Agenda Document Pack - Executive Committee - 16/08/2023

South Lanarkshire Council · 16 August 2023
Back to Executive Committee — 16 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 08 August 2023 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 16 August 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson,
Robert Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper,
Andrea Cowan, Maureen Devlin, Gladys Ferguson-Miller, Lynsey Hamilton, Mark Horsham,
Eileen Logan, Katy Loudon, Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny
McCreary, Lesley McDonald, Mark McGeever, Davie McLachlan, Richard Nelson, Mo
Razzaq, Kirsten Robb, John Ross, David Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Elise Frame, Graeme
Horne, Martin Hose, Susan Kerr, Ross Lambie, Elaine McDougall, Norman Rae, Graham
Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 21 June 2023
submitted for approval as a correct record.  (Copy attached) 
5 - 18 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 1 April 2023 to 14 July 2023
Report dated 26 July 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
19 - 24 
4 Capital Budget 2023/2024 and Monitoring for Period 4 - 1 April 2023 to 14
July 2023
Report dated 26 July 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
25 - 32 
5 Additional Funding from Scottish Government and Other External Sources
Report dated 27 July 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
33 - 36 
Item(s) for Decision 
6 Cost of Living – Support
Report dated 4 July 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
37 - 48 
7 Job Evaluation – Back Pay
Report dated 26 June 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
49 - 54 
8 Land and Property Transfers and Disposals
Report dated 20 July 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
55 - 60 
9 South Lanarkshire Council Response to Pre-budget Scrutiny Call for
Evidence on Sustainability of Scotland’s Finances
Report dated 1 August 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
61 - 76 
Item(s) for Noting 
10  Glasgow City Region City Deal – A72 Lanark Road  M74 Junction 7
Signalisation – Revised Full Business Case
Report dated 27 July 2023 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
77 - 84 
Urgent Business 
2

Page 3

11  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 21 June 2023 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Margaret Cowie
(substitute for Councillor Mo Razzaq), Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller,
Councillor Lynsey Hamilton, Councillor Mark Horsham, Councillor Ross Lambie (substitute for
Councillor Richard Nelson), Councillor Eileen Logan, Councillor Katy Loudon, Councillor Hugh
Macdonald, Councillor Ian McAllan, Councillor Catherine McClymont, Councillor Kenny McCreary,
Councillor Lesley McDonald, Councillor Mark McGeever, Councillor Davie McLachlan, Councillor
Kirsten Robb, Councillor John Ross, Councillor David Shearer, Councillor Margaret B Walker 
Councillors' Apologies:
Councillor Richard Nelson, Councillor Mo Razzaq 
Attending:
Chief Executive’s Service
C Sneddon, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development
Education Resources
C McKenzie, Executive Director
Finance and Corporate Resources
P Manning, Executive Director; T Little, Head of Communications and Strategy; G McCann, Head of
Administration and Legal Services; P MacRae, Administration Adviser; K McLeod, Administration
Assistant; M Milne, Head of Personnel Services
Housing and Technical Resources
S Gibson, Executive Director
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
Order of Business
The Committee decided: that the items of business be dealt with in the order minuted
below. 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 17 May 2023 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.
2
5

Page 6

3 Revenue Budget Year End 2022/2023 
A report dated 12 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April 2022 to 31 March 2023. 
The Council’s overall probable outturn position for the year, including approved transfers to
reserves, was reported to the meeting of the Executive Committee held on 1 February 2023 as
an underspend of £4.969 million.  This assumed underspend of £4.696 million on the Council’s
General Services would be transferred to reserves, resulting in a forecast breakeven position for
the year. 
Across Resources, Corporate Items and Council Tax, the year end position was an underspend
of £3.966 million.  This was after proposed transfers to reserves and was in addition to the £4.696
million reported as part of the probable outturn.  Details of the year end position were provided in
appendices 1 and 2 to the report.  The year end underspend of £3.966 million included total
transfers to reserves of £47.334 million.  This included the transfers to reserves approved as part
of the Probable Outturn (£39.111 million) adjusted for movements totalling £0.302 million to reflect
the final position.  The revisions to the Probable Outturn transfers were shown in Appendix 3 to
the report, giving a total of £30.009 million for Probable Outturn transfers.  Additional transfers to
reserves proposed at year end totalled £8.325 million.  This reflected carry forward of funding in
reserves to allow committed areas of spend to be incurred in 2023/2024.  Details of those
additional proposed transfers were given in Appendix 4 of the report.  It was proposed that the
£3.966 million underspend be used to meet future budget pressures and, if this proposal was
approved, those monies would be transferred to reserves, resulting in a breakeven position for
the financial year 2022/2023. 
The outcome of the Job Evaluation Exercise for Home Carers would result in significant recurring
costs for the Care at Home service, which was delegated to the Integration Joint Board (IJB), in
2023/2024 and beyond.  The costs of grade changes, estimated to be in the region of £7 million,
were not included in the budget set by the IJB.  Details were provided on the process set out in
the IJB’s Financial Regulations and Integration Scheme for such an eventuality.  The financial
position for both the IJB and Council partner indicated significant ongoing budget gaps and it was
likely that any recovery plan identified would require changes to the services commissioned by
the IJB.  At its meeting on1 February 2023, the Committee agreed that an underspend on core
funding from the Council to the IJB would be dealt with as overfunding in year and the resultant
underspend was presented as a transfer to reserves of £5.635 million.  Since then, following a
decision taken by the Council, at its meeting on 24 May 2023, to a review being undertaken of the
implementation date of the outcome of the Home Carers’ Job Evaluation, a basis had been
established for back dating implementation to October 2020.  Those costs would require to be
included in the financial position for 2022/2023.  As a result, it would not now be possible to
implement the decision taken by the Executive Committee to claw back the non-recurring
underspend from the IJB of £5.635 million as the IJB would not now underspend and that funding
would no longer be available.  Other funding would require to be identified to help with Children
and Families costs into 2023/2024 and it was proposed that the additional underspend of £3.966
million be considered as a means of contributing towards meeting those costs, together with
residual Covid funding held in the Council’s reserves.  Due to the timing of the result of the review,
full costs and the funding package would require to be quantified and a report on this matter would
be submitted to the meeting of the Committee to be held on 16 August 2023. 
As at 31 March 2023, the position on the Housing Revenue Account was breakeven.  This was
after a transfer to the Housing Revenue Account reserves of £3.990 million, which was £0.490
million higher than budgeted, as detailed in Appendix 5 to the report. 
Officers and the Chair responded to members’ questions on various aspects of the report. 
6

Page 7

The Committee decided: 
(1) that across Resources, Corporate Items and Council Tax, an additional year end
underspend of £3.966 million after proposed transfers to reserves, as detailed in section 4
and Appendix 1 of the report, be noted; 
(2) that it be noted that the probable outturn transfers approved by members had been revised
to £39.009 million, previously £39.311 million, as detailed in Appendix 3 of the report; 
(3) that the Resources’ requests for transfers to reserves to spend on commitments against
specific streams of funding during the final part of the year, totalling £8.325 million, as
detailed in Appendix 4 of the report, be approved; 
(4) that the overfunding position on the IJB contribution, as detailed at section 4.5 of the report,
be noted; 
(5) that approval be given for the £3.966 million underspend, after proposed transfers to
reserves, to be transferred to reserves and used to fund future budget pressures, as detailed
in section 4.13 of the report; 
(6) that it be noted that, following the transfer to reserves of £3.966 million, as detailed in
recommendation 5, the result would be a breakeven position for the Council; 
(7) that the position regarding the recurring costs in relation to the Home Carers’ Job Evaluation
exercise, (section 5.1 to 5.4 of the report) be noted; 
(8) that it be noted that the outcome of the review on Home Carers’ job evaluation had now
been reached, and that a full paper covering expenditure and funding would be presented
to the Committee in August 2023 (section 5.5 to 5.7 of the report); 
(9) that it be noted that the clawback of underspend from the IJB would not be possible, and
that approval be given for the alternate funds identified to contribute towards Children and
Families costs in 2023/2024, as detailed in section 5.6 of the report; and 
(10) that the breakeven position on the Housing Revenue Account (section 6) be noted. 
[Reference: Minutes of 1 February 2023 (Paragraph 3) and Minutes of South Lanarkshire Council
of 24 May 2023 (Paragraph 2)] 
4 Revenue Budget Monitoring for Period 2 1 April to 19 May 2023 
A report dated 2 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April to 19 May 2023. 
At 19 May 2023, the position on the General Fund Revenue Account was breakeven.   
Details were given on adjustments in relation to the following which had been included in the
figures contained in Appendix 1 to the report:- 
 loans fund review
 loan charges
 2023/2024 investments  
7

Page 8

Details were also given on:- 
 proposals in relation to residual covid funding
 the position following the outcome of the Job Evaluation exercise for Home Carers   
Appendix 2 to the report showed that, at 19 May 2023, there was a breakeven position against
the phased budget on the Housing Revenue Account. 
The Committee decided: 
(1) that the breakeven position on the General Fund Revenue Account at 19 May 2023, as
detailed in section 4 and Appendix 1 of the report, be noted; and 
(2) that the breakeven position on the Housing Revenue Account at 19 May 2023, as detailed
in section 5 and Appendix 2 of the report, be noted. 
5 Capital Budget Monitoring Final Outturn 2022/2023 
A report dated 2 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 the outturn position of the General Services and Housing Capital Programmes for the year
ended 31 March 2023
 projects, expressed in financial terms, which had been carried forward into 2023/2024 
The total spend on the General Services Capital Programme 2022/2023, as detailed in Appendix
1 to the report, amounted to £65.736 million.  This compared to the budget of £78.396 million and
resulted in an underspend of £12.660 million.  This would be carried forward to the 2023/2024
financial year.  The programme underspend was due to the timing of project spend and the main
projects responsible for the underspend were detailed in the report and at Appendix 2.  The
majority of those projects would continue into 2023/2024.  Details were also given of year end and
accounting adjustments. 
The Housing Capital Programme 2022/2023, as detailed in Appendix 3 to the report, totalled
£66.361 million.  The actual expenditure on the Housing programme amounted to £60.695 million,
a net underspend of £5.666 million.  Details were given on the reasons for the underspend.  Taking
into account the underspend position of £5.666 million and additional one-off income totalling
£2.415 million, resulted in a carry forward of £8.081 million.  This would be added into the Capital
Programme when the spend profile had been finalised. 
The Committee decided: 
(1) that the outturn on the 2022/2023 General Services Programme of £65.736 million, as
detailed in section 4.1 of the report, be noted; 
(2) that approval be given for £12.660 million of General Services Capital Programme to be
carried forward into 2023/2024, as detailed in section 4.2 of the report, be approved; 
(3) that the outturn on the 2022/2023 Housing Capital Programme of £60.695 million, as
detailed in section 4.7 of the report, be noted; 
(4) that the £8.081 million of Housing Capital Programme to be carried forward into future years’,
as detailed in section 4.9 of the report, be approved; and  
8

Page 9

(5) that it be noted that the level of overall spend anticipated in 2023/2024, for both the General
Services and Housing Capital Programmes, would be the subject of a separate report to the
Committee. 
6 Capital Budget 2023/2024 and Monitoring for Period 2 - 1 April to 19 May 2023 
A report dated 7 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 consolidation of capital budget monitoring to give a Council-wide summary of the 2023/2024
Capital Programme including 2022/2023 carry forward  
 progress on the Capital Programme for the period 1 April to 19 May 2023 
At its meeting on 22 February 2023, the Council agreed a General Services base budget for
2023/2024 amounting to £91.061 million.  Since the approval of this programme, the financial year
end and additional funding received had resulted in a revised General Services base budget
position for 2023/2024 of £77.849 million, as detailed in appendices 3 and 4 to the report. 
Since the budget was approved in February 2023, additional funding of £4.141 million had been
awarded to the Council.  In addition, it was proposed that funding from the Shared Prosperity Fund
and developer contributions already received be added to the programme.  A detailed breakdown
of those proposals was provided in Appendix 2 to the report and, if approved, the total capital
spending programme for 2023/2024 would be £81.990 million. 
Appendix 4 summarised the programme spend and funding for the General Fund.  Budget for the
period amounted to £2.048 million and, at 19 May 2023, £2.048 million had been spent on the
General Fund Capital Programme. 
The Housing Capital Programme for 2023/2024 amounted to £63.916 million.  Programmed
funding for the year also amounted to £63.916 million.  The funding sources were detailed in
Appendix 5 to the report.  Budget for the period amounted to £6.337 million and, at 19 May 2023,
£6.337 million had been spent on the Housing Capital Programme. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
Officers responded to a member’s questions on the report. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, detailed in appendices 3 and 4,
and the Housing Capital Programme, at Appendix 5 of the report, be approved; 
(2) that the adjustments to the General Fund programme, listed at Appendix 2 to the report, be
approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of South Lanarkshire Council of 22 February 2023 (Paragraph 2) and
Minutes of 29 March 2023 (Paragraph 4)]  
9

Page 10

7 Additional Funding from Scottish Government and Other External Sources 
A report dated 1 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on additional funding for 2023/2024, totalling £2.995 million, which had been made
available to the Council by the Scottish Government and other external sources.  Further funding
had been agreed in-principle for 2024/2025 and 2025/2026 (£1.213 million per annum) which
reflected the total additional funding of £5.421 million. 
The funding had been allocated as follows:- 
Capital Funding 
Resource 2023/2024 2024/2025 2024/2025 
(£m) (£m) (£m) 
Community and Enterprise 2.995 1.213 1.213 
Total 2.995 1.213 1.213 
Overall Total £5.421 
The Committee decided: that the report be noted. 
[Reference: Minutes of 17 May 2023 (Paragraph 3)] 
8 2024/2025 Revenue Budget 
A report dated 8 June 2023 by the Executive Director (Finance and Corporate Resources) was
submitted advising on the budget position for 2024/2025. 
At the Council meeting held on 22 February 2023, members were advised of an expected budget
gap for 2024/2025 which, at that time, was considered to be £16.8 million.  That figure was,
however, subject to change and details were now provided on the current estimate for the budget
gap for 2024/2025.  In line with the usual approach, information was provided on estimates of
Government Grant levels, requirements identified for revenue expenditure items, including the
impact of previous budget decisions and, ultimately, the Budget Gap that had to be met to balance
the budget for that year. 
The focus on the 2024/2025 revenue budget position would cover:- 
 revenue budget expenditure items
 corporate solutions
 summary and next steps 
There were a number of revenue budget expenditure items that affected the Budget Strategy
2024/2025 and those were detailed in Appendix 1 and Table 1 of the report.  The core budget
strategy expenditure items gave an initial budget gap for 2024/2025 of £60.102 million before
corporate solutions. 
In considering the Budget Gap, some offsetting solutions could be taken into account and those
corporate solutions were detailed in Appendix 2 and Table 2 of the report.  Taking those into
account would reduce the budget gap to £29.207 million.  The Budget Strategy for 2024/2025
included a number of solutions which were temporary in nature and would require to be reinstated
in 2025/2026 and those were detailed in Table 3 of the report.  
10

Page 11

At its meeting on 18 January 2023, the Council approved the implementation of the guidance on
accounting for Service Concessions.  This had resulted in a retrospective gain of £64 million. 
Members had previously agreed to use £11.4 million of the retrospective gain from service
concessions to pay for the increased 2022/2023 pay award in 2022/2023 and 2023/2024.  At the
Council meeting held on 18 January 2023, members were advised that that, after taking into
account the costs of the additional pay award, consideration could then be given to using £42.6
million of the retrospective benefit to support the Council’s medium term budget strategies across
2024/2025 and 2025/2026 leaving £10 million of the £64 million retrospective benefit unallocated. 
£6.565 million of that sum was subsequently used at part of the budget motion agreed at the
Council meeting held on 22 February 2023.  It was proposed to use £27.500 million of the service
concession retrospective gain in 2024/2025.  This would leave £18.535 million of service
concession funding unallocated. 
Taking account of the Corporate Solutions, which included the efficiencies from the ongoing
Reviews, the Budget Gap for 2024/2025 was £29.207 million, as detailed in section 5.3 of the
report.  This Budget Gap was based on the assumptions and estimates included in sections 4 and
5 of the report.  Options to meet the budget gap would be developed for future consideration,
however, the extent of the budget gap would require options significantly beyond the level of
efficiencies made in previous years. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Revenue Budget position for 2024/2025, as detailed in sections 4 and 5 of the report,
resulting in a Budget Gap of £29.207 million, be noted; 
(2) that the use of service concession funds, as detailed at section 5.9 of the report, be
approved; and 
(3) that approval be given for options to meet the budget gap to be developed for members’
consideration and brought back to a future meeting, as detailed in section 6.3 of the report. 
[Reference: Minutes of South Lanarkshire Council of 18 January 2023 (Paragraph 3), Minutes
of 1 February 2023 (Paragraph 3), Minutes of South Lanarkshire Council of 22
February 2023 (Paragraph 2)] 
9 Jackton Primary School and Jackton Early Learning and Childcare Centre Staffing
Requirements 
A joint report dated 24 May 2023 by the Executive Directors (Education Resources), (Community
and Enterprise Resources) and (Finance and Corporate Resources) was submitted advising of
the staffing position in respect of the new Jackton Primary School and Jackton Early Learning and
Childcare Centre (ELCC), both due to open in August 2023. 
The new Jackton Primary School and separate Jackton ELCC were currently under construction
and would be ready for occupation in August 2023.  At full capacity, the management structure of
the school, given a mainstream roll of 510 pupils, plus Additional Support Needs (ASN), would be
1 Head Teacher, 3 Depute Head Teachers and 2 Principal Teachers.  Similarly, at full capacity,
the ELCC would be managed by 1 Head of Centre and 1 Depute Head of Centre and would
operate 52 weeks per year. 
Teachers, Early Years and Support staff would be established over time in line with the
requirements of the roll of the new school, the ELCC and the needs of individual children.  The
staffing requirements of the new establishments, when at capacity, was as follows:-  
11

Page 12

Jackton Primary School 
Post  FTE  Grade/SCP Range Annual Salary
Head Teacher 1 Depute/Head
Teacher 10
£76,704
Depute Head Teacher 3 Depute/Head
Teacher 2
£60,627
Principal Teacher 2 Principal Teacher 2 £53,997
Classroom Teachers 17
(mainstream) 4 AST Base
Plus CCC
22.5 Class Teacher £47,565
Support Staff Team Leader
(Office) 27.5 hours per week
1 Grade1 Level 4 (TT)
30-31
£20,448 to £20,736
School Support Assistants (8
ASN, 7 mainstream, 1 office)
27.5 hours per week
16 Grade 1 Level 1
(TT) 27
£18,043 to £19,680 
Jackton Early Learning and Childcare Centre 
Post  FTE  Grade/SCP Range Annual Salary
Head of Centre 1 Grade 4 Level 2 82-83 £48,943 to £49,715
Depute Head of Centre 1 Grade 3 Level 8 79-80 £46,840 to £47,535
Early Years Team Leader 1 Grade 2 Level 4 55-57 £33,529 to £34,494
Early Years Practitioner 11 Grade 2 Level 3 46-48 £29,632 to £30,481
Early Years Support
Assistants
2 Grade 1 Level 1-3 20-
27
£22,100
School Support Assistant 1 Grade 1 Level 4 31 £23,286 
Facilities Services Staff 
Post  FTE  Grade/ SCP Range Annual Salary
Janitor
(41.5 hours per week) 
1.5 Grade 1 Level 1-3 25-
27
£25,554 to £26,204
Catering
(37 hours per week)
4.4 Grade 1 Level 1 (TT)
20
£19,086
1.5 Grade 1 Level 1 20 £21,443
0.9 Grade 1 Level 3 20 £22,783 to £23,362
Cleaning
(37 hours per week)
3.1 Grade 1 Level 1 (TT)
20
£19,086
0.9 Grade 1 Level 1 (TT)
20-27
£21,433 to £23,362 
Total full year cost for staffing, when at capacity, aligned to current staff to pupil ratios and
legislative class sizes based on current pay agreements, was £3.383 million. 
The staffing costs for the first year of operation for both the school and ELCC, based on current
school numbers, was outlined in Table 2 of the report. 
Enrolment levels would be monitored to evaluate staffing requirements for August 2024 and
beyond.  The resulting increase in staffing budget requirements for both establishments would be
managed through current education budgets for 2023/2024. with any required revenue
consequences from this capital investment being considered as part of budget strategies.
12

Page 13

The Committee decided: 
(1) that the establishment of the management posts of Head Teacher and Depute Head
Teacher to lead Jackton Primary School, due to open in August 2023, as detailed in section
4 and Table 1 of the report, be approved; 
(2) that the establishment of the management posts of Head of Centre, Depute Head of Centre
and Team Leader to lead Jackton Early Learning and Childcare Centre (ELCC), due to open
in August 2023, as detailed in section 4 and Table 1 of the report, be approved; 
(3) that the staffing requirements, based on capacity, as outlined in Table 1 for both
establishments, to be established in line with standard pupil roll related procedures, ASN
staffing protocols and Early Years adult:child ratios and including the staffing to cover
facilities services (Janitorial, Catering, and Cleaning) be approved; 
(4) that it be noted that, as rolls increased, both establishments would continue to be staffed as
required; and 
(5) that the budgetary impact of the staffing requirements for both establishments, as detailed
in section 5 of the report, be noted. 
10 South Lanarkshire Social Enterprise Strategy 2023 to 2027 
A report dated 26 May 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on the South Lanarkshire Social Enterprise Strategy 2023 to 2027. 
The proposed Social Enterprise Strategy, attached at Appendix 1 to the report, set out the
Council’s commitment to increase the number of social enterprises and improve the sustainability
of the sector in South Lanarkshire.  The third sector had been consulted on the preparation of the
Strategy and a list of consultees was provided at Appendix 2 to the report. 
The 3 high level priories of the Strategy were:- 
 stimulating social enterprise
 developing stronger organisations
 realising market opportunity 
The Strategy would:- 
 provide an ongoing framework for dialogue about, and influence upon, capacity building and
business support practices as they affected, and were informed by, enterprising third sector
organisations and, specifically, social enterprises
 support the sector and ensure that South Lanarkshire social enterprises received targeted
assistance to start up and grow 
Details were given on the various sections contained within the Strategy, including its context and
priorities.  It was proposed that the Social Economy Steering Group would oversee the effective
implementation of the Strategy. 
Details were also given on local initiatives to support social enterprises within South Lanarkshire. 
If approved, the Strategy would be launched in autumn 2023 as part of a wider local event for the
enterprising third sector and key stakeholders.  
13

Page 14

The Committee decided: that the South Lanarkshire Social Enterprise Strategy 2023
to 2027 be approved. 
11 Equalities Mainstreaming Progress Report 
A report dated 28 April 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on progress achieved in meeting the Council’s equality outcomes in the period 2021 to
2023 and in mainstreaming equalities within the Council. 
The equalities outcomes were included in the Council Plan, “Connect” to ensure equalities duties
were mainstreamed into the culture of the Council.  A number of actions, which had been
undertaken to progress the equality outcomes, were detailed in the report, including information
on the workforce profile and the gender pay gap.  The Mainstreaming Equalities Outcomes for the
period 2021 to 2025 were detailed in the report and at Appendix 1 to the report.  The
Mainstreaming Equalities Outcomes report had been published on the Council’s website and the
Equality and Human Rights Commission would undertake a process of checking compliance. 
Officers:- 
 responded to members’ questions
 undertook to look at areas for expansion in terms of reporting and, where appropriate, to
bring those to the Equal Opportunities Forum for its consideration
 undertook to obtain the most up to date information available from the census process for
inclusion in reports 
The Committee decided: that the Equalities Mainstreaming Progress Report for the
period 2021 to 2023 be approved. 
[Reference:  Minutes of 26 May 2021 (Paragraph 9)] 
In terms of Standing Order No 14, the Chair adjourned the meeting at 11.30am for a 10 minute period. 
The meeting reconvened at 11.40am 
12 Strategic Environmental Assessment Progress 2022/2023 
A report dated 26 May 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on progress in carrying out Strategic Environmental Assessments (SEA) on the
Council’s policies, plans, programmes and strategies. 
The Council had a statutory duty to consider and carry out an SEA for all its policies, plans,
programmes and strategies as they were being developed or refreshed.  The Environmental
Assessment (Scotland) Act 2005 required the Council to assess whether plans were within the
scope of the legislation and whether SEA was required.  This could be considered either through
Pre-Screening or Screening. 
3 assessments of plans had been completed at the Pre-screening stage, as detailed in Table 1 of
the report.  At that stage, the Council had informed the Scottish Government that those plans were
exempt from SEA as their implementation would have no, or minimal, effect on the environment.   
4 plans had been finalised at Screening stage, as detailed in Table 2 of the report.  A formal
determination had been made and agreed by the Consultation Authorities that further SEA work
was not required for those plans.  
14

Page 15

During 2022/2023, the following plans were all subject to full SEA:- 
 Community Plan 
 Council Plan
 Sustainable Development and Climate Change Strategy
 Local Housing Strategy 
The final Stage of the SEA process was the preparation and submission of a Post Adoption
Statement to the SEA Gateway.  This Statement set out the key findings from the SEA and how
those had been taken into account in the final adopted plan.  In 2022/2023, the Community Plan,
Council Plan and Sustainable Development and Climate Change Strategy had been adopted and
Post Adoption Statements had been submitted, as statutorily required.  The Post Adoption
Statement for the Local Housing Strategy had been prepared and submitted in May 2023. 
The Committee decided: that the statutory requirement for Strategic Environmental
Assessments (SEA) to inform the development of Council
led policies, plans, programmes and strategies be noted. 
13 Resource Plans and Connect Reporting 2023 to 2024 
A report dated 22 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the 2023/2024 Resource Plans. 
The Resource Plans for 2023/2024 had been prepared in line with corporate Resource Planning
guidance and a Resource Plan template.  The Resource Plans had been reviewed and updated
to take account of the new Priorities and Outcomes within Connect 2022 to 2027. 
In preparing the 2023/2024 Plans, Resources had undertaken a horizon scanning and situational
awareness exercise covering:- 
 social change, legislation and policies 
 areas for improvement, including the Local Government Benchmarking Framework (LGBF)
 customer views and external inspection results 
 other triggers for action such as top risks 
From that exercise, a maximum of 10 areas had been selected for inclusion and development in
each Resource Plan and those were detailed in the report.  The Resource Plans 2023/2024 were
attached as Appendix 1 to the report. 
Resources had used the 6 Connect outcomes to generate their own Resource outcomes,
supported by a range of actions and measures.  Additional actions and measures had also been
developed under the heading Delivering the Plan and Achieving Best Value.  Details were given
on the number of measures from each Resource Plan selected to be reported against Connect. 
The suite of Resource Plans for 2023/2024 would be submitted to each individual Resource
Committee for monitoring at Quarter 2 and Quarter 4. 
The Committee decided: 
(1) that the Resource Plans 2023 to 2024, prepared in line with revised corporate Guidance, be
noted; and 
(2) that the reporting intentions in relation to Connect, as detailed in Section 5 of the report, be
noted. 
[Reference: Minutes of 24 August 2022 (Paragraph 8)] 
15

Page 16

14 Item of Urgent Business– Summer Holiday Provision 2023 
In terms of Standing Order No 4(c) of the Council’s Standing Orders on Procedures, the Chair
decided that, due to the timescales involved, consideration be given to the following item as a
matter of urgency. 
Councillor Hamilton referred to the position in relation to Scottish Government funding for summer
holiday provision, through Education Resources, for targeted children.  She:- 
 expressed concern that funding had initially been withdrawn from this programme
 indicated that the revised position, of which the Council had only recently become aware,
whereby some, considerably reduced, funding would be made available would significantly
impact on the provision which could be offered
 advised that she had written to the relevant Minister urging reconsideration of the decision
to reduce the funding
 asked that officers provide an update on the position in relation to the summer holiday
provision which could be offered 
The Executive Director (Education Resources) advised that a briefing paper would be issued to
all members in early course, once further information had been received from the Scottish
Government. 
There followed a full discussion during which:- 
 officers responded to members’ questions
 in response to a member’s request, officers undertook to provide an update on the position
in relation to targeted wraparound care as well as provision offered by the Scottish
Government in conjunction with the Scottish Football Association (SFA)
 members indicated that the matter would be raised at COSLA, with MSPs and at ministerial
level 
The Committee decided: that the position be noted. 
15 Item of Urgent Business– South Lanarkshire Leisure and Culture (SLLC) 
In terms of Standing Order No 4(c) of the Council’s Standing Orders on Procedures, the Chair
decided that consideration be given to the following item, as a matter of urgency. 
Councillor Allison referred to press reports relating to a decision of an Employment Tribunal to
award a compensatory payment to an ex-employee of South Lanarkshire Leisure and Culture
(SLLC). 
He:- 
 requested an update on the position and on how this had affected and could affect the
Council
 reiterated his request for a report on the use of the monies for the Warm Welcome Initiative
 emphasised the requirement for openness and transparency on the part of SLLC 
There followed a full discussion and exchange of views during which:- 
 officers responded to members’ questions
 officers provided clarity on matters which could be discussed in an open forum
 members expressed a wish to explore the implications of the matter for the Council and to
establish if there were any lessons to be learned  
16

Page 17

 the Chief Executive advised that:- 
 a report on the Warm Welcome Initiative would be submitted to an early future meeting
of the Committee
 in respect of actions arising from the SLLC commissioned external legal review of the
lessons learned and what could be shared, he would take advice 
The Committee decided: that the position be noted. 
16 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraph 8, 9 and 10 of Part
I of Schedule 7A of the Act. 
17 Housing and Property Management System 
A report dated 28 August 2023 by the Executive Director (Housing and Technical Resources) was
submitted providing an update on the replacement housing and property management system. 
Details were given on:- 
 the termination of the existing contract for the provision of a new integrated housing and
property management system
 options considered for the purchase of a new system 
 a proposed solution which met the Council’s requirements 
A detailed project plan would be developed to support the implementation of the new system
which would be closely monitored through a dedicated Project Review Board with regular updates
provided to the Housing and Technical Resources Committee 
The Committee decided: 
(1) that the termination of the existing contract for the provision of a new integrated housing and
property management system be noted; and 
(2) that the intention to proceed with the award of a contract to Capita, to provide a new housing
and property management system, in accordance with Standing Order 13 (framework
agreements – external), subject to conclusive satisfactory negotiations, be noted. 
17

Page 18

18

Page 19

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 16 August 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 1 April 2023 to 14
July 2023 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Committee of the overall financial position of the Council’s General
Fund Revenue Account and Housing Revenue Account for the period 1 April
2023 to 14 July 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the break-even position on the General Fund Revenue Account at 14 July
2023, (section 4 and Appendix 1), be noted; and
(2) that the breakeven position on the Housing Revenue Account at 14 July 2023
(section 5 and Appendix 2 of the report), be noted. 
3. Background
3.1. This overview report will summarise the actual expenditure and income to 14 July 2023
compared with the budget for the same period for both the Council’s General Fund
(section 4) and for the Housing Revenue Account (section 5).   
4. 2023/2024 General Services 
4.1. General Services Current Position as at 14 July 2023 
As at 14 July 2023, the position on the General Services budget is break-even.  The
position across Resources is detailed in Appendix 1. 
4.2. Children and Families:  As previously reported, budget pressures within Children and
Families are continuing into 2023/2024 in relation to residential placements, fostering
and kinship care, some of which is a legacy from the pandemic.   
4.3. As previously advised to Social Work Committee (28 June 2023), there is one-off
funding identified totalling £9.2 million, and this is available this financial year to
contribute towards these residual Children and Families’ pressures. 
4.4. The Social Work Resources position as at 14 July 2023 assumes funding will be
available and will be drawn down later in the financial year, as required.  The Resource
is working towards managing the overall budget pressure in Children and Families by
2024/2025.  
3
19

Page 20

4.5.  Adults and Older People:  Within Adults and Older People, the outcome of the Job
Evaluation exercise for Home Carers will result in recurring costs of approximately £7
million from 2023/2024.  These costs are not included in the IJB budget set for
2023/2024.  As at 14 July, costs of £1.9 million have been incurred in relation to the
cost of the grade changes.  These costs are incurred through the IJB budget.  As a
consequence of the reporting requirements for these integrated authorities, these
costs also appear within the figures included in Appendix 1.  This does not show as
an overspend in Appendix 1 as there is sufficient budget available at this stage in the
financial year to cover the additional costs incurred to date. 
4.6. Officers within the IJB are looking to identify solutions.  These solutions and an overall
recovery plan will be reported to the IJB on 19 September 2023 and, subject to their
approval, budgets will be realigned. 
5. Housing Revenue Account Position as at 14 July 2023
5.1. As at 14 July 2023, Appendix 2 shows a break-even position against the phased
budget on the Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
26 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None
20

Page 21

List of Background Papers
 Financial Ledger and budget monitoring results to 14 July 2023. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
21

Page 22

Appendix 1 (a) 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 14 July 2023 (No.4) 
Resource / Committee
Annual
Budget
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
to 14/07/23 
Actual to
14/07/23 
Variance to
14/07/23 
Departments: £m £m £m  £m £m £m 
Community and Enterprise Resources 129.568 129.568 0.000  32.158 32.158 0.000  
Facilities, Waste and Grounds 77.505 77.505 0.000  18.260 18.170 0.090 under
Leisure and Culture 23.227 23.227 0.000  5.340 5.340 0.000  
Planning and Regulatory 4.966 4.966 0.000  1.385 1.228 0.157 under
Environmental and Sustainable Development 4.995 4.995 0.000  0.869 0.846 0.023 under
Roads, Transportation and Fleet 18.875 18.875 0.000  6.304 6.574 (0.270) over
Education Resources 417.667 417.667 0.000  119.307 119.307 0.000  
Education 417.667 417.667 0.000  119.307 119.307 0.000  
Finance and Corporate Resources 40.774 40.774 0.000  18.057 18.057 0.000  
Finance Services - Strategy 2.118 2.118 0.000  0.949 0.916 0.033 under
Finance Services - Transactions 18.397 18.397 0.000  6.087 5.894 0.193 under
Audit and Compliance Services 0.374 0.374 0.000  0.169 0.187 (0.018) over
Information Technology Services 5.226 5.226 0.000  5.446 5.404 0.042 under
Communications and Strategy Services 2.754 2.754 0.000  1.065 1.085 (0.020) over
Administration and Licensing Services 4.239 4.239 0.000  1.400 1.480 (0.080) over
Personnel Services 7.666 7.666 0.000  2.941 3.091 (0.150) over
Housing and Technical Resources 14.176 14.176 0.000  13.441 13.441 0.000  
Housing Services 8.464 8.464 0.000  2.721 2.721 0.000  
Property Services 5.712 5.712 0.000  10.720 10.720 0.000  
Social Work Resources 214.719 214.719 0.000  61.098 61.098 0.000  
Performance and Support Services 6.358 6.358 0.000  1.558 1.470 0.088 under
Children and Families 37.215 37.215 0.000  11.982 12.107 (0.125) over
Adults and Older People 170.058 170.058 0.000  46.996 46.996 0.000  
Justice and Substance Misuse 1.088 1.088 0.000  0.562 0.525 0.037 under
Joint Boards 2.053 2.053 0.000  0.632 0.632 0.000           
818.957 818.957 0.000  244.693 244.693 0.000 
Summary
Annual
Budget
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
to 14/07/23 
Actual to
14/07/23 
Variance to
14/07/23 
£m £m £m  £m £m £m 
Service Departments Total 818.957 818.957 0.000  244.693 244.693 0.000 
CFCR 0.012 0.012 0.000  0.000 0.000 0.000 
Loan Charges 23.669 23.669 0.000  0.000 0.000 0.000 
Corporate Items 2.073 2.073 0.000  0.041 0.041 0.000 
Corporate Items (Strategy) 15.211 15.211 0.000  0.000 0.000 0.000 
2023/24 Investments – Transfers to Reserves 3.276 3.276 0.000  0.000 0.000 0.000 
0.000     
Total Expenditure 863.198 863.198 0.000  244.734 244.734 0.000 
Council Tax 178.602 178.602 0.000  54.954 54.954 0.000 
Less: Council Tax Reduction Scheme (23.278) (23.278) 0.000  (7.162) (7.162) 0.000 
Net Council Tax 155.324 155.324 0.000  47.792 47.792 0.000 
General Revenue Grant 319.300 319.300 0.000  98.246 98.246 0.000 
Non-Domestic Rates 341.536 341.536 0.000  105.088 105.088 0.000 
Transfer from Reserves 47.038 47.038 0.000  47.038 47.038 0.000 
Total Income 863.198 863.198 0.000  298.164 298.164 0.000 
Net Expenditure / (Income)  0.000 0.000 0.000  (53.430) (53.430) 0.000 
22

Page 23

Appendix 1b 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 14 July 2023 (No.2) 
Budget Category 
Annual
Budget 
Annual
Forecast 
Annual
Forecast
Variance   
Budget
Proportion
to 19/05/23 
Actual to
19/05/23 
Variance to
19/05/23 
Service Departments:  £m £m £m  £m £m £m 
Expenditure        
Employee Cost 611.305  611.305  0.000   165.272 165.738 (0.466) over
Property Costs 61.080  61.080  0.000   11.040 11.203 (0.163) over
Supplies and Services 61.744  61.744  0.000   15.702 16.143 (0.441) over
Transport Costs 44.896  44.896  0.000   13.556 14.206 (0.650) over
Administration Costs 15.522  15.522  0.000   3.074 3.105 (0.031) over
Payments to Other Bodies 73.935  73.935  0.000   24.259 24.197 0.062 under
Payments to Contractors 245.026  245.026  0.000   56.634 54.906 1.728 under
Transfer Payments 6.248  6.248  0.000   3.485 3.509 (0.024) over
Housing Benefits 65.302  65.302  0.000   15.641 15.641 0.000  
Financing Charges (controllable) 2.346  2.346  0.000   0.273 0.277 (0.004) over             
Total 1,187.404  1,187.404  0.000   308.936 308.925 0.011 under                
Service Departments Total 1,187.404  1,187.404  0.000   308.936 308.925 0.011 under
CFCR 0.012  0.012  0.000   0.000 0.000 0.000  
Loan Charges 23.669  23.669  0.000   0.000 0.000 0.000  
Corporate Items 2.073  2.073  0.000   0.041 0.041 0.000  
Corporate Items (Strategy) 15.211  15.211  0.000   0.000 0.000 0.000  
2023/24 Investments – Transfers to Reserves 3.276  3.276  0.000   0.000 0.000 0.000              
Total Expenditure 1,231.645  1,231.645  0.000   308.977 308.966 0.011 under            
Income           
Housing Benefit Subsidy 60.258  60.258  0.000   14.010 14.010 0.000  
Other Income 308.189  308.189  0.000   50.233 50.222 (0.011) under rec.
Council Tax (Net of Council Tax Reduction Scheme) 155.324  155.324  0.000   47.792 47.792 0.000  
General Revenue Grant 319.300  319.300  0.000   98.246 98.246 0.000  
Non-Domestic Rates 341.536  341.536  0.000   105.088 105.088 0.000  
Transfer from Reserves 47.038  47.038  0.000   47.038 47.038 0.000              
Total Income 1,231.645  1,231.645  0.000   362.407 362.396 (0.011) under rec.            
Net Expenditure / (Income) 0.000  0.000  0.000   (53.430) (53.430) 0.000           
23

Page 24

Appendix 2 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 14 July 2023 (No.4) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year
Annual
Forecast
Variance   
Budget
Proportion
to 14/07/23 
Actual to
14/07/23 
Variance to
14/07/23 
% Note 
£m £m £m  £m £m £m   
Employee Costs 14.253 14.253 0.000  3.781  3.816  (0.035) over (0.9%) a
Property Costs 50.929  50.929  0.000  10.910  11.259  (0.349) over (3.2%) 1
Supplies & Services 0.433  0.433  0.000  0.159  0.177  (0.018) over (11.3%) 
Transport & Plant 0.196  0.196  0.000  0.045  0.049  (0.004) over (8.9%) 
Administration Costs 5.570  5.570  0.000  0.152  0.137  0.015  under 9.9% 
Payments to Other Bodies 2.974  2.974  0.000  0.634  0.661  (0.027) over (4.3%) 
Payments to Contractors 0.100  0.100  0.000  0.025  0.025  0.000  - 0.0% 
Transfer Payments 0.000  0.000  0.000  0.000  0.000  0.000  - 0.0% 
Financing Charges 27.162  27.162  0.000  5.904  5.904  0.000  - 0.0% 
Total Controllable Expenditure 101.617 101.617 0.000  21.610  22.028  (0.418) over (1.9%) 
Total Controllable Income (115.940) (115.940) 0.000  (28.015) (28.113) 0.098  over
recovered 0.3% 2, a
Transfer to/(from) Balance Sheet (4.907) (4.907) 0.000  (0.377) (0.697) 0.320  over
recovered 84.9% 3
Net Controllable Expenditure (19.230) (19.230) 0.000  (6.782) (6.782) 0.000  - 0.0% 
Add: Non Controllable Budgets         
Financing Charges 19.230  19.230  0.000  0.000  0.000  0.000  - 0.0% 
Total Budget 0.000  0.000  0.000  (6.782) (6.782) 0.000  - 0.0% 
Variance Explanations
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor.  There is also an overspend in
relation to cleaning charges.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.  
3. The timing impact of the net overspend requires a higher than budgeted transfer from reserves at this time. 
Virements
a.  Realignment of Housing Advice and Support Team Establishment Costs. Net £0.000m: (Employee Costs £0.396m); Income £0.396m. 
24

Page 25

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 16 August 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2023/2024 and Monitoring for Period 4 -
1 April 2023 to 14 July 2023 
1. Purpose of Report
1.1. The purpose of the report is to: 
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2023 to
14 July 2023  
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):  
(1) that the period 4 position (ended 14 July 2023) of the General Fund Capital
Programme, detailed in Appendices 2 to 3, and the Housing Capital Programme
at Appendix 4, be noted; 
(2) that the adjustments to the General Fund programme, listed at Appendix 1, and
the Housing programme listed at Sections 5.1 and 5.2, be approved; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 14 July 2023.  Spending has been split into two separate sections: 
 General Fund Capital Programme including Education, Social Work, Roads
and Transportation and General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme 
4.1. 2023/2024 Budget: The budget agreed at Executive Committee on 21 June 2023 was
£81.990 million.  A revised programme of £83.322 million is now anticipated, which
includes adjustments to the programme totalling a net increase of £1.332 million,
which are proposed in Appendix 1.  This increase mainly reflects additional funding
from external bodies which are required to be spent on specific programmes of work.     
4.2. General Fund – Period 4 Position:  As noted in 4.1, the total capital spending
programme for the year is £83.322 million.  The detailed programme and spend for
the General Fund are shown in Appendices 2 and 3.    
4
25

Page 26

4.3. Appendix 3 also shows budget for the period of £9.998 million and spend to the 14
July 2023 of £9.856 million, slightly behind programme by £0.142 million.     
4.4. Actual funding received to 14 July 2023 is £41.715 million.  Relevant officers will
closely monitor the generation of all income, including receipts. 
5. Housing Capital Programme
5.1. 2023/2024 Budget:  Appendix 4 summarises the position on the Housing programme
as at 14 July 2023.  The original budget for the year was £63.916 million, as approved
by this Committee on 21 June 2023.  The Final Outturn report for financial year
2022/2023 noted a carry forward of £8.081 million into future years. Further analysis
of this budget confirms that £3.997 million is required in 2023/24, with the remainder
being carried forward into future years. 
5.2. In addition, it is proposed that the 2023/2024 Capital Programme be increased by a
further £1.683 million to reflect the expenditure on new build homes at East
Whitlawburn, which are being built on behalf of West Whitlawburn Housing
Association. 
5.3. As a result of these adjustments noted at sections 5.1 and 5.2, a revised programme
of £69.596 million is presented for approval. Programmed funding for the year also
totals £69.596 million. The funding sources are also detailed in Appendix 4. 
5.4. Period 4 Position:  Budget for the period is £13.250 million and spend to 14 July 2023
amounts to £12.469 million.  This results in the Housing Programme being £0.781
million behind programme.  This is a timing issue only at this stage.   
5.5. As at 14 July 2023, £12.469 million of funding had been received. 
6. Employee Implications
6.1. There are no employee implications as a result of this report.  
7. Financial Implications
7.1. The General Services and Housing Programme Programmes and their spend position
to 20 May 2022 are detailed in sections 4 and 5 respectively. 
7.2. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to this Committee. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
investment management meetings. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required.  
26

Page 27

10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
26 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 21 June 2023 
List of Background Papers
 Capital Ledger prints to 14 July 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
27

Page 28

Appendix 1
Proposed Adjustments 
Community and Enterprise Resources 
Electric Vehicle Expansion
Funding has been made available to develop a public electric vehicle charging
network. Approval is sought to increase the 2023/24 Capital Programme by £0.048
million which will be funded by a contribution from Transport Scotland.  This will fund
the development of a Public Electric Vehicle Charging Strategy and Infrastructure
Expansion Plan. 
£0.048m
Memorial Headstone Inspection & Remedial Works 
In line with previous financial years, £0.200 million is required to ensure compliance
with the Scottish Government’s 5-year inspection programme guidance and
subsequent remedial works for memorial headstones.  Approval is sought to transfer
£0.200 million from the 2023/2024 Extension of Cemeteries allocation.   
£0.200m
(£0.200m)
Nature Restoration Fund
The Scottish Government have confirmed the next phase of Nature Restoration Fund
(NRF) capital funding to be spent in 2023/2024 to support new, or to enhance
existing, approaches to restoring biodiversity across Scotland.  The national allocation
is £5 million and this is augmented this year by an additional £5 million with a specific
focus on creating Nature Networks.  Of this national total of £10 million, South
Lanarkshire have been allocated £0.545 million in 2023/2024, which will be distributed
via the General Capital Grant.   
Approval is sought to increase the 2023/2024 Capital Programme by £0.545 million
and officers are currently working to identify projects for delivery in-year. 
£0.545m
Road Safety Improvement Fund
A grant funding allocation has been received from the Scottish Government to deliver
safe system measure to support casualty and/or risk reduction and to address key
priorities within our road casualty statistics or emerging issues. 
Approval is sought to increase the 2023/2024 Capital Programme by £0.475 million.   
£0.475m  
Education Resources 
Stonelaw High School – Adaptations
Approval is sought to increase the 2023/24 Capital Programme by £0.222 million,
which will allow a project to undertake adaptations at Stonelaw High School, to
accommodate increased pupil numbers, to commence this financial year. This project
will be funded by developer contributions already received for this area.   
In order to reflect the anticipated timescales for this project, £0.030 million will be
required to undertake design works in financial year 2023/2024.  Approval is sought to
slip the balance of £0.192 million into financial year 2024/2025, which will allow the
physical works to be programmed during the school holidays in summer 2024.   
£0.222m 
(£0.192m)  
28

Page 29

Inspiring School Age Childcare Spaces Programme 
The Scottish Government, through the Inspiring School Age Childcare Spaces
Programme, have awarded this Council £0.234 million to improve out of school care
provision in a number of schools during 2023/2024: 
School Name Value
Blacklaw Primary School £0.040m
St Anthony’s Primary School  £0.040m
Woodside Primary School £0.040m
Calderwood Primary School £0.084m
Murray Primary School £0.030m  
Total     £0.234m 
Approval is sought to increase the 2023/24 Capital Programme by £0.234m 
£0.234m  
Minor Adjustments -  
TOTAL ADJUSTMENTS £1.332m 
29

Page 30

APPENDIX 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 14 JULY 2023 
£m  
Total Base Budget (including carry forward from 2022/2023) 81.990  
Proposed Adjustments – Period 4 1.332  
Total Revised Budget 83.322     
2023/24
Budget 
Period 4
Proposed
Adjustments 
Revised
2023/24
Budget
Resource £m £m £m    
Community & Enterprise 41.857 1.068 42.925
Education 19.047 0.264 19.311
Finance & Corporate 5.333 - 5.333
Housing & Technical 11.923 - 11.923
Social Work 2.030 - 2.030
Other Match Funding 1.800 - 1.800    
TOTAL CAPITAL PROGRAMME 81.990 1.332 83.322      
30

Page 31

APPENDIX 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 14 JULY 2023 
2023/24
Original
Estimate inc
C/F 
2023/24
Revised
Budget 
2023/24
Budget to
14/07/23 
2023/24
Actual to
14/07/23     
Expenditure £m £m £m £m     
General Fund Programme 77.849 83.322 9.998 9.856 
Income
2023/24
Budget
2023/24
Revised
Budget 
2023/24
Actual
To
14/07/23         
£m         £m  £m
Prudential Borrowing 24.959 24.962  24.962
Developers Contributions 7.658 8.058  4.225
Partners (Including SPT, Clyde Windfarm
and Transport Scotland)
2.157 4.099  0.500
Scottish Government:     
- Capital Grant 33.985 34.527  7.229 
- Cycling, Walking and Safer
Routes
1.632 2.284  0.000
- Road Safety Improvement 0.000 0.475  0.000 
- Vacant and Derelict Land 2.019 2.019  1.334 
- Regeneration Capital Grant  0.737 0.737  0.745 
- Place Based Investment
Programme
1.510 2.723  1.510
-Inspiring School Age Childcare
Spaces Programme
0.000 0.234  0.000
Glasgow City Region City Deal 0.000 0.000  0.000
Capital Receipts 2.000 2.000  0.006
Specific Reserves 1.192 1.192  1.192
Revenue Contribution 0.000 0.012  0.012     
TOTAL FUNDING 77.849 83.322  41.715 
31

Page 32

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/24
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 14 JULY 2023 
2023/24
Original 
Budget  
2023/24
Revised
Budget
2023/24
Budget to
14/07/23
2023/24 
Actual to
14/07/23 
£m £m £m £m
Expenditure 
2023/24 Budget  63.916  69.596  13.250  12.469     
2023/24
Original 
Budget  
2023/24
Revised
Budget 
2023/24
Actual to
14/07/23 
£m £m  £m
Income         
Capital Receipts 0.000 1.683  1.683
Capital Receipts – Land Sales 0.000 0.000  0.005
Capital Funded from Current Revenue 27.162 27.162  5.902
Prudential Borrowing 17.302 23.331  0.000
Scottish Government Specific Grant:    
- New Build 16.632 12.036  4.748
- Open Market Purchase Scheme 2.700 5.264  0.000
- Mortgage to Rent 0.120 0.120  0.131 
63.916 69.596  12.469 
32

Page 33

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 August 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Additional Funding from Scottish Government and
Other External Sources 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (21 June 2023)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the additional funding totalling £1.478 million, detailed in Appendices 1 and
2, be noted. 
3. Background
3.1. The Council is periodically advised of additional funding which is made available from
the Scottish Government and other sources to enable various initiatives to be
undertaken. 
3.2. Additional funding may either be paid through the General Revenue Grant mechanism
or by the completion of appropriate grant claims. 
3.3. Details of the additional funding are attached in Appendices 1 and 2 of the report,
Revenue and Capital respectively.  The report details additional funding that has been
reported by Resources as part of the additional resources notification process, as well
as any additional funding that has increased the Council’s budget by more than £0.100
million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £0.458 million has been identified for 2023/2024.   This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £1.020 million has been identified for 2023/2024.  This is
detailed in Appendix 2.    
5
33

Page 34

5.3. The total additional funding is, therefore, £1.478 million and Resource budgets will be
updated to reflect this additional funding as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
7.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
27 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 21 June 2023 
List of Background Papers
 Additional Funding Reports 26 April 2023 to 26 July 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
34

Page 35

Additional Revenue Funding 
Resource  Description  2023/2024
£m 
2024/2025
£m 
Total
£m 
Method
Education
Resources 
Summer Programmes 0.228 - 0.228 Scottish
Government 
Education
Resources
Education Support to Ukrainian
Children and Young People
0.230 - 0.230 Scottish 
Government 
TOTAL REVENUE FUNDING 0.458 - 0.458 
35

Page 36

Appendix 2 
Additional Capital Funding 
Resource  Description  2023/2024
£m 
2024/2025
£m 
Total
£m 
Method
Community and
Enterprise
Resources 
Nature Restoration Fund  0.545 - 0.545 Scottish
Government
Community and
Enterprise
Resources 
Road Safety Improvement Fund 0.475 - 0.475 
TOTAL CAPITAL FUNDING 1.020 - 1.020 
36

Page 37

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 16 August 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Cost of Living – Support 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 provide the Executive Committee with an overview of the support provided to
households in South Lanarkshire significantly impacted by the cost of living
crisis
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s): -
[recs]h
(1) that the range of support being provided by the council to households in
response to the impact of the cost of living crisis is noted;
(2) that the re-direction of 2023-24 funding for energy support to the Financial
Wellbeing Support Fund as outlined in section 4.1 is approved; and
(3) that the re-direction of any underspend from the provision of energy support to
the Financial Wellbeing Support Fund as outlined in 4.2 is approved 
[1recs] 
3. Background
3.1. The UK is experiencing the worst cost of living crisis in 40 years.  A combination of
continuing high inflation and successive increases in interest rates is putting further
pressure on household incomes.  While there are some signs energy costs are starting
to ease, they remain significantly higher than they were before February 2022. 
3.2. Both the UK and Scottish governments have formally recognised the cost-of-living
crisis and have deployed emergency measures to help mitigate the impacts of rising
costs. 
3.3. On 21 September 2022, the Executive Committee noted a package of cost-of-living
supports to a value of £92m with nearly £3m from new measures in 2022-23.  New
supports included a Financial Wellbeing Support Fund and support for energy costs,
both funded by the Local Authority COVID Economic Recovery Fund (Elected Member
briefing April 2022) and a proposal to write off school meal debt.  Existing supports
included the council’s Money Matters Advice Service, the Scottish Welfare Fund and
support for tenants. 
3.4. On 30 November 2022, the Executive Committee noted, in terms of Standing Order
No 37 (c), the action taken by the Chief Executive, in consultation with the Chair and
an ex-officio member, to progress a range of initiatives to further support households
and the funding of £4.680m allocated to deliver them.  Initiatives included free
6
37

Page 38

community lets to all community groups, free swimming sessions for under-16s,
support for foodbanks and a looked-after children payment. 
3.5. This report provides an update on the position for 2022-23 against the wide range of
support activity undertaken and an outlook for 2023-24. 
4. Cost-of-Living Support (Executive Committee 21 September 2022)
4.1. Financial Wellbeing Support Fund
4.1.1. The Financial Wellbeing Support Fund was launched in June 2022 by the Money
Matters Advice Service (MMAS), with the purpose of the fund to help assist with
recovery from Covid 19 and help mitigate some of the worst effects of the cost-of-living
crisis, by providing cash payments of £250 to the most vulnerable households. 
4.1.2. It aimed to do more by linking payments and access to the fund with clients receiving
welfare benefit, debt and energy advice.  The aim was to not just provide service users
with cash payments, but also provide advice to build financial resilience. 
4.1.3. From the launch of the fund until the end of the financial year, it supported 5,137
households, distributing £1.2m in funding to households. 
4.1.4. A partnership approach was taken to the fund, so applications could be made by
MMAS, SLC Housing and the four South Lanarkshire Citizen Advice Bureaux. The
fund is expected to finish in June 2023 by which point it is forecast to have supported
over 6,000 households with a spend of £1.625m against an allocation of £1.640m. 
4.1.5. Given the success of the fund in distributing cash to households coupled with advice
and support, it is proposed to re-direct funding earmarked for the provision of energy
vouchers in 2023-24 to a further round of wellbeing payments.  It is estimated that
£0.425m will be available for this, available from the original Local Authority COVID
Economic Recovery Fund (LACER) fund allocation.   
4.1.6. The value of the payments will be £50 to ensure the funds are able to support many
more families. It is estimated the funding will support 4,250 families per year over the
course of the next two years. A new arrangement has been set up the Fuel Bank
Foundation to allow referrals to be made for the provision of energy vouchers,
therefore ensuring support can continue to be provided. This will be at no cost to the
council. 
4.1.7. Two temporary MMAS advisors were added to the team at a cost of £0.080m, covering
2022-23 and 2023-24.  This additional capacity helped to ensure more households
benefitted from advice and support on maximising income through claiming benefits
and managing debt.  Full spend is expected. 
4.2. Energy Support
4.2.1. The MMAS has also been delivering an energy voucher scheme in conjunction with
the Wise Group for households on prepaid meters. By the end of May, over 8,000
vouchers had been issued. This activity will continue to the end of August 2023.  Any
underspend is proposed to be ringfenced for further support activity through the
Financial Wellbeing Support Fund, as referenced in section 4.1. 
4.2.2. Two dedicated Energy Advisors at a cost of £0.075m supported households in
managing their energy costs and consumption. From being employed in September
2022 until the end of the financial year, the Energy Advisers dealt with 561 unique
clients and opened 1,035 cases, of which 351 were energy cases. They generated
38

Page 39

£226,220 in total calculated financial gains for their clients (average gain per client
was £403). Full spend is expected. 
4.2.3. The Capped Meter Fund supports social rented tenants who are struggling to pay their
utility costs and who have had their pre-payment meter capped. This often happens
when the annual gas safety check is being carried out and there is no credit in the
meter. This means the service cannot be completed and the gas supply is
disconnected. 
4.2.4. The Capped Meter Fund is used to clear the tenant’s debt on the meter and allow a
limited provision of gas to be supplied, enabling the meter to be uncapped and the gas
safety check to be completed. The main aim of the fund is to prevent households being
disconnected from the gas supply. 
4.2.5 The £0.050m which was allocated to the fund allowed Housing Services to purchase
energy vouchers that were issued to vulnerable tenant households, allowing them to
clear their meter debt, have their gas service completed and prevented their gas
supply being disconnected/capped. Spend of £0.045m was achieved against an
allocation of £0.050m. 
4.3. Education Advice Project
4.3.1. Two full time equivalent (FTE) Family Wellbeing Assistants were based in two schools
– Calderside Academy and Lanark Grammar. These two schools were selected
following consideration of deprivation levels and provided one urban setting and one
rural setting. 
4.3.2. Despite considerable investment by MMAS staff, the project did not receive the volume
of referrals hoped for.  In December, the staff were, therefore, redeployed into MMAS
to assist in meeting the rising demand the service was experiencing. It is believed, as
MMAS is a well-established service, parents/carers prefer to contact MMAS through
traditional pathways. The low numbers of parents and carers entering the schools
because of changing behaviours following COVID-19 was also considered a
contributing factor in the low numbers of referrals. 
4.3.3. Full spend of £0.065m was achieved, acknowledging an element of this cost was
attributed to supporting activity in MMAS. 
4.4. Other Support
4.4.1. Digital Inclusion
The Digital Inclusion fund was established to help residents, particularly in high
Scottish Index of Multiple Deprivation areas, access services digitally. The fund has
targeted community centres and libraries in Neighbourhood Planning areas to assist
families which are homeless or which may otherwise be unable to afford broadband
access from homes. A fund of £0.120m was allocated. 
Facilities that have received funding to improve public Wi-Fi are:- 
 Blantyre Library
 Burnbank Burgh Hall/Library
 Fairhill Integrated Facility
 Halfway Library
 Hillhouse Community Centre/Library
 John Wright Sport Centre
39

Page 40

Funding was also used to improve the accessibility of the council website for visually
impaired users, whilst also providing translation capability in 130 languages including
Gaelic and to provide support for greater interaction through social media channels.
Improvements to public Wi-Fi at Blantyre Leisure Centre are currently being planned,
and applications to install Wi-Fi at Smyllum Resource Centre (Healthy Valleys) and
Crawford Village Hall (Crawford and Elvanfoot Community Council) have also been
approved. Full spend is expected.
4.4.2. Lived Experience Funding
The Community Planning Partnership Board approved the distribution of the Lived
Experience Fund to Cambuslang and Rutherglen and Clydesdale Community
Partnerships in September 2022. The Community Partnerships have each met three
times since then. As this is a new process for the Community Partnerships, they have
both taken time to develop their governance arrangements. No funds have been
committed yet, but several projects are at the development stage, and it is expected
that the additional funds of £0.006m will be committed in the autumn with full spend
expected. 
4.4.3. Money Matters – Employability Advisor
As a result of the provision of temporary funding from the Employability Service, the
MMAS recruited a designated Employability Advisor. The advisor opened 455 new
cases by the end of the 2022-23 financial year, dealing with 281 unique clients. 40%
of unique clients were found to be living in poverty. The advisor achieved total annual
benefit awards of £0.170m and dealt with £0.024m of debt. Full spend is expected
against the funding of £0.060m. 
5. Existing Council Support for Households
5.1. Money Matters Advice Service
5.1.1. Since April 2022, the MMAS has been implementing several measures to improve
services for residents and to increase capacity to deal with the impact of the cost-of-
living crisis. 
5.1.2. One of these changes has been the introduction of a new case management system
that allows more detailed and improved reporting, case management and an improved
workflow system. Changes have also been made to the categorisation of enquiries to
allow more accurate reporting. 
5.1.3. In 2022-23, there were 2,825 unique clients who sought debt advice and 3,256 Debt
Cases/Enquiries. There were also 12,324 unique clients who sought benefit advice
and 30,724 cases. The summary position for the year for welfare support cases is
provided below: 
Financial Gain Type Total Calculated Financial
Benefit
As a % of the
Total
Welfare Benefits £24,301,008.98 88.00%
Financial Wellbeing Support
Fund
£975,616.37 3.53%
Emergency Top Up Vouchers £624,313.00 2.26%
Debt Write off £1,713,307.01 6.20%
Total £27,614,245.36 100.00% 
5.1.4. In 2022/2023, MMAS dealt with £7.47m in problem debts. 30% of this was debt owed
to South Lanarkshire Council. This, however, should not be seen negatively, but rather
40

Page 41

that the positive working relationship MMAS has with Benefit and Revenues and
Housing is paying off, with more residents being referred and self-referring for help
from MMAS. 
5.1.5. Other improvements have been the move to one helpline number for the service and
the centralisation of call handlers. A new upgraded telephony system is now also
introduced to improve the call management information available. 
5.1.6. 98% of all clients now contacting MMAS are receiving advice through non-in-person
advice delivery methods, with the main contact route being telephone based.  This is
significantly different to the pre-covid landscape where most clients received in-person
advice. With the change to mainly telephone based appointments, clients have not
been required to travel to council offices and, importantly, this more efficient way to
deliver the service has allowed more clients to be supported. Face-to-face
appointments are still available should a client request one. 
5.2. Scottish Welfare Fund
5.2.1. There continues to be significant demand for grants from the Scottish Welfare Fund
(SWF) with applications for crisis grants remaining at the record levels experienced
during the Covid-19 pandemic due to the cost-of-living crisis. Grants to a value of
£3.412 million were awarded in 2022-2023 with the award rate of 62%, 2% lower than
in 2021-2022. 
5.2.2. Through the Scottish Government allocation in 2023-24, the SWF continues to provide
support to individuals and families on benefits or on low incomes. 
5.3. Support for Tenants
5.3.1. Housing Services continue to support council tenants with rent arrears by providing
financial assistance through their successful Tenancy Sustainment Fund, sustaining
tenancies and preventing homelessness.  During 2022-23, in addition to the council’s
Tenancy Sustainment Fund allocation, additional financial support of £0.379m from
the Scottish Government through the Tenant Grant Fund (£0.029m) and LACER Fund
(£0.350m) was also made available to tenants across the social and private rented
sectors, who were financially impacted by the Covid-19 pandemic, in rent arrears and
at risk of eviction. Both the Tenancy Sustainment Fund and the additional funding from
the Scottish Government were fully utilised by year end. 
5.3.2. To ensure tenants are aware of the supports available, the Resource continues to
promote the advice and assistance which is available to tenants through the council’s
social media platforms and in the Housing News, which is issued to all council tenants. 
5.3.3. There remains a continued pressure on the council’s Homelessness Service to provide
permanent accommodation and support households experiencing homelessness,
particularly as homeless applications continue to increase, both nationally and locally.
Households which are experiencing homelessness continue to be vulnerable to
financial insecurity and hardship, particularly during the continuing cost-of-living crisis. 
5.4. Provision of Benefits
5.4.1. The council also provided the following additional benefits to support low-income
households in 2022-23:
 Council Tax Reduction (£21.917m) with 30,139 households supported
 Free School Meals (£1.544m) with 9,544 school pupils provided with Free School
Meals – Holiday Support payments 
 School Clothing Grants (£1.751m) with 12,672 clothing grants awarded
 Discretionary Housing Payments (£0.938m)
41

Page 42

 Housing Benefit (£59.194m) 
6. School Meal Debt
6.1. School meal debt of £0.100m was identified for consideration of write-off by Education
Resources. A total of £0.077m has now been approved for write-off following
consideration by the Finance and Corporate Resources Committee.   
6.2. On all remaining school meal debt, Education Resources is working with schools to
review amounts owed for school meals.  This exercise is being done with the utmost
sensitivity and will identify further cases where write-off of debt is appropriate. 
6.3. There continues to be joint working within the council by Community and Enterprise
Resources providing the school meal service and Education Resources to support
families and signpost all supports available. The council continues to provide a school
meal for all children who require one, even if they are unable to pay on the day. 
7. Cost of Living Crisis – Additional Supports (Executive Committee 30 November
2022)
7.1. Investments and Initiatives 
7.1.1 As part of the Warm Welcome Initiative South Lanarkshire Leisure and Culture (SLLC)
played a role in providing additional community provision, specifically around free lets
to community groups and free swim sessions for Under-16s. 
7.1.2 As reported to the Executive Committee in November there were, already provision
made within the council’s budget for 2022-23 to pay £1m to SLLC in respect of lost
income from the pandemic that would be met from Covid funding carried forwards.  As
of November, it was reported that there was likely to be a further shortfall in income
within SLLC’s activities for which there was no further money budgeted within the
council to pay SLLC more in 2022-23.  The in-year pressures faced by SLLC, while
recovering from the impact of the pandemic, were such that without increased funding
from the council, there would be a risk that  SLLC would not have been financially
stable enough to meet its obligations and continue its business for the remainder of
the year. 
7.1.3 It was agreed that a further payment could be made by the council as part of its Warm
Welcome Initiative, and on paying an additional amount of £3m to SLLC (£1m already
included in the budget, plus an additional £2m), the council would ask SLLC to make
additional community provision. Providing extra funds enabled SLLC to keep all
facilities that were operating at that time open through the winter period and available
for the community to access. As a result, people across our communities had open
access to warm space within SLLC-run facilities, throughout winter 2022-23.   
7.1.4 A key part of SLLC’s response to the Warm Welcome Initiative was to make available
space within libraries and this was actively publicised through online and physical
media channels. SLLC library staff have highlighted the extensive use made of library
spaces by individuals and families during this period.  An additional part of the
response was to introduce Stay and Play sessions, where families were encouraged
to stay for a warm drink and access to books, games and toys after Bookbug sessions,
which again would not have been available without the support of the Warm Welcome
Initiative.  Between November 2022 and March 2023, Bookbug sessions attracted over
13,000 children and almost 12,000 adults.  General use of the Stay and Play sessions
was monitored, and feedback gathered from library staff reported that uptake was high. 
7.1.5 Additionally, halls and leisure centres offered free lets to community groups in
exchange for opening their doors to members of their communities to join in their
42

Page 43

activities.  Some existing community groups also promoted the Warm Welcome
Initiative and additional members of the public were able to attend as a result of this. 
Across halls and leisure sites, 1,365 events were delivered under the Warm Welcome
Initiative. Appendix 1 provides some case studies illustrating the benefits experienced
by community groups as a result of the initiative. 
7.1.6 Free swims were offered to under-16 residents and families were able to participate
together in a healthy activity at a reduced cost with only the adults paying. Children
aged 8 to 15 were able to attend our warm, free and safe environments without a
supervising adult, giving parents peace of mind. Customers could stay for as long, or
for as short, a period as they wanted. Providing warm showers at our nine pools was
extremely beneficial at a time with increased energy costs and the rising cost-of-living. 
26,931 free swims were recorded between November 2022 and March 2023. 
7.2. Support for Foodbanks
A total of 57,709 people have been supported through foodbanks in 2022-23. 
Compared to the available figures from 2021-22, there has been a 45% increase in
people being fed through emergency food parcels. There have been 31,929
households supported, with 35,971 adults and 21,738 children.  Compared to the
available figures from 2021-22, there has been a 19% increase in households referred
to local foodbanks, including a 45% increase in adults and a 33% increase in children. 
The £0.100m available was provided to all of the operating foodbanks in South
Lanarkshire based on size and activity levels. 
7.3. Extend School Meal Payments to Weekends
As part of a package of measures aimed at providing additional financial support to
households during the cost-of-living crisis, the council agreed to provide cash
payments to households with children in receipt of free school meals to cover weekend
days from the beginning of November 2022 up to the end of March 2023. 
A total of 9,544 school pupils were provided with Free School Meals – Weekend
Support payments in 2022-23 at a value of £0.959m. 
7.4. Energy Support Payment 
An additional £0.425m was allocated to the provision of support for households with
prepaid meters.  Including the original contract value, it is estimated this funding will
support the provision of up to 12,400 vouchers. 
7.5. Looked After Children
Activity covered three distinct areas with a total cost of £0.112m against the funding
allocation of £0.135m. 
As intended, Who Cares Scotland utilised the £40,000 for A Winter Wishes
Programme, the outcomes of which assisted:
 207 people supported by the fund, the majority of whom lived in their own tenancy
 17 families with care experienced parent directly supported
 5 new partnerships agreed with national retailers to support delivery of wishes at
pace
 New food larder in the HUB (Jimmy Swinburne Centre) allowing care
experienced young people quick access to food without reliance on foodbanks.
 25 staff and volunteers involved in delivering winter wishes 
43

Page 44

The Winter Wishes offer consisted of 3 tiers of support, allowing 605 young people to
be supported totalling £60,500 with direct funding to the carer (foster/ kinship/ family
carers) across: 
 Tier 1 - £250 voucher of choice (families)
 Tier 2 - £150 voucher of choice
 Tier 3 - £50 voucher of choice or alternative payment (for example, custody
payments) 
For those children looked after at home with parents who met the criteria for the £100
payment, 109 children across the four localities were supported with £0.011m of
funding. 
8. Outlook
8.1. The significant pressure on household finances is expected to continue throughout
2023-24 because of food price inflation and rising interest rates. The demand for
welfare advice and support services is, therefore, expected to continue to be
significant. 
8.2. The council will continue to provide support from the range of services and budgets
available. However, the financial challenges councils are facing are a limiting factor in
the level of support that can be provided to households in South Lanarkshire. 
9. Employee Implications
9.1. An additional 2 FTE Money Advisors, 2 FTE Energy Advisors and 1 FTE Employability
Advisor were recruited on a 12 month basis to supplement the resources available to
the service. An additional 4 FTE were also allocated to the Scottish Welfare Fund, also
on a 12 month basis to support the provision of crisis and community care grants.
These arrangements will come to an end in 2023. 
10. Financial Implications
10.1. The financial implications of providing the range of support described are presented
throughout the report and were met from existing budgets and from funding through
the council’s LACER allocation from the Scottish Government. 
11. Climate Change, Sustainability and Environmental Implications
11.1. There are no direct climate change, sustainability and natural environment implications
arising from this report. 
12. Other Implications
12.1. While the council has provided a broad range of support throughout 2022/2023 with a
significant level of financial resources, the actions outlined in the report could not be
sufficient to fully mitigate the worst effects of the cost-of-living crisis experienced by
many households. This reflects the scale and depth of the crisis and the need for
significant input from other sectors such as governments and the energy sector. 
12.2. The ability of local government to provide further mitigation remains heavily reliant on
the responses from both UK and Scottish governments and the severity of the
economic conditions that are experienced. 
13. Equality Impact Assessment and Consultation Arrangements
13.1. There is no requirement to equality impact assess the content of this report. 
Paul Manning
Executive Director (Finance and Corporate Resources)
44

Page 45

4 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk  
45

Page 46

Appendix 1
Warm Welcome Initiative 
Case Studies 
Case Study 1
Hand Made Arts and Crafts meet each Wednesday in Uddingston Community Centre but
faced having to give up their sessions as the impact of the pandemic and cost-of-living
crisis continued to affect communities across South Lanarkshire. 
The Warm Welcome package agreed by the council helped SLLC keep venues open and
widened the number of spaces available. 
This allowed the long-standing Hand Made group, which mainly comprises older women, to
keep their meetings going and also attract new members. 
Margaret Paterson, who has run the group for more than six years, said: “Knowing that we
could keep our meetings going, even bringing in new members, during the winter was
fantastic for us, especially coming out of years of lockdowns which meant so many had no
choice but to be at home.” 
Case Study 2
The Men’s Shed Group at Carluke Leisure Centre had a regular weekly booking at Carluke
Leisure Centre when they signed up to the Warm Welcome Initiative. During that time on
average around 20 members attended each week. 
Gerry Howley, the chair of the Men’s Shed, said: “The high cost of energy bills was an
increasing problem for all the group’s members. So, taking part in the initiative allowed us to
continue to meet and stay warm at no cost to our members. The initiative has helped our
group stay together.” 
The group continues to use the centre every week. 
Case Study 3
A Hamilton-based church group continues to thrive in its home of almost 45 years thanks to
the Warm Welcome initiative. 
The Ferniegair Christian Spiritualist Church was established in 1978 and creates an open
and welcoming environment with a service every Sunday and weekly meetings on a
Tuesday in Ferniegair Hall, Hamilton. 
Chairman Harry Boyd said: “Following lockdown and then some improvement works to the
hall we had been away from our home at Ferniegair for almost three years. We had just
started to settle back in in September last year when we heard there might be a need to
close again because of tight budgets. 
“It was a real worry for us, to potentially lose access again to the place where our group
finds peace and calm and togetherness. So, for the Warm Welcome initiative to kick in
when it did really took away that worry, and gave us the certainty to keep our doors open to
all.” 
Case Study 4
Before the Warm Winter Initiative, the ABC Tiny Tots had recently attracted more members
to their events in Greenhills Community Hall, East Kilbride. However, they didn’t have the
46

Page 47

funds to maintain this for long and for the first time the group was hearing that people could
not afford to pay. 
Because of the initiative these issues were overcome. Numbers increased by at least 20
and remained at that level. Families were provided with an area to play, stay warm and
have lunch. The children had an area to sleep or nap, while adults had access to tea and
coffee and, most importantly in most cases, someone to talk to. 
Founder Maureen Dynes said: “We were concerned during this difficult financial time about
a number of people we had come across through our work, and the Warm Welcome
initiative helped us to help them. 
“Because of the Warm Welcome, we were able to help more people of our normal sort of
participants and many people who we wouldn’t have come across under normal
circumstances. It was wonderful to see the difference we could make.” 
Case Study 5
Thanks to Warm Welcome, the Machan Trust was able to provide additional food and
activities in a warm place – Larkhall Leisure Centre. 
Chief Executive Officer Fiona Dryburgh said: “We were able to provide food at every group
we run in order to allow children, young people and families to attend, have dinner/lunch etc
in a warm place.  This saved families from paying food, cooking and heating costs, at a time
when they were perhaps struggling in this cost-of-living crisis. 
“The Machan Trust used the funding to meet the increasing demand for our activities.  We
were working with around 800 people a week.  Over 52 weekly groups, not including our
breakfast clubs. 
“These groups provided a warm space, food, and activities and were open to all.  This
increased to around 900 people a week.” 
47

Page 48

48

Page 49

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 16 August 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Job Evaluation – Back Pay 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Committee of the cost of paying the back dated element of the
recently agreed Home Carers Job Evaluation and propose a funding package
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the estimated costs of back pay for Home Carers of £18 million that will be
accounted for in 2022/23, be noted;
(2) that the funding solution detailed at Table 1 be noted;
(3) that the one-off payment in 2022/23 to the Health and Social Care Partnership
(HSCP) from uncommitted service concessions towards the funding solution
(£2.2 million) – Table 1 line 5 be approved; and
(4) that the one-off payment to the HSCP to reimburse Integration Joint Board (IJB)
reserves in 2023/24 totalling £7.2 million, as detailed at section 5 and Table 2
including reserves, unallocated underspends, uncommitted service concession
funds and covid funds be approved. 
3. Background
3.1. As reported to the Executive Committee (21 June), a basis has been established for
backdating the Job Evaluation outcome for Home Carers to October 2020. The
Executive Committee was advised that the value of the back pay would take some
time to calculate, however, these costs would require to be included in the financial
position for 2022/2023. As the costs are in relation to Home Care, which is a delegated
service, these costs will fall under the IJB and will require to form part of their financial
accounts. 
3.2. In that paper, a commitment was made to quantify the full costs of back pay and a
funding package and report this back to the Executive Committee. 
4. Estimated Costs of Back Pay   
4.1.  The back pay payable to Home Carers will depend on the length of time an employee
has been in post since October 2020, and also whether the employee is in the pension
scheme, or has worked overtime.   There are also staff that have left, but who will be
entitled to claim back pay for the period of time they worked since the start of October
2020.   
7
49

Page 50

4.2. A detailed estimate of £18 million has been made of the overall costs of back pay for
current staff and leavers.  The actual back pay will be paid in the September pay (1
September) . 
4.3. These costs are required to be accounted for in 2022/23.  Funding for these costs can
be met from the following areas detailed in Table 1 : 
Table 1 – Funding Solution – Home Carer Back Pay  
£m
1 IJB Underspend :
As covered in the Executive Committee on 21 June, the Executive
Committee (1 February 2023) had agreed that it would clawback a non-
recurring underspend from the IJB of £5.6 million and use this to help
with Children and Families pressures into 2023/2024. 
As Home Carer back pay now requires to be paid, the IJB will now not
underspend and this funding will be used to pay for Job Evaluation back
pay 
5.6
2 IJB Reserves : 
The IJB has £7.2m of reserves associated with the SLC partner that it
was planning on utilising to balance the IJB budget in 2023/24.  As the
Job Evaluation back pay will require to be funded in 2022/23, the IJB
reserves can be used to meet these costs in 2022/23.  This leaves a
shortfall for the IJB in 2023/24.  This is covered at section 5 
7.2
3 Additional IJB Underspend 2022/23 : 
In addition to the underspend detailed above, a further £0.3m of
underspend was reported by the IJB at the end of 2022/23.  This was
uncommitted, and, therefore, can be used to meet the Job Evaluation
back pay 
0.3
4 Council Reserves Set Aside for Home Care: 
At year end 2019/20, funds were set aside in Council Reserves for use
in future Budget Strategies including supporting the costs of transitional
change in the Care at Home Service. (Executive Committee 29 January 2020 / Executive
Committee 24 June 2020).  £2.7m of funding has not yet been drawn down, and
is currently uncommitted, and can be used to meet the costs of Job
Evaluation.   
2.7 
Sub Total  15.8
5 Council Service Concession Funds - Uncommitted Balance 
As covered in the Executive Committee (21 June - 2024/2025 Revenue Budget) there
is currently £18.535 million of service concession funding unallocated 
Papers previously presented to committee had suggested £15.1 million
of service concession money would be available as a corporate solution
for 2025/26 budget (South Lanarkshire Council meeting – 22 February - Overall Position of
Revenue Budget and Level of Local Taxation for 2023/2024 Appendix 2) 
This currently leaves £3.435m uncommitted and, therefore, £2.2 million
can be used to meet the costs of job evaluation in 2022/23 
2.2 
Total 18.0 
50

Page 51

5. One off Contribution to IJB to Reimburse Reserves 
5.1. As detailed in Table 1, the £7.2 million IJB reserves being used to cover the costs of
the back pay were intended to be used to balance the IJB budget in 2023/24.  Without
these reserves, the IJB will not be able to balance their budget this financial year and
an overspend will result.  It is, therefore, proposed that the Council provides a one-off
contribution to the IJB of £7.2 million. 
5.2. It is proposed that part of this contribution is made from funds currently held in Council
reserves without any definite dates for utilising. Moving forward, if this funding is
required, we may have to look to borrow for the funds needed or look to future capital
programme to fund.  The total contribution proposed from these reserves is £4.7 million
This includes funds identified through analysis of the balance sheet which have been
there for a period of years, have not spent and there are no firm plans in the short to
medium term. 
5.3. There is also a currently uncommitted balance within Council reserves resulting from
the underspend identified as part of the probable outturn in 2022/23.  This was
referenced in the South Lanarkshire Council Budget paper (22 February 2023) which
reported at section 4.12 that, of the £4.696 million transferred to reserves to assist in
the 2023/2024 Budget Strategy, £0.756 million remained to meet the 2023/24 costs
of any savings presented for 2023/24 where the substantive savings are not
deliverable until 2024/25, should they be accepted.  As these savings were not
accepted, the funds remain unallocated. 
5.4. For the balance required of £1.7m, it is proposed that the remaining uncommitted
service concessions funding of £1.2m be used ( see table 1 (5)) alongside the final
balance of residual covid funding held in Council reserves  (£0.5m) 
6. Summary 
6.1. In summary, as detailed in section 4, the costs of the back pay in relation to Home
Carers’ Job Evaluation is estimated at £18 million.  The sources of funding for these
costs, that will require to be accounted for in 2022/23, are detailed in Table 1 above. 
This includes the Council making a one-off contribution to the HSCP, in 2022/23, of
£2.7m from Council Reserves identified for Home Care.  In addition, Members are
asked to approve the one-off contribution of £2.2 million from the services concession
funds.   
6.2. In addition, the Council is proposing to make a one off payment to the HSCP in year
2023/24 to replace the reserves that they have used to meet the costs of back pay
arising from the Job Evaluation outcome .  This is detailed in section 5 of this report
and this is summarised in Table 2 : 
Table 2 – One off payment to HSCP to replace IJB reserves :  
Description  £m
Use of reserves with no current date for spend
(section 5.2) 
4.7
Uncommitted underspend from 22/23 ( section 5.3) 0.8
Uncommitted service concessions ( section 5.4) 1.2
Unallocated Covid Funds  0.5
Total  7.2   
51

Page 52

6.3. The funding solution noted in this paper does not use any of the funding solution
identified to support the 2024/25 and 2025/26 budget strategy.  This leaves the
solutions previously identified in those years intact. 
7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. The financial implications are as detailed in sections 4 to 6 of the report. 
8.2. At section 5.2, there is reference to a potential requirement to borrow to replace
funding being used for the Job Evaluation back pay.  As there are no current
commitments for these specific reserves moving forwards if this funding is required, it
would be unlikely to have any financial implications before 2025/26.  If borrowing of
£4.7 million was required to be taken, annual costs to the revenue budget will change
annually due to the way we have to account for these.  The maximum annual cost of
repaying this borrowing would be £0.470 million per annum. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Other Implications
10.1. The main risk associated with this paper is the value of the back pay that is payable. 
This has been mitigated through the detailed estimated calculations carried out using
details of current staff, and leavers.   
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
11.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
26 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 19 May 2023. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
52

Page 53

Jackie Taylor, Head of Finance (Strategy) 
Ext:  5637 (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk
53

Page 54

54

Page 55

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 16 August 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Land and Property Transfers and Disposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose
 advise the Executive Committee of the actions required in respect of land and
property transactions
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the land and property as detailed in Appendix A be transferred between
Resources; and
(2) that the land detailed in Appendix B be declared surplus to Council
requirements.
[1recs]
3. Background
3.1. Details of Council land and property, which is potentially suitable for redevelopment or
disposal, are circulated to all Resources and Community Planning Partners to
establish if they are suitable for alternative operational use. 
3.2. The recommendation for the transfer between Council Resources, of the assets
detailed on Appendix A, is made following the consideration of planning, title and other
legal constraints and Council priorities.   
3.3. Transactions where there is a requirement to declare land surplus to enable
negotiations for minor or adjoining sales to progress are detailed on Appendix B. 
3.4. These transactions are only included in the report after successful consultation with
the Holding Resource(s) and Planning. 
4. Property Transactions
4.1. The former Ballgreen Hall, Strathaven, was included in Property Bulletin 18/01 and
transferred to the Corporate Land Bank for disposal at the Executive Committee on 25
September 2019. The property was then subject to a Community Asset Transfer
application which was subsequently withdrawn by the community group. Following
this, Housing Services expressed an interest in the land for inclusion in the New Build
Programme. Following an appraisal of the site, Housing have now requested that it be
transferred from General Services to the Housing Revenue Account (HRA) for this
purpose. The details of the proposed transfer are contained in Appendix A.
8
55

Page 56

4.2. The schedule shown within Appendix B identifies a proposed transaction where the
holding Resource and Planning have agreed to the release of a minor area of land for
disposal. The Committee is asked to approve the recommendation that this area of
land is declared surplus to the Council requirements in order that the Estates Section
can conclude negotiations for its disposal. 
5.  Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. In terms of Scottish Government Guidance, a disposal of land from the Housing
Revenue Account must be done at the best consideration that the site could
reasonably be expected to achieve. 
6.2 The minor disposals will generate a capital receipt for the General Services account. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no issues in relation to climate change, sustainability and the environment
contained within this report. 
8. Other Implications
8.1. There is a low risk that the capital receipts anticipated, as a result of declaring
properties surplus, may not be realised if, for reasons out with the Council’s control,
the purchasers choose not to proceed with the transactions.  However, the procedures
and consultations described in Sections 3 and 9 of this report have been implemented
to minimise this risk. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
9.2. Consultation was undertaken with Planning, Roads, Legal, and Housing Services. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Achieve results through leadership, good governance and organisational effectiveness 
Previous References
 Executive Committee 25 September 2019 
List of Background Papers
 Plans of the land and property referred to in this report.  
56

Page 57

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk  
57

Page 58

APPENDIX A 
TRANSFERS 
Area Description Previous
Account
New
Holding
Account
Transfer Value
Band
1,755 sq m Former Ballgreen Hall,
Glasgow Road,
Strathaven 
General
Services
Housing
Revenue
Account
2023-24 3 
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
APPENDIX B 
DECLARE SURPLUS 
Area Description Holding Account Proposal Value
Banding
42 sq m 42 Pine Court, East
Kilbride
Community &
Enterprise
Garden Ground 4 
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
58

Page 59

59

Page 60

60

Page 61

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 16 August 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: South Lanarkshire Council Response to Pre-budget
Scrutiny Call for Evidence on Sustainability of
Scotland’s Finances 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the council’s response to the call for evidence issued by the Finance
and Public Administration Committee of the Scottish Parliament as part of the
pre-budget scrutiny process
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[]
(1) that the South Lanarkshire response to the call for evidence – attached at
Appendix 1 – be approved; and 
(2) that the response be submitted to the Scottish Parliament by the deadline of 16
August 2023.
[1recs]
3. Background
3.1. In recent years, in line with the recommendations of the Budget Process Review Group
report, Scottish Parliament subject committees have undertaken pre-budget scrutiny,
in advance of the publication of the Scottish budget. 
3.2. The intention is that committees will use pre-budget reports to influence the
formulation of spending proposals while they are still in development. In order to
facilitate this, committees are required to publish pre-budget reports at least six weeks
prior to the Scottish budget. The requirement to engage early in the budget process
with local government is reflected in the developing Fiscal Framework element of the
New Deal for Local Government jointly agreed between the Scottish Government and
COSLA. 
3.3. As part of its pre-budget scrutiny, the Finance and Public Administration Committee of
the Scottish Parliament issued a call for evidence on 28 June to inform its enquiry into
the sustainability of Scotland’s Finances. This inquiry will form the basis of the
committee’s pre-budget 2024/25 scrutiny, along with the evidence gathered from its
Public Service Reform inquiry. 
3.4. This report presents the council’s input to this call for evidence for Committee
approval.  
9
61

Page 62

4. The Pre-budget Scrutiny Call for Evidence
4.1. The focus of the Finance and Public Administration Committee’s enquiry is the
sustainability of Scotland’s finances in both the short and longer-term. 
4.2. The Committee notes the following key points as context to the enquiry: 
Short to medium term challenges
 the Scottish Government’s Medium-Term Financial Strategy published in May
2023 states that the Scottish Government expects its public spending to grow at
a faster rate than the funding it expects to receive
 this means the government is forecasting that it will not have sufficient money to
fund the spending it currently wishes to make
 Resource spending requirements could exceed the Scottish Government’s
central funding projections by 2% (£1 billion) in 2024/2025 rising to 4% (£1.9
billion) in 2027/2028
 the Scottish Government also states that its plans for capital spending are more
than the funding it expects to be available, with a 16% gap forecast in 2025/2026 
Longer term challenges
 the total Scottish population is projected to fall by 8% by 2072/2073
 based on current tax and spending plans, the Scottish Government expects an
average budget gap of 1.7% in each year during that period, the equivalent of
£1.5 billion in today’s prices
 the proportion of the population aged 65+ increases from 22% in 2027/2028 to
31% in 2072-73, while the population aged 16 to 64 and under 16 is falling
 these changes in the age structure have implications for the demand for public
services: with more demand for services used more by older people, such as
health, and less demand for those used more by younger people, such as
education. These changes will also have an effect on the size of the available
working age population and resultant income tax base 
4.3. With this context in mind, the Committee has asked for views on the following
questions:- 
1. How should the Scottish Government’s Budget 2024/2025 and its future budgets
respond to these challenges? 
2. Does the Scottish Government’s ‘three pillars’ strategic approach to managing
the public finances adequately address the scale of financial pressures expected
in the Scottish Budget 2024/2025 and in the medium-term? Should the Scottish
Government follow a different approach instead, and if so, why would that be
more effective? 
3. Given the pressures on the capital budget, how should the Scottish Government
prioritise its capital spend in the Scottish Budget 2024/2025 and over the
medium-term? 
4. What are the implications of a declining capital budget, including on the
productive capacity of the Scottish economy? 
5. The Scottish Government’s spending plans for resource (day-to-day spending
needed to run public services) and capital (investment in assets and
infrastructure) for 2024/2025 until 2026/2027 are to be updated and published
alongside the Scottish Budget 2024/2025 later this year.  Where should the
Scottish Government protect or prioritise spending in these multi-year plans?
62

Page 63

Please also indicate how these funds can be found, such as increased taxes or
reallocation of money from another portfolio. 
6. The Scottish Government plans to address the budgetary implications of the
expected long-term fall in population through growing the economy and tax base,
public service reform, and an upcoming ‘Addressing Depopulation Action Plan’.
Are these the right priorities to address the implications of this fall in the
population and, if not, how could the Scottish Government be more effective in
this area? 
7. How should the Scottish Government start to address the forecast funding gap
of 1.7% each year up until 2072/2073? 
8. How should the Scottish Government balance its short and long-term financial
planning and where can improvements in this area be made? 
9. How will long-term financial pressures impact on the delivery of national
outcomes and climate change targets and what steps can the Scottish
Government take to alleviate these impacts? 
10. In follow-up to the Committee’s inquiry on effective decision making, how can
transparency be improved around how the Scottish Government takes budgetary
decisions? 
4.4. The council’s response – attached in full at Appendix 1 – emphasises throughout the
unprecedented financial pressures faced by local government and makes the point
that any further reductions in budgets will have severe implications for councils’ ability
to deliver services.  This will, in turn, hamper the ability of councils to support Scottish
Government priorities and the achievement of national outcomes. 
4.5. Within the council’s response, Committee is asked to note the following key points: 
 Local authorities have a pivotal role in delivering the national outcomes,
especially those which are strongly influenced by how people experience their
local areas, communities and sense of agency and empowerment. Councils are
key to addressing the Covid catch-up and recovery. We provide assistance and
support across our areas across diverse services including education, early years
support and childcare, money advice, support into employment, housing and
homelessness services, and economic development.  Medium and long-term
strategies for funding the public sector should recognise this key role 
 reductions in budget and significant increases in costs over a sustained period
have significantly reduced the capacity of councils to continue to offer a range of
core services and respond to national issues such as the cost of living crisis and
carbon reduction. These pressures add significantly to the budget challenges that
have been experienced in the period since the financial crisis in 2008 – councils
have already had to implement high impact cuts in public services and in 2024-
25 will face the most severe cuts to date. Any further squeeze on council funding
will impact on councils’ ability to support these outcomes
 current funding arrangements limit the ability of councils to plan and invest in
dealing with long-term systemic challenges around poverty and inequality,
wellbeing, climate change, and the economic recovery following the pandemic.
Single-year budgets for Local Government restrict longer-term planning and, by
design, foster short-term interventions
 Local government is now facing critical pressures in funding, due to the
unprecedented level of inflation over the last 2 years, on top of many years of
63

Page 64

having to make savings/cuts.  Decisions that councils will have to take over the
next year will include cuts that will impact significantly on communities and
households at a time when they need the services provided by councils more
than ever.
 it is essential that government takes these unprecedented pressures into account
when making spending decisions, especially where they affect frontline council
services. For example - assess the consequence of any new initiative being
funded against cuts on money advice services, family supports, closure of halls,
leisure centres, libraries and other facilities 
4.6. As noted above, the Parliamentary Committee has issued its call for views as part of
the normal pre-budget scrutiny process.  The Committee will hear oral evidence in
September/October 2023 and will consider the draft report in early November, with a
view to publication shortly thereafter. 
5. Next Steps
5.1. The deadline for the call for views is 16 August 2023.  If approved by Committee, the
Council will submit the submission at appendix 1 as its response. 
6. Employee Implications
6.1. There are significant potential implications for staff across the council as a
consequence of decisions made about how to support the Scottish Government’s
priorities through the budget 2024-25. 
7. Financial Implications
7.1. There are significant potential financial implications for the council arising from
decisions taken in relation to the Scottish Budget 2024-25.  The response prepared
by the council underlines and scale and significance of the financial challenges facing
local government. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment implications
arising from this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. There are very significant risks to local
government arising from the decisions taken in the Scottish Budget 2024-25. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. Consultation was undertaken internally on the contents of this report. 
Paul Manning
Executive Director (Finance and Corporate Resources)
1 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective and efficient 
Previous References
 None
64

Page 65

List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
65

Page 66

Appendix 1 
1. How should the
Scottish Government’s
Budget 2024-25 and its
future budgets respond
to the challenges
below? 
• Challenges around
Inflation
• Post Covid catch up
(care / NHS etc) 
• Sustainability
agenda / Green
targets 
Local government is now facing critical pressures in
funding, due to the unprecedented level of inflation
over the last 2 years, on top of many years of having
to make savings/cuts.  Decisions that councils will
have to take over the next year will include cuts that
will impact significantly on communities and
households at a time when they need the services
provided by councils more than ever.
It is essential that government takes these
unprecedented pressures into account when making
spending decisions, especially where they affect
frontline council services. For example - assess the
consequence of any new initiative being funded
against cuts on money advice services, family
supports, closure of halls, leisure centres, libraries
and other facilities.
In addition to the fundamental points above, the
Scottish Government should seek an appropriate
balance between income generating options and
prioritisation of spend.  There are difficult choices to
be made here.  Cost of living pressures on the public
may motivate constraints on income generation,
however decisions on spending priorities (for
example through cutting LG funding or giving LG
funding allocations less priority than other sectors
such as NHS / police) will have significant
consequences on public wellbeing, outcomes and
inequalities. 
We would underline the key role that local
government plays in tackling these challenges and
mitigating adverse impacts on communities across
Scotland.  A wide range of services are engaged in
aspects of the post-Covid catch up, for example –
ranging from education, early learning and childcare
through financial inclusion and welfare services to
housing and housing support services. 
Equally, in terms of sustainability and a just transition,
local government has wide-ranging influence across
multiple domains relevant to the achievement of our
shared sustainability objectives – including planning,
land use and development management; flood risk
management; energy efficiency; waste management;
electric vehicle infrastructure; biodiversity and nature-
based solutions; regeneration, digital connectivity and
inclusion; economic development and business
support. 
Other than Scottish Government, Local Government
is the only part of the public sector with a footprint
66

Page 67

covering so many inter-related aspects of population
wellbeing, the economy and the climate change and
sustainability agenda. 
However, funding arrangements limit the ability of
Councils to plan and invest in dealing with long-term
systemic challenges around poverty and inequality,
wellbeing, climate change, and the economic
recovery following the pandemic. Single-year budgets
for Local Government restrict longer-term planning
and, by design, foster short-term interventions. In
addition, resourcing on an annual basis inhibits
effective service design, makes it more difficult to
recruit and retain people with the necessary skills,
and hinders procurement activity which leads to stop-
start service delivery. 
This was recognised by the Accounts Commission in
their ‘Local Government in Scotland Overview 2022’: 
"The ongoing absence of a multi-year financial
settlement creates uncertainty for councils at a time
when effective, robust financial management is
crucial. [Funding] on an annual basis… makes it
challenging for councils to plan and budget effectively
for the medium and longer term, and work with
partners to develop long-term plans to deliver better
outcomes and address inequalities." 
There is also a strong case for Scottish Government
to look at reducing its policy demands and recalibrate
those to be better aligned to the funding available.
We have discussed above the impact of cuts on local
government, however the Scottish Government can
reduce the cuts on local authorities by
reconsideration of their policy demands, leaving more
money for the essential core services that local
authorities need to provide.   
Alongside policy demand, councils have also faced
the challenge of requirements around “input” such as
minimum teacher numbers (or face financial penalty)
– these restrictions are exacerbating the critical
financial position in which councils find themselves.   
2. Does the Scottish
Government’s ‘three
pillars’ strategic
approach to managing
the public finances
adequately address the
scale of financial
pressures expected in
the Scottish Budget
The three pillars are:
 focus spending decisions on achieving our three
critical missions (equality, opportunity and
community – require us to tackle poverty; to build
a fair, green and indeed a growing economy; and
to improve our public services.).
 support sustainable, inclusive economic growth
and the generation of tax revenues. 
67

Page 68

2024-25 and in the
medium-term? Should
the Scottish
Government follow a
different approach
instead, and if so, why
would that be more
effective?
 maintain and develop our strategic approach to
tax
All of these are ambitions that seem fair and
reasonable.  This strategic approach is difficult to
argue with, however as the Medium-Term Financial
Strategy (MTFS) is demonstrating a significant gap, it
is still unclear on how these pillars will be used to
manage this gap. We are now dealing with a critical
financial crisis, and whilst these ambitions seem
reasonable (if broad) priorities to use as a framework.
it is suggested that there is a need to review the
expansive National Performance Framework.  The
three pillars are the focus of this question, but are
there other areas then that are considered less
important? If so, what are those less important areas
and how might the way they are approached assist in
the financial situation faced by local authorities?   
Local Government’s role is fundamental to tackling
child poverty, covering the broadest range of services
including employability, welfare and crisis support,
and housing, while services such as education,
childcare and transport that are also key to
supporting families to develop long term sustainable
solutions to the problems they face. 
Because fair and flexible work can provide a
sustainable route out of poverty for parents,
employability work led by Local Government, and
planned and delivered through Local Employability
Partnerships, is a critical contributor to reducing
levels of child poverty. The No One Left Behind
(NOLB) approach targets those who are unemployed
and most disconnected from the labour market, those
in low income and precarious jobs. 
Local Government critically provides welfare and
crisis support as well as money advice, rights and
advocacy (either directly or through funding
providers). Those services all help to mitigate the
impacts of poverty on families and support those on
lowest income manage increasing cost of living. 
Social housing is required to tackle child poverty.
Increasing the availability of affordable, energy
efficient social housing is important. 
As noted under Q1 above, Local Government has a
key role in creating a stronger, fairer and greener
economy and is a key driver of the local and national
economy. Councils have a rich experience of
addressing local needs effectively. That includes long
experience of supporting those furthest from the
labour market through employability support and
68

Page 69

track record of successfully driving down youth
unemployment through apprenticeships and job
creation schemes following the last recession. In the
Covid recovery phase, this support needs to be
continued and enhanced given the weight of
evidence on the pandemic impact on these groups. 
The economic footprint of Local Government is
considerable and should be a key strength for
delivering a Just Transition. In 2020/21, Councils
spent almost £480m on economic development and
tourism (this was made up of over £119m capital
spend and over £360m revenue spend). 
Local Government has a strong track record in local
economic development and business support, which
can be enhanced through help and guidance on safer
working practices to assist businesses to reopen, and
start-up support to create employment opportunities.
Local Government is in a unique position to help drive
demand in the labour market through effectively
aligning powers and investment to create new
additional jobs, with a specific opportunity to help
drive forward the green economy enabling improved
outcomes. 
Notwithstanding the points made above, there needs
to be sustainable funding for local government to
continue to contribute to  and deliver the sustainable
growth sought in the pillars above. 
3. Given the pressures on
the capital budget, how
should the Scottish
Government prioritise
its capital spend in the
Scottish Budget 2024-
25 and over the
medium-term?
From a local government perspective, capital grant
allocations have seen significant cuts in recent years
with almost 30% cuts in grant.  This has meant that
the replacement and renewal of assets is simply not
happening more often than not. This results in
increasing revenue costs to maintain and operate our
assets, so these become unaffordable and increase
the imperative to withdraw services and close
facilities. While councils can borrow, there is a hugely
reduced scope to fund borrowing through revenue
budgets. 
This cut in grant significantly reduces the ability for
councils to meet their core needs on capital
investment, but also limits the ability to consider
change programmes, or capital spend for
regeneration, or for meeting carbon targets. 
In our capital planning, priorities are keeping the
business running, and looking at any other
opportunity to spend to save revenue costs given the
outlook in terms of revenue budgets. 
69

Page 70

The Scottish Government should consider that the
priority is providing funding to allow us to keep
essential existing assets operational, and delivering
on key, core services.
4. What are the
implications of a
declining capital
budget, including on
the productive capacity
of the Scottish
economy?
As noted in response to Question 3 above, the impact
of reducing capital funding for local government is
that replacement and renewal of core assets is
massively compromised. The ability to maintain
assets is reduced, resulting in higher ongoing costs,
and service delivery is significantly at risk as our
assets age and deteriorate. 
As also covered in response to Question 5 below,
there is limited, if any, opportunity for us to use very
limited capital funding to contribute towards impacting
productive capacity of the Scottish economy. 
Investment allows Scottish productivity to improve,
and would also benefit councils in terms of allowing
spend on service change (and more fundamentally,
essential spend on our vital assets).
5. The Scottish
Government’s spending
plans for resource (day-
to-day spending needed
to run public services)
and capital (investment
in assets and
infrastructure) for 2024-
25 until 2026-27 are to
be updated and
published alongside the
Scottish Budget 2024-
25 later this year. Where
should the Scottish
Government protect or
prioritise spending in
these multi-year plans?
Please also indicate
how these funds can be
found, such as
increased taxes or
reallocation of money
from another portfolio. 
After many years of Local Government featuring
lower in the priority list than other public sector bodies
such as Health there has been a significant shift in
the share of funding allocated to public bodies.  The
impact on local authorities is stark – budget gaps for
future years are significant and delivering core
essential services is at risk unless further investment
is made. 
Limitations on ring fencing is a start for local
government to be able to locally prioritise what is
needed on the ground. 
In terms of where funding can come from, the
prioritisation of services will be key here, and the
MTFS does acknowledge that the Scottish
Government are not shying away from having to
make difficult decisions.  
In terms of “where should the Scottish Government
protect or prioritise spending”, there needs to be
some reflection on the impact of investing in
prevention and early intervention to ensure that there
is evidence that outcomes are positive. There is an
argument to be made that increased spending on
health on its own has not improved health outcomes
and that actually the increased demand for health
services is exacerbated by the loss of preventative
services offered by local authorities. Better outcomes
would result from prioritisation of the type of
preventative work in which local authorities can lead
and excel.
70

Page 71

The impact of a smaller share of Scottish
Government funding being provided to local
authorities, together with the current inflationary
climate, is that our potential to contribute through
preventative input is currently much diminished. The
scale of the issues facing councils as a consequence
of inflation is unprecedented, with levels of cuts for
council services at a level that we have never seen
before.   As things stand, what we expect to see over
the next 2 to 3 years goes well beyond the
diminishment of our critical role and our potential to
deliver on prevention.  In fact, we are likely to see
enforced widespread withdrawal from whole areas of
service which we currently support: leisure services;
community facilities; benefits and money advice
services; housing support services; community and
third sector grant support, etc.  Given the focus of
these types of services, withdrawal will inevitably
disproportionately impact deprived communities.
In view of the importance of climate change, we
would suggest spending priorities should include
action on energy infrastructure such as Air Source
Heat Pumps, especially district heating, Low and
Zero Carbon Technologies, waste heat.  Also
Investment in upgrading homes for energy efficiency
– insulation, draught proofing, ventilation etc,
investing in the right technologies in the right place to
maximise co-benefits including health and wellbeing.
6. The Scottish
Government plans to
address the budgetary
implications of the
expected long-term fall
in population through
growing the economy
and tax base, public
service reform, and an
upcoming ‘Addressing
Depopulation Action
Plan’. Are these the
right priorities to
address the
implications of this fall
in the population and, if
not, how could the
Scottish Government be
more effective in this
area? 
As a place-based leader, critical to joined-up service
delivery, Local Government is well-placed to be the
key partner in the Scottish Government's public
service reform programme. To fulfil this role, Councils
should be empowered to better support delivery of
more services locally, focusing on early intervention
and prevention, given their unique local knowledge
and local democratic accountability. 
Having delivered efficiencies for more than a decade
in response to real-terms cuts to core funding,
increasing policy direction from Scottish Government
and limits on Councils' ability to raise revenue, any
'easy' savings have been made – any further
reductions will have a major impact on services and
jobs. There is also the potential for over-estimating
the savings that can be made through, for example,
estate rationalisation – cuts to premises may lead to
higher costs and other negative impacts elsewhere,
for example as a result of reduced access to
services. 
To fulfil its role at the heart of public service reform, to
achieve further innovation and to maximise the
71

Page 72

positive impact of public spending, Local Government
requires fair and sustainable funding and greater
empowerment. This includes radical shifts towards
increased flexibility and fiscal autonomy, as well as a
whole-system approach and a focus on investing in
prevention. 
Crucially, the Local Government workforce – and that
of the public sector as a whole - must be valued if we
are to maintain excellent public services, and impacts
on staff must be a primary consideration when
assessing options for and implementing reform. A
decline in real-terms funding will lead to job
reductions and a loss of capacity, skills and expertise
– with consequential impacts on services within
communities. 
Demographic change is expected to lead to real
terms increases in costs in health and social care
(because of an aging population) and decreases in
costs in ELC, education and ultimately further and
higher education (because of falling numbers of
children).  Work by the Scottish Fiscal Commission
has concluded that overall, the projected cost
decreases as a result of demographic change over
the next 20 years do not fully off-set the cost
increases, with overall spending projected to
increase. 
Modelling by the Scottish Fiscal Commission
suggests that structural shifts in expenditure (from the
Education to the Health and Social Care portfolio)
would go some way in containing per head spending
growth over the next 20 years and that shifting
expenditure has the potential to make a significant
contribution to Scotland’s long term fiscal
sustainability. 
These implications of these conclusions require
investigation and consultation, to understand what
structural shifts might look like and the timescales
over which they might be achieved.
7. How should the
Scottish Government
start to address the
forecast funding gap of
1.7% each year up until
2072-73? 
As covered earlier in the response, it is suggested
that the Scottish Government must look at its
priorities and determine those that can  be managed
within the funding envelope available.  There is
reference in MTFS to health requiring 50% of all
devolved spend by 2072/73 due to population
expectations illustrates that this would not be a
sustainable position for local government (or other
public services) without a substantial change in
approach of delivery’ 
72

Page 73

Income generating options are obviously part of the
consideration (around tax / borrowing  / block grant
and other sources such as NDR). 
We believe there needs to be a renewed focus on
shifting balance of care and investing in prevention –
an aspiration which Audit Scotland points out is as
relevant now as when proposed by Christie. Recent
research points to a growing burden of ill-health as
demographic changes result in more older people
living with chronic health conditions.  It is not
sustainable to continue pouring money into the
existing model and radical change is needed.  Local
government has a role to play in the shifts required. 
8. How should the
Scottish Government
balance its short and
long-term financial
planning and where can
improvements in this
area be made?
This is similar to other questions and our responses
to those are relevant here. 
A core feature here is a fundamental review of all
spend commitments - including long standing areas
like free prescription charges and other universal
provisions. This would allow for improved targeting of
scarce resources and a focus on spend related to
core priorities.
9. How will long-term
financial pressures
impact on the delivery
of national outcomes
and climate change
targets and what steps
can the Scottish
Government take to
alleviate these impacts? 
Councils have a key role in helping deliver the
National Outcomes through action at a local level.  In
terms of climate change and sustainability, impacts
are increasingly evident and are most challenging for
those communities already experiencing inequalities
and poverty.   
It is important to raise the question whether the
Scottish Government's aspirations on sustainability
are achievable without funding to address the issue. 
Enhancing climate resilience, delivering on
sustainability commitments, and managing a just
transition to net zero all require significant change –
which in turn requires investment both now and in the
future.  The longer such investment is postponed, the
more costly climate adaptation will be in the long run. 
Specifically on climate change targets, this council
notes that an estimated £500million would be
required to “decarbonise” the council estate.  At
current investment levels, it will be impossible to
achieve the changes necessary to meet such targets
at a local level. 
Steps which can be taken include: Green upskilling
campaigns focusing especially on traditional fossil
fuel industries i.e. training gas engineers to install
heat pumps etc to address future skills gaps;
Awareness and training for local authorities to access
net zero investment opportunities; and exploration of
multi-year financing models and long-term
73

Page 74

commitment; , funding which isn’t sacrificed for short
term gains or caught up in bidding processes
between local authorities; Removal of competitive
bidding process, unlocking an equitable spread of
money across local authorities through a more
proportionate funding model. 
As we have noted consistently , councils are facing
unprecedented financial pressures that will have
significant impacts on the services that we will be
able to deliver in the future.  This will undoubtedly
restrict the ability of councils to deliver the services
which improve the National Outcomes.  Funding to
local government needs to be fair, sustainable and
flexible. 
Single-year budgets for Local Government restrict the
ability of Councils to plan and invest in dealing with
long-term systemic challenges around climate
change, poverty and inequality, wellbeing, and the
economic recovery following the pandemic. In
addition, resourcing on an annual basis inhibits
effective service design, makes it more difficult to
recruit and retain people with the necessary skills,
and hinders procurement activity which leads to stop-
start service delivery. 
Local authorities have long made the case for multi-
year settlements as one means of assisting longer-
term financial and service planning. Such multi-year
settlements are required more than ever given the
financial challenges ahead, so councils can tackle
these issues effectively and maximise the positive
impact of public spending, together with a focus on
broader outcomes rather than narrow inputs and
outputs. However, it must be understood that even
multi-year settlements will not prevent the significant
impact on services that lies ahead; rather they would
allow councils to better plan and prepare for the
reduction in services – and the consequences of this
on our communities and residents – over a longer
period.  
10. In follow-up to the
Committee’s inquiry on
effective decision
making, how can
transparency be
improved around how
the Scottish
Government takes
budgetary decisions? 
The Committee’s enquiry report notes that “A
consistent theme arising in evidence was the need to
shift the focus more away from firefighting to address
short-term issues to tackling longer term issues...”
(par 118, p.23) 
We would endorse this view – as referenced
elsewhere in this response – that a longer
perspective needs to be taken.  In relation to funding,
there is a need to support longer-term financial
planning and decision-making, which is undermined
by year-on-year settlements; and also to move away
from ring-fenced allocations which constrain
74

Page 75

innovation and flexibility to respond to local conditions
and priorities.  In relation to the longer-term
attainment of outcomes, a longer-term focus is
needed to support the long-term, systemic changes
required to shift to prevention. 
The way in which Local Government is funded in the
Scottish Budget provides a good example of how
there is currently a lack of transparency. The funding
provided from the Scottish Budget to Local
Government comes from different departmental
budgets within the overall Scottish Budget which
creates a lack of transparency, with very often no
clear lines showing what departments have set aside
for providing funding to Local Government. This leads
to an argument over what makes up Local
Government funding, what is core funding which can
be used flexibly, compared with departmental funding
lines which are provided with substantial
conditionality attached and little or no flexibility. There
is not the same strategic approach to Local
Government funding as there is in funding for the
NHS. 
Through a consultative approach and a longer-term
conversation about fiscal sustainability through the 
New Deal and Fiscal Framework it is hoped that the
outcomes for Local Government will improve. A
collaborative approach to budgeting would be
welcomed and needs to be extended further and link
with both the Programme for Government and the
development of manifestos. These should be ‘sense
checked’ against the priorities and outcomes and any
funding assumptions should be developed with
relevant partners. There are numerous examples of
announcements made prior to any engagement with
Local Government where it transpires that cost
assumptions are significant underestimates – for
example the expansion of Free School Meals. Local
Government must be engaged as early as possible. 
75

Page 76

76

Page 77

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 16 August 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Glasgow City Region City Deal – A72 Lanark Road /
M74 Junction 7 Signalisation – Revised Full Business
Case 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 advise on action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Community and Enterprise
Resources), in consultation with the Chair and an ex officio member, to approve
the revised Full Business Case (FBC) for the A72 Lanark Road / M74 Junction
7 Signalisation element of the Larkhall Community Growth Area City Deal
project
 advise Committee on the next steps in progressing the project 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following action taken, in terms of Standing Order No 37(c), in view of
the timescales involved, by the Executive Director (Community and Enterprise
Resources), in consultation with the Chair and an ex officio member, be noted:-
recs]
 approval of the revised A72 Lanark Road / M74 Junction 7 Signalisation
Full Business Case
 approval to seek grant funding in accordance with the City Deal Grant
Distribution Process outlined in the Assurance Framework in relation to the
delivery of the project with the precise arrangements to be agreed by the
City Deal Chief Executive’s Group (CEG) and City Deal Cabinet
[1r
3. Background
3.1.   The Council is one of eight local authorities who, with the UK and Scottish
Governments, are signatories to the £1.13 billion Glasgow City Region City Deal.  
3.2.  The City Deal is made up of a list of 20 key infrastructure projects that are intended
to collectively drive economic and inclusive growth across the Glasgow City Region
area. 
3.3.  Community Growth Areas (CGAs) is one of four South Lanarkshire projects among
the list of twenty. Larkhall Community Growth Area is one of four CGAs that have
been combined together form the CGA project – the other CGAs being located in
Newton, Hamilton and East Kilbride.
10
77

Page 78

3.4.  The Larkhall CGA comprises several individual education and transport
infrastructure projects which will be delivered over a timeframe of up to 10 years
which will in turn ‘create’ capacity to accommodate the increase in population from
housebuilding of up to 1750 residential units. The A72 Lanark Road / M74 Junction 7
Signalisation is the second of these projects to be brought forward to Full Business
Case stage at Larkhall CGA, the previous project being Glengowan Primary School
Extension which was completed in July 2022. 
3.5.  Governance arrangements for the City Deal initiative are defined within the
associated Assurance Framework. This sets out requirements for the development
of Business Cases for individual projects. The first level of business case was the
Strategic Business Case, and this was approved by the Executive Committee on 26
August 2015 and the second level business case, the Larkhall CGA Outline
Business Case, was approved by the Executive Committee on the 08 February
2017. 
3.6.  Full Business Cases for each project require to be formally approved via:-
 the City Region Member Authority Committee process
 the City Region Director of Regional Economic Growth has delegated powers to
approve this revised FBC. The City Deal Chief Executive’s Group will note that
this revised FBC has been approved via the delegated authority approval
process 
4.  Current Proposal 
4.1.  A Full Business Case (FBC) was produced for the A72 Lanark Road / M74 Junction
7 Signalisation element of the Larkhall CGA project and approved by Executive
Committee on 17 May 2023. The successful contactor subsequently withdrew from
the process post award. This revised FBC covers the next best submission tendered
for the two road junction improvements where the on / off slip road ramps from
Junction 7 M74 meet the A72 Lanark Road. 
4.2. The physical outputs from the project are:-
 2 new traffic light-controlled junctions at the M74/A72 on and off ramp slip roads
 2,300 sq. m of new carriageway created or improved via widening works/
resurfacing works
 improved LED Street lighting installed (40 columns)
 10,000 sq,m of existing carriageway improved
 2 new/improved vehicle restraint systems along the length of the M74/A72
overbridge parapets – total 210 lin. metres 
4.3. This revised FBC continues to make the case for the City Deal funding for Larkhall 
CGA  project in terms of:-
 Strategic Fit 
 Commercial Case 
 Economic Case 
 Financial Case 
 Management Case 
The Executive Summary of the revised FBC is contained in Appendix 1 
4.4. The production of the revised Full Business Case is the final City Deal approval
milestone for this element of the Larkhall CGA project and provides details of the
delivery and construction of the of the road junction woks.  
78

Page 79

4.5  The revised project cost is £2.245 million comprising £1.931 million City Deal funding
(86% share) and £0.314 million SLC funding (14% share). 
4.6. The approval of this revised Full Business Case will release funds to meet all these
costs. The construction contract is expected to commence on site in Sept / Oct 2023 
5.  Employee Implications 
5.1.  There are no direct employee implications from this project as existing resources
within Enterprise and Sustainability Services are currently tasked with the
management and delivery of this City Deal project. 
6.  Financial Implications 
6.1.  The project budget for the A72 Lanark Road / M74 Junction 7 Signalisation project
was previously approved at £1.98 million. As a result of the selected contractor
recently withdrawing from the process, the second placed tenderer is now  being
selected to implement the works at an increased project cost of £2.245 million. 
These project costs incorporate all construction related costs and community benefit
monitoring.  
6.2.  The City Deal funding element of the total project cost is 86% of the project 
cost (£1.931 million) with the Council contributing the 14% balance  (£0.314million). 
6.3.  The increased cost will be met by the current £0.3 million underspend at Newton
where all OBC outcomes have been achieved which involved the housing contractor
building the supporting green infrastructure to connect the CGA with the NCN 75 and
railway station. 
6.4. The revenue implications associated with this project have been included in the 
Council’s Revenue Budget Strategy for 2023/2024. 
7. Climate Change, Sustainability and Environmental Implications
7.1. Sustainability – The statutory processes associated with the approval of the Larkhall
CGA have considered the following sustainability agenda items and are subject to
monitoring and review as detailed proposals for each phase of the development
progress: - 
 consider active travel and sustainable transport links
 encourage the use of sustainable and recycled materials in construction
 support habitat connectivity 
 consider the lifecycle of the development
 support sustainable water resource management
 support sustainable waste management
 encourage energy efficiency through the orientation and design of buildings
 choice of materials and the use of low carbon generating technologie 
8.  Other Implications 
8.1.  Risk - The City Deal Cabinet has a Risk Management Strategy applied across all
City Deal projects. The purpose of this Risk Management Strategy is to provide a
systematic and effective method by which risks can be consistently managed. It
adopts a best practice approach, describes the specific risk management techniques
and standards to be applied and the responsibilities for achieving effective risk
management.  
8.2.  The Council is required to apply this City Deal Risk Management Strategy across
each of its City Deal projects to ensure consistency across all City Deal projects.
79

Page 80

This will be a key tool in mitigating project risks and thereby limiting our financial risk
associated with the Council’s 14% share of City Deal project costs. A robust
monitoring system has also been put in place to ensure that ‘early warnings’ are
provided, and appropriate action taken. 
9.  Equality Impact Arrangements and Consultation Arrangements
9.1.  This report does not introduce a new policy function or strategy or recommend a
significant change to an existing policy, function or strategy and, therefore, no impact
assessment is required. Consultation has taken place with relevant Resources within
the Council and the CGA developers. In addition, consultation was undertaken with a
wider community through the CGA planning process. 
David Booth
Executive Director (Community and Enterprise Resources) 
27 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Promote economic growth and tackle disadvantage.
 Improve the availability, quality and access of housing.
 Improve the road network, influence improvements in public transport and encourage
active travel. 
 Work with communities and partners. 
Previous References 
 Executive Committee, 26 August 2015 – City Deal – South Lanarkshire Council,
Community Growth Areas, Strategic Business Case, 
 Executive Committee, 08 February 2017 – City Deal – South Lanarkshire Council
Community Growth Areas, Larkhall Community Growth Area, Outline Business Case
 Executive Committee, 23 June 2021 – City Deal – Larkhall Community Growth Area,
Glengowan Primary School Extension - Full Business Case
 Executive Committee, 17 May 2023 - A72 Lanark Road / M74 Junction 7 Signalisation
– Full Business Case 
List of Background Papers 
 City Deal, Larkhall Community Growth Area – A72 Lanark Road / M74 Junction 7
Signalisation, Revised Full Business Case (FBC2) 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Ken Meek, Project Manager 
Ext: 5928 (Tel: 01698 455928) 
E-mail: ken.meek@southlanarkshire.gov.uk
80

Page 81

Appendix 1 
Glasgow City Region City Deal – A72 Lanark Road / M74 Junction
Signalisation – Revised Full Business Case 
Executive Summary
i. This Full Business Case 2 (FBC2) is for £2.245m City Deal funding – £1.931m City Deal (86%) and
£0.314m SLC (14%) – to enable signalisation of the M74 / A72 Lanark Road junctions at the Larkhall
Community Growth Area (CGA), accounting for Element 2 of the Larkhall CGA project proposal.  This
FBC continues to build the case from the Strategic Business Case (SBC) which secured approval for
£60.3m across South Lanarkshire’s four CGAs and from the Outline Business Case (OBC) which
secured approval for £20.15m City Deal funding to develop the Larkhall CGA project, comprising off-site
education, community and transport infrastructure.
The Strategic Case
ii. As presented in the OBC, there is a need for investment in offsite road infrastructure (and education/
community facilities) to allow the development of up to 1,750 new homes at Larkhall CGA. This project
is directly related to the creation of the initial development of 1,000 homes on the current CGA site that
has commenced construction with 310 houses built to date.
iii. The strategic aim of the M74 / A72 Lanark Road Junction Signalisation project element is:
“To deliver the off-site road infrastructure in a manner that enables delivery of the residential
development 10 years earlier than planned with associated economic and social benefits.”
iv. The planned outputs from the M74 / A72 Lanark Road Junction Signalisation project are:
- 2 new traffic light-controlled junctions at the M74/A72 on and off ramp sliproads
- 2,300 sq. m of new carriageway created or improved via widening works / resurfacing works.
- Improved LED street lighting installed (40 columns)
- 10,000 sq,m of existing carriageway improved.
- 2 new / improved vehicle restraint systems along the length of the M74/A72 overbridge parapets – total
210 linear metres. 
SLC will have ongoing responsibility for the management and maintenance of the improved junction, as
defined in the financial appraisal, the revenue operating costs have been estimated and are
acknowledged by SLC.
v. In advance of the CGA development receiving planning consent it was necessary to carry out a
transport assessment to consider the implications of developing up to 1,750 new homes at Larkhall
CGA.  This included a review of the existing road network capacity, the additional traffic generation
created and increased use of public transport by up to 4,829 new residents.
vi. As reported in the OBC (and evidenced in the development profiles at Appendix 9), the counterfactual
arrangement is that the CGA development will be less attractive to purchasers and it will take until 2042
to complete only 1,000 homes as opposed to 1,750 houses by 2032 with preferred intervention.
The Economic Case
vii. The economic case presents and tests a series of alternative options – including the counterfactual or
‘do nothing’ options, before a preferred solution that meets the identified needs and delivers Value for
Money for the public sector.
viii. The only viable options at FBC stage for M74 / A72 Lanark Road Junction Signalisation were around
the design and timing of the project proposal.  Through analysis of need and physical solutions, the
delivery of off-site road network enhancements at this key junction on the M74 / A72 Lanark Road
Junction was identified as the best option to achieve the project objectives. 
81

Page 82

The Commercial Case
ix. Delivery of additional capacity in the road network is identified as a critical requirement in delivering the
full CGA over 10 years by meeting the needs of the key partners – new and existing local residents (by
releasing capacity), SLC and City Deal partners (by delivering additional economic value) and
housebuilders/ house purchasers (by creating a more attractive development proposition).
x. City Deal funding has been identified as the only viable source for delivery of the critical off-site
enabling infrastructure works for Larkhall CGA (schools/ roads/community) needed to bring forward the
development earlier than planned.  The commercial arrangement for delivery of FBC2 is via
appointment of a contractor, through a competitive tender.
xi. This FBC2 is scheduled to be delivered on site during the autumn / winter of 2023/24 to ensure
continued progress by developers in delivering the CGA project to the desired timescales.  It follows on
from the completion of the extension works contained in FBC1 at Glengowan Primary School.
The Financial Case
xii. The estimated total City Deal cost of the Larkhall CGA project, submitted at OBC, was £21.50m (split
86% CD / 14% SLC) with potential additional leveraged investment of £12.85m from SLC, £17.5m from
Developers’ S75 obligations, and £193m housebuilding and associated on-site infrastructure costs
(Discounted).
xiii. Following a competitively tendered procurement exercise, the cost of delivering the M74 / A72 Lanark
Road Junction Signalisation project is estimated at £2.245m, accounting for 11% of the total approved
Larkhall CGA City Deal allocation.  The project works will commence on site in Sept/ Oct 2023 –
following approval of £21.5m City Deal funding at OBC stage, SLC has committed to carrying the
financial risk of any project cost overrun beyond the City Deal funding request for this project i.e. £2.245
m of City Deal funds.
xiv. SLC will take on the additional maintenance responsibilities at the new signalised junction, upgraded
carriageway etc. in perpetuity, following completion of the works.  These costs will be funded from
existing Council revenue and capital budgets, as the need arises.
xv. SLC has ultimate responsibility for cost over-runs beyond the level of financial budget/ approval for the
CGAs – an allowance of 25% was made for Optimism Bias within the cost profile for the whole CGA
investment programme.  The contract for this FBC2 has been awarded on a fixed price basis and
Optimism Bias for this element has therefore been reduced to zero.  Any VAT applicable has been
treated as recoverable.
The Management Case
xvi. The management and delivery of M74 / A72 Lanark Road Junction Signalisation project will be
contained within the remit of SLC’s CGA Programme.  Larkhall CGA will be managed by SLC in
accordance with the standards required by the City Deal governing principles.  Project roles have
been assigned to Senior Responsible Officer, Project Sponsor, Project Manager and an internal
Project Team.  SLC Enterprise & Sustainable Development Services will lead the delivery of the
project with SLC Roads & Transportation Services providing statutory services back-up as the works
will be adopted by SLC and Transport Scotland on completion. This joint approach ensures alignment
against other SLC CGA and Roads projects across the transport network.
xvii. SLC Enterprise & Sustainable Development Services will have responsibility for the long-term
monitoring and evaluation of the project benefits, including community benefits, in line with the
Monitoring & Evaluation Plan, using in-house resource and supplemented by external specialist
consultants as required.  The economic impact model developed to appraise the gross and net
benefits of the alternative options, allows for the activities to be measured and performance tracked
against the forecast profile.
xviii. The key objectives and critical success factors (as defined in the Strategic Case) have ensured that
the development of the Larkhall CGA is embedded in a holistic approach to sustainability –
environmental, economic, social and community – and the financial appraisal confirms that the project
82

Page 83

is financially sustainable, recognising the need for future (planned) investment by the private sector to
deliver the new houses.
xix. In summary the City Deal Larkhall investment generates the following results as per the OBC with this
project (FBC2) contributing 11% of the results: 
Criteria Measurement (Actual or 11% Proportion of CGA) Timescale
City Deal infrastructure Completion of transport corridor /M74  junction
upgrade works
By 2024
City Deal spend £2.25m (total nominal) – 86% City Deal / 14% SLC By 2024
Proportion of Larkhall
CGA development
Delivery of 193 houses, accommodating c. 492
residents (total direct for preferred option)
By 2032
Proportion of private
developer spend
Investment of £18.1m via construction of on-site
infrastructure/ residential units and S75 contribution
(total NPV for preferred option)
By 2030
Proportion of
construction impacts1
253 Person Year Equivalent – net additional annual
jobs
£24.8m net additional GVA at Scotland level
By 2031
Proportion of
operational impacts
Building up to 24 net additional FTEs – permanent
jobs
Building up over 25 years to generate total £4.8m net
additional GVA at Scottish level
By 2041 
1 Note: construction and operational impacts are based on the net additional – difference between the net impact for preferred
intervention less the net impact for the counterfactual intervention.
83

Page 84

84