Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 03 December 2024 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 11 December 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Lynsey Hamilton, Susan Kerr, Eileen Logan,
Katy Loudon, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley McDonald, Davie
McLachlan, Richard Nelson, Norman Rae, Mo Razzaq, Kirsten Robb, John Ross, David Shearer,
Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin Hose,
Cal Johnston-Dempsey, Ross Lambie, Hugh Macdonald, Elaine McDougall, Mark McGeever,
Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 13 November 2024
submitted for approval as a correct record.  (Copy attached) 
5 - 18 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 8 - 1 April 2024 to 1 November 2024
Report dated 13 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
19 - 24 
4 Capital Budget 2024/2025 and Monitoring for Period 8 - 1 April 2024 to 1
November 2024
Report dated 19 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
25 - 32 
5 Update to Funding
Report dated 15 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
33 - 36 
Item(s) for Decision 
6 Glasgow City Region City Deal – Centre West, East Kilbride Outline
Business Case
Report dated 26 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
37 - 58 
7 Outcome of Statutory Polling Scheme Review
Report dated 18 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
59 - 76 
8 Council Motion - Keep the Beat Alive
Report dated 27 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
77 - 88 
Item(s) for Noting 
9 2025/2026 Budget Update - COSLA Lobbying Document
Report dated 22 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
89 - 92 
10  Marmot Place for South Lanarkshire
Report dated 24 November 2024 by the Chief Executive.  (Copy attached) 
93 - 100 
11  National Care Service – Update
Report dated 25 November 2024 by the Director, Health and Social Care. 
(Copy attached) 
101 - 104
2

Page 3

12  Commercial Opportunities
Report dated 14 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
105 - 110 
13  Cost of Living Support
Report dated 14 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
111 - 118 
14  Artificial Intelligence and the Council
Report dated 30 August 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
119 - 132 
15  Developing an Age Friendly South Lanarkshire ‘A great place to grow
older’
Report dated 1 October 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
133 - 136 
16  Programme for Government 2024/2025
Report dated 24 October 2024 by the Chief Executive.  (Copy attached) 
137 - 186 
Urgent Business 
17  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 13 November 2024 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Maureen Devlin,
Councillor Gladys Ferguson-Miller, Councillor Elise Frame, Councillor Lynsey Hamilton, Councillor
Celine Handibode (substitute for Councillor Susan Kerr), Councillor Graeme Horne (substitute for
Councillor Ian McAllan), Councillor Martin Hose (substitute for Councillor Kenny McCreary),
Councillor Cal Johnston-Dempsey (substitute for Councillor David Shearer), Councillor Eileen Logan,
Councillor Katy Loudon, Councillor Catherine McClymont, Councillor Lesley McDonald, Councillor
Davie McLachlan, Councillor Richard Nelson, Councillor Norman Rae, Councillor Mo Razzaq,
Councillor Kirsten Robb, Councillor John Ross, Councillor Graham Scott (substitute for Councillor
Margaret B Walker) 
Councillors' Apologies:
Councillor Susan Kerr, Councillor Ian McAllan, Councillor Kenny McCreary, Councillor David Shearer,
Councillor Margaret B Walker 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; J Kerr, Community Engagement Manager; T Little, Head of
Communications and Strategy
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development; S Laird,
Engineering Manager; K McCafferty, Carbon Management Officer; C Park, Head of Roads,
Transportation and Fleet Services
Education Resources
A Donaldson, Head of Education (Inclusion); L Sherry, Head of Education (Support Service and
School Estate)
Finance and Corporate Resources
J Taylor, Executive Director; C Fergusson, Head of Finance (Transactions); M Husband, Head of IT
Services; K McLeod, Administration Assistant; M Milne, Head of Personnel Services; T Slater,
Administration Adviser; I Strachan, Head of Administration and Legal Services
Housing and Technical Resources
S Gibson, Executive Director; C Jardine, Head of Property Services
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care; L Purdie, Head of Children and Justice Services 
1 Declaration of Interests 
No interests were declared. 
Councillor Razzaq made a transparency statement at item 10 of the agenda – Transformation
Fund – Phase 1 update and Phase 2 Proposals, as he was a member of the South Lanarkshire
Leisure and Culture Board. 
2
5

Page 6

2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 2 October 2024 were submitted
for approval as a correct record. 
In relation to item 10 – Council’s Approach to Impact Assessments – Councillor Robb requested
that bullet point 3 be extended to read ‘mitigating travel implications, with officers to consider the
inclusion of provision in the planned review of the Employee Travel Plan for mitigations to carbon
neutralise those flights which were deemed necessary’.  This was agreed. 
The Committee decided: that the minutes be approved as a correct record, subject to
the agreed amendment to item 10. 
3 Revenue Budget Monitoring for Period 7 - 1 April 2024 to 4 October 2024 
A report dated 14 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing a forecast for the year to 31 March 2025 for the Council’s General Fund
Revenue Account and Housing Revenue Account. 
The year-end forecast to 31 March 2025 for both the Council’s General Fund Revenue Account
and Housing Revenue Account was a projected breakeven position as at 4 October 2024.  Details
were provided in the appendices to the report. 
Information was provided on the following key budget areas:- 
 teacher numbers
 employer’s pension contribution increase (teachers) 
The early Outturn position for 2024/2025 was also provided. 
The Committee decided: 
(1) that the projected break-even position on the General Fund Revenue Account for
2024/2025, and the actual spend as at 4 October 2024, as detailed in section 4 and Appendix
1 of the report, be noted; 
(2) that the position on the 2024/2025 Early Outturn, as detailed in sections 4.7 to 4.10 of the
report, be noted; and 
(3) that the projected break-even position on the Housing Revenue Account for 2024/2025, and
the actual spend as at 4 October 2024, as detailed in section 5 and Appendix 2 of the report,
be noted. 
[Reference: Minutes of 2 October 2024 (Paragraph 3)] 
Councillor Chalmers left the meeting during consideration of the above item of business 
4 Capital Budget 2024/2025 and Monitoring for Period 7 - 1 April 2024 to 4 October
2024 
A report dated 23 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the progress of the General Fund Capital Programme and
Housing Capital Programme for the period 1 April to 4 October 2024.  
6

Page 7

The revised programme for the General Fund for 2024/2025 was £76.792 million which included
previous adjustments approved by this Committee.  The programme included further proposed
adjustments, as outlined in the report and detailed in Appendix 1.  To reflect accounting
regulations, it was also proposed that £1.000 million be transferred to the Revenue Budget for the
Private Housing Scheme of Assistance project. 
The overall programme was summarised in Appendix 2 to the report, with the funding available to
support the programme detailed in Appendix 3. 
Appendix 3 also showed a forecast for the financial year of £76.792 million.  Actual spend incurred
as at 4 October 2024 totalled £17.581 million.  Actual funding received up to 4 October 2024 was
£45.336 million.  This was also detailed in Appendix 3.  Relevant officers would continue to monitor
the generation of all income. 
The revised Housing Capital Programme for 2024/2025 amounted to £77.248 million. 
Programmed funding for the year also totalled £77.248 million. The funding sources were detailed
in Appendix 4 to the report.  Budget for the period amounted to £22.439 million and, as at 4
October 2024, £22.439 million had been spent. 
The forecast for 2024/2025 identified an outturn of £72.106 million.  The reason for this related to
Affordable Housing Supply Programme funding, as outlined in the report. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in appendices 1 to 3
of the report and the Housing Capital Programme, as detailed in Appendix 4 of the report,
as at 4 October 2024, be noted; 
(2) that the adjustments to the General Fund programme, as detailed at Appendix 1 of the
report, be approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 2 October 2024 (Paragraph 4)] 
5 Update to Funding 
A report dated 18 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on additional funding, totalling £5.839 million, which had been made available to
the Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2024/2025 
(£m) 
Housing and Technical 0.218 
Total 0.218  
7

Page 8

Capital Funding 
Resource 2024/2025 
(£m) 
Education 0.332 
Housing and Technical 5.289 
Total 5.621 
Overall Total 5.839 
The Committee decided: that the report be noted. 
[Reference: Minutes of 2 October 2024 (Paragraph 5)] 
6 Employee Workforce Monitoring Information - April to September 2024 Summary 
A report dated 23 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on workforce monitoring information relating to the Council for the period April to
September 2024 as follows:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 employee development
 labour turnover/analysis of leavers and exit interviews
 recruitment monitoring
 Staffing Watch as at 14 September 2024 
Following a member’s questions in relation to the black/ethnic minority recruitment figures, it was
noted that the newly formed Employee, Equalities, Diversity and Inclusion Forum would look
further into this area and the Head of Personnel Services undertook to meet with the member to
look at the figures. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 22 November 2023 (Paragraph 6)] 
Councillor Chalmers joined the meeting during consideration of the above item of business 
7 Community Plan Quarter 4 Progress Report 2023/2024 and Annual Outcomes
Improvement Report 
A report dated 23 October 2024 by the Chief Executive was submitted on progress against the
outcomes within the Community Plan 2023/2024 as at 31 March 2024. 
The South Lanarkshire Community Plan, approved in October 2017, set out the priorities and
outcomes for the Community Planning Partnership over a 10-year period from 2017 to 2027. 
Subsequently, a revised Community Plan had been approved by the Partnership Board on 22
June 2022 which covered the period 2022 to 2032.  In order to meet the requirement to publish a
Local Outcomes Improvement Plan, as required by the Community Empowerment (Scotland) Act
2015, it had been agreed that an Annual Outcomes Improvement report would be published
alongside the Community Plan Progress Report.  
8

Page 9

The Quarter 4 progress report, attached as Appendix 1 to the report, summarised progress against
the Community Plan to March 2024.  The Annual Outcomes Improvement Report, which detailed
the progress of the South Lanarkshire Community Planning Partnership during 2023/2024, was
attached as Appendix 2 to the report. 
The report provided a summary of progress against the outcomes of the Community Plan using a
traffic light system of red/amber/green.  A blue status had also been included which indicated that
the action to achieve change had been completed.  Of the 76 measures contained within the Plan,
none had been completed, 67 were judged to be on course to achieve the targets set (green), 7
were judged to be slightly off target (amber) and 2 were judged to be considerably off target (red). 
There were no measures which would be reported later. 
Details were provided on:- 
 the 7 amber and 2 red measures, together with explanatory commentary
 key achievements for 2023/2024 in relation to priority themes 
The Committee decided: 
(1) that the progress made to date against the outcomes within the Community Plan, as detailed
in Appendix 1 of the report, be noted; and 
(2) that the content of the statutory Annual Outcomes Improvement Report, as detailed in
Appendix 2 of the report, be noted. 
[Reference: Minutes of 22 November 2023 (Paragraph 7)] 
8 2025/2026 Revenue Budget Gap and Savings 
A report dated 31 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the budget gap and proposed savings for 2025/2026. 
Information was provided on:- 
 the following key budget areas:- 
 the 2024/2025 pay award and the proposal to set aside Consequentials funding of
£3.600 million to contribute to the 2025/2026 pay award costs
 the potential reduction of the budget gap due to reduced utilities costs
 better than anticipated recovery of Council Tax income
 proposed savings as a result of the Transformational Change Programme
 the position in relation to teacher numbers
 the cross-cutting review of the Loans Fund and Service Concessions
 the 3-year budget position 2025/2026 to 2027/2028
 the next steps in the budget process, including public consultation 
The Executive Director (Finance and Corporate Resources) responded to members’ questions in
relation to the:- 
 terminology in the report where certain recommendations were for consideration
 impact of extending loan periods and whether there were any guidelines in relation to level
of debt or interest payments 
The Chair advised that the Cross-Party Budget Working Group would be reconvened.  
9

Page 10

The Committee decided: 
(1) that the update on key budget areas, as detailed in section 4 of the report, be noted; 
(2) that £3.600 million Consequentials funding be set aside to contribute to the 2025/2026 pay
award, as detailed in section 4.2 of the report; 
(3) that the 2025/2026 budget reductions in utilities and Council Tax, as detailed in section 4.8
and Table 1 of the report, be used to reduce the budget gap; 
(4) that the proposed savings included in Appendix 1 be considered; 
(5) that the position regarding additional teachers, as detailed in section 5.4 of the report, be
noted; 
(6) that the Loans Fund Review proposal to remove voluntary repayments, as summarised in
sections 6.3 to 6.8 and detailed in Appendix 4 of the report, be considered; 
(7) that the use of the resultant savings from the Loans Fund Review, as detailed at section 6.7
and Table 4 of the report, to reduce the Budget Gap, be considered; 
(8) that the Service Concessions (IFRS 16) review savings, as detailed at section 6.11 and
Table 5 of the report, be noted; 
(9) that the use of Loans Fund Review underspends to support the Budget Strategy from
2027/2028 to 2029/2030, as proposed in section 6.16 and Table 8 of the report, be
considered; 
(10) that the revised 3-year budget gap across the period 2025/2026 to 2027/2028, as detailed
in section 7 and Table 9 of the report, be noted; and 
(11) that the risks detailed in the Other Implications section of the report be noted. 
[Reference: Minutes of 26 June 2024 (Paragraph 9)] 
9 Glasgow City Region City Deal - Stewartfield Way Capacity Enhancement Project:
Outline Business Case 
A report dated 23 October 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on the Outline Business Case (OBC) for the Stewartfield Way Capacity
Enhancement project. 
The Council was one of 8 local authorities who, with the UK and Scottish Governments, were
signatories to the £1.13 billion Glasgow City Region City Deal.  The City Deal was made up of 20
key infrastructure projects that were intended to drive economic and inclusive growth across the
Glasgow City Region area. 
Information was provided on:- 
 the governance arrangements for the City Deal initiative and the approval process for OBCs
 the current position in relation to the project which, following approval by this Committee at
its meeting on 8 May 2024, had been rescoped to include town centre interventions
 the realignment of the project budget
 the specific improvements the project was expected to deliver and the delivery timeline
 the project cost and funding share between City Deal funding and Council funding  
10

Page 11

If approved, a Full Business Case for the project would be developed for submission to a future
meeting of the Committee. 
Officers responded to members’ questions in relation to:- 
 the provision of information on the climate impact of certain aspects of the project, without
which any decision could be at conflict with legal duties and the Council’s Climate Action
Plan in relation to carbon emissions
 the rationale and use of funds for the new junction at the Kingsgate retail area 
The Committee decided: 
(1) that the Outline Business Case for the Stewartfield Way Capacity Enhancement project be
approved; 
(2) that the proposed next steps in developing the project be approved; 
(3) that grant funding be sought in accordance with the City Deal Grant Distribution Process
outlined in the Assurance Framework in relation to preliminary costs; and 
(4) that the relevant Full Business Cases for the project and associated subprojects be
developed for future presentation to the Executive Committee and City Region Cabinet. 
[Reference: Minutes of 8 May 2024 (Paragraph 7) and 10 March 2021 (Paragraph 10)] 
Councillor Robb, as the mover of an amendment which failed to find a seconder, asked that her
dissent be recorded 
10 Transformation Fund – Phase 1 Update and Phase 2 Proposals 
A joint report dated 23 October 2024 by the Executive Directors (Housing and Technical
Resources) and (Community and Enterprise Resources) was submitted providing an update on
the Transformation Fund. 
At its meeting on 22 February 2023, South Lanarkshire Council approved funding for capital
investment to help modernise the leisure and culture estate, optimise the use of assets and assist
in the transition towards Net Zero.  A £13 million Transformation Fund had been included in the
Council’s financial plans in the capital programme.  Phase 1 was approved by this Committee at
its meeting on 8 May 2024. 
Information was provided:- 
 on the progress of investment in properties identified in Phase 1 of the Transformation Fund
Programme, as detailed in Appendix 1 to the report
 requesting approval for Phase 2 investment proposals, as outlined in Appendix 2 to the
report
 on the oversight arrangement in place which included a cross-Service working group to
monitor progress 
Officers responded to members’ questions in relation to:- 
 increasing energy efficiency and reducing energy costs
 support for rural halls.  The Chief Executive advised of other pieces of work that were being
undertaken and the potential to use the unallocated funding where necessary, and
undertook to take a closer look at the halls and specific work identified
 how members could highlight areas of concern in their ward
 the scope of delegated authority outlined at recommendation (4)  
11

Page 12

It was, therefore, proposed that:- 
 delegated authority be granted to the Executive Director (Housing and Technical
Resources), Executive Director (Community and Enterprise Resources and Executive
Director (Finance and Corporate Resources) to (i) amend budget allocation for each project
and/or (ii) amend project scope as required when final costs were known, where that
amendment to the project scope was not material in terms of the context of the project or
was of a technical nature, ensuring the overall budget was not exceeded
 should there be any available budget following the delivery of all agreed projects within
Phase 1 and 2, delegated authority be granted to the Executive Director (Housing and
Technical Resources) and Executive Director (Community and Enterprise Resources) to
progress with further priority projects, as identified at Section 6.2 of the report 
The Committee decided: 
(1) that the progress in relation to Phase 1 of investment from the Transformation Fund, as
detailed in Appendix 1, be noted; 
(2) that the proposals for Phase 2, as set out in Section 5 and Appendix 2, be approved; 
(3) that the arrangements for monitoring the programme and budget, as set out in Section 6, be
approved; 
(4) that delegated authority be granted to the Executive Director (Housing and Technical
Resources), Executive Director (Community and Enterprise Resources and Executive
Director (Finance and Corporate Resources) to (i)  amend budget allocation for each project
and/or (ii) amend project scope as required when final costs are known, where that
amendment to the project scope was not material in terms of the context of the project or
was of a technical nature, ensuring the overall budget was not exceeded; and 
(5) that, should there be any available budget following the delivery of all agreed projects within
Phase 1 and 2, delegated authority be granted to the Executive Director (Housing and
Technical Resources) and Executive Director (Community and Enterprise Resources) to
progress with further priority projects as identified at Section 6.2. 
Councillor Cooper left the meeting during consideration of the above item of business 
11 Public Bodies Climate Change Duties - Annual Report 2023/2024 
A report dated 24 October 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on the Council’s annual Public Bodies Climate Change Duties Compliance report
for 2023/2024, as required under the Climate Change (Scotland) Act 2009. 
The report contained the following 6 sections:- 
 profile of reporting body
 governance, management and strategy
 emissions, targets and projects
 adaptation
 procurement
 validation 
The purpose of each of those areas was summarised in the report. 
Highlights from the 2023/2024 annual report were provided in the Executive Director’s report and
the annual report itself was attached as Appendix 1 to the report.  If approved, the report would
be submitted to the Scottish Government by the required date of 30 November 2024.  
12

Page 13

Due to the timing of committee meetings, it was not possible to submit the full report to the Climate
Change and Sustainability Committee for approval prior to the Scottish Government submission
date and it was agreed that the report be submitted to this meeting of the Executive Committee
for approval and, subsequently, to the Climate Change and Sustainability Committee on 18
December 2024 for noting. 
The Committee decided: 
(1) that the Council’s Public Bodies Climate Change Duties Compliance report for 2023/2024
be approved for submission to the Scottish Government; and 
(2) that the Council’s Public Bodies Climate Change Duties Compliance report be submitted to
the Climate Change and Sustainability Committee on 18 December 2024 for noting. 
[Reference: Minutes of the Climate Change and Sustainability Committee of 9 October 2024
(Paragraph 4) and 29 November 2023 (Paragraph 4)] 
12 Recommendations Referred by Resource Committees 
A report dated 30 October 2024 by the Chief Executive was submitted on recommendations
referred to this Committee by the Education Resources Committee of 29 October 2024 and the
Finance and Corporate Resources Committee of 30 October 2024. 
The recommendation of the Education Resources Committee was that the Community Learning
and Development 3-Year Strategic Plan 2024 to 2027 be approved. 
The recommendations of the Finance and Corporate Resources Committee were as follows:- 
 that the Treasury Management Activity Report for 2023/2024 and the 2023/2024 Treasury
Management and Prudential Code Indicators be noted
 that the Council’s Annual Investment Report for 2023/2024 be endorsed and referred to the
Council for formal approval in line with The Local Government Investments (Scotland)
Regulations 2010 
The Committee decided: 
(1) that the Community Learning and Development 3-Year Strategic Plan 2024 to 2027 be
approved; 
(2) that the Treasury Management Activity Report for 2023/2024 and the 2023/2024 Treasury
Management and Prudential Code Indicators be noted; and 
(3) that the Annual Investment Report 2023/2024 be endorsed. 
The Committee recommended
to the Council:
that the Annual Investment Report 2023/2024 be approved. 
[Reference: Minutes of the Education Resources Committee of 29 October 2024 (Paragraph 6)
and Minutes of the Finance and Corporate Resources Committee of 30 October 2024
(Paragraph 8)] 
13

Page 14

13 Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019 – Report
Consultation 
A joint report dated 23 October 2024 by the Executive Directors (Finance and Corporate
Resources) and (Housing and Technical Resources) was submitted on the proposed response to
the Scottish Government consultation to support the publication of the first 3-year periodic report
on reducing fuel poverty rates. 
The Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019 set ambitious targets for
the significant reduction of fuel poverty rates by 2040 and established reporting requirements for
the publication of 3-year periodic reports by the Scottish Government.  The first report was due to
be laid in the Scottish Parliament by the end of the 2024/2025 financial year.  Local authorities
were required to formally engage as part of the statutory process. 
The Scottish Government had invited views and feedback from a local authority perspective on
the relevant provisions of the Act, Part 2(a) and (b), as set out in Appendix 1 to the report. 
Questions for consideration and the proposed responses were provided in Appendix 2 to the
report. 
Responses had been due by 8 November 2024, however, the Scottish Government had granted
an extension to 13 November 2024 to allow this Committee to consider the responses. 
Officers responded to members’ questions in relation to:- 
 the impact of the changes to the winter fuel allowance
 the cost of air sourced heat pumps
 the inclusion of a reference to the role of the Citizens’ Advice Bureau in the response 
The Committee decided: 
(1) that the responses, as detailed in Appendix 2 to the report, subject to the inclusion of a
reference to the role of the Citizens’ Advice Bureau, be approved for submission to the
Scottish Government; and 
(2) to agree that the response be published as part of the Scottish Government process. 
In terms of Standing Order No 14, the Chair adjourned the meeting following this item of business at
11.57am and reconvened at 12.07pm 
14 Response to Consultation on Proposal to Allow Proxy Voting by Councillors 
A report dated 14 October 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the proposed response to the Scottish Government consultation on a proposal
to allow proxy voting by councillors. 
The Scottish Government had opened a consultation on proposals to allow proxy voting by
councillors with a closing date of 28 November 2024.  The consultation advised that concerns had
been raised in relation to the absence of this provision for councillors and requested views on
introducing such a provision, noting that there might be other options available and the potential
difficulties with smaller councils.  The Scottish Government had provided proposed criteria for
inclusion within any guidance that would be produced. 
Having assessed the proposal, officers could see the benefit of some form of proxy voting and a
proposed response to the consultation was provided at Appendix 1 to the report.  
14

Page 15

The Committee decided: 
(1) that the contents of the report be noted; and 
(2) that the submission of the response by the Council to the consultation, as attached at
Appendix 1 to the report, be approved. 
15 South Lanarkshire’s Children’s Services Plan 2023 to 2026 - Annual Report of
Progress for 2023/2024 
A joint report dated 9 October 2024 by the Director, Health and Social Care and Executive Director
(Education Resources) was submitted on the Annual Progress Report 2023/2024 for South
Lanarkshire’s Children’s Services Plan 2023 to 2026. 
The Children and Young People (Scotland) Act 2014 required local authorities and health boards
to prepare and publish:- 
 a Children’s Services Plan covering the period April 2017 to March 2020 and then in a
continuing 3-year cycle
 a Children’s Rights Report by March 2020 and then in a continuing 3-year cycle 
The Annual Progress Report 2023/2024 for South Lanarkshire’s Children’s Services Plan 2023 to
2026 was attached as Appendix 1 to the report. 
The Committee decided: that the Annual Progress Report 2023/2024 for South
Lanarkshire’s Children’s Services Plan 2023 to 2026 be
noted. 
16 Local Child Poverty Action Report 2023/2024 
A report dated 23 October 2024 by the Executive Director (Education Resources) was submitted
on the Local Child Poverty Action Report (LCPAR) 2023/2024. 
The Child Poverty (Scotland) Act 2017 required local authorities and health boards to prepare a
LCPAR as soon as was reasonably practicable after the end of each reporting year.  The LCPAR
for 2023/2024 was attached as Appendix 1 to the report. 
The Committee decided: that the Local Child Poverty Action Report 2023/2024 be
noted. 
17 Chief Social Work Officer Annual Report 2023/2024 
A report dated 21 October 2024 by the Director, Health and Social Care was submitted on the
Chief Social Work Officer (CSWO) Annual Report 2023/2024. 
There was a statutory requirement for all local authorities to appoint a professionally qualified
CSWO who must be registered with the Scottish Social Services Council (SSSC). 
The role of the CSWO was to provide professional advice and guidance to local authorities,
elected members and officers in the provision of social work services.  The CSWO also had
responsibility for overall performance improvements and the identification and management of
corporate risk insofar as those related to social work services.  
15

Page 16

The CSWO was required to prepare an annual report of activity, which followed a standardised
reporting framework, for submission to the Chief Social Work Advisor for Scotland. 
Information was provided on the content of the CSWO’s Annual Report 2023/2024, attached as
an appendix to the report. 
The Committee decided: that the Chief Social Work Officer Annual Report 2023/2024
be noted. 
[Reference: Minutes of the Social Work Resources Committee of 6 March 2024 (Paragraph 10)] 
18 South Lanarkshire Integration Joint Board Annual Performance Report 2023/2024 
A report dated 25 September 2024 by the Director, Health and Social Care was submitted on the
South Lanarkshire Integration Joint Board (IJB) Annual Performance Report (APR) 2023/2024. 
The Public Bodies (Joint Working) (Scotland) Act 2014 placed a duty on IJBs to prepare and
publish APRs. 
The APR aimed to ensure that performance was open and accountable, whilst providing an overall
assessment of performance in relation to planning and carrying out integration functions. 
Guidance issued by the Scottish Government had recommended that the following areas be
included within the report:- 
 a summary of progress against the 9 national health outcomes using, as a minimum, the 23
core national performance indicators
 financial performance and Best Value 
As with previous years, the APR was aligned to reporting progress against the intentions outlined
in the Strategic Commissioning Plan (SCP) and for this APR, would cover the second year of the
2022 to 2025 Strategic Commissioning Plan. 
The Committee decided: that the report be noted. 
19 Urgent Business 
There were no items of urgent business. 
20 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act. 
16

Page 17

21 Heads of Terms Agreement for the Transfer of Centre West, East Kilbride to South
Lanarkshire Council 
A report dated 23 October 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on the Heads of Terms proposal for the transfer of Centre West, East Kilbride to
South Lanarkshire Council. 
Following endorsement by the Community and Enterprise Resources Committee at its meeting
on 23 April 2024 and approval by this Committee on 8 May 2024, the Heads of Terms proposal
for the transfer of Centre West, East Kilbride to South Lanarkshire Council had been developed,
as summarised in the report.  This included the transfer of 2 parcels of land, forming part of the
public realm adjacent to the bus station, to Sapphire 15 s.a.r. l. (in administration), or assignees
or nominees for no consideration. 
The Committee decided: 
(1) that the Heads of Terms, as summarised in the report, be approved; 
(2) that the Council accept a surrender of leasehold interest in Centre West, East Kilbride from
the current tenant, Sapphire 15 s.a.r.l. (in administration), on the terms set out in the Heads
of Terms as at 30 December 2025, or such other date as might be agreed; 
(3) that the Council transfer ownership of the 2 parcels of land, forming part of the public realm
adjacent to the bus station, to Sapphire 15 s.a.r.l. (in administration), or assignees or
nominees, for no consideration; and 
(4) that the Executive Director (Community and Enterprise Resources), in consultation with the
Executive Director (Housing and Technical Resources) and the Head of Administration and
Legal Services, be delegated authority to conclude all matters, including contractual and
other documentation pertaining to the surrender of the lease of Centre West and transfer of
ownership of ancillary land further to the proposed Heads of Terms and on such terms which
were in the best interests of the Council. 
[Reference: Minutes of 8 May 2024 (Paragraph 7) and the Minutes of the Community and
Enterprise Resources Committee of 23 April 2024 (Paragraph 9)] 
17

Page 18

18

Page 19

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 8 - 1 April 2024
to 1 November 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2024 to 1 November 2024
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the current forecast on the General Fund Revenue Account for 2024/2025
(section 4.1), and the actual spend as at 1 November 2024 (section 4 and
Appendix 1), be noted; and
(2) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 1 November 2024 (section 5 and
Appendix 2 of the report), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2024/2025 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section 5). 
It will also provide the actual spend as at 1 November 2024. 
4. General Services 2024/2025 Projected Outturn as at 1 November 2024
4.1. As at 1 November 2024, the projected outturn on the General Services budget for
2024/2025 is an underspend of £8.9 million.  This is detailed in sections 4.2 and 4.3. 
4.2. 2024/2025 Early Outturn:  As noted in the recent Executive Committee report on
the 2025/2026 Revenue Budget (13 November 2024), the total underspend in
relation to 2024/2025 early outturn work is £5.3 million (Utilities £2.0 million and
Council Tax £3.3 million).  These will be set aside and considered alongside the
Settlement when it is received in mid-December 2024.  These underspends are
shown in Appendix 1.   
4.3. The Executive Committee in November also approved that the Pay Award Funding
(£3.6 million) will be set aside to contribute to the 2025/2026 Pay Award costs.  This
is shown as an underspend in Appendix 1 and will be transferred to Reserves at the
end of the financial year. 
3
19

Page 20

4.4. Section 4.5 onwards provides detail on a number of key budget areas.   
4.5. Teacher Numbers:  As previously reported, in relation to 2024/2025, the Council
has received notification that the allocation of funding for teacher numbers of £145.5
million for 2024/2025 will be distributed via Specific Resource Grants, and those
grants will be conditional on councils agreeing at the outset to maintain teacher
numbers.  Our share of the £145.5 million funding is £9.379 million.  The Scottish
Government has indicated that it will consider mitigations presented by councils for
reducing teacher numbers, but it will not be known if mitigations will be acceptable
until much later in the year.   
4.6. The Scottish Government has responded to communication from Council officers
continuing to reiterate that any mitigations would be considered on a case-by-case
basis, but it will not be in a position to agree any mitigations in advance of the
teacher number census publication (December 2024).  This position was reiterated
by Scottish Government officials at a meeting with Council officers on 27 August
2024.  At the meeting, officers explained the Council’s various mitigations in detail,
and undertook to provide these in writing to the Scottish Government to provide
context to the census information when this is complete.   
4.7. The census position has been agreed with the Scottish Government.  While a further
letter from the Council detailing our mitigation has been acknowledged, no feedback
is anticipated until early December 2024. An update will be provided at the meeting. 
4.8. Employers Pension Contribution Increase (Teachers):  As advised previously, on
1 April 2024, the Council’s pension contribution for Teachers’ Pensions was
increased from 23% to 26% of basic pay.  The cost to the Council is an estimated
£5.5 million.  Local Government will receive an additional £86.2 million of
consequential funding on a recurring basis to support the increase in employer
contributions to teachers’ pensions.  Following discussions between the Scottish
Government and COSLA it has been agreed that the revenue funding should be
distributed using teacher pension contributions from Scottish Public Pensions
Agency.  The Council has now been informed of its specific allocation of this funding
and it is in line with the estimated cost of £5.5 million.  This funding will be paid as a
redetermination of the General Revenue Grant at the end of the financial year. 
4.9. Living Wage: The Living Wage Foundation announced on 23 October 2024 that the
Real Living Wage, which is a voluntary, higher wage than the Government-set
National Living Wage, based on the actual cost of living, has risen from £12.00 per
hour to £12.60 per hour. 
4.10. The Council reviews its pay model in line with the annual announcements on the
Real Living Wage and monitors Real Living Wage developments on an ongoing
basis.   Annual pay awards are also monitored on an ongoing basis as this too
affects the current Council pay model and the hourly rates paid to employees.  The
Council minimum hourly rate is currently £12.82 and sits above the Real living Wage. 
The increase in the Real Living Wage, therefore, does not affect the Council. 
5. Housing Revenue Account Projected Outturn Position as at 1 November 2024
5.1. As at 1 November 2024, Appendix 2 of the report shows a projected break-even
position on the Housing Revenue Account. 
20

Page 21

6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in this
report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
13 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 1 November 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
21

Page 22

Note:  While the Year to Date Actual at period 8 presents a net surplus position (£26.950m), this is timing only.  The forecast outturn
shows an underspend of £8.9 million (section 4.1).
Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 126.205 126.205 0.000 0.00% 69.378
Facilities Waste and Grounds 77.307 77.099 0.208 0.27% 42.034
Leisure and Culture 21.738 21.750 (0.012) (0.06%) 13.708
Planning and Regulatory Services 4.660 4.509 0.151 3.24% 2.438
Enterprise and Sustainable Development 6.239 6.168 0.071 1.14% 4.241
Roads, Transportation and Fleet 16.261 16.679 (0.418) (2.57%) 6.957
Education Resources 463.729 463.729 0.000 0.00% 281.714
Education 463.729 463.729 0.000 0.00% 281.714
Finance and Corporate Resources 39.575 39.575 0.000 0.00% 31.377
Finance Services - Strategy 1.851 1.884 (0.033) (1.78%) 1.870
Finance Services - Transactions 17.684 17.699 (0.015) (0.08%) 11.162
Audit and Compliance Services 0.318 0.304 0.014 4.40% 0.313
Information Technology Services 6.852 6.852 0.000 0.00% 9.680
Communications and Strategy Services 2.584 2.505 0.079 3.06% 1.679
Administration and Licensing Services 4.048 4.059 (0.011) (0.27%) 2.678
Personnel Services 6.238 6.272 (0.034) (0.55%) 3.995
Housing & Technical Resources 14.390 14.390 0.000 0.00% 15.411
Housing Services 8.767 8.692 0.075 0.86% 6.801
Property Services 5.623 5.698 (0.075) (1.33%) 8.610
Social Work Resources 235.200 235.200 0.000 0.00% 133.197
Performance and Support Services 5.806 5.649 0.157 2.70% 2.933
Children and Families 48.199 48.801 (0.602) (1.25%) 26.909
Adults and Older People 180.460 180.460 0.000 0.00% 102.538
Justice and Substance Misuse 0.735 0.290 0.445 60.54% 0.817
Joint Boards 1.902 1.902 0.000 0.00% 1.170
881.001 881.001 0.000 0.00% 532.247
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 881.001 881.001 0.000 0.00% 532.247
CFCR 0.000 0.000 0.000 0.00% 0.000
Loan Charges 39.589 39.589 0.000 0.00% 0.000
Corporate Items 12.845 7.245 5.600 43.60% 0.567
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Total Expenditure 956.725 951.125 5.600 0.59% 532.814
Council Tax 181.587 184.887 3.300 1.82% 111.746
Less: Council Tax Reduction Scheme (23.544) (23.544) 0.000 0.00% (14.489)
158.043 161.343 3.300 2.09% 97.257
General Revenue Grant 386.662 386.662 0.000 0.00% 237.946
Non Domestic Rates 364.911 364.911 0.000 0.00% 224.561
Transfer from Reserves 47.109 47.109 0.000 0.00% 0.000
Total Income 956.725 960.025 3.300 0.34% 559.764
Net Expenditure 0.000 (8.900) 8.900 0.00% (26.950)
Period Ended 1 November 2024 (No.8)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
22

Page 23

Variance Explanations
1. The non-recurring overspend reflects costs associated with new systems development.
2. The underspend is due to the provision for debt being less than budgeted, partially offset by greater than budgeted expenditure on       
repairs and maintenance reflecting the volume and cost.
3. The under recovery in income is due to lower than anticipated income from insurance recoveries and also a lower level of income from
laundry charges.  
4. The transfer to reserves is anticipated to be lower than budget due to the overall projected position for the service.
5. The underspend is due to forecast loan charges being lower than budget and the interest on revenue balances being greater than
anticipated. 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2024/2025 and Monitoring for Period 8 -
1 April 2024 to 1 November 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
urpose]
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2024 to 1
November 2024 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the position of the General Fund Capital Programme (Appendices 1 to 3)
and the Housing Capital Programme (Appendix 4) as at 1 November 2024, be
noted; 
(2) that the adjustments to the General Fund programme, listed at Appendix 1, be
approved; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum.
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 1 November 2024 (period 8).  Spending has been split into two separate sections
below: 
 General Fund Capital Programme inc. Education, Social Work, Roads and
General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme 
4.1. 2024/2025 Budget:  The revised programme for the General Fund is £69.832 million. 
This revised programme consists of the base budget plus carry forward projects and
adjustments which have been agreed by the Executive Committee up to and including
its meeting on 13 November 2024. 
4.2. In addition, the total programme of £69.832 million also includes proposed
adjustments totalling £6.960 million.  These are detailed in Appendix 1. 
4.3. The overall programme movement is detailed in Appendix 2.  
4
25

Page 26

4.4. 2024/2025 Forecast:  As noted in 4.2, the total capital programme for the year is
£69.832 million (see Appendix 3).  The forecast spend for the current year is
currently £69.132 million, an underspend of £0.700 million.   
4.5. This forecast underspend relates to 3 Roads projects:  Lanark Road Signalisation
(£0.270 million), Clyde Bridge (£0.256 million) and Daer Bridge (£0.174 million).
Together these underspends reflect project savings of £0.700 million.  Given these
are roads related projects, this budget will be carried forward and considered for
Roads’ capital projects as part of the capital programme for 2025/2026.  This
programme will be presented to Members in February 2025.     
4.6. The Council has recently received confirmation of the Levelling Up Funding for the
Three Rivers / Clydesdale Way project.  Now that this confirmation has been
received, officers will work to establish a spend profile, with any current year
underspend being carried forward at the end of the financial year.  This will be
confirmed at the year end. 
4.7. 2024/2025 Actual Position:  Actual spend incurred to the 1 November 2024 totals
£21.114 million.   
4.8. Actual funding received to 1 November 2024 is £42.202 million. This is shown in
Appendix 3.  Relevant officers will continue to closely monitor the generation of all
income. 
5. Housing Programme 
5.1. 2024/25 Budget: Appendix 4 summarises the position on the Housing programme as
at 1 November 2024.  The revised capital programme for the year is £77.248 million,
as approved by the Executive Committee on 13 November 2024.  Programmed
funding for the year also totals £77.248 million. The funding sources are also detailed
in Appendix 4. 
5.2. 2024/2024 Forecast:  As noted in 5.1, the total capital spending programme for the
year is £77.248 million.  Current estimates from Housing and Technical Resources
have identified an outturn of £72.106 million for the year. 
5.3. As noted in the last report, the forecast underspend of £5.142 million is within the
Affordable Housing programme and is the result of delays in site starts at Cairnswell
Avenue, Cambuslang (£1.5m) and Brackenhill Farm, Hamilton (£1.0m).  In addition,
while 150 properties are still assumed through the Market Purchase Scheme this
financial year, the average purchase price assumed has reduced from £0.115 million
per property to £0.100 million per property reflecting the current size of properties we
are purchasing (£2.25m). The balance is from minor slippage in other projects.  The
Scottish Government Grant will be claimed in full this financial year.  Opportunities
continue to be explored to utilise the uncommitted £5.142 million in the current
programme which is to be funded by Council borrowing. 
5.4. 2024/2025 Actual Position:  Spend to 1 November 2024 on the Housing Capital
Programme amounts to £29.530 million.   
5.5. As at 1 November 2024, £29.530 million of funding had been received. 
5.6. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee.
26

Page 27

6. Employee Implications
6.1. None 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and, therefore, no impact assessment
is required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
19 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 13 November 2024 
List of Background Papers
 Capital Ledger prints to 1 November 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
27

Page 28

APPENDIX 1 
Proposed Adjustments 
Community and Enterprise Resource 
Priory Changing Pavillion, Blantyre
An additional allocation of £0.250 million has been approved at Executive
Committee (13 November 2024) from Phase 2 of the Leisure and Culture
Transformation Fund.  This is to reflect the revised costs of the new modular unit
and demolition of the old facility.  Now that this funding has been agreed, the project
will be tendered however work is unlikely to progress before the end of the financial
year.   
Approval is sought to slip £0.236 million into financial year 2025/2026 to reflect the
revised timescales for this project. 
Lanark Library
A further allocation of £0.210 million has been approved at the Executive Committee
(13 November 2024) from Phase 2 of the Leisure and Culture Transformation Fund.  
This is to reflect the increased cost of the project.  As the funding has been agreed
the contractor can be appointed, however full spend will not be incurred this financial
year reflecting the project plan. 
Approval is sought to slip £0.442 million into financial year 2025/2026 to reflect the
revised timescales for this project. 
Langlands West
This project has been delayed due to the timing of concluding works at Greenhills
Road which this project is dependent on completion for remediation works to
commence. 
Approval is sought to slip £0.450 million into financial year 2025/2026 to reflect the
revised timescales for this project. 
Hamilton Junctions Upgrade
Works were anticipated to commence earlier in 2024/2025, however programming
discussions have been ongoing with the contractor, and due to the contractor’s
availability and the need to avoid other scheduled works, it is now anticipated that
works will commence in January 2025.  This project will now straddle financial years
before being completed in 2025/2026. 
Approval is sought to slip £3.333 million into financial year 2025/2026 to reflect the
revised timescales for this project. 
Clyde Bridge
The project is substantially complete.   
Approval is sought to slip £0.192m million into financial year 2025/2026 for the
retention payment required. 
(£0.236m) 
(0.442m) 
(£0.450m) 
(£3.333m) 
(£0.192m) 
28

Page 29

Hairmyres Station Park and Ride (including Active Travel Infrastructure)
The Hairmyres Station Park and Ride project, and associated travel infrastructure
works, are due to complete by summer 2025.   
Approval is sought to slip £1.450 million into financial year 2025/2026 to reflect the
timing of expenditure on the project and associated travel infrastructure works
around the new railway station. 
(£1.450m) 
Housing and Technical Resource 
Alarms (Analogue to Digital) Fire Alarm System Upgrade
In order to reflect the timescales to undertake assessments and work with providers
to make the necessary changes to the fire alarm systems, there will be limited spend
on this project in this financial year. 
Approval is therefore sought to slip £0.607 million into financial year 2025/26 to reflect
the revised timescale of the project. 
Minor Adjustments 
(£0.607m) 
(£0.250m) 
TOTAL ADJUSTMENTS (£6.960m) 
29

Page 30

APPENDIX 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 1 NOVEMBER 2024 
£m  
Total Base Budget (including carry forward from 2023/2024)  76.792 
Proposed Adjustments – Period 8 (6.960)  
Total Revised Budget 69.832     
2024/25
Budget 
Period 8
Proposed
Adjustments 
Revised
2024/25
Budget
Resource £m £m £m    
Community & Enterprise 53.679 (6.315) 47.364
Education 8.371 - 8.371
Finance & Corporate 3.086 - 3.086
Housing & Technical 10.629 (0.645) 9.984
Social Work 1.027 - 1.027    
TOTAL CAPITAL PROGRAMME 76.792 (6.960) 69.832         
30

Page 31

APPENDIX 3
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 1 NOVEMBER 2024 
2024/25
Original
Estimate
inc C/F 
2024/25
Revised
Budget 
2024/25
Forecast 
Spend 
2024/25
Forecast
Variance 
2024/25
Actual to
01/11/24      
Expenditure £m £m £m £m £m      
General Fund Programme 73.850 69.832 69.132 - 21.114 
Income
2024/25
Budget
2024/25
Revised
Budget  
2024/25
Actual
To
01/11/24         
£m         £m   £m
Prudential Borrowing 32.564 17.560   17.560
Developers Contributions 8.800 7.474   0.000
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund, Cycling
Scotland, Transport Scotland and REF /
Wind Farms) 
0.958 4.814   1.154
Scottish Government:     
- Capital Grant 20.156 22.278   14.476 
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant)
1.440 0.000   0.000 
- Road Safety Improvement  0.000 0.497   0.000 
- Vacant and Derelict Land 1.793 1.343   1.368 
- Regeneration Capital Grant  2.170 2.170   0.997 
- Place Based Investment
Programme
0.727  1.056  0.727
- Universal Free School
Meals
0.000 0.332   0.000
Shared Prosperity Fund 2.645 2.649   0.000
Levelling Up Fund 0.000 7.400   2.839
Capital Receipts 1.340 1.340   2.288
Specific Reserves 1.257 0.919   0.793
Revenue Contribution 0.000 0.000   0.000      
TOTAL FUNDING 73.850 69.832   42.202  
31

Page 32

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 1 NOVEMBER 2024 
2024/25
Annual 
Budget  
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25 
Actual to
01/11/24 
£m £m £m £m
Expenditure 
2024/25 Budget  77.248  72.106  5.142  29.530     
2024/25
Annual 
Budget  
2024/25
Actual to
01/11/24 
£m   £m
Income         
Capital Receipts 0.000   0.265
Capital Receipts – Land Sales 0.000   0.000
Capital Funded from Current Revenue 33.506   20.741
Prudential Borrowing 23.363   0.000
Scottish Government Specific Grant:    
- New Build 17.259   8.033
- Open Market Purchase Scheme 3.000   0.000
- Mortgage to Rent 0.120   0.263
Other Income 0.000   0.228 
77.248   29.530 
32

Page 33

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (13 November 2024)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £10.082 million, detailed in Appendix 1, be
noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in Appendix 1 of the report. The report
details additional funding that has been reported by Resources as part of the additional
resources notification process, as well as any additional funding that has increased
the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £10.082 million has been identified for 2024/2025. This
is detailed in Appendix 1. 
5.2. The total additional funding is therefore, £10.082 million and Resource budgets will be
updated to reflect this additional funding as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval.  
5
33

Page 34

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 13 November 2024 
List of Background Papers
 Additional Funding Grant Awards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
34

Page 35

Appendix 1 
Additional Revenue Funding  
Resource  Description  2024/2025
£m 
Total
£m 
Method
Finance
and
Corporate
2024/2025 Local Government Pay Offer (for
SJC, Craft and Chief Officer staff) 
To support the 2024/2025 local government
pay offer (for SJC, Craft and Chief Officer
staff). 
4.585 4.585 Scottish
Government 
Finance
and
Corporate
2024/2025 Teachers Pensions 
To support the increase in employer
contributions to Teachers Pensions. 
5.497 5.497 Scottish
Government 
TOTAL REVENUE FUNDING 10.082 10.082 
35

Page 36

36

Page 37

1 
Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Glasgow City Region City Deal – Centre West, East
Kilbride: Outline Business Case 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 set out the Outline Business Case (OBC) for the Centre West, East Kilbride
project
 advise the Committee on the next steps in developing and delivering the project
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Outline Business Case for the Centre West, East Kilbride project be
approved; 
(2) that, subject to Glasgow City Region’s reallocation to the Council of £11.1m from
the Glasgow Airport Access project, funding is approved for the delivery of the
Centre West project as set out in paragraph 7.2;
(3) that the proposed next steps in developing the project be approved;
(4) that grant funding be sought in accordance with the City Deal Grant Distribution
Process outlined in the Assurance Framework in relation to preliminary costs;
and
(5) that the relevant Full Business Cases for the project and associated sub-projects
be developed for future presentation to the Executive Committee and City
Region Cabinet.
[1r
3. Background
3.1.   The Council is one of eight local authorities who, with the UK Government and the
Scottish Government, are signatories to the £1.13 billion Glasgow City Region City
Deal signed on 20 August 2014.  
3.2.   The City Deal initiative comprises an initial list of 20 key projects which are 
intended to collectively drive economic growth across the City Region.  
3.3.   The proposed Centre West project is one of South Lanarkshire Council’s City Deal
funded projects, the others being Cathkin Relief Road (complete), Greenhills Road
(complete), the four Community Growth Areas at Newton, East Kilbride, Hamilton
and Larkhall (in progress) and the Stewartfield Way project. 
6
37

Page 38

2 
3.4.  Governance arrangements for the City Deal initiative are defined within the
associated Assurance Framework. This sets out requirements for the development
of Business Cases for individual projects.   
3.5.  Each Outline Business Case for each project requires to be formally approved via
the:-
 Member Authority Council 
 City Region Chief Executives’ Group 
 City Region Cabinet 
4. Current Position 
4.1.  In line with town centres throughout the country, East Kilbride town centre has faced
significant challenges over the past few years. Changes in consumer behaviour, the
economic downturn and Covid 19 pandemic have all been contributory factors to the
decline of the town centre resulting in the shopping centre going into administration
in November 2022. Centre West is held under a ground lease from the Council.
Given the many challenges facing Centre West, Administrators have noted their
intention to hand this section of the shopping centre to the Council. Heads of Terms
have been agreed with the Administrators and were approved at Executive
Committee on 13 November 2024. 
4.2. Significantly, East Kilbride shopping centre forms the entirety of the town centre.
Investment is required now to respond to the challenging environment, safeguard
significant economic activity in the town centre and support regeneration of a key
town asset to ensure long-term sustainability. Council officers have been working in
partnership with asset managers to develop a masterplan for East Kilbride town
centre. 
4.3. The East Kilbride Town Centre Masterplan was approved by the Executive
Committee on 13 September 2023 and sets the strategic direction of the town centre
for the next 20 years.  Thereafter, on 8 May 2024, the Executive Committee
approved development of the East Kilbride Town Centre project and the rescoping of
the original Stewartfield Way Capacity Enhancement project to include the Town
Centre.  This led to the realignment of the approved project budget of £62.2 million,
with £32.2m now allocated towards the town centre and £30 million remaining for the
Stewartfield Way Capacity Enhancement project. 
4.4. The Centre West project has progressed to the stage that an Outline Business Case
can now be produced detailing:-  
 Strategic Case
 Economic Case
 Commercial Case
 Financial Case
 Management Case 
4.5. The project is expected to deliver: 
 Enabling works at Centre West mall including site enabling, demolition,
infrastructure and utility works to support the creation of development plots. 
38

Page 39

3 
 Support the provision of circa 250 - 300 new town centre homes, with 25% to
be social housing to be transferred back into public ownership. SLC will enter
into agreement with a private sector developer to deliver the private and social
housing at the former Centre West site. 
 Creation of a new civic hub building at the former Centre West site that will
provide a range of community, arts, and leisure facilities, including arts
venue/performance space and library.  The building will also provide some
office space for the Council. 
 Creation of a new civic square and streetscape improvement works to enhance
the physical fabric, vibrancy, and ‘feel’ of the town centre – delivering a high-
quality urban environment.
 Over the 25-year appraisal period the total net present value GVA (Gross Value
Added) impacts are £749.8M (South Lanarkshire), £1,088.2M (Glasgow City
Region), £1,267.7M (Scotland). 
4.6.  The production of the OBC is another key milestone and provides the basis for further
development of the project. The approval of this OBC by the City Region Cabinet on
25 February 2025 will be conditional on the Executive Committee approval being
given today.  
4.7.  It is intended that this culminates in the development and completion of a Full
Business Case (FBC) from 2025/2026, following completion of statutory processes
and project tendering arrangements. 
5. Delivery Timeline 
5.1.  The OBC sets out an indicative timescale of when the project will progress through
each delivery stage as follows: 
 Decommissioning of Centre West and preparation of a demolition strategy –
ongoing to January 2026 with transfer of Centre West to the Council taking
place on 30 December 2025.
 FBC Submission and Approval: between Q4 2025 and Q4 2026
 Planning Consultation / Consents etc: ongoing to July 2026
 Tender preparation / Procurement Process / Demolition Contract Award:
January 2025 to December 2026
 Demolition works – January 2026 – December 2026
 Site enabling/infrastructure works – January 2027 – October 2027
 Civic Hub and Housing Construction – from October 2027.
 Project Monitoring and Evaluation – ongoing to 2035 
6. Employee Implications 
6.1.  Existing officers in Community and Enterprise Resources are currently tasked with the
management, delivery, monitoring and evaluation of this City Deal project. 
6.2. To assist the Council, a multi-disciplinary team has been procured, led by Turner
Townsend Project Management and supported by Will Rudd, A10, Threesixty
Architecture and Savills. In addition, Burness Paull have been appointed to provide
legal advice alongside Knight Frank who provide commercial real estate advice. 
7.  Financial Implications 
7.1. The total cost of the Centre West project is expected to be £50.3 million. Over the
lifetime of this project, grant totalling £32.2 million (64%) is expected from City Deal.    
39

Page 40

4 
7.2.  The Council’s element of funding is anticipated from capital receipts associated with
the ultimate disposal of Civic Centre and residential development plots at Centre West
totalling £6m.  In addition, it is anticipated that the Council, will receive a further
£11.1m from City Deal as part of the reallocation of the Glasgow Airport Access
monies which will be subject to Glasgow City Region Cabinet approval in February
2025.  There is an expectation by Glasgow City Region that this funding will be utilised
to secure the delivery of existing City Region projects.  In order to realise the vision of
the East Kilbride Town Centre Masterplan and specifically deliver the Centre West
project, it is recommended to utilise the additional £11.1m City Deal monies as part of
the overall funding package.  It is also proposed to allocate £750,000 from the
2025/26 UK Shared Prosperity Fund and the Council’s Capital Programme also
includes £300,000 for this project in 2024/2025.  The anticipated expenditure and
funding are summarised in Table 1. 
Table 1 – Summary of Expenditure and Funding 
£m
Project Cost 50.3  
Project Funding: 
City Region City Deal Grant 32.2
Civic Centre / Centre West Development Plots 6.0
Reallocation of Glasgow Airport City Deal monies 11.1
Shared Prosperity Fund 0.7
Capital Programme Budget 2024/2025 0.3
Total Funding 50.3 
7.3 As the Full Business Case is being developed, officers will continue to explore
additional external funding opportunities.   
7.4 The City Deal Assurance Framework allows grant to be awarded at each Business
Case stage (Strategic, Outline and Full) to meet the costs incurred by the Council
leading up to the approval of the Full Business Case(s) and the formal award of
contracts associated with capital expenditure. Project management, design fees, site
surveys and intrusive investigations will be required through this framework to support
the creation of a demolition strategy and design development.  Approval to incur
expenditure of up to £4 million is included in the Outline Business Case. 
8. Climate Change, Sustainability and Environmental Implications
8.1. All projects will be taken forward in line with the Council’s sustainability objectives. 
9.  Other Implications 
9.1.  The City Deal Cabinet has a Risk and Issues Management Strategy to be applied
across all City Deal projects. The purpose of this strategy is to provide a systematic
and effective method by which risks can be consistently managed. It adopts a best
practice approach, describes the specific risk management techniques and standards
to be applied and the responsibilities for achieving effective risk management. The
Council is required to apply this strategy across each of its City Deal projects to
ensure consistency across all City Deal projects. This will be a key tool in mitigating
project risks and thereby limiting our financial risk associated with our share of City
Deal project costs.  
40

Page 41

5 
9.2.  The processes associated with the approval of the Centre West project have
considered the following sustainability agenda items and are subject to monitoring and
review as detailed proposals for each phase of the development progress:-  
 choice of materials and the use of low and zero carbon generating technologies 
 support sustainable water resource management 
 support sustainable waste management 
 Consideration of the lifecycle costs and impacts of the development 
 encourage the use of sustainable and recycled materials in construction 
9.3 The Centre West Outline Business Case is the last project to seek approval from
Glasgow City Regional from across the programme.  All projects were given a
deadline of November 2024 to obtain approval however the Centre West project was
provided an extension to February 2025 due to this being a new project recently
identified.  There is no opportunity for a further extension to be granted to allow for
further development of the project as this will jeopardise the drawdown of funding from
the UK Government for the entire Glasgow City Region programme.   
9.4 A full and robust monitoring process will be put in place following approval of the
project / associated sub projects by the City Region Cabinet. 
10.  Integrated Impact Assessment and Consultation Requirements
10.1. Consultation has taken place with relevant Resources within the Council, the City
Region Programme Management Office and local stakeholders. This is set out within
the relevant business cases. Further consultation will take place as part of the
statutory approvals process and as the project progresses to the delivery stage. 
10.2. The report does not presently introduce a new policy, function or strategy or
recommend a significant change to an existing policy, function or strategy, and,
therefore, no integrated impact assessment is required. However, as the project
develops and progresses to delivery stage an Integrated Impact Assessment will be
undertaken in line with Council policy.  
David Booth
Executive Director (Community and Enterprise Resources) 
26 November 2024   
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs 
 We will work towards a sustainable future in sustainable places 
 Good quality, suitable and sustainable places to live 
 Thriving business, fair jobs and vibrant town centres 
 Caring, connected, sustainable communities 
Previous References
 Community and Enterprise Resources Committee, 23 April 2024
 Executive Committee, 8 May 2024 
41

Page 42

6 
List of Background Papers 
 Centre West Project Outline Business Case 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Ross, Economic Development Manager
E-mail: iain.ross@southlanarkshire.gov.uk 
42

Page 43

East Kilbride Town Centre
Outline Business Case –
Executive Summary 
Report version 1 | November 2024
6
43

Page 44

Please consider the environment before printing this document
Direct enquiries regarding this report should
be submitted to:
EKOS Limited, 
St. George’s Studios, 
93-97 St. George’s Road, 
Glasgow, G3 6JA
Reg 145099
www.ekos-consultants.co.uk 
44

Page 45

Contents
1 Executive Summary i
1.1 Introduction i
1.2 Strategic Case ii
1.3 Economic Case 1
1.4 Commercial Case 4
1.5 Financial Case 6
1.6 Management Case 7 
45

Page 46

i
1 Executive Summary
1.1 Introduction
This Outline Business Case (OBC) is requesting capital funding of £32.2m, to support the East
Kilbride Town Centre (EKTC) redevelopment project. 
In addition, it is requested that SLC contribute £18.1m capital funding to meet the total project
costs. The total public sector investment cost to deliver the project is £50.3m.
• City Deal - £32.2m.
• SLC capital funding - £18.1m including the reallocation of £11.1m of the Glasgow City
Region Glasgow Airport Access monies.  
1.1.1 Project Scope 
Informed by a significant public consultation programme that included feedback from over 3,000
members of the public, a Masterplan to support the future regeneration of EKTC was prepared by
ThreeSixty Architects. 
46

Page 47

ii
GCRCD Funded Activity: 
• SLC assume ownership of the commercially unviable Centre West building and lead
the demolition, site clearance and enabling infrastructure works – local road, junctions,
and utilities/services upgrade (including installation of district heating infrastructure). 
Heads of Terms with the Administrators have been agreed with a transfer date of 30
December 2025 agreed.  
• Creation of a new civic hub building that will provide a range of community, arts, and
leisure facilities, library, and office space. 
• Creation of a new civic space and streetscape improvement works to enhance the
physical fabric, vibrancy, and ‘feel’ of the town centre – delivering a high-quality urban
environment.
• Demolition of the Civic Centre building to attract private investment and support new
town centre uses. 
Follow-on Activity Catalysed by GCRCD Investment:
• Relocation of existing tenants to other areas/units in the town centre. 
• SLC seeking to enter into a partnership agreement with a private sector developer to
deliver the private and social housing at the former Centre West Site (c 300 units, 25%
social housing that will be transferred back into public ownership). 
• Private sector led retail development – creation of a new 45,000 sqft food superstore
and petrol filling station at the Olympia Mall. This will also include 250 parking spaces.
• Private sector led leisure development – creation of a new 50-bedroom budget hotel
at the Princes Mall.
• Private sector led development – as part of the wider regeneration programme for the
town centre, SLC is currently marketing the Civic Centre site and have interest from
several investors/developers. The discussions are currently confidential with a
deadline for bids set at 30th January 2025. 
1.2 Strategic Case 
The OBC makes a compelling case for why intervention is needed and considers the:
• External environment and provides a summary of time-series data that shows the key
trends within East Kilbride across several socio-economic indicators, and where
appropriate draws comparison with South Lanarkshire and Scotland. 
• Challenges facing EKTC and the changing nature of town centres across Scotland,
more generally. 
47

Page 48

iii
1.2.1 Policy Fit
UK Level 
• Growth Plan 2022.
Scotland Level
• National Performance Framework.
• Scotland’ National Strategy for Economic Transformation.
• National Planning Framework 4.
• Infrastructure Investment Plan for Scotland 2021-22 to 2025-26.
• Equality, opportunity, community – New leadership – A fresh start.
Glasgow City Region and Local Policy
• Glasgow City Region Deal. 
• Glasgow City Region Economic Strategy.
• Clydeplan.
• Connect – Council Plan 2022-2027.
• South Lanarkshire Local Development Plan 2.
1.2.2 Rationale for Intervention 
East Kilbride Town Centre has experienced a very difficult period and its future is uncertain. There
are currently around 3,000 jobs based in the town centre and recent high profile and large
employer losses include Marks and Spencer, Debenhams, and Sainsburys (representing around
500 jobs). 
There are currently 75 vacant units and 507,000 sq ft of empty floor space. In addition, the
significant footprint of the town centre (1.3 million sqft) means that it has significant ongoing costs
(utilities, overheads, maintenance, Non-Domestic Rates, etc) - £6.35m per annum.
The town centre operators were placed into administration in November 2022 and the asset
managers have identified that Centre West has several challenges which make it commercially
unviable, including: 
• Centre West relied on long-term leases which were put in place at the outset,
however, these have come to an end and there are no longer sufficient occupiers for
this type of space (larger floorplates).
• Centre West has had limited investment and there is now a significant backlog of
repairs and maintenance required - £11.07 million. It is unlikely that any incoming
investor would take on this level of liability.
48

Page 49

iv
• Centre West is held under a ground lease from the Council for which SLC received
£600,000 per annum. The Administrators have advised that future payments will not
be forthcoming due to the levels of debt associated with Centre West.
• Centre West is running at a loss of £426,000 per annum.
The asset managers are therefore seeking to dispose of the Centre West building/site and transfer
ownership to SLC, and have brought the remaining elements of the town centre (Olympia Mall and
Princess Mall) to the market - deadline for bids is the 28th November 2024.
Investment is required now to respond to the challenging environment to safeguard significant
economic activity at EKTC and support regeneration of a key town asset to ensure the long-term
sustainability of a vibrant town centre built for the future.
1.2.3 Opportunity 
The way in which we use our town centres has fundamentally changed and therefore they ways in
which we intervene and the mechanisms we use to support regeneration must also change.
Adopting a more holistic place-based approach that has got community wellbeing and
sustainability as its focus is the key driver for regeneration.
A public consultation was undertaken to gather feedback and inform the developing Masterplan
being prepared by ThreeSixty Architecture - In total, over 3,000 responses were received for the
consultation.
49

Page 50

v
SMART Objectives
Objective Specific Measurable Attainable Relevant Time-bound
1. Support the
redevelopment and
regeneration of East
Kilbride town centre
Delivery of City Deal and follow-on projects:  
• New civic heart 
• Streetscape and infrastructure
improvements 
• Demolition and site enabling works 
Measurable by property
development activity – sqm
of commercial space,
number of housing units
To be delivered by private
developers and
dependent on City Deal
funding for enabling
infrastructure
Based on identified
sites and aligned with
policy objectives
Project completed by
2028
2. Create and new
economic activity –
employment and
training opportunities
Direct impacts during the construction of the
road and enabling works. Indirect impacts
from leverage investment in development
sites and retained and new jobs at EKTC. 
• 580 gross construction jobs
• 25 training opportunities
• 260 gross jobs created from follow on
investment 
Measurable by direct jobs
and GVA, indirect jobs and
GVA and number of
apprenticeships, job
training opportunities
created
SLC have control over
project delivery and can
influence direct project
impacts- jobs, GVA and
training opportunities.
Indirect impacts are
subject to private sector
follow-on activity.  
Based on a project level
data and a bespoke
economic impact
appraisal.
Direct impacts to be
achieved by 2028
3. Retain and attract
new footfall and
expenditure to the
town centre
Create a vibrant and modern space with a
diversified offering of retail, food and drink
provision, leisure and entertainment to create
an attractive daytime and night-time economy
offer that attracts residents and visitors from
across the region.
• 95% long-term occupancy at TC
shopping centre
• 1,550 gross jobs retained TC
shopping centre 
Measurable by monitoring
shopping centre occupancy
rates and direct jobs on-site.
Based on a review of
existing shopping centre
activity and recent
changes in occupancy
rates and a review of the
reduced building footprint
and available number of
units.
Based on a project level
data and a bespoke
economic impact
appraisal.
Benefits accrue
following the
completion of the
entire project including
private sector
investment. .
4. Attract and
leverage new
investment to East
Kilbride
Attract new investment to East Kilbride for
residential and commercial activity:
• Total (public and private) investment
value: £121million
• New residential units – 300
• New commercial floorspace
(supermarket - 45,000 sq ft, hotel,
21,500 sq ft)  – 66,500sq ft
Measurable by total
investment values 
Based on engagement
with private developers
and property agents
Based on delivery of
Objective #3; aligned
with policy objectives
Benefits accrue
following the
completion of the
project 2028 – follow-
on activity to be
delivered by 2035.
50

Page 51

1
1.3 Economic Case 
1.3.1 Shortlisted Options
Option Description
Option 1: Do nothing The business-as-usual or counterfactual position considers what would happen in
the absence of public sector intervention
Option 2: Do
minimum
SLC take ownership of Centre West and continue to operate it based on the
existing terms
Option 3: Smaller
regeneration project 
Delivery of community infrastructure and streetscape improvement works. Under
this option we have assumed that the asset managers will seek a buyer for the
remaining building - Olympia Mall and Princes Mall 
Option 4: Preferred
way forward  
Enabling works (demolition, site clearance, etc), delivery of community
infrastructure and streetscape improvement works, and engage private sector to
deliver residential and other commercial developments (retail and leisure)
1.3.2 Benefits 
Over the 25-year appraisal period, the total present value net GVA impacts are outlined below.
Cumulative 25-Year Impacts (Net GVA)      
Option 1 Option 2 Option 3 Option 4
South Lanarkshire
Construction PYEs 0 0 110 230
GVA £0.0 £0.1 £6.8 £14.5
Operational FTEs 740 740 1,100 1,240
GVA £501.6 £564.9 £652.5 £735.3
Total GVA £501.6 £564.9 £659.4 £749.8
Glasgow City
Region
Construction PYEs 0 0 260 560
GVA £0.0 £0.1 £16.5 £35.0
Operational FTEs 1,030 1,030 1,490 1,680
GVA £734.2 £826.7 £935.6 £1,053.1
Total GVA £734.2 £826.8 £952.1 £1,088.2
Scotland
Construction PYEs 0 0 260 560
GVA £0.0 £0.1 £16.6 £35.5
Operational FTEs 1,160 1,160 1,670 1,890
GVA £869.1 £978.7 £1,098.4 £1,232.2
Total GVA £869.1 £978.8 £1,115.0 £1,267.7
PYEs and FTEs rounded to nearest 10. GVA rounded to nearest £0.1m and discounted at 3.5% annually.
Note 1 Figures do not include the redevelopment of the Civic Centre site as at the time of reporting the
specific end use was confidential and not confirmed. This will be updated at FBC stage. 
51

Page 52

2
1.3.3 Value for Money 
The public sector cost benefit ratio which sets Present Value Net Additional GVA impacts against
present value public sector costs are present below.
Public Cost Benefit Ratios 
Public
Sector
Capital
Costs
Public
Sector
Revenue
Costs
Total Present
Value Costs
Present
Value Net
GVA
BCR
Option 2
South Lanarkshire £0.4 £13.1 £13.5 £63.3 4.7
Glasgow City Region £0.4 £13.1 £13.5 £92.7 6.9
Scotland £0.4 £13.1 £13.5 £109.7 8.1
Option 3
South Lanarkshire £38.7 £0.0 £38.7 £157.7 4.1
Glasgow City Region £38.7 £0.0 £38.7 £217.9 5.6
Scotland £38.7 £0.0 £38.7 £245.9 6.4
Option 4
South Lanarkshire £50.4 £0.0 £50.4 £248.2 4.9
Glasgow City Region £50.4 £0.0 £50.4 £354.0 7.0
Scotland £50.4 £0.0 £50.4 £398.5 7.9
Values rounded to nearest £0.1m and discounted at 3.5% annually.
Note 1: Figures do not include the redevelopment of the Civic Centre site as at the time of reporting the
specific end use was confidential and not confirmed. This will be updated at FBC stage.
The summary benefits set against City Deal Key Economic Performance Indicators are presented.  
52

Page 53

3
City Deal Key Economic Performance Indicators
Output
Category
Output
Reference Benefit Geographic
Level
Value
By 2035
Value
Over 25
Years
Employment
EMP_01 Gross Construction PYE by
2035
Glasgow
City Region 580  -
EMP_02 Net Additional Construction
PYE by 2035
Glasgow
City Region 560  -
EMP_03 Gross Operational FTEs by
2035
Glasgow
City Region 1,810  -
EMP_04 Net Additional Operational
FTEs by 2035
Glasgow
City Region 660  -
GVA
GVA_GCR_01 Net Additional GVA by 2035
(£m)
Glasgow
City Region £176.1  -
GVA_GCR_02 Net Additional GVA over 25
year period (£m)
Glasgow
City Region  - £354.0
GVA_SCOT_01 Net Additional GVA by 2035
(£m) Scotland £195.6 - 
GVA_SCOT_02 Net Additional GVA over 25
year period (£m) Scotland  - £398.5
Investment
OFL_01 Direct Project Private Sector
Investment by 2035 (£m)
Glasgow
City Region £0.0 - 
OFL_02
Net Additional Private Sector
Investment (Follow-on) by
2035 (£)
Glasgow
City Region £65.3 - 
OFL_03 Total Investment Combined
(£m)
Glasgow
City Region £65.3  -
OFL_04 Other Public Sector
Investment Leveraged
Glasgow
City Region £23.9  -
BCR
BCR_01 Value of Net Additional
Benefits over 25 Years (£m)
Glasgow
City Region  - £354.0
BCR_02 Value of Public Sector Costs
over 25 Years (£m)
Glasgow
City Region  - £50.4
BCR_03 Public Benefit Cost Ratio over
25 Years
Glasgow
City Region -  7.0
PYEs and FTEs rounded to nearest 10. GVA rounded to nearest £0.1m and discounted at 3.5% annually.
Note 1: Figures do not include the redevelopment of the Civic Centre site as at the time of reporting the
specific end use was confidential and not confirmed. This will be updated at FBC stage.  
53

Page 54

4
1.4 Commercial Case 
1.4.1 Addressing Partners’ Needs  
The preferred option was developed based on a review of market demand/need and through a
public consultation that received over 3,000 responses to inform an emerging Masterplan.  
The development of the preferred option took account of factors including risk, impact, cost, value
for money, and also specifically considered whether the preferred solution addressed the
identified market failure and the needs of project partners. 
1.4.2 Delivering Follow-on-Investment
Achieving success over the longer term is dependent on securing follow-on investment from the
private sector to deliver the following leveraged activity: 
• New residential (c. 300) units at the Centre West site. 
• Food retail supermarket (45,000sq ft) and 250 car parking spaces. 
• 50-bed hotel.
• Confidential (and still to be confirmed) development at the Civic Centre site. Potential
end uses could include residential, business space, and retail. 
The need for follow-on investment and development activity is identified as a key external
dependency of the project. It should be noted that in the absence of the project, there will be no
follow-on investment, and no additional housing constructed.
No other alternative funders or sources have been identified – in the absence of the follow -on
investment at the scale and timing as outlined in the Economic Case then this will have an impact
on the project’s delivery and ability to generate the intended outcomes and benefits. 
1.4.3 Procurement Strategy
All procurement will comply with SLCs Procurement Strategy (2023-28) and will also follow the
Scottish Government’s Procurement Journey as best practice for public sector procurement as well
as the Glasgow City Region Sustainable Procurement Strategy.  
54

Page 55

5
Tendering for Required Services 
The tender will break down into appropriate work packages and seek a single contractor to deliver
the required services for each work package:
• OBC stage -– RIBA stage 3: Spatial coordination, RIBA Stage 4: Technical design.
• FBC stage - RIBA stage 5: construction, RIBA stage 6: Handover and Close Out, and
RIBA stage 7: in use. 
The key Tender Stages for a traditional design and build project include:
i. Tender advertised via Public Contracts Scotland.
ii. Invite organisations to express interest at the notice stage.
iii. Invite organisations that meet the basic qualifier requirements to the ITT.
iv. Companies submit ITT tender documents.
v. Tender bids are scored and evaluated.
It is recommended that SLC undertake a restricted tendering exercise and given the type of works,
it is suggested that an NEC form of Contract the most appropriate form for Civil Engineering and
related works (Roads), and the SBCC JCT form for general construction works. The Council have
used these forms successfully for a number of years. The GCR City Deal Legal and Procurement
Sub Group have, in conjunction with the Civil Engineering Contractors Association (CECA), held
workshops with Council Officers from technical, legal and procurement disciplines as well as
representatives from the market place in a bid to ensuring a common approach to administering
this form of contract.
Key procurement milestones will be agreed as the project programme continues to evolve.
Currently, construction works are programmed to begin in December 2026.
Procurement Milestones
Action Programme Date
Tender return for EK Project Construction December 2025 
Complete FBC and update commercial and financial case  October 2026
Commencement of works January 2026
Completion of works December 2028
Project Monitoring and Evaluation Ongoing to 2035 
55

Page 56

6
1.5 Financial Case 
The total public sector capital costs to deliver the project are £50.3m, broken down as follows: 
• City Deal: £32.2m.
• SLC capital funding - £18.1m including the reallocation of £11.1m of the Glasgow City
Region Glasgow Airport Access monies and capital receipts from the sale of Centre West
and Civic Centre sites (c. £6m). 
Expenditure on project development and preliminary works will run from 2024 to 2025. The
construction period is estimated to be between December 2026 and March 2028.
Phasing of Project Costs 
2024 2025 2026 2027 2028 Total
Cost £503,000 £4,527,000 £9,054,000 £18,108,000 £18,611,000 £50,300,000
% of total 1% 9% 18% 36% 37% 100%
The total amount of leveraged private funding and estimated profile is outlined below. 
Estimated Follow-on Investment (£m) 
2024 2025 2026 2027 2028 2029 Total
Residential development £0.0 £0.0 £0.0 £17.2 £17.2 £15.2 £49.6
Supermarket £0.0 £0.0 £10.4 £0.0 £0.0 £0.0 £10.4
Budget hotel  £0.0 £0.0 £0.0 £0.0 £0.0 £5.3 £5.3
Civic Centre Site*  - - - -   
Total  £0.0 £0.0 £10.4 £17.2 £17.2 £20.5 £65.3
* Details on the expected leveraged invetsment at the Civic Centre site will be updated at FBC 
Financial risks are fully considered in Risk Register along with an assessment of how they will be
allocated and managed.   
56

Page 57

7
1.6 Management Case 
1.6.1 Project Roles and Responsibilities
The project will be delivered through SLC Enterprise and Sustainable Development Directorate.
The Council’s Legal and Procurement service will ensure that all the contractor/subcontractors and
consultant/sub-consultants engaged on the planning, design and delivery of the project comply
with statutory requirements.
Internal Project Governance Organogram 
1.6.2 Monitoring and Benefits Realisation
SLC is developing a City Deal monitoring and evaluation framework to ensure compliance with
PMO requirements for performance management.
Quarterly progress reporting on project development and delivery is provided by the City Deal
Programme Manager (Economy & Infrastructure) to the Programme Management Office via project
status reports and MA programme reports. Benefit realisation updates will also be provided on a
quarterly basis to adhere with the requirements of GCR City Deal, using the methodology set out in
the Benefit Tracking Template provided within the Assurance Framework.
57

Page 58

8
Project monitoring and evaluation is a key element of the appraisal process. The project will be
subject to a robust monitoring and evaluation programme, in line with the guidance set out in the
CD Assurance Framework and Green Book and led by the CD team set up by SLC.   
58

Page 59

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Outcome of Statutory Polling Scheme Review 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update to the Committee on the outcome of the recently concluded
statutory review of the Council’s Polling Scheme
 seek Committee’s approval to a revised Polling Scheme as set out in Appendix 1
to this report
[1purpose]
2. Recommendation(s)
2.1. The Council is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report, including the outcome of the statutory review of
the Council’s Polling Scheme, be noted;
(2) that the revised Polling Scheme as set out in Appendix 1 to this report be
approved; and
(3) that authority be delegated to the Chief Executive to take all steps necessary to
conclude matters relating to the statutory polling scheme review. 
3. Background
3.1. In terms of the Representation of the People Act 1983 (as amended), local
authorities are required to designate polling places for the purposes of elections, to
review those arrangements within the statutory review timescale and to keep their
arrangements under review. The Electoral Registration and Administration Act 2013
further amended the Representation of the People Act 1983 by introducing a change
to the timing of compulsory reviews of UK Parliamentary polling districts and polling
places with compulsory reviews to be started and completed within the period of 16
months that starts on 1 October of every fifth year after 1 October 2013. 
3.2. The Council completed its last statutory review in 2018, with there having been a
partial review in November 2023 to take account of the revised boundaries for the
three UK Parliament constituencies within South Lanarkshire following completion of
the UK Parliamentary Boundaries review in June 2023. In terms of the relevant
legislation, the Council must now complete the compulsory statutory review by 31
January 2025. In conducting its review, the Council must seek to ensure that: 
• all electors in the constituency have reasonable facilities for voting as are
practicable in circumstances; and 
• so far as is reasonably practicable all polling places should be accessible to
all voters including those who are disabled and when considering the
designation of a polling place the Council must have regard to the needs of
persons with disabilities. 
7
59

Page 60

3.3. In practical terms, the intention is to ensure the optimal facilities for voting in terms of
location, accessibility and capacity of available buildings, to support turnout in
electoral events and to support the public’s participation in the democratic process. 
3.4. On 11 September 2024, South Lanarkshire Council considered a report which
proposed the commencement of the required statutory review of the Polling Scheme.
In approving that report, the Council agreed to delegate authority to the Executive
Committee to consider a further report on the statutory Polling Scheme review on 11
December 2024, following completion of the public consultation exercise on the
review, and approve the Polling Scheme at conclusion of the review. 
3.5. In accordance with the timetable reported to South Lanarkshire Council on 11
September 2024 the Council has undertaken a public consultation exercise on the
review. This was carried out between 13 September 2024 and 1 November 2024,
and included publication of the notification of the review, information being made
available on the Council’s website, in public libraries, adverts placed in 4 local
newspapers and making contact with interested parties, including Elected Members,
MPs, MSPs, political parties, Community Councils, neighbouring local authorities,
the Electoral Registration Officer, owners/occupiers of proposed polling places and
organisations representing the disabled. Given the recent General Election,
feedback was also sought on the polling arrangements used for that, including from
polling staff and any feedback received from voters. 
3.6. The process for the review was also informed by Electoral Commission guidance on
conducting reviews. 
4. Outcome of Polling Scheme Review
4.1. The Council received 21 responses on the review from the consultation exercise. By
way of context, at the General Election in July 2024 the registered electorate for the
local authority area was 224,568.  Of these 21, they can be categorised as follows:-
• 10 responses raised no issues; 
• 4 responses expressed concerns over the proposed use of schools for Polling
Places (two in the context of the use of Udston Primary School and one in the
context of Kirklandpark Primary School);
• 1 raised an issue with signage at the entrance to a Polling Place which will be
picked up going forward, Blackwood Primary School;
• 2 made suggestions which the review is in agreement with, i.e. the continued
use of Braehead Hall and a return to the TACT Community Hall; and
• 4 raised points in connection with individual Polling Places and use of
Woodpark Primary School preferring to return to The Fountain (2 responses),
Wardlawhill Hall and St Mary’s Club Rooms, where no change is proposed. 
4.2. In addition to the consultation exercise, the Council also considered data on
population projections for South Lanarkshire from the National Records of Scotland
and input from the Council’s Planning Team in respect of potential housing
development over the next 5 years. In respect of the latter, the focus of housing
growth in the next 5 years is likely to be on the greenfield Community Growth Areas
which have been allocated in Local Development Plans since 2006 and on sites
within settlements where brownfield redevelopment opportunities are being built out.  
60

Page 61

4.3. This information has been factored into the review. In general terms, subject to the
changes proposed below, it has been assessed that the current Polling Scheme can
accommodate the current population and housing development projections,
recognising that there are a number of variables that will determine whether or not,
and to what extent, the population changes as predicted and whether proposed
developments are ultimately delivered. The Council will also continue to monitor this
across the local authority area, and where necessary conduct interim reviews of the
Polling Scheme in advance of planned electoral events, and where necessary
propose adjustments to the Scheme to take account of changes in local populations. 
4.4. The recent UK General Election held on 4 July 2024 has also provided a helpful
recent test of the current Polling Scheme. Feedback received at the time of the
election, and subsequently from those working at the election did not highlight any
material issues. 
4.5. The Polling Scheme currently has 147 Polling Places, of which 71 are Council
schools. It is recognised that the use of schools can impact upon the delivery of
education services by the Council. It should, however, be noted that the use of
schools for Polling Places in South Lanarkshire is well-established, and to mitigate
impact on senior school pupils and wider school communities the Council’s
secondary schools are not used. It must also be recognised that schools have
benefits over other potential Polling Places, in being owned by the Council, well
located, well maintained and more generally suitable in terms of accessibility. In
addition, the date for the next scheduled electoral event taking place in May 2026,
being the Scottish Parliament election, is to be an in-service day for all South
Lanarkshire Council’s schools, this having been considered by the Council’s
Education Resources Committee on 29 October 2024. 
4.6. As the Committee are aware, there are a number of Polling Places that were
previously under the control of South Lanarkshire Leisure and Culture, but have
recently been transferred to various community groups/organisations, or will shortly
be transferred.  Where these organisations are willing to continue to allow the venue
to be used as a Polling Place then, provided it remains suitable, it is proposed that
this continues. If, for whatever reason, that continued use was no longer practicable,
for instance the venue was reconfigured such that it was no longer suitable as a
Polling Place, then a suitable alternative would need to be identified. 
4.7. As previously reported to South Lanarkshire Council in September, the Second
Review of the constituencies and regions of the Scottish Parliament commenced on
1 September 2022, and is still ongoing. Boundaries Scotland plan to submit a report
to the Scottish Ministers by 1 May 2025. If subsequently approved by the Scottish
Parliament, the new boundaries will be effective at the next Scottish Parliament
election, expected in May 2026. If any changes to the Polling Scheme are required
as a result of this review, then that will be the subject of a future report to the
Council.  
61

Page 62

4.8. Taking the above into account, a revised Polling Scheme is included in Appendix 1
to this report. As regards the individual elements of this, there are some adjustments
proposed to merge Polling Districts which are now all within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections,
and some adjustments proposed to Polling Places too, all but one being to
accommodate the proposed adjustments to Polling Districts. The proposed changes
are set out in more detail in Appendix 2 to this report. By way of explanation, where
Polling Districts are proposed for merger then the proposed Polling Place is that
which is allocated the highest electorate from those within the Districts being
merged. 
4.9. Subject to the Committee’s decision it is recommended that authority is delegated to
the Chief Executive to take all steps necessary to conclude matters relating to the
review. This will include publication of the outcome on the Council’s website, and
advising key stakeholders. 
5. Employee Implications
5.1. There are no employee implications directly arising from this report. The proposals
will be delivered from existing resources. 
6. Financial Implications
6.1. There are no financial implications directly arising from this report. In terms of the
delivery of future electoral events, the costs of hiring polling places are, subject to
certain expenditure levels, met by the UK or Scottish Governments for all UK or
Scottish Parliamentary elections, with the Council only being required to meet those
costs for local government elections. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability and the environment
directly arising from this report. 
8. Other Implications
8.1. None. 
9. Integrated Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. However, under the Equality Act 2010, Returning Officers
have a duty to anticipate the needs of disabled voters and make reasonable
adjustments to remove substantial disadvantage for those voters. This means they
must take steps to understand and anticipate on an ongoing basis the needs of
disabled voters – with different types of disability, support and access requirements
within their area so that they can make informed decisions about how best to meet
these needs by making reasonable adjustments, including providing appropriate
equipment and support. This includes the selection of polling venues to ensure
accessibility. The process undertaken during the review enables the Returning
Officer and the Council to fulfils their duties in respect of this. 
9.2. It is to be noted that officers had already taken equalities considerations into account
in preparing the previous Scheme, and did so for the recent General Election. 
9.3. The consultation undertaken in respect of the statutory review has been summarised
in this report.   
62

Page 63

Jackie Taylor
Executive Director ( Finance and Corporate Resources) 
18 November 2024 
Link(s) to Council Values/Priorities/Outcomes
• Accountable, effective, efficient and transparent 
Previous References
• Report to Executive Committee 19 December 2018 - Review of Polling Districts and
Polling Places 2018  
• Report to South Lanarkshire Council 1 November 2023 - Review of UK
Parliamentary Constituencies Review of Polling Districts SL002 and SL007 
List of Background Papers
• South Lanarkshire Council 11 September 2024 - Statutory Polling Scheme Review 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Strachan, Head of Administration & Legal Services
Tel: 01698 454658
Email: iain.strachan@southlanarkshire.gov.uk 
63

Page 64

64

Page 65

Polling
district
Ward
numbe
r
Ward_Name Scottish parliament
constituency
Scottish
parliament region UK parliament constituency Polling place
Polling
Stations within
Polling Place
SL001 1 Clydesdale West Clydesdale South Scotland Motherwell, Wishaw and
Carluke Kirkton Primary School 1
SL002 1 Clydesdale West Clydesdale South Scotland Hamilton and Clyde Valley Crossford Hall 1
SL003 1 Clydesdale West Clydesdale South Scotland Motherwell, Wishaw and
Carluke
South Lanarkshire Lifestyles,
Carluke 1
SL004 1 Clydesdale West Clydesdale South Scotland Motherwell, Wishaw and
Carluke Crawforddyke Primary School 1
SL005 1 Clydesdale West Clydesdale South Scotland Motherwell, Wishaw and
Carluke Braidwood Primary School 1
SL006 1 Clydesdale West Clydesdale South Scotland Motherwell, Wishaw and
Carluke Law Primary School 1
SL007 2 Clydesdale North Clydesdale South Scotland Hamilton and Clyde Valley Lanark Primary School 2
SL008 2 Clydesdale North Clydesdale South Scotland Hamilton and Clyde Valley St Nicholas Parish Church
Hall 2
SL009 2 Clydesdale North Clydesdale South Scotland Hamilton and Clyde Valley St Mary's Club Rooms 2
SL010 2 Clydesdale North Clydesdale South Scotland Hamilton and Clyde Valley New Lanark Primary School 1
SL011 2 Clydesdale North Clydesdale South Scotland Hamilton and Clyde Valley Robert Owen Memorial
Primary School 2
SL012 2 Clydesdale North Clydesdale South Scotland Hamilton and Clyde Valley Kirkfieldbank Hall 2
SL014 2 Clydesdale North Clydesdale South Scotland Motherwell, Wishaw and
Carluke Auchengray Primary School 2
SL018 2 Clydesdale North Clydesdale South Scotland Motherwell, Wishaw and
Carluke Braehead Hall 1
SL019 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Biggar Municipal Hall 3
SL020 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Carnwath Primary School 2
SL021 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Crawford Hall 1
SL022 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Leadhills Hall 1
SL023 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Abington Primary School 1
SL024 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Symington Halll 3
SL027 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Blackmount Primary School 2
SL030 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Quothquan Hall 3
7
65

Page 66

SL031 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Carstairs Junction Hall 2
SL034 3 Clydesdale East Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Carstairs Community Centre 1
SL037 4 Clydesdale South Clydesdale South Scotland Hamilton and Clyde Valley Woodpark Primary School 2
SL038 4 Clydesdale South Clydesdale South Scotland Hamilton and Clyde Valley Woodpark Primary School 2
SL039 4 Clydesdale South Clydesdale South Scotland Hamilton and Clyde Valley Blackwood Primary School 4
SL042 4 Clydesdale South Clydesdale South Scotland Hamilton and Clyde Valley Brocketsbrae Hall 1
SL043 4 Clydesdale South Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Rigside Community Hall 1
SL044 4 Clydesdale South Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale St Bride's Centre 3
SL046 4 Clydesdale South Clydesdale South Scotland Dumfriesshire, Clydesdale
and Tweeddale Coalburn Leisure Complex 2
SL047 5 Avondale and Stonehouse Hamilton, Larkhall and
Stonehouse Central Scotland East Kilbride and Strathaven Stonehouse Primary School 5
SL049 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Gilmourton Primary School 1
SL050 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Kirklandpark Primary School 3
SL051 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Glassford Primary School 1
SL052 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Chapelton Primary School 1
SL053 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Auldhouse Primary School 1
SL054 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Wester Overton Primary
School 3
SL055 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Avendale Old Parish Church
Hall 2
SL056 5 Avondale and Stonehouse Clydesdale South Scotland East Kilbride and Strathaven Sandford Primary School 1
SL058 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven Ballerup Recreation Area
Pavilion 1
SL059 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven Greenhills Primary School 2
SL060 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven Castlefield Primary School 2
SL061 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven St Vincent's Primary School 3
SL062 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven Crosshouse Primary School 3
SL063 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven Greenhills Hall 1
SL064 7 East Kilbride Central South East Kilbride Central Scotland East Kilbride and Strathaven Canberra Primary School 3
SL065 7 East Kilbride Central South East Kilbride Central Scotland East Kilbride and Strathaven East Milton Primary School 3
SL066 7 East Kilbride Central South East Kilbride Central Scotland East Kilbride and Strathaven Heathery Knowe Primary
School 2
SL067 7 East Kilbride Central South East Kilbride Central Scotland East Kilbride and Strathaven Murray Primary School 3
SL068 7 East Kilbride Central South East Kilbride Central Scotland East Kilbride and Strathaven South Park Primary School 2
SL069 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven Maxwellton Primary
School/Greenburn School 3
SL070 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven Hunter Primary School 366

Page 67

SL071 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven Blacklaw Primary School 3
SL072 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven Kirktonholme Primary School 1
SL073 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven Kirktonholme Hall 2
SL074 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven Halfmerke Primary/West
Mains School 1
SL075 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven East Kilbride Old Parish
Church Hall 2
SL076 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven East Kilbride Arts Centre 2
SL077 8 East Kilbride Central North East Kilbride Central Scotland East Kilbride and Strathaven Mount Cameron Primary
School 1
SL078 9 East Kilbride West East Kilbride Central Scotland East Kilbride and Strathaven Stewartfield Community
Centre 2
SL079 9 East Kilbride West East Kilbride Central Scotland East Kilbride and Strathaven Mossneuk Primary School 5
SL080 9 East Kilbride West East Kilbride Central Scotland East Kilbride and Strathaven Crosshouse Primary School 1
SL081 9 East Kilbride West East Kilbride Central Scotland East Kilbride and Strathaven Thorntonhall Lawn Tennis
Club 1
SL082 9 East Kilbride West East Kilbride Central Scotland East Kilbride and Strathaven St Kenneth's Primary School 4
SL083 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven Long Calderwood Primary
School 4
SL085 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven St Leonard's Primary School 2
SL086 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven Calderwood Hall 1
SL087 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven St Hilary's Primary School 1
SL088 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven Claremont Parish Church Hall 2
SL089 10 East Kilbride East East Kilbride Central Scotland East Kilbride and Strathaven Whitlawburn Community
Resource Centre 1
SL091 11 Rutherglen South Rutherglen Glasgow Rutherglen Calderwood Primary School 3
SL092 11 Rutherglen South Rutherglen Glasgow Rutherglen Spittal Primary School 2
SL093 11 Rutherglen South Rutherglen Glasgow Rutherglen St Mark's Primary School 2
SL094 11 Rutherglen South Rutherglen Glasgow Rutherglen Fernhill Community Centre 3
SL095 11 Rutherglen South Rutherglen Glasgow Rutherglen Springhall Community Centre 2
SL096 11 Rutherglen South Rutherglen Glasgow Rutherglen Cathkin Primary School
(Community Wing) 2
SL097 12 Rutherglen Central and North Rutherglen Glasgow Rutherglen
Rutherglen West and
Wardlawhill Parish Church
Hall
1
SL098 12 Rutherglen Central and North Rutherglen Glasgow Rutherglen Bankhead Primary School 4
SL099 12 Rutherglen Central and North Rutherglen Glasgow Rutherglen Universal Connections 1
SL100 12 Rutherglen Central and North Rutherglen Glasgow Rutherglen Rutherglen West and
Wardlawhill East Church Hall 3
SL101 12 Rutherglen Central and North Rutherglen Glasgow Rutherglen Rutherglen United Reformed
Church Hall 2
SL102 12 Rutherglen Central and North Rutherglen Glasgow Rutherglen Burgh Primary School 167

Page 68

SL103 13 Cambuslang West Rutherglen Glasgow Rutherglen West Coats Primary School 4
SL104 13 Cambuslang West Rutherglen Glasgow Rutherglen Eastfield Community Centre 3
SL105 13 Cambuslang West Rutherglen Glasgow Rutherglen James Aiton Primary School 2
SL106 11 Rutherglen South Rutherglen Glasgow Rutherglen Burnside Blairbeth Parish
Church Hall 1
SL107 13 Cambuslang West Rutherglen Glasgow Rutherglen Whitlawburn Community
Resource Centre 5
SL108 14 Cambuslang East Rutherglen Glasgow Rutherglen North Halfway Community Hall 2
SL109 13 Cambuslang West Rutherglen Glasgow Rutherglen St Bride's Primary School
(Nursery Entrance) 1
SL110 14 Cambuslang East Rutherglen Glasgow Rutherglen St Charles' Primary School 3
SL111 14 Cambuslang East Rutherglen Glasgow Rutherglen Hallside Primary School 4
SL113 14 Cambuslang East Rutherglen Glasgow Rutherglen Flemington Hallside Church
Hall 2
SL115 14 Cambuslang East Rutherglen Glasgow Rutherglen Cairns Primary School 2
SL116 15 Blantyre Rutherglen Glasgow Rutherglen St Blane's Primary School 2
SL117 15 Blantyre Rutherglen Glasgow Rutherglen TACT Hall 2
SL118 15 Blantyre Rutherglen Glasgow Rutherglen TACT Hall 2
SL119 15 Blantyre Rutherglen Glasgow Rutherglen St Joseph's Primary School
(Nursery entrance) 1
SL120 15 Blantyre Uddingston and Bellshill Central Scotland Rutherglen St Joseph's Primary School
(Nursery entrance) 1
SL121 15 Blantyre Rutherglen Glasgow Rutherglen Auchinraith Primary School 3
SL123 15 Blantyre Rutherglen Glasgow Rutherglen High Blantyre Primary School 2
SL124 15 Blantyre Rutherglen Glasgow Rutherglen High Blantyre Public Hall 3
SL125 16 Bothwell and Uddingston Uddingston and Bellshill Central Scotland Rutherglen Bothwell Primary School 2
SL126 16 Bothwell and Uddingston Uddingston and Bellshill Central Scotland Rutherglen Bothwell Community Hall 3
SL127 16 Bothwell and Uddingston Uddingston and Bellshill Central Scotland Rutherglen St Bride's Primary School
(Bothwell) 2
SL128 16 Bothwell and Uddingston Uddingston and Bellshill Central Scotland Rutherglen Uddingston Community
Centre 2
SL129 16 Bothwell and Uddingston Uddingston and Bellshill Central Scotland Rutherglen Muiredge Primary School 2
SL130 16 Bothwell and Uddingston Uddingston and Bellshill Central Scotland Rutherglen Park Church 2
SL131 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St John's Primary School
(Hamilton) 1
SL132 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St Mary's Primary School
(Hamilton) 1
SL133 17 Hamilton North and East Uddingston and Bellshill Central Scotland Hamilton and Clyde Valley St Mary's Primary School
(Hamilton) 1
SL134 17 Hamilton North and East Uddingston and Bellshill Central Scotland Hamilton and Clyde Valley Whitehill Neighbourhood
Centre 368

Page 69

SL135 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Glenlee Primary School 3
SL136 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley South Lanarkshire Council
Office 1
SL137 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley South Lanarkshire Council
Office 1
SL138 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Woodside Primary School 2
SL139 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St John's Church Centre 1
SL140 17 Hamilton North and East Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Ferniegair Community Hall 2
SL141 18 Hamilton West and Earnock Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Udston Primary School 4
SL142 18 Hamilton West and Earnock Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Townhill Primary School 4
SL143 18 Hamilton West and Earnock Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Hillhouse and Earnock
Community Centre 5
SL145 18 Hamilton West and Earnock Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St Peter's Primary School 4
SL147 18 Hamilton West and Earnock Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St John's Primary School
(Hamilton) 1
SL148 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley South Lanarkshire Lifestyles,
Fairhill 3
SL150 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Woodhead Primary School 3
SL152 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Eddlewood Public Hall 2
SL154 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Chatelherault Primary School 3
SL155 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Our Lady and St Anne's
Primary School 3
SL156 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St Elizabeth's Primary School
(Side entrance) 2
SL157 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley St John's Primary School
(Hamilton) 2
SL158 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Glengowan Primary School 3
SL159 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Dalserf Primary School
(Community Wing) 2
SL160 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Dalserf Parish Church Hall 1
69

Page 70

SL161 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Netherburn Community Hall 1
SL162 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Machanhill Primary School 3
SL163 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Trinity Parish Church Hall 3
SL164 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Hareleeshill Primary School
(Community Wing) 2
SL166 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Craigbank Primary School
(Community Wing) 3
SL167 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Quarter Primary School 1
SL168 20 Larkhall Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Stonehouse Primary School 1
SL169 6 East Kilbride South East Kilbride Central Scotland East Kilbride and Strathaven Alistair McCoist Complex 2
SL170 9 East Kilbride West East Kilbride Central Scotland East Kilbride and Strathaven Mossneuk Parish Church 1
SL171 14 Cambuslang East Rutherglen Glasgow Rutherglen St Charles' Primary School 4
SL172 6 East Kilbride South Clydesdale South Scotland East Kilbride and Strathaven Crosshouse Primary School 1
SL175 17 Hamilton North and East Rutherglen Glasgow Hamilton and Clyde Valley Auchinraith Primary School 1
SL177 19 Hamilton South Hamilton, Larkhall and
Stonehouse Central Scotland Hamilton and Clyde Valley Woodhead Primary School 1
70

Page 71

APPENDIX 2 – PROPOSED AMENDMENTS TO CURRENT POLLING SCHEME 
Ward 2 - Clydesdale North – Changes Proposed
The following Polling Districts and Polling Places in Ward 2 meet the stated criteria and
therefore no change is proposed:- 
Polling District Reference:  SL007 Polling Place:  Lanark Primary School
Polling District Reference:  SL008 Polling Place:  St Nicholas Parish Church Hall
Polling District Reference: SL009 Polling Place:  St Mary’s Clubrooms
Polling District Reference:  SL010 Polling Place:  New Lanark Primary School
Polling District Reference:  SL011 Polling Place:  Robert Owen Memorial Primary
School
Polling District Reference:  SL018 Polling Place:  Braehead Hall 
The following changes are, however, proposed:- 
• Polling Districts SL012, SL013 and SL016 are proposed to merge as all are now
within the same constituency for UK Westminster, Scottish Parliament and South
Lanarkshire Council elections.  The Polling Place is proposed to remain as
Kirkfieldbank Hall, currently used for SL012 and 13. SL012 to remain, with SL013
and SL016 being removed. Nemphlar Hall would no longer be used. 
• Polling Districts SL014 and SL015 proposed to merge as all now within the same
constituency for UK Westminster, Scottish Parliament and South Lanarkshire Council
elections.  Polling place to remain as Auchengray Primary School, currently used for
SL015 and can accommodate another station being added. Tarbrax Village Hall
currently used for SL014 would no longer be used. SL014 to remain, with 015 being
removed. 
Ward 3 - Clydesdale East – Changes Proposed
The following Polling Districts and Polling Places in Ward 3 meet the stated criteria and
therefore no change is proposed:- 
Polling District Reference:  SL019 Polling Place:  Biggar Municipal Hall
Polling District Reference:  SL021 Polling Place:  Crawford Hall
Polling District Reference:  SL022 Polling Place:  Leadhills Hall
Polling District Reference:  SL023 Polling Place:  Abington Primary School 
Polling District Reference:  SL034 Polling Place:  Carstairs Community Centre 
The following change are, however, proposed:- 
• Polling Districts SL020 and SL026 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections. 
Polling place to remain Carnwath Primary School. SL020 to remain with SL026 being
removed.    
7
71

Page 72

• Polling Districts SL024, SL025 and SL029 to merge as all now within the same
constituency for UK Westminster, Scottish Parliament and South Lanarkshire
Council elections.  Polling place remaining as Symington Hall for electors who were
previously in SL029.  SL024 to remain with SL025 and SL029 being removed.
Coulter Hall would no longer be used. 
• Polling Districts SL027 and SL028 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections.
SL027 to remain with SL028 being removed.  Blackmount Primary School to remain
as the Polling Place. 
• Polling Districts SL030, SL032 and SL033 to merge as all now within the same
constituency for UK Westminster, Scottish Parliament and South Lanarkshire
Council elections. Polling place remaining as Quothquan Hall for electors who were
previously in SL033.  SL030 to remain with SL032 and SL033 being removed.
Thankerton Hall and Carmichael Hall would no longer be used. 
• Polling Districts SL031 and SL035 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections. 
SL031 to remain with SL035 being removed. Carstairs Junction Hall to remain as the
Polling Place, with Pettinain Hall no longer being used. 
Ward 4 - Clydesdale South – Changes Proposed
The following Polling Districts and Polling Places in Ward 4 below meet the stated criteria 
Polling District Reference: SL037 Polling Place Woodpark Primary School
Polling District Reference:  SL038 Polling Place:  Woodpark Primary School
Polling District Reference:  SL042 Polling Place:  Brocketsbrae Hall
Polling District Reference:  SL043 Polling Place:  Rigside Community Hall
Polling District Reference:  SL046 Polling Place:  Coalburn Leisure Complex 
The following changes are, however, proposed:- 
• Polling Districts SL039, SL040 and SL041 proposed to merge as all now within the
same constituency for UK Westminster, Scottish Parliament and South Lanarkshire
Council elections . Polling Place proposed to remain as Blackwood Primary. SL039
to remain with  SL040 and SL041 being removed. 
• Polling Districts SL044 and SL045 proposed to merge as all now within the same
constituency for UK Westminster, Scottish Parliament and South Lanarkshire
Council elections.  SL044 to remain with SL045 being removed.  Polling Place to
remain as St Brides Centre, with Glespin Community Hall no longer being used.    
72

Page 73

Ward 5 - Avondale and Stonehouse – Changes Proposed
All the following Polling Districts and Polling Places in Ward 5 meet the stated criteria and
therefore no change is proposed:- 
Polling District Reference:  SL049 Polling Place:  Gilmourton Primary School 
Polling District Reference:  SL050 Polling Place:  Kirklandpark Primary School
Polling District Reference:  SL051 Polling Place:  Glassford Primary School
Polling District Reference:  SL052 Polling Place:  Chapelton Primary School
Polling District Reference:  SL053 Polling Place:  Auldhouse Primary School
Polling District Reference:  SL054 Polling Place:  Wester Overton Primary School
Polling District Reference:  SL055 Polling Place:  Avendale Old Parish Church Hall
Polling District Reference:  SL056 Polling Place:  Sandford Primary School 
The following changes are, however, proposed:- 
• Polling Districts SL047 and SL048 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections.
Polling place to remain Stonehouse Primary School. SL047 to remain with SL048
being removed. 
Ward 13 - Cambuslang West – Changes Proposed
The following Polling Districts and Polling Places in Ward 13 below meet the stated criteria
and therefore no change is proposed:- 
Polling District Reference:  SL103 Polling Place:  West Coats Primary School
Polling District Reference:  SL104 Polling Place:  Eastfield Community Centre
Polling District Reference:  SL105 Polling Place:  James Aiton Primary School
Polling District Reference:  SL109 Polling Place:  St Bride's Primary School 
The following change is, however, proposed:- 
• Polling Districts SL107 and SL176 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections,
Whitlawburn Community Resource Centre to remain as the Polling Place with
Burnside Blairbeth Parish Church Hall no longer being used. SL107 to remain with
SL176 being removed. 
Ward 14 - Cambuslang East – Changes Proposed
The following Polling Districts and Polling Places in Ward 14 below meet the stated criteria
and therefore no change is proposed:- 
Polling District Reference:  SL108 Polling Place:  North Halfway Community Hall
Polling District Reference:  SL111 Polling Place:  Hallside Primary School
Polling District Reference:  SL113 Polling Place:  Flemington Hallside Church Hall
Polling District Reference:  SL115 Polling Place:  Cairns Primary School
Polling District Reference:  SL171 Polling Place:  St Charles’ Primary School 
The following change is, however, proposed:- 
• Polling Districts SL110 and SL112 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections, St
Charles Primary School to remain as the Polling Place and Caledonian Centre no
longer being used. SL110 to remain with SL112 being removed.
73

Page 74

Ward 15 – Blantyre – Changes Proposed
The following Polling Districts and Polling Places in Ward 15 below meet the stated criteria
and therefore no change is proposed:- 
Polling District Reference:  SL116 Polling Place:  St Blane's Primary School
Polling District Reference:  SL119 Polling Place:  St Joseph's Primary School   
(Nursery) 
Polling District Reference:  SL120 Polling Place:  St Joseph's Primary School   
(Nursery)
Polling District Reference:  SL123 Polling Place:  High Blantyre Primary School
Polling District Reference:  SL124 Polling Place:  High Blantyre Public Hall 
The following change is, however, proposed:- 
• Polling Districts SL117 and SL118 no change is proposed to the Polling Districts, but
as regards the Polling Places it is noted that the TACT Community Hall was closed
due to ongoing works during the UK Parliamentary General Election and David
Livingston Primary School was used as a replacement Polling Place.  It is proposed
that these two Polling Districts revert back to TACT Community Hall as the Polling
Place.
• Polling Districts SL121 and SL122 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections
with Auchinraith Primary School remaining as the Polling place.  SL121 to remain
with SL122 being removed. 
Ward 17 - Hamilton North and East – Changes Proposed
The following Polling Districts and Polling Places in Ward 17 below meet the stated criteria
and therefore no change is proposed:- 
Polling District Reference:  SL131 Polling Place:  St John's Primary School
Polling District Reference:  SL132 Polling Place:  St Mary's Primary School,    
Hamilton
Polling District Reference:  SL133 Polling Place:  St Mary's Primary School,    
Hamilton
Polling District Reference:  SL134 Polling Place:  Whitehill Neighbourhood Centre
Polling District Reference:  SL135 Polling Place:  Glenlee Primary School
Polling District Reference:  SL136 Polling Place:  South Lanarkshire Council
Offices
Polling District Reference:  SL137 Polling Place:  South Lanarkshire Council
Offices
Polling District Reference:  SL139 Polling Place:  St John’s Church Centre
Polling District Reference:  SL140 Polling Place:  Ferniegair Community Hall
Polling District Reference:  SL175 Polling Place:  Auchinraith Primary School 
74

Page 75

Ward 18 - Hamilton West and Earnock – Changes Proposed
The following Polling Districts and Polling Places in Ward 18 meet the stated criteria and
therefore no change is proposed:- 
Polling District Reference:  SL141 Polling Place:  Udston Primary School
Polling District Reference: SL142  Polling Place: Townhill Primary School
Polling District Reference:  SL147 Polling Place:  St John's Primary School 
The following change is, however, proposed:- 
• Polling Districts SL143 and SL144 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections,
Polling station proposed is Hillhouse and Earnock Community Centre.  SL143 to
remain withSL144 being removed. 
• Polling Districts SL145 and SL146 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections. St
Peter’s Primary School would remain as the Polling Place.  SL145 to remain with
SL146 being removed. 
Ward 19 - Hamilton South – Changes Proposed
The following Polling Districts and Polling Places in Ward 19 meet the stated criteria and
therefore no change is proposed:- 
Polling District Reference:  SL138 Polling Place:  Woodside Primary School
Polling District Reference:  SL150 Polling Place:  Woodhead Primary School
Polling District Reference:  SL154 Polling Place:  Chatelherault Primary School
Polling District Reference:  SL155 Polling Place:  Our Lady and St Anne's Primary
School
Polling District Reference:  SL156 Polling Place:  St Elizabeth's Primary School     
(side entrance)
Polling District Reference:  SL157 Polling Place:  St John's Primary School
Polling District Reference:  SL177 Polling Place:  Woodhead Primary School 
The following changes are, however, proposed:- 
• Polling Districts SL148 and SL149 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections. 
Polling place to remain as South Lanarkshire Lifestyles, Fairhill.  SL148 to remain
with SL149 being removed. 
• Polling District SL152 and SL153 to merge as all now within the same constituency
for UK Westminster, Scottish Parliament and South Lanarkshire Council elections. 
Polling place to remain as Eddlewood Public Hall.  SL152 to remain with SL153
being removed. 
75

Page 76

76

Page 77

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject:  Council Motion - Keep the Beat Alive 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Executive Committee with an update on the position regarding the
actions within the Council motion ‘Keep the Beat Alive’, passed at the Council
meeting on 12 June 2024
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report are noted; and
(2) the proposed position in relation to the requirements of the Third Sector Fair
Funding Charter and the actions to be taken to support it, as outlined in
Appendix 2, are agreed.
[1recs]
3. Background
3.1. The Third Sector is diverse and is made up of many different types of organisations
ranging from completely informal, voluntary led community activity groups, to local,
small to medium service providers and larger nationally organised providers of
services with local branches and activities.  Some, but not all of the third sector, are
charities, most are constituted in some way, and many are fully incorporated.  The
Third Sector’s income can come from a mixture of sources including earned income,
fundraising, donations and/ or grants.  This wide range of organisations have
different interests and aims when it comes to funding and sustainability. 
3.2. Council Resources recognise the important role of the Third Sector in South
Lanarkshire in the delivery of important services and valuable support that is
provided to communities by them through the range of activities they are engaged in. 
However, the Council’s ability to support the sector in the future through the
provision of grants or through procurement activity is limited because of the funding
pressures impacting public services. In addition, any activity needs to work within the
legal and regulatory framework within which the Council operates. 
3.3. A Third Sector Process review is underway focussing on the governance
arrangements in place around grant funding and the value obtained by the Council
from their provision.  This review will highlight areas of practice to address in more
detail relating to the asks of the Third Sector. 
8
77

Page 78

4. Council Motion
4.1. A motion was presented to the Council meeting on 12 June 2024 to recognise the
role played by the Third Sector in South Lanarkshire supported by a new campaign
called Keep the Beat Alive. 
4.2. The motion requested South Lanarkshire Council take forward 5 actions; 
1. promotion of the sector’s impact;
2. endorsement of the principles of the Third Sector Fair Funding Charter;
3. engagement with VASLAN on implementation of the Charter;
4. engage meaningfully by inviting the sector to be in the room at an early enough
stage; and
5. convene a meeting with the Council, South Lanarkshire Third Sector and the
Scottish Government Minister to share the campaign and discuss the need for
national action. 
4.3. Update on progress against each of the actions from the motion is provided in
Appendix 1 and summarised below:
 Action 1: The impact report and videos produced by VASLAN and Third sector
organisations have been widely circulated.
 Action 2: This action is considered complete given the passing of the motion.
 Action 3: Across the asks of the Third Sector Funding Charter, there are areas
where there are opportunities for providing greater support to the sector (e.g.
procurement training from Supplier Development Programme (SPD) and in
reviewing guidance for the provision of grants).  However, scope to provide
assurances around future funding levels is limited given the current financial
environment.  Further detail on this is provided in section 5 of the report and in
Appendix 2.
 Action 4: Engagement with the Third Sector at an early stage is one of the
elements of the Fair Funding Charter included under action 3 and is considered
as part of the overall review of the Third Sector Funding Charter.
 Action 5: At the request of the Cabinet Secretary, an introductory meeting took
place with members of the working group the Scottish Government Third Sector
Unit on 15 August 2024.  A further officer meeting is to be arranged with the
attendance of VASLAN. 
4.4. The minute of the meeting of Council from 12 June 2024 noted a report was to be
submitted to a future meeting of the Executive Committee with the outcome of the
detailed consideration and discussion with VASLAN on the Third Sector Fair Funding
Charter (action 3). This outcome of this activity is outlined in more detail in section 5. 
5. Third Sector Fair Funding Charter
5.1. The Third Sector Fair Funding Charter is a funding charter developed by the TSI
(Third Sector Interface) Scotland Network and Scottish Council for Voluntary
Organisations (SCVO), that sets out 4 fair funding principles for the third sector with
the aim of supporting improvements in the funding the sector receives from the
public and independent sectors.  
78

Page 79

5.2. The 4 principles of the Charter are:
 A Strategic Investment Approach 
 Accessible, Proportionate and Transparent Funding and Commissioning
Processes 
 Adequate and Secure Funding 
 Proportionate Evaluation and Reporting to Funders 
5.3. Appendix 2 provides a position across each of the requirements of the Third Sector
Fair Funding Charter. For each requirement a proposed position is presented
together with actions that can be taken forward in support of the individual
requirements. 
5.4. Overall, the Council is complying with many elements of the Charter either in full or
in part. There are some limitations in the ability of the Council to meet the full
requirements of the Charter (e.g. the provision of inflationary funding over a medium
term) and these are detailed in Appendix 2.   
5.5. Appendix 2 also outlines the actions that can be taken to further support the sector
including building on existing processes and activities including:
 To update service review guidance to emphasise the need for Third Sector
involvement in review activity as part of wider engagement activity.  The current
reviews will be asked to consider this where possible, and the guidance will be
updated for future reviews.
 To develop bespoke training via the SDP in relation to procurement regulations.  
 To progress a range of improvements to the approach for providing grants
including:
 evaluation and reporting arrangements will be examined as part of the
Third Sector Process review.
 consideration of a sliding scale for covering the cost of overheads for the
Third Sector based on project value as part of the Third Sector Process
review. 
 to address the provision and adequacy of funding recognising the financial
challenges being experienced by the council and how it may impact
funding decisions.
 to consider how the provision of full cost recovery can be delivered while
ensuring Best Value and the different organisational structures used
across the Third Sector. 
5.6. The Motion required Council officers to engage with VASLAN on the ask of the Fair
Funding Charter. The opportunities presented by the Fair Funding Charter have,
therefore, been discussed with VASLAN. In addition, the challenges for the Council
in meeting the individual requirements of the Charter have been explained,
principally around procurement and finance.   
5.7. VASLAN are keen to see an output from the engagement with the Council and it is
expected Appendix 2 will provide this.   
6. Employee Implications
6.1. A short-term working group consisting of Head of Finance (Transactions), Legal
Services Advisor, Community Engagement Manager and Economic Development
Officer was established to assess the extent to which the requirements of the Fair
Funding Charter can be met. 
79

Page 80

7. Financial Implications
7.1. There are no financial implications from the actions described in Appendix 2.   
8. Other Implications
8.1. There is a risk the financial challenges facing the Council results in less certainty
around funding provided to the Third Sector. 
9. Integrated Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
27 November 2024 
Link(s) to Council Values/Priorities/Outcomes
▪ Accountable, effective, efficient and transparent
▪ Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Craig Fergusson, Head of Finance (Transactions) 
Ext: 4951   (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
80

Page 81

Appendix 1
Third Sector Funding Charter
Motion Actions 
Action Update
Action 1: Recognise the sector’s impact by
sharing the impact report and videos widely
internally and externally and continue to provide
opportunities to showcase the impact and
campaign with elected members and senior
officers.
The impact report and videos have been widely circulated to demonstrate the value of 
the sector in South Lanarkshire to the following groups:
o Council Extended Management Team
o Procurement Network
o Providing space for the campaign in various forums/meetings (e.g. area
committees)
o Social media
Keep The Beat Alive - South Lanarkshire -Keep The Beat Alive
Action 2: Endorse the principles of the Third
Sector Fair Funding Charter which calls for a) A
Strategic Investment Approach b) Accessible,
Proportionate and Transparent Funding and
Commissioning Processes c) Adequate and
Secure Funding and d) Proportionate Evaluation
and Reporting to Funders but noting the
financial challenges facing the Council and need
for the Council to comply with its legal and
regulatory framework.
This action is considered complete given the passing of the motion. 
Action 3: Agree that relevant officers meet with
VASLAN, as campaign representatives, to
explore how the council can implement as much
of the Third Sector Fair Funding Charter as it
can within the scope of its legal and regulatory
framework, with a report to be submitted to a
future meeting of the Executive Committee with
the outcome of this detailed consideration and
discussion. 
Three meetings have been held with the Chief Executive of VASLAN to discuss the
elements of the Fair Funding Charter. 
In summary, there are areas where there are opportunities for providing greater support
to the sector (e.g. procurement training from Supplier Development Programme (SPD)
and in reviewing guidance for the provision of grants). However, scope to provide
assurances around future funding levels is limited given the current financial
environment. Further detail on this is provided in section 5 of the report and in Appendix
2. 
Action 4: Engage meaningfully by inviting the
sector to be in the room at an early enough
This is one of the elements of the Fair Funding Charter included under action 3.
81

Page 82

stage, maximising opportunities for
commissioning, collaboration, external funding,
service reviews/design and local community
planning, all to best meet shared outcomes for
our communities, where the same is appropriate
and in accordance with the Council’s legal and
regulatory framework. 
Action 5: Write to the Scottish Government 
Minister responsible for the Third Sector to 
convene a meeting with the council, South 
Lanarkshire Third Sector and the Minister to 
share the campaign and discuss the need for 
national action to support the campaign asks”.
At the request of the Cabinet Secretary, an introductory meeting took place with 
members of the working group the Scottish Government Third Sector Unit on 15 August. 
Officers presented an overview of the work done to date covering the Council Motion, 
the challenges being identified around procurement and funding and potential areas 
of opportunity. Scottish Government highlighted areas of good practice, resources 
available to the Third Sector and experiences of other councils. They also advised of 
their review of the SG grant process with the aim of making it a proportionate as 
possible. 
A further officer meeting is to be arranged with the attendance of VASLAN. 
o  
82

Page 83

Appendix 2
Third Sector Funding Charter 
Charter Ask Position   Actions  Responsibility /
Timescale
1. A Strategic Investment Approach 
Pro-active, recurring and co-produced consultation and
consideration as to whether certain public services could
be effectively delivered by the third sector directly or in
partnership with the public sector. Resource allocation
decisions can be identified through effective public
engagement and community planning processes, which
must include third sector organisations.
Resourcing decisions are not made in
community planning, they are made in
individual services or theme specific
partnerships.   
To update service review
guidance to emphasise the
need for Third Sector
involvement in review activity
as part of wider engagement
activity. 
Head of Personnel – 31
December 2024
An appropriate commissioning process in accordance
with Principle Two – which, depending on the
circumstances, may involve different approaches such as:
+ open, transparent commissioning (either through
tenders or grant awards); + joint, partnership, or
collaborative commissioning involving several parties; +
direct commissioning from an identified provider to meet
specific, unique requirements 
The council already has in place
appropriate commissioning arrangements
for contracts. 
The expectation is that there will be fewer 
opportunities in social care; and where we 
will procure services from the third sector, 
it will be for clearly and tightly prescribed 
provision.
To develop bespoke training via
the SDP in relation to
procurement regulations. Any
cost would be met by the Third
Sector.   
To highlight to the Scottish
Government the benefits from
expanding scope of light touch
regime to contracts regulated
by the Public Reform (S) Act
and regs. Light touch only
applies to contracts where
value exceeds £ 663,540 
Supplier Development
Programme – 31
January 2025 
Head of Finance
(Transactions) – 31
January 2025
Service users/beneficiaries are involved in co-designing
and evaluating the commissioned service or activity; 
Service reviews can often involve a level
of consultation with service users around
current service delivery and options
appraisal. The level of engagement would
likely vary by review. 
The Council is entitled to conduct market
consultation with a view to preparing for a
procurement exercise. This can involve
independent expert or market participants
including those from the Third Sector. 
To better emphasise the links
from what are expressed
through existing processes and
what we formally bring forward
into proposals/reviews. 
All Resources – from 1
January 2025
83

Page 84

Appropriate evaluation and reporting arrangements are
agreed to provide accountability to the funder and the
public, in accordance with Principle Three. 
This is being investigated as part of the
Third Sector Process review. Reporting
and evaluation of Third Sector activity
should be used, and we should have a
greater emphasis on clear metrics. 
Improvements in evaluation
and reporting arrangements to
be considered as part of the
Third Sector Process review. 
Community
Engagement Manager –
31 July 2025
Ongoing learning is supported to inform improvements to
the commissioned service, and more widely 
Service users require to be an integral
part of continuous improvement cycles.
Procuring Resources will review contract
performance to inform future
requirements.
To update service review
guidance to emphasise the
need for service user
involvement in review activity. 
Head of Personnel – 31
December 2024
The funding provided is sufficient and secure in
accordance with Principle Three 
It is recognised three-year funding cycles
for grants are the gold star standard for
grant funding. However, the significant
funding challenges in local government is
a limiting factor. 
Grant funding is an area where greater
definition should be provided, and this
may identify scope to be more responsive
within communities.
To investigate the provision of
grant funding as part of a Third
Sector Process review. This will
recognise the financial
challenges being experienced
by the council and how it may
impact funding decisions. 
Community
Engagement Manager –
31 July 2025
2. Accessible, Proportionate and Transparent Funding and Commissioning Processes  
funding and commissioning opportunities are publicised
appropriately. 
We publish procurement strategy and
annual procurement report which
identifies future tendering opportunities.
Social media is also used to promote
more locally. 
There are a range of promotional activities
already identified in the Community
Wealth Building Spend Pillar action plan.
The approach to the publication
of grant funding opportunities
will be considered as part of
the Third Sector Process
review.
Community
Engagement Manager –
31 July 2025
clear guidance is available on what is required for funding
applications, service proposals or bids 
Not all grant programmes are providing
adequate guidance within the council. 
From a procurement perspective, clear
guidance is issued as part of tender
documents as to how tenders will be
evaluated and how decisions are made to
award a contract.
The provision of guidance on
the requirements for funding
applications will be considered
as part of the Third Sector
Process review.
Community
Engagement Manager –
31 July 2025
information on how and when decisions will be made is
provided 
As above.  As above.  Community
Engagement Manager –
31 July 2025
84

Page 85

funding applications or proposals only require a level of
detail proportionate to the funding – for example, smaller
funding awards requiring less detailed applications 
The level of detail for smaller grants is
considered proportionate, however there
are inconsistencies in the level of detail
required for medium to larger grants. If a
grant is externally funded the level of
detail required will depend on what
conditions are included in our grant
awards. In addition, given the need to
secure Best Value there will always be a
minimum level of detail required.
To consider the level of detail
for smaller grants as part of the
Third Sector Process review to
ensure it is proportionate where
possible.
Community
Engagement Manager –
31 July 2025
sufficient time between the opening and closing dates to
allow organisations time to prepare and submit their
applications, proposals or bid 
Sufficient time is provided subject to the
needs of the specific exercise,
acknowledging late notification of funding
awards can impact timescales. For
procurement activity, the length of time
provided is covered by the procurement
regulations. 
To consider the length of time
provided as part of the Third
Sector review.
Community
Engagement Manager –
31 July 2025
clear processes for managing the end of contracts; giving
three months’ notice if funding is not to be continued. This
allows for fair and effective workforce planning 
Contract expiry dates are advised at the
point of award. Contract extension should
be exercised giving notice required in
terms of the contracts. In contracts there
should be regular dialogue during the
contract period. 
To ensure reasonable notice is
provided wherever possible
and in compliance with contract
terms. 
All Resources – from 1
January 2025
3. Adequate and Secure Funding  
sufficient to cover the full costs of the agreed work,
including legitimate overhead costs and provision for
annual increases in line with inflation; or an agreed
contribution to the cost of the work if they are not the sole
funder 
Bidders are usually expected to take
account of overheads and inflation when
bidding. However, revenue items are
ineligible for some funding programmes. 
To provide guidance as part of
the Third Sector Process
review that can assist in
ensuring consistency of
approach and fairness. 
The scale of the work required
for individual projects can be
reviewed to identify scope to
ensure funding will cover the
eligible costs of the agreed
work reflecting any wider
guidance that may be put in
place. 
Community
Engagement Manager –
31 July 2025
built on the principle of full cost recovery. Full cost
recovery means recovery all the costs involved in running
a project – e.g. direct costs such as staffing and indirect
In principle, it seems reasonable for an
organisation to routinely cover its direct
costs. It may be necessary to review
To consider how the provision
of full cost recovery can be
delivered while ensuring Best
Community
Engagement Manager –
31 July 2025
85

Page 86

costs such as a proportion of the organisation’s
overheads. Funders should fund all direct and
proportioned indirect costs that an organisation faces.
Where there is a cap on the level of FCR we would
encourage 20% 
expected outputs from grant activity to
help provide support here. The level of
support for indirect costs should be
proportionate to the overall level of
funding. However, cash is limited, and full
cost recovery may not be affordable. 
The Council is obliged to secure Best
Value and might struggle to do so were it
obliged to fund services on that basis
when other parties might be able to
deliver the required level of service but at
a lower cost. Would also need to consider
the subsidy control provisions.  
Value and the different
organisational structures used
across the Third Sector. 
(linked to above statement) which is to be understood as
representing 20 per cent of a contract’s value so that we
can reflect priorities such as the Real Living Wage, Fair
Work and any winding up costs 
This supports many other policies of
community wealth building, tackling
poverty and employability. However, it is
for an organisation to price for service
delivery taking account of SG
expectations of payment of real living
wage and delivery of fair work first. The
council is not funded for the provision of
RLW across all contracts. 
It is not for the Council as funder to cover
any costs associated with winding up.
To consider a sliding scale for
overheads based on project
value as part of the Third
Sector Process review. This
may be subject to a cap.
Community
Engagement Manager –
31 July 2025
(funding is) of sufficient duration, for example: + at least
three years for “core” grant funding and delivery of
ongoing services OR + for the duration of fixed-term
projects and activities 
The financial challenges being
experienced by the Council limits the level
of funding available and therefore the
level of commitment that can be provided. 
Councils receive notification of core
funding on an annual basis. 
N/A N/A
4. Proportionate Evaluation and Reporting to Funders 
The funding award should cover evaluation and reporting
costs in addition to delivery costs.
It is recognised the evaluation and
reporting activities attached to grant
funding are important part of the
governance arrangements and should be
covered by grant award where possible. 
To consider requirements as
part of the Third Sector
Process review. 
Community
Engagement Manager –
31 July 2025
86

Page 87

Evaluation and reporting requirements should be
proportionate to the level of funding provided, with smaller
awards requiring less in-depth reporting 
It is recognised that in circumstances
when the council is in receipt of the core
funder, the ability to scale back evaluation
and reporting requirements may be
limited. 
To consider requirements as
part of the Third Sector
Process review. 
Community
Engagement Manager –
31 July 2025 
87

Page 88

88

Page 89

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: 2025/2026 Budget Update - COSLA Lobbying
Document 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the COSLA Lobbying Document released in November
2024, and provide a summary of its contents.
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the COSLA Lobbying Document, summarised in section 4, be noted.   
3. Background
3.1. In November 2024, COSLA launched its Budget Lobbying Campaign entitled ‘Invest
Locally in Scotland's Future’.  A copy of the campaign document can be found here. 
This report will provide members with a summary of the document (section 4). 
4. COSLA Lobbying Document – Summary
4.1. The COSLA website states that ‘The Accounts Commission have projected a Local
Government budget gap of £392.7 million in 2025/2026, rising to a cumulative gap of
£780 million by 2026/2027.  In the face of a series of national and local challenges,
Local Government cannot afford a repeat of last year’s flat cash revenue settlement
and the £54m cut to core capital budget. 
4.2. The latest campaign from COSLA, ‘Invest Locally in Scotland’s Future’, calls on the
Scottish Government to provide Local Government with fair and flexible funding in the
upcoming Scottish Budget, to allow our councils to continue to provide vital services,
and to ensure a range of positive impacts for individuals, communities, and Scotland
as a whole. 
4.3. The local government ‘asks’ set out in the document are summarised:- 
 Fair and Flexible Funding 
Adequate funding is required to ensure the continuation of services 
 Workforce Capacity and recruitment 
Shared national challenges require a skilled workforce  
9
89

Page 90

 No Council Tax Freeze 
Council tax should be a decision for local authorities 
 Prevention and Upstream Investment
Adopt a renewed focus on prevention and upstream investment to address
demand challenges 
 Capital
Additional capital investment is vital as a lack of investment produces poorer
outcomes across communities 
 Tackle the Housing Emergency
Reinstatement of the reduction to Affordable Housing Programme funding. Good
quality affordable housing is a key determinant of health and wellbeing 
 UK Government Funding
It is crucial that the Sottish Government passes on a fair share of the additional
funding for revenue and capital made available through the Barnett
Consequentials 
 Support Social Care 
Local Government must receive fair funding to support social care services in the
face of increasing pressures 
 Verity House Agreement
Spending decisions must align with the Verity House Agreement. The Budget
must provide Local Government with funding which is sustainable, and multi-
year, with no ring-fencing 
4.4. The document also provides commentary  around how councils sit at the heart of
communities , providing everyday services crucial to “living well locally”.  It also sets
out our national and local challenges including health inequalities, aging population,
poverty and climate change. 
4.5. Local Investment and Local empowerment are also themes withing the document –
asking that the cycle of reduced spending is broken to unlock the local potential that
councils have. 
4.6. Key Figures – Revenue:  The document notes that for Revenue, 2024/2025 was a
flat cash Settlement, and that local government cannot afford another flat cash
Settlement.  The impact of new burdens not fully funded by the Scottish Government,
combined with rising pay and operational costs, as well as ever-increasing demand
for services, requires a fully funded Local Government.  The document notes a
request for Revenue funding totalling £14,573 million.  This is to meet the 2024/2025
Revenue Settlement plus policy commitments plus a 5% increase. 
4.7. The document notes the changes to employers’ national insurance contributions
which is estimated to introduce a direct cost of at least £265 million for Local
Government, before additional costs for commissioned services in the third and
independent sector are taken into account.  COSLA are asking the Scottish
Government to commit to passing on the promised consequentials.  
90

Page 91

4.8. Capital:  In terms of Capital allocations, it notes that the Local Government core
Capital Budget was cut by £56 million into 2024/2025, and that without adequate
capital funding, councils are unable to maintain and provide new vital infrastructure,
tackle the Housing Emergency, modernise key services in the face of increased
demand and the transition to net zero, or meet the rising costs of goods and
services. 
4.9. The capital ask noted by COSLA is £872 million which reflects the 2024/2025
Settlement plus the restoration of last year’s cuts, plus inflation dating back to 2020. 
It notes that capital funding is crucial to meeting the challenges posed by the
Housing Emergency, and that restoration of the £163 million cut to the Affordable
Housing Supply Programme must be prioritised. 
4.10. Council Tax: The document also states that there can be no repeat of last year’s
Council Tax freeze. Councils must be allowed to decide how to raise Council Tax on
a local basis with no Council Tax freeze or national cap. 
4.11. Conclusion:  The document closes by noting that ‘Local Government is close to
tipping point’ and if we want our councils to continue to provide the vital community
services and facilities that we all benefit from over the course of a normal day, there
can be more no flat cash settlements or budget cuts. Local Government must
receive a fair and flexible funding settlement. 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. As detailed in section 4 of the report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. This report is for information in the context of the national Local Government
Settlement.  The level of Scottish Government Grant allocated to the Council via the
Local Government Strategy is one of the key risks of the Budget Strategy. 
8.2. There are no implications for sustainability in terms of the information contained in this
report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report.  
91

Page 92

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637), E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
92

Page 93

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Chief Executive  
Subject: Marmot Place for South Lanarkshire 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform the Executive Committee of the Marmot approach to place and provide an
update on South Lanarkshire’s successful application to participate in a Scottish
pilot 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendations:-
[
(1) to note that South Lanarkshire Council, in partnership with NHS Lanarkshire
and the Community Planning Partnership, is one of three Scottish local
authorities that will particate in the Scottish Marmot Place pilot. 
3. Background
3.1. Marmot Places is an evidence-based, place approach where partners collaborate
to reduce inequalities in a defined ‘place’. The ‘place’ could be a town, a
neighbourhood or a whole authority. 
3.2. University College London’s Institute of Health Equity (IHE), led by Professor Sir
Michael Marmot, is a leading global health institute which has worked with more
than 45 local authorities, the NHS, businesses and the community and voluntary
sector to improve health and reduce inequalities. 
3.3. A Marmot Place recognises that health and health inequalities are mostly shaped
by the conditions in which people are born, grow, live, work and age. It takes
action to improve health and reduce health inequalities and can demonstrate
success in Marmot towns in reducing health inequalities. 
3.4. Based on eight principles, outlined in Appendix 1, Marmot Places develop and
deliver interventions and policies to improve health equity, embed health equity
approaches in local systems and take a long-term, whole-system approach to
improving health equity.  
3.5.  A whole systems approach to health recognises that our health is shaped by
many things: 40% social and economic factors, 30% health behaviours, 20%
health services, 10% physical environment.1 No one service or agency controls
all of these factors and indeed some of them are beyond control of public
services, but many are not. 
1 Adapted from the Kings Fund (A Vision For Population Health | The King's Fund (kingsfund.org.uk)
10
93

Page 94

3.6. Life expectancy is no longer rising in Scotland, and we have seen a widening of
health inequalities. Average living standards, measured by household incomes,
have never returned to pre-2010 levels of growth and have fallen since 2019.
People living in the most deprived areas experience poor health longer and die
younger than people living in the least deprived areas.2 
3.7.  Key population-level indicators of health and living standards are showing
concerning trends at a Scotland wide level:-
▪ More people in Scotland are in relative poverty now than they were pre-
pandemic.
▪ People in Scotland are now more likely to be inactive due to long-term
illnesses.
▪ Food insecurity, homelessness, and fuel poverty are all higher than they were
pre-pandemic.
▪ Gaps in education between students in deprived and non-deprived areas
remain high.
▪ Men are also of particular concern, with higher mortality rates from alcohol,
drug misuse, and suicide compared to the general population.
▪ Alcohol mortality also increased in 2023.3 
3.8. Acknowledging that reducing budgets creates significant and often implicit and
tacit barriers to achieving change for better outcomes, the Marmot Place
approach assists organisations to examine these social and economic
determinants in a local context, creating a place-focused evidence base from
which to make decisions to improve healthy life expectancy for those
experiencing inequality. 
3.9. In May 2024, local authorities were invited to apply to be one of three areas in
Scotland that would work with IHE and Public Health Scotland (PHS) on a
Scottish pilot project based on the Marmot approach. On 8 November 2024, the
Council was informed that our application had been successful. 
4 Marmot Place Scottish Programme
4.1.  The Marmot place programme will operate in Scotland as a partnership between
IHE, Public Health Scotland and the three Scottish local authorities to foster a whole
system collaboration (health and social care services, national and local government,
private sector, Third Sector, civic society, communities, academia) around a place
with health equity at its core. 
4.2. The process in the three local authorities will take just under two years and the
place- based work will have four main components: 
1. Analysis of data 
• Working with local data analysts and national and local data to provide data
packs identifying inequalities in health and the social determinants of health
with focus on particular groups and places. 
• Production of data and relevant advocacy for stakeholders within the place
including, across local government and the community planning partnerships,
healthcare, social care and public services, business and the economic
sector, the community and voluntary sector, communities.
• Prioritisation of specific issues, places and population groups 
2 State of the Nation (fraserofallander.org)  Published 11 Sept 2024 
3 State of the Nation (fraserofallander.org)  Published 11 Sept 2024
94

Page 95

2. Understanding enablers and barriers to action 
• Working with stakeholders across the ‘health equity' system within the place
to assess opportunities and barriers to action.
• Workshops with various stakeholders on specific areas, identified as priorities.
There will be a focus on commissioning and resource allocations within the
place.
• Working with the health equity system to identify ways forward for a long -
lasting health equity system. 
3. Development of recommendations for action 
• Based on stages one and two, IHE will work with key stakeholders to develop
recommendations to support better health and well being 
• Following development of recommendations, an implementation plan will be
proposed. 
4. Work with other places and the national system in Scotland 
• Based on the work within places, places will be asked to share their
experiences and learning with other places and with the national system in
Scotland
• IHE will support places to do this with briefings and relevant analyses. 
5. South Lanarkshire Application Summary
5.1. South Lanarkshire Council’s expression of interest to participate in the Scottish
Marmot Place pilot was submitted in partnership with NHS Lanarkshire, and the
Community Planning Partnership. 
5.2. It noted that our vision is that South Lanarkshire is a place that prides itself on using
evidence and research to create the best possible environment for the population to
live healthy, happy, thriving lives to help reduce the negative impacts of the social
determinants of health. 
5.3.  It stressed that we work to align our partnership’s resources to shared goals of
commissioning for health equity and joint resourcing for prevention by improving our
ability to understand and measure direct impact of our interventions and the links
across policy areas by linking all of them to broader goals of reducing poverty and
improving health inequality. 
5.4. Our application highlighted the fact that we are a unique authority in our geography
mix and size and while we have some highly-ranked Scottish Index of Multiple
Deprivation (SIMD) neighbourhoods, inequality in South Lanarkshire can be hard to
identify as it sits in ‘pockets’ of places, that are well planned and socially and
economically mixed in normal indicators of deprivation. Inequality in these pockets
can be masked within averages of high and low determinant indicators. 
5.5. The application further noted that we have solid foundations and a lot of place
focused opportunities in which to deliver change:-
 Council and Community Plans outline a similar place-based commitment
focusing on the social and economic determinants of health.
 Evidence-based Neighbourhood Plans.
 Rutherglen Shaping Places for Wellbeing Pilot .
 Development of Local Development Plan 4.
 Town Centre Master Planning in Rutherglen, East Kilbride and Hamilton.
 Considerable strategic policy intent to commission for equity across all
Resources. 
95

Page 96

5.6. The Marmot pilot should be regarded as a starting point, with all partners gaining the
knowledge and decision-making skills that will be required to mainstream this
approach long term. 
5.7. Marmot will help all partners learn to ensure that they are investing in the necessary
new skills and resources to fully assess the effectiveness and value for money of
public spending. It will improve governance and accountability through the robust
use of data to deliver policy. 
5.8. Each partner will be accountable for decisions relating to its own organisation’s
duties and resources as a contributor within a whole systems collaborative
programme. 
6. Next Steps
6.1. A meeting with Public Health Scotland and the Marmot Institute of Public Health
team will take place in early December to discuss the next steps and agree what
support would be available for each of the phases outlined in Section 4 over the next
two years. 
6.2 Community planning partners are currently developing joint priorities for discussion
with the Institute for Public Health team. We are considering how to establish a
collaborative evidence base of inequality for South Lanarkshire that is accessible
and referenced in both decision-making and evaluating impact. Within this, we are
considering how best to adopt place as a unifier of people’s life outcomes and how
planning for place could support more positive health outcomes. This is likely to also
be looked at through thematic lenses that are the 8 marmot principles for positive
health, outlined in Appendix 1, also known as the social determinants for health.   
6.3. Governance and briefing structures for Elected Members are under consideration
and a proposal will be provided at a future meeting of the Executive. 
7. Employee Implications
7.1. There are no employee implications at this stage, 
8. Financial Implications 
8.1. At this stage, there are no direct financial implications. 
9. Climate Change, Sustainability and Environmental Implications
9.1 It is expected there would be positive environmental impacts to a Marmot Place. It is
one of the eight principles to address in the programme. 
10. Integrated Impact Assessment and Consultation Requirements
10.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy at this time, and therefore no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
10.3. Introducing and developing the Marmot approach may in future require new
policies and approaches, or a review and change of existing policy, function or
strategy. At that point Integrated Impact Assessments may be required. 
96

Page 97

Paul Manning  
Chief Executive 
24 November 2024 
Links to Council Values/Priorities/Outcomes
• Links to all Council Values/Priorities/Outcomes 
List of Background Papers
Collaborating to reduce inequality Marmot Places (PDF) 
Contact for Further Information
If you would like further information, please contact:- 
Professor Soumen Sengupta, Director, Health and Social Care. 
South Lanarkshire University Health and Social Care Partnership
Email: soumen.sengupta@southlanarkshire.gov.uk 
Prof S. Josephine Pravinkumar, Director of Public Health & Health Policy , NHS
Lanarkshire 
Email: josephine.pravinkumar@lanarkshire.scot.nhs.uk 
Jen Kerr, Community Engagement Manager, South Lanarkshire Council
Email: Jennifer.Kerr1@southlanarkshire.gov.uk 
Aileen Murray, Community Planning Advisor, South Lanarkshire Council
Email: aileen.murray@southlanarkshire.gov.uk 
97

Page 98

98

Page 99

Collaborating to 
reduce inequalities
Marmot Places Scotland
Scotland’s challenge
•People in Scotland die younger than in any other country in western Europe. People in our
poorest areas die a decade before their neighbours in the wealthiest areas.1 
•Both life expectancy and health inequalities are getting worse. Scotland needs collective
action to change course. 1
•National action – like the smoking ban or minimum unit pricing for alcohol – needs to be
combined with local action to improve the nation's health.
Opportunity for collaboration 
•Public Health Scotland (PHS) and three local areas in Scotland have an opportunity to
collaborate with the University College London Institute of Health Equity (IHE), led by
Professor Sir Michael Marmot. A leading global health institute, the IHE has worked with
more than 45 local authorities, the NHS, businesses and the community and voluntary sector
to improve health and reduce inequalities. 
•This collaboration will address Scotland’s challenges and share insight and expertise to apply
learning from Marmot Places in Scotland. This work will be done collaboratively, supporting
work that is already underway at a local level. 
•We invite leaders at a local, regional and national level with a passion for improving health
and tackling health inequality to help shape the approach we take.
Delivering change
•Since 2013, Coventry has been a Marmot City. It has seen:
Improved life
expectancy by 
6 months.
Positive changes in
health outcomes.
Improvements in
school readiness 
at age 5.
Reduction in number
of areas rated in
England’s poorest
neighbourhoods.
Enhanced life
satisfaction.
Reductions in crime
in priority locations.Employment gains.
1 https://publichealthscotland.scot/our-areas-of-work/public-health-approach-to-prevention/scotlands-
public-health-challenges/
10
99

Page 100

For more information on Sir Michael Marmot, Marmot Cities and the IHE, visit
www.instituteofhealthequity.org 
Email: phs.chiefexecutive@phs.scot to get in touch.
1517 6/2024 ©
Public Health Scotland 2024
Becoming a Marmot Place
•A Marmot Place recognises that health and health inequalities are mostly shaped by the
conditions in which people are born, grow, live, work and age. It takes action to improve health
and reduce health inequalities.
'Marmot Eight' principles 
•Based on eight principles, Marmot Places develop and deliver interventions and policies to
improve health equity, embed health equity approaches in local systems and take a long-term,
whole-system approach to improving health equity.
Discrimination
•Tackle
discrimination,
racism and their
outcomes.
Work
•Create fair
employment and
good work for all.
Education
•Enable all children,
young people and
adults to maximise
their capabilities and
control their lives.
Early years
•Give every child the
best start in life.
Just transition
•Pursue
environmental
sustainability and
health equality
together.
Ill health prevention
•Strengthen the role
and impact of ill
health prevention.
Places
•Create and develop
healthy and
sustainable places
and communities.
Living standards
•Ensure a healthy
standard of living 
for all.
Sir Michael Marmot is a leader in improving population health. He has been Professor of
Epidemiology and Public Health at University College London (UCL) since 1985. He currently serves
as the Director of the UCL Institute of Health Equity.
For nearly 50 years, Sir Michael has led research groups dedicated to understanding and addressing
health inequalities. His influential work includes the groundbreaking ̒ Fair Society, Healthy Lives ̓ 
(known as 'The Marmot Review'), published in 2010.
Sir Michael played a pivotal role as the chair of the Commission on Social Determinants of Health
(CSDH), established by the World Health Organization (WHO) in 2005. In 2008, he authored the
report ̒ Closing the Gap in a Generation ̓ for the CSDH.1
About Sir Michael Marmot
PHS is an NHS board with a mission to improve health and tackle health inequality, working both
nationally and in support of local partners.
About PHS
1 www.who.int/publications/i/item/WHO-IER-CSDH-08.1100

Page 101

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Director, of Health and Social Care  
Subject: National Care Service – Update 
1. Purpose of Report
1.1. The purpose of the report is:-
[purpose]
 to provide members with an update on the National Care Service (Scotland) Bill
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the content of the report be noted.
[1recs]
3. Background
3.1. The National Care Service (Scotland) (NCS) Bill was published in June 2022
providing for the establishment of a NCS under the responsibility of Scottish
Ministers. 
3.2. In common with the approval process of other legislation, the NCS Bill has been
proceeding through three stages:- 
 Stage 1 – consideration of the general principles of the Bill by Parliamentary
Committee(s) and a debate and decision on these by the Parliament.
 Stage 2 – detailed consideration of the Bill by Parliamentary Committee(s).
 Stage 3 – final consideration of the Bill by the Parliament and a decision
whether it should be passed or rejected. 
After a Bill has been passed and has received royal assent, it then becomes an Act
of Parliament with implementation to follow. 
3.3. Progress with the development of an NCS and the associated Bill has been the
subject of previous updates to elected members.  The NCS Bill formally passed
Stage 1 and has been progressing through Stage 2 of the scrutiny process. 
3.4. In early July 2024, the Scottish Parliament’s Health, Social Care and Sport
Committee issued a Call for Views with regards to the draft amendments which the
Scottish Government was proposing at Stage 2 of the Bill. A South Lanarkshire
Council response was agreed at the August 2024 meeting of the Council’s Executive
Committee and subsequently submitted. That response can be viewed alongside all
those other submissions made, including that of COSLA, here: 
https://yourviews.parliament.scot/health/national-care-service-stage-2-call-for-
views/consultation/published_select_respondent 
11
101

Page 102

4. Updated Position
4.1. On 14 November 2024, the Minister for Social Care, Mental Wellbeing and Sport
confirmed that the Scottish Government did now not intend to start Stage 2
consideration of the NCS Bill on 26 November 2024; and that new Stage 2 dates will
be agreed between the Minister for Parliamentary Business and the Scottish
Parliament in due course. 
https://www.gov.scot/publications/national-care-service-update-letter-to-
stakeholders/ 
4.2. The COSLA response to the above announcement can be viewed here: 
https://www.cosla.gov.uk/news/2024/cosla-responds-to-national-care-service-
announcement 
4.3. On 21 November 2024, the Minister delivered a further statement to the Scottish
Parliament updating the Scottish Government’s position: 
https://www.gov.scot/publications/social-care-minister-statement-on-national-care-
service/  
5. Employee Implications
5.1. While there are no direct implications of the report itself, members may want to note
the workforce implications outlined within Audit Scotland’s recent publication
Integration Joint Boards: Finance and Performance 2024.   
6. Financial Implications
6.1. While there are no direct implications of the report itself, members may want to note
the financial implications outlined within Audit Scotland’s recent publication
Integration Joint Boards: Finance and Performance 2024.   
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in 
terms of the information contained in this report. 
8. Other Implications
8.1. The Council’s top risks are currently being reviewed and evaluated.  Part of these
considerations will be a review of the current risk status of the NCS for the Council. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce any new policy, function or strategy or recommend a
change to existing policy, function or strategy, and therefore, no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Professor Soumen Sengupta
Director, Health and Social Care 
25 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Accountable, efficient, effective and transparent  
102

Page 103

Previous References
• Executive Committee – 7 August 2024
List of Background Papers
• Audit Scotland - Integration Joint Boards: Finance and Performance 2024
https://audit.scot/publications/integration-joint-boards-finance-and-performance-2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Professor Soumen Sengupta
Director, Health and Social Care
E-mail: soumen.sengupta@southlanarkshire.gov.uk 
103

Page 104

104

Page 105

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Commercial Opportunities 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the work being undertaken to explore commercial
opportunities for the Council 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the work being undertaken to explore commercial opportunities be noted. 
3.  Background
3.1. The medium-term position regarding the Council’s budget means that the Council
needs to consider commercial opportunities to generate income.  This report sets out
the various opportunities which have/are being explored through Enterprise and
Sustainable Development Services.   
3.2. It is worth highlighting that due to legislative changes, the Council is prohibited from
investing in commercial opportunities purely for financial gain.  Instead, any investment
must be linked to economic/regeneration outcomes. 
4. Town Centre Regeneration
4.1. Civic Centre, East Kilbride 
4.1.1. Working with colleagues in Property, Finance and Legal Services, Enterprise and
Sustainable Development had prepared proposals for a 130,000sqft Grade A office
development for an occupier on the Civic Centre site in East Kilbride.  Heads of Terms
had also been agreed with an investor who would deliver the project once ‘preferred
developer status’ had been confirmed.  The Heads of Terms would have secured a
capital receipt for the site, taking account of the demolition costs of the building.    
12
105

Page 106

4.1.2. As reported to this Committee in January 2024, the occupier is no longer seeking a
new build development but instead has identified existing premises within East Kilbride
to which to relocate.  Whilst this opportunity would have realised a modest capital
receipt for the Council, it would have also removed a liability and acted as the catalyst
for the redevelopment of the wider town centre.   
4.1.3. Taking advantage of the work undertaken on this project, the site is currently being
marketed on behalf of the Council by Avison Young and nine expressions of interest
have been received so far.  A closing date for offers has been set for 30 January 2025.   
4.2. East Kilbride Shopping Centre 
4.2.1. On 13 September 2023, Committee approved the East Kilbride Town Centre
Masterplan as the basis for the future strategic approach to investment. Heads of
Terms for the transfer of the Centre West site have been agreed with the
Administrators, Interpath, which were also approved at the Executive Committee on
13 November 2024.  Subject to final contract with Interpath, the site will transfer to the
Council on 30 December 2025, paving the way for demolition and redevelopment of
the site.  External advisors have been procured to support the delivery of this complex
project. 
4.2.2. Enterprise and Sustainable Development together with colleagues in Property,
Housing and Finance are undertaking an options appraisal for the redevelopment of
the existing Centre West site as a new residential neighbourhood. The potential for
complementary commercial uses which could bring a revenue income to the Council
will also be part of this options appraisal. The deliverability of commercial space will
be dependent on market conditions when the development is being undertaken, in
2027/28. This appraisal considers disposal of plots, joint venture arrangements and
investor opportunities.  A further report will be brought to Committee on the preferred
delivery model in due course.   
4.2.3. The Outline Business Case for the project is subject to a separate report for
consideration by Committee prior to submission to Glasgow City Regional for
approval.   
4.3. Hamilton Town Centre
4.3.1. In February 2024, Committee approved the Hamilton Town Centre Masterplan which
includes proposals for the New Cross Centre, which the Council owns, and the Regent
Centre, for which the Council holds the ground lease.   
4.3.2. Colleagues in Property are working toward securing vacant possession of the
remaining leases within the New Cross Centre prior to the Centres closure.   Enterprise
and Sustainable Development are preparing proposals and a delivery model for the
redevelopment of the site for residential development.   
4.3.3. The current owners of the Regent Centre have appointed agents Lambert Smith
Hampton to market the site as a ‘substantial mixed use development opportunity’.  The
106

Page 107

site is being actively marketed which could provide an opportunity for the Council’s
adjoining sites to form part of a wider redevelopment opportunity.   
4.3.4. The masterplan presents opportunities to consolidate the Council’s occupation of
property in the town centre and realise savings in the medium term through the
surrender of existing lease obligations. 
5. Inward Investment 
5.1. In February 2024, Community and Enterprise Resources Committee approved the
Inward Investment Strategy for South Lanarkshire.  Since then, a new dedicated
website ‘Invest South Lanarkshire’ has been launched which provides a platform for
marketing sites and attracting investment. 
Invest South Lanarkshire | Property, Land, TV and Film Investment 
5.2. A ‘One Stop Shop’ approach has been established for engaging with developers,
agents and investors with enquiries being monitored and tracked.  There are currently
live discussions underway with interested parties for Langlands West, East Kilbride
Civic Centre, Shawfield, Clydebridge and Caldwellside.   
5.3. Community and Enterprise Resources have also commissioned a Land and Property
Market Analysis which was reported to Community and Enterprise Resources
Committee on 26 November 2024.  This analysis identifies opportunities for industrial
commercial development across South Lanarkshire with specific opportunities for the
Council.  These will now be developed in greater detail.   
5.4. This work has also been the catalyst for a similar survey undertaken by Glasgow City
Region which looked at commercial development opportunities across the region in
which South Lanarkshire feature prominently. This has also led to a potential regional
project being prepared into which all member authorities have been asked to submit
expressions of interest. The Council has submitted bids of £17.25m for five projects
which could unlock a combined investment value in excess of £75.25m. 
5.5. The combination of the above initiatives will allow Enterprise and Sustainable
Development to prepare a suite of shovel ready projects which will allow the Council
to react effectively to market interest and future funding opportunities through either
internal funds or more likely Scottish or UK Government funding. The delivery of
projects could be under a variety of models depending on the individual circumstances
including, Council development, partnership working / joint ventures, gap funding /
grant support. All proposals will be subject to appropriate committee approval /
delegated authority. 
6. Film and TV Opportunities 
6.1. Film and TV opportunities for Lanarkshire have to date been co-ordinated by North
Lanarkshire Council which has resulted in this Council being in a more reactive
position.   
6.2. In recent months, the Council has ‘hosted’ the filming of Lockerbie which was co-
ordinated by the Communications and Strategy Team.   In order to take a more
proactive approach to these opportunities and also to promote South Lanarkshire,
Enterprise and Sustainable Development will now lead on this activity.  A separate
report is being prepared for Community and Enterprise Resources Committee in this
regard.  In recent weeks, Enterprise and Sustainable Development have secured
107

Page 108

filming of a television commercial, a horror film and BBC Children in Need/One Show
which generated income for the Council and South Lanarkshire Leisure and Culture.   
7. Renewable Energy 
7.1. Working with colleagues in Housing and Technical Resources, discussions are taking
place with Scottish Water regarding the establishment of a heat network for the
Bothwell Road/Almada Street area which could produce revenue saving opportunities
and limit capital investment for the Council. 
7.2. Officers have also been exploring opportunities for battery storage and solar array on
Council owned land.  Discussions have taken place with Scottish Power Energy
Networks and North Ayrshire Council who have established a solar photovoltaic farm
which is estimated to generate £12.8m over a 20-year period.  Learning points are
currently being considered.   
7.3. Officers are continuing to explore commercial delivery models for electric vehicle
charging to be rolled out across Glasgow City Region.   
8. Next Steps and Timescales
8.1. There are a number of opportunities being explored or being realised which have
varying timelines.  Separate reports will be brought to Committee as opportunities
crystalise, and approvals sought.   
9. Employee Implications
9.1. Opportunities are being led by officers within Enterprise and Sustainable Development
Service. 
10. Financial Implications
10.1. There are no financial implications of this report.  The opportunities being explored
aim to ultimately generate income for the Council and in the short to medium term
contribute to future year’s budget strategies.   
11. Climate Change, Sustainability and Environmental Implications
11.1. All projects will be taken forward in line with the Council’s sustainability objectives. 
12. Other Implications
12.1. A number of the opportunities being explored have current and future liabilities for the
Council which require to be mitigated.  Disposal and redevelopment must be actively
considered which may incur some upfront expenditure which will be subject to future
approvals.   
13. Integrated Impact Assessment and Consultation Requirements
13.1. Integrated Impact Assessments will be undertaken as projects are developed. 
13.2. Consultations have taken place with a number of Resources and will continue to do
so as projects are developed.  The town centre masterplan activity has also been
subject to extensive community consultation.   
David Booth 
Executive Director (Community & Enterprise Resources) 
14 November 2024 
108

Page 109

Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in a sustainable environment
 Thriving business, fair jobs and vibrant town centres 
Previous References
 Commercial Opportunities Report, Executive Committee, 24 January 2024. 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Alison Brown, Head of Enterprise and Sustainable Development  
alison.brown@southlanarkshire.gov.uk 
109

Page 110

110

Page 111

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Cost of Living Support 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Executive Committee with an overview of the support provided to
households in South Lanarkshire in response to the cost-of-living crisis
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]h
(1) that the range of support being provided to households in response to the
ongoing impact of the cost-of-living crisis be noted. 
[1recs] 
3. Background
3.1. Since the start of the cost-of-living crisis, reports have been provided to the
Executive Committee outlining the range of the measures in place across Council
services to support households in managing the effects. This report provides an
update on the activity taking place in 2024/2025. 
3.2. Inflationary pressures have eased, with the Consumer Price Index (CPI) at 2.3% in
October down significantly from a recent high of 11.1% in October 2022. However,
rising energy costs have fed into the October inflation with it increasing from 1.7% in
September. The Bank of England base rate is currently 4.75%, following small
reductions of 0.25% in July and November 2024. 
3.3. Despite these overall improvements in economic indicators, prices remain high with
pressure on household incomes remaining significant.   
4. Cost of Living Support 
4.1. Money Matters Advice Service
4.1.1. In 2024/2025, the Money Matters Advice Service (MMAS) is continuing to support
the residents of South Lanarkshire to maximise their income, provide emergency
support and address issues of over-indebtedness. 
13
111

Page 112

4.1.2.  In the first 6 months of 2024/2025, the service has dealt with 7,202 unique clients in
relation to 20,215 issues. The final financial gains for the six months from April –
September 2024/2025 are provided below:- 
Type of Gain 2024/2025 
(Apr-Sept)
Total welfare/benefit financial gain £11.4m
Total debt write-off £1.1m
Total Financial Gain  £12.5m 
4.1.3.  The levels of client demand for support can fluctuate with the seasons, and the
winter/spring months can see increases in the number of clients seeking support. 
4.1.4.  In 2023/2024 MMAS also developed its Community Wellbeing Team into a triage
and emergency support team to support the service and residents. This has allowed
a more streamlined process to be developed to ensure more clients are receiving
immediate when a need is identified via a triage system. 
4.1.5.  In 2024/25, the Community Wellbeing Team made the following referrals for energy
top up vouchers and foodbank vouchers:- 
Type of Referral 2024/2025 (Apr-
Sept)
Energy Top Up Voucher Referrals 2,145
Foodbank Referrals 1,099 
4.1.6. Importantly, 99% of all clients who receive foodbank and fuel bank referrals receive
the referral on the same day they contact the service. 
4.1.7. This year, the energy top up vouchers that MMAS has been supplying have been
through its partnership with the Fuel Bank Foundation, a UK Fuel Crisis charity. The
financial value of these energy top up vouchers for South Lanarkshire residents in
the first 6 months of 2024/2025 has been £0.062m. The financial value of vouchers
normally increases during winter months. 
4.1.8. Other support that the Community Wellbeing Team has been making available to
support South Lanarkshire residents, who are in food and fuel crisis, has been
through the Cash First Scheme in partnership with the Citizens Advice Bureaux.
Providing £50 vouchers, this Scheme has been funded through the Council’s Warm
Welcome Fund and was launched in October 2023. It is expected to continue until
August/September 2025. 
Vouchers Issued April 24 – Sept 24
Vouchers
Value
Cash First  2,359 £117,950 
4.1.9. 97% of all eligible applicants receive their cash voucher on the same day they apply. 
4.1.10.The scheme has been extended to assist residents who are going through managed
migration onto Universal Credit. This is to support these residents as the process
can leave people with a gap of up to 5 weeks between the last payment of their
legacy benefits and their first payment of Universal Credit. Awards under this project
do not impact on a resident’s entitlement under the main Cash First Scheme.  
112

Page 113

4.1.11.MMAS has also launched a Winter Fuel Payment/Pension Credit take-up campaign
in response to the UK and Scottish Government’s decisions to make Winter Fuel
Payment/Pension Age Winter Heating Payment a means tested benefit. As part of
the take up campaign the Council has written to those who may be eligible for the
winter payment who are in receipt of council tax reduction but not in receipt of
Pension Credit to encourage take-up. Similar activity is expected from the
Department of Work and Pensions. 
4.1.12.The take-up campaign has been launched in collaboration with all four of South
Lanarkshire’s Citizen Advice Bureaux and has seen over 400 posters and over 8,000
leaflets distributed across South Lanarkshire, through libraries, GP surgeries,
housing offices and at multiple community events and hubs. 
4.1.13.MMAS has also been working with SGN, a British gas distribution company and
have been awarded £0.056m for 12 months, to employ an additional temporary
Energy Adviser. The Advisor will provide a wide range of support including provision
of energy advice, distribution of 150 carbon monoxide alarms, provision of top up
vouchers and the distribution of 5,000 fuel poverty leaflets. 
4.2. Benefits and Revenues
4.2.1. Support for households who have fallen into arrears or are experiencing difficulty
with payment of council tax, continues to centre on the award of Council Tax
Reduction (CTR).  There are currently 30,604 active claims for CTR in South
Lanarkshire. The projected value of awards for 2024/2025 at £23.673m is 1% higher
than the actual for 2023/2024. 
4.2.2. There continues to be significant demand for grants from the Scottish Welfare Fund
(SWF) with applications 1% higher than last year at this time, and 16% higher than
the corresponding pre-covid level. Grants to a value of £1.136m have been awarded
this year to 30 September 2024. 
4.2.3. The Council is projected to spend £55.1m of Housing Benefit in 2024/2025
supporting low-income households to pay their rent with a further £4.481m of
Discretionary Housing Payment (DHP) spend already committed in 2024/2025 for
this purpose.   
4.2.4. To 30 September 2024 the service made payments to low-income households of
£2.745m covering School Clothing Grants (£1.827m) and Free School Meal (FSM)
payments for holidays (£0.918m). 
4.3. Support for tenants
4.3.1. Housing Services continues to support Council tenants with rent arrears by providing
financial assistance through its successful Tenancy Sustainment Fund, sustaining
tenancies and preventing homelessness.  This has helped 122 individual households
and 58 children so far this year, with awards totalling £0.080m. 
4.3.2.  The Resource continues to promote the supports available to tenants through the
Council’s social media platforms and in the Housing news publication, which is
issued to Council tenants. The current economic climate continues to financially
impact many tenants, directly affecting their ability to pay rent.  
113

Page 114

4.3.3. The Rent Income Support team continue to work with an increased number of
Council tenants to support them through the transition to Universal Credit and to
maintain their rent payments and work closely with the DWP and other partners to
ensure that tenants receive the appropriate advice and support.     
4.3.4. As the number of homeless applications rises both nationally and locally, the
Council’s homelessness service continues to face significant pressure to provide
permanent accommodation and support to households experiencing homelessness.
Households experiencing homelessness remain vulnerable to financial insecurity
and hardship, particularly in the current economic climate. To address these
challenges and other issues associated with homelessness, housing support is
offered to those with an assessed need. The support and advice are tailored to meet
individual needs, helping households move into permanent and settled
accommodation and supporting tenancy sustainment. 
4.4. School Meal Debt
4.4.1. The joint working group in Community and Enterprise Resources and Education
Resources continues to review the levels of school meal debt and is in the process
of issuing new internal procedures on the management of school meal debt and the
process for consideration for write-off or recovery.  This is linked to recent COSLA
guidance and has been prepared in conjunction with the Money Matters Advice
Service and the Benefits and Revenues Service. 
4.4.2. The Council continues to provide a school meal for all children who require one,
even if they are unable to pay on the day. 
4.4.3. A bid has been made to the Scottish Government allocation of £1.5m to support
councils in the writing off of school meal debt with a response from government
awaited.   
4.5. Foodbanks
4.5.1.  Figures provided by South Lanarkshire’s 8 local foodbanks for the first 6 months of
2024/2025 show that 12,732 households were referred by a variety of local support
agencies for emergency food aid to food banks in South Lanarkshire. This is
representing a 1% reduction in comparison with the same period last year. 
4.5.2.  21,552 people were fed in this period through emergency food aid by foodbanks
which represents a 2% increase in comparison with the same period last year.   
4.5.3.  While these figures identify a slowing rate of referral, they also show a continued
increase in number of persons fed by emergency food aid. The 2% increase is on
top of recurring increase in use of emergency food aid year on year since the
pandemic. 
4.5.4.  However, this year, they also indicate a continued increase in struggling families
accessing foodbanks. Compared to the first 6 months of 2023/2024, there has been
a 23% rise in the number the number of children in receipt of emergency food aid
albeit with a 9% decrease in the number of adults in receipt of food aid. 
4.5.5.  South Lanarkshire’s Foodbanks continue to grow their cash first approach with 255
fresh fruit and vegetable vouchers during the first six months of the year. This is an
increase of 63% in comparison with the same period last year. Fuel Vouchers also
increased this period by 9% with 635 provided. These increases are on top of record
high figures last year. 
114

Page 115

4.5.6. The Community Wish List matches local businesses with local community groups to
facilitate offers of goods and services. Items donated to foodbanks this year under
this arrangement include pallets of crisps, food and financial donations. 
4.5.7. Foodbanks have also had access to period products, and Money is Not the Only
Problem leaflets and resources.    
4.5.8. South Lanarkshire Council’s Secret Santa's Winter Wishes initiative also provides
gifts and food donation for the holiday period to foodbanks.  Donations are from
Council employees directly, or from partners of the Community Planning Partnership. 
4.6.     Care Experienced Young People 
4.6.1.  Activity is underway to support the ‘Winter Wishes’ programme for care experienced
young people. This was also delivered in 2022 and 2023 as part of the Winter
Wishes campaign to support care experienced children in the community with
clothing, Christmas dinner and a Christmas gift over the festive period. It is intended
to replicate the payments this year for our most vulnerable children in the community
who will be exposed to hardship or isolation during this period and the monies will be
administered in a combination of ways. 
4.6.2. Care experienced children in the community involved with the Throughcare Aftercare
Team or Whole Systems Team will receive a payment of up to £200 for food
vouchers and winter fuel payments. Care experienced children whose carers do not
receive additional support over the Christmas period will also be assessed for
additional support also for food vouchers and winter fuel payments up to £200. An
award of £1,000 will be made to the Family Connections Team to support looked
after children in Foster Care to support Christmas parties and events for those
children. Also, an award of £700 will be made to the six Children’s Houses to support
the houses to lay on events and activities for the children in the houses over the
festive period. For many children in the community this is an invaluable lifeline and
contact for care experienced children who are at their most vulnerable at this time of
year. £500 will be used to purchase warm clothing for the clothing bank within the
Hub and £1000 to stock the food larder over Christmas. The food larder is stocked
within the Throughcare Aftercare Hub and used as a lifeline for young people for
emergency sustenance as a result of crisis. 
4.6.3. The aim is to ensure that no South Lanarkshire care experienced young person who
does not have a family network for support over this period is left without over this
period. The support will be co-ordinated by the Throughcare After Team supported
by the Council’s Promise workers. The outcomes will also be fed back through the
Council’s Corporate Parenting Group and to the Promise Board. It is estimated the
cost of providing the support is £0.042m. 
4.7. Cost of the School Day
4.7.1. Education Resources has developed Cost of the School Day (COSD) Guidance for
schools and Early Years establishments containing 10 areas to reduce the cost of
the school day in all our schools and Early Years Establishments alongside advice
on communicating with families. Examples include promoting the use of affordable,
inclusive and flexible uniforms for children and young people and committing to no
child or young person incurring additional cost for any aspect of their core
curriculum/education.  
115

Page 116

5. Outlook
5.1. While inflation is reducing the significant pressure on household finances is expected
to continue throughout 2024/2025 because of the higher prices still being
experienced for many households. The demand for welfare advice and support
services is, therefore, expected to continue to be significant. 
5.2. The Council will continue to provide support from the range of services and budgets
available. 
6. Employee Implications
6.1. The support outlined in the report is provided by a range of teams across Finance
and Corporate Resources, Housing and Technical Resources, Social Work
Resources and Education Resources. 
7. Financial Implications
7.1. The financial implications of providing the support outlined in the report are met from
existing budgets.   
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
9. Other Implications
9.1. While the Council is providing a broad range of support throughout 2024/2025 with a
significant level of financial resources, the actions outlined in the report are not
expected to be sufficient to fully mitigate the worst effects of the cost-of-living crisis
experienced by many households in South Lanarkshire. This reflects the scale and
depth of the crisis and the need for significant input from other sectors such as
governments and the energy sector. 
9.2. The ability of local government to provide further mitigation remains heavily reliant on
the responses from both UK and Scottish governments and the severity of the
economic conditions that are experienced.   
10. Integrated Impact Assessment and Consultation Arrangements
10.1. There is no requirement to equality impact assess the content of this briefing paper
or perform consultation. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
14 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent  
116

Page 117

Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
117

Page 118

118

Page 119

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Artificial Intelligence and the Council 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Executive Committee on the strategic implications and emerging
applications of Artificial Intelligence (AI), particularly generative AI, within local
government. It discusses the potential for operational efficiencies and outlines the
necessary governance frameworks for information security and technical
management
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of this report is noted;
(2) that the activities being undertaken by other authorities, which are
summarised in section 5 and further detailed in appendix 1, are noted; and
(3) that the actions and next steps, proposed detailed in section 7 within the
report, are noted. 
3. Background
3.1. As the public sector navigates an era of rapid technological advancement, the
accelerating pace of change AI presents both challenges and opportunities. The
constant evolution of AI technologies requires councils to stay informed and agile,
ensuring that they can leverage these tools effectively to enhance public services. 
3.2. Evaluating the benefits and potential use cases of AI involves a strategic approach,
assessing not only the immediate gains in efficiency and service quality but also
considering long-term impacts on staff, citizens, and resource allocation. 
3.3. Below is an overview of key AI technologies, from foundational machine learning to
the latest developments in generative AI, that could play a pivotal role in helping the
Council address current and future challenges. 
 Basic Machine Learning (ML): Machine learning involves algorithms that allow
systems to learn from data and improve over time without being explicitly
programmed. In the context of a local authority, ML can be used for predictive
analytics, such as forecasting demand for public services, optimising resource
allocation, or identifying patterns in service usage. For instance, ML models could
predict which areas might require more frequent waste collection based on
historical data or forecast population growth to aid in long-term planning.
14
119

Page 120

 Robotic Process Automation (RPA): RPA involves automating routine, rule-based
tasks typically performed by humans. For a local authority, this could mean
automating administrative tasks such as processing applications, managing
payroll, or handling routine customer service inquiries. RPA can help free up staff
time, reduce errors, and improve the efficiency of operations by handling
repetitive tasks more quickly and consistently than humans. 
 Natural Language Processing (NLP): NLP is a branch of AI that enables
machines to understand, interpret, and generate human language. In a local
authority setting, NLP could be used to analyse public feedback, automate the
processing of citizen requests through chatbots, or improve accessibility by
offering services in multiple languages. It can also be used to monitor social
media channels or survey responses to gauge public sentiment about local
issues. 
 Computer Vision (CV): This technology allows computers to interpret and make
decisions based on visual data, such as images or videos. For a local authority,
computer vision can be used in areas like traffic management, where cameras
analyse vehicle flows to optimize traffic light timing or detect violations. It can also
be used in public safety, such as monitoring CCTV footage to identify suspicious
activities or ensuring compliance with regulations through automated inspection
of infrastructure. 
 Generative AI (GenAI): Generative AI refers to systems that can create content,
such as text, images, or even software code, based on patterns learned from
training data. Local authorities could leverage GenAI to draft reports, generate
creative content for public campaigns, or automate the creation of
documentation. This technology can also assist in developing personalised
communication with citizens, improving engagement and service delivery. 
 Large Language Models (LLMs): LLMs, like those underlying ChatGPT, are
advanced AI models that can understand and generate human-like text. They can
be employed by local authorities for a range of tasks, from answering complex
queries to assisting in the drafting of policy documents. LLMs can also help in
analysing large volumes of text data, such as public consultation feedback, to
identify key themes and insights, facilitating data-driven decision-making. 
3.4. The rapid deployment of AI technologies brings significant ethical considerations,
particularly around issues of bias and fairness. AI systems, including those used in
local government, are often trained on large datasets that may inadvertently reflect
societal biases. This can lead to skewed outcomes, such as unfairly disadvantaging
certain groups in decision-making processes related to public services, housing
allocations, or law enforcement. 
For the Council, the risk is that without careful oversight, AI could reinforce existing
inequalities rather than alleviate them. Therefore, it is crucial to implement robust
governance frameworks that ensure transparency, accountability, and fairness in AI-
driven decisions.  
120

Page 121

Moreover, the ethical implications of AI extend beyond bias to include concerns
around privacy, autonomy, and the potential for job displacement. The use of AI to
process personal data, automate decision-making, or even replace human roles in
the workforce raises questions about the balance between efficiency and the rights
of individuals. 
3.5. Local authorities must consider the broader societal impacts of AI, ensuring that its
implementation respects citizens' privacy and dignity while also providing safeguards
against misuse. Engaging with communities, experts, and stakeholders in an
ongoing dialogue about the ethical use of AI will be key to building trust and ensuring
that these technologies are used responsibly and equitably. 
3.6. Nationally, the Scottish Local Government Digital Office is driving the AI agenda to
ensure that the technology is adopted collaboratively, safely and ethically. The
Council’s approach will leverage this ambition to reduce risk of moving forward on
our own and accelerate our understanding and adoption. 
3.7. Artificial intelligence (AI) is a key thread within the Digital Transformation agenda for
the Public Sector, and specifically for South Lanarkshire Council. 
4.  Current Use 
4.1. The Council has AI in various forms already deployed within the technical
environment and utilised by Resources. These include, but are not limited to:  
 Vaisala RoadAI (Uses CV & ML)
Vaisala provide AI-powered solutions like RoadAI which leverages computer
vision and machine learning to analyse video data from infrastructure, enabling
automated detection of issues such as potholes, lane markings, and traffic sign
maintenance. 
 Oracle Invoice Scanning (Uses CV, NLP &ML)
Oracle Invoice Scanning is an AI-power solution intended to streamline and
automate invoice scanning and routing. Oracle’s approach aims to reduce
manual data entry, minimize errors, and accelerate the invoice processing time,
providing more efficient financial operations. 
 NDL Web form integration (Uses RPA, NLP & ML)
NDL Automate facilitates the integration of web forms with back-end systems by
automating the data extraction, transformation, and insertion processes. It uses a
combination of RPA for task automation, NLP for understanding unstructured
data, and ML for predictive analysis and continuous improvement. This
integration ensures that organizations can handle data efficiently, reduce manual
effort, and enhance their overall operational efficiency. 
5.  Opportunities 
5.1. There are a range of opportunities for the Council when it comes to AI. The
challenging part is identifying the right opportunities and approaching it in a way that
is safe and secure but also delivers value. 
121

Page 122

5.2. Several UK Local Authorities have already implemented a range of use cases using
AI. Appendix 1 contains a summary of those use cases. These are currently being
reviewed by the relevant Resources to assess feasibility and opportunity to replicate
and consider developing a business case. 
The Council can learn from these examples and explore AI-driven solutions tailored
to our specific needs. For instance, we could consider: 
 Implementing AI tools like those used by Brent and Bristol to automate content
creation, ensuring consistent and timely communication with residents.
 Further adoption RPA, as done by North Lanarkshire and Sunderland, to
streamline repetitive tasks like payment processing and inspection scheduling,
freeing up staff for more complex work.
 Utilising AI for operational efficiency, inspired by Glasgow and Sheffield, such as
optimizing waste collection routes or predicting infrastructure maintenance needs.
 Enhancing customer contact through AI-driven chatbots and virtual assistants,
like those used by Enfield and Leeds, to improve service delivery and resident
engagement.
 Leveraging data analysis tools, as in Leeds and Hackney, to gain insights into
service demands, crime trends, and transportation patterns, enabling more
informed decision-making. 
6.  Challenges to adopting AI
6.1. The Council faces several challenges in adopting AI, from data quality issues to
ethical concerns, all of which require careful consideration and proactive
management. Understanding these barriers is key and highlight the challenges that
need to be addressed to successfully implement AI technologies. 
6.2. Data - One of the most significant barriers to implementing AI in the public sector is
the quality, availability, and management of data. AI systems require large volumes
of high-quality, structured data to deliver accurate insights, but many councils
struggle with data that is incomplete, outdated, or siloed across different
departments. This fragmentation hinders AI's effectiveness and can lead to
unreliable outcomes. Additionally, issues related to data governance and privacy are
particularly challenging in the public sector, where sensitive information must be
handled with great care. Without addressing these data-related challenges, the full
potential of AI cannot be realised. 
6.3.  Funding - Securing adequate funding is another major challenge for AI projects,
particularly in the public sector where budgets are constrained. AI initiatives typically
require significant upfront investment in technology, infrastructure, and talent, which
can be difficult to justify if the benefits are long-term or not directly linked to savings.
The approach proposed at this stage is to develop business cases for each
opportunity as they are identified. 
6.4.  Skills - A critical barrier to AI adoption in the public sector is the shortage of skilled
professionals with expertise in data science, machine learning, and AI systems.
Public sector organizations struggle to attract and retain this talent due to
competition from the private sector, where salaries and opportunities are often more
attractive. Additionally, existing staff may lack the necessary training to work
effectively with AI tools, creating a skills gap that hinders successful AI deployment.
Without addressing this shortage, the public sector risks falling behind in the
adoption of AI technologies.  
122

Page 123

6.5. Ethics and Bias - Ethical concerns and the risk of bias are significant barriers to AI
adoption, particularly in the public sector where decisions can have wide-reaching
impacts on society. AI systems are only as good as the data they are trained on, and
if this data is biased, the outcomes can be unfair or discriminatory. For example, AI
used in decision-making processes for public services could inadvertently reinforce
existing inequalities if the underlying data is biased. Additionally, there are broader
ethical concerns about the transparency and accountability of AI systems,
particularly when they are used in sensitive areas like law enforcement or social
services. Public trust in AI can be eroded if these ethical issues are not addressed. 
6.6. Change Fatigue - Change fatigue is a psychological barrier that occurs when
organisations undergo continuous or rapid changes, leading to resistance or burnout
among staff. SLC employees may already be experiencing change fatigue due
reductions in staffing, new systems and process and changing policy landscape.
Introducing AI can be perceived as yet another disruptive change, leading to
resistance or disengagement from staff. 
6.7. Capacity for Change - Closely related to change fatigue is the overall capacity for
change within the organisation including the IT Service. Implementing AI requires not
only technological changes but also shifts in processes, culture, and mindset. Public
sector organisations can struggle with the agility needed to adopt AI. The capacity
for change is often limited by existing workloads, rigid structures, and a lack of
resources for training and development. Without building a strong foundation for
change, including leadership support, clear communication, and adequate
resources, AI initiatives are likely to face significant hurdles. 
6.8. Resistance to Change – Resistance to AI adoption often stems from fears of job
displacement, scepticism about the reliability and fairness of AI systems, and
discomfort with changing established workflows. Employees may resist AI due to
concerns that it will replace their roles or because they lack understanding of how AI
can complement their work. Additionally, the complexity and perceived opacity of AI
technologies can lead to mistrust, particularly when the decision-making processes
are not transparent. Addressing these concerns through education, transparent
communication, and involving employees in the AI adoption process is crucial for
overcoming resistance and ensuring successful integration of AI technologies in the
workplace. 
6.9. Digital Exclusion - Digital exclusion poses a significant challenge to the effective
adoption of AI in the public sector, impacting both staff and residents. 
For staff, digital exclusion can result from a lack of access to necessary technology,
inadequate digital literacy, or insufficient training to effectively engage with AI tools.
This gap can hinder the implementation of AI initiatives and reduce the overall
effectiveness of public services. 
On the residents' side, digital exclusion is a major concern, particularly for vulnerable
groups such as the elderly, low-income individuals, or those in rural areas who may
lack access to the internet or the skills needed to interact with AI-driven public
services. 
123

Page 124

If AI technologies are rolled out without addressing these issues, there is a risk of
widening existing inequalities, as those who are digitally excluded may be unable to
access essential services or participate fully in society. Addressing digital exclusion
is therefore crucial to ensuring that AI benefits all members of the community and
does not exacerbate the digital divide. This will include ensuring those already
excluded are not overlooked in the discussions and data collection around AI and will
focus on building public trust in AI and providing opportunities to learn about AI. 
7. Next steps
7.1. As the AI landscape continues to accelerate it is important for the Council to move
forward with preparation, planning and exploration of AI. Taking into account the
current limited capacity for change within the organisation and the financial
constraints expected over the coming years, AI could be a valuable tool to deliver
service benefits. 
7.2. The following proposed next steps are considered essential to putting the Council on
a positive footing for moving forward. These proposals are for organisation wide
activities and preparation. This does not preclude Resources to undertake targeted
tactical work in this area, as long as there is a commitment to work within the
developing guidance and governance. 
7.2.1. Microsoft CoPilot is a major player in the enterprise space for AI. It is built upon
ChatGPT and is being integrated into more and more Microsoft products, initially
across Microsoft 365. 
As explained within this report there are a number of barriers to overcome to
successfully and safely exploit the technology. Following several in-depth
discussions with the Digital Office, other councils and suppliers, it is proposed that a
Proof of Value (PoV) project be developed This would coincide with an aggregated
spend proposal for MS Copilot being developed by Crown Commercial Services
(CCS). 
The opportunity for joint working with the Digital Office, Improvement Service and
other Councils will be explored as part of the PoV. 
This PoV project will explore the benefits of Copilot, with success metrics including
reductions in administrative processing time and improvements in report accuracy
and officer time to prepare. 
A detailed business case is being developed. This is more challenging than simply
testing Copilot as there are a range of prerequisites that will need to be in place to
ensure it is safe and secure to use. 
7.2.2. Customer Contact is another area of interest given it’s benefit to both the citizen and
the Resources. Increasingly seamless voice AI-services are available, with HMRC’s
tax helpline a good example of that. 
It is proposed that discussions commence with existing suppliers to explore what is
available within our current technology estate to enable a more rapid Proof of Value
undertaking. A proposal or business case for this is expected to be ready for Q1
2025/26.  
124

Page 125

7.2.3. It is important to have the correct guardrails in place to ensure our exploration,
evaluation and use of AI is safe and secure. It is proposed that an Artificial
Intelligence Policy be created in the short term to provide that guidance from a
technical, governance and security perspective for the use of AI. This should be
ready for review during Q1 2025/2026. 
7.2.4. Data is a key enabler for successfully adoption of AI. It is also a key enabler for wider
transformation of business intelligence, processes and customer experience.
Following discussion with Legal Services, it is proposed that a cross-Resource group
be formed, currently expected to report into the current Information Governance
Board, to develop and execute activities to assess current data maturity, quality and
stewardship before development of an action plan to increase these three areas.
This is a long lead time activity and so the group should be formed as soon as
possible in 2024. 
A draft Terms of Reference is included in Appendix 2 for information. 
7.2.5. Staff skills and capability requirements are unknown at this time with regards to
evaluation and operation of AI.  It is proposed that one outcome from the planning for
each of the other proposed next steps provides recommendations on skills and
capabilities with a view to developing staff over time, and potential need for short
term resourcing of these activities. 
In the near term however, it is expected that additional skills may need to be brought
in from external sources to provide, project officer capacity, specialist data skills and
process improvement (Business Analyst skills). This would be incorporated into the
wider Digital Transformation activity on skills, capabilities and resourcing of change. 
8. Employee Implications
8.1. AI has the potential to impact employees negatively and positively. It is important
that employees and Unions are consulted appropriately where there is uncertainty or
potential for impact, in advance of any change. 
8.2. To mitigate potential negative impacts, the Council will explore reskilling programs
and consider redeployment opportunities to ensure that AI complements rather than
replaces human roles. 
9. Financial Implications
9.1.  Adopting AI represents a financial commitment by the Council as part of a strategic
journey toward long-term efficiencies.  There will be technical costs to the adoption
of AI, training and staffing costs are also possible. 
10. Other Implications
10.1. There are implications around unknown inherent bias within certain areas of AI which
could have impacts for decision making. 
10.2. There is a risk that adoption of AI will negatively impact the digital exclusion gap and
therefore must be a key consideration when evaluating and assessing the
appropriateness of AI in certain scenarios.  
125

Page 126

11. Integrated Impact Assessment and Consultation Requirements
11.1. Integrated Impact Assessments and consultations will be undertaken as part of
individual project activity as required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 August 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs 
 Working with and respecting others 
 Accountable, effective, efficient and transparent 
 Ambitious, self-aware and improving 
 Fair, open and sustainable 
 Excellent employer 
 We will work to put people first and reduce inequality 
 We will work towards a sustainable future in sustainable places 
 We will work to recover, progress and improve 
 Our children and young people thrive 
 Good quality, suitable and sustainable places to live 
 Thriving business, fair jobs and vibrant town centres 
 Caring, connected, sustainable communities 
 People live the healthiest lives possible 
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Murray Husband, Head of IT Services
Ext: 5648 (Tel: 01698 455648)
E-mail:  murray.husband@southlanarkshire.gov.uk 
126

Page 127

Appendix 1 
Below is the expanded list of examples along with links to relevant publications, case
studies, or similar sources for each use case. 
1. Content Creation:
a. Brent Council - AI-driven content creation tools for social media and website
content 
Utilises AI-driven content creation tools to generate social media posts and
website content. This allows for timely communication with residents, ensuring
that important information is shared quickly and efficiently without
overwhelming staff. 
b. Bristol City Council - Automation of routine reports 
Employs AI tools to automate the creation of routine reports, such as budget
summaries and performance reviews. This automation reduces the time
required to compile these documents, enabling staff to focus on more
strategic planning and analysis. 
c. Manchester City Council - AI tools for drafting public consultation documents: 
Has experimented with AI tools to draft initial versions of public consultation
documents and policy briefs, ensuring consistency and saving time in the
initial stages of document preparation. 
2. Repetitive Actions: 
a. North Lanarkshire Council - RPA for administrative tasks: 
Uses Robotic Process Automation (RPA) to handle routine administrative
tasks like processing council tax payments, updating records, and managing
routine customer queries. This has significantly increased operational
efficiency and reduced errors. 
b. Sunderland City Council - RPA for housing inspections: 
Implemented RPA for automating the scheduling and notification processes
for housing inspections and maintenance requests, streamlining operations
and reducing the administrative burden on staff. 
c. Lambeth Council - AI in processing FOI requests: 
Automates the handling of Freedom of Information (FOI) requests through AI,
which categorizes and processes requests faster and more accurately than
manual methods. 
3. Increase Utilisation/Efficiency: 
a. Glasgow City Council - AI for waste collection optimization: 
127

Page 128

Uses AI to optimize waste collection routes by analysing data on waste
generation patterns, leading to more efficient scheduling and reduced fuel
costs. 
b. Sheffield City Council - Predictive maintenance using AI: 
Employs AI-driven predictive maintenance systems for public infrastructure,
such as roads and bridges. By predicting when maintenance is required, the
council can plan interventions more effectively, reducing downtime and
extending the lifespan of assets. 
c. Cambridge City Council - AI to optimize energy usage: 
Utilises AI to optimise energy usage in public buildings by analysing
consumption patterns and adjusting heating, cooling, and lighting systems
accordingly. This initiative has led to significant cost savings and a reduction
in carbon emissions. 
4. Customer Contact: 
a. Enfield Council - "Amelia" AI chatbot: 
Introduced "Amelia," an AI-powered chatbot that assists residents with
inquiries about housing, benefits, and council services. The chatbot handles
high volumes of queries, providing instant responses and freeing up human
agents for more complex tasks. 
b. Leeds City Council - AI-driven virtual assistant for phone inquiries: 
Implemented an AI-driven virtual assistant that interacts with residents over
the phone, handling routine inquiries and directing more complex issues to
human operators. This system has improved response times and customer
satisfaction. 
c. Newcastle City Council - AI-powered text messaging system: 
Uses AI-powered text messaging systems to keep residents informed about
service changes, such as waste collection schedules or road closures. The
system personalizes messages based on resident preferences, increasing
engagement and satisfaction. 
5. Data Analysis: 
a. Leeds City Council - Predictive analytics in social services: 
Leverages AI for predictive analytics in social services, analysing data to
forecast demand for services like childcare, elderly care, and housing
assistance. This allows the council to allocate resources more effectively and
anticipate future needs. 
b. London Borough of Hackney - AI for analysing crime trends: 
Uses AI to analyse data from multiple sources to identify trends in crime and
anti-social behaviour. This information is used to inform policing strategies
128

Page 129

and community interventions, leading to more targeted and effective
responses. 
c. Birmingham City Council - AI for transportation data analysis: 
Employs AI to analyse transportation data, including traffic patterns and public
transport usage, to optimize transit routes and improve urban mobility. The
insights gained from AI analysis are used to enhance service delivery and
reduce congestion. 
129

Page 130

Appendix 2 - SLC Data Quality Group – Draft Terms of Reference 
1 Review Title Data Quality Group
2 Background Data is a key enabler for successfully adoption of AI. It
is also a key enabler for wider transformation of
business intelligence, processes and customer
experience. 
Following discussion with Legal Services, it is proposed
that a cross-Resource group be formed, currently
expected to report into the current Information
Governance Board, to develop and execute activities to
assess current data maturity, quality and stewardship
before development of an action plan to increase these
three areas. This is a long lead time activity and so the
group should be formed as soon as possible in 2024. 
2 Identified Issues  The Data Quality Group serves to be the driver for
increasing data maturity across the Council. This
subgroup of the Information Governance Board is
dedicated to elevating data quality and stewardship
across the council.
Identified
Outcome(s) 
• Developing and implementing comprehensive
data management standards to ensure
consistency and reliability of data across all
departments.
• Providing strategic guidance and tools for
ongoing data quality improvement.
• Fostering a culture of data-driven decision
making within the council through education and
policy development.
• Increasing the data maturity of the organisation to
enhance overall operational effectiveness and
service delivery. 
3 Scope of Review • Assessment of Current Data Practices: Conduct
audits to identify gaps in data quality and
compliance; evaluate current data management
frameworks.
• Standards Development: Establish clear
guidelines and protocols for data quality and ensure
these are integrated into daily operations.
• Tools and Training: Deploy effective tools for data
management and provide necessary training to staff
to elevate their data handling capabilities.
• Data Improvement Advice: Act as a consultative
body to departments, advising on best practices and
strategies for data management. 
• Data Maturity Enhancement: Develop a strategic
plan to progress through levels of data maturity,
focusing on governance, quality, architecture, and
analytics.
130

Page 131

• Collaborative Efforts: Collaborate with internal and
external stakeholders to synchronise data
management efforts and share best practices. 
4 Resources affected: -
Community
and
Enterprise
Education Finance and
Corporate
Housing and
Technical
Social Work
X X X X X
5. Trade Union, Personnel Team, and Management Engagement 
Legal Services, IT Services, Information Security, Resources are all required
to engage and support the group. 
6 Key aims of/outcomes from project 
Service/operational To act as the driver for increasing data maturity across
the Council
Employee To increase the data literacy of the employees 
Other Provide a foundation for digital transformation  
7 Key milestones 
• Assessment of current data maturity – Q3/Q4 2024/25
• Data Quality improvement plans – Q4 2024/25
• Policy & Procedure updates – Q1 2025/26
• Training and development plans – Q1 2025/26
• Guidance for Resources – Q1 2025/26
8 Monitoring and reporting arrangements 
Bi-Monthly meetings 
Monitoring:
• Provide updates to IGB on progress on action plans aligned to IGB
frequency
• Provide 6 monthly updates to CMT on overall data quality and progress 
9 CMT Sponsor / Lead Officer 
Murray Husband, Head of IT
10 Project resourcing 
The project will require support from –
• Legal Services
• IT Services
• Information Security
• Resources 
131

Page 132

132

Page 133

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject:    Developing an Age Friendly South Lanarkshire ‘A great
place to grow older’ 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the development of Age-Friendly South Lanarkshire
 advise on the role of the Community Planning Partnership Board (CPPB) in
supporting this development
 advise on the work undertaken by Seniors Together in South Lanarkshire in
taking the programme forward 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that the content of this report is noted.
[1recs]
3. Background
3.1. The age-friendly community is one where people of all ages can participate in
activities and where everyone is treated with respect, regardless of their age; a place
that makes it easy for older people to stay connected to those important to them; a
place that helps people stay healthy and active, even at the oldest ages; and a place
that provides appropriate support to those who can no longer look after themselves.  
3.2. The development of an Age-Friendly South Lanarkshire, and the achievement of
membership of the UK Network and World Health Organisation’s Global Network of
Age Friendly Communities, evidences the positive approach being taken to reduce
discrimination across the local authority area. 
3.3. Being an age-friendly community is about considering and applying the needs of
older people when taking decisions about improving both the physical and social
environment.  For South Lanarkshire Council this means designing services and
facilities alongside older people, not just on their behalf, which is the aim of the
Seniors Together Network in South Lanarkshire. 
4. Seniors Together 
4.1. Seniors Together is a network of organisations working in partnership across South
Lanarkshire to change attitudes and services with the aim of improving society for
older people.  
15
133

Page 134

4.2. A key priority of the network is to ensure older people’s voices are heard and that
they are given the opportunity to inform decision making where possible. To do this,
the network aims to meet the diverse needs of older people by understanding their
requirements and ensuring information and activities are organised around them. 
4.3. Case studies developed by Seniors Together are available to demonstrate what an
age-friendly activity looks like, for example, the South Lanarkshire Men’s Shed
Project is an example of one activity commonly known and which has been
extremely successful. 
4.4. Further research and meetings with similar networks in England and Ireland found
that the age-friendly activities being undertaken as part of the Seniors Together core
programme aligned to other national projects. 
4.5. Following agreement from the Executive Committee in February 2023 for South
Lanarkshire Council to apply to join the UK Network of Age Friendly Communities,
membership was granted in March 2023.  A further application to join the World
Health Organisation’s Global Network of Age Friendly Communities was granted in
July 2023. 
5. Current Position
5.1. Seniors Together first approached the Council in August 2022, with the proposal of
making South Lanarkshire an age-friendly community, as it was identified the Council
was already delivering activities and supports for older people that was, in part,
meeting the requirements of the World Health Organisation (WHO) Global Network
of Age Friendly Communities.  These activities included: 
• Educating and providing advice and guidance to the community partnerships on
the four stages of planning required to build an Age Friendly South Lanarkshire.
• Representing the Council at national events including the UK Age Friendly
Communities Network, and the WHO Global Network of Age Friendly
Communities.
• Establishing four Older People’s Assemblies in South Lanarkshire and effectively
working with the Older People’s Champion across a range of older people’s
networks and local community groups.
• Working collaboratively with South Lanarkshire Leisure and Culture to develop
and implement activity programs that promote health and wellbeing initiatives,
including the use of Fitbits during the pandemic to promote and increase older
people’s mobility.
• Establishing a Seniors Together Executive Group with representatives from the
Council, South Lanarkshire Leisure and Culture, Police, Fire, and the voluntary
sector, such as Age Scotland, who meet to discuss, develop and provide support
and guidance on how to ensure policy and procedures take cognisance of older
people.
• Developing and introducing the first Men’s Shed in South Lanarkshire, introducing
the first mobile Men’s Shed during the pandemic, and supporting the Men’s Shed
network grow to its current size of 14 sheds across South Lanarkshire.
• Promoting partnership working across South Lanarkshire communities by
identifying and bringing together older people’s community groups.
134

Page 135

5.2. Since 2022, Seniors Together have continued to drive this work forward and in
March 2023, when the Council agreed to become an Age Friendly Community,
Seniors Together where invited to join the Community Planning Partnership Board
(CPPB) to represent older people to ensure they are included in the development of
action plans from their local CPPB’s. This has been well received and is proving to
be successful in ensuring older people have the opportunity to input in to matters
directly affecting them. 
5.3. Immediate actions from the Progress Group, that are being progressed by the
Seniors Together Project Manager and the Lead Officer from the Progress Group,
include the following:- 
• to undertake a mapping exercise to review tools currently used by the
Community Planning Partnership when working with neighbourhood planning
that can align with age-friendly community planning. This is complete and the
WHO checklists have been identified as the most suitable tool to engage with. 
• development of online resources for Council staff to increase knowledge of age-
friendly communities. This has begun with the launch of eLearning.
• co-production of eLearning modules with South Lanarkshire Council’s Learning
and Development Team and members of Seniors Together. Module one is
complete and available on Fusion Learning.
• consideration of how an audit of age-friendly activity across the Council can be
undertaken. Work on this will begin once data has been gathered from the WHO
checklists following engagement with older people’s community groups through
2024/25 and 2025/26. 
6. The Scottish Older Peoples Assembly (SOPA)
6.1. The SOPA will assist in the development of an age-friendly communities’ network in
Scotland.  The aim is to work with local authorities who are in the development stage
to assist them through the process, and to encourage as many local authorities as
possible to become age-friendly.   
6.2. Local authorities who have already developed an Age Friendly Community Network
are sharing their knowledge at regular network meetings to support other local
authorities become age-friendly. Given South Lanarkshire Council were recognised
as the first age friendly local authority in Scotland, the Seniors Together Project
Manager regularly attends national network meetings to provide updates on
developments across South Lanarkshire, to share best practice, and provide
information and advice to other local authorities striving for the same recognition.  To
date, the local authorities currently age-friendly are: 
• South Lanarkshire
• South Ayrshire
• Perth & Kinross 
7. Employee Implications
7.1. There are no employee implications of this report. 
8. Financial Implications
8.1. There are no additional financial implications of this report.
135

Page 136

9. Climate Change, Sustainability and Environmental Implications
9.1 There are no Climate Change, Sustainability and Environmental Implications
associated with this report. 
10. Other Implications
10.1. There are no other implications contained within this report. 
11. Integrated Impact Assessment and Consultation Arrangements
11.1. There is no requirement for an integrated impact assessment. 
Jackie Tayor
Executive Director (Finance and Corporate Resources) 
1 October 2024 
Link(s) to Council Objectives
 Accountable, effective, efficient, and transparent
 Fair, open, and sustainable
 Improve life and prospects for everyone 
 Ensuring inclusion, equity and equality
 Focused on people and their needs 
 Working with and respecting others 
Previous References
 None 
List of Background Papers
Building a city for all ages:  A Strategy for an Age Friendly Bristol 2022 
https://www.ageuk.org.uk/bp-assets/globalassets/bristol/services/age-friendly/final-age-
friendly-bristol-strategy.pdf 
The World Health Organisation’s Age-friendly Communities framework
https://extranet.who.int/agefriendlyworld/age-friendly-cities-framework/   
Contact for Further Information
If you would like further information, please contact: - 
Tracy Ferguson, Learning, Organisational Development and Diversity Manager
Tel: 01698 454715
Email: tracy.ferguson@southlanarkshire.gov.uk 
136

Page 137

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 11 December 2024
Report by: Chief Executive  
Subject: Programme for Government 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide a summary of the Scottish Government’s Programme for Government
2024/2025 and key items relevant to local government 
2. Recommendation(s)
2.1. The committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted. 
3. Background
3.1. At the beginning of September each year, the Scottish Government publishes its
Programme for Government (PfG) which sets out its key legislative and policy priorities
for the year ahead. 
3.2. The 2023 PfG was structured around ministerial portfolios; the 2024 PfG presents the
government’s plans under the four key priorities of eradicating child poverty, growing
the economy, tackling the climate emergency, and ensuring high quality and
sustainable public services. 
3.3. This report focuses on the plans and commitments set out in the PfG 2024 which are
likely to have direct implications for local government. 
4. Local Government implications
4.1. Of the circa 187 commitments featured in the PfG, just over 100 can be considered to
have implications for local government.  These are itemised in appendix 1 along with
an assessment of how South Lanarkshire will approach them and keep Elected
Members informed of developments and progress. 
4.2. By way of summary, the following headline actions are of particular significance for
local government. 
Eradicating Child Poverty
 Working with local partners to pool budgets and streamline reporting
requirements, where possible, with clear local plans in place for delivering shared
outcomes
 Work with local authorities to increase take up of funded early learning and
childcare for eligible 2-year-olds, with a particular focus on boosting take up
among the families most at risk of poverty and areas with some of the lowest take
up rates 
16
137

Page 138

 Over the next two years we will design and deliver a new childcare offer, backed
by £16 million, for priority families within six ‘Early Adopter Communities’ –
aligned with our fairer futures partnerships and offering easier access to the
support families need
 Prioritise funding to increase the pay of workers in adult social care who are
delivering direct care in commissioned services, early learning and childcare
workers delivering funded hours, and children’s social care workers, so that they
are paid at least the Real Living Wage from April 2025
 Work towards further expanding free school meals to those in receipt of the
Scottish Child Payment in Primary 6 and Primary 7, and provide £21.75 million
for free school meal alternatives in all school holidays for eligible families
 Investing nearly £600 million in affordable housing in 2024-25. The majority of
this will be directed at boosting social housing supply – keeping rents lower and
benefitting around 140,000 children in poverty each year
 This includes up to £40 million to bring existing homes into affordable use through
acquisitions, and where appropriate also bring long term voids back into effective
use
 Committing £100 million to grow with institutional investment to at least £500
million, supporting the construction of around 2,800 mid-market rent homes
 Providing £2 million in additional support to local authorities facing the most
significant and sustained temporary accommodation pressures to maximise the
use of existing housing stock and minimise turnaround times for vacant social
homes
 Tackling the challenge of unoccupied housing by updating guidance to
encourage councils to focus their resources on homes that have been empty for
longer than 12 months. We will also consult on modernisation of the compulsory
purchase system to help deliver a wide range of projects in the public interest,
including bringing empty properties back into productive use
 Through our Housing Bill, boost tenants’ rights and include provisions for long-
term rent controls. The Bill will place stronger duties on local authorities and other
partners to prevent homelessness – including an emphasis on prevention through
holistic support, with relevant bodies working together to provide assistance
earlier to help people avoid the crisis of homelessness 
Growing the Economy
 Support the development of business clusters in areas where Scotland has a
competitive advantage such as data, digital and AI, health and life sciences,
advanced manufacturing, and the energy transition
 Empower decision making and investment through Regional Economic
Partnerships, including pilot work on regional funding as part of wider public
service reform to support Glasgow City’s ambitions to create a metropolitan
region, and Edinburgh’s Regional Economic Prosperity Framework
 Launch a planning apprenticeship programme to invest in new talent to create a
pipeline of skilled future planners
 Advance the use of the Community Wealth Building model – an approach to local
economic development that aims to create new employment opportunities and
help local businesses to expand – by bringing forward a Community Wealth
Building Bill and developing a local authority led practice network to aid
consistency and practice sharing
 Lead a new, national approach to skills planning and work with partners to
strengthen regional approaches – bringing employers, colleges, universities, and
other partners together to ensure the system is responsive to regional and
national skills needs  
138

Page 139

 Connect over 20,000 premises to gigabit capable broadband in areas of market
failure by March 2025, through delivery of three regional, multi-year contracts
with Openreach
 Support local authorities to implement the Visitor Levy – helping enhance the
tourist experience and benefit local communities and their economies
 Conduct a review of all the community rights to buy – which give communities
more options than ever before to take ownership of land and assets – reporting
in December 2025 
Tackling the Climate Emergency
 Bring forward a Heat in Buildings Bill that is deliverable and affordable for
households and businesses, setting the long-term direction of travel and, in turn,
providing certainty to building owners and the supply chain
 Set a route map for enabling the delivery of approximately 24,000 additional
public electric vehicle charge points by 2030 to support the ongoing move to
electric vehicles
 Make it easier for people to walk, wheel, or cycle on everyday journeys through
our Active Travel Infrastructure Fund, the National Cycle Network, and People
and Place Programme
 Take forward a range of action to bolster climate adaptation through our
forthcoming National Adaptation Plan – including establishing new local
partnerships, tailoring approaches to adaptation to the needs of local areas,
providing new sector specific support for businesses on climate resilience, and
providing practical support for the development of climate-resilient local
development plans
 Support the transition to a more circular economy by reforming Extended
Producer Responsibility for packaging, increasing reuse and recycling through a
new codesigned Household Recycling Code of Practice with local authorities, and
consulting on a charge on single use beverage cups
 Bring forward a Natural Environment Bill to establish the framework for statutory
targets to restore and protect nature. It will also include provisions to modernise
the way in which national parks and deer are managed, and provide powers to
update environmental impact assessment and habitats legislation to support
delivery of our net zero and biodiversity goals 
Ensuring High Quality and Sustainable Public Services
 Supporting education authorities and schools to reduce absence and improve
attendance, and monitoring data regularly and taking further targeted action
where needed
 Accelerating progress in closing the poverty-related attainment gap, through the
Scottish Attainment Challenge, and by intensifying action to deal with the ongoing
impacts of the pandemic on children’s progress
 Continue to work with COSLA to identify options for the removal of non-residential
care charges as part of wider work with partners on social care improvement. 
 Continue work to establish the National Care Service by the end of this
Parliamentary term to reform how social work, social care and community health
is delivered, improving standards, quality and fairness
 Deliver Anne’s Law by the end of this Parliamentary term to ensure that the rights
of residents in care homes and their families are upheld and legislate to give
carers a right to breaks
 Provide local authorities with £145.5 million to protect teacher numbers, having
delivered a 14.6% increase in teachers’ pay between 2022 and 2024  
139

Page 140

 Continue work to Keep the Promise by consulting on the next stages of reform of
the children’s hearing system, future of foster care, and the support available to
those moving on from care
 Continue to make progress towards concluding the joint review of local
governance by the end of this Parliamentary session – this includes developing
single authority models with local government and health partners to strengthen
and streamline local decision making, and support a shift towards more
preventative public services
 Work with partners and COSLA to strengthen Community Planning Partnerships
to shift the balance in how public services are designed and delivered towards
prevention 
4.3. The PfG also includes the legislative programme for 2024/2025, comprising the
following new Bills. 
 Adults with Incapacity
 Budget (No. 4)
 Building Safety Levy
 Climate Change (Emissions Reduction Targets)
 Community Wealth Building
 Criminal Justice Modernisation and Abusive Domestic Behaviour Reviews
 Crofting
 Leases (Automatic continuation etc.)
 Heat in Buildings
 Misogyny
 Natural Environment
 Post-School Education Reform
 Prisoners
 UEFA EURO 2028 
5. Programme for Government 2024/2025 – South Lanarkshire context
5.1. As in previous years, an exercise has been undertaken to consider the commitments
highlighted in the Programme for Government 2024/2025 as outlined in Section 4
above. 
5.2. Using the list of commitments identified in appendix 1, each Resource has considered
where the focus of activity is for the council; identified the actions that are being taken
or will be considered in respect of these; and a timeline/reporting route for these
actions. 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment implications
arising from this report.  
140

Page 141

9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. Consultation was undertaken internally on the Resource Planning Guidance through
an officer group with representation from all Resources. 
Paul Manning
Chief Executive 
24 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Ambitious, self-aware and improving 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
141

Page 142

Appendix 1
PfG Commitments with Local Government implications 
COMMUNITY AND ENTERPRISE RESOURCES 
Eradicating child poverty: Early, preventative interventions
• Provide employability support to meet the needs of all parents or carers on a demand-led basis – ensuring closer working across childcare,
education, housing, justice, and health services, so that people can quickly and easily access the support needed to enter and stay in work. 
Focus Actions Timeline and reporting
Deliver the Tackling Child Poverty element of
the South Lanarkshire Local Employability
Partnership’s Annual Investment Plan
• Expand the focus of the Supporting
Families programme to deliver early-stage
employability and health and well being
supported to targeted families
• Deliver the Aim to Achieve programme to
support parents in low wage / part-time
employment to increase their income from
employment
• Establish a childcare focused sub-group of
the employability partnership to maximise
take up of financial support for childcare for
unemployed parents
Ongoing delivery and reporting through CER
Committee and No-one Left behind / Scottish
Government processes 
Eradicating child poverty: Improving incomes and cutting cost of living
• Work with local authorities to ensure as many children as possible can access their free bus entitlement – cutting travel costs and making
sustainable travel a more attractive option. 
• Work towards further expanding free school meals to those in receipt of the Scottish Child Payment in Primary 6 and Primary 7 and
provide £21.75 million for free school meal alternatives in all school holidays for eligible families. 
Focus Actions Timeline and reporting
Continue to offer Young Scot National
Entitlement Cards to all school pupils.
• Work with Schools to promote the benefits
of using the Young Scot National
Entitlement Cards including free bus travel
for under 22-year-olds. 
The number of young people who have been
issued a Young Scot National Entitlement
Card is reported annually in Transport
Scotland’s Scottish Transport Statistics.
142

Page 143

Continue to roll out free school meals to all
primary school children.
• Implement the roll out of further expansion
of free school meals to Primary 6 and
Primary 7 pupils in receipt of the Scottish
Child Payment.
To be implemented from February 2025 and
reported via Resource and Service plan
reporting arrangements. 
Eradicating child poverty: Warm, safe, place to call home
• Working with local authorities to accelerate development of strategic sites such as Granton, unlocking opportunities for investment and
economic growth and the provision of new homes of all tenures. 
• Ensuring the planning system responds to the housing emergency. We will support planning authorities to allocate a pipeline of land for new
homes and promote consistent monitoring of its delivery. We will also work to extend the services offered by our new Planning Hub to
support housing developments. This could for example focus on the delivery of homes on larger, legacy, and stalled sites.
Focus Actions Timeline and reporting
The preparation of the Local Development
Plan 3 (LDP3) will identify a 10-year Local
Housing Land Requirement to meet all tenure
housing needs of the Council’s area and
allocate sites in appropriate locations, in
particular by taking an infrastructure first
approach. The associated delivery programme
will set out the pipeline (phasing) of land for
new homes and identify any constraints. 
NB: We don’t have any stalled strategic sites
at the moment. 
• Carry out an annual Housing Land Audit to
identify sites that are stalled and the
reasons for the lack of progress. 
• Progress preparation of an evidence based
LDP3 with a focus on delivering place-
based investment. 
• Support the Council’s affordable housing
provision through on-site delivery on private
housing developments and identifying
appropriate sites for development by the
Council and Registered Social Landlords
(RSLs).
Report LDP3 evidence report to Full Council in
quarter one 2025/26 prior to submission to
Scottish Ministers for gatecheck. 
Adoption of LDP3 by end 2027.
The delivery of the East Kilbride and Hamilton
Masterplans will make a material contribution
to meeting the housing targets in the South
Lanarkshire Council’s area.
• Progress the delivery stages of both
masterplans working in partnership with
stakeholders across both town centres.
Prepare East Kilbride for redevelopment by
early 2027. 
Bring forward phased development proposals
in Hamilton Town centre. 
143

Page 144

Progress for both will be reported to Executive
Committee. 
Promoting entrepreneurs and innovators
• Maximise the impact of our £42 million Techscaler programme, Scotland’s national network of startup support – extending access for
Scottish entrepreneurs to some of the world’s best start-up development programmes. We will integrate the Techscalers with other centres
of innovation, creating opportunities for Scottish companies to raise capital, learn from world leading peers, and access new markets. 
• Increase the number of women starting and scaling businesses by implementing key recommendations of Ana Stewart and Mark Logan’s
review of gender equality in entrepreneurship. This will include a regional programme in partnership with South of Scotland Enterprise to
create new, best-in-class, environments for women to create and scale businesses, and a competitive Pathways Fund to widen participation
in entrepreneurship from people in groups that are currently under-represented. 
• Support the development of business clusters in areas where Scotland has a competitive advantage such as data, digital and AI, health and
life sciences, advanced manufacturing, and the energy transition. 
Focus Actions Timeline and reporting
Women in business - helping parents back
into work through working with the Business
Gateway to run targeted events. 
Rural – targeted support for businesses in the
rural area of South Lanarkshire through a
bespoke programme of business support
(currently in Lesmahagow). 
BAME (Black, Asian and Minority Ethnic) –
The Council’s Economic Development service
is reviewing current service delivery to reflect
the scale and requirements of this business
group. 
Work with partners across the city region to
secure funding and support the growth of all
these sectors.
• Continue to work with Business Gateway
to ensure that all groups have access to
the appropriate level of support to grow
businesses. 
• Identify and seek to address disparity in
accessing support and creating sustainable
businesses. 
• Work with key partners including the City
Region and Clyde Gateway to deliver on
key opportunities to attract investment.
This work is underway and will be embedded
in our support for businesses within South
Lanarkshire. 
144

Page 145

Make full use of our potential workforce and remove barriers to employment
• Lead a new, national approach to skills planning and work with partners to strengthen regional approaches – bringing employers, colleges,
universities, and other partners together to ensure the system is responsive to regional and national skills needs.
• Reform the education and skills funding system so it is easier to navigate and responsive to learners and skills priorities – breaking down
silos and reducing bureaucracy – introducing a Bill to simplify the post-school funding body landscape.
• Support those already in work, help more people back into work, and address long-term economic inactivity. Alongside our national
employability offer, this includes improving access to health services by April 2025, and introducing enhanced specialist support for disabled
people across all 32 local authorities by Summer 2025. 
Focus Actions Timeline and reporting
Respond to national developments that
support the Council close the skills gaps in
key areas.
• Continue to engage with all partners.
• Consider how the national approach
can be utilised effectively at local level.
• Promote new approaches and
opportunities internally across all
Resources.
• Consider where the new approach can
align with workforce and succession
planning
• 
Once the new approach is designed and
available.
Work with college partners to deliver work based
learning to senior phase pupils and employability
participants 
• Deliver the GradU8 and Foundation
apprenticeship programmes with South
Lanarkshire College, New College
Lanarkshire and Glasgow Kelvin
College
• Contribute to Glasgow City Region
discussions around devolution of skills
funding / planning 
• Work with South Lanarkshire College
toi deliver the NOLB funded Academy
programme to deliver skills based
learning to employability participants 
Ongoing – reported through CER and
Education Committee 
145

Page 146

Implement a new approach to post-school
education and skills funding 
• Continue to participate in Scottish
Government consultations
• Continue to engage with relevant
external stakeholders.
• Communicate changes to internal
stakeholders.
• 
Once the Bill has been approved and any
subsequently processes have been developed
and are available. 
Support the businesses that create jobs and wealth
• Empower decision making and investment through Regional Economic Partnerships, including pilot work on regional funding as part of
wider public service reform to support Glasgow City’s ambitions to create a metropolitan region, and Edinburgh’s Regional Economic
Prosperity Framework. 
• Establish Scotland’s first Planning Hub to build capacity and resilience, and to improve consistency and efficiency in decision-making. The
Hub’s initial priority will be to help planning authorities make quicker decisions on hydrogen planning applications, with a plan to support
wider developments including good quality homes and onshore wind.
• Support early adopters to deliver Masterplan Consent Areas – these will frontload some consents including planning permission in defined
areas, making them more attractive to investors and supporting the delivery of major projects, including national developments, Green
Freeports, and green data centres. 
• Launch a planning apprenticeship programme to invest in new talent to create a pipeline of skilled future planners.
Focus Actions Timeline and reporting
South Lanarkshire’s Planning Service will work
with the Scottish Government in the
development of the proposed Planning Hub to
ensure it provides the benefits being
promoted. 
Adoption of Masterplan Consent Areas will be
considered through the preparation of LDP3. 
A range of opportunities to widen the skills
base of planners can be explored.
• Collaborate with Heads of Planning
Scotland to design and deliver the Planning
Hub. 
• Explore the desirability of creating
Masterplan Consent Areas. 
• Investigate the opportunities offered by the
new planning degree course to be offered
by the University of the West of Scotland
(UWS) in early 2025.
Work on the proposed Planning Hub and the
planning degree course at UWS will be
ongoing through the remainder of 2024/25. 
The creation of Masterplan Consent Areas will
be reviewed as part of the preparation of
LDP3.
146

Page 147

Work with partners across the city region to
secure funding and support the growth of all
these sectors
• Work with key partners including the City
Region and Clyde Gateway to deliver on
key opportunities to attract investment
Ongoing programme of activity with progress
update reports to committee. 
Invest in infrastructure critical to the economy
• Connect over 20,000 premises to gigabit capable broadband in areas of market failure by March 2025, through delivery of three regional,
multi-year contracts with Openreach. 
Focus Actions Timeline and reporting
Supporting Scottish Government and directing
the rollout of superfast broadband to high
issue areas to improve coverage.
• Liaise with Scottish Government in quarterly
meetings. 
• Continue to make progress with the rollout
of superfast broadband across South
Lanarkshire.
Quarterly reporting on the rollout of superfast
broadband via Resource and Service Plan
arrangements. 
Creative industries and rural and visitor economies
• Review the way the culture sector is supported, including a review of Creative Scotland as part of our commitment to ensuring excellence in
Scotland’s public services. This will also help to ensure the distribution of additional funding in the most effective way possible. 
• Invite Scotland’s culture sector to join a partnership on Scottish festivals to focus on how best to support Scotland’s festivals and uphold
their vital role within the sector. 
• Maintain our commitment to increase funding for culture and the arts so that it is at least £100 million more a year by 2028-29. 
• Support local authorities to implement the Visitor Levy – helping enhance the tourist experience and benefit local communities and their
economies. 
• Continue to implement the Strategy for Sustainable Growth of the agritourism sector and support Scottish Agritourism as they prepare for
the World Agritourism Conference in Scotland in 2026. 
Focus Actions Timeline and reporting
The delivery of the East Kilbride Masterplan
could make a material contribution to the
cultural offering in the South Lanarkshire
• Progress the delivery stages of the
masterplan, working in partnership with
stakeholders across the town centre.
Prepare East Kilbride for redevelopment by
early 2027. 
147

Page 148

Council area, via the potential development of
new cultural space.
Progress will be reported to Executive
Committee.
The suitability for a Visitor levy in South
Lanarkshire will be kept under review in
consultation with the tourist sector. 
Work is ongoing across the rural area to
explore opportunities for existing businesses
to grow, based on existing opportunities and
emerging opportunities such as Clydesdale
Way.
• Continue to work with Business Gateway
to ensure that all groups have access to
the appropriate level of support to grow
businesses. 
Ongoing 
Progress a renewables revolution
Improve the planning and consenting regime for renewable energy generation and electricity transmission to provide certainty to the market
and stimulate the private investment needed, including:
• Improving the consistency and pace of the consenting process for proposals over 50 MW, ensuring we are resourced and able to meet
demand, and reducing timescales for section 36 and 37 determinations.
• Introducing pre-application community and stakeholder engagement guidance for transmission developments, improving public engagement
and confidence in consenting processes.
Focus Actions Timeline and reporting
As an area that experiences a large number of
onshore renewable proposals the Planning
Service will seek to take a lead role in
discussions on the development of these
proposals. 
• Collaborate with Heads of Planning
Scotland and the Scottish Government on
the changes proposed. 
• Explore ways to upskill planning officers to
deal with these types of development.
Ongoing throughout the remainder of 2024-25. 
Supporting households and communities with reducing their emissions
• Set a route map for enabling the delivery of approximately 24,000 additional public electric vehicle charge points by 2030 to support the
ongoing move to electric vehicles. 
148

Page 149

• Progress our ambition of a 20% reduction in car use by 2030, with a route map including a timeline for implementing ‘demand
management’. 
• Make it easier for people to walk, wheel, or cycle on everyday journeys through our Active Travel Infrastructure Fund, the National Cycle
Network, and People and Place Programme. 
Focus Actions Timeline and reporting
Manage, maintain and expand public electric
vehicle charging infrastructure in line with
available external funding sources.
• Work to continue with the Regional
Collaboration Initiative to expand public
electric vehicle charging infrastructure
across the west.  The Council will enter into
local authority agreement to appoint a
consultant to take forward the proposed
commercial operator model.
Ongoing through 2024-25 with quarterly
updates reported via the Resource and
Service Plan reporting arrangements. 
Deliver prioritised improvements to bus and
rail infrastructure. 
• Continue to work in partnership with
Network Rail to deliver new infrastructure to
complement the East Kilbride Rail
Enhancement project.  This includes
pedestrian / cycle connections, bus
interchange and priority system as well as
park and ride facilities including electric
vehicle/bus charging infrastructure. 
• Progress the land purchase agreement with
Network Rail to allow the future delivery of
the next phase of the Lanark Interchange
Project for a new bus station.    
Ongoing through 2024-25 with quarterly
updates reported via the Resource and
Service Plan reporting arrangements. 
149

Page 150

Deliver walking and cycling projects / schemes
in line with agreed 2024/25 external capital
funding programme.
• Deliver new walking and cycling
infrastructure as part of the East Kilbride
Rail Enhancement project.  This includes
pedestrian and cycle connections at the
new Hairmyres Station as well as on the
surrounding road network on the approach
to the station. 
• New pedestrian crossing facilities will also
be provided on Burnbank Road in Hamilton. 
Ongoing through 2024-25 with quarterly
updates reported via the Resource and
Service Plan reporting arrangements. 
150

Page 151

Accelerating action on adaptation
• Take forward a range of action to bolster climate adaptation through our forthcoming National Adaptation Plan – including establishing new
local partnerships, tailoring approaches to adaptation to the needs of local areas, providing new sector specific support for businesses on
climate resilience, and providing practical support for the development of climate-resilient local development plans. 
• Support the transition to a more circular economy by reforming Extended Producer Responsibility for packaging, increasing reuse and
recycling through a new codesigned Household Recycling Code of Practice with local authorities, and consulting on a charge on single use
beverage cups.  
Focus Actions Timeline and reporting
Develop the Council’s response to climate
adaptation and become a more climate-
resilient local authority. 
• Develop climate change risk register with
greater focus on adaptation. 
• Support the delivery of Climate Ready
Clyde's (CRC) Adaptation Strategy. 
• Carry out adaptation framework capability
assessment. 
• Deliver adaptation training to SLC Officers
and Steering Groups.
• Adaptation actions are included within the
Council’s Sustainable Development and
Climate Change Strategy and will be
reported to the Climate Change and
Sustainability Committee at quarter two and
quarter four. 
Improving domestic recycling rates and
reducing the amount of residual waste
produced by households in South Lanarkshire.
• Piloting new communal bin infrastructure
with funding from Scottish Government’s
Recycling Infrastructure Fund. 
• Redesignating and relaunching recycling
services at flatted developments to improve
capture rates and quality of recyclable
materials. 
• Project commenced in June – pilot area in
Springhall. Extended to Mansion area in
Cambuslang in September 2024.   
• The project to redesignate recycling bins at
flats commenced in 2023-24 with
surveys/data gathering. Project will be
completed by end of 2024-25. Progress is
reported in Service Plan updates. 
• The review of kerbside services is ongoing
and proposals are currently being
developed. Progress is reported at CMT
151

Page 152

• Reviewing kerbside collection services to
more closely align with the new Household
Recycling Charter Code of Practice. 
and through the Facilities, Waste and
Ground service plan. 
SLC is responding to the Scottish
Government’s consultation on charging for
single-use disposable beverage cups. 
The Council’s Trading Standards service is
also contributing to the discussions at a
national level via the Society of Chief Officers
of Trading Standards Scotland on the
enforcement of any charge introduced on the
sale of single use cups.
• Awaiting amended legislation to know what
actions will be required. 
• The Council will respond to the Scottish
Government consultation on Charging for
single-use disposable beverage cups by
November 14, 2024. 
• Any legislation which is brought forward
will be rolled out as directed. 
Halting and reversing the biodiversity decline in our landscapes and seas
• Bring forward a Natural Environment Bill to establish the framework for statutory targets to restore and protect nature. It will also include
provisions to modernise the way in which national parks and deer are managed and provide powers to update environmental impact
assessment and habitats legislation to support delivery of our net zero and biodiversity goals. 
• Restore at least 10,000 hectares of degraded peatland and create at least 10,000 hectares of woodlands, which will include over 4,000
hectares of native woodland. 
• Deploy nature restoration funding through over 50 projects across Scotland – including work to restore our temperate rainforests and to
protect sea bird colonies on our islands. 
Focus Actions Timeline and reporting
Protect, enhance and respect South
Lanarkshire’s natural environment.
• The Council’s Biodiversity Strategy (2024-
2030) and Biodiversity Duty Implementation
Plan (2024-2026) follow guidance from the
Scottish Biodiversity Strategy and form a
framework for incorporating relevant
statutory targets stemming from the Natural
Environment Bill. 
Reported at quarter two and quarter four to
the Climate Change and Sustainability
Committee. 
152

Page 153

• The Council’s Biodiversity Strategy (2024-
2030) and Biodiversity Duty Implementation
Plan (2024-2026) sets out how biodiversity
will be protected and enhanced. The focus
of the plans and the Biodiversity Partnership
is on an ecosystem approach to restoration
and includes woodland and peat. The plan
highlights the progress that has been made
and future objectives. 
• The Council has signed the Clyde Climate
Forest Concordat, a commitment to
promote and actively expand the Clyde
Climate Forest (CCF). Targets to increase
canopy cover to 20%, increase the average
broadleaf network to 20% and increase
woodland cover in the Glasgow City region
to 20% by 2032. 
• Working in partnership with Glasgow and
Clyde Valley Green Network in establishing
our Nature Networks to be incorporated into
South Lanarkshire’s LDP3. 
• Our ‘Making space for Pollinators’ report
highlights the work we have achieved and
states our future objectives in alliance with
the Scottish Pollinator Strategy.
Report to the Climate Change and
Sustainability Committee in quarter four. 
Report to Scottish Government every three
years within Biodiversity Duty Report (last
report December 2023). 
Report annually to NatureScot on the progress
we have made in South Lanarkshire for the
Scottish Pollinator Strategy.  
• Continue to identify projects to improve our
Local Nature Reserves and greenspaces for
nature through the annual Scottish
Government Nature Restoration Fund. 
Annual report to Scottish Government
(NatureScot). 
153

Page 154

Prioritising prevention and tackling health inequalities
• Collaborate across the four nations on banning the sale of single use vapes and the UK Tobacco and Vapes Bill, which will progressively
increase the age at which people can buy cigarettes and restrict the promotion of vapes – working to ensure that Scotland is tobacco free by
2034.  
Focus Actions Timeline and reporting
Trading Standards is contributing to the
discussions at a national level on the UK
Tobacco and Vapes Bill via the Society of
Chief Officers of Trading Standards Scotland. 
Annual programme of enforcement checks on
business compliance in relation to the
distribution and sale of vaping products.
• Awaiting amended legislation to know what
actions will be required. 
• 125 businesses visited during 2023-24, and
test purchase projects planned for 2024-25.
Any legislation which is brought forward will be
rolled out as directed. 
Update on 2023-24 programme reported to
Community and Enterprise Committee on 17
September 2024. Further reports will be
provided on the 2024-25 programme of
enforcement. 
154

Page 155

EDUCATION RESOURCES 
Eradicating child poverty: Early, preventative interventions
• Ensure access to affordable, high-quality funded early learning and childcare services by continuing to invest almost £1 billion a year. If
eligible families paid for this themselves, it would cost them more than £5,500 per eligible child per year.
• Work with local authorities to increase take up of funded early learning and childcare for eligible 2-year-olds, with a particular focus on
boosting take up among the families most at risk of poverty and areas with some of the lowest take up rates.
Focus Actions Timeline and reporting
Delivery of the 1140 hours entitlement for 
all eligible children 
Increasing the uptake of funded entitlement for
eligible 2-year-olds
• Within South Lanarkshire, all children can
access their entitlement to 1140 hours from
the Monday following their third birthday.
Over 7,500 children currently access their
entitlement across local authority and
funded provider provision. 
• Significant levels of work have taken place
with the Scottish Government and DWP to
issue direct communications and other
related information to families identified as
likely to meet the criteria for a funded 2-
year-old place. Partnership working has
also taken place with Health Visiting Teams
to reconfirm the criteria to allow Health
Visitors to provide further advice to parents
around eligibility. This has resulted in a
significant increase in eligible 2-year-old
children accessing places across local
authority and funded provider provision. 
Progress in this area is monitored in detail
through the council’s quarterly performance
review system (Improve) and in related reports
to committees. 
Eradicating child poverty: Whole family place-based approach
155

Page 156

• Taking a community-based approach to developing a future national childcare offer, which focuses on reducing costs and helping parents
take up work or increase their hours. Over the next two years we will design and deliver a new childcare offer, backed by £16 million, for
priority families within six ‘Early Adopter Communities’ – aligned with our fairer futures partnerships and offering easier access to the support
families need.
• Investing in innovative, local projects to tackle child poverty, through a second round of our Child Poverty Practice Accelerator Fund.
Focus Actions Timeline and reporting
Continue to update our childcare offer to help
eradicate child poverty
• South Lanarkshire Council is not involved in
this pilot programme.
• We will monitor national progress closely
and seek to align any new offer to our
existing provision. 
N/A 
Eradicating child poverty: Boost fair work and employment
• Improve careers support so that there is better information on career choices, including potential job prospects and earnings, and
connecting students, schools, and employers. 
• Invest in community-based youth work, focussed on reaching young people outside the classroom and supporting access to education,
training, and employment.
• Continue work to improve access to higher education for students from the most socioeconomically disadvantaged communities – towards
our goal of 20% of all entrants being from the 20% most deprived communities by 2030.
Focus Actions Timeline and reporting
Working with colleagues in Community and
Enterprise Resources Employability Service to
deliver a range of senior phase work -based
learning programmes and targeted
employability support.
• Deliver the Foundation Apprenticeship and
GradU8 programmes in partnership with
local colleges 
• Deliver keyworker-based support and
training to young people in the last 6
months of school through the Aspire
programme 
Progress in this area is monitored in detail
through the council’s quarterly performance
review system (Improve) and in related reports
to committees. 
156

Page 157

Improve standards and access across public services
Improve attendance, attainment, and the curriculum in schools to boost standards, including:
• Supporting education authorities and schools to reduce absence and improve attendance, and monitoring data regularly and taking further
targeted action where needed. 
• Implementing the new Relationships and Behaviour in Schools Joint Action Plan 2024-27, reporting annually on progress. 
• Accelerating progress in closing the poverty-related attainment gap, through the Scottish Attainment Challenge, and by intensifying action to
deal with the ongoing impacts of the pandemic on children’s progress. 
• Implementing the Curriculum Improvement Cycle, with work underway on maths and numeracy, led by the National Mathematics Specialist
Adviser. 
• Progressing qualifications reform, and improving and diversifying our approach to assessment, including removing written exams from some
practical subjects in 2025-26. 
• Reforming our national education bodies to drive improvement. This includes a redesigned Education Scotland with a primary focus on the
curriculum, a Centre for Teaching Excellence, replacing the Scottish Qualifications Authority with Qualifications Scotland, and creating a
new independent inspectorate – all tasked with raising standards. 
Focus Actions Timeline and reporting
Supporting Head Teachers in improving
school attendance through a combination of
effective strategies, resources and partnership
working. 
Progress implementation of the new
Relationships and Behaviour in Schools Joint
Action Plan 2024-27, reporting annually on
progress. 
Continued focus on closing the poverty related
attainment gap 
Raising the attainment of pupils in the senior
phase and closing the poverty related
attainment gap
• Create a comprehensive support system
that empowers Head Teachers to effectively
tackle attendance issues and promote a
culture of regular attendance in their
schools.
• Deliver a programme of professional
learning opportunities to Head Teachers
resulting in improved understanding and
enhanced confidence in schools.  This will
upskill staff in Attendance data handling,
focus on engagement techniques,
understanding barriers to learning and
implementing restorative practices.
• Continue to deliver on the 5 workstreams
created as part of our Strategic Equity Fund
plan as follows: pedagogy, curriculum,
Monitored within the Education Resource Plan
2024-2027 with progress reported in detail
through the council’s quarterly performance
review system (Improve) and in related reports
to committees. 
Timelines will reflect the national publication
dates for ACEL data collected in November,
March and June as well as formal qualification
results. 
157

Page 158

Providing a rich and stimulating curriculum
that helps raise standards in literacy and
numeracy 
Meaningful participation in the national reform
agenda. 
learner engagement, strengthening
relationships and learner pathways.  Each
workstream is underpinned by a robust use
of data and includes high quality
professional learning as well as a clear
focus on outcomes and measures to secure
improvement for children and young people
most impacted by poverty.
• Establishments will continue to deliver on
their equity planning using Pupil Equity
Funding.  All planning takes account of the
locally authority stretch aims and
governance structure.  Data will be
collected 3 times over the year and
analysed to ensure we are in line with our
trajectories for 2024/25.
• Review and amend local policy guidance
against new national guidance related to the
joint action plan, e.g. approaches to anti-
bullying, gender-based violence
• Further develop approaches to supporting
workforce capacity and wellbeing, e.g. from
de-escalation training and emotion coaching
• Use a range of approaches, including the
HWB survey to monitor progress
• Further develop targeted support
approaches, e.g. NAIT to support P1
transition for children with ASN
• Set ambitious stretch aims in reading,
writing and numeracy to speed up, measure
and assess progress in closing the poverty
related attainment gap.
158

Page 159

• Track the progress of individual learners
three times per year to secure improvement
and share better practice.
• Embed the principles and practices within
our Framework for Numeracy and
Mathematics to enhance numeracy skills
and mathematical understanding across all
educational stages.
• Work with national agencies, including
participation in relevant consultation
processes and working groups to progress
and inform planned reforms in assessment
and inspection. 
Valuing the public sector workforce
• Provide local authorities with £145.5 million to protect teacher numbers, having delivered a 14.6% increase in teachers’ pay between 2022
and 2024. 
Focus Actions Timeline and reporting
Ensuring that there are sufficient and
adequate levels of teachers within our schools
and that available funding is utilised
effectively.
• Work within the corporate body to review,
analyse and assess expenditure on
teachers and related provision. 
Revenue budget monitoring reports are
presented to committee in line with corporate
process. 
Modern environments for learning and working
159

Page 160

• Start construction of a further eight projects through the Learning Estate Investment Programme. By the end of 2027-28, this will have seen
47 modern, state of the art school building projects opened, contributing to increasing the proportion of pupils being educated in good or
satisfactory buildings from 61% in April 2007 to 90.7% in April 2023.
Focus Actions Timeline and reporting
Maintaining our excellent learning estate  • South Lanarkshire Council is not involved in
this phase of the programme.
• We will continue to monitor and maximise
any available funding 
Capital budget monitoring reports are
presented to committee in line with corporate
process. 
Protect and promote equality and human rights
• Continuing to develop and embed social justice, rights, and equalities across education, through implementation of both our Learning for
Sustainability Action Plan to 2030 and the recommendations of the Anti-Racism in Education Programme.
Focus Actions Timeline and reporting
Focus on ‘climate change and sustainability’
as a core priority in our Resource Plan. 
Work to “empower leaners to shape and
influence actions on climate change and
sustainability”. 
Progress the intention of the national Learning
for Sustainability Action Plan 
• Ongoing regular meetings of the Youth
forum with a focus on 24/25 project targets. 
• Active Participation in Community Planning
Partnership events and engagement with
elected members.
• Conference of Schools (COS3) event led by
and delivered to young people.
• Youth Forum on Climate Change and
Sustainability created in 2021 which has
engaged in both its own work and council
projects, participated in community
partnership events and met with senior
politicians 
• All schools to encompass elements of
Learning for Sustainability somewhere
within their school improvement plan 24/25.
• Teacher the Teacher training delivered to
young people, with rollout discussions with
secondary teachers. 
Monitored within the Education Resource Plan
2024-2027 with progress reported in detail
through the council’s quarterly performance
review system (Improve) and in related reports
to committees. 
160

Page 161

• Secondary sector considering how to build
Learning for Sustainability into all subject
areas. 
• Creation of curriculum roadmap for primary
sector Learning for Sustainability
• Learning for Sustainability conference for
practitioners for early years, primary and
secondary. Awareness of UN Sustainable
Development Goals.
• Attending Education Scotland’s ‘Learning
for Sustainability Leads’ meetings 
161

Page 162

FINANCE AND CORPORATE RESOURCES 
Eradicating child poverty: Local flexibility to deliver
• Working with local partners to pool budgets and streamline reporting requirements, where possible, with clear local plans in place for
delivering shared outcomes.
• Ensuring a revised approach to service co-design – to design support services with communities, based on people’s need, to make it easier
for people to navigate and access the help on offer.
Focus Actions Timeline and reporting
The Council will continue to work with partners
as appropriate in the delivery of services
including consideration of the Marmot
approach.  
• Work with partners including members of
the Community Planning Partnership to
ensure that resources are directed
appropriately to deliver the agreed
outcomes of the Council Plan / Community
Plan/ Child Poverty Action Plan
Ongoing, with reporting as appropriate
through the CPP Board and partnership
forums.
Increase routes for communities to participate
in decision making and priority setting
• Review and report on the Community
Engagement and Participation Strategy
2020-2025.
• Develop new Community Engagement
and Participation Strategy
Review Jan-March 2025. Reporting to the
Community Planning Partnership Board and
Council June 2025. 
Co-design new strategy: Summer and Autumn
2025. Report to Community Planning
Partnership Board and Council Dec 2025. 
Eradicating child poverty: Early, preventative interventions
• Expanding place-based ‘fairer futures partnerships’ to five more areas (North Ayrshire, East Ayrshire, Perth and Kinross, Inverclyde, and
Aberdeen City) – alongside three existing ones – supporting innovative, local approaches to joined-up services that improve family
wellbeing, maximise incomes, and support people into work. This will build an evidence base and share approaches that can be transferred
to other parts of Scotland.
Focus Actions Timeline and reporting
Adopt a place-based approach to improving
health equity ‘to shift the balance in how public
services are designed and delivered towards
prevention’  
• Implementation of the Shaping Places to
Wellbeing Approach across South
Lanarkshire.
Activity to be planned across 2025-2027. 
Applied autumn 2024. Awaiting outcome.
162

Page 163

• Application to the Marmot Place
Programme. 
Eradicating child poverty: Improving incomes and cutting cost of living
• Invest an additional £1.5 million to expand advice in accessible settings, including community centres and hospitals, with eight new projects
this year. In its first year, the programme has helped over 5,500 people access financial gains of over £7.5 million.
• Provide £21.75 million for free school meal alternatives in all school holidays for eligible families. 
Focus Actions Timeline and reporting
Provide financial support to low-income
households
• Support households with the provision of
money and welfare rights advice to
maximise income 
• Provide multiple access routes for clients
• Provision of multiple payment support
mechanisms (e.g. Scottish Welfare Fund,
Cash First and food and fuel vouchers)
• Recording of the financial gains achieved
for clients
Ongoing throughout the remainder of 2024/25
Continue to support payment to children who
are entitled to free school meals across the
holiday periods throughout the financial year.
• Children who are entitled to a free school
meal receive a payment of £2.50 per day
over school holidays.
This is ongoing activity throughout the year in
line with the school calendar. The spend is
reported to Executive Committee as part of
the Cost of Living update. 
Make Scotland more attractive for investment
• Delivering a co-ordinated programme to attract investment in priority areas of net zero, housing, and infrastructure by implementing
recommendations from the Investor Panel and aligning government and public bodies behind this approach. An early focus will be improving
engagement with investors, strengthening our capacity and capability in delivery, and exploring new funding mechanisms such as blended
finance and guarantees.
Focus Actions Timeline and reporting
The Council is preparing a suite of shovel
ready projects, including in areas of net zero,
housing and infrastructure, which will allow it
to react effectively to market interest and
• Two examples of Council net zero projects
which will encourage private investment
are as follows:
Whilst these projects are being delivered with
partner organisations, funding bids have been
submitted for investment zone status from the
UK and Scottish Governments via Glasgow
163

Page 164

future funding opportunities through either
internal funds or more likely Scottish or UK
government funding. The delivery of projects
could be under a variety of models depending
on the individual circumstances including,
Council development, partnership working /
joint ventures, gap funding / grant support /
private investment. 
• The Conexus Hagshaw Energy
Investment Zone involves a partnership
with the landowners to create a
renewables hub/green energy business
park which will create employment
opportunities.
• Clyde Gateway GRID Campus involves
the construction of net zero manufacturing
space to attract high value manufacturing
businesses and jobs to the area. It will
also provide a demonstrator model for net
zero technology in an industrial capacity.  
City Region.  A decision is pending which
would allow these projects to deliver additional
activity at scale. 
Support the businesses that create jobs and wealth
• Advance the use of the Community Wealth Building model – an approach to local economic development that aims to create new
employment opportunities and help local businesses to expand – by bringing forward a Community Wealth Building Bill and developing a
local authority led practice network to aid consistency and practice sharing.
• Lay the draft Good Food Nation Plan before Parliament by the end of the parliamentary year and establish the Scottish Food Commission
along the same timeframe.
Focus Actions Timeline and reporting
Responding to national developments in
support of Community Wealth Building
• Advise CWB Commission of any
legislative developments and assess
implications for the South Lanarkshire
CWB strategy and approach
• Reflect legislation and guidance in the
annual refresh of the CWB action plan
which supports the CWB strategy, to
ensure it remains abreast of latest
developments
• Contribute to the local authority practice
network and continue to participate in
Reported through the CWB Commission
164

Page 165

national conversations and learning
around CWB
Maintain Council’s ‘Sustainable Food Place’
award.
• Create a Community Food Network that
will incorporate all aspects of good food
policy pillars including: health and
wellbeing, growing, community eating,
affordable food, food insecurity, food
dignity, whole systems working and
education and capacity building within the
community food sector.  
Commenced Autumn 2024 and ongoing 
Quarterly reporting to Community Planning
Partnership 
Creative industries and rural and visitor economies
• Through our Scottish Languages Bill, we will give official recognition to Gaelic and Scots and build on the measures that are already in place
in education, arts, media, and community and public life. The Bill will enable us to make further progress in creating a secure future for
Gaelic and Scots by ensuring more people can learn, speak, and use these languages.
• Conduct a review of all the community rights to buy – which give communities more options than ever before to take ownership of land and
assets – reporting in December 2025.
Focus Actions Timeline and reporting
Implement the South Lanarkshire Council
Gaelic Language plan 2025 - 2030
• Consider how the actions in the National
Gaelic Language Plan 2023-2028 can
support the development of the local plan.
• Involve/work with a range of Council
services to develop the local plan.
• Involve the local community in the
development of the local plan.
Plan approved for launch April 2025. 
Annual reporting to Bord na Gaidhlig once the
local plan is launched.
Support local communities to represent the
views of their neighbours and to work together
to address issues that matter to them by
growing their tools to do so: capacity,
resources, assets.
• Invest in Community Asset Transfer
Support for Communities.
• Encourage participation in any public
consultation relating to the Community
Rights to Buy review. (Note that the
Community Rights to Buy referred to here
Ongoing - Asset Transfer Applications are
submitted to Housing and Technology
Committee quarterly and annual public reports
on assets transferred are published online
each year by 30 June. 
165

Page 166

apply to privately owned properties and
fall under the Land Reform Act.  This is
separate from Community Asset Transfer
rights under the Community
Empowerment Act.)
Subject to Scottish Government review
method and Timescales. 
Prioritising prevention and tackling health inequalities
• Continue to make progress towards concluding the joint review of local governance by the end of this Parliamentary session – this includes
developing single authority models with local government and health partners to strengthen and streamline local decision making, and
support a shift towards more preventative public services.
• Work with communities to take forward the findings of the Democracy Matters national engagement exercise on the future of community
decision-making, responding in detail to the national consultation on the future of community decision-making. 
• Work with partners and COSLA to strengthen Community Planning Partnerships to shift the balance in how public services are designed
and delivered towards prevention. 
Focus Actions Timeline and reporting
The Resource will continue to monitor
progress of the joint review of local
governance and associated risks and
opportunities 
Provide regular updates on progress of
internally as required, including to Committee
where appropriate. Ongoing throughout
2024/25 
• Contribute to consultation and
engagement activity during the joint review
of local governance. The Resource will
continue to monitor progress of the joint
review of local governance and associated
risks and opportunities • Provide regular
updates on progress of internally as
required, including to Committee where
appropriate. Ongoing throughout 2023/24
Ongoing throughout 2024/25, subject to the
timeline of the review. 
Increase routes for communities to participate
in decision making and priority setting
• Development of Community Partnerships 
• Review and report on the Community
Engagement and Participation Strategy
2020-2025. 
Ongoing and reports to Community Planning
Partnership Board quarterly. 
Review Jan-March 2025. Reporting to the
Community Planning Partnership Board and
Council June 2025. 
166

Page 167

• Develop new Community Engagement
and Participation Strategy 
• Place Based Participatory Budgeting
programme 
• Completion of 10 Neighbourhood Plans 
• Consider how to work with all stakeholders
to take forward the findings of the ‘Let’s
Talk Democracy’ Engagement exercise
from Autumn 2023 and the findings of the
Scottish Government Review.
Co-design new strategy: Summer and Autumn
2025. Report to Community Planning
Partnership Board and Council Dec 2025. 
Undertake at 2 PB exercises in 2025. 
Complete final Neighbourhood Plan in 2025.
Present to Community Planning Partnership
Board in March 2025. 
Activity to be planned across 2025-2027. 
Participation in Scottish Government working
group forming recommendations. 
Adopt a place-based approach to improving
health equity ‘to shift the balance in how public
services are designed and delivered towards
prevention’
• Implementation of the Shaping Places to
Wellbeing Approach across South
Lanarkshire.
• Application to the Marmot Place
Programme 
Activity to be planned across 2025-2027. 
Applied autumn 2024. Awaiting outcome. 
Protect and promote equality and human rights
• Delivering our Disability Equality Plan – ensuring the voices of disabled people are at the centre of policy and decision making, including an
annual Cabinet meeting ‘takeover’ to facilitate meaningful and credible engagement with disabled people.
• Working with partners across the public and third sectors to embed anti-racism and advance the Race Equality Framework, including
delivery of the Anti-Racism Observatory.
• Accelerating action to ensure that Human Rights and Equality remains forefront in all the government and public sector does. We will
consult on and publish a framework to embed equality and human rights across the Scottish Government and the wider public sector. This
framework will include an action plan and toolkit, setting out practical steps to progress this ambition. This will be complemented by action to
enhance the effectiveness of the Public Sector Equality Duty.
167

Page 168

Focus Actions Timeline and reporting
Implement actions in the Scottish
Government’s Disability Equality Plan 
• Respond to consultation requests
• Consider how the actions from the
national Plan can be implemented at a
local level
• Involve/work with partner
organisations/local groups to develop
the local plan
• Involve Disabled People’s
Organisations in the planning and
design of policies
Once the plan is available
Use information available in the Anti-Racism
Observatory
• Use information available in the Anti-
Racism Observatory
• Publicise the availability of the Anti-
Racism Observatory Once available
• Use the information in the Observatory
when developing/reviewing policies and
practices and when carrying out impact
assessments
• Consider how the information impacts
on current practices, making changes
as appropriate
Once available
Implement actions from the Human Rights and
Equality framework
• Respond to consultation requests.
• Review relevant policies and processes
against the framework.
• Consider how the national framework
can be implemented at local level. 
Once the framework is available 
168

Page 169

HOUSING AND TECHNICAL RESOURCES 
Eradicating child poverty: Warm, safe, place to call home
• Investing nearly £600 million in affordable housing in 2024-25. The majority of this will be directed at boosting social housing supply – keeping
rents lower and benefitting around 140,000 children in poverty each year. 
• This includes up to £40 million to bring existing homes into affordable use through acquisitions, and where appropriate also bring long term
voids back into effective use
• Committing £100 million to grow with institutional investment to at least £500 million, supporting the construction of around 2,800 mid-market
rent homes. 
• Providing £2 million in additional support to local authorities facing the most significant and sustained temporary accommodation pressures to
maximise the use of existing housing stock and minimise turnaround times for vacant social homes. 
• Work with local authorities and registered social landlords on effective void management and a pragmatic approach to vacant property
refurbishment to help drive down void property levels at pace – supporting efficient housing management and increasing the supply of
available social and affordable homes. 
• Tackling the challenge of unoccupied housing by updating guidance to encourage councils to focus their resources on homes that have been
empty for longer than 12 months. We will also consult on modernisation of the compulsory purchase system to help deliver a wide range of
projects in the public interest, including bringing empty properties back into productive use. JR
• Working with local authorities to accelerate development of strategic sites such as Granton, unlocking opportunities for investment and
economic growth and the provision of new homes of all tenures. 
• Through our Housing Bill, boost tenants’ rights and include provisions for long-term rent controls. We will bring forward amendments to the Bill
that will clearly set out how rent increases will be capped in areas where rent controls apply, in a way that provides certainty for tenants while
also encouraging investment. The Bill will place stronger duties on local authorities and other partners to prevent homelessness – including
an emphasis on prevention through holistic support, with relevant bodies working together to provide assistance earlier to help people avoid
the crisis of homelessness. 
• Protecting residents by accelerating progress on cladding, commencing the newly passed Housing (Cladding Remediation) (Scotland) Act,
delivering assessment, risk mitigation and remediation measures in affected properties on a prioritised basis, and, subject to the devolution of
power, introducing legislation for a Scottish Building Safety Levy to raise funds for this effort.
Focus Actions Timeline and reporting
Investing nearly £600 million in affordable
housing in 2024-25. 
• Continue to deliver the council’s
Affordable Housing Supply
Programme (including the Market
The current programme is scheduled to run until 2027,
with regular updates reflecting progress, new
169

Page 170

• Increasing social housing supply
across South Lanarkshire in areas
of identified need through
management of national
Affordable Housing Supply
Programme funding. 
Support strategic regeneration initiatives
across South Lanarkshire’s town centres 
Purchase Scheme) to deliver 170
additional council homes in 2024/25. 
• Support Registered Social Landlord
Partners to deliver their own
development, ensuing alignment with
council’s own programme and
strategic priorities.   
Work with Planning and Economic
Development services to ensure
appropriate levels of affordable housing
provision are considered for inclusion
within town centre regeneration proposals
within East Kilbride and Hamilton.
opportunities and confirmation of grant funding for future
years. 
Progress against the delivery of the programme is
monitored through a range of published strategies and
reports, including: 
• Local Housing Strategy annual review
• Strategic Housing Investment Plan annual refresh
• Resource and Service Plans
• Community Plan
• Child Poverty Action Report 
Progress in relation to the masterplans is reported
regularly to Community and Enterprise Resources
Committee and Executive Committee.
Bringing existing homes into affordable
use through acquisitions and where
appropriate also bring long term voids
back into effective use.
• Utilising all available grant funding to
maintain affordability for the council in
relation to the delivery of new homes
and acquisitions. This includes recent
additional £1.7m provided to South
Financial monitoring of the programme is reported to
Executive Committee and Housing and Technical
Resources Committee as part of regular budget
monitoring. 
170

Page 171

Lanarkshire through the £40m
National Acquisition Programme. 
Supporting the construction of around
2,800 mid-market rent homes. 
• Housing and Technical Resources will
consider opportunities for mid-market
rent to be delivered as part of the
Affordable Housing Supply
Programme in conjunction with
Registered Social Landlord Partners.
Further detail is awaited from the Scottish Government
on proposals to support Mid-Market Rent development,
however progress against this will be reported through
the Local Housing Strategy annual review, scheduled for
Executive Committee in summer 2025. 
Sustained temporary accommodation
pressures.
• Will be used to offset additional
temporary accommodation costs and
maximise suitable temporary
accommodation.
Further details on the funding allocation awaited from
Scottish Government.
Effective void management and a
pragmatic approach to vacant property
refurbishment to help drive down void
property levels at pace.
• Void Service Improvement Plan
developed, implemented with
significant improvement in timescales
for completing voids and overall
reduction in number of live voids.
The management of voids is report on a weekly basis to
the Resource Management Team.
Tackling the challenge of unoccupied
housing (key focus on those lying empty
for more than 12 months).
• Continued delivery of the Empty
Homes process in conjunction with
Finance and Corporate Resources to
bring as many empty homes back into
use as possible. 
Progress in relation to tackling empty homes is reported
annually to Executive Committee through the Local
Housing Strategy annual review, as well as to Housing
and Technical Resources Committee and Scottish
Government through the annual refresh of the Strategic
Housing Investment Plan. 
Consult on modernisation of the
compulsory purchase system to help
deliver a wide range of projects in the
public interest.
• The Resource awaits details of the
proposed new system and will review
and respond to the consultation once
published. 
Response to the consultation will be submitted to the
Corporate Management Team for approval, with
discussion also taking place with the Chair of Housing
and Technical Resources.  
171

Page 172

Accelerate development of strategic sites. • Work with Planning and Economic
Development services to ensure
appropriate levels of affordable
housing provision are considered for
inclusion within town centre
regeneration proposals within East
Kilbride and Hamilton.
Progress in relation to the masterplans is reported
regularly to Community and Enterprise Resources
Committee and Executive Committee.
Housing Bill, boost tenants’ rights and
include provisions for long-term rent
controls 
• Continue to monitor progress of the
Housing Bill and any amendments.
Bill will progress into 2025 before receiving royal assent
as Act of the Scottish Parliament (ASP). 
The introduction of the Act will be reported to Housing
and Technical Resources Committee with any anticipated
resource implications.
Placing stronger duties on local
authorities and other partners to prevent
homelessness
• Continue to monitor progress of the
Housing Bill and any amendments.
Bill will progress into 2025 before receiving royal assent
as Act of the Scottish Parliament (ASP). 
The introduction of the Act will be reported to Housing
and Technical Resources Committee with any
anticipated resource implications.
Protecting residents by accelerating
progress on cladding, commencing the
newly passed Housing (Cladding
Remediation) (Scotland) Act, delivering
assessment, risk mitigation and
remediation measures in affected
properties on a prioritised basis, and,
subject to the devolution of power,
introducing legislation for a Scottish
Building Safety Levy to raise funds for
this effort.
• Inspection or remedial works to council
properties is conducted through the
Housing Investment Programme. 
• Issues identified within multi-tenure
buildings are raised directly with owner
occupiers and solution for all parties
agreed. 
Progress in relation to the Housing Investment
Programme is reported to Housing and Technical
Resources Committee. 
Further details on the proposed Levy are awaited,
including Resource implications for council services.   
Make full use of our potential workforce and remove barriers to employment
172

Page 173

• Work with local authorities and Registered Social Landlords to acquire suitable homes for key workers, where they are required, in rural and
island communities by making available up to £25 million from the Affordable Housing Supply Programme to support the five-year Rural
Affordable Homes for Key Workers Fund.  
Focus Actions Timeline and reporting
Support partners and community groups to
access funding opportunities to expand
accommodation options in rural Clydesdale.
• Through the development and updating of
Rural Action Plans, Housing and Technical
Resources will work with local community
groups across Clydesdale to further
understand demand for specific
accommodation needs, as well as
exploring national funding opportunities to
deliver on this.
Progress against this area will be monitored
and reported through the Local Housing
Strategy annual review, submitted to
Executive Committee in summer 2025. 
Prioritising prevention and tackling health inequalities
• Prioritise crime prevention initiatives, implementing our Violence Prevention Framework, and maximising the impact of our £7 million
Cashback for Communities programme. 
• Act on the recommendations of our independent expert working group on antisocial behaviour, who will report at the end of 2024. 
Focus Actions Timeline and reporting
Act on the recommendations of our
independent expert working group on
antisocial behaviour, reporting at the end of
2024. 
• Delivering South Lanarkshire’s Anti-social
Behaviour Strategy 2024-29, developed in
partnership between South Lanarkshire Council
and Police Scotland
• Work with partners to support people to
behave responsibly in their attitude to
alcohol and are educated in relation to the
impact of drugs
• Work with partners to support people to
behave responsibly in relation to fire safety
• Work with partners to ensure domestic
noise has less impact on people’s lives
• Work with partners to ensure that litter and
household waste is reduced, improving the
safety and attractiveness of communities
• First annual review by Spring 2025
173

Page 174

• Work with partners to ensure that people
can live safely in communities, with levels
of disorder reduced
• Work with partners to ensure that services
for people affected by anti-social behaviour
are easily accessible
Prioritise crime prevention initiatives,
implementing our Violence Prevention
Framework, and maximising the impact of our
£7 million Cashback for Communities
programme.
• The ASB Strategy 2024-29 prioritises
prevention through taking measures which
are likely to create a physical and social
environment where anti-social behaviour is
much less likely to arise.  Such measures
can start before the anti-social behaviour is
evident through a programme of proactive
elements such as CCTV and a strong
focus on education, support, community
engagement, and the creation of strong
sustainable family environments. 
• First annual review by Spring 2025 
Protect and promote equality and human rights
• Delivering the New Scots Delivery Plan (2024-2026), working with COSLA and the Scottish Refugee Council to ensure Scotland maintains its
international reputation as a welcoming nation for refugees and those seeking asylum. 
Focus Actions Timeline and reporting
Support the implementation of the New
Scots Delivery Plan (2024-2026)
• Continue to support and welcome
refugees through the range of well-
established programmes and
successful partnership approach.
• Progress against this area will be monitored and reported to
Resource Management Team and Housing and Technical
Resources as/when required.
Supporting households and communities with reducing their emissions
• Bring forward a Heat in Buildings Bill that is deliverable and affordable for households and businesses, setting the long-term direction of
travel and, in turn, providing certainty to building owners and the supply chain. 
174

Page 175

Conclude the review of our New Build Heat Standard in response to concerns raised regarding the use of woodburning stoves and
bioenergy. We expect to conclude the review and make any agreed legislative amendments by December 2024. 
Focus Actions Timeline and reporting
Facilitate the just transition to
decarbonised heating across the
council’s domestic estate and work with
partners to support private building
owners to do the same.
• Work with internal services and
partners to deliver net-zero heating
solutions as part of all new homes
within the council’s Affordable
Housing Supply Programme.   
• Await outcome of amendments to the
New Build Heating Standard and
implement as appropriate.
Progress on this area will be reported through the Local
Heat and Energy Efficiency Strategy to Climate Change
and Sustainability Committee annually, alongside the
annual review of the Local Housing Strategy. 
175

Page 176

SOCIAL WORK RESOURCES 
Eradicating child poverty: Boost fair work and employment
• Prioritise funding to increase the pay of workers in adult social care who are delivering direct care in commissioned services, early learning
and childcare workers delivering funded hours, and children’s social care workers, so that they are paid at least the Real Living Wage from
April 2025.
Focus Actions Timeline and reporting
Maximise employability routes and pipelines to
increase workforce supply across Social Care 
• Establish the Care Academy in South
Lanarkshire to ‘grow our own’ workforce
and avoid a skills gap in the future
years 
2022-2025 – regular reporting to Social Work
Resources Committee
Redesign of existing staffing structures and
skill-mix required to deliver operational
services 
• Implement the Social Work Workforce
Plan 2022 – 2025 with a particular
focus on workforce supporting looked
after children and specialist supports for
children at risk of coming into care
• Care at Home service modernisation to
reflect existing and new demands within
the service
• Implement a new 10-year contract with
Care at Home commissioned providers
from 1 July 2024. 
Ongoing – regular reporting to Social Work
Resources Committee 
Whole Family Wellbeing (WFW) to reduce the
need for crisis intervention, and a shift towards
prevention and early intervention
• Extend the Pathfinder initiative in
schools
• Contribute to the Family Support Hub
model across the four localities in South
Lanarkshire 
• Invest in the parenting support
groupwork pathway
• Extend Family Group Decision Making
(Children 1st) 
Ongoing - regular reporting to Social Work
Resources Committee
176

Page 177

Eradicating child poverty: Improving incomes and cutting cost of living
• Help around 100,000 carers eligible for Carer Support Payment – including, for the first time, some carers in full-time education – and
through the Carer’s Allowance Supplement. 
• Launch Pension Age Disability Payment, the third of our major disability benefits, and Carer’s Additional Person Payment.
Focus Actions Timeline and reporting
Support carers to access the Carer Support
Payment 
• Carers commissioned services
supporting carers to access a range of
funding / grants.
Reporting quarterly to SMT and annually to
Social Work Resources Committee on
supports provided to carers by commissioned
carer organisations
Implementation of the Carers Strategy 2023-26 Action
Plan (Carers Strategy 2023-2026 Carers and caring -
South Lanarkshire Council) 
• Enhance the uptake of Adult Carer
Support Plans (ACSP) and Young
Carer Statements for those with
identified. support needs. 
• Support carers to target resources that
meet local eligibility indicators.
• Develop a Shared Lives scheme in
conjunction with the Carer
organisations.
• Support carers to source and access
appropriate short breaks relevant to
their needs.
2026 – regular reporting to Integration Joint
Board (IJB) and Social Work Resources
Committee
Ensure the Adult Disability Payment continues
to meet the needs of disabled people
• Support the Social Security Scotland’s
Disability Payment process with
information as requested.
Progress updates to Social Work Resources
Committee as required 
Make full use of our potential workforce and remove barriers to employment
• Support those already in work, help more people back into work, and address long-term economic inactivity. Alongside our national
employability offer, this includes improving access to health services by April 2025 and introducing enhanced specialist support for disabled
people across all 32 local authorities by Summer 2025. 
Focus Actions Timeline and reporting
177

Page 178

Implement the Social Work Workforce Plan
2022-2025
• Manage workforce demands through a
review of recruitment practices to
extend and promote a career within
social care by using a flexible approach
and utilising employability routes. 
• Maintain employee health and well-
being to ensure the workforce feel
valued and supported.
Regular workforce updates to Social Work
Resources Committee
Maximise the use of available policies to
ensure the Council delivers best practice and
achieves our legal equality duties of
eliminating discrimination, harassment, and
victimisation; advancing equality of
opportunity; and fostering good relations 
• Mainstream equalities throughout all
services by treating service users and
employees with fairness and ensuring
their wellbeing is a priority.
• Offer reasonable adjustments within the
workplace to support employees with
disabilities.
• Support mental health at work through
early intervention, employee
counselling, occupational health
support and workplace mediation.
• Encourage staff to contribute to the
Employee Network that meets quarterly
to discuss matters regarding:
o Ethnicity
o Disability
o LGBT (Lesbian Gay Bisexual
Transgender)
o Caring role
• Use equality data to ensure the Council
has fair and open recruitment practices. 
Regular workforce updates to Social Work
Resources Committee and reporting to the
Equality Opportunities Forum annually 
178

Page 179

Strengthen the performance of our National Health Service
• Providing £120 million of additional funding for NHS Boards to support continued improvements across a range of mental health services
and treatments, including meeting the Child and Adolescent Mental Health Services waiting times standard nationally, with backlogs cleared
by December 2025.
Substantially reducing delayed discharges, working with local health and social care partnerships to: 
• Reduce variation in practice across different parts of Scotland so that people are discharged from hospital as soon as they are ready to
leave, making sure they can get the care they need at home or in the care setting they are living in.
• Ensuring partners work together to support effective discharge that will enable the best recovery in the most appropriate place, with targeted
improvement support in the areas with the highest delays. 
• Reducing hospital admissions by providing the right care in the right setting, including through Hospital at Home which prevented over
10,000 older people spending time in hospital during April to December 2023, relieving pressure from A&E and the Scottish Ambulance
Service and improving patient outcomes.
Focus Actions Timeline and reporting
Improve accessibility to mental health support
and services to children and young people 
• Utilise the Scottish Government
Community Mental Health and
Wellbeing Fund to support children and
young people improve their mental
health and wellbeing. 
• Enhance community-based mental
health initiatives for our children and
young people with services including: 
o Kooth, an online wellbeing and
counselling support service
o Blues programme
o Peer support programmes in
schools 
o Trauma Recovery Service to
support those who are care
experienced
• Develop a ‘Pathway’ for young people
who are ready to leave care in
2024 – 2025 with ongoing reporting to Social
Work Resources Committee
179

Page 180

collaboration with mental health support
services. This approach has been led
by the School Nursing Team.
Work in partnership to support Discharge
Without Delay to make positive changes and
improvements for staff and patients 
• Home First teams based within
localities continue to adopt a
reablement approach, working with
Allied Health Professionals (AHP)
colleagues to optimise independence of
service users for up to a period of 6
weeks 
• Hospital Social Work presence within
acute hospital sites to support:
o Operation FLOW 
o Hospital @ Home (Frailty)
o Rapid Discharge Support
o Admission Avoidance
• Implement the 24/72 rule with NHS
partners requesting support on
discharge to ensure safe, speedy
discharge as close as possible to the
Planned Date of Discharge.
• Work with partners to support the roll
out of the Optimal Discharge Target
Operating Model (TOM) which aims to
streamline the patient discharge
process and improve overall patient
experience.
Ongoing with regular reports to IJB and Social
Work Resources Committee 
Access to intermediate care for people with
rehabilitation potential to support a range of
choice and options to live well in the
community 
• Deliver state of the art care to the wider
population of South Lanarkshire from
Blantyre LIFE, providing access to
transitional care for individuals requiring
short term asset based support that will
enable them to regain independence 
180

Page 181

and return home following a period of ill
health or crisis.
• Blantyre LIFE campus will continue to
facilitate visits from other local
authorities, partnerships, and
universities to demonstrate the
progressive model in practice.  The
partnership will also continue to
showcase the work at key conferences.
• The Campus is becoming a focus for
the South Lanarkshire University Health
and Social Care Partnership (South
Lanarkshire University HSCP) to work
with universities to align research and
learning with direct practice. Initial
engagement work, for example, with the
National Robotarium at Heriot Watt
University has identified the site as a
“living lab” which will provide
opportunities to work together to test
care models which will bring benefit to
not just South Lanarkshire citizens, but
potentially contribute to wider academic
and practice learning. 
Improve standards and access across public services
• Improving outcomes for victims, survivors and witnesses of crime across Scotland – providing £16 million in the 2024 to 2025 period through
the Victim Centred Approach Fund to support 23 organisations to provide practical and emotional support.
• Supporting victims and witnesses to get the support they need, by introducing training on trauma for staff across the justice system.
Focus Actions Timeline and reporting
181

Page 182

Justice Services are committed to increasing
an early intervention and trauma informed
approach to working with young people
• Implement a Whole System Approach
(WSA) supports for young people aged
16-21 who find themselves in conflict
with the law.  The service provides bail
support, bail supervision, diversion from
prosecution, structured deferred
sentence, CSO and CPO supervision.
• Ensure safe placement of all young
people within a secure care setting or
within HMP/YOI Polmont (on remand or
when serving a sentence). 
Ongoing – regular reporting to Social Work
Resources Committee 
Supporting victims and ensuring the safety of
persons harmed
• Provide a holistic approach through the
Caledonian Programme to ensure
programmatic work addresses
inappropriate behaviour but also
supports those impacted by the
behaviour.  
• The Caledonian Systems Delivery
Team (CSDT) work in partnership with
CIRCLE and Women’s Aid South
Lanarkshire East Renfrewshire
(WASLER) to offer support to women
and children affected by domestic
abuse.
Ongoing – regular reporting to Social Work
Resources Committee 
Sustainable reduction in the prison population
• Changing the eligibility criteria for home detention curfew (HDC) and deploying GPS technology for use with HDC.
• An independent review of sentencing and penal policy, looking at how both imprisonment and community interventions are used, to reduce
reoffending through meaningful rehabilitation and keep our communities safe.
Focus Actions Timeline and reporting
Reduce reoffending through meaningful
rehabilitation 
• Justice Services will work in partnership
with SACRO as part of the Alcohol and
Drug Partnership arrest referral,
Ongoing – regular reporting to Social Work
Resources Committee 
182

Page 183

diversion, and bail supervision
commissioned service.  This aims to
support those with substance use
issues at the point of police custody,
court appearance and diversion with
peer mentors and assertive outreach
into recovery communities. 
• The Alcohol and Problem-Solving Court
in Hamilton Sheriff Court, supported by
the Recovery Orientated Justice
Service (ROJS), aims to address
substance use related offending whilst
taking a public health approach that
prevents further criminalisation of
vulnerable people whose offending is
related to addiction. 
A Scotland where people live longer, healthier and fulfilling lives
• Deploying digital technologies to modernise services, including launching the first version of a personalised digital health and social care
service which, over 5 years, will provide digital notifications, access to personal health information, and options for interacting online with
health and social care services.
• Continue to work with COSLA to identify options for the removal of non residential care charges as part of wider work with partners on social
care improvement.
• Continue work to establish the National Care Service by the end of this Parliamentary term to reform how social work, social care and
community health is delivered, improving standards, quality and fairness. 
• Deliver Anne’s Law by the end of this Parliamentary term to ensure that the rights of residents in care homes and their families are upheld
and legislate to give carers a right to breaks.
Focus Actions Timeline and reporting
Optimise independence through the use of
Technology Enabled Care (TEC)
• South Lanarkshire’s TEC team will work
with partners on an Amazon Healthcare
Telecare Project that will include a test
to link smart speakers to digital alarm
2024/25 – ongoing reporting to Social Work
Resources Committee and IJB
183

Page 184

receiving centres enabling service
users to voice activate alert alarms.
Identifying options for the removal of non-
residential care charges 
• The charging policy in respect of non-
residential care services is amended to
reflect the thresholds recommended by
COSLA 
Annual reporting to Social Work Resources
Committee
Deliver the National Care Service legislation,
subject to the agreement of Parliament
• Contribute to the consultation and
engagement process as required 
Progress and associated risks will continue to
be monitored by the Resource and reported to
the appropriate committees. 
Prioritising prevention and tackling health inequalities.
Reduce deaths and the level of harm caused by alcohol and drug deaths by delivering the National Mission, including: 
• Widening access to Residential Rehabilitation, increasing capacity by 50% to 650 beds, with 1000 people to access public funding for their
rehab placement every year by 2026. 
• Support families affected by drug and alcohol use – including early intervention for young people at risk, reducing stigma, integrating mental
health support, and funding specialist residential rehabilitation services for families and perinatal women.
• Ensure that people who are in crisis or distress can connect with services that meet their needs, strengthening collaboration between Police
Scotland, Mental Health Services, and other partners to better manage demand.
• Work with COSLA and Health & Social Care Partnerships to increase access to the care and support people living with dementia receive
following a diagnosis. This includes an expansion of community-based approaches, reducing demand for more intensive health and social
care support and enabling a greater proportion of the 90,000 people in Scotland with dementia to live well for longer, in a setting of their
choice.
• Test our approach to Bairns’ Hoose across ten areas – providing safe, trauma-informed environments for child victims and witnesses to
access multi-agency support and recovery services – ahead of a national rollout, incrementally, from 2027. 
• Continue work to Keep the Promise by consulting on the next stages of reform of the children’s hearing system, future of foster care, and the
support available to those moving on from care.
184

Page 185

• Through regulations which came into force in August, end the detention of under 18s in young offenders’ institutions. Under 18s will now be
detained in alternative settings, such as secure accommodation. Those under 18s who were detained in a young offenders’ institution before
28 August have now safely transitioned to new settings.
Focus Actions Timeline and reporting
Providing a whole system response to people
adversely affected by substance use
• Continue collaborative working across
the South Lanarkshire Alcohol and Drug
Partnership (ADP) in relation to
maximising the capacity capable of
supporting people adversely affected by
substance use.  
• In response to the rise in drug related
deaths across Scotland, implement the
urgent response delivery model that
has been introduced to embed
Medication Assisted Treatment (MAT)
across South Lanarkshire. This will
include trauma training for staff and the
commissioning of an advocacy service. 
Progress in relation to the standards will be
reviewed by Public Health Scotland in April
2024.  Regular reporting to Social Work
Resources Committee and IJB
Provide access to Bairns’ House by 2025 for
all children who are victims or witnesses to
abuse or violence (from 2023)
• Develop a Lanarkshire Implementation
and Strategic Group that will oversee
progress on the development of Bairns’
Hoose which remains on target for
implementation by 2025.
• Scoping of local supports and services
and consultation with children, their
families, and communities. 
2024/25 and ongoing progress updates to the
Social Work Resources Committee
Children and Young People’s Community
Mental Health and Wellbeing Support
• Development worker from VASLan to
support with third sector and
engagement with families
• Create a Mental Health and Wellbeing
website
A development worker has been identified to
help support with third sector and engage with
families 
Website launched Wellbeing SouthLan
185

Page 186

Delivering the work of The Promise • The Promise engagement team will
continue to use a variety of methods to
support care experienced children and
young people to have their views heard
including regular weekly groups, links
with children’s houses and an annual
Care Day event. 
• Continued attendance of Champions
Board representatives at strategic
forums such as The Promise Board,
community planning groups, corporate
parenting events and budget
allocations. 
Ongoing and progress updates to the Social
Work Resources Committee
National Dementia Delivery Plan 2024 – 2026
sets out how local authorities will implement
the commitments contained within Scotland’s
national dementia strategy
• Pan Lanarkshire partners are
considering the National Dementia
Delivery Plan, with reference,
specifically, to the nationally agreed
funded deliverables or themes to be
addressed, within the first two years of
implementation. In doing so, work has
started on considering the current
position, and the need for further
scoping to be undertaken. 
Ongoing – progress report to Senior
Management Team 