Agenda Document Pack - Financial Resources Scrutiny Forum - 12/02/2026

South Lanarkshire Council · 12 February 2026
Back to Financial Resources Scrutiny Forum — 12 February 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 04 February 2026 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 12 February 2026
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Grant Ferguson (Chair), Julia Marrs (Depute Chair), Mathew Buchanan, Colin Dewar, Monique
Equi, Ross Gowland, Gavin Keatt, Richard Lockhart, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Financial Resources Scrutiny Forum held on 11
December 2025 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Monitoring 
3a  Capital Budget Monitoring 2025/2026 - General Fund Capital Programme
Report dated 26 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
7 - 28 
3b  Capital Budget Monitoring 2025/2026 - Housing Capital Programme
Report dated 26 January 2026 by the Executive Director (Finance
and Corporate Resources).  (Copy attached) 
29 - 34 
4 Revenue Budget Monitoring 2025/2026
Report dated 4 February 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
35 - 50 
5 Revenue Budget Monitoring 2025/2026 - Detailed Resource Analysis
Report dated 26 January 2026 by the Executive Director (Finance
and Corporate Resources).  (Copy attached) 
51 - 116 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
2

Page 3

FINANCIAL RESOURCES SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 11 December 2025 
Chair:
Councillor Grant Ferguson 
Councillors Present:
Councillor Mathew Buchanan, Councillor Colin Dewar, Councillor Ross Gowland, Councillor Gavin
Keatt, Councillor Richard Lockhart, Councillor Julia Marrs (Depute), Councillor Carol Nugent 
Councillor’s Apology:
Councillor Monique Equi 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); E-A McGonigle, Administration Adviser; A Norris,
Administration Assistant; L O’Hagan, Head of Finance (Strategy)
Housing and Technical Resources
A Roxburgh, Project Manager 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Financial Resources Scrutiny Forum held on 13 November
2025 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3a Capital Budget Monitoring 2025/2026 – General Fund Capital Programme 
A report dated 20 November 2025 by the Executive Director (Finance and Corporate
Resources) was submitted on the position of the General Fund Capital Programme 2025/2026
for the period 1 April to 3 October 2025. 
The revised General Services Capital Programme for 2025/2026 totalled £67.712 million, as
detailed in Appendix B to the report.  The revised programme included adjustments totalling a
net decrease of £1.274 million, as detailed in Appendix A to the report, which were agreed by
the Executive Committee on 3 December 2025. 
The 2025/2026 programme had been increased by £1.000 million to reflect the budget for a new
First Stop temporary accommodation project, as agreed at the Executive Committee on 5
November 2025.  The balance of funding of £0.250 million was required in 2026/2027. 
The programme spend and funding for the General Fund was summarised in Appendix D to the
report and also showed a forecast for the financial year of £67.712 million. 
Actual spend to 3 October 2025 was £17.616 million and actual funding received at 3 October
2025 was £23.203 million.
2
3

Page 4

The physical progress achieved with the General Fund Capital Programme 2025/2026 at 3
October 2025 was detailed in appendices E to G of the report. 
Councillor M Buchanan requested clarification on the information contained in Appendix C to the
report in relation to Roads, Transport and Fleet and also Office Accommodation (Housing and
Technical Resources).  The Head of Finance (Strategy) advised that she would provide the
information to him. 
Councillor Lockhart requested further information in relation to the First Stop temporary
accommodation.  The Head of Finance (Strategy) agreed to contact Housing and Technical
Resources for the information and provide it to him. 
The Forum decided: that the physical and financial progress of the 2025/2026
General Fund Capital Programme be noted. 
[Reference: Minutes of 13 November 2025 (Paragraph 3a) and Minutes of the Executive
Committee of 5 November and 3 December 2025 (Paragraphs 4)] 
In terms of Standing Order No 14, the Chair adjourned the meeting during this item of business at
2.15pm due to technical difficulties.  The meeting reconvened at 2.24pm and Councillor Nugent was
not present 
3b Capital Budget Monitoring 2025/2026 – Housing Capital Programme 
A report dated 20 November 2025 by the Executive Director (Finance and Corporate
Resources) was submitted on the position of the Housing Capital Programme 2025/2026 at 3
October 2025. 
The revised Housing Capital Programme for 2025/2026 totalled £87.740 million.  Programmed
funding for the year also totalled £87.740 million.  The budget, along with a detailed breakdown
of the funding sources, was included in Appendix A to the report. 
The profile of spend on the New Build programme reflected the Scottish Government approval
timescales, where some projects had now commenced later in the year.  Any reduction in spend
as a result of this would be offset by an opportunity to accelerate the Housing Investment
Programme spend on External Fabrics and Energy Efficiency projects from 2026/2027.  Any
borrowing not used in 2025/2026 in relation to the new build programme would be carried
forward into 2026/2027 to allow completion of the projects. 
The predicted spend position for the Housing and Technical Resources’ Capital Programme for
2025/2026 was £87.740 million.  Spend to 3 October 2025 totalled £33.147 million and actual
funding received was £33.147 million. 
The physical progress achieved with the Housing Capital Programme 2025/2026 at 3 October
2025 was detailed in Appendix B to the report. 
The Forum decided: that the physical and financial progress of the Housing
Capital Programme be noted. 
[Reference: Minutes of 13 November 2025 (Paragraph 3b) and Minutes of the Executive
Committee of 3 December 2025 (Paragraph 4)]
4

Page 5

4 Revenue Budget Monitoring 2025/2026 
A report dated 20 November 2025 by the Executive Director (Finance and Corporate
Resources) was submitted on the position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April to 3 October 2025 and a projection for the year
to 31 March 2026. 
As at 3 October 2025, the projected outturn position on the General Fund Revenue Account and
Housing Revenue Account was a breakeven position, as detailed in Appendix 1 to the report. 
Information was provided on the following key budget areas:- 
 pay award
 packaging extended producer responsibility 
The Forum decided: 
(1) that the projected breakeven position on the General Fund Revenue Account for
2025/2026, and the actual spend as at 3 October 2025, as detailed in paragraph 4.1 and
Appendix 1 of the report, be noted; and 
(2) that the projected breakeven position on the Housing Revenue Account for 2025/2026,
and the actual spend as at 3 October 2025, as detailed in Section 5 and Appendix 2, be
noted. 
[Reference:  Minutes of 13 November 2025 (Paragraph 4)] 
5 Revenue Budget 2025/2026 – Detailed Resource Analysis 
A report dated 20 November 2025 by the Executive Director (Finance and Corporate
Resources) was submitted comparing actual expenditure against budgeted expenditure for the
period 1 April to 3 October 2025. 
Appendices A to F to the report provided the following information for each Resource and the
Housing Revenue Account:- 
 an Executive Summary showing the top level position for each of the Services within the
Resource and the Housing Revenue Account as at 3 October 2025
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services as at 3 October 2025
 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings as at 3 October 2025 
The Forum decided: that the position as at 3 October 2025 be noted. 
[Reference: Minutes of 13 November 2025 (Paragraph 5)] 
6 Urgent Business 
There were no items of urgent business. 
5

Page 6

6

Page 7

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2025/2026 - General Fund
Capital Programme 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
♦ update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2025
to 29 December 2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:-
[recs]
(1) that the physical and financial progress of the 2025/2026 General Fund
Capital Programme be noted; and
(2) that £0.020 million of Ward 7 Local Action Fund monies be allocated to the
Darwin Road Playpark (section 4.2), be noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 29 December 2025
from both a financial and physical perspective. 
3.2. Appendices A to C show the financial position of the General Fund Capital
Programme, with the physical progress detailed in appendices D to F – as they are
split into Build, Non-Build and Roads. 
4. General Fund Capital Programme 2025/2026
4.1. 2025/26 Budget:  The revised Capital Programme for 2025/2026 totals £67.712
million as shown in Appendix A. This revised programme consists of the base budget
plus carry forward projects and adjustments which have been agreed by the
Executive Committee up to and including its meeting on 4 February 2026. 
4.2. The budget for the year includes an allocation of £0.020 million of Local Action Fund
monies. Local Ward Members (in Ward 7) have agreed that these funds will now be
spent on Darwin Road Playpark. 
4.3. The Walk Wheel Cycle Trust (formerly SUSTRANS) have confirmed that South
Lanarkshire will receive £0.810 million for improvements along the existing NCN75
Clyde walkway path and to update the traffic signal at St Stephens Avenue/East
Kilbride Road Crossing, Rutherglen. Works are underway to progress this project and
maximise spend this financial year, however, given the timing of the award, this budget
3a
7

Page 8

will be added to the 2026/2027 programme with any spend achieved in 2025/2026
managed from the funding available. 
4.4. In order to maximise use of space in corporate buildings, the first-floor former coffee
shop space will be refurbished to a meeting area consisting of dedicated meeting pods,
bringing the area back into productive use. The budget required is £0.050 million and
this will be funded from within the Prioritised Urgent Investment budget in the existing
programme and will have no impact on the total programme. 
4.5. The funding available to support the programme also totals £67.712 million and is
detailed in Appendix C. 
4.6. 2025/2026 Forecast:  The programme spend and funding for the General Fund is
summarised in Appendix C.  As noted in 4.1, the total capital spending programme
for the year is £67.712 million. 
4.7. Appendix C shows a forecast for the financial year of £65.962 million. 
4.8. The forecast for this financial year reflects anticipated spend on 2 projects: East
Kilbride Town Centre (£0.800 million) where the demolition costs are lower than
anticipated, and Hamilton Junctions (£0.950 million) as works planned for Wellhall
Road have been reprogrammed to begin in spring 2026. 
4.9. 2025/2026 Actual Position:  Actual spend incurred to the 29 December 2025 totals
£35.036 million. 
4.10. Actual funding received to 29 December 2025 is £41.194 million.  Relevant officers
will continue to closely monitor the generation of all income including receipts. 
4.11. Leisure and Culture Transformation Fund Programme:  The Transformation
Fund has a total budget of £13.000 million with forecast spend of £10 million
expected in 2025/2026.   
4.12. Physical progress through the year is going well.  Projects complete to date include
Fitness Studio Modernisation and Gym Upgrades across the area (in John Wright
Sports Centre, Carluke Leisure Centre, Hamilton Water Palace and Lanark
Lifestyles), as well as Library reprovisions at Hillhouse and Earnock, Greenhills,
Blantyre, and Forth.   
4.13. Other finished projects include the pitch replacement at Whitemoss Recreation Area,
the pool, changing and fabric upgrades at Coalburn Leisure Centre, the football
pavilion toilet upgrade and lift replacement at Hamilton Palace, and the internal
upgrades at the Murray Owen Centre. 
4.14. Work is continuing across a number of other projects including the conservatory roof
at Calderglen Country Park, the upgrades to the dryside changing and showers in
Blantyre Leisure Centre, the upgrade works at Lanark Memorial Hall, and the toilets
at Chatelherault Country Park. 
4.15. In addition, the Fitness Studio Modernisation & Gym Upgrade programme continues
with works commenced at Dollan Aqua Centre, Blackwood Community Wing and
South Lanarkshire Lifestyles Eastfield. 
8

Page 9

5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are included in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
26 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council, 26 February 2025
 Executive Committee, 4 February 2026 
List of Background Papers
 Capital Ledger prints to 29 December 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
9

Page 10

10

Page 11

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 29 DECEMBER 2025 
£m  
Total Base Budget (including carry forward from 2024/2025)  67.712 
Proposed Adjustments – Period 10 0.000  
Total Revised Budget  67.712   
2025/26 
Budget 
Period 10
Proposed
Adjustments
Revised 
2025/26 
Budget 
Resource  £m £m £m
Community & Enterprise 55.159 - 55.159
Education 5.007 - 5.007
Finance & Corporate 0.645 - 0.645
Housing & Technical 6.564 - 6.564
Social Work 0.337 - 0.337
TOTAL CAPITAL PROGRAMME 67.712 - 67.712 
3a
11

Page 12

APPENDIX B
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 29 DECEMBER 2025 
Resource Name 
Annual
Budget
£000 
2024/25
C/F
£000
Profiling
/Adjs
£000
Total
Original
Budget
£000 
Proposed
Adjs
£000 
Proposed
Slippage
£000 
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
1,893 978 253 3,124 478 (941) 2,661 2,661 0  568 
Enterprise &  
Sustainable Dev
32,674 7,271 (15,883) 24,062 8,630 (3,404) 29,288 27,538 1,750 16,008
Roads, Transport
& Fleet
14,655 2,820 3,014 20,489 2,722 0 23,211 23,211 0 12,583
Resource 
Total
49,222 11,069 (12,616) 47,675 11,830 (4,345) 55,160 53,410 1,750 29,159 
Education
Growth /
Accommodation
Pressures
1,603 709 1,370 3,682 566 (1,063) 3,185 3,185 0 1,864
ICT
Developments
1,300 46 0 1,346 0 0 1,346 1,346 0 769
Free School
Meals
0 473 3 476 0 0 476 476 0 384
Resource 
Total
2,903 1,228 1,373 5,504 566 (1,063) 5,007 5,007 0 3,017           
Finance & Corporate
IT Services 300 245 0 545 150 (50) 645 645 0 280
Resource 
Total  300  245  0  545  150  (50)  645  645  0  280           
Housing & Technical
Office Accom 6,000 1,930 180 8,110 (4,258) 0 3,852 3,852 0 1,582
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 (1,000) 0 0 0 0 0
Other Housing 645 677 (304) 1,018 1,694 0 2,712 2,712 0 661
Resource 
Total
7,645 2,607 (124) 10,128 (3,564) 0 6,564 6,564 0 2,243  
Social Work
SWIS Plus 146 31 160 337 0 0 337 337 0 337
Resource Total  146    31  160  337  0  0  337  337  0  337           
Overall Total 60,216 15,180 (11,207) 64,189 8,982 (5,458) 67,712 65,962  1,750 35,036 
12

Page 13

APPENDIX C 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 29 DECEMBER 2025 
2025/26
Original
Estimate
inc C/F 
2025/26
Revised
Budget 
2025/26
Forecast
Spend 
2025/26
Forecast
Variance 
2025/26
Actual to
29/12/25      
Expenditure £m £m £m £m £m      
General Fund Programme 64.188 67.712 65.962 1.750 35.036       
Income
2025/26
Budget
2025/26
Revised
Budget  
2025/26
Actual
To
29/12/25         
£m         £m   £m
Prudential Borrowing 17.192 17.425   0.000
Developers Contributions 1.965 4.679   3.239
Partners  0.450 3.682   1.172
Scottish Government:     
- Capital Grant 27.467 28.352   28.352 
- Vacant and Derelict Land 
- Place Based Investment
1.477
0.589
1.502
0.589  
0.994
0.602
Levelling Up Fund 7.700 7.200   6.135
Capital Receipts 0.700 0.700   0.700
Specific Reserves 0.038 1.284   0.000
Revenue Contribution 6.610     2.299   0.000      
TOTAL FUNDING 64.188 67.712   41.194 
13

Page 14

Appendix D
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2025/2026 
BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 29 DECEMBER 2025 (PERIOD 10)
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status               
Projects Complete  - 5 8 11 24 35 40 48 56 73 - - - -
Projects on Programme  - 124 172 170 166 159 156 149 145 130 - - - -
Projects Behind
Programme 
- 1 0 1 3 1 1 0 0 0 - - - -
Projects Altered Brief/
Programme 
- 1 3 3 2 5 4 3 4 2 - - - -
Projects Held  - 12 10 10 7 8 8 9 8 8 - - - - 
- 143 193 195 202 208 209 209 213 213 0 0 0 0               
Project Status               
Design Feasibility  - 79 126 126 112 113 111 73 70 60 - - - -
Sketch Design  - 3 2 1 1 1 1 1 1 1 - - - -
Detailed Design  - 1 1 2 2 3 2 1 1 1 - - - -
Production Information  - 4 5 5 8 8 8 10 10 9 - - - -
Tendering  - 36 36 37 35 32 31 25 26 26 - - - -
On Site  - 15 15 13 20 16 16 51 49 43 - - - -
Complete  - 5 8 11 24 35 40 48 56 73 - - - - 
- 143 193 195 202 208 209 209 213 213 0 0 0 0 
14

Page 15

Appendix D
(Page 2)
General Services Capital Programme 2025/2026 
Build Variance Explanations 
Project Name Status Variance Explanation
- - - 
15

Page 16

Appendix E
(Page 1) 
GENERAL FUND CAPITAL PROGRAMME 2025/2026                     
NON-BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 29 DECEMBER 2025 (PERIOD 10) 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Number of Projects           
Carried Forward 24/25
Programme - - - 28 31 31 31 31 31 31                   
Approved from 25/26
Programme - - - 12 15 16 16 17 17 17                   
Total Projects Currently
Reported - - - 40 46 47 47 48 48 48                   
Number of Projects                           
Projects Completed - - - 3 3 5 8 11 11 11                   
Projects Ahead of
Programme - - - 0 0 0 0 0 0 0                   
Projects on Programme - - - 37 43 42 39 35 35 35                   
Projects Behind
Programme - - - 0 0 0 0 0 0 0   
Projects, Altered
Brief/Programme - - - 0 0 0 0 0 0 0                   
Projects On Hold  - - - 0 0 0 0 2 2 2                   
- - - 40 46 47 47 48 48 48     
16

Page 17

General Services Capital Programme 2025/2026                             Appendix E
Non-Build Executive Summary – Project Status                                      (Page 2)
Project Status
SLLC - Booking and Admission System On programme
Ash Die Back On programme
Langlands Boardwalk Complete
Chatelherault Allotments Complete
Alexander Hamilton Memorial Park – Woodland Management On Hold
Nature Restoration Fund On programme
Renewal of Play Parks On programme
Glenaffeoch Road Play Area On programme
Greenhall Replacement Bridge On Hold
White Bridge Replacement, Chatelherault Country Park (cost design) On programme
Coalburn Tennis Court redevelopment On programme
Headstone Remedial Works On programme
Braidwood Play Area Redevelopment On programme
Wooddean Phase 2 Complete
Clyde Walkway repairs On programme
Country parks upgrades On programme
Composting Pilot On programme
Disposable dishware reduction pilot Complete
McKirdy Park Complete
Alexander Hamilton Memorial Fountain - Stonehouse Park Complete
Calderglen Country Park - One Way System & Infrastructure Complete
Springhall Community Centre - Upgrade Complete
Three Rivers / Clydesdale Way On programme
Country Parks Masterplan - Feasibility On programme
Calderglen Country Park - Pump Track On programme
John Cummings – Outdoor Facilities On programme
Energy Efficiency Measures Feasibility TACT Hall On programme
East Kilbride Town Centre Masterplan On programme
SLC Industrial Infrastructure - Energy Efficiency  On programme
Carnwath Community and Business Enterprise HUB On programme
Shawfield Remediation and Development On programme
Coalyard Housing On programme
Outdoor Space – Lanark On programme
Hamilton Town Centre Masterplan On programme
Hamilton Town Square On programme
Vacant & Derelict Land On programme
School uniform recycling pilot On programme
Schools ICT On programme
Education Digital Futures On programme
IT Infrastructure Refresh On programme
Electronic Document Records Management System - Phase 2 On programme
Audio Visual Upgrade - Council Chambers Complete
Public Switch Telephone Network / Alarms (Analogue to Digital) On programme
Lock Up Areas  Complete
Gypsy Travellers Sites Complete
Central Energy Efficiency Fund  On programme
Replacement SWISS Plus IT System On programme
SLC Website Upgrade On programme
17

Page 18

Appendix F
(Page 1) 
GENERAL SERVICES CAPITAL PROGRAMME 2025/2026 
ROADS EXECUTIVE SUMMARY 
PERIOD ENDED 29 DECEMBER 2025 (PERIOD 10)                             
1 2 3 4 5 6 7 8 9 10 11 12 13              
Number of Projects             
Total Projects Currently Reported - - - 158 165 184  186 186 186 218   
Programme Status             
Projects Complete - - - 36 69 80 87 87 87 113   
Projects on Programme - - - 122 87 95   90 90 90 95   
Projects Behind Programme - - - 0 0 0     0 0 0 0   
Projects, Altered Brief / Programme - - - 0 0 0 0 0 0 1   
Projects Still to Commence - - - 0 9 9 9 9 9 9   
- - - 158 165 184 186 186 186 218   
Project Status             
Briefing - - - 19 19 16 15 15 15 16   
Production Information - - - 86 59 69 67 67 67 67   
Billing - - - 0 0 0 0 0 0 0   
Tendering - - - 0 1 2 2 2 2 1   
On Site - - - 17 17 17 15 15 15 21   
Complete - - - 36 69 80 87 87 87 113   
- - - 158 165 184  186 186 186 218   
18

Page 19

Appendix F
(Page 2) 
General Services Capital Programme 2025/2026 
Roads Variance Explanations 
Project Name Status Variance Explanation
- - - 
19

Page 20

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Craigend Road, Auldhouse 1 1
Peel Road, Thorntonhall 1 1
Stroud Road, East Kilbride - Safety Barrier 1 1
Glen Moriston, East Kilbride 1 1
Spey Terrace/Grove, East Kilbride                        1 1
A727 Busby Road, East Kilbride 1 1
East Mains Road, East Kilbride 1 1
A749 Glasgow Road , East Kilbride (Kingsgate) 1 1
Mallard Terrace, East Kilbride 1 1
A726 Glasgow Road, Chapelton 1 1
Falkland Park, East Kilbride 1 1
Glen Doll, East Kilbride 1 1
Crutherland Highway, East Kilbride 1 1
Dale Avenue, East Kilbride 1 1
Redwood Drive, East Kilbride 1 1
Tantallon Park, East Kilbride 1 1
Eider Place, East Kilbride 1 1
Calderwood Road, Rutherglen 1 1
Cathkin By Pass, Rutherglen 1 1
Hallside Boulevard, Cambuslang 1 1
A724 Cambuslang Road, Rutherglen 1 1
Surface Dressing & Preventative patching Schemes
Millwell Road, Auldhouse 1 1
Markethill Road, East Kilbride 1 1
Muirburn Road, Glassford 1 1
Breckonridge Highway, Strathaven 1 1
Hallside Road/Manse Brae, Cambuslang 1 1
Newton Brae, Cambuslang 1 1
Calder Road/Westburn Road, Cambuslang 1 1
Manse Brae, Cambuslang 1 1
Westburn Road, Cambuslang - Surface Dressing 2025/2026 1 1
Breckonridge Highway, Strathaven - Surface Dressing 2025/2026 1 1
Newton Brae, Cambuslang - Surface Dressing 2025/2026 1 1
Millwell Road, East Kilbride - Surface Dressing 2025/2026 1 1
Markethill Road, East Kilbride - Surface Dressing 2025/2026 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title
20

Page 21

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching and Minor asset improvements
Cairns Road 1 1
Bogleshole Road 1 1
Stonelaw Road 1 1
Westburn Road 1 1
Eaglesham Road, East Kilbride, Peel Road 1 1
Eaglesham Road, East Kilbride, Hairmyres Train Station roundabout 1 1
Quarry Road, East Kilbride 1 1
Musgrove Place, East Kilbride 1 1
Philipshill Road, East Kilbride 1 1
Kirktonholme Road 1 1
Buchandyke Road 1 1
Gilmourton 1 1
The Mid Road (C133 1 1
Lime Road (WPL A71 – B743) 1 1
Green Street 1 1
Newton Highway 1 1
Footways
Hill View, East Kilbride 1 1
Telford Rd (Denholm to Sinclair) 1 1
Maxwellton Rd (Aikman to Blacklands) 1 1
Kirkton Park, East Kilbride 1 1
Green Street, Strathaven 1 1
Ballochmyle and Lochlea, EK 1 1
Mossneuk Ave (Greenhills to Forth), East Kilbride 1 1
Seymour Green, East Kilbride 1 1
Nithsdale, East Kilbride 1 1
Burnside Road, Rutherglen 1 1
Glasgow Rd, Cambuslang 1 1
Mentieth Drive, Rutherglen 1 1
21

Page 22

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Hamilton Area
Strategic Schemes 
Strathaven Road, Hamilton *b/f from 2024 1 1
Queens Drive, Hamilton 1 1
Main Street, Uddingston 1 1
Hunter Road / Margaret Road, Hamilton 1 1
Keir Hardie Road, Larkhall 1 1
Shaws Road, Larkhall 1 1
Avon Street, Hamilton 1 1
A724 Glasgow Road, Blantyre 1 1
Livingstone Gardens / Hope Crescent, Larkhall 1 1
Field Road, Larkhall 1 1
Abercorn Drive, Hamilton 1 1
Muir Street/Nursery Place, Blantyre 1 1
Maitland Bank, Larkhall 1 1
Graham Street, Hamilton 1 1
Muir Street, Hamilton 1 1
Alamada Street, Hamilton 1 1
Swisscott Avenue roundabout 1 1
High Blantyre Road, Blantyre 1 1
Broomfield Road, Netherburn 1 1
Annsfield Road 1 1
Hill Street, Hamilton 1 1
Strategic Infrastructure  (Drainage Schemes)
Meikle Earnock Road 1 1
A72 Lanark Road 1 1
Millheugh Road, Larkhall, Broomelton Road to Glenavon Mews 1 1
Millheugh Road, Larkhall, Glenavon Mews 1 1
Preventative Maintenance Schemes
Sandford Road (Phase 2)  (*Preparatory patched in 2024) 1 1
Newhousemill Road, Hamilton 1 1
Candermill & Marlage Road 1 1
Preparatory Patching for 2026/27 schemes 1 1
22

Page 23

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching and Minor Asset Improvements
Swisscott Avenue, Hamilton  (*b/f from 2023/24 - Due to Utility Works) 1 1
Blantyre farm Road, Uddingston (*b/f from 2024 -Lining & AntiSkid 1 1
Calder Street, Blantyre 1 1
Violet Crescent, Stonehouse 1 1
Canderside Toll, Larkhall 1 1
Carlisle Road, Birkenshaw, Larkhall 1 1
Union street, Hamilton 1 1
John Street, Blantyre 1 1
Burnblea Gardens, Hamilton 1 1
Carriageway patching and various minor works 1 1
Footways
Marswood Green / Rosslyn Court, Hamilton 1 1
Alder Avenue, Hamilton 1 1
Lochalsh Place, Blantyre 1 1
Machan Road, Larkhall 1 1
Melrose Street, Hamilton 1 1
Strathaven Road, Stonehouse 1 1
Carlisle Road, Birkenshaw, Larkhall 1 1
Hill Street, Hamilton 1 1
Castle Avenue, Bothwell (Phase 1) 1 1
Castle Avenue, Bothwell (Phase 2) 1 1
Haddow Street, Hamilton 1 1
Woodside Walk, Hamilton 1 1
Lowther Crescent, Stonehouse  1 1
Limekilnburn Road, Quarter 1 1
23

Page 24

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Clydesdale Area
Strategic Schemes 
A73 St John's Kirk 1 1
A706 Lanark (Patching) 1 1
A702 Elvanfoot 1 1
A721 Carnwath Road, Carluke 1 1
B7011 Brownlee Road 1 1
B7078 Cairn Lodge Services 1 1
New Trows Road, Lesmahagow 1 1
Stobilee Road, Lanark 1 1
Mousebank Road, Lanark 1 1
A73 Hyndford Road 1 1
B7011 Brownlee Road, Law 1 1
Anstruther Street, Law 1 1
New Kayes Road, Auchenheath 1 1
B7078 Carlisle Road, Blackwood 1 1
C1 Maudslie Road, Carluke 1 1
Coalburn Road/Bellfireld Road, Coalburn 1 1
A70 at Pretsmill 1 1
Jerviswood, Lanark 1 1
Hillview, Symington 1 1
Nemphlar Moor 1 1
Laverockhall, Lanark 1 1
Strategic Infrastructure  - Drainage Schemes
Spittal Road, Carnwath 1 1
A73 Roberton @Littlegill 1 1
B7018 Dillarburn 1 1
Vere Road, Kirkmuirhill 1 1
Tower Road, Douglas 1 1
Preventative Maintenance Schemes
A70 Lang whang 1 1
A72 Symington 1 1
B740 Crawfordjohn 1 1
B7078 Parkhead to Millrig 1 1
C29 Carstairs Junction 1 1
Strathaven Road, Lesmahagow 1 1
B7015 Climpy Road, Forth 1 1
Roberton Back Road, Dunsyre 1 1
B7055 Sornfallow 1 1
Auchnatroch, Dillarburn 1 1
Preparatory Patching 1 1
24

Page 25

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching and Minor Asset Improvements
Mousemill Road, Lanark 1 1
Yieldshields Road, Carluke 1 1
C29 Pettinain 1 1
C14 Andershaw Road 1 1
Nursery Avenue, Douglas 1 1
Kirkstyle Car Park, Biggar 1 1
Foulford Road, Lesmahagow (Drainage) 1 1
Foulford Road, Lesmahagow (Surfacing) 1 1
B7078 Woodpark 1 1
B7086 Boghead 1 1
Daer Water Road, Elvanfoot 1 1
B7086 Burnfoot, Auchenheath 1 1
Hawksland, Lesmahagow 1 1
Blair Road, Crossford 1 1
Dillarburn Road, Lesmahagow 1 1
C37 Harelaw A706 to A70 Tarbrax 1 1
Carriageway patching and various minor works 1 1
Footways
Southfield Road, Blackwood 1 1
B7078 Carlisle Road 1 1
School Road/Strathaven Road, Lesmahagow 1 1
Main street, Forth 1 1
Hyndshaw View/Castlehill Crescent, Law 1 1
Carlisle Road, Crawford 1 1
CLIMATE EMERGENCY FUNDING
Warm Mix / Low Carbon Asphalt Trial
Wilton Road, Carluke 1 1
Murrayhill, East Kilbride 1 1
Victoria Street, Blantyre 1 1
Traffic Signal Upgrades
Ayr Road Crossroads, Ashgill  - Junction Design, MOVA upgrade 1 1
25

Page 26

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
ROADS REFURBISHMENT BUDGET
Structures projects
Bothwell Bridge, Hamilton ~ Scour Protection Works 1 1
Millheugh Bridge, Larkhall ~ Refurbishment works 1 1
Elvanfoot Bridge ~ Refurbishment works 1 1
Cander Bridge ~ Joint refurbishment 1 1
Cornwall Street footbridge 1 1
East Kilbride Structures (Cont/ from 2024/25) 1 1
Duke St MSCP 1 1
Burnside Bridge, Rutherglen (Porkect led by Network Rail) 1 1
Traffic and Transportaion
Various minor works, lining & signing works 1 1
Vehicle Actived Signs ~ Upgrades 1 1
Vehicle and Pedestrian counters ~ Upgrades 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure 1 1
BRIDGES
Clyde Bridge ~ Remedial works and retention release payment only 1 1
SCOTTISH GOVERNMENT TIER 1 FUNDING (FORMERLY CWSR)
Pedestrian and cycle improvements
Hairmyres P&R ~ Active Travel Works 1 1
Redwood Drive ~ junction upgrade 1 1
Strathaven Road / Calderglen ~ Active Travel 1 1
Columbie Junction ~ Active travel 1 1
Stonelaw Road ~ Continuous footways 1 1
Toucan Crossing Installations
Stewartfield Way ~ Toucan crossings 1 1
LOCAL AUTHORITY DIRECT AWARD
Walking Routes to Schools and Town Centres 1 1
NCN74 from Chatelherault to Hamilton ~ Vegetation/scrub clearance 1 1
CITY DEAL PROJECTS
Cathkin ~ Complementary works (various minor works) 1 1
Stewartfield Way 1 1
Greenhills ~ Loss of value payments / Monitoring 1 1
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Hairmyres P&R 1 1
26

Page 27

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 10
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Lanark Interchange 1 1
Congestion Reduction Measures
High Blantyre Road / Hunthill Road / Douglas Street Blantyre ~ bus priority 1 1
COMMUNITY BUS FUND
Land Purchase at Lanark Interchange (remainder funding to Interchange) 1 1
INVESTMENT FUND
Safe Routes ~  Stonelaw Road ~ Continuous footways 1 1
BUS INFRASTRUCTURE FUND
Bus Priority Fusion Traffic Control System 1 1
Real Time Information Displays (Hamilton / Rutherglen) 1 1
Various bus stop enhancement (Hamilton / Blantyre/Clydesdale) 1 1
ROAD SAFETY IMPROVEMENT FUND
A721 Newbigging to Elsricke 1 1
B743 Strathaven to Council Boundary 1 1
A730 Mill Street at Main Street/ Burnhill Street signalised junction, Rutherglen 1 1
A724 Main Street at/near Bridge Street, Cambuslang 1 1
RoadTrace ~ connected vehicle data 1 year licence and support 1 1
CYCLING SCOTLAND
Cycle shelter installations @ 7 Primary Schools 1 1
Cycle shelter upgrades 1 1
16 67 0 1 21 113 113 95 0 1 9
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2025/2026 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April 2025 to 29
December 2025.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 29 December 2025
from both a financial and physical perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B. 
4. 2025/26 Housing Capital Programme 
4.1. 2025/26 Budget:  The revised Housing Capital Programme for the year is £87.740 million
as approved by the Executive Committee on 4 February 2026.   
4.2. Programmed funding for the year also totals £87.740 million.  The budget, along with a
detailed breakdown of the funding sources is included in Appendix A to this report.   
4.3. 2025/2026 Forecast:  The predicted spend position for the Housing Programme for this
financial year is £87.740 million.   
4.4. As noted previously, the profile of spend on the New Build programme has been
affected by delays in the Scottish Government approval timescales, where some
projects have now commenced later in the year.  Any reduction in spend as a result of
this will be offset by an opportunity to accelerate the Housing Investment Programme
(HIP) spend on External Fabrics and Energy Efficiency projects from 2026/2027. 
4.5. Any funding (borrowing) not used in 2025/2026 in relation to the new build programme
will be carried forward into 2026/2027 to allow completion of the projects.   
3b
29

Page 30

4.6. 2025/2026 Actual Position:  Spend to 29 December 2025 on the Housing Capital
Programme amounts to £52.315 million.   
4.7. As at 29 December 2025, £52.315 million of funding had been received. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications 
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
26 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 4 February 2026 
List of Background Papers 
 Capital Ledger prints to 29 December 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
30

Page 31

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2025/26
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 29 DECMBER 2025 
2025/26
Annual
Budget 
2025/26
Forecast
Spend
2025/26
Forecast
Variance
2025/26
Actual to
29/12/25 
£m £m £m £m
Expenditure 
2025/26 Budget  87.740  87.740  -  52.315     
2025/26
Annual
Budget  
2025/26
Actual to
29/12/25 
£m   £m
Income         
Capital Funded from Current Revenue 35.633   23.824
Prudential Borrowing 21.061   16.073
Scottish Government Specific Grant:    
- New Build 24.726   9.492
- Open Market Purchase Scheme 6.000   2.651
- Mortgage to Rent 0.120   0.060
Climate Emergency Fund 0.200   0.000
Other Income 0.000   0.215 
87.740   52.315 
31

Page 32

Appendix B
(Page 1)
HOUSING CAPITAL PROGRAMME 2025/2026
EXECUTIVE SUMMARY
PERIOD ENDED 29 DECEMBER 2025
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Programme Status               
Projects Complete  - 9 13 15 19 24 29 30 36 40 - - - -               
Projects on Programme - 100 104 106 110 98 92 98 92 86 - - - -               
Projects Behind
Programme 
- 5 2 0 0 1 1 1 3 2 - - - -               
Projects Altered
Brief/Programme
- 1 3 6 0 5 6 1 1 4 - - - -               
Projects Held  - 16 17 17 16 20 20 18 12 12 - - - - 
- 131 139 144 145 148 148 148 144 144 0 0 0 0               
Project Status              
Design Feasibility  - 34 40 43 40 37 36 33 25 25 - - - -               
Sketch Design  - 6 5 2 1 1 1 1 1 1 - - - -               
Detailed Design  - 2 2 1 2 2 2 2 1 1 - - - -               
Production Information - 18 17 21 21 20 19 19 16 12 - - - -               
Tendering - 20 23 23 23 27 27 23 25 23 - - - -               
On Site  - 42 39 39 39 37 34 40 40 42 - - - -               
Complete - 9 13 15 19 24 29 30 36 40 - - - -               
- 131 139 144 145 148 148 148 144 144 0 0 0 0 
32

Page 33

Appendix B
(Page 2) 
Housing Capital Programme 2025/2026 
Build Variance Explanations 
Project Name Status Variance Explanation
Toryglen Road – Window and Door Replacements Behind Programme The programme of works has been
delayed due to 28-day abandonment
notice served to property. 
Various Lock Ups – Refurbishment works Behind Programme The programme of works has been
delayed due to access issues and
poor weather. 
33

Page 34

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 25/26 0 2.462 7.801 14.379 19.032 27.399 32.898 39.037 45.174 52.218 58.358 64.497 70.636 85.948
Revised Budget 25/26 0 2.462 7.801 14.379 19.032 27.525 33.147 39.407 45.148 52.315 58.583 64.85 71.117 87.74
Actual 25/26 0 2.462 7.801 14.379 19.032 27.525 33.147 39.407 45.148 52.315 0 0 0 0
0
10
20
30
40
50
60
70
80
90
100
£ Millions
HRA Capital Expenditure Profile Graph 25/26
34

Page 35

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 10 - 1 April 2025
to 29 December 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the members of the Financial Resources Scrutiny Forum of the forecast
for the year to 31 March 2026 for the Council’s General Fund Revenue Account
and Housing Revenue Account, and the actual spend position for the period 1
April 2025 to 29 December 2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that previously approved transfers to reserves totalling £38.108 million
(section 4.2), be noted;
(2) that the proposed transfers to reserves totalling £16.339 million (section 4.2
and Appendix 2), be noted;
(3) that including the position across Resources, Corporate Items and Council
Tax, and the transfers to Reserves, the Council’s outturn underspend of
£3.579 million for 2025/2026 (section 4.3), be noted;
(4) that the proposal that the anticipated underspend of £0.040 million on
Community Grants be transferred to food banks (section 4.7), be noted;
(5) that the non-recurring underspend of £1.762 million in the delegated budget to
the IJB be retained by them and held in reserves for their use in future years
(section 4.10), be noted;
(6) that the proposed use of £3.579 million underspend for 2025/2026 as set out
in section 4.17, be noted; and
(7) that the projected breakeven position on the Housing Revenue Account for
2025/2026 (section 6 and Appendix 4 of the report), be noted. 
3. Background
3.1. This overview report will summarise the 2025/2026 Probable Outturn position for the
Council’s General Fund Revenue Account to 31 March 2026.  An Executive
Summary is provided in Section 4, while Section 5 provides the detail of the General
Fund outturn position including details of proposed transfers to Reserves.  Section 6
provides the position on the Housing Revenue Account.  Given the timing of the
Local Government Settlement this year, this paper does not include the impact of
any revenue grant redeterminations on the 2025/2026 Budget and Probable Outturn. 
Any impact will be reflected in the next monitoring report to this Committee as
appropriate.  
4
35

Page 36

3.2. When establishing the Probable Outturn position for the year, Resources were asked
to take all known commitments into account.  This report details the anticipated
spend for the current year (detailed figures shown in Appendix 1) and proposes
funds to be transferred to reserves for future commitments (Appendix 2).  The report
will also detail the position after the proposed transfers to reserves (Appendix 3) for
those known commitments required in the next financial year.  Finally, Appendix 4
provides the Housing Revenue Account position. 
4. Executive Summary – 2025/2026 General Services Probable Outturn 
4.1. This report and appendices provide a detailed analysis of the Council’s financial
position.  While the full detail and background is provided in the report, the summary
position including the key highlights is detailed in this Executive Summary. 
4.2. The outturn position before any new proposed Transfers to Reserves is shown in
detail in Appendix 1 and summarised in Table 1.  Table 1 shows the initial
underspend of £19.918 million.  This is after the previously identified / approved
Transfers to Reserves totalling £38.108 million previously agreed by Committee in
relation to: 
• the underspend arising from the Loans Fund review (£13.349 million, as agreed
at Executive Committee, June 2025)
• the timing of spend on 2025/2026 Investments (£13.859 million, detailed in the
Executive Committee, June 2025), 
• the use of the 2025/2026 underspend arising from teacher numbers (£4.200
million, as agreed at Executive Committee, August 2025),
• the timing of spend on the Waste and Recycling Services pEPR budget (£2.200
million, as agreed at Executive Committee, December 2025), and
• the core monies released by Packaging Extended Producer Responsibility
(pEPR) funding to be used for the Budget Strategy (£4.500 million, as agreed at
Executive Committee, December 2025). 
Table 1: Analysis of Outturn Position 
Position
Before
Transfers to
Reserves
Proposed
Transfers to
Reserves
Position
After
Transfers to
Reserves 
£m £m £m
Resource Position (section 4.4) 7.290 6.364 0.926
Loan Charges (section 4.13) 2.459 0.358 2.101
Corporate Items (section 4.14) 9.839 9.417 0.422
Council Tax (section 4.15) 0.330 0.200 0.130
Probable Outturn Position 19.918 16.339 3.579 
4.3. The figures in Table 1 show proposed transfers to reserves totalling £16.339 million. 
The result is a Council underspend of £3.579 million.  The previously identified
Transfers to Reserves (£38.108 million) and the proposed Transfers to Reserves
(£16.339 million) are shown (Appendix 2).  Each of the lines in Table 1 are detailed
below. 
4.4. Resources: As covered in Table 1, Resources are reporting a combined
underspend position of £0.926 million.  This position across Resources is after
proposed Transfers to Reserves totalling £6.364 million and are detailed in
Appendix 2.  These are covered in more detail in sections 5.1 to 5.9, with a summary
of each Resource taken in turn below. 
36

Page 37

4.5. Community and Enterprise Resources are showing an underspend of
£0.348 million after proposed Transfers to Reserves in relation to the timing of spend
on Front Line First, contributions to the Strategic Waste Fund for planned works,
works to upgrade air conditioning for Refuse Collection Vehicles and funds to
support Local Growth Fund transition. 
4.6. Education Resources are showing a breakeven position after a Transfer to
Reserves for planned Pupil Equity Fund expenditure and Additional Support for
Learning which will be incurred by the end of the school year (which falls into
financial year 2026/2027). 
4.7. Finance and Corporate Resources are showing an underspend of £0.578 million
after Transfers to Reserves to cover costs for increased premiums anticipated within
the Insurance Fund.  There is also an anticipated underspend of £0.040 million on
Community Grants this financial year.  It is proposed that this underspend be
transferred to food banks as discussed at Executive Committee on 3 December, and
this proposal is included in the Resource position presented.  The payments will be
made to constituted organisations in the third sector, to support the Council’s priority
of tackling poverty. 
4.8. Housing and Technical Resources are showing a break-even position after a
Transfer to Reserves for the First Stop Accommodation project within Homelessness
services as planned.  This position also includes spend on feasibility studies for the
ongoing Estates Strategy. This can be managed within the current year outturn due
to greater than anticipated income levels in Building Services. 
4.9. Social Work Resources is showing a break-even position after all proposed
Transfers to Reserves / commitments.  Within this is the Adults and Older People
budget which is delegated to the Integrated Joint Board (IJB) and includes Transfers
to Reserves for Transformational Residential Care (£0.500 million) and a contribution
to The Promise (£0.750 million) to further augment the support for young people
transitioning from Children and Family Services to Adult Services over the following
two years.  It also includes a £1.762 million commitment in relation to the element of
the budget delegated to the IJB – this is effectively an underspend on the delegated
budget.   
4.10. These monies are part of the Council’s contribution to the IJB and could have been
retained by the Council, however this assumed commitment allows the IJB to retain
this non-recurring underspend within their reserves earmarked for future costs.  This
is in line with the approach to integrating Health and Social Care budgets.  It is
proposed that these monies will be treated as a creditor of the council (i.e. money we
have to pass to them) and will be available for use by the IJB. 
4.11. The Social Work Resources non-delegated Services position is also breakeven, after
Transfers to Reserves.  This includes the position on Children and Families and
includes a Transfer to Reserves for residual pressures within the Service which are
anticipated to continue into 2026/2027 while the budget recovery plan continues to
be implemented. 
4.12. All Resource transfers to Reserves are shown in Appendix 2.  
37

Page 38

4.13. Loan Charges: An in-year underspend of £2.101 million (after a Transfer to
Reserves) is anticipated in 2025/2026.  This underspend is mainly due to a reduction
in the borrowing requirement over the period 2024/2025 to 2025/2026 due to the
revised profiling of General Fund Capital expenditure across these years.  Details
are provided in sections 5.10 to 5.12. 
4.14. Corporate Items: There is a net underspend of £0.422 million for Corporate Items
after known commitments and including proposed Transfers to Reserves totalling
£9.417 million in relation to Service Concessions, Pay Award, Packaging Extended
Producer Responsibility (pEPR) and Central Energy Efficiency Fund (CEEF) /
Renewable Heat Incentive (RHI) / Feed In Tariff (FIT) Income (sections 5.13 to 5.15). 
4.15. Council Tax / Council Tax Reduction Scheme (CTRS): There is a net over
recovery of Council Tax / CTRS of £0.130 million (section 5.16). 
4.16. Summary and Proposals:  As noted in Table 1, within section 4.2, there is an
overall underspend of £3.579 million after Transfers to Reserves. 
4.17. In terms of this £3.579 million, the following was agreed at the Executive
Committee on 4 February 2026:- 
• that £1.000 million of the underspend be transferred to reserves to allow the
Council to provide financial support to contribute towards the response to
questions posed by the Marmot initiative.  This £1.000 million will allow the
Council to contribute towards the cost of taking forwards activity to progress
Marmot findings including any required staffing and implementation costs
(Marmot Place for South Lanarkshire).
• that £0.040 million of the underspend be set aside to support the continuation of
the Winter Wishes programme within Children and Families in 2026/2027.
• that £0.100 million of the underspend be transferred to reserves for Commercial
Feasibility costs.
• that £0.400 million of the underspend be set aside to support the findings of the
Third Sector Review to contribute to the external medium grants allocation
available for the next two years beyond 2026/2027.
• that £0.300 million be allocated to Heat Network / Decarbonisation projects.
• that the remaining £1.739 million underspend be transferred to reserves for
budget considerations in future years. 
4.18. Further details of the Probable Outturn position are provided in the remainder of the
report. 
5. 2025/2026 General Services Probable Outturn – Resources and Corporate Lines
5.1. Total Resource Position:  The outturn position for Resources, before any Transfers
to Reserves, is an underspend of £7.290 million. 
5.2. Resources are proposing Transfers to Reserves totalling £6.364 million. These are
detailed in Appendix 2. Taking these transfers into account results in a net
Resources’ breakeven position. Details across Resources are shown in Table 2.    
38

Page 39

Table 2: Resource Outturn 
Outturn
Before
Transfers to
Reserves
£m
Proposed
Transfers to
Reserves 
£m
Outturn
After
Transfers to
Reserves
£m 
over/
under
£m
Community and Enterprise 1.466 1.118 0.348 under
Education 0.478 0.478 0.000 -
Finance and Corporate 0.878 0.300 0.578 under
Housing and Technical 0.123 0.123 0.000 -
Social Work – Delegated to IJB 1.250 1.250 0.000 -
Social Work – Non-Delegated 3.095 3.095 0.000 -
Joint Boards 0.000 0.000 0.000 - 
7.290 6.364 0.926 under 
5.3. Community and Enterprise Resources are showing an underspend of £1.466
million before transfers to reserves.  This mainly relates to underspends in employee
costs across the Services due to vacant posts which are currently being recruited. 
The Resource is showing an underspend of £0.348 million after proposed Transfers
to Reserves in relation to the timing of spend on Front Line First, contributions to the
Strategic Waste Fund for planned works, works to upgrade air conditioning for
Refuse Collection Vehicles and funds to support Local Growth Fund transition.
Within the position, the Resource have identified the potential for additional Roads
surplus to be generated in the Revenue budget, as a result of capital works.  This will
be reported at year end. 
5.4. Education Resources are showing a breakeven position after a Transfer to
Reserves for planned Pupil Equity Fund expenditure and Additional Support for
Learning which will be incurred by the end of the school year (which falls into
financial year 2026/2027). 
5.5. Finance and Corporate Resources are showing an underspend of £0.878 million
due to the reduced costs associated with Empty Property Relief.  A Transfer to
Reserves is proposed to cover costs for increased premiums anticipated within the
Insurance Fund (£0.300 million).  This results in a Resource underspend of £0.578
million.  Within this position is an anticipated underspend of £0.040 million on
Community Grants which is offset by the proposal to use this for in-year to support
local food banks, as discussed at Executive Committee on 3 December.  The
payments will be made to constituted organisations in the third sector, to support the
Council’s priority of tackling poverty. 
5.6. Housing and Technical Resources are showing a breakeven position after a
Transfer to Reserves for the First Stop Accommodation project within Homelessness
services as planned.  This position also includes spend on feasibility studies for the
ongoing Estates Strategy.  This can be managed within the current year outturn due
to greater than anticipated income levels in Building Services. 
5.7. Social Work Resources are showing a break-even position after all proposed
Transfers to Reserves / commitments.  Within this is the Adults and Older People
budget which is delegated to the Integrated Joint Board (IJB) and includes Transfers
to Reserves for Transformational Residential Care (£0.500 million) and a contribution
to The Promise (£0.750 million) to further augment the support for young people
transitioning from Children and Family Services to Adult Services over the following 
39

Page 40

two years.  It also includes a £1.762 million commitment in relation to the element of
the budget delegated to the IJB – this is effectively an underspend on the delegated
budget.  This underspend relates to the current levels of vacancies across
residential, daycare, homecare and social workers, offset in part by pressures across
the service. 
5.8. These monies are part of the Council’s contribution to the IJB and could have been
retained by the Council, however this assumed commitment allows the IJB to retain
this non-recurring underspend within their reserves earmarked for future costs.  This
is in line with the approach to integrating Health and Social Care budgets.  It is
proposed that these monies will be treated as a creditor of the council (i.e. money we
have to pass to them) and will be available for use by the IJB. 
5.9. The Social Work Resources non-delegated Services is a break-even position after
£3.095 million of Transfers to Reserves.  This includes the position on Children and
Families and includes a Transfer to Reserves for residual pressures within the
Service which are anticipated to continue into 2026/2027 while the budget recovery
plan continues to be implemented.   
5.10. Loan Charges:  An underspend of £2.459 million is anticipated in 2025/2026 before
Transfers to Reserves.  This underspend is mainly due to a reduction in the
borrowing requirement over the period 2024/2025 to 2025/2026 due to the revised
profiling of General Fund Capital expenditure across these years. 
5.11. It is proposed that £0.358 million be transferred to reserves to be utilised in future
years in line with borrowing for service concession arrangements.  This will be
required to be drawn down from 2027/2028 (as approved at South Lanarkshire
Council, January 2023). 
5.12. This leaves an underspend after Transfers to Reserves of £2.101 million. 
5.13. Corporate Items: An underspend of £9.839 million is anticipated in 2025/2026. This
is mainly due to the following: 
a. Service Concessions (PPP): the forecast is a £4.388 million underspend for this
financial year due to the accounting treatment on leases.  The paper presented
on the 2026/2027 to 2027/2028 Revenue Budget Gap and Savings Proposals for
2026/2027 (Executive Committee, November 2025) explained that we could take
an earlier than anticipated benefit in the 2026/2027 Budget Gap (£2.800 million)
due to a change in interest rates and indexation since the initial calculations were
undertaken.  However, it also meant that the savings we had previous budgeted
across 2028/2029 and 2029/2030 were no longer available.  The change in the
interest rates referred to in that paper that allowed us to take the benefit earlier,
has also meant an in-year underspend in 2025/2026. 
The plan to manage the loss of savings in the later years means that the £4.388
million underspend requires to be transferred to reserves to be utilised across
those years.  This is a proposed Transfer to Reserves.  
40

Page 41

b. Pay Award: A one-off underspend of £3.987 million is anticipated in relation to
Pay Award funding in 2026/2027.  This reflects the level of funding provided to
the council, and Teachers pay award being implemented in line with the school
year rather than 1 April.  This budget is required for Pay Award costs across
2026/2027 and 20027/2028 but realises a one-off benefit this financial year. 
It is proposed that the £3.987 million underspend be transferred to reserves to
support the Council’s Medium-Term Budget Gap.  This was included in the
figures presented to Executive Committee on 5 November which illustrated how
one-off funding can be utilised over the longer term in the Council’s Budget
Strategy. 
c. Packaging Extended Producer Responsibility (PEPR) staffing: £0.610 million
of the 2025/2026 funding was set aside to meet the costs of the dedicated team
within Community and Enterprise for a 2-year period.  In line with recruitment
timescales, spend of £0.545 million in staffing costs will be required in future
years. 
It is proposed that £0.545 million be transferred to reserves to be utilised towards
staffing costs in future years. 
d. Procurement Savings: An underspend of £0.626 million is anticipated in relation
to procurement savings proposed for 2026/2027 that have already been achieved
this financial year.  These have been achieved through a focus on demand
management opportunities (buying less or not at all), alternative product
specifications and new routes to market. 
e. Strathclyde Regional Council (Liabilities): An overspend £0.200 million is
forecast in relation to a commitment for SRC liabilities for 2025/2026.  As these
costs relate to liabilities which pre-date the Council and cannot be covered by the
Insurance policies held by the Council, then they are not funded from the
Council’s Insurance Fund.  We are funding these costs on an annual basis when
they are confirmed as there is no certainty around either the amount or timing of
potential liabilities. 
f. Central Energy Efficiency Fund / Renewable Heat Incentive (RHI) and Feed
In Tariff (FIT) Income: Resources are allocated funding from the Central Energy
Efficiency Fund (CEEF) Reserve to pay for spend to save projects.  When the
savings are generated from the project in future years, they repay the initial costs
to the CEEF Reserve.  This over recovery of income (£0.297 million) represents
the repayment to be transferred to the CEEF Reserve in 2025/2026.  In addition,
Renewable Heat Incentive (RHI) and Feed In Tariff (FIT) income has been
received in-year (£0.200 million).  The over recoveries of income are included in
the proposed transfers to reserves in Appendix 2. 
5.14. Table 3 illustrates the Corporate Items position before and after transfers to
reserves.  
41

Page 42

Table 3: Summary of Corporate Items 
Outturn
Before
Transfers
to
Reserves
£m
Proposed
Transfers
to
Reserves 
£m
Outturn
After
Transfers
to
Reserves
£m
Service Concessions (section 5.13, a) 4.388 4.388 0.000
Pay Award (section 5.13, b) 3.987 3.987 0.000
PEPR Staffing (section 5.13, c) 0.545 0.545 0.000
Procurement Savings (section 5.13, d) 0.626 0.000 0.626
SRC Liabilities (section 5.13, e) (0.200) 0.000 (0.200)
CEEF / RHI / FIT Income (section 5.13, f) 0.497 0.497 0.000
Other Minor Items (0.004) 0.000 (0.004)
Total Corporate Items  9.839 9.417 0.422 
5.15. The net Corporate Items underspend after Transfers to Reserves is £0.422 million
and is mainly attributable to procurement savings for 2026/2027 achieved in
2025/2026 (£0.626 million) partially offset by £0.200 million estimated cost of SRC
Intromissions in 2025/2026. 
5.16. Council Tax including Council Tax Reduction Scheme (CTRS):  An over
recovery of £0.330 million is anticipated in 2025/2026. This is mainly due to higher
than anticipated income from additional in year properties (£0.446 million) partially
offset by an overspend on Council Tax Reduction Scheme (£0.116 million). £0.200
million of this income relates to income from Second Homes which should be
transferred to the HRA in line with the approved Council Tax Second Homes Policy
(100% Surcharge).  This is included in the proposed Transfers to Reserves in
Appendix 2. 
5.17.  Summary of Overall Outturn Position
Taking into account the position across the Budget areas as detailed in sections 5.1
to 5.16, the outturn position is an underspend of £3.579 million.   
5.18. In terms of this £3.579 million, the following was agreed at the Executive
Committee on 4 February 2026:- 
• that £1.000 million of the underspend be transferred to reserves to allow the
Council to provide financial support to contribute towards the response to
questions posed by the Marmot initiative.  This £1.000 million will allow the
Council to contribute towards the cost of taking forwards activity to progress
Marmot findings including any required staffing and implementation costs
(Marmot Place for South Lanarkshire).
• that £0.040 million of the underspend be set aside to support the continuation of
the Winter Wishes programme within Children and Families in 2026/2027.
• that £0.100 million of the underspend be transferred to reserves for Commercial
Feasibility costs. 
• that £0.400 million of the underspend be set aside to support the findings of the
Third Sector Review to contribute to the external medium grants allocation
available for the next two years beyond 2026/2027.
• that £0.300 million be allocated to Heat Network / Decarbonisation projects.
• that the remaining £1.739 million underspend be transferred to reserves for
budget considerations in future years.  
42

Page 43

5.19. The full Probable Outturn is summarised in Table 5.   
Table 5: Summary of Overall Outturn Position  
£m
Position before Transfers: 
Resources Underspend (sections 5.1 – section 5.9) 7.290
Loan Charges Underspend (section 5.10 – 5.12) 2.459
Corporate Items Underspend (section 5.13 – section 5.15) 9.839
Council Tax / CTRS Net Over Recovery (section 5.16) 0.330
Forecast Underspend Before Transfers to Reserves  19.918
Less: 
Proposed Transfers to Reserves (Appendix 2)  (16.339)
Forecast Underspend AFTER Transfers to Reserves 3.579
Less: 
Additional Proposed Transfers to Reserves (sections 5.18 and Appendix 2)  (3.579)
Break-Even Position AFTER Transfers to Reserves - 
6. Housing Revenue Account Position
6.1. Appendix 4 also shows the forecast position for the financial year.  The Appendix
shows a break-even position for the Housing Revenue Account. 
6.2. This breakeven position includes a higher than budgeted Transfer from Reserves
(£0.287 million greater than budgeted).  The detail is shown in Appendix 4 with
variance explanations across subjective categories and includes spend on the new
Housing Management system introduced this year. 
7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. As detailed in sections 4 to 6 of the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
10.2. There are no implications for sustainability in terms of the information contained in
this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.  
43

Page 44

11.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
4 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 4 February 2026 
List of Background Papers
 Financial Ledger and budget monitoring results to 29 December 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
44

Page 45

Note:  While the Year to Date Actual at period 10 presents a net surplus position (£69.660m), this is timing only.  The forecast outturn
before transfers to reserves shows an underspend of £19.918 million.
Appendix 1
Before Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 130.856 129.390 1.466 1.12% 85.998
Facilities Waste and Grounds 79.236 78.368 0.868 1.10% 50.685
Leisure and Culture 20.090 20.126 (0.036) (0.18%) 17.649
Planning and Regulatory Services 5.223 4.315 0.908 17.38% 2.710
Enterprise and Sustainable Development 6.556 6.693 (0.137) (2.09%) 5.067
Roads, Transportation and Fleet 19.751 19.888 (0.137) (0.69%) 9.887
Education Resources 502.488 502.010 0.478 0.10% 373.110
Education 502.488 502.010 0.478 0.10% 373.110
Finance and Corporate Resources 44.025 43.147 0.878 1.99% 42.308
Finance Services - Strategy 2.311 2.344 (0.032) (1.38%) 2.772
Finance Services - Transactions 18.560 17.705 0.854 4.60% 15.201
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.349
Information Technology Services 8.512 8.614 (0.102) (1.20%) 11.953
Communications and Strategy Services 2.530 2.296 0.234 9.25% 2.055
Administration and Licensing Services 4.949 4.928 0.021 0.42% 4.346
Personnel Services 6.800 6.915 (0.115) (1.69%) 5.632
Housing & Technical Resources 18.973 18.850 0.123 0.65% 10.867
Housing Services 8.246 8.063 0.183 2.22% 7.597
Property Services 10.727 10.787 (0.060) (0.56%) 3.270
Social Work Resources 252.068 247.723 4.345 1.72% 183.816
Performance and Support Services 6.187 5.899 0.288 4.65% 4.134
Children and Families 52.841 50.736 2.105 3.98% 37.585
Adults and Older People 192.159 190.909 1.250 0.65% 141.826
Justice and Substance Misuse 0.881 0.179 0.702 79.68% 0.271
Joint Boards 1.629 1.629 0.000 0.00% 1.253
950.039 942.749 7.290 0.77% 697.352
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 950.039 942.749 7.290 0.77% 697.352
CFCR 2.299 2.299 0.000 0.00% 0.000
Loan Charges 37.249 34.790 2.459 6.60% 0.000
Corporate Items (0.965) (10.804) 9.839 (1019.59%) 0.461
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
Teacher Numbers - T/f to Reserves 4.200 4.200 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Waste and Recycling Services - T/f to Reserves 2.200 2.200 0.000 0.00% 0.000
Budget Strategy - T/f to Reserves 4.500 4.500 0.000 0.00% 0.000
Total Expenditure 1,026.730 1,007.142 19.588 1.91% 697.813
Council Tax 196.599 196.929 0.330 0.17% 151.484
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (19.058)
171.823 172.153 0.330 0.19% 132.426
General Revenue Grant 454.451 454.451 0.000 0.00% 349.578
Non Domestic Rates 371.110 371.110 0.000 0.00% 285.469
Transfer from Reserves 29.346 29.346 0.000 0.00% 0.000
Total Income 1,026.730 1,027.060 0.330 0.03% 767.473
Net Expenditure 0.000 (19.918) 19.918 0.00% (69.660)
Period Ended 29 December 2025 (No.10)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
45

Page 46

Appendix 2
Proposed Transfers to Reserves included in the Probable Outturn 
Purpose / Description Resource  Value
£m
Resources  
Strategic Waste Fund
Due to timing of spend on Waste projects, funding is required to be carried forward to in the Strategic Waste
Fund to support future spend on Waste. 
Community
and Enterprise
0.150
Air Condition for Refuse Collection Vehicles
Due to timing of expenditure on the retro fitting of air condition units within older refuse collection vehicles,
funding is required to be carried forward to next financial year.
Community
and Enterprise
0.080
Operational IT handheld devices
Due to the timing of procurement of handheld devices for Grounds and Streets staff in line with IT
development upgrades, funding is required to be carried forward to next financial year.
Community
and Enterprise
0.100
Front Line First
Funding received as part of 2025/2026 Investment funding is required to be carried forward to reflect the
profile of spend this year and within the overall three-year delivery programme.  
Community
and Enterprise
0.438
Local Plan
Annual contribution for future years costs associated with 2026/2027 Local Plan.
Community
and Enterprise
0.100
Local Growth Fund Transition
Through utilising external funding received in-year, an underspend in core Council funding will be carried
forward to maintain service levels into 2026/2027.
Community
and Enterprise
0.200
Fleet Sinking Fund 
Annual contribution to the Fleet sinking fund to maintain the asset replacement programme.
Community
and Enterprise
0.050
Total Community and Enterprise Resources   1.118
PEF
The funding received from the Government can be used up to the end of the school term (June 2026). The
underspend reflects the element of the funding that will be utilised in April to June 2026.
Education 0.400
Additional Support for Learning
Sourcing and purchasing Additional Support for Learning equipment for schools that will be utilised in April
to June 2026.
Education 0.078
Total Education Resources   0.478
Insurance Fund
A contribution to manage the anticipated increase in insurance premiums paid from the Fund.
Finance and
Corporate
0.300
Total Finance and Corporate Resources   0.300
First Stop Temporary Accommodation
The use of the in-year underspend to be set aside for the First Stop Accommodation project as planned
(Executive Committee, November 2025).
Housing and
Technical
0.123
Total Housing and Technical Resources  0.123
Children and Families Pressures
The transfer of one-off funding from the IJB due to reduced pension contributions has realised an
underspend which will be carried forward to support the pressures in Children and Families until the Budget
Recovery Plan is fully achieved.
Social Work 3.095
Transformational Residential Care
An in-year underspend is proposed as a contribution to transformational residential care in future years.
Social Work 0.500
The Promise
An in-year underspend in the IJB is proposed as a contribution to The Promise, to further augment the
support for young people transitioning from Children and Family Services to Adult Services over the
following two years.
Social Work 0.750
Total Social Work Resources  4.345
Total Resource Proposed Transfers to Reserves  6.364
Loans Charges  
Loans Charges
Funding to be utilised in future years in line with borrowing for service concession arrangements.  This will
be required to be drawn down from 2027/2028 (as approved at South Lanarkshire Council, January 2023).
Loans Charges 0.358
Total Loans Charges Proposed Transfer to Reserves  0.358
Corporate Items  
Service Concessions
Underspend arising due to a change in interest rates and indexation since the initial calculations were
undertaken, has meant that the estimated savings previously anticipated in 2028/2029 are available earlier.
Corporate
Items
4.388
Pay Award
Underspend carried forward from 2025/2026 as a result of Teachers pay award being implemented in line
with the school year.
Corporate
Items
3.987
Packaging Extended Producer Responsibility (PEPR) Staffing
Profiling of spend on waste project staffing costs in future years.
Corporate
Items
0.545
Central Energy Efficiency Fund (CEEF)
Resources are allocated funding from the CEEF Reserve to pay for spend to save projects which they repay
over future years from the revenue savings generated by the project. This transfer represents the payback
of savings from Resources and allows the Reserve to be regenerated for use on future projects.
Corporate
Items
0.297
Renewable Head Incentive (RHI) and Feed In Tariff (FIT)
Income from RHI and FIT is received in-year and will be set aside for funding future capital spend. 
0.200
Total Corporate Items Proposed Transfers to Reserves   9.417
Council Tax  
Council Tax Second Homes Policy (100% Surcharge)
Income of £0.200m should be transferred to the Housing Revenue Account in line with the Council’s second
homes policy.
HRA 0.200
Total Council Tax Proposed Transfers to Reserves  0.200
Total Proposed Transfers  16.339  
46

Page 47

Previously Approved Transfers to Reserves  
Loans Fund Review
(An underspend of £13.349 million is anticipated in the Loans Fund Budget in 2025/2026.  This budget
underspend of £13.349 million will be set aside and used against the Budget Gap in 2027/2028 as planned
(detailed in the Executive Committee report, June 2025).
Loans Fund (T/f
to Reserves)
13.349
Investments 
The total budget line 2025/2026 Investments – Transfers to Reserves is £13.859 million (£10.263 million
one-off Revenue investments not required this year and the underspend in Loan Charges of £3.596
million).  It is proposed that these two amounts (£10.263 million and £3.596 million) be transferred to
Reserves at the end of the year (detailed in the Executive Committee report, June 2025).
Investments (T/f
to Reserves)
13.859
Teachers Numbers
As there is no longer a need to restore teacher numbers to the higher level, this budget line can be
transferred to reserves.  Given the budget pressures resulting from the higher than budgeted pay award, it is
recommended that consideration be given to using the £4.2 million to support the Budget Strategy – with a
view to setting this aside for Pay Award (detailed in the Executive Committee report, August 2025
Teachers
Numbers (T/f to
Reserves)
4.200
Waste and Recycling Services
The November Executive Committee agreed that £2.5 million of core monies released by pEPR funding will
be retained within Community and Enterprise Resources and utilised towards one-off investment in waste
and recycling services.  It is anticipated that £0.3 million will be spent by the end of 2025/2026.  As a result,
£2.2 million has been transferred to earmarked reserves for use in future years (detailed in the Executive
Committee report, December 2025).
Waste (T/f to
Reserves)
2.200
Budget Strategy
The November Executive Committee agreed that £4.5 million of core monies released by pEPR funding will
be used to support the Council’s Budget Gap.  This will be transferred to earmarked reserves for use in
future years (detailed in the Executive Committee report, December 2025).
Budget Strategy
(T/f to
Reserves)
4.500
Total Approved Transfers to Reserves  38.108 
Additional Transfers to Reserves – Use of Outturn Underspend  
Marmot Initiative 
Use of £1.000 million underspend to allow the Council to provide financial support to contribute towards the
response to questions posed by the Marmot initiative.
Use of Outturn
Underspend
1.000
Winter Wishes 
Use of £0.040 million underspend to support the continuation of the Winter Wishes programme within
Children and Families in 2026/2027.
Use of Outturn
Underspend
0.040
Commercial Feasibility 
Use of £0.100 million underspend for Commercial Feasibility costs.
Use of Outturn
Underspend
0.100
Third Sector 
Use of £0.400 million underspend to support the findings of the Third Sector to contribute to the external
medium grants allocation available for the next two years beyond 2026/2027.
Use of Outturn
Underspend
0.400
Budget Strategy
Use of £2.039 million underspend for budget considerations in future years.
Use of Outturn
Underspend
2.039
Total Additional Transfers to Reserves – Use of Outturn Underspend  3.579 
47

Page 48

Note:  While the Year to Date Actual at period 10 presents a net surplus position (£69.660m), this is timing only.  The forecast outturn
after transfers to reserves shows an underspend of £3.579 million.
Appendix 3
After Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 130.856 130.508 0.348 0.27% 85.998
Facilities Waste and Grounds 79.236 79.136 0.100 0.13% 50.685
Leisure and Culture 20.090 20.126 (0.036) (0.18%) 17.649
Planning and Regulatory Services 5.223 4.455 0.768 14.70% 2.710
Enterprise and Sustainable Development 6.556 6.853 (0.297) (4.53%) 5.067
Roads, Transportation and Fleet 19.751 19.938 (0.187) (0.95%) 9.887
Education Resources 502.488 502.488 0.000 0.00% 373.110
Education 502.488 502.488 0.000 0.00% 373.110
Finance and Corporate Resources 44.025 43.447 0.578 1.31% 42.308
Finance Services - Strategy 2.311 2.343 (0.032) (1.38%) 2.772
Finance Services - Transactions 18.560 18.006 0.554 2.98% 15.201
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.349
Information Technology Services 8.512 8.614 (0.102) (1.20%) 11.953
Communications and Strategy Services 2.530 2.296 0.234 9.25% 2.055
Administration and Licensing Services 4.949 4.928 0.021 0.42% 4.346
Personnel Services 6.800 6.915 (0.115) (1.69%) 5.632
Housing & Technical Resources 18.973 18.973 0.000 0.00% 10.867
Housing Services 8.246 8.186 0.060 0.73% 7.597
Property Services 10.727 10.787 (0.060) (0.56%) 3.270
Social Work Resources 252.068 252.068 0.000 0.00% 183.816
Performance and Support Services 6.187 5.899 0.288 4.65% 4.134
Children and Families 52.841 53.831 (0.990) (1.87%) 37.585
Adults and Older People 192.159 192.159 0.000 0.00% 141.826
Justice and Substance Misuse 0.881 0.179 0.702 79.68% 0.271
Joint Boards 1.629 1.629 0.000 0.00% 1.253
950.039 949.113 0.926 0.10% 697.352
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 950.039 949.113 0.926 0.10% 697.352
CFCR 2.299 2.299 0.000 0.00% 0.000
Loan Charges 37.249 35.148 2.101 5.64% 0.000
Corporate Items (0.965) (1.387) 0.422 (43.73%) 0.461
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
Teacher Numbers - T/f to Reserves 4.200 4.200 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Waste and Recycling Services - T/f to Reserves 2.200 2.200 0.000 0.00% 0.000
Budget Strategy - T/f to Reserves 4.500 4.500 0.000 0.00% 0.000
Total Expenditure 1,026.730 1,023.281 3.449 0.34% 697.813
Council Tax 196.599 196.729 0.130 0.07% 151.484
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (19.058)
171.823 171.953 0.130 0.08% 132.426
General Revenue Grant 454.451 454.451 0.000 0.00% 349.578
Non Domestic Rates 371.110 371.110 0.000 0.00% 285.469
Transfer from Reserves 29.346 29.346 0.000 0.00% 0.000
Total Income 1,026.730 1,026.860 0.130 0.01% 767.473
Net Expenditure 0.000 (3.579) 3.579 0.00% (69.660)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 29 December 2025 (No.10)
48

Page 49

Variance Explanations
1. Employee Costs
The underspend in employee costs is due to vacancies within the service that continue to be actively recruited. 
2. Property Costs
The forecast underspend is due to the net effect of underspends in void rent loss and ground maintenance charges partially offset by
greater than budgeted contract cleaning. 
3. Payment to Other Bodies
Payments to Other Bodies are overspent due to spend on IT systems this financial year. 
4. Income
Income is under recovered mainly due to lower than budgeted income from laundry. 
49

Page 50

50

Page 51

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 12 February 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget 2025/2026 - Detailed Resource
Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2025/2026
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the 2025/2026 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted. 
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 29 December 2025.  The detailed papers cover
the General Services and also the Housing Revenue Account. 
3.2. The following information is provided for each Resource and the Housing Revenue
Account:- 
 an Executive Summary showing the top-level position
 details of the most significant variances across Subjective headings and across
Services
 a line-by-line trend analysis of the total Resource expenditure and income across
Subjective headings 
3.3. These are shown in Appendices A to F attached. 
4. Employee Implications
4.1. None 
5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report.
5
51

Page 52

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources. The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
26 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Revenue Ledger prints to 29 December 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk 
52

Page 53

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 29 December 2025 (No.10)
Community and Enterprise Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Facilities, Waste and Grounds 79.236 78.368 0.868 1.10% 50.685
Leisure and Culture 20.090 20.126 (0.036) (0.18%) 17.649
Planning and Regulatory Services 5.223 4.315 0.908 17.38% 2.710
Enterprise and Sustainable Devlopment 6.556 6.693 (0.137) (2.09%) 5.067
Roads, Transportation and Fleet 19.751 19.888 (0.137) (0.69%) 9.887
Total Community and Enterprise Resources 130.856 129.390 1.466 1.12% 85.998
5
53

Page 54

Community and Enterprise Resources Variance Analysis 2025/26 (Period 10) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 5,358k
under
APT&C Basic/ Superannuation/
National Insurance - 6,545k under 
Facilities, Waste and
Grounds Services -
4,979k under
The variances are mainly due to
vacant posts with recruitment
currently being progressed.    
Planning and
Regulatory Services -
340k under 
Enterprise and
Sustainable
Development - 295k
under 
Roads, Transportation
and Fleet Services -
960k under    
Overtime - (1,172) over Facilities, Waste and
Grounds Services -
(1,152k) over 
The projected overtime
overspend within Waste reflects
the distribution of new
food/garden bins in the
Clydesdale area and the
covering of vacant posts within
the service. The projected
overtime overspend within
Facilities, Grounds and Streets
is due to vacancies within the
services. It is anticipated that
costs will be offset against basic
pay (above).
54

Page 55

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.)  
Roads, Transportation
and Fleet Services -
(38k) over 
The projected overtime
overspend within Fleet is due to
vacancies within the services.
This is partially offset by an
underspend on overtime within
Roads. 
Pension Increases - (46k) over Facilities, Waste and
Grounds Services -
(14k) over 
The forecast overspend relates
to the ongoing cost of early
retirals. 
Planning and
Regulatory Services -
(74k) over 
Enterprise and
Sustainable
Development - 13k
under 
Roads, Transportation
and Fleet Services -
29k under
The forecast overspend relates
to the ongoing cost of early
retirals. 
The forecast underspend
relates to a reduction in the cost
of early retirals. 
The forecast underspend
relates to a reduction in the cost
of early retirals. 
Property Costs (1,120k)
over
Repairs and Maintenance Internal -
(463k) over 
Facilities, Waste and
Grounds Services -
(31k) over 
Roads, Transportation
and Fleet Services -
(112k) over 
The overspend is mainly due to
repair work undertaken at
Forrest Street. 
The overspend is mainly due to
anticipated repairs costs for
Roads depots being higher than
budget. 
55

Page 56

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.)  
Enterprise and
Sustainable
Development - (320k)
over
The anticipated overspend is
due to costs in excess of
provision for Hamilton Towers
dilapidations. 
Repairs and Maintenance External -
(36k) over 
Facilities, Waste and
Grounds Services -
(10k) over 
Planning and
Regulatory Services -
11k under 
Enterprise and
Sustainable
Development - (22k)
over 
Roads, Transportation
and Fleet Services -
(15k) over 
The overspend is mainly due to
repair work undertaken at
Forrest Street. 
The forecast is predicting less
spend on repairs and
maintenance costs within
Planning. 
The anticipated overspend is
due to costs in excess of
provision for Hamilton Towers
dilapidations. 
The overspend is mainly due to
anticipated repairs costs for
Roads depots being higher than
budget. 
Electricity Contract - 193k under Facilities, Waste and
Grounds Services -
172k under 
Enterprise and
Sustainable
Development - 21k
under
The predicted underspend is
within Amenity Services and is
due to costs being less than
budget. 
The predicted underspend is
within Economic Development
and is due to costs being less
than budget.
56

Page 57

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Gas - 30k under Facilities, Waste and
Grounds Services - 31k
under 
The predicted underspend is
within Amenity Services and is
due to costs being less than
budget. 
Cleaning & Janitorial Supplies and
Equipment - (316k) over
Facilities, Waste and
Grounds Services -
(319k) over 
The projected overspend
relates to an increase in costs
for cleaning materials within
Facilities Management. 
Health & Hygiene - (94k) over Facilities, Waste and
Grounds Services -
(94k) over 
The projected overspend is
within FACS and relates to the
purchase of healthy & hygiene
materials. 
Refuse Uplift - (95k) over Facilities, Waste and
Grounds Services -
(95k) over 
The projected overspend
relates to greater than budgeted
costs for Refuse Uplifts within
Facilities Management. 
Other Property Costs - (303k) over Facilities, Waste and
Grounds Services -
(254k) over 
Enterprise and
Sustainable
Development - (65k)
over 
The overspend relates to costs
for enabling works being carried
out at Forrest Street. 
The overspend mainly relates to
costs for the upgrade of the 8th
floor Council Offices in respect
of Amenity Staff transfer.
57

Page 58

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services
(3,022k)
over
Computer Equipment Purchase -
(246k) over
Facilities, Waste and
Grounds Services -
(23k) over 
Planning and
Regulatory Services -
(38k) over 
The overspend is within
Facilities and relates to
additional laptops required by
the service. 
This projected overspend
mainly relates to the greater
than budgeted costs on the IT
system upgrade for IDOX within
Planning & Building Standards. 
Roads, Transportation
and Fleet Services -
(180k) over
This projected overspend
mainly relates to increased
costs for annual subscriptions
for Computer Licenses within
Roads. 
Equipment, Apparatus & Tools -
(347k) over
Facilities, Waste and
Grounds Services -
(326k) over 
Roads, Transportation
and Fleet Services -
(22k) over
The projected overspend
relates to costs for catering and
cleaning equipment within
Facilities Management. 
The overspend is for equipment
costs associated with the
workshop. 
Materials - (2,036k) over Roads, Transportation
and Fleet Services -
(2,053k) over 
The overspend is within Roads
and relates to a greater spend
on materials due to increased
levels of work on roads
maintenance. 
58

Page 59

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
Food Purchases - (223k) over Facilities, Waste and
Grounds Services -
(223k) over
The overspend within Facilities
relates to rising costs in food.  
Protective Clothing - (151k) over  Facilities, Waste and
Grounds Services -
(141k) over 
The overspend is within
Facilities, Grounds and Waste
and is for PPE required within
the Services.
Transport and
Plant
(1,856k)
over
Purchase of Vehicles - (730k) over Facilities, Waste and
Grounds Services -
(721k) over 
The forecast overspend relates
to vehicles due to be purchased
within Grounds.  
Fleet Services - Drivers - (42k) over Roads, Transportation
and Fleet - (42k) over
The forecast overspend is due
to an increased charge from
Fleet to cover Road's PSA
service.  
Fleet Services - Fuel - (522k) over  Facilities, Waste and
Grounds Services -
(26k) over
The overspend is within
Grounds and relates to EV
charging costs. 
59

Page 60

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.)  
Roads, Transportation
and Fleet - (497k) over
The projected overspend is due
to fuel costs being higher than
budgeted. This is offset by an
over recovery in income. 
Fleet Services Return Conditions -
39k under
Facilities, Waste and
Grounds Services - 8k
under 
Roads, Transportation
and Fleet - 33k under 
The underspend is due to a
reduction in the number of
vehicles being returned during
the year. 
The underspend is due to a
reduction in the number of Fleet
vehicles being returned to the
hire company requiring repair
during the year.   
Pool Car Rental - (7k) over  Facilities, Waste and
Grounds Services - 8k
under 
Planning and
Regulatory Services -
(17k) over 
The underspend is due to less
demand for Pool Cars within
Waste. 
This projected overspend is due
to a greater demand than the
budget set for the hire of Pool
Cars within Planning.  
Pool Car Fuel - 19k under Planning and
Regulatory Services -
19k under 
The projected underspend is
due to Pool Cars now being
mostly electric.
60

Page 61

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.) 
Other Transport Costs - 27k under Roads, Transportation
and Fleet - 26k under 
The underspend is in the main
due to costs for telematics
being less than budget.  
Licences - (108k) over Roads, Transportation
and Fleet - (108k) over 
The overspend is due to costs
for licences and MOT
certificates being higher than
budget, this is offset by an over
recovery in income. 
Fleet Services Repairs - Outside
Repairs - (350k) over
Roads, Transportation
and Fleet - (350k) over
The projected overspend is
mainly due to higher than
anticipated expenditure on
outside repairs within Fleet
Services. This is partially offset
by income for rechargeable
works. 
Fleet Services Repairs - Materials -
(256k) over
Roads, Transportation
and Fleet - (256k) over
The projected overspend is due
to higher than budgeted costs
for materials and spares within
Fleet Services.  
Fleet Services Repairs - Tyres -
(225k) over
Roads, Transportation
and Fleet - (225k) over
The projected overspend is due
to higher than budgeted costs
for tyres.
61

Page 62

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.) 
Vehicle Maintenance - (517k) over Facilities, Waste and
Grounds Services -
(301k) over 
This projected overspend is due
to higher than budgeted
charges for routine
maintenance within Grounds
and Waste.   
Roads, Transportation
and Fleet - (218k) over
This projected overspend is due
to higher than budgeted
charges for routine
maintenance within Fleet and
Roads. 
Vehicle Asset Modification - (145k)
over
Facilities, Waste and
Grounds Services -
(174k) over 
The projected overspend mainly
relates to the installation of air
conditioning into Refuse
collection vehicles, in respect of
health and safety. 
Fleet Service Charges - Vehicle
Leasing - 201k under
Facilities, Waste and
Grounds Services -
164k under 
Roads, Transportation
and Fleet - 27k under
The underspend is within
Grounds and relates to the
number of vehicles currently on
lease being less than budget. 
This is offset by an overspend
on hire costs. 
This projected underspend
mainly relates to EV vehicles
that were previously on lease
now being on contract hire,
buses being returned by Fleet
Services and pool cars being
transferred to Social Work. 
62

Page 63

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.) 
Fleet Service Charges – Hired
Vehicles/ Contract Hires - 207k under
Facilities, Waste and
Grounds Services -
(194k) over 
Roads, Transportation
and Fleet - 402k under 
This projected overspend is due
to higher than budgeted
charges for external hires within
Grounds and Waste. 
The projected underspend is
mainly due to the lower level of
demand for hires for carrying
out road and lighting works. 
Fleet Service Charges - Road Fund
Licences - 48k under
Facilities, Waste and
Grounds Services - 32k
under 
Roads, Transportation
and Fleet - 15k under 
The projected underspend is
due to a decrease in RFL costs
for vehicles being replaced by
electric vehicles which incur a
lower charge. 
The projected underspend is
mainly within Fleet and is due to
a decrease in RFL costs for
vehicles being replaced by
electric vehicles which incur a
lower charge. 
Fleet Service Charges - Fuel - 474k
under
Facilities, Waste and
Grounds Services -
263k under 
The forecasted underspend is
in the main due to an increase
in the number of electric
vehicles within the service,
meaning less fuel is required,
this is offset by an overspend in
EV fuel costs above. 
63

Page 64

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.)
Roads, Transportation
and Fleet - 202k under 
The forecast underspend is
mainly due to less utilisation of
fleet vehicles and plant within
the Construction Unit.
Admin Costs (241k) over Printing & Stationery - (24k) over  Facilities, Waste and
Grounds Services -
(46k) over 
Enterprise &
Sustainable
Development - 13k
under 
The overspend is within
Facilities and relates to menu
development costs. 
The underspend is mainly
within Support, where there is a
reduction in requirement for
printing and stationery. 
Telephones - 39k under  Facilities, Waste and
Grounds Services - 15k
under 
Planning and
Regulatory Services -
11k under 
Enterprise &
Sustainable
Development - 15k
under 
The underspend within all
services is due to less
telephones being required in
the offices. 
Mobile Phones - (14k) over  Facilities, Waste and
Grounds Services -
(4k) over
The overspend is due to the
requirement for mobile phones
increasing, this is offset by an
64

Page 65

Subjective Head Variance  Subjective line Service / amount Explanation
Admin Costs
(cont.)   
Postages - (22k) over 
Membership Fees - (17k) over 
Medical Costs - (49k) over 
Enterprise &
Sustainable
Development - (10k)
over 
Planning and
Regulatory Services -
(12k) over 
Roads, Transportation
and Fleet - (8k) over 
Facilities, Waste and
Grounds Services -
(12k) over 
Facilities, Waste and
Grounds Services -
(40k) over 
Roads, Transportation
and Fleet - (10k) over 
underspend in telephones
within all services. 
The forecast anticipates a
greater demand on postal
services for notification of
Planning applications. 
The forecast anticipates a
greater demand on postal
services for notification of works
to residents. 
The overspend is within
Grounds and relates to
Standpipe Licence costs. 
The overspend reflects a higher
than anticipated level of medical
referrals due to staff absence
levels. 
65

Page 66

Subjective Head Variance  Subjective line Service / amount Explanation
Admin Costs
(cont.)
Legal Expenses - (33k) over 
Internet Agency Fees - (16k) over 
Training - (95k) over
Planning and
Regulatory Services -
(23k) over 
Facilities, Waste and
Grounds Services -
(16k) over 
Facilities, Waste and
Grounds Services -
(21k) over 
Roads, Transportation
and Fleet - (70k) over 
The forecast overspend mainly
relates to Reporter costs in
respect of the Local Plan. 
The overspend within Facilities
is in relation to payments made
for the Parent Pay system. 
The overspend relates to
greater than budgeted costs for
statutory training within the
services. 
The overspend relates to
greater than budgeted costs for
statutory training within the
Roads service. 
Payment to Other
Bodies 
(78k) over Payments to Other Bodies - (239k)
over 
Enterprise and
Sustainable
Development - (156k)
over 
Leisure - 20k under 
The anticipated overspend is
due to higher than budgeted
costs for Christmas switch on
events and payments made
through Employability in respect
of No One Left Behind and
Tackling child Poverty, the latter
two offset by income. 
The forecast underspend is due
to the annual Fireworks Display
at Strathclyde Park not being
held this year, due to ongoing
upgrades at Strathclyde Park. 
66

Page 67

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to Other
Bodies (cont.) 
Activities Programme - 167k under
Roads, Transportation
and Fleet - (115k) over 
Enterprise and
Sustainable
Development - 167k
under 
The forecast overspend is due
to charges greater than budget
from WoSLA, the weather
forecasts for Winter. 
The anticipated underspend is
due to lower than budgeted
costs through Employability in
respect of No One Left Behind
Training, which is offset by a
reduction of income. 
Payment to
Contractors 
(4,668k)
over
Payment to Trading Services -
(2,618k)
Enterprise and
Sustainable
Development - (40k)
over 
Roads, Transportation
and Fleet - (2,575k)
over 
The forecast overspend
includes for outstanding spend
on railings and doors in respect
of Rutherglen 900. 
The forecast overspend is
mainly due to higher than
budgeted costs for winter and
additional costs for reactive
maintenance of carriageways
and increased use of specialist
contractors within the
Construction Unit. 
Payment to Contractors - (2,052k)
over
Facilities, Waste and
Grounds Services -
(274k) over 
The projected overspend within
Streets relates to running costs
associated with the
crematorium and cemeteries
and overspend on the disposal
of general waste within the CA
Sites.
67

Page 68

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors (cont.)
Planning and
Regulatory Services -
(92k) over 
Leisure - (64k) over 
Enterprise and
Sustainable
Development - (20k)
over 
Roads, Transportation
and Fleet - (1,602k)
over 
The projected overspend
relates to the increased contract
rates for the kennelling of stray
dogs and house clearances
within Environmental Services. 
The projected overspend is due
to increased costs for works at
Cambuslang Library. 
The projected overspend
relates to a Feasibility study for
a running track at Larkhall. 
This projected overspend is
mainly the effect of an
increased spend on bridge
repairs and statutory
inspections within Structures,
along with increased contract
costs within the Traffic Section
on traffic lights.
Financing Charges  (19k) over I.T. Equipment Leasing Contract -
(19k) over
Facilities, Waste and
Grounds Services -
(7k) over 
The forecast overspend is due
to higher than budgeted costs
for IT leasing within Facilities
and Amenity. 
68

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Financing Charges
(cont.)
Enterprise and
Sustainable
Development - (£18k)
over 
Planning and
Regulatory Services -
10k under 
The forecast overspend is due
to higher than budgeted costs
for IT leasing within Support
Services. 
The forecast underspend is due
to lower than budgeted costs for
IT leasing within Environmental
Services. 
Income 7,112 over
recovered
Contributions from Other Bodies -
(52k) under recovered
Facilities, Waste and
Grounds Services -
130k over recovered 
Enterprise &
Sustainable
Development - (186k)
under recovered 
The predicted over recovery is
in the main due to rebates
received from Brakes within
Facilities. 
The predicted under recovery is
mainly within employability
where the reduction in income
reflects the underspends within
this service overall as is income
recovered through Business
Support. 
Sales - 998k over recovered  Facilities, Waste and
Grounds Services - 82k
over recovered 
The predicted over recovery is
due to income received from
vending machines and an over
recovery within Corporate
Catering. This is partially offset
by an under recovery in school
meal income. 
69

Page 70

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.) 
Fees and Charges - General - 17k
over recovered
Roads, Transportation
and Fleet - 916k over
recovered 
Facilities, Waste and
Grounds Services -
(364k) under recovered 
Planning and
Regulatory Services -
695k over recovered 
Roads, Transportation
and Fleet - (314k)
under recovered 
The over recovery mainly
relates to higher than
anticipated income from skip
permits, road closures and
Inspection fees within Roads
General. 
The projected under recovery is
due to lower than budgeted
income from care of gardens
within grounds services and
income received for burials
being less than budget within
streets services. These are
partially offset by a greater
demand for special uplifts within
Waste. 
The forecast over recovery is
mainly due to increased fees for
planning applications. 
The projected under recovery is
within parking where the
demand is less than anticipated
and less than budgeted income
recovered from EV recharging. 
70

Page 71

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges - Dept of the
Authority - 329k over recovered
Facilities, Waste and
Grounds Services -
219k over recovered 
Roads, Transportation
and Fleet - 100k over
recovered 
The projected over recovery is
due to an increase in additional
service requests to Waste
services from Housing and
Technical Resources for
additional bin uplifts as well as
an increase in income for Street
Cleansing. This is partially
offset by a loss of income within
Facilities due to the closure of
Red Deer. 
The over recovery within Fleet
is in the mainly due to income
received for EV electricity
usage. This partially offsets the
overspend in Transport & Plant.  
Fleet Services - 947k over recovered Roads, Transportation
and Fleet - 947k over
recovered 
The forecast over recovery is in
relation to income for fuel which
offsets the overspend within
Transport & Plant, as well as
over recoveries on vehicle
maintenance, RFL's, casual
and hire management fee. 
Other Income - 34k - over recovered Facilities, Waste and
Grounds Services -
(14k) under recovered 
The projected under recovery is
mainly within Grounds and
relates to grounds maintenance
work.  
71

Page 72

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Planning and
Regulatory Services -
12k over recovered 
The projected over recovery
relates to income received for
Homes for Multiple Occupancy
within Environmental.   
Enterprise &
Sustainable
Development - 155k
over recovered 
Roads, Transportation
and Fleet - (119k)
under recovered 
The projected over recovery is
mainly due to the provision for
the dilapidations of Hamilton
Towers within Property
Development. 
The projected under recovery is
due to income for leasing
management fee and pool cars
being less than budget. 
Trading Services Recharges - 4,779k
over recovered
Facilities, Waste and
Grounds Services -
339k under recovered 
Roads, Transportation
and Fleet - 5,118k over
recovered 
The under recovery is within
Grounds and relates to
Adoption Monies not being
drawn down. 
The over recovery is due to
employee recharges within
Fleet and income recovered
from Capital works within the
Roads Construction Unit.
* The underlined variances represent new variances since the last report. 
72

Page 73

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 0 0 1 (1) 0 0 0 1 1 (1)
APT & C BASIC 87,061 2,481 86,609 2,836 83,976 3,410 85,816 57,430 80,096 5,720
APT & C OVERTIME 1,978 (648) 2,319 (980) 2,553 (1,213) 1,301 1,711 2,473 (1,172)
APT & C SUPERANNUATION 5,812 82 5,583 347 5,483 286 5,683 3,592 4,926 757
APT & C NIC 10,095 80 9,933 220 9,698 274 9,867 6,986 9,799 68
MANUAL SESSIONAL STAFF BASIC 0 0 0 0 2,054 0 2,054 1,592 2,054 0
MANUAL SESSIONAL STAFF OVERTIME 0 0 0 0 0 0 0 38 0 0
MANUAL SESSIONAL STAFF SUPERANNUATION 0 0 0 0 161 0 161 66 161 0
MANUAL SESSIONAL STAFF NIC 0 0 0 0 181 0 181 175 181 0
TRAVEL AND SUBSISTENCE 103 1 104 0 104 0 109 52 70 39
OTHER EMPLOYEE COSTS 227 0 187 0 207 (20) 187 24 193 (6)
PENSION INCREASES 1,219 (105) 1,219 (105) 1,219 (105) 1,118 799 1,164 (46)
STRAIN ON THE FUND 0 0 0 0 0 0 0 2 2 (2)
COST LABOUR ALLOCATION (64) 0 (64) 0 (64) 0 (64) (65) (65) 1
EMPLOYEE COSTS 106,431 1,891 105,891 2,317 105,572 2,632 106,413 72,403 101,055 5,358
PROPERTY COSTS
RATES 1,147 (101) 1,147 (102) 1,201 (85) 1,116 1,118 1,120 (4)
SCOTTISH WATER - UNMETERED CHARGES 26 0 8 0 8 0 8 0 5 3
SCOTTISH WATER - METERED CHARGES 154 0 176 (2) 174 0 176 143 189 (13)
RENT 221 (20) 222 (21) 222 (21) 214 44 219 (5)
SERVICE CHARGE 42 0 42 0 42 0 42 29 51 (9)
FACTORING CHARGES 26 (10) 26 (10) 26 (10) 15 27 27 (12)
PROPERTY INSURANCE 288 0 288 0 288 0 308 268 301 7
SECURITY COSTS 44 0 55 (3) 55 (3) 52 6 36 16
GROUND MAINTENANCE 8 0 8 0 8 0 8 5 12 (4)
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 9 (9) 10 (10) 0 19 19 (19)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 60 (25) 61 (25) 76 (40) 36 88 499 (463)
LIFE CYCLE MAINTENANCE 0 0 0 0 0 0 0 2 0 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 17 13 253 13 255 11 373 343 409 (36)
ADAPTIONS - INTERNAL CONTRACTOR 0 0 0 0 0 0 0 1 0 0
GAS HEATING LEASE COSTS 0 0 0 0 0 0 0 1 1 (1)
ASBESTOS 0 0 0 0 0 0 0 1 0 0
ELECTRICITY - CONTRACT 4,733 0 4,737 0 4,737 0 4,737 2,656 4,544 193
ELECTRICITY - NON CONTRACT 0 0 0 0 0 0 0 3 2 (2)
GAS 1,178 0 1,182 (1) 1,182 0 1,182 1,101 1,152 30
HEATING OIL 14 0 14 0 14 0 14 (1) 2 12
CLEANING CONTRACT 20 0 20 0 20 0 20 20 24 (4)
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 733 (149) 735 (150) 739 (155) 715 616 1,031 (316)
HEALTH & HYGIENE MATERIALS 43 0 43 0 43 0 43 91 137 (94)
PEST CONTROL 0 0 0 0 0 0 0 10 0 0
REFUSE UPLIFT 405 0 505 (100) 505 (100) 405 541 500 (95)
REMOVAL & STORAGE COSTS 0 0 0 0 0 0 0 2 1 (1)
OTHER PROPERTY COSTS 30 0 30 0 30 (1) 35 47 338 (303)
OFFICE ACCOMODATION FACILITIES 4 0 4 0 4 0 4 4 4 0
PROPERTY COSTS 9,193 (292) 9,565 (410) 9,639 (414) 9,503 7,185 10,623 (1,120)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 686 (81) 688 (83) 688 (83) 672 459 918 (246)
COMPUTER EQUIPMENT RENTAL 6 0 6 0 6 0 6 0 8 (2)
COMPUTER EQUIPMENT MAINTENANCE 46 0 46 (1) 70 (24) 46 8 36 10
I.T. EQUIPMENT MAINT-CONTRACT 217 (1) 234 (17) 234 (16) 217 42 231 (14)
I.T. ELECTRONIC MESSAGING 3 0 3 0 3 0 3 0 1 2
EQUIPMENT, APPARATUS AND TOOLS 1,294 (140) 1,295 (140) 1,378 (222) 2,084 803 2,431 (347)
SMALL TOOLS 107 0 107 0 107 0 107 3 87 20
ADAPTATIONS FOR CLIENTS 0 0 0 0 0 0 0 21 16 (16)
FURNITURE - OFFICE 1 0 8 0 8 0 8 11 12 (4)
FURNISHINGS (INCL. CROCKERY & LINEN) 110 0 110 0 110 0 110 79 110 0
MATERIALS 7,142 (65) 7,181 (96) 7,534 (114) 7,585 4,247 9,621 (2,036)
STOCK/STORE ISSUES 0 0 0 0 0 0 0 1,651 0 0
MATERIALS, APPARATUS AND EQUIPMENT 10 0 12 0 12 0 12 5 7 5
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 27 (25) 27 (25) 27 (25) 2 0 1 1
PROVISIONS 0 0 0 0 0 0 0 4 3 (3)
FOOD PURCHASES 5,446 0 5,448 (1) 5,574 0 5,723 3,605 5,946 (223)
BEVERAGES 0 0 4 (4) 5 (5) 0 6 9 (9)
SCHOOL MILK 50 0 50 0 50 0 50 40 50 0
RECHARGES OF DIRECT FOOD COSTS 68 0 68 0 68 0 68 (8) 68 0
OPENING STOCK 0 0 0 0 0 0 0 2,136 0 0
CLOSING STOCK 0 0 0 0 0 0 0 (2,163) 0 0
PROTECTIVE CLOTHING & UNIFORMS 320 (85) 323 (85) 323 (85) 260 250 411 (151)
LAUNDRY COSTS 10 0 10 0 10 0 10 11 14 (4)
OTHER SUPPLIES AND SERVICES 868 0 888 (1) 889 (2) 586 108 573 13
MAJOR SUPPLY OF ELECTRICAL POWER 2,368 0 2,368 0 2,368 0 2,369 1,349 2,380 (11)
OUTSOURCED MAIL 0 0 4 (3) 5 (4) 1 11 8 (7)
DELIVERY CHARGE 1 0 1 0 1 0 1 1 1 0
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 (1) 0 0
SUPPLIES AND SERVICES 18,780 (397) 18,881 (456) 19,470 (580) 19,920 12,678 22,942 (3,022)
73

Page 74

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 0 0 0 (2,138) 730 (730)
PURCHASE OF PLANT 63 0 63 0 63 0 6 28 22 (16)
FLEET SERVICES - DRIVERS 106 (43) 107 (44) 108 (45) 65 107 107 (42)
FLEET SERVICES - FUEL 2,999 0 3,099 (100) 3,099 (100) 2,999 2,563 3,521 (522)
FLEET SERVICES - VEHICLE HIRE 1,229 0 1,229 0 1,229 0 1,229 1,014 1,190 39
POOL CAR CHARGES - RENTAL 75 (10) 81 (12) 85 (16) 104 58 111 (7)
POOL CAR CHARGES - FUEL 21 0 21 0 22 0 19 0 0 19
POOL CAR CHARGES - ADDITIONAL COSTS 7 0 6 0 6 0 6 5 5 1
OTHER TRANSPORT COSTS 78 0 78 0 78 0 73 22 46 27
TRANSPORT INSURANCE 93 0 92 0 93 0 93 93 93 0
LICENCES 491 0 491 0 491 0 491 368 599 (108)
FLEET SERVICES - REPAIRS 2,617 0 2,717 (100) 2,910 (265) 2,617 2,505 3,421 (804)
PLANT SERVICES 19 0 19 0 19 0 19 10 19 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,396 (70) 4,442 (160) 4,442 (160) 4,405 3,622 4,922 (517)
FLEET SERVICE CHARGES - PLANT MAINTENANCE 269 0 269 0 269 0 361 207 358 3
FLEET SERVICE CHARGES - ASSET MODIFICATION 68 0 68 0 68 0 68 32 213 (145)
FLEET SERVICE CHARGES - LEASING 4,784 (1) 4,629 101 4,629 99 4,805 2,291 4,604 201
FLEET SERVICE CHARGES - HIRED VEHICLES 1,119 (30) 1,269 (60) 1,384 (175) 1,433 787 1,182 251
FLEET SERVICE CHARGES - CONTRACT HIRE 176 0 189 0 189 0 199 174 243 (44)
FLEET SERVICE CHARGES - ROAD FUND LICENCE 237 0 235 0 235 0 241 154 193 48
FLEET SERVICE CHARGES - FUEL 3,045 0 3,017 (2) 3,016 0 3,035 1,747 2,561 474
FLEET SERVICE CHARGES - DRIVERS 66 (8) 73 (15) 72 (14) 56 71 71 (15)
HIRE OF EXTERNAL VEHICLES 68 0 68 0 68 0 68 0 33 35
HIRE OF EXTERNAL PLANT 328 0 328 0 328 0 278 222 275 3
HIRE OF SKIPS 17 0 17 0 17 0 17 19 24 (7)
PUPIL TRANSPORT - SPECIAL EDUCATION 297 0 298 0 298 0 298 30 298 0
TRANSPORT AND PLANT 22,668 (162) 22,905 (392) 23,218 (676) 22,985 13,991 24,841 (1,856)
ADMINISTRATION
PRINTING AND STATIONERY 235 (31) 234 (32) 242 (31) 216 187 240 (24)
TELEPHONES 107 (1) 103 (1) 102 0 98 23 59 39
MOBILE PHONES 71 0 67 0 67 0 60 0 74 (14)
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 8 0 8 0 8 0 8 0
ADVERTISING - OTHER 75 0 75 0 81 0 94 68 104 (10)
POSTAGES/COURIERS 32 0 31 1 34 (2) 31 38 53 (22)
MEMBERSHIP FEES/SUBSCRIPTIONS 58 (9) 75 (24) 75 (23) 84 69 101 (17)
INSURANCE 260 0 260 0 260 0 260 262 261 (1)
MEDICAL COSTS 64 (59) 75 (69) 76 (69) 7 42 56 (49)
LEGAL EXPENSES 6 0 6 0 6 0 12 23 45 (33)
HOSPITALITY / CIVIC RECOGNITION 3 0 3 0 3 0 3 0 2 1
INTERNET AGENCY FEES 33 (10) 33 (10) 33 (10) 23 28 39 (16)
SECURITY UPLIFT FEES 26 0 17 0 17 0 17 14 18 (1)
OTHER ADMIN COSTS 4 0 4 0 4 0 4 2 3 1
MEMBERS ALLOWANCES 5 (5) 0 0 0 0 0 0 0 0
TRAINING 21 (15) 26 (15) 27 (16) 11 26 106 (95)
ADMINISTRATION 1,008 (130) 1,017 (150) 1,035 (151) 928 782 1,169 (241)
PAYMENT TO OTHER BODIES
SPTE: ANNUAL BUS SUBSIDY 2,041 0 2,041 0 2,041 0 2,034 692 2,034 0
SPTE: BUS OTHER 258 0 258 0 258 0 258 258 258 0
SPTE: FERRIES 29 0 29 0 29 0 29 29 29 0
SPTE: UNDERGROUND 1,318 0 1,318 0 1,318 0 1,318 1,318 1,318 0
SPTE: OTHER 1,727 0 1,727 0 1,727 0 1,727 1,727 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 0 131 0 131 0 131 98 131 0
YOUTH EMPLOYMENT TRAINING 0 0 0 0 0 0 0 (2) 0 0
OTHER LOCAL AUTHORITIES 73 0 73 0 73 0 73 72 81 (8)
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 22 0 22 0 22 0 20 2
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 39 0 39 0 39 0 39 0
PAYMENTS TO OTHER BODIES 9,308 (1) 10,023 (21) 10,753 (21) 11,009 5,420 11,248 (239)
EXTERNAL AUDIT FEES 3 0 3 0 3 0 3 4 3 0
ACTIVITIES PROGRAMME 634 0 439 0 439 0 439 220 272 167
PAYMENT TO OTHER BODIES 15,583 (1) 16,103 (21) 16,833 (21) 17,082 9,836 17,160 (78)
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 147 0 154 0 284 0 418 69 3,036 (2,618)
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 0 302 0 302 0 302 163 300 2
PAYMENT TO PRIVATE CONTRACTOR 38,851 (50) 38,851 (50) 39,432 (220) 39,241 31,726 41,293 (2,052)
PAYMENT TO INTERNAL CONSULTANT 30 0 30 0 121 0 119 0 119 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 0 0 0 50 56 50 0
PAYMENT TO CONTRACTORS 39,330 (50) 39,337 (50) 40,139 (220) 40,130 32,014 44,798 (4,668)
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 0 617 0 617 0 625 469 625 0
TRANSFER PAYMENTS 617 0 617 0 617 0 625 469 625 0
74

Page 75

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 212 (20) 211 (20) 211 (20) 191 32 210 (19)
FINANCING CHARGES 212 (20) 211 (20) 211 (20) 191 32 210 (19)
TOTAL EXPENDITURE 213,822 839 214,527 818 216,734 550 217,777 149,390 223,423 -5,646
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 0 (37) 0 (37) 0 (37) 0 (37) 0
CONTRIBUTIONS FROM OTHER BODIES (20,310) 0 (20,890) 0 (21,356) 0 (21,604) (9,364) (21,552) (52)
ERDF GRANT 0 0 0 0 0 0 0 (1,156) 0 0
ESF GRANT 0 0 0 0 0 0 0 1 0 0
SALES - GENERAL (4,678) 0 (4,538) (140) (5,338) (140) (5,477) (4,329) (6,475) 998
ELECTIONS - ACCOMMODATION USE 0 0 (11) 11 (11) 11 0 (11) (4) 4
SALES - DEPARTMENTS OF THE AUTHORITY (136) 0 (136) 0 (136) 0 (136) (124) (158) 22
FEES AND CHARGES - GENERAL (11,380) (726) (11,426) (681) (11,646) (461) (13,107) (10,476) (13,124) 17
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,067) 19 (7,066) 19 (7,074) 27 (7,048) (6,885) (7,377) 329
RENTAL INCOME (48) 0 (48) 0 (48) 0 (90) (95) (98) 8
FLEET SERVICES (12,508) (132) (12,608) (32) (12,680) 13 (12,639) (9,762) (13,586) 947
OTHER INCOME (3,162) 0 (2,976) 5 (2,821) 0 (2,554) (1,597) (2,588) 34
RECOVERY FROM CAPITAL (1,333) 0 (1,333) 0 (1,333) 0 (586) (407) (612) 26
RECHARGES - DEPARTMENTS OF THE AUTHORITY (23,719) 0 (23,719) 0 (23,719) 0 (23,643) (19,187) (28,422) 4,779
TOTAL INCOME (84,378) (839) (84,788) (818) (86,199) (550) (86,921) (63,392) (94,033) 7,112
NET EXPENDITURE 129,444 0 129,739 0 130,535 0 130,856 85,998 129,390 1,466
75

Page 76

76

Page 77

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 29 December 2025 (No.10)
Education Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Education 502.488 502.010 0.478 0.10% 373.110
Total Education Resources 502.488 502.010 0.478 0.10% 373.110
5
77

Page 78

Education Resources Variance Analysis 2025/26 (Period 10) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,664k under Teachers Basic / Superannuation /
National Insurance - (2,336k) over 
APT&C Basic / Superannuation /
National Insurance – 4,132k under 
Premature Retirals - (148k) over 
Schools - (2,327k) over 
Early Years / Support
Services – 4,131k
under 
Schools - (148k) over 
The projected overspend
relates to the increased use of
supply teachers for absence
cover. 
The projected underspend
mainly relates to Early Years
and Support Services posts and
is the result of staff turnover. 
The overspend relates to
increased monthly costs for
historic early retirals due to
inflation levels and the cost of
pensions. 
Supplies &
Services
(82k) over Aids for Clients - (77k) over 
Materials - (269k) over 
Schools - (77k) over 
Schools - (269k) over 
This overspend is due to the
increased demand and cost for
new equipment required by
children in school with complex
physical needs. 
The overspend is due to the
additional cost of per capita
expenditure reflecting the
growth in pupil numbers and
price increase. Contained within
this position is funding for ASL
that will be transferred to
reserves (£0.078m) to support
expenditure commitments to the
end of the school session in
June 2026. 
78

Page 79

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies &
Services (cont.) 
Pupil Equity Fund – 400k under 
Catering Contract – (126k) over 
Schools – 400k under 
Schools (126k) over
The underspend reflects the
profile of Pupil Equity Fund
(PEF) spend and commitment
across the academic year in
line with school improvement
plans and will therefore be
carried forward to 2026/2027, to
be used in the April to June
2026 school session. 
The overspend is due to an
increased cost for food for
breakfast clubs.
Transport and
Plant
(3,387k) over Fleet Services Charges – (101k) over 
Pupil Transport - ASN - (2,459k) over 
Pupil Transport - Strathclyde
Passenger Transport - (826k) over 
Schools – (101k) over 
Schools - (2,459k) over 
Schools - (826k) over 
This is a demand led service
and reflects the volume of
children requiring ASN transport
to school and increased costs. 
This is a demand led service
and reflects the volume of
children requiring ASN transport
to school and increased costs. 
This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs. 
79

Page 80

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs
(1k) over Telephones/Mobile Phones - (37k)
over 
Conferences - 51k under
Schools - (37k) over 
Early Years - 51k
under 
The overspend relates to higher
than anticipated telephone
costs in schools due to a
change in contract. 
The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated. 
Payments to Other
Bodies 
(933k) over  Other Local Authorities – (861k) over 
Payments to Other Bodies - 903k
under 
Independent Schools Places - (953k)
over
Schools – (861k) over 
Early Years - 903k
under 
Schools - (953k) over
The overspend is due to an
increase in the cost of external
school placements within other
local authorities and back dated
charges from another local
authority.   
This projected underspend is
due to less than anticipated
core Early Years spend
including cross boundary
charges to other Local
Authorities. 
This projected overspend
reflects the increased cost of
placements for pupils with
additional support needs in
Independent Schools and is
due to both an increase in the
number of places and the cost
of placements. 
80

Page 81

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors
360k under Payments to Private Contractors –
360k under
Non Schools – 360k
under
The projected underspend
relates to the timing of savings
associated with the renewal of
the insurance arrangements
within the contract this year. 
Transfer Payments 114k under Footwear and Clothing Grants - 114k
under 
Schools - 114k under  This projected underspend
reflects lower than anticipated
expenditure on footwear and
clothing grants during the
financial year, reflecting current
demand. 
Income 2,742k over
recovered
Fees and Charges - Other Local
Authorities - 745k over recovered 
Early Years Fees - 1,956k over
recovered 
Schools - 745k over
recovered 
Early Years - 1,956k
over recovered
This projected over recovery
reflects the increase in income
recovered from other Local
Authorities for children
attending schools in South
Lanarkshire. This income is
used to support the cost of
external placements. 
This projected over recovery in
Early Years’ fees relates to
increased uptake of available
nursery places beyond 1140
hours. 
81

Page 82

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 187,151 0 188,198 0 188,512 0 194,413 139,507 193,938 475
TEACHERS SUPERANNUATION 48,699 0 48,964 0 49,027 0 50,566 35,669 50,566 0
TEACHERS NI 24,659 0 24,767 0 24,794 0 25,494 18,807 25,494 0
FIXED TERM CONTRACT - TEACHER  - APT&C BASIC 3,028 (1,620) 3,321 (1,920) 3,829 (2,420) 1,508 1,772 4,319 (2,811)
FIXED TERM CONTRACT - TEACHER  SUPERANNUATION 0 0 0 0 0 0 0 231 0 0
SUPPLY TEACHERS - APT&C BASIC 0 0 0 0 0 0 0 664 0 0
SUPPLY TEACHERS - APT&C SUPERANNUATION 0 0 0 0 0 0 0 550 0 0
SUPPLY TEACHERS - APT&C NIC 0 0 0 0 0 0 0 85 0 0
APT&C BASIC 75,538 1,498 75,526 2,098 75,167 2,535 76,030 51,491 72,486 3,544
APT&C OVERTIME 5 0 6 0 6 0 20 347 20 0
APT&C SUPERANNUATION 5,359 64 5,352 109 5,333 137 5,368 3,339 5,164 204
APT&C NIC 7,820 121 7,791 200 7,745 257 7,895 6,064 7,511 384
TRAVEL AND SUBSISTANCE 208 0 208 0 207 0 236 115 203 33
PENSION INCREASES 434 0 434 0 434 0 434 302 441 (7)
PREMATURE RETIRALS 5,041 0 5,191 (150) 5,191 (150) 5,041 3,693 5,189 (148)
STRAIN ON THE FUND 0 0 0 0 0 0 0 6 10 (10)
TEACHERS TRAINING 0 0 0 0 0 0 (9) 1 (9) 0
CONSULTANTS 0 0 0 0 0 0 0 6 0 0
EMPLOYEE COSTS 357,942 63 359,758 337 360,245 359 366,996 262,649 365,332 1,664
PROPERTY COSTS
RATES 19,192 0 19,192 0 19,398 0 19,398 19,374 19,374 24
SCOTTISH AKATER - UNMETERED CHARGES 0 0 0 0 0 0 0 0 2 (2)
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,385 0 1,385 0 1,385 0 1,385 891 1,388 (3)
SCOTTISH WATER - METERED CHARGES 784 0 784 0 784 0 784 541 785 (1)
RENT 308 0 337 (29) 337 (29) 363 169 348 15
SERVICE CHARGE 58 0 58 0 58 0 58 69 58 0
PROPERTY INSURANCE 484 0 484 0 484 0 484 485 508 (24)
SECURITY COSTS 68 0 68 0 68 0 70 52 74 (4)GROUNDS MAINTENANCE ADDITIONAL AKORKS 0 0 0 0 0 0 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 55 0 60 0 60 0 56 27 56 0
LIFE CYCLE MAINTENANCE 0 0 0 0 2 0 2 2 2 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 16 0 29 0 29 0 37 37 37 0
ADAPTIONS - INTERNAL CONTRACTORS 55 0 78 0 121 0 102 64 102 0
ELECTRICITY  - CONTRACT 8,693 0 7,693 0 7,253 0 7,253 3,834 7,278 (25)
GAS 4,074 0 4,074 0 4,074 0 4,074 1,663 4,055 19
HEATING OIL 164 0 164 0 164 0 164 60 164 0
SOLID FUEL 171 0 171 0 171 0 171 154 171 0
FIXTURE & FITTINGS 0 0 0 0 1 0 2 2 2 0
JANITOR SERVICE 128 0 128 0 158 0 151 147 147 4
CLEANING CONTRACT 659 0 659 0 659 0 503 515 515 (12)
CLEANING OUTWITH CONTRACT 8 0 8 0 8 0 8 0 3 5
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 547 (195) 549 (195) 578 (145) 465 303 469 (4)
HEALTH & HYGIENE MATERIALS 76 0 76 0 76 0 52 9 52 0
AKINDOAK CLEANING 3 0 3 0 3 0 2 0 2 0
REFUSE UPLIFT 17 0 17 0 17 0 17 23 24 (7)
REMOVAL & STORAGE COSTS 0 0 0 0 1 0 1 1 1 0
OTHER PROPERTY COSTS 384 0 384 0 413 0 17 1 0 17
ACCOMMODATION RECHARGE TO USERS 882 0 882 0 882 0 882 882 882 0
PROPERTY COSTS 38,211 (195) 37,283 (224) 37,184 (174) 36,501 29,305 36,499 2
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 127 0 148 0 140 0 330 299 330 0
COMPUTER EQUIPMENT RENTAL 1 0 1 0 1 0 1 0 0 1
I.T. EQUIPMENT MAINT-CONTRACT 2,805 0 2,808 0 2,809 0 3,368 2,821 3,371 (3)
I.T. ELECTRONIC MESSAGING 0 0 3 0 8 0 21 12 21 0
EQUIPMENT, APPARATUS AND TOOLS 37 0 35 0 35 0 35 17 37 (2)
SMALL TOOLS 1 0 1 0 2 0 4 3 4 0
AIDS FOR CLIENTS 189 (72) 189 (72) 189 (72) 127 157 204 (77)
ADAPTATIONS FOR CLIENTS 16 0 27 0 27 0 54 41 54 0
SUPPLIES FOR CLIENTS 5 0 4 0 5 0 9 9 9 0
FURNITURE - OFFICE 6 0 8 0 7 0 14 14 14 0
FURNITURE - GENERAL 68 0 71 0 81 0 87 87 87 0
FURNISHINGS (INCL. CROCKERY & LINEN) 3 0 4 0 6 0 9 9 9 0
MATERIALS 26 0 30 0 32 0 35 35 35 0
MATERIALS, APPARATUS AND EQUIPMENT 1,996 (205) 2,079 (320) 1,792 (320) 2,796 1,382 3,065 (269)
PUPIL EQUITY FUNDING 6,999 0 4,738 0 4,117 0 2,984 0 2,584 400
SAC FUNDING 303 0 286 0 269 0 358 0 358 0
LIBRARY/RESOURCE CENTREMATERIALS 71 0 72 0 71 0 60 34 60 0
AUDIO VISUAL 6 0 6 0 6 0 8 8 8 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 11 0 15 0 18 0 27 27 27 0
TV LICENCES - EDUCATION 32 0 26 0 26 0 26 7 26 0
PROVISIONS 57 0 71 0 61 0 201 202 212 (11)
FOOD PURCHASES 54 0 102 0 103 0 123 122 123 0
BEVERAGES 1 0 1 0 2 0 4 4 4 0
SCHOOL MILK 9 0 15 0 15 0 25 20 25 0
NURSERY MILK 115 0 100 0 100 0 100 60 100 0
NURSERY FRUIT/VEG 97 0 98 0 98 0 4 4 4 0
RECHARGE OF DIRECT FOOD COSTS 3 0 3 0 4 0 8 8 8 0
PROTECTIVE CLOTHING & UNIFORMS 85 0 85 0 86 0 92 70 92 0
LAUNDRY COSTS 1 0 1 0 1 0 0 0 0 0
OTHER SUPPLIES AND SERVICES 29 0 29 0 24 0 21 11 21 0
HEALTH AND SAFETY 20 0 20 0 20 0 20 0 15 5
CATERING - CONTRACT 2,853 0 2,803 0 2,803 0 2,681 2,733 2,807 (126)
CATERING - OUTWITH CONTRACT 7 0 7 0 7 0 7 4 7 0
CATERING - EXTERNAL 6 0 7 0 7 0 12 12 12 0
ARTIST FEES / PERFORMING ARTS / ENTERTA 1 0 1 0 1 0 3 3 3 0
DELIVERY CHARGE 1 0 2 0 3 0 4 4 4 0
SUPPLIES AND SERVICES 16,041 (277) 13,896 (392) 12,976 (392) 13,658 8,219 13,740 (82)
82

Page 83

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 2 0 2 0 2 0 2 1 3 (1)
OTHER TRANSPORT COSTS 2 0 2 0 2 0 2 0 2 0
INSURANCE 3 0 3 0 3 0 3 3 3 0
FLEET SERVICE CHARGES 1,668 0 1,765 0 1,822 0 2,168 1,970 2,269 (101)
HIRE OF EXTERNAL VEHICLES 153 0 166 0 183 0 249 249 249 0
HIRE OF SKIPS 5 0 6 0 7 0 8 14 8 0
EXTERNAL TRANSPORT CONTRACT 4 0 4 0 4 0 7 16 7 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 7,935 (2,260) 8,314 (2,459) 8,386 (2,531) 5,857 5,110 8,316 (2,459)
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 9,702 (279) 9,702 (279) 9,702 (279) 9,424 8,946 10,250 (826)
PUPIL TRANSPORT - OTHER 172 0 172 0 175 0 192 80 192 0
TAXI CHARGES - CONTRACTED 0 0 0 0 0 0 0 2 0 0
TRANSPORT AND PLANT 19,646 (2,539) 20,136 (2,738) 20,286 (2,810) 17,912 16,391 21,299 (3,387)
ADMINISTRATION
PRINTING AND STATIONERY 442 0 446 0 456 0 538 437 525 13
TELEPHONES 234 0 235 0 233 0 228 134 265 (37)
MOBILE PHONES 13 0 13 0 13 0 16 0 16 0
ADVERTISING - OF COUNCIL SERVICE AVAILA 3 0 3 0 3 0 3 0 0 3
ADVERTISING - OTHER 11 0 11 0 11 0 11 0 7 4
POSTAGES/COURIERS 61 0 61 0 62 0 58 14 54 4
MEMBERSHIP FEES/SUBSCRIPTIONS 117 0 143 0 182 0 261 252 261 0
INSURANCE 76 0 76 0 76 0 76 76 76 0
MEDICAL COSTS 13 0 17 0 21 0 26 26 32 (6)
LEGAL EXPENSES 8 (8) 12 (12) 12 (12) 0 15 24 (24)
HOSPITALITY / CIVIC RECOGNITION 1 0 2 0 2 0 3 3 3 0
SECURITY UPLIFT FEES 2 0 3 0 4 0 7 7 7 0
OTHER ADMIN COSTS 2 0 2 0 2 0 2 0 0 2
CONFERENCES - OFFICIALS (incl associated costs) 0 52 0 52 0 52 52 0 1 51
TRAINING 207 0 279 0 497 0 421 388 432 (11)
ADMINISTRATION 1,190 44 1,303 40 1,574 40 1,702 1,352 1,703 (1)
PAYMENT TO OTHER BODIES
YOUTH EMPLOYMENT TRAINING 0 0 0 0 0 0 2 2 2 0
OTHER COMMITTEES OF THE AUTHORITY 0 0 28 (28) 28 (28) 25 31 33 (8)
OTHER LOCAL AUTHORITIES 1,456 (24) 1,456 (24) 1,456 (24) 1,433 1,165 2,294 (861)
SCOTTISH QUALIFICATIONS AUTHORITY 1,574 (11) 1,574 (11) 1,574 (11) 1,563 1,581 1,585 (22)
PAYMENTS TO VOLUNTARY ORGANISATIONS 10 0 10 0 10 0 10 8 10 0
PAYMENTS TO OTHER BODIES 21,070 800 20,983 800 20,690 800 21,312 16,176 20,409 903
INDEPENDENT SCHOOL PLACES 4,332 (825) 4,332 (825) 4,632 (825) 3,807 2,737 4,760 (953)
CONTRACT SPEECH THERAPY 678 0 678 0 678 0 678 0 678 0
SCHOOL ACTIVITIES 165 0 164 0 171 0 234 211 234 0
RESEARCH GRANTS - EDUCATION 47 0 47 0 39 0 43 47 43 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 28 0 28 0 28 0 28 25 20 8
P.E. FACILITIES 78 0 75 0 73 0 65 5 65 0
ACTIVITIES PROGRAMME 137 0 187 0 196 0 296 296 296 0
COUNSELLING 1,253 0 1,369 0 1,364 0 1,364 872 1,364 0
COPYRIGHT AGREEMENT 228 0 228 0 228 0 228 228 228 0
VAT FREE EXCURSIONS - EDUCATION 15 0 9 0 12 0 67 67 67 0
PRIVATE INDIVIDUALS - GENERAL 3 0 3 0 3 0 4 5 4 0
PAYMENT TO OTHER BODIES 31,074 (60) 31,171 (88) 31,182 (88) 31,159 23,456 32,092 (933)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 46,873 360 47,693 360 47,693 360 48,055 34,993 47,695 360
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 2 0 3 0 2 0 9 11 9 0
PAYMENT TO CONTRACTORS 46,875 360 47,696 360 47,695 360 48,064 35,004 47,704 360
TRANSFER PAYMENTS
RENT REBATES 288 0 303 0 371 0 563 563 563 0
FOOTWEAR & CLOTHING GRANTS 2,312 0 2,312 0 2,312 0 2,312 2,128 2,198 114
WORK EXPERIENCE 16 0 16 0 16 0 13 0 13 0
TRANSFER PAYMENTS 2,616 0 2,631 0 2,699 0 2,888 2,691 2,774 114
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 3 0 3 0 3 0 3 0 0 3
I.T. EQUIPMENT LEASING - CONTRACT 404 0 403 0 403 0 392 208 396 (4)
FINANCING CHARGES 407 0 406 0 406 0 395 208 396 (1)
TOTAL EXPENDITURE 514,002 (2,604) 514,280 (2,705) 514,247 (2,705) 519,275 379,275 521,539 (2,264)
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) 0 (170) 0 (170) 0 (170) (131) (175) 5
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (12,825) 0 (12,841) 0 (12,909) 0 (13,106) (1,768) (13,106) 0
CONTRIBUTIONS FROM OTHER BODIES (1,013) 0 (1,124) 0 (1,124) 0 (1,152) (1,165) (1,152) 0
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,544) 775 (1,544) 775 (1,544) 775 (769) (315) (1,514) 745
PLAYGROUP ACCOMMODATION CHARGE (19) 9 (20) 10 (20) 10 (12) (4) (21) 9
EARLY YEARS FEES (2,472) 1,820 (2,572) 1,920 (2,572) 1,920 (652) (1,869) (2,608) 1,956
RENTAL INCOME (20) 0 (20) 0 (20) 0 (20) (12) (17) (3)
OTHER INCOME (24) 0 (24) 0 (24) 0 (24) (19) (54) 30
ACCOMMODATION INCOME FROM USERS (882) 0 (882) 0 (882) 0 (882) (882) (882) 0
INCOME (18,969) 2,604 (19,197) 2,705 (19,265) 2,705 (16,787) (6,165) (19,529) 2,742
NET EXPENDITURE 495,033 0 495,083 0 494,982 0 502,488 373,110 502,010 478
83

Page 84

84

Page 85

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 29 December 2025 (No.10)
Finance and Corporate Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Finance Services - Strategy 2.311 2.344 (0.033) (1.43%) 2.772
Finance Services - Transactions 18.560 17.705 0.855 4.61% 15.201
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.349
Information Technology Services 8.512 8.614 (0.102) (1.20%) 11.953
Communications and Strategy Services 2.530 2.296 0.234 9.25% 2.055
Administration and Licensing Services 4.949 4.928 0.021 0.42% 4.346
Personnel Services 6.800 6.915 (0.115) (1.69%) 5.632
Total Finance and Corporate Resources 44.025 43.147 0.878 1.99% 42.308
5
85

Page 86

Finance and Corporate Resources Variance Analysis 2025/26 (Period 10) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  (35k) over  APT&C Basic, Superannuation, NI –
30k under
Finance Services
(Strategy) – (38k) over 
The projected overspend is
due to lower than budgeted
turnover during the year.   
Admin, Legal and
Licensing – (77k) over 
IT Services – (144k)
over 
Personnel – (63k) over 
Communications and
Strategy – 118k under 
Finance Services
(Transactions) – 217k
under 
The projected underspend is
due to vacant posts within the
Service.  
APT&C Overtime – (64k) over Finance Services
(Transactions) – (54k)
over 
Overtime costs have arisen
due to staffing vacancies and
absences, combined with
minimum staffing
requirements and unplanned
operational pressures,
requiring additional hours to
maintain service delivery. 
Property Costs 858k under Other Property Costs – 878k under Finance Services
(Transactions) – 878k
under 
The projected underspend
reflects less than budgeted
spend on Empty Property
Relief. 
86

Page 87

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and Services (120k) over Computer Equipment Purchase –
(105k) over
Finance Services
(Transactions) – (66k)
over 
The projected overspend is
due to Maintenance of Fire
and Intruder Alarms. 
Admin, Legal and
Licensing – (32k) over
The projected overspend is
due to new equipment
requirements for the Area
Committees.  
I.T. Electronic Maintenance – Contract
- (59k) over
Finance Services
(Transactions) – (32k)
over 
The projected overspend is
due to higher than budgeted
charges for IT leasing
charges. 
Outsourced Mail – (41k) over Finance Services
(Transactions) – (41k)
over
The projected overspend
reflects additional postage
costs required for service
delivery. 
Administration (161k) over Postages and Couriers – (170k) over  Finance Services
(Transactions) – (154k)
over 
The projected overspend
reflects additional postage
costs required for service
delivery.  
Medical Costs – 45k under  Personnel – 49k under The projected underspend is
due to lower than budgeted
medical charges offset by the
income. 
Members Allowances – 66k under  Administration, Legal
and Licensing – 66k
under
The projected underspend is
due to reduced
superannuation contributions
in the financial year.
87

Page 88

Subjective Head Variance  Subjective line Service / amount Explanation
Administration (cont.)  Training – (67k) over IT Services – (37k) over 
Finance Services
(Transactions) – (23k)
over 
The projected overspend
relates to Fusion Support
Training. 
The projected overspend
relates to additional
Procurement Training. 
Transfer Payments 504k under Rent Allowance – 451k under 
Rent Rebates – 53k under
Finance Services
(Transactions) – 451k
under 
Finance Services
(Transactions) – 53k
under 
The underspend in these
lines reflects the demand-led
spend on Rent Allowance
and Rent Rebates and is
offset by an under-recovery
of Income (below).
Financing Charges (95k) over IT Equipment Leasing Contract –
(94k) over
Personnel – (42k) over 
Finance Services
(Transactions) – (39k)
over 
IT Services – (17k) over 
The projected overspend in
Financing Charges is due to
higher than budgeted IT
leasing charges and is offset
by an over recovery in IT
Services - Other Income
(below).
Income  (16k) under
recovered
Statutory Additions – Cost of
Collection – 163k over recovered 
Finance Services
(Transactions) – 163k
over recovered 
The projected over-recovery
of income relates to Non-
Domestic Rates.
88

Page 89

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)   Rent Rebates Subsidy – 69k over
recovered 
Rent Allowance Subsidy – (263k)
under recovered 
Finance Services
(Transactions) – 69k
under recovered 
Finance Services
(Transactions) – (263k)
under recovered 
The projected under recovery
in these lines is offset by the
demand-
led underspend in Transfer
Payments (above).  
Contributions from Other Bodies –
(81k) under recovered 
Finance Services
(Transactions) – (78k)
under recovered 
The under-recovery reflects
lower than budgeted income
for Housing Benefit
overpayments as a result of
the final migration from
legacy benefits to universal
credit for working age. 
Fees and Charges – General – 434k
over recovered
Finance Services
(Transactions) – 302k
over recovered 
The projected over-recovery
of income reflects additional
commission received from
Scottish Water for the
collection of water and
sewage and blue badge
applications. 
Admin, Legal and
Licensing – 117k over
recovered
The projected over-recovery
of income reflects renewal
fees for private hires and
operators. 
89

Page 90

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges – Departments of
the Authority – 72k over recovered 
Communications and
Strategy – 72k over
recovered
The projected over-recovery
reflects the demand for Royal
Mail postages and
outsourced mail. 
Other Income – (380k) under
recovered
Finance Services
(Transactions) – (412k)
under recovered 
Personnel – (44k)
under recovered 
IT Services – 75k over
recovered 
The reflects lower than
budgeted income for Housing
Benefit overpayments as a
result of the final migration
from legacy benefits to
universal credit for working
age. 
The projected under-recovery
is due to lower than expected
level of medical charges
offset by overspend in
Administration cost (above). 
The over-recovery of income
reflects the increased
recharges of IT spend to
Resources and is offset by
overspend in Financing
Charges (above). 
* The underlined variances represent new variances since the last report.
90

Page 91

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT & C BASIC 28,855 (214) 29,004 (315) 28,911 (165) 28,957 20,987 28,836 121
APT & C OVERTIME 71 27 94 4 109 (11) 98 141 162 (64)
APT & C SUPERANNUATION 1,826 43 1,850 26 1,854 38 1,901 1,339 1,838 63
APT & C NIC 3,658 (152) 3,689 (173) 3,715 (192) 3,544 2,668 3,699 (155)
APT & C TRAVEL EXPENSES 10 (8) (26) 28 (25) 27 2 21 3 (1)
TRAVEL AND SUBSISTANCE 1 0 1 0 1 0 1 0 1 0
MSC TRAINEES BASIC 0 0 0 0 0 0 0 4 0 0
OTHER EMPLOYEE COSTS 0 0 0 0 0 0 180 0 180 0
PENSION INCREASES 993 (1) 993 (1) 992 0 992 696 992 0
EMPLOYEE COSTS 35,414 (305) 35,605 (431) 35,557 (303) 35,675 25,856 35,711 (36)
PROPERTY COSTS
RATES 0 0 0 0 0 0 12 12 12 0
RENT 4 0 4 0 4 0 4 3 4 0
SECURITY COSTS 141 (20) 141 (20) 141 (20) 121 109 141 (20)
REPAIRS & MAINTENANCE - INTERNAL CONTRATOR 0 0 0 0 0 0 3 0 3 0
ELECTRICITY  - CONTRACT 0 0 0 0 0 0 3 4 3 0
FIXTURE & FITTINGS 1,707 0 1,707 0 1,707 0 1,707 1,340 1,707 0
HEALTH & HYGIENE MATERIALS 140 0 140 0 140 0 140 42 140 0
OTHER PROPERTY COSTS 1,657 226 1,657 226 1,883 0 1,883 0 1,005 878
PROPERTY COSTS 3,649 206 3,649 206 3,875 (20) 3,873 1,510 3,015 858
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 4,669 (124) 4,629 (26) 4,660 (28) 5,155 5,146 5,260 (105)
COMPUTER EQUIPMENT MAINTENANCE 2,039 2 2,094 (53) 2,105 (64) 2,141 2,303 2,155 (14)
I.T. EQUIPMENT MAINT - CONTRACT 670 (7) 678 (15) 675 (13) 663 466 722 (59)
I.T. ELECTRONIC MESSAGING 36 0 36 0 33 3 36 0 4 32
EQUIPMENT, APPARATUS AND TOOLS 151 0 151 0 151 0 151 56 134 17
SUPPLIES FOR CLIENTS 79 0 79 0 79 0 79 41 79 0
FURNITURE - OFFICE 1 0 1 0 1 0 1 3 4 (3)
MATERIALS 112 0 112 0 112 0 112 48 73 39
MATERIALS, APPARATUS AND EQUIPMENT 2 0 2 0 2 0 2 1 3 (1)
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0 2 0 2 0 2 0
FOODSTUFFS - GENERAL 2 0 0 0 0 0 0 0 0 0
PROVISIONS - GENERAL 20 0 20 0 20 0 20 4 20 0
FOOD PURCHASES WITHIN CONTRACT 1 0 1 0 1 0 1 0 1 0
BEVERAGES 2 0 2 0 2 0 2 1 2 0
PROTECTIVE CLOTHING & UNIFORMS 1 1 1 1 0 2 2 1 1 1
OTHER SUPPLIES AND SERVICES 234 0 245 0 253 0 458 424 450 8
HEALTH AND SAFETY 0 0 0 0 0 0 58 23 58 0
CATERING - OUTWITH CONTRACT 6 0 6 0 6 0 6 0 0 6
OUTSOURCED MAIL 209 (35) 219 (45) 213 (39) 174 124 215 (41)
SUPPLIES AND SERVICES 8,236 (163) 8,278 (138) 8,315 (139) 9,063 8,641 9,183 (120)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 1 0 0
POOL CAR CHARGES - RENTAL 15 0 15 0 14 1 15 2 5 10
POOL CAR CHARGES - FUEL 3 0 3 0 3 0 3 0 0 3
FLEET SERVICE CHARGES 17 0 15 0 15 0 15 14 15 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 0 1 (1)
TRANSPORT AND PLANT 35 0 33 0 32 1 33 17 21 12
ADMINISTRATION
PRINTING AND STATIONERY 531 (3) 533 (5) 544 (17) 528 278 538 (10)
TELEPHONES 1,551 0 1,551 1 1,554 (3) 1,551 1,009 1,550 1
MOBILE PHONES 174 0 173 1 173 1 174 51 170 4
ADVERTISING - RECRUITMENT 29 0 29 0 29 0 29 42 54 (25)
ADVERTISING - OTHER 125 (1) 124 0 125 (1) 124 70 127 (3)
POSTAGES/COURIERS 948 (40) 951 (43) 1,062 (154) 908 712 1,078 (170)
SMS MESSAGING 5 0 5 0 5 0 5 5 7 (2)
MEMBERSHIP FEES/SUBSCRIPTIONS 251 (20) 251 (20) 250 (19) 269 281 266 3
INSURANCE 141 0 141 0 141 0 141 141 141 0
MEDICAL COSTS 351 (1) 348 2 348 2 350 239 305 45
LEGAL EXPENSES 170 (3) 170 (3) 187 (20) 167 108 168 (1)
HOSPITALITY / CIVIC RECOGNITION 31 0 31 0 31 0 31 15 31 0
PAYPOINT AGENCY FEES 70 0 70 0 70 0 70 49 75 (5)
SECURITY UPLIFT FEES 2 0 2 0 2 0 2 1 2 0
OTHER ADMIN COSTS 576 0 576 0 576 0 632 616 633 (1)
MEMBERS ALLOWANCES 1,797 50 2,273 62 2,271 64 2,335 1,647 2,269 66
CONFERENCES - MEMBERS (incl associated costs) 11 0 11 0 11 0 11 5 11 0
CONFERENCES - OFFICIALS (incl associated costs) 5 0 5 0 5 0 5 1 1 4
TRAINING 800 (39) 803 (42) 808 (47) 761 438 828 (67)
VOLUNTEERS' EXPENSES 8 0 8 0 8 0 16 12 16 0
INTERNAL SUPPORT SERVICES ALLOCATION 68 0 68 0 68 0 68 0 68 0
ADMINISTRATION 7,644 (57) 8,123 (47) 8,268 (194) 8,177 5,720 8,338 (161)
PAYMENT TO OTHER BODIES
OTHER LOCAL AUTHORITIES 4 0 4 0 4 0 4 0 0 4
GRANTS TO VOLUNTARY ORGANISATIONS 408 0 408 0 408 0 483 485 483 0
PAYMENTS TO OTHER BODIES 2,277 (4) 2,277 (4) 2,347 (4) 2,383 2,009 2,448 (66)
EXTERNAL AUDIT FEES 665 0 665 0 665 0 665 323 665 0
PRIVATE INDIVIDUALS - GENERAL 0 0 10 (10) 10 (10) 0 0 0 0
PAYMENT TO OTHER BODIES 3,354 (4) 3,364 (14) 3,434 (14) 3,535 2,817 3,596 (62)
91

Page 92

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 28 0 28 0 0 0 0 14 1 (1)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 274 (18) 274 (18) 274 (18) 291 141 297 (6)
PAYMENT TO CONTRACTORS 302 (18) 302 (18) 274 (18) 291 155 298 (7)
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 0 23,581 0 23,581 0 17,581 13,393 17,130 451
RENT REBATES 42,343 0 42,344 0 42,344 0 31,482 22,344 31,429 53
TRANSFER PAYMENTS 65,924 0 65,925 0 65,925 0 49,063 35,737 48,559 504
FINANCING CHARGES
LEASING CHARGES - FINANCE 0 0 0 0 0 0 0 (1) 1 (1)
I.T. EQUIPMENT LEASING-CONTRACT 1,463 (47) 1,462 (46) 1,485 (69) 1,416 1,415 1,510 (94)
FINANCING CHARGES 1,463 (47) 1,462 (46) 1,485 (69) 1,416 1,414 1,511 (95)
TOTAL EXPENDITURE 126,021 (388) 126,741 (488) 127,165 (756) 111,126 81,867 110,232 893
INCOME
STATUTORY ADDITIONS - COST OF COLLECTION (865) 0 (865) 0 (1,127) 262 (865) 0 (1,028) 163
RENT REBATES SUBSIDY (37,191) 0 (37,191) 0 (37,191) 0 (26,191) (18,306) (26,260) 69
RENT ALLOWANCE SUBSIDY (23,067) 0 (23,067) 0 (23,067) 0 (17,067) (13,682) (16,804) (263)
DWP SUBSIDY (1,170) 0 (1,170) 0 (1,170) 0 (1,170) (899) (1,165) (5)
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (150) 0 (150) 0 (150) 0 (150) (105) (150) 0
CONTRIBUTIONS FROM OTHER BODIES (296) 0 (333) 0 (335) 2 (333) (235) (252) (81)
SALES - DEPARTMENTS OF THE AUTHORITY (20) 0 (20) 0 (20) 0 (20) 0 0 (20)
FEES AND CHARGES - GENERAL (4,914) 388 (5,013) 487 (5,096) 505 (4,627) (2,585) (5,061) 434
CHARGES TO HEALTH BOARDS (45) 0 (45) 0 (45) 0 (45) 0 (45) 0
FEES AND CHARGES - OTHER BODIES (221) 0 (221) 0 (221) 0 (221) (151) (221) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,488) 0 (2,488) 0 (2,488) 0 (2,488) (1,631) (2,560) 72
HOME LOANS REPAYMENTS (5) 0 (4) 0 (5) 0 (5) (18) (5) 0
BIRTH REGISTRATION (16) 0 (16) 0 (16) 0 (16) (11) (14) (2)
DEATH REGISTRATION (64) 0 (63) (1) (63) (1) (64) (42) (60) (4)
MARRIAGE STATUTORY FEES (108) 0 (110) 2 (110) 2 (108) (87) (99) (9)
EXTRACT ISSUE (83) 0 (83) 0 (83) 0 (83) (63) (83) 0
MARRIAGES (52) 0 (50) (2) (63) 11 (52) (40) (61) 9
CITIZENSHIP CEREMONIES (18) 0 (20) 2 (20) 2 (18) (15) (20) 2
CIVIL PARTNERSHIPS (1) 0 0 (1) 0 (1) (1) 0 0 (1)
OTHER INCOME (6,892) 0 (6,893) 1 (6,866) (26) (6,900) (1,689) (6,520) (380)
REALLOCATION OF CENTRAL SUPPORT COSTS (6,668) 0 (6,668) 0 (6,668) 0 (6,668) 0 (6,668) 0
REALLOCATION OF SUPPORT COSTS (9) 0 (9) 0 (9) 0 (9) 0 (9) 0
INCOME (84,343) 388 (84,479) 488 (84,813) 756 (67,101) (39,559) (67,085) (16)
NET EXPENDITURE 41,678 0 42,262 0 42,352 0 44,025 42,308 43,147 877
92

Page 93

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 29 December 2025 (No.10)
Housing and Technical Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Housing Services 8.246 8.063 0.183 2.22% 7.597
Property Services 10.727 10.787 (0.060) (0.56%) 3.270
Total Housing and Technical Resources 18.973 18.850 0.123 0.65% 10.867
5
93

Page 94

Housing and Technical Resources (excl HRA) Variance Analysis 2025/26 (Period 10) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,764k
under 
APT&C Basic / Overtime /
Superannuation / National
Insurance – 1,396k under 
Manual Workers – 367k under
Property Services –
1,406k under 
Property Services –
367k under
The variance relates to vacancies which
are actively being recruited in line with
Service requirements. 
The variance relates to the current level
of trade operatives and overtime required
to meet service demands.     
Property Costs (1,185k)
over
Rates – (122k) over  Property Services –
(122k) over 
The variance relates to greater than
budgeted rates charges for Council
properties mainly within the Estates
Service. 
Scottish Water – Metered
Charges – (97k) over 
Property Services –
(90k) over 
The overspend related to increase water
charges within the Office Accommodation
and Estates services. 
Service Charge – (233k) over Property Services –
(202k) over
The overspend relates to the cost of
shopping centre service charges which
are not recoverable from tenants. 
Bed & Breakfast – (354k) over  Housing Services –
(354k) over 
The variance relates to greater than
budgeted demand for bed & breakfast
within the Homelessness service. 
Security Costs – (83k) over  Property Services –
(83k) over
This variance relates to greater
expenditure on CCTV security costs than
is currently budgeted, due to CCTV
infrastructure project delay. 
94

Page 95

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont) 
Repairs & Maintenance – Life
Cycle Maintenance – (654k) over 
Housing Services –
(227k) over 
The overspend relates to additional
expenditure on the maintenance of
homelessness property. 
Property Services –
(427k) over 
The overspend relates to additional
expenditure on the maintenance of the
corporate estate. 
Housing Rent unlet period – 265k
under
Property Services –
221k under
The underspend is due to lower than
expected unlet properties within the
Estates service.  
Electricity/Contract – 60k under Property Services –
49k under 
This relates to the current market prices
for utilities, which are lower than budget.  
Other Property Costs – 126k
under
Housing Services –
131k under
The underspend relates to additional
funding received for Ukraine
Resettlement and due to the timing of
award, will be transferred to reserves at
the end of the financial year. 
Supplies &
Services
(985k) over  Stock/ Stores Issues – (994k)
over
Property Services –
(994k) over
This mainly relates to the changes in the
work mix in relation to work undertaken
directly or sub-contracted.     
Transport & Plant (398k) over Purchase Of Plant & Equipment
– (168k) over 
Property Services –
(168k) over 
The overspend relates to the
replacement of tools within Building
Services. 
95

Page 96

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont) 
Fleet Service Charges – (183k)
over
Property Services –
(217k) over
The underspend relates to greater than
budgeted fleet service charges on
leasing, fuel and vehicle maintenance
within Building Services.  
Hire of External
Plant/Scafolding/Skips – (53k)
over 
Property Services –
(53k) over
Expenditure on hires varies depending on
the workload demands and timing of
works on a wide variety of capital and
revenue works. 
Payment to
Other Bodies 
(508k) over  Other Committees of the Author
– (351k) over
Property Services –
(152k) over 
The overspend relates to greater than
budgeted recovery of internal support
costs within Building Services. 
Assistance to Home Owners –
(72k) over 
Property Services –
(72k) over
This variance reflects the timing of spend
on grants to owners to date.  
Private Individuals – (100k) over Housing Services –
(100k) over
The variance relates to greater forecast
expenditure on payments towards
Tenancy Sustainment Fund within the
Homelessness Service. 
Payment to
Contractors 
(774k) over Payment to Private Contractors –
776k under
Property Services –
511k under
The overspend relates to the significant
increase in work due to the substantial
backlog of storm damage works resulting
from the severe adverse weather.     
Housing Services –
265k under 
The underspend relates to commissioned
services in the Homelessness budget
where expenditure varies according to
service requirements.     
96

Page 97

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors
(cont)
Payment to External Consultant
– (1,550k) over 
Property Services –
(1,550k) over 
This overspend is mainly due to the
nature of some major projects requiring
increased use of specialist consultants
and is partially offset by an underspend in
employee costs. 
Income  2,354k over
recovered 
Rental Income – (563k) under
recovered 
Property Services –
(563k) under
recovered
Income is over recovered due to greater
than budgeted rental income within Office
Accommodation.     
House Rents – 328k over
recovered 
Housing Services –
328k over recovered
The over recovery relates to more house
rent income than budgeted within the
Homelessness service.     
Recovery from
Capital/Recharges – 2,215k over
recovered 
Property Services –
2,215k over
recovered 
The level of income recovered varies
depending on the current workload, the
timing of a wide variety of projects and is
offset by a reduction in expenditure. 
97

Page 98

South Lanarkshire Council
Housing & Technical Resources Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
Expenditure / Income Variance Trends 2025/2026 (Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT & C BASIC 16,623 1,101 16,567 1,169 16,923 815 17,671 11,742 16,633 1,038
APT & C OVERTIME 52 143 52 144 69 127 195 107 96 99
APT & C SUPERANNUATION 1,083 92 1,056 119 1,095 80 1,165 752 1,075 90
APT & C NIC 2,141 180 2,117 204 2,172 149 2,309 1,505 2,140 169
10100-APT&C - GENERAL / 0708-PAYMENT IN LIEU 0 0 0 0 0 0 0 1 0 0
CARE STAFF - NATIONAL INSURANCE 21,057 566 21,062 561 21,312 311 21,623 14,751 21,089 534
MANUAL OVERTIME 393 (55) 393 (55) 538 (200) 338 828 695 (357)
MANUAL SUPERANNUATION 1,349 53 1,349 53 1,371 31 1,402 949 1,353 49
MANUAL NIC 2,805 76 2,805 76 2,777 104 2,881 1,933 2,740 141
TRAVEL AND SUBSISTANCE 15 10 17 8 13 12 23 3 13 10
OTHER EMPLOYEE COSTS (22) 0 (18) (4) (22) 0 (22) (30) (18) (4)
PENSION INCREASES 616 (14) 614 1 608 7 615 454 617 (2)
ADDITIONAL PENSION COSTS 0 13 0 0 0 0 0 0 0 0
APPRENTICESHIP LEVY 3 0 0 3 3 0 0 0 3 (3)
EMPLOYEE COSTS 46,115 2,165 46,014 2,279 46,859 1,436 48,200 32,995 46,436 1,764
PROPERTY COSTS
RATES 2,222 (23) 2,252 (34) 2,252 (5) 2,253 1,826 2,375 (122)
SCOTTISH WATER - UNMETERED CHARGES 8 4 8 4 8 4 8 1 10 (2)
SCOTTISH WATER - METERED CHARGES 280 (48) 302 (70) 310 (78) 236 216 333 (97)
RENT 1,851 (25) 1,864 1 1,865 0 1,860 1,308 1,871 (11)
SERVICE CHARGE 420 19 420 0 420 0 420 386 653 (233)
FACTORING CHARGES 5 4 5 0 5 0 5 0 0 5
OTHER ACCOMMODATION COSTS 2,986 0 3,489 0 3,539 (192) 3,497 3,325 3,495 2
BED AND BREAKFAST 159 (32) 220 (61) 316 (289) 27 240 381 (354)
PROPERTY INSURANCE 448 (18) 449 (19) 449 (19) 430 138 443 (13)
SECURITY COSTS 322 (62) 322 (62) 337 (77) 260 171 343 (83)
GROUND MAINTENANCE 52 0 52 0 52 0 52 52 52 0
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 0 10 0 10 0 10 2 5 5
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 3,472 0 3,427 0 3,427 0 3,316 2,195 3,372 (56)
LIFE CYCLE MAINTENANCE 5,073 (14) 5,070 (14) 5,068 (14) 5,054 3,296 5,037 17
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 354 (5) 349 0 374 (25) 349 925 964 (615)
ADAPTIONS - INTERNAL CONTRACTORS 0 0 0 0 0 0 0 71 0 0
HOUSING - RENT W/O UNLET PERIODS 822 0 735 76 746 65 859 360 594 265
HOUSING - RENT W/O BAD PERIODS 889 (45) 816 (48) 816 (48) 768 463 771 (3)
ASBESTOS 0 0 0 0 0 0 0 304 0 0
WATER QUALITY 0 0 0 0 0 0 0 1 0 0
FIXED ELECTRICAL 0 0 0 0 0 0 0 34 25 (25)
EPC 0 0 0 0 0 0 0 9 0 0
ELECTRICITY  - CONTRACT 1,549 (4) 1,524 28 1,524 28 1,522 814 1,462 60
ELECTRICITY  - NON CONTRACT 27 0 27 0 27 0 27 19 29 (2)
GAS 521 0 503 12 503 12 514 370 495 19
HEATING OIL 12 0 11 1 12 0 12 9 11 1
FIXTURE & FITTINGS 872 0 888 (42) 878 (32) 839 1,610 859 (20)
JANITOR SERVICE 152 12 152 8 152 0 152 109 152 0
CLEANING CONTRACT 404 2 404 (11) 397 4 401 352 416 (15)
CLEANING OUTWITH CONTRACT 0 0 0 0 0 0 0 9 0 0
CLEANING MATERIALS 10 0 10 0 10 0 10 3 3 7
HEALTH & HYGIENE MATERIALS 0 0 0 0 0 0 0 0 1 (1)
WINDOW CLEANING 2 0 2 0 2 0 2 1 2 0
PEST CONTROL 6 0 6 0 6 0 6 0 1 5
REFUSE UPLIFT 397 2 393 2 392 3 395 21 399 (4)
REMOVAL & STORAGE COSTS 37 0 42 0 42 0 48 29 24 24
OTHER PROPERTY COSTS 746 (101) 623 22 746 (101) 745 601 619 126
OFFICE ACCOM-FACILITIES MANAGEMENT 1,089 (53) 1,089 (53) 1,089 (53) 1,047 789 1,092 (45)
ACCOMMODATION RECHARGE TO USERS 53 (20) 53 (20) 53 (20) 33 41 53 (20)
PROPERTY COSTS 25,250 (407) 25,517 (280) 25,827 (837) 25,157 20,100 26,342 (1,185)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 521 15 521 15 521 15 520 272 519 1
COMPUTER EQUIPMENT MAINTENANCE 29 (23) 29 (23) 6 0 6 0 0 6
I.T. EQUIPMENT MAINT-CONTRACT 218 (9) 212 (3) 212 (3) 207 15 217 (10)
EQUIPMENT, APPARATUS AND TOOLS 45 0 45 0 45 0 45 0 45 0
ADAPTATIONS FOR CLIENTS 500 0 500 0 500 0 500 397 503 (3)
FURNITURE - OFFICE 0 0 0 0 1 (1) 0 3 3 (3)
FURNISHINGS 0 0 0 0 0 0 0 94 0 0
MATERIALS 10,659 1,379 10,659 1,379 10,469 1,379 9,848 3,893 9,848 0
STOCK/STORE ISSUES 0 0 0 0 0 0 0 2,685 994 (994)
MATERIALS, APPARATUS AND EQUIPMENT 0 0 0 0 0 0 0 2 0 0
AUDIO VISUAL 10 0 10 0 10 0 10 1 10 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 0 2 2 0 0 0 0 0
TV LICENCES - EDUCATION 1 0 0 1 1 0 1 1 1 0
FOODSTUFFS - GENERAL 1 0 0 1 1 0 0 0 0 0
FOOD PURCHASES WITHIN CONTRACT 0 0 0 0 0 0 0 11 0 0
BEVERAGES 1 0 1 0 0 2 0 0 1 (1)
PROTECTIVE CLOTHING & UNIFORMS 44 0 44 0 44 0 44 29 42 2
OTHER SUPPLIES AND SERVICES 91 1 87 1 87 1 76 26 58 18
HEALTH AND SAFETY 1 0 1 0 1 0 1 0 0 1
CATERING - CONTRACT 1 0 0 1 1 0 0 0 0 0
OUTSOURCED MAIL 2 (2) 2 (2) 2 (2) 0 16 2 (2)
DELIVERY CHARGE 0 0 0 0 0 0 0 1 0 0
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 (4) 0 0
SUPPLIES AND SERVICES 12,126 1,361 12,111 1,372 11,903 1,391 11,258 7,442 12,243 (985)
98

Page 99

South Lanarkshire Council
Housing & Technical Resources Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
Expenditure / Income Variance Trends 2025/2026 (Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 0 0 0 4 0 0
PURCHASE OF PLANT 125 0 125 0 125 0 125 158 293 (168)
FLEET SERVICES - FUEL 0 3 0 3 0 3 3 21 4 (1)
FLEET SERVICES - VEHICLE HIRE 0 0 0 0 0 0 0 0 0 0
POOL CAR RECHARGE - RENTAL CHARGE 42 11 44 9 43 10 54 20 58 (4)
POOL CAR RECHARGE - FUEL 9 9 9 9 9 9 18 0 7 11
POOL CAR RECHARGE - ADDITIONAL CHARGES 0 1 0 1 0 1 1 0 0 1
OTHER TRANSPORT COSTS 1 (1) 1 (1) 1 (1) 0 1 3 (3)
TRANSPORT INSURANCE 44 0 44 0 44 0 44 44 43 1
LICENCES 0 0 0 0 0 0 0 1 0 0
PLANT SERVICES 7 0 7 0 7 0 7 10 7 0
FLEET SERVICE CHARGES 2,821 137 2,821 137 2,820 138 2,968 2,108 3,151 (183)
HIRE OF EXTERNAL PLANT 240 17 240 17 240 17 257 92 230 27
HIRE OF SCAFOLDING 1,031 46 1,031 46 1,033 44 1,077 588 1,156 (79)
HIRE OF SKIPS 13 20 13 20 12 21 33 341 34 (1)
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 8 6 7 1
TAXI CHARGES - CONTRACTED 11 0 12 0 11 1 5 5 5 0
TRANSPORT AND PLANT 4,344 243 4,347 241 4,345 243 4,600 3,399 4,998 (398)
ADMINISTRATION
PRINTING AND STATIONERY 79 (3) 79 (3) 79 (3) 77 55 84 (7)
TELEPHONES 102 (8) 100 2 103 (1) 101 28 97 4
MOBILE PHONES 39 0 39 0 39 0 40 1 43 (3)
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 0 7 0 7 0 7 0 0 0 0
ADVERTISING - OTHER 6 0 6 0 6 0 6 1 1 5
POSTAGES/COURIERS 26 (5) 27 (13) 26 (12) 12 28 23 (11)
MEMBERSHIP FEES/SUBSCRIPTIONS 15 (3) 15 (3) 15 (3) 15 1 16 (1)
INSURANCE 216 0 216 0 216 0 216 210 230 (14)
MEDICAL COSTS 16 0 16 1 16 1 16 33 16 0
LEGAL EXPENSES 14 0 17 (1) 14 2 19 18 24 (5)
PETTY OUTLAYS 12 0 12 0 12 0 12 13 14 (2)
HOSPITALITY / CIVIC RECOGNITION 2 0 2 0 2 0 3 1 3 0
PAYPOINT AGENCY FEES 0 0 0 0 0 0 0 4 0 0
OTHER ADMIN COSTS 8 0 8 0 8 0 8 0 7 1
MEMBERS ALLOWANCES 0 0 0 0 0 0 0 0 0 0
TRAINING 2 (2) 2 (2) 2 (2) 0 31 1 (1)
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 457 0 457 0 457 0 511 (54)
CENTRAL ADMINISTRATION 2,749 0 2,749 0 2,749 0 2,749 0 2,803 (54)
ADMINISTRATION 3,743 (14) 3,745 (12) 3,744 (11) 3,731 424 3,873 (142)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,013 0 1,813 200 2,122 (109) 2,463 728 2,814 (351)
OTHER LOCAL AUTHORITIES 0 0 0 0 0 0 0 12 0 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 0 0 0 0 0 0 0 0 1 (1)
PAYMENTS TO OTHER BODIES 1,771 (115) 1,972 (316) 1,663 (7) 1,743 1,452 1,727 16
SUPPORTING PEOPLE INTERNAL PROVIDER 1,129 0 1,129 0 1,129 0 1,129 869 1,129 0
SUPPORTING PEOPLE EXTERNAL PROVIDER 419 (14) 419 0 419 0 419 251 419 0
HOUSING ADMINISTRATION 885 0 885 0 885 0 885 681 885 0
ASSISTANCE TO HOME OWNERS 1,091 0 1,156 (65) 1,340 (249) 1,578 824 1,650 (72)
PRIVATE INDIVIDUALS - GENERAL 151 0 151 0 151 0 151 223 251 (100)
PAYMENT TO OTHER BODIES 7,459 (129) 7,525 (181) 7,709 (365) 8,368 5,040 8,876 (508)
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 0 0 0 148 0 0
PAYMENT TO PRIVATE CONTRACTOR 17,109 (1,864) 17,153 (1,863) 16,930 (1,640) 17,216 11,510 16,440 776
PAYMENT TO EXTERNAL CONSULTANTS 2,113 (1,807) 2,113 (1,807) 2,113 (1,807) 306 1,883 1,856 (1,550)
PAYMENT TO CONTRACTORS 19,222 (3,671) 19,266 (3,670) 19,043 (3,447) 17,522 13,541 18,296 (774)
TRUST FUND EXPENDITURE
TRANSFER PAYMENTS
FINANCING CHARGES
DEPRECIATION-CAP CHARGES 0 0 0 0 3 (3) 0 0 3 (3)
I.T. EQUIPMENT LEASING-CONTRACT 158 (5) 158 (5) 158 (5) 154 14 154 0
INTEREST ON REVENUE BALANCES 2 0 2 0 2 0 2 0 2 0
FINANCING CHARGES 160 (5) 160 (5) 163 (8) 156 14 159 (3)
TOTAL EXPENDITURE 118,419 (457) 118,685 (256) 119,593 (1,598) 118,992 82,955 121,223 (2,231)
INCOME
CONTRIBUTIONS FROM OTHER BODIES (2,265) (46) (2,189) (169) (2,358) 0 (3,002) (2,267) (3,270) 268
SALES - DEPARTMENTS OF THE AUTHORITY (460) 0 (460) 0 (460) 0 (460) 0 (453) (7)
FEES AND CHARGES - GENERAL (745) 105 (838) 101 (815) 269 (546) (387) (588) 42
FEES AND CHARGES - DEPARTMENTS OF THE A (46) (2) (46) 0 (46) 0 (46) 0 (48) 2
RENTAL INCOME (4,104) (135) (3,875) (222) (3,875) (222) (4,209) (2,741) (3,646) (563)
HOUSE RENTS (6,755) 0 (7,071) 1 (6,984) (4) (7,488) (5,139) (7,816) 328
INSURANCE RECOVERIES (26) 26 (26) 26 (26) 26 0 0 0 0
OTHER INCOME (2,754) 5 (2,762) 15 (2,749) 2 (2,747) (1,743) (2,709) (38)
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 (876) 0 (876) 0 (876) (487) (876) 0
REALLOCATION OF SUPPORT COSTS (1,630) 0 (1,630) 0 (1,556) (74) (1,630) (257) (1,737) 107
RECOVERY FROM CAPITAL (24,712) (5,023) (24,712) (5,023) (27,118) (2,617) (29,735) (17,437) (26,521) (3,214)
RECHARGES - DEPARTMENTS OF AUTHORITY (54,807) 5,527 (54,807) 5,527 (53,498) 4,218 (49,280) (36,864) (54,709) 5,429
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 0 0 0 0 0 0 (4,766) 0 0
INCOME (99,180) 457 (99,292) 256 (100,361) 1,598 (100,019) (72,088) (102,373) 2,354
NET EXPENDITURE 19,239 0 19,393 0 19,232 0 18,973 10,867 18,850 123
99

Page 100

100

Page 101

Appendix E
Housing and Technical Resources (HRA) Variance Analysis 2025/26 (Period 10) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 65k under  APT&C Basic/Overtime/
Superannuation/National
Insurance/Travel & Subsistence
– 65k under
HRA The underspend is mainly due to
vacancies across the service. 
Property Costs 172k under  Grounds Maintenance / Grounds
Maintenance Additional – 65k  
Under 
HRA  The forecast underspend is due to lower
than anticipated charges for special
uplifts. 
Housing – Rent Free
Accommodation/Write off Unlet
Periods/Bad Periods – 285k
under 
HRA The net underspend reflects a lower than
anticipated level of bad debt provision.
During the year, collection rates for rental
income have been better than forecast,
which is due in part to schemes such as
the tenancy sustainment fund mitigating
the overall level of debt. 
Fixtures and Fittings – (66k) over  HRA This budget is demand led and the
overspend reflects the increased demand
during the year. 
Cleaning Contract – (107k) over  HRA The overspend is due to greater than
budgeted charges for Facilities
Management cleaning charges within the
overall HRA service. 
Pest Control – (70k) over  HRA The overspend is due to increased
demand for pest control services within
the overall HRA service.
5
101

Page 102

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs
67k under Postages/Couriers – 57k under HRA The forecast underspend is due to lower
than anticipated postages costs being
incurred due to information being
distributed online. 
Payment to
Other Bodies 
(391k) over  Payment To Other Bodies –
(423k) over
HRA This includes payments in relation to new
systems for which we are expecting a
transfer of budget from reserves 
Income 208k over 
recovered 
Fees and Charges – General –
(138k) under recovered
HRA The under recovery reflects lower than
anticipated income from laundry charges.  
House/Lock Up Rents – 57k over
recovered
HRA The over recovery is due to the timing of
new builds which were completed ahead
of the anticipated profiles. 
Year End Transfer from the
Balance Sheet – 287k over
recovered 
HRA The budget assumes a level of transfer
from reserves, due to the current net
overspend across the service. 
* The underlined variances represent new variances since the last report. 
102

Page 103

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Housing and Revenue Account Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT & C BASIC 12,511 80 12,550 31 12,608 69 12,591 9,260 12,671 (80)
APT & C OVERTIME 62 7 30 39 22 47 69 24 29 40
APT & C SUPERANNUATION 813 7 810 12 818 4 820 587 818 2
APT & C NIC 1,563 63 1,565 64 1,550 79 1,626 1,123 1,556 70
TRAVEL AND SUBSISTANCE 3 32 10 25 2 33 35 3 2 33
PENSION INCREASES 219 0 243 (24) 219 0 219 158 219 0
EMPLOYEE COSTS 15,171 189 15,208 147 15,219 232 15,360 11,155 15,295 65
PROPERTY COSTS
RATES 72 0 72 0 79 (7) 72 78 78 (6)
SCOTTISH WATER - UNMETERED CHARGES 4 0 4 0 4 0 4 0 0 4
SCOTTISH WATER - METERED CHARGES 8 0 8 0 8 0 8 6 17 (9)
RENT 6 0 6 0 6 0 6 0 0 6
SERVICE CHARGE 94 0 94 0 94 0 94 5 118 (24)
FACTORING CHARGES 0 0 0 0 0 0 0 0 4 (4)
OTHER ACCOMMODATION COSTS 11 0 11 0 11 0 1 23 0 1
PROPERTY INSURANCE 2,268 0 2,268 0 2,268 0 3,497 3,465 3,497 0
SECURITY COSTS 55 0 55 0 55 0 55 1 5 50
GROUND MAINTENANCE 4,465 0 4,210 0 4,411 54 4,263 3,944 4,188 75
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 0 0 10 (10) 0 12 10 (10)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 43,529 0 43,529 0 43,631 (102) 46,527 27,980 46,333 194
LIFE CYCLE MAINTENANCE 0 0 0 0 166 (166) 0 149 194 (194)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 877 0 877 0 609 268 901 648 941 (40)
HOUSING - RENT FREE ACCOMMODATION 266 0 266 0 247 19 266 110 210 56
HOUSING - RENT W/O UNLET PERIODS 2,950 0 2,950 0 2,950 0 2,937 2,004 2,708 229
HOUSING - RENT W/O BAD PERIODS 2,273 0 2,273 0 2,273 0 1,250 702 1,250 0
ASBESTOS 139 0 139 0 139 0 143 70 143 0
FIXED ELECTRICAL 0 0 0 0 1 (1) 0 3 3 (3)
EPC 0 0 0 0 (1) 1 0 0 1 (1)
ELECTRICITY  - CONTRACT 1,350 0 1,350 0 1,350 0 1,350 522 1,324 26
ELECTRICITY  - NON CONTRACT 0 0 0 0 0 0 0 13 18 (18)
GAS 438 0 438 0 438 0 438 279 420 18
HEATING OIL 54 0 54 0 54 0 54 19 14 40
SOLID FUEL 4 0 4 0 4 0 4 7 6 (2)
FIXTURE & FITTINGS 53 0 53 0 0 0 53 84 119 (66)
JANITOR SERVICE 43 0 43 0 0 0 43 30 30 13
CLEANING CONTRACT 385 0 385 0 491 (106) 385 493 492 (107)
CLEANING MATERIALS 57 0 57 0 57 0 57 19 21 36
HEALTH & HYGIENE MATERIALS 0 0 0 0 1 (1) 0 1 0 0
WINDOW CLEANING 16 0 16 0 16 0 16 16 19 (3)
PEST CONTROL 122 0 122 0 176 (54) 122 140 192 (70)
REFUSE UPLIFT 12 (12) 0 0 15 (15) 0 26 24 (24)
REMOVAL & STORAGE COSTS 14 0 14 0 14 0 14 20 23 (9)
OTHER PROPERTY COSTS 32 0 32 0 32 0 32 16 18 14
PROPERTY COSTS 59,597 (12) 59,330 0 59,609 (120) 62,592 40,885 62,420 172
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 295 0 295 0 295 0 295 26 281 14
COMPUTER EQUIPMENT RENTAL 0 0 0 0 0 0 0 0 11 (11)
I.T. EQUIPMENT MAINT-CONTRACT 74 0 74 0 74 0 74 1 116 (42)
EQUIPMENT, APPARATUS AND TOOLS 22 (9) 22 (9) 22 (9) 13 26 38 (25)
ADAPTATIONS FOR CLIENTS 1,890 0 1,890 0 1,890 0 0 0 0 0
FURNITURE - OFFICE 10 0 10 0 10 0 10 3 5 5
MATERIALS 0 0 0 0 0 0 0 0 32 (32)
MATERIALS, APPARATUS AND EQUIPMENT 0 0 0 0 1 (1) 0 1 2 (2)
PROVISIONS 2 0 2 0 2 0 2 5 4 (2)
FOOD PURCHASES 0 0 0 0 0 0 0 0 1 (1)
BEVERAGES 4 0 4 0 4 0 4 0 4 0
PROTECTIVE CLOTHING & UNIFORMS 12 0 12 0 12 0 12 9 10 2
LAUNDRY COSTS 17 (1) 17 (1) 33 (17) 16 30 28 (12)
OTHER SUPPLIES AND SERVICES 38 0 38 0 38 0 38 8 10 28
HEALTH AND SAFETY 15 0 15 0 15 0 15 0 0 15
CATERING - CONTRACT 0 0 0 0 1 (1) 0 1 1 (1)
CATERING - OUTWITH CONTRACT 0 0 0 0 1 (1) 0 1 1 (1)
OUTSOURCED MAIL 3 (3) 3 (3) 4 (4) 0 6 7 (7)
SUPPLIES AND SERVICES 2,382 (13) 2,382 (13) 2,402 (33) 479 117 551 (72)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 1 (1) 0 2 3 (3)
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 3 4 (4)
POOL CAR RECHARGE - RENTAL CHARGE 26 0 26 0 26 0 26 3 4 22
POOL CAR RECHARGE - FUEL 6 0 6 0 6 0 6 0 0 6
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0 1 0 1 0 0 1
OTHER TRANSPORT COSTS 0 0 0 0 1 (1) 0 1 10 (10)
FLEET SERVICE CHARGES 158 0 158 0 158 0 158 100 191 (33)
HIRE OF SKIPS 0 0 0 0 0 0 0 1 0 0
STORAGE 4 0 4 0 4 0 4 0 1 3
TRANSPORT AND PLANT 195 0 195 0 197 (2) 195 110 213 (18)
103

Page 104

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Housing and Revenue Account Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 79 0 79 0 79 0 79 59 74 5
BULK PRINTING 68 0 68 0 68 0 68 0 59 9
TELEPHONES 95 0 95 0 95 0 95 57 67 28
MOBILE PHONES 34 0 34 0 34 0 34 3 56 (22)
ADVERTISING - RECRUITMENT 0 0 0 0 0 0 0 0 3 (3)
ADVERTISING - OTHER 12 0 12 0 12 0 12 0 1 11
POSTAGES/COURIERS 171 0 171 0 171 0 171 90 114 57
SMS MESSAGING 0 0 0 0 3 (3) 0 3 5 (5)
MEMBERSHIP FEES/SUBSCRIPTIONS 38 0 38 0 38 0 38 25 45 (7)
MEDICAL COSTS 25 0 25 0 25 0 25 11 13 12
LEGAL EXPENSES 61 (55) 38 (32) 44 (38) 16 56 16 0
PETTY OUTLAYS 4 0 4 0 4 0 4 0 0 4
HOSPITALITY / CIVIC RECOGNITION 0 0 0 0 1 (1) 0 3 5 (5)
GIRO BANK AGENCY FEES 4 0 4 0 4 0 4 0 4 0
PAYPOINT AGENCY FEES 13 0 13 0 32 (19) 13 22 31 (18)
INTERNET AGENCY FEES 3 0 3 0 3 0 3 0 3 0
OTHER ADMIN COSTS 15 0 15 0 15 0 15 14 20 (5)
CONFERENCES - OFFICIALS 7 0 7 0 7 0 7 0 1 6
INTERNAL SUPPORT SERVICES ALLOCATION 5,020 0 5,020 0 5,020 0 5,020 0 5,020 0
ADMINISTRATION 5,649 (55) 5,626 (32) 5,655 (61) 5,604 343 5,537 67
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 3,055 0 3,055 0 3,055 0 2,785 1,503 2,778 7
OTHER LOCAL AUTHORITIES 0 0 0 0 1 (1) 0 2 3 (3)
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 3 0 3 0 3 0 0 3
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 0 31 0 31 0 31 5 6 25
PAYMENTS TO OTHER BODIES 84 (52) 45 (13) 47 (15) 302 429 725 (423)
PRIVATE INDIVIDUALS - GENERAL 150 0 150 0 150 0 150 0 150 0
PAYMENT TO OTHER BODIES 3,323 (52) 3,284 (13) 3,287 (16) 3,271 1,939 3,662 (391)
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 0 0 0 148 0 0
PAYMENT TO PRIVATE CONTRACTOR 80 0 80 0 116 (36) 80 23 80 0
PAYMENT TO EXTERNAL CONSULTANTS 20 0 20 0 20 0 20 129 20 0
PAYMENT TO CONTRACTORS 100 0 100 0 136 (36) 100 300 100 0
FINANCING CHARGES
INTEREST-DEBT CHARGES 16,620 0 16,620 0 16,620 0 14,594 0 14,594 0
I.T. EQUIPMENT LEASING-CONTRACT 67 0 67 0 67 0 67 6 98 (31)
CFCR 35,633 0 35,633 0 35,633 0 35,633 23,824 35,633 0
INTEREST ON REVENUE BALANCES (825) 0 (825) 0 (825) 0 0 0 0 0
FINANCING CHARGES 51,495 0 51,495 0 51,495 0 50,294 23,830 50,325 (31)
TOTAL EXPENDITURE 137,912 57 137,620 89 138,000 (36) 137,895 78,679 138,103 (208)
INCOME
CONTRIBUTIONS FROM OTHER BODIES 0 0 0 0 0 0 0 (8) 0 0
SALES - DEPARTMENTS OF THE AUTHORITY (1,169) 0 (1,169) 0 (1,169) 0 (885) (681) (885) 0
FEES AND CHARGES - GENERAL (5,579) 0 (5,579) 0 (5,579) 0 (5,607) (3,642) (5,469) (138)
RENTAL INCOME (993) 0 (993) 0 (993) 0 (465) 0 (461) (4)
HOUSE RENTS (120,756) 0 (120,496) 0 (120,751) 0 (121,449) (86,078) (121,547) 98
LOCK UP RENTS (2,980) 0 (2,980) 0 (2,980) 0 (2,911) (2,152) (2,870) (41)
INSURANCE RECOVERIES (539) 0 (539) 0 (539) 0 (520) (164) (520) 0
OTHER INCOME (1,235) 0 (1,235) 0 (1,235) 0 (1,265) (920) (1,265) 0
REALLOCATION OF SUPPORT COSTS (717) 0 (717) 0 (717) 0 (717) 0 (723) 6
YEAR END T/FER TO BALANCE SHEET (3,944) (57) (3,912) (89) (4,037) 36 (4,076) 0 (4,363) 287
INCOME (137,912) (57) (137,620) (89) (138,000) 36 (137,895) (93,645) (138,103) 208
NET EXPENDITURE 0 0 0 0 0 0 0 (14,966) 0 0
104

Page 105

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 29 December 2025 (No.10)
Social Work Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Performance and Support Services 6.187 5.899 0.288 4.65% 4.134
Children and Families 52.841 50.736 2.105 3.98% 37.585
Adults and Older People 192.159 190.909 1.250 0.65% 141.826
Justice and Substance Misuse 0.881 0.179 0.702 79.68% 0.271
Total Social Work Resources 252.068 247.723 4.345 1.72% 183.816
5
105

Page 106

Social Work Resources Variance Analysis 2025/26 (Period 10) 
Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs  4,100k under Admin & Clerical Staff – 470k under 
Basic Grade Social Workers – 2,373k
under 
Managerial Support Specialist Staff -
(217k) over
Adult and Older People –
136k under 
Performance and
Support – 209k under 
Justice – 105k under 
Children and Family -
875k under 
Adult and Older People –
1,231k under 
Justice - 246k under 
Children and Family -
778k under 
This relates to the underspends
to Scheduling Assistant
vacancies in Homecare, which
are being recruited. This is offset
by overtime costs for Managerial
Support Specialist Staff (below).   
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of new posts
approved at committee which are
actively being recruited to. This
results in an in-year underspend. 
This is a result of vacancies
which are actively being
106

Page 107

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.)   
Care Staff – 501k under 
Instructors - 63k under 
Adult and Older People –
(1,429k) over 
Performance and
Support – 125k under 
Justice - 339k under 
Children & Family –
(96k) over 
Adult & Older People -
597k under 
Adult & Older People –
63k under 
recruited. 
This overspend is a result of
turnover being less than
anticipated to date, and overtime
spend to cover the Scheduling
Assistant vacancies in Homecare 
This is a result of vacancies
which are actively being
recruited. 
This is a result of new posts
approved at committee which are
actively being recruited to. This
results in an in-year underspend. 
This overspend is due to the level
of overtime being incurred to
manage staff absences due to
sickness and maternity leave. 
This is a result of vacancies
which are actively being
recruited. 
This underspend relates to
vacancies within day care
services. 
107

Page 108

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Manual Workers (Home Carers) – 517k
under 
Other Employee Costs - 385k under
Adult and Older People – 
517k under 
Children & Family – 385k
under 
This is a result of vacancies
which are actively being
recruited. 
This is a funding solution
identified as part of the overall
budget recovery plan.
Property Costs  (102k) over Rates – (117k) over 
Scottish Water – Metered Charges -
(40k) over 
Rent - (40k) over 
Repairs and Maintenance internal-
(37k) over 
Adult and Older People –
(110k) over 
Adult and Older People –
(22k) over 
Children & Family –
(14k) over 
Adult and Older People –
(37k) over 
Adult and Older People –
(26k) over 
Additional rates for closed
centers that previously had 100%
relief. 
This overspend is the result of
increased prices. 
This overspend is the result of
increased prices. 
This overspend is in respect of
rental charges for residential care
homes.   
This non-recurring overspend is
due to several small higher than
anticipated spends in relation to
repairs and maintenance across
A&OP services. 
108

Page 109

Subjective Head Variance Subjective line Service / amount Explanation
Property Costs
(cont.) 
Electricity - 98k under 
Gas – 81k under
Adult and Older People –
96k under 
Adult and Older People –
74k under
The underspend reflects a
reduction in price. 
The underspend reflects a
reduction in price.
Supplies and
Services 
290k under Computer Equipment Purchase – 
(75k) over 
Aids for Clients – 201k under 
Supplies for Clients – 76k under 
Food Purchases within Contract –
46k under 
Performance and
Support – (29k) over 
Adult and Older People –
(33k) over 
Adult and Older People –
203k under 
Children & Family – 53k
under 
Adult and Older People –
47k under 
The overspend is non-recurring
due to the purchase of additional
office equipment required. 
The overspend is due to non-
recurring spend to replenish IT
equipment within Homecare
service. 
The underspend reflects the
requirement to purchase and
replace existing assistive
technology equipment which is
used to support service users to
remain at home. 
The spend on supplies can be
ad-hoc in nature and is currently
showing an underspend. 
The underspend is a
consequence of residential care
homes currently not running to
capacity throughout the year. 
109

Page 110

Subjective Head Variance Subjective line Service / amount Explanation
Transport and
Plant 
(92k) over Fleet Service Charges – (50k) over 
Other Transport Costs – 81k under 
Pool Car Recharge - Rental – (132k)
over 
Adult and Older People –
(62k) over 
Adult and Older People –
84k under 
Children and Family –
(152k) over
The overspend relates to
slippage in the 2024/25 saving for
the decommissioning of Fleet
buses that are no longer
required. An action plan is being
developed to ensure costs are
reduced to achieve the saving in
full. Alongside an overspend in
Homecare due to aging vehicles. 
The underspend reflects the
current demand for external
service. 
The overspend reflects the
demand and arrangements for
pool cars. 
Administration (370k) over Mobile Phones – (382k) over Adult and Older People -
(263k) over 
Children and Family –
(64k) over 
The overspend relates to cost of
mobile phones reflecting service
delivery. 
The overspend relates to cost of
mobile phones reflecting service
delivery. 
Payment to Other
Bodies 
(511k) over  Payment to Other Bodies - 88k under  Children & Family - 54k
under 
This is a funding solution
identified as part of the overall
budget recovery plan. 
110

Page 111

Subjective Head Variance Subjective line Service / amount Explanation
Payment to Other
Bodies (cont.)    
Payment to Private Individuals – 189k
under 
Social Work – Foster Parents – (343k)
over 
Social Work – Adoption Allowance –
(395k) over 
Social Work - Direct Payments - (92k)
over
Adult and Older People -
43k under 
Children & Family - 195k
under 
Children and Family –
(343k) over 
Children and Family –
(395k) over 
Adult and Older People –
(67k) over 
The underspend has arisen from
services which are no longer
being commissioned. 
There has been a reduction in the
number of supported carers and
use of the shared care scheme.
However, work has been
undertaken to attract new carers
in these areas. 
This recurring overspend is
attributable to the requirement to
purchase external foster
placements. 
This overspend relates to the
number of adoptive carers being
paid an ongoing adoption
allowance. It also relates to
interagency adoption payments
where carers have been
identified out with South
Lanarkshire. 
The overspend reflects current
demand for Direct Payments. 
111

Page 112

Subjective Head Variance Subjective line Service / amount Explanation
Payment to
Contractors 
950k under Payment to Private Contractors-
Payments to Col Orgs-Care Element –
538k under 
Payment to Private Contractors – CET
allocation – Home Care - (272k) over 
Payment to Private Contractors –
Secure Accommodation - 512k under 
Payment to Private Contractors –
Respite – 100k under 
Payment to Private Contractors –
Daycare – (225k) over 
Payment to Private Contractors – 
Home Support - 288k under
Children and Family – 
494k under 
Adult and Older People –
(252k) over 
Children and Family – 
512k under 
Adult and Older People –
100k under 
Adult and Older People –
(225k) over 
Adult and Older People –
288k under 
This underspend represents a
temporary funding solution as
part of the overall budget
recovery plan. 
The overspend reflects current
demand for the external home
care service. 
This underspend reflects the
current demand for Council
funded secure placements which
have reduced in 2025/26. 
This overspend relates to the
demand for community-based
respite. 
This overspend reflects the
current demand for this day
opportunity services. 
This underspend reflects lower
demand for external home
support service. 
112

Page 113

Subjective Head Variance Subjective line Service / amount Explanation
Transfer
Payments 
(472k) over Direct Assistance to Persons – (451k)
over 
Children and Family –
(434k) over
This overspend is due to budget
pressure continuing into 2025/26,
an increase in demand for kinship
care allowances and an increase
to the net cost to the Council
arising from the migration to
Universal Credit which has
resulted in the loss of child tax
credits from some kinship carers.
Income  580k over
recovered
Fees and Charges – General – 212k
over recovered 
Other Income – 68k over recovered 
Contributions from Other Bodies – 194k
over recovered 
Children and Family –
45k over recovered 
Adult and Older People –
167k over recovered 
Adult and Older People –
81k over recovered 
Children and Family –
164k over recovered 
This is due to the recovery of
unused direct payments. This
over recovery if offsetting small
overspends in the current year’s
Direct Payments and community
outreach services within Children
and Family. 
This over recovery relates to non-
recurring income received in
respect of recovery of prior year
care costs from service users. 
This over recovery of income
relates to non-recurring
reimbursement of costs. 
This over recovery is due to the
level of Unaccompanied Asylum-
Seeking Children (UASC) income
being received for children
113

Page 114

* The underlined variances represent new variances since the last report. 
Subjective Head Variance Subjective line Service / amount Explanation
Income (cont.)  
Fees and Charges - Other Local – 53k
over recovered 
Children and Family –
78k over recovered
seeking asylum. 
This over recovery is due to a
recharge to other local authorities
for interagency adoption fees. 
114

Page 115

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Social Work Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT&C BASIC 6,128 239 6,362 425 6,373 417 6,815 4,098 6,286 529
APT&C OVERTIME 60 (60) 86 (86) 152 (152) 0 127 165 (165)
APT&C SUPERANNUATION 397 23 411 37 392 54 445 261 371 74
APT&C NIC 680 3 759 (27) 689 43 711 489 679 32
SOCIAL WORKERS BASIC GRADE BASIC 13,927 1,105 14,005 1,029 13,825 1,112 15,091 9,597 13,072 2,019
SOCIAL WORKERS BASIC GRADE OVERTIME 102 (30) 92 (20) 91 (19) 62 59 98 (36)
SOCIAL WORKERS BASIC GRADE SUPERANNUATION 918 122 933 107 914 115 1,030 605 853 177
SOCIAL WORKERS BASIC GRADE NIC 1,845 144 1,834 155 1,833 143 1,983 1,271 1,770 213
MAN/SPEC/FWORK BASIC 25,587 (119) 26,110 (376) 26,288 (454) 26,346 18,851 26,371 (25)
MAN/SPEC/FWORK OVERTIME 293 (247) 263 (217) 221 (175) 46 382 520 (474)
MAN/SPEC/FWORK SUPERANNUATION 1,640 65 1,669 41 1,673 49 1,722 1,176 1,670 52
MAN/SPEC/FWORK NIC 3,934 (60) 3,861 (51) 3,909 (83) 3,704 2,521 3,474 230
CARE STAFF BASIC 17,417 269 17,391 355 17,297 449 17,573 11,913 16,820 753
CARE STAFF OVERTIME 805 (300) 801 (359) 919 (477) 500 664 958 (458)
CARE STAFF SUPERANNUATION 1,086 45 1,083 52 1,060 75 1,135 736 1,006 129
CARE STAFF NIC 2,144 (4) 2,229 (8) 2,190 31 2,222 1,560 2,145 77
INSTRUCTORS - SOCIAL WORK BASIC 1,604 31 1,598 37 1,582 53 1,635 1,116 1,577 58
INSTRUCTORS - SOCIAL WORK SUPERANNUATION 103 3 100 6 103 3 106 72 103 3
INSTRUCTORS - SOCIAL WORK NIC 193 4 189 8 195 2 197 138 195 2
MANUAL WORKERS BASIC 30,629 271 29,994 323 29,989 323 30,199 21,069 29,629 570
MANUAL WORKERS OVERTIME 1,250 (15) 1,257 (22) 1,311 (76) 1,370 1,304 1,664 (294)
MANUAL WORKERS SUPERANNUATION 1,948 74 1,911 73 1,922 62 1,984 1,318 1,847 137
MANUAL WORKERS NIC 4,003 0 3,927 0 3,904 19 3,923 2,820 3,819 104
TRAVEL AND SUBSISTANCE 340 57 372 25 375 22 397 202 380 17
OTHER EMPLOYEE COSTS 1,179 0 1,207 1 908 300 1,116 190 731 385
PENSION INCREASES 332 (4) 332 (4) 328 0 328 205 332 (4)
STRAIN ON THE FUND 7 (7) 5 (5) 5 (5) 0 12 5 (5)
EMPLOYEE COSTS 118,551 1,609 118,781 1,499 118,448 1,831 120,640 82,756 116,540 4,100
PROPERTY COSTS
RATES 360 0 364 0 357 7 362 458 479 (117)
SCOTTISH AKATER - UNMETERED CHARGES 1 0 1 0 1 0 1 0 1 0
SCOTTISH WATER - METERED CHARGES 175 0 175 0 177 (2) 177 154 217 (40)
RENT 554 (6) 553 (11) 555 (13) 547 497 587 (40)
PROPERTY INSURANCE 292 0 292 0 292 0 292 287 293 (1)
SECURITY COSTS 2 0 2 0 2 0 2 5 2 0
GROUND MAINTENANCE 0 0 0 0 0 0 12 12 12 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 14 (12) 11 (9) 24 (10) 36 78 73 (37)
LIFE CYCLE MAINTENANCE 0 0 0 0 0 0 0 1 1 (1)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 26 0 26 0 36 (10) 28 26 29 (1)
ELECTRICAL HEATING MAINTENANCE 0 0 0 0 0 0 0 5 0 0
ELECTRICITY  - CONTRACT 707 0 707 0 707 0 662 116 564 98
ELECTRICITY - NON CONTRACT 0 0 0 0 0 0 0 4 0 0
GAS 471 0 471 0 471 0 486 210 405 81
FIXTURE & FITTINGS 10 0 14 (4) 37 (27) 32 46 45 (13)
JANITOR SERVICE 0 0 1 (1) 1 (1) 0 0 0 0
CLEANING CONTRACT 380 0 382 0 393 0 388 372 379 9
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 119 0 118 0 118 0 118 99 132 (14)
HEALTH & HYGIENE MATERIALS 86 0 86 0 86 0 86 69 87 (1)
AKINDOAK CLEANING 9 0 9 0 9 0 9 5 9 0
REFUSE UPLIFT 39 0 39 0 39 0 39 27 41 (2)
REMOVAL & STORAGE COSTS 1 0 1 0 1 0 2 8 7 (5)
OTHER PROPERTY COSTS 167 (5) 157 0 142 (7) 157 68 175 (18)
PROPERTY COSTS 3,413 (23) 3,409 (25) 3,448 (63) 3,436 2,547 3,538 (102)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 818 (13) 829 (24) 943 (131) 930 986 1,005 (75)
COMPUTER EQUIPMENT MAINTENANCE 34 0 38 (4) 27 0 27 9 11 16
I.T. EQUIPMENT MAINT-CONTRACT 192 0 192 0 179 0 176 14 183 (7)
I.T. ELECTRONIC MESSAGING 97 0 97 0 97 0 97 0 121 (24)
EQUIPMENT, APPARATUS AND TOOLS 122 (8) 122 (8) 123 (9) 110 79 112 (2)
SMALL TOOLS 4 0 4 0 4 0 4 5 10 (6)
AIDS FOR CLIENTS 980 0 979 1 979 1 860 353 659 201
ADAPTATIONS FOR CLIENTS 972 0 972 0 981 0 873 450 827 46
SUPPLIES FOR CLIENTS 350 0 345 0 313 36 352 197 276 76
FURNITURE - OFFICE 3 (2) 2 (1) 2 (1) 1 11 12 (11)
FURNITURE - GENERAL 34 (34) 34 (34) 0 0 34 38 41 (7)
FURNISHINGS (INCL. CROCKERY & LINEN) 15 0 15 0 15 0 19 17 24 (5)
MATERIALS 10 0 10 0 10 0 10 (4) 2 8
MATERIALS, APPARATUS AND EQUIPMENT 2 0 3 (1) 5 (3) 2 11 12 (10)
TV LICENCES - EDUCATION 0 0 0 0 0 0 0 0 4 (4)
PROVISIONS 219 (2) 222 0 225 (3) 221 173 222 (1)
FOOD PURCHASES 437 0 437 0 437 0 452 288 406 46
FOOD PURCHASES OUTWITH CONTRACT 0 0 0 0 0 0 0 0 2 (2)
BEVERAGES 50 0 50 0 50 0 50 30 42 8
SCHOOL MILK 34 0 34 0 34 0 34 23 33 1
PROTECTIVE CLOTHING & UNIFORMS 1,247 0 1,247 0 1,247 0 1,457 938 1,416 41
LAUNDRY COSTS 2 1 2 1 2 1 3 6 6 (3)
OTHER SUPPLIES AND SERVICES 46 0 40 (2) 41 (3) 38 21 35 3
CATERING - CONTRACT 367 0 367 0 387 (20) 367 349 367 0
CATERING - OUTWITH CONTRACT 31 0 31 0 31 0 21 13 14 7
ARTIST FEES/ PERFORMING ARTS 0 0 0 0 0 0 0 3 2 (2)
OUTSOURCED MAIL 0 0 0 0 1 (1) 0 1 2 (2)
DELIVERY CHARGE 0 0 0 0 0 0 0 4 2 (2)
SUPPLIES AND SERVICES 6,066 (58) 6,072 (72) 6,133 (133) 6,138 4,015 5,848 290
115

Page 116

South Lanarkshire Council
Period 5 Period 5 Period 6 Period 6 Period 7 Period 7 Revised Period 10 Period 10 Period 10
Social Work Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 1 1 (1)
POOL CAR CHARGES-RENTAL 268 (100) 269 (100) 277 (108) 169 101 301 (132)
POOL CAR CHARGES-FUEL 16 0 15 0 10 5 15 0 0 15
POOL CAR CHARGES-ADDITIONAL COSTS 4 (1) 5 (2) 4 (1) 3 2 3 0
OTHER TRANSPORT COSTS 807 0 807 0 807 0 801 303 720 81
INSURANCE 24 0 24 0 24 0 24 21 24 0
FLEET SERVICE CHARGES 3,404 (121) 3,401 (118) 3,407 (124) 3,283 3,139 3,333 (50)
HIRE OF EXTERNAL VEHICLES 7 0 7 0 7 0 7 2 1 6
HIRE OF SKIPS 0 0 0 0 0 0 0 2 2 (2)
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 6 5 (5)
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 0 0 0 0 0 0 0 3 3 (3)
PUPIL TRANSPORT - OTHER 10 0 10 0 10 0 10 7 11 (1)
TRANSPORT AND PLANT 4,540 (222) 4,538 (220) 4,546 (228) 4,312 3,587 4,404 (92)
ADMINISTRATION
PRINTING AND STATIONERY 94 (3) 98 (7) 112 (21) 82 72 97 (15)
TELEPHONES 205 (5) 200 0 210 (10) 200 58 172 28
MOBILE PHONES 282 0 282 0 282 0 282 2 664 (382)
ADVERTISING - RECRUITMENT 4 0 4 0 4 0 4 0 4 0
ADVERTISING - OTHER 10 0 10 0 10 0 10 1 1 9
POSTAGES/COURIERS 54 0 54 0 54 0 54 37 46 8
SMS MESSAGING 2 0 2 0 2 0 2 0 2 0
MEMBERSHIP FEES/SUBSCRIPTIONS 87 (5) 73 (11) 73 (9) 74 60 82 (8)
INSURANCE 27 0 27 0 27 0 27 27 27 0
MEDICAL COSTS 41 (13) 41 (7) 44 (10) 34 51 76 (42)
LEGAL EXPENSES 507 (50) 507 (50) 509 (52) 542 427 531 11
PETTY OUTLAYS 0 0 0 0 0 0 0 1 1 (1)
HOSPITALITY / CIVIC RECOGNITION 2 0 2 0 2 0 2 2 5 (3)
PAYPOINT AGENCY FEES 0 0 0 0 0 0 0 3 4 (4)
OTHER ADMIN COSTS 21 0 15 0 15 0 15 6 8 7
CONFERENCES - OFFICIALS (incl associated costs) 7 0 15 0 15 0 15 4 12 3
TRAINING 56 0 59 0 60 (1) 59 26 40 19
INTERNAL SUPPORT SERVICES ALLOWANCES 410 0 410 0 410 0 410 0 410 0
ADMINISTRATION 1,809 (76) 1,799 (75) 1,829 (103) 1,812 777 2,182 (370)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 165 0 165 0 165 0 185 0 185 0
OTHER LOCAL AUTHORITIES 25 0 25 0 25 0 25 0 25 0
GRANTS TO VOLUNTARY ORGANISATIONS 23 0 23 0 23 0 23 17 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 1,733 0 1,727 0 1,641 86 1,817 1,279 1,775 42
PAYMENTS TO OTHER BODIES 2,040 0 2,354 0 1,901 0 1,527 925 1,439 88
PAYMENTS TO HEALTH BOARD 1,508 0 1,508 0 1,508 0 1,471 104 1,471 0
PRIVATE INDIVIDUALS - GENERAL 710 0 715 0 531 180 775 315 586 189
SOCIAL WORK - FOSTER PARENTS 6,770 (200) 6,770 (200) 6,994 (424) 6,570 5,404 6,913 (343)
SOCIAL WORK - FOSTER PARENTS D 94 0 94 0 94 0 94 52 94 0
SOCIAL WORK - ADOPTION ALLOWANCES 750 (100) 750 (100) 936 (286) 650 946 1,045 (395)
DIRECT PAYMENTS 11,261 0 11,261 0 11,301 (40) 11,244 8,435 11,336 (92)
PAYMENT TO OTHER BODIES 25,079 (300) 25,392 (300) 25,119 (484) 24,381 17,477 24,892 (511)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 156,448 (408) 156,514 (473) 156,924 (430) 155,541 100,980 154,603 938
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 117 0 137 0 153 (14) 139 101 127 12
PAYMENT TO CONTRACTORS 156,565 (408) 156,651 (473) 157,077 (444) 155,680 101,081 154,730 950
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 4,710 (360) 4,705 (360) 4,861 (516) 4,345 3,942 4,796 (451)
SECTION PAYMENTS 30 0 30 0 38 (8) 30 42 51 (21)
TRANSFER PAYMENTS 4,740 (360) 4,735 (360) 4,899 (524) 4,375 3,984 4,847 (472)
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL (1) 0 (1) 0 (1) 0 (1) 0 1 (2)
I.T. EQUIPMENT LEASING - CONTRACT 395 0 395 0 395 0 398 29 424 (26)
FINANCING CHARGES 394 0 394 0 394 0 397 29 425 (28)
TOTAL EXPENDITURE 321,157 162 321,771 (26) 321,893 (148) 321,171 216,253 317,406 3,765
INCOME
NON RELEVANT GOVERNMENT GRANT (8,811) 0 (8,838) 0 (8,838) 0 (8,810) (5,764) (8,810) 0
RESOURCE TRANSFER INCOME FROM (25,786) 0 (25,786) 0 (25,786) 0 (25,786) (19,340) (25,786) 0
CONTRIBUTIONS FROM OTHER BODIES (801) 10 (791) 0 (791) 0 (829) (518) (1,023) 194
SALES - SALE OF MEALS (29) 15 (30) 16 (31) 17 (29) (41) (41) 12
FEES AND CHARGES - GENERAL (6,465) (187) (6,662) 10 (6,739) 87 (6,704) (6,191) (6,916) 212
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (443) 0 (443) 0 (443) 0 (443) (122) (496) 53
CHARGES TO HEALTH BOARDS (26,252) 0 (26,345) 0 (26,345) 0 (25,704) (235) (25,723) 19
FEES AND CHARGES - DEPARTMENTS (218) 0 (218) 0 (218) 0 (218) (34) (222) 4
RENTAL INCOME (45) 0 (45) 0 (45) 0 (45) (39) (53) 8
OTHER INCOME (135) 0 (135) 0 (179) 44 (135) (153) (203) 68
ACCOMMODATION INCOME FROM USERS (400) 0 (400) 0 (400) 0 (400) 0 (410) 10
INCOME (69,385) (162) (69,693) 26 (69,815) 148 (69,103) (32,437) (69,683) 580
NET EXPENDITURE 251,772 0 252,078 0 252,078 0 252,068 183,816 247,723 4,345
116