Democracy Spraffa

Agenda Document Pack - Performance and Review Scrutiny Forum - 12/05/2026

South Lanarkshire Council · 12 May 2026
Back to Performance and Review Scrutiny Forum — 12 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Friday, 01 May 2026 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 12 May 2026
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members
Joe Fagan (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers, Maureen
Devlin, Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
24 February 2026 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Consideration 
3 Local Government Benchmarking Framework Overview Report 2024/2025
Report dated 16 April 2026 by the Chief Executive.  (Copy attached) 
7 - 12 
4 Local Government Benchmarking Framework 2024/2025 Results and
Action Plan
Report dated 23 April 2026 by the Chief Executive.  (Copy attached) 
13 - 58 
5 Accounts Commission Audit of Best Value – Aberdeenshire Council and
Shetland Islands Council
Report dated 14 April 2026 by the Chief Executive.  (Copy attached) 
59 - 62 
6 Transformational Reviews – Update
Report dated 8 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
63 - 70 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370 089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 24 February 2026 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor John Anderson, Councillor Maureen Chalmers, Councillor Gerry Convery (Depute),
Councillor Maureen Devlin, Councillor Katy Loudon, Councillor Davie McLachlan, Councillor Kirsten
Robb, Councillor John Ross 
Councillor’s Apology:
Councillor Richard Lockhart 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy; L Marshall, Finance
Adviser; N Reid, Research and Improvement Manager
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development
Finance and Corporate Resources
J Taylor, Executive Director; S Jessup, Administration Assistant; T Slater, Administration Adviser 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s) Item(s) Nature of Interest(s) 
Anderson  Transformational Review of Routes to Work
South
Board Member of Routes
to Work South 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Performance and Review Scrutiny Forum held on 25
November 2025 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
Councillor Chalmers joined the meeting during consideration of the above item of business 
3 Accounts Commission Audit of Best Value – North Lanarkshire Council 
A report dated 26 January 2026 by the Chief Executive was submitted on the key messages and
recommendations from a recent report published by the Accounts Commission on Best Value. 
Towards the end of 2023, the Accounts Commission introduced a new approach to the Audit of
Best Value to replace the Best Value Assurance Report (BVAR) arrangements which had run
from 2018 to 2023. 
The approach consisted of brief Controller of Audit (CoA) reports accompanied by, and
reflecting on, published annual audit reports.  The CoA reports were considered by the Accounts
Commission in public and reported publicly.
2
3

Page 4

Information was provided on the findings and key messages from the recent CoA report for
North Lanarkshire Council. 
The Executive Director (Finance and Corporate Resources) responded to a member’s questions
on various aspect of the report and undertook to:- 
 re-share information on this Council’s reserves balance that was reported to the Finance
and Corporate Resources Committee
 look at North Lanarkshire Council’s Annual Audit Report and the commentary made on
reserves, with a view to providing the Forum with a summary of any issues that this
Council could learn from 
The Forum decided: that the key messages and recommendations within the
Controller of Audit report for North Lanarkshire Council be
noted. 
4 South Lanarkshire Council Best Value Audit 
A report dated 26 January 2026 by the Chief Executive was submitted on preparations for South
Lanarkshire Council’s next Best Value audit, which was expected to take place in November
2026. 
Information was provided:- 
 on how the audit of Best Value for local authorities had evolved since 2003
 on the approach that had been taken since 2023, which had integrated the Best Value
audit into annual financial audit work to increase efficiency and reduce the scrutiny burden
on councils
 on the focus of Controller of Audit (CoA) reports, which had replaced the previous Best
Value Assurance Report (BVAR) arrangements, with each council expected to be the
subject of at least 1 CoA report within a 5-year audit period
 on the completion of the Action Plan developed following the Council’s most recent audit in
2019, as detailed in Appendix 1 to the report
 summarising Best Value findings since the start of the new approach in 2023
 outlining actions arising from the annual audits for 2022/2023 to 2024/2025, as detailed in
Appendix 2 to the report
 on the next steps for preparation, with an update report being submitted to the Forum on
11 August 2026 
Officers responded to members’ questions in relation to various aspects of the report. 
The Forum decided: that the contents of the report be noted. 
5 Transformational Reviews – Update 
A report dated 29 January 2026 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the Transformational Reviews that were part of the
Council’s Transformational Change Programme for the year 2025/2026 and beyond. 
At its meeting on 26 June 2024, the Council’s Executive Committee noted the Transformational
Change Programme that was required to drive continuous improvement and efficiencies, and
link into the Budget Strategy over the next 3 years.
4

Page 5

Updates had been provided to previous meetings of the Forum.  This report provided a further
update on the following cross-cutting and Resource specific transformational reviews being
undertaken:- 
 Procurement
 Overtime
 Customer Engagement
 Digital Transformation
 Organisational and Management Structures
 Third Sector Review
 Shared Services Review
 Factoring
 Long-term Estate Strategy (including Depot Rationalisation)
 Planning and Regulatory
 Property Services – Efficiencies and Income Generation 
A separate update report on the findings of the Routes to Work South (RTWS) review had been
included on the agenda for this meeting. 
Savings identified from the reviews had been presented to the Executive Committee on 5
November 2025 for consideration as part of the 2026/2027 proposals to reduce the budget gap. 
The updated savings position, as a result of Transformational Reviews, was £3.284 million for
2026/2027, as summarised in paragraph 7.1 of the report. 
The Chair highlighted that the reviews were not just about financial savings, but were also about
delivering better services. 
The Forum decided: that the update on Transformational Reviews be noted. 
[Reference: Minutes of 25 November 2025 (Paragraph 7) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 9) and 5 November 2025 (Paragraph 9)] 
6 Transformational Review of Routes to Work South 
A report dated 16 January 2026 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the Transformational Review of Routes to
Work South (RTWS). 
RTWS was a South Lanarkshire based company limited by guarantee and a registered charity
that delivered a range of employability programmes on behalf of the Council.  RTWS was
established in 2005 and operated as an Arms-Length External Organisation (ALEO) of the
Council, delivering services through Teckal arrangements which were negotiated on an annual
basis. 
A transformational review had been undertaken which included engagement with a range of
stakeholders.  The findings of the review were outlined in the report, and an options appraisal
was carried out which considered 5 options, also outlined in the report.  Option 5, which was to
maintain Council membership of RTWS and the current Teckal arrangements and to reduce the
overlap between RTWS and Council service provision, was the preferred option and was
approved by the Executive Committee at its meeting on 3 December 2025.
5

Page 6

At that meeting, the Executive Committee delegated authority to the Executive Director
(Community and Enterprise Resources) to implement Option 5 and the associated actions, in
consultation with the Head of Administration and Legal Services. 
The review also highlighted some potential conflicts of interest for Council officers undertaking
director roles in ALEOs and the Articles of Association would be amended to ensure that a
majority of Directors were independent of the Council.  The Board would, therefore, consist of 6
independent, co-opted Directors and 4 Council appointed Directors.  Four elected members
would be identified for appointment to the Board, one from each locality.  A report seeking
approval of the appointment of 4 elected members and 6 independent co-opted Directors would
be submitted to a future meeting of the Executive Committee. 
It was noted that there was a typographical error in the report at paragraph 7.5, bullet point 2,
where it should refer to 6 independent co-opted Directors, rather than 5. 
The Forum decided: 
(1) that the contents of the report be noted; 
(2) that the proposal to take forward Option 5, to maintain the Council membership of Routes
to Work South (RTWS) and the current Teckal arrangements, and to reduce the overlap
between RTWS and Council service provision, as approved by the Executive Committee,
be noted; 
(3) to note that the Executive Committee had delegated authority to the Executive Director
(Community and Enterprise Resources) to implement Option 5 and the associated actions,
in consultation with the Head of Administration and Legal Services; and 
(4) to note that a report, seeking approval of the appointment of 4 elected members and 6
independent co-opted Directors to the Board of RTWS, would be submitted to a future
meeting of the Executive Committee. 
[Reference: Minutes of 19 November 2024 (Paragraph 7) and Minutes of the Executive
Committee of 3 December 2025 (Paragraph 14)] 
Councillor Anderson, having declared an interest in the above item of business, withdrew from the
meeting during its consideration 
7 Urgent Business 
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 12 May 2026
Report by: Chief Executive  
Subject: Local Government Benchmarking Framework Overview
Report 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide a summary of the key messages from the Local Government
Benchmarking Framework (LGBF) overview report published by the Improvement
Service in March 2026 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted. 
3. Background
3.1. The Local Government Improvement Service (LGIS) publishes a national LGBF
overview report each year, reflecting on the results and identifying key themes and
messages presented by the data. 
3.2. The 2024/2025 overview was published in March 2026 and is the fourteenth report in
the series, drawing upon more than a decade of LGBF data. 
3.3. This report summarises the key messages within the LGBF overview report. 
3.4. A further report on the agenda of this meeting provides the forum with South
Lanarkshire Council’s own initial LGBF results for 2024/2025 
4. The 2024/2025 Overview Report – Structure and Focus
4.1. In recent years (since the 2021/2022 report) the LGIS has reduced the size of the
report and moved towards a more analytical and thematic treatment of the results. 
This has been achieved by shifting the publication of results onto an online platform,
leaving the overview to focus on a more discursive approach. 
4.2. The latest report is structured around the following themes: 
 Financial Pressures
 Workforce Challenges
 Health and Social Care Pressures
 Education for Children and Young People
 Tackling Poverty
 Performance of Local Government Services  
3
7

Page 8

4.3. The overview report complements the publication of the LGBF dataset on the online
dashboard. The dashboard provides the complete LGBF dataset comprising more
than ten years’ worth of data across more than 100 indicators. The dashboard also
provides access to a wide range of financial data which is collected alongside the
LGBF and profiles spending patterns across councils over time. 
5. Key Messages
5.1. The 2024/2025 report is published at a time when Scotland’s local government is
operating under sustained financial, workforce and demand pressures that are now
structural in nature. Despite significant innovation, service redesign and partnership
working, councils are reaching the limits of what can be delivered within existing
resources. The LGBF highlights areas of continued improvement but also deepening
pressures that threaten long-term sustainability. 
Financial Pressures
5.2. Local government finances face escalating stress as funding consistently fails to
keep pace with inflation, demand growth and expanding national commitments.
Increasing ringfencing and new statutory obligations continue to restrict flexibility,
while demographic demand pressures contribute to a £10bn long-term gap.
Reserves have been depleted below prudent levels, increasing reliance on debt –
especially within the Housing Revenue Account, where financing costs now
consume over 20% of rental income. 
5.3. Statutory services, primarily education and social care, absorb over 70% of
expenditure, leaving limited scope for discretionary or preventative investment.
Infrastructure continues to deteriorate faster than councils can fund repairs. 
5.4. Key structural pressures include: 
 funding not keeping pace with inflation, demand or policy commitments 
 demographic pressures outstripping resources
 declining reserves and rising debt dependency
 reduced local flexibility due to ringfencing
 significant risks in the Housing Revenue Account
 deteriorating assets, especially roads 
Workforce Challenges
5.5. Workforce pressures remain one of the biggest risks to service continuity. Staffing
levels sit below those of 20 years ago while costs now represent nearly 70% of
council spending. Absence rates have reached record highs. 
5.6. Recruitment and retention challenges are acute in social care, social work, planning
and environmental health. High turnover and pay constraints create ongoing fragility
across essential services. Service specific workforce pressures persist, including
fragile care sector staffing and specialist teacher shortages in STEM (science,
technology, engineering or mathematics) and rural areas. 
5.7. An ageing workforce (over half are aged 45–64) presents succession risks, while
minority ethnic and disabled employees remain under-represented. Gaps in data
quality hamper effective planning. 
8

Page 9

Health and Social Care 
5.8. Demand for adult social care continues to grow sharply due to ageing populations
and increasing complexity. Although expenditure has risen by 31% since 2010/2011,
most additional funding is absorbed by inflation and pay rather than expanded
capacity. 
5.9. System capacity remains constrained by workforce shortages and provider fragility.
Re-admissions, delayed discharge bed days and unmet need are increasing. 
5.10. Structural pressures include insufficient workforce capacity, reduced availability of
intermediate and community services, and rising complexity among adults aged both
18–64 and 65+. 
Education
5.11. Education services show signs of recovery but continue to face growing complexity
and workforce pressures. Although real terms spending has risen by 19.8% since
2010/2011 reflecting national policy commitments, Additional Support Needs (ASN)
have grown substantially, now affecting over 40% of pupils. 
5.12. Primary attainment has surpassed pre pandemic levels and poverty related gaps
continue to narrow. However, attendance remains below historic norms and a small
but growing cohort of pupils experience entrenched non-attendance linked to anxiety
and complex ASN. 
5.13. Early years developmental outcomes are improving in relation to 27-30 month health
reviews, but are uneven across Scotland, shaped by differences in workforce
capacity and specialist support. 
Tackling Poverty 
5.14. Despite easing inflation, poverty pressures remain significant. Households face high
housing and energy costs, limited income growth and entrenched labour market
inequalities. 
5.15. Child poverty fell slightly in 2023/2024 but remains above 2014/2015 levels. Rent
arrears have fallen for the first time in years and Council Tax collection is stable, but
demand for crisis support remains consistently high. The Scottish Welfare Fund
continues to exceed core allocations and Discretionary Housing Payments have
risen to £89.3m, driven by the widening gap between rent levels and benefit
uprating. 
5.16. Councils are strengthening strategic approaches to poverty through improved data,
spatial analysis and whole system initiatives such as Fairer Futures Partnerships and
Whole Family Support. However, without wider reform in income, housing and social
security, pressures on local safety net services will persist, limiting opportunities for
more preventative action. 
Performance of Local Government Services 
5.17. Two thirds of LGBF indicators have improved since the baseline, but recent progress
has slowed significantly due to compounding pressures. 
5.18. Long term gains are evident across educational attainment, positive destinations,
personalisation in social care, older people supported at home, recycling, carbon
emissions and local procurement. 
9

Page 10

5.19. However, several areas that previously showed improvement – such as placement
stability, planning performance and road condition – are now stagnating or declining.
Persistent challenges – such as high absence levels, delayed discharges and
declining public satisfaction – underscore deeper structural pressures. 
5.20. Innovation remains strong, with councils modernising services through digital tools,
data driven models, community hubs and cross sector partnership working. Good
practice continues to emerge through peer collaborative improvement and LGBF
Practice Sharing events, helping councils to learn from each other and scale
effective approaches. 
6. Next Steps and Recommendations
6.1. The full data set for the LGBF is available through the LGIS explore the data tool.  To
complement the national dashboard, a South Lanarkshire LGBF dashboard has
been developed which focuses on strategic indicators aligned to the Council Plan. 
7. Employee Implications
7.1. There are no direct employee implications. 
8. Financial Implications
8.1. There are no direct financial implications. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
10. Other Implications
10.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
11.2. Consultation was not required to inform the contents of this report. 
Paul Manning
Chief Executive 
16 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving
 We will work to progress and improve  
10

Page 11

Previous References
 None 
List of Background Papers
 National Benchmarking Overview Report 2024/2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
11

Page 12

12

Page 13

Report
Agenda Item 
To: Performance and Review Scrutiny Forum
Date: 12 May 2026
Prepared by: Chief Executive 
Subject: Local Government Benchmarking Framework
2024/2025 Results and Action Plan
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide the Forum with the Local Government Benchmarking Framework
(LGBF) results for 2024/2025
 provide the Forum with explanatory narrative for the suite of indicators, including
the proposed actions, where appropriate, being taken to address those LGBF
indicators where the results are declining and/or are below the Scottish average
 provide a family group analysis of those LGBF indicators where South
Lanarkshire Council’s (SLC’s) result is below the Scottish average 
2. Recommendations
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the importance of interpreting Local Government Benchmarking
Framework measures in the local context, as detailed in sections 4.1 to 4.4,
be noted;
(2) that the results, narrative, actions and family group analysis included,
following the scrutiny of the 2024/2025 results, be noted; and
(3) that the arrangements for the publication of South Lanarkshire Council’s
results, in accordance with the statutory requirements, be noted.
3. Background
3.1. The core purpose of the LGBF is to make comparisons on spend/cost, performance
and customer satisfaction results over several years and also between similar
councils. It comprises a suite of performance indicators, collated under the following
service headings: 
 Children’s Services
 Corporate Services (ie support services)
 Adult Social Care
 Culture and Leisure Services
 Environmental Services
 Housing Services
 Corporate Assets
 Economic Development 
 Climate Change 
 Financial Sustainability 
4
13

Page 14

3.2. These headings represent approximately 70% of local authority spend. 
3.3. Publication of the LGBF results is a statutory requirement set out by the Accounts
Commission in the Direction to local authorities as required by the Local
Government Act 1992. It is seen as a key part of councils’ commitment to Best
Value, public performance reporting (PPR) and continuous improvement. 
3.4. This report presents the 2024/2025 LGBF results (on a Service by Service basis)
and sets out commentary and improvement actions against those indicators. Of
particular interest in terms of continuous improvement are those indicators which
are declining and/or falling below the Scottish average.  The steps and actions
identified in the report will not necessarily show immediate improvements - many
are long term plans. 
4. Interpreting the LGBF Results: Limitations and Cautions
4.1. Although the LGBF results are available for all councils in Scotland – and, therefore,
can be used to construct council league tables – the Local Government
Improvement Service cautions against this approach, emphasising that the purpose
of the data is to act as a ‘can-opener’ for discussions about performance and
improvement in the context of specific services, considering geography,
demographics and local council priorities. 
4.2. Within this report, South Lanarkshire’s performance trend for the past 3 years is
provided, together with the most recent year’s performance relative to the Scottish
average.  As with the LGBF as a whole, these summary figures are intended to
frame a closer examination of the underlying data and context for specific
indicators. For this reason, it is necessary to pay close attention to the narrative
against each indicator (provided in Appendix 1, ‘Comments’ column) when forming
a judgement about what the performance means in a South Lanarkshire context. 
4.3. All statistics require, for correct interpretation, a knowledge of potential limitations. 
In particular, the following specific points should be borne in mind when reviewing
the LGBF results: 
 local policy decisions can impact on the LGBF results and interpretation of the
data.  This is particularly true for cost indicators in the LGBF suite, where lower
costs are generally equated with good performance.  In these instances, where
the Council has opted to invest resources (for example in the school estate),
costs will appear higher than the Scottish average or for comparable councils,
and performance may be assessed as ‘worse’
 a number of satisfaction measures within the LGBF are derived from the
Scottish Household Survey (SHS).  There are important limitations to this data –
which the Council has highlighted for several years now.  First, the number
sampled is very small relative to the population – in 2024, interviews were
carried out with 430 adults in South Lanarkshire, equating to less than 0.1% of
the adult population. Second, survey respondents are asked how satisfied they
are with services even if they have not used the service in question.  Third, for
these indicators, the Council conducts its own surveys of service users so that it
can closely monitor and respond to user experiences.  These surveys – of
people who have used the services – invariably rate the services more highly
than the SHS. Also, note that during 2020 and 2021 the mode of the survey
changed significantly as a result of limitations imposed by the Covid pandemic.
Due to these limitations, the data from 2020 and 2021 was published as
experimental data and is not directly comparable with data from other years 
14

Page 15

 the figures within the LGBF are the result of a wide range of service provision
models and data collection processes carried out in each of Scotland’s 32
councils.  While the LGBF endeavours to achieve high standards of
completeness and consistency, there are inevitably differences between
councils and between indicators in terms of what is counted and how it
translates into LGBF performance 
4.4. These points are not intended to undermine the LGBF results.  Rather they serve to
emphasise the importance of looking individually at each service and each indicator
to understand the local drivers and determinants of performance. 
4.5. The Improvement Service published a new Guidance document to assist elected
members in Understanding and using the LGBF to help promote a culture of driving
improvement. 
5. Results and Key Messages
5.1. The report attached as Appendix 1 summarises the recent results for South
Lanarkshire Council, indicating whether performance in 2024/2025 has improved
(↑) or declined (↓) compared with 2023/2024 results, and if performance is better
() or worse (X) than the Scottish average in 2024/2025. It also includes
explanatory narrative for the movements in performance between 2023/2024 and
2024/2025. 
5.2. The table below summarises SLC’s performance: 
Table 1 – Summary of Performance of LGBF Results (at 31 March 2026) 
KEY:
Number (%) of indicators
2022/23 2023/24   2024/25
South Lanarkshire performance   
↑ improving performance in SLC 53 (52%) 51 (50%) 47 (46%)
↓ declining performance in SLC 36 (35%) 42 (41%) 37 (36%)
↔ No change in performance in SLC  4 (4%)   6  (6%)   4  (4%)
--- Results/trends not available   9 (9%)   3 (3%) 15 (14%)
Comparison with Scottish average   
✓ SLC results better than Scottish average 51 (50%) 57 (56%) 53 (52%)
X SLC results worse than Scottish average 40 (39%) 40 (39%) 34 (33%)
↔ SLC results same as Scottish average   2 (2%)   2  (2%)  1  (1%)
-- Results not available    9 (9%)   3 (3%) 15 (14%) 
2022/2023 results as at August 2024 update
2023/2024 results as at September 2025 update
2024/2025 results as at 31 Mar 2026 (23.04.26) 
NOTE: one new indicator under the Financial Sustainability service heading was
recommended for inclusion in the LGBF suite in 2024-2025
Fin Sus06 – Reliance on reserves as a % of Net Expenditure  
15

Page 16

5.3. Across the 103 indicators in the 2024/2025 suite, SLC’s performance improved
against 47 (46%) indicators, remained the same against 4 (4%) indicators, and
declined for 37 (36%) indicators. There are 15 (14%) indicators for which the results
or trend information is not yet available for 2024/2025, including adult social care,
tackling climate change and looked after children. It is hoped that these results will
be available when the 2024/2025 data is refreshed over the coming months. 
5.4. In terms of South Lanarkshire’s figures relative to the Scottish results, performance
was better than the Scottish average for 53 (52%) indicators, remained the same
against 1 (1%) indicator and was worse than the average for 34 (33%) indicators. 
There are 15 (14%) indicators for which the 2024/2025 results are not yet available. 
5.5. Following an Audit Scotland recommendation, The Forum (at their meeting on 29
November 2019) agreed to introduce a family group analysis in the annual reporting
of the Council’s LGBF results. Similar to our focus on reporting the results, the family
group analysis is based on those indicators where the council is performing worse
than the Scottish average. This analysis is attached at Appendix 2. 
6. Publication of the Data
6.1. The 2024/2025 data has been shared on the Local Government Improvement
Service interactive LGBF Dashboard - Explore the data. The Local Government
Improvement Service published their national overview report on 11 March 2026,
which includes the key messages, trends and results from across Scotland as a
whole and the challenges facing councils in the context of current funding
pressures, growing demand and work to tackle inequality and poverty. 
6.2. At a local level each council is required to publish its own results at the same time
as the publication of the Overview report by the Local Government Improvement
Service. As in previous years, the LGBF results information for SLC will be
uploaded on to the Council’s website, together with contextual information about
and explaining the indicators. In addition South Lanarkshire’s LGBF Dashboard will
be updated for the 2024/2025 results and commentaries. 
7. Next Steps
7.1. The actions identified in the comments column in Appendix 1 will be implemented.   
7.2.   These 2024/2025 results (as at 31 March 2026) are to be considered final at this
time and will be uploaded onto the performance pages on the Council’s website and
South Lanarkshire’s LGBF Dashboard, following approval at PRSF. However, data
is refreshed by Local Government Improvement Service on its dashboard as and
when it becomes available. An updated 2024/2025 results report will be prepared
for the Forum in 6 months’ time, and following approval, will be uploaded onto the
Council’s website. A similar update will be made at this time to South Lanarkshire’s
LGBF Dashboard.  
16

Page 17

7.3. The Local Government Improvement Service organise annual benchmarking
events, in which colleagues from specific services representing all local authorities
are invited to attend, to come together to learn and share good practice for their
particular area of operation. The Local Government Improvement Service align
these events with existing networks/forum wherever possible, minimising
duplication of discussions and bringing together relevant expertise. Following a
break due to the Covid crisis in 2020, these events resumed via Teams during
2021. This has proved to be a popular move away from the in person events with
more interested ‘performance’ officers able to attend from across Scotland. In SLC,
where officers are unable to attend, they can access the learning materials from the
events on the Knowledge Hub. 
8. Employee Implications
8.1. There are no employee implications.
9. Financial Implications
9.1. There are no direct financial implications arising from this report. To further the work
of the Local Government Improvement Service in relation to the LGBF, each
Scottish local authority is requested to make a £3,783 annual contribution for the
three year period: 2024/2025 to 2026/2027. This is to be met from within existing
budgets. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
11. Other Implications
11.1. There are no risk or other implications associated with the content of this report. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
12.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
23 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving  
17

Page 18

Previous References
 The Forum Report: LGBF 2023/2024 Results and Action Plan (13 February 2025) 
List of Background Papers
 LGBF results 2024/2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Tom Little, Head of Communications and Strategy
Extension: 845 4904 (Tel: 01698 454904)
Email: tom.little@southlanarkshire.gov.uk 
18

Page 19

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Children's Services CHN01 Cost per primary school
pupil
£7,364.00 £7,635.00 £7,755.00 £7,615.00 Costs have risen modestly but remain close to the national
average; we continue to prioritise value for money while
sustaining quality, with attainment indicators monitored alongside
spend to assure impact.
CHN02 Cost per secondary
school pupil
£8,755.00 £9,124.00 £9,277.00 £9,345.00 Expenditure increased in line with sector pressures (estate
investment and staffing), yet performance remains broadly in line
with Scotland; our focus is ensuring this investment translates to
senior phase outcomes.
CHN03 Cost per pre-school
education place
£11,177.00 £11,733.00 £11,151.00 £12,083.00 Unit cost reduced and is now below the national average;
efficiencies have been achieved while maintaining quality, with
inspection outcomes monitored to ensure no adverse impact.
CHN04 Percentage of pupils
gaining 5+ awards at
level 5
70.0% 70.0% 71.0% 69.0% SLC improved slightly between 2023/24 and 2024/25 and
continues to perform above both the Family Group average and
the national figure. This sustained performance reflects our
ongoing focus on high quality learning, teaching and
assessment, supported by continuous self evaluation and
system wide improvement planning aimed at raising standards in
literacy and numeracy across all secondary schools.
CHN05 Percentage of pupils
gaining 5 or more
awards at level 6
40.0% 42.0% 44.0% 41.0% SLC performance improved in 2024/25, remaining above both
the Family Group average and Scotland average. This progress
aligns with our strategic priorities to strengthen curriculum
pathways and ensure consistent, high quality practice in learning
and teaching, particularly in the senior phase, to support more
learners to achieve at higher levels.
CHN06 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 5
52.0% 49.0% 57.0% 53.0% SLC performance improved between 2023/24 and 2024/25. This
improvement places SLC above the Family Group average and
the Scotland figure, representing stronger progress for learners
from deprived areas. This reflects our sustained focus on equity
and inclusion, targeted use of data to identify need, and
coordinated support through school  and system level
improvement activity to reduce the attainment gap.
CHN07 Percentage of pupils
from deprived areas
gaining 5 or more
awards at level 6
25.0% 21.0% 27.0% 24.0% Performance improved in 2024/25. SLC now performs above
both the Family Group average and Scotland average, marking
encouraging progress in higher level attainment for young people
from deprived areas. This improvement is consistent with our
prioritisation of equity focused approaches, strengthened senior
4
19

Page 20

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
phase pathways and targeted support to help learners progress
to higher level qualifications
CHN08a The gross cost of
"Children Looked After"
in residential based
services per child per
week
£4,477.00 £5,159.00 ------ ------ Data not yet available
CHN08b The gross cost of
"Children Looked After"
in a community setting
per child per week
£360.00 £404.00 ------ ------ Data not yet available
CHN09 Percentage of children
being looked after in the
community
89.50% 90.00% ------ ------ Data not yet available
CHN10 Percentage of Adults
satisfied with local
schools
72.00% 72.00% 70.00% 69.00% Adult satisfaction with local schools remains stable and
continues to sit above the national average. This is supported by
consistently strong outcomes in external inspection reports,
where evaluators routinely include interviews with parents and
carers as part of their evidence base. These findings reinforce
the positive views captured through the Scottish Household
Survey and reflect sustained confidence in the quality of
learning, teaching and support across our schools and nurseries.
CHN11 Percentage of pupils
entering positive
destinations
96.9% 96.4% 96.6% 95.7% SLC performance increased slightly in 2024/25. While this
remains above the national figure, SLC is marginally below the
Family Group average. This strong and stable level of
performance sits alongside ongoing work to strengthen skills for
learning, life and work, including enhanced partnership working
and a continued focus on supporting young people to make
successful transitions beyond school.
CHN12a Overall Average Total
Tariff
981 961 985 922 Average tariff improved and remains above the Scottish average;
work on curriculum breadth and recognition of wider awards is
helping sustain attainment at S4–S6
CHN13a % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
73.5% 74.6% 73.2% 74.5% Literacy dipped marginally and is now just below the national
average; targeted supports through the Scottish Attainment
Challenge and school level interventions are focused on
recovery and improvement.   We are strengthening support for
20

Page 21

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Literacy teachers’ understanding and use of CfE achievement data, with
structured professional dialogue designed to build confidence
and consistency in professional judgement. Similar dips have
been seen previously when we emphasise professional
judgement approaches, and we expect performance to recover
as these practices embed across schools.
CHN13b % of P1, 4, 7 pupils
combined achieving
expected Curriculum for
Excellence Level in
Numeracy
81.6% 81.5% 80.2% 80.3% Numeracy remains broadly in line with Scotland with a slight year
on year reduction; schools are continuing with core numeracy
programmes and targeted interventions to consolidate progress.
This will run alongside our work to strengthen teachers’
understanding of CfE achievement data.
CHN14a Literacy attainment gap
P1,4,7 combined - %
point gap between the
least deprived and most
deprived pupils
22.30% 21.80% 19.80% 19.40% The poverty related literacy gap narrowed further and is close to
the national level; SAC funded approaches and data informed
targeting are supporting continued improvement along with work
to strengthen teachers’ understanding of CfE achievement data.
CHN14b Numeracy attainment
gap P1,4,7 combined -
% point gap between
the least deprived and
most deprived pupils
17.70% 17.40% 17.70% 16.60% The numeracy gap is broadly unchanged and slightly wider than
the national average; we are intensifying targeted numeracy
support and tracking to accelerate closing the gap.
CHN17 % of children meeting
developmental
milestones
81.90% 82.70% ------ ------ Data not yet available
CHN18 % of funded early years
provision which is
graded good/better
85.70% 94.40% 92.00% 89.00% Inspection grades remain strong and above Scotland overall,
with a slight reduction from last year; continuous improvement
activity with providers is in place to sustain quality.
CHN19a School attendance rate 90.10% 90.50% 91.10% 91.00% Attendance improved notably and is above the national average;
our refreshed attendance framework and inclusive supports are
helping more pupils sustain regular attendance.
CHN19b School attendance rate -
looked after children
83.20% 84.40% ------ ------ Data not yet available
CHN20a School exclusion rates
(per 1,000 pupils)
18.10 ------ 20.40 15.20 Exclusions increased compared with the previous cycle and are
above Scotland; we are strengthening staged intervention,
inclusion supports and alternatives to exclusion to reverse this
trend.
21

Page 22

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
CHN20b School exclusion rates
(per 1,000 looked after
children)
146.00 ------ ------ ------ Data not yet available
CHN21 Participation rate for
16-19 year olds
93.30% 93.80% 94.00% 93.30% Participation increased again and remains above the national
average, reflecting strong collaboration with SDS and partners to
keep young people in learning, training or work.
CHN22 % of child protection
re-registrations within 18
months
8.50% 9.90% 7.40% 6.80% Performance has improved compared to the previous year, with
the proportion of child protection re-registrations within 18
months reducing from 9.9% in 2023-24 to 7.4% in 2024-25. This
improvement is also reflected in a strengthening national
position, with South Lanarkshire’s ranking improving from 25th to
23rd. Notwithstanding this progress, performance remains above
the Scottish average.
Re-registrations are monitored quarterly through the Child
Protection Committee, in line with the Scottish Government
minimum dataset, and are subject to ongoing audit activity by the
Data and Quality Assurance Sub-Group. Local analysis indicates
that overall, re-registration volumes have remained relatively
stable, with sustained improvement in reducing re-registrations
occurring within six months. While the national indicator captures
re-registrations within an 18-month period, local findings suggest
re-registrations are generally occurring later than in previous
years, providing assurance that children are not being
de-registered prematurely.
CHN23 % Looked After Children
(LAC) with more than 1
placement in the last
year (Aug-July)
13.90% 15.10% ------ ------ Data not yet available
CHN24 Percentage of children
living in poverty (After
Housing Costs)
23.6% 19.5% 12.8% 14.8% The figures included as a source for this measure are different
from previous years, and use an alternative methodology to
calculate the percentage of children living in relative poverty -
defined as Children Living in Relative Low Income Families (After
Housing Costs). The data source that had been used previously
to report for the LGBF to represent child poverty were unofficial,
produced by Loughborough University on behalf of the End Child
22

Page 23

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Poverty Coalition/ Child Poverty Action Group, and showed a
higher figure for FYE 2024   e.g. South Lanarkshire= 19.5%/
Scotland= 23%. Statistics from this source have been
discontinued after FYE 2024.
The new ONS data (distributed through DWP Stat Xplore) will be
regarded as the source figures to represent the level of relative
child poverty (After Housing Costs) by the UK and Scottish
Governments going forward, instead of the ECPC/ CPAG data.
Although the new ONS figures are significantly lower than the
ECPC/ CPAG 2024 data used to report for this measure in March
2025, both sets of statistics confirm the continuation of the same
overall trend, that of a declining percentage of children living in
relative poverty (After Housing Costs) over the past 2 years, and
confirm that the South Lanarkshire rate for relative child poverty
continues to run below the Scottish average.
Climate Change CLIM01 CO2 Emissions area
wide per Capita
3.99 3.76 ------ ------ Data not yet available
CLIM02 CO2 Emissions area
wide: emissions within
scope of Local Authority
(LA) per Capita
3.26 3.04 ------ ------ Data not yet available
CLIM03 Emissions from
Transport per Capita
(New)
23.34 21.90 23.94 29.38 This indicator records the annual carbon dioxide emissions from
Transport per 1,000 population (in tonnes) within the local
authority area.
The 2024/25 data show an increase in transport emissions of
10.8% compared to 2023/24 with a 10.9% reduction overall
compared to the baseline year of 2017/18.
The South Lanarkshire figure remains below (better than) the
Scottish average of 29.38 tonnes.
CLIM04 Emissions from
Electricity per Capita
(New)
39.11 39.14 37.81 45.60 This indicator records the annual carbon dioxide emissions from
Electricity per 1,000 population (in tonnes) within the local
authority area.
23

Page 24

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Emissions from electricity have fallen significantly in recent
years, largely due to the decarbonisation of the grid. The figure
for South Lanarkshire has reduced by 54.1% since the baseline
year of 2017/18 and reduced by 3.2% compared to 2023/24.
The figure is below (better than) the Scottish average of 45.6
tonnes.
CLIM05 Emissions from Natural
Gas per Capita (New)
73.49 67.68 64.58 55.52 This indicator records the annual carbon dioxide emissions from
Natural Gas per 1,000 population (in tonnes) within the local
authority area.
Emissions from gas have fallen in recent years largely due to the
decarbonisation of the gas network. The 2024/25 figure for South
Lanarkshire shows a reduction of 4.3% compared with 2023//24
and a fall of 15.2% since the baseline year of 2017/18.
The figure for South Lanarkshire is above (worse than) the
Scottish average of 55.52 tonnes. This can be attributed to some
large industrial gas users being located within the South
Lanarkshire area and a high percentage of housing being
located on the gas grid.
Corporate Asset CORP
-ASSET01
Percentage operational
buildings that are
suitable for their current
use
95.30% 95.60% 95.40% 85.70% Performance has decreased slightly, compared to last year.
The total buildings classified as suitable for their current use
decreased slightly as a number of properties assessed as
suitable were subject to concessionary leases and Community
Asset Transfers.
Continued implementation of the council's asset management
strategy and plans will ensure a clear focus which will optimise
council buildings to ensure they are suitable.
An Estates Strategy Review has been undertaken and is due to
report to Executive Committee in June 2026.  This will identify
assets to be retained, along with required investment and also
identify assets which are considered surplus or suitable for
disposal.
CORP Percentage internal floor 88.90% 90.30% 90.30% 90.30% Performance has remained the same as last year.
24

Page 25

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
-ASSET02 area of operational
buildings in satisfactory
condition
Despite the current financial climate and reduced funding to
Scottish Local Authorities the figures show that, through
programmes of prioritised capital investment and preventative
maintenance, performance remains positive for the majority of
categories of property.
Through the asset management process and discussions with
services on
the opportunities to reduce the number of assets we continue to
work towards achieving a sustainable core estate. It is
anticipated that the Estates Review will lead to further changes
to the asset base.
Corporate Services CORP01 Support services as a
percentage of total
gross expenditure
3.90% 4.10% 3.40% 4.00% There has been a small decrease in the cost of support as a
percentage of total budget – this is a combination of a decrease
in support costs and an increase in the total budget. These result
in an overall minor decrease in the percentage.
CORP03b The percentage of the
highest paid 5%
employees who are
women
59.60% 62.30% 62.00% 60.30% The number of women within the Top 5% earners has slightly
decreased from the previous period.  This is due to a higher
number of female employees who were previously within the 5%
threshold either terminating their employment, flexibly retiring or
reducing their hours compared with their male counterparts.
Actions:  We will continue to monitor pay gap information and
take action as required.
CORP03c The gender pay gap 3.20% 2.70% 1.50% 1.30% Performance has improved in 2024–25 through continued
monitoring of pay and grading and taking appropriate action to
address inconsistencies.  This includes job evaluation exercises
which have resulted in improved rates of pay for some female
employee groups.
Actions: We will continue to monitor gender pay gap information
and act as required.  We continue to plan and implement
improvements in partnership with trade union representatives in
line with the principles of ‘Delivering a fairer future’.
CORP04 The cost per dwelling of
collecting Council Tax
£6.72 £6.57 £6.23 £5.98 The cost of collecting council tax per dwelling in 2024-25 has
decreased compared to 2023-24 due to an increase in
chargeable properties. However, this is more expensive than the
Scottish average with the use of e-billing by some councils likely
to have reduced their cost of collection.
25

Page 26

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Actions: The cost of collecting council tax will continue to be
managed closely through regular monitoring and reporting of
expenditure in this area.
CORP06a Sickness absence days
per teacher
7.40 8.00 8.60 7.80 The number of days lost due to sickness has increased
compared to 2023-24 due to an increase in long term and
short-term absences.
Throughout the year, the absence rates were higher than the
previous year, apart from May and July, which both recorded a
decrease.
Actions: There is a cross-council focus on improving absence
levels. Case management discussions between managers and
Personnel ensure actions are being progressed appropriately.
It is hoped that performance will improve given the actions in
place around recruitment (Delivering a fairer future etc).
CORP06b Sickness absence days
per employee (non
teacher)
13.90 14.40 15.50 14.50 The number of days lost due to sickness has increased
compared to 2023-24 due to an increase in long term absences.
Throughout the year, the absence rate was higher than the
previous year apart from July and August which reported a
decrease.
Actions: There is a cross-council focus on improving absence
levels. Case management discussions between managers and
Personnel ensure actions are being progressed appropriately.
It is hoped that performance will improve given the actions in
place around recruitment (Delivering a fairer future etc).
CORP07 Percentage of income
due from Council Tax
received by the end of
the year
97.00% 96.40% 96.40% 95.50% The percentage of income due from Council Tax in 2024-25 has
increased. South Lanarkshire’s performance continues to be
better than the Scottish average.
Actions: Work to maximise council tax income collection will
continue, utilising all available recovery methods.
CORP08 Percentage of invoices
sampled that were paid
within 30 days
91.80% 94.20% 93.20% 93.10% The reduction in the volume of invoices included in the PI relates
to the significant number of invoices processed early in March
2024 due to the migration to Oracle Fusion and some
realignment of the invoices within scope of the PI due to
improved categorisation.
Although processing performance reduced compared with the
previous year, this exceeds the performance target of 92.5% and
26

Page 27

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
is considered a positive outcome for the first processing year of a
new financial management system.
CORP09 % of Crisis Grant
decisions within 1 day
97.80% 98.20% 99.30% 96.00% Improved processing performance in 2024-25 compared to
2023-24. South Lanarkshire Council continues to perform better
than the Scottish average.
Actions: Work will continue in 2025-26 to explore ways to
improve processing times.
CORP10 % of Community Care
Grant (CCG) Grant
Decisions within 15
days
97.80% 96.30% 99.10% 90.70% Processing performance has improved in 2024-25 compared to
2023-24, performance is excellent and well above the Scottish
average.
Actions: Work will continue in 2025-26 to explore ways to
improve processing times.
CORP11 The percentage of
Scottish Welfare Fund
(SWF) Budget Spent
168.40% 131.80% 121.40% 120.60% The decreased proportion of SWF expenditure in 2024-25 when
compared to 2023-24 was due to the additional discretionary
funding allocated by the Council to the SWF from Scottish
Government. This additional funding was available in 2024/25
but due to the timing of when it was paid we carried forward 998k
to reserves to be used in 2025/26 and 2026/27.
Actions:  The administration of the SWF will continue to be
monitored closely and reported on a regular basis to ensure
effective financial management of the fund.
CORP12 The percentage of
Discretionary Housing
Payments (DHP)
Funding Spend
104.80% 109.00% 105.00% 99.00% South Lanarkshire continues to spend the budget it receives with
performance well above the Scottish average.
Actions:  The administration of DHP funding will continue to be
monitored closely and reported on a regular basis to ensure
effective financial management of the fund.
Culture & Leisure
Services
C&L01 Cost per attendance at
sports facilities
£4.75 £4.05 £4.28 £3.77 Costs per attendance at sports facilities increased in 2024/25 in
comparison with 2023/24 and is higher (worse than) the Scottish
average.
As a consequence of long-term maintenance issues in our sports
facilities which restricted the swimming pool lesson programme
and bookable spaces for events and classes, there was a drop in
attendance of 5.4% that affected costs per attendance at sports
facilities.
C&L02 Cost per library visit £3.82 £2.44 £2.93 £2.71 Costs per library visit increased in 2024/25 in comparison with
27

Page 28

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
2023/24 and this is higher (worse than) the Scottish average.
Services were realigned in the library service during 2024/25.
This has reduced the number of library buildings and will deliver
a more cost effective service delivery going forward.
C&L03 Cost of museums per
visit
£2.61 £1.71 £1.61 £4.20 Museum attendance increased in 2024/25 when compared with
2023/24, particularly virtual visits as more customers access
services online. This has helped to keep costs per visit low. The
2024/25 costs were lower than in 2023/24 and significantly lower
(better than) the Scottish average.
C&L04 Cost of parks and open
spaces per 1,000
population
£32,304 £26,732 £23,007 £22,388 The cost of parks and open spaces decreased significantly in
2024/25 when compared with 2023/24, and our ranking improved
accordingly, although the cost remains slightly above (worse
than) the Scottish average.
The service continues to operate to a high specification on
service delivery. This has also been supplemented with the
additional spending on the Frontline First programme which has
resulted in an increase in environmental improvements across
South Lanarkshire.
C&L05a Percentage of adults
satisfied with libraries
66.30% 69.00% 68.70% 65.30% There has been a very small decrease (less than 1%) in the
percentage of adults satisfied with libraries in 2024/25 in
comparison with 2023/24; the percentage remains well above
(better than) the Scottish average, and above the average for the
‘family grouping’.
Residents completing the household survey may not be users of
our services and are giving a perceived view, rather than based
on actual experience.
SLLC conducted a customer satisfaction survey throughout
2024/25 to assess actual service delivery and concluded an
overall satisfaction rate of 94% (combined score for value for
money / cleanliness / quality of services and equipment).
Customers have consistently rated library services highly.
C&L05b Percentage of adults 86.70% 86.30% 83.30% 83.70% Adults satisfied with parks and open spaces within South
28

Page 29

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
satisfied with parks and
open spaces
Lanarkshire in 2024/25 has dropped in comparison with 2023/24
and is now very slightly below (worse than) the Scottish average.
It is anticipated that satisfaction with parks and open spaces will
increase based on the works being undertaken as part of the
delivery of Frontline First.
C&L05c Percentage of adults
satisfied with museums
and galleries
66.30% 70.70% 70.00% 67.00% There was a very small drop in satisfaction with museums and
galleries in 2024/25, when compared with 2023/24; however the
percentage remains above (better than) the Scottish average
and above the average for the ‘family grouping’.
Residents completing the household survey may not be users of
our services and are giving a perceived view, rather than based
on actual experience.
SLLC conducted a customer satisfaction survey throughout
2024/25 to assess actual service delivery and concluded an
overall satisfaction rate of 94% (combined score for value for
money / cleanliness / quality of services and equipment).
Customers have consistently rated our museum services highly
for several years.
C&L05d Percentage of adults
satisfied with leisure
facilities
69.70% 66.70% 66.30% 65.00% There has been a very small reduction in the percentage of
adults satisfied with leisure facilities in comparison with 2023/24;
however South Lanarkshire remains above (better than) the
Scottish average, and 6.5% above the average for the ‘family
grouping’.
Residents completing the household survey may not be users of
our services and are giving a perceived view, rather than based
on actual experience.
SLLC conducted a customer satisfaction survey throughout
2024/25 to assess actual service delivery and concluded an
overall satisfaction rate of 94% with our leisure facilities
(combined score for value for money / cleanliness / quality of
29

Page 30

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
services and equipment).  Customers have consistently rated our
leisure services highly for several years.
Economic
Development
ECON01 Percentage of
unemployed people
assisted into work from
council funded/operated
employability
programmes
12.90% 11.30% 13.40% 20.60% South Lanarkshire has achieved a year-on-year increase in the
percentage of unemployed people assisted into work from
council funded/operated employability programmes; however, it
is noted that the Scottish average has increased significantly and
as a result, the South Lanarkshire figure is lower than the
Scottish average.
The employability programmes in South Lanarkshire are focused
on the people furthest away from the labour market.
ECON02 Cost of planning and
building services per
application
£5,710.00 £5,794.00 £4,994.00 £7,353.00 The cost of planning and building standards services per
application has declined in 2024/25 when compared with
2023/24 and is below (better than) the Scottish average.
ECON03 Average time per
business and industry
planning application
(weeks)
22.90 Wks 16.00 Wks 12.70 Wks 14.30 Wks The average time per business and industry planning
applications is considerably less in 2024/25 when compared with
2023/24 and is lower (better) than the Scottish average.
The Service will seek to continue this three year improvement
trend.
ECON04 Percentage of
procurement spend on
local enterprises
18.1% 19.5% 25.0% 30.8% The percentage of procurement spend on local enterprises in
2024/25 shows a continued upward trend in comparison with
2023/24. While the figure is still below (worse than) the Scottish
average, it should be noted that this national average is skewed
by the more rural and island local authorities where there is a
greater reliance on local suppliers.
ECON05 No of business gateway
start-ups per 10,000
population
16.00 12.70 21.70 12.30 The number of business gateway start-ups rose significantly in
2024/25 in comparison with 2023/24 and is higher (better) than
the Scottish average.
Business Gateway was brought “in-house” in partnership with
North Lanarkshire, coming into effect in March 2024.
ECON06 Investment in Economic
development and
Tourism per 1,000
population
£72,841 £60,418 £79,565 £134,081 Investment in Economic development and Tourism in 2024/25 is
significantly higher than in 2023/24; however it is still
considerably lower (worse than) the Scottish average. We have
however approved a different approach to Inward Investment
30

Page 31

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
which will hopefully continue to see improvements over time.
Business grants and tourism funding have reduced year on year
from a high point which coincided with Scottish Government
Covid-19 grant funding.
ECON07 Percentage of people
earning less than the
living wage
10.00% 10.60% 13.50% 11.30% The percentage of people earning less than the living wage
increased in 2024/25 in comparison with 2023/24. This is higher
(worse) than the Scottish average.
The council leads a pan-Lanarkshire living wage campaign group
which aims to increase the number of employers signing up to
the Living Wage Pledge.
ECON08 Percentage of
properties receiving
superfast broadband
97.60% 98.30% 99.20% 97.10% In 2024/25, there was an increase in properties in South
Lanarkshire with access to high-speed broadband and speeds
greater than 30 Mbps. This figure continues to rise slowly and
remains above the Scottish average for 2024/25.
Most of the properties not yet able to access high speed
broadband are located within rural areas and are isolated groups
of a few properties. These properties are either included within
the Scottish Government's Reach 100% (R100) investment
programme and projected to receive full fibre connection by the
end of 2028, or are too difficult or expensive to connect to an
existing network, and are therefore eligible for the Scottish
Broadband Voucher Scheme to help find alternative solutions.
ECON09 Town vacancy rates 14.00% 14.80% 14.90% 11.40% In 2024/25 the Town vacancy rate increased slightly in
comparison with 2023/24 and remains above (worse than) the
Scottish average.
This is substantially influenced by the major changes happening
in East Kilbride and Hamilton Town Centres which seek to
consolidate retail and realise other opportunities for the town
centres including residential development. The rest of our towns
continue to perform well with the majority showing vacancy rates
at or below the national average.
ECON10 Immediately available
employment land as a
% total land allocated
12.10% 12.10% 12.10% 21.30% The 2024/25 figure is the same as in 2023/24 and remains below
(worse than) the Scottish average, however our ranking in
comparison with other local authorities has improved.
31

Page 32

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
for employment
purposes in the local
development plan
The percentage of immediately available employment land has
been recognised as a challenge which needs to be considered in
the drafting of Local Development Plan 3 (LDP3). This work is
underway and through the call for sites process it is anticipated
the position can be addressed.
ECON11 Gross Value Added
(GVA) per capita
£20,624 £22,838 ------ ------ Data not yet available
ECON12a Claimant Count as % of
Working Age Population
3.2% 2.8% 2.6% 3.0% The figure for 2024/25 has improved in comparison with 2023/24
and is lower (better) than the Scottish average.
ECON12b Claimant Count as % of
16-24 Population
3.50% 3.50% 3.30% 3.40% The figure for 2024/25 has improved in comparison with 2023/24
and is lower (better) than the Scottish average.
Environmental Services ENV01a Net cost of waste
collection per premise
£88.16 £92.46 £83.48 £77.81 The net cost of waste collection per premises in South
Lanarkshire decreased in 2024/25 when compared with 2023/24.
However, it is still higher (worse) than the Scottish average.
The high costs reflect the council’s position in 2024/25 to provide
a range of services free of charge to residents. At that time,
unlike most councils in Scotland, South Lanarkshire offered each
household a free bulk uplift in each financial year. There was
also no charge for garden waste bin collections. These charges
are becoming increasingly more common in Scotland and allow
councils who implement a charge to offset collection costs.
Charges for bulk uplifts and garden waste permits came into
effect from 1 April 2025 and it is therefore anticipated that
performance against this indicator will improve going forward.
ENV02a Net cost of waste
disposal per premise
£106.24 £125.99 £116.02 £105.19 The net cost of waste disposal per premise in South Lanarkshire
decreased significantly in 2024/25 when compared with 2023/24;
however it remains above the Scottish average.
This reflects the fact that the council does not send
non-recyclable waste to landfill.  Costs to thermally treat
non-recyclable waste are higher than sending the material to
landfill. In 2024/25, this meant that the council had a higher
landfill diversion rate than local authorities that were still in the
32

Page 33

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
process of procuring a solution to the ban on the landfilling of
biodegradable municipal waste.
ENV03a Net cost of street
cleaning per 1,000
population
£19,632.00 £18,863.00 £17,507.00 £17,616.00 The costs associated with street cleaning operations reduced
significantly in 2024/25 when compared with 2023/24 bringing
the figure below (better than) the Scottish average.
The costs associated with South Lanarkshire street cleaning
operations are: graffiti removal, street cleaning, fly tipping uplift,
fly posting removal, blood spills, hypodermic needle uplift, dead
animal uplift and both the large and smaller mechanical
sweeping fleet that we utilize.
Implementation of the Litter Strategy, approved in 2022, is
continuing to have an environmental impact, and it is anticipated
that this will result in a subsequent decrease in spending across
the area going forward.
ENV03c Street cleanliness score 92.30% 91.60% 92.90% 91.70% The South Lanarkshire street cleanliness score in 2024/25 is
higher than (better than) the 2023/24 figure and the Scottish
average for 2024/25.
This can be attributed to the implementation of the Litter
Strategy.
ENV04a Cost of roads per
kilometre
£17,762.00 £18,429.00 £14,378.00 £13,226.00 Spending per kilometre of road in 2024/25 has seen a decrease
compared to 2023/24. The spending figure varies year on year
and can be influenced by factors such as the level of City Deal
project spend and other capital works.
In 2024/25, South Lanarkshire is the 16th highest investing local
authority per kilometre of road. The level of spend in South
Lanarkshire remains higher than the Scottish average, reflecting
the council’s decision to continue to invest in our road network.
Previous high levels of construction inflation reduced the length
of road network that can be resurfaced / repaired on an annual
basis – however it is anticipated that the combination of
sustained investment and effective asset management will lead
to stabilisation of our road network, with a modest yet steady
33

Page 34

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
improvement achievable in the years ahead.
ENV04b Percentage of A Class
roads that should be
considered for
maintenance treatment
23.9% 24.9% 27.7% 31.0% There has been a significant decline in the condition of A-class
roads in South Lanarkshire.
Previous high levels of construction inflation reduced the length
of road network that can be resurfaced / repaired on an annual
basis – however it is anticipated that the combination of
sustained investment and effective asset management will lead
to stabilisation of our road network, with a modest yet steady
improvement achievable in the years ahead.
It should be noted the condition of the A Class network in South
Lanarkshire remains lower (better than) the Scottish average.
ENV04c Percentage of B Class
roads that should be
considered for
maintenance treatment
26.1% 27.8% 29.6% 35.0% There has been regression in the condition of B class roads in
South Lanarkshire; however their condition remains substantially
better than the Scottish average.
Previous high levels of construction inflation reduced the length
of road network that can be resurfaced / repaired on an annual
basis – however it is anticipated that the combination of
sustained investment and effective asset management will lead
to stabilisation of our road network, with a modest yet steady
improvement achievable in the years ahead.
ENV04d Percentage of C Class
roads that should be
considered for
maintenance treatment
35.6% 36.5% 37.4% 34.0% The C class road network is fully surveyed every four years and
during the survey period 2023/25 we observed a regression in its
condition compared to the previous year; and the condition falls
below (worse than) the Scottish average.
The road surfacing decision making process in South
Lanarkshire takes account of road category and as a result a
greater level of investment is targeted towards our more strategic
road network (A Class). Previous high levels of construction
inflation also reduced the length that can be resurfaced /
repaired on an annual basis – however it is anticipated that the
combination of sustained investment and effective asset
management will lead to stabilisation of our road network, with a
modest yet steady improvement achievable in the years ahead.
ENV04e Percentage of U 31.60% 32.60% 32.40% 36.00% Unclassified roads make up a sizeable proportion of the road
34

Page 35

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
(unclassified) roads that
should be considered
for maintenance
treatment
network in South Lanarkshire.
In 2024/25, it is noted that there has been a slight
improvement/stabilisation in condition and it is considerably
higher than the Scottish average.
ENV05a Cost of Trading
Standards, Money
Advice & Citizen Advice
per 1,000 population
£3,088.00 £3,403.00 £3,003.00 £7,220.00 The cost of Trading Standards per 1,000 population decreased in
2024/25, compared to 2023/24, due to difficulties in recruiting
fully qualified officers and continues to remain well below (better
than) the Scottish average.
Despite costs being below the Scottish average, the service
provides a good level of protection for local consumers.
ENV05b Cost of environmental
health per 1,000
population
£12,900.00 £12,122.00 £11,280.00 £13,779.00 The cost of Environmental Health per 1,000 population
decreased in 2024/25, compared to 2023/24, due to difficulties in
recruiting fully qualified officers and continues to remain well
below (better than) the Scottish average.
Despite costs being below the Scottish average, the service
provides a good level of public health protection for local
communities.
ENV06 The percentage of total
household waste arising
that is recycled
41.10% 41.00% 40.70% 44.30% The percentage of total household waste that was recycled
decreased slightly in 2024/25 when compared with 2023/24 and
remains below (worse than) the Scottish average.
Multi-occupancy properties (flatted developments) make up over
30% of housing stock in South Lanarkshire. The lack of space at
these properties means opportunities to provide recycling
services are limited. Moreover, when recycling bins are provided,
often the only option is to provide large communal bins, where
contamination rates are significantly higher.
South Lanarkshire is one of the few councils to still provide a
fortnightly residual waste collection, meaning residents have a
minimum of 120L of residual waste capacity each week. It is
understood that recycling rates are lower when households
receive more residual waste capacity.
35

Page 36

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Waste Services are working closely with colleagues in Housing
Services with regard to improving our recycling figures. Through
additional funding we procured additional communal recycling
bin with Perspex sides, which allows residents to see the waste
streams and hopefully encourages greater participation. We
have secured additional funding through Extended Producer
Responsibility (EPR) monies, and an extra 182 perspex sided
bins will be procured which will then be rolled out to more flatted
properties. Where we have contamination issues,
communications are being carried out in partnership with
Housing colleagues to discourage and advise on the correct
means of waste disposal.
ENV07a Percentage of adults
satisfied with refuse
collection
85.30% 86.00% 85.30% 78.30% The percentage of adults satisfied with refuse collection is taken
from the Scottish Household Survey. The figure for 2024/25
shows a slight decrease on 2023/24; however South Lanarkshire
is still higher than the Scottish average.
ENV07b Percentage of adults
satisfied with street
cleaning
61.70% 62.30% 57.30% 57.00% The percentage of adults satisfied with street cleaning for
2024/25 is lower than in 2023/24, however South Lanarkshire
remains just above the Scottish average.
Given the improvement in the Street Cleanliness score and
implementation of the Litter Strategy it is anticipated that
satisfaction with street cleaning will improve.
Financial Sustainability FINSUS01 Total useable reserves
as a % of council annual
budgeted revenue
22.00% 19.60% 14.50% 19.30% The council has seen a decrease in useable reserves as a
percentage of council budget. This reflects a decrease in the
level of useable reserves (significantly as a result of reserves
used in the 2024/2025 budget to support the Council's financial
strategy) and an increase in the council’s annual expenditure
budget, meaning that arithmetically, the percentage of useable
reserves to annual budget decreases.
The important factor to consider is the purpose and use of
reserves, and the fact is that the council is clear on what
reserves we have, and the purpose of them. The use of Service
Concession and Superannuation Reserves will affect the figures
for the next few years as they are used to support the council's
financial strategy. The key factor is that the reserves are
36

Page 37

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
sufficient.
FINSUS02 Uncommitted General
Fund Balance as a % of
council annual budgeted
net revenue
1.50% 1.40% 1.30% 1.90% The value of the Council’s Uncommitted General Fund balance
has not changed from 2019/2020. The council's budget has
increased therefore resulting in a minor decrease in the
percentage.
This is very much an arithmetic impact. Our uncommitted
balance has not changed, but the budget has changed due to
external factors including government grant ringfenced for
specific purposes. The council’s position on reserves is included
in the Revenue Budget Strategy.
FINSUS03 Percentage of Financing
Costs to Net Revenue
Stream- General Fund
5.00% 3.70% 4.80% 6.00% This ratio shows an increase in the General Fund’s ratio of
financing costs to net revenue stream. The overall increase
reflects an increase in financing costs mainly due to a change in
how we account for the council’s schools PPP project. The
position reflects the product of strategic, sustained capital
investment in schools and roads over more than twenty years.
FINSUS04 Percentage of Financing
Costs to Net Revenue
Stream- Housing
Revenue Account
17.20% 7.70% 9.30% 20.70% This ratio shows an increase in the HRA’s ratio of financing costs
to net revenue stream. The overall increase reflects an increase
in loan charges from the profiling of repayments as part of the
HRA Loans Fund Review.
The position reflects the product of strategic, sustained capital
investment in the council’s housing stock.
FINSUS05 Actual outturn as a
percentage of budgeted
expenditure
100.00% 100.00% 100.00% 100.10% The outturn reflects that the council reported a breakeven
position after all transfers to reserves. The SLC position is
consistent across years, but movement in other councils' figures
may result in a change to our ranking going forward.
FINSUS06 Reliance on Reserves
as a % of Net
Expenditure
3.90% 6.10% 0.30% 0.60% The council has seen a decrease in reliance on reserves as a
percentage of net expenditure budget. This reflects a decrease in
the level of reserves utilised in the 2024/2025 budget to support
the Council's financial strategy (compared to the previous year)
and an increase in the council’s net expenditure budget.
The important factor to consider is the purpose and use of
reserves, and the fact is that the council is clear on what
reserves we have, and the purpose of them. The use of Service
Concession and Superannuation Reserves will affect the figures
for the next few years as they are used to support the council's
37

Page 38

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
financial strategy. The key factor is that the reserves are
sufficient.
Housing Services HSN01b Gross rent arrears (all
tenants) as at 31 March,
as a percentage of rent
due for the reporting
year
8.70% 8.00% 7.10% 8.60% Resource target achieved and significantly lower than Scottish
average.
The strong performance has been secured despite the financial
pressures which tenants continue to face due to the economic
situation.
A range of supports measures continue to assist tenants facing
financial hardship. The Council continues to set affordable rents
and provide advice.
Performance continues to be routinely monitored with a focus on
continuous improvement.
HSN02 Percentage of rent due
in the year that was lost
due to voids
0.60% 0.50% 0.40% 1.70% Performance this year has improved compared to the previous
two years. The Resource continues to focus on void
management to minimise void rent loss with a number of
improvement actions identified.
Performance in this area has been consistently among the best
in Scotland compared to other Local Authorities. In the past three
years we have been the second lowest void rent loss and well
below the Scottish average.
HSN03 Percentage of dwellings
meeting Scottish
Housing Quality
Standards
79.70% 83.60% 88.70% 82.90% While performance improved in the year and is above the
Scottish average it continues to remain below the position
reported in 2020/21 before the standard was revised to include
Fixed Electrical Testing and installation of combined smoke and
carbon monoxide alarms. This trend was evident across other
local authorities with the Scottish average also decreasing.
A revised process is in place to improve access to properties to
carry out the necessary work /installations.
We continue to engage with the Scottish Housing Regulator on a
monthly basis.
HSN04b Average number of days
taken to complete non
emergency repairs
11.60 days 14.50 days 13.00 days 10.10 days Performance in this area has improved and although above the
Scottish average, this is viewed positively because it is based on
an appointment-based system that is supported by tenants and
tenants’ representatives.
38

Page 39

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Improvement activity within the repairs service continues in
2025-26 to support the reduction of the average time taken
although the councils focus will continue to be on quality rather
than speed of service.
HSN05a Percentage of council
dwellings that are
energy efficient
------ ------ 0.00% ------ Measure suspended as government reviews standards.
The 2025 and 2032 EESSH Milestones have been suspended as
the Scottish Government are reviewing the EESSH2 standards to
strengthen and realign the standard with the target for net zero
heat in houses from 2045.
Social Work Services SW01 Home Care costs per
hour for people aged 65
or over
£31.52 £38.47 £35.48 £32.54 In 2024–25, the hourly cost of providing care at home to
individuals aged 65 and over in South Lanarkshire decreased.
Whilst it remains above the national average ranking adjusted
from 16 to 17.  These figures reflect the wide range of services
included in Home Care provision, which covers support delivered
by council staff as well as services purchased from other
councils, private providers, and voluntary organisations.
Care costs vary across Scotland, with weekly costs among South
Lanarkshire’s peer councils differing by over £30 per hour
between the lowest and highest costing areas. The costs
associated with South Lanarkshire’s Care at Home services are
influenced by the 2022/23 job evaluation for frontline staff. This
evaluation has led to increased spending due to higher frontline
salaries, while also improving service quality and inspection
grades.
Conversely, payments to other providers are lower, impacted by
factors such as inflation, rising living costs, and adjustments to
the living wage which creates sustainability challenges. The
Procured Services Arrangement (PSA), introduced in July 2024,
has had an impact in reducing the commissioning of
unnecessary hours and focusing enhanced rates in rural and
hard-to-reach areas.
Action: Levels of efficiency and performance of intermediate care
and care at home services are scrutinised weekly by senior
managers and at the Joint Locality Quarterly Performance
Review.
39

Page 40

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
Expected to Improve? Whilst efficiencies in service continue to
be achieved, in terms of LGBF comparators, South Lanarkshire
costs are likely to remain higher than other council areas as a
result of the job evaluation and increases in inflation, cost of
living, and the living wage.
SW02 Self Directed Support
(Direct payments and
managed personalised
budgets) spend on
adults 18+ as a
percentage of total
social work spend on
adults 18+
6.40% 6.40% 7.10% 9.40% In 2024–25, South Lanarkshire spent 7.1% of its adult social
work budget through Self Directed Support (SDS) Options 1 and
2. This is an increase from 6.4% in previous year and South
Lanarkshire’s national ranking remains steady at 15. The
national benchmark has risen less significantly, from 9% to 9.4%
in the same period.
Options 1 and 2 give people more choice and control over their
support by allowing them to manage their own budget or have a
personalised budget managed on their behalf. These figures do
not include Option 3, where the council arranges services
directly. Option 3 remains an important and valid choice for many
people, especially where managing a budget or employing staff
is not the right fit.
South Lanarkshire was selected as the 2025 host area for the
Working Together for Change (WTFC) programme, recognising
the area’s strong commitment to improvement and collaborative
working across services and partners. Delivered by In Control
Scotland—a national charity funded by the Scottish
Government—the programme brings together supported people,
carers, and professionals to deepen understanding of SDS
legislation and identify opportunities to strengthen local practice.
Five priority change themes have been identified to enhance
SDS delivery in South Lanarkshire.
Action: Social Work and Take Control have engaged with
employability services, local colleges, and Strathclyde University
to promote PA vacancies in the South Lanarkshire area to
individuals who are interested in pursuing a career in social
work/social care. Work is ongoing to upskill the workforce in
relation to promoting Options 1 and 2 and ensuring that the right
information is available in relation to the benefits and the
40

Page 41

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
challenges. Similarly, work continues in relation to improving
public-facing information in relation to all the SDS options.
Expected to improve? Yes, however it should be noted that wider
pressures, most notably in relation to workforce supply and the
financial challenges facing social care, will continue to be
influential.
SW03a Percentage of people
aged 65 and over with
long-term care needs
receiving personal care
at home
61.00% 62.00% 63.00% 62.00% South Lanarkshire’s performance in 2024–25 has risen slightly to
63%, up from 62% in 2023–24. This keeps the area broadly in
line with the Scottish benchmark of 62%, and South
Lanarkshire’s national ranking remains steady at 15. Within
South Lanarkshire’s comparison group of similar councils, South
Lanarkshire has a lower percentage compared to 64.6% average
amongst the family group.
While performance is stable, it is important to note that this
indicator does not include individuals who have been assessed
and are waiting for a service. At present, this group represents
an estimated 1,000–1,500 hours of unmet need each week,
which is not reflected in the reported figure.
The gradual increase reflects the growing needs of an ageing
population and rising demand for personal care supports.
Blantyre Life intermediate care and Home Assessment Teams
have contributed positively by helping people regain or maintain
independence after periods of ill health. These services play a
key role in supporting individuals to learn or relearn daily tasks,
reducing reliance on long-term services where possible.
Action: Home Assessment Teams has played a significant role in
maximising the independence of service users by supporting
people through reablement and rehabilitation following a period
of ill health.
Expected to improve? Yes, the impact of Blantyre Life and Home
Assessment Team (HAT) service model continue to impact
positively on flow and capacity.
SW04b Percentage of adults
supported at home who
agree that their services
------ 63.30% ------ ------ Figures published biennially - next results due 2025-26
41

Page 42

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
and support had an
impact in improving or
maintaining their quality
of life
SW04c Percentage of adults
supported at home who
agree that they are
supported to live as
independently as
possible
------ 67.20% ------ ------ Figures published biennially - next results due 2025-26
SW04d Percentage of adults
supported at home who
agree that they had a
say in how their help,
care or support was
provided
------ 55.40% ------ ------ Figures published biennially - next results due 2025-26
SW04e Percentage of carers
who feel supported to
continue in their caring
roles
------ 28.10% ------ ------ Figures published biennially - next results due 2025-26
SW05 Residential cost per
week per resident for
people aged 65 or over
£736.00 £742.00 £676.00 £732.00 South Lanarkshire’s average weekly cost of providing residential
care for older people decreased in 2024–25 and is now below
the national average. South Lanarkshire’s position compared
with other councils has remained variable moving from 19 to 13
ranking.
Care costs vary widely across Scotland. This is because each
area has different levels of need, different local demographics,
and different contributions made by people who use services all
of which influence performance. Within South Lanarkshire’s
comparison group of similar councils, the weekly cost of
residential care for people aged 65 and over can differ by more
than £500 between the lowest and highest cost areas. National
increases to the care home rate also influence results.
Action: Due to the variability of this measure, there are no
specific actions that will be taken to impact on costs.
Expected to improve? Local demographics and contributions will
42

Page 43

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
determine future movement and ranking.
SW06 Rate of readmissions to
hospital within 28 days
per 1,000 discharges
99.90 95.60 98.00 102.80 South Lanarkshire’s rate of hospital readmissions has risen
slightly in 2024–25, compared with the previous year and ranking
shifted from 13 to 18. Readmissions may be for a variety of
reasons with a frail and older population, however, despite this
increase, South Lanarkshire continues to perform better than the
national benchmark and family group comparator average.
Performance across the six priority areas of the Health and
Social Care Delivery Plan is monitored monthly and formally
reported each quarter to the Social Work Committee and the
Integration Joint Board.
The Hospital Social Work teams work alongside clinical
colleagues to support a safe and timely discharge planning
process, ensuring people are given the support that they need
on discharge. The intermediate care unit within Blantyre Life
plays a key role in supporting recovery and improving patient
flow as a step down option. Whilst Home Assessment Teams
offer support to people within their own home, offering short term
reablement support to regain independence over a six week
period and enabling safe discharge from hospital.
Action: Hospital Social Work teams will continue to support the
discharge planning processes, whilst local community services
will work with acute sites to maintain capacity and support flow.
Expected to improve? Yes, however wider pressures, most
notably in relation to workforce supply and the financial
challenges facing social care, will continue to be influential.
SW07 Percentage of care
services graded 'good'
or better in Care
Inspectorate Inspections
77.00% 79.90% 80.10% 81.90% In South Lanarkshire, the percentage of care services inspected
in 2024–25 increased from 2023–24. The national average has
risen more sharply, resulting in South Lanarkshire’s ranking
moving from 17 to 23.
This data includes care provision provided by other organisations
in the local authority area and is not limited to Council registered
services only. As not all services are inspected annually, services
keep their grades until they are inspected again.
The Council is responsible for 30 registered in-house care
services.  On review of the last datastore information (December
43

Page 44

Local Government Benchmarking Framework Results
South Lanarkshire Council LGBF Results 2024/25
Service LGBF Ref Description
2022/23
Results
2023/24
Results
2024/25
Results
Result
Trend
Scotland
2024/25
Scottish
Average
Comparison
with
Scotland:
better or
worse?
Comments/Progress
2025), all 30 in house care services were graded 4 or above
across all six key questions.  The percentage of internal care
services graded 'good' or better is 100%.
Action: Quality and governance arrangements will remain at the
forefront of South Lanarkshire care services. Inspection
outcomes are monitored and reported biannually to both Social
Work Resources Committee and South Lanarkshire University
Health and Social Care Partnership Integration Joint Board.
Expected to improve? Yes. Current figures indicate improvement
in relation to this measure.
SW08 Number of days people
spend in hospital when
they are ready to be
discharged, per 1,000
population (75+)
1,005.00 931.00 988.00 899.00 In 2024–25, the average number of days people in South
Lanarkshire spent in hospital when they were ready to be
discharged increased and ranking shifted from 19 to 22.
Although the national figure also increased, South Lanarkshire
remains above the Scottish average.
Steps have been taken to improve discharge planning, including
a successful pilot in the Frailty Assessment Unit (FAU) at
University Hospital Hairmyres, which will be extended to
University Hospital Wishaw.  Staff continue efforts to reduce
discharge cancellations and promote adherence to agreed
discharge planning processes to help reduce loss of capacity
within the system.
Action: Hospital Social Work teams will continue to support the
discharge planning processes, whilst local community services
will work with acute sites to maintain capacity and support flow.
Expected to improve? Yes. To improve patient flow across
Lanarkshire hospital sites, the Hospital Social Work team will
support acute staff with early identification of patients within
frailty units who are assessed as requiring support for discharge.
However other factors including patient demographics and
clinical decision making will also influence performance, along
with other pressures including the financial challenges facing
social care.
44

Page 45

Appendix 2 
Family Group: graphs for indicators where SLC results are below the Scottish average 
FAMILY GROUPS 
For indicators relating to Children, Social Work and Housing services, councils with
similar levels of deprivation are grouped together. South Lanarkshire’s family group
for these indicators is: 
• Clackmannanshire 
• Dumfries & Galloway 
• Falkirk 
• Fife 
• Renfrewshire 
• South Ayrshire 
• South Lanarkshire 
• West Lothian 
For indicators relating to Environmental, Culture & Leisure, Economic Development,
Corporate and Property services, councils with similar urban/rural profiles are
grouped together. South Lanarkshire’s family group for these indicators is: 
• Angus 
• Clackmannanshire 
• East Renfrewshire 
• Inverclyde 
• Midlothian 
• Renfrewshire 
• South Lanarkshire 
• West Lothian 
4
45

Page 46

Community and Enterprise Resources 
46

Page 47

47

Page 48

48

Page 49

49

Page 50

50

Page 51

Education Resources 
51

Page 52

52

Page 53

Finance and Corporate Resources 
53

Page 54

54

Page 55

Housing and Technical Resources 
55

Page 56

Social Work Resources 
56

Page 57

57

Page 58

58

Page 59

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 12 May 2026
Report by: Chief Executive  
Subject: Accounts Commission Audit of Best Value –
Aberdeenshire Council and Shetland Islands Council 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Forum of key messages and recommendations from recent reports
published by the Accounts Commission on Best Value
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendation(s):-
[]
(1) that the key messages and recommendations within the report be noted.
[1recs]
3. Background
3.1. Towards the end of 2023, the Accounts Commission introduced a new approach to
the Audit of Best Value to replace the Best Value Assurance Report (BVAR) regime
which had run from 2018 to 2023. 
3.2. The approach consists of brief Controller of Audit (CoA) reports accompanied by and
reflecting on published annual audit reports. These CoA reports are considered by
the Commission in public and reported publicly. 
3.3. The CoA reports are intended to offer a BV-focused reflection on the council’s
annual audit report.  In line with the previous practice of bringing BVAR findings to
the Forum to highlight good practice and place our own activities in context, the
findings from the recent CoA reports are summarised below. 
4. Aberdeenshire Council (published 25 March 2026)
4.1. Aberdeenshire Council receives a favourable report, with auditors commending the
council’s clear priorities, it’s commitment to community engagement, and strong
partnership working.  Some concerns are raised, however, about the council’s
budget gap and the need for clear plans setting out how the gap will be tackled.  The
Commission findings are: 
 Aberdeenshire Council’s Plan 2024–2029 sets out a clear vision for the area
and reflects the challenges created by its geography and projected
demographic trends, which will increase service demand and costs.  
5
59

Page 60

The clarity of its priorities, shaped through community and stakeholder
engagement, is notable given the council’s complex political landscape.
Continued collaboration between officers and elected members will be
essential, particularly in light of the £81.4m cumulative budget gap identified in
the Medium-Term Financial Strategy.  The importance of the council’s own
deadline of delivering savings and transformation plans by June this year
cannot be overstated, and we will observe the development of these plans with
close interest.
 The council is well governed, takes informed decisions, and performs strongly
in many areas. However, their projected budget gap is amongst the largest in
Scotland (as a percentage of their total revenue budget) and undelivered
savings in previous years mean it is vital for the council to set out more clearly
how it will bridge future budget gaps. We welcome the more specific savings
proposals identified for 2026/27, which will support clearer tracking and
reporting, and we look forward to the auditor’s assessment of this approach.
 Given demographic and other pressures, the council’s Transformation Strategy
is critical to long-term financial sustainability but relies on projects that deliver
financial and non-financial benefits. We endorse the auditor’s recommendations
around producing a more detailed transformation programme, and to
standardise governance and reporting across all transformation activity, with
clear performance information and milestones being developed. This will
strengthen members’ ability to monitor progress, risks and outcomes, essential
in the current and projected fiscal context.
 We commend the council’s strong commitment to community engagement in
setting priorities. This should continue as detailed transformation projects
develop, given the likely impact on service users and communities. The
council’s intention to produce locally informed ‘place’ plans is positive,
particularly given its size and diversity. We look forward to seeing how this
commitment will be supported going forward.
 We are encouraged by the council’s extensive partnership working, which
provides a strong platform for the future. However, to address its significant
financial challenges, the council should now prioritise partnerships that can
deliver meaningful transformation at local, regional or national level.
 We recognise that partnership working carries risks. The Ness Energy from
Waste project, jointly undertaken with Aberdeen City and Moray Councils, has
experienced contractual issues in 2025/26, creating financial and
service-delivery risks for all three authorities. Given the project’s scale and
importance, we ask the council to undertake and share a ‘lessons learned’
review.
 The Aberdeenshire Integration Joint Board (IJB) continues to represent a
financial risk to the council. We welcome the early identification of the funding
shortfall and the proactive joint work between the council, NHS Grampian and
the IJB to address this and although a gap remains, progress is positive. Amid
growing demographic pressures, the council and partners will need to balance
carefully their commitment to improving outcomes for service users with making
the necessary changes to ensure financial sustainability.  
60

Page 61

5. Shetland Islands Council (published 5 March 2026)
5.1. Shetland Islands Council receives a mixed report.  The council has a clear vision and
understanding of the key challenges it faces, and service performance is strong and
improving.  However, auditors note several areas of concern, including lack of a
strategic approach to achieving financial sustainability, the slow pace of
transformational change, and the need for a more coherent and strategic approach
to the adoption of digital technology. The Commission findings are: 
 We welcome the council’s clear vision for Shetland, shared with partners, and
its recognition of the area’s key challenges, including attracting people to live
and work on the islands. Engagement on its corporate plan and budget is
positive, but given significant projected budget gaps, it is essential that this
engagement is sustained to build ownership of future priorities and support
members in taking the difficult decisions that undoubtedly lie ahead.
 Shetland Islands Council is unique in its geography, income sources and strong
reserves position relative to other councils. Communities have benefitted from
strong and improving performance across a range of services, with satisfaction
levels among the highest in Scotland. This focus on maintaining service levels
and keeping council tax increases relatively low will be welcomed by Shetland’s
current residents but has been achieved by drawing on the council’s reserves
unsustainably over recent years, which will impact future generations if not
addressed.
 The latest Medium-Term Financial Plan (MTFP) forecasts a cumulative budget
gap of £134.3 million by 2029/30, underscoring the need for the ‘step change’
highlighted in the Controller’s report. The council must urgently prioritise
delivery of the ten actions identified to address even the most optimistic
scenario in its MTFP, in particular developing its medium to longer-term plan for
income and for sustainable reserves management. These actions should then
form the basis of a more strategic approach to achieving financial sustainability,
aligned with its Corporate Plan, Change Programme and Workforce Plan.
Critically, members and officers must commit to taking this more strategic
approach into the next electoral period and beyond.
 Since the council’s 2022 Best Value Assurance Report, we welcome
improvements in performance management arrangements. However, auditors
continue to highlight both the continued reliance on reserves and a lack of pace
in transforming services. We recognise that workforce capacity affects delivery
of its 21 Change Programme projects, but without detailed project plans, the
council cannot effectively prioritise its limited resources. We will seek
confirmation from auditors of more robust and realistic project planning and
prioritisation in the next annual audit report, given that it will then be four years
since we highlighted concerns around the pace of its Change Programme.
 While connectivity challenges may have slowed digital developments, it is
concerning that auditors find the council ‘at an early stage of digital adoption’
compared to others. Digital technology is critical to supporting the workforce
and delivering sustainable services. We urge the council to take a more
strategic and coherent approach to the adoption of digital technology across its
own services and pursue collaboration with partners locally and across local
government.  
61

Page 62

 Finally, we recognise the impact of Shetland’s population challenges on both
day-to-day service delivery and the council’s capacity to transform and
innovate. While attracting people to the islands remains a priority, the council
must deploy the staff it does have now as effectively as possible so updating its
overall Workforce Plan and service-level plans should remain a priority. We also
expect the council to ensure it has sufficient staff capacity to meet statutory
requirements. Completing its information governance review and updating key
governance documents in 2026 will provide stronger foundations for the future. 
6. Next Steps and Recommendations
6.1. Officers of the Council will continue to review the CoA reports as they are published
to learn any lessons for the Council. Reports on any significant findings and key
messages will be brought to the Forum for information. 
7. Employee Implications
7.1. There are no direct employee implications. 
8. Financial Implications
8.1. There are no direct financial implications. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
11.2. There is no requirement for consultation on the content of the report. 
Paul Manning
Chief Executive 
14 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
62

Page 63

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 12 May 2026
Report by: Executive Director (Finance and Corporate
Resources)  
Subject: Transformational Reviews – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Transformational Reviews that are part of the Council’s
Transformational Change Programme for the year 2025/2026 and beyond 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the update on the Transformational Reviews be noted.
[1rec
3. Background
3.1. In order to drive continuous improvement and efficiencies, and to support the
2025/2026 to 2027/2028 Revenue Budget Strategy, the Council embarked on a
programme of Transformational Change to manage the significant Budget Gaps facing
the Council over these 3 years.  The programme builds on the work undertaken over
many years, where service reviews have taken place and which have fed into the
savings options that Members have considered. 
3.2. The most recent update to this Forum on 24 February 2026 detailed the progress of
Cross-Cutting reviews, as well as Resource specific transformational reviews, to
identify savings in the year 2026/2027 and beyond.  That report identified savings of
£3.284 million from Reviews for 2026/2027.  These were approved as part of the
2026/2027 Budget. 
3.3. The Transformational Reviews continue to progress, and this report provides an
update on these Cross-Cutting reviews (Section 4) and Resource specific reviews
(Section 5) and references any savings that were approved as part of the 2026/2027
Budget Strategy where relevant and identifies any new savings since the Budget was
approved. 
4. Transformational Change Programme: Cross-Cutting Transformational Reviews
4.1. Each review is taken in turn with a summary of their current status. 
4.2. Procurement:  An update presented to this Forum on 24 February 2026 noted that
efficiency opportunities totalling £1.043 million had been identified for contribution to
the 2026/2027 Budget Strategy.  These efficiencies were approved as part of the
2026/2027 Budget. 
6
63

Page 64

4.3. This is an ongoing Review, and the next phase has identified General Fund savings
totalling a further £0.157 million.  These are detailed in Table 1.  In addition, there
are savings of £0.028 million for the Housing Revenue Account, £0.001 million each
for the Integration Joint Board, Lanarkshire Valuation Joint Board and South
Lanarkshire Leisure and Culture, and £0.100 million for the capital programme. 
Table 1 – Procurement Savings
Proposal Total 
£m
2026/2027
£m 
2027/2028
£m 
Wiring and Circuits £0.098 £0.098 -
Mobile Welding £0.011 £0.011 -
Occupational Health £0.031 £0.023 £0.008
Adobe Licences £0.008 £0.008 -
Children’s Advocacy £0.004 £0.004 -
Educational App: Maths £0.005 £0.005 -
Total  £0.157 £0.149 £0.008 
4.4. The 2026/2027 underspend generated by these savings will be declared as an
underspend in 2026/2027, with the full year impact of these savings being included as
a reduction to the Budget Gap in the 2027/2028 Budget Strategy report to the
Executive Committee in June 2026. 
4.5. The Transformation Programme run by SOLACE / Improvement Service includes a
workstream for Procurement Collaboration within Local Government, targeting Waste,
Fleet and Digital.  Procurement have attended all sub-group sessions to discuss the
project outcomes and Services have responded to requests for information by the
Improvement Service.  Updates on the progress of this joint work with SOLACE /
Improvement Service and any efficiencies it realises, will continue to be reported to
Members. 
4.6. Overtime: As reported previously, the review of overtime practices and spend looked
to reduce expenditure and to remove / reduce the associated risks to employees as a
result of overtime.  This included a focus on reducing the need for overtime and as a
result of this, a saving of £0.991 million was approved as part of the 2026/2027 Budget. 
4.7. Following the end of the financial year, the work to reduce overtime continues to
ensure that the saving for 2026/2027 is achieved, and to identify any further reductions
where possible.  Resources are currently finalising an action plan for 2026/2027 to
target key areas where spend is higher than anticipated. 
4.8. As previously reported, these actions will target regular and recurring recruitment
activity, a wider distribution of adverts and hosting of recruitment events to minimise
vacancy periods and thus reduce the reliance on overtime.  They will also include
compliance with the Maximising Attendance Policy to reduce absence at work.  Finally,
they will look to convert overtime hours to contracted hours, and to create posts where
it is possible to do so instead of carrying out overtime.  There will be overtime that is
required on an annual basis due to the nature of delivering front line services,
emergencies, and weather events, and this continues to be identified as we carry out
the review.  
64

Page 65

4.9. Customer Engagement: This Review is looking at the technologies, systems and
structures used to deliver customer services across the Council.  Taking an evidence-
based approach, improvements in service delivery are expected in the ways
customers contact the Council, the services they receive and the internal business
processes that support service delivery. 
4.10. One of these changes is in relation to Benefits and Revenues call centre which moved
to Customer Services at the end of January 2026 with opportunities for streamlining
of processes being developed.  There are two workstreams ongoing.  The update on
each is detailed below: 
1) Continuous Improvement: Phase 2 of the process review activity is nearing
completion with the results pointing to the potential for further financial savings
based on the implementation of new solutions to automate processes with
improved workflow.  The next phase of process mapping will focus on those
processes which may form part the first phase of a future implementation
programme for a Customer Experience Platform (CXP) that would deliver
automation and workflow.   
There are more than 200 enquiry types currently supported by the contact centre
with work underway to develop an approach for reviewing these processes and
prioritising high-volume areas for end-to-end review.  Other review areas also
include a focus on avoidable contact and email usage. 
2) Transformational Change: A business case for the implementation of the
aforementioned Customer Experience Platform (CXP) is being developed and will
look to identify opportunities to deliver efficiencies through process improvement
and automation (as noted above).  As part of the initial work, a pre-market
engagement questionnaire has been issued to potential suppliers to gather
information on the levels of functionality and opportunity that could be provided
from a CXP. 
In addition, a series of Council demonstrations are being set up to see how the
functionality that can be provided by a CXP is being delivered in practice.  The
Council’s first Customer Experience Strategy is in the final stages of drafting, and
will be presented to Members later in the year. 
4.11. Further updates will be presented to this Forum as and when they become available. 
4.12. Digital Transformation: This review aims to ensure resources are suitably deployed
to priority projects across Resources to deliver maximum efficiency returns, and is
defined by three key areas of focus: 
1) Business Systems and Processes: projects and improvements to key corporate
and line of business applications
2) Workforce Productivity: focus on enabling and empowering staff to maximise their
effectiveness and digital literacy
3) Customer Engagement: clear and consistent Council-wide customer engagement 
4.13. A structured action plan is now in place, and significant progress has been made
across several key areas.  Some of these are detailed below.  
65

Page 66

4.14. Work to upgrade the Council’s web estate has moved from planning into active
delivery.  Governance arrangements and project scope are in place, and work is
underway to develop and implement the redesigned platform.  Resources are actively
reviewing and updating website content in preparation for it being migrated to the new
platform.  The new public facing website is scheduled to go live at the end of July
2026, following which the intranet site will be developed, and along with the other
galaxies (sub-sites), will be migrated to the new technical environment.  This will
provide a more modern, accessible and customer-focused digital presence,
supporting improved engagement and more efficient online transactions. 
4.15. The initial phase of the Copilot Accelerator Pilot Programme came to an end on 31
March 2026.  Officers who had been assigned a Copilot Licence tested Microsoft
Copilot to assess its impact on productivity and ways of working, reported tangible
time savings in areas such as document summarisation, drafting communications and
meeting outputs.  A key element of the project was for officers to submit formal
feedback, and this is now being analysed as part of the evaluation of the pilot
programme which will support future decisions on wider adoption.  In related work, a
draft AI Policy is being developed. 
4.16. Alongside the core delivery activity, a number of complementary initiatives are
progressing to strengthen the Council’s digital foundations and support the
identification of longer-term efficiencies. These include: 
• Data: Work to improve the quality, consistency and use of data continues to be a
priority.  The Council has been an active participant in the Scottish Government’s
6th Data Maturity Cohort which concluded in early April.  A key output from this
programme was the results from the council’s Data Maturity Assessment.  An
action plan is now being developed that will deliver a framework for the Council to
improve quality and drive benefit from its data.
• Processes: Engage Process Modeler enables services to map end-to-end
processes, test “what-if” scenarios and better understand time and cost drivers. 
This programme has been scaled up and rolled out with 122 officers now trained
in the modeler aspect of the product along with 58 officers who are trained process
modeler approvers. 
4.17. The majority of savings from this review are anticipated in future years, however a
saving of £0.030m was agreed as part of the 2026/2027 Budget Strategy, as a result
of the refresh of the website technology contract. 
4.18. Shared Services Review: The Council continues to engage with SOLACE and the
Improvement Service across a number of workstreams as part of the national
SOLACE/Improvement Service Transformation Programme.  To expand on this work
further, a cross-Resource review of shared service opportunities for the Council was
undertaken in late 2025, with four key areas of activity being explored to determine the
potential for shared service arrangements: 
1. IT Services and the Digital Office
2. Personnel Services, Clyde Valley and Training
3. Providing Print Services for Other Organisations
4. Shared Services within Legal Services and Licensing and Registration  
66

Page 67

4.19. IT Services and the Digital Office – Key activity focused on establishing an action
plan and maintaining/strengthening Council engagement across the Digital Office
portfolio, spanning strategic national programmes, and shared procurement
workstreams.  In parallel, the Council is monitoring and engaging in shared
procurement opportunities (e.g., Microsoft licensing, data agreements and Engage
Process), while tracking changes such as the closure of the national Security
Operations Centre framework work. 
4.20. The Council is already significantly engaged with the Digital Office, and where
opportunities arise, the Council will continue to pursue digital shared services and
procurements. 
4.21. Personnel Services, Clyde Valley and Training – The Clyde Valley Learning and
Development Group (CVLDG) is a good example of collaborative working across a
number of councils, of which South Lanarkshire is the lead.  The Review is considering
the governance structures in place which include officer groups, a steering group and
a Joint Committee, supported by Administration and attended by Members.  It is also
subject to a separate charge for external audit by the Council’s Auditors (Audit
Scotland).   
4.22. The Terms of Reference requested consideration of alternative delivery structures
/governance arrangements, as well as potential to expand the delivery model to the
benefit of all member councils.  An update on the Review will be provided to the next
meeting. 
4.23. Providing Print Services for Other Organisations – The Terms of Reference
considered two areas of activity: the potential for greater throughput of printed
products in the Council Print Centre; and that additional approaches would be made
to other Scottish local authorities and other potential customers. 
4.24. The Review considered the capacity of the print service and the good level of service
carried out for internal customers.  It was identified that significant investment would
be required in staffing if there was to be a significant increase in external print volumes. 
Direct approaches were made to other councils, to test whether this would be
worthwhile, however there was no appetite for a shared print service from potential
partners/customers.  The service will continue to seek such opportunities in the future,
but at the moment, this formal Review is noted as complete. 
4.25. Shared Services within Legal Services and Licensing and Registration – The
intention of the review was to consider surrounding local authorities as potential
shared services partners.  No immediate direct opportunities have been identified,
however, the Head of Administration and Legal Services, will continue to participate in
the work being undertaken by the Improvement Service/SOLACE around shared
services.   
5. Transformational Change Programme: Resource Specific Reviews
5.1. Each review is taken in turn with a summary of their current status. 
5.2. Factoring: As reported previously, a full review of the Factoring Service provided to
owners of former Council Housing Stock, is being undertaken by Housing and
Technical Resources.  At present this service provides a repairs and maintenance
service to owners.    
67

Page 68

5.3. The Review will inform the future direction and culture of the Factoring Services
function and provide options for a future service delivery model to deliver a high-quality
effective service.  Consideration is being given to resourcing levels, staff development,
team structures and to ensure processes are effective and efficient.  The findings of
this work are currently being finalised and give consideration to potential changes to
the future service delivery structure which will be reported to a forthcoming meeting of
the Housing and Technical Resources Committee.  An update will be brought to a
future meeting of this Forum, following conclusion of this work. 
5.4. Long Term Estate Strategy:  The development of the Estate Strategy aims to support
future public service delivery, encourage collaboration with other public sector bodies,
and guide decisions about investment, rationalisation, co-location, and asset disposal. 
It prioritises a smaller, high-quality, energy-efficient estate, facilitates net zero
transition, promotes community asset transfer when appropriate, and addresses
financial pressures facing the Council and South Lanarkshire Leisure and Culture. 
5.5. The Review work is split into three inter-related phases with phase 1 being the initial
review of property/usage data and the development of a score for each property. 
Phase 2 then prioritised projects using agreed criteria and identified strategic
opportunities for regeneration and partnerships. Phases 1 and 2 are complete.   
5.6. Phase 3 is the development of the Estate Strategy and an associated 10-year Delivery
plan.  This phase is progressing with a final report to the Executive Committee planned
for June 2026.  This report will detail timelines for consultation of the Review’s
proposals, including the proposed use of the £24 million investment monies, and to
allow the final recommendations to be collated for presentation to Members. 
6. Employee Implications
6.1. There are no employee implications from the update in this report. 
7. Financial Implications
7.1. The financial implications of the Transformational Reviews for 2026/2027 are
summarised in Table 2.  These were included in the 2026/2027 savings proposals.   
Table 2: Transformational Reviews – Proposed Savings for 2026/2027  
Reference Saving FTE
26/27
Saving
26/27
£m
M&O01 Procurement Review - 1.043
M&O02 Overtime Review - 0.991
M&O03 Organisational and Management Structures
Review
21.0 0.900
M&O06 Annual Increase to Planning and Building
Warrant Fees 
- 0.172
M&O07 Digital Transformation Review - 0.030
M&O08 Customer Engagement Review 2.0 0.048
CER12 Planning – Introduction of Charges - 0.100 
Total Savings 23.0 3.284 
7.2. As noted in section 4.3 / Table 1, since the 2026/2027 Budget was set, a further £0.157
million of General Services savings have been identified from the Procurement
Review.  These will form part of the Budget Strategy for 2027/2028.  68

Page 69

7.3. These savings are over and above the £2.680 million of the ongoing transformational
reviews on procurement, overtime, management structures and council charges which
were approved savings for 2025/2026 specifically.  
8. Transformation and the Way Forward
8.1. The Council continues to operate in a period of sustained change and increasing
financial pressure.  To continue delivering effective, high‑quality services for our
residents, we must plan proactively for the future and adapt how we operate. 
8.2. The Council faces a range of challenges, including economic pressures, demographic
change, increasing demand for services, legislative requirements and rapid
technological development.  Collectively, these factors require a continual focus on
transformation and improvement, and both the Reviews detailed in this report, and
previous concluded Reviews, have assisted in supporting the Council both financially
and operationally.  As a number of these Reviews are coming to an end, we need to
look forward and ensure that we continue to respond to these challenges, balance the
Council’s Budget and continue to improve services in the coming years. 
8.3. To do that, a pipeline of activity is being compiled which will direct Review activity
moving forward and will ensure we meet the challenges ahead, both financial and
operational.  It is anticipated that this will be presented to the Council’s Executive
Committee in June, alongside the Budget Strategy for the coming year, 2027/2028. 
9. Other Implications
9.1. The main risk associated with the Transformational Review is a delay in delivery.  This
risk is assessed as being low as each Review is led by a Head of Service with a
sponsor from the Corporate Management Team.  There is a strong governance
process in place for all Reviews, and they work to a Terms of Reference agreed by
this Forum.  Progress on each Review is reported to this Forum for Member scrutiny.   
9.2. There are no implications for sustainability in terms of the information contained in this
report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
69

Page 70

Previous References
 Executive Committee, 26 June 2024
 Cross-Cutting Reviews – Update - Performance and Review Scrutiny Forum 27 August
2024 Transformational Reviews – Cross-Cutting – Update - Performance and Review
Scrutiny Forum 19 November
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 04
February 2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 01 April
2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 17 June
2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 19
August 2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 25
November 2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 24
February 2026 
List of Background Papers
 2026/2027 to 2027/2028 Revenue Budget Gap and Savings Proposals for 2026/2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601  (Tel: 01698 452601)
lorraine.o'hagan@southlanarkshire.gov.uk 