Agenda Document Pack - Financial Resources Scrutiny Forum - 21/11/2024

South Lanarkshire Council · 21 November 2024
Back to Financial Resources Scrutiny Forum — 21 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 13 November 2024 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 21 November 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Grant Ferguson (Chair), Julia Marrs (Depute Chair), Mathew Buchanan, Colin Dewar, Monique
Equi, Ross Gowland, Gavin Keatt, Richard Lockhart, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Financial Resources Scrutiny Forum held on 10
October 2024 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Monitoring 
3a  Capital Budget Monitoring 2024/2025 - General Fund Capital Programme
Report dated 14 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
7 - 28 
3b  Capital Budget Monitoring 2024/2025 - Housing Capital Programme
Report dated 14 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
29 - 36 
4 Revenue Budget Monitoring 2024/2025
Report dated 1 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
37 - 42 
5 Revenue Budget Monitoring 2024/2025 - Detailed Resource Analysis
Report dated 1 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
43 - 88 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

FINANCIAL RESOURCES SCRUTINY FORUM 
Minutes of meeting held via MS Teams and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 10 October 2024 
Chair:
Councillor Julia Marrs (Depute) 
Councillors Present:
Councillor Mathew Buchanan, Councillor Colin Dewar, Councillor Monique Equi, Councillor Gavin
Keatt, Councillor Richard Lockhart, Councillor Carol Nugent 
Councillors' Apologies:
Councillor Grant Ferguson (Chair), Councillor Ross Gowland 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); S Jessup, Administration Assistant; E-A McGonigle,
Administration Adviser; L O’Hagan, Head of Finance (Strategy)
Housing and Technical Resources
D Craig, Property Manager (Commercial) 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Financial Resources Scrutiny Forum held on 12 September
2024 were submitted for approval as a correct record. 
The Head of Finance (Strategy) responded to a member’s question in relation to the Climate
Change, Sustainability and Environmental Implications section of reports. 
The Forum decided: that the minutes be approved as a correct record. 
3a Capital Budget Monitoring 2024/2025 – General Fund Capital Programme 
A report dated 19 September 2024 by the Executive Director (Finance and Corporate
Resources) was submitted on the position of the General Fund Capital Programme 2024/2025
for the period 1 April to 9 August 2024. 
The revised General Fund Capital Programme for 2024/2025 totalled £87.007 million, as
detailed in Appendix B to the report.  The revised programme included adjustments totalling a
net increase of £0.051 million which had been submitted to the Executive Committee on 2
October 2024, as detailed in Appendix A to the report. 
The funding available to support the programme also totalled £87.007 million and was detailed
in Appendix D to the report.  Appendix D also showed the forecast for the financial year of
£87.007 million.
2
3

Page 4

Actual spend incurred to 9 August 2024 totalled £11.296 million.  Actual funding received to 9
August 2024 was £51.662 million, as detailed in Appendix D to the report.  Relevant officers
would continue to closely monitor the generation of all income, including receipts. 
The physical progress achieved with the General Fund Capital Programme 2024/2025 at 9
August 2024 was detailed in appendices E to G to the report. 
The Forum decided: that the position on the General Fund Capital Programme
as at 9 August 2024 be noted. 
[Reference: Minutes of 12 September 2024 (Paragraph 3a) and Minutes of the Executive
Committee of 2 October 2024 (Paragraph 4)] 
3b Capital Budget Monitoring 2024/2025 – Housing Capital Programme 
A report dated 19 September 2024 by the Executive Director (Finance and Corporate
Resources) was submitted on the position of the Housing Capital Programme 2024/2025 for the
period 1 April to 9 August 2024 (Period 5). 
The revised Housing Capital Programme for 2024/2025 totalled £77.248 million, as approved by
the Executive Committee on 26 June 2024.  Programmed funding for the year also totalled
£77.248 million.  The budget, along with a detailed breakdown of the funding sources, was
included in Appendix A to the report. 
The predicted spend position for the Housing Capital Programme for the financial year
2024/2025 was £77.248 million.  Actual funding received at 9 August 2024 was £15.503 million. 
The physical progress achieved with the Housing Capital Programme 2024/2025 at 9 August
2024 was detailed in Appendix B to the report. 
The Forum decided: that the position on the Housing Capital Programme as at 9
August 2024 be noted. 
[Reference: Minutes of 12 September 2024 (Paragraph 3b) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 6) and 2 October 2024 (Paragraph 4)] 
Councillor Keatt left the meeting after this item of business 
4 Revenue Budget Monitoring 2024/2025 
A report dated 23 September 2024 by the Executive Director (Finance and Corporate
Resources) was submitted on the overall financial position of the Council’s General Fund
Revenue Account and Housing Revenue Account for the period 1 April to 9 August 2024 (Period
5), along with a projection for the year to 31 March 2025. 
As at 9 August 2024, the projected outturn position on the General Fund Revenue Account and
Housing Revenue Account was a breakeven position, as detailed in appendices 1 and 2 to the
report respectively. 
Information was provided on the following key budget areas:- 
 teacher numbers
 employer’s pension contribution increase (teachers)
4

Page 5

The Forum decided: 
(1) that the projected breakeven position on the General Fund Revenue Account for
2024/2025 and the actual spend as at 9 August 2024, as detailed in section 4 of the report,
be noted; and 
(2) that the projected breakeven position on the Housing Revenue Account for 2024/2025 and
the actual spend as at 9 August 2024, as detailed in section 5 of the report, be noted. 
[Reference: Minutes of 12 September 2024 (Paragraph 4)] 
5 Revenue Budget Monitoring 2024/2025 – Detailed Resource Analysis 
A report dated 23 September 2024 by the Executive Director (Finance and Corporate
Resources) was submitted comparing actual expenditure against budgeted expenditure for the
period 1 April to 9 August 2024 (Period 5). 
Appendices A to F to the report provided the following information for each Resource and the
Housing Revenue Account:- 
 an Executive Summary showing the top-level position for each of the Services within the
Resource and the Housing Revenue Account as at 9 August 2024
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services as at 9 August 2024
 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings as at 9 August 2024 
Officers responded to a member’s questions in relation to the following:- 
 the overspend related to overtime which was reported under employee costs (Community
and Enterprise Resources), as detailed in Appendix A to the report
 the overspend related to pupil transport which was reported under transport and plant
(Education Resources), as detailed in Appendix B to the report
 the overspend related to independent school places which was reported under payments
to other bodies (Education Resources), as detailed in Appendix B to the report
 the underspend related to grants to voluntary organisations which was reported under
payments to other bodies (Finance and Corporate Resources), as detailed in Appendix C
to the report, and the actions taken to promote those grants to relevant organisations
 the overspend related to other accommodation which was reported under property costs
(Housing and Technical Resources), as detailed in Appendix D to the report
 the overspend related to managerial support specialist staff which was reported under
employee costs (Social Work Resources), as detailed in Appendix F to the report 
Where information was not readily available, the Head of Finance (Strategy) undertook to
provide this to relevant members.  The Chair, on behalf of the Forum, requested that further
information be provided in relation to the underspend on grants to voluntary organisations. 
The Forum decided: that the position as at 9 August 2024 (Period 5) be noted. 
[Reference:  Minutes of 12 September 2024 (Paragraph 5)] 
Councillor Keatt re-joined the meeting during consideration of this item of business 
5

Page 6

6 Urgent Business 
There were no items of urgent business.
6

Page 7

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 21 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Subject: Capital Budget Monitoring 2024/2025 - General Fund
Capital Programme
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2024
to 4 October 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the 2024/2025 General Fund
Capital Programme be noted.
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 4 October 2024 from
both a financial and physical perspective.
3.2. Appendices A to D show the financial position of the General Fund Capital
Programme, with the physical progress detailed in appendices E to G – as they are
split into Build, Non-Build and Roads.
4. General Fund Capital Programme 2024/2025
4.1. 2024/2025 Budget:  The revised Capital Programme for 2024/2025 totals £76.792
4.2
4.3
million as shown in Appendix B. The revised programme includes adjustments to the
programme totalling a net decrease of £9.215 million, as detailed in Appendix A,
which have been submitted to the Executive Committee on 13 November 2024 for
approval.
Transfers to Revenue:  In addition to the adjustments noted at Section 4.1, the
revised programme of £76.792 million also reflects a £1.000 million transfer to the
Revenue Budget for the Private Housing Scheme of Assistance project.  Following a
review of the spend, it has been identified that it cannot be classed as Capital. 
Therefore, the budget of £1.000 million will be transferred to Housing and Technical
Resource’s Revenue budget as agreed by the Executive Committee on 13
November 2024.  
The funding available to support the programme also totals £76.792 million and is
detailed in Appendix D.
3a
7

Page 8

4.4 2024/2025 Forecast:  The programme spend and funding for the General Fund is
summarised in Appendix D.  As noted in 4.1, the total capital spending programme
for the year is £76.792 million.
4.5. Appendix D also shows a forecast for the financial year of £76.792 million.
4.6. 2024/2025 Actual Position:  Actual spend incurred to the 4 October 2024 totals
£17.581 million.
4.7. Actual funding received to 4 October 2024 is £45.336 million.
4.8. Relevant officers will continue to closely monitor the generation of all income
including receipts.
5. Employee Implications
5.1. There are no employee implications as a result of this report.
6. Financial Implications
6.1. The financial implications are included in section 4 of this report.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings.
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report.
Jackie Taylor
Executive Director (Finance and Corporate Resources)
14 November 2024
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
Previous References
 Executive Committee, 13 November 2024
List of Background Papers
 Capital Ledger prints to 4 October 2024
8

Page 9

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
9

Page 10

APPENDIX A
Adjustments Approved by Executive Committee – 13 November 2024
Community and Enterprise Resource
McKirdy Park
Approval is sought to increase the 2024/2025 capital programme by £0.252
million for the redevelopment of McKirdy Park including play area, community
garden and outdoor gym.
The funding package is comprised as follows:
 Renewable Energy Fund (£0.101m)
 Broken Cross Community Benefit (£0.055m)
 Cumberhead Wind Farm Community Benefit (£0.020m)
 Kype Muir Community Benefit (£0.025m)
 Lesmahagow Development Trust (£0.040m)
 Auchrobert Community Energy Society (£0.003m)
 Lesmahagow Community Council (£0.0005m)
 MyPark Scotland Public Fundraising (£0.008m)
Larkhall Leisure Centre
The 2024/2025 includes budget of £1.742 million to be spent this financial year on
Larkhall Leisure Centre. Meetings with Hub South West have identified forecast
expenditure of £0.715 million on this project by end of March 2025.
Approval is therefore sought to slip £1.027 million into financial year 2025/2026 to
reflect the timescales for this project. 
Place Based Investment Funding 2024/25
Funding from the Scottish Government of £0.589 million has been confirmed for
the next phase of the Place Based Investment Programme.  The purpose of this
funding is to support existing projects where commitments are in place, and the
following projects have been agreed with the Scottish Government to use the
funding in 2024/2025:
 Discover Lanark Outdoor Space: The project in conjunction with Lanark BID
will create a high-quality outdoor seating area in Lanark to support a vibrant
and attractive town centre.
 Coalyard: Town Centre Social Housing development bringing much needed
development to the town centre and improving town centre living.
Approval is therefore sought to increase the 2024/2025 Capital Programme by
£0.589 million for these projects.  
City Deal – Secondary Schools
Work on the expansion proposals for the secondary schools is ongoing with Hub
South West (the subject of a separate report to this Committee).  The target
£0.252m 
(£1.027m)
£0.589m
10

Page 11

programme for the projects is for a construction start in summer 2025 with only
early design work required in 2024/2025.
Approval is therefore sought to slip £4.711 million into financial year 2025/2026 to
reflect the revised timescales of these projects. 
The reduction to the current year programme is spilt between budget held in the
City Deal programme (£3.458 million) and Education Resources (£1.253 million).
In addition, internal adaptation/reconfiguration works at Stonelaw High School are
being planned, to create 3 classrooms for the new school year in August 2025.
Approval is therefore sought to increase the 2024/2025 Capital Programme by
£0.400m, utilising Developers Contributions, and slip £0.350m of this into financial
year 2025/2026 to reflect the delivery timescales for the project.
Leisure and Culture Transformation Fund
An initial programme of works totalling £8.4 million have been identified for phase 1.
The current estimate of expenditure during 2024/2025 is £3.5 million on works and
direct purchases by South Lanarkshire Leisure and Culture.
Approval is therefore sought to slip £4.9 million into financial year 2025/2026 to
reflect the revised profile of expenditure across financial years. 
(£4.711m)
£0.400m
(£0.350m)
(£4.900m)
Education Resource
Universal Free School Meals 2024/25
Funding from the Scottish Government of £0.332 million has been confirmed to
support the phased expansion of free school meals in primary schools. The
purpose of this funding is to support school infrastructure, including school
catering and dining, ahead of further expansion of free lunches for primary school
children.
Approval is therefore sought to increase the 2024/2025 Capital Programme by
£0.332 million.  
Law Primary School Nursery Expansion
Approval is sought to increase the 2024/2025 capital programme by £0.200
million for the adaptation of Law Primary School and School Nursery to increase
nursery registration numbers.  
The funding for this project will come from a Developers Contribution in the
Clydesdale area.
£0.332m
£0.200m
TOTAL ADJUSTMENTS (9.215m)
11

Page 12

APPENDIX B 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024 
£m  
Total Base Budget (including carry forward from 2023/2024) 
Transfers to Revenue – Section 4.2
87.007 
(1.000)  
Proposed Adjustments – Period 7 (9.215) 
Total Revised Budget 76.792     
2024/25
Budget 
Period 7
Proposed
Adjustments 
Revised
2024/25
Budget
Resource £m £m £m    
Community & Enterprise 62.223 (8.544) 53.679
Education 9.042 (0.671) 8.371
Finance & Corporate 3.086 - 3.086
Housing & Technical 11.629 (1.000) 10.629
Social Work 1.027 - 1.027    
TOTAL CAPITAL PROGRAMME 87.007 (10.215) 76.792         
12

Page 13

APPENDIX C 
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024 
Resource Name 
Annual
Budget
£000 
2023/24
C/F
£000
Previous
Slippage
/Adjs
£000
Total
Original
Budget
£000 
Proposed
Adjs
£000 
Proposed
Slippage
£000 
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
1,380 1,478 (12) 2,846 252 0 3,098 3,098 - 663
Enterprise &  
Sustainable Dev
18,460 4,769 5,329 28,558 8,097 (9,385) 27,270 27,270 - 2,292
Roads, Transport
& Fleet
11,798 4,995 2,377 19,170 4,150 (9) 23,311 23,311 - 6,238
Resource 
Total 31,638 11,242 7,694 50,574 12,499 (9,394) 53,679 53,679  - 9,193           
Education
Growth /
Accommodation
Pressures
5,531 (2,084) 2,316 5,763 1,373 (1,603) 5,533 5,533 - 3,412
ICT
Developments
1,600     38 - 1,638 0 0 1,638 1,638 - 787
Free School
Meals
0 308 (78) 230 332 0 562 562 - 103
Education Other 0 480 123 603 35 0 638 638 - 351
Resource 
Total 7,131 (1,258) 2,361 8,234        1,740 (1,603) 8,371 8,371  - 4,653           
Finance & Corporate
IT Services 2,246 684 156 3,086 0 0 3,086 3,086 - 2,334
Resource 
Total 2,246 684 156 3,086 0 0 3,086 3,086  - 3,086           
Office Accom 5,852 3,742 (919) 8,675 0 0 8,675 8,675 - 901
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 (1,000) 0 0 0 - 0
Other Housing 304 29 921 1,254 700 0 1,954 1,954 - 34
Resource 
Total 7,156 3,771 2 10,929 (300) 0 10,629 10,629  - 935  
Social Work
Alarms / SWIS
Plus
1,341 (318) 4 1,027 0 0 1,027 1,027 - 466
Resource Total 1,341 (318) 4 1,027 0 0 1,027 1,027  - 466           
Overall Total 49,512 14,121 10,217 73,850 13,939 (10,997) 76,792 76,792  - 17,581 
13

Page 14

APPENDIX D
SOUTH LANARKSHIRE COUNCIL
CAPITAL EXPENDITURE 2023/24
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024
2024/25
Original
Estimate
inc C/F
2024/25
Revised
Budget
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25
Actual to
04/10/24
Expenditure £m £m £m £m £m
General Fund Programme 73.850 76.792 76.792 - 17.581
Income
2024/25
Budget
2024/25
Revised
Budget
2024/25
Actual
To
04/10/24 
£m  £m £m
Prudential Borrowing 32.564 23.251 23.251
Developers Contributions 8.800 7.736 0.000
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund,
Cycling Scotland, Transport Scotland
and REF / Wind Farms)
0.958 5.233 0.446
Scottish Government:
- Capital Grant 20.156 22.278 12.465
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant)
- Road Safety Improvement
1.440
0.000
0.000
0.497
0.000
0.000
- Vacant and Derelict Land 1.793 1.793 1.368
- Regeneration Capital Grant 2.170 2.170 0.997
- Place Based Investment
Programme
- Universal Free School
Meals
0.727
0.000
1.056
0.322
0.727
0.000
Shared Prosperity Fund 2.645 2.649 0.000
Levelling Up Fund 0.000 7.400 2.839
Capital Receipts 1.340 1.340 2.286
Specific Reserves 1.257 0.957 0.957
Revenue Contribution 0.000 0.000 0.000
TOTAL FUNDING 73.850 76.792 45.336
14

Page 15

Appendix E
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2024/25
BUILD EXECUTIVE SUMMARY
PERIOD ENDED 4 OCTOBER 2024 (PERIOD 7)
Expenditure Periods
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status
Projects Complete  - 1 1 6 9 17 23 - - - - - - -
Projects on Programme - 85 92 102 99 105 104 - - - - - - -
Projects Behind
Programme 
- 0 0 0 0 0 2 - - - - - - -
Projects Altered Brief/
Programme 
- 2 2 2 1 1 1 - - - - - - -
Projects Held - 15 14 23 24 33 33 - - - - - - -
- 103 109 133 133 156 163 0 0 0 0 0 0 0
Project Status 
Design Feasibility - 43 49 73 71 88 88 - - - - - - -
Sketch Design  - 1 1 1 1 4 4 - - - - - - -
Detailed Design - 0 0 0 0 0 0 - - - - - - -
Production Information - 9 9 8 8 8 9 - - - - - - -
Tendering  - 24 24 25 26 23 24 - - - - - - -
On Site - 25 25 20 18 16 15 - - - - - - -
Complete - 1 1 6 9 17 23 - - - - - - -
- 103 109 133 133 156 163 0 0 0 0 0 0 0
15

Page 16

Appendix E
(Page 2)
General Services Capital Programme 2024/25 
Build Variance Explanations 
Project Name Status Variance Explanation
Holy Cross High School
Expansion
Behind Programme  This project is behind programme
due to the timing of expansion
proposals for the secondary schools. 
Uddingston Grammar - Phase 3  Behind Programme  This project is behind programme
due to the timing of expansion
proposals for the secondary schools. 
16

Page 17

Appendix F
(Page 1) 
GENERAL FUND CAPITAL PROGRAMME 2024/25                     
NON BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 4 OCTOBER 2024 (PERIOD 7) 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Number of Projects           
Carried Forward 23/24
Programme - - 31 31 31 31 31       
Approved from 24/25
Programme - - 5 5 5 5 7       
Total Projects Currently
Reported - - 36 36 36 36 38       
Number of Projects                           
Projects Completed - - 2 2 2 2 6       
Projects Ahead of
Programme - - 0 0 0 0 0       
Projects on Programme - - 34 34 34 34 30       
Projects Behind
Programme - - 0 0 0 0 2                      
Projects, Altered
Brief/Programme - - 0 0 0 0 0       
Projects On Hold  - - 0 0 0 0 0     
- - 36 36 36 36 38       
17

Page 18

Appendix F
(Page 2)
General Services Capital Programme 2024/25
Non-Build Executive Summary – Project Status 
Project Status
SLLC - Booking and Admission System On programme
Philipshill Cemetery - Extension  Complete
Ash Die Back On programme
Langlands Boardwalk On programme
Bin Storage Areas On programme
Nature Restoration Fund Complete
Renewal of Play Parks On programme
Greenhall Replacement Bridge On programme
White Bridge Replacement, Chatelherault Country Park (cost design) On programme
McKirdy Park On programme
Alexander Hamilton Memorial Fountain - Stonehouse Park On programme
Douglas Primary School - Floodlights Complete
Calderglen Country Park - One Way System & Infrastructure On programme
Three Rivers / Clydesdale Way On programme
East Kilbride Town Centre Masterplan On programme
Rural Development Centre - Lanark  On programme
SLC Industrial Infrastructure - Energy Efficiency  On programme
Carnwath Community and Business Enterprise HUB On programme
Carluke High Mill Community Facility On programme
Shawfield Remediation and Development On programme
Kirktonholme Pitches Complete
Biggar Youth Project Complete
Cambuslang Streetscape - Phase 2 Complete
Coalyard Housing On programme
Outdoor Space - Lanark On programme
Hamilton Town Centre Masterplan On programme
New Cross Shopping Centre On programme
Vacant & Derelict Land Behind programme
Schools ICT On programme
IT Infrastructure Refresh On programme
Oracle Upgrade On programme
Digital Transformation Review Fund On programme
Public Switch Telephone Network / Alarms (Analogue to Digital) On programme
Lock Up Areas  On programme
Gypsy Travellers Sites On programme
Central Energy Efficiency Fund  On programme
Community Alarms On programme
Replacement SWISS Plus IT System Behind programme 
18

Page 19

Appendix F
(Page 3)
General Services Capital Programme 2024/2025
Non Build Variance Explanations
Project Name Status Variance Explanation
Vacant and Derelict Land –
Langlands West
Behind Programme This project is behind
schedule due the timing of
concluding works at
Greenhills Road which this
project is dependent on
completion for remediation
works to commence. 
Replacement SWISS Plus IT
System
Behind Programme The project is behind
schedule due to the
requirement for additional
data migration works.
19

Page 20

Appendix G
(Page 1) 
GENERAL SERVICES CAPITAL PROGRAMME 2024/25 
ROADS EXECUTIVE SUMMARY 
PERIOD ENDED 4 OCTOBER 2024 (PERIOD 7)                             
1 2 3 4 5 6 7 8 9 10 11 12 13              
Number of Projects             
Total Projects Currently Reported - - 166 172 183 185 185                    
Programme Status             
Projects Complete - - 31 39 53 74 82                    
Projects on Programme - - 135 133 128 103 95                    
Projects Behind Programme - - 0 0 0 0 0                    
Projects, Altered Brief / Programme - - 0 0 0 0 0                    
Projects Still to Commence - - 0 0 2 8 8                     
- - 166 172 183 185 185                    
Project Status             
Briefing - - 32 28 24 13 13                    
Production Information - - 82 77 87 68 67                    
Billing - - 0 0 0 0 0                    
Tendering - - 3 3 5 4 4                    
On Site - - 18 25 14 26 19                    
Complete - - 31 39 53 74 82                     
- - 166 172 183 185 185       
20

Page 21

Appendix G
(Page 2) 
General Services Capital Programme 2024/2025 
Roads Variance Explanations 
Project Name Status Variance Explanation 
Hamilton Area
Footways 
Castle Avenue, Bothwell (Phase 1) 
Castle Avenue, Bothwell (Phase 2) 
Haddow Street, Hamilton 
Woodside Walk, Hamilton 
Lowther Crescent, Stonehouse 
Limekilnburn Road, Quarter 
Held
Held
Held
Held
Held
Held 
These schemes have been deferred to
2025/2026. A greater programme of
works is being developed for 2025/2026 in
order to achieve better value. 
21

Page 22

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 7
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Marchmont Gardens/Failford Road, Strathaven 1 1
Hawthorn Terrace, East Kilbride 1 1
Mount Cameron Drive South and Easdale, East Kilbride 1 1
Stewartfield  Crescent, East Kilbride 1 1
A749 Glasgow Road , East Kilbride (Kingsgate) 1 1
Telford Road, East Kilbride 1 1
Livingstone Drive, East Kilbride 1 1
Troon Avenue, East Kilbride 1 1
Angus Place and Semphill Gardens, East Kilbride 1 1
Stobo, East Kilbride 1 1
Kype Highway / High Kype Road, Strathaven 1 1
Loch Assynt, East Kilbride 1 1
Glasgow Road Service Road, Rutherglen 1 1
Village Road, Cambuslang 1 1
Langlea Road, Rutherglen 1 1
Wellshot Drive, Cambuslang 1 1
Main Street, Rutherglen 1 1
Drainage Action Plan 1 1
Surface Dressing/Preventative Maintenance Schemes
Ardochrig Highway, Auldhouse 1 1
Bents Road, Chapelton 1 1
Burn Highway, Chapelton 1 1
Cairnmuir Road, East Kilbride 1 1
Hairshaw Highway, Strathaven 1 1
Waterhead Peelhill Highway between A71 & B743 1 1
Waterhead Peelhill Highway between A71 & B744 1 1
Preparatory works 24/25 (Patching and drainage) 1 1
Preventative maintemance (Rhinophalt / prep patching) 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title
22

Page 23

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 7
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching
Newton Station Road, Halfway 1 1
Glen More EK North 1 1
Tewkesbury Road EK 1 1
Buchandyke Road EK 1 1
Capel Grove, EK 1 1
Parking Area Shaftsbury Court EK 1 1
Rockhampton Avenue EK 1 1
Inglis Place, EK  1 1
Craigend Road. 1 1
Castleview Road, Strathaven 1 1
WP Highway, Gilmourton 1 1
St Annes Well, Strathaven 1 1
Crutherland Highway 1 1
Millwell Road, Auldhouse 1 1
Churchill Avenue, EK 1 1
Kirktonholme Road, EK 1 1
Kirktonholme Road, EK 1 1
Quarry Road at Stroud Road 1 1
Stroud Road near column R59 1 1
Eaglesham Road at train station 1 1
Eaglesham Road RAB with Peel Road 1 1
Shawfield Drive, Rutherglen 1 1
Elder Crescent, Cambuslang 1 1
Greenhill Road, Rutherglen 1 1
Main Street, Rutherglen 1 1
Stonelaw Road, Rutherglen 1 1
Footways
Stewartfield Crescent, East Kilbride 1 1
Kirk Street, Strathaven 1 1
Caribou Green, Three Rivers Walk, East Kilbride (Slabs to asphalt) 1 1
Dovecastle Drive, Strathaven 1 1
Machline, East Kilbride (Slabs to asphalt) 1 1
Steps at railway solum - East Mains Road, Rosslyn Ave and Glamis Drive 1 1
Cathcart Road, Rutherglen 1 1
Curtis Avenue, Rutherglen 1 1
Stonelaw Road, Rutherglen 1 1
23

Page 24

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 7
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Hamilton Area
Strategic Schemes 
Muttonhole Road (Phase 2) 1 1
Lanark Road, Rosebank, Larkhall 1 1
Drygate Street, Larkhall 1 1
A72, Lanark Road, Highlees, Larkhall 1 1
Campbell Street, Hamilton 1 1
Strategic Infrastructure  (Drainage Schemes)
Summerlee Road, Larkhall 1 1
Green Street, Stonehouse 1 1
Meikle Earnock Road, Hamilton 1 1
Millheugh Road, Larkhall 1 1
Boag Road, Stonehouse 1 1
Preventative Maintenance Schemes
Palace Grounds Road, Hamilton (*TRIAL*) 1 1
Auchentibber Road, Blantyre 1 1
Sandford Road (Phase 1), Stonehouse 1 1
Boghead Highway, Hamilton 1 1
2025/26 Schemes - Preparatory Patching 1 1
Strategic Patching
Swisscott Avenue, Hamilton 1 1
Wellcroft Road, Hamilton  1 1
A72, Lanark Road, Dalserf 1 1
Burnhouse Road, Hamilton 1 1
Woodlands Avenue, Bothwell 1 1
Morven Avenue, Blantyre 1 1
Palace Grounds Road, Hamilton 1 1
Caird Street, Hamilton 1 1
Townhead Street, Hamilton 1 1
Millheugh Brae, Larkhall 1 1
Candermill and Marlage Road, Larkhall 1 1
Glenburn Avenue, Stonehouse 1 1
Third Road, Blantyre 1 1
Bothwell Road, Uddingston 1 1
Parkneuk Road, Blantyre 1 1
Newhousemill Road, Hamilton 1 1
Muttonhole Road / Highstonehall Road 1 1
Muir Street, Hamilton 1 1
Grier Place, Larkhall 1 1
Brankholm Brae, Hamilton 1 1
Millheugh Road, Larkhall 1 1
24

Page 25

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 7
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Footways
Nairn Avenue, Blantyre 1 1
Station Road, Blantyre 1 1
Chestnut Grove, Blantyre 1 1
Craigmuir Road, Blantyre 1 1
Anderson Street / Stewart Street, Hamilton 1 1
Darngaber Gardens, Quarter 1 1
Castle Avenue, Bothwell (Phase 1) 1 1
Castle Avenue, Bothwell (Phase 2) 1 1
Haddow Street, Hamilton 1 1
Woodside Walk, Hamilton 1 1
Lowther Crescent, Stonehouse  1 1
Limekilnburn Road, Quarter 1 1
Covanburn Avenue, Hamilton 1 1
Clydesdale Area
Strategic Schemes 
A706 Harelaw Roundabout 1 1
A73 Lanark Road, Carluke 1 1
A72 Lanark Road, Crossford 1 1
B715 Climpy Road. Forth 1 1
B7016 Forth to Braehead 1 1
A70 Hazelside to Glespin 1 1
Glenafeoch Road, Carluke 1 1
C4 from Kilncadzow to Lanark (Cartland) 1 1
C37 Harelaw 1 1
B797 Leadhills 1 1
B7018 Lesmahagow Road, Kirkfieldbank 1 1
Roman Court, Cleghorn 1 1
B7078 Carlisle Road, Lesmahagow 1 1
Smyllum Road, Lanark 1 1
Jerviswood Road/North Vennel, Lanark 1 1
Orchard Street/Mill Road, Carluke (Sheltered Complex) 1 1
B7016 Libberton to Brownhill Farm 1 1
C1 Mauldslie Road 1 1
Luggie Road/Weighouse Road, Carluke 1 1
B7078 Carlisle Road, Blackwood 1 1
A70 Pretsmill 1 1
The Cut, Lesmahagow 1 1
Gallowhill Road, Lanark 1 1
Boghall Road, Carluke 1 1
Strategic Infrastructure  (Drainage Schemes)
C4 Moor Road, Carland 1 1
A73 Hyndford Rd - Turning of the staff/Sensory Gardendford Road 1 1
25

Page 26

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 7
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Preventative Maintenance Schemes
B797 New Glendorch, Leadhills 1 1
B797Broadlaw Kennels, Leadhills 1 1
Mill Road, Dolphinton 1 1
Libberton Muir Road 1 1
Greenshields Road, Biggar 1 1
Hillhead Road, Covington 1 1
A73 Meadowfoot Road, Covington 1 1
A70 Redford Bridge 1 1
Preparatory patching, various locations 1 1
Strategic Patching
Strategic/Machine Patching, Classified Road mainly 1 1
Footways
Roman Court, Cleghorn 1 1
Forrest Road, Lanark 1 1
B7078 Milton 1 1
Violet Bank 1 1
PARTICIPATORY BUDGET
Clydesdale Area
Footways
St Leonard Steet, Lanark 1 1
ROADS REFURBISHMENT BUDGET
Structures projects
East Kilbride line electrification – Maintenance/refurb of four SLC structures 1 1
Duke Street MSCP – Next phase (3) of the structural appraisal 1 1
Burnhouse Bridge by Auldhouse – refurbishment and repair 1 1
Cornwall Street Footbridge, East Kilbride – assessment of half joints 1 1
Priestburn Bridge – refurbishment and repair 1 1
Elvanfoot Bridge – bridge refurb & installation of high containment kerbing 1 1
Traffic and Transportaion
Minor works ~ various lining & signing works 1 1
Vehicle Activated Signs ~ Upgrades 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure 1 1
BRIDGES
Clyde Bridge ~ Replacement of existing structure 1 1
26

Page 27

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 7
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
20mph/30mph ROAD AND PLACE CRITERIA ASSESSMENT
Road assessments for speed limits in appropriate areas 1 1
PARK AND RIDE PROJECTS
Hairmyres P & R 1 1
CYCLING SCOTLAND
Cycle shelters at schools 1 1
SCOTTISH GOVERNMENT TIER 1 FUNDING (FORMERLY CWSR)
Active Travel Routes
Pedestrians and cyclists facilities as part of Hairmyres Station project. 1 1
Pedestrian and cycle improvements
Ph.2 ~ Burnbank Road near West Stewart Street 1 1
Junction Upgrade
Eaglesham Road east of Redwood Drive 1 1
Eaglesham Road west of Redwood Drive 1 1
Redwood Drive 1 1
Greenhills Road 1 1
LOCAL AUTHORITY DIRECT AWARD
High Common Road ped crossing upgrade 1 1
Main Street/Nairn St. Blantyre ped crossing upgrade 1 1
Main Street/Broompark, ped crossing upgrade 1 1
Cadzow Sreet ped crossing upgrade (toucan) 1 1
Portland Square, ped crossing upgrade 1 1
Cycle counter upgrades 1 1
ROAD SAFETY IMPROVEMENT FUND
A70,  from A73 Hyndford Rd to A743 Ravenstruther 1 1
A726, from Torrance Roundabout to Strathaven 1 1
A706, Forth to council boundary 1 1
Hillhouse Road/ Technology Avenue, Hamilton 1 1
A71 Ayr Road nr. Burnhead Road, Shawsburn 1 1
CITY DEAL PROJECTS
Cathkin ~ Loss of value and Noise Insulation Regulations surveys 1 1
Stewartfield Way 1 1
Greenhills/Strathaven Road 1 1
13 67 0 4 19 82 82 95 0 0 8
27

Page 28

28

Page 29

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 21 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Subject: Capital Budget Monitoring 2024/2025 - Housing Capital
Programme
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April to 4
October 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted.
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 4 October 2024 from
both a financial and physical perspective.
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B.
4. 2024/25 Housing Capital Programme
4.1. 2024/25 Budget:  The revised Housing Capital Programme for the year is £77.248 million
as approved by the Executive Committee on 13 November 2024.
4.2. Programmed funding for the year also totals £77.248 million.  The budget, along with a
detailed breakdown of the funding sources is included in Appendix A to this report.  
4.3. 2024/2025 Forecast:  As noted in 4.1, the total capital spending programme for the year
is £77.248 million.  Current estimates from Housing and Technical Resources have
identified an outturn of £72.106 million for the year.
4.5. 2024/2025 Actual Position:  Spend to 4 October 2024 on the Housing Capital
Programme amounts to £22.439 million.  
4.4. Affordable Housing Supply Programme: The Scottish Government have confirmed an
additional £1.724 million in Resource Planning Assumption (RPA) for 2024/2025.  The
total allocation of £24.558m is for both the Council and Registered Social Landlords
(RSL) projects in 2024/2025.  As a result of the element allocated to RSLs as grant for
projects, £0.324m of this is additional funding for the Council.
3b
29

Page 30

4.5. The Affordable Housing budget for 2024/2025 is £43.742 million.  The current estimated
outturn for the financial year is £38.600 million, an underspend of £5.142 million.  This is
a result of delays in site starts at Cairnswell Avenue, Cambuslang and Brackenhill Farm,
Hamilton.  In addition, the average purchase price for properties purchased through the
Market Purchase Scheme has reduced reflecting the current size of properties.
4.6. Given the estimated outturn for the year, the budget will not be increased by the additional
£0.324 million of Scottish Government funding.  Instead, the total allocation of Scottish
Government Grant will be claimed in full this financial year (including the additional £0.324
million noted above), with the underspend reflected in the lower level of borrowing
required.  Opportunities continue to be explored to utilise the uncommitted £5.142m in
the current programme.  Any Council funding not utilised in year (borrowing) will carry
forward into the next financial year.  
5. Employee Implications
5.1. There are no employee implications as a result of this report.
6. Financial Implications
6.1. The financial implications are detailed in section 4 of this report.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings.
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a change
to existing policy, function or strategy and therefore no impact assessment is required.
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report.
Jackie Taylor
Executive Director (Finance and Corporate Resources)
14 November 2024
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
Previous References
 Executive Committee, 13 November 2024
List of Background Papers
 Capital Ledger prints to 4 October 2024
30

Page 31

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
31

Page 32

APPENDIX A
SOUTH LANARKSHIRE COUNCIL
CAPITAL EXPENDITURE 2024/25
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024
2024/25
Annual
Budget
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25
Actual to
04/10/24
£m £m £m £m
Expenditure
2024/25 Budget 77.248 72.106 - 22.439
2024/25
Annual
Budget
2024/25
Actual to
04/10/24
£m £m
Income
Capital Receipts 0.000 0.265
Capital Receipts – Land Sales 0.000 0.000
Capital Funded from Current Revenue 33.506 13.815
Prudential Borrowing 23.677 2.563
Scottish Government Specific Grant:
- New Build 16.945 5.311
- Open Market Purchase Scheme 3.000 0.000
- Mortgage to Rent 0.120 0.263
Other Income 0.000 0.222
77.248 22.439
32

Page 33

Appendix B
(Page 1)
HOUSING CAPITAL PROGRAMME 2024/2025
EXECUTIVE SUMMARY
PERIOD ENDED 4 OCTOBER 2024
Expenditure Periods
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status
Projects Complete  - 5 5 15 17 23 26 - - - - - - -
Projects on Programme - 112 112 104 104 107 107 - - - - - - -
Projects Behind
Programme 
- 8 5 4 1 2 0 - - - - - - -
Projects Altered
Brief/Programme
- 2 6 5 3 2 2 - - - - - - -
Projects Held - 21 22 24 27 27 26 - - - - - - -
- 148 150 152 152 161 161 0 0 0 0 0 0 0
Project Status
Design Feasibility - 58 59 55 54 57 55 - - - - - - -
Sketch Design  - 4 4 2 2 2 2 - - - - - - -
Detailed Design  - 2 2 2 2 3 4 - - - - - - -
Production Information - 9 9 13 12 11 10 - - - - - - -
Tendering - 45 45 42 40 33 32 - - - - - - -
On Site  - 25 26 23 25 32 32 - - - - - - -
Complete - 5 5 15 17 23 26 - - - - - - -
- 148 150 152 152 161 161 0 0 0 0 0 0 0
33

Page 34

Appendix B
(Page 2)
Housing Capital Programme 2024/2025
Build Variance Explanations
Project Name Status Variance Explanation
- - -
34

Page 35

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 24/25 0 5.05 10.075 11.562 15.333 19.462 22.099 28.12 34.141 40.162 46.183 52.204 58.225 77.303
Revised Budget 24/25 0 5.05 10.075 11.647 15.503 19.717 22.439 28.545 34.651 40.757 46.863 52.969 59.075 77.248
Actual 24/25 0 5.05 10.075 11.647 15.503 19.717 22.439 0 0 0 0 0 0 0
0
10
20
30
40
50
60
70
80
90
£ Millions
HRA Capital Expenditure Profile Graph 24/25
35

Page 36

36

Page 37

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 21 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Subject: Revenue Budget Monitoring 2024/2025
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Forum of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the
actual spend position for the period 1 April 2024 to 4 October 2024
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2024/2025, and the actual spend as at 4 October 2024 (section 4 and
Appendix 1), be noted; and
(2) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 4 October 2024 (section 5 and Appendix
2 of the report), be noted.
3. Background
3.1. This overview report will summarise the projected outturn for 2024/2025 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section 5).
It will also provide the actual spend as at 4 October 2024.
4. General Services 2024/2025 Projected Outturn as at 4 October 2024
4.1. As at 4 October 2024, the projected outturn position for 2024/2025 on the General
Services budget is break-even (Appendix 1).
4.2. Section 4.3 onwards provides detail on a number of key budget areas.
4.3. Teacher Numbers:  As previously reported, in relation to 2024/2025, the Council
has received notification that the allocation of funding for teacher numbers of £145.5
million for 2024/2025 will be distributed via Specific Resource Grants, and those
grants will be conditional on councils agreeing at the outset to maintain teacher
numbers.  Our share of the £145.5 million funding is £9.379 million. Scottish
Government have indicated that they will consider mitigations presented by councils
for reducing teacher numbers, but we will not know if mitigations will be acceptable
until much later in the year.  
4.4. The Scottish Government have responded to communication from Council officers
continuing to reiterate that any mitigations would be considered on a case-by-case
basis, but they will not be in a position to agree any mitigations in advance of the
teacher number census publication (December 2024).  This position was reiterated
4
37

Page 38

by Scottish Government officials at a meeting with Council officers on 27 August
2024.  At the meeting, officers explained the Council’s various mitigations in detail,
and undertook to provide these in writing to the Scottish Government to provide
context to the census information when this is complete.   
4.5. The initial submission of the teachers’ census position has been submitted, but a
response from Scottish Government remains outstanding at this time. The final
position is expected to be reported early December 2024. 
4.6. Employers Pension Contribution Increase (Teachers):  As advised previously, on
1 April 2024, the Council’s pension contribution for Teachers’ Pensions was
increased from 23% to 26% of basic pay.  The cost to the Council is an estimated
£5.5 million.  The Scottish Government has agreed to provide the related
consequentials.  Latest information from Cosla suggests that the final figure will be
confirmed imminently for 2024/2025 and on a recurring basis to support the increase
in employer contributions to teachers’ pensions.  It has been agreed that 2024
teacher numbers are used for the distribution of this funding, as this most accurately
represents the SNCT workforce population across local government. This funding
will be paid as a redetermination to the General Revenue Grant in March 2025. 
2024/2025 Early Outturn
4.7. 2024/2025 Pay Award:  The Council’s Budget for 2024/2025 included an initial pay
award assumption for non-teachers from 1 April 2024 and for teachers from mid-
August 2024.  This was augmented by the UK Government Consequentials monies
(£3.7 million) which were set aside for pay awards.  The pay award for 2024/2025
has now been implemented and the cost of the award can be managed within the
pay assumptions for 2024/2025.  As we prepare for the 2025/2026 Budget and Pay
Award, the in-year (2024/2025) Consequentials funding of £3.6 million will be set
aside to contribute to the 2025/2026 Pay Award costs.  This is included in a further
report to this Committee (2025/2026 Revenue Budget Gap and Savings).   
4.8. Utilities: As noted in June 2024, recent information has suggested a downward trend
in utilities’ prices into 2024/2025 and this allowed a benefit to the 2025/2026 Strategy
of an estimated £2.000 million as at 2024/2025. The Council is a member of the buying
consortium who purchase wholesale energy in advance, on behalf of ourselves and
other public sector bodies.  This will materialise as an in-year underspend. 
4.9. Council Tax:  The Council Tax Budget for 2024/2025 assumed the impact of new
build properties during 2023/2024 and an estimate into 2024/2025.  Given the
current economic climate, and the potential risk that development would not progress
as originally anticipated, the budget estimates included a prudent assumption re
development numbers, and also that the arrears collection would not continue at the
current levels.  An early outturn has been completed on the 2024/2025 Council Tax
budget.  This is showing an estimated over-recovery of Council Tax income of £3.3
million for 2024/2025.  This reflects an even better level of arrears collection than
previously experienced, and also shows an increase in property numbers over and
above the budgeted level.  This will materialise as an in-year underspend. 
4.10. The total underspend in relation to this early outturn work is £5.9 million.  While these
figures are significant, it is acknowledged that at the time of writing, neither the UK
Government nor the Scottish Government Budgets have been released for
2025/2026.  As a consequence, the Council has no certainty on its financial
settlement for 2025/2026.  The Council will not know its financial Settlement for
2025/2026 until after the UK Government and then the Scottish Government budget
is set with the Settlement itself due to be received by the Council on 12 December
38

Page 39

2024.  This is a significant risk area in terms of the Budget Strategy and as a result, it
is proposed that no action is taken regarding the 2024/2025 one-off underspends,
and that instead, these are considered alongside the Settlement when it is received
in mid-December 2024.  Members will be updated on the impact of the Settlement in
January 2025.  
4.11. Transfers from Capital:  The Budget in Appendix 1 includes a £1.000 million transfer
from the Capital Programme for the Private Housing Scheme of Assistance project.
Following a review of the spend, it has been identified that it cannot be classed as
Capital.  Therefore, it is proposed that budget of £1.000 million will be transferred to
Housing and Technical Resource’s Revenue budget.  This is an accounting
transaction only. The total overall budget for the project remains the same.  
4.12. Similarly, a review of the capital programme for Planned Asset Management is
ongoing to determine how much of this expenditure can be classed appropriately as
Capital. Any required transfer to Revenue will be included in the next report.  
5. Housing Revenue Account Position
5.1. As at 4 October 2024, Appendix 2 of the report shows a projected break-even position
on the Housing Revenue Account for financial year 2024/2025.
6. Employee Implications
6.1. None.
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report.
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report.
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources. The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate.
9.2. There are no implications for sustainability in terms of the information contained in this
report.
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required.  
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report.
Jackie Taylor
Executive Director (Finance and Corporate Resources)
1 November 2024
39

Page 40

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 4 October 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
40

Page 41

Note:  While the Year to Date Actual at period 7 presents a net surplus position (£19.545m), this is timing only.  The forecast outturn
shows break-even for the year.
41

Page 42

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 13.782 14.163 (0.381) (2.76%) 1 6.899
Property Costs 60.703 60.251 0.452 0.74% 2,a 28.749
Supplies and Services 1.543 1.543 0.000 0.00% 0.303
Transport and Plant 0.195 0.175 0.020 10.26% 0.068
Administration 5.594 5.594 0.000 0.00% 0.224
Payment to Other Bodies 2.975 2.932 0.043 1.45% 1.074
Payment to Contractors 0.100 0.100 0.000 0.00% 0.127
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 33.573 33.573 0.000 0.00% 0.003
Total Controllable Exp. 118.465 118.331 0.134 0.11% 37.447
Total Controllable Inc. (123.397) (123.250) (0.147) 0.12% 3 (54.584)
Transfer to/(from) Balance Sheet (4.229) (3.511) (0.718) 16.98% 4 0.000
Net Controllable Exp. (9.161) (8.430) (0.731) 7.98% (17.137)
Loan Charges 9.161 8.430 0.731 7.98% 5,a 0.000
Net Controllable Exp. 0.000 0.000 0.000 0.00% (17.137)
Variance Explanations
1. The non-recurring overspend reflects costs associated with new system development.
2. The underspend is due to the provision for debt being less than budgeted, partially offset by greater than budgeted expenditure on repairs and     
maintenance reflecting the volume and cost.
3. The under recovery in income is due to lower-than-expected income from laundry charges.
4. The transfer to reserves is anticipated to be lower than budget due to the overall projected position.
5. The underspend is due to forecast loan charges being lower than budget along with interest on revenue balances being greater than anticipated.
Virements
a) Realignment of budgets to reflect service provision.  Net Effect £0.000m: Property Costs £1.500m, Loan Charges (£1.500m)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 4 October 2024 (No.7)
Housing Revenue Account
42

Page 43

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 21 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Subject: Revenue Budget 2024/2025 - Detailed Resource
Analysis
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2024/2025.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):
[recs]
(1) that the 2024/2025 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted.
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 4 October 2024. The detailed papers cover the
General Services and also the Housing Revenue Account.
3.2. The following information is provided for each Resource and the Housing Revenue
Account:
 An Executive Summary showing the top-level position.
 Details of the most significant variances across Subjective headings and across
Services.
 A line-by-line trend analysis of the total Resource expenditure and income across
Subjective headings.
3.3. These are shown in appendices A to F attached.
4. Employee Implications
4.1. None
5. Financial Implications
5.1. As detailed in each of the individual Resource papers.
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report.
5
43

Page 44

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources. The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate.
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required.  
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report.
Jackie Taylor
Executive Director (Finance and Corporate Resources)
1 November 2024
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
Previous References
 None
List of Background Papers
 Revenue Ledger prints to 4 October 2024
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
44

Page 45

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 3 October 2024 (No.7)
Community and Enterprise Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Facilities, Waste and Grounds 77.307 77.144 0.163 0.21% 36.452
Leisure and Culture 21.738 21.750 (0.012) (0.06%) 13.204
Planning and Regulatory Services 4.659 4.464 0.195 4.19% 1.809
Environmental and Sustainable Devlopment 5.874 5.803 0.071 1.21% 3.105
Roads, Transportation and Fleet 16.592 17.009 (0.417) (2.51%) 5.982
Total Community and Enterprise Resources 126.170 126.170 (0.000) (0.00%) 60.552
5
45

Page 46

Community and Enterprise Resources Variance Analysis 2024/25 (Period 7) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,425k
under
APT&C Basic/Superannuation/NI –
1,906k under 
Facilities, Waste and
Grounds Services -
464k under 
The projected variance is
mainly due to vacant posts
across the services. 
Recruitment is currently being
progressed. 
Planning and
Regulatory Services -
312k under 
Enterprise and
Sustainable
Development - 85k
under 
Roads, Transportation
and Fleet Services -
1,045k under 
The variances are mainly due to
vacant posts, with recruitment
currently being progressed. 
Overtime - (470k) over Facilities, Waste and
Grounds Services -
(267k) over 
The overtime overspend is
predicted mainly within Grounds
and is due to vehicle checks,
verge maintenance works and
weekend work at cemeteries
and golf courses. There is also
a predicted overspend within
Waste due to staff absences. It
is anticipated these will be
offset by underspends in basic
pay (above). 
46

Page 47

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.)
Roads, Transportation
and Fleet Services -
(215k) over 
The predicted overtime
overspend is mainly within
Roads Construction and is due
to costs associated with winter
maintenance and covering staff
turnover. 
Property Costs (91k) over Water Metered Charges - (10k) over Roads, Transportation
and Fleet Services -
(11k) over 
The level of Water charges to
supply the depots within Roads
Contracting is higher than the
budget set. 
Repairs & Maintenance - Internal -
(10k) over
Roads, Transportation
and Fleet Services -
(10k) over 
The projected overspend mainly
relates to the upkeep of the
Road’s construction depots.  
Electricity Contract - (14k) over Roads, Transportation
and Fleet Services -
(14k) over 
This projected overspend
mainly relates to higher than
budgeted electricity expenditure
on the charging of electrical
vehicles. 
Cleaning & Janitorial Supplies - (56k) 
over
Facilities, Waste and
Grounds Services -
(50k) over
This projected overspend
relates to an increase in costs
for cleaning materials.
Supplies and
Services
(211k) over Computer Equipment Purchase -
(132k) over
Planning and
Regulatory Services -
(30k) over 
This projected overspend
mainly relates to the greater
than budgeted costs of the IT
system upgrade for IDOX within
Planning & Building Standards.
47

Page 48

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.)  
Enterprise and
Sustainable
Development - (15k)
over 
This projected overspend is
within Support and relates to IT
Leasing costs, being greater
than budget.   
Roads, Transportation
and Fleet Services -
(87k) over 
This projected overspend
mainly relates to increased
costs for annual subscriptions
for computer licences within
Roads. 
Materials - (77k) over  Facilities, Waste and
Grounds Services -
(78k) over 
This projected overspend
mainly relates to an increased
level of spend on replacement
domestic waste bins within
Waste and general materials
within Streets. 
Transport and
Plant
(393k) over Fleet Services - Repairs - (90k) over Roads, Transportation
and Fleet - (90k) over 
The projected overspend is due
to higher costs in relation to
outside repairs within the Fleet
Workshop. 
Fleet Service Charges - Vehicle
Maintenance - (157k) over
Facilities, Waste and
Grounds Services -
(110k) over 
Roads, Transportation
and Fleet - (44k) over 
This projected overspend is due
to higher than anticipated
charges for routine
maintenance within Waste,
Streets and Grounds. 
The projected overspend is due
to higher than anticipated
charges for routine
maintenance.
48

Page 49

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.) 
Fleet Service Charges - Plant
Maintenance - 34k under 
Roads, Transportation
and Fleet - 34k under 
This projected underspend is
mainly due to lower than
anticipated costs associated
with the upkeep of Winter plant
within Roads. 
Fleet Service Charges - Leasing -
(128k) over 
Roads, Transportation
and Fleet - (141k) over 
Facilities, Waste and
Grounds Services - 20k
under
This projected overspend
mainly relates to increased
annual charges as a result of
the purchase price of new
vehicles.   
This projected underspend is
due to a reduction in the
number of leased vehicles
required within the Streets
service. 
Fleet Service Charges – Hired
Vehicles - (108k) over
Facilities, Waste and
Grounds Services - 17k
under 
Roads, Transportation
and Fleet - (125k) over
This projected underspend is
within Grounds services and
reflects a reduction in the use of
hired vehicles. 
This projected overspend
mainly relates to the higher than
budgeted costs for Winter plant
hire. 
Payment to
Contractors 
(137k) over Payment to Private Contractor –
(137k) over
Facilities, Waste and
Grounds Services -
(37k) over 
This projected overspend is
within Streets and relates to the
upkeep of the Crematorium. 
49

Page 50

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors
Roads, Transportation
and Fleet - (100k) over 
This projected overspend is
mainly due to spend on bridge
repairs and statutory
inspections within Structures,
along with increased contract
costs within the Traffic Section
on traffic lights. 
Income  (566k)
under
recovered
Fees and Charges - General - (535k)
under recovered 
Fees and Charges - Department of
the Authority - 135k over recovered 
Facilities, Waste and
Grounds Services -
(18k) under recovered 
Planning and
Regulatory Services -
(35k) over 
Roads, Transportation
and Fleet - (482k)
under recovered 
Facilities, Waste and
Grounds Services -
135k over recovered 
The projected under recovery is
due to lower than budgeted
income from care of gardens
within Grounds services
partially offset by a predicted
over recovery within Street
cleansing. 
The projected income is less
than anticipated for Planning
applications and Building
warrants. 
The projected under recovery is
within Parking where the
demand is less than
anticipated. 
This projected over recovery is
mainly due to an increase in
additional service requests in
Waste Services from Housing
and Technical Resources for
additional bin uplifts. 
50

Page 51

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.) Recharges – Departments of the
Authority - (175k) under recovered 
Roads, Transportation
and Fleet - (175k)
under recovered 
The projected under recovery is
due to the level of vacancies in
Roads resulting in lower than
budgeted recharges. This under
recovery is offset in an
underspend in employee costs. 
* The underlined variances represent new variances since the last report.
51

Page 52

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 78,154 632 80,376 436 79,701 1,137 81,682 37,095 80,490 1,192
APT & C OVERTIME 1,631 (1) 1,593 37 2,064 (434) 1,680 890 2,150 (470)
APT & C SUPERANNUATION 4,422 857 4,618 802 4,685 744 5,484 2,242 4,739 745
APT & C NIC 6,645 (299) 6,664 (80) 6,806 (207) 6,692 3,166 6,668 24
TRAVEL AND SUBSISTENCE 23 0 24 (1) 23 0 23 2 23 0
OTHER EMPLOYEE COSTS 229 0 229 0 0 0 0 0 0 0
PENSION INCREASES 772 0 772 0 1,114 0 1,114 496 1,180 (66)
ADDITIONAL PENSION COSTS
EMPLOYEE COSTS 91,876 1,189 94,276 1,194 94,393 1,240 96,675 43,891 95,250 1,425
PROPERTY COSTS
RATES 1,005 0 1,007 (1) 1,006 0 1,046 990 1,046 0
SCOTTISH WATER - UNMETERED CHARGES 325 0 325 0 325 0 325 3 325 0
SCOTTISH WATER - METERED CHARGES 166 (11) 166 (11) 167 (11) 156 76 166 (10)
RENT 196 1 196 1 195 1 196 39 196 0
SERVICE CHARGE 42 0 42 0 42 0 42 16 42 0
FACTORING CHARGES 16 0 16 0 16 0 16 21 16 0
PROPERTY INSURANCE 288 0 288 0 288 0 288 7 288 0
SECURITY COSTS 39 5 39 5 43 1 44 44 43 1
GROUND MAINTENANCE 8 0 8 0 8 0 8 6 8 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 0 0 0 0 0 3 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 20 (10) 21 (11) 20 (10) 10 15 20 (10)
LIFE CYCLE MAINTENANCE 10 (10) 10 (10) 10 (10) 0 4 10 (10)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 24 7 23 7 24 7 31 54 24 7
SOLID FUEL HEATING MAINTENANCE 0 0 0 0 0 0 0 2 0 0
ASBESTOS 0 0 0 0 0 0 0 2 0 0
ELECTRICITY - CONTRACT 5,804 (15) 5,803 (14) 5,803 (14) 5,789 1,797 5,803 (14)
GAS 865 0 865 0 865 0 865 730 865 0
HEATING OIL 14 0 14 0 14 0 14 0 14 0
SOLID FUEL 0 0 0 0 0 0 0 1 0 0
JANITORIAL SUPPLIES 1 0 1 0 1 0 1 0 1 0
CLEANING CONTRACT 20 0 20 0 20 0 20 15 20 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 474 (46) 475 (46) 475 (47) 419 306 475 (56)
HEALTH & HYGIENE MATERIALS 25 0 25 0 25 0 25 51 25 0
PEST CONTROL 0 0 0 0 0 0 0 9 0 0
REFUSE UPLIFT 404 0 404 0 404 1 405 323 404 1
OTHER PROPERTY COSTS 27 0 27 0 32 0 32 5 32 0
OFFICE ACCOMODATION FACILITIES 0 0 0 0 0 0 0 4 0 0
PROPERTY COSTS 9,773 (79) 9,775 (80) 9,783 (82) 9,732 4,523 9,823 (91)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 721 (133) 685 (133) 685 (133) 554 383 686 (132)
COMPUTER EQUIPMENT MAINTENANCE 79 0 46 0 46 0 46 4 46 0
I.T. EQUIPMENT MAINT-CONTRACT 322 (16) 220 (20) 217 (16) 221 67 216 5
I.T. ELECTRONIC MESSAGING 74 0 3 0 3 0 3 0 3 0
EQUIPMENT, APPARATUS AND TOOLS 878 0 877 1 878 0 951 445 951 0
SMALL TOOLS 107 0 107 0 107 0 107 0 107 0
FURNITURE - OFFICE 0 0 0 0 0 0 0 3 0 0
FURNITURE - GENERAL 3 0 3 0 3 0 3 0 3 0
FURNISHINGS (INCL. CROCKERY & LINEN) 110 0 110 0 110 0 110 22 110 0
MATERIALS 7,310 (68) 7,298 (56) 7,431 (68) 7,374 2,374 7,451 (77)
STOCK/STORE ISSUES 0 0 0 0 0 0 0 445 0 0
MATERIALS, APPARATUS AND EQUIPMENT 9 0 9 0 9 0 9 6 9 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0 2 0 2 25 2 0
TV LICENCES 0 0 0 0 0 0 0 1 0 0
FOOD PURCHASES 4,646 0 4,643 0 4,646 0 4,646 2,721 4,646 0
BEVERAGES 0 0 0 0 0 0 0 4 0 0
SCHOOL MILK 50 0 50 0 50 0 50 2 50 0
NURSERY MILK 108 0 108 0 108 0 108 22 108 0
NURSERY FRUIT/VEG 129 0 129 0 129 0 129 21 129 0
RECHARGES OF DIRECT FOOD COSTS 68 0 68 0 68 0 68 (4) 68 0
OPENING STOCK 0 0 0 0 0 0 0 1,237 0 0
CLOSING STOCK 0 0 0 0 0 0 0 (1,274) 0 0
PROTECTIVE CLOTHING & UNIFORMS 213 (5) 216 (9) 213 (4) 209 135 213 (4)
LAUNDRY COSTS 10 0 10 0 10 0 10 7 10 0
OTHER SUPPLIES AND SERVICES 1,453 (3) 1,460 (7) 1,456 (3) 1,452 132 1,455 (3)
CATERING - CONTRACT 0 0 0 0 0 0 0 1 0 0
CATERING - EXTERNAL 0 0 0 0 0 0 0 4 0 0
MAJOR SUPPLY OF ELECTRICAL POWER 2,498 0 2,498 0 2,498 0 2,498 439 2,498 0
OUTSOURCED MAIL 0 0 0 0 0 0 0 3 0 0
DELIVERY CHARGE 1 0 1 0 1 0 1 0 1 0
SUPPLIES AND SERVICES 18,791 (225) 18,543 (224) 18,670 (224) 18,551 7,225 18,762 (211)
52

Page 53

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 0 0 0 (3,821) 0 0
PURCHASE OF PLANT 41 22 41 22 41 22 63 4 41 22
FLEET SERVICES - DRIVERS 68 (7) 68 (7) 68 (7) 61 0 68 (7)
FLEET SERVICES - FUEL 2,998 0 2,997 1 2,998 0 2,998 1,952 2,998 0
FLEET SERVICES - VEHICLE HIRE 1,729 (500) 1,729 0 1,729 0 1,729 428 1,729 0
POOL CAR CHARGES - RENTAL 75 (11) 75 (11) 73 (11) 62 35 74 (12)
POOL CAR CHARGES - FUEL 18 4 18 4 18 4 22 0 18 4
POOL CAR CHARGES - ADDITIONAL COSTS 5 2 5 2 5 2 7 0 5 2
TYRES 0 0 0 0 0 0 0 1 0 0
OTHER TRANSPORT COSTS 71 7 71 7 71 7 78 44 71 7
TRANSPORT INSURANCE 93 0 92 0 93 0 93 0 93 0
LICENCES 491 0 491 0 491 0 491 243 491 0
FLEET SERVICES - REPAIRS 1,917 0 1,917 0 1,917 0 1,917 1,586 2,007 (90)
PLANT SERVICES 19 0 19 0 19 0 19 1 19 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,453 (156) 4,449 (153) 4,452 (156) 4,296 2,364 4,453 (157)
FLEET SERVICE CHARGES - PLANT MAINTENANCE 235 34 235 34 235 34 269 134 235 34
FLEET SERVICE CHARGES - ASSET MODIFICATION 61 10 61 10 61 10 71 58 61 10
FLEET SERVICE CHARGES - LEASING 5,192 (128) 5,190 (125) 5,192 (128) 5,064 2,505 5,192 (128)
FLEET SERVICE CHARGES - HIRED VEHICLES 1,205 (108) 1,207 (110) 1,204 (108) 1,156 365 1,264 (108)
FLEET SERVICE CHARGES - CONTRACT HIRE 12 0 12 0 12 0 12 140 12 0
FLEET SERVICE CHARGES - ROAD FUND LICENCE 210 8 210 8 210 8 218 98 210 8
FLEET SERVICE CHARGES - FUEL 3,137 26 3,136 25 3,137 24 3,178 1,332 3,152 26
FLEET SERVICE CHARGES - DRIVERS 52 0 52 0 52 0 52 0 52 0
HIRE OF EXTERNAL VEHICLES 60 8 65 3 60 8 68 0 60 8
HIRE OF EXTERNAL PLANT 337 (9) 337 (9) 337 (9) 328 203 337 (9)
HIRE OF SKIPS 20 (3) 20 (3) 20 (3) 17 12 20 (3)
STORAGE 0 0 0 0 0 0 0 2 0 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 19 0 0
PUPIL TRANSPORT - SPECIAL EDUCATION 0 0 0 0 0 0 0 (109) 0 0
PUPIL TRANSPORT - OTHER 126 0 125 0 126 0 126 103 126 0
TRANSPORT AND PLANT 22,625 (801) 22,622 (302) 22,621 (303) 22,395 7,699 22,788 (393)
ADMINISTRATION
PRINTING AND STATIONERY 119 8 131 (6) 131 (3) 128 66 134 (6)
TELEPHONES 94 15 93 15 100 7 107 19 101 6
MOBILE PHONES 70 0 70 0 70 0 70 0 70 0
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 8 0 8 0 8 0 8 0
ADVERTISING - OTHER 75 0 75 (1) 75 0 75 47 75 0
POSTAGES/COURIERS 38 (5) 39 (6) 36 (3) 33 24 36 (3)
MEMBERSHIP FEES/SUBSCRIPTIONS 32 23 31 23 26 23 49 39 34 15
INSURANCE 261 (1) 261 (1) 261 (1) 260 0 260 0
MEDICAL COSTS 20 (15) 21 (15) 21 (14) 7 22 21 (14)
LEGAL EXPENSES 37 (35) 2 0 2 0 2 33 18 (16)
HOSPITALITY / CIVIC RECOGNITION 3 0 3 0 3 0 3 5 3 0
INTERNET AGENCY FEES 23 0 23 0 23 0 23 16 23 0
SECURITY UPLIFT FEES 26 0 26 0 26 0 26 8 26 0
OTHER ADMIN COSTS 4 0 4 0 4 0 4 3 4 0
TRAINING 3 0 3 0 3 0 3 2 3 0
ADMINISTRATION 813 (10) 790 9 789 9 798 284 816 (18)
PAYMENT TO OTHER BODIES
SPTE: ANNUAL BUS SUBSIDY 1,891 0 1,891 0 1,891 0 1,891 2,630 1,891 0
SPTE: BUS OTHER 258 0 258 0 258 0 258 0 258 0
SPTE: FERRIES 29 0 29 0 29 0 29 0 29 0
SPTE: UNDERGROUND 1,318 0 1,318 0 1,318 0 1,318 0 1,318 0
SPTE: OTHER 1,727 0 1,727 0 1,727 0 1,727 0 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 0 131 0 131 0 131 56 131 0
MANAGEMENT AND TECHNOLOGY 0 0 0 0 0 0 0 53 0 0
YOUTH EMPLOYMENT TRAINING 0 0 0 0 0 0 0 99 0 0
OTHER LOCAL AUTHORITIES 55 20 55 20 55 20 75 43 55 20
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 22 0 22 0 22 0 22 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 39 0 39 0 39 0 39 0
PAYMENTS TO OTHER BODIES 634 0 10,101 0 10,233 (12) 10,221 3,530 10,233 (12)
EXTERNAL AUDIT FEES 3 0 3 0 3 0 3 2 3 0
ACTIVITIES PROGRAMME 70 0 70 0 70 0 70 28 70 0
COUNSELLING 5 0 5 0 5 0 5 1 5 0
PRIVATE INDIVIDUALS - GENERAL 0 0 607 0 607 0 607 0 607 0
PAYMENT TO OTHER BODIES 6,182 20 16,256 20 16,388 8 16,396 6,442 16,388 8
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 13,417 0 285 0 286 0 285 3 285 0
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 0 302 0 302 0 302 16 302 0
PAYMENT TO PRIVATE CONTRACTOR 37,700 (35) 37,701 (36) 37,699 (35) 37,715 22,305 37,852 (137)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 0 0 0 0 10 0 0
PAYMENT TO CONTRACTORS 51,419 (35) 38,288 (36) 38,287 (35) 38,302 22,334 38,439 (137)
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 0 617 0 617 0 617 459 617 0
TRANSFER PAYMENTS 617 0 617 0 617 0 617 459 617 0
53

Page 54

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 0 0 0 0 0 0 0 1 0 0
I.T. EQUIPMENT LEASING-CONTRACT 224 (17) 214 (17) 215 (17) 197 9 214 (17)
FINANCING CHARGES 224 (17) 214 (17) 215 (17) 197 10 214 (17)
TOTAL EXPENDITURE 202,320 42 201,381 564 201,763 596 203,663 92,867 203,097 566
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 0 (37) 0 (37) 0 (37) (1) (37) 0
CONTRIBUTIONS FROM DEVELOPENT 0 0 0 0 0 0 0 (35) 0 0
CONTRIBUTIONS FROM OTHER BODIES (354) 0 (12,814) 0 (12,951) 0 (12,951) (2,431) (12,951) 0
ERDF GRANT 0 0 0 0 0 0 0 (554) 0 0
SALES - GENERAL (4,247) 0 (4,247) 0 (4,226) (21) (4,286) (2,836) (4,266) (20)
SALES - DEPARTMENTS OF THE AUTHORITY (126) 0 (126) 0 (126) 0 (126) (75) (126) 0
FEES AND CHARGES - GENERAL (9,229) (515) (9,592) (569) (9,600) (549) (10,087) (4,796) (9,552) (535)
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,378) 136 (6,995) 166 (6,845) 136 (6,732) (2,536) (6,867) 135
RENTAL INCOME (18) 0 (18) 0 (18) 0 (48) (2) (48) 0
FLEET SERVICES (12,553) 500 (12,553) 0 (12,553) 0 (12,554) (6,059) (12,584) 30
OTHER INCOME (1,519) 12 (1,521) 14 (1,649) 12 (1,628) (921) (1,627) (1)
RECOVERY FROM CAPITAL (1,333) 0 (1,333) 0 (1,333) 0 (1,333) (151) (1,333) 0
RECHARGES - DEPARTMENTS OF THE AUTHORITY (40,684) (175) (27,552) (175) (27,555) (174) (27,711) (11,918) (27,536) (175)
TOTAL INCOME (77,478) (42) (76,788) (564) (76,893) (596) (77,493) (32,315) (76,927) (566)
NET EXPENDITURE 124,842 0 124,593 0 124,870 0 126,170 60,552 126,170 0
54

Page 55

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 3 October 2024 (No.7)
Education Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Education 463.729 463.729 0.000 0.00% 241.755
Total Education Resources 463.729 463.729 0.000 0.00% 241.755
5
55

Page 56

Education Resources Variance Analysis 2024/25 (Period 7) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 435k under Teachers Basic / Superannuation /
National Insurance - (1,015k) over 
APT&C Basic / Superannuation /
National Insurance - 1,450k under
Schools - (1,015k) over 
Early Years - 1,450k
under
The projected overspend
relates to the increased use of
supply teachers for absence
cover. 
The projected underspend
mainly relates to Early Years
posts and is the result of staff
turnover. 
Property Costs (205k) over Cleaning & Janitorial Supplies - (205k)
over
Schools - (205k) over The overspend is due to the
rising costs of cleaning and
janitorial supplies in schools
due to inflation.     
Supplies and
Services
(280k) over Aids for Clients – (72k) over 
Materials, Apparatus and Equipment –
(208k) over 
Schools - (72k) over 
Schools - (208k) over 
This overspend is due to the
increased demand and cost for
new equipment required by
children in school with complex
physical needs. 
The overspend is due to the
additional cost of per capita
expenditure reflecting the
growth in pupil numbers. 
Transport and
Plant 
(2,313k) over Pupil Transport - Strathclyde
Passenger Transport - (2,313k) over 
Schools - (2,313k) over  This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs.
56

Page 57

Subjective Head  Variance  Subjective line  Service / amount  Explanation
Administration
Costs 
45k under Conferences - 50k under Early Years - 50k
under 
The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated.     
Payments to Other
Bodies 
(708k) over  Payments to Other Bodies - 800k
under 
Independent School Places - (1,493k)
over 
Early Years - 800k
under 
Schools - (1,493k) over 
This projected underspend is
due to less than anticipated
core Early Years spend
including cross boundary
charges to other Local
Authorities. 
This projected overspend
reflects the increased cost of
placements for pupils with
additional support needs in
Independent Schools and is
due to both an increase in the
number of places and the cost
of placements. 
Payment to
Contractors
255k under Payment to Private Contractor - 255k
under
Non schools - 255k
under
The projected underspend
relates to the timing of savings
associated with the renewal of
the insurance arrangements
within the contract this year. 
Transfer Payments  220k under Footwear and Clothing Grants - 220k
under 
Schools - 220k under  This projected underspend
reflects lower than anticipated
expenditure on footwear and
clothing grants during the
financial year, reflecting current
demand.
57

Page 58

Subjective Head  Variance  Subjective line  Service / amount  Explanation
Income 2,551k over
recovered
Fees and Charges - Other Local
Authorities - 800k over recovered 
Early Years Fees - 1,751k over
recovered 
Schools - 800k over
recovered 
Early Years - 1,751k
over recovered
This projected over recovery
reflects the increase in income
recovered from other Local
Authorities for children
attending schools in South
Lanarkshire. This income is
used to support the cost of
external placements. 
This projected over recovery in
Early Years’ fees relates to
increased uptake of available
nursery places beyond 1140
hours. 
* The underlined variances represent new variances since the last report. 
58

Page 59

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 180,659 (1,015) 181,600 (1,015) 181,593 (1,015) 182,937 92,558 183,678 (741)
TEACHERS SUPERANNUATION 41,344 0 41,344 0 41,344 0 41,856 23,681 42,049 (193)
TEACHERS NI 18,885 0 18,885 0 18,885 0 19,093 10,231 19,174 (81)
APT&C BASIC 67,335 1,450 67,740 1,450 67,768 1,450 70,443 33,959 68,993 1,450
APT&C OVERTIME 0 0 0 0 0 0 0 9 0 0
APT&C SUPERANNUATION 4,435 0 4,463 0 4,463 0 4,542 2,171 4,542 0
APT&C NIC 4,879 0 4,927 0 4,927 0 5,028 2,661 5,028 0
CARE STAFF - APT&C BASIC 0 0 0 0 0 0 0 99 0 0
CARE STAFF - APT&C SUPERANNUATION 0 0 0 0 0 0 0 6 0 0
CARE STAFF - APT&C NIC 0 0 0 0 0 0 0 7 0 0
MANUAL BASIC 0 0 0 0 0 0 0 32 0 0
MANUAL SUPERANNUATION 0 0 0 0 0 0 0 2 0 0
MANUAL NIC 0 0 0 0 0 0 0 3 0 0
SESSIONAL WORK 0 0 0 0 0 0 0 4 0 0
TRAVEL AND SUBSISTANCE 0 0 0 0 0 0 0 2 0 0
PENSION INCREASES 434 0 434 0 434 0 434 186 434 0
PREMATURE RETIRALS 5,041 0 5,041 0 5,041 0 5,041 2,181 5,041 0
EMPLOYEE COSTS 323,012 435 324,434 435 324,455 435 329,374 167,792 328,939 435
PROPERTY COSTS
RATES 17,898 0 17,898 0 17,898 0 19,102 18,917 19,102 0
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,385 0 1,385 0 1,385 0 1,385 430 1,385 0
SCOTTISH WATER - METERED CHARGES 782 0 782 0 782 0 782 313 782 0
RENT 266 0 266 0 266 0 266 117 266 0
SERVICE CHARGE 40 0 40 0 40 0 40 19 40 0
PROPERTY INSURANCE 480 0 480 0 480 0 480 16 480 0
SECURITY COSTS 68 0 68 0 66 0 68 34 68 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 62 0 62 0 62 0 61 11 61 0
LIFE CYCLE MAINTENANCE 0 0 0 0 0 0 2 2 2 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 0 0 20 0 27 0 45 45 45 0
ADAPTIONS - INTERNAL CONTRACTORS 50 0 50 0 84 0 57 42 57 0
ELECTRICITY  - CONTRACT 8,691 0 8,691 0 8,691 0 8,691 3,121 8,691 0
GAS 4,073 0 4,073 0 4,072 0 4,072 992 4,072 0
HEATING OIL 164 0 164 0 164 0 164 9 164 0
SOLID FUEL 171 0 171 0 171 0 170 152 170 0
FIXTURE & FITTINGS 0 0 0 0 0 0 1 1 1 0
JANITOR SERVICE 154 0 154 0 155 0 136 44 136 0
JANITORIAL SUPPLIES (89) 0 0 0 0 0 0 0 0 0
CLEANING CONTRACT 885 0 825 0 740 0 754 151 754 0
CLEANING OUTWITH CONTRACT 8 0 8 0 8 0 8 0 8 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 309 0 385 (20) 337 (20) 351 275 556 (205)
HEALTH & HYGIENE MATERIALS 45 0 45 0 45 0 46 1 46 0
AKINDOAK CLEANING 7 0 6 0 5 0 5 0 5 0
REFUSE UPLIFT 16 0 16 0 17 0 17 13 17 0
REMOVAL & STORAGE COSTS 0 0 0 0 0 0 1 1 1 0
OTHER PROPERTY COSTS 161 0 161 0 157 0 116 0 116 0
OFFICE ACCOM-FACILITIES MANAGEMENT 0 0 4 0 4 0 0 0 0 0
ACCOMMODATION RECHARGE TO USERS 882 0 882 0 882 0 882 0 882 0
PROPERTY COSTS 36,508 0 36,636 (20) 36,538 (20) 37,702 24,706 37,907 (205)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 87 0 91 0 76 0 136 132 136 0
COMPUTER EQUIPMENT RENTAL 1 0 1 0 1 0 0 0 0 0
I.T. EQUIPMENT MAINT-CONTRACT 2,713 0 2,698 0 2,748 0 2,797 1,962 2,797 0
I.T. ELECTRONIC MESSAGING 22 0 0 0 29 0 6 6 6 0
EQUIPMENT, APPARATUS AND TOOLS 58 0 47 0 38 0 41 15 41 0
SMALL TOOLS 0 0 0 0 0 0 1 1 1 0
AIDS FOR CLIENTS 117 0 135 (18) 135 (18) 117 92 189 (72)
ADAPTATIONS FOR CLIENTS 0 0 0 0 4 0 30 30 30 0
SUPPLIES FOR CLIENTS 0 0 0 0 1 0 4 4 4 0
FURNITURE - OFFICE 1 0 1 0 1 0 7 5 7 0
FURNITURE - GENERAL 114 0 91 0 76 0 62 18 62 0
FURNISHINGS (INCL. CROCKERY & LINEN) 0 0 0 0 6 0 11 11 11 0
MATERIALS 0 0 0 0 4 0 8 8 8 0
MATERIALS, APPARATUS AND EQUIPMENT 1,914 (25) 1,653 (25) 1,330 (25) 1,535 409 1,743 (208)
PUPIL EQUITY FUNDING 7,673 0 7,694 0 7,606 0 4,066 0 4,066 0
SAC FUNDING 0 0 0 0 0 0 49 0 49 0
LIBRARY/RESOURCE CENTREMATERIALS 81 0 82 0 77 0 68 26 68 0
AUDIO VISUAL 4 0 0 0 0 0 (3) 0 (3) 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 4 0 8 0 12 0 16 15 16 0
TV LICENCES - EDUCATION 24 0 23 0 24 0 24 2 24 0
FOODSTUFFS - GENERAL 0 0 0 0 0 0 1 1 1 0
PROVISIONS 32 0 0 0 39 0 39 38 39 0
FOOD PURCHASES 3 0 3 0 6 0 17 17 17 0
BEVERAGES 1 0 1 0 1 0 3 3 3 0
SCHOOL MILK 5 0 1 0 8 0 13 13 13 0
NURSERY MILK 13 0 17 0 60 0 60 35 60 0
NURSERY FRUIT/VEG 23 0 32 0 100 0 100 63 100 0
RECHARGE OF DIRECT FOOD COSTS 0 0 0 0 2 0 4 4 4 0
PROTECTIVE CLOTHING & UNIFORMS 11 0 11 0 16 0 23 18 23 0
LAUNDRY COSTS 2 0 1 0 1 0 3 2 3 0
OTHER SUPPLIES AND SERVICES 23 0 23 0 23 0 24 0 24 0
HEALTH AND SAFETY 134 0 134 0 134 0 133 74 133 0
CATERING - CONTRACT 2,749 0 2,740 0 2,819 0 2,828 85 2,828 0
CATERING - OUTWITH CONTRACT 8 0 8 0 7 0 7 1 7 0
CATERING - EXTERNAL 2 0 0 0 3 0 6 6 6 0
DELIVERY CHARGE 1 0 0 0 3 0 3 3 3 0
SUPPLIES AND SERVICES 15,820 (25) 15,495 (43) 15,390 (43) 12,239 3,099 12,519 (280)
59

Page 60

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 0 0 0
POOL CAR CHARGES-RENTAL 0 0 0 0 4 0 4 4 4 0
OTHER TRANSPORT COSTS 2 0 2 0 2 0 2 0 2 0
INSURANCE 3 0 3 0 3 0 3 0 3 0
FLEET SERVICES - REPAIRS 0 0 0 0 0 0 1 0 1 0
FLEET SERVICE CHARGES 1,587 0 1,587 0 1,970 0 2,074 473 2,074 0
HIRE OF EXTERNAL VEHICLES 10 0 10 0 129 0 94 0 94 0
HIRE OF SKIPS 0 0 0 0 4 0 7 7 7 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 4 0 7 7 7 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 5,675 0 5,675 0 7,075 0 7,074 2,548 7,074 0
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 10,181 (4,098) 10,181 (4,098) 10,648 (4,098) 8,635 5,564 10,948 (2,313)
PUPIL TRANSPORT - OTHER 132 0 132 0 133 0 149 44 149 0
TAXI CHARGES - AD HOC 0 0 0 0 0 0 1 1 1 0
TRANSPORT AND PLANT 17,590 (4,098) 17,590 (4,098) 19,972 (4,098) 18,051 8,648 20,364 (2,313)
ADMINISTRATION
PRINTING AND STATIONERY 277 0 349 0 386 0 411 290 411 0
TELEPHONES 229 0 237 0 234 0 228 85 228 0
MOBILE PHONES 7 0 7 0 7 0 8 0 8 0
ADVERTISING - OTHER 11 0 11 0 11 0 11 0 11 0
POSTAGES/COURIERS 72 0 72 0 69 0 69 21 69 0
MEMBERSHIP FEES/SUBSCRIPTIONS 13 0 80 0 79 0 116 116 116 0
INSURANCE 76 0 76 0 76 0 76 0 76 0
MEDICAL COSTS 1 0 11 0 12 0 16 16 16 0
LEGAL EXPENSES 0 0 1 0 1 0 1 6 6 (5)
SECURITY UPLIFT FEES 0 0 3 0 4 0 4 4 4 0
OTHER ADMIN COSTS 2 0 2 0 2 0 2 0 2 0
CONFERENCES - MEMBERS (incl associated 0 0 4 0 5 0 5 5 5 0
CONFERENCES - OFFICIALS (incl associated costs) 0 53 0 53 0 53 53 0 53 0
TRAINING 89 0 198 0 182 0 316 252 266 50
TRAINING - TEACHERS 0 0 0 0 0 0 1 1 1 0
ADMINISTRATION 777 53 1,051 53 1,068 53 1,317 796 1,272 45
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 0 0 0 0 0 0 0 0 0 0
OTHER LOCAL AUTHORITIES 1,446 (15) 1,446 (15) 1,447 (15) 1,432 429 1,447 (15)
SCOTTISH QUALIFICATIONS AUTHORITY 1,563 0 1,563 0 1,570 0 1,570 1,570 1,570 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 0 0 0 0 0 0 1 0 1 0
PAYMENTS TO OTHER BODIES 18,582 1,100 18,732 1,100 19,235 1,100 20,422 10,435 19,622 800
INDEPENDENT SCHOOL PLACES 3,725 0 3,725 0 5,817 (350) 5,467 2,698 6,960 (1,493)
CONTRACT SPEECH THERAPY 678 0 678 0 678 0 678 169 678 0
SCHOOL ACTIVITIES 104 0 99 0 116 0 184 130 184 0
RESEARCH GRANTS - EDUCATION 13 0 20 0 47 0 45 45 45 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 28 0 28 0 28 0 27 8 27 0
P.E. FACILITIES 123 0 104 0 90 0 76 3 76 0
ACTIVITIES PROGRAMME 1 0 1 0 41 0 154 154 154 0
COUNSELLING 1,228 0 1,228 0 1,228 0 1,712 517 1,712 0
COPYRIGHT AGREEMENT 0 0 27 0 154 0 154 154 154 0
VAT FREE EXCURSIONS - EDUCATION 0 0 0 0 17 0 57 57 57 0
PRIVATE INDIVIDUALS - GENERAL 0 0 0 0 9 0 11 11 11 0
PAYMENT TO OTHER BODIES 27,491 1,085 27,651 1,085 30,477 735 31,990 16,380 32,698 (708)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 46,332 0 46,332 0 46,069 255 46,472 22,245 46,217 255
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 0 8 0 5 0 5 0
PAYMENT TO CONTRACTORS 46,332 0 46,332 0 46,077 255 46,477 22,245 46,222 255
TRANSFER PAYMENTS
RENT REBATES 0 0 0 0 0 0 338 338 338 0
FOOTWEAR & CLOTHING GRANTS 2,023 250 2,023 250 2,023 250 2,273 1,828 2,053 220
WORK EXPERIENCE 22 0 20 0 17 0 13 0 13 0
TRANSFER PAYMENTS 2,045 250 2,043 250 2,040 250 2,624 2,166 2,404 220
FINANCING CHARGES
LEASING CHARGES - FINANCE 0 0 0 0 0 0 0 0 0 0
LEASING CHARGES - OPERATIONAL 3 0 3 0 3 0 3 0 3 0
I.T. EQUIPMENT LEASING - CONTRACT 402 0 387 0 390 0 409 132 409 0
FINANCING CHARGES 405 0 390 0 393 0 412 132 412 0
TOTAL EXPENDITURE 469,980 (2,300) 471,622 (2,338) 476,410 (2,433) 480,186 245,964 482,737 (2,551)
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) 0 (170) 0 (170) 0 (170) (85) (170) 0
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (8,988) 0 (8,988) 0 (10,017) 0 (12,214) (1,380) (12,214) 0
CONTRIBUTIONS FROM OTHER BODIES (1,185) 0 (1,185) 0 (1,282) 0 (1,932) (1,517) (1,932) 0
FEES AND CHARGES - GENERAL 0 0 0 0 0 0 0 0 0 0
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,570) 800 (1,570) 800 (1,570) 800 (770) 0 (1,570) 800
PLAYGROUP ACCOMMODATION CHARGE (10) 0 (10) 0 (10) 0 (10) (10) (10) 0
EARLY YEARS FEES (1,935) 1,500 (1,973) 1,538 (2,068) 1,633 (435) (1,195) (2,186) 1,751
RENTAL INCOME (20) 0 (20) 0 (20) 0 (20) (6) (20) 0
COURSE FEES (35) 0 (35) 0 (35) 0 0 0 0 0
OTHER INCOME (24) 0 (24) 0 (24) 0 (24) (16) (24) 0
ACCOMMODATION INCOME FROM USERS (882) 0 (882) 0 (882) 0 (882) 0 (882) 0
INCOME (14,819) 2,300 (14,857) 2,338 (16,078) 2,433 (16,457) (4,209) (19,008) 2,551
NET EXPENDITURE 455,161 0 456,765 0 460,332 0 463,729 241,755 463,729 0
60

Page 61

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 3 October 2024 (No.7)
Finance and Corporate Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Finance Services - Strategy 1.851 2.011 (0.160) (8.64%) 1.705
Finance Services - Transactions 17.684 17.501 0.183 1.03% 9.923
Audit and Compliance Services 0.318 0.304 0.014 4.40% 0.270
Information Technology Services 6.852 6.888 (0.036) (0.53%) 8.957
Communications and Strategy Services 2.575 2.496 0.079 3.07% 1.572
Administration and Licensing Services 4.048 4.086 (0.038) (0.94%) 2.130
Personnel Services 6.238 6.280 (0.042) (0.67%) 2.764
Total Finance and Corporate Resources 39.566 39.566 0.000 0.00% 27.321
5
61

Page 62

Finance and Corporate Resources Variance Analysis 2024/25 (Period 7) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  (321k) over  APT&C Basic, Superannuation, NI –
(401k) over
Finance Services
(Strategy) – (52k) over
The projected overspend is
due to lower than budgeted
turnover during the year. 
Finance Services
(Transactions) – (52k)
over 
IT Services – (40k) over 
Admin, Legal and
Licensing – (239k) over
The projected overspend is
due to lower than budgeted
turnover during the year. The
overspend is offset by an
over-recovery of income
within Licensing. 
Property Costs (21k) over Security Costs – (20k) over Finance Services
(Transactions) – (20k)
over
The projected overspend
reflects higher than budgeted
costs for security services. 
Supplies and Services (217k) over Computer Equipment Purchase –
(239k) over
IT Services – (135k)
over 
The projected overspend is
due to greater than budgeted
IT costs. 
Finance Services
(Transactions) – (101k)
over 
The projected overspend
reflects two contract renewals
for Civica ICON and Civica
Financials.
62

Page 63

Subjective Head Variance  Subjective line Service / amount Explanation
Administration Costs (40k) over Telephones – 135k under IT Services – 130k
under
The projected underspend
related to lower than
anticipated costs for
telephones.  
Mobile Phones – (71k) over IT Services – (71k) over The projected overspend
reflects the increased costs
of IT services, which is offset
by an over-recovery of
income.  
Postages/Couriers – (118k) over Finance Services
(Transactions) – (111k)
over
The projected overspend in
Administration Costs is due
to higher than budgeted
postage costs for Council Tax
billing. 
Payments to Other
Bodies
(59k) over Payments to Other Bodies – 67k
under 
Personnel – 67k under The projected underspend
relates to medical charges. 
External Audit Fees – (126k) over Finance Services
(Strategy) – 126k over
The projected overspend is a
result of the expected uplift
for External Audit Fees. 
Financing Charges (26k) over IT Equipment Leasing Contract –
(26k) over
Personnel – (31k) over The projected overspend in
Financing Charges is due to
higher than budgeted IT
leasing charges. 
Income  676k over
recovered 
Statutory Additions – Cost of
Collections – 220k over recovered
Finance Services
(Transactions) – 220k
over recovered
The over-recovery of income
relates to Non-Domestic
Rates and an increase in the
value of cases passing to
summary warrant.
63

Page 64

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges – General – 420k
over recovered
Finance Services –
Strategy – 20k over
recovered
The over-recovery of income
is due to higher than
budgeted charge to Funds,
which are driven by costs of
employees and overheads. 
Admin, Legal and
Licensing – 162k over
recovered 
The over-recovery of income
is due to higher than
budgeted income related to
Landlord Registration
applications. 
Finance Services
(Transactions) – 222k
over recovered
The over-recovery reflect
additional commission
received from Scottish Water
for the collection of water and
sewerage. 
Other Income – 29k over recovered Personnel – 54k under
recovered
The under-recovery of
income relates to greater
than budgeted external
income for Modern
Apprentices and internal
income for recharges relating
to Scottish Vocational
Qualifications.    
IT Services – 82k over
recovered 
The over-recovery of income
reflects the increased
recharges of IT spend to
Resources, and is offset by
overspends in Administration
Costs (above).
* The underlined variances represent new variances since the last report.
64

Page 65

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC
TEACHERS OVERTIME 0 0 0 0 0 0 0 1 1 (1)
APT & C BASIC 26,499 160 26,457 86 26,455 107 26,924 13,065 27,452 (528)
APT & C OVERTIME 109 (9) 100 0 96 4 128 119 78 50
APT & C SUPERANNUATION 1,855 26 1,824 44 1,786 107 1,881 694 1,628 253
APT & C NIC 2,624 (107) 2,611 (15) 2,725 (147) 2,596 1,299 2,722 (126)
OTHER EMPLOYEE COSTS 0 0 39 0 77 (38) (415) 0 (445) 30
PENSION INCREASES 984 0 984 0 963 21 984 431 983 1
ADDITIONAL PENSION COSTS
EMPLOYEE COSTS 32,071 70 32,015 115 32,102 54 32,098 15,609 32,419 (321)
PROPERTY COSTS
RATES 0 0 0 0 0 0 0 18 0 0
SCOTTISH WATER - METERED CHARGES 0 0 0 0 0 0 0 1 0 0
RENT 5 0 5 0 5 0 5 4 5 0
SECURITY COSTS 121 0 121 0 121 0 121 74 141 (20)
REPAIRS & MAINTENANCE - INTERNAL CONTRATOR 0 0 0 0 0 0 0 1 0 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRATOR 0 0 0 0 0 0 0 0 0 0
ELECTRICITY  - CONTRACT 0 0 0 0 0 0 0 2 0 0
FIXTURE & FITTINGS 1,557 0 1,557 0 1,557 0 1,707 786 1,707 0
JANITOR SERVICE 0 0 0 0 0 0 0 0 0 0
CLEANING CONTRACT 0 0 0 0 0 0 0 0 0 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 0 0 0 0 0 0 0 0 0 0
HEALTH & HYGIENE MATERIALS 0 0 0 0 0 0 0 0 0 0
REMOVAL & STORAGE COSTS 0 0 0 0 0 0 0 1 0 0
OTHER PROPERTY COSTS 2,183 0 2,183 0 2,183 0 2,583 2 2,584 (1)
PROPERTY COSTS 3,866 0 3,866 0 3,866 0 4,416 889 4,437 (21)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 4,415 (15) 4,220 0 4,075 (42) 4,253 2,761 4,492 (239)
COMPUTER EQUIPMENT RENTAL 0 0 0 0 0 0 0 0 0 0
COMPUTER EQUIPMENT MAINTENANCE 2,327 0 2,078 (30) 2,048 0 2,041 2,403 2,036 5
I.T. EQUIPMENT MAINT - CONTRACT 595 0 594 0 594 0 593 326 595 (2)
I.T. ELECTRONIC MESSAGING 122 0 41 0 41 0 36 0 25 11
EQUIPMENT, APPARATUS AND TOOLS (46) 0 (46) 0 154 0 151 58 151 0
SMALL TOOLS 0 0 0 0 0 0 0 0 0 0
SUPPLIES FOR CLIENTS 219 0 219 0 219 0 219 50 219 0
FURNITURE - OFFICE 1 0 1 0 1 0 1 1 3 (2)
MATERIALS 112 0 112 0 112 0 112 48 112 0
MATERIALS, APPARATUS AND EQUIPMENT 2 0 2 0 2 0 2 3 2 0
AUDIO VISUAL 0 0 0 0 0 0 0 0 0 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 4 0 4 0 4 0 3 0 3 0
FOODSTUFFS - GENERAL 25 0 24 0 24 0 24 2 28 (4)
PROTECTIVE CLOTHING & UNIFORMS 2 0 2 0 2 0 2 (2) 1 1
OTHER SUPPLIES AND SERVICES 36 0 37 0 37 0 122 48 113 9
HEALTH AND SAFETY 0 0 0 0 0 0 0 0 1 (1)
CATERING - OUTWITH CONTRACT 6 0 6 0 6 0 6 (1) 1 5
OUTSOURCED MAIL 175 0 175 0 175 0 174 90 174 0
SUPPLIES AND SERVICES 7,995 (15) 7,469 (30) 7,494 (42) 7,739 5,787 7,956 (217)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 1 0 0
POOL CAR CHARGES - RENTAL 18 0 17 0 17 0 15 0 10 5
POOL CAR CHARGES - FUEL 3 0 3 0 3 0 3 0 3 0
POOL CAR CHARGES - ADDITIONAL COSTS 0 0 0 0 0 0 0 0 0 0
LICENCES 0 0 0 0 0 0 0 0 0 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 13 0 13 0 13 0 16 6 14 2
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 0 0 0
TRANSPORT AND PLANT 34 0 33 0 33 0 34 7 27 7
ADMINISTRATION
PRINTING AND STATIONERY 524 0 523 0 523 0 528 156 529 (1)
TELEPHONES 1,567 0 1,553 0 1,552 1 1,551 758 1,416 135
MOBILE PHONES 177 0 175 0 175 0 175 253 246 (71)
ADVERTISING - RECRUITMENT 29 0 29 0 29 0 29 35 44 (15)
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 1 0 1 0 0 0 0 0
ADVERTISING - OTHER 123 0 123 0 123 0 123 51 123 0
POSTAGES/COURIERS 935 (20) 940 (25) 943 (28) 908 451 1,026 (118)
SMS MESSAGING 10 0 10 0 10 0 10 5 10 0
MEMBERSHIP FEES/SUBSCRIPTIONS 233 0 231 (2) 231 (2) 228 187 226 2
INSURANCE 140 0 141 0 141 0 141 0 141 0
MEDICAL COSTS 351 0 350 0 350 0 350 169 349 1
LEGAL EXPENSES 183 0 183 0 183 0 192 57 192 0
HOSPITALITY / CIVIC RECOGNITION 24 0 30 1 30 0 31 3 30 1
PAYPOINT AGENCY FEES 70 0 70 0 70 0 70 42 70 0
SECURITY UPLIFT FEES 2 0 2 0 2 0 2 1 2 0
OTHER ADMIN COSTS 1,604 0 1,604 0 1,604 0 641 426 640 1
MEMBERS ALLOWANCES 1,871 0 1,871 0 1,871 0 1,870 881 1,846 24
CONFERENCES - MEMBERS (incl associated costs) 11 0 11 0 11 0 11 (10) 11 0
CONFERENCES - OFFICIALS (incl associated costs) 6 0 6 0 6 0 5 1 5 0
TRAINING 762 0 761 0 761 0 761 373 760 1
VOLUNTEERS' EXPENSES 7 0 7 0 7 0 7 4 7 0
INTERNAL SUPPORT SERVICES ALLOCATION 68 0 68 0 68 0 68 0 68 0
ADMINISTRATION 8,698 (20) 8,689 (26) 8,691 (29) 7,701 3,843 7,741 (40)
65

Page 66

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
PAYMENT TO OTHER BODIES
JOINT COMMITTEES - GENERAL
MANAGEMENT AND TECHNOLOGY TRAINING GRANT 0 0 0 0 0 0 0 (1) 0 0
YOUTH EMPLOYMENT TRAINING INITIATIVE 0 0 0 0 0 0 0 1 0 0
GRANTS TO VOLUNTARY ORGANISATIONS 652 27 646 33 547 132 678 309 678 0
PAYMENTS TO OTHER BODIES 2,592 (30) 2,607 (45) 2,788 (45) 2,753 2,028 2,686 67
EXTERNAL AUDIT FEES 658 (58) 672 (72) 672 (72) 600 320 726 (126)
PAYMENT TO OTHER BODIES 3,902 (61) 3,925 (84) 4,007 15 4,031 2,657 4,090 (59)
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR
PAYMENT TO PRIVATE CONTRACTOR 28 0 28 0 28 0 28 0 28 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 249 0 249 0 249 0 244 32 243 1
PAYMENT TO CONTRACTORS 277 0 277 0 277 0 272 32 271 1
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 0 23,581 0 23,581 0 23,581 11,468 23,581 0
RENT REBATES 41,707 0 41,707 0 41,707 0 42,418 18,119 42,418 0
TRANSFER PAYMENTS 65,288 0 65,288 0 65,288 0 65,999 29,587 65,999 0
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 1 0 1 0 1 0 0 0 0 0
I.T. EQUIPMENT LEASING-CONTRACT 1,274 (20) 1,253 (40) 1,223 (10) 1,213 913 1,239 (26)
FINANCING CHARGES 1,275 (20) 1,254 (40) 1,224 (10) 1,213 913 1,239 (26)
TOTAL EXPENDITURE 123,406 (46) 122,816 (65) 122,982 (12) 123,503 59,324 124,179 (676)
INCOME
NON RELEVANT GOVERNMENT GRANT (850) 0 (850) 0 (850) 0 0 0 0 0
STATUTORY ADDITIONS - COST OF COLLECTION (865) 0 (865) 0 (865) 0 (865) 0 (1,085) 220
RENT REBATES SUBSIDY (37,191) 0 (37,191) 0 (37,191) 0 (37,191) (16,573) (37,191) 0
RENT ALLOWANCE SUBSIDY (23,067) 0 (23,067) 0 (23,067) 0 (23,067) (9,573) (23,067) 0
DWP SUBSIDY (1,170) 0 (1,170) 0 (1,170) 0 (1,170) (639) (1,170) 0
DHP 0 0 0 0 0 0 (347) (347) (347) 0
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (150) 0 (150) 0 (150) 0 (149) (89) (150) 1
CONTRIBUTIONS FROM OTHER BODIES (105) 0 (105) 0 (105) 0 (305) (2,220) (320) 15
SALES - DEPARTMENTS OF THE AUTHORITY (20) 0 (20) 0 (20) 0 (20) 0 (14) (6)
FEES AND CHARGES - GENERAL (4,352) 6 (4,357) 10 (4,367) 20 (4,354) (1,951) (4,774) 420
CHARGES TO HEALTH BOARDS (45) 0 (45) 0 (45) 0 (45) 0 (45) 0
FEES AND CHARGES - OTHER BODIES (222) 0 (222) 0 (222) 0 (221) (151) (221) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,482) 0 (2,489) 0 (2,489) 0 (2,488) (1,159) (2,494) 6
HOME LOANS REPAYMENTS (5) 0 (5) 0 (5) 0 (4) (15) (4) 0
BIRTH REGISTRATION (19) 0 (19) 0 (19) 0 (19) (9) (16) (3)
DEATH REGISTRATION (73) 0 (73) 0 (73) 0 (73) (32) (68) (5)
MARRIAGE STATUTORY FEES (95) 0 (95) 0 (95) 0 (95) (74) (103) 8
EXTRACT ISSUE (88) 0 (88) 0 (88) 0 (88) (42) (79) (9)
MARRIAGES (49) 0 (49) 0 (49) 0 (49) (26) (44) (5)
CITIZENSHIP CEREMONIES (11) 0 (11) 0 (11) 0 (11) (8) (15) 4
CIVIL PARTNERSHIPS 0 0 0 0 0 0 0 0 (1) 1
OTHER INCOME (8,047) 40 (6,755) 55 (6,691) (10) (6,699) 905 (6,728) 29
REALLOCATION OF CENTRAL SUPPORT COSTS (6,653) 0 (6,653) 0 (6,653) 2 (6,668) 0 (6,668) 0
REALLOCATION OF SUPPORT COSTS (25) 0 (25) 0 (25) 0 (9) 0 (9) 0
INCOME (85,584) 46 (84,304) 65 (84,250) 12 (83,937) (32,003) (84,613) 676
NET EXPENDITURE 37,822 0 38,512 0 38,732 0 39,566 27,321 39,566 0
66

Page 67

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 3 October 2024 (No.7)
Housing and Technical Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Housing Services 8.767 8.705 0.062 0.71% 5.682
Property Services 5.623 5.685 (0.062) (1.10%) 19.464
Total Housing and Technical Resources 14.390 14.390 0.000 0.00% 25.146
5
67

Page 68

Housing and Technical Resources (excl HRA) Variance Analysis 2024/25 (Period 7) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,596k
under
APT&C Basic / Overtime /
Superannuation / National Insurance
– 907k under
Property Services –
900k under 
The variance relates to
vacancies which are actively
being recruited in line with
Service requirements. 
Manual Basic / Overtime /
Superannuation / National Insurance
– 702k under 
Property Services –
701k under 
The variance relates to
vacancies and reflects the
current level of trade operatives
and overtime required to meet
service demands.   
Property Costs (620k) over Rates – 175k under  Property Services -
175k under 
The variance relates to
unrequired budget for rates
charges for Council properties. 
Service Charges – (311k) over  Property Services -
(299k) over 
The overspend relates to the
cost of shopping centre service
charges which are not
recoverable from tenants. 
Other Accommodation – 124k under  Housing Services –
124k under 
The forecasted underspend is
due to lower than budgeted
temporary accommodation
rental costs. 
Bed & Breakfast – (148k) over  Housing Services –
(148k) over 
The overspend relates to
greater than anticipated
demand for the service. 
68

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Repairs & Maintenance – (237k) over  Property Services -
(258k) over 
The overspend relates to
additional expenditure in
property maintenance.   
Electricity – Contract/Non Contract
(104k) over 
Housing Services –
(54k) over 
Property Services -
(50k) over 
This relates to the current
market prices for utilities which
is higher than budget. 
This relates to the current
market prices for utilities which
is higher than budget. 
Fixture & Fittings – (126k) over  Housing Services –
(126k) over 
This relates to the furniture
costs within homeless
temporary accommodation and
is demand led. 
Supplies &
Services 
1,657k
under
Materials/Stock & Store Issues –
1,661k under 
Property Services –
1,661k under 
Expenditure on materials varies
depending on the current
workload demands and timing
of works on a wide variety of
capital and revenue works. 
Transport & Plant  67k under Pool Car Charges – Rental/Fuel – 59k
under 
Property Services - 59k
under 
The underspend relates to
lower than budgeted pool car
charges within the Estates team
due to a reduction in pool car
demand. 
69

Page 70

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to Other
Bodies 
(122k) over Supporting People – Internal/External
Provider– 32k under 
Assistance to Homeowners – (130k)
over 
Housing Services –
32k under 
Property Services -
(130k) over 
The underspend relates to a
reduction in payments to
registered social landlords. 
This overspend reflects the
demand of grant funding to
owners within the Scheme of
Assistance service. 
Payment to
Contractors
(4,350k)
over
Payment to Private Contractors –
(4,050k) over 
Payment to External Consultants –
(300k) over 
Housing Services –
78k under 
Property Services –
(4,128k) over 
Property Services –
(300k) over 
The underspend relates to
commissioned services in the
Homelessness budget where
expenditure varies according to
service requirements. 
Expenditure on contractor
payments varies depending on
the current workload demands
and timing of works on a wide
variety of capital and revenue
works. 
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet current service demands. 
Income  1,794k over
recovered
Fees & Charges – 130k over
recovered 
Housing Services –
132k over recovered 
The over recovery relates to the
provision of additional service
provision within the
Homelessness service.
70

Page 71

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Rental Income - (200k) under
recovered 
House Rents – (213k) under
recovered 
Other Income – 121k over recovered 
Recovery from Capital/Recharges -
Departments of the Authority – 1,932k
over recovered 
Property Services -
(200k) under recovered 
Property Services –
210k over recovered 
Housing Services –
(213k) under recovered 
Housing Services –
121k over recovered 
Property Services -
1,932k over
recovered 
The under recovery relates to
the shopping centre income,
which is lower than budgeted
due to vacant units. 
This mainly relates to building
services income streams which
are variable each financial year
due to the demand for repair
requests.  
The under recovery relates to
less house rent income than
budgeted within the
Homelessness service. 
The over recovery relates to
additional external Rapid
Rehousing Transition Plan
funding for employee costs and
living wage uplift. 
The level of income recovered
varies depending on the current
workload and the timing of a
wide variety of projects and is
offset by a reduction in
expenditure.  
* The underlined variances represent new variances since the last report.
71

Page 72

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 16,298 737 16,310 725 15,675 1,357 17,097 7,729 16,790 307
APT & C OVERTIME 19 183 26 176 44 158 202 68 60 142
APT & C SUPERANNUATION 1,046 116 1,045 117 1,017 145 1,172 468 948 224
APT & C NIC 1,685 75 1,696 64 1,618 142 1,762 747 1,528 234
MANUAL BASIC 19,432 619 19,052 999 20,421 (370) 20,051 9,908 19,320 731
MANUAL OVERTIME 120 468 179 409 345 243 588 575 354 234
MANUAL SUPERANNUATION 1,374 (74) 1,445 (145) 1,641 (341) 1,300 638 1,636 (336)
MANUAL NIC 2,125 (100) 1,988 37 2,240 (215) 2,025 1,062 1,952 73
OTHER EMPLOYEE COSTS 489 0 488 1 488 1 489 228 496 (7)
PENSION INCREASES 602 0 604 (2) 639 (37) 602 278 621 (19)
ADDITIONAL PENSION COSTS 13 0 14 (1) 13 0 13 0 0 13
EMPLOYEE COSTS 43,203 2,024 42,847 2,380 44,141 1,083 45,301 21,701 43,705 1,596
PROPERTY COSTS
RATES 2,054 200 2,059 195 2,050 204 2,382 1,999 2,207 175
SCOTTISH WATER - UNMETERED CHARGES 12 0 12 0 12 0 12 12 26 (14)
SCOTTISH WATER - METERED CHARGES 268 (27) 268 (27) 268 (27) 241 138 288 (47)
RENT 1,743 (12) 1,745 (14) 1,745 (12) 1,733 1,538 1,744 (11)
SERVICE CHARGE 787 (348) 775 (336) 750 (311) 439 400 750 (311)
FACTORING CHARGES 9 0 9 0 9 0 9 4 9 0
OTHER ACCOMMODATION COSTS 2,550 (276) 2,550 (276) 2,550 (276) 2,674 380 2,550 124
BED AND BREAKFAST 175 (148) 175 (148) 175 (148) 27 30 175 (148)
PROPERTY INSURANCE 386 0 386 0 386 0 386 129 386 0
SECURITY COSTS 299 0 299 0 299 0 293 172 336 (43)
GROUND MAINTENANCE 52 0 52 0 52 0 52 52 52 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 0 10 0 10 0 10 5 10 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 3,449 (536) 3,392 (479) 3,392 (479) 3,113 3,249 3,350 (237)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 0 0 0 0 0 0 0 1 0 0
LIFE CYCLE MAINTENANCE 754 0 754 0 754 0 754 1,762 754 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 395 0 395 0 395 0 366 95 356 10
ADAPTIONS - INTERNAL CONTRACTORS 0 0 0 0 0 0 0 13 0 0
HOUSING - RENT FREE ACCOMMODATION 0 0 0 0 0 0 0 6 0 0
GAS MAINTENANCE COSTS 0 0 0 0 0 0 0 4 0 0
ELECTRICAL HEATING MAINTENANCE 0 0 0 0 0 0 0 7 0 0
HOUSING - RENT W/O UNLET PERIODS 736 (24) 785 (24) 785 (24) 811 461 786 25
HOUSING - RENT W/O BAD PERIODS 681 97 631 97 631 97 728 638 580 148
ASBESTOS 0 0 0 0 0 0 0 232 0 0
ELECTRICITY  - CONTRACT 1,497 (51) 1,498 (52) 1,508 (51) 1,457 868 1,557 (100)
ELECTRICITY  - NON CONTRACT 31 (2) 31 (2) 31 (2) 29 8 33 (4)
GAS 577 (1) 579 (3) 577 (1) 576 293 576 0
HEATING OIL 12 0 12 0 12 0 12 0 12 0
FIXTURE & FITTINGS 1,295 (375) 1,295 (375) 1,295 (375) 1,169 1,454 1,295 (126)
JANITOR SERVICE 164 0 164 0 164 0 164 152 164 0
CLEANING CONTRACT 407 0 421 (14) 407 0 407 323 407 0
CLEANING OUTWITH CONTRACT 0 0 0 0 0 0 0 9 0 0
CLEANING MATERIALS 10 0 10 0 10 0 10 3 10 0
HEALTH & HYGIENE MATERIALS 0 0 0 0 0 0 0 2 0 0
WINDOW CLEANING 2 0 2 0 2 0 2 1 2 0
PEST CONTROL 18 (12) 18 (12) 18 (12) 6 0 6 0
REFUSE UPLIFT 412 (7) 412 (7) 412 (7) 405 11 405 0
REMOVAL & STORAGE COSTS 20 28 20 28 20 28 48 10 47 1
OTHER PROPERTY COSTS 556 0 556 0 556 0 556 305 600 (44)
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 0 1,113 0 1,113 0 1,113 985 1,113 0
ACCOMMODATION RECHARGE TO USERS 33 0 33 0 33 0 33 28 51 (18)
PROPERTY COSTS 20,507 (1,494) 20,461 (1,449) 20,421 (1,396) 20,017 15,779 20,637 (620)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 474 0 446 0 448 0 448 113 439 9
COMPUTER EQUIPMENT MAINTENANCE 6 0 6 0 6 0 6 0 6 0
I.T. EQUIPMENT MAINT-CONTRACT 223 (1) 211 (2) 210 (1) 209 1 210 (1)
EQUIPMENT, APPARATUS AND TOOLS 46 0 45 0 45 0 45 31 45 0
SMALL TOOLS 0 0 0 0 0 0 0 0 0 0
ADAPTATIONS FOR CLIENTS 500 0 500 0 500 0 500 217 500 0
FURNITURE - OFFICE 0 0 0 0 0 0 0 1 1 (1)
FURNISHINGS 0 0 0 0 0 0 0 65 0 0
MATERIALS 12,330 0 12,329 0 12,329 0 12,084 1,770 11,926 158
STOCK/STORE ISSUES 0 0 0 0 0 0 0 3,218 (1,503) 1,503
AUDIO VISUAL 10 0 10 0 10 0 10 0 10 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0 2 0 2 0 0 2
TV LICENCES - EDUCATION 1 0 1 0 1 0 1 0 1 0
FOODSTUFFS - GENERAL 1 0 1 0 1 0 1 0 0 1
BEVERAGES 1 0 1 0 1 0 1 0 1 0
PROTECTIVE CLOTHING & UNIFORMS 44 0 44 0 44 0 44 8 45 (1)
OTHER SUPPLIES AND SERVICES 167 0 168 0 180 0 180 35 191 (11)
HEALTH AND SAFETY 1 0 1 0 1 0 1 0 1 0
CATERING - CONTRACT 1 0 1 0 1 0 1 0 0 1
CATERING - OUTWITH CONTRACT 0 0 0 0 0 0 0 0 0 0
MAJOR SUPPLY OF ELECTRICAL POWER 0 0 0 0 0 0 0 8 0 0
OUTSOURCED MAIL 0 0 0 0 0 0 0 14 3 (3)
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 (2) 0 0
IPROCUREMENT ERRORS 0 0 0 0 0 0 0 0 0 0
SUPPLIES AND SERVICES 13,807 (1) 13,766 (2) 13,779 (1) 13,533 5,479 11,876 1,657
72

Page 73

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 0 0 0 4 0 0
PURCHASE OF PLANT 125 0 125 0 215 (90) 125 79 125 0
FLEET SERVICES - FUEL 1 0 1 0 1 0 1 4 1 0
POOL CAR RECHARGE - RENTAL CHARGE 98 0 98 0 98 0 98 13 54 44
POOL CAR RECHARGE - FUEL 24 2 24 2 26 0 26 0 11 15
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0 1 0 1 0 1 0
OTHER TRANSPORT COSTS 0 0 0 0 0 0 0 1 0 0
TRANSPORT INSURANCE 44 0 45 (1) 44 0 44 0 44 0
PLANT SERVICES 7 0 7 0 13 (6) 7 1 7 0
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 331 0 331 0 332 (1) 331 358 331 0
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 1 0 2 (1) 1 0 1 0
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 0 7 0 7 0 7 5 7 0
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 0 15 0 15 0 15 19 15 0
FLEET SERVICE CHARGES LEASING 1,402 0 1,402 0 1,405 (3) 1,402 132 1,397 5
FLEET SERVICE CHARGES HIRED VEHICLES 205 0 209 (4) 205 0 205 116 205 0
FLEET SERVICE CHARGES CONTRACT HIRE 48 0 48 0 46 2 48 29 46 2
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 117 0 117 0 117 0 117 125 117 0
FLEET SERVICE CHARGES FUEL 842 0 842 0 843 (1) 842 391 842 0
HIRE OF EXTERNAL PLANT 257 0 256 1 266 (9) 257 47 256 1
HIRE OF SCAFOLDING 1,077 0 1,077 0 1,077 0 1,077 404 1,077 0
HIRE OF SKIPS 33 0 33 0 33 0 33 478 33 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 0 0 0
TAXI CHARGES - CONTRACTED 42 (1) 42 (1) 42 (1) 41 20 41 0
TRANSPORT AND PLANT 4,677 1 4,681 (3) 4,788 (110) 4,678 2,226 4,611 67
ADMINISTRATION
PRINTING AND STATIONERY 81 0 84 (3) 81 0 76 52 80 (4)
TELEPHONES 95 (1) 95 (1) 94 0 94 5 92 2
MOBILE PHONES 38 2 38 2 40 0 40 2 40 0
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 7 0 7 0 7 0 7 0 0 7
ADVERTISING - OTHER 6 0 6 0 6 0 6 0 6 0
POSTAGES/COURIERS 21 0 21 0 21 0 21 21 35 (14)
SMS MESSAGING 0 0 0 0 0 0 0 0 0 0
MEMBERSHIP FEES/SUBSCRIPTIONS 12 0 13 (1) 12 0 12 79 12 0
INSURANCE 223 (7) 228 (12) 223 (7) 216 0 223 (7)
MEDICAL COSTS 16 0 16 0 16 0 16 11 16 0
LEGAL EXPENSES 20 (2) 20 (2) 18 0 8 8 11 (3)
PETTY OUTLAYS 12 0 12 0 12 0 12 10 12 0
HOSPITALITY / CIVIC RECOGNITION 2 0 2 0 2 0 2 0 2 0
BANK CHARGES 0 0 0 0 0 0 0 4 0 0
PAYPOINT AGENCY FEES 0 0 0 0 0 0 0 4 0 0
OTHER ADMIN COSTS 13 0 13 0 13 0 8 0 9 (1)
TRAINING 0 0 0 0 0 0 0 0 0 0
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 457 0 457 0 457 39 457 0
CENTRAL ADMINISTRATION 2,749 0 2,860 (111) 2,749 0 2,749 0 2,749 0
ADMINISTRATION 3,752 (8) 3,872 (128) 3,751 (7) 3,724 235 3,744 (20)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,019 0 2,079 (60) 2,019 0 2,019 16 2,019 0
OTHER LOCAL AUTHORITIES 0 0 0 0 0 0 0 5 0 0
PAYMENTS TO OTHER BODIES 1,164 (44) 1,164 (44) 1,164 (44) 905 539 949 (44)
SUPPORTING PEOPLE INTERNAL PROVIDER 1,129 0 1,129 0 1,129 0 1,129 652 1,211 (82)
SUPPORTING PEOPLE EXTERNAL PROVIDER 732 50 725 57 608 174 782 363 624 158
HOUSING ADMINISTRATION 885 0 885 0 885 0 885 132 885 0
ASSISTANCE TO HOME OWNERS (33) (36) (33) (36) 244 (313) 1,091 521 1,221 (130)
PRIVATE INDIVIDUALS - GENERAL 168 0 168 0 168 0 168 79 192 (24)
PAYMENT TO OTHER BODIES 6,064 (30) 6,117 (83) 6,217 (183) 6,979 2,307 7,101 (122)
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 0 0 0 0 0 0 0 16 0 0
PAYMENT TO PRIVATE CONTRACTOR 11,945 825 11,992 778 11,253 1,517 12,070 9,202 16,120 (4,050)
PAYMENT TO EXTERNAL CONSULTANTS 606 (300) 632 (326) 413 (107) 306 55 606 (300)
PAYMENT TO CONTRACTORS 12,551 525 12,624 452 11,666 1,410 12,376 9,273 16,726 (4,350)
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 154 0 155 (1) 154 0 154 16 156 (2)
INTEREST ON REVENUE BALANCES 2 0 2 0 2 0 2 0 2 0
FINANCING CHARGES 156 0 157 (1) 156 0 156 16 158 (2)
73

Page 74

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TOTAL EXPENDITURE 104,717 1,017 104,525 1,166 104,919 796 106,764 57,016 108,558 (1,794)
INCOME
CONTRIBUTIONS FROM OTHER BODIES (2,361) 0 (2,361) 0 (2,385) 0 (2,385) (1,026) (2,409) 24
SALES - DEPARTMENTS OF THE AUTHORITY (460) 0 (486) 26 (460) 0 (460) 0 (460) 0
FEES AND CHARGES - GENERAL (694) 113 (694) 113 (694) 113 (581) (212) (711) 130
FEES AND CHARGES - DEPARTMENTS OF THE A (48) 0 (48) 0 (48) 0 (48) 0 (48) 0
RENTAL INCOME (3,927) (200) (3,909) (218) (3,927) (200) (4,127) (2,332) (3,927) (200)
HOUSE RENTS (5,994) (13) (5,994) (13) (5,994) (13) (6,207) (3,159) (5,994) (213)
INSURANCE RECOVERIES 0 0 0 0 0 0 0 (2) 0 0
OTHER INCOME (2,793) 46 (2,817) 70 (3,078) 331 (2,747) (1,212) (2,868) 121
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 (876) 0 (876) 0 (876) 0 (876) 0
REALLOCATION OF SUPPORT COSTS (1,580) (49) (1,630) 1 (1,769) 140 (1,629) 0 (1,629) 0
RECOVERY FROM CAPITAL (27,721) (3,701) (27,054) (4,368) (27,010) (4,412) (31,422) (8,100) (28,144) (3,278)
RECHARGES - DEPARTMENTS OF AUTHORITY (44,679) 2,787 (45,115) 3,223 (45,137) 3,245 (41,892) (18,735) (47,102) 5,210
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 0 0 0 0 0 0 2,908 0 0
INCOME (91,133) (1,017) (90,984) (1,166) (91,378) (796) (92,374) (31,870) (94,168) 1,794
NET EXPENDITURE 13,584 0 13,541 0 13,541 0 14,390 25,146 14,390 0
74

Page 75

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2024/25 (Period 7)
Subjective Head Variance Subjective Line Service / Amount Explanation
Employee Costs (381k) over APT&C Basic / Overtime /
Superannuation / National
Insurance – (381k) over
HRA The overspend is a result
of the backfill posts
covering seconded staff to
the One Housing IT
system project. 
Property Costs 452k under Repairs and Maintenance
– Internal and External
Contractor – (964k) over
HRA The overspend reflects
the current demand for
repairs and continuing
high cost of voids. The
position includes a
recharge for recovery of
costs from chargeable
services. 
Housing – Rent Write off
Unlet Periods/Bad
Periods – 1,444k under 
HRA The net underspend
reflects a lower than
anticipated level of bad
debt provision. During the
year collection rates for
rental income have been
better than forecast,
which is due in part to
schemes such as the
tenancy sustainment fund
mitigating the overall level
of debt. 
5
75

Page 76

Subjective Head Variance Subjective Line Service / Amount Explanation
Financing Charges 731k under Interest – Debt Charges –
585k under 
HRA The overall level of debt
charges is forecast to be
lower than budgeted due
to the profile of funding
requirements. 
Interest on Revenue
Balances – 146k under 
HRA The level of interest
received reflects the level
of balances and interest
rates being higher than
anticipated. 
Income (865k) under recovered Fees and Charges
General – (95k) under
recovered 
Year End Transfer from
the Balance Sheet –
(718k) under recovered 
HRA 
HRA
The under recovery
reflects less than
anticipated income from
the introduction of laundry
charges. 
The budget assumes a
level of transfer from
reserves, due to the
current net underspend
across the service. This is
mainly as a result of the
before mentioned level of
debt charges.
* The underlined variances represent new variances since the last report. 
76

Page 77

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Housing Revenue Account Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 11,629 0 11,629 0 11,629 0 11,629 5,873 12,104 (475)
APT & C OVERTIME 78 0 78 0 78 0 78 23 16 62
APT & C SUPERANNUATION 722 0 722 0 722 0 722 369 751 (29)
APT & C NIC 1,142 0 1,142 0 1,142 0 1,142 537 1,081 61
PENSION INCREASES 211 0 211 0 211 0 211 97 211 0
EMPLOYEE COSTS 13,782 0 13,782 0 13,782 0 13,782 6,899 14,163 (381)
PROPERTY COSTS
RATES 72 0 72 0 72 0 72 49 117 (45)
SCOTTISH WATER - UNMETERED CHARGES 4 0 4 0 4 0 4 0 4 0
SCOTTISH WATER - METERED CHARGES 8 0 8 0 8 0 8 4 8 0
RENT 6 0 6 0 6 0 6 0 6 0
SERVICE CHARGE 94 0 94 0 94 0 94 1 94 0
FACTORING CHARGES 0 0 0 0 0 0 0 0 0 0
OTHER ACCOMMODATION COSTS 11 0 11 0 11 0 11 0 11 0
BED AND BREAKFAST 0 0 0 0 0 0 0 0 0 0
PROPERTY INSURANCE 2,160 0 2,160 0 2,160 0 2,160 0 2,160 0
SECURITY COSTS 55 0 55 0 55 0 55 2 55 0
GROUND MAINTENANCE 4,465 0 4,465 0 4,465 0 4,465 3,744 4,465 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 0 0 0 0 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 41,997 0 41,997 0 41,997 0 43,497 21,347 44,461 (964)
LIFE CYCLE MAINTENANCE 0 0 0 0 0 0 0 26 0 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 0 877 0 877 0 877 332 877 0
HOUSING - RENT FREE ACCOMMODATION 266 0 266 0 266 0 266 110 266 0
HOUSING - RENT W/O UNLET PERIODS 2,588 0 2,588 0 2,588 0 2,588 1,346 2,753 (165)
HOUSING - RENT W/O BAD PERIODS 3,743 0 3,743 0 3,743 0 3,743 371 2,134 1,609
ASBESTOS 139 0 139 0 139 0 139 54 139 0
FIXED ELECTRICAL 0 0 0 0 0 0 0 0 0 0
EPC 0 0 0 0 0 0 0 0 0 0
GAS SOUNDNESS TESTING 0 0 0 0 0 0 0 3 0 0
ELECTRICITY  - CONTRACT 1,358 0 1,358 0 1,358 0 1,358 356 1,341 17
ELECTRICITY  - NON CONTRACT 0 0 0 0 0 0 0 0 0 0
GAS 436 0 436 0 436 0 436 192 436 0
HEATING OIL 54 0 54 0 54 0 54 10 54 0
SOLID FUEL 4 0 4 0 4 0 4 5 4 0
FIXTURE & FITTINGS 58 0 58 0 58 0 58 109 58 0
JANITOR SERVICE 93 0 93 0 93 0 93 30 93 0
CLEANING CONTRACT 468 0 468 0 468 0 468 493 468 0
CLEANING MATERIALS 60 0 60 0 60 0 60 11 60 0
HEALTH & HYGIENE MATERIALS 0 0 0 0 0 0 0 0 0 0
WINDOW CLEANING 16 0 16 0 16 0 16 28 16 0
PEST CONTROL 122 0 122 0 122 0 122 83 122 0
REFUSE UPLIFT 0 0 0 0 0 0 0 18 0 0
REMOVAL & STORAGE COSTS 14 0 14 0 14 0 14 17 14 0
OTHER PROPERTY COSTS 35 0 35 0 35 0 35 8 35 0
PROPERTY COSTS 59,203 0 59,203 0 59,203 0 60,703 28,749 60,251 452
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 1,365 0 1,365 0 1,365 0 1,365 109 1,365 0
I.T. EQUIPMENT MAINT-CONTRACT 74 0 74 0 74 0 74 0 74 0
EQUIPMENT, APPARATUS AND TOOLS 13 0 13 0 13 0 13 15 13 0
ADAPTATIONS FOR CLIENTS 0 0 0 0 0 0 0 49 0 0
FURNITURE - OFFICE 10 0 10 0 10 0 10 2 10 0
FURNITURE - GENERAL 0 0 0 0 0 0 0 3 0 0
MATERIALS 0 0 0 0 0 0 0 98 0 0
MATERIALS, APPARATUS AND EQUIPMENT 0 0 0 0 0 0 0 4 0 0
PROVISIONS 2 0 2 0 2 0 2 5 2 0
FOOD PURCHASES 0 0 0 0 0 0 0 0 0 0
BEVERAGES 4 0 4 0 4 0 4 0 4 0
PROTECTIVE CLOTHING & UNIFORMS 12 0 12 0 12 0 12 3 12 0
LAUNDRY COSTS 16 0 16 0 16 0 16 0 16 0
OTHER SUPPLIES AND SERVICES 32 0 32 0 32 0 32 8 32 0
HEALTH AND SAFETY 15 0 15 0 15 0 15 0 15 0
CATERING - CONTRACT 0 0 0 0 0 0 0 0 0 0
CATERING - OUTWITH CONTRACT 0 0 0 0 0 0 0 0 0 0
OUTSOURCED MAIL 0 0 0 0 0 0 0 7 0 0
DELIVERY CHARGE 0 0 0 0 0 0 0 0 0 0
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 0 0 0
SUPPLIES AND SERVICES 1,543 0 1,543 0 1,543 0 1,543 303 1,543 0
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 10 0 0
POOL CAR RECHARGE - RENTAL CHARGE 26 0 26 0 26 0 26 3 26 0
POOL CAR RECHARGE - FUEL 6 0 6 0 6 0 6 0 6 0
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0 1 0 1 0 1 0
OTHER TRANSPORT COSTS 0 0 0 0 0 0 0 3 0 0
FLEET SERVICE CHARGES 135 0 135 0 135 0 135 33 115 20
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 23 0 23 0 23 0 23 19 23 0
STORAGE 4 0 4 0 4 0 4 0 4 0
TAXI CHARGES - CONTRACTED 0 0 0 0 0 0 0 0 0 0
TRANSPORT AND PLANT 195 0 195 0 195 0 195 68 175 20
77

Page 78

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Housing Revenue Account Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 79 0 79 0 79 0 79 69 79 0
BULK PRINTING 68 0 68 0 68 0 68 0 68 0
TELEPHONES 95 0 95 0 95 0 95 26 95 0
MOBILE PHONES 34 0 34 0 34 0 34 4 34 0
ADVERTISING - OTHER 12 0 12 0 12 0 12 0 12 0
POSTAGES/COURIERS 171 0 171 0 171 0 171 54 171 0
SMS MESSAGING 0 0 0 0 0 0 0 5 0 0
MEMBERSHIP FEES/SUBSCRIPTIONS 38 0 38 0 38 0 38 0 38 0
MEDICAL COSTS 25 0 25 0 25 0 25 5 25 0
LEGAL EXPENSES 6 0 6 0 6 0 6 33 6 0
PETTY OUTLAYS 4 0 4 0 4 0 4 0 4 0
HOSPITALITY / CIVIC RECOGNITION 0 0 0 0 0 0 0 0 0 0
GIRO BANK AGENCY FEES 4 0 4 0 4 0 4 0 4 0
PAYPOINT AGENCY FEES 13 0 13 0 13 0 13 21 13 0
INTERNET AGENCY FEES 3 0 3 0 3 0 3 0 3 0
OTHER ADMIN COSTS 15 0 15 0 15 0 15 7 15 0
CONFERENCES - OFFICIALS 7 0 7 0 7 0 7 0 7 0
INTERNAL SUPPORT SERVICES ALLOCATION 5,020 0 5,020 0 5,020 0 5,020 0 5,020 0
ADMINISTRATION 5,594 0 5,594 0 5,594 0 5,594 224 5,594 0
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,909 0 2,909 0 2,909 0 2,909 1,052 2,909 0
OTHER LOCAL AUTHORITIES 0 0 0 0 0 0 0 0 0 0
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 3 0 3 0 3 0 3 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 0 31 0 31 0 31 (16) 10 21
PAYMENTS TO OTHER BODIES 32 0 32 0 32 0 32 15 10 22
PRIVATE INDIVIDUALS - GENERAL 0 0 0 0 0 0 0 23 0 0
PAYMENT TO OTHER BODIES 2,975 0 2,975 0 2,975 0 2,975 1,074 2,932 43
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 0 0 0 0 0 0
PAYMENT TO PRIVATE CONTRACTOR 80 0 80 0 80 0 80 50 80 0
PAYMENT TO EXTERNAL CONSULTANTS 20 0 20 0 20 0 20 77 20 0
PAYMENT TO CONTRACTORS 100 0 100 0 100 0 100 127 100 0
FINANCING CHARGES
INTEREST-DEBT CHARGES 10,729 0 10,729 0 10,729 0 10,728 0 10,143 585
DEPRECIATION-CAP CHARGES 0 0 0 0 0 0 0 0 0 0
I.T. EQUIPMENT LEASING-CONTRACT 67 0 67 0 67 0 67 3 67 0
CFCR 33,506 0 33,506 0 33,506 0 33,506 0 33,506 0
INTEREST ON REVENUE BALANCES (67) 0 (67) 0 (67) 0 (1,567) 0 (1,713) 146
FINANCING CHARGES 44,235 0 44,235 0 44,235 0 42,734 3 42,003 731
TOTAL EXPENDITURE 127,627 0 127,627 0 127,627 0 127,626 37,447 126,761 865
INCOME
SALES - DEPARTMENTS OF THE AUTHORITY (885) 0 (885) 0 (885) 0 (885) (132) (885) 0
FEES AND CHARGES - GENERAL (4,747) 0 (4,747) 0 (4,747) 0 (4,747) (2,912) (4,652) (95)
RENTAL INCOME (461) 0 (461) 0 (461) 0 (461) 0 (461) 0
HOUSE RENTS (111,802) 0 (111,802) 0 (111,802) 0 (111,801) (51,785) (111,753) (48)
LOCK UP RENTS (2,802) 0 (2,802) 0 (2,802) 0 (2,802) (1,396) (2,798) (4)
INSURANCE RECOVERIES (250) 0 (250) 0 (250) 0 (250) 2,655 (250) 0
OTHER INCOME (1,734) 0 (1,734) 0 (1,734) 0 (1,734) (1,014) (1,734) 0
REALLOCATION OF SUPPORT COSTS (717) 0 (717) 0 (717) 0 (717) 0 (717) 0
YEAR END T/FER TO BALANCE SHEET (4,229) 0 (4,229) 0 (4,229) 0 (4,229) 0 (3,511) (718)
INCOME (127,627) 0 (127,627) 0 (127,627) 0 (127,626) (54,584) (126,761) (865)
NET EXPENDITURE 0 0 0 0 0 0 0 (17,137) 0 0
78

Page 79

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 3 October 2024 (No.7)
Social Work Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Performance and Support Services 5.806 5.727 0.079 1.36% 2.543
Children and Families 48.199 48.687 (0.488) (1.01%) 22.747
Adults and Older People 180.460 180.460 0.000 0.00% 88.400
Justice and Substance Misuse 0.735 0.326 0.409 55.65% 0.194
Total Social Work Resources 235.200 235.200 0.000 0.00% 113.884
5
79

Page 80

Social Work Resources Variance Analysis 2024/25 (Period 7) 
Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs  991k under  Admin & Clerical Staff – 399k under 
Managerial Support Specialist Staff -
(1,429k) over 
Performance and
Support – 114k under 
Adult and Older People –
196k under 
Justice – 77k under 
Children and Families –
107k under 
Adult and Older People –
(1,780k) over 
The underspend relates to
staffing vacancies which are
being filled. 
This relates to underspends to
Scheduling Assistant vacancies
in Homecare, which are being
recruited. This is offset by
overtime costs for Managerial
Support Specialist Staff (below). 
In addition funding allocated for
staffing required at the end of the
A2D capital programme is only
required in part in 24/25 but
required in full in 25/26. 
The underspend relates to
staffing vacancies which are
being filled. 
This is a result of vacancies
which are actively being
recruited. 
This overspend is a result of
turnover being less than
anticipated to date, and overtime
spend to cover the Scheduling
Assistant vacancies in Homecare
(above).
80

Page 81

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.)    
Basic Grade Social Workers – 1,940k
under 
Instructors – 344k under 
Care Staff – (730k) over 
Home Carers – 475k under 
Justice – 160k under 
Children and Families 
- 461k under 
Adult and Older People –
1,303k under 
Justice – 88k under 
Adult and Older People – 
290k under 
Children and Families –
(319k) over 
Adult and Older People –
(535k) over 
Adult and Older People –
474k under 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are being actively
recruited. 
This overspend is due to the level
of overtime being incurred to
manage staff absences due to
sickness and maternity leave. 
This overspend is due to
overtime worked because of In
House Residential vacancies. 
This is a result of vacancies
which are being actively
recruited.
81

Page 82

Subjective Head Variance Subjective line Service / amount Explanation
Property Costs 183k under Gas – 341k under  Adult and Older People –
341k under 
The underspend reflects a
reduction in consumption and
price. 
Transport and
Plant
(935k) over Pool Car Recharge – Rental Charges –
(100k) over 
Fleet Service Charges - (792k) over
Children and Families –
(100k) over 
Adult and Older People –
(792k) over 
The overspend reflects increases
demand. 
The projected overspend reflects
the current spend on Fleet buses
however an action plan is in place
to reduce spend.  This will
continue to be monitored.
Administration (158k) over Mobile Phones – 153k over  Adult and Older People –
153k over
The overspend relates to the
replacement of mobiles devices. 
Payment to Other
Bodies 
358k under  Payments to Voluntary Organisations –
141k under 
Payments to Other Bodies – 197k
under 
Children and Families –
141k under 
Children and Families –
206k under 
This underspend is planned as
part of the budget recovery plan
within Children and Family. 
This underspend is planned as
part of the budget recovery plan
within Children and Family. 
82

Page 83

Subjective Head Variance Subjective line Service / amount Explanation
Payment to Other
Bodies (cont.) 
Private Individuals – General Supported
Carers – 151k under 
Social Work - Foster Parents – (264k)
over 
Social Work - Adoption Allowance –
Default – (208k) over 
Direct Payments – 348k under 
Children and Families –
151k under 
Children and Families –
(264k) over 
Children and Families –
(208k) over 
Adult and Older People –
348k under
There has been a reduction in the
number of supported carers and
the service has a planned
recruitment drive to attract new
carers. 
The overspend is attributable to
the requirement to purchase
external foster placements. 
This overspend relates to the
increasing number of adoptive
carers being paid an ongoing
adoption allowance. The scheme
is currently being reviewed. 
The underspend reflects current
demand of Direct Payments. 
Payment to
Contractors 
Transfer
Payments 
197k under 
(1,069k) over
Day Care – (68k) over 
Home Support – 297k under 
Direct Assistance to Persons Kinship
Care – (1,069k) over 
Adult and Older People –
(68k) over 
Adult and Older People –
297k under 
Children and Families –
(1,049k) over 
The overspend reflect additional
demand for services. 
This underspend is a result of
transitional funding being less
than required in year.  The
funding is required in full next
financial year. 
This overspend relates to the
payment of kinship care
allowances, where demand is
increasing.
83

Page 84

* The underlined variances represent new variances since the last report. 
Subjective Head Variance Subjective line Service / amount Explanation
Income 489k over
recovered
Contributions From Other Bodies -
Default – 290k over recovered 
Fees and Charges – General – 167k
over recovered 
Children and Families –
290k over recovered 
Adult and Older People –
148k over recovered 
This over recovery is due to the
level of Unaccompanied Asylum-
Seeking Children (UASC) income
being received for children
seeking asylum. 
This over recovery relates to non-
recurring income received in
respect of recovery of prior year
care costs from service users. 
84

Page 85

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Social Work Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
ADMIN & CLERICAL STAFF - APT&C BASIC 5,801 0 5,160 640 5,174 626 5,880 2,490 5,364 516
ADMIN & CLERICAL STAFF - APT&C OVERTIME 0 0 176 (176) 237 (237) 0 94 184 (184)
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 367 0 307 60 311 57 386 163 316 70
ADMIN & CLERICAL STAFF - APT&C NIC 408 0 414 (6) 427 (19) 435 209 438 (3)
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 23,435 0 24,501 (719) 25,192 (1,164) 24,226 12,361 25,118 (892)
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 46 0 561 (515) 566 (520) 46 309 625 (579)
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 1,500 0 1,468 106 1,523 88 1,627 772 1,501 126
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 2,467 0 2,708 (206) 2,838 (310) 2,550 1,344 2,634 (84)
BASIC GRADE SOCIAL WORKERS BASIC 13,412 0 11,985 1,529 11,542 1,972 13,840 5,932 12,333 1,507
BASIC GRADE SOCIAL WORKERS OVERTIME 44 0 133 (89) 128 (84) 44 50 99 (55)
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 921 0 711 227 668 269 960 371 692 268
BASIC GRADE SOCIAL WORKERS NIC 1,428 0 1,262 177 1,243 196 1,468 637 1,248 220
HOSPITAL SOCIAL WORKERS BASIC 449 0 570 (122) 560 (111) 0 0 0 0
HOSPITAL SOCIAL WORKERS OVERTIME 0 0 1 (1) (1) 1 0 0 0 0
HOSPITAL SOCIAL WORKERS SUPERANNUATION 29 0 35 (6) 40 (11) 0 0 0 0
HOSPITAL SOCIAL WORKERS NIC 46 0 63 (17) 61 (15) 0 0 0 0
INSTRUCTORS BASIC 1,512 0 1,278 233 1,298 214 1,513 607 1,223 290
INSTRUCTORS SUPERANNUATION 98 0 71 27 75 23 98 38 70 28
INSTRUCTORS NIC 136 0 115 21 116 20 136 54 110 26
CARE STAFF - APT&C BASIC 18,267 0 17,314 (214) 17,481 (378) 16,485 8,458 16,769 (284)
CARE STAFF - APT&C OVERTIME 745 0 1,110 (563) 1,041 (494) 487 414 1,017 (530)
CARE STAFF - APT&C SUPERANNUATION 1,181 0 965 132 979 118 1,032 527 947 85
CARE STAFF - APT&C NIC 1,815 0 1,666 21 1,696 (9) 1,588 822 1,589 (1)
HOME CARERS BASIC 28,132 0 27,418 1,439 27,468 1,290 28,083 12,965 27,392 691
HOME CARERS OVERTIME 1,907 0 1,425 (244) 1,516 (335) 1,181 636 1,635 (454)
HOME CARERS SUPERANNUATION 1,819 0 1,719 99 1,665 154 1,766 756 1,634 132
HOME CARERS NIC 2,846 0 2,613 233 2,645 201 2,763 1,292 2,657 106
TRAVEL AND SUBSISTENCE 0 0 0 0 0 0 0 1 0 0
OTHER EMPLOYEE COSTS 2,463 0 3,803 1 3,683 (6) 3,580 308 3,588 (8)
PENSION INCREASES 328 0 328 0 328 0 328 135 328 0
EMPLOYEE COSTS 111,602 0 109,880 2,067 110,500 1,536 110,502 51,745 109,511 991
PROPERTY COSTS
RATES 345 0 345 0 345 0 355 366 395 (40)
SCOTTISH WATER - UNMETERED CHARGES 35 0 35 0 35 0 35 0 35 0
SCOTTISH WATER - METERED CHARGES 166 0 166 0 166 0 151 68 162 (11)
RENT 523 0 523 0 523 0 523 320 523 0
SERVICE CHARGE 0 0 0 0 0 0 1 0 0 1
OTHER ACCOMODATION COSTS 0 0 0 0 0 0 0 1 0 0
PROPERTY INSURANCE 292 0 292 0 292 0 292 0 292 0
SECURITY COSTS 2 0 2 0 2 0 2 7 5 (3)
GROUND MAINTENANCE 3 0 3 0 3 0 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 2 0 2 0 2 0 2 11 4 (2)
LIFE CYCLE MAINTENANCE 0 0 0 0 0 0 0 1 1 (1)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 63 0 64 (1) 63 0 50 39 73 (23)
ELECTRICITY  - CONTRACT 851 0 852 0 851 1 757 179 788 (31)
GAS 996 0 679 376 655 376 931 439 590 341
FIXTURE & FITTINGS 0 0 0 0 0 0 0 4 0 0
JANITOR SERVICE 0 0 0 0 0 0 0 1 0 0
CLEANING CONTRACT 385 0 381 0 375 0 374 378 374 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 283 0 224 (1) 217 (1) 191 51 193 (2)
HEALTH & HYGIENE MATERIALS 91 0 92 (1) 112 0 97 47 93 4
WINDOW CLEANING 11 0 11 0 11 0 10 4 11 (1)
PEST CONTROL 0 0 0 0 0 0 0 0 0 0
REFUSE UPLIFT 43 0 43 0 43 0 40 27 43 (3)
REMOVAL & STORAGE COSTS 1 0 1 0 1 0 1 10 8 (7)
OTHER PROPERTY COSTS 194 0 180 0 172 0 164 89 203 (39)
PROPERTY COSTS 4,286 0 3,895 373 3,868 376 3,976 2,042 3,793 183
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 921 0 763 0 763 0 753 356 755 (2)
COMPUTER EQUIPMENT MAINTENANCE 51 0 41 (1) 39 1 40 9 39 1
I.T. EQUIPMENT MAINT-CONTRACT 228 0 200 1 200 1 199 4 199 0
I.T. ELECTRONIC MESSAGING 258 0 122 0 107 0 97 0 97 0
EQUIPMENT, APPARATUS AND TOOLS 122 0 122 0 122 0 111 26 110 1
SMALL TOOLS 4 0 3 1 4 (1) 4 2 4 0
AIDS FOR CLIENTS 818 0 973 0 973 0 873 171 874 (1)
ADAPTATIONS FOR CLIENTS 964 0 964 0 964 0 963 240 964 (1)
SUPPLIES FOR CLIENTS 353 0 364 (2) 361 1 356 98 356 0
FURNITURE - OFFICE 1 0 1 0 1 0 1 8 1 0
FURNITURE - GENERAL 0 0 0 0 0 0 0 1 0 0
FURNISHINGS (INCL. CROCKERY & LINEN) 17 0 17 0 17 0 15 8 15 0
MATERIALS 10 0 10 0 10 (1) 10 0 10 0
MATERIALS, APPARATUS AND EQUIPMENT 1 0 1 0 1 0 1 6 2 (1)
PROVISIONS - GENERAL 213 0 213 0 213 0 210 109 212 (2)
FOOD PURCHASES WITHIN CONTRACT SERVICE 513 0 513 (1) 517 0 425 226 451 (26)
BEVERAGES 60 0 60 0 60 0 50 20 52 (2)
SCHOOL MILK 41 0 41 0 41 0 33 18 35 (2)
PROTECTIVE CLOTHING & UNIFORMS 1,355 0 1,337 (39) 1,276 0 1,146 626 1,160 (14)
LAUNDRY COSTS 4 0 4 0 4 0 3 10 3 0
OTHER SUPPLIES AND SERVICES 47 0 48 (1) 51 (4) 45 30 50 (5)
CATERING - CONTRACT 372 0 372 0 372 0 372 334 372 0
CATERING - OUTWITH CONTRACT 55 0 57 (2) 55 0 52 8 53 (1)
MAJOR SUPPLY OF ELECTRICAL POWER 0 0 0 0 0 0 0 0 0 0
OUTSOURCED MAIL 0 0 0 0 0 0 0 1 0 0
DELIVERY CHARGE 0 0 0 0 0 0 0 9 0 0
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 0 0 0
I- PROCUREMENT ERRORS 0 0 0 0 0 0 0 2 0 0
SUPPLIES AND SERVICES 6,408 0 6,226 (44) 6,151 (3) 5,759 2,322 5,814 (55)
85

Page 86

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Social Work Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 4 4 (4)
FLEET SERVICES - VEHICLE HIRE 0 0 0 0 0 0 0 0 0 0
POOL CAR CHARGES-RENTAL 119 0 156 (1) 155 0 155 115 255 (100)
POOL CAR CHARGES-FUEL 39 0 20 (1) 19 1 19 0 19 0
POOL CAR CHARGES-ADDITIONAL COSTS 7 0 3 0 3 0 3 0 3 0
OTHER TRANSPORT COSTS 904 0 949 (14) 1,001 (61) 939 339 978 (39)
INSURANCE 24 0 24 0 24 0 24 0 24 0
FLEET SERVICES 0 0 0 0 0 0 0 0 0 0
FLEET SERVICE CHARGES 3,120 0 3,753 (629) 3,773 (626) 3,147 416 3,939 (792)
HIRE OF EXTERNAL VEHICLES 7 0 7 0 7 0 7 0 7 0
HIRE OF EXTERNAL PLANT 0 0 0 0 0 0 0 3 0 0
HIRE OF SKIPS 0 0 0 0 0 0 0 1 0 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 1 0 0
PUPIL TRANSPORT - STRATHCLYDE PASS 0 0 0 0 0 0 0 2 0 0
PUPIL TRANSPORT - OTHER 10 0 10 0 10 0 10 5 10 0
TRANSPORT AND PLANT 4,230 0 4,922 (645) 4,992 (686) 4,304 886 5,239 (935)
ADMINISTRATION
PRINTING AND STATIONERY 101 0 101 0 99 2 97 43 98 (1)
TELEPHONES 205 0 206 0 205 1 202 11 203 (1)
MOBILE PHONES 613 0 285 0 295 (10) 285 9 438 (153)
ADVERTISING - RECRUITMENT 4 0 4 0 4 0 4 0 4 0
ADVERTISING - OTHER 10 0 10 0 10 (1) 10 0 10 0
POSTAGES/COURIERS 53 0 53 (1) 53 0 53 26 53 0
SMS MESSAGING 0 0 0 0 0 0 0 0 0 0
MEMBERSHIP FEES/SUBSCRIPTIONS 53 0 53 (1) 53 (1) 53 25 53 0
INSURANCE 27 0 27 0 27 0 27 0 27 0
MEDICAL COSTS 26 0 35 (9) 26 0 26 36 27 (1)
LEGAL EXPENSES 298 0 298 0 320 (22) 297 77 299 (2)
HOSPITALITY / CIVIC RECOGNITION 6 0 5 0 5 0 5 1 5 0
SECURITY UPLIFT FEES 0 0 0 0 0 0 0 1 0 0
OTHER ADMIN COSTS 55 0 55 (1) 55 0 55 11 55 0
CONFERENCES - OFFICIALS (incl associated costs) 7 0 7 (1) 7 0 7 0 7 0
TRAINING 44 0 44 0 44 0 44 23 44 0
INTERNAL SUPPORT SERVICES ALLOCATION 410 0 410 0 410 0 410 0 410 0
ADMINISTRATION 1,912 0 1,593 (13) 1,613 (31) 1,575 263 1,733 (158)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 55 0 55 0 55 0 55 0 55 0
OTHER LOCAL AUTHORITIES 25 0 25 0 25 0 25 0 25 0
GRANTS TO VOLUNTARY ORGANISATIONS 23 0 23 0 23 0 23 12 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 2,454 0 2,757 (2) 2,604 151 2,248 982 2,107 141
PAYMENTS TO OTHER BODIES 2,385 0 2,382 0 2,226 86 2,304 759 2,107 197
PAYMENTS TO HEALTH BOARD 1,508 0 1,508 1 1,508 0 1,508 108 1,515 (7)
PRIVATE INDIVIDUALS - GENERAL 1,107 0 1,103 (2) 940 161 1,102 470 951 151
SOCIAL WORK - FOSTER PARENTS 6,483 0 6,482 0 6,658 (175) 6,528 3,446 6,792 (264)
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 0 94 0 94 0 94 36 94 0
SOCIAL WORK - ADOPTION ALLOWANCES 650 0 750 (100) 889 (239) 650 616 858 (208)
DIRECT PAYMENTS 10,899 0 10,642 236 10,656 222 10,878 5,242 10,530 348
PAYMENT TO OTHER BODIES 25,683 0 25,821 133 25,678 206 25,415 11,671 25,057 358
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 0 0 0 6 6 (6)
PAYMENT TO PRIVATE CONTRACTOR 0000-DEFAULT 374 0 1,177 0 1,177 0 2,205 117 2,205 0
PAYMENT TO PRIVATE CONTRACTOR - MISC 35 0 0 0 0 0 0 0 0 0
PAYMENT TO PRIVATE CONTRACTOR - PAYMENTS TO VOL ORGS 73,216 0 73,645 0 73,360 285 74,305 33,700 74,327 (22)
PAYMENT TO PRIVATE CONTRACTOR - CET ALLOCATION - HOME CARE 34,711 0 34,153 (1) 34,153 0 33,846 15,257 33,846 0
PAYMENT TO PRIVATE CONTRACTOR - SECURE ACCOMMODATION 584 0 584 0 597 0 615 555 615 0
PAYMENT TO PRIVATE CONTRACTOR - RESPITE 1,978 0 2,048 (2) 2,071 (25) 2,046 (503) 2,046 0
PAYMENT TO PRIVATE CONTRACTOR - CARE COMMISSION COSTS 0 0 0 0 0 0 0 0 0 0
PAYMENT TO PRIVATE CONTRACTOR - DAY CARE 1,088 0 1,410 (322) 1,335 (259) 1,076 499 1,144 (68)
PAYMENT TO PRIVATE CONTRACTOR - HOME SUPPORT 23,426 0 23,764 (918) 23,683 (781) 23,202 10,831 22,905 297
PAYMENT TO PRIVATE CONTRACTOR - EMPLOYMENT TRAINING 55 0 55 0 55 0 55 21 55 0
PAYMENT TO PRIVATE CONTRACTOR - OTHER INCENTIVES 0 0 0 0 0 0 0 0 0 0
PAYMENT TO PRIVATE CONTRACTOR - FREE PERSONAL NURSING CARE 9,135 0 9,135 0 9,135 0 9,135 2,938 9,135 0
PAYMENT TO PRIVATE CONTRACTOR - HOSPITAL DISCHARGE 61 0 18 0 18 0 0 0 0 0
PAYMENT TO PRIVATE CONTRACTOR - C & F - OUT OF SCHOOL SERVICE 0 0 0 0 0 0 18 16 18 0
PAYMENT TO PRIVATE CONTRACTOR - RESPITE AWAITING LONG TERM CARE 253 0 253 0 253 0 0 (120) 0 0
PAYMENT TO PRIVATE CONTRACTOR - P.A. (COLLEGE) 1,023 0 1,023 0 1,030 0 260 120 260 0
PAYMENT TO PRIVATE CONTRACTOR - GROUPWORK/SOCIAL SUPPORT 424 0 419 (1) 418 0 1,030 476 1,030 0
PAYMENT TO PRIVATE CONTRACTOR - CARER RESPITE 0 0 0 0 0 0 418 194 418 0
PAYMENT TO PRIVATE CONTRACTOR - COVID 19 ADDITIONAL COSTS 0 0 0 0 0 0 0 (1) 0 0
PAYMENT TO PRIVATE CONTRACTOR - INTERIM CARE 0 0 0 0 0 0 0 (11) 0 0
PAYMENT TO PRIVATE CONTRACTOR - REFUSE DISPOSAL 115 0 115 1 115 0 0 3 3 (3)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 0 0 0 115 51 116 (1)
SLC MANAGED 0 0 0 0 0 0 0 2 0 0
PAYMENT TO CONTRACTORS 146,478 0 147,799 (1,243) 147,400 (780) 148,326 64,151 148,129 197
TRANSFER PAYMENTS
WORK EXPERIENCE 3,553 0 4,139 (567) 4,419 (847) 0 0 0 0
DIRECT ASSISTANCE TO PERSONS 83 0 32 0 32 0 3,572 2,600 4,641 (1,069)
SECTION PAYMENTS 0 0 0 0 0 0 31 64 31 0
TRANSFER PAYMENTS 3,636 0 4,171 (567) 4,451 (847) 3,603 2,664 4,672 (1,069)
86

Page 87

South Lanarkshire Council
Period 3 Period 3 Period 4 Period 4 Period 5 Period 5 Revised Period 7 Period 7 Period 7
Social Work Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
FINANCING CHARGES
DEPRECIATION-CAP CHARGES 1 0 1 0 1 0 0 0 0 0
LEASING CHARGES - FINANCE 0 0 0 0 0 0 1 0 1 0
LEASING CHARGES - OPERATIONAL 395 0 395 0 395 0 (1) 0 (1) 0
I.T. EQUIPMENT LEASING-CONTRACT 0 0 0 0 0 0 393 19 394 (1)
FINANCING CHARGES 396 0 396 0 396 0 393 19 394 (1)
TOTAL EXPENDITURE 304,631 0 304,703 61 305,049 (229) 303,853 135,763 304,342 (489)
INCOME
NON RELEVANT GOVERNMENT GRANT (8,180) 0 (8,510) 0 (8,510) 0 (8,510) (3,788) (8,510) 0
RECOVERY FROM TRUNK ROAD PROJECT 0 0 0 0 0 0 0 0 0 0
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (25,085) 0 (25,039) 0 (25,039) 0 (25,039) (12,517) (25,039) 0
CONTRIBUTIONS FROM OTHER BODIES (1,619) 0 (1,619) 0 (1,859) 240 (807) (703) (1,097) 290
SALES - GENERAL 0 0 0 0 0 10 0 0 0 0
SALES - SALE OF MEALS (14) 0 (14) 0 (24) (33) (14) (19) (24) 10
FEES AND CHARGES - GENERAL (7,904) 0 (7,649) (67) (7,682) 10 (6,928) (4,289) (7,095) 167
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (656) 0 (656) 1 (639) 0 (639) (55) (639) 0
CHARGES TO HEALTH BOARDS (26,334) 0 (26,334) 0 (26,417) 0 (25,932) (436) (25,932) 0
FEES AND CHARGES - OTHER BODIES 0 0 (4) 0 (4) 0 (4) 0 (4) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (218) 0 (221) 4 (218) 1 (218) 0 (218) 0
RENTAL INCOME (27) 0 (27) 1 (27) 1 (27) (7) (27) 0
OTHER INCOME (235) 0 (235) 0 (235) 0 (135) (65) (157) 22
REALLOCATION OF SUPPORT COSTS (400) 0 (400) 0 (400) 0 (400) 0 (400) 0
INCOME TOTAL (70,672) 0 (70,708) (61) (71,054) 229 (68,653) (21,879) (69,142) 489
NET EXPENDITURE 233,959 0 233,995 0 233,995 0 235,200 113,884 235,200 0
87

Page 88

88