Democracy Spraffa

Agenda Document Pack - Financial Resources Scrutiny Forum - 20/03/2025

South Lanarkshire Council · 20 March 2025
Back to Financial Resources Scrutiny Forum — 20 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 12 March 2025 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 20 March 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Grant Ferguson (Chair), Julia Marrs (Depute Chair), Mathew Buchanan, Colin Dewar, Monique
Equi, Ross Gowland, Gavin Keatt, Richard Lockhart, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Financial Resources Scrutiny Forum held on 20
February 2025 submitted for approval as a correct record. (Copy attached) 
3 - 8 
Item(s) for Consideration 
3a  Capital Budget Monitoring 2024/2025 - General Fund Capital Programme
Report dated 4 March 2025 by the Executive Director (Finance and Corporate
Resources). (Copy attached) 
9 - 28 
3b  Capital Budget Monitoring 2024/2025 - Housing Capital Programme
Report dated 4 March 2025 by the Executive Director (Finance and Corporate
Resources). (Copy attached) 
29 - 34 
4 Revenue Budget Monitoring 2024/2025
Report dated 3 March 2025 by the Executive Director (Finance and Corporate
Resources). (Copy attached) 
35 - 40 
5 Revenue Budget Monitoring 2024/2025 - Detailed Resource Analysis
Report dated 3 March 2025 by the Executive Director (Finance and Corporate
Resources). (Copy attached) 
41 - 104 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

FINANCIAL RESOURCES SCRUTINY FORUM 
Minutes of meeting held via Confero/MS Teams and in Committee Room 1, Council Offices, Almada
Street, Hamilton on 20 February 2025 
Chair:
Councillor Grant Ferguson 
Councillors Present:
Councillor Colin Dewar, Councillor Monique Equi, Councillor Ross Gowland, Councillor Richard
Lockhart, Councillor Julia Marrs (Depute), Councillor Carol Nugent 
Councillors' Apologies:
Councillor Mathew Buchanan, Councillor Gavin Keatt 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); B Hall, Administration Officer; E-A McGonigle, Administration
Adviser; A Norris, Administration Assistant; L O’Hagan, Head of Finance (Strategy)
Housing and Technical Resources
D Craig, Property Manager (Commercial); A Roxburgh, Performance and Standards Manager 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Financial Resources Scrutiny Forum held on 19 December
2024 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3a Capital Budget Monitoring 2024/2025 – General Fund Capital Programme 
A report dated 3 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the General Fund Capital Programme 2024/2025 for the period
1 April to 30 December 2024. 
The revised General Fund Capital Programme for 2024/2025 totalled £69.832 million, as
detailed in Appendix B to the report.  The revised programme included adjustments totalling a
net decrease of £6.960 million, as approved at the Executive Committee on 11 December 2024
and detailed in Appendix A to the report.   
The programme spend and funding available to support the General Fund Capital Programme
was detailed in Appendix D to the report.  The forecast spend for the financial year was currently
£59.024 million.  The underspend reflected the timing of spend across the year and into the new
financial year and resulted in budget required in 2025/2026 rather than 2024/2025.  Funding for
projects that remained underspent at the financial year end would be carried forward to allow the
projects to be completed in 2025/2026.  As at 30 December 2024, work continued to clarify the
predicted spend position for the General Services Capital Programme and officers continued to
work to maximise spend in 2024/2025. 
2
3

Page 4

Actual spend incurred to 30 December 2024 totalled £33.568 million.  This would leave
expenditure of £25.456 million still to be incurred up to the end of the financial year and was
related to the timing of expenditure on several high value projects, as detailed in paragraph 4.5
of the report. 
Actual funding received to 30 December 2024 was £52.509 million, as detailed in Appendix D to
the report.  The funding for the year included an additional allocation for Tier 2 Active Travel
Infrastructure of £0.272 million which would be used for Hairmyres Transport Interchange –
Active Travel Network, as detailed in paragraph 4.6 of the report.  Relevant officers would
continue to closely monitor the generation of all income, including receipts. 
The physical progress achieved with the General Fund Capital Programme 2024/2025 at 30
December 2024 was detailed in appendices D to F to the report. 
The Forum decided: that the position on the General Fund Capital Programme
as at 30 December 2024 be noted. 
[Reference: Minutes of 19 December 2024 (Paragraph 3a) and Minutes of the Executive
Committee of 11 December 2024 (Paragraph 4)] 
3b Capital Budget Monitoring 2024/2025 – Housing Capital Programme 
A report dated 3 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the Housing Capital Programme 2024/2025 for the period 1
April to 30 December 2024 (Period 10). 
The revised Housing Capital Programme for 2024/2025 totalled £77.248 million, as approved by
the Executive Committee on 11 December 2024.  Programmed funding for the year also totalled
£77.248 million.  The budget, along with a detailed breakdown of the funding sources, was
included in Appendix A to the report. 
The predicted outturn position for the Housing Capital Programme for the financial year
2024/2025 was £73.112 million.  Details of the forecast underspend of £4.136 million were
provided in paragraph 4.4 of the report. 
Spend to 30 December 2024 on the Housing Capital Programme amounted to £43.425 million. 
As at 30 December 2024, £43.425 million of funding had been received. 
The physical progress achieved with the Housing Capital Programme 2024/2025 at 30
December 2024 was detailed in Appendix B to the report.   
Officers responded to a member’s questions in relation to the impact of the recent storm on the
Housing Capital Programme and the Council’s insurance coverage.   
The Forum decided: that the physical and financial progress of the Housing
Capital Programme as at 30 December 2024 be noted. 
[Reference: Minutes of 19 December 2024 (Paragraph 3b) and Minutes of the Executive
Committee of 11 December 2024 (Paragraph 4)] 
In terms of Standing Order No 14, the Chair adjourned the meeting during this item of business at
2.15pm due to technical issues and reconvened at 2.55pm. Councillor Nugent was not present
when the meeting reconvened and Councillor Equi joined the meeting at this point 
4

Page 5

4 Revenue Budget Monitoring 2024/2025 
A report dated 3 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on the overall financial position of the Council’s General Fund Revenue Account
and Housing Revenue Account for the period 1 April to 30 December 2024 (Period 10), along
with a projection for the year to 31 March 2025.   
The report and associated appendices:- 
 summarised the 2024/2025 probable outturn position for the Council’s General Fund
Revenue Account to 31 March 2025, including details of proposed transfers to reserves
 detailed the various 2024/2025 revenue grant redeterminations included in the Local
Government Finance Settlement 2025/2026
 provided details of the position on the General Fund Account and the Housing Revenue
Account respectively for the period 1 April to 30 December 2024
 detailed anticipated spend for the current year
 proposed funds to be transferred to reserves for future commitments 
 detailed the position, after all proposed transfers to reserves, for known commitments
required in the next financial year
 provided the Housing Revenue Account position 
The outturn position, after transfers to reserves, resulted in an underspend of £13.727 million. 
This included proposed transfers to reserves totalling £4.963 million. 
The position for Adults and Older People within Social Work Resources included a £0.650
million commitment in respect of the element of the budget delegated to the Integration Joint
Board (IJB).  It was proposed that the IJB retain this non-recurring underspend within its
reserves earmarked for future costs.  If approved, those monies would be retained in the
Council’s Balance Sheet and would be available for use by the IJB. 
The report also detailed that:- 
 the anticipated £7.907 million underspend from the Loans Fund Review be transferred to
reserves to support the Budget Strategy, which could include the 2025/2026 Revenue
Budget, as approved by the Executive Committee on 12 February 2025 and detailed in
paragraph 4.18 of the report 
 the £5.820 million underspend in Utilities (£2.000 million), Procurement Savings (£0.520
million) and Council Tax (£3.300 million) be transferred to Reserves to support the Budget
Strategy which could include the 2025/2026 Revenue Budget 
The Local Government Finance Circular 10/2024, published on 12 December 2024, confirmed
previously advised monies for 2024/2025 as well as additional earmarked funding for a number
of Council services.  Details of the new redetermination monies were provided in the report. 
At 30 December 2024, the position on the General Fund Revenue Account, after transfers to
reserves, was an underspend of £13.727 million. 
At 30 December 2024, the Housing Revenue Account showed a breakeven position and the
forecast to 31 March 2025 on the Housing Revenue Account was also a breakeven position. 
The Head of Finance (Strategy) responded to a member’s questions in relation to the proposed
Transfers to Reserves and undertook to provide further information to the appropriate member
upon request. 
The Forum decided: 
(1) that the transfers to reserves, previously approved by the Executive Committee, totalling
£26.890 million, as detailed in paragraph 4.2, be noted; 
5

Page 6

(2) that including Resources, Corporate items and Council Tax, and the proposed Transfer to
Reserves, the Council’s outturn underspend of £13.727 million for 2024/2025, as detailed
in paragraph 4.2, be noted;
(3) that the proposed Transfers to Reserves, totalling £4.963 million, as detailed in paragraph
4.3, be noted;
(4) that the non-recurring underspend of £0.650 million in the delegated budget to the
Integration Joint Board (IJB) to be held in reserves for use in future years, as detailed in
paragraph 4.9, be noted;
(5) that the proposed use of £7.907 million underspend from the Loans Fund Review to be
transferred to Reserves to support the Budget Strategy, which could include the 2025/2026
Revenue Budget, as detailed in paragraph 4.18 (and approved by the Executive
Committee on 12 February 2025), be noted;
(6) that the proposed use of £5.820 million underspend in Utilities (£2.000 million),
Procurement savings (£0.520 million) and Council Tax (£3.300 million) to be transferred to
reserves to support the Budget Strategy which could include the 2025/2026 Revenue
Budget, as detailed in paragraph 4.18, be noted;
(7) that the redeterminations of 2024/2025 revenue grant funding, as included in the Local
Government Finance Circular 10/2024, and detailed in section 6 of the report, be noted;
and
(8) that the projected break-even position on the Housing Revenue Account for 2024/2025, as
detailed in section 7 and Appendix 4, be noted. 
[Reference: Minutes of 19 December 2024 (Paragraph 4) and Minutes of the Executive
Committee of 13 November 2024 (Paragraph 3) and 12 February 2025 (Paragraph
3)] 
Councillor Gowland, having experienced technical issues, joined the meeting during consideration
of the above item of business 
5 Revenue Budget Monitoring 2024/2025 – Detailed Resource Analysis 
A report dated 3 February 2025 by the Executive Director (Finance and Corporate Resources)
was submitted comparing actual expenditure against budgeted expenditure for the period 1 April
to 30 December 2024 (Period 10). 
Appendices A to F to the report provided the following information for each Resource and the
Housing Revenue Account:- 
 an Executive Summary showing the top-level position for each of the Services within the
Resource and the Housing Revenue Account as at 30 December 2024
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services as at 30 December 2024
 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings as at 30 December 2024 
The Finance Manager (Strategy) responded to a member’s questions in relation to the costs
associated with residential placements within other local authorities (Education Resources) and
when those figures had last been analysed.  Where information was not readily available, the
Finance Manager (Strategy) undertook to liaise with the relevant Resources and provide this to
relevant members.   
The Forum decided: that the position as at 30 December 2024 (Period 10) be
noted. 
[Reference:  Minutes of 19 December 2024 (Paragraph 5)]
6

Page 7

6 Urgent Business 
There were no items of urgent business. 
7

Page 8

8

Page 9

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 20 March 2025
Report by: Executive Director (Finance and Corporate Resources)
Subject: Capital Budget Monitoring 2024/2025 - General Fund
Capital Programme
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2024
to 24 January 2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the 2024/2025 General Fund
Capital Programme be noted.
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 24 January 2025 from
both a financial and physical perspective.
3.2. Appendices A to C show the financial position of the General Fund Capital
Programme, with the physical progress detailed in appendices D to F – as they are
split into Build, Non-Build and Roads.
4. General Fund Capital Programme 2024/2025
4.1. 2024/25 Budget:  The revised programme for the General Fund is £69.832 million.
This revised programme consists of the base budget plus carry forward projects and
adjustments which have been agreed by the Executive Committee up to and
including its meeting on 12 March 2025.  
4.2. 2024/2025 Forecast:  The programme spend and funding for the General Fund is
summarised in Appendix D.  As noted in 4.1, the total capital programme for the year
is £69.832 million.  The forecast spend for the current year is currently £59.024
million.
4.3. This forecast underspend reflects the timing of spend across this year and into the
new financial year, and results in budget required in 2025/2026 rather than
2024/2025.  Funding for projects remaining underspent at the financial year end will
be carried forward to allow the projects to be completed in 2025/2026.  As at 24
January 2025, work continues to clarify the predicted spend position for the General
Services Capital Programme for the remainder of this financial year.  Officers will
continue to work to maximise spend in 2024/2025.  
3a
9

Page 10

4.4. 2024/2025 Actual Position:  Actual spend incurred to the 24 January 2025 totals
£36.223 million.
4.5. This leaves expenditure of £22.801 million still to be incurred up to the end of the
financial year and relates to the timing of expenditure on several high value projects
including the Leisure and Culture Transformation Fund, Roads Investment
Programme and Planned Asset Management Programme.  The latest outturn
information indicates that this level of expenditure will be incurred between now and
the financial year end.
4.6. Indicative Funding:  Actual funding received to 24 January 2025 is £49.077 million.
This is shown in Appendix 3.  The funding for the year includes an additional
indicative £1.100m General Capital Grant in relation to Flooding Resilience Funding. 
This will be distributed to the Council in 2024/2025 but will be required to be returned
in a future year when it is required for the remaining national flood protection
schemes from the 2015 Flood Risk Management Plans.  As this funding will be
clawed back from the Council’s allocation at a future year (to be determined), it will
be utilised in 2024/2025 in place of planned borrowing with the displaced funding set
aside for when the General Capital Grant is required to be returned.  There is
therefore no increase in the overall funding package this financial year.
5. Employee Implications
5.1. There are no employee implications as a result of this report.
6. Financial Implications
6.1. The financial implications are included in section 4 of this report.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings.
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report.
Jackie Taylor
Executive Director (Finance and Corporate Resources)
4 March 2025
10

Page 11

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 12 March 2025 
List of Background Papers
 Capital Ledger prints to 24 January 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 455637)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
11

Page 12

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 24 JANUARY 2025 
£m  
Total Base Budget (including carry forward from 2023/2024)  69.832  
Proposed Adjustments – Period 11 0.00 
69.832
Total Revised Budget 
2024/25
Budget 
Period 11
Proposed
Adjustments 
Revised
2024/25
Budget
Resource £m £m £m    
Community & Enterprise 47.364 - 47.364
Education 8.371 - 8.371
Finance & Corporate 3.086 - 3.086
Housing & Technical 9.984 - 9.984
Social Work 1.027 - 1.027    
TOTAL CAPITAL PROGRAMME 69.832 - 69.832         
12

Page 13

APPENDIX B 
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 24 JANUARY 2025 
Resource Name 
Annual
Budget
£000 
2023/24
C/F
£000
Previous
Slippage
/Adjs
£000
Total
Original
Budget
£000 
Proposed
Adjs
£000 
Proposed
Slippage
£000 
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
1,380 1,478 (12) 2,846 252 0 3,098 2,415 683 1,375
Enterprise &  
Sustainable Dev
18,460 4,769 5,329 28,558 8,097 (13,886) 22,769 17,048 5,721 7,830
Roads, Transport
& Fleet
11,798 4,995 2,377 19,170 4,181 (1,854) 21,497 19,462 2,035 12,257
Resource 
Total
31,638 11,242 7,694 50,574 12,530 (15,740) 47,364 38,925 8,439 21,462           
Education
Growth /
Accommodation
Pressures
5,531 (2,084) 2,316 5,563 1,458 (1,603) 5,418 5,037 381 4,259
ICT
Developments
1,600 38 0 1,638 0 0 1,638 1,788 (150) 842
Free School
Meals
0 308 (78) 430 332 0 762 821 (59) 129
Education Other 0 480 123 603 (50) 0 553 553 0 436
Resource 
Total
7,131 (1,258) 2,361 8,234 1,740 (1,603) 8,371 8,199 172 5,666           
Finance & Corporate
IT Services 2,246 684 156 3,086 0 0 3,086 2,753 333 2,468
Resource 
Total  2,246  684  156  3,086  0  0  3,086  2,753  333  2,468           
Housing & Technical
Office Accom 5,852 3,742 (919) 8,675 0 0 8,675 7,261 1,414 5,686
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 (1,000) 0 0 0 0 0
Other Housing 304 29 921 1,254 700 (645) 1,309 859 450 411
Resource 
Total
7,156 3,771 2 10,929 (300) (645) 9,984 8,120 1,864 6,097  
Social Work
Alarms / SWIS
Plus
1,341 (318) 4 1,027 0 0 1,027 1,027 0 529
Resource Total  1,341    (318)  4  1,027  0  0  1,027  1,027  0  529           
Overall Total 49,512 14,121 10,217 73,850 13,970 (17,988) 69,832 59,024  10,809 36,223
13

Page 14

APPENDIX C 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 24 JANUARY 2025 
2024/25
Original
Estimate
inc C/F 
2024/25
Revised
Budget 
2024/25
Forecast
Spend 
2024/25
Forecast
Variance 
2024/25
Actual to
24/01/25      
Expenditure £m £m £m £m £m      
General Fund Programme 73.850 69.832 59.024 10.808 36.223       
Income
2024/25
Budget
2024/25
Revised
Budget  
2024/25
Actual
To
24/01/25         
£m         £m   £m
Prudential Borrowing 32.564 16.460   16.460
Developers Contributions 8.800 7.474   3.830
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund,
Cycling Scotland, Transport Scotland
and REF / Wind Farms) 
0.958 4.814   1.485
Scottish Government:     
- Capital Grant 20.156 23.710   19.263 
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant) 
- Road Safety Improvement
1.440 
0.000
0.000 
0.497  
0.000 
- Vacant and Derelict Land 1.793 1.343   1.343 
- Regeneration Capital Grant  2.170 2.170   0.997 
- Place Based Investment
Programme
0.727  1.056  0.727
Shared Prosperity Fund 2.645 2.649   0.000
Levelling Up Fund 0.000 7.400   2.839
Capital Receipts 1.340 1.340   1.340
Specific Reserves 1.257 0.919   0.793
Revenue Contribution 0.000 0.000   0.000      
TOTAL FUNDING 73.850 69.832   49.077 
14

Page 15

Appendix D
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2024/25 
BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 24 JANUARY 2025 (PERIOD 11)
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status               
Projects Complete  - 1 1 6 9 17 23 35 41 43 45 - - -
Projects on Programme  - 85 92 102 99 105 104 106 106 116 124 - - -
Projects Behind
Programme 
- 0 0 0 0 0 2 0 0 0 0 - - -
Projects Altered Brief/
Programme 
- 2 2 2 1 1 1  2 1 0 1 - - -
Projects Held  - 15 14 23 24 33 33 32 31 32 32 - - - 
- 103 109 133 133 156 163 175 179 191 202 0 0 0               
Project Status               
Design Feasibility  - 43 49 73 71 88 88 94 90 98 92 - - -
Sketch Design  - 1 1 1 1 4 4 6 5 4 10 - - -
Detailed Design  - 0 0 0 0 0 0 0 0 0 1 - - -
Production Information  - 9 9 8 8 8 9 7 7 10 8 - - -
Tendering  - 24 24 25 26 23 24 17 24 24 33 - - -
On Site  - 25 25 20 18 16 15 16 12 12 13 - - -
Complete  - 1 1 6 9 17 23 35 41 43 45 - - - 
- 103 109 133 133 156 163 175 179 191 202 0 0 0 
15

Page 16

Appendix D
(Page 2)
General Services Capital Programme 2024/25 
Build Variance Explanations 
Project Name Status Variance Explanation
- - - 
16

Page 17

Appendix E
(Page 1) 
GENERAL FUND CAPITAL PROGRAMME 2024/25                     
NON BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 24 JANUARY 2025 (PERIOD 11) 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Number of Projects           
Carried Forward 23/24
Programme - - 31 31 31 31 31 31 31 31 31   
Approved from 24/25
Programme - - 5 5 5 5 7 7 7 7 7   
Total Projects Currently
Reported - - 36 36 36 36 38 38 38 38 38   
Number of Projects                           
Projects Completed - - 2 2 2 2 6 7 7 7 7   
Projects Ahead of
Programme - - 0 0 0 0 0 0 0 0 0   
Projects on Programme - - 34 34 34 34 30 31 31 31 31   
Projects Behind
Programme - - 0 0 0 0 2 0 0 0 0                  
Projects, Altered
Brief/Programme - - 0 0 0 0 0 0 0 0 0   
Projects On Hold  - - 0 0 0 0 0 0 0 0 0 
- - 36 36 36 36 38 38 38 38 38   
17

Page 18

Appendix E
(Page 2)
General Services Capital Programme 2024/25
Non-Build Executive Summary – Project Status 
Project Status
SLLC - Booking and Admission System On programme
Philipshill Cemetery - Extension  Complete
Ash Die Back On programme
Langlands Boardwalk On programme
Bin Storage Areas On programme
Nature Restoration Fund Complete
Renewal of Play Parks On programme
Greenhall Replacement Bridge On programme
White Bridge Replacement, Chatelherault Country Park (cost design) On programme
McKirdy Park On programme
Alexander Hamilton Memorial Fountain - Stonehouse Park On programme
Douglas Primary School - Floodlights Complete
Calderglen Country Park - One Way System & Infrastructure On programme
Three Rivers / Clydesdale Way On programme
East Kilbride Town Centre Masterplan On programme
Rural Development Centre - Lanark  Complete
SLC Industrial Infrastructure - Energy Efficiency  On programme
Carnwath Community and Business Enterprise HUB On programme
Carluke High Mill Community Facility On programme
Shawfield Remediation and Development On programme
Kirktonholme Pitches Complete
Biggar Youth Project Complete
Cambuslang Streetscape - Phase 2 Complete
Coalyard Housing On programme
Outdoor Space - Lanark On programme
Hamilton Town Centre Masterplan On programme
New Cross Shopping Centre On programme
Vacant & Derelict Land On programme
Schools ICT On programme
IT Infrastructure Refresh On programme
Oracle Upgrade On programme
Digital Transformation Review Fund On programme
Public Switch Telephone Network / Alarms (Analogue to Digital) On programme
Lock Up Areas  Complete
Gypsy Travellers Sites On programme
Central Energy Efficiency Fund  On programme
Community Alarms On programme
Replacement SWISS Plus IT System On programme 
18

Page 19

Appendix E
(Page 3) 
General Services Capital Programme 2024/2025 
Non Build Variance Explanations 
Project Name Status Variance Explanation
- - - 
19

Page 20

Appendix F
(Page 1) 
GENERAL SERVICES CAPITAL PROGRAMME 2024/25 
ROADS EXECUTIVE SUMMARY 
PERIOD ENDED 24 JANUARY 2025 (PERIOD 11)                             
1 2 3 4 5 6 7 8 9 10 11 12 13              
Number of Projects             
Total Projects Currently Reported - - 166 172 183 185 185 188 188 189 196                
Programme Status             
Projects Complete - - 31 39 53 74 82 101 109 120 133                
Projects on Programme - - 135 133 128 103 95 75 67 57 49                
Projects Behind Programme - - 0 0 0 0 0 0 0 0 0                
Projects, Altered Brief / Programme - - 0 0 0 0 0 1 0 0 0                
Projects Still to Commence - - 0 0 2 8 8 11 12 12 14                 
- - 166 172 183 185 185 188 188 189 196                
Project Status             
Briefing - - 32 28 24 13 13 14 12 12 14                
Production Information - - 82 77 87 68 67 54 47 37 25                
Billing - - 0 0 0 0 0 0 0 0 0                
Tendering - - 3 3 5 4 4 1 2 3 1                
On Site - - 18 25 14 26 19 18 18 17 23                
Complete - - 31 39 53 74 82 101 109 120 133                 
- - 166 172 183 185 185 188 188 189 196   
20

Page 21

Appendix F
(Page 2) 
General Services Capital Programme 2024/2025 
Roads Variance Explanations 
Project Name Status Variance Explanation
Roads Refurbishment Budget
Structures Projects
Mauldslie Road  Project deferred  Project deferred to 2025/2026 due to
Scottish Water emergency water main
repair works. 
A73 Hyndford Rd  Project deferred Project deferred to 2025/2026 due to
encountering engineering difficulties and
further design/investigations works are
required. 
21

Page 22

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Marchmont Gardens/Failford Road, Strathaven 1 1
Hawthorn Terrace, East Kilbride 1 1
Mount Cameron Drive South and Easdale, East Kilbride 1 1
Stewartfield  Crescent, East Kilbride 1 1
A749 Glasgow Road , East Kilbride (Kingsgate) 1 1
Telford Road, East Kilbride 1 1
Livingstone Drive, East Kilbride 1 1
Troon Avenue, East Kilbride 1 1
Angus Place and Semphill Gardens, East Kilbride 1 1
Stobo, East Kilbride 1 1
Kype Highway / High Kype Road, Strathaven 1 1
Loch Assynt, East Kilbride 1 1
Glasgow Road Service Road, Rutherglen 1 1
Village Road, Cambuslang 1 1
Langlea Road, Rutherglen 1 1
Wellshot Drive, Cambuslang 1 1
Main Street, Rutherglen 1 1
Drainage Action Plan 1 1
Surface Dressing/Preventative Maintenance Schemes
Ardochrig Highway, Auldhouse 1 1
Bents Road, Chapelton 1 1
Burn Highway, Chapelton 1 1
Cairnmuir Road, East Kilbride 1 1
Hairshaw Highway, Strathaven 1 1
Waterhead Peelhill Highway between A71 & B743 1 1
Waterhead Peelhill Highway between A71 & B744 1 1
Preparatory works 24/25 (Patching and drainage) 1 1
Preventative maintemance (Rhinophalt / prep patching) 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title
22

Page 23

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching
Newton Station Road, Halfway 1 1
Glen More EK North 1 1
Tewkesbury Road EK 1 1
Buchandyke Road EK 1 1
Capel Grove, EK 1 1
Parking Area Shaftsbury Court EK 1 1
Rockhampton Avenue EK 1 1
Inglis Place, EK  1 1
Craigend Road. 1 1
Castleview Road, Strathaven 1 1
WP Highway, Gilmourton 1 1
St Annes Well, Strathaven 1 1
Crutherland Highway 1 1
Millwell Road, Auldhouse 1 1
Churchill Avenue, EK 1 1
Kirktonholme Road, EK 1 1
Kirktonholme Road, EK 1 1
Quarry Road at Stroud Road 1 1
Stroud Road near column R59 1 1
Eaglesham Road at train station 1 1
Eaglesham Road RAB with Peel Road 1 1
Shawfield Drive, Rutherglen 1 1
Elder Crescent, Cambuslang 1 1
Greenhill Road, Rutherglen 1 1
Main Street, Rutherglen 1 1
Stonelaw Road, Rutherglen 1 1
Footways
Stewartfield Crescent, East Kilbride 1 1
Kirk Street, Strathaven 1 1
Caribou Green, Three Rivers Walk, East Kilbride (Slabs to asphalt) 1 1
Dovecastle Drive, Strathaven 1 1
Machline, East Kilbride (Slabs to asphalt) 1 1
Steps at railway solum - East Mains Road, Rosslyn Ave and Glamis Drive 1 1
Cathcart Road, Rutherglen 1 1
Curtis Avenue, Rutherglen 1 1
Stonelaw Road, Rutherglen 1 1
23

Page 24

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Hamilton Area
Strategic Schemes 
Muttonhole Road (Phase 2) 1 1
Lanark Road, Rosebank, Larkhall 1 1
Drygate Street, Larkhall 1 1
A72, Lanark Road, Highlees, Larkhall 1 1
Campbell Street, Hamilton 1 1
Strategic Corridor Improvements, A72 1 1
Strategic Infrastructure  (Drainage Schemes)
Summerlee Road, Larkhall 1 1
Green Street, Stonehouse 1 1
Meikle Earnock Road, Hamilton 1 1
Millheugh Road, Larkhall 1 1
Boag Road, Stonehouse 1 1
DR - Sydes Brae, Blantyre 1 1
Preventative Maintenance Schemes
Palace Grounds Road, Hamilton (*TRIAL*) 1 1
Auchentibber Road, Blantyre 1 1
Sandford Road (Phase 1), Stonehouse 1 1
Boghead Highway, Hamilton 1 1
2025/26 Schemes - Preparatory Patching 1 1
24

Page 25

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching
Swisscott Avenue, Hamilton 1 1
Wellcroft Road, Hamilton  1 1
A72, Lanark Road, Dalserf 1 1
Burnhouse Road, Hamilton 1 1
Woodlands Avenue, Bothwell 1 1
Morven Avenue, Blantyre 1 1
Palace Grounds Road, Hamilton 1 1
Caird Street, Hamilton 1 1
Townhead Street, Hamilton 1 1
Millheugh Brae, Larkhall 1 1
Candermill and Marlage Road, Larkhall 1 1
Glenburn Avenue, Stonehouse 1 1
Third Road, Blantyre 1 1
Bothwell Road, Uddingston 1 1
Parkneuk Road, Blantyre 1 1
Newhousemill Road, Hamilton 1 1
Muttonhole Road / Highstonehall Road 1 1
Muir Street, Hamilton 1 1
Grier Place, Larkhall 1 1
Brankholm Brae, Hamilton 1 1
Millheugh Road, Larkhall 1 1
Safety Defects patching various locations 1 1
Footways
Nairn Avenue, Blantyre 1 1
Station Road, Blantyre 1 1
Chestnut Grove, Blantyre 1 1
Craigmuir Road, Blantyre 1 1
Anderson Street / Stewart Street, Hamilton 1 1
Darngaber Gardens, Quarter 1 1
Castle Avenue, Bothwell (Phase 1) 1 1
Castle Avenue, Bothwell (Phase 2) 1 1
Haddow Street, Hamilton 1 1
Woodside Walk, Hamilton 1 1
Lowther Crescent, Stonehouse  1 1
Limekilnburn Road, Quarter 1 1
Covanburn Avenue, Hamilton 1 1
Meadows Avenue, Larkhall 1 1
25

Page 26

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Clydesdale Area
Strategic Schemes 
A706 Harelaw Roundabout 1 1
A73 Lanark Road, Carluke 1 1
A72 Lanark Road, Crossford 1 1
B715 Climpy Road. Forth 1 1
B7016 Forth to Braehead 1 1
A70 Hazelside to Glespin 1 1
Glenafeoch Road, Carluke 1 1
C4 from Kilncadzow to Lanark (Cartland) 1 1
C37 Harelaw 1 1
B797 Leadhills 1 1
B7018 Lesmahagow Road, Kirkfieldbank 1 1
Roman Court, Cleghorn 1 1
B7078 Carlisle Road, Lesmahagow 1 1
Smyllum Road, Lanark 1 1
Jerviswood Road/North Vennel, Lanark 1 1
Orchard Street/Mill Road, Carluke (Sheltered Complex) 1 1
B7016 Libberton to Brownhill Farm 1 1
C1 Mauldslie Road 1 1
Luggie Road/Weighouse Road, Carluke 1 1
B7078 Carlisle Road, Blackwood 1 1
A70 Pretsmill 1 1
The Cut, Lesmahagow 1 1
Gallowhill Road, Lanark 1 1
Boghall Road, Carluke 1 1
C37 Carstairs Junction  - Pettinain 1 1
Strategic Infrastructure  (Drainage Schemes)
C4 Moor Road, Carland 1 1
A73 Hyndford Rd - Turning of the staff/Sensory Gardendford Road 1 1
Preventative Maintenance Schemes
B797 New Glendorch, Leadhills 1 1
B797Broadlaw Kennels, Leadhills 1 1
Mill Road, Dolphinton 1 1
Libberton Muir Road 1 1
Greenshields Road, Biggar 1 1
Hillhead Road, Covington 1 1
A73 Meadowfoot Road, Covington 1 1
A70 Redford Bridge 1 1
Preparatory patching, various locations 1 1
Strategic Patching
Strategic/Machine Patching, Classified Road mainly 1 1
26

Page 27

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Footways
Roman Court, Cleghorn 1 1
Forrest Road, Lanark 1 1
B7078 Milton 1 1
Violet Bank 1 1
PARTICIPATORY BUDGET
Clydesdale Area
Footways
St Leonard Steet, Lanark 1 1
ROADS REFURBISHMENT BUDGET
Structures projects
East Kilbride line electrification – Maintenance/refurb of four SLC structures 1 1
Duke Street MSCP – Next phase (3) of the structural appraisal 1 1
Burnhouse Bridge by Auldhouse – refurbishment and repair 1 1
Cornwall Street Footbridge, East Kilbride – assessment of half joints 1 1
Priestburn Bridge – refurbishment and repair 1 1
Elvanfoot Bridge – bridge refurb & installation of high containment kerbing 1 1
Quothquan/StJohns Kirk ~ scour repairs 1 1
Westshield Bridge ~ refurbishment and repair 1 1
Traffic and Transportaion
Minor works ~ various lining & signing works 1 1
Vehicle Activated Signs ~ Upgrades 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure 1 1
BRIDGES
Clyde Bridge ~ Replacement of existing structure 1 1
20mph/30mph ROAD AND PLACE CRITERIA ASSESSMENT
Road assessments for speed limits in appropriate areas 1 1
PARK AND RIDE PROJECTS
Hairmyres P & R 1 1
CYCLING SCOTLAND
Cycle shelters at schools (Phase 1) 1 1
Cycle shelters at schools (Phase 2) 1 1
SCOTTISH GOVERNMENT TIER 1 FUNDING (FORMERLY CWSR)
Active Travel Routes
Pedestrians and cyclists facilities as part of Hairmyres Station project. 1 1
Grounds ~ Landscaping works , Cycle Path, Churchill Avenue 1 1
27

Page 28

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2024/25
PROJECT / PROGRAMME STATUS ~ PERIOD 11
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Pedestrian and cycle improvements
Ph.2 ~ Burnbank Road near West Stewart Street 1 1
Junction Upgrade
Redwood Drive ~ Junction Upgrade 1 1
SCOTTISH GOVERNMENT TIER 2 FUNDING
Redwood Drive, EK ~ Active Travel works 1 1
LOCAL AUTHORITY DIRECT AWARD
High Common Road ped crossing upgrade 1 1
Main Street/Nairn St. Blantyre ped crossing upgrade 1 1
Main Street/Broompark, ped crossing upgrade 1 1
Cadzow Sreet ped crossing upgrade (toucan) 1 1
Portland Square, ped crossing upgrade 1 1
Stonelaw Road at Tesco 1 1
Cycle counter upgrades 1 1
ROAD SAFETY IMPROVEMENT FUND
A70,  from A73 Hyndford Rd to A743 Ravenstruther 1 1
A726, from Torrance Roundabout to Strathaven 1 1
A706, Forth to council boundary 1 1
Hillhouse Road/ Technology Avenue, Hamilton 1 1
A71 Ayr Road nr. Burnhead Road, Shawsburn 1 1
COMMUNITY BUS FUND
Land Purchase at Lanark Bus Station 1 1
CITY DEAL PROJECTS
Cathkin ~ Loss of value and Noise Insulation Regulations surveys 1 1
Stewartfield Way 1 1
Greenhills/Strathaven Road 1 1
SCOTTISH GOVERNEMNT ~ EV INFRASTRUCTURE
Upgrade charge points to contactess payment 1 1
SUSTRANS
NCN756 Main Street, Rutherglen ~ Pedestrian/cyclist crossing improvements 1 1
14 25 0 1 23 133 133 49 0 0 14
28

Page 29

Report
Agenda Item
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 20 March 2025
Report by: Executive Director (Finance and Corporate Resources)
Subject: Capital Budget Monitoring 2024/2025 - Housing Capital
Programme
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April 2024 to 24
January 2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted.
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 24 January 2025 from
both a financial and physical perspective.
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B.
4. 2024/2025 Housing Capital Programme
4.1. 2024/2025 Budget:  The revised Housing Capital Programme for the year is £77.248 million
as approved by the Executive Committee on 12 March 2025.
4.2. Programmed funding for the year also totals £77.248 million.  The budget, along with a
detailed breakdown of the funding sources is included in Appendix A to this report.  
4.3. 2024/2025 Forecast:  As noted in 4.1, the total capital spending programme for the year
is £77.248 million.  Current estimates from Housing and Technical Resources have
identified an outturn of £73.112 million for the year.
4.4 The underspend of £4.136 million is a result of delays in site starts at Cairnswell Avenue,
Cambuslang and Brackenhill Farm, Hamilton.  In addition, the average purchase price for
properties purchased through the Market Purchase Scheme has reduced reflecting the
current size of properties.  Any Council funding not utilised in year (borrowing) will carry
forward into the next financial year.
4.5 2024/2025 Actual Position:  Spend to 24 January 2025 on the Housing Capital
Programme amounts to £46.103 million.  
3b
29

Page 30

4.6 As at 24 January 2025, £46.103 million of funding had been received.
5. Employee Implications
5.1. There are no employee implications as a result of this report.
6. Financial Implications
6.1. The financial implications are detailed in section 4 of this report.
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings.
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a change
to existing policy, function or strategy and therefore no impact assessment is required.
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report.
Jackie Taylor
Executive Director (Finance and Corporate Resources)
4 March 2025
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
Previous References
 Executive Committee, 12 March 2025
List of Background Papers
 Capital Ledger prints to 24 January 2025
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 455637)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
30

Page 31

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2024/25
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 24 JANUARY 2025 
2024/25
Annual
Budget 
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25
Actual to
24/01/25 
£m £m £m £m
Expenditure 
2024/25 Budget  77.248  73.112  4.136  46.103     
2024/25
Annual
Budget  
2024/25
Actual to
24/01/25 
£m   £m
Income         
Capital Receipts 0.000   0.265
Capital Receipts – Land Sales 0.000   0.000
Capital Funded from Current Revenue 33.506   33.506
Prudential Borrowing 23.363   0.000
Scottish Government Specific Grant:    
- New Build 17.259   11.691
- Open Market Purchase Scheme 3.000   0.000
- Mortgage to Rent 0.120   0.353
Other Income 0.000   0.288 
77.248   46.103 
31

Page 32

Appendix B
(Page 1)
HOUSING CAPITAL PROGRAMME 2024/2025
EXECUTIVE SUMMARY
PERIOD ENDED 24 JANUARY 2025
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Programme Status               
Projects Complete  - 5 5 15 17 23 26 27 34 35 38 - - -               
Projects on Programme - 112 112 104 104 107 107 110 101 104 93 - - -               
Projects Behind
Programme 
- 8 5 4 1 2 0 0 2 1 1 - - -               
Projects Altered
Brief/Programme
- 2 6 5 3 2 2 1 4 2 6 - - -               
Projects Held  - 21 22 24 27 27 26 26 24 25 29 - - - 
- 148 150 152 152 161 161 164 165 167 167 0 0 0               
Project Status              
Design Feasibility  - 58 59 55 54 57 55 51 50 49 41 - - -               
Sketch Design  - 4 4 2 2 2 2 1 1 1 2 - - -               
Detailed Design  - 2 2 2 2 3 4 4 4 3 3 - - -               
Production Information - 9 9 13 12 11 10 11 13 15 14 - - -               
Tendering - 45 45 42 40 33 32 31 29 31 32 - - -               
On Site  - 25 26 23 25 32 32 39 34 33 37 - - -               
Complete - 5 5 15 17 23 26 27 34 35 38 - - -               
- 148 150 152 152 161 161 164 165 167 167 0 0 0 
32

Page 33

Appendix B
(Page 2) 
Housing Capital Programme 2024/2025 
Build Variance Explanations 
Project Name Status Variance Explanation   
Stonefield/Burnbrae/Kelvin
Gardens - Veranda
Refurbishment
Behind Programme Project delayed with surveys
being arranged for
fabrication works.   
33

Page 34

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 24/25 0 5.05 10.075 11.562 15.333 19.462 22.099 29.105 35.753 42.83 45.423 51.444 57.465 77.303
Revised Budget 24/25 0 5.05 10.075 11.647 15.503 19.717 22.439 29.53 36.263 43.425 46.103 52.209 58.315 77.248
Actual 24/25 0 5.05 10.075 11.647 15.503 19.717 22.439 29.53 36.263 43.425 46.103 0 0 0
0
10
20
30
40
50
60
70
80
90
£ Millions
HRA Capital Expenditure Profile Graph 24/25
34

Page 35

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 20 March 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Forum of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2024 to 24 January 2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s breakeven probable outturn position after Transfers to
Reserves (section 4), be noted;
(2) that the current forecast on the General Fund Revenue Account for 2024/2025
(section 5.1), and the actual spend as at 24 January 2025 (section 5 and
appendices 1 and 2), be noted; 
(3) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 24 January 2025 (section 6 and
Appendix 3 of the report), be noted. 
3. Background
3.1. This overview report will summarise the previously reported 2024/2025 Probable
Outturn position for the Council’s General Revenue Account to 31 March 2025.  An
Executive Summary is provided in section 4 outlining the detail of the General Fund
outturn position including details of proposed transfers to Reserves.  An update on
the projected outturn for 2024/2025 for both the Council’s General Fund (section 5)
and for the Housing Revenue Account (section 6) is also provided. 
4. Executive Summary – 2024/2025 General Services Probable Outturn 
4.1. As reported previously, the 2024/2025 probable outturn position for the General
Fund presented an underspend of £13.727 million.  This underspend is after the
previously identified/approved Corporate Transfers to Reserves (£26.890 million)
and approved Resource Transfers to Reserves (£4.963 million). 
4.2. The majority of the underspend had already been reported to the Executive
Committee as part of the 2025/2026 Revenue Budget Gap and Savings paper in
November 2024 (in relation to early outturn expectations for Loans Fund Review,
Utilities and Council Tax).  The position reflected marginal increases with an
underspend in Loan Charges now being £7.907 million (an increase of £0.661
million).  Utilities and Council Tax positions remained unchanged, and there was an
additional underspend in procurement savings of £0.520 million. 
4
35

Page 36

4.3. Transfers to reserves of £13.727 million were approved at the Executive Committee
(12 February 2025) as outlined below:- 
 that the £7.907 million underspend from the Loans Fund Review be transferred
to Reserves to support the Budget Strategy which could include the 2025/2026
Revenue Budget
 that the £2.000 million underspend in Utilities, the £0.520 million from
Procurement Savings and the £3.300 million over recovery of Council Tax,
totalling £5.820 million, be transferred to Reserves to support the Budget Strategy
which could include the 2025/2026 Revenue Budget 
4.4. Full details of the approved Transfers to Reserves in relation to the Loans Fund
Review (£7.907 million), Utilities (£2.000 million), Procurement savings (£0.520
million) and Council Tax (£3.300 million) were included in the report to the Executive
Committee on 12 February 2025. 
5. General Services 2024/2025 Projected Outturn as at 24 January 2025
5.1. The forecast position before and after Transfers to Reserves is shown in appendices
1 and 2.  The position presented in Appendix 2 reflects the probable outturn
underspend of £13.727 million as a Transfer to Reserves resulting in a breakeven
position for the Council’s 2024/2025 projected outturn (section 4.3). This is in line
with the probable outturn reported to Executive Committee on 12 February 2025. 
5.2. Redeterminations of 2024/2025 Revenue Grant Funding:  Subsequent to drafting
the paper to the Executive Committee (12 February 2025), the Scottish
Government’s 2025/2026 Budget has been progressing through the Stages of the
Parliamentary approval process.  As part of this process, additional earmarked
funding for 2024/2025 is anticipated. Further information has been received in
relation to indicative funding for the 2023/2024 Local Government pay deal.  The
Council were required to use reserves as part of the funding package for the
2023/2024 pay deal.  A one-off allocation of £1.239 million of indicative funding is
anticipated to be provided to replenish those reserves used.  There is, therefore, no
impact on the 2024/2025 projected outturn position as this funding will be transferred
to reserves when received. 
6. Housing Revenue Account Position
6.1. Appendix 3 shows the forecast position for the financial year, being a break-even
position for the Housing Revenue Account.   
6.2. This break-even position includes a lower than budgeted Transfer from Reserves
being required in the financial year.  This is mainly a result of an over recovery in
income due to greater than budgeted income from rent collection. 
7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. As detailed in sections 4 to 6 of the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
36

Page 37

10. Other Implications
10.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through 4 weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
10.2. There are no implications for sustainability in terms of the information contained in
this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
11.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 March 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Financial Resources Scrutiny Forum – 20 February 2025 
List of Background Papers
 Financial Ledger and budget monitoring results to 24 January 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: southlanarkshire.gov.uk
37

Page 38

Appendix 1 
Note:  While the Year to Date Actual at period 11 presents a net surplus position (£53.612m), this is timing only.  The forecast outturn
before transfers to reserves shows an underspend of £18.722 million.
Before Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 132.981 132.941 0.040 0.03% 102.800
Facilities Waste and Grounds 81.493 80.951 0.542 0.67% 60.877
Leisure and Culture 21.747 21.759 (0.012) (0.06%) 18.910
Planning and Regulatory Services 4.876 4.662 0.214 4.39% 3.345
Enterprise and Sustainable Development 6.917 6.551 0.366 5.29% 9.581
Roads, Transportation and Fleet 17.948 19.018 (1.070) (5.96%) 10.087
Education Resources 482.934 482.517 0.417 0.09% 396.910
Education 482.934 482.517 0.417 0.09% 396.910
Finance and Corporate Resources 41.785 40.929 0.856 2.05% 41.669
Finance Services - Strategy 2.014 2.027 (0.013) (0.65%) 2.697
Finance Services - Transactions 18.700 18.080 0.620 3.32% 14.098
Audit and Compliance Services 0.338 0.301 0.037 10.95% 0.367
Information Technology Services 7.534 7.439 0.095 1.26% 12.694
Communications and Strategy Services 2.710 2.546 0.164 6.05% 2.341
Administration and Licensing Services 4.164 4.006 0.158 3.79% 3.760
Personnel Services 6.325 6.530 (0.205) (3.24%) 5.712
Housing & Technical Resources 15.091 14.386 0.705 4.67% 17.849
Housing Services 9.182 8.678 0.504 5.49% 4.256
Property Services 5.909 5.708 0.201 3.40% 13.593
Social Work Resources 237.168 235.979 1.189 0.50% 181.212
Performance and Support Services 6.067 5.973 0.094 1.55% 4.542
Children and Families 49.098 48.768 0.330 0.67% 38.444
Adults and Older People 181.164 180.814 0.350 0.19% 137.526
Justice and Substance Misuse 0.839 0.424 0.415 49.46% 0.700
Joint Boards 1.902 1.902 0.000 0.00% 1.609
911.861 908.654 3.207 0.35% 742.049
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 911.861 908.654 3.207 0.35% 742.049
CFCR 0.000 0.000 0.000 0.00% 0.000
Loan Charges 39.589 31.682 7.907 19.97% 0.000
Corporate Items 6.857 2.581 4.276 62.36% (0.692)
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Outturn Underspend - T/f to Reserves 0.000 0.000 0.000 0.00% 0.000
Total Expenditure 981.597 966.207 15.390 1.57% 741.357
Council Tax 181.587 184.992 3.405 1.88% 156.532
Less: Council Tax Reduction Scheme (23.544) (23.649) (0.105) 0.45% (20.011)
158.043 161.343 3.300 2.09% 136.521
General Revenue Grant 411.521 411.521 0.000 0.00% 348.210
Non Domestic Rates 364.911 364.911 0.000 0.00% 308.771
Transfer from Reserves 47.122 47.122 0.000 0.00% 0.000
Total Income 981.597 984.897 3.300 0.34% 793.502
Net Expenditure 0.000 (18.690) 18.690 0.00% (52.145)
Period Ended 24 January 2025 (No.11)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
38

Page 39

Appendix 2 
Note:  While the Year to Date Actual at period 11 presents a net surplus position (£53.612m), this is timing only.  The forecast outturn
after transfers to reserves shows a breakeven position.
After Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 132.981 132.981 0.000 0.00% 102.800
Facilities Waste and Grounds 81.493 80.951 0.542 0.67% 60.877
Leisure and Culture 21.747 21.759 (0.012) (0.06%) 18.910
Planning and Regulatory Services 4.876 4.662 0.214 4.39% 3.345
Enterprise and Sustainable Development 6.917 6.551 0.366 5.29% 9.581
Roads, Transportation and Fleet 17.948 19.058 (1.110) (6.18%) 10.087
Education Resources 482.934 482.934 0.000 0.00% 396.910
Education 482.934 482.934 0.000 0.00% 396.910
Finance and Corporate Resources 41.785 41.785 0.000 0.00% 41.669
Finance Services - Strategy 2.014 2.027 (0.013) (0.65%) 2.697
Finance Services - Transactions 18.700 18.830 (0.130) (0.70%) 14.098
Audit and Compliance Services 0.338 0.301 0.037 10.95% 0.367
Information Technology Services 7.534 7.439 0.095 1.26% 12.694
Communications and Strategy Services 2.710 2.546 0.164 6.05% 2.341
Administration and Licensing Services 4.164 4.112 0.052 1.25% 3.760
Personnel Services 6.325 6.530 (0.205) (3.24%) 5.712
Housing & Technical Resources 15.091 15.091 0.000 0.00% 17.849
Housing Services 9.182 9.133 0.049 0.53% 4.256
Property Services 5.909 5.958 (0.049) (0.83%) 13.593
Social Work Resources 237.168 237.168 0.000 0.00% 181.212
Performance and Support Services 6.067 5.973 0.094 1.55% 4.542
Children and Families 49.098 49.607 (0.509) (1.04%) 38.444
Adults and Older People 181.164 181.164 0.000 0.00% 137.526
Justice and Substance Misuse 0.839 0.424 0.415 49.46% 0.700
Joint Boards 1.902 1.902 0.000 0.00% 1.609
911.861 911.861 0.000 0.00% 742.049
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 911.861 911.861 0.000 0.00% 742.049
CFCR 0.000 0.000 0.000 0.00% 0.000
Loan Charges 39.589 31.682 7.907 19.97% 0.000
Corporate Items 6.857 4.337 2.520 36.75% (0.692)
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Outturn Underspend - T/f to Reserves 0.000 13.727 (13.727) 0.00% 0.000
Total Expenditure 981.597 984.897 (3.300) (0.34%) 741.357
Council Tax 181.587 184.992 3.405 1.88% 156.532
Less: Council Tax Reduction Scheme (23.544) (23.649) (0.105) 0.45% (20.011)
158.043 161.343 3.300 2.09% 136.521
General Revenue Grant 411.521 411.521 0.000 0.00% 348.210
Non Domestic Rates 364.911 364.911 0.000 0.00% 308.771
Transfer from Reserves 47.122 47.122 0.000 0.00% 0.000
Total Income 981.597 984.897 3.300 0.34% 793.502
Net Expenditure 0.000 0.000 0.000 0.00% (52.145)
Period Ended 24 January 2025 (No.11)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
39

Page 40

Variance Explanations
1. The underspend in property costs is due to the net effect of lower than forecast bad debt write offs and forecast expenditure on grounds
maintenance charges partially offset by greater than forecast repairs and maintenance expenditure, electricity charges and fixtures and fittings
due to increased demand.
2. The underspend is mainly due to lower than forecast expenditure on postage, printing and stationery and mobile phone costs.
3. The overspend in Payments to Other Bodies reflects additional support payments for current IT systems.
4. The over recovery in income is due to greater than budgeted income from rent collection offset in part by lower-than-expected income from
laundry charges and reflects the severe weather insurance settlement being less than expected arising from ineligible expenditure.
5. The transfer to reserves is anticipated to be lower than budget due to the overall projected position.
6. The underspend is due to forecast loan charges being lower than budget along with interest on revenue balances being greater than anticipated. 
Appendix 3
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 14.415 14.509 0.041 0.28% 11.674
Property Costs 60.703 60.258 0.445 0.73% 1 43.115
Supplies and Services 1.543 1.552 (0.010) (0.65%) 0.386
Transport and Plant 0.195 0.161 0.068 34.87% 0.151
Administration 5.594 5.469 0.125 2.23% 2 0.349
Payment to Other Bodies 2.975 3.354 (0.379) (12.74%) 3 2.322
Payment to Contractors 0.100 0.100 0.000 0.00% 0.378
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 33.573 33.573 0.002 0.01% 0.005
Total Controllable Exp. 119.098 118.976 0.292 0.25% 58.380
Total Controllable Inc. (123.397) (124.666) 1.268 1.03% 4 (92.278)
Transfer to/(from) Balance Sheet (4.862) (3.310) (1.721) (35.40%) 5 0.000
Net Controllable Exp. (9.161) (9.000) (0.161) (1.76%) (33.898)
Loan Charges 9.161 9.000 0.161 1.76% 6 0.000
Net Controllable Exp. 0.000 0.000 0.000 0.00% (33.898)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 24 January 2025 (No.11)
Housing Revenue Account
40

Page 41

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 20 March 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget 2024/2025 - Detailed Resource
Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2024/2025
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the 2024/2025 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted. 
[1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 24 January 2025. The detailed papers cover the
General Services and also the Housing Revenue Account. 
3.2. The following information is provided for each Resource and the Housing Revenue
Account:- 
 an Executive Summary showing the top-level position
 details of the most significant variances across Subjective headings and across
Services
 a line-by-line trend analysis of the total Resource expenditure and income
across Subjective headings 
3.3. These are shown in appendices A to F attached. 
4. Employee Implications
4.1. None 
5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report.   
5
41

Page 42

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. The risk has been assessed as low given the detailed budget
management applied across the Resources. The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required.   
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 March 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Revenue Ledger prints to 24 January 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk 
42

Page 43

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 24 January 2025 (No.11)
Community and Enterprise Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Facilities, Waste and Grounds 81.493 80.951 0.542 0.67% 60.877
Leisure and Culture 21.747 21.759 (0.012) (0.06%) 18.910
Planning and Regulatory Services 4.876 4.662 0.214 4.39% 3.345
Environmental and Sustainable Devlopment 6.917 6.551 0.366 5.29% 9.581
Roads, Transportation and Fleet 17.948 19.018 (1.070) (5.96%) 10.087
Total Community and Enterprise Resources 132.981 132.941 0.040 0.03% 102.800
5
43

Page 44

Community and Enterprise Resources Variance Analysis 2024/25 (Period 11) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 4,078k
under
APT&C Basic/Superannuation/NI -
4,617k under 
Facilities, Waste and
Grounds Services -
2,713k under 
The projected variance is
mainly due to vacant posts
across the services. 
Recruitment is currently being
progressed. 
Planning and
Regulatory Services -
352k under 
Enterprise and
Sustainable
Development - 266k
under 
Roads, Transportation
and Fleet Services -
1,336k under 
Overtime - (502k) over Facilities, Waste and
Grounds Services -
(687k) over 
The overtime overspend is
predicted mainly within Grounds
and is due to vehicle checks,
verge maintenance works and
weekend work at cemeteries
and golf courses. There is also
a predicted overspend within
Waste due to staff absences. It
is anticipated these will be
offset by underspends in basic
pay (above).
44

Page 45

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.)
Roads, Transportation
and Fleet Services -
179k under 
The overtime underspend is
mainly due to anticipated
reduced overtime being worked
within Roads Construction for
roads maintenance works. 
Property Costs (819k) over Rates (120k) over Facilities, Waste and
Grounds Services -
(103k) over
The projected overspend is due
to domestic rates being applied
which previously had 100%
relief.   
Water Metered Charges - (26k) over Roads, Transportation
and Fleet Services -
(25k) over 
The level of Water charges to
supply the depots within Roads
Contracting is higher than the
budget set. 
Repairs & Maintenance - Internal -
(25k) over 
Roads, Transportation
and Fleet Services -
(20k) over 
The projected overspend mainly
relates to the upkeep of the
Road’s construction depots.   
Electricity Contract - (274k) over  Roads, Transportation
and Fleet Services -
(273k) over 
This projected overspend
mainly relates to higher than
budgeted electricity expenditure
on the charging of electrical
vehicles. 
Cleaning & Janitorial Supplies - (188k) 
over 
Facilities, Waste and
Grounds Services -
(195k) over
This projected overspend
relates to an increase in costs
for cleaning materials.
45

Page 46

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Health and Hygiene Materials - (61k)
over
Facilities, Waste and
Grounds Services -
(61k) over
The projected overspend
relates to an increase in costs
for health and hygiene materials
within Facilities Management.  
Refuse Uplifts - (63k) over Facilities, Waste and
Grounds Services -
(64k) over
The projected overspend
relates to greater than budgeted
costs for Refuse Uplifts within
Facilities Management.
Supplies &
Services 
(174k) over Computer Equipment Purchase -
(351k) over
Facilities, Waste and
Grounds Services -
(51k) over
This projected overspend
relates to costs associated with
laptop costs within schools.   
Roads, Transportation
and Fleet Services -
(296k) over 
This projected overspend
mainly relates to increased
costs for annual subscriptions
for computer licences within
Roads. 
IT Equipment Maintenance – (100k)
over 
Facilities, Waste and
Grounds Services -
(50k) over
The projected overspend is due
to costs for the cashless system
within Facilities Management. 
Roads, Transportation
and Fleet Services –
(63k) over 
The projected overspend is in
relation to upgrade costs for
Fleetplan. 
46

Page 47

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies &
Services (cont.) 
Equipment, Apparatus and Tools -
(199k) over 
Facilities, Waste and
Grounds Services -
(253k) over 
The projected overspend
relates to costs for catering and
cleaning equipment within
Facilities Management and also
general equipment costs within
Grounds Services. 
Small Tools - 105k under  Facilities, Waste and
Grounds Services –
80k under 
The projected underspend
within Grounds offsets the
overspend in Equipment.   
Roads, Transportation
and Fleet Services -
25k under 
The forecast is predicting less
spend on materials due to
reduced levels of work on roads
maintenance. 
Materials - 311k under Roads, Transportation
and Fleet Services -
291k under 
The forecast is predicting less
spend on materials due to
reduced levels of work on roads
maintenance. 
Protective Clothing & Uniforms - (66k)
over 
Facilities, Waste and
Grounds Services -
(65k) over 
The projected overspend
relates to PPE costs within
Facilities Management.
Transport and
Plant
(398k) over Fleet Services – Fuel – (132k) over Roads, Transportation
and Fleet - (108k) over 
The projected overspend is due
to fuel costs being higher than
budget. This is offset by an over
recovery in income. 
47

Page 48

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.) 
Fleet Services – Vehicle Hire – 69k
under 
Roads, Transportation
and Fleet – 69k under 
The projected underspend
within Fleet is due to the
number of vehicles with a return
condition being less than
budget, offset by corresponding
under recovery in income. 
Fleet Services - Repairs - (488k) over Roads, Transportation
and Fleet - (488k) over 
The projected overspend is due
to higher costs in relation to
outside repairs, material and
tyres within the Fleet Workshop. 
Fleet Service Charges - Vehicle
Maintenance - (218k) over 
Fleet Service Charges - Plant
Maintenance - 79k under 
Facilities, Waste and
Grounds Services -
(131k) over 
Roads, Transportation
and Fleet - (87k) over 
Roads, Transportation
and Fleet - 76k under 
This projected overspend is due
to higher than anticipated
charges for routine
maintenance within Waste,
Streets, Grounds and Facilities
Management. 
This projected overspend is due
to higher than anticipated
charges for routine
maintenance within Roads and
Roads Construction. 
This projected underspend is
mainly due to lower than
anticipated costs associated
with the upkeep of Winter plant
within Roads. 
48

Page 49

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.) 
Fleet Service Charges - Leasing -
128k under 
Fleet Service Charges - Hired
Vehicles - 317k under 
Fleet Service Charges – Contract Hire
– (255k) over
Facilities, Waste and
Grounds Services -
(77k) over 
Roads, Transportation
and Fleet – 187k under 
Roads, Transportation
and Fleet - 313k under 
Facilities, Waste and
Grounds Services -
(50k) over 
Planning and
Regulatory Services -
(16k) over 
Roads, Transportation
and Fleet – (157k) over 
This projected overspend
mainly relates to increased
annual charges as a result of
the purchase price of new
vehicles. 
This projected underspend
mainly relates to EV vehicles
that were previously on lease
now being on contract hire,
buses being returned by Fleet
Services and pool cars being
transferred to Social Work. 
This projected underspend
mainly relates to the lower
demand for hired vehicles
within the Roads Construction
Unit in carrying out
maintenance works. 
The projected overspend is due
to vehicles that were previously
on lease now being on contract
hire. 
49

Page 50

Subjective Head Variance  Subjective line Service / amount Explanation
Administration (126k) over Telephones – 46k under  Facilities, Waste and
Grounds Services – 9k
under 
The underspend is due to there
being less requirements for
telephones throughout the
services.   
Planning and
Regulatory Services -
15k under 
Enterprise and
Sustainable
Development - 15k
under 
Roads, Transportation
and Fleet - 7k under 
Mobile Phones – 43k under 
Advertising - (27k) over 
Medical Costs - (35k) over 
Facilities, Waste and
Grounds Services –
15k under 
Roads, Transportation
and Fleet - 21k under 
Roads, Transportation
and Fleet - (17k) over 
Facilities, Waste and
Grounds Services -
(31k) over 
The underspend is due to there
being less requirements for
mobile phones throughout the
services. 
The projected overspend is
mainly within Roads in respect
of the advertising of road
closures. 
The overspend reflects a higher
than anticipated level of medical
referrals due to staff absence
levels. 
50

Page 51

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
(cont.) 
Legal Expenses – (38k) over 
Training - (77k) over
Roads, Transportation
and Fleet - (7k) over 
Planning and
Regulatory Services -
(31k) over 
Roads, Transportation
and Fleet - (71k) over 
The overspend is within
Environmental and relates to
ongoing legal costs. 
The overspend relates to
greater than budgeted costs for
statutory training within the
Roads service. 
Payment to Other
Bodies 
34k under Other Local Authorities – 22k under Planning and
Regulatory Services -
27k under 
The projected underspend is
due to costs for Scientific
Services being less than
budget. 
Payment to
Contractors 
(836k) over Payment to Trading Service - (644k)
over
Enterprise and
Sustainable
Development – (59k)
over 
The projected overspend
relates to planned works at
various leisure centre car parks.   
Roads, Transportation
and Fleet - (585k) over 
The projected overspend mainly
relates to the greater than
budget payments to the Roads
Construction unit for routine
roads and lighting maintenance
works. 
51

Page 52

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors (cont.) 
Payment to Private Contractor -
(175k) over
Facilities, Waste and
Grounds Services -
(10k) over 
Roads, Transportation
and Fleet – (166k) over 
This projected overspend is
within Streets and relates to the
upkeep of the Crematorium. 
This projected overspend is
mainly the net effect of an
increased spend on bridge
repairs and statutory
inspections within Structures,
increased contract costs within
the Traffic Section on traffic
lights, partially offset by a lower
demand for Sub-Contractors
within Roads Construction. 
Income  (1,727k)
under
recovered
Sales - General - 805k over recovered Roads, Transportation
and Fleet - 893k over
recovered 
The over recovery mainly
relates to higher than
anticipated income from skip
permits and road closures.   
Fees and Charges - General - 50k
over recovered 
Planning and
Regulatory Services -
(171k) under recovered 
Roads, Transportation
and Fleet – 207k over
recovered 
The projected income is less
than anticipated for Planning
applications and Building
warrants. 
The projected over recovery is
due to the sale of vehicles
within Fleet and an over
recovery within Roads for
Construction Consents, partially
offset by an under recovery
within Parking.
52

Page 53

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges – Departments of
the Authority – 20k over recovered
Facilities, Waste and
Grounds Services -
(31k) under recovered
The projected under recovery is
the net effect of street cleansing
income being lower than
budget, Red Deer Centre
closing and income for
sheltered housing cleaning
being higher than budget. 
Roads, Transportation
and Fleet – 46k over
recovered 
The projected over recovery is
due to income for EV charging
points at council properties
within fleet. 
Fleet Services - (177k) under
recovered 
Roads, Transportation
and Fleet - (310k)
under recovered 
The forecasted under recovery
is mainly due to income for
leasing management fee and
return conditions being less
than budget.  
Other Income – (77k) under recovered  Facilities, Waste and
Grounds Services -
(64k) under recovered
The forecasted under recovery
is within Grounds and relates to
income for private contract and
additional housing work.  
Recovery From Capital - (744k) under
recovered 
Roads, Transportation
and Fleet - (744k)
under recovered 
The under recovery predicted is
due to a reduced design fee
income for capital works within
Transport and Engineering. 
53

Page 54

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.) Recharges - Departments of the
Authority - (1,666k) under recovered 
Roads, Transportation
and Fleet - (1,351k)
under recovered 
Facilities, Waste and
Grounds Services -
(315k) under recovered 
The projected under recovery is
due to the level of vacancies in
Roads resulting in lower than
budgeted recharges. This under
recovery is offset by an
underspend in employee costs. 
The under recovery is within
Grounds services and is mostly
due to less income from
adoption monies. 
* The underlined variances represent new variances since the last report.
54

Page 55

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 80,490 1,192 80,087 1,551 80,357 3,798 84,053 64,019 80,037 4,016
APT & C OVERTIME 2,150 (470) 2,285 (604) 2,189 (487) 1,702 1,520 2,204 (502)
APT & C SUPERANNUATION 4,739 745 4,754 731 5,048 530 5,578 3,859 5,149 429
APT & C NIC 6,668 24 6,509 186 6,731 288 7,018 5,577 6,846 172
TRAVEL AND SUBSISTENCE 23 0 23 0 27 6 36 2 27 9
OTHER EMPLOYEE COSTS 0 0 (106) 0 (117) 12 (105) 0 (117) 12
PENSION INCREASES 1,180 (66) 1,180 (66) 1,214 (73) 1,141 1,001 1,214 (73)
APPRENTICESHIP LEVY 0 0 0 0 (15) 15 0 0 (15) 15
EMPLOYEE COSTS 95,250 1,425 94,732 1,798 95,434 4,089 99,423 75,978 95,345 4,078
PROPERTY COSTS
RATES 1,046 0 1,046 0 1,099 (53) 979 1,109 1,099 (120)
SCOTTISH WATER - UNMETERED CHARGES 325 0 315 10 308 16 324 3 308 16
SCOTTISH WATER - METERED CHARGES 166 (10) 175 (20) 171 (17) 144 151 170 (26)
RENT 196 0 196 0 231 (11) 210 111 231 (21)
SERVICE CHARGE 42 0 42 0 48 (6) 42 44 48 (6)
FACTORING CHARGES 16 0 16 0 21 (5) 16 28 21 (5)
PROPERTY INSURANCE 288 0 288 0 280 8 288 275 280 8
SECURITY COSTS 43 1 43 1 53 (9) 44 46 53 (9)
GROUND MAINTENANCE 8 0 8 0 3 5 8 4 3 5
GROUNDS MAINTENANCE ADDITIONAL WORKS 0 0 0 0 1 (1) 0 34 1 (1)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 20 (10) 20 (10) 95 (25) 70 59 95 (25)
LIFE CYCLE MAINTENANCE 10 (10) 10 (10) 2 (2) 0 5 2 (2)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 24 7 24 7 341 (58) 283 299 341 (58)
SOLID FUEL HEATING MAINTENANCE 0 0 0 0 0 0 0 4 0 0
ASBESTOS 0 0 0 0 0 0 0 2 0 0
ELECTRICITY - CONTRACT 5,803 (14) 5,804 (15) 5,406 (252) 5,132 3,352 5,406 (274)
GAS 865 0 865 0 1,675 10 1,680 1,294 1,675 5
HEATING OIL 14 0 14 0 16 (2) 14 1 16 (2)
JANITORIAL SUPPLIES 1 0 1 0 0 0 0 0 0 0
CLEANING CONTRACT 20 0 20 0 15 5 15 15 15 0
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 475 (56) 475 (56) 632 (187) 444 538 632 (188)
HEALTH & HYGIENE MATERIALS 25 0 25 0 104 (61) 43 73 104 (61)
PEST CONTROL 0 0 0 0 0 0 0 4 0 0
REFUSE UPLIFT 404 1 413 1 468 (63) 405 335 468 (63)
OTHER PROPERTY COSTS 32 0 32 0 142 (111) 151 8 142 9
OFFICE ACCOMODATION FACILITIES 0 0 0 0 4 (1) 3 4 4 (1)
PROPERTY COSTS 9,823 (91) 9,832 (92) 11,115 (820) 10,295 7,799 11,114 (819)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 686 (132) 676 (122) 901 (349) 552 909 903 (351)
COMPUTER EQUIPMENT MAINTENANCE 46 0 46 0 47 (1) 46 4 47 (1)
I.T. EQUIPMENT MAINT-CONTRACT 216 5 216 5 317 (99) 218 66 318 (100)
I.T. ELECTRONIC MESSAGING 3 0 3 0 0 3 3 0 0 3
EQUIPMENT, APPARATUS AND TOOLS 951 0 952 (1) 1,485 (198) 1,287 736 1,486 (199)
SMALL TOOLS 107 0 107 0 1 105 106 12 1 105
FURNITURE - OFFICE 0 0 0 0 4 (4) 0 3 4 (4)
FURNITURE - GENERAL 3 0 3 0 0 1 1 0 0 1
FURNISHINGS (INCL. CROCKERY & LINEN) 110 0 110 0 114 2 116 26 114 2
MATERIALS 7,451 (77) 7,507 (78) 7,729 307 8,036 5,363 7,725 311
MATERIALS, APPARATUS AND EQUIPMENT 9 0 9 0 11 1 12 11 11 1
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0 23 (21) 2 25 23 (21)
TV LICENCES 0 0 0 0 0 0 0 1 0 0
FOOD PURCHASES 4,646 0 5,384 (222) 6,601 (1) 6,600 4,584 6,601 (1)
BEVERAGES 0 0 0 0 2 (2) 0 10 2 (2)
SCHOOL MILK 50 0 50 0 63 50 50 2 0 50
NURSERY MILK 108 0 108 0 0 22 22 22 0 22
NURSERY FRUIT/VEG 129 0 129 0 2 18 20 24 2 18
RECHARGES OF DIRECT FOOD COSTS 68 0 68 0 21 47 68 (8) 21 47
OPENING STOCK 0 0 0 0 0 0 0 2,227 0 0
CLOSING STOCK 0 0 0 0 0 0 0 (2,225) 0 0
PROTECTIVE CLOTHING & UNIFORMS 213 (4) 213 (5) 273 (66) 207 254 273 (66)
LAUNDRY COSTS 10 0 10 0 13 (3) 10 10 13 (3)
OTHER SUPPLIES AND SERVICES 1,455 (3) 1,467 (16) 347 324 414 143 389 25
CATERING - CONTRACT 0 0 0 0 0 0 0 1 0 0
CATERING - EXTERNAL 0 0 0 0 8 (8) 0 4 8 (8)
MAJOR SUPPLY OF ELECTRICAL POWER 2,498 0 2,498 0 2,984 0 2,984 1,114 2,984 0
OUTSOURCED MAIL 0 0 0 0 3 (3) 0 3 3 (3)
DELIVERY CHARGE 1 0 1 0 1 0 1 2 1 0
SUPPLIES AND SERVICES 18,762 (211) 19,559 (439) 20,950 125 20,755 13,324 20,929 (174)
55

Page 56

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 1 (1) 0 (4,190) 1 (1)
PURCHASE OF PLANT 41 22 41 22 62 1 63 5 62 1
FLEET SERVICES - DRIVERS 68 (7) 68 (7) 71 (10) 61 71 71 (10)
FLEET SERVICES - FUEL 2,998 0 2,998 0 3,620 (132) 3,488 2,996 3,620 (132)
FLEET SERVICES - VEHICLE HIRE 1,729 0 1,729 0 1,002 69 1,071 816 1,002 69
POOL CAR CHARGES - RENTAL 74 (12) 74 (12) 49 10 59 55 50 9
POOL CAR CHARGES - FUEL 18 4 18 4 (1) 21 20 0 (1) 21
POOL CAR CHARGES - ADDITIONAL COSTS 5 2 5 2 0 7 7 0 0 7
OTHER TRANSPORT COSTS 71 7 71 7 213 5 218 67 215 3
TRANSPORT INSURANCE 93 0 93 0 93 0 93 93 93 0
LICENCES 491 0 491 0 503 (12) 491 361 503 (12)
FLEET SERVICES - REPAIRS 2,007 (90) 2,206 (89) 3,083 (488) 2,595 2,478 3,083 (488)
PLANT SERVICES 19 0 19 0 2 17 19 1 2 17
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,453 (157) 4,453 (157) 4,824 (217) 4,607 3,845 4,825 (218)
FLEET SERVICE CHARGES - PLANT MAINTENANCE 235 34 235 34 263 79 342 221 263 79
FLEET SERVICE CHARGES - ASSET MODIFICATION 61 10 61 10 83 23 106 67 83 23
FLEET SERVICE CHARGES - LEASING 5,192 (128) 5,192 (128) 5,286 257 5,413 3,722 5,285 128
FLEET SERVICE CHARGES - HIRED VEHICLES 1,264 (108) 1,265 (109) 1,103 317 1,420 691 1,103 317
FLEET SERVICE CHARGES - CONTRACT HIRE 12 0 12 0 265 (221) 44 203 299 (255)
FLEET SERVICE CHARGES - ROAD FUND LICENCE 210 8 210 8 200 25 225 152 200 25
FLEET SERVICE CHARGES - FUEL 3,152 26 3,152 26 2,658 158 2,681 2,073 2,643 38
FLEET SERVICE CHARGES - DRIVERS 52 0 52 0 60 (3) 57 60 60 (3)
HIRE OF EXTERNAL VEHICLES 60 8 60 8 33 5 38 0 33 5
HIRE OF EXTERNAL PLANT 337 (9) 337 (9) 352 (13) 339 291 352 (13)
HIRE OF SKIPS 20 (3) 20 (3) 43 0 43 33 43 0
STORAGE 0 0 0 0 4 0 4 2 4 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 20 (18) 2 19 20 (18)
PUPIL TRANSPORT - SPECIAL EDUCATION 0 0 0 0 0 0 0 0 0 0
PUPIL TRANSPORT - OTHER 126 0 126 0 268 10 278 (6) 268 10
TRANSPORT AND PLANT 22,788 (393) 22,988 (393) 24,160 (111) 23,784 14,126 24,182 (398)
ADMINISTRATION
PRINTING AND STATIONERY 134 (6) 141 (3) 151 (12) 139 118 150 (11)
TELEPHONES 101 6 109 (4) 62 46 108 40 62 46
MOBILE PHONES 70 0 70 0 29 43 72 0 29 43
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 8 0 8 0 8 0 8 0
ADVERTISING - OTHER 75 0 75 0 102 (27) 75 72 102 (27)
POSTAGES/COURIERS 36 (3) 36 (3) 37 (4) 33 35 37 (4)
MEMBERSHIP FEES/SUBSCRIPTIONS 34 15 26 23 103 (12) 91 211 103 (12)
INSURANCE 260 0 260 0 262 (2) 260 262 262 (2)
MEDICAL COSTS 21 (14) 21 (14) 41 (35) 6 42 41 (35)
LEGAL EXPENSES 18 (16) 18 (16) 42 (38) 4 37 42 (38)
HOSPITALITY / CIVIC RECOGNITION 3 0 3 0 6 (3) 3 10 6 (3)
INTERNET AGENCY FEES 23 0 23 0 33 (10) 23 29 33 (10)
SECURITY UPLIFT FEES 26 0 26 0 19 7 26 13 19 7
OTHER ADMIN COSTS 4 0 4 0 6 (2) 4 4 6 (2)
TRAINING 3 0 3 0 82 (77) 5 29 82 (77)
ADMINISTRATION 816 (18) 823 (17) 984 (127) 857 902 983 (126)
PAYMENT TO OTHER BODIES
JOINT COMMITTEES - GENERAL 0 0 0 0 0 0 0 17 0 0
SPTE: ANNUAL BUS SUBSIDY 1,891 0 1,891 0 1,891 0 1,891 1,797 1,891 0
SPTE: BUS OTHER 258 0 258 0 258 0 258 258 258 0
SPTE: FERRIES 29 0 29 0 29 0 29 29 29 0
SPTE: UNDERGROUND 1,318 0 1,318 0 1,318 0 1,318 1,318 1,318 0
SPTE: OTHER 1,727 0 1,727 0 1,727 0 1,727 1,727 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 0 131 0 131 0 131 219 131 0
MANAGEMENT AND TECHNOLOGY 0 0 0 0 13 (13) 0 0 13 (13)
YOUTH EMPLOYMENT TRAINING 0 0 0 0 0 0 0 0 0 0
OTHER LOCAL AUTHORITIES 55 20 225 20 29 46 75 47 53 22
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 22 0 20 2 22 0 20 2
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 39 0 39 0 39 0 39 0
PAYMENTS TO OTHER BODIES 10,233 (12) 10,248 (12) 14,235 18 14,253 7,608 14,233 20
EXTERNAL AUDIT FEES 3 0 3 0 3 0 3 3 3 0
ACTIVITIES PROGRAMME 70 0 70 0 70 0 70 57 70 0
COUNSELLING 5 0 5 0 2 3 5 1 2 3
PRIVATE INDIVIDUALS - GENERAL 607 0 607 0 431 0 431 0 431 0
PAYMENT TO OTHER BODIES 16,388 8 16,573 8 20,196 56 20,252 13,081 20,218 34
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 285 0 135 0 1,183 (644) 539 73 1,183 (644)
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 0 302 0 315 (13) 302 16 315 (13)
PAYMENT TO PRIVATE CONTRACTOR 37,852 (137) 37,875 (137) 39,210 (175) 39,035 32,967 39,210 (175)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 0 0 4 (4) 0 40 4 (4)
PAYMENT TO CONTRACTORS 38,439 (137) 38,312 (137) 40,712 (836) 39,876 33,096 40,712 (836)
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 0 617 0 617 0 617 611 617 0
TRANSFER PAYMENTS 617 0 617 0 617 0 617 611 617 0
56

Page 57

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 0 0 0 0 0 0 0 1 0 0
I.T. EQUIPMENT LEASING-CONTRACT 214 (17) 214 (17) 197 9 207 15 199 8
FINANCING CHARGES 214 (17) 214 (17) 197 9 207 16 199 8
TOTAL EXPENDITURE 203,097 566 203,650 711 214,365 2,385 216,066 158,933 214,299 1,767
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 0 (37) 0 (61) 24 (37) (2) (61) 24
CONTRIBUTIONS FROM DEVELOPENT 0 0 0 0 0 0 0 0 0 0
CONTRIBUTIONS FROM OTHER BODIES (12,951) 0 (13,218) 0 (17,138) 24 (17,014) (4,809) (17,036) 22
ERDF GRANT 0 0 0 0 0 0 0 (404) 0 0
SALES - GENERAL (4,266) (20) (4,682) (120) (6,012) 485 (5,207) (4,546) (6,012) 805
SALES - DEPARTMENTS OF THE AUTHORITY (126) 0 (126) 0 (128) 2 (126) (115) (128) 2
FEES AND CHARGES - GENERAL (9,552) (535) (9,528) (580) (10,134) (23) (10,157) (7,703) (10,207) 50
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (6,867) 135 (6,867) 135 (7,853) 20 (7,833) (7,444) (7,853) 20
ELECTIONS - ACCOMMODATION USE 0 0 0 0 (4) 4 0 0 (4) 4
RENTAL INCOME (48) 0 (48) 0 (58) 10 (48) (48) (58) 10
FLEET SERVICES (12,584) 30 (12,784) 30 (12,791) (312) (12,969) (10,238) (12,792) (177)
OTHER INCOME (1,627) (1) (1,288) 0 (1,961) (169) (2,000) (1,135) (1,923) (77)
RECOVERY FROM CAPITAL (1,333) 0 (1,333) 0 (589) (744) (1,333) (450) (589) (744)
RECHARGES - DEPARTMENTS OF THE AUTHORITY (27,536) (175) (27,534) (176) (24,695) (1,666) (26,361) (19,239) (24,695) (1,666)
TOTAL INCOME (76,927) (566) (77,445) (711) (81,424) (2,345) (83,085) (56,133) (81,358) (1,727)
NET EXPENDITURE 126,170 0 126,205 0 132,941 40 132,981 102,800 132,941 40
57

Page 58

58

Page 59

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 24 January 2025 (No.11)
Education Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Education 482.934 482.517 0.417 0.09% 396.910
Total Education Resources 482.934 482.517 0.417 0.09% 396.910
5
59

Page 60

Education Resources Variance Analysis 2024/25 (Period 11) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 95k under Teachers Basic / Superannuation /
National Insurance - (1,327k) over 
APT&C Basic / Superannuation /
National Insurance - 1,435k under
Schools - (1,327k) over 
Early Years - 1,435k
under
The projected overspend
relates to the increased use of
supply teachers for absence
cover. 
The projected underspend
mainly relates to Early Years
posts and is the result of staff
turnover. 
Property Costs (265k) over Cleaning & Janitorial Supplies - (203k)
over
Schools - (203k) over The overspend is due to the
rising costs of cleaning and
janitorial supplies in schools
due to inflation. 
Supplies and
Services
(35k) over Aids for Clients – (70k) over 
Materials, Apparatus and Equipment –
(314k) over 
Catering Contract – (71k) over 
Schools - (70k) over 
Schools - (314k) over 
Schools (71k) over 
This overspend is due to the
increased demand and cost for
new equipment required by
children in school with complex
physical needs. 
The overspend is due to the
additional cost of per capita
expenditure reflecting the
growth in pupil numbers. 
The overspend is due to an
increased cost for food for
breakfast clubs. 
60

Page 61

Subjective Head Variance Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
Pupil Equity Fund – 417k under  Schools – 417k under The underspend reflects the
profile of Pupil Equity Fund
(PEF) spend and commitment
across the academic year in
line with school improvement
plans and will therefore be
carried forward to 2025/2026, to
be used in the April to June
2025 school session. 
Transport and
Plant 
(3,191k) over  Pupil Transport – ASN and Other –
(869k) over 
Pupil Transport - Strathclyde
Passenger Transport - (2,249k) over 
Schools - (869k) over 
Schools - (2,249k) over 
This is a demand led service
and reflects the volume of
children requiring ASN transport
to school and increased costs. 
This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs.
Administration
Costs 
18k under Conferences - 51k under Early Years - 51k
under 
The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated.     
Payments to Other
Bodies 
863k under  Other Local Authorities – (87k) over  Schools – (87k) over  The overspend is due to an
increase in external school
placements within other local
authorities.   
61

Page 62

Subjective Head Variance Subjective line Service / amount Explanation
Payments to Other
Bodies (cont.) 
Payments to Other Bodies - 980k
under 
Early Years - 980k
under 
This projected underspend is
due to less than anticipated
core Early Years spend
including cross boundary
charges to other Local
Authorities. 
Payment to
Contractors
255k under Payment to Private Contractor - 255k
under
Non schools - 255k
under
The projected underspend
relates to the timing of savings
associated with the renewal of
the insurance arrangements
within the contract this year. 
Transfer Payments  250k under Footwear and Clothing Grants - 250k
under 
Schools - 250k under  This projected underspend
reflects lower than anticipated
expenditure on footwear and
clothing grants during the
financial year, reflecting current
demand. 
Income 2,409k over
recovered
Fees and Charges - Other Local
Authorities - 596k over recovered 
Early Years Fees - 1,810k over
recovered 
Schools - 596k over
recovered 
Early Years - 1,810k
over recovered
This projected over recovery
reflects the increase in income
recovered from other Local
Authorities for children
attending schools in South
Lanarkshire. This income is
used to support the cost of
external placements. 
This projected over recovery in
Early Years’ fees relates to
increased uptake of available
nursery places beyond 1140
hours.
* The underlined variances represent new variances since the last report.
62

Page 63

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 183,678 (741) 183,939 (741) 191,037 (888) 190,237 153,117 191,125 (888)
TEACHERS SUPERANNUATION 42,049 (193) 42,034 (193) 49,335 (312) 49,014 39,138 49,326 (312)
TEACHERS NI 19,174 (81) 19,169 (81) 19,908 (127) 19,777 17,043 19,904 (127)
APT&C BASIC 68,993 1,450 69,268 1,309 72,342 1,323 73,667 57,181 72,344 1,323
APT&C OVERTIME 0 0 0 0 0 0 4 168 4 0
APT&C SUPERANNUATION 4,542 0 4,496 52 4,715 42 4,758 3,678 4,716 42
APT&C NIC 5,028 0 4,946 89 5,320 70 5,390 4,632 5,320 70
CARE STAFF - APT&C BASIC 0 0 0 0 0 0 0 75 0 0
CARE STAFF - APT&C SUPERANNUATION 0 0 0 0 0 0 0 4 0 0
CARE STAFF - APT&C NIC 0 0 0 0 0 0 0 6 0 0
MANUAL BASIC 0 0 0 0 0 0 0 32 0 0
MANUAL SUPERANNUATION 0 0 0 0 0 0 0 2 0 0
MANUAL NIC 0 0 0 0 0 0 0 3 0 0
SESSIONAL WORK 0 0 0 0 0 0 0 4 0 0
TRAVEL AND SUBSISTANCE 0 0 0 0 0 0 1 2 1 0
OTHER EMPLOYEE COSTS 0 0 0 0 71 0 0 71 0 0
PENSION INCREASES 434 0 434 0 447 (13) 434 371 447 (13)
PREMATURE RETIRALS 5,041 0 5,041 0 5,272 0 5,272 4,359 5,272 0
EMPLOYEE COSTS 328,939 435 329,327 435 348,447 95 348,554 279,886 348,459 95
PROPERTY COSTS
RATES 19,102 0 18,957 0 18,923 34 18,957 18,924 18,923 34
SCOTTISH WATER - UNMETERED CHARGES 0 0 0 0 0 0 0 2 0 0
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,385 0 1,385 0 1,336 0 1,336 922 1,336 0
SCOTTISH WATER - METERED CHARGES 782 0 782 0 806 0 806 605 806 0
RENT 266 0 266 0 316 (38) 278 205 316 (38)
SERVICE CHARGE 40 0 40 0 40 0 40 54 40 0
PROPERTY INSURANCE 480 0 480 0 505 (21) 484 498 505 (21)
SECURITY COSTS 68 0 68 0 72 (4) 72 64 76 (4)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 61 0 62 0 69 0 69 39 69 0
LIFE CYCLE MAINTENANCE 2 0 2 0 0 0 0 2 0 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 45 0 45 0 29 0 34 4 34 0
ADAPTIONS - INTERNAL CONTRACTORS 57 0 91 0 113 (37) 102 86 139 (37)
ELECTRICITY  - CONTRACT 8,691 0 8,691 0 9,765 0 9,765 6,395 9,765 0
ELECTRICITY  - NON CONTRACT 0 0 0 0 0 0 0 1 0 0
GAS 4,072 0 4,072 0 4,580 0 4,580 1,955 4,580 0
HEATING OIL 164 0 164 0 120 0 120 60 120 0
SOLID FUEL 170 0 170 0 307 0 307 246 307 0
FIXTURE & FITTINGS 1 0 0 0 0 0 0 1 0 0
JANITOR SERVICE 136 0 106 0 108 4 107 151 103 4
JANITORIAL SUPPLIES 0 0 0 0 0 0 3 0 3 0
CLEANING CONTRACT 754 0 754 0 451 0 534 534 534 0
CLEANING OUTWITH CONTRACT 8 0 8 0 3 5 8 0 3 5
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 556 (205) 626 (205) 650 (203) 456 490 659 (203)
HEALTH & HYGIENE MATERIALS 46 0 46 0 46 0 46 21 46 0
AKINDOAK CLEANING 5 0 4 0 1 2 3 0 1 2
REFUSE UPLIFT 17 0 17 0 24 (7) 17 22 24 (7)
REMOVAL & STORAGE COSTS 1 0 1 0 0 0 2 2 2 0
OTHER PROPERTY COSTS 116 0 116 0 30 0 30 6 30 0
ACCOMMODATION RECHARGE TO USERS 882 0 882 0 882 0 882 0 882 0
PROPERTY COSTS 37,907 (205) 37,835 (205) 39,176 (265) 39,038 31,289 39,303 (265)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 136 0 156 0 211 0 212 211 212 0
COMPUTER EQUIPMENT RENTAL 0 0 1 0 0 1 0 0 (1) 1
I.T. EQUIPMENT MAINT-CONTRACT 2,797 0 2,932 0 2,879 0 2,847 2,765 2,847 0
I.T. ELECTRONIC MESSAGING 6 0 6 0 8 2 6 10 4 2
EQUIPMENT, APPARATUS AND TOOLS 41 0 39 0 36 (2) 28 28 30 (2)
SMALL TOOLS 1 0 1 0 2 0 0 2 0 0
AIDS FOR CLIENTS 189 (72) 189 (72) 187 (70) 117 138 187 (70)
ADAPTATIONS FOR CLIENTS 30 0 34 0 37 0 32 32 32 0
SUPPLIES FOR CLIENTS 4 0 6 0 5 0 6 6 6 0
FURNITURE - OFFICE 7 0 5 0 7 0 7 8 7 0
FURNITURE - GENERAL 62 0 61 0 54 0 53 21 53 0
FURNISHINGS (INCL. CROCKERY & LINEN) 11 0 12 0 13 0 14 14 14 0
MATERIALS 8 0 9 0 12 0 12 12 12 0
MATERIALS, APPARATUS AND EQUIPMENT 1,743 (208) 1,682 (208) 2,006 (314) 1,735 1,006 2,049 (314)
PUPIL EQUITY FUNDING 4,066 0 3,719 0 2,641 417 2,755 (7) 2,338 417
SAC FUNDING 49 0 49 0 49 0 49 0 49 0
LIBRARY/RESOURCE CENTREMATERIALS 68 0 73 0 75 0 78 49 78 0
AUDIO VISUAL (3) 0 1 0 4 0 4 4 4 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 16 0 18 0 27 0 29 29 29 0
TV LICENCES - EDUCATION 24 0 24 0 24 0 25 4 25 0
FOODSTUFFS - GENERAL 1 0 1 0 1 0 1 1 1 0
PROVISIONS 39 0 35 0 125 0 124 124 124 0
FOOD PURCHASES 17 0 21 0 28 0 30 30 30 0
BEVERAGES 3 0 3 0 4 0 4 4 4 0
SCHOOL MILK 13 0 15 0 18 0 20 20 20 0
NURSERY MILK 60 0 102 0 60 0 66 66 66 0
NURSERY FRUIT/VEG 100 0 174 0 100 0 103 103 103 0
RECHARGE OF DIRECT FOOD COSTS 4 0 5 0 7 0 6 8 6 0
PROTECTIVE CLOTHING & UNIFORMS 23 0 24 0 24 0 25 23 25 0
LAUNDRY COSTS 3 0 3 0 3 0 3 2 3 0
OTHER SUPPLIES AND SERVICES 24 0 24 0 28 0 26 0 26 0
HEALTH AND SAFETY 133 0 134 0 85 0 85 75 85 0
CATERING - CONTRACT 2,828 0 2,709 0 2,809 (71) 2,744 2,831 2,815 (71)
CATERING - OUTWITH CONTRACT 7 0 6 0 4 2 7 2 5 2
CATERING - EXTERNAL 6 0 6 0 8 0 9 9 9 0
ARTIST FEES / PERFORMING ARTS / ENTERTA 0 0 1 0 0 0 0 2 0 0
DELIVERY CHARGE 3 0 4 0 3 0 6 6 6 0
SUPPLIES AND SERVICES 12,519 (280) 12,284 (280) 11,584 (35) 11,268 7,638 11,303 (35)
63

Page 64

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 4 0 4 0 5 (1) 4 5 5 (1)
OTHER TRANSPORT COSTS 2 0 2 0 2 0 2 1 2 0
INSURANCE 3 0 3 0 3 0 3 3 3 0
FLEET SERVICES - REPAIRS 1 0 1 0 1 0 1 1 1 0
FLEET SERVICE CHARGES 2,074 0 2,027 0 2,195 (72) 2,126 2,042 2,198 (72)
HIRE OF EXTERNAL VEHICLES 94 0 151 0 141 0 199 199 199 0
HIRE OF SKIPS 7 0 8 0 6 0 8 12 8 0
EXTERNAL TRANSPORT CONTRACT 7 0 8 0 7 0 8 14 8 0
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 7,074 0 7,075 0 7,766 (691) 7,076 5,263 7,767 (691)
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 10,948 (2,313) 10,948 (2,313) 10,884 (2,249) 8,635 8,159 10,884 (2,249)
PUPIL TRANSPORT - OTHER 149 0 149 0 346 (178) 168 66 346 (178)
TAXI CHARGES - AD HOC 1 0 1 0 1 0 1 1 1 0
TRANSPORT AND PLANT 20,364 (2,313) 20,377 (2,313) 21,357 (3,191) 18,231 15,766 21,422 (3,191)
ADMINISTRATION
PRINTING AND STATIONERY 411 0 435 0 477 7 501 469 494 7
TELEPHONES 228 0 225 0 257 (27) 233 183 260 (27)
MOBILE PHONES 8 0 8 0 8 0 7 0 7 0
ADVERTISING - OF COUNCIL SERVICE AVAILA 0 0 0 0 0 0 0 3 0 0
ADVERTISING - OTHER 11 0 11 0 5 6 11 0 5 6
POSTAGES/COURIERS 69 0 68 0 61 3 61 27 58 3
MEMBERSHIP FEES/SUBSCRIPTIONS 116 0 150 0 205 0 240 240 240 0
INSURANCE 76 0 76 0 76 0 76 76 76 0
MEDICAL COSTS 16 0 25 0 18 (6) 26 26 32 (6)
LEGAL EXPENSES 6 (5) 5 (5) 5 (5) 0 6 5 (5)
HOSPITALITY / CIVIC RECOGNITION 0 0 0 0 0 0 1 1 1 0
SECURITY UPLIFT FEES 4 0 5 0 5 0 7 7 7 0
OTHER ADMIN COSTS 2 0 2 0 2 0 2 0 2 0
CONFERENCES - MEMBERS (incl associated 5 0 5 0 3 0 5 5 5 0
CONFERENCES - OFFICIALS (incl associated costs) 53 0 2 50 1 51 52 (1) 1 51
TRAINING 266 50 375 0 376 (11) 417 418 428 (11)
TRAINING - TEACHERS 1 0 1 0 2 0 2 2 2 0
ADMINISTRATION 1,272 45 1,393 45 1,501 18 1,641 1,462 1,623 18
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 0 0 0 0 32 (32) 0 31 32 (32)
OTHER LOCAL AUTHORITIES 1,447 (15) 1,447 (15) 1,519 (87) 1,432 483 1,519 (87)
SCOTTISH QUALIFICATIONS AUTHORITY 1,570 0 1,570 0 1,574 (11) 1,563 1,576 1,574 (11)
PAYMENTS TO VOLUNTARY ORGANISATIONS 1 0 16 0 17 0 19 19 19 0
PAYMENTS TO OTHER BODIES 19,622 800 19,783 800 19,889 980 20,801 17,452 19,821 980
INDEPENDENT SCHOOL PLACES 6,960 (1,493) 6,960 (1,493) 4,777 0 4,777 4,589 4,777 0
CONTRACT SPEECH THERAPY 678 0 678 0 678 0 678 285 678 0
SCHOOL ACTIVITIES 184 0 198 0 204 0 209 191 209 0
SCHOOL MINI BUS GRANT 0 0 0 0 0 0 0 0 0 0
RESEARCH GRANTS - EDUCATION 45 0 45 0 38 0 39 45 39 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 27 0 28 0 15 13 28 22 15 13
P.E. FACILITIES 76 0 69 0 55 0 53 8 53 0
ACTIVITIES PROGRAMME 154 0 165 0 209 0 231 231 231 0
COUNSELLING 1,712 0 1,722 0 1,622 0 1,618 999 1,618 0
COPYRIGHT AGREEMENT 154 0 154 0 154 0 154 154 154 0
VAT FREE EXCURSIONS - EDUCATION 57 0 21 0 42 0 42 42 42 0
EDUCATION MANAGEMENT SAVINGS 0 0 0 0 0 0 0 0 0 0
PRIVATE INDIVIDUALS - GENERAL 11 0 13 0 9 0 11 12 11 0
PAYMENT TO OTHER BODIES 32,698 (708) 32,869 (708) 30,834 863 31,655 26,139 30,792 863
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 46,217 255 46,217 255 46,218 255 46,479 38,020 46,224 255
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 5 0 5 0 15 0 15 8 15 0
PAYMENT TO CONTRACTORS 46,222 255 46,222 255 46,233 255 46,494 38,028 46,239 255
TRANSFER PAYMENTS
RENT REBATES 338 0 400 0 562 0 599 599 599 0
FOOTWEAR & CLOTHING GRANTS 2,053 220 2,053 220 1,953 250 2,203 1,921 1,953 250
WORK EXPERIENCE 13 0 13 0 10 0 10 (1) 10 0
DIRECT ASSISTANCE TO PERSONS 0 0 0 0 1 0 1 1 1 0
TRANSFER PAYMENTS 2,404 220 2,466 220 2,526 250 2,813 2,520 2,563 250
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 3 0 3 0 0 3 3 0 0 3
I.T. EQUIPMENT LEASING - CONTRACT 409 0 404 0 383 15 396 198 381 15
FINANCING CHARGES 412 0 407 0 383 18 399 198 381 18
TOTAL EXPENDITURE 482,737 (2,551) 483,180 (2,551) 502,041 (1,992) 500,093 402,926 502,085 (1,992)
64

Page 65

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) 0 (170) 0 (170) 0 (170) (85) (170) 0
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (12,214) 0 (12,276) 0 (12,457) 0 (12,495) (1,632) (12,495) 0
CONTRIBUTIONS FROM OTHER BODIES (1,932) 0 (2,314) 0 (2,326) 0 (2,332) (1,894) (2,332) 0
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,570) 800 (1,569) 800 (1,366) 596 (770) (406) (1,366) 596
PLAYGROUP ACCOMMODATION CHARGE (10) 0 (10) 0 (19) 9 (10) (10) (19) 9
EARLY YEARS FEES (2,186) 1,751 (2,186) 1,751 (2,245) 1,810 (435) (1,958) (2,245) 1,810
RENTAL INCOME (20) 0 (20) 0 (14) (6) (20) (14) (14) (6)
OTHER INCOME (24) 0 (24) 0 (45) 0 (45) (17) (45) 0
ACCOMMODATION INCOME FROM USERS (882) 0 (882) 0 (882) 0 (882) 0 (882) 0
INCOME (19,008) 2,551 (19,451) 2,551 (19,524) 2,409 (17,159) (6,016) (19,568) 2,409
NET EXPENDITURE 463,729 0 463,729 0 482,517 417 482,934 396,910 482,517 417
65

Page 66

66

Page 67

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 24 January 2025 (No.11)
Finance and Corporate Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Finance Services - Strategy 2.014 2.027 (0.013) (0.65%) 2.697
Finance Services - Transactions 18.700 18.080 0.620 3.32% 14.098
Audit and Compliance Services 0.338 0.301 0.037 10.95% 0.367
Information Technology Services 7.534 7.439 0.095 1.26% 12.694
Communications and Strategy Services 2.710 2.546 0.164 6.05% 2.341
Administration and Licensing Services 4.164 4.006 0.158 3.79% 3.760
Personnel Services 6.325 6.530 (0.205) (3.24%) 5.712
Total Finance and Corporate Resources 41.785 40.929 0.856 2.05% 41.669
5
67

Page 68

Finance and Corporate Resources Variance Analysis 2024/25 (Period 11) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  82k under  APT&C Basic, Superannuation, NI –
173k under
Personnel – (52k) over  The projected overspend is
due to lower than budgeted
turnover during the year. 
Finance Services
(Transactions) – 124k
under 
Communications and
Strategy Services – 99k
under 
The projected underspend is
due to vacant posts within the 
Services. 
APT & C Overtime – (91k) over Personnel – (43k) over 
Finance Services
(Transactions) – (28k)
over 
IT Services – (15k) over 
The overspend is due to
increased workload from the
roll out of the Oracle Fusion
system.  Additional overtime
was necessary to meet
critical deadlines and
maintain service delivery. 
Property Costs  716k under Security Costs – (20k) over  Finance Services
(Transactions) – (20k)
over 
The projected overspend
reflects higher than budgeted
costs for security services. 
68

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (cont.) Fixture and Fittings – 750k under Finance Services
(Transactions) – 750k
under
The projected underspend is
due to additional funding
provided for the Scottish
Welfare Fund.  Due to the
timing of this funding being
awarded, an element of this
will be carried forward for use
next financial year. 
Supplies and Services (254k) over Computer Equipment Purchase –
(144k) over
IT Services – (103k)
over 
The projected overspend is
due to greater than budgeted
IT costs. 
I.T. Equipment Maintenance. –
Contract – (127k) over 
Finance Services
(Transactions) – (47k)
over 
IT Services – (105k)
over 
The projected overspend
reflects two contract renewals
for Civica ICON and Civica
Financials. 
The projected overspend
reflects the increased cost of
IT services.  This is partially
offset by an over-recovery of
income via recharges to
Resources.
Payments to Other
Bodies 
150k under Grants to Voluntary Organisations –
106k under 
Administration, Legal
and Licensing – 106k
under 
The projected underspend
relates to less than budgeted
spend on the Grants budget
which has been set aside to
support the use of reserves
as part of the 2025/2026
savings proposal. 
69

Page 70

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to Other
Bodies (cont.)
Payments to Other Bodies – 44k
under 
Personnel - £64k under The projected underspend
relates to lower than
anticipated legal costs in the
financial year.
Transfer Payments  5,273k under  Rent Allowance – 1,791k under 
Rent Rebates – 3,482 under
Finance Services
(Transactions) – 1,791k 
under 
Finance Services
(Transactions) – 3,482k
under 
The projected underspend in
these lines reflects the
demand-led spend on Rent
Allowance and Rent Rebates
and is offset by an under-
recovery of Income (below). 
Financing Charges (41k) over IT Equipment Leasing Contract –
(41k) over
Personnel – (31k) over The projected overspend in
Financing Charges is due to
higher than budgeted IT
leasing charges. 
Income  (5,064k)
under
recovered 
Statutory Additions – Cost of
Collections – 245k over recovered 
Rent Rebates Subsidy – (3,428k)
under recovered 
Rent Allowance Subsidy – (1,713k)
under recovered 
Finance Services
(Transactions) – 245k
over recovered 
Finance Services
(Transactions) - 
(3,428k) under
recovered. 
Finance Services
(Transactions) –
(1,713k) under
recovered 
The over-recovery of income
relates to Non-Domestic
Rates and an increase in the
value of cases passing to
summary warrant. 
The under recovery in these
lines is offset by the demand-
led underspend in Transfer
Payments (above). 
70

Page 71

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Contributions from Other Bodies –
(43k) under-recovered 
Other Income – (169k) under
recovered
Finance Services
(Transactions) – (48k)
under recovered 
IT Services – 138k over
recovered 
Finance Services
(Transactions) – (299k)
under recovered 
The under-recovery reflects
lower than budgeted income
for Housing Benefit
overpayments as a result of
the migration from legacy
benefits to universal credit for
working age. 
The over-recovery of income
reflects the increased
recharges of IT spend to
Resources and is offset by
overspends in Supplies and
Services Costs (above). 
The under-recovery reflects
lower than budgeted income
for Housing Benefit
overpayments as a result of
the migration from legacy
benefits to universal credit for
working age. 
* The underlined variances represent new variances since the last report.
71

Page 72

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
TEACHERS OVERTIME 1 (1) 1 (1) 1 (1) 0 1 1 (1)
APT & C BASIC 27,452 (528) 27,135 (397) 27,942 (351) 27,748 22,066 27,720 28
APT & C OVERTIME 78 50 100 28 214 (86) 128 203 219 (91)
APT & C SUPERANNUATION 1,628 253 1,681 154 1,652 394 2,062 1,269 1,875 187
APT & C NIC 2,722 (126) 2,684 (90) 2,763 (83) 2,711 2,238 2,753 (42)
OTHER EMPLOYEE COSTS (445) 30 (134) 30 222 16 16 0 0 16
PENSION INCREASES 983 1 997 (12) 996 (12) 984 830 999 (15)
EMPLOYEE COSTS 32,419 (321) 32,464 (288) 33,790 (123) 33,649 26,607 33,567 82
PROPERTY COSTS
RATES 0 0 0 0 0 0 0 10 10 (10)
RENT 5 0 5 0 4 1 5 3 4 1
SECURITY COSTS 141 (20) 141 (20) 141 (20) 121 110 141 (20)
REPAIRS & MAINTENANCE - EXTERNAL CONTRATOR 0 0 0 0 2 (2) 0 0 2 (2)
FIXTURE & FITTINGS 1,707 0 1,707 0 2,200 750 2,950 1,130 2,200 750
REMOVAL & STORAGE COSTS 0 0 0 0 1 (1) 0 1 1 (1)
OTHER PROPERTY COSTS 2,584 (1) 2,583 0 1,883 0 1,883 2 1,885 (2)
PROPERTY COSTS 4,437 (21) 4,436 (20) 4,231 728 4,959 1,256 4,243 716
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 4,492 (239) 4,464 (203) 4,412 (124) 4,293 4,472 4,437 (144)
COMPUTER EQUIPMENT MAINTENANCE 2,036 5 2,036 5 2,036 5 2,041 2,011 2,016 25
I.T. EQUIPMENT MAINT - CONTRACT 595 (2) 593 (1) 686 (99) 598 628 725 (127)
I.T. ELECTRONIC MESSAGING 25 11 25 11 0 36 36 0 0 36
EQUIPMENT, APPARATUS AND TOOLS 151 0 151 0 149 2 151 120 149 2
SUPPLIES FOR CLIENTS 219 0 219 0 241 0 241 123 241 0
FURNITURE - OFFICE 3 (2) 3 (2) 1 0 1 2 2 (1)
MATERIALS 112 0 112 0 96 16 112 56 96 16
MATERIALS, APPARATUS AND EQUIPMENT 2 0 3 (1) 3 (1) 2 4 3 (1)
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 3 0 3 0 2 0 2 0 2 0
FOODSTUFFS - GENERAL 28 (4) 28 (4) 17 6 23 8 17 6
PROTECTIVE CLOTHING & UNIFORMS 1 1 1 1 1 1 2 0 1 1
OTHER SUPPLIES AND SERVICES 113 9 111 9 123 (3) 120 82 124 (4)
HEALTH AND SAFETY 1 (1) 1 (1) 33 (33) 0 57 33 (33)
CATERING - OUTWITH CONTRACT 1 5 1 5 0 5 5 (2) 0 5
OUTSOURCED MAIL 174 0 174 0 209 (35) 174 123 209 (35)
SUPPLIES AND SERVICES 7,956 (217) 7,925 (181) 8,009 (224) 7,801 7,684 8,055 (254)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 1 0 1 1 1 0
POOL CAR CHARGES - RENTAL 10 5 8 7 6 9 15 1 6 9
POOL CAR CHARGES - FUEL 3 0 3 0 1 2 3 0 1 2
FLEET SERVICE CHARGES 14 2 16 0 18 0 18 7 18 0
TRANSPORT AND PLANT 27 7 27 7 26 11 37 9 26 11
ADMINISTRATION
PRINTING AND STATIONERY 529 (1) 517 12 516 5 521 274 518 3
TELEPHONES 1,416 135 1,412 139 1,410 141 1,551 1,349 1,420 131
MOBILE PHONES 246 (71) 246 (71) 191 (17) 174 179 190 (16)
ADVERTISING - RECRUITMENT 44 (15) 44 (15) 45 (16) 29 35 45 (16)
ADVERTISING - OTHER 123 0 123 0 124 (1) 123 107 124 (1)
POSTAGES/COURIERS 1,026 (118) 1,051 (117) 1,022 (102) 920 655 1,023 (103)
SMS MESSAGING 10 0 5 0 8 (3) 5 6 7 (2)
MEMBERSHIP FEES/SUBSCRIPTIONS 226 2 227 3 227 2 229 208 225 4
INSURANCE 141 0 141 0 141 0 141 141 141 0
MEDICAL COSTS 349 1 350 0 352 (2) 351 238 354 (3)
LEGAL EXPENSES 192 0 168 0 180 (13) 167 79 180 (13)
HOSPITALITY / CIVIC RECOGNITION 30 1 31 0 29 2 31 17 29 2
PAYPOINT AGENCY FEES 70 0 70 0 75 (5) 70 60 75 (5)
SECURITY UPLIFT FEES 2 0 2 0 2 0 2 1 2 0
OTHER ADMIN COSTS 640 1 640 1 683 0 714 668 714 0
MEMBERS ALLOWANCES 1,846 24 1,846 24 1,783 64 1,847 1,443 1,786 61
CONFERENCES - MEMBERS (incl associated costs) 11 0 11 0 11 0 11 3 11 0
CONFERENCES - OFFICIALS (incl associated costs) 5 0 5 0 3 2 5 1 3 2
TRAINING 760 1 762 (1) 803 (42) 761 534 788 (27)
VOLUNTEERS' EXPENSES 7 0 7 0 8 0 8 7 8 0
INTERNAL SUPPORT SERVICES ALLOCATION 68 0 68 0 68 0 68 0 68 0
ADMINISTRATION 7,741 (40) 7,726 (25) 7,681 15 7,728 6,005 7,711 17
72

Page 73

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
PAYMENT TO OTHER BODIES
GRANTS TO VOLUNTARY ORGANISATIONS 678 0 678 0 572 106 678 485 572 106
PAYMENTS TO OTHER BODIES 2,686 67 2,698 64 2,722 54 2,776 2,290 2,732 44
EXTERNAL AUDIT FEES 726 (126) 600 0 637 0 637 323 637 0
PAYMENT TO OTHER BODIES 4,090 (59) 3,976 64 3,931 160 4,091 3,098 3,941 150
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 28 0 28 0 35 (7) 28 35 35 (7)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 243 1 243 0 249 (24) 225 250 252 (27)
PAYMENT TO CONTRACTORS 271 1 271 0 284 (31) 253 285 287 (34)
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 0 23,581 0 21,790 1,791 23,581 18,448 21,790 1,791
RENT REBATES 42,418 0 42,353 0 38,871 3,482 42,353 29,308 38,871 3,482
TRANSFER PAYMENTS 65,999 0 65,934 0 60,661 5,273 65,934 47,756 60,661 5,273
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 1,239 (26) 1,237 (26) 1,444 (40) 1,404 1,096 1,445 (41)
FINANCING CHARGES 1,239 (26) 1,237 (26) 1,444 (40) 1,404 1,096 1,445 (41)
TOTAL EXPENDITURE 124,179 (676) 123,996 (469) 120,057 5,769 125,856 93,796 119,936 5,920
INCOME
STATUTORY ADDITIONS - COST OF COLLECTION (1,085) 220 (1,085) 220 (1,110) 245 (865) 0 (1,110) 245
RENT REBATES SUBSIDY (37,191) 0 (37,191) 0 (33,763) (3,428) (37,191) (28,346) (33,763) (3,428)
RENT ALLOWANCE SUBSIDY (23,067) 0 (23,067) 0 (21,354) (1,713) (23,067) (16,310) (21,354) (1,713)
DWP SUBSIDY (1,170) 0 (1,170) 0 (1,181) 11 (1,170) (1,028) (1,209) 39
DHP (347) 0 (347) 0 (347) 0 (347) (347) (347) 0
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (150) 1 (150) 1 (150) 0 (150) (116) (150) 0
CONTRIBUTIONS FROM OTHER BODIES (320) 15 (320) 15 (262) (43) (305) (195) (262) (43)
SALES - DEPARTMENTS OF THE AUTHORITY (14) (6) (14) (6) (15) (5) (20) 0 (15) (5)
FEES AND CHARGES - GENERAL (4,774) 420 (4,774) 420 (4,733) 224 (4,507) (2,779) (4,481) (26)
CHARGES TO HEALTH BOARDS (45) 0 (45) 0 (45) 0 (45) 0 (45) 0
FEES AND CHARGES - OTHER BODIES (221) 0 (221) 0 (221) 0 (221) (191) (221) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,494) 6 (2,494) 6 (2,525) 37 (2,488) (1,685) (2,524) 36
HOME LOANS REPAYMENTS (4) 0 (4) 0 (5) 0 (5) (26) (5) 0
BIRTH REGISTRATION (16) (3) (16) (3) (16) 0 (16) (14) (16) 0
DEATH REGISTRATION (68) (5) (68) (5) (68) 0 (68) (52) (68) 0
MARRIAGE STATUTORY FEES (103) 8 (103) 8 (103) 0 (103) (93) (103) 0
EXTRACT ISSUE (79) (9) (79) (9) (79) 0 (79) (65) (79) 0
MARRIAGES (44) (5) (44) (5) (44) 0 (44) (39) (44) 0
CITIZENSHIP CEREMONIES (15) 4 (15) 4 (15) 0 (15) (16) (15) 0
CIVIL PARTNERSHIPS (1) 1 (1) 1 (1) 0 (1) 0 (1) 0
OTHER INCOME (6,728) 29 (6,536) (178) (6,446) (241) (6,687) (825) (6,518) (169)
REALLOCATION OF CENTRAL SUPPORT COSTS (6,668) 0 (6,668) 0 (6,668) 0 (6,668) 0 (6,668) 0
REALLOCATION OF SUPPORT COSTS (9) 0 (9) 0 (9) 0 (9) 0 (9) 0
INCOME (84,613) 676 (84,421) 469 (79,160) (4,913) (84,071) (52,127) (79,007) (5,064)
NET EXPENDITURE 39,566 0 39,575 0 40,897 856 41,785 41,669 40,929 856
73

Page 74

74

Page 75

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 24 January 2025 (No.11)
Housing and Technical Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Housing Services 9.182 8.678 0.504 5.49% 4.256
Property Services 5.909 5.708 0.201 3.40% 13.593
Total Housing and Technical Resources 15.091 14.386 0.705 4.67% 17.849
5
75

Page 76

Housing and Technical Resources (excl HRA) Variance Analysis 2024/25 (Period 11) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,973k
under
APT&C Basic / Overtime /
Superannuation / National Insurance
– 2,256k under
Property Services –
2,170k under 
The variance relates to
vacancies which are actively
being recruited in line with
Service requirements. 
Manual Basic / Overtime /
Superannuation / National Insurance
– (292k) over 
Property Services –
(283k) over 
The variance relates to the
current level of trade operatives
and overtime required to meet
service demands.   
Property Costs (1,351k)
over
Rates – 186k under  Property Services –
188k under 
The variance relates to lower
than budgeted rates charges for
Council properties mainly within
Office Accommodation. 
Scottish Water Charges –
unmetered/metered charges – (75k)
over 
Property Services –
(48k) over 
The overspend relates to
greater than budgeted water
charges within Estates. 
Rent (173k) over  Property Services –
(115k) over 
The overspend relates to an
increase in rent charges for
corporate buildings.  
Service Charges – (162k) over  Property Services -
(149k) over 
The overspend relates to the
cost of shopping centre service
charges which are not
recoverable from tenants. 
76

Page 77

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Other Accommodation – (90k) over  Housing Services –
(90k) over 
The forecast overspend is due
to greater than budgeted
temporary accommodation
rental costs. 
Bed & Breakfast – (154k) over  Housing Services –
(154k) over
The overspend relates to
greater than anticipated
demand for the service. 
Repairs & Maintenance/Life Cycle
Maintenance – (360k) over 
Housing Services (24k)
over 
Property Services -
(336k) over 
The overspend relates to
additional expenditure on the
maintenance of homelessness
property. 
The overspend relates to
additional expenditure on the
maintenance of the corporate
estate. 
Housing – Rent Write off Unlet
Periods/Bad Periods – 142k under 
Housing Services 96k
under 
The underspend is due to lower
than expected bad debt write
off within the Homelessness
service. 
Property Services –
46k under 
The underspend is due to lower
than expected bad debt write
off within the Estates service.   
Electricity – Contract/Non-Contract
(289k) over 
Housing Services –
(136k) over 
This relates to the current
market prices for utilities which
is higher than budget. 
77

Page 78

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.)   
Gas – 64k under 
Fixture & Fittings – (418k) over 
Other Property Costs – 134k under
Property Services -
(153k) over 
Property Services –
72k under 
Housing Services –
(418k) over 
Housing Services –
196k under 
Property Services –
(62k) over 
This relates to the current
market prices for utilities which
is higher than budget. 
The forecast underspend
relates to lower than anticipated
gas charges for corporate
buildings. 
This relates to the furniture
costs within homeless
temporary accommodation and
is demand led. 
The underspend relates to
additional funding received for
Ukraine Resettlement and due
to the timing of award, will be
transferred to reserves at the
end of the financial year. 
The overspend relates to
increased costs for
maintenance within corporate
buildings along with charges for
corporate buildings within
Estates service. 
Supplies &
Services
2,553k
under
Computer Equipment – Purchase and
Maintenance/IT Equipment
Maintenance and Electronic
Messaging – 64k under 
Property Services –
53k under 
The underspend is due to lower
than forecast expenditure on IT
system costs within Building
Services. 
78

Page 79

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies &
Services (cont.) 
Adaptations for Clients – 235k under  Property Services –
235k under 
The forecast underspend is due
to lower than budgeted Social
Work adaptation requests.  
Materials/Stock & Store Issues –
2,184k under
Property Services –
2,184k under 
Expenditure on materials varies
depending on the current
workload demands and timing
of works on a wide variety of
capital and revenue works. 
Transport & Plant  331k under   Purchase of Plant and Equipment –
(80k) over
Property Services –
(80k) over 
The overspend relates to the
replacement of tools within
Building Services. 
Pool Car Charges – Rental/Fuel – 80k
under 
Property Services - 79k
under 
The underspend relates to
lower than budgeted pool car
charges within the Estates team
due to a reduction in pool car
demand.  
Fleet Service Charges – Vehicle
Leasing – 84k under
Property Services - 79k
under was 
The forecast underspend
related to lower than budgeted
vehicle leasing charges within
Building Services Contracts
team. 
Hire of Scaffolding – 208k under  Property Services -
208k under 
Expenditure on hires varies
depending on the workload
demands and timing of works
on a wide variety of capital and
revenue works. 
79

Page 80

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to Other
Bodies
(271k) over Supporting People – 76k under  Housing Services –
76k under 
The underspend relates to
lower than budgeted
expenditure to support RSLs. 
Assistance to Homeowners – (230k)
over
Property Services –
(230k) over
This variance reflects the timing
of spend on grants to owners to
date. 
Payment to
Contractors
(5,129k)
over
Payment to Local Authority
Contractors/ Payment to Private
Contractors – (4,302k) over 
Housing Services –
123k under 
The underspend relates to
commissioned services in the
Homelessness budget where
expenditure varies according to
service requirements. 
Property Services –
(4,425k) over 
Expenditure on contractor
payments varies depending on
the current workload demands
and timing of works on a wide
variety of capital and revenue
works. 
Payment to External Consultants –
(827k) over 
Property Services –
(827k) over 
This overspend reflects the
requirement to purchase
external professional services
within the Projects team, to
meet current service demands. 
Income  2,746k over
recovered
Contributions from Other Bodies –
114k over recovered 
Housing Services –
114k over recovered 
The over recovery mainly
relates to external funding to
cover employee costs within
Homelessness. 
80

Page 81

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Rental Income – 140k over recovered  Property Services –
140k over recovered
This mainly relates to building
services income streams which
are variable each financial year
due to the demand for repair
requests.  
House Rents – 705k over recovered  Housing Services –
705k over recovered 
The over recovery relates to
more house rent income than
budgeted within the
Homelessness service.  
Other Income – (100k) under
recovered 
Property Services –
(100k) under recovered 
The under recovery is due to
lower than anticipated income
from Estates service and the
recovery of costs within the
Factoring service which is offset
by an underspend in
expenditure within the service. 
Recovery from Capital/Recharges -
Departments of the Authority – 1,950k
over recovered 
Property Services –
1,950k over recovered 
The level of income recovered
varies depending on the current
workload and the timing of a
wide variety of projects and is
offset by a reduction in
expenditure. 
* The underlined variances represent new variances since the last report.
81

Page 82

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
APT & C BASIC 16,790 307 15,023 2,074 16,152 1,548 17,704 12,554 15,893 1,811
APT & C OVERTIME 60 142 92 110 187 15 202 101 147 55
APT & C SUPERANNUATION 948 224 1,603 (431) 1,025 189 1,212 798 1,021 191
APT & C NIC 1,528 234 1,544 218 1,623 223 1,843 1,290 1,644 199
MANUAL BASIC 19,320 731 20,060 (9) 20,704 87 20,791 16,340 20,201 590
MANUAL OVERTIME 354 234 590 (2) 561 (73) 488 898 1,348 (860)
MANUAL SUPERANNUATION 1,636 (336) 1,235 65 1,344 4 1,348 1,050 1,339 9
MANUAL NIC 1,952 73 2,122 (97) 2,093 32 2,125 1,754 2,156 (31)
OTHER EMPLOYEE COSTS 496 (7) 494 (5) 819 (103) (13) (44) (10) (3)
PENSION INCREASES 621 (19) 628 (26) 570 (195) 593 546 594 (1)
ADDITIONAL PENSION COSTS 0 13 0 13 0 13 13 0 0 13
EMPLOYEE COSTS 43,705 1,596 43,391 1,910 45,078 1,740 46,306 35,287 44,333 1,973
PROPERTY COSTS
RATES 2,207 175 2,223 159 2,214 172 2,387 2,163 2,201 186
SCOTTISH WATER - UNMETERED CHARGES 26 (14) 26 (14) 20 (8) 12 20 26 (14)
SCOTTISH WATER - METERED CHARGES 288 (47) 287 (46) 326 (85) 241 236 302 (61)
RENT 1,744 (11) 1,864 (131) 1,853 (120) 1,733 1,700 1,906 (173)
SERVICE CHARGE 750 (311) 750 (311) 600 (161) 439 494 601 (162)
FACTORING CHARGES 9 0 9 0 0 9 9 0 0 9
OTHER ACCOMMODATION COSTS 2,550 124 2,550 124 2,764 (90) 2,674 607 2,764 (90)
BED AND BREAKFAST 175 (148) 175 (148) 181 (154) 27 71 181 (154)
PROPERTY INSURANCE 386 0 397 (11) 436 (50) 386 490 436 (50)
SECURITY COSTS 336 (43) 334 (70) 344 (49) 295 180 314 (19)
GROUND MAINTENANCE 52 0 52 0 52 0 52 53 54 (2)
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 0 10 0 5 5 10 6 5 5
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 3,350 (237) 3,162 (49) 3,476 (69) 3,407 4,716 3,588 (181)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 0 0 0 0 0 0 0 0 0 0
LIFE CYCLE MAINTENANCE 754 0 755 (1) 455 299 754 1,181 308 446
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 356 10 356 39 1,034 (661) 373 1,492 998 (625)
ADAPTIONS - INTERNAL CONTRACTORS 0 0 0 0 14 (14) 0 28 14 (14)
HOUSING - RENT FREE ACCOMMODATION 0 0 0 0 16 (16) 0 11 15 (15)
GAS MAINTENANCE COSTS 0 0 0 0 0 0 0 6 0 0
HOUSING - RENT W/O UNLET PERIODS 786 25 786 25 811 0 811 993 826 (15)
HOUSING - RENT W/O BAD PERIODS 580 148 580 148 578 150 728 2,376 571 157
VOID HOUSE REPAIRS 0 0 0 0 0 0 0 0 0 0
ASBESTOS 0 0 0 0 0 0 0 355 0 0
ELECTRICITY  - CONTRACT 1,557 (100) 1,557 (100) 1,678 (221) 1,457 1,421 1,749 (292)
ELECTRICITY  - NON CONTRACT 33 (4) 31 (2) 22 5 27 21 24 3
GAS 576 0 576 0 459 117 576 299 512 64
HEATING OIL 12 0 12 0 12 0 12 10 12 0
FIXTURE & FITTINGS 1,295 (126) 1,300 (131) 1,617 (448) 1,169 2,659 1,587 (418)
JANITOR SERVICE 164 0 152 12 152 12 164 152 152 12
CLEANING CONTRACT 407 0 407 0 404 3 407 398 386 21
CLEANING OUTWITH CONTRACT 0 0 0 0 0 0 0 9 0 0
CLEANING MATERIALS 10 0 10 0 4 6 10 4 4 6
HEALTH & HYGIENE MATERIALS 0 0 0 0 2 (2) 0 4 2 (2)
WINDOW CLEANING 2 0 2 0 2 0 2 1 2 0
PEST CONTROL 6 0 6 0 5 1 6 1 6 0
REFUSE UPLIFT 405 0 405 0 403 2 405 47 614 (209)
REMOVAL & STORAGE COSTS 47 1 47 1 128 (4) 49 20 57 (8)
OTHER PROPERTY COSTS 600 (44) 598 (42) 684 89 848 536 714 134
OFFICE ACCOM-FACILITIES MANAGEMENT 1,113 0 1,066 47 985 128 1,113 985 985 128
ACCOMMODATION RECHARGE TO USERS 51 (18) 51 (18) 51 (18) 33 43 51 (18)
PROPERTY COSTS 20,637 (620) 20,536 (519) 21,787 (1,172) 20,616 23,795 21,967 (1,351)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 439 9 439 9 169 279 448 143 390 58
COMPUTER EQUIPMENT MAINTENANCE 6 0 6 0 0 6 6 0 0 6
I.T. EQUIPMENT MAINT-CONTRACT 210 (1) 209 0 33 176 209 17 184 25
I.T. ELECTRONIC MESSAGING 0 0 0 0 0 43 43 1 41 2
EQUIPMENT, APPARATUS AND TOOLS 45 0 45 0 0 2 2 30 0 2
ADAPTATIONS FOR CLIENTS 500 0 500 0 323 177 500 239 265 235
FURNITURE - OFFICE 1 (1) 1 (1) 1 (1) 0 95 1 (1)
MATERIALS 11,926 158 10,336 1,748 11,032 1,041 12,073 4,514 9,889 2,184
STOCK/STORE ISSUES (1,503) 1,503 0 0 0 0 0 790 0 0
AUDIO VISUAL 10 0 10 0 0 10 10 0 0 10
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 0 2 0 2 0 2 2 0 0 2
TV LICENCES - EDUCATION 1 0 1 0 1 0 1 1 1 0
FOODSTUFFS - GENERAL 0 1 0 1 0 1 1 0 0 1
BEVERAGES 1 0 1 0 0 1 1 1 0 1
PROTECTIVE CLOTHING & UNIFORMS 45 (1) 45 (1) 4 40 44 22 41 3
OTHER SUPPLIES AND SERVICES 191 (11) 191 (11) 147 33 86 33 60 26
HEALTH AND SAFETY 1 0 1 0 1 0 1 0 1 0
CATERING - CONTRACT 0 1 0 1 0 1 1 0 0 1
MAJOR SUPPLY OF ELECTRICAL POWER 0 0 0 0 0 0 0 8 0 0
OUTSOURCED MAIL 3 (3) 4 (4) 2 (2) 0 22 2 (2)
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 (2) 0 0
SUPPLIES AND SERVICES 11,876 1,657 11,789 1,744 11,713 1,809 13,428 5,914 10,875 2,553
82

Page 83

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 0 0 107 125 187 (80)
PURCHASE OF PLANT 125 0 212 (87) 206 (82) 17 41 17 0
FLEET SERVICES - FUEL 1 0 1 0 1 0 1 4 2 (1)
POOL CAR RECHARGE - RENTAL CHARGE 54 44 53 45 49 49 98 22 37 61
POOL CAR RECHARGE - FUEL 11 15 11 15 9 17 26 0 7 19
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 1 0 1 0 1 0 1 0
OTHER TRANSPORT COSTS 0 0 0 0 0 0 0 95 0 0
TRANSPORT INSURANCE 44 0 44 0 44 0 44 0 44 0
PLANT SERVICES 7 0 7 0 7 0 1 2 1 0
FLEET SERVICE CHARGES VEHICLE MAINTENANCE 331 0 331 0 331 0 331 627 332 (1)
FLEET SERVICE CHARGES UNSCHEDULED LABOUR 1 0 1 0 1 0 0 0 0 0
FLEET SERVICE CHARGES PLANT MAINTENANCE 7 0 7 0 7 0 7 7 7 0
FLEET SERVICE CHARGES ASSET MODIFICATIONS 15 0 15 0 15 0 19 24 19 0
FLEET SERVICE CHARGES LEASING 1,397 5 1,397 5 1,333 69 1,398 711 1,314 84
FLEET SERVICE CHARGES HIRED VEHICLES 205 0 205 0 205 0 205 187 203 2
FLEET SERVICE CHARGES CONTRACT HIRE 46 2 48 0 24 24 48 40 26 22
FLEET SERVICE CHARGES ROAD FUND LICENCES/MOT 117 0 117 0 117 0 118 155 117 1
FLEET SERVICE CHARGES FUEL 842 0 840 2 841 1 841 608 837 4
HIRE OF EXTERNAL PLANT 256 1 256 1 257 0 244 59 244 0
HIRE OF SCAFOLDING 1,077 0 1,077 0 729 381 1,110 1,271 902 208
HIRE OF SKIPS 33 0 33 0 0 0 0 52 0 0
EXTERNAL TRANSPORT CONTRACT 0 0 0 0 0 0 0 3 0 0
TAXI CHARGES - CONTRACTED 41 0 42 (1) 42 (1) 41 21 30 11
TRANSPORT AND PLANT 4,611 67 4,698 (20) 4,219 458 4,677 4,078 4,346 331
ADMINISTRATION
PRINTING AND STATIONERY 80 (4) 80 (4) 83 (7) 76 70 80 (4)
TELEPHONES 92 2 93 1 89 5 93 56 91 2
MOBILE PHONES 40 0 40 0 35 5 40 3 35 5
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 0 7 0 7 0 7 7 0 0 7
ADVERTISING - OTHER 6 0 6 0 3 3 7 3 4 3
POSTAGES/COURIERS 35 (14) 38 (17) 22 (1) 20 22 21 (1)
MEMBERSHIP FEES/SUBSCRIPTIONS 12 0 12 0 13 (1) 12 428 117 (105)
INSURANCE 223 (7) 223 (7) 236 (20) 216 111 248 (32)
MEDICAL COSTS 16 0 17 (1) 17 (1) 17 36 18 (1)
LEGAL EXPENSES 11 (3) 11 (3) 19 (11) 8 11 15 (7)
PETTY OUTLAYS 12 0 12 0 12 0 12 11 12 0
HOSPITALITY / CIVIC RECOGNITION 2 0 2 0 2 0 2 0 2 0
BANK CHARGES 0 0 0 0 0 0 0 4 0 0
PAYPOINT AGENCY FEES 0 0 0 0 0 0 1 4 1 0
OTHER ADMIN COSTS 9 (1) 8 0 6 2 7 0 5 2
TRAINING 0 0 0 0 0 0 0 1 0 0
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 457 0 457 0 457 0 457 0
CENTRAL ADMINISTRATION 2,749 0 2,749 0 2,749 0 2,749 0 2,749 0
ADMINISTRATION 3,744 (20) 3,748 (24) 3,743 (19) 3,724 760 3,855 (131)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,019 0 2,019 0 2,019 0 1,948 213 2,039 (91)
OTHER LOCAL AUTHORITIES 0 0 0 0 0 0 0 222 0 0
PAYMENTS TO OTHER BODIES 949 (44) 949 (44) 867 38 1,416 1,026 1,449 (33)
SUPPORTING PEOPLE INTERNAL PROVIDER 1,211 (82) 1,211 (82) 1,211 (82) 1,129 1,025 1,211 (82)
SUPPORTING PEOPLE EXTERNAL PROVIDER 624 158 624 158 624 158 782 280 624 158
HOUSING ADMINISTRATION 885 0 885 0 885 0 885 (137) 885 0
ASSISTANCE TO HOME OWNERS 1,221 (130) 1,263 (172) 1,264 (173) 1,091 849 1,321 (230)
PRIVATE INDIVIDUALS - GENERAL 192 (24) 192 (24) 180 (12) 168 209 161 7
PAYMENT TO OTHER BODIES 7,101 (122) 7,143 (164) 7,050 (71) 7,419 3,687 7,690 (271)
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 0 0 0 0 0 0 0 22 0 0
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 14,553 (4,778) 9,775 10,563 14,200 (4,425)
PAYMENT TO PRIVATE CONTRACTOR 16,120 (4,050) 15,555 (3,485) 2,172 123 2,295 1,627 2,172 123
PAYMENT TO EXTERNAL CONSULTANTS 606 (300) 253 53 625 (319) 306 842 1,133 (827)
PAYMENT TO CONTRACTORS 16,726 (4,350) 15,808 (3,432) 17,350 (4,974) 12,376 13,054 17,505 (5,129)
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 156 (2) 164 (10) 135 19 154 22 170 (16)
INTEREST ON REVENUE BALANCES 2 0 2 0 2 0 2 0 2 0
FINANCING CHARGES 158 (2) 166 (10) 137 19 156 22 172 (16)
83

Page 84

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TOTAL EXPENDITURE 108,558 (1,794) 107,279 (515) 111,077 (2,210) 108,702 86,597 110,743 (2,041)
INCOME
CONTRIBUTIONS FROM OTHER BODIES (2,409) 24 (2,409) 24 (2,562) 177 (2,220) (6,370) (2,334) 114
SALES - DEPARTMENTS OF THE AUTHORITY (460) 0 (460) 0 (431) (29) (460) 0 (432) (28)
FEES AND CHARGES - GENERAL (711) 130 (703) 122 (538) (43) (581) (401) (542) (39)
FEES AND CHARGES - DEPARTMENTS OF THE A (48) 0 (46) (2) (46) (2) (48) 0 (46) (2)
RENTAL INCOME (3,927) (200) (3,927) (200) (4,267) 140 (4,127) (3,149) (4,267) 140
HOUSE RENTS (5,994) (213) (5,993) (214) (6,911) 704 (6,207) (5,361) (6,912) 705
INSURANCE RECOVERIES 0 0 0 0 0 0 0 1 0 0
OTHER INCOME (2,868) 121 (2,787) 40 (2,628) (126) (2,754) (1,860) (2,654) (100)
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 (876) 0 (876) 0 (1,219) 0 (1,219) 0
REALLOCATION OF SUPPORT COSTS (1,629) 0 (1,629) 0 (1,629) 0 (1,297) 0 (1,303) 6
RECOVERY FROM CAPITAL (28,144) (3,278) (21,582) (9,840) (15,623) (16,476) (32,088) (17,283) (22,000) (10,088)
RECHARGES - DEPARTMENTS OF AUTHORITY (47,102) 5,210 (52,477) 10,585 (61,180) 18,570 (42,610) (35,726) (54,648) 12,038
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 0 0 0 0 0 0 1,401 0 0
INCOME (94,168) 1,794 (92,889) 515 (96,691) 2,915 (93,611) (68,748) (96,357) 2,746
NET EXPENDITURE 14,390 0 14,390 0 14,386 705 15,091 17,849 14,386 705
84

Page 85

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2024/25 (Period 11)
Subjective Head Variance Subjective Line Service / Amount Explanation
Employee Costs (94k) over APT&C Basic / Overtime /
Superannuation / National
Insurance – (94k) over
HRA The overspend is a result
of the backfill of posts
covering seconded staff to
the One Housing IT
system project. 
Property Costs 445k under Grounds Maintenance –
442k under 
HRA The forecast underspend
is due to lower than
anticipated charges for
special uplifts. 
Repairs and Maintenance
– Internal and External
Contractor/ Life Cycle
Maintenance – (1,199k)
over 
HRA The overspend reflects
the current demand for
repairs and continuing
high cost of voids. The
position includes a
recharge for recovery of
costs from chargeable
services. 
5
85

Page 86

Subjective Head Variance Subjective Line Service / Amount Explanation
Property Costs (Cont.)  Housing – Rent Write off
Unlet Periods/Bad
Periods – 1,514k under 
HRA The net underspend
reflects a lower than
anticipated level of bad
debt provision. During the
year collection rates for
rental income have been
better than forecast,
which is due in part to
schemes such as the
tenancy sustainment fund
mitigating the overall level
of debt. 
Electricity/Gas – (276k)
over 
HRA The forecast overspend is
due to greater than
budgeted utility
expenditure on communal
areas within HRA. 
Fixtures & Fittings –
(126k) over
HRA  This budget is demand
led and the overspend
reflects the increased
demand during the year. 
Administration 125k under Printing & Stationery –
20k under
HRA  The forecast underspend
is due to lower than
anticipated printing and
stationery expenditure
being incurred. 
Postages – 70k under HRA The forecast underspend
is due to lower than
anticipated postages
costs being incurred. 
86

Page 87

Subjective Head Variance Subjective Line Service / Amount Explanation
Payment to Other Bodies (379k) over Payments to Other Bodies
– (382k) over 
HRA The overspend relates to
the payment to Actian for
the provision of support to
current IT systems. 
Financing Charges 161k under Interest on Revenue
Balances – 161k under 
HRA The level of interest
received reflects the level
of balances and interest
rates being higher than
anticipated.     
Income (283k) under recovered Sales – 242k over
recovered 
HRA  The over recovery is due
to income from the
provision of a factoring
service. 
Fees and Charges
General – 315k over
recovered 
HRA The over recovery reflects
greater than anticipated
income from rechargeable
repairs partially offset by
lower than budgeted
income from laundry
charges. 
House/Lock Up Rents –
1,370k over recovered
HRA The over recovery is due
to the timing of new builds
which completed ahead of
the anticipated profiles. 
Insurance Recoveries –
(565k) under recovered
HRA  The under recovery is due
to the settlement of the
severe weather insurance
claim being less than
anticipated.  
87

Page 88

Subjective Head Variance Subjective Line Service / Amount Explanation
Income (cont.)  Other Income – (93k)
under recovered 
HRA The closure of Lindsay
House has reduced
income, which is offset
with lower expenditure. 
Year End Transfer from
the Balance Sheet –
(1,552k) under recovered 
HRA The budget assumes a
level of transfer from
reserves, due to the
current net underspend
across the service. This is
mainly as a result of the
before mentioned level of
debt charges.
* The underlined variances represent new variances since the last report.
88

Page 89

Appendix E
Housing and Technical Resources - HRA Variance Analysis 2024/25 (Period 11)
Subjective Head Variance Subjective Line Service / Amount Explanation
Employee Costs (94k) over APT&C Basic / Overtime /
Superannuation / National
Insurance – (94k) over
HRA The overspend is a result
of the backfill of posts
covering seconded staff to
the One Housing IT
system project. 
Property Costs 445k under Grounds Maintenance –
442k under 
HRA The forecast underspend
is due to lower than
anticipated charges for
special uplifts. 
Repairs and Maintenance
– Internal and External
Contractor/ Life Cycle
Maintenance – (1,199k)
over 
HRA The overspend reflects
the current demand for
repairs and continuing
high cost of voids. The
position includes a
recharge for recovery of
costs from chargeable
services. 
89

Page 90

Subjective Head Variance Subjective Line Service / Amount Explanation
Property Costs (Cont.)  Housing – Rent Write off
Unlet Periods/Bad
Periods – 1,514k under 
HRA The net underspend
reflects a lower than
anticipated level of bad
debt provision. During the
year collection rates for
rental income have been
better than forecast,
which is due in part to
schemes such as the
tenancy sustainment fund
mitigating the overall level
of debt. 
Electricity/Gas/Solid Fuel
– (276k) over 
HRA The forecast overspend is
due to greater than
budgeted utility
expenditure on communal
areas within HRA. 
Fixtures & Fittings –
(126k) over
HRA  This budget is demand
led and the overspend
reflects the increased
demand during the year. 
Administration 125k under Printing & Stationery –
20k under
HRA  The forecast underspend
is due to lower than
anticipated printing and
stationery expenditure
being incurred. 
Postages – 70k under HRA The forecast underspend
is due to lower than
anticipated postages
costs being incurred. 
90

Page 91

Subjective Head Variance Subjective Line Service / Amount Explanation
Payment to Other Bodies (379k) over Payments to Other Bodies
– (382k) over 
HRA The overspend relates to
the payment to Actian for
the provision of support to
current IT systems. 
Financing Charges 161k under Interest on Revenue
Balances – 161k under 
HRA The level of interest
received reflects the level
of balances and interest
rates being higher than
anticipated.     
Income (283k) under recovered Sales – 242k over
recovered 
HRA  The over recovery is due
to income from the
provision of a factoring
service. 
Fees and Charges
General – 315k over
recovered 
HRA The over recovery reflects
greater than anticipated
income from rechargeable
repairs partially offset by
lower than budgeted
income from laundry
charges. 
House/Lock Up Rents –
1,370k over recovered
HRA The over recovery is due
to the timing of new builds
which completed ahead of
the anticipated profiles. 
Insurance Recoveries –
(565k) under recovered
HRA  The under recovery is due
to the settlement of the
severe weather insurance
claim being less than
anticipated.  
91

Page 92

Subjective Head Variance Subjective Line Service / Amount Explanation
Income (cont.)  Other Income – (93k)
under recovered 
HRA The closure of Lindsay
House has reduced
income, which is offset
with lower expenditure. 
Year End Transfer from
the Balance Sheet –
(1,552k) under recovered 
HRA The budget assumes a
level of transfer from
reserves, due to the
current net underspend
across the service. This is
mainly as a result of the
before mentioned level of
debt charges.
* The underlined variances represent new variances since the last report.
92

Page 93

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 24 January 2025 (No.11)
Social Work Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Performance and Support Services 6.067 5.973 0.094 1.55% 4.542
Children and Families 49.098 48.768 0.330 0.67% 38.444
Adults and Older People 181.164 180.814 0.350 0.19% 137.526
Justice and Substance Misuse 0.839 0.424 0.415 49.46% 0.700
Total Social Work Resources 237.168 235.979 1.189 0.50% 181.212
5
93

Page 94

Social Work Resources Variance Analysis 2024/25 (Period 11) 
Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs  2,243k under  Admin & Clerical Staff – 603k under 
Managerial Support Specialist Staff -
(1,303k) over 
Performance and
Support – 164k under 
Adult and Older People –
282k under 
Justice – 64k under 
Performance and
Support – (147k) over 
Children and Families –
300k under 
The underspend relates to
staffing vacancies which are
being filled. 
This relates to underspends to
Scheduling Assistant vacancies
in Homecare, which are being
recruited. This is offset by
overtime costs for Managerial
Support Specialist Staff (below). 
In addition, funding allocated for
staffing required at the end of the
A2D capital programme is only
required in part in 24/25 but
required in full in 25/26. 
The underspend relates to
staffing vacancies which are
being filled. 
This overspend is a result of
turnover being less than
anticipated to date and
anticipated overtime spend. 
This is a result of vacancies
which are actively being
recruited. 
94

Page 95

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.)     
Basic Grade Social Workers – 2,098k
under 
Instructors – 400k under 
Care Staff – (503k) over 
Adult and Older People –
(1,741k) over 
Justice – 200k under 
Children and Families 
- 644k under 
Adult and Older People –
1,379k under 
Justice – 93k under 
Adult and Older People – 
350k under 
Children and Families –
(127k) over 
This overspend is a result of
turnover being less than
anticipated to date, and overtime
spend to cover the Scheduling
Assistant vacancies in Homecare
(above). 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are being actively
recruited. 
This overspend is due to the level
of overtime being incurred to
manage staff absences due to
sickness and maternity leave. 
95

Page 96

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.)    
Home Carers – 870k under 
Other Employee Costs – 86k under
Adult and Older People –
(414k) over 
Adult and Older People –
889k under 
Justice – 70k under
This overspend is due to
overtime worked because of In
House Residential vacancies. 
This is a result of vacancies
which are being actively
recruited. 
This is a result of vacancies
which are being actively
recruited.
Property Costs 139k under Rates – (105k) over 
Gas – 385k under 
Adult and Older People –
(101k) over 
Adult and Older People –
383k under
Additional rates expected for
closed centres that previously
had 100% relief. 
The underspend reflects a
reduction in consumption and
price. 
Supplies and
Services 
(5k) over  Aids for Clients – (50k) over 
Adaptations for Clients – (89k) over 
Adult and Older People –
(50k) over 
Adult and Older People –
(89k) over 
This overspend is due to an
increase in substantial
assessments being actioned. 
This overspend reflects demand
for ceiling tracks and stairlifts. 
96

Page 97

Subjective Head Variance Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
Supplies for Clients – 104k under 
Protective Clothing & Uniforms – 75k
under 
Children & Family – 81k 
under 
Adult and Older People –
91k under 
This is a demand led budget and
primarily relates to the Family
Hubs and is dependent on the
people who present at the hubs
and the courses organised each
year. This will offset the
overspend in Section Payments. 
This underspend reflects reduced
level of Homecare uniform
orders, in addition to budget for
A2D Sims and broken devices
not required. 
Transport and
Plant 
(549k) over Pool Car Recharge – Rental Charges –
(103k) over 
Fleet Service Charges - (447k) over 
Children and Families –
(126k) over 
Performance and
Support – 76k under 
Adult and Older People –
(479k) over 
The overspend reflects increases
in demand. 
The underspend is due to a
reduction in driver spend as a
result of reduced services. 
The projected overspend reflects
the current spend on Fleet buses
however, an action plan is in
place to reduce spend. This will
continue to be monitored. 
Administration  (250k) over  Mobile Phones – (140k) over  Adult and Older People –
(148k) over 
The overspend relates to
additional one-off costs required
for the replacement of mobiles
devices. 
97

Page 98

Subjective Head Variance Subjective line Service / amount Explanation
Administration
(cont.)   
Legal Expenses – (69k) over  Adult and Older People –
(69k) over
The overspend is a result of the
level of legal costs, mainly in
relation to Adults with Incapacity
and guardianship orders.
Payment to Other
Bodies 
424k under  Payments to Other Bodies – 259k
under 
Private Individuals – General – 123k
under 
Social Work - Foster Parents – (125k)
over 
Social Work - Adoption Allowance –
Default – (228k) over 
Direct Payments – 368k under 
Children and Families –
225k under 
Children and Families –
135k under 
Children and Families –
(125k) over 
Children and Families –
(228k) over 
Adult and Older People –
368k under 
This underspend is planned as
part of the budget recovery plan
within Children and Family. 
There has been a reduction in the
number of supported carers and
the service has a planned
recruitment drive to attract new
carers. 
The overspend is attributable to
the requirement to purchase
external foster placements. 
This overspend relates to the
number of adoptive carers being
paid an ongoing adoption
allowance. The scheme is
currently being reviewed. 
The underspend reflects current
demand of Direct Payments.
98

Page 99

Subjective Head Variance Subjective line Service / amount Explanation
Payment to
Contractors 
157k under  Payment to Private Contractor – 100k
under 
Payment to Vol Orgs – Care Element –
731k under 
Secure Accommodation – (463k) over 
Home Support – (143k) over 
Groupwork/Social Support – (92k) over 
Adult and Older People –
101k under 
Children and Families –
712k under 
Children and Families –
(463k) over 
Adult and Older People –
(143k) over 
Adult and Older People –
(92k) over 
The non-recurring underspend
relates to unused Mental Health
recommission monies. 
This underspend is being used to
fund the overspend in secure
accommodation. The underspend
is due to non-recurring funding
solutions as part of the budget
recovery plan. 
This is due to the number of
children currently in secure
accommodation. 
This overspend reflects the
demand for the service. 
The overspend reflects additional
demand for services. 
Transfer
Payments 
(1,264k) over  Direct Assistance to Persons – (1,177k)
over 
Section Payments – (87k) over 
Children and Families –
(1,161k) over 
Children and Families –
(82k) over 
This overspend relates to the
payment of kinship care
allowances, where demand is
increasing. 
This overspend is due to an
increasing number of families
presenting with no recourse to
public funding. 
99

Page 100

* The underlined variances represent new variances since the last report. 
Subjective Head Variance Subjective line Service / amount Explanation
Income  304k over
recovered
Contributions From Other Bodies -
Default – 299k over recovered 
Fees and Charges – General – 75k
over recovered 
Children and Families –
299k over recovered 
Children and Families –
40k over recovered 
Adult and Older People –
35k over recovered 
This over recovery is due to the
level of Unaccompanied Asylum-
Seeking Children (UASC) income
being received for children
seeking asylum. 
This income relates to unused
Direct Payments which were not
required by the Service Users
and therefore paid back to the
Council. 
This income over recovery
relates to fees received from
community alert alarms. 
100

Page 101

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Social Work Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
EMPLOYEE COSTS
ADMIN & CLERICAL STAFF - APT&C BASIC 5,364 516 5,194 680 5,405 749 6,166 4,278 5,401 765
ADMIN & CLERICAL STAFF - APT&C OVERTIME 184 (184) 184 (184) 226 (226) 0 153 229 (229)
ADMIN & CLERICAL STAFF - APT&C SUPERANNUATION 316 70 381 6 362 42 406 273 333 73
ADMIN & CLERICAL STAFF - APT&C NIC 438 (3) 457 (22) 483 (27) 457 362 463 (6)
MANAGERIAL SUPPORT SPECIALIST STAFF BASIC 25,118 (892) 24,939 (964) 25,684 (520) 25,115 20,607 25,687 (572)
MANAGERIAL SUPPORT SPECIALIST STAFF OVERTIME 625 (579) 637 (591) 786 (740) 46 493 774 (728)
MANAGERIAL SUPPORT SPECIALIST STAFF SUPERANNUATION 1,501 126 1,481 147 1,609 73 1,703 1,281 1,606 97
MANAGERIAL SUPPORT SPECIALIST STAFF NIC 2,634 (84) 2,646 (97) 2,687 (54) 2,672 2,254 2,772 (100)
BASIC GRADE SOCIAL WORKERS BASIC 12,333 1,507 12,384 1,591 12,483 1,799 14,223 10,095 12,363 1,860
BASIC GRADE SOCIAL WORKERS OVERTIME 99 (55) 100 (56) 153 (109) 44 99 159 (115)
BASIC GRADE SOCIAL WORKERS SUPERANNUATION 692 268 714 255 803 189 988 629 797 191
BASIC GRADE SOCIAL WORKERS NIC 1,248 220 1,306 176 1,355 182 1,530 1,095 1,368 162
HOSPITAL SOCIAL WORKERS BASIC 0 0 (72) 72 (24) 25 1 0 0 1
HOSPITAL SOCIAL WORKERS OVERTIME 0 0 (1) 1 (1) 1 0 0 0 0
HOSPITAL SOCIAL WORKERS SUPERANNUATION 0 0 (8) 8 (4) 4 0 0 0 0
HOSPITAL SOCIAL WORKERS NIC 0 0 (3) 3 (3) 3 0 0 0 0
INSTRUCTORS BASIC 1,223 290 1,202 310 1,267 309 1,576 1,000 1,226 350
INSTRUCTORS SUPERANNUATION 70 28 61 37 80 22 102 62 78 24
INSTRUCTORS NIC 110 26 115 21 119 22 141 91 115 26
CARE STAFF - APT&C BASIC 16,769 (284) 16,630 (127) 17,457 (95) 17,362 13,900 17,360 2
CARE STAFF - APT&C OVERTIME 1,017 (530) 1,015 (545) 1,067 (562) 505 778 996 (491)
CARE STAFF - APT&C SUPERANNUATION 947 85 995 37 1,073 16 1,089 862 1,068 21
CARE STAFF - APT&C NIC 1,589 (1) 1,610 (22) 1,701 (24) 1,677 1,385 1,712 (35)
HOME CARERS BASIC 27,392 691 27,693 389 28,675 579 29,488 22,127 28,607 881
HOME CARERS OVERTIME 1,635 (454) 1,258 (77) 1,145 36 1,126 1,187 1,145 (19)
HOME CARERS SUPERANNUATION 1,634 132 1,450 316 1,710 127 1,765 1,329 1,701 64
HOME CARERS NIC 2,657 106 2,690 73 2,797 77 2,767 2,254 2,823 (56)
TRAVEL AND SUBSISTENCE 0 0 0 0 3 (3) 0 2 3 (3)
OTHER EMPLOYEE COSTS 3,588 (8) 3,473 9 501 37 656 355 570 86
PENSION INCREASES 328 0 328 0 334 (6) 328 264 334 (6)
EMPLOYEE COSTS 109,511 991 108,859 1,446 109,933 1,926 111,933 87,215 109,690 2,243
PROPERTY COSTS
RATES 395 (40) 396 (41) 465 (105) 360 354 465 (105)
SCOTTISH WATER - UNMETERED CHARGES 35 0 35 0 6 0 6 0 6 0
SCOTTISH WATER - METERED CHARGES 162 (11) 164 (13) 215 (29) 186 149 215 (29)
RENT 523 0 528 (5) 573 (29) 544 426 573 (29)
SERVICE CHARGE 0 1 0 0 0 0 0 0 0 0
PROPERTY INSURANCE 292 0 292 0 292 0 292 296 292 0
SECURITY COSTS 5 (3) 7 (5) 13 (11) 2 13 13 (11)
GROUND MAINTENANCE 0 0 0 0 0 0 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 4 (2) 20 (18) 21 (19) 2 43 33 (31)
LIFE CYCLE MAINTENANCE 1 (1) 3 (3) 1 (1) 0 6 1 (1)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 73 (23) 75 (25) 67 (15) 50 61 69 (19)
HOUSING - RENT FREE ACCOMODATION 0 0 0 0 (55) 0 (55) 0 (55) 0
GAS HEATING 0 0 0 0 0 0 0 1 0 0
FIXED ELECTRICAL 0 0 1 (1) 0 0 0 0 0 0
ELECTRICITY  - CONTRACT 788 (31) 790 (33) 772 5 776 440 772 4
GAS 590 341 584 348 559 385 944 266 559 385
FIXTURE & FITTINGS 0 0 1 (1) 11 (1) 10 4 11 (1)
JANITOR SERVICE 0 0 1 (1) 5 (5) 0 6 5 (5)
CLEANING CONTRACT 374 0 374 0 384 (9) 375 376 384 (9)
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 193 (2) 194 (3) 114 7 121 75 114 7
HEALTH & HYGIENE MATERIALS 93 4 102 (5) 98 (3) 95 79 98 (3)
WINDOW CLEANING 11 (1) 10 0 10 0 10 6 10 0
REFUSE UPLIFT 43 (3) 42 (2) 40 0 40 34 40 0
REMOVAL & STORAGE COSTS 8 (7) 10 (9) 10 (9) 1 25 10 (9)
OTHER PROPERTY COSTS 203 (39) 171 (7) 165 (8) 157 58 162 (5)
PROPERTY COSTS 3,793 183 3,800 176 3,766 153 3,916 2,718 3,777 139
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 755 (2) 763 (10) 744 9 753 744 744 9
COMPUTER EQUIPMENT MAINTENANCE 39 1 39 0 17 18 35 9 17 18
I.T. EQUIPMENT MAINT-CONTRACT 199 0 199 0 192 11 204 15 192 12
I.T. ELECTRONIC MESSAGING 97 0 97 0 119 (22) 97 0 119 (22)
EQUIPMENT, APPARATUS AND TOOLS 110 1 117 (6) 89 23 112 52 89 23
SMALL TOOLS 4 0 3 1 4 0 3 3 4 (1)
AIDS FOR CLIENTS 874 (1) 873 0 1,025 (150) 875 488 925 (50)
ADAPTATIONS FOR CLIENTS 964 (1) 924 39 1,007 11 1,018 764 1,107 (89)
SUPPLIES FOR CLIENTS 356 0 360 (4) 251 105 356 192 252 104
FURNITURE - OFFICE 1 0 2 (1) 8 (7) 1 7 8 (7)
FURNITURE - GENERAL 0 0 0 0 1 (1) 0 1 1 (1)
FURNISHINGS (INCL. CROCKERY & LINEN) 15 0 19 (3) 22 (7) 15 16 22 (7)
MATERIALS 10 0 10 0 4 6 10 1 4 6
MATERIALS, APPARATUS AND EQUIPMENT 2 (1) 4 (3) 10 (8) 3 13 10 (7)
PROVISIONS - GENERAL 212 (2) 214 (4) 226 (14) 212 116 226 (14)
FOOD PURCHASES WITHIN CONTRACT SERVICE 451 (26) 452 (27) 456 (31) 426 357 456 (30)
FOOD PURCHASES OUTWITH CONTRACT SERVICE 0 0 0 0 0 0 0 2 0 0
BEVERAGES 52 (2) 52 (2) 50 0 50 32 50 0
SCHOOL MILK 35 (2) 35 (2) 38 (5) 33 28 38 (5)
PROTECTIVE CLOTHING & UNIFORMS 1,160 (14) 1,169 (23) 1,163 52 1,216 714 1,141 75
LAUNDRY COSTS 3 0 3 0 16 (13) 3 14 16 (13)
OTHER SUPPLIES AND SERVICES 50 (5) 68 (23) 67 (20) 46 52 66 (20)
CATERING - CONTRACT 372 0 372 0 358 9 367 344 358 9
CATERING - OUTWITH CONTRACT 53 (1) 52 0 35 7 42 17 35 7
OUTSOURCED MAIL 0 0 1 (1) 1 (1) 0 1 1 (1)
DELIVERY CHARGE 0 0 0 0 1 (1) 0 9 1 (1)
I- PROCUREMENT ERRORS 0 0 2 (2) 0 0 0 1 0 0
SUPPLIES AND SERVICES 5,814 (55) 5,830 (71) 5,904 (29) 5,877 3,993 5,882 (5)
101

Page 102

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Social Work Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 4 (4) 5 (5) 6 (6) 0 13 6 (6)
FLEET SERVICES - VEHICLE HIRE 0 0 1 (1) 0 0 0 0 0 0
POOL CAR CHARGES-RENTAL 255 (100) 255 (100) 272 (103) 169 209 272 (103)
POOL CAR CHARGES-FUEL 19 0 19 0 1 15 16 0 1 15
POOL CAR CHARGES-ADDITIONAL COSTS 3 0 3 0 0 3 3 0 0 3
OTHER TRANSPORT COSTS 978 (39) 961 (22) 939 0 939 570 939 0
INSURANCE 24 0 24 0 24 0 24 21 24 0
FLEET SERVICE CHARGES 3,939 (792) 3,950 (803) 3,668 (445) 3,223 3,383 3,670 (447)
HIRE OF EXTERNAL VEHICLES 7 0 7 0 0 7 7 0 0 7
HIRE OF EXTERNAL PLANT 0 0 0 0 0 0 0 1 0 0
HIRE OF SKIPS 0 0 0 0 1 (1) 0 1 1 (1)
EXTERNAL TRANSPORT CONTRACT 0 0 9 (9) 12 (12) 0 12 12 (12)
PUPIL TRANSPORT - STRATHCLYDE PASS 0 0 4 (4) 5 (5) 0 15 5 (5)
PUPIL TRANSPORT - OTHER 10 0 10 0 10 0 10 10 10 0
TRANSPORT AND PLANT 5,239 (935) 5,248 (944) 4,938 (547) 4,391 4,235 4,940 (549)
ADMINISTRATION
PRINTING AND STATIONERY 98 (1) 99 (2) 100 (3) 96 70 100 (4)
TELEPHONES 203 (1) 207 (5) 197 6 203 102 197 6
MOBILE PHONES 438 (153) 438 (153) 426 (140) 286 11 426 (140)
ADVERTISING - RECRUITMENT 4 0 4 0 4 0 4 0 4 0
ADVERTISING - OTHER 10 0 10 0 7 3 11 0 7 4
POSTAGES/COURIERS 53 0 53 0 53 0 53 42 53 0
SMS MESSAGING 0 0 0 0 1 0 1 1 1 0
MEMBERSHIP FEES/SUBSCRIPTIONS 53 0 62 (9) 61 (8) 53 47 61 (8)
INSURANCE 27 0 27 0 27 0 27 27 27 0
MEDICAL COSTS 27 (1) 61 (35) 63 (35) 28 61 63 (35)
LEGAL EXPENSES 299 (2) 302 (5) 366 (69) 297 225 366 (69)
HOSPITALITY / CIVIC RECOGNITION 5 0 5 0 2 (1) 2 2 2 0
SECURITY UPLIFT FEES 0 0 1 (1) 1 (1) 0 1 1 (1)
OTHER ADMIN COSTS 55 0 56 (1) 51 3 53 28 51 2
CONFERENCES - OFFICIALS (incl associated costs) 7 0 7 0 5 2 7 0 5 2
TRAINING 44 0 44 0 51 (7) 44 35 51 (7)
INTERNAL SUPPORT SERVICES ALLOCATION 410 0 410 0 410 0 410 0 410 0
ADMINISTRATION 1,733 (158) 1,786 (211) 1,825 (250) 1,575 652 1,825 (250)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 55 0 55 0 55 0 55 0 55 0
OTHER LOCAL AUTHORITIES 25 0 25 0 25 0 25 0 25 0
GRANTS TO VOLUNTARY ORGANISATIONS 23 0 23 0 23 0 23 18 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 2,107 141 2,115 133 2,190 28 2,216 1,500 2,189 27
PAYMENTS TO OTHER BODIES 2,107 197 2,122 182 2,029 259 2,288 1,232 2,029 259
PAYMENTS TO HEALTH BOARD 1,515 (7) 1,508 0 1,508 0 1,508 1,352 1,508 0
PRIVATE INDIVIDUALS - GENERAL 951 151 966 136 996 123 1,119 757 996 123
SOCIAL WORK - FOSTER PARENTS 6,792 (264) 6,661 (128) 6,731 (125) 6,606 5,381 6,731 (125)
SOCIAL WORK - FOSTER PARENTS DISCRETIONARY PAYMENTS 94 0 94 0 94 0 94 60 94 0
SOCIAL WORK - ADOPTION ALLOWANCES 858 (208) 858 (208) 858 (208) 650 844 878 (228)
DIRECT PAYMENTS 10,530 348 10,522 356 10,554 332 10,886 8,538 10,518 368
PAYMENT TO OTHER BODIES 25,057 358 24,949 471 25,063 409 25,470 19,682 25,046 424
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 6 (6) 6 (6) 6 (6) 0 6 6 (6)
PAYMENT TO PRIVATE CONTRACTOR 2,205 0 2,161 (1) 551 195 701 187 601 100
PAYMENT TO PRIVATE CONTRACTOR - CLIENTS REQS 0 0 0 0 0 0 0 50 0 0
PAYMENT TO PRIVATE CONTRACTOR - MISC 0 0 0 0 0 0 0 (6) 0 0
PAYMENT TO PRIVATE CONTRACTOR - PAYMENTS TO VOL ORGS 74,327 (22) 73,913 (343) 73,003 1,118 73,668 64,116 72,937 731
PAYMENT TO PRIVATE CONTRACTOR - CET ALLOCATION - HOME CARE 33,846 0 33,489 (1) 33,357 (298) 33,060 21,241 33,060 0
PAYMENT TO PRIVATE CONTRACTOR - SECURE ACCOMMODATION 615 0 615 0 1,165 (550) 657 979 1,120 (463)
PAYMENT TO PRIVATE CONTRACTOR - RESPITE 2,046 0 2,046 0 2,198 0 2,198 454 2,198 0
PAYMENT TO PRIVATE CONTRACTOR - DAY CARE 1,144 (68) 1,459 (120) 1,341 (2) 1,339 1,030 1,341 (2)
PAYMENT TO PRIVATE CONTRACTOR - HOME SUPPORT 22,905 297 23,745 307 24,617 (208) 24,409 18,833 24,552 (143)
PAYMENT TO PRIVATE CONTRACTOR - EMPLOYMENT TRAINING 55 0 55 0 57 (2) 55 42 57 (2)
PAYMENT TO PRIVATE CONTRACTOR - DIRECT PAYMENTS 0 0 0 0 12 0 12 9 12 0
PAYMENT TO PRIVATE CONTRACTOR - FREE PERSONAL NURSING CARE 9,135 0 9,135 0 9,135 0 9,588 7,384 9,589 (1)
PAYMENT TO PRIVATE CONTRACTOR - C & F - OUT OF SCHOOL SERVICE 18 0 18 0 25 0 25 7 25 0
PAYMENT TO PRIVATE CONTRACTOR - P.A. (COLLEGE) 260 0 280 0 416 35 451 347 424 27
PAYMENT TO PRIVATE CONTRACTOR - GROUPWORK/SOCIAL SUPPORT 1,030 0 1,030 0 1,171 (122) 1,049 808 1,141 (92)
PAYMENT TO PRIVATE CONTRACTOR - CARER RESPITE 418 0 419 0 419 0 419 323 419 0
PAYMENT TO PRIVATE CONTRACTOR - REFUSE DISPOSAL 3 (3) 2 (2) 2 (2) 0 2 2 (2)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 116 (1) 116 (1) 105 10 115 79 105 10
SLC MANAGED 0 0 0 0 0 0 0 0 0 0
PAYMENT TO CONTRACTORS 148,129 197 148,489 (167) 147,580 168 147,746 115,899 147,589 157
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 4,641 (1,069) 4,748 (1,176) 4,752 (1,177) 3,575 3,828 4,752 (1,177)
SECTION PAYMENTS 31 0 34 (3) 118 (87) 31 82 118 (87)
TRANSFER PAYMENTS 4,672 (1,069) 4,782 (1,179) 4,870 (1,264) 3,606 3,910 4,870 (1,264)
102

Page 103

South Lanarkshire Council
Period 7 Period 7 Period 8 Period 8 Period 10 Period 10 Revised Period 11 Period 11 Period 11
Social Work Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2024/2025 Outturn) Outturn) Outturn) 24/25 Outturn)
FINANCING CHARGES
LEASING CHARGES - FINANCE 1 0 0 1 1 0 1 0 1 0
LEASING CHARGES - OPERATIONAL (1) 0 39 (40) 0 (1) (1) 0 0 (1)
I.T. EQUIPMENT LEASING-CONTRACT 394 (1) 356 37 402 (9) 393 31 402 (9)
FINANCING CHARGES 394 (1) 395 (2) 403 (10) 393 31 403 (10)
TOTAL EXPENDITURE 304,342 (489) 304,138 (481) 304,282 556 304,907 238,335 304,022 885
INCOME
NON RELEVANT GOVERNMENT GRANT (8,510) 0 (8,510) 0 (8,309) (120) (8,497) (5,852) (8,498) 1
RESOURCE TRANSFER INCOME FROM THE HEALTH BOARD (25,039) 0 (25,039) 0 (25,039) 0 (25,039) (18,776) (25,039) 0
51000-CONTRIBUTIONS FROM OTHER LOCAL 0 0 (276) 0 0 0 0 0 0 0
CONTRIBUTIONS FROM OTHER BODIES (1,097) 290 (1,097) 290 (1,059) 299 (760) (759) (1,059) 299
SALES - SALE OF MEALS (24) 10 (31) 17 (34) 20 (14) (32) (34) 20
FEES AND CHARGES - GENERAL (7,095) 167 (6,843) 191 (7,452) 524 (6,928) (6,827) (7,003) 75
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (639) 0 (444) 1 (418) (25) (444) (81) (418) (26)
CHARGES TO HEALTH BOARDS (25,932) 0 (25,932) 0 (25,273) 0 (25,273) (24,691) (25,273) 0
FEES AND CHARGES - OTHER BODIES (4) 0 (4) 0 0 (4) (4) 0 0 (4)
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (218) 0 (178) (40) (178) (40) (218) 0 (178) (40)
RENTAL INCOME (27) 0 (27) 0 (27) 0 (27) (20) (27) 0
OTHER INCOME (157) 22 (154) 19 (114) (21) (135) (85) (114) (21)
REALLOCATION OF SUPPORT COSTS (400) 0 (403) 3 (400) 0 (400) 0 (400) 0
INCOME TOTAL (69,142) 489 (68,938) 481 (68,303) 633 (67,739) (57,123) (68,043) 304
NET EXPENDITURE 235,200 0 235,200 0 235,979 1,189 237,168 181,212 235,979 1,189
103

Page 104

104