Agenda Document Pack - Financial Resources Scrutiny Forum - 01/09/2022

South Lanarkshire Council · 1 September 2022
Back to Financial Resources Scrutiny Forum — 1 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 24 August 2022 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 01 September 2022
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Mathew Buchanan, Colin Dewar, Grant Ferguson, Ross Gowland, Gavin Keatt, Richard Lockhart,
Julia Marrs, Monique McAdams, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr

Page 2

BUSINESS 
1 Declaration of Interests 
Item(s) for Decision 
2 Appointment of Chair
To appoint Chair of Financial Resources Scrutiny Forum 
3 Appointment of Depute Chair
To appoint Depute Chair of Financial Resources Scrutiny Forum. 
Item(s) for Monitoring 
4 Capital Budget Monitoring 2021/2022 - General Fund Capital Programme
Report dated 16 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
5 - 12 
5 Capital Budget Monitoring 2021/2022 - Housing Capital Programme
Report dated 16 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
13 - 18 
6 Capital Budget Monitoring 2022/2023 - General Fund Capital Programme
Report dated 16 August 2022 by the Executive Director (Finance and
Corporate Resources.  (Copy attached) 
19 - 38 
7 Capital Budget Monitoring 2022/2023 - Housing Capital Programme
Report dated 16 August 2022 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
39 - 46 
8 Revenue Budget Monitoring 2021/2022
Report dated 24 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
47 - 58 
9 Revenue Budget Monitoring 2021/2022 - Detailed Resource Analysis
Report dated 24 August 2022 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
59 - 142 
10  Revenue Budget Monitoring 2022/2023
Report dated 24 August 2022 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
143 - 148 
11  Revenue Budget Monitoring 2022/2023 - Detailed Resource Analysis
Report dated 24 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
149 - 198 
Urgent Business 
12  Urgent Business
Any other items of business which the Chair decides are urgent.

Page 3

For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk

Page 4

No embedded text on this page.

Page 5

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2021/2022 - General Fund
Capital Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
i update members of the Financial Resources Scrutiny Forum on the final outturn
position of the Council’s General Fund Capital Programme for the period covering
1 April 2021 to 31 March 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the final outturn position on the 2021/2022 General Fund Capital
Programme be noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 31 March 2022 from
a financial perspective.   
3.2. Appendix A shows the financial position of the General Fund Capital Programme. 
Any physical progress update for projects carried forward into financial year 2022/23
will be picked up as part of the new year monitoring report. 
4. General Fund Capital Programme Final Outturn 2021/2022
4.1. The General Services Capital Programme for 2021/2022 totalled £72.732 million, This
revised programme consists of the base budget plus carry forward projects and
adjustments which have been agreed by the Executive Committee up to and including
its meeting on 2 March 2022.      
4.2. The total spend on Capital of £61.587 million is shown in Appendix A.  This is
compared to the budget of £72.732 million and results in an underspend of £11.145
million. This underspend relates to projects within Community and Enterprise
Resources (£7.218m), Education Resources (£1.121m), Finance and Corporate
Resources (£1.190m), Housing and Technical Resources (£1.317m) and Social Work
Resources (£0.299m). 
4.3. Overall, the programme underspend is due to the timing of project spend.  A list of the
main projects which are responsible for the underspend are detailed below:   
Community and Enterprise Resources:  Place Based Investment Programme
(£1.617m), Hamilton HUB – New Cross Shopping Centre (£0.970m), Vacant and
4

Page 6

Derelict Land (£0.563m), Contribution to Horsley Brae (£0.400m), Roads Participatory
Budgeting (£0.329m), Roads Structures (Mousemill Rd, Clyde, Ponfeigh, Daer and
Scrogton) (£0.473m), Cycling, Walking and Safer Streets (£0.238m), Cathkin Bypass
(£0.328m) and Greenhills Road (£1.081m).   
Education Resources: St Charles’ Primary School Extension (£0.141m), Newton
Farm Primary School Extension (£0.475m), St Mark’s Primary School, Hamilton –
Extension (£0.152m), Early Years 1,140 Hours (£0.379m) 
Finance and Corporate Resources: IT Infrastructure Refresh (£0.401m), Digital
Connectivity (£0.275m), Caird Data Centre (£0.174m), Audio Visual Upgrade
(£0.389m), Climate Change / Digital Transformation Fund (£0.325m) and offset by
better than anticipated progress on Oracle Fusion (£0.790m) 
Housing and Technical Resources: Prioritised Urgent Investment (£0.249m),
Lifecycle Replacement Schools (£0.246m), Community Facilities Fund (£0.100m),
Civic Centre Fabric Upgrade (£0.317m) and Central Energy Efficiency Fund
(£0.367m). 
Social Work Resources:  Care Home Replacement – Blantyre (£0.131m),
Community Alarms (£0.021m) and Replacement SwIS Plus System (£0.148m). 
4.4. The majority of these projects will continue into 2022/2023.  These projects are listed
in Appendix B.   
4.5. Year End and Accounting Adjustments:  Accounting Regulations mean that
adjustments are required to report spend correctly as either Capital or Revenue for the
purposes of publishing our Annual Accounts.  This includes where spend from the
Capital Programme is on assets that are not owned by the Council (for example
Shawfield Industrial Estate spend) or where spend must be classed as Revenue due
to the nature of the spend.  This adjustment has no physical impact on projects – it is
an accounting entry only.   
4.6. From reviewing the Council’s Revenue and Capital spend, £1.627 million of capital
spend is required to be recorded as Revenue spend. Conversely, £0.378 million of
revenue spend should be recorded as Capital. These transfers mean that for the
purpose of publishing our Annual Accounts only, there is capital spend of £60.338
million.  The funding sources for this spend are detailed in Appendix A (Page 2). 
4.7. Carry Forward to 2022/2023:  As noted in 4.2, the year-end underspend is £11.145
million.  This £11.145 million will carry forward into financial year 2022/2023. 
4.8. The overall base programme for 2022/2023, including this carry forward of £11.145
million, is included in a separate report to this meeting.  This separate report reviews
the programme for the coming year detailing the overall level of spend achievable.  
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are contained in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.

Page 7

8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an 
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 August 2022 
Link(s) to Council Values/Ambitions/Outcomes
ƒ  Accountable, Effective, Efficient and Transparent 
Previous References
ƒ Executive Committee, 2 March 2022
ƒ Executive Committee, 29 June 2022 
List of Background Papers
ƒ Capital Ledger prints to 31 March 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail:  jackie.taylor@southlanarkshire.gov.uk

Page 8

APPENDIX A       
(Page 1)
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2021/22       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2021 TO 31 MARCH 2022 
Resource Name 
Annual
Budget
£000 
2020/21
C/F
£000
Previous
Slippage
/Adjs
£000 
Approved
Budget
£000 
2021/22
Adjs
£000 
2021/22
Slippage
£000 
Total
Budget
£000 
Estimate
to Date
£000 
Actual
£000
Community & Enterprise 
Facilities, Waste &
Grounds
3,124 6,860 (6,609) 3,375 1,350 (1,748) 2,977 2,977 2,176
Enterprise and
Sustainable
Development
18,901 5,760 (11,502) 13,159 200 (2,916) 10,443 10,443 7,217
Roads,
Transportation and
Fleet
18,198 3,153 8,850 30,201 1,691 (3,409) 28,483 28,483 25,292 
Resource Total 40,223 15,773 (9,261)       46,735 3,241 (8,073) 41,903 41,903 34,685          
Education
1,140 Hours 7,734 (1,379) 180 6,535 876 (3,750) 3,661 3,661 3,282
Community Growth 
Areas
5,091 (1,053) (267) 3,771 - (1,550) 2,221 2,221 2,076
Growth and
Capacities
2,647 1,330 1,803 5,780 - (550) 5,230 5,230 4,558
ICT Developments 1,905 1,599 356 3,860 732 (660) 3,932 3,932 3,901
Other 171 254 29 454 - - 454 454 559 
Resource Total 17,548 751 2,101 20,400 1,608 (6,510) 15,498 15,498 14,376          
Finance & Corporate
IT Services 11,500 (6,938) (1,786) 2,776 400 - 3,176 3,176 1,987 
Resource Total 11,500 (6,938) (1,786) 2,776 400 - 3,176 3,176 1,987          
Housing and Technical
Office Accom 7,710 2,076 (1,958) 7,828 (455) (1,480) 5,893 5,893 4,943
Private Housing
Scheme of
Assistance
1,000 - (1,000) - - - - - -
Other Housing 424 251 (116) 559 349 - 908 908 542 
Resource Total 9,134 2,327 (3,074) 8,387 (106) (1,480) 6,801 6,801 5,485 
Social Work
Care Facilities 6,539 215 (554) 6,200 - (1,200) 5,000 5,000 4,869
Other 300 100 168 568 - (214) 354 354 185 
Resource Total 6,839 315 (386) 6,768 - (1,414) 5,354 5,354 5,054 
Overall Total 85,244 12,228 (12,406) 85,066 5,143 (17,477) 72,732 72,732 61,587

Page 9

APPENDIX A       
(Page 2)
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2021/22       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2021 TO 31 MARCH 2022 
Expenditure
2021/22
Revised
Budget
2021/22
Actual to
31/03/22  
£m £m   
General Fund Programme (from Appendix 1) 72.732 61.587
Accounting Adjustments (Sections 4.4 and 4.5):     
Less:  Transfers to Revenue  (1.627)   
Add:  Year End Transfers to Capital  0.378   
2021/2022 Outturn Position (Accounting Basis only) 72.732 60.338   
Income 
2021/22
Actual to
31/03/22  
£m
Prudential Borrowing  10.196
Developer Contributions  2.738
Partners (Including SPT, Sustrans, Clyde Wind Farm and
Renewable Energy Fund) 
5.133
Scottish Government:   
- Capital Grant  24.174 
- Cycling, Walking and Safer Routes  1.162 
- Vacant and Derelict Land  0.018 
- Early Years 1,140 Hours  2.024 
- Regeneration Capital Grant   0.510 
- Town Centre Regeneration Fund  1.597 
- Place Based Investment Programme  0.161 
- Gaelic Capital Fund  0.038 
- Electric Vehicle Infrastructure  - 
- Gypsy Travellers  0.107 
- CO2 Monitors  0.299 
- NSS Tec  0.040
Glasgow City Region City Deal  9.780
Specific Reserves  0.618
Revenue Contribution  1.743   
TOTAL FUNDING  60.338

Page 10

APPENDIX B
(Page 1) 
SOUTH LANARKSHIRE COUNCIL      
CAPITAL EXPENDITURE 2021/2022       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2021 TO 31 MARCH 2022 
Projects which will Carry Forward into 2022/23
Project Name Project Type
Community and Enterprise Resources
Allotments Infrastructure
Allotment & Raised Beds, Strathaven Infrastructure
Alexander Hamilton Memorial Park – Woodland
Management
Infrastructure
Greenhall Replacement Bridge Infrastructure
Switched On Fleet Infrastructure
Place Based Investment Programme Regeneration
Hamilton HUB - New Cross Shopping Centre  Regeneration
Abington Campus for Enterprise Regeneration
Vacant and Derelict Land (mainly Cunningar and
Cunningar Allotments)
Regeneration
Glengowan Primary School Extension 
(Glasgow City Region City Deal Programme)
Extension /Adaptations
Calderside Academy
(Glasgow City Region City Deal Programme)
Extension / Adaptations
Lanark Road Signalisation 
(Glasgow City Region City Deal Programme)
Roads
Uddingston Grammar
(Glasgow City Region City Deal Programme)
Extension
Horsley Brae Roads
Roads Structures (Mousemill Rd, Kirkfieldbank, Clyde,
Daer & Scrogton) 
Roads
Participatory Budgeting Roads
Cambuslang Station Park and Ride Roads
Cycling Walking & Safer Routes Roads
Sustrans - Various Roads
Electric Vehicle Charging Infrastructure Charging Stations
Cathkin Bypass
(Glasgow City Region City Deal Programme)
Compensation Only
Stewartfield Way
(Glasgow City Region City Deal Programme)
Roads
Greenhills Road
(Glasgow City Region City Deal Programme)
Roads
Education Resources
St Charles Primary School – Extension Extension
Newton Farm Primary School – Extension Extension
St Mark’s Primary School, Hamilton – Extension Extension
Lightburn ELC 
(previously Mill Road, Cambuslang)
Parking Only
Clyde Terrace, Bothwell New Build

Page 11

APPENDIX B
(Page 2)
SOUTH LANARKSHIRE COUNCIL      
CAPITAL EXPENDITURE 2021/2022       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2021 TO 31 MARCH 2022 
Projects which will Carry Forward into 2022/23
Project Name Project Type 
Finance and Corporate Resources
IT Infrastructure Refresh Infrastructure
Digital Connectivity Infrastructure
Caird Data Centre Infrastructure
Audio Visual Upgrade - Council Chambers and
Committee Room 1
Infrastructure
Climate Change / Digital Transformation Fund  Infrastructure
Housing and Technical Resources
Prioritised Urgent Investment Refurbishment
Lifecycle Replacement Schools Refurbishment
Principal Offices – Fabric and Service Investment  Refurbishment
Communities Facilities Fund Refurbishment
Civic Centre Fabric Upgrade Refurbishment
Central Energy Efficiency Fund  Refurbishment
Social Work Resources
Care Home Replacement – Blantyre  New Build
Community Alarms Infrastructure
Replacement SWIS Plus Infrastructure

Page 12

No embedded text on this page.

Page 13

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2021/2022 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
♦ update members of the Financial Resources Scrutiny Forum on the final outturn
position of the Council’s Housing Capital Programme for the period covering 1 April
2021 to 31 March 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the final outturn position on the 2021/2022 Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 31 March 2022 from a
financial perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, which was
reported to the Executive Committee on 29 June 2022.  Any physical progress update
for projects carried forward into financial year 2022/2023 will be picked up as part of the
new year monitoring report. 
4. Housing Capital Programme Final Outturn Position 2021/2022 
4.1. The revised Housing Capital Programme for 2021/2022 totalled £79.640 million. This
revised programme was approved by Executive Committee on 22 September 2021.   
4.2. Appendix A shows actual expenditure of £73.181 million which is £6.459 million less than
the budget of £79.640 million.  The delivery of the Housing Capital Programme for
2021/2022 has been affected by the pandemic. Part of this underspend relates to the
New Housing Supply Programme, and this was solely due to the volume of buy backs,
which was lower than targeted levels due to current market conditions. The remainder of
the underspend relates to our ongoing investment in stock, which has been affected by
the Covid-19 restrictions. 
. 
4.3. Housing and Technical Resources have also received additional one-off income totalling
£6.166 million in relation to Renewable Heating Initiative / Feed in Tariffs, land sales,
developer contributions and Scottish Government Grants. This will be added to the overall
funding available for the Housing Programme. 
5

Page 14

4.4. Taking into account the year-end underspend position of £6.459 million (section 4.2) and
the additional income of £6.166 million (section 4.3), means a carry forward of £12.625
million. Further analysis of this budget confirmed that £6.820 million is required in
2022/2023, with the remainder being carried forward into future years. 
4.5. The budgeted programme for 2022/2023 is £52.230 million.  In addition to the carry
forward of £6.820 million noted at section 4.4, the Capital Programme for 2022/2023
has been increased by a further £7.311 million to reflect additional expenditure on new
build homes at East Whitlawburn.  This results in a revised budget for the year of
£66.361 million and this is discussed further in the new year monitoring report.   
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications 
6.1. The financial implications are included in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an 
overspend.  The risk has been assessed as low given the detailed project management
plans prepared and monitored for each project.  The risk of overspend is managed
through four weekly Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 August 2022 
Link(s) to Council Values/Ambitions/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 22 September 2021
 Executive Committee, 29 June 2022 
List of Background Papers 
 Capital Ledger prints to 31 March 2022

Page 15

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail:  jackie.taylor@southlanarkshire.gov.uk

Page 16

SOUTH LANARKSHIRE COUNCIL           Appendix A
CAPITAL EXPENDITURE 2021/22
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2021 TO 31 MARCH 2022 
2021/22
Annual
Budget  
2021/22
Actual to
31/03/22 
£m £m
EXPENDITURE  
2021/22 Budget 
including carry forward from 2020/21
79.640 73.181 
2021/22
Actual to
31/03/22  
£m
INCOME     
Land Sales  1.536
Capital Funded from Current Revenue  19.637
Prudential Borrowing  39.942
Scottish Government Specific Grant:
– New Council Houses   5.385
– Land Purchases  0.850
– Open Market Purchase Scheme  1.995
– Mortgage to Rent  0.056
Miscellaneous Income  3.780
TOTAL FUNDING  73.181

Page 17

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 21/22 0.000 7.483 13.924 20.360 26.079 31.798 37.517 43.236 48.955 54.674 60.393 66.112 71.831 94.360
Revised Budget 21/22 0.000 7.483 13.924 20.360 26.079 31.798 37.517 43.236 47.255 52.174 57.893 63.612 69.331 79.640
Actual 21/22 0.000 7.483 13.924 20.360 26.065 31.657 37.431 43.012 47.032 51.845 55.689 60.374 60.374 73.181
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
£ Millions
HRA Capital Expenditure Profile Graph 21/22

Page 18

No embedded text on this page.

Page 19

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2022/2023 - General Fund
Capital Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
♦ update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2022
to 15 July 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the 2022/2023 General Fund
Capital Programme be noted. 
[1recs]
3. Background
3.1. South Lanarkshire Council (23 February 2022) approved a General Services budget
of £82.284 million for financial year 2022/2023.  Since the approval of this programme,
the financial year end and additional funding received will mean an adjustment to the
2022/23 Capital Programme set. This is detailed in section 4.1. 
3.2. The Capital reports attached provide detail on the position as at 15 July 2022 from
both a financial and physical perspective.   
3.3. Appendices A to E show the financial position of the General Fund Capital
Programme, with the physical progress detailed in Appendices F to H – as they are
split into Build, Non Build and Roads. 
4. General Fund Capital Programme 2022/2023
4.1. 2022/23 Budget:  Section 3.1 notes that the programme for the General Fund was
£82.284 million, as approved by Council in February 2022.  A number of adjustments
to the programme have been required to reflect budget carried forward from financial
year 2021/2022, additional funding received in 2021/2022 and projects transferred
to/from revenue.  In addition, the budget has been reflected to incorporate projects
which have had separate approval.  These adjustments total an increase of £12.948
million and result in a base budget for 2022/2023 of £95.232 million.  A full list of
these adjustments is included in Appendix A.     
6

Page 20

4.2.  During financial year 2022/2023, Resources have advised of adjustments required to
the programme.  The revised programme for the year totals £98.093 million and
includes adjustments to the programme totalling a net decrease of £2.861 million. 
These adjustments were approved by the Executive Committee on 29 June 2022
and 24 August 2022 and are detailed in Appendices B and C respectively.  The
adjustments include additional funding of £6.452 million which have been awarded to
the Council.  In addition, Social Work Resources have also proposed profiling
adjustments of £3.570 million to reflect the timing of spend on the Community Alarm
project (£2.070m) and the SWIS Plus project (£1.500m).   
4.3. The funding available to support the programme also totals £98.093 million and is
detailed in Appendix D (Page 3).   
4.4. Period 4 Position:  The programme spend and funding for the General Fund is
summarised in Appendix D.  As noted in 4.2, the total capital spending programme
for the year is £98.093 million. 
4.5. Budget for the period is £8.096 million and spend to the 15 July 2022 is £8.176
million.   
4.6. Actual funding received to 15 July 2022 is £71.677 million. 
4.7. Relevant officers will continue to closely monitor the generation of all income
including receipts. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are included in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend. 
There are detailed project management plans prepared and the risk of overspend on
each project is monitored through four weekly investment management meetings. 
8.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact the supply chain for the foreseeable future.  The impact of this will continue to
be monitored through the four weekly investment management meetings.  Further
updates will be reported in the coming months with any significant increases in
contract values being brought to members’ attention.   
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report.

Page 21

Paul Manning
Executive Director (Finance and Corporate Resources) 
16 August 2022 
Link(s) to Council Values/Ambitions/Objectives
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council, 23 February 2022 
 Executive Committee, 29 June 2022
 Executive Committee, 24 August 2022 
List of Background Papers
 Capital Ledger prints to 15 July 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail:  jackie.taylor@southlanarkshire.gov.uk

Page 22

APPENDIX A
(Page 1) 
2022/2023 General Services Base Budget Position – Required Adjustments 
General Fund – 2022/23 Budget:  Section 3.1 notes that the base programme for the General Fund 
is £82.284 million, as approved by Council in February 2022.  This has been updated to reflect the 
adjustments detailed below. 
1.1. 2021/22 Carry Forward:  As reported in the Final Outturn Report for 2021/2022, a separate
report to this Forum, a carry forward total of £11.145 million will ensure sufficient budget is
available to conclude ongoing projects within the General Fund Capital Programme. 
1.2. Additional Funding (2021/2022):  At the end of 2021/2022, additional funding was received
and used to fund expenditure incurred in that year. This includes additional developer
contributions for projects, funding for contractor claims and revenue funding for projects.   The
net total of this is an increase to the programme of £0.772 million and this needs to be added
to the overall expenditure budget being carried into 2022/2023.   
1.3. Transfers to/from Revenue:  The original budget for 2022/23 included an allocation of £1.000
million for Private Housing Scheme of Assistance and £4.8 million for Planned Asset
Management.  Following a review of these programmes of works, it has been identified that
some of the expenditure cannot be classed as Capital.  Therefore, budget of £4.000m will be
transferred to Housing and Technical Resource’s Revenue budget and details of these are
included in the bullets below.   
• Planned Asset Management (£3.000m of the £4.8 million)
• Private Housing Scheme of Assistance project (the total of £1.000m) 
1.4. The total overall budget for Planned Asset Management, across capital and revenue, remains
at £4.8 million.  While current estimates show that £3.000 million of the Planned Asset
Management requires to be classified as Revenue, the remaining spend across the year will
be reviewed to ensure it is classed appropriately (as Revenue or Capital), and any further
movement reported to a future meeting.   
1.5. Conversely, expenditure in relation to investment in roads carriageways is currently funded
through the Roads Services Revenue budget but should be categorised as capital spend.  It is
proposed that budget totalling £1.531million be transferred to the 2022/2023 Capital
Programme.  As with Planned Maintenance, the total overall budget for carriageways across
capital and revenue remains unchanged. 
1.6. The result of the adjustments noted at sections 1.3 to 1.5 is a net transfer to Revenue of £2.469
million.  Capital expenditure can be funded by Revenue monies, however, Revenue spend
cannot be paid for from Capital funding.  The Council’s Capital programme includes funding
that can be used for revenue spend, such as contributions from the Revenue budget.  We are,
therefore, able to move funding between the Capital and Revenue Programmes and deliver all
the projects as planned.  This is an accounting transaction only. 
1.7. Footpaths and Roads Improvement Fund:  As part of the 2022/2023 Revenue Budget,
members approved investment in a Footpaths and Roads Improvement Fund totalling £2.500
million.  This needs to be added to the Capital Programme.

Page 23

APPENDIX A
(Page 2) 
1.8. Clyde Bridge Replacement:  The capital cost of replacing Clyde Bridge is estimated at £7.250
million.  The Council has already provided funding of £3.500 million for this project and a 
Section 36c report approved the balance of £3.750 million, of which £2.491 million is already
included within the approved 2022/2023 Capital Programme.  Of the remaining funding of
£1.259 million, £1.000 million is income from a developer in relation to works delivered and
funded by the Council in 2019. This £1.000 million will be added to the 2022/2023 Capital
Programme.  The balance of £0.259 million (if required) will be met from the Roads
Carriageways and Associated Infrastructure Capital allocation into 2023/2024. 
2022/2023 General Services Base Budget Position:  Taking into account the movements noted in
1.1 to 1.8, the General Services Programme for 2022/2023 is now £95.232 million.  This is the base
budget for the financial year.  This is summarised in Table 1 below.     
Table 1 – 2022/2023 General Services Base Budget 
2022/23
£m
Approved Programme – 23 February 2022 (Section 3.1) 82.284  
2021/22 Carry Forward (Section 1.1) 11.145
2021/2022 Additional Funding Received (Section 1.2) 0.772
Transfers to Revenue (Section 1.3 – 1.4) (4.000)
Transfers from Revenue (Section 1.5) 1.531
Footpaths and Roads Improvement Fund (Section 1.7) 2.500
Standing Order Section 36c – Approved March 2022 
- Clyde Bridge Replacement (Section 1.8)
1.000  
2022/2023 General Services Base Budget  95.232

Page 24

APPENDIX B
(Page 1) 
Adjustments Approved by Executive Committee – 29 June 2022 
Community and Enterprise Resources 
Renewal of Play Parks
As reported to Executive Committee (September 2021), the Scottish Government
have allocated £60 million of capital funding to Local Authorities to renew play parks
across Scotland.  The second £5 million has been allocated in 2022/2023 and South
Lanarkshire’ share of this is £0.296 million, which will be distributed via the General
Capital Grant.  Distribution of the remaining £50 million funding in future years has still
to be confirmed.   
Approval is sought to increase the 2022/2023 Capital Programme by £0.296 million,
reflecting South Lanarkshire’s in-year allocation.  A report will be presented to the
Community and Enterprise Resources Committee in October 2022 providing an
update on how this funding could be allocated to projects. 
£0.296m
Nature Restoration Fund
Scottish Government have confirmed the next phase of Nature Restoration Fund
(NRF) capital funding of £5 million to be spent in 2022/2023 to support new, or to
enhance existing, approaches to restoring biodiversity across Scotland.  South
Lanarkshire have been allocated £0.188 million in 2022/2023, which will be distributed
via the General Capital Grant.   
Approval is sought to increase the 2022/2023 Capital Programme by £0.188 million
and officers are currently working to identify proposals for projects which could be
delivered in-year.       
£0.188m 
Springhall Cage – Additional Play Equipment 
Approval is sought to increase the 2022/23 Capital Programme by £0.020 million for
the addition of a new piece of play equipment at the Springhall Cage play area.  This
will be funded by a contribution from the Big Lottery Fund.   
£0.020m 
Coronation Crescent – Play Equipment
Approval is sought to increase the 2022/23 Capital Programme by £0.010 million to
allow the addition of new play equipment and safer surfacing.  The project will be
funded by a contribution from the Strutherill and Birkenshaw Our Place Our Plan
Community Group. 
£0.010m
Place Based Investment Programme
Funding from the Scottish Government of £1.740m has been confirmed for the next
phase of the Place Based Investment Programme.  In line with previous years the
funds are open to communities to bid for grants to support projects.   
Approval is sought to increase the 2022/2023 Capital Programme by £1.740 million. 
The allocation of this funding to specific projects will be undertaken by the Executive
Director of Community and Enterprise, through delegated authority as approved by
the Community and Enterprise Resources Committee in December 2021.  An update
will be presented in a separate report to the next Community and Enterprise
Resources Committee in August 2022.   
£1.740m

Page 25

APPENDIX B
(Page 2) 
Hamilton HUB
Approval is sought to increase the 2022/23 Capital Programme by £0.300m to reflect
an additional award received from the Scottish Government’s Regeneration Capital
Grant Fund towards the new Hamilton Hub project at the New Cross Centre in
Hamilton.  This will augment the original allocation from the Regeneration Capital
Grant Fund (£0.720m) and contributions from the Town Centre Regeneration Fund
(£0.250m) and Place Based Investment Fund (£0.300m) which were added to the
Capital Programme previously and results in total investment of £1.570 million.   
£0.300m
Strathclyde Partnership for Transport (SPT)
Strathclyde Partnership for Transport have awarded this Council £1.695 million to
progress a number of schemes during 2022/2023:    
Bus Infrastructure Improvements £0.158m
National Strategic Cycle Routes £0.400m
Route Action Plans £0.200m
Bus Route Congestion Reduction Measures £0.415m
Hairmyres Station Park and Ride £0.081m
Lanark Interchange £0.441m
Total     £1.695m                                                                                               
The above allocations are net of funding of £0.080 million carried forward from
2021/2022.  Approval is sought to increase the 2022/2023 Capital Programme by
£1.695 million. 
£1.695m
Electric Vehicle Charging Infrastructure
Funding has been made available to develop a public electric vehicle charging
network. Approval is sought to increase the 2022/23 Capital Programme by £0.060
million which will be funded by a contribution from Transport Scotland.  This will fund
the development of a Public Electric Vehicle Charging Strategy and Infrastructure
Expansion Plan. 
£0.060m
Cycling Walking and Safer Routes
The Council’s Cycling, Walking and Safer Routes grant allocation from the Scottish
Government for 2022/2023 has now been confirmed as £2.054 million.  This is an
increase of £0.650 million from the funding advised previously and included in the
2022/2023 Capital Programme (£1.404m - approved 23 February 2022).  This will be
used to deliver road safety and infrastructure improvement schemes including road
safety schemes at schools, route action plans and new walking & cycling facilities
infrastructure. 
Local Authority Direct Resource Grant
The Scottish Government have provided specific grant funding to help local
authorities address some of the delivery challenges associated with active travel
schemes, to help evidence the value of active travel schemes locally and show
progress in increasing active travel nationally. Approval is sought to increase the
2022/2023 Capital Programme by a further £0.083 million.   
This funding will be used to develop Active Travel Plans (ATP) within the
Lesmahagow/Kirkmuirhill Area, Biggar/Symington Area, Forth/Carnwath Area and
Douglas/Abington/Crawford Area.  These ATP’s will complement existing ATP’s. 
£0.650m 
£0.083m

Page 26

APPENDIX B
(Page 3)
Education Resources 
Education ASN Adaptations / Mainstream Growth
Education Resources have identified a number of essential adaptations totalling
£0.500 million, which will provide additional accommodation for ASN pupils and to
accommodate for mainstream pupil growth.  These works are considered necessary
in advance of the new session commencing in August 2022 and will be funded from
Reserves.   
£0.500m
Castlefield Primary School – Extension
The 2022/23 capital programme includes an allocation of £0.250 million to allow a
two-classroom extension to Castlefield Primary School to commence on site early in
2023.  
Approval is sought to increase the 2022/23 Capital Programme by a further £0.750m
to allow the project to commence on site earlier than previously anticipated, during
Summer 2022.  The project will be funded from developer’s contributions. 
£0.750m
Larkhall Academy – Adaptations
There is currently an allocation of £0.300m included within the 2022/2023 Capital
Programme to undertake adaptations to Larkhall Academy to increase capacity of the
ASN Base.  The project was delayed from financial year 2021/22 due to the impact of
Covid-19 on the provision of materials. The project has now been re-tendered at a
revised cost of £0.340 million. 
It is proposed that the 2022/2023 Capital Programme be increased by a further
£0.040 million to allow this project to be undertaken during Summer 2022.  This
increase will be funded by developers’ contributions from the Larkhall Community
Growth Area. 
£0.040m
Social Work Resources 
Community Alarms Replacement
The Scottish Government have awarded grant funding of £0.080 million towards the
costs of service development for the transition of Telecare Services from analogue to
digital.  £0.040 million of this funding was received and utilised in financial year
2021/2022.  Approval is sought to increase the 2022/2023 Capital Programme by
£0.040 million to reflect the remaining funding received.   
In addition to the above, the 2022/23 Capital Programme includes an allocation of
£2.741 million to progress the replacement of Community Alarms.  The first batch of
alarms are being purchased now, with further roll out into 2023/24.  Approval is
sought to allow slippage of £2.070 million into the 2023/24 Capital Programme, based
on the timing of costs now that the project team are in place. 
£0.040m 
(£2.070m) 
Minor Adjustments -  
TOTAL ADJUSTMENTS £4.302m

Page 27

APPENDIX C 
Adjustments Approved by Executive Committee – 24 August 2022 
Community and Enterprise Resources 
Country Parks - Horseshoe Bridge, Calderglen 
The project to replace the Horseshoe Bridge at Calderglen Country Park was
scheduled to be undertaken during the summer months. However, due to
contractual issues it is now planned to commence this project in early Spring 2023.  
Approval is sought to slip £0.174m into financial year 2023/24.   
(£0.174m)  
Education Resources 
Kirklandpark Primary School - Adaptations
Approval is sought to increase the 2022/23 Capital Programme to reflect £0.040m
of Developer Contributions already received from the development at Lethame
Road, Strathaven.  This funding will be utilised to convert general purpose space
into a permanent classroom at Kirklandpark Primary School, Strathaven.   
In order to reflect the anticipated timescales for this project, £0.005m will be
required to undertake design works in 2022/2023 with the balance of £0.035m
required in 2023/2024 to carry out the works during the 2023 Easter school
holidays.   
£0.040m 
(£0.035m)
Housing and Technical Resources 
Prioritised Urgent Investment - Roberton Hall
Approval is sought to increase the 2022/23 Capital Programme by £0.188m
reflecting additional contributions from Clyde Windfarm (£0.094m) and the
Renewable Energy Fund (£0.094m) towards the cost of the essential works
undertaken at Roberton Hall.   
£0.188m  
Social Work Resources 
Replacement Care Facility – Blantyre
Approval is sought to increase the 2022/2023 Capital Programme to reflect a
£0.040m contribution from NHS Lanarkshire towards the cost of the rehabilitation
gym within the new care facility at Blantyre.   
£0.040m
SWIS Plus Replacement 
Approval is sought to slip £1.500m into the 2023/2024 Capital Programme to reflect
the revised completion schedule for the new SWIS Plus Replacement system.  This
project is slightly behind schedule, whilst the final details of the contract are being
negotiated.  The revised timescales reflect the contract commencing on 1 August
2022, instead of 1 July 2022, with an 18-month implementation period reflected in
the profile of payments to the contractor.     
(£1.500m)  
TOTAL ADJUSTMENTS (£1.441m)

Page 28

APPENDIX D
(Page 1)
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2022/23       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 15 JULY 2022 
£m  
Total Base Budget (including carry forward from 2021/2022) 95.232  
Adjustments – Executive Committee 29 July 2022 (Appendix A) 4.302  
Adjustments – Executive Committee, 24 August 2022 (Appendix C) (1.441)  
Total Revised Budget 98.093   
2022/23
Budget 
Period 2
Proposed
Adjustments 
Period 4
Proposed
Adjustments 
Revised
2022/23
Budget
Resource £m £m £m £m     
Community & Enterprise 59.381 5.042 (0.174) 64.249
Education 14.838 1.290 0.005 16.133
Finance & Corporate 3.695 - - 3.695
Housing & Technical 8.125 - 0.188 8.313
Social Work 7.393 (2.030) (1.460) 3.903
Other Match Funding 1.800 - - 1.800     
TOTAL CAPITAL
PROGRAMME
95.232 4.302 (1.441) 98.093

Page 29

APPENDIX D
(Page 2)
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2022/23       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 15 JULY 2022 
Resource Name 
Annual
Budget
£000 
2021/22
C/F
£000
Previous
Slippage
/Adjs
£000
Total
Original
Budget
£000 
Proposed
Adjs
£000 
Proposed
Slippage
£000 
Total
Budget
£000 
Estimate
to Date
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
8,101 726 14 8,841 514 (174) 9,181 183 211
Planning & Reg  0 0 0 0 0 0 0 0 0
Enterprise &  
Sustainable Dev
17,149 3,179 215 20,543 2,040 0 22,583 818 819
Roads, Transport
& Fleet
21,651 3,252 5,094 29,997 2,488 0 32,485 1,916 2,043 
Resource Total 46,901 7,157 5,323 59,381 5,042 (174) 64,249 2,917 3,073          
Education
Growth  /
Accommodation
Pressures
7,043 715 94 7,852 1,330 (35) 9,147 2,267 2,253
1,140 Hours 3,145 378 248 3,771 0 0 3,771 66 50
ICT Developments 3,180 31 - 3,211 0 0 3,211 333 303
Other - (3) 7 4 0 0 4 0 0 
Resource Total 13,368 1,121 349 14,838 1,330 (35) 16,133 2,666 2,606          
Finance & Corporate
IT Services 2,444 1,251 - 3,695 0 0 3,695 268 270 
Resource Total 2,444 1,251 - 3,695 0 0 3,695 268 270          
Housing and Technical
Office Accom 9,748 949 (2,939) 7,758 188 0 7,946 552 431
Private Housing
Scheme of
Assistance
1,000 0 (1,000) 0 0 0 0 0 0
Other Housing 0 367  367 0 0 367 13 3 
Resource Total 10,748 1,316 (3,939) 8,125 188 0 8,313 565 434 
Social Work
Care Facilities 2,571 131 0 2,702 40 0 2,742 1,560 1,721
Other 4,452 169 70 4,691 40 (3,570) 1,161 120 72 
Resource Total 7,023 300 70 7,393 80 (3,570) 3,903 1,680 1,793          
Other Match
Funding
1,800 - - 1,800 - - 1,800 - - 
Overall Total 82,284 11,145 1,803 95,232 6,640 (3,779) 98,093 8,096 8,176

Page 30

APPENDIX D
(Page 3)
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2022/23       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 15 JULY 2022 
2022/23
Original
Budget
2022/23
Revised
Budget
2022/23
Budget to
15/07/22
2022/23
Actual to
15/07/22 
£m £m £m £m
Expenditure         
General Fund Programme 95.232 98.093 8.096 8.176 
Income
2022/23
Original
Budget
2022/23
Revised
Budget 
2022/23
Actual
To
15/07/22         
£m         £m  £m     
Prudential Borrowing 55.416 51.335  51.335
Developers Contributions 6.552 7.347  5.696
Partners (Including High Blantyre
Construction, SPT, Sustrans, and
CARES)
1.745 3.758  1.414
Scottish Government:     
- Capital Grant 22.424 22.908  5.680 
- Cycling, Walking and Safer Routes 2.154 2.887  0.000 
- Vacant and Derelict Land 1.820 1.820  0.969 
- Regeneration Capital Grant  1.720 2.020  0.807 
- Town Centre Regeneration Fund 0.101 0.101  0.101 
- Place Based Investment Programme 1.617 3.357  3.357 
- Electric Vehicle Charging Infrastructure 0.118 0.118  0.089 
- NSS Tec 0.000 0.040  0.040
Glasgow City Region City Deal 0.000 0.000  0.000
Capital Receipts 1.000 1.000  0.787
Specific Reserves 0.534 1.034  1.034
Revenue Contribution 0.031 0.368  0.368     
TOTAL FUNDING 95.232 98.093  71.677

Page 31

Appendix E
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2022/23 
BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 15 JULY 2022 (PERIOD 4)                 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status               
Projects Complete  - 1 3 4          
Projects on Programme  - 108 110 114          
Projects Behind
Programme 
- - 1 -          
Projects Altered Brief/
Programme 
- - - 2          
Projects Still to
Commence 
- 25 23 23           
- 134 137 143                         
Project Status               
Design Feasibility  - 61 63 67          
Sketch Design  - 3 1 1          
Detailed Design  - 2 2 1          
Production Information  - 6 5 4          
Tendering  - 22 21 25          
On Site  - 39 42 41          
Complete  - 1 3 4           
- 134 137 143

Page 32

Appendix F
(Page 1) 
GENERAL FUND CAPITAL PROGRAMME 2022/23                     
NON BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 15 JULY 2022 (PERIOD 4) 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Number of Projects           
Carried Forward 21/22
Programme - 38 38 38                         
Approved from 22/23
Programme - 9 9 9                         
Total Projects Currently
Reported - 47 47 47                         
Number of Projects                           
Projects Completed - - - -                         
Projects Ahead of
Programme - - - -                         
Projects on Programme - 47 47 47                         
Projects Behind
Programme - - - -         
Projects, Altered
Brief/Programme - - - -                         
Projects On Hold  - - - -                         
- 47 47 47           
Appendix F
(Page 2)

Page 33

General Fund Capital Programme 2022/23
Non-Build Executive Summary – Project Status
Type  Status
New Library IT Infrastructure Upgrade Costs On Programme
C/F Extension of Cemeteries – Douglas Cemetery On Programme
C/F Zero Waste Fund On Programme
C/F Fallside Park Play Area, Bothwell On Programme
C/F Forth Play Area On Programme
C/F Hairmyres Play Area On Programme
New Coronation Crescent - Play Equipment On Programme
New Nature Restoration Fund On Programme
C/F Renewal of Play Parks On Programme
C/F Alexander Hamilton Memorial Park – Woodland Management On Programme
C/F Willie Waddell Sport and Community Centre, Forth – Monoliths  On Programme
C/F Allotments On Programme
C/F Bin Storage Areas On Programme
C/F Bothwell Road Park – Sensory Garden On Programme
New Springahll Urban Greenspace Development – Additional Equipment On Programme
New Memorial Headstone Remedial Works On Programme
New Ash Die Back On Programme
C/F Langlands Boardwalk On Programme
C/F Hamilton Palace Grounds Play Area On Programme
New Synthetic and Grass Pitch Replacement – Hamilton Palace Grounds On Programme
C/F Allotment & Raised Beds, Strathaven On Programme
C/F Upgrades to Community Infrastructure On Programme
C/F Greenhall Replacement Bridge On Programme
C/F White Bridge Replacement, Chatelherault Country Park On Programme
C/F Hamilton Mausoleum On Programme
C/F City Deal – Community Growth Areas On Programme
C/F Vacant and Derelict Land – Cunningar Allotments On Programme
C/F Vacant and Derelict Land – Clyde Gateway - Cunningar On Programme
C/F Abington Campus for Enterprise On Programme
C/F Rural Development Centre On Programme
C/F   Town Centre Regeneration Fund On Programme
C/F Hamilton HUB – New Cross Shopping Centre On Programme
New Place Based Investment Programme – 2022/2023 On Programme
C/F Place Based Investment Programme – 2021/2022 On Programme
C/F Education Information Communication Technology Solutions for Learning On Programme
C/F Wide Area Network Capitalisation On Programme
C/F Information Technology Infrastructure Refresh On Programme
C/F Oracle Upgrade On Programme
C/F Digital Tools On Programme
C/F Digital Connectivity On Programme
C/F Electronic Document Records Management System On Programme
C/F Computer Room Upgrades On Programme
C/F Digital Transformation Fund On Programme
New Digital Transformation Review Fund On Programme
C/F Audio Visual Upgrade – Council Chambers On Programme
C/F Community Alarms On Programme
C/F Swiss Plus On Programme

Page 34

Appendix G 
GENERAL FUND CAPITAL PROGRAMME 2022/23 
ROADS EXECUTIVE SUMMARY 
PERIOD ENDED 15 JULY 2022 (PERIOD 4)                             
1 2 3 4 5 6 7 8 9 10 11 12 13              
Number of Projects             
Total Projects Currently Reported - 142 145 192         
Programme Status             
Projects Complete - 17 26 30         
Projects on Programme - 125 119 162         
Projects Behind Programme - - - -         
Projects, Altered Brief / Programme - - - -         
Projects Still to Commence - - - -         
- 142 145 192         
Project Status             
Briefing - 18 17 62         
Production Information - 91 92 88         
Billing - - - -         
Tendering - 1 3 3         
On Site - 14 7 9         
Complete - 17 26 30         
- 141 145 192

Page 35

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2022/23
PROJECT / PROGRAMME STATUS - PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Still to
Com
m
ence
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Nutberry Place, Strathaven 1 1
Moss Road, Strathaven 1 1
Markethill Road , East Kilbride 1 1
Cairnmuir Road, East Kilbride 1 1
Carron Place, East Kilbride 1 1
St Leonards Road, East Kilbride 1 1
Carnegie Hill and Mungo Park, East Kilbride 1 1
Bank Park, East Kilbride 1 1
A726 Strathaven Road , East Kilbride 1 1
Meadowhead Highway, Auldhouse 1 1
Teal Crescent, East Kilbride 1 1
Whinfell Drive, East Kilbride 1 1
Turnberry Place, East Kilbride 1 1
Ardochrig Highway, Auldhouse 1 1
Rokeby Crescent, Strathaven 1 1
Heathery Knowe and Strathcona Lane, East Kilbride 1 1
Owen Park, East Kilbride 1 1
Darwin Road, East Kilbride 1 1
Firlee and Northfield, East Kilbride 1 1
Wellesley Crescent and Drive, East Kilbride 1 1
Kirktonholme Road and Flakefield Place 1 1
Torrance Road, East Kilbride 1 1
Harrington Road/Cunninghame Road,  East Kilbride 1 1
Blacklands Road, East Kilbride 1 1
Edmund Kean, East Kilbride 1 1
Glen Dye, East Kilbride 1 1
Glen Bervie, East Kilbride 1 1
Glen Eagles, East Kilbride 1 1
Blacklaw Drive, East Kilbride 1 1
Loch Loyal, East Kilbride 1 1
Kirkoswald, East Kilbride 1 1
Alloway Road and Ellisland, East Kilbride 1 1
Victoria Street,Rutherglen 1 1
A730 Glasgow Road, Rutherglen 1 1
Gilbertfield Road, Cambuslang 1 1
Kingsacre Road, Rutherglen 1 1
Richmond Drive, Rutherglen 1 1
Mill Road, Cambuslang 1 1
Seath Road, Rutherglen 1 1
Preventative Maintenance Schemes 
Surface Dressing prep patching ~ various locations 1 1
Strategic Patching
Strategic /machine patching works ~ various locations  1 1
Footways
A71 Darvel Road, Strathaven                                  1 1
Carnegie Hill, East Kilbride                                                      1 1
Mungo Park, East Kilbride                                          1 1
Glen Morriston, East Kilbride                                               1 1
Bank Park, East Kilbride                                                            1 1
A749 East Kilbride Road, Rutherglen 1 1
Castlefern Road, Rutherglen                                           1 1
Hamilton Area
Strategic Schemes 
B756, Bellshill Road, Uddingston 1 1
Clyde Avenue, Bothwell 1 1
Selkirk Street / Jedburgh Street, Blantyre 1 1
A723, Hamilton Roundabout, Hamilton 1 1
Hillhouse Road, Hamilton 1 1
Hope Street, Hamilton 1 1
Farm Road, Hamilton 1 1
B7071, Leechlee Road, Hamilton 1 1
Corrie Court, Hamilton 1 1
A71, Strathaven Road, Stonehouse 1 1
Netherburn Road, Netherburn 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title

Page 36

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2022/23
PROJECT / PROGRAMME STATUS - PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Still to
Com
m
ence
PROJECT STATUS PROGRAMME STATUS
Project Title
Preventative Maintenance Schemes 
Surface Dressing prep patching ~ various locations 1 1
Strategic Patching
Pollock Avenue, Hamilton 1 1
Ayr Road, Stonehouse 1 1
Main Street, Blantyre 1 1
Wee Sunnyside Road, Quarter 1 1
Glebe Avenue, Bothwell 1 1
Clydeview, Bothwell 1 1
Kenshaw Place, Larkhall 1 1
Footways
Lime Grove, Blantyre 1 1
Larch Court, Blantyre 1 1
A723, Strathaven Road, Hamilton 1 1
Bardykes Road, Blantyre 1 1
Darngaber Gardens, Quarter 1 1
Glenburn Avenue, Stonehouse 1 1
Clydesdale Area
Strategic Schemes 
Hill brae 1 1
A70 Mainshill  1 1
A702 Elvanfoot Village 1 1
B7078 (Mid Rig to B740 Jct) 1 1
Low Village Rd, Lamington 1 1
Greenshields Rd, Biggar 1 1
C37 - Millhill to Auchengray level crossing 1 1
C37 - Westsidewood to Eastsidewood 1 1
A73 Carluke to Bogside R'about, Law 1 1
C11 Wellshields to Green Pastures 1 1
B740 Andershaw Jct to Cjohn (inclSNar Jct) 1 1
C36 Anston/Dunsyre area 1 1
B7055, Burnhead to Little Gala 1 1
A706 Main Street, Forth 1 1
Vere Road, Kirkmuirhill 1 1
Byretown Road, Kirkfieldbank - 1 1
Cumberhead Road, Coalburn - 1 1
Dale street 1 1
Brownhill Ave, Douglas 1 1
Allison St, Carstairs Jct 1 1
King St, Carstairs Jct 1 1
Park Pl, Biggar 1 1
A73 Lanark Road, Carluke 1 1
B7016 Forth to Carnwath, Braehead 1 1
C1 Mauldslie Road, Carluke 1 1
Wheatlandside, Lanark 1 1
St Ninians, Lanark 1 1
Wilton Road, Carluke 1 1
Preventative Maintenance Schemes 
Surface Dressing prep patching ~ various locations 1 1
Strategic Patching
Gallowhill Road, Lanark 1 1
Coulterhaugh Road, Biggar 1 1
Nemphlar Moor Road/Nemphlar Road 1 1
Draffan Fence Road 1 1
Auchrobert Road 1 1
A70 Edinburgh Road 1 1
Carlisle Road, Draffan 1 1
Footways
A70 Mainshill  1 1
Low Village Rd, Lamington 1 1
A706 Main Street, Forth 1 1
Whitehill Crescent, Lanark 1 1
PARTICIPATORY BUDGET
East Kilbride/Cambuslang and Rutherglen Areas
Footways

Page 37

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2022/23
PROJECT / PROGRAMME STATUS - PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Still to
Com
m
ence
PROJECT STATUS PROGRAMME STATUS
Project Title
Gilderdale, East Kilbride                                                               1 1
Threshold, East Kilbride                                                              1 1
Glen Cannich, East Kilbride                                                             1 1
Newlands Rd, East Kilbride                                                             1 1
Wellesley Dr, East Kilbride                                                             1 1
Kype View, Strathaven                                                                 1 1
Douglas St, Strathaven                                                                  1 1
Applegarth Rd, Strathaven                                                           1 1
High Common Road, East Kilbride 1 1
Kirktonholme Rd, East Kilbride                                                     1 1
St Leonards Rd, East Kilbride                                                                       1 1
Newton Rd, Strathaven                                                               1 1
Colvilles Place, East Kilbride 1 1
Thomson Street, Strathaven 1 1
Lettrickhills Crescent , Cambuslang                   1 1
Cairns Road, Cambuslang                                                           1 1
Rosslyn Ave, Rutherglen                                                               1 1
Ryan Way, Rutherglen                                                                 1 1
Calderwood Rd, Rutherglen                                                        1 1
Woodlands Crescent, Cambuslang                                               1 1
Dukes Road (from A724 uphill), Cambuslang 1 1
Hamilton Road, Cambuslang                 1 1
Main Street, Rutherglen (streetscape repairs)      1 1
Hamilton Area
Footways
Willow Drive, Blantyre 1 1
Highfield Road, Larkhall 1 1
Sycamore Grove, Blantyre 1 1
Avonbrae Crescent, Hamilton 1 1
St. Ninians Place, Hamilton 1 1
Selkirk Street, Blantyre 1 1
Wilson Place, Stonehouse 1 1
St Laurence Avenue, Stonehouse 1 1
Sherry Drive, Hamilton 1 1
Bellshill Road (Service Road), Bothwell 1 1
Carlisle Road, Ferniegair 1 1
Main Street, Blantyre 1 1
Central Avenue, Blantyre 1 1
Clydesdale Area
Footways
Station Road, Law 1 1
Wilton Road, Carluke PH1 1 1
Silverdale Crescent. Lanark 1 1
Dale Street. Douglas 1 1
Brownhill Avenue, Douglas 1 1
Main Street, Forth 1 1
Heathfield Drive, Blackwood 1 1
Bloomgate, Lanark 1 1
A721 Chapel Street, Carluke 1 1
St Leonard Steet, Lanark 1 1
ROADS REFURBISHMENT BUDGET
Structures projects
Cleghorn Bridge 1 1
Mousemill Road Retaining Wall repair/replacement 1 1
Traffic Signals
Upgrading the lamps/controllers and associated equipment ~ various locations 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure ~ various locations 1 1
Bridges
Clyde Bridge ~ Bridge replacement project  1 1
Daer Bridge ~ Bridge refurbishment & strengthening 1 1
Scrogton Bridge ~ Bridge refurbishment 1 1
CYCLING, WALKING AND SAFER ROUTES
Casualty Reduction Measures/Route Action Plans
B7078 Carlisle Rd - Ext of existing cycle path, lining and signage 1 1
A70 Ayr Road, Douglas at Eggerton Bridge - New build outs, lining & signing 1 1

Page 38

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2022/23
PROJECT / PROGRAMME STATUS - PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Still to
Com
m
ence
PROJECT STATUS PROGRAMME STATUS
Project Title
A70 on approach to R/A at J12 off slip - HFS, bollards, lining & signing 1 1
Eng Measures at Schools / Road Safety / Speed Limit Initiatives
50 part-time 20mph school zones and 6 town centre areas with 20mph areas 1 1
Traffic Signals / Pedestrain Crossings
Hamilton, Bothwell to Uddingston and Rutherglen corridors ~ Upgrades 1 1
Vehicle Activated Sign Upgrade
Upgrades to various speed indicator display and part time 20mph signage 1 1
Cycle Schemes
Churchill Avenue – West Mains Road to Queensway 1 1
Cycle Shelters in Schools 1 1
SPT GRANT FUNDED PROJECTS
SPT ~ BUS INFRASTRUCTURE WORKS
Enhancing bus stop provision and facilities 1 1
SPT ~ PARK AND RIDE SCHEMES
Lanark Interchange 1 1
Hairmyres P&R 1 1
SPT ~ STRATEGIC CYCLE INFRASTRUCTURE
Carstairs and Carluke ~ Cycle  Route 1 1
Provision of new cycle shelters in various town centres 1 1
SPT ~ REGIONAL CONGESTION REDUCTION MEASURES
Hamilton, Bothwell to Uddingston and Rutherglen corridors ~ Upgrades 1 1
SPT ~ CASUALTY REDUCTION MEASURES
A72 ~ New signing and lining 1 1
A70 Ravenstruther ~ patching and refresh lining 1 1
A749 Glasgow Rd/East Kilbride Rd ~ signing and road markings 1 1
A721 Carnwath Rd, Kilncadzow ~ Refurb gateway signage and repeaters 1 1
A721 Carnwath Rd at Hole Farm ~ Refresh road markings and new signage 1 1
Whitelees Rd at A721 Carnwath Road ~ Refresh lining 1 1
LOCAL AUTHORITY DIRECT RESOURCE GRANT (ACTIVE TRAVEL)
Report our recommendations to make active travel a more viable option 1 1
ELECTRIC VEHICLE CHARGING INFRASTRUCTURE
Installation on-street charge point installations ~ Various Locations 1 1
Public electric vehicle strategy and infrastructure expansion plan 1 1
CITY DEAL PROJECTS
Cathkin ~ Loss of value and Noise Insulation Regulations surveys 1 1
Stewartfield Way 1 1
Greenhills/Strathaven Road 1 1
62 88 0 3 9 30 29 163 0 0 0

Page 39

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2022/2023 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
♦ update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April 2022 to 15 July
2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 15 July 2022 from both
a financial and physical perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B. 
4. 2022/2023 Housing Capital Programme 
4.1. 2022/2023 Budget 
A total Housing Capital Programme budget for 2022/23 was approved by Council in
February 2022.  This included funding carried forward from previous years and totalled
a programme of £52.230 million.   
4.2. The Final Outturn report for financial year 2021/2022 noted a carry forward of £11.434
million into future years. Further analysis of this budget confirmed that £6.820 million is
required in 2022/2023, with the remainder being carried forward into future years. 
4.3. In addition, the Executive Committee on 24 August 2022 agreed that the 2022/2023
Capital Programme be increased by a further £7.311 million to reflect the expenditure
on new build homes at East Whitlawburn, which are being built on behalf of West
Whitlawburn Housing Association. 
4.4. As a result of these adjustments noted at sections 4.2 and 4.3, the revised programme
for 2022/2023 is £66.361 million. Programmed funding for the year also totals £66.361
million. The budget, along with a detailed breakdown of the funding sources is included
in Appendix A to this report. 
7

Page 40

4.5. Period 4 Position  
Budget for the period is £11.339 million and spend to 15 July 2022 amounts to £11.339
million (as shown in Appendix A).   
4.6. As at 15 July 2022, £11.339 million of funding had been received. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications 
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  There
are detailed project management plans prepared and the risk of overspend on each
project is monitored through four weekly investment management meetings. 
8.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact the supply chain for the foreseeable future.  The impact of this will continue to be
monitored through the four weekly investment management meetings.  Further updates
will be reported in the coming months with any significant increases in contract values
being brought to members’ attention.   
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 August 2022 
Link(s) to Council Values/Ambitions/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Council, 23 February 2022
 Executive Committee, 29 June 2022
 Executive Committee, 24 August 2022 
List of Background Papers 
 Capital Ledger prints to 15 July 2022

Page 41

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail:  jackie.taylor@southlanarkshire.gov.uk

Page 42

Appendix A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2022/23
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 15 JULY 2022 
2022/23
Original
Budget
2022/23
Revised
Budget
2022/23
Budget to
15/07/22
2022/23 
Actual to
15/07/22 
£m £m £m £m
Expenditure 
2021/22 Budget 
Incl. adjustment from 2020/21 
52.230  66.361  11.339  11.339 
2022/23
Original
Budget
2022/23
Revised
Budget 
2022/23
Actual to
15/07/22 
£m £m  £m
INCOME    
Capital Receipts 0.000 7.311  0.000
Capital Receipts – Land Sales 0.000 0.000  0.007
Capital Funded from Current Revenue 26.050 26.050  11.332
Prudential Borrowing 22.018 26.462  0.000
Scottish Government Specific Grant:    
- New Build 2.242 4.048  0.000
- Open Market Purchase Scheme 1.800 2.370  0.000
- Mortgage to Rent 0.120 0.120  0.000 
52.230 66.361  11.339

Page 43

Appendix B
HOUSING CAPITAL PROGRAMME 2022/23
EXECUTIVE SUMMARY
PERIOD ENDED 15 JULY 2022
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Programme Status               
Projects Complete  - 2 6 9                         
Projects on Programme - 113 109 105                         
Projects Behind
Programme 
- 3 7 3                         
Projects Altered
Brief/Programme
- 4 4 6                         
Projects Still to
Commence 
- 30 33 36           
- 152 159 159                         
Project Status              
Design Feasibility  - 67 71 68                         
Sketch Design  - 1 1 1                         
Detailed Design  - 1 3 4                         
Production Information - 6 6 6                         
Tendering - 30 26 26                         
On Site  - 45 46 45                         
Complete - 2 6 9                         
- 152 159 159

Page 44

Housing Capital Programme 2022/23 
Build Variance Explanations 
Project Name Status Variance Explanation
Kirkconnell Drive Rutherglen
- External Fabric
Behind Programme This project is behind
programme as a result of
resourcing issues
experienced by the
contractor.   
Upgrade of Central Heating
Systems - Council Wide
Phase 3
Behind Programme This project is behind
programme as a result of
supply chain issues in
relation to boilers.     
Upgrade of Central Heating
Systems - Council Wide
Phase 4
Behind Programme This project is behind
programme as a result of
supply chain issues in
relation to boilers.

Page 45

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 22/23 0.000 3.289 6.942 11.339 15.390 19.441 23.492 27.543 31.594 35.645 39.696 43.747 47.798 66.361
Revised Budget 22/23 0.000 3.289 6.942 11.339 15.390 19.441 23.492 27.543 31.594 35.645 39.696 43.747 47.798 66.361
Actual 22/23 0.000 3.289 6.942 11.339 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
£ Millions
HRA Capital Expenditure Profile Graph 2022/23

Page 46

No embedded text on this page.

Page 47

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
i advise the Forum of the overall financial position of the Council’s General Fund
Revenue Account and Housing Revenue Account for the period 1 April 2021 to
31 March 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendation(s):-
[recs], for G
(1) that across Resources, Corporate Items and Council Tax, the Council is
showing a year end underspend of £6.109 million after proposed transfers to
reserves (section 4 and Appendix 1), be noted;
(2) that the probable outturn transfers approved by members has now been
revised to £55.062 million (previously (£49.636 million) (Appendix 3), be
noted;
(3) that the Resources requests for transfers to reserves to spend on
commitments against specific streams of funding during the final part of the
year totalling £4.902 million (Appendix 4), be approved; 
(4) that the overfunding position on the IJB contribution as detailed at section 4.5
be noted;
(5) that after using Scottish Government funding and reserves brought forward
from 2020/2021, the position on COVID expenditure is break-even (section
4.9) be noted;
(6) that the £6.109 million underspend after proposed transfers to reserves, be
allocated as detailed in section 4.12, resulting in a break-even position for the
Council, be approved; and
(7) that the break-even position on the Housing Revenue Account (section 5), be
noted. 
3. Background
3.1. This overview report will summarise the 2021/2022 Year-End position for the
Council’s General Fund Revenue Account and Housing Revenue Account.   
3.2. Section 4 provides details the final position for the financial year, as well as the
movement from the previously reported Probable Outturn position for the Council.
The Housing Revenue position is shown in Section 5. 
3.3. Appendix 1 to the report details the overall spend position for the current year.  This
position includes the cost of COVID as well as all proposed transfers to reserves: the
8

Page 48

transfers to Reserves approved at Probable (Executive Committee, February 2022)
are shown in Appendix 3 and those new proposed Transfers to Reserves requested
by Resources at Year-End are shown in Appendix 4. 
4. Summary of Previously Reported Probable Outturn
4.1. For reference, the Council’s overall probable outturn position for the year (including
COVID and approved Transfers to Reserves), was last reported to Committee as an
underspend of £4.794 million (Executive Committee, 2 March 2022).  This assumed
full funding of COVID expenditure and an underspend of £4.794 million on the
Council’s General Services.   
4.2. The Year-End position is an underspend of £6.109 million.  This is after proposed
transfers to reserves. This final position also includes COVID expenditure and
funding. This is shown in Table 1 along with the movement from Probable Outturn to
Year-End – an improvement of £1.315 million (from an underspend of £4.794 million
to an underspend of £6.109 million at financial Year-End).     
Table 1 – General Service Year-End 2021/2022 
(after Transfers to Reserves) 
Probable
Outturn 
£m
Year-End 
£m
Movement
from
Probable
to Outturn
£m
Resource Position (Appendix 2, section 1 to 7) (0.585) 0.122 0.707
Loan Charges (Appendix 2, section 8) - 0.049 0.049
Corporate Items (Appendix 2, sections 9 to 12) 2.471 2.880 0.409
Council Tax (Appendix 2, section 13) 2.908 3.058 0.150
General Services Underspend 2021/2022 4.794 6.109 1.315  
4.3. This report and appendices provide a detailed analysis of the Council’s financial
position at the end of the year.  Appendices 1 and 2 provide detail of the Year-End
position with a summary of the £6.109 million noted in sections 4.4 to 4.13.   
4.4. Resources: The underspend position of £0.122 million is after taking into account
the Transfers to Reserves agreed at the Probable Outturn as well as the additional
transfers being proposed by the Resources as part of the Year-End position. The
Transfers at Probable Outturn and Year-End are detailed in Appendices 3 and 4
respectively.  The Resources’ Transfers to Reserves agreed at Probable Outturn
were originally £8.420 million and are now £8.196 million being a reduction of £0.224
million.  This reflects the increase in spend achieved in year, and therefore a reduced
level of budget to transfer to reserves.   
4.5. The Resource position includes an underspend on Core funding from the Council to
the IJB, and it is proposed that this is dealt with as overfunding in year.  This is
permissible in the IJB financial regulations.  It is proposed to transfer to reserves the
over-provision of funding to the Integrated Joint Board of £2.051 million and that this
money will be held in reserves and utilised to manage pressures within Children and
Family Services.  The Year-End position also includes an amount of specific funding
received in relation to the IJB that will be retained in the Council’s Balance Sheet and
will be available for use by the IJB (£6.840 million) which includes funding from the
Scottish Government for Care at Home, Delayed Discharge and Mental health
capacity

Page 49

4.6. Loan Charges: There is an underspend of £0.049 million after the proposed
Transfers to Reserves approved at Year-End. This relates to additional interest
received during the year. 
4.7. Corporate Items: There is a net underspend of £2.880 million for Corporate Items
after known commitments, which includes the underspend in relation to pay award
reported at Probable Outturn. The improvement since the Probable Outturn is mainly
due to the bad debt provision for the year being lower than anticipated. 
4.8. Council Tax: The over recovery for the year is £3.058 million, representing an
improvement of £0.150 million since the Probable Outturn. The increase comprises a
reduction in the level of Council Tax Reduction Scheme expenditure. 
4.9. COVID Year-End: The Year-End position includes COVID expenditure which has
been funded by Scottish Government funding received and funding carried forward
in reserves from 2020/2021. It also includes the transfer to reserves of unspent
funding, resulting in a breakeven position.  The funding carried forward will be used
to manage the ongoing budget pressures resulting from COVID into 2022/2023. 
4.10. Transfers to Reserves:  The Year-End underspend of £6.109 million includes
Transfers to Reserves of £59.964 million.  This includes the Transfers to Reserves
approved as part of the Probable Outturn (£49.636 million) adjusted for movements
totalling £5.426 million to reflect the final position.  The revision to the Probable
Outturn Transfers are shown in Appendix 3 (giving a total of £55.062 million for
Probable Outturn Transfers). 
4.11. There are also additional Transfers to Reserves proposed at Year-End total £4.902
million.  This reflects the carry forward of funding in Reserves to allow committed
areas of spend to be incurred in 2022/2023.  Details of these additional proposed
transfers are detailed in Appendix 4.  This takes the total Transfers to Reserves at
Year-End to £59.964 million (being Probable Outturn Revised Transfers of £55.062
million and Year-End Transfers of £4.902 million).   
4.12. The final underspend of £6.109 million is now confirmed and it is proposed that this
is transferred to the Earmarked General Fund to be used in the 2023/2024 Revenue
Budget Strategy. 
4.13. If this proposal is agreed, then these monies will be Transferred to Reserves for use
in future years’ budget strategies, including 2023/2024, and will mean that the
Council will return a break-even position for financial year 2021/2022. 
5. Housing Revenue Account Position
5.1. As at 31 March 2022, the position on the Housing Revenue Account is a breakeven
position.  This is after a transfer to the HRA Reserve of £2.917 million, which is
£1.946 million higher than budgeted.   
5.2. The details of the variances across the Housing Revenue Account are shown in
Appendix 5 and in the main are the net of an underspend on Property Costs and an
under-recovery of Income. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed within this report.

Page 50

8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in
this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 August 2022 
Link(s) to Council Values/Priorities/Outcomes
i Accountable, Effective, Efficient and Transparent 
Previous References
i None 
List of Background Papers
i Financial ledger and budget monitoring results to 31 March 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637  (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk

Page 51

Appendix 1
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (including COVID and AFTER Transfers) 
Period Ended 31 March 2022 
Committee 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/22
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/22
After
Transfers
Variance 
Annual
Budget
To Actual
After
Transfers
Departments: £m
Col 1
£m
Col 2
£m
Col 3
£m
Col 4 
£m
Col 5
£m
Col 6
£m
Col 7
£m
Col 8
Community and Enterprise Resources 119.475 124.218 124.941 (5.466)  122.767 (3.292) 123.982 (4.507)
Facilities Streets, Waste and Grounds 70.587 70.349 70.727 (0.140)  70.026 0.561 70.849 (0.262)
Fleet, Environmental and Projects (0.462) 0.497 0.537 (0.999)  0.093 (0.555) 0.163 (0.625)
Leisure and Culture Services 20.155 20.122 20.122 0.033  20.115 0.040 20.115 0.040
Planning and Economic Development 2.229 1.555 1.860 0.369  0.947 1.282 1.269 0.960
Roads 22.070 23.400 23.400 (1.330)  23.513 (1.443) 23.513 (1.443)
COVID-19 4.896 8.295 8.295 (3.399)  8.073 (3.177) 8.073 (3.177)
Education Resources 376.791 371.524 378.819 (2.028)  370.610 6.181 378.493 (1.702)
Education Resources 365.619 358.413 365.638 (0.019)  357.754 7.865 365.637 (0.018)
COVID-19 11.172 13.111 13.181 (2.009)  12.856 (1.684) 12.856 (1.684)
Finance and Corporate Resources 43.738 52.345 52.458 (8.720)  51.094 (7.356) 51.967 (8.229)
Finance Services - Strategy 2.340 2.340 2.340 0.000  2.318 0.022 2.318 0.022
Finance Services - Transactions 18.133 17.999 17.999 0.134  17.897 0.236 17.897 0.236
Audit and Compliance Services 0.394 0.394 0.394 0.000  0.154 0.240 0.154 0.240
Information Technology Services 4.733 4.790 4.790 (0.057)  5.914 (1.181) 5.914 (1.181)
Communications and Strategy Services 2.547 2.682 2.682 (0.135)  2.760 (0.213) 2.760 (0.213)
Administration and Licensing Services 4.207 4.646 4.709 (0.502)  4.658 (0.451) 4.721 (0.514)
Personnel Services 11.384 10.870 10.920 0.464  9.184 2.200 9.994 1.390
COVID-19 0.000 8.624 8.624 (8.624)  8.209 (8.209) 8.209 (8.209)
Housing and Technical Resources 18.141 18.870 19.159 (1.018)  18.682 (0.541) 19.080 (0.939)
Housing Services 8.896 8.942 8.942 (0.046)  8.861 0.035 8.861 0.035
Property Services 8.822 8.487 8.776 0.046  8.459 0.363 8.857 (0.035)
COVID-19 0.423 1.441 1.441 (1.018)  1.362 (0.939) 1.362 (0.939)
Social Work Resources 186.372 189.519 189.519 (3.147)  187.288 (0.916) 189.339 (2.967)
Performance and Support Services 8.113 7.709 7.709 0.404  7.636 0.477 7.636 0.477
Children and Family 35.228 36.237 36.237 (1.009)  36.145 (0.917) 36.145 (0.917)
Adults and Older People 141.369 141.339 141.339 0.030  139.287 2.082 141.338 0.031
Justice and Substance Misuse 1.662 1.692 1.692 (0.030)  1.647 0.015 1.647 0.015
COVID-19 0.000 2.542 2.542 (2.542)  2.573 (2.573) 2.573 (2.573)
Joint Boards 2.314 2.314 2.314 0.000  2.313 0.001 2.313 0.001
Total Resources  746.831 758.790 767.210 (20.379)  752.754 (5.923) 765.174 (18.343) 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/22
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/22
After
Transfers
Variance 
Annual 
Budget
To Actual
After
Transfers 
£m £m £m £m  £m £m £m £m
Total Resources  746.831 758.790 767.210 (20.379)  752.754 (5.923) 765.174 (18.343)
CFCR 1.743 1.743 1.743 0.000  1.743 0.000 1.743 0.000
Loan Charges 34.343 32.976 34.343 0.000  32.922 1.421 34.294 0.049
Corporate Items 6.994 2.278 4.523 2.471  1.231 5.763 4.114 2.880
Corporate Items - COVID 42.321 3.916 22.527 19.794  0.000 42.321 23.856 18.465
Corporate Items - 22/23 Strategy 13.550 0.000 13.550 0.000  0.000 13.550 13.550 0.000
Corporate Items - 21/22 Investments 5.884 0.441 5.884 0.000  0.000 5.884 5.884 0.000
Total Expenditure 851.666 800.144 849.780 1.886  788.650 63.016 848.615 3.051          
Council Tax 161.805 164.521 164.521 2.716  164.397 2.592 164.397 2.592
Less: Council Tax Reduction Scheme (21.391) (21.199) (21.199) 0.192  (20.925) 0.466 (20.925) 0.466
Net Council Tax 140.414 143.322 143.322 2.908  143.472 3.058 143.472 3.058
General Revenue Grant 296.269 296.269 296.269 0.000  296.269 0.000 296.269 0.000
General Revenue Grant - COVID 31.582 31.582 31.582 0.000  31.582 0.000 31.582 0.000
Non-Domestic Rates 319.312 319.312 319.312 0.000  319.312 0.000 319.312 0.000
Transfer from Reserves 64.089 64.089 64.089 0.000  64.089 0.000 64.089 0.000
Total Income 851.666 854.574 854.574 2.908  854.724 3.058 854.724 3.058          
Net Expenditure / (Surplus) Before
Transfers to Reserves
0.000 (54.430) (4.794) 4.794  (66.074) 66.074 (6.109) 6.109 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/22
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/22
After
Transfers
Variance 
Annual 
Budget
To Actual
After
Transfers 
£m £m £m £m  £m £m £m £m
Net Expenditure / (Surplus) Before
Transfers to Reserves
0.000 (54.430) (54.430) 54.430  (66.074) 66.074 (66.074) 66.074
Transfers to Specific Reserves 0.000 0.000 0.862 (0.862)  0.000 0.000 2.305 (2.305)
(Surplus) After Transfers to Specific
Reserves
0.000 (54.430) (53.568) 53.568  (66.074) 66.074 (63.769) 63.769
Transfer to Earmarked General Fund 0.000 0.000 48.774 (47.774)  0.000 0.000 57.660 (57.660)
Surplus for Year Transferred to
Uncommitted General Fund
0.000 (54.430) (4.794) 4.794  (66.074) 66.074 (6.109) 6.109

Page 52

Appendix 2 
Detail of Year-End Position Across Resources and Centrally Held Budgets 
1. Movement from Last Reported Position:  The previously reported position for
General Services was an underspend of £4.794 million.  At financial Year-End, the
position is now an underspend of £6.109 million – an improvement of £1.315 million. 
This is made up of an improvement in Resources of £0.707 million, an improvement in
the Centrally Held budgets of Corporate Items and Loan Charges (£0.458 million) and
an increase in the over-recovery of Council Tax (£0.150 million).  Each of the individual
areas of the Council’s General Services budgets are detailed in the remainder of this
Appendix.   
2. Resources and Centrally Held Budgets:  Details of the Resource positions, including
any assumptions are detailed below.  These figures include the costs associated with
COVID and include Transfers to Reserves. 
3. Community and Enterprise Resources: The Year-End position after transfers to
reserves is an overspend of £4.507 million.  Removing the cost of COVID leaves an
underspend of £0.515 million. This is an improved position of £0.495 million on the
Resource’s probable outturn position.  This is mainly due to an over recovery of income
for Planning and Building Standards applications and an improved spend position within
the Fleet service.   
4. Education Resources: The Year-End position after transfers to reserves is an
overspend of £1.702 million.  Removing the cost of COVID leaves a breakeven position
which is comparable to the Resource’s Probable Outturn position. 
5. Finance and Corporate Resources: The Year-End position after transfers to reserves
is an overspend of £8.229 million.  Removing the cost of COVID leaves a breakeven
position which is in line with the reported Probable Outturn position.   
6. Housing and Technical Resources: The Year-End position after transfers to reserves
is an overspend of £0.939 million.  Removing the cost of COVID leaves a breakeven
position which is in line with the reported Probable Outturn position.   
7. Social Work Resources: The Year-End position is a net overspend of £2.967 million.
Removing the cost of COVID leaves an overspend of £0.394 million which is an
improved position of £0.211 million on the reported Probable Outturn overspend
position of £0.605 million. This position includes the transfer to reserves of an over-
provision of funding to the Integrated Joint Board.  This money will be held in reserves
and utilised to manage pressures within Children and Family Services (£2.051 million). 
In addition, the Year-End position also includes an amount of specific funding received
in relation to the IJB that will be retained in the Council’s Balance Sheet and will be
available for use by the IJB (£6.840 million).   
8. Loan Charges: After taking into account the £1.362 million agreed transfer to reserves
(Executive Committee, 2 February 2022), the loan charges Year-End position is an
underspend of £0.049 million.   
9. Corporate Items - Non COVID: The Year-End position after proposed transfers to
reserves is a net underspend of £2.880 million, including the commitment for Council
Tax Second Homes. 
10. Corporate Items - COVID-19: The underspend of £18.465 million represents the

Page 53

COVID funding held centrally to fund the COVID expenditure that is included within
Resource Year-End positions. 
11. Corporate Items - 2022/2023 Strategy: The Executive Committee (24 June 2020)
approved the transfer of funds totalling £13.550 million to reserves, from the Loans
Fund Review for use in future strategies, leaving a breakeven position after transfers to
reserves. 
12. Investments 2021/2022: The Executive Committee (2 February 2022) approved the
transfer of funds totalling £5.443 million to reserves to reflect the commitments in
relation to the 2021/2022 investments being incurred over 3 financial years, leaving a
breakeven position after transfers.  The final position is a transfer to reserves of £5.884
million, representing a net additional transfer of £0.441 million from probable. 
13. Council Tax including Council Tax Reduction Scheme (CTRS): The Council Tax is
showing an over recovery of £3.058 million, comprising an over recovery of Council Tax
of £2.592 million and an underspend on CTRS of £0.466 million.  This is an increase of
£0.150 million on the position reported as part of the Probable Outturn. 
14. The Council Tax over recovery of £2.592 million is due to the following: 
x Empty Property charges - £0.452 million, 
x Arrears collection - £1.086 million
x Additional in-year properties - £1.062 million
x Income from Council Tax Second Homes - (£0.008) million which is offset by a
corresponding underspend on commitment in Corporate Items 
15. The underspend of £0.466 million on the CTRS reflects current demand for these
payments.

Page 54

Appendix 3
Transfers to Reserves - Approved At Probable 
Purpose / Description Resource  Value
£m
Resources
Primary 4 and 5 Free School Meals
Funding to be carried forward to meet the expansion programme of FSM for P4 and P5 into
2022/2023 for April to June 2022.
Community and Enterprise 0.273
Good Food Nation / Food Development Officer
Funding required to support outcome of the new Good Food Nation's Bill introduced by the SG
and the Food Development officer post.
Community and Enterprise 0.080
Crematorium Sink Fund
Annual contribution to the Crematorium sinking fund to maintain asset replacement programme.
Community and Enterprise 0.025
Electric Sweeper – Payback
Ring-fenced reserves used to manage purchase of electric vehicles in short term which have to
be repaid over next few years. This contribution is the second repayment.
Community and Enterprise
0.015
Fleet Sinking Fund
Annual contribution to the Fleet sinking fund to maintain asset replacement programme.  
Community and Enterprise
0.025
Legal Costs – Planning Building Standards
Funding to support exceptional legal costs as a result of public inquiries and planning appeals in
2022/23.  
Community and Enterprise
0.075
Approved Building Standards Staffing Structure
This is funding required to fund the temporary staffing structure in Planning Building Standards
service as approved at Community and Enterprise Committee December 2021.  
Community and Enterprise
0.230
Total Community and Enterprise Resources   0.723
Adjust: increase in transfer to reflect decreased spend achieved during the financial year.  0.017
Revised Community and Enterprise Resources   0.740   
Pupil Equity Fund
The funding received from the Government can be used up to the end of the school term (June
2022). The underspend reflects the element of the funding that will be utilised in April to June
2022.
Education 3.500
Early Years 1140
This transfer relates to the underspend on the current year specific grant allocation to be carried
forward to meet the commitments in line with the spend profile of the project.
Education 2.797
Additional Teachers Funding (April-June element)
This transfer relates to the underspend on the current year grant allocation to be carried forward
to meet the cost of the additional teachers up to the end of the school term (April to June 2022).
Education 0.845
Child Disability Payment Support
The funding received covers the new burden associated with the introduction of Child Disability
Payment with staffing not expected to be in post until 2022/23 following Committee approval in
February 2022.
Education 0.083
COVID – CO2 Monitors
The transfer relates to COVID funding received to assist with CO2 monitors in schools has not
been fully utilised in the current year which requires to be carried forward to meet commitments
in 2022/2023.
Education - COVID 0.070
Total Education Resources  7.295
Adjust: reduction in transfers to reflect increased spend achieved during the financial year.  (0.350)
Revised Education Resources   6.945   
Area Committee Grants
This transfer reflects the underspend in Area Grants monies in 2021/2022.
Finance and Corporate 0.063
National Trauma Training Post
Funding from the Scottish Government for a post but due to timing of recruitment, post will not be
filled in the current year and transfer is required to meet commitment in 2022/2023.
Finance and Corporate 0.050
Total Finance and Corporate Resources  0.113   
Scheme of Assistance
The Scheme of Assistance funding was not fully utilised in 2021/2022, and it is proposed that the
funding is carry forward to meet commitments in future years. 
Housing and Technical 0.289
Total Housing and Technical Resources  0.289
Adjust: reduction in transfers to reflect reduced spend achieved during the financial year.  0.109
Revised Housing and Technical Resources  0.398   
Total Resource Transfers to Reserves  8.420
Adjust: Total reduction in transfers to reflect increased spend during the financial year. (0.224)
Revised Resource Transfers to Reserves at Year-End 8.196

Page 55

Loan Charges
Loan Charges – Additional Underspend
In 2021/2022, there is an additional underspend due to lower than anticipated interest costs as a
result of not taking any long-term borrowing during 2021/2022. 
Loan Charges 1.362
Interest on Revenue Balances – Reserves
This is the interest on Reserves balances and the transfer will be added to the balances on each
Balance Sheet Reserve as appropriate.
Loan Charges 0.005
Total Loan Charges Transfers to Reserves   1.367
Adjust: Total increase in transfers to reflect additional interest received during the financial year.  0.005
Revised Loan Charges Transfers to Reserves  1.372   
Corporate Items
Utilities
An amount was included in the Strategy for anticipated increases in utility prices. Due the way
that energy has been purchase, this funding is not required in the current year and the
underspend will be carried forward to assist in managing price increases into 2022/2023. 
Corporate Items 1.228
Business Rates Incentive Scheme
The Council has been notified of a refund in relation to the 2019/2020 Business Rates Incentive
Scheme. The transfer is to allow this benefit to be used in the 2022/2023 Strategy.
Corporate Items 0.225
Central Energy Efficiency Fund (CEEF)
Resources are allocated funding from the CEEF Reserve to pay for spend to save projects which
they repay over future years from the revenue savings generated by the project. This transfer
represents the payback of savings from Resources and allows the Reserve to be regenerated for
use on future projects.
Corporate Items 0.222
Council Tax Second Homes
This transfer represents the over recovery of income from Council Tax on second homes
included in the Council’s Council Tax income line.  This is required to be transferred to the
Housing Revenue Account for use on social housing.
Corporate Items 0.570
Total Corporate Transfers to Reserves  2.245
Adjust: Total increase in transfers to reflect reduced income received during the year  (0.030)
Corporate Transfers to Reserves at Year-End 2.215   
Corporate Items - COVID  
COVID - Non Specific Funding
The 2021/2022 costs of COVID recovery have been managed primarily using the funding in
reserves carried forward from 2020/2021.  This allows elements of the new funding received in
2021/2022 to be carried forward to meet the costs of recovery moving forward. 
15.600
COVID Specific Funding
Funding was received in 2021/2022 to assist with Education Recovery.  This transfer represents
the element required to assist with the costs for the remainder of the school year. 
3.011
Total Corporate Items - COVID Transfers to Reserves  18.611
Adjust: Total increase in transfers to reflect reduced expenditure during the year  5.234
Revised Corporate Items - COVID Transfers to Reserves   23.845   
Corporate Items - 22/23 Strategy  
Loans Funds Review 
The Executive committee approved a transfer to reserves in respect of the Loans Fund Review. 
13.550
Total Corporate Items - 22/23 Strategy  13.550   
Investments  
Investments 2021/2022
A report to the Executive Committee (22 September 2021) highlighted that the investment
monies would be spent across multiple years.  This transfer is to meet the commitments in future
years.
Investments 5.443
Total Investments Transfers to Reserves  5.443
Adjust: Total increase in transfers to reflect reduced expenditure during the year  0.441
Revised Investments Transfers to Reserves  5.884   
Total Transfers to Reserves Approved at Probable Year-End 49.636
Adjust: Total net increase in transfers to reflect Year-End position (Resources and Corporate
Items).  This is the total of all the amounts under “adjust” in the table above 
5.426
Revised Transfers to Reserves Approved at Probable Outturn 55.062

Page 56

Appendix 4
Transfers to Reserves – Additional Proposed Transfers at Year-End 
Purpose / Description Resource  Value
£m
Resources
Training Laptops
Transfer to fund the 101 training laptops for primary schools which were ordered in 2021/22 but
due to COVID and supply chain delays, will not be delivered until 2022/23.
Community and Enterprise 0.062
Office Accommodation Moves – Montrose House Staff
Due to delay in the move to Almada Street by Montrose House staff due to vaccination centre
and election accommodation requirements, planned repair works and equipment requirements
have been delayed until July 2022.
Community and Enterprise 0.050
Chatelherault – Rock Slope Inspection
This is to fund inspection work on dangerous rock slopes within Chatelherault Country park.  This
is a contractual commitment. 
Community and Enterprise 0.026
Lammermoor
Funding required to complete the contractual commitment in relation to upgrading of allotment
works at Lammermoor.   
Community and Enterprise 0.005
Environmental Flare System
This funding is required to meet the IT costs in relation to Environmental Services Flare system
as a result of system upgrade and parallel running costs. 
Community and Enterprise 0.030
Strategic Waste Fund
The contribution is the result of higher than anticipated income from Fibre and recyclate
contracts and is required to support future contract costs for waste streams in 2022/23.  
Community and Enterprise 0.302
Total Community and Enterprise Resources Proposed Transfers   0.475
Teachers NQT Group 2
This transfer reflects the prepayment of funding in 2021/22 for Newly Qualified Teachers for the
period April to June 2022.  
Education 0.293
School Support Job Evaluation
This transfer relates to funding required to support outcomes of the job evaluation in Support
Services. 
Education 0.086
Education – Capital Items Replacement Fund
In line with Delegated School Management guidelines within schools, this reflects spend to be
incurred up to the end of school term (June 2022) and contribution to the Replacement
Equipment Fund.  The transfer is required to allow the spend to be undertaken in April to June
2022.  
Education 0.571
Total Education Resources Proposed Transfers 0.950
Employability Projects
Due to the timing of monies received and the timetable for project delivery, this external
Employability Project funding requires to be carried forward to ensure the projects can continue
in 2022/2023. The projects are No-one Left Behind £0.114m, Parental Employability Support
£0.156m, and Youth Guarantee £0.490m.
Finance and Corporate 0.760
Total Finance and Corporate Resources Proposed Transfers 0.760
Adults and Older People
This transfer represents an over provision of funding to the Integrated Joint Board which will be
transferred to reserves and utilised to manage pressures within Children and Family Services.
Social Work 2.051
Total Social Work Resources 2.051   
Total Resource Proposed Transfers to Reserves  4.236   
Corporate Items  
Feed In Tariff
Carry forward income received from energy transferred back to the grid for use on future energy
efficiency projects.
Corporate Items 0.051
Renewable Heat Initiative Income 
Carry forward subsidy income received from the Government for use on future energy efficiency
related projects.
Corporate Items 0.369
Whole of Family Wellbeing GRG
This transfer reflects General Revenue Grant received late in the financial year which requires to
be carried forward to meet commitments in 2022/2023.
Corporate Items 0.187
Telecare Fire Safety GRG
This transfer reflects General Revenue Grant received late in the financial year which requires to
be carried forward to meet commitments in 2022/2023.
Corporate Items 0.059
Total Corporate Items Proposed Transfers to Reserves 0.666   
Total Proposed Transfers to Reserves at Year-End
(Resources and Corporate Items)
4.902

Page 57

Appendix 5
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report
Year Ended 31 March 2022 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
31/03/22
Actual 
31/03/22
Variance
31/03/22 
% Variance
31/03/22 Notes              
Budget Category             
Employee Costs 14.090 13.842 0.248 0.248 14.090 13.957 0.133 under 0.9% 1
Property Costs 46.061 45.666 (0.605) (0.605) 46.061 46.893 (0.832) over (1.8%) 2
Supplies & Services 0.879 0.841 0.038 0.038 0.879 0.701 0.178 under 20.3% 
Transport & Plant 0.195 0.167 0.028 0.028 0.195 0.153 0.042 under 21.5% 
Administration Costs 5.465 5.633 0.012 0.012 5.465 5.485 0.160 under 2.8% 
Payments to Other Bodies 3.076 3.113 (0.037) (0.037) 3.076 3.130 (0.054) over (1.8%) 
Payments to Contractors 0.100 0.097 0.003 0.003 0.100 0.069 0.031 under 31.0% 
Transfer Payments 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.0% 
Financing Charges 19.637 19.662 (0.025) (0.025) 19.637 19.744 (0.107) over (0.5%) 
Total Controllable Exp. 89.683 90.021 (0.338) (0.338) 89.683 90.132 (0.449) over (0.5%) 
Total Controllable Inc. (106.485) (106.823) 0.338 0.338 (106.485) (108.765) 2.280 over
recovered 2.1% 3
Transfer to/(from) Balance
Sheet 0.971 0.971 0.000 0.000 0.971 2.917 (1.946) over 200.4% 4
Net Controllable Exp. (15.831) (15.831) 0.000 0.000 (15.831) (15.716) (0.115) over (0.7%) 
Loan Charges 15.831 15.831 0.000 0.000 15.831 15.716 0.115 under 0.7%  
Net Controllable Exp. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.0% 
Variance Explanations 
1. Employee Costs 
This underspend reflects higher than anticipated staff turnover within the Service, partially offset by the additional costs of the agreed pay award. 
2. Property Costs 
This overspend reflects demand in relation to repairs and grounds maintenance. 
3. Income 
This over recovery reflects income from house rents being higher than anticipated and also income from repairs and insurance recoveries, offset by additional
expenditure. 
4. Transfer to / (from) Balance Sheet 
The net overspend across expenditure has resulted in a lower transfer to reserves being anticipated to date, mainly due to the additional costs of the agreed pay
award.

Page 58

No embedded text on this page.

Page 59

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2021/2022 - Detailed
Resource Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
i update members of the Financial Resources Scrutiny Forum of progress on the
Council’s revenue budget for the period covering 1 April 2021 to 31 March 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the 2021/2022 detailed financial analysis as at period 14 (31 March 2022)
before transfers to reserves for each of the individual Resources, be noted. 
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for 2021/2022 as at 31 March 2022.  The detailed papers cover
the General Services and also the Housing Revenue Account. 
3.2. As detailed in the Revenue Budget Monitoring Report included in these papers, as
part of the probable outturn exercise, Resources were asked to forecast their
position to 31 March 2022.  As part of this exercise, Resources were asked to take
all known commitments into account. The Revenue Budget Monitoring Report
therefore includes the position before transfers to reserves and also, for information
purposes, the position after taking into account the proposed transfers to reserves. 
3.3. In relation to the information contained in this section of the Financial Resources
Scrutiny Forum Papers, the Resource summaries replicate the before and after
transfer to reserves position, while the information in the trends and variance
analysis concentrates on the position before transfers to reserves at period 14. 
3.4. The following information is provided for each Resource and the Housing Revenue
Account: 
i An Executive Summary showing the top level position to date for each of the
Services (as detailed in the Executive Committee Report) within the Resource and
the Housing Revenue Account as at 31 March 2022 (Period 14). 
i Details of the most significant variances within the Resource and the Housing
Revenue Account across Subjective headings and across Services as at 31
March 2022 (Period 14).
9

Page 60

i A line by line trend analysis of the total Resource expenditure and income across
subjective headings as at 31 March 2022 (Period 14). 
3.5. These are shown in Appendices A to F attached. 
4. Employee Implications
4.1. None 
5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.   
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
7.2. There are no implications for sustainability in terms of the information contained in
this report. 
7. Equality Impact Assessment and Consultation Arrangements
7.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
7.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 August 2022 
Link(s) to Council Values/Priorities/Outcomes
i Accountable, Effective, Efficient and Transparent 
Previous References
i None 
List of Background Papers
i Revenue Ledger prints to 31 March 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance
Ext:  5637 (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk

Page 61

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2022 (No.14)
Community and Enterprise Resources
Annual Forecast Annual Annual Actual
Budget for Year Forecast Forecast to Period 14 Variance
BEFORE Variance Variance Budget to 31/03/22 to 31/03/22
Transfers BEFORE AFTER Proportion BEFORE BEFORE
Transfers Transfers to 31/03/22 Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Facilities, Waste and Grounds 70.587 70.349 0.238 (0.140) 70.587 70.026 0.561 under
Fleet, Environmental and Projects (0.462) 0.497 (0.959) (0.999) (0.462) 0.093 (0.555) over
Leisure and Culture 20.155 20.122 0.033 0.033 20.155 20.115 0.040 under
Planning and Economic Development 2.229 1.555 0.674 0.369 2.229 0.947 1.282 under
Roads 22.070 23.400 (1.330) (1.330) 22.070 23.513 (1.443) over
COVID-19 4.896 8.295 (3.399) (3.399) 4.896 8.073 (3.177) over
Position before Transfers to Reserves 119.475 124.218 (4.743) (5.466) 119.475 122.767 (3.292) over
Transfers to Reserves as at 31/03/22 0.000 1.215 (1.215) over
Position After Transfers to Reserves at 31/03/22 119.475 123.982 (4.507) over
9

Page 62

Community and Enterprise Resources Variance Analysis 2021/22 (Period 14) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 2,085k
under
APT&C Basic/Superannuation/NI -
3,040k under 
Facilities, Streets,
Waste and Grounds -
2,108k under
Fleet, Environmental
and Projects - 708k
under
Planning and
Economic
Development - 261k
under
Roads - 545k under
COVID-19 - (582k)
over 
The variance is mainly due to
vacant posts and turnover,
partially offset by staff working
on COVID-19 based duties. 
Overtime - (879k) over  Facilities, Streets,
Waste and Grounds -
(590k) over, 
Roads - (128k) over
COVID-19 - (140k)
over 
The variance is mainly within
Waste due to the high seasonal
number of bulky uplifts requests
and replacement bins being
delivered and also cover for
staff absences. Within Roads,
the overtime is mainly due to
emergency works. In addition,
overtime is being worked by
staff on COVID-19 based
duties. 
Additional Pension Costs - (67k) over Facilities, Streets,
Waste and Grounds -
(46k) over
The overspend relates to the
ongoing cost of early retirals.

Page 63

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (761k) over Scottish Water - Metered Charges -
(52k) over
Facilities, Streets,
Waste and Grounds -
(34k) over 
The overspend mainly relates to
previous years charges for the
Castlehill transfer Station. 
Repairs and Maintenance - External
Contractors - (181k) over
Facilities, Streets,
Waste and Grounds -
(17k) over 
The overspend mainly relates to
an upgrade of the CCTV
system at the Castlehill
Transfer. 
Planning and
Economic
Development - (53k)
over 
The overspend is within
Building Standards re
dangerous buildings which is
offset by an over recovery in
income. 
Roads - (32k) over  The overspend is mainly due to
the costs of upkeep of the
Depots at East Kilbride and
Carnwath. 
COVID-19 - (82k) over  The expenditure relates to the
Carluke CA Site - Compactor
installation due to the high
volume of waste collected at the
site due to Covid.  
Electricity - (232k) over  Roads - (222k) over The overspend is due to higher
than anticipated electricity costs
for electric vehicle charging
posts as a result of increased
demand.

Page 64

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Cleaning and Janitorial Supplies and
Equipment - (177k) over
COVID-19 - (161k)
over 
The overspend relates to
additional cleaning supplies
required due to COVID19. 
Refuse Uplift - (57k) - over Facilities, Streets,
Waste and Grounds -
(57k) over 
The overspend mainly relates to
charges for refuse uplifts within
schools being greater than
anticipated and also charity
uplifts. 
Supplies and
Services
(1,667k)
over
Computer Equipment Purchase -
(189k) over
Fleet, Environmental
and Projects - (76k)
over 
The overspend is mainly due to
Environmental Services
systems support and
maintenance costs. 
Roads - (76k) over  The overspend is due to Road’s
Services systems support and
maintenance costs being
greater than anticipated, mainly
due to the upgrade in software
within the Parking system.    
Equipment, Apparatus and Tools -
(307k) over 
Facilities, Streets,
Waste and Grounds -
(367k) over 
The overspend is mainly within
Facilities for the purchase of
catering equipment for schools
to replace old or defective
equipment. 
Fleet, Environmental
and Projects - 62k
under
The underspend is mainly due
to lower than anticipated
expenditure on equipment
within the Fleet workshop and
passenger services.

Page 65

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont) 
Furnishings incl Crockery & Linen -
(108k) over 
Facilities, Streets,
Waste and Grounds -
(108k) over 
The overspend relates to the
replacement of old or defective
light equipment, crockery and
cutlery within Facilities
Management Catering service. 
Materials - (1,582k) over  Facilities, Streets,
Waste and Grounds -
(710k) over 
The overspend reflects an
increased level of bin
purchases due to the high
demand for replacement bins
and bins required for new
housing developments. These
costs are partially offset by an
over recovery of income from
the sale of bins. In addition,
there was additional
expenditure within both Streets
and Grounds, offset by
additional income and also
underspends elsewhere within
these services. 
Roads - (832k) over The overspend relates to an
increased level of materials
required for Roads and Lighting
maintenance and also an
increase in the price of
materials.

Page 66

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont) 
Foodstuff General - 370k under  Facilities, Streets,
Waste and Grounds -
376k under 
The underspend is due to a
reduction in food purchases
within the Catering service due
to a reduction in school meal
uptake. 
Protective Clothing - (120k) over  Facilities, Streets,
Waste and Grounds -
(58k) over 
The overspend is mainly due to
the requirement for new
improved waterproof PPE for
operatives within Waste. 
COVID-19 - (60k) over  The overspend is due to
increased requirement for
protective clothing as a result of
COVID19. 
Other Supplies and Services - 271k
under 
Facilities, Streets,
Waste and Grounds -
290k under 
The underspend relates to the
balance of funding from
universal free school meals and
has been transferred to
reserves to meet expenditure
commitments. 
Major Supply of Electrical Power - 76k
under
Roads - 77k under The underspend mainly relates
to a credit received in respect of
previous year’s costs.

Page 67

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant 
(1,134k)
over
Fleet Services - Fuel - (254k) over Fleet, Environmental
and Projects - (250k)
over 
The overspend relates to
expenditure on fuel being
greater than budgeted and is
offset by an over recovery of
income. 
Pool Car Charges Rental - (54k) over COVID-19 - (34k) over  The overspend is mainly due to
the need for Pool Car usage
during the Covid-19 pandemic. 
Licences - 78k under Fleet, Environmental
and Projects - 78k
under 
The underspend is due to a
reduction in Heavy Goods
Vehicle excise duty and is offset
by an under recovery of
income. 
Fleet Services - Repairs - (1,013k)
over 
Fleet, Environmental
and Projects - (1,034k)
over 
The overspend is mainly due to
higher than anticipated
expenditure on outside repairs
and materials/spares and the
timing of the achievement of
efficiencies within Fleet. 
Fleet Service Charges - Vehicle
Maintenance - (170k) over
Facilities, Streets,
Waste and Grounds -
101k under 
The underspend is mainly
within Streets due to a
reduction in the number of
vehicles requiring to be
maintained.

Page 68

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont) 
Fleet Service Charges - Vehicle
Maintenance (cont)
Fleet, Environmental
and Projects - (71k)
over 
The overspend is mainly due to
the maintenance of accident
damaged vehicles which is
recovered through insurance
claims. 
Roads - (173k) over  The overspend is mainly due to
higher than anticipated costs for
ad-hoc repairs to vehicles.   
COVID-19 - (27k) over  The overspend is due to the
requirement for maintenance on
Fleet vehicles being used by
services as a result of COVID-
19. 
Fleet Services - Leasing - 128k under Facilities, Streets,
Waste and Grounds -
106k under 
The underspend is mainly
within Streets due to a
reduction in the number of
vehicles. 
Roads - 141k under The underspend is mainly due
to a number of vehicles being
retained and placed on
extensions rather than new
annual leases. 
COVID-19 - (116k)
over 
The overspend is due to leased
vehicles being retained on
extensions to aid service
delivery during COVID
restrictions and recovery.

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont) 
Fleet Services - Hired Vehicles - 46k
under
Facilities, Streets,
Waste and Grounds -
117k under 
The underspend is mainly due
to less demand for external
hired vehicles within Waste and
Grounds. 
Roads - 46k under  The underspend is due to the
demand for external hires being
less than anticipated. 
COVID-19 - (105k)
over 
The overspend is due to
additional vehicle hires to aid
service delivery during COVID
restrictions and recovery.   
Fleet Services - Fuel - 13k under  Facilities, Streets,
Waste and Grounds -
(49k) over 
The overspend relates to
additional service requests
within Grounds and Waste
which were offset by additional
income.     
Fleet, Environmental
and Projects - 130k
under 
The underspend is due to the
reduction in fuel usage in pool
cars within Fleet services. 
COVID-19 - (90k) over  The overspend relates to fuel
usage by hired and leased
vehicles used for service
delivery as result of COVID-19.

Page 70

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont) 
Hire of External Vehicles - 75k under  Facilities, Streets,
Waste and Grounds -
38k under 
The underspend is due to a
decreased demand for the hire
of external vehicles within the
Street Cleansing Service. 
Roads - 37k under  The underspend is due to a
decreased demand for the hire
of external vehicles within the
Service. 
Administration
Costs
(84k) over Medicals - (71k) over Facilities, Streets,
Waste and Grounds -
(56k) over 
The overspend reflects a higher
than anticipated level of medical
referrals during the year.  
Payments to Other
Bodies
(8k) over Other Local Authorities - 31k under  Fleet, Environmental
and Projects - 51k
under 
The underspend is due to lower
than anticipated spend on
scientific service samples within
Environmental services. 
Roads - (18k) over The overspend is due to
expenditure on Portakabin hires
at the depots. 
Payment to Other Bodies - (65k) over Facilities, Streets,
Waste and Grounds -
19k under 
The underspend reflects lower
than anticipated payments to
SEPA within Waste. 
Leisure - 20k under The underspend relates to the
cancellation of the fireworks
display at Strathclyde Park and
has been used to support
COVID expenditure.

Page 71

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies (cont) 
Payment to Other Bodies (cont) Roads - (117k) over The overspend is due to
increased payments for West of
Scotland Local Authorities,
partially offset by an over
recovery of income. 
Payment to
Contractors
(3,284k)
over
Payment to Trading Services - (180k)
over
Roads - (179k) over The overspend is due to higher
than anticipated costs in
respect of reactive maintenance
within Street Lighting. 
Payment to Private Contractors -
(3,110k) over 
Facilities, Streets,
Waste and Grounds -
247k under 
The underspend is due to the
increased level of income
received for the disposal of
fibres and containers within
Waste. 
Fleet, Environmental
and Projects - (43k)
over 
The overspend mainly relates to
an increase in clinical waste
services which is offset by an
over recovery in income. 
Roads - (1,708k) over The overspend results from an
increased level of sub-
contractors being used due to
staff turnover during the year
and also the level of specialist
works required.

Page 72

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors (cont) 
Payment to Private Contractors (cont)  COVID-19 - (1,605k)
over 
The overspend is mainly due to
cost associated with increased
levels of domestic waste
tonnage disposed of at Civic
Amenity sites as a result of
COVID-19. 
Income 1,648k over
recovered
Contributions from Other Bodies - 87k
over recovered 
Facilities, Streets,
Waste and Grounds -
31k over recovered 
The over recovery is due to
retrospective rebates on food
purchases within Facilities
Management and for works
carried out for the NHS and
Biggar and District Heritage
within the Countryside Ranger
service. 
Fleet, Environmental
and Projects - 45k over
recovered 
The over recovery relates to
income from Transport Scotland
in relation to passenger
services. 
Sales - General - (443k) under
recovered 
Facilities, Streets,
Waste and Grounds -
(904k) under recovered 
The under recovery reflects a
reduction in cash income from
the sale of school meals within
the Catering Service, partially
offset by an over recovery from
the sale of bins.

Page 73

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Sales - General (cont) Roads - 461k over
recovered
The over recovery mainly
relates to higher than
anticipated income from
construction consents within the
Traffic Engineering section. 
Sales - Departments of the Authority -
63k over recovered
Facilities, Streets,
Waste and Grounds -
34k over recovered 
The over recovery relates to an
increase in the sale of bins 
Roads - 29k over
recovered 
The over recovery relates to
rechargeable works carried out
by the Lighting Section.  
Fees and Charges - General - (84k)
under recovered
Facilities, Streets,
Waste and Grounds -
(238k) under recovered 
The under recovery is mainly
due to less income being
recovered from private clients
for Care of Gardens within
Grounds as a result of COVID-
19 and the demand for
bereavement services being
less than anticipated. 
Planning and
Economic
Development - 1,106k
over recovered
The over recovery is mainly due
to the level of Planning
applications being greater than
anticipated.

Page 74

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Fees and Charges - General (cont) Roads - (977k) under
recovered 
The under recovery of income
is due to reduced income for
parking charges and fines as a
result of COVID-19. 
Fees and Charges - Departments of
the Authority - 592k over recovered
Facilities, Streets,
Waste and Grounds -
287k over recovered 
The over recovery is mainly due
to an increase in demand for
additional service requests from
Housing and Technical
Resources for Waste and Street
Cleansing Services. 
Fleet, Environmental
and Projects - 102k
over recovered 
The over recovery is due to the
net effect of increased income
from clinical waste within
Environmental Services,
partially offset by lower than
anticipated services provided to
other Resources for bus hire
within Fleet. 
Planning and
Economic
Development - 34k
over recovered 
The over recovery is mainly due
to the a higher than anticipated
level of Planning applications
and building warrants from
other Resources.     
Roads - 169k over
recovered 
The over recovery is mainly due
to higher levels of rechargeable
works and is offset by additional
expenditure.

Page 75

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Fleet Services - (249k) under
recovered 
Fleet, Environmental
and Projects - (249k)
under recovered 
The under recovery is due to
lower than anticipated income
from taxi inspections within
Fleet due to COVID-19. There
is also an under recovery of
income from asset modification,
road fund licences, fuel, casual
hire and leasing, offset by
reduced expenditure. 
Other Income - 151k over recovered Facilities, Streets,
Waste and Grounds -
68k over recovered
The over recovery mainly
relates to rechargeable works
within Grounds services. 
Fleet, Environmental
and Projects - 133k
over recovered 
The over recovery of income is
mainly due to income recharged
to manufacturers for vehicles
being unavailable due to vehicle
recalls. 
Roads - (41k) under
recovered 
The under recovery mainly
relates to less than anticipated
income recovered from permits,
partially offset by income from
SPT Bus Stop Advertising. 
Recovery from Capital - (395k) under
recovered
Roads - (395k) under
recovered 
The under recovery is due to a
reduction in the level of works
that have been undertaken. 
This is offset by an over
recovery in Sales - General
income above.

Page 76

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Recharges - Departments of the
Authority - 1,895k over recovered
Roads - 1,914k over
recovered 
The over recovery reflects
greater than anticipated income
for reactive maintenance and
lighting works. 
* The underlined variances represent new variances since the last report.

Page 77

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/22 SLC 21/22 2 TO DATE AMOUNT Under
`
EMPLOYEE COSTS
APT & C BASIC 69,059 66,049 3,010 under
APT & C OVERTIME 1,496 2,375 (879) over
APT & C SUPERANNUATION 11,507 11,662 (155) over
APT & C NIC 5,609 5,424 185 under
TRAVEL AND SUBSISTENCE 75 118 (43) over
OTHER EMPLOYEE COSTS 552 546 6 under
PENSION INCREASES 1,106 1,078 28 under
ADDITIONAL PENSION COSTS 0 67 (67) over
EMPLOYEE COSTS 89,404 87,319 2,085 under
PROPERTY COSTS
RATES 912 901 11 under
SCOTTISH WATER - UNMETERED CHARGES 29 26 3 under
SCOTTISH WATER - METERED CHARGES 100 152 (52) over
RENT 757 772 (15) over
SERVICE CHARGE 42 32 10 under
FACTORING CHARGES 16 20 (4) over
PROPERTY INSURANCE 288 286 2 under
SECURITY COSTS 46 51 (5) over
GROUND MAINTENANCE 8 9 (1) over
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 1 (1) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 160 197 (37) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS DIRECT CHARGE 1 0 1 under
LIFE CYCLE MAINTENANCE 0 3 (3) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 358 539 (181) over
GAS HEATING LEASE COSTS 0 1 (1) over
ELECTRICITY - CONTRACT 449 681 (232) over
GAS 86 88 (2) over
HEATING OIL 14 13 1 under
CLEANING CONTRACT 11 35 (24) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 366 543 (177) over
HEALTH & HYGIENE MATERIALS 103 103 0
WINDOW CLEANING 1 0 1 under
REFUSE UPLIFT 407 464 (57) over
OTHER PROPERTY COSTS 20 18 2 under
PROPERTY COSTS 4,174 4,935 (761) over
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 454 643 (189) over
COMPUTER EQUIPMENT MAINTENANCE 75 112 (37) over
I.T. EQUIPMENT MAINT-CONTRACT 287 316 (29) over
I.T. ELECTRONIC MESSAGING 75 89 (14) over
EQUIPMENT, APPARATUS AND TOOLS 726 1,033 (307) over
SMALL TOOLS 107 38 69 under
ADAPTATIONS FOR CLIENTS 0 10 (10) over
FURNITURE - OFFICE 0 42 (42) over
FURNISHINGS (INCL. CROCKERY & LINEN) 220 328 (108) over
MATERIALS 7,939 9,521 (1,582) over
MATERIALS, APPARATUS AND EQUIPMENT 16 10 6 under
AUDIO VISUAL 0 1 (1) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 22 (20) over
FOODSTUFFS - GENERAL 4,766 4,396 370 under
PROTECTIVE CLOTHING & UNIFORMS 186 306 (120) over
LAUNDRY COSTS 10 7 3 under
OTHER SUPPLIES AND SERVICES 445 174 271 under
MAJOR SUPPLY OF ELECTRICAL POWER 1,457 1,381 76 under
DELIVERY CHARGE 1 4 (3) over
SUPPLIES AND SERVICES 16,766 18,433 (1,667) over

Page 78

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/22 SLC 21/22 2 TO DATE AMOUNT Under
`
TRANSPORT AND PLANT
PURCHASE OF PLANT 63 107 (44) over
FLEET SERVICES - DRIVERS 58 58 0
FLEET SERVICES - FUEL 3,109 3,363 (254) over
FLEET SERVICES - VEHICLE HIRE 1,589 1,623 (34) over
POOL CAR CHARGES - RENTAL 56 109 (54) over
POOL CAR CHARGES - FUEL 21 2 20 under
POOL CAR CHARGES - ADDITIONAL COSTS 7 5 2 under
OTHER TRANSPORT COSTS 64 94 (30) over
TRANSPORT INSURANCE 93 93 0
LICENCES 491 413 78 under
FLEET SERVICES - REPAIRS 1,474 2,487 (1,013) over
PLANT SERVICES 19 10 9 under
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,233 4,403 (170) over
FLEET SERVICE CHARGES - UNSCHEDULED LABOUR 0 5 (5) over
FLEET SERVICE CHARGES - PLANT MAINTENANCE 261 238 24 under
FLEET SERVICE CHARGES - ASSET MODIFICATION 70 30 40 under
FLEET SERVICE CHARGES - LEASING 5,099 4,971 128 under
FLEET SERVICE CHARGES - HIRED VEHICLES 1,048 1,002 46 under
FLEET SERVICE CHARGES - CONTRACT HIRE 2 0 2 under
FLEET SERVICE CHARGES - ROAD FUND LICENCE 224 186 38 under
FLEET SERVICE CHARGES - FUEL 2,353 2,339 13 under
FLEET SERVICE CHARGES - DRIVERS 101 103 (2) over
HIRE OF EXTERNAL VEHICLES 76 1 75 under
HIRE OF EXTERNAL PLANT 246 244 2 under
HIRE OF SKIPS 17 19 (2) over
STORAGE 0 3 (3) over
TRANSPORT AND PLANT 20,774 21,908 (1,134) over
ADMINISTRATION 
PRINTING AND STATIONERY 131 133 (2) over
TELEPHONES 105 94 11 under
MOBILE PHONES 64 82 (18) over
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 11 (3) over
ADVERTISING - OTHER 84 89 (5) over
POSTAGES/COURIERS 37 34 3 under
MEMBERSHIP FEES/SUBSCRIPTIONS 50 43 7 under
INSURANCE 260 261 (1) over
MEDICAL COSTS 7 78 (71) over
LEGAL EXPENSES 42 4 38 under
HOSPITALITY / CIVIC RECOGNITION 2 2 0
INTERNET AGENCY FEES 15 27 (12) over
SECURITY UPLIFT FEES 26 23 3 under
OTHER ADMIN COSTS 4 4 0
TRAINING 4 38 (34) over
ADMINISTRATION 839 923 (84) over
PAYMENT TO OTHER BODIES 
SPTE: ANNUAL BUS SUBSIDY 1,788 1,788 0
SPTE: BUS OTHER 258 258 0
SPTE: FERRIES 29 29 0
SPTE: UNDERGROUND 1,318 1,318 0
SPTE: OTHER 1,727 1,706 21 under
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 131 0
OTHER LOCAL AUTHORITIES 95 64 31 under
GRANTS TO VOLUNTARY ORGANISATIONS 22 20 2 under
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 39 0
PAYMENTS TO OTHER BODIES 24,337 24,402 (65) over
EXTERNAL AUDIT FEES 3 0 3 under
PAYMENT TO OTHER BODIES 29,747 29,755 (8) over
PAYMENT TO CONTRACTORS 
PAYMENT TO TRADING SERVICES CONTRACTOR 0 180 (180) over
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 300 2 under
PAYMENT TO PRIVATE CONTRACTOR 39,613 42,723 (3,110) over
PAYMENT TO INTERNAL CONSULTANTS 0 1 (1) over
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 19 14 5 under
PAYMENT TO CONTRACTORS 39,934 43,218 (3,284) over

Page 79

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/22 SLC 21/22 2 TO DATE AMOUNT Under
`
TRANSFER PAYMENTS
CONCESSIONARY FARES 604 604 0
TRANSFER PAYMENTS 604 604 0
FINANCING CHARGES 
LEASING CHARGES - FINANCE 0 19 (19) over
I.T. EQUIPMENT LEASING-CONTRACT 184 252 (68) over
FINANCING CHARGES 184 271 (87) over
TOTAL EXPENDITURE 202,426 207,366 (4,940) over
INCOME
MILK SUBSIDIES FROM THE E.U. (55) (14) (41) under rec
CONTRIBUTIONS FROM OTHER BODIES (17,607) (17,694) 87 over rec
ERDF GRANT (200) (228) 28 over rec
SALES - GENERAL (5,226) (4,783) (443) under rec
SALES - DEPARTMENTS OF THE AUTHORITY (118) (181) 63 over rec
FEES AND CHARGES - GENERAL (8,617) (8,533) (84) under rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,695) (8,287) 592 over rec
ELECTIONS - ACCOMMODATION USE 0 (32) 32 over rec
RENTAL INCOME (615) (627) 12 over rec
FLEET SERVICES (11,696) (11,447) (249) under rec
OTHER INCOME (4,174) (4,325) 151 over rec
RECOVERY FROM CAPITAL (1,333) (938) (395) under rec
RECHARGES - DEPARTMENTS OF THE AUTHORITY (25,615) (27,510) 1,895 over rec
TOTAL INCOME (82,951) (84,599) 1,648 over rec
NET EXPENDITURE 119,475 122,767 (3,292) over

Page 80

No embedded text on this page.

Page 81

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2022 (No.14)
Education Resources
Annual Forecast Annual Annual Actual
Budget for Year Forecast Forecast to Period 14 Variance
BEFORE Variance Variance Budget to 31/03/22 to 31/03/22
Transfers BEFORE AFTER Proportion BEFORE BEFORE
Transfers Transfers to 31/03/22 Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Education 365.619 358.413 7.206 (0.019) 365.619 357.754 7.865 under
COVID-19 11.172 13.111 (1.939) (2.009) 11.172 12.856 (1.684) over
Position before Transfers to Reserves 376.791 371.524 5.267 (2.028) 376.791 370.610 6.181 under
Transfers to Reserves as at 31/03/22 0.000 7.883 (7.883) over
Position After Transfers to Reserves at 31/03/22 376.791 378.493 (1.702) over
9

Page 82

Education Resources Variance Analysis 2021/22 (Period 14) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  3,066k under Teachers Basic / Superannuation /
National Insurance - 892k under 
Schools - 916k under There is an underspend on the
2021/2022 learning recovery
funding allocation for additional
teachers which has been
carried forward to meet the
costs up to the end of the
school term. 
APT&C Basic / Superannuation /
National Insurance - 2,139k under 
Schools - 2,160k under  The underspend mainly relates
to Early Years posts and is the
result of staff turnover and a
delay in recruitment to fill posts. 
Specific grant funding was
provided for the delivery of
1140 hours of Early Years and
this element of the underspend
has been carried forward to
meet the cost of ELC expansion
going forward. 
Property Costs (753k) over Electricity - (561k) over  COVID - (561k) over  The overspend is due to
increased ventilation
requirements within schools
and establishments. 
Solid Fuel - (143k) over COVID - (143k) over  The overspend reflects
increased price and
consumption within schools and
establishments.

Page 83

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services
4,132k under Aids for Clients - (90k) over  Schools - (90k) over  This overspend is due to the
increased demand and cost for
new equipment required by
children in school with complex
physical needs. 
Materials, Apparatus and Equipment -
812k under 
Schools - 815k under  The underspend relates to
schools carry forward, to be
used in the April to June 2022
school session, as part of the
Devolved Management Scheme
in schools. 
Pupil Equity Fund - 2,591k under  Schools - 2,591k under  The underspend reflects the
profile of Pupil Equity Fund
(PEF) spend and commitment
across the academic year in
line with school improvement
plans and has been carried
forward to 2022/2023, to be
used in the April to June 2022
school session. 
Protective Clothing and Uniforms -
109k under 
COVID - 108k under  The underspend is due to less
than anticipated expenditure
incurred on PPE within schools
and establishments throughout
the financial year.

Page 84

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont) 
Catering - 748k under  Schools - 748k under  Expenditure on the provision of
lunches in Early Years
establishments is lower than
anticipated.  This funding has
been carried forward to meet
the costs of Early Years
expansion going forward. 
In addition, there is an
underspend on the Breakfast
Club programme. 
Transport and
Plant
(883k) over Pupil Transport - Special Educational
Needs - (487k) over 
Schools - (487k) over  This relates to the cost of
transporting children to both
mainstream and Special
Education Needs schools. This
is a demand led service and
reflects increasing pupil
numbers and costs.   
Pupil Transport - Strathclyde
Passenger Transport - (408k) over 
Schools - (408k) over  This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs.

Page 85

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies
(191k) over Other Local Authorities - (260k) over  Schools - (260k) over  The overspend is due to an
increase in placements within
other local authorities and is
offset by an over recovery of
income from other local
authorities for placements
within South Lanarkshire
Council establishments. 
Payments to Other Bodies - 1,726k
under 
Schools - 1,728k under  The underspend is partly due to
less than anticipated core Early
Years spend. There is also an
underspend on Early Years
1140 hours funding and this has
been carried forward to meet
the costs of ELC expansion
going forward. 
Independent School Places - (1,827k)
over 
Schools - (846k) over  This overspend reflects the
increased cost of placements
for pupils with additional
support needs in Independent
Schools and is due to both an
increase in the number of
places and the cost of
placements. 
COVID - (981k) over  This overspend reflects the
increased cost of placements
for pupils with additional
support needs in Independent
Schools due to COVID.

Page 86

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies (cont) 
Speech and Language Therapy -
(113k) over
Schools - (113k) over  This overspend reflects
increased contract prices from
the NHS based on the current
number of sessions and also
the level of service being
provided. 
Counselling - 321k under Schools - 321k under The underspend reflects the
profile of spend on Counselling
Services across the academic
year, which is due to continue in
the April to June 2022 school
session. 
Transfer Payments 113k under Footwear and Clothing Grants - 111k
under 
Schools - 111k under The underspend reflects the
expenditure on footwear and
clothing grants during the year. 
Income 556k over
recovered 
Contributions from Other Bodies -
(131k) under recovered
Schools - (131k) under
recovered
The under recovery reflects less
than budgeted grant income
and contributions across the
Resource including Music,
CQIS and Youth Employability
Services.

Page 87

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Contributions from Other Local
Authorities - 371k over recovered 
Schools - 371k over
recovered 
This over recovery reflects
payments from other local
authorities for placements
within South Lanarkshire
Council establishments.  This
over recovery offsets the cost of
placements within other local
authorities. 
Early Years Fees - 326k over
recovered 
Early Years - 326k over
recovered
The over recovery in Early
Years fees relates to an
increased uptake of available
nursery places beyond 1140
hours. 
* The underlined variances represent new variances since the last report.

Page 88

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS BASIC 158,183 158,655 (472) over
TEACHERS SUPERANNUATION 37,659 36,473 1,186 under
TEACHERS NI 17,531 17,353 178 under
DAILY TEACHERS BASIC 3,401 3,237 164 under
TEACHERS TRAINING 458 481 (23) over
APT&C BASIC 61,182 59,311 1,871 under
APT&C OVERTIME 19 77 (58) over
APT&C SUPERANNUATION 11,234 11,241 (7) over
APT&C NIC 4,544 4,269 275 under
SESSIONAL WORK 192 235 (43) over
TRAVEL AND SUBSISTANCE 134 89 45 under
OTHER EMPLOYEE COSTS 1,799 1,850 (51) over
PENSION INCREASES 434 463 (29) over
PREMATURE RETIRALS 4,660 4,597 63 under
ADDITIONAL PENSION COSTS 0 33 (33) over
EMPLOYEE COSTS 301,430 298,364 3,066 under
PROPERTY COSTS
RATES 14,508 14,533 (25) over
SCOTTISH WATER - UNMETERED CHARGES 6 0 6 under
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 986 1,028 (42) over
SCOTTISH WATER - METERED CHARGES 644 622 22 under
RENT 246 239 7 under
SERVICE CHARGE 45 68 (23) over
PROPERTY INSURANCE 484 491 (7) over
SECURITY COSTS 20 22 (2) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 26 37 (11) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 17 46 (29) over
ADAPTIONS - INTERNAL CONTRACTORS 170 156 14 under
GAS MAINTENANCE COSTS 0 1 (1) over
ELECTRICITY  - CONTRACT 3,753 4,314 (561) over
GAS 2,239 2,239 0
HEATING OIL 71 80 (9) over
SOLID FUEL 187 330 (143) over
JANITOR SERVICE 68 47 21 under
JANITORIAL SUPPLIES 2 0 2 under
CLEANING CONTRACT 1,664 1,709 (45) over
CLEANING OUTWITH CONTRACT 5 0 5 under
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 751 665 86 under
HEALTH & HYGIENE MATERIALS 139 162 (23) over
REFUSE UPLIFT 14 16 (2) over
REMOVAL & STORAGE COSTS 1 1 0
OTHER PROPERTY COSTS 482 475 7 under
ACCOMMODATION RECHARGE TO USERS 882 882 0
PROPERTY COSTS 27,410 28,163 (753) over
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 670 672 (2) over
COMPUTER EQUIPMENT MAINTENANCE 0 10 (10) over
COMPUTER EQUIPMENT RENTAL 1 0 1 under
I.T. EQUIPMENT MAINT-CONTRACT 3,580 3,578 2 under
I.T. ELECTRONIC MESSAGING 74 76 (2) over
EQUIPMENT, APPARATUS AND TOOLS 58 71 (13) over
SMALL TOOLS 9 9 0
AIDS FOR CLIENTS 114 204 (90) over
FURNITURE - OFFICE 66 75 (9) over
FURNITURE - GENERAL 124 133 (9) over
FURNISHINGS (INCL. CROCKERY & LINEN) 13 13 0
MATERIALS 30 37 (7) over
MATERIALS, APPARATUS AND EQUIPMENT 4,156 3,344 812 under
PUPIL EQUITY FUNDING 2,608 17 2,591 under
LIBRARY/RESOURCE CENTREMATERIALS 81 77 4 under
AUDIO VISUAL 28 31 (3) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 19 24 (5) over
TV LICENCES - EDUCATION 27 27 0
FOODSTUFFS - GENERAL 154 169 (15) over
PROTECTIVE CLOTHING & UNIFORMS 325 216 109 under
LAUNDRY COSTS 1 1 0
OTHER SUPPLIES AND SERVICES 64 40 24 under
HEALTH AND SAFETY 3 2 1 under
CATERING - CONTRACT 3,238 2,490 748 under
CATERING - OUTWITH CONTRACT 6 2 4 under
CATERING - EXTERNAL 21 22 (1) over
ARTIST FEES / PERFORMING ARTS / ENTERTA 6 8 (2) over
DELIVERY CHARGE 8 4 4 under
SUPPLIES AND SERVICES 15,484 11,352 4,132 under

Page 89

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 13 25 (12) over
OTHER TRANSPORT COSTS 3 1 2 under
INSURANCE 3 3 0
FLEET SERVICE CHARGES - SCHEDULED MAINTENANCE 43 10 33 under
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 27 26 1 under
FLEET SERVICE CHARGES - LEASING 52 53 (1) over
FLEET SERVICE CHARGES - HIRED VEHICLES 9 17 (8) over
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 4 7 (3) over
FLEET SERVICE CHARGES - FUEL 68 102 (34) over
FLEET SERVICE CHARGES - DRIVERS 1,095 1,101 (6) over
FLEET SERVICE CHARGES - BUS ESCORTS 368 378 (10) over
HIRE OF EXTERNAL VEHICLES 83 52 31 under
HIRE OF EXTERNAL PLANT 0 1 (1) over
HIRE OF SKIPS 10 12 (2) over
EXTERNAL TRANSPORT CONTRACT 2 2 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 5,193 5,680 (487) over
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 5,496 5,904 (408) over
PUPIL TRANSPORT - OTHER 279 257 22 under
TRANSPORT AND PLANT 12,748 13,631 (883) over
ADMINISTRATION
PRINTING AND STATIONERY 838 819 19 under
TELEPHONES 218 206 12 under
MOBILE PHONES 29 38 (9) over
ADVERTISING - OTHER 14 9 5 under
POSTAGES/COURIERS 67 57 10 under
MEMBERSHIP FEES/SUBSCRIPTIONS 333 339 (6) over
INSURANCE 76 76 0
MEDICAL COSTS 24 35 (11) over
LEGAL EXPENSES 0 3 (3) over
HOSPITALITY / CIVIC RECOGNITION 4 5 (1) over
SECURITY UPLIFT FEES 7 7 0
OTHER ADMIN COSTS 4 5 (1) over
CONFERENCES - OFFICIALS (incl associated costs) 52 0 52 under
TRAINING 437 441 (4) over
ADMINISTRATION 2,103 2,040 63 under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 0 29 (29) over
OTHER LOCAL AUTHORITIES 1,178 1,438 (260) over
SCOTTISH QUALIFICATIONS AUTHORITY 1,563 1,554 9 under
PAYMENTS TO VOLUNTARY ORGANISATIONS 29 29 0
PAYMENTS TO OTHER BODIES 19,234 17,508 1,726 under
AGENCY FEES - COLLECTION OF COUNCIL TAX 0 3 (3) over
INDEPENDENT SCHOOL PLACES 3,907 5,734 (1,827) over
CONTRACT SPEECH THERAPY 678 791 (113) over
SCHOOL ACTIVITIES 268 276 (8) over
RESEARCH GRANTS - EDUCATION 40 40 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 26 6 20 under
P.E. FACILITIES 15 8 7 under
ACTIVITIES PROGRAMME 716 732 (16) over
COUNSELLING 948 627 321 under
COPYRIGHT AGREEMENT 189 186 3 under
VAT FREE EXCURSIONS - EDUCATION 1 22 (21) over
PRIVATE INDIVIDUALS - GENERAL 26 26 0
PAYMENT TO OTHER BODIES 28,818 29,009 (191) over
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 35,833 35,774 59 under
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SE 3 3 0
PAYMENT TO CONTRACTORS 35,836 35,777 59 under
TRANSFER PAYMENTS
EDUCATION MAINTENANCE ALLOWANCE 994 994 0
FOOTWEAR & CLOTHING GRANTS 1,877 1,766 111 under
WORK EXPERIENCE 2 0 2 under
TRANSFER PAYMENTS 2,873 2,760 113 under

Page 90

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 6 4 2 under
I.T. EQUIPMENT LEASING - CONTRACT 340 323 17 under
FINANCING CHARGES 346 327 19 under
TOTAL EXPENDITURE 427,048 421,423 5,625 under
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) (170) 0
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (44,551) (44,556) 5 over rec
MILK SUBSIDIES FROM THE SCOTTISH OFFICE (66) (57) (9) under rec
CONTRIBUTIONS FROM OTHER BODIES (1,922) (1,791) (131) under rec
ESF GRANT (471) (471) 0
FEES AND CHARGES - GENERAL 0 (1) 1 over rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,358) (1,729) 371 over rec
PLAYGROUP ACCOMMODATION CHARGE (25) (14) (11) under rec
EARLY YEARS FEES (695) (1,021) 326 over rec
RENTAL INCOME (20) (15) (5) under rec
COURSE FEES (72) (72) 0
INSURANCE RECOVERIES 0 (6) 6 over rec
OTHER INCOME (24) (27) 3 over rec
ACCOMMODATION INCOME FROM USERS (883) (883) 0
INCOME (50,257) (50,813) 556 over rec
NET EXPENDITURE 376,791 370,610 6,181 under

Page 91

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2022 (No.14)
Finance and Corporate Resources
Annual Forecast Annual Annual Actual
Budget for Year Forecast Forecast to Period 14 Variance
BEFORE Variance Variance Budget to 31/03/22 to 31/03/22
Transfers BEFORE AFTER Proportion BEFORE BEFORE
Transfers Transfers to 31/03/22 Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Finance Services (Strategy) 2.340 2.340 0.000 0.000 2.340 2.318 0.022 under
Finance Services (Transactions) 18.133 17.999 0.134 0.134 18.133 17.897 0.236 under
Audit and Compliance Services 0.394 0.394 0.000 0.000 0.394 0.154 0.240 under
Information Technology Services 4.733 4.790 (0.057) (0.057) 4.733 5.914 (1.181) over
Communications and Strategy Services 2.547 2.682 (0.135) (0.135) 2.547 2.760 (0.213) over
Administration and Licensing Services 4.207 4.646 (0.439) (0.502) 4.207 4.658 (0.451) over
Personnel Services 11.384 10.870 0.514 0.464 11.384 9.184 2.200 under
COVID-19 0.000 8.624 (8.624) (8.624) 0.000 8.209 (8.209) over
Position before Transfers to Reserves 43.738 52.345 (8.607) (8.720) 43.738 51.094 (7.356) over
Transfers to Reserves as at 31/03/22 0.000 0.873 (0.873) over
Position After Transfers to Reserves at 31/03/22 43.738 51.967 (8.229) over
9

Page 92

Finance and Corporate Resources Variance Analysis 2021/22 (Period 14) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  68k under  APT&C Basic / Superannuation /
National Insurance - 150k under 
Audit - (88k) over 
IT Services - (364k)
over
Administration, Legal
and Licensing Services
- (107k) over 
These overspends are due to
lower than anticipated staff
turnover across the Services. 
Finance Services
(Transactions) - 373k
under 
The underspend is due to
vacant posts within Benefits
and Revenues and also within
the customer service centre.
This is partly offset by the
overspend on overtime and
an under recovery of income 
Communications and
Strategy - 133k under
The variance is due to
vacancies which are being
considered in line with service
requirements. 
Personnel Services -
740k under 
The variance in employee
costs reflects the underspend
in employability and funded
projects. 
COVID-19 - (513k) over  The overspend reflects
additional staff costs including
the administration of Self
Isolation and pandemic
payments.

Page 93

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont) 
Overtime - (339k) over  Finance Services
(Transactions) - (178k)
over 
The overspend is due to
overtime within Benefits and
Revenues to cover vacancies
and for staffing requirements
within the 24 hour control
centre and is offset by the
underspend in Basic Pay 
COVID-19 - (123k) over  The overspend relates to
staffing in relation to the
processing of COVID-19 
grant payments. 
Other Employee Costs - 339k under  Personnel Services -
338k under 
The underspend reflects the
level of Modern Apprentices
during the year. 
Pension Increases / Additional
Pension Costs - (103k) over 
Finance Services
(Transactions) - (28k)
over
IT Services (31k) over
Personnel Services -
(35k) over 
The overspends reflect the
ongoing cost of early retirals
and these have been
managed within the overall
budget.

Page 94

Subjective Head Variance Subjective line Service / amount Explanation
Property Costs  (774k) over Electricity - 294k under  IT Services - 281k
under 
This underspend reflects the
closure of the Caird Data
Centre. The underspend has
been to offset the costs of the
new cloud hosting service.
Budgets will be realigned in
the new financial year. 
Fixtures and Fittings - (1,012k) over COVID-19 - (1,006k)
over 
The overspend relates to
additional Scottish Welfare
payments as a result of
COVID-19 and is offset by
Scottish Government funding. 
Supplies and
Services 
(5,983k) over  Computer Equipment Purchase -
(293k) over 
Finance Services
(Transactions) - (115k)
over
IT Services - (73k) over
Administration, Legal
and Licensing Services
- (53k) over 
The overspend reflects the
current requirement for IT
contract payments. 
Computer Equipment Maintenance -
90k under 
IT Services - 63k under  The underspend is due to
less than anticipated
maintenance and project
support costs.

Page 95

Subjective Head Variance Subjective line Service / amount Explanation
Supplies and
Services (cont) 
IT Equipment Maintenance - Contract
- 130k under 
IT Services - 141k
under 
The underspend is due to
less than anticipated
maintenance and project
support costs and has been
used to manage the cost of
the new cloud hosting
service. Budgets will be
realigned in the new financial
year. 
Foodstuffs - General - (72k) over  COVID-19 - (99k) over  The overspend relates to the
Foodbank expenditure and is
offset by Scottish
Government funding. 
Other Supplies and Services -
(5,767k) over 
COVID-19 - (5,724k)
over 
This overspend relates mainly
to the costs of spring hardship
and low income pandemic
payments and is offset by
Scottish Government funding. 
Free School Meals - COVID19 -
(123k) over
COVID-19 - (123k) over The overspend relates mainly
to the provision of school
meals to those children self-
isolating and is offset by
Scottish Government funding. 
Administration
Costs
(1,153k) over Telephones - 216k under  IT Services - 205k
under 
This underspend relates to
lower than anticipated
telephone expenditure and is
partially offset by an under
recovery of income.

Page 96

Subjective Head Variance Subjective line Service / amount Explanation
Administration
Costs (cont) 
Mobile Phones - (248k) over  IT Services - (229k)
over 
The overspend reflects the
demand for handsets across
all Resources and is offset by
additional income from
recharges. 
Other Admin Costs - (1,075k) over  IT Services - (738k)
over 
The overspend reflects the
cost of the new cloud hosting
service.  Budgets will be
realigned in the new financial
year. 
Members Allowances - 97k under  Administration, Legal
and Licensing Services
- 97k under 
The underspend mainly
relates to a reduction in travel
due to COVID-19. 
Training - (55k) over Personnel Services
(46k) over 
This overspend relates to
external supported
employment training and is
offset by additional income. 
Payment to Other
Bodies
245k under  Grants to Voluntary Organisations -
166k under 
Administration, Legal
and Licensing Services
- 166k under 
The underspend reflects a
reduction in the uptake of
grants to voluntary
organisations. A transfer to
reserves was made to meet
commitments in 2022/2023.

Page 97

Subjective Head Variance Subjective line Service / amount Explanation
Payment to Other
Bodies (cont) 
Payments to Other Bodies - 232k
under
Personnel Services -
575k under 
The underspend reflects the
timing of the commencement
of employability programs due
to COVID.  The underspend
within employability was
transferred to reserves to
meet commitments going
forward. 
COVID-19 - (408k) over  This is payments made to
third sector organisations
during the pandemic and is
offset by Scottish
Government COVID funding. 
Private Individuals - General - (106k)
over 
COVID-19 - (100k) over  This reflects financial
assistance being provided to
tenants and is offset by
Scottish Government funding. 
Transfer Payments  1,823k under Rent Allowance - 3,207k under  Finance Services
(Transactions) - 3,207k
under 
The underspend reflect the
level of Housing Benefit
payments for private housing
tenants and is offset by an
under recovery of income.

Page 98

Subjective Head Variance Subjective line Service / amount Explanation
Transfer Payments
(cont) 
Rent Rebate - (1,384k) over  Finance Services
(Transactions) -
(1,196k) over 
This overspend reflects the
level of Housing Benefit
payments for council housing
tenants. 
In addition, there is an
overspend on Discretionary
Housing Payments (DHP),
offset by an over recovery of
DHP income. 
COVID-19 - (188k) over  The overspend relates to the
benefits associated with
additional accommodation
requirements due to COVID-
19. 
Income (1,587k)
under
recovered 
Non-Relevant Government Grant -
358k over recovered 
COVID-19 - 358k over
recovered 
The over recovery relates to
Scottish Government funding
for the administration of the
payments of business support
and self isolation support
payments, offset by employee
cost expenditure. 
Statutory Additions - Cost of
Collection - (58k) under recovered 
Finance Services
(Transactions) - (58k)
under recovered 
The under recovery is due to
a reduction in the number of
cases going to the reminder
stage and subsequently
progressing to summary
warrant.  As a result, there
has been a reduction in
income from penalty charges.

Page 99

Subjective Head Variance Subjective line Service / amount Explanation
Income (cont)  Rent Rebates Subsidy - (691k) under
recovered 
Finance Services
(Transactions) - (691k)
under recovered 
This under recovery reflects
the level of Housing Benefit
for council housing tenants. 
Rent Allowance Subsidy - (3,089k)
under recovered 
Finance Services
(Transactions) -
(3,089k) under
recovered 
This under recovery reflects
the level of Housing Benefit
for private housing tenants
and is offset by an
underspend on Transfer
Payments. 
DHP - 1,921k over recovered  Finance Services
(Transactions) - 1,921k
over recovered 
The over recovery relates to
income from the Department
of Works and Pensions for
Discretionary Housing
Payments and is offset by
additional rent rebate
expenditure (see Transfer
Payments). 
Contributions from Other Bodies -
408k over recovered 
Finance Services
(Transactions) - 80k
over recovered 
The over recovery relates to
the receipt of Payment
Deduction Project (PDP)
income from the Department
of Work and Pensions in
relation to the recovery of
Housing Benefit
overpayments.

Page 100

* The underlined variances represent new variances since the last report
Subjective Head Variance Subjective line Service / amount Explanation
Income (cont)  Contributions from Other Bodies
(cont)
Personnel Services -
328k over recovered 
The over recovery reflects the
timing of receipt of income for
externally funded projects. 
European Social Fund (ESF) Grant -
375k over recovered 
Audit Services - 103k
over recovered,
Personnel Services -
272k over recovered 
This over recovery reflects
the recovery of management
fee income plus additional
income received from Europe
as a consequence of an
increase in the intervention
rate on previous year claims. 
Sales - General - (89k) under
recovered
Personnel Services -
(89k) under recovered 
The under recovery relates to
reduced income at the
Coalyard and Cafés due to
reduced footfall and is offset
by reduced expenditure. 
Fees and Charges - General - (52k)
under recovered 
Administration, Legal
and Licensing Services
- (112k) under
recovered 
The under recovery of income
is primarily due to the current
uptake of licenses for private
hire operators which is lower
than anticipated. 
Fees and Charges - Departments of
the Authority - (503k) under recovered 
Communications and
Strategy - (438k) under
recovered 
The under recovery reflects
lower than anticipated income
from recharges to other
Resources, offset by a
reduction in expenditure.

Page 101

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 26,309 26,574 (265) over
APT & C OVERTIME 45 384 (339) over
APT & C SUPERANNUATION 5,307 4,937 370 under
APT & C NIC 2,559 2,514 45 under
MANUAL BASIC 15 14 1 under
TRAVEL AND SUBSISTANCE 34 14 20 under
OTHER EMPLOYEE COSTS 475 136 339 under
PENSION INCREASES 832 911 (79) over
ADDITIONAL PENSION COSTS 0 24 (24) over
EMPLOYEE COSTS 35,576 35,508 68 under
PROPERTY COSTS
RATES 109 93 16 under
SCOTTISH WATER - METERED CHARGES 9 6 3 under
RENT 50 87 (37) over
SERVICE CHARGE 2 1 1 under
FEU DUTIES 1 0 1 under
PROPERTY INSURANCE 4 3 1 under
SECURITY COSTS 103 166 (63) over
REPAIRS & MAINTENANCE - INTERNAL CONTRATOR 1 4 (3) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRATOR 2 0 2 under
ELECTRICITY  - CONTRACT 440 146 294 under
GAS 14 6 8 under
MULTI-STOREY HEAT/LIGHT 0 1 (1) over
FIXTURE & FITTINGS 1,736 2,748 (1,012) over
CLEANING CONTRACT 0 3 (3) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 2 0 2 under
HEALTH & HYGIENE MATERIALS 40 22 18 under
REFUSE UPLIFT 2 0 2 under
OTHER PROPERTY COSTS 17 20 (3) over
PROPERTY COSTS 2,532 3,306 (774) over
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 2,445 2,738 (293) over
COMPUTER EQUIPMENT MAINTENANCE 3,612 3,522 90 under
I.T. EQUIPMENT MAINT - CONTRACT 647 517 130 under
I.T. ELECTRONIC MESSAGING 131 150 (19) over
EQUIPMENT, APPARATUS AND TOOLS 205 136 69 under
SUPPLIES FOR CLIENTS 233 196 37 under
FURNITURE - OFFICE 0 5 (5) over
MATERIALS 79 101 (22) over
MATERIALS, APPARATUS AND EQUIPMENT 0 5 (5) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 6 5 1 under
FOODSTUFFS - GENERAL 84 156 (72) over
PROTECTIVE CLOTHING & UNIFORMS 7 14 (7) over
OTHER SUPPLIES AND SERVICES 5,459 11,226 (5,767) over
CATERING - OUTWITH CONTRACT 6 0 6 under
OUTSOURCED MAIL 134 137 (3) over
FREE SCHOOL MEALS - COVID 19 0 123 (123) over
SUPPLIES AND SERVICES 13,048 19,031 (5,983) over
TRANSPORT AND PLANT
POOL CAR CHARGES - RENTAL 24 19 5 under
POOL CAR CHARGES - FUEL 5 0 5 under
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 2 1 1 under
FLEET SERVICE CHARGES - LEASING 5 3 2 under
FLEET SERVICE CHARGES - HIRED VEHICLES 0 5 (5) over
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 1 0 1 under
FLEET SERVICE CHARGES - FUEL 2 1 1 under
FLEET SERVICE CHARGES - DRIVERS 37 56 (19) over
HIRE OF EXTERNAL VEHICLES 0 1 (1) over
TRANSPORT AND PLANT 76 86 (10) over

Page 102

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
ADMINISTRATION
PRINTING AND STATIONERY 573 547 26 under
TELEPHONES 1,789 1,573 216 under
MOBILE PHONES 394 642 (248) over
ADVERTISING - RECRUITMENT 18 50 (32) over
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 0
ADVERTISING - OTHER 138 112 26 under
POSTAGES/COURIERS 871 896 (25) over
SMS MESSAGING 0 6 (6) over
MEMBERSHIP FEES/SUBSCRIPTIONS 233 316 (82) over
INSURANCE 139 140 (1) over
MEDICAL COSTS 141 178 (37) over
LEGAL EXPENSES 218 187 31 under
HOSPITALITY / CIVIC RECOGNITION 30 16 14 under
GIRO BANK AGENCY FEES 2 0 2 under
PAYPOINT AGENCY FEES 87 73 14 under
INTERNET AGENCY FEES 0 2 (2) over
SECURITY UPLIFT FEES 6 2 4 under
OTHER ADMIN COSTS 4,535 5,610 (1,075) over
MEMBERS ALLOWANCES 1,762 1,665 97 under
CONFERENCES - MEMBERS (incl associated costs) 9 6 3 under
CONFERENCES - OFFICIALS (incl associated costs) 9 3 6 under
TRAINING 1,117 1,172 (55) over
VOLUNTEERS' EXPENSES 0 3 (3) over
INTERNAL SUPPORT SERVICES ALLOCATION 42 68 (26) over
ADMINISTRATION 12,114 13,267 (1,153) over
PAYMENT TO OTHER BODIES
MANAGEMENT AND TECHNOLOGY TRAINING GRANT 4 4 0
YOUTH EMPLOYMENT TRAINING INITIATIVE 2 2 0
GRANTS TO VOLUNTARY ORGANISATIONS 678 512 166 under
PAYMENTS TO OTHER BODIES 9,817 9,585 232 under
EXTERNAL AUDIT FEES 516 535 (19) over
BUSINESS GRANTS - COVID 19 4,780 4,808 (28) over
PRIVATE INDIVIDUALS - GENERAL 8 114 (106) over
PAYMENT TO OTHER BODIES 15,805 15,560 245 under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 41 56 (15) over
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 231 249 (18) over
PAYMENT TO CONTRACTORS 272 305 (33) over
TRANSFER PAYMENTS
RENT ALLOWANCE 27,581 24,374 3,207 under
RENT REBATES 40,504 41,888 (1,384) over
TRANSFER PAYMENTS 68,085 66,262 1,823 under
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 31 31 0
I.T. EQUIPMENT LEASING-CONTRACT 1,041 993 48 under
FINANCING CHARGES 1,072 1,024 48 under
TOTAL EXPENDITURE 148,580 154,349 (5,769) over

Page 103

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
INCOME
NON RELEVANT GOVERNMENT GRANT (14,163) (14,521) 358 over rec
STATUTORY ADDITIONS - COST OF COLLECTION (740) (682) (58) under rec
RENT REBATES SUBSIDY (37,091) (36,400) (691) under rec
RENT ALLOWANCE SUBSIDY (27,067) (23,978) (3,089) under rec
DWP SUBSIDY (1,138) (1,152) 14 over rec
DHP 0 (1,921) 1,921 over rec
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (120) (149) 29 over rec
CONTRIBUTIONS FROM OTHER BODIES (345) (753) 408 over rec
LOTTERY GRANTS 0 (4) 4 over rec
ESF GRANT (1,345) (1,720) 375 over rec
SALES - GENERAL (90) (1) (89) under rec
SALES - DEPARTMENTS OF THE AUTHORITY (32) (13) (19) under rec
FEES AND CHARGES - GENERAL (4,244) (4,192) (52) under rec
CHARGES TO HEALTH BOARDS (38) (45) 7 over rec
FEES AND CHARGES - OTHER BODIES (245) (209) (36) under rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,810) (2,307) (503) under rec
RENTAL INCOME (2) 0 (2) under rec
HOME LOANS REPAYMENTS (17) (7) (10) under rec
BIRTH REGISTRATION (36) (12) (24) under rec
DEATH REGISTRATION (71) (48) (23) under rec
MARRIAGE STATUTORY FEES (98) (76) (22) under rec
EXTRACT ISSUE (96) (105) 9 over rec
MARRIAGES (75) (55) (20) under rec
CITIZENSHIP CEREMONIES (10) (9) (1) under rec
CIVIL PARTNERSHIPS 0 (1) 1 over rec
COMMITMENT CEREMONIES 0 (1) 1 over rec
NATIONAL CHECKING SERVICE (38) 0 (38) under rec
OTHER INCOME (8,308) (8,225) (83) under rec
REALLOCATION OF CENTRAL SUPPORT COSTS (6,548) (6,594) 46 over rec
REALLOCATION OF SUPPORT COSTS (75) (75) 0
INCOME (104,842) (103,255) (1,587) under rec
NET EXPENDITURE 43,738 51,094 (7,356) over

Page 104

No embedded text on this page.

Page 105

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2022 (No.14)
Housing and Technical Resources
Annual Forecast Annual Annual Actual
Budget for Year Forecast Forecast to Period 14 Variance
BEFORE Variance Variance Budget to 31/03/22 to 31/03/22
Transfers BEFORE AFTER Proportion BEFORE BEFORE
Transfers Transfers to 31/03/22 Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Housing Services 8.896 8.942 (0.046) (0.046) 8.896 8.861 0.035 under
Property Services 8.822 8.487 0.335 0.046 8.822 8.459 0.363 under
COVID-19 0.423 1.441 (1.018) (1.018) 0.423 1.362 (0.939) over
Position before Transfers to Reserves 18.141 18.870 (0.729) (1.018) 18.141 18.682 (0.541) over
Transfers to Reserves as at 31/03/22 0.000 0.398 (0.398) over
Position After Transfers to Reserves at 31/03/22 18.141 19.080 (0.939) over
9

Page 106

Housing and Technical Resources (excl HRA) Variance Analysis 2021/22 (Period 14) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs (120k) over APT&C Basic / Overtime /
Superannuation / National Insurance -
1,216k under
Property Services -
1,262k under 
The variance relates to
vacancies which are actively
being recruited or being held
whilst service requirements are
determined. 
Manual Basic / Overtime /
Superannuation / National Insurance -
(1,375k) over 
Property Services -
(1,340k) over 
The variance reflects the level
of trade operatives and
overtime required to meet
service demands. 
Property Costs (968k) over Rates - (81k) over  COVID-19 - (69k) over  The overspend relates to the
cost for additional temporary
accommodation to meet
increased demand as a result of
COVID-19. 
Rent - (236k) over  Property Services -
(98k) over
The overspend relates to
additional accommodation and
storage unit required to meet
service demands and final
rental costs for office
accommodation unit now
vacated. 
COVID-19 - (115k)
over 
The overspend relates to the
cost for additional temporary
accommodation to meet
increased demand as a result of
COVID-19.

Page 107

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Service Charges - (441k) over COVID-19 - (438k)
over
The overspend relates to
expenditure on Shopping
Centres within the Estates
portfolio due to COVID-19. 
Other Accommodation Costs - (304k)
over 
Housing Services -
(304k) over 
The overspend relates to the
cost for temporary
accommodation to meet current
demand. This has been
managed within the overall
service budget. 
Security Costs - 154k under Property Services -
129k under
The level of security required
varies depending on the
workload demands and timing
of capital and revenue works. 
Repairs and Maintenance - Internal
Contractor / External Contractor -
(114k) over
Housing Services -
(209k) over 
The overspend relates to the
cost of works on temporary
accommodation to meet current
demand. This has been
managed within the overall
service budget. 
Property Services -
100k under
The underspend relates to
lower than anticipated
expenditure within Estates and
has been used to manage
overspends elsewhere in the
budget.

Page 108

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Housing - Rent W/O Unlet Periods -
(249k) over
COVID-19 - (277k)
over 
The overspend relates to the
cost for additional temporary
accommodation to meet
increased demand as a result of
COVID-19. 
Rent W/o Bad Periods - 151k under All Services - 151k
under 
The underspend reflects a
lower than anticipated level of
bad debt provision across the
Resource. 
Fixtures and Fittings - (124k) over Housing Services -
(34k) over
COVID-19 - (88k) over 
The overspend reflects the
current demand for the various
elements of Furnishing
assistance for temporary
accommodation and also
expenditure as a result of
COVID-19. 
Cleaning Contract - (73k) over Property Services -
(68k) over
The level of cleaning required
varies depending on the
workload demands and timing
of capital and revenue works.
The expenditure was higher
than anticipated due to the
volume and level of voids. 
Refuse Uplifts - 360k under Property Services -
360k under
The level of uplifts varies
depending on the workload
demands and timing of capital
and revenue works. The level of
uplifts required was lower due
to COVID-19 lockdown.

Page 109

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services 
3,248k
under
IT Equipment Maint - Contract - 120k
under
Property Services -
114k under 
The cost of the IT systems
within Property Services were
lower than anticipated reflecting
the age of the current system. A
new system is under
development. 
Materials - 3,067k under Property Services -
3,041k under 
Expenditure on materials varies
depending on the workload
demands and timing of works
on a wide variety of capital and
revenue works. These were
lower overall reflecting reduced
work levels due to Covid-19
however, this is partially offset
by increasing prices on
materials. 
Transport and
Plant
593k under Fleet Services Charges (All lines) -
350k under
Property Services -
306k under
The underspend is mainly due
to a reduction in fuel
consumption as a result of
lockdown restrictions on
operatives’ travel. 
Hire of Plant / Scaffolding / Skips -
272k under
Property Services -
272k under 
Expenditure on hires varies
depending on the workload
demands and timing of works
on a wide variety of capital and
revenue works. These were
lower due to COVID-19
lockdown.

Page 110

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies 
428k under Payments to Other Bodies - (158k)
over 
COVID-19 - (224k)
over 
The overspend relates to the
cost for additional temporary
accommodation to meet
increased demand as a result of
COVID-19. 
Assistance to Home Owners - 483k
under 
Property Services -
483k under
This variance reflects a lower
than anticipated demand for
owners grants relating to the
participation in the Housing
Investment projects. The level
of demand has been partially
impacted by COVID-19. 
Payments to
Contractors
5,608k
under
Payments to Private Contractors -
5,849k under
Property Services -
5,673k under
Expenditure on contractor
payments varies depending on
the workload demands and
timing of works on a wide
variety of capital and revenue
works. These are lower due to
COVID-19. 
Housing Services -
176k under
The underspend relates to
commissioned services in the
Homelessness budget where
expenditure varies according to
service requirements. The
underspend offsets expenditure
in property costs.

Page 111

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors (cont) 
Payments to External Consultants -
(237k) over
Property Services -
(236k) over
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet service demands. 
Income (9,162k)
under
recovered
Fees and Charges - General - (100k)
under recovered
Property Services -
(115k) under recovered
This reflects the current level of
income for the Estates portfolio
from service charges. 
Rental Income - (389k) under
recovered 
Property Services -
(396k) under recovered
This reflects the current level of
income for the Estates portfolio
for rental charges.  
House Rents - 424k over recovered  Housing Services - 98k
over recovered
This over recovery relates
mainly to rent from temporary
accommodation stock. 
COVID-19 - 326k over
recovered
The over recovery relates to
income for the provision of
additional temporary
accommodation as a result of
COVID-19. This partially offsets
additional expenditure.

Page 112

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Recovery from Capital / Recharges -
Departments of the Authority -
(9,053k) under recovered 
Property Services -
(9,053k) under
recovered 
The level of income recovered
varies depending on the
workload and the timing of a
wide variety of major capital
projects and is offset by a
reduction in expenditure. These
are lower due to COVID-19. 
The income includes a recharge
to the HRA and capital for fixed
costs of the Project Services. 
* The underlined variances represent new variances since the last report

Page 113

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2020/21 2021/22 TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 14,792 13,914 878 under
APT & C OVERTIME 186 263 (77) over
APT & C SUPERANNUATION 2,864 2,583 281 under
APT & C NIC 1,541 1,407 134 under
MANUAL BASIC 17,731 18,295 (564) over
MANUAL OVERTIME 545 1,167 (622) over
MANUAL SUPERANNUATION 3,413 3,485 (72) over
MANUAL NIC 1,791 1,908 (117) over
TRAVEL AND SUBSISTANCE 28 22 6 under
OTHER EMPLOYEE COSTS 140 111 29 under
PENSION INCREASES 602 594 8 under
ADDITIONAL PENSION COSTS 13 17 (4) over
EMPLOYEE COSTS 43,646 43,766 (120) over
PROPERTY COSTS
RATES 2,126 2,207 (81) over
SCOTTISH WATER - UNMETERED CHARGES 12 15 (3) over
SCOTTISH WATER - METERED CHARGES 241 206 35 under
RENT 1,263 1,499 (236) over
SERVICE CHARGE 141 582 (441) over
FACTORING CHARGES 9 (1) 10 under
OTHER ACCOMMODATION COSTS 2,434 2,738 (304) over
BED AND BREAKFAST 27 3 24 under
PROPERTY INSURANCE 295 285 10 under
SECURITY COSTS 325 171 154 under
GROUND MAINTENANCE 52 61 (9) over
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 7 3 under
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 2,759 2,962 (203) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 0 1 (1) over
LIFE CYCLE MAINTENANCE 3,558 3,558 0 -
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 381 291 90 under
ADAPTIONS - INTERNAL CONTRACTORS 0 25 (25) over
HOUSING - RENT FREE ACCOMMODATION 0 3 (3) over
HOUSING - RENT W/O UNLET PERIODS 679 928 (249) over
HOUSING - RENT W/O BAD PERIODS 817 666 151 under
ASBESTOS 0 8 (8) over
ELECTRICITY  - CONTRACT 995 998 (3) over
ELECTRICITY  - NON CONTRACT 29 7 22 under
GAS 237 244 (7) over
HEATING OIL 12 14 (2) over
FIXTURE & FITTINGS 850 974 (124) over
JANITOR SERVICE 164 152 12 under
CLEANING CONTRACT 355 428 (73) over
CLEANING OUTWITH CONTRACT 0 (3) 3 under
CLEANING MATERIALS 10 5 5 under
WINDOW CLEANING 2 2 0 -
PEST CONTROL 6 8 (2) over
REFUSE UPLIFT 405 45 360 under
REMOVAL & STORAGE COSTS 51 102 (51) over
OTHER PROPERTY COSTS 512 494 18 under
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 1,146 (33) over
ACCOMMODATION RECHARGE TO USERS 33 40 (7) over
PROPERTY COSTS 19,903 20,871 (968) over

Page 114

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2020/21 2021/22 TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 478 472 6 under
COMPUTER EQUIPMENT MAINTENANCE 6 4 2 under
I.T. EQUIPMENT MAINT-CONTRACT 222 102 120 under
EQUIPMENT, APPARATUS AND TOOLS 46 17 29 under
ADAPTATIONS FOR CLIENTS 500 502 (2) over
FURNITURE - OFFICE 0 11 (11) over
FURNITURE - GENERAL 0 7 (7) over
FURNISHINGS 0 9 (9) over
MATERIALS 12,805 9,738 3,067 under
AUDIO VISUAL 10 0 10 under
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 under
TV LICENCES - EDUCATION 1 1 0 -
FOODSTUFFS - GENERAL 2 3 (1) over
PROTECTIVE CLOTHING & UNIFORMS 44 27 17 under
OTHER SUPPLIES AND SERVICES 83 47 36 under
HEALTH AND SAFETY 1 3 (2) over
CATERING - CONTRACT 1 3 (2) over
OUTSOURCED MAIL 0 6 (6) over
DELIVERY CHARGE 0 2 (2) over
BULK BUYING DISCOUNT 0 (1) 1 under
SUPPLIES AND SERVICES 14,201 10,953 3,248 under
TRANSPORT AND PLANT
PURCHASE OF PLANT 125 155 (30) over
FLEET SERVICES - FUEL 0 1 (1) over
POOL CAR RECHARGE - RENTAL CHARGE 100 126 (26) over
POOL CAR RECHARGE - FUEL 26 2 24 under
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 under
TRANSPORT INSURANCE 44 44 0 -
LICENCES 0 2 (2) over
PLANT SERVICES 7 0 7 under
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 328 354 (26) over
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 1 0 -
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 11 (4) over
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 8 7 under
FLEET SERVICE CHARGES LEASING 1,397 1,271 126 under
FLEET SERVICE CHARGES HIRED VEHICLES 201 79 122 under
FLEET SERVICE CHARGES CONTRACT HIRE 48 0 48 under
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 116 175 (59) over
FLEET SERVICE CHARGES FUEL 793 657 136 under
HIRE OF EXTERNAL VEHICLES 0 2 (2) over
HIRE OF EXTERNAL PLANT 257 81 176 under
HIRE OF SCAFOLDING 1,077 674 403 under
HIRE OF SKIPS 33 340 (307) over
TAXI CHARGES - CONTRACTED 10 10 0 -
TRANSPORT AND PLANT 4,586 3,993 593 under
ADMINISTRATION
PRINTING AND STATIONERY 87 77 10 under
BULK PRINTING 0 2 (2) over
TELEPHONES 94 78 16 under
MOBILE PHONES 42 90 (48) over
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 7 6 1 under
ADVERTISING - OTHER 6 0 6 under
POSTAGES/COURIERS 21 51 (30) over
MEMBERSHIP FEES/SUBSCRIPTIONS 12 60 (48) over
INSURANCE 216 210 6 under
MEDICAL COSTS 18 35 (17) over
LEGAL EXPENSES 16 41 (25) over
PETTY OUTLAYS 22 31 (9) over
HOSPITALITY / CIVIC RECOGNITION 2 0 2 under
OTHER ADMIN COSTS 13 9 4 under
TRAINING 0 3 (3) over
INTERNAL SUPPORT SERVICES ALLOCATION 401 401 0 -
CENTRAL ADMINISTRATION 2,645 2,646 (1) over
ADMINISTRATION 3,602 3,740 (138) over

Page 115

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2020/21 2021/22 TO DATE AMOUNT Under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,645 2,566 79 under
PAYMENTS TO OTHER BODIES 1,207 1,365 (158) over
SUPPORTING PEOPLE INTERNAL PROVIDER 1,201 1,212 (11) over
SUPPORTING PEOPLE EXTERNAL PROVIDER 604 568 36 under
HOUSING ADMINISTRATION 1,170 1,170 0 -
ASSISTANCE TO HOME OWNERS 1,860 1,377 483 under
PRIVATE INDIVIDUALS - GENERAL 573 574 (1) over
PAYMENT TO OTHER BODIES 9,260 8,832 428 under
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 0 3 (3) over
PAYMENT TO PRIVATE CONTRACTOR 18,358 12,509 5,849 under
PAYMENT TO INTERNAL CONSULTANTS 0 1 (1) over
PAYMENT TO EXTERNAL CONSULTANTS 231 468 (237) over
PAYMENT TO CONTRACTORS 18,589 12,981 5,608 under
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 153 185 (32) over
INTEREST ON REVENUE BALANCES 2 0 2 under
FINANCING CHARGES 155 185 (30) over
TOTAL EXPENDITURE 113,942 105,321 8,621 under
INCOME
CONTRIBUTIONS FROM OTHER BODIES (436) (480) 44 over rec
SALES - DEPARTMENTS OF THE AUTHORITY (460) (416) (44) under rec
FEES AND CHARGES - GENERAL (580) (480) (100) under rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (48) (46) (2) under rec
RENTAL INCOME (4,940) (4,551) (389) under rec
HOUSE RENTS (5,249) (5,673) 424 over rec
OTHER INCOME (3,391) (3,381) (10) under rec
REALLOCATION OF CENTRAL SUPPORT COSTS (769) (769) 0 -
REALLOCATION OF SUPPORT COSTS (2,240) (2,208) (32) under rec
RECOVERY FROM CAPITAL (39,747) (29,030) (10,717) under rec
RECHARGES - DEPARTMENTS OF THE AUTHORITY (37,842) (39,506) 1,664 over rec
MANUAL RECHARGES - DEPARTMENTS OF THE AUTHORITY (99) (99) 0 -
INCOME (95,801) (86,639) (9,162) under rec
NET EXPENDITURE 18,141 18,682 (541) over

Page 116

No embedded text on this page.

Page 117

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2021/22 (Period 14) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 133k under APT&C - Basic / Overtime /
Superannuation / National Insurance -
156k under 
HRA The variance relates to
vacancies, which are being
actively recruited or being held
whilst service requirements are
determined. 
Property Costs (832k) over Other Accommodation Costs - (67k)
over
HRA This overspend relates rent
costs associated with Lindsay
House and is offset by an over
recovery of income. 
Security Costs - 52k under  HRA This is a demand led budget
and demand for the security of
empty properties was lower
than anticipated. 
Grounds Maintenance - (330k) over HRA The overspend reflects the
increased demand for special
uplifts / special requests this
year. 
9

Page 118

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Repairs and Maintenance - Internal
and External Contractor - (2,207k)
over 
HRA The net overspend reflects a
reduction in repairs and
maintenance during the various
periods of lockdown throughout
the year, offset by an increase
in demand when restrictions
eased and for the level of void
work required. The position
includes the agreed recharge
for downtime during the
COVID-19 lockdown. 
Housing - Rent Free Accommodation
- (79k) over 
HRA The overspend reflects the
volume of discretionary rent
periods awarded during the
year, which is demand led. 
Housing - Rent W/O Unlet Periods -
(282k) over  
HRA This budget is demand led and
the overspend reflects the
current pressure in void
properties. 
Rent W/o Bad Periods - 2,209k under HRA This underspend reflects a
lower than anticipated level of
bad debt provision. During the
year collection rates for rental
income have been better than
forecast, which is due in part to
schemes such as the tenancy
sustainment fund mitigating the
overall level of debt.

Page 119

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Electricity / Gas / Heating Oil / Solid
Fuel - 149k under 
HRA The underspend reflects the
current demand and price. The
anticipated increase in prices
due to inflation occurred later
than anticipated. 
Fixture and Fittings - (99k) over HRA This budget is demand led and
the overspend reflects the
increased demand during the
year. 
Cleaning Contract - (73k) over HRA This overspend is due to
inflationary price increases. 
Pest Control - (93k) over HRA The overspend reflects an
increase in demand for this
service during the year. 
Supplies and
Services 
178k under Computer Equipment Purchase -
265k under 
HRA This underspend reflects a
change to the timing of the new
IT system under development.
This has been carried forward
into future years to complete
the project. 
Administration
Costs
160k under Legal Expenses - 60k under HRA This budget is demand led and
the underspend reflects the
lower than anticipated levels of
eviction actions during the year.

Page 120

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs (cont) 
Internal Support Services Allocation -
64k under
HRA This reflects a reduction in the
recharge from the Council’s 
support departments. 
Financing Charges 8k under Interest - Debt Charges - 115k under HRA The overall level of debt charge
was lower than anticipated due
to the profile of funding
requirements. 
I.T. Equipment Leasing - Contract -
(58k) over
HRA The overspend reflects
changing demands post Covid-
19 and the budget requires to
be realigned in the new
financial year to reflect this. 
Interest On Revenue Balances - (49k)
over
HRA The level of interest received
reflects the level of balances
and interest rates being lower
than anticipated. 
Income 334k over
recovered
Fees And Charges - General - 863k
over recovered
HRA This over recovery is due to an
increased level of rechargeable
repairs and also one-off work
carried out on behalf of owner
occupiers. 
House Rents - 540k over recovered  HRA  The over recovery is due to the
timing of new builds which
completed ahead of the
anticipated profiles.

Page 121

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Insurance Recoveries - 254k over
recovered 
HRA This over recovery reflects an
increase in the level of
insurable repairs carried out
which are demand led. 
Other Income - 494k over recovered HRA This over recovery of income
reflects additional funding
received mainly to offset
employee costs. 
Year End Transfer to the Balance
Sheet - (1,946k) under recovered 
HRA  The budget assumes a level of
transfer to reserves, however,
due to the current net
underspend across the service
the level of transfer is higher
than anticipated. 
* The underlined variances represent new variances since the last report.

Page 122

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2020/21 2020/21 TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 10,811 10,644 167 under
APT & C OVERTIME 79 141 (62) over
APT & C SUPERANNUATION 1,919 1,943 (24) over
APT & C NIC 1,023 948 75 under
TRAVEL AND SUBSISTANCE 39 5 34 under
OTHER EMPLOYEE COSTS 0 55 (55) over
PENSION INCREASES 219 215 4 under
ADDITIONAL PENSION COSTS 0 6 (6) over
EMPLOYEE COSTS 14,090 13,957 133 under
PROPERTY COSTS
RATES 77 35 42 under
SCOTTISH WATER - UNMETERED CHARGES 4 7 (3) over
SCOTTISH WATER - METERED CHARGES 8 10 (2) over
RENT 6 0 6 under
SERVICE CHARGE 65 97 (32) over
OTHER ACCOMMODATION COSTS 31 98 (67) over
BED AND BREAKFAST 0 4 (4) over
PROPERTY INSURANCE 923 924 (1) over
SECURITY COSTS 55 3 52 under
GROUND MAINTENANCE 4,257 4,580 (323) over
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 7 (7) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 30,335 31,436 (1,101) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 1,983 (1,106) over
HOUSING - RENT FREE ACCOMMODATION 155 234 (79) over
SOLID FUEL HEATING MAINTENANCE 0 4 (4) over
HOUSING - RENT W/O UNLET PERIODS 2,293 2,575 (282) over
HOUSING - RENT W/O BAD PERIODS 4,822 2,613 2,209 under
ASBESTOS 139 139 0 -
FIXED ELECTRICAL 0 1 (1) over
EPC 0 2 (2) over
ELECTRICITY  - CONTRACT 917 855 62 under
ELECTRICITY  - NON CONTRACT 0 2 (2) over
GAS 301 239 62 under
HEATING OIL 54 30 24 under
SOLID FUEL 4 1 3 under
FIXTURE & FITTINGS 58 157 (99) over
JANITOR SERVICE 29 30 (1) over
CLEANING CONTRACT 386 459 (73) over
CLEANING MATERIALS 60 29 31 under
HEALTH & HYGIENE MATERIALS 0 1 (1) over
WINDOW CLEANING 16 18 (2) over
PEST CONTROL 122 215 (93) over
REFUSE UPLIFT 4 37 (33) over
REMOVAL & STORAGE COSTS 14 19 (5) over
OTHER PROPERTY COSTS 49 49 0 -
PROPERTY COSTS 46,061 46,893 (832) over
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 566 301 265 under
I.T. EQUIPMENT MAINT-CONTRACT 209 203 6 under
EQUIPMENT, APPARATUS AND TOOLS 13 13 0 -
ADAPTATIONS FOR CLIENTS 0 25 (25) over
SUPPLIES FOR CLIENTS 0 1 (1) over
FURNITURE - OFFICE 10 6 4 under
FURNITURE - GENERAL 0 30 (30) over
MATERIALS 0 29 (29) over
MATERIALS, APPARATUS AND EQUIPMENT 0 2 (2) over
AUDIO VISUAL 0 6 (6) over
FOODSTUFFS - GENERAL 6 8 (2) over
PROTECTIVE CLOTHING & UNIFORMS 12 8 4 under
LAUNDRY COSTS 16 5 11 under
OTHER SUPPLIES AND SERVICES 32 26 6 under
HEALTH AND SAFETY 15 0 15 under
CATERING - OUTWITH CONTRACT 0 1 (1) over
OUTSOURCED MAIL 0 37 (37) over
SUPPLIES AND SERVICES 879 701 178 under

Page 123

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2020/21 2020/21 TO DATE AMOUNT Under
TRANSPORT AND PLANT
POOL CAR RECHARGE - RENTAL CHARGE 26 40 (14) over
POOL CAR RECHARGE - FUEL 6 0 6 under
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 under
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 23 18 5 under
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 1 under
FLEET SERVICE CHARGES ASSET MODIFICATIONS 0 3 (3) over
FLEET SERVICE CHARGES LEASING 71 68 3 under
FLEET SERVICE CHARGES HIRED VEHICLES 34 0 34 under
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 8 10 (2) over
FLEET SERVICE CHARGES FUEL 21 13 8 under
STORAGE 4 0 4 under
TAXI CHARGES - CONTRACTED 0 1 (1) over
TRANSPORT AND PLANT 195 153 42 under
ADMINISTRATION
PRINTING AND STATIONERY 61 40 21 under
BULK PRINTING 53 21 32 under
TELEPHONES 84 90 (6) over
MOBILE PHONES 27 56 (29) over
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 1 under
ADVERTISING - OTHER 2 1 1 under
POSTAGES/COURIERS 132 133 (1) over
SMS MESSAGING 0 2 (2) over
MEMBERSHIP FEES/SUBSCRIPTIONS 38 38 0 -
MEDICAL COSTS 25 26 (1) over
LEGAL EXPENSES 61 1 60 under
PETTY OUTLAYS 4 3 1 under
GIRO BANK AGENCY FEES 9 0 9 under
PAYPOINT AGENCY FEES 49 37 12 under
INTERNET AGENCY FEES 6 0 6 under
OTHER ADMIN COSTS 12 24 (12) over
CONFERENCES - OFFICIALS 7 1 6 under
TRAINING 0 2 (2) over
INTERNAL SUPPORT SERVICES ALLOCATION 5,074 5,010 64 under
ADMINISTRATION 5,645 5,485 160 under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,910 2,906 4 under
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 3 under
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 65 (34) over
PAYMENTS TO OTHER BODIES 32 55 (23) over
PRIVATE INDIVIDUALS - GENERAL 100 104 (4) over
PAYMENT TO OTHER BODIES 3,076 3,130 (54) over
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 80 54 26 under
PAYMENT TO EXTERNAL CONSULTANTS 20 15 5 under
PAYMENT TO CONTRACTORS 100 69 31 under
FINANCING CHARGES
INTEREST-DEBT CHARGES 15,831 15,716 115 under
I.T. EQUIPMENT LEASING-CONTRACT 67 125 (58) over
CFCR 19,637 19,637 0 -
INTEREST ON REVENUE BALANCES (67) (18) (49) over
FINANCING CHARGES 35,468 35,460 8 under
TOTAL EXPENDITURE 105,514 105,848 (334) over

Page 124

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2020/21 2020/21 TO DATE AMOUNT Under
INCOME
CONTRIBUTIONS FROM OTHER BODIES 0 (19) 19 over rec
SALES - DEPARTMENTS OF THE AUTHORITY (1,169) (1,170) 1 over rec
FEES AND CHARGES - GENERAL (2,663) (3,526) 863 over rec
RENTAL INCOME (460) (505) 45 over rec
HOUSE RENTS (96,988) (97,528) 540 over rec
LOCK UP RENTS (2,533) (2,530) (3) under rec
COMMISSION 0 (21) 21 over rec
INSURANCE RECOVERIES (250) (504) 254 over rec
OTHER INCOME (1,705) (2,297) 494 over rec
REALLOCATION OF SUPPORT COSTS (717) (619) 0 -
TMC BALANCE TO BAL SHEET 0 (46) 46 over rec
YEAR END T/FER TO BALANCE SHEET 971 2,917 (1,946) under rec
INCOME (105,514) (105,848) 334 over rec
NET EXPENDITURE 0 0 0 -

Page 125

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2022 (No.14)
Social Work Resources
Annual Forecast Annual Annual Actual
Budget for Year Forecast Forecast to Period 14 Variance
BEFORE Variance Variance Budget to 31/03/22 to 31/03/22
Transfers BEFORE AFTER Proportion BEFORE BEFORE
Transfers Transfers to 31/03/22 Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Performance and Support 8.113 7.709 0.404 0.404 8.113 7.636 0.477 under
Children and Families 35.228 36.237 (1.009) (1.009) 35.228 36.145 (0.917) over
Adults and Older People 141.369 141.339 0.030 0.030 141.369 139.287 2.082 under
Justice and Substance Misuse 1.662 1.692 (0.030) (0.030) 1.662 1.647 0.015 under
COVID-19 0.000 2.542 (2.542) (2.542) 0.000 2.573 (2.573) over
Position before Transfers to Reserves 186.372 189.519 (3.147) (3.147) 186.372 187.288 (0.916) over
Transfers to Reserves as at 31/03/22 0.000 2.051 (2.051) over
Position After Transfers to Reserves at 31/03/22 186.372 189.339 (2.967) over
9

Page 126

Social Work Resources Variance Analysis 2021/22 (Period 14) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs (3,849k)
over
Admin and Clerical Staff - (1,631k) over Performance and
Support - 281k under 
The underspends is a result of
vacancies which are actively
being recruited. 
COVID-19 - (1,978k)
over 
This overspend relates to the
£500 thank you payment made to
all eligible social care staff and is
offset by the over recovery of
income.  
Managerial Support Specialist - (365k)
over 
Performance and
Support - 114k under
Children and Families -
291k under 
This is a result of vacancies
which are actively being
recruited. 
Adults and Older People
- (490k) over 
The overspend is a result of
turnover being less than
anticipated and also additional
posts to meet service
improvements within Home Care. 
Justice - 60k under  This is a result of vacancies
which are actively being
recruited. 
COVID-19 - (340k) over  This overspend is in relation to
staff working additional hours
during COVID.

Page 127

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont) 
Basic Grade Social Workers – 1,017k
under 
Children and Families -
233k under
Adults and Older People
- 721k under
Justice - 76k under 
This is a result of vacancies
which are actively being
recruited. 
Instructors – 379k under  Adults and Older People
- 395k under 
This underspend relates to 
vacancies as a consequence of
building based day services
currently not being fully
operational during the COVID-19
pandemic 
Care Staff - (1,692k) over  Adults and Older People
- 512k under
The underspend is a due to a
combination of vacancies within
residential care and also a non-
recurring underspend as a result
of the timing between the
decommissioning of existing
residential facilities and the
opening of the new replacement
facility. 
COVID-19 - (2,199k)
over
These costs relate to the
response to COVID-19 to 
maintain existing service delivery
and to support hospital
discharge.

Page 128

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont) 
Home Carers - (1,620k) over  Adults and Older People
- (554k) over 
This overspend is due to the new
Senior Carers posts within the
Home Care Service and also the
requirement to work overtime to
meet service needs. 
COVID-19 - (1,066k)  These costs relate to additional
staffing costs in the response to
COVID-19 to maintain existing
service delivery. 
Other Employee Costs - 71k under  Adults and Older People
- (101k) over 
This overspend relates to medical
charges, physiotherapy and
overtime. 
Justice - 143k under  This related to non-recurring
funding to support the pandemic
recovery, where some services
were purchased from the 3rd
sector rather than recruit staff on
a short term basis. This is offset
by the overspend on Payment to
Voluntary Organisations. 
Property Costs  (354k) over  Repairs and Maintenance - Internal
Contractor - (341k) over 
COVID-19 - (328k) over  This reflects the cost of operating
the Personal Protective
Equipment (PPE) hub and the
deliveries of PPE to all care
providers in South Lanarkshire.

Page 129

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Gas - 112k under  Adults and Older People
- 89k under 
The underspend reflects the
reduction in consumption due to
the closure of adult and older day
care facilities. 
Health and Hygiene Materials - (199k)
over 
COVID-19 - (154k) over  This is a result of additional
cleaning materials required as a
result of COVID-19 in order to
meet infection prevention and
control measures. 
Supplies and
Services 
(1,407k)
over
Computer Equipment Purchase - (414k)
over
Performance and
Support - (101k) over 
This overspend reflects Social
Work’s share of the costs
associated with the Council’s
computerised EDRMS filing
system as well as the increased
demand for IT equipment due to
mobile and home working. 
Adults and Older People
- (254k) over 
The overspend relates to the
costs associated with the
implementation of the new home
care scheduling system. 
Aids and Adaptations - (1,202k) over  COVID-19 - (1,226k)
over 
This overspend relates to the
additional demand for
adaptations as services are re-
mobilised.

Page 130

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont) 
Supplies for Clients - 102k under  Children and Families -
84k under 
This is a demand led line and
expenditure has been lower than
anticipated due to COVID-19. 
Food Purchases Within Contract
Service - 73k under
Adults and Older People
- 190k under
There is an underspend as a
consequence of building based
day services currently not being
fully operational during the
COVID-19 pandemic 
COVID-19 - (106k) over This expenditure is due to the
provision of a meal service during
the COVID-19 pandemic.   
Transport and
Plant
28k under Pool Car Charges - Rental - (80k) over Children and Families -
(40k) over
Adults and Older People
- (40k) over 
This is the costs associated with
staff travelling separately due to
COVID-19 in accordance with
social distancing guidance. 
Other Transport Costs - 194k under  Children and Families -
65k under 
This reflects the commitments in
respect of transporting children to
and from school or respite, which
has not yet returned to pre covid
pandemic levels.   
Adults and Older People
- 138k under 
There is an underspend as a
consequence of building based
day services currently not being
fully operational during the
COVID-19 pandemic

Page 131

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont) 
Fleet Service Charges - Leasing - (70k)
over
COVID-19 - (73k) over  This is the costs associated with
staff travelling separately due to
COVID-19 in accordance with
social distancing guidance. 
Administration
Costs
77k under Printing and Stationery - 59k under  Performance and
Support - 63k under 
Due to an increase in mobile and
home working, there has been
less demand for printing and
stationery. 
Payment to Other
Bodies
(1,724k)
over
Payments to Voluntary Organisations -
68k under
Children and Families -
264k under 
This is non-recurring underspend
in relation to funding to develop
both Supported Accommodation
and young carers.   
Adults and Older People
- 116k under 
This underspend relates to timing
of expenditure in relation to the
Carers Act.   
Justice - (120k) over  Due to non-recurring funding to
support the pandemic recovery,
services were purchased from
the 3rd sector instead of directly
employing staff.  This is offset by
and underspend on Other
Employee Costs. 
COVID-19 - (192k) over  This expenditure relates to
additional support to Carers
during COVID-19.

Page 132

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to Other
Bodies (cont) 
Payment to Other Bodies - (604k) over Children and Families -
369k under 
This is a non-recurring
underspend arising from the
timing of recruitment to funded
posts.   
Adults and Older People
- 132k under 
This is a non-recurring
underspend arising from the
timing of recruitment to funded
posts.   
Justice - (127k) over  This is in relation to costs for
delivery of the Whole System
Approach which has been
managed within the total Section
27 Justice funding from the
Scottish Government. 
COVID 19 - (999k) over  This is the staffing and venue
costs of operating the COVID
Vaccination centres and is offset
by Scottish Government funding. 
Private Individuals - General - 214k
under 
Children and Families -
230k under 
This reflects the current demand
for Supported Carers and the
Short Breaks Service. 
Social Work - Foster Parents - (700k)
over 
Children and Families -
(461k) over 
This overspend is the result of
the continuing use of external
foster placements arising from
permanent fostering placements
for children and young people.

Page 133

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to Other
Bodies (cont) 
Social Work - Foster Parents (cont)  COVID-19 - (239k) over  These costs are in respect of
additional costs for solo
placements to meet the child’s
needs. 
Adoption Allowances - (167k) over COVID-19 - (132k) over  This expenditure is in relation to
the fee paid to external
organisations for the matching of
a child to an external permanent
adoption placement. 
Direct Payments - (573k) over  COVID-19 - (615k) over  This is the costs of additional
support required being paid direct
to service users. 
Payments to
Contractors
(10,468k)
over
Payments to Contractors - (115k) over  Adults and Older People
- (224k) over 
The overspend is due a delay in
the implementation of the
2021/2022 savings due to
COVID-19 and has been
managed within the overall
budget. 
Justice - 79k under  This underspend occurred as a
result of timing in relation to a Big
Lottery project, offset an under
recovery of income

Page 134

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors (cont) 
Long Term Care - (5,211k) over  Children and Families -
(1,320k) over 
This overspend is a result of the
increased requirement for
children’s residential external
school placements. 
COVID-19 - (3,836k)
over 
This expenditure mainly relates to
interim care home placements to
create capacity in the hospital
and facilitate discharge during the
COVID-19 pandemic and
external placements for young
people resulting from the
breakdown of existing care
arrangements within the
community as a result of the
pandemic. 
Home Care - 495k under  Adults and Older People
- 731k under 
The underspend has arisen as a
result of the availability of
external providers to deliver
service. 
COVID-19 - (234k) over  This cost is in relation to
initiatives to prevent delays in
discharges from hospital 
Respite - 260k under  Children and Families -
(47k) over
COVID-19 - (100k) over 
This overspend relates to
additional respite provided to
support families.

Page 135

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors (cont) 
Respite (cont) Adults and Older People
- 407k under 
The underspend is partially
related to care homes ability to
accept admissions during covid. 
Daycare - (224k) over  Adults and Older People
- (224k) over 
The overspend has arisen over
several areas. This overspend
partially offsets the underspend
within Day Related Activities. 
Home Support - (826k) over  Adults and Older People
- (238k) over
COVID-19 - (588k) over 
These costs relate to additional
demand as services are re-
mobilised. 
Free Personal Care - 178k under  Adults and Older People
-178k under 
The requirement for free personal
care payments is subject to a
financial assessment and the
level of payments required is
lower than anticipated. 
Day Related Activities incl Residential
Placements - (5,008) over 
Adults and Older People
- 396k under 
This underspend reflects the
reduction in demand for day
related activities and is partially
offset by an overspend in day
care. 
COVID-19 - (5,406k)
over 
This represents the additional
costs incurred by external
providers in their response to
COVID. It consists of additional
staffing, PPE costs, and
sustainability payments including
under occupancy in care homes.

Page 136

Subjective Head Variance  Subjective line Service / amount Explanation
Transfer Payments  (572k) over  Direct Assistance to Persons - (603k)
over 
Children and Families -
(542k) over 
This overspend relates to
demand for kinship care
payments. 
Income 17,436k
over
recovered
Non-Relevant Government Grant -
1,907k over recovered 
Adults and Older People
- (129k) under recovered 
This under recovery of income is
offset by an underspend in
Hospital Social Workers in
Employee Costs. 
COVID-19 - 2,016k over
recovered
This over recovery of income
relates to the funding received
from the Scottish Government in
respect of the £500 thank you
payment made to all eligible
social care staff and is offset by
expenditure in Employee Costs. 
Resource Transfer Income - (176k)
under recovered 
Adults and Older People
- (176k) under recovered 
The under recovery is due to a
funding which has not yet been
confirmed. 
Contribution from Other Bodies - (139k)
under 
Justice - (134k) under
recovered
The under recovery has arisen
from carrying forward Big Lottery
funding received that was not
utilised during the year. This is
offset by an underspend in
expenditure.

Page 137

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Fees and Charges - General - (1,492k)
under recovered 
Adults and Older People
- (1,496k) under
recovered 
In responding to COVID-19, day
care services and services in the
community were suspended.
Service user charges have been
adjusted to reflect the services
being delivered, resulting in an
under recovery of income. 
Fees and Charges - Other Local
Authorities - (432k) under recovered 
Adults and Older People
- (330k) under recovered 
In responding to COVID-19,
building based day care services
were suspended. As a result
there is a loss of income from
other local authorities who place
their service users in South
Lanarkshire facilities. 
Justice - (101k) under
recovered
The under recovery is a result of
a reduction in funding available. 
Budgets will be realigned in the
new financial year. 
Charges to Health Boards - 17,746k
over recovered 
Adults and Older People
- 2,104k over recovered 
This over recovery reflects
funding for the loss of income
and slippage in the achievement
of savings as a result of the
response to COVID-19.

Page 138

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Charges to Health Boards (cont)  COVID-19 - 15,702k
over recovered 
This over recovery of income is in
relation to funding received from
the Scottish Government via the
Health and Social Care
partnership and offsets the
expenditure incurred in the
mobilisation plan in response to
COVID-19. 
Other Income - 84k over recovered  Children and Families -
105k over recovered 
This is in relation to the recovery
of costs from the Home Office for
services provided to asylum-
seeking children in South
Lanarkshire children’s care
facilities. 
Adults and Older People
- (56k) under recovered 
Monies are recovered based on
expenditure incurred.  The under
recovery is offset by an
underspend in expenditure. 
* The underlined variances represent new variances since the last report.

Page 139

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
ADMIN & CLERICAL STAFF - APT&C BASIC 4,904 6,331 (1,428) over
ADMIN & CLERICAL STAFF - APT&C OVERTIME 24 32 (8) over
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 858 848 10 under
ADMIN & CLERICAL STAFF - APT&C NIC 333 538 (205) over
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 19,158 18,917 241 under
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 49 557 (508) over
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 3,446 3,463 (17) over
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 1,925 2,006 (81) over
BASIC GRADE SOCIAL WORKERS BASIC 11,596 10,713 883 under
BASIC GRADE SOCIAL WORKERS OVERTIME 26 49 (23) over
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 2,073 1,979 94 under
BASIC GRADE SOCIAL WORKERS NIC 1,183 1,120 63 under
HOSPITAL SOCIAL WORKERS BASIC 403 384 19 under
HOSPITAL SOCIAL WORKERS OVERTIME 0 20 (20) over
HOSPITAL SOCIAL WORKERS SUPERANNUATION 76 71 5 under
HOSPITAL SOCIAL WORKERS NIC 41 43 (2) over
INSTRUCTORS BASIC 1,490 1,185 305 under
INSTRUCTORS OVERTIME 0 1 (1) over
INSTRUCTORS SUPERANNUATION 260 216 44 under
INSTRUCTORS NIC 128 97 31 under
CARE STAFF - APT&C BASIC 17,294 18,083 (789) over
CARE STAFF - APT&C OVERTIME 634 1,103 (469) over
CARE STAFF - APT&C SUPERANNUATION 3,036 3,253 (217) over
CARE STAFF - APT&C NIC 1,454 1,671 (217) over
HOME CARERS BASIC 18,462 19,434 (972) over
HOME CARERS OVERTIME 1,210 1,639 (429) over
HOME CARERS SUPERANNUATION 3,311 3,422 (111) over
HOME CARERS NIC 1,574 1,682 (108) over
TRAVEL AND SUBSISTENCE 368 342 26 under
OTHER EMPLOYEE COSTS 4,878 4,807 71 under
PENSION INCREASES 325 292 33 under
ADDITIONAL PENSION COSTS 0 69 (69) over
EMPLOYEE COSTS 100,519 104,367 (3,849) over
PROPERTY COSTS
RATES 416 343 73 under
SCOTTISH WATER - UNMETERED CHARGES 41 39 2 under
SCOTTISH WATER - METERED CHARGES 162 130 32 under
RENT 446 437 9 under
SERVICE CHARGE 0 9 (9) over
PROPERTY INSURANCE 31 32 (1) over
SECURITY COSTS 52 61 (9) over
GROUND MAINTENANCE 3 1 2 under
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 9 350 (341) over
REPAIRS & MAINTENANCE - INT. CONTRACTOR 0 1 (1) over
LIFE CYCLE MAINTENANCE 0 1 (1) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 35 23 12 under
ADAPTIONS - INTERNAL CONTRACTORS 0 1 (1) over
SOLID FUEL HEATING MAINTENANCE 0 5 (5) over
ELECTRICITY  - CONTRACT 477 453 24 under
GAS 360 249 112 under
FIXTURE & FITTINGS 0 2 (2) over
JANITOR SERVICE 36 36 0
CLEANING CONTRACT 275 366 (91) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 107 103 4 under
HEALTH & HYGIENE MATERIALS 3 202 (199) over
WINDOW CLEANING 12 6 7 under
PEST CONTROL 1 0 1 under
REFUSE UPLIFT 35 31 4 under
REMOVAL & STORAGE COSTS 1 2 (1) over
OTHER PROPERTY COSTS 65 40 25 under
PROPERTY COSTS 2,567 2,923 (354) over

Page 140

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 475 890 (414) over
COMPUTER EQUIPMENT MAINTENANCE 96 63 33 under
I.T. EQUIPMENT MAINT-CONTRACT 193 233 (40) over
I.T. ELECTRONIC MESSAGING 246 292 (46) over
EQUIPMENT, APPARATUS AND TOOLS 162 112 50 under
SMALL TOOLS 2 6 (4) over
AIDS & ADAPTIONS 2,226 3,428 (1,202) over
SUPPLIES FOR CLIENTS 398 296 102 under
FURNITURE - OFFICE 0 17 (17) over
FURNITURE - GENERAL 1 11 (10) over
FURNISHINGS (INCL. CROCKERY & LINEN) 32 22 10 under
MATERIALS 18 9 9 under
MATERIALS, APPARATUS AND EQUIPMENT 0 12 (12) over
LIBRARY/RESOURCE CENTREMATERIALS 0 1 (1) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC 0 1 (1) over
TV LICENCES - EDUCATION 0 3 (3) over
PROVISIONS - GENERAL 160 216 (56) over
FOOD PURCHASES WITHIN CONTRACT SERVICE 554 481 73 under
BEVERAGES 47 42 5 under
SCHOOL MILK 52 27 25 under
PROTECTIVE CLOTHING & UNIFORMS 213 183 30 under
LAUNDRY COSTS 17 27 (10) over
OTHER SUPPLIES AND SERVICES 48 33 15 under
HEALTH AND SAFETY 0 3 (3) over
CATERING - CONTRACT 316 298 18 under
CATERING - OUTWITH CONTRACT 54 11 43 under
I- PROCUREMENT ERRORS 0 1 (1) over
SUPPLIES AND SERVICES 5,310 6,718 (1,407) over
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 125 205 (80) over
POOL CAR CHARGES-FUEL 43 63 (20) over
POOL CAR CHARGES-ADDITIONAL COSTS 8 4 4 under
OTHER TRANSPORT COSTS 807 613 194 under
INSURANCE 24 21 3 under
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 69 106 (37) over
FLEET SERVICE CHARGES - ASSET MODIFICATIONS 0 2 (2) over
FLEET SERVICE CHARGES - LEASING 404 474 (70) over
FLEET SERVICE CHARGES - HIRED VEHICLES 24 23 1 under
FLEET SERVICE CHARGES - CONTRACT HIRE 7 0 7 under
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 28 54 (26) over
FLEET SERVICE CHARGES - FUEL 255 238 17 under
FLEET SERVICE CHARGES - DRIVERS 2,745 2,706 39 under
HIRE OF EXTERNAL VEHICLES 2 0 2 under
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 0 1 (1) over
PUPIL TRANSPORT - OTHER 0 2 (2) over
TRANSPORT AND PLANT 4,541 4,512 29 under
ADMINISTRATION
PRINTING AND STATIONERY 169 110 59 under
TELEPHONES 213 202 11 under
MOBILE PHONES 304 412 (108) over
ADVERTISING - RECRUITMENT 4 6 (2) over
ADVERTISING - OTHER 32 1 31 under
POSTAGES/COURIERS 98 66 32 under
MEMBERSHIP FEES/SUBSCRIPTIONS 54 71 (17) over
INSURANCE 70 70 0
MEDICAL COSTS 27 54 (27) over
LEGAL EXPENSES 268 214 54 under
HOSPITALITY / CIVIC RECOGNITION 1 1 0
SECURITY UPLIFT FEES 0 0 0
OTHER ADMIN COSTS 41 19 22 under
CONFERENCES - OFFICIALS (incl associated costs) 11 2 8 under
TRAINING 27 12 14 under
INTERNAL SUPPORT SERVICES ALLOCATION 400 400 0
ADMINISTRATION 1,719 1,640 77 under

Page 141

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 14 PERIOD 14
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2021/2022 SLC 21/22 2 TO DATE AMOUNT Under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 332 307 25 under
OTHER LOCAL AUTHORITIES 35 24 11 under
GRANTS TO VOLUNTARY ORGANISATIONS 23 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 3,825 3,757 68 under
PAYMENTS TO OTHER BODIES 4,288 4,892 (604) over
INDEPENDENT SCHOOL PLACES 0 9 (9) over
PRIVATE INDIVIDUALS - GENERAL 923 708 214 under
SOCIAL WORK - FOSTER PARENTS 5,482 6,182 (700) over
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 83 11 under
SOCIAL WORK - ADOPTION ALLOWANCES 650 817 (167) over
DIRECT PAYMENTS 7,932 8,505 (573) over
PAYMENT TO OTHER BODIES 23,584 25,307 (1,724) over
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR - DEFAULT 987 1,102 (115) over
PAYMENT TO PRIVATE CONTRACTOR - LONG TERM CARE 50,687 55,898 (5,211) over
PAYMENT TO PRIVATE CONTRACTOR - CET ALLOCATION - HOME CARE 27,451 26,956 495 under
PAYMENT TO PRIVATE CONTRACTOR - RESPITE 2,296 2,036 260 under
PAYMENT TO PRIVATE CONTRACTOR - SUPPORTING PEOPLE COSTS 0 (3) 3 under
PAYMENT TO PRIVATE CONTRACTOR - DAY CARE 1,125 1,349 (224) over
PAYMENT TO PRIVATE CONTRACTOR - HOME SUPPORT 18,936 19,762 (826) over
PAYMENT TO PRIVATE CONTRACTOR - FREE PERSONAL NURSING CARE 6,191 6,013 178 under
PAYMENT TO PRIVATE CONTRACTOR - RESPITE AWAIT' LONG TERM CARE 0 (20) 20 under
PAYMENT TO PRIVATE CONTRACTOR - DAY RELATED ACTIVITIES INCL RESIDENTIAL PLACEMENTS 4,753 9,761 (5,008) over
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 35 69 (34) over
SLC MANAGED 0 6 (6) over
PAYMENT TO CONTRACTORS 112,461 122,929 (10,468) over
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 3,043 3,646 (603) over
SECTION PAYMENTS 82 52 31 under
TRANSFER PAYMENTS 3,125 3,698 (572) over
FINANCING CHARGES
LEASING CHARGES - FINANCE 2 0 2 under
LEASING CHARGES - OPERATIONAL 0 30 (30) over
I.T. EQUIPMENT LEASING-CONTRACT 335 391 (56) over
FINANCING CHARGES 337 421 (84) over
TOTAL EXPENDITURE 254,163 272,515 (18,352) over
INCOME
NON RELEVANT GOVERNMENT GRANT (8,619) (10,526) 1,907 over rec
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (24,108) (23,932) (176) under rec
CONTRIBUTIONS FROM OTHER BODIES (766) (627) (139) under rec
FEES AND CHARGES - GENERAL (6,002) (4,510) (1,492) under rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,002) (570) (432) under rec
CHARGES TO HEALTH BOARDS (26,000) (43,746) 17,746 over rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (364) (302) (62) under rec
RENTAL INCOME (27) (27) 0
OTHER INCOME (503) (587) 84 over rec
REALLOCATION OF SUPPORT COSTS (400) (400) 0
INCOME (67,791) (85,227) 17,436 over rec
NET EXPENDITURE 186,372 187,288 (916) over

Page 142

No embedded text on this page.

Page 143

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
i advise the Forum on the overall financial position of the Council’s General Fund
Revenue Account and Housing Revenue Account for the period 1 April 2022 to
15 July 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to note the following recommendation(s):-
[recs], for G
(1) that the underspend of £0.362 million on the General Fund Revenue Account
at 15 July 2022, relating to the delegated IJB budget, (section 4 and Appendix
1), be noted; and
(2) that the breakeven position on the Housing Revenue Account at 15 July 2022
(section 5 and Appendix 2 of the report), be noted. 
3. Background
3.1. The Revenue reports attached provide detail on the most recent report considered at
the Executive Committee on 24 August 2022. 
3.2. General Fund Position
This overview report will summarise the actual expenditure and income to 15 July
2022 compared with the budget for the same period for both the Council’s General
Fund (section 4) and for the Housing Revenue Account (section 5). 
4. 2022/2023 General Services Position  
4.1.  Summary position: General Services Current Position as at 15 July 2022 
As at 15 July 2022, the position on the General Services budget is a net underspend
of £0.362 million (Appendix 1), made up of variances across the Resources. The
majority of the underspend lies within Social Work Resources (Adults and Older
People) as a result of vacancies across Social Workers, Day Care and Residential
homes. This is part of the delegated IJB budget.  The core Council position, without
the IJB underspend, is a small overspend of £0.045 million.   
4.2. Inflationary / Budget Pressures 
4.2.1. General: As we have reported through papers to Council on future budget strategy,
the Council is facing exceptional cost increases across a number of areas. These
include utilities, fuel, transport costs, food costs and contracts such as PPP and
waste. There are also continued additional costs in children and families services
and education in relation to greater numbers of children in external accommodation.  
10

Page 144

4.2.2. As part of the year end financial report reported to Executive Committee in June,
funding originally provided by Government across the course of the pandemic was
set aside in reserves to meet costs of recovery into 2022/2023. This non-recurring
funding is available to help meet these additional inflationary and budget pressures
in 2022/2023.   The figures presented in the appendices to this report include £15.6
million of these funds from reserves and they will also be included in Resource
committee papers. 
4.2.3. Children and Families: Within Social Work Resources Children and Families,
budget pressures are ongoing into 2022/2023 in relation to residential placements,
fostering and kinship care, some of which is a legacy from the pandemic.  As well as
funds from the reserves being available as detailed above at section 4.2.2, a further
£3.451 million has been added to the budget from specific monies set aside in
Reserves.  This included £2.051 million approved as part of the year-end transfers to
reserves reported to Executive Committee in June 2022 and £1.400 million from the
Children and Families Residential reserve which was set aside in 2020/2021. 
4.3. Areas of Underspend 
4.3.1. Employee costs: Included within the overall position already at this point in the year
there is an underspend in employee costs (£1.5 million) which reflects the impact of
difficulties in recruiting staff across a number of areas.   This includes vacancies in
Community and Enterprise Resources (Facilities Drivers, mechanics, Environmental
Health Officers, Planning Officers, parking and roads operatives), and Social Work/
Care roles.   
4.3.2. Whilst significant efforts are made across these areas to recruit, the current level of
underspend is unlikely to be reversed.  These difficulties in recruiting are a result of
the tight labour market at present and skills shortages in certain areas, HGV drivers
for example.  The Council has put in place new recruitment and development routes
to address this recruitment challenge, however, until all posts are recruited, this level
of underspend is likely to increase.   
4.3.3. When looking at the underspend in employee costs, the broader financial position in
services including higher costs elsewhere has to be taken into account, as well as
the pressure of future savings requirements and a currently unresolved pay award.   
4.3.4. The position will continue to be monitored and an update will be reported on the
position in the regular reports to the Executive Committee. 
4.3.5. Adults and Older People:  There are likely to be further underspends in relation to
specific funding streams in Adults and Older People, where spend has not yet
commenced or is not fully committed predominantly related to the recruitment
challenges.  Finance Services are currently in discussion with the Chief Financial
Officer from the IJB to confirm the anticipated position and this will be reported back
in the regular reports to the Executive Committee. 
5. Housing Revenue Account Position
5.1. As at 15 July 2022, Appendix 2 of the report shows a breakeven position against the
phased budget on the Housing Revenue Account. Levels of rent collection are
regularly monitored by the Housing Services team and appropriate corrective action
will be taken, as required.

Page 145

6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed within this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. As detailed in section 4, inflationary and budget pressures this year
increase the risk of overspend however we have mitigated this going forwards
through providing additional funds in future years budget strategy, and in this year,
through funds available as detailed in section 4.2.1/2.  There are also emerging
underspends in employee costs (as detailed in section 4.3.1) which will help offset
increasing inflationary pressures. 
9.2. We will also continue to monitor the actual impact through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 August 2022 
Link(s) to Council Values/Priorities/Outcomes
Accountable, effective, efficient and transparent 
Previous References
i None 
List of Background Papers
i Financial ledger and budget monitoring results to 15 July 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance (Strategy)
Ext:  5637  (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk

Page 146

Appendix 1a 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 15 July 2022 (No.4) 
Committee 
Annual
Budget 
Annual
Forecast
Transfers  
Annual
Forecast
Variance
Transfers   
Budget
Proportion
To 15/07/22  
Actual 
to 
Period 4
15/07/22   
Variance 
to
15/07/22 
Departments: £m £m £m  £m  £m  £m 
Community and Enterprise Resources 122.639 122.639 0.000  32.185  32.230  (0.045) over
Facilities, Waste and Grounds 76.880 76.880 0.000  14.182  14.212  (0.030) over
Fleet, Environmental and Projects (0.504) (0.504) 0.000  0.201  0.273  (0.072) over
Leisure and Culture Services 21.087 21.087 0.000  10.669  10.668  0.001 under
Planning and Economic Development 3.558 3.558 0.000  0.139  (0.041)  0.180 under
Roads 21.618 21.618 0.000  6.994  7.118  (0.124) over
Education Resources 379.614 379.614 0.000  107.263  107.263  0.000 -
Education 379.614 379.614 0.000  107.263  107.263  0.000 -
Finance and Corporate Resources 41.650 41.650 0.000  17.526  17.526  (0.000) over
Finance Services - Strategy 2.023 2.023 0.000  0.970  0.972  (0.002) over
Finance Services - Transactions 18.676 18.676 0.000  6.928  6.857  0.071 under
Audit and Compliance Services 0.355 0.355 0.000  0.157  0.157  0.000 -
Information Technology Services 5.095 5.095 0.000  4.516  4.638  (0.122) over
Communications and Strategy Services 3.043 3.043 0.000  0.753  0.772  (0.019) over
Administration and Licensing Services 4.113 4.113 0.000  1.678  1.726  (0.048) over
Personnel Services 8.345 8.345 0.000  2.524  2.404  0.120 under
Housing and Technical Resources 17.283 17.283 0.000  7.232  7.232  0.000 -
Housing Services 8.481 8.481 0.000  3.072  3.067  0.005 under
Property Services 8.802 8.802 0.000  4.160  4.165  (0.005) over
Social Work Resources 211.484 214.484 0.000  54.093  53.686  0.407 under
Performance and Support Services 6.522 6.522 0.000  1.588  1.442  0.146 under
Children and Families 38.782 38.782 0.000  11.757  11.924  (0.167) over
Adults and Older People 164.445 164.445 0.000  40.114  39.707  0.407 under
Justice and Substance Misuse 1.735 1.735 0.000  0.634  0.613  0.021 under
Joint Boards 2.152 2.152 0.000  0.701  0.701  0.000 -           
774.822 774.822 0.000  219.000  218.638  0.362 under           
Committee 
Annual
Budget 
Annual
Forecast
Transfers  
Annual
Forecast
Variance
Transfers   
Budget
Proportion
to 15/07/22  
Actual 
to 
Period 3
15/07/22   
Variance 
to
15/07/22 
£m £m £m  £m  £m  £m 
Service Departments Total 774.822 774.822 0.000  219.000  218.638  0.360 under
CFCR 0.368 0.368 0.000  0.000  0.000  0.000 -
Loan Charges 35.111 35.111 0.000  0.000  0.000  0.000 -
Corporate Items 33.765 33.765 0.000  0.025  0.025  0.000 -
Corporate Items – Strategy (Tfr to Reserves) 17.420 17.420 0.000  0.000  0.000  0.000 
Investments – 2022/23 (Tfr to Reserves) 1.700 1.700 0.000  0.000  0.000  0.000 
Total Expenditure 863.186 863.186 0.000  219.025  218.663  0.362 under           
Council Tax 167.437 167.437 0.000  47.839  47.839  0.000 -
Less: Council Tax Reduction Scheme (23.263) (23.263) 0.000  (6.647)  (6.647)  0.000 -
Net Council Tax 144.174 144.174 0.000  41.192  41.192  0.000 -
General Revenue Grant 234.116 234.114 0.000  66.890  66.890  0.000 -
Non-Domestic Rates 422.591 422.591 0.000  120.740  120.740  0.000 -
Transfer from Reserves 62.305 62.305 0.000  62.305  62.305  0.000 -
Total Income 863.186 863.186 0.000  291.127  291.127  0.000 -           
Net Expenditure / (Income)  0.000 0.000 0.000  (72.102)  (72.464)  0.362 under

Page 147

Appendix 1b 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 15 July 2022 (No.4) 
Budget Category 
Annual
Budget 
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
To 17/05/22  
Actual 
to 
Period 4
17/05/22   
Variance 
to
17/05/22 
Service Departments:  £m £m £m  £m  £m  £m 
Expenditure          
Employee Cost 576.045 576.045 0.000  152.251  150.686  1.565 under
Property Costs 56.089 56.089 0.000  11.435  11.772  (0.337) over
Supplies and Services 65.259 65.259 0.000  15.728  14.886  0.842 under
Transport Costs 44.068 44.068 0.000  11.297  11.730  (0.433) over
Administration Costs 14.259 14.259 0.000  3.593  3.816  (0.223) over
Payments to Other Bodies 82.205 82.205 0.000  23.616  23.874  (0.258) over
Payments to Contractors 231.359 231.359 0.000  56.922  56.759  0.163 under
Transfer Payments 6.664 6.664 0.000  3.307  3.310  (0.003) over
Housing Benefits 69.107 69.107 0.000  15.698  15.698  0.000 -
Financing Charges (controllable) 2.141 2.141 0.000  0.492  0.467  0.025 under           
Total 1,147.196 1,147.196 0.000  294.339  293.998  1.341 under           
Service Departments Total 1,147.196 1,147.196 0.000  294.339  292.998  1.341 under
CFCR 0.368 0.368 0.000  0.000  0.000  0.000 -
Loan Charges 35.111 35.111 0.000  0.000  0.000  0.000 -
Corporate Items 33.765 33.765 0.000  0.025  0.025  0.000 -
Corporate Items – Strategy 17.420 17.420 0.000  0.000  0.000  0.000 -
22/23 Investments – T/f to Reserves 1.700 1.700 0.000  0.000  0.000  0.000 -           
Total Expenditure 1,235,560 1,235.560 0.000  294.364  293.023  1.341 under           
Income          
Housing Benefit Subsidy 64.158 64.158 0.000  14.256  14.256  0.000 -
Other Income 308.216 308.216 0.000  61.083  60.104  (0.979) under rec
Council Tax (Net of Council Tax Reduction
Scheme)
144.174 144.174 0.000  41.192  41.192  0.000 -
General Revenue Grant 234.116 234.116 0.000  66.890  66.890  0.000 -
Non-Domestic Rates 422.591 422.591 0.000  120.740  120.740  0.000 -
Transfer from Reserves 62.305 62.305 0.000  62.305  62.305  0.000 -           
Total Income 1,235.560 1,236.560 0.000  366.466  365.487  (0.979) under rec           
Net Expenditure / (Income) 0.000 0.000 0.000  (72.102)  (72.464)  0.362 under

Page 148

Appendix 2 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 15 July 2022 (No.4) 
Housing Revenue Account 
Annual
Budget 
Forecast 
for Year 
Annual
Forecast
Variance 
Budget
Proportion
to 15/07/22
Actual
to Period 3
15/07/22
Variance
to
15/07/22 
% Note 
£m £m £m  £m £m £m   
Employee Costs 13.914 13.914 0.000  3.677 3.659 0.018 under 0.5% 
Property Costs 46.906 46.906 0.000  15.737 15.746 (0.009) over (0.1%) 
Supplies & Services 0.609 0.609 0.000  0.109 0.118 (0.009) over (8.3%) 
Transport & Plant 0.195 0.195 0.000  0.047 0.026 0.021 under 44.7% 
Administration Costs 5.644 5.644 0.000  1.354 1.349 0.005 under 0.4% 
Payments to Other Bodies 3.030 3.030 0.000  0.601 0.601 0.000 - 0.0% 
Payments to Contractors 0.100 0.100 0.000  0.029 0.030 (0.001) over (3.4%) 
Transfer Payments 0.000 0.000 0.000  0.000 0.000 0.000 - n/a 
Financing Charges 26.050 26.050 0.000  11.333 11.333 0.000 - 0.0% 
Total Controllable Expenditure 96.448 96.448 0.000  32.887 32.862 0.025 under 0.1% 
Total Controllable Income (112.000) (112.000) 0.000  (27.238) (27.213) (0.025) under
recovered (0.1%) 
Transfer to/(from) Balance Sheet (2.773) (2.773) 0.000  (0.924) (0.924) 0.000 - 0.0% 
Net Controllable Expenditure (18.325) (18.325) 0.000  4.725 4.725 0.000 - 0.0% 
Add: Non Controllable Budgets       
Financing Charges 18.325 18.325 0.000  0.000 0.000 0.000 - 0.0% 
Total Budget 0.000 0.000 0.000  4.725 4.725 0.000 - 0.0%

Page 149

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 1 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2022/2023 - Detailed
Resource Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
i update members of the Financial Resources Scrutiny Forum of progress on the
Council’s revenue budget for the period covering 1 April 2022 to 15 July 2022.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the 2022/2023 detailed financial analysis as at period 4 (15 July 2022) for
each of the individual Resources, be noted. 
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for 2022/2023 as at 15 July 2022.  The detailed papers cover the
General Services and also the Housing Revenue Account.   
3.2. The following information is provided for each Resource and the Housing Revenue
Account: 
i An Executive Summary showing the top level position to date for each of the
Services (as detailed in the Executive Committee Report) within the Resource and
the Housing Revenue Account as at 15 July 2022 (Period 4). 
i Details of the most significant variances within the Resource and the Housing
Revenue Account across Subjective headings and across Services as at 15 July
2022 (Period 4).
i A line by line trend analysis of the total Resource expenditure and income across
subjective headings as at 15 July 2022 (Period 4). 
3.3. These are shown in Appendices A to F attached. 
4. Employee Implications
4.1. None 
5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
11

Page 150

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.   
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 August 2022 
Link(s) to Council Values/Priorities/Outcomes
i Accountable, Effective, Efficient and Transparent 
Previous References
i None 
List of Background Papers
i Revenue Ledger prints to 15 July 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance
Ext:  5637 (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk

Page 151

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 15 July 2022 (No.4)
Community and Enterprise Resources
Annual Forecast Annual Budget Actual Variance
Budget for Year Forecast Proportion to Period 4 to 15/07/22
Variance to 15/07/22 to 15/07/22
Service Departments :- £m £m £m £m £m £m
Facilities, Waste and Grounds 76.880 76.880 0.000 14.182 14.212 (0.030) over
Fleet, Environmental and Projects (0.504) (0.504) 0.000 0.201 0.273 (0.072) over
Leisure and Culture 21.087 21.087 0.000 10.669 10.668 0.001 under
Planning and Economic Development 3.558 3.558 0.000 0.139 (0.041) 0.180 under
Roads 21.618 21.618 0.000 6.994 7.118 (0.124) over
Total Community and Enterprise Resources 122.639 122.639 0.000 32.185 32.230 (0.045) over
11

Page 152

Community and Enterprise Resources Variance Analysis 2022/23 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 484k under APT&C Basic/Superannuation/NI -
682k under 
Facilities, Streets,
Waste and Grounds -
227k under
Fleet, Environmental
and Projects - 243k
under
Planning and
Economic
Development - 94k
under
Roads - 118k under 
The variance is mainly due to
vacant posts which are
currently being progressed. 
Overtime - (170k) over  Facilities, Streets,
Waste and Grounds -
(147k) over 
The overtime variance is mainly
within Waste due to high staff
absences and vehicle
availability due to outstanding
vehicle repairs. In addition,
within Grounds there was
overtime worked in respect of
vehicle checks, verge
maintenance works and
weekend work at cemeteries,
golf courses and additional
works on the removal of fly
tipping.

Page 153

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (158k) over Electricity Contract - (133k) over Roads - (134k) over The overspend is mainly due to
higher than anticipated
electricity costs for Electrical
Vehicle charging points. 
Supplies and
Services
94k under  Foodstuffs - 99k under Facilities, Streets,
Waste and Grounds -
103k under 
The underspend is mainly due
to food purchases within
Facilities Management being
lower than budgeted due to a
decreased demand in school
meals and is offset by under
recovery of income. 
Transport and
Plant 
(268k) over Fleet Services - Vehicle Hires - (48k)
over 
Fleet, Environmental
and Projects - (48k)
over 
The overspend is mainly due to
the timing of the achievement of
efficiencies within Fleet. 
Fleet Service - Repairs - (205k) over  Fleet, Environmental
and Projects - (205k)
over 
The overspend is mainly due to
the timing of the achievement of
efficiencies within Fleet. 
Income (191k)
under
recovered
Sales General - (124k) under
recovered
Facilities, Streets,
Waste and Grounds -
(123k) under recovered 
The under recovery is due to a
decrease in cash collected from
the sale of school meals within
Facilities Management due to
demand. 
Fees and Charges - General - 60k
over recovered
Facilities, Streets,
Waste and Grounds -
(47k) under recovered 
The under recovery is mainly
due to less income being
recovered from private clients
for Care of Gardens within
Grounds due to demand.

Page 154

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  Fees and Charges - General (cont) Planning and
Economic
Development - 102k
over recovered 
The over recovery is mainly due
to the level of Planning and
Building Standards applications
being greater than anticipated.  
Recharges - Departments of the
Authority - (124k) under recovered
Roads - (82k) under
recovered 
The current level of income
from routine maintenance and
Lighting reactive maintenance
is less than anticipated.

Page 155

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022-23 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
` ` `
EMPLOYEE COSTS
APT & C BASIC 68,463 269 under 447 under 18,055 17,373 682 under
APT & C OVERTIME 1,496 (29) over (96) over 252 422 (170) over
APT & C SUPERANNUATION 11,447 (28) over (49) over 3,007 3,110 (103) over
APT & C NIC 6,038 49 under 101 under 1,596 1,493 103 under
TRAVEL AND SUBSISTENCE 75 1 under 2 under 14 21 (7) over
OTHER EMPLOYEE COSTS 137 1 under 4 under 125 120 5 under
PENSION INCREASES 1,107 (4) over 9 under 308 298 10 under
ADDITIONAL PENSION COSTS 0 (9) over (16) over 0 36 (36) over
EMPLOYEE COSTS 88,763 250 under 402 under 23,357 22,873 484 under
PROPERTY COSTS
RATES 950 0 0 0 0 0
SCOTTISH WATER - UNMETERED CHARGES 28 0 0 8 8 0
SCOTTISH WATER - METERED CHARGES 101 (3) over 1 under 28 31 (3) over
RENT 775 1 under 1 under 174 171 3 under
SERVICE CHARGE 42 1 under 0 7 7 0
FACTORING CHARGES 15 0 0 3 3 0
PROPERTY INSURANCE 288 1 under 0 1 0 1 under
SECURITY COSTS 44 0 0 10 9 1 under
GROUND MAINTENANCE 8 1 under 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 10 0 (11) over 2 13 (11) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 36 3 under (4) over 1 12 (11) over
ELECTRICITY - CONTRACT 337 (29) over (88) over 61 194 (133) over
GAS 96 (11) over (2) over 41 42 (1) over
HEATING OIL 14 (1) over (1) over 2 3 (1) over
CLEANING CONTRACT 23 (15) over (13) over 17 30 (13) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 412 0 16 under 91 80 11 under
HEALTH & HYGIENE MATERIALS 37 0 0 19 19 0
WINDOW CLEANING 1 0 0 0 0 0
REFUSE UPLIFT 405 (2) over 1 under 1 0 1 under
OTHER PROPERTY COSTS 19 (3) over 1 under 4 6 (2) over
PROPERTY COSTS 3,641 (57) over (99) over 470 628 (158) over

Page 156

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022-23 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
` ` `
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 453 (4) over (6) over 180 183 (3) over
COMPUTER EQUIPMENT MAINTENANCE 75 0 0 2 0 2 under
I.T. EQUIPMENT MAINT-CONTRACT 372 (1) over (4) over 113 121 (8) over
I.T. ELECTRONIC MESSAGING 75 0 1 under 1 0 1 under
EQUIPMENT, APPARATUS AND TOOLS 882 1 under 3 under 186 191 (5) over
SMALL TOOLS 106 0 1 under 6 5 1 under
ADAPTATIONS FOR CLIENTS 0 0 0 0 3 (3) over
FURNISHINGS (INCL. CROCKERY & LINEN) 111 0 0 22 22 0
MATERIALS 7,679 6 under 12 under 1,718 1,704 14 under
MATERIALS, APPARATUS AND EQUIPMENT 9 0 0 0 1 (1) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 0 0 0 0
FOODSTUFFS - GENERAL 5,285 0 89 under 1,047 948 99 under
PROTECTIVE CLOTHING & UNIFORMS 186 0 (2) over 42 47 (5) over
LAUNDRY COSTS 10 1 under 1 under 2 2 0
OTHER SUPPLIES AND SERVICES 288 1 under 3 under 85 82 3 under
MAJOR SUPPLY OF ELECTRICAL POWER 1,457 0 0 139 139 0
DELIVERY CHARGE 1 0 0 0 1 (1) over
I- PROCUREMENT ERRORS 0 0 (1) over 0 0 0
SUPPLIES AND SERVICES 16,991 4 under 97 under 3,543 3,449 94 under
TRANSPORT AND PLANT  
PURCHASE OF PLANT 100 0 (1) over 37 36 1 under
FLEET SERVICES - DRIVERS 58 0 0 0 0 0
FLEET SERVICES - FUEL 4,459 (68) over 1 under 1,277 1,278 (1) over
FLEET SERVICES - VEHICLE HIRE 1,092 (23) over (36) over 135 183 (48) over
POOL CAR CHARGES - RENTAL 55 (2) over 1 under 10 13 (3) over
POOL CAR CHARGES - FUEL 22 0 1 under 2 0 2 under
POOL CAR CHARGES - ADDITIONAL COSTS 7 0 0 0 0 0
OTHER TRANSPORT COSTS 64 (3) over 1 under 9 8 1 under
TRANSPORT INSURANCE 93 0 0 0 0 0
LICENCES 491 0 (2) over 114 117 (3) over
EXTERNAL FUEL SUPPLY 13 0 0 0 0 0
FLEET SERVICES - REPAIRS 1,474 (109) over (172) over 424 629 (205) over
PLANT SERVICES 19 0 0 2 2 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,095 8 under 3 under 1,166 1,167 (1) over
FLEET SERVICE CHARGES - PLANT MAINTENANCE 261 0 0 70 70 0
FLEET SERVICE CHARGES - ASSET MODIFICATION 70 2 under 3 under 8 6 2 under
FLEET SERVICE CHARGES - LEASING 5,070 4 under 1 under 2,294 2,288 6 under
FLEET SERVICE CHARGES - HIRED VEHICLES 951 0 (1) over 114 123 (9) over
FLEET SERVICE CHARGES - CONTRACT HIRE 2 (7) over (7) over 0 11 (11) over
FLEET SERVICE CHARGES - ROAD FUND LICENCE 222 (3) over (2) over 52 52 0
FLEET SERVICE CHARGES - FUEL 3,519 0 2 under 927 925 2 under
FLEET SERVICE CHARGES - DRIVERS 102 0 0 0 0 0
HIRE OF EXTERNAL VEHICLES 76 0 0 0 0 0
HIRE OF EXTERNAL PLANT 287 1 under 1 under 75 74 1 under
HIRE OF SKIPS 17 0 0 7 7 0
STORAGE 0 (1) over (2) over 0 2 (2) over
TRANSPORT AND PLANT 22,619 (201) over (209) over 6,723 6,991 (268) over

Page 157

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022-23 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
` ` `
ADMINISTRATION     
PRINTING AND STATIONERY 126 (1) over 1 under 23 19 4 under
TELEPHONES 106 3 under 2 under 21 22 (1) over
MOBILE PHONES 64 3 under 2 under 4 0 4 under
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 0 0 0 0
ADVERTISING - OTHER 54 (1) over (1) over 36 35 1 under
POSTAGES/COURIERS 37 (2) over (5) over 6 10 (4) over
MEMBERSHIP FEES/SUBSCRIPTIONS 51 (1) over (1) over 30 30 0
INSURANCE 260 0 0 0 0 0
MEDICAL COSTS 2 0 (10) over 1 14 (13) over
LEGAL EXPENSES 2 0 (1) over 0 1 (1) over
HOSPITALITY / CIVIC RECOGNITION 3 0 0 0 1 (1) over
INTERNET AGENCY FEES 23 0 0 9 5 4 under
SECURITY UPLIFT FEES 26 (3) over 1 under 12 12 0
OTHER ADMIN COSTS 4 0 0 0 0 0
TRAINING 2 0 0 1 1 0
ADMINISTRATION 768 (2) over (12) over 143 150 (7) over
PAYMENT TO OTHER BODIES     
SPTE: ANNUAL BUS SUBSIDY 1,770 0 0 819 819 0
SPTE: BUS OTHER 258 0 0 129 129 0
SPTE: FERRIES 29 0 0 15 15 0
SPTE: UNDERGROUND 1,318 0 0 659 659 0
SPTE: OTHER 1,727 0 0 864 864 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 0 0 65 65 0
OTHER LOCAL AUTHORITIES 75 1 under 1 under 4 2 2 under
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 0 0 0 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 0 0 0 0
PAYMENTS TO OTHER BODIES 4,536 0 1 under 762 760 2 under
EXTERNAL AUDIT FEES 3 0 0 0 0 0
PAYMENT TO OTHER BODIES 9,908 1 under 2 under 3,317 3,313 4 under
PAYMENT TO CONTRACTORS     
PAYMENT TO TRADING SERVICES CONTRACTOR 517 (1) over 1 under 189 189 0
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 0 0 98 96 2 under
PAYMENT TO PRIVATE CONTRACTOR 43,175 1 under 0 14,072 14,074 (2) over
PAYMENT TO CONTRACTORS 43,994 0 1 under 14,359 14,359 0

Page 158

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022-23 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
` ` `
TRANSFER PAYMENTS
CONCESSIONARY FARES 603 0 0 330 330 0
TRANSFER PAYMENTS 603 0 0 330 330 0
FINANCING CHARGES     
LEASING CHARGES - FINANCE 0 0 0 0 1 (1) over
LEASING CHARGES - OPERATIONAL 1 0 (1) over 0 1 (1) over
I.T. EQUIPMENT LEASING-CONTRACT 184 (1) over (1) over 7 8 (1) over
FINANCING CHARGES 185 (1) over (2) over 7 10 (3) over
TOTAL EXPENDITURE 187,472 (6) over 180 under 52,249 52,103 146 under
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 0 0 0 0 0
CONTRIBUTIONS FROM OTHER BODIES (1,968) 4 over rec 4 over rec (1,260) (1,264) 4 over rec
SALES - GENERAL (3,689) 11 over rec (102) under rec (928) (804) (124) under rec
SALES - DEPARTMENTS OF THE AUTHORITY (118) 0 0 (105) (106) 1 over rec
FEES AND CHARGES - GENERAL (7,577) (51) under rec (33) under rec (2,215) (2,275) 60 over rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,374) 5 over rec (3) under rec (2,001) (2,008) 7 over rec
RENTAL INCOME (615) 0 0 (21) (21) 0
FLEET SERVICES (13,081) 53 over rec (22) under rec (3,222) (3,203) (19) under rec
OTHER INCOME (1,472) 11 over rec 9 over rec (477) (481) 4 over rec
RECOVERY FROM CAPITAL (1,333) 0 0 (96) (96) 0
RECHARGES - DEPARTMENTS OF THE AUTHORITY (27,569) (28) under rec (69) under rec (9,739) (9,615) (124) under rec
TOTAL INCOME (64,833) 5 over rec (216) under rec (20,064) (19,873) (191) under rec
NET EXPENDITURE 122,639 (1) over (36) over 32,185 32,230 (45) over

Page 159

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 15 July 2022 (No.4)
Education Resources
Annual Forecast Annual Budget Actual Variance
Budget for Year Forecast Proportion to Period 4 to 15/07/22
Variance to 15/07/22 to 15/07/22
Service Departments :- £m £m £m £m £m £m
Education 379.614 379.614 0.000 107.263 107.263 0.000
Total Education Resources 379.614 379.614 0.000 107.263 107.263 0.000
11

Page 160

Education Resources Variance Analysis 2022/23 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  175k under APT&C Basic / Superannuation /
National Insurance - 185k under 
Schools - 185k under  The underspend mainly relates
to Early Years posts and is the
result of staff turnover and due
to the timing of recruitment.     
Transport and
Plant
(240k) over Pupil Transport - Special Educational
Needs - (87k) over 
Schools - (87k) over  This relates to the cost of
transporting children to both
mainstream and Special
Education Needs schools. This
is a demand led service and
reflects increasing pupil
numbers and costs.   
Pupil Transport - Strathclyde
Passenger Transport - (153k) over 
Schools - (153k) over  This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs. 
Payments to Other
Bodies
(275k) over Independent School Places - (277k)
over 
Schools - (277k) over  This overspend reflects the
increased cost of placements
for pupils with additional
support needs in Independent
Schools and is due to both an
increase in the number of
places and the cost of
placements.

Page 161

Subjective Head Variance  Subjective line Service / amount Explanation
Income  302k over
recovered
Early Years Fees - 277k over
recovered 
Early Years - 277k over
recovered 
The over recovery in Early
Years fees relates to an
increased uptake of available
nursery places beyond 1140
hours.

Page 162

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS BASIC 156,618 0 0 43,532 43,532 0
TEACHERS SUPERANNUATION 36,719 0 0 9,757 9,757 0
TEACHERS NI 18,625 0 0 5,371 5,371 0
DAILY TEACHERS BASIC 1,206 0 0 491 491 0
TEACHERS TRAINING 509 0 0 55 55 0
APT&C BASIC 61,900 39 under 69 under 16,435 16,321 114 under
APT&C SUPERANNUATION 11,446 17 under 20 under 3,157 3,131 26 under
APT&C NIC 5,003 22 under 30 under 1,300 1,255 45 under
SESSIONAL WORK 32 0 0 32 32 0
TRAVEL AND SUBSISTANCE 239 0 1 under 38 38 0
OTHER EMPLOYEE COSTS 515 0 0 104 104 0
PENSION INCREASES 434 0 5 under 108 101 7 under
PREMATURE RETIRALS 4,660 0 (6) over 1,165 1,175 (10) over
ADDITIONAL PENSION COSTS 0 0 (1) over 0 7 (7) over
EMPLOYEE COSTS 297,906 78 under 118 under 81,545 81,370 175 under
PROPERTY COSTS
RATES 15,497 0 0 0 0 0
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 955 6 under 0 160 160 0
SCOTTISH WATER - METERED CHARGES 691 (6) over 0 263 263 0
RENT 256 0 0 72 72 0
SERVICE CHARGE 33 0 0 26 26 0
PROPERTY INSURANCE 480 0 0 5 5 0
SECURITY COSTS 62 0 0 15 15 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 62 0 0 8 8 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 4 0 0 4 4 0
ADAPTIONS - INTERNAL CONTRACTORS 59 0 0 59 59 0
ELECTRICITY  - CONTRACT 3,758 0 0 322 322 0
GAS 2,240 0 0 677 677 0
HEATING OIL 71 0 0 27 27 0
SOLID FUEL 187 0 0 31 31 0
JANITOR SERVICE 50 0 0 15 15 0
JANITORIAL SUPPLIES 23 0 0 0 0 0
CLEANING CONTRACT 646 0 0 413 413 0
CLEANING OUTWITH CONTRACT 12 0 0 0 0 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 434 0 0 133 133 0
HEALTH & HYGIENE MATERIALS 127 0 0 2 2 0
WINDOW CLEANING 4 0 0 0 0 0
STEWARD SERVICE 1 0 0 0 0 0
REFUSE UPLIFT 15 0 0 0 0 0
REMOVAL & STORAGE COSTS 2 0 0 2 2 0
OTHER PROPERTY COSTS 129 0 0 56 56 0
OFFICE ACCOM-FACILITIES MANAGEMENT 4 0 0 4 4 0
ACCOMMODATION RECHARGE TO USERS 882 0 0 882 882 0
PROPERTY COSTS 26,684 0 0 3,176 3,176 0

Page 163

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 240 0 0 145 145 0
COMPUTER EQUIPMENT RENTAL 1 0 0 0 0 0
I.T. EQUIPMENT MAINT-CONTRACT 3,154 0 0 1,116 1,116 0
I.T. ELECTRONIC MESSAGING 23 0 0 0 0 0
EQUIPMENT, APPARATUS AND TOOLS 100 0 0 64 64 0
SMALL TOOLS 2 0 0 2 2 0
AIDS FOR CLIENTS 117 7 under 0 0 0 0
ADAPTATIONS FOR CLIENTS 0 (7) over 0 0 0 0
FURNITURE - OFFICE 10 0 0 8 8 0
FURNITURE - GENERAL 142 0 0 62 62 0
FURNISHINGS (INCL. CROCKERY & LINEN) 6 0 0 5 5 0
MATERIALS 13 0 0 9 9 0
MATERIALS, APPARATUS AND EQUIPMENT 2,228 0 0 896 896 0
PUPIL EQUITY FUNDING 7,736 0 0 0 0 0
SAC FUNDING 580 0 0 0 0 0
LIBRARY/RESOURCE CENTREMATERIALS 83 0 0 23 23 0
LIBRARY CUSTOMER RESOURCES 0 0 0 0 0 0
AUDIO VISUAL 12 0 0 11 11 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 17 0 0 8 8 0
TV LICENCES - EDUCATION 25 0 0 7 7 0
FOODSTUFFS - GENERAL 21 0 0 15 15 0
PROTECTIVE CLOTHING & UNIFORMS 57 0 0 43 43 0
LAUNDRY COSTS 1 0 0 0 0 0
OTHER SUPPLIES AND SERVICES 23 0 0 0 0 0
HEALTH AND SAFETY 69 0 0 0 0 0
CATERING - CONTRACT 3,155 0 0 132 106 26 under
CATERING - OUTWITH CONTRACT 8 0 0 1 1 0
CATERING - EXTERNAL 10 0 0 7 7 0
ARTIST FEES / PERFORMING ARTS / ENTERTA 6 0 0 6 6 0
DELIVERY CHARGE 4 0 0 3 3 0
SUPPLIES AND SERVICES 17,843 0 0 2,563 2,537 26 under

Page 164

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 2 (1) over (1) over 2 2 0
OTHER TRANSPORT COSTS 2 0 0 0 0 0
INSURANCE 3 0 0 0 0 0
FLEET SERVICE CHARGES - SCHEDULED MAINTENANCE 78 23 under 2 under 0 0 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 41 0 1 under 7 7 0
FLEET SERVICE CHARGES - LEASING 24 (21) over 0 24 24 0
FLEET SERVICE CHARGES - HIRED VEHICLES 3 0 (3) over 3 3 0
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 4 (1) over 0 1 1 0
FLEET SERVICE CHARGES - FUEL 99 (1) over 0 27 27 0
FLEET SERVICE CHARGES - DRIVERS 1,018 0 0 0 0 0
FLEET SERVICE CHARGES - BUS ESCORTS 258 0 0 92 92 0
HIRE OF EXTERNAL VEHICLES 69 0 5 under 69 69 0
HIRE OF SKIPS 5 (1) over (3) over 5 5 0
EXTERNAL TRANSPORT CONTRACT 2 (1) over (2) over 2 2 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 4,886 0 0 1,081 1,168 (87) over
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 5,333 (92) over (153) over 1,521 1,674 (153) over
PUPIL TRANSPORT - OTHER 131 0 0 79 79 0
TRANSPORT AND PLANT 11,958 (95) over (154) over 2,913 3,153 (240) over
ADMINISTRATION
PRINTING AND STATIONERY 368 0 0 132 132 0
TELEPHONES 213 0 0 44 44 0
MOBILE PHONES 7 0 0 0 0 0
ADVERTISING - OTHER 11 0 0 0 0 0
POSTAGES/COURIERS 76 0 0 10 10 0
MEMBERSHIP FEES/SUBSCRIPTIONS 89 0 0 89 89 0
INSURANCE 78 0 0 0 0 0
MEDICAL COSTS 8 0 0 8 8 0
HOSPITALITY / CIVIC RECOGNITION 23 0 0 23 23 0
SECURITY UPLIFT FEES 2 0 0 2 2 0
OTHER ADMIN COSTS 2 0 0 0 0 0
CONFERENCES - OFFICIALS (incl associated costs) 52 4 under 8 under 12 0 12 under
TRAINING 104 0 0 69 69 0
ADMINISTRATION 1,033 4 under 8 under 389 377 12 under

Page 165

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
PAYMENT TO OTHER BODIES
OTHER LOCAL AUTHORITIES 1,431 (27) over (27) over 313 340 (27) over
SCOTTISH QUALIFICATIONS AUTHORITY 1,563 0 0 1,557 1,557 0
PAYMENTS TO OTHER BODIES 19,298 0 24 under 5,582 5,553 29 under
INDEPENDENT SCHOOL PLACES 3,507 0 (98) over 745 1,022 (277) over
CONTRACT SPEECH THERAPY 678 0 0 0 0 0
SCHOOL ACTIVITIES 175 0 0 175 175 0
RESEARCH GRANTS - EDUCATION 41 0 0 41 41 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 28 0 0 0 0 0
P.E. FACILITIES 91 0 0 2 2 0
ACTIVITIES PROGRAMME 398 0 0 177 177 0
COUNSELLING 887 0 0 96 96 0
COPYRIGHT AGREEMENT 186 0 0 186 186 0
VAT FREE EXCURSIONS - EDUCATION 7 0 0 0 0 0
PRIVATE INDIVIDUALS - GENERAL 6 0 0 6 6 0
PAYMENT TO OTHER BODIES 28,296 (27) over (101) over 8,880 9,155 (275) over
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 38,776 0 0 9,617 9,617 0
PAYMENT TO CONTRACTORS 38,776 0 0 9,617 9,617 0
TRANSFER PAYMENTS
EDUCATION MAINTENANCE ALLOWANCE 286 0 0 286 286 0
FOOTWEAR & CLOTHING GRANTS 1,944 0 0 1,313 1,313 0
WORK EXPERIENCE 20 0 0 0 0 0
TRANSFER PAYMENTS 2,250 0 0 1,599 1,599 0
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 3 0 0 0 0 0
I.T. EQUIPMENT LEASING - CONTRACT 352 0 0 64 64 0
FINANCING CHARGES 355 0 0 64 64 0
TOTAL EXPENDITURE 425,101 (40) over (129) over 110,746 111,048 (302) over

Page 166

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) 0 0 (85) (85) 0
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (41,305) 0 0 (1,293) (1,293) 0
CONTRIBUTIONS FROM OTHER BODIES (1,898) 0 0 (1,028) (1,053) 25 over rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (770) 0 0 0 0 0
PLAYGROUP ACCOMMODATION CHARGE (10) 0 0 0 0 0
EARLY YEARS FEES (373) 40 over rec 129 over rec (164) (441) 277 over rec
RENTAL INCOME (20) 0 0 (1) (1) 0
COURSE FEES (35) 0 0 (21) (21) 0
OTHER INCOME (24) 0 0 (9) (9) 0
ACCOMMODATION INCOME FROM USERS (882) 0 0 (882) (882) 0
INCOME (45,487) 40 over rec 129 over rec (3,483) (3,785) 302 over rec
NET EXPENDITURE 379,614 0 0 107,263 107,263 0

Page 167

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 15 July 2022 (No.4)
Finance and Corporate Resources
Annual Forecast Annual Budget Actual Variance
Budget for Year Forecast Proportion to Period 4 to 15/07/22
Variance to 15/07/22 to 15/07/22
Service Departments :- £m £m £m £m £m £m
Finance Services - Strategy 2.023 2.023 0.000 0.970 0.972 (0.002) over
Finance Services - Transactions 18.676 18.676 0.000 6.928 6.857 0.071 under
Audit and Compliance Services 0.355 0.355 0.000 0.157 0.157 0.000
Information Technology Services 5.095 5.095 0.000 4.516 4.638 (0.122) over
Communications and Strategy Services 3.043 3.043 0.000 0.753 0.772 (0.019) over
Administration and Licensing Services 4.113 4.113 0.000 1.678 1.726 (0.048) over
Personnel Services 8.345 8.345 0.000 2.524 2.404 0.120 under
Total Finance and Corporate Resources 41.650 41.650 0.000 17.526 17.526 0.000
11

Page 168

Finance and Corporate Resources Variance Analysis 2022/23 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  216k under  APT&C Basic / Superannuation / NI -
267k under
Finance Services
(Transactions) - 137k
under 
The underspend is due to
vacant posts within the
Service which are being
recruited in line with Service
requirements. 
Personnel Services -
153k under
The underspend is due to the
timing of employability and
funded projects. 
Overtime - (47k) over Finance Services
(Transactions) - (39k)
over
The overspend relates to the
costs of managing the staffing
requirements of the 24-hour
customer call centre. 
Supplies and
Services 
(142k) over  Computer Equipment Maintenance -
(124k) over 
IT Services - (133k)
over 
The overspend reflects the
costs of IT contracts in
relation to software licenses
and the associated costs of
the new Cloud Hosting
Service 
Administration
Costs
(85k) over Postages/Couriers - (23k) over  Finance Services
(Transactions) - (17k)
over 
The overspend is due to the
volume of transactions within
Benefits and Revenues being
higher than anticipated.

Page 169

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs (cont) 
Medical Costs - (16k) over  Personnel Services -
(18k) over 
This overspend is due to
higher than anticipated staff
medicals, offset by additional
income from recharges.

Page 170

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 26,764 26 under 55 under 6,987 6,795 192 under
APT & C OVERTIME 75 (18) over (30) over 19 66 (47) over
APT & C SUPERANNUATION 5,287 37 under 74 under 1,362 1,308 54 under
APT & C NIC 2,851 15 under 43 under 729 706 23 under
MANUAL BASIC 15 (2) over 0 4 6 (2) over
MANUAL SUPERANNUATION 0 (1) over 0 0 0 0
TRAVEL AND SUBSISTANCE 34 2 under 4 under 9 4 5 under
OTHER EMPLOYEE COSTS 422 (3) over 55 under 64 65 (1) over
PENSION INCREASES 833 (12) over (6) over 224 232 (8) over
ADDITIONAL PENSION COSTS 0 1 under 0 0 0 0
EMPLOYEE COSTS 36,281 45 under 195 under 9,398 9,182 216 under
PROPERTY COSTS
RATES 109 0 0 0 0 0
SCOTTISH WATER - METERED CHARGES 9 1 under 2 under 2 (1) 3 under
RENT 50 2 under 6 under 9 3 6 under
SERVICE CHARGE 1 0 1 under 0 0 0
PROPERTY INSURANCE 1 0 1 under 0 0 0
SECURITY COSTS 104 7 under 1 under 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRATOR 0 0 (1) over 0 1 (1) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRATOR 2 (1) over (1) over 0 1 (1) over
ELECTRICITY  - CONTRACT 440 7 under 2 under 3 3 0
GAS 14 1 under 2 under 0 0 0
FIXTURE & FITTINGS 1,707 0 0 182 182 0
JANITOR SERVICE 0 (1) over (1) over 0 1 (1) over
HEALTH & HYGIENE MATERIALS 40 0 6 under 0 0 0
REFUSE UPLIFT 2 0 0 0 0 0
REMOVAL & STORAGE COSTS 0 (1) over (1) over 0 1 (1) over
OTHER PROPERTY COSTS 16 0 1 under 2 2 0
PROPERTY COSTS 2,495 15 under 18 under 198 193 5 under

Page 171

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 2,468 (1) over (10) over 720 736 (16) over
COMPUTER EQUIPMENT MAINTENANCE 3,061 4 under 5 under 2,148 2,272 (124) over
I.T. EQUIPMENT MAINT - CONTRACT 653 6 under 16 under 223 220 3 under
I.T. ELECTRONIC MESSAGING 138 6 under 6 under 5 1 4 under
EQUIPMENT, APPARATUS AND TOOLS 192 1 under 24 under 48 26 22 under
SUPPLIES FOR CLIENTS 227 (1) over 17 under 53 35 18 under
FURNITURE - OFFICE 0 (1) over (2) over 0 2 (2) over
MATERIALS 78 0 (12) over 18 38 (20) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 7 0 0 1 1 0
FOODSTUFFS - GENERAL 11 6 under 2 under 1 7 (6) over
PROTECTIVE CLOTHING & UNIFORMS 5 0 1 under 0 1 (1) over
OTHER SUPPLIES AND SERVICES 3,153 0 3 under 1,323 1,336 (13) over
CATERING - OUTWITH CONTRACT 6 0 1 under 1 0 1 under
OUTSOURCED MAIL 134 0 (5) over 31 39 (8) over
SUPPLIES AND SERVICES 10,133 20 under 46 under 4,572 4,714 (142) over
TRANSPORT AND PLANT
POOL CAR CHARGES - RENTAL 25 1 under 3 under 4 0 4 under
POOL CAR CHARGES - FUEL 6 0 0 0 0 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 1 0 0 0 0 0
FLEET SERVICE CHARGES - LEASING 5 0 0 1 1 0
FLEET SERVICE CHARGES - FUEL 1 0 0 0 0 0
FLEET SERVICE CHARGES - DRIVERS 36 1 under 5 under 0 0 0
TRANSPORT AND PLANT 74 2 under 8 under 5 1 4 under

Page 172

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
ADMINISTRATION
PRINTING AND STATIONERY 579 1 under (5) over 22 29 (7) over
TELEPHONES 1,797 (1) over 4 under 447 445 2 under
MOBILE PHONES 395 0 2 under 40 40 0
ADVERTISING - RECRUITMENT 28 0 (11) over 28 32 (4) over
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 0 0 0 0
ADVERTISING - OTHER 138 0 (1) over 32 36 (4) over
POSTAGES/COURIERS 872 (11) over (33) over 222 245 (23) over
SMS MESSAGING 2 0 0 0 4 (4) over
MEMBERSHIP FEES/SUBSCRIPTIONS 214 (4) over (8) over 185 191 (6) over
INSURANCE 139 0 0 0 0 0
MEDICAL COSTS 221 1 under (44) over 48 64 (16) over
LEGAL EXPENSES 219 (4) over (3) over 15 25 (10) over
HOSPITALITY / CIVIC RECOGNITION 30 (1) over 1 under 6 7 (1) over
PAYPOINT AGENCY FEES 90 (1) over 0 18 20 (2) over
SECURITY UPLIFT FEES 6 0 0 0 0 0
OTHER ADMIN COSTS (369) (36) over (120) over 211 217 (6) over
MEMBERS ALLOWANCES 1,788 11 under 2 under 478 481 (3) over
CONFERENCES - MEMBERS (incl associated costs) 9 1 under 1 under 0 2 (2) over
CONFERENCES - OFFICIALS (incl associated costs) 13 0 1 under 1 0 1 under
TRAINING 767 0 1 under 187 185 2 under
VOLUNTEERS' EXPENSES 0 0 (1) over 0 2 (2) over
INTERNAL SUPPORT SERVICES ALLOCATION 42 0 0 0 0 0
ADMINISTRATION 6,981 (44) over (214) over 1,940 2,025 (85) over
PAYMENT TO OTHER BODIES
GRANTS TO VOLUNTARY ORGANISATIONS 678 0 0 343 343 0
PAYMENTS TO OTHER BODIES 6,575 (5) over (3) over 1,367 1,370 (3) over
EXTERNAL AUDIT FEES 516 0 0 177 177 0
PRIVATE INDIVIDUALS - GENERAL 1 1 under 1 under 0 0 0
PAYMENT TO OTHER BODIES 7,770 (4) over (2) over 1,887 1,890 (3) over
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 40 0 0 15 15 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 231 0 0 13 13 0
PAYMENT TO CONTRACTORS 271 0 0 28 28 0

Page 173

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
TRANSFER PAYMENTS
RENT ALLOWANCE 27,581 0 0 5,780 5,780 0
RENT REBATES 41,526 0 0 9,918 9,918 0
TRANSFER PAYMENTS 69,107 0 0 15,698 15,698 0
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 1 0 0 0 0 0
I.T. EQUIPMENT LEASING-CONTRACT 1,079 2 under 5 under 375 374 1 under
FINANCING CHARGES 1,080 2 under 5 under 375 374 1 under
TOTAL EXPENDITURE 134,192 36 under 56 under 34,101 34,105 (4) over
INCOME
STATUTORY ADDITIONS - COST OF COLLECTION (740) 0 0 0 0 0
RENT REBATES SUBSIDY (37,091) 0 0 (8,704) (8,704) 0
RENT ALLOWANCE SUBSIDY (27,067) 0 0 (5,552) (5,552) 0
DWP SUBSIDY (1,138) 0 0 (270) (270) 0
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (85) 8 under (13) over (34) (34) 0
CONTRIBUTIONS FROM OTHER BODIES (3,121) 3 under 0 (51) (63) 12 under
ESF GRANT (674) 0 16 under 0 (23) 23 under
SALES - GENERAL 0 (7) over (4) over 0 0 0
SALES - DEPARTMENTS OF THE AUTHORITY (32) 0 0 0 0 0
FEES AND CHARGES - GENERAL (4,402) (9) over (1) over (727) (731) 4 under
CHARGES TO HEALTH BOARDS (38) 0 0 0 0 0
FEES AND CHARGES - OTHER BODIES (246) 0 (9) over (94) (92) (2) over
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,899) 0 (13) over (537) (499) (38) over
RENTAL INCOME (2) 0 11 under 0 (11) 11 under
BIRTH REGISTRATION (35) 0 (1) over (8) (6) (2) over
DEATH REGISTRATION (71) 0 2 under (16) (17) 1 under
MARRIAGE STATUTORY FEES (98) 0 12 under (23) (40) 17 under
EXTRACT ISSUE (96) 0 6 under (22) (29) 7 under
MARRIAGES (78) (1) over (3) over (18) (13) (5) over
CITIZENSHIP CEREMONIES (10) 1 under 2 under (2) (4) 2 under
NATIONAL CHECKING SERVICE (71) 0 (11) over (16) 0 (16) over
OTHER INCOME (7,875) (14) over (4) over (500) (490) (10) over
REALLOCATION OF CENTRAL SUPPORT COSTS (6,598) 0 0 0 0 0
REALLOCATION OF SUPPORT COSTS (75) 0 0 0 0 0
INCOME (92,542) (19) under rec (10) under rec (16,574) (16,578) 4 over rec
NET EXPENDITURE 41,650 17 under 46 under 17,527 17,527 0

Page 174

No embedded text on this page.

Page 175

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 15 July 2022 (No.4)
Housing and Technical Resources
Annual Forecast Annual Budget Actual Variance
Budget for Year Forecast Proportion to Period 4 to 15/07/22
Variance to 15/07/22 to 15/07/22
Service Departments :- £m £m £m £m £m £m
Housing Services 8.481 8.481 0.000 3.072 3.067 0.005 under
Property Services 8.802 8.802 0.000 4.160 4.165 (0.005) over
Total Housing and Technical Resources 17.283 17.283 0.000 7.232 7.232 0.000
11

Page 176

Housing and Technical Resources (excl HRA) Variance Analysis 2022/23 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 79k under APT&C Basic / Overtime /
Superannuation / National Insurance -
358k under
Property Services -
348k under 
The variance relates to
vacancies which are actively
being recruited in line with
Service requirements. 
Manual Basic / Overtime /
Superannuation / National Insurance -
(276k) over 
Property Services -
(267k) over 
The variance reflects the
current level of trade operatives
and overtime required to meet
service demands.   
Property Costs (133k) over Service Charge - (135k) over  Property Services -
(135k) over 
The overspend relates to the
cost of shopping centre service
charges which are not
recoverable from tenants. 
Supplies and
Services 
632k under Materials - 627k under Property Services -
627k under 
Expenditure on materials varies
depending on the current
workload demands and timing
of works on a wide variety of
capital and revenue works. 
Payments to
Contractors
360k under Payments to Private Contractors -
601k under
Property Services -
601k under
Expenditure on contractor
payments varies depending on
the current workload demands
and timing of works on a wide
variety of capital and revenue
works.

Page 177

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors (cont) 
Payments to External Consultants -
(241k) over
Property Services -
(241k) over
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet current service demands. 
Income (1,002k)
under
recovered
Recovery from Capital / Recharges –
Departments of the Authority -
(1,062k) under recovered 
Property Services -
(1,062k) under
recovered 
The level of income recovered
varies depending on the current
workload and the timing of a
wide variety of projects and is
offset by a reduction in
expenditure.

Page 178

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS OVERTIME 0 0 - 0 - 0 1 (1) over
APT & C BASIC 15,110 111 under 169 under 4,006 3,756 250 under
APT & C OVERTIME 199 4 under 9 under 52 46 6 under
APT & C SUPERANNUATION 2,929 31 under 42 under 771 710 61 under
APT & C NIC 1,714 20 under 31 under 449 408 41 under
MANUAL BASIC 17,903 (29) over (93) over 4,730 4,881 (151) over
MANUAL OVERTIME 545 3 under (41) over 144 222 (78) over
MANUAL SUPERANNUATION 3,447 (2) over (15) over 911 934 (23) over
MANUAL NIC 1,965 (6) over (16) over 520 544 (24) over
TRAVEL AND SUBSISTANCE 25 0 - 2 under 7 3 4 under
OTHER EMPLOYEE COSTS (27) (1) over (3) over (7) (8) 1 under
PENSION INCREASES 602 (25) over 5 under 157 150 7 under
ADDITIONAL PENSION COSTS 13 (5) over (5) over 0 14 (14) over
EMPLOYEE COSTS 44,425 101 under 85 under 11,740 11,661 79 under

Page 179

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
PROPERTY COSTS
RATES 2,126 16 under 25 under 0 0 0 -
SCOTTISH WATER - UNMETERED CHARGES 12 (2) over (1) over 3 4 (1) over
SCOTTISH WATER - METERED CHARGES 241 (3) over (4) over 56 55 1 under
RENT 1,357 (1) over (1) over 338 340 (2) over
SERVICE CHARGE 141 (10) over (116) over 22 157 (135) over
FACTORING CHARGES 9 0 - 0 - 1 0 1 under
OTHER ACCOMMODATION COSTS 2,434 0 - 0 - 1,673 1,673 0 -
BED AND BREAKFAST 27 3 under 5 under 7 1 6 under
PROPERTY INSURANCE 295 0 - 0 - 0 0 0 -
SECURITY COSTS 299 21 under 28 under 70 55 15 under
GROUND MAINTENANCE 52 0 - 0 - 0 0 0 -
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 0 - 1 under 2 2 0 -
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 2,724 2 under (3) over 627 627 0 -
LIFE CYCLE MAINTENANCE 3,558 0 - 0 - 1,129 1,128 1 under
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 380 (4) over 19 under 270 285 (15) over
HOUSING - RENT FREE ACCOMMODATION 0 0 - (1) over 0 2 (2) over
HOUSING - RENT W/O UNLET PERIODS 679 (1) over 0 - 198 198 0 -
HOUSING - RENT W/O BAD PERIODS 817 8 under 6 under 28 17 11 under
ASBESTOS 0 (3) over (4) over 0 4 (4) over
ELECTRICITY  - CONTRACT 883 0 - 7 under 91 89 2 under
ELECTRICITY  - NON CONTRACT 29 0 - 3 under 7 3 4 under
GAS 237 (6) over (2) over 79 85 (6) over
HEATING OIL 12 (3) over (3) over 3 6 (3) over
FIXTURE & FITTINGS 809 6 under 6 under 218 221 (3) over
JANITOR SERVICE 164 2 under 2 under 152 152 0 -
CLEANING CONTRACT 407 (1) over 7 under 403 428 (25) over
CLEANING OUTWITH CONTRACT 0 (5) over (7) over 0 0 0 -
CLEANING MATERIALS 10 0 - 0 - 2 2 0 -
WINDOW CLEANING 2 (1) over (1) over 1 1 0 -
PEST CONTROL 6 0 - 1 under 1 0 1 under
REFUSE UPLIFT 404 24 under 20 under 88 65 23 under
REMOVAL & STORAGE COSTS 131 (1) over 1 under 19 25 (6) over
OTHER PROPERTY COSTS 510 3 under 4 under 152 143 9 under
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 (11) over (15) over 1,113 1,113 0 -
ACCOMMODATION RECHARGE TO USERS 33 (3) over (7) over 8 13 (5) over
PROPERTY COSTS 19,911 30 under (30) over 6,761 6,894 (133) over

Page 180

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 475 (1) over 11 under 250 261 (11) over
COMPUTER EQUIPMENT MAINTENANCE 6 2 under 0 - 2 0 2 under
I.T. EQUIPMENT MAINT-CONTRACT 223 9 under 7 under 12 1 11 under
EQUIPMENT, APPARATUS AND TOOLS 46 5 under 4 under 10 2 8 under
ADAPTATIONS FOR CLIENTS 500 0 - 0 - 112 112 0 -
FURNITURE - GENERAL 0 0 - 0 - 0 4 (4) over
FURNISHINGS 0 0 - (3) over 0 4 (4) over
MATERIALS 12,787 71 under 873 under 3,226 2,599 627 under
AUDIO VISUAL 10 1 under (2) over 2 4 (2) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 3 0 - 0 - 0 0 0 -
TV LICENCES - EDUCATION 1 (1) over (1) over 0 1 (1) over
FOODSTUFFS - GENERAL 2 0 - 0 - 0 0 0 -
PROTECTIVE CLOTHING & UNIFORMS 44 2 under 1 under 10 9 1 under
OTHER SUPPLIES AND SERVICES 92 4 under 6 under 42 36 6 under
HEALTH AND SAFETY 1 0 - 0 - 0 0 0 -
CATERING - CONTRACT 1 0 - 0 - 0 0 0 -
OUTSOURCED MAIL 0 0 - 0 - 0 1 (1) over
SUPPLIES AND SERVICES 14,191 92 under 896 under 3,666 3,034 632 under
TRANSPORT AND PLANT
PURCHASE OF PLANT 125 2 under 1 under 29 33 (4) over
FLEET SERVICES - FUEL 0 (3) over (3) over 0 7 (7) over
POOL CAR RECHARGE - RENTAL CHARGE 122 3 under 6 under 20 18 2 under
POOL CAR RECHARGE - FUEL 26 1 under 2 under 3 0 3 under
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 - 0 - 0 0 0 -
TRANSPORT INSURANCE 44 6 under 9 under 11 0 11 under
PLANT SERVICES 7 0 - 0 - 2 0 2 under
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 328 4 under 5 under 75 97 (22) over
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 - 0 - 0 0 0 -
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 0 - (2) over 2 6 (4) over
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 2 under 3 under 3 1 2 under
FLEET SERVICE CHARGES LEASING 1,397 (8) over (5) over 323 306 17 under
FLEET SERVICE CHARGES HIRED VEHICLES 201 23 under 0 - 47 13 34 under
FLEET SERVICE CHARGES CONTRACT HIRE 48 9 under 12 under 9 2 7 under
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 116 2 under 2 under 27 46 (19) over
FLEET SERVICE CHARGES FUEL 800 (2) over 9 under 185 249 (64) over
HIRE OF EXTERNAL PLANT 257 30 under 45 under 59 13 46 under
HIRE OF SCAFOLDING 1,077 80 under 33 under 248 216 32 under
HIRE OF SKIPS 33 (12) over (21) over 7 3 4 under
TAXI CHARGES - CONTRACTED 12 0 - 1 under 3 1 2 under
TRANSPORT AND PLANT 4,617 137 under 97 under 1,053 1,011 42 under

Page 181

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
ADMINISTRATION
PRINTING AND STATIONERY 81 7 under 4 under 18 12 6 under
TELEPHONES 94 4 under 5 under 22 15 7 under
MOBILE PHONES 42 3 under 7 under 8 0 8 under
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 7 0 - 0 - 0 0 0 -
ADVERTISING - OTHER 6 0 - 1 under 2 0 2 under
POSTAGES/COURIERS 21 (2) over (5) over 3 11 (8) over
MEMBERSHIP FEES/SUBSCRIPTIONS 13 (4) over (3) over 3 6 (3) over
INSURANCE 216 2 under 4 under 48 48 0 -
MEDICAL COSTS 17 2 under 0 - 3 3 0 -
LEGAL EXPENSES 16 (2) over (9) over 1 10 (9) over
PETTY OUTLAYS 12 1 under 2 under 3 6 (3) over
HOSPITALITY / CIVIC RECOGNITION 2 0 - 0 - 0 0 0 -
OTHER ADMIN COSTS 13 0 - (1) over 3 4 (1) over
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 - 0 - 121 121 0 -
CENTRAL ADMINISTRATION 2,749 0 - 0 - 798 798 0 -
ADMINISTRATION 3,746 11 under 5 under 1,033 1,034 (1) over
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 1,770 0 - 0 - 467 459 8 under
PAYMENTS TO OTHER BODIES 1,279 0 - 0 - 182 188 (6) over
SUPPORTING PEOPLE INTERNAL PROVIDER 1,129 0 - 0 - 373 373 0 -
SUPPORTING PEOPLE EXTERNAL PROVIDER 727 0 - 3 under 154 152 2 under
HOUSING ADMINISTRATION 1,170 0 - 0 - 360 360 0 -
ASSISTANCE TO HOME OWNERS 1,983 0 - (1) over 298 298 0 -
PRIVATE INDIVIDUALS - GENERAL 150 0 - 0 - 38 40 (2) over
PAYMENT TO OTHER BODIES 8,208 0 - 2 under 1,872 1,870 2 under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 18,525 106 under 742 under 4,813 4,212 601 under
PAYMENT TO EXTERNAL CONSULTANTS 231 (86) over (217) over 80 321 (241) over
PAYMENT TO CONTRACTORS 18,756 20 under 525 under 4,893 4,533 360 under

Page 182

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 152 7 under 16 under 30 9 21 under
INTEREST ON REVENUE BALANCES 2 0 - 0 - 0 0 0 -
FINANCING CHARGES 154 7 under 16 under 30 9 21 under
TOTAL EXPENDITURE 114,008 398 under 1,596 under 31,048 30,046 1,002 under
INCOME
CONTRIBUTIONS FROM OTHER BODIES (987) 0 - 0 - 0 0 0 -
SALES - DEPARTMENTS OF THE AUTHORITY (460) (9) under rec (9) under rec (153) (153) 0 -
FEES AND CHARGES - GENERAL (592) (16) under rec (3) under rec (77) (77) 0 -
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (48) 0 - 0 - 0 0 0 -
RENTAL INCOME (4,775) 1 over rec (7) under rec (1,293) (1,298) 5 over rec
HOUSE RENTS (5,494) (8) under rec (12) under rec (1,252) (1,250) (2) under rec
OTHER INCOME (2,724) (10) under rec 3 over rec (620) (700) 80 over rec
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 - 0 - 0 0 0 -
REALLOCATION OF SUPPORT COSTS (1,628) (88) under rec (12) under rec (253) (253) 0 -
RECOVERY FROM CAPITAL (40,983) (1,148) under rec (3,081) under rec (10,856) (7,432) (3,424) under rec
RECHARGES - DEPRTMENTS OF THE AUTHORITY (38,059) 880 over rec 1,525 over rec (9,289) (11,651) 2,362 over rec
MANUAL RECHARGES - DEPARTMENTS OF THE AUTHORITY (99) 0 - 0 - (23) 0 (23) under rec
INCOME (96,725) (398) under rec (1,596) under rec (23,816) (22,814) (1,002) under rec
NET EXPENDITURE 17,283 0 - 0 - 7,232 7,232 0 -

Page 183

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2022/23 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (9k) over Electricity - Contract - 43k under  HRA The underspend is due to
charges being lower than
anticipated to date. 
11

Page 184

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 10,594 (11) over (5) over 2,799 2,801 (2) over
APT & C OVERTIME 79 (1) over (2) over 21 29 (8) over
APT & C SUPERANNUATION 1,880 (2) over (10) over 497 509 (12) over
APT & C NIC 1,102 13 under 23 under 291 261 30 under
TRAVEL AND SUBSISTANCE 40 3 under 5 under 10 2 8 under
PENSION INCREASES 219 (11) over 6 under 59 54 5 under
ADDITIONAL PENSION COSTS 0 0 - (3) over 0 3 (3) over
EMPLOYEE COSTS 13,914 (9) over 14 under 3,677 3,659 18 under
PROPERTY COSTS
RATES 105 0 - 0 - 0 0 0 -
SCOTTISH WATER - UNMETERED CHARGES 4 (1) over 0 - 1 2 (1) over
SCOTTISH WATER - METERED CHARGES 8 0 - 0 - 2 2 0 -
RENT 6 0 - 0 - 6 0 6 under
SERVICE CHARGE 65 (1) over (1) over 0 2 (2) over
OTHER ACCOMMODATION COSTS 31 0 - 0 - 0 0 0 -
PROPERTY INSURANCE 923 0 - 0 - 0 0 0 -
SECURITY COSTS 55 4 under 8 under 13 39 (26) over
GROUND MAINTENANCE 4,257 0 - 0 - 3,954 3,954 0 -
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 32,392 0 - 0 - 10,209 10,222 (13) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 0 - 0 - 207 218 (11) over
HOUSING - RENT FREE ACCOMMODATION 155 7 under 7 under 45 44 1 under
HOUSING - RENT W/O UNLET PERIODS 2,354 0 - 0 - 747 727 20 under
HOUSING - RENT W/O BAD PERIODS 3,405 0 - 0 - 145 145 0 -
ASBESTOS 139 0 - 0 - 24 24 0 -
ELECTRICITY  - CONTRACT 1,008 0 - 0 - 106 63 43 under
GAS 301 0 - 0 - 79 98 (19) over
HEATING OIL 54 (7) over (8) over 13 15 (2) over
SOLID FUEL 4 0 - 1 under 1 0 1 under
FIXTURE & FITTINGS 58 (1) over 1 under 16 11 5 under
JANITOR SERVICE 74 7 under 7 under 12 7 5 under
CLEANING CONTRACT 384 (13) over (19) over 96 115 (19) over
CLEANING MATERIALS 60 5 under 8 under 16 4 12 under
WINDOW CLEANING 16 (1) over (1) over 4 3 1 under
PEST CONTROL 122 (4) over (6) over 28 38 (10) over
REFUSE UPLIFT 0 (5) over (7) over 0 11 (11) over
REMOVAL & STORAGE COSTS 14 1 under 1 under 4 (6) 10 under
OTHER PROPERTY COSTS 35 0 - 2 under 9 8 1 under
PROPERTY COSTS 46,906 (9) over (7) over 15,737 15,746 (9) over

Page 185

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 297 0 - 0 - 80 87 (7) over
I.T. EQUIPMENT MAINT-CONTRACT 209 0 - 0 - 0 0 0 -
EQUIPMENT, APPARATUS AND TOOLS 13 1 under 0 - 4 4 0 -
AIDS FOR CLIENTS 0 0 - (1) over 0 2 (2) over
ADAPTATIONS FOR CLIENTS 0 (4) over (9) over 0 0 0 -
FURNITURE - OFFICE 10 (1) over 0 - 3 2 1 under
FURNITURE - GENERAL 0 (1) over (1) over 0 1 (1) over
MATERIALS, APPARATUS AND EQUIPMENT 0 0 - 0 - 0 1 (1) over
FOODSTUFFS - GENERAL 6 1 under (1) over 2 2 0 -
PROTECTIVE CLOTHING & UNIFORMS 12 0 - 0 - 3 3 0 -
LAUNDRY COSTS 16 0 - (1) over 4 5 (1) over
OTHER SUPPLIES AND SERVICES 31 (1) over 0 - 9 11 (2) over
HEALTH AND SAFETY 15 2 under 3 under 4 0 4 under
SUPPLIES AND SERVICES 609 (3) over (10) over 109 118 (9) over
TRANSPORT AND PLANT
POOL CAR RECHARGE - RENTAL CHARGE 26 1 under 0 - 6 4 2 under
POOL CAR RECHARGE - FUEL 6 0 - 1 under 1 0 1 under
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 - 0 - 0 0 0 -
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 23 1 under 1 under 5 3 2 under
FLEET SERVICE CHARGES LEASING 72 0 - 0 - 19 13 6 under
FLEET SERVICE CHARGES HIRED VEHICLES 34 3 under 5 under 8 0 8 under
FLEET SERVICE CHARGES CONTRACT HIRE 0 (1) over (1) over 0 1 (1) over
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 8 0 - 0 - 2 1 1 under
FLEET SERVICE CHARGES FUEL 21 0 - 1 under 5 4 1 under
STORAGE 4 0 - 1 under 1 0 1 under
TRANSPORT AND PLANT 195 4 under 8 under 47 26 21 under

Page 186

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
ADMINISTRATION
PRINTING AND STATIONERY 61 0 - 0 - 16 14 2 under
BULK PRINTING 53 4 under 8 under 12 0 12 under
TELEPHONES 84 4 under (6) over 19 22 (3) over
MOBILE PHONES 27 2 under 4 under 6 0 6 under
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 22 0 - 0 - 0 0 0 -
ADVERTISING - OTHER 12 1 under 2 under 3 0 3 under
POSTAGES/COURIERS 132 0 - 0 - 0 0 0 -
SMS MESSAGING 0 0 - (2) over 0 2 (2) over
MEMBERSHIP FEES/SUBSCRIPTIONS 38 0 - 3 under 15 19 (4) over
MEDICAL COSTS 25 (2) over (5) over 7 12 (5) over
LEGAL EXPENSES 61 0 - 0 - 0 0 0 -
PETTY OUTLAYS 4 0 - 1 under 1 1 0 -
HOSPITALITY / CIVIC RECOGNITION 0 0 - 0 - 0 1 (1) over
GIRO BANK AGENCY FEES 9 1 under 2 under 0 0 0 -
PAYPOINT AGENCY FEES 49 3 under 3 under 7 9 (2) over
INTERNET AGENCY FEES 6 1 under 1 under 2 0 2 under
OTHER ADMIN COSTS 15 (3) over (2) over 4 6 (2) over
CONFERENCES - OFFICIALS 7 1 under 1 under 2 0 2 under
TRAINING 0 0 - 0 - 0 3 (3) over
INTERNAL SUPPORT SERVICES ALLOCATION 5,039 0 - 0 - 1,260 1,260 0 -
ADMINISTRATION 5,644 12 under 10 under 1,354 1,349 5 under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,964 0 - 0 - 601 601 0 -
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 - 0 - 0 0 0 -
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 0 - 0 - 0 0 0 -
PAYMENTS TO OTHER BODIES 32 0 - 0 - 0 0 0 -
PAYMENT TO OTHER BODIES 3,030 0 - 0 - 601 601 0 -
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 80 0 - 1 under 24 23 1 under
PAYMENT TO EXTERNAL CONSULTANTS 20 (4) over (3) over 5 7 (2) over
PAYMENT TO CONTRACTORS 100 (4) over (2) over 29 30 (1) over

Page 187

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/23 2022/23 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
FINANCING CHARGES
INTEREST-DEBT CHARGES 18,325 0 - 0 - 0 0 0 -
I.T. EQUIPMENT LEASING-CONTRACT 67 0 - 0 - 1 1 0 -
CFCR 26,050 0 - 0 - 11,332 11,332 0 -
INTEREST ON REVENUE BALANCES (67) 0 - 0 - 0 0 0 -
FINANCING CHARGES 44,375 0 - 0 - 11,333 11,333 0 -
TOTAL EXPENDITURE 114,773 (9) over 13 under 32,887 32,862 25 under
INCOME
SALES - DEPARTMENTS OF THE AUTHORITY (1,169) 0 - 0 - (360) (360) 0 -
FEES AND CHARGES - GENERAL (4,523) 0 - (9) under rec (570) (570) 0 -
HOUSE RENTS (100,503) 0 - 0 - (25,196) (25,196) 0 -
LOCK UP RENTS (2,589) (8) under rec (8) under rec (647) (639) (8) under rec
COMMISSION 0 0 - 0 - 0 21 (21) under rec
INSURANCE RECOVERIES (250) 0 - 4 over rec 0 (4) 4 over rec
OTHER INCOME (1,789) 0 - 0 - (465) (465) 0 -
REALLOCATION OF SUPPORT COSTS (717) 0 - 0 - 0 0 0 -
YEAR END T/FER TO BALANCE SHEET (2,773) 17 over rec 0 - (924) (924) 0 -
INCOME (114,773) 9 over rec (13) under rec (28,162) (28,137) (25) under rec
NET EXPENDITURE 0 0 - 0 - 4,725 4,725 0 -

Page 188

No embedded text on this page.

Page 189

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 15 July 2022 (No.4)
Social Work Resources
Annual Forecast Annual Budget Actual Variance
Budget for Year Forecast Proportion to Period 4 to 15/07/22
Variance to 15/07/22 to 15/07/22
Service Departments :- £m £m £m £m £m £m
Performance and Support 6.522 6.522 0.000 1.588 1.442 0.146 under
Children and Families 38.782 38.782 0.000 11.757 11.924 (0.167) over
Adults and Older People 164.445 164.445 0.000 40.114 39.707 0.407 under
Justice and Substance Misuse 1.735 1.735 0.000 0.634 0.613 0.021 under
Total Finance and Corporate Resources 211.484 211.484 0.000 54.093 53.686 0.407 under
11

Page 190

Social Work Resources Variance Analysis 2022/23 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 611k under Admin and Clerical Staff – 259k under Performance and
Support - 129k under 
This is a result of vacancies
which are actively being
recruited. 
Adult and Older People -
128k under 
This is a result of Scheduling
assistant vacancies which are
being actively recruited.  
Managerial Support Specialist - (183k)
over 
Adults and Older People
- (247k) over 
The overspend is a result of
turnover being less than
anticipated to date and overtime
spend to cover the scheduling
assistant vacancies in Homecare. 
Justice - 75k under  This is a result of vacancies
which are actively being
recruited. 
Basic Grade Social Workers - 364k
under 
Children and Families -
111k under 
This is a result of vacancies
which are actively being
recruited. 
Adults and Older People
- 289k under 
This is a result of vacancies
which are actively being
recruited.

Page 191

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont) 
Instructors - 116k under  Adults and Older People
- 116k under 
This underspend relates to the
non-filling of vacancies as a
consequence of building based
day services currently not being
fully operational following the
COVID-19 pandemic. 
Care Staff - (66k) over  Children and Families–
(44k) over
The overspend relates to the
requirement to cover shifts using
overtime in the children’s homes
to fulfil staffing rotas. 
Home Carers - 161k under  Adults and Older People
– 161k under 
The underspend is a result of
vacancies actively being
recruited. 
Supplies and
Services 
98k under Catering Contract - 61k under Adults and Older People
- 61k under
This underspend is a
consequence of building based
day services currently not being
fully operational. 
Payments to
Contractors
(197k) over Long Term Care - (200k) over Children and Families -
(200k) over
This overspend is a result of the
continuing requirement for
children’s residential external
school placements.

Page 192

Subjective Head Variance  Subjective line Service / amount Explanation
Income (92k) under
recovered
Fees and Charges - General - (209k)
under recovered 
Adults and Older People
- (209k) under recovered 
In responding to COVID-19,
services in the community are still
working at reduced capacity.
Service user charges have been
adjusted to reflect the services
being delivered, resulting in an
under recovery of income. 
Fees and Charges - Other Local
Authorities - (78k) under recovered 
Adults and Older People
- (77k) under recovered 
Following the pandemic, building
based day care services are still
at reduced capacity. As a result
there is a loss of income from
other local authorities who place
their service users in South
Lanarkshire facilities. 
Charges to Health Boards - 194k over
recovered 
Adults and Older People
- 194k over recovered 
This over recovery reflects
funding for the loss of income as
a result of the response to
COVID-19.

Page 193

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS OVERTIME 0 (1) over (2) over 0 2 (2) over
ADMIN & CLERICAL STAFF - APT&C BASIC 4,547 154 under 161 under 1,219 1,000 219 under
ADMIN & CLERICAL STAFF - APT&C OVERTIME 1 (3) over (6) over 1 13 (12) over
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 795 16 under 22 under 217 184 33 under
ADMIN & CLERICAL STAFF - APT&C NIC 350 7 under 12 under 95 76 19 under
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 21,703 24 under 21 under 5,235 5,260 (25) over
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 48 (45) over (77) over 11 127 (116) over
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 3,533 (13) over (23) over 957 988 (31) over
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 2,344 (7) over (3) over 596 607 (11) over
BASIC GRADE SOCIAL WORKERS BASIC 11,372 113 under 207 under 3,131 2,829 302 under
BASIC GRADE SOCIAL WORKERS OVERTIME 35 (6) over (12) over 7 26 (19) over
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 2,102 18 under 25 under 563 522 41 under
BASIC GRADE SOCIAL WORKERS NIC 1,349 17 under 29 under 361 321 40 under
HOSPITAL SOCIAL WORKERS BASIC 403 8 under 14 under 108 94 14 under
HOSPITAL SOCIAL WORKERS OVERTIME 0 (3) over (7) over 0 10 (10) over
HOSPITAL SOCIAL WORKERS SUPERANNUATION 76 3 under 4 under 20 17 3 under
HOSPITAL SOCIAL WORKERS NIC 46 0 1 under 12 12 0
INSTRUCTORS BASIC 1,563 43 under 69 under 422 328 94 under
INSTRUCTORS SUPERANNUATION 266 6 under 8 under 71 61 10 under
INSTRUCTORS NIC 152 6 under 8 under 41 29 12 under
CARE STAFF - APT&C BASIC 17,085 121 under 210 under 4,602 4,463 139 under
CARE STAFF - APT&C OVERTIME 540 (30) over (69) over 153 284 (131) over
CARE STAFF - APT&C SUPERANNUATION 2,983 (3) over (13) over 802 836 (34) over
CARE STAFF - APT&C NIC 1,674 0 3 under 451 491 (40) over
HOME CARERS BASIC 19,973 (13) over 72 under 5,205 4,944 261 under
HOME CARERS OVERTIME 1,280 (56) over (88) over 235 383 (148) over
HOME CARERS SUPERANNUATION 3,582 (5) over (11) over 918 900 18 under
HOME CARERS NIC 1,937 9 under 17 under 498 468 30 under
TRAVEL AND SUBSISTENCE 376 (26) over (19) over 57 79 (22) over
OTHER EMPLOYEE COSTS 8,221 61 under 6 under 139 154 (15) over
PENSION INCREASES 328 (9) over 9 under 79 72 7 under
ADDITIONAL PENSION COSTS 6 (5) over (15) over 6 21 (15) over
EMPLOYEE COSTS 108,670 381 under 553 under 26,212 25,601 611 under

Page 194

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
PROPERTY COSTS
RATES 401 0 0 0 0 0
SCOTTISH WATER - UNMETERED CHARGES 46 (2) over 1 under 11 14 (3) over
SCOTTISH WATER - METERED CHARGES 194 2 under 0 34 32 2 under
RENT 451 (2) over (5) over 232 231 1 under
SERVICE CHARGE 0 0 2 under 0 2 (2) over
PROPERTY INSURANCE 31 0 0 0 0 0
SECURITY COSTS 3 0 0 1 9 (8) over
GROUND MAINTENANCE 3 0 1 under 1 0 1 under
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 0 (3) over (3) over 0 9 (9) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 55 (4) over 4 under 7 8 (1) over
ELECTRICITY  - CONTRACT 1,129 15 under 8 under 12 7 5 under
GAS 344 (11) over 16 under 109 106 3 under
JANITOR SERVICE 0 0 (1) over 0 0 0
CLEANING CONTRACT 302 (41) over (20) over 297 332 (35) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 115 (1) over 5 under 36 30 6 under
HEALTH & HYGIENE MATERIALS 0 (7) over (6) over 29 48 (19) over
WINDOW CLEANING 13 1 under 0 3 1 2 under
PEST CONTROL 1 0 0 0 0 0
REFUSE UPLIFT 35 6 under 2 under 2 1 1 under
OTHER PROPERTY COSTS 235 (9) over 1 under 56 51 5 under
PROPERTY COSTS 3,358 (56) over 5 under 830 881 (51) over

Page 195

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 669 (1) over (5) over 164 172 (8) over
COMPUTER EQUIPMENT MAINTENANCE 82 4 under 4 under 5 0 5 under
I.T. EQUIPMENT MAINT-CONTRACT 198 0 10 under 10 9 1 under
I.T. ELECTRONIC MESSAGING 250 2 under 5 under 3 0 3 under
EQUIPMENT, APPARATUS AND TOOLS 142 2 under 11 under 29 1 28 under
SMALL TOOLS 1 0 (2) over 0 2 (2) over
AIDS & ADAPTIONS 2,648 (5) over (57) over 381 390 (9) over
SUPPLIES FOR CLIENTS 501 3 under 8 under 102 88 14 under
FURNITURE - OFFICE 0 (2) over (3) over 0 4 (4) over
FURNITURE - GENERAL 13 (3) over 0 3 3 0
FURNISHINGS (INCL. CROCKERY & LINEN) 18 0 1 under 4 3 1 under
MATERIALS 10 (2) over 0 2 3 (1) over
MATERIALS, APPARATUS AND EQUIPMENT 0 0 0 0 1 (1) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC 0 0 0 0 1 (1) over
PROVISIONS - GENERAL 166 2 under 0 40 37 3 under
FOOD PURCHASES WITHIN CONTRACT SERVICE 430 (4) over 9 under 141 139 2 under
BEVERAGES 39 (2) over 1 under 8 8 0
SCHOOL MILK 29 0 0 8 6 2 under
PROTECTIVE CLOTHING & UNIFORMS 213 (28) over (2) over 88 91 (3) over
LAUNDRY COSTS 4 (1) over 0 1 2 (1) over
OTHER SUPPLIES AND SERVICES 161 3 under 5 under 12 5 7 under
CATERING - CONTRACT 434 (1) over 38 under 247 186 61 under
CATERING - OUTWITH CONTRACT 93 6 under 1 under 2 1 1 under
SUPPLIES AND SERVICES 6,101 (27) over 24 under 1,250 1,152 98 under
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 124 (192) over 4 under 18 18 0
POOL CAR CHARGES-FUEL 43 3 under 0 19 14 5 under
POOL CAR CHARGES-ADDITIONAL COSTS 7 0 1 under 1 0 1 under
OTHER TRANSPORT COSTS 807 189 under 2 under 179 181 (2) over
INSURANCE 24 0 0 0 0 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 69 1 under 1 under 24 24 0
FLEET SERVICE CHARGES - ASSET MODIFICATIONS 0 (1) over (1) over 0 1 (1) over
FLEET SERVICE CHARGES - LEASING 406 1 under 2 under 237 238 (1) over
FLEET SERVICE CHARGES - HIRED VEHICLES 24 1 under 0 6 4 2 under
FLEET SERVICE CHARGES - CONTRACT HIRE 7 0 1 under 0 0 0
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 28 2 under 2 under 8 9 (1) over
FLEET SERVICE CHARGES - FUEL 469 2 under 6 under 109 84 25 under
FLEET SERVICE CHARGES - DRIVERS 2,785 0 0 0 0 0
HIRE OF EXTERNAL VEHICLES 7 1 under 1 under 2 0 2 under
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 0 0 (1) over 0 1 (1) over
TRANSPORT AND PLANT 4,800 7 under 18 under 603 574 29 under

Page 196

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
ADMINISTRATION
PRINTING AND STATIONERY 141 1 under 0 20 17 3 under
TELEPHONES 202 (1) over (7) over 54 60 (6) over
MOBILE PHONES 312 2 under 9 under 20 14 6 under
ADVERTISING - RECRUITMENT 4 0 0 0 0 0
ADVERTISING - OTHER 32 2 under 3 under 1 4 (3) over
POSTAGES/COURIERS 99 2 under 7 under 15 15 0
MEMBERSHIP FEES/SUBSCRIPTIONS 42 0 (5) over 5 7 (2) over
INSURANCE 70 0 0 0 0 0
MEDICAL COSTS 37 (1) over (3) over 6 15 (9) over
LEGAL EXPENSES 255 (1) over (24) over 84 83 1 under
HOSPITALITY / CIVIC RECOGNITION 14 0 0 13 13 0
OTHER ADMIN COSTS 44 3 under 0 1 0 1 under
CONFERENCES - OFFICIALS (incl associated costs) 6 1 under 1 under 1 0 1 under
TRAINING 63 2 under 2 under 2 2 0
INTERNAL SUPPORT SERVICES ALLOCATION 410 0 0 0 0 0
ADMINISTRATION 1,731 10 under (17) over 222 230 (8) over
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 347 0 0 0 0 0
OTHER LOCAL AUTHORITIES 30 1 under 2 under 2 0 2 under
GRANTS TO VOLUNTARY ORGANISATIONS 23 0 (6) over 12 12 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 4,363 3 under (53) over 824 809 15 under
PAYMENTS TO OTHER BODIES 4,071 5 under 32 under 743 717 26 under
PAYMENTS TO HEALTH BOARD 0 0 (3) over 0 6 (6) over
INDEPENDENT SCHOOL PLACES 0 (2) over (2) over 0 2 (2) over
PRIVATE INDIVIDUALS - GENERAL 955 (8) over 14 under 248 240 8 under
SOCIAL WORK - FOSTER PARENTS 6,282 0 0 2,028 2,036 (8) over
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 0 0 22 23 (1) over
SOCIAL WORK - ADOPTION ALLOWANCES 650 0 (10) over 325 347 (22) over
DIRECT PAYMENTS 9,056 1 under 5 under 2,755 2,753 2 under
PAYMENT TO OTHER BODIES 25,871 0 (27) over 6,959 6,945 14 under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR - DEFAULT 1,040 (15) over (2) over 252 255 (3) over
PAYMENT TO PRIVATE CONTRACTOR - LONG TERM CARE 59,114 (130) over (155) over 18,214 18,414 (200) over
PAYMENT TO PRIVATE CONTRACTOR - CET ALLOCATION - HOME CARE 33,904 0 0 3,697 3,697 0
PAYMENT TO PRIVATE CONTRACTOR - RESPITE 2,505 0 0 255 255 0
PAYMENT TO PRIVATE CONTRACTOR - DAY CARE 1,180 0 0 146 146 0
PAYMENT TO PRIVATE CONTRACTOR - HOME SUPPORT 21,264 0 0 3,025 3,025 0
PAYMENT TO PRIVATE CONTRACTOR - FREE PERSONAL NURSING CARE 6,812 0 0 1,569 1,569 0
PAYMENT TO PRIVATE CONTRACTOR - DAY RELATED ACTIVITIES INCL RESIDENTIAL PLACEMENTS 3,708 3 under 50 under 854 852 2 under
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 35 0 (48) over 13 15 (2) over
SLC MANAGED 0 6 under 6 under 0 (6) 6 under
PAYMENT TO CONTRACTORS 129,562 (136) over (149) over 28,025 28,222 (197) over

Page 197

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 2 PERIOD 3 PERIOD 4 PERIOD 4 PERIOD 4
BUDGET VARIANCE Over/ VARIANCE Over/ ESTIMATE ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2022/2023 SLC 22/23 2 AMOUNT Under AMOUNT Under TO DATE TO DATE AMOUNT Under
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 3,758 (2) over (5) over 1,366 1,370 (4) over
SECTION PAYMENTS 53 1 under 1 under 12 11 1 under
TRANSFER PAYMENTS 3,811 (1) over (4) over 1,378 1,381 (3) over
FINANCING CHARGES
LEASING CHARGES - FINANCE 1 0 0 0 0 0
LEASING CHARGES - OPERATIONAL 1 0 0 0 0 0
I.T. EQUIPMENT LEASING-CONTRACT 365 (5) over 2 under 16 10 6 under
FINANCING CHARGES 367 (5) over 2 under 16 10 6 under
TOTAL EXPENDITURE 284,271 173 under 405 under 65,495 64,996 499 under
INCOME
NON RELEVANT GOVERNMENT GRANT (8,759) 0 2 over rec (1,645) (1,645) 0
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (24,601) 0 0 (6,148) (6,148) 0
CONTRIBUTIONS FROM OTHER BODIES (5,733) 2 over rec 0 (180) (180) 0
SALES - SALE OF MEALS 0 0 1 over rec 0 (1) 1 over rec
FEES AND CHARGES - GENERAL (5,797) 18 over rec (123) under rec (2,189) (1,980) (209) under rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,007) (30) under rec 71 over rec (150) (72) (78) under rec
CHARGES TO HEALTH BOARDS (26,019) 88 over rec 23 over rec (1,073) (1,267) 194 over rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (233) (2) under rec (5) under rec 0 0 0
RENTAL INCOME (27) 0 0 (7) 0 (7) under rec
OTHER INCOME (211) (4) under rec (4) under rec (10) (17) 7 over rec
REALLOCATION OF SUPPORT COSTS (400) 0 0 0 0 0
INCOME (72,787) 72 over rec (35) under rec (11,402) (11,310) (92) under rec
NET EXPENDITURE 211,484 245 under 370 under 54,093 53,686 407 under

Page 198

No embedded text on this page.