Agenda Document Pack - Performance and Review Scrutiny Forum - 24/02/2026

South Lanarkshire Council · 24 February 2026
Back to Performance and Review Scrutiny Forum — 24 February 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 16 February 2026 
Dear Councillor 
Performance and Review Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Tuesday, 24 February 2026
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair), Gerry Convery (Depute Chair), John Anderson, Maureen Chalmers, Maureen
Devlin, Richard Lockhart, Katy Loudon, Davie McLachlan, Kirsten Robb, John Ross 
Substitutes
Andrea Cowan, Gladys Ferguson-Miller, Martin Hose, Eileen Logan, Margaret B Walker
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Performance and Review Scrutiny Forum held on
25 November 2025 submitted for approval as a correct record.  (Copy attached) 
3 - 8 
Item(s) for Consideration 
3 Accounts Commission Audit of Best Value – North Lanarkshire Council
Report dated 26 January 2026 by the Chief Executive.  (Copy attached) 
9 - 12 
4 South Lanarkshire Council Best Value Audit
Report dated 26 January 2026 by the Chief Executive. (Copy attached) 
13 - 26 
5 Transformational Reviews - Update
Report dated 29 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
27 - 34 
6 Transformational Review of Routes to Work South
Report dated 16 January 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
35 - 44 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370 089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

PERFORMANCE AND REVIEW SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 25 November 2025 
Chair:
Councillor Joe Fagan 
Councillors Present:
Councillor John Anderson, Councillor Maureen Chalmers, Councillor Gerry Convery (Depute),
Councillor Maureen Devlin, Councillor Katy Loudon, Councillor Davie McLachlan, Councillor Kirsten
Robb, Councillor John Ross 
Councillor’s Apology:
Councillor Richard Lockhart 
Attending:
Chief Executive’s Service
T Little, Head of Communications and Strategy; L Marshall, Finance Adviser; N Reid, Research and
Improvement Manager
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development; K Carr, Head of Facilities, Waste and
Grounds Services; C Park, Head of Roads, Transportation and Fleet Services
Education Resources
G Lambie, Performance, Planning and Operations Manager
Finance and Corporate Resources
J Taylor, Executive Director; S Jessup, Administration Assistant; L O’Hagan, Head of Finance
(Strategy); T Slater, Administration Adviser
Housing and Technical Resources
C Jardine, Head of Property Services; H Philips, Performance Co-ordinator
Health and Social Care/Social Work Resources
M Kane, Service Manager (Performance and Support) 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Performance and Review Scrutiny Forum held on 19 August
2025 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Council Plan Connect 2022 to 2027 - Quarter 2 Progress Report 2025/2026 
A report dated 27 October 2025 by the Chief Executive was submitted on the progress of
‘Connect’, the Council Plan 2022 to 2027, at the Quarter 2 stage of 2025/2026.
2
3

Page 4

‘Connect’ detailed the Council’s vision, values, priorities and outcomes to be delivered in the 5-
year period of the Plan.  Of the 64 key strategic measures nominated for reporting against the
Plan:- 
 5 projects had been completed
 41 had met their timescale or target as per expectations
 8 had minor slippage against timescale or minor shortfall against target
 0 had major slippage against timescale or major shortfall against target
 10 had information which was not available or included for ‘information only’, to set
performance information in context 
A summary of the key achievements against each of the 6 ‘Connect’ Outcomes was contained
in the report and the ‘Connect’ Performance Report for Quarter 2, 2025/2026, covering the
period to the 30 September 2025, was attached as Appendix 1 to the report. 
To aid scrutiny, a further analysis had been introduced to follow-up the measures from the
previous year’s Quarter 4 report that had been assigned as ‘report later’.  There were 2 ‘report
later’ measures in the Quarter 4 2024/2025 report, and updates were detailed in Appendix 2 to
the report. 
The Forum decided: 
(1) that the ‘Connect’ Quarter 2 Progress Report 2025/2026, summarised in the report and
detailed in Appendix 1 to the report, be noted; 
(2) that the summary of the Council’s key achievements against the 6 ‘Connect’ Outcomes be
noted; and 
(3) that the additional scrutiny of reporting the updated status of those measures identified as
‘report later’ at Quarter 4 2024/2025, as summarised in the report and detailed in Appendix
2 to the report, be noted. 
[Reference: Minutes of 19 August 2025 (Paragraph 3)] 
4 Resource Plans Red and Amber Results at Quarter 2, 2025/2026 
A report dated 27 October 2025 by the Chief Executive was submitted on performance
measures where results at Quarter 2, 2025/2026 had been recorded as either ‘red’ (there had
been major slippage against timescale or major shortfall against target) or ‘amber’ (there had
been minor slippage against timescale or minor shortfall against target). 
Across all Resources, 21 out of 266 measures relating to Council priorities had a status of
‘amber’ and 8 had a status of ‘red’.  The remaining 237 measures (89%) had a status of ‘blue’
(project completed), ‘green’ (the timescale or target had been met in line with expectations) or
‘report later’ (the information was not yet available to allow officers to say whether the target had
been reached or not but would be reported when available). 
For 2025/2026, there had been a slight increase in the number of ‘red’ and ‘amber’ measures
reported in comparison to the previous year.  This was due, in part, to a continuing and
comprehensive review of measures and targets which had resulted in greater clarity when
assigning measures with the appropriate status.
4

Page 5

An explanation on progress to date, the circumstances which had determined the ‘red’ or
‘amber’ status, including unforeseen changes in timescales, circumstances, or work being
underway but not yet complete, and progress updates providing revised timescales for
completion, where relevant, as well as management actions, were provided in Appendix 1 to the
report. 
In response to a member’s question, the Head of Property Services undertook to provide the
member with an update on the Calderwood multi-storey heating upgrade project when available
and to ensure that the appropriate engagement with residents took place. 
The Forum decided: 
(1) that the detail relating to red and amber results be noted; and 
(2) that remedial action or mitigation be noted. 
5 Local Government Benchmarking Framework (LGBF) 2023/2024 Results and
Action Plan - Update 
A report dated 27 October 2025 by the Chief Executive was submitted on the updated Local
Government Benchmarking Framework (LGBF) results for 2023/2024. 
The LGBF compared spend/cost, performance and customer satisfaction results over several
years and between similar councils.  It comprised a number of performance indicators across a
range of services. 
An initial report on the 2023/2024 LGBF results was submitted to the Forum on 1 April 2025. 
Updated information was provided on the 2023/2024 LGBF results in Appendix 1 to the report. 
Across the 102 indicators in the 2023/2024 suite, the Council’s performance improved against
51 (50%) indicators, remained the same against 6 (6%) indicators, and declined for 42 (41%)
indicators.  There were 3 (3%) indicators for which the results or trend information was not yet
available for 2023/2024, namely energy efficiency of council dwellings and educational
exclusions. 
In terms of South Lanarkshire’s figures relative to national results, performance was better than
the Scottish average for 57 (56%) indicators and was worse than the average for 40 (39%)
indicators.  There were 3 (3%) indicators for which the 2023/2024 results were not yet available. 
The updated 2023/2024 LGBF results for the Council would be uploaded onto the performance
pages on the Council’s website.  In addition, South Lanarkshire’s LGBF Dashboard would be
updated for the results released since March 2024, as well as the explanatory narratives
provided by Resources.   
The Forum decided: 
(1) that the updated LGBF results, narrative and actions for 2023/2024 be noted; 
(2) that it be noted that the updated LGBF results and explanatory narratives would be
published on the performance pages of the Council’s website; and 
(3) that it be noted that South Lanarkshire’s LGBF Dashboard would be updated. 
[Reference: Minutes of 1 April 2025 (Paragraph 3)] 
5

Page 6

6 Accounts Commission Audit of Best Value – North Ayrshire Council 
A report dated 28 October 2025 by the Chief Executive was submitted on the key messages and
recommendations from recent reports published by the Accounts Commission on Best Value. 
Towards the end of 2023, the Accounts Commission introduced a new approach to the Audit of
Best Value to replace the Best Value Assurance Report (BVAR) arrangements which had run
from 2018 to 2023. 
The approach consisted of brief Controller of Audit (CoA) reports accompanied by, and
reflecting on, published annual audit reports.  The CoA reports were considered by the Accounts
Commission in public and reported publicly. 
Information was provided on the findings and key messages from the recent CoA report for
North Ayrshire Council. 
The Forum decided: that the key messages and recommendations within the
Controller of Audit report for North Ayrshire Council be
noted. 
7 Transformational Reviews - Update 
A report dated 21 October 2025 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the Transformational Reviews that were part of the
Council’s Transformational Change Programme for the year 2025/2026 and beyond. 
At its meeting on 26 June 2024, the Council’s Executive Committee noted the Transformational
Change Programme that was required to drive continuous improvement and efficiencies, and
link into the Budget Strategy over the next 3 years. 
Updates had been provided to previous meetings of the Forum.  This report provided a further
update on the following cross-cutting and Resource specific transformational reviews being
undertaken:- 
 Procurement
 Fleet
 Organisational and Management Structures
 Overtime
 Customer Engagement
 Digital Transformation
 Third Sector Review
 Factoring
 Long-term Estate Strategy (including Depot Rationalisation)
 Planning and Regulatory – Online Service Delivery, Digital Delivery and Consideration of
Other Models
 Property Services – Efficiencies and Income Generation
 Routes to Work South (RTWS) 
A separate update report in relation to in-house and procured services had been included on the
agenda for this meeting. 
Savings identified from the reviews had been presented to the Executive Committee on 5
November 2025 for consideration as part of the 2026/2027 proposals to reduce the budget gap. 
This included proposed combined savings of £3.042 million for 2026/2027, as summarised in
paragraph 7.1 of the report.
6

Page 7

Officers responded to members’ questions in relation to various aspects of the report. 
The Forum decided: that the update on Transformational Reviews be noted. 
[Reference: Minutes of 19 August 2025 (Paragraph 6) and Minutes of the Executive Committee
of 26 June 2024 (Paragraph 9) and 5 November 2025 (Paragraph 9] 
8 Bringing Contracts In-House 
A report dated 30 October 2025 by the Executive Director (Finance and Corporate Resources)
was submitted advising of the conclusion of the transformational review on bringing contracts in-
house. 
This review provided a robust examination of existing contracts and areas of high spend in order
to ensure that Best Value was being delivered.  A review of the Council’s Contract Register was
initiated and any services contracts (not goods contracts) with a total annual value exceeding
£0.250 million, and which were expected to come to an end within the calendar years 2025 to
2027, were considered within the scope of the review. 
Work was undertaken across Resources over the spring/summer period to interrogate spending
practices across over 70 areas of spend, considering the merits of in-house against external
provision of service, as well as ensuring Best Value was being delivered in all areas of service. 
The Forum decided: 
(1) that the outcomes of the review and actions provided by the Resources, as summarised in
section 5 of the report, be noted; 
(2) that the update to the Procurement Sourcing Strategy, as outlined in section 6 of the
report, be noted; and 
(3) that Appendix 2, which summarised considerations given to all 20 high-spend areas, and
the outcome of each as a result of this review, be noted. 
9 Urgent Business 
There were no items of urgent business. 
7

Page 8

8

Page 9

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 24 February 2026
Report by: Chief Executive  
Subject: Accounts Commission Audit of Best Value – North
Lanarkshire Council 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Forum of key messages and recommendations from recent reports
published by the Accounts Commission on Best Value
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approved the following recommendation(s):-
[]
(1) that the key messages and recommendations within the report be noted.
[1recs]
3. Background
3.1. Towards the end of 2023, the Accounts Commission introduced a new approach to
the Audit of Best Value to replace the Best Value Assurance Report (BVAR) regime
which had run from 2018 to 2023. 
3.2. The approach consists of brief Controller of Audit (CoA) reports accompanied by and
reflecting on published annual audit reports.  These CoA reports are considered by
the Commission in public and reported publicly. 
3.3. The CoA reports are intended to offer a BV-focused reflection on the council’s
annual audit report.  In line with the previous practice of bringing BVAR findings to
the Forum to highlight good practice and place our own activities in context, the
findings from the recent CoA reports are summarised below. 
4. North Lanarkshire Council (published 15 January 2026)
4.1. North Lanarkshire Council receives a favourable report, with auditors concluding that
the council is self-aware, actively identifies areas for improvement, keen to learn
from others’ experience, and committed to improving outcomes and reducing
inequalities.  The Commission findings are: 
 As one of Scotland’s largest councils, and with significant and persistent socio-
economic challenges, we are impressed with North Lanarkshire’s commitment
to improving outcomes for its communities and its outward-facing approach to
working with partners across and outwith the region.  Examples include its
partnership working with NHS Lanarkshire and North and South Lanarkshire
Integration Joint Boards in the delivery of health and social care services, and
with the construction sector in relation to skills. 
3
9

Page 10

 The council has an ambitious vision for the area that is shared with partners,
underpinned by a well-established programme of work.  Combined with
effective financial and performance management, a track record of delivering
savings, integrated workforce planning, and prioritisation of community
engagement, the council has strong foundations for addressing its widening
budget gap.  Given the significant financial challenges ahead, we expect the
council to address the auditor’s recommendation around reviewing its approach
to the use of reserves and to now set out clearly how it intends to close the
budget gap. 
 Transformation is embedded at a service level, and the council is taking an
innovative place-based approach to addressing future financial sustainability
and improving outcomes, including creating community hubs with partners such
as the NHS.  Ensuring that financial and non-financial benefits are tracked is
essential, as is establishing what’s worked well and what lessons can be
learned when deciding where to focus limited resources going forward.  We
look forward to seeing progress on its benefits realisation tool in the next annual
audit report, given the increasing role that transformation needs to play in
closing the budget gap. 
 The council’s approach to housing and homelessness should be recognised
and its Local Government Benchmarking Framework performance indicators in
this service area are among the best in Scotland, demonstrating the impact of
its sustained investment and preventative approaches.  However, there is
mixed performance in other service areas and like many others, the council has
seen a sustained deterioration of satisfaction indicators since 2010-11 which
should be further explored.  Addressing future financial challenges is likely to
continue to involve a mix of transformation, redesign and some service
reductions, so we would urge the council to continue to monitor the impact on
service performance and customer satisfaction.  It should also ensure that work
to improve public reporting of performance across its strategic key ‘health
check’ indicators is concluded so that wider impacts on outcomes are visible. 
 We are pleased to see that the council has responded positively to the auditor’s
recommendations around improving processes for elected member
engagement, including in strategic planning.  Maintaining members’
commitment to the council’s vision, priorities and transformation will be
essential as we approach an election year.  The council’s commitment to a
review of democratic, committee and decision-making governance procedures
is also welcomed.  We expect to see evidence of enhanced scrutiny in relation
to senior officer restructuring, which should include documented consideration
of options around achieving value for money. 
 The council has made its expectations of staff very clear in relation to hybrid
working and we would encourage it to monitor the impacts of this policy on
productivity, performance, staff wellbeing, recruitment and retention.  Ongoing
engagement and effective relationships with staff and trade unions will be
essential to achieving financial sustainability and the council’s vision for the
area. 
5. Next Steps and Recommendations
5.1. Officers of the Council will continue to review the CoA reports as they are published
to learn any lessons for the Council.  Reports on any significant findings and key
messages will be brought to the Forum for information.
10

Page 11

6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, plan or strategy so an Integrated Impact
Assessment is not required.  There is no requirement for consultation on the content
of the report. 
Paul Manning
Chief Executive 
26 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698 454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
11

Page 12

12

Page 13

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 24 February 2026
Report by: Chief Executive  
Subject: South Lanarkshire Council Best Value Audit 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide details of preparations for South Lanarkshire Council’s next Best Value
audit, which is expected to take place in November 2026
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[]
(1) that the contents of the report be noted.
3. Background
3.1. Audit Scotland began auditing Best Value (BV) in November 2003.  Since then, the
approach to the Audit of BV has evolved through several iterations, with the most
recent round of audits commencing in October 2023.  Under the latest
arrangements, each council is expected to be audited at least once by August 2027. 
3.2. South Lanarkshire has received notification that its BV audit in this round is likely to
take place in November 2026. 
3.3. This report provides background to the audit and details of a self-assessment
exercise to be undertaken as part of the Council’s preparations over the next few
months.
4. Evolution of the Audit of Best Value
4.1. In the first round of Best Value audits, carried out between 2003 and 2008, Audit
Scotland produced BV audit reports on all 32 councils.  South Lanarkshire’s Audit of
Best Value and Community Planning took place in 2008 (published 2009). 
4.2. In 2008/2009, the Accounts Commission introduced a more “proportionate and risk-
based” approach to the Audit of BV, aiming to target audit resources on councils
identified through a risk assessment process as requiring Best Value audit activity on
specific Best Value characteristics.  South Lanarkshire’s risk assessments did not
trigger an audit under this regime. 
4.3. In 2015, the Commission undertook a further review of its approach and concluded
that there was a need for more frequent assurance on BV across all 32 councils,
focused on driving the pace and depth of improvement in local government.  South
Lanarkshire’s Best Value Assurance Report (BVAR) was published in 2019 under
this new approach.  
4
13

Page 14

4.4. From 2023, the Commission has integrated the Best Value audit into annual financial
audit work to increase efficiency and reduce the scrutiny burden on councils.  The
work is reported in Annual Audit Reports, including annual risk-based, follow-up and
thematic Best Value work, providing judgements on the pace and depth of
continuous improvements and service performance.  From the thematic work
undertaken each year, Audit Scotland publishes a BV thematic report for the
attention of all councils. 
4.5. As an additional part of the new approach, each council is expected to be the subject
of at least one Controller of Audit (CoA) report within the 5-year audit period, starting
October 2023.  Each CoA report focuses on how the council has achieved BV as
evidenced by its annual audits and the thematic work by auditors.  The CoA report is
not the result of a separate, focused audit but is, instead, an audit opinion which
draws heavily upon and is led by the audit work integrated into the annual audit. 
4.6. As noted at 3.2 above, South Lanarkshire Council’s CoA report is expected in
November 2026.  In view of the reliance placed by the CoA report on previous audit
work, section 5 below summarises South Lanarkshire’s BV audits and key
messages. 
5. BV Audits of South Lanarkshire Council
5.1. The most recent large-scale BV audit was the BVAR in 2018, reported in 2019,
which made 10 recommendations.  An action plan was developed in response, with
all actions considered complete by 2022.  Appendix 1 reproduces the
recommendations and associated action plan. 
5.2. The table below shows the summary BV judgements contained within the annual
audits since the start of the new approach in 2023.  These will be particularly
relevant to the CoA report in November 2026. 
2022/2023 Thematic focus: Leadership of the development of new local
strategic priorities.  National conclusions published in July 2024:
Delivering for the Future - Why Leadership Matters. 
BV Audit Conclusions
• The Council’s vision is supported by clear priorities. 
• The Council Plan demonstrates a clear commitment to
empowering local communities and continuing to develop
partnership working with them. 
• The Council approved its new Sustainable Development and
Climate Change Strategy 2022 to 2027 in June 2022.  The new
strategy aims to tackle climate change over the medium-term
and provides a broad strategic direction for longer-term
planning. 
• A Best Value Assurance Report on South Lanarkshire Council
was published in March 2019, containing ten improvement
recommendations.  The Council has concluded these have now
been addressed. 
14

Page 15

2023/2024 Thematic focus: Workforce Innovation.  National picture published
in August 2025: Delivering for the future: responding to the
workforce challenge. 
BV Audit Conclusions
• The Council’s Workforce Plan 2022 to 2025 is supported by
detailed service level plans, however there is an opportunity for
this to have a more strategic focus.
• The Council is using digital technology to support new ways of
working but has not yet set out how it plans to use digital
technology to shape its future workforce.
• Our follow up work of Best Value improvement
recommendations from 2022/2023 concluded that the Council
has now addressed these recommendations. 
2024/2025 Thematic focus: service transformation and redesign to maintain
outcomes and deliver services more efficiently. 
BV Audit Conclusions
• The Council has effective and appropriate arrangements in
place for securing Best Value. 
• The Council has a Transformational Change Programme in
place that is clearly linked to its updated Council Plan, financial
plans and digital strategy. 
• The Council currently focuses on establishing the financial
benefits of its transformational activities but does not routinely
separately track or report on the impact on service quality or
outcomes for service users in relation to these transformational
activities. 
• Audit work assessed the arrangements the Council has in place
for preparing and publishing Scottish Performance Information
(SPI), including how it has responded to assessments, and
concluded the arrangements in place were effective and
appropriate. 
• The Council has an improvement action plan for all indicators,
including those reported as being below the Scottish average. 
• The Council has an effective performance management
framework in place.  The Council reviews and reports its
performance using a number of measures that are clearly
aligned to the priorities and outcomes set out in the Council
Plan. 
5.3. Since the BV report draws heavily on previous audit judgements, including progress
against BVAR recommendations, it will be important to review the action plans
arising from these audits.  Appendix 2 reproduces the actions arising from the annual
audits 2022/2023 to 2024/2025. 
6. BV Audits of Other Councils
6.1. BV reports which have been published on other councils have been reported to the
Performance and Review Scrutiny Forum, to highlight good practice elsewhere and
to illustrate how auditors are interpreting the requirements of Best Value.  The latest
report, on North Lanarkshire Council, is included on the agenda of this meeting.  
15

Page 16

6.2. Recent BV audits have followed a well-defined structure, reporting across the
following headings: 
 Pace of Continuous Improvement
 BVAR Follow-up
 Leadership Review
 Citizen and Community Engagement
 Effectiveness of Performance Reporting
 Reported Performance
 Workforce Planning
 Transformation (added into the most recent report published, informed by the
2024/2025 thematic work on transformation)
 Financial Management and Sustainability 
6.3. The “Leadership”, “Workforce Planning” and “Transformation” topics are based on
the annual thematic work within the annual audits.  As noted at 4.4. above, these
themes have been the subject of national reports by Audit Scotland, which review
practice across local government and provide key messages and recommendations. 
The theme for 2026/2027 is “Asset Management”. 
7. Next Steps
7.1. This report has summarised Audit Scotland’s latest approach to the Audit of Best
Value.  The new regime is designed to reduce the scrutiny burden on councils, while
at the same time offering more regular and more consistent judgements on how BV
is being implemented.  Feedback from councils which have already had their CoA
reports makes it clear that these are more focused, largely desktop exercises which
require less preparation by, and input from, the council compared to the BVAR. 
7.2. In line with the national approach at the time, a number of elected members were
interviewed during 2018 as part of the Council’s BVAR.  The experience of other
councils which have already had their CoA reviews would suggest that this is unlikely
to be the case in 2026. 
7.3. As noted above, the CoA report will reflect on, summarise, and follow up on recent
BV audit work, including the BVAR of 2018. Officers will therefore: 
 review the actions from the 2018 BVAR (see Appendix 1) to obtain a current picture
of how these actions have progressed;
 review the BV judgements in the annual audit reports since 2022/2023 (see
Appendix 2) to ensure appropriate actions have been taken; and
 review the thematic BV reports published by Audit Scotland and assess the South
Lanarkshire position against the recommendations. 
7.4. The results of these reviews will inform further preparations that may be required in
advance of the audit.  These, and any other developments, will be reported to the
Forum in an update report to its meeting on 11 August 2026. 
8. Employee Implications
8.1. There are no direct employee implications. 
9. Financial Implications
9.1. There are no direct financial implications.  
16

Page 17

10. Other Implications
10.1. None. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, plan or strategy so an Integrated Impact
Assessment is not required.  There is no requirement for consultation on the content
of the report. 
Paul Manning
Chief Executive 
26 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
17

Page 18

Appendix 1: 2018 BVAR recommendations and Action Plan 
BVAR recommendation Agreed action (per Council meeting 26/06/2019) Timescale
To increase the impact of
the council’s efforts in
achieving its strategic
objectives, links between
the council plan (Connect
Plan) and the LOIP
(Community Plan) should be
made clearer with a sharper
focus on the key areas of
activity. Locality plans
should be prepared without
further delay. 
Paragraph 20 - While the
Community Plan’s overall
objective and the vision of the
Connect Plan are not mutually
exclusive, it is not immediately
obvious how they are
connected and what their
common focus is...To increase
the impact, the links between
the two plans need to be
clearer with a sharper focus
on the key areas of activity.
Action 1.1
Clarify the presentation of the Council Plan and how
it links to the LOIP (Community Plan) by developing
a “plan on a page” mapping the links between them. 
This will be used in future engagement and
consultation exercises with local people and
communities.   
Lead officer: Head of Communications and
Strategy 
December 2019 
Action 1.2
Undertake a mid-term review of Connect and in the
process ensure that the links to the LOIP
(Community Plan) are clearer, with a sharper focus
on key areas of activity. 
Lead officer: Head of Communications and
Strategy 
March 2020
Action 1.3
Locality plans (known as Neighbourhood Plans in
South Lanarkshire) will be developed in the
remaining 6 identified priority areas in South
Lanarkshire through the work of the Community
Participation and Empowerment Team (see also
action 10.1 below). 
Lead officer: CPET Manager 
March 2020 
Management should carry
out the staff survey and use
the results to drive
improvement and share
existing good practice. 
Paragraph 24 - Some staff felt
that the CMT are not as visible
to front-line staff as they would
like. The council should
ensure that existing good
practice is shared across all
resource directorates.
Action 2.1
An employee survey will be developed and carried
out by the end of September 2019.  The survey will
explore opportunities for sharing good practice more
widely, and seek suggestions for more employee
engagement. 
Lead officer: Head of Personnel Services 
September 2019
Action 2.2
Based on the findings of the employee survey, an
action plan will be developed in consultation with
the workforce and their representatives, with the
results and action plan being reported to Elected
Members by March 2020. 
Lead officer: Head of Personnel Services 
March 2020
Action 2.3
An online good practice hub will be developed to
share good practice across the council, drawing
from a range of sources including: 
- Nominations for internal/national awards 
- External audits and inspections
- Service review content (including Team
Based Mini Reviews) 
Lead officer: Head of Personnel Services/Head of
Communications and Strategy 
December 2019
Elected members need to
improve the public scrutiny
Action 3.1 
18

Page 19

BVAR recommendation Agreed action (per Council meeting 26/06/2019) Timescale
of key decisions,
performance and financial
reports.  
Paragraph 32 - Members need
to ensure that all key
decisions are seen to be
subject to an appropriate level
of challenge and scrutiny at
public meetings. This includes
sufficient discussion and
scrutiny of performance and
financial reports.
Complete the ongoing review of the council’s
governance arrangements.  Develop and implement
an action plan based on the findings of the review 
Lead officer: Head of Administration and Legal
Services 
August to
September
annually 
Members should, with the
assistance of the personnel
service, review their
personal training and
development needs and
agree a plan to ensure that
they have the skills required
to effectively fulfil their
scrutiny and challenge
roles. 
Paragraph 34 - Members
should, with the assistance of
the personnel service, review
their personal training and
development needs and agree
a plan to ensure that they
have the skills required to
effectively fulfil their scrutiny
and challenge roles.
Action 4.1
Elected Members will be offered the opportunity to
discuss training requirements with Personnel
Services, which will inform an individual training
plan for the forthcoming year.   
Lead officer: Head of Administration and Legal
Services 
October 2019 
Action 4.2
Deliver the 2019-20 Elected Members Training
Programme to equip Members with skills and
knowledge to effectively fulfil their scrutiny and
challenge roles. 
Lead officer: Head of Administration and Legal
Services
Timescale: 
Training delivered
from March 2019
onward
Management should ensure
that the indicators used to
measure performance
provide meaningful
information and are
appropriate to the reporting
level.  
Paragraph 42 - The council
acknowledged the need to
review the number and quality
of measures and targets
included in IMPROVe and is
carrying out a review... A
revised approach is expected
to be fully implemented for the
2019-20 reporting year.
Action 5.1
A comprehensive audit of performance reporting will
be completed by December 2019.  This will build on
work to date on performance information
requirements and reporting arrangements with a
view to removing duplication, closing gaps, and
improving the consistency and relevance of the
performance reporting framework across the
council.   
Lead officer: Head of Communications and
Strategy 
December 2019 
Management should review
arrangements for assessing
resident satisfaction, to
ensure these are providing
meaningful data to help
shape future services.  
Paragraph 58 - The council
carries out its own customer
satisfaction surveys with
Action 6.1
Review consultation activity within the council in
order to rationalise and capitalise on the information
which is being collected.  This will ensure that
decision making is shaped in the most effective
manner by the information provided by residents. 
Lead officer: Head of Personnel Services   
Research begins
September 2019
– report due April
2020 
19

Page 20

BVAR recommendation Agreed action (per Council meeting 26/06/2019) Timescale
service users, and the results
from those surveys show
higher satisfaction rates.
However, the council accepts
that there should be a wider
focus, beyond service users,
that considers views from
other residents who may not
currently be using those
services, to provide
meaningful data to help shape
future services.
Action 6.2
Review current approaches to assessing resident
satisfaction (see also action 10.1 below) 
Lead officer: Head of Personnel Services 
December 2019
The Community Planning
Partnership Board should
take a more active role in
driving partnership working,
monitoring outcomes and
feeding back to thematic
subgroups.  
Paragraph 116 - While it is
acknowledged that there are
positive and effective
relationships at group level,
the CPP should build on these
effective relationships and
take a more active role in
driving partnership working,
monitoring outcomes and
feeding back to groups.
Action 7.1
Having completed an initial self-assessment
facilitated by the Improvement Service, the CPP
Board will now review the output from this exercise
alongside the findings of the BVAR through a
facilitated discussion which will consider: 
• Roles and responsibilities within the CPP
• Links to thematic groups
• Monitoring and governance arrangements
• Community engagement and the structures
required to support community-based activity 
Lead officer: CPET manager 
March 2020  
The council should review
existing governance
structures to ensure that
they support community-
based activity. 
Paragraph 126 - As part of the
council’s efforts to encourage
communities to participate
across South Lanarkshire, it
should review existing
governance structures to
ensure that they support
community-based activity.
This should include
consideration of whether these
arrangements help to build
community capacity and
support people to be more
active in their community. The
review should include a
consideration of whether
further changes are required
to the role and remit of area
committees.
Action 8.1
Linked to the review of CPP governance (action
7.1), the council will undertake a review of existing
governance structures to ensure they support
community-based activity. 
The review will be wide-ranging in scope and
include: 
• New approaches to community-based activity,
including people and place based work
• The role and remit of area committees
• The role of the CPP in supporting community-
based activity 
Lead officer: CPET Manager   
March 2020 
Management should
formulate a digital inclusion
strategy to complement the
council’s digital strategy. 
Paragraph 155 - Our public
focus group identified some
concerns related to digital
exclusion as more services
move online. Research in this
Action 9.1
A strategy will be prepared outlining a programme
of work to look at causes of digital exclusion and
consider how the council and partners can address
these.  This will be informed by, and support, other
council initiatives including neighbourhood planning,
tackling poverty, economic development and
employability. 
Lead officer: Head of IT 
February 2020 
20

Page 21

BVAR recommendation Agreed action (per Council meeting 26/06/2019) Timescale
area has found that a
significant proportion of people
who cannot access digital
services come from the most
deprived and vulnerable
groups (referred to as the
‘seldom heard’ in the council’s
Community Engagement
Framework). Tackling this
issue could be helpful in
addressing the CPP’s
objective of ‘tackling
deprivation, poverty, and
inequality’. The council’s
digital strategy makes no
mention of the problem of
digital exclusion. Although the
council has some
arrangements in place to
address digital exclusion,
there is no overarching
strategy and corporate
approach to tackling this
issue. The council should
prepare a digital inclusion
strategy to complement its
digital strategy.  
Management should
implement revised
arrangements for
community engagement to
improve how it is used to
shape services. Consistent
and high-quality
consultation across all
services should be part of
this. 
Paragraph 160 - The council
has recognised that while
current arrangements have
some strengths there is a
need to fundamentally revise
its approach to community
participation and engagement.
This should include a focus on
the different needs of rural and
urban communities across
South Lanarkshire.
Paragraph 162 - There is
variability in the quality of
consultations, including some
instances where the timing of
the consultation and the type
of questions being asked
limited the quality of the
results. The council accepts
that they need to improve the
consistency of consultation
quality and advised us that
this is a key priority for the
new Community Participation
and Empowerment Team.
Action 10.1
Recognising the need for improved engagement
with communities and devolved decision making,
the council established a new Community
Participation and Empowerment Team (CPET)
during 2018-19. 
The Team is undertaking a range of work, including: 
• A review of consultation activity across the
council
• Development of a new engagement strategy
• Implementation of a place based approach to
community engagement, including the further
development of neighbourhood plans.
• An awareness raising campaign which will
include social media, web content and targeted
communications. 
A review of the progress made under the first year
of this activity will be undertaken and reported to
elected members by March 2020 
Lead officer: CPET Manager   
March 2020 
21

Page 22

Appendix 2: Annual BV Audit Actions 2023/2024 to 2024/2025 
2024/2025 Recommendations from the BV Thematic Report 
Matter giving rise to
recommendation
Recommendation Agreed action
Transformation
ambition 
The council has
significant budget savings
to make over the next
three years and beyond
and is aware that it must
explore further options for
transformation to help
bridge its funding gap and
improve outcomes for the
people of South
Lanarkshire. 
There is a risk that the
council may not be able to
deliver sustainable
services if the required
savings are not achieved. 
The council should
ensure its plans for
transformation are
sufficiently ambitious to
ensure that it can
continue to deliver
sustainable services,
prioritising
transformational activities
that will deliver the most
impact and contribute to
reducing the budget gap.
The Council continues to
progress a long term
schedule of
transformational reviews
which run in parallel with
the Budget process, in
order to maximise the
impact on the Budget
Gap.
Resourcing
transformation
The council has advised
that delivering
transformation is part of
the jobs of managers,
heads of service and
directors and the council
has periodically hired
external support to help
capacity. It has an officer
in place to support project
teams with the
administrative tasks of the
transformation
programme. There is a
risk that the council’s
Transformational Change
Programme will lose
momentum if it does not
have the sufficient
dedicated resource to
drive the activity required. 
The council should
assess whether its
arrangements for
resourcing transformation
activities are sufficient to
drive the scale and pace
of change required in
future.
The role of senior officers
in the Council includes
managing change and the
work around
transformation forms part
of that role. The
arrangements for
resourcing transformation
across the Council will
continue to be monitored,
and as is currently the
case, additional resources
will be deployed as and
when required. 
22

Page 23

Demonstrating the
impact of community
engagement on
transformational
activities 
The council has shared
examples of how it has
engaged or consulted
with communities in
relation to its
transformational reviews
and budget process. It is
unclear what specific
changes have been made
as a result of this
engagement as this has
not been clearly
demonstrated. There is a
risk that the council is not
viewed to have
considered community
views when prioritising
which transformational
projects to be taken
forward.
The council should
ensure it demonstrates
how engagement with
communities, including
vulnerable groups, has
informed planned
changes to services.
The Council will consider
adding a final stage to the
Budget Consultation
process for the 2026/2027
exercise, to ensure
outcomes are fed back to
communities. This will
include feedback on the
impact of consultation on
Transformational
Reviews.
Measuring the impact of
transformational
activities 
The council currently
focuses on establishing
the financial benefits of its
transformational activities
but does not routinely
separately track or report
on the impact on service
quality or outcomes for
service users in relation to
these transformational
activities. There is a risk
that, when prioritising
which transformational
activities to take forward,
the council does not have
adequate information on
impact to make a fully-
informed decision.
The council should
prioritise establishing a
framework that identifies
and monitors the
estimated and realised
impact to date of its
transformation work,
including on service
delivery and on outcomes
for service users. It
should report to CMT and
elected members on both
the financial and non-
financial impact of the full
range of its
transformational activities.
The Council will develop a
framework to capture
estimated and actual
impacts from
transformation activities.
An annual report will be
produced which will
provide a summary of the
outcomes from the
Transformational Review
Programme. 
23

Page 24

2023/2024 Recommendations from the BV Thematic Report 
Issue/risk Recommendation Agreed management
action/timing
5. Corporate level
workforce strategy
supported by clear
reporting on actions
The council does not
have a corporate level
workforce strategy. The
council level workforce
plan does not include or
refer to workforce data,
such as the age profile
of its workforce, the
number of casual staff
used or indicators of
staff wellbeing. Nor does
it include any
information on what it is
currently doing to
address any workforce
capacity issues or how it
plans to develop its
future workforce.
Risk – There is a risk that
the council is not using
workforce data to inform
workforce planning that
links to its strategic
priorities.
The council should
develop a corporate level
workforce strategy to
demonstrate a clear link to
the Connect Council Plan
2022-27. The council
should build on the
workforce planning to date
and implement a more
strategic, data-driven
approach to workforce
planning, with SMART
action plans, setting out
how Council level and
service level actions are
being progressed
Management response
The council will
complete an updated
Workforce Strategy for
2025-2027 with
accompanying
workforce plans to align
to the council Plan
Connect Business
Planning Cycle.
The council will create a
strategic workforce plan
for 2025– 2027 to align
with the council plan and
will also create
workforce plans for this
period and reference the
data analysis and
findings more clearly to
show both the high-level
actions and specific
resource actions. 
6. Digital technology
The council is at an
early stage in
establishing links
between workforce
planning and digital
technology
Risk – There is a risk that
the workforce planning is
not fully utilising the
benefits of digital
technology.
The council should develop
measures to capture and
monitor the impact of digital
technology on workforce
productivity and service
outcomes. It should also set
out how it expects digital
technology to shape its
future workforce.
Management response
The council will include
links in the 2025-2027
workforce strategy and
plans to digital
technology. The council
will include measures to
capture and monitor the
impact of digital
technology. 
24

Page 25

7. Digital Exclusion
Digital inclusion is one of
21 principles set out in
the Digital Strategy
2022-27 and is also one
of eight themes. The
council is progressing a
number of initiatives to
support digital inclusion.
Risk – There is a risk that
without a SMART action
plan to monitor progress
the council cannot
demonstrate it is
achieving the principles
set out in the Digital
Strategy.
The council should
develop an action plan to
allow it to monitor
progress in addressing
digital exclusion in its
workforce and for its
citizens.
Management response
The council will develop
an action plan within its
workforce plans that will
detail the next steps in
progressing digital
inclusion in its
workforce. For its
citizens, this will be
captured within the
digital strategy action
plans. 
2022/23 Recommendations from the BV Thematic Report 
Issue/risk Recommendation Agreed management
action/timing
Fairer Scotland
Assessment 
The Fairer Scotland Duty
came into force from 1
April 2018. It places a legal
responsibility on local
authorities to actively
consider how they can
reduce inequalities of
outcome caused by
socioeconomic
disadvantage, when
making strategic decisions.
Risk – There is a risk that
the Council is not fully
complying with the Fairer
Scotland Duty.
The Council should
continue its work to
embed its Fairer Scotland
duties by completing and
referencing Fairer
Scotland assessments in
council papers, strategies
and plans. It should also
check all assessments are
listed online.
Management
Response: 
We will continue to
embed Fairer Scotland
duties, and remind all
officers on the Council’s
Fairer Scotland Duties
and the use of Fairer
Scotland Assessments
by reissuing the guidance
and arranging further
training as appropriate.
We will ensure that
reference to Fairer
Scotland assessments
are made in committee
reports (where carried
out). All Fairer Scotland
Assessments will be
posted online. 
25

Page 26

Ongoing support for
Elected Members 
In May 2022, the Council
put in place a
comprehensive induction
programme. Committee
members feel
overwhelmed by the
volume, complexity and
technical nature of some
committee papers. Risk –
There is a risk that the
current suite of training is
not tailored to the
individual needs of Elected
members.
Officers should continue
to engage with elected
members to support their
training and development
requirements, including
specific training to build
confidence and allow
scrutiny.
Management
Response: 
The programme of
engagement with
members on training
requirements will
continue. The annual
needs assessments will
be carried out to inform
ongoing training plans. 
26

Page 27

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 24 February 2026
Report by: Executive Director (Finance and Corporate
Resources)  
Subject: Transformational Reviews – Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Transformational Reviews that are part of the Council’s
Transformational Change Programme for the year 2025/2026 and beyond 
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):- 
(1) that the update on the Transformational Reviews be noted:
[1rec
3. Background
3.1. In order to drive continuous improvement and efficiencies, and to support the
2025/2026 to 2027/2028 Revenue Budget Strategy, the Council embarked on a
programme of Transformational Change to manage the significant Budget Gaps facing
the Council over these 3 years. The programme builds on the work undertaken over
many years, where service reviews have taken place and which have fed into the
savings options that Members have considered. 
3.2. The most recent update to this Forum on 25 November 2025 detailed the progress of
Cross-Cutting reviews, as well as Resource specific transformational reviews, to
identify savings in the year 2026/2027 and beyond. The savings identified from the
Reviews in that report were presented to the Executive Committee on 5 November
2025 for consideration as part of the 2026/2027 savings pack, with a view to reducing
the Budget Gap for that year. In total, the reviews included in the report proposed
combined savings of £3.042 million for 2026/2027. 
3.3. The Transformational Reviews continue to progress, and this report provides an
update on these Cross-Cutting reviews (Section 4) and Resource specific reviews
(Section 5) and references any savings proposed as part of the 2026/2027 Budget
Strategy. Part of this is the identification of a further £0.242 million of efficiencies for
inclusion in the 2026/2027 Budget Strategy (section 4.2). The updated savings
position as a result of these Transformational Reviews is summarised in Section 7.1,
Table 2, and now totals £3.284 million. 
4. Transformational Change Programme: Cross-Cutting Transformational Reviews
4.1. Each review is taken in turn with a summary of their current status.  
5
27

Page 28

4.2. Procurement:  An update presented to this Forum on 25 November 2025 noted that
efficiency opportunities totalling £0.801 million had been identified to date for
contribution to the 2026/2027 Budget Strategy. A further nine opportunities, totalling
£0.242 million, have now been identified and are detailed in Table 1. 
Table 1: Procured Spend Review – Further Identified Savings for 2026/2027 
Proposal Savings
(£m)
Furniture 0.039
Food 0.002
Catering Disposables 0.015
Catering Sundries 0.007
Ice Melt 0.004
Purchase Card Rebate TFS 0.027
Electrical Materials 0.029
Lighting Materials 0.040
Cable 0.079
Total 0.242 
4.3. To date, the efficiencies available from this review for contribution to the 2026/2027
Budget Strategy, total £1.043 million. 
4.4. In addition, and as noted previously, the trial of alternative bin supplies commenced in
Summer 2025, with an estimated efficiency of £0.060m, and is progressing, with new
bins for the pilot now in place for the recycling rollout in the Hamilton area. Bin
performance will be monitored for up to a year, to ensure the bins are tested during
both hot and cold temperature extremes and an update will be brought to this Forum
following the conclusion of the pilot. 
4.5. As reported previously, the Transformation Programme run by SOLACE /
Improvement Service includes a workstream for Procurement Collaboration within
Local Government, targeting Waste, Fleet and Digital. Procurement have attended all
sub-group sessions to discuss the project outcomes and Services have returned
requests for information by the Improvement Service.  Updates on the progress of this
joint work with SOLACE / Improvement Service and any efficiencies it realises, will
continue to be reported to Members. 
4.6. Overtime: This review of overtime practices and spend looks to reduce expenditure
and to remove / reduce the associated risks to employees as a result of overtime. This
includes a focus on reducing the need for overtime. The previous report noted that, as
a result of this review, a savings proposal of £0.991 million has been included in the
2026/2027 Budget Strategy. 
4.7. Resource overtime action plans have been created to meet the outcomes associated
with reducing overtime across the Council, and work remains ongoing to conclude any
outstanding actions.  
28

Page 29

4.8. As reported previously, these plans consist of agreed actions targeting areas such as
ensuring regular and recurring recruitment activity, the distribution of adverts to key
organisations and compliance with the Maximising Attendance Policy (to minimise
absence and reduce cover overtime). Alongside these general actions across all
Resources, actions specifically tailored to each Resource’s unique makeup and
requirements are also being implemented. 
4.9. Customer Engagement: A proposal is included in the 2026/2027 Budget Strategy to
move the Benefits and Revenues call centre to Customer Services with the financial
benefits expected to follow from a streamlining of the management structure and a
greater pooling of the call handling resource. This would allow efficiencies to be
achieved in 2026/2027 totalling £0.048 million, with a further £0.038m achievable in
2027/2028. 
4.10. The review remains ongoing and higher level of efficiencies are expected to be
generated through other areas of activity over the medium term. In order to deliver
improvements at pace whilst taking an evidence-based approach, there are two
concurrent workstreams underway covering: 
1) Continuous Improvement: This workstream focusses on change that can be
delivered without the significant investment of either time or technology. Areas
identified for continuous improvement include the previously reported Process
Review, as well as well as getting it right first time for the customer, issuing simpler
communication and designing services around user needs. 
2) Transformational Change: Areas of work noted in the previous report to this
Forum such as structural change and the introduction of new technologies, are
captured under this workstream, which focusses on greater levels of service
redesign. Underpinning the approach to delivering transformation change, a high-
level customer experience strategy is being developed which will set out the vision
and principles for delivering the customer experience across the Council. 
4.11. Further updates will be presented to this Forum as and when they become available. 
4.12. Digital Transformation: This review aims to ensure resources are suitably deployed
to priority projects across Resources to deliver maximum efficiency returns, and is
defined by three key areas of focus: 
1) Business Systems and Processes: projects and improvements to key corporate
and line of business applications
2) Workforce Productivity: focus on enabling and empowering staff to maximise their
effectiveness and digital literacy
3) Customer Engagement: clear and consistent Council-wide customer engagement 
4.13. A structured action plan is now in place, and significant progress has been made
across several key areas. Work to upgrade the Council’s website is underway, with a
redesigned platform planned to go live in Summer 2026. This will support better
customer engagement and streamline online services. Alongside this, the Copilot
Accelerator programme is helping staff test new AI powered tools, with early feedback
indicating time savings and improved outcomes.  
29

Page 30

4.14. Further initiatives include improving the quality of data and reporting, expanding digital
skills, using process modelling tools to identify efficiencies, progressing work on AI
and M365 adoption, and reviewing opportunities for financial savings through
improved systems and licensing. 
4.15. The majority of savings from this review are anticipated in future years, however a
saving of £0.030m is included in the 2026/2027 Budget Strategy as a result of the
refresh of the website technology contract.
4.16. Fleet: The standalone review of Fleet has now concluded, however work will continue
on a review of the Fleet Strategy, which will include a review of key strategic outcomes.
The annual Fleet Asset Management Plan will be prepared and published in parallel.
Fleet Services will also continue to engage with the wider programme of
Transformational Reviews in order to identify any fleet implications and savings, with
any updates to be reported through individual reviews as and when appropriate. 
4.17. Organisational and Management Structures: A review of management and
supervisory structures was carried out in order to align to the current Preferred
Operating Model and generate organisational benefits of enhancing efficiency,
consistency, and capacity across Council services, as well as identifying savings for
2026/2027 and 2027/2028. The aim of the current model is to resolve variations by
applying a consistent standard across all services. 
4.18. The outcome of the review has identified a number of efficiencies, totalling £0.900
million which are included in the 2026/2027 Budget Strategy.  As other reviews
progress, further consideration of management and organisational structures will be
made. If further changes are possible, these will form part of savings packs for future
years. 
4.19. Third Sector Review: This review saw the development of The South Lanarkshire
Third Sector Partnership Agreement, which sets out better ways of working together,
including a commitment by the Council to include the local third sector in strategic and
service delivery discussions. It was co-produced with the local third sector, alongside
a Third Sector Grants Policy that establishes clear and transparent processes for
payments from the Council to the sector. 
4.20. The review has now concluded as, following approval of both documents by the
Council’s Executive Committee on 5 November 2025 (link to report here), the new
partnership has now been signed on behalf of the Council, and by Voluntary Action
South Lanarkshire’s Chair and its Interim Chief Executive. 
4.21. Shared Services Review: The Council is currently engaging with SOLACE and the
Improvement Service across a number of workstreams as part of the national
SOLACE/IS Transformation Programme. To expand on this work further, a cross-
Resource review of shared service opportunities for SLC was undertaken throughout
Autumn / Winter 2025, with four key areas of activity being explored to determine the
potential for shared service arrangements: 
1. IT Services and the Digital Office
2. Personnel Service and Clyde Valley and Training
3. Providing Print Services for Other Organisations
4. Shared Services within Legal Services and Licensing and Registration  
30

Page 31

4.22. Updates on each area of review will be brought to the next meeting of this Forum. 
5. Transformational Change Programme: Resource Specific Reviews
5.1. Each review is taken in turn with a summary of their current status. 
5.2. Factoring: As reported previously, a full review of the Factoring Service provided to
owners of former Council Housing Stock, is being undertaken by Housing and
Technical Resources. At present this service provides a repairs and maintenance
service to owners.  It is delivered to 1,874 mixed tenure blocks and 329 wholly owned
blocks comprising of 8,161 owners and 5,623 SLC properties within East Kilbride,
Rutherglen and Cambuslang, Hamilton localities. 
5.3. The review will inform the future direction and culture of the Factoring Services
function, and provide options for a future service delivery model to deliver a high-
quality effective service. Consideration is being given to resourcing levels, staff
development, team structures and to ensuring processes are effective and efficient.
The findings of this work are currently being developed and will give consideration to
potential changes to the future service delivery structure. 
5.4. Long Term Estate Strategy (including Depot Rationalisation):  The development
of the Estate Strategy aims to support future public service delivery, encourage
collaboration with other public sector bodies, and guide decisions about investment,
rationalisation, co-location, and asset disposal. It prioritises a smaller, high-quality,
energy-efficient estate, facilitates net zero transition, promotes community asset
transfer when appropriate, and addresses financial pressures facing the Council and
SLLC. 
5.5. As reported previously, estate development is split into three inter-related phases with
progress noted as below: 
 Phase One: An initial review of data and the development of clear assessment
criteria to output an initial scoring of all properties within the estate. This phase is
now complete.
 Phase Two: Prioritising projects using agreed criteria, and identifying strategic
opportunities for regeneration and partnerships. This Phase is still evolving
through internal consultation, the data is pointing towards a series of early win
opportunities to deliver strategic opportunities through projects to catalyse
change, joined up regeneration, evolving partnerships and channel shift through
collaborations around local needs and outcomes. The results of this work will
identify where and when we will use the £24 million investment budget.
 Phase Three: The development of the Estate Strategy and an associated 10-
year Delivery plan. Phase Three is progressing, and a final report to the Executive
Committee is planned for June 2026. 
5.6. In terms of the Depot Rationalisation element of this Long-Term Estates Review, 61
properties were reviewed, resulting in a shortlist of 18 depots. A feasibility study will
analyse service needs, site layout, technical requirements, design options including
zero-carbon technologies, costs, funding, operational savings, and project risks. The
study will guide next steps, including design development and business case
preparation and updates will be shared with the Forum as available.  
31

Page 32

5.7. Planning and Regulatory: This review considered the delivery of services and the
methods in which stakeholders engage with the Planning and Regulatory Service.  As
reported previously, the review has identified potential savings for 2026/2027 from the
annual increase in fees (£0.172 million) and the introduction of discretionary charges
(£0.100 million). 
5.8. These savings, totalling £0.272 million, are included in the package of savings for
Members’ consideration towards the 2026/2027 Budget Strategy. This review has now
concluded. 
5.9. Property Services – Efficiencies and Income Generation: The review of Property
Services has now concluded with progress made across staffing, overtime reduction,
procurement, and in-house resourcing. 
5.10. Staffing restructures and span-of-control adjustments have contributed to corporate
savings, while the reliance on subcontractors is being reduced through the expansion
of in-house teams for electrical testing, kitchen upgrades and fencing works. The
recruitment process is on-going with an expectation that the majority of posts will be
recruited by the end of March 2026. Void performance has also improved, with
numbers reduced from a high of 411 in 2024 to consistently under 200 and average
to‑let times are now 19 days. 
5.11. In addition, work will continue on fleet assessment, depot locations and to expand the
skills of Building Services staff to take on additional renewable energy projects,
currently delivered by external specialist contractors. 
5.12. Routes to Work South (RTWS):  This organisation is a South Lanarkshire based
company limited by guarantee and a registered charity that delivers a range of
employability programmes on behalf of South Lanarkshire Council. RTWS was
established in 2001 and operates as an Arms-Length External Organisation (ALEO)
of the Council.  As an ALEO the Council can award contracts directly to RTWS through
the ‘teckal’ exemption without going through a competitive tender exercise. 
5.13. Given the changes in employability policy and in the funding landscape over recent
years, a review of the current delivery mechanism has been undertaken. A report on
the review’s findings is included as a standalone report on the agenda for this meeting
of the Forum for information. 
6. Employee Implications
6.1. 23 FTE posts are proposed to be removed as part of the savings proposals resulting
from these reviews (noted in Table 2).    
32

Page 33

7. Financial Implications
7.1. The financial implications of these reviews are summarised in Table 2.   
Table 2: Transformational Reviews – Proposed Savings for 2026/2027  
Reference Saving FTE
26/27
Saving
26/27
£m
M&O01 Procurement Review - 1.043
M&O02 Overtime Review - 0.991
M&O03 Organisational and Management Structures
Review 21.0 0.900
M&O06 Annual Increase to Planning and Building
Warrant Fees  - 0.172
M&O07 Digital Transformation Review - 0.030
M&O08 Customer Engagement Review 2.0 0.048
CER12 Planning – Introduction of Charges - 0.100 
Total Savings 23.0 3.284 
8. Other Implications
8.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources.  The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
8.2. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of an overspend
is managed through four weekly Investment Management Meetings. 
8.3. There are no implications for sustainability in terms of the information contained in this
report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
29 January 2026  
33

Page 34

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 26 June 2024
 Cross-Cutting Reviews – Update - Performance and Review Scrutiny Forum 27 August
2024 
 Transformational Reviews – Cross-Cutting – Update - Performance and Review
Scrutiny Forum 19 November
 Transformational Reviews - Update - Performance and Review Scrutiny Forum 04
February 2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 01 April
2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 17 June
2025
 Transformational Reviews - Update - Performance and Review Scrutiny Forum 19
August 2025
 Transformational Reviews – Update - Performance and Review Scrutiny Forum 25
November 2025 
List of Background Papers
 2026/2027 to 2027/2028 Revenue Budget Gap and Savings Proposals for 2026/2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601  (Tel: 01698 452601)
lorraine.o'hagan@southlanarkshire.gov.uk 
34

Page 35

Report
Agenda Item 
Report to: Performance and Review Scrutiny Forum
Date of Meeting: 24 February 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Transformational Review of Routes to Work South 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 to provide an update on the Transformational Review of Routes to Work South
(RTWS) 
2. Recommendation(s)
2.1. The Forum is asked to approved the following recommendation(s):-
[recs]
(1) that the contents of the report are noted; 
(2) that the proposal to take forward Option 5, being to maintain the Council
membership of Routes to Work South and the current Teckal arrangements and
reduce duplication between RTWS and the Council, as summarised in Section 6
of this report, and the associated actions as set out in Sections 7 and 8, as
approved by Executive Committee, be noted; 
(3) to note that Executive Committee granted delegated authority to the Executive
Director (Community and Enterprise Resources) to implement Option 5 and the
above-mentioned associated actions, in consultation with the Head of
Administration and Legal Services; and
(4) to note that a report seeking approval of the appointment of four elected members
and 6 independent co-opted directors to the board of Routes to Work South will
be brought to a future meeting of the Executive Committee. 
3. Background
3.1. RTWS is a South Lanarkshire based company limited by guarantee and a registered
charity that delivers a range of employability programmes on behalf of South
Lanarkshire Council (SLC).  RTWS was established in 2005 and operates as an Arms-
Length External Organisation (ALEO) of the Council.  As an ALEO the Council can
award contracts directly to RTWS through the established Teckal exemption without
a competitive tender exercise. 
3.2. In 2025/2026, RTWS is delivering a range of programmes on the Council’s behalf with
a total value of £2,663,000.  All programmes are funded by external employability
funding sources including Scottish Government No-one Left Behind, UK
Government’s Shared Prosperity Funds and Renewable Energy community benefit
funds.  A summary of RTWS’s contracted delivery in 2025/2026 is provided at
Appendix 1.  
6
35

Page 36

4. Transformational Review
4.1. A transformational review of RTWS has been undertaken which was prompted by: 
 significant changes in the employability policy and funding landscape in recent
years
 a reduction in RTWS’ access to non-Council employability funds which has
resulted in the Council being the sole funder of RTWS
 a recognition that there are some areas of duplication between the Council and
RTWS
 a desire to ensure that RTWS’ board structure and relationship with the Council is
fit for purpose
 the restructure of Employability Services and move from Finance and Corporate
Resources and Education Resources to Community and Enterprise Resources 
4.2. The review included engagement with a range of stakeholders: 
 RTWS board and management team
 Employability management team
 South Lanarkshire Local Employability Partnership 
5.  Findings 
5.1. Engagement with stakeholders and wider analysis identified several findings: 
5.2. Performance: RTWS delivers employability services of a high standard which meet
the needs of participants and achieve an appropriate level of outputs and outcomes to
support local people into sustainable employment.  In 2024/2025, 1,382 participants
were supported with 536 people progressing into employment. 
5.3. Partnerships: RTWS have positive partnership relationships with South Lanarkshire
Local Employability Partnership (SLLEP) members.  They are a valued local
employability partner and the service they deliver is considered to be of a high quality. 
5.4. Duplication: The review identified aspects of duplication between the programmes
delivered by RTWS and those delivered on an in-house basis by the Council. 
Duplication is most pronounced in the Tackling Child Poverty programmes set out
below which are both supported by Scottish Government No-one Left Behind funding: 
 Making it Work (RTWS): keyworker-based programme providing one-to-one
support, employability skills and training to eligible parents
 Supporting Families (SLC): keyworker-based programmes providing early-stage
keyworker support to parents through close partnership working with targeted
primary schools and early years centres 
5.5. RTWS Board, ALEO Status and Independence: There is a need to review the board
structure and relationship between the Council and RTWS as an ALEO, to ensure
arrangements are fit for purpose and ensure an appropriate balance between RTWS’s
independence as a charity and the level of control required as an ALEO.  Further
details and actions are provided at section 7. 
5.6. Financial control: While effective performance management processes are in place,
there is a need to increase the Council's financial control of RTWS to ensure the
Council has the necessary comfort that Best Value is being secured. 
36

Page 37

5.7. RTWS pay and management structure: RTWS salary scales are not in alignment with
those of the Councill and an element of performance related pay is in place. 
6. Options Appraisal 
6.1. An Options Appraisal was carried out which considered the five options below.  A
summary of the Options Appraisal is included at Appendix 2. 
Option 1 Retain the status quo.
Option 2 Withdraw Council membership of RTWS and deliver all services in-
house
Option 3 Withdraw Council membership of RTWS and competitively tender the
current services
Option 4 Withdraw Council membership of RTWS and deliver a blend of in-
house and procured services
Option 5 Maintain Council membership of RTWS and current Teckal
arrangements and reduce duplication between RTWS and the
Council. 
6.2. The appraisal identified Option 5 as the preferred option and it was agreed that the
review be taken to Executive Committee for a decision.  The implementation of Option
5 will include addressing the duplication set out at section 5.4.  This will involve ceasing
to fund the Making it Work programme and expanding the focus of the in-house
Supporting Families programme.  This will create a single keyworker-based Tackling
Child Poverty programme, reducing duplication and costs and increasing the reach of
parental employability support to communities across South Lanarkshire. 
7. Additional Matters
7.1. The review also considered additional actions to address the issues identified at
section 5:  
7.2. RTWS Board, ALEO Status and Independence: As an ALEO of the Council, RTWS
can be awarded a contract directly through the established ‘Teckal’ exemption.  This
requires three conditions to be met as set out below: 
 the Council exercises control over RTWS similar to that it exercises over its own
departments;
 RTWS carry out over 80% of their activities for the Council; and 
 there is no private sector ownership in RTWS. 
7.3. This requirement can potentially come into conflict with RTWS’ status as a charitable
organisation which requires a level of operational independence from the Council. 
7.4. The RTWS board is currently made up of two Council appointed directors (one
Councillor and the Employability Manager) and four co-opted directors, including the
chair.  The current chair has indicated his intention to resign from the board.  The
review has highlighted some potential conflicts of interest for Council officers
undertaking director roles in ALEOs.  The Articles currently permit up to 10 directors
including the chair, four appointed by the Council and six co-opted.  
37

Page 38

7.5. The following changes to the RTWS Articles of Association will now be made: 
 That RTWS’s Articles of Association are amended to ensure that a majority of
directors are independent of the Council.  The make up of the board will include
six independent, co-opted directors and 4 Council appointed directors.
 That the Articles are amended so that the five co-opted directors be appointed by
the Council rather than the board.  The board of directors will appoint the chair.
 That the provisions in the Articles related to board membership are amended so
that Council board positions will be filled by elected members rather than officers
to minimise the risk of conflicts of interest. 
 Four elected members will be identified for appointment, one from each Council
locality.
 The provision in the Articles relating to conflicts of interest will be amended so that
should there be circumstances where Council appointed directors are unable to
exercise their duty to put the interests of the charity first due to their duties to the
Council, they must withdraw from the matter in question. 
 A recruitment campaign to identify a new chair and six co-opted directors will be
undertaken.  Should they wish to, the current independent, co-opted directors may
remain in place. 
7.6. Financial control: The Teckal contract between the Council and RTWS allocates
funding based on the delivery of specific programmes, with RTWS having a degree of
flexibility to allocate that funding across the programme to operational delivery, client
costs, training and non-delivery costs including administration and management.  To
ensure the Council secures Best Value and bring the funding arrangements with
RTWS closer to the processes in place for Council services, it is recommended that
the Teckal contract for 2026/2027 includes increased financial monitoring by the
Council, including monitoring of spend against specific budget headings.  This will
include an allocation against budget headings for staffing / delivery costs,
management and administration costs and learning and training. 
7.7. Pay and management structure: RTWS do not follow the Council’s pay grades and
have their own renumeration policy in place.  The policy includes a salary review
process which sets individual salaries based on factors including performance,
behaviours and continuous professional development. 
7.8. As an ALEO with independent charitable status, the Council cannot directly impose a
management structure or salary scale on RTWS.  However, as set out above, the
Teckal contract for 2026/2027 will allocate funding including allocations for delivery
costs, non-delivery costs and management costs.  The funding allocated to
management costs through the contract may require the RTWS board and
management team to either identify savings or identify alternative sources of funding,
limited to 20% of overall income as set out in the requirements at 7.2. 
8. Next Steps
8.1. Following Executive Committee approval, the review of RTWS has been concluded
with Option 5 progressed including: 
 the removal of the Making it Work programme from April 2026
 amendments to the RTWS Articles as set out at section 7.4
 the development of a Teckal contract with increased financial monitoring for
2026/2027  
38

Page 39

 undertaking a recruitment campaign to identify a new chair and six co-opted
directors 
 the identification of four elected members to take up director positions on the
RTWS board 
8.2. Following Executive Committee approval, the RTWS Board has been formally advised
of the review outcome.  It will be for RTWS Board to formally accept, or otherwise any
Teckal contract for 2026/2027. 
8.3. A report seeking approval of appointments of elected members and independent co-
opted directors will be brought to a future meeting of the Executive Committee. 
9. Employee Implications
9.1. The implementation of Option 5 will require the TUPE of between 6-8 RTWS
employees to the Council and this will be taken forward with support from Personnel
Services. 
10. Financial Implications
10.1. There are no savings to the Council as part of this review as RTWS’s funding is entirely
met from external funding sources.  External grant funding, including Scottish
Government No-one Left Behind and UK Government Shared Prosperity Funds is in
place for 2025/2026.   
10.2. The reduction in management costs and removal of the Making it Work programme
will reduce the RTWS allocation by £500,000 from April 2026.  It is anticipated that the
expanded Supporting Families programme will require funding of £300,000 per year,
resulting in £200,000 funding being available for the Council to be allocated to other
eligible employability activities (subject to similar levels of external funding being
available). 
11. Climate Change, Sustainability and Environmental Implications
11.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained within this report. 
12. Other Implications
12.1. The are no risks or other implications arising from this report. 
13. Integrated Impact Assessment and Consultation Requirements
13.1. An integrated Impact Assessment has been completed and is available at the
following link: 
Transformational Review – Routes to Work South Plans and policies - South
Lanarkshire Council 
13.2. The review has included consultation with a range of stakeholders including
participants, Routes to Work South board and management team and employability
partners. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
16 January 2026  
39

Page 40

Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work to recover, progress and improve
 Our children and young people thrive
 Thriving business, fair jobs and vibrant town centres
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Alison Brown 
Head of Enterprise and Sustainable Development
Tel:  01698 454700
Email:  Alison.Brown@southlanarkshire.gov.uk 
40

Page 41

Appendix 1 
RTWS Contracted delivery 2025/26  
Programme  Description Value
Gateway to
Employment 
Keyworker-based employability
programmes targeted at adults with
barriers to employment  £1,013,000
Gateway to
Employment
(Health/intensive)
Intensive support programme for
adults with long-term health barriers to
employment £250,000
Making it Work 
Keyworker based training and support
targeted at parents  £500,000
Reach and Impact 
Groupwork and employability training
programme targeted at young people
aged 16-19 £300,000
RISE 
Confidence building and personal
development groupwork targeted at
school pupils at risk of becoming
unemployed.  £200,000
EK Hub
Contribution to running costs of the
employability hub in East Kilbride
centre. 100,000
Aspire 
Provision of Keyworker support to the
Aspire programme 
100,000 
What I Need
Pilot programme to engage
economically inactive people in early-
stage employability activity in targeted
neighbourhoods  200,000
Total  2,663,000 
41

Page 42

Appendix 2 
Option Appraisal Summary 
The options appraisal scored the 5 options across the following areas: 
• Customer needs 
• Level of financial saving 
• Ease of implementation 
• Employee impact 
• Governance / compliance 
• Reputation / best practice 
• Performance 
• Risk 
Option  Score  
1. Retain the status quo  32 This option is not preferred as it does not
address duplication, provide opportunities for
financial efficiencies or address the relationship
between RTWS and the Council.
2. Withdrawn Council
membership of
RTWS and deliver all
services in-house 
36 This option would significantly reduce
duplication and reduce the cost of the delivery,
providing opportunities for the delivery of
additional activity. 
However, the option is not preferred as it would
require the transfer of all RTWS employees to
the Council. As the funding that supports the
delivery is external and awarded on an annual
basis this would create significant financial risk
for the Council were the funding to be reduced
in the future. 
3. Withdraw Council
membership of
RTWS and
competitively tender
current services
23 This option is not preferred as RTWS’ activity
is supported by temporary external funding
which is awarded to the Council on an annual
basis. This along with late grant awards may
result in periods of non-delivery. There is also
a risk that procured services could be less
effective than those currently delivered by
RTWS.
4. Withdraw Council
membership of
RTWS and deliver a
blend of in-house and
procured services 
39 To avoid the funding challenges identified at
option 3, this option would be likely to require
the delivery of all keyworker-based
programmes on an in-house basis. Although
reducing duplication, this would involve the
TUPE of significant numbers of RTWS
employees to the Council with the associated
risks. 
5. Maintain Council
membership of
RTWS, and reduce
duplication between
RTWS and the
Council 
55 This is the preferred option.  It maintains the
delivery of RTWS programmes which are
achieving positive outcomes for participants
while addressing the duplication between the
Council and RTWS. 
42

Page 43

The option will reduce delivery costs, providing
opportunities to deliver additional activity within
the Tackling Child Poverty programmes. 
The option is likely to require the TUPE of 6-8
RTWS employees to the Council and while
there is some risk associated due to the
external funding this is low given current
forecasted grants and the turnover of
employees within the Employability Service.   
The implementation of recommendations from
the legal review will ensure the balance
between RTWS’s status as an ALEO and
charitable organisation is maintained. 
43

Page 44

44