Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 22 April 2026 
Dear Councillor 
Financial Resources Scrutiny Forum 
The Members listed below are requested to attend a meeting of the above Forum to be held
as follows:- 
Date:  Thursday, 30 April 2026
Time:  14:00
Venue: Council Chamber, Council Offices, Almada Street, Hamilton, ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members
Grant Ferguson (Chair), Julia Marrs (Depute Chair), Mathew Buchanan, Colin Dewar, Monique
Equi, Ross Gowland, Gavin Keatt, Richard Lockhart, Carol Nugent 
Substitutes
Archie Buchanan, Elise Frame, Celine Handibode, Susan Kerr
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Financial Resources Scrutiny Forum held on 12
March 2026 submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Monitoring 
3 Capital Budget Monitoring 2025/2026 - General Fund Capital Programme
Report dated 23 March 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
7 - 26 
4 Capital Budget Monitoring 2025/2026 - Housing Capital Programme
Report dated 23 March 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
27 - 32 
5 Revenue Budget Monitoring 2025/2026
Report dated 13 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
33 - 38 
6 Revenue Budget Monitoring 2025/2026 - Detailed Resource Analysis
Report dated 13 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
39 - 104 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
2

Page 3

FINANCIAL RESOURCES SCRUTINY FORUM 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 12 March 2026 
Chair:
Councillor Grant Ferguson 
Councillors Present:
Councillor Colin Dewar, Councillor Ross Gowland, Councillor Richard Lockhart, Councillor Julia
Marrs (Depute), Councillor Carol Nugent 
Councillors’ Apologies:
Councillor Mathew Buchanan, Councillor Monique Equi, Councillor Gavin Keatt 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); C Lyon, Administration Officer; A Norris, Administration
Assistant; L O’Hagan, Head of Finance (Strategy)
Housing and Technical Resources
A Roxburgh, Project Manager 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Financial Resources Scrutiny Forum held on 12 February
2026 were submitted for approval as a correct record. 
The Forum decided: that the minutes be approved as a correct record. 
3a Capital Budget Monitoring 2025/2026 – General Fund Capital Programme 
A report dated 23 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the General Fund Capital Programme 2025/2026 for the period
1 April to 23 January 2026. 
The revised General Services Capital Programme for 2025/2026 totalled £67.712 million, as
detailed in Appendix A to the report.  The revised programme consisted of the base budget plus
carry forward projects and adjustments which had been agreed by the Executive Committee up
to and including its meeting on 4 March 2026. 
Education Resources had been awarded a grant of £0.098 million to cover costs of the detailed
design of a ‘state of the art’ modern building for the development of Gaelic language.  This was
an allocation from the 2025/2026 Scottish Government Gaelic Unit, “The An Bothan Project”. 
The award required no Council match funding and had been submitted on the basis that 100%
funding was sought from the Scottish Government.  The funding would be for design only and
any build would be subject to Committee approval and a future funding bid.  The funding would
be received in the 2025/2026 financial year, however, given the timing of the award, the budget
would be added to the 2026/2027 programme with any spend achieved in 2025/2026 managed
from the funding available.
2
3

Page 4

The Walk Wheel Cycle Trust, formerly SUSTRANS, had confirmed that South Lanarkshire
would receive an additional £0.099 million for resurfacing along the existing NCN 74 Abington to
Crawford Quietway.  Works were underway to progress the project and maximise spend this
financial year but, given the timing of the award, the budget would be added to the 2026/2027
programme with any spend achieved in 2025/2026 managed from the funding available. 
The programme spend and funding for the General Fund was summarised in Appendix C to the
report and also showed a forecast for the financial year of £67.712 million. 
As noted previously, the forecast for this financial year reflected anticipated spend on 2 projects,
East Kilbride Town Centre (£0.800 million), where demolition costs were lower than anticipated,
and Hamilton Junctions (£0.950 million), as works planned for Wellhall Road had been
reprogrammed to begin in spring 2026. 
Actual spend to 23 January 2026 was £38.056 million and actual funding received at 23 January
2026 was £46.967 million. 
The physical progress achieved with the General Fund Capital Programme 2025/2026 at 23
January 2026 was detailed in appendices D to F of the report. 
The Forum decided: that the physical and financial progress of the 2025/2026
General Fund Capital Programme be noted. 
[Reference: Minutes of 12 February 2026 (Paragraph 3a) and Minutes of the Executive
Committee of 4 March 2026 (Paragraph 4)] 
3b Capital Budget Monitoring 2025/2026 – Housing Capital Programme 
A report dated 23 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the Housing Capital Programme 2025/2026 at 23 January
2026. 
The revised Housing Capital Programme for 2025/2026 totalled £87.740 million.  Programmed
funding for the year also totalled £87.740 million.  The budget, along with a detailed breakdown
of the funding sources, was included in Appendix A to the report. 
As noted previously, the profile spend on the New Build programme had been affected by
delays in the Scottish Government approval timescales, where some projects had now
commenced later in the year.  There had been good progress with further site starts at
Eaglesham View and Cairnswell Avenue, as well as accelerated starts for New Road and
Almada Street.  The previously planned acceleration of the Housing Investment Programme
(HIP) spend on External Fabrics and Energy Efficiency projects from 2026/2027 had not
materialised as planned. 
Offsetting this, was an increase in the target number of buy-backs to be achieved between now
and 31 March 2026. 
Any funding not used in 2025/2026 in relation to the new build programme, would be carried
forward into 2026/2027 to allow completion of the projects. 
In addition, £1.7 million of funding had now been confirmed to allow the Council to carry out
Single Building Assessments for 28 medium and high-rise buildings across the Council.  Due to
the timing of the award, expenditure would be incurred in 2026/2027, with funding carried
forward into next year’s HRA Capital programme.
4

Page 5

The predicted spend position for the Housing and Technical Resources’ Capital Programme for
2025/2026 was £85.940 million, an underspend of £1.8 million.  Spend to 23 January 2026
totalled £56.180 million and actual funding received was £56.180 million. 
The physical progress achieved with the Housing Capital Programme 2025/2026 at 23 January
2026 was detailed in Appendix B to the report. 
The Forum decided: that the physical and financial progress of the Housing
Capital Programme be noted. 
[Reference: Minutes of 12 February 2026 (Paragraph 3b) and Minutes of the Executive
Committee of 4 March 2026 (Paragraph 4)] 
4 Revenue Budget Monitoring 2025/2026 
A report dated 23 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted on the position of the Council’s General Fund Revenue Account and Housing
Revenue Account for the period 1 April 2025 to 23 January 2026 and a projection for the year to
31 March 2026. 
The report and associated appendices:- 
 summarised the 2025/2026 Probable Outturn position for the Council’s General Fund
Revenue Account to 31 March 2026, following agreed transfers to reserves, which showed
a breakeven position
 detailed new redetermination monies, following receipt of the Local Government Finance
Settlement 2025/2026 on 30 January 2026
 provided details of the position on the General Fund Account and the Housing Revenue
Account respectively for the period 1 April 2025 to 23 January 2026
 advised of the re-allocation of £0.100 million of Local Action Fund monies for Ward 19
(Hamilton South) to Eddlewood Football Club
 provided the Housing Revenue Account position 
As previously noted, the probable outturn position for the General Fund represented an
underspend of £3.579 million.  This underspend was after the previously identified/approved
transfer to reserves totalling £38.108 million and the proposed transfers to reserves totalling
£16.339 million. 
The budget included an allocation of £0.001 million of Local Action Fund monies.  The Executive
Committee had previously agreed that this be allocated to Low Waters Lot Community Action
Group but as the Group were currently unable to utilise the funds, the local Ward Members
(Ward 19) had agreed that the funds be re-allocated to Eddlewood Football Club. 
At 23 January 2026, the projected outturn position on the Housing Revenue Account was a
breakeven position, as detailed in Appendix 3 to the report.  This position included transfers
from reserves of £0.287 million which had been greater than budgeted. 
The Forum decided: 
(1) that the Council’s breakeven Probable Outturn position, after transfers to reserves, as
detailed in section 4 of the report, be noted; 
(2) that the current forecast on the General Fund Revenue Account for 2025/2026, as detailed
in Section 5.1, and actual spend as at 23 January 2026, as detailed in section 5.4 and
appendices 1 and 2 of the report, be noted;
5

Page 6

(3) that it be noted that £0.001 million of Ward 19 (Hamilton South) Local Action Fund monies
had been reallocated to Eddlewood Football Club, as detailed in Section 5.5 of the report;
and 
(4) that the projected breakeven position on the Housing Revenue Account for 2025/2026,
and the actual spend as at 23 January 2026, as detailed in section 6 and Appendix 3 of the
report, be noted. 
[Reference: Minutes of 12 February 2026 (Paragraph 4) and Minutes of the Executive
Committee of 4 March 2026 (Paragraph 3)] 
5 Revenue Budget 2025/2026 – Detailed Resource Analysis 
A report dated 23 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted comparing actual expenditure against budgeted expenditure for the period 1 April
2025 to 23 January 2026. 
Appendices A to F to the report provided the following information for each Resource and the
Housing Revenue Account:- 
 an Executive Summary showing the top level position for each of the Services within the
Resource and the Housing Revenue Account as at 23 January 2026
 details of the most significant variances within Resources and the Housing Revenue
Account across subjective headings and across Services as at 23 January 2026
 a line by line trend analysis of the total Resources’ expenditure and income across
subjective headings as at 23 January 2026 
The Forum decided: that the position as at 23 January 2026 be noted. 
[Reference: Minutes of 12 February 2026 (Paragraph 5)] 
6 Urgent Business 
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 30 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2025/2026 - General Fund
Capital Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s General Fund Capital Programme for the period covering 1 April 2025
to 20 February 2026.
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the 2025/2026 General Fund
Capital Programme be noted; and 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 20 February 2026
from both a financial and physical perspective. 
3.2. Appendices A to C show the financial position of the General Fund Capital
Programme, with the physical progress detailed in Appendices D to F – as they are
split into Build, Non-Build and Roads. 
4. General Fund Capital Programme 2025/2026
4.1. 2025/26 Budget:  The revised Capital Programme for 2025/2026 totals £67.712 million
as shown in Appendix A. This revised programme consists of the base budget plus
carry forward projects and adjustments which have been agreed by the Executive
Committee up to and including its meeting on 3 December 2025.  There were no
adjustments to the programme presented to the Executive Committee on 4 February
2026 and 4 March 2026. 
4.2. The funding available to support the programme also totals £67.712 million and is
detailed in Appendix C. 
4.3. 2025/2026 Forecast:  The programme spend and funding for the General Fund is
summarised in Appendix C.  As noted in 4.1, the total capital spending programme
for the year is £67.712 million. 
4.4. Appendix C shows a forecast for the financial year of £65.962 million, an anticipated
net underspend of £1.750 million. 
3
7

Page 8

4.5. As reported previously, the anticipated underspend in 2025/2026 is due to 2 projects,
being East Kilbride Town Centre (£0.800 million) where the demolition costs are lower
than anticipated, and Hamilton Junctions (£0.950 million) as works planned for
Wellhall Road have been reprogrammed to begin in spring 2026. 
4.6. Work continues to maximise spend for the remainder of the financial year, and any
variance to the spend projected above will be highlighted in the year-end report to
Committee. 
4.7. 2025/2026 Actual Position:  Actual spend incurred to the 20 February 2026 totals
£42.034 million. 
4.8. Actual funding received to 20 February 2026 is £43.620 million.  Relevant officers will
continue to closely monitor the generation of all income including receipts. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
6. Financial Implications
6.1. The financial implications are included in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 March 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council, 26 February 2025
 Executive Committee, 4 February 2026
 Executive Committee, 4 March 2026 
List of Background Papers
 Capital Ledger prints to 20 February 2026
8

Page 9

Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
9

Page 10

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRUARY 2026 
£m  
Total Base Budget (including carry forward from 2024/2025)  67.712 
Proposed Adjustments – Period 12 0.000  
Total Revised Budget  67.712   
2025/26 
Budget 
Period 12
Proposed
Adjustments
Revised 
2025/26 
Budget 
Resource  £m £m £m
Community & Enterprise 55.160 - 55.160
Education 5.006 - 5.006
Finance & Corporate 0.645 - 0.645
Housing & Technical 6.564 - 6.564
Social Work 0.337 - 0.337
TOTAL CAPITAL PROGRAMME 67.712 - 67.712 
10

Page 11

APPENDIX B 
SOUTH LANARKSHIRE COUNCIL        
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRUARY 2026 
Resource Name 
Annual
Budget
£000 
2024/25
C/F
£000
Profiling
/Adjs
£000
Total
Original
Budget
£000 
Proposed
Adjs
£000 
Proposed
Slippage
£000 
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000 
Actual
£000
Community & Enterprise 
Facs, Waste &
Grounds
1,893 978 253 3,124 478 (941) 2,661 2,271 390 714 
Enterprise &  
Sustainable Dev
32,674 7,271 (15,883) 24,062 8,630 (3,404) 29,288 24,690 4,598 18,357
Roads, Transport
& Fleet
14,655 2,820 3,014 20,489 2,722 0 23,211 22,925 286 14,481
Resource 
Total
49,222 11,069 (12,616) 47,675 11,830 (4,345) 55,160 49,886  5,274 33,552           
Education
Growth /
Accommodation
Pressures
1,603 709 1,370 3,682 566 (1,063) 3,185 3,185 0 2,125
ICT
Developments
1,300 46 0 1,346 0 0 1,346 1,346 0 1,084
Free School
Meals
0 473 3 476 0 0 476 476 0 390
Resource 
Total
2,903 1,228 1,373 5,504 566 (1,063) 5,007 5,007 0 3,599           
Finance & Corporate
IT Services 300 245 0 545 150 (50) 645 645 0 512
Resource 
Total  300  245  0  545  150  (50)  645  645  0  512           
Housing & Technical
Office Accom 6,000 1,930 180 8,110 (4,258) 0 3,852 3,204 648 2,321
Private Housing
Scheme of
Assistance
1,000 0 0 1,000 (1,000) 0 0 0 0 0
Other Housing 645 677 (304) 1,018 1,694 0 2,712 2,512 200 1,713
Resource 
Total
7,645 2,607 (124) 10,128 (3,564) 0 6,564 5,716 848 4,034  
Social Work
SWIS Plus 146 31 160 337 0 0 337 337 0 337
Resource Total  146    31  160  337  0  0  337  337  0  337           
Overall Total 60,216 15,180 (11,207) 64,189 8,982 (5,459) 67,712 61,590  6,122 42,034 
11

Page 12

APPENDIX C 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRUARY 2026 
2025/26
Original
Estimate
inc C/F 
2025/26
Revised
Budget 
2025/26
Forecast
Spend 
2025/26
Forecast
Variance 
2025/26
Actual to
20/02/26      
Expenditure £m £m £m £m £m      
General Fund Programme 64.188 67.712 65.962 1.750 42.034       
Income
2025/26
Budget
2025/26
Revised
Budget  
2025/26
Actual
To
20/01/26         
£m         £m   £m
Prudential Borrowing 17.192 17.425   0.000
Developers Contributions 1.965 4.679   4.319
Partners  0.450 3.682   1.172
Scottish Government:     
- Capital Grant 27.467 28.352   28.352 
- Vacant and Derelict Land 
- Place Based Investment
1.477
0.589
1.502
0.589  
1.390
1.552
Levelling Up Fund 7.700 7.200   6.135
Capital Receipts 0.700 0.700   0.700
Specific Reserves 0.038 1.284   0.000
Revenue Contribution 6.610     2.299   0.000      
TOTAL FUNDING 64.188 67.712   43.620 
12

Page 13

Appendix D
(Page 1)
GENERAL FUND CAPITAL PROGRAMME 2025/2026 
BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 20 FEBRUARY 2026 (PERIOD 12)
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Programme Status               
Projects Complete  - 5 8 11 24 35 40 48 56 73 78 100 - -
Projects on Programme  - 124 172 170 166 159 156 149 145 130 125 107 - -
Projects Behind
Programme 
- 1 0 1 3 1 1 0 0 0 0 0 - -
Projects Altered Brief/
Programme 
- 1 3 3 2 5 4 3 4 2 3 1 - -
Projects Held  - 12 10 10 7 8 8 9 8 8 7 7 - - 
- 143 193 195 202 208 209 209 213 213 213 215 0 0               
Project Status               
Design Feasibility  - 79 126 126 112 113 111 73 70 60 56 51 - -
Sketch Design  - 3 2 1 1 1 1 1 1 1 1 1 - -
Detailed Design  - 1 1 2 2 3 2 1 1 1 1 1 - -
Production Information  - 4 5 5 8 8 8 10 10 9 7 6 - -
Tendering  - 36 36 37 35 32 31 25 26 26 24 21 - -
On Site  - 15 15 13 20 16 16 51 49 43 46 35 - -
Complete  - 5 8 11 24 35 40 48 56 73 78 100 - - 
- 143 193 195 202 208 209 209 213 213 213 215 0 0 
13

Page 14

Appendix D
(Page 2)
General Services Capital Programme 2025/2026 
Build Variance Explanations 
Project Name Status Variance Explanation
- - - 
14

Page 15

Appendix E
(Page 1) 
GENERAL FUND CAPITAL PROGRAMME 2025/2026                     
NON-BUILD EXECUTIVE SUMMARY 
PERIOD ENDED 20 FEBRUARY 2026 (PERIOD 12) 
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Number of Projects           
Carried Forward 24/25
Programme - - - 28 31 31 31 31 31 31 31 31                 
Approved from 25/26
Programme - - - 12 15 16 16 17 17 17 17 17                 
Total Projects Currently
Reported - - - 40 46 47 47 48 48 48 48 48                 
Number of Projects                           
Projects Completed - - - 3 3 5 8 11 11 11 13 13                 
Projects Ahead of
Programme - - - 0 0 0 0 0 0 0 0 0                 
Projects on Programme - - - 37 43 42 39 35 35 35 33 33                 
Projects Behind
Programme - - - 0 0 0 0 0 0 0 0 0 
Projects, Altered
Brief/Programme - - - 0 0 0 0 0 0 0 0 0                 
Projects On Hold  - - - 0 0 0 0 2 2 2 2 2                 
- - - 40 46 47 47 48 48 48 48 48   
15

Page 16

General Services Capital Programme 2025/2026                             Appendix E
Non-Build Executive Summary – Project Status                                      (Page 2)
Project Status
SLLC - Booking and Admission System On programme
Ash Die Back On programme
Langlands Boardwalk Complete
Chatelherault Allotments Complete
Alexander Hamilton Memorial Park – Woodland Management On Hold
Nature Restoration Fund On programme
Renewal of Play Parks On programme
Glenaffeoch Road Play Area On programme
Greenhall Replacement Bridge On Hold
White Bridge Replacement, Chatelherault Country Park (cost design) On programme
Coalburn Tennis Court redevelopment On programme
Headstone Remedial Works On programme
Braidwood Play Area Redevelopment On programme
Wooddean Phase 2 Complete
Clyde Walkway repairs On programme
Country parks upgrades On programme
Composting Pilot Complete
Disposable dishware reduction pilot Complete
McKirdy Park Complete
Alexander Hamilton Memorial Fountain - Stonehouse Park Complete
Calderglen Country Park - One Way System & Infrastructure Complete
Springhall Community Centre - Upgrade Complete
Three Rivers / Clydesdale Way On programme
Country Parks Masterplan - Feasibility On programme
Calderglen Country Park - Pump Track On programme
John Cummings – Outdoor Facilities On programme
Energy Efficiency Measures Feasibility TACT Hall On programme
East Kilbride Town Centre Masterplan On programme
SLC Industrial Infrastructure - Energy Efficiency  On programme
Carnwath Community and Business Enterprise HUB On programme
Shawfield Remediation and Development On programme
Coalyard Housing On programme
Outdoor Space – Lanark Complete
Hamilton Town Centre Masterplan On programme
Hamilton Town Square On programme
Vacant & Derelict Land On programme
School uniform recycling pilot On programme
Schools ICT On programme
Education Digital Futures On programme
IT Infrastructure Refresh On programme
Electronic Document Records Management System - Phase 2 On programme
Audio Visual Upgrade - Council Chambers Complete
Public Switch Telephone Network / Alarms (Analogue to Digital) On programme
Lock Up Areas  Complete
Gypsy Travellers Sites Complete
Central Energy Efficiency Fund  On programme
Replacement SWISS Plus IT System On programme
SLC Website Upgrade On programme
16

Page 17

Appendix F
(Page 1) 
GENERAL SERVICES CAPITAL PROGRAMME 2025/2026 
ROADS EXECUTIVE SUMMARY 
PERIOD ENDED 20 FEBRUARY 2026 (PERIOD 12)                             
1 2 3 4 5 6 7 8 9 10 11 12 13              
Number of Projects             
Total Projects Currently Reported - - - 158 165 184  186 186 186 218 225 233 
Programme Status             
Projects Complete - - - 36 69 80 87 87 87 113 130 153 
Projects on Programme - - - 122 87 95   90 90 90 95 83 58 
Projects Behind Programme - - - 0 0 0     0 0 0 0 0 4 
Projects, Altered Brief / Programme - - - 0 0 0 0 0 0 1 3 4 
Projects Still to Commence - - - 0 9 9 9 9 9 9 9 14 
- - - 158 165 184 186 186 186 218 225 233 
Project Status             
Briefing - - - 19 19 16 15 15 15 16 13 15 
Production Information - - - 86 59 69 67 67 67 67 60 40 
Billing - - - 0 0 0 0 0 0 0 0 0 
Tendering - - - 0 1 2 2 2 2 1 0 4 
On Site - - - 17 17 17 15 15 15 21 22 21 
Complete - - - 36 69 80 87 87 87 113 130 153 
- - - 158 165 184  186 186 186 218 225 233 
17

Page 18

Appendix F
(Page 2) 
General Services Capital Programme 2025/2026 
Roads Variance Explanations 
Project Name Status Variance Explanation
Scottish Government Tier 1 Funding
Pedestrian and cycle improvements 
Strathaven Road / Calderglen 
Stonelaw Road - Continuous footways 
Investment Fund ~ Safer Routes
Stonelaw Road - Continuous footways (Partly funded with
Tier 1 funding as above) 
Walk Wheel Cycle Trust
NCN75 Clyde Walkway Phase 1 
Behind
Programme 
Behind
Programme 
Behind
Programme 
Behind
Programme 
Due to the tender period taking longer
than anticipated, there has been a delay
in progressing the works and the project
will continue through the financial year. 
Due to the tender period taking longer
than anticipated, there has been a delay
in progressing the works and the project
will continue through the financial year. 
Due to the tender period taking longer
than anticipated, there has been a delay
in progressing the works and the project
will continue through the financial year. 
The tender received no contractor bids
and a retender exercise was required
which has caused a delay to physical
works being undertaken. 
18

Page 19

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
ROADS / FOOTWAYS INVESTMENT PROGRAMME
East Kilbride, Rutherglen and Cambuslang Areas
Strategic Schemes 
Craigend Road, Auldhouse 1 1
Peel Road, Thorntonhall 1 1
Stroud Road, East Kilbride - Safety Barrier 1 1
Glen Moriston, East Kilbride 1 1
Spey Terrace/Grove, East Kilbride                        1 1
A727 Busby Road, East Kilbride 1 1
East Mains Road, East Kilbride 1 1
A749 Glasgow Road , East Kilbride (Kingsgate) 1 1
Mallard Terrace, East Kilbride 1 1
A726 Glasgow Road, Chapelton 1 1
Falkland Park, East Kilbride 1 1
Glen Doll, East Kilbride 1 1
Crutherland Highway, East Kilbride 1 1
Dale Avenue, East Kilbride 1 1
Redwood Drive, East Kilbride 1 1
Tantallon Park, East Kilbride 1 1
Eider Place, East Kilbride 1 1
Calderwood Road, Rutherglen 1 1
Cathkin By Pass, Rutherglen 1 1
Hallside Boulevard, Cambuslang 1 1
A724 Cambuslang Road, Rutherglen 1 1
Surface Dressing & Preventative patching Schemes
Millwell Road, Auldhouse 1 1
Markethill Road, East Kilbride 1 1
Muirburn Road, Glassford 1 1
Breckonridge Highway, Strathaven 1 1
Hallside Road/Manse Brae, Cambuslang 1 1
Newton Brae, Cambuslang 1 1
Calder Road/Westburn Road, Cambuslang 1 1
Manse Brae, Cambuslang 1 1
Westburn Road, Cambuslang - Surface Dressing 2025/2026 1 1
Breckonridge Highway, Strathaven - Surface Dressing 2025/2026 1 1
Newton Brae, Cambuslang - Surface Dressing 2025/2026 1 1
Millwell Road, East Kilbride - Surface Dressing 2025/2026 1 1
Markethill Road, East Kilbride - Surface Dressing 2025/2026 1 1
PROJECT STATUS PROGRAMME STATUS
Project Title
19

Page 20

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching and Minor asset improvements
Cairns Road 1 1
Bogleshole Road 1 1
Stonelaw Road 1 1
Westburn Road 1 1
Eaglesham Road, East Kilbride, Peel Road 1 1
Eaglesham Road, East Kilbride, Hairmyres Train Station roundabout 1 1
Quarry Road, East Kilbride 1 1
Laburnum Avenue at Chestnut Crescent, East Kilbride 1 1
Lomond, East Kilbride 1 1
Musgrove Place, East Kilbride 1 1
Philipshill Road, East Kilbride 1 1
Stroud Road, EK - Phase 1 1 1
Alwyn Drive 1 1
Stewartfield Way 1 1
Kirktonholme Road 1 1
Montgomery Street, EK 1 1
Buchandyke Road 1 1
Gilmourton 1 1
The Mid Road 1 1
Lime Road 1 1
Green Street 1 1
Newton Highway 1 1
Minor Asset Improvements 1 1
Footways
Hill View, East Kilbride 1 1
Telford Rd (Denholm to Sinclair) 1 1
Maxwellton Rd (Aikman to Blacklands) 1 1
Kirkton Park, East Kilbride 1 1
Green Street, Strathaven 1 1
Ballochmyle and Lochlea, EK 1 1
Mossneuk Ave (Greenhills to Forth), East Kilbride 1 1
Seymour Green, East Kilbride 1 1
Nithsdale, East Kilbride 1 1
Burnside Road, Rutherglen 1 1
Glasgow Rd, Cambuslang 1 1
Mentieth Drive, Rutherglen 1 1
20

Page 21

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Hamilton Area
Strategic Schemes 
Strathaven Road, Hamilton *b/f from 2024 1 1
Queens Drive, Hamilton 1 1
Main Street, Uddingston 1 1
Hunter Road / Margaret Road, Hamilton 1 1
Keir Hardie Road, Larkhall 1 1
Shaws Road, Larkhall 1 1
Avon Street, Hamilton 1 1
A724 Glasgow Road, Blantyre 1 1
Livingstone Gardens / Hope Crescent, Larkhall 1 1
Field Road, Larkhall 1 1
Abercorn Drive, Hamilton 1 1
Muir Street/Nursery Place, Blantyre 1 1
Maitland Bank, Larkhall 1 1
Graham Street, Hamilton 1 1
Muir Street, Hamilton 1 1
Alamada Street, Hamilton 1 1
Swisscott Avenue roundabout 1 1
High Blantyre Road, Blantyre 1 1
Broomfield Road, Netherburn 1 1
Annsfield Road 1 1
Hill Street, Hamilton 1 1
Plotcock Road, Quarter - Phase 1 1 1
Strategic Infrastructure  (Drainage Schemes)
Meikle Earnock Road 1 1
A72 Lanark Road 1 1
Millheugh Road, Larkhall, Broomelton Road to Glenavon Mews 1 1
Millheugh Road, Larkhall, Glenavon Mews 1 1
Preventative Maintenance Schemes
Sandford Road (Phase 2)  (*Preparatory patched in 2024) 1 1
Newhousemill Road, Hamilton (Section1) 1 1
Candermill & Marlage Road 1 1
Newhousemill Road, Hamilton (Section2) 1 1
Spittal Road 1 1
Preparatory Patching 1 1
21

Page 22

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching and Minor Asset Improvements
Swisscott Avenue, Hamilton  1 1
Blantyre farm Road, Uddingston (*b/f from 2024 -Lining & AntiSkid 1 1
Calder Street, Blantyre 1 1
Violet Crescent, Stonehouse 1 1
Canderside Toll, Larkhall 1 1
Carlisle Road, Birkenshaw, Larkhall 1 1
Union Street, Hamilton 1 1
John Street, Blantyre 1 1
Burnblea Gardens, Hamilton 1 1
Duke Street, Hamilotn 1 1
Carriageway patching and various minor works 1 1
Footways
Marswood Green / Rosslyn Court, Hamilton 1 1
Alder Avenue, Hamilton 1 1
Lochalsh Place, Blantyre 1 1
Machan Road, Larkhall 1 1
Melrose Street, Hamilton 1 1
Strathaven Road, Stonehouse 1 1
Carlisle Road, Birkenshaw, Larkhall 1 1
Hill Street, Hamilton 1 1
Castle Avenue, Bothwell (Phase 1) 1 1
Castle Avenue, Bothwell (Phase 2) 1 1
Haddow Street, Hamilton 1 1
Woodside Walk, Hamilton 1 1
Lowther Crescent, Stonehouse  1 1
Limekilnburn Road, Quarter 1 1
22

Page 23

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Clydesdale Area
Strategic Schemes 
A73 St John's Kirk 1 1
A706 Lanark (Patching) 1 1
A702 Elvanfoot 1 1
A721 Carnwath Road, Carluke 1 1
B7011 Brownlee Road 1 1
B7078 Cairn Lodge Services 1 1
New Trows Road, Lesmahagow 1 1
Stobilee Road, Lanark 1 1
Mousebank Road, Lanark 1 1
A73 Hyndford Road 1 1
B7011 Brownlee Road, Law 1 1
Anstruther Street, Law 1 1
New Kayes Road, Auchenheath 1 1
B7078 Carlisle Road, Blackwood 1 1
C1 Maudslie Road, Carluke 1 1
Coalburn Road/Bellfireld Road, Coalburn 1 1
A70 at Pretsmill 1 1
Jerviswood, Lanark 1 1
Hillview, Symington 1 1
Nemphlar Moor 1 1
Laverockhall, Lanark 1 1
Strategic Infrastructure  - Drainage Schemes
Spittal Road, Carnwath 1 1
A73 Roberton @Littlegill 1 1
B7018 Dillarburn 1 1
Vere Road, Kirkmuirhill 1 1
Tower Road, Douglas 1 1
Preventative Maintenance Schemes
A70 Lang whang 1 1
A72 Symington 1 1
B740 Crawfordjohn 1 1
B7078 Parkhead to Millrig 1 1
C29 Carstairs Junction 1 1
Strathaven Road, Lesmahagow 1 1
B7015 Climpy Road, Forth 1 1
Roberton Back Road, Dunsyre 1 1
B7055 Sornfallow 1 1
Auchnatroch, Dillarburn 1 1
Preparatory Patching 1 1
23

Page 24

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Strategic Patching and Minor Asset Improvements
Hagholm Road, Cleghorn 1 1
Mousemill Road, Lanark 1 1
Yieldshields Road, Carluke 1 1
C29 Pettinain 1 1
C14 Andershaw Road 1 1
Nursery Avenue, Douglas 1 1
Kirkstyle Car Park, Biggar 1 1
Foulford Road, Lesmahagow (Drainage) 1 1
Foulford Road, Lesmahagow (Surfacing) 1 1
B7078 Woodpark 1 1
B7086 Boghead 1 1
Daer Water Road, Elvanfoot 1 1
B7086 Burnfoot, Auchenheath 1 1
Hawksland, Lesmahagow 1 1
Blair Road, Crossford 1 1
Dillarburn Road, Lesmahagow 1 1
C37 Harelaw A706 to A70 Tarbrax 1 1
Carriageway patching and various minor works 1 1
Footways
Southfield Road, Blackwood 1 1
B7078 Carlisle Road 1 1
School Road/Strathaven Road, Lesmahagow 1 1
Main street, Forth 1 1
Hyndshaw View/Castlehill Crescent, Law 1 1
Carlisle Road, Crawford 1 1
CLIMATE EMERGENCY FUNDING
Warm Mix / Low Carbon Asphalt Trial
Wilton Road, Carluke 1 1
Murrayhill, East Kilbride 1 1
Victoria Street, Blantyre 1 1
Traffic Signal Upgrades
Ayr Road Crossroads, Ashgill  - Junction Design, MOVA upgrade 1 1
24

Page 25

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
ROADS REFURBISHMENT BUDGET
Structures projects
Bothwell Bridge, Hamilton ~ Scour Protection Works 1 1
Millheugh Bridge, Larkhall ~ Refurbishment works 1 1
Elvanfoot Bridge ~ Refurbishment works 1 1
Cander Bridge ~ Joint refurbishment 1 1
Cornwall Street footbridge 1 1
East Kilbride Structures (Cont/ from 2024/25) 1 1
Duke St MSCP 1 1
Burnside Bridge, Rutherglen (Porject led by Network Rail) 1 1
Traffic and Transportaion
Various minor works, lining & signing works 1 1
Vehicle Actived Signs ~ Upgrades 1 1
Vehicle and Pedestrian counters ~ Upgrades 1 1
Lighting ~ LED & Columns
Renewal of street lighting infrastructure 1 1
BRIDGES
Clyde Bridge ~ Remedial works and retention release payment only 1 1
SCOTTISH GOVERNMENT TIER 1 FUNDING (FORMERLY CWSR)
Pedestrian and cycle improvements
Hairmyres P&R ~ Active Travel Works 1 1
Redwood Drive ~ junction upgrade 1 1
Strathaven Road / Calderglen ~ Active Travel 1 1
Columbie Junction ~ Active travel 1 1
Stonelaw Road ~ Continuous footways 1 1
Toucan Crossing Installations
Stewartfield Way ~ Toucan crossings 1 1
LOCAL AUTHORITY DIRECT AWARD
Walking Routes to Schools and Town Centres 1 1
NCN74 from Chatelherault to Hamilton ~ Vegetation/scrub clearance 1 1
CITY DEAL PROJECTS
Cathkin ~ Complementary works (various minor works) 1 1
Stewartfield Way 1 1
Greenhills ~ Loss of value payments / Monitoring 1 1
STRATHCLYDE PARTNERSHIP FOR TRANSPORT
Hairmyres P&R 1 1
25

Page 26

SOUTH LANARKSHIRE COUNCIL
RESOURCE: ENTERPRISE, ROADS & TRANSPORTATION SERVICES 2025/26
PROJECT / PROGRAMME STATUS ~ PERIOD 12
Briefing
/ Program
m
e
Production
Inform
ation
Billing
Tendering
On
Site
Com
plete
Projects Com
plete
Projects on
Program
m
e
Projects Behind
Program
m
e
Projects altered
Brief /
Program
m
e
Projects Held
PROJECT STATUS PROGRAMME STATUS
Project Title
Lanark Interchange 1 1
Congestion Reduction Measures
High Blantyre Road / Hunthill Road / Douglas Street Blantyre ~ bus priority 1 1
COMMUNITY BUS FUND
Land Purchase at Lanark Interchange (remainder funding to Interchange) 1 1
INVESTMENT FUND
Safe Routes ~  Stonelaw Road ~ Continuous footways 1 1
BUS INFRASTRUCTURE FUND
Bus Priority Fusion Traffic Control System 1 1
Real Time Information Displays (Hamilton / Rutherglen) 1 1
Various bus stop enhancement (Hamilton / Blantyre/Clydesdale) 1 1
ROAD SAFETY IMPROVEMENT FUND
A721 Newbigging to Elsricke 1 1
B743 Strathaven to Council Boundary 1 1
A730 Mill Street at Main Street/ Burnhill Street signalised junction, Rutherglen 1 1
A724 Main Street at/near Bridge Street, Cambuslang 1 1
RoadTrace ~ connected vehicle data 1 year licence and support 1 1
CYCLING SCOTLAND
Cycle shelter installations @ 7 Primary Schools 1 1
Cycle shelter repairs 1 1
Walk Wheel Cycle Trust
NCN74 Abington to Crawford Quietway 1 1
NCN75 Clyde Walkway, Phase 1 1 1
St Stephens Avenue ~ Pedestrian Crossing 1 1
15 40 0 4 21 153 153 58 4 4 14
26

Page 27

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 30 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring 2025/2026 - Housing Capital
Programme 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 update members of the Financial Resources Scrutiny Forum of progress on the
Council’s Housing Capital Programme for the period covering 1 April 2025 to 20
February 2026. 
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation:
[recs]
(1) that the physical and financial progress of the Housing Capital Programme be
noted. 
[1recs]
3. Background
3.1. The Capital reports attached provide detail on the position as at 20 February 2026 from
both a financial and physical perspective.   
3.2. Appendix A shows the financial position of the Housing Capital Programme, with the
physical progress detailed in Appendix B. 
4. 2025/26 Housing Capital Programme 
4.1. 2025/26 Budget:  The revised Housing Capital Programme for the year is £87.740 million
as approved by the Executive Committee on 4 March 2026.   
4.2. Programmed funding for the year also totals £87.740 million.  The budget, along with a
detailed breakdown of the funding sources is included in Appendix A to this report.   
4.3. 2025/2026 Forecast:  As reported in the March meeting, the predicted spend position
for the Housing Programme for this financial year is £85.940 million, an underspend of
£1.8 million.     
4.4. 2025/2026 Actual Position:  Spend to 20 February 2026 on the Housing Capital
Programme amounts to £63.563 million.   
4.5. As at 23 January 2026, £63.563 million of funding had been received. 
5. Employee Implications
5.1. There are no employee implications as a result of this report. 
4
27

Page 28

6. Financial Implications 
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 March 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 4 March 2026 
List of Background Papers 
 Capital Ledger prints to 20 February 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
28

Page 29

APPENDIX A 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2025/26
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRAURY 2026 
2025/26
Annual
Budget 
2025/26
Forecast
Spend
2025/26
Forecast
Variance
2025/26
Actual to
20/02/26 
£m £m £m £m
Expenditure 
2025/26 Budget  87.740  85.940  1.800  63.563     
2025/26
Annual
Budget  
2025/26
Actual to
20/02/26 
£m   £m
Income         
Income 
Capital Receipts  -    0.032
Capital Funded from Current Revenue 35.633   26.672
Prudential Borrowing 19.409   21.429
Scottish Government Specific Grant:    
- Capital Grant 1.652   0.000
- New Build 24.726   12.513
- Open Market Purchase Scheme 6.000   2.651
- Mortgage to Rent 0.120   0.060
Climate Emergency Fund 0.200   0.000
Other Income 0.000   0.206 
87.740   63.563 
29

Page 30

Appendix B
(Page 1)
HOUSING CAPITAL PROGRAMME 2025/2026
EXECUTIVE SUMMARY
PERIOD ENDED 20 FEBRUARY 2026
Expenditure Periods 
1 2 3 4 5 6 7 8 9 10 11 12 13 14               
Programme Status               
Projects Complete  - 9 13 15 19 24 29 30 36 40 43 45 - -               
Projects on Programme - 100 104 106 110 98 92 98 92 86 90   84 - -               
Projects Behind
Programme 
- 5 2 0 0 1 1 1 3 2 1 2 - -               
Projects Altered
Brief/Programme
- 1 3 6 0 5 6 1 1 4 1 4 - -               
Projects Held  - 16 17 17 16 20 20 18 12 12 13 13 - - 
- 131 139 144 145 148 148 148 144 144 148 148 0 0               
Project Status              
Design Feasibility  - 34 40 43 40 37 36 33 25 25 27 26 - -               
Sketch Design  - 6 5 2 1 1 1 1 1 1 1 1 - -               
Detailed Design  - 2 2 1 2 2 2 2 1 1 1 0 - -               
Production Information - 18 17 21 21 20 19 19 16 12 12     12  - -               
Tendering - 20 23 23 23 27 27 23 25 23 22 21 - -               
On Site  - 42 39 39 39 37 34 40 40 42 42 43 - -               
Complete - 9 13 15 19 24 29 30 36 40 43 45 - -               
- 131 139 144 145 148 148 148 144 144 148 148 0 0 
30

Page 31

Appendix B
(Page 2) 
Housing Capital Programme 2025/2026 
Build Variance Explanations 
Project Name Status Variance Explanation
Stonefield Bin Stores Phase 3 - Demolish
Outhouses and Replace With Bin Cages
Behind Programme The programme of works is behind
due to awaiting Contractor Health
and Safety vetting to conclude. 
Etterick Wynd, Blantyre - Retaining Wall Repairs  Behind Programme The programme of works is behind
as structural integrity issues have
caused issues with design and
subsequent construction. 
31

Page 32

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Original Budget 25/26 0 2.462 7.801 14.379 19.032 27.525 33.147 39.407 45.148 52.315 56.18 63.563 69.702 85.948
Revised Budget 25/26 0 2.462 7.801 14.379 19.032 27.525 33.147 39.407 45.148 52.315 56.18 63.563 69.83 87.74
Actual 25/26 0 2.462 7.801 14.379 19.032 27.525 33.147 39.407 45.148 52.315 56.18 63.563 0 0
0
10
20
30
40
50
60
70
80
90
100
£ Millions
HRA Capital Expenditure Profile Graph 25/26
32

Page 33

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 30 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 12 - 1 April 2025
to 20 February 2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the members of the Financial Resources Scrutiny Forum of the forecast
for the year to 31 March 2026 for the Council’s General Fund Revenue Account
and Housing Revenue Account, and the actual spend position for the period 1
April 2025 to 20 February 2026
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s breakeven probable outturn position after Transfers to
Reserves (section 4), be noted;
(2) that the current forecast on the General Fund Revenue Account for 2025/2026
(section 5.1), and the actual spend as at 20 February 2026 (section 5.4 and
Appendices 1 and 2), be noted;
(3) that the projected breakeven position on the Housing Revenue Account for
2025/2026, and the actual spend as at 20 February 2026 (section 6 and
Appendix 3 of the report), be noted. 
3. Background
3.1. This overview report will summarise the previously reported 2025/2026 Probable
Outturn position for the Council’s General Revenue Account to 31 March 2026.  An
Executive Summary is provided in section 4 outlining the detail of the General Fund
outturn position including details of proposed transfers to Reserves.  An update on
the projected outturn for 2025/2026 for both the Council’s General Fund (section 5)
and for the Housing Revenue Account (section 6) is also provided. 
4. Executive Summary – 2025/2026 General Services Probable Outturn 
4.1. As reported previously, the 2025/2026 probable outturn position for the General
Fund presented an underspend of £3.579 million.  This underspend is after the
previously identified / approved Transfers to Reserves (£38.108 million) and the
proposed Transfers to Reserves (£16.339 million) that were subsequently approved
by the Executive Committee in February 2026.  
5
33

Page 34

4.2. In terms of the £3.579 million, the following was agreed by Committee (Executive, 4
February 2026):- 
• that £1.000 million be transferred to reserves to support the Marmot initiative.  
• that £0.040 million be set aside to support the continuation of the Winter Wishes
programme.
• that £0.100 million be transferred to reserves for Commercial Feasibility costs.
• that £0.400 million be set aside to augment the external medium grants allocation
available for the next two years beyond 2026/2027.
• that £0.300 million be allocated to Heat Network / Decarbonisation projects.
• that the remaining £1.739 million underspend be transferred to reserves for
budget considerations in future years. 
5. 2025/2026 General Services Probable Outturn – Resources and Corporate Lines
5.1. Total Resource Position:  The forecast position before and after Transfers to
Reserves is shown in Appendices 1 and 2.  The position presented in Appendix 2
reflects the previously reported probable outturn underspend of £3.579 million as a
Transfer to Reserves (section 4.2).  This is in line with the probable outturn reported
to Executive Committee on 4 February 2026. 
5.2. Financial monitoring against the reported probable outturn position continues across
all Resources as we approach the financial year end.  Any movement from the
probable outturn position will be reported as part of the year end position.  This may
include further proposed transfers to reserves if any committed monies have not
been spent in year. 
5.3. Local Government Finance Order:  Following the draft Local Government
Settlement in January, the Scottish Government have now issued the Local
Government Finance Order on 26 February 2026.  This is the final notification of
funding following the budget process at Scottish Government.  As well as advising of
the 2026/2027 Local Government Settlement, the document also provided formal
confirmation of a number of Revenue grant redeterminations for financial year
2025/2026.  There were no changes to either the 2026/2027 Settlement or
2025/2026 redeterminations from the indicative figures previously provided and
reported to Committee and Council. 
5.4. Clydeplan:  The Joint Committee of the Glasgow and the Clyde Valley Strategic
Development Planning Authority, known as Clydeplan, was formally terminated on
31 March 2025.  The Council are due to receive a share of the reserves that have
been accumulated (£0.032 million).  It will be proposed at year end to utilise this
funding for IT development upgrades to planning and building standards
performance systems, once all agreements have been reached with member
authorities. 
6. Housing Revenue Account Position
6.1. Appendix 3 also shows the forecast position for the financial year.  The Appendix
shows a break-even position for the Housing Revenue Account.   
6.2. This breakeven position includes a higher than budgeted Transfer from Reserves
(£0.287 million greater than budgeted).  The detail is shown in Appendix 3 with
variance explanations across subjective categories and includes spend on the new
Housing Management system introduced this year.  
34

Page 35

7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. As detailed in sections 4 to 6 of the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
11.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
13 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 20 February 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
35

Page 36

Note:  While the Year to Date Actual at period 12 presents a net surplus position (£81.052m), this is timing only.  The forecast outturn
before transfers to reserves shows an underspend of £19.918 million.
Appendix 1
Before Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 131.066 129.600 1.466 1.12% 106.667
Facilities Waste and Grounds 79.332 78.570 0.762 0.96% 63.095
Leisure and Culture 20.090 20.062 0.028 0.14% 19.099
Planning and Regulatory Services 5.235 4.224 1.011 19.31% 3.221
Enterprise and Sustainable Development 6.658 7.262 (0.604) (9.07%) 7.411
Roads, Transportation and Fleet 19.751 19.482 0.269 1.36% 13.841
Education Resources 502.289 501.811 0.478 0.10% 451.717
Education 502.289 501.811 0.478 0.10% 451.717
Finance and Corporate Resources 44.456 43.578 0.878 1.97% 45.040
Finance Services - Strategy 2.311 2.317 (0.006) (0.26%) 3.471
Finance Services - Transactions 18.955 17.981 0.974 5.14% 15.131
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.430
Information Technology Services 8.512 8.650 (0.138) (1.62%) 11.328
Communications and Strategy Services 2.530 2.307 0.223 8.81% 2.402
Administration and Licensing Services 4.985 5.003 (0.018) (0.36%) 5.299
Personnel Services 6.800 6.975 (0.175) (2.57%) 6.979
Housing & Technical Resources 18.941 18.818 0.123 0.65% 18.747
Housing Services 8.289 8.055 0.234 2.82% 8.382
Property Services 10.652 10.763 (0.111) (1.04%) 10.365
Social Work Resources 251.967 247.622 4.345 1.72% 214.019
Performance and Support Services 6.187 5.879 0.308 4.98% 4.595
Children and Families 52.740 50.635 2.105 3.99% 43.305
Adults and Older People 192.159 190.909 1.250 0.65% 165.830
Justice and Substance Misuse 0.881 0.199 0.682 77.41% 0.289
Joint Boards 1.629 1.629 0.000 0.00% 1.504
950.348 943.058 7.290 0.77% 837.694
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 950.348 943.058 7.290 0.77% 837.694
CFCR 2.279 2.279 0.000 0.00% 0.000
Loan Charges 37.249 34.790 2.459 6.60% 0.000
Corporate Items (3.824) (13.663) 9.839 (257.30%) 0.267
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
Teacher Numbers - T/f to Reserves 4.200 4.200 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Waste and Recycling Services - T/f to Reserves 2.200 2.200 0.000 0.00% 0.000
Budget Strategy - T/f to Reserves 4.500 4.500 0.000 0.00% 0.000
Outturn Underspend - T/f to Reserves 0.000 0.000 0.000 0.00% 0.000
Total Expenditure 1,024.160 1,004.572 19.588 1.91% 837.961
Council Tax 196.599 196.929 0.330 0.17% 181.781
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (22.870)
171.823 172.153 0.330 0.19% 158.911
General Revenue Grant 452.334 452.334 0.000 0.00% 417.539
Non Domestic Rates 371.110 371.110 0.000 0.00% 342.563
Transfer from Reserves 28.893 28.893 0.000 0.00% 0.000
Total Income 1,024.160 1,024.490 0.330 0.03% 919.013
Net Expenditure 0.000 (19.918) 19.918 0.00% (81.052)
Period Ended 20 February 2026 (No.12)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
36

Page 37

Note:  While the Year to Date Actual at period 12 presents a net surplus position (£81.052m), this is timing only. The forecast outturn after
transfers to reserves shows a breakeven position.
Appendix 2
After Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 131.066 130.718 0.348 0.27% 106.667
Facilities Waste and Grounds 79.332 79.010 0.322 0.41% 63.095
Leisure and Culture 20.090 20.126 (0.036) (0.18%) 19.099
Planning and Regulatory Services 5.235 4.397 0.838 16.01% 3.221
Enterprise and Sustainable Development 6.658 7.414 (0.756) (11.35%) 7.411
Roads, Transportation and Fleet 19.751 19.771 (0.020) (0.10%) 13.841
Education Resources 502.289 502.289 0.000 0.00% 451.717
Education 502.289 502.289 0.000 0.00% 451.717
Finance and Corporate Resources 44.456 43.878 0.578 1.30% 45.040
Finance Services - Strategy 2.311 2.343 (0.032) (1.38%) 3.471
Finance Services - Transactions 18.955 18.401 0.554 2.92% 15.131
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.430
Information Technology Services 8.512 8.614 (0.102) (1.20%) 11.328
Communications and Strategy Services 2.530 2.296 0.234 9.25% 2.402
Administration and Licensing Services 4.985 4.964 0.021 0.42% 5.299
Personnel Services 6.800 6.915 (0.115) (1.69%) 6.979
Housing & Technical Resources 18.941 18.941 0.000 0.00% 18.747
Housing Services 8.289 8.229 0.060 0.72% 8.382
Property Services 10.652 10.712 (0.060) (0.56%) 10.365
Social Work Resources 251.967 251.967 0.000 0.00% 214.019
Performance and Support Services 6.187 5.899 0.288 4.65% 4.595
Children and Families 52.740 53.730 (0.990) (1.88%) 43.305
Adults and Older People 192.159 192.159 0.000 0.00% 165.830
Justice and Substance Misuse 0.881 0.179 0.702 79.68% 0.289
Joint Boards 1.629 1.629 0.000 0.00% 1.504
950.348 949.422 0.926 0.10% 837.694
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 950.348 949.422 0.926 0.10% 837.694
CFCR 2.279 2.279 0.000 0.00% 0.000
Loan Charges 37.249 35.148 2.101 5.64% 0.000
Corporate Items (3.824) (4.246) 0.422 (11.04%) 0.267
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
Teacher Numbers - T/f to Reserves 4.200 4.200 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Waste and Recycling Services - T/f to Reserves 2.200 2.200 0.000 0.00% 0.000
Budget Strategy - T/f to Reserves 4.500 4.500 0.000 0.00% 0.000
Outturn Underspend - T/f to Reserves 0.000 3.579 (3.579) 0.00% 0.000
Total Expenditure 1,024.160 1,024.290 (0.130) (0.01%) 837.961
Council Tax 196.599 196.729 0.130 0.07% 181.781
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (22.870)
171.823 171.953 0.130 0.08% 158.911
General Revenue Grant 452.334 452.334 0.000 0.00% 417.539
Non Domestic Rates 371.110 371.110 0.000 0.00% 342.563
Transfer from Reserves 28.893 28.893 0.000 0.00% 0.000
Total Income 1,024.160 1,024.290 0.130 0.01% 919.013
Net Expenditure 0.000 0.000 0.000 0.00% (81.052)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 20 February 2026 (No.12)
37

Page 38

Variance Explanations
1. Employee Costs
The underspend in employee costs is due to vacancies within the service that continue to be actively recruited. 
2. Property Costs
The forecast underspend is due to the net effect of underspends in void rent loss and ground maintenance charges partially offset by
greater than budgeted contract cleaning. 
3. Supplies & Services
The forecast overspend is mainly due to spend on IT equipment costs this financial year. 
4. Administration Costs
The forecast underspend is mainly due to lower than anticipated telephone and postage costs in the financial year. 
5. Payment to Other Bodies
Payments to Other Bodies are overspent due to spend on IT systems this financial year. 
6. Income
Income is under recovered mainly due to lower than budgeted income from laundry. 
Appendix 3
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 15.360 15.282 0.078 0.51% 1 13.324
Property Costs 62.592 62.123 0.469 0.75% 2 43.937
Supplies and Services 0.479 0.537 (0.058) (12.11%) 3 0.142
Transport and Plant 0.195 0.234 (0.039) (20.00%) 0.146
Administration 5.604 5.571 0.033 0.59% 4 0.411
Payment to Other Bodies 3.271 3.669 (0.398) (12.17%) 5 2.374
Payment to Contractors 0.100 0.100 0.000 0.00% 0.080
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 35.700 35.731 (0.031) 0.00% 31.247
Total Controllable Exp. 123.301 123.247 0.054 0.04% 91.661
Total Controllable Inc. (133.819) (133.806) (0.013) 0.01% 6 (110.995)
Transfer to/(from) Balance Sheet (4.076) (4.035) (0.041) 1.01% 0.000
Net Controllable Exp. (14.594) (14.594) 0.000 0.00% (19.334)
Loan Charges 14.594 14.594 0.000 0.00% 0.000
Net Controllable Exp. 0.000 0.000 0.000 0.00% (19.334)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 20 February 2026 (No.12)
Housing Revenue Account
38

Page 39

Report
Agenda Item 
Report to: Financial Resources Scrutiny Forum
Date of Meeting: 30 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget 2025/2026 - Detailed Resource
Analysis 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update members of the Financial Resources Scrutiny Forum on the Council’s
revenue budget for 2025/2026
[1purpose]
2. Recommendation(s)
2.1. The Forum is asked to approve the following recommendation(s):-
[recs]
(1) that the 2025/2026 detailed financial analysis for each of the individual
Resources and the Housing Revenue Account, be noted.
1recs]
3. Background
3.1. The individual reports attached provide detailed information on each of the Resource
Revenue Budgets for the period to 20 February 2026.  The detailed papers cover the
General Services and also the Housing Revenue Account. 
3.2. The following information is provided for each Resource and the Housing Revenue
Account:- 
 an Executive Summary showing the top-level position
 details of the most significant variances across Subjective headings and across
Services
 a line-by-line trend analysis of the total Resource expenditure and income across
Subjective headings 
3.3. These are shown in Appendices A to F attached. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. As detailed in each of the individual Resource papers. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report.
6
39

Page 40

7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed.  In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
13 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Revenue Ledger prints to 20 February 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk 
40

Page 41

Appendix A
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 20 February 2026 (No.12)
Community and Enterprise Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Facilities, Waste and Grounds 79.332 78.570 0.762 0.96% 63.095
Leisure and Culture 20.090 20.062 0.028 0.14% 19.099
Planning and Regulatory Services 5.235 4.224 1.011 19.31% 3.221
Enterprise and Sustainable Development 6.658 7.262 (0.604) (9.07%) 7.411
Roads, Transportation and Fleet 19.751 19.482 0.269 1.36% 13.841
Total Community and Enterprise Resources 131.066 129.600 1.466 1.12% 106.667
6
41

Page 42

Community and Enterprise Resources Variance Analysis 2025/26 (Period 12) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 4,991k
under
APT&C Basic/ Superannuation/
National Insurance - 6,041k under
Facilities, Waste and
Grounds Services -
4,247k under 
The variances are mainly due to
vacant posts with recruitment
currently being progressed.   
Planning and
Regulatory Services -
469k under 
Enterprise and
Sustainable
Development - 287k
under 
Roads, Transportation
and Fleet Services -
1,038k under    
Overtime - (1,021k) over Facilities, Waste and
Grounds Services -
(988k) over 
The projected overtime
overspend within Waste reflects
the distribution of new
food/garden bins in the
Clydesdale area and the
covering of vacant posts within
the service. The projected
overtime overspend within
Facilities, Grounds and Streets
is due to vacancies within the
services. It is anticipated that
costs will be offset against basic
pay (above).
42

Page 43

Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs
(cont.)  
Roads, Transportation
and Fleet Services -
(47k) over 
The projected overtime
overspend within Fleet is due to
vacancies within the services.
This is partially offset by an
underspend on overtime within
Roads. 
Pension Increases - (61k) over Facilities, Waste and
Grounds Services -
(14k) over 
The forecast overspend relates
to the ongoing cost of early
retirals. 
Planning and
Regulatory Services -
(74k) over 
Enterprise and
Sustainable
Development - (2k)
over 
Roads, Transportation
and Fleet Services -
29k under
The forecast overspend relates
to the ongoing cost of early
retirals. 
The forecast overspend relates
to the ongoing cost of early
retirals. 
The forecast underspend
relates to a reduction in the cost
of early retirals. 
43

Page 44

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs (1,350k)
over
Rates - 95k under Facilities, Waste and
Grounds Services - 77k
under 
The underspend is mainly due
to rates relief for the former CA
site Muttonhole Road. 
Repairs and Maintenance Internal -
(462k) over 
Facilities, Waste and
Grounds Services -
(29k) over 
Roads, Transportation
and Fleet Services -
(112k) over 
The overspend is mainly due to
repair work undertaken at
Forrest Street. 
The overspend is mainly due to
anticipated repairs costs for
Roads depots being higher than
budget. 
Enterprise and
Sustainable
Development - (321k)
over
The anticipated overspend is
due to costs in excess of
provision for Hamilton Towers
dilapidations. 
Repairs and Maintenance External -
(37k) over 
Facilities, Waste and
Grounds Services -
(11k) over 
Planning and
Regulatory Services -
11k under 
Enterprise and
Sustainable
Development - (22k)
over 
The overspend is mainly due to
repair work undertaken at
Forrest Street. 
The forecast is predicting less
spend on repairs and
maintenance costs within
Planning. 
The anticipated overspend is
due to costs in excess of
provision for Hamilton Towers
dilapidations. 
44

Page 45

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.)  
Roads, Transportation
and Fleet Services -
(15k) over 
The overspend is mainly due to
anticipated repairs costs for
Roads depots being higher than
budget. 
Electricity Contract - 213k under Facilities, Waste and
Grounds Services -
192k under 
Enterprise and
Sustainable
Development - 21k
under
The predicted underspend is
within Amenity Services and is
due to costs being less than
budget. 
The predicted underspend is
within Economic Development
and is due to costs being less
than budget.   
Gas - 15k under  Facilities, Waste and
Grounds Services - 16k
under 
The predicted underspend is
within Amenity Services and is
due to costs being less than
budget. 
Cleaning & Janitorial Supplies and
Equipment - (316k) over
Facilities, Waste and
Grounds Services -
(319k) over 
The projected overspend
relates to an increase in costs
for cleaning materials within
Facilities Management. 
Health & Hygiene - (94k) over Facilities, Waste and
Grounds Services -
(94k) over 
The projected overspend is
within FACS and relates to the
purchase of healthy & hygiene
materials. 
45

Page 46

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Refuse Uplift - (95k) over Facilities, Waste and
Grounds Services -
(95k) over 
The projected overspend
relates to greater than budgeted
costs for Refuse Uplifts within
Facilities Management. 
Other Property Costs - (608k) over Facilities, Waste and
Grounds Services -
(559k) over 
Enterprise and
Sustainable
Development - (65k)
over 
The overspend relates to costs
for enabling works being carried
out at Forrest Street. 
The overspend mainly relates to
costs for the upgrade of the 8th
floor Council Offices in respect
of Amenity Staff transfer.
Supplies and
Services
(2,350k)
over
Computer Equipment Purchase -
(368k) over
Facilities, Waste and
Grounds Services -
(146k) over 
Planning and
Regulatory Services -
(38k) over 
The overspend is within
Facilities and relates to
additional laptops required by
the service. 
This projected overspend
mainly relates to the greater
than budgeted costs on the IT
system upgrade for IDOX within
Planning & Building Standards. 
Roads, Transportation
and Fleet Services -
(179k) over
This projected overspend
mainly relates to increased
costs for annual subscriptions
for Computer Licenses within
Roads. 
46

Page 47

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and
Services (cont.) 
Equipment, Apparatus & Tools - 278k
under 
Facilities, Waste and
Grounds Services -
299k under. 
Roads, Transportation
and Fleet Services -
(22k) over
The projected underspend
relates to costs on purchase
and repairs on equipment for
catering and cleaning within
Facilities Management. 
The overspend is for equipment
costs associated with the
workshop. 
Materials - (2,096k) over Roads, Transportation
and Fleet Services -
(2,053k) over 
The overspend is within Roads
and relates to a greater spend
on materials due to increased
levels of work on roads
maintenance. 
Food Purchases - (223k) over Facilities, Waste and
Grounds Services -
(223k) over
The overspend within Facilities
relates to rising costs in food.  
Protective Clothing - (150k) over  Facilities, Waste and
Grounds Services -
(140k) over
The overspend is within
Facilities, Grounds and Waste
and is for PPE required within
the Services.  
Other Supplies and Services - 243k
under
Facilities, Waste and
Grounds Services -
255k under
The underspend is due to less
spend on other equipment in
catering within FACS.
47

Page 48

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant
(1,792k)
over
Purchase of Vehicles - (709k) over Facilities, Waste and
Grounds Services -
(700k) over 
The forecast overspend relates
to vehicles due to be purchased
within Grounds.  
Fleet Services - Drivers - (42k) over Roads, Transportation
and Fleet - (42k) over
The forecast overspend is due
to an increased charge from
Fleet to cover Road's PSA
service.  
Fleet Services - Fuel - (522k) over  Facilities, Waste and
Grounds Services -
(26k) over 
Roads, Transportation
and Fleet - (497k) over
The overspend is within
Grounds and relates to EV
charging costs. 
The projected overspend is due
to fuel costs being higher than
budgeted. This is offset by an
over recovery in income. 
Fleet Services Vehicle Hires - 39k
under
Facilities, Waste and
Grounds Services - 8k
under 
Roads, Transportation
and Fleet - 33k under 
The underspend is due to a
reduction in the number of
vehicles being returned during
the year. 
The underspend is due to a
reduction in the number of Fleet
vehicles being returned to the
hire company requiring repair
during the year. 
48

Page 49

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.) 
Pool Car Rental - (7k) over Facilities, Waste and
Grounds Services - 8k
under 
Planning and
Regulatory Services -
(16k) over 
The underspend is due to less
demand for Pool Cars within
Waste. 
This projected overspend is due
to a greater demand than the
budget set for the hire of Pool
Cars within Planning.  
Pool Car Fuel - 19k under Planning and
Regulatory Services -
16k under 
The projected underspend is
due to Pool Cars now being
mostly electric.  
Other Transport Costs - 29k under Roads, Transportation
and Fleet - 26k under 
The underspend is in the main
due to costs for telematics
being less than budget.  
Licences - (108k) over Roads, Transportation
and Fleet - (108k) over 
The overspend is due to costs
for licences and MOT
certificates being higher than
budget, this is offset by an over
recovery in income. 
Fleet Services Repairs - Outside
Repairs - (350k) over
Roads, Transportation
and Fleet - (350k) over
The projected overspend is
mainly due to higher than
anticipated expenditure on
outside repairs within Fleet
Services. This is partially offset
by income for rechargeable
works. 
49

Page 50

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.) 
Fleet Services Repairs - Materials -
(256k) over
Roads, Transportation
and Fleet - (256k) over
The projected overspend is due
to higher than budgeted costs
for materials and spares within
Fleet Services.  
Fleet Services Repairs - Tyres -
(165k) over
Roads, Transportation
and Fleet - (165k) over
The projected overspend is due
to higher than budgeted costs
for tyres.  
Vehicle Maintenance - (511k) over Facilities, Waste and
Grounds Services -
(295k) over 
This projected overspend is due
to higher than budgeted
charges for routine
maintenance within Grounds
and Waste. 
Roads, Transportation
and Fleet - (218k) over
This projected overspend is due
to higher than budgeted
charges for routine
maintenance within Fleet and
Roads. 
Vehicle Asset Modification - (142k)
over
Facilities, Waste and
Grounds Services -
(171k) over 
The projected overspend mainly
relates to the installation of air
conditioning into Refuse
collection vehicles, in respect of
health and safety. 
50

Page 51

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant
(cont.) 
Fleet Service Charges - Vehicle
Leasing - 218k under
Facilities, Waste and
Grounds Services -
182k under 
Roads, Transportation
and Fleet - 27k under
The underspend is within
Grounds and relates to the
number of vehicles currently on
lease being less than budget. 
This is offset by an overspend
on hire costs. 
This projected underspend
mainly relates to EV vehicles
that were previously on lease
now being on contract hire,
buses being returned by Fleet
Services and pool cars being
transferred to Social Work. 
Fleet Service Charges - Hired
Vehicles/ Contract Hires - 198k under
Facilities, Waste and
Grounds Services -
(222k) over 
Roads, Transportation
and Fleet - 425k under 
This projected overspend is due
to higher than budgeted
charges for external hires within
Grounds and Waste. 
The projected underspend is
mainly due to the lower level of
demand for hires for carrying
out road and lighting works. 
Fleet Service Charges - Road Fund
Licences - 30k under
Facilities, Waste and
Grounds Services - 14k
under 
The projected underspend is
due to a decrease in RFL costs
for vehicles being replaced by
electric vehicles which incur a
lower charge. 
51

Page 52

Subjective Head Variance  Subjective line Service / amount Explanation
Transport and
Plant (cont.)  
Roads, Transportation
and Fleet - 15k under 
The projected underspend is
mainly within Fleet and is due to
a decrease in RFL costs for
vehicles being replaced by
electric vehicles which incur a
lower charge. 
Fleet Service Charges - Fuel - 456k
under
Facilities, Waste and
Grounds Services -
247k under 
Roads, Transportation
and Fleet - 202k under 
The forecasted underspend is
in the main due to an increase
in the number of electric
vehicles within the service,
meaning less fuel is required,
this is offset by an overspend in
EV fuel costs above. 
The forecast underspend is
mainly due to less utilisation of
fleet vehicles and plant within
the Construction Unit. 
Admin Costs (183k) over Printing & Stationery - (32k) over  Facilities, Waste and
Grounds Services -
(56k) over 
Enterprise &
Sustainable
Development - 15k
under
The overspend is within
Facilities and relates to menu
development costs and food
and garden licences. 
The underspend is mainly
within Support, where there is a
reduction in requirement for
printing and stationery.
52

Page 53

Subjective Head Variance  Subjective line Service / amount Explanation
Admin Costs
(cont.) 
Telephones - 39k under  Facilities, Waste and
Grounds Services - 15k
under 
The underspend within all
services is due to less
telephones being required in
the offices.   
Planning and
Regulatory Services -
11k under 
Enterprise &
Sustainable
Development - 15k
under 
Mobile Phones - (15k) over 
Postages - (22k) over 
Facilities, Waste and
Grounds Services -
(5k) over 
Enterprise &
Sustainable
Development - (10k)
over 
Planning and
Regulatory Services -
(12k) over 
Roads, Transportation
and Fleet - (8k) over 
The overspend is due to the
requirement for mobile phones
increasing, this is offset by an
underspend in telephones
within all services. 
The forecast anticipates a
greater demand on postal
services for notification of
Planning applications. 
The forecast anticipates a
greater demand on postal
services for notification of works
to residents.
53

Page 54

Subjective Head Variance  Subjective line Service / amount Explanation
Admin Costs
(cont.) 
Membership Fees - (17k) over 
Medical Costs - (51k) over 
Legal Expenses - (26k) over 
Internet Agency Fees - (16k) over 
Training - (32k) over
Facilities, Waste and
Grounds Services -
(12k) over 
Facilities, Waste and
Grounds Services -
(42k) over 
Roads, Transportation
and Fleet - (10k) over 
Planning and
Regulatory Services -
(16k) over 
Facilities, Waste and
Grounds Services -
(16k) over 
Facilities, Waste and
Grounds Services -
(15k) over 
Roads, Transportation
and Fleet - (5k) over 
The overspend is within
Grounds and relates to
Standpipe Licence costs. 
The overspend reflects a higher
than anticipated level of medical
referrals due to staff absence
levels. 
The forecast overspend mainly
relates to Reporter costs in
respect of the Local Plan. 
The overspend within Facilities
is in relation to payments made
for the Parent Pay system. 
The overspend relates to
greater than budgeted costs for
statutory training within the
services. 
The overspend relates to
greater than budgeted costs for
statutory training within the
Roads service. 
54

Page 55

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to Other
Bodies 
(555k) over Payments to Other Bodies - (704k)
over 
Enterprise and
Sustainable
Development - (621k)
over 
The anticipated overspend is
due to higher than budgeted
costs for Christmas switch on
events and payments made
through Employability in respect
of No One Left Behind and
Tackling child Poverty.   
Leisure - 20k under 
Roads, Transportation
and Fleet - (115k) over 
The forecast underspend is due
to the annual Fireworks Display
at Strathclyde Park not being
held this year, due to ongoing
upgrades at Strathclyde Park. 
The forecast overspend is due
to charges greater than budget
from WoSLA, the weather
forecasts for Winter. 
Activities Programme - 167k under Enterprise and
Sustainable
Development - 167k
under 
The anticipated underspend is
due to lower than budgeted
costs through Employability in
respect of No One Left Behind
Training, which is offset by a
reduction of income. 
55

Page 56

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors 
(4,649k)
over
Payment to Trading Services -
(2,787k)
Enterprise and
Sustainable
Development - (40k)
over 
Roads, Transportation
and Fleet - (2,744k)
over 
The forecast overspend
includes for outstanding spend
on railings and doors in respect
of Rutherglen 900. 
The forecast overspend is
mainly due to higher than
budgeted costs for winter and
additional costs for reactive
maintenance of carriageways
and increased use of specialist
contractors within the
Construction Unit. 
Payment to Contractors - (1,861k)
over
Facilities, Waste and
Grounds Services -
(273k) over 
Planning and
Regulatory Services -
(111k) over 
The projected overspend within
Streets relates to running costs
associated with the
crematorium and cemeteries
and overspend on the disposal
of general waste within the CA
Sites.
The projected overspend
relates to the increased contract
rates for the kennelling of stray
dogs, house clearances and
pest control within
Environmental Services. 
56

Page 57

Subjective Head Variance  Subjective line Service / amount Explanation
Payment to
Contractors (cont.)
Roads, Transportation
and Fleet - (1,477k)
over 
This projected overspend is
mainly the effect of an
increased spend on bridge
repairs and statutory
inspections within Structures,
along with increased contract
costs within the Traffic Section
on traffic lights.
Financing Charges  (16k) over I.T. Equipment Leasing Contract -
(16k) over
Facilities, Waste and
Grounds Services -
(7k) over 
Enterprise and
Sustainable
Development - (£15k)
over 
Planning and
Regulatory Services -
10k under 
The forecast overspend is due
to higher than budgeted costs
for IT leasing within Facilities
and Amenity. 
The forecast overspend is due
to higher than budgeted costs
for IT leasing within Support
Services. 
The forecast underspend is due
to lower than budgeted costs for
IT leasing within Environmental
Services. 
57

Page 58

Subjective Head Variance  Subjective line Service / amount Explanation
Income 7,370 over
recovered
Contributions from Other Bodies -
(54k) under recovered
Facilities, Waste and
Grounds Services -
130k over recovered 
Enterprise &
Sustainable
Development - (188k)
under recovered 
The predicted over recovery is
in the main due to rebates
received from Brakes within
Facilities. 
The predicted under recovery is
mainly within employability
where the reduction in income
reflects the underspends within
this service overall as is income
recovered through Business
Support. 
Sales - 482k over recovered  Facilities, Waste and
Grounds Services - 93k
over recovered 
Roads, Transportation
and Fleet - 389k over
recovered 
The predicted over recovery is
due to income received from
vending machines and an over
recovery within Corporate
Catering. This is partially offset
by an under recovery in school
meal income. 
The over recovery mainly
relates to higher than
anticipated income from skip
permits, road closures and
Inspection fees within Roads
General. 
58

Page 59

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges - General - 183k
over recovered
Facilities, Waste and
Grounds Services -
(364k) under recovered 
Planning and
Regulatory Services -
721k over recovered 
Roads, Transportation
and Fleet - (174k)
under recovered 
The projected under recovery is
due to lower than budgeted
income from care of gardens
within grounds services and
income received for burials
being less than budget within
streets services. These are
partially offset by a greater
demand for special uplifts within
Waste. 
The forecast over recovery is
mainly due to increased fees for
planning applications. 
The projected under recovery is
due to less than budgeted
Construction Consent income
within Roads.   
Fees and Charges - Dept of the
Authority - 339k over recovered
Facilities, Waste and
Grounds Services -
219k over recovered 
The projected over recovery is
due to an increase in additional
service requests to Waste
services from Housing and
Technical Resources for
additional bin uplifts as well as
an increase in income for Street
Cleansing. This is partially
offset by a loss of income within
Facilities due to the closure of
Red Deer. 
59

Page 60

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)   Roads, Transportation
and Fleet - 100k over
recovered 
The over recovery within Fleet
is in the mainly due to income
received for EV electricity
usage. This partially offsets the
overspend in Transport & Plant.  
Fleet Services - 947k over recovered Roads, Transportation
and Fleet - 947k over
recovered 
The forecast over recovery is in
relation to income for fuel which
offsets the overspend within
Transport & Plant, as well as
over recoveries on vehicle
maintenance, RFL's, casual
and hire management fee. 
Other Income - 22k - over recovered Facilities, Waste and
Grounds Services -
(14k) under recovered 
The projected under recovery is
mainly within Grounds and
relates to grounds maintenance
work.   
Enterprise &
Sustainable
Development - 154k
over recovered 
Roads, Transportation
and Fleet - (119k)
under recovered 
The projected over recovery is
mainly due to the provision for
the dilapidations of Hamilton
Towers within Property
Development. 
The projected under recovery is
due to income for leasing
management fee and pool cars
being less than budget. 
60

Page 61

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Recharges - Departments of the
Authority - 5,379k over recovered
Facilities, Waste and
Grounds Services -
(339k) under recovered 
Roads, Transportation
and Fleet - 5,718k over
recovered 
The under recovery is within
Grounds and mainly relates to
Adoption Monies not being
drawn down and a reduction in
additional cleaning requests
within facilities. 
The over recovery is due to
employee recharges within
Fleet and income recovered
from Capital works within the
Roads Construction Unit. 
* The underlined variances represent new variances since the last report. 
61

Page 62

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12Period 12Period 12
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (ProjectedVariance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 0 0 1 (1) 1 (1) 0 1 0 0
APT & C BASIC 83,976 3,410 80,096 5,720 80,030 5,872 85,891 69,484 80,720 5,171
APT & C OVERTIME 2,553 (1,213) 2,473 (1,172) 2,486 (1,185) 1,301 2,110 2,322 (1,021)
APT & C SUPERANNUATION 5,483 286 4,926 757 4,923 766 5,662 4,372 4,921 741
APT & C NIC 9,698 274 9,799 68 9,788 89 9,915 8,453 9,786 129
MANUAL WORKERS  BASIC 0 0 0 0 0 0 0 (4) 0 0
MANUAL SESSIONAL STAFF BASIC 2,054 0 2,054 0 2,054 0 2,054 2,135 2,054 0
MANUAL SESSIONAL STAFF OVERTIME 0 0 0 0 0 0 0 36 0 0
MANUAL SESSIONAL STAFF SUPERANNUATION 161 0 161 0 161 0 161 90 161 0
MANUAL SESSIONAL STAFF NIC 181 0 181 0 181 0 181 232 181 0
TRAVEL AND SUBSISTENCE 104 0 70 39 70 39 109 69 70 39
OTHER EMPLOYEE COSTS 207 (20) 193 (6) 193 (6) 187 24 193 (6)
PENSION INCREASES 1,219 (105) 1,164 (46) 1,179 (61) 1,118 1,066 1,179 (61)
STRAIN ON THE FUND 0 0 2 (2) 2 (2) 0 2 2 (2)
COST LABOUR ALLOCATION (64) 0 (65) 1 (65) 1 (64) (65) (65) 1
EMPLOYEE COSTS 105,572 2,632 101,055 5,358 101,003 5,512 106,515 88,005 101,524 4,991
PROPERTY COSTS
RATES 1,201 (85) 1,120 (4) 1,018 98 1,116 1,016 1,021 95
SCOTTISH WATER - UNMETERED CHARGES 8 0 5 3 5 3 8 0 5 3
SCOTTISH WATER - METERED CHARGES 174 0 189 (13) 189 (13) 176 158 197 (21)
RENT 222 (21) 219 (5) 220 (5) 215 138 220 (5)
SERVICE CHARGE 42 0 51 (9) 51 (9) 42 37 51 (9)
FACTORING CHARGES 26 (10) 27 (12) 27 (12) 15 27 27 (12)
PROPERTY INSURANCE 288 0 301 7 301 7 308 280 301 7
SECURITY COSTS 55 (3) 36 16 36 16 52 6 36 16
GROUND MAINTENANCE 8 0 12 (4) 12 (4) 8 15 12 (4)
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 (10) 19 (19) 19 (19) 0 41 45 (45)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTORS 76 (40) 499 (463) 499 (463) 36 101 498 (462)
LIFE CYCLE MAINTENANCE 0 0 0 0 0 0 0 12 2 (2)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTORS 255 11 409 (36) 409 (36) 373 372 410 (37)
ADAPTIONS - INTERNAL CONTRACTOR 0 0 0 0 0 0 0 1 0 0
GAS HEATING LEASE COSTS 0 0 1 (1) 1 (1) 0 1 1 (1)
ELECTRICITY - CONTRACT 4,737 0 4,544 193 4,544 193 4,737 3,317 4,524 213
ELECTRICITY - NON CONTRACT 0 0 2 (2) 2 (2) 0 3 2 (2)
GAS 1,182 0 1,152 30 1,152 30 1,182 1,492 1,167 15
HEATING OIL 14 0 2 12 2 12 14 (1) 2 12
FIXTURE & FITTINGS 0 0 0 0 0 0 0 5 0 0
CLEANING CONTRACT 20 0 24 (4) 24 (4) 20 20 17 3
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 739 (155) 1,031 (316) 1,031 (316) 715 690 1,031 (316)
HEALTH & HYGIENE MATERIALS 43 0 137 (94) 137 (94) 43 97 137 (94)
PEST CONTROL 0 0 0 0 0 0 0 1 0 0
REFUSE UPLIFT 505 (100) 500 (95) 500 (95) 405 379 500 (95)
REMOVAL & STORAGE COSTS 0 0 1 (1) 1 (1) 0 2 1 (1)
OTHER PROPERTY COSTS 30 (1) 338 (303) 338 (303) 35 348 643 (608)
OFFICE ACCOMODATION FACILITIES 4 0 4 0 4 0 4 4 4 0
PROPERTY COSTS 9,639 (414) 10,623 (1,120) 10,522 (1,018) 9,504 8,562 10,854 (1,350)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 688 (83) 918 (246) 918 (246) 672 608 1,040 (368)
COMPUTER EQUIPMENT RENTAL 6 0 8 (2) 8 (2) 6 0 8 (2)
COMPUTER EQUIPMENT MAINTENANCE 70 (24) 36 10 36 10 46 6 36 10
I.T. EQUIPMENT MAINT-CONTRACT 234 (16) 231 (14) 231 (14) 217 66 231 (14)
I.T. ELECTRONIC MESSAGING 3 0 1 2 1 2 3 0 1 2
EQUIPMENT, APPARATUS AND TOOLS 1,378 (222) 2,431 (347) 2,332 (247) 2,085 1,027 1,807 278
SMALL TOOLS 107 0 87 20 87 20 107 3 87 20
ADAPTATIONS FOR CLIENTS 0 0 16 (16) 16 (16) 0 21 16 (16)
FURNITURE - OFFICE 8 0 12 (4) 12 (4) 8 12 13 (5)
FURNITURE - GENERAL 0 0 0 0 0 0 0 2 0 0
FURNISHINGS (INCL. CROCKERY & LINEN) 110 0 110 0 110 0 110 60 110 0
MATERIALS 7,534 (114) 9,621 (2,036) 9,622 (2,037) 7,585 5,058 9,681 (2,096)
STOCK/STORE ISSUES 0 0 0 0 0 0 0 1,598 0 0
MATERIALS, APPARATUS AND EQUIPMENT 12 0 7 5 7 5 12 7 7 5
AUDIO VISUAL 0 0 0 0 0 0 0 1 0 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 27 (25) 1 1 1 1 2 0 1 1
PROVISIONS 0 0 3 (3) 3 (3) 0 8 4 (4)
FOOD PURCHASES 5,574 0 5,946 (223) 5,891 (223) 5,668 4,597 5,891 (223)
BEVERAGES 5 (5) 9 (9) 9 (9) 0 13 9 (9)
SCHOOL MILK 50 0 50 0 114 0 114 102 114 0
RECHARGES OF DIRECT FOOD COSTS 68 0 68 0 68 0 68 (10) 68 0
OPENING STOCK 0 0 0 0 0 0 0 2,637 0 0
CLOSING STOCK 0 0 0 0 0 0 0 (2,646) 0 0
PROTECTIVE CLOTHING & UNIFORMS 323 (85) 411 (151) 411 (151) 260 396 410 (150)
LAUNDRY COSTS 10 0 14 (4) 14 (4) 10 13 14 (4)
OTHER SUPPLIES AND SERVICES 889 (2) 573 13 518 13 531 121 288 243
MAJOR SUPPLY OF ELECTRICAL POWER 2,368 0 2,380 (11) 2,380 (11) 2,369 2,231 2,380 (11)
OUTSOURCED MAIL 5 (4) 8 (7) 8 (7) 1 10 8 (7)
DELIVERY CHARGE 1 0 1 0 1 0 1 2 1 0
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 (1) 0 0
SUPPLIES AND SERVICES 19,470 (580) 22,942 (3,022) 22,798 (2,923) 19,875 15,942 22,225 (2,350)
62

Page 63

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12Period 12Period 12
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (ProjectedVariance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 730 (730) 730 (730) 0 (2,139) 709 (709)
PURCHASE OF PLANT 63 0 22 (16) 22 (16) 6 202 22 (16)
FLEET SERVICES - DRIVERS 108 (45) 107 (42) 107 (42) 65 107 107 (42)
FLEET SERVICES - FUEL 3,099 (100) 3,521 (522) 3,521 (522) 2,999 3,073 3,521 (522)
FLEET SERVICES - VEHICLE HIRE 1,229 0 1,190 39 1,190 39 1,229 1,338 1,190 39
POOL CAR CHARGES - RENTAL 85 (16) 111 (7) 111 (7) 104 91 111 (7)
POOL CAR CHARGES - FUEL 22 0 0 19 0 19 19 0 0 19
POOL CAR CHARGES - ADDITIONAL COSTS 6 0 5 1 5 1 6 5 5 1
OTHER TRANSPORT COSTS 78 0 46 27 46 27 73 48 44 29
TRANSPORT INSURANCE 93 0 93 0 93 0 93 93 93 0
LICENCES 491 0 599 (108) 599 (108) 491 430 599 (108)
FLEET SERVICES - REPAIRS 2,910 (265) 3,421 (804) 3,421 (804) 2,617 3,010 3,361 (744)
PLANT SERVICES 19 0 19 0 19 0 19 10 19 0
FLEET SERVICE CHARGES - VEHICLE MAINTENANCE 4,442 (160) 4,922 (517) 4,922 (517) 4,405 4,410 4,916 (511)
FLEET SERVICE CHARGES - PLANT MAINTENANCE 269 0 358 3 358 3 361 238 358 3
FLEET SERVICE CHARGES - ASSET MODIFICATION 68 0 213 (145) 213 (145) 68 47 210 (142)
FLEET SERVICE CHARGES - LEASING 4,629 99 4,604 201 4,604 200 4,804 2,444 4,586 218
FLEET SERVICE CHARGES - HIRED VEHICLES 1,384 (175) 1,182 251 1,182 251 1,433 1,044 1,175 258
FLEET SERVICE CHARGES - CONTRACT HIRE 189 0 243 (44) 248 (49) 199 216 259 (60)
FLEET SERVICE CHARGES - ROAD FUND LICENCE 235 0 193 48 193 48 241 187 211 30
FLEET SERVICE CHARGES - FUEL 3,016 0 2,561 474 2,561 473 3,034 2,167 2,578 456
FLEET SERVICE CHARGES - DRIVERS 72 (14) 71 (15) 71 (15) 56 71 71 (15)
HIRE OF EXTERNAL VEHICLES 68 0 33 35 33 35 68 0 33 35
HIRE OF EXTERNAL PLANT 328 0 275 3 275 3 278 261 275 3
HIRE OF SKIPS 17 0 24 (7) 24 (7) 17 22 24 (7)
PUPIL TRANSPORT - SPECIAL EDUCATION 298 0 298 0 298 0 298 122 298 0
TRANSPORT AND PLANT 23,218 (676) 24,841 (1,856) 24,846 (1,863) 22,983 17,497 24,775 (1,792)
ADMINISTRATION
PRINTING AND STATIONERY 242 (31) 240 (24) 240 (24) 216 219 248 (32)
TELEPHONES 102 0 59 39 59 39 98 30 59 39
MOBILE PHONES 67 0 74 (14) 74 (14) 60 83 75 (15)
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 8 0 8 0 8 0 8 0 8 0
ADVERTISING - OTHER 81 0 104 (10) 104 (10) 94 80 105 (11)
POSTAGES/COURIERS 34 (2) 53 (22) 53 (22) 31 48 53 (22)
MEMBERSHIP FEES/SUBSCRIPTIONS 75 (23) 101 (17) 101 (17) 84 70 101 (17)
INSURANCE 260 0 261 (1) 261 (1) 260 262 261 (1)
MEDICAL COSTS 76 (69) 56 (49) 56 (49) 7 52 58 (51)
LEGAL EXPENSES 6 0 45 (33) 45 (33) 12 21 38 (26)
HOSPITALITY / CIVIC RECOGNITION 3 0 2 1 2 1 3 0 2 1
INTERNET AGENCY FEES 33 (10) 39 (16) 39 (16) 23 35 39 (16)
SECURITY UPLIFT FEES 17 0 18 (1) 18 (1) 17 15 18 (1)
OTHER ADMIN COSTS 4 0 3 1 3 1 4 3 3 1
TRAINING 27 (16) 106 (95) 106 (95) 11 16 43 (32)
ADMINISTRATION 1,035 (151) 1,169 (241) 1,169 (241) 928 934 1,111 (183)
PAYMENT TO OTHER BODIES
SPTE: ANNUAL BUS SUBSIDY 2,041 0 2,034 0 2,034 0 2,034 2,034 2,034 0
SPTE: BUS OTHER 258 0 258 0 258 0 258 258 258 0
SPTE: FERRIES 29 0 29 0 29 0 29 29 29 0
SPTE: UNDERGROUND 1,318 0 1,318 0 1,318 0 1,318 1,318 1,318 0
SPTE: OTHER 1,727 0 1,727 0 1,727 0 1,727 1,727 1,727 0
SPTE: MAINTENANCE OF BUS SHELTERS AND STOPS 131 0 131 0 131 0 131 131 131 0
YOUTH EMPLOYMENT TRAINING 0 0 0 0 0 0 0 (2) 0 0
OTHER LOCAL AUTHORITIES 73 0 81 (8) 81 (8) 73 82 93 (20)
GRANTS TO VOLUNTARY ORGANISATIONS 22 0 20 2 20 2 22 0 20 2
PAYMENTS TO VOLUNTARY ORGANISATIONS 39 0 39 0 39 0 39 1 39 0
PAYMENTS TO OTHER BODIES 10,753 (21) 11,248 (239) 11,854 (703) 11,151 6,261 11,855 (704)
EXTERNAL AUDIT FEES 3 0 3 0 3 0 3 4 3 0
ACTIVITIES PROGRAMME 439 0 272 167 272 167 439 247 272 167
PAYMENT TO OTHER BODIES 16,833 (21) 17,160 (78) 17,766 (542) 17,224 12,090 17,779 (555)
PAYMENT TO CONTRACTORS
PAYMENT TO TRADING SERVICES CONTRACTOR 284 0 3,036 (2,618) 3,036 (2,618) 418 74 3,205 (2,787)
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 302 0 300 2 300 2 302 216 300 2
PAYMENT TO PRIVATE CONTRACTOR 39,432 (220) 41,293 (2,052) 41,298 (2,045) 39,253 34,907 41,114 (1,861)
PAYMENT TO INTERNAL CONSULTANT 121 0 119 0 119 0 119 0 119 0
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 0 0 50 0 50 0 50 54 53 (3)
PAYMENT TO CONTRACTORS 40,139 (220) 44,798 (4,668) 44,803 (4,661) 40,142 35,251 44,791 (4,649)
TRANSFER PAYMENTS
CONCESSIONARY FARES 617 0 625 0 625 0 625 625 625 0
TRANSFER PAYMENTS 617 0 625 0 625 0 625 625 625 0
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 211 (20) 210 (19) 210 (19) 191 38 207 (16)
FINANCING CHARGES 211 (20) 210 (19) 210 (19) 191 38 207 (16)
TOTAL EXPENDITURE 216,734 550 223,423 (5,646) 223,742 (5,755) 217,987 178,944 223,891 (5,904)
63

Page 64

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12Period 12Period 12
Community & Enterprise Resources Summary Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (ProjectedVariance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
INCOME
MILK SUBSIDIES FROM THE E.U. (37) 0 (37) 0 (37) 0 (37) 0 (37) 0
CONTRIBUTIONS FROM OTHER BODIES (21,356) 0 (21,552) (52) (21,553) (52) (21,605) (11,801) (21,551) (54)
ERDF GRANT 0 0 0 0 0 0 0 (1,156) 0 0
ESF GRANT 0 0 0 0 0 0 0 1 0 0
SALES - GENERAL (5,338) (140) (6,475) 998 (6,475) 998 (6,005) (5,230) (6,487) 482
ELECTIONS - ACCOMMODATION USE (11) 11 (4) 4 (4) 4 0 (11) (4) 4
SALES - DEPARTMENTS OF THE AUTHORITY (136) 0 (158) 22 (158) 22 (136) (134) (170) 34
FEES AND CHARGES - GENERAL (11,646) (461) (13,124) 17 (13,233) 126 (12,579) (12,127) (12,762) 183
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (7,074) 27 (7,377) 329 (7,376) 329 (7,047) (7,375) (7,386) 339
RENTAL INCOME (48) 0 (98) 8 (98) 8 (90) (92) (98) 8
FLEET SERVICES (12,680) 13 (13,586) 947 (13,586) 947 (12,639) (11,912) (13,586) 947
OTHER INCOME (2,821) 0 (2,588) 34 (2,588) 34 (2,554) (917) (2,576) 22
RECOVERY FROM CAPITAL (1,333) 0 (612) 26 (612) 26 (586) (512) (612) 26
RECHARGES - DEPARTMENTS OF THE AUTHORITY (23,719) 0 (28,422) 4,779 (28,422) 4,779 (23,643) (21,011) (29,022) 5,379
TOTAL INCOME (86,199) (550) (94,033) 7,112 (94,142) 7,221 (86,921) (72,277) (94,291) 7,370
NET EXPENDITURE 130,535 0 129,390 1,466 129,600 1,466 131,066 106,667 129,600 1,466
64

Page 65

Appendix B
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 20 February 2026 (No.12)
Education Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Education 502.289 501.811 0.478 0.10% 451.717
Total Education Resources 502.289 501.811 0.478 0.10% 451.717
6
65

Page 66

Education Resources Variance Analysis 2025/26 (Period 12) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,411k under Teachers Basic / Superannuation /
National Insurance - (2,766k) over 
APT&C Basic / Superannuation /
National Insurance – 4,309k under 
Premature Retirals - (148k) over 
Schools - (2,766k) over 
Early Years / Support
Services – 4,309k
under 
Schools - (148k) over 
The projected overspend
relates to the increased use of
supply teachers for absence
cover. 
The projected underspend
mainly relates to Early Years
and Support Services posts and
is the result of staff turnover. 
The overspend relates to
increased monthly costs for
historic early retirals due to
inflation levels and the cost of
pensions. 
Supplies &
Services
(82k) over Aids for Clients - (77k) over 
Materials, Apparatus and Equipment -
(269k) over 
Schools - (77k) over 
Schools - (269k) over 
This overspend is due to the
increased demand and cost for
new equipment required by
children in school with complex
physical needs. 
The overspend is due to the
additional cost of per capita
expenditure reflecting the
growth in pupil numbers and
price increase. Contained within
this position is funding for ASL
that will be transferred to
reserves (£0.078m) to support
expenditure commitments to the
end of the school session in
June 2026. 
66

Page 67

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies &
Services (cont.) 
Pupil Equity Fund - 400k under 
Catering Contract - (126k) over 
Schools - 400k under 
Schools - (126k) over
The underspend reflects the
profile of Pupil Equity Fund
(PEF) spend and commitment
across the academic year in
line with school improvement
plans and will therefore be
carried forward to 2026/2027, to
be used in the April to June
2026 school session. 
The overspend is due to an
increased cost for food for
breakfast clubs.
Transport and
Plant
(3,488k) over Fleet Services Charges - (101k) over 
Pupil Transport - ASN - (2,515k) over 
Pupil Transport - Strathclyde
Passenger Transport - (863k) over 
Schools - (101k) over 
Schools - (2,515k) over 
Schools - (863k) over 
This is a demand led service
and reflects the volume of
children requiring ASN transport
to school and increased costs. 
This is a demand led service
and reflects the volume of
children requiring ASN transport
to school and increased costs. 
This is a demand led service
and reflects the volume of
children requiring mainstream
transport to school and
increased costs. 
67

Page 68

Subjective Head Variance  Subjective line Service / amount Explanation
Administration
Costs
(4k) over Telephones/Mobile Phones - (37k)
over 
Conferences - 51k under
Schools - (37k) over 
Early Years - 51k
under 
The overspend relates to higher
than anticipated telephone
costs in schools due to a
change in contract. 
The underspend relates to 
expenditure on Early Years’ 
funded provider meetings being
lower than anticipated. 
Payments to Other
Bodies 
(480k) over  Other Local Authorities - (861k) over 
Payments to Other Bodies - 925k
under 
Independent Schools Places - (522k)
over
Schools - (861k) over 
Early Years - 925k
under 
Schools - (522k) over
The overspend is due to an
increase in the cost of external
school placements within other
local authorities and back dated
charges from another local
authority.   
This projected underspend is
due to less than anticipated
core Early Years spend
including cross boundary
charges to other Local
Authorities. 
This projected overspend
reflects the increased cost of
placements for pupils with
additional support needs in
Independent Schools and is
due to both an increase in the
number of places and the cost
of placements. 
68

Page 69

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors
360k under Payments to Private Contractors -
360k under
Non Schools - 360k
under
The projected underspend
relates to the timing of savings
associated with the renewal of
the insurance arrangements
within the contract this year. 
Transfer Payments 123k under Footwear and Clothing Grants - 123k
under 
Schools - 123k under  This projected underspend
reflects lower than anticipated
expenditure on footwear and
clothing grants during the
financial year, reflecting current
demand. 
Income 2,636k over
recovered
Fees and Charges - Other Local
Authorities - 745k over recovered 
Early Years Fees - 1,850k over
recovered 
Schools - 745k over
recovered 
Early Years - 1,850k
over recovered
This projected over recovery
reflects the increase in income
recovered from other Local
Authorities for children
attending schools in South
Lanarkshire. This income is
used to support the cost of
external placements. 
This projected over recovery in
Early Years’ fees relates to
increased uptake of available
nursery places beyond 1140
hours. 
69

Page 70

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
TEACHERS BASIC 188,512 0 193,938 475 194,170 443 194,290 169,815 193,855 435
TEACHERS SUPERANNUATION 49,027 0 50,566 0 50,570 0 50,593 43,366 50,593 0
TEACHERS NI 24,794 0 25,494 0 25,496 0 25,507 22,883 25,507 0
FIXED TERM CONTRACT - TEACHER  - APT&C BASIC 3,829 (2,420) 4,319 (2,811) 4,344 (2,784) 1,610 2,338 4,811 (3,201)
FIXED TERM CONTRACT - TEACHER  SUPERANNUATION 0 0 0 0 0 0 0 301 0 0
SUPPLY TEACHERS - APT&C BASIC 0 0 0 0 0 0 0 699 0 0
SUPPLY TEACHERS - APT&C SUPERANNUATION 0 0 0 0 0 0 0 683 0 0
SUPPLY TEACHERS - APT&C NIC 0 0 0 0 0 0 0 89 0 0
APT&C BASIC 75,167 2,535 72,486 3,544 72,405 3,630 75,915 62,686 72,225 3,690
APT&C OVERTIME 6 0 20 0 27 0 29 426 29 0
APT&C SUPERANNUATION 5,333 137 5,164 204 5,154 213 5,353 4,059 5,138 215
APT&C NIC 7,745 257 7,511 384 7,496 400 7,883 7,359 7,479 404
TRAVEL AND SUBSISTANCE 207 0 203 33 197 33 221 141 188 33
PENSION INCREASES 434 0 441 (7) 441 (7) 434 402 441 (7)
PREMATURE RETIRALS 5,191 (150) 5,189 (148) 5,189 (148) 5,041 4,720 5,189 (148)
STRAIN ON THE FUND 0 0 10 (10) 10 (10) 0 6 10 (10)
TEACHERS TRAINING 0 0 (9) 0 (9) 0 (9) 1 (9) 0
CONSULTANTS 0 0 0 0 0 0 0 6 0 0
EMPLOYEE COSTS 360,245 359 365,332 1,664 365,490 1,770 366,867 319,980 365,456 1,411
PROPERTY COSTS
RATES 19,398 0 19,374 24 19,374 24 19,398 19,374 19,374 24
SCOTTISH AKATER - UNMETERED CHARGES 0 0 2 (2) 2 (2) 0 0 2 (2)
SCOTTISH WATER - METERED (DRAINAGE) CHARGES 1,385 0 1,388 (3) 1,388 (3) 1,385 1,044 1,388 (3)
SCOTTISH WATER - METERED CHARGES 784 0 785 (1) 844 (1) 843 625 844 (1)
RENT 337 (29) 348 15 348 15 363 229 348 15
SERVICE CHARGE 58 0 58 0 58 0 58 76 58 0
PROPERTY INSURANCE 484 0 508 (24) 508 (24) 484 499 508 (24)
SECURITY COSTS 68 0 74 (4) 87 (4) 74 65 78 (4)GROUNDS MAINTENANCE ADDITIONAL AKORKS 0 0 0 0 0 0 0 0 0 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 60 0 56 0 72 0 62 30 62 0
LIFE CYCLE MAINTENANCE 2 0 2 0 2 0 2 2 2 0
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 29 0 37 0 37 0 45 41 45 0
ADAPTIONS - INTERNAL CONTRACTORS 121 0 102 0 86 0 105 73 105 0
ELECTRICITY  - CONTRACT 7,253 0 7,278 (25) 7,278 (25) 7,253 5,479 7,253 0
GAS 4,074 0 4,055 19 3,931 19 3,950 2,553 3,950 0
HEATING OIL 164 0 164 0 105 0 105 61 105 0
SOLID FUEL 171 0 171 0 295 0 295 208 295 0
FIXTURE & FITTINGS 1 0 2 0 2 0 2 2 2 0
JANITOR SERVICE 158 0 147 4 158 4 115 111 111 4
CLEANING CONTRACT 659 0 515 (12) 515 (12) 503 515 515 (12)
CLEANING OUTWITH CONTRACT 8 0 3 5 3 5 8 0 3 5
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 578 (145) 469 (4) 459 (4) 458 406 462 (4)
HEALTH & HYGIENE MATERIALS 76 0 52 0 52 0 52 30 52 0
AKINDOAK CLEANING 3 0 2 0 2 0 2 0 2 0
REFUSE UPLIFT 17 0 24 (7) 24 (7) 18 27 30 (12)
REMOVAL & STORAGE COSTS 1 0 1 0 1 0 1 1 1 0
OTHER PROPERTY COSTS 413 0 0 17 0 17 18 11 1 17
ACCOMMODATION RECHARGE TO USERS 882 0 882 0 882 0 882 882 882 0
PROPERTY COSTS 37,184 (174) 36,499 2 36,513 2 36,481 32,344 36,478 3
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 140 0 330 0 332 0 399 385 399 0
COMPUTER EQUIPMENT RENTAL 1 0 0 1 0 1 1 0 0 1
I.T. EQUIPMENT MAINT-CONTRACT 2,809 0 3,371 (3) 3,194 (3) 3,326 2,968 3,329 (3)
I.T. ELECTRONIC MESSAGING 8 0 21 0 39 0 24 20 24 0
EQUIPMENT, APPARATUS AND TOOLS 35 0 37 (2) 36 (2) 25 17 27 (2)
SMALL TOOLS 2 0 4 0 4 0 4 3 4 0
AIDS FOR CLIENTS 189 (72) 204 (77) 207 (77) 134 195 211 (77)
ADAPTATIONS FOR CLIENTS 27 0 54 0 59 0 51 50 51 0
SUPPLIES FOR CLIENTS 5 0 9 0 9 0 12 12 12 0
FURNITURE - OFFICE 7 0 14 0 14 0 13 13 13 0
FURNITURE - GENERAL 81 0 87 0 90 0 90 90 90 0
FURNISHINGS (INCL. CROCKERY & LINEN) 6 0 9 0 10 0 11 11 11 0
MATERIALS 32 0 35 0 36 0 36 36 36 0
MATERIALS, APPARATUS AND EQUIPMENT 1,792 (320) 3,065 (269) 3,296 (269) 3,175 2,243 3,444 (269)
PUPIL EQUITY FUNDING 4,117 0 2,584 400 1,910 400 1,778 38 1,378 400
SAC FUNDING 269 0 358 0 350 0 358 0 358 0
LIBRARY/RESOURCE CENTREMATERIALS 71 0 60 0 70 0 76 58 76 0
AUDIO VISUAL 6 0 8 0 8 0 8 8 8 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 18 0 27 0 32 0 37 31 37 0
TV LICENCES - EDUCATION 26 0 26 0 28 0 27 16 27 0
PROVISIONS 61 0 212 (11) 254 (11) 270 267 281 (11)
FOOD PURCHASES 103 0 123 0 130 0 156 147 156 0
BEVERAGES 2 0 4 0 10 0 12 11 12 0
SCHOOL MILK 15 0 25 0 25 0 25 24 25 0
NURSERY MILK 100 0 100 0 100 0 66 66 66 0
NURSERY FRUIT/VEG 98 0 4 0 4 0 0 2 0 0
RECHARGE OF DIRECT FOOD COSTS 4 0 8 0 8 0 10 9 10 0
PROTECTIVE CLOTHING & UNIFORMS 86 0 92 0 113 0 103 78 103 0
LAUNDRY COSTS 1 0 0 0 1 0 1 0 1 0
OTHER SUPPLIES AND SERVICES 24 0 21 0 18 0 32 1 32 0
HEALTH AND SAFETY 20 0 15 5 15 5 9 0 4 5
CATERING - CONTRACT 2,803 0 2,807 (126) 2,807 (126) 2,634 2,733 2,760 (126)
CATERING - OUTWITH CONTRACT 7 0 7 0 8 0 7 5 7 0
CATERING - EXTERNAL 7 0 12 0 14 0 13 13 13 0
ARTIST FEES / PERFORMING ARTS / ENTERTA 1 0 3 0 3 0 3 3 3 0
DELIVERY CHARGE 3 0 4 0 4 0 5 5 5 0
SUPPLIES AND SERVICES 12,976 (392) 13,740 (82) 13,238 (82) 12,931 9,558 13,013 (82)
70

Page 71

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Education Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
POOL CAR CHARGES-RENTAL 2 0 3 (1) 2 (1) 1 2 2 (1)
OTHER TRANSPORT COSTS 2 0 2 0 2 0 2 1 2 0
INSURANCE 3 0 3 0 3 0 3 3 3 0
FLEET SERVICE CHARGES 1,822 0 2,269 (101) 2,269 (101) 2,168 2,131 2,269 (101)
HIRE OF EXTERNAL VEHICLES 183 0 249 0 262 0 266 274 266 0
HIRE OF SKIPS 7 0 8 0 9 0 12 17 17 (5)
EXTERNAL TRANSPORT CONTRACT 4 0 7 0 9 0 15 18 18 (3)
PUPIL TRANSPORT-SPECIAL EDUCATIONAL NEEDS 8,386 (2,531) 8,316 (2,459) 8,339 (2,482) 5,858 6,537 8,373 (2,515)
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 9,702 (279) 10,250 (826) 10,287 (863) 9,424 11,888 10,287 (863)
PUPIL TRANSPORT - OTHER 175 0 192 0 197 0 200 89 200 0
TAXI CHARGES - CONTRACTED 0 0 0 0 0 0 0 2 0 0
TRANSPORT AND PLANT 20,286 (2,810) 21,299 (3,387) 21,379 (3,447) 17,949 20,962 21,437 (3,488)
ADMINISTRATION
PRINTING AND STATIONERY 456 0 525 13 556 13 645 604 632 13
TELEPHONES 233 0 265 (37) 262 (37) 221 164 258 (37)
MOBILE PHONES 13 0 16 0 16 0 20 29 20 0
ADVERTISING - OF COUNCIL SERVICE AVAILA 3 0 0 3 0 1 1 0 0 1
ADVERTISING - OTHER 11 0 7 4 7 4 11 0 7 4
POSTAGES/COURIERS 62 0 54 4 49 4 46 17 42 4
MEMBERSHIP FEES/SUBSCRIPTIONS 182 0 261 0 447 0 330 316 330 0
INSURANCE 76 0 76 0 76 0 76 76 76 0
MEDICAL COSTS 21 0 32 (6) 28 (6) 24 31 35 (11)
LEGAL EXPENSES 12 (12) 24 (24) 24 (24) 0 16 24 (24)
HOSPITALITY / CIVIC RECOGNITION 2 0 3 0 3 0 4 2 4 0
SECURITY UPLIFT FEES 4 0 7 0 7 0 8 8 4 4
OTHER ADMIN COSTS 2 0 0 2 0 2 2 0 0 2
CONFERENCES - OFFICIALS (incl associated costs) 0 52 1 51 1 51 52 0 1 51
TRAINING 497 0 432 (11) 495 (11) 475 458 486 (11)
ADMINISTRATION 1,574 40 1,703 (1) 1,971 (3) 1,915 1,721 1,919 (4)
PAYMENT TO OTHER BODIES
YOUTH EMPLOYMENT TRAINING 0 0 2 0 2 0 2 2 2 0
OTHER COMMITTEES OF THE AUTHORITY 28 (28) 33 (8) 33 (8) 25 29 33 (8)
OTHER LOCAL AUTHORITIES 1,456 (24) 2,294 (861) 2,294 (861) 1,433 1,343 2,294 (861)
SCOTTISH QUALIFICATIONS AUTHORITY 1,574 (11) 1,585 (22) 1,585 (22) 1,563 1,582 1,585 (22)
PAYMENTS TO VOLUNTARY ORGANISATIONS 10 0 10 0 10 0 10 8 10 0
PAYMENTS TO OTHER BODIES 20,690 800 20,409 903 20,411 925 21,557 19,989 20,632 925
INDEPENDENT SCHOOL PLACES 4,632 (825) 4,760 (953) 4,760 (953) 3,807 3,466 4,329 (522)
CONTRACT SPEECH THERAPY 678 0 678 0 678 0 678 509 678 0
SCHOOL ACTIVITIES 171 0 234 0 297 0 320 258 320 0
RESEARCH GRANTS - EDUCATION 39 0 43 0 45 0 46 47 46 0
PARENT COUNCILS (PREV.SCHOOL BOARDS) 28 0 20 8 20 8 27 29 19 8
P.E. FACILITIES 73 0 65 0 59 0 40 12 40 0
ACTIVITIES PROGRAMME 196 0 296 0 371 0 427 427 427 0
COUNSELLING 1,364 0 1,364 0 1,364 0 1,480 1,111 1,480 0
COPYRIGHT AGREEMENT 228 0 228 0 222 0 222 228 222 0
VAT FREE EXCURSIONS - EDUCATION 12 0 67 0 79 0 73 73 73 0
PRIVATE INDIVIDUALS - GENERAL 3 0 4 0 4 0 3 3 3 0
PAYMENT TO OTHER BODIES 31,182 (88) 32,092 (933) 32,234 (911) 31,713 29,116 32,193 (480)
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 0 0 0 3 0 0
PAYMENT TO PRIVATE CONTRACTOR 47,693 360 47,695 360 47,695 360 48,069 43,175 47,709 360
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 2 0 9 0 9 0 4 3 4 0
PAYMENT TO CONTRACTORS 47,695 360 47,704 360 47,704 360 48,073 43,181 47,713 360
TRANSFER PAYMENTS
RENT REBATES 371 0 563 0 638 0 716 716 716 0
FOOTWEAR & CLOTHING GRANTS 2,312 0 2,198 114 2,198 114 2,312 2,158 2,189 123
WORK EXPERIENCE 16 0 13 0 8 0 6 0 6 0
TRANSFER PAYMENTS 2,699 0 2,774 114 2,844 114 3,034 2,874 2,911 123
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL 3 0 0 3 0 3 3 0 0 3
I.T. EQUIPMENT LEASING - CONTRACT 403 0 396 (4) 396 (4) 379 269 383 (4)
FINANCING CHARGES 406 0 396 (1) 396 (1) 382 269 383 (1)
TOTAL EXPENDITURE 514,247 (2,705) 521,539 (2,264) 521,769 (2,198) 519,345 460,005 521,503 (2,158)
INCOME
GOVERNMENT GRANT - GAELIC EDUCATION (170) 0 (175) 5 (175) 5 (170) (131) (175) 5
GOVERNMENT GRANTS - OTHER EDUCATION GRANTS (12,909) 0 (13,106) 0 (13,181) 0 (13,221) (3,352) (13,221) 0
CONTRIBUTIONS FROM OTHER BODIES (1,124) 0 (1,152) 0 (1,265) 0 (1,306) (1,238) (1,306) 0
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (1,544) 775 (1,514) 745 (1,514) 745 (769) (340) (1,514) 745
PLAYGROUP ACCOMMODATION CHARGE (20) 10 (21) 9 (21) 9 (12) (9) (21) 9
EARLY YEARS FEES (2,572) 1,920 (2,608) 1,956 (2,542) 1,890 (652) (2,280) (2,502) 1,850
RENTAL INCOME (20) 0 (17) (3) (17) (3) (20) (15) (17) (3)
OTHER INCOME (24) 0 (54) 30 (54) 30 (24) (41) (54) 30
ACCOMMODATION INCOME FROM USERS (882) 0 (882) 0 (882) 0 (882) (882) (882) 0
INCOME (19,265) 2,705 (19,529) 2,742 (19,651) 2,676 (17,056) (8,288) (19,692) 2,636
NET EXPENDITURE 494,982 0 502,010 478 502,118 478 502,289 451,717 501,811 478
71

Page 72

72

Page 73

Appendix C
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 20 February 2026 (No.12)
Finance and Corporate Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Finance Services - Strategy 2.311 2.317 (0.006) (0.26%) 3.471
Finance Services - Transactions 18.955 17.981 0.974 5.14% 15.131
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.430
Information Technology Services 8.512 8.650 (0.138) (1.62%) 11.328
Communications and Strategy Services 2.530 2.307 0.223 8.81% 2.402
Administration and Licensing Services 4.985 5.003 (0.018) (0.36%) 5.299
Personnel Services 6.800 6.975 (0.175) (2.57%) 6.979
Total Finance and Corporate Resources 44.456 43.578 0.878 1.97% 45.040
6
73

Page 74

Finance and Corporate Resources Variance Analysis 2025/26 (Period 12) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs  85k under  APT&C Basic, Superannuation, NI –
(119k) over
Finance Services
(Strategy) – (16k) over 
The projected overspend is
due to lower than budgeted
turnover during the year.   
Admin, Legal and
Licensing – (66k) over 
IT Services – (113k)
over 
Personnel – (67k) over 
Communications and
Strategy – 122k under 
The projected underspend is
due to vacant posts within the
Service.   
Finance Services
(Transactions) – 245k
under 
APT&C Overtime – (24k) over Finance Services
(Transactions) – (14k)
over 
Overtime costs have arisen
due to staffing vacancies and
absences, combined with
minimum staffing
requirements and unplanned
operational pressures,
requiring additional hours to
maintain service delivery. 
Property Costs 835k under Other Property Costs – 871k under Finance Services
(Transactions) – 878k
under 
The projected underspend
reflects less than budgeted
spend on Empty Property
Relief. 
74

Page 75

Subjective Head Variance  Subjective line Service / amount Explanation
Supplies and Services (191k) over Computer Equipment Purchase –
(160k) over
Finance Services
(Transactions) – (94k)
over 
The projected overspend is
due to Maintenance of Fire
and Intruder Alarms. 
Admin, Legal and
Licensing – (38k) over
The projected overspend is
due to new equipment
requirements for the Area
Committees.  
I.T. Electronic Maintenance – Contract
- (52k) over
Finance Services
(Transactions) – (32k)
over 
The projected overspend is
due to higher than budgeted
charges for IT leasing
charges. 
Materials – 39k under Communications and
Strategy – 39k under
The projected underspend
reflects less than budgeted
spend on paper and
shredding. 
Outsourced Mail – (41k) over Finance Services
(Transactions) – (41k)
over
The projected overspend
reflects additional postage
costs required for service
delivery. 
Administration (194k) over Postages and Couriers – (177k) over  Finance Services
(Transactions) – (154k)
over 
The projected overspend
reflects additional postage
costs required for service
delivery.  
Medical Costs – 30k under  Personnel – 36k under The projected underspend is
due to lower than budgeted
medical charges offset by the
income.
75

Page 76

Subjective Head Variance  Subjective line Service / amount Explanation
Administration (cont.)  Members Allowances – 66k under  Administration, Legal
and Licensing – 66k
under
The projected underspend is
due to reduced
superannuation contributions
in the financial year.  
Training – (61k) over IT Services – (37k) over  The projected overspend
relates to Fusion Support
Training. 
Finance Services
(Transactions) – (20k)
over 
The projected overspend
relates to additional
Procurement Training. 
Transfer Payments 494k under Rent Allowance – 440k under 
Rent Rebates – 54k under
Finance Services
(Transactions) – 451k
under 
Finance Services
(Transactions) – 53k
under
The underspend in these
lines reflects the demand-led
spend on Rent Allowance
and Rent Rebates and is
offset by an under-recovery
of Income (below).
Financing Charges  (138k) over IT Equipment Leasing Contract –
(134k) over
Personnel – (33k) over 
Finance Services
(Transactions) – (41k)
over
Admin, Legal and
Licensing – (29k) over 
The projected overspend in
Financing Charges is due to
higher than budgeted IT
leasing charges and is offset
by an over recovery in IT
Services - Other Income
(below).
Income  27k over
recovered
Statutory Additions – Cost of
Collection – 114k over recovered 
Finance Services
(Transactions) – 114k
over recovered 
The projected over-recovery
of income relates to Non-
Domestic Rates.
76

Page 77

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Rent Rebates Subsidy – 69k over
recovered 
Finance Services
(Transactions) – 69k
over recovered 
The projected under recovery
in these lines is offset by the
demand-
led underspend in Transfer
Payments (above). 
Rent Allowance Subsidy – (266k)
under recovered
Finance Services
(Transactions) – (263k)
under recovered 
Contributions from Other Bodies –
(63k) under recovered 
Finance Services
(Transactions) – (60k)
under recovered 
The under-recovery reflects
lower than budgeted income
for Housing Benefit
overpayments as a result of
the final migration from
legacy benefits to universal
credit for working age. 
Fees and Charges – General – 429k
over recovered
Finance Services
(Transactions) – 304k
over recovered 
The projected over-recovery
of income reflects additional
commission received from
Scottish Water for the 
collection of water and
sewage and blue badge
applications. 
Admin, Legal and
Licensing – 100k over
recovered
The projected over-recovery
of income reflects renewal
fees for private hires and
operators. 
77

Page 78

Subjective Head Variance  Subjective line Service / amount Explanation
Income (cont.)  Fees and Charges – Departments of
the Authority – 68k over recovered 
Communications and
Strategy – 72k over
recovered
The projected over-recovery
reflects the demand for Royal
Mail postages and
outsourced mail. 
Other Income – (302k) under
recovered
Finance Services
(Transactions) – (300k)
under recovered 
The reflects lower than
budgeted income for Housing
Benefit overpayments as a
result of the final migration
from legacy benefits to
universal credit for working
age. 
Personnel – (44k)
under recovered 
The projected under-recovery
is due to lower than expected
level of medical charges
offset by overspend in
Administration cost (above). 
IT Services – 42k over
recovered 
The over-recovery of income
reflects the increased
recharges of IT spend to
Resources and is offset by
overspend in Financing
Charges (above). 
* The underlined variances represent new variances since the last report.
78

Page 79

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT & C BASIC 28,911 (165) 28,836 121 29,021 (66) 29,109 25,381 29,038 71
APT & C OVERTIME 109 (11) 162 (64) 141 (43) 98 163 122 (24)
APT & C SUPERANNUATION 1,854 38 1,838 63 1,835 66 1,914 1,606 1,819 95
APT & C NIC 3,715 (192) 3,699 (155) 3,647 (103) 3,557 3,220 3,604 (47)
APT & C TRAVEL EXPENSES (25) 27 3 (1) 3 (1) 2 21 1 1
TRAVEL AND SUBSISTANCE 1 0 1 0 1 0 1 0 0 1
MSC TRAINEES BASIC 0 0 0 0 0 0 0 4 0 0
OTHER EMPLOYEE COSTS 0 0 180 0 0 180 0 0 0 0
PENSION INCREASES 992 0 992 0 992 0 992 945 1,004 (12)
EMPLOYEE COSTS 35,557 (303) 35,711 (36) 35,640 33 35,673 31,340 35,588 85
PROPERTY COSTS
RATES 0 0 12 0 12 0 12 12 12 0
SCOTTISH WATER - METERED CHARGES 0 0 0 0 0 0 0 1 1 (1)
RENT 4 0 4 0 4 0 4 12 12 (8)
SECURITY COSTS 141 (20) 141 (20) 141 (20) 121 122 141 (20)
REPAIRS & MAINTENANCE - INTERNAL CONTRATOR 0 0 3 0 3 0 3 1 3 0
ELECTRICITY  - CONTRACT 0 0 3 0 3 0 3 8 8 (5)
FIXTURE & FITTINGS 1,707 0 1,707 0 2,047 0 2,047 1,625 2,047 0
HEALTH & HYGIENE MATERIALS 140 0 140 0 140 0 140 72 140 0
REMOVAL & STORAGE COSTS 0 0 0 0 2 (2) 0 2 2 (2)
OTHER PROPERTY COSTS 1,883 0 1,005 878 963 920 1,883 7 1,012 871
PROPERTY COSTS 3,875 (20) 3,015 858 3,315 898 4,213 1,862 3,378 835
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 4,660 (28) 5,260 (105) 5,294 (139) 5,155 5,497 5,315 (160)
COMPUTER EQUIPMENT MAINTENANCE 2,105 (64) 2,155 (14) 2,157 (16) 2,141 2,154 2,155 (14)
I.T. EQUIPMENT MAINT - CONTRACT 675 (13) 722 (59) 713 (50) 663 585 715 (52)
I.T. ELECTRONIC MESSAGING 33 3 4 32 4 32 36 0 4 32
EQUIPMENT, APPARATUS AND TOOLS 151 0 134 17 134 17 151 89 134 17
SUPPLIES FOR CLIENTS 79 0 79 0 79 0 79 69 79 0
FURNITURE - OFFICE 1 0 4 (3) 4 (3) 1 5 6 (5)
FURNITURE - GENERAL 0 0 0 0 0 0 0 3 0 0
MATERIALS 112 0 73 39 73 39 112 58 73 39
MATERIALS, APPARATUS AND EQUIPMENT 2 0 3 (1) 4 (2) 2 1 3 (1)
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 2 0 2 0 2 0 1 1
PROVISIONS - GENERAL 20 0 20 0 20 0 20 5 20 0
FOOD PURCHASES WITHIN CONTRACT 1 0 1 0 1 0 1 0 1 0
BEVERAGES 2 0 2 0 2 0 2 1 2 0
PROTECTIVE CLOTHING & UNIFORMS 0 2 1 1 2 0 2 1 2 0
OTHER SUPPLIES AND SERVICES 253 0 450 8 498 (4) 494 513 507 (13)
HEALTH AND SAFETY 0 0 58 0 58 0 58 43 58 0
CATERING - OUTWITH CONTRACT 6 0 0 6 0 6 6 0 0 6
OUTSOURCED MAIL 213 (39) 215 (41) 215 (41) 174 141 215 (41)
SUPPLIES AND SERVICES 8,315 (139) 9,183 (120) 9,260 (161) 9,099 9,165 9,290 (191)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 0 0 0 0 0 1 0 0
POOL CAR CHARGES - RENTAL 14 1 5 10 5 10 15 3 6 9
POOL CAR CHARGES - FUEL 3 0 0 3 0 3 3 0 1 2
FLEET SERVICE CHARGES 15 0 15 0 15 0 15 15 15 0
EXTERNAL TRANSPORT CONTRACT 0 0 1 (1) 0 0 0 0 0 0
TRANSPORT AND PLANT 32 1 21 12 20 13 33 19 22 11
ADMINISTRATION
PRINTING AND STATIONERY 544 (17) 538 (10) 541 (13) 528 418 545 (17)
TELEPHONES 1,554 (3) 1,550 1 1,564 (13) 1,551 1,273 1,566 (15)
MOBILE PHONES 173 1 170 4 170 4 174 106 177 (3)
ADVERTISING - RECRUITMENT 29 0 54 (25) 50 (21) 29 42 46 (17)
ADVERTISING - OTHER 125 (1) 127 (3) 129 (5) 124 82 129 (5)
POSTAGES/COURIERS 1,062 (154) 1,078 (170) 1,080 (172) 908 823 1,085 (177)
SMS MESSAGING 5 0 7 (2) 7 (2) 5 4 7 (2)
MEMBERSHIP FEES/SUBSCRIPTIONS 250 (19) 266 3 266 3 269 282 267 2
INSURANCE 141 0 141 0 141 0 141 141 140 1
MEDICAL COSTS 348 2 305 45 315 35 350 292 320 30
LEGAL EXPENSES 187 (20) 168 (1) 162 5 167 137 163 4
HOSPITALITY / CIVIC RECOGNITION 31 0 31 0 26 5 31 17 26 5
PAYPOINT AGENCY FEES 70 0 75 (5) 75 (5) 70 60 75 (5)
SECURITY UPLIFT FEES 2 0 2 0 2 0 2 1 2 0
OTHER ADMIN COSTS 576 0 633 (1) 633 (1) 632 724 636 (4)
MEMBERS ALLOWANCES 2,271 64 2,269 66 2,269 66 2,335 1,997 2,272 63
CONFERENCES - MEMBERS (incl associated costs) 11 0 11 0 11 0 11 5 8 3
CONFERENCES - OFFICIALS (incl associated costs) 5 0 1 4 1 4 5 1 1 4
TRAINING 808 (47) 828 (67) 825 (64) 761 545 822 (61)
VOLUNTEERS' EXPENSES 8 0 16 0 16 0 16 14 16 0
INTERNAL SUPPORT SERVICES ALLOCATION 68 0 68 0 68 0 68 0 68 0
ADMINISTRATION 8,268 (194) 8,338 (161) 8,351 (174) 8,177 6,964 8,371 (194)
79

Page 80

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Finance & Corporate Resources - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
PAYMENT TO OTHER BODIES
OTHER LOCAL AUTHORITIES 4 0 0 4 4 0 4 0 0 4
GRANTS TO VOLUNTARY ORGANISATIONS 408 0 483 0 485 0 485 492 485 0
PAYMENTS TO OTHER BODIES 2,347 (4) 2,448 (66) 2,439 (56) 2,383 2,100 2,436 (53)
EXTERNAL AUDIT FEES 665 0 665 0 665 0 665 325 665 0
PRIVATE INDIVIDUALS - GENERAL 10 (10) 0 0 0 0 0 2 0 0
PAYMENT TO OTHER BODIES 3,434 (14) 3,596 (62) 3,593 (56) 3,537 2,919 3,586 (49)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 0 0 1 (1) 1 (1) 0 28 1 (1)
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 274 (18) 297 (6) 292 (1) 291 296 292 (1)
PAYMENT TO CONTRACTORS 274 (18) 298 (7) 293 (2) 291 324 293 (2)
TRANSFER PAYMENTS
RENT ALLOWANCE 23,581 0 17,130 451 17,130 451 18,319 16,150 17,879 440
RENT REBATES 42,344 0 31,429 53 31,429 53 31,203 24,360 31,149 54
TRANSFER PAYMENTS 65,925 0 48,559 504 48,559 504 49,522 40,510 49,028 494
FINANCING CHARGES
LEASING CHARGES - FINANCE 0 0 1 (1) 1 (1) 0 (1) 4 (4)
I.T. EQUIPMENT LEASING-CONTRACT 1,485 (69) 1,510 (94) 1,513 (97) 1,416 1,323 1,550 (134)
FINANCING CHARGES 1,485 (69) 1,511 (95) 1,514 (98) 1,416 1,322 1,554 (138)
TOTAL EXPENDITURE 127,165 (756) 110,232 893 110,545 957 111,961 94,425 111,110 851
INCOME
STATUTORY ADDITIONS - COST OF COLLECTION (1,127) 262 (1,028) 163 (979) 114 (865) 0 (979) 114
RENT REBATES SUBSIDY (37,191) 0 (26,260) 69 (26,260) 69 (25,912) (22,374) (25,981) 69
RENT ALLOWANCE SUBSIDY (23,067) 0 (16,804) (263) (16,804) (263) (17,805) (16,724) (17,539) (266)
DWP SUBSIDY (1,170) 0 (1,165) (5) (1,165) (5) (1,170) (1,075) (1,165) (5)
CONTRIBUTIONS FROM DEVELOPMENT AGENCIES (150) 0 (150) 0 (150) 0 (150) (126) (150) 0
CONTRIBUTIONS FROM OTHER BODIES (335) 2 (252) (81) (261) (72) (333) (231) (270) (63)
SALES - DEPARTMENTS OF THE AUTHORITY (20) 0 0 (20) 0 (20) (20) 0 0 (20)
FEES AND CHARGES - GENERAL (5,096) 505 (5,061) 434 (5,071) 444 (4,627) (2,828) (5,056) 429
CHARGES TO HEALTH BOARDS (45) 0 (45) 0 (45) 0 (45) 0 (45) 0
FEES AND CHARGES - OTHER BODIES (221) 0 (221) 0 (221) 0 (221) (188) (221) 0
FEES AND CHARGES - DEPARTMENTS OF THE AUTHORITY (2,488) 0 (2,560) 72 (2,556) 68 (2,488) (2,003) (2,556) 68
HOME LOANS REPAYMENTS (5) 0 (5) 0 (5) 0 (5) (20) (5) 0
BIRTH REGISTRATION (16) 0 (14) (2) (14) (2) (16) (14) (14) (2)
DEATH REGISTRATION (63) (1) (60) (4) (60) (4) (64) (54) (60) (4)
MARRIAGE STATUTORY FEES (110) 2 (99) (9) (99) (9) (108) (103) (106) (2)
EXTRACT ISSUE (83) 0 (83) 0 (83) 0 (83) (82) (91) 8
MARRIAGES (63) 11 (61) 9 (61) 9 (52) (46) (57) 5
CITIZENSHIP CEREMONIES (20) 2 (20) 2 (20) 2 (18) (16) (17) (1)
CIVIL PARTNERSHIPS 0 (1) 0 (1) 0 (1) (1) 0 0 (1)
OTHER INCOME (6,866) (26) (6,520) (380) (6,436) (409) (6,845) (3,501) (6,543) (302)
REALLOCATION OF CENTRAL SUPPORT COSTS (6,668) 0 (6,668) 0 (6,668) 0 (6,668) 0 (6,668) 0
REALLOCATION OF SUPPORT COSTS (9) 0 (9) 0 (9) 0 (9) 0 (9) 0
INCOME (84,813) 756 (67,085) (16) (66,967) (79) (67,505) (49,385) (67,532) 27
NET EXPENDITURE 42,352 0 43,147 877 43,578 878 44,456 45,040 43,578 878
80

Page 81

Appendix D
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 20 February 2026 (No.12)
Housing and Technical Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Housing Services 8.289 8.055 0.234 2.82% 8.382
Property Services 10.652 10.763 (0.111) (1.04%) 10.365
Total Housing and Technical Resources 18.941 18.818 0.123 0.65% 18.747
6
81

Page 82

Housing and Technical Resources (excl HRA) Variance Analysis 2025/26 (Period 12) 
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 1,164k
under
APT&C Basic / Overtime /
Superannuation / National
Insurance – 1,733k under
Property Services –
1,774k under 
The variance relates to vacancies which
are actively being recruited in line with
Service requirements.  
Manual Workers – (532k) over  Property Services –
(532k) over 
The variance relates to the current level
of trade operatives and overtime required
to meet service demands. 
Property Costs (1,471k)
over
Rates – (124k) over  Property Services –
(122k) over 
The variance relates to greater than
budgeted rates charges for Council
properties mainly within the Estates
Service. 
Scottish Water – Metered
Charges – (104k) over 
Property Services –
(99k) over 
The overspend related to increase water
charges within the Office Accommodation
and Estates services. 
Service Charge – (229k) over Property Services –
(198k) over
The overspend relates to the cost of
shopping centre service charges which
are not recoverable from tenants. 
Bed & Breakfast – (337k) over Housing Services –
(337k) over 
The variance relates to greater than
budgeted demand for bed & breakfast
within the Homelessness service.  
Security Costs – (70k) over  Property Services –
(70k) over 
This variance relates to greater
expenditure on CCTV security costs than
is currently budgeted, due to CCTV
infrastructure project delay. 
82

Page 83

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Repairs & Maintenance/ Life
Cycle Maintenance – (765k) over 
Housing Services –
(210k) over 
The overspend relates to additional
expenditure on the maintenance of
homelessness property. 
Property Services –
(555k) over 
The overspend relates to additional
expenditure on the maintenance of the
corporate estate. 
Housing Rent Unlet Period – 85k
under
Property Services –
32k under
The underspend is due to lower than
expected unlet properties within the
Estates service.   
Housing Services –
53k under
The underspend is due to lower than
expected unlet properties within the
Homelessness  service  
Gas – 83k under  Property Services –
83k under
The underspend relates to lower than
anticipated gas charges for corporate
buildings.  
Other Property Costs – 118k
under
Housing Services –
130k under
The underspend relates to funding
received for Ukraine Resettlement and
will be transferred to reserves at the end
of the financial year. 
Supplies &
Services
(33k) over Computer Equipment Purchase –
(78k) over
Property Services –
(74k) over
The overspend is due to greater than
anticipated IT expenditure within
Consultancy Services. 
Materials/Stock/Store Issues –
44k under
Property Services –
44k under
Expenditure on materials varies
depending on the current workload
demands and timing of works on a wide
variety of capital and revenue works.
83

Page 84

Subjective Head Variance  Subjective line Service / amount Explanation
Transport & Plant (392k) over Purchase Of Plant & Equipment
– (135k) over 
Property Services –
(135k) over 
The overspend relates to the
replacement of tools within Building
Services. 
Fleet Service Charges – (183k)
over
Property Services –
(223k) over
The overspend relates to greater than
budgeted fleet service charges on
leasing, fuel and vehicle maintenance
within Building Services.  
Hire of External
Plant/Scaffolding/Skips – (69k)
over 
Property Services –
(69k) over
Expenditure on hires varies depending on
the workload demands and timing of
works on a wide variety of capital and
revenue works. 
Payment to
Other Bodies 
1k under  Other Committees of the
Authority – (108k) over
Property Services –
(109k) over
The overspend relates to greater than
budgeted recovery of internal support
costs within Building Services. 
Assistance to Home Owners –
40k under 
Property Services –
40k under
This variance reflects the timing of spend
on grants to owners to date.
Payment to
Contractors 
(1,510k)
over
Payment to Private Contractors –
689k under
Property Services –
511k under
The underspend relates to the lower than
anticipated payments to sub contractors
for work within Building Services. 
Housing Services –
178k under 
The underspend relates to commissioned
services in the Homelessness budget
where expenditure varies according to
service requirements. 
84

Page 85

Subjective Head Variance  Subjective line Service / amount Explanation
Payments to
Contractors
(cont.) 
Payment to External Consultant
– (2,199k) over 
Property Services –
(2,199k) over 
This overspend is mainly due to the
nature of some major projects requiring
increased use of specialist consultants
and is partially offset by an underspend in
employee costs. 
Income  2,418k over
recovered 
Fees & Charges – 99k over
recovered
Property Services –
(154k) under
recovered 
The under recovery is due to service
charges for rental properties within
Estates being less than anticipated. 
Housing Services –
253k over recovered 
The over recovery in income is mainly
due to increased demand for the use of
bed and breakfast during 25/26. 
Rental Income – (380k) under
recovered 
Property Services –
(380k) under
recovered 
Income is under recovered due to lower
than budgeted rental income within Office
Accommodation. 
House Rents – 283k over
recovered
Housing Services –
283k over recovered
The over recovery relates to more house
rent income than budgeted within the
Homelessness service.     
Recovery from
Capital/Recharges – 2,410k over
recovered 
Property Services –
2,410k over
recovered 
The level of income recovered varies
depending on the current workload, the
timing of a wide variety of projects and is
offset by a reduction in expenditure. 
85

Page 86

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT & C BASIC 16,923 815 16,633 1,038 16,652 1,362 18,012 14,573 16,686 1,326
APT & C OVERTIME 69 127 96 99 118 77 195 140 163 32
APT & C SUPERANNUATION 1,095 80 1,075 90 1,076 120 1,196 919 1,028 168
APT & C NIC 2,172 149 2,140 169 2,148 178 2,326 1,867 2,119 207
MANUAL BASIC 21,312 311 21,089 534 20,792 269 21,061 18,256 20,819 242
MANUAL OVERTIME 538 (200) 695 (357) 832 (494) 338 1,040 1,194 (856)
MANUAL SUPERANNUATION 1,371 31 1,353 49 1,333 33 1,366 1,181 1,325 41
MANUAL NIC 2,777 104 2,740 141 2,725 16 2,741 2,405 2,700 41
TRAVEL AND SUBSISTANCE 13 12 13 10 14 9 23 5 25 (2)
OTHER EMPLOYEE COSTS (22) 0 (18) (4) (20) (2) (22) (32) (38) 16
PENSION INCREASES 608 7 617 (2) 625 (10) 615 610 666 (51)
APPRENTICESHIP LEVY 3 0 3 (3) 0 0 0 0 0 0
EMPLOYEE COSTS 46,859 1,436 46,436 1,764 46,295 1,558 47,851 40,964 46,687 1,164
PROPERTY COSTS
RATES 2,252 (5) 2,375 (122) 2,375 (122) 2,253 2,096 2,377 (124)
SCOTTISH WATER - UNMETERED CHARGES 8 4 10 (2) 10 (2) 8 1 10 (2)
SCOTTISH WATER - METERED CHARGES 310 (78) 333 (97) 331 (95) 236 248 340 (104)
RENT 1,865 0 1,871 (11) 1,872 (11) 1,861 1,636 1,902 (41)
SERVICE CHARGE 420 0 653 (233) 653 (233) 420 532 649 (229)
FACTORING CHARGES 5 0 0 5 0 5 5 0 0 5
OTHER ACCOMMODATION COSTS 3,539 (192) 3,495 2 3,500 (3) 3,497 3,424 3,452 45
BED AND BREAKFAST 316 (289) 381 (354) 381 (354) 27 271 364 (337)
PROPERTY INSURANCE 449 (19) 443 (13) 443 (13) 390 455 441 (51)
SECURITY COSTS 337 (77) 343 (83) 336 (76) 260 150 330 (70)
GROUND MAINTENANCE 52 0 52 0 52 0 52 53 53 (1)
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 0 5 5 5 5 10 2 5 5
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 3,427 0 3,372 (56) 3,481 (169) 3,316 2,316 3,467 (151)
LIFE CYCLE MAINTENANCE 5,068 (14) 5,037 17 4,698 356 5,054 4,804 4,699 355
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 374 (25) 964 (615) 1,195 (846) 351 1,108 1,320 (969)
ADAPTIONS - INTERNAL CONTRACTORS 0 0 0 0 0 0 0 73 0 0
HOUSING - RENT W/O UNLET PERIODS 746 65 594 265 594 265 919 710 834 85
HOUSING - RENT W/O BAD PERIODS 816 (48) 771 (3) 771 (3) 768 459 771 (3)
ASBESTOS 0 0 0 0 0 0 0 36 0 0
WATER QUALITY 0 0 0 0 0 0 0 1 0 0
FIXED ELECTRICAL 0 0 25 (25) 25 (25) 0 26 0 0
EPC 0 0 0 0 0 0 0 10 0 0
ELECTRICITY  - CONTRACT 1,524 28 1,462 60 1,465 60 1,517 1,298 1,520 (3)
ELECTRICITY  - NON CONTRACT 27 0 29 (2) 29 (2) 27 21 29 (2)
GAS 503 12 495 19 495 19 514 345 431 83
HEATING OIL 12 0 11 1 12 0 12 10 11 1
FIXTURE & FITTINGS 878 (32) 859 (20) 831 (25) 810 888 835 (25)
JANITOR SERVICE 152 0 152 0 152 0 152 152 152 0
CLEANING CONTRACT 397 4 416 (15) 416 (15) 401 401 416 (15)
CLEANING OUTWITH CONTRACT 0 0 0 0 0 0 0 9 0 0
CLEANING MATERIALS 10 0 3 7 3 7 10 3 4 6
HEALTH & HYGIENE MATERIALS 0 0 1 (1) 1 (1) 0 0 1 (1)
WINDOW CLEANING 2 0 2 0 2 0 2 1 2 0
PEST CONTROL 6 0 1 5 1 5 6 0 1 5
REFUSE UPLIFT 392 3 399 (4) 399 (4) 395 24 399 (4)
REMOVAL & STORAGE COSTS 42 0 24 24 32 20 57 37 39 18
OTHER PROPERTY COSTS 746 (101) 619 126 616 129 745 604 627 118
OFFICE ACCOM-FACILITIES MANAGEMENT 1,089 (53) 1,092 (45) 1,089 (44) 1,044 1,089 1,089 (45)
ACCOMMODATION RECHARGE TO USERS 53 (20) 53 (20) 53 (20) 33 34 53 (20)
PROPERTY COSTS 25,827 (837) 26,342 (1,185) 26,318 (1,192) 25,152 23,327 26,623 (1,471)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 521 15 519 1 594 (74) 520 448 598 (78)
COMPUTER EQUIPMENT MAINTENANCE 6 0 0 6 0 6 6 0 0 6
I.T. EQUIPMENT MAINT-CONTRACT 212 (3) 217 (10) 213 (6) 207 16 217 (10)
EQUIPMENT, APPARATUS AND TOOLS 45 0 45 0 45 0 45 2 45 0
ADAPTATIONS FOR CLIENTS 500 0 503 (3) 503 (3) 500 158 503 (3)
FURNITURE - OFFICE 1 (1) 3 (3) 2 (2) 0 3 0 0
FURNISHINGS 0 0 0 0 0 0 0 110 0 0
MATERIALS 10,469 1,379 9,848 0 10,769 44 9,813 4,672 8,813 1,000
STOCK/STORE ISSUES 0 0 994 (994) 0 0 0 3,596 956 (956)
MATERIALS, APPARATUS AND EQUIPMENT 0 0 0 0 0 0 0 436 0 0
AUDIO VISUAL 10 0 10 0 10 0 10 1 10 0
PUBLICATIONS, JOURNALS, NEWSPAPERS ETC. 2 0 0 0 0 0 0 0 0 0
TV LICENCES - EDUCATION 1 0 1 0 1 1 1 3 1 0
FOODSTUFFS - GENERAL 1 0 0 0 0 0 0 0 0 0
FOOD PURCHASES WITHIN CONTRACT 0 0 0 0 0 0 0 13 1 (1)
BEVERAGES 0 2 1 (1) 0 0 0 1 0 0
PROTECTIVE CLOTHING & UNIFORMS 44 0 42 2 44 0 44 33 44 0
OTHER SUPPLIES AND SERVICES 87 1 58 18 63 15 78 34 67 11
HEALTH AND SAFETY 1 0 0 1 0 1 1 1 1 0
CATERING - CONTRACT 1 0 0 0 0 0 0 0 0 0
OUTSOURCED MAIL 2 (2) 2 (2) 2 (2) 0 19 2 (2)
DELIVERY CHARGE 0 0 0 0 0 0 0 1 0 0
BULK BUYING DISCOUNT 0 0 0 0 0 0 0 (5) 0 0
SUPPLIES AND SERVICES 11,903 1,391 12,243 (985) 12,246 (20) 11,225 9,542 11,258 (33)
86

Page 87

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Housing & Technical Resources Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 0 0 0 0 0 0 0 4 0 0
PURCHASE OF PLANT 125 0 293 (168) 260 (135) 125 177 260 (135)
FLEET SERVICES - FUEL 0 3 4 (1) 3 0 3 26 4 (1)
POOL CAR RECHARGE - RENTAL CHARGE 43 10 58 (4) 57 (3) 54 30 55 (1)
POOL CAR RECHARGE - FUEL 9 9 7 11 7 11 18 0 7 11
POOL CAR RECHARGE - ADDITIONAL CHARGES 0 1 0 1 0 1 1 0 0 1
OTHER TRANSPORT COSTS 1 (1) 3 (3) 2 (2) 0 10 3 (3)
TRANSPORT INSURANCE 44 0 43 1 43 1 44 44 43 1
LICENCES 0 0 0 0 0 0 0 1 0 0
PLANT SERVICES 7 0 7 0 16 (9) 7 12 16 (9)
FLEET SERVICE CHARGES 2,820 138 3,151 (183) 3,167 (191) 2,976 2,662 3,159 (183)
HIRE OF EXTERNAL PLANT 240 17 230 27 246 11 257 93 246 11
HIRE OF SCAFOLDING 1,033 44 1,156 (79) 1,156 (79) 1,077 698 1,156 (79)
HIRE OF SKIPS 12 21 34 (1) 34 (1) 33 433 34 (1)
EXTERNAL TRANSPORT CONTRACT 0 0 7 1 11 (3) 8 9 11 (3)
TAXI CHARGES - CONTRACTED 11 1 5 0 5 0 5 5 6 (1)
TRANSPORT AND PLANT 4,345 243 4,998 (398) 5,007 (399) 4,608 4,204 5,000 (392)
ADMINISTRATION
PRINTING AND STATIONERY 79 (3) 84 (7) 86 (8) 78 71 83 (5)
TELEPHONES 103 (1) 97 4 94 7 101 37 96 5
MOBILE PHONES 39 0 43 (3) 42 (2) 40 113 44 (4)
ADVERTISING - OF COUNCIL SERVICE AVAILABILITY 0 7 0 0 0 0 0 0 0 0
ADVERTISING - OTHER 6 0 1 5 1 5 6 1 1 5
POSTAGES/COURIERS 26 (12) 23 (11) 24 (12) 12 34 22 (10)
MEMBERSHIP FEES/SUBSCRIPTIONS 15 (3) 16 (1) 16 (1) 15 20 32 (17)
INSURANCE 216 0 230 (14) 231 (15) 216 210 228 (12)
MEDICAL COSTS 16 1 16 0 17 (1) 16 37 17 (1)
LEGAL EXPENSES 14 2 24 (5) 27 (5) 22 25 26 (4)
PETTY OUTLAYS 12 0 14 (2) 14 (2) 12 13 24 (12)
HOSPITALITY / CIVIC RECOGNITION 2 0 3 0 4 (1) 3 1 1 2
PAYPOINT AGENCY FEES 0 0 0 0 0 0 0 4 0 0
OTHER ADMIN COSTS 8 0 7 1 7 1 8 1 3 5
TRAINING 2 (2) 1 (1) 2 (2) 0 31 2 (2)
INTERNAL SUPPORT SERVICES ALLOCATION 457 0 511 (54) 457 0 457 298 457 0
CENTRAL ADMINISTRATION 2,749 0 2,803 (54) 2,749 0 2,749 2,355 2,749 0
ADMINISTRATION 3,744 (11) 3,873 (142) 3,771 (36) 3,735 3,251 3,785 (50)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 2,122 (109) 2,814 (351) 2,373 90 2,465 2,243 2,573 (108)
OTHER LOCAL AUTHORITIES 0 0 0 0 0 0 0 12 2 (2)
PAYMENTS TO VOLUNTARY ORGANISATIONS 0 0 1 (1) 1 (1) 0 0 0 0
PAYMENTS TO OTHER BODIES 1,663 (7) 1,727 16 1,730 12 1,751 1,637 1,680 71
SUPPORTING PEOPLE INTERNAL PROVIDER 1,129 0 1,129 0 1,129 0 1,132 1,043 1,132 0
SUPPORTING PEOPLE EXTERNAL PROVIDER 419 0 419 0 419 0 419 297 419 0
HOUSING ADMINISTRATION 885 0 885 0 885 0 885 817 885 0
ASSISTANCE TO HOME OWNERS 1,340 (249) 1,650 (72) 1,650 (72) 1,578 930 1,538 40
PRIVATE INDIVIDUALS - GENERAL 151 0 251 (100) 251 (100) 151 228 151 0
PAYMENT TO OTHER BODIES 7,709 (365) 8,876 (508) 8,438 (71) 8,381 7,207 8,380 1
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY CONTRACTOR 0 0 0 0 0 0 0 477 0 0
PAYMENT TO PRIVATE CONTRACTOR 16,930 (1,640) 16,440 776 16,482 (224) 17,500 14,314 16,811 689
PAYMENT TO EXTERNAL CONSULTANTS 2,113 (1,807) 1,856 (1,550) 2,505 (2,199) 306 2,177 2,505 (2,199)
PAYMENT TO CONTRACTORS 19,043 (3,447) 18,296 (774) 18,987 (2,423) 17,806 16,968 19,316 (1,510)
TRUST FUND EXPENDITURE
TRANSFER PAYMENTS
FINANCING CHARGES
I.T. EQUIPMENT LEASING-CONTRACT 161 (8) 157 (3) 155 (1) 154 693 158 (4)
INTEREST ON REVENUE BALANCES 2 0 2 0 2 0 2 0 2 0
FINANCING CHARGES 163 (8) 159 (3) 157 (1) 156 693 160 (4)
TOTAL EXPENDITURE 119,593 (1,598) 121,223 (2,231) 121,219 (2,584) 118,914 106,156 121,209 (2,295)
INCOME
CONTRIBUTIONS FROM OTHER BODIES (2,358) 0 (3,270) 268 (2,947) (104) (3,529) (3,025) (3,578) 49
SALES - DEPARTMENTS OF THE AUTHORITY (460) 0 (453) (7) (453) (7) (460) 0 (453) (7)
FEES AND CHARGES - GENERAL (815) 269 (588) 42 (588) 42 (546) (476) (643) 97
FEES AND CHARGES - DEPARTMENTS OF THE A (46) 0 (48) 2 (48) 2 (46) 0 (48) 2
RENTAL INCOME (3,875) (222) (3,646) (563) (3,637) (572) (4,209) (3,164) (3,829) (380)
HOUSE RENTS (6,984) (4) (7,816) 328 (7,816) 328 (7,288) (6,572) (7,571) 283
INSURANCE RECOVERIES (26) 26 0 0 0 0 0 0 0 0
OTHER INCOME (2,749) 2 (2,709) (38) (2,713) (36) (2,749) (2,208) (2,713) (36)
REALLOCATION OF CENTRAL SUPPORT COSTS (876) 0 (876) 0 (876) 0 (876) (584) (876) 0
REALLOCATION OF SUPPORT COSTS (1,556) (74) (1,737) 107 (1,747) 117 (1,630) (884) (1,737) 107
RECOVERY FROM CAPITAL (27,118) (2,617) (26,521) (3,214) (27,182) 745 (28,350) (22,350) (30,173) 1,823
RECHARGES - DEPARTMENTS OF AUTHORITY (53,498) 4,218 (54,709) 5,429 (54,405) 2,203 (50,290) (42,609) (50,770) 480
MANUAL RECHARGES - DEPARTMENTS OF AUTHORITY 0 0 0 0 0 0 0 (5,537) 0 0
INCOME (100,361) 1,598 (102,373) 2,354 (102,412) 2,718 (99,973) (87,409) (102,391) 2,418
NET EXPENDITURE 19,232 0 18,850 123 18,807 134 18,941 18,747 18,818 123
87

Page 88

88

Page 89

Appendix E
Housing and Technical Resources (HRA) Variance Analysis 2025/26 (Period 12)   
Subjective Head Variance  Subjective line Service / amount Explanation
Employee Costs 78k under  APT&C Basic/Overtime/
Superannuation/National
Insurance/Travel/Pensions – 78k
under
HRA The underspend is mainly due to
vacancies across the service. 
Property Costs 469k under  Grounds Maintenance – 68k  
under 
HRA  The forecast underspend is due to lower
than anticipated charges. 
Housing – Rent Write off Unlet
Periods/Bad Periods – 473k
under 
HRA The net underspend reflects a lower than
anticipated level of bad debt provision.
During the year, collection rates for rental
income have been better than forecast,
which is due in part to schemes such as
the tenancy sustainment fund mitigating
the overall level of debt. 
Electricity – contract/non
contract/ Gas/Heating Oil/Solid
Fuel – 125k under 
HRA The forecast underspend is due to
lower than budgeted utility
expenditure on communal areas
within HRA. 
Fixtures and Fittings – (76k) over  HRA This budget is demand led and the
overspend reflects the increased demand
during the year. 
Cleaning Contract – (109k) over  HRA The overspend is due to greater than
budgeted charges for Facilities
Management cleaning charges within the
overall HRA service. 
6
89

Page 90

Subjective Head Variance  Subjective line Service / amount Explanation
Property Costs
(cont.) 
Pest Control – (60k) over  HRA The overspend is due to increased
demand for pest control services within
the overall HRA service. 
Payment to
Other Bodies 
(398k) over  Payment to Other Bodies –
(423k) over
HRA This includes payments in relation to new
systems for which we are expecting a
transfer of budget from reserves. 
Income (54k) under 
recovered 
Fees and Charges – General –
(138k) under recovered
HRA The under recovery reflects lower than
anticipated income from laundry charges.  
House/Lock Up Rents – 111k
over recovered
HRA The over recovery is due to the timing of
new builds which were completed ahead
of the anticipated profiles. 
Year End Transfer from the
Balance Sheet – 41k over
recovered 
HRA The budget assumes a level of transfer
from reserves, due to the current net
overspend across the service. 
90

Page 91

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Housing and Revenue Account Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT & C BASIC 12,608 69 12,671 (80) 12,725 (134) 12,591 11,015 12,672 (81)
APT & C OVERTIME 22 47 29 40 29 40 69 40 56 13
APT & C SUPERANNUATION 818 4 818 2 818 2 820 712 814 6
APT & C NIC 1,550 79 1,556 70 1,556 70 1,626 1,341 1,504 122
TRAVEL AND SUBSISTANCE 2 33 2 33 2 33 35 3 3 32
PENSION INCREASES 219 0 219 0 165 54 219 213 233 (14)
EMPLOYEE COSTS 15,219 232 15,295 65 15,295 65 15,360 13,324 15,282 78
PROPERTY COSTS
RATES 79 (7) 78 (6) 78 (6) 72 78 78 (6)
SCOTTISH WATER - UNMETERED CHARGES 4 0 0 4 0 4 4 0 0 4
SCOTTISH WATER - METERED CHARGES 8 0 17 (9) 17 (9) 8 8 17 (9)
RENT 6 0 0 6 0 6 6 0 0 6
SERVICE CHARGE 94 0 118 (24) 118 (24) 94 2 118 (24)
FACTORING CHARGES 0 0 4 (4) 4 (4) 0 4 4 (4)
OTHER ACCOMMODATION COSTS 11 0 0 1 0 1 1 23 1 0
PROPERTY INSURANCE 2,268 0 3,497 0 3,497 0 3,497 3,465 3,497 0
SECURITY COSTS 55 0 5 50 5 50 55 4 5 50
GROUND MAINTENANCE 4,411 54 4,180 83 4,188 75 4,263 4,067 4,180 83
GROUNDS MAINTENANCE ADDITIONAL WORKS 10 (10) 10 (10) 10 (10) 0 12 15 (15)
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 43,631 (102) 46,333 194 46,333 194 46,527 29,273 46,333 194
LIFE CYCLE MAINTENANCE 166 (166) 194 (194) 194 (194) 0 198 194 (194)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 609 268 941 (40) 941 (40) 901 1,155 941 (40)
HOUSING - RENT FREE ACCOMMODATION 247 19 210 56 210 56 266 116 210 56
GAS MAINTENANCE COSTS 0 0 0 0 0 0 0 2 0 0
ELECTRICAL HEATING MAINTENANCE 0 0 0 0 0 0 0 3 0 0
HOUSING - RENT W/O UNLET PERIODS 2,950 0 2,708 229 2,708 229 2,937 2,274 2,464 473
HOUSING - RENT W/O BAD PERIODS 2,273 0 1,250 0 1,250 0 1,250 1,032 1,250 0
ASBESTOS 139 0 143 0 143 0 143 98 143 0
FIXED ELECTRICAL 1 (1) 3 (3) 3 (3) 0 3 4 (4)
EPC (1) 1 1 (1) 1 (1) 0 (1) 1 (1)
ELECTRICITY  - CONTRACT 1,350 0 1,324 26 1,324 26 1,350 691 1,172 178
ELECTRICITY  - NON CONTRACT 0 0 18 (18) 18 (18) 0 13 14 (14)
GAS 438 0 420 18 420 18 438 443 494 (56)
HEATING OIL 54 0 14 40 14 40 54 31 34 20
SOLID FUEL 4 0 6 (2) 6 (2) 4 7 7 (3)
FIXTURE & FITTINGS 0 0 119 (66) 119 (66) 53 113 129 (76)
JANITOR SERVICE 0 0 30 13 30 13 43 30 30 13
CLEANING CONTRACT 491 (106) 492 (107) 492 (107) 385 494 494 (109)
CLEANING MATERIALS 57 0 21 36 21 5 57 22 26 31
HEALTH & HYGIENE MATERIALS 1 (1) 1 (1) 0 0 0 1 0 0
WINDOW CLEANING 16 0 19 (3) 19 (3) 16 37 20 (4)
PEST CONTROL 176 (54) 192 (70) 192 (70) 122 168 182 (60)
REFUSE UPLIFT 15 (15) 24 (24) 24 (24) 0 29 20 (20)
REMOVAL & STORAGE COSTS 14 0 23 (9) 23 (9) 14 23 25 (11)
OTHER PROPERTY COSTS 32 0 18 14 18 14 32 19 21 11
PROPERTY COSTS 59,609 (120) 62,413 179 62,420 141 62,592 43,937 62,123 469
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 295 0 281 14 281 14 295 36 149 146
COMPUTER EQUIPMENT RENTAL 0 0 11 (11) 11 (11) 0 1 22 (22)
I.T. EQUIPMENT MAINT-CONTRACT 74 0 116 (42) 116 (42) 74 1 250 (176)
EQUIPMENT, APPARATUS AND TOOLS 22 (9) 38 (25) 38 (25) 13 27 30 (17)
ADAPTATIONS FOR CLIENTS 1,890 0 0 0 0 0 0 0 0 0
FURNITURE - OFFICE 10 0 5 5 5 5 10 3 3 7
MATERIALS 0 0 32 (32) 32 (32) 0 0 0 0
MATERIALS, APPARATUS AND EQUIPMENT 1 (1) 2 (2) 2 (2) 0 2 2 (2)
PROVISIONS 2 0 4 (2) 4 (2) 2 5 5 (3)
FOOD PURCHASES 0 0 1 (1) 1 (1) 0 0 0 0
BEVERAGES 4 0 4 0 4 0 4 0 4 0
PROTECTIVE CLOTHING & UNIFORMS 12 0 10 2 10 2 12 9 9 3
LAUNDRY COSTS 33 (17) 28 (12) 28 (12) 16 41 45 (29)
OTHER SUPPLIES AND SERVICES 38 0 10 28 10 28 38 9 10 28
HEALTH AND SAFETY 15 0 0 15 0 15 15 0 0 15
CATERING - CONTRACT 1 (1) 1 (1) 1 (1) 0 1 1 (1)
CATERING - OUTWITH CONTRACT 1 (1) 1 (1) 1 (1) 0 1 1 (1)
OUTSOURCED MAIL 4 (4) 7 (7) 7 (7) 0 6 6 (6)
SUPPLIES AND SERVICES 2,402 (33) 551 (72) 551 (72) 479 142 537 (58)
TRANSPORT AND PLANT
PURCHASE OF VEHICLES 1 (1) 3 (3) 3 (3) 0 3 3 (3)
FLEET SERVICES - FUEL 0 0 4 (4) 4 (4) 0 1 14 (14)
POOL CAR RECHARGE - RENTAL CHARGE 26 0 4 22 4 22 26 5 5 21
POOL CAR RECHARGE - FUEL 6 0 0 6 0 6 6 0 6 0
POOL CAR RECHARGE - ADDITIONAL CHARGES 1 0 0 1 0 1 1 0 1 0
OTHER TRANSPORT COSTS 1 (1) 10 (10) 10 (10) 0 9 10 (10)
FLEET SERVICE CHARGES 158 0 191 (33) 191 (33) 158 124 191 (33)
HIRE OF SKIPS 0 0 0 0 0 0 0 4 4 (4)
STORAGE 4 0 1 3 1 3 4 0 0 4
TAXI CHARGES - CONTRACTED 0 0 0 0 0 0 0 0 0 0
TRANSPORT AND PLANT 197 (2) 213 (18) 213 (18) 195 146 234 (39)
91

Page 92

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Housing and Revenue Account Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
ADMINISTRATION
PRINTING AND STATIONERY 79 0 74 5 74 5 79 67 73 6
BULK PRINTING 68 0 59 9 59 9 68 0 59 9
TELEPHONES 95 0 67 28 67 28 95 65 67 28
MOBILE PHONES 34 0 56 (22) 56 (22) 34 54 98 (64)
ADVERTISING - RECRUITMENT 0 0 3 (3) 3 (3) 0 0 0 0
ADVERTISING - OTHER 12 0 1 11 1 11 12 0 1 11
POSTAGES/COURIERS 171 0 114 57 114 57 171 100 108 63
SMS MESSAGING 3 (3) 5 (5) 5 (5) 0 5 6 (6)
MEMBERSHIP FEES/SUBSCRIPTIONS 38 0 45 (7) 45 (7) 38 41 45 (7)
MEDICAL COSTS 25 0 13 12 13 12 25 14 15 10
LEGAL EXPENSES 44 (38) 16 0 16 0 16 19 19 (3)
PETTY OUTLAYS 4 0 0 4 0 4 4 0 0 4
HOSPITALITY / CIVIC RECOGNITION 1 (1) 5 (5) 5 (5) 0 2 3 (3)
GIRO BANK AGENCY FEES 4 0 4 0 4 0 4 0 4 0
PAYPOINT AGENCY FEES 32 (19) 31 (18) 31 (18) 13 28 31 (18)
INTERNET AGENCY FEES 3 0 3 0 3 0 3 0 3 0
OTHER ADMIN COSTS 15 0 20 (5) 20 (5) 15 16 18 (3)
CONFERENCES - OFFICIALS 7 0 1 6 1 6 7 0 1 6
INTERNAL SUPPORT SERVICES ALLOCATION 5,020 0 5,020 0 5,020 0 5,020 0 5,020 0
ADMINISTRATION 5,655 (61) 5,537 67 5,537 67 5,604 411 5,571 33
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 3,055 0 2,778 7 2,778 7 2,785 1,804 2,778 7
OTHER LOCAL AUTHORITIES 1 (1) 3 (3) 3 (3) 0 3 3 (3)
GRANTS TO VOLUNTARY ORGANISATIONS 3 0 0 3 0 3 3 (2) 0 3
PAYMENTS TO VOLUNTARY ORGANISATIONS 31 0 6 25 6 25 31 12 13 18
PAYMENTS TO OTHER BODIES 47 (15) 725 (423) 725 (423) 302 542 725 (423)
ASSISTANCE TO HOME OWNERS 0 0 0 0 0 0 0 18 0 0
PRIVATE INDIVIDUALS - GENERAL 150 0 150 0 150 0 150 (3) 150 0
PAYMENT TO OTHER BODIES 3,287 (16) 3,662 (391) 3,662 (391) 3,271 2,374 3,669 (398)
PAYMENT TO CONTRACTORS
PAYMENT TO PRIVATE CONTRACTOR 116 (36) 80 0 80 0 80 80 80 0
PAYMENT TO EXTERNAL CONSULTANTS 20 0 20 0 20 0 20 0 20 0
PAYMENT TO CONTRACTORS 136 (36) 100 0 100 0 100 80 100 0
FINANCING CHARGES
INTEREST-DEBT CHARGES 16,620 0 14,594 0 14,594 0 14,594 4,405 14,594 0
I.T. EQUIPMENT LEASING-CONTRACT 67 0 98 (31) 98 (31) 67 170 98 (31)
CFCR 35,633 0 35,633 0 35,633 0 35,633 26,672 35,633 0
INTEREST ON REVENUE BALANCES (825) 0 0 0 0 0 0 0 0 0
FINANCING CHARGES 51,495 0 50,325 (31) 50,325 (31) 50,294 31,247 50,325 (31)
TOTAL EXPENDITURE 138,000 (36) 138,096 (201) 138,103 (239) 137,895 91,661 137,841 54
INCOME
CONTRIBUTIONS FROM OTHER BODIES 0 0 0 0 0 0 0 (8) (8) 8
SALES - DEPARTMENTS OF THE AUTHORITY (1,169) 0 (885) 0 (885) 0 (885) (817) (885) 0
FEES AND CHARGES - GENERAL (5,579) 0 (5,469) (138) (5,469) (138) (5,607) (4,708) (5,469) (138)
RENTAL INCOME (993) 0 (461) (4) (461) (4) (465) 0 (465) 0
HOUSE RENTS (120,751) 0 (121,547) 98 (121,547) 98 (121,449) (101,324) (121,603) 154
LOCK UP RENTS (2,980) 0 (2,870) (41) (2,870) (41) (2,911) (2,868) (2,868) (43)
INSURANCE RECOVERIES (539) 0 (520) 0 (520) 0 (520) (164) (520) 0
OTHER INCOME (1,235) 0 (1,265) 0 (1,265) 0 (1,265) (1,106) (1,265) 0
REALLOCATION OF SUPPORT COSTS (717) 0 (723) 6 (723) 6 (717) 0 (723) 6
YEAR END T/FER TO BALANCE SHEET (4,037) 36 (4,363) 287 (4,363) 287 (4,076) 0 (4,035) (41)
INCOME (138,000) 36 (138,103) 208 (138,103) 208 (137,895) (110,995) (137,841) (54)
NET EXPENDITURE 0 0 (7) 7 0 (31) 0 (19,334) 0 0
92

Page 93

Appendix F
South Lanarkshire Council
Revenue Budget Monitoring Statement
Period Ended 20 February 2026 (No.12)
Social Work Resources
Committee
Revised
Annual Projected
Projected
Outturn % Note
Year to
Date
Budget Outturn Variance Actual
Service Departments :- £m £m £m £m
Performance and Support Services 6.187 5.879 0.308 4.98% 4.595
Children and Families 52.740 50.635 2.105 3.99% 43.305
Adults and Older People 192.159 190.909 1.250 0.65% 165.830
Justice and Substance Misuse 0.881 0.199 0.682 77.41% 0.289
Total Social Work Resources 251.967 247.622 4.345 1.72% 214.019
6
93

Page 94

Social Work Resources Variance Analysis 2025/26 (Period 12) 
Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs  3,829k under Admin & Clerical Staff – 497k under 
Basic Grade Social Workers – 2,301k
under 
Adult and Older People –
166k under 
Performance and
Support – 202k under 
Justice – 103k under 
Children and Family -
864k under 
Adult and Older People –
1,197k under 
Justice - 228k under 
This relates to the underspends
to Scheduling Assistant
vacancies in Homecare, which
are being recruited. This is offset
by overtime costs for Managerial
Support Specialist Staff (below).   
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of vacancies
which are actively being
recruited. 
This is a result of new posts
approved at committee which are
actively being recruited to. This
results in an in-year underspend. 
94

Page 95

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Managerial Support Specialist Staff –
(75k) over 
Care Staff – 131k under 
Instructors - 70k under 
Children and Family -
826k under 
Adult and Older People –
(1,326k) over 
Performance and
Support – 127k under 
Justice - 329k under 
Children & Family –
(119k) over 
Adult & Older People -
250k under 
Adult & Older People –
70k under 
This is a result of vacancies
which are actively being
recruited. 
This overspend is a result of
turnover being less than
anticipated to date, and overtime
spend to cover the Scheduling
Assistant vacancies in Homecare 
This is a result of vacancies
which are actively being
recruited. 
This is a result of new posts
approved at committee which are
actively being recruited to. This
results in an in-year underspend. 
This overspend is due to the level
of overtime being incurred to
manage staff absences due to
sickness and maternity leave. 
This is a result of vacancies
which are actively being
recruited. 
This underspend relates to
vacancies within day care
services. 
95

Page 96

Subjective Head Variance Subjective line Service / amount Explanation
Employee Costs
(cont.) 
Manual Workers (Home Carers) – 478k
under 
Other Employee Costs – 420k under
Adult and Older People – 
478k under 
Children & Family – 370k
under 
This is a result of vacancies
which are actively being
recruited. 
This is a funding solution
identified as part of the overall
budget recovery plan. 
Property Costs  (165k) over Rates – (122k) over 
Scottish Water – Metered Charges -
(40k) over 
Rent - (51k) over 
Repairs and Maintenance Internal
Contractor - (57k) over 
Adult and Older People –
(115k) over 
Adult and Older People –
(22k) over 
Children & Family –
(14k) over 
Adult and Older People –
(48k) over 
Adult and Older People –
(30k) over 
Additional rates for closed
centers that previously had 100%
relief. 
This overspend is the result of
increased prices. 
This overspend is the result of
increased prices. 
This overspend is in respect of
rental charges for residential care
homes.   
This non-recurring overspend is
due to several small higher than
anticipated spends in relation to
repairs and maintenance across
A&OP services. 
96

Page 97

Subjective Head Variance Subjective line Service / amount Explanation
Property Costs
(cont.) 
Electricity - 98k under 
Gas – 81k under
Adult and Older People –
96k under 
Adult and Older People –
74k under
The underspend reflects a
reduction in price. 
The underspend reflects a
reduction in price.
Supplies and
Services 
128k under Computer Equipment Purchase – 
(119k) over 
Equipment, Apparatus and Tools -
(59k) over 
Aids for Clients – 146k under 
Performance and
Support – (35k) over 
Adult and Older People –
(71k) over 
Adult and Older People –
(43k) over 
Performance and
Support – (16k) over 
Adult and Older People –
148k under 
The overspend is non-recurring
due to the purchase of additional
office equipment required. 
The overspend is due to non-
recurring spend to replenish IT
equipment within Homecare
service. 
The overspend is non-recurring
due to the purchase of additional
equipment required. 
The overspend is non-recurring
due to the purchase of additional
equipment required. 
The underspend reflects the
requirement to purchase and
replace existing assistive
technology equipment which is
used to support service users to
remain at home. 
97

Page 98

Subjective Head Variance Subjective line Service / amount Explanation
Supplies and
Services (cont.)  Adaptations for Clients – 59k under 
Supplies for Clients – 76k under 
Adult and Older People –
59k under 
Children & Family – 54k
under
The underspend is due to lower
than anticipated spend on
stairlifts and ceiling tracks. 
The spend on supplies can be
ad-hoc in nature and is currently
showing an underspend. 
Transport and
Plant 
(177k) over Pool Car Recharge – Rental Charge
(146k) over 
Other Transport Costs – 81k under 
Fleet Service Charges (120k) over 
Children and Family –
(158k) over 
Adult and Older People –
84k under 
Adult and Older People –
(131k) over 
The overspend reflects the
demand and arrangements for
pool cars. 
The underspend reflects the
current demand for external
service. 
The overspend relates to
slippage in the 2024/25 saving for
the decommissioning of Fleet
buses that are no longer
required. An action plan is being
developed to ensure costs are
reduced to achieve the saving in
full. Alongside an overspend in
Homecare due to aging vehicles.
Administration  (152k) over Mobile Phones – (132k) over  Justice - (34k) over  The overspend relates to cost of
mobile phones reflecting service
delivery. 
98

Page 99

Subjective Head Variance Subjective line Service / amount Explanation   
Performance and
Support – (20k) over 
Children and Family –
(64k) over 
The overspend relates to cost of
mobile phones reflecting service   
The overspend relates to cost of
mobile phones reflecting service
delivery. 
Payment to Other
Bodies 
(385k) over  Payment to Voluntary Organisation -
42k under 
Payment to Other Bodies - 99k under 
Payment to Private Individuals – 189k
under 
Social Work – Foster Parents – (343k)
over 
Children & Family - 66k
under 
Adult and Older People -
47k under 
Children and Family –
53k under 
Children and Family –
195k under 
Children and Family –
(343k) over 
This is a funding solution
identified as part of the overall
budget recovery plan. 
The underspend has arisen from
services which are no longer
being commissioned. 
This is a funding solution
identified as part of the overall
budget recovery plan. 
There has been a reduction in the
number of supported carers and
use of the shared care scheme.
However, work has been
undertaken to attract new carers
in these areas. 
This recurring overspend is
attributable to the requirement to
purchase external foster
placements.
99

Page 100

Subjective Head Variance Subjective line Service / amount Explanation
Payment to Other
Bodies (cont.)
Social Work – Adoption Allowance –
(395k) over 
Children and Family –
(395k) over 
This overspend relates to the
number of adoptive carers being
paid an ongoing adoption
allowance. It also relates to
interagency adoption payments
where carers have been
identified out with South
Lanarkshire. 
Payment to
Contractors 
1,030k under Payment to Private Contractors -
Payments to Col Orgs-Care Element –
400k under 
Payment to Private Contractors –
Secure Accommodation - 562k under 
Payment to Private Contractors – 
Respite  – 246k under 
Payment to Private Contractors –
Daycare – (299k) over 
Children and Family – 
400k under 
Children and Family – 
562k under 
Children and Family –
41k under 
Adult and Older People –
205k under 
Adult and Older People –
(299k) over 
This underspend represents a
temporary funding solution as
part of the overall budget
recovery plan. 
This underspend reflects the
current demand for Council
funded secure placements which
have reduced in 2025/26. 
This underspend relates to the
demand for community-based
respite. 
This underspend relates to the
demand for community-based
respite. 
This overspend reflects the
current demand for this day
opportunity services. 
100

Page 101

Subjective Head Variance Subjective line Service / amount Explanation 
Payment to Private Contractors – 
Home Support – 143 under 
Adult and Older People –
143k under 
This underspend reflects lower
demand for external home
support service. 
Transfer
Payments 
(474k) over Direct Assistance to Persons – (453k)
over 
Children and Family –
(434k) over 
This overspend is due to budget
pressure continuing into 2025/26,
an increase in demand for kinship
care allowances and an increase
to the net cost to the Council
arising from the migration to
Universal Credit which has
resulted in the loss of child tax
credits from some kinship carers.
Income  743k over
recovered
Contributions from Other Bodies – 292k
over recovered 
Fees and Charges – General – 192k
over recovered 
Children and Family –
164k over recovered 
Adult and Older People –
108k over recovered 
Children and Family –
53k over recovered 
This over recovery is due to the
level of Unaccompanied Asylum-
Seeking Children (UASC) income
being received for children
seeking asylum. 
This over recovery of income
relates to non-recurring
reimbursement of costs. 
This is due to the recovery of
unused direct payments. This
over recovery if offsetting small
overspends in the current year’s
Direct Payments and community
outreach services within Children
and Family.
101

Page 102

* The underlined variances represent new variances since the last report.
Subjective Head Variance Subjective line Service / amount Explanation
Income (cont.)   
Fees and Charges - Other Local
Authorities – 95k over recovered 
Other Income – 89k over recovered
Adult and Older People –
143k over recovered 
Children and Family –
78k over recovered 
Adult and Older People –
86k over recovered 
This over recovery relates to non-
recurring income received in
respect of recovery of prior year
care costs from service users. 
This over recovery is due to a
recharge to other local authorities
for interagency adoption fees. 
This over recovery of income
relates to non-recurring
reimbursement of costs. 
102

Page 103

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Social Work Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
EMPLOYEE COSTS
APT&C BASIC 6,373 417 6,286 529 6,258 555 6,794 5,003 6,241 553
APT&C OVERTIME 152 (152) 165 (165) 168 (168) 0 155 168 (168)
APT&C SUPERANNUATION 392 54 371 74 368 77 445 318 368 77
APT&C NIC 689 43 679 32 682 29 711 598 676 35
SOCIAL WORKERS BASIC GRADE BASIC 13,825 1,112 13,072 2,019 13,169 1,930 15,098 11,717 13,154 1,944
SOCIAL WORKERS BASIC GRADE OVERTIME 91 (19) 98 (36) 87 (30) 57 64 84 (27)
SOCIAL WORKERS BASIC GRADE SUPERANNUATION 914 115 853 177 856 171 1,027 740 853 174
SOCIAL WORKERS BASIC GRADE NIC 1,833 143 1,770 213 1,777 207 1,984 1,548 1,774 210
MAN/SPEC/FWORK BASIC 26,288 (454) 26,371 (25) 26,513 73 26,607 22,858 26,556 51
MAN/SPEC/FWORK OVERTIME 221 (175) 520 (474) 516 (470) 46 459 516 (470)
MAN/SPEC/FWORK SUPERANNUATION 1,673 49 1,670 52 1,649 69 1,718 1,423 1,638 80
MAN/SPEC/FWORK NIC 3,909 (83) 3,474 230 3,462 278 3,739 3,050 3,475 264
CARE STAFF BASIC 17,297 449 16,820 753 17,019 519 17,538 14,553 17,078 460
CARE STAFF OVERTIME 919 (477) 958 (458) 971 (471) 500 842 963 (463)
CARE STAFF SUPERANNUATION 1,060 75 1,006 129 1,017 108 1,125 891 1,018 107
CARE STAFF NIC 2,190 31 2,145 77 2,185 30 2,215 1,912 2,188 27
INSTRUCTORS - SOCIAL WORK BASIC 1,582 53 1,577 58 1,579 56 1,635 1,362 1,571 64
INSTRUCTORS - SOCIAL WORK SUPERANNUATION 103 3 103 3 102 4 106 88 102 4
INSTRUCTORS - SOCIAL WORK NIC 195 2 195 2 195 2 197 169 195 2
MANUAL WORKERS BASIC 29,989 323 29,629 570 29,602 597 30,199 25,904 29,580 619
MANUAL WORKERS OVERTIME 1,311 (76) 1,664 (294) 1,641 (271) 1,370 1,536 1,664 (294)
MANUAL WORKERS SUPERANNUATION 1,922 62 1,847 137 1,843 141 1,984 1,598 1,836 148
MANUAL WORKERS NIC 3,904 19 3,819 104 3,832 91 3,923 3,467 3,918 5
TRAVEL AND SUBSISTANCE 375 22 380 17 381 16 397 242 379 18
OTHER EMPLOYEE COSTS 908 300 731 385 425 420 845 201 425 420
PENSION INCREASES 328 0 332 (4) 332 (4) 328 272 332 (4)
STRAIN ON THE FUND 5 (5) 5 (5) 5 (5) 0 12 7 (7)
EMPLOYEE COSTS 118,448 1,831 116,540 4,100 116,634 3,954 120,588 100,982 116,759 3,829
PROPERTY COSTS
RATES 357 7 479 (117) 477 (115) 362 463 484 (122)
SCOTTISH WATER - UNMETERED CHARGES 1 0 1 0 1 0 1 0 1 0
SCOTTISH WATER - METERED CHARGES 177 (2) 217 (40) 217 (40) 177 161 217 (40)
RENT 555 (13) 587 (40) 598 (51) 547 579 598 (51)
PROPERTY INSURANCE 292 0 293 (1) 293 (1) 292 292 293 (1)
SECURITY COSTS 2 0 2 0 3 (1) 2 7 35 (33)
GROUND MAINTENANCE 0 0 12 0 12 0 12 12 12 0
REPAIRS & MAINTENANCE - INTERNAL CONTRACTOR 24 (10) 73 (37) 73 (37) 36 97 93 (57)
LIFE CYCLE MAINTENANCE 0 0 1 (1) 1 (1) 0 1 1 (1)
REPAIRS & MAINTENANCE - EXTERNAL CONTRACTOR 36 (10) 29 (1) 38 (10) 28 45 49 (21)
ELECTRICAL HEATING MAINTENANCE 0 0 0 0 0 0 0 5 0 0
ELECTRICITY  - CONTRACT 707 0 564 98 564 98 662 244 564 98
ELECTRICITY - NON CONTRACT 0 0 0 0 0 0 0 5 0 0
GAS 471 0 405 81 405 81 486 297 405 81
FIXTURE & FITTINGS 37 (27) 45 (13) 46 (14) 32 47 46 (14)
JANITOR SERVICE 1 (1) 0 0 0 0 0 0 0 0
CLEANING CONTRACT 393 0 379 9 379 9 388 372 379 9
CLEANING AND JANITORIAL SUPPLIES AND EQUIPMENT 118 0 132 (14) 132 (14) 118 114 132 (14)
HEALTH & HYGIENE MATERIALS 86 0 87 (1) 87 (1) 86 76 87 (1)
AKINDOAK CLEANING 9 0 9 0 9 0 9 6 9 0
REFUSE UPLIFT 39 0 41 (2) 41 (2) 39 32 41 (2)
REMOVAL & STORAGE COSTS 1 0 7 (5) 7 (5) 2 8 10 (8)
OTHER PROPERTY COSTS 142 (7) 175 (18) 175 (18) 175 53 163 12
PROPERTY COSTS 3,448 (63) 3,538 (102) 3,558 (122) 3,454 2,916 3,619 (165)
SUPPLIES AND SERVICES
COMPUTER EQUIPMENT PURCHASE 943 (131) 1,005 (75) 1,002 (72) 930 1,027 1,049 (119)
COMPUTER EQUIPMENT MAINTENANCE 27 0 11 16 11 16 27 10 11 16
I.T. EQUIPMENT MAINT-CONTRACT 179 0 183 (7) 181 (5) 176 16 181 (5)
I.T. ELECTRONIC MESSAGING 97 0 121 (24) 120 (23) 97 0 120 (23)
EQUIPMENT, APPARATUS AND TOOLS 123 (9) 112 (2) 112 (2) 110 77 169 (59)
SMALL TOOLS 4 0 10 (6) 10 (6) 4 5 7 (3)
AIDS FOR CLIENTS 979 1 659 201 696 164 860 448 714 146
ADAPTATIONS FOR CLIENTS 981 0 827 46 808 65 873 588 814 59
SUPPLIES FOR CLIENTS 313 36 276 76 276 76 352 208 276 76
FURNITURE - OFFICE 2 (1) 13 (12) 12 (11) 1 13 24 (23)
FURNITURE - GENERAL 0 0 42 (8) 38 (4) 34 39 38 (4)
FURNISHINGS (INCL. CROCKERY & LINEN) 15 0 24 (5) 24 (5) 19 19 25 (6)
MATERIALS 10 0 2 8 1 9 10 (3) 1 9
MATERIALS, APPARATUS AND EQUIPMENT 5 (3) 12 (10) 11 (9) 2 13 12 (10)
TV LICENCES - EDUCATION 0 0 4 (4) 0 0 0 2 2 (2)
PROVISIONS 225 (3) 222 (1) 223 (2) 221 198 226 (5)
FOOD PURCHASES WITHIN CONTRACT 437 0 406 46 406 46 452 345 408 44
FOOD PURCHASES OUTWITH CONTRACT 0 0 2 (2) 2 (2) 0 0 2 (2)
BEVERAGES 50 0 42 8 42 8 50 34 42 8
SCHOOL MILK 34 0 33 1 33 1 34 28 34 0
PROTECTIVE CLOTHING & UNIFORMS 1,247 0 1,416 41 1,416 41 1,457 1,169 1,433 24
LAUNDRY COSTS 2 1 6 (3) 6 (3) 3 6 6 (3)
OTHER SUPPLIES AND SERVICES 41 (3) 35 3 33 5 38 25 33 5
CATERING - CONTRACT 387 (20) 367 0 361 6 367 349 361 6
CATERING - OUTWITH CONTRACT 31 0 14 7 14 7 21 16 15 6
ARTIST FEES/ PERFORMING ARTS 0 0 2 (2) 2 (2) 0 3 3 (3)
OUTSOURCED MAIL 1 (1) 2 (2) 2 (2) 0 1 2 (2)
DELIVERY CHARGE 0 0 2 (2) 2 (2) 0 7 2 (2)
SUPPLIES AND SERVICES 6,133 (133) 5,850 288 5,844 294 6,138 4,643 6,010 128
103

Page 104

South Lanarkshire Council
Period 7 Period 7 Period 10 Period 10 Period 11 Period 11 Revised Period 12 Period 12 Period 12
Social Work Resource - Total Forecast Forecast Forecast Forecast Forecast Forecast Annual  Actual Forecast Forecast
(Projected Variance (Projected Variance (Projected Variance Budget to Date (Projected Variance
Expenditure / Income Variance Trends 2025/2026 Outturn) Outturn) Outturn) 25/26 Outturn)
TRANSPORT AND PLANT
FLEET SERVICES - FUEL 0 0 1 (1) 1 (1) 0 1 1 (1)
POOL CAR CHARGES-RENTAL 277 (108) 301 (132) 312 (143) 169 189 315 (146)
POOL CAR CHARGES-FUEL 10 5 0 15 0 15 15 0 0 15
POOL CAR CHARGES-ADDITIONAL COSTS 4 (1) 3 0 3 0 3 2 3 0
OTHER TRANSPORT COSTS 807 0 720 81 721 80 801 593 720 81
INSURANCE 24 0 24 0 24 0 24 21 24 0
FLEET SERVICE CHARGES 3,407 (124) 3,333 (50) 3,391 (108) 3,283 3,300 3,403 (120)
HIRE OF EXTERNAL VEHICLES 7 0 1 6 1 6 7 2 1 6
HIRE OF SKIPS 0 0 2 (2) 1 (1) 0 2 1 (1)
EXTERNAL TRANSPORT CONTRACT 0 0 5 (5) 5 (5) 0 7 7 (7)
PUPIL TRANSPORT-S'CLYDE PASSENGER TRANSPORT 0 0 3 (3) 3 (3) 0 3 3 (3)
PUPIL TRANSPORT - OTHER 10 0 11 (1) 11 (1) 10 8 11 (1)
TRANSPORT AND PLANT 4,546 (228) 4,404 (92) 4,473 (161) 4,312 4,128 4,489 (177)
ADMINISTRATION
PRINTING AND STATIONERY 112 (21) 97 (15) 95 (13) 82 90 101 (19)
TELEPHONES 210 (10) 172 28 172 28 200 108 168 32
MOBILE PHONES 282 0 664 (382) 398 (116) 282 326 414 (132)
ADVERTISING - RECRUITMENT 4 0 4 0 4 0 4 0 4 0
ADVERTISING - OTHER 10 0 1 9 1 9 10 2 1 9
POSTAGES/COURIERS 54 0 46 8 47 7 54 45 47 7
SMS MESSAGING 2 0 2 0 2 0 2 0 2 0
MEMBERSHIP FEES/SUBSCRIPTIONS 73 (9) 82 (8) 80 (6) 74 61 80 (6)
INSURANCE 27 0 27 0 27 0 27 27 27 0
MEDICAL COSTS 44 (10) 76 (42) 76 (42) 34 60 76 (42)
LEGAL EXPENSES 509 (52) 531 11 536 (11) 542 524 564 (22)
PETTY OUTLAYS 0 0 1 (1) 2 (2) 0 1 1 (1)
HOSPITALITY / CIVIC RECOGNITION 2 0 5 (3) 5 (3) 2 3 5 (3)
PAYPOINT AGENCY FEES 0 0 4 (4) 4 (4) 0 3 4 (4)
OTHER ADMIN COSTS 15 0 8 7 8 7 15 5 8 7
CONFERENCES - OFFICIALS (incl associated costs) 15 0 12 3 11 4 15 5 12 3
TRAINING 60 (1) 40 19 40 19 59 28 40 19
INTERNAL SUPPORT SERVICES ALLOWANCES 410 0 410 0 410 0 410 410 410 0
ADMINISTRATION 1,829 (103) 2,182 (370) 1,918 (123) 1,812 1,698 1,964 (152)
PAYMENT TO OTHER BODIES
OTHER COMMITTEES OF THE AUTHORITY 165 0 185 0 185 0 75 15 75 0
OTHER LOCAL AUTHORITIES 25 0 25 0 25 0 25 0 25 0
GRANTS TO VOLUNTARY ORGANISATIONS 23 0 23 0 23 0 23 23 23 0
PAYMENTS TO VOLUNTARY ORGANISATIONS 1,641 86 1,775 42 1,775 42 1,817 1,579 1,775 42
PAYMENTS TO OTHER BODIES 1,901 0 1,439 88 1,432 95 1,509 1,076 1,410 99
PAYMENTS TO HEALTH BOARD 1,508 0 1,471 0 1,471 0 1,471 1,384 1,474 (3)
PRIVATE INDIVIDUALS - GENERAL 531 180 586 189 586 189 775 450 586 189
SOCIAL WORK - FOSTER PARENTS 6,994 (424) 6,913 (343) 6,913 (343) 6,570 6,131 6,913 (343)
SOCIAL WORK - FOSTER PARENTS 94 0 94 0 94 0 94 57 94 0
SOCIAL WORK - ADOPTION ALLOWANCES 936 (286) 1,045 (395) 1,045 (395) 650 974 1,045 (395)
DIRECT PAYMENTS 11,301 (40) 11,336 (92) 11,328 (84) 11,244 10,251 11,218 26
PAYMENT TO OTHER BODIES 25,119 (484) 24,892 (511) 24,877 (496) 24,253 21,940 24,638 (385)
PAYMENT TO CONTRACTORS
PAYMENT TO LOCAL AUTHORITY 0 0 0 0 0 0 0 4 4 (4)
PAYMENT TO PRIVATE CONTRACTOR 156,924 (430) 154,603 938 154,762 859 155,604 129,459 154,577 1,027
PAYMENT TO EXTERNAL CONSULTANTS / PROFESSIONAL SERVICES 153 (14) 127 12 128 11 139 116 132 7
PAYMENT TO CONTRACTORS 157,077 (444) 154,730 950 154,890 870 155,743 129,579 154,713 1,030
TRANSFER PAYMENTS
DIRECT ASSISTANCE TO PERSONS 4,861 (516) 4,796 (451) 4,796 (451) 4,345 4,452 4,798 (453)
SECTION PAYMENTS 38 (8) 51 (21) 51 (21) 30 51 51 (21)
TRANSFER PAYMENTS 4,899 (524) 4,847 (472) 4,847 (472) 4,375 4,503 4,849 (474)
FINANCING CHARGES
LEASING CHARGES - OPERATIONAL (1) 0 1 (2) (1) 0 (1) 0 (1) 0
I.T. EQUIPMENT LEASING - CONTRACT 395 0 424 (26) 425 (27) 398 478 430 (32)
FINANCING CHARGES 394 0 425 (28) 424 (27) 397 478 429 (32)
TOTAL EXPENDITURE 321,893 (148) 317,408 3,763 317,465 3,717 321,072 270,867 317,470 3,602
INCOME
NON RELEVANT GOVERNMENT GRANT (8,838) 0 (8,810) 0 (8,810) 0 (8,810) (7,313) (8,810) 0
DWP SUBSIDY 0 0 0 0 (15) 15 0 (14) (14) 14
RESOURCE TRANSFER INCOME FROM (25,786) 0 (25,786) 0 (25,788) 2 (25,786) (19,340) (25,788) 2
CONTRIBUTIONS FROM OTHER BODIES (791) 0 (1,023) 194 (1,023) 194 (829) (735) (1,121) 292
SALES - SALE OF MEALS (31) 17 (41) 12 (45) 16 (29) (48) (48) 19
FEES AND CHARGES - GENERAL (6,739) 87 (6,916) 212 (6,911) 207 (6,704) (6,916) (6,896) 192
FEES AND CHARGES - OTHER LOCAL AUTHORITIES (443) 0 (496) 53 (538) 95 (443) (527) (538) 95
CHARGES TO HEALTH BOARDS (26,345) 0 (25,723) 19 (25,724) 18 (25,706) (21,227) (25,724) 18
FEES AND CHARGES - DEPARTMENTS (218) 0 (222) 4 (222) 4 (218) (65) (222) 4
RENTAL INCOME (45) 0 (53) 8 (53) 8 (45) (42) (53) 8
OTHER INCOME (179) 44 (203) 68 (194) 59 (135) (211) (224) 89
ACCOMMODATION INCOME FROM USERS (400) 0 (410) 10 (410) 10 (400) (410) (410) 10
INCOME (69,815) 148 (69,683) 580 (69,733) 628 (69,105) (56,848) (69,848) 743
NET EXPENDITURE 252,078 0 247,725 4,343 247,732 4,345 251,967 214,019 247,622 4,345
104