Democracy Spraffa

Agenda Document Pack - Financial Resources Scrutiny Forum - 15/08/2024

South Lanarkshire Council · 15 August 2024
Back to Financial Resources Scrutiny Forum — 15 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 07 August 2024 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 15 August 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Grant Ferguson (Chair), Julia Marrs (Depute Chair), Mathew Buchanan, Colin Dewar, Ross
Gowland, Gavin Keatt, Richard Lockhart, Monique McAdams, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Financial Resources Scrutiny Forum held on 28
March 2024 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Monitoring 
3 Capital Budget Monitoring 2023/2024 - General Fund Capital Programme
Report dated 23 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
7 - 14 
4 Capital Budget Monitoring 2023/2024 - Housing Capital Programme
Report dated 23 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
15 - 20 
5 Capital Budget Monitoring 2024/2025 - General Fund Capital Programme
Report dated 25 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
21 - 44 
6 Capital Budget Monitoring 2024/2025 - Housing Capital Programme
Report dated 25 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
45 - 52 
7 Revenue Budget Monitoring 2023/2024
Report dated 25 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
53 - 64 
8 Revenue Budget Monitoring 2023/2024 - Detailed Resource Analysis
Report dated 25 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
65 - 142 
9 Revenue Budget Monitoring 2024/2025
Report dated 25 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
143 - 148 
10  Revenue Budget Monitoring 2024/2025 - Detailed Resource Analysis
Report dated 25 July 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
149 - 200 
Urgent Business 
11  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

FINANCIAL RESOURCES SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 28 March 2024 
Chair:
Councillor Grant Ferguson 
Councillors Present:
Councillor Colin Dewar, Councillor Ross Gowland, Councillor Gavin Keatt, Councillor Richard
Lockhart, Councillor Julia Marrs (Depute), Councillor Carol Nugent 
Councillors' Apologies:
Councillor Mathew Buchanan, Councillor Monique McAdams 
Attending:
Finance and Corporate Resources
J Taylor, Executive Director; E-A McGonigle, Administration Officer; A Norris, Administration
Assistant; L O’Hagan, Finance Manager (Strategy)
Housing and Technical Resources
D Craig, Property Manager (Commercial) 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Financial Resources Scrutiny Forum held on 29 February
2024 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3a Capital Budget Monitoring 2023/2024 – General Fund Capital Programme 
A report dated 11 March 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the General Fund Capital Programme 2023/2024 for the period
1 April 2023 to 26 January 2024. 
Following approval at the Executive Committee on 21 February 2024, there was a revised
General Fund Capital Programme for 2023/2024 totalling £78.296 million.  There were no
changes submitted to the Executive Committee on 20 March 2024, therefore, the revised budget
remained at £78.296 million. 
The revised programme was detailed in Appendix A to the report, with Resource budgets
detailed in Appendix B to the report.  Programmed funding for the year also totalled £78.296
million and the funding available to support the overall 2023/2024 Capital Programme was
detailed in Appendix C to the report. 
Current estimates from Resources suggested an outturn of around £72 million.  Against the
revised budget of £78.296 million, the outturn position meant a net underspend of £6.3 million. 
This comprised project underspends totalling £8.5 million offset by projects with greater than
anticipated spend of £2.2 million.  The majority of the variance was due to the timing of spend, 
2
3

Page 4

resulting in budget required in 2024/2025 rather than 2023/2024.  Funding for projects remaining
underspent at the financial year-end would be carried forward to allow the projects to be
completed in 2024/2025.  Details of the underspent projects, which were scheduled for
completion in 2024/2025, were listed in Appendix D of the report. 
Budget for the period was £37.171 million and spend to 26 January 2024 was £36.695 million,
an underspend of £0.476 million, which mainly reflected the timing of spend on a number of
projects.  Actual funding received to 26 January 2024 was £66.450 million, as detailed in
Appendix C to the report. 
The physical progress achieved with the General Fund Capital Programme 2023/2024 at 26
January 2024 was detailed in appendices E to G to the report. 
The Forum decided: that the position on the General Fund Capital Programme
as at 26 January 2024 be noted. 
[Reference: Minutes of 29 February 2024 (Paragraph 3a) and Minutes of the Executive
Committee of 21 February 2024 (Paragraph 4) and 20 March 2024 (Paragraph 4)] 
3b Capital Budget Monitoring 2023/2024 – Housing Capital Programme 
A report dated 11 March 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the Housing Capital Programme 2023/2024 for the period 1
April 2023 to 26 January 2024 (Period 11). 
The revised Housing Capital Programme for 2023/2024 totalled £67.443 million, as approved by
the Executive Committee on 21 February 2024.  Programmed funding for the year was £67.443
million. 
Budget for the period was £43.225 million and spend to 26 January 2024 was £45.478 million,
which represented an overspend of £2.253 million, as detailed in Appendix A to the report.  The
overspend reflected the number of buy backs, through the open market purchase scheme,
which had been progressed earlier than anticipated.  Actual funding received at 26 January
2024 was £45.478 million. 
Current estimates from Housing and Technical Resources suggested an outturn of £67.443
million.  Progress on the Housing Capital Programme would continue to be monitored and
updates provided to future meetings of the Forum. 
The physical progress achieved with the Housing Capital Programme 2023/2024 at 26 January
2024 was detailed in Appendix B to the report. 
The Forum decided: that the position on the Housing Capital Programme as at
26 January 2024 be noted. 
[Reference: Minutes of 29 February 2024 (Paragraph 3b) and Minutes of the Executive
Committee of 21 February 2024 (Paragraph 4) and 20 March 2024 (Paragraph 4)] 
4 Revenue Budget Monitoring 2023/2024 
A report dated 1 March 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April 2023 to 26 January 2024 (Period 11), along
with a projection for the year to 31 March 2024.
4

Page 5

The report and associated appendices:- 
 summarised the previously reported probable outturn position for the Council’s General
Fund Revenue Account to 31 March 2024
 provided details on the probable outturn position for the Housing Revenue Account to 31
March 2024
 provided details of the position of the General Fund Revenue Account and the Housing
Revenue Account respectively to 26 January 2024 
The outturn position for the General Fund, after transfers to reserves totalling £14.985 million,
resulted in an underspend of £9.000 million.  It was proposed that the £9.000 million probable
outturn underspend be transferred to Reserves with £3.000 million being set aside to support
budget pressures in 2024/2025 and the remaining £6.000 million being considered to support
the Council’s Budget Strategy.   
Full details of the Transfers to Reserves had been reported to the meeting of the Executive
Committee held on 24 January 2024.  The forecast position before and after Transfers to
Reserves was detailed in appendices 1 and 2 to the report.  Appendix 2 included the probable
outturn underspend of £9.000 million as a Transfer to Reserves, resulting in a breakeven
position for the Council’s 2023/2024 probable outturn. 
As previously reported to the Forum, the Cabinet Secretary had held back funding nationally for
the maintenance of teacher numbers until after the 2023 Census details had been received, and
until councils could provide assurance that they had maintained teacher numbers and pupil
support numbers at the 2022 level.  For the Council, this amounted to £2.934 million of funding
and those funds had now been released as part of the Local Government Finance Order that
was issued on 29 February 2024.   
At 26 January 2024, the position on the General Fund Revenue Account, after transfers to
reserves, was an underspend of £2.617 million.  The underspend of £2.617 million to date
differed from the breakeven Probable Outturn position because the net underspend on council
tax of £3.6262 million and the 2023/2024 Probable Outturn underspend to be Transferred to
Reserves of £9.000 million, had not been included in the position to date.  Those variances
would materialise at the financial year-end. 
At 26 January 2024, the Housing Revenue Account showed a breakeven position, as detailed in
Appendix 3 to the report, and the forecast to 31 March 2024 on the Housing Revenue Account
was also a breakeven position.  This breakeven position included a lower than budgeted
Transfer for Reserves being required in the financial year.  It was assumed that the increased
level of costs experienced would be offset by an underspend in Loan Charges this financial
year. 
The reduction in Loan Charges was anticipated in 2023/2024 as a result of using an in-year
benefit from the Housing Revenue Account Loans Fund Review.  The Loans Fund Review was
detailed in the 2024/2025 budget setting report for the Housing Revenue Account which was
approved by members at the Council meeting held on 21 February 2024. 
The Executive Director (Finance and Corporate Resources) responded to members’ questions
in relation to:- 
 the position in terms of the release of funding from the Scottish Government for the
maintenance of teacher numbers in 2024/2025
 the figures detailed in the annual forecast before transfers to reserves for Leisure and
Culture Services and for Loan Charges
5

Page 6

The Forum decided: 
(1) that the Council’s breakeven probable outturn position after Transfers to Reserves, as
detailed in section 4.1 of the report, be noted; 
(2) that the underspend of £2.617 million on the General Fund Revenue Account at 26
January 2024, as detailed in section 5.1 of the report, be noted; and 
(3) that the breakeven position on the Housing Revenue Account at 26 January 2024, and the
forecast to 31 March 2024 of breakeven, as detailed in sections 6.1 and 6.2 of the report,
be noted. 
[Reference: Minutes of 29 February 2024 (Paragraph 4), Minutes of the Executive Committee of
24 January 2024 (Paragraph 3) and 20 March 2024 (Paragraph 3) and Minutes of
South Lanarkshire Council of 21 February 2024 (Paragraph 3)] 
5 Revenue Budget Monitoring 2023/2024 – Detailed Resource Analysis 
A report dated 1 March 2024 by the Executive Director (Finance and Corporate Resources) was
submitted comparing actual expenditure against budgeted expenditure for the period 1 April
2023 to 26 January 2024 (Period 11). 
Appendices A to F to the report provided the following information for each Resource and the
Housing Revenue Account:- 
 an Executive Summary showing the top-level position for each of the Services within the
Resource and the Housing Revenue Account as at 26 January 2024
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services as at 26 January 2024
 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings as at 26 January 2024 
Officers responded to a member’s questions in relation to:- 
 the overspend on pupil transport reported in the Education Resources’ Variance Analysis
in Appendix B to the report
 the overspend reported under Property Costs for bed and breakfast in the Housing and
Technical Resources’ Variance Analysis in Appendix D to the report 
Where information was not immediately available, the Executive Director (Finance and
Corporate Resources) undertook to provide this to the relevant member. 
The Forum decided: that the position as at 26 January 2024 (Period 11) be
noted. 
[Reference:  Minutes of 29 February 2024 (Paragraph 5)] 
6 Urgent Business 
There were no items of urgent business.
6

Page 7

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2023/2024 - General Fund
Capital Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum on the final outturn
position of the Council’s General Fund Capital Programme for the period covering
1 April 2023 to 31 March 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the final outturn position on the 2023/2024 General Fund Capital
Programme be noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 31 March 2024 from
a financial perspective. 
3.2. Appendix A shows the financial position of the General Fund Capital Programme. 
Any physical progress update for projects carried forward into financial year 2024/25
will be picked up as part of the new year monitoring report. 
4. General Fund Capital Programme 2023/2024
4.1. The General Services Capital Programme for 2023/2024 totalled £78.365 million. 
This revised programme consisted of the base budget plus carry forward projects
and adjustments which have been agreed by the Executive Committee up to and
including its meeting on 8 May 2024.   
4.2. The total expenditure on the General Services Capital Programme of £64.244 million
is shown in Appendix A.  This is compared to the budget of £78.365 million and
results in an underspend of £14.121 million.  This underspend relates to projects
within Community and Enterprise Resources (£11.241m), Finance and Corporate
Resources (£0.684m) and Housing and Technical Resources (£3.771m) with greater
spend than anticipated achieved within Education Resources (£1.257m) and Social
Work Resources (£0.318m). 
4.3. Overall, the programme underspend reflects the timing of spend across financial
years. The main projects responsible for the overall programme underspend of
£14.121 million are detailed in Appendix B.  This appendix provides a list of the
continuing projects into 2024/2025, along with their estimated completion dates.
3
7

Page 8

4.4. Year End and Accounting Adjustments:  Accounting Regulations mean that
adjustments are required to report spend correctly as either Capital or Revenue for
the purposes of publishing our Annual Accounts.  This includes where spend from
the Capital Programme is on assets that are not owned by the Council (for example
Shawfield Industrial Estate spend) or where spend must be classed as Revenue due
to the nature of the spend.  This adjustment has no physical impact on projects – it is
an accounting entry only. 
4.5. From reviewing the Council’s Revenue and Capital spend, £6.311 million of capital
spend is required to be recorded as Revenue spend. Conversely, £0.161 million of
revenue spend should be recorded as Capital. These transfers mean that for the
purpose of publishing our Annual Accounts only, there is capital spend of £58.094
million.  The funding sources for this spend are detailed in Appendix A. 
4.6. 2023/2024 Pay Award:  Part of the Council’s Capital funding package for the year
included £7.116 million which was allocated by the Scottish Government to fund the
2023/2024 Pay Award.  In order to facilitate this, the General Capital Grant has been
routed through the Housing Accounts with a subsequent transfer to the General
Services Revenue Account.  This is permitted in the Grant Conditions of the General
Capital Grant letter for 2023/2024 which the Scottish Government have changed for
this year only, and which allows councils to use the General Capital Grant for
Revenue spend. 
4.7. Carry Forward to 2024/2025:  As noted in 4.2, the year-end underspend is £14.121
million.  This £14.121 million will carry forward into financial year 2024/2025. 
4.8. The overall base programme for 2024/2025 including this carry forward of £14.121
million will be included in a further report to this meeting.  This separate report
reviews the programme for the coming year detailing the overall level of spend
achievable. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are included in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report.
8

Page 9

Jackie Taylor
Executive Director of Finance (Strategy) 
23 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 8 May 2024
 Executive Committee, 26 June 2024 
List of Background Papers
 Capital Ledger prints to 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk 
9

Page 10

APPENDIX A
(Page 1)
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 31 MARCH 2024 
Resource Name 
Annual
Budget
£000 
2022/23
C/F
£000
Previous
Slippage
/Adjs
£000
Total
Original
Budget
£000 
Approved
Adjs
£000 
Approved
Slippage
£000 
Total
Budget
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
2,286 1,336 (860) 2,762 545 0 3,307 1,829
Planning & Reg  0 0 0 0 0 0 0 0
Enterprise /   Sust
Dev
29,824 5,035 (25,174) 9,685 2,559 (2,265) 9,979 5,211
Roads, Tport &
Fleet
20,118 5,749 (104) 25,763 9,431 (3,303) 31,891 26,896
Resource Total 52,228 12,120 (26,138) 38,210 12,535 (5,568) 45,177 33,936         
Education
Growth/Accom
Pressures
7,338 (1,218) 571 6,691 594 (192) 7,093 9,952
1,140 Hours 3,145 135 - 3,280 - - 3,280 2,539
ICT
Developments
2,444     (409) - 2,035 - - 2,055 2,016
Free School
Meals
6,642 69 (40) 6,671 (4,996) - 1,675 865
Inspiring Spaces
Programme - - - - 234 - 234 222
Resource Total 19,569 (1,423) 531 18,677 (4,148) (192) 14,337 15,594         
Finance & Corporate
IT Services 7,230 (1,283) (614) 5,333 0 0 5,333 4,649
Resource Total 7,230 (1,283) (614) 5,333 0 0 5,333 4,649         
Housing and Technical
Office Accom 7,250 3,295 91 10,636 299 0 10,935 7,548
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 (1,000) 0 - -
Other Housing 0 258 (95) 163 390 0 553 169
Resource Total 8,250 3,553 (4) 11,799 (311) 0 11,488 7,717         
Social Work
Other 1,984 (307) 353 2,030 0 0 2,030 2,348
Resource Total 1,984 (307) 353 2,030 0 0 2,030 2,348         
Other Match
Funding
1,800 - - 1,800 - (1,800) - - 
Overall Total 91,061 12,660 (25,872) 77,849 8,076 (7,560) 78,365 64,244 
10

Page 11

APPENDIX A
(Page 2)
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
Expenditure
2023/2024
Revised
Budget
2023/2024
Actual to
31/03/24  
£m £m   
General Fund Programme (Section 5.1) 78.365 64.244
Accounting Adjustments (Sections 5.4 and 5.5):     
Less:  Transfers to Revenue  (6.311)   
Add:  Year End Transfers to Capital  0.161   
2023/2024 Outturn Position (Accounting Basis only) 78.365 58.094   
Income 
2023/2024
Actual to
31/03/24  
£m
Prudential Borrowing  18.919
Developer Contributions  3.071
Partners (Including SPT, REF, Clyde Wind Farm and Energy
Saving Trust) 
2.966
Scottish Government:   
- Capital Grant (excl. £7.116m transferred to HRA)  22.900 
- Cycling, Walking and Safer Routes  2.283 
- Vacant and Derelict Land  0.032 
- Regeneration Capital Grant   - 
- Place Based Investment Programme  1.536 
- Inspiring Spaces  0.223 
- Road Safety Improvement Fun  0.440
Glasgow City Region City Deal  3.995
Specific Reserves  1.153
Revenue Contribution  0.576   
TOTAL FUNDING  58.094   
11

Page 12

APPENDIX B
(Page 1)
SOUTH LANARKSHIRE COUNCIL      
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
Projects with Underspends in 2023/2024 
which will Carry Forward into 2024/2025
Project Name Project Type Completion Date     
Community and Enterprise Resources  
SLLC – Booking and Admission System IT Infrastructure March 2025
Phillipshill Cemetery – Extension Infrastructure  June 2024
Ash Die Back Woodland
Management
September 2024 
Langlands Boardwalk Infrastructure January 2025
Bin Storage Areas Infrastructure September 2024
Play Parks – Larkhall, Rutherglen and
Cambuslang Areas
Infrastructure October 2024
Nature Restoration Fund Woodland
Management
July 2025
Greenhall Replacement Bridge – Design  Infrastructure June 2025
White Bridge Replacement, Chatelherault
Country Park – Design 
Infrastructure June 2024
Larkhall Leisure Centre – Design New Build March 2025
Former Ballgreen Hall Demolition Demolition June 2024
TACT Hall - Heating Replacement Refurbishment June 2024
Priory Changing Pavilion, Blantyre Refurbishment March 2025
Calderglen Country Park – One Way System &
Infrastructure
Infrastructure July 2024
Rural Development Centre – Lanark Racecourse Regeneration November 2024
2023/2024 Place Based Investment Fund –
Various 
Regeneration September 2024
SLC Industrial Infrastructure - Energy Efficiency Regeneration June 2025
Carnwath Community and Business Enterprise
HUB
Regeneration March 2025
Carluke High Mill Community Facility Regeneration March 2026
Vacant & Derelict Land – Cuningar Allotments Regeneration September 2024 
Vacant & Derelict Land – Clyde Cycle Park
Phase 2
Regeneration August 2024
City Deal Community Growth Areas – Woodfoot
Road / Wellhall Road, Hamilton
Infrastructure March 2025
City Deal – Calderside Academy Adaptations Autumn 2026
City Deal – Holy Cross High Adaptations Autumn 2026
City Deal – Lanark Road Signalisation Infrastructure August 2024
City Deal – Cathkin Bypass – Grant Payments
Only
Grants Throughout 2024/25 
12

Page 13

APPENDIX B
(Page 2)
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/2024
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
Projects with Underspends in 2023/2024 
which will Carry Forward into 2024/2025
Project Name Project Type Completion Date
Community and Enterprise Resources (Cont)  
City Deal – Greenhills Road - Landscaping etc Infrastructure August 2024
Roads Investment Programme - Clydesdale Infrastructure December 2024
Roads Structures Infrastructure August 2024
Footpaths and Roads Improvement Fund Infrastructure December 2024
Cycle Shelters at Schools Infrastructure September 2024
Lanark Interchange Infrastructure Ongoing discussions 
on funding
Electric Vehicle Expansion Infrastructure March 2025
Switched on Fleet Infrastructure March 2025
National Strategy for 20mph Infrastructure March 2025 
Education Resources  
Woodside Primary School - Adaptations Adaptations August 2024
Uddingston Nursery Expansion Adaptations August 2024
Crawforddyke Primary School - Toilet Adaptations Adaptations April 2024
Stonelaw High School - Adaptations Adaptations Summer 2024
Wooddean Early Learning Centre (formerly Clyde
Terrace Nursery)  
New Build April 2024
First Steps Community Nursery Extension June 2024
Free School Meals Expansion Adaptations Throughout 2024/25
and beyond
Secondary Schools – St. Andrews and St. Brides Adaptations Throughout 2024/25
and beyond
Schools ICT Infrastructure Throughout 2024/25
and beyond   
Finance and Corporate Resources  
IT Infrastructure Refresh Infrastructure Throughout 2024/2025
Oracle Fusion Infrastructure August 2024   
Housing and Technical Resources   
Prioritised Urgent Investment Refurbishment Throughout 2024/25
Lifecycle Replacement Schools Refurbishment Throughout 2024/25
Communities Facilities Fund Refurbishment Throughout 2024/25
Council Offices – Brandon Gate  Adaptations April 2024
CEEF Programme Refurbishment June 2024
Public Space CCTV – Phase 2 Infrastructure March 2025   
Social Work Resources  
SWIS Plus Replacement IT
Infrastructure
October 2024         
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2023/2024 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum on the final outturn
position of the Council’s Housing Capital Programme for the period covering 1 April
2023 to 31 March 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the final outturn position on the 2023/2024 Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 31 March 2024 from a
financial perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, which was
reported to the Executive Committee on 26 June 2024.  Any physical progress update
for projects carried forward into financial year 2024/2025 will be picked up as part of the
new year monitoring report. 
4. Housing Capital Programme Final Outturn Position 2023/2024 
4.1. The revised Housing Capital Programme for 2023/2024 totalled £67.443 million. This
revised programme was approved by Executive Committee on 8 May 2024. 
4.2. Appendix A shows actual expenditure of £62.240 million which is £5.203 million less
than the budget of £67.443 million.  This is due to the timing of the purchase of land at
sites within the East Kilbride Community Growth Area and Brackenhill Farm, Hamilton,
with these settling early in the new financial year.  In addition, there were access issues
with a significant number of central heating systems upgrades and windows and doors
projects. 
4.3. Taking into account the year-end underspend position, means a carry forward of £5.203
million which will fall into future financial years.  Further analysis of this budget confirms
that £3.418 million is required in 2024/25, with the remainder being carried forward into
future years. 
4
15

Page 16

4.4. In addition, the Scottish Government’s Affordable Housing grant for 2024/2025 has now
been confirmed. For South Lanarkshire, this will result in a reduction of £3.473 million in
the 2024/2025 approved programme.   
4.5. The adjustments noted at Sections 4.3 and 4.4 were added into the Capital Programme
as part of the new year monitoring report. 
4.6. 2023/2024 Pay Award:  Part of the Council’s Capital funding package for the year
included £7.116 million which was allocated by the Scottish Government to fund the
2023/2024 Pay Award.  In order to facilitate this, the General Capital Grant has been
routed through the Housing Accounts with a subsequent transfer to the General
Services Revenue Account.  This is permitted in the Grant Conditions of the General
Capital Grant letter for 2023/2024 which the Scottish Government have changed for this
year only, and which allows councils to use the General Capital Grant for Revenue
spend. 
4.7. The figures presented in Appendix A reflect the transfer of General Capital Grant and
the reduced use of CFCR to facilitate the funding ultimately being transferred to the
General Services Revenue account to pay for the Pay Award.  This has no impact
bottom-line and is just the accounting arrangements required for routing the monies to
the General Services Revenue account. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications 
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
16

Page 17

Previous References
 Executive Committee, 8 May 2024
 Executive Committee, 26 June 2024 
List of Background Papers 
 Capital Ledger prints to 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk 
17

Page 18

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/2024
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
2023/2024
Annual Budget 
2023/2024
Actual to
31/03/24 
£m  £m
EXPENDITURE   
2023/2024 Budget 
Incl. carry forward from 2023/24
67.443  62.240 
2023/2024
Actual to
31/03/24  
£m
INCOME     
Capital Receipts  1.901
Capital Receipts – Land Sales  0.065
Capital Funded from Current Revenue (after transfer to General Services Revenue)  20.046
Prudential Borrowing  14.533
General Capital Grant (being the transfer from General Services Capital)  7.116
Scottish Government Specific Grant:
– New Build   9.228
– Open Market Purchase Scheme  8.563
– Mortgage to Rent  0.288
Miscellaneous Income  0.500
TOTAL FUNDING  62.240 
18

Page 19

4
19

Page 20

20

Page 21

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)
Subject: Capital Budget Monitoring 2024/2025 - General Fund
Capital Programme
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2024
to 14 June 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the 2024/2025 General Fund
Capital Programme be noted.
[1recs]
3. Background
3.1. South Lanarkshire Council (21 February 2024) approved a General Services base
budget of £49.512 million for financial year 2024/2025.  Since the approval of this
programme, the financial year-end and additional funding received will mean an
adjustment to the 2024/2025 Capital Programme set.  This is detailed in section 4.1.
3.2. The Capital reports attached provide detail on the position as at 14 June 2024 from
both a financial and physical perspective.
3.3. Appendices A to D show the financial position of the General Fund Capital
Programme, with the physical progress detailed in appendices E to G – as they are
split into Build, Non-Build and Roads.
4. General Fund Capital Programme 2024/2025
4.1. 2024/25 Budget:  Section 3.1 notes that the programme for the General Fund was
£49.512 million, as approved by Council in February 2024.  A number of adjustments
to the programme have been required to reflect budget carried forward from financial
year 2023/2024, along with additional funding received in 2023/2024.  The
adjustments also reflect the anticipated spend which can realistically be achieved in
2024/2025.  In total, these adjustments amount to a net increase of £24.338 million
and result in a base budget for 2024/2025 of £73.850 million.  A full list of these
adjustments is included in Appendix A.    
5
21

Page 22

4.2. During financial year 2024/2025, Resources have advised of adjustments required to
the programme.  The revised programme for the year totals £85.248 million and
includes adjustments to the programme totalling a net increase of £11.398 million. 
These adjustments were approved by the Executive Committee on 26 June 2024
and 7 August 2024 and are detailed in appendices B and C respectively.  The
increase mainly reflects additional funding from external bodies which are required to
be spent on specific programmes of work.    
4.3. The funding available to support the programme also totals £85.248 million and is
detailed in Appendix D (Page 3).
4.4. 2024/2025 Forecast:  In line with our move to the new Fusion IT system, the focus
of capital monitoring will now be the forecast spend position for the financial year.
This will routinely be compared to the annual budget and will mean that Resources
will have early warning of any in-year project overspends or slippage, and will allow
corrective action to be taken, when possible, either to bring spend back in on line, or
to accelerate another approved project so that maximum spend can be incurred in
year.   
4.5. The programme spend and funding for the General Fund is summarised in Appendix
D. As noted in 4.2, the total capital spending programme for the year is £85.248
million.
4.6. Appendix D also shows a forecast for the financial year of £85.248 million.
4.7. 2024/2025 Actual Position:  Actual spend incurred to the 14 June 2024 totals
£5.131 million.
4.8. Actual funding received to 14 June 2024 is £43.214 million.
4.9. Relevant officers will continue to closely monitor the generation of all income
including receipts.
5. Employee Implications
5.1. There are no employee implications as a result of this report.
6. Financial Implications
6.1. The financial implications are included in section 4 of this report.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings.
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
22

Page 23

9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report.
Jackie Taylor
Executive Director of Finance (Strategy)
25 July 2024
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
Previous References
 South Lanarkshire Council, 21 February 2024
 Executive Committee, 26 June 2024
 Executive Committee, 7 August 2024
List of Background Papers
 Capital Ledger prints to 14 June 2024
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
23

Page 24

APPENDIX A
(Page 1)
2024/2025 General Services Base Budget Position – Required Adjustments
General Fund – 2024/25 Budget:  As noted at Section 3.1 of this report, the base programme
for the General Fund is £49.512 million, as approved by Council in February 2024.  This has
been updated to reflect the adjustments detailed in sections 1.1 to 1.9 below and summarised
in Table 1.
1.1. 2023/24 Carry Forward:  As reported in the Final Outturn Report for 2023/2024, a
separate report to this meeting, a carry forward total of £14.121 million will ensure
sufficient budget is available to conclude ongoing projects within the General Fund
Capital Programme.
Increase to Budget:  £14.121 million
1.2. Net Additional Funding (2023/2024):  At the end of 2023/2024, additional funding was
received and used to fund expenditure incurred in that year.  This has been offset by
budget reductions – where externally funded projects have completed under budget, or
funding is unable to be carried forward e.g. SPT funded projects such as Lanark
Interchange.  The net total of this income is an increase to the programme of £0.217
million and this needs to be added to the overall expenditure budget being carried into
2024/2025.  
Increase to Budget:  £0.217 million
1.3. Previous Approvals:  The Finance and Corporate Resources Committee, at its
meeting on the 1 September 2021, approved funding of £1 million from Reserves
towards the Oracle HR/Finance Replacement project.  The spend profile means that
this will be required in financial year 2024/2025.  
Increase to Budget: £1.000 million
1.4. Leisure and Culture Transformation Fund:  As part of the 2023/2024 Revenue
Budget, members approved an allocation of £1.182 million to pay for the cost of
borrowing £13 million of capital investment for a Leisure and Culture Transformation
Fund.  The fund will help modernise the leisure and culture estate, optimise use of
assets and assist in the transition towards net zero.
1.5. The Council’s Executive Committee (8 May 2024) approved the first phase of
investment from this Fund totalling around £8.4 million.  The 2024/2025 programme will
be increased to facilitate spend on these projects.  
Increase to Budget:  £8.400 million
1.6. General Capital Grant: In May 2024, the Scottish Government revised our 2024/2025
General Capital Grant allocation to £20.156 million.  This is an increase of £0.880
million and reflects the distribution of the previously expected 2024/2025 Renewal of
Play Parks allocation of £0.896 million.  However, as there is already a allocation of
£1.109 million in the 2024/2025 Programme for Play Parks reflecting funding carried
forward, no increase to the current year programme is proposed at this stage. This will
be added to the 2025/2026 Capital Programme.  Should the funds be required in
2024/2025, the budget will be adjusted accordingly.     
No impact on Budget
24

Page 25

APPENDIX A
(Page 2)
1.7. Hairmyres Station Park and Ride:  The estimated cost of completing the new park
and ride facility at Hairmyres Station is £4.6 million, funded from Glasgow City Region
City Deal (£2.000m) and Developer Contributions from the East Kilbride Community
Growth Area (£0.600m).  The balance of £2 million was originally anticipated from
Strathclyde Passenger Transport (SPT) however due to funding reductions to their
2024/2025 budget, this was not added to the original programme.  
1.8. Following extensive discussions, Transport Scotland have agreed to provide a letter of
comfort stating that they will reimburse the Council in future financial years, if the
Council agree to forward fund the £2 million shortfall in funding (through additional
borrowing) to allow the project to progress.  This letter of comfort is being finalised
through Transport Scotland / SLC discussions before final sign off.  Based on this letter
of comfort, it is proposed that the Council borrows on a short-term basis, to fund the
balance of the project spend (£2 million).  This borrowing will be repaid when the
funding is received from Transport Scotland.  Because the money from Transport
Scotland is a future funding stream, the Council is not liable to make any principal
repayments on this borrowing until the income is received.  The Council will however be
liable for interest on the outstanding amount until such times as the balance is repaid. 
This is estimated at £0.090 million per annum.  It is expected that Transport Scotland
will provide the funding by 2026/2027.  
1.9. The 2024/2025 Capital Programme includes an allocation of £1.979 million for this
project, funded by City Deal.  It is proposed that the budget be increased by a further
£2.6 million to include the additional borrowing (£2 million) as outlined at section 4.10,
as well as the developer contributions (£0.600 million).  However, because of the
anticipated profile of spend, the additional borrowing will be slipped into 2025/2026. 
When the results of the tender exercise and a programme of works is known, this may
be reprofiled. 
Increase to Budget:  £2.6 million
Slippage: (£2.0 million)
25

Page 26

APPENDIX A
(Page 2)
1.10. 2024/2025 General Services Base Budget Position:  Taking into account the
movements noted in sections 1.1 to 1.9, the General Services Programme for
2024/2025 is now £73.850 million.  This is the base budget for the financial year.  This
is summarised in Table 1.
Table 1 – 2024/2025 General Services Base Budget
2024/25
£m
Approved Programme – 21 February 2024 (Report - Section 3.1) 49.512
2023/24 Carry Forward (App A Page 1 - Section 1.1) 14.121
Net Additional Funding (2023/2024) (App A Page 1 - Section 1.2) 0.217
Previous Approvals (App A Page 1 - Section 1.3) 1.000
Leisure and Culture Transformation Fund (App A Page 1 - Section 1.4 – 1.5) 8.400
Hairmyres Station Park and Ride (App A Page 1 - Section 1.7 – 1.9) 0.600
2023/2024 General Services Base Budget 73.850
26

Page 27

Appendix B
(Page 1)
Adjustments Approved by Executive Committee – 26 June 2024
Community and Enterprise Resources
Three Rivers / Clydesdale Way
The Three Rivers/Clydesdale Way project, which is being led by Dumfries and
Galloway Council, is progressing well.  Based on the most recent projections, £2
million will be spent in financial year 2024/2025, with the balance of £5.550 million
required in 2025/2026.
Approval is therefore sought to increase the 2024/2025 Capital Programme by £2
million.  This will be funded from the Levelling Up Funding (total £6.795 million).  The
remaining £4.795 million will be required in financial year 2025/2026 along with the
Council’s match funding contribution of £0.755 million.  This contribution was
approved by the Council previously and moved to financial year 2025/2026 as part
of the 2024/2025 Capital Programme Update (February 2024).
£2.000m
Shawfield Remediation and Development
Levelling Up Funding totalling £14.638 million was also awarded to the Shawfield
Remediation and Development project, which is being led by Clyde Gateway Urban
Regeneration Company (URC). This funding will be paid directly to South
Lanarkshire on the basis of biannual claims, which will then be released to Clyde
Gateway. Due to the scale of this project, it is considered appropriate to include this
significant project in the Capital Programme for monitoring purposes. Both the spend
and funding will be transferred to revenue at the end of the financial year, to comply
with accounting guidelines.
Based on the most recent spend profile received from Clyde Gateway URC, £5.4
million of expenditure will be incurred up to the end of this financial year, with the
remaining £9.238 million in 2025/2026.   Approval is sought to increase the
2024/2025 Capital Programme by £5.400 million.   
£5.400m
Active Travel Infrastructure Fund (previously Cycling Walking and Safer Routes)
The Active Travel Infrastructure grant allocation from the Scottish Government for
2024/2025 has now been confirmed as £2.122 million.  This is an increase of £0.682
million from the funding advised previously and included in the 2024/2025 Capital
Programme (Cycling, Walking and Safer Routes £1.440 million – approved 21
February 2024).  This will be used to deliver active travel interventions that enhance
safety and accessibility of existing infrastructure or introduce new provision to travel
safely and more conveniently.   Projects include new controlled junctions / crossings
to facilitate active travel to a public transport interchange, road safety schemes
which also enhance active travel and new walking and cycling infrastructure. 
£0.682m
27

Page 28

Appendix B
(Page 2)
Housing and Technical Resources
Central Energy Efficiency Fund (CEEF)
The CEEF is a revolving fund. The fund is used to pay for energy efficiency projects
each financial year.  The fund is then replenished by savings achieved from these
projects across an agreed payback period for each project.  A new wave of projects
is included in the capital programme each financial year.   
Approval is sought to add energy efficiency projects totalling £0.700 million into the
2024/25 Capital Programme.  Projects to be carried out include the installation of
photovoltaic panels at a number of primary schools (£0.505 million) along with the
Fleet Services Depot (Vista Point), Blantyre (£0.157 million).  
Furthermore, an additional funding bid of £0.152 million has been submitted to the
Scottish Power Energy Networks Transmission Net Zero Fund for a PV installation
at Rigside Hall. The Council will be required to contribute 20% match funding,
therefore an allocation of £0.038 million has also been included in the 2024/2025
programme, subject to the bid being successful.   These works will be funded from
the CEEF Fund (£0.200 million) along with an additional one-off contribution from
reserves of £0.500 million which was approved as an amendment to the 2024/2025
Council Revenue budget.  
£0.700m
Minor Adjustments £0.008m
TOTAL ADJUSTMENTS £8.790m
28

Page 29

APPENDIX C
(Page 1)
Adjustments Approved by Executive Committee – 7 August 2024
Community and Enterprise Resources
Roads Carriageways and Associated Infrastructure
The amendments approved as part of the 2024/2025 Council Revenue Budget
included an additional allocation of permanent revenue budget to fund borrowing
and facilitate £7.2 million of capital investment in roads.
The Roads Service has now confirmed that they plan to utilise £1.8 million per
annum over the next 4 years.  Approval is sought to increase the 2024/2025
Capital Programme by £1.8 million to allow this additional investment to
progress.   
Education Resources
Kirkstyles ELCC Centre – Playground Improvements
Developer contributions have been identified to fund hardstanding and drainage
improvements to Nursey Centre playgrounds and improve the condition of the
external play area and facilities.  
Approval is sought to increase the 2024/2025 Capital Programme by £0.035m to
fund these improvements using Developer Contributions. 
£1.800m
£0.035m
Education Growth and Capacities
A grant funding allocation of £1.2 million has been received from Salix’s Public
Sector Heat Decarbonisation Fund to contribute towards retrofitting the heating
system at Our Lady of Lourdes Primary School, East Kilbride. As £0.427 million
of this award was already included in the original funding package for the
project, this is an additional funding award of £0.773 million for the capital
programme.  
The Growth and Capacities programme of works has incurred increased costs in
relation to the new Jackton Primary School, East Kilbride, as the project incurred
higher costs due to building control requirements, extension of time needed and
other necessary programme changes during construction resulting in higher
costs.  Taking account of the additional funding allocation of £0.773 million, the
overall costs of this programme of works can be managed within the funding
available.  
£0.773m
Minor Adjustments £0.000m
TOTAL ADJUSTMENTS £2.608m
29

Page 30

APPENDIX D
(Page 1)
SOUTH LANARKSHIRE COUNCIL
CAPITAL EXPENDITURE 2024/25
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 14 JUNE 2024
£m
Total Base Budget (including carry forward from 2023/2024) 73.850
Adjustments – Executive Committee, 26 June 2024 (Appendix B) 8.790
Adjustments – Executive Committee, 7 August 2024 (Appendix C) 2.608
2024/25 Total Revised Budget 85.248
2024/25
Budget
Period 2
Proposed
Adjustments
Period 3
Proposed
Adjustments
Revised
2024/25
Budget
Resource £m £m £m £m
Community & Enterprise 50.574 8.090 1.800 60.464
Education 8.234 - 0.808 9.042
Finance & Corporate 3.086 - - 3.086
Housing & Technical 10.929 0.700 - 11.629
Social Work 1.027 - - 1.027
TOTAL CAPITAL PROGRAMME 73.850 8.790 2.608 85.248
30

Page 31

APPENDIX D
(Page 2)
SOUTH LANARKSHIRE COUNCIL 
CAPITAL EXPENDITURE 2024/25 
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 14 JUNE 2024
Resource Name
Annual
Budget
£000
2023/24
C/F
£000
Previous
Slippage
/Adjs
£000
Total
Original
Budget
£000
Proposed
Adjs
£000
Proposed
Slippage
£000
Total
Budget
£000
Forecast
Spend
£000
Forecast
Variance
£000
Actual
£000
Community & Enterprise
Facs, Waste &
Grounds
1,380 1,478 (12) 2,846 0 0 2,846 2,846 - 195
Enterprise &  
Sustainable Dev
18,460 4,769 5,329 28,558 7,408 0 35,966 35,966 - 478
Roads, Transport
& Fleet
11,798 4,995 2,377 19,170 2,482 0 21,652 21,652 - 839
Resource 
Total 31,638 11,242 7,694 50,574 9,890 0 60,464 60,464 - 1,512
Education
Growth /
Accommodation
Pressures
5,531 (2,084) 2,316 5,763 773 0 6,536 6.536 - 1,758
ICT
Developments
1,600  38 - 1,638 0 0 1,638 1,638 - 404
Free School
Meals
0 308 (78) 230 0 0 230 230 - 95
Education Other 0 480 123 603 35 0 638 638 - 228
Resource
Total 7,131 (1,258) 2,361 8,234 808 0 9,042 9,042 - 2,485
Finance & Corporate
IT Services 2,246 684 156 3,086 0 0 3,086 3,086 - 815
Resource
Total 2,246 684 156 3,086 0 0 3,086 3,086 - 815
Housing and Technical
Office Accom 5,852 3,742 (919) 8,675 0 0 8,675 8,675 - 277
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 0 0 1,000 1,000 - 0
Other Housing 304 29 921 1,254 700 0 1,954 1,954 - 15
Resource
Total 7,156 3,771 2 10,929 700 0 11,629 11,629 - 292
Social Work
Alarms / SWIS
Plus
1,341 (318) 4 1,027 0 0 1,027 1,027 - 27
Resource Total 1,341 (318) 4 1,027 0 0 1,027 1,027 - 27
Overall Total 49,512 14,121 10,217 73,850 11,398 0 85,248 85,248 - 5,131
31

Page 32

APPENDIX D
(Page 3)
SOUTH LANARKSHIRE COUNCIL
CAPITAL EXPENDITURE 2023/24
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 14 JUNE 2024
2024/25
Original
Estimate
inc C/F
2024/25
Revised
Budget
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25
Actual to
14/06/24
Expenditure £m £m £m £m £m
General Fund Programme 73.850 85.248 85.248 - 5.131
Income
2024/25
Budget
2024/25
Revised
Budget
2024/25
Actual
To
14/06/24 
£m  £m £m
Prudential Borrowing 32.564 34.364 34.364
Developers Contributions 8.800 8.835 0.000
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund, Cycling
Scotland, Transport Scotland and REF /
Wind Farms)
0.958 1.731 0.446
Scottish Government:
- Capital Grant 20.156 22.278 3.359
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant)
1.440 0.000 0.000
- Vacant and Derelict Land 1.793 1.793 1.368
- Regeneration Capital Grant 2.170 2.170 0.993
- Place Based Investment
Programme
0.727 0.727 0.727
Shared Prosperity Fund 2.645 2.653 0.000
Levelling Up Fund 0.000 7.400 0.000
Capital Receipts 1.340 1.340 0.000
Specific Reserves 1.257 1.957 1.957
Revenue Contribution 0.000 0.000 0.000
TOTAL FUNDING 73.850 85.248 43.214
32

Page 33

Appendix E
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2024/25
BUILD EXECUTIVE SUMMARY
PERIOD ENDED 14 JUNE 2024 (PERIOD 3)
Expenditure Periods
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status
Projects Complete  - - 1 - - - - - - - - - - -
Projects on Programme - - 92 - - - - - - - - - - -
Projects Behind
Programme 
- - 0 - - - - - - - - - - -
Projects Altered Brief/
Programme 
- - 2 - - - - - - - - - - -
Projects Held - - 14 - - - - - - - - - - -
- - 109 0 0 0 0 0 0 0 0 0 0 0
Project Status 
Design Feasibility - - 49 - - - - - - - - - - -
Sketch Design  - - 1 - - - - - - - - - - -
Detailed Design - - - - - - - - - - - - - -
Production Information - - 9 - - - - - - - - - - -
Tendering  - - 24 - - - - - - - - - - -
On Site - - 25 - - - - - - - - - - -
Complete - - 1 - - - - - - - - - - -
- - 109 0 0 0 0 0 0 0 0 0 0 0
33

Page 34

Appendix E
(Page 2)
General Services Capital Programme 2024/25
Build Variance Explanations
Project Name Status Variance Explanation
- - -
34

Page 35

Appendix F
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2024/25
NON BUILD EXECUTIVE SUMMARY
PERIOD ENDED 14 JUNE 2024 (PERIOD 3) 
Expenditure Periods
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Number of Projects
Carried Forward 23/24
Programme - - 61
Approved from 24/25
Programme - - 5
Total Projects Currently
Reported - - 66
Number of Projects
Projects Completed - - 2
Projects Ahead of
Programme - - 0
Projects on Programme - - 34
Projects Behind
Programme - - 0
Projects, Altered
Brief/Programme - - 0
Projects On Hold - - 0
- - 36
35

Page 36

Appendix F
(Page 2)
General Services Capital Programme 2024/25
Non-Build Executive Summary – Project Status
Project Status
SLLC - Booking and Admission System On programme
Philipshill Cemetery - Extension On programme
Ash Die Back On programme
Langlands Boardwalk On programme
Bin Storage Areas On programme
Nature Restoration Fund On programme
Renewal of Play Parks On programme
Greenhall Replacement Bridge On programme
White Bridge Replacement, Chatelherault Country Park (cost design) On programme
Alexander Hamilton Memorial Fountain - Stonehouse Park On programme
Douglas Primary School - Floodlights Complete
Calderglen Country Park - One Way System & Infrastructure On programme
Three Rivers / Clydesdale Way On programme
East Kilbride Town Centre Masterplan On programme
Rural Development Centre - Lanark On programme
SLC Industrial Infrastructure - Energy Efficiency On programme
Carnwath Community and Business Enterprise HUB On programme
Carluke High Mill Community Facility On programme
Shawfield Remediation and Development On programme
Kirktonholme Pitches On programme
Biggar Youth Project On programme
Cambuslang Streetscape - Phase 2 Complete
Coalyard Housing On programme
New Cross Shopping Centre On programme
Vacant & Derelict Land On programme
Schools ICT On programme
IT Infrastructure Refresh On programme
Oracle Upgrade On programme
Digital Transformation Review Fund On programme
Public Switch Telephone Network / Alarms (Analogue to Digital) On programme
Lock Up Areas On programme
Gypsy Travellers Sites On programme
Private Housing Scheme of Assistance (PHSA) On programme
Central Energy Efficiency Fund On programme
Community Alarms On programme
Replacement SWISS Plus IT System On programme
36

Page 37

Appendix G
(Page 1)
GENERAL SERVICES CAPITAL PROGRAMME 2024/25
ROADS EXECUTIVE SUMMARY
PERIOD ENDED 14 JUNE 2024 (PERIOD 3)
1 2 3 4 5 6 7 8 9 10 11 12 13
Number of Projects
Total Projects Currently Reported - - 166
Programme Status
Projects Complete - - 31
Projects on Programme - - 135
Projects Behind Programme - - 0
Projects, Altered Brief / Programme - - 0
Projects Still to Commence - - 0
- - 166
Project Status
Briefing - - 32
Production Information - - 82
Billing - - 0
Tendering - - 3
On Site - - 18
Complete - - 31
- - 166
37

Page 38

Appendix G
(Page 2)
General Services Capital Programme 2024/2025
Roads Variance Explanations
Project Name Status Variance Explanation
- - -
38

Page 39

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 3
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Marchmont Gardens/Failford Road, Strathaven 1 1
Hawthorn Terrace, East Kilbride 1 1
Mount Cameron Drive South and Easdale, East Kilbride 1 1
Stewartfield  Crescent, East Kilbride 1 1
A749 Glasgow Road , East Kilbride (Kingsgate) 1 1
Telford Road, East Kilbride 1 1
Livingstone Drive, East Kilbride 1 1
Troon Avenue, East Kilbride 1 1
Angus Place and Semphill Gardens, East Kilbride 1 1
Stobo, East Kilbride 1 1
Kype Highway / High Kype Road, Strathaven 1 1
Loch Assynt, East Kilbride 1 1
Glasgow Road Service Road, Rutherglen 1 1
Village Road, Cambuslang 1 1
Langlea Road, Rutherglen 1 1
Wellshot Drive, Cambuslang 1 1
Surface Dressing/Preventative Maintenance Schemes
Ardochrig Highway, Auldhouse 1 1
Bents Road, Chapelton 1 1
Burn Highway, Chapelton 1 1
Cairnmuir Road, East Kilbride 1 1
Hairshaw Highway, Strathaven 1 1
Waterhead Peelhill Highway between A71 & B743 1 1
Waterhead Peelhill Highway between A71 & B744 1 1
Preparatory works 24/25 (Patching and drainage) 1 1
Preventative maintemance (Rhinophalt / prep patching) 1 1
Strategic Patching
Newton Station Road, Halfway 1 1
Glen More EK North 1 1
Tewkesbury Road EK 1 1
Buchandyke Road EK 1 1
Capel Grove, EK 1 1
Parking Area Shaftsbury Court EK 1 1
Rockhampton Avenue EK 1 1
Inglis Place, EK  1 1
Craigend Road. 1 1
Castleview Road, Strathaven 1 1
WP Highway, Gilmourton 1 1
St Annes Well, Strathaven 1 1
Crutherland Highway 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title
39

Page 40

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 3
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Millwell Road, Auldhouse 1 1
Churchill Avenue, EK 1 1
Kirktonholme Road, EK (300sqm near Lindores Drive) 1 1
Kirktonholme Road, EK (30sqm near Falkland Drive) 1 1
Quarry Road at Stroud Road 1 1
Stroud Road near column R59 1 1
Eaglesham Road at train station 1 1
Eaglesham Road RAB with Peel Road 1 1
Shawfield Drive, Rutherglen 1 1
Footways
Stewartfield Crescent, East Kilbride 1 1
Kirk Street, Strathaven 1 1
Caribou Green, Three Rivers Walk, East Kilbride (Slabs to asphalt) 1 1
Dovecastle Drive, Strathaven 1 1
Machline, East Kilbride (Slabs to asphalt) 1 1
Steps at railway solum - East Mains Road, Rosslyn Ave and Glamis Drive 1 1
Cathcart Road, Rutherglen 1 1
Curtis Avenue, Rutherglen 1 1
Stonelaw Road, Rutherglen 1 1
Hamilton Area
Strategic Schemes 
Muttonhole Road (Phase 2) 1 1
Lanark Road, Rosebank, Larkhall 1 1
Drygate Street, Larkhall 1 1
A72, Lanark Road, Highlees, Larkhall 1 1
Campbell Street, Hamilton 1 1
Strategic Infrastructure  (Drainage Schemes)
Summerlee Road, Larkhall 1 1
Green Street, Stonehouse 1 1
Meikle Earnock Road, Hamilton 1 1
Preventative Maintenance Schemes
Palace Grounds Road, Hamilton (*TRIAL*) 1 1
Auchentibber Road, Blantyre 1 1
Sandford Road (Phase 1), Stonehouse 1 1
Boghead Highway, Hamilton 1 1
2025/26 Schemes - Preparatory Patching 1 1
Strategic Patching
Swisscott Avenue, Hamilton 1 1
Wellcroft Road, Hamilton  1 1
A72, Lanark Road, Dalserf 1 140

Page 41

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 3
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Burnhouse Road, Hamilton 1 1
Woodlands Avenue, Bothwell 1 1
Morven Avenue, Blantyre 1 1
Palace Grounds Road, Hamilton 1 1
Caird Street, Hamilton 1 1
Townhead Street, Hamilton 1 1
Millheugh Brae, Larkhall 1 1
Candermill and Marlage Road, Larkhall 1 1
Glenburn Avenue, Stonehouse 1 1
Third Road, Blantyre 1 1
Bothwell Road, Uddingston 1 1
Parkneuk Road, Blantyre 1 1
Newhousemill Road, Hamilton 1 1
Muttonhole Road / Highstonehall Road 1 1
Muir Street, Hamilton 1 1
Grier Place, Larkhall 1 1
Footways
Nairn Avenue, Blantyre 1 1
Station Road, Blantyre 1 1
Chestnut Grove, Blantyre 1 1
Craigmuir Road, Blantyre 1 1
Anderson Street / Stewart Street, Hamilton 1 1
Darngaber Gardens, Quarter 1 1
Castle Avenue, Bothwell (Phase 1) 1 1
Castle Avenue, Bothwell (Phase 2) 1 1
Haddow Street, Hamilton 1 1
Woodside Walk, Hamilton 1 1
Lowther Crescent, Stonehouse  1 1
Limekilnburn Road, Quarter 1 1
Clydesdale Area
Strategic Schemes 
A706 Harelaw Roundabout 1 1
A73 Lanark Road, Carluke 1 1
A72 Lanark Road, Crossford 1 1
B715 Climpy Road. Forth 1 1
B7016 Forth to Braehead 1 1
A70 Hazelside to Glespin 1 1
Glenafeoch Road, Carluke 1 1
C4 from Kilncadzow to Lanark (Cartland) 1 1
C37 Harelaw 1 1
B797 Leadhills 1 1
B7018 Lesmahagow Road, Kirkfieldbank 1 1
Roman Court, Cleghorn 1 141

Page 42

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 3
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
B7078 Carlisle Road, Lesmahagow 1 1
Smyllum Road, Lanark 1 1
Jerviswood Road/North Vennel, Lanark 1 1
Orchard Street/Mill Road, Carluke (Sheltered Complex) 1 1
B7016 Libberton to Brownhill Farm 1 1
C1 Mauldslie Road 1 1
Luggie Road/Weighouse Road, Carluke 1 1
B7078 Carlisle Road, Blackwood 1 1
A70 Pretsmill 1 1
The Cut, Lesmahagow 1 1
Gallowhill Road, Lanark 1 1
Boghall Road, Carluke 1 1
Strategic Infrastructure  (Drainage Schemes)
C4 Moor Road, Carland 1 1
A73 Hyndford Rd - Turning of the staff/Sensory Gardendford Road 1 1
Preventative Maintenance Schemes
B797 New Glendorch, Leadhills 1 1
B797Broadlaw Kennels, Leadhills 1 1
Mill Road, Dolphinton 1 1
Libberton Muir Road 1 1
Greenshields Road, Biggar 1 1
Hillhead Road, Covington 1 1
A73 Meadowfoot Road, Covington 1 1
A70 Redford Bridge 1 1
Strategic Patching
Strategic/Machine Patching, Classified Road mainly 1 1
Footways
Roman Court, Cleghorn 1 1
Forrest Road, Lanark 1 1
B7078 Milton 1 1
Violewt Bank 1 1
PARTICIPATORY BUDGET
Clydesdale Area
Footways
St Leonard Steet, Lanark 1 1
ROADS REFURBISHMENT BUDGET
Structures projects
East Kilbride line electrification – Maintenance/refurb of four SLC structures 1 1
Duke Street MSCP – Next phase (3) of the structural appraisal 1 142

Page 43

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 3
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Burnhouse Bridge by Auldhouse – refurbishment and repair 1 1
Cornwall Street Footbridge, East Kilbride – assessment of half joints 1 1
Priestburn Bridge – refurbishment and repair 1 1
Elvanfoot Bridge – bridge refurb & installation of high containment kerbing 1 1
Traffic and Transportaion
Minor works ~ various lining & signing works 1 1
Vehcile Actived Signs ~ Upgrades 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure 1 1
BRIDGES
Clyde Bridge ~ Replacement of existing structure 1 1
20mph/30mph ROAD AND PLACE CRITERIA ASSESSMENT
Road assessments for speed limits in appropriate areas 1 1
CYCLING SCOTLAND
Cycle shelters at schools 1 1
SCOTTISH GOVERNMENT TIER 1 FUNDING (FOPRMERLY CWSR)
Active Travel routes at schools
Pedestrians and cyclists facilities as part of Hairmyres Station project. 1 1
Pedestrian and cycle improvements
Ph.2 ~ Burnbank Road near West Stewart Street 1 1
Toucan Crossing Installations
Eaglesham Road east of Redwood Drive 1 1
Eaglesham Road west of Redwood Drive 1 1
Redwood Drive 1 1
Greenhills Road 1 1
LOCAL AUTHORITY DIRECT AWARD
High Common Road ped crossing upgrade 1 1
Main Street/Nairn St. Blantyre ped crossing upgrade 1 1
Main Street/Broompark ped Crossing upgrade 1 1
Cadzow Sreet ped crossing upgrade (toucan) 1 1
Cycle counter upgrades 1 1
CITY DEAL PROJECTS
Cathkin ~ Loss of value and Noise Insulation Regulations surveys 1 1
Stewartfield Way 1 1
Greenhills/Strathaven Road 1 143

Page 44

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 3
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
32 82 0 3 18 31 31 135 0 0 0
44

Page 45

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2024/2025 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April 2024 to 14
June 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 14 June 2024 from both
a financial and physical perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B. 
4. 2024/25 Housing Capital Programme 
4.1. 2024/25 Budget:  A total Housing Capital Programme budget for 2024/2025 was also
approved by Council in February 2024.  This included funding carried forward from
previous years and gave a total programme of £77.303 million.   
4.2. The Final Outturn report for financial year 2023/2024 (June 2024) noted a carry forward
of £5.203 million into future years. Further analysis of this budget confirms that £3.418
million is required in 2024/2025, with the remainder being carried forward into future
years. 
4.3. In addition, the Executive Committee on 26 June 2024 agreed that the 2024/2025 Capital
Programme be reduced by £3.473 million to reflect the reduction in the Scottish
Government’s Affordable Housing grant for 2024/25. 
4.4. As a result of these adjustments noted at sections 4.2 and 4.3, a revised programme of
£77.248 million has been agreed. Programmed funding for the year also totals £77.248
million.  The budget, along with a detailed breakdown of the funding sources is included
in Appendix A to this report.   
6
45

Page 46

4.5. 2024/2025 Forecast:  In line with our move to the new Fusion IT system, the focus of
capital monitoring will now be the forecast spend position for the financial year. This will
routinely be compared to the annual budget and will mean that Resources will have
early warning of any in-year project overspends or slippage, and will allow corrective
action to be taken, when possible, either to bring spend back in on line, or to accelerate
another approved project so that maximum spend can be incurred in year. 
4.6. The predicted spend position for the Housing Programme for this financial year is £77.248
million.   
4.7. As at 14 June 2024, £10.075 million of funding had been received. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications 
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
25 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council, 21 February 2024
 Executive Committee, 26 June 2024
 Executive Committee, 7 August 2024 
List of Background Papers 
 Capital Ledger prints to 14 June 2024 
46

Page 47

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
47

Page 48

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2024/25
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 14 JUNE 2024 
2024/25
Annual
Budget 
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25
Actual to
14/06/24 
£m £m £m £m
Expenditure 
2024/25 Budget  77.248  77.248  -  10.075     
2024/25
Annual
Budget  
2024/25
Actual to
14/06/24 
£m   £m
Income         
Capital Receipts 0.000   0.093
Capital Receipts – Land Sales 0.000   0.172
Capital Funded from Current Revenue 33.506   9.325
Prudential Borrowing 23.677   0.000
Scottish Government Specific Grant:    
- New Build 16.945   0.000
- Open Market Purchase Scheme 3.000   0.000
- Mortgage to Rent 0.120   0.282
Other Income 0.000   0.203 
77.248   10.075 
48

Page 49

Appendix B
(Page 1)
HOUSING CAPITAL PROGRAMME 2024/2025
EXECUTIVE SUMMARY
PERIOD ENDED 14 JUNE 2024
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Programme Status               
Projects Complete  - - 5 - - - -- - - - - - - -               
Projects on Programme - - 112 - - - - - - - - - - -               
Projects Behind
Programme 
- - 5 - - - - - - - - - - -               
Projects Altered
Brief/Programme
- - 6 - - - - - - - - - - -               
Projects Held  - - 22 - - - - - - - - - - - 
- - 150 0 0 0 0 0 0 0 0 0 0 0               
Project Status              
Design Feasibility  - - 59 - - - - - - - - - - -               
Sketch Design  - - 4 - - - - - - - - - - -               
Detailed Design  - - 2 - - - - - - - - - - -               
Production Information - - 9 - - - - - - - - - - -               
Tendering - - 45 - - - - - - - - - - -               
On Site  - - 26 - - - - - - - - - - -               
Complete - - 5 - - - - - - - - - - -               
- - 150 0 0 0 0 0 0 0 0 0 0 0 
6
49

Page 50

Appendix B
(Page 2) 
Housing Capital Programme 2024/2025 
Build Variance Explanations 
Project Name Status Variance Explanation   
Drumduff Sheltered Housing,
East Kilbride - Internal
Upgrade 
Conservation Area - Timber
Window & Door
Replacement 
Behind Programme 
Behind Programme
This project is behind
programme due to a delay of
the Tender Production.   
This project is behind
programme as a result of
manufacturing delays with
supplier. 
Lorne Street Sheltered
Housing, Hamilton - Internal
Upgrade 
Behind Programme This project is behind
programme as a result of
additional structural and
plastering works required.   
Simpson Court Sheltered
Housing, Uddingston -
Internal Upgrade 
Behind Programme This project is behind
programme due to issues
with door supplier. 
Strutherhill Zone C - External
Fabric Repairs 
Behind Programme This project is behind
programme as a result of 
additional bird nesting
ecology surveys being
arranged. 
50

Page 51

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 24/25 0.000 5.050 10.075 16.096 22.117 28.138 34.159 40.180 46.201 52.222 58.243 64.264 70.285 77.303
Revised Budget 24/25 0.000 5.050 10.075 16.181 22.287 28.393 34.499 40.605 46.711 52.817 58.923 65.029 71.135 77.248
Actual 24/25 0.000 5.050 10.075 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
£ Millions
HRA Capital Expenditure Profile Graph 24/25
6
51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Forum on the overall financial position of the Council’s General Fund
Revenue Account and Housing Revenue Account for the period 1 April 2023 to
31 March 2024.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):
[recs]
(1) that across Resources, Corporate Items, Loan Charges and Council Tax, the
year-end underspend of £0.128 million after proposed Transfers to Reserves
(section 4 and Appendix 1), be noted;
(2) that an additional £0.174 million underspend in the element of the Adult and 
Older People budget delegated to the Integration Joint Board (IJB) (section 
4.5), which the Council allows the IJB to retain within their reserves for future 
care costs, be noted;
(3) that it be noted that the underspend of £0.128 million is after the Probable
Outturn Transfers to Reserves of £23.985 million (Appendix 3);
(4) that the requests for additional year-end Transfers to Reserves totalling £2.238
million (Appendix 4) be noted; 
(5) that the £0.128 million underspend after proposed Transfers to Reserves be
set aside to assist in future Budget Strategies, including pay award
requirements (paragraph 4.11), resulting in a break-even position for the
Council, be noted; and
(6) that the break-even position on the Housing Revenue Account (section 5), be
noted. 
3. Background
3.1. This report will summarise the 2023/2024 year-end position for the Council’s General
Fund Revenue Account and Housing Revenue Account. 
3.2. Section 4 details the final position for the financial year, as well as the movement from
the previously reported Probable Outturn position for the Council. The Housing
Revenue position is shown in section 5. 
3.3. Appendix 1 to the report details the overall spend position for 2023/2024.  This position
includes all Transfers to Reserves. The Transfers to Reserves approved at Probable
Outturn totalling £23.985 million (Executive Committee, 24 January 2024) are shown
in Appendix 3. There were no changes to these Transfers at year-end.  However, there
were new Transfers to Reserves agreed, and these are shown in Appendix 4.  
7
53

Page 54

4. General Services – 2023/2024 Year-End Position
4.1. For reference, the Council’s overall Probable Outturn (including approved Transfers
to Reserves totalling £23.985 million) (Executive Committee, 24 January 2024) was a
forecast break-even position.  This included the corporate Transfer to Reserves of
£9.000 million.   
4.2. The year-end outturn position showed an underspend of £0.128 million. This is after
the approved Transfers to Reserves at year-end.  This is summarised in Table 1, along
with the movement from the break-even position agreed at Probable Outturn.  This
was an improvement of £0.128 million (from the break-even at Probable Outturn to the
underspend of £0.128 million at financial year-end).     
Table 1 – General Service Year-End 2023/2024 (After Transfers to Reserves) 
Probable
Outturn 
£m
Year-End 
£m
Movement
from
Probable
to Outturn
£m
Resource Position (Appendix 2, section 2 to 8) (0.511) (0.453) 0.058
Loan Charges (Appendix 2, section 9) 0.198 0.949 0.751
Corporate Items (Appendix 2, section 10) 6.051 5.403 (0.648)
Corporate Items Strategy – Transfers to
Reserves (Probable Outturn Underspend
Transferred to Reserves)
(9.000) (9.000) -
Council Tax (Appendix 2, section 12) 3.262 3.229 (0.033)
General Services Underspend 2023/2024 - 0.128 0.128  
4.3. This report and appendices provide a detailed analysis of the Council’s financial
position at the end of the year. Appendices 1 and 2 provide detail of the year-end
position with a summary of the £0.128 million noted in sections 4.4 to 4.12.   
4.4. Resources: The overspend position of £0.453 million was after taking into account
the Transfers to Reserves agreed at the Probable Outturn, as well as the additional
transfers proposed by the Resources as part of the year-end position. This overspend
in Resources was less than forecast at Probable Outturn by £0.058 million, and in the
main reflects a minor reduction in spend in Finance and Corporate Resources. Further
detail is noted in Appendix 2 (sections 1 to 8). The Transfers at Probable Outturn and
year-end are detailed in appendices 3 and 4, respectively. The Resources’ Transfers
to Reserves agreed at Probable Outturn were £1.750 million. 
4.5. Within Social Work Resources, the year-end position for Adults and Older People
included a £1.446 million commitment in relation to the element of the budget
delegated to the IJB. This was an increase of £0.174 million on the £1.272 million
predicted at Probable Outturn.  This commitment reflects the agreed position at
Probable Outturn where the Council allowed the IJB to retain this non-recurring
underspend within their reserves, earmarked for future care costs, in line with the
approach to integrating health and social care budgets.  The Executive Committee
approved that these monies be retained in the Council’s Balance Sheet and be
available for use by the IJB. 
4.6. Loan Charges: There was an underspend of £0.949 million after the Transfers to
Reserves approved at Probable Outturn (Appendix 3) and Transfers to Reserves
approved at year-end (Appendix 4). This was a favourable movement of £0.751 million
from the position reported at Probable Outturn and reflects that cash balances
54

Page 55

available to invest were higher than anticipated.  There was also a slightly higher
interest rate on deposits.  There was also a benefit to the HRA. 
4.7. Corporate Items: There was a net underspend of £5.403 million after Transfer to
Reserves (appendices 2 and 3). This was an adverse movement of £0.648 million from
Probable Outturn. However, this position included 3 notable movements since the
Probable Outturn. These are shown in Table 2. 
Table 2: Notable Movements in Corporate Items Since Probable Outturn 
£m
ALEO Baseline Excesses
The anticipated financial detriment of ALEO Charitable Relief
Baseline Excesses in 2023/2024 is £0.125 million. This reflects the
movement in base properties utilised by the Council’s Arm’s Length
External Organisation (ALEO) - (South Lanarkshire Leisure and
Culture SCIO)
(0.125)
Strathclyde Regional Council Intromissions
Glasgow City Council have issued a bill for intromissions in relation
to claims/litigation for the former Strathclyde authorities, for
2023/2024.  The Council has received a payment request due by the
end of June 2024.  The Council’s portion of the overall liability is
£0.730 million. 
(0.730)
Non-Domestic Rates Incentivisation Scheme (NDRIS)
The Council has been advised of an anticipated financial benefit of
NDRIS in 2023/2024, totalling £0.339 million.  The Scottish
Government sets annual targets for growth (buoyancy) and councils
who achieve their target retain 50% of the additional income
generated above the target.  
0.339
Other Minor Movements (0.132)
Revised Position (0.648) 
4.8. Council Tax: The over recovery for the year was £3.229 million, representing a minor
adverse movement of £0.033 million since the Probable Outturn. Further detail is
provided in Appendix 2 (section 12). 
4.9. Transfers to Reserves:  The year-end underspend of £0.128 million included total
Transfers to Reserves of £26.223 million. This included the Transfers to Reserves
approved as part of the Probable Outturn (£23.985 million) (Appendix 3). 
4.10. Additional Transfers to Reserves proposed at year-end totalled £2.238 million. This
reflected the approved carry forward of funding in Reserves to allow committed areas
of spend to be incurred in 2024/2025.  Details of these additional transfers are provided
in Appendix 4. This was agreed by Executive Committee on 26 June 2024 and took
the total Transfers to Reserves at year-end to £26.223 million. 
4.11. The final underspend of £0.128 million is now confirmed and it was agreed that this be
set aside to assist in future Budget Strategies, including pay award requirements.   
4.12. These monies have been transferred to Reserves which resulted in the Council
returning a break-even position for financial year 2023/2024. 
4.13. The transfer of the £0.128 million year-end underspend to Reserves took the total
Transfers to Reserves for the year to £26.351 million. 
55

Page 56

4.14. Year-end Accounting Adjustments: As part of the year-end process, expenditure
was reviewed to identify whether it is Revenue or Capital spend.  While these are not
currently reflected in these monitoring figures, any spend that should be classed as
capital was removed before the closure of the Council’s Accounts.  This had no impact
on the bottom-line position of the Resources. 
4.15. 2023/2024 Pay Award: There were a number of entries required to manage the
Scottish Government funding of the 2023/2024 Pay Award.  These included the use
of additional General Capital Grant of £7.116 million, which had to be transferred to
the Revenue Account to pay for the increased costs experienced in year. The General
Capital Grant has been routed through the Housing Accounts and transferred to the
Revenue Account as cash balances.  This approach follows the guidance in the
Conditions of the General Capital Grant letter for 2023/2024, which allows us to use
the General Capital Grant for Revenue spend. 
4.16. A second Pay Award funding solution identified by the Scottish Government was an
underspend in Pupil Equity Funding (PEF).  The Council’s predicted underspend was
assumed as Pay Award funding at Probable Outturn, however, a year end allocation
from the Scottish Government was received and the PEF funding can now be carried
forward in the usual way.  This is included as one of the proposed Transfers to
Reserves (Appendix 4). 
4.17. Finally, the Council was asked to fund an element of the Pay Award by using Reserves
which would be replenished by further funding being allocated in 2024/2025.  The
assumed Transfer from Reserves (£1.001 million) is included in the figures quoted in
this report and will be replenished when funding is received in 2024/2025.     
4.18. These Pay Award entries had no impact on the Council’s bottom-line.  
5. Housing Revenue Account Year-End 2023/2024
5.1. As at 31 March 2024, the Housing Revenue Account (HRA) showed a break-even
position. 
5.2. This break-even position was after a transfer to the HRA Reserve of £0.360 million.
The HRA budget initially included a Transfer from Reserves of £4.907 million, but due
to the implementation of the Loan Fund Review approved by Council in February 2024,
the Probable Outturn position anticipated a Transfer from Reserves of £0.853 million.   
5.3. Comparing the year-end Transfer to Reserves (£0.360 million) to the Probable Outturn
Transfer from Reserves (£0.853 million) means a favourable movement of £1.213
million. This positive movement was the net result of a number of variances across the
Service area but mainly additional rental income from new build and purchased council
housing being greater than anticipated, and a reduction in loan charges.  These were
offset by additional spend on repairs and maintenance. 
5.4. The details of the variances across the HRA are shown in Appendix 5. 
5.5. As noted in section 4.14, the Scottish Government funding of the 2023/2024 Pay
Award has been routed through the Housing Revenue Account in line with the Terms
and Conditions of the General Capital Grant for this year only. This had no impact on
the bottom-line position and reflects the accounting entries required to manage the
use of Capital funding for Revenue spend.   
6. Employee Implications
6.1. None.
56

Page 57

7. Financial Implications
7.1. As detailed in sections 4 and 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources. The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the Probable
Outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
25 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
57

Page 58

Appendix 1 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (AFTER Transfers) 
Period Ended 31 March 2024 
Committee 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/24
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/24
After
Transfers
Variance 
Annual
Budget
To Actual
After
Transfers
Departments: £m £m £m £m  £m £m £m £m
Community and Enterprise Resources 138.189 137.949 138.189 0.000  137.522 0.667 138.189 0.000
Facilities Streets, Waste and Grounds 83.051 82.724 82.724 0.327  82.527 0.524 82.954 0.097
Fleet, Environmental and Projects 23.227 23.044 23.244 (0.017)  23.058 0.169 23.258 (0.031)
Leisure and Culture Services 5.386 5.022 5.022 0.364  4.999 0.387 4.999 0.387
Planning and Economic Development 4.883 4.574 4.574 0.309  4.521 0.362 4.521 0.362
Roads 21.642 22.585 22.625 (0.983)  22.417 (0.775) 22.457 (0.815)
Education Resources 440.131 440.426 440.426 (0.295)  439.938 0.193 440.417 (0.286)
Education Resources 440.131 440.426 440.426 (0.295)  439.938 0.193 440.417 (0.286)
Finance and Corporate Resources 47.842 48.058 48.058 (0.216)  48.007 (0.165) 48.007 (0.165)
Finance Services - Strategy 2.505 2.471 2.471 0.034  2.397 0.108 2.397 0.108
Finance Services - Transactions 21.980 22.161 22.161 (0.181)  22.078 (0.098) 22.078 (0.098)
Audit and Compliance Services 0.402 0.408 0.408 (0.006)  0.414 (0.012) 0.414 (0.012)
Information Technology Services 6.903 6.903 6.903 0.000  7.159 (0.256) 7.159 (0.256)
Communications and Strategy Services 2.955 2.955 2.955 0.000  2.920 0.035 2.920 0.035
Administration and Licensing Services 4.458 4.678 4.678 (0.220)  4.674 (0.216) 4.674 (0.216)
Personnel Services 8.639 8.482 8.482 0.157  8.365 0.274 8.365 0.274
Housing and Technical Resources 17.943 16.433 17.943 0.000  16.436 1.507 17.946 (0.003)
Housing Services 10.240 8.684 10.169 0.071  8.683 1.557 10.168 0.072
Property Services 7.703 7.749 7.774 (0.071)  7.753 (0.050) 7.778 (0.075)
Social Work Resources 237.210 237.210 237.210 0.000  237.210 0.000 237.210 0.000
Performance and Support Services 6.395 6.210 6.210 0.185  6.062 0.333 6.062 0.333
Children and Family 46.692 46.982 46.982 (0.290)  47.160 (0.468) 47.160 (0.468)
Adults and Older People 182.657 182.657 182.657 0.000  182.657 0.000 182.657 0.000
Justice and Substance Misuse 1.466 1.361 1.361 0.105  1.331 0.135 1.331 0.135
Joint Boards 2.053 2.053 2.053 0.000  2.052 0.001 2.052 0.001
Total Resources  883.368 882.129 883.879 (0.511)  881.165 2.203 883.821 (0.453) 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/24
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/24
After
Transfers
Variance 
Annual 
Budget
To Actual
After
Transfers 
£m £m £m £m  £m £m £m £m
Total Resources  883.368 882.129 883.879 (0.511)  881.165 2.203 883.821 (0.453)
CFCR 0.577 0.577 0.577 0.000  0.577 0.000 0.577 0.000
Loan Charges 38.796 29.340 38.598 0.198  27.409 11.387 37.847 0.949
Corporate Items (7.661) (14.695) (13.712) 6.051  (14.199) 6.538 (13.064) 5.403
Investments T/F to Reserves 2.994 0.000 2.994 0.000  0.000 2.994 2.994 0.000
Transfer of 23/24 Underspend to Reserves 0.000 0.000 9.000 (9.000)  0.000 0.000 9.000 (9.000)
Total Expenditure 918.074 897.351 921.336 (3.262)  894.952 23.123 921.175 (3.100)          
Council Tax 179.102 182.394 182.394 3.292  182.361 3.259 182.361 3.259
Less: Council Tax Reduction Scheme (23.278) (23.308) (23.308) (0.030)  (23.308) (0.030) (23.308) (0.030)
Net Council Tax 155.824 159.086 159.086 3.262  159.053 3.229 159.053 3.229
General Revenue Grant 349.979 349.979 349.979 0.000  349.979 0.000 349.979 0.000
Non-Domestic Rates 341.536 341.536 341.536 0.000  341.536 0.000 341.536 0.000
Transfer from Reserves 70.735 70.735 70.735 0.000  70.735 0.000 70.735 0.000
Total Income 918.074 921.336 921.336 3.262  921.303 3.229 921.303 3.229          
Net Expenditure / (Surplus) Before
Transfers to Reserves
0.000 (23.985) 0.000 0.000  (26.351) 26.351 (0.128) 0.128 
58

Page 59

Appendix 2 
Detail of Year-End Position Across Resources and Centrally Held Budgets 
1. Movement from Last Reported Position: The previously reported Probable Outturn
position for General Services was a break-even position after corporate Transfers to
Reserves of £9.000 million.  At financial year-end, the position was an additional
underspend of £0.128 million.  This was made up of an improvement in Resources of
£0.058 million, an improvement in the centrally held budgets of Corporate Items and
Loan Charges (£0.103 million) and a decrease in the over-recovery of Council Tax /
Council Tax Reduction Scheme (£0.033 million).  Each of the individual areas of the
Council’s General Services budgets are detailed in the remainder of this Appendix.   
2. Resources and Centrally Held Budgets: Details of the Resource positions, including
any assumptions are detailed below. These figures include the Transfers to Reserves
approved at Probable (Appendix 3) as well as those that were approved as part of the
year-end position (Appendix 4). 
3. Community and Enterprise Resources: At year-end, after Transfers to Reserves, the
Resource was showing a break-even position. This was in line with the position
reported at Probable Outturn and was after additional Transfers to Reserves of £0.427
million (Appendix 4).     
4. Education Resources: The year-end position was an overspend of £0.286 million
which was a favourable movement of £0.009 from the position reported at Probable
Outturn. This was after further year-end Transfers to Reserves of £0.479 million
(Appendix 4). 
5. Finance and Corporate Resources: The year-end position was an overspend of
£0.165 million, which represents a favourable movement of £0.051 million from the
position reported at Probable Outturn (£0.216 million over). 
6. Housing and Technical Resources: At year-end, after Transfers to Reserves, the
Resource was showing a minor overspend of £0.003 million, compared to a break-even
position reported at Probable Outturn. 
7. Social Work Resources: The year-end position was break-even, in line with the
Probable Outturn. This position includes an amount of specific funding received in
relation to the IJB that will be retained in the Council’s Balance Sheet and will be
available for use by the IJB (£1.446 million).   
8. Joint Boards: There was a minor underspend of £0.001 million within Joint Boards
(Lanarkshire Valuation Joint Board). The Probable Outturn position was break-even. 
9. Loan Charges: The year-end position was an underspend of £0.949 million, a
favourable movement of £0.751 million from the position reported at Probable Outturn.
This reflects cash balances available to invest being higher than anticipated.  There
was also a slightly higher interest rate on deposits. There was also a benefit to the
HRA. 
10. Corporate Items: The year-end position was a net underspend of £5.403 million, after
Transfers to Reserves. This position includes additional Transfers to Reserves at year
end, totalling £0.152 million, as detailed in in Appendix 4. This was an adverse
movement of £0.648 million compared to Probable Outturn, as detailed in Table 2 of the
report. 
59

Page 60

11. Investments (Transfers to Reserves): After a Transfer to Reserves of £2.994 million
approved at Probable Outturn for the underspend on Front Line First – Facilities, Waste
and Grounds (£1.914 million) and Pre-School Clothing Grants (£1.080 million), there
was a break-even position on this budget line. These transfers are included in in
Appendix 3. 
12. Council Tax including Council Tax Reduction Scheme (CTRS): Council Tax was
showing an over recovery of £3.229 million, comprising an over recovery of Council Tax
of £3.259 million and an overspend on CTRS of £0.030 million. This was a net
decrease of £0.033 million on the position reported as part of the Probable Outturn. 
13. The Council Tax over recovery of £3.259 was due to the following: 
• Empty Property charges - £0.186 million, 
• Arrears collection - £0.960 million
• Additional in-year properties - £1.872 million
• Income from Council Tax Second Homes - £0.241 million 
14. The overspend of £0.030 million on the CTRS reflects current demand for these
payments. 
60

Page 61

Appendix 3
Transfers to Reserves – Included in the Probable Outturn 
Purpose / Description Resource  Value
£m
Resources  
Investment Monies
Investment monies allocated in 2023/2024 for Community Led Investments which will now
spend in 2024/2025.  
Community and
Enterprise
0.200
Fleet Sinking Fund
Annual contribution to the Fleet sinking fund to maintain asset replacement programme.
Community and
Enterprise
0.025
Year 3 of Electric Vehicle Payback
Ringfenced reserves used to manage purchase of electric vehicles in short term which have to
be repaid over the next few years.
Community and
Enterprise
0.015
Total Community and Enterprise Resources   0.240
Ukraine Resettlement Funding
This funding forms part of the 2023/2024 revenue grant redeterminations and will be carried
forward for use in 2024/2025.
Housing and Technical 1.485
Local Heat and Energy Efficiency Strategies (LHEES) Funding
It is proposed that this external funding is carried forward to be utilised in 2024/2025.
Housing and Technical 0.025
Total Housing and Technical Resources  1.510
Total Resource Transfers to Reserves  1.750   
Loan Charges 
Loan Charges Underspend
Underspend to be set aside to manage future overspends predicted in Loan Charges as
previously advised to members (Council, 18 January 2023).
Loan Charges 3.758
Loan Charges Underspend
Underspend from Deposit Interest and Transformation Fund borrowing to be set aside as
included in the 2024/2025 Budget Strategy.  (Executive Committee, 22 November 2023).
Loan Charges 5.500
Total Loan Charges Transfers to Reserves   9.258   
Corporate Items  
Service Concessions
Underspend on Loan Charges used manage anticipated overspends in future years.
Corporate Items 0.437
Insurance Fund
The Insurance Fund will require additional budget into 2024/2025.
Corporate Items 0.300
Central Energy Efficiency Fund (CEEF)
Resources are allocated funding from the CEEF Reserve to pay for spend to save projects
which they repay over future years from the revenue savings generated by the project. This
transfer represents the payback of savings from Resources and allows the Reserve to be
regenerated for use on future projects.
Corporate Items 0.246
Total Corporate Items Transfers to Reserves   0.983   
Investments 2023/24  
Front Line First – Facilities, Waste and Grounds
From the total investment of £3 million, £1.086 million has been retained for spend in
2023/2024 with the remaining £1.914 million to be transferred to reserves for use in future
years.  The £1.914 million has been moved to the budget line 2023/2024 Investments –
Transfers to Reserves and will be transferred to Reserves at the year-end.
Investments 2023/24 (T/f
to Reserves)
1.914
Pre-School Clothing Grants
From the total investment of £1.350 million, an amount of £0.270 million has been retained for
spend in 2023/2024 with the remaining £1.080 million to be transferred to reserves for use in
the next 4 years.  The £1.080 million has been moved to the budget line 2023/2024
Investments – Transfers to Reserves and will be transferred to Reserves at the year-end.
Investments 2023/24 (T/f
to Reserves)
1.080
Total Investments 2023/24 Transfer to Reserves  2.994   
Additional Transfers to Reserves – Use of Probable Outturn Underspend  
Budget Pressures
It is proposed that £3.000 million be transferred to reserves and be used to fund Budget
pressures into 2024/2025.  This proposal is to use this temporary funding to manage the timing
of when permanent budget solutions are identified / delivered.  
Use of Probable Outturn
Underspend
3.000
Contribution to Budget Strategy
In addition, it is proposed that £6.000 million be transferred to reserves.  These monies could
be used in the Council’s Budget Strategy, bearing in mind the previously identified savings
requirement of £95.8 million across the 4 years from 2024/2025.   
Use of Probable Outturn
Underspend
6.000
Total Additional Transfers to Reserves – Use of Probable Outturn Underspend  9.000   
Total Transfers to Reserves Approved at Probable Outturn  23.985 
61

Page 62

Appendix 4
Transfers to Reserves – Additional Proposed Transfers at Year-End 
Purpose / Description Resource  Value
£m
Resources
Chatelherault Play Park
A planned contribution to support the delivery of the upgrade to Chatelherault Play Park as
part of the overall Capital project on play park improvement and the Chatelherault Masterplan. 
Due to timing, this project will complete in 2024/2025.   
Community & Enterprise 0.137
IT Modernisation
Funding carried forward will be used in the development of a new Bereavement management
system, linked to the long-term Bereavement strategy; to upgrade the CONFIRM system
within Grounds; and for the introduction of handheld devices for staff.  Due to timing, this
project will complete in 2024/2025.   
Community & Enterprise 0.290
Total Community and Enterprise Resources  0.427
Pupil Equity Fund
The funding received from the Government can be used up to the end of the school term
(June 2024). The underspend reflects the element of the funding that will be utilised in April to
June 2024.
Education 0.323
School Support Assistant Training
Funding was provided by the Scottish Government in February 2024 to support the training of
support staff in schools, following the findings of the Behaviour in Scottish Schools Research
(2023).  Funding carried forward to 2024/2025 will allow training plans to be developed.  
Education 0.057
ELC Footwear and Clothing Grant
Balance of Investment monies for the provision of Footwear & Clothing Grants to pre-school
children (Early Years) in 2023/2024 to be carried forward. This underspend reflects the level of
demand for Grants during the year and will be redirected to 2024/205 investments, as per the
Budget Amendment approved in February 2024.  
Education 0.099
Total Education Resources 0.479
Total Resource Proposed Transfers to Reserves at Year-End  0.906   
Loan Charges  
Interest on Revenue Balances transferred to Fund reserves. Loan Charges 1.180
Total Loan Charges Proposed Transfers to Reserves   1.180   
Corporate Items  
Renewable Heat Incentive (RHI) and Feed In Tariff (FIT)
Income from RHI and FIT is received in-year and will be set aside for use in future years. As
per the discussion at Executive Committee on 26 June 2024, consideration will be given to
earmarking these monies for Central Energy Efficiency Fund (CEEF) spend when that future
programme is being put together.
Corporate Items 0.152
Total Corporate Items Proposed Transfers to Reserves at Year-End  0.152   
Total Proposed Transfers to Reserves at Year-End (Excluding Year-End Underspend)  2.238   
Additional Transfers to Reserves – Use of Year-End Underspend  
Future Budget Strategies
It is proposed that the outturn underspend of £0.128 million be transferred to Reserves for use
in future Budget Strategies, including pay award requirements.
Use of Year-End
Underspend
0.128
Total Additional Transfers to Reserves – Use of Year-End Underspend  0.128   
Total Proposed Transfers to Reserves at Year-End (Including Year-End Underspend)  2.366 
62

Page 63

Appendix 5 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 31 March 2024 (No.15) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
31/03/24
Actual 
31/03/24
Variance
31/03/24 
% Variance
31/03/24 Notes            
Budget Category           
Employee Costs 15.310  15.401  (0.091) 15.310  15.369  (0.059)  over (0.4%) 
Property Costs 49.282  54.963  (5.681) 49.282  55.322  (6.040) over (12.3%) 1
Supplies & Services 0.653  0.691  (0.038) 0.653  0.949  (0.296) over (45.3%) 
Transport & Plant 0.196  0.189  0.007  0.196  0.173  0.023  under 11.7% 
Administration Costs 5.570  5.597  (0.027) 5.570  5.663  (0.093) over (1.7%) 
Payments to Other Bodies 3.121  3.126  (0.005) 3.121  10.265  (7.144) over (228.9%) 2
Payments to Contractors 0.100  0.145  (0.045) 0.100  0.147  (0.047) over (47.0%) 
Transfer Payments 0.000  0.000  0.000  0.000  0.000  0.000  - 0.0% 
Financing Charges 27.229  27.229  0.000  27.229  20.178  7.051  under 25.9% 3
Total Controllable Exp. 101.461  107.341  (5.880) 101.461  108.066  (6.605) over (6.5%) 
Total Controllable Inc. (114.440) (115.268) 0.828  (114.440) (116.578) 2.138  over
recovered 1.9% 4
Transfer to/(from) Balance
Sheet (4.907) (0.853) (4.054)  (4.907) 0.360 (5.267)  under
recovered (107.3%) 5
Net Controllable Exp. (17.886) (8.780) (9.107) (17.886) (8.152) (9.734) over (54.4%) 
Loan Charges 17.886  8.780  9.107  17.886  8.152  9.734  under (54.4%) 6
Net Controllable Exp. 0.000  0.000  0.000  0.000  0.000  0.000  - 0.0% 
Variance Explanations 
1. Property Costs:  The overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor. 
2. Payments to Other Bodies:  The overspend reflects the release of HRA surplus to the General Fund in line with the General Capital Grant conditions where the
funding for the pay award was to be routed through the Housing Accounts.  The offset is an underspend in Capital Financed from Current Revenue (see 3 below). 
This has no impact bottom line.
3. Financing Charges: The underspend offsets the overspend in Payments to Other Bodies (see 2 above). 
4. Income:  The additional income is due to the favourable timing of new build and purchased Council housing units being available to rent, and greater than budgeted
insurance income.
5. Transfers to/from Reserves: The year end position is a Transfer to Reserves, rather than the budgeted Transfer from Reserves.  This positive movement is the
net result of a number of variances across the Service area but mainly additional rental income from new build and purchased Council housing being greater than
anticipated, and a reduction in loan charges.  These are offset by additional spend on repairs and maintenance.  
6. Loan Charges: The underspend is due to the utilisation of an in-year benefit from the Housing Revenue Account Loans Fund Review. 
Virements
None. 
63

Page 64

64

Page 65

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget 2023/2024 - Detailed Resource
Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2023/2024
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):
[recs]
(1) that the 2023/2024 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted. 
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 31 March 2024. The detailed papers cover the
General Services and also the Housing Revenue Account.   
3.2. The following information is provided for each Resource and the Housing Revenue
Account: 
 an Executive Summary showing the top-level position
 details of the most significant variances across Subjective headings and across
Services
 a line-by-line trend analysis of the total Resource expenditure and income
across Subjective headings 
3.3. These are shown in appendices A to F attached. 
4. Employee Implications
4.1. None 
5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.   
8
65

Page 66

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources. The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
25 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Revenue Ledger prints to 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk 
66

Page 67

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2024 (No 15)
Community and Enterprise Resources
Committee Annual Forecast Annual Annual Budget Actual Variance
Budget for Year Forecast Forecast Proportion to Period 15 31/03/24
Before Variance Variance 31/03/24 31/03/24 Before
Transfers Before After Before Transfers
Transfers Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Facilities, Streets, Waste and Grounds 83.051 82.724 0.327 0.327 83.051 82.527 0.524 under
Fleet, Environmental and Projects 23.227 23.044 0.183 (0.017) 23.227 23.058 0.169 under
Leisure and Culture Services 5.386 5.022 0.364 0.364 5.386 4.999 0.387 under
Planning and Economic Development 4.883 4.574 0.309 0.309 4.883 4.521 0.362 under
Roads 21.642 22.585 (0.943) (0.983) 21.642 22.417 (0.775) over
Position Before Transfer to Reserves 138.189 137.949 0.240 0.000 138.189 137.522 0.667 under
Transfers to Reserves as at 31/03/2024 0.000 0.667 (0.667) over
Position After Transfers to Reserves at 31/03/2024 138.189 138.189 0.000 under
8
67

Page 68

Community and Enterprise Resources Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 5,029k
under
APT&C Basic/Superannuation/NI -
5,494k under 
Facilities, Waste and
Grounds Services –
3,064k under 
Planning and
Regulatory Services -
389k under 
Enterprise and
Sustainable
Development - 387k 
Under 
Roads, Transportation
and Fleet Services -
1,654k under
The variances are mainly due to
vacant posts, with recruitment
currently being progressed and
posts being held for savings in
future years. 
In addition, within Roads
Construction the underspend is
partially offset by an overspend
in Payment to Contractors due
to increased level of sub-
contractors and a reduced
charge to the Roads General
account. 
Overtime - (323k) over  Facilities, Waste and
Grounds Services -
(613k) over 
The overtime variance is mainly
within Grounds and due to
vehicle checks, verge
maintenance works and
weekend work at cemeteries
and golf courses. There is also
an overspend within Waste due
to high staff absences, and
vehicle availability as a result of
outstanding vehicle repairs. It is 
68

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.)  
Roads, Transportation
and Fleet Services -
302k under 
currently offset by underspends
in basic pay (above). 
The underspend mainly relates
to overtime being less than
anticipated within Roads
Construction on maintenance
and winter maintenance. 
Additional Pension Costs - (90k) over  Facilities, Waste and
Grounds Services -
(79k) over 
Roads, Transportation
and Fleet Services -
(11k) over 
The overspend relates to the
ongoing cost of early retirals. 
Property Costs (680k) over Rates - (27k) over Facilities, Waste and
Grounds Services -
(19k) over 
Enterprise and
Sustainable
Development – (20k)
over
The overspend is mainly due to
the retention of Peel Park as a
temporary mortuary. This cost
was offset by income recovered
from NLC. 
The overspend relates to non
domestic rates for vacant units
within Hamilton Towers, Castle
Street.   
Rent - 140k under  Roads, Transportation
and Fleet Services -
(18k) over 
The level of rent is higher than
anticipated for the depots within
Roads Contracting. 
69

Page 70

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.)  
Facilities, Waste and
Grounds Services - 47k
under 
Leisure - (11k) over 
Enterprise and
Sustainable
Development - 123k
under 
The level of rent is lower than
anticipated for the depots within
Waste, Streets and Grounds. 
The overspend is mainly due to
properties which have been
handed back to the council. 
The underspend is due to
vacating units within Hamilton
Towers, Castle Street. This is
being used to support
dilapidation costs. 
Repairs & Maintenance - Internal
Contractors - (96k) over
Enterprise and
Sustainable
Development - (59k)
over 
Roads, Transportation
and Fleet Services -
(23k) over 
The overspend is due to design
fees for structural works at
Hamilton Towers.  This is
partially offset by an
underspend in costs for
Whitemoss Tennis Court which
is offset by an under recovery in
income. 
The overspend mainly relates to
the upkeep of the Road’s
construction depots.  
Repairs & Maintenance - External
Contractors - (28k) over
Roads, Transportation
and Fleet Services -
(19k) over 
The overspend mainly relates to
the upkeep of the Road’s
construction depots.
70

Page 71

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Electricity Contract - (189k) over Facilities, Waste and
Grounds Services -
(51k) over 
Roads, Transportation
and Fleet Services -
(141k) over 
The overspend is mainly within
Streets and Bereavement
services, due to charges being
greater than budget. 
The overspend mainly relates to
charges in excess of budget for
Electrical vehicle charging. This
is partially offset by a recovery
of income. 
Janitor Service - (54k) over Facilities, Waste and
Grounds Services -
(54k) over 
This overspend relates to Biffa
waste uplift charges in addition
to Refuse Uplift below (£22k). 
Cleaning & Janitorial Supplies - (283k) 
over
Facilities, Waste and
Grounds Services -
(280k) over 
The overspend relates to an
increase in costs for cleaning
materials.  
Health and Hygiene Materials - (71k)
over
Facilities, Waste and
Grounds Services -
(71k) over
The overspend is due to an
increase in costs for sanitary
and nappy bins within Facilities.  
Refuse Uplift - (26k) over Facilities, Waste and
Grounds Services -
(22k) over 
The overspend relates to
greater than budgeted
expenditure on refuse uplift in
schools within Facilities
Management. 
71

Page 72

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services 
(683k) over Computer Equipment Purchase -
(181k) over 
IT Equipment Maintenance Contract -
(69k) over 
Equipment, Apparatus & Tools - 57k
under 
Facilities, Waste and
Grounds Services - 48k
under 
Planning and
Regulatory Services -
(29k) over 
Roads, Transportation
and Fleet Services -
(179k) over 
Enterprise and
Sustainable
Development - (17k)
over 
Roads, Transportation
and Fleet Services -
(46k) over 
Roads, Transportation
and Fleet Services -
41k under
The Facilities underspend
relates to IT charges for school
kitchen laptops being less than
budget. 
The overspend within Waste is
due to the new Bartec incab
computer system in the Refuse
Collection Vehicles. 
The overspend mainly relates to
the greater than budgeted costs
on the IT system upgrade within
Planning & Building Standards. 
The overspend mainly relates to
increased annual subscriptions
costs for Computer Licences
within Roads. 
The overspend is within
Support and relates to greater
than budgeted IT leasing costs. 
The overspend is within Fleet
services and relates to costs for
the Fleet plan system and
associated upgrades. 
The underspend within Fleet
relates to equipment. This is
72

Page 73

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
Materials - (227k) over 
Foodstuffs General - (213k) over 
Protective Clothing and Uniforms -
(70k) over 
Facilities, Waste and
Grounds Services -
(674k) over 
Roads, Transportation
and Fleet Services -
457k under 
Facilities, Waste and
Grounds Services -
(211k) over 
Facilities, Waste and
Grounds Services -
(67k) over 
transferred to reserves at year-
end for the Fleet Sink Fund. 
The overspend mainly relates to
an increased level of spend on
replacement domestic waste
bins, and materials within
Grounds and Streets which is
recovered via income. 
The underspend relates to a
reduced level of materials
required for Roads and Lighting
maintenance. 
The overspend is due to
increase in food prices and
increase in demand in school
meals which is partially offset
by over recovery in income. 
The overspend is mainly due to
the requirement for new
improved PPE for operatives
within Facilities. 
73

Page 74

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant 
(1,961k)
over
Purchase of Vehicles – 71k under Roads, Transportation
and Fleet Services -
71k under 
The underspend is due to the
timing of invoices for leasing. 
Purchase of Plant - 73k under Facilities, Waste and
Grounds Services - 68k
under 
The favourable variance is
mainly within Streets and
Bereavement services and
reflects reduced levels of spend
on plant. 
Fleet Services - Fuel - (294k) over Roads, Transportation
and Fleet - (295k) over
The overspend within Fleet is
mainly due to the increased
costs of fuel.  Partially offset by
an over recovery in income.
Also, the costs related to
electric vehicle charging
stations which is offset by an
over recovery in income. 
Fleet Services - Vehicle Hires - (524k)
over 
Roads, Transportation
and Fleet - (450k) over 
Planning and
Regulatory Services –
(82k) over 
The overspend is mainly due to
the timing of the achievement of
efficiencies within Fleet. 
The overspend is within
Projects and relates to the
electric pool car scheme. This is
offset by an over recovery in
income. 
Licences – (90k) over  Roads, Transportation
and Fleet - (85k) over 
The overspend is within Fleet
and is in the main due to
Telematics licences, Road Fund
Licenses and 
74

Page 75

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.)   
MOT certificates. Partially offset
by an over recovery in income. 
Fleet Services - Repairs - (1,373k)
over 
Roads, Transportation
and Fleet - (1,370k)
over 
The overspend is mainly due to
the timing of the achievement of
efficiencies within Fleet and the
costs within the workshop for
outside repairs and materials
being greater than anticipated.
This is partially offset by an
underspend in employee costs. 
Fleet Service Charges - Vehicle
Maintenance - (225k) over
Facilities, Waste and
Grounds Services -
(141k) over 
Roads, Transportation
and Fleet - (81k) over 
The overspend is due to higher
than anticipated charges for
additional routine maintenance
within Waste, Streets and
Grounds. 
The overspend within Fleet is
due to higher than anticipated
charges for additional routine
maintenance. 
Fleet Services Charges – Asset
Modification – 49k under
Facilities, Waste and
Grounds Services - 21k
under 
Roads, Transportation
and Fleet - 28k under 
The underspend is mainly
within Waste services due to
the number of vehicles being
modified being less than
expected. 
The underspend is within
Roads, General and Fleet and
is due to a less demand for
vehicle modifications. 
75

Page 76

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.) 
Fleet Service Charges - Leasing -
247k under
Roads, Transportation
and Fleet - 236k under 
Facilities, Waste and
Grounds Services - 16k
under 
The underspend is within Fleet
and relates to a change in
leasing periods for Passenger
Service Agreements and Pool
Cars. 
The underspend is due to a
reduction in the number of
leased vehicles required within
the Streets service. 
Fleet Service Charges – Hired
Vehicles - (73k) over 
Facilities, Waste and
Grounds Services -
124k under 
Roads, Transportation
and Fleet – (200k) over 
The underspend is within
Grounds services and is due to 
a reduction in the use of hired
vehicles. 
The overspend relates mainly to
the hire of vehicles within
Roads General for Winter
Maintenance. 
Fleet Service Charges - Contract Hire
- (154k) over
Facilities, Waste and
Grounds Services -
(29k) over 
Roads, Transportation
and Fleet - (113k) over 
The overspend reflects the
charge for EV pool cars
previously grant funded. 
Fleet Service Charges - Fuel - 261k
under
Facilities, Waste and
Grounds Services -
110k under
Small underspends within
Facilities, Grounds and Streets
give rise to the underspend. 
76

Page 77

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.) 
Roads, Transportation
and Fleet - 141k under
Fleet spend is lower than
budget due to use of electric
pool car vehicles. This is
partially offset by a
corresponding under recovery
in pool car income. 
Hire of External Vehicles - 39k under Facilities, Waste and
Grounds Services - 39k
under 
The underspend is within
Streets and is due to a
decrease in demand for electric
vehicles. 
Hire of External Plant - (34k) over Facilities, Waste and
Grounds Services -
(22k) over 
Roads, Transportation
and Fleet - (12k) over 
The overspend is within Waste
and is for the hire of a material
handler hydraulic grab currently
replacing the leased vehicle. 
The overspend is within Roads
Construction and is due to an
increased demand for the hire
of external plant. 
Administration (142k) over Printing and Stationery - (37k) over Facilities, Waste and
Grounds Services -
(34k) over 
The overspend is mainly due to
the printing of menus and
promotional material within
Facilities Management 
Roads, Transportation
and Fleet – (16k) over
The overspend is mainly due to
expenditure on Health and
Safety manuals within Roads
Contracting.
77

Page 78

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs (cont.) 
Telephones - 46k under  Facilities, Waste and
Grounds Services - 9k
under 
The underspend relates to
charges being less than budget. 
Planning and
Regulatory Services -
15k under 
Enterprise and
Sustainable
Development - 15k
under 
Mobile Phones - 34k under Facilities, Waste and
Grounds Services - 12k
under 
Roads, Transportation
and Fleet - 22k under
The underspend a reflection of
charges being less than
anticipated. 
Postages/Couriers - (17k) over Roads, Transportation
and Fleet - (12k) over 
The overspend is mainly due to
an increased level of postages
within Roads. 
78

Page 79

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs (cont.) 
Medical Costs - (77k) over  Facilities, Waste and
Grounds Services -
(58k) over 
Roads, Transportation
and Fleet - (18k) over 
The overspend reflects a higher
than anticipated level of medical
referrals due to staff absence
levels. 
Training - (91k) over Planning and
Regulatory Services -
(10k) over 
Roads, Transportation
and Fleet - (74k) over 
The overspend reflects
increased costs for specialised
training within Environmental
Health. 
The overspend relates to
greater than budgeted costs for
statutory training within the
Roads service. 
Payments to Other
Bodies
(171k) over SPTE: Maintenance of Bus Shelters
and Stops - 31k under
Roads, Transportation
and Fleet – 31k under
The annual charge from
Strathclyde Partnership for
Transport was less than budget. 
Other Local Authorities - 25k under Planning and
Regulatory Services -
29k under 
The underspend within
Environmental Services is due
to a decrease in demand for
scientific services.   
Payment to Other Bodies - (229k)
over
Facilities, Waste and
Grounds Services -
(22k) over 
The overspend relates to a
contribution towards Voluntary
Action South Lanarkshire in
respect of Get South
Lanarkshire Walking Project. 
79

Page 80

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies (cont.) 
Roads, Transportation
and Fleet - (200k) over
The overspend is mainly due to
increased payments for weather
forecasts over the winter
months, partially offset by
income. 
Payments to
Contractors 
(2,082k)
over
Payment to Trading Services
Contractor - (707k) over
Roads, Transportation
and Fleet - (707k) over
The overspend is due to higher
than anticipated costs in
respect of reactive maintenance
within the Hamilton area, and
Street Lighting. 
Payment to Private Contractor -
(1,362k) over
Facilities, Waste and
Grounds Services -
(548k) over 
The overspend is due to greater
than budgeted disposal costs
within Waste services. This has
been managed within the
Resource overall. 
Planning and
Regulatory Services -
(618k) over 
Leisure - 202k under 
The overspend relates to an
increase in demand for Clinical
Waste services (738k) and
Projects (43k) that are being
offset by an over recovery of
income. 
The underspend is on
Community Led Activities, and
has been transferred to
reserves, as approved by
Executive Committee at the
probable outturn.   
80

Page 81

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors (cont.) 
Roads, Transportation
and Fleet - (377k) over
The overspend results from an
increased level of sub-
contractors being used due to
staff turnover during the year.
Additionally, the level of
specialist works required within
Roads Construction, and works
being carried out within
Structures and Traffic sections
are higher than budget – these
are funded from employee
costs. 
Financing Charges  (58k) over I.T. Equipment Leasing - Contract -
(70k) over
Facilities, Waste and
Grounds Services -
(14k) over 
Planning and
Regulatory Services -
(15k) over 
Enterprise and
Sustainable
Development - (31k)
over 
Roads, Transportation
and Fleet - (10k) over
The overspend is due to higher
than budgeted costs for IT
Equipment Leasing. 
81

Page 82

Subjective Head Variance  Subjective line Service / amount Explanation
Income 1,415k over
recovered
Contributions from Other Bodies -
177k over recovered
Planning and
Regulatory Services -
170k over recovered 
The over recovery within
Projects is due to income
received from the Scottish
Government that reflects spend
on Environmental Air Quality 
projects. This is offset by an
overspend in Payment to
Contractors. 
Sales - General - 294k over recovered Facilities, Waste and
Grounds Services –
146k over recovered 
Roads, Transportation
and Fleet - 148k over
recovered 
The over recovery is mainly due
to an increase in School Meals
income within Facilities
Management due to demand. 
The over recovery mainly
relates to higher than
anticipated income from skip
permits and road closures.  
Sales - Department of the Authority -
156k over recovered
Facilities, Waste and
Grounds Services - 24k
over recovered 
The over recovery is mainly due
to the sale of domestic waste
bins for council houses. 
Roads, Transportation
and Fleet - 132k over
recovered
The over recovery is mainly due
to higher than anticipated
income recovered from Street
Lighting rechargeable works. 
82

Page 83

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges - General - (225k)
under recovered
Facilities, Waste and
Grounds Services -
154k over recovered 
Planning and
Regulatory Services -
(115k) under recovered
The over recovery is mainly
within Bereavement Services
which relates to the high 
demand for cremations and
over recovery in income from
bulky uplift. 
The under recovery is mainly
due to the current level of
Planning and Building 
Roads, Transportation
and Fleet - (272k)
under recovered 
Standards applications income
being less than anticipated. 
The under recovery is within
Parking where the demand is
less than anticipated. 
Fees and Charges - Department of
the Authority – 1,005k over recovered 
Facilities, Waste and
Grounds Services -
(184k) under recovered 
The under recovery is the net
effect of reduced works within
Grounds as part of the Ash Die
Back project. This is partially
offset by over recovery within
Waste.   This is due to an
increase in additional service
requests to Waste services
from Housing and Technical
Resources for additional bin
uplifts. 
83

Page 84

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)   Planning and
Regulatory Services –
671k over recovered 
Roads, Transportation
and Fleet – 518k over
recovered.
The over recovery relates to
income received for clinical
waste which offsets the
overspend within Payment to
Contractors. 
The over recovery in Fleet
relates mainly to income
received for electric vehicle
charging stations which offsets
an overspend in Fuel. There is
also an over recovery in 
Passenger Service Agreement
income. 
Fleet Services - 993k over recovered Roads, Transportation
and Fleet - 993k over
recovered. 
Fleet is over recovered mainly
due to vehicle maintenance
charges. This partially offsets
an overspend in transport and
plant within the workshop. 
Other Income – (61k) under recovered Facilities, Waste and
Grounds Services - 53k
over recovered 
Enterprise and
Sustainable
Development - 37k
over recovered 
The over recovery is mainly due
to additional service requests
received within Grounds. 
The over recovery is mainly
within Support and relates to an
increase in rental property
income, which is recovered
from Housing and Technical
Resources. 
84

Page 85

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)   Roads, Transportation
and Fleet - (153k)
under recovered.
The under recovery is within
Fleet and is due to income
received for pool cars being
less than budget, due to a
decrease in demand. 
Recovery from Capital - (538k) under
recovered 
Roads, Transportation
and Fleet – (538k)
under recovered. 
The under recovery is due to a
reduced level of capital works
that were undertaken within
Transport and Engineering.   
Recharges - Departments of the
Authority - (416k) under recovered 
Roads, Transportation
and Fleet - (128k)
under recovered. 
Facilities, Waste and
Grounds Services -
(288k) under recovered 
The current level of income
from maintenance works is less
than anticipated within Roads
Construction. 
The under recovery is within
Facilities and relates mainly to a
reduced demand in cleaning
services, as well as a shortfall
in Grounds services due to
income from adoption monies. 
* The underlined variances represent new variances since the last report.
85

Page 86

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023-24 SLC 23/24 2 TO DATE AMOUNT Under
`
EMPLOYEE COSTS
APT & C BASIC 79,293 73,951 5,342 under
APT & C OVERTIME 1,681 2,004 (323) over
APT & C SUPERANNUATION 13,323 13,353 (30) over
APT & C NIC 6,542 6,360 182 under
TRAVEL AND SUBSISTENCE 76 77 (1) over
OTHER EMPLOYEE COSTS 515 529 (14) over
PENSION INCREASES 1,107 1,144 (37) over
ADDITIONAL PENSION COSTS 0 90 (90) over
EMPLOYEE COSTS 102,537 97,508 5,029 under
PROPERTY COSTS
RATES 909 936 (27) over
SCOTTISH WATER - UNMETERED CHARGES 25 21 4 under
SCOTTISH WATER - METERED CHARGES 155 161 (6) over
RENT 589 449 140 under
SERVICE CHARGE 42 68 (26) over
FACTORING CHARGES 16 26 (10) over
BED AND BREAKFAST 0 0 0
PROPERTY INSURANCE 283 278 5 under
SECURITY COSTS 42 40 2 under
GROUND MAINTENANCE 8 16 (8) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 125 221 (96) over
LIFE CYCLE MAINTENANCE 0 7 (7) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 31 59 (28) over
ADAPTIONS - INTERNAL CONTRACTORS 0 6 (6) over
GAS HEATING LEASE COSTS 0 1 (1) over
ASBESTOS 0 1 (1) over
ELECTRICITY - CONTRACT 1,320 1,509 (189) over
GAS 164 158 6 under
HEATING OIL 14 15 (1) over
FIXTURE & FITTINGS 0 1 (1) over
JANITOR SERVICE 0 54 (54) over
CLEANING CONTRACT 24 15 9 under
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 430 713 (283) over
HEALTH & HYGIENE MATERIALS 25 96 (71) over
PEST CONTROL 0 4 (4) over
REFUSE UPLIFT 404 430 (26) over
OTHER PROPERTY COSTS 31 32 (1) over
PROPERTY COSTS 4,637 5,317 (680) over
86

Page 87

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023-24 SLC 23/24 2 TO DATE AMOUNT Under
`
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 549 730 (181) over
COMPUTER EQUIPMENT MAINTENANCE 42 40 2 under
I.T. EQUIPMENT MAINT-CONTRACT 199 268 (69) over
I.T. ELECTRONIC MESSAGING 3 0 3 under
EQUIPMENT, APPARATUS AND TOOLS 1,141 1,084 57 under
SMALL TOOLS 107 104 3 under
FURNITURE - OFFICE 0 1 (1) over
FURNISHINGS (INCL. CROCKERY & LINEN) 110 93 17 under
MATERIALS 8,108 8,335 (227) over
MATERIALS (INSURABLE LOSSES) 0 2 (2) over
MATERIALS, APPARATUS AND EQUIPMENT 9 11 (2) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 1 1 under
FOODSTUFFS - GENERAL 5,662 5,875 (213) over
PROTECTIVE CLOTHING & UNIFORMS 207 277 (70) over
LAUNDRY COSTS 10 9 1 under
OTHER SUPPLIES AND SERVICES 216 205 11 under
MAJOR SUPPLY OF ELECTRICAL POWER 2,611 2,620 (9) over
OUTSOURCED MAIL 0 4 (4) over
DELIVERY CHARGE 1 2 (1) over
I- PROCUREMENT ERRORS 0 (1) 1 under
SUPPLIES AND SERVICES 18,977 19,660 (683) over
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 156 85 71 under
PURCHASE OF PLANT 229 156 73 under
FLEET SERVICES - DRIVERS 58 65 (7) over
FLEET SERVICES - FUEL 3,645 3,939 (294) over
FLEET SERVICES - VEHICLE HIRE 1,363 1,887 (524) over
POOL CAR CHARGES - RENTAL 57 75 (18) over
POOL CAR CHARGES - FUEL 21 3 18 under
POOL CAR CHARGES - ADDITIONAL COSTS 7 5 2 under
OTHER TRANSPORT COSTS 78 79 (1) over
TRANSPORT INSURANCE 93 93 0
LICENCES 491 581 (90) over
FLEET SERVICES - REPAIRS 1,474 2,847 (1,373) over
PLANT SERVICES 19 4 15 under
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,421 4,646 (225) over
FLEET SERVICE CHARGES - PLANT MAINTENANCE 269 223 46 under
FLEET SERVICE CHARGES - ASSET MODIFICATION 71 22 49 under
FLEET SERVICE CHARGES - LEASING 5,774 5,527 247 under
FLEET SERVICE CHARGES - HIRED VEHICLES 1,475 1,548 (73) over
FLEET SERVICE CHARGES - CONTRACT HIRE 30 184 (154) over
FLEET SERVICE CHARGES - ROAD FUND LICENCE 218 190 28 under
FLEET SERVICE CHARGES - FUEL 2,882 2,621 261 under
FLEET SERVICE CHARGES - DRIVERS 102 108 (6) over
HIRE OF EXTERNAL VEHICLES 39 0 39 under
HIRE OF EXTERNAL PLANT 328 362 (34) over
HIRE OF SKIPS 17 24 (7) over
STORAGE 0 4 (4) over
TRANSPORT AND PLANT 23,317 25,278 (1,961) over
87

Page 88

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023-24 SLC 23/24 2 TO DATE AMOUNT Under
`
ADMINISTRATION 
PRINTING AND STATIONERY 151 188 (37) over
TELEPHONES 105 59 46 under
MOBILE PHONES 64 30 34 under
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 8 0
ADVERTISING - OTHER 85 82 3 under
POSTAGES/COURIERS 32 49 (17) over
MEMBERSHIP FEES/SUBSCRIPTIONS 55 46 9 under
INSURANCE 260 262 (2) over
MEDICAL COSTS 5 82 (77) over
LEGAL EXPENSES 18 18 0
PETTY OUTLAYS 0 (2) 2 under
HOSPITALITY / CIVIC RECOGNITION 3 6 (3) over
INTERNET AGENCY FEES 23 33 (10) over
SECURITY UPLIFT FEES 26 20 6 under
OTHER ADMIN COSTS 4 6 (2) over
CONFERENCES - MEMBERS (incl associated 0 3 (3) over
TRAINING 3 94 (91) over
ADMINISTRATION 842 984 (142) over
PAYMENT TO OTHER BODIES 
SPTE: ANNUAL BUS SUBSIDY 1,892 1,892 0
SPTE: BUS OTHER 258 258 0
SPTE: FERRIES 29 29 0
SPTE: UNDERGROUND 1,318 1,318 0
SPTE: OTHER 1,727 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 100 31 under
OTHER LOCAL AUTHORITIES 75 50 25 under
GRANTS TO VOLUNTARY ORGANISATIONS 22 20 2 under
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 39 0
PAYMENTS TO OTHER BODIES 6,788 7,017 (229) over
EXTERNAL AUDIT FEES 3 3 0
PAYMENT TO OTHER BODIES 12,282 12,453 (171) over
PAYMENT TO CONTRACTORS 
PAYMENT TO TRADING SERVICES CONTRACTOR 187 894 (707) over
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 306 (4) over
PAYMENT TO PRIVATE CONTRACTOR 45,879 47,241 (1,362) over
PAYMENT TO INTERNAL CONSULTANTS 7 16 (9) over
PAYMENT TO CONTRACTORS 46,375 48,457 (2,082) over
88

Page 89

South Lanarkshire Council
REVISED
Community and Enterprise Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023-24 SLC 23/24 2 TO DATE AMOUNT Under
`
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 617 0
TRANSFER PAYMENTS 617 617 0
FINANCING CHARGES 
LEASING CHARGES - FINANCE 0 1 (1) over
I.T. EQUIPMENT LEASING-CONTRACT 175 245 (70) over
INTEREST ON REVENUE BALANCES 0 (13) 13 under
FINANCING CHARGES 175 233 (58) over
TOTAL EXPENDITURE 209,759 210,507 (748) over
INCOME
MILK SUBSIDIES FROM THE E.U. (37) (46) 9 over rec
CONTRIBUTIONS FROM OTHER BODIES (5,630) (5,807) 177 over rec
SALES - GENERAL (4,696) (4,990) 294 over rec
SALES - DEPARTMENTS OF THE AUTHORITY (120) (276) 156 over rec
FEES AND CHARGES - GENERAL (9,326) (9,101) (225) under rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (9,297) (10,302) 1,005 over rec
ELECTIONS - ACCOMMODATION USE 0 (14) 14 over rec
RENTAL INCOME (395) (402) 7 over rec
FLEET SERVICES (12,562) (13,555) 993 over rec
OTHER INCOME (2,735) (2,674) (61) under rec
RECOVERY FROM CAPITAL (1,333) (795) (538) under rec
RECHARGES - DEPARTMENTS OF THE AUTHORITY (25,438) (25,022) (416) under rec
TOTAL INCOME (71,569) (72,984) 1,415 over rec
NET EXPENDITURE 138,190 137,523 667 under
89

Page 90

90

Page 91

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2024 (No 15)
Education Resources
Committee Annual Forecast Annual Annual Budget Actual Variance
Budget for Year Forecast Forecast Proportion to Period 15 31/03/24
Before Variance Variance 31/03/24 31/03/24 Before
Transfers Before After Before Transfers
Transfers Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Education 440.131 440.426 (0.295) (0.295) 440.131 439.938 0.193 under
Position Before Transfer to Reserves 440.131 440.426 (0.295) (0.295) 440.131 439.938 0.193 under
Transfers to Reserves as at 31/03/2024 0.000 0.479 (0.479) over
Position After Transfers to Reserves at 31/03/2024 440.131 440.417 (0.286) over
8
91

Page 92

Education Resources Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  (198k) over Teachers Basic / Superannuation /
National Insurance - (1,551k) over 
APT&C Basic / Superannuation /
National Insurance – 1,379k under 
Schools - (1,551k) over 
Early Years – 1,379k
under 
The overspend relates to the
increased use of supply
teachers for absence cover. 
The underspend mainly relates
to Early Years posts and is the
result of staff turnover.     
Supplies and
Services
41k under Aids for Clients – (64k) over 
Materials, Apparatus and Equipment –
(193k) over 
Pupil Equity Fund – 324k under 
Schools – (64k) over 
Schools – (193k) over 
Schools – 324k under
This overspend is due to the
increased demand and cost for
new equipment required by
children in school with complex
physical needs. 
The overspend is due to the
additional cost of per capita
expenditure reflecting the
growth in pupil numbers. 
The underspend reflects the
profile of Pupil Equity Fund
(PEF) spend and commitment
across the academic year in
line with school improvement
plans and will therefore be
carried forward to 2024/2025, to
be used in the April to June
2024 school session. 
92

Page 93

Subjective Head Variance Subjective line Service / amount Explanation
Transport and
Plant
(2,930k) over Pupil Transport - Strathclyde
Passenger Transport - (2,522k) over 
Pupil Transport – ASN and Other –
(352k) over
Schools - (2,522k) over 
Schools – (352k) over
This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs. 
This is a demand led service
and reflects the volume of
children requiring ASN transport
to school and increased costs. 
Administration
Costs
114k under Conferences – 51k under 
Training – 50k under
Schools – 51k under 
Schools – 50k under 
The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated. 
The underspend relates to
Scottish Government funding
for school support staff training
received in March 2024 of £57k.
This will be carried forward at
year end and spent in 24/25.     
93

Page 94

Subjective Head Variance Subjective line Service / amount Explanation
Payments to Other
Bodies 
175k under Payments to Other Bodies - 698k
under 
Independent School Places - (704k)
over 
Section 23 Placements with Other
Local Authorities – 300k under 
Contract Speech Therapy - (190k)
over 
Early Years - 698k
under 
Schools - (704k) over 
Schools – 300k under 
Schools - (190k) over 
The underspend is due to less
than anticipated core Early
Years spend including cross
boundary charges to other
Local Authorities. 
This overspend reflects the
increased cost of placements
for pupils with additional
support needs in Independent
Schools and is due to both an
increase in the number of
places and the cost of
placements. 
The underspend is due to a
reduction in the number of
Section 23 placements with
other Local Authorities. 
This overspend reflects
increased contract prices from
the NHS based on the current
number of sessions and the
level of service being provided. 
94

Page 95

Subjective Head Variance Subjective Line Service / amount Explanation
Payment to
Contractors
254k under Payment to Private Contractor - 254k
under
Non schools - 254k
under
The underspend relates to the
timing of savings associated
with the renewal of the
insurance arrangements within
the contract this year. 
Transfer Payments 390k under Footwear and Clothing Grants - 387k
under 
Schools - 387k under  The underspend reflects lower
than anticipated expenditure on
footwear and clothing grants
during the financial year,
reflecting current demand. 
£99k of this underspend relates
to the Early Years Footwear
and Clothing Investment which
will be carried forward at year
end. 
Income 2,336k over
recovered
Fees and Charges - Other Local
Authorities - 779k over recovered 
Early Years Fees - 1,580k over
recovered 
Schools - 779k over
recovered 
Early Years - 1,580k
over recovered
The over recovery reflects the
increase in income recovered
from other Local Authorities for
children attending schools in
South Lanarkshire. This income
is used to support the cost of
external placements. 
The over recovery in Early
Years’ fees relates to an
increased uptake of available
nursery places beyond 1140
hours. 
* The underlined variances represent new variances since the last report. 
95

Page 96

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS BASIC 182,486 180,580 1,906 under
TEACHERS OVERTIME 0 5 (5) over
TEACHERS SUPERANNUATION 41,370 41,718 (348) over
TEACHERS NI 18,924 20,485 (1,561) over
DAILY TEACHERS BASIC 1,675 3,133 (1,458) over
DAILY TEACHERS SUPERANNUATION 0 58 (58) over
DAILY TEACHERS NI 0 32 (32) over
TEACHERS TRAINING 271 286 (15) over
APT&C BASIC 73,893 71,403 2,490 under
APT&C OVERTIME 0 20 (20) over
APT&C SUPERANNUATION 13,413 13,913 (500) over
APT&C NIC 5,181 5,647 (466) over
MANUAL BASIC 0 111 (111) over
MANUAL SUPERANNUATION 0 24 (24) over
MANUAL NIC 0 10 (10) over
SESSIONAL WORK 205 186 19 under
TRAVEL AND SUBSISTANCE 160 150 10 under
OTHER EMPLOYEE COSTS 1,661 1,676 (15) over
PENSION INCREASES 459 426 33 under
PREMATURE RETIRALS 5,040 5,042 (2) over
ADDITIONAL PENSION COSTS 0 31 (31) over
EMPLOYEE COSTS 344,738 344,936 (198) over
PROPERTY COSTS
RATES 17,725 17,681 44 under
SCOTTISH WATER - UNMETERED CHARGES 0 1 (1) over
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,363 1,328 35 under
SCOTTISH WATER - METERED CHARGES 733 667 66 under
RENT 271 265 6 under
SERVICE CHARGE 40 68 (28) over
PROPERTY INSURANCE 482 493 (11) over
SECURITY COSTS 54 56 (2) over
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 2 (2) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 38 27 11 under
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 54 71 (17) over
ADAPTIONS - INTERNAL CONTRACTORS 126 155 (29) over
ELECTRICITY  - CONTRACT 8,616 8,604 12 under
GAS 4,043 4,016 27 under
HEATING OIL 164 132 32 under
SOLID FUEL 251 237 14 under
FIXTURE & FITTINGS 1 1 0
JANITOR SERVICE 110 100 10 under
JANITORIAL SUPPLIES (1) 0 (1) over
CLEANING CONTRACT 547 552 (5) over
CLEANING OUTWITH CONTRACT 5 0 5 under
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 442 600 (158) over
HEALTH & HYGIENE MATERIALS 18 18 0
WINDOW CLEANING 1 0 1 under
REFUSE UPLIFT 20 26 (6) over
REMOVAL & STORAGE COSTS 1 1 0
OTHER PROPERTY COSTS 248 252 (4) over
OFFICE ACCOM-FACILITIES MANAGEMENT 0 4 (4) over
ACCOMMODATION RECHARGE TO USERS 882 882 0
PROPERTY COSTS 36,234 36,239 (5) over
96

Page 97

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 357 317 40 under
COMPUTER EQUIPMENT MAINTENANCE (10) 0 (10) over
COMPUTER EQUIPMENT RENTAL 2 0 2 under
I.T. EQUIPMENT MAINT-CONTRACT 3,492 3,515 (23) over
I.T. ELECTRONIC MESSAGING 32 44 (12) over
EQUIPMENT, APPARATUS AND TOOLS 51 51 0
SMALL TOOLS 4 4 0
AIDS FOR CLIENTS 90 154 (64) over
ADAPTATIONS FOR CLIENTS 13 16 (3) over
SUPPLIES FOR CLIENTS 1 2 (1) over
FURNITURE - OFFICE 19 22 (3) over
FURNITURE - GENERAL 58 51 7 under
FURNISHINGS (INCL. CROCKERY & LINEN) 15 17 (2) over
MATERIALS 17 23 (6) over
MATERIALS, APPARATUS AND EQUIPMENT 3,869 4,062 (193) over
PUPIL EQUITY FUNDING 324 0 324 under
LIBRARY/RESOURCE CENTREMATERIALS 95 87 8 under
AUDIO VISUAL 21 21 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 42 42 0
TV LICENCES - EDUCATION 19 20 (1) over
SUPPORTED STUDY 0 1 (1) over
FOODSTUFFS - GENERAL 260 296 (36) over
PROTECTIVE CLOTHING & UNIFORMS 51 53 (2) over
OTHER SUPPLIES AND SERVICES 11 4 7 under
HEALTH AND SAFETY 48 48 0
CATERING - CONTRACT 2,845 2,836 9 under
CATERING - OUTWITH CONTRACT 6 3 3 under
CATERING - EXTERNAL 16 17 (1) over
ARTIST FEES / PERFORMING ARTS / ENTERTA 5 6 (1) over
DELIVERY CHARGE 6 6 0
SUPPLIES AND SERVICES 11,759 11,718 41 under
97

Page 98

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 1 1 0
POOL CAR CHARGES-RENTAL 15 22 (7) over
POOL CAR CHARGES-FUEL 1 1 0
OTHER TRANSPORT COSTS 3 4 (1) over
INSURANCE 3 3 0
FLEET SERVICE CHARGES - SCHEDULED MAINTENANCE 2 0 2 under
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 23 36 (13) over
FLEET SERVICE CHARGES - LEASING 66 66 0
FLEET SERVICE CHARGES - HIRED VEHICLES (4) 17 (21) over
FLEET SERVICE CHARGES - CONTRACT HIRE 0 4 (4) over
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 4 7 (3) over
FLEET SERVICE CHARGES - FUEL 134 118 16 under
FLEET SERVICE CHARGES - DRIVERS 1,416 1,326 90 under
FLEET SERVICE CHARGES - BUS ESCORTS 399 466 (67) over
HIRE OF EXTERNAL VEHICLES 212 257 (45) over
HIRE OF EXTERNAL PLANT 1 0 1 under
HIRE OF SKIPS 10 11 (1) over
EXTERNAL TRANSPORT CONTRACT 9 9 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 6,888 7,036 (148) over
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 7,311 9,833 (2,522) over
PUPIL TRANSPORT - OTHER 188 392 (204) over
TAXI CHARGES - CONTRACTED (2) 0 (2) over
TAXI CHARGES - AD HOC 0 1 (1) over
TRANSPORT AND PLANT 16,680 19,610 (2,930) over
ADMINISTRATION
PRINTING AND STATIONERY 699 700 (1) over
TELEPHONES 213 205 8 under
MOBILE PHONES 17 17 0
ADVERTISING - OTHER 11 5 6 under
POSTAGES/COURIERS 55 46 9 under
MEMBERSHIP FEES/SUBSCRIPTIONS 298 302 (4) over
INSURANCE 76 76 0
MEDICAL COSTS 22 23 (1) over
HOSPITALITY / CIVIC RECOGNITION 10 11 (1) over
SECURITY UPLIFT FEES 7 8 (1) over
OTHER ADMIN COSTS 7 9 (2) over
CONFERENCES - OFFICIALS (incl associated costs) 52 1 51 under
TRAINING 617 567 50 under
ADMINISTRATION 2,084 1,970 114 under
98

Page 99

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 0 32 (32) over
OTHER LOCAL AUTHORITIES 1,332 1,032 300 under
SCOTTISH QUALIFICATIONS AUTHORITY 1,563 1,563 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 4 4 0
PAYMENTS TO OTHER BODIES 19,820 19,122 698 under
INDEPENDENT SCHOOL PLACES 5,771 6,475 (704) over
CONTRACT SPEECH THERAPY 678 868 (190) over
SCHOOL ACTIVITIES 704 450 254 under
RESEARCH GRANTS - EDUCATION 43 43 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 26 15 11 under
P.E. FACILITIES 18 9 9 under
ACTIVITIES PROGRAMME 132 311 (179) over
COUNSELLING 1,431 1,437 (6) over
COPYRIGHT AGREEMENT 215 215 0
VAT FREE EXCURSIONS - EDUCATION 35 21 14 under
PRIVATE INDIVIDUALS - GENERAL 22 22 0
PAYMENT TO OTHER BODIES 31,794 31,619 175 under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 44,120 43,866 254 under
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 1 1 0
PAYMENT TO CONTRACTORS 44,121 43,867 254 under
TRANSFER PAYMENTS
EDUCATION MAINTENANCE ALLOWANCE 826 826 0
FOOTWEAR & CLOTHING GRANTS 2,273 1,886 387 under
WORK EXPERIENCE 1 (2) 3 under
TRANSFER PAYMENTS 3,100 2,710 390 under
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 3 0 3 under
I.T. EQUIPMENT LEASING - CONTRACT 379 366 13 under
FINANCING CHARGES 382 366 16 under
TOTAL EXPENDITURE 490,892 493,035 (2,143) over
99

Page 100

South Lanarkshire Council
REVISED
Education Resource - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) (165) (5) under rec
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (43,954) (43,965) 11 over rec
CONTRIBUTIONS FROM OTHER BODIES (3,877) (3,849) (28) under rec
ESF GRANT (219) (219) 0
FEES AND CHARGES - GENERAL 0 (5) 5 over rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,087) (1,866) 779 over rec
PLAYGROUP ACCOMMODATION CHARGE (10) (14) 4 over rec
EARLY YEARS FEES (410) (1,990) 1,580 over rec
RENTAL INCOME (20) (15) (5) under rec
COURSE FEES (35) (35) 0
OTHER INCOME (97) (92) (5) under rec
ACCOMMODATION INCOME FROM USERS (882) (882) 0
INCOME (50,761) (53,097) 2,336 over rec
NET EXPENDITURE 440,131 439,938 193 under
100

Page 101

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2024 (No 15)
Finance and Corporate Resources
Committee Annual Forecast Annual Annual Budget Actual Variance
Budget for Year Forecast Forecast Proportion to Period 15 31/03/24
Before Variance Variance 31/03/24 31/03/24 Before
Transfers Before After Before Transfers
Transfers Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Finance Services - Strategy 2.505 2.471 0.034 0.034 2.505 2.397 0.108 under
Finance Services - Transactions 21.980 22.161 (0.181) (0.181) 21.980 22.078 (0.098) over
Audit and Compliance Services 0.402 0.408 (0.006) (0.006) 0.402 0.414 (0.012) over
Information Technology Services 6.903 6.903 0.000 0.000 6.903 7.159 (0.256) over
Communications and Strategy Services 2.955 2.955 0.000 0.000 2.955 2.920 0.035 under
Administration and Licensing Services 4.458 4.678 (0.220) (0.220) 4.458 4.674 (0.216) over
Personnel Services 8.639 8.482 0.157 0.157 8.639 8.365 0.274 under
Position Before Transfer to Reserves 47.842 48.058 (0.216) (0.216) 47.842 48.007 (0.165) over
Transfers to Reserves as at 31/03/2024 0.000 0.000 0.000
Position After Transfers to Reserves at 31/03/2024 47.842 48.007 (0.165) over
8
101

Page 102

Finance and Corporate Resources Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  1,493k under  APT&C Basic / Superannuation / NI –
1,872k under 
Finance Services
(Transactions) – 401k
under
The underspend is due to
vacant posts within the
Service which are being
recruited in line with Service
requirements in 2024/25. 
Administration, Legal
and Licensing – (52k)
over 
This overspend relates to
lower than anticipated staff
turnover. 
Finance Services
(Strategy) – 183k under 
The underspend is due to
vacant posts within the
Service which are being
recruited in line with Service
requirements in 2024/25. 
Communications and
Strategy Services –
112k under 
The underspend is due to 
vacant posts within the 
Service. 
Personnel Services –
1,116k under 
The underspend reflects
savings made in advance for
the next financial year and
the level of turnover within
the Service to date, with
recruitment being considered
in line with service
requirements in 2024/25. 
102

Page 103

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (165k) over Other Property Costs – (181k) over Finance Services
(Transactions) – (182k)
over 
The overspend reflects
greater than budgeted spend
on Long Term Empty
Property Relief. 
Supplies and Services  (355k) over  Computer Equipment Maintenance –
(114k) over 
IT Services – (111k)
over 
The overspend relates to
one-off increases in costs for
server upgrades. This is a
non-recurring overspend. 
IT Equipment Maintenance Contract –
(175k) over 
IT Services (118k) over  The overspend reflects the
increased costs of IT
services. This is partially
offset by an over-recovery of
income via recharges to
Resources. 
Admin, Legal and
Licensing – (34k) over 
The overspend reflects the
costs of computer equipment
required for service delivery. 
Outsourced Mail – (105k) over Communications and
Strategy Services –
(82k) over
The overspend reflects a
movement from royal mail
postages to digital mail. This
is offset by an over recovery
in income. 
Administration Costs  (364k) over Medical Costs – (208k) over  Personnel Services –
(203k) over 
The overspend reflects the
level of medical referrals
during the year, which is
offset by an over-recovery of 
income via recharges to
Resources.
103

Page 104

Subjective Head Variance  Subjective line Service / amount Explanation
Administration Costs
(cont.) 
Other Admin Costs – (111k) over  Finance Services
(Transactions) – (111k) 
The overspend reflects
additional postage costs
required for service delivery;
and Graduate training costs
which are offset by Employee
Cost underspends. 
Payments to Other
Bodies 
(639k) over Grants to Voluntary Organisations –
73k under 
Administration, Legal
and Licensing – 73k
under 
The underspend relates to
less than budgeted spend on
Admin Grants. 
Payments to Other Bodies – (566k)
over 
Personnel Services
(469k) over 
The overspend relates to
spend on Employability
projects. This overspend is
being managed within the
overall Service position and is
not recurring beyond
2023/2024. 
External Audit Fees – (102k) over Finance Services
(Strategy) – (102k) over
The overspend reflects the
uplift in external audit fees. 
Transfer Payments 1,967k under Rent Allowance – 650k under 
Rent Rebates – 1,317k under
Finance Services
(Transactions) – 650k
under 
Finance Services
(Transactions) – 1,317k
under 
The underspend in these
lines reflects the demand-led
spend on Rent Allowance
and Rent Rebates and is
offset by an under-recovery
of Income (below).
104

Page 105

Subjective Head Variance  Subjective line Service / amount Explanation
Income  (2,025k)
under
recovered
Rent Rebates Subsidy – (2,320k)
under recovered 
Rent Allowance Subsidy – (827k)
under recovered 
DHP – 853k over recovered 
Fees and Charges – General – 124k
over recovered 
Reallocation of Central Support Costs
– 110k over recovered
Finance Services
(Transactions) - 
(2,320k) under
recovered. 
Finance Services
(Transactions) – (827k)
under recovered 
Finance Services
(Transactions) – 853k
over recovered 
Personnel Services –
124k over recovered 
Finance Services
(Transactions) – 94k
over recovered
The under recovery in these
lines is offset by the demand-
led underspend in Transfer
Payments (above). 
This over recovery reflects an
additional stream from
Scottish Government that is
offsetting expenditure and
income within DHP line that is
included within Rent Rebates. 
This over recovery offsets a
higher than anticipated
recharge of medical costs
(above) 
The over recovery reflects
support costs charged to
Resources at year-end being
higher than anticipated. This
is non-controllable income.
* The underlined variances represent new variances since the last report.
105

Page 106

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS BASIC 0 0 0
TEACHERS OVERTIME 0 0 0
APT & C BASIC 29,044 28,774 270 under
APT & C OVERTIME 139 211 (72) over
APT & C SUPERANNUATION 6,491 5,473 1,018 under
APT & C NIC 3,428 2,844 584 under
MANUAL BASIC 35 47 (12) over
MANUAL OVERTIME 0 1 (1) over
MANUAL SUPERANNUATION 0 1 (1) over
TRAVEL AND SUBSISTANCE 11 27 (16) over
OTHER EMPLOYEE COSTS 228 341 (113) over
PENSION INCREASES 846 982 (136) over
ADDITIONAL PENSION COSTS 0 28 (28) over
EMPLOYEE COSTS 40,222 38,729 1,493 under
PROPERTY COSTS
RATES 42 18 24 under
SCOTTISH WATER - METERED CHARGES 0 1 (1) over
RENT 27 47 (20) over
SERVICE CHARGE 1 4 (3) over
PROPERTY INSURANCE 1 1 0
SECURITY COSTS 128 136 (8) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRATOR 0 2 (2) over
ELECTRICITY  - CONTRACT 13 16 (3) over
GAS 1 0 1 under
FIXTURE & FITTINGS 1,852 1,824 28 under
OTHER PROPERTY COSTS 2,196 2,377 (181) over
PROPERTY COSTS 4,261 4,426 (165) over
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 5,121 5,153 (32) over
COMPUTER EQUIPMENT MAINTENANCE 1,790 1,904 (114) over
I.T. EQUIPMENT MAINT - CONTRACT 582 757 (175) over
I.T. ELECTRONIC MESSAGING 43 3 40 under
EQUIPMENT, APPARATUS AND TOOLS 159 160 (1) over
SMALL TOOLS 0 2 (2) over
ADAPTATIONS FOR CLIENTS 0 1 (1) over
SUPPLIES FOR CLIENTS 221 229 (8) over
FURNITURE - OFFICE 10 11 (1) over
FURNITURE - GENERAL 0 2 (2) over
MATERIALS 112 94 18 under
MATERIALS, APPARATUS AND EQUIPMENT 0 2 (2) over
AUDIO VISUAL 0 1 (1) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 7 0 7 under
FOODSTUFFS - GENERAL 25 15 10 under
PROTECTIVE CLOTHING & UNIFORMS 4 2 2 under
OTHER SUPPLIES AND SERVICES 117 109 8 under
HEALTH AND SAFETY 0 1 (1) over
CATERING - OUTWITH CONTRACT 6 1 5 under
OUTSOURCED MAIL 144 249 (105) over
SUPPLIES AND SERVICES 8,341 8,696 (355) over
106

Page 107

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
TRANSPORT AND PLANT
POOL CAR CHARGES - RENTAL 23 7 16 under
POOL CAR CHARGES - FUEL 4 0 4 under
OTHER TRANSPORT COSTS 1 1 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 1 2 (1) over
FLEET SERVICE CHARGES - LEASING 1 4 (3) over
FLEET SERVICE CHARGES - FUEL 1 1 0
FLEET SERVICE CHARGES - DRIVERS 36 39 (3) over
TRANSPORT AND PLANT 67 54 13 under
ADMINISTRATION
PRINTING AND STATIONERY 538 555 (17) over
TELEPHONES 1,424 1,368 56 under
MOBILE PHONES 179 189 (10) over
ADVERTISING - RECRUITMENT 21 55 (34) over
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 1 under
ADVERTISING - OTHER 123 102 21 under
POSTAGES/COURIERS 965 976 (11) over
SMS MESSAGING 10 6 4 under
MEMBERSHIP FEES/SUBSCRIPTIONS 223 230 (7) over
INSURANCE 140 140 0
MEDICAL COSTS 135 343 (208) over
LEGAL EXPENSES 168 236 (68) over
HOSPITALITY / CIVIC RECOGNITION 36 22 14 under
PAYPOINT AGENCY FEES 70 77 (7) over
SECURITY UPLIFT FEES 2 2 0
OTHER ADMIN COSTS 1,315 1,426 (111) over
MEMBERS ALLOWANCES 1,860 1,857 3 under
CONFERENCES - MEMBERS (incl associated costs) 24 40 (16) over
CONFERENCES - OFFICIALS (incl associated costs) 11 2 9 under
TRAINING 858 806 52 under
VOLUNTEERS' EXPENSES 0 77 (77) over
INTERNAL SUPPORT SERVICES ALLOCATION 42 0 42 under
ADMINISTRATION 8,145 8,509 (364) over
PAYMENT TO OTHER BODIES
MANAGEMENT AND TECHNOLOGY TRAINING GRANT 91 91 0
YOUTH EMPLOYMENT TRAINING INITIATIVE 196 196 0
GRANTS TO VOLUNTARY ORGANISATIONS 619 546 73 under
PAYMENTS TO VOLUNTARY ORGANISATIONS 35 80 (45) over
PAYMENTS TO OTHER BODIES 7,421 7,987 (566) over
EXTERNAL AUDIT FEES 516 618 (102) over
ACTIVITIES PROGRAMME 10 13 (3) over
PRIVATE INDIVIDUALS - GENERAL 10 6 4 under
PAYMENT TO OTHER BODIES 8,898 9,537 (639) over
107

Page 108

REVISED
Finance & Corporate Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 167 152 15 under
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 231 232 (1) over
PAYMENT TO CONTRACTORS 398 384 14 under
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 22,931 650 under
RENT REBATES 42,184 40,867 1,317 under
TRANSFER PAYMENTS 65,765 63,798 1,967 under
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 1 0 1 under
I.T. EQUIPMENT LEASING-CONTRACT 1,179 1,284 (105) over
FINANCING CHARGES 1,180 1,284 (104) over
TOTAL EXPENDITURE 137,277 135,417 1,860 under
INCOME
STATUTORY ADDITIONS - COST OF COLLECTION (1,007) (1,007) 0
RENT REBATES SUBSIDY (37,491) (35,171) (2,320) under rec
RENT ALLOWANCE SUBSIDY (23,296) (22,469) (827) under rec
DWP SUBSIDY (1,200) (1,195) (5) under rec
DHP (283) (1,136) 853 over rec
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (194) (198) 4 over rec
CONTRIBUTIONS FROM OTHER BODIES (2,416) (2,417) 1 over rec
ESF GRANT (105) (115) 10 over rec
SALES - DEPARTMENTS OF THE AUTHORITY (32) (17) (15) under rec
FEES AND CHARGES - GENERAL (4,211) (4,335) 124 over rec
CHARGES TO HEALTH BOARDS (38) (45) 7 over rec
FEES AND CHARGES - OTHER BODIES (221) (236) 15 over rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,782) (2,802) 20 over rec
RENTAL INCOME (2) 0 (2) under rec
HOME LOANS REPAYMENTS 0 (5) 5 over rec
BIRTH REGISTRATION (18) (18) 0
DEATH REGISTRATION (57) (71) 14 over rec
MARRIAGE STATUTORY FEES (120) (100) (20) under rec
EXTRACT ISSUE (105) (89) (16) under rec
MARRIAGES (54) (46) (8) under rec
CITIZENSHIP CEREMONIES (10) (11) 1 over rec
CIVIL PARTNERSHIPS 0 (1) 1 over rec
COMMITMENT CEREMONIES 0 (1) 1 over rec
OTHER INCOME (9,004) (9,026) 22 over rec
REALLOCATION OF CENTRAL SUPPORT COSTS (6,764) (6,874) 110 over rec
REALLOCATION OF SUPPORT COSTS (25) (25) 0
INCOME (89,435) (87,410) (2,025) under rec
NET EXPENDITURE 47,842 48,007 (165) over
108

Page 109

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2024 (No 15)
Housing and Technical Resources
Committee Annual Forecast Annual Annual Budget Actual Variance
Budget for Year Forecast Forecast Proportion to Period 15 31/03/24
Before Variance Variance 31/03/24 31/03/24 Before
Transfers Before After Before Transfers
Transfers Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Housing Services 10.240 8.684 1.556 0.071 10.240 8.683 1.557 under
Property Services 7.703 7.749 (0.046) (0.071) 7.703 7.753 (0.050) over
Position Before Transfer to Reserves 17.943 16.433 1.510 0.000 17.943 16.436 1.507 under
Transfers to Reserves as at 31/03/2024 0.000 1.510 (1.510) over
Position After Transfers to Reserves at 31/03/2024 17.943 17.946 (0.003) over
8
109

Page 110

Housing and Technical Resources (excl HRA) Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 2,088k
under
APT&C Basic / Overtime /
Superannuation / National Insurance
– 2,843k under
Property Services -
2,723k under 
The variance relates to
vacancies which are actively
being recruited in line with
Service requirements in
2024/25. 
Manual Basic / Overtime /
Superannuation / National Insurance -
(714k) over 
Property Services -
(668k) over
The variance reflects the
current level of trade operatives
and overtime required to meet
service demands.  
Property Costs (1,989k)
over
Service Charge - (322k) over 
Other Accommodation Costs – (191k)
over 
Bed and Breakfast - (113k) over 
Property Services -
(304k) over 
Housing Services –
(191) over 
Housing Services –
(113k) over
The overspend relates to the
cost of shopping centre service
charges which are not
recoverable from tenants. 
The overspend relates to an
increase in homelessness stock
expenditure. 
The overspend relates to
greater than anticipated
demand for the service.  
Repairs and Maintenance - Internal /
External Contractor/ Life Cycle
Maintenance - (636k) over
Property Services -
(397k) over 
The overspend relates to
additional expenditure in
property maintenance and
estates services. 
Housing Services –
(239k) over 
The overspend relates to
additional expenditure in
homelessness. 
110

Page 111

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Electricity - Contract – (274k) over  Property Services – 
(257k) over
This relates to the current
market prices for utilities which
is higher than budget. 
Fixtures & Fittings – (286k) over  Housing Services –
(286k) over 
This relates to the furniture
costs within homeless
temporary accommodation and
is demand led. 
Refuse Uplift – (89k) over  Property Services – 
(82k) over
The level of uplifts varies
depending on the current
workload demands and timing
of capital and revenue works. 
Supplies and
Services 
1,365 under Computer Equipment Purchase –
(76k) over 
IT Maintenance Contract – 120k
under 
Adaptations for Clients – 81k under 
Property Services – 
(89k) over 
Property Services – 
113k under 
Property Services –
82k under 
The overspend relates to
greater than budgeted
expenditure on IT systems
within Building services. 
The cost of the IT systems
within Property Services were
lower than anticipated reflecting
the age of the current system. A
new system is under 
development. 
The underspend is due to lower
than anticipated charges from
Building Services for Social
Work adaptations. 
111

Page 112

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont) 
Materials/ Stock & Store Issues –
1,137k under 
Property Services –
1,137 under 
Expenditure on materials varies
depending on the current
workload demands and timing
of works on a wide variety of
capital and revenue works. 
Transport & Plant  412k under Pool Car Recharges (rental/fuel) –
83k under 
Fleet Service Charges - Vehicle
Maintenance – (370k) over 
Fleet Service Charges – Leasing
Charges/Hired Vehicles – 116k under 
Hire of External Plant – 182k under 
Hire of Scaffolding – 395k under 
Property Services –
80k under 
Property Services -
(359k) over 
Property Services –
133k under 
Property Services –
182k under 
Property Services –
395k under 
The underspend relates to
lower than budgeted pool car
charges within the Estates team
due to a reduction in pool car
demand. 
The costs for maintaining
vehicles have been higher than
budgeted levels. 
The underspend relates mainly
to lower than budgeted leasing
charges within Building
Services due to lower than
anticipated charges. 
Expenditure on hire of plant
varies depending on the current
workload demands and timing
of works on a wide variety of
capital and revenue works. 
Expenditure on hires varies
depending on the workload
demands and timing of works
on a wide variety of capital and
revenue works.
112

Page 113

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs
(155k) over Membership Fees – (78k) over  Property Services –
(77k) over 
This relates to the purchase of
membership and subscriptions
for architects.     
Insurance – (105k) over Property Services –
(94k) over 
This overspend is due to
greater than budgeted
insurance charges within
Property Services.
Payment to Other
Bodies
72k under   Other Committees of the Authority –
82k under 
Payment to Other Bodies – 207k
under 
Assistance to Home Owners – (260k)
over
Housing Services –
137k under 
Property Services –
(55k) over 
Property Services –
122k under 
Housing Services –
85k under 
Property Services –
(260k) over 
The underspend is due to a
lower than anticipated
contribution to Homelessness
within the Vulnerable Persons
Resettlement Scheme as a
result of the number of cases in
the financial year. 
This relates to building services
with internal support charges
for plant store being slightly
higher than budgeted. 
This mainly relates to the costs
in relation to care and repair
advice and support which was
lower than anticipated. 
The variance is due to lower
than anticipated homelessness
contract payments. 
This variance reflects the timing
of spend on grants to owners to
date.
113

Page 114

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors 
507k over Payments to Private Contractors –
(312k) over 
Property Services –
(532k) over 
Housing Services –
220k under 
Expenditure on contractor
payments varies depending on
the current workload demands
and timing of works on a wide
variety of capital and revenue
works. 
The underspend relates to
commissioned services in the
Homelessness budget where
expenditure varies according to
service requirements. 
Payment to External Consultants –
(188k) over 
Property Services –
(188k) over
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet current service demands. 
Income 251k over
recovered
Contribution from Other Bodies –
1,709k over recovered 
Rental Income – (136k) under
recovered
Housing Services –
1,709k over recovered 
Property Services –
(136k) under recovered
The over recovery mainly
relates to Scottish Government
funding for Ukraine refugee
resettlement, which has been
transferred to reserves at year-
end as per Executive
Committee (26 June 2024). 
The under recovery relates to
the shopping centre income
which is lower than budgeted
due to vacant units. 
114

Page 115

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont)  House Rents – 161k over recovered 
Other Income – (412k) under
recovered 
Recovery from Capital / Recharges -
Departments of the Authority/ Manual
Recharges – Departments of
Authority – (1,198k) under recovered 
Housing Services –
161k over recovered 
Property Services -
(295k) under recovered 
Housing Services –
(117k) under recovered 
Property Services –
(1,198k) under
recovered 
The over recovery relates to
greater house rent income than
budgeted due to an increase in
homeless properties. 
This mainly relates to building
services income streams which
are variable each financial year. 
The under recovery relates to
lower than anticipated income
from Supporting people within
the Homelessness section. 
The level of income recovered
varies depending on the current
workload and the timing of a
wide variety of projects and is
offset by a reduction in
expenditure. 
* The underlined variances represent new variances since the last report. 
115

Page 116

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 2023/24 TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 17,378 15,034 2,041 under
APT & C OVERTIME 203 159 43 under
APT & C SUPERANNUATION 3,333 2,766 509 under
APT & C NIC 1,813 1,531 250 under
MANUAL BASIC 19,842 20,108 37 under
MANUAL OVERTIME 588 1,370 (782) over
MANUAL SUPERANNUATION 3,820 3,726 152 under
MANUAL NIC 2,008 2,160 (121) over
TRAVEL AND SUBSISTANCE 25 15 10 under
OTHER EMPLOYEE COSTS 645 661 (14) over
PENSION INCREASES 602 635 (33) over
ADDITIONAL PENSION COSTS 13 17 (4) over
EMPLOYEE COSTS 50,270 48,182 2,088 under
116

Page 117

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 2023/24 TO DATE AMOUNT Under
PROPERTY COSTS
RATES 2,254 2,212 42 under
SCOTTISH WATER - UNMETERED CHARGES 12 15 (3) over
SCOTTISH WATER - METERED CHARGES 241 291 (50) over
RENT 1,808 1,843 (35) over
SERVICE CHARGE 439 761 (322) over
FACTORING CHARGES 9 0 9 under
OTHER ACCOMMODATION COSTS 2,579 2,770 (191) over
BED AND BREAKFAST 27 140 (113) over
PROPERTY INSURANCE 379 386 (8) over
SECURITY COSTS 299 257 42 under
GROUND MAINTENANCE 52 57 (5) over
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 6 4 under
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 2,882 3,473 (591) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 0 3 (3) over
LIFE CYCLE MAINTENANCE 6,136 5,481 655 under
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 423 1,120 (697) over
ADAPTIONS - INTERNAL CONTRACTORS 0 14 (14) over
HOUSING - RENT FREE ACCOMMODATION 0 13 (13) over
GAS MAINTENANCE COSTS 0 1 (1) over
HOUSING - RENT W/O UNLET PERIODS 738 815 (77) over
HOUSING - RENT W/O BAD PERIODS 778 852 (74) over
FIXED ELECTRICAL 0 1 (1) over
EPC 0 1 (1) over
BOILER PLANT SERVICING 0 1 (1) over
ELECTRICITY  - CONTRACT 1,447 1,722 (274) over
ELECTRICITY  - NON CONTRACT 29 12 17 under
GAS 575 517 58 under
HEATING OIL 11 17 (6) over
FIXTURE & FITTINGS 876 1,162 (286) over
JANITOR SERVICE 164 153 11 under
CLEANING CONTRACT 407 410 (3) over
CLEANING MATERIALS 10 6 4 under
WINDOW CLEANING 2 1 1 under
PEST CONTROL 6 17 (11) over
REFUSE UPLIFT 404 493 (89) over
REMOVAL & STORAGE COSTS 51 24 27 under
OTHER PROPERTY COSTS 556 543 13 under
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 1,103 10 under
ACCOMMODATION RECHARGE TO USERS 33 46 (13) over
PROPERTY COSTS 24,750 26,739 (1,989) over
117

Page 118

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 2023/24 TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 472 548 (76) over
COMPUTER EQUIPMENT MAINTENANCE 7 0 7 under
I.T. EQUIPMENT MAINT-CONTRACT 209 89 120 under
EQUIPMENT, APPARATUS AND TOOLS 45 7 38 under
SMALL TOOLS 0 1 (1) over
ADAPTATIONS FOR CLIENTS 500 419 81 under
FURNITURE - OFFICE 0 3 (3) over
MATERIALS 12,329 5,279 7,050 under
STOCK/STORE ISSUES 0 5,913 (5,913) over
MATERIALS, APPARATUS AND EQUIPMENT 0 1 (1) over
AUDIO VISUAL 10 8 2 under
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 under
TV LICENCES - EDUCATION 1 1 0 -
FOODSTUFFS - GENERAL 2 (6) 8 under
PROTECTIVE CLOTHING & UNIFORMS 44 35 9 under
OTHER SUPPLIES AND SERVICES 278 214 64 under
HEALTH AND SAFETY 1 2 (1) over
CATERING - CONTRACT 1 0 1 under
MAJOR SUPPLY OF ELECTRICAL POWER 0 1 (1) over
OUTSOURCED MAIL 0 22 (22) over
DELIVERY CHARGE 0 1 (1) over
BULK BUYING DISCOUNT 0 (2) 2 under
SUPPLIES AND SERVICES 13,901 12,536 1,365 under
118

Page 119

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 2023/24 TO DATE AMOUNT Under
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 2 (2) over
PURCHASE OF PLANT 125 133 (8) over
FLEET SERVICES - FUEL 1 8 (7) over
FLEET SERVICES - VEHICLE HIRE 36 36 0 -
POOL CAR RECHARGE - RENTAL CHARGE 97 40 57 under
POOL CAR RECHARGE - FUEL 26 0 26 under
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 1 0 -
OTHER TRANSPORT COSTS 1 11 (10) over
TRANSPORT INSURANCE 44 67 (23) over
LICENCES 1 1 0 -
PLANT SERVICES 7 39 (32) over
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 329 699 (370) over
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 1 under
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 10 (3) over
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 3 12 under
FLEET SERVICE CHARGES LEASING 1,397 1,236 161 under
FLEET SERVICE CHARGES HIRED VEHICLES 202 247 (45) over
FLEET SERVICE CHARGES CONTRACT HIRE 53 26 27 under
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 117 194 (77) over
FLEET SERVICE CHARGES FUEL 842 747 95 under
HIRE OF EXTERNAL VEHICLES 6 6 0 -
HIRE OF EXTERNAL PLANT 257 75 182 under
HIRE OF SCAFOLDING 1,077 682 395 under
HIRE OF SKIPS 33 0 33 under
EXTERNAL TRANSPORT CONTRACT 40 47 (7) over
TAXI CHARGES - CONTRACTED 29 22 7 under
TRANSPORT AND PLANT 4,744 4,332 412 under
ADMINISTRATION
PRINTING AND STATIONERY 83 84 (1) over
TELEPHONES 93 44 49 under
MOBILE PHONES 50 36 14 under
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 7 4 3 under
ADVERTISING - OTHER 6 1 5 under
POSTAGES/COURIERS 21 34 (13) over
MEMBERSHIP FEES/SUBSCRIPTIONS 13 91 (78) over
INSURANCE 216 321 (105) over
MEDICAL COSTS 16 35 (19) over
LEGAL EXPENSES 16 19 (3) over
PETTY OUTLAYS 12 13 (1) over
HOSPITALITY / CIVIC RECOGNITION 2 5 (3) over
PAYPOINT AGENCY FEES 0 5 (5) over
OTHER ADMIN COSTS 13 6 7 under
TRAINING 0 4 (4) over
INTERNAL SUPPORT SERVICES ALLOCATION 457 458 (1) over
CENTRAL ADMINISTRATION 2,895 2,895 0 -
ADMINISTRATION 3,900 4,055 (155) over
119

Page 120

South Lanarkshire Council
REVISED
Housing & Technical Resources - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 2023/24 TO DATE AMOUNT Under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,523 2,441 82 under
PAYMENTS TO OTHER BODIES 1,186 979 207 under
SUPPORTING PEOPLE INTERNAL PROVIDER 1,130 1,212 (82) over
SUPPORTING PEOPLE EXTERNAL PROVIDER 732 608 124 under
HOUSING ADMINISTRATION 885 885 0 -
ASSISTANCE TO HOME OWNERS 1,982 2,242 (260) over
PRIVATE INDIVIDUALS - GENERAL 155 154 1 under
PAYMENT TO OTHER BODIES 8,593 8,521 72 under
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 0 7 (7) over
PAYMENT TO PRIVATE CONTRACTOR 12,484 12,796 (312) over
PAYMENT TO EXTERNAL CONSULTANTS 381 569 (188) over
PAYMENT TO CONTRACTORS 12,865 13,372 (507) over
TRUST FUND EXPENDITURE 0 0 0 -
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 152 184 (32) over
INTEREST ON REVENUE BALANCES 2 0 2 under
FINANCING CHARGES 154 184 (30) over
TOTAL EXPENDITURE 119,177 117,921 1,256 under
INCOME
CONTRIBUTIONS FROM OTHER BODIES (1,126) (2,835) 1,709 over rec
SALES - DEPARTMENTS OF THE AUTHORITY (460) (431) (29) under rec
FEES AND CHARGES - GENERAL (580) (693) 113 over rec
FEES AND CHARGES - DEPARTMENTS OF THE A (48) (46) (2) under rec
RENTAL INCOME (4,775) (4,639) (136) under rec
HOUSE RENTS (6,153) (6,314) 161 over rec
OTHER INCOME (8,454) (8,042) (412) under rec
REALLOCATION OF CENTRAL SUPPORT COSTS (937) (1,046) 109 over rec
REALLOCATION OF SUPPORT COSTS (1,541) (1,477) (64) under rec
RECOVERY FROM CAPITAL (33,368) (28,135) (5,233) under rec
RECHARGES - DEPARTMENTS OF AUTHORITY (43,792) (44,853) 1,061 over rec
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 (2,974) 2,974 over rec
INCOME (101,234) (101,485) 251 over rec
NET EXPENDITURE 17,943 16,436 1,507 under
120

Page 121

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (6,040k)
over
Repairs and Maintenance – Internal
and External Contractor – (6,135k)
over 
HRA The overspend reflects the
current demand for repairs and
continuing high cost and
volume of voids. The position
includes a recharge for
recovery of costs from
chargeable services. 
Housing – Rent Write off Unlet
Periods/Bad Periods – 158k under 
Fixtures & Fittings – (114k) over
HRA 
HRA
The net underspend reflects a
lower than anticipated level of
bad debt provision. During the
year collection rates for rental
income have been better than
forecast, which is due in part to
schemes such as the tenancy
sustainment fund mitigating the
overall level of debt. 
This budget is demand led and
the overspend reflects the
increased demand during the
year. 
Supplies and
Services 
(296k) over Computer Equipment
Purchase/Rental/Maintenance –
(193k) over 
HRA  This reflects a change to the
timing of the new IT system
under development and the
costs to support existing IT
systems. 
8
121

Page 122

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
IT Equipment Maintenance Contract –
(47k) over 
HRA This reflects a change to the
timing of the new IT system
under development and the
costs to support existing IT
systems. 
Payments to Other
Bodies
(7,144k)
over
Other Committees of the Authority –
(7,148k) over
HRA The overspend is due to the
release of HRA surplus to the
General Fund from reduced
CFCR requirement in the
financial year (see below). 
Financing Charges 16,785k
under
Interest – Debt Charges – 8,249k
under 
CFCR – 7,116k under 
Interest on Revenue Balances –
1,661k under 
HRA The overall level of debt charge
was lower than anticipated due
to the profile of funding
requirements. 
The underspend is due to the
reduced CFCR requirement in
the financial year from the use
of general capital grant to fund
the 2023/24 Housing Capital
Programme. 
The level of interest received
reflects the level of balances
and interest rates being higher
than anticipated. 
122

Page 123

Subjective Head Variance  Subjective line Service / amount Explanation
Income (3,129k)
under
recovered
House Rents – 846k over recovered  HRA  The over recovery is due to the
timing of new builds which
completed ahead of the
anticipated profiles. 
Insurance Recoveries – 969k over
recovered
HRA This over recovery reflects an
increase in the level of
insurable repairs carried out
along with the recovery of the
severe weather insurance
claim. 
Other Income – (134k) under
recovered 
HRA Closure of Lindsay House has
reduced income.  This is offset
with lower expenditure.  
Year End Transfer from the Balance
Sheet – (5,267k) under recovered
HRA  The budget assumes a level of
transfer from reserves, due to
the current net underspend
across the service. This is
mainly as a result of the before
mentioned recovery of costs
from chargeable services. 
* The underlined variances represent new variances since the last report.
123

Page 124

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 TO DATE AMOUNT Under
EMPLOYEE COSTS
APT & C BASIC 11,776 11,750 26 under
APT & C OVERTIME 78 102 (24) over
APT & C SUPERANNUATION 2,097 2,133 (36) over
APT & C NIC 1,120 1,081 39 under
MANUAL BASIC 0 4 (4) over
TRAVEL AND SUBSISTANCE 28 6 22 under
OTHER EMPLOYEE COSTS 0 63 (63) over
PENSION INCREASES 211 224 (13) over
REDUNDANCY 0 6 (6) over
EMPLOYEE COSTS 15,310 15,369 (59) over
PROPERTY COSTS
RATES 105 68 37 under
SCOTTISH WATER - UNMETERED CHARGES 4 0 4 under
SCOTTISH WATER - METERED CHARGES 8 19 (11) over
RENT 6 0 6 under
SERVICE CHARGE 65 117 (52) over
OTHER ACCOMMODATION COSTS 31 0 31 under
PROPERTY INSURANCE 1,484 1,485 (1) over
SECURITY COSTS 55 4 51 under
GROUND MAINTENANCE 4,465 4,360 105 under
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 1 (1) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 34,277 40,389 (6,112) over
LIFE CYCLE MAINTENANCE 0 95 (95) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 900 (23) over
HOUSING - RENT FREE ACCOMMODATION 155 248 (93) over
HOUSING - RENT W/O UNLET PERIODS 2,445 2,899 (454) over
HOUSING - RENT W/O BAD PERIODS 2,470 1,858 612 under
ASBESTOS 139 81 58 under
FIXED ELECTRICAL 0 2 (2) over
EPC 0 2 (2) over
ELECTRICITY  - CONTRACT 1,358 1,411 (53) over
GAS 436 415 21 under
HEATING OIL 54 39 15 under
SOLID FUEL 3 0 3 under
FIXTURE & FITTINGS 58 172 (114) over
JANITOR SERVICE 74 30 44 under
CLEANING CONTRACT 468 469 (1) over
CLEANING MATERIALS 60 26 34 under
WINDOW CLEANING 16 11 5 under
PEST CONTROL 122 141 (19) over
REFUSE UPLIFT 0 39 (39) over
REMOVAL & STORAGE COSTS 14 14 0 -
OTHER PROPERTY COSTS 33 27 6 under
PROPERTY COSTS 49,282 55,322 (6,040) over
124

Page 125

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 TO DATE AMOUNT Under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 473 631 (158) over
COMPUTER EQUIPMENT RENTAL 0 24 (24) over
COMPUTER EQUIPMENT MAINTENANCE 0 11 (11) over
I.T. EQUIPMENT MAINT-CONTRACT 75 122 (47) over
I.T. ELECTRONIC MESSAGING 0 5 (5) over
EQUIPMENT, APPARATUS AND TOOLS 13 12 1 under
FURNITURE - OFFICE 10 8 2 under
FURNITURE - GENERAL 0 1 (1) over
MATERIALS 0 6 (6) over
MATERIALS, APPARATUS AND EQUIPMENT 0 4 (4) over
FOODSTUFFS - GENERAL 6 25 (19) over
PROTECTIVE CLOTHING & UNIFORMS 12 7 5 under
LAUNDRY COSTS 16 15 1 under
OTHER SUPPLIES AND SERVICES 33 44 (11) over
HEALTH AND SAFETY 15 9 6 under
CATERING - CONTRACT 0 1 (1) over
OUTSOURCED MAIL 0 24 (24) over
SUPPLIES AND SERVICES 653 949 (296) over
TRANSPORT AND PLANT
POOL CAR RECHARGE - RENTAL CHARGE 26 11 15 under
POOL CAR RECHARGE - FUEL 6 0 6 under
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 under
OTHER TRANSPORT COSTS 0 10 (10) over
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 23 31 (8) over
FLEET SERVICE CHARGES LEASING 72 62 10 under
FLEET SERVICE CHARGES HIRED VEHICLES 34 0 34 under
FLEET SERVICE CHARGES CONTRACT HIRE 0 14 (14) over
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 8 11 (3) over
FLEET SERVICE CHARGES FUEL 22 15 7 under
HIRE OF SCAFOLDING 0 19 (19) over
STORAGE 4 0 4 under
TRANSPORT AND PLANT 196 173 23 under
125

Page 126

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 TO DATE AMOUNT Under
ADMINISTRATION
PRINTING AND STATIONERY 61 75 (14) over
BULK PRINTING 52 85 (33) over
TELEPHONES 73 80 (7) over
MOBILE PHONES 27 25 2 under
ADVERTISING - OTHER 12 0 12 under
POSTAGES/COURIERS 132 145 (13) over
SMS MESSAGING 0 6 (6) over
MEMBERSHIP FEES/SUBSCRIPTIONS 38 58 (20) over
MEDICAL COSTS 25 32 (7) over
LEGAL EXPENSES 61 60 1 under
PETTY OUTLAYS 4 1 3 under
HOSPITALITY / CIVIC RECOGNITION 0 8 (8) over
GIRO BANK AGENCY FEES 9 0 9 under
PAYPOINT AGENCY FEES 28 37 (9) over
INTERNET AGENCY FEES 6 0 6 under
OTHER ADMIN COSTS 15 30 (15) over
CONFERENCES - OFFICIALS 7 2 5 under
INTERNAL SUPPORT SERVICES ALLOCATION 5,020 5,019 1 under
ADMINISTRATION 5,570 5,663 (93) over
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,909 10,057 (7,148) over
GRANTS TO VOLUNTARY ORGANISATIONS 2 0 2 under
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 35 (4) over
PAYMENTS TO OTHER BODIES 32 26 6 under
PRIVATE INDIVIDUALS - GENERAL 147 147 0 -
PAYMENT TO OTHER BODIES 3,121 10,265 (7,144) over
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 80 81 (1) over
PAYMENT TO EXTERNAL CONSULTANTS 20 66 (46) over
PAYMENT TO CONTRACTORS 100 147 (47) over
126

Page 127

South Lanarkshire Council
REVISED
Housing & Technical Resources - HRA ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/24 TO DATE AMOUNT Under
FINANCING CHARGES
PRINCIPAL-DEBT CHARGES 0 5 (5) over
INTEREST-DEBT CHARGES 17,953 9,704 8,249 under
EXPENSES-DEBT CHARGES 0 171 (171) over
I.T. EQUIPMENT LEASING-CONTRACT 67 132 (65) over
CFCR 27,162 20,046 7,116 under
INTEREST ON REVENUE BALANCES (67) (1,728) 1,661 under
FINANCING CHARGES 45,115 28,330 16,785 under
TOTAL EXPENDITURE 119,347 116,218 3,129 under
INCOME
SPECIFIC GRANT 0 (10) 10 over rec
CONTRIBUTIONS FROM OTHER BODIES 0 (38) 38 over rec
SALES - DEPARTMENTS OF THE AUTHORITY (885) (1,128) 243 over rec
FEES AND CHARGES - GENERAL (3,047) (3,323) 276 over rec
RENTAL INCOME (449) (471) 22 over rec
HOUSE RENTS (104,668) (105,514) 846 over rec
LOCK UP RENTS (2,679) (2,627) (52) under rec
INSURANCE RECOVERIES (250) (1,219) 969 over rec
OTHER INCOME (1,745) (1,611) (134) under rec
REALLOCATION OF SUPPORT COSTS (717) (619) (98) under rec
RECOVERY FROM CAPITAL 0 22 (22) under rec
TMC BALANCE TO BAL SHEET 0 (40) 40 over rec
YEAR END T/FER TO BALANCE SHEET (4,907) 360 (5,267) under rec
INCOME (119,347) (116,218) (3,129) under rec
NET EXPENDITURE 0 0 0 -
127

Page 128

128

Page 129

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2024 (No 15)
Social Work Resources
Committee Annual Forecast Annual Annual Budget Actual Variance
Budget for Year Forecast Forecast Proportion to Period 15 31/03/24
Before Variance Variance 31/03/24 31/03/24 Before
Transfers Before After Before Transfers
Transfers Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Performance and Support Services 6.395 6.210 0.185 0.185 6.395 6.062 0.333 under
Children and Families 46.692 46.982 (0.290) (0.290) 46.692 47.160 (0.468) over
Adults and Older People 182.657 182.657 0.000 0.000 182.657 182.657 0.000 under
Justice and Substance Misuse 1.466 1.361 0.105 0.105 1.466 1.331 0.135 under
Position Before Transfer to Reserves 237.210 237.210 0.000 0.000 237.210 237.210 0.000
Transfers to Reserves as at 31/03/2024 0.000 0.000 0.000
Position After Transfers to Reserves at 31/03/2024 237.210 237.210 0.000
8
129

Page 130

Social Work Resources Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  (1,786k) over  Admin & Clerical Staff – 546k under  Performance and
Support – 328k under 
The underspends relate to 
staffing vacancies which are
being filled in 2024/25. 
Adult and Older People
– 147k under 
This underspend relates to
Scheduling Assistant
vacancies in Homecare,
which are being recruited in
2024/25. This is offset by
overtime costs in Managerial
Support Specialist Staff
(below). 
Managerial Support Specialist Staff -
(1,296k) over 
Performance and
Support – (64k) over 
This overspend is a result of
turnover being less than
anticipated to date. 
Children and Families –
(153k) over 
This overspend is a result of
turnover being less than
anticipated. 
Adult and Older People
– (1,210) over 
This overspend is a result of
turnover being less than
anticipated to date, and
overtime spend to cover the
Scheduling Assistant
vacancies in Homecare. 
Justice – 131k under  This is a result of vacancies
which are actively being
recruited in 2024/25. 
130

Page 131

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Basic Grade Social Workers – 1,754k
under 
Children and Families 
- 1,422k under 
This is a result of vacancies
which are actively being
recruited in 2024/25. 
Adult and Older People
– 246k under 
This is a result of vacancies
which are actively being
recruited in 2024/25. 
Justice – 87k under  This is a result of vacancies
which are actively being
recruited in 2024/25. 
Hospital Social Workers – (169k) over  Adult and Older People
– (169k) over 
This overspend is due to
additional posts being filled to
meet demand within the
hospital discharge team and
is offset by the underspend in
Social Workers. 
Instructors – 153k under  Adult and Older People
– 153k under 
This is a result of vacancies
which are being actively
recruited in 2024/25. 
Care Staff – 126k under  Children and Families –
(369k) over 
This overspend is due to the
level of overtime being
incurred to manage staff
absences due to sickness,
maternity leave etc. 
Adult and Older People
– 495k under 
This is a result of vacancies
which are actively being
recruited in 2024/25. 
131

Page 132

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Other Employee Costs – 66k under  Children and Families –
113k under 
The underspend reflects the
recruitment of staff funded
from the Whole Family
Wellbeing Fund.  Recruitment
is now complete. 
Adult and Older People
– (101k) over 
This overspend is in relation
to agency staff and is offset
by an underspend in Social
Workers. 
Additional Pension Costs – (88k) over  Adult and Older People
– (83k) over 
This overspend is attributable
to payments in lieu of notice /
ill health retirals and is offset
by underspends in basic pay. 
Property Costs 236k under Repairs & Maintenance – Internal
Contractors – (118k) over 
Adult and Older People
– (91k) over 
This planned overspend
relates to refurbishment
works to reduce floor
capacity. 
Gas - 155k under  Adult and Older People
– 153k under 
The underspend reflects a
reduction in consumption and
price. 
Cleaning & Janitorial Supplies - 144k
under 
Adult and Older People
– 145k under 
New funding allocated for
increased cleaning was less
than estimated due to
changes in specification. 
132

Page 133

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (cont.)  Other Property Costs - 96k under Children and Families –
51k under
This underspend is for
planned property
maintenance that will not take
place until the new financial
year. 
Supplies and Services 120k under Supplies for Clients – 108k under  Children and Families –
69k under 
The underspend is due to the
phased implementation of the
new family hubs.  All four
hubs are now fully
operational. 
Transport and Plant (332k) over Pool Car Charges – Rental – (50k)
over
Children and Families –
(68k) over
This is due to an increase in
pool car usage. 
Other Transport Costs – (248k) over  Children and Families –
(99k) over 
This reflects the
commitments in respect of
transporting children to and
from school or respite. 
Adult and Older People
– (151k) over 
This overspend is a result of
the increased cost of taxi
provision for services.  
Fleet Service Charges – Vehicle
Maintenance – (126k) over 
Adult and Older People
– (105k) over 
This overspend relates to
leasing charges for vehicles
within Home Care required to
deliver the service. 
133

Page 134

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and Plant
(cont.) 
Fleet Service Charges – Leasing –
61k under 
Adult and Older People
– 76k under
This underspend reflects the
costs of meeting current
service delivery
requirements. 
Administration 304k under Mobile Phones – 271k under  Adult and Older People
– 247k under 
This underspend is due to a
new contract being
implemented resulting in
lower charges. 
Payments to Other
Bodies
385k under Payments to Voluntary Organisations
– 103k under 
Children and Families –
100k under 
This underspend relates to
Supported Accommodation
which is being used to fund
pressures elsewhere within
the Service. 
Payment to Other Bodies – 501k
under
Children and Families –
302k under 
Adult and Older People
– 164k under 
This is a temporary funding
solution due to service
changes and is required in
full next financial year. 
This is an in year non-
recurring underspend. 
Private Individuals – General – 206k
under 
Children and Families –
209k under 
The underspend relates to
the Supported Carer and
short break service where
recruitment for the service is
ongoing.  
Social Work – Foster Parents – (259k)
over 
Children and Families –
(259k) over 
This overspend is a result of
the continuing requirement
for children’s external foster
placements. 
134

Page 135

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies (cont.) 
Social Work – Adoption Allowances –
(76k) over 
Children and Families –
(76k) over 
This overspend is due to an
increase in the number of
families being supported with
adoption allowances, post
adoption. 
Direct Payments – (75k) over Adult and Older People
– (75k) over
This overspend is due to an
increase in demand for Direct
Payments, under Self
Directed Support legislation.
Payment to
Contractors
(2,571k) over Long Term Care – (1,055k) over  Children and Families -
(1,674k) over 
This overspend is a result of
the continuing requirement
for children’s residential
external school placements. 
Adult and Older People
– 619k under 
This underspend relates to
Care Homes based on
current commitments and if
offset in part by the
overspend in Free Personal
Care. 
CET Allocations – Home Care -
(347k) over 
Adult and Older People
– (376k) over 
This overspend reflects the
current demand for the
external home care service. 
Respite – (188k) over  Children and Families –
(55k) over 
The overspend reflects the
demand for respite services
to support young people and
their families. 
135

Page 136

Subjective Head Variance  Subjective line Service / amount Explanation   
Adult and Older People
– (133k) over 
The overspend reflects the
demand for respite services
to support adult and older
users. 
Day Care – (151k) over  Adult and Older People
– (151k) over 
This overspend reflects the
current demand for the
external day care service. 
Home Support – (209k) over  Adult and Older People
– (209k) over 
This overspend reflects the
current demand for the
external home support
service.   
Free Personal Nursing Care – (228k)
over 
Adult and Older People
– (228k) over 
The overspend is a result of
an Increase in the number of
service users who are Free
Personal Nursing Care only. 
This overspend is offset with
underspend in long term
care. 
Respite awaiting long term care –
(342k) over 
Adult and Older People
– (342k) over 
The overspend reflects the
demand for respite services
to support adult and older
users who require long term
care. 
Payments to
Contractors (cont.) 
Payment to Contractor – Misc. – (50k)
over
Adult and Older People
– (65k) over 
This overspend reflects the
current demand for the
external home care service. 
136

Page 137

Subjective Head Variance  Subjective line Service / amount Explanation
Transfer Payments (255k) over Direct Assistance – (241k) over Children and Families –
(221k) over
This overspend relates to the
payment of kinship care
allowances where demand is
increasing.
Income  388k over
recovered 
Contributions from Other Bodies –
241k over recovered 
Fees and Charges - General – 137k
over recovered 
Children and Families –
290k over recovered 
Justice – (64k) under
recovered 
Adult and Older People
– 137k over recovered 
This is due to funding
received being greater than
budgeted in respect of
Unaccompanied Asylum-
Seeking Children and Care
Payments to Contractors. 
This under recovery is offset
by an underspend in
employee costs (as
mentioned above). 
This over recovery relates to
non-recurring income
received in respect of
recovery of prior year care
costs from service users. 
* The underlined variances represent new variances since the last report.
137

Page 138

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS OVERTIME 0 1 (1) over
ADMIN & CLERICAL STAFF - APT&C BASIC 5,668 4,952 716 under
ADMIN & CLERICAL STAFF - APT&C OVERTIME 0 202 (202) over
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 992 938 54 under
ADMIN & CLERICAL STAFF - APT&C NIC 409 431 (22) over
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 24,246 24,620 (374) over
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 119 810 (691) over
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 4,518 4,590 (72) over
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 2,563 2,722 (159) over
BASIC GRADE SOCIAL WORKERS BASIC 12,031 10,558 1,473 under
BASIC GRADE SOCIAL WORKERS OVERTIME 44 92 (48) over
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 2,254 2,070 184 under
BASIC GRADE SOCIAL WORKERS NIC 1,324 1,179 145 under
HOSPITAL SOCIAL WORKERS BASIC 448 571 (123) over
HOSPITAL SOCIAL WORKERS OVERTIME 0 18 (18) over
HOSPITAL SOCIAL WORKERS SUPERANNUATION 86 98 (12) over
HOSPITAL SOCIAL WORKERS NIC 46 62 (16) over
INSTRUCTORS BASIC 1,434 1,298 136 under
INSTRUCTORS SUPERANNUATION 243 239 4 under
INSTRUCTORS NIC 129 116 13 under
CARE STAFF - APT&C BASIC 18,757 18,197 560 under
CARE STAFF - APT&C OVERTIME 815 1,241 (426) over
CARE STAFF - APT&C SUPERANNUATION 3,275 3,320 (45) over
CARE STAFF - APT&C NIC 1,854 1,817 37 under
HOME CARERS BASIC 27,809 27,457 352 under
HOME CARERS OVERTIME 1,977 2,004 (27) over
HOME CARERS SUPERANNUATION 5,038 4,777 261 under
HOME CARERS NIC 2,840 2,811 29 under
TRAVEL AND SUBSISTENCE 394 333 61 under
OTHER EMPLOYEE COSTS 1,240 1,174 66 under
PENSION INCREASES 328 309 19 under
ADDITIONAL PENSION COSTS 0 88 (88) over
EMPLOYEE COSTS 120,881 119,095 1,786 under
138

Page 139

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
PROPERTY COSTS
RATES 385 381 4 under
SCOTTISH WATER - UNMETERED CHARGES 35 4 31 under
SCOTTISH WATER - METERED CHARGES 178 211 (33) over
RENT 523 553 (30) over
BED AND BREAKFAST 0 1 (1) over
PROPERTY INSURANCE 292 297 (5) over
SECURITY COSTS 3 4 (1) over
GROUND MAINTENANCE 3 0 3 under
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 5 (5) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 0 118 (118) over
LIFE CYCLE MAINTENANCE 0 2 (2) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 63 69 (6) over
GAS HEATING LEASE COSTS 0 1 (1) over
ELECTRICITY  - CONTRACT 926 879 47 under
GAS 1,056 901 155 under
FIXTURE & FITTINGS 0 1 (1) over
CLEANING CONTRACT 386 390 (4) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 328 184 144 under
HEALTH & HYGIENE MATERIALS 91 135 (44) over
WINDOW CLEANING 12 10 2 under
PEST CONTROL 1 0 1 under
REFUSE UPLIFT 47 44 3 under
REMOVAL & STORAGE COSTS 5 4 1 under
OTHER PROPERTY COSTS 204 108 96 under
PROPERTY COSTS 4,538 4,302 236 under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 557 560 (3) over
COMPUTER EQUIPMENT MAINTENANCE 41 10 31 under
I.T. EQUIPMENT MAINT-CONTRACT 205 174 31 under
I.T. ELECTRONIC MESSAGING 102 150 (48) over
EQUIPMENT, APPARATUS AND TOOLS 131 88 43 under
SMALL TOOLS 4 4 0
AIDS & ADAPTIONS 2,201 2,221 (20) over
SUPPLIES FOR CLIENTS 371 263 108 under
FURNITURE - OFFICE 24 41 (17) over
FURNITURE - GENERAL 15 32 (17) over
FURNISHINGS (INCL. CROCKERY & LINEN) 18 18 0
MATERIALS 11 17 (6) over
WILDLIFE AND FLORA 0 0 0
MATERIALS, APPARATUS AND EQUIPMENT 0 23 (23) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC 0 3 (3) over
TV LICENCES - EDUCATION 0 1 (1) over
FOODSTUFFS - GENERAL 0 2 (2) over
PROVISIONS - GENERAL 206 268 (62) over
FOOD PURCHASES WITHIN CONTRACT SERVICE 535 511 24 under
BEVERAGES 63 47 16 under
SCHOOL MILK 38 37 1 under
PROTECTIVE CLOTHING & UNIFORMS 701 702 (1) over
LAUNDRY COSTS 6 6 0
OTHER SUPPLIES AND SERVICES 51 64 (13) over
CATERING - CONTRACT 413 365 48 under
CATERING - OUTWITH CONTRACT 64 30 34 under
OUTSOURCED MAIL 0 1 (1) over
DELIVERY CHARGE 0 1 (1) over
BULK BUYING DISCOUNT 0 (2) 2 under
SUPPLIES AND SERVICES 5,757 5,637 120 under
139

Page 140

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 2 (2) over
POOL CAR CHARGES-RENTAL 128 178 (50) over
POOL CAR CHARGES-FUEL 42 8 34 under
POOL CAR CHARGES-ADDITIONAL COSTS 7 2 5 under
OTHER TRANSPORT COSTS 792 1,040 (248) over
INSURANCE 24 21 3 under
LICENCES 0 1 (1) over
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 73 199 (126) over
FLEET SERVICE CHARGES - ASSET MODIFICATIONS 0 2 (2) over
FLEET SERVICE CHARGES - LEASING 530 469 61 under
FLEET SERVICE CHARGES - HIRED VEHICLES 24 7 17 under
FLEET SERVICE CHARGES - CONTRACT HIRE 4 25 (21) over
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 29 58 (29) over
FLEET SERVICE CHARGES - FUEL 357 378 (21) over
FLEET SERVICE CHARGES - DRIVERS 2,665 2,620 45 under
HIRE OF EXTERNAL VEHICLES 7 0 7 under
HIRE OF SKIPS 0 1 (1) over
PUPIL TRANSPORT - OTHER 10 13 (3) over
TRANSPORT AND PLANT 4,692 5,024 (332) over
ADMINISTRATION
PRINTING AND STATIONERY 102 104 (2) over
TELEPHONES 210 200 10 under
MOBILE PHONES 393 122 271 under
ADVERTISING - RECRUITMENT 4 4 0
ADVERTISING - OTHER 12 6 6 under
POSTAGES/COURIERS 55 50 5 under
MEMBERSHIP FEES/SUBSCRIPTIONS 53 39 14 under
INSURANCE 27 27 0
MEDICAL COSTS 26 63 (37) over
LEGAL EXPENSES 297 314 (17) over
HOSPITALITY / CIVIC RECOGNITION 7 9 (2) over
OTHER ADMIN COSTS 87 35 52 under
CONFERENCES - OFFICIALS (incl associated costs) 4 1 3 under
TRAINING 40 34 6 under
INTERNAL SUPPORT SERVICES ALLOCATION 410 415 (5) over
ADMINISTRATION 1,727 1,423 304 under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 15 38 (23) over
OTHER LOCAL AUTHORITIES 25 46 (21) over
GRANTS TO VOLUNTARY ORGANISATIONS 23 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 2,860 2,757 103 under
PAYMENTS TO OTHER BODIES 2,703 2,202 501 under
PAYMENTS TO HEALTH BOARD 1,458 1,433 25 under
PRIVATE INDIVIDUALS - GENERAL 1,144 938 206 under
SOCIAL WORK - FOSTER PARENTS 6,782 7,041 (259) over
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 90 4 under
SOCIAL WORK - ADOPTION ALLOWANCES 775 851 (76) over
DIRECT PAYMENTS 10,048 10,123 (75) over
PAYMENT TO OTHER BODIES 25,927 25,542 385 under
140

Page 141

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR - DEFAULT 1,510 1,510 0
PAYMENT TO PRIVATE CONTRACTOR - LONG TERM CARE 65,572 66,627 (1,055) over
PAYMENT TO PRIVATE CONTRACTOR - CET ALLOCATION - HOME CARE 31,779 32,126 (347) over
PAYMENT TO PRIVATE CONTRACTOR - RESPITE 2,660 2,848 (188) over
PAYMENT TO PRIVATE CONTRACTOR - DAY CARE 1,082 1,233 (151) over
PAYMENT TO PRIVATE CONTRACTOR - HOME SUPPORT 22,229 22,438 (209) over
PAYMENT TO PRIVATE CONTRACTOR - FREE PERSONAL NURSING CARE 8,577 8,805 (228) over
PAYMENT TO PRIVATE CONTRACTOR - RESPITE AWAIT' LONG TERM CARE 0 342 (342) over
PAYMENT TO PRIVATE CONTRACTOR - DAY RELATED ACTIVITIES INCL RESIDENTIAL PLACEMENTS3,775 3,825 (50) over
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 115 112 3 under
SLC MANAGED 0 4 (4) over
PAYMENT TO CONTRACTORS 137,299 139,870 (2,571) over
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 4,493 4,734 (241) over
SECTION PAYMENTS 83 97 (14) over
TRANSFER PAYMENTS 4,576 4,831 (255) over
FINANCING CHARGES
LEASING CHARGES - FINANCE 1 0 1 under
LEASING CHARGES - OPERATIONAL 0 1 (1) over
I.T. EQUIPMENT LEASING-CONTRACT 400 461 (61) over
FINANCING CHARGES 401 462 (61) over
TOTAL EXPENDITURE 305,798 306,186 (388) over
INCOME
NON RELEVANT GOVERNMENT GRANT (7,744) (7,777) 33 over rec
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (25,085) (25,080) (5) under rec
CONTRIBUTIONS FROM OTHER BODIES (699) (940) 241 over rec
SALES - SALE OF MEALS (14) (20) 6 over rec
FEES AND CHARGES - GENERAL (5,920) (6,057) 137 over rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (656) (679) 23 over rec
CHARGES TO HEALTH BOARDS (27,571) (27,610) 39 over rec
FEES AND CHARGES - OTHER BODIES (19) (18) (1) under rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (218) (182) (36) under rec
RENTAL INCOME (27) (22) (5) under rec
OTHER INCOME (235) (176) (59) under rec
REALLOCATION OF SUPPORT COSTS (400) (415) 15 over rec
INCOME (68,588) (68,976) 388 over rec
NET EXPENDITURE 237,210 237,210 0
141

Page 142

142

Page 143

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Forum of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2024 to 14 June 2024
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2024/2025, and the actual spend as at 14 June 2024 (section 4 and
Appendix 1), be noted; 
(2) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 14 June 2024 (section 5 and Appendix
2 of the report), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2024/2025 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section 5). 
It will also provide the actual spend as at 14 June 2024. 
3.2. The Council has adopted a new Financial Management System, Oracle Fusion, which
integrates a number of business processes, including HR and Procurement/Payables
data. In a financial management context, this will allow us to forecast budget
information, and therefore means a change in format in relation to the reports provided
to the Forum. This is reflected in the monitoring statements in appendices 1 and 2. 
4. General Services 2024/2025 Projected Outturn as at 14 June 2024
4.1. As at 14 June 2024, the projected outturn position for 2024/2025 on the General
Services budget is break-even (Appendix 1).   
4.2. Section 4.3 onwards provides detail on a number of key budget areas.   
4.3. Teacher Numbers:  As previously reported, in relation to 2024/2025, the Council has
now received notification that the allocation of funding for teacher numbers of £145.5
million for 2024/2025 will be distributed via Specific Resource Grants, and those grants
will be conditional on councils agreeing at the outset to maintain teacher numbers. 
Our share of the £145.5 million funding is £9.379 million. Scottish Government have
indicated that they will consider mitigations presented by councils for reducing
9
143

Page 144

teachers but that we will not know if mitigations will be acceptable until much later in
the year.   
4.4. Scottish Government have also indicated that any reduction in funding will be
proportionate for the actual number of teachers reduced against the baseline, rather
than losing the full amount. 
4.5. A further letter is being sent to the Scottish Government in relation to SLC position, as
we do expect our teacher numbers to reduce this year.  This is due to 2 main areas.
The first is a reduction in teacher numbers due to the end of the Council investment in
Early Level Teachers, around 46 FTE, which were recruited for a 2-year fixed term
period from August 2022. These temporary arrangements have now ended as the
temporary funding has been used and therefore our teacher numbers will reduce.
Secondly, there is a national reduction in Newly Qualified Teachers (NQTs) compared
to last year which has a current impact of 28 FTE fewer NQTs available for the Council.   
4.6. COSLA Leaders’ discussions have concluded at this stage that councils cannot sign
a grant offer letter that restricts the use of funding in this way.  Further engagement
with the Scottish Government is being pursued. 
4.7. Employers Pension Contribution Increase (Teachers):  As of 1 April 2024, the
Council’s pension contribution for Teachers’ Pensions was increased from 23% to
26% of basic pay.  The cost to the Council is an estimated £5.5 million however, the
Council has not yet been notified of funding to support this increase.  That said, the
Scottish Government expect to receive funding for this from the UK Government and
have committed to passing this on to councils.   
4.8. School Meal Debt:  As advised previously, national School Meal debt fund of £1.500
million was announced by the First Minister in May 2024 to support Local Authorities
to cancel School Meal debt. Local Authorities will have the opportunity to bid for one-
off funding based on their decision to write off debt at a local level. Funding is available
to support retrospective debt prior to April 2024 and applications are to be submitted
by 1 August 2024.  Officers are considering a bid submission.  Information on the bid
and its outcome will be provided when known.   
5. Housing Revenue Account Position
5.1. As at 14 June 2024, Appendix 2 of the report shows a break-even position on the
Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget management
applied across the Resources. The risk is managed through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the probable
144

Page 145

outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in this
report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
25 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 14 June 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
145

Page 146

Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 124.842 124.842 0.000 0.00% 22.304
Facilities Waste and Grounds 76.062 75.867 0.195 0.26% 13.212
Leisure and Culture 21.738 21.738 0.000 0.00% 4.306
Planning and Regulatory Services 4.678 4.634 0.044 0.94% 0.720
Enterprise and Sustainable Development 5.729 5.719 0.010 0.17% 0.905
Roads, Transportation and Fleet 16.635 16.884 (0.249) (1.50%) 3.161
Education Resources 455.161 455.161 0.000 0.00% 81.810
Education 455.161 455.161 0.000 0.00% 81.810
Finance and Corporate Resources 37.822 37.822 0.000 0.00% 17.203
Finance Services - Strategy 1.858 1.858 0.000 0.00% 0.681
Finance Services - Transactions 16.922 16.922 0.000 0.00% 10.525
Audit and Compliance Services 0.320 0.320 0.000 0.00% 0.100
Information Technology Services 5.904 5.904 0.000 0.00% 3.157
Communications and Strategy Services 2.387 2.387 0.000 0.00% 0.452
Administration and Licensing Services 4.075 4.075 0.000 0.00% 0.955
Personnel Services 6.356 6.356 0.000 0.00% 1.333
Housing & Technical Resources 13.584 13.584 0.000 0.00% 10.716
Housing Services 8.768 8.719 0.049 0.56% 0.433
Property Services 4.816 4.865 (0.049) (1.02%) 10.283
Social Work Resources 233.959 233.959 0.000 0.00% 46.464
Performance and Support Services 6.046 6.046 0.000 0.00% 0.930
Children and Families 46.663 46.663 0.000 0.00% 8.489
Adults and Older People 180.513 180.513 0.000 0.00% 37.010
Justice and Substance Misuse 0.737 0.737 0.000 0.00% 0.035
Joint Boards 1.902 1.902 0.000 0.00% 0.439
867.270 867.270 0.000 0.00% 178.936
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 867.270 867.270 0.000 0.00% 178.936
CFCR 0.000 0.000 0.000 0.00% 0.000
Loan Charges 39.589 39.589 0.000 0.00% 0.000
Corporate Items 16.045 16.045 0.000 0.00% 0.585
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Total Expenditure 946.194 946.194 0.000 0.00% 179.521
Council Tax 181.587 181.587 0.000 0.00% 41.905
Less: Council Tax Reduction Scheme (23.544) (23.544) 0.000 0.00% (5.433)
158.043 158.043 0.000 0.00% 36.472
General Revenue Grant 385.417 385.417 0.000 0.00% 88.942
Non Domestic Rates 364.911 364.911 0.000 0.00% 84.210
Transfer from Reserves 37.823 37.823 0.000 0.00% 0.000
Total Income 946.194 946.194 0.000 0.00% 209.624
Net Expenditure 0.000 0.000 0.000 0.00% (30.103)
Period Ended 14 June 2024 (No.3)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
146

Page 147

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 13.782 13.782 0.000 0.00% 2.607
Property Costs 59.203 59.203 0.000 0.00% 5.407
Supplies and Services 1.543 1.543 0.000 0.00% 0.062
Transport and Plant 0.195 0.195 0.000 0.00% 0.016
Administration 5.594 5.594 0.000 0.00% 0.091
Payment to Other Bodies 2.975 2.975 0.000 0.00% 0.552
Payment to Contractors 0.100 0.100 0.000 0.00% 0.171
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 33.573 33.573 0.000 0.00% 7.734
Total Controllable Exp. 116.965 116.965 0.000 0.00% 16.640
Total Controllable Inc. (123.398) (123.398) 0.000 0.00% (21.158)
Transfer to/(from) Balance Sheet (4.229) (4.229) 0.000 0.00% 0.000
Net Controllable Exp. (10.662) (10.662) 0.000 0.00% (4.518)
Loan Charges 10.662 10.662 0.000 0.00% 4.518
Net Controllable Exp. 0.000 0.000 0.000 0.00% 0.000
Variance Explanations
No variances to note.
Virements
None.
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 14 June 2024 (No.3)
Housing Revenue Account
147

Page 148

148

Page 149

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 15 August 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget 2024/2025 - Detailed Resource
Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2024/2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the 2024/2025 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted. 
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 14 June 2024. The detailed papers cover the
General Services and also the Housing Revenue Account. 
3.2. The following information is provided for each Resource and the Housing Revenue
Account:- 
 an Executive Summary showing the top-level position
 details of the most significant variances across Subjective headings and across
Services
 a line-by-line trend analysis of the total Resource expenditure and income
across Subjective headings 
3.3. These are shown in appendices A to F attached. 
3.4. The Council has adopted a new Financial Management System, Oracle Fusion,
which integrates a number of business processes, including HR and
Procurement/Payables data. In a financial management context, this will allow us to
forecast budget information, and therefore means a change in format in relation to
the reports provided to the Financial Resources Scrutiny Forum. This is reflected in
appendices A to F. 
4. Employee Implications
4.1. None 
10
149

Page 150

5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.   
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources. The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
25 July 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Revenue Ledger prints to 14 June 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk 
150

Page 151

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 14 June 2024 (No 3)
Community and Enterprise Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Facilities, Waste and Grounds 76.062 75.867 0.195 0.26% 13.212
Leisure and Culture 21.738 21.738 0.000 0.00% 4.306
Planning and Regulatory Services 4.678 4.634 0.044 0.94% 0.720
Environmental and Sustainable Devlopment 5.729 5.719 0.010 0.17% 0.905
Roads, Transportation and Fleet 16.635 16.884 (0.249) -1.50% 3.161
Total Community and Enterprise Resources 124.842 124.842 (0.000) 0.00% 22.304
10
151

Page 152

Community and Enterprise Resources Variance Analysis 2024/25 (Period 3) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,189k
under
APT&C Basic/ Overtime/
Superannuation/ National Insurance –
1,189k under 
Facilities, Waste and
Grounds Services -
243k under
The variances are mainly due to
vacant posts, with recruitment
currently being progressed.   
Planning and
Regulatory Services -
70k under 
Enterprise and
Sustainable
Development - 22k
under 
Roads, Transportation
and Fleet Services -
854k under 
The variances are mainly due to
vacant posts, with recruitment
currently being progressed. The
underspend could result in
reduced recharges to the
Roads Client Account and a
possible increase in costs on
sub-contractors. 
152

Page 153

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (79k) over Water Metered Charges - (11k) over Roads, Transportation
and Fleet Services -
(11k) over 
The level of water charges to
supply the depots within Roads
Contracting is higher than
budget. 
Electricity Contract - (15k) over Roads, Transportation
and Fleet Services -
(15k) over 
This projected overspend
mainly relates to higher than
budgeted electricity expenditure
on the charging of electrical
vehicles. 
Cleaning & Janitorial Supplies and
Equipment - (46k) over
Facilities, Waste and
Grounds Services -
(40k) over
This projected overspend
relates to an increase in costs
for cleaning materials.
Supplies and
Services
(225k) over Computer Equipment Purchase -
(133k) over
Planning and
Regulatory Services -
(30k) over 
This projected overspend
mainly relates to the greater
than budgeted costs on the IT
system upgrade for IDOX within
Planning & Building Standards. 
Roads, Transportation
and Fleet Services -
(88k) over
This projected overspend
mainly relates to increased
costs for annual subscriptions
for Computer Licenses within
Roads.     
IT Equipment Maintenance - (16k)
over 
Enterprise and
Sustainable
Development - (16k)
over 
This projected overspend is
within Support and relates to IT
Leasing costs, being greater
than budget.
153

Page 154

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
Materials - (68k) over  Facilities, Waste and
Grounds Services -
(72k) over 
This projected overspend
mainly relates to an increased
level of spend on replacement
domestic waste bins within
Grounds and Streets. 
Transport and
Plant
(801k) over Fleet Services - Vehicle Hires - (500k)
over 
Roads, Transportation
and Fleet - (500k) over 
This projected overspend
reflects the demand for vehicle
hire and is offset by a
corresponding over recovery of
income. 
Fleet Service Charges - Vehicle
Maintenance - (156k) over
Facilities, Waste and
Grounds Services -
(109k) over 
Roads, Transportation
and Fleet - (44k) over 
This projected overspend is due
to higher than anticipated
charges for routine
maintenance within Waste,
Streets and Grounds. 
The overspend is due to higher
than anticipated charges for
routine maintenance. 
Fleet Service Charges - Plant
Maintenance - 34k under
Roads, Transportation
and Fleet - 34k under 
This projected underspend is
mainly due to lower than
anticipated upkeep of winter
plant within Roads General. 
Fleet Service Charges - Leasing -
(128k) over
Roads, Transportation
and Fleet - (141k) over 
This projected overspend
mainly relates to increased
annual charges as a result of
the purchase price of new
vehicles.   
154

Page 155

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.)  
Facilities, Waste and
Grounds Services - 20k
under 
This projected underspend is
due to a reduction in the
number of leased vehicles
required within the Streets
service. 
Fleet Service Charges – Hired
Vehicles - (108k) over
Facilities, Waste and
Grounds Services - 17k
under 
Roads, Transportation
and Fleet - (125k) over
This projected underspend is
within Grounds and reflects a
reduction in the use of hired
vehicles. 
This projected overspend
mainly relates to the higher than
budgeted costs for winter plant
hire. 
Income 42k under
recovered
Fees and Charges - General - (515k)
under recovered
Facilities, Waste and
Grounds Services –
(18k) under recovered 
The projected under recovery is
mainly due to lower than
budgeted income from care of
gardens within grounds
services. 
Roads, Transportation
and Fleet - (497k)
under recovered
The projected under recovery is
within parking where the
demand is less than
anticipated.     
Fees and Charges - Department of
the Authority - 136k over recovered 
Facilities, Waste and
Grounds Services -
136k over recovered 
This projected over recovery is
mainly due to an increase in
additional service requests to
Waste Services from Housing
and Technical Resources for
additional bin uplifts. 
155

Page 156

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fleet Services - 500k over recovered Roads, Transportation
and Fleet - 500k over
recovered 
The over recovery reflects the
demand for vehicle hire and is
offset by a corresponding
overspend (as mentioned
above). 
Trading Services Recharges - (175k)
under recovered 
Roads, Transportation
and Fleet - (175k)
under recovered
The current level of income
from maintenance works is
lower than anticipated within
Roads Construction. 
156

Page 157

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Community & Enterprise Resources Summary Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 78,786 14,316 78,154 632
APT & C OVERTIME 1,630 331 1,631 (1)
APT & C SUPERANNUATION 5,279 704 4,422 857
APT & C NIC 6,346 801 6,645 (299)
TRAVEL AND SUBSISTENCE 23 1 23 0
OTHER EMPLOYEE COSTS 229 0 229 0
PENSION INCREASES 772 121 772 0
ADDITIONAL PENSION COSTS
EMPLOYEE COSTS 93,065 16,274 91,876 1,189
PROPERTY COSTS
RATES 1,005 0 1,005 0
SCOTTISH WATER - UNMETERED CHARGES 325 2 325 0
SCOTTISH WATER - METERED CHARGES 155 28 166 (11)
RENT 197 4 196 1
SERVICE CHARGE 42 1 42 0
FACTORING CHARGES 16 14 16 0
PROPERTY INSURANCE 288 0 288 0
SECURITY COSTS 44 9 39 5
GROUND MAINTENANCE 8 0 8 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 10 1 20 (10)
LIFE CYCLE MAINTENANCE 0 2 10 (10)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 31 15 24 7
SOLID FUEL HEATING MAINTENANCE 0 2 0 0
ASBESTOS 0 1 0 0
FIXED ELECTRICAL 0 5 0 0
ELECTRICITY - CONTRACT 5,789 444 5,804 (15)
GAS 865 197 865 0
SOLID FUEL 14 0 14 0
JANITORIAL SUPPLIES 1 0 1 0
CLEANING CONTRACT 20 15 20 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 428 77 474 (46)
HEALTH & HYGIENE MATERIALS 25 (20) 25 0
PEST CONTROL 0 26 0 0
REFUSE UPLIFT 404 4 404 0
OTHER PROPERTY COSTS 27 2 27 0
PROPERTY COSTS 9,694 829 9,773 (79)
157

Page 158

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Community & Enterprise Resources Summary Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 588 316 721 (133)
COMPUTER EQUIPMENT MAINTENANCE 79 0 79 0
I.T. EQUIPMENT MAINT-CONTRACT 306 64 322 (16)
I.T. ELECTRONIC MESSAGING 74 0 74 0
EQUIPMENT, APPARATUS AND TOOLS 878 94 878 0
SMALL TOOLS 107 0 107 0
FURNITURE - GENERAL 3 0 3 0
FURNISHINGS (INCL. CROCKERY & LINEN) 110 2 110 0
MATERIALS 7,242 632 7,310 (68)
STOCK/STORE ISSUES 0 215 0 0
MATERIALS, APPARATUS AND EQUIPMENT 9 2 9 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 1 2 0
FOODSTUFFS - GENERAL 5,001 957 5,001 0
PROTECTIVE CLOTHING & UNIFORMS 208 60 213 (5)
LAUNDRY COSTS 10 2 10 0
OTHER SUPPLIES AND SERVICES 1,450 36 1,453 (3)
CATERING - EXTERNAL 0 2 0 0
MAJOR SUPPLY OF ELECTRICAL POWER 2,498 0 2,498 0
OUTSOURCED MAIL 0 1 0 0
DELIVERY CHARGE 1 0 1 0
SUPPLIES AND SERVICES 18,566 2,384 18,791 (225)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 3 0 0
PURCHASE OF PLANT 63 3 41 22
FLEET SERVICES - DRIVERS 61 0 68 (7)
FLEET SERVICES - FUEL 2,998 345 2,998 0
FLEET SERVICES - VEHICLE HIRE 1,229 161 1,729 (500)
POOL CAR CHARGES - RENTAL 64 16 75 (11)
POOL CAR CHARGES - FUEL 22 0 18 4
POOL CAR CHARGES - ADDITIONAL COSTS 7 0 5 2
TYRES 0 1 0 0
OTHER TRANSPORT COSTS 78 30 71 7
TRANSPORT INSURANCE 93 0 93 0
LICENCES 491 82 491 0
FLEET SERVICES - REPAIRS 1,917 589 1,917 0
PLANT SERVICES 19 1 19 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,297 957 4,453 (156)
FLEET SERVICE CHARGES - PLANT MAINTENANCE 269 48 235 34
FLEET SERVICE CHARGES - ASSET MODIFICATION 71 2 61 10
FLEET SERVICE CHARGES - LEASING 5,064 2,276 5,192 (128)
FLEET SERVICE CHARGES - HIRED VEHICLES 1,097 150 1,205 (108)
FLEET SERVICE CHARGES - CONTRACT HIRE 12 0 12 0
FLEET SERVICE CHARGES - ROAD FUND LICENCE 218 41 210 8
FLEET SERVICE CHARGES - FUEL 3,163 543 3,137 26
FLEET SERVICE CHARGES - DRIVERS 52 0 52 0
HIRE OF EXTERNAL VEHICLES 68 0 60 8
HIRE OF EXTERNAL PLANT 328 69 337 (9)
HIRE OF SKIPS 17 5 20 (3)
EXTERNAL TRANSPORT CONTRACT 0 18 0 0
PUPIL TRANSPORT - OTHER 126 (10) 126 0
TRANSPORT AND PLANT 21,824 5,330 22,625 (801)
158

Page 159

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Community & Enterprise Resources Summary Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 127 18 119 8
TELEPHONES 109 0 94 15
MOBILE PHONES 70 0 70 0
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 8 0
ADVERTISING - OTHER 75 16 75 0
POSTAGES/COURIERS 33 5 38 (5)
MEMBERSHIP FEES/SUBSCRIPTIONS 55 70 32 23
INSURANCE 260 0 261 (1)
MEDICAL COSTS 5 3 20 (15)
LEGAL EXPENSES 2 17 37 (35)
HOSPITALITY / CIVIC RECOGNITION 3 2 3 0
INTERNET AGENCY FEES 23 6 23 0
SECURITY UPLIFT FEES 26 3 26 0
OTHER ADMIN COSTS 4 0 4 0
TRAINING 3 5 3 0
ADMINISTRATION 803 145 813 (10)
PAYMENT TO OTHER BODIES
SPTE: ANNUAL BUS SUBSIDY 1,891 448 1,891 0
SPTE: BUS OTHER 258 65 258 0
SPTE: FERRIES 29 7 29 0
SPTE: UNDERGROUND 1,318 330 1,318 0
SPTE: OTHER 1,727 432 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 65 131 0
OTHER LOCAL AUTHORITIES 75 19 55 20
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 22 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 39 0
PAYMENTS TO OTHER BODIES 634 3 634 0
EXTERNAL AUDIT FEES 3 2 3 0
ACTIVITIES PROGRAMME 70 7 70 0
COUNSELLING 5 0 5 0
PAYMENT TO OTHER BODIES 6,202 1,378 6,182 20
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 13,417 1,764 13,417 0
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 14 302 0
PAYMENT TO PRIVATE CONTRACTOR 37,665 6,837 37,700 (35)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 2 0 0
PAYMENT TO CONTRACTORS 51,384 8,617 51,419 (35)
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 153 617 0
TRANSFER PAYMENTS 617 153 617 0
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 207 6 224 (17)
FINANCING CHARGES 207 6 224 (17)
TOTAL EXPENDITURE 202,362 35,116 202,320 42
159

Page 160

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Community & Enterprise Resources Summary Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 22 (37) 0
CONTRIBUTIONS FROM OTHER BODIES (354) 0 (354) 0
SALES - GENERAL (4,247) (1,064) (4,247) 0
SALES - DEPARTMENTS OF THE AUTHORITY (126) (57) (126) 0
FEES AND CHARGES - GENERAL (9,744) (2,004) (9,229) (515)
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,242) (1,598) (7,378) 136
RENTAL INCOME (18) 0 (18) 0
FLEET SERVICES (12,053) (2,409) (12,553) 500
OTHER INCOME (1,507) (103) (1,519) 12
RECOVERY FROM CAPITAL (1,333) 0 (1,333) 0
RECHARGES - DEPARTMENTS OF THE AUTHORITY (40,859) (5,599) (40,684) (175)
TOTAL INCOME (77,520) (12,812) (77,478) (42)
NET EXPENDITURE 124,842 22,304 124,842 0
160

Page 161

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 14 June 2024 (No 3)
Education Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Education 455.161 455.161 0.000 0.00% 81.810
Total Education Resources 455.161 455.161 0.000 0.00% 81.810
10
161

Page 162

Education Resources Variance Analysis 2024/25 (Period 3) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 435k under Teachers Basic - (1,015k) over 
APT&C Basic - 1,450k under
Schools - (1,015k) over 
Early Years - 1,450k
under
The projected overspend
relates to the increased use of
supply teachers for absence
cover. 
The projected underspend
mainly relates to Early Years
posts and is the result of staff
turnover.     
Transport and
Plant
(4,098k) over Pupil Transport - Strathclyde
Passenger Transport - (4,098k) over 
Schools - (4,098k) over  This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs.
Administration
Costs
53k under Conferences - 53k under Schools - 53k under  The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated.     
Payments to Other
Bodies 
1,085k under  Payments to Other Bodies - 1,100k
under 
Early Years - 1,100k
under 
This projected underspend is
due to less than anticipated
core Early Years spend
including cross boundary
charges to other Local
Authorities.
Transfer Payments 250k under Footwear and Clothing Grants - 250k
under 
Schools - 250k under  This projected underspend
reflects lower than anticipated
expenditure on footwear and
clothing grants during the
financial year, reflecting current
demand.
162

Page 163

Subjective Head Variance Subjective Line Service / amount Explanation
Income 2,300k over
recovered
Fees and Charges - Other Local
Authorities - 800k over recovered 
Early Years Fees - 1,500k over
recovered 
Schools - 800k over
recovered 
Early Years - 1,500k
over recovered
This projected over recovery
reflects the increase in income
recovered from other Local
Authorities for children
attending schools in South
Lanarkshire. This income is
used to support the cost of
external placements. 
This projected over recovery in
Early Years’ fees relates to
increased uptake of available
nursery places beyond 1140
hours. 
163

Page 164

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Education Resource - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 179,644 35,345 180,659 (1,015)
TEACHERS SUPERANNUATION 41,344 9,164 41,344 0
TEACHERS NI 18,885 3,915 18,885 0
APT&C BASIC 68,785 12,988 67,335 1,450
APT&C OVERTIME 0 1 0 0
APT&C SUPERANNUATION 4,435 807 4,435 0
APT&C NIC 4,879 1,010 4,879 0
CARE STAFF - APT&C BASIC 0 26 0 0
CARE STAFF - APT&C SUPERANNUATION 0 1 0 0
CARE STAFF - APT&C NIC 0 2 0 0
MANUAL BASIC 0 41 0 0
MANUAL SUPERANNUATION 0 1 0 0
MANUAL NIC 0 2 0 0
SESSIONAL WORK 0 2 0 0
TRAVEL AND SUBSISTANCE 0 2 0 0
PENSION INCREASES 434 45 434 0
PREMATURE RETIRALS 5,041 306 5,041 0
EMPLOYEE COSTS 323,447 63,658 323,012 435
PROPERTY COSTS
RATES 17,898 0 17,898 0
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,385 0 1,385 0
SCOTTISH WATER - METERED CHARGES 782 216 782 0
RENT 266 38 266 0
SERVICE CHARGE 40 20 40 0
PROPERTY INSURANCE 480 0 480 0
SECURITY COSTS 68 8 68 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 62 2 62 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 0 6 0 0
ADAPTIONS - INTERNAL CONTRACTORS 50 34 50 0
ELECTRICITY  - CONTRACT 8,691 616 8,691 0
GAS 4,073 343 4,073 0
HEATING OIL 164 4 164 0
SOLID FUEL 171 78 171 0
JANITOR SERVICE 65 14 65 0
CLEANING CONTRACT 885 117 885 0
CLEANING OUTWITH CONTRACT 8 0 8 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 309 110 309 0
HEALTH & HYGIENE MATERIALS 45 0 45 0
WINDOW CLEANING 7 0 7 0
REFUSE UPLIFT 16 2 16 0
OTHER PROPERTY COSTS 161 0 161 0
OFFICE ACCOM-FACILITIES MANAGEMENT 0 4 0 0
ACCOMMODATION RECHARGE TO USERS 882 0 882 0
PROPERTY COSTS 36,508 1,612 36,508 0
164

Page 165

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Education Resource - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 87 24 87 0
COMPUTER EQUIPMENT RENTAL 1 0 1 0
I.T. EQUIPMENT MAINT-CONTRACT 2,713 379 2,713 0
I.T. ELECTRONIC MESSAGING 22 0 22 0
EQUIPMENT, APPARATUS AND TOOLS 58 5 58 0
SMALL TOOLS 0 0 0 0
AIDS FOR CLIENTS 117 30 117 0
ADAPTATIONS FOR CLIENTS 0 1 0 0
SUPPLIES FOR CLIENTS 0 1 0 0
FURNITURE - OFFICE 1 0 1 0
FURNITURE - GENERAL 114 1 114 0
FURNISHINGS (INCL. CROCKERY & LINEN) 0 4 0 0
MATERIALS 0 2 0 0
MATERIALS, APPARATUS AND EQUIPMENT 1,889 287 1,914 (25)
PUPIL EQUITY FUNDING 7,673 2 7,673 0
LIBRARY/RESOURCE CENTREMATERIALS 81 10 81 0
AUDIO VISUAL 4 0 4 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 4 9 4 0
TV LICENCES - EDUCATION 24 1 24 0
FOODSTUFFS - GENERAL 77 43 77 0
PROTECTIVE CLOTHING & UNIFORMS 11 5 11 0
LAUNDRY COSTS 2 0 2 0
OTHER SUPPLIES AND SERVICES 23 0 23 0
HEALTH AND SAFETY 134 74 134 0
CATERING - CONTRACT 2,749 27 2,749 0
CATERING - OUTWITH CONTRACT 8 1 8 0
CATERING - EXTERNAL 2 3 2 0
DELIVERY CHARGE 1 1 1 0
SUPPLIES AND SERVICES 15,795 910 15,820 (25)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 18 0 0
POOL CAR CHARGES-RENTAL 0 3 0 0
OTHER TRANSPORT COSTS 2 0 2 0
INSURANCE 3 0 3 0
FLEET SERVICES - REPAIRS 0 1 0 0
FLEET SERVICE CHARGES - SCHEDULED MAINTENANCE 1,587 48 1,587 0
HIRE OF EXTERNAL VEHICLES 10 70 10 0
HIRE OF SKIPS 0 2 0 0
EXTERNAL TRANSPORT CONTRACT 0 2 0 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 5,675 963 5,675 0
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 6,083 2,783 10,181 (4,098)
PUPIL TRANSPORT - OTHER 132 20 132 0
TRANSPORT AND PLANT 13,492 3,910 17,590 (4,098)
165

Page 166

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Education Resource - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 277 79 277 0
TELEPHONES 229 1 229 0
MOBILE PHONES 7 0 7 0
ADVERTISING - OTHER 11 0 11 0
POSTAGES/COURIERS 72 8 72 0
MEMBERSHIP FEES/SUBSCRIPTIONS 13 48 13 0
INSURANCE 76 0 76 0
MEDICAL COSTS 1 9 1 0
SECURITY UPLIFT FEES 0 1 0 0
OTHER ADMIN COSTS 2 0 2 0
CONFERENCES - OFFICIALS (incl associated costs) 53 0 0 53
TRAINING 89 80 89 0
ADMINISTRATION 830 226 777 53
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 0 2 0 0
OTHER LOCAL AUTHORITIES 1,431 0 1,446 (15)
SCOTTISH QUALIFICATIONS AUTHORITY 1,563 1,558 1,563 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 0 9 0 0
PAYMENTS TO OTHER BODIES 19,682 4,635 18,582 1,100
INDEPENDENT SCHOOL PLACES 3,725 1,039 3,725 0
CONTRACT SPEECH THERAPY 678 0 678 0
SCHOOL ACTIVITIES 104 57 104 0
RESEARCH GRANTS - EDUCATION 13 45 13 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 28 3 28 0
P.E. FACILITIES 123 0 123 0
ACTIVITIES PROGRAMME 1 26 1 0
COUNSELLING 1,228 110 1,228 0
COPYRIGHT AGREEMENT 0 75 0 0
VAT FREE EXCURSIONS - EDUCATION 0 15 0 0
EDUCATION MANAGEMENT SAVINGS 0 0 0 0
PRIVATE INDIVIDUALS - GENERAL 0 6 0 0
PAYMENT TO OTHER BODIES 28,576 7,580 27,491 1,085
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 46,332 3,616 46,332 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 8 0 0
PAYMENT TO CONTRACTORS 46,332 3,624 46,332 0
TRANSFER PAYMENTS
RENT REBATES 0 201 0 0
FOOTWEAR & CLOTHING GRANTS 2,273 1,312 2,023 250
WORK EXPERIENCE 22 0 22 0
TRANSFER PAYMENTS 2,295 1,513 2,045 250
166

Page 167

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Education Resource - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
FINANCING CHARGES
LEASING CHARGES - FINANCE 0 1 0 0
LEASING CHARGES - OPERATIONAL 3 0 3 0
I.T. EQUIPMENT LEASING - CONTRACT 402 68 402 0
FINANCING CHARGES 405 69 405 0
TOTAL EXPENDITURE 467,680 83,102 469,980 (2,300)
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) (43) (170) 0
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (8,988) (15) (8,988) 0
CONTRIBUTIONS FROM OTHER BODIES (1,185) (677) (1,185) 0
FEES AND CHARGES - GENERAL 0 (6) 0 0
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (770) 0 (1,570) 800
PLAYGROUP ACCOMMODATION CHARGE (10) (7) (10) 0
EARLY YEARS FEES (435) (542) (1,935) 1,500
RENTAL INCOME (20) 0 (20) 0
COURSE FEES (35) 0 (35) 0
OTHER INCOME (24) (2) (24) 0
ACCOMMODATION INCOME FROM USERS (882) 0 (882) 0
INCOME (12,519) (1,292) (14,819) 2,300
NET EXPENDITURE 455,161 81,810 455,161 0
167

Page 168

168

Page 169

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 14 June 2024 (No 3)
Finance and Corporate Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Finance Services - Strategy 1.858 1.858 0.000 0.00% 0.681
Finance Services - Transactions 16.922 16.922 0.000 0.00% 10.525
Audit and Compliance Services 0.320 0.320 0.000 0.00% 0.100
Information Technology Services 5.904 5.904 0.000 0.00% 3.157
Communications and Strategy Services 2.387 2.387 0.000 0.00% 0.452
Administration and Licensing Services 4.075 4.075 0.000 0.00% 0.955
Personnel Services 6.356 6.356 0.000 0.00% 1.333
Total Finance and Corporate Resources 37.822 37.822 0.000 0.00% 17.203
10
169

Page 170

Finance and Corporate Resources Variance Analysis 2024/25 (Period 3) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  70k under  APT&C Basic, Superannuation, NI /
Other Employee Costs – 70k under
Finance Services
(Strategy) – 42k under
The projected underspend is
due to anticipated level of
turnover during the year. 
Finance Services
(Transactions) – 40k
under
The underspend relates to
vacancies being reviewed in
line with service
requirements. 
Supplies and Services (15k) over Computer Equipment Purchase –
(15k) over
IT Services – (15k) over  The projected overspend is
due to greater than budgeted
IT costs. 
Administration Costs (20k) over Postages/Couriers – (20k) over Finance Services
(Transactions) – (20k
over)
The overspend in
Administration Costs is due
to higher than budgeted
postage costs for Council Tax
billing. 
Payments to Other
Bodies
(61k) over External Audit Fees – (58k) over Finance Services
(Strategy) – 58k over
The projected overspend is a
result of the expected uplift
for External Audit Fees. 
Financing Charges (20k) over IT Equipment Leasing Contract –
(20k) over
Finance Services
(Transactions) – (20k)
over
The overspend in Financing
Charges is due to higher than
budgeted IT leasing charges. 
Income  46k over
recovered
Other Income – 40k over recovered Personnel – 30k over
recovered
The over-recovery of income
relates to greater than
budgeted external income
and internal recharges
170

Page 171

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.) relating to Modern
Apprentices. 
171

Page 172

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Finance & Corporate Resources - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS OVERTIME 0 1 0 0
APT & C BASIC 26,659 5,123 26,499 160
APT & C OVERTIME 100 45 109 (9)
APT & C SUPERANNUATION 1,881 177 1,856 25
APT & C NIC 2,517 510 2,623 (106)
MANUAL BASIC 0 9 0 0
MANUAL NIC 0 1 0 0
OTHER EMPLOYEE COSTS 0 0 0 0
PENSION INCREASES 984 94 984 0
EMPLOYEE COSTS 32,141 5,960 32,071 70
PROPERTY COSTS
RATES
RENT 5 2 5 0
SECURITY COSTS 121 0 121 0
FIXTURE & FITTINGS 1,557 178 1,557 0
OTHER PROPERTY COSTS 2,183 0 2,183 0
PROPERTY COSTS 3,866 180 3,866 0
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 4,400 1,298 4,415 (15)
COMPUTER EQUIPMENT MAINTENANCE 2,327 599 2,327 0
I.T. EQUIPMENT MAINT - CONTRACT 595 128 595 0
I.T. ELECTRONIC MESSAGING 76 0 76 0
EQUIPMENT, APPARATUS AND TOOLS 0 16 0 0
SUPPLIES FOR CLIENTS 219 6 219 0
FURNITURE - OFFICE 1 (1) 1 0
MATERIALS 112 15 112 0
MATERIALS, APPARATUS AND EQUIPMENT 2 3 2 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 4 0 4 0
FOODSTUFFS - GENERAL 25 1 2 0
PROTECTIVE CLOTHING & UNIFORMS 2 0 25 0
OTHER SUPPLIES AND SERVICES 36 21 36 0
CATERING - OUTWITH CONTRACT 6 0 6 0
OUTSOURCED MAIL 175 34 175 0
SUPPLIES AND SERVICES 7,980 2,120 7,995 (15)
TRANSPORT AND PLANT
POOL CAR CHARGES - RENTAL 18 1 18 0
POOL CAR CHARGES - FUEL 3 0 3 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 1 0 1 0
FLEET SERVICE CHARGES - LEASING 2 1 2 0
FLEET SERVICE CHARGES - FUEL 1 0 1 0
FLEET SERVICE CHARGES - DRIVERS 9 0 9 0
TRANSPORT AND PLANT 34 2 34 0
172

Page 173

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Finance & Corporate Resources - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 524 19 524 0
TELEPHONES 1,567 318 1,567 0
MOBILE PHONES 177 15 177 0
ADVERTISING - RECRUITMENT 29 0 29 0
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 1 0 1 0
ADVERTISING - OTHER 123 19 123 0
POSTAGES/COURIERS 915 162 935 (20)
SMS MESSAGING 10 2 10 0
MEMBERSHIP FEES/SUBSCRIPTIONS 233 3 233 0
INSURANCE 140 0 140 0
MEDICAL COSTS 351 67 351 0
LEGAL EXPENSES 183 40 183 0
HOSPITALITY / CIVIC RECOGNITION 24 0 24 0
PAYPOINT AGENCY FEES 70 15 70 0
SECURITY UPLIFT FEES 2 0 2 0
OTHER ADMIN COSTS 1,604 194 1,604 0
MEMBERS ALLOWANCES 1,871 327 1,871 0
CONFERENCES - MEMBERS (incl associated costs) 11 (14) 11 0
CONFERENCES - OFFICIALS (incl associated costs) 6 0 6 0
TRAINING 762 113 762 0
VOLUNTEERS' EXPENSES 7 1 7 0
INTERNAL SUPPORT SERVICES ALLOCATION 68 0 68 0
ADMINISTRATION 8,678 1,281 8,698 (20)
PAYMENT TO OTHER BODIES
MANAGEMENT AND TECHNOLOGY TRAINING GRANT 0 1 0 0
YOUTH EMPLOYMENT TRAINING INITIATIVE 0 2 0 0
GRANTS TO VOLUNTARY ORGANISATIONS 679 255 652 27
PAYMENTS TO OTHER BODIES 2,562 666 2,592 (30)
EXTERNAL AUDIT FEES 600 0 658 (58)
ELECTION COSTS 0 30 0 0
PAYMENT TO OTHER BODIES 3,841 954 3,902 (61)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 28 36 28 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 249 29 249 0
PAYMENT TO CONTRACTORS 277 65 277 0
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 3,960 23,581 0
RENT REBATES 41,707 6,591 41,707 0
TRANSFER PAYMENTS 65,288 10,551 65,288 0
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 1 0 1 0
I.T. EQUIPMENT LEASING-CONTRACT 1,254 285 1,274 (20)
FINANCING CHARGES 1,255 285 1,275 (20)
TOTAL EXPENDITURE 123,360 21,398 123,406 (46)
173

Page 174

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Finance & Corporate Resources - Total Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
INCOME
NON RELEVANT GOVERNMENT GRANT (850) 0 (850) 0
STATUTORY ADDITIONS - COST OF COLLECTION (865) 0 (865) 0
RENT REBATES SUBSIDY (37,191) (2,755) (37,191) 0
RENT ALLOWANCE SUBSIDY (23,067) (837) (23,067) 0
DWP SUBSIDY (1,170) (187) (1,170) 0
DHP 0 853 0 0
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (150) (42) (150) 0
CONTRIBUTIONS FROM OTHER BODIES (105) (31) (105) 0
SALES - DEPARTMENTS OF THE AUTHORITY (20) 0 (20) 0
FEES AND CHARGES - GENERAL (4,346) (614) (4,352) 6
CHARGES TO HEALTH BOARDS (45) 0 (45) 0
FEES AND CHARGES - OTHER BODIES (222) (8) (222) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,482) (307) (2,482) 0
HOME LOANS REPAYMENTS (5) (3) (5) 0
BIRTH REGISTRATION (19) (4) (19) 0
DEATH REGISTRATION (73) (12) (73) 0
MARRIAGE STATUTORY FEES (95) (30) (95) 0
EXTRACT ISSUE (88) (18) (88) 0
MARRIAGES (49) (11) (49) 0
CITIZENSHIP CEREMONIES (11) (2) (11) 0
OTHER INCOME (8,007) (187) (8,047) 40
REALLOCATION OF CENTRAL SUPPORT COSTS (6,653) 0 (6,653) 0
REALLOCATION OF SUPPORT COSTS (25) 0 (25) 0
INCOME (85,538) (4,195) (85,584) 46
NET EXPENDITURE 37,822 17,203 37,822 0
174

Page 175

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 14 June 2024 (No 3)
Housing and Technical Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Housing Services 8.768 8.719 0.049 0.56% 0.433
Property Services 4.816 4.865 (0.049) -1.02% 10.283
Total Housing and Technical Resources 13.584 13.584 0.000 0.00% 10.716
10
175

Page 176

Housing and Technical Resources (excl HRA) Variance Analysis 2024/25 (Period 3) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 2,024k
under
APT&C Basic / Overtime /
Superannuation / National Insurance
– 2,024k under
Property Services –
1,157k under 
The variance relates to
vacancies which are actively
being recruited in line with
Service requirements. 
Property Services -
900k under 
The variance reflects the
current level of trade operatives
and overtime required to meet
service demands.   
Property Costs (1,494k)
over
Rates – 200k under  Property Services -
(200k) over 
The variance relates to an
anticipated underspend in rates
charges for Montrose House. 
Service Charges – (348k) over  Property Services -
(336k) over 
The overspend relates to the
cost of shopping centre service
charges which are not
recoverable from tenants. 
Other Accommodation Costs – (276k)
over 
Housing Services –
(276k) over 
The overspend relates to an
increase in homelessness stock
expenditure. 
Bed & Breakfast – (148k) over  Housing Services –
(148k) over 
The overspend relates to
greater than anticipated
demand for the service. 
Repairs & Maintenance – (536k) over  Housing Services –
(179k) over 
The overspend relates to an
increase in homelessness stock
expenditure. 
176

Page 177

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.)  
Property Services -
(357k) over 
The overspend relates to
additional expenditure in
property maintenance.  
Fixture & Fittings – (375k) over  Housing Services –
(375k) over 
This relates to the furniture
costs within homeless
temporary accommodation and
is demand led. 
Payment to
Contractors
525k under Payment to Private Contractors –
825k under 
Payment to External Consultants –
(300k) over 
Housing Services –
825k under 
Property Services –
(300k) over 
The underspend relates to
commissioned services for
Homelessness where
expenditure varies according to
service requirements. 
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet current service demands. 
Income  (1,017k)
under
recovered
Rental Income - (200k) under
recovered
Property Services -
(200k) under recovered
The under recovery relates to
the shopping centre income,
which is lower than budgeted
due to vacant units.  
Recovery from Capital/ Recharges -
Departments of the Authority - (914k)
under recovered 
Property Services -
(914k) under recovered 
The level of income recovered
varies depending on the current
workload and the timing of a
wide variety of projects. It is
offset by a reduction in
expenditure. 
177

Page 178

178

Page 179

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing & Technical Resources Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 37,086 6,596 35,730 1,356
APT & C OVERTIME 790 213 139 651
APT & C SUPERANNUATION 2,462 422 2,420 42
APT & C NIC 3,785 694 3,810 (25)
OTHER EMPLOYEE COSTS 489 31 489 0
PENSION INCREASES 602 69 602 0
ADDITIONAL PENSION COSTS 13 0 13 0
EMPLOYEE COSTS 45,227 8,025 43,203 2,024
PROPERTY COSTS
RATES 2,254 0 2,054 200
SCOTTISH WATER - UNMETERED CHARGES 12 (15) 12 0
SCOTTISH WATER - METERED CHARGES 241 40 268 (27)
RENT 1,731 520 1,743 (12)
SERVICE CHARGE 439 185 787 (348)
FACTORING CHARGES 9 0 9 0
OTHER ACCOMMODATION COSTS 2,274 103 2,550 (276)
BED AND BREAKFAST 27 15 175 (148)
PROPERTY INSURANCE 386 50 386 0
SECURITY COSTS 299 30 299 0
GROUND MAINTENANCE 52 0 52 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 1 10 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 2,913 126 3,449 (536)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 0 1 0 0
LIFE CYCLE MAINTENANCE 754 238 754 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 395 470 395 0
ADAPTIONS - INTERNAL CONTRACTORS 0 9 0 0
GAS MAINTENANCE COSTS 0 2 0 0
ELECTRICAL HEATING MAINTENANCE 0 7 0 0
HOUSING - RENT W/O UNLET PERIODS 712 89 736 (24)
HOUSING - RENT W/O BAD PERIODS 778 8 681 97
ASBESTOS 0 16 0 0
ELECTRICITY  - CONTRACT 1,446 150 1,497 (51)
ELECTRICITY  - NON CONTRACT 29 0 31 (2)
GAS 576 51 577 (1)
HEATING OIL 12 0 12 0
FIXTURE & FITTINGS 920 294 1,295 (375)
JANITOR SERVICE 164 152 164 0
CLEANING CONTRACT 407 400 407 0
CLEANING OUTWITH CONTRACT 0 9 0 0
CLEANING MATERIALS 10 2 10 0
WINDOW CLEANING 2 0 2 0
PEST CONTROL 6 0 18 (12)
REFUSE UPLIFT 405 2 412 (7)
REMOVAL & STORAGE COSTS 48 2 20 28
OTHER PROPERTY COSTS 556 203 556 0
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 985 1,113 0
ACCOMMODATION RECHARGE TO USERS 33 12 33 0
PROPERTY COSTS 19,013 4,157 20,507 (1,494)
179

Page 180

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing & Technical Resources Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 474 38 474 0
COMPUTER EQUIPMENT MAINTENANCE 6 0 6 0
I.T. EQUIPMENT MAINT-CONTRACT 222 1 223 (1)
EQUIPMENT, APPARATUS AND TOOLS 46 22 46 0
SMALL TOOLS 0 0 0 0
ADAPTATIONS FOR CLIENTS 500 45 500 0
FURNITURE - OFFICE 0 1 0 0
MATERIALS 12,330 1,103 12,330 0
STOCK/STORE ISSUES 0 153 0 0
AUDIO VISUAL 10 0 10 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0
TV LICENCES - EDUCATION 1 0 1 0
FOODSTUFFS - GENERAL 2 0 2 0
PROTECTIVE CLOTHING & UNIFORMS 44 5 44 0
OTHER SUPPLIES AND SERVICES 167 5 167 0
HEALTH AND SAFETY 1 0 1 0
CATERING - CONTRACT 1 0 1 0
CATERING - OUTWITH CONTRACT 0 2 0 0
OUTSOURCED MAIL 0 1 0 0
DELIVERY CHARGE 0 0 0 0
BULK BUYING DISCOUNT 0 (1) 0 0
SUPPLIES AND SERVICES 13,806 1,375 13,807 (1)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 4 0 0
PURCHASE OF PLANT 125 19 125 0
FLEET SERVICES - FUEL 1 4 1 0
POOL CAR RECHARGE - RENTAL CHARGE 98 6 98 0
POOL CAR RECHARGE - FUEL 26 0 24 2
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0
OTHER TRANSPORT COSTS 0 1 0 0
TRANSPORT INSURANCE 44 0 44 0
PLANT SERVICES 7 0 7 0
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 331 151 331 0
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 1 0
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 4 7 0
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 10 15 0
FLEET SERVICE CHARGES LEASING 1,402 88 1,402 0
FLEET SERVICE CHARGES HIRED VEHICLES 205 34 205 0
FLEET SERVICE CHARGES CONTRACT HIRE 48 0 48 0
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 117 46 117 0
FLEET SERVICE CHARGES FUEL 842 165 842 0
HIRE OF EXTERNAL PLANT 257 24 257 0
HIRE OF SCAFOLDING 1,077 198 1,077 0
HIRE OF SKIPS 33 76 33 0
EXTERNAL TRANSPORT CONTRACT 0 5 0 0
TAXI CHARGES - CONTRACTED 41 1 42 (1)
TRANSPORT AND PLANT 4,678 836 4,677 1
180

Page 181

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing & Technical Resources Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 81 20 81 0
TELEPHONES 94 (3) 95 (1)
MOBILE PHONES 40 0 38 2
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 7 0 7 0
ADVERTISING - OTHER 6 0 6 0
POSTAGES/COURIERS 21 3 21 0
SMS MESSAGING 0 0 0 0
MEMBERSHIP FEES/SUBSCRIPTIONS 12 3 12 0
INSURANCE 216 0 223 (7)
MEDICAL COSTS 16 2 16 0
LEGAL EXPENSES 18 4 20 (2)
PETTY OUTLAYS 12 0 12 0
HOSPITALITY / CIVIC RECOGNITION 2 0 2 0
BANK CHARGES 0 4 0 0
OTHER ADMIN COSTS 13 0 13 0
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 457 0
CENTRAL ADMINISTRATION 2,749 0 2,749 0
ADMINISTRATION 3,744 33 3,752 (8)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,019 7 2,019 0
OTHER LOCAL AUTHORITIES 0 5 0 0
PAYMENTS TO OTHER BODIES 1,120 94 1,164 (44)
SUPPORTING PEOPLE INTERNAL PROVIDER 1,129 280 1,129 0
SUPPORTING PEOPLE EXTERNAL PROVIDER 782 4 732 50
HOUSING ADMINISTRATION 885 57 885 0
ASSISTANCE TO HOME OWNERS (69) 196 (33) (36)
PRIVATE INDIVIDUALS - GENERAL 168 19 168 0
PAYMENT TO OTHER BODIES 6,034 662 6,064 (30)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 12,770 3,250 11,945 825
PAYMENT TO EXTERNAL CONSULTANTS 306 20 606 (300)
PAYMENT TO CONTRACTORS 13,076 3,270 12,551 525
TRUST FUND EXPENDITURE
TRANSFER PAYMENTS
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 154 6 154 0
INTEREST ON REVENUE BALANCES 2 0 2 0
FINANCING CHARGES 156 6 156 0
181

Page 182

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing & Technical Resources Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
TOTAL EXPENDITURE 105,734 18,364 104,717 1,017
INCOME
CONTRIBUTIONS FROM OTHER BODIES (2,361) (369) (2,361) 0
SALES - DEPARTMENTS OF THE AUTHORITY (460) 0 (460) 0
FEES AND CHARGES - GENERAL (581) (105) (694) 113
FEES AND CHARGES - DEPARTMENTS OF THE A (48) 0 (48) 0
RENTAL INCOME (4,127) (1,220) (3,927) (200)
HOUSE RENTS (6,007) (1,010) (5,994) (13)
OTHER INCOME (2,747) (475) (2,793) 46
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 (876) 0
REALLOCATION OF SUPPORT COSTS (1,629) 0 (1,580) (49)
RECOVERY FROM CAPITAL (31,422) (3,562) (27,721) (3,701)
RECHARGES - DEPARTMENTS OF AUTHORITY (41,892) (4,754) (44,679) 2,787
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 3,847 0 0
INCOME (92,150) (7,648) (91,133) (1,017)
NET EXPENDITURE 13,584 10,716 13,584 0
182

Page 183

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2024/25 (Period 3) 
There are no variances to report. 
10
183

Page 184

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing Revenue Account Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 11,629 2,228 11,629 0
APT & C OVERTIME 78 12 78 0
APT & C SUPERANNUATION 722 140 722 0
APT & C NIC 1,142 205 1,142 0
PENSION INCREASES 211 22 211 0
EMPLOYEE COSTS 13,782 2,607 13,782 0
PROPERTY COSTS
RATES 72 0 72 0
SCOTTISH WATER - UNMETERED CHARGES 4 0 4 0
SCOTTISH WATER - METERED CHARGES 8 2 8 0
RENT 6 0 6 0
SERVICE CHARGE 94 1 94 0
OTHER ACCOMMODATION COSTS 11 0 11 0
PROPERTY INSURANCE 2,160 0 2,160 0
SECURITY COSTS 55 1 55 0
GROUND MAINTENANCE 4,465 203 4,465 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 41,997 3,563 41,997 0
LIFE CYCLE MAINTENANCE 0 9 0 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 73 877 0
HOUSING - RENT FREE ACCOMMODATION 266 44 266 0
HOUSING - RENT W/O UNLET PERIODS 2,588 612 2,588 0
HOUSING - RENT W/O BAD PERIODS 3,743 5 3,743 0
ASBESTOS 139 25 139 0
GAS SOUNDNESS TESTING 0 3 0 0
ELECTRICITY  - CONTRACT 1,358 133 1,358 0
GAS 436 85 436 0
HEATING OIL 54 11 54 0
SOLID FUEL 4 2 4 0
FIXTURE & FITTINGS 58 33 58 0
JANITOR SERVICE 93 30 93 0
CLEANING CONTRACT 468 493 468 0
CLEANING MATERIALS 60 4 60 0
WINDOW CLEANING 16 32 16 0
PEST CONTROL 122 31 122 0
REFUSE UPLIFT 0 6 0 0
REMOVAL & STORAGE COSTS 14 4 14 0
OTHER PROPERTY COSTS 35 2 35 0
PROPERTY COSTS 59,203 5,407 59,203 0
184

Page 185

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing Revenue Account Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 1,365 13 1,365 0
I.T. EQUIPMENT MAINT-CONTRACT 74 0 74 0
EQUIPMENT, APPARATUS AND TOOLS 13 4 13 0
ADAPTATIONS FOR CLIENTS 0 14 0 0
FURNITURE - OFFICE 10 0 10 0
FURNITURE - GENERAL 0 4 0 0
MATERIALS 0 22 0 0
MATERIALS, APPARATUS AND EQUIPMENT 0 1 0 0
FOODSTUFFS - GENERAL 6 0 6 0
PROTECTIVE CLOTHING & UNIFORMS 12 0 12 0
LAUNDRY COSTS 16 0 16 0
OTHER SUPPLIES AND SERVICES 32 4 32 0
HEALTH AND SAFETY 15 0 15 0
SUPPLIES AND SERVICES 1,543 62 1,543 0
TRANSPORT AND PLANT
POOL CAR RECHARGE - RENTAL CHARGE 26 1 26 0
POOL CAR RECHARGE - FUEL 6 0 6 0
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0
OTHER TRANSPORT COSTS 0 3 0 0
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 158 12 158 0
STORAGE 4 0 4 0
TRANSPORT AND PLANT 195 16 195 0
ADMINISTRATION
PRINTING AND STATIONERY 79 51 79 0
BULK PRINTING 68 0 68 0
TELEPHONES 95 0 95 0
MOBILE PHONES 34 0 34 0
ADVERTISING - OTHER 12 0 12 0
POSTAGES/COURIERS 171 12 171 0
SMS MESSAGING 0 5 0 0
MEMBERSHIP FEES/SUBSCRIPTIONS 38 0 38 0
MEDICAL COSTS 25 4 25 0
LEGAL EXPENSES 6 11 6 0
PETTY OUTLAYS 4 0 4 0
HOSPITALITY / CIVIC RECOGNITION 0 0 0 0
GIRO BANK AGENCY FEES 4 0 4 0
PAYPOINT AGENCY FEES 13 7 13 0
INTERNET AGENCY FEES 3 0 3 0
OTHER ADMIN COSTS 15 1 15 0
CONFERENCES - OFFICIALS 7 0 7 0
INTERNAL SUPPORT SERVICES ALLOCATION 5,020 0 5,020 0
ADMINISTRATION 5,594 91 5,594 0
185

Page 186

South Lanarkshire Council
Revised Period 3 Period 3 Period 3
Housing Revenue Account Annual  Actual Forecast Forecast
Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 24/25 Outturn)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,909 451 2,909 0
OTHER LOCAL AUTHORITIES 0 0 0 0
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 3 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 1 31 0
PAYMENTS TO OTHER BODIES 32 82 32 0
PRIVATE INDIVIDUALS - GENERAL 0 18 0 0
PAYMENT TO OTHER BODIES 2,975 552 2,975 0
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 134 0 0
PAYMENT TO PRIVATE CONTRACTOR 80 3 80 0
PAYMENT TO EXTERNAL CONSULTANTS 20 34 20 0
PAYMENT TO CONTRACTORS 100 171 100 0
TRUST FUND EXPENDITURE
TRANSFER PAYMENTS
FINANCING CHARGES
INTEREST-DEBT CHARGES 10,729 4,518 10,729 0
DEPRECIATION-CAP CHARGES 0 0 0 0
I.T. EQUIPMENT LEASING-CONTRACT 67 2 67 0
CFCR 33,506 7,732 33,506 0
INTEREST ON REVENUE BALANCES (67) 0 (67) 0
FINANCING CHARGES 44,235 12,252 44,235 0
TOTAL EXPENDITURE 127,627 21,158 127,627 0
INCOME
SALES - DEPARTMENTS OF THE AUTHORITY (885) (57) (885) 0
FEES AND CHARGES - GENERAL (4,747) (1,324) (4,747) 0
RENTAL INCOME (461) 0 (461) 0
HOUSE RENTS (111,802) (18,787) (111,802) 0
LOCK UP RENTS (2,802) (697) (2,802) 0
INSURANCE RECOVERIES (250) (15) (250) 0
OTHER INCOME (1,734) (278) (1,734) 0
REALLOCATION OF SUPPORT COSTS (717) 0 (717) 0
YEAR END T/FER TO BALANCE SHEET (4,229) 0 (4,229) 0
INCOME (127,627) (21,158) (127,627) 0
NET EXPENDITURE 0 0 0 0
186

Page 187

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 31 March 2024 (No 15)
Social Work Resources
Committee Annual Forecast Annual Annual Budget Actual Variance
Budget for Year Forecast Forecast Proportion to Period 15 31/03/24
Before Variance Variance 31/03/24 31/03/24 Before
Transfers Before After Before Transfers
Transfers Transfers Transfers
Service Departments :- £m £m £m £m £m £m £m
Performance and Support Services 6.395 6.210 0.185 0.185 6.395 6.062 0.333 under
Children and Families 46.692 46.982 (0.290) (0.290) 46.692 47.160 (0.468) over
Adults and Older People 182.657 182.657 0.000 0.000 182.657 182.657 0.000 under
Justice and Substance Misuse 1.466 1.361 0.105 0.105 1.466 1.331 0.135 under
Position Before Transfer to Reserves 237.210 237.210 0.000 0.000 237.210 237.210 0.000
Transfers to Reserves as at 31/03/2024 0.000 0.000 0.000
Position After Transfers to Reserves at 31/03/2024 237.210 237.210 0.000
10
187

Page 188

Social Work Resources Variance Analysis 2023/24 (Period 15) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  (1,786k) over  Admin & Clerical Staff – 546k under  Performance and
Support – 328k under 
The underspends relate to 
staffing vacancies which are
being filled in 2024/25. 
Adult and Older People
– 147k under 
This underspend relates to
Scheduling Assistant
vacancies in Homecare,
which are being recruited in
2024/25. This is offset by
overtime costs in Managerial
Support Specialist Staff
(below). 
Managerial Support Specialist Staff -
(1,296k) over 
Performance and
Support – (64k) over 
This overspend is a result of
turnover being less than
anticipated to date. 
Children and Families –
(153k) over 
This overspend is a result of
turnover being less than
anticipated. 
Adult and Older People
– (1,210) over 
This overspend is a result of
turnover being less than
anticipated to date, and
overtime spend to cover the
Scheduling Assistant
vacancies in Homecare. 
Justice – 131k under  This is a result of vacancies
which are actively being
recruited in 2024/25. 
188

Page 189

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Basic Grade Social Workers – 1,754k
under 
Children and Families 
- 1,422k under 
This is a result of vacancies
which are actively being
recruited in 2024/25. 
Adult and Older People
– 246k under 
This is a result of vacancies
which are actively being
recruited in 2024/25. 
Justice – 87k under  This is a result of vacancies
which are actively being
recruited in 2024/25. 
Hospital Social Workers – (169k) over  Adult and Older People
– (169k) over 
This overspend is due to
additional posts being filled to
meet demand within the
hospital discharge team and
is offset by the underspend in
Social Workers. 
Instructors – 153k under  Adult and Older People
– 153k under 
This is a result of vacancies
which are being actively
recruited in 2024/25. 
Care Staff – 126k under  Children and Families –
(369k) over 
This overspend is due to the
level of overtime being
incurred to manage staff
absences due to sickness,
maternity leave etc. 
Adult and Older People
– 495k under 
This is a result of vacancies
which are actively being
recruited in 2024/25. 
189

Page 190

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Other Employee Costs – 66k under  Children and Families –
113k under 
The underspend reflects the
recruitment of staff funded
from the Whole Family
Wellbeing Fund.  Recruitment
is now complete. 
Adult and Older People
– (101k) over 
This overspend is in relation
to agency staff and is offset
by an underspend in Social
Workers. 
Additional Pension Costs – (88k) over  Adult and Older People
– (83k) over 
This overspend is attributable
to payments in lieu of notice /
ill health retirals and is offset
by underspends in basic pay. 
Property Costs 236k under Repairs & Maintenance – Internal
Contractors – (118k) over 
Adult and Older People
– (91k) over 
This planned overspend
relates to refurbishment
works to reduce floor
capacity. 
Gas - 155k under  Adult and Older People
– 153k under 
The underspend reflects a
reduction in consumption and
price. 
Cleaning & Janitorial Supplies - 144k
under 
Adult and Older People
– 145k under 
New funding allocated for
increased cleaning was less
than estimated due to
changes in specification. 
190

Page 191

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (cont.)  Other Property Costs - 96k under Children and Families –
51k under
This underspend is for
planned property
maintenance that will not take
place until the new financial
year. 
Supplies and Services 120k under Supplies for Clients – 108k under  Children and Families –
69k under 
The underspend is due to the
phased implementation of the
new family hubs.  All four
hubs are now fully
operational. 
Transport and Plant (332k) over Pool Car Charges – Rental – (50k)
over
Children and Families –
(68k) over
This is due to an increase in
pool car usage. 
Other Transport Costs – (248k) over  Children and Families –
(99k) over 
This reflects the
commitments in respect of
transporting children to and
from school or respite. 
Adult and Older People
– (151k) over 
This overspend is a result of
the increased cost of taxi
provision for services.  
Fleet Service Charges – Vehicle
Maintenance – (126k) over 
Adult and Older People
– (105k) over 
This overspend relates to
leasing charges for vehicles
within Home Care required to
deliver the service. 
191

Page 192

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and Plant
(cont.) 
Fleet Service Charges – Leasing –
61k under 
Adult and Older People
– 76k under
This underspend reflects the
costs of meeting current
service delivery
requirements. 
Administration 304k under Mobile Phones – 271k under  Adult and Older People
– 247k under 
This underspend is due to a
new contract being
implemented resulting in
lower charges. 
Payments to Other
Bodies
385k under Payments to Voluntary Organisations
– 103k under 
Children and Families –
100k under 
This underspend relates to
Supported Accommodation
which is being used to fund
pressures elsewhere within
the Service. 
Payment to Other Bodies – 501k
under
Children and Families –
302k under 
Adult and Older People
– 164k under 
This is a temporary funding
solution due to service
changes and is required in
full next financial year. 
This is an in year non-
recurring underspend. 
Private Individuals – General – 206k
under 
Children and Families –
209k under 
The underspend relates to
the Supported Carer and
short break service where
recruitment for the service is
ongoing.  
Social Work – Foster Parents – (259k)
over 
Children and Families –
(259k) over 
This overspend is a result of
the continuing requirement
for children’s external foster
placements. 
192

Page 193

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies (cont.) 
Social Work – Adoption Allowances –
(76k) over 
Children and Families –
(76k) over 
This overspend is due to an
increase in the number of
families being supported with
adoption allowances, post
adoption. 
Direct Payments – (75k) over Adult and Older People
– (75k) over
This overspend is due to an
increase in demand for Direct
Payments, under Self
Directed Support legislation.
Payment to
Contractors
(2,571k) over Long Term Care – (1,055k) over  Children and Families -
(1,674k) over 
This overspend is a result of
the continuing requirement
for children’s residential
external school placements. 
Adult and Older People
– 619k under 
This underspend relates to
Care Homes based on
current commitments and if
offset in part by the
overspend in Free Personal
Care. 
CET Allocations – Home Care -
(347k) over 
Adult and Older People
– (376k) over 
This overspend reflects the
current demand for the
external home care service. 
Respite – (188k) over  Children and Families –
(55k) over 
The overspend reflects the
demand for respite services
to support young people and
their families. 
193

Page 194

Subjective Head Variance  Subjective line Service / amount Explanation   
Adult and Older People
– (133k) over 
The overspend reflects the
demand for respite services
to support adult and older
users. 
Day Care – (151k) over  Adult and Older People
– (151k) over 
This overspend reflects the
current demand for the
external day care service. 
Home Support – (209k) over  Adult and Older People
– (209k) over 
This overspend reflects the
current demand for the
external home support
service.   
Free Personal Nursing Care – (228k)
over 
Adult and Older People
– (228k) over 
The overspend is a result of
an Increase in the number of
service users who are Free
Personal Nursing Care only. 
This overspend is offset with
underspend in long term
care. 
Respite awaiting long term care –
(342k) over 
Adult and Older People
– (342k) over 
The overspend reflects the
demand for respite services
to support adult and older
users who require long term
care. 
Payments to
Contractors (cont.) 
Payment to Contractor – Misc. – (50k)
over
Adult and Older People
– (65k) over 
This overspend reflects the
current demand for the
external home care service. 
194

Page 195

Subjective Head Variance  Subjective line Service / amount Explanation
Transfer Payments (255k) over Direct Assistance – (241k) over Children and Families –
(221k) over
This overspend relates to the
payment of kinship care
allowances where demand is
increasing.
Income  388k over
recovered 
Contributions from Other Bodies –
241k over recovered 
Fees and Charges - General – 137k
over recovered 
Children and Families –
290k over recovered 
Justice – (64k) under
recovered 
Adult and Older People
– 137k over recovered 
This is due to funding
received being greater than
budgeted in respect of
Unaccompanied Asylum-
Seeking Children and Care
Payments to Contractors. 
This under recovery is offset
by an underspend in
employee costs (as
mentioned above). 
This over recovery relates to
non-recurring income
received in respect of
recovery of prior year care
costs from service users. 
* The underlined variances represent new variances since the last report.
195

Page 196

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
EMPLOYEE COSTS
TEACHERS OVERTIME 0 1 (1) over
ADMIN & CLERICAL STAFF - APT&C BASIC 5,668 4,952 716 under
ADMIN & CLERICAL STAFF - APT&C OVERTIME 0 202 (202) over
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 992 938 54 under
ADMIN & CLERICAL STAFF - APT&C NIC 409 431 (22) over
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 24,246 24,620 (374) over
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 119 810 (691) over
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 4,518 4,590 (72) over
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 2,563 2,722 (159) over
BASIC GRADE SOCIAL WORKERS BASIC 12,031 10,558 1,473 under
BASIC GRADE SOCIAL WORKERS OVERTIME 44 92 (48) over
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 2,254 2,070 184 under
BASIC GRADE SOCIAL WORKERS NIC 1,324 1,179 145 under
HOSPITAL SOCIAL WORKERS BASIC 448 571 (123) over
HOSPITAL SOCIAL WORKERS OVERTIME 0 18 (18) over
HOSPITAL SOCIAL WORKERS SUPERANNUATION 86 98 (12) over
HOSPITAL SOCIAL WORKERS NIC 46 62 (16) over
INSTRUCTORS BASIC 1,434 1,298 136 under
INSTRUCTORS SUPERANNUATION 243 239 4 under
INSTRUCTORS NIC 129 116 13 under
CARE STAFF - APT&C BASIC 18,757 18,197 560 under
CARE STAFF - APT&C OVERTIME 815 1,241 (426) over
CARE STAFF - APT&C SUPERANNUATION 3,275 3,320 (45) over
CARE STAFF - APT&C NIC 1,854 1,817 37 under
HOME CARERS BASIC 27,809 27,457 352 under
HOME CARERS OVERTIME 1,977 2,004 (27) over
HOME CARERS SUPERANNUATION 5,038 4,777 261 under
HOME CARERS NIC 2,840 2,811 29 under
TRAVEL AND SUBSISTENCE 394 333 61 under
OTHER EMPLOYEE COSTS 1,240 1,174 66 under
PENSION INCREASES 328 309 19 under
ADDITIONAL PENSION COSTS 0 88 (88) over
EMPLOYEE COSTS 120,881 119,095 1,786 under
196

Page 197

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
PROPERTY COSTS
RATES 385 381 4 under
SCOTTISH WATER - UNMETERED CHARGES 35 4 31 under
SCOTTISH WATER - METERED CHARGES 178 211 (33) over
RENT 523 553 (30) over
BED AND BREAKFAST 0 1 (1) over
PROPERTY INSURANCE 292 297 (5) over
SECURITY COSTS 3 4 (1) over
GROUND MAINTENANCE 3 0 3 under
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 5 (5) over
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 0 118 (118) over
LIFE CYCLE MAINTENANCE 0 2 (2) over
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 63 69 (6) over
GAS HEATING LEASE COSTS 0 1 (1) over
ELECTRICITY  - CONTRACT 926 879 47 under
GAS 1,056 901 155 under
FIXTURE & FITTINGS 0 1 (1) over
CLEANING CONTRACT 386 390 (4) over
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 328 184 144 under
HEALTH & HYGIENE MATERIALS 91 135 (44) over
WINDOW CLEANING 12 10 2 under
PEST CONTROL 1 0 1 under
REFUSE UPLIFT 47 44 3 under
REMOVAL & STORAGE COSTS 5 4 1 under
OTHER PROPERTY COSTS 204 108 96 under
PROPERTY COSTS 4,538 4,302 236 under
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 557 560 (3) over
COMPUTER EQUIPMENT MAINTENANCE 41 10 31 under
I.T. EQUIPMENT MAINT-CONTRACT 205 174 31 under
I.T. ELECTRONIC MESSAGING 102 150 (48) over
EQUIPMENT, APPARATUS AND TOOLS 131 88 43 under
SMALL TOOLS 4 4 0
AIDS & ADAPTIONS 2,201 2,221 (20) over
SUPPLIES FOR CLIENTS 371 263 108 under
FURNITURE - OFFICE 24 41 (17) over
FURNITURE - GENERAL 15 32 (17) over
FURNISHINGS (INCL. CROCKERY & LINEN) 18 18 0
MATERIALS 11 17 (6) over
WILDLIFE AND FLORA 0 0 0
MATERIALS, APPARATUS AND EQUIPMENT 0 23 (23) over
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC 0 3 (3) over
TV LICENCES - EDUCATION 0 1 (1) over
FOODSTUFFS - GENERAL 0 2 (2) over
PROVISIONS - GENERAL 206 268 (62) over
FOOD PURCHASES WITHIN CONTRACT SERVICE 535 511 24 under
BEVERAGES 63 47 16 under
SCHOOL MILK 38 37 1 under
PROTECTIVE CLOTHING & UNIFORMS 701 702 (1) over
LAUNDRY COSTS 6 6 0
OTHER SUPPLIES AND SERVICES 51 64 (13) over
CATERING - CONTRACT 413 365 48 under
CATERING - OUTWITH CONTRACT 64 30 34 under
OUTSOURCED MAIL 0 1 (1) over
DELIVERY CHARGE 0 1 (1) over
BULK BUYING DISCOUNT 0 (2) 2 under
SUPPLIES AND SERVICES 5,757 5,637 120 under
197

Page 198

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 2 (2) over
POOL CAR CHARGES-RENTAL 128 178 (50) over
POOL CAR CHARGES-FUEL 42 8 34 under
POOL CAR CHARGES-ADDITIONAL COSTS 7 2 5 under
OTHER TRANSPORT COSTS 792 1,040 (248) over
INSURANCE 24 21 3 under
LICENCES 0 1 (1) over
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 73 199 (126) over
FLEET SERVICE CHARGES - ASSET MODIFICATIONS 0 2 (2) over
FLEET SERVICE CHARGES - LEASING 530 469 61 under
FLEET SERVICE CHARGES - HIRED VEHICLES 24 7 17 under
FLEET SERVICE CHARGES - CONTRACT HIRE 4 25 (21) over
FLEET SERVICE CHARGES - ROAD FUND LICENCES/MOT 29 58 (29) over
FLEET SERVICE CHARGES - FUEL 357 378 (21) over
FLEET SERVICE CHARGES - DRIVERS 2,665 2,620 45 under
HIRE OF EXTERNAL VEHICLES 7 0 7 under
HIRE OF SKIPS 0 1 (1) over
PUPIL TRANSPORT - OTHER 10 13 (3) over
TRANSPORT AND PLANT 4,692 5,024 (332) over
ADMINISTRATION
PRINTING AND STATIONERY 102 104 (2) over
TELEPHONES 210 200 10 under
MOBILE PHONES 393 122 271 under
ADVERTISING - RECRUITMENT 4 4 0
ADVERTISING - OTHER 12 6 6 under
POSTAGES/COURIERS 55 50 5 under
MEMBERSHIP FEES/SUBSCRIPTIONS 53 39 14 under
INSURANCE 27 27 0
MEDICAL COSTS 26 63 (37) over
LEGAL EXPENSES 297 314 (17) over
HOSPITALITY / CIVIC RECOGNITION 7 9 (2) over
OTHER ADMIN COSTS 87 35 52 under
CONFERENCES - OFFICIALS (incl associated costs) 4 1 3 under
TRAINING 40 34 6 under
INTERNAL SUPPORT SERVICES ALLOCATION 410 415 (5) over
ADMINISTRATION 1,727 1,423 304 under
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 15 38 (23) over
OTHER LOCAL AUTHORITIES 25 46 (21) over
GRANTS TO VOLUNTARY ORGANISATIONS 23 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 2,860 2,757 103 under
PAYMENTS TO OTHER BODIES 2,703 2,202 501 under
PAYMENTS TO HEALTH BOARD 1,458 1,433 25 under
PRIVATE INDIVIDUALS - GENERAL 1,144 938 206 under
SOCIAL WORK - FOSTER PARENTS 6,782 7,041 (259) over
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 90 4 under
SOCIAL WORK - ADOPTION ALLOWANCES 775 851 (76) over
DIRECT PAYMENTS 10,048 10,123 (75) over
PAYMENT TO OTHER BODIES 25,927 25,542 385 under
198

Page 199

South Lanarkshire Council
REVISED
Social Work Resources  - Total ANNUAL PERIOD 15 PERIOD 15
BUDGET ACTUAL VARIANCE Over/
Expenditure / Income Variance Trends 2023/2024 SLC 23/24 2 TO DATE AMOUNT Under
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR - DEFAULT 1,510 1,510 0
PAYMENT TO PRIVATE CONTRACTOR - LONG TERM CARE 65,572 66,627 (1,055) over
PAYMENT TO PRIVATE CONTRACTOR - CET ALLOCATION - HOME CARE 31,779 32,126 (347) over
PAYMENT TO PRIVATE CONTRACTOR - RESPITE 2,660 2,848 (188) over
PAYMENT TO PRIVATE CONTRACTOR - DAY CARE 1,082 1,233 (151) over
PAYMENT TO PRIVATE CONTRACTOR - HOME SUPPORT 22,229 22,438 (209) over
PAYMENT TO PRIVATE CONTRACTOR - FREE PERSONAL NURSING CARE 8,577 8,805 (228) over
PAYMENT TO PRIVATE CONTRACTOR - RESPITE AWAIT' LONG TERM CARE 0 342 (342) over
PAYMENT TO PRIVATE CONTRACTOR - DAY RELATED ACTIVITIES INCL RESIDENTIAL PLACEMENTS3,775 3,825 (50) over
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 115 112 3 under
SLC MANAGED 0 4 (4) over
PAYMENT TO CONTRACTORS 137,299 139,870 (2,571) over
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 4,493 4,734 (241) over
SECTION PAYMENTS 83 97 (14) over
TRANSFER PAYMENTS 4,576 4,831 (255) over
FINANCING CHARGES
LEASING CHARGES - FINANCE 1 0 1 under
LEASING CHARGES - OPERATIONAL 0 1 (1) over
I.T. EQUIPMENT LEASING-CONTRACT 400 461 (61) over
FINANCING CHARGES 401 462 (61) over
TOTAL EXPENDITURE 305,798 306,186 (388) over
INCOME
NON RELEVANT GOVERNMENT GRANT (7,744) (7,777) 33 over rec
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (25,085) (25,080) (5) under rec
CONTRIBUTIONS FROM OTHER BODIES (699) (940) 241 over rec
SALES - SALE OF MEALS (14) (20) 6 over rec
FEES AND CHARGES - GENERAL (5,920) (6,057) 137 over rec
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (656) (679) 23 over rec
CHARGES TO HEALTH BOARDS (27,571) (27,610) 39 over rec
FEES AND CHARGES - OTHER BODIES (19) (18) (1) under rec
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (218) (182) (36) under rec
RENTAL INCOME (27) (22) (5) under rec
OTHER INCOME (235) (176) (59) under rec
REALLOCATION OF SUPPORT COSTS (400) (415) 15 over rec
INCOME (68,588) (68,976) 388 over rec
NET EXPENDITURE 237,210 237,210 0
199

Page 200