Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 09 May 2023 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 17 May 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Lynsey Hamilton, Mark Horsham, Eileen Logan, Katy
Loudon, Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley McDonald,
Mark McGeever, Davie McLachlan, Richard Nelson, Mo Razzaq, Kirsten Robb, John Ross, David
Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Graeme Horne, Martin Hose, Susan
Kerr, Ross Lambie, Elaine McDougall, Norman Rae, Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 29 March 2023
submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Monitoring Item(s) 
3 Additional Funding from Scottish Government and Other External Sources
Report dated 26 April 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
11 - 14 
Item(s) for Decision 
4 Glasgow City Region City Deal – A72 Lanark Road-M74 Junction 7
Signalisation - Full Business Case
Report dated 27 April 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
15 - 22 
5 Update on Proposal to Conduct a Consultation to Realign the Catchment
Areas of Glengowan Primary, Machanhill Primary and Robert Smillie
Primary Schools, Larkhall
Report dated 28 April 2023 by the Executive Director (Education Resources). 
(Copy attached) 
23 - 32 
6 Outcome of the Review of the Safer South Lanarkshire Board
Report dated 26 April 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
33 - 38 
7 Land and Property  Disposals
Report dated 20 April 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
39 - 42 
8 Representation on Outside Bodies
Report dated 2 May 2023 by the Chief Executive.  (Copy attached) 
43 - 44 
9 External Representation on the Education Resources Committee - Update
Joint report dated 25 April 2023 by the Executive Directors (Education
Resources) and (Finance and Corporate Resources).  (Copy attached) 
45 - 46 
10  Recommendations Referred by  Resource Committees
Report dated 3 May 2023 by the Chief Executive.  (Copy attached) 
47 - 50 
Item(s) for Noting 
11  South Lanarkshire Leisure and Culture Strategy 2022 to 2027
Report dated 28 April 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
51 - 74 
Urgent Business 
2

Page 3

12  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 29 March 2023 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Maureen
Chalmers, Councillor Ross Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cooper,
Councillor Andrea Cowan, Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller, Councillor
Mark Horsham, Councillor Gavin Keatt, Councillor Susan Kerr (substitute for Councillor Eileen Logan),
Councillor Katy Loudon, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Catherine
McClymont, Councillor Kenny McCreary, Councillor Lesley McDonald, Councillor Mark McGeever,
Councillor Davie McLachlan, Councillor Richard Nelson, Councillor Mo Razzaq, Councillor Kirsten
Robb, Councillor John Ross, Councillor Graham Scott (substitute for Councillor Andy Carmichael),
Councillor David Shearer, Councillor Margaret B Walker 
Councillors' Apologies:
Councillor Andy Carmichael, Councillor Eileen Logan 
Attending:
Chief Executive’s Service
C Sneddon, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director
Education Resources
T McDaid, Executive Director
Finance and Corporate Resources
P Manning, Executive Director; T Little, Head of Communications and Strategy; P MacRae,
Administration Adviser; K McLeod, Administration Assistant; M M Wilson, Legal Services Manager
Housing and Technical Resources
S Gibson, Executive Director
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care; I Beattie, Head of Health and Social Care 
Also Attending:
Police Scotland
Chief Superintendent S Dolan and Superintendent A Thomson 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 1 March 2023 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.  
2
5

Page 6

3 Revenue Budget Monitoring for Period 12 - 1 April 2022 to 24 February 2023 and
Probable Outturn 
A report dated 15 March 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April 2022 to 24 February 2023, and the projection for
the year to 31 March 2023. 
The report:- 
 summarised the previously reported probable outturn position for the Council’s General
Fund Revenue Account to 31 March 2023
 provided details on the probable outturn position for the Housing Revenue Account to 31
March 2023
 provided details of the position of the General Fund Revenue Account and the Housing
Revenue Account respectively to 24 February 2023 
At its meeting on 1 February 2023, in respect of the General Fund Revenue Account, the
Committee agreed proposed transfers to reserves and the use of the £4.696 million underspend
to assist in the 2023/2024 Budget Strategy.  The forecast position before and after transfers to
reserves was detailed in appendices 1 and 2 to the report respectively.  The position detailed in
Appendix 2 included the underspend of £4.696 million as a transfer to reserves, resulting in a
breakeven position for the 2022/2023 probable outturn. 
At 24 February 2023, the position on the General Fund Revenue Account, after transfers to
reserves, was an underspend of £1.875 million.  This included an underspend of £0.165 million
on the delegated budget for Adults and Older People. 
At 24 February 2023, the Housing Revenue Account showed a breakeven position and the
forecast to 31 March 2023 on the Housing Revenue Account was also a breakeven position. 
Officers responded to members’ questions on various aspects of the report and, where information
was not immediately available, undertook to provide this to the relevant members. 
The Committee decided: 
(1) that it be noted that the Council’s outturn position was breakeven after transfers to reserves,
as detailed in section 4.2 of the report; 
(2) that the underspend position of £1.875 million on the General Fund Revenue Account at 24
February 2023 after transfers to reserves, as detailed in section 5.1 of the report, and
including an underspend of £0.165 million on the delegated budget to the Integration Joint
Board (IJB), as detailed in section 5.2 of the report, be noted; and 
(3) that the breakeven position on the Housing Revenue Account at 24 February 2023 and the
forecast of breakeven to 31 March 2023, as detailed at sections 6.1 and 6.2 of the report,
be noted. 
[Reference:  Minutes of 1 March 2023 (Paragraph 3)] 
4 Capital Programme 2022/2023 Update and Monitoring for Period 12 – 1 April 2022
to 24 February 2023 
A report dated 8 March 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on progress of the General Fund Capital Programme and the Housing Capital
Programme for the period 1 April 2022 to 24 February 2023.  
6

Page 7

At its meeting on 1 March 2023, the Committee had agreed a General Fund Capital Programme
for 2022/2023 amounting to £78.396 million.  The total programme of £78.396 million included
new proposed adjustments to the programme, as shown in Appendix 1 to the report.  The
adjustments amounted to £0.180 million and included additional funding for new projects.  Due to
timing of project spend, it was anticipated that this funding would slip into 2023/2024 and there
would be no impact on the 2022/2023 Capital Programme.  The total programme was detailed in
Appendix 2 to the report.  Budget for the period amounted to £46.008 million and, at 24 February
2023, £45.607 million had been spent on the General Fund Capital Programme, an underspend
of £0.401 million. 
Actual funding received to 24 February 2023 totalled £70.470 million.  The programme spend and
funding for the General Fund for the period was detailed in Appendix 3 to the report. 
Estimates from Resources suggested an outturn of around £73 million, a net underspend across
Resources of £5.3 million against the revised budget of £78.396 million.  The majority of the
variance was due to the timing of spend, resulting in budget required in 2023/2024 rather than
2022/2023.  A list of the main projects making up the predicted £5.3 million underspend, and which
would now complete in 2023/2024, was included in Appendix 4 to the report. 
At its meeting on 24 August 2022, the Committee had agreed a revised Housing Capital
Programme for 2022/2023 amounting to £66.361 million.  Programmed funding for the year also
amounted to £66.361 million.  The funding sources were detailed in Appendix 5 to the report.   
Revised estimates from Housing and Technical Resources suggested that there would now be an
underspend of £8.039 million within the Housing Capital Programme by the end of the financial
year, an increase of £3.9 million on the underspend reported in the previous period.  This was due
to a number of factors which were detailed in the report. 
In respect of both the General Fund Capital Programme and the Housing Capital Programme,
work to monitor achievable spend would continue and funding for projects remaining underspent
at the financial year end would be carried forward to allow the projects to be completed in
2023/2024. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the Period 12 position, ending 24 February 2023, of the General Fund Capital
Programme, detailed at appendices 1 to 4 of the report, and the Housing Capital
Programme, detailed at Appendix 5 of the report, be noted; 
(2) that the adjustments to the General Fund Programme, detailed at section 4.2 and Appendix
1 of the report, be approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference:  Minutes of 1 March 2023 (Paragraph 4)] 
5 Additional Funding from Scottish Government and Other External Sources 
A report dated 8 March 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on additional revenue funding, totalling £6.159 million, which had been made available
to the Council by the Scottish Government and other external sources.  
7

Page 8

The funding had been allocated as follows:- 
Revenue Funding 
Resource 2022/2023 
(£m) 
Finance and Corporate 0.155 
Education  2.146 
Total 2.301 
2023/2024 
(£m) 
Finance and Corporate 3.858 
Total 3.858 
Overall Total 6.159 
The Committee decided: that the report be noted. 
[Reference: Minutes of 1 March 2023 (Paragraph 5)] 
6 Police Scotland Local Police Plan 2023 to 2026 
A report dated 15 March 2023 by the Executive Director (Housing and Technical Resources) was
submitted on Lanarkshire Local Police Plan 2023 to 2026. 
In terms of the Police and Fire Reform (Scotland) Act 2012, the local Divisional Commander was
required to prepare a Local Police Plan setting out the strategic priorities and objectives for
policing in a local authority area.  The Lanarkshire Local Police Plan 2023 to 2026 covered both
North and South Lanarkshire local authority areas and explained how Lanarkshire Police Division
would deliver on local priorities over the next 3 years and how the Plan was linked to Police
Scotland’s strategic aims and outcomes. 
Details were given on the following 3 local policing priorities, identified through consultation, as
follows:- 
 protecting our communities
 safeguarding our citizens
 enhancing our service 
Focusing on the local policing priorities, Lanarkshire Police Division aimed to deliver on the
following 5 strategic outcomes:- 
 threats to public safety and wellbeing were resolved by a proactive and responsive police
service
 the needs of local communities were addressed through effective service delivery
 the public, communities and partners were engaged, involved and had confidence in policing
 people were supported through a positive working environment, enabling them to serve the
public
 Police Scotland was sustainable, adaptable and prepared for future challenges 
Chief Superintendent Dolan gave an overview of the changing environment in which Police
Scotland operated, following which Superintendent Thomson gave a presentation on the Plan. 
There followed a full discussion during which the officers from Police Scotland responded to
members’ questions on a range of issues. 
8

Page 9

The Chair, on behalf of members, thanked Chief Superintendent Dolan and Superintendent
Thomson for their interesting and informative presentation. 
The Committee decided: 
(1) that report be noted; and 
(2) that the Lanarkshire Local Police Plan 2023 to 2026, as detailed in Appendix 1 of the report,
be approved. 
[Reference:  Minutes of 13 May 2020 (Paragraph 12)] 
In terms of Standing Order No 14, the Chair adjourned the meeting at 11.11am for a 10 minute period. 
The meeting reconvened at 11.21am 
7 Community Alert Alarm Service 
A report dated 8 March 2023 by the Director, Health and Social Care was submitted outlining the
position presented to the South Lanarkshire Integration Joint Board (IJB) in respect of the level of
subsidy and weekly charge for the Community Alert Alarm Service (CAAS) as part of its statutory
obligation to set a balanced budget for 2023/2024. 
The South Lanarkshire IJB met on 28 March 2023 to set a balanced budget for 2023/2024, in
accordance with its statutory responsibilities.  In doing so, the IJB had to address a projected
recurrent funding gap of £8.9 million across delegated social care (Adult and Older People
Services) in 2023/2024.  Specifically, the IJB had to consider reducing the subsidy for the CAAS
in 2023/2024, while noting that the responsibility for deciding on levels of charging for social care
was a responsibility of the local authority in terms of the Public Bodies (Joint Working) (Scotland)
Act 2014.   
Details were given on:- 
 the service, which was currently available on request and for which there was no
assessment and review function or eligibility criteria in terms of access
 the cost of and demand for the service
 increase in the cost of the service as a result of the necessity to move from the current
analogue to a digital system
 the Council’s current level of subsidy to CAAS 
 options considered in relation to the subsidy rate for the CAAS
 the benchmarked position with other comparable local authorities 
Officers advised that, at the meeting of the IJB held on 28 March 2023, it had been decided that
the Executive Committee be requested to agree a reduction to the CAAS subsidy rate from 89%
to 74%, resulting in an increase in the weekly charge for the service from £1.70 to £4.10.  This
would result in additional income of £0.700 million which would contribute to addressing the social
care funding gap of £8.9 million.  If this additional income was not recoverable in full or part in
2023/2024 for the CAAS, the IJB would require to identify an alternative funding option to ensure
financial balance in 2023/2024. 
There followed a full discussion during which officers responded to members’ questions on various
aspects of the report and provided clarification on relevant matters.  
9

Page 10

Councillor Walker, seconded by Councillor Convery, proposed approval of the following additional
recommendations in respect of the report:- 
 that the intense budget and service pressures on local government and its health and social
care partners be noted
 that an increase in the weekly charge for the Community Alarm Alert Service (CAAS) to
£2.20 be approved
 that the Committee ask the Integration Joint Board to consider redesigning the CAAS to
moderate future charge increases and provide a more efficient service 
The Committee decided: 
(1) that the recurrent and substantial pressure on adult and older people social care budgets be
noted; 
(2) that the information provided in respect of the current level of subsidy and charging for the
CAAS, including the full costs of delivery of the service, the increasing costs of delivering
the service and the benchmarked position with other comparable local authorities be noted; 
(3) that the intense budget and service pressures on local government and its health and social
care partners be noted; 
(4) that an increase in the weekly charge for the CAAS from £1.70 to £2.20 be approved; and 
(5) that the Integration Joint Board be asked to consider redesigning the CAAS to moderate
future charge increases and provide a more efficient service. 
[Reference: Minutes of the South Lanarkshire Integration Joint Board of 28 March 2023
(Paragraph 5)] 
8 Urgent Business 
There were no items of urgent business. 
10

Page 11

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Additional Funding from Scottish Government and
Other External Sources 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (29 March 2023)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the additional funding totalling £2.798 million, detailed in Appendices 1 and
2, be noted. 
3. Background
3.1. The Council is periodically advised of additional funding which is made available from
the Scottish Government and other sources to enable various initiatives to be
undertaken. 
3.2. Additional funding may either be paid through the General Revenue Grant mechanism
or by the completion of appropriate grant claims. 
3.3. Details of the additional funding are attached in Appendices 1 and 2 of the report. The
report details additional funding that has been reported by Resources as part of the
additional resources notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £2.146 million has been identified for 2022/2023.   This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £0.652 million has been identified for 2023/2024 following
the Local Government Finance Order (received 2 March 2023).  This is detailed in
Appendix 2.   
3
11

Page 12

5.3. The total additional funding is, therefore, £2.798 million and Resource budgets will be
updated to reflect this additional funding, as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
7.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning 
Executive Director (Finance and Corporate Resources) 
26 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 29 March 2023 
List of Background Papers
 Additional Funding Reports 8 March 2023 to 26 April 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
12

Page 13

Appendix 1 
Additional Revenue Funding 
Resource  Description  2022/2023
£m 
2023/2024
£m 
Total
£m 
Method
Education
Resources 
Contribution to Teachers’ Pay
Award (2022/2023)
2.146 - 2.146 Scottish
Government 
TOTAL REVENUE FUNDING 2.146 - 2.146 
13

Page 14

Appendix 2 
Additional Capital Funding 
Resource  Description  2022/2023
£m 
2023/2024
£m 
Total
£m 
Method
Community and
Enterprise
Resources 
Cycling, Walking and Safer Routes - 0.652 0.652 Scottish
Government 
TOTAL CAPITAL FUNDING - 0.652 0.652 
14

Page 15

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Glasgow City Region City Deal – A72 Lanark Road/M74
Junction 7 Signalisation - Full Business Case 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 set out the Full Business Case (FBC) for the A72 Lanark Road / M74 Junction 7
Signalisation element of the Larkhall Community Growth Area City Deal project
 advise Committee on the next steps in progressing the project 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the A72 Lanark Road / M74 Junction 7 Signalisation Full Business Case
be approved;
(2) that grant funding be sought in accordance with the City Deal Grant Distribution
Process outlined in the Assurance Framework in relation to the delivery of the
project with the precise arrangements to be agreed by the City Deal Chief
Executive’s Group (CEG) and City Deal Cabinet.
[1r
3. Background
3.1. The Council is one of eight local authorities who, with the UK and Scottish
Governments, are signatories to the £1.13 billion Glasgow City Region City Deal.  
3.2. The City Deal is made up of a list of 20 key infrastructure projects that are intended
to collectively drive economic and inclusive growth across the Glasgow City Region
area. 
3.3. Community Growth Areas (CGAs) comprise one of four South Lanarkshire projects.
Larkhall Community Growth Area is one of the four CGAs with the others being
located in Newton, Hamilton and East Kilbride. 
3.4.  The Larkhall CGA comprises a number of individual education and transport
infrastructure projects which will be delivered over a timeframe of up to 10 years
which will in turn ‘create’ capacity to accommodate the increase in population from
housebuilding of up to 1750 residential units. The A72 Lanark Road / M74 Junction 7
Signalisation is the second of these projects to be brought forward to Full Business
Case stage at Larkhall CGA, the previous project being Glengowan Primary School
Extension which was completed in July 2022. 
3.5.  Governance arrangements for the City Deal initiative are defined within the
associated Assurance Framework. This sets out requirements for the development
4
15

Page 16

of Business Cases for individual projects. The first level of business case was the
Strategic Business Case which was approved by the Executive Committee on 26
August 2015 and the second level business case, the Larkhall CGA Outline
Business Case, was approved by the Executive Committee on 08 February 2017. 
3.6.  Full Business Cases for each project require to be formally approved via:- 
 the City Region Member Authority Committee process 
 the City Region Director of Regional Economic Growth has delegated powers to
approve this FBC.  The City Deal Chief Executive’s Group will consider this
FBC on 8 June 2023, following the delegated authority approval process and
subject  to this Committee approval  
4.  Current Proposal 
4.1.  A FBC has now been produced for the A72 Lanark Road / M74 Junction 7
Signalisation element of the Larkhall CGA project. As a result of impacts generated
by the new homes being built on the site, several improvements require to be
implemented to address the increase in traffic movements in the local road network. 
This FBC covers two road junction improvements where the on / off slip road ramps
from Junction 7, M74 meet the A72 Lanark Road. 
4.2 The physical outputs from the project are:- 
 2 new traffic light-controlled junctions at the M74/A72 on and off ramp slip roads
 2,300 sq. m of new carriageway created or improved via widening works /
resurfacing works
 Improved LED street lighting installed (40 columns)
 10,000 sq,m of existing carriageway improved
 2 new / improved vehicle restraint systems along the length of the M74/A72
overbridge parapets – total 210 lin. metres 
4.3 This FBC continues to make the case for the City Deal funding for Larkhall CGA
project in terms of:- 
 Strategic Fit 
 Commercial Case 
 Economic Case 
 Financial Case 
 Management Case 
The Executive Summary of the FBC is contained in Appendix 1 
4.4 The production of the FBC is the final City Deal approval milestone for this element
of the Larkhall CGA project and provides details of the delivery and construction of
the road junction woks. 
4.5 The project cost is £1.98 million comprising £1.703 million City Deal funding (86%
share) and £0.277 million SLC funding (14% share). 
4.6 The approval of this FBC will release funds to meet all these costs.  The construction
contract is expected to commence on site at the end of July 2023. 
5. Employee Implications 
5.1. There are no direct employee implications from this project as existing resources
within Enterprise and Sustainability Services and Roads, Transportation and Fleet
16

Page 17

Services are currently tasked with the management and delivery of this City Deal
project. 
6.  Financial Implications 
6.1.  The project budget for the A72 Lanark Road / M74 Junction 7 Signalisation project is
£1.98 million. Project costs incorporate all construction related costs and community
benefit monitoring.  
6.2.  The City Deal funding element of the total project cost is 86% of the project cost
(£1.703 million) with the Council contributing the 14% balance (£0.277million). 
6.3 The revenue implications associated with this project have been included in the
Council’s Revenue Budget Strategy for 2023/2024.  
7. Climate Change, Sustainability and Environmental Implications
7.1.  Sustainability – The statutory processes associated with the approval of the Larkhall
CGA have considered the following sustainability agenda items and are subject to
monitoring and review as detailed proposals for each phase of the development
progress:- 
 consider active travel and sustainable transport links
 encourage the use of sustainable and recycled materials in construction
 support habitat connectivity
 consider the lifecycle of the development
 support sustainable water resource management
 support sustainable waste management
 encourage energy efficiency through the orientation and design of buildings
 choice of materials and the use of low and zero carbon generating technologies 
8. Other Implications 
8.1.  Risk - The City Deal Cabinet has a Risk Management Strategy applied across all
City Deal projects. The purpose of this Risk Management Strategy is to provide a
systematic and effective method by which risks can be consistently managed. It
adopts a best practice approach, describes the specific risk management techniques
and standards to be applied and the responsibilities for achieving effective risk
management. 
8.2.  The Council is required to apply this City Deal Risk Management Strategy across
each of its City Deal projects to ensure consistency across all City Deal projects.
This will be a key tool in mitigating project risks and thereby limiting financial risk
associated with the Council’s 14% share of City Deal project costs. A robust
monitoring system has also been put in place to ensure that ‘early warnings’ are
provided and appropriate action taken. 
9.  Equality Impact Arrangements and Consultation Arrangements
9.1.  This report does not introduce a new policy, function or strategy or recommend a
significant change to an existing policy, function or strategy, and, therefore, no
impact assessment is required. Consultation has taken place with relevant
Resources within the Council and the CGA developers. In addition, consultation was
undertaken with the wider community through the CGA planning process. 
17

Page 18

David Booth
Executive Director (Community and Enterprise Resources) 
27 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Promote economic growth and tackle disadvantage
 Improve the availability, quality and access of housing
 Improve the road network, influence improvements in public transport and encourage
active travel 
 Work with communities and partners 
Previous References 
 Executive Committee, 26 August 2015 – City Deal – South Lanarkshire Council,
 Community Growth Areas, Strategic Business Case, 
 Executive Committee, 08 February 2017 – City Deal – South Lanarkshire Council
 Community Growth Areas, Larkhall Community Growth Area, Outline Business Case
 Executive Committee, 23 June 2021 – City Deal – Larkhall Community Growth Area,
Glengowan Primary School Extension - Full Business Case 
List of Background Papers 
 City Deal, Larkhall Community Growth Area – A72 Lanark Road / M74 Junction 7
Signalisation, Full Business Case (FBC2) 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Ken Meek, Project Manager 
Ext: 5928 (Tel: 01698 455928) 
E-mail: ken.meek@southlanarkshire.gov.uk
18

Page 19

Appendix 1 - A72 Lanark Road/M74 Junction 7 Signalisation Full Business Case 
Executive Summary
i. This Full Business Case 2 (FBC2) is for £1.98m City Deal funding – £1.703m City Deal (86%) and
£0.277m SLC (14%) – to enable signalisation of the M74 / A72 Lanark Road junctions at the Larkhall
Community Growth Area (CGA), accounting for Element 2 of the Larkhall CGA project proposal.  This
FBC continues to build the case from the Strategic Business Case (SBC) which secured approval for
£60.3m across South Lanarkshire’s four CGAs and from the Outline Business Case (OBC) which
secured approval for £20.15m City Deal funding to develop the Larkhall CGA project, comprising off-site
education, community and transport infrastructure.
The Strategic Case
ii. As presented in the OBC, there is a need for investment in offsite road infrastructure (and education/
community facilities) to allow the development of up to 1,750 new homes at Larkhall CGA. This project is
directly related to the creation of the initial development of 1,000 homes on the current CGA site that has
commenced construction with 310 houses built to date.
iii. The strategic aim of the M74 / A72 Lanark Road Junction Signalisation project element is:
“To deliver the off-site road infrastructure in a manner that enables delivery of the residential
development 10 years earlier than planned with associated economic and social benefits.”
iv. The planned outputs from the M74 / A72 Lanark Road Junction Signalisation project are:
- 2 new traffic light-controlled junctions at the M74/A72 on and off ramp sliproads
- 2,300 sq. m of new carriageway created or improved via widening works / resurfacing works.
- Improved LED street lighting installed (40 columns)
- 10,000 sq,m of existing carriageway improved.
- 2 new / improved vehicle restraint systems along the length of the M74/A72 overbridge parapets –
total 210 linear metres. 
SLC will have ongoing responsibility for the management and maintenance of the improved junction, as
defined in the financial appraisal, the revenue operating costs have been estimated and are
acknowledged by SLC.
v. In advance of the CGA development receiving planning consent it was necessary to carry out a transport
assessment to consider the implications of developing up to 1,750 new homes at Larkhall CGA.  This
included a review of the existing road network capacity, the additional traffic generation created and
increased use of public transport by up to 4,829 new residents.
vi. As reported in the OBC (and evidenced in the development profiles at Appendix 9), the counterfactual
arrangement is that the CGA development will be less attractive to purchasers and it will take until 2042
to complete only 1,000 homes as opposed to 1,750 houses by 2032 with preferred intervention.
The Economic Case
vii. The economic case presents and tests a series of alternative options – including the counterfactual or ‘do
nothing’ options, before a preferred solution that meets the identified needs and delivers Value for Money
for the public sector.
viii. The only viable options at FBC stage for M74 / A72 Lanark Road Junction Signalisation were around the
design and timing of the project proposal.  Through analysis of need and physical solutions, the delivery
of off-site road network enhancements at this key junction on the M74 / A72 Lanark Road Junction was
identified as the best option to achieve the project objectives.
The Commercial Case
19

Page 20

ix. Delivery of additional capacity in the road network is identified as a critical requirement in delivering the
full CGA over 10 years by meeting the needs of the key partners – new and existing local residents (by
releasing capacity), SLC and City Deal partners (by delivering additional economic value) and
housebuilders/ house purchasers (by creating a more attractive development proposition).
x. City Deal funding has been identified as the only viable source for delivery of the critical off-site enabling
infrastructure works for Larkhall CGA (schools/ roads/community) needed to bring forward the
development earlier than planned.  The commercial arrangement for delivery of FBC2 is via appointment
of a contractor, through a competitive tender.
xi. This FBC2 is scheduled to be delivered on site during the spring / summer of 2023 to minimise disruption
on the Larkhall road network and ensure continued progress by developers in delivering the CGA project
to the desired timescales.  It follows on from the completion of the extension works contained in FBC1 at
Glengowan Primary School.
The Financial Case
xii. The estimated total City Deal cost of the Larkhall CGA project, submitted at OBC, was £21.50m (split
86% CD / 14% SLC) with potential additional leveraged investment of £12.85m from SLC, £17.5m from
Developers’ S75 obligations, and £193m housebuilding and associated on-site infrastructure costs
(Discounted).  Phasing of the full CGA project expenditure is presented in Appendix 3.
xiii. Following a competitively tendered procurement exercise, the cost of delivering the M74 / A72 Lanark
Road Junction Signalisation project is estimated at £1.98m, accounting for 10% of the total approved
Larkhall CGA City Deal allocation.  The project works will commence on site in July 2023 – following
approval of £21.5m City Deal funding at OBC stage, SLC has committed to carrying the financial risk of
any project cost overrun beyond the City Deal funding request for this project i.e. £1.98 m of City Deal
funds.
xiv. SLC will take on the additional maintenance responsibilities at the new signalised junction, upgraded
carriageway etc. in perpetuity, following completion of the works.  These costs will be funded from
existing Council revenue and capital budgets, as the need arises.
xv. SLC has ultimate responsibility for cost over-runs beyond the level of financial budget/ approval for the
CGAs – an allowance of 25% was made for Optimism Bias within the cost profile for the whole CGA
investment programme.  The contract for this FBC2 has been awarded on a fixed price basis and
Optimism Bias for this element has therefore been reduced to zero.  Any VAT applicable has been
treated as recoverable.
The Management Case
xvi. The management and delivery of M74 / A72 Lanark Road Junction Signalisation project will be contained
within the remit of SLC’s CGA Programme.  Larkhall CGA will be managed by SLC in accordance with
the standards required by the City Deal governing principles.  Project roles have been assigned to Senior
Responsible Officer, Project Sponsor, Project Manager and an internal Project Team.  SLC Planning &
Economic Development will lead the delivery of the project with SLC Roads & Transportation Services
providing statutory services back-up.   This joint approach ensures alignment against other SLC CGA
and Roads projects across the transport network.
xvii. SLC Enterprise & Sustainable Development Services will have responsibility for the long-term monitoring
and evaluation of the project benefits, including community benefits, in line with the Monitoring &
Evaluation Plan, using in-house resource and supplemented by external specialist consultants as
required.  The economic impact model developed to appraise the gross and net benefits of the alternative
options, allows for the activities to be measured and performance tracked against the forecast profile.
xviii. The key objectives and critical success factors (as defined in the Strategic Case) have ensured that the
development of the Larkhall CGA is embedded in a holistic approach to sustainability – environmental,
economic, social and community – and the financial appraisal confirms that the project is financially
sustainable, recognising the need for future (planned) investment by the private sector to deliver the new
houses.
20

Page 21

xix. In summary the City Deal Larkhall investment generates the following results as per the OBC with this
project (FBC2) contributing 10% of the results: 
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Education Resources)  
Subject: Update on Proposal to Conduct a Consultation to
Realign the Catchment Areas of Glengowan Primary,
Machanhill Primary and Robert Smillie Primary
Schools, Larkhall 
1. Purpose of Report 
1.1 The purpose of the report is to:- 
 update the Executive Committee on the projections for Glengowan, Machanhill
and Robert Smillie Primary Schools and the current catchment area of the three
schools
 to seek approval from Executive Committee to conduct a statutory consultation,
previously approved by the Executive Committee on 25 March 2020 (delegated
decision taken by the Chief Executive, in consultation with Group Leaders), to:- 
change the catchment areas of Glengowan Primary School, Machanhill Primary
School and Robert Smillie Primary School to balance pupil numbers more
effectively and better align new housing developments in Larkhall to the school
geographically closer 
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):- 
(1) that a statutory consultation be conducted to change the catchment areas of
Glengowan Primary School, Machanhill Primary School and Robert Smillie
Primary School to balance pupil numbers more effectively and better align new
housing developments in Larkhall to the school geographically closer. 
3. Background
3.1 The proposal to conduct a statutory consultation to alter the catchment areas of
Glengowan Primary School, Machanhill Primary School and Robert Smillie Primary
School was put to the Executive Committee of 25 March 2020. 
3.2 This proposal was originally approved on 25 March 2020 by the Chief Executive in
consultation with group leaders as the full Executive Committee was unable to meet
due to the onset of the pandemic. 
3.3 As a result of the national lockdown in March 2020, the legislative inability to undertake
a public meeting, as required under the consultation process, and the redirection of
5
23

Page 24

resources to support sustained efforts throughout the Covid pandemic, the
consultation did not take place. 
3.4 Due to the time elapsed since the approval was given in March 2020 it is felt that the
Executive Committee should be updated as to the current position of the school rolls
and projected rolls and the developments in the area to allow the proposal to be
considered again. 
3.5 The current catchment areas for Glengowan Primary School, Machanhill Primary
School and Robert Smillie Primary School in Larkhall are shown on Appendix 1. This
is a historic boundary arrangement that, due to changes in the housing and population
distribution within the area over time, should be redrawn to link housing areas more
appropriately to each non-denominational primary school and more equitably balance
the pupil population where possible to do so. 
3.6 Appendix 1 also shows the two main housing development areas within Larkhall that
are currently within Machanhill Primary School’s catchment area but are
geographically closer to Glengowan Primary School and Robert Smillie Primary
School. 
3.7 Pupil data information for each of the affected schools is outlined in sections 3.8, 3.9
and 3.10. 
3.8 Robert Smillie Primary School
 Robert Smillie Primary School has 8 classrooms and a physical capacity of 264
(assuming an average of 33 pupils per class)
 the roll is 204 (September 2022 census)
 trends based on the average of the last three years’ P1 intake figures suggest
that the mainstream roll could be 201 in August 2025 
3.9 Machanhill Primary School 
 Machanhill Primary School has 12 classrooms and a physical capacity of 396
pupils (assuming an average of 33 pupils per class)
 the pupil roll is 329 (September 2022 census)
 trends based on the average of the previous three years’ P1 intake figures
suggest the mainstream roll could reach 348 in August 2025 
3.10 Glengowan Primary School 
 Glengowan Primary School currently has 17 classrooms and a physical capacity
of 561 pupils (assuming 33 pupils per classroom).  Current General-Purpose
areas have been designed to allow for further expansion in the future to increase
the capacity further to 594
 the pupil roll is 274 (September 2022 census)
 trends based on the average of the previous three years’ P1 intake figures
suggest the roll could reach 293 in August 2025   
4. Proposal - Catchment Realignment of Glengowan, Machanhill and Robert
Smillie Primary Schools
4.1 Catchment realignment – from Machanhill Primary School to Glengowan Primary
School  
24

Page 25

4.2 The proposal is for the Larkhall CGA development to be rezoned from Machanhill
Primary School to Glengowan Primary School. This area is shown in Appendix 1. 
School Current roll
(September
2022 census)
Number of
additional pupils
projected from
the CGA
development
Projected
future roll
Physical
Capacity
Glengowan
Primary
274 314 588 594
Machanhill
Primary
329 - 348 396 
As outlined above, on completion, the CGA development is projected to generate a
further 314 non-denominational children in addition to the pupils already living on the
CGA development site and already enrolled in school. Glengowan Primary School, as
well as being the nearest school to this development, has had a 2-classroom extension
completed in August 2022 to accommodate the additional pupils expected to be
generated from the site. Appendices 2 and 3 show the proposed change to the
catchment areas of Glengowan Primary School and Machanhill Primary School which
would re-align the new housing development to Glengowan Primary School. 
Within the school session 2019/2020, 64% of pupils from the Community Growth Area
(CGA) development currently zoned to Machanhill Primary School chose to attend
Glengowan Primary School via a placing request.  In session 2020/21 the number was
58%, and in session 2022/2023, 61% of pupils from the CGA attend Glengowan
Primary School via a placing request.  
4.3 Catchment realignment - Machanhill Primary School to Robert Smillie Primary School 
4.4 It is proposed that the section of the Larkhall Academy site, outlined on Appendix 2
and Appendix 4, and phase 2 of the Clare Crescent development, both of which lie
directly behind Robert Smillie Primary School, be realigned from Machanhill Primary
School to Robert Smillie Primary School.  This area is accessible to Robert Smillie
Primary School by a footpath from the development 
School Current roll
(September
2022 census)
Number of
additional pupils
projected from
the former
Larkhall
Academy
development
Projected
future roll
Physical
Capacity
Robert Smillie
Primary
204 56 260 264
Machanhill
Primary
329 - 348 396 
4.5 As outlined above, the area proposed to be rezoned is projected to generate an
additional 56 non-denominational pupils of primary age. It is proposed that the Phase
1 Clare Crescent development houses remain within the catchment area of Machanhill
Primary School. 
25

Page 26

4.6 Given the physical capacity of both Glengowan Primary School and Robert Smillie
Primary School and the assumptions of expected pupil numbers coming from the new
housing developments, it is anticipated that the realignment will allow for both
Glengowan Primary School and Robert Smillie Primary School to accommodate the
predicted numbers of pupils generated from the new housing developments. 
4.7 It is not anticipated that any adaptations will be required to accommodate the pupils,
however, should the need arise, any resultant adaptation or extensions would be
funded via developer contributions. 
5. Employee Implications
5.1 Employee resources would continue to be provided by means of existing staffing
protocols when calculating class teacher requirements and agreed management
structures. 
6. Financial Implications
6.1 The proposal demonstrates a Best Value approach to effectively managing the primary
school estate and the Council’s property portfolio. 
7. Climate Change, Sustainability and Environmental Implications
7.1 The proposal could allow for an increase in opportunities for walking and cycling to
school and may result in a reduction in the use of cars at the school locations. 
8. Other Implications
8.1 If approved, the implementation date of any catchment realignment would be for P1
enrolment in January 2024 for session 2024/2025. 
8.2 Families with children already attending either school, and with a further sibling
enrolling in P1 in respect of school sessions August 2024 through to August 2029, will
have the choice for their P1 child to be granted placement in that school regardless of
any catchment change. 
8.3 Given that the affected schools within the proposal are already zoned to Larkhall
Academy, there would be no effect on secondary pupil numbers as a result of the
proposal being implemented. 
8.4 As part of the statutory consultation process, a Public Meeting will be held to fully
engage with the local community on this proposal. 
9. Equality Impact Assessment and Consultation Arrangements
9.1 There was no requirement to carry out an Equality Impact Assessment in terms of this
report. 
9.2 Under the Schools (Consultation) (Scotland) Act 2010, any proposals to vary any of
the admission arrangements for a school, including its catchment area, would
necessitate a statutory consultation. 
Tony McDaid
Executive Director (Education Resources) 
28 April 2023  
26

Page 27

Link(s) to Council Values/Priorities/Outcomes
♦ Accountable, effective, efficient and transparent 
Previous References
 25 March 2020 Executive Committee meeting papers 
List of Background Papers
 Link to 25 March 2020 Executive Committee meeting papers 
https://southlanarkshire.cmis.uk.com/southlanarkshire/Meetingscalendar/tabid/70/ctl/
ViewMeetingPublic/mid/397/Meeting/1130/Committee/33/Default.aspx 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Lynn Sherry, Head of Education (Support Services and School Estate)
Ext:  5620 (Tel: 01698 455620)
E-mail:  Lynn.Sherry@southlanarkshire.gov.uk 
27

Page 28

28

Page 29

Appendix 1 – Existing Larkhall non-denominational catchment areas and Housing development areas
proposed to be realigned
Craigbank
Robert Smillie
Hareleeshill
Machanhill
Glengowan
29

Page 30

Appendix 2 – Proposed new catchment areas for Glengowan, Robert Smillie and Machanhill Primary Schools
Robert
Smillie
Proposed
addition to
Robert
Smillie
Machanhill
Glengowan
Proposed
addition to
Glengowan
30

Page 31

Appendix 3 – Detail of zone proposed to be rezoned from Machanhill Primary to Glengowan Primary
Existing Glengowan
Catchment
Proposed area for rezoning
from Machanhill PS to
Glengowan PS catchment
Proposed Machanhill
Catchment boundary
31

Page 32

Appendix 4 – Detail of zone proposed to be rezoned from Machanhill Primary to Robert Smillie Primary 
Glengowan
catchment
Proposed Machanhill
catchment boundary
Existing Robert
Smillie catchment
Proposed area for rezoning from
Machanhill PS to Robert Smillie
PS catchment (Larkhall
Academy site)
32

Page 33

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Outcome of the Review of the Safer South Lanarkshire
Board 
1. Purpose of Report
1.1. The purpose of the report is to: - 
 update Executive Committee on the outcome of the review of the Safer South
Lanarkshire Board completed during 2022/2023
 seek approval from Executive Committee for the revised terms of reference for
the Safer South Lanarkshire Board to be implemented 
2. Recommendation(s)
2.1 Executive Committee is asked to approve the following recommendation(s): - 
(1) that the contents of this report be noted; and
(2) that the revised terms of reference for the Safer South Lanarkshire Board be
approved and implemented from 18 May 2023.   
3. Background
3.1. The Safer South Lanarkshire Board (the Board) was established in 2013 by the
Council’s Executive Committee to ensure the Council and Community Safety
Partnership (CSP) met new statutory requirements arising from the recently introduced
Police and Fire Reform (Scotland) Act 2012.   
3.2. Administered by the Council on behalf of the CSP, the Board aims to facilitate and
enhance cooperation between community safety partners who operate in South
Lanarkshire. It has no independent legal status, operating within the wider Community
Planning Partnership.   
3.3. Following a review of the South Lanarkshire Community Plan in 2022 and the
subsequent launch of the new Community Plan 2022 - 2032, the CSP was advised
that the previous reporting requirements directly from the Board to the Community
Planning Partnership Board (CPPB) were no longer necessary. As such, the CPPB
requested that the CSP undertake a review of the Board which aimed to ensure the
role and remit remained appropriate and beneficial for partners within the CSP. 
6
33

Page 34

4. Structure of Review 
4.1. Facilitated by South Lanarkshire Council’s Housing and Technical Resources, the
review has been completed throughout 2022/2023, aligning with the initial time
commitment provided to the CPPB. 
4.2. The review focussed only on the role and remit of the Board and involved the following
aspects: 
 existing remit and structure of the Board presented to new Board members
 research into other local authority area structures regarding scrutiny and
performance reporting of police, fire and anti-social behaviour services
 discussions with Board members and wider community safety partners to
understand their preferred priorities and focus for the Board
 discussions with wider community planning partners to understand how the
functions of the CSP interact with wider partnership remits and structures 
4.3. Updates on the progress of the review have been delivered to the Board at its meetings
on 12 September 2022 and 12 December 2022, with members noting the progress
made and agreeing the timescale for completion. 
5.  Outcomes of the Review
5.1. Following completion of the review and removal of the requirement for reporting
community safety measures directly to the CPPB, it is proposed the Board reverts to
focusing on three of its original key functions. These are:- 
1. Conducting regular review and scrutiny of police performance against priorities
set within the Lanarkshire Local Police Plan. 
2. Conducting regular review and scrutiny of fire performance against priorities set
within the Local Fire Plan. 
3. Monitoring progress within the statutory South Lanarkshire Anti-social Behaviour
Strategy and associated partnership activity. 
5.2. Each of these functions formed part of the original remit of the Board when established
in 2013 and will enable it and its members to fulfil statutory obligations from the Police
and Fire Reform (Scotland) Act 2012 in delivering effective scrutiny of police and fire
services operating in South Lanarkshire.   
5.3. Police and Council statutory obligations through the Anti-social Behaviour etc.
(Scotland) Act 2004 also require strong governance arrangements to ensure partners
are delivering against agreed targets and priorities and supported by the partnership
Anti-social Behaviour Strategy Implementation Group (ASBIG), the review identified
that the established structure of the Board continues to be the most effective method
of achieving this.   
5.4. In addition, agreement was given from discussions with Board members that the CSP
Budget should continue to be considered by the Board separately as part of individual
partner budgets on an annual basis. As such, the Board, supported by the Safer South
Lanarkshire Steering Group (SSLSG), will continue its role as approver for the
allocation of the annual budget, and continue to receive an annual evaluation report
on how the funds have been spent by partners and impact made.  
34

Page 35

5.5. The review also considered other aspects of the Board’s current remit that had been
gradually expanded since 2013. It identified that many of these were already being
progressed through different partnership arrangements already in place, and the wider
remit impacted the Board’s ability to deliver on its original functions. 
5.6. Details for each of these other aspects, and the proposed outcome for each following
the review, is summarised below. A key part of this process was to confirm with
relevant lead partners that there would be no negative consequences caused as a
result of removing these areas from the Board’s remit:- 
 Following discussion with and agreement from representatives of the Community
Justice Partnership, regular reporting requirements currently delivered to the
Board will no longer be maintained. These instead will be aligned through the
Public Protection Chief Officers Group (PPCOG), allowing the required direct
reporting to the CPPB to continue. Representatives from the Community Justice
Partnership will, however, continue to be members of the Board to provide
updates on key developments or activity and with the aim of ensuring alignment
between the Community Safety Partnership and Community Justice Partnership 
 Following discussions with and agreement from Police Scotland, confirmation
has been given that they are already leading partnership activity to tackle issues
associated with each of the drugs and road traffic priorities through the South
Lanarkshire Alcohol and Drug Partnership (ADP) and the Lanarkshire Road
Safety Forum 
 In addition, work to tackle issues associated with the existing domestic abuse
priority is also being progressed within the South Lanarkshire Gender Based
Violence Partnership, with partners agreeing its removal as a CSP priority would
reduce duplication that has occurred between the two partnership structures 
 The Scottish Fire and Rescue Service is currently undertaking its own review of
the Unintentional Injuries Group, ensuring membership, remit and priorities within
continue to be appropriate following changes to personnel within the service. The
outcomes of this will initially be presented to the SSLSG with consideration to be
given as to how it can continue linking with the CSP. Further updates will also be
provided to the Board as appropriate through the Local Fire Plan updates 
5.7. Taking account of the outcomes of the review, the revised terms of reference for the
Board have been detailed at Appendix 1. 
5.8. The Board endorsed the proposed changes to the terms of reference on 13 March
2023 and an update on the outcomes of the review was also provided to the
Community Planning Partnership Board on 22 March 2023.   
6. Next Steps
6.1. Following approval be Executive Committee, the terms of reference for the Board will
be notified and terms of reference updated from 18 May 2023.   
6.2. Discussions will be held with members of the Board to help identify any development
or training needs to assist in delivery of the proposed revised remit, including the
enhanced scrutiny functions of both police and fire services in South Lanarkshire. 
35

Page 36

7. Employee Implications
7.1. There are no employee implications associated with the report. 
8. Financial Implications 
8.1. There are no financial implications associated with the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Other Implications
10.1. There are no implications for risk in terms of the information contained within this
report. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. The Community Safety Partnership is committed to ensuring that equalities issues are
mainstreamed and will act in a manner that is consistent with legislation.   
Stephen Gibson
Executive Director (Housing and Technical Resources) 
26 April 2023 
Previous References
 22 May 2013, Executive Committee
 12 September 2022, Safer South Lanarkshire Board
 12 December 2022, Safer South Lanarkshire Board
 13 March 2023, Safer South Lanarkshire Board
 22 March 2023, Community Planning Partnership Board 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Jonathan Read
Strategy and Policy Advisor
E-mail: Jonathan.read@southlanarkshire.gov.uk 
36

Page 37

Appendix 1
Proposed revised Terms of Reference 
Title Safer South Lanarkshire Board
Membership South Lanarkshire Council
• Elected Members (5)
• Housing and Technical Resources
• Community and Enterprise Resources
• Education Resources
• South Lanarkshire Health and Social Care Partnership
Police Scotland
Scottish Fire and Rescue Service
NHS Lanarkshire 
Victim Support Scotland
South Lanarkshire Community Health Partnership / ADP
South Lanarkshire Community Justice Partnership
Crown Office and Procurator Fiscal Service
Chair South Lanarkshire Council will appoint a Chair from the five elected
members appointed to the Safer South Lanarkshire Board. 
The Chair will be able to nominate another Safer South Lanarkshire
Board member as a substitute Chair from the other members when they
are not able to attend. 
The role of the Chair is to ensure that the agenda business is properly
dealt with and clear decisions are reached. There is a responsibility to
ensure that the views and opinions of all participants at the meeting are
allowed to be expressed and that they contribute to the outcomes of the
meeting. 
Remit The remit of the Board is to: 
1. Conduct regular review and scrutiny of police performance
against priorities set within the Lanarkshire Local Police Plan 
2. Conduct regular review and scrutiny of fire performance against
priorities set within the Local Fire Plan
3. Consider the priorities and objectives for policing and fire
services within South Lanarkshire and ensure these are aligned
with wider local and national priorities and targets. 
4. Monitor progress within the South Lanarkshire Anti-social
Behaviour Strategy and other statutory functions of both the
council and the police relating to anti-social behaviour.  
5. Maintain an overview of and ensure appropriate allocation and
evaluation of the Community Safety Partnership Budget, as
agreed annually. 
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Land and Property Disposals 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Executive Committee of the actions required in respect of land and
property transactions
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the land and property as detailed in Appendix A declared surplus to Council
requirements. 
3. Background
3.1. Details of land and property, which are potentially suitable for disposal or
redevelopment are circulated to all Resources and Community Partners to establish if
they are suitable for alternative operational use. 
3.2. Transactions where there is a requirement to declare land surplus to enable
negotiations for minor or adjoining sales to progress are detailed on Appendix A. 
3.3. These transactions are only included in the report after successful consultation with
the Holding Resource(s) and Planning. 
4. Minor Disposals
4.1. The schedule shown within Appendix A identifies proposed transactions where the
holding Resource and Planning have agreed to the release of minor areas of land for
disposal. 
4.2. The Committee is asked to approve the recommendation that these areas of land are
declared surplus to the Council requirements in order that the Estates Section can
conclude negotiations for their disposal. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. The minor disposals will generate capital receipts for the Housing Revenue Account
and General Services account respectively.  
7
39

Page 40

7. Climate Change, Sustainability and Environmental Implications
7.1. This report does not introduce a new policy, function or strategy which impacts on the
natural environment, climate change or sustainability. 
8. Other Implications
8.1. There is a low risk that the capital receipts anticipated, as a result of declaring
properties surplus, may not be realised if, for reasons outwith the Council’s control,
the purchasers choose not to proceed with the transactions.  However, the procedures
and consultations described in Sections 3 of this report have been implemented to
minimise this risk. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2 Consultation was undertaken with Planning, Roads, Community, and Housing
Services. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
20 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Achieve results through leadership, good governance and organisational effectiveness 
Previous References
 None 
List of Background Papers
 Plans of the land and property referred to in this report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext:  4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk  
40

Page 41

APPENDIX A 
DECLARE SURPLUS 
Area Description Holding Account Proposal Value
Banding
62 sq m 62 Watson Street,
Larkhall
Housing Garden Ground 4
115 sq
m
47 Millheugh Place,
Blantyre
Housing Garden Ground 4
52 sq m 26 Morland, East
Kilbride
Community and
Enterprise Resources 
Garden Ground 4
195 sq
m
20 Broompark Road,
Blantyre
Community and
Enterprise Resources
Garden Ground 4
113 sq
m
3 Myers Crescent,
Uddingston
Housing Garden
Ground/driveway
4
1.8 sq
m
Swan Way, Law Community and
Enterprise Resources
Residential Gas
Regulator
4
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
41

Page 42

42

Page 43

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Chief Executive  
Subject: Representation on Outside Bodies 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request a change in membership of the Safer South Lanarkshire Board
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the change in membership of the Safer South Lanarkshire Board, as
detailed at paragraph 4.1, be approved. 
3. Background
3.1. The Council, at its meeting on 18 May 2022, approved its representation on certain
statutory joint boards and outside bodies.  A report, which provided an update on
arrangements that were delegated to the Chief Executive to finalise, was submitted
to the Council on 15 June 2022.  A further report to consider representation on a
number of other bodies was submitted to the Executive Committee on 29 June 2022
at which time, in respect of the remaining vacancies, delegated authority was given
to the Chief Executive, in consultation with the Leaders of the relevant Groups, to
confirm nominations.   
4. Amendment to Representation on the Safer South Lanarkshire Board
4.1. On 2 May 2023, a request was received from the Business Manager of the SNP
Group that Councillor Gray be replaced by Councillor Cowan as a member on the
Safer South Lanarkshire Board.   
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1 None. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change or environmental implications as a result of this report. 
8. Other Implications
8.1. There are no issues in terms of risk arising from this report. 
8
43

Page 44

9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, therefore, no impact assessment is
required.   
9.2. Appropriate consultation has been undertaken in terms of the information contained
in this report. 
Cleland Sneddon
Chief Executive 
2 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council 18 May and 15 June 2022
 Executive Committee 29 June 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Susan Somerville, Administration Manager
Ext: 4197 (Tel:  01698 454197)
E-mail:susan.somerville@southlanarkshire.gov.uk 
44

Page 45

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Education Resources)
Executive Director (Finance and Corporate Resources)  
Subject: External Representation on the Education Resources
Committee - Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on the appointment of representatives other than
councillors to serve on the Education Resources Committee
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the appointment of Naomi Baxter and the reappointment of Christine Hall
as Parent Council representatives on the Education Resources Committee be
confirmed.
[1recs]
3. Background
3.1. At its meeting on 29 June 2022, the Committee agreed that the election and
selection procedures to obtain specified categories of religious and parent/carer
representation on the Education Resources Committee be approved.   
4 Update on Appointment of 2 Parent Council Representatives
4.1 All Parent Councils were invited to submit nominations to serve on the Education
Resources Committee by 31 October 2022. 
4.2 Each Parent Council could nominate 1 member provided that the nomination was
proposed at a formal meeting of the Parent Council. 
4.3 Each nominee was invited to provide a statement of support. 
4.4 At the close of nominations, 4 applications had been received for the 2 available
places.  Subsequently, 1 applicant withdrew their application.  Following an interview
with each of the applicants conducted by the Education Resources Operations
Manager (with responsibility for parental involvement and engagement) and the
Parental and Engagement Officer (CQIS) on 19 April 2023, it is proposed that the
appointment of the following Parent Council representatives on the Education
Resources Committee is confirmed:- 
 Naomi Baxter (Bankhead Primary School)
 Christine Hall (reappointment) (Chapelton Primary School) 
9
45

Page 46

5 Financial Implications
5.1 The appointment of representatives to serve on the Education Resources Committee
can be met from within existing resources. 
6 Climate Change, Sustainability and Environmental Implications 
6.1 There are no implications for the environment, climate change or sustainability in
terms of the information contained in this report 
7 Other Implications
7.1 There are no risk implications in terms of the information contained in this report. 
8 Equality Impact Assessment and Consultation Arrangements
8.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2 Information on the nomination process for Parent Council representation was issued 
to all Parent Councils. 
Tony McDaid
Executive Director (Education Resources) 
Paul Manning
Executive Director (Finance and Corporate Resources) 
25 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, transparent 
Previous references
 Executive Committee 1 February 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Pauline MacRae, Administration Adviser
Ext:  4108  (Tel:  01698 454108 or 07385 370044)
E-mail:  pauline.macrae @southlanarkshire.gov.uk 
46

Page 47

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Chief Executive 
Subject: Recommendations Referred by Resource Committees 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the following recommendations referred to this Committee by
the:- 
 Education Resources Committee of 2 May 2023
 Finance and Corporate Resources Committee of 3 May 2023 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the recommendations referred by the Education Resources Committee of
2 May 2023 in relation to the Review of Admissions Policy for Early Learning
and Childcare Establishments 2023 be approved; and 
(2) that the recommendation of the Finance and Corporate Resources Committee
of 3 May 2023 in relation to the Procurement Strategy 2023 to 2028 be
approved.
[1recs]
3. Recommendation Referred by Education Resources Committee of 2 May 2023
– Review of Admissions Policy for Early Learning and Childcare
Establishments 2023– Extract of Minute 
3.1. A report dated 6 April 2023 by the Executive Director (Education Resources) was
submitted on a review of the policy for the admission of children into Early Learning
and Childcare establishments in South Lanarkshire. 
Since 1996, the Council’s Admissions Policy for Early Years’ Establishments had
been regularly reviewed to reflect changes in legislation and national policy
development.   
The last review of the Admissions Policy had been presented to the Education
Resources Committee on 19 January 2021. 
The Children and Young People Act (Scotland) 2014 committed to delivering 1,140
hours of early learning and childcare per year to eligible children aged 2 to 5 years
from August 2020.  However, in March 2020, due to the COVID-19 pandemic, the
10
47

Page 48

Scottish Government revoked this legislation and the statutory duty was
subsequently reinstated in August 2021.  The Scottish Government had also advised
of a plan to introduce legislation to expand full implementation of revised deferral
eligibility in 2023. 
The Council approved ‘early access for 3 year olds’ in March 2019 and this had been
fully implemented since August 2019.  Across the Council area, children could
commence free early learning and childcare provision from the Monday following
their 3rd birthday. 
Early Learning and Childcare (ELC) Lead Locality Officers had responsibility for
direct contact on any admissions enquiries as part of a strategy to support effective
communications. 
In March 2023. a consultation exercise was undertaken with a range of stakeholders
on the current Admissions Policy. The main points which had emerged from the
consultation process were outlined in the report and the proposed revised Policy,
attached as Appendix 1 to the report, had taken account of a number of those points. 
If approved, the admissions policy would be used for the allocation of all early
learning and childcare places. 
Details were provided on:- 
 proposed priorities for allocation of additional hours
 options available in respect of delivering 1,140 hours of early learning and
childcare
 deferred entry to primary school   
In response to a member’s question on nursery provision, officers undertook to
investigate the matter further. 
The Committee recommended to the Executive Committee: 
(1) that the priorities for admission to all Early Learning and Childcare (ELC)
establishments, as detailed in Appendix 1 to the report, be approved; and 
(2) that the admissions policy and process for the allocation of places to all Early
Learning and Childcare Establishments be implemented from August 2023. 
[References:  Minutes of 19 January 2021 (Paragraph 7) and Minutes of the
Executive Committee of 10 February 2021 (Paragraph 9)] 
4. Recommendation Referred by Finance and Corporate Resources Committee of
3 May 2023 –Procurement Strategy 2023 to 2028– Extract of Minute 
A report dated 3 April 2023 by the Executive Director (Finance and Corporate
Resources) was submitted on the Procurement Strategy 2023 to 2028. 
The Procurement Reform Act (Scotland) required the Council to develop a Procurement
Strategy and undertake an annual review of strategic objectives.  The statutory guidance
detailed the areas that the strategy must include. 
The Council’s previous Procurement Strategy covered the period 2020 to 2023 and was
approved on 13 May 2020.
48

Page 49

The Procurement Strategy 2023 to 2028 was attached as Appendix 1 to the report.  The
Strategy communicated the Council’s vision for procurement based on the following 7 key
strategic objectives:- 
 compliance
 value for money
 collaborative
 contract and supplier management
 Fair Work First
 sustainable and ethical
 community wealth building 
The Strategy promoted continuous improvement in all procurement activities and
aimed to ensure that they were performed effectively while delivering efficiencies
where possible. 
In addition to detailing how the Council would maintain and improve upon its core
procurement capability, it also considered how the Council would meet its obligations
in term of the Sustainable Procurement Duty and Fair Work First and acknowledged
its wider responsibilities in respect of the Council’s Sustainable Development and
Climate Change Strategy and Community Wealth Building Strategy. 
An annual action plan would be developed each year for the life of the Strategy to
support the strategic objectives.  Regular updates on progress against both strategic
outcomes and the annual action plan would be reported to the Corporate
Management Team and this Committee.  The draft action plan for 2023/2024 was
detailed in Appendix 2 to the report. 
Officers responded to a member’s question on the report. 
The Committee
recommended to the
Executive Committee:
that the Procurement Strategy 2023 to 2028,
attached as Appendix 1 to the report, be
approved. 
[Reference: Note of Delegated Decisions taken by the Chief Executive, in
consultation with Group Leaders, on items of business relating to the Executive
Committee Agenda of 13 May 2020 (Paragraph 6)] 
5. Employee Implications
5.1. All employee implications were highlighted as part of the original reports to Resource
Committee. 
6. Financial Implications
6.1. All financial implications were highlighted as part of the original reports to Resource
Committee. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. Any risks or other implications were highlighted as part of the original reports to the
Resource Committee.
49

Page 50

9. Equality Impact Assessment and Consultation Arrangements
9.1. Equality impact assessment and consultation arrangements were highlighted as part
of the original reports to the Resource Committees. 
9.2. There is no requirement to carry out an Equality Impact Assessment or consultation
in terms of the proposals contained in this report. 
Cleland Sneddon
Chief Executive 
3 May 2023 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References 
♦ Education Resources Committee of 2 May 2023 (Paragraph 7)
♦ Finance and Corporate Resources Committee of 3 May 2023 (Paragraph 10) 
List of Background Papers
 Individual reports to Resource Committee
 ..\..\..\Education Resources\Education Resources Committee\230502\7 - Review of
Admissions Policy for Early Learning and Childcare Establishments 2023.docx
 ..\..\..\Finance and Corporate Resources\Finance and Corporate Resources
Committee\230503\10. Procurement Strategy 2023 to 2028.docx 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Pauline MacRae, Administration Adviser
Tel: 07385370044
E-mail:  Pauline.macrae@southlanarkshire.gov.uk
50

Page 51

P Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 17 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Leisure and Culture Strategy 2022-
2027 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the South Lanarkshire Leisure and Culture (SLLC) Strategy 2022-2027,
for noting
[1purpose]
2. Recommendations
2.1. The Executive Committee is asked to approve the following recommendations:-
[
(1) that the SLLC Strategy 2022-2027, attached at Appendix 1, be noted. 
3. Background
3.1. South Lanarkshire Leisure and Culture Limited (SLLC) assumed responsibility for the
operation, management and development of sports and leisure, community halls,
arts venues, country parks, libraries and museums on behalf of South Lanarkshire
Council. 
3.2.  A Cross Party Working Group (CPWG) review of leisure and culture provision was
undertaken during 2020/21 to clarify the terms of the relationship between the
Council, SLLC and its Board, and its role as a provider of services to the Council.
The outcomes from this review were approved at this Committee on 23 June 2021,
including new modernised governance arrangements which led to the conversion of
SLLC Ltd to a Scottish charitable incorporated organisation (“SCIO”) on 3 April 2023. 
3.3.  The SLLC Strategy 2022-27 was approved by the SLLC Board on 22 June 2022 and
is being presented to the Executive Committee for noting. The Strategy sets out how
the new SCIO will move forward over the next 5 years to make a renewed and
positive difference to people’s lives. 
4. Development of the Strategy
4.1. Development of the Strategy commenced late 2021, following the creation of new
Vision, Mission and Values for the organisation. A presentation was given to the
SLLC Board in February 2022, outlining the direction of travel for the Strategy and
the draft strategic themes which would be further developed and presented for
consultation. 
4.2. The draft strategic themes were presented to SLLC staff, partners and stakeholders
for input via survey and workshops. Council officers also worked closely with SLLC
throughout the development of the Strategy, and the Trust utilised evidence provided
11
51

Page 52

by the Council, including social, economic and health related data, to inform the
Strategy development. 
4.3. The Strategy sets out SLLC’s strategic objectives for the next five years, which are
based on the themes of:- 
 Health and Wellbeing
 Connected and Engaged
 Equality and Inclusion 
 Organisational Sustainability 
4.4. The three cross cutting themes within the Strategy align with the priorities and key
ambitions within the Council Plan, Connect (2022 – 2027) and the South Lanarkshire
Community Plan (2022 – 2032):- 
 Reduce inequality (People) 
 Recover, progress and improve (Progress)
 Work towards a sustainable future (Planet) 
4.5. The final draft Strategy was subject to full consultation with partners, staff and trade
union representatives, communities and Council services in May 2022, and approved
at the SLLC Board on 22 June 2022. 
5. Monitoring and Implementation of the Strategy 
5.1. Four strategic implementation groups have been established within SLLC to develop
key actions and new performance indicators for each of the four themes. The first full
year of monitoring and reporting performance against the new Strategy will begin in
May 2023, and an action to this effect will be included and reported as part of the
Community and Enterprise Resource Plan for 2023/2024. 
6.  Commissioning Plan 
6.1. In line with SLLC’s conversion to a SCIO, the Council will now take the opportunity to
develop a Commissioning Plan for SLLC, and this will be presented to the Executive
Committee for approval later this year.   
6.2.   The aim of the Commissioning Plan will be to define the Council’s ‘ask’ of SLLC over
the medium to long term, to help ensure that leisure and cultural services remain
accessible and sustainable whilst taking account of available and projected Council
funding. This will enable SLLC to best position itself to continue to improve the
health, wellbeing and learning of South Lanarkshire residents. 
6.3. The commissioning plan exercise will also review and update the existing suite of
documentation which defines the relationship between the Council and SLLC,
including Service Level Agreements and other related documentation. 
7. Employee Implications
7.1. There are no employee implications arising from this report. SLLC staff and trade
unions were consulted throughout the development of the Strategy. 
8. Financial Implications
8.1. Given the ongoing financial challenges faced by the Council and SLLC, it is
inevitable that leisure and cultural services will change over the period of time
covered by the Strategy. 
52

Page 53

9. Climate Change, Sustainability and Environmental Implications
9.1. There are no climate change or environmental implications as a result of this report.
‘Work towards a sustainable future’ is recognised as a key cross cutting theme within
the Strategy. 
10.  Other Implications
10.1. The SLLC Strategy 2022 – 2027 takes cognisance of key council policies and
strategies including the Council Plan (‘Connect’) and the strategic themes and focus
of the Community Plan (2022 – 2032). 
11. Equality Impact Assessment and Consultation Arrangements
11.1.  An Equality Impact Assessment has been completed for the Strategy. 
David Booth
Executive Director (Community and Enterprise Resources) 
28 April 2023 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Gillian Simpson, Development Adviser 
Email:  Gilian.Simpson@southlanarkshire.gov.uk
53

Page 54

54

Page 55


Strategy
South Lanarkshire
Leisure and Culture
55

Page 56

2 56

Page 57

3
Contents
Foreword 4
How we built this Strategy  6
What does SLLC do? 8
External impacts on SLLC  10
Our five-year Strategy  12
Objectives 14
How we will deliver the Strategy  18
Page
57

Page 58

4
Foreword
58

Page 59

559

Page 60

6
How we built this
Strategy
Our strategy has been designed to: 
• Target the things that matter to the people of South Lanarkshire 
• Be supported by the evidence we see in facts and figures 
• Be informed by good practice and in step with legislation and key policies
• Complement the extensive work of the SLC Council Plan and Community Plan
The five-year strategy for SLLC has been developed from:
• The information we have received from consultation and conversations 
with communities and key partners 
• Information from local and national facts and figures 
• National and local policy, established best practice, current legislation 
and guidance 
Best
Practice
Partners
Council Plan
and
Community
Plan
Community
6 60

Page 61

761

Page 62

What does 
SLLC do?
Established in 2010 as a Scottish Charity, SLLC delivers services on behalf of South Lanarkshire Council providing a
wide range of programmes and initiatives across the whole of South Lanarkshire which have a positive impact on
the health and wellbeing of local residents and beyond.
• £37.5m Annual Budget
• 1,600 Members of staff 
• 9 Swimming pools
• 12 Bowling greens
• 6 Golf courses
• 2 Country parks
• 120 Sports pitches
• 5 Cultural venues
• 2 Outdoor learning facilities
• 69 Halls
• 22 Indoor leisure facilities
• 23 Libraries
• 1 Museum
8 62

Page 63

9
Sport &
Physical Activity
Leisure
Parks &
Outdoors
Approximately 8.5 million customer visits to its
facilities and services including:
Attendances
3,000,000 2,000,000 1,000,000 0
1,968,286 visitors
1,423,507 visitors
2,252,589 visitors
2,838,728 visitors
Cultural Services
Libraries and Museums
Outdoor Recreation and Country Parks
Sport and Physical Activity
Libraries
Culture
Museums
Arts
963

Page 64

10
There are several key external factors which impact upon the work of SLLC and which require acknowledgment
due to their ability to influence how SLLC operates. These Political, Economic, Social, Technological, Legal and
Environmental factors include:
• Pandemic recovery 
• Electoral events 
• Cost of living impact on individuals
• Cost of utilities and financial challenges 
• Changes in demographic and ageing population
• Change in social trends and use of leisure time
• External funding environment
• Legislative and policy changes 
• Climate emergency and Net Zero 
• Mobile and digital technology 
• Commercial competition
External impacts
on SLLC
64

Page 65

1165

Page 66

12
Values
 Do the right thing  Even when no one’s looking.
 Be a great team Work together, share ideas, share mistakes,  
share successes.
 Own it Be accountable for outcomes good and bad.  
Don’t pass the buck.
 Be positive Be hospitable. Make people feel good.
Vision
Healthier, happier, more connected lives.
Mission
Improve health and wellbeing by offering attractive, affordable activities
delivered with warmth, friendliness and individual pride.
Our five-year Strategy
66

Page 67

13
Health and Wellbeing
Help the people of South Lanarkshire to live
healthier, happier lives with a focus on physical
and mental wellbeing
Objectives
Equality and Inclusion
Provide accessible wellbeing and learning
services through targeted interventions
Organisational Sustainability
Develop a business model that allows sustainable provision of
quality services in priority areas
Cross Cutting
Themes
  Reduce inequality
  Recover, progress 
and improve
  Work towards a   
sustainable future
Connected and Engaged
Enable people to connect with each other and with
their community through the services we provide
67

Page 68

14
We will:
Help the people of South Lanarkshire to live healthier, happier lives with a focus on physical and 
mental wellbeing
Steps we will take:
• Participate in a whole system approach to health and wellbeing along with our partners including 
the NHS, the Health and Social Care Partnership and others, to improve health and wellbeing for    
individuals and communities within South Lanarkshire
• Encourage and support the inactive to be active with focus on positive physical health and wellbeing 
outcomes
• Support positive mental health and deliver on health and wellbeing outcomes
• Provide early intervention and prevention initiatives to address health and wellbeing matters at their 
root cause
Objective:
Health and Wellbeing
68

Page 69

15
We will:
Enable people to connect with each other and with their community through the services we 
provide
Steps we will take:
• Reach out to people where they are, by providing services to all communities across South Lanarkshire
• Support communities to develop and build their capacity and, where appropriate, explore 
options for asset transfer of our resources 
• Develop alternative delivery methods and grow our digital offerings such as online classes and    
access to e-books
• Help tackle isolation by providing initiatives that bring people together
Objective:
Connected and Engaged
69

Page 70

16
We will:
Provide accessible wellbeing and learning services through targeted interventions
Steps we will take:
• Ensure equality of opportunity by making sure that our services are accessible to all 
• Target our programmes and interventions to ensure we reach those most in need of our services
• Enable access to learning and information across our communities and support community learning
• Provide welcoming inviting spaces where customers receive a warm reception
Objective:
Equality and Inclusion
70

Page 71

17
We will:
Develop a business model that allows sustainable provision of quality services in priority areas
Steps we will take:
• Develop a financially sustainable business model which optimises income and utilises diverse    
funding streams 
• Develop our people ensuring staff remain highly skilled and are supported to deliver the best standard 
of customer service
• Review our facilities to ensure we have financially sustainable spaces to enable quality service provision
• Reduce waste and energy usage and seek new ways to be more energy efficient across our services
Objective:
Organisational Sustainability
71

Page 72

18
We will deliver our strategy by:
Working in partnership – we will work with our partners and stakeholders both nationally and locally to ensure
that our strategy delivers for the people of South Lanarkshire. 
Aligning all of our resources – including finances, facilities and our people, to ensure successful delivery of the
strategy. 
Reviewing and evaluating – we will review progress and report our success in meeting our strategic objectives
to our Board, South Lanarkshire Council and our stakeholders.
Risks – we will continue to identify areas of risk by carrying out regular analysis of opportunities and threats.
How we will deliver
the strategy
72

Page 73

1973

Page 74

SLLC: 1867
If you need this information in a different format or language, please contact us to discuss 
how we can best meet your needs.
Telephone 01698 476262 
Text phone 18001 01698 476262 
or e-mail customer.services@southlanarkshireleisure.co.uk
74