Agenda Document Pack - Executive Committee - 24/01/2024

South Lanarkshire Council · 24 January 2024
Back to Executive Committee — 24 January 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 16 January 2024 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 24 January 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson,
Robert Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea
Cowan, Maureen Devlin, Gladys Ferguson-Miller, Lynsey Hamilton, Mark Horsham, Eileen
Logan, Katy Loudon, Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny
McCreary, Lesley McDonald, Mark McGeever, Davie McLachlan, Richard Nelson, Mo
Razzaq, Kirsten Robb, John Ross, David Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Elise Frame, Graeme Horne,
Martin Hose, Susan Kerr, Ross Lambie, Elaine McDougall, Norman Rae, Graham Scott,
David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
The minutes of the meeting of the Executive Committee held on 22
November 2023 were submitted for approval as a correct record.  (Copy
attached) 
5 - 14 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 1 April to 1 December 2023
and Probable Outturn
Report dated 10 January 2024 by the Chief Executive.  (Copy attached) 
15 - 28 
4 Capital Budget 2023/2024 and Monitoring for Period 9 - 1 April to 1
December 2023
Report dated 10 January 2024 by the Chief Executive.  (Copy attached) 
29 - 40 
5 Additional Funding from Scottish Government and Other External
Sources
Report dated 5 January 2024 by the Chief Executive.  (Copy attached) 
41 - 44 
Item(s) for Decision 
6 Recommendations Referred by the Finance and Corporate Resources
Committee - Non-Domestic Rates - Empty Property Relief Policy
Report dated 3 January 2024 by the Chief Executive.  (Copy attached) 
45 - 48 
7 Land and Property Transfers and Disposals
Report dated 15 December 2023 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
49 - 52 
Item(s) for Noting 
8 Update on the Budget Strategy for 2024/2025
Report dated 9 January 2024 by the Chief Executive.  (Copy attached) 
53 - 62 
9 Commercial Opportunities
Report dated 8 January 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
63 - 66 
10  Representation on Outside Bodies - Clydesdale Citizens' Advice
Bureau
Report dated 4 January 2024 by the Chief Executive.  (Copy attached) 
67 - 68 
Urgent Business 
2

Page 3

11  Urgent Business
Any other items of business which the Chair decides are urgent. 
Exclusion of Press and Public 
12  Exclusion of Press and Public
It is recommended that the Committee makes the following resolution:-   
"That, in terms of Section 50A(4) of the Local Government (Scotland) Act
1973, the press and public be excluded from the meeting for the following
item(s) of business on the grounds that it is likely that there will be
disclosure of exempt information in terms of Paragraphs 6 and 8 of Part I
of Schedule 7A of the Act." 
Item(s) for Decision 
13  Capital Budget 2023/2024 - Exception for Greenhills Roads Capital
Project
• Exempt information in terms of Paragraph 6 of Part I of Schedule 7A of
the Act
• Exempt information in terms of Paragraph 8 of Part I of Schedule 7A of
the Act 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 22 November 2023 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Margaret Cooper,
Councillor Andrea Cowan, Councillor Margaret Cowie (substitute for Councillor Mo Razzaq),
Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller, Councillor Elise Frame (substitute for
Councillor Mark Horsham), Councillor Lynsey Hamilton, Councillor Eileen Logan, Councillor Katy
Loudon, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Catherine McClymont,
Councillor Kenny McCreary, Councillor Lesley McDonald, Councillor Mark McGeever, Councillor
Davie McLachlan, Councillor Richard Nelson, Councillor John Ross, Councillor David Shearer,
Councillor Margaret B Walker 
Councillors' Apologies:
Councillor Gerry Convery (Depute), Councillor Mark Horsham, Councillor Mo Razzaq, Councillor
Kirsten Robb 
Attending:
Chief Executive’s Service
C Sneddon, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director
Education Resources
C McKenzie, Executive Director
Finance and Corporate Resources
P Manning, Executive Director; C Fergusson, Head of Finance (Transactions); M Gordon,
Administration Assistant; J Kerr, Community Engagement Manager; T Little, Head of Communications
and Strategy; P MacRae, Administration Adviser; G McCann, Head of Administration and Legal
Services; M Milne, Head of Personnel Services
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
Chair’s Remarks
The Chair advised of an item of urgent business in relation to the reduction in the number of specialist
palliative care beds at Kilbryde Hospice which would be considered at the appropriate point in the
meeting. 
1 Declaration of Interests 
The following interest was declared:- 
Councillor(s) Item(s) Nature of Interest(s)
Logan Item of Urgent Business – Reduction in
Number of Specialist Palliative Care Beds at
Kilbryde Hospice
Member of the Board of
NHS Lanarkshire
2
5

Page 6

2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 11 October 2023 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring for Period 1 April 2023 to 6 October 2023 
A report dated 23 October 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on the overall financial position of the Council’s General Fund Revenue Account
and Housing Revenue Account for the period 1 April to 6 October 2023. 
At 6 October 2023, the position on the General Fund Revenue Account was breakeven.  Details
were given on:- 
 budget pressures within Children and Families Services
 the position within the Adult and Older People Service following the outcome of the job
evaluation exercise for home carers
 maintenance of teacher and pupil support numbers 
The Housing Revenue Account showed a breakeven position at 6 October 2023, as detailed in
Appendix 2 of the report. 
The Committee decided: 
(1) that the break-even position on the General Fund Revenue Account at 6 October 2023, as
detailed in section 4 and Appendix 1 of the report, be noted; and 
(2) that the break-even position on the Housing Revenue Account at 6 October 2023, as
detailed in section 5 and Appendix 2 of the report, be noted. 
[Reference:  Minutes of 11 October 2023 (Paragraph 3)] 
4 Capital Budget 2023/2024 and Monitoring for Period 7 - 1 April 2023 to 6 October
2023 
A report dated 1 November 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on progress of the General Fund Capital Programme and the Housing Capital
Programme for the period 1 April to 6 October 2023. 
At its meeting on 11 October 2023, the Committee had approved a General Fund Capital
Programme for 2023/2024 totalling £80.356 million.  A revised programme of £78.901 million was
now anticipated which included proposed adjustments to the programme totalling a net decrease
of £1.455 million.  Those were detailed in Appendix 1 of the report.   
At 6 October 2023, £24.057 million had been spent on the General Fund Capital Programme,
against a budget for the period of £24.144 million, resulting in spending being slightly behind
programme in the sum of £0.087 million.  Actual funding received to 6 October 2023 totalled
£48.992 million.  The programme spend and funding for the General Fund for the period was
detailed in appendices 2 and 3 of the report. 
The Housing Capital Programme 2023/2024, approved by the Executive Committee at its meeting
on 11 October 2023, totalled £69.596 million.  As a result of utility delays in respect of the project
for 50 units at Brackenhill Farm, Hamilton, it was proposed that £2.153 million be slipped into the 
6

Page 7

2024/2025 capital programme to better reflect the anticipated timing of spend.  A revised Housing
Capital Programme of £67.443 million was now anticipated.  Programmed funding for the year
also totalled £67.443 million and details of the position of the programme at 6 October 2023 were
provided in Appendix 4 of the report. 
At 6 October 2023, the budget for the Housing Capital Programme amounted to £23.016 million. 
Expenditure for the period totalled £23.513 million and actual funding received to 6 October 2023
also amounted to £23.513 million. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the adjustments to the General Fund programme, as detailed at Appendix 1 of the
report, and the Housing Programme, as detailed in section 5.2 of the report, be approved; 
(2) that the period 7 position at 6 October 2023 of the General Fund Capital Programme, as
detailed in appendices 2 and 3 of the report and the Housing Capital Programme, as detailed
in Appendix 4 of the report, be noted; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference:  Minutes of 11 October 2023 (Paragraph 4)] 
5 Additional Funding from Scottish Government and Other External Sources 
A report dated 23 October 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on additional funding, totalling £0.579 million, which had been made available to
the Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Capital Funding 
Resource 2023/2024 
(£m) 
Community and Enterprise 0.579 
Total 0.579 
The Committee decided: that the report be noted. 
[Reference: Minutes of 11 October 2023 (Paragraph 5)] 
6 Employee Workforce Monitoring Information April to September 2023 Summary 
A report dated 25 October 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on workforce monitoring information relating to the Council for the period April to
September 2023 as follows:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 employee development
 labour turnover/analysis of leavers and exit interviews 
7

Page 8

 recruitment monitoring
 staffing watch as at 9 September 2023 
Officers responded to members’ questions on various aspects of the report and undertook to
provide information on the cost of absence, in monetary terms, to the Council. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 1 December 2021 (Paragraph 6)] 
7 Community Plan Quarter 4 Progress Report 2022-2023 and Annual Outcomes
Improvement Report 
A report dated 1 November 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on progress against the outcomes within the Community Plan 2022/2023 as at 31
March 2023. 
The South Lanarkshire Community Plan, approved in October 2017, set out the priorities and
outcomes for the Community Planning Partnership over a 10-year period from 2017 to 2027. 
Subsequently, a revised Community Plan had been approved by the Partnership Board on 22
June 2022 which covered the period 2022 to 2032.  In order to meet the requirement to publish a
Local Outcomes Improvement Plan, as required by the Community Empowerment Act (Scotland)
Act 2015, it had been agreed that an Annual Outcomes Improvement report would be published
alongside the Community Plan Progress Report. 
The Quarter 4 progress report, attached as Appendix 1 to the report, summarised progress against
the Community Plan to March 2023.  The Annual Outcome Improvement Report, which detailed
the progress of the South Lanarkshire Community Planning Partnership during 2022/2023, was
attached as Appendix 2 to the report. 
The report provided a summary of progress against the outcomes of the Community Plan using a
traffic light system of red/amber/green.  A blue status had also been included which indicated that
the action to achieve change had been completed.  Of the 32 measures contained within the Plan,
none had been completed, 26 were judged to be on course to achieve the targets set (green), 1
was judged to be considerably off target (red) and 3 were judged to be slightly off target (amber). 
There were 2 measures which would be reported later.   
Details were given on:- 
 the 3 amber and 1 red measures, together with explanatory commentary
 key achievements for 2022/2023, in relation to priority themes 
There followed a full discussion during which officers responded to members’ questions,
particularly in relation to issues arising from the indicator in respect of homelessness. 
The Committee decided: 
(1) that the progress made to date against the outcomes within the Community Plan 2022/2032,
as detailed in Appendix 1 of the report, be noted; and 
(2) that the content of the Annual Outcomes Improvement Report, as detailed in Appendix 2 of
the report, be noted. 
[Reference:  Minutes of 2 November 2022 (Paragraph 6)]  
8

Page 9

8 Land and Property Transfers and Disposals 
A report dated 31 October 2023 by the Executive Director (Housing and Technical Resources)
was submitted on proposed actions in respect of land and property transactions. 
The recommendations had been made in terms of agreed procedures for dealing with surplus
land and property. 
The Committee decided: that the land and property, as detailed in Appendix A of the
report, be declared surplus to requirements. 
9 Cost of Living – Support 
A report dated 4 July 2023 by the Executive Director (Finance and Corporate Resources) was
submitted providing an overview of the support provided to households in South Lanarkshire in
response to the cost of living crisis and seeking agreement for the direction of funds to support
further activity. 
While inflationary pressures were easing, nevertheless, the financial pressure on household
incomes remained significant.  There were signs that energy costs were starting to ease, however,
they remained significantly higher than pre February 2022 costs. 
In the period 2023/2024 and 2024/2025, the Money Matters Advice Service (MMAS) would
continue to support residents of South Lanarkshire experiencing food and fuel poverty by
distributing cash vouchers through the Financial Wellbeing Support Fund in addition to continuing
to provide referrals to food and fuel bank providers. 
MMAS was working with the following organisations to provide residents with energy top up
vouchers:- 
 The Fuel Bank Foundation
 the MEGA Fund
 Scottish Power Hardship Fund
 Clydesdale Food Bank 
MMAS also referred residents to Advice Direct Scotland in relation to grants available to residents
who did not pay for their energy through pre-payment meters and to Home Energy Scotland in
relation to energy advice through their mentoring schemes. 
Details were given on support offered by the Benefits and Revenues Service including:- 
 support for households which had fallen into arrears with or were experiencing difficulty
paying council tax
 grants from the Scottish Welfare Fund
 support for low income households to pay their rent 
 payment to low income households of School Clothing Grants and Free School Meals’
(FSM) payments for school holidays and school strike days
 National Energy Support Schemes, administered by the Service 
Details were also given on support for tenants provided by Housing Services and the write off of
school meal debt. 
In view of the rise in referrals to foodbanks, it was proposed to allocate £28,000 from the cash
payments made by MMAS to support foodbanks.  This would allow the 7 foodbanks in South
Lanarkshire to benefit from a cash payment of £4,000 to support their operational costs such as
utility costs, volunteer expenses and insurance. 
9

Page 10

It was also proposed to provide a further £100 payment to each looked after young person
currently supported.  An additional £40,000 one off payment would be made to the Council’s
partner, Who Cares Scotland, to ensure support for care experienced young people over the
festive period.  The cost of this initiative amounted to £0.135 million, funded from an allocation
from the cash payments made by MMAS. 
The Tackling Poverty Partnership Group in the Community Planning Partnership had produced
an online resource and printed booklet entitled “Money is Not the Only Problem”.  Following the
success of this resource, it was proposed that an allocation of £10,000 be made from funds
allocated from cash payments made by MMAS to cover the cost of a further production run of
20,000 copies of the booklet. 
The Council would continue to provide support from a range of services and budgets available,
however, the challenges councils were facing constituted a limiting factor in the level of support
available to households in South Lanarkshire. 
The Committee decided: 
(1) that the range of support being provided by the Council to households in response to the
ongoing impact of the cost-of-living crisis be noted; and 
(2) that the allocation of £0.173 million from the cash payments being delivered by Money
Matters Advice Service to support foodbanks, looked after children and the production of
‘Money is Not the Only Problem’ booklets be approved. 
[Reference:  Minutes of 16 August 2023 (Paragraph 6)] 
In terms of Standing Order No 14, the Chair adjourned the meeting following this item of business at
11.15am.  The meeting reconvened at 11.25am 
10 2024/2025 Revenue Budget Update and Savings Proposals 
A report dated 10 November 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on the budget position for 2024/2025, including an update to the budget strategy
and the savings proposals. 
At its meeting on 21 June 2023, the Committee was advised of an expected budget gap for
2024/2025 of £29.207 million.  Options to address the budget gap had been developed and
savings options, presented to members at a Seminar held on 9 November 2023, were provided
at section 6 of the report. 
Since the budget strategy had been approved in June 2023, there had been developments in
relation to external factors which could influence the Council’s budget position.  Officers were
working to identify means of assisting in managing budget pressures. 
Information was provided on :- 
 the budget strategy in relation to external factors which could offset the budget gap.  Those
related to the 2023/2024 pay award offer which would result in a recurring financial burden
in 2024/2025, for which the Scottish Government had indicated that it would provide £94
million of funding nationally, as well as the recent valuation of Strathclyde Pension Fund
which had resulted in the reduction of employer pension contributions from the current
19.3% to 6.5% for 2024/2025 and 2025/2026, rising to 17.5% on 2026/2027.  The use of the
benefit of pay award funding, together with the pension contribution benefit, would see a
reduction in the budget gap  from £29.2 million to £22.7 million as detailed in Appendix 1 of 
10

Page 11

the report.  Potential savings that required to be achieved over the 4 year period 2024/2025
to 2027/2028 were estimated at £96 million as detailed in Appendix 1
 the 2023/2024 Probable Outturn and Potential Contribution towards the 2024/2025 budget
strategy which showed a number of budget areas where previously unanticipated variances
were emerging.  Those related to Empty Property Relief (EPR), where current estimates
showed an overspend of £0.700 million, and loan charges, where deposit interest and
underspend from deposit interest and Transformation Fund borrowing, allowing for a
contribution to costs associated with achieving the 2024/2025 savings, amounted to £6
million over 2023/2024 to 2025/2026.  The use of the probable outturn monies over 3 years
would result in a £2 million benefit in 2024/2025, reducing the budget gap further to £20.7
million
 savings proposals, as detailed in Appendix 2, currently totalling £18.589 million.  The
Scottish Government had announced implementation of a Council Tax freeze for 2024/2025
which, it stated, would be fully funded, however, detail on the funding to made available in
relation to the freeze had yet to be received
 Mainstream School Transportation, in particular, details of proposals to consult on changing
the criteria for provision of school transport to match statutory limits, as detailed in Appendix
3 of the report, thereby increasing the distance qualification for free mainstream transport 
It was anticipated that the Council would receive its 2024/2025 Local Government Settlement in
December, following which an update would be provided to members in January 2024. 
Having heard Councillor Fagan, the Committee agreed that recommendation 5 of the report be
amended to exclude primary schools from the consultation on the Distance Qualification Criteria
for Mainstream School Transport. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the update to the budget strategy, as detailed in section 4 of the report, covering
anticipated pay award funding, pension contributions benefits and expected outcomes from
the probable outturn exercise, as detailed in section 5 of the report, be approved; 
(2) that the remaining budget gap of £20.7 million as detailed in Table 2 of the report, be noted; 
(3) that the savings that required to be achieved over the 4 year period, as detailed at section
5.11 and Appendix 1 of the report, amounting to £96 million, be noted; 
(4) that the savings proposals of £18.589 million, as detailed at section 6 and Appendix 2 of the
report, be noted; and 
(5) that the consultation on the Distance Qualification Criteria for Mainstream School Transport,
as detailed in section 7.2 of the report, be approved subject to the exclusion of primary
schools from the process. 
11 Programme for Government 2023 
A report dated 25 October 2023 by the Executive Director (Finance and Corporate Resources)
was submitted providing a summary of the Scottish Government’s Programme for Government
2023/2024 and key items relevant to local government. 
The Scottish Government published its Programme for Government (PfG), which set out the
Government's key legislative and policy priorities for the year ahead, at the beginning of
September each year.    
11

Page 12

99 of the 230 commitments featured in the PfG could be considered to have implications for local
government.  Those were itemised at Appendix 1 of the report together with an assessment of
implications for the Council.  The following issues were of particular significance for local
government:- 
 sustainable Scottish public finances
 public service reform
 working with local government 
 supporting small business 
 delivering fair work for all 
 thriving local and regional economies
 national care service 
 independent living fund
 sport
 tackling poverty
 preventing and ending homelessness and supplying affordable, safe homes
 supporting children and young people
 reforming our education and skills system
 investing in our schools
 circular economy
 culture and major events 
Appendix 1 of the report showed the following for each of the themes identified in the PfG
2022/2023 
 a summary of the relevant element in the Programme
 the focus from a Council perspective
 actions identified
 an indicative timeline and route for reporting to the relevant Committees   
Details were also given on the legislative programme for 2023/2024, contained in the PfG 
Executive Directors would report on relevant aspects of the PfG in their regular monitoring reports
to committee. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 2 November 2022 (Paragraph 11)] 
12 Item of Urgent Business – Reduction in Number of Specialist Palliative Care Beds
at Kilbryde Hospice 
In terms of Standing Order 4(c) of the Council’s Standing Orders on Procedures, the Chair decided
that consideration be given to the following item of business as a matter of urgency. 
Councillor Fagan referred to an item of urgent business which had been tabled, requesting that
the Committee, on a cross party basis, refer the terms of a motion in relation to the Reduction in
the Number of Specialist Palliative Care Beds at Kilbryde Hospice, East Kilbride, to the next
meeting of the Council:- 
 seeking reassurance from NHS Lanarkshire officials that the full complement of Specialist
Palliative Care Beds at Kilbryde Hospice be reinstated at the earliest opportunity 
 urging that senior officers of NHS Lanarkshire work with Kilbryde Hospice to secure a
sustainable model of care and skill mix based on learning from other parts of the country  
12

Page 13

 requesting agreement to write to Jenni Minto, the Scottish Government Minister for Public
Health and Women’s Health, requesting that hospices receive fair and competent funding to
enable them to continue to provide highly valued exceptional specialist palliative care for
those who required it across our communities.  This included highlighting the national
shortage of palliative care consultant staff available to support the operation of hospices
throughout the country 
Following discussion and members having stressed the urgent need to address the current
situation in respect of Kilbryde Hospice, it was proposed that:- 
 the Chief Executive write to the Minister for Public Health and Women’s Health and the Chair
and Chief Executive of NHS Lanarkshire respectively highlighting the concerns detailed in
the terms of the motion circulated to members
 NHS colleagues be asked to arrange a briefing session for members in relation to the issues
raised in respect of Kilbryde Hospice and that consideration be given to inviting the Chief
Executive of Kilbryde Hospice to attend the session
 the matter be considered at the next full Council meeting 
The Committee decided: 
(1) that the Chief Executive write to the Minister for Public Health and Women’s Health and the
Chair and Chief Executive of NHS Lanarkshire respectively highlighting the concerns
detailed in the terms of the motion circulated to members; 
(2) that NHS colleagues be asked to arrange a briefing session for members in relation to the
issues raised in respect of Kilbryde Hospice and that consideration be given to inviting the
Chief Executive of Kilbryde Hospice to attend the session; and 
(3) that the matter be considered at the next full Council meeting. 
Councillor Logan, having declared an interest in this item, left the meeting prior to its consideration 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Chief Executive  
Subject: Revenue Budget Monitoring for Period 1 April to 1
December 2023 and Probable Outturn 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee on the overall financial position of the Council’s General
Fund Revenue Account and Housing Revenue Account for the period 1 April to
1 December 2023 and a projection for the year to 31 March 2024.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that including Resources, Corporate Items and Council Tax, and the proposed
transfer to Reserves, the Council’s outturn underspend of £9.000 million
(section 4.2), be noted;
(2) that the proposed transfers to reserves totalling £14.985 million (section 4.2),
be approved;
(3) that the non-recurring underspend of £1.272 million in the delegated budget to
the Integration Joint Board (IJB) be held in reserves for their use in future years
(section 4.9), be approved;
(4) that the proposed use of £3.000 million of the Council’s outturn underspend be
transferred to Reserves to support budget pressures in 2024/2025 (section
4.17), be approved;
(5) that the proposed use of the remaining £6.000 million of the Council’s outturn
underspend be transferred to Reserves (section 4.18), be approved;
(6) that the redeterminations of 2023/2024 revenue grant funding, as included in
the Local Government Finance Circular 8/2023 (section 6), be noted;
(7) that the underspend of £0.593 million on the General Fund Revenue Account
at 1 December 2023 (section 7.1), be noted; and
(8) that the breakeven position on the Housing Revenue Account at 1 December
2023 and the forecast to 31 March 2024 of breakeven (section 8 and Appendix
4), be noted. 
3. Background
3.1. This overview report will summarise the 2023/2024 Probable Outturn position for the
Council’s General Fund Revenue Account to 31 March 2024.  An Executive Summary
is provided in Section 4, while Section 5 provides the detail of the General Fund outturn
position including details of proposed transfers to Reserves. Section 6 details the
various 2023/2024 revenue grant redeterminations included in the Local Government
Finance Settlement 2024/2025. Sections 7 and 8 provide the position on the General
3
15

Page 16

Fund Account and the Housing Revenue Account for the current period 1 April 2023
to 01 December 2023 respectively.   
3.2. When establishing the probable outturn position for the year, Resources were asked
to take all known commitments into account.  This report details the anticipated spend
for the current year (Appendix 1) and proposes funds to be transferred to reserves for
future commitments (Appendix 2). The report will also detail the position after the
proposed transfers to reserves (Appendix 3) for those known commitments required
in the next financial year.  Finally, Appendix 4 provides the Housing Revenue Account
position. 
4. Executive Summary – 2023/2024 General Services Probable Outturn 
4.1. This report and appendices provide a detailed analysis of the Council’s financial
position.  While the full detail and background is provided in the report, the summary
position including the key highlights is detailed in this Executive Summary. 
4.2. The outturn position after transfers to reserves is an underspend of £9.000 million.
This is including proposed transfers to reserves totalling £14.985 million (Appendix 2).
A summary of the Outturn is detailed in Table 1. 
Table 1: Analysis of Outturn Position After Transfers to Reserves  
£m
Resource Position (section 4.4) (0.511)
Loan Charges (section 4.12) 0.198
Corporate Items (section 4.13) 6.051
Council Tax (section 4.15) 3.262
Probable Outturn Position 9.000 
4.3. Each of these items are detailed below. 
4.4. Resources: As covered in Section 5, Resources are reporting a combined overspend
of £0.511 million.  The position across Resources includes Transfers to Reserves
totalling £1.750 million. These are summarised in section 5.2. 
4.5. Community and Enterprise Resources are showing a breakeven position after
Transfer to Reserves.  This includes a proposed transfer of the Community Led
Investment Monies (£0.200 million) which will spend in 2024/2025. 
4.6. The overall Resource underspend also includes an Education Resources’ overspend
of £0.295 million. 
4.7. In addition, there is an overspend of £0.216 million in Finance and Corporate
Resources which reflects an anticipated overspend on Non-Domestic Rates Empty
Property Relief. 
4.8. Housing and Technical Resources is showing a breakeven position after Transfers to
Reserves.   
4.9. The position for the Social Work Resources Adults and Older People includes a £1.272
million commitment in relation to the element of the budget delegated to the Integrated
Joint Board (IJB).  These monies are part of the Council’s contribution to the IJB and
could have been retained by the Council, however, this assumed commitment allows
the IJB to retain this non-recurring underspend within their reserves earmarked for
future costs, in line with the approach to integrating health and social care budgets. It
16

Page 17

is proposed that these monies will be retained in the Council’s Balance Sheet and will
be available for use by the IJB. 
4.10. The Social Work Resources non-delegated Services position is also breakeven.  This
includes Children and Families.  As reported previously, one-off funding totalling £9.2
million is being used in 2023/2024 to contribute towards the residual pressures of
residential placements and fostering and kinship care.  Ongoing actions on plans to
manage the budget pressures are being pursued by management for the remainder
of 2023/2024.  In addition, the Resource is working towards managing the overall
budget pressure in Children and Families by 2024/2025. 
4.11. All Resource transfers to Reserves are shown in Appendix 2. 
4.12. Loan Charges: There is an in-year underspend of £0.198 million. This is after
proposed Transfers to Reserves (Appendix 2).  This is due to higher than anticipated
deposit interest resulting from the ongoing high interest rates as well as the level of
deposits being higher than originally forecast.  Details are provided in sections 5.9 to
5.12. 
4.13. Corporate Items: There is a net underspend of £6.051 million for Corporate Items
after known commitments and including proposed Transfers to Reserves totalling
£0.983 million.  This is predominantly due to the successful settlement of an
unbudgeted historic VAT claim that was advised to the Council in mid-December 2023. 
This is covered in detail in section 5.14. 
4.14. The Corporate Items position includes the impact of the Council funding its share of
the national pay award for Local Government employees, as per the national
agreement with the Scottish Government.  This totals circa £1 million and has been
met from Reserves in 2023/2024.  These will be reimbursed by the Scottish
Government into 2024/2025, and the Reserves will then be replenished.     
4.15. Council Tax / Council Tax Reduction Scheme (CTRS): There is a net over recovery
of Council Tax/CTRS of £3.262 million (sections 5.19 and 5.20).  The over recovery of
Council Tax mainly reflects levels of in-year collection from properties as well as
additional income in relation to arrears collection and empty properties. 
4.16. Summary and Proposals:  As noted in section 4.2, there is an overall underspend of
£9.000 million after Transfers to Reserves. 
4.17. It is proposed that £3.000 million be transferred to reserves and be used to fund
Budget pressures in 2024/2025.   
4.18. In addition, it is proposed that £6.000 million be transferred to reserves.  These monies
could be used in the Council’s Budget Strategy, bearing in mind the previously
identified savings requirement of £95.8 million across the 4 years from 2024/2025.   
4.19. Further details of the Probable Outturn position are provided in the remainder of the
report. 
5. 2023/2024 General Services Probable Outturn – Resources and Corporate Lines
5.1. Total Resource Position:  The outturn position, before any transfers to reserves, is
an underspend of £1.239 million. 
17

Page 18

5.2. Resources are proposing transfers to reserves totalling £1.750 million. These are
detailed in Appendix 2. Taking these transfers into account results in a net Resources’
overspend of £0.511 million. Details across Resources are shown in Table 2. 
Table 2: Resource Outturn 
Outturn
Before
Transfers to
Reserves
£m
Transfers to
Reserves 
£m
Outturn
After 
Transfers to
Reserves
£m 
over/
under
£m
Community and Enterprise 0.240 0.240 0.000 -
Education (0.295) 0.000 (0.295) over
Finance and Corporate (0.216) 0.000 (0.216) over
Housing and Technical 1.510 1.510 - -
Social Work – Delegated to IJB - - - -
Social Work – Non Delegated - - - -
Joint Boards - - - - 
1.239 1.750 (0.511) over 
5.3. Community and Enterprise Resources are showing a breakeven position after
Transfer to Reserves.  This includes a proposed transfer of the Community Led
Investment Monies (£0.200 million) which will spend in 2024/2025. 
5.4. The Education Resources’ overspend takes account of the financial impacts of periods
of industrial action throughout the year. 
5.5. The Finance and Corporate Resources’ overspend includes the anticipated overspend
on Empty Property Relief (paragraph 5.3 of the 2024/2025 Revenue Budget Update
and Savings report to Executive Committee, 22 November 2023). 
5.6. Housing and Technical Resources are showing a breakeven position after Transfers
to Reserves. 
5.7. The position for the Social Work Resources Adults and Older People includes a £1.272
million commitment in relation to the element of the budget delegated to the Integrated
Joint Board (IJB).  As this is an underspend on the Council’s contribution to the IJB,
this could have been retained by the Council, however, this assumed commitment
allows the IJB to retain this non-recurring underspend within their reserves earmarked
for future costs, in line with the approach to integrating health and social care budgets.
These monies will be retained in the Council’s Balance Sheet and will be available for
use by the IJB. 
5.8. The Social Work Resources non-delegated Services position is also breakeven.  This
includes Children and Families.  As reported previously, one-off funding totalling £9.2
million is being used in 2023/2024 to contribute towards the residual pressures of
residential placements and fostering and kinship care, some of which is a legacy from
the pandemic.  Ongoing actions on plans to manage the budget pressures are being
pursued by management for the remainder of 2023/2024.  In addition, the Resource
is working towards managing the overall budget pressure in Children and Families by
2024/2025. 
5.9. Loan Charges:  The loan charges budget outturn is showing an in-year underspend
of £9.456 million.  This is before transfers to Reserves of £9.258 million.  After these
proposed transfers, detailed in sections 5.10 and 5.11, the underspend is £0.198
million, and is attributed to higher than anticipated deposit interest.  
18

Page 19

5.10. As noted in the Service Concessions paper (Council, 18 January 2023), there is an
underspend anticipated in Loan Charges in the years from 2022/2023 to 2025/2026. 
These underspends will require to be set aside to manage anticipated overspends in
the years 2026/2027 to 2031/2032.  For 2023/2024, this totals £3.758 million and is
included in the proposed transfers in Appendix 2. 
5.11. The 2024/2025 Revenue Budget Update and Savings report to Executive Committee
(22 November 2023) noted that the Council are currently attracting high levels of
deposit interest on cash balances held. This is due to high interest rates being paid by
counterparties. There is also an anticipated underspend against borrowing costs
relating to the Transformation Fund for Leisure and Culture.  The estimated
underspend at that point totalled £5.5 million and was included in the Budget Update
paper presented to members in November 2023, and is included in the proposed
Transfers to Reserves. 
5.12. A breakdown of the Transfer to Reserves can be seen in Table 3.   
Table 3:  Loan Charges – Transfers to Reserves 
£m
Underspend to manage future anticipated overspends in Loan Charges
(section 5.10 and Council, 18 January 2023)
3.758
Underspend from Deposit Interest and Transformation Fund borrowing
2023/2024 (section 5.11 and Executive Committee, 22 November 2023)
5.500
Total Proposed Transfers to Reserves 9.258 
5.13. Corporate Items: The outturn position before proposed transfers to reserves of
£0.983 million (Appendix 2) is an underspend of £7.034 million.  After transfers, the
outturn is an underspend of £6.051 million. In the main, the underspend before
transfers relates to unbudgeted income from a historic VAT claim to HMRC (£4.878
million) (section 5.14), unrequired budget allocation for Waste/PPP costs (£0.766
million), lower than anticipated Non-Domestic Rates across the Council (£0.458
million), and a contingency budget (£0.400 million). 
5.14. Background to the VAT refund is that prior to 2009, various pieces of legislation were
legally challenged with regards to VAT, resulting in the Council being reimbursed
£1.633 million by HMRC in 2009/2010. Since then, there has been further legal
challenge which has been upheld, with the result being a further benefit to the Council
in 2023/2024 of £4.878 million.  The Council was advised of this on 11 December
2023. 
5.15. The Corporate Items position includes the impact of the Council funding its share of
the national pay award for Local Government employees, as per the national
agreement with the Scottish Government.  This totals circa £1 million and has been
met from Reserves in 2023/2024.  These will be reimbursed by the Scottish
Government into 2024/2025, and the Reserves will then be replenished.     
5.16. As noted, the position above is after the following proposed Transfers to Reserves
totalling £0.983 million: 
 Service Concessions – Impact of Accounting for PPP Transactions (£0.437
million):  As part of the new accounting arrangements, the Council took the
benefit of a recurring saving which averaged £4.000 million per annum.  The
actual value of the saving realised in 2023/2024 is £4.437 million, a benefit of
£0.437 million against the saving of £4.000 million. This is in line with the
19

Page 20

anticipated profile of the savings set out in the Service Concession paper (18
January 2023).  As the saving generated will be less than the £4.000 million in
some years, it is proposed that this benefit/underspend is transferred to Reserves
to be used to balance the saving over years 
 Insurance Fund (£0.300 million): The Insurance Fund will require additional
budget in 2024/2025 due to increased premiums and claim payments incurred. It
is proposed that £0.300 million is transferred to Reserves to fund these pressures 
 Central Energy Efficiency Fund (£0.246 million): Resources are allocated
funding from the Central Energy Efficiency Fund (CEEF) Reserve to pay for
spend to save projects.  When the savings are generated from the project in
future years, they repay the initial costs to the CEEF Reserve.  This over recovery
of income (£0.246 million) represents the repayment to be transferred to the
CEEF Reserve in 2023/2024 and is included in the proposed transfers to
reserves in Appendix 2. The position after this is breakeven 
5.17. 2023/2024 Investments – Transfer to Reserves: As part of the 2023/2024 budget
process, £7.747 million was made available for investments across the Council.  Of
this, £2.994 million had previously been earmarked to be transferred to Reserves for
use in future years, reflecting the timing profile of the spend across each initiative. 
After Transfers to Reserves, this leaves no variance on this budget line.   
5.18. All Resource spend against investment monies will continue to be monitored, with any
further Transfers to Reserves considered at year-end. 
5.19. Council Tax including Council Tax Reduction Scheme (CTRS):
The Net Council Tax / CTRS budget line is showing an over recovery of £3.262 million.
This is made up of an over recovery of Council Tax of £3.292 million offset by a CTRS
overspend of £0.030 million. 
5.20. The Council Tax over recovery of £3.292 million is due to: 
 Empty Properties (£0.215 million) – higher than anticipated income from empty
properties against a budget of £0.650 million
 Arrears (£0.607 million) – higher than anticipated arrears income against a
budget of £1.4 million
 Additional Properties (£2.176 million) – higher than anticipated income from
additional in year properties now contributing to Council Tax income
 Second Homes (£0.294 million) – higher than anticipated income from second
homes’ council tax payments against a budget of £0.500 million 
5.21.  Summary of Overall Outturn Position
Taking into account the position across the Budget areas as detailed in sections 5.1
to 5.20, the outturn position is an underspend of £9.000 million.   
5.22. It is proposed that £3.000 million be transferred to reserves and be used to fund
Budget pressures in 2024/2025.   
5.23. In addition, it is proposed that £6.000 million be transferred to reserves.  These monies
could be used in the Council’s Budget Strategy, bearing in mind the previously
identified savings requirement of £95.8 million across the 4 years from 2024/2025.   
20

Page 21

5.24. The full Probable Outturn is summarised in Table 4. 
Table 4: Summary of Overall Outturn Position  
£m
Position before Transfers: 
Resources Underspend (sections 5.1 – section 5.8) 1.239
Loan Charges Underspend (section 5.9 – 5.12) 9.456
Corporate Items Underspend (section 5.13 – section 5.16) 7.034
2023/2024 Investments – Transfers to Reserves (section 5.17) 2.994
Council Tax / CTRS Net Over Recovery (section 5.19 – 5.20) 3.262
Forecast Underspend Before Transfers to Reserves  23.985
Less: 
Proposed Transfers to Reserves (Appendix 2)  (14.985)
Forecast Underspend AFTER Transfers to Reserves 9.000
Less: 
Additional Proposed Transfers to Reserves (sections 5.22 - 5.23 and Appendix 2)
(9.000)
Breakeven Position AFTER Transfers to Reserves - 
5.25. Table 4 also shows the 2023/2024 Probable Outturn position of breakeven, after
transfers to Reserves. 
6. Redeterminations of 2023/2024 Revenue Grant Funding
6.1. The Local Government Finance Circular 8/2003 was published on 21 December 2023.
This circular confirmed previously advised monies for 2023/2024 and also some
additional earmarked funding for a number of Council services.  The bullets below
show the detail of the new redetermination monies. 
 2023/2024 Pay Award: £9.142 million has been provided to fund the 2023/2024
pay award to Council employees. This budget has been allocated across
Resources as appropriate. 
 2023/2024 Pay Award (Teachers): £10.080 million has been provided to fund
the 2023/2024 pay award to Teachers. This budget has been allocated to
Education Resources. 
 Ukraine Refugees: £1.485 million has been provided to fund continued support
to Ukrainian Refugee Resettlement and associated services. This budget has
been allocated to Housing and Technical Resources and included as a Transfer
to Reserves for use in future years (Appendix 2). 
 Teacher Induction Scheme: £2.306 million has been provided to fund the cost
of additional probationer teachers in 2023/2024. This budget has been allocated
to Education Resources. 
 Fostering and Kinship Care: £0.952 million provided to support the cost of
fostering and kinship in 2023/2024. This budget has been allocated to Social
Work Resources. 
6.2. The figures included in appendices 1 and 3 have been updated to reflect these monies.   
6.3. Teacher Numbers:  As previously reported, the Cabinet Secretary had held back
£45.5 million of funding nationally for the maintenance of Teacher Numbers, until after
the 2023 Census details are received by the Government, and until councils provide
assurance that they have maintained teacher numbers and pupil support numbers at
21

Page 22

the 2022 level.  For the Council, this amounts to £2.934 million.  The release of these
monies was not confirmed in the recent Finance Circular, however, on the basis that
the Council has maintained its Teacher Numbers, the amount of £2.934 million has
been assumed as being received.  Members will be advised if this is not the case.   
7. 2023/2024 General Services Monitoring Position  
7.1. Financial Position as at 1 December 2023 
As at 1 December 2023, the position on the General Services budget is a net
underspend of £0.593 million, after transfers to Reserves.  This is shown in Appendix
3. 
8. Housing Revenue Account Position
8.1. Financial Position as at 1 December 2023:  Appendix 4 of the report shows a
breakeven position against the phased budget on the Housing Revenue Account. 
8.2. Probable Outturn Position:  Appendix 4 also shows the forecast position for the
financial year, being a breakeven position for the Housing Revenue Account.   
8.3. This breakeven position includes a lower than budgeted Transfer from Reserves being
required in the financial year. It is assumed that the increased level of costs
experienced will be offset by an underspend in Loan Charges this financial year.   
8.4. The reduction in Loan Charges is anticipated in 2023/2024 as a result of utilising an
in-year benefit from the Housing Revenue Account Loans Fund Review.  This work
has been carried out and forms part of the 2024/2025 budget setting report for the
HRA to this Committee (Housing Revenue and Capital Account Budget 2024/2025). 
9. Employee Implications
9.1. None. 
10. Financial Implications
10.1. As detailed in sections 4 to 8 of the report. 
11. Climate Change, Sustainability and Environmental Implications
11.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
12. Other Implications
12.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. As detailed in section 4, inflationary and budget pressures this year
increase the risk of overspend, however, we have mitigated this going forwards
through providing additional funds in future years budget strategy, and through the
one-off use of reserves in the current year.   
12.2. We will also continue to monitor the actual impact through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the Probable
Outturn exercise included in this report ensures early warning for corrective action to
be taken where appropriate.  
12.3. There are no implications for sustainability in terms of the information contained in this
report. 
22

Page 23

13. Equality Impact Assessment and Consultation Arrangements
13.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
13.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Chief Executive 
10 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk  
23

Page 24

Appendix 1 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (BEFORE Transfers) 
Period Ended 1 December 2023 (No.9) 
Committee 
Annual
Budget 
Annual
Forecast
BEFORE
Transfers  
Annual
Forecast
Variance
BEFORE
Transfers 
Budget
Proportion
To 01/12/23 
Actual 
to 
Period 10
01/12/23 
Variance 
to
01/12/23 
Departments: £m £m £m  £m  £m  £m 
Community and Enterprise Resources 139.279 139.039 0.240  86.137  86.137  0.000  
Facilities, Waste and Grounds 83.200 82.873 0.327  52.467  52.035  0.432 under
Leisure and Culture Services 23.227 23.044 0.183  16.852  16.852  0.000  
Planning and Regulatory Services 5.382 5.018 0.364  3.612  3.491  0.121 under
Enterprise and Sustainable Development 5.973 5.664 0.309  1.709  1.548  0.161 under
Roads, Transportation and Fleet 21.497 22.440 (0.943)  11.497  12.211  (0.714) over
Education Resources 439.709 440.004 (0.295)  278.163  278.163  0.000  
Education 439.709 440.004 (0.295)  278.163  278.163  0.000  
Finance and Corporate Resources 44.104 44.320 (0.216)  35.497  35.497  0.000  
Finance Services - Strategy 2.306 2.272 0.034  2.407  2.371  0.036 under
Finance Services - Transactions 19.450 19.631 (0.181)  11.924  11.786  0.138 under
Audit and Compliance Services 0.411 0.417 (0.006)  0.397  0.412  (0.015) over
Information Technology Services 5.542 5.542 0.000  7.782  7.870  (0.088) over
Communications and Strategy Services 2.966 2.966 0.000  2.319  2.310  0.009 under
Administration and Licensing Services 4.510 4.730 (0.220)  3.457  3.623  (0.166) over
Personnel Services 8.919 8.762 0.157  7.211  7.125  0.086 under
Housing and Technical Resources 17.592 16.082 1.510  20.238  20.238  0.000  
Housing Services 10.229 8.673 1.556  6.329  6.281  0.048 under
Property Services 7.363 7.409 (0.046)  13.909  13.957  (0.048) over
Social Work Resources 239.322 239.322 0.000  141.048  140.957  0.091 under
Performance and Support Services 6.686 6.501 0.185  4.329  4.154  0.175 under
Children and Families 48.885 49.175 (0.290)  31.841  32.192  (0.351) over
Adults and Older People 182.252 182.252 0.000  103.459  103.343  0.116 under
Justice and Substance Misuse 1.499 1.394 0.105  1.419  1.268  0.151 under
Joint Boards 2.053 2.053 0.000  1.421  1.421  0.000             
882.059 880.820 1.239  562.504  562.413  0.091 under           
Committee 
Annual
Budget 
Annual
Forecast
BEFORE
Transfers  
Annual
Forecast
Variance
BEFORE
Transfers 
Budget
Proportion
To 01/12/23 
Actual 
to 
Period 10
01/12/23 
Variance 
to
01/12/23 
£m £m £m  £m  £m  £m 
Service Departments Total 882.059 880.820 1.239  562.504  562.413  0.091 under
CFCR 0.038 0.038 0.000  0.000  0.000  0.000 -
Loan Charges 38.796 29.340 9.456  0.000  0.000  0.000 -
Corporate Items (5.093) (12.127) 7.034  0.316  (0.186)  0.502 under
Corporate Items – 23/24 Strategy 0.000 0.000 0.000  0.000  0.000  0.000 -
Investments – 2023/24 (T/f to Reserves) 2.994 0.000 2.994  0.000  0.000  0.000 -           
Total Expenditure 918.794 898.071 20.723  562.820  562.227  0.593 under           
Council Tax 179.102 182.394 3.292  123.994  123.994  0.000 over
Less: Council Tax Reduction Scheme (23.278) (23.308) (0.030)  (16.116)  (16.116)  0.000 under
Net Council Tax 155.824 159.086 3.262  107.878  107.878  0.000 over
General Revenue Grant 350.757 350.757 0.000  242.832  242.832  0.000 -
Non-Domestic Rates 341.536 341.536 0.000  236.448  236.448  0.000 -
Transfer from Reserves 70.677 70.677 0.000  70.677  70.677  0.000 -
Total Income 918.794 922.056 3.262  657.835  657.835  0.000 -           
Net Expenditure / (Income)  0.000 (23.985) 23.985  (95.015)  (95.608)  0.593 under           
24

Page 25

Appendix 2
Proposed Transfers to Reserves included in the Probable Outturn 
Purpose / Description Resource  Value
£m
Resources  
Investment Monies
Investment monies allocated in 2023/2024 for Community Led Investments which will now
spend in 2024/2025.  
Community and
Enterprise
0.200
Fleet Sinking Fund
Annual contribution to the Fleet sinking fund to maintain asset replacement programme. 
Community and
Enterprise
0.025
Year 3 of Electric Vehicle Payback 
Ringfenced reserves used to manage purchase of electric vehicles in short term which have to
be repaid over the next few years. 
Community and
Enterprise
0.015
Total Community and Enterprise Resources   0.240
Ukraine Resettlement Funding
This funding forms part of the 2023/2024 revenue grant redeterminations and will be carried
forward for use in 2024/2025.
Housing and Technical 1.485
Local Heat and Energy Efficiency Strategies (LHEES) Funding
It is proposed that this external funding is carried forward to be utilised in 2024/2025.
Housing and Technical 0.025
Total Housing and Technical Resources  1.510
Total Resource Proposed Transfers to Reserves  1.750   
Loan Charges 
Loan Charges Underspend
Underspend to be set aside to manage future overspends predicted in Loan Charges as
previously advised to members (Council, 18 January 2023)
Loan Charges 3.758
Loan Charges Underspend
Underspend from Deposit Interest and Transformation Fund borrowing to be set aside as
included in the 2024/2025 Budget Strategy.  (Executive Committee, 22 November 2023)
Loan Charges 5.500
Total Loan Charges Proposed Transfers to Reserves   9.258   
Corporate Items  
Service Concessions
Underspend on Loan Charges used manage anticipated overspends in future years.
Corporate Items 0.437
Insurance Fund
The Insurance Fund will require additional budget into 2024/2025.
Corporate Items 0.300
Central Energy Efficiency Fund (CEEF)
Resources are allocated funding from the CEEF Reserve to pay for spend to save projects
which they repay over future years from the revenue savings generated by the project. This
transfer represents the payback of savings from Resources and allows the Reserve to be
regenerated for use on future projects.
Corporate Items 0.246
Total Corporate Items Proposed Transfers to Reserves   0.983   
Investments 2023/24 (T/f to Reserves)  
Front Line First – Facilities, Waste and Grounds
From the total investment of £3 million, £1.086 million has been retained for spend in
2023/2024 with the remaining £1.914 million to be transferred to reserves for use in future
years.  The £1.914 million has been moved to the budget line 2023/2024 Investments –
Transfers to Reserves and will be transferred to Reserves at the year-end. 
Investments 2023/24 (T/f
to Reserves)
1.914
Pre-School Clothing Grant
From the total investment of £1.350 million, an amount of £0.270 million has been retained for
spend in 2023/2024 with the remaining £1.080 million to be transferred to reserves for use in
the next 4 years.  The £1.080 million has been moved to the budget line 2023/2024
Investments – Transfers to Reserves and will be transferred to Reserves at the year-end. 
Investments 2023/24 (T/f
to Reserves)
1.080
Total Investments 2023/24 (T/f to Reserves)  2.994   
Total Proposed Transfers  14.985 
Additional Transfers to Reserves – Use of Outturn Underspend 
Budget Pressures
It is proposed that £3.000 million be transferred to reserves and be used to fund Budget
pressures into 2024/2025.  This proposal is to use this temporary funding to manage the timing
of when permanent budget solutions are identified / delivered.  
Use of Outturn
Underspend
3.000
Contribution to Budget Strategy
In addition, it is proposed that £6.000 million be transferred to reserves.  These monies could
be used in the Council’s Budget Strategy, bearing in mind the previously identified savings
requirement of £95.8 million across the 4 years from 2024/2025.   
Use of Outturn
Underspend
6.000
Total Additional Transfers to Reserves – Use of Outturn Underspend  9.000 
25

Page 26

Appendix 3 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (AFTER Transfers) 
Period Ended 1 December 2023 (No.9) 
Committee 
Annual
Budget 
Annual
Forecast
AFTER
Transfers  
Annual
Forecast
Variance
AFTER
Transfers 
Budget
Proportion
To 01/12/23 
Actual 
to 
Period 10
01/12/23 
Variance 
to
01/12/23 
Departments: £m £m £m  £m  £m  £m 
Community and Enterprise Resources 139.279 139.279 0.000  86.137  86.137  0.000  
Facilities, Waste and Grounds 83.200 82.873 0.327  52.467  52.035  0.432 under
Leisure and Culture Services 23.227 23.244 (0.017)  16.852  16.852  0.000  
Planning and Regulatory Services 5.382 5.018 0.364  3.612  3.491  0.121 under
Enterprise and Sustainable Development 5.973 5.664 0.309  1.709  1.548  0.161 under
Roads, Transportation and Fleet 21.497 22.480 (0.983)  11.497  12.211  (0.714) over
Education Resources 439.709 440.004 (0.295)  278.163  278.163  0.000  
Education 439.709 440.004 (0.295)  278.163  278.163  0.000  
Finance and Corporate Resources 44.104 44.320 (0.216)  35.497  35.497  0.000  
Finance Services - Strategy 2.306 2.272 0.034  2.407  2.371  0.036 under
Finance Services - Transactions 19.450 19.631 (0.181)  11.924  11.786  0.138 under
Audit and Compliance Services 0.411 0.417 (0.006)  0.397  0.412  (0.015) over
Information Technology Services 5.542 5.542 0.000  7.782  7.870  (0.088) over
Communications and Strategy Services 2.966 2.966 0.000  2.319  2.310  0.009 under
Administration and Licensing Services 4.510 4.730 (0.220)  3.457  3.623  (0.166) over
Personnel Services 8.919 8.762 0.157  7.211  7.125  0.086 under
Housing and Technical Resources 17.592 17.592 0.000  20.238  20.238  0.000  
Housing Services 10.229 10.158 0.071  6.329  6.281  0.048 under
Property Services 7.363 7.434 (0.071)  13.909  13.957  (0.048) over
Social Work Resources 239.322 239.322 0.000  141.048  140.957  0.091 under
Performance and Support Services 6.686 6.501 0.185  4.329  4.154  0.175 under
Children and Families 48.885 49.175 (0.290)  31.841  32.192  (0.351) over
Adults and Older People 182.252 182.252 0.000  103.459  103.343  0.116 under
Justice and Substance Misuse 1.499 1.394 0.105  1.419  1.268  0.151 under
Joint Boards 2.053 2.053 0.000  1.421  1.421  0.000             
882.059 882.570 (0.511)  562.504  562.413  0.091 under           
Committee 
Annual
Budget 
Annual
Forecast
AFTER
Transfers  
Annual
Forecast
Variance
AFTER
Transfers 
Budget
Proportion
To 01/12/23 
Actual 
to 
Period 10
01/12/23 
Variance 
to
01/12/23 
£m £m £m  £m  £m  £m 
Service Departments Total 882.059 882.570 (0.511)  562.504  562.413  0.091 under
CFCR 0.038 0.038 0.000  0.000  0.000  0.000 -
Loan Charges 38.796 38.598 0.198  0.000  0.000  0.000 -
Corporate Items (5.093) (11.144) 6.051  0.316  (0.186)  0.502 under
Corporate Items – 23/24 Strategy 0.000 0.000 0.000  0.000  0.000  0.000 -
Investments – 2023/24 (T/f to Reserves) 2.994 2.994 0.000  0.000  0.000  0.000 -
Total Expenditure 918.794 913.056 5.738  562.820  562.227  0.593 under           
Council Tax 179.102 182.394 3.292  123.994  123.994  0.000 over
Less: Council Tax Reduction Scheme (23.278) (23.308) (0.030)  (16.116)  (16.116)  0.000 over
Net Council Tax 155.824 159.086 3.262  107.878  107.878  0.000 -
General Revenue Grant 350.757 350.757 0.000  242.832  242.832  0.000 -
Non-Domestic Rates 341.536 341.536 0.000  236.448  236.448  0.000 -
Transfer from Reserves 70.677 70.677 0.000  70.677  70.677  0.000 -
Total Income 918.794 922.056 3.262  657.835  657.835  0.000 -           
Net Expenditure / (Income)  0.000 (9.000) 9.000  (95.015)  (95.608)  0.593 under           
26

Page 27

Appendix 4 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 1 December 2023 (No.9) 
Housing Revenue Account 
Annual
Budget 
Forecast 
for Year 
Annual
Forecast
Variance 
Budget
Proportion
to 01/12/23
Actual
to Period 9
01/12/23
Variance
to
01/12/23 
% Note 
£m £m £m  £m £m £m   
Employee Costs 15.310  15.401  (0.091)  10.015  10.054  (0.039) over (0.4%) 
Property Costs 50.929  56.610  (5.681)  29.002  32.968  (3.966) over (13.7%) 1
Supplies & Services 0.653  0.691  (0.038)  0.478  0.488  (0.010) over (2.1%) 
Transport & Plant 0.196  0.189  0.007   0.130  0.121  0.009  under 6.9% 
Administration Costs 5.570  5.597  (0.027)  0.363  0.378  (0.015) over (4.1%) 
Payments to Other Bodies 2.974  2.979  (0.005)  1.395  1.401  (0.006) over (0.4%) 
Payments to Contractors 0.100  0.145  (0.045)  0.062  0.062  0.000  - 0.0% 
Transfer Payments 0.000  0.000  0.000   0.000  0.000  0.000  - 0.0% 
Financing Charges 27.162  27.162  0.000   24.390  24.390  0.000  - 0.0% 
Total Controllable Expenditure 102.894  108.774  (5.880)  65.835  69.862  (4.027) over (6.1%) 
Total Controllable Income (115.940) (116.768) 0.828   (70.811) (71.086) 0.275  over
recovered 0.4% 2
Transfer to/(from) Balance Sheet (4.907) (0.853) (4.054)  (2.093) 0.000  (2.093) under
recovered (100.0%) 3
Net Controllable Expenditure (17.953) (8.846) (9.107)  (7.069) (1.224) (5.845) over (82.7%) 
Add: Non Controllable Budgets       
Financing Charges 17.953  8.846  9.107   5.584 0.000 5.845  under -100.0% 
Total Budget 0.000 0.000 0.000  (1.224) (1.224) 0.000  - 0.0% 
Variance Explanations
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor. There is also an overspend in relation
to cleaning charges.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.
3. The timing impact of the net overspend requires a higher than budgeted transfer from reserves at this time. 
Virements
None. 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 24 January 2024
Report by: Chief Executive 
Subject: Capital Budget 2023/2024 and Monitoring for Period 9 -
1 April 2023 to 1 December 2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2023 to 1
December 2023  
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-  
(1) that the adjustments to the General Fund Programme, listed at Appendix 1, be
approved; 
(2) that the period 9 position (ended 1 December 2023) of the General Fund Capital
Programme detailed in appendices 2 to 4 and the Housing Capital Programme
at Appendix 5, be noted; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 1 December 2023.  Spending has been split into two separate sections:- 
 General Fund Capital Programme including Education, Social Work, Roads and
Transportation and General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme 
4.1. 2023/2024 Budget:  The budget agreed at Executive Committee on 22 November
2023 was £78.901 million.  A revised programme of £71.696 million is now anticipated,
a reduction of £7.205 million from the previously approved position.   
4.2. This revised programme of £71.696 million reflects proposed adjustments to the
programme, totalling a net decrease of £1.140 million, which are detailed in Appendix
1.     
4.3. These adjustments reflect a delay in the Vacant and Derelict Land funded project at
Langlands West Industrial Development Site, East Kilbride as the remediation works 
4
29

Page 30

at the site are unable to commence until the contractor at Greenhills Road has finalised
their outstanding works (£0.500 million) and the community-led project at Carluke High
Mill Community Facility (£0.501 million), where the delay in receiving Regeneration
Capital Grant funding has impacted project timescales.  Finally, due to project
timescales, both the Community Bus Fund grant (£0.303 million) and SPT funding on
Lanark Interchange cannot be utilised this financial year.  The Community Bus Fund
grant will be utilised in 2024/2025 instead.   
4.4. The decrease in the programme above is partially offset by budget increases with
developer’s contributions identified to implement infrastructure improvements at
Calderglen Country Park, East Kilbride (£0.043m), additional funding received from
Cycling Scotland for cycle shelters at schools (£0.095m) and the Shared Prosperity
Fund (£0.026m) for energy efficiency investment in business infrastructure.   
4.5. A further proposed exception on the Glasgow City Region City Deal – Greenhills Road
project is included in a separate report to this Committee for members’ consideration. 
If this exception is approved, the Capital Programme will be updated as part of the
next capital budget monitoring update to this Committee.   
4.6. Transfers to Revenue:  In addition to the adjustments noted at Sections 4.2 and 4.3,
the revised programme of £71.696 million also reflects a transfer to revenue of £1
million for the Private Housing Scheme of Assistance project.  The original capital
budget for 2023/2024 included an allocation of £1.000 million for Private Housing
Scheme of Assistance.  Following a review of the spend, it has been identified that it
cannot be classed as Capital.  Therefore, it is proposed that budget of £1.000 million
will be transferred to Housing and Technical Resource’s Revenue budget.   
4.7. Capital expenditure can be funded by Revenue monies, however, Revenue spend
cannot be paid for from Capital funding.  The Council’s Capital programme includes
funding that can be used for Revenue spend, such as contributions from the Revenue
budget.  We are, therefore, able to move funding between the Capital and Revenue
Programmes and deliver the project as planned.  This is an accounting transaction
only. 
4.8. Since the last report to this Committee, there has also been a change to the funding
package, and this is detailed in sections 4.9 and 4.10. 
4.9. General Capital Grant: In December 2023, the Scottish Government revised our
2023/2024 General Capital Grant allocation to £29.947 million.  This is a decrease of
£4.883 million and reflects the removal of the previously expected 2023/2024 Free
School Meals allocation of £5.065 million.  The Capital Programme had originally
included a 2023/2024 allocation of £5.065 million for this project, based on information
received from the Scottish Government.  However, no Capital funds have been
distributed to the Council this year for free school meals.  It has, therefore, been
removed from the Programme.   
4.10. This grant reduction has been offset by an increase of £0.182 million in the overall
general Capital Grant allocation.  Given the late notification of this additional funding,
this additional allocation of £0.182 million will be used to fund the existing Capital
Programme and reduce the Council’s level of borrowing in 2023/2024. The overall
benefit of this additional funding will be considered as part of the 2024/2025 Capital
Programme report.   
4.11. The revised Programme, including the movement from the last report, is detailed in
Appendix 2.
30

Page 31

4.12. Programmed funding for the year also totals £71.696 million.  The funding available to
support the overall 2023/2024 Capital Programme is detailed in Appendix 3.     
4.13. 2023/2024 Outturn:  Work has been ongoing to clarify the predicted spend position
for the General Services Capital Programme for this financial year and this is detailed
in sections 4.14 to 4.16.   
4.14. Current estimates from Resources suggest an outturn of around £65.4 million.  Against
the revised budget of £71.696 million, this outturn means a net underspend across
Resources of £6.3 million.  This is made up of project underspends totalling £8.5
million offset by projects with greater than anticipated spend of £2.2 million.   
4.15. The majority of the variance is due to the timing of spend, resulting in budget required
in 2024/2025 rather than 2023/2024.  The progression of a number of projects has
been impacted by protracted negotiations with external organisations (primarily the
Place Based Investment Programme and Rural Development Centre projects).  As a
result, confirmation of final outturn figures is awaited.  For some other projects
(Prioritised Urgent Investment), the spend is demand led and final levels of spend will
only be determined as we approach the end of the year and all commitments have
been identified.   
4.16. These underspends have been partially offset by a few projects where there are
budget overspends predicted this financial year.  For these projects, again, this is a
timing issue only with funding for the overall spend already identified into the next
financial year.   
4.17. A list of the main projects which are responsible for the underspend of £6.3 million and
which will now complete in 2024/2025 is included in Appendix 4.   
4.18. General Fund – Period 9 Position:  As noted in section 4.1, the total capital spending
programme for the year is £71.696 million.   
4.19. Appendix 3 shows budget for the period of £31.992 million and spend to the 1
December 2023 of £31.999 million.  The spend is, therefore, slightly ahead of
programme by £0.007 million and this mainly reflects the timing of project spend in
relation to the adaptation works at Uddingston Grammar School (£0.442 million),
where the funding requirement for this project had originally been anticipated for
2024/2025.  This overspend has been partially offset by an underspend on the First
Steps Community Nursery Extension, Hamilton project (£0.129 million) due to the
timing of spend.  It has also been partially offset by project spend on the Prioritised
Urgent Investment Programme (£0.239 million) within Housing and Technical
Resources, being less than anticipated at this time.       
4.20. Actual funding received to 1 December 2023 is £53.928 million.  This is also detailed
in Appendix 3. 
4.21.   Relevant officers will continue to closely monitor the generation of all income. 
5. Housing Capital Programme
5.1. 2023/24 Budget:  Appendix 5 summarises the position on the Housing programme as
at 1 December 2023.  The revised capital programme for the year is £67.443 million,
as approved by the Executive Committee on 22 November 2023. 
31

Page 32

5.2. Programmed funding for the year also totals £67.443 million.  The funding sources are
detailed in Appendix 5. 
5.3. 2023/2024 Outturn:  Current estimates from Housing and Technical Resources
suggest an outturn of £67.443 million.  Progress on the Housing Capital Programme
will continue to be monitored and updates will be provided to future meetings of this
Committee. 
5.4. Period 9 Position:  Budget for the period is £33.315 million and spend to 1 December
2023 amounts to £33.973 million.  This results in the Housing Programme being
£0.658 million ahead of programme.  This is due to the number of buy backs, through
the open market purchase scheme, which have been progressed earlier than
anticipated.   
5.5. As at 1 December 2023, £33.973 million of funding had been received. 
5.5 Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee. 
6. Employee Implications
6.1. There are no employee implications as a result of this report.  
7. Financial Implications
7.1. The General Services and Housing Programme Programmes and their spend position
to 1 December 2023 are detailed in sections 4 and 5 respectively. 
7.2. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to this Committee. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment is
required. 
10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
10 January 2024 
32

Page 33

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 22 November 2023 
List of Background Papers
 Capital Ledger prints to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
33

Page 34

Appendix 1
Proposed Adjustments  
Community and Enterprise Resources 
Calderglen Country Park – One Way System & Improved Infrastructure
Approval is sought to increase the 2023/2024 Capital Programme by £0.043 million
to upgrade and enhance the road infrastructure within Calderglen Country Park. 
This includes the introduction of a one-way traffic management system and
improvements to the existing road infrastructure which will resolve ongoing flooding
and parking issues. 
This will be funded by developers’ contributions already received from the East
Kilbride area. 
£0.043m
SLC Industrial Infrastructure - Energy Efficiency 
As reported to the Community and Enterprise Committee (29 August 2023), to
facilitate energy efficiency investment in business infrastructure, an allocation of
£0.909 million has been made available from the Council’s Shared Prosperity Fund
allocation.  Feasibility work on Cathcart Place Industrial Development will
commence during 2023/2024, with the main improvement works scheduled to start
in 2024/2025.   
Approval is sought to increase the 2023/2024 Capital Programme by £0.026 million,
with the remaining £0.883 million being added to the budget in 2024/2025 when
required.     
£0.026m 
Vacant and Derelict Land – Langlands West Strategic Industrial Development Site,
East Kilbride
The 2023/2024 Capital Programme includes £0.500 million for improvement works
at Langlands West, which would commence following the completion of the City
Deal funded project at Greenhills Road. 
Reinstatement works to the area used as a contractor’s site are still ongoing.  The
remediation works cannot start until this has been concluded.   
Approval is sought to slip £0.500 million into financial year 2024/2025 to reflect the
revised timescales.   
(£0.500m)
Carluke High Mill Community Facility – Phase 1
This funding of £1.199 million (£0.714m in 2023/2024, £0.485m in 2024/2025) was
secured from the Scottish Government’s Regeneration Capital Grant Fund (RCGF)
towards the community-led project to refurbish and repurpose Carluke High Mill into
a multi-purpose community facility.  The community group have also been awarded
Heritage Lottery and Historic Environment Scotland funding for this project.   
Following a delay in the award of Regeneration Capital Grant funding, along with a
slight delay in the main contract being agreed, the Community Group have now
advised that the project timescales have been reviewed and anticipated spend in
2023/2024 is now expected to be £0.213 million, with the balance of £0.986 million
required in financial year 2024/2025.  Therefore, approval is sought to slip £0.501
million into financial year 2024/2025 to reflect the revised timescales.   
(£0.501m) 
34

Page 35

Cycle Shelters at Schools 
Cycling Scotland has provided specific grant funding of up to £0.095 million in
financial year 2023/2024 for the supply and installation of cycle and scooter parking
facilities at the following establishments:  St Mark’s Primary School, Hamilton;
Newton Farm Primary School, Woodpark Primary School, Muiredge Primary
School, Hunter Primary School, Netherburn Primary School and Duncanrig
Secondary School.  
Approval is sought to increase the 2023/2024 Capital Programme by £0.095 million.    £0.095m 
Community Bus Fund
The Scottish Government have provided specific grant funding of £0.303 million to
improve connectivity, integration between modes, or innovative transport solutions
in rural areas of deprivation.  This funding will be combined with grant funding
awarded by Strathclyde Partnership for Transport (SPT) to redevelop Lanark
Interchange. 
The project is currently being tendered and will be awarded early in 2024, with
works continuing into financial year 2024/2025.  Community and Enterprise
Resources have, therefore, confirmed that they are unable to spend both of the
Community Bus Funds and SPT funding streams this financial year.  The SPT
funding will be maximised in 2023/2024 with the funding from the Community Bus
Fund utilised in 2024/2025.  Approval is sought to slip £0.303 million into financial
year 2024/2025 to reflect the revised timescales.    (£0.303m)
Minor Adjustments -    
TOTAL ADJUSTMENTS  (£1.140m) 
35

Page 36

Appendix 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 1 DECEMBER 2023 
£m  
Total Base Budget (including carry forward from 2022/2023) 78.901  
Proposed Adjustments – Period 9 (Sections 4.3 – 4.4 & Appendix 1) (1.140)  
Transfer to Revenue (Sections 4.6 - 4.8) (1.000)  
Free School Meals (Section 4.9) (5.065)  
Total Revised Budget 71.696     
2023/24
Budget 
Period 9
Proposed
Adjustments 
Revised
2023/24
Budget
Resource £m £m £m    
Community & Enterprise 39.717 (1.140) 38.577
Education 19.333 (5.065) 14.268
Finance & Corporate 5.333 - 5.333
Housing & Technical 12.488 (1.000) 11.488
Social Work 2.030 - 2.030
Other Match Funding - - -    
TOTAL CAPITAL PROGRAMME 78.901 (7.205) 71.696      
36

Page 37

Appendix 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 1 DECEMBER 2023 
2023/24
Original
Estimate inc
C/F 
2023/24
Revised
Budget 
2023/24
Budget to
01/12/23 
2023/24
Actual to
01/12/23     
Expenditure £m £m £m £m     
General Fund Programme 77.849 71.696 31.992 31.999 
Income
2023/24
Budget
2023/24
Revised
Budget 
2023/24
Actual
To
01/12/23         
£m         £m  £m
Prudential Borrowing 24.959  25.776  25.776
Developers Contributions 7.658 0.949  0.000
Partners (Including SPT, Clyde Windfarm
and Transport Scotland)
2.157 3.764  0.634
Scottish Government:     
- Capital Grant 33.985 29.947  20.126 
- Cycling, Walking and Safer
Routes
1.632 2.284  0.704
- Road Safety Improvement 0.000 0.475  0.000 
- Vacant and Derelict Land 2.019 1.519  1.519 
- Regeneration Capital Grant  0.737 1.225  0.745 
- Place Based Investment
Programme
1.510 2.723  2.723
-Inspiring School Age Childcare
Spaces Programme
0.000 0.234  0.000
Glasgow City Region City Deal 0.000 0.000  0.000
Capital Receipts 2.000 1.340  0.241
Specific Reserves 1.192 1.422  1.422
Revenue Contribution 0.000 0.038  0.038     
TOTAL FUNDING 77.849 71.696  53.928 
37

Page 38

Appendix 4
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/2024
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 1 DECEMBER 2023 
Projects with Anticipated Underspends in 2023/2024, which will carry forward into
2024/2025
Project Name Project Type Completion Date   
Community and Enterprise
Resources  
Phillipshill Cemetery - Extension Infrastructure May 2024
Play Parks - Various Infrastructure Throughout 2024/25 and
beyond
White Bridge Replacement,
Chatelherault Country Park - Design 
Infrastructure April 2024
Larkhall Leisure Centre - Design New Build January 2025
TACT Hall – Heating Replacement Refurbishment May 2024
Priory Changing Pavilion, Blantyre Refurbishment September 2024
Rural Development Centre - Lanark New Build September 2024
2023/2024 Place Based Investment
Programme - Various
Regeneration September 2024
Vacant & Derelict Land - Cuningar
Allotments
Regeneration May 2024
City Deal Community Growth Areas -
Woodfoot Road / Wellhall Road,
Hamilton
Infrastructure March 2025
Lanark Interchange Infrastructure July 2024   
Education Resources  
Woodside Primary School -
Adaptations
Adaptations August 2024
Uddingston Nursery Expansion Adaptations August 2024
Crawforddyke Primary School - Toilet
Adaptations
Adaptations April 2024
Wooddean Early Learning Centre
(formerly Clyde Terrace Nursery)  
New Build May 2024
Free School Meals Expansion Adaptations Throughout 2024/25 and
beyond
Education ICT (current contract) Infrastructure  October 2024   
Finance and Corporate Resources  
IT Infrastructure Infrastructure Throughout 2024/25   
Housing and Technical Resources   
Prioritised Urgent Investment Refurbishment Throughout 2024/25
Lifecycle Replacement Schools Refurbishment Throughout 2024/25
Communities Facilities Fund Refurbishment Throughout 2024/25
Council Offices – Brandon Gate Adaptations June 2024
CEEF 2023/24 Programme Refurbishment June 2024
38

Page 39

Appendix 5
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/2024
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 1 DECEMBER 2023 
2023/24
Original 
Budget  
2023/24
Revised
Budget
2023/24
Budget to
01/12/23
2023/24 
Actual to
01/12/23 
£m £m £m £m
Expenditure 
2023/2024 Budget  63.916  67.443  33.315  33.973     
2023/24
Original 
Budget  
2023/24
Revised
Budget 
2023/24
Actual to
01/12/23 
£m £m  £m
Income         
Capital Receipts 0.000 1.683  1.901
Capital Receipts – Land Sales 0.000 0.000  0.018
Capital Funded from Current Revenue 27.162 27.162  24.385
Prudential Borrowing 17.302 23.166  0.000
Scottish Government Specific Grant:    
- New Build 16.632 10.048  7.538
- Open Market Purchase Scheme 2.700 5.264  0.000
- Mortgage to Rent 0.120 0.120  0.131 
63.916 67.443  33.973 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Chief Executive 
Subject: Additional Funding from Scottish Government and
Other External Sources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (22 November 2023)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the additional funding totalling £24.003 million, detailed in Appendix 1 and 2,
be noted. 
3. Background
3.1. The Council is periodically advised of additional funding which is made available from
the Scottish Government and other sources to enable various initiatives to be
undertaken. 
3.2. Additional funding may either be paid through the General Revenue / Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding are attached in Appendix 1 and 2 of the report.  The
report details additional funding that has been reported by Resources as part of the
additional resources notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £23.726 million has been identified for 2023/2024. Of
this, £22.592 million is a result of the redeterminations noted in the recent Local
Government Settlement. This is detailed in Appendix 1.   
5.2. Additional Capital funding of £0.277 million has been identified for 2023/2024. Of this,
£0.182 million is, again, the result of the redeterminations noted in the recent Local
Government Settlement. This is detailed in Appendix 2.  
5
41

Page 42

5.3. The total additional funding is, therefore, £24.003 million and Resource budgets will
be updated to reflect this additional funding as required. Where appropriate, details of
spending plans will be presented to Resource Committees for approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Chief Executive 
5 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 22 November 2024 
List of Background Papers
 Additional Funding Reports 23 October 2023 to 5 January 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
42

Page 43

Appendix 1 
Additional Revenue Funding 
Resource  Description  2023/2024
£m 
2024/2025
£m 
Total
£m 
Method
Education Scottish Milk and Healthy Snack Scheme 
To provide as many eligible children as
possible who are attending regulated pre-
school day care settings for 2 hours or
more to receive milk (or an approved
alternative) and a healthy snack, and to be
acquiring healthy eating habits for the
future. 
1.134 - 1.134 Scottish
Government
Various Local Government Redeterminations: 
• Local Government Pay Award (ALL)
• Teachers Pay Award (EDR)
• Ukraine Refugee Resettlement (HTR)
(In addition to the £1.373m previously
notified to Executive Committee,
October 2023)
• Fostering and Kinship Care (SWR)
• Teacher Induction Scheme (EDR) 
9.142
10.080
0.112 
0.952
2.306
22.592  -  22.592
Scottish
Government –
General
Revenue
Grant 
TOTAL REVENUE FUNDING 23.726 - 23.726 
43

Page 44

Appendix 2 
Additional Capital Funding 
Resource  Description  2023/2024
£m 
2024/2025
£m 
Total
£m 
Method
Community and
Enterprise
Cycling Scotland - Cycle and Scooter
Parking at Schools 
For provision and installation of cycle
shelters at 4 schools, and the upgrading
of existing panels at a further 3 schools.
0.095 - 0.095 Cycling
Scotland
General Local Government Redeterminations: 
• General Capital Grant  0.182  -  0.182
Scottish
Government 
TOTAL CAPITAL FUNDING 0.277 - 0.277 
44

Page 45

Report 
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Chief Executive 
Subject: Recommendations Referred by Finance and Corporate
Resources Committee – Non-Domestic Rates – Empty
Property Relief Policy 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the undernoted recommendation referred to this Committee
by the Finance and Corporate Resources Committee of 6 December 2023.
purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the revised Empty Property Relief (EPR) Policy be approved and adopted
by the Council from 1 April 2024.
[1recs]
3. Background
3.1 Recommendation Referred by Finance and Corporate Resources Committee of
6 December 2023 – Non-Domestic Rates - Empty Property Relief Policy–
Extract of Minute 
A report dated 17 November 2023 by the Executive Director (Finance and Corporate
Resources) was submitted on the proposed changes to the Council’s Non-Domestic
Rates Empty Property Relief (EPR) policy. 
Non-domestic rates are a tax on non-domestic properties to help fund essential
council services.  EPR provided certain rates relief on unoccupied non-domestic
properties and, prior to 2023, the scheme was operated at a national level, which
was mandatory and fully funded by the Scottish Government through the Local
Government Financial Settlement. 
EPR was devolved from the Scottish Government to local authorities from 1 April
2023, following the repeal of Section 24 of the Local Government (Scotland) Act
1966.  This included the transfer of £105 million annually across all councils, fixed
until the next revaluation in 2026.  The Council’s annual allocation from 2023/2024
onwards was £2.183 million.  Each council now had autonomy to design their own
scheme to best meet their needs. 
On 1 March 2023, the Executive Committee had approved the Council’s policy on
EPR for implementation from 1 April 2023.  The policy mirrored the previous
legislation due to the short time frame given to consider potential changes and
uncertainty of the impacts of the 2023 non-domestic rates revaluation.  A
6
45

Page 46

commitment was given to review the policy and report back to the Finance and
Corporate Resources Committee during 2023/2024 with any proposed changes to
the policy. 
The current criteria for awarding EPR was detailed in the report.  Recent analysis
highlighted that there were currently 478 empty properties in South Lanarkshire, with
the Council being the ratepayer for 98 of those properties.  Of the current empty
properties, 347 (73%) had been empty for more than 12 months, with 61 belonging
to the Council. 
EPR of £1.721 million had been awarded in 2022/2023.  The current projection for
2023/2024 was £2.820 million, which represented a significant overspend on the
budget of £2.183 million due to East Kilbride Shopping Centre entering
administration in November 2022.  Any overspend would require to be funded by the
Council, although discussions had commenced with COSLA and the Scottish
Government regarding any scope for additional funding to mitigate the financial
impact of this. 
It was proposed that the Council revise the EPR policy to promote the occupation of
empty properties and deliver the economic and social benefits in South Lanarkshire
as well as to reduce the cost to the Council during a period of significant financial
pressure. 
Re-occupation of properties would stimulate economic growth and provide improved
employment opportunities, increased spend in local business and a decreased risk
of vandalism and anti-social behaviour.  The proposed policy also looked to address
issues of equity within the existing system by continuing to provide relief to empty
property ratepayers but incentivising re-occupation by ending open ended
exemptions and reliefs for most empty properties, with a 12 month time limit placed
on any such award instead. 
The proposed policy also removed the favourable empty relief terms offered to
industrial categorised properties.  They would now receive the same EPR as
commercial properties, restricted for 12 months.  It also proposed that the 100%
indefinite relief currently provided to listed buildings be replaced with 50% relief in
the first 3 months, followed by 10% relief for 9 months.  This would align with the
proposed relief for commercial industrial properties and incentivise owners of listed
buildings to bring them back into use. 
The duty on business owners to apply for relief timeously and ensure they received
accurate bills was also reflected in the new policy.  It was proposed that backdating
EPR be restricted to the current financial year as opposed to the current policy,
where backdating could be awarded up to the preceding 6 financial years. 
Implementation of the new policy would commence from 1 April 2024 for all empty
properties.  For existing ratepayers affected by the policy change, entitlement would
be dependent on how long the property had been empty. 
It was proposed that a full review of the new policy be undertaken in 2027/2028 but
would be carried out sooner if required. 
A comparison of the proposed EPR policy with the existing policy, including the
justification for the proposed changes, was detailed in Appendix 1 to the report, with
the full policy attached at Appendix 3. 
46

Page 47

The Committee
recommended to the
Executive Committee:
that the revised EPR Policy, to be adopted by the
Council from 1 April 2024, as outlined at section 5 of
the report and detailed in Appendix 3 to the report,
be approved. 
3.2 A link to the report submitted to the Finance and Corporate Resources Committee of
6 December 2023 is provided here for information.  
4. Employee Implications
4.1. All employee implications were highlighted as part of the original report to the
Resource Committee. 
5. Financial Implications
5.1. All financial implications were highlighted as part of the original report to the
Resource Committee. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. Any risks or other implications were highlighted as part of the original report to the
Resource Committee. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. Equality impact assessment and consultation arrangements were highlighted as part
of the original report to the Resource Committee. 
Paul Manning
Chief Executive 
3 January 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
♦ Finance and Corporate Resources Committee of 6 December 2023 (Paragraph 10) 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Pauline MacRae, Administration Adviser
Ext: 4108  (Tel: 01698 454108)
E-mail:  Pauline.macrae@southlanarkshire.gov.uk
47

Page 48

48

Page 49

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Land and Property Transfers and Disposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Executive Committee of the actions required in respect of land and
property transactions.
1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that land and property identified in Appendix A be reallocated as detailed. 
(2) that the land detailed in Appendix B, which will be the subject of negotiated
transactions, be declared surplus to Council requirements.
[1recs]
3. Background
3.1. Details of land and property, which is potentially suitable for redevelopment or
disposal, are circulated to all Resources and Community Planning Partners to
establish if they are suitable for alternative operational use. 
3.2. Recommendations are made following the consideration of planning, title and other
legal constraints.  Any assets with competing interests are judged against Council
priorities, including the need for capital receipts, prior to a recommendation being
made. 
3.3. Transactions out with the Property Bulletin process, where there is a requirement to
reallocate or declare property surplus as part of minor/adjoining sales, or to facilitate
a Council project, are not circulated through the Property Bulletin, however, the
details are included in this report. 
3.4. Transactions are only included in the report after successful consultation with the
holding Resource(s) and Planning. 
4. Property Transactions
4.1. Appendix A details three sites for which Housing Services have undertaken an initial
development assessment.  In relation to the former Early Learning Unit, Carlisle
Road, Hamilton, and the surplus land at Priory Avenue, Lesmahagow, they have
requested that these sites be transferred from the Education Account and the
Corporate Land Bank respectively to the Housing Revenue Account (HRA) for
inclusion in the New Council Housing Programme.   
7
49

Page 50

4.2  The Nisbet Centre, Raploch Street, Larkhall is closed and now surplus to the
requirement of Social Work Resources. It is adjacent to the site of the former
McWhirter residential home which has already been transferred to the Housing
Revenue account and is the subject of a proposed development of Council Housing.
Housing have carried out an initial assessment and have confirmed that this site
would allow additional units and regularisation of the development site and it is
suitable for transfer. The site is also detailed in Appendix A 
5. Non Bulletin Disposals
5.1. Appendix B details negotiated transactions where the land requires to be declared
surplus in order that Property Services can conclude negotiations for its disposal. 
6.  Employee Implications
6.1. There are no employee implications. 
7. Financial Implications
7.1. Capital receipts for both General Services and Housing Revenue Accounts will be
secured through the disposals identified in this report. 
8 Climate Change, Sustainability and Environmental Implications
8.1 There are no climate change, sustainability or environmental implications as a result
of this report. 
9. Other Implications
9.1. There is a low risk that the capital receipts anticipated, as a result of declaring these
properties surplus, may not be realised if, for reasons out with the Council’s control,
the purchasers choose not to proceed with the transactions.  However, the
procedures and consultations described in Sections 3 and 10 of this report have
been implemented to minimise this risk. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required.   
10.2. Consultation was undertaken with all Resources through the Property Bulletin.  In
addition, Planning, Roads, Legal, and Housing Services were consulted through the
Area Property Groups. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
15 December 2023 
Link(s) to Council Values/Priorities/Outcomes
 Achieve efficient and effective use of resources. 
List of Background Papers
 Plans of the land and property referred to in this report. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- Gerry McParland, Property Services Manager (Assets and Estates)
Ext: 5177  (Tel: 01698 455177)  E-mail:  gerry.mcparland@southlanarkshire.gov.uk
50

Page 51

BULLETIN TRANSFERS
APPENDIX A 
Area Description Previous
Account
New
Holding
Account
Transfer Value
Band
4,797 sq
m 
Former Early Learning Unit,
Carlisle Road, Hamilton 
Education Housing
Revenue
Immediate 2
7,300 sq
m
Priory Avenue Lesmahagow  Education Housing
Revenue
Immediate 3
1,065 sq
m
Former Nisbet Centre, Raploch
Street, Larkhall
Social
Work
Housing
Revenue
Immediate 4 
APPENDIX B 
NON BULLETIN DISPOSALS 
Area  Description Holding
Account
Proposal Value
Band
280 sq m Annabella Road, Netherburn Housing Access for
residential
development
4
70 sq m 15 Broomhill Gate, Larkhall Community
&
Enterprise
Garden Ground 4
250 sq m 26 Westbarns Road, Strathaven Education  Garden
Ground/House Plot
4
188 sq m 1 Blacklands Road, East Kilbride Community
&
Enterprise
Garden Ground 4 
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Chief Executive  
Subject: Update on the Budget Strategy for 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to: 
 provide members with an update on the Budget position for 2024/2025, including
the impact of the Local Government Settlement 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the update to the Budget Strategy, including the update on the Settlement
for the Council, resulting in a revised Budget Gap of £20.570 million (section
5.11), be noted; 
(2) that the position in relation to Council Tax (section 6), be noted;
(3) that the update in relation to Capital Grant allocations for 2024/2025 (section 7),
be noted;
(4) that the summary of the Council’s 2023/2024 Probable Outturn (section 8), be
noted; and 
(5) that the Timetable detailed in section 10, be noted. 
3. Background
3.1. A report titled 2024/2025 Revenue Budget Update and Savings Proposals was
presented to the Executive Committee on 22 November 2023.  That report gave an
update on the previous report to Council (June 2023) and detailed a revised Budget
Gap of £20.7 million.  This was the same position noted in the presentation to members
on the 2024/2025 Budget (9 November 2023). 
3.2. On Thursday 21 December 2023, the Council received its grant settlement for
Revenue and Capital (the Local Government Settlement).  This will impact on the
Budget Strategy for 2024/2025. 
3.3. This report will, therefore, provide an updated position to Council, and will focus on the
following: 
 Recap of the 2024/2025 Revenue Budget Update Paper, 22 November 2023
(section 4)
 Local Government Settlement – Impact on Revenue Budget Strategy (section 5),
 Council Tax (section 6)
 Local Government Settlement – General Capital Grant Position (section 7)
 2023/2024 Probable Outturn (section 8)
 Summary (section 9)
8
53

Page 54

 Timetable and Next Steps (section 10) 
4. 2024/2025 Revenue Budget Update Paper (22 November 2023) 
4.1. The report and the presentation to members in November noted a revised Budget Gap
of £20.7 million.  This included the use of reduced Pension Contributions and an
estimate of underspends likely to arise from the 2023/2024 Probable Outturn. 
4.2. The report also illustrated that over the next 4 years, the savings that the Council
requires are estimated at approximately £96 million.  By using these solutions including
the Pension Contributions and the 2023/2024 Underspends, the level of savings does
not reduce, but using the temporary funding over the 4-year period does allow
consideration of the timing of those savings.  This was shown in Appendix 1 of the
November Update paper and is re-presented in Appendix 1 of this report.    
4.3. The November 2023 paper also included savings proposals for members’
consideration. The savings identified currently total £18.589 million.  This total includes
Management and Operational Savings of £3.300 million along with Resource savings
proposals of £15.289 million. 
5. Local Government Settlement – Impact on Revenue Budget Strategy 
5.1. The Council received the Local Government Settlement on 21 December 2023.  This
formally details our grant allocations for 2024/2025.  While the Settlement is still under
review and further updates may be received which change the Council’s position, it is
the best information available at this point.   
5.2. As a result of changes in funding formula, in part because of increases in the South
Lanarkshire population relative to that of other council areas, the Council should have
seen the benefit of increased funding from distribution formula across a number of
budget lines.  This would have been in line with the way grant is distributed to councils
and would have assisted with increased costs from demand for services arising from
an increase in population.  This aspect would have seen the Council’s grant increase.     
5.3. However, a general national cut to Local Government funding is noted as £62.7 million
(indicated in the CoSLA Budget Reality statement issued to members on 22 December
2023).  The Council’s share of the national cut (£3.6 million) means that nearly all of
the benefit from changes in funding formula is wiped out.   
5.4. On a like for like basis, the movement in grant into 2024/2025 is a reduction of £0.250
million. 
5.5. As part of the Council’s 2024/2025 Budget Strategy, a grant reduction of £0.880 million
had been assumed.  Members will recall that this related to the impact of an increase
in income from Council Tax (Executive Committee, June 2023).  Therefore, an actual,
like for like cut of £0.250 million represents a movement in the Budget Gap of £0.630
million.  There is still a period of time where changes to the Settlement are possible,
and, therefore, the figure could change. 
Impact on the 2024/2025 Budget Gap: (£0.630 million) 
5.6. Rates Poundage:  The Settlement also advised of a larger than budgeted movement
in rates poundage.  The 2024/2025 Budget Strategy included a rates budget increase
of £0.460 million. This reflected an estimated increase of around 1.6% on the
2023/2024 rates bill. This was the equivalent increase experienced into 2022/2023
(there was no poundage increase into 2023/2024 due to the rates revaluation). 
54

Page 55

5.7. The 2024/2025 Settlement shows no change in the Basic Rates Poundage (properties
below £50,001), however, for properties over that value, the poundage has increased
by 6.6%.  This is over 4 times the level of the last increase experienced.  This equates
to additional costs of £1.4 million for the Council, £1 million more than the Budget
Strategy increase we had assumed.   
Impact on the 2024/2025 Budget Gap: £1.000 million 
5.8. Impact on Budget Gap:  The Budget gap reported to members in November 2023
was £20.7 million.  Taking into account the movements covered in sections 5.1 to 5.6,
the Budget Gap would now be £21.070 million.  This is summarised in Table 1. 
Table 1 – Updated 2024/2025 Budget Strategy 
Post-
Settlement
£m
November
2023
£m
Budget Gap (as at 22 November 2023) (section 4.1) 20.700 20.700
Less:  
- Impact of Grant Cut (section 5.1-5.5) (0.630) -
Add:  
- Increase in Costs from Rates Poundage (section 5.6/5.7) 1.000 -
Revised Budget Gap / Savings Requirement  21.070 20.700 
5.9. Other Budget Issues
5.9.1. Teachers’ Pension:  The Council’s contribution to Teacher’s Pensions is to increase
as of 1 April 2024.  A recent letter from the Deputy First Minister to CoSLA advised
that the “UK Government have publicly stated that the funding will be allocated to
individual UK Government departments in spring 2024.  Scottish Ministers will make
decisions on funding allocations once the UK Government funding position is clearer
and the implications for consequentials are understood”.  It is noted that the Settlement
does not yet include any allocation for the cost of this increase.  It is anticipated that
this would cost the Council approximately £5.6 million.  If this funding is not provided
by the Scottish Government for 2024/2025, then the Council will need to take in-year
action to cover these costs.   
5.9.2. Teacher Numbers:  In 2023/2024, the Settlement included a holdback for Retained
Teacher Support.  This was on the basis that teacher numbers would be maintained. 
The Settlement for 2024/2025 does not include any similar holdback, however, a
recent letter from Jenny Gilruth MSP to CoSLA states that the Scottish Government
will provide further detail related to the maintenance of teacher numbers in the new
year and the conditions around the £145.5 million allocated for this purpose once
Scottish Government have finalised the process that is currently underway related to
this year’s figures.  Members will be updated on this once further information is
received.   
5.9.3. Lanarkshire Valuation Joint Board Requisition:  As part of the Budget Strategy for
the Lanarkshire Valuation Joint Board, it was agreed that the Requisition Payments by
each of South and North Lanarkshire Council’s be reduced by £0.200 million each in
2024/2025.  This is predominantly to reflect the reduction in Pension Contributions
required by the Board in 2024/2025 (and 2025/2026) and will be in place until
2026/2027 where the majority of this will be considered for restatement.  The Council’s
Budget Gap will, therefore, benefit by this reduction in costs in the next 2 financial
years.    
Impact on the 2024/2025 Budget Gap: (£0.200 million )
55

Page 56

(reinstatement into 2026/2027) 
5.9.4. Non-Domestic Rates – Empty Property Relief:  A recent report to the Finance and
Corporate Resources Committee (6 December 2023) highlighted the financial benefit
of a change to the Council’s policy on Empty Property Relief.  Taking this benefit
alongside the estimated cost of Empty Property Relief for 2024/2025 results in a
potential overspend of £0.400 million.  As part of the 2024/2025 Budget Update
(November 2023), an amount of £0.700 million was set aside to manage this
anticipated overspend on a one-off basis.  As a result, there is a one-off benefit of
£0.300 million towards the Council’s Budget Gap in 2024/2025. 
Impact on the 2024/2025 Budget Gap: (£0.300 million (one-off)) 
5.10.  Service Concessions: As previously advised (Executive, November 2023), the
Council has already benefited from revised Guidance on Service Concessions
(approved by Council in January 2023).  This allowed a contribution towards Budget
Gaps through extending the term we repaid debt to match the life of the asset in
relation to our PPP arrangements. Guidance in relation to Accounting for Leases is
being adopted by Councils in 2024/2025, and the Council’s external advisor is
reviewing any additional options around this and the Accounting for Service
Concessions.  Work on this has not yet concluded.  Any further opportunities around
this will be reported back to members when available. 
5.11. Table 2 takes into account the Other Budget issues noted in section 5.9 which total
£0.500 million.  The result is a Budget Gap of £20.570 million. 
Table 2 – Updated 2024/2025 Budget Strategy including Other Issues 
Post-
Settlement
£m
November
2023
£m
Revised Budget Gap / Savings Requirement 
– Table 1
21.070 20.700
Impact of Reduction in Requisition for Lanarkshire
Valuation Joint Board (section 5.9.3)
(0.200) -
Impact of Non-Domestic Rates / Empty Property Relief
Changes (section 5.9.4)
(0.300) -
Revised Budget Gap / Savings Requirement inc
Other Issues
20.570 20.700
Value of Savings Proposals (Appendix 2, 22 November 2023) 18.569 18.569
Residual Shortfall in Budget Gap 2.001 2.131 
5.12. Table 2 also shows the residual Shortfall in the Budget Gap of £2.001 million after the
Settlement, compared to the position in November 2023.  That would rely on the full
savings package of £18.569 million being approved by members. 
6. Council Tax
6.1. At this point, the Budget Strategy does not include any assumptions for Council Tax.
The First Minister announced a Council Tax Freeze in October 2023, and also noted
that the Scottish Government would fund the freeze for any councils which did not
increase their Council Tax into 2024/2025.  A national allocation of £144 million has
been advised, however, there was no information on the distribution of this within the
Settlement.  The Council’s indicative share of this national allocation of £144 million is
£7.7 million.  Any allocation of these monies to the Council would be conditional on
the Council approving a Council Tax Freeze.   
56

Page 57

6.2. Following its publication of the Budget Reality document, Leaders have written to the
Deputy First Minister to “request that the Scottish Government urgently reconsiders
the Local Government quantum and now engages in meaningful negotiations to
improve our funding position”. Specifically in relation to the Council Tax Freeze,
CoSLA have written to the Deputy First Minister and stated that their “initial analysis
of the draft settlement shows that the Council Tax Freeze is not fully funded. Given
the shortfall in core revenue funding, the £144 million revenue offered for a freeze is
immediately worth less. Leaders wish to reaffirm the position that the decision on
Council Tax can only be made by each full Council and it is, therefore, for each
individual Council to determine their own level of Council Tax”. 
7. Local Government Settlement – General Capital Grant Position
7.1. As well as advising of the General Revenue Grant position, the Settlement also
provided information on the Council’s General Capital Grant for 2024/2025.   
7.2. General Capital Grant (GCG): The Council’s allocation of GCG for 2024/2025 is
£19.276 million.  This is less than the allocation for 2023/2024 (£21.207 million) so
means a cut of £1.931 million (9.1%).  To provide some context, in 2019/20 we
received £27m of general capital grant, therefore, the 2024/25 General Capital Grant
is almost 30% less than it was in 2019/20. As well as receiving General and Specific
Grants direct from the Scottish Government, the Council also benefits from
Government monies received by other bodies, including SPT and Clyde Gateway. 
However, the Settlement announced in December also included reduction in the
allocations received by these bodies bringing their general capital support from the
Scottish Government to zero.  These organisations are challenging the budget cuts
with the Scottish Government, with discussions ongoing.  Projects are included in the
Council’s Capital programme which anticipated funding, which is now unlikely to be
received. Consideration may require to be given to how we can complete projects that
have been agreed, and for which some of these monies had been expected in
2024/2025. 
7.3. A proposed Capital Programme for 2024/2025 will be presented to members in
February 2024 for approval. 
7.4. Specific Capital Grants:  The Council’s allocation of the Specific Grants is £1.865
million.  The allocation of £0.425 million in Vacant and Derelict Land is a reduction of
£0.262 million compared to 2023/2024, and for Cycling, Walking and Safer Routes,
the £1.440 million is a reduction of £0.621 million on the 2023/2024 allocation of £2.061
million. 
7.5. Housing Capital Grants:  The recently published Scottish Government draft budget
for 2024/2025 showed a 22% reduction in the previously published funding available
for the Affordable Housing Supply Programme.  At this time, it is still unclear how the
Scottish Government will reduce individual Council’s funding.  Further discussions
are planned with the More Homes team at the Scottish Government for further clarity
on the situation.  Any reduction in Scottish Government grant available for the
Council may impact the planned investment to increase the overall supply of Council
housing over the coming years. 
8. 2023/2024 Probable Outturn/Council Tax
8.1. The probable Outturn for the current financial year is included in a separate report to
this meeting.  This reports an underspend of £9.000 million (after Transfers to
Reserves) and mainly relates to one-off income received as a result of a historic VAT
claim (notified in mid-December 2023), but also due to higher than anticipated levels
of Council Tax income.  The paper proposes that £3.000 million be transferred to
57

Page 58

Reserves and be used to fund Budget pressures into 2024/2025.  It also proposes
that the remaining £6.000 million be transferred to Reserves.  These monies could
be used in the Council’s Budget Strategy, bearing in mind the previously identified
savings requirement of £95.8 million across the 4 years from 2024/2025. 
9. Summary 
9.1. Section 5 of this report updates the Budget Strategy presented in November 2023,
taking account of the impact of the Local Government Settlement including the change
to the Rates Poundage (section 5.6).  Table 1 takes the original Budget Gap of £20.700
million to a revised Budget Gap of £21.070 million.   
9.2. The impact of Other Budget Issues noted in section 5.9 mean a benefit to the Budget
Gap of £0.500 million, revising the Budget Gap to £20.570 million (Table 2). 
9.3. Table 2 also shows the position after the Settlement and after the savings proposals
are taken into account: a residual shortfall in the Budget Gap of £2.001 million.   
9.4. Section 6 notes that a national allocation of £144 million has been advised for the
Council Tax Freeze, however, there was no information on the distribution of this within
the Settlement. The Council’s indicative share of this national allocation of £144 million
is £7.7 million. Any allocation of these monies to the Council would be conditional on
the Council approving a Council Tax Freeze.   
9.5. In relation to the Council Tax Freeze, CoSLA have written to the Deputy First Minister
and stated that their “initial analysis of the draft settlement shows that the Council Tax
Freeze is not fully funded. Given the shortfall in core revenue funding, the £144 million
revenue offered for a freeze is immediately worth less. Leaders wish to reaffirm the
position that the decision on Council Tax can only be made by each full Council and it
is, therefore, for each individual Council to determine their own level of Council Tax”. 
9.6. As noted in section 7, the Council’s allocation of General Capital Grant for 2024/2025
is a cut of £1.931 million (9.1%) on the 2023/2024 allocation.  Similarly, section 7.4
notes year-on-year reductions in grants for Vacant and Derelict Land and Cycling,
Walking and Safer Streets.  The Council also benefits from Government monies
received by other bodies such as SPT and Clyde Gateway, however, the Settlement
announced in December also included reductions in the allocations from the Scottish
Government to these bodies. The 2024/2025 Capital Programme paper will be
presented to members in February 2024. 
9.7. As noted in section 8, the 2023/2024 Probable Outturn exercise has concluded and is
reported to this meeting of the Executive Committee.   
10. Timeline to Approval 
10.1. There is a legal deadline for setting the Council budget (11 March 2023), however,
there are critical dates before then, including dates for issuing Council Tax and Rent
bills. 
10.2. The following timeline is a proposal for approving budgets (for General Services,
Housing, and the Capital Programme). 
Housing Revenue and Capital
Budget 2024/2025
Housing and Technical Resources
Committee 7 February 2024 
and
Executive Committee / Special Council
58

Page 59

21 February 2024 
Council Budget and Council Tax
Setting 2024/2025
Special Council
21 February 2024 
2024/2025 Capital Programme Special Council 
21 February 2024 
11. Employee Implications 
11.1. There are no workforce implications associated with this report.   
12. Financial Implications
12.1. The financial implications are summarised within the report. 
13. Climate Change, Sustainability and Environmental Implications
13.1. Each of the savings proposals will be assessed with regard to any potential negative
impact on the environment.  These will be made available to members so that they
can be considered as part of the decision-making process. 
13.2. Climate Change targets will have an impact on the Council’s future financial strategies. 
This will be included in future Budget Strategy papers as appropriate. 
14. Other Implications
14.1. The financial strategy is a way of managing a number of key risks which directly impact
on the funding available to deliver Council outcomes.  As detailed in the report, the
Strategy is based on a number of assumptions some of which, including finalised
Government Grant allocations, will crystallise over the coming weeks.   
15. Equality Impact Assessment and Consultation Arrangements
15.1. Equality Impact Assessments will be done for those savings proposals that require
them.  These will be made available to members before any decisions are taken, so
that they can be considered as part of the decision-making process.  In addition, an
assessment will be carried out in line with the Fairer Scotland Duty.  For details of the
work undertaken, please contact the Head of Personnel.   
15.2. In terms of consultation, the Trade Unions have been consulted on the Budget
Strategy and Savings Proposals.  With regard to consultation with the public, all
members of the public have been invited to comment on Budget (phase 1) and now
the savings themselves (phase 2) through a dedicated e-mail address and the online
survey.  This was advertised through the use of Social Media (Twitter and Facebook).   
15.3. The outcome of Phase 1 has been emailed to members previously.  The second phase
of the Budget Consultation is scheduled to conclude midnight on Friday, 19 January
2024.  The feedback from Phase 2 will be advised to all Elected Members in a
separately issued briefing paper, in advance of the special committee on 21 February
2024. 
Paul Manning
Chief Executive 
9 January 2024 
59

Page 60

60

Page 61

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 22 November 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Jackie Taylor, Head of Finance (Strategy), Finance and Corporate Resources 
Ext:  4637 (Tel:  01698 454637) 
61

Page 62

Appendix 1 
Extract from Appendix 1 of report to Executive Committee, 22 November 2023 
Use of Pension Contribution Benefit 
2024/25
£m
2025/26
£m
2026/27
£m
2027/28
£m
Total 
£m
Remaining Budget Gap before use of
Pension Fund Benefit 26.7 41.4 16.7 11.0  95.8*
Use Pension Fund Benefit – Temporary (4.0) (23.5) (17.7)  (45.2)
Requirement to Re-instate Temporary
Use of Pension Fund Benefit  4.0 23.5 17.7 45.2
Remaining Budget Gap after use of
Pension Benefit 22.7 21.9 22.5 28.7 95.8* 
Use of Probable Outturn Monies 
Use of Probable Outturn Monies  (2.0)   2.0 0.0
Remaining Budget Gap after Use of
Pension Benefit and Probable Outturn
Monies 
20.7 21.9 22.5 30.7 95.8* 
*Note that the remaining Budget Gap of £95.8 million over the 4 years is the same before
and after the use of the pension fund benefit and probable outturn monies. 
62

Page 63

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Executive Director - Community and Enterprise
Resources  
Subject: Commercial Opportunities 
1. Purpose of Report
1.1. The purpose of the report is to: -  
 provide an update on the work being undertaken to explore commercial
opportunities for the Council 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations: 
(1) to note the work being undertaken to explore commercial opportunities.   
3.  Background
3.1. The medium-term position regarding the Council’s budget means that the Council
needs to consider commercial opportunities to generate income.  This report sets out
the various opportunities which have/are being explored by the Head of Enterprise
and Sustainable Development.   
3.2. It is worth highlighting that there are regulations that restrict council activity on
investing in commercial opportunities purely for financial gain.  This can be managed
if investments can be linked to economic / regeneration outcomes. 
4. Town Centre Regeneration
4.1. Civic Centre, East Kilbride 
4.1.1. Working with colleagues in Property, Finance and Legal Services, Enterprise and
Sustainable Development have been preparing proposals for a 130,000sqft Grade A
office accommodation for an occupier on the Civic Centre site in East Kilbride.  Heads
of Terms had also been agreed with an investor who would deliver the project once
‘preferred developer status’ had been confirmed.  The Heads of Terms would have
secured a capital receipt for the site, taking account of the demolition costs of the
building.   
4.1.2. Unfortunately, the occupier is no longer seeking a new build development but instead
has identified existing premises within East Kilbride to which to relocate.  Whilst this
opportunity would have realised a modest capital receipt for the Council, it would have
also removed a liability and acted as the catalyst for the redevelopment of the wider
town centre.    
9
63

Page 64

4.1.3. Given the extent of the design work undertaken to develop the proposal, it is intended
to take the opportunity to the market early in 2024 to seek an alternative occupier.   
4.2. East Kilbride Shopping Centre 
4.2.1. On 13 September 2023, Committee approved the East Kilbride Town Centre
masterplan as the basis for the future strategic approach to investment.  Since that
time, Enterprise and Sustainable Development together with colleagues in Property,
Housing and Finance have been undertaking an options appraisal for the
redevelopment of the existing Centre West site as a new residential neighbourhood,
which the Council owns the ground lease.  A potential investor has been identified,
however, other delivery methods have also been identified and are being explored.   
4.2.2. Discussions are also continuing with the administrators of the shopping centre
regarding the relocation strategy of the remaining retail units with Centre West and
when vacant possession may be achieved.   
4.2.3. A more detailed report will be brought to Committee in due course once a preferred
delivery method has been identified, together with proposed timeline and associated
risks for the Council.   
4.3. Hamilton Town Centre
4.3.1 Work is concluding on the preparation of a masterplan for Hamilton Town Centre which
will include proposals for the New Cross Centre, which the Council owns, and the
Regent Centre, which the Council has the ground lease.  Members will be briefed on
the masterplan in the coming weeks and a formal report will be presented to the
Executive Committee in February, however, there will be opportunities for the Council
to dispose of assets and/or work in partnership with the private sector to realise new
residential developments.   
4.4. Inward Investment 
4.4.1. Scotland’s Inward Investment Plan: Shaping Scotland’s Economy sets out the national
approach to targeting and attracting inward investment. Scottish Development
International (SDI) is Scotland's trade and inward investment agency. SDI engage with
major businesses and investors from around the world to encourage them to do
business in or with Scotland.  Over the last 12 months, the Council has sought to
strengthen its relationship with key SDI representatives and tap into the inward
investment opportunities it can provide.  However, it is apparent that more could be
done to strengthen the Council’s approach to inward investment.   
4.4.2. A report on Inward Investment will be presented to the Community and Enterprise
Resources Committee in February, however, the Executive Committee should be
aware of the following opportunities:-   
 review of Council owned land and sites for disposal
 review of Council’s industrial portfolio and opportunities to create new revenue
streams e.g. Cathcart Place in Rutherglen where a Regeneration Capital Grant
Fund application has been made to support the delivery of new industrial space   
4.5. Renewable Energy 
4.5.1. Discussions have taken place with a wind farm operator regarding a potential joint
venture in the delivery and operation of a wind farm.  The scale of the investment
64

Page 65

would likely be significant and, given changes in legislation, this commercial
investment would now not be possible.   
4.5.2  Officers are also exploring opportunities for battery storage and solar array on Council
own land.  Discussions are taking place with Scottish Power Energy Networks and
North Ayrshire Council who have established a solar photovoltaic farm which is
estimated to generate £12.8m over a 20-year period.   
4.5.3. Likewise, district heating opportunities are being explored with colleagues in Technical
Services including delivery models.   
4.5.4. Officers are also exploring commercial delivery models for electric vehicle charging to
be rolled out across Glasgow City Region.   
6. Next Steps and Timescales
6.1. There are a number of opportunities being explored which have varying timelines. 
Separate reports will be brought to Committee as opportunities crystalise, and
approvals sought.   
7. Employee Implications
7.1. Opportunities are being led by officers within Enterprise and Sustainable Development
Service. 
8. Financial Implications
8.1. There are no financial implications of this report.  The opportunities being explored
aim to ultimately generate income for the Council and, in the short to medium term,
contribute to future year’s budget strategies.   
9. Climate Change, Sustainability and Environmental Implications
9.1. Any project will be taken forward in line with the Council’s sustainability objectives. 
10. Other Implications
10.1. A number of the opportunities being explored have current and future liabilities for the
Council which require to be mitigated.  Disposal and redevelopment must be actively
considered, which may incur some upfront expenditure.   
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, therefore, no Impact Assessment is
required. 
11.2. Consultations have taken place with a number of Resources and will continue to do
so as projects are developed.   
David Booth 
Executive Director (Community and Enterprise Resources) 
8 January 2024 
Link(s) to Council Values/Priorities /Outcomes
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Working towards a sustainable future in a sustainable environment
65

Page 66

 Thriving business, fair jobs and vibrant town centres 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Alison Brown, Head of Enterprise and Sustainable Development  
alison.brown@southlanarkshire.gov.uk 
66

Page 67

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 January 2024
Report by: Chief Executive 
Subject: Representation on Outside Bodies – Clydesdale
Citizens’ Advice Bureau 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 advise of the action taken, in terms of Standing Order No 37(c), due to the
timescales involved, by the Chief Executive, in consultation with the Chair and
an ex officio member, to appoint Councillor McClymont as the Council’s
representative on Clydesdale Citizens’ Advice Bureau 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation: -
[recs]
(1) that the action taken, in terms of Standing Order No 37(c) by the Chief
Executive, in consultation with the Chair and an ex officio member, to appoint
Councillor McClymont as the Council’s representative on Clydesdale Citizens’
Advice Bureau be noted.
[1r
3. Background
3.1. The Council, at its meeting on 18 May 2022, approved its representation on certain
statutory joint boards and outside bodies.  A report which provided an update on
arrangements which were delegated to the Chief Executive to finalise was submitted
to the Council on 15 June 2022.  At that meeting, it was agreed that a report to consider
any further representation on a number of other bodies be submitted to the Executive
Committee.   
4.  Representation on Clydesdale Citizens’ Advice Bureau 
4.1.  At the meeting of the Executive Committee held on 29 June 2022, it was noted that,
due to the large number of requests for elected member involvement received from
organisations, the Council was not in a position to nominate a representative to every
organisation which requested this.  Those bodies, including Clydesdale Citizens’
Advice Bureau, were advised accordingly. 
4.2. The Council is now in a position to appoint a representative to Clydesdale Citizens’
Advice Bureau and Councillor McClymont had intimated her interest in an appointment
to this organisation.  Similarly, Clydesdale Citizens’ Advice Bureau had confirmed that
it would wish to have elected member representation. 
4.3 To allow Councillor McClymont to take up the appointment to Clydesdale Citizens’
Advice Bureau without delay, in terms of Standing Order No 37(c) of the Council’s
Standing Orders on Procedures, the Chief Executive, in consultation with the Chair
10
67

Page 68

and an ex officio member, approved Councillor McClymont’s appointment as the
Council’s representative on Clydesdale Citizens’ Advice Bureau. 
5.  Employee Implications 
5.1.  None. 
6.  Financial Implications 
6.1.  None. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications as a result
of this report.  
8.  Other Implications 
8.1.  There are no issues in terms of risk arising from this report. 
9.  Equality Impact Arrangements and Consultation Arrangements
9.1.  This report does not introduce a new policy function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
Paul Manning
Chief Executive 
4 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective and efficient. 
Previous References
 South Lanarkshire Council 18 May and 15 June 2022 
 Executive Committee, 29 June 2022 
List of Background Papers 
 None 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Pauline MacRae, Administration Adviser
Ext: 4108(Tel: 01698 454108) 
E-mail: pauline.macrae@southlanarkshire.gov.uk
68