Democracy Spraffa

Agenda Document Pack - Executive Committee - 29/03/2023

South Lanarkshire Council · 29 March 2023
Back to Executive Committee — 29 March 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 21 March 2023 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 29 March 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Mark Horsham, Gavin Keatt, Eileen Logan, Katy Loudon,
Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley McDonald, Mark
McGeever, Davie McLachlan, Richard Nelson, Mo Razzaq, Kirsten Robb, John Ross, David
Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Graeme Horne, Martin Hose, Susan
Kerr, Ross Lambie, Elaine McDougall, Norman Rae, Dr Ali Salamati, Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 1 March 2023
submitted for approval as a correct record.  (Copy attached) 
3 - 12 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 12 - 1 April 2022 to 24 February and
Probable Outturn
Report dated 15 March 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
13 - 18 
4 Capital Programme 2022/2023 Update and Monitoring for Period 12 – 1
April 2022 to 24 February 2023
Report dated 8 March 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
19 - 28 
5 Additional Funding from Scottish Government and Other External Sources
Report dated 8 March 2023 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
29 - 32 
Item(s) for Decision 
6 Police Scotland Local Police Plan 2023 to 2026
Report dated 15 March 2023 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
33 - 66 
7 Community Alert Alarm Service
Report dated 8 March 2023 by the Director, Health and Social Care.  (Copy
attached) 
67 - 72 
Urgent Business 
8 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
2

Page 3

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 1 March 2023 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Walter Brogan (substitute for Councillor
Eileen Logan), Councillor Robert Brown, Councillor Andy Carmichael, Councillor Ross Clark,
Councillor Gerry Convery (Depute), Councillor Margaret Cooper, Councillor Andrea Cowan,
Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller, Councillor Mark Horsham, Councillor
Ross Lambie (substitute for Councillor Richard Nelson), Councillor Katy Loudon, Councillor Hugh
Macdonald, Councillor Elaine McDougall (substitute for Councillor Maureen Chalmers), Councillor Ian
McAllan, Councillor Catherine McClymont, Councillor Kenny McCreary, Councillor Lesley McDonald,
Councillor Mark McGeever, Councillor Davie McLachlan, Councillor Mo Razzaq, Councillor Kirsten
Robb, Councillor John Ross, Councillor David Shearer, Councillor Margaret B Walker 
Councillors' Apologies:
Councillor Maureen Chalmers, Councillor Gavin Keatt, Councillor Eileen Logan, Councillor Richard
Nelson 
Attending:
Chief Executive’s Service
C Sneddon, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director
Education Resources
T McDaid, Executive Director
Finance and Corporate Resources
P Manning, Executive Director; T Little, Head of Communications and Strategy; P MacRae,
Administration Adviser; G McCann, Head of Administration and Legal Services; K McLeod,
Administration Assistant; K McVeigh, Head of Personnel Services
Housing and Technical Resources
S Gibson, Executive Director
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care; L Purdie, Head of Children and Justice Services and
Chief Social Work Officer 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 1 February 2023 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.  
2
3

Page 4

3 Revenue Budget Monitoring for Period 11 - 1 April 2022 to 27 January 2023 and
Probable Outturn 
A report dated 16 January 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on the overall financial position of the Council’s General Fund Revenue Account
and Housing Revenue Account for the period 1 April 2022 to 27 January 2023 and the projection
for the year to 31 March 2023. 
The report:- 
 summarised the previously reported probable outturn position for the Council’s General
Fund Revenue Account to 31 March 2023
 provided details on the probable outturn position for the Housing Revenue Account to 31
March 2023
 provided details of the position of the General Fund Revenue Account and the Housing
Revenue Account respectively to 27 January 2023 
At its meeting on 1 February 2023, in respect of the General Fund Revenue Account, the
Committee agreed proposed transfers to reserves and the use of the £4.696 million underspend
to assist in the 2023/2024 Budget Strategy.  The forecast position before and after transfer to
reserves was detailed in appendices 1 and 2 to the report respectively.  The position detailed in
Appendix 2 included the underspend of £4.696 million as a transfer to reserves, resulting in a
breakeven position for the 2022/2023 probable outturn. 
At 27 January 2023, the position on the General Fund Revenue Account, after transfers to
reserves, was an underspend of £0.355 million, which was in line with the forecast position. 
At 27 January 2023, the Housing Revenue Account showed a breakeven position and the forecast
to 31 March 2023 on the Housing Revenue Account was also a breakeven position. 
The Committee decided: 
(1) that it be noted that the Council’s outturn position was breakeven after transfers to reserves,
as detailed in section 4.2 of the report; 
(2) that the underspend position of £0.355 million on the General Fund Revenue Account at 27
January 2023, after transfers to reserves, as detailed in section 5.1 of the report, be noted;
and 
(3) that the breakeven position on the Housing Revenue Account at 27 January 2023, and the
forecast to 31 March 2023 of breakeven, as detailed at sections 6.1 and 6.2 of the report,
be noted. 
[Reference:  Minutes of 1 February 2023 (Paragraph 3)] 
4 Capital Programme 2022/2023 Update and Monitoring for Period 11 – 1 April 2022
to 27 January 2023 
A report dated 8 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on progress of the General Fund Capital Programme and the Housing Capital
Programme for the period 1 April 2022 to 27 January 2023.  
4

Page 5

At its meeting on 1 February 2023, the Committee had agreed a General Fund Capital Programme
for 2022/2023 amounting to £78.272 million.  A revised programme of £78.396 million was now
anticipated. This reflected proposed adjustments to the programme totalling a net increase of
£0.124 million, mainly as a result of additional funding for roads projects, as shown in Appendix 1
to the report.  Budget for the period amounted to £38.915 million and, at 27 January 2023, £39.540
million had been spent on the General Fund Capital Programme, an overspend of £0.625 million. 
Actual funding received to 27 January 2023 totalled £68.848 million.  The programme spend and
funding for the General Fund for the period was detailed in appendices 2 to 4 to the report. 
At its meeting on 24 August 2022, the Committee had agreed a revised Housing Capital
Programme for 2022/2023 amounting to £66.361 million.  Programmed funding for the year also
amounted to £66.361 million.  The funding sources were detailed in Appendix 5 to the report. 
Budget for the period amounted to £45.339 million and, at 27 January 2023, £43.015 million had
been spent on the Housing Capital Programme, an underspend of £2.324 million.  This was due
to a number of factors which were detailed in the report. 
In respect of both the General Fund Capital Programme and the Housing Capital Programme,
work to monitor achievable spend would continue and funding for projects remaining underspent
at the financial year end would be carried forward to allow the projects to be completed in
2023/2024. 
Officers responded to a member’s question on various aspects of the report. 
The Committee decided: 
(1) that the Period 11 position, as at 27 January 2023, of the General Fund Capital Programme,
as detailed in appendices 1 to 4 of the report, and the Housing Capital Programme, as
detailed in Appendix 5 of the report, be noted; 
(2) that the adjustments to the General Fund programme, as detailed in Sections 4.2 and
Appendix 1 of the report, be approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference:  Minutes of 1 February 2023 (Paragraph 4) and 24 August 2022 (Paragraph 4)] 
5 Additional Funding from Scottish Government and Other External Sources 
A report dated 9 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on additional revenue funding, totalling £1.537 million, which had been made
available to the Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2022/2023 
(£m) 
Finance and Corporate 1.537 
Total 1.537 
The Committee decided: that the report be noted. 
[Reference: Minutes of 1 February 2023 (Paragraph 5)]  
5

Page 6

6 Proposals to Extend, Upgrade and Modernise Our Lady of Lourdes Primary
School, East Kilbride 
A report dated 16 February 2023 by the Executive Director (Education Resources) was submitted
on proposals to extend, upgrade and modernise Our Lady of Lourdes Primary School, East
Kilbride. 
In January 2004, the Council entered a 20-year lease for the provision of a modular construction
building to be used as a school building for Our Lady of Lourdes Primary School and Nursery
Class.  The lease term was due to end on 30 January 2024.  At its meeting on 19 January 2021,
the Education Resources Committee approved the acquisition of the Our Lady of Lourdes
building.  The building had been acquired and formed part of the Council’s property portfolio. 
Following the acquisition, a feasibility study had been undertaken to provide solutions and costs
for the following:- 
 3 additional classrooms to accommodate pupil growth predicted from several housing
developments in the school catchment area
 a comprehensive internal and external upgrade of the existing building to include a new roof,
over cladding of the external walls, upgrading of the ventilation and heating systems, new
windows and doors and general works to bring the school up to the high specification of the
recently completed Primary Schools’ Modernisation Programme
 works to secure the playground with a dedicated entrance walkway and security fencing
around the perimeter of the school playground 
Due to the extent of the internal and external upgrading of the building, it was proposed to decant
Our Lady of Lourdes Primary School to the new Jackton Primary School building currently being
constructed as part of the East Kilbride Community Growth Area.  The new non-denominational
Primary School at Jackton was currently programmed to open to pupils in August 2023.  However,
in the first year of operation, the new building would have sufficient accommodation to house both
schools.  It would not be possible to decant the Our Lady of Lourdes Nursery Class to the new
school and it was proposed that those children be accommodated at the new Kilbryde Early
Learning and Child Care Centre. 
Subject to the successful completion of the new Jackton Primary School in summer 2023 and
approval of City Deal Funding, it was proposed that the decant of Our Lady of Lourdes Primary
School commence in August 2023 for 12 months, with pupils returning to the extended and
upgraded school building in August 2024. 
Details were given on proposed funding for the project’s estimated cost of £4.754 million which
were as follows:- 
 monies from the Glasgow Region City Deal - £1.0 million
 developer contributions from the local area - £3.354 million
 an element of the Scottish Government’s Free School Meals funding - £0.400 million 
A Change Control request would require to be submitted to the Glasgow City Region City Deal
Cabinet requesting that funding of £1.0 million be reallocated within the Council’s overall City Deal
Programme.   
Officers responded to members’ questions on various aspects of the report and, where information
was not immediately available, undertook to provide this to the relevant members. 
The Committee decided: 
(1) that the extension, upgrading and modernisation of Our Lady of Lourdes Primary School,
East Kilbride, as detailed in the report, be approved; and  
6

Page 7

(2) that approval be given to submit a Change Control request to the Glasgow City Region City
Deal Cabinet to provide part funding for the Our Lady of Lourdes Primary School project. 
[Reference: Minutes of the Education Resources Committee of 19 January 2021 (Paragraph 6)] 
Councillor Carmichael joined the meeting during consideration of this item of business 
7 Family Support Strategy and Whole Family Wellbeing Funding 
A joint report dated 28 December 2022 by the Director, Health and Social Care and the Executive
Directors (Education Resources) and (Finance and Corporate Resources) was submitted
providing an update on:- 
 the Family Support Strategy to deliver earlier, more preventative, strengths-based help and
support to families, preventing escalation to care and protection proceedings
 the proposed spend, as agreed by the Children’s Services Strategy Group, for the Whole
Family Wellbeing Funding of £1.827 million
 the proposed spend for the £0.8 million non-recurring funding for Children and Family
support as identified in budget setting for 2022/2023
 national and local drivers informing the Strategy, including the #KeepthePromise Plan 2021
to 2024, known as ‘The Plan’ and funding aligned to develop and enhance earlier help and
family support services 
The Promise Identified the need to significantly upscale Family Support Services and identified
whole family support as a priority in The Plan 2021 to 2024.  The Covid-19 Children and Families
Collective Leadership Group’s vision and blueprint set out a clear ambition that children and
families should be able to access preventative, needs based support when required, for as long
as it was required. 
The package to achieve this comprised funding from:- 
 Whole Family Wellbeing - £1.827 million 
 Council Change Fund - £0.8 million
 Health and Social Care Partnership (IJB) - £0.570 million
 Corra Foundation - £0.487 million 
Year 1 funding in respect of the Whole Family Wellbeing Funding was intended to be flexible to
support Children’s Services Partnerships to assess local gaps and opportunities and to plan
activity accordingly, with a view to laying the groundwork for scaling up transformational activity
in subsequent years. 
Details were given on the 6 spending criteria associated with the fund.  Funding was not to be
used to support business as usual but, instead, was to be an additional resource to support
transformation of the system.   
Proposals to support this transformation included:- 
 the creation of an Earlier Help Hub (EHH) 
 establishment of the Pathfinder Programme to promote effective early intervention and to
consider how best to promote resilience and support young people on the edges of care
 interface with the Third Sector 
7

Page 8

It was proposed that the following additional posts be approved. 
Whole Family Wellbeing Fund – posts to be added to Social Work and Education Resources’
establishments, as appropriate, on a permanent basis with the exception of the Service Manager
post which would be on a 12 months’ fixed term basis:- 
Post  Proposed 
Number of 
Posts 
(FTE)
Permanent
Grade SCP Range Annual Salary
Service Manager
1
12 month
fixed term
post
Grade 5 Level 8 107-108 £66,864 to £67,832
Team Leader 2 Grade 3 Level 8 79-80 £44,309 to £44,966
Social Workers 2 Grade 3 Level 4 72-74 £40,276 to £41,115
Pathfinder Officers 8 Grade 3 Level 2 63-65 £35,531 to £36,498
Parenting Support
Workers 8 Grade 2 Level 1 -
4 34-57 £24,180 to £32,629
Reflective Practice Co-
ordinator 1 Grade 3 Level 8 79-80 £44,309 to £44,966
Promise Development
Worker  2 Grade 2 Level 2 - 39-40 £25,822 to £26,151
Clerical Assistant 1 Grade 1 Level 4 30-31 £22,975 to £23,286 
Council Change Fund – posts to be added to the Social Work establishment for a fixed term of
23 months:- 
Post  Proposed 
Number of 
Posts 
(FTE)
Permanent
Grade SCP Range Annual Salary
Family Support
Workers  7 Grade 2 Level 1 -
4 34-57 £24,180 to £32,629 
Corra Funding – posts to be added to the Social Work establishment on a permanent basis:- 
Post  Proposed 
Number of 
Posts 
(FTE)
Permanent
Grade SCP Range Annual Salary
Peer Support Workers 3.5 Grade 1 Level 4 30-31 £22,975 to £23,286 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the report be noted; and 
(2) that the additional posts, as detailed above and at section 6 of the report, be approved.  
8

Page 9

8 Records Management Policy 
A report dated 13 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on a proposed revision of the Council’s Records Management Policy, together with
arrangements for communication of the Policy. 
The revised Records Management Policy, which was attached as an appendix to the report,
applied to all records created, received, held, used and managed by the Council, irrespective of
the format of the records, and to all permanent and temporary employees of the Council. 
Details were provided on:- 
 matters covered by the Policy 
 the benefits of good records management
 proposed changes to the Policy 
If approved, the revised Policy would be circulated to all employees by means of a Personnel
Circular and Management Bulletin and would also be made available for download from the
intranet.  Resources would also disseminate the revised Policy through Resource Management
Teams and team meetings. 
The Committee decided: 
(1) that the revised Records Management Policy, attached as an appendix to the report, be
approved; and 
(2) that the arrangements for communicating the revised Records Management Policy to
employees be noted. 
[Reference: Minutes of 11 May 2016 (Paragraph 12)] 
9 Retention and Disposal Policy 
A report dated 13 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on a proposed revision of the Council’s Retention and Disposal Policy, together
with arrangements for communication of the Policy. 
The revised Policy, which was attached as an appendix to the report, would assist the Council in
meeting its obligations under the Public Records (Scotland) Act 2011 and would enable
employees to make appropriate arrangements for the retention and disposal of the records under
their care. 
Details were provided on the areas covered by the Policy including:- 
 record retention arrangements
 retention periods
 record disposal 
The revised Policy would be circulated to all employees by means of a Personnel Circular and
Management Bulletin and would also be made available for download from the intranet. 
Resources would also disseminate the revised Policy through Resource Management Teams and
team meetings. 
The Committee decided: 
(1) that the updated Retention and Disposal Policy, attached as Appendix 1 to the report, be
approved; and 
9

Page 10

(2) that the arrangements for communication of the Policy, as detailed in section 4.4 of the
report, be noted. 
[Reference: Minutes of 23 September 2015 (Paragraph 14)] 
10 King Charles III - Coronation 
A report dated 3 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted advising of the arrangements to enable employees to celebrate the Coronation of
King Charles III. 
To mark the Coronation of King Charles III on Saturday 6 May 2023, an additional national bank
holiday had been announced for Monday 8 May 2023.  To accommodate the celebration of this
event, non-essential services provided by the Council would be reduced and Council offices
closed, where possible. 
Details were given on services which would be provided by the Council on 8 May 2023. 
Employees required to work on the additional fixed annual leave day would receive a day’s leave
which they could take at an alternative time. 
The Committee decided: 
(1) that the Council provide a reduced service on Monday 8 May 2023, as detailed in paragraph
4.1 of the report; and 
(2) that the addition of a fixed annual leave day for employees on Monday 8 May 2023 be noted. 
11 Coronation of King Charles III 
A report dated 16 February 2023 by the Chief Executive was submitted:- 
 providing details of potential opportunities for South Lanarkshire communities to engage in
events related to the Coronation of King Charles III
 detailing ways in which the Council could assist with such opportunities 
The Lord Lyon King of Arms had written to local authorities across the UK, including South
Lanarkshire Council, to give initial details of how communities across the country could become
involved in the event. 
Local authorities in Scotland were:- 
 advised that celebrations, such as the Coronation, were best when they were community
led, infused with local flavour and demonstrated the care and consideration of all involved 
 asked to promote the participation of local communities in the Coronation in their local areas
and help communities consider how they could participate and prepare for the Coronation 
Details of suggested ways in which to celebrate the Coronation were provided in the report. 
The Council would promote the invitation to local communities to participate in the Coronation
through:- 
 the usual communications channels, such as the South Lanarkshire View and social media  
10

Page 11

 the Community Engagement Team which would make community groups aware of potential
routes for funding such as the National Lottery Community Fund and the Council’s
community grants
 offering free lets for community groups specifically marking the Coronation at the key venues
of Rutherglen Town Hall, Lanark Memorial Hall, Hamilton Town House and East Kilbride
Civic Centre
 assisting community groups to prepare for specific events within the regular duties
undertaken by the Council, for example, by considering requests for road closures to permit
street parties and other events to take place 
Following discussion, Councillor Fagan, seconded by Councillor Convery, moved approval of the
recommendations contained in the report.  Councillor Allison, seconded by Councillor McCreary,
moved as an amendment that, in addition to approval of the recommendations contained in the
report, a third recommendation be approved to the effect that officers, in consultation with the
Group Leaders, look at a cost effective way of commemorating the Coronation of King Charles lll. 
On a vote being taken using the electronic voting system, 8 members voted for the amendment
and 20 for the motion which was declared carried. 
The Committee decided: 
(1) that the arrangements around the Coronation and opportunities for local communities and
organisations to participate be noted; and 
(2) that free lets be offered to community groups for the specific purpose of participation in
Coronation events, with South Lanarkshire Leisure and Culture reimbursed for lost income,
as detailed at section 5.2.3. of the report. 
12 Recommendations Referred by Finance and Corporate Resources Committee 
A report dated 15 February 2023 by the Chief Executive was submitted on recommendations
referred to this Committee by the Finance and Corporate Resources Committee at its meeting
held on 15 February 2023. 
The recommendations of the Finance and Corporate Resources Committee were as follows:- 
 that the devolution of Non-Domestic Rates Empty Property Relief (EPR) to councils and the
funding arrangements be noted
 that the EPR Policy be reviewed and presented to the Finance and Corporate Resources
Committee by March 2024 to allow for a period of stability for rate payers and the Council
 that the EPR Policy, to be adopted by South Lanarkshire Council from 1 April 2023, be
endorsed and referred to the Executive Committee for approval 
The Committee decided: that, in terms of the recommendation referred by the Finance
and Corporate Resources Committee, the Empty Property
Relief (EPR) Policy be approved and adopted by the Council
from 1 April 2023. 
[Reference: Minutes of the meeting of the Finance and Corporate Resources Committee of 15
February 2023 (Paragraph 10)]  
11

Page 12

13 South Lanarkshire Integration Joint Board Annual Performance Report 2021/2022 
A report dated 20 January 2023 by the Director, Health and Social Care was submitted presenting
the South Lanarkshire Integration Joint Board’s (IJB) Annual Performance Report (APR)
2021/2022. 
The Public Bodies (Joint Working) (Scotland) Act 2014 placed a duty on IJBs to prepare and
publish APRs. 
The APR aimed to ensure that performance was open and accountable, whilst providing an overall
assessment of performance in relation to planning and carrying out integration functions. 
Guidance issued by the Scottish Government had recommended that the following areas be
included within the report:- 
 a summary of progress against the 9 National Health outcomes using, as a minimum, the
23 core national performance indicators
 financial performance and Best Value 
As with previous years, the APR was aligned to reporting progress against the intentions outlined
in the Strategic Commissioning Plan (SCP) and, for this APR, would cover the final year of the
2019 to 2022 SCP. 
The Scottish Government had advised that IJBs could delay the release of their APR using the
mechanisms laid out in the Coronavirus (Scotland) Act 2020. 
The IJB’s External Auditor, Audit Scotland, was required to supply an audit certificate outlining the
findings of the audit process undertaken in relation to the IJB’s Annual Accounts 2021/2022.  The
External Auditor had concluded that the financial statements of the South Lanarkshire IJB for
2021/2022 gave a true and fair view of the state of affairs and of its net expenditure for the year
and, therefore, had issued an unqualified independent Auditor’s Report.  This assurance was
reflected within the APR 2021/2022.  Details of the External Auditor’s key messages were
provided in the report. 
The Committee decided: that the report be noted. 
14 Representation on Recruitment Committee 
A report dated 9 February 2023 by the Chief Executive was submitted on action taken, in terms
of Standing Order No 37(c), because of the timescales involved, by the Executive Director
(Finance and Corporate Resources), in consultation with the Chair and an ex officio member, to
approve a change in membership of the Recruitment Committee. 
The Committee decided: that the following action taken, in terms of Standing Order
No 37(c), by the Executive Director (Finance and Corporate
Resources), in consultation with the Chair and an ex officio
member, be noted:-   
 Councillor Macdonald replaced by Councillor Cowan
as a substitute member of the Recruitment Committee 
15 Urgent Business 
There were no items of urgent business. 
12

Page 13

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 29 March 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 12 - 1 April 2022
to 24 February and Probable Outturn 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise Members of the overall financial position of the Council’s General Fund
Revenue Account and Housing Revenue Account for the period 1 April 2022 to 24
February 2023, and the projection for the year to 31 March 2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that it be noted that the Council’s outturn position is breakeven after transfers
to reserves (section 4.2);
(2) that the underspend position of £1.875 million on the General Fund Revenue
Account as at 24 February 2023, after transfers to reserves (section 5.1) and
including an underspend of £0.165 million on the delegated budget to the
Integration Joint Board (IJB) (section 5.2), be noted; and
(3) that the breakeven position on the Housing Revenue Account at 24 February
2023 and the forecast to 31 March 2022 of breakeven (sections 6.1 and 6.2),
be noted. 
3. Background
3.1. This overview report will summarise the previously reported Probable Outturn position
for the Council’s General Fund Revenue Account to 31 March 2023 (section 4). 
Sections 5 and 6 provide the position on the General Fund Account and the Housing
Revenue Account for the current period 1 April 2022 to 24 February 2023 respectively.   
4. 2022/2023 General Services Probable Outturn 
4.1. As reported previously, the 2022/2023 probable outturn position for the General
Services presented an underspend of £4.696 million.  This underspend was after
previously approved transfers of £17.420 million earmarked for the Budget Strategy,
and new proposed transfers to reserves totalling £17.195 million.  It was also proposed
that outturn underspend of £4.696 million be transferred to reserves to assist in the
2023/2024 Budget Strategy. 
4.2. The Executive Committee (1 February 2023) approved the new proposed transfers to
reserves and the use of the £4.696 million Probable Outturn underspend to assist in
the 2023/2024 Budget Strategy.  Full details of the transfers to reserves were included
in the same report.  The forecast position before and after transfers to reserves is
shown in appendices 1 and 2 respectively.  The breakeven position presented in
Appendix 2 includes the Probable Outturn underspend of £4.696 million as a transfer
to reserves. 
3
13

Page 14

5. 2022/2023 General Services Monitoring Position  
5.1. Financial Position as at 24 February 2023 
As at 24 February 2023, the position on the General Services budget, after transfers
to reserves, is an underspend of £1.875 million (Appendix 2). 
5.2. It is noted that the Period 12 position for Social Work Resources is breakeven. 
However, this includes an underspend on the delegated budget for Adults and Older
People (£0.165 million) which is offset by a net overspend in the other Non-Delegated
Services.  If the underspend on the delegated budget is removed from the core Council
position, then the revised core Council position as at Period 12 is an underspend of
£1.710 million.   
6. Housing Revenue Account Position
6.1. Financial Position as at 24 February 2023   
Appendix 3 of the report shows a breakeven position against the phased budget on
the Housing Revenue Account. This takes account of an element of the underspend
in Financing Charges, as forecast as part of the Probable Outturn exercise.  Levels of
rent collection continue to be monitored by the Housing Services team and appropriate
corrective action will be taken, as required.   
6.2. Probable Outturn Position:  Appendix 3 also shows the forecast position for the
financial year, being a breakeven position for the Housing Revenue Account.   
7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. As detailed in sections 4 to 6 of the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Other Implications
10.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  Inflationary and budget pressures experienced this year increase the risk
of overspend, however, this is mitigated going forward through provision of additional
funds in next year’s budget strategy, and through the one-off use of reserves in the
current year.   
10.2. The actual impact will continue to be reviewed through 4 weekly Budget Monitoring
Meetings at which any variance is analysed. In addition, the probable outturn exercise
position in this report ensures early warning for corrective action to be taken where
appropriate. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
11.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
14

Page 15

Paul Manning
Executive Director (Finance and Corporate Resources) 
15 March 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 1 March 2023 
List of Background Papers
 Financial Ledger and budget monitoring results to 24 February 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
15

Page 16

Appendix 1 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (BEFORE Transfers) 
Period Ended 24 February 2023 (No.12) 
Committee 
Annual
Budget 
Annual
Forecast
BEFORE
Transfers  
Annual
Forecast
Variance
BEFORE
Transfers
(Over) /
Under 
Budget
Proportion
to 24/02/23 
Actual 
to 
Period 10
24/02/23 
Variance 
to
24/02/23 
Departments: £m £m £m  £m  £m  £m 
Community and Enterprise Resources 129.813 128.536 1.277  111.496  110.348  1.148 under
Facilities, Waste and Grounds 75.641 73.884 1.757  64.400  62.795  1.605 under
Leisure and Culture Services 23.942 23.930 0.012  21.493  21.479  0.014 under
Planning and Regulatory Services 5.138 4.096 1.042  4.530  3.609  0.921 under
Enterprise and Sustainable Development 6.958 6.844 0.114  6.108  5.967  0.141 under
Roads, Transportation and Fleet 18.134 19.782 (1.648)  14.965  16.498  (1.533) over
Education Resources 397.586 396.086 1.500  340.677  339.293  1.384 under
Education 397.586 396.086 1.500  340.677  339.293  1.384 under
Finance and Corporate Resources 48.242 48.242 0.000  50.024  50.024  0.000 -
Finance Services - Strategy 2.129 2.141 (0.012)  3.116  3.026  0.090 under
Finance Services - Transactions 23.789 23.295 0.494  21.232  20.799  0.433 under
Audit and Compliance Services 0.376 0.376 0.000  0.569  0.578  (0.009) over
Information Technology Services 5.304 5.340 (0.036)  7.678  7.741  (0.063) over
Communications and Strategy Services 3.353 3.504 (0.151)  2.888  2.980  (0.092) over
Administration and Licensing Services 4.274 4.747 (0.473)  4.359  4.725  (0.366) over
Personnel Services 9.017 8.839 0.178  10.182  10.175  0.007 under
Housing and Technical Resources 19.145 19.487 (0.342)  19.397  19.627  (0.230) over
Housing Services 9.830 9.830 0.000  8.432  8.432  0.000 -
Property Services 9.315 9.657 (0.342)  10.965  11.195  (0.230) over
Social Work Resources 216.286 210.651 5.635  189.194  184.676  4.518 under
Performance and Support Services 7.084 6.405 0.679  6.432  5.653  0.779 under
Children and Families 42.988 44.144 (1.156)  38.573  39.974  (1.401) over
Adults and Older People 165.086 159.451 5.635  143.107  138.424  4.683 under
Justice and Substance Misuse 1.128 0.651 0.477  1.082  0.625  0.457 under
Joint Boards 2.152 2.152 0.000  1.928  1.928  0.000 -               
813.224 805.154 8.070  712.716  705.896  6.820 under           
Committee 
Annual
Budget 
Annual
Forecast
BEFORE
Transfers  
Annual
Forecast
Variance
BEFORE
Transfers
(Over) /
Under 
Budget
Proportion
To 24/02/23 
Actual 
to 
Period 10
24/02/23 
Variance 
to
24/02/23 
£m £m £m  £m  £m  £m 
Service Departments Total 813.224 805.154 8.070  712.716  705.896  6.820 under
CFCR 0.514 0.514 0.000  0.000  0.000  0.000 -
Loan Charges 35.041 30.306 4.735  0.000  0.000  0.000 -
Corporate Items 28.729 24.157 4.572  17.266  15.996  1.270 under
Corporate Items – Strategy (Tfr to Reserves) 17.420 0.000 17.420  0.000  0.000  0.000 -
Investments – 2022/23 (Tfr to Reserves) 0.000 0.000 0.000  0.000  0.000  0.000 - 
0.000 0.000 0.000       
Total Expenditure 894.928 860.131 34.797  729.982  721.892  8.090 under                         
Council Tax 167.437 170.688 3.251   143.517  146.304  2.787 over rec
Less: Council Tax Reduction Scheme (23.272) (22.009) 1.263  (19.947)  (18.865)  1.082 under
Net Council Tax 144.165 148.679 4.514  123.570  127.439  3.869 over rec
General Revenue Grant 254.817 254.817 0.000  218.415  218.415  0.000 -
Non-Domestic Rates 422.591 422.591 0.000  362.221  362.221  0.000 -
Transfer from Reserves 73.355 73.355 0.000  73.355  73.355  0.000 -
Total Income 894.928 899.442 4.514  777.561  781.430  3.869 over rec              
Net Expenditure / (Income)  0.000 (39.311) 39.311  (47.579)  (59.538)  11.959 under           
16

Page 17

Appendix 2 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (AFTER Transfers) 
Period Ended 24 February 2023 (No.12) 
Committee 
Annual
Budget 
Annual
Forecast
AFTER
Transfers  
Annual
Forecast
Variance
AFTER
Transfers 
Budget
Proportion
to 24/02/23 
Actual 
to 
Period 10
24/02/23 
Variance 
to
24/02/23 
Departments: £m £m £m  £m  £m  £m 
Community and Enterprise Resources 129.813 129.806 0.007  111.496  111.520  (0.024) under
Facilities, Waste and Grounds 75.641 75.114 0.527  64.400  63.930  0.470 under
Leisure and Culture Services 23.942 23.930 0.012  21.493  21.479  0.014 under
Planning and Regulatory Services 5.138 4.096 1.042  4.530  3.609  0.921 under
Enterprise and Sustainable Development 6.958 6.844 0.114  6.108  5.967  0.141 under
Roads, Transportation and Fleet 18.134 19.822 (1.688)  14.965  16.535  (1.570) over
Education Resources 397.586 397.586 0.000  340.677  340.677  0.000 -
Education 397.586 397.586 0.000  340.677  340.677  0.000 -
Finance and Corporate Resources 48.242 48.242 0.000  50.024  50.024  0.000 -
Finance Services - Strategy 2.129 2.141 (0.012)  3.116  3.026  0.090 under
Finance Services - Transactions 23.789 23.295 0.494  21.232  20.799  0.433 under
Audit and Compliance Services 0.376 0.376 0.000  0.569  0.578  (0.009) over
Information Technology Services 5.304 5.340 (0.036)  7.678  7.741  (0.063) over
Communications and Strategy Services 3.353 3.504 (0.151)  2.888  2.980  (0.092) over
Administration and Licensing Services 4.274 4.747 (0.473)  4.359  4.725  (0.366) over
Personnel Services 9.017 8.839 0.178  10.182  10.175  0.007 over
Housing and Technical Resources 19.145 19.487 (0.342)  19.397  19.627  (0.230) over
Housing Services 9.830 9.830 0.000  8.432  8.432  0.000 -
Property Services 9.315 9.657 (0.342)  10.965  11.195  (0.230) over
Social Work Resources 216.286 216.286 0.000  189.194  189.194  0.000 -
Performance and Support Services 7.084 6.405 0.679  6.432  5.653  0.779 under
Children and Families 42.988 44.144 (1.156)  38.573  39.974  (1.401) over
Adults and Older People 165.086 165.086 0.000  143.107  142.942  0.165 under
Justice and Substance Misuse 1.128 0.651 0.477  1.082  0.625  0.457 under
Joint Boards 2.152 2.152 0.000  1.928  1.928  0.000 -               
813.224 813.559 (0.335)  712.716  712.970  (0.254) over           
Committee 
Annual
Budget 
Annual
Forecast
AFTER
Transfers  
Annual
Forecast
Variance
AFTER
Transfers 
Budget
Proportion
to 24/02/23 
Actual 
to 
Period 10
24/02/23 
Variance 
to
24/02/23 
£m £m £m  £m  £m  £m 
Service Departments Total 813.224 813.559 (0.335)  712.716  712.970  (0.254) over
CFCR 0.514 0.514 0.000  0.000  0.000  0.000 -
Loan Charges 35.041 33.861 1.180  0.000  0.000  0.000 -
Corporate Items 28.729 26.382 2.347  17.266  15.996  1.270 under
Corporate Items – Strategy (Tfr to Reserves) 17.420 22.116 (4.696)  0.000  0.000  0.000 -
Investments – 2022/23 (Tfr to Reserves) 0.000 0.000 0.000  0.000  0.000  0.000 -           
Total Expenditure 894.928 896.432 (1.504)  729.982  728.966  1.016 under           
Council Tax 167.437 169.078 1.641  143.517  144.694  1.177 over rec
Less: Council Tax Reduction Scheme (23.272) (23.409) (0.137)  (19.947)  (20.265)  (0.318) over
Net Council Tax 144.165 145.669 1.504  123.570  124.429  0.859 over rec
General Revenue Grant 254.817 254.817 0.000  218.415  218.415  0.000 -
Non-Domestic Rates 422.591 422.591 0.000  362.221  362.221  0.000 -
Transfer from Reserves 73.355 73.355 0.000  73.355  73.355  0.000 -
Total Income 894.928 896.432 1.504  777.561  778.420  0.859 over rec           
Net Expenditure / (Income)  0.000 0.000 0.000  (47.579)  (49.454)  1.875 under           
17

Page 18

Appendix 3 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 24 February 2023 (No.12) 
Housing Revenue Account 
Annual
Budget 
Forecast 
for Year 
Annual
Forecast
Variance 
Budget
Proportion
to 24/02/23
Actual
to Period 10
24/02/23
Variance
to
24/02/23 
% Note 
£m £m £m  £m £m £m   
Employee Costs 14.641 14.140 0.501  13,021  12,755  266  under 2.0% 1
Property Costs 46.906 53.424 (6.518)  40,515  44,143  (3,628) over (9.0%) 2
Supplies & Services 0.609 1.021 (0.412)  498  498  0  - 0.0% 
Transport & Plant 0.195 0.183 0.012  111  104  7  under 6.3% 
Administration Costs 5.644 5.593 0.051  397  350  47  under 11.8% 3
Payments to Other Bodies 3.030 3.054 (0.024)  1,820  1,843  (23) over (1.3%) 
Payments to Contractors 0.100 0.080 0.020  82  78  4  under 4.9% 
Transfer Payments 0.000 0.000 0.000  0  0  0  - 0.0% 
Financing Charges 26.050 26.050 0.000  26,117  26,117  0  - 0.0% 
Total Controllable Expenditure 97.175 103.545 (6.370)  82.561 85.888 (3.327) over (4.0%) 
Total Controllable Income (112.000) (112.475) 0.475  (91.451) (91.778) 0.327 over
recovered  0.4% 4
Transfer to/(from) Balance Sheet (3.500) (5.840) 2.340  (2.961) (5.206) 2.245 over
recovered 75.8% 5
Net Controllable Expenditure (18.325) (14.770) (3.555)  (11.851) (11.096) (0.755) over (6.4%) 
Add: Non Controllable Budgets       
Financing Charges 18.325 14.770 (3.555)  14.389 13.634 0.755 over
recovered 0.0% 
Total Budget 0.000 0.000 0.000  2.538 2.538 0.000 - 0.0% 
Variance Explanations 
1. Employee Costs
The underspend is due to higher than anticipated staff turnover. 
2. Property Costs
The net overspend reflects the current cost and volume of repairs and maintenance. 
3. Administration Costs
A large element of this underspend is due to the demand led legal expenses and the underspend reflects the current level of activity. 
4. Total Controllable Income
Rental income from council housing is higher than forecast due to favourable timing of new build and purchased units being available to rent. 
5. Transfer to (from) Balance Sheet
The net combined overspend year to date requires for a higher than budgeted level of transfer to reserves. 
6. Financing Charges
The overall level of debt charges was lower than anticipated due to the profile of funding requirements.
18

Page 19

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 29 March 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Programme 2022/2023 Update and Monitoring
for Period 12 – 1 April 2022 to 24 February 2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2022 to 24
February 2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-  
(1) that the Period 12 position (ended 24 February 2023) of the General Fund
Capital Programme itemised at appendices 1 to 4 and the Housing Capital
Programme at Appendix 5, be noted;
(2) that the adjustments to the General Fund Programme listed at sections 4.2 and
Appendix 1, be approved; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 24 February 2023 (Period 12).  Spending has been split into 2 separate sections:- 
 General Fund Capital Programme including Education, Social Work, Roads and
Transportation and General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme
4.1. 2022/2023 Budget:  The budget agreed at Executive Committee on 1 February 2023
was £78.396 million.  This revised programme consists of the base budget plus carry
forward projects and adjustments which have been agreed by the Executive
Committee up to and including its meeting on 1 March 2023.   
4.2. The total programme of £78.396 million includes new adjustments to the programme,
which are proposed in this report at Appendix 1.  These adjustments total £0.180
million and include additional funding for new projects.  Due to the timing of project
4
19

Page 20

spend, it is anticipated that this funding will slip into 2023/2024 and the net impact on
the 2022/2023 Capital Programme is, therefore, nil.    
4.3. The total programme is detailed in Appendix 2.  There is no movement from the last
report to this Committee (1 March 2023). 
4.4. Programmed funding for the year also totals £78.396 million.  The funding available to
support the programme is detailed in Appendix 3.   
4.5. 2022/2023 Outturn:  As reported previously, estimates from Resources suggested an
outturn of around £73 million, a net underspend across Resources of £5.3 million
against the revised budget of £78.396 million.  The majority of the variance is due to
the timing of spend, resulting in budget required in 2023/2024 rather than 2022/2023. 
4.6. As at 24 February 2023, work continues to clarify the predicted spend position for the
General Services Capital Programme for the remainder of this financial year.  Funding
for projects remaining underspent at the financial year-end will be carried forward to
allow the projects to be completed in 2023/2024.  Again, this is a timing issue only with
funding for the overall spend on these projects already identified into next financial
year.  Officers will continue to work to maximise spend in 2022/2023, where possible.   
4.7. A list of the main projects making up the predicted £5.3 million underspend as declared
previously, and which will now complete in 2023/2024, is included in Appendix 4.  This
Appendix also includes their anticipated completion dates. 
4.8.  Period 12 Position:  The programme spend and funding for the General Fund is
included in Appendix 3.  As noted in 4.1, the total capital spending programme for the
year is £78.396 million.   
4.9.  Appendix 3 also shows budget for the period of £46.008 million and spend to the 24
February 2023 of £45.607 million, an underspend of £0.401 million.  This is mainly due
to the timing of spend of the Roads Investment Programme (£0.970 million) and City
Deal project at Greenhills Road (£0.300 million), both within Community and
Enterprise Resources, being less than anticipated at this stage.  This is offset by good
progress on the Oracle Fusion project within Finance and Corporate Resources
(£0.850 million).   
4.10.  Actual funding received to 24 February 2023 is £70.470 million.   
4.11. Relevant officers will continue to closely monitor the generation of all income. 
5. Housing Capital Programme
5.1. 2022/2023 Budget:  Appendix 5 summarises the position on the Housing programme
as at 24 February 2023.  The revised capital programme for the year is £66.361 million,
as approved by the Executive Committee on 24 August 2022. There are no new
adjustments proposed in this report. 
5.2. Programmed funding for the year also totals £66.361 million.  The funding sources are
also detailed in Appendix 5. 
5.3. 2022/2023 Outturn:  Revised estimates from Housing and Technical Resources
suggest there will now be an underspend of £8.039million within the Housing Capital
Programme by the end of the financial year.  This is an increase of £3.9 million on the
underspend reported last period.  As advised previously, the underspend is mainly
20

Page 21

due to a number of factors, including operatives from Property Services being diverted
away from capital investment to tackle urgent flooding damage, delays in external
fabric projects due to the suspected presence of bats, reduced owner uptake for
external works and higher than normal volumes of no access for legislative works. 
5.4. The projected underspend above also now includes the impact of an expected delay
to the completion of the Kirk Street, Strathaven New Build Development.  This
development was due to be handed to the Council in March 2023 but was delayed
due to circumstances out with the Council’s control.  This is now planned to complete
in April 2023 and spend of £2.9 million on that project will fall into the new year.  
5.5. Work to monitor achievable spend will continue as we approach the end of the financial
year. Funding for projects remaining underspend at the financial year-end will be
carried forward to allow the projects to be completed in 2023/2024. 
5.6. Period 12 Position:  Budget for the period is £50.039 million and spend to 24
February 2023 amounts to £46.245 million, an underspend of £3.794 million and this
mainly reflects the issues detailed in Sections 5.3 to 5.4 above. 
5.7. As at 24 February 2023, £46.245 million of funding had been received. 
5.8. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee. 
6. Employee Implications
6.1. There are no employee implications as a result of this report. 
7. Financial Implications
7.1. The financial implications are contained in sections 4 and 5 of the report for the
General Services and Housing capital programmes respectively. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Capital Programme is an overspend. 
There are detailed project management plans prepared and the risk of overspend on
each project is monitored through four weekly investment management meetings. 
9.2. The Council continues to experience material shortages, longer lead times and
extraordinary inflationary price increases and it is anticipated that this will continue to
impact the supply chain for the foreseeable future.  The impact of this will continue to
be monitored through the four weekly investment management meetings.  Further
updates will be reported in the coming months with any significant increases in
contract values being brought to members’ attention.   
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
21

Page 22

10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
8 March 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 24 August 2022
 Executive Committee, 1 March 2023 
List of Background Papers
 Capital Ledger prints to 24 February 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
22

Page 23

APPENDIX 1
SOUTH LANARKSHIRE COUNCIL          
CAPITAL EXPENDITURE 2022/2023
GENERAL SERVICES PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 24 FEBRUARY 2023 
Proposed Adjustments – Period 12 
Community and Enterprise Resources 
Chatelherault Allotments
The 2022/2023 Capital Programme already includes an allocation (£0.120 million)
to create allotments at the former Garden Centre site within Chatelherault Country
Park, which is now vacant.  The tender exercise is now complete and contributions
from the Food Strategy Support Fund (£0.100 million) and Community and
Enterprise Resources Revenue budget (£0.080 million) have been identified to
augment the existing budget allocation.  This will allow the project to progress. 
Due to the profiling of project expenditure, this element of the budget will not be
required until 2023/2024.  Approval is sought to slip this additional funding of
£0.180 million into the 2023/2024 Capital Programme.   
£0.180m 
(£0.180m)  
TOTAL ADJUSTMENTS  -   
23

Page 24

APPENDIX 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2022/2023       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 24 FEBRUARY 2023 
£m  
Total Budget (Executive Committee – 1 March 2023) 78.396  
Proposed Adjustments – Period 12 (Section 4.2 and Appendix 1) -  
Total Revised Budget (Executive Committee – 31 March 2023) 78.396   
2022/23
Budget 
Period 12
Proposed
Adjustments   
Revised
2022/23
Budget
Resource £m £m £m    
Community & Enterprise 48.444 - 48.444
Education 13.918 - 13.918
Finance & Corporate 3.695 - 3.695
Housing & Technical 8.436 - 8.436
Social Work 3.903 - 3.903
Other Match Funding - - -    
TOTAL CAPITAL PROGRAMME 78.396 - 78.396      
24

Page 25

APPENDIX 3
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2022/2023       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 24 FEBRUARY 2023 
2022/2023
Original
Estimate inc
C/F 
2022/2023
Revised
Budget 
2022/2023
Budget to
24/02/23 
2022/2023
Actual to
24/02/23     
Expenditure £m £m £m £m     
General Fund Programme 95.232 78.396 46.008 45.607 
Income
2022/2023
Budget
2022/2023
Revised
Budget 
2022/2023
Actual
To
24/02/23         
£m         £m  £m
Prudential Borrowing 55.416 30.260  30.260
Developers Contributions 6.552 0.058  0.058
Partners (Including High Blantyre Construction,
SPT, Sustrans, and CARES)
1.745 3.989  1.454
Scottish Government:     
- Capital Grant 22.424 32.074  30.180 
- Cycling, Walking and Safer Routes 2.154 2.887  1.180 
- Vacant and Derelict Land 1.820 1.228  0.728 
- Regeneration Capital Grant  1.720 1.370  0.157 
- Town Centre Regeneration Fund 0.101 0.101  0.101 
- Place Based Investment Programme 1.617 3.357  3.357 
- Electric Vehicle Charging
Infrastructure
0.118 0.118  0.089 
- NSS Tec 0.000 0.040  0.040
Glasgow City Region City Deal 0.000 0.000  0.006
Capital Receipts 1.000 1.000  0.946
Specific Reserves 0.534 1.400  1.400
Revenue Contribution 0.031 0.514  0.514     
TOTAL FUNDING 95.232 78.396  70.470 
25

Page 26

APPENDIX 4
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2022/2023
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2020 TO 24 FEBRUARY 2023 
Projects with Projected Underspends in 2022/2023 
which will Carry Forward into 2023/2024
Project Name Project Type Completion Date   
Community and Enterprise Resources  
Library IT Infrastructure Upgrade Phase 2 –
Desktop Refresh 
Infrastructure Summer 2023
Phillipshill Cemetery - Extension Infrastructure March 2024
Springhall Urban Greenspace Development
(Springhall Cage) - Play Equipment
Equipment Summer 2023
Halfway Park Play Area - Redevelopment Infrastructure April 2023
Chatelherault Allotments Infrastructure June 2023
Play Parks - Various Infrastructure Throughout
2023/2024 and
beyond
Greenhall Replacement Bridge - Design Infrastructure March 2024
Alexander Hamilton Memorial Park Woodland
Management
Infrastructure Throughout
2023/2024
Larkhall Leisure Centre - Design
(Place Based Investment Funding)
New Build Throughout
2023/2024
Lanark Library, Lindsay Institute – Roof and
Windows
Improvements Throughout
2023/2024
Town Centre Regeneration Fund Regeneration Throughout
2023/2024
Vacant & Derelict Land - Cuningar Loop Phase 3
Greening
Regeneration February 2024
City Deal - Calderside Academy Adaptations October 2025
City Deal - Holy Cross High Adaptations October 2025
City Deal - Lanark Road Signalisation Infrastructure December 2023
City Deal - Cathkin Bypass – Grant Payments Only Grants Throughout
2023/2024
Daer Bridge Infrastructure December 2023   
Education Resources  
Castlefield Primary School Extension Extension July 2023
Crawforddyke adaptation of nursery to classrooms Adaptations June 2023
Uddingston Nursery Expansion  Adaptations August 2024
Clyde Terrace Early Years New Build November 2023
Small Scale Adaptations Adaptations Throughout
2023/2024   
Finance and Corporate Resources  
Digital Tools Infrastructure Throughout
2023/2024
26

Page 27

Digital Connectivity Infrastructure Throughout
2023/2024
Digital Transformation  Infrastructure Throughout
2023/2024
Projects with Projected Underspends in 2022/23 
which will Carry Forward into 2023/2024  
Project Name Project Type Completion Date
Housing and Technical Resources   
Prioritised Urgent Investment Refurbishment Throughout
2023/2024
Principal Offices - Fabric and Service Investment Refurbishment Throughout
2023/2024
Lifecycle Replacement Schools Refurbishment Throughout
2023/2024
New Cross Shopping Centre - Roof Refurbishment Throughout
2023/2024
Civic Centre Fabric Upgrade Refurbishment Throughout
2023/2024
Communities Facilities Fund Refurbishment Throughout
2023/2024
CEEF Programme Refurbishment Throughout
2023/2024 
27

Page 28

APPENDIX 5
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2022/2023
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2022 TO 24 FEBRUARY 2023 
2022/2023
Original
Budget
2022/2023
Revised
Budget
2022/2023
Budget to
24/02/23
2022/2023 
Actual to
24/02/23 
£m £m £m £m
Expenditure 
2022/2023 Budget 
Incl. adjustment from 2021/2022 
52.230  66.361  50.039  46.245 
2022/2023
Original
Budget
2022/2023
Revised
Budget 
2022/2023
Actual to
24/02/23 
£m £m  £m
INCOME    
Capital Receipts 0.000 7.311  7.302
Capital Receipts - Land Sales 0.000 0.000  0.018
Capital Funded from Current Revenue 26.050 26.050  26.050
Prudential Borrowing 22.018 26.462  5.435
Scottish Government Specific Grant:    
- New Build 2.242 4.048  6.083
- Open Market Purchase Scheme 1.800 2.370  1.302
- Mortgage to Rent 0.120 0.120  0.055 
52.230 66.361  46.245 
28

Page 29

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 29 March 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Additional Funding from Scottish Government and
Other External Sources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (1 March 2023)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £6.159 million, detailed in Appendix 1, be
noted. 
3. Background
3.1. The Council is periodically advised of additional funding which is made available
from the Scottish Government and other sources to enable various initiatives to be
undertaken. 
3.2. Additional funding may either be paid through the General Revenue Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding are attached at Appendix 1 to the report. The report
details additional funding that has been reported by Resources as part of the
additional resources notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £2.301 million has been identified for 2022/2023 and
£3.858 million for 2023/2024, including the additional allocation of funding for specific
policy areas, notified as part of the Local Government Finance Order (received 2
March 2023).   
5.2. No additional Capital funding has been identified since the last report to Committee. 
The total additional Revenue funding of £6.159 million is detailed in Appendix 1. 
5
29

Page 30

5.3. Resource budgets will be updated to reflect this additional funding as required, and
where appropriate, details of spending plans will be presented to Resource
Committees for approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning 
Executive Director (Finance and Corporate Resources) 
8 March 2023 
Link(s) to Council Vision/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 1 March 2023 
List of Background Papers
 Additional Funding Reports 8 February 2023 to 8 March 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
30

Page 31

Appendix 1 
Additional Revenue Funding 
Resource  Description  2022/2023
£m 
2023/2024
£m 
Total
£m 
Method
Finance and
Corporate
Scottish Welfare Fund – Top-Up
Allocation (2022/2023) 
0.155 - 0.155 Scottish 
Government
Education
Resources 
Contribution to Teachers’ Pay
Award (2022/2023)
2.146 - 2.146 Scottish
Government 
(Finance Order)
Finance and
Corporate
Discretionary Housing Payment - 3.858 3.858 Scottish
Government
(Finance Order) 
TOTAL REVENUE FUNDING 2.301 3.858 6.159 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 29 March 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Police Scotland Local Police Plan 2023 to 2026 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval for the Lanarkshire Local Police Plan 2023 to 2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted; and
(2) that the Lanarkshire Local Police Plan 2023 to 2026, as detailed in Appendix 1,
be approved.
[1recs]
3. Background
3.1. As a statutory requirement of the Police and Fire Reform (Scotland) Act 2012 the local
Police Commander is required to prepare a Local Police Plan that sets out the strategic
priorities and objectives for policing in a local authority area. Once prepared, this plan
is presented to the local authority for approval. 
3.2. Local policing plans are aligned with the Scottish Government’s outcomes and
priorities included in the Justice Strategy, “The Vision for Justice in Scotland”
published in February 2022. 
3.3. The previous South Lanarkshire Local Police Plan covered the period 2020 to 2023
and was approved by the council’s Executive Committee on 25 March 2020. 
3.4. A pan-Lanarkshire Local Police Plan is developed as Police Scotland’s Lanarkshire
Division covers both North Lanarkshire and South Lanarkshire local authority areas. 
3.5. The Lanarkshire Local Police Plan explains how Lanarkshire Police Division will
deliver on local priorities over the next 3 years (2023 to 2026) and is linked to Police
Scotland’s strategic aims and outcomes. 
4. Development and consultation 
4.1. In developing the proposed Local Police Plan, Police Scotland undertook informal and
formal consultation with the public and a range of stakeholders to help determine what
the local priorities and objectives should be. 
4.2. The formal consultation closed on 12 February 2023 and South Lanarkshire Council
submitted a positive response, which was approved by the Council’s Corporate
Management Team on 9 February 2023.
6
33

Page 34

5. Lanarkshire Local Police Plan 2023 to 2026
5.1. Three local policing priorities were identified through consultation including:- 
1. ‘Protecting our communities’ which is focused on a commitment to a prevention
and early intervention approach to crime and disorder, to intelligence-led policing,
to meaningful community engagement, and to collaborative partnerships. 
2. ‘Safeguarding our citizens’ which is focused on those most vulnerable to the risk
of harm, to those at risk of drug death, and to those at risk of gender based abuse.
Included within this priority is a commitment to passing those who are vulnerable
and at greater risk of harm to relevant care or health providers, as appropriate. 
3. ‘Enhancing our service’ which is focused on the quality and the well-being of
officers and staff, and on transparency and accountability over decision making
and policing direction. This includes a commitment to target finite resources where
and when they are needed, and a commitment to transform the police estate. 
5.2. Combined, these priorities aim to improve the safety and wellbeing of the people and
communities in Lanarkshire. 
5.3. The consultation identified a range of objectives under each priority which will provide
the focus of Lanarkshire Police Division’s activity throughout the life of the plan. 
Table One: Lanarkshire Local Police Plan 2023 to 2026, Priorities and Objectives
Priorities Protecting our
Communities
Safeguarding our
Citizens
Enhancing our
Service
Objectives Violent crime Substance induced
harm
Continuous
improvement
Antisocial behaviour Gender based
abuse
Workforce wellbeing
Sexual crime  Online safety Operational resilience
Acquisitive crime Protecting our most
vulnerable 
Serious organised
crime
Road safety 
5.4. Focusing on the local policing priorities, Lanarkshire Police Division aims to deliver on
5 strategic outcomes:- 
 Threats to public safety and wellbeing are resolved by a proactive and responsive
police service.
 The needs of local communities are addressed through effective service delivery.
 The public, communities and partners are engaged, involved and have
confidence in policing.
 Our people are supported through a positive working environment, enabling them
to serve the public.
 Police Scotland is sustainable, adaptable and prepared for future challenges. 
5.5. The plan has a clear strategic thread running from the Justice Strategy, through Police
Scotland’s strategies, plans and performance reporting. The plan also has clear links
to wider Community Planning arrangements and with Local Outcome Improvement
Plans taken into account in their development. 
34

Page 35

5.6. The Safer South Lanarkshire Board (SSLB) has the responsibility for the scrutiny of
local policing plans on behalf of the Council to assess police performance and
progress against the outcomes and objectives detailed in the Local Police Plan. The
Lanarkshire Local Police Plan 2023 to 2026 was fully endorsed by SSLB at its meeting
on 13 March 2023. 
5.7. The full proposed Lanarkshire Local Police Plan 2023 to 2026 is provided in Appendix
1. 
6. Employee Implications
6.1. There are no employee implications associated with this report.  
7. Financial Implications
7.1. There are no financial implications associated with this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. This report does not introduce a new policy, function or strategy which impacts
negatively on the natural environment, climate change or sustainability. 
8.2.  Lanarkshire Police Division aims to make a significant positive contribution to the
Scottish Government’s 2040 carbon neutral target and 2045 zero greenhouse gas
emissions target through delivery of its Local Police Plan. 
8.3. A Strategic Environmental Assessment (SEA) pre-screening determination was not
required as a result of this report. 
9. Other Implications
9.1. There are no other implications as a result of this report. 
9.2. The content of this report will contribute to the evidence to support the requirements
of the Annual Assurance Statement. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
15 March 2023 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs.
 Accountable, effective, efficient and transparent.
 Ambitious, self-aware and improving.
 Fair, open and sustainable. 
Previous References
 Police Scotland – Local Police Plan 2020-2023, Executive Committee, 25 March 2020
 Police Scotland – Local Police Plan 2023-2026, Safer South Lanarkshire Board, 13
March 2023 
List of Background Papers
 None
35

Page 36

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Stephen Gibson, Executive Director (Housing and Technical Resources)
E-mail: stephen.gibson@southlanarkshire.gov.uk 
36

Page 37

OFFICIAL 
OFFICIAL
Lanarkshire Local Policing Plan  
6
37

Page 38

OFFICIAL 
OFFICIAL
Contents
Lanarkshire Local Policing Plan ................................................................................. 1
Foreword ................................................................................................................ 3
Introduction ............................................................................................................. 5
National strategic alignment ................................................................................... 6
Police Scotland’s strategic objectives ..................................................................... 7
Local policing delivery context ................................................................................ 8
Local priorities ...................................................................................................... 10
Local objectives and activity .............................................................................. 14
Threats to public safety and wellbeing are resolved by a proactive and
responsive police service .................................................................................. 14
The needs of local communities are addressed through effective service delivery
.......................................................................................................................... 18
The public, communities and partners are engaged, involved and have
confidence in policing ........................................................................................ 20
Our people are supported through a proactive working environment, enabling
them to service the public ................................................................................. 22
Police Scotland is sustainable, adaptable and prepared for future challenges . 26
Governance and performance .............................................................................. 28
Equality, diversity and inclusion ............................................................................ 28
Engaging with us .................................................................................................. 29 
38

Page 39

OFFICIAL 
OFFICIAL
Foreword
Lanarkshire is an exceptional place to live, work or visit and I am honoured to lead
the police officers and staff who serve such a diverse, dynamic community.
Recent events including the response to the coronavirus pandemic, the United
Nations COP26 climate summit and the passing of Her Majesty, the late Queen
Elizabeth II, have placed extraordinary pressure on policing and the wider public
services across Scotland. I am immensely proud of the significant contribution made
by the officers and staff of Lanarkshire Division in support of those events,
particularly when considered alongside the exceptional concurrent demands of
providing a first class policing service to the citizens and communities of Lanarkshire. 
Policing in Lanarkshire is demanding, it is relentless and it is far more than a job to
those who serve. It requires steadfast dedication, determination and resilience. As
the Chief Constable has repeatedly said of officers and staff; ‘it’s not what we do, it’s
what we are.’
By virtue of unique powers and responsibilities, police officers are the embodiment of
human rights practitioners. As the Local Police Commander, I am resolute in my
expectation that all officers and staff in Lanarkshire Division will police with courage,
with compassion and with consistency, leading by example in their actions and
making values based decisions that are able to withstand all legitimate scrutiny. 
As we enter 2023, Lanarkshire Division remains focused on providing the very best
policing service to our communities. This is not without significant challenges both
operationally and organisationally. The cost of living crisis is having a profound
impact on individuals, families and communities, with our most vulnerable citizens
experiencing the most acute pressure. Policing, and the officers and staff who serve
Lanarkshire, is by no means insulated from such financial pressures and I will do
everything I can to support those who provide that essential public service.
Under the Police and Fire Reform (Scotland) Act 2012, the Chief Constable has a
statutory responsibility for the policing of Scotland and the designation of Local
Police Commanders for each local authority area. Local Police Commanders must
then prepare and submit a Local Police Plan to their local authorities for approval.
My Local Police Plan for 2023-26 sets out three key priorities; Protecting our
communities, Safeguarding our citizens and Enhancing our service. The priorities
39

Page 40

OFFICIAL 
OFFICIAL
should not be viewed in isolation but together, as one consolidated ambition; to
improve the safety and wellbeing of the people and communities in Lanarkshire. 
The priorities were set following consideration of a range of sources including the
analysis of current and emerging demand for policing services and the plans and
ambitions of our partners. Formal and informal consultation with individuals and
groups proved invaluable in helping us to truly understand what matters most to the
citizens and communities we serve and the professional experience and opinions of
our officers and staff provided a crucial, irreplaceable perspective that added yet
further value. 
This approach has ensured that our priorities seek to address what our communities
are most concerned about and are strategically aligned to the desired outcomes of
our partners at both a local and national level, with who will work tirelessly in pursuit
of shared objectives. 
Lanarkshire Division is ready to meet the challenges that are before us and as the
Local Police Commander I will personally drive improvements to continuously
enhance the service we provide to the people of Lanarkshire.   
Chief Superintendent Stevie Dolan, Local Police Commander, Lanarkshire Division  
40

Page 41

OFFICIAL 
OFFICIAL
Introduction 
Lanarkshire Division serves the local authority areas of North Lanarkshire Council
and South Lanarkshire Council, the fourth and fifth largest local authorities in
Scotland. 
Lanarkshire has a population of two thirds of a million people, an eight of the entire
population of Scotland, and covers an area of approximately 870 square miles. The
area has an enviable history, including two UNESCO World Heritage sites; New
Lanark and the Antonine Wall and has been home to many world famous people;
from the missionary David Livingstone to the footballer Sir Matt Busby.
The area is as diverse as its people, ranging from urban areas associated with
traditional industry, such as Motherwell and Coatbridge, to the rural farming
communities of Clydesdale and the new towns of East Kilbride and Cumbernauld.
The Community Planning Partnerships of North and South Lanarkshire have
ambitious plans to improve outcomes for all citizens and communities. The Plan for
North Lanarkshire and the South Lanarkshire Community Plan both provide a clear
framework, which enables partners to coalesce around a shared ambition and a
series of priorities to which we can all make a meaningful contribution.
Despite a great many successes, challenges remain. Partners are unwavering in
their collective determination to reduce poverty and vulnerability, while increasing
attainment and growth, which contributes to safety and security. Policing plays an
active part across Community Planning Partnership activities and multiagency
groups, as contributors to a shared response to important issues at a local and
national level. 
Our Local Police Plan priorities support this collaborative aspiration and will be
reviewed regularly to ensure they remain current, meaningful and supportive of the
wider partnership objectives.  
41

Page 42

OFFICIAL 
OFFICIAL
National strategic alignment
Our strategic outcomes provide a clear route from the Scottish Government’s
outcomes and priorities, including the Justice Strategy, through Police Scotland’s
strategies, plans and performance reporting, enabling us to demonstrate alignment
and clearly articulate our ambitions and progress as demonstrated below. In addition
to the Annual Police Plan, Police Scotland’s thirteen Local Policing Divisions produce
Local Police Plans which reference distinct priorities, objectives, outcomes and
performance measures. They link to wider community planning arrangements, with
Local Outcome Improvement Plans taken into account in their development.
 Scottish Government National Outcomes/Strategic Priorities/Justice Vision
 SPA/Police Scotland Strategic Outcomes
 Long Term Policing Strategy: Policing for a Safe, Protected and Resilient
Scotland
 Enabler strategies including People, Fleet, Estates, Public Contact and
Engagement, Enabling Policing for the Future, Digital Data and ICT, Cyber,
Environmental, Procurement, Violence against Women and Girls, Equality
Diversity and Inclusion
These are underpinned by plans including the Strategic Workforce Plan, Annual 
Police Plan, Local Police Plans, Local Outcome Improvement Plans, and 
Financial Plans. 
42

Page 43

OFFICIAL 
OFFICIAL
Police Scotland’s strategic objectives 
43

Page 44

OFFICIAL 
OFFICIAL
Local policing delivery context
The purpose of Police Scotland is to improve the safety and wellbeing of people,
places and communities in Scotland and, working in collaboration with others, we
seek to achieve that purpose in a way that is accessible to and engaged with local
communities, and promotes measures to prevent crime, harm and disorder.
Lanarkshire Division is the second largest of the 13 territorial Local Police Divisions
in Police Scotland. We are led by a Local Police Commander in the rank of Chief
Superintendent, who is supported by three Superintendents and one Detective
Superintendent. 
Lanarkshire is divided into four policing areas, two in each local authority area. Each
of the four policing areas is led by a Local Area Commander in the rank of Chief
Inspector and they are responsible for delivery of the Local Policing Plan priorities in
their respective areas.
In North Lanarkshire the two policing areas are geographically in line with the
Community Board areas of:
1. Motherwell, Wishaw, Bellshill and Shotts
2. Coatbridge, Airdrie, Cumbernauld, Kilsyth and the Northern Corridor
In South Lanarkshire the two policing areas are aligned to the locality areas of:
1. East Kilbride, Cambuslang and Rutherglen  
2. Hamilton and Clydesdale
Policing extends far beyond the visible front line of emergency response and
community policing officers that are the public face of policing in Lanarkshire and
with whom they are most familiar. This is more applicable as we provide services
within a digital world.
At a local level, Lanarkshire Division has an extensive CID and Public Protection
capability that, under the leadership of three Detective Chief Inspectors, deal with a
wide range of serious, series and complex crime; from dismantling organised crime
groups to investigating the most heinous sexual offences.
44

Page 45

OFFICIAL 
OFFICIAL
Regionally, we are supported by a number of specialist departments including Area
Control Rooms & Service Centres, Armed Policing, Major Investigation Teams,
Police Dog Units and Road Policing Units.   
At a national level, Lanarkshire Division has access to further specialist assets such
as Air Support, Dive & Marine Unit, National Rape Investigation Unit, Mountain
Rescue and the Human Trafficking Unit.
Policing in Lanarkshire is without question a collective, collegiate effort in which
every single officer and member of police staff makes a valuable contribution in
keeping our communities safe. 
45

Page 46

OFFICIAL 
OFFICIAL
Local priorities
The demands on policing in Lanarkshire and across Scotland continue to evolve at
pace. The role of the police is far broader than traditional law enforcement and
extends to protection, prevention and working in partnership to ensure long term
solutions to complex, multifaceted problems.
To respond effectively to the issues that matter most to our communities and pose
the greatest risk of harm to our citizens, Lanarkshire Division has identified three key
priorities that will be the focus of our activity throughout the life of this Local Policing
Plan; Protecting our communities, Safeguarding our citizens and Enhancing our
service. 
Protecting our communities
Our communities rightly demand that policing protects them from crime and disorder.
We will be relentless in our pursuit of those who harm, or seek to harm, our citizens.
We will use all available police and partner information and fully engage with the
community at a local level to ensure we are directly accessible, transparent and
immediately accountable. Only through meaningful, community engagement will we
maintain and build the public trust and confidence that enables us to fully understand
community concerns, such as violence, antisocial behaviour, theft or sexual crime.
Working with the public and our partners we will ensure that we have the right police
resources in the right place at the right time to deter and detect crime. We will
consider what initiatives have worked well elsewhere and determine if they could be
applied in Lanarkshire. 
We will develop a prevention plan that will encourage innovation from our officers
and staff to try new tactics and evaluate the impact of their work. In doing so we will
consider the underlying causes of issues and seek to address them through early
and effective intervention with those on the cusp of criminality, whether through
vulnerability, association or desire. 
Our intelligence and analytical functions will provide the earliest indication of any
emerging trends and use historical data and professional expertise to predict likely
demands. This will allow us to act swiftly and decisively in the interest of our
communities, thereby minimising the risk of harm to our fellow citizens.
46

Page 47

OFFICIAL 
OFFICIAL
We will work with our partners to tackle Serious Organised Crime, which inflicts such
damage and misery to the very fabric of our communities, and drive the development
of a multiagency action plan that will deprive those involved in such activity of both
the will and resources to continue in their criminal endeavours.     
Safeguarding our citizens
It is a fundamental tenet of policing that officers and staff should protect those who
cannot protect themselves; the most vulnerable in our community. We will further
enhance our processes and capabilities to identify and support those at most risk of
harm, while recognising that where physical or mental health concerns are dominant
factors in that vulnerability we must immediately transfer care to those who are
professionally qualified to provide it.
The number of drugs deaths in Lanarkshire is simply unacceptable. Each death is
tragic, potentially avoidable and we will utilise our finite resources to pursue those
who produce or supply controlled drugs. We will also work with our partners to
develop a plan to implement the actions and recommendations of the Drug Deaths
Taskforce’s final report, published in July 2022, and in doing so contribute to the
wider effort to reduce the lethal impact of drugs in our communities.
Gender based abuse, including violence against women and girls, is utterly
abhorrent. It has no place in society and we will do everything we can to bring
offenders to justice, while safeguarding those who has taken the brave step to report
such dreadful behaviour and working with our partners to develop a holistic plan to
eradicate this wholly unacceptable conduct.
There has been a sustained rise in online crime in recent years, from online fraud to
child sexual exploitation. Almost all enquiries currently undertaken by police in
Lanarkshire have some form of digital footprint, which adds an additional layer of
complexity and resource intensive investigations. We will continue to develop our
investigative capability in this field, offer advice and education inputs in respect of
online safety and support victims of such crimes.
Lanarkshire has a vast road network, from motorways to country tracks, with which
comes an immense number of road users. Our aim is to reduce the numbers of
deaths or those seriously injured on our roads through intelligence led policing. We
will enhance our analytical capability and work with key local and national partners
47

Page 48

OFFICIAL 
OFFICIAL
responsible for road safety to develop prevention, engineering, engagement and
enforcement activities that mitigate the risk to those who use our roads.
Enhancing our service
We cannot protect our communities or safeguard our citizens without investment in
our officers and staff. It is only through their individual and collective efforts that the
people who visit, work or live in Lanarkshire are safe, secure and supported.
The wellbeing of our workforce is of paramount importance and we will ensure every
officer and member of staff has the opportunity to contribute towards our collective
purpose; to improve the safety and wellbeing of people, places and communities in
Lanarkshire. We will introduce a wellbeing action plan that enhances the physical
and mental wellbeing of our people. In doing so, we will fully engage with relevant
Staff Associations and Trades Unions and do everything we can to eliminate
assaults of our colleagues, which are deplorable and most definitely ‘not part of the
job.’ We are under no illusion as to the extent of stress and strain the intense
demands of policing place on our officers and staff and will take action to mitigate
those pressures. 
Through improved visibility and accessibility of our Senior Leadership Team we will
provide clarity over decisions and direction, enhance accountability and promote a
constructive challenge culture that will lead to improved outcomes for our colleagues,
citizens and communities alike.
To maximise the availability of our dedicated officers and staff, we will analyse the
volume and nature of demand for policing services and develop an operating model
that ensures we always deploy our finite resources where and when they are needed
most, strengthening our operational resilience.
We will implement a training framework, mentoring programme and pursue joint
development opportunities with partners to enhance our capability to respond to the
complex challenges of modern policing, while making best use of available police
technology that will increase the amount of time we spend with citizens in our
communities.
Decades of under investment in our police estate now means that much of it is no
longer fit for purpose. We will identify options to transform our existing estate and,
where possible, collocate with partners in a way that best serves the public and
creates a positive work environment for our dedicated officers and staff. 
48

Page 49

OFFICIAL 
OFFICIAL
Plan on a page
OFFICIAL
PUBLIC HEALTH
PREVENTION & EARLY INTERVENTION
PARTNERSHIPS
Threats to public safety and wellbeing
are resolved by a proactive and
responsive police service
The needs of local communities are
addressed through effective service
delivery
The public, communities and partners
are engaged, involved and have
confidence in policing
Our people are supported through a
positive working environment, enabling
them to serve the public
Police Scotland is sustainable,
adaptable and prepared for future
challenges
Violent
crime
Antisocial
behaviour
Acquisitive
crime
Sexual
crime
Safeguarding our citizens
Our Local
Policing Priorities Our Objectives Strategic Outcomes
PERSON
CENTRED
APPROACH
Our vision | Policing for a safe, protected and resilient Scotland
Our purpose| Improve the safety and wellbeing of people, places and communities in Scotland
Our values | Fairness, Integrity, Respect, Human Rights
Focusing on our local policing priorities, we aim to deliver the positive outcomes highlighted,
whilst promoting Lanarkshire Division’s Vision and helping to deliver the Community Plan
aspirations of both North and South Lanarkshire Councils.
Plan on a Page
Lanarkshire
Enhancing our service
Protecting our communities
Substance
induced
harm
Continuous
improvement
Gender
based
abuse
Workforce
wellbeing
Protecting
our most
vulnerable
Operational
resilience
Road
safety
Online
safety
Serious
Organised
Crime
49

Page 50

OFFICIAL 
OFFICIAL
Local objectives and activity
Threats to public safety and wellbeing are resolved by a proactive
and responsive police service
We find ourselves moving at an ever-increasing pace from the physical to the digital
world; a move that creates new and complex crime types. It also affects traditional
crime, much of which now has a digital element.
To protect our communities effectively, we will continue to explore innovative
technologies and partnerships.
We will continue to be a key contributor to local joint planning and delivery, helping
drive a shift to prevention and early intervention across services. 
Objective: Keep people safe in the physical and digital world 
Activity: We will be relentless in our pursuit of criminals who harm our citizens and
communities
Key milestones:
 Analysis of current/emerging trends, prolific offenders and crime hotspots
 Research of best practice with Community Planning Partners and other police
areas
 Design and implementation of action plans to address issues that matter most to
communities
 Evaluation and learning
Update expected: Y1-3, Quarterly
Performance measures and insights:
 How well does Lanarkshire Division interpret its analytical output?
 How has best practice from partners and other agencies been used to pursue
criminals?
 How effective is Lanarkshire Division at bringing criminals to justice?
 What evaluation and learning has been taken from the action plans? 
50

Page 51

OFFICIAL 
OFFICIAL
Activity: We will improve and enhance our processes for managing and supporting
those identified as being at most risk of harm
Key milestones:
 Improve processes for identification of those at most risk of harm
 Develop a new safety plan process to best support those at most risk of harm
 Enhance support for victims
Update expected: Y1-3, Q2 & Q4
Performance measures and insights: 
 How effectively does Lanarkshire Division identify its most vulnerable citizens?
 What impact has the new safety plan process had?
 How well does Lanarkshire Division support those at most risk of harm? 
Objective: Design services jointly to tackle complex public safety and wellbeing
challenges
Activity: We will develop and implement a multiagency action plan to proactively
target serious organised criminality through effective delivery of the four strands of
Scotland’s Serious Organised Crime Strategy
Key milestones:
 Review ongoing threat, risk and harm posed by Serious Organised Crime Groups
 Design and implement a multiagency action plan that supports the national
strategy
 Delivery plan and update on progress
 Evaluation and learning
 Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How effective is Lanarkshire Division in assessing threat, risk and harm posed by
Serious Organised Crime Groups?
 How successful is Lanarkshire Division in tackling the threat from Serious
Organised Crime?
 What evaluation and learning has been taken from the action plan? 
51

Page 52

OFFICIAL 
OFFICIAL
Activity: We will work with Community Planning Partners to enhance our
understanding of gender based abuse, including violence against women and girls,
in Lanarkshire and reduce the harm it causes
Key milestones:
 Generate intelligence on gender based abuse perpetrators providing tactical
options to proactively target them and reduce offending 
 Analyse crime and incident management data to identify emerging
trends/offenders who present a risk to the public
 Design and implement a multiagency action plan with key Community Planning
Partners including Lanarkshire’s Violence Against Women’s Group (VAWG) to
protect those at risk of harm
 Design, implement and deliver a multiagency survey for key demographic focus
groups (including BAME and seldom held voices in consultations) to understand
how safe women and girls feel in public space
 Establish a preventative, diversionary strategy for offenders
 Deliver continuous professional development to specialist and frontline officers
utilising key stakeholders
Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
 How is Lanarkshire Division working with Community Planning Partners to
mitigate the risk of gender based abuse?
 How effective is Lanarkshire Division at generating and sharing intelligence on
gender based abuse perpetrators?
 How effective is Lanarkshire Division at generating and sharing intelligence on
individuals at serious risk of harm?
 What organisational learning has been captured and shared from multiagency
partners? 
Activity: We will develop a partnership approach that targets drug production/supply
and addresses drug related deaths in Lanarkshire
Key milestones: 
 Gather multiagency data from the Drug Deaths Prevention Group stakeholders to
inform activity
52

Page 53

OFFICIAL 
OFFICIAL
 Develop a multiagency plan that supports the four strands of the Drug Deaths
Task Force final report; Context, Culture, Care, Coordination
 Prioritise enforcement of those who produce and/or supply controlled drugs that
cause the greatest harm in our communities
 Progress reports
 Evaluation and learning
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How well does Lanarkshire Division interpret and analyse multiagency data?
 How is Lanarkshire Division helping to reduce the harm caused by controlled
substances in our communities?
 How effective is Lanarkshire Division in addressing the threat posed by those
who produce/supply controlled drugs? 
 What evaluation and learning has been taken from the multiagency plan? 
Objective: Support policing through proactive prevention
Activity: We will develop a prevention plan that addresses the issues that matter
most to our communities
Key milestones:
 Identification of criminal activity that has the most impact on our communities
 Work with Community Planning Partners to establish key tactics to mitigate the
risk
 Allocate strand leads to drive activity 
 Progress reports and impact analysis
 Continuous innovation and improvement
 Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
 How well does Lanarkshire Division identify criminality that impacts most on our
communities?
 How effective is Lanarkshire Division in preventing crime?
 What innovation tactics and improvements have been identified through the plan? 
53

Page 54

OFFICIAL 
OFFICIAL 
Activity: We will reduce death and serious injury on the road network in Lanarkshire
Key milestones:
 Intelligence led policing and proactive engagement with all road users
 Identification of hotspot locations and drivers who present the greatest risk to
road safety 
 Deliver multiagency activity in support of Lanarkshire Road Safety Governance
Board's four key pillars; prevention, engineering, engagement and enforcement
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How well does Lanarkshire Division engage with road users? 
 How effectively does Lanarkshire Division identify the key risks to road users? 
 How successful are police activities in improving road safety in Lanarkshire?
The needs of local communities are addressed through effective
service delivery
To create your Local Police Plan we have engaged and consulted with the public,
stakeholders, community representatives and partners including other service
providers to ensure we have a shared understanding of the local community and the
role of policing within it.
We will continue to improve the services we provide as society evolves, embedding
accessibility and inclusivity into all that we do.
We continue to be able to call upon additional operational support and specialist
services to assist with incidents and investigations, large planned and unplanned
events, and other situations where these resources are needed ensuring our focus
remains on the needs of the local community. 
Objective: Understand our communities and deliver the right mix of services to
meet their needs
Activity: We will design an operating model that optimises the availability of police
resources where and when they are needed by our local communities
Key milestones:
54

Page 55

OFFICIAL 
OFFICIAL
 Analyse current demand
 Review divisional police structure 
 Develop a target operating model
 Consult with internal stakeholders
 Implement new delivery model
 Evaluate benefits and challenges
Update expected: Y1-3, Q2 & Q4
Performance measures and insights: 
 How well does Lanarkshire Division understand demand and its existing resource
base?
 What insights were gained through engagement with stakeholders?
 How effectively is Lanarkshire Division in responding to the concerns of our
communities? 
 What benefits have the new operating model brought to the citizens and
communities of Lanarkshire? 
Objective: Support our communities through a blend of local and national
expertise
Activity: We will maximise the use of regional and national specialist policing
resources to support local officers in the investigation/prevention of crime and public
protection
Key milestones:
 Review efficiency of the process for securing regional and national policing
assets
 Develop an improved and more responsive local mechanism for requesting
national resources
 Publicise the value of that support
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How effective is the process to secure regional and national support for local
policing in Lanarkshire?
 What benefits has the support brought to Lanarkshire? 
55

Page 56

OFFICIAL 
OFFICIAL
Objective: Support the changing nature of communities
Activity: We will work in partnership to support the changing demographics in our
communities and protect our most vulnerable citizens
Key milestones:
 Establish current and projected demographics through open source and
Community Planning Partnership data
 Establish a multiagency referral process to police
 Introduce enhanced safety visits for our most vulnerable 
 Expand the police role in the safety of those seeking refuge or asylum
 Improve outcomes through integrated service delivery with Community Planning
Partners
Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
 How well does Lanarkshire Division understand the changing nature of the
communities it serves?
 How effectively does Lanarkshire Division assess and act upon receipt of
multiagency referrals?
 What impact have enhanced safety visits had on our most vulnerable citizens?
 How effectively does Lanarkshire Division support those at most risk of harm? 
The public, communities and partners are engaged, involved and
have confidence in policing
Our values are at the heart of everything we do.  Our human rights based approach
to policing along with ethical and privacy considerations are of the utmost importance
to the service we provide. The communities we serve should feel confident that we
will always police in a way that is fully underpinned by our values of fairness,
integrity, respect and human rights.
The safety and wellbeing of the people we serve are enhanced by providing services
that work efficiently. We will listen and seek to understand the changing needs of
diverse communities, bringing both professionalism and empathy to our interactions
making changes to our services when required. Engaging with people strengthens
relevance, responsiveness and accountability and builds trust. We will improve and
56

Page 57

OFFICIAL 
OFFICIAL
refocus our engagement activities where these are not reaching diverse communities
and are not representative of the society we serve. 
Objective: Embed the ethical and privacy considerations that are integral to
policing and protection into every aspect of the service 
Activity: Ensure a transparent, strong and consistent ethical oversight that maintains
public trust and confidence in policing
Key milestones:
 Identify areas that could impact on public trust and confidence through local
community engagement and the Your Police survey
 Enhance methods of communication to promote transparency and accountability   
 Tailor approach based on feedback and legitimate scrutiny
Update expected: Y1-3, Quarterly
Performance measures and insights:
 How does Lanarkshire Division identify areas of significant public concern?
 How effectively is Lanarkshire Division communicating the successes and
challenges of modern policing?
 How is Lanarkshire Division responding to legitimate public scrutiny? 
Objective: Protect the public and promote wellbeing across Scotland by
providing services that are relevant, accessible and effective
Activity: We will proactively engage with the public, communities and Community
Planning Partners on key considerations for policing, maintaining and enhancing
public trust and confidence in policing
Key milestones:
 Design a public and stakeholder engagement plan
 Deliver plan on a continuous improvement basis 
 Use feedback to inform police activity
 Evaluate engagement, delivery and effect
 Provide feedback on activity resulting from community engagement
Update expected: Y1-3, Q1 & Q3
Performance measures and insights: 
57

Page 58

OFFICIAL 
OFFICIAL
 What improvements to accessibility and engagement have been made as a result
of the plan?
 How is Lanarkshire Division measuring and improving public confidence and
satisfaction in our police service?
 What evaluation and learning has been taken from the action plan? 
Objective: Work with local groups and public, third sector and private sector 
organisations to support our communities
Activity: We will develop a collaborative approach to dealing with mental health
incidents, which addresses the displaced demand on policing and ensures
individuals are supported by the most appropriate service
Key milestones:
 Quantify demand displaced to police 
 Work with partners to align demand to the agency best placed to address the
issue
 Support Community Planning Partners to improve outcomes for high intensity
users of public services
Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
 How well does Lanarkshire Division understand and identify displaced demand?
 How well is Lanarkshire Division addressing displaced demand on policing
services?
 How effective is Lanarkshire Division in identifying and prioritising high intensity
users of public services?
Our people are supported through a proactive working
environment, enabling them to service the public
The safety and wellbeing of our officers and staff are at the heart of Police Scotland’s
commitments. The challenges for policing are significant and the part policing plays
in daily life will become ever more important as Society faces huge challenges.
Policing is also coming under increasing scrutiny and pressure in relation to our
actions.
58

Page 59

OFFICIAL 
OFFICIAL
We will create the environment for our staff to be able to work effectively and equip
them to make decisions, ensuring they are trusted and empowered to do so. 
Objective: Prioritise wellbeing and keep our people safe, well equipped and
protected
Activity: We will involve our officers and staff in the key decisions that have the
greatest impact on them with their safety being paramount
Key milestones:
 Enhance the visibility and accessibility of the Senior Leadership Team
 Design a local engagement plan to enhance situational awareness amongst
colleagues
 Implement a local suggestion scheme
 Enhance engagement with Staff Associations and Trades Unions
 Establish a local Your Safety Matters group
 Evaluation and learning
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How directly accessible are the Senior Leadership Team in Lanarkshire Division?
 How effective is Lanarkshire Division engaging with officers, staff and their
representatives?
 How is Lanarkshire Division using officer and staff input to shape future
developments, including safety at work?
 What evaluation and learning has been taken from these activities? 
Activity: We will enhance the wellbeing support for our officers and staff to improve
their physical and mental health
Key milestones:
 Collaborate with Community Planning Partners to identify best practice and
proven resources
 Implement a bespoke wellbeing action plan
 Ongoing evaluation
Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
59

Page 60

OFFICIAL 
OFFICIAL
 What benefits have been derived from the wellbeing action plan?
 How well does Lanarkshire Division manage absence and support those on
modified duties?
 What evaluation and learning has been taken from the action plan? 
Activity: We will consider options for a police estate in Lanarkshire that is fit for the
challenges of modern policing, which will also enhance wellbeing and morale
Key milestones:
 Condition survey of existing estate
 Identification of options for improvement 
 Roadmap and timeline of preferred option
 Implementation of estates transformation
Update expected: Y1-3, Q1 & 3
Performance measures and insights:
 What percentage of the Lanarkshire Division estate is in good (or better)
condition?
 What benefits to wellbeing and morale has the estates transformation brought? 
Objective: Support our people to be confident leaders, innovative, active
contributors and influencers
Activity: We will develop our current and future leaders, with the learning points
cascaded to all officers and staff
Key milestones:
 Develop forums for officers and staff to address key issues
 Publication of forum output
 Design and implement toolkits for newly promoted officers and staff
 Establish a divisional mentoring programme
 Evaluate effectiveness
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How well is Lanarkshire Division supporting current and future police leaders?
 How effective have the forums and mentoring programme been?
60

Page 61

OFFICIAL 
OFFICIAL
 How well does Lanarkshire Division cascade the learning outputs from the forums
to our officers and staff? 
Activity: We will maximise training opportunities, both internally and with partners, to
develop our people?
Key milestones:
 Support the implementation and local delivery of the national training needs
assessment
 Collaborate with Community Planning Partners on joint training opportunities
 Implement training pathways to upskill our people
 Tailor offering based on feedback and professional judgement
 Evaluate impact of training
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How does Lanarkshire Division identify training needs?
 How successful is Lanarkshire Division in developing our workforce?
 What is the impact of the training on service delivery?
 How accessible are training pathways in Lanarkshire Division? 
Objective: Support our people to identify with and demonstrate Police Scotland 
values and have a strong sense of belonging
Activity: We will develop local ‘Lanarkshire Leads’ values that not only champion
inclusivity, encapsulate who we are and provide clarity on what we expect from each
other but are entirely aligned to the existing Force values
Key milestones:
 Develop a holistic action plan that is aligned to the Policing Together strategy 
 Reinforce our values through communication and engagement
 Evaluation and learning
Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
 How effective is Lanarkshire Division in proactively promoting equality, diversity
and inclusion?
 How successful is Lanarkshire Division is demonstrating values based policing?
61

Page 62

OFFICIAL 
OFFICIAL
 What evaluation and learning has been taken from the action plan? 
Police Scotland is sustainable, adaptable and prepared for future
challenges
Ongoing political, technological, economic and societal changes as well as
unforeseeable emergencies on a local and global scale require the police service to
adapt and respond to future challenges in order to maximise the benefits of future
opportunities. This includes working to reduce the impact of our activity, estates and
fleet on the environment. Police Scotland aims to make a significant contribution to
the Scottish Government’s 2040 carbon neutral target and 2045 zero greenhouse
gas emissions target.
Everyone has a role to play in improving financial sustainability, making efficient use
of resources and eliminating waste to deliver best value. Procurement of and
demand for goods and services will remain under scrutiny, ensuring resources are
used in the most efficient way possible to meet the greatest need. 
Objective: Use innovative approaches to accelerate our capacity and capability
for effective service delivery
Activity: We will design and implement a local improvement plan to actively drive
performance, promote organisational learning and challenge ourselves to be better,
enabling us to provide the best possible service to our communities
Key milestones:
 Identify areas for development
 Design and implement an improvement plan
 Progress reports through Divisional Governance Board
 Ongoing evaluation
Update expected: Y1-3, Q1 & Q3
Performance measures and insights:
 How effective is Lanarkshire Division is assessing areas for improvement?
 How successful is Lanarkshire Division's improvement plan in enhancing service
provision? 
62

Page 63

OFFICIAL 
OFFICIAL
 What learning has been taken from the plan? 
Objective: Commit to making a positive impact through outstanding
environmental sustainability
Activity: We will work in collaboration with Community Planning Partners to develop
and implement sustainable public services.
Key milestones: 
 Contribute towards partnership environmental strategies
 Local implementation of national environmental, estates and fleet strategies
Update expected: Y1-3, Q2 & Q4
Performance measures and insights: How effective is Lanarkshire Division’s
collaboration with Community Planning Partners to deliver shared priorities? 
Objective: Support operational policing through the appropriate digital tools
and delivery of best value
Activity: Support the implementation of the digital data and ICT strategy, national
Core Operating System and Digital Evidence Sharing Capability
Key milestones: Support the development and local implementation of the national
Core Operating System, ensuring officers are able to use the system effectively
Update expected: Y1-3, Q2 & Q4
Performance measures and insights:
 What local training and awareness is available to support officers in using the
COS system? 
63

Page 64

OFFICIAL 
OFFICIAL
Governance and performance
Effective scrutiny and oversight are key to ensuring that policing retains the trust and
confidence of the communities of Scotland. We pride ourselves on transparency and
accountability and as such, have created comprehensive arrangements for the
governance of this plan and monitoring of our performance. 
The Police and Fire Reform (Scotland) Act 2012 provides the framework for scrutiny
of policing in Scotland. At a national level, the Chief Constable is held to account for
policing by the Scottish Police Authority (SPA) and a range of other external bodies,
including HMICS and the Scottish Parliament.
At a local level, the Local Police Commander for Lanarkshire is responsible for the
production of a Local Police Plan, which must be approved by both local authority
scrutiny committees; the North Lanarkshire Community Safety Partnership Forum
and the Safer South Lanarkshire Board. The local authority scrutiny committees
have a key role in assessing police performance and progress against the outcomes
and objectives detailed in the Local Police Plan. The Local Police Commander
presents a report to members of the North Lanarkshire and South Lanarkshire
committees on a quarterly basis and is subject to robust, transparent examination of
the local delivery of policing across Lanarkshire. 
Equality, diversity and inclusion
The work of Lanarkshire Division is underpinned by our commitment to equality,
diversity and inclusion, whether in our interactions with the communities we serve or
between our own officers and staff. Discrimination of any form has no place in
society and no place in policing. As the Chief Constable has said: ‘Providing
everyone with a fair, just and effective policing response is our moral responsibility
and legal duty. It is also an operational imperative.’
We are committed to developing and promoting best practice and our duties to
equality, diversity & inclusion can be found at: https://www.scotland.police.uk/about-
us/how-we-do-it/equality-and-diversity/ 
Policing Together, our Equality, Diversity and Inclusion strategy (2022-26), outlines
the action we are taking to champion equality and inclusion so that we tackle sexism
64

Page 65

OFFICIAL 
OFFICIAL
and misogyny and become an actively anti-racist organisation, it can be found at:
https://www.scotland.police.uk/about-us/how-we-do-it/strategic-planning/policing-
together-equality-diversity-and-inclusion-strategy/
The inequalities inherent within society and the needs and experiences of specific
communities are factors to which we must pay close attention and this plan was
subject to an Equalities and Human Rights Impact Assessment (EqHRIA) in
compliance with the Scottish Public Sector Equality Duty. 
Engaging with us
Meaningful and effective engagement involves genuine dialogue, respect, integrity,
transparency and accountability. It provides an opportunity for people to shape our
services and influence decisions. Insight from effective engagement helps identify
practical solutions and determine changes required to meet the needs of the
communities we serve. 
The officers and staff of Lanarkshire Division want to hear from you. 
Our local headquarters are at:
Police Scotland
Lanarkshire Division
Windmillhill Street
Motherwell
ML1 1RZ
For more detailed information on how to contact your Local Policing Team please
refer to the ‘Your Community’ section of our website at:
https://www.scotland.police.uk/your-community/lanarkshire/
As part of the development of this Local Police Plan we have undertaken a period of
engagement to allow the public and our partners to provide feedback regarding our
strategic direction. This feedback was captured and used to shape the final version
of this plan. Further information about this and our wider engagement can be found
in our consultation and engagement hub at: https://consult.scotland.police.uk/
65

Page 66

OFFICIAL 
OFFICIAL
If you have information about crime in your area and wish to provide it anonymously,
call CRIMESTOPPERS on 0800 555111.
Social Media
Lanarkshire Division has a number of active social media channels that provide a
range of information and insight into policing in your area. Our local channels can be
found at:
Twitter: @Lanarkshire_Pol
https://twitter.com/Lanarkshire_Pol
Facebook: @Lanarkshire Police Division
https://www.facebook.com/LanarkshirePoliceDivision/
Please note that our social media channels are not monitored 24/7 and should not
be used for reporting crime. Please dial 999 in an emergency, and 101 in a non-
emergency situation.
Inclusive and accessible engagement
We aim to embed accessibility and inclusivity into our services to make them work
for everyone. 
This Local Police Plan was subject to an Equality and Human Rights Impact
Assessment (EqHRIA). 
Service users who are deaf, deafened, hard of hearing or speech-impaired can
contact us via Text Relay on 18001 101 for non-emergency, or 18000 in an
emergency.
This Local Police Plan can be made available in various alternative formats. For
more information, please contact us via our online form:
https://www.scotland.police.uk/contact-us/.
Lanarkshire Division is committed to continuous improvement in all that we do. If you
have something to tell us about our service, please contact us at:
https://www.scotland.police.uk/contact-us/ 
66

Page 67

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 29 March 2023
Report by: Director, Health and Social Care    
Subject: Community Alert Alarm Service 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 outline the position presented to the South Lanarkshire Integration Joint Board
(IJB) in respect of the level of subsidy and weekly charge for the Community Alert
Alarm Service (CAAS) as part of its statutory obligation to set a balanced budget
for 2023/2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the recurrent and substantial pressure on adult and older people social
care budgets be noted;
(2) that the information provided in respect of the current level of subsidy and
charging for the CAAS, including the full costs of delivery of the service, the
increasing costs of delivering the service and the benchmarked position with
other comparable local authorities be noted;
(3) that a verbal update from officers in respect of any request made to the South
Lanarkshire Council (SLC) by the IJB at its meeting of 28 March 2023 in relation
to the level of subsidy and weekly charge for the CAAS be provided; and
(4) that a decision be made on the level of subsidy and weekly charge for the
CAAS.   
3. Background
3.1. Audit Scotland has highlighted that across Scotland:- 
 IJBs are facing unprecedented challenges as they seek to balance the impact of
COVID-19, the remobilization of services and rising demand.  This is against a
backdrop of financial and workforce pressures, uncertainty over future financial
settlements and social care reform
 there remains a significant overall and recurrent budget gap across all IJBs
 making recurring savings and delivering services differently is essential to
sustainability 
3.2. The South Lanarkshire IJB in conjunction with the Parties (SLC and NHS Lanarkshire)
requires to ensure that a balanced budget is in place. The IJB met on 28 March 2023
to set a balanced budget for 2023/2024 as per its statutory responsibilities. In setting
that balanced budget the IJB has to address a projected recurrent funding gap of
£8.900 million across delegated social care (adult and older people services) in
2023/2024. 
7
67

Page 68

3.3. The funding deficit for adult and older people’s social care in 2023/2024 is such that it
has been recommended to the IJB that all of the IJB’s uncommitted social care
reserves funding at 1 April 2023 (£5.777 million) be used as a non-recurring
contribution to securing financial balance in 2023/2024. 
3.4. In setting a balanced budget for 2023/2024 and to protect health and social care
provision, the IJB has had to consider further action that can be taken to close the
social care funding gap, specifically reducing the subsidy for the CAAS in 2023/2024
noting that the responsibility for deciding upon levels of charging for social care is a
responsibility of the local authority (as per the Public Bodies [Joint Working] [Scotland]
Act 2014).   
4. Community Alert Alarm Service 
4.1. The South Lanarkshire CAAS is currently available on request and there is no
assessment and review function or eligibility criteria to access the service.  Whilst a
number of the service users are actively known to Social Work Services, many people
opt to access this service on the basis that it offers peace of mind and a safety net to
the individual and their family. 
4.2. The response service provided by SLC is more enhanced when compared to the
“Family First” model of response service provided by some other local authorities
where contact is initially made with family members, where available, or a blue light
responder, if necessary.  The response provided by the current SLC service model is
based on Council staff as “First Responder” which adds considerably to the overall
costs of the service.   
4.3. The current annual cost (as at 2022/2023) of providing the CAAS is estimated to be
circa £3.700 million per annum with approximately 5,408 users receiving the service. 
Similar to other services, this cost base will increase in forthcoming years due to
inflation and other cost pressures. 
4.4. Demand on the service has grown significantly, further adding to the cost pressures.
Over the period 2015 to 2020, the number of calls received into the Alarm Receiving
Centre has increased by 95,629 from 240,444 to 336,073, an increase of 40%. 
4.5. The cost of the service is further increasing because of the necessity to move from
analogue to digital (A2D). The current analogue system will become obsolete by the
planned 2025 switch over to digital services by the UK Telecommunications industry.
This means that the current analogue CAAS requires to be migrated to a digital
solution.  The Council has previously approved capital funding of circa £2.750 million
in support of this, with the process of replacing all of the analogue equipment
commenced (and as reported in capital reports). The move from A2D is also
accompanied by an increase in recurring costs to the service: that is an additional cost
of circa £0.324 million per annum due to the costs of SIM cards and new equipment. 
4.6. As highlighted at 4.3, the current cost of the CAAS provided by SLC is approximately
£3.700 million per annum based upon 2022/2023 figures. The current charge for the
CAAS applied by SLC is £1.70 per week.  Referring to the Local Government
Benchmarking Family Group (LGBFG) comparator data, the SLC charge is the lowest
as highlighted in the table below:-  
68

Page 69

Local Authority Weekly Charge
Falkirk £4.45
South Ayrshire £4.41
Clackmannanshire £3.90
Renfrewshire £3.70
Dumfries and Galloway £3.60
North Lanarkshire Council (Not part of LGBFG) £3.40
West Lothian £3.20
Fife £2.80
South Lanarkshire £1.70 
Figures available are for the current year 2022/2023 and do not include expected cost
increases in 2023/2024 (inflation and A2D costs). 
4.7. It is anticipated that the charges across the LGBFG will likely increase in 2023/2024
given that other authorities are faced with the same cost pressures as the SLC service. 
4.8. SLC currently subsidises the CAAS to the amount of £3.200 million (86% of the actual
2022/2023 revenue costs of providing the service). If service users were charged at a
level that enabled full cost-recovery of the service, based on 2022/2023 costs, this
would equate to a weekly charge of £13.13. 
4.9. As above, the recurrent revenue cost of the CAAS will further increase as a result of
the switch from A2D (an additional £0.324 million per annum); and with inflation at a
rate of 10.1%, an additional £0.400 million in 2023/2024.  The cost of the CAAS is,
therefore, projected to total £4.400 million in 2023/2024.  Based on the current charge
of £1.70 per week, the net cost of subsidy by SLC would increase to approximately
£3.900 million (an 89% subsidy for 2023/2024).  Full cost recovery would require a
charge of £15.60 per week per service user. 
4.10. The South Lanarkshire IJB, as set out in the South Lanarkshire Integration Scheme,
has a duty to set a balanced budget, similar to that held by elected members in relation
to setting a balanced budget for the Council. In order to set a balanced budget for
2023/2024, the IJB has had to confirm actions to address a projected recurrent funding
gap of £8.900 million across delegated social care (adult and older people services)
in 2023/2024 and as considered at its meeting of 28 March 2023. 
4.11. Given that CAAS is currently available on request and there is no assessment and
review function or eligibility criteria to access the service, consideration was given to
the following options as part of the measures to address the recurrent social care
funding gap of £8.900 million:-  
Ref Option Subsidy 
Rate
%
Weekly
Charge
£
Additional
Income
£m
1 No change  89% 1.70 Nil
2 2022/2023 Family group
benchmark average 
76% 3.72 0.600
3 Family group benchmark average
plus 10% (contribution to
inflation/A2D) 
74% 4.10 0.700
69

Page 70

Ref Option Subsidy 
Rate
%
Weekly
Charge
£
Additional
Income
£m
4 As per option 3 plus full recovery of
A2D cost 
66% 5.25 1.000
5 Recognise ‘gold standard’ service
– additional £0.45 premium 
63% 5.70 1.100 
4.12. The IJB Financial Plan for 2023/2024 considered at the IJB’s meeting of 28 March
2023, includes a recommendation that the IJB request of SLC a reduction of the
subsidy for CAAS so as to bring the SLC rate more in line with the benchmarking
family rate (as 2022/2023); reflect the increase in recurrent costs due to inflation and
the switch to A2D; and to contribute £0.700 million recurrently to addressing the
projected recurrent social care funding gap of £8.900 million. Due to the sequence of
meetings, a verbal update on the decision of the IJB and its request to the Council’s
Executive Committee will be provided at today’s meeting. 
4.13. As highlighted at 3.3, the funding deficit for adult and older people’s social care in
2023/2024 is such that it has been recommended to the IJB that all of the IJB’s
uncommitted social care reserves funding at 1 April 2023 (£5.777 million) be used as
a non-recurring contribution to securing financial balance in 2023/2024. 
4.14. If the additional income is not recoverable in full or in part in 2023/2024 for CAAS, the
IJB will require to identify an alternative funding option to ensure financial balance in
2023/2024. An alternative funding solution is likely to involve reductions in levels of
social care service delivery. 
5. Next Steps
5.1. Any changes approved would be implemented effective from the beginning of the new
financial year 2023/2024. 
5.2. Arrangements would be put in place to support people who may be concerned about
the increase in the charge. This would include all service users and carers being
contacted individually by letter to inform them of changes to the annual service
charges.  A contact number would also be provided should the individual require
additional information or support.   
5.3. Furthermore, in accordance with CoSLA guidance, SLC maximises the income of all
service users who are liable to make a contribution towards the cost of a service. 
Anyone who receives a CAAS would, therefore, be offered a financial assessment to
ensure that their income is maximised.  Experienced and skilled staff would also be
available to assess the individual circumstances of anyone concerned about the
proposed increase in the charge and intending to return the alarm.  Assurance would
be sought that the individual has the ability to seek assistance and support
appropriately if the alarm is returned. 
6. Employee Implications
6.1. There are no employee implications as a result of this report. 
7. Financial Implications
7.1. The financial implications are detailed at section 4.  
70

Page 71

8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
9. Other Implications
9.1. There are no other implications in terms of risk and sustainability as a result of this
report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. There has been a benchmarking exercise undertaken with other local authorities and
similar service providers to compare prices in relation to service delivery.  This is
summarised in 4.6 and indicates that current SLC charges are substantially lower that
the LGBF Family Group average. 
10.2. An Equalities Impact Assessment has been conducted in relation in respect of
reducing the subsidy for and increasing the charging for CAAS. 
10.3. Depending on the outcome taken by SLC, service users and carers will be contacted
individually in advance of any changes to their annual charges, with the specific aim
of providing additional information and contact details in the event that they require
further information or support.   
Soumen Sengupta
Director, Health and Social Care   
8 March 2023 
Link(s) to Council Values/Priorities/Outcomes
 People live the healthiest lives possible
 Accountable, effective, efficient and transparent
 Focused on people and their needs 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Cunningham, Head of Commissioning and Performance
Ext: 01698 453704
Email:  craig.cunningham@lanarkshire.scot.nhs.uk 
71

Page 72

72