Agenda Document Pack - Financial Resources Scrutiny Forum - 12/09/2024

South Lanarkshire Council · 12 September 2024
Back to Financial Resources Scrutiny Forum — 12 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 04 September 2024 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 12 September 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Grant Ferguson (Chair), Julia Marrs (Depute Chair), Mathew Buchanan, Colin Dewar, Ross
Gowland, Gavin Keatt, Richard Lockhart, Monique McAdams, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Financial Resources Scrutiny Forum held on 15
August 2024 submitted for approval as a correct record.  (Copy attached) 
3 - 10 
Item(s) for Monitoring 
3a  Capital Budget Monitoring 2024/2025 - General Fund Capital Programme
Report dated 22 August 2024  by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
11 - 30 
3b  Capital Budget Monitoring 2024/2025  - Housing Capital Programme
Report dated 22 August 2024  by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
31 - 36 
4 Revenue Budget Monitoring 2024/2025
Report dated 7 August 2024  by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
37 - 42 
5 Revenue Budget Monitoring 2024/2025 - Detailed Resource Analysis
Report dated 7 August 2024  by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
43 - 84 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

FINANCIAL RESOURCES SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 15 August 2024 
Chair:
Councillor Grant Ferguson 
Councillors Present:
Councillor Mathew Buchanan, Councillor Colin Dewar, Councillor Ross Gowland, Councillor Richard
Lockhart, Councillor Julia Marrs (Depute), Councillor Monique McAdams, Councillor Carol Nugent 
Councillor’s Apology:
Councillor Gavin Keatt 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); S Jessup, Administration Assistant; E-A McGonigle,
Administration Adviser; L O’Hagan, Head of Finance (Strategy)
Housing and Technical Resources
D Craig, Property Manager (Commercial); A Roxburgh, Project Manager 
Chair’s Opening Remarks
The Chair:- 
 congratulated Lorraine O’Hagan on her recent appointment as Head of Finance (Strategy)
 welcomed Graham Booth to his first meeting of the Forum in his role as Finance Manager
(Strategy) 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Financial Resources Scrutiny Forum held on 28 March 2024
were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3 Capital Budget Monitoring 2023/2024 – General Fund Capital Programme 
A report dated 23 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the position of the General Fund Capital Programme 2023/2024 for the period 1
April 2023 to 31 March 2024. 
The General Services Capital Programme for 2023/2024 totalled £78.365 million.  This revised
programme consisted of the base budget plus carry forward projects and adjustments that had
been agreed by the Executive Committee up to and including the meeting held on 8 May 2024. 
2
3

Page 4

Total spend on the General Fund Capital Programme of £64.244 million was detailed in
Appendix A to the report.  This was compared to the budget of £78.365 million and resulted in
an underspend of £14.121 million which would be carried forward into financial year 2024/2025. 
This underspend related to projects within Community and Enterprise Resources (£11.241
million), Finance and Corporate Resources (£0.684 million) and Housing and Technical
Resources (£3.771 million).  Greater spend than anticipated was achieved within Education
Resources (£1.257 million) and Social Work Resources (£0.318 million).  The programme
underspend was due to the timing of project spend and the main projects responsible for the
underspend were detailed in Appendix B to the report.  The majority of those projects would
continue into 2024/2025.  Details were also given of year end and accounting adjustments. 
Part of the Council’s Capital funding package included £7.116 million which had been allocated
by the Scottish Government to fund the 2023/2024 pay award.  To facilitate this, the General
Capital Grant has been routed through the Housing Accounts with a subsequent transfer to the
General Services Revenue Account.  This was permitted in the Grant Conditions of the General
Capital Grant letter for 2023/2024 which the Scottish Government had changed for financial year
2023/2024, allowing councils to use the General Capital Grant for revenue spend. 
Officers responded to members’ questions in relation to:- 
 considering the content of the Climate Change, Sustainability and Environmental
Implications section of the reports of this Forum
 the level of Glasgow City Region City Deal grant
 the South Lanarkshire Leisure and Culture (SLLC) booking and admission system
 Calderglen Country Park one way system and infrastructure, specifically in relation to the
drainage
 Crawforddyke Primary School, Carluke toilet adaptations 
Where information was not readily available, the Head of Finance (Strategy) undertook to
provide this to relevant members. 
The Forum decided: that the final outturn position on the 2023/2024 General
Capital Fund Programme be noted. 
[Reference: Minutes of 28 March 2024 (Paragraph 3a) and Minutes of the Executive Committee
of 8 May 2024 (Paragraph 4) and 26 June 2024 (Paragraph 5)] 
4 Capital Budget Monitoring 2023/2024 – Housing Capital Programme 
A report dated 23 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the position of the Housing Capital Programme 2023/2024 for the period 1 April
2023 to 31 March 2024. 
The revised Housing Capital Programme for 2023/2024 totalled £67.443 million and spend to 31
March 2024 totalled £62.240 million, which represented an underspend of £5.203 million, as
detailed in Appendix A to the report.  The underspend could be attributed to a number of factors
which included:- 
 timing of the purchase of land at sites within the East Kilbride Community Growth Area and
Brackenhill Farm
 access issues with a significant number of central heating system upgrades and windows
and doors projects
4

Page 5

Taking into account the year-end underspend position, this would mean a carry forward of
£5.203 million which would fall into future financial years.  Further analysis of the budget
confirmed that £3.418 million was required in 2024/2025 and the remaining underspend would
be carried into future years.  The Scottish Government’s Affordable Housing grant for 2024/2025
had now been confirmed which had resulted in a reduction of £3.473 million in the 2024/2025
approved programme.  Those adjustments would be added into the Capital Programme as part
of the new year monitoring report. 
The Head of Finance (Strategy) acknowledged a member’s comment in relation to expanding on
the Climate Change, Sustainability and Environmental Implications section of the report. 
The Forum decided: that the final outturn position on the 2023/2024 Housing
Capital Programme be noted. 
[Reference: Minutes of 28 March 2024 (Paragraph 3b) and Minutes of the Executive Committee
of 26 June 2024 (Paragraph 5)] 
5 Capital Budget Monitoring 2024/2025 – General Fund Capital Programme 
A report dated 25 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the position of the General Capital Programme 2024/2025 for the period 1 April to
14 June 2024. 
On 21 February 2024, the Council approved a General Services base budget of £49.512 million
for 2024/2025.  Since then, further amendments had been approved, along with financial year
end and additional funding received, which resulted in a revised General Services base budget
position for 2024/2025 of £73.850 million.  This was a net increase of £24.338 million.  A full list
of those adjustments was detailed in Appendix A to the report.   
During financial year 2024/2025, Resources had advised of adjustments required to the
programme.  The revised programme for the year totalled £85.248 million which was a net
increase of £11.398 million.  Those further adjustments had been approved by the Executive
Committee on 26 June 2024 and 7 August 2024 and were detailed in appendices B and C
respectively. 
The programme spend and funding for the General Fund was summarised in Appendix D to the
report. 
Budget for the period was £9.998 million and spend to 14 June 2024 was £5.131 million. Actual
funding received at 14 June 2024 was £43.214 million. 
The physical progress achieved with the General Fund Capital Programme 2024/2025 at 14
June 2024 was detailed in appendices E to G of the report. 
The Head of Finance (Strategy) responded to members’ questions in relation to:- 
 the play park money from the Scottish Government 
 Hairmyres Station Park and Ride and the ongoing discussions with Transport Scotland
regarding the £2 million shortfall in funding
 the in-year cost of borrowing to facilitate the £7.2 million of capital investment in roads and
the costs incurred on the £1.8 million being borrowed in 2024/2025 
Where information was not readily available, the Head of Finance (Strategy) undertook to
provide this to relevant members.
5

Page 6

The Forum decided: that the position on the General Fund Capital Programme
as at 14 June 2024 be noted. 
[Reference: Minutes of South Lanarkshire Council of 21 February 2024 (Paragraph 3) and
Minutes of the meetings of the Executive Committee of 26 June 2024 (Paragraph
6) and 7 August 2024 (Paragraph 4)] 
6 Capital Budget Monitoring 2024/2025 – Housing Capital Programme
A report dated 25 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the progress of the Housing Capital Programme 2024/2025 at 14 June 2024
(Period 3). 
On 21 February 2024, the Council had approved a Housing Capital Programme for 2024/2025,
including funding carried forward from previous years, which totalled £77.303 million. 
As reported in the final outturn report for 2023/2024, there was a carry forward of £5.203 million
into future years.  Further analysis of this budget confirmed that £3.418 million was required in
2024/2025, with the remainder being carried forward into future years. 
In addition, the Executive Committee on 26 June 2024 agreed that the 2024/2025 Capital
Programme be reduced by a further £3.473 million to reflect the reduction in the Scottish
Government’s Affordable Housing grant for 2024/2025. 
As a result of those adjustments, the revised programme for 2024/2025 was £77.248 million. 
Programmed funding for the year also totalled £77.248 million and was detailed, along with the
funding sources, in Appendix A to the report. 
The predicted spend position for the Housing Capital Programme for 2024/2025 was £77.248
million.  Actual funding received at 14 June 2024 was £10.075 million. 
The physical progress achieved with the Housing Capital Programme 2024/2025 at 14 June
2024 was detailed in Appendix B to the report. 
The Forum decided: that the position on the Housing Capital Programme as at
14 June 2024 (Period 3) be noted. 
[Reference: Minutes of South Lanarkshire Council of 21 February 2024 (Paragraph 3) and
Minutes of the meetings of the Executive Committee on 26 June 2024 (Paragraph
6) and 7 August 2024 (Paragraph 4)] 
7 Revenue Budget Year-End 2023/2024 
A report dated 25 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
the Housing Revenue Account for the period 1 April 2023 to 31 March 2024.   
Information was provided on:- 
 the Council’s overall probable outturn position previously reported to the Executive
Committee on 24 January 2024 of a breakeven position, which included the corporate
transfer to reserves of £9 million
 the year-end outturn position across Resources, Corporate Items, Loan Charges and
Council Tax, which was an underspend of £0.128 million after proposed transfers to
reserves of £26.223 million.  This included the transfer to reserves approved as part of the 
6

Page 7

 probable outturn of £23.985 million and a proposed additional year-end transfer to
reserves of £2.238 million
 the year-end position within Social Work Resources’ Adult and Older People Services,
which included a £1.446 million commitment in relation to the element of the budget
delegated to the Integration Joint Board (IJB).  This was an increase of £0.174 million from
the predicted outturn position
 the proposal to set aside the £0.128 million underspend to assist in future budget
strategies, including pay award requirements which would result in a breakeven position
 the Housing Revenue Account (HRA) which was a breakeven position after a transfer to
the HRA reserve of £0.360 million 
The Finance Manager (Strategy) responded to members’ questions in relation to £0.174 million
underspend in the element of the Adult and Older People budget delegated to the IJB. 
The Forum decided: 
(1) that across Resources, Corporate Items and Council Tax, the year-end underspend of
£0.128 million after proposed Transfer to Reserves, as detailed at section 4 and Appendix
1 of the report, be noted; 
(2) that an additional £0.174 million underspend in the element of the Adult and Older People
budget, delegated to the Integration Joint Board (IJB), as detailed in paragraph 4.5, which
the Council allowed the IJB to retain within their reserves for future care costs, be noted; 
(3) that the underspend of £0.128 million, which was after the Probable Outturn Transfers to
Reserves of £23.985 million, be noted; 
(4) that the requests for additional year-end Transfers to Reserves totalling £2.238 million, as
detailed in Appendix 4 of the report, be noted; 
(5) that the £0.128 million underspend after proposed Transfers to Reserves be set aside to
assist in future budget strategies, including pay award requirements, as detailed in
paragraph 4.11 of the report, resulting in a breakeven position for the Council, be noted;
and 
(6) that the breakeven position on the Housing Revenue Account, as detailed in section 5 of
the report, be noted. 
[Reference: Minutes of 28 March 2024 (Paragraph 4) and Minutes of the Executive Committee
of 26 June 2024 (Paragraph 4)] 
In terms of Standing Order No 14, the Chair adjourned the meeting at 3.00pm for a 5 minute period.
The meeting reconvened at 3.05pm 
8 Revenue Budget Year-End 2023/2024 – Detailed Resource Analysis 
A report dated 25 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Council’s revenue budget year-end position for 2023/2024. 
Appendices A to F to the report provided the following information for the year-end for each
Resource and the Housing Revenue Account:- 
 an Executive Summary showing the top level position for each of the Services 
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services 
7

Page 8

 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings 
The Forum decided: that the 2023/2024 year-end detailed financial analysis for
each of the individual Resources and the Housing Revenue
Account be noted. 
[Reference: Minutes of 28 March 2024 (Paragraph 5)] 
9 Revenue Budget Monitoring 2024/2025 
A report dated 25 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April to 14 June 2024 and a projection for the year to
31 March 2025. 
As at 14 June 2024, the projected outturn position on the General Fund Revenue Account and
Housing Revenue Account was a breakeven position, as detailed in appendices 1 and 2 to the
report respectively. 
Information was provided on the following key budget areas:- 
 teacher numbers
 employer’s pension contribution increase (teachers)
 school meal debt 
The Forum decided: 
(1) that the projected breakeven position on the General Fund Revenue Account for
2024/2025, and the actual spend as at 14 June 2024, as detailed in section 4 and
Appendix 1 of the report, be noted; and 
(2) that the projected breakeven position on the Housing Revenue Account for 2024/2025,
and the actual spend as at 14 June 2024, as detailed in section 5 and Appendix 2 of the
report, be noted. 
[Reference:  Minutes of the Executive Committee of 7 August 2024 (Paragraph 3)] 
10 Revenue Budget Monitoring 2024/2025 – Detailed Resource Analysis 
A report dated 25 July 2024 by the Executive Director (Finance and Corporate Resources) was
submitted comparing actual expenditure against budgeted expenditure for the period 1 April to
14 June 2024 (Period 3). 
Appendices A to F to the report provided the following information for each Resource and the
Housing Revenue Account:- 
 an Executive Summary showing the top level position for each of the Services within the
Resource and the Housing Revenue Account as at 14 June 2024
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services as at 14 June 2024
 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings as at 14 June 2024 
The Forum decided: that the position as at 14 June 2024 (Period 3) be noted.
8

Page 9

11 Urgent Business 
There were no items of urgent business. 
9

Page 10

10

Page 11

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 September 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2024/2025 - General Fund
Capital Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2024
to 12 July 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the 2024/2025 General Fund
Capital Programme be noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 12 July 2024 from
both a financial and physical perspective. 
3.2. Appendices A to D show the financial position of the General Fund Capital
Programme, with the physical progress detailed in Appendices E to G – as they are
split into Build, Non-Build and Roads. 
4. General Fund Capital Programme 2024/2025
4.1. 2024/25 Budget:  The revised Capital Programme for 2024/2025 totals £86.956
million as shown in Appendix B. The revised programme includes adjustments to the
programme totalling a net increase of £1.708 million, as detailed in Appendix A,
which have been submitted to the Executive Committee on 4 September 2024 for
approval. 
4.2. The funding available to support the programme also totals £86.956 million and is
detailed in Appendix D. 
4.3 2024/2025 Forecast:  The programme spend and funding for the General Fund is
summarised in Appendix D.  As noted in 4.1, the total capital spending programme
for the year is £86.956 million. 
4.3. Appendix D also shows a forecast for the financial year of £86.956 million. 
4.4. 2024/2025 Actual Position:  Actual spend incurred to the 12 July 2024 totals £7.442
million.
3a
11

Page 12

4.5. Actual funding received to 12 July 2024 is £47.585 million. 
4.6. Relevant officers will continue to closely monitor the generation of all income
including receipts. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are included in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 August 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 4 September 2024 
List of Background Papers
 Capital Ledger prints to 12 July 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
12

Page 13

APPENDIX A 
Adjustments Approved by Executive Committee – 4 September 2024 
Community and Enterprise Resources 
Roads Safety Improvement Fund
A grant funding allocation has been received from the Scottish Government to
deliver safe system measures to support casualty and/or risk reduction and to
address key priorities within our road casualty statistics or emerging trends. 
The following projects will be carried out using this funding: 
A70, from A73 Hyndford Rd to A743 Ravenstruther £0.125m
A726, from Torrance Roundabout to Strathaven £0.152m
A706, Forth to Council boundary £0.080m
Hillhouse Road/ Technology Avenue, Hamilton £0.067m
A71 Ayr Road nr. Burnhead Road, Shawsburn £0.073m 
Approval is sought to increase the 2024/2025 Capital Programme by £0.497
million. 
Roads People and Place Local Authority Direct Award
Funding has been made available to support active and sustainable travel
programmes and projects that align with the Active Travel Framework and
contribute to the growth of walking, cycling and wheeling nationwide. 
These monies will fund the following projects: 
High Common Road pedestrian crossing upgrade £0.046m
Main Street/Nairn St. Blantyre pedestrian crossing upgrade  £0.046m
Main Street/Broompark pedestrian crossing upgrade  £0.046m
Cadzow Street pedestrian crossing upgrade (toucan) £0.046m
Portland Square pedestrian crossing upgrade  £0.052m
Traffic/Cycle counter upgrades  £0.025m 
Approval is sought to increase the 2024/25 Capital Programme by £0.261 million
which will be funded by a contribution from Transport Scotland. 
£0.497m 
£0.261m 
13

Page 14

Hairmyres Park and Ride
The tender submission for this project has identified an additional spend
requirement of £0.950 million as result of market conditions. Previous funding
arrangements had relied on the Council borrowing £2 million which would be
reimbursed by Transport Scotland in future years.  Transport Scotland have now
agreed to provide £2.5 million in grant funding this financial year (reflecting an
additional £0.5 million of funding).  The Council will no longer need to borrow
monies up front.     
SPT have also noted their further commitment of up to £0.450 million of funding to
this regional project.  This is in addition to circa £0.350 million of funding
previously provided by SPT.  This will be included in their list of Category 2
projects for next year, should sufficient funding become available (a Category 2
project includes being a project which requires additional funding to ensure that
they are robust and deliverable).  As a contingency for the estimated funding from
SPT not being confirmed next year, the Council's Roads budget would be
required to under-write the £0.450 million. 
In addition, £1.300 million of active travel funding is also earmarked for the active
travel element of this overall project which cumulatively gives an overall project of
£7.2 million. 
Approval is sought to increase the budget by £0.950 million to reflect the £0.500
million additional Transport Scotland funding, and an estimated £0.450 million
from SPT.   
£0.950m  
Minor Adjustments £0.000m  
TOTAL ADJUSTMENTS £1.708m 
14

Page 15

APPENDIX B 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 12 JULY 2024 
£m  
Total Base Budget (including carry forward from 2023/2024) 85.248  
Proposed Adjustments – Period 4 1.708  
Total Revised Budget 86.956     
2024/25
Budget 
Period 4
Proposed
Adjustments 
Revised
2024/25
Budget
Resource £m £m £m    
Community & Enterprise 60.464 1.708 62.172
Education 9.042 - 9.042
Finance & Corporate 3.086 - 3.086
Housing & Technical 11.629 - 11.629
Social Work 1.027 - 1.027    
TOTAL CAPITAL PROGRAMME 85.248 1.708 86.956         
15

Page 16

APPENDIX C 
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 12 JULY 2024 
Resource Name 
Annual
Budget
£000 
2023/24
C/F
£000
Previous
Slippage
/Adjs
£000
Total
Original
Budget
£000 
Proposed
Adjs
£000 
Proposed
Slippage
£000 
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
1,380 1,478 (12) 2,846 0 0 2,846 2,846 - 195
Enterprise &  
Sustainable Dev
18,460 4,769 5,329 28,558 7,408 0 35,966 35,966 - 1.304
Roads, Transport
& Fleet
11,798 4,995 2,377 19,170 4,190 0 23,360 23,360 - 1,879
Resource 
Total 31,638 11,242 7,694 50,574 11,598 0 62,172 62,172  - 3,378           
Education
Growth /
Accommodation
Pressures
5,531 (2,084) 2,316 5,763 773 0 6,536 6.536 - 1,779
ICT
Developments
1,600     38 - 1,638 0 0 1,638 1,638 - 520
Free School
Meals
0 308 (78) 230 0 0 230 230 - 95
Education Other 0 480 123 603 35 0 638 638 - 239
Resource 
Total 7,131 (1,258) 2,361 8,234 808 0 9,042 9,042  - 2,633           
Finance & Corporate
IT Services 2,246 684 156 3,086 0 0 3,086 3,086 - 866
Resource 
Total 2,246 684 156 3,086 0 0 3,086 3,086  - 866           
Office Accom 5,852 3,742 (919) 8,675 0 0 8,675 8,675 - 408
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 0 0 1,000 1,000 - 0
Other Housing 304 29 921 1,254 700 0 1,954 1,954 - 15
Resource 
Total 7,156 3,771 2 10,929 700 0 11,629 11,629  - 423  
Social Work
Alarms / SWIS
Plus
1,341 (318) 4 1,027 0 0 1,027 1,027 - 142
Resource Total 1,341 (318) 4 1,027 0 0 1,027 1,027  - 142           
Overall Total 49,512 14,121 10,217 73,850 13,106 0 86,956 86,956  - 7,442 
16

Page 17

APPENDIX D 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 12 JULY 2024 
2024/25
Original
Estimate
inc C/F 
2024/25
Revised
Budget 
2024/25
Forecast
Spend 
2024/25
Forecast
Variance 
2024/25
Actual to
12/07/24      
Expenditure £m £m £m £m £m      
General Fund Programme 73.850 86.956 86.956 - 7.442       
Income
2024/25
Budget
2024/25
Revised
Budget  
2024/25
Actual
To
12/07/24         
£m         £m   £m
Prudential Borrowing 32.564 34.364   34.364
Developers Contributions 8.800 8.835   0.000
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund,
Cycling Scotland, Transport Scotland
and REF / Wind Farms) 
0.958 2.942   0.446
Scottish Government:     
- Capital Grant 20.156 22.278   5.039 
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant) 
- Road Safety Improvement
1.440 
0.000
0.000 
0.497  
0.000 
0.440 
- Vacant and Derelict Land 1.793 1.793   1.368 
- Regeneration Capital Grant  2.170 2.170   0.993 
- Place Based Investment
Programme
0.727 0.727   0.727
Shared Prosperity Fund 2.645 2.653   0.000
Levelling Up Fund 0.000 7.400   0.000
Capital Receipts 1.340 1.340   2.251
Specific Reserves 1.257 1.957   1.957
Revenue Contribution 0.000 0.000   0.000      
TOTAL FUNDING 73.850 86.956   47.585 
17

Page 18

Appendix E
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2024/25 
BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 12 JULY 2024 (PERIOD 4)
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status               
Projects Complete  - 1 1 6 - - - - - - - - - -
Projects on Programme  - 85 92 102 - - - - - - - - - -
Projects Behind
Programme 
- 0 0 0 - - - - - - - - - -
Projects Altered Brief/
Programme 
- 2 2 2 - - - - - - - - - -
Projects Held  - 15 14 23 - - - - - - - - - - 
- 103 109 133 0 0 0 0 0 0 0 0 0 0               
Project Status               
Design Feasibility  - 43 49 73 - - - - - - - - - -
Sketch Design  - 1 1 1 - - - - - - - - - -
Detailed Design  - 0 0 0 - - - - - - - - - -
Production Information  - 9 9 8 - - - - - - - - - -
Tendering  - 24 24 25 - - - - - - - - - -
On Site  - 25 25 20 - - - - - - - - - -
Complete  - 1 1 6 - - - - - - - - - - 
- 103 109 133 0 0 0 0 0 0 0 0 0 0 
18

Page 19

Appendix E
(Page 2)
General Services Capital Programme 2024/25 
Build Variance Explanations 
Project Name Status Variance Explanation
- - - 
19

Page 20

Appendix F
(Page 1) 
GENERAL FUND CAPITAL PROGRAMME 2024/25                     
NON BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 12 JULY 2024 (PERIOD 4) 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Number of Projects           
Carried Forward 23/24
Programme - - 31 31                         
Approved from 24/25
Programme - - 5 5                         
Total Projects Currently
Reported - - 36 36                         
Number of Projects                           
Projects Completed - - 2 2                         
Projects Ahead of
Programme - - 0 0                         
Projects on Programme - - 34 34                         
Projects Behind
Programme - - 0 0         
Projects, Altered
Brief/Programme - - 0 0                         
Projects On Hold  - - 0 0                         
- - 36 36           
20

Page 21

Appendix F
(Page 2)
General Services Capital Programme 2024/25
Non-Build Executive Summary – Project Status 
Project Status
SLLC - Booking and Admission System On programme
Philipshill Cemetery - Extension  On programme
Ash Die Back On programme
Langlands Boardwalk On programme
Bin Storage Areas On programme
Nature Restoration Fund On programme
Renewal of Play Parks On programme
Greenhall Replacement Bridge On programme
White Bridge Replacement, Chatelherault Country Park (cost design) On programme
Alexander Hamilton Memorial Fountain - Stonehouse Park On programme
Douglas Primary School - Floodlights Complete
Calderglen Country Park - One Way System & Infrastructure On programme
Three Rivers / Clydesdale Way On programme
East Kilbride Town Centre Masterplan On programme
Rural Development Centre - Lanark  On programme
SLC Industrial Infrastructure - Energy Efficiency  On programme
Carnwath Community and Business Enterprise HUB On programme
Carluke High Mill Community Facility On programme
Shawfield Remediation and Development On programme
Kirktonholme Pitches On programme
Biggar Youth Project On programme
Cambuslang Streetscape - Phase 2 Complete
Coalyard Housing On programme
New Cross Shopping Centre On programme
Vacant & Derelict Land On programme
Schools ICT On programme
IT Infrastructure Refresh On programme
Oracle Upgrade On programme
Digital Transformation Review Fund On programme
Public Switch Telephone Network / Alarms (Analogue to Digital) On programme
Lock Up Areas  On programme
Gypsy Travellers Sites On programme
Private Housing Scheme of Assistance (PHSA) On programme
Central Energy Efficiency Fund  On programme
Community Alarms On programme
Replacement SWISS Plus IT System On programme 
21

Page 22

Appendix G
(Page 1) 
GENERAL SERVICES CAPITAL PROGRAMME 2024/25 
ROADS EXECUTIVE SUMMARY 
PERIOD ENDED 12 JULY 2024 (PERIOD 4)                             
1 2 3 4 5 6 7 8 9 10 11 12 13              
Number of Projects             
Total Projects Currently Reported - - 166 172         
Programme Status             
Projects Complete - - 31 39         
Projects on Programme - - 135 133         
Projects Behind Programme - - 0 0         
Projects, Altered Brief / Programme - - 0 0         
Projects Still to Commence - - 0 0         
- - 166 172         
Project Status             
Briefing - - 32 28         
Production Information - - 82 77         
Billing - - 0 0         
Tendering - - 3 3         
On Site - - 18 25         
Complete - - 31 39         
- - 166 172         
22

Page 23

Appendix G
(Page 2) 
General Services Capital Programme 2024/2025 
Roads Variance Explanations 
Project Name Status Variance Explanation
- - - 
23

Page 24

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Marchmont Gardens/Failford Road, Strathaven 1 1
Hawthorn Terrace, East Kilbride 1 1
Mount Cameron Drive South and Easdale, East Kilbride 1 1
Stewartfield  Crescent, East Kilbride 1 1
A749 Glasgow Road , East Kilbride (Kingsgate) 1 1
Telford Road, East Kilbride 1 1
Livingstone Drive, East Kilbride 1 1
Troon Avenue, East Kilbride 1 1
Angus Place and Semphill Gardens, East Kilbride 1 1
Stobo, East Kilbride 1 1
Kype Highway / High Kype Road, Strathaven 1 1
Loch Assynt, East Kilbride 1 1
Glasgow Road Service Road, Rutherglen 1 1
Village Road, Cambuslang 1 1
Langlea Road, Rutherglen 1 1
Wellshot Drive, Cambuslang 1 1
Surface Dressing/Preventative Maintenance Schemes
Ardochrig Highway, Auldhouse 1 1
Bents Road, Chapelton 1 1
Burn Highway, Chapelton 1 1
Cairnmuir Road, East Kilbride 1 1
Hairshaw Highway, Strathaven 1 1
Waterhead Peelhill Highway between A71 & B743 1 1
Waterhead Peelhill Highway between A71 & B744 1 1
Preparatory works 24/25 (Patching and drainage) 1 1
Preventative maintemance (Rhinophalt / prep patching) 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title
24

Page 25

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching
Newton Station Road, Halfway 1 1
Glen More EK North 1 1
Tewkesbury Road EK 1 1
Buchandyke Road EK 1 1
Capel Grove, EK 1 1
Parking Area Shaftsbury Court EK 1 1
Rockhampton Avenue EK 1 1
Inglis Place, EK  1 1
Craigend Road. 1 1
Castleview Road, Strathaven 1 1
WP Highway, Gilmourton 1 1
St Annes Well, Strathaven 1 1
Crutherland Highway 1 1
Millwell Road, Auldhouse 1 1
Churchill Avenue, EK 1 1
Kirktonholme Road, EK 1 1
Kirktonholme Road, EK 1 1
Quarry Road at Stroud Road 1 1
Stroud Road near column R59 1 1
Eaglesham Road at train station 1 1
Eaglesham Road RAB with Peel Road 1 1
Shawfield Drive, Rutherglen 1 1
Footways
Stewartfield Crescent, East Kilbride 1 1
Kirk Street, Strathaven 1 1
Caribou Green, Three Rivers Walk, East Kilbride (Slabs to asphalt) 1 1
Dovecastle Drive, Strathaven 1 1
Machline, East Kilbride (Slabs to asphalt) 1 1
Steps at railway solum - East Mains Road, Rosslyn Ave and Glamis Drive 1 1
Cathcart Road, Rutherglen 1 1
Curtis Avenue, Rutherglen 1 1
Stonelaw Road, Rutherglen 1 1
Hamilton Area
Strategic Schemes 
Muttonhole Road (Phase 2) 1 1
Lanark Road, Rosebank, Larkhall 1 1
Drygate Street, Larkhall 1 1
A72, Lanark Road, Highlees, Larkhall 1 1
Campbell Street, Hamilton 1 1
25

Page 26

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Infrastructure  (Drainage Schemes)
Summerlee Road, Larkhall 1 1
Green Street, Stonehouse 1 1
Meikle Earnock Road, Hamilton 1 1
Preventative Maintenance Schemes
Palace Grounds Road, Hamilton (*TRIAL*) 1 1
Auchentibber Road, Blantyre 1 1
Sandford Road (Phase 1), Stonehouse 1 1
Boghead Highway, Hamilton 1 1
2025/26 Schemes - Preparatory Patching 1 1
Strategic Patching
Swisscott Avenue, Hamilton 1 1
Wellcroft Road, Hamilton  1 1
A72, Lanark Road, Dalserf 1 1
Burnhouse Road, Hamilton 1 1
Woodlands Avenue, Bothwell 1 1
Morven Avenue, Blantyre 1 1
Palace Grounds Road, Hamilton 1 1
Caird Street, Hamilton 1 1
Townhead Street, Hamilton 1 1
Millheugh Brae, Larkhall 1 1
Candermill and Marlage Road, Larkhall 1 1
Glenburn Avenue, Stonehouse 1 1
Third Road, Blantyre 1 1
Bothwell Road, Uddingston 1 1
Parkneuk Road, Blantyre 1 1
Newhousemill Road, Hamilton 1 1
Muttonhole Road / Highstonehall Road 1 1
Muir Street, Hamilton 1 1
Grier Place, Larkhall 1 1
26

Page 27

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Footways
Nairn Avenue, Blantyre 1 1
Station Road, Blantyre 1 1
Chestnut Grove, Blantyre 1 1
Craigmuir Road, Blantyre 1 1
Anderson Street / Stewart Street, Hamilton 1 1
Darngaber Gardens, Quarter 1 1
Castle Avenue, Bothwell (Phase 1) 1 1
Castle Avenue, Bothwell (Phase 2) 1 1
Haddow Street, Hamilton 1 1
Woodside Walk, Hamilton 1 1
Lowther Crescent, Stonehouse  1 1
Limekilnburn Road, Quarter 1 1
Clydesdale Area
Strategic Schemes 
A706 Harelaw Roundabout 1 1
A73 Lanark Road, Carluke 1 1
A72 Lanark Road, Crossford 1 1
B715 Climpy Road. Forth 1 1
B7016 Forth to Braehead 1 1
A70 Hazelside to Glespin 1 1
Glenafeoch Road, Carluke 1 1
C4 from Kilncadzow to Lanark (Cartland) 1 1
C37 Harelaw 1 1
B797 Leadhills 1 1
B7018 Lesmahagow Road, Kirkfieldbank 1 1
Roman Court, Cleghorn 1 1
B7078 Carlisle Road, Lesmahagow 1 1
Smyllum Road, Lanark 1 1
Jerviswood Road/North Vennel, Lanark 1 1
Orchard Street/Mill Road, Carluke (Sheltered Complex) 1 1
B7016 Libberton to Brownhill Farm 1 1
C1 Mauldslie Road 1 1
Luggie Road/Weighouse Road, Carluke 1 1
B7078 Carlisle Road, Blackwood 1 1
A70 Pretsmill 1 1
The Cut, Lesmahagow 1 1
Gallowhill Road, Lanark 1 1
Boghall Road, Carluke 1 1
Strategic Infrastructure  (Drainage Schemes)
C4 Moor Road, Carland 1 1
A73 Hyndford Rd - Turning of the staff/Sensory Gardendford Road 1 127

Page 28

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Preventative Maintenance Schemes
B797 New Glendorch, Leadhills 1 1
B797Broadlaw Kennels, Leadhills 1 1
Mill Road, Dolphinton 1 1
Libberton Muir Road 1 1
Greenshields Road, Biggar 1 1
Hillhead Road, Covington 1 1
A73 Meadowfoot Road, Covington 1 1
A70 Redford Bridge 1 1
Strategic Patching
Strategic/Machine Patching, Classified Road mainly 1 1
Footways
Roman Court, Cleghorn 1 1
Forrest Road, Lanark 1 1
B7078 Milton 1 1
Violewt Bank 1 1
PARTICIPATORY BUDGET
Clydesdale Area
Footways
St Leonard Steet, Lanark 1 1
ROADS REFURBISHMENT BUDGET
Structures projects
East Kilbride line electrification – Maintenance/refurb of four SLC structures 1 1
Duke Street MSCP – Next phase (3) of the structural appraisal 1 1
Burnhouse Bridge by Auldhouse – refurbishment and repair 1 1
Cornwall Street Footbridge, East Kilbride – assessment of half joints 1 1
Priestburn Bridge – refurbishment and repair 1 1
Elvanfoot Bridge – bridge refurb & installation of high containment kerbing 1 1
Traffic and Transportaion
Minor works ~ various lining & signing works 1 1
Vehicle Actived Signs ~ Upgrades 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure 1 1
BRIDGES
Clyde Bridge ~ Replacement of existing structure 1 1
28

Page 29

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 4
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
20mph/30mph ROAD AND PLACE CRITERIA ASSESSMENT
Road assessments for speed limits in appropriate areas 1 1
CYCLING SCOTLAND
Cycle shelters at schools 1 1
SCOTTISH GOVERNMENT TIER 1 FUNDING (FOPRMERLY CWSR)
Active Travel routes at schools
Pedestrians and cyclists facilities as part of Hairmyres Station project. 1 1
Pedestrian and cycle improvements
Ph.2 ~ Burnbank Road near West Stewart Street 1 1
Toucan Crossing Installations
Eaglesham Road east of Redwood Drive 1 1
Eaglesham Road west of Redwood Drive 1 1
Redwood Drive 1 1
Greenhills Road 1 1
LOCAL AUTHORITY DIRECT AWARD
High Common Road ped crossing upgrade 1 1
Main Street/Nairn St. Blantyre ped crossing upgrade 1 1
Main Street/Broompark, ped crossing upgrade 1 1
Cadzow Sreet ped crossing upgrade (toucan) 1 1
Portlend Square, ped crossing upgrade 1 1
Cycle counter upgrades 1 1
ROAD SAFETY IMPROVEMENT FUND
A70,  from A73 Hyndford Rd to A743 Ravenstruther 1 1
A726, from Torrance Roundabout to Strathaven 1 1
A706, Forth to council boundary 1 1
Hillhouse Road/ Technology Avenue, Hamilton 1 1
A71 Ayr Road nr. Burnhead Road, Shawsburn 1 1
CITY DEAL PROJECTS
Cathkin ~ Loss of value and Noise Insulation Regulations surveys 1 1
Stewartfield Way 1 1
Greenhills/Strathaven Road 1 1
28 77 0 3 25 39 39 133 0 0 0
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 September 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2024/2025 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April 2024 to 12 July
2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 12 July 2024 from both
a financial and physical perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B. 
4. 2024/25 Housing Capital Programme 
4.1. 2024/25 Budget:  The revised Housing Capital Programme for the year is £77.248 million
reflecting changes to the programme approved by the Executive Committee on 26 June
2024. 
4.2. Programmed funding for the year also totals £77.248 million.  The budget, along with a
detailed breakdown of the funding sources is included in Appendix A to this report.   
4.3. 2024/2025 Forecast:  The predicted spend position for the Housing Programme for this
financial year is £77.248 million.   
4.4. As at 12 July 2024, £11.647 million of funding had been received. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications 
6.1. The financial implications are detailed in section 4 of this report. 
3b
31

Page 32

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 August 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 4 September 2024 
List of Background Papers 
 Capital Ledger prints to 12 July 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
32

Page 33

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2024/25
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 12 JULY 2024 
2024/25
Annual
Budget 
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25
Actual to
12/07/24 
£m £m £m £m
Expenditure 
2024/25 Budget  77.248  77.248  -  11.647     
2024/25
Annual
Budget  
2024/25
Actual to
12/07/24 
£m   £m
Income         
Capital Receipts 0.000   0.265
Capital Receipts – Land Sales 0.000   0.000
Capital Funded from Current Revenue 33.506   9.955
Prudential Borrowing 23.677   0.000
Scottish Government Specific Grant:    
- New Build 16.945   1.209
- Open Market Purchase Scheme 3.000   0.000
- Mortgage to Rent 0.120   0.036
Other Income 0.000   0.182 
77.248   11.647 
33

Page 34

Appendix B
(Page 1)
HOUSING CAPITAL PROGRAMME 2024/2025
EXECUTIVE SUMMARY
PERIOD ENDED 12 JULY 2024
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Programme Status               
Projects Complete  - 5 5 15 - - -- - - - - - - -               
Projects on Programme - 112 112 105 - - - - - - - - - -               
Projects Behind
Programme 
- 8 5 3 - - - - - - - - - -               
Projects Altered
Brief/Programme
- 2 6 5 - - - - - - - - - -               
Projects Held  - 21 22 24 - - - - - - - - - - 
- 148 150 152 0 0 0 0 0 0 0 0 0 0               
Project Status              
Design Feasibility  - 58 59 55 - - - - - - - - - -               
Sketch Design  - 4 4 2 - - - - - - - - - -               
Detailed Design  - 2 2 2 - - - - - - - - - -               
Production Information - 9 9 13 - - - - - - - - - -               
Tendering - 45 45 42 - - - - - - - - - -               
On Site  - 25 26 23 - - - - - - - - - -               
Complete - 5 5 15 - - - - - - - - - -               
- 148 150 152 0 0 0 0 0 0 0 0 0 0 
34

Page 35

Appendix B
(Page 2) 
Housing Capital Programme 2024/2025 
Build Variance Explanations 
Project Name Status Variance Explanation   
Donaldson Street, Hamilton -
Environmental Upgrade 
Behind Programme  This project is behind
programme due to a
delay in raising orders to
sub-contractors which has
now been resolved. 
Camnethan Street PH1,
Stonehouse - Environmental
Upgrade 
Behind Programme This project is behind
programme due to a
delay in raising orders to
sub-contractors which has
now been resolved. 
Kirkriggs Gardens Sheltered
Housing - Landscaping 
Behind Programme This project is behind
programme due to 
resources late on site and tar
path to be re-done. 
35

Page 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 24/25 0 5.05 10.075 11.562 17.583 23.604 29.625 35.646 41.667 47.688 53.709 59.73 65.751 77.302
Revised Budget 24/25 0 5.05 10.075 11.647 17.753 23.859 29.965 36.071 42.177 48.283 54.389 60.495 66.601 77.248
Actual 24/25 0 5.05 10.075 11.647 0 0 0 0 0 0 0 0 0 0
0
10
20
30
40
50
60
70
80
90
£ Millions
HRA Capital Expenditure Profile Graph 24/25
36

Page 37

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 September 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Forum of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2024 to 12 July 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2024/2025, and the actual spend as at 12 July 2024 (section 4 and Appendix
1), be noted; 
(2) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 12 July 2024 (section 5 and Appendix 2
of the report), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2024/2025 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section 5). 
It will also provide the actual spend as at 12 July 2024. 
4. General Services 2024/2025 Projected Outturn as at 12 July 2024
4.1. As at 12 July 2024, the projected outturn position for 2024/2025 on the General
Services budget is break-even (Appendix 1).   
4.2. Section 4.3 onwards provides detail on a number of key budget areas.   
4.3. Teacher Numbers:  As previously reported, in relation to 2024/2025, the Council
has now received notification that the allocation of funding for teacher numbers of
£145.5 million for 2024/2025 will be distributed via Specific Resource Grants, and
those grants will be conditional on councils agreeing at the outset to maintain teacher
numbers. Our share of the £145.5 million funding is £9.379 million. Scottish
Government have indicated that they will consider mitigations presented by councils
for reducing teachers but that we will not know if mitigations will be acceptable until
much later in the year.   
4.4. The Scottish Government have responded to communication from Council officers
continuing to reiterate that any mitigations would be considered on a case-by-case
basis, but they will not be in a position to agree any mitigations in advance of the
4
37

Page 38

teacher number census publication (December 2024). Officers have requested a
meeting with the Scottish Government to discuss the matter. 
4.5. COSLA Leaders discussions have concluded at this stage that councils should not
sign the grant letter, and that further engagement with the Scottish Government is
being pursued. 
4.6. Employers Pension Contribution Increase (Teachers):  As advised previously, on
1 April 2024, the Council’s pension contribution for Teachers’ Pensions was
increased from 23% to 26% of basic pay. The cost to the Council is an estimated
£5.5 million however, the Council has not yet been notified of funding to support this
increase. That said, the Scottish Government expect to receive funding for this from
the UK Government and have committed to passing this on to councils.   
4.7. Loans Fund Review:  One of the Cross-Cutting Reviews reported to Members in
the 2025/2026 to 2027/2028 Revenue Budget Strategy report (Executive Committee
in June 2024) was in relation to Loan Charges / Service Concession
arrangements. Any impact on the current year outturn position will be reported later
in the year. 
5. Housing Revenue Account Position
5.1. As at 12 July 2024, Appendix 2 of the report shows a break-even position on the
Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources. The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in this
report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
38

Page 39

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 August 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 12 July 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
39

Page 40

Note:  While the Year to Date Actual at period 4 presents a net surplus position (£39.131m), this is timing only. The forecast outturn
shows break-even for the year. 
Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 124.593 124.593 0.000 0.00% 27.632
Facilities Waste and Grounds 76.027 75.833 0.194 0.26% 21.038
Leisure and Culture 4.659 4.614 0.045 0.97% 1.088
Planning and Regulatory Services 21.738 21.738 0.000 0.00% 4.813
Enterprise and Sustainable Development 5.583 5.573 0.010 0.18% (0.465)
Roads, Transportation and Fleet 16.586 16.835 (0.249) (1.50%) 1.158
Education Resources 456.765 456.765 0.000 0.00% 121.881
Education 456.765 456.765 0.000 0.00% 121.881
Finance and Corporate Resources 38.512 38.512 0.000 0.00% 15.915
Finance Services - Strategy 1.851 1.851 0.000 0.00% 0.925
Finance Services - Transactions 16.775 16.775 0.000 0.00% 6.405
Audit and Compliance Services 0.318 0.318 0.000 0.00% 0.142
Information Technology Services 6.852 6.852 0.000 0.00% 4.501
Communications and Strategy Services 2.372 2.372 0.000 0.00% 0.675
Administration and Licensing Services 4.048 4.048 0.000 0.00% 1.350
Personnel Services 6.296 6.296 0.000 0.00% 1.917
Housing & Technical Resources 13.541 13.541 0.000 0.00% 13.568
Housing Services 8.767 8.718 0.049 0.56% 1.020
Property Services 4.774 4.823 (0.049) (1.03%) 12.548
Social Work Resources 233.995 233.995 0.000 0.00% 60.356
Performance and Support Services 5.800 5.738 0.062 1.07% 1.261
Children and Families 46.985 47.358 (0.373) (0.79%) 12.415
Adults and Older People 180.475 180.475 0.000 0.00% 46.599
Justice and Substance Misuse 0.735 0.424 0.311 42.31% 0.081
Joint Boards 1.902 1.902 0.000 0.00% 0.439
869.308 869.308 0.000 0.00% 239.791
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 869.308 869.308 0.000 0.00% 239.791
CFCR 0.000 0.000 0.000 0.00% 0.000
Loan Charges 39.589 39.589 0.000 0.00% 0.000
Corporate Items 16.045 16.045 0.000 0.00% 0.585
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Total Expenditure 948.232 948.232 0.000 0.00% 240.376
Council Tax 181.587 181.587 0.000 0.00% 55.873
Less: Council Tax Reduction Scheme (23.544) (23.544) 0.000 0.00% (7.244)
158.043 158.043 0.000 0.00% 48.629
General Revenue Grant 385.450 385.450 0.000 0.00% 118.600
Non Domestic Rates 364.911 364.911 0.000 0.00% 112.280
Transfer from Reserves 39.828 39.828 0.000 0.00% 0.000
Total Income 948.232 948.232 0.000 0.00% 279.509
Net Expenditure 0.000 0.000 0.000 0.00% (39.133)
Period Ended 12 July  2024 (No.4)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
40

Page 41

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 13.782 13.782 0.000 0.00% 3.662
Property Costs 59.203 59.203 0.000 0.00% 9.654
Supplies and Services 1.543 1.543 0.000 0.00% 0.184
Transport and Plant 0.195 0.195 0.000 0.00% 0.020
Administration 5.594 5.594 0.000 0.00% 0.110
Payment to Other Bodies 2.975 2.975 0.000 0.00% 0.713
Payment to Contractors 0.100 0.100 0.000 0.00% 0.185
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 33.573 33.573 0.000 0.00% 10.312
Total Controllable Exp. 116.965 116.965 0.000 0.00% 24.840
Total Controllable Inc. (123.398) (123.398) 0.000 0.00% (28.141)
Transfer to/(from) Balance Sheet (4.229) (4.229) 0.000 0.00% 0.000
Net Controllable Exp. (10.662) (10.662) 0.000 0.00% (3.301)
Loan Charges 10.662 10.662 0.000 0.00% 3.301
Net Controllable Exp. 0.000 0.000 0.000 0.00% 0.000
Variance Explanations
No variances to note.
Virements
None.
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 12 July  2024 (No.4)
Housing Revenue Account
41

Page 42

42

Page 43

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 September 2024
Report by: Executive Director (Finance and Corporate Resources)
Subject: Revenue Budget 2024/2025 - Detailed Resource
Analysis
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2024/2025.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):
[recs]
(1) that the 2024/2025 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted.
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 12 July 2024. The detailed papers cover the
General Services and also the Housing Revenue Account.
3.2. The following information is provided for each Resource and the Housing Revenue
Account:
 An Executive Summary showing the top-level position.
 Details of the most significant variances across Subjective headings and across
Services.
 A line-by-line trend analysis of the total Resource expenditure and income across
Subjective headings.
3.3. These are shown in appendices A to F attached.
4. Employee Implications
4.1. None
5. Financial Implications
5.1. As detailed in each of the individual Resource papers.
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report.
5
43

Page 44

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources. The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 August 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Revenue Ledger prints to 12 July 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk 
44

Page 45

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 12 July 2024 (No 4)
Community and Enterprise Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Facilities, Waste and Grounds 76.027 75.833 0.194 0.26% 21.038
Leisure and Culture 4.659 4.614 0.045 0.97% 1.088
Planning and Regulatory Services 21.738 21.738 0.000 0.00% 4.813
Environmental and Sustainable Devlopment 5.583 5.573 0.010 0.18% (0.465)
Roads, Transportation and Fleet 16.586 16.835 (0.249) -1.50% 1.158
Total Community and Enterprise Resources 124.593 124.593 0.000 0.00% 27.632
5
45

Page 46

Community and Enterprise Resources Variance Analysis 2024/25 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,194k
under
APT&C Basic/Superannuation/NI –
1,195k under 
Facilities, Waste and
Grounds Services -
244k under 
The projected variance is
mainly due to vacant posts
across the services. 
Recruitment is currently being
progressed. 
Planning and
Regulatory Services -
71k under 
Enterprise and
Sustainable
Development - 23k
under 
Roads, Transportation
and Fleet Services -
856k under 
The variances are mainly due to
vacant posts, with recruitment
currently being progressed. The
remaining projected
underspends within Road’s
staffing could possibly lead to
reduced recharges to the
Roads Client account and
possible increase in costs on
sub-contractors. 
46

Page 47

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (80k) over Water Metered charges - (11k) over Roads, Transportation
and Fleet Services -
(11k) over 
The level of Water charges to
supply the depots within Roads
Contracting is higher than the
budget set. 
Repairs & Maintenance - Internal -
(11k) over
Roads, Transportation
and Fleet Services -
(11k) over 
The projected overspend mainly
relates to the upkeep of the
Road’s construction depots.  
Electricity Contract - (14k) over Roads, Transportation
and Fleet Services -
(15k) over 
This projected overspend
mainly relates to higher than
budgeted electricity expenditure
on the charging of electrical
vehicles. 
Cleaning & Janitorial Supplies - (46k) 
over
Facilities, Waste and
Grounds Services -
(40k) over
This projected overspend
relates to an increase in costs
for cleaning materials.
Supplies and
Services
(224k) over Computer Equipment Purchase -
(133k) over
Planning and
Regulatory Services -
(30k) over 
This projected overspend
mainly relates to the greater
than budgeted costs of the IT
system upgrade for IDOX within
Planning & Building Standards. 
Enterprise and
Sustainable
Development - (15k)
over
This projected overspend is
within Support and relates to IT
Leasing costs, being greater
than budget.
47

Page 48

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.)  
Roads, Transportation
and Fleet Services -
(88k) over 
This projected overspend
mainly relates to increased
costs for annual subscriptions
for computer licences within
Roads.   
IT Equipment Maintenance – (20k)
over 
Enterprise and
Sustainable
Development – (16k)
over 
This projected overspend is
within Support and relates to IT
leasing costs for the cashless
school meal system. 
Materials – (56k) over  Facilities, Waste and
Grounds Services –
(62k) over 
This projected overspend
mainly relates to an increased
level of spend on replacement
domestic waste bins within
Grounds and Streets. 
Protective Clothing & Uniforms – (9k)
over
Facilities, Waste and
Grounds Services –
(9k) over 
The projected overspend
relates to the requirement for
new PPE for operatives within
Streets.
Transport and
Plant
(302k) over Fleet Service Charges - Vehicle
Maintenance - (153k) over
Facilities, Waste and
Grounds Services -
(105k) over 
Roads, Transportation
and Fleet - (45k) over 
This projected overspend is due
to higher than anticipated
charges for routine
maintenance within Waste,
Streets and Grounds. 
The projected overspend is due
to higher than anticipated
charges for routine
maintenance. 
48

Page 49

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.) 
Fleet Service Charges - Plant
Maintenance - 34k under 
Fleet Service Charges - Leasing -
(125k) over 
Fleet Service Charges - Hires - (110k)
over
Roads, Transportation
and Fleet - 34k under 
Roads, Transportation
and Fleet - (142k) over 
Facilities, Waste and
Grounds Services - 24k
under 
Facilities, Waste and
Grounds Services - 15k
under 
Roads, Transportation
and Fleet - (125k) over
This projected underspend is
mainly due to lower than
anticipated costs associated
with the upkeep of Winter plant
within Roads. 
This projected overspend
mainly relates to increased
annual charges as a result of
the purchase price of new
vehicles.   
This projected underspend is
due to a reduction in the
number of leased vehicles
required within the Streets
service. 
This projected underspend is
within Grounds services and
reflects a reduction in the use of
hired vehicles. 
This projected overspend
mainly relates to the higher than
budgeted costs for Winter plant
hire.
49

Page 50

Subjective Head Variance  Subjective line Service / amount Explanation
Income  564k under
recovered
Fees and Charges - General - (569k)
under recovered 
Fees and Charges - Department of
the Authority - 166k over recovered 
Trading Services Recharges - (175k)
under recovered 
Facilities, Waste and
Grounds Services –
(49k) under recovered 
Roads, Transportation
and Fleet - (497k)
under recovered 
Facilities, Waste and
Grounds Services -
166k over recovered 
Roads, Transportation
and Fleet - (175k)
under recovered
The projected under recovery is
due to lower than budgeted
income from care of gardens
within Grounds services. 
The projected under recovery is
within Parking where the
demand is less than
anticipated. 
This projected over recovery is
mainly due to an increase in
additional service requests in
Waste Services from Housing
and Technical Resources for
additional bin uplifts. 
The projected under recovery is
due to the level of vacancies in
the service (above) resulting in
lower than budgeted recharges.
This under recovery is offset in
an underspend in employee
costs. 
* The underlined variances represent new variances since the last report.
50

Page 51

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Community & Enterprise Resources Summary Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 78,154 632 80,812 19,747 80,376 436
APT & C OVERTIME 1,631 (1) 1,630 550 1,593 37
APT & C SUPERANNUATION 4,422 857 5,420 1,200 4,618 802
APT & C NIC 6,645 (299) 6,584 1,675 6,664 (80)
TRAVEL AND SUBSISTENCE 23 0 23 1 24 (1)
OTHER EMPLOYEE COSTS 229 0 229 (34) 229 0
PENSION INCREASES 772 0 772 145 772 0
EMPLOYEE COSTS 91,876 1,189 95,470 23,284 94,276 1,194
PROPERTY COSTS
RATES 1,005 0 1,006 0 1,007 (1)
SCOTTISH WATER - UNMETERED CHARGES 325 0 325 3 325 0
SCOTTISH WATER - METERED CHARGES 166 (11) 155 28 166 (11)
RENT 196 1 197 29 196 1
SERVICE CHARGE 42 0 42 1 42 0
FACTORING CHARGES 16 0 16 14 16 0
PROPERTY INSURANCE 288 0 288 0 288 0
SECURITY COSTS 39 5 44 17 39 5
GROUND MAINTENANCE 8 0 8 0 8 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 0 1 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 20 (10) 10 7 21 (11)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS DIRECT CHARGE 0 0 0 0 0 0
LIFE CYCLE MAINTENANCE 10 (10) 0 2 10 (10)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 24 7 30 41 23 7
SOLID FUEL HEATING MAINTENANCE 0 0 0 2 0 0
ASBESTOS 0 0 0 1 0 0
FIXED ELECTRICAL 0 0 0 6 0 0
ELECTRICITY - CONTRACT 5,804 (15) 5,789 993 5,803 (14)
GAS 865 0 865 340 865 0
SOLID FUEL 14 0 14 0 14 0
JANITORIAL SUPPLIES 1 0 1 0 1 0
CLEANING CONTRACT 20 0 20 15 20 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 474 (46) 429 162 475 (46)
HEALTH & HYGIENE MATERIALS 25 0 25 (11) 25 0
REFUSE UPLIFT 404 0 404 144 404 0
OTHER PROPERTY COSTS 27 0 27 0 27 0
PROPERTY COSTS 9,773 (79) 9,695 1,795 9,775 (80)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 721 (133) 552 302 685 (133)
COMPUTER EQUIPMENT MAINTENANCE 79 0 46 4 46 0
I.T. EQUIPMENT MAINT-CONTRACT 322 (16) 200 2 220 (20)
I.T. ELECTRONIC MESSAGING 74 0 3 0 3 0
EQUIPMENT, APPARATUS AND TOOLS 878 0 878 151 877 1
SMALL TOOLS 107 0 107 0 107 0
FURNITURE - OFFICE 0 0 0 2 0 0
FURNITURE - GENERAL 3 0 3 0 3 0
FURNISHINGS (INCL. CROCKERY & LINEN) 110 0 110 3 110 0
MATERIALS 7,310 (68) 7,242 1,028 7,298 (56)
STOCK/STORE ISSUES 0 0 0 267 0 0
MATERIALS, APPARATUS AND EQUIPMENT 9 0 9 5 9 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 24 2 0
FOODSTUFFS - GENERAL 5,001 0 4,998 1,605 4,998 0
PROTECTIVE CLOTHING & UNIFORMS 213 (5) 207 92 216 (9)
LAUNDRY COSTS 10 0 10 4 10 0
OTHER SUPPLIES AND SERVICES 1,453 (3) 1,453 39 1,460 (7)
CATERING - EXTERNAL 0 0 0 2 0 0
MAJOR SUPPLY OF ELECTRICAL POWER 2,498 0 2,498 (240) 2,498 0
OUTSOURCED MAIL 0 0 0 5 0 0
DELIVERY CHARGE 1 0 1 0 1 0
SUPPLIES AND SERVICES 18,791 (225) 18,319 3,295 18,543 (224)
51

Page 52

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Community & Enterprise Resources Summary Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 (4,203) 0 0
PURCHASE OF PLANT 41 22 63 3 41 22
FLEET SERVICES - DRIVERS 68 (7) 61 0 68 (7)
FLEET SERVICES - FUEL 2,998 0 2,998 1,255 2,997 1
FLEET SERVICES - VEHICLE HIRE 1,729 (500) 1,729 266 1,729 0
POOL CAR CHARGES - RENTAL 75 (11) 64 23 75 (11)
POOL CAR CHARGES - FUEL 18 4 22 0 18 4
POOL CAR CHARGES - ADDITIONAL COSTS 5 2 7 0 5 2
TYRES 0 0 0 1 0 0
OTHER TRANSPORT COSTS 71 7 78 31 71 7
TRANSPORT INSURANCE 93 0 92 0 92 0
LICENCES 491 0 491 119 491 0
FLEET SERVICES - REPAIRS 1,917 0 1,917 835 1,917 0
PLANT SERVICES 19 0 19 1 19 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,453 (156) 4,296 1,312 4,449 (153)
FLEET SERVICE CHARGES - PLANT MAINTENANCE 235 34 269 70 235 34
FLEET SERVICE CHARGES - ASSET MODIFICATION 61 10 71 3 61 10
FLEET SERVICE CHARGES - LEASING 5,192 (128) 5,065 2,339 5,190 (125)
FLEET SERVICE CHARGES - HIRED VEHICLES 1,205 (108) 1,097 237 1,207 (110)
FLEET SERVICE CHARGES - CONTRACT HIRE 12 0 12 0 12 0
FLEET SERVICE CHARGES - ROAD FUND LICENCE 210 8 218 53 210 8
FLEET SERVICE CHARGES - FUEL 3,137 26 3,161 753 3,136 25
FLEET SERVICE CHARGES - DRIVERS 52 0 52 0 52 0
HIRE OF EXTERNAL VEHICLES 60 8 68 0 65 3
HIRE OF EXTERNAL PLANT 337 (9) 328 98 337 (9)
HIRE OF SKIPS 20 (3) 17 7 20 (3)
EXTERNAL TRANSPORT CONTRACT 0 0 0 19 0 0
PUPIL TRANSPORT - OTHER 126 0 125 (10) 125 0
TRANSPORT AND PLANT 22,625 (801) 22,320 3,212 22,622 (302)
ADMINISTRATION
PRINTING AND STATIONERY 119 8 125 19 131 (6)
TELEPHONES 94 15 108 0 93 15
MOBILE PHONES 70 0 70 0 70 0
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 8 0 8 0
ADVERTISING - OTHER 75 0 74 23 75 (1)
POSTAGES/COURIERS 38 (5) 33 9 39 (6)
MEMBERSHIP FEES/SUBSCRIPTIONS 32 23 54 84 31 23
INSURANCE 261 (1) 260 0 261 (1)
MEDICAL COSTS 20 (15) 6 4 21 (15)
LEGAL EXPENSES 37 (35) 2 19 2 0
HOSPITALITY / CIVIC RECOGNITION 3 0 3 3 3 0
INTERNET AGENCY FEES 23 0 23 8 23 0
SECURITY UPLIFT FEES 26 0 26 3 26 0
OTHER ADMIN COSTS 4 0 4 0 4 0
TRAINING 3 0 3 7 3 0
ADMINISTRATION 813 (10) 799 179 790 9
PAYMENT TO OTHER BODIES
SPTE: ANNUAL BUS SUBSIDY 1,891 0 1,891 1,315 1,891 0
SPTE: BUS OTHER 258 0 258 0 258 0
SPTE: FERRIES 29 0 29 0 29 0
SPTE: UNDERGROUND 1,318 0 1,318 0 1,318 0
SPTE: OTHER 1,727 0 1,727 0 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 0 131 32 131 0
YOUTH EMPLOYMENT TRAINING 0 0 0 61 0 0
OTHER LOCAL AUTHORITIES 55 20 75 18 55 20
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 22 0 22 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 39 0 39 0
PAYMENTS TO OTHER BODIES 634 0 10,101 1,098 10,101 0
EXTERNAL AUDIT FEES 3 0 3 2 3 0
ACTIVITIES PROGRAMME 70 0 70 12 70 0
COUNSELLING 5 0 5 0 5 0
PRIVATE INDIVIDUALS - GENERAL 0 0 607 0 607 0
PAYMENT TO OTHER BODIES 6,182 20 16,276 2,538 16,256 20
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 13,417 0 285 2,779 285 0
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 0 302 16 302 0
PAYMENT TO PRIVATE CONTRACTOR 37,700 (35) 37,665 9,775 37,701 (36)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 5 0 0
PAYMENT TO CONTRACTORS 51,419 (35) 38,252 12,575 38,288 (36)
52

Page 53

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Community & Enterprise Resources Summary Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 0 617 153 617 0
TRANSFER PAYMENTS 617 0 617 153 617 0
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 224 (17) 197 6 214 (17)
FINANCING CHARGES 224 (17) 197 6 214 (17)
TOTAL EXPENDITURE 202,320 42 201,945 47,037 201,381 564
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 0 (37) 22 (37) 0
CONTRIBUTIONS FROM DEVELOPENT 0 0 0 (35) 0 0
CONTRIBUTIONS FROM OTHER BODIES (354) 0 (12,814) (2,083) (12,814) 0
ERDF GRANT 0 0 0 (404) 0 0
SALES - GENERAL (4,247) 0 (4,247) (1,504) (4,247) 0
SALES - DEPARTMENTS OF THE AUTHORITY (126) 0 (126) (60) (126) 0
FEES AND CHARGES - GENERAL (9,229) (515) (10,161) (2,657) (9,592) (569)
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,378) 136 (6,829) (1,666) (6,995) 166
RENTAL INCOME (18) 0 (18) 0 (18) 0
FLEET SERVICES (12,553) 500 (12,553) (3,290) (12,553) 0
OTHER INCOME (1,519) 12 (1,507) (676) (1,521) 14
RECOVERY FROM CAPITAL (1,333) 0 (1,333) 0 (1,333) 0
RECHARGES - DEPARTMENTS OF THE AUTHORITY (40,684) (175) (27,727) (7,052) (27,552) (175)
TOTAL INCOME (77,478) (42) (77,352) (19,405) (76,788) (564)
NET EXPENDITURE 124,842 0 124,593 27,632 124,593 0
53

Page 54

54

Page 55

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 12 July 2024 (No 4)
Education Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Education 456.765 456.765 0.000 0.00% 121.881
Total Education Resources 456.765 456.765 0.000 0.00% 121.881
5
55

Page 56

Education Resources Variance Analysis 2024/25 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 435k under Teachers Basic - (1,015k) over 
APT&C Basic - 1,450k under
Schools - (1,015k) over 
Early Years - 1,450k
under
The projected overspend
relates to the increased use of
supply teachers for absence
cover. 
The projected underspend
mainly relates to Early Years
posts and is the result of staff
turnover.     
Transport and
Plant
(4,098k) over Pupil Transport - Strathclyde
Passenger Transport - (4,098k) over 
Schools - (4,098k) over  This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs.
Administration
Costs
53k under Conferences - 53k under Schools - 53k under  The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated.     
Payments to Other
Bodies 
1,085k under  Payments to Other Bodies - 1,100k
under 
Early Years - 1,100k
under 
This projected underspend is
due to less than anticipated
core Early Years spend
including cross boundary
charges to other Local
Authorities.
Transfer Payments 250k under Footwear and Clothing Grants - 250k
under 
Schools - 250k under  This projected underspend
reflects lower than anticipated
expenditure on footwear and
clothing grants during the
financial year, reflecting current
demand.
56

Page 57

Subjective Head Variance Subjective Line Service / amount Explanation
Income 2,338k over
recovered
Fees and Charges - Other Local
Authorities - 800k over recovered 
Early Years Fees - 1,538k over
recovered 
Schools - 800k over
recovered 
Early Years - 1,538k
over recovered
This projected over recovery
reflects the increase in income
recovered from other Local
Authorities for children
attending schools in South
Lanarkshire. This income is
used to support the cost of
external placements. 
This projected over recovery in
Early Years’ fees relates to
increased uptake of available
nursery places beyond 1140
hours. 
57

Page 58

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Education Resource - Total Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 180,659 (1,015) 180,585 50,546 181,600 (1,015)
TEACHERS SUPERANNUATION 41,344 0 41,344 12,985 41,344 0
TEACHERS NI 18,885 0 18,885 5,609 18,885 0
APT&C BASIC 67,335 1,450 69,190 18,358 67,740 1,450
APT&C OVERTIME 0 0 0 3 0 0
APT&C SUPERANNUATION 4,435 0 4,463 1,155 4,463 0
APT&C NIC 4,879 0 4,927 1,431 4,927 0
CARE STAFF - APT&C BASIC 0 0 0 36 0 0
CARE STAFF - APT&C SUPERANNUATION 0 0 0 2 0 0
CARE STAFF - APT&C NIC 0 0 0 3 0 0
MANUAL BASIC 0 0 0 56 0 0
MANUAL SUPERANNUATION 0 0 0 2 0 0
MANUAL NIC 0 0 0 2 0 0
SESSIONAL WORK 0 0 0 4 0 0
TRAVEL AND SUBSISTANCE 0 0 0 2 0 0
PENSION INCREASES 434 0 434 45 434 0
PREMATURE RETIRALS 5,041 0 5,041 306 5,041 0
EMPLOYEE COSTS 323,012 435 324,869 90,545 324,434 435
PROPERTY COSTS
RATES 17,898 0 17,898 0 17,898 0
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,385 0 1,385 73 1,385 0
SCOTTISH WATER - METERED CHARGES 782 0 782 146 782 0
RENT 266 0 266 38 266 0
SERVICE CHARGE 40 0 40 22 40 0
PROPERTY INSURANCE 480 0 480 0 480 0
SECURITY COSTS 68 0 68 13 68 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 62 0 62 2 62 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 0 0 20 20 20 0
ADAPTIONS - INTERNAL CONTRACTORS 50 0 50 36 50 0
ELECTRICITY  - CONTRACT 8,691 0 8,691 1,571 8,691 0
GAS 4,073 0 4,073 538 4,073 0
HEATING OIL 164 0 164 5 164 0
SOLID FUEL 171 0 171 95 171 0
JANITOR SERVICE 65 0 154 21 154 0
CLEANING CONTRACT 885 0 825 117 825 0
CLEANING OUTWITH CONTRACT 8 0 8 0 8 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 309 0 365 144 385 (20)
HEALTH & HYGIENE MATERIALS 45 0 45 1 45 0
WINDOW CLEANING 7 0 6 0 6 0
REFUSE UPLIFT 16 0 16 6 16 0
OTHER PROPERTY COSTS 161 0 161 0 161 0
OFFICE ACCOM-FACILITIES MANAGEMENT 0 0 4 4 4 0
ACCOMMODATION RECHARGE TO USERS 882 0 882 0 882 0
PROPERTY COSTS 36,508 0 36,616 2,852 36,636 (20)
58

Page 59

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Education Resource - Total Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 87 0 91 48 91 0
COMPUTER EQUIPMENT RENTAL 1 0 1 0 1 0
I.T. EQUIPMENT MAINT-CONTRACT 2,713 0 2,698 1,013 2,698 0
I.T. ELECTRONIC MESSAGING 22 0 0 0 0 0
EQUIPMENT, APPARATUS AND TOOLS 58 0 47 8 47 0
SMALL TOOLS 0 0 0 0 0 0
AIDS FOR CLIENTS 117 0 117 53 135 (18)
ADAPTATIONS FOR CLIENTS 0 0 0 2 0 0
SUPPLIES FOR CLIENTS 0 0 0 1 0 0
FURNITURE - OFFICE 1 0 1 0 1 0
FURNITURE - GENERAL 114 0 91 1 91 0
FURNISHINGS (INCL. CROCKERY & LINEN) 0 0 0 6 0 0
MATERIALS 0 0 0 4 0 0
MATERIALS, APPARATUS AND EQUIPMENT 1,914 (25) 1,628 502 1,653 (25)
PUPIL EQUITY FUNDING 7,673 0 7,694 4 7,694 0
LIBRARY/RESOURCE CENTREMATERIALS 81 0 82 16 82 0
AUDIO VISUAL 4 0 0 0 0 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 4 0 8 11 8 0
TV LICENCES - EDUCATION 24 0 23 1 23 0
FOODSTUFFS - GENERAL 77 0 54 60 54 0
PROTECTIVE CLOTHING & UNIFORMS 11 0 11 8 11 0
LAUNDRY COSTS 2 0 1 0 1 0
OTHER SUPPLIES AND SERVICES 23 0 23 0 23 0
HEALTH AND SAFETY 134 0 134 74 134 0
CATERING - CONTRACT 2,749 0 2,740 56 2,740 0
CATERING - OUTWITH CONTRACT 8 0 8 1 8 0
CATERING - EXTERNAL 2 0 0 3 0 0
DELIVERY CHARGE 1 0 0 1 0 0
SUPPLIES AND SERVICES 15,820 (25) 15,452 1,873 15,495 (43)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 22 0 0
POOL CAR CHARGES-RENTAL 0 0 0 4 0 0
OTHER TRANSPORT COSTS 2 0 2 0 2 0
INSURANCE 3 0 3 0 3 0
FLEET SERVICES - REPAIRS 0 0 0 1 0 0
FLEET SERVICE CHARGES - SCHEDULED MAINTENANCE 1,587 0 1,587 54 1,587 0
HIRE OF EXTERNAL VEHICLES 10 0 10 95 10 0
HIRE OF SKIPS 0 0 0 4 0 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 3 0 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 5,675 0 5,675 1,831 5,675 0
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 10,181 (4,098) 6,083 2,783 10,181 (4,098)
PUPIL TRANSPORT - OTHER 132 0 132 23 132 0
TRANSPORT AND PLANT 17,590 (4,098) 13,492 4,820 17,590 (4,098)
ADMINISTRATION
PRINTING AND STATIONERY 277 0 349 107 349 0
TELEPHONES 229 0 237 1 237 0
MOBILE PHONES 7 0 7 0 7 0
ADVERTISING - OTHER 11 0 11 0 11 0
POSTAGES/COURIERS 72 0 72 13 72 0
MEMBERSHIP FEES/SUBSCRIPTIONS 13 0 80 66 80 0
INSURANCE 76 0 76 0 76 0
MEDICAL COSTS 1 0 11 11 11 0
LEGAL EXPENSES 0 0 1 1 1 0
SECURITY UPLIFT FEES 0 0 3 2 3 0
OTHER ADMIN COSTS 2 0 2 0 2 0
CONFERENCES - MEMBERS (incl associated 0 0 4 4 4 0
CONFERENCES - OFFICIALS (incl associated costs) 0 53 53 0 0 53
TRAINING 89 0 198 106 198 0
ADMINISTRATION 777 53 1,104 311 1,051 53
59

Page 60

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Education Resource - Total Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 0 0 0 21 0 0
OTHER LOCAL AUTHORITIES 1,446 (15) 1,431 328 1,446 (15)
SCOTTISH QUALIFICATIONS AUTHORITY 1,563 0 1,563 1,570 1,563 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 0 0 0 10 0 0
PAYMENTS TO OTHER BODIES 18,582 1,100 19,832 6,046 18,732 1,100
INDEPENDENT SCHOOL PLACES 3,725 0 3,725 1,569 3,725 0
CONTRACT SPEECH THERAPY 678 0 678 0 678 0
SCHOOL ACTIVITIES 104 0 99 83 99 0
RESEARCH GRANTS - EDUCATION 13 0 20 45 20 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 28 0 28 3 28 0
P.E. FACILITIES 123 0 104 0 104 0
ACTIVITIES PROGRAMME 1 0 1 143 1 0
COUNSELLING 1,228 0 1,228 183 1,228 0
COPYRIGHT AGREEMENT 0 0 27 213 27 0
VAT FREE EXCURSIONS - EDUCATION 0 0 0 17 0 0
PRIVATE INDIVIDUALS - GENERAL 0 0 0 9 0 0
PAYMENT TO OTHER BODIES 27,491 1,085 28,736 10,240 27,651 1,085
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 46,332 0 46,332 11,553 46,332 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 8 0 0
PAYMENT TO CONTRACTORS 46,332 0 46,332 11,561 46,332 0
TRANSFER PAYMENTS
RENT REBATES 0 0 0 265 0 0
FOOTWEAR & CLOTHING GRANTS 2,023 250 2,273 1,476 2,023 250
WORK EXPERIENCE 22 0 20 0 20 0
CONCESSIONARY FARES
TRANSFER PAYMENTS 2,045 250 2,293 1,741 2,043 250
FINANCING CHARGES
LEASING CHARGES - FINANCE 0 0 0 1 0 0
LEASING CHARGES - OPERATIONAL 3 0 3 0 3 0
I.T. EQUIPMENT LEASING - CONTRACT 402 0 387 68 387 0
FINANCING CHARGES 405 0 390 69 390 0
TOTAL EXPENDITURE 469,980 (2,300) 469,284 124,012 471,622 (2,338)
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) 0 (170) (43) (170) 0
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (8,988) 0 (8,988) (267) (8,988) 0
CONTRIBUTIONS FROM OTHER BODIES (1,185) 0 (1,185) (1,084) (1,185) 0
FEES AND CHARGES - GENERAL 0 0 0 (6) 0 0
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,570) 800 (770) 0 (1,570) 800
PLAYGROUP ACCOMMODATION CHARGE (10) 0 (10) (7) (10) 0
EARLY YEARS FEES (1,935) 1,500 (435) (722) (1,973) 1,538
RENTAL INCOME (20) 0 (20) 0 (20) 0
COURSE FEES (35) 0 (35) 0 (35) 0
OTHER INCOME (24) 0 (24) (2) (24) 0
ACCOMMODATION INCOME FROM USERS (882) 0 (882) 0 (882) 0
INCOME (14,819) 2,300 (12,519) (2,131) (14,857) 2,338
NET EXPENDITURE 455,161 0 456,765 121,881 456,765 0
60

Page 61

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 12 July 2024 (No 4)
Finance and Corporate Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Finance Services - Strategy 1.851 1.851 0.000 0.00% 0.925
Finance Services - Transactions 16.775 16.775 0.000 0.00% 6.405
Audit and Compliance Services 0.318 0.318 0.000 0.00% 0.142
Information Technology Services 6.852 6.852 0.000 0.00% 4.501
Communications and Strategy Services 2.372 2.372 0.000 0.00% 0.675
Administration and Licensing Services 4.048 4.048 0.000 0.00% 1.350
Personnel Services 6.296 6.296 0.000 0.00% 1.917
Total Finance and Corporate Resources 38.512 38.512 0.000 0.00% 15.915
5
61

Page 62

Finance and Corporate Resources Variance Analysis 2024/25 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  115k under  APT&C Basic, Superannuation,
NI/Other Employee Costs – 115k
under
Finance Services
(Strategy) – 52k under
The projected underspend is
due to the anticipated level of
turnover during the year. 
Finance Services
(Transactions) – 65k
under 
IT Services – 30k under 
Admin, Legal and
Licensing – (32k) over
The projected underspend
relates to vacancies being
reviewed in line with service
requirements. 
The projected underspend is
due to the anticipated level of
turnover during the year. 
The projected overspend is
due to lower than budgeted
turnover during the year.
Supplies and Services (30k) over Computer Equipment Purchase –
(30k) over
IT Services – (15k) over  The projected overspend is
due to greater than budgeted
IT costs. 
Administration Costs (26k) over Postages/Couriers – (25k) over Finance Services
(Transactions) – (25k
over)
The overspend in
Administration Costs is due
to higher than budgeted
postage costs for Council Tax
billing. 
Payments to Other
Bodies
(84k) over External Audit Fees – (72k) over Finance Services
(Strategy) – 72k over
The projected overspend is a
result of the expected uplift
for External Audit Fees. 
62

Page 63

Subjective Head Variance  Subjective line Service / amount Explanation
Financing Charges (40k) over IT Equipment Leasing Contract –
(40k) over
Finance Services
(Transactions) – (40k)
over
The overspend in Financing
Charges is due to higher than
budgeted IT leasing charges. 
Income  65k over
recovered
Other Income – 55k over recovered Personnel – 45k over
recovered
The over-recovery of income
relates to greater than
budgeted external income for
Modern Apprentices and
internal income for recharges
relating to Scottish Vocational
Qualifications. 
63

Page 64

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Finance & Corporate Resources - Total Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC
TEACHERS OVERTIME 0 0 0 1 0 0
APT & C BASIC 26,499 160 26,543 7,208 26,457 86
APT & C OVERTIME 109 (9) 100 56 100 0
APT & C SUPERANNUATION 1,855 26 1,868 313 1,824 44
APT & C NIC 2,624 (107) 2,596 718 2,611 (15)
OTHER EMPLOYEE COSTS 0 0 39 0 39 0
PENSION INCREASES 984 0 984 91 984 0
EMPLOYEE COSTS 32,071 70 32,130 8,387 32,015 115
PROPERTY COSTS
RENT 5 0 5 2 5 0
SECURITY COSTS 121 0 121 0 121 0
REPAIRS & MAINTENANCE - INTERNAL CONTRATOR 0 0 0 1 0 0
FIXTURE & FITTINGS 1,557 0 1,557 355 1,557 0
HEALTH & HYGIENE MATERIALS 0 0 0 1 0 0
OTHER PROPERTY COSTS 2,183 0 2,183 0 2,183 0
PROPERTY COSTS 3,866 0 3,866 359 3,866 0
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 4,415 (15) 4,020 1,644 4,020 0
COMPUTER EQUIPMENT MAINTENANCE 2,327 0 2,048 606 2,078 (30)
I.T. EQUIPMENT MAINT - CONTRACT 595 0 594 293 594 0
I.T. ELECTRONIC MESSAGING 76 0 41 0 41 0
EQUIPMENT, APPARATUS AND TOOLS 0 0 154 46 154 0
SUPPLIES FOR CLIENTS 219 0 219 13 219 0
FURNITURE - OFFICE 1 0 1 (1) 1 0
MATERIALS 112 0 112 26 112 0
MATERIALS, APPARATUS AND EQUIPMENT 2 0 2 3 2 0
AUDIO VISUAL 0 0 0 0 0 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 4 0 4 0 4 0
FOODSTUFFS - GENERAL 25 0 24 1 24 0
PROTECTIVE CLOTHING & UNIFORMS 2 0 2 0 2 0
OTHER SUPPLIES AND SERVICES 36 0 37 22 37 0
CATERING - OUTWITH CONTRACT 6 0 6 0 6 0
OUTSOURCED MAIL 175 0 175 82 175 0
SUPPLIES AND SERVICES 7,995 (15) 7,439 2,735 7,469 (30)
TRANSPORT AND PLANT
POOL CAR CHARGES - RENTAL 18 0 17 0 17 0
POOL CAR CHARGES - FUEL 3 0 3 0 3 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 1 0 1 0 1 0
FLEET SERVICE CHARGES - LEASING 2 0 2 1 2 0
FLEET SERVICE CHARGES - FUEL 1 0 1 0 1 0
FLEET SERVICE CHARGES - DRIVERS 9 0 9 0 9 0
TRANSPORT AND PLANT 34 0 33 1 33 0
64

Page 65

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Finance & Corporate Resources - Total Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 524 0 523 29 523 0
TELEPHONES 1,567 0 1,553 327 1,553 0
MOBILE PHONES 177 0 175 15 175 0
ADVERTISING - RECRUITMENT 29 0 29 0 29 0
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 1 0 1 0
ADVERTISING - OTHER 123 0 123 25 123 0
POSTAGES/COURIERS 935 (20) 915 412 940 (25)
SMS MESSAGING 10 0 10 2 10 0
MEMBERSHIP FEES/SUBSCRIPTIONS 233 0 229 5 231 (2)
INSURANCE 140 0 141 0 141 0
MEDICAL COSTS 351 0 350 88 350 0
LEGAL EXPENSES 183 0 183 29 183 0
HOSPITALITY / CIVIC RECOGNITION 24 0 31 0 30 1
PAYPOINT AGENCY FEES 70 0 70 21 70 0
SECURITY UPLIFT FEES 2 0 2 0 2 0
OTHER ADMIN COSTS 1,604 0 1,604 243 1,604 0
MEMBERS ALLOWANCES 1,871 0 1,871 467 1,871 0
CONFERENCES - MEMBERS (incl associated costs) 11 0 11 3 11 0
CONFERENCES - OFFICIALS (incl associated costs) 6 0 6 0 6 0
TRAINING 762 0 761 159 761 0
VOLUNTEERS' EXPENSES 7 0 7 2 7 0
INTERNAL SUPPORT SERVICES ALLOCATION 68 0 68 0 68 0
ADMINISTRATION 8,698 (20) 8,663 1,827 8,689 (26)
PAYMENT TO OTHER BODIES
MANAGEMENT AND TECHNOLOGY TRAINING GRANT 0 0 0 1 0 0
YOUTH EMPLOYMENT TRAINING INITIATIVE 0 0 0 (1) 0 0
GRANTS TO VOLUNTARY ORGANISATIONS 652 27 679 271 646 33
PAYMENTS TO OTHER BODIES 2,592 (30) 2,562 1,132 2,607 (45)
EXTERNAL AUDIT FEES 658 (58) 600 0 672 (72)
ELECTION COSTS 0 0 0 30 0 0
PAYMENT TO OTHER BODIES 3,902 (61) 3,841 1,433 3,925 (84)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 28 0 28 48 28 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 249 0 249 25 249 0
PAYMENT TO CONTRACTORS 277 0 277 73 277 0
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 0 23,581 5,865 23,581 0
RENT REBATES 41,707 0 41,707 9,997 41,707 0
TRANSFER PAYMENTS 65,288 0 65,288 15,862 65,288 0
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 1 0 1 0 1 0
I.T. EQUIPMENT LEASING-CONTRACT 1,274 (20) 1,213 801 1,253 (40)
FINANCING CHARGES 1,275 (20) 1,214 801 1,254 (40)
TOTAL EXPENDITURE 123,406 (46) 122,751 31,478 122,816 (65)
65

Page 66

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Finance & Corporate Resources - Total Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
INCOME
NON RELEVANT GOVERNMENT GRANT (850) 0 (850) 0 (850) 0
STATUTORY ADDITIONS - COST OF COLLECTION (865) 0 (865) 0 (865) 0
RENT REBATES SUBSIDY (37,191) 0 (37,191) (8,286) (37,191) 0
RENT ALLOWANCE SUBSIDY (23,067) 0 (23,067) (4,787) (23,067) 0
DWP SUBSIDY (1,170) 0 (1,170) (368) (1,170) 0
DHP 0 0 0 (347) 0 0
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (150) 0 (150) (46) (150) 0
CONTRIBUTIONS FROM OTHER BODIES (105) 0 (105) (57) (105) 0
SALES - DEPARTMENTS OF THE AUTHORITY (20) 0 (20) 0 (20) 0
FEES AND CHARGES - GENERAL (4,352) 6 (4,347) (848) (4,357) 10
CHARGES TO HEALTH BOARDS (45) 0 (45) 0 (45) 0
FEES AND CHARGES - OTHER BODIES (222) 0 (222) (26) (222) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,482) 0 (2,489) (449) (2,489) 0
HOME LOANS REPAYMENTS (5) 0 (5) (7) (5) 0
BIRTH REGISTRATION (19) 0 (19) (4) (19) 0
DEATH REGISTRATION (73) 0 (73) (17) (73) 0
MARRIAGE STATUTORY FEES (95) 0 (95) (42) (95) 0
EXTRACT ISSUE (88) 0 (88) (24) (88) 0
MARRIAGES (49) 0 (49) (14) (49) 0
CITIZENSHIP CEREMONIES (11) 0 (11) (4) (11) 0
OTHER INCOME (8,047) 40 (6,700) (237) (6,755) 55
REALLOCATION OF CENTRAL SUPPORT COSTS (6,653) 0 (6,653) 0 (6,653) 0
REALLOCATION OF SUPPORT COSTS (25) 0 (25) 0 (25) 0
INCOME (85,584) 46 (84,239) (15,563) (84,304) 65
NET EXPENDITURE 37,822 0 38,512 15,915 38,512 0
66

Page 67

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 12 July 2024 (No 4)
Housing and Technical Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Housing Services 8.767 8.718 0.049 0.56% 1.020
Property Services 4.774 4.823 (0.049) -1.03% 12.548
Total Housing and Technical Resources 13.541 13.541 (0.000) 0.00% 13.568
5
67

Page 68

Housing and Technical Resources (excl HRA) Variance Analysis 2024/25 (Period 4) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 2,380k
under
APT&C Basic / Overtime /
Superannuation / National Insurance
– 2,382k under
Property Services –
1,112k under 
The variance relates to
vacancies which are actively
being recruited in line with
Service requirements. 
Property Services –
1,297k under 
The variance reflects the
current level of trade operatives
and overtime required to meet
service demands.   
Property Costs (549k) over Rates – 195k under  Property Services -
195k under 
The variance relates to an
anticipated underspend in rates
charges for Montrose House. 
Service Charges – (336k) over  Property Services -
(324k) over
The overspend relates to the
cost of shopping centre service
charges which are not
recoverable from tenants.     
Bed & Breakfast – (148k) over 
Repairs & Maintenance – (279k) over 
Housing Services –
(148k) over 
Property Services -
(300k) over 
The overspend relates to
greater than anticipated
demand for the service. 
The overspend relates to
additional expenditure in
property maintenance.  
Fixture & Fittings – (125k) over  Housing Services –
(125k) over 
This relates to the furniture
costs within homeless
temporary accommodation and
is demand led.
68

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors
(248k) over Payment to Private Contractors – 78k
under 
Payment to External Consultants –
(326k) over 
Housing Services –
78k under 
Property Services –
(326k) over 
The underspend relates to
commissioned services in the
Homelessness budget where
expenditure varies according to
service requirements. 
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet current service demands.
Income  (1,366k)
under
recovered
Rental Income - (218k) under
recovered 
Recovery from Capital/Recharges -
Departments of the Authority -
(1,145k) under recovered 
Property Services -
(218k) under recovered 
Property Services -
(1,145k) under
recovered 
The under recovery relates to
the shopping centre income,
which is lower than budgeted
due to vacant units. 
The level of income recovered
varies depending on the current
workload and the timing of a
wide variety of projects and is
offset by a reduction in
expenditure. 
* The underlined variances represent new variances since the last report.
69

Page 70

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Housing & Technical Resources Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 35,730 1,356 37,086 9,284 35,362 1,724
APT & C OVERTIME 139 651 790 372 205 585
APT & C SUPERANNUATION 2,420 42 2,462 593 2,490 (28)
APT & C NIC 3,810 (25) 3,785 982 3,684 101
OTHER EMPLOYEE COSTS 489 0 489 152 488 1
PENSION INCREASES 602 0 602 69 604 (2)
ADDITIONAL PENSION COSTS 13 0 13 0 14 (1)
EMPLOYEE COSTS 43,203 2,024 45,227 11,452 42,847 2,380
PROPERTY COSTS
RATES 2,054 200 2,254 0 2,059 195
SCOTTISH WATER - UNMETERED CHARGES 12 0 12 (14) 12 0
SCOTTISH WATER - METERED CHARGES 268 (27) 241 65 268 (27)
RENT 1,743 (12) 1,731 720 1,745 (14)
SERVICE CHARGE 787 (348) 439 217 775 (336)
FACTORING CHARGES 9 0 9 2 9 0
OTHER ACCOMMODATION COSTS 2,550 (276) 2,674 167 2,550 124
BED AND BREAKFAST 175 (148) 27 20 175 (148)
PROPERTY INSURANCE 386 0 386 3 386 0
SECURITY COSTS 299 0 299 79 299 0
GROUND MAINTENANCE 52 0 52 0 52 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 0 10 3 10 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 3,449 (536) 3,113 359 3,392 (279)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 0 0 0 0 0 0
LIFE CYCLE MAINTENANCE 754 0 754 401 754 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 395 0 395 610 395 0
ADAPTIONS - INTERNAL CONTRACTORS 0 0 0 9 0 0
GAS MAINTENANCE COSTS 0 0 0 2 0 0
ELECTRICAL HEATING MAINTENANCE 0 0 0 7 0 0
HOUSING - RENT W/O UNLET PERIODS 736 (24) 811 137 785 26
HOUSING - RENT W/O BAD PERIODS 681 97 728 8 631 97
ASBESTOS 0 0 0 149 0 0
ELECTRICITY  - CONTRACT 1,497 (51) 1,446 410 1,498 (52)
ELECTRICITY  - NON CONTRACT 31 (2) 29 1 31 (2)
GAS 577 (1) 576 143 579 (3)
HEATING OIL 12 0 12 0 12 0
FIXTURE & FITTINGS 1,295 (375) 1,170 470 1,295 (125)
JANITOR SERVICE 164 0 164 152 164 0
CLEANING CONTRACT 407 0 407 400 421 (14)
CLEANING OUTWITH CONTRACT 0 0 0 9 0 0
CLEANING MATERIALS 10 0 10 2 10 0
WINDOW CLEANING 2 0 2 1 2 0
PEST CONTROL 18 (12) 6 0 18 (12)
REFUSE UPLIFT 412 (7) 405 4 412 (7)
REMOVAL & STORAGE COSTS 20 28 48 2 20 28
OTHER PROPERTY COSTS 556 0 556 192 556 0
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 0 1,113 639 1,113 0
ACCOMMODATION RECHARGE TO USERS 33 0 33 12 33 0
PROPERTY COSTS 20,507 (1,494) 19,912 5,381 20,461 (549)
70

Page 71

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Housing & Technical Resources Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 474 0 446 46 446 0
COMPUTER EQUIPMENT MAINTENANCE 6 0 6 0 6 0
I.T. EQUIPMENT MAINT-CONTRACT 223 (1) 209 1 211 (2)
EQUIPMENT, APPARATUS AND TOOLS 46 0 45 22 45 0
SMALL TOOLS 0 0 0 0 0 0
ADAPTATIONS FOR CLIENTS 500 0 500 74 500 0
FURNITURE - OFFICE 0 0 0 1 0 0
FURNISHINGS 0 0 0 31 0 0
MATERIALS 12,330 0 12,329 978 12,329 0
STOCK/STORE ISSUES 0 0 0 429 0 0
AUDIO VISUAL 10 0 10 0 10 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0 2 0
TV LICENCES - EDUCATION 1 0 1 0 1 0
FOODSTUFFS - GENERAL 2 0 2 0 2 0
PROTECTIVE CLOTHING & UNIFORMS 44 0 44 5 44 0
OTHER SUPPLIES AND SERVICES 167 0 168 18 168 0
HEALTH AND SAFETY 1 0 1 0 1 0
CATERING - CONTRACT 1 0 1 0 1 0
CATERING - OUTWITH CONTRACT 0 0 0 2 0 0
MAJOR SUPPLY OF ELECTRICAL POWER 0 0 0 8 0 0
OUTSOURCED MAIL 0 0 0 8 0 0
BULK BUYING DISCOUNT 0 0 0 (1) 0 0
SUPPLIES AND SERVICES 13,807 (1) 13,764 1,622 13,766 (2)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 4 0 0
PURCHASE OF PLANT 125 0 125 34 125 0
FLEET SERVICES - FUEL 1 0 1 4 1 0
POOL CAR RECHARGE - RENTAL CHARGE 98 0 98 8 98 0
POOL CAR RECHARGE - FUEL 24 2 26 0 24 2
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0 1 0
OTHER TRANSPORT COSTS 0 0 0 1 0 0
TRANSPORT INSURANCE 44 0 44 0 45 (1)
PLANT SERVICES 7 0 7 0 7 0
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 331 0 331 183 331 0
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 1 0 1 0
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 0 7 4 7 0
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 0 15 11 15 0
FLEET SERVICE CHARGES LEASING 1,402 0 1,402 88 1,402 0
FLEET SERVICE CHARGES HIRED VEHICLES 205 0 205 60 209 (4)
FLEET SERVICE CHARGES CONTRACT HIRE 48 0 48 0 48 0
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 117 0 117 76 117 0
FLEET SERVICE CHARGES FUEL 842 0 842 220 842 0
HIRE OF EXTERNAL PLANT 257 0 257 37 256 1
HIRE OF SCAFOLDING 1,077 0 1,077 234 1,077 0
HIRE OF SKIPS 33 0 33 122 33 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 5 0 0
TAXI CHARGES - CONTRACTED 42 (1) 41 3 42 (1)
TRANSPORT AND PLANT 4,677 1 4,678 1,094 4,681 (3)
71

Page 72

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Housing & Technical Resources Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 81 0 81 20 84 (3)
TELEPHONES 95 (1) 94 (3) 95 (1)
MOBILE PHONES 38 2 40 0 38 2
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 7 0 7 0 7 0
ADVERTISING - OTHER 6 0 6 0 6 0
POSTAGES/COURIERS 21 0 21 9 21 0
MEMBERSHIP FEES/SUBSCRIPTIONS 12 0 12 76 13 (1)
INSURANCE 223 (7) 216 0 228 (12)
MEDICAL COSTS 16 0 16 2 16 0
LEGAL EXPENSES 20 (2) 18 4 20 (2)
PETTY OUTLAYS 12 0 12 7 12 0
HOSPITALITY / CIVIC RECOGNITION 2 0 2 0 2 0
BANK CHARGES 0 0 0 4 0 0
PAYPOINT AGENCY FEES 0 0 0 3 0 0
OTHER ADMIN COSTS 13 0 13 0 13 0
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 457 20 457 0
CENTRAL ADMINISTRATION 2,749 0 2,749 0 2,860 (111)
ADMINISTRATION 3,752 (8) 3,744 142 3,872 (128)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,019 0 2,019 143 2,079 (60)
OTHER LOCAL AUTHORITIES 0 0 0 5 0 0
PAYMENTS TO OTHER BODIES 1,164 (44) 1,120 303 1,164 (44)
SUPPORTING PEOPLE INTERNAL PROVIDER 1,129 0 1,129 373 1,129 0
SUPPORTING PEOPLE EXTERNAL PROVIDER 732 50 782 5 725 57
HOUSING ADMINISTRATION 885 0 885 75 885 0
ASSISTANCE TO HOME OWNERS (33) (36) (69) 150 (33) (36)
PRIVATE INDIVIDUALS - GENERAL 168 0 168 29 168 0
PAYMENT TO OTHER BODIES 6,064 (30) 6,034 1,083 6,117 (83)
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 0 0 0 3 0 0
PAYMENT TO PRIVATE CONTRACTOR 11,945 825 12,070 4,699 11,992 78
PAYMENT TO EXTERNAL CONSULTANTS 606 (300) 306 30 632 (326)
PAYMENT TO CONTRACTORS 12,551 525 12,376 4,732 12,624 (248)
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 154 0 154 6 155 (1)
INTEREST ON REVENUE BALANCES 2 0 2 0 2 0
FINANCING CHARGES 156 0 156 6 157 (1)
TOTAL EXPENDITURE 104,717 1,017 105,891 25,512 104,525 1,366
INCOME
CONTRIBUTIONS FROM OTHER BODIES (2,361) 0 (2,361) (479) (2,361) 0
SALES - DEPARTMENTS OF THE AUTHORITY (460) 0 (460) 0 (486) 26
FEES AND CHARGES - GENERAL (694) 113 (581) (104) (694) 113
FEES AND CHARGES - DEPARTMENTS OF THE A (48) 0 (48) 0 (48) 0
RENTAL INCOME (3,927) (200) (4,127) (942) (3,909) (218)
HOUSE RENTS (5,994) (13) (6,207) (1,599) (5,994) (213)
OTHER INCOME (2,793) 46 (2,747) (632) (2,817) 70
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 (876) 95 (876) 0
REALLOCATION OF SUPPORT COSTS (1,580) (49) (1,629) 0 (1,630) 1
RECOVERY FROM CAPITAL (27,721) (3,701) (31,422) (3,572) (27,054) (4,368)
RECHARGES - DEPARTMENTS OF AUTHORITY (44,679) 2,787 (41,892) (8,514) (45,115) 3,223
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 0 0 3,803 0 0
INCOME (91,133) (1,017) (92,350) (11,944) (90,984) (1,366)
NET EXPENDITURE 13,584 0 13,541 13,568 13,541 0
72

Page 73

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2024/25 (Period 4) 
There are no variances to report. 
5
73

Page 74

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Housing Revenue Account Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 11,629 0 11,629 3,141 11,629 0
APT & C OVERTIME 78 0 78 14 78 0
APT & C SUPERANNUATION 722 0 722 198 722 0
APT & C NIC 1,142 0 1,142 287 1,142 0
PENSION INCREASES 211 0 211 22 211 0
EMPLOYEE COSTS 13,782 0 13,782 3,662 13,782 0
PROPERTY COSTS
RATES 72 0 72 0 72 0
SCOTTISH WATER - UNMETERED CHARGES 4 0 4 0 4 0
SCOTTISH WATER - METERED CHARGES 8 0 8 2 8 0
RENT 6 0 6 0 6 0
SERVICE CHARGE 94 0 94 1 94 0
OTHER ACCOMMODATION COSTS 11 0 11 0 11 0
PROPERTY INSURANCE 2,160 0 2,160 0 2,160 0
SECURITY COSTS 55 0 55 1 55 0
GROUND MAINTENANCE 4,465 0 4,465 245 4,465 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 41,997 0 41,997 7,221 41,997 0
LIFE CYCLE MAINTENANCE 0 0 0 16 0 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 0 877 140 877 0
HOUSING - RENT FREE ACCOMMODATION 266 0 266 62 266 0
HOUSING - RENT W/O UNLET PERIODS 2,588 0 2,588 757 2,588 0
HOUSING - RENT W/O BAD PERIODS 3,743 0 3,743 163 3,743 0
ASBESTOS 139 0 139 40 139 0
GAS SOUNDNESS TESTING 0 0 0 3 0 0
ELECTRICITY  - CONTRACT 1,358 0 1,358 207 1,358 0
GAS 436 0 436 114 436 0
HEATING OIL 54 0 54 11 54 0
SOLID FUEL 4 0 4 5 4 0
FIXTURE & FITTINGS 58 0 58 44 58 0
JANITOR SERVICE 93 0 93 30 93 0
CLEANING CONTRACT 468 0 468 493 468 0
CLEANING MATERIALS 60 0 60 6 60 0
WINDOW CLEANING 16 0 16 38 16 0
PEST CONTROL 122 0 122 31 122 0
REFUSE UPLIFT 0 0 0 10 0 0
REMOVAL & STORAGE COSTS 14 0 14 11 14 0
OTHER PROPERTY COSTS 35 0 35 3 35 0
PROPERTY COSTS 59,203 0 59,203 9,654 59,203 0
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 1,365 0 1,365 102 1,365 0
I.T. EQUIPMENT MAINT-CONTRACT 74 0 74 0 74 0
EQUIPMENT, APPARATUS AND TOOLS 13 0 13 5 13 0
ADAPTATIONS FOR CLIENTS 0 0 0 22 0 0
FURNITURE - OFFICE 10 0 10 0 10 0
FURNITURE - GENERAL 0 0 0 4 0 0
MATERIALS 0 0 0 39 0 0
MATERIALS, APPARATUS AND EQUIPMENT 0 0 0 2 0 0
FOODSTUFFS - GENERAL 6 0 6 0 6 0
PROTECTIVE CLOTHING & UNIFORMS 12 0 12 1 12 0
LAUNDRY COSTS 16 0 16 0 16 0
OTHER SUPPLIES AND SERVICES 32 0 32 6 32 0
HEALTH AND SAFETY 15 0 15 0 15 0
OUTSOURCED MAIL 0 0 0 3 0 0
SUPPLIES AND SERVICES 1,543 0 1,543 184 1,543 0
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 2 0 0
POOL CAR RECHARGE - RENTAL CHARGE 26 0 26 1 26 0
POOL CAR RECHARGE - FUEL 6 0 6 0 6 0
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0 1 0
OTHER TRANSPORT COSTS 0 0 0 3 0 0
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 158 0 158 14 158 0
STORAGE 4 0 4 0 4 0
TRANSPORT AND PLANT 195 0 195 20 195 0
74

Page 75

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Housing Revenue Account Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 79 0 79 52 79 0
BULK PRINTING 68 0 68 0 68 0
TELEPHONES 95 0 95 1 95 0
MOBILE PHONES 34 0 34 (1) 34 0
ADVERTISING - OTHER 12 0 12 0 12 0
POSTAGES/COURIERS 171 0 171 26 171 0
SMS MESSAGING 0 0 0 5 0 0
MEMBERSHIP FEES/SUBSCRIPTIONS 38 0 38 0 38 0
MEDICAL COSTS 25 0 25 4 25 0
LEGAL EXPENSES 6 0 6 11 6 0
PETTY OUTLAYS 4 0 4 0 4 0
GIRO BANK AGENCY FEES 4 0 4 0 4 0
PAYPOINT AGENCY FEES 13 0 13 11 13 0
INTERNET AGENCY FEES 3 0 3 0 3 0
OTHER ADMIN COSTS 15 0 15 1 15 0
CONFERENCES - OFFICIALS 7 0 7 0 7 0
INTERNAL SUPPORT SERVICES ALLOCATION 5,020 0 5,020 0 5,020 0
ADMINISTRATION 5,594 0 5,594 110 5,594 0
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,909 0 2,909 601 2,909 0
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 3 0 3 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 0 31 0 31 0
PAYMENTS TO OTHER BODIES 32 0 32 94 32 0
PRIVATE INDIVIDUALS - GENERAL 0 0 0 18 0 0
PAYMENT TO OTHER BODIES 2,975 0 2,975 713 2,975 0
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 134 0 0
PAYMENT TO PRIVATE CONTRACTOR 80 0 80 4 80 0
PAYMENT TO EXTERNAL CONSULTANTS 20 0 20 47 20 0
PAYMENT TO CONTRACTORS 100 0 100 185 100 0
FINANCING CHARGES
INTEREST-DEBT CHARGES 10,729 0 10,729 3,301 10,729 0
I.T. EQUIPMENT LEASING-CONTRACT 67 0 67 2 67 0
CFCR 33,506 0 33,506 10,310 33,506 0
INTEREST ON REVENUE BALANCES (67) 0 (67) 0 (67) 0
FINANCING CHARGES 44,235 0 44,235 13,613 44,235 0
TOTAL EXPENDITURE 127,627 0 127,627 28,141 127,627 0
INCOME
SALES - DEPARTMENTS OF THE AUTHORITY (885) 0 (885) (75) (885) 0
FEES AND CHARGES - GENERAL (4,747) 0 (4,747) (1,449) (4,747) 0
RENTAL INCOME (461) 0 (461) 0 (461) 0
HOUSE RENTS (111,802) 0 (111,802) (28,206) (111,802) 0
LOCK UP RENTS (2,802) 0 (2,802) (697) (2,802) 0
INSURANCE RECOVERIES (250) 0 (250) 2,655 (250) 0
OTHER INCOME (1,734) 0 (1,734) (369) (1,734) 0
REALLOCATION OF SUPPORT COSTS (717) 0 (717) 0 (717) 0
YEAR END T/FER TO BALANCE SHEET (4,229) 0 (4,229) 0 (4,229) 0
INCOME (127,627) 0 (127,627) (28,141) (127,627) 0
NET EXPENDITURE 0 0 0 0 0 0
75

Page 76

76

Page 77

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 12 July 2024 (No 4)
Social Work Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Performance and Support Services 5.800 5.738 0.062 1.07% 1.261
Children and Families 46.985 47.358 (0.373) -0.79% 12.415
Adults and Older People 180.475 180.475 0.000 0.00% 46.599
Justice and Substance Misuse 0.735 0.424 0.311 42.31% 0.081
Total Social Work Resources 233.995 233.995 0.000 0.00% 60.356
5
77

Page 78

Social Work Resources Variance Analysis 2024/25 (Period 4) 
Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs  2,067k under Admin & Clerical Staff – 518k under 
Managerial Support Specialist Staff -
(1,334k) over 
Performance and
Support – 130k under 
Adult and Older People –
279k under 
Justice – 95k under 
Performance and
Support – (67k) over 
Children and Families –
114k under 
Adult and Older People –
(1,428k) over 
The underspend relates to
staffing vacancies which are
being filled. 
The underspend relates to
Scheduling Assistant vacancies
in Homecare, which are being
recruited. This is offset by
overtime costs for Managerial
Support Specialist Staff (below). 
The underspend relates to
staffing vacancies which are
being filled. 
This overspend is a result of
turnover being less than
anticipated to date. 
This is a result of vacancies
which are actively being
recruited. 
This overspend is a result of
turnover being less than
anticipated to date, and overtime
spend to cover the Scheduling
Assistant vacancies in Homecare
(above). 
78

Page 79

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.)   
Basic Grade Social Workers – 1,844k
under 
Hospital Social Workers – (146k) over 
Instructors – 281k under 
Care Staff – (624k) over 
Justice – 73k under 
Children and Families 
- 439k under 
Adult and Older People –
1,504k under 
Justice – 90k under 
Adult and Older People –
(112k) over 
Adult and Older People – 
233k under 
Children and Families –
(262k) over 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This overspend is due to
additional posts being filled to
meet demand within the hospital
discharge team and is offset by
the underspend in Social
Workers (above). 
This is a result of vacancies
which are being actively
recruited. 
This overspend is due to the level
of overtime being incurred to
manage staff absences due to
sickness and maternity leave. 
79

Page 80

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Home Carers – 1,527k under 
Adult and Older People –
(372k) over 
Adult and Older People –
1,551k under 
This overspend is due to
overtime worked because of In
House Residential vacancies. 
This is a result of vacancies
which are being actively
recruited.
Property Costs 373k under Gas - 376k under  Adult and Older People –
376k under 
The underspend reflects a
reduction in consumption and
price.
Transport and
Plant 
(645k) over Fleet Service Charges – (626k) over  Adult and Older People –
(626k) over 
The overspend relates to
slippage in the 2024/25 saving for
the decommissioning of Fleet
buses that are no longer
required. An action plan is being
developed to ensure costs are
reduced to achieve the saving in
full. 
Payment to Other
Bodies 
133k under  Social Work – Adoption Allowance –
(100k) over 
Direct Payments – 236k under 
Children and Families –
(100k) over 
Adult and Older People –
236k under
This overspend relates to the
increasing number of adoptive
carers being paid an ongoing
adoption allowance. The scheme
is currently being reviewed. 
The underspend reflects current
demand of Direct Payments.
80

Page 81

* The underlined variances represent new variances since the last report. 
Subjective Head Variance Subjective line Service / amount Explanation
Payment to
Contractors
(1,243k) over Day Care – (322k) over 
Home Support – (918k) over
Adult and Older People –
(322k) over 
Adult and Older People –
(918k) over
This overspend relates to
slippage in the IJB Maximising
SDS Options – Day Services
saving for 2024/25. Additional
demand is also affecting this
overspend. 
The overspend relates to
slippage in the IJB Procurement
Reviews saving for 2024/25.
Additional demand is also
affecting this overspend.
Transfer
Payments
(567k) over Direct Assistance to Persons Kinship
Care – (556k) over
Children and Families –
(556k) over
This overspend relates to the
payment of kinship care
allowances, where demand is
increasing. 
Income (61k) under
recovered
Fees and Charges - General – (67k)
under recovered 
Adult and Older People –
(301k) under recovered 
Adult and Older People –
227k over recovered
The under recovery in income is
in relation to under occupancy
levels. 
This over recovery is non-
recurring and is due to the
recovery of prior year care costs
from service users.
81

Page 82

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Social Work Resources Summary Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
EMPLOYEE COSTS
ADMIN & CLERICAL STAFF - APT&C BASIC 5,801 0 5,800 1,302 5,160 640
ADMIN & CLERICAL STAFF - APT&C OVERTIME 0 0 0 50 176 (176)
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 367 0 367 83 307 60
ADMIN & CLERICAL STAFF - APT&C NIC 408 0 408 106 414 (6)
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 23,435 0 23,782 6,694 24,501 (719)
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 46 0 46 157 561 (515)
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 1,500 0 1,574 416 1,468 106
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 2,467 0 2,502 729 2,708 (206)
BASIC GRADE SOCIAL WORKERS BASIC 13,412 0 13,514 2,966 11,985 1,529
BASIC GRADE SOCIAL WORKERS OVERTIME 44 0 44 36 133 (89)
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 921 0 938 186 711 227
BASIC GRADE SOCIAL WORKERS NIC 1,428 0 1,439 320 1,262 177
HOSPITAL SOCIAL WORKERS BASIC 449 0 448 155 570 (122)
HOSPITAL SOCIAL WORKERS OVERTIME 0 0 0 1 1 (1)
HOSPITAL SOCIAL WORKERS SUPERANNUATION 29 0 29 9 35 (6)
HOSPITAL SOCIAL WORKERS NIC 46 0 46 17 63 (17)
INSTRUCTORS BASIC 1,512 0 1,511 337 1,278 233
INSTRUCTORS SUPERANNUATION 98 0 98 21 71 27
INSTRUCTORS NIC 136 0 136 30 115 21
CARE STAFF - APT&C BASIC 18,267 0 17,100 4,615 17,314 (214)
CARE STAFF - APT&C OVERTIME 745 0 547 185 1,110 (563)
CARE STAFF - APT&C SUPERANNUATION 1,181 0 1,097 288 965 132
CARE STAFF - APT&C NIC 1,815 0 1,687 448 1,666 21
HOME CARERS BASIC 28,132 0 28,857 6,762 27,418 1,439
HOME CARERS OVERTIME 1,907 0 1,181 255 1,425 (244)
HOME CARERS SUPERANNUATION 1,819 0 1,818 372 1,719 99
HOME CARERS NIC 2,846 0 2,846 670 2,613 233
TRAVEL AND SUBSISTENCE 0 0 0 1 0 0
OTHER EMPLOYEE COSTS 2,463 0 3,804 67 3,803 1
PENSION INCREASES 328 0 328 35 328 0
EMPLOYEE COSTS 111,602 0 111,947 27,313 109,880 2,067
PROPERTY COSTS
RATES 345 0 345 0 345 0
SCOTTISH WATER - UNMETERED CHARGES 35 0 35 0 35 0
SCOTTISH WATER - METERED CHARGES 166 0 166 21 166 0
RENT 523 0 523 154 523 0
PROPERTY INSURANCE 292 0 292 0 292 0
SECURITY COSTS 2 0 2 2 2 0
GROUND MAINTENANCE 3 0 3 0 3 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 2 0 2 6 2 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 63 0 63 16 64 (1)
ELECTRICITY  - CONTRACT 851 0 852 154 852 0
GAS 996 0 1,055 281 679 376
JANITOR SERVICE 0 0 0 1 0 0
CLEANING CONTRACT 385 0 381 363 381 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 283 0 223 21 224 (1)
HEALTH & HYGIENE MATERIALS 91 0 91 2 92 (1)
WINDOW CLEANING 11 0 11 2 11 0
REFUSE UPLIFT 43 0 43 4 43 0
REMOVAL & STORAGE COSTS 1 0 1 3 1 0
OTHER PROPERTY COSTS 194 0 180 77 180 0
PROPERTY COSTS 4,286 0 4,268 1,107 3,895 373
82

Page 83

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Social Work Resources Summary Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 921 0 763 361 763 0
COMPUTER EQUIPMENT MAINTENANCE 51 0 40 0 41 (1)
I.T. EQUIPMENT MAINT-CONTRACT 228 0 201 4 200 1
I.T. ELECTRONIC MESSAGING 258 0 122 0 122 0
EQUIPMENT, APPARATUS AND TOOLS 122 0 122 8 122 0
SMALL TOOLS 4 0 4 1 3 1
AIDS & ADAPTIONS 1,782 0 1,937 335 1,937 0
SUPPLIES FOR CLIENTS 353 0 362 72 364 (2)
FURNITURE - OFFICE 1 0 1 1 1 0
FURNISHINGS (INCL. CROCKERY & LINEN) 17 0 17 3 17 0
MATERIALS 10 0 10 0 10 0
MATERIALS, APPARATUS AND EQUIPMENT 1 0 1 4 1 0
PROVISIONS - GENERAL 213 0 213 54 213 0
FOOD PURCHASES WITHIN CONTRACT SERVICE 513 0 512 133 513 (1)
BEVERAGES 60 0 60 11 60 0
SCHOOL MILK 41 0 41 10 41 0
PROTECTIVE CLOTHING & UNIFORMS 1,355 0 1,298 474 1,337 (39)
LAUNDRY COSTS 4 0 4 5 4 0
OTHER SUPPLIES AND SERVICES 47 0 47 14 48 (1)
CATERING - CONTRACT 372 0 372 325 372 0
CATERING - OUTWITH CONTRACT 55 0 55 1 57 (2)
MAJOR SUPPLY OF ELECTRICAL POWER 0 0 0 0 0 0
DELIVERY CHARGE 0 0 0 1 0 0
I- PROCUREMENT ERRORS 0 0 0 2 0 0
SUPPLIES AND SERVICES 6,408 0 6,182 1,819 6,226 (44)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0
POOL CAR CHARGES-RENTAL 119 0 155 73 156 (1)
POOL CAR CHARGES-FUEL 39 0 19 0 20 (1)
POOL CAR CHARGES-ADDITIONAL COSTS 7 0 3 0 3 0
OTHER TRANSPORT COSTS 904 0 935 184 949 (14)
INSURANCE 24 0 24 0 24 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 3,120 0 3,124 182 3,753 (629)
HIRE OF EXTERNAL VEHICLES 7 0 7 0 7 0
HIRE OF EXTERNAL PLANT 0 0 0 0 0 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0
PUPIL TRANSPORT - STRATHCLYDE PASS 0 0 0 1 0 0
PUPIL TRANSPORT - OTHER 10 0 10 3 10 0
TRANSPORT AND PLANT 4,230 0 4,277 443 4,922 (645)
ADMINISTRATION
PRINTING AND STATIONERY 101 0 101 15 101 0
TELEPHONES 205 0 206 1 206 0
MOBILE PHONES 613 0 285 5 285 0
ADVERTISING - RECRUITMENT 4 0 4 0 4 0
ADVERTISING - OTHER 10 0 10 0 10 0
POSTAGES/COURIERS 53 0 52 12 53 (1)
MEMBERSHIP FEES/SUBSCRIPTIONS 53 0 52 15 53 (1)
INSURANCE 27 0 27 0 27 0
MEDICAL COSTS 26 0 26 17 35 (9)
LEGAL EXPENSES 298 0 298 30 298 0
HOSPITALITY / CIVIC RECOGNITION 6 0 5 0 5 0
OTHER ADMIN COSTS 55 0 54 10 55 (1)
CONFERENCES - OFFICIALS (incl associated costs) 7 0 6 0 7 (1)
TRAINING 44 0 44 2 44 0
INTERNAL SUPPORT SERVICES ALLOCATION 410 0 410 0 410 0
ADMINISTRATION 1,912 0 1,580 107 1,593 (13)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 55 0 55 0 55 0
OTHER LOCAL AUTHORITIES 25 0 25 0 25 0
GRANTS TO VOLUNTARY ORGANISATIONS 23 0 23 12 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 2,454 0 2,755 557 2,757 (2)
PAYMENTS TO OTHER BODIES 2,385 0 2,382 367 2,382 0
PAYMENTS TO HEALTH BOARD 1,508 0 1,509 108 1,508 1
PRIVATE INDIVIDUALS - GENERAL 1,107 0 1,101 209 1,103 (2)
SOCIAL WORK - FOSTER PARENTS 6,483 0 6,482 2,030 6,482 0
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 0 94 22 94 0
SOCIAL WORK - ADOPTION ALLOWANCES 650 0 650 403 750 (100)
DIRECT PAYMENTS 10,899 0 10,878 2,761 10,642 236
PAYMENT TO OTHER BODIES 25,683 0 25,954 6,469 25,821 133
83

Page 84

South Lanarkshire Council
Period 3 Period 3 Revised Period 4 Period 4 Period 4
Social Work Resources Summary Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) 24/25 Outturn)
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 6 0 0
26120-PAYMENT TO PRIVATE CONTRACTOR 0000-DEFAULT 374 0 1,177 63 1,177 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4010-MISC 35 0 0 0 0 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4014-PAYMENTS TO COL ORGS 73,216 0 73,645 17,795 73,645 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4015-CET ALLOCATION - HOME CARE 34,711 0 34,152 7,764 34,153 (1)
26120-PAYMENT TO PRIVATE CONTRACTOR 4032-SECURE ACCOMMODATION 584 0 584 297 584 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4045-RESPITE 1,978 0 2,046 177 2,048 (2)
26120-PAYMENT TO PRIVATE CONTRACTOR 4050-CARE COMMISSION COSTS 0 0 0 2 0 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4052-DAY CARE 1,088 0 1,088 233 1,410 (322)
26120-PAYMENT TO PRIVATE CONTRACTOR 4055-HOME SUPPORT 23,426 0 22,846 5,326 23,764 (918)
26120-PAYMENT TO PRIVATE CONTRACTOR 4056-EMPLOYMENT TRAINING 55 0 55 13 55 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4075-FREE PERSONAL NURSING CARE 9,135 0 9,135 1,024 9,135 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4134-C & F - OUT OF SCHOOL SERVICE 61 0 18 2 18 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4146-P.A. (COLLEGE) 253 0 253 58 253 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4170-GROUPWORK/SOCIAL SUPPORT 1,023 0 1,023 236 1,023 0
26120-PAYMENT TO PRIVATE CONTRACTOR 4171-CARER RESPITE 424 0 418 97 419 (1)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 115 0 116 24 115 1
PAYMENT TO CONTRACTORS 146,478 0 146,556 33,117 147,799 (1,243)
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 3,553 0 3,572 1,569 4,139 (567)
SECTION PAYMENTS 83 0 32 35 32 0
TRANSFER PAYMENTS 3,636 0 3,604 1,604 4,171 (567)
FINANCING CHARGES
LEASING CHARGES - FINANCE 1 0 1 0 1 0
I.T. EQUIPMENT LEASING-CONTRACT 395 0 395 11 395 0
FINANCING CHARGES 396 0 396 11 396 0
TOTAL EXPENDITURE 304,631 0 304,764 71,990 304,703 61
INCOME
NON RELEVANT GOVERNMENT GRANT (8,180) 0 (8,510) (2,041) (8,510) 0
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (25,085) 0 (25,039) (6,270) (25,039) 0
CONTRIBUTIONS FROM OTHER BODIES (1,619) 0 (1,619) (521) (1,619) 0
SALES - SALE OF MEALS (14) 0 (14) (9) (14) 0
FEES AND CHARGES - GENERAL (7,904) 0 (7,716) (2,574) (7,649) (67)
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (656) 0 (655) (31) (656) 1
CHARGES TO HEALTH BOARDS (26,334) 0 (26,334) (144) (26,334) 0
FEES AND CHARGES - OTHER BODIES 0 0 (4) 0 (4) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (218) 0 (217) 0 (221) 4
RENTAL INCOME (27) 0 (26) 0 (27) 1
OTHER INCOME (235) 0 (235) (44) (235) 0
REALLOCATION OF SUPPORT COSTS (400) 0 (400) 0 (400) 0
INCOME TOTAL (70,672) 0 (70,769) (11,634) (70,708) (61)
NET EXPENDITURE 233,959 0 233,995 60,356 233,995 0