
two years. The Resource continues to focus on void
management to minimise void rent loss with a number of
improvement actions identified.
54

Page 55

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Performance in this area has been consistently among the best
in Scotland compared to other Local Authorities. In the past three
years we have been the second lowest void rent loss and well
below the Scottish average.
HSN04b Average number of days
taken to complete non
emergency repairs
11.60 days 14.50 days 13.00 days 10.10 days Performance in this area has improved and although above the
Scottish average, this is viewed positively because it is based on
an appointment-based system that is supported by tenants and
tenants’ representatives.
Improvement activity within the repairs service continues in
2025-26 to support the reduction of the average time taken
although the councils focus will continue to be on quality rather
than speed of service.
HSN05a Percentage of council
dwellings that are
energy efficient
------ ------ 0.00% ------ Measure suspended as government reviews standards.
The 2025 and 2032 EESSH Milestones have been suspended as
the Scottish Government are reviewing the EESSH2 standards to
strengthen and realign the standard with the target for net zero
heat in houses from 2045.
Our Economy ECON01 Percentage of
unemployed people
assisted into work from
council funded/operated
employability
programmes
12.90% 11.30% 13.40% 20.60% South Lanarkshire has achieved a year-on-year increase in the
percentage of unemployed people assisted into work from
council funded/operated employability programmes; however, it
is noted that the Scottish average has increased significantly and
as a result, the South Lanarkshire figure is lower than the
Scottish average.
The employability programmes in South Lanarkshire are focused
on the people furthest away from the labour market.
ECON07 Percentage of people
earning less than the
living wage
10.00% 10.60% 13.50% 11.30% The percentage of people earning less than the living wage
increased in 2024/25 in comparison with 2023/24. This is higher
(worse) than the Scottish average.
The council leads a pan-Lanarkshire living wage campaign group
which aims to increase the number of employers signing up to
the Living Wage Pledge.
ECON08 Percentage of
properties receiving
97.60% 98.30% 99.20% 97.10% In 2024/25, there was an increase in properties in South
Lanarkshire with access to high-speed broadband and speeds
55

Page 56

Local Government Benchmarking Framework Results
Connect Outcome South Lanarkshire Council LGBF
Results 2024/25
LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
superfast broadband greater than 30 Mbps. This figure continues to rise slowly and
remains above the Scottish average for 2024/25.
Most of the properties not yet able to access high speed
broadband are located within rural areas and are isolated groups
of a few properties. These properties are either included within
the Scottish Government's Reach 100% (R100) investment
programme and projected to receive full fibre connection by the
end of 2028, or are too difficult or expensive to connect to an
existing network, and are therefore eligible for the Scottish
Broadband Voucher Scheme to help find alternative solutions.
ECON09 Town vacancy rates 14.00% 14.80% 14.90% 11.40% In 2024/25 the Town vacancy rate increased slightly in
comparison with 2023/24 and remains above (worse than) the
Scottish average.
This is substantially influenced by the major changes happening
in East Kilbride and Hamilton Town Centres which seek to
consolidate retail and realise other opportunities for the town
centres including residential development. The rest of our towns
continue to perform well with the majority showing vacancy rates
at or below the national average.
CORP07 Percentage of income
due from Council Tax
received by the end of
the year
97.00% 96.40% 96.40% 95.50% The percentage of income due from Council Tax in 2024-25 has
increased. South Lanarkshire’s performance continues to be
better than the Scottish average.
Actions: Work to maximise council tax income collection will
continue, utilising all available recovery methods.
FINSUS02 Uncommitted General
Fund Balance as a % of
council annual budgeted
net revenue
1.50% 1.40% 1.30% 1.90% The value of the Council’s Uncommitted General Fund balance
has not changed from 2019/2020. The council's budget has
increased therefore resulting in a minor decrease in the
percentage.
This is very much an arithmetic impact. Our uncommitted
balance has not changed, but the budget has changed due to
external factors including government grant ringfenced for
specific purposes. The council’s position on reserves is included
in the Revenue Budget Strategy.
FINSUS05 Actual outturn as a
percentage of budgeted
expenditure
100.00% 100.00% 100.00% 100.10% The outturn reflects that the council reported a breakeven
position after all transfers to reserves. The SLC position is
consistent across years, but movement in other councils' figures
may result in a change to our ranking going forward.
56

Page 57

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 11 August 2026
Report by: Chief Executive  
Subject: Self-Assessment and Improvement Activity
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise of a horizon-scanning self-assessment exercise carried out by Resources
annually to identify areas which might require improvement actions in the coming
year 
2. Recommendations
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted. 
3. Background
3.1. As reported to the Forum on 24 February 2026, the Council is expecting a Best
Value audit later this year.  As part of the preparations for this, the Council is
reviewing its approach to self-assessment and improvement to gain an overview of
activity in this area. 
3.2. This report summarises the background to and development of a self-assessment
horizon scanning exercise which is conducted annually by Resources.  At present,
this exercise feeds into the annual Resource Plans and provides an assurance that
key topics have been considered consistently and systematically across the Council. 
3.3. As noted at 5.4 below, self-assessment is an integral aspect of numerous
governance and reporting activities throughout the year.  By reviewing how self-
assessment is implemented across the Council, the aim is to assess if there are any
gaps in coverage and to ensure self-evaluation is used to drive improvement activity
through a systematic and consistent approach. 
3.4. The Council is engaging with the Improvement Service to undertake a corporate self-
evaluation later in the year.  The review of self-assessment and improvement activity
will feed into this exercise and inform the Council’s approach to self-assessment
going forward. 
4. The Council’s Approach to Self-Assessment
4.1. Self-assessment and the improvements arising from self-assessment are key
elements of Best Value.  To embed self-assessment across the Council, South
Lanarkshire developed a self-assessment programme, called Empower, which was
launched in 2008/2009.   
4
57

Page 58

4.2. The Empower approach was based on the Public Service Improvement Framework
(PSIF) which has been developed and promoted by the Improvement Service.  In the
first round of assessments, all services within the Council were reviewed within a 4-
year rolling programme. 
4.3. The Empower programme was delivered intensively through a further two 4-year
phases, focusing increasingly on areas of service delivery which were not otherwise
inspected or subject to external assessment.  In line with the approach taken by
external scrutiny agencies, self-assessments moved towards a risk-based and
proportionate model, directing attention to those services most in need of review
based on performance, risks, and operational challenges. 
4.4. Throughout this period, the self-assessment and improvement programme was
reported annually to Executive Committee (2008 to 2016) and to this Forum (from
2016). 
4.5. In 2020, to make best use of resources and in recognition of the scale of change
facing the Council, self-assessment and improvement activity was aligned with the
Covid 19 response and recovery and service reviews, rather than continue as a
stand-alone programme.  This change was endorsed by the Forum on 29 September
2020. 
4.6. Although no longer reported to the Forum, the horizon-scanning exercise which
formed the basis of the self-assessment has continued.  It informs the annual
Resource planning process and provides assurance that significant developments
are taken into account in service and Resource planning. 
4.7. Section 5 below explains how the horizon-scanning exercise works, alongside a
range of other self-assessment and assurance mechanisms undertaken by the
Council. 
5. Self-Assessment Process
5.1. The horizon-scanning exercise is carried out annually by each Resource to flag
potential areas/services that may benefit from self-assessment activity.  Various
sources of information are considered, including data and documents used by
scrutiny agencies. 
5.2. The horizon-scanning exercise is guided by a checklist and pro-forma which requires
Resources to consider key topics which may signal a need to undertake
improvement planning.  These topics range from performance measures to the
outputs from surveys.  Table 1 below lists the key topics and what they cover. 
Topic/horizon-scanning area To be considered
Local Government
Benchmarking Framework
(LGBF) – latest results
LGBF results where performance is worse than
the Scottish average are identified as possible
areas for improvement. These are the latest
results and comments/narrative as supplied by
Services/ Resources and included in the LGBF
report.
Benchmarking Active participation in benchmarking clubs or
organisations with a view to compare
performance and discuss issues. These will be
over and above the benchmarking events
organised by the Improvement Service and will
58

Page 59

often be under the auspices of professional
associations relevant to specific services.
Quarter 4 Progress Report –
RED measures
All red measures from the previous financial
year are considered.  Is any further work
required to improve results? 
Areas for Improvement A range of sources is reviewed to identify
potential areas for improvement, including
Council/Community Plan, Resource Plans,
Resource Management Team (RMT)/Corporate
Management Team (CMT) discussions,
Governance groups, Improvement groups.
Service/Efficiency Reviews
and/or Transformational
change
Consider any planned reviews for next year
including cross-service reviews. Self-
assessment activities may assist in identifying
areas of strength/weakness prior to a review or
form part of the planned activity.
Strategies/Plans/
Policies/Programmes
Consider plans and strategies which are due for
refresh or review, policies and programmes
which are new or changing.  Self-assessment
activities may assist in preparatory work by
identifying strength/weaknesses, consultations
required etc.
Statutory requirements New or revised legislation which will have an
impact on service delivery – self-assessment
may be valuable in understanding how services
can best respond to new or changing demands.
Internal Audit Review implications of the internal audit plan. 
Consider self-assessment in advance of Internal
Audit’s work to identify areas of strengths and
possible weakness.
Consultations/surveys Source: Council/community Plan, Resource
Plans, RMT/CMT/Committee Consultations -
South Lanarkshire Council.
Complaints Source:  annual overview report to Executive
Committee and an annual summary is available
on the website -  Complaints performance. 
5.3. The individual completed Resource pro-formas contain detailed updates across
these topics and are available on request.  Much of the information is reported to
Elected Members already under existing governance arrangements (see 5.4 below). 
The horizon-scanning serves to bring the information together for Resources in a
systematic and improvement-focused format. 
5.4. The horizon-scanning exercise described here takes place alongside a range of
other self-assessment and assurance activity, including:- 
 Service reviews which evaluate performance and delivery and are reported to the
Forum
 LGBF performance and action plan – reported twice a year to the Forum
 Audit action plan and audit actions – reported to Risk and Audit Scrutiny
Committee
 Good governance statement and action plan – reported to Risk and Audit
Scrutiny Committee 
59

Page 60

 Audit actions and recommendations arising from national reports – reported to
Committees as appropriate
 Actions and improvement arising from external inspection or audit activity –
reported to Committees as appropriate
 Service-specific improvement actions arising from external audit and inspection –
reported to Committees as appropriate
 Engagement with improvement frameworks for specific services, such as How
Good is Our School, Care Inspectorate Quality Frameworks, Scottish Housing
Regulatory Framework, etc. 
6. Next Steps
6.1. As noted in section 4 above, the Empower self-assessment programme evolved over
several phases, continually updated to meet the needs of the Council and the
changing scrutiny environment.  In line with this approach, the horizon-scanning
exercise will continue to be adapted to deliver benefits in the context of
transformational change across the Council in the coming years. 
6.2. The Council is engaging with the Improvement Service to undertake a corporate self-
evaluation later in the year.  This will use the PSIF approach to gain insight across a
number of corporate Best Value themes.  The results of this PSIF exercise will be
reported to the Forum, along with recommendations for the Council’s approach to
self-assessment going forward.  
7. Employee Implications
7.1. Employee implications relate to the ongoing time commitment and learning and
development as required. 
8. Financial Implications
8.1. There are no financial implications. 
9. Risk and Other Implications
9.1. The management of risk associated with the outcomes and actions referred to in
respect of the self-assessments will be considered as part of each Resource’s risk
management arrangements as appropriate. 
9.2. There are no sustainability issues as a result of this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. Consultation has been undertaken with officers from the Corporate Improvement
Advisory Board (CIAB) and Resource Senior Management Teams.   
Paul Manning
Chief Executive 
2 July 2026 
60

Page 61

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Performance and Review Scrutiny Forum 24 February 2026 – South Lanarkshire
Council Best Value Audit
 Performance and Review Scrutiny Forum 29 September 2020 - Self-Assessment and
Improvement Activity Annual Update 2019/2020 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tom Little, Head of Communications and Strategy
Ext: 4904 (Tel: 01698 454904)
Email: tom.little@southlanarkshire.gov.uk 
Performance: performance@.southlanarkshire.gov.uk 
61

Page 62

62

Page 63

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 11 August 2026
Report by: Chief Executive  
Subject: Annual Performance Spotlights 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Forum with the Annual Performance Spotlights (APSs) infographics
for 2025/2026 
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the infographics content of the Annual Performance Spotlights is noted;
and
(2) that the Annual Performance Spotlights be uploaded onto the Council’s
website in September 2026, well ahead of the statutory deadline of 31 March
2027. 
3. Background
3.1. The Council’s first Annual Performance Report (APR) was prepared based on
2011/2012 information and represented part of the Council’s ongoing commitment to
continuous improvement in respect of its approach to public performance reporting
(PPR). 
3.2. On 4 September 2018, the Forum considered a report which set out plans to review
the APR component of the Council’s PPR approach, in light of the continuing
evolution of the Accounts Commission’s expectations and taking into account
feedback from Audit Scotland on the APR in particular. 
3.3. A new approach was developed which replaced the APR document with Annual
Performance Spotlights (APSs) – bite sized web content performance information
comprising a case study, selection of infographics and links to other related material
- one for each Connect objective plus the theme Delivering the Plan and achieving
Best Value. 
3.4. Following extensive consultation and engagement the new Council Plan, Connect
2022 to 2027 was approved by Council on 15 June 2022 and the overall structure is
now based on six Outcomes and the Best Value theme. In line with this revised
structure, an Annual Performance Spotlight is presented for each of the Council’s six
Outcomes, comprising a case study, selection of infographics and links to other
material. 
5
63

Page 64

3.5. This report now provides the Forum with the opportunity to consider the draft
infographics content of the APSs. 
4. Current Position
4.1. The Improvement Unit has worked closely with services across the Council to bring
together the content of the APSs. The focus, at all times, has been to ensure that the
information included is of interest to the public, balanced and readily accessible.
These are key requirements of PPR, as set out by the Accounts Commission. 
4.2. The infographics for the APSs 2025/2026, as they will appear on the performance
pages of the Council’s website, are attached as Appendix 1. Further explanatory
narrative for those measures where targets were not met or where performance was
not improving in 2025/2026 is attached as Appendix 2. 
4.3. In line with the Council’s shift towards a digital first approach, the focus has been on
providing performance information as content on the web. The performance pages of
the Council’s website allow our customers, communities and residents to view the
information electronically.  In 2025/2026, the APS landing page on the website was
visited 646 times – in addition, the individual APS pages amassed a total of 991 hits,
giving a total of 1,637 hits. 
4.4. The spotlights use infographics to visually present information about the Council’s
performance. The infographics show performance against certain measures for each
of the Council’s six strategic Outcomes. In response to points made by the Accounts
Commission in the Best Value Assurance Report 2019 (BVAR) the following
improvements were made: 
 for each infographic, trend information is included with a clear indication
whether or not performance has improved and if the target has been met
 a link has been added directly below the infographic on the website to
supporting data or further reports or more detailed information 
4.5. In order to gather feedback which will help us to continue to improve our PPR
material, any messages received via the dedicated Performance and improvement
email address are monitored. 
4.6. To complement the APSs, we will continue to prepare the suite of PPRs which focus
on key areas of Council business. Each report includes a clear presentation of data;
targets and narrative to introduce and explain the performance indicators and
results; comparisons, customer feedback, satisfaction statistics and links or
signposts to further relevant information. These reports were praised by Audit
Scotland in their PPR assessment in 2015 and by the public in our web testing
exercise. Since they were first uploaded (at the end of March 2015), they have
attracted thousands of visitors to the performance pages of the website indicating
that there is an audience for the performance information, and that the web pages
provide us with a platform on which to report and highlight our performance to the
public. 
4.7.  The 2025/2026 Local Government Benchmarking Framework (LGBF) indicator
results are not due to be published by the Local Government Improvement Service
until January 2027, at the earliest. These will be included in our PPR material which
is to be completed by the statutory deadline of 31 March 2027, allowing us time to
analyse the results. 
64

Page 65

5. Public Performance Reporting Assessment 
5.1.  The Accounts Commission (the Commission) has a statutory responsibility to define
the performance information that councils must publish for performance comparisons
and benchmarking purposes. This is closely linked with the Commission’s Best
Value audit responsibilities. 
5.2. Since 2008, the Commission has taken steps to develop a more flexible approach to
its statutory responsibility to define the performance information that councils must
publish. 
5.3. The 2015 Direction set out a streamlined and more flexible set of performance
information for the 2016/2017 financial year and each year through to the financial
year ending March 2019. The Accounts Commission published their most recent
refresh of the Direction in December 2024 (for reporting the results for financial years
2025/2026 to 2027/2028). The additional requirements and implications will be taken
into account in the Council’s PPR material. 
5.4. As noted at 3.2 and 3.3. above, the APSs and the Council’s approach to PPR
generally continues to evolve in response to user feedback and changing legislative
requirements and guidance.  It is intended that the format of the APSs will continue
to be reviewed to ensure the documents keep pace with public expectations and also
with Audit Scotland’s requirements in respect of PPR, continuous improvement and
Best Value. The APSs will continue to be complemented by a full suite of
performance information on the Council’s website. 
6. Next Steps
6.1. The Forum is asked to note the APSs 2025/2026 infographics content for the
Council’s website. 
6.2. Looking forward, Council officers will continue to review the presentation of the
APSs, and PPR generally, to take account of changes arising. 
7. Employee Implications
7.1. There are no employee implications relating to this report. 
8. Financial Implications
8.1. There are no financial implications relating to this report. 
9. Climate Change, Sustainability and Environmental Implications
9.1 There are no Climate Change, Sustainability and Environmental Implications relating
to this report. 
9.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy. 
10. Risk and Other Implications
10.1. The work undertaken in the preparation of the APSs assists in providing assurance
that the Council is responding to its Best Value obligations in terms of continuous
improvement and public performance reporting. 
65

Page 66

11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
11.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
2 July 2026 
Link to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving
 Accountable, effective, efficient and transparent 
Previous References
 Performance and Review Scrutiny Forum (4 September 2018) – Review of the Annual
Performance Report
 Performance and Review Scrutiny Forum (19 August 2025) - Annual Performance
Spotlights 2024/2025
 South Lanarkshire Council (15 June 2022) - The Council Plan Connect 2022 to 2027
and the South Lanarkshire Community Plan 2022 to 2032 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904 (Tel:  01698 454904)
E-mail:  tom.little@southlanarkshire.gov.uk 
66

Page 67

Produced by Communications and Strategy. 070149/Jun26
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Children being looked after in a
community setting
Target met ✔ Performance maintained
Target: more than 90%
2024-25
90%
2025-26
90%
Children and
young people
Latest results
Council Plan
2022
2027
Pupils entering positive
destinations
Target met ✘ Performance improving ✔
Target: 97.0%
2024-25
96.4%
2025-26
96.6%
Note: 2025-26 education results are for academic year 2024-25.
The number of learners achieving
nationally recognised awards
Target met ✔ Performance improving ✔
Target: 1,298
2024-25
1,286
2025-26
1,365
Target met ✘ Performance improving ✘
Percentage gap between pupils from
the least and most deprived areas
entering positive destinations 
Target: 3.0%
2025-26
3.7%
2024-25
3.2%
UNSECURED FOR COMMITTEE ONLY
5
67

Page 68

Produced by Communications and Strategy. 070149/Jun26
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Note: 2025-26 education results are for academic year 2024-25.
Education
and learning
Percentage of pupils gaining
5 or more awards at SCQF 
level 5 or better
Target met ✔ Performance improving ✔
Target: 69%
2024-25
70%
2025-26
71%
Target: 94.6% Target: 93.0%
Target met ✘ Performance improving ✘
Percentage of pupils from the most
deprived areas gaining 5 or more
awards at SCQF level 5 or better
Target met ✔ Performance improving ✔
Target: 53%
2024-25
49%
2025-26
57%
Percentage of children and young
people attending primary school
Percentage of children and young
people attending secondary school
Target met ✘ Performance improving ✘
2024-25
88.3%
2025-26
87.9%
2024-25
93.8%
2025-26
93.7%
Primary School
Latest results
Council Plan
2022
2027
UNSECURED FOR COMMITTEE ONLY
68

Page 69

Produced by Communications and Strategy. 070149/Jun26
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Our
economy
Target met ✔  Performance improving ✘ 
Number of participants 
supported via council-operated
employability programmes
Target: 2,400
2024-25
3,059
2025-26
2,415
,
2024-25
804
2025-26
801
Number of participants accessing
further education or training
Target met ✔  Performance improving ✘
Target: 600
External funding secured for council
and community planning partners’
strategic community projects
(dependent on Government funding)
Target met ✔  Performance improving ✔
Target: £5.000m
2024-25
£7.124m
2025-26
£7.615m
£ ?
Number of participants gaining
sustainable employment
Target met ✔ Performance improving ✔
2024-25
725
2025-26
745
Target: 700
Latest results
Council Plan
2022
2027
UNSECURED FOR COMMITTEE ONLY
69

Page 70

Produced by Communications and Strategy. 070149/Jun26
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Communities
and environment
Target met ✔ Performance improving ✔
Percentage of household waste
sent to landfill
Target: 5.00%
2024-25
1.32%
2025-26
1.17%
Percentage of our road network
that should be considered for
maintenance treatment 
(Road Condition Index)
Target: 32.5%
32.5%
2024-25
31.8%
2025-26
Target met ✔  Performance improving ✔
Target met ✔ Performance improving ✔
Percentage of streets found to be
acceptable during Litter Monitoring
System (LMS) Surveys
Target: 92.0%
2024-25
92.6%
2025-26
93.9%
Target met ✘  Performance improving ✘
Percentage of total household
waste that is recycled
Target: 50.00%
2025-26
40.63%
2024-25
41.80%
Latest results
Council Plan
2022
2027
UNSECURED FOR COMMITTEE ONLY
70

Page 71

Produced by Communications and Strategy. 070149/Jun26
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Local authority and private 
Welfare guardianship visits
completed on time
Target met ✔ Performance improving ✘
Target: 75%
8484%%8888%%
2024-25 2025-26
Percentage of internal care
services graded ‘good’ or better 
in Care Inspectorate inspections
Health and 
Wellbeing
Target met ✔ Performance improving ✔Target met ✔ Performance improving ✔
Percentage of care at home 
hours reduced through 
Home Assessment team
2024-25 30%
2025-26 36%
Target: 30%
Target: 3,000
3,752 4,1042024-25 2025-26
Number of people participating
in a co-produced SDS
Assessment to exercise choice
and control over their care
2025-26
100%
Target: 75%
Target met ✔ Performance maintained
2024-25
100%
Latest results
Council Plan
2022
2027
UNSECURED FOR COMMITTEE ONLY
71

Page 72

Produced by Communications and Strategy. 070149/Jun26
If you need this information in another language or format, please contact us to discuss how we can best meet your needs.  
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk/connect
Housing 
and land
Target met ✔ Performance maintained ✔
Percentage of Housing Options
interventions where 
Homelessness prevented
Target: 70.0%
Percentage of lets to urgent
homeless (UH) households
Target met ✔ Performance improving ✘
Target: 55.0%
2024-25
62.5%
2025-26
59.9%
Percentage of new tenancies
sustained for more than a year 
for all lets
Target met ✔ Performance improving ✘
Target: 88.0%
2024-25
91.9%
2025-26
91.6%
Average time taken to relet 
empty properties
Target met ✔ Performance improving ✔
Target: 28.0 days
2024-25
19.3 
days
2025-26
18.1 
days
2024-25
60.0%
2025-26
75.9%
Latest results
Council Plan
2022
2027
UNSECURED FOR COMMITTEE ONLY
72

Page 73

Appendix 2
Explanatory narrative for those measures where targets were not met or where
performance was not improving in 2025-2026 
Outcomes:  Measure Target Perf Explanations/narrative
Education
and learning 
Percentage of
children and
young people
attending
primary school
X
(not
met)
X
(not
improving)
While the current year position has not yet met the
stretch target, primary school attendance remains
above the level achieved in earlier years and shows a
generally improving trend over the three-year period.
The target was set as an ambitious stretch aim to
drive sustained improvement and reduce inequalities,
rather than represent a minimum expectation.
Ongoing focus on attendance, wellbeing and early
intervention continues to support positive underlying
progress. The council-wide ‘Every School Day
Matters’ attendance campaign has since been
launched to promote the importance of regular
attendance.
Percentage of
children and
young people
attending
secondary
school
X
(not
met)
X
(not
improving)
Secondary school attendance continues to improve
compared with previous years and remains stable in
a challenging national context, although the stretch
target has not yet been achieved. As with other
wellbeing measures, the target was deliberately
ambitious to promote continuous improvement.
Targeted actions to support engagement, wellbeing
and sustained attendance are contributing to positive
longer-term progress. The council-wide ‘Every School
Day Matters’ attendance campaign has since been
launched to promote the importance of regular
attendance.
Children and
young
people
Pupils entering
positive
destinations
X
(not
met)

Performance
improving
The most recent School Leaver Destination Report
(SLDR) showed an increase in the number of pupils
who left school in academic year 2024-25 entered a
positive destination. Although the ambitious target
was not met, this remains an improvement from the
previous year and above the national rate.
Percentage
gap between
pupils from the
least and most
deprived areas
entering
positive
destinations
X
(not
met)
X
(not
improving)
The gap between most and least deprived has
increased slightly but remains lower than the national
gap.
Our
economy 
Number of
participants
accessing
further
education or
training

(met)
X
(not
improving)
The number of participants accessing further
education or training in 2025-26 (801) is very slightly
below the 2024-25 figure (804), but still significantly
exceeds the annual target of 600 participants. 
Number of
participants
supported via
council-
operated
employability
programmes

(met)
X
(not
improving)
The target (2,400) for the number of participants
supported via council-operated employability
programmes has been met. While there continues to
be strong demand for employability support, the
overall figure in 2025-26 (2,415) is lower than in
2024-25 (3,059). This reflects a targeted shift in focus
in 2025-26 towards supporting more parents and
individuals who face more complex or significant
barriers to employment and who therefore require
5
73

Page 74

Outcomes:  Measure Target Perf Explanations/narrative
earlier engagement. This means more intensive
support prior to entry onto employability programmes,
thereby impacting final numbers actually registered
onto the programmes.
Communities
and
environment
Percentage of
total household
waste that is
recycled
X
(not
met)
X
(not
improving)
This measure is reported per calendar year, so the
figure shown (40.63%) relates to the period January
to December 2025. The recycling rate is lower than
that reported for the same period in 2024 (41.83%).
Chargeable garden waste permits were introduced in
April 2025 and one of the known risks associated
with the scheme was reduction in the amount of
organic waste collected for recycling (composting).
However, the garden waste permit scheme is just one
factor affecting the recycling rate. In June 2025,
issues with the council's bulky waste treatment
contractor meant that waste that had been previously
recycled needed to be sent to landfill until a new
contract was awarded. The new contract commenced
on 1 October 2025 and the service continues to
monitor the contract performance and its impact on
waste statistics.
Health and
wellbeing 
Local authority
and private
Welfare
guardianship
visits
completed on
time

(met)
X
(not
improving)
Whilst there has been a slight year-on-year decrease,
performance remains above the revised target.  At
the same time, demand for Welfare Guardianship
Orders increased by 14% over the period 2021-22 to
2025-26.
From reporting year 2024-25, the internal target was
revised and reduced from 90% to 75% to ensure that
it aligns with comparable statutory social work
indicators and remains achievable within current
service capacity.
From July 2024, the frequency of Supervising Officer
visits was revised in line with Scottish Government
guidance, including the removal of the additional six-
monthly visit, ensuring a proportionate and nationally
consistent approach to visit intervals.
Housing and
Land 
% of lets to
urgent
homeless (UH)
households 

(met)
X
(not
improving)
Although target was exceeded, the proportion of
permanent lets directed towards homeless
households reduced by 2.6%. This reflects the
pattern of properties which became available and the
requirement to meet the needs of other high priority
groups.
% of new
tenancies
sustained for
more than a
year for all lets

(met)
X
(not
improving)
Although target exceeded, performance reduced by
0.3% in 2025-26. This indicator continues to be
management focus and is reported to the Scottish
Housing Regulator on an annual basis. 
74

Page 75

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 11 August 2026
Report by: Chief Executive  
Subject: Accounts Commission Audit of Best Value – Angus
Council 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Forum of key messages and recommendations from recent reports
published by the Accounts Commission on Best Value
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendation(s):-
[]
(1) that the key messages and recommendations within the report be noted.
[1recs]
3. Background
3.1. Towards the end of 2023, the Accounts Commission introduced a new approach to
the Audit of Best Value to replace the Best Value Assurance Report (BVAR) regime
which had run from 2018 to 2023. 
3.2. The approach consists of brief Controller of Audit (CoA) reports accompanied by and
reflecting on published annual audit reports. These CoA reports are considered by
the Commission in public and reported publicly. 
3.3. The CoA reports are intended to offer a BV-focused reflection on the Council’s annual
audit report.  In line with the previous practice of bringing BVAR findings to the Forum
to highlight good practice and place our own activities in context, the findings from the
recent CoA reports are summarised below. 
4. Angus Council (published 4 June 2026)
4.1. Angus Council receives a favourable report, with auditors commending the council’s
strong leadership, clear priorities and culture of continuous improvement. There is also
praise for constructive working relationships and commitment to community
engagement.  The council’s approach to balancing budgets, however, is not seen as
sustainable in the longer term and auditors note that performance across the council
is mixed.  The Commission findings are: 
6
75

Page 76

 The council is well run, with strong leadership, and a clear vision and priorities
that are effectively communicated to communities across Angus. A culture of
continuous improvement is evident. Collaboration is a notable strength, both
internally and with partners, with examples such as Tayside Contracts (with
Dundee City and Perth and Kinross councils) demonstrating effective and
enduring joint working. We are impressed by the level of partner involvement with
the council’s Change Programme and jointly funded work focused on prevention.
Maintaining this collaborative approach will be essential to sustain service
delivery, address ongoing financial challenges, and deliver for communities.
 Performance across council services is mixed. However, the introduction of a
new Performance Management Framework aligned with council priorities is
positive. As the framework becomes embedded, we would encourage the council
to scrutinise whether performance in priority areas is improving, including relative
to other councils. This should enable clearer demonstration of the impact of
decision making and targeted investment.
 Positive and constructive working relationships between officers and elected
members are evident, reflecting a shared sense of responsibility and a
willingness to take difficult decisions. Sustaining these relationships will be
particularly important in the context of the 2027 local government elections, given
the ongoing need to address the budget gap and reduce reliance on reserves.
 Although the council’s use of reserves is well-managed and aligned with its
policy, the approach taken to balance budgets up to 2025/26 is not sustainable
in the longer term. Continued action is required to deliver sustainable solutions,
including further recurring savings, more ambitious transformation through its
well-established Change Programme, and building on its already strong ethos of
partnership working.
 The council is demonstrating a real commitment to community engagement,
notably through the Engage Angus tool, which is used to test priorities, explore
budget scenarios and support members to take difficult and sometimes
unpopular decisions about services. It is particularly encouraging that the council
has extended the tool’s reach as part of annual budget engagement, enabling
people who are often underrepresented to participate and have their voices
heard. Communicating with communities will be especially important to ensure
that they are clear about the impact of future savings and changes to services.
 We are encouraged that the council recognises the importance of data in
supporting strategic decision-making and we look forward to the outcome of its
skills audit in this area. As data and digital capabilities become increasingly
critical to service delivery and to achieving financial and non-financial benefits
from the Change Programme, we also look forward to the auditor’s assessment
of the formalisation of the assurance process in relation to third-party hosted IT
systems, particularly in light of increasing cyber risks for all councils. 
5. Next Steps and Recommendations
5.1. Officers of the Council will continue to review the CoA reports as they are published
to learn any lessons for the Council. Reports on any significant findings and key
messages will be brought to the Forum for information. 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
76

Page 77

8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Risk and Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There is no requirement for consultation on the content of the report. 
Paul Manning
Chief Executive 
7 July 2026 
Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
77

Page 78

78

Page 79

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 11 August 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Transformational Review Programme – Summary of
Outcomes Report 2025/2026 and Future Pipeline 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a summary of the outcomes from the Council’s Transformational Review
Programme for the year 2025/2026, and the Future Pipeline of Transformation 
2. Recommendation(s)
2.1. The Performance and Review Scrutiny Forum is asked to approve the following
recommendation(s):- 
(1) that the summary of outcomes from the Council’s Transformational Review
Programme (section 4 / Appendix 1), be noted;
(2) that the transformation themes and pipeline of activity moving forward (section
5 / Appendix 2), be noted;
(3) to note that the transformation programme will continue to be developed and
refined in line with changes in legislation, demand, financial assumptions and
operational challenges (section 5.3); and
(4) that the approach to benefits realisation (section 6), the planned template for
monitoring and reporting outcomes (Appendix 3) and the governance
arrangements in place, be noted. 
3. Background
3.1. South Lanarkshire Council continues to operate in a period of sustained change and
increasing financial pressure, as demonstrated in the report ‘Revenue Budget
Strategy 2027/2028’ to the Council’s Executive Committee on 24 June 2026. To
continue delivering effective, high‑quality services for our residents, we must plan
proactively for the future and adapt how we operate in the face of a range of
challenges, including economic pressures, demographic change, increasing demand
for services, legislative requirements and rapid technological development. 
3.2. To address these factors and bridge the Budget Gap for 2027/2028 to 2028/2029
and beyond, the Council employs a continuous focus on transformation and
improvement; our Transformational Change Programme is clearly linked to the
Council Plan, financial plans and digital strategy and builds on the work undertaken
over many years, where service reviews have taken place and which have fed into
the savings options that Members have considered. 
7
79

Page 80

3.3. The most recent update to this Forum on 12 May 2026 detailed the progress of
Cross-Cutting reviews, as well as Resource specific transformational reviews, to
identify savings in the year 2027/2028 and beyond. As this programme of change
progresses, officers work continuously to identify and realise further areas of
transformation and efficiency, and this report covers what we are currently doing, our
continued plan for change, and how we will monitor and report this to this Forum
moving forward. 
3.4. This report brings together information presented to the Executive Committee on 24
June 2026 concerning previous/current transformation activity (section 4) alongside a
forward‑looking programme of work (section 5). It sets out how the Council intends to
respond to these challenges, balance future budgets and improve services over the
coming years. 
3.5. A key part of transforming (and any change) is to monitor the outcomes realised as
part of the transformation. Section 6 details the benefits realisation approach we will
adopt moving forward, while section 7 looks at the governance process in place to
support this, including future reporting to this Forum.
4. How South Lanarkshire is Transforming
4.1. One of the key drivers for transformation is the need to balance the Council’s budget.
As reported to the Executive Committee (2027/2028 and 2028/2029 Revenue
Budget Strategy), the expected Budget Gap over the next two years is £26.500
million, before taking account of any increase in Council Tax. The transformation
programme is expected to contribute towards closing the Budget Gap, and the
programme identifies where savings may be achieved, with updates on reviews
being reported on to this Forum for information as each area of work progresses. 
4.2. However, finance is not the only reason to transform. South Lanarkshire Council is
already delivering a number of transformation programmes that have the potential to
significantly change how services are delivered and how the Council operates.
These programmes span organisational redesign, the Council’s property estate,
digital development, system modernisation and partnership working. 
4.3. More recent initiatives include participation in the Marmot programme, the Third
Sector Review, significant systems developments as well as the programme of
service reviews contributing towards efficiency and savings targets. Together, these
programmes demonstrate a sustained commitment to improvement and
transformation across the organisation. 
4.4. Appendix 1 shows the many areas of Transformation that have already taken place
in recent years, and includes detail of the impact, both financial where relevant, and
also the impact in terms of service outcomes. It shows the wide-ranging work carried
out across the Council to meet the financial challenges we face, but also to change
services for the better, to improve the customer experience, and importantly, to
improve people’s lives across South Lanarkshire. 
4.5. The programme of service reviews in Appendix 1 has delivered nearly £6 million in
savings towards the 2025/2026 and 2026/2027 budget, with more anticipated in
future years. These savings are being delivered through Council-wide and Resource-
specific activities focused on ongoing efficiencies, maximising the use of resources,
improving and adapting services and spend to save initiatives. 
80

Page 81

4.6. As well as these efficiency reviews, Transformation activity has taken place through
reviews across Resources, through the implementation of Large-Scale Systems
Implementation, and through investment monies including the Transformation Fund
for South Lanarkshire Leisure and Culture. These are detailed in Appendix 1. 
5. Pipeline of Activity
5.1. As described above, the driver for our need to change is how we need to react to a
changing local authority environment. This includes changing demand for services,
as well as the need to continue to balance our budgets every year. 
5.2. The planned programme of change is detailed in Appendix 2. This consolidates
ongoing programmes with new and planned programmes of work. All of these have
been combined into their relevant themes as detailed by 5.4. 
5.3. The programme outlined represents a position at a point in time and looks ahead
over the next 3 years. Given the changing environment, it is essential that this
programme remains flexible and is subject to regular review. This programme is
designed to be fluid and to be added to. Changes to the programme will reflect
changes to legislation, demand or operational challenges, or may need to change to
reflect changes in our financial strategy. 
5.4. In doing this, the transformation programme looks to align with the ambition set out in
the Council Plan and is structured around key themes which reflect the Council’s
priorities and the scale of change required. These are: 
Ongoing efficiencies and spend‑to‑save. 
Aligns with Council Plan Priority “We will work to recover, progress and improve”
and Council Plan Value “Accountable, effective, efficient and transparent”. 
Recognising the benefits of prevention. 
Aligns with Council Plan Priority “We will work to put people first and reduce
inequality” and Council Plan Outcome “People live the healthiest lives possible”. 
Maximising the use of our resources, including buildings, workforce and
technology. 
Aligns with Council Plan Priority “We will work to recover, progress and improve” 
Being an enterprising Council, including opportunities for income generation. 
Aligns with Council Plan Priority “We will work towards a sustainable future in
sustainable places” and Council Plan Outcome “Thriving business, fair jobs and
vibrant town centres”. 
81

Page 82

Improving and adapting services to better meet the needs of people and
communities in South Lanarkshire. 
Aligns with the Council Plan Vision “Improve the lives and prospects of everyone
in South Lanarkshire”. 
6. Benefits Realisation
6.1. It is important to understand what we expect to achieve through the programme of
transformation. To support this, a benefits realisation approach has been developed
which will set out at the outset what we expect to achieve from the programme of
work. 
6.2. Benefits may include cashable savings, productivity improvements and qualitative
service improvements for customers and service users. The approach will also
define how success is measured and reported, providing transparency and
accountability for delivery. 
6.3. Appendix 3 provides the planned template for monitoring outcomes from
programmes. As they commence, we will record what we expect in the way of
benefits (both quantitative and qualitative). We can then use that assessment to
monitor and report on progress as the programme progress. 
7. Governance
7.1. The Performance and Review Scrutiny Forum will continue to receive updates on the
overall programme of transformation, recognising that Executive Committee and
Individual Resource Committees will have a role to play in decision making where
necessary. 
7.2. Papers to the Performance and Review Scrutiny Forum will provide updates on a
quarterly basis for the whole programme, including benefits realisation. 
7.3. At an officer level, programmes will continue to be monitored by a programme of
senior officer meetings, with Lead Officers at Head of Service Level, sponsored by
Executive Director. The programme would be monitored through the provision of
information on the benefits realisation template (Appendix 3). 
8. Financial Implications
8.1. Section 4 of this report provides a reminder of the key financial challenges that the
Council faces. The transformation programme is expected to contribute towards
closing the Budget Gap. Section 4 / Appendix 1 of this report provides a summary of
outcomes from the Council’s Transformational Review Programme to date, including
savings achieved over the past 2 financial years. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications at this stage of the process. 
10. Other Implications
10.1. There are no other implications at this stage of the process. 
82

Page 83

11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required at this point. 
Jackie Taylor 
Executive Director (Finance and Corporate Resources) 
7 July 2026 
Link(s) to Council Values/Priorities/Outcomes
 All council objectives 
Previous References
 Performance and Review Scrutiny Forum of 12 May 2026
 Executive Committee of 24 Jun2 2026 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
83

Page 84

Appendix 1
Transformation Programme – Benefits Realisation 
Achievements to date from current and ongoing reviews, including cashable and non-cash implications
Programme Lead
Resource
Programme Summary Transformation
Theme
Benefits Realisation (including
financial implications)
2025/2026 and 2026/2027 Approved Savings from Programme of Reviews
Procurement Finance &
Corporate
Resources
(FCR)
Review and strengthening of corporate
procurement arrangements to maximise
compliance, improve value for money and
identify savings opportunities, including
collaborative procurement. 
Ongoing
efficiencies and
spend‑to‑save
Cashable Savings 
£1.043 million of savings included in the
2026/2027 Budget Strategy, with a total
of £1.984 million delivered since
2025/2026. Further savings are targeted
for future years. 
Overtime FCR / All
Resources
Review of overtime usage, controls and
workforce planning arrangements across
services to better manage demand, reduce
reliance on premium costs and to support the
health and wellbeing of employees. 
Ongoing
efficiencies and
spend‑to‑save
Cost avoidance / Cashable Savings 
£0.991 million of savings included in the
2026/2027 Budget Strategy, with a total
of £1.355 million delivered since
2025/2026. 
Charging FCR / All
Resources
Review of fees and charges to ensure alignment
with policy, affordability and cost recovery
principles where appropriate. 
Enterprising
Council
Income generation 
£0.200 million of savings included in the
2026/2027 Budget Strategy, with a total
of £0.575 million delivered since
2025/2026. 
84

Page 85

Organisational
and
Management
Structures
FCR / All
Resources
A review of management and supervisory
structures in order to align to the current
Preferred Operating Model and generate
organisational benefits of enhancing efficiency,
consistency, and capacity across Council
services, as well as identifying savings for
2026/2027 and 2027/2028. 
Ongoing
efficiencies
Cashable Savings 
£0.900 million of savings included in the
2026/2027 Budget Strategy, with a total
of £1.900 million delivered since
2025/2026.
Digital
Transformation
FCR Maximising digital, and investment in digital
systems and process automation to streamline
activity and ensure resources are suitably
deployed to priority projects across three key
areas of focus: Business Systems and
Processes, Workforce Productivity and
Customer Engagement. 
Maximising use
of resources
Productivity savings 
£0.030m saving secured for 2026/2027
through a website contract refresh
making the website more user friendly
and accessible. Further developments as
well as financial savings are expected in
future years. 
Customer
Engagement
FCR Improving how residents engage with Council
services, including channel shift, improved
access and customer experience. 
Improving and
adapting
services
Qualitative benefits / Likely cashable
savings 
£0.048 million of savings included in the
2026/2027 Budget Strategy 
The programme is defined by two
workstreams covering: Continuous
Improvement (new solutions to automate
processes with improved workflow and
getting it right first time for the customer)
and Transformational Change (new
technologies such as investment in a
new Customer Experience Platform). 
85

Page 86

Planning and
Regulatory
Community
and
Enterprise
Resources
(CER)
The introduction of charges for a range of new 
discretionary advice and support services for
Planning and Building Standards. 
Enterprising
Council
Cashable Savings 
£0.272 million of savings included in the
2026/2027 Budget Strategy. 
Pre-application advice services are
tailored to reduce workload and make
the formal planning process more
timeous. 
South
Lanarkshire
Leisure and
Culture (SLLC)
CER /
SLLC
Aligning governance and ensuring ongoing
discussions around financial sustainability to
build a sustainable approach to how the Council
and SLLC work together. 
Maximising use
of resources
Sustainability for SLLC / Savings for SLC 
Youth. Family
and
Community
Learning
(YFCL) 
Education
Resources
(EDR)
The identification of service improvements and
efficiencies while maintaining high standards of
delivery and ensuring equitable access and
outcomes for young people, adults, and families. 
Improving and
adapting
services
£0.465 million of savings included in the
2026/2027 Budget Strategy.  
Consideration was given to the entire
remit of services across South
Lanarkshire. It highlighted areas of the
service that could be better aligned to
locality-based models and areas of the
service that were operating with
particular success. The review also
identified a need to enhance the current
locality-based models across all YFCL
services, strengthening community-
based provision. 
86

Page 87

Other Resource Reviews
In-House and
Procured
Services
FCR / All
Resources
A robust examination of existing contracts and
areas of high spend in order to ensure that Best
Value is being delivered. This review assessed
the Council’s statutory powers, current contract
terms, considerations of cost, and factors within
the Resource / Service itself such as capacity
and capability, to ensure that the Council
maximises its ability to deliver services in-house
where appropriate. 
Maximising use
of resources /
Spend to save
Cost avoidance 
A greater proportion of works being
brough in-house, facilitated by staff
recruitment. This has reduced the
reliance on external delivery and allows
greater control over programming, 
performance and workforce. 
The review also noted many areas of
good practice where in-house provision
is actively considered, as well as areas
of collaborative working with external
parties to deliver best value and mitigate
areas of high risk.
Shared
Services
FCR The Council engages with SOLACE and the
Improvement Service across a number of
workstreams as part of the national
SOLACE/Improvement Service Transformation
Programme. Workstreams cover public sector
reform, opportunities for collective
transformation, and building the capacity to lead
and deliver the work.
Improving and
adapting
services
Cost avoidance / Cashable Savings /
Income Generation as a result of shared
(national) procurement practices,
reduced duplication aided by the Duties
and Powers Portal and the development
of a sector-wide digital assets register.
This work is ongoing.
Third Sector
Partnership
FCR The development of The South Lanarkshire
Third Sector Partnership Agreement, which set
out better ways of working together, including a
commitment by the Council to include the local
third sector in strategic and service delivery
discussions. This was co-produced with the
local third sector, alongside a Third Sector
Grants Policy that establishes clear and
transparent processes for payments from the
Council to the sector.
Enterprising
Council
Enhanced partnership working between
the Council and Third Sector and the
creation of fair, open and transparent
processes for accessing Council funding
and increased stability within existing
resources with £0.300 million permanent
funding included in the 2026/2027
Budget.
87

Page 88

Fleet CER Progress has been made in returning the
Council fleet to pre-COVID levels. Collaboration
with the wider transformational review
programme is ongoing to identify any fleet
implications and savings as reviews are
progressed. Work continues on a review of the
Fleet Strategy, which will include a review of key
strategic outcomes. 
Maximising use
of resources /
Spend to save
Collaboration with Resources continues
across the programme of reviews, with
the potential to internalise areas of
expenditure and increase alignment with
Council priorities.
Routes to
Work South
(RTWS)
CER RTWS operates as an Arms-Length External
Organisation, and, given the changes in
employability policy and in the funding
landscape over recent years, a review of the
current delivery mechanism was undertaken. 
Maximising Use
of Resources
Cost avoidance / Sustainability for RTWS 
This review resulted in a reduction in
duplication and costs, ensuring
appropriate financial control by the
Council while increasing the reach of
parental employability support to
communities across South Lanarkshire. 
Estates
Strategy
Housing
and
Technical
Resources
(HTR)
Review and rationalisation of the Council estate
to reduce / avoid cost, considering net zero
challenges, improve utilisation and support new
ways of working. 
The Council’s Estate Strategy supports future
public service delivery, encourage collaboration
with other public sector bodies, and guides
decisions about investment, rationalisation, co-
location, and asset disposal. 
Maximising use
of resources
Cashable savings in future years / Cost
Avoidance 
The objective of the Strategy is to
prioritise a high-quality, energy-efficient
estate, focussing on maintaining the
buildings we retain and making them fit
for purpose.  
88

Page 89

Factoring HTR A full review of the Council’s Factoring Service
is ongoing. This service provides a repairs and
maintenance service to owners of former
Council Houses, with a view to delivering a high-
quality effective service.
Improving and
adapting
services
The Review will inform the future
direction of the Factoring Services, its
function and service delivery model. The
outcome will be reported to Committee in
September.
Property
Services
HTR The review considered the organisational
structure and the span-of-control. 
Maximising use
of resources /
spend to save
Reduced reliance on subcontractors
through the expansion of in-house teams
for electrical testing, kitchen upgrades
and fencing works. Void performance
has also improved, reducing rent free
periods.
Large-Scale Systems Developments
Housing,
Social Care
and Oracle
Fusion
FCR / HTR
/ Social
Work
Resources
(SWR)
Modernisation of core systems to improve
service delivery, data quality, integration and
staff productivity.
Maximising use
of resources
Productivity and service delivery benefits
are anticipated from all new systems, as
well as cashable savings from the
implementation of Oracle Fusion. 
Liquidlogic and One Housing are newly
implemented and any financial benefits
are not yet realised.
South
Lanarkshire
Futures
SWR / HTR Led by South Lanarkshire Council, in
partnership with Barnardo’s and local services,
the project supports young people transitioning
from care to independent living. 
Improving and
adapting
services /
Recognising the
benefits of
prevention
By January 2025, five young people had
been supported into independent living,
reducing out-of-area placements and
homelessness presentations. The project
generated £0.230 million in savings for
2024/2025. Further placements will allow
the Council to achieve the full year
impact of £1.6 million in 2026/2027. 
The Project has been shortlisted for the
Chartered Institute of Housing Awards
2025 as a finalist for the Marion Gibb
Award for Equality in Housing. 
89

Page 90

Analogue to
Digital
FCR / SWR Shared Cloud-Based Alarm Receiving Centre
(ARC) Solution this project ensured the
continued delivery of community alarms services
ahead of the UK-wide analogue switch off in
October 2025. 
Improving and
adapting
services
The project focuses on service
improvement with the cloud-based
system offering efficiencies through
flexible working and better data access.
A key outcome for the project is for the
use of digital solutions to assist in
preventing hospital admissions or the
need for long-term care for sheltered
housing tenants. 
Marmot – Pilot EDR / All
Resources
Pilot activity focused on prevention and reducing
inequality through embedding proportionate
universalism within service delivery. 
Recognising the
benefits of
prevention
Long‑term demand reduction
2026/2027 Investments
Children’s
Services –
Pods 
Social Work
Resources
(SWR)
The 2026/2027 budget includes a £0.500 million
investment in accommodation units which will
further support delivery of The Promise by
enabling young people to gain experience of
living independently prior to moving to their own
home.
Improving and
adapting
services
Cashable savings to assist in the Budget
Recovery Plan for Children and Family
Services, as well providing transition
housing for young people and improving
their outcomes.
Culture
Strategy
CER Facilitation of a place based, culture strategy by
through funding to provide for local community
led activities and events sharing and celebrating 
heritage, local history, arts and culture. 
Improving and
adapting
services
Investment in communities and their
culture, recognising that each town and
village in South Lanarkshire has its own
identity.
Supporting
and
Developing
Local
Business
CER An allocation of £3.500 million for Supporting
and Developing Local Business. 
Improving and
adapting
services
An offering of higher value grants for
businesses to upgrade commercial
stock, invest to meet the demand for
commercial space and for the Council to
improve its own business centres, to
support the business community in South
Lanarkshire.
90

Page 91

Energy
Efficiency 
Investment of £1.000 million to expand the
Energy Efficiency Programme. 
Spend to Save Investment will improve energy efficiency
in Council facilities and allow a recurring
investment fund to deliver future projects
supporting the transition to Net Zero. 
As reported to the Climate Change and
Sustainability Committee on Climate
Change and Sustainability Committee
(17 June 2026), the combined carbon
emissions reduction over the two years
(2024/2025 and 2025/2026) has been
calculated at 1,404 tonnes of CO2, with
estimated cost avoidance of £1,033m 
realised through low cost measures to
save energy. 
Leisure and Culture Transformation Programme
Capital
Investment in
Buildings
South
Lanarkshire
Leisure and
Culture
(SLLC)
£13 million investment across the SLLC Estate
to improve the user experience and rejuvenate
the offer for customers. 
Improving and
adapting
services /
Maximising the
use of
resources
As well as a better user experience, the
improvements will assist SLLC in
developing a sustainable business
model. 
91

Page 92

Appendix 2
Transformation Programme Pipeline
Note: Programme summaries below are drafted for reporting purposes and can be refined as project scope and timelines are confirmed.
Programme Ongoing
/ new
Lead
Resource
Programme Summary Transformation
Theme
Indicative
Timeline
Financial
Implications
Procurement Ongoing  Finance &
Corporate
Resources
(FCR)
Review and strengthening of corporate
procurement arrangements to maximise
compliance, improve value for money and
identify savings opportunities, including
collaborative procurement. 
Ongoing
efficiencies and
spend‑to‑save
Ongoing Cashable
savings
Overtime Ongoing FCR / All
Resources
Review of overtime usage, controls and
workforce planning arrangements across
services to better manage demand and reduce
reliance on premium costs. 
Ongoing
efficiencies and
spend‑to‑save
Short to
medium
term
Cost
avoidance /
Cashable
Savings 
Charging Ongoing FCR / All
Resources
Review of fees and charges to ensure alignment
with policy, affordability and cost recovery
principles where appropriate. 
Enterprising
Council
Ongoing Income
generation
South
Lanarkshire
Leisure and
Culture (SLLC)
Ongoing Community
and
Enterprise
Resources
(CER) /
SLLC
Aligning governance, and ensuring ongoing
discussions around financial sustainability 
Maximising use
of resources
Medium
term
Sustainability
for SLLC /
Savings for
SLC 
Digital
Transformation
Ongoing FCR Maximising digital, and investment in digital
systems and process automation to streamline
activity
Maximising use
of resources
Medium
to long
term
Productivity
savings
92

Page 93

Programme Ongoing
/ new
Lead
Resource
Programme Summary Transformation
Theme
Indicative
Timeline
Financial
Implications
Customer
Engagement
Ongoing FCR Improving how residents engage with Council
services, including channel shift, improved
access and customer experience.
Improving and
adapting
services
Short to
medium
term
Qualitative
benefits /
Likely
cashable
savings 
Estates
Strategy
Ongoing Housing
and
Technical
Resources
(HTR)
Review and rationalisation of the Council estate
to reduce / avoid cost, considering net zero
challenges, improve utilisation and support new
ways of working.
Maximising use
of resources
Medium
to long
term
Cashable
savings /
Cost
Avoidance 
Assets –
Commercial
Opportunities
New All
Resources
Identification of opportunities to generate
income or realise value from Council land
particularly around commercial / industrial
space. 
Enterprising
Council
Medium
term
Income
generation
ASN Transport
/ Fleet
New Education
Resources
(EDR) /
CER
Review of ASN transport and wider fleet
arrangements to improve efficiency,
sustainability and value for money.
Ongoing
efficiencies and
spend‑to‑save
Medium
term
Cost
Avoidance /
Cashable
savings 
Systems
Developments
– Housing and
Social Care
Ongoing HTR /
Social Work
Resources
(SWR)
Modernisation of core systems to improve
service delivery, data quality, integration and
staff productivity.
Maximising use
of resources
Short
Term 
Productivity
benefits
Marmot – Pilot New  Education
Resources
(EDR) / All
Resources
Pilot activity focused on prevention and reducing
inequality through embedding proportionate
universalism within service delivery.
Recognising the
benefits of
prevention
Medium  
to Long
term
Long‑term
demand
reduction
93

Page 94

Programme Ongoing
/ new
Lead
Resource
Programme Summary Transformation
Theme
Indicative
Timeline
Financial
Implications
Children’s
Services –
Pods / Gap
Homes
New Social Work
Resources
(SWR)
Development of internal provision to reduce
reliance on external placements and improve
outcomes for children and young people.
Improving and
adapting
services
Medium
term
Cashable
savings
Children’s
Services – Day
Placements
(Outwith
Placements)
New SWR / EDR Reduction in the use of outwith placements
through service redesign and increased
in‑house capacity.
Improving and
adapting
services
Medium
term
Cost
avoidance /
Cashable
savings 
School Estate New Education
Resources
(EDR)
Review of school estate utilisation to ensure
long‑term sustainability.
Maximising use
of resources
Medium
to Long
term
Efficiency
Early Years New Education
Resources
(EDR)
Review of early years provision to ensure
alignment with demand.
Improving and
adapting
services
Medium
to Long
term
Efficiency
Joint
Collaboration /
Improvement
Service
Programme
Ongoing FCR / All
Resources
Participation in national and regional
collaboration and improvement activity to
support best practice and efficiency.
Ongoing
efficiencies and
spend‑to‑save
Ongoing Efficiency /
possible
cashable
savings  
Waste New Community
and
Enterprise
Resources
(CER)
Improvements to recycling performance,
preparation for future regulatory change and
exploration of income‑generation opportunities.
Enterprising
Council
Medium
to Long
term
Cashable
savings 
94

Page 95

Appendix 3
Benefits Tracker Template
A benefits tracker template will be used to record expected benefits (cashable,
productivity and qualitative) at the outset of each programme and to monitor progress and
realisation over time.
Summary Benefits Tracker 
Programme Benefits Cashable /
Qualitative
Status (RAG) 
Detailed Benefits Tracker 
Programme Name  
Programme Owner  
Expected Benefits  
Description of benefit 
Measure (original) This could be a KPI, or other
qualitative measure (from before the transformation) 
Measure (expected) Ambition / target.  
Expected Timeframe for Benefit  
How will progress be reported? 
Progress Check  
Date of assessment  
On Track (RAG)  
If not on track – what action are we
taking? 
95