Agenda Document Pack - Executive Committee - 13/09/2023

South Lanarkshire Council · 13 September 2023
Back to Executive Committee — 13 September 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 05 September 2023 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 13 September 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Lynsey Hamilton, Mark Horsham, Eileen Logan, Katy
Loudon, Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley McDonald,
Mark McGeever, Davie McLachlan, Richard Nelson, Mo Razzaq, Kirsten Robb, John Ross, David
Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Elise Frame, Graeme Horne, Martin
Hose, Susan Kerr, Ross Lambie, Elaine McDougall, Norman Rae, Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
The minutes of the meeting of the Executive Committee held on 16 August 2023
submitted for approval as a correct record.  (Copy attached) 
3 - 10 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 1 April to 11 August 2023
Report dated 23 August 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
11 - 16 
4 Capital Budget 2023/2024 and Monitoring for Period 5 - 1 April to 11
August 2023
Report dated 23 August 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
17 - 24 
5 Additional Funding from Scottish Government and Other External Sources
Report dated 23 August 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
25 - 28 
Item(s) for Decision 
6 East Kilbride Town Centre Masterplan
Report by the Executive Director (Community and Enterprise Resources). 
(Copy to follow) 
7 Parking – Penalty Charge Notices (PCNs)
Report dated 24 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
29 - 32 
Item(s) for Noting 
8 Council Complaints Report: SPSO Annual Overview 2022/2023
Report dated 18 August 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
33 - 46 
Urgent Business 
9 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
2

Page 3

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 16 August 2023 
Chair:
Councillor Gerry Convery (Depute) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Margaret Cooper,
Councillor Andrea Cowan, Councillor Margaret Cowie (substitute for Councillor Lesley McDonald),
Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller, Councillor Lynsey Hamilton,
Councillor Mark Horsham, Councillor Susan Kerr (substitute for Councillor Joe Fagan), Councillor
Ross Lambie (substitute for Councillor Kenny McCreary), Councillor Eileen Logan, Councillor Katy
Loudon, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Catherine McClymont,
Councillor Mark McGeever, Councillor Davie McLachlan, Councillor Richard Nelson, Councillor Mo
Razzaq, Councillor Kirsten Robb, Councillor John Ross, Councillor David Shearer, Councillor
Margaret B Walker 
Councillors' Apologies:
Councillor Joe Fagan (Chair, ex officio), Councillor Kenny McCreary, Councillor Lesley McDonald 
Attending:
Chief Executive’s Service
C Sneddon, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director
Education Resources
C McKenzie, Executive Director
Finance and Corporate Resources
P Manning, Executive Director; C Fergusson, Head of Finance (Transactions); T Little, Head of
Communications and Strategy; G McCann, Head of Administration and Legal Services; P MacRae,
Administration Adviser; K McLeod, Administration Assistant; M Milne, Head of Personnel Services
Housing and Technical Resources
S Gibson, Executive Director
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 21 June 2023 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
Councillor Allison requested an update on the position regarding actions in respect of the South
Lanarkshire Leisure and Culture (SLLC) commissioned external legal review.  The Chair
responded, advising of actions proposed to progress this matter.  
2
3

Page 4

3 Revenue Budget Monitoring for Period 1 April 2023 to 14 July 2023 
A report dated 26 July 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April to 14 July 2023. 
At 14 July 2023, the position on the General Fund Revenue Account was breakeven.  Details
were given on:- 
 budget pressures within Children and Families Services
 the position following the outcome of the Job Evaluation exercise for Home Carers 
The Housing Revenue Account showed a breakeven position at 14 July 2023. 
The Committee decided: 
(1) that the breakeven position on the General Fund Revenue Account at 14 July 2023, as
detailed in section 4 and Appendix 1 of the report, be noted; and 
(2) that the breakeven position on the Housing Revenue Account at 14 July 2023, as detailed
in section 5 and Appendix 2 of the report, be noted. 
[Reference:  Minutes of 21 June 2023 (Paragraph 4)] 
4 Capital Budget 2023/2024 and Monitoring for Period 4 - 1 April 2023 to 14 July
2023 
A report dated 26 July 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on progress of the General Fund Capital Programme and the Housing Capital
Programme for the period 1 April to 14 July 2023. 
At its meeting on 21 June 2023, the Committee had approved a General Fund Capital
Programme for 2023/2024 totalling £81.990 million.  A revised programme of £83.322 million
was now anticipated which included proposed adjustments to the programme totalling a net
increase of £1.332 million.  The proposed adjustments were detailed in Appendix 1 to the report. 
The increase reflected additional funding from external bodies which required to be spent on
specific programmes of work. 
At 14 July 2023, £9.865 million had been spent on the General Fund Capital Programme, a
slight underspend of £0.142 million, and actual funding received to 14 July 2023 totalled
£41.715 million.  The programme spend and funding for the General Fund for the period was
detailed in appendices 2 and 3 to the report. 
The Housing Capital Programme 2023/2024, approved by the Executive Committee at its
meeting on 21 June 2023, totalled £63.916 million.  Details of the position of the programme at
14 July 2023 were provided in Appendix 4 to the report.  Adjustments to the Housing
Programme, as detailed in the report, had resulted in a proposed revised programme of £69.596
million.  Programmed funding for the year also amounted to £69.596 million. 
At 14 July 2023, the budget for the Housing Capital Programme amounted to £13.250 million.
Expenditure for the period totalled £12.469 million and actual funding received to 14 July 2023
also amounted to £12.469 million.  
4

Page 5

The Committee decided: 
(1) that the period 4 position, at 14 July 2023, of the General Fund Capital Programme,
detailed in appendices 2 and 3 of the report, and the Housing Capital Programme, detailed
at Appendix 4 of the report, be noted; 
(2) that the adjustments to the General Fund programme, as detailed in Appendix 1 of the
report, and the Housing programme, as detailed in Sections 5.1 and 5.2 of the report, be
approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference:  Minutes of 21 June 2023 (Paragraph 6)] 
5 Additional Funding from Scottish Government and Other External Sources 
A report dated 27 July 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on additional funding, totalling £1.478 million, which had been made available to the
Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2023/2024 
(£m) 
Education 0.458 
Total 0.458 
Capital Funding 
Resource 2023/2024 
(£m) 
Community and Enterprise 1.020 
Total 1.020 
Overall Total 1.478 
The Committee decided: that the report be noted. 
[Reference: Minutes of 21 June 2023 (Paragraph 7)] 
6 Cost of Living – Support 
A report dated 4 July 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the support provided to households in South Lanarkshire which had been
significantly impacted by the cost of living crisis. 
An update was provided on the cost of living supports approved by the Executive Committee at
its meeting held on 21 September 2022 including:- 
 the Financial Wellbeing Support Fund which had, from the launch of the fund to the end of
the financial year, supported 5,137 households, distributing £1.2 million in funding to
households  
5

Page 6

 energy support through the delivery of an energy voucher scheme for households on
prepaid meters and the Capped Meter Fund which supported social rented tenants who
were struggling to pay their utility costs and had had their pre-payment meter capped
 the Digital Inclusion Fund which had been established to help residents, particularly in high
Scottish Index of Multiple Deprivation areas, access services digitally 
Given the success of the Financial Wellbeing Support Fund in distributing cash to households,
coupled with advice and support, it was proposed to redirect funding earmarked for the provision
of energy vouchers in 2023/2024 for a further round of wellbeing payments. 
The energy voucher scheme had resulted in 8,000 vouchers being issued to households by the
end of May 2023.  The activity would continue to the end of August 2023, following which it was
proposed that any underspend be ringfenced for further support activity through the Financial
Wellbeing Support Fund. 
Details were also given on existing Council support for households including:- 
 support from the Money Matters Advice Service
 provision of grants through the Scottish Welfare Fund
 support for tenants with rent arrears
 provision of benefits
 write-off of school meal debt 
At its meeting on 30 November 2022, the Executive Committee approved additional supports for
those affected by the cost of living crisis including:- 
 further payment to South Lanarkshire Leisure and Culture (SLLC).  Providing extra funds
had enabled SLLC to keep all facilities, which were operating at that time, open throughout
the winter and available for the community to access.  People across the communities in
South Lanarkshire were also able to access warm space within SLLC run facilities
throughout winter 2022/2023 as part of the Warm Welcome Initiative.  SLLC’s response to
the Warm Welcome Initiative included:-
 provision of space within libraries
 Stay and Play sessions for families
 Bookbug Sessions
 free lets to community groups
 free swims for under 16 residents
 support for foodbanks
 extension of school meal payouts to weekends
 support for looked after children 
The significant pressure on household finances as a result of the cost of living crisis was
expected to continue throughout 2023/2024.  The Council would continue to provide support
from the range of services and budgets available, however, the financial challenges faced by
councils was a limiting factor in the level of support that could be provided to households in
South Lanarkshire. 
There followed a full discussion during which officers responded to members’ questions on
various aspects of the report. 
The Committee decided: 
(1) that the range of support being provided by the Council to households in response to the
impact of the cost-of-living crisis be noted;  
6

Page 7

(2) that the redirection of 2023/2024 funding for energy support to the Financial Wellbeing
Support Fund, as detailed in section 4.1 of the report, be approved; and 
(3) that the redirection of any underspend from the provision of energy support to the Financial
Wellbeing Support Fund, as detailed in section 4.2 of the report, be approved. 
[Reference: Minutes of 21 September 2022 (Paragraph 12) and 30 November 2022
(Paragraph 11)] 
7 Job Evaluation – Back Pay 
A report dated 26 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on a proposed funding package to meet the cost of paying the backdated element of
the recently agreed Home Carers’ Job Evaluation. 
The cost of backdating the Job Evaluation outcome for Home Carers to October 2020 had been
estimated at £18 million.  Those costs required to be included in the financial position for
2022/2023.  As the costs were in relation to Home Care, which was a delegated service, the
costs would fall under the Integration Joint Board (IJB) and would require to form part of its
financial accounts. 
It was proposed that the costs be met as follows, details of which were provided in Table 1 of
the report:- 
 £5.6 million – IJB underspend
 £7.2 million – IJB reserves
 £0.3 million - additional IJB underspend
 £2.7 million - Council reserves set aside for use in future budget strategies
 £2.2 million - uncommitted service concession funds 
Total £18 million 
The £7.2 million IJB reserves were intended to be used to balance the IJB budget in 2023/2024
and, without those reserves, the IJB would be unable to balance its budget in the current
financial year.  As a result, it was proposed that the Council provide a one-off contribution to the
IJB of £7.2 million. 
It was proposed that this contribution be made up as follows, details of which were provided in
Table 2 of the report:- 
 £4.7 million - use of reserves with no current date for spend
 £0.8 million – uncommitted underspend from 2022/2023
 £1.2 million – uncommitted service concessions
 £0.5 million – unallocated COVID funds 
Total £7.2 million 
The funding solution detailed in the report left the solutions previously identified to support the
2024/2025 and 2025/2026 budget strategy intact. 
The Committee decided: 
(1) that the estimated costs of back pay for Home Carers of £18 million, which would be
accounted for in 2022/2023, be noted; 
(2) that the funding solution detailed in Table 1 of the report be noted;  
7

Page 8

(3) that the one-off payment in 2022/2023 to the IJB from uncommitted service concessions
towards the funding solution (£2.2 million), as detailed in Table 1 (line 5) of the report, be
approved; and 
(4) that the one-off payment, totalling £7.2 million, to the IJB to reimburse IJB reserves in
2023/2024, as detailed at section 5 and Table 2 of the report, including reserves,
unallocated underspends, uncommitted service concession funds and COVID funds, be
approved. 
[Reference:  Minutes of 21 June 2023 (Paragraph 3)] 
8 Land and Property Transfers and Disposals 
A report dated 20 July 2023 by the Executive Director (Housing and Technical Resources) was
submitted on proposed actions in respect of land and property transactions. 
The recommendations had been made in terms of agreed procedures for dealing with surplus
land and property. 
The Committee decided: 
(1) that the land and property, as detailed in Appendix A of the report, be transferred between
Resources; and 
(2) that the land detailed in Appendix B of the report be declared surplus to Council
requirements. 
9 South Lanarkshire Council Response to Pre-budget Scrutiny Call for Evidence on
Sustainability of Scotland’s Finances 
A report dated 1 August 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on the Council’s proposed response to the call for evidence on the sustainability
of Scotland’s finances, issued by the Finance and Public Administration Committee of the
Scottish Parliament, as part of the pre-budget scrutiny process. 
The focus of the Finance and Public Administration Committee’s enquiry was the sustainability
of Scotland’s finances in both the short and longer term and details of the challenges faced
within both time frames were provided in the report.  Details were also given of the questions on
which the Committee had asked for views. 
The Council’s response to the call for views was attached as Appendix 1 to the report and
emphasised the unprecedented financial pressures faced by local government.  It made the
point that any further reductions in budgets would have severe implications for councils’ ability to
deliver services which would, in turn, hinder the ability of councils to support Scottish
Government priorities and the achievement of national outcomes.   
The proposed response included the following key points:- 
 local authorities had a pivotal role in delivering national outcomes and medium and long
term strategies for funding the public sector should recognise this key role
 reductions in budget and significant increases in costs over a sustained period had
significantly reduced the capacity of councils to offer a range of core services and respond
to national issues such as the cost of living crisis and carbon reduction  
8

Page 9

 current funding arrangements limited the ability of councils to plan and invest in dealing
with long term systemic challenges and single year budgets for local government restricted
longer term planning, fostering short term interventions
 government required to take current unprecedented pressures into account when making
spending decisions, especially where they affected frontline council services 
The Parliamentary Committee had issued its call for views as part of the normal pre-budget
scrutiny process.  The Committee would hear oral evidence in September/October 2023 and
consider the draft report in early November, with a view to publication shortly thereafter.  If
approved, the response detailed in Appendix 1 would be submitted to the Scottish Parliament by
the deadline of 16 August 2023. 
The Committee decided: 
(1) that the Council’s response to the call for evidence, attached at Appendix 1 to the report,
be approved; and 
(2) that the response be submitted to the Scottish Parliament by the deadline of 16 August
2023. 
10 Glasgow City Region City Deal – A72 Lanark Road M74 Junction 7 Signalisation –
Revised Full Business Case 
A report dated 27 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on action taken, in terms of Standing Order No 37(c), because of the timescales
involved, by the Chief Executive, in consultation with the Chair and an ex officio member, to
approve the revised Full Business Case (FBC) for the A72 Lanark Road/M74 Junction 7
Signalisation element of the Larkhall Community Growth Area City Deal Project. 
Following the withdrawal of the successful contractor for the A72 Lanark Road/M74 Junction 7
Signalisation element of the Larkhall Community Growth Area City Deal Project, a revised FBC
had been produced covering the next most favourable submission tendered for the project. 
The Executive Summary of the revised FBC was attached as Appendix 1 to the report. 
The Committee decided: that the following action taken, in terms of Standing Order
No 37(c), by the Chief Executive, in consultation with the
Chair and an ex officio member, be noted:- 
 approval of the revised A72 Lanark Road/M74
Junction 7 Signalisation Full Business Case
 approval to seek grant funding in accordance with the
City Deal Grant Distribution Process outlined in the
Assurance Framework in relation to the delivery of
the project, with the precise arrangements to be
agreed by the City Deal Chief Executive’s Group
(CEG) and City Deal Cabinet 
[Reference:  Minutes of 17 May 2023 (Paragraph 4)] 
11 Urgent Business 
There were no items of urgent business. 
9

Page 10

10

Page 11

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 1 April 2023 to
11 August 2023 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Committee of the overall financial position of the Council’s General
Fund Revenue Account and Housing Revenue Account for the period 1 April
2023 to 11 August 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the break-even position on the General Fund Revenue Account at 11
August 2023, (section 4 and Appendix 1), be noted; and
(2) that the break-even position on the Housing Revenue Account at 11 August
2023 (section 5 and Appendix 2 of the report), be noted. 
3. Background
3.1. This overview report will summarise the actual expenditure and income to 11 August
2023 compared with the budget for the same period for both the Council’s General
Fund (section 4) and for the Housing Revenue Account (section 5).   
4. 2023/2024 General Services 
4.1.  General Services Current Position as at 11 August 2023 
As at 11 August 2023, the position on the General Services budget is break-even.  The
position across Resources is detailed in Appendix 1. 
4.2. Children and Families:  As detailed in the previous report, budget pressures within
Children and Families are continuing into 2023/2024 in relation to residential
placements, fostering and kinship care, some of which is a legacy from the pandemic.   
4.3. As previously advised to Social Work Committee (28 June 2023), there is one-off
funding identified totalling £9.2 million, and this is available this financial year to
contribute towards these residual Children and Families’ pressures.   
4.4. The Social Work Resources position as at 11 August 2023 assumes funding will be
available and will be drawn down later in the financial year, as required.  The Resource
is working towards managing the overall budget pressure in Children and Families by
2024/2025. 
3
11

Page 12

4.5 Finance Services are working with Housing and Technical Resources and Social Work
Resources to create housing and support options for young people eligible for
continuing care.  The full year impact is estimated to be £2.4 million for current
placements identified for housing (the estimated impact in 2023/2024 is £0.9 million). 
These estimates include a contribution from Education. 
4.6.  Adults and Older People:  A previously advised, within Adults and Older People, the
outcome of the Job Evaluation exercise for Home Carers will result in recurring costs
of approximately £7 million from 2023/2024.  These costs are not included in the
Integration Joint Board (IJB) budget set for 2023/2024.  As at 11 August, costs of £2.4
million have been incurred in relation to the cost of the grade changes.  These costs
are incurred through the IJB budget.  As a consequence of the reporting requirements
for these integrated authorities, these costs also appear within the figures included in
Appendix 1.  This does not show as an overspend in Appendix 1 as there is sufficient
budget available at this stage in the financial year to cover the additional costs incurred
to date. 
4.7. Officers within the IJB are looking to identify recurring funding solutions.  These
solutions and an overall recovery plan will be reported to the IJB on 19 September
2023 and, subject to their approval, budgets will be realigned. 
4.8. Teacher Numbers:  The Cabinet Secretary has held back £45.5 million of funding
nationally for the maintenance of Teacher Numbers, until after the 2023 Census details
are received by the Government, and until councils provide assurance that they have
maintained teacher numbers and pupil support numbers at the 2022 level.  For the
Council, this amounts to £2.934 million. 
4.9. Senior officers from the Council have been liaising with the Government since the start
of the financial year to explain the Council’s position, as a reduction in numbers
compared to the 2022 Census position is anticipated.  The reason is that the Census
2022 reflected an inflated level of teachers/support staff who were in place because
of funding invested by the Council, and not because of Government funding initiatives. 
The extra staff in place were facilitated by investment monies and temporary Covid
funding supporting learning recovery for the 2022/2023 school session only, and were
never intended to be assumed as the core level of staffing against which the Council
should be measured.   
4.10. The Government has advised that no decision on releasing the funding will be taken
until after the Census 2023 has been finalised and, therefore, there is a risk to the
£2.934 million funding currently being held back.   
5. Housing Revenue Account Position as at 11 August 2023
5.1. As at 11 August 2023, Appendix 2 shows a break-even position against the phased
budget on the Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
12

Page 13

9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
2. Equality Impact Assessment and Consultation Arrangements
2.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
2.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
23 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 11 August 2023. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
13

Page 14

Appendix 1 (a) 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 11 August 2023 (No.5) 
Resource / Committee
Annual
Budget
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
to 11/08/23 
Actual to
11/08/23 
Variance to
11/08/23 
Departments: £m £m £m  £m £m £m 
Community and Enterprise Resources 129.342 129.342 0.000  40.979 40.979 0.000 
Facilities, Waste and Grounds 77.569 77.569 0.000  24.350 24.220 0.130 under
Leisure and Culture 23.227 23.227 0.000  5.355 5.356 (0.001) over
Planning and Regulatory 4.966 4.966 0.000  1.716 1.548 0.168 under
Environmental and Sustainable Development 4.698 4.698 0.000  (0.341) (0.406) 0.065 under
Roads, Transportation and Fleet 18.882 18.882 0.000  9.899 10.261 (0.362) over
Education Resources 417.789 417.789 0.000  152.845 152.845 0.000  
Education 417.789 417.789 0.000  152.845 152.845 0.000  
Finance and Corporate Resources 41.558 41.558 0.000  21.381 21.381 0.000  
Finance Services - Strategy 2.118 2.118 0.000  1.163 1.124 0.039 under
Finance Services - Transactions 18.448 18.448 0.000  7.056 6.844 0.212 under
Audit and Compliance Services 0.374 0.374 0.000  0.178 0.189 (0.011) over
Information Technology Services 5.226 5.226 0.000  6.177 6.124 0.053 under
Communications and Strategy Services 2.805 2.805 0.000  1.292 1.300 (0.008) over
Administration and Licensing Services 4.279 4.279 0.000  1.862 1.971 (0.109) over
Personnel Services 8.308 8.308 0.000  3.653 3.829 (0.176) over
Housing and Technical Resources 14.176 14.176 0.000  14.297 14.297 0.000  
Housing Services 8.464 8.464 0.000  2.722 2.722 0.000  
Property Services 5.712 5.712 0.000  11.575 11.575 0.000  
Social Work Resources 214.719 214.719 0.000  87.041 87.041 0.000  
Performance and Support Services 6.358 6.358 0.000  1.968 1.879 0.089 under
Children and Families 37.215 37.215 0.000  14.872 15.012 (0.140) over
Adults and Older People 170.058 170.058 0.000  69.121 69.121 0.000  
Justice and Substance Misuse 1.088 1.088 0.000  1.080 1.029 0.051 under
Joint Boards 2.053 2.053 0.000  0.790 0.790 0.000           
819.637 819.637 0.000  317.333 317.333 0.000 
Summary
Annual
Budget
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
to 11/08/23 
Actual to
11/08/23 
Variance to
11/08/23 
£m £m £m  £m £m £m 
Service Departments Total 819.977 819.977 0.000  317.333 317.333 0.000 
CFCR 0.352 0.352 0.000  0.000 0.000 0.000  
Loan Charges 23.669 23.669 0.000  0.000 0.000 0.000  
Corporate Items 2.074 2.074 0.000  0.051 0.051 0.000  
Corporate Items (Strategy) 15.211 15.211 0.000  0.000 0.000 0.000  
2023/24 Investments – Transfers to Reserves 3.276 3.276 0.000  0.000 0.000 0.000             
Total Expenditure 864.219 864.219 0.000  317.384 317.384 0.000 
Council Tax 178.602 178.602 0.000  68.693 68.693 0.000 
Less: Council Tax Reduction Scheme (23.278) (23.278) 0.000  (8.953) (8.953) 0.000 
Net Council Tax 155.324 155.324 0.000  59.740 59.740 0.000 
General Revenue Grant 319.941 319.941 0.000  123.054 123.054 0.000 
Non-Domestic Rates 341.536 341.536 0.000  131.360 131.360 0.000 
Transfer from Reserves 47.418 47.418 0.000  47.418 47.418 0.000 
Total Income 864.219 864.219 0.000  361.572 361.572 0.000 
Net Expenditure / (Income)  0.000 0.000 0.000  (44.188) (44.188) 0.000 
14

Page 15

Appendix 1b 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 11 August 2023 (No.5) 
Budget Category 
Annual
Budget 
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
to 11/08/23 
Actual to
11/08/23 
Variance to
11/08/23 
Service Departments:  £m £m £m  £m £m £m 
Expenditure        
Employee Cost 613.816  613.816  0.000   212.682 212.667 0.015 under
Property Costs 61.907  61.907  0.000   14.833 15.105 (0.272) over
Supplies and Services 61.196  61.196  0.000   18.529 18.847 (0.318) over
Transport Costs 45.396  45.396  0.000   15.634 16.450 (0.816) over
Administration Costs 15.468  15.468  0.000   3.812 3.878 (0.066) over
Payments to Other Bodies 78.683  78.683  0.000   32.764 32.810 (0.046) over
Payments to Contractors 245.559  245.559  0.000   77.239 75.616 1.623 under
Transfer Payments 6.251  6.251  0.000   3.784 3.815 (0.031) over
Housing Benefits 65.650  65.650  0.000   20.950 20.950 0.000  
Financing Charges (controllable) 2.345  2.345  0.000   0.442 0.448 (0.006) over             
Total 1,196.271  1,196.271  0.000   400.669 400.586 0.083 under                
Service Departments Total 1,196.611  1,196.611  0.000   400.669 400.586 0.083 under
CFCR 0.352  0.352  0.000   0.000 0.000 0.000  
Loan Charges 23.669  23.669  0.000   0.000 0.000 0.000  
Corporate Items 2.074  2.074  0.000   0.041 0.041 0.000  
Corporate Items (Strategy) 15.211  15.211  0.000   0.000 0.000 0.000  
2023/24 Investments – Transfers to Reserves 3.276  3.276  0.000   0.000 0.000 0.000              
Total Expenditure 1,240.853  1,240.853  0.000   400.720 400.637 0.083 under            
Income           
Housing Benefit Subsidy 60.258  60.258  0.000   18.681 18.681 0.000  
Other Income 316.376  316.376  0.000   64.655 64.572 (0.083) under rec.
Council Tax (Net of Council Tax Reduction Scheme) 155.324  155.324  0.000   59.740 59.740 0.000  
General Revenue Grant 319.941  319.941  0.000   123.054 123.054 0.000  
Non-Domestic Rates 341.536  341.536  0.000   131.360 131.360 0.000  
Transfer from Reserves 47.418  47.418  0.000   47.418 47.418 0.000              
Total Income 1,240.853  1,240.853  0.000   444.908 444.825 (0.083) under rec.            
Net Expenditure / (Income) 0.000  0.000  0.000   (44.188) (44.188) 0.000           
15

Page 16

Appendix 2
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 11 August 2023 (No.5) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance   
Budget
Proportion
to 11/08/23 
Actual to
11/08/23 
Variance to
11/08/23 
% Note 
£m £m £m  £m £m £m   
Employee Costs 14.253 14.253 0.000  4.879 4.917 (0.038) over (0.8%) 
Property Costs 50.929  50.929  0.000  14.597 15.127 (0.530) over (3.6%) 1
Supplies & Services 0.433  0.433  0.000  0.087 0.098 (0.011) over (12.6%) 
Transport & Plant 0.196  0.196  0.000  0.061 0.054 0.007 under 11.5% 
Administration Costs 5.570  5.570  0.000  0.183 0.172 0.011 under 6.0% 
Payments to Other Bodies 2.974  2.974  0.000  0.785 0.813 (0.028) over (3.6%) 
Payments to Contractors 0.100  0.100  0.000  0..031 0.031 0.000 - 0.0% 
Transfer Payments 0.000  0.000  0.000  0.000 0.000 0.000 - 0.0% 
Financing Charges 27.162  27.162  0.000  8.385 8.404 (0.019) over (0.2%) 
Total Controllable Expenditure 101.617 101.617 0.000  29.008  29.616  (0.608) over (1.9%) 
Total Controllable Income (115.940) (115.940) 0.000  (38.141) (38.283) 0.142  over
recovered 0.3% 2
Transfer to/(from) Balance Sheet (4.907) (4.907) 0.000  (1.510) (1.976) 0.466  over
recovered 84.9% 3
Net Controllable Expenditure (19.230) (19.230) 0.000  (10.643) (10.643) 0.000  - 0.0% 
Add: Non Controllable Budgets         
Financing Charges 19.230  19.230  0.000  0.000  0.000  0.000  - 0.0% 
Total Budget 0.000  0.000  0.000  (10.643) (10.643) 0.000  - 0.0% 
Variance Explanations
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor. There is also an overspend in relation
to cleaning charges.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.  
3. The timing impact of the net overspend requires a higher than budgeted transfer from reserves at this time. 
Virements
None. 
16

Page 17

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 13 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2023/2024 and Monitoring for Period 5 -
1 April 2023 to 11 August 2023 
1. Purpose of Report
1.1. The purpose of the report is to: 
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2023 to
11 August 2023  
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the adjustments to the General Fund programme, listed at Appendix 1, be
approved; 
(2) that the period 5 position (ended 11 August 2023) of the General Fund Capital
Programme detailed in Appendices 2 to 3 and the Housing Capital Programme
at Appendix 4, be noted; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 11 August 2023.  Spending has been split into two separate sections: 
 General Fund Capital Programme including Education, Social Work, Roads and
Transportation and General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme 
4.1. 2023/2024 Budget: The budget agreed at Executive Committee on 16 August 2023
was £83.322 million.  A revised programme of £80.262 million is now anticipated,
which includes adjustments to the programme totalling a net decrease of £3.060
million, which are proposed in Appendix 1.   
4.2. The main reason for this reduction is profiling adjustments proposed by Community
and Enterprise Resources, and they include the output from the review of the
anticipated timing of spend on the Glasgow City Region City Deal project at
Stewartfield Way, East Kilbride (£3 million).  
4
17

Page 18

4.3. In addition, delays in Scottish Government approval for the overall project at Hairmyres
Station have had an impact on the timescales for the Park and Ride project.  As a
result, funding from Strathclyde Passenger Transport (£0.800 million) cannot be fully
utilised this financial year.  Furthermore, a timescale of works has now been agreed
with the contractor for the Glasgow City Region City Deal signalisation project at
Lanark Road, Larkhall, which will now commence on site January 2024.  This has
resulted in some expenditure falling into next financial year (£0.800 million).   
4.4. These reductions to the 2023/2024 programme (sections 4.2 and 4.3) are offset by
additional project funding awarded primarily from the Scottish Government’s
Regeneration Capital Grant Fund (£0.989 million) and Shared Prosperity Fund (£0.340
million). 
4.5. General Fund – Period 5 Position:  As noted in 4.1, the total capital spending
programme for the year is £80.262 million.  The detailed programme and spend for
the General Fund are shown in Appendices 2 and 3.   
4.6. Appendix 3 also shows budget for the period of £15.161 million and spend to the 11
August 2023 of £14.654 million.  The spend is, therefore, behind programme by £0.507
million.  This mainly relates to the new Wooddean Early Learning Centre, Bothwell
(formerly Clyde Terrace) within Education Resources, which is still scheduled to
handover in November 2023, as previously advised.     
4.7. Actual funding received to 11 August 2023 is £42.661 million.  Relevant officers will
closely monitor the generation of all income including receipts. 
5. Housing Capital Programme
5.1. 2023/2024 Budget:  Appendix 4 summarises the position on the Housing programme
as at 11 August 2023.  The revised capital programme for the year was £69.596
million, as approved by the Executive Committee on 16 August 2023.   
5.2. Programmed funding for the year also totals £69.596 million. The funding sources are
also detailed in Appendix 4. 
5.3. Period 5 Position:  Budget for the period is £16.115 million and spend to 11 August
2023 amounts to £15.580 million.  This results in the Housing Programme being
£0.535 million behind programme.  This is a timing issue only at this stage.   
5.4. As at 11 August 2023, £15.580 million of funding had been received. 
6. Employee Implications
6.1. There are no employee implications as a result of this report.  
7. Financial Implications
7.1. The General Services and Housing Programme Programmes and their spend position
to 11 August 2023 are detailed in sections 4 and 5 respectively. 
7.2. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to this Committee. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
18

Page 19

and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
23 August 2023 
Link(s) to Council Vision/Priorities/Values
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 16 August 2023 
List of Background Papers
 Capital Ledger prints to 11 August 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
19

Page 20

Appendix 1
Proposed Adjustments 
Community and Enterprise Resources 
Carnwath Community and Business Enterprise HUB
The Council has been awarded funding of £0.275 million from the Scottish
Government’s Regeneration Capital Grant Fund (RCG) towards the Carnwath
Community and Business Enterprise HUB project.  This will support the construction
of a community business and enterprise hub on the site already purchased in the
village. This RCG funding will augment funding already provided from the Council’s
Capital Programme, namely Place Based Investment Programme (£0.025m) for the
site purchase and Vacant and Derelict Land Fund (£0.100m) for the construction.   
Approval is sought to increase the 2023/2024 Capital Programme by £0.275 million
to reflect this grant award.   
£0.275m
Carluke High Mill Community Facility – Phase 1
Similarly, the Scottish Government has awarded South Lanarkshire £1.199 million
from the Regeneration Capital Grant Fund (RCGF) towards the new High Mill
Community Facility, Carluke.  This project will be led by a local Community Group
and will allow the refurbishment and repurpose of Carluke High Mill into a multi-
purpose community facility.  The Group have also been awarded Heritage Lottery
and Historic Environment Scotland funding for this project.   
Given the timescales for this project, anticipated spend in 2023/2024 is expected to
be £0.714 million, with the balance of £0.485 million required in financial year
2024/2025.  Therefore, approval is sought to increase the 2023/2024 Capital
programme by £0.714 million with the remainder (£0.485 million) being added to the
budget in 2024/2025 when appropriate. 
£0.714m
Leisure and Culture Transformation Fund - TACT Hall 
The TACT Hall, Blantyre is currently closed.  Essential works are required to the
heating / ventilation systems and the water tank to bring the hall back into operation. 
Approval is sought to add £0.187 million to the 2023/2024 Capital Programme to
undertake the necessary improvement works at the TACT Hall.  This will be funded
from the Leisure and Culture Transformation Fund.   
£0.187m
Strathclyde Passenger Transport – Hairmyres Park and Ride
Funding of £1 million for financial year 2023/2024 was secured from Strathclyde
Passenger Transport to contribute to the expansion of Hairmyres Station Park and
Ride.  However, Scottish Government approval for the overall project at Hairmyres
Station is still awaited.   
As a result, the Transport Scotland / Network Rail timeline for the delivery of the
overall project at Hairmyres Station has changed since the time of the Council’s
original funding bid.  Given these ongoing issues, approval is sought to reduce the
2023/2024 capital programme by £0.800 million.  The remaining funding allocated
for this financial year will allow for the conclusion of the planning application process
as well as the development of tender and contract documents.   
A bid for funding in future financial years will be submitted to Strathclyde Passenger
Transport to allow this project to progress.   
(£0.800m)  
20

Page 21

Glasgow City Region City Deal - Stewartfield Way 
Delivery timescales and financial matters remain under review in light of pressures
being experienced across this and other construction projects and currently
available design and contractor resources.  A phased delivery programme is being
considered with work now underway in relation to traffic modelling, revised junction
layouts, early action elements (electric vehicle / active travel).  Work continues in
relation to refining, rescoping and progressing the project to Outline Business Case
and this is expected over the next 9 to 12 months. 
As this work is ongoing, approval is sought to slip £3 million into the 2024/2025
Capital Programme to better reflect the more likely timing of spend.  (£3.000m)
Glasgow City Region City Deal – Lanark Road Signalisation
The 2023/2024 Capital Programme includes an allocation of £1.350 million to
progress a signalisation project at the M74 junction 7, Lanark Road, Larkhall.  Due
to the initially successful contractor withdrawing from the tender process the
second-place contractor was appointed. However, the resulting delay means it has
been necessary to restate the programme with works now commencing in January
2024 through to June 2024.  As a result, approval is sought to slip £0.800 million
into the 2024/2025 Capital Programme to better reflect the anticipated timing of
spend. 
(£0.800m)  
Education Resources 
Crawforddyke Primary School – ASN Adaptations 
Approval is sought to increase the 2023/24 Capital Programme to reflect £0.022m
of developer contributions already received from the development at the former
Roadmeetings Hospital, Carluke.  This funding will be utilised to alter the former
nursery toilets to facilitate use by primary school pupils at Crawforddyke Primary
School, Carluke. 
£0.022m  
Housing and Technical Resources 
Public Space CCTV 
As reported to the Community and Enterprise Committee (29 August 2023), to
facilitate the upgrade of the public space CCTV system, an allocation of £0.500
million has been made available from the Council’s Shared Prosperity Fund
allocation.  Part of these essential works were required to commence during
2022/2023, with the main improvement works scheduled to start in 2023/2024.   
Approval is sought to increase the 2023/2024 Capital Programme by £0.340 million,
with the remaining £0.160 million being added to the budget in 2024/2025 when
appropriate.     
£0.340m  
Minor Adjustments £0.002m  
TOTAL ADJUSTMENTS (£3.060m) 
21

Page 22

Appendix 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 11 AUGUST 2023 
£m  
Total Base Budget (including carry forward from 2022/2023) 83.322  
Proposed Adjustments – Period 5 (3.060)  
Total Revised Budget 80.262     
2023/24
Budget 
Period 5
Proposed
Adjustments 
Revised
2023/24
Budget
Resource £m £m £m    
Community & Enterprise 42.925 (3.417) 39.508
Education 19.311 0.022 19.333
Finance & Corporate 5.333 - 5.333
Housing & Technical 11.923 0.335 12.258
Social Work 2.030 - 2.030
Other Match Funding 1.800 - 1.800    
TOTAL CAPITAL PROGRAMME 83.322 (3.060) 80.262      
22

Page 23

Appendix 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 11 AUGUST 2023 
2023/24
Original
Estimate inc
C/F 
2023/24
Revised
Budget 
2023/24
Budget to
11/08/23 
2023/24
Actual to
11/08/23     
Expenditure £m £m £m £m     
General Fund Programme 77.849 80.262 15.161 14.654 
Income
2023/24
Budget
2023/24
Revised
Budget 
2023/24
Actual
To
11/08/23         
£m         £m  £m
Prudential Borrowing 24.959 21.351  21.351
Developers Contributions 7.658 8.080  4.225
Partners (Including SPT, Clyde Windfarm
and Transport Scotland)
2.157 3.299  0.549
Scottish Government:     
- Capital Grant 33.985 34.527  10.184 
- Cycling, Walking and Safer
Routes
1.632 2.284  0.000
- Road Safety Improvement 0.000 0.475  0.000 
- Vacant and Derelict Land 2.019 2.019  1.334 
- Regeneration Capital Grant  0.737 1.726  0.745 
- Place Based Investment
Programme
1.510 2.723  2.723
-Inspiring School Age Childcare
Spaces Programme
0.000 0.234  0.000
Glasgow City Region City Deal 0.000 0.000  0.000
Capital Receipts 2.000 2.000  0.006
Specific Reserves 1.192 1.192  1.192
Revenue Contribution 0.000 0.352  0.352     
TOTAL FUNDING 77.849 80.262  42.661 
23

Page 24

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/24
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 11 AUGUST 2023 
2023/24
Original 
Budget  
2023/24
Revised
Budget
2023/24
Budget to
11/08/23
2023/24 
Actual to
11/08/23 
£m £m £m £m
Expenditure 
2023/24 Budget  63.916  69.596  16.115  15.580     
2023/24
Original 
Budget  
2023/24
Revised
Budget 
2023/24
Actual to
11/08/23 
£m £m  £m
Income         
Capital Receipts 0.000 1.683  1.683
Capital Receipts – Land Sales 0.000 0.000  0.005
Capital Funded from Current Revenue 27.162 27.162  8.401
Prudential Borrowing 17.302 23.331  0.000
Scottish Government Specific Grant:    
- New Build 16.632 12.036  5.360
- Open Market Purchase Scheme 2.700 5.264  0.000
- Mortgage to Rent 0.120 0.120  0.131 
63.916 69.596  15.580 
24

Page 25

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Additional Funding from Scottish Government and
Other External Sources 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (16 August 2023)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the additional funding totalling £6.331 million, detailed in Appendices 1 and
2, be noted. 
3. Background
3.1. The Council is periodically advised of additional funding which is made available from
the Scottish Government and other sources to enable various initiatives to be
undertaken. 
3.2. Additional funding may either be paid through the General Revenue Grant mechanism
or by the completion of appropriate grant claims. 
3.3. Details of the additional funding are attached in Appendices 1 and 2 of the report,
Revenue and Capital respectively.  The report details additional funding that has been
reported by Resources as part of the additional resources notification process, as well
as any additional funding that has increased the Council’s budget by more than £0.100
million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £4.857 million has been identified for 2023/2024.   This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £0.989 million has been identified for 2023/2024, with a
further £0.485 million in 2024/2025.  This is detailed in Appendix 2.   
5
25

Page 26

5.3. The total additional funding is, therefore, £6.331 million and Resource budgets will be
updated to reflect this additional funding as required, Where appropriate, details of
spending plans will be presented to Resource Committees for approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
7.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
23 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 16 August 2023 
List of Background Papers
 Additional Funding Reports 27 July 2023 to 23 August 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
26

Page 27

Appendix 1 
Additional Revenue Funding 
Resource  Description  2023/2024
£m 
2024/2025
£m 
Total
£m 
Method
Finance and
Corporate
Resources 
No-one Left Behind – General
Revenue Grant
0.641 - 0.641 Scottish
Government 
Finance and
Corporate
Resources
No-one Left Behind – Retrospective
Grant Claim
3.972 - 3.972 Scottish 
Government
Community and
Enterprise
Resources
Local Air Quality Management
Action Planning Fund / Local Air
Quality Management Grant Fund –
Grant Award
0.244 - 0.244 Scottish 
Government 
TOTAL REVENUE FUNDING 4.857 - 4.857 
27

Page 28

Appendix 2 
Additional Capital Funding 
Resource  Description  2023/2024
£m 
2024/2025
£m 
Total
£m 
Method
Community and
Enterprise
Resources 
Regeneration Capital Grant Fund -
Carnwath Community and Business
Enterprise HUB 
0.275 - 0.275 Scottish
Government
Community and
Enterprise
Resources 
Regeneration Capital Grant Fund -
Carluke High Mill Community
Facility – Phase 1 
0.714 0.485 1.199 Scottish
Government 
TOTAL CAPITAL FUNDING 0.989 0.485 1.474 
28

Page 29

Report
Agenda Item 
1. Purpose of Report
1.1. The purpose of the report is to: - 
 provide an update on the revised range of maximum amounts payable by a
motorist issued with a Penalty Charge Notice (PCN) and to seek approval to
adopt the higher levels. 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): - 
(1) that the contents of this report be noted and the revised amounts payable are
approved and introduced as soon as practicably possible. 
3. Background
3.1. In 1997, South Lanarkshire Council produced a Parking Charter.  Consequently, on-
street waiting and loading restrictions were reviewed and amended to meet the needs
of the people working, living, and visiting the Council’s urban areas. 
3.2. Following extensive investigations and discussions, it was concluded that South
Lanarkshire Council operate a Decriminalised Parking Enforcement (DPE) regime. A
business plan was developed, and the Council gave its approval to proceed with the
introduction of DPE commencing in 2005, taking over the responsibility of enforcement
of waiting and loading restrictions from the Police. 
3.3. Demand management measures (e.g. waiting/loading restrictions and parking
charges) are a recognised tool to keep our transportation network and town centres
operating safely. They ensure junctions are free from parked cars, loading bays, that
businesses can continue to operate effectively, and deliveries can reach their
destination.  Importantly, though, they also assist in encouraging greater use of active/
sustainable travel in place of the private car. 
3.4. Car parking management within town centres is a balance between the supply of
parking facilities, both on and off street, and managing demand for parking to ensure
that accessibility is maintained for all road users to facilitate economic growth and
employment opportunities. 
Executive Committee 
13 September 2023
Executive Director (Community and Enterprise
Resources)
Report to:
Date of
Meeting: Report
Parking – Penalty Charge Notices (PCNs)
CharNnNoticeNoticesManagement Plan
Subject
:
7
29

Page 30

3.5. The Council has the power under civil law to issue a Penalty Charge Notice (PCN) to
a vehicle which contravenes any of the restrictions in place. The process for the
handling of PCNs is statutory in accordance with the Road Traffic Act 1991, as
amended. 
3.6. Currently a penalty charge of £60.00 is issued, however, if payment is made within 14
days from the date of issue, it is reduced by 50% to £30. 
3.7. Should someone wish to appeal the charge formally they must await the Notice to
Owner which will be sent 28 days after the PCN is issued. This will advise the recipient
to make payment of £60.00 or appeal by completing and returning the document or by
using the online appeals portal. If neither is received, the PCN rises to £90, and a
charge certificate is issued. If no payment is received, the case will be passed to the
Sheriff Officer, which incurs further charges. 
4. Penalty Charge Notice (PCN) Amounts
4.1. Local Authority Circular 1/95 “Guidance on Decriminalised Parking Enforcement
outside London” set out the procedures local authorities outside London in England
and Wales must follow when applying for decriminalised parking enforcement powers.
Scottish local authorities have used this guidance when creating decriminalised
parking regimes within their local authority areas. 
4.2. This Circular set out the guidance on the level of charges for Penalty Charges which
were linked with the level of fixed penalty notices for non endorsable parking offences.
The Scottish Government undertook a public consultation which considered the levels
of fines associated with Penalty Charge Notices (PCNs) and published the analysis of
the responses in September 2022. 
4.3. At that time, Scottish Ministers did not feel that it was appropriate to raise the levels
due to the cost of living crisis but committed to keeping that decision under review in
the coming year. Since that decision was made, there have been increased calls from
local authorities and other interested parties asking Scottish Ministers to review that
decision and asking for local authorities be given further fiscal powers to decide if they
wish to increase the levels of PCN, or not, given that rates have not increased for 22
years. 
4.4. Earlier this year, Scottish Ministers issued revised guidance to local authorities in
Scotland with a decriminalised parking regime notifying them of revised levels of the
maximums that can be charged for penalty charges notices. 
4.5. From the 1 April 2023, the lower and higher maximum amounts payable by a motorist
issued with a Penalty Charge Notice (PCN) are shown below shaded grey:- 
Level of PCN Paid within
14 days
Paid between
15 days and
Notice to
Owner
Paid between
Notice to Owner
and Charge
Certificate
Paid After
Service of
Charge
Certificate
Current £30.00 £60.00 £60.00 £90.00
Lower £40.00 £80.00 £80.00 £120.00
Higher £50.00 £100.00 £100.00 £150.00 
30

Page 31

4.6. Given the current financial climate, the Scottish Government urged local authorities to
be aware of the implications this increase may have on members of the public and
advised that local authorities be mindful to use the lower limit where appropriate. 
4.7. However, as town centres seek to recover, post covid, we must ensure that restrictions
are enforced appropriately and effectively and that any deterrents (e.g. PCNs) are
sufficient to ensure continued operation of the enforcement regime and in line with
emerging guidance and legislation. 
4.8. Subsequently, it proposed to set PCN levels at the higher limit as shown in the table
above, meaning a revised discount PCN charge of £50.00 if payment reaches the
Council within 14 days of issue or full payment of £100.00 if made after the 14 days
and within 28 days from the date the PCN was issued. 
4.9. As before, should someone wish to appeal the charge formally, they must await the
Notice to Owner which will be sent 28 days after the PCN issue. This will advise the
recipient to make payment of £100.00 or appeal by completing and returning the
document or by using the online appeals portal.  If neither is received, the PCN rises
to £150 with follow up sheriff officer action necessary. 
4.10. Other councils across Scotland with a DPE regime have already, or are planning to,
implement the same level of revised charges. This includes Edinburgh City, East
Renfrewshire, Argyll and Bute, Angus, Dundee City, Perth and Kinross and Highland
Council. 
5. Employee Implications
5.1. There are no current employee implications associated with this report. 
6. Financial Implications
6.1. The total budgeted income for 2023/24 associated with PCN income for the current
year is approximately £2,460,000. This is formed of income associated with Penalty
Charge Notices, Parking Charges (both on and off street), season tickets and
management of private parking areas. The most recent forecasted shortfall is
approximately £0.800 million.  This shortfall, due to several reasons including reduced
demand across our town centres, is being monitored and managed with support from
central budgets associated with covid recovery. 
6.2. The adoption of the higher maximum PCN amounts payable by a motorist is expected
to assist in managing the shortfall as well as acting as a more significant deterrent for
those motorists contravening those restrictions. It is difficult to definitively predict what
such an increase in PCN amount is likely to achieve, but a figure in the range of £0.100
to £0.200 million is not unrealistic across a full financial year. 
6.3. We are also continuing to assess parking demands across our town centres, post
covid, and consideration is being given to the level of parking tariffs currently in place
and this is expected to be reported to a future committee. 
7. Climate Change, Sustainability and Environmental Implications
7.1. While there are no defined environmental implications or implications for sustainability
in terms of the information contained within this report, failure to have effective demand
management measures in place across our towns could see the use of the private car
begin to increase at the expense of more active/sustainable modes. 
31

Page 32

8. Other Implications
8.1. There are no other implications or risks in relation to the information contained within
this report. 
9. Equality Impact Arrangements and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
David Booth
Executive Director (Community and Enterprise Resources) 
24 August 2023 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open, and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact: 
Colin Park, Head of Roads, Transportation and Fleet Services
Tel:  07795 090 494
E-mail:  colin.park@southlanarkshire.gov.uk
32

Page 33

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject:    Council Complaints Report: 
SPSO Annual Overview 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide a report on the performance of the Council’s handling of complaints
received during the period 1 April 2022 to 31 March 2023 against the Scottish
Public Services Ombudsman (SPSO) national indicators.
 identify improvement activity as a result of the analysis of complaints (see
Appendix 1)
 provide customer feedback on complaint handling (see Appendix 2) 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that complaints performance and areas highlighted for improvement be noted. 
3. Background
3.1. The Council is required to monitor and assess complaints handling performance to
provide assurance in relation to how we have performed; to facilitate continuous
improvement; and to assist in benchmarking performance between local authorities. 
The performance indicators for the local authority model complaints handling
procedure are the minimum requirements for a local authority to self-assess and
report on performance and to undertake benchmarking activities.       
3.2.  Compliance with the procedure is monitored by the SPSO. 
4. Overview 
4.1. The Corporate Management Team receive regular quarterly reports on Council
complaints and an annual report is shared with elected members. We continue to
work to improve our performance and learn from complaints to improve our services. 
4.2. The SPSO introduced a suite of performance indicators which the Council is required
to report against following the introduction of the new Complaints Handling
Procedure. These are:-   
Indicator 1 -  Complaints received per 1000 of population.  
Indicator 2 -  % of closed complaints at each stage.
Indicator 3 -  Average time in working days to respond to complaints at each 
Stage.  
Indicator 4 -  % of complaints upheld, not upheld, and resolved.
8
33

Page 34

5. Indicator performance
5.1. As per the 2011 census, South Lanarkshire currently has a population of just over
322,630 people. These are the latest available census figures. The results of the
2022 census are expected towards the end of 2023. In the period April 2022 to
March 2023, a total of 1069 complaints were received. This means there were 3.3
complaints received for every 1000 head of population compared to 2021/22 where
complaints were 3.2 per 1000 head of population. The Complaints received in this
period are detailed in Table 1 (SPSO indicator 1). 
5.2. To allow a more realistic comparison, there were 2.9 complaints received for every
1000 head of population in 2019/20 which was before the pandemic. 
Table 1 
Total* number of complaints received – Four-year comparison
Year
2019/20
Year 
2020/21
Year 
2021/22
Year 
2022/23
% Change in
last year
910 914 1046 1069 2.2% 
*Figures for the total number of complaints received do not include complaints that
were categorised as withdrawn or created in error. For 2022/23, 11 complaints were
withdrawn or had been created in error. 
5.3. The Complaints closed in this period (SPSO indicator 2), are detailed by Resource in
Table 2 of Appendix 1. The figures are shown as a percentage of all complaints
recorded in the CRM, EDRMS, Flare, Confirm and Objective systems. Overall, they
show that: 
 84% of complaints received are closed at Stage 1, i.e. within 5 working days
 5% are closed at Stage 2 i.e. within 20 working days
 11% have been escalated from Stage 1 to Stage 2 and closed 
5.4. The Complaints Handling Procedure states that Stage 1 complaints are responded to
within 5 working days, and Stage 2 within 20 working days. 
The average time in working days to respond to complaints (SPSO indicator 3), is
detailed by Resource in table 3 of Appendix 1. For the period 2022-2023 in South
Lanarkshire, the average number of days to respond at Stage 1 is 4.47 working days
and for Stage 2 is 10.67 working days. 
Response times are within the recommended timescales of the Complaints Handling
Procedures. 
These working day statistics show a slight decline in performance from the 2021/22
results where the average working days to respond to Stage 1 was 4.11 and Stage 2
was 10.5.   
5.5. The tables in Appendix 1 show that Housing and Technical Resources on average
dealt with Stage 1 complaints within 6.50 working days and Community and
Enterprise within 6.25 working days. 
Potential factors in failing to meet the 5 working day timescale may be due to issues
where more detailed investigation is required. Complaints of a complex nature would
34

Page 35

be likely to take longer. Confidence in managers to recognise the need for more
complex investigations and escalate complaints directly to Stage 2 should be
encouraged at an early stage to allow the necessary time to investigate and respond. 
It is recommended that these results are cascaded to Resource Heads and to
Resource Complaints Champions. This will allow an action plan to make
improvements to the timescales, and to maintain employee awareness of the options
available in the procedure for escalating complaints. 
The figures presented in Appendix 1 show specific areas for improvement at
Resource level. It should be noted that, where most complaints are processed at
Stage 2, performance is well within the timescales. 
The lack of a single recording system across Resources continues to create an
element of delay and is an area for improvement. Development of Objective is
continuing and as part of the next planned upgrade, a change will be included. This
will produce reports that show performance against the SPSO indicators and
dispense with the current manual exercise. 
5.6. Resources can move complaints directly to Stage 2 if it is appropriate rather than
escalating from Stage 1 to Stage 2. 116 complaints were escalated this year
compared to 101 in 2021/22, an increase of 14.9%. Managers should ensure that
employees are encouraged to progress more complex complaints directly to Stage 2
to allow adequate time to investigate thoroughly and respond. 
The purpose of the 2-stage procedure is to handle complaints effectively first time
and not need multiple attempts at resolving complaints. Where a complaint is
escalated to the SPSO, they are interested in whether the correct procedure has
been followed. 
5.7. The Complaints upheld/not upheld at each stage as a percentage of complaints
closed in full at each stage in this period (SPSO indicator 4), are detailed by
Resource in tables 4 of Appendix 1. 
Of the complaints processed: 
At Stage 1, 32% of complaints are upheld, with 46% of complaints not upheld. 
At Stage 2, 23% of complaints are upheld, with 77% of complaints not upheld. 
Of the complaints that were escalated from Stage 1 to Stage 2, 24% of complaints
are upheld, with 76% of complaints not upheld. 
In terms of upheld complaints across the Resources, most Stage 1 complaints are
upheld in Community and Enterprise Resources, 47% of all Stage 1 complaints, and
fewest were upheld in Education Resources, 19% of all Stage 1 complaints. 
Of the 1047 complaints closed in 2022/23, 191 were resolved at Stage 1. The
Resource with the most resolved complaints at Stage 1 is Social Work Resources
with 70.
35

Page 36

6. Good Practice Examples
6.1. Good practice examples from across Resources are highlighted on a quarterly basis
and published on the Complaints Performance pages of the Council website. These
are detailed in Appendix 1. 
7.  Customer Satisfaction  
7.1. We ask for feedback from customers who have used our complaints procedure. 
This gives us insight into how the customer feels about how we have handled their
complaint and helps to inform service improvements. As in previous years, the
survey has been conducted by email with all customers who agree to participate sent
a link to the survey. This is in line with the complaints handling procedure.   
Appendix 2 provides details of the respondents’ feedback for the period from 1 April
2022 to 31 March 2023. 
7.2. The key points to note from the customer survey results are as follows: 
 100% of respondents knew that the Council had a complaints process and 33%
found it easy to make their complaint. 67% said that they would be willing to use
the process again.
 100% of the respondents felt that the explanation given on how the Council
reached their decision was not full and clear. 0% were satisfied with the
outcome of their complaint.
 100% of the surveys related to Housing and Technical Resources. 
 Customers scored the Council on how well employees had dealt with their
complaint in terms of their knowledge as 0%, their friendliness 0% and their
understanding of the complaint 0%. 
8. SPSO Update 
8.1. Child Friendly Complaints 
The SPSO is currently working on a new approach to handling complaints that
involve children. They are doing this by working with children and young people from
a range of backgrounds, and from across Scotland, to co-design this new approach
and ensure it is a system fit for purpose. They have also enlisted the help of a wide
range of parents, advocates and professionals that work with children in the public
sector, to test and refine the approach and ensure it will work in a practical setting. 
The SPSO have a first draft of a guide for use by all public bodies under their remit.
This sets out how existing complaints processes can be adapted when a child or
young person is involved. It aims to ensure that rights under the UNCRC are met
throughout the complaints process. It also sets out how concerns of children and
young people are handled in a way that they have indicated meets their needs.
Focus is on key services provided to children and young people, such as schools,
social work services and children’s health services. The aim of this work will be to
test the new approach in practical settings, both to ensure it results in the right
outcomes for children, and that it is efficient, practical and workable for the public
sector bodies managing the process.
The SPSO will hold a full public consultation before publication of the final guidance. 
This will take place after the pilots are complete and any changes made. They are
still in the process of refining the pilot and will provide further updates on the timeline
and launch when they have definite dates. 
36

Page 37

8.2. Annual Statistics 2021-22
SPSO publish their annual statistics on their website. These detail the enquiries and
complaints they have received and determined in the past year. The full statistics are
available on the SPSO website at Statistics | SPSO 
9. Employee Implications
9.1. Employees are key to effective service delivery and in trying to resolve complaints.
Training is available to all employees through a range of methods including full
handbooks, quick guides, e-learning, and good practice. 
10. Financial Implications
10.1. There are no additional financial implications. 
11. Climate Change, Sustainability and Environmental Implications
11.1 There are no climate change, sustainability or environmental implications associated
with this report. 
12. Other Implications
12.1. There is a risk of damage to the Council’s reputation. If complaints are not handled
effectively, there can be an adverse effect on the public perception of the Council
which can lead to a lack of trust in the services provided. 
13. Equality Impact Assessment and Consultation Arrangements
13.1. Council Resources have been consulted on the data required for this report.
Customers are consulted on the process every quarter and the result of the
consultation is shared through this report. 
13.2. There is no requirement to carry out an equality impact assessment in relation to the
proposals within this report. However, the learning from complaints is used to ensure
Council services are accessible to all members of the community and, wherever
possible, to prevent discrimination, harassment, or victimisation from occurring. 
Paul Manning 
Executive Director (Finance and Corporate Resources) 
18 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Fair, open, and sustainable
 Ambitious, self-aware, and improving 
Previous References
 None 
List of Background Papers
 Monitoring information provided by each Resource
 Complaints handling customer feedback report 
37

Page 38

List of Appendices
 Appendix 1 – Scottish Public Services Ombudsman’s Performance indicators from 1
April 2022 to 31 March 2023
 Appendix 2 - Overview of responses for the complaints handling customer feedback
survey from 1 April 2022 to 31 March 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Gill Bhatti, Employee Development and Diversity Manager
Ext: 4330 (Tel: 01698 454330)
Email:  gill.bhatti@southlanarkshire.gov.uk 
38

Page 39

Appendix 1 
SPSO performance indicators (KPI’s) from 1 April 2022 to 31 March 2023 
Complaints closed at stage one and stage two as a percentage of all complaints
closed (SPSO indicator 2). Actual numerical figure shown in brackets. 
The term “closed” refers to a complaint that has had a response sent to the  
customer and at the time no further action is required (regardless at which stage it 
is processed and whether any further escalation takes place). 
Table 2 
Resource (total no. closed) % closed at
Stage 1
% closed at
Stage 2
% closed at
Stage 2 -
escalated from
Stage 1 
Community and Enterprise (289) 87% (251) 5% (15) 8% (23)
Education (288) 86% (247) 5% (14) 9% (27)
Finance and Corporate (90) 72% (65) 3% (3) 24% (22)
Housing and Technical (162) 83% (135) 2% (3) 15% (24)
Social Work (218) 83% (180) 8% (18) 9% (20)
Total (1047) 84% (878) 5% (53) 11% (116) 
Average time in working days for a full response to complaints at each stage
(working days) (SPSO indicator 3) 
Table 3 
Resource  Average time in
working days to
respond to
complaints at
stage one (5-day
resolution target) 
Average time in
working days to
respond to
complaints at
stage two (20-
day resolution
target)
Average time in
working days to
respond to
complaints after
escalation (20-
day resolution
target)
Community and Enterprise  6.25 15 13
Education  4.75 17.25 16.25
Finance and Corporate  1 1 8
Housing and Technical  6.5 1 14.75
Social Work  4.25 19 19.75
Total Average Times 4.47 10.67 14.40 
39

Page 40

Four-year comparison 
Average time in working days for a full response to complaints at each stage. 
Average times Stage 1 Stage 2 Escalated
Total - 2022/23 4.47 10.67 14.40
Total - 2021/22 4.11 10.50 12.43
Total - 2020/21 5.37 10.72 12.76
Total - 2019/20 4.66 11.57 11.91 
Complaints upheld/not upheld at each stage as a percentage of complaints closed in
full at each stage, (SPSO indicator 4). Actual numerical figure shown in brackets.
(See table 2 for complaints closed figures). 
Upheld complaints – where the Council is at fault.
Not upheld complaints – where the Council is not at fault. 
Table 4 
Resource  % upheld at
Stage 1
% not upheld at
Stage 1
% upheld at
Stage 2
% not upheld at
Stage 2
Community
and Enterprise
47% (117) 46% (116) 20% (3) 80% (12)
Education 19% (46) 57% (141) 29% (4) 71% (10)
Finance and
Corporate 
37% (24) 55% (36) 0% (0) 100% (3)
Housing and
Technical
29% (39) 43% (58) 0% (0) 100% (3)
Social Work 31% (56) 30% (54) 28% (5) 72% (13)
Total  32% (282)  46% (405) 23% (12)  77% (41) 
Resource  % of escalated complaints
upheld
% of escalated complaints
not upheld
Community and Enterprise 26% (6) 74% (17)
Education 26% (7) 74% (20)
Finance and Corporate 18% (4) 82% (18)
Housing and Technical 4% (1) 96% (23)
Social Work 45% (9) 55% (11)
Total  24% (27) 76% (89) 
40

Page 41

Resolved complaints – when both the Council and the Customer agree what action (if
any) will be taken to provide full and final resolution for the customer. 
Resource  Number of complaints resolved at stage one as % of all
complaints closed at stage one (5 days)
Community and Enterprise 7% (18)
Education 24% (60)
Finance and Corporate 8% (5)
Housing and Technical 28% (38)
Social Work 39% (70)
Total  22% (191) 
Statement outlining changes or improvements to services or procedures as a result
of the consideration of complaints. 
Learning outcomes from complaints
Complaints Performance - you said we did information 
The following information is provided by Resource complaints contacts each quarter
for inclusion in Quarterly and Annual complaints monitoring reports. 
Community and Enterprise. 
Customer booked a slot at the local civic amenity site when they arrived it was closed. 
The Service apologised and advised that it was a public holiday and that was why the site
was closed. The booking parameters on the system have been updated to take account of
public holidays. 
Now that public holidays have been entered into the booking parameters for booking a slot
at the civic amenity site will not happen again, improving the service. 
Complaint received regarding the waste bin collection service, in particular the burgundy
garden/food waste bin, not being provided for resident’s street. 
We apologised for the inconvenience caused and advised that we have had a reduced fleet
due to difficulties we have been experiencing with delays in parts being shipped from
Europe nevertheless we have managed to maintain our collection programmes schedule. 
The complainants’ case has been discussed with the supervisor for the area and will be
monitored in the coming weeks to ensure that the bins are collected as programmed. 
Customer not happy as the information on the council website was misleading in relation to
disposal arrangements for real Christmas trees. The website said the council would collect
real Christmas trees placed beside the burgundy food and garden waste bin. The bin was
emptied but the tree was not collected. Customer checked the website again and noted that
41

Page 42

it had been updated to say that trees should be cut down to 5-foot sections and tied
together. 
We apologised and advised that we had realised that the information about cutting the tree
to 5-foot sections was missing from the information on the web page, this was added as
soon as the error was identified. 
We will make sure that the information uploaded on the council website is accurate. 
Education. 
Parent stated that daughter was given water to drink after sustaining an injury in the
playground. 
Parent was unhappy as daughter had to go to hospital and if she had required surgery, she
would not have been able to get it due to drinking fluids. Parent asking that staff are
reminded of general first aid and reminded no fluids are given until seen by a first aider. 
Staff have been reminded of first aid procedures to ensure this does not happen again. 
Various school transport buses did not turn up at beginning of term to pick pupils up to take
them to school. 
Apology given to parents along with explanation that due to issues with contractor and
driver availability across west and central Scotland, Strathclyde Partnership were unable to
secure some contracts to take pupils to and from school or the contracts were allocated last
minute and had capacity issues. 
A long-term strategy has been put in place with our partners. 
Nursery child who has a food allergy was given food that they have an allergy to.  
A full investigation was carried out and as a result the establishment revised their policy and
put measures in place to minimise an incident of this kind happening again. 
Establishment to follow new measures put in place. 
No staff on premises on a certain date between 9am and 10am with appropriate NHS
training on relation to insulin pump and glucose monitoring. 
The head of the centre has contacted the diabetic nurse to request training for the
remainder of staff team. 
The establishment will ensure rotas allow for an appropriately trained staff to be always on
duty. 
Finance – Transactions. 
A customer made contact to advise response not received to their enquiry in the timescales
given by a member of staff. They had been advised they would be contacted by telephone
within 48 hours. Upon further contact the customer was informed that they had been given
incorrect response timescale.
42

Page 43

Apologised to customer and team provided with reminder on timescales for enquiry types. 
Customer raised complaint following issues they had making a payment for a service using
a Mastercard payment card. Customer had tried several times over a period of 3 weeks. 
Raised issue with merchant and worked with them to resolve the issues regarding
Mastercard payments being made to SLC. Apologised to customer, explained the situation,
and arranged for a call-back on a secure line for payment to be taken manually by
telephone. 
Customers can now again use Mastercard to make a payment now that issue with
merchant has been resolved. 
Customer was not happy with how Council Tax arrears situation had been dealt with.  
Spoke to customer in detail and explained process, identified an earlier opportunity where
customer could have been contacted before sending to Stirling Park for ending liability date
cases. 
Identify earlier the opportunity to contact customer prior to sending to Stirling Park. 
Customer contacted council by phone to make enquiry about lead pipes. Selected
interactive voice response (IVR) option for problems with water and was advised to contact
Scottish Water and call ended. Phoned back and selected different option to speak with
advisor. Not happy about the phone set up, lack of information on website about lead pipes
and available grants. 
Telephoned customer to explain IVR and reason we have it. Explained why we re-direct
customers Scottish Water and spoke to Digital to ask if information on lead pipes and
available grants can be made available on website. 
Finance 
A complaint was received in relation to marriage notices which were sent to the civil
ceremonies mailbox and an auto reply acknowledgement was issued. When the customer
contacted the office in relation to the upcoming ceremony the member of staff dealing with
the matter advised that the documents had not been received, as these could not be found
in the mailbox or in our file and thought that there was possibly an IT issue. When further
checks were conducted by a Team Leader the documents were located.  
Head of Service contacted the customer and apologised for the misunderstanding as
emails had been located.
Procedures reviewed. Staff reminded on how to conduct a search for emails on Outlook and
to speak to Team Leader if any issues.
43

Page 44

Housing and Property Services. 
Customer unhappy with the way her housing application is getting dealt with. 
Staff to be briefed on checking previous records surrounding an applicant’s circumstances
to assess the most appropriate type of appointment. 
Senior Management Team continue to review complaints received and Reflective Learning
sessions carried out.
Customer unhappy at call back not received. Customer was advised that officer would call
him back, officer failed to do so. 
Staff reminded of customer care standards on returning calls.  
Complaints continue to be monitored and performance review by Management. 
Customer dissatisfied that he had no response to a request for compensation for additional
cost incurred because of being decanted from his property for repairs to be carried out.  
Firstly, we apologised to the Customer for the lack of response regarding his request, and
compensation has been given. The service provided falls below the standards expected
and because of these immediate changes have been implemented. 
Monthly stats are provided to Senior Management Team and actions monitored. 
Customer unhappy on how medical appeal has been processed. 
Firstly, we apologised to the customer and Staff reminded of timescales and customer
service standards. 
Monthly reports provided to Service Management Teams and continue to remind staff of
timescales and customer service standards. 
Social Work. 
Customer unhappy with care at home as they were not advised when there was a change
to the visit times and the level of support given. 
Customer was contacted and an apology was given. The customers concerns have now
been resolved and a review of the service was carried out. 
A new scheduling system has been introduced and staff can now update any changes. All
care at home staff have been trained on how to use the system and arrangements are in
place to notify service users of any changes to carers or visit times. 
Complainant unhappy with level of communication and delay processing request. 
Contact was made immediately with the complainant and an apology was given.
Arrangements were made for a worker to be allocated to take forward the request and to be
the point of contact. Contact routes and details were provided to ensure the complainant
was able to speak with someone when required. The delays have been investigated to
44

Page 45

understand why there was a delay. Good/appropriate levels of communication were
discussed with the team to ensure everyone was aware of the expected standards. 
Good communication is important within the Resource and the corporate standards
employee guidance has been re-issued to staff to highlight the importance of effective
communication. It is expected that staff will adhere to the guidance, therefore,
communication will improve.
Customer unhappy with the allocation of the carers budget following a review. The family
are feeling frustrated with process and delays this is causing. 
An apology was given, and the allocated worker continued to work with the family to
complete an Adult Carer Support Plan to ensure these needs are met. 
To keep the customer updated with any delays or outcomes while carrying out the review
process. 
Customer was unhappy with the length of time and delays in carrying out an assessment. 
An apology was given to the customer and the service agreed to set up a home visit to
progress. The purpose of the visit was to review the support plan and to identify support or
services as required for the customer. 
The importance of communication was highlighted to staff. Also, a reminder to keep
customers informed of any updates / delays. It was also highlighted to workers the
importance to ensure assessments are completed within the appropriate timescales to
avoid any delays / distress to service users and their families.
45

Page 46

Appendix 2 
Complaints handling customer feedback survey. 
Overview of responses from 1 April 2022 to 31 March 2023 
Note: data based on 3 respondents 
Question  Responses
Aware that the Council had a complaints process 100%
Satisfied with the ease of making their complaint 33%
Satisfied with the information and advice provided by employees 0%
Satisfied with how well they were kept informed about the progress of their
complaint
0%
Satisfied with the speed with which their complaint was dealt with 0%
Satisfied with the response/explanation received 0%
Satisfied with how the complaint was handled overall 0%
The explanation given of how the decision was reached in the response was full
and clear
0%
Satisfied with the outcome of the complaint 0%
Reason for dissatisfaction with Council’s decision: 
• How the complaint was handled
• How the outcome of the complaint was communicated
• Other reason (shown below)
:
• They missed out key information and I am still waiting on when they will
remove the cavity wall insulation.
• Incompetent staff, constant lies and covering for each other. Making up new
parts of complaints procedure to suit themselves. 
33%
0%
67%
Felt treated fairly and sensitively.  0%
Customers were asked to rate the following in terms of how employees dealt with
their complaint. The % is the number of customers who rated excellent or good:
• Knowledge of Council employees
• Friendliness of Council employees
• How well Council employees understood the complaint 
0%
0%
0%
Complaints process easy to use 33%
How willing would you be to make another complaint in the future if the need
arises?
67%     
46